Sarawak · 1 December 2025

19th Assembly, 4th session, 3rd meeting (unedited) · not final · 32 turns · 31,015 words · official PDF ↗

16 of 32 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSarawak publishes only unedited transcripts (Belum Disunting). The 19th Assembly was dissolved on 26 Oct 2026. Speakers are matched by our parser and will have some errors.

(Opening)

Mr SpeakerEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Good morning and greetings of peace. Honourable Members. I have granted leave of absence under Standing Order 81 to Yang Berhormat Datuk Amar Haji Awang Tengah bin Ali Hasan, Honourable Deputy Premier and Member for N.82 Bukit Sari; Yang Berhormat Datuk Haji Ibrahim bin Haji Baki, Deputy Minister for Utility and Member for N.8 Satok for today's sitting until 3rd December 2025; Yang Berhormat Dato Sri Tiong King Sing, Honourable Member for N.52 Dudong for today's sitting; and Yang Berhormat Dato' Sri Huang Tiong Sii, Honourable Member for N.45 Repok, for today and tomorrow's sitting.

CONTINUATION OF DEBATE ON THE SECOND READING OF THE RANG UNDANG-UNDANG PERBEKALAN (2026), 2025 AND MOTION TO REFER THE RESOLUTION ON DEVELOPMENT EXPENDITURE ESTIMATES FOR THE YEAR 2026

[Winding-up by the Ministers]

Mr Speaker

Ahli-ahli Yang Berhormat, with the leave of absence that have granted to Yang Berhormat Datuk Amar Haji Awang Tengah bin Ali Hasan, Deputy Premier; Second Minister for Natural Resources and Urban Development; and Minister for Industrial Trade, Industry and Investment, the winding up speeches for his ministries shall be delivered by the deputy ministers of their respective Ministries.

Dengan hormatnya saya menjemput Yang Berhormat Datuk Dr. Malcolm Mussen anak Lamoh, Timbalan Menteri Perdagangan Antarabangsa, Industri dan Pelaburan untuk menyampaikan ucapan penggulungan.

Datuk Dr. Malcolm Mussen anak LamohPRS · GPSDeputy Minister of International Trade, Industry and Investment · Batang Ai

(Inaudible)…to deliver this winding up speech on behalf of my ministry, MINTRED in this august House. Tuan Speaker…(Interruption)…

Mr Speaker

Yang Berhormat, because of the earlier interruptions, can you start again?

Datuk Dr. Malcolm Mussen anak LamohPRS · GPSDeputy Minister of International Trade, Industry and Investment · Batang Ai

Okay, thank you. Then give me more time. Thank you, Tuan Speaker, it is indeed a great honour to be given this golden opportunity to deliver the winding up on behalf of my ministry, MINTRED in this august House.

Tuan Speaker, first and foremost, allow me to extend my sincere congratulation to Yang Amat Berhormat Premier of Sarawak for being awarded the prestigious “Order of the Rising Sun, Gold and Silver Star” by the government of Japan. This honour reflects his exceptional leadership and significant contribution to strengthening Sarawak and Japan relation over the years. “Nihongo Sir, anata no shigoto wa subarashii desu ne” (Japanese words) which mean he has done a good job, amazing job indeed.

Subsequently, I would like to congratulate Yang Amat Berhormat Premier for tabling this people-centric 2026 Sarawak Budget, with the theme of “Empowering People, Advancing Prosperity, Building a Resilient Future”, which would enable every Sarawakian to participate meaningfully in the progress of our beloved State. At the ministry level, more emphasis to place on strengthening investment and trade promotions, developing more industrial infrastructure and assisting more small and medium enterprise development. These measures are essential to solidify Sarawak as a competitive investment and trade hub, as well as enable more local industries to integrate effectively into the global supply chains.

Investment and Industry

Tuan Speaker, aligned with the Post COVID-19 Development Strategy (PCDS) 2030, my ministry has intensified efforts to strengthen the industrial sector through effective policies, targeted incentives and strategic collaborations with stakeholders. These initiatives are supported by appropriate infrastructure development and continuous improvement to the business environment.

Sarawak Gross Domestic Product (GDP) showed continued growth from RM131.6 billion in 2021 to RM148.2 billion in 2024. Manufacturing, being the largest sector, experienced fluctuating growths, peaking in 2022 at RM39.2 billion before moderating and recovering slightly to RM38.2 billion in 2024. Despite the challenging environment, Sarawak attracted a total investment of RM105.9 billion for period of 2021 to the third quarter of 2025. This amount consisted of RM68.4 billion (64.5%) in domestic investment and RM37.5 billion (35.5%) in foreign investment.

The approved investment was recorded in three sectors, namely RM47.3 billion in the primary sector, RM31.3 billion in the manufacturing sector and RM27.3 billion in the services sector. This investment created more than 25,000 potential employment opportunities with over 21,000 created in the manufacturing sector alone. During this period, investments in manufacturing were primarily in the Electrical and Electronic or (E&E) and chemical industry.

Tuan Speaker, Sarawak industrial landscape is advancing through mutual reinforcement. Growth in the E&E and semiconductor sectors are driving advanced manufacturing capabilities, while energy intensive industries, oil and gas, petrochemical and shipbuilding continue to expand, leveraging on reliable renewable energy and modern infrastructure. These developments are increasingly integrated with the state low-carbon agenda, including hydrogen, Carbon Capture, Utilisation and Storage (CCUS); and other clean energy technologies, creating a cohesive industrial ecosystem that inculcate resilience, enhances competitiveness, and supports Sarawak’s long-term vision for a dynamic and sustainable economy under PCDS 2030.

Electrical and Electronic

Sarawak growing role as a competitive hub for high value E&E manufacturing has successfully attracted Multinational Corporations (MNCs) from Japan, South Korea, China, Belgium and Germany to establish operation at Sama Jaya Free Industrial Zone. During the 2021 to 2024 period, the economic spin-offs generated by these MNCs were RM35 billion in exports, RM4 billion to the local economy (utilities and services) and RM3 billion in salaries. From 2021, Sarawak has approved more than RM13 billion worth of investment for expansion in the E&E sector, despite global economic challenges.

Sarawak strategic policies across investment promotion, infrastructure development, and talent enhancement have successfully cultivated a robust E&E ecosystem. This ecosystem now supports advanced manufacturing capabilities, promotes technology transfer, and encourages collaboration between industry, research institutions, and training providers. Sarawak E&E cluster has become instrumental in incubating strategic emerging sectors, particularly the semiconductor industry.

Semiconductor

Sarawak is rapidly emerging as a regional hub for wafer fabrication, IC testing, high-precision electronics and advanced packaging. Anchored by SMD Semiconductor, the state’s Semiconductor Roadmap 2030: Beyond Moore’s Law charts a clear long-term direction. This includes the development of Sarawak-owned chips such as the Keteq.ai power converter and Keteq.GaN next-generation device. SMD is also establishing the Sarawak Integrated Silicon Longhouse with an AI Chip Integration Centre in Sama Jaya Free Industrial Zone, supported by partners like UK’s CSA Catapult, Belgium’s X-FAB, and South Korea’s Rebellions Incorporated. These advancements, reinforced by recent international recognition in London, consolidate Sarawak’s position as a competitive and innovation driven semiconductor hub.

With continued expansion of R&D capacity, industry academia collaborations and technical training, Sarawak is primed to become a leading semiconductor hub in Southeast Asia, generating high-skilled jobs and driving long-term technological competitiveness. Forging ahead, Sarawak is strengthening its ecosystem to complete an integrated semiconductor supply chain, advancing AI hardware development and cultivating specialised semiconductor talent.

Energy Intensive Industries

The Sarawak Corridor of Renewable Energy (SCORE) strategy has been instrumental in unlocking Sarawak’s stable, cost-effective and environmentally responsible renewable energy through large-scale hydropower assets and a reliable grid system. This has attracted strategic upstream industries such as polycrystalline silicon, aluminium, and ferroalloys. As these upstream industries mature, the MNCs are now moving towards higher-value downstream activities including deeper integration into the solar and semiconductor value chains and downstream processing such as specialised alloys and value-added metallurgical applications. For the polycrystalline silicon industry, private investment worth RM1.9 billion has been approved this year for diversification into semiconductor grade polysilicon. Just to illustrate the gravity of quality issue involving the semiconductor. This electronic grade silicon, we call it EGS must have a purity of 99.99999% or we call nine anteriority where only one impurity item is allowed for every billions of silicon item. So, how stringent the quality control in this business, ya.

This transition from upstream and downstream activities represents a natural and strategic progression toward a more diversified and competitive industrial base. Going forward, Sarawak’s efforts will be concentrated on accelerating future downstream development to unlock greater economic value from locally produced materials, reduce export of raw intermediates, and stimulate new growth opportunities for local SMEs.

Oil and Gas

Sarawak’s oil and gas sector has undergone a period of notable expansion, underpinned by Sarawak’s increasing authority over its petroleum resources and strengthened regulatory and commercial roles. Sarawak Government through PETROS now holds participation in 21 Production Sharing Contracts across offshore and onshore areas, marking a major step forward in asserting Sarawak’s rightful role in resource management. Projects under the Sarawak Gas Roadmap are currently progressing according to plan, with several key initiatives moving into advanced stages of implementation.

The continued upstream investment by PETROS, PETRONAS, Shell and other operators in onshore and offshore exploration and development activities reinforce the state’s strategy to ensure energy security, expand domestic production, and capture greater value for its people.

Petrochemical

Sarawak’s downstream petrochemical industry has also benefited from the vibrant upstream and midstream development in the oil and gas sector. The RM7 billion Sarawak Methanol Complex has already exported over approximately 750,000 metric tonnes of methanol to major markets including China, Japan, South Korea, Vietnam, Indonesia and India. This marks Sarawak’s successful entry into the global methanol value chain through our competitiveness in downstream petrochemicals. Building on this momentum, Sarawak Petchem is processing into new downstream ventures such as the Green Methanol Project, supporting Sarawak’s ambition to establish a Green Energy Bunkering Hub utilizing Low-Carbon/ Green e-Methanol as the fuel in Bintulu. In addition, the Low-Carbon Ammonia and Urea Project in collaboration with PETRONAS, will further diversify the state’s petrochemical portfolio and create new high-value opportunities.

Low-Carbon Economy

Tuan Speaker, Sarawak recognises that transition to a carbon-neutral manufacturing sector is crucial for economic growth and long-term resilience. This effort is intended to establish Sarawak as a green investment hub, unlocking new industries and creating high-value employment.

PETROS and anchor partners are currently conducting the Kuching Low-Carbon Hub (KLCH) master plan, guided by industry-led and demand-driven approach. This ensures alignment with real market needs while integrating energy development with broader urban planning to support diversification, sustainability and long-term industrial resilience. Through this coordinated effort, KLCH is poised to become a dynamic, well-connected hub that attracts new investments and reinforces Sarawak’s overall development trajectory.

The state’s Net Zero Strategy and Carbon Plan aim for a 35% reduction in emissions by 2050. This target will be achieved through core measures like electrification process optimisation and material utilization efficiency. It will be supported by investments in renewable energy, hydrogen and CCUS technologies, alongside incentives to encourage private-sector participation.

Sarawak Energy is accelerating the development of floating solar projects in its hydro reservoirs and has signed two MoUs with investors from China and the Middle East. At the same time, many proposals have been received for the development of ground mounted solar from Independent Power Producers (IPPs) with four power Purchase Agreement already signed with Sarawak Energy Berhad. SEDC Energy is leading major international hydrogen initiatives, green mobility and advanced manufacturing. Meanwhile, PETROS is also advancing Sarawak low-carbon leadership by pioneering CCUS development.

Shipbuilding and Ship Repair

The expansion of oil and gas sector has also promoted the growth across related industries, particularly the shipbuilding and ship repair (SBSR) sector for vessel construction, maintenance, and refurbishment services. At this juncture, around 60 of the 100 shipyards in Malaysia are located in Sarawak, making it the shipbuilding hub of Malaysia. These shipyards have expanded their capabilities to cater for the domestic oil and gas sector as well as international commercial and leisure activities.

Their global exports to Australia, Indonesia, Singapore, Middle East, Europe among others, have increased from RM345 million in 2021 to RM873 million in 2025. Sarawak’s SBSR industry is now well positioned to move into higher-value segments, including LNG-powered vessels, hybrid propulsion systems, and advanced maritime engineering solutions, backed by strong synergy between energy development and maritime capabilities.

Tuan Speaker, investment remains an integral part towards realising our goal of becoming a high-income economy. In this regard, InvestSarawak started operations in 2023 and has been tasked to attract high-impact investments across Sarawak priority sectors. Among them are renewable energy, solar, glass, unmanned aerial vehicle and chemicals manufacturing investments. With such unwavering focus, InvestSarawak continue to facilitate the implementation of various strategic projects across the state, reflecting increasing investor confidence in Sarawak.

Sarawak Government is ensuring a conducive environment for business activities to grow and prosper. To support this initiative, my ministry is finalising the Sarawak Investment Policy Study and will conduct a comprehensive Impact Assessment Study on Industrial Park across Sarawak under the RMK-13.

Trade Performance

Tuan Speaker, Sarawak’s trade performance between 2021 and 2025 exhibited growth that fluctuates, primarily dictated by global commodity price cycles. Energy export, namely crude petroleum and natural gas (LNG), remained the dominant drivers of total export earning. Crude petroleum and condensates peaked in 2022 at RM25.1 billion, while natural gas also recorded a sharp increase in 2022 and 2023. Both commodities, however, moderated in subsequent years due to volatile global prices and shifting demand, resulting in year-on-year trade fluctuation.

Beyond our energy export, industrial commodities demonstrated stable contributions and increasing diversification. Ferroalloys and related iron/steel products consistently maintained multi-billion ringgit export values, highlighting the success of energy-intensive metallurgical industries. Furthermore, semiconductor devices and electronic component showed dynamic growth, rising significantly from RM2.96 billion in 2021 to RM5.71 billion in 2023, indicating a successful shift into higher-value manufacturing. Exports were dominated by machinery and transport equipment, supporting industrial and production sector.

Overall, Sarawak’s trade structure is steadily evolving from heavy reliance on primary commodities toward a mix that includes advanced manufacturing, driven by industrial clusters and ongoing investments in energy-intensive and technology-based industries. The Sarawak Trade and Tourism Offices in Singapore and in Brunei Darussalam will lead efforts to coordinate trade collaboration in this region.

Entrepreneur Development

Tuan Speaker, Micro, Small and Medium Enterprises (MSMEs) continues to dominate Malaysia business landscape representing 96.1% of total business establishment in 2024. The sector recorded a growth from 4.9% in 2023 to 5.8 % in 2024. MSMEs contributed significantly to the economy, accounting for 39.5 % of our GDP and created 48.7% of total employment. A similar positive trend is observed in the export performance, increasing from 12.0% in 2023 to 14.3% in 2024.

Sarawak recorded 68,313 registered MSMEs, making up 6.3% of all business entities in Malaysia. Out of this, 75% are categorised as micro-enterprises, 22.7% as small businesses and 2.3% as medium companies. Majority of MSMEs are in the services sector and small share in construction, manufacturing, agriculture as well as mining and quarrying sector. MSMEs plays an important role in creating job and propelling Sarawak’s economy.

To ensure comprehensive and inclusive MSMEs development, the Federal Government emphasises a strategic focus on the following areas:

(a) Transition into higher value chains; (b) Digitalising trade processes; (c) Embedding ESG-driven business practices; (d) Expanding into alternative market; and (e) Upgrading the local supply chain.

Aligned with the Federal Government’s strategies focus, Sarawak Government will continue to implement key initiatives including capacity building, market access facilitation, financial assistance and the provision of conducive business infrastructure to support the growth of our local MSMEs. These efforts aim to ensure local MSMEs remain competitive and are well-positioned to tap into opportunities in the global market place.

Capacity Building

Tuan Speaker, Sarawak Government remains committed to enhance the capacity of entrepreneurs through various training and skills development programmes. These include courses in basic accounting and book-keeping, business management, product packaging, certification, food handling, marketing and promotion as well as digital skills.

From 2021 to the third quarter of 2025, my ministry together with agencies such as TEKUN, IKMA, INSKEN, MARA, Department of Agriculture Sarawak, Jabatan Wanita dan Keluarga Sarawak; SEDC and TEGAS, among others, have conducted a total of 1,824 capacity building programmes benefiting over 100,000 entrepreneurs in Sarawak. Through these programmes, entrepreneurs are equipped with essential knowledge, skills including exposure to digital entrepreneurship which enable them to sustain their competitiveness amid market shifts.

The Sarawak Digital Mall continue to provide an inclusive digital ecosystem that empowers youth, women and rural entrepreneurs to participate more actively in digital economy. Within a year, Sarawak Digital Mall have recorded total sales of RM12.9 million. Therefore, my ministry together with SDEC will expand the outreach of more than local MSMEs to onboard digital entrepreneurship and broaden their market access globally.

For MSMEs intending to diversify and scale up, it is paramount for them to progress from domestic to international markets. In pursuit of this goal, my ministry has provided extensive market access opportunities through various domestic and international exposition and showcases. More than 9,000 MSMEs have participated in these programmes, achieving sale exceeding RM350 million. Sarawak SBSR entrepreneurs recorded potential contract worth RM800 billion at the Asia Pacific Maritime Singapore 2024 while at the World Expo Osaka 2025, Sarawak entrepreneurs secured RM207 million worth of contract with their Japanese counterparts.

Financial Assistance

Tuan Speaker, access to business assistance is very essential for entrepreneurs to kick-start and expand their businesses. The State Government through my ministry offers comprehensive financial support for MSMEs through programmes like GERAK, USTEV, Go Digital, SKMS and SPIKS. From 2021 to the third quarter of 2025, these programmes have benefitted more than 10,200 MSMEs with total approvals of fund amounting to RM220.3 million.

In addition, the Federal and State Government agencies such as AIM, Bank Rakyat, MARA, SME Corp. Malaysia, Jabatan Wanita dan Keluarga Sarawak, Department of Agriculture Sarawak, SEDC and TEGAS also provided various forms of financial assistance to MSMEs. As of now, over 358,000 MSMEs have been assisted with accumulative approval totalling RM2.8 billion. Through this support, local MSMEs have gained the financial capacity to enhance cash flow management and sustain their business operations.

My ministry has also collaborated with relevant agencies to support informal sector to regularise their businesses through the Jum Regista Bisnes programme. By formalising their businesses, entrepreneurs can benefit from various entrepreneurship support provided by the government and financial institutions as well as opportunity to explore other business prospects.

To date, a total of 5,791 entrepreneur has been assisted through the Jum Regista Bisnes programme. Out of this number, 60% have become eligible to receive various forms of business support, secure government and private-sector contract and expanded their markets beyond Sarawak. This initiative has contributed significantly to improving the socio-economic well-being of entrepreneurs, particularly those in rural Sarawak.

Industrial Infrastructure and Business Facility Development

Tuan Speaker, my ministry has placed strong emphasis on accelerating the development of industrial facilities and supporting ecosystem to realise the goals of PCDS 2030. Under RMK-12, we have successfully completed six industrial park projects covering an area of 119 acres with a total cost of RM132.1 million in Kuching, Sri Aman, Betong, Bintulu, and Miri. Furthermore, two Anjung Usahawan in Kuching division were constructed with a total cost of RM19.2 million. With increasing demand for business facilities, the completed development will provide more ready to occupy industrial sites and dedicated facilities for industries to grow and support our local SMEs.

Building upon this momentum, the ministry has already commenced the next phase of expansion. We are now constructing five additional industrial parks in the key growth centres of Kuching, Sibu, and Bintulu, encompassing a total development area of 417 acres. These five new industrial parks and four new Anjung Usahawan project will be implemented through an approved ceiling of RM139.1 million.

Looking ahead to RMK-13, my ministry has been allocated with a total ceiling of RM403.25 million for the development of 15 industrial parks and 15 Anjung Usahawan project. A key strategic objective of these initiatives is to extend essential businesses. Sorry, to extend essential business and manufacturing infrastructure into small town and rural areas. All these vital projects are currently progressing through various stages of implementation, including land identification, site application, land acquisition, design and tender preparation.

In addition, other developments that support PCDS 2030 are also progressing well. The Sarawak Bio-industrial Park in Kota Samarahan is a strategic initiative focused on cultivating a high-value, biotechnology-based industrial ecosystem namely bioactive, bio-health, biomaterials, bioenergy, and bioenvironment, to provide SMEs and emerging bio-based companies with access to shared R&D facilities and commercialisation pathways. Meanwhile, Kota Petra Green Technology Park in Kuching is a private initiative that integrates clean energy, advanced manufacturing, and digital infrastructure. These projects are expected to attract over RM14 billion in private investments and create thousands of high-skilled employment opportunity.

Nonetheless, my ministry would like to acknowledge Kementerian Pembangunan Usahawan dan Koperasi for its Program Pembangunan Premis (Tamu Desa). Under this programme, the upgrading of 39 Tamu Desa across Sarawak has been fully completed with the total cost of about RM8 million. This initiative will be continued under the RMK-13 and my ministry together with the Ministry of Public Health, Housing and Local Government Sarawak will is currently identifying a list of new Tamu Desa project for implementation in 2026.

Tuan Speaker, I would like to thank Ahli-ahli Yang Berhormat for Kalaka, Opar, Padungan, Kabong, Beting Maro and Tanjong Batu for their comment suggestions on matters related to investment, SME development and industrial infrastructure. My ministry will address these matters with the relevant authorities. Fittingly, my ministry would like to express sincere appreciation to federal and state agencies, as well as the private sector for their close cooperation, collaboration over the years. All the above initiatives are implemented to grow and strengthen the industrial and SMEs sectors in Sarawak. My ministry is committed to our strategic goal of achieving economic prosperity, social inclusivity, and environmental sustainability. Let us continue the good work as we accelerate the momentum of growth towards realising the aspiration of PCDS 2030.

Penutup

Tuan Speaker, as prelude to my closing remark, allow me to share this beautiful quote from American coach, Law Ho, “ability is what you are capable of doing, motivation determine what you do, attitude determine how well you do it”. Tuan Speaker, Sir, you have got all these positive attribute to deserve your re-appointment as the most exemplary Speaker of this august House (Applause). Congratulations Sir, ya, congratulations to you and may God bless you in your endeavour. Sebelum mengakhiri ucapan penggulungan ini, saya ingin merakamkan penghargaan kepada Tuan Speaker atas ketegasan dan kepimpinan dalam mengendalikan Persidangan DUN dengan baik dan lancar. Saya juga ingin mengucapkan terima kasih kepada semua pegawai yang terlibat dalam menjayakan persidangan ini. Akhir sekali, saya ingin mengambil kesempatan untuk mengucapkan Selamat Hari Krismas, Selamat Tahun Baharu 2026, Selamat Tahun Baru Cina kepada Ahli Yang Berhormat dan seluruh rakyat Sarawak.

Mentari timur menyinari pagi, Bersinar indah di Bumi Kenyalang; The Order of the Rising Sun, Gold and Silver Star anugerah tertinggi, Premier Sarawak terhormat, pemimpin terbilang.

RMK-12 berjaya dilaksana, Semangat Sarawak First tersemat di hati; RMK-13 agenda seterusnya, Demi kemakmuran Ibu Pertiwi.

Sekian, terima kasih, arigato gozaimasu, merci beaucoup, muchas gracias, obrigado, thank you. (Applause)

Mr SpeakerEN

With respect, I invite the Honourable Member Datuk Haji Len Talif Salleh, Deputy Minister of Urban Planning, Land Administration and Environment, to deliver the winding-up speech.

Datuk Haji Len Talif SallehPBB · GPSDeputy Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

Thank you, Mr Speaker. Bismillahirrahmanirrahim. Assalamualaikum Warahmatullahi Wabarakatuh, greetings of peace, Salam Sarawak Maju Makmur and Salam Segulai Sejalai.

Introduction

Mr Speaker, first of all, I would like to inform this august House that the Member of the State Legislative Assembly (DUN) for N.82 Bukit Sari, the Honourable Datuk Amar Awang Tengah bin Ali Hasan, Second Minister of Natural Resources and Urban Development, is unable to attend this sitting of the State Legislative Assembly, and I have been entrusted to deliver the winding-up speech for the Ministry of Natural Resources and Urban Development.

Mr Speaker, I would like to extend my congratulations to the Honourable Tan Sri Datuk Amar Speaker on his re-appointment as Speaker of the State Legislative Assembly for his 10th term. It is an achievement and accomplishment without equal or comparison in Malaysia or in this region.

I also extend my congratulations to the Honourable Premier of Sarawak, Datuk Patinggi Tan Sri (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, who received the "Order of the Rising Sun, Gold and Silver Star" from Emperor Naruhito at the Imperial Palace in Tokyo on 11 November 2025, in recognition of his contribution in strengthening bilateral cooperation and championing the agenda of environmental sustainability, including the green economy. This prestigious award is a great honour for all the people and the Government of Sarawak.

I also extend my warmest congratulations and well done to the Honourable Premier of Sarawak for successfully tabling the 2026 Budget, themed "Empowering People, Advancing Prosperity and Building a Resilient Future", which focuses on fiscal stability, economic strengthening and growth, prudent financial management and the well-being of the people, to ensure that prosperity is shared by all the people of Sarawak.

On this occasion, I also extend my heartfelt thanks to all the Honourable Members who took part in the debate and provided insightful views on matters under the purview of the Ministry of Natural Resources and Urban Development.

I have noted the matters raised by the Honourable Members for Tanjong Datu, Pending, Kota Sentosa, Stakan, Beting Maro, Kabong, Meluan, Ngemah, Bukit Assek, Bawang Assan, Tellian, Tamin, Katibas, Baleh, Murum, Telang Usan and Ba'Kelalan. Follow-up action will be taken by this ministry and the departments and agencies under the relevant ministry.

Mr Speaker,

New Initiative NCR Land Survey Programme

For the information of this august House, the Government of Sarawak consistently recognises and upholds the rights of the people over their valid NCR land, which has been created in accordance with the provisions of the existing land laws.

Under the New Initiative NCR Land Survey Programme, which has been carried out since October 2010 until 31 October 2025, an area of approximately 1,223,646 hectares has been successfully surveyed by perimeter. Of this total, an area of approximately 947,442 hectares has already been gazetted as Bumiputera Communal Reserve (Agriculture) under Section 6 of the Sarawak Land Code. These survey works are based on applications from the parties concerned.

Since 2017, the survey has also focused on individual lots for the issuance of land titles under Section 18 for areas that have been gazetted, based on applications and the readiness of claimants. Up until 31 October 2025, a total of 107,467 individual lots have been successfully surveyed, covering an area of 127,016 hectares that has been or will be issued land titles under Section 18 of the Sarawak Land Code.

To expedite the survey of individual NCR land lots, land claimants are required to be present during the field survey, to clearly mark their land boundaries and to avoid disputes in making claims, so that the survey can proceed more smoothly.

The Government of Sarawak is committed to ensuring the continuity of this programme and will continue to provide the necessary funds, in addition to the funds received from the Federal Government.

Resettlement Scheme (SPS) and Village Expansion Scheme (SPK)

Mr Speaker, for the information of this august House, the implementation of the Resettlement Scheme (SPS) and the Village Expansion Scheme (SPK) since the Fourth Malaysia Plan (RMK-4) is a commitment and concern of the Government of Sarawak towards low-income people who need land to build homes.

Since 2018, the Honourable Premier of Sarawak has improved this policy by introducing new infrastructure specifications, involving paved roads, concrete drains, walled lots, and a reticulation system for water and electricity supply in SPS and SPK, at an average cost of RM150,000 per lot. Out of concern by the Government of Sarawak, the land premium payment for each lot is fixed at not exceeding RM2,500, and payment may be made in annual instalments for up to 10 years.

Under the allocation for the Twelfth Malaysia Plan (RMK-12) and the people's project allocation, up until 31 October 2025, a total of 84 SPS and SPK projects have been approved, which will provide 8,564 residential lots, with the implementation cost estimated at RM1.581 billion. Of the 84 projects, 28 projects have been fully completed according to the development scope, and the remaining 54 projects will continue until the end of RMK-12 and into the Thirteenth Malaysia Plan (RMK-13). Meanwhile, two projects faced objections on the ground and could not be implemented. SPS and SPK will continue to be strengthened in RMK-13 to provide facilities to the people who need residential homes, in line with the inclusive aspirations of the GPS Government of Sarawak.

New Township, Service Centre and Affordable Housing

Mr Speaker, the Government of Sarawak, through the Land Custody and Development Authority (LCDA), continues to give priority to new township development, new towns and service centres in rural areas, with an allocation of RM243.89 million in RMK-12, and these efforts will continue to be implemented in RMK-13.

LCDA also implements affordable housing development under SPK, Rural Growth Centre (RGC) and Bandar Baru Sebuyau. A total of 1,253 affordable housing units have been approved and are currently at various stages of planning and implementation. The construction of these houses will continue to be implemented in RMK-13.

Establishment of the Green Mining and Quarrying Academy: Towards Green Mining and Quarrying in Sarawak

Mr Speaker, to meet the specific expertise and skills required in the mining and quarrying industry, the Government of Sarawak has approved the establishment of the Green Mining and Quarrying Academy during the launch of the new campus of the Centre for Technology Excellence Sarawak (CENTEXS) in Lawas on 25 August 2025. The academy's role is to produce manpower, a learning centre, as well as research and development (R&D) towards the sustainability of the mineral industry.

In addition, the Ministry and CENTEXS have signed a Statement of Cooperation (SOC) with the University of British Columbia (UBC), Canada, on 6 November 2025 as a training partnership. This effort is important to produce skilled and highly knowledgeable manpower so that the mining and quarrying industry in Sarawak can be developed according to global best practices. Following this, Sarawak's children are encouraged to join the training in this field that will be offered by this academy in future.

Sarawak's Forest Heritage, Our Heritage

Mr Speaker, the Government of Sarawak continues to emphasise its commitment to protecting forests as a heritage for present and future generations, by maintaining forest cover at more than 62% of Sarawak's land area. This effort is intensified through the expansion of protected areas, forest landscape restoration programmes, and programmes oriented towards the green economy.

Various approaches have been taken to strengthen the environmental conservation framework in Sarawak, including the use of the latest technology through strategic collaboration with local and international agencies such as the United States of America, Australia, China, Finland, Indonesia, Japan, Singapore and the United Arab Emirates.

Forest Rehabilitation and Forest Plantations

Mr Speaker, the Malaysia Greening Programme: 100 Million Trees Planting Campaign across the country from 2021 to 2025 has been set at the national level, in which Sarawak has recorded the highest achievement in Malaysia. As of 31 October 2025, a total of 55 million trees have been planted, exceeding the original target of 35 million trees set for the Government of Sarawak.

In conjunction with the International Conference on Forest Plantation Research and Innovation 2025, held from 17 to 19 November 2025 in Kuching, experts from 11 countries, namely South Africa, the United States of America, Australia, China, Finland, Indonesia, Japan, Malaysia, New Zealand, France and Vietnam, shared experiences and expertise on research, innovation and sustainable forest plantation management. This conference is an important platform in efforts to expand best practices and to open opportunities for green economy investment, particularly in the forest plantation industry.

Sabal National Park and Sabal Forest Reserve as an Eco-Tourism Hub

Mr Speaker, the Honourable Premier of Sarawak, on 18 October 2025, launched the latest eco-tourism hub area covering Sabal National Park and Sabal Forest Reserve, which includes the Sustainable Forest Management Area Model (Forest Management Area Model) and the bamboo garden (Bambusetum), jointly managed by the Sarawak Forestry Corporation (SFC), the Sarawak Forest Department, Sarawak Timber, and the Sarawak Timber Industry Development Corporation (PUSAKA).

The construction of the Sabal Complex, valued at RM65 million within the Sabal Forest Reserve, is scheduled to begin in 2026 under RMK-13. This project is a strategic initiative that integrates conservation efforts, sustainable forest management, and conservation-based eco-tourism development. The components of this project include the provision of basic facilities, accommodation, research and training facilities, the development of recreational forests, as well as modern and environmentally friendly tourism infrastructure.

Sarawak Delta Geopark (SDGp)

Mr Speaker, the UNESCO Global Geopark Council, at its 10th meeting held from 5 to 6 September 2025 at the Kütralkura UNESCO Global Geopark, Chile, gave a Green Card (accepted) status to the nomination of the Sarawak Delta Geopark as a UNESCO Global Geopark. This decision will be brought to the UNESCO Executive Board, scheduled for May 2026, next year, for the endorsement process for official recognition as a UNESCO Global Geopark (UGGp).

Forest Enforcement, Totally Protected Areas (TPA) and Wildlife

Mr Speaker, the Government of Sarawak is always committed to ensuring that illegal logging is eradicated down to its roots. For the period May to October 2025, the Sarawak Forest Department has opened a total of 81 investigation papers for cases of offences related to forests. A total of four cases have been registered for prosecution in court, of which two cases have been completed in trial, while two cases are still in the process of prosecution and trial. The rest are still at various stages of investigation. A total of RM554,923 in compounds and RM718,551 in disposal proceeds through the sale of confiscated timber were collected during the period.

Meanwhile, enforcement activities to protect Totally Protected Areas (TPA) and wildlife are important in ensuring the sustainability of the natural environment. Therefore, the Sarawak Forestry Corporation (SFC) will always carry out patrol and enforcement activities continuously, by detecting, preventing and taking action against any encroachment, illegal hunting and other activities that contravene the law.

For the period April to November 2025, SFC has opened a total of 59 investigation papers for offences related to TPA and wildlife crimes, in which nine cases have been brought to court for prosecution, 15 cases have been compounded, two land cases have been sent to the Sarawak Attorney General's Chambers, and the remaining 33 cases are still at various stages of investigation.

At the same time, a total of eight investigation cases opened in the previous year were also prosecuted in court, bringing the total number of cases brought to court during this period to 17 cases. Of this total, 21 accused persons pleaded guilty and were fined by the court, while 13 offenders were sentenced to imprisonment.

For the period April to November 2025, a total of RM39,000 in compounds was collected, while the total court fines imposed on offenders amounted to RM216,700. Recently, from 4 to 8 November 2025, SFC and the Royal Malaysia Police (PDRM) established cooperation with Indonesian enforcement agencies in combating wildlife smuggling activities at the Malaysia-Indonesia border. Throughout the operation period, a total of 313 wildlife specimens were seized, such as ara wood (Ficus species), casuarina (Casuarina species) and staghorn fern (Platycerium species).

Meanwhile, at the national level, the Khazanah Integrated Operation (OBK), with the cooperation of PDRM and the Royal Malaysian Customs Department, for the period April to November this year, a total of 24 operations were carried out, with a seizure value of RM2,231,784.

Mr Speaker,

Recognition of Bako National Park and Bukit Lambir National Park as ASEAN Heritage Parks

Bako National Park and Bukit Lambir National Park have been recognised as new ASEAN Heritage Parks. The award ceremony will be held on 3 December 2025, the day after tomorrow, Wednesday, in Hanoi, Vietnam. This is another great achievement for Sarawak and our country, proving the capability of national park management that meets the best management standards in the region.

Mr Speaker,

Conservation and Management of Totally Protected Areas (TPA)

The Government always welcomes the involvement of researchers from within and outside the country to explore Sarawak's rich and unique biodiversity heritage. As of November 2025, a total of 105 scientific research permits involving 85 local researchers and 21 international researchers have been issued by the Wildlife Controller.

The Research for Intensified Management of Bio-Rich Areas (RIMBA) project under RMKe-12 focuses on the collection of data and information on iconic species, to publish Species Conservation Action Plans (SCAP) under the action plan of the International Union for Conservation of Nature (IUCN). The findings of these SCAPs will assist in producing the Totally Protected Area Management Plan in Sarawak, in formulating long-term and holistic strategies to conserve and protect flora and fauna species in a sustainable manner. So far, SFC has published the SCAP for Marine Turtle and the SCAP for Proboscis Monkey, while the SCAP for Orangutan is in the process of being printed.

Mr Speaker,

Performance of the Sarawak Timber Industry

The export value of the Sarawak timber industry up to the third quarter of 2025 recorded RM1.87 billion. Sawn timber contributed a value of RM310 million, an increase of 3% compared with RM301 million for the same period in 2024, while wood pellet exports also increased by 60%, with a value of RM97 million, likewise compared with RM60 million for the same period. Japan remains the main importer with a value of RM1.17 billion, followed by India – RM299 million, the Middle East countries – RM105 million, Taiwan – RM77 million and the Philippines – RM65 million.

In an effort to promote the use of engineered timber such as laminated veneer lumber, glulam and cross laminated timber in Sarawak, PUSAKA, in collaboration with Universiti Teknologi Sarawak (UTS) and Universiti Teknologi Mara (UiTM), organised the International Conference on Advanced Applied Science (ICAAS 2025) from 6 to 7 August 2025. The conference also witnessed the exchange of a Memorandum of Understanding (MOU) between PUSAKA and UTS to strengthen strategic cooperation in research and technological innovation related to engineered timber.

Mr Speaker,

Sustainable Environmental Management

Environmental Impact Assessment (EIA) is a legal requirement and an important instrument in ensuring sustainable development in Sarawak. Up to the third quarter of 2025, the Natural Resources and Environment Board (NREB) has received a total of 61 EIA reports and 15 Environmental Management Plans (EMP). Of this total, 46 EIA reports and 15 EMPs have been approved, while 15 EIA reports are still at various stages of evaluation.

To ensure that the terms and conditions of EIA approval are complied with, during the period January to October 2025, NREB has carried out a total of 918 post-EIA monitoring exercises and has received a total of 1,857 Environmental Monitoring Reports (EMR).

Monitoring results found 87 cases of non-compliance, and notices have been issued for those offences. During the same period, 14 investigation paper cases were opened, while eight cases were compounded with a value of RM150,000.

To strengthen the monitoring and compliance process, NREB is improving the Standard Operating Procedures (SOP) for Post-EIA Monitoring and Guidelines for EMR Submission and Evaluation. This step aims to standardise field inspections, strengthen reporting aspects, and ensure that enforcement actions are carried out consistently and systematically.

Mr Speaker,

Self-Regulation of Environment Through Environmental Compliance Audits

NREB mandates the full implementation of Environmental Compliance Audits (ECA) for the forestry sector in Sarawak. A total of 63 ECA Audits have been carried out up to October 2025. In addition, six series of ECA Auditor Certification Courses, involving 153 participants, have been held to enhance the competency of ECA auditors.

Mr Speaker,

Status of Air Quality in Sarawak

Overall, the Air Pollution Index (IPU) in Sarawak during the period January to October 2025 was within the 'Good' category (IPU 0-50) and the 'Moderate' category (IPU 51-100).

To expand the coverage of air quality monitoring stations and to enhance the level of comprehensive enforcement, NREB has added two more new stations in Kanowit and Belaga, in addition to the five existing stations, namely Lundu, Tebedu, Lubok Antu, Bario and Lawas. In addition, there are 12 air quality monitoring stations under the supervision of the Department of Environment, which are also operating in Kuching, Samarahan, Sri Aman, Sarikei, Sibu, Mukah, Kapit, Bintulu, Samalaju, Miri, ILP Miri and Limbang.

Mr Speaker,

Status of Transfer of Autonomy on Environment under the Malaysia Agreement 1963 (MA63)

At the meeting of the Malaysia Agreement 1963 (MA63) Implementation Action Council chaired by the Honourable Prime Minister on 12 September 2025 in Kuching, it was agreed that amendments to the Environmental Quality Act (EQA) 1974 to suspend its application in Sarawak would be tabled in Parliament before the transfer of powers to Sabah and Sarawak under Article 95C of the Federal Constitution could be implemented. This transfer of powers is intended to manage scheduled waste, which marks the first step towards the full transfer of environmental management functions to Sarawak.

Mr Speaker,

Environmental Education and Awareness

As of October 2025, NREB has organised a total of 56 environmental education programmes targeting communities, students and school teachers, non-governmental organisations (NGOs) and industry players, to raise awareness of environmental issues and to foster a sense of concern and responsibility in the conservation of the environment.

NREB aims to establish 1,459 Environmental Lovers Clubs (PALS) across all schools in Sarawak to strengthen environmental education. To date, a total of 681 PALS clubs have been established.

Mr Speaker,

Specific Issues

Next, allow me to touch on the specific matters raised by the Honourable Members during the debate in this august House.

For the information of the Honourable Member for Katibas, as of 31 October 2025, a total of 12 areas within the Katibas State Constituency covering 44,980 hectares have been fully surveyed, all of which have been gazetted as Bumiputera Communal Reserve (Agriculture) under Section 6 of the Sarawak Land Code. Three areas covering 11,238 hectares are currently in the process of survey, four areas covering 31,327 hectares will commence survey subject to the readiness of land claimants on the ground, and another two areas covering 4,515 hectares are facing objections on the ground.

As for the survey of individual lots, a total of four areas covering 16,276 hectares have been approved for survey. Of this total, two areas covering 8,611 hectares are currently in the process of survey, of which 1,290 hectares involving 484 lots have been fully surveyed. Another two areas covering 7,665 hectares will commence survey subject to the readiness of land claimants on the ground. A total of 449 land titles under Section 18 of the Sarawak Land Code have been issued for the areas that have been fully surveyed.

For the information of the Honourable Member for Tellian, as of 31 October 2025, under the New Initiative NCR Land Survey Programme, the NCR land for:

(a) Ulu Sikat area, Batang Mukah has been gazetted under Section 6 of the Sarawak Land Code through gazette Swk. LN. 163 dated 12 August 2022; and (b) Sungai Sebakong area, Mukah has been gazetted under Section 6 of the Sarawak Land Code through gazette Swk. LN. 2 dated 9 January 2025.

As for the Nanga Langan Baoh area, Dalat, its perimeter has been fully surveyed and it is currently in the process of gazetting.

For the information of the Honourable Members for Meluan and Tamin, the Government always ensures adequate allocation for the New Initiative NCR Land Survey Programme. The Government of Sarawak has indeed increased the allocation and the number of survey teams, consisting of 467 officers of various categories, to increase the existing capacity of the Lands and Surveys Department.

For the information of the Honourable Member for Murum, survey work on agricultural lots in the Tegulang Resettlement Scheme, Murum HEP, still cannot proceed due to objections on the ground from local residents of Long Magan and Long Lawen, despite several rounds of dialogue that have been held. Therefore, continued cooperation from local leaders, including the Resident's Office and District Office, to intensify engagement sessions is greatly needed to ensure that this survey work can proceed until completion.

For the information of the Honourable Member for Katibas, development for affordable housing may be proposed at the Village Expansion Scheme (SPK) Song Fasa II and the Resettlement Scheme (SPS) Jalan Takan Phase II, Song, which have 47 lots and 13 lots respectively that have not yet been allocated. However, upgrading of existing infrastructure must be implemented together with the proposed affordable housing development.

For the information of the Honourable Member for Tellian, the proposal for the implementation of the Integrated SPK Kampung Penakub Hilir/ Kampung Datuk, Mukah will commence in RMK-13. As for the SPK Kampung Kuala Lama, the Village Development and Security Committee concerned is advised to submit an application for the establishment of the SPK in question.

For the information of the Honourable Member for Ngemah, the implementation of basic infrastructure for SPK Nanga Ngungun will be proposed in RMK-13.

For the information of the Honourable Member for Beting Maro, SPK Beladin has been approved in RMK-13 with an allocation of RM800,000 under Rolling Plan 2 (2027). The Lands and Surveys Department will apply for additional allocation to enable the implementation of infrastructure with new specifications to be carried out in RMK-13 later.

For the information of the Honourable Members for Balingian and Tellian, applications to upgrade existing infrastructure in SPS and SPK to new specifications will be considered based on needs and the availability of funds.

For the information of the Honourable Members for Ngemah and Tamin, the Government will give priority to gazetting the settlement areas involving longhouse sites in the former RASCOM settlement area as Bumiputera Communal Reserve (Longhouse) land under Section 6 of the Sarawak Land Code.

For the information of the Honourable Member for Tellian, based on the records of the Sarawak Lands and Surveys Department, there are two housing development projects facing issues of not yet having received land titles. The projects are Taman Desa Kenanga, involving Lot 124 Block 50 Mukah Land District, and Taman Desa Cempaka, involving Lot 303 Block 52 Mukah Land District. The issuance of individual subdivided land titles for both these projects has not yet been finalised because the developer company, as holder of the Power of Attorney (Irrevocable), has been dissolved, which has made the execution of the Memorandum of Surrender and Alienation (MOSA) impossible. At present, the Lands and Surveys Department, together with the Sarawak Attorney General's Chambers, is examining legally based resolution methods.

Meanwhile, for Taman Perumahan Episo, land titles for the subdivided lots known as Lot 1255 to 1312 Block 50 Mukah Land District were registered on 15 January 2020 and were handed over to the developer's representative on 16 January 2020.

For the information of the Honourable Member for Baleh, the site regularisation for the existing Tunoh Health Clinic, located on Lots 693 and 694 Block 26 Majau Land District, was approved on 3 November 2025.

For the information of the Honourable Member for Ba'Kelalan, the proposal and gazetting of a Protected Forest under the Forests Ordinance 2015 will not erode the privileged rights of the local community to continue traditional activities, because they are listed in detail in the Second Schedule to ensure that the privileged rights of local residents are preserved.

On 16 October 2024, the Government, through the Sarawak Forest Department, held a briefing and dialogue session in Lawas, together with Community Leaders, Tribal Chiefs and several relevant government agencies, on the proposal to establish the Ulu Trusan Protected Forest.

Furthermore, an Enquiry into Claims session was conducted from 23 to 31 October 2025 at Long Sukang Hall, Lawas, to conduct interviews with 216 individuals from 22 villages around the proposed area. The communities involved have taken note that the Ulu Trusan Protected Forest is still at the proposal stage, and the proposed area of 120,845 hectares published in the initial gazette will be finalised after taking into account the views of all stakeholders.

For the information of the Honourable Member for Pending, the Government, through the Sarawak Forestry Corporation (SFC), is in the process of final review to amend the Wildlife Protection Ordinance, 1998, including listing the pangolin in English, tenggiling in Malay, scientific name Manis Javanica, and several other wildlife species, namely the sun bear, flying lemur and wild cat, from the status of Protected Animal to the status of Totally Protected Animal. Should there be any new species found in the future, we might consider naming the pangolin, Manis Violenica, if you don't mind?

In terms of enforcement, the Government of Sarawak, through SFC and other relevant enforcement agencies, using the latest technology, will continue enforcement operations from time to time, in addition to awareness campaigns conducted through official media and social media. These operations are carried out across international borders, where collaboration with Indonesia and Brunei is also being intensified.

For the information of the Honourable Members for Bukit Assek and Bawang Assan, the Master Plan for the Bukit Assek Redevelopment Project was approved by the State Planning Council (MPN) on 1 October 2025. Public components such as the construction of Wetland Park 1 and housing for the affected residents have been planned to be implemented in phases in RMK-13. Meanwhile, engagement sessions will continue to be carried out with all stakeholders as required.

For the information of the Honourable Member for Stakan, every development plan implemented will indeed go through the process of obtaining input from stakeholders, including the Honourable Members in the areas involved. This engagement will be further intensified in future to ensure that all parties receive accurate information and at the same time have the opportunity to provide constructive input.

For the information of the Honourable Member for Tanjong Datu, any development activity on land sites is subject to the provisions under Part X, Sarawak Land Code, as well as the Sarawak State Planning Standards and Guidelines Manual. Homestay owners are advised to liaise with the Sarawak Ministry of Tourism, Creative Industry and Performing Arts (MTCP) to ensure that homestay operators can operate safely and register lawfully. Among the approaches used is the process of facilitating registration for the Malaysia Homestay Experience Programme. In Sarawak, the basic registration requirements under this programme, which is supervised by MTCP, adopt the guidelines set by the Ministry of Tourism, Arts and Culture Malaysia (MOTAC).

For the information of the Honourable Member for Tanjong Datu as well, the application for the Metang Terap settlement area to be gazetted as village reserve land under Section 7 of the Sarawak Land Code has been approved.

For the information of the Honourable Member for Telang Usan, LCDA will submit a proposal for affordable housing development at RGC Long Lama for phased implementation in RMK-13.

Mr Speaker, I conclude this winding-up speech with three pantun:

The tempua bird flies across, Its nest woven beautifully and radiant; The highest appreciation is expressed sincerely, Bringing well-being to the state.

The sweat of farmers moistens the soil, The strength of effort brings blessings; The Premier's Budget is anchored in trust, Upholding the people and raising their dignity.

The oral questions have been unravelled, My pantun is very short; The winding-up speech has just concluded, See you again in the new year.

On this occasion, I would like to record my thanks to Mr Speaker, the Deputy Speaker, the secretariat of the State Legislative Assembly and all who were directly and indirectly involved in making this sitting a success, including the officers of my ministry and the departments and agencies of the government under this ministry.

I also extend Merry Christmas to those who celebrate it, and a happy welcome to the New Year 2026 to all.

That concludes my winding-up speech for the Ministry of Natural Resources and Urban Development. Thank you.

Mr SpeakerEN

Honourable Members, we have a break, sitting resume at 10 past 11.00 a.m.

(Meeting suspended at 10.42 a.m.)

(Meeting resumed at 11.29 a.m.)

Mr SpeakerEN

With respect, I invite the Honourable Dato Sri Roland Sagah Wee Inn, Minister of Education, Innovation and Bakti Development, to deliver the winding-up speech.

Dato Sri Roland Sagah Wee InnPBB · GPSMinister of Education, Innovation and Talent Development · Tarat

Thank you, Tuan Speaker. Not Bakti just now, should be Bakat. Sorry to correct you.

A very good morning. Salam Sarawak Maju Makmur. Salam Segulai Sejalai. Indi awang, indi asung.

Firstly, Tuan Speaker, I wish to acknowledge the presence of Ketua Masyarakat dan Ketua Kaum dari kawasan Tarat which is, who are observing our proceedings today at the gallery (Applause). On the same note, I also wish to acknowledge the presence of teachers and students who were curious to see how our proceedings are going on this morning, they are all around in the gallery, tepuklah. (Applause)

Tuan Speaker, first and foremost I would like to congratulate the Right Honourable Datuk Patinggi Tan Sri (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Premier of Sarawak on being conferred “the Order of the Rising Sun, Gold and Silver Star”, by the Government of Japan in recognition of his outstanding contributions to strengthening Japan-Malaysia relationship.

Tuan Speaker, it is with a great pleasure that I congratulate you, on your reappointment as the Speaker of the Sarawak State Legislative Assembly, the said for the 10th time.

The same time, my congratulations also go to the Honourable Members of this august House who were recently conferred State Awards including the Panglima Gemilang Bintang Kenyalang (P.G.B.K.) that carries the title of “Datuk”, the Panglima Setia Bintang Sarawak (P.S.B.S.) that carries the title of “Dato”, and the Pegawai Bintang Sarawak (P.B.S.), in conjunction with the 79th birthday celebration of His Excellency the Governor of Sarawak.

Tuan Speaker, let me address this august House on the development pertaining to my ministry. I would like to express my sincere appreciation to the Right Honourable Premier of Sarawak for allocating a substantial amount of RM665 million for the Ministry of Education, Innovation and Talent Development in the 2026 Budget.

Matters relating to education. Allow me now to touch on several key matters relating to education in Sarawak.

EDUCATION

Sarawak Education Enhancement Programme (SEEP)

Following the Right Honourable Premier of Sarawak’s announcement of RM20 million for Sarawak Education Enhancement Programme (SEEP) 2026, my ministry will ensure its effective and efficient implementation. We thank you sir, for this allocation and your unwavering support for education. This year’s SEEP has shown encouraging progress. Beyond the number of students who benefitted, a major achievement was the development of customised teacher modules for each subject involved teaching modules. These modules, produced jointly by the ministry and the Sarawak State Education Department (JPNS), will be fully utilised in 2026 to better support teachers and to help students master the core subjects more effectively.

In October, my ministry also carried out a series of post-mortem workshops across five zones to review SEEP 2025. We have identified areas that require improvement, and my ministry will take the necessary actions to strengthen the programme moving forward.

Dual Language Programme Sarawak (DLP Sarawak)

The Dual Language Programme (DLP Sarawak) continues to be one of our main strategies to uplift the standard of education in Sarawak. By strengthening proficiency in English, Science and Mathematics, DLP Sarawak is helping to prepare our students to be more competitive and better equipped for the future. This is especially important as we work towards increasing enrolment in STEM fields and producing high-quality graduates among anak Sarawak. Beginning 2026, DLP Sarawak will be extended to secondary schools, starting with all Form 1 students. These students will continue with DLP Sarawak until Form 5, where at upper secondary level (Forms 4 and 5), pure science subjects such as Biology, Chemistry, Physics, and Additional Mathematics will also be taught fully in English.

Ujian Penilaian – Dual Language Programme Sarawak (UP-DLPS) 6 Assessment

Tuan Speaker, the Ujian Penilaian – Dual Language Programme Sarawak (UP-DLPS), six examination was successfully conducted on the 15th and 16th October this year where DLP Sarawak was first implemented in 2020. A total of 1,050 government, government-aided and private schools that are implementing DLP Sarawak, involving 29,002 Year 6 pupils, participated in the UP-DLPS 6 for Mathematics and English.

A similar number, about 29,000 pupils, sat for the Science paper. This assessment evaluates students’ proficiency and understanding in Science, Mathematics, and English, taught under the Dual Language Programme in Sarawak. It provides valuable insights into the progress and effectiveness of the DLP Sarawak’s implementation in our schools.

With an overall passing rate of 90.97%, English achieved the best results among the three subjects. This performance validates the success of our current English proficiency initiatives.

Science performance is encouraging but the number of high achievers are quite low, suggesting to the need for more effective teaching and learning approaches in Science. The overall passing rate for Science is 84.71%.

Mathematics remains the most challenging subject, particularly in rural schools and Sekolah Kurang Murid (SKM). The overall passing rate for Mathematics is at 61.01%. This area requires immediate and focused intervention.

These results tell us clearly that much more needs to be done, particularly in Mathematics. Mathematics and Science form the foundation of Science, Technology, Engineering, and Mathematics (STEM), and if we are to build a highly skilled workforce by 2030 and beyond, strengthening these subjects must remain an urgent priority. My ministry will continue to intervene where necessary to ensure better outcomes in the coming years.

ICT and Digital Literacy Among Teachers and Students

Tuan Speaker, digital literacy will remain a key priority in 2026 and the years ahead. In 2025, several initiatives including STEM Catalyst, were successfully implemented, which reached more than 160 rural schools and engaged over 6,000 students through hands-on activities in robotics, coding and hydrogen fuel. Another major effort was the Future Skills for All programme, delivered in collaboration with United Nations Children's Fund (UNICEF) and the Ministry of Education (MOE).

It provided essential coding and computing exposure to 4,161 students and teachers from 161 schools. Together, these initiatives aim to nurture stronger interest and better performance in STEM among our students.

We want all our students, especially those in the rural areas, to have equal access to digital tools and learning opportunities. More hands-on and practical activities will be introduced to build digital skills and confidence.

My ministry will keep working with private partners, non-governmental organizations (NGOs) and government agencies to widen the reach and impact of our programmes, ensuring that no child in Sarawak is left behind in this digital era.

School Infrastructure Improvement

Improving school infrastructure, especially dilapidated schools, remains an ongoing effort. As I have mentioned in previous State Legislative Assembly sessions, resolving these issues will take time due to the scale and age of many of our schools.

However, the Sarawak Government remains committed to ensuring safe and conducive learning environments for our teachers and students. My ministry will continue to work closely with MOE and JPNS and the Public Works Department (JKR) Sarawak as the main implementing agency to ensure that dilapidated schools become a thing of the past.

Now, I would like to address the key education matters raised during this sitting.

Issue Raised by the Honourable Member

Dato Sri Roland Sagah Wee InnPBB · GPSMinister of Education, Innovation and Talent Development · Tarat

School infrastructure development

For the information of the Honourable Member for Jepak, the MOE plans to construct three new primary schools, two secondary schools and one Kolej Tingkatan Enam (KTE) in the Jepak constituency and with implementation proposed under the Thirteenth Malaysia Plan (13MP).

For the information of the Honourable Member for Kalaka, SK Haji Bollah, Saratok has been proposed under the 13th Malaysia Plan (13MP), Rolling Plan 2 (RP2).

For the information of the Honourable Member for Balingian, the construction of SMK Balingian near Stadium Balingian is undergoing re-tendering, expected in the first quarter of 2026.

For the information of the Honourable Member for Pelagus, there are eight schools with development projects scheduled under various Rolling Plans of the 13th Malaysia Plan, as well as the Ubah Suai Naik Taraf (USNT) 2026 programme within kawasan Pelagus.

For the information of the Honourable Member for Ngemah, be rest assured that my ministry will continue to work closely with the JPNS and state authorities to address those issues that were raised.

For the information of the Honourable Member for Bukit Semuja, SMK Serian No. 2 has been proposed for inclusion under RP2 of the 13th Malaysia plan, with the state site approved by the State Planning Council; and Land and Survey Department on 13th September 2024. Meanwhile, the slope maintenance works as at SMK Tebakang have also been approved and will be implemented soon under JKR Serian Division.

For the information of the Honourable Member for Ngemah, under the 13MP RP2, site acquisitions have been proposed for SK Nanga Jagau and SK Nanga Balingiau. Betul nyak ka? Balingiau? For SK Nanga Nirok, the school remains in a conducive condition, although access is occasionally restricted during floods. The MOE is committed to providing maintenance and upgrading support while awaiting approval under the 13MP Rolling Plan.

For the information of the Honourable Member for Tamin, there are seven schools in the DUN Tamin area. SMK Ulu Balingian was approved under the 12MP RP4. SK Nanga Kua, SK Nanga Tajam, SK Nanga Selangau and SMK Luar Bandar No. 1 have been proposed under the 13MP plan. Meanwhile, the remaining 12 schools are proposed for the Ubah Suai Naik Taraf (USNT) project in 2026.

For the information of the Honourable Member for Daro, JKR Sarawak has issued a ‘Notice of Default’ to the contractor of SK Penasu Daro as the progress on site has been unsatisfactory and the contractor has failed to meet the set targets. JKR Sarawak is closely monitoring the situation for further action.

For the information of the Honourable Member for Krian, my ministry appreciates your concern regarding the issue of dilapidated schools. The proposal for the replacement of the deteriorated SMK Saratok building will be submitted under RP3 of the 13th Malaysia Plan. However, a seven-acre site for SK Ulu Kabo has already been approved.

Sarawak Enhancement Education Programme (SEEP)

For the information of the Honourable Member for Batu Danau, SMK Mendamit has been included under SEEP since the beginning of the programme.

Ujian Penilaian - Dual Language Programme Sarawak (UP-DLP Sarawak)

For the information of the Honourable Member for Tellian, the Sarawak Dual Language Programme Assessment (UPDLP Sarawak) for Year 6 evaluates students’ proficiency in Science and Mathematics, taught fully in English since 2020.

This summative assessment includes written and comprehension tests with various question types, all developed by expert teachers and verified by the Cambridge University Press & Assessment (CUPA).

Others

For the information of the Honourable Member for Katibas, my ministry and JPNS are analysing the UP-DLP data to enable focused intervention for our students and schools. On the suggestion concerning Science laboratories facilities, my ministry will consider this matter after conducting necessary engagement with the schools, JPNS, and all relevant agencies.

For the information of the Honourable Member for Tanjong Datu, Yayasan Sarawak has no immediate plan to set up Yayasan Sarawak Sport School.

For the information of the Honourable Member for Bukit Begunan, my ministry provides financial assistances to Persatuan Ibu Bapa dan Guru (PIBG) on a case-by-case basis. This approach ensures that their program remains aligned with the state's government policy. In 2025, RM1.013 million had been disbursed to PIBG for various activities.

To the Honourable Member for Stakan and Telang Usan, thank you for your concern regarding the matter of dilapidated school development. Be rest assured, my ministry will continue to work closely and collaboratively with relevant authorities, including the JPNS and other state agencies, to comprehensively address the issue.

To the Honourable Member for Tebedu, Repok and Balingian, thank you for the support to my ministry.

Higher Education

Dato Sri Roland Sagah Wee InnPBB · GPSMinister of Education, Innovation and Talent Development · Tarat

Free Tertiary Education Scheme

Tuan Speaker, I would like to express my thanks to the Right Honourable Premier of Sarawak for the allocation of RM250 million towards Free Tertiary Education Scheme, which will begin in January 2026.

I would like, now to update the august House on the FTES we call it, Free Tertiary Education Scheme. This scheme is only offered at: (a) Swinburne University of Technology Sarawak; (b) Curtin University Malaysia; (c) University of Technology Sarawak; and (d) i-CATS University College.

A total of 64 courses has been approved under FTES in these four schools, Sarawak-owned institutions of higher learning. The detailed list will be announced by the Right Honourable Premier in December 2025.

Included with this scheme is the stipend of RM15,000 to students from households with a per capita income of RM1,500 or below per month. Out of the RM15,000, RM5,000 will be allocated especially for accommodation. This amount will be channelled directly to the residential or housing unit at each Sarawak Institute of Higher Learning (SIHL) for them to manage on the students’ behalf.

The remaining RM10,000 will be disbursed directly to the students’ accounts through S Pay Global.

Free laptop and Book Voucher Initiatives

Following the Right Honourable Premier budget speech, I would also like to thank the Right Honourable Premier of Sarawak for the proposed allocation of RM32.5 million towards the Free Laptop and Book Voucher initiatives.

As of October of this year, we have successfully distributed 10,427 laptops and 4,364 book vouchers to eligible students across all institutions of higher learning in Malaysia.

Bantuan Kewangan Khas (BKK)

The Bantuan Kewangan Khas (BKK), or Special Financial Assistance, has delivered substantial support, with RM58.77 million having been disbursed to Yayasan Sarawak. To date, 40,378 deserving students who applied and met the eligibility criteria has received the assistance. Crucially, I am pleased to confirm our commitment to extending this assistance throughout 2026.

Issues Raised by the Honourable Member

Dato Sri Roland Sagah Wee InnPBB · GPSMinister of Education, Innovation and Talent Development · Tarat

For the information of the Honourable Member for Padungan, the proposal to extend the Free Tertiary Education Scheme (FTES) to include all Sarawakian students attending universities across Malaysia, including University of Malaysia Sarawak (UNIMAS) and Universiti Teknologi MARA (UiTM), is not feasible under current policy. While Federal Government public universities (IPTA) already charge very minimal fees, making them already affordable for all, UNIMAS and UiTM still fall outside the financial and administrative jurisdiction of the Sarawak State Government's FTES.

Implementing a tuition-free scheme for these federal institutions nationwide would require a policy decision and funding from the Federal Government and the Ministry of Higher Education (MOHE).

The Sarawak Government is maintaining a focused approach by strategically investing in its own institutions to enhance quality, boost enrolment, and align academic programmes, especially in school critical sectors like Science, Technology, Engineering, and Mathematics (STEM); Law, Medicine, Accounting and Finance, with the state’s specific economic and talent development needs.

To the Honourable Member for Opar, Tanjong Datu, Tupong, Batu Kitang, Pelagus and Batu Danau, thank you for your support and recommendations to my ministry. The full information about Free Tertiary Education Scheme (FTES) will be revealed by the Right Honourable Premier during the launching soon.

INNOVATION

Sarawak Innovation Index (SARii)

Sarawak Innovation Index (SARii), not the Indian saree. This one only SARii, double i. Tuan Speaker, I am pleased to report that over the past year, my ministry has made substantial progress on the development of the Sarawak Innovation Index (SARii). We have outlined all the critical details and indicators required for the SARii framework, drawing from international best practices and tailoring them to Sarawak’s unique innovation ecosystem.

This year, we conducted engagement sessions with key partners at both the federal and state levels, including Ministry of Science, Technology and Innovation (MOSTI); Malaysian Industry-Government Group for High Technology (MIGHT), MIGHT ya, not our MEITD, relevant federal agencies, and state agencies.

These engagements were highly productive, providing valuable inputs, strengthening alignment, and establishing a shared understanding between the Federal and State Governments on the development and strategic importance of SARii.

I am also pleased to inform this august House that SARii has been included under the 13th Malaysia Plan Budget. We anticipate commencing formal development of this important framework in the first quarter of 2026. This marks a major milestone as we transition from planning to the implementation phase of Sarawak’s long-term innovation measurement and benchmarking initiative.

STEM and Innovation

Tuan Speaker, our commitment to building a robust STEM and innovation ecosystem remains steadfast and undiminished. This year, my ministry has significantly expanded and diversified our programme offerings, including:

(a) STEM Trailblazers; (b) Sarawak Space Challenge in partnership with NASA, USA; (c) The Junior and Young Innovators Challenge; (d) Techlympics; (e) The National Robotics Competition; (f) SMD Semiconductor Sarawak IC Design Make-a-Thon; (g) Girlscode Mobile Apps Challenge; (h) Planetarium Exhibitions; and (i) International RoboMaster Challenge, and a wide range of STEM outreach programmes.

In total, more than 80 initiatives have been delivered across schools, educational institutions, and universities throughout Sarawak. To further strengthen our robotics ecosystem, my ministry has distributed LEGO SPIKE Prime kits to 26 schools across Sarawak. Training has been provided to teachers and students, including those from remote, rural, and urban communities, to encourage advanced coding, engineering design, and robotics innovation.

Tuan Speaker, I am proud to highlight the exceptional achievements of our students in robotics competitions at both the national and international levels. Sarawak teams emerged as Overall Champion at the 2025 World Robot Olympiad (WRO) Invitational in Weifang, China. The RoboNova-X team from Institut Pendidikan Guru (IPG), Sarawak Miri Campus was crowned champion at the WRO Europe Open Championship in Slovenia, surpassing 210 teams from 45 countries. Two teams from IPG Sarawak Miri Campus also won the overall championship at the WRO Open Championship Asia Pacific in Manila.

Tuan Speaker, I am proud to announce that Malaysia emerged as the overall champion at the 2025 World Robot Olympiad Final in Singapore last week (Applause) with Sarawak representing the nation with distinction, clap again (Applause) with distinction, and from Sarawak, Sarawak First.

The national team secured four gold, four silver, and two Excellent Awards, with SMK Chung Hua (CF), confirming school, it means they follow the syllabus, the national syllabus, Miri notably contributing two gold and one silver. I can see the Mayor of Miri is smiling widely there across the floor.

Additionally, Sekolah Kebangsaan Dato Mohd Musa from Samarahan attained multiple awards at the 2025 International Innovative Technology Summit and the 9th Shengxuan Youth Tech Asia Challenge in Tianjin, China. So, we are really international.

In sum, our commitment is advancing quality STEM education and achieving the 60% STEM enrolment target remains unwavering. We are building capacity, nurturing talent, and supporting innovation at every level, from primary schools to universities, and from the rural districts to global platforms. Now, I go to agencies under my ministry.

Sarawak Biodiversity Centre (SBC)

I shall now highlight milestones and achievements by the Sarawak Biodiversity Centre or SBC.

On the 4th of November 2025, I witnessed the exchange of Sarawak’s fourth Benefit Sharing Agreement (BSA) with five Iban communities for the Engkerebai plant, which is traditionally used as the red dye for the pua kumbu but now, it has a modern application in cosmetics as a brightening cream for skin, to make us look fairer. Anybody interested?

This BSA, along with the launch of “Trove Borneo” commercialising local essential oils with a Singaporean company on the 19th November 2025 is also in partnership with indigenous communities. Both this venture showcase how SBC’s documentation of traditional wisdom and validation through scientific research is taking off and may bring a new industry to Sarawak.

More recently, I also witnessed a Memorandum of Understanding (MOU) on the Sipudun plant just last week at the Dewan Undangan Negeri. This MOU is between SBC and the Department of Veterinary Services, to further test a local plant for anthelmintic or deworming process in ruminant livestock. This will offer a local and natural solution to existing chemical-based medication where these worms have begun to show antibiotic resistance contributing to a global problem for livestocks.

This integration of tradition and science not only puts Sarawak in the forefront of the current trend in governing access and benefit sharing but also create new economic potentials for Sarawak and its communities.

To fully realise the commercialisation of these discoveries and ensure this sustainable value chain, the Sarawak Biodiversity Council has established BioVerde Technologies Sdn. Bhd. (BVT) earlier this year. This is the commercial arm. BVT will engage with the private sector to capitalise on this green value chain, the word is green which make it more attractive, ensuring that the economic opportunities arising from our biodiversity translate into commercial products, and tangible benefits for our communities.

Sarawak Research and Development Council (SRDC)

Tuan Speaker, the Sarawak Research and Development Council (SRDC) has invested RM18.3 million into 80 research projects, focusing on high-priority areas such as biotechnology, biomedical innovation, green energy, and sustainable industrial materials. These initiatives are crucial for enhancing health security, renewable energy development, and circular bioeconomy applications, thereby reinforcing Sarawak’s commitment to the UN Sustainable Development Goals (SDGs).

SRDC’s performance is strong, demonstrated by effective fund utilisation, growing contributions to intellectual property (IP) and high-impact projects such as the SBC Spike Protein Inhibitor and Swinburne University Smart Efficient Buildings Research, which provide tangible benefits to public health and infrastructure efficiency.

To strengthen its future impact, SRDC is implementing key initiatives, including the upcoming 2026 Strategic Research Grant Call focused on sectors like sustainable petrochemicals, aerospace manufacturing, and semiconductors. This year also saw the launch of INNEX Sarawak, an innovation accelerator framework designed to bridge industrial research and development (R&D) and commercialisation.

Furthermore, the SRDC is nurturing early STEM talent through youth innovation programmes such as BrightSparx and the Premier’s Brightsparx Innovation Award, while the KamekPintar IP Management System is set to streamline IP submission and commercialisation processes, ensuring a transparent and efficient innovation ecosystem.

Tuan Speaker, to achieve a more efficient and leaner organisation, Sarawak Government has decided to merge the Tropical Peat Research Institute (TROPI) under the Sarawak Research and Development Council (SRDC). This integration aims to ensure more focused and efficient research and development, allowing for better resource allocation.

Sarawak Science Centre (SSCiex)

Tuan Speaker, the Sarawak Science Centre (SSCiEX) construction stands at 85.35% completion and is scheduled for full completion by December 2025. A soft launch is targeted for July 2026. In conjunction with its physical development, SSCiEX has engaged students through established programs, including the STEM Catalyst Raspberry Pi 2025 workshops, participation in Minggu Sains Negara, and the Kembara Sains Borneo travelling exhibition which reached 14 schools.

To ensure equitable access to quality STEM education, the Common Science Lab (CSL) initiative, developed under the SRDC for schools lacking facilities, successfully piloted at the Sarawak Biovalley Pilot Plant. Based on this success, the SRDC Council approved the expansion of the CSL under Projek Rakyat to five new locations, which are Serian, Kapit, Betong, Sri Aman, and Lawas.

Sarawak Infectious Disease Centre (SIDC)

Tuan Speaker, the physical development of the Sarawak Infectious Disease Centre (SIDC) project currently stands at 40.19% as of October 2025, with completion scheduled for October 2026.

Since beginning its operations in February 2024, SIDC has expanded its work across research, administration, and facility management. Current works prioritize research on disease prevalence, diagnostics, and early vaccine and biotherapeutic capability, focusing specifically on diseases such as Tuberculosis (TB), malaria, dengue, African swine fever, rabies, filariasis, and soil-transmitted parasitic infections.

SIDC has consolidated partnerships for diagnostics, vaccine development and surveillance, including NDAs with Quantoom Biosciences and EnsiliTech to support the VaxBioD vaccine programme under 13MP worth RM50 million, targeting Sarawak’s first home grown vaccine by 2030.

Disease surveillance conducted in Bau, Padawan, Serian and Sri Aman will expand statewide in 2026. This expansion will be supported by two major elimination programmes: (a) The Sarawak Cervical Cancer Elimination Programme, funded at RM18 million; and (b) The Tuberculosis Elimination Programme, funded at RM15 million.

Additionally, SIDC has launched the PhenomeSk cohort to build Sarawak’s genome database and advance precision medicine for local populations.

SIDC is rapidly enhancing its research and talent capacity through high-impact international collaborations and funding, including the establishment of the Ali Wallace Joint Research and Training Centre with Murdoch University, which will see an offshore SIDC office opened in Australia by mid 2026 to facilitate shared expertise and training.

CRAUN Research Sdn. Bhd.

Tuan Speaker, CRAUN Research Sdn. Bhd. is advancing the Sarawak Sago industry through research and commercialisation. In 2025, they successfully developed high-yielding sago planting materials and the FERTARA fertilizer to increase productivity. I think FERTARA must have been suggested by Ahli Yang Berhormat Datuk Stephen Rundi, ahli FERTARA dia.

In 2026, CRAUN will collaborate with Sarawak Fertiliser Sdn. Bhd.; and the Sago, and Nipah Development Board (SNDB) to commercially scale up and supply these materials for the statewide rehabilitation of sago smallholders’ areas. To improve smallholder income and competitiveness, CRAUN and SNDB will introduce the Sago Log Quality Guidelines and a quality-driven pricing mechanism in 2026, supported by digital tools like Sago starch quantification machine (SQPro), to ensure fair pricing for high-quality logs.

Also in 2026, CRAUN will collaborate with industrial partners to scale up sago product commercialisation and support SNDB in deploying modern Nipah processing centres under the Betong Division Development Authority.

Sarawak Digital Economic Corporation (SDEC)

Tuan Speaker, Sarawak is strengthening its digital research and development landscape through the Centre of Excellence for Digital Economy, which facilitates collaboration between government, industry, and universities to build research capability and expand intellectual capital. The COE is strategically positioning Sarawak as a creator of technology, utilizing a RM9.1 million allocation under 12th Malaysia Plan to support 60 projects and involve over 450 researchers and postgraduate students.

This Research and Development (R&D) effort is amplified by the Tech to Impact initiative and Sarawak Digital Economic Corporation (SDEC) technology accelerator programmes, which have already assisted 47 university teams, generated RM3.33 million in commercialization revenue, and produced seven spin-off companies. The process of innovation validation is reinforced through essential testbeds including the Smart City, Smart Agriculture, and IR4.0 Prototyping Labs to ensure new technologies are rigorously tested, refined, and ready for swift market adoption.

The digital talent pipeline is being significantly enhanced through the Digital NexGen flagship programme, anchored by the Science on Wheels initiative. This initiative's components, which include district Science, Technology, Engineering, and Mathematics (STEM) communities, STEM Ambassadors, and national competition pathways, have successfully reached more than 12,000 students across 932 rural schools.

Complementing this, Makeramai Marketplace serves as a central hub for digital innovation, hosting major events like the Sarawak Space Challenge and GirlsCode Challenge, while operating daily as a workspace and prototyping Centre for students, teachers, and innovators.

Sarawak’s global digital positioning is progressing through the Sarawak Digital Research Program (SDRP), which aims to attract international digital talent. The DE Rantau Sarawak Pass pilot has approved its first group and received 78 applications from highly skilled industries, contributing to local spending and talent exchange.

Simultaneously, the technopreneur landscape is growing by supporting founders and ideas through accelerators like the Digital Innovation Hubs, Founders Forge, (DiVA), and SaSAR, which collectively strengthen Sarawak’s competitiveness as a regional centre for digital innovation and entrepreneurship.

Mr Speaker

Honourable Minister, you have three minutes to conclude your speech.

Dato Sri Roland Sagah Wee InnPBB · GPSMinister of Education, Innovation and Talent Development · Tarat

Wow… laugh… then I would not be able to answer the Honourable Members… laju, accident nanti.

SMD Semiconductor

Tuan Speaker, the SMD Talent Development Programme 2025 is actively accelerating the growth of high-skilled semiconductor talent, aiming to achieve Sarawak’s goal of a 30% skilled workforce by 2030.

This initiative strengthens Sarawak’s position as a regional innovation hub by ensuring engineers gain real industry experience through hands-on chip development projects with partners like XFAB, ensuring meaningful technology transfer and building a future-ready talent pipeline for the sector. We have many programs done with SMD and I believe this will continue to establish more expert industrial.

Sarawak Artificial Intelligence Centre (SAIC)

Sarawak Artificial Intelligence Centre which has been set up also under my ministry and under the 2026 Budget specifically, RM5 million has been allocated for initiatives across key sectors leading to healthcare, agriculture, education, and manufacturing.

Crucially, the Premier has articulated a long-term objective for Sarawak to develop its own AI model, DeepSAR, by 2030. This model will be homegrown, built specifically to understand Sarawak's unique data, industries, and socio-economic landscape. This will position us in the global AI revolution.

Talent Development

On talent development, the Sarawak Talent Policy Study is advancing well. My ministry is finalizing the appointment of a consultant to spearhead the development of the Sarawak Talent Development Policy and Blueprint, as mandated under the Sarawak Budget 2026. And I hope we will finalize it by 2026. Through the Industry Continuous Professional Development (ICPD), my ministry successfully delivered the Occupational Safety and Health Coordinator’s course across seven series, engaging 89 participants from key sectors including manufacturing, agriculture, tourism, mining and social services.

Furthermore, in a strategic effort to match talent with business needs, we have collaborated with the key government bodies including the Ministry of Women, Early Childhood and Community Wellbeing Development; Ministry of Public Health, Housing and Local Government Sarawak; and the Ministry of International Trade, Industry and Investment Sarawak; collectively reaching 289 participants across these impactful initiatives. And we are proceeding with the SPEAK Programme where we will get counsellors from school across 4,188 school leavers and 175 counsellors that will register themselves or the average, they register themselves under the SPEAK programme or Sistem Pesanan Kerjaya as a revenue for them to search for their future career path. We have also carried out the Sarawak Human Capital Briefing in 2025 together with relevant industries. This is to meet what we require for the future workforce.

How many minutes more? Habis already? There will be a lot of things which I cannot tell you all.

Technical and Vocational Education and Training (TVET) Conference

The Green Mobility Innovation Summit was successfully held in Kuching, attracting over 700 delegates to discuss sustainable transportation under the theme: “Driving the Future”. Featuring discussions led by over 30 experts on clean energy and smart transport, the event reinforces Sarawak’s commitment to the PCDS 2030 goal of becoming a low-carbon state and its position as a regional leader in green innovation.

WorldSkills Malaysia-Sarawak

The fourth edition of WorldSkills Malaysia Sarawak 2025 supported by Department of Skills Development Malaysia and the Ministry of Human Resources is concluding with the Majlis Anugerah Tangan Emas Premier Sarawak 2025 on 15th December. This competition’s standard has been significantly to be on par with the national level with the introduction of 21 skill sets ready for World Skills Malaysia Sarawak competition. I am glad to announce that Encik Muhammad Safwan bin Habib, a Sarawakian student from Politeknik Kuching Sarawak won the Medallion for Excellence in IT Network Systems Administration at WorldSkills ASEAN, Manila 2025.

Sarawak Skills

Sarawak Skills remains a leading TVET institution, with a current enrolment of 2,235 students while training 3,776 working adults across 26 specialized programmes. With a high 93% employability rate within six months of graduation, the institution continues to populate the workforce with industry-relevant skills, directly supporting the state’s talent development agenda under the post COVID-19 Development Strategy 2030.

Centre for Technology Excellence Sarawak (CENTEXS)

CENTEXS is rapidly expanding its physical footprint and specialised training areas with the launch of new regional campuses. The CENTEXS Lawas campus, launched on 25th August 2025, serves a technology training hub for the region including Sabah, Brunei and Indonesia specializing in areas like Green Mining and Quarrying and Green Asphalt industries.

Further expansion includes the CENTEXS Dalat campus, launched on 29th November 2025, just a few days ago, YB Dato Sri Hajah Fatimah Abdullah said, best! which focuses on culture and heritage, green mobility, caregiver training, and sustainable development. The Dalat campus notably includes a Language Technology Centre offering specialized programmes in Melanau, Malanau or Melanau? Melanau ahh. Mandarin and English, developed in partnership with University of Malaysia Sarawak (UNIMAS) and University of Technology Sarawak (UTS).

So, I am very sorry other Honourable Members. Due to constraint of time, I am not able to answer all matters raised by you, but rest assured that we are open at anytime during office hours for answers. So, anyway, our Tuan Speaker is very strict ni.

As I draw my remarks to a close, I would like to extend my sincere gratitude to the Honourable State Secretary, the State Attorney General and the State Financial Secretary, along with all state and federal ministries, departments and agencies, for their steadfast cooperation and support.

My appreciation also goes to the dedicated officers and staff of my ministry and its agencies, whose hard work has ensured that all our responsibilities are carried out effectively.

I further wish to convey my utmost appreciation and commendation to the Honourable Tuan Speaker, the Deputy Speaker, and the entire team of the State Legislative Assembly for their exemplary management of this sitting.

As the year draws to a close, I would like to take this opportunity to wish all Christian members in this august House and across our state a truly joyful and blessed Christmas. May this festive spirit extend to everyone as I also extend my heartfelt greetings for a Happy and Prosperous New Year 2026 and with those remarks, I hereby support the Budget 2026. Thank you.

Mr SpeakerEN

Honourable Members, we have a lunch break. Sitting resume at 2.30 p.m.

(Meeting suspended at 12.40 p.m.)

(Meeting resumed at 2.39 p.m.)

[Deputy Speaker presided over the Meeting]

Deputy SpeakerEN

Honourable Members, let us continue with the winding-up speeches by the Ministers. With respect, I invite the Honourable Dato Sri Haji Julaihi bin Haji Narawi, Minister of Utilities and Telecommunications, to deliver the winding-up speech. Please proceed, Dato Sri.

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

Thank you, Mr Speaker, for allowing me to deliver the winding-up speech for the Ministry of Utilities and Telecommunications Sarawak.

First, I would like to extend my warmest congratulations to the Honourable Premier of Sarawak on the conferment of the "the Order of the Rising Sun, Gold and Silver Star" by the Government of Japan to the Honourable Premier of Sarawak recently. This honour reflects international recognition of his efforts in advancing green energy and positioning Sarawak as a leader in this region. We, the people of Sarawak, are very proud of the leadership of the Honourable Premier of Sarawak, who has brought honour to Sarawak on the world stage.

This can be proven by the recognition from foreign countries, as the Honourable Premier is frequently invited to share knowledge and experience, particularly in the renewable energy (renewable energy) sector in Sarawak. For your information, the Honourable Premier has also been invited to deliver the keynote speech at the International Water Association Water and Development Congress and Exhibition (IWA WDCE) 2025 in Bangkok, Thailand, which will be held next week.

I also wish to extend my warmest congratulations to the Honourable Tan Sri Datuk Amar Mohamad Asfia bin Awang Nasar on his reappointment as Speaker of the Sarawak State Legislative Assembly for a term of two years, beginning 16 November 2025 until 15 November 2027. This appointment expresses continued confidence in his leadership, authority and stature in steering this esteemed House.

Mr Speaker, now I return to the Budget 2026 that was tabled by the Honourable Premier of Sarawak. I record my warmest congratulations to the Honourable Premier of Sarawak on the tabling of the Budget 2026. This Budget is clearly based on holistic development and the empowerment of the people in facing global economic challenges, in line with the theme "Empowering People, Advancing Prosperity, Building a Resilient Future".

This government's commitment is also reflected in the allocation under Budget 2026 amounting to RM12.9 billion. On behalf of the Ministry of Utilities and Telecommunications Sarawak, I record my deepest appreciation for the allocation of RM1.05 billion to implement critical projects covering water supply, electricity supply and telecommunications throughout Sarawak. My Ministry, together with all agencies under it, is always committed to ensuring that all projects are implemented efficiently and on schedule so that the people of Sarawak can fully enjoy the basic facilities planned by the government.

Water Supply

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

Mr Speaker, I will now touch on the latest developments regarding water supply development in Sarawak.

Water Supply Projects under the Malaysia Plans and Alternative Funding

The Sarawak Government has allocated a total of RM4.6 billion under the Twelfth Malaysia Plan (RMK-12) and Alternative Funding, involving the implementation of 407 projects. So far, 301 water supply projects, equivalent to 74%, have been completed, and the remainder are at various stages of implementation.

A total of RM597 million has been allocated for 2026 to implement water supply connection projects under the Thirteenth Malaysia Plan (RMK-13) and Alternative Funding.

Mr Speaker,

Water Supply Master Plan and Sarawak Water Grid System

To ensure holistic water supply security in Sarawak over the long term, the Sarawak Government is actively implementing the Sarawak Water Supply Master Plan and Water Grid System, which has shown positive impact.

Water supply coverage in rural areas has now reached 71%, compared with 61.9% in 2018. In urban areas, the coverage rate exceeds 99%, bringing the overall average coverage in Sarawak to 85.6%.

My ministry is currently actively developing the water supply grid system, including water intakes, water treatment plants, pipe installation, storage water tanks, booster pump stations and other related components in line with the Sarawak Water Supply Master Plan and Water Grid System. The implementation of the water supply grid is being carried out in stages across the whole of Sarawak, linking the southern region, central region and northern region.

Sarawak Water Supply Master Plan and Water Grid in the Southern Region

The water supply grid system in the southern region covers the divisions of Kuching, Samarahan, Serian, Sri Aman and Betong, involving the construction and upgrading of nine major water treatment plants and the installation of water grid pipelines with an estimated length of 1,132 km. All these projects are fully funded by the Sarawak Government itself.

For the information of this august House, three major water treatment plants have been completed and upgraded as follows:

(a) Batu Kitang Water Treatment Plant (Plant 2), Kuching, which was upgraded from 764 million litres of water per day (JLH) to 868 million litres of water per day (JLH) at a cost of RM106.4 million; (b) Slabi Water Treatment Plant, Serian, from 60 million litres of water per day (JLH) to 110 million litres of water per day (JLH) at a cost of RM53.9 million; and (c) Bayai Water Treatment Plant, Sri Aman, from 33 million litres of water per day (JLH) to 53 million litres per day (JLH) at a cost of RM21.7 million.

Meanwhile, six more projects are still at various stages of implementation as follows:

(a) Upgrading of Batu Kitang Water Treatment Plant (Plant 4) at a project cost of RM139 million, which will increase the overall capacity of Batu Kitang Water Treatment Plant from 868 million litres of water per day (JLH) to 968 million litres of water per day (JLH), and the physical progress of the project has now reached 35.5%;

(b) New Landeh Water Treatment Plant with a capacity of 200 million litres of water per day (JLH), tender is expected to be called next year;

(c) New Lundu Water Treatment Plant with a capacity of 20 million litres of water per day (JLH) at a project cost of RM112 million, where site works commenced in October last year;

(d) New Engkilili Water Treatment Plant with a capacity of 75 million litres of water per day (JLH), built at a cost of RM312.9 million, has now reached 0.6% physical progress, just started, Mr Speaker;

(e) Upgrading of Lubau Water Treatment Plant, Betong, from 30 million litres of water per day (JLH) to 60 million litres of water per day (JLH), built at a cost of RM169.5 million, has now reached 24.7% physical progress; and

(f) Upgrading of Kaki Wong Water Treatment Plant from 30 million litres of water per day (JLH) to 60 million litres of water per day (JLH), and it is now at the tender calling stage.

Mr Speaker, as for the water supply grid pipelines, 331 km of water grid pipeline has been completed in the southern region, while another 801 km of water grid pipeline is being and will be implemented to connect the whole of the southern region and subsequently be linked to the central region.

Sarawak Water Supply Master Plan and Water Grid in the Central Region

Mr Speaker, the Water Supply Master Plan and Water Grid System in the central region. The water supply grid system in the central region covers Sarikei, Sibu, Mukah and Kapit, involving the construction and upgrading of 12 major water treatment plants and the installation of water grid pipelines with an estimated length of 1,133 km. All these projects are also fully funded by the Sarawak Government itself.

For the information of the Members of this august House, three major water treatment plants have been completed and upgraded in the central region as follows:

(a) Bayong Water Treatment Plant, Sarikei, which was upgraded from 70 million litres of water per day (JLH) to 100 million litres of water per day (JLH) at a cost of RM68 million; (b) Tanjung Manis Water Treatment Plant with a capacity of 30 million litres of water per day (JLH) at a cost of RM105.4 million; and (c) Basong Water Treatment Plant, Mukah, from 15 million litres of water per day (JLH) to 60 million litres of water per day (JLH) at a cost of RM78 million.

Mr Speaker, meanwhile, nine more major water treatment plants in the central region are still at various stages of implementation as follows:

(a) Upgrading of Julau Water Treatment Plant from 1.6 million litres per day (JLH) to 5 million litres of water per day (JLH) at a cost of RM26 million, has now reached 88% physical progress;

(b) Another new Julau Water Treatment Plant with a larger capacity needs to be built to cater for water supply demand in the Julau District. Therefore, the New Julau Water Treatment Plant with a capacity of 30 million litres of water per day (JLH) has been approved and is now at the design stage;

(c) Upgrading of Salim Water Treatment Plant, Sibu, from 150 million litres of water per day (JLH) to 300 million litres of water per day (JLH) at a cost of RM269 million, has now reached 45.3% physical progress ahead of schedule by 10%. Ahead of schedule, Mr Speaker, because according to the schedule it should have been completed at a rate of 35%, but the work on the ground has now reached 45.3%;

(d) The upgrading of Salim Water Treatment Plant, Sibu, is the largest upgrading package in Sarawak at this time. This upgrading work is very important to cater for the existing water demand in Sibu and surrounding areas for the long term, because at the moment, Mr Speaker, Salim Water Treatment Plant supplies 150 million litres of water per day and Bukit Lima Water Treatment Plant supplies 45 million litres of water per day, meaning the water supply we can provide for Sibu is 195 million litres of water per day. But with the upgrading we are doing to 300 million litres of water per day, the people of Sibu will have more water supply in the future. So, this requires the patience of the parties concerned in Sibu until the Salim Water Treatment Plant is completed. Insya-Allah, Sibu will have more than sufficient clean treated water supply;

(e) New Kanowit Water Treatment Plant with a capacity of 25 million litres of water per day (JLH) was just awarded last October at a cost of RM185.1% …aih saya ulang ah… New Kanowit Water Treatment Plant with a capacity of 25 million litres of water per day was just awarded last October at a project cost of RM185.1 million;

(f) Upgrading of Basong Water Treatment Plant, Mukah, from 60 million litres of water per day (JLH) to 120 million litres of water per day (JLH) has commenced works last August at a project cost of RM243.98 million, and this is good news for friends and residents in the Mukah Division;

(g) Upgrading of Kapit Water Treatment Plant from 28.5 million litres of water per day (JLH) to 60 million litres of water per day (JLH) is now at the tender stage;

(h) Upgrading of Belaga Water Treatment Plant from 5 million litres of water per day (JLH) to 10 million litres of water per day (JLH) is now at the design stage. Belaga is the area of my Honourable Deputy, the Honourable Datuk Liwan Lagang;

(i) New Song Water Treatment Plant with a capacity of 20 million litres of water per day (JLH) is now at the tender evaluation stage; and

(j) Upgrading of New Sungai Asap Water Treatment Plant from five million litres of water per day (JLH) to 10 million litres of water per day (JLH), which is now at the design stage.

Mr Speaker, as for the water supply grid system pipelines, 186 km of water grid pipeline has been completed in the central region. Meanwhile, another 947 km of water grid pipeline is being and will be implemented to connect the whole of the central region and will be linked to the Northern Region.

Sarawak Water Supply Master Plan and Water Grid in the Northern Region

Mr Speaker, the Water Supply Master Plan and Water Grid System in the Northern Region. The water supply grid system in the Northern Region covers Bintulu, Miri and Limbang, involving the construction and upgrading of 11 major water treatment plants and the installation of water grid pipelines with an estimated length of 619 km. All these projects are fully funded, as I explained earlier, by the Sarawak Government itself.

For the information of the Members of this august House, three major water treatment plants have been completed and upgraded in the Northern Region:

(a) Nyabau Water Treatment Plant, Bintulu, which was upgraded from 254 million litres of water per day to 354 million litres of water per day at a cost of RM66.9 million; (b) Berawan Water Treatment Plant, Limbang, from 20 million litres of water per day to 40 million litres of water per day at a project cost of RM33.6 million; and (c) Trusan Water Treatment Plant, Lawas, which was upgraded from 20 million litres of water per day to 40 million litres of water per day at a project cost of RM29.2 million.

Meanwhile, eight more are at the pre-contract stage as follows:

(a) Upgrading of Nyabau Water Treatment Plant from its current capacity of 354 million litres of water per day to 554 million litres of water per day, which is now at the design stage; (b) Upgrading of Samalaju Water Treatment Plant from a capacity of 80 million litres of water per day to 160 million litres of water per day, which is now at the design stage; (c) New Samalaju Water Treatment Plant with a capacity of 120 million litres of water per day, which is now at the design stage; (d) New Beluru Water Treatment Plant with a capacity of 75 million litres of water per day, which is now at the design stage; (e) Upgrading of Suai Water Treatment Plant from 30 million litres of water per day to 50 million litres of water per day, which is now at the design stage; (f) Upgrading of Long Lama Water Treatment Plant from 2 million litres of water per day to 12 million litres of water per day, which is now at the design stage; (g) New Trusan Water Treatment Plant with a capacity of 50 million litres of water per day, which is currently at the tender evaluation stage; and (h) New Lawas Water Treatment Plant with a capacity of 20 million litres of water per day, which is currently at the tender stage.

Mr Speaker, as for the water supply grid pipelines, 23 km of water grid pipeline has been completed, while another 596 km of water grid pipeline is being and will be implemented to connect the whole of the Northern Region.

For the information of the Members of this august House, overall, nine major water treatment plants have been completed. Meanwhile, an estimated 540 km of water grid pipeline has been completed, connecting areas as follows:

(a) Matang – Samariang, estimated at 35 km; (b) Kuching – Bau–Lundu, estimated at 108 km; (c) Kuching – Kota Samarahan–Asajaya–Sebuyau–Simunjan, estimated at 133 km; (d) Saratok – Kabong, estimated at 55 km; (e) Sarikei – Bintangor–Tanjung Manis–Pulau Bruit, estimated at 186 km; and (f) Trusan – Sundar, estimated at 23 km.

When the Sarawak Water Supply Master Plan and Water Grid System is fully completed, the water supply in Sarawak will become more stable and sufficient to meet the demand of consumers in Sarawak. Meanwhile, off-grid areas will be supplied with water through the Sarawak Alternative Water Supply system, or SAWAS in short. For the information of Members of this august House, overall, the total capacity of water treatment plants in Sarawak is now sufficient for water demand, namely 2,173 million litres of water. This means we have the capacity to meet demand across the whole of Sarawak.

For the information of the Members of this august House, addressing water supply issues in Sarawak is not an overnight solution, as many of these water issues and challenges are inherited and accumulated over the years. But we are actively fixing it now. We are on the right track.

As the Members of this august House are aware, the Sarawak Government has implemented water supply projects aggressively, using the Sarawak Government's own allocation of RM4.6 billion under the Twelfth Malaysia Plan (RMK-12) and Alternative Funding to implement water supply projects in line with the Sarawak Water Supply Master Plan and Water Grid System. At the same time, the Sarawak Government has also approved an allocation of RM1.1 billion to upgrade and replace dilapidated pipes totalling 2,740 km across Sarawak, starting from last year over a period of five years. Perhaps I can also share here, earlier I spoke about SAWAS, where at the moment, 79 I can touch on SAWAS, never mind.

Mr Speaker, this demonstrates the concern of the Sarawak Government in providing a large allocation to tackle the water supply problems faced by the people. The ministry and water supply agencies are always striving to implement all projects that have been planned and approved according to the set schedule. I call on us to join hands and work together to realise the plans that have been made.

Mr Speaker,

Sarawak Alternative Water Supply (SAWAS)

Sarawak Alternative Water Supply (SAWAS) is an off-grid initiative that provides clean water supply to residents in interior areas that cannot be connected to our existing water grid system. So far, SAWAS has benefited approximately 2,600 households in 79 villages and longhouses. It is estimated that another 1,300 villages and longhouses in interior areas will benefit from water supply through SAWAS.

The 79 villages and longhouses that I mentioned earlier that receive water supply through the SAWAS system are as follows:

(a) In Kuching Division, there are seven villages and longhouses; (b) In Samarahan Division – 15; (c) In Sri Aman Division – three; (d) In Sarikei Division – three; (e) In Sibu Division – two; (f) In Bintulu Division – 21; (g) In Mukah Division – 13; (h) In Kapit Division – seven; (i) In Miri Division – five; and (j) In Limbang Division – three.

Meanwhile, the estimated 1,300 villages and longhouses that I mentioned earlier will cover areas such as:

(a) In Sri Aman Division – 184; (b) In Sarikei Division – 151; (c) In Sibu Division – 8; (d) In Mukah Division – 23; (e) In Bintulu Division – 250; (f) In Kapit Division – 474; (g) In Miri Division – 160; and (h) In Limbang Division – 50.

As one of the initiatives to expedite the implementation of water supply projects in Sarawak, my ministry is exploring one method of implementing water supply projects through the Private Finance Initiative (PFI) for the implementation of the Non-Revenue Water (NRW) programme and the Sarawak Alternative Water Supply (SAWAS) in rural areas. We are exploring PFI right now.

My ministry, together with the State Financial Secretary's Office and water supply agencies, is currently studying the implementation method that I mentioned earlier.

Mr Speaker,

Acute Water Treatment Plant Initiative

While awaiting the completion of major water treatment plants planned under the Sarawak Water Supply Master Plan, my ministry, through the Sarawak Rural Water Supply Department (JBALB), has implemented the Acute Water Treatment Plant initiative as a transitional measure before the completion of the water grid to cater for water shortages in critical areas.

So far, 16 Acute Water Treatment Plants have been operational, providing an additional capacity of 91 million litres of water per day (JLH) to the existing capacity of water treatment plants, and they are located at the following places:

(a) Sematan; (b) Lundu; (c) Sungai Serin Serian; (d) Lingga; (e) Maludam – 1; (f) Maludam – 2 (for Beladin); (g) Pusa; (h) Spaoh; (i) Lubau; (j) Lichok; (k) Temadak; (l) Kanowit; (m) Sg Sadit, Sibu; (n) Daro; (o) Long Lama; and (p) Song. Song town, which we officiated recently.

All the areas facing critical water supply issues as I mentioned earlier have received a stable and sufficient water supply.

My ministry is also currently and will be implementing another eight Acute Water Treatment Plants in Puncak Borneo, Sebangan, Sebuyau, Pantu, Balai Ringin, Nibong Tada, Rantau Panjang and Suai to address water shortages in those areas.

Mr Speaker,

Programme for Upgrading and Replacing Old/Dilapidated Pipes

In an effort to improve the pipe network and reduce the Non-Revenue Water (NRW) rate in Sarawak, the Sarawak Government is actively implementing a programme to upgrade and replace old and dilapidated pipes totalling 2,740 km, involving an allocation of RM1.1 billion as I mentioned earlier.

For the information of this august House, 23 projects that have been completed cover the replacement of old and dilapidated water pipes totalling 52.8 kilometres, while 33 projects that are under construction cover the replacement of old and dilapidated pipes totalling 200.7 kilometres. A total of RM144 million has been allocated for the replacement of old and dilapidated pipes totalling 253.5 kilometres.

Of these 253.5 kilometres of old and dilapidated pipe replacement, 73.8 kilometres are being implemented by JBALB for rural areas, 130.3 kilometres in the Central Region and 49.4 kilometres in the Northern Region, each implemented by Sarawak Water.

For the remaining 140 projects as I mentioned earlier, these projects will commence next year:

(a) 111 projects will be implemented by JBALB in rural areas; and (b) 29 projects will be implemented by Sarawak Water, involving 12 projects in the Southern Region, three projects in the Central Region and 14 projects in the Northern Region.

So far, Mr Speaker, 23 projects are at the pre-contract stage. The programme to upgrade and replace pipes involving an allocation of RM1.1 billion, as I mentioned earlier, is an allocation from the Sarawak Government itself, and is now being implemented in phases over a five-year period. My ministry is targeting at least another 140 projects to begin construction next year.

Establishment of One Entity for Sarawak Water Supply

For the information of the Members of this august House, the consolidation; now touching on the establishment of one entity, Mr Speaker, namely Sarawak Water. For the information of the Members of this august House, the merger of the three water entities in Sarawak into Sarawak Water Sdn. Bhd. (Sarawak Water) is a historic milestone that was launched and officiated by the Honourable Premier of Sarawak on 26 August 2025.

LAKU Management Sdn. Bhd. was used as the platform to merge the three entities because it was already an established corporate vehicle operating under the Companies Act 2016, making it the most practical and efficient platform. The name of LAKU was subsequently changed to Sarawak Water on 26th December 2024. Staff of Kuching Water Board (KWB) and Sibu Water Board (SWB) were offered the opportunity to join Sarawak Water, and upon receiving their acceptance, the staff and operations of Kuching Water Board and Sibu Water Board were formally absorbed into Sarawak Water on 1st August 2025.

This merger marks a new beginning in the Sarawak Government's efforts to ensure professional and integrated water services across the towns and some rural areas of Sarawak.

At the early phase of this restructuring, my ministry together with Sarawak Water is refining and streamlining the operation of Sarawak Water in a phased manner to ensure the transition process runs in an orderly and smooth manner.

At the time of the merger, 97% of all staff of the Kuching Water Board (KWB) and Sibu Water Board (SWB) have officially agreed to join Sarawak Water, while the remaining 3% chose to continue serving in the Sarawak Public Service. The total number of staff after the merger of the three entities, namely LAKU Management Sdn Bhd, Kuching Water Board (KWB) and Sibu Water Board (SWB), now known as Sarawak Water, is 1,214 persons.

Meanwhile, the Sarawak Rural Water Supply Department (JBALB) will be retained as the Sarawak Government agency responsible for managing the development of water supply infrastructure, particularly for rural areas.

I also take this opportunity to thank the Federal Government for recognising the Sarawak Rural Water Supply Department (JBALB) as a technical department, as well as the Sarawak Public Works Department (JKR) and the Sarawak Irrigation and Drainage Department (DID), on 28 August last. Thank you very much, Federal Government for recognizing JBALB as a technical department.

This recognition carries great significance because it empowers JBALB to act as the implementing agency for Federal Government procurement, covering the appointment of consultants, the calling and evaluation of tenders, and the award of contracts for Federal Government physical development projects valued up to RM50 million. That means RM50 billion and below. With this delegation of authority, the implementation of projects under the Ministry of Rural and Regional Development (KKDW) can be expedited because the pre-contract process is now carried out by JBALB. Unfortunately, this is only relevant for the new projects approved later on; whatever has been approved earlier on will still be handled by KKDW itself. How I wish all the projects approved earlier on are also handled by JBALB especially those below RM50 million.

Electricity Supply

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

Mr Speaker, now I move on to the development of electricity supply in Sarawak.

Sarawak Electricity Generation and Demand

For the information of the Honourable Members of this august House, the electricity generation capacity in Sarawak is 5,898 megawatts, compared with the latest electricity supply demand of 4,712 megawatts. This generation capacity shows that our generation is sufficient to meet domestic needs, including electricity supply in rural areas.

The latest electricity generation capacity mix (generation capacity mix) includes renewable energy sources, namely 60% (3,558 megawatts) from hydro sources and 1% (50 megawatts) from solar sources. The remainder comprises fuel energy, namely 22% (1,296 megawatts) from gas sources, 15% (891 megawatts) from coal sources and 2% (103 megawatts) from diesel sources.

Sarawak targets an electricity supply capacity of 10,000 megawatts, I repeat; Sarawak targets an electricity generation capacity of 10,000 megawatts (10 GW) by 2030 and 15,000 megawatts (15 GW) by 2035, with at least 60% of the capacity mix from renewable energy sources such as Hydropower, Solar, Cascading Power Sources (CPS), Pumped Storage Hydropower (PSH) and Biomass.

Rural Electricity Supply (BELB)

Mr Speaker, the Sarawak Government has allocated RM2.49 billion under the Twelfth Malaysia Plan (RMK-12) and Alternative Funding to improve rural electricity coverage, involving 214 projects. Of this total, 179 projects (83.6%) have been fully completed, benefiting 59,698 households, while the remaining 35 projects (16.4%) are at various stages of implementation.

In addition, the Sarawak Government has also approved an allocation of RM46 million for the year 2026 to continue the implementation of projects such as ALAF, the SARES grid connection, battery replacement and electricity supply upgrading. Now I would like to touch on Rural Electricity Supply Coverage. Rural Electricity Supply Coverage

Mr Speaker, Sarawak is now close to achieving full coverage of rural electricity supply. However, Mr Speaker, there are several areas where electricity infrastructure projects have not yet been able to be implemented due to the following constraints:

(a) waiting for the completion of road construction before distribution lines can be built; (b) waiting for the completion of new resettlement before electricity supply projects can proceed; and (c) waiting for the resolution of wayleave issues before construction of distribution lines can be carried out.

Therefore, my ministry will continue to work with the relevant ministries, departments and agencies, as well as local communities, to ensure that the implementation of electricity supply infrastructure, especially in rural areas, proceeds smoothly.

Additional and Late Applicant Fund (ALAF)

The Sarawak Government has allocated RM315 million, 315 million, to implement ALAF projects from Phase 1 to Phase 4, involving 21,073 households. A total of 20,065 households, or 95.2%, have been completed, while the remainder are at various stages of implementation. To continue the ALAF Phase 5 project, the Sarawak Government has approved an additional allocation of RM126 million to supply electricity to an estimated 5,800 new applications across Sarawak. So, the Sarawak Government is very concern. That's why I think here we are approving another RM126 millions to implement Phase 5 and that will benefit at least 5,800 applications we have received to date.

Improvement of Electricity Supply System Quality

Mr Speaker, to ensure reliable electricity supply quality, especially in rural areas, my ministry, through the implementing agency Sarawak Energy and its subsidiary SESCO, is actively strengthening the performance of the supply system in stages through improvements such as the following:

(a) construction of distribution lines using Medium Voltage Covered Conductor (MVCC) technology; (b) construction of Double Circuit Monopole overhead lines; (c) construction of new 33/11kV substations; and (d) upgrading of transformers.

To date, a total of 273 km of major MVCC distribution line projects have been completed across Sarawak, compared with 244 km as informed at the previous sitting of this honourable House, and these are as follows:

(a) Petian to Dalat (36 km); (b) Kanowit to Nanga Ngungun (34 km); (c) Kanowit to Julau (35 km); (d) Murum Junction to Belaga (59 km); (e) Tatau to Sangan (28 km); (f) Similajau to Sebauh (52 km); and (g) Bunut to Long Lama (29 km).

For the information of this honourable House, the Sarawak Government has approved an allocation of RM150 million to upgrade electricity supply infrastructure in the Samarahan Division. The project, launched on 23 November 2025 last by the Honourable Premier of Sarawak, recently at Dewan Kampung Sampat Sebangan, Sebuyau, will improve electricity performance for distribution lines in the districts of Samarahan, Asajaya, Sebuyau, Simunjan and Gedong. Work began as soon as this project was launched on 23 November last.

The main scope of this project covers:

(a) MVCC line from Asajaya to Batang Sadong Bridge, estimated at 22.5 km, expected to be completed in the first quarter of 2028; (b) cable across the Batang Sadong River, estimated at 1.8 km, expected to be completed in the fourth quarter of 2028; (c) MVCC line from Batang Sadong Bridge to Sebuyau, estimated at 44.3 km, expected to be completed in the fourth quarter of 2028; (d) MVCC line from Batang Sadong Bridge towards Simunjan, estimated at 26.4 km, expected to be completed in the third quarter of 2028; and (e) MVCC line from Batang Sadong Bridge to Gedong, estimated at 39.2 km, expected to be completed in the fourth quarter of 2028.

Apart from the upgrading projects in the Samarahan Division, the Sarawak Government has also approved an allocation of RM425 million to upgrade infrastructure and electricity supply in Lundu, Lubok Antu, the Betong Division, Sungai Asap and Lawas under the Thirteenth Malaysia Plan (RMK-13).

Apart from the very substantial allocation from the Sarawak Government, Sarawak Energy has also spent RM10.2 billion from 2020 to 2025 on the construction of electricity substations, distribution lines, transmission, and on increasing capacity and improving existing electricity supply systems.

Mr Speaker, now I would like to touch on the Sarawak grid transmission system.

Sarawak Grid Transmission System (Sarawak Grid Transmission System)

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

The 500kV transmission line from Bunut to Similajau was completed in August 2025. This completes the 500kV grid system from the northern region, namely from Bunut, Miri and Similajau, Bintulu, to the central region, Mapai, Sibu, and onward to the Southern Region at Tondong, Bau. The entire 500kV grid system project cost RM3.4 billion. At present, this transmission line operates at 275kV and will be upgraded to 500kV when the Baleh Hydroelectric Power Station begins operation in the fourth quarter of 2029.

The 275kV transmission line project from Bunut to Lawas has been energised since the third week of November 2025, and transmission to Sabah will begin operating in mid-December this year. I also have good news to convey to the residents of Lawas. Starting 4 December this year, Lawas will no longer need to depend on power stations or gensets, as the electricity supply system for the Lawas district will be connected directly to the Sarawak Main Grid System. Congratulations Lawas, because all this while, Lawas is always supply via genset.

Meanwhile, the connection from Limbang to the Sarawak Main Grid Station is currently under construction and at 90% progress, and is expected to be fully completed in mid-2026. Upon completion, these projects, comprising five substations and six transmission lines of 579 km at a cost of RM2.8 billion, will significantly improve the reliability of power supply in the Lawas and Limbang districts, which is the main Limbang division. So, Limbang district will get it a bit later because now it is still yet to be completed.

Mr Speaker, Sarawak Energy is also implementing the 275kV Kuching Network Reinforcement (KNR) transmission line project to improve the transmission system and accommodate the increase in consumer demand in the Kuching Division. The 275kV Kuching Network Reinforcement (KNR) Phase One, connecting Entingan in Samarahan to Tanjung Bako, which began in December 2023, is targeted for completion in the fourth quarter of 2027.

Meanwhile, the 275kV Kuching Network Reinforcement (KNR) Phase Two, connecting Tanjong Bako, Demak Laut, Santubong and Matang, is currently at the feasibility study stage and is scheduled for completion in the first quarter of 2027. This project is estimated to cost RM2.4 billion, and construction is scheduled to begin in the fourth quarter of 2028.

Now, I touch on Generation from Renewable Energy.

Generation from Renewable Energy (Generation From Renewable Energy)

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

Several additional generation from renewable energy sources (additional generation from renewable energy) have the potential to be developed, such as hydropower, solar, Cascading Power Sources (CPS), Pumped Storage Hydropower (PSH) and Biomass. To date, a feasibility study for the development of floating solar is being carried out at the Bengoh, Batang Ai, Bakun and Murum dams. Meanwhile, the development of ground mounted solar is under study at several locations in Gedong, Selangau, Bintulu, Samalaju, Baram and Miri.

Sarawak Energy has signed four Power Purchase Agreements (PPA) for ground mounted solar systems to be implemented in Kuching, Mukah, Tanjung Manis and Bintulu, each with a capacity of 100 megawatts. These Power Purchase Agreements (PPA) reflect the continuous commitment of the Sarawak Government, through the implementing agency Sarawak Energy, to expand investment in the renewable energy sector.

Now I would like to touch on the Net Energy Metering Scheme, in short NEM, and the Grid-Connected Rooftop Solar Photovoltaic Installation for Self-Consumption (SELCO).

Net Energy Metering (NEM) Scheme and Grid-Connected Rooftop Solar Photovoltaic Installation for Self-Consumption (SELCO)

The Net Energy Metering Scheme, or NEM in short, is an energy offset scheme, whereby surplus generation from solar will be channelled to the main grid and can thus reduce consumers' electricity bills. To date, a total of 35 NEM solar photovoltaic (PV) systems with a capacity of 867 kiloWatt-peak (kWp) have been operating, compared with 16 systems at the end of 2024. The Net Energy Metering (NEM) Scheme and Grid-Connected Rooftop Solar Photovoltaic Installation for Self-Consumption. To date, NEM installations are as follows:

(a) 22 installations in the Kuching Division, with a total capacity of 700 kiloWatt-peak (kWp); (b) Three installations in the Sibu Division, with a total capacity of 42 kiloWatt-peak (kWp); (c) Five installations in the Bintulu Division, with a total capacity of 45 kiloWatt-peak (kWp); and (d) Five installations in the Miri Division, with a total capacity of 70 kiloWatt-peak (kWp).

To encourage participation of domestic consumers in the NEM scheme, the Sarawak Government, through the implementing agency Sarawak Energy, has allocated a subsidy of RM11.24 million to help reduce the initial cost of installing rooftop solar photovoltaic (PV) systems in residential homes. The estimated installation cost is between RM15,000 and RM20,000 for a system with a capacity of 4 kiloWatt-peak (kWp). So, anybody interested in the subsidy especially your constituent, please, approach our Sarawak Energy counter, because this is the fund provided by the Sarawak Government.

Every residential landed property that is not equipped with a rooftop solar PV system is eligible to receive a subsidy of between RM8,000 and RM12,000, depending on the size of the rooftop solar PV system installed. The allocation will be given on a first come, first served basis to homeowners who install such systems between 1 January 2025 and 31 December 2026. So, you have space of one year to apply through our Sarawak Energy, our implementing agency. Applications for this subsidy can be made at the Sarawak Energy counter or online starting January 2026. So, you can submit your application online as well starting from January 2026.

Apart from the NEM scheme, the Grid-Connected Rooftop Solar Photovoltaic Installation for Self-Consumption (SELCO) is electricity generation from solar systems for private use. To date, one SELCO system has been operating in the Sama Jaya industrial area with a capacity of 600 kiloWatt-peak (kWp). Ya, we have one already operating in Sama Jaya. 12 SELCO applications with a total capacity of 11,629 kiloWatt-peak (kWp) are currently at various stages of implementation.

Next, I would like to touch on Electricity Export.

Electricity Exports

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

Cross-border electricity export to realise the goals of the Borneo Power Grid (BPG) and the ASEAN Power Grid (APG) continues to be intensified to position Sarawak as the Battery of ASEAN. Sarawak has exported approximately 100 megawatts of energy to West Kalimantan since 2016 and will begin exporting electricity supply with a capacity of 30 megawatts to Sabah in December this year.

For the information of the Honourable Members of this august House, the Government of Brunei Darussalam signed a Memorandum of Understanding (MoU) with the Sarawak Government on energy cooperation on 3 September last. The Government of Brunei and the Sarawak Government are in the process of negotiating a Power Exchange Agreement (PEA) for interconnection of electricity supply. Meanwhile, the electricity export project to Singapore and Peninsular Malaysia is currently at the stage of engagement sessions with government agencies involved in the project in Peninsular Malaysia, Malaysia, Singapore, and Indonesia.

For the information of all Honourable Members of this august House, the Energy Market Authority (EMA) of Singapore issued conditional approval for the electricity supply interconnection project to Singapore on 17 October last. Hence, this project has passed the preliminary assessment stage as well as the feasibility study from the technical and commercial aspects.

Gas Distribution

Dato Sri Haji Julaihi bin Haji NarawiPBB · GPSMinister of Utilities and Telecommunications · SebuyauEN

Sekarang, saya ingin menyentuh tentang satu lagi aspek yang dikendalikan oleh kementerian saya, iaitu pengedaran gas. Seterusnya, saya akan menyentuh berkenaan dengan pengedaran gas.

Kawal Selia Distribution of Gas Ordinance, 2016 (DGO 2016) di Sarawak

As the honourable Members of this August House are aware, Petroleum Sarawak Berhad (PETROS) was appointed as the sole gas aggregator with effect from 1 February 2024 to carry out activities relating to the procurement, supply, distribution and sale of natural gas in Sarawak. The gas aggregator is also responsible for planning, developing, operating and maintaining the natural gas distribution network system in Sarawak. On 21 May 2025, the Most Honourable Prime Minister and the Most Honourable Premier of Sarawak signed a joint declaration stating that all Federal and Sarawak laws relating to gas distribution must coexist and be respected by all parties, including PETROS and PETRONAS. I have the opportunity to witness the Joint Declaration on the 21st May 2025, Mr Speaker.

However, Sarawak through PETROS is still refining negotiations with PETRONAS to finalise a commercial agreement no later than 31 December 2025. It is our hope that this agreement can be finalised for the common good, especially in Sarawak's efforts to implement the Sarawak Gas Roadmap (SGR). We believe PETRONAS can play an important role together with PETROS to make the Sarawak Gas Roadmap a success. Maju Sarawak, majulah Malaysia. [Sarawak progresses, let Malaysia progress.]

Mr Speaker, nevertheless, I am also puzzled that for several weeks now, PETRONAS has announced a new cooperation agreement with international partners from Italy and France. However, until now they still do not show the same priority or determination to finalise the long-delayed agreement with PETROS, which is the entity entrusted to represent Sarawak's interests.

This situation illustrates, yes, I hope it does not illustrate. This situation illustrates what the Malay proverb says: "The monkey in the forest is suckled, while the child at home goes hungry." It is like prioritising foreign partners while neglecting responsibilities towards Sarawak, which have long been postponed. Sarawak remains committed to negotiating professionally and collaboratively, but hopes that the spirit of cooperation that has been agreed upon will not remain merely a document, but will be translated into swift action by all concerned parties.

Mr Speaker, in Sarawak, the regulation of gas distribution and related activities is subject to the DGO 2016, which functions equivalently to the Gas Supply Act, 1993, a federal law that does not apply in Sarawak. Therefore, all parties carrying out activities related to the distribution and supply of gas must apply for a licence under Section 7, DGO 2016. Failure to comply with these licensing requirements is an offence under Section 20 (Criminal Case) or Section 21A (Civil Claim) of the said Ordinance, which may be subject to a fine or imprisonment or both.

So far, the number of licences issued for each activity under Section 7, DGO 2016 is as follows:

(a) Three licences were issued for Import of Any Gas for Regasification Processing Treatment, Separation, Utilization or Distribution in Sarawak; (b) One licence for Treatment, Separation of Processing of Gas; (c) 18 licences for Transportation of Gas; (d) Seven licences for Building, Managing or Maintaining Gas Pipeline or Other Apparatus or Equipment or Mechanism for the Distribution of Gas; (e) 14 licences for Supply of Gas; and (f) 436 licences for Retail of Gas.

For the information of this honourable House, on 16 August 2025, my ministry issued Financial Penalty Notices to entities operating without a licence as an enforcement measure and to ensure full compliance with the DGO 2016. My ministry wishes to emphasise that any upstream gas players carrying out activities under Section 7, DGO 2016 must sign a Gas Purchase Agreement (GPA) together with PETROS. A copy of this agreement must be submitted to my ministry for the purpose of licence applications and renewals. So far, a total of 14 upstream gas players have been granted Retail of Gas licences under Section 7(g), DGO 2016.

Sarawak Gas Roadmap

My ministry, through PETROS, is actively carrying out continuous efforts to increase the use of natural gas in Sarawak in line with the Sarawak Gas Roadmap. The Sarawak Gas Roadmap plan covers four strategic hubs, namely in Miri, Samalaju, Bintulu and Kuching, through several initiatives as follows:

(a) The 500 MW Combined Cycle Gas Turbine (CCGT) project in Miri, which has now reached 30% progress and is expected to begin commercial operation in the fourth quarter of 2027; (b) The 65 km Kidurong–Samalaju Gas Pipeline project, which will supply natural gas of 300 million standard cubic feet per day, is now 91% complete and is expected to operate in the second quarter of 2026; (c) The Gas to Bintulu Pilot Project, which began operating in July 2025, supplies piped natural gas to 40 low-income households in Sungai Plan, Bintulu. This is the first step in bringing local gas resources to local communities and was officiated by the Most Honourable Premier and I have the opportunity to witness the program as well, Mr Speaker; (d) The Gas Direct to Kitchen initiative by PETROS enables access to piped natural gas directly to residences in Quadruplex Taman Ceria, Miri. So far, 589 households have been connected to piped gas and the rest will be connected in phases. This project is expected to be fully completed in the fourth quarter of 2027. So, this shows how concern Sarawak through PETROS is, Mr Speaker, Sir; (e) The Sarawak Virtual Pipeline System (VPS) project, which will supply Liquefied Natural Gas (LNG) from Bintulu to Kuching and is expected to operate in the first quarter of 2026, will also expand gas access to areas outside the grid, increase domestic gas use and support the development of local industries; and (f) The Kuching Low-Carbon Hub (KLCH) project, which will develop a regasification terminal, a low-carbon petrochemical park, gas infrastructure and the construction of a CCGT in Kuching with a capacity of 5,000 MW, which is equivalent to 5GW.

All these initiatives are part of the Sarawak Gas Roadmap plan, which aims to increase the utilisation of existing domestic gas from 7% to at least 30% by 2030. Why do I say 7%? Previously it was 6%, but it increased to 7% because of the consumption of gas at PETCHEM, Bintulu. Meaning that, we have increased from 6% to 7%, but ultimately our target is that we must utilise gas domestically up to 30% in the near future. And that 1%, Mr Speaker, if I may share here, has created many employment opportunities from top to the lowest level. So, this is the impact of utilising gas domestically in Sarawak itself.

Adequate LPG Supply Assurance in Sarawak

Mr Speaker, so far PETROSNiaga, I now touch on the assurance of adequate LPG supply in Sarawak. Since December 2023, PETROSNiaga Sdn. Bhd., which is a local company owned by PETROS (51%) and PETRONAS Dagangan Berhad (49%), has been the sole distributor of subsidised LPG in Sarawak. So, this again shows how PETROS and PETRONAS can work together effectively because PETROSNiaga is owned both by PETROS and PETRONAS.

Mr Speaker, as the honourable Members of this House are aware, an incident occurred on 29 January 2025 that affected the operation of the LPG cylinder filling plant in Bintulu. The Sarawak Government, through PETROSNiaga, took appropriate steps and succeeded in ensuring that LPG supply remained stable in Sarawak.

So far, PETROSNiaga has two bottling plants as follows.

First, the IOT Senari Kuching Plant, which records an average production of 16,000 cylinder units per day, 16,000 units, which is 16,000 cylinders per day.

Second, the Pusaka Bintulu Temporary Plant, which records an average production of 10,000 units per day. This is temporary to replace the Bottling Plant that was damaged due to a landslide in January last year. For the information of this honourable House, the daily demand for LPG is around 25,000 cylinders every day. There are currently about 1.8 million subsidised PETROS LPG cylinders, the red ones, available in the market throughout Sarawak. Meaning to say that, now the demand is about 25,000 cylinders per day and in circulation, there are 1.8 million cylinders in circulation right now, the red ones. So, it is more than sufficient to meet the demand as long as nobody does the stocking or holding of the gas cylinders.

The stipulated price of LPG is RM26.60 per cylinder for self-collection from authorised distributors registered with PETROSNiaga. At present, there are 67 registered distributors and more than 300 sub-distributors throughout Sarawak. So, it is more than sufficient to meet the total demand in Sarawak.

Strategic Cooperation in the Regulation of Gas and Electrical Equipment with the Energy Commission of Sabah and SIRIM

Mr Speaker, the Sarawak Government, through the Ministry of Utilities and Telecommunications (Kementerian Utiliti dan Telekomunikasi), has signed Memoranda of Understanding (MoU) with the Energy Commission of Sabah (ECoS) and SIRIM. The MoU with ECoS was signed on 22 April 2025 with the aim of harmonising the regulation of gas and electrical equipment in Sarawak and Sabah. Through this MoU, products already approved by ECoS Sabah do not need to be re-tested in Sarawak. This will thereby facilitate the process of bringing such gas and electrical equipment from Sabah into Sarawak and vice versa.

My ministry also signed an MoU with SIRIM on 30 October 2025, which focuses on certification, inspection and testing of gas and electrical equipment. This MoU also introduces the use of safety labels with QR code features to make it easier for consumers to verify the authenticity of gas and electrical equipment. Both MoUs are expected to enhance consumer safety and strengthen energy efficiency for gas and electrical equipment in Sarawak.

Telecommunications

Mr Speaker, next, I would like to touch on the latest developments in telecommunications coverage in Sarawak. So far, Sarawak has 4,696 tower structures, including telecommunication structures on top of buildings, that have been fully operational. Internet service coverage based on residential areas has reached 94.5%, compared with 90.2% as I reported at the previous sitting of this honourable House.

Sarawak Linking Urban, Rural and Nation (SALURAN)

Mr Speaker, now I would like to touch on Sarawak Linking Urban, Rural and Nation (SALURAN). As the honourable Members of this House are aware, the provision of internet coverage is under the responsibility of the Federal Government, but the Sarawak Government has taken an intervention step by allocating RM2.3 billion under the Sarawak Linking Urban, Rural and Nation (SALURAN) initiative to accelerate the expansion of internet coverage throughout Sarawak, particularly in rural areas.

The main component of the SALURAN initiative is the Sarawak Multimedia Authority Rural Telecommunication (SMART) project, implemented by Sarawak Digital Economy Corporation Berhad (SDEC). This project involves the construction of 618 new telecommunication towers, including 18 repeater towers.

Today, I am delighted to announce that all 600 SMART towers are now operational with MySRBN internet service, of which 510 towers also provide 4G services. All these towers are expected to be fully operational with 4G services by the end of this month. This is the commitment that the Sarawak Government has made through SDEC. And we should be happy because the target areas are the rural areas, which are represented by most of us in this August House.

This achievement signifies a major success in the Sarawak Government's efforts to support the Federal Government in enhancing connectivity in rural areas. This is a historic moment signifying the near end of a long, challenging and hopeful journey. This is not merely the completion of a project; this is a promise that we have finally kept. Behind every tower that stands are the hopes of parents who want their children to learn without falling behind, small traders who want to expand their livelihoods, and remote communities who have patiently waited to be connected to the outside world.

This achievement proves that when we are determined, no distance is too far and no path is too difficult. This is the gift of the Sarawak Government to its people, that in our motherland, every voice, every dream, and every life deserves to be connected, and this also proves the Sarawak Government's commitment to establishing close cooperation with the Federal Government, and we are looking forward to much better cooperation from our federal counterparts in the near future because Sarawak is doing it right now, Mr Speaker.

Development of the National Digital Connectivity Initiative (JENDELA)

For the National Digital Connectivity Initiative (JENDELA) under the Federal Government through the Malaysian Communications and Multimedia Commission (MCMC), all 636 JENDELA Phase 1 towers have been completed and are operational with 4G services. This too is complete, this is a blessing for our rural areas. In addition, Mr Speaker, MCMC will also continue the initiative to expand internet coverage through the implementation of JENDELA Phase 2, particularly in rural areas, which is expected to begin in the first quarter of 2026. This initiative is also designed to address service quality issues so that the level of user experience becomes more stable. So, we are looking forward to the implementation of JENDELA Phase 2 in the first quarter of 2026 because I believe there are areas still having blind spots, so we are looking forward to this implementation of JENDELA 2, which I cannot disclose to you, but I think the quantity offered to Sarawak is quite good.

Implementation of 5G

For the information of this honourable House, all 576 first 5G network sites operated by Digital Nasional Berhad (DNB) have become operational with 5G coverage of populated areas (Coverage of Populated Area, COPA) of 63.8%. Meanwhile, the second 5G network operated by U-Mobile was implemented starting June 2025. So far, a total of 233 out of 384 of these second 5G network sites have been completed, of which 48 have begun operating, beaming on air.

Improvement of Quality of Service (QoS)

For the information of this honourable House, MCMC continues to focus on improving the Quality of Service (QoS), in line with the increasing coverage needs and the public's demand for more stable telecommunication services. The implementation of network audits and periodic tests is carried out continuously to ensure that service providers comply with the stipulated standard specifications. Areas identified as having coverage or performance issues will be given priority for immediate rectification, whether through network improvements or upgrading of existing infrastructure. Until October 2025, MCMC has carried out network audit activities and found a total of 321 locations identified as having coverage or performance issues below standard limits, which have been improved by the service providers.

Fibre Infrastructure Improvement Initiative

For the information of this honourable House, SACOFA is implementing an initiative to improve the existing SACOFA network, which involves upgrading fibre optic networks, increasing network capacity and strengthening supporting infrastructure. This initiative, which began in October last year, is expected to be completed within a period of 20 months. This initiative aims to enhance backhaul capacity (rangkaian penghubung balik), backhaul meaning the return link network, for service providers such as CelcomDigi, Maxis, U-Mobile and others, in order to reduce network congestion and provide more stable internet connection quality for service providers.

Development of the Undersea Fibre Optic Cable System under the MADANI Undersea Cable Connection (SALAM)

Next, I would like to touch on the Development of the Undersea Fibre Optic Cable System under the MADANI Undersea Cable Connection (SALAM). The Development of the Undersea Fibre Optic Cable System under the MADANI Undersea Cable Connection (SALAM) initiative, in short, as announced by the Most Honourable Prime Minister in the tabling of the 2026 Federal Government Budget last time, is a strategic project that will strengthen the nation's digital infrastructure. The SALAM initiative involves the construction of undersea fibre optic cable with an estimated length of 3,190 km connecting Peninsular Malaysia to Sarawak and Sabah. Accordingly, I call on the Federal Government to consider the participation of local Sarawak telecommunications companies in the implementation of this project in the future. So, we are appealing to the Federal Government, please consider the participation of local Sarawak companies when implementing SALAM in the near future.

MySRBN Internet Plan

Next, the MySRBN Internet Plan. For the information of this honourable House, since the launch of the MySRBN Prepaid Plan, a total of 37,000 households have enjoyed MySRBN services, compared with 31,000 households in May last year, an increase of 6,000 households. My ministry, through SDEC, will continue to implement this community programme throughout Sarawak to encourage subscription to the service so that it becomes more widespread.

To further add to the MySRBN service options, SDEC has introduced MySRBN XL, the first high-speed home fibre prepaid service in Malaysia. This service is created to enable rural residents to enjoy high-speed internet access of up to 100 megabits per second (Mbps), by utilising the Point-of-Presence (PoP) fibre infrastructure provided by Borneo Restu Sdn. Bhd., a local Sarawak company.

With MySRBN XL, users are not tied to a monthly bill and only pay when they need it. This prepaid plan starts from as low as RM25, making it an affordable and flexible plan for everyone.

In addition, Mr Speaker, all new users will enjoy free usage for the first month as well as promotional rates for the following five months. At this time, a total of 3,300 premises have subscribed to MySRBN XL services available in 272 areas throughout Sarawak.

Integration of SarawakPass with MyDigital ID

With pleasure, I would like to inform the House that Sarawak has achieved an important milestone through the signing of a Memorandum of Understanding (MoU) between the Sarawak Government and the National Cyber Security Agency (NACSA), representing the Federal Government, last Friday, which was 28 November 2025. Through the integration of SarawakPass, which has 1.8 million registered users, with MyDigital ID, we have created a comprehensive digital ecosystem in line with the aspirations of PCDS 2030. This is to enhance digital inclusiveness and strengthen cybersecurity in the delivery of public services.

This is the spirit of Sarawak's unity for the welfare of Malaysia, extending from the South China Sea to the digital world. This proves the willingness and sacrifice of Sarawak in jointly strengthening the progress of the people of Malaysia. We are not merely ready, but stand as catalysts of digital innovation for the sake of the Malaysian nation that we love. So, this is the seriousness of Sarawak to contribute to the development of Malaysia as a whole, and I hope that this will be received with respect by our colleagues from the federal side.

International Digital Economy Conference Sarawak (IDECS 2025)

For the information of this honourable House, the International Digital Economy Conference Sarawak 2025 (IDECS25) was held from 22 to 23 October 2025 and successfully attracted the participation of 13,573 delegates from 28 countries, and involved 129 speakers who shared their expertise in the digital economy. In addition, a total of 22 Memoranda of Understanding (MoU) were signed between local and international companies, thereby strengthening strategic cooperation in Sarawak's digital ecosystem at the global level.

CHALLENGES

Vandalism

Now, Mr Speaker, I would like to touch on a matter that is close to all our hearts, vandalism as a challenge, yes. Cases of vandalism involving utility and telecommunication infrastructure facilities recorded a total of 2,458 cases in 2024, compared with 894 cases up to September of this year 2025, which shows a decrease of 64%. The total losses have also recorded a decrease of 36%, from RM7.34 million in 2024 to RM4.73 million this year. So, there is a sharp decrease in the incidence of vandalism when we look at the value and the number of cases from last year compared to this year.

Through the Anti-Vandalism Committee that has been established, my ministry, together with various departments and agencies of the Sarawak and Federal Governments, has also carried out various initiatives to combat vandalism against utility and telecommunication infrastructure. Among them are:

(a) Conducting regular integrated 'Ops Lusuh' operations at premises dealing in scrap goods together with the Royal Malaysia Police (PDRM), enforcement agencies, utilities and telecommunications throughout Sarawak; (b) Strengthening cooperation and community engagement through anti-vandalism awareness programmes, encouraging the public to report any suspicious activities at utility and telecommunication facilities; and (c) Taking legal action against any perpetrators of vandalism on utility and telecommunication facilities. So, this is one of the efforts that we must take at all times.

I call on the Honourable Members of this August House to extend cooperation to my ministry and take part in the Anti-Vandalism Prevention Campaign so that together we can curb the crime of vandalism that causes damage to the facilities needed by the people from time to time. I know all of you are very concerned, but I am looking forward to much, much more cooperation, so that we can really minimise cases or incidents of vandalism towards our utilities statewide.

Now I would like to respond to the specific issues raised by the Honourable Members. Specific Issues Regarding (Water Supply)

For the information of the Honourable Members for Meradong, Katibas, Batu Kitang, Balingian, Repok, Machan, Kalaka, Meluan, Kabong, Beting Maro and Batu Danau, my ministry, through the water supply agency, is always striving to expand coverage and address water supply problems faced by the people by implementing all projects planned and approved according to the timetable that has been set.

For the information of the Honourable Member for Bawang Assan and Bukit Assek, the proposals put forward by both Honourable Members regarding comprehensive improvement of the water supply system in the areas raised are part of my ministry's planning.

For the information of the Honourable Member for Engkilili, the area raised will receive clean and treated water supply as well as stable and sufficient water pressure upon the completion of the new Engkilili Water Treatment Plant, which has a capacity of 75 million litres of water per day, and upon the completion of the Water Supply Grid System in the Sri Aman Division. That should be able to solve your problem. Of course, not overnight, please, yes, it takes time.

For the information of the Honourable Member for Tebedu, we will conduct a study to consider a new water treatment plant in Tebedu, depending on sufficient raw water resources. Actually, we are trying to ascertain whether there is enough yield in the Tebedu area; we are evaluating the, what we call, this effort to put up a new treatment plant at Tebedu. In fact, besides Tebedu, if I may declare my interest, we are looking at Sebuyau as well. If the area has enough raw water intake, then we will consider putting up a new treatment plant. So, Tebedu is one of the areas; the other area is Sebuyau. Because we need a backup for the major treatment plant, especially in Serian and Samarahan Division.

For the information of the Honourable Member for Murum, consultants have been appointed to identify suitable water sources for the construction of a new water treatment plant in Sungai Asap. So, that is another area we are looking at, that is Sungai Asap. I hope the Honourable Member for Murum will be patient enough to wait for our efforts to identify the yield of the river in the area.

As for water supply projects under the Ministry of Rural and Regional Development (KKDW) as raised by the Honourable Members for Machan, Kalaka, Tamin and Kabong, all matters relating to the appointment of consultants, the management of value engineering, tender invitations, tender evaluation and contract awards are handled by KKDW. That is beyond our control.

For the information of the Honourable Member for Pending, the claim that Sarawak Water has not paid overtime "since August" is baffling, because overtime continues to be processed and paid as usual, and no staff has ever raised such an issue, so one wonders where exactly the Member for Pending obtained such information. Likewise, the allegation that contract staff were promised a 20% salary increase "has not reflected" in the new basic salary is simply untrue, making the source of this claim equally unclear.

For the information of the Honourable Member for Pending as well, regarding the issue of water tanker lorries that was raised, and which I read on TikTok, yes, during the incident of a pipe burst caused by a third party, KUTS at Sungai Stutong, Tabuan Jaya, Kuching, Sarawak Water's Southern Region supplied two large water tanker lorries with a capacity of 1,000 litres of water and two small water tanker lorries with a capacity of 5,000 litres of water. In addition, two more water tanker lorries from outside parties with a capacity of 5,000 litres were used for temporary supply during the incident. So, it is not true as alleged by the Member for Pending, and I have heard it on her TikTok. So, what it means is the Member for Pending might be counting only the lorries within her sight. Whatever she sees in front of her eyes, that is what she counts, without thinking that Kuching is big. So, some other lorries are operating elsewhere. So, please look beyond your sight, not within your sight only. So, you have to be fair when giving comments on our Sarawak Water in the Southern Region. For the information of the Honourable Member for Tebedu, we will conduct a study, enough, I'm done, enough, yes, enough. This is what I read just now, yes.

To the Honourable Members for Meradong, Katibas, Bawang Assan, Daro, Tellian, Kalaka, Engkilili, Tebedu, Krian, Batu Danau, Kabong and Beting Maro, I am very honoured by your words of appreciation, your appreciation of my ministry's achievements and of the water supply agencies, namely JBALB and Sarawak Water, in implementing water supply projects. I return my thanks. That is the duty that we strive for. These words will certainly spur us on to continue serving our beloved people. Thank you very much for your sincere appreciation.

As I stressed earlier, addressing water supply issues in Sarawak is not an overnight solution. We greatly appreciate the patience of the Honourable Members. We are now fixing it. We are on the right track, as I mentioned earlier.

Specific Issues (Electricity Supply)

For the information of the Honourable Members for Katibas, Tellian, Bukit Semuja, Meluan, Tamin, Krian, Batu Danau, Bukit Begunan and Kabong, as I have informed earlier, the implementation of the ALAF project is ongoing, and for new applications, these will be implemented in the next phase according to turn. So, ALAF is an on-going project, and the implementation of ALAF follows the turn. So, I have been emphasising all this while, Mr Speaker, there is no jumping the queue. So, if you are in the queue, we follow the queue, because I believe everybody is excited and determined enough to live in their respective areas. So, if you are in the queue, please follow the queue. We cannot jump the queue.

For the information of the Honourable Members for Bukit Semuja, Tebedu and Kabong, Sarawak Energy has spent RM1.16 billion over a six-year period (2020-2025) for works to improve, upgrade and strengthen the distribution system throughout Sarawak. This is to increase the reliability of the supply system, including a total of RM241 million (RM241 million) for Bukit Semuja, Tebedu and Kabong. So, out of that RM241 million, it is for Bukit Semuja, Tebedu and Kabong. These projects cover works such as overhead line rerouting, addition of new lines, installation of lightning protection devices on overhead lines and construction of new substations.

For the information of the Honourable Members for Telang Usan and Batu Danau, the programme for replacing batteries and key components of the SARES system is an important initiative to ensure electricity supply continues uninterrupted. Batteries function to store solar energy for use at night or when the weather is cloudy. Sarawak Energy has implemented this programme since 2024.

The Sarawak Government has allocated RM30 million under the Twelfth Malaysia Plan (RMKe-12) to implement the battery and key component replacement programme in phases for SARES systems that have reached the end of their lifespan. So far, RM23 million has been spent on battery replacement involving 81 villages with 2,046 households, which have been fully completed throughout Sarawak.

The Sarawak Government has allocated RM33.6 million (RM33.6 million) under the Thirteenth Malaysia Plan (RMK-13). I repeat. The Sarawak Government has allocated RM33.6 million under the Thirteenth Malaysia Plan (RMK-13) to continue this programme, which will begin next year.

For the information of the Honourable Member for Bukit Assek, both examples highlight common issues between landlords and tenants. Under the law, landlords are responsible for the premises they own. In both cases, SESCO was exercising its rights under the Electricity Ordinance (Cap. 50), Section 33A. To safeguard landlords from such situations, SESCO has consistently issued advisory messages through media channels and stakeholder engagements, reminding landlords and property owners to:

(a) perform due diligence checks on potential tenants; (b) ensure tenants apply for their own electricity account with SESCO; and (c) subscribe to and monitor tenants' electricity accounts via the SEB Cares app to ensure proper usage and billing.

Electricity theft is a criminal offence. When theft occurs within premises registered under the owner's name, it becomes the owner's responsibility to manage the matter with the tenant, as the tenancy agreement is between the owner and the tenant.

SESCO continues to provide support within its capacity. However, these are legal matters that require court adjudication.

For the information of the Honourable Member for Daro, the implementation of the electricity supply project at SPK Kampung Badong will begin in December this year, within this month, and is expected to be completed in the first quarter of 2026.

For the information of the Honourable Member for Kalaka, as I have informed earlier, the implementation of the Electricity Supply Upgrading project for the Betong Division, involving Sarawak Government expenditure of RM152 million, will be carried out within the period of the Thirteenth Malaysia Plan (RMKe-13), covering works including:

(a) 33kV Monopole Lines from Serudit to Saratok; (b) 33/11kV Kabong/Roban Substation; (c) 33kV MVCC Lines from Saratok to Simpang Kabong; and (d) 33kV MVCC Lines from Serudit to Pusa.

The Thirteenth Malaysia Plan (RMK-13) will begin next year. So that will solve your problem in the long term.

For the information of the Honourable Member for Baleh, the solar systems under the Sarawak Alternative Rural Electrification Scheme (SARES), with an original design of 2 kilowatt-hours (kWh) per day, had their capacity increased to 3 kWh per day in 2019. The 3 kWh per day capacity needs to be maintained to protect the lifespan of the key battery components so that the overall system can last at least six years. So, the design size is that we cannot increase beyond the three-kilowatt hour per day. So, I hope that will be understood by my colleague from Baleh.

SARES is a temporary solution to supply electricity to residents in remote and hard-to-access areas that do not yet have electricity supply infrastructure. Accordingly, Sarawak Energy is always looking for alternatives to ensure all SARES systems can be connected to the Sarawak Main Grid System in the future.

For the information of the Honourable Member for Engkilili, the Sarawak Government has allocated RM20 million for the off grid-to-grid transition initiative to connect communities currently supplied with hybrid systems, SARES, or diesel power stations in Song, Bukit Mabong and Telang Usan to the grid. This will benefit 235 households involving eight villages and is expected to be completed by the end of this year.

This effort will be continued, where my ministry, through the implementing agency Sarawak Energy, is endeavouring to identify more settlements that can be connected to the main grid, including Rumah Rentap, Rumah Penghulu Robert and Rumah Upok, so that village residents in the affected areas will enjoy more stable electricity supply from the grid.

For the information of the Honourable Member for Telang Usan, the Feasibility Studies for Cascading Power Sources (CPS) in Tutoh are still being carried out and are expected to be completed in the first quarter of next year. So far, 16 engagement sessions have been held and coordinated by my ministry in cooperation with the Resident's and District Office of Miri and Sarawak Energy, together with local representatives, local communities, community leaders and heads of ethnic groups, as well as relevant government departments and agencies. This is to ensure that the local communities involved understand and accept the proposed implementation of this project without hesitation. So, we want to be sure the local communities fully understand the concept of Cascading Power Source (CPS).

Furthermore, Mr Speaker, for the potential of Cascading Power Sources (CPS) at Ulu Sungai Akah as proposed, my ministry notes it for further study.

Specific Issues (Telecommunication)

For the information of the Honourable Members for Meradong, Tellian, Simunjan, Kabong, Krian and Kalaka, MCMC has conducted Quality of Service (QoS) assessment tests in all these areas this year.

Following the assessment, service providers have been directed to take appropriate action to improve their network performance and service quality.

I hope that with the implementation of JENDELA 2 later, next year it will take into account the areas raised, with the addition of new towers so that coverage problems and network quality performance can be addressed.

CONCLUSION

Mr Speaker, I have now come to the conclusion. Before ending my speech, I would first like to extend my warmest congratulations and appreciation to Mr Speaker, the Deputy Speaker, the Secretary and all officers of this August House for conducting the sittings of this honourable House in an orderly and successful manner.

Thank you also to the State Secretary of Sarawak, the Federal Secretary, the Attorney General of Sarawak, the State Financial Secretary of Sarawak, all Permanent Secretaries of ministries, Heads of Departments, the reporters and all parties who have given their cooperation to make this session a success.

I would also like to express, I would also like to record my appreciation to both Deputy Ministers in my ministry, the Permanent Secretary, the Deputy Permanent Secretary and all officers in my ministry, as well as all officers and agencies under the purview of the Ministry of Utilities and Telecommunications, for their high commitment during the sitting of the Sarawak State Legislative Assembly this time.

At this opportunity, I would also like to say to those who are Christians, a happy Christmas, and to everyone, a happy New Year.

I pray to Allah S.W.T. to always bestow His mercy and blessings upon us all, and to protect my beloved Sarawak so that it remains united, peaceful, prosperous and progressive.

And as usual, I do not miss the opportunity to share pantun with my colleagues in this honourable House.

Terubok fish, salted fish, Fit for a meal with office colleagues; YAB Premier is truly caring, Utilities provided, telecommunications strengthened.

Up until now Arsenal still reigns, Manchester City keeps trying; Win or lose, do not grieve, With Liverpool, Man U hides away in a cave.

Chelsea is happy when winning in style, Newcastle also keeps trying; Please do not be angry with me, A football pantun, just for entertainment.

Where there is cassava there are limits, Where there is paddy there is rice, Where there is oil there is gas; Sarawak awaits PETRONAS's answer, Hopefully it can be answered soon, Do not be too hardhearted.

The fragrant scent of gaharu wood, Even more fragrant when sun-dried; See you in the New Year, May Sarawak be progressive and prosperous.

With that, Mr Speaker, I conclude my winding-up speech for the Sarawak Ministry of Utilities and Telecommunications. Thank you.

Deputy SpeakerEN

Thank you, the Honourable Minister. Next, I respectfully call upon the Honourable Dato Sri John Sikie anak Tayai to deliver the winding-up speech for the Ministry in the Premier's Department (Jabatan Premier). Please proceed, the Honourable Member.

Dato Sri John Sikie anak TayaiPRS · GPSMinister in the Premier's Department · Kakus

dan Ahli Dewan Undangan Negeri N.60 Kakus (YB Dato Sri John Sikie anak Tayai): Terima kasih, Tuan Speaker. Selamat petang, Salam sejahtera, Salam Sarawak Maju Makmur dan Salam Segulai Sejalai.

First and foremost, I would like to congratulate Yang Amat Berhormat Premier Sarawak on being conferred “the Order of the Rising Sun, Gold and Silver Star” by His Majesty Emperor Naruhito. This award is in recognition of your outstanding contribution towards promoting strategic regional exchange and mutual understanding between Japan and Malaysia especially in economics and green energy cooperation.

Please accept my warmest congratulations on the reappointment of Yang Berhormat Tan Sri Datuk Amar Haji Mohamad Asfia bin Awang Nasar, the Speaker of the Sarawak State Legislative Assembly for the tenth consecutive time as the longest-serving legislative Speaker in Malaysia, having first assumed the role as Speaker on 15th November 2000.

Tuan Speaker, I would like also to congratulate Yang Amat Berhormat Premier of Sarawak for presenting a holistic, comprehensive, people centric and forward-looking Budget 2026 with the theme of: “Empowering People, Advancing Prosperity, Building a Resilient Future”.

The Budget 2026 is significant as we move towards the Thirteenth Malaysia Plan (2026-2030) which is the second half of first five years development plan towards the realization of the Post COVID-19 Development Strategy (PCDS) 2030. I am confident that this visionary budget would help to accelerate the implementation of the planned programmes and projects. The successful execution of these initiatives will enable Sarawak to make a quantum leap towards achieving a developed state status by the year 2030.

Tuan Speaker, thank you for giving me the time and opportunity to deliver my winding up speech this evening.

I will now speak on matters relating to my portfolio, which covers the following agencies, namely Majlis Adat Istiadat Sarawak, Mahkamah Bumiputera Sarawak, Unit Pentadbiran, Unit Pengurusan Imigresen dan Buruh; and Unit Keselamatan dan Penguatkuasaan Sarawak.

Sarawak Customs and Protocol Council

Dato Sri John Sikie anak TayaiPRS · GPSMinister in the Premier's Department · Kakus

Tuan Speaker, first, I will begin with matters relating to the Majlis Adat Istiadat Sarawak.

In line with its main statutory functions and roles, the Majlis Adat Istiadat Sarawak has been carrying out works on the preservation, development and dissemination of Adat throughout the year 2025.

The preservation works are carried out by writing down and recording in electronic media the native Adat in their original forms. These works have been ongoing since 1974.

With the increase in the number of native races of Sarawak the burden is getting heavier for the Majlis Adat Istiadat Sarawak to shoulder the research and writing in the conventional form. As such, Majlis Adat Istiadat Sarawak is exploring new methods to assist its research and writing of Adat, for example the application of Artificial Intelligence.

The development of Adat is a study of the relevance and significance of Adat in the regulation of social relations and affairs of the native communities. Where the Adat is diminishing or no longer relevant or significant due to the changed or changing socio-economic environment, the Adat would be modernised to give them a new lease of life and to adjust and adapt them to the prevailing socio-economic environment.

Most of the native Adat are derived from ancient beliefs, customs, practices, and spiritual sanctions to name but a few. Therefore, many of the Adat are not quite relevant for the regulation of the prevailing social relations and affairs of the native communities. In this regard, the Majlis Adat Istiadat Sarawak has embarked on the modernisation of Adat since the end of 2022. This is a very academic exercise focusing on, among other things, reinterpretation, enhancement, and making new provisions for the Adat.

The reinterpretation of Adat is to examine the purpose and rationale underlying a traditional Adat from a different perspective. For example, an Adat which is intertwining with traditional spirituality. This is to explore the ideal to be achieved in a community or society through the application of the Adat. Once the rationale is understood, then an alternative provision with secular dimensions would be recommended.

The reinterpretation would not abolish the traditional Adat but provide an alternative secular provision. In this manner, the Adat could exist side by side and cater for the needs of natives in a diverse social situation in a community.

The enhancement of Adat is to improve or mitigate the harshness or negative impact of Adat. Some Adat could cause mental or psychological distress to one or both parties or to the children in certain cases. For example, Adat regulating the custody of children following a divorce.

It is quite common that the Adat allows for split custody of children, that is dividing children equally between the parents following their divorce. This Adat could cause mental and psychological distress to parents and children. In some cases, the Adat is almost impossible to enforce.

To mitigate the harshness of such Adat, the Majlis Adat Istiadat Sarawak suggests that one of the parents should be awarded legal custody of all the children while the other would get access and visitation rights over the children. The parent who does not get legal custody would provide maintenance to the children. In cases where the children are teenagers and understand the situation, the court may ask which parent they would want to live with.

New provision for Lacuna in Adat

The making of a new provision is to fill the lacuna (gap) or to clarify the silence in an Adat. Many of the Adat were formulated and evolved many centuries ago and catered for the social relations and affairs of the native communities during this times.

Today they are not quite comprehensive for the regulation of some important social relations and affairs of the modern native communities. Thus, there are many gaps or lacuna in Adat.

For example, there is no clear Adat in the Iban communities regulating the distribution of property between the old longhouse and new longhouses built by the people originating from the old longhouse and situated in the same locality.

Similarly, there is no clear Adat stating whether those ‘natives’ conferred under Section 3 of the Interpretation Ordinance, 2005 are subject to the Adat of the native race which he or she claims to belong to.

In such cases, the Majlis Adat Istiadat Sarawak is exploring the possibilities of recommending new provisions to fill the gaps. In a similar manner, where the Adat is silent on certain important matters, new provisions would be recommended to clarify the silence in the Adat.

Majlis Adat Istiadat Sarawak has continuously engaged with Ketua Masyarakat and Ketua Kaum through a series of workshops as part of our ongoing effort to review the Adat Iban, 1993; Adat Bidayuh, 1994; and Adat Kayan-Kenyah, 1994, which have since been separated into two distinct Adat: Adat Kayan and Adat Kenyah.

Throughout the year 2025, a total of 20 workshops were conducted. The objective was to verify the veracity of the Adat under review.

As of now, the review exercises have shown remarkable progress in the drafting stage. Prior to that, the drafts have been verified and presented to the Ketua Majlis, to the Ketua Masyarakat and the Ketua Kaum and tabled before the Majlis in its meeting on 10th and 11th November 2025.

Promotion and Dissemination of Adat

Besides the preservation and development of Adat, Majlis Adat Istiadat Sarawak is also working on writing the Explanatory Notes for Adat under review. It is hoped that the Notes would be helpful to provide a better understanding of Adat to practitioners, enthusiasts and readers.

In line with its roles and functions of promoting and disseminating Adat, Majlis Adat Istiadat Sarawak has conducted 10 Awareness Programmes involving 444 newly appointed Ketua Masyarakat and Ketua Kaum from Kuching, Serian, Sri Aman, Sibu, Sarikei, Mukah, Bintulu, Miri, and Limbang divisions this year. The purpose was to enhance the knowledge of these newly appointed Ketua Masyarakat and Ketua Kaum on Adat.

Majlis Adat Istiadat Sarawak also conducted Seminar Adat Zon Utara involving 206 community leaders, officers from resident and district offices in Miri, Limbang and Bintulu Divisions, and various government agencies and native associations. The main objective was to enhance awareness of the importance of Adat as well as its preservation and development. Majlis Adat Istiadat Sarawak would continue to promote and disseminate Adat to the native communities and relevant stakeholders.

In October 2025, Majlis Adat Istiadat Sarawak organized the first ever Simposium Adat Bidayuh which involved all the 409 Ketua Masyarakat and Ketua Kaum Bidayuh and members of Bidayuh National Association (DBNA) from Kuching and Serian division.

The main objective was to disseminate information on the review of the Adat Bidayuh in view of the socio-economic changes which have taken place in most Bidayuh communities. This symposium aimed to equip the Bidayuh Ketua Masyarakat dan Ketua Kaum with the latest information on Adat to enable them to discharge their responsibilities effectively.

Collaboration with Relevant Agencies

Majlis Adat Istiadat Sarawak has collaborated with Traditional and Complementary Medicine Division under the Ministry of Health Malaysia in organizing Program Jalinan MADANI: Pemerkasaan Perubatan Tradisional Anak Negeri Sarawak. The purpose was to enhance their understanding on the traditional medical practices of the Natives of Sarawak.

Further, the collaboration aimed to enhance awareness among traditional medicine practitioners regarding Traditional and Complementary Medicine Act, 2016 and to heighten public awareness on the importance of preserving heritage and traditional medicine practices. This programme involved 40 participants, comprising traditional medicine practitioners and selected Ketua Masyarakat throughout Sarawak.

Training and Competency Building

Tuan Speaker, Majlis Adat Istiadat Sarawak has been making a lot of effort in training and competency building for its staff. In this respect, Majlis Adat Istiadat Sarawak has initiated a collaboration with the Centre for Legal Pluralism and Indigenous Law; Faculty of Law, University of Malaya to train and to build the competency of its research officers in their research works. On the 15th to 16th December this year, very soon, research officers will attend a training programme on Legal and Social Research Methodology to be conducted by the Faculty of Law, University of Malaya. This training aims to provide knowledge, research skills and practical abilities in law and sociology research relevant to Adat.

Digital Initiatives

Tuan Speaker, I wish to take this opportunity to report on the ongoing digital transformation efforts under Majlis Adat Istiadat Sarawak. Particularly on the enhancement of our Adat data governance and the upskilling of the frontline officers through the Native Marriage Electronic System Version 2, Digital Record Management Training 2025. A training on Native Marriage Electronic System Version 2, Digital Record Management Training 2025 was held in Miri on 5th and 6th August 2025. 95 participants from district offices and sub-district offices throughout Sarawak participated in the training.

Promotion of Culture Traditions and History of the Natives

Cultures and traditions are part and parcel of the Adat of the natives. In this regard, Majlis Adat Istiadat Sarawak is moving forward through various programmes and initiatives to promote better understanding and appreciation of the Adat which are cultures, traditions, history of various natives of Sarawak. And now, the Native Courts of Sarawak.

Native Courts of Sarawak

Now, I will now touching on matters concerning the Native Courts of Sarawak. The Native Courts of Sarawak have, for generation, played a fundamental role in preserving harmony, resolving disputes, and safeguarding the Adat and customs of our native communities. For many of our rural and interior populations, the Native Courts of Sarawak is often the first and sometimes the only avenue for access to justice. This underscores the importance of ensuring that the institution remains strong, credible, and responsive to the evolving needs of the community.

Tuan Speaker, while awaiting the formal commencement of the transformation programme upon the passing of the New Native Courts Bill, the Native Courts of Sarawak has already taken interim measures to lay out the necessary foundation. For the information of the Honourable Member for Krian, I wish to inform that this august House that the Native Courts of Sarawak is currently working closely with the Human Resource Development and Management Unit to identify and recruit individuals with recognised legal backgrounds as Magistrates. These include those who possess the Certificate of Legal Practice atau (CLP), to serve as Native Courts Magistrates. This interim initiative is both timely and crucial. The growing complexity of cases before the Native Courts of Sarawak requires officers who are not only have a deep understanding of local customs but are also knowledgeable in legal principles and judicial procedures. By recruiting legally trained individuals, we are ensuring that the Native Courts of Sarawak is staffed with personnel capable of handling a wider variety of cases with professionalism, consistency, and fairness.

Furthermore, this recruitment effort will help address the current and anticipated shortage of Magistrates. As the transformation programme progresses, a sufficient pool of qualified officers will be essential to ensure smooth operations, minimize delays, and maintain public confidence in the system. The combination of legal training and contextual understanding of Adat will enable our Magistrates to administer justice effectively, especially in cases where customary principles intersect with broader legal considerations.

Performance of the Native Courts of Sarawak

Now allow me to also touch on the performance of the Native Courts of Sarawak on the settlement of cases filed before the native courts. The Native Courts of Sarawak continue to demonstrate commendable performance in the discharge of judicial duties. Our presiding officers have consistently shown dedication, diligence, and integrity in managing cases, many of which involve complex customary laws and sensitive issues. Their steadfast commitment reflects our continued efforts to uphold justice, strengthen the administration of native law, and ensure that the rights and interests of our communities are protected. I am pleased to report that as of October this year, out of total 18,233 registered court cases since 1992 that involve all levels of courts throughout Sarawak, 13,763 cases or 75% have been settled. There are still 4,470 or 25% cases that remain at several different stages of the process. The Native Courts of Sarawak is making every effort to ensure that these remaining cases are resolved promptly and efficiently.

Tuan Speaker, I would like to take this opportunity also to update this august House on the ongoing Capacity Building Programmes undertaken by the Native Courts of Sarawak. The Native Courts of Sarawak has been actively implementing a comprehensive Capacity Building Programmes involving administrative officers, court clerks and court peons stationed in our district offices and sub-district offices. It also involves our Ketua Masyarakat dan Ketua Kaum across all divisions and districts. This is part of our continuous efforts to strengthen the administration of justice at the grassroots level.

This initiative is designed to enhance their knowledge and understanding of court management, native law procedures, documentation standards and case handling processes. Through a series of structured training sessions, workshops and hands-on practical modules, participants have shown notable improvement in their competency, confidence and ability to discharge their duties in accordance with established procedures. For the current year, the Native Courts of Sarawak has successfully implemented five capacity building programmes, organised across the northern, central, and southern regions of Sarawak. These programmes involved 309 participants from the respective groups mentioned. The overall costs in organising these programmes amounted to RM250,000. The positive outcomes of these programmes have been clearly reflected in smoother case administration, more consistent application of native laws and improved coordination between Ketua Masyarakat dan Ketua Kaum and the Native Courts machinery. Given these encouraging results, the Native Courts of Sarawak will continue this capacity building programmes next year. This is to ensure that all officers, Ketua Masyarakat dan Ketua Kaum are equipped with the necessary skills and knowledge to uphold the integrity and effectiveness of the Native Courts System.

Tuan Speaker, in addition to the formal Capacity Building Programmes, the Native Courts of Sarawak has also organised several District-Level Engagement Sessions or Sesi Libat Urus Peringkat Daerah. This was aimed at providing hands-on guidance and closer engagement and support to officers and Ketua Masyarakat dan Ketua Kaum at selected districts.

These engagement sessions which are initiated this year, have proven to be particularly effective in addressing outstanding cases, where direct discussions with officers, Ketua Masyarakat dan Ketua Kaum and on-site clarification help identify issues and expedite resolutions. They also serve as an important platform to guide newly appointed court clerks, especially those still familiarising themselves with administrative routines, on how to properly update case information and other essential data into the Native Courts System.

This practical, face-to-face approach ensures that officers and clerks gain real working knowledge, reducing errors and improving the accuracy and timeliness of our records. To date, four engagement sessions have been successfully organized in the districts of Siburan, Serian Kapit and Marudi, involving a total of 50 Court Clerks, Court Peons, Ketua Masyarakat dan Ketua Kaum. The total cost of organising these programmes amounted to RM5,844. Through these targeted engagements, we have seen better coordination, faster processing of court matters at the district level and greater confidence among officers and Ketua Masyarakat dan Ketua Kaum in discharging their duties. These efforts complement our larger capacity building agenda and reflect our commitment to strengthening the Native Courts’ operational efficiency at every level.

Tuan Speaker, It is essential that our traditional institutions evolve in tandem with the socio-economic development of Sarawak, that can meet the needs of present and the future generations. The State Government is currently undertaking the construction of new district office buildings at various districts. This initiative reflects our unwavering commitment to ensuring that every corner of Sarawak is equipped with modern, functional and accessible public service facilities for the benefit of our rakyat.

In this regard, the Native Courts of Sarawak will work closely with Administrative Unit to ensure that the design of each district office building will provide space for a Native Courtroom. This careful planning will ensure that the administration of native justice is conducted in a dignified, orderly and professional environment. Furthermore, to promote uniformity and excellence throughout the State, the design of these Native Courtrooms, along with their internal furnishings and equipment, will be standardised across all districts. Such standardisation will not only enhance operational efficiency but also uphold the integrity and stature of the Native Courts System in Sarawak.

Distinctive local motifs and designs unique to the diverse native communities of Sarawak will also be incorporated into these courtrooms. These elements will not only enhancing the identity of each courtroom but also portray the traditions, values and histories that guide the Native Courts in administering justice. Concomitantly, we are ensuring that these courtrooms are equipped with the necessary infrastructure to support the application of digital technology in future court proceedings. This includes facilities for electronic documentation, virtual hearings and improved digital case management. All these features will strengthen efficiency, accessibility and transparency on the native courts’ judicial processes. UNIT PENTADBIRAN

Ketua Masyarakat dan Ketua Kaum

Tuan Speaker, now I go to the Unit Pentadbiran. Kerajaan sememangnya amat memahami realiti semasa, khususnya peningkatan kos sara hidup dan keperluan operasi di kawasan luar bandar yang semakin meningkat telah memberi kesan kepada Ketua Masyarakat dan Ketua Kaum dalam melaksanakan amanah mereka.

Dalam masa yang sama, skop tugas Ketua Masyarakat dan Ketua Kaum terus berkembang selaras dengan aspirasi Pelan Pembangunan Pasca COVID-19 2030 (PCDS 2030). Mereka kini memainkan peranan penting bukan sahaja dalam urusan pentadbiran komuniti tetapi juga penyelarasan pembangunan, kebajikan masyarakat, pelaksanaan Rural Transformation Project (RTP), penglibatan dalam mesyuarat rasmi serta aktiviti sosial setempat.

Keadaan ini memerlukan mereka menanggung kos operasi tambahan seperti pengangkutan, komunikasi dan perbelanjaan harian lain bagi memastikan penyampaian perkhidmatan kepada rakyat dapat dilaksanakan dengan berkesan.

Menyedari cabaran dan tanggungjawab besar ini, kerajaan telah meluluskan kenaikan gaji dan elaun Ketua Masyarakat dan Ketua Kaum sebanyak RM400 sebulan, melibatkan 7,710 jawatan Ketua Masyarakat dan Ketua Kaum, berkuat kuasa mulai 1 Januari 2026.

Dalam hal ini, saya merakamkan setinggi-tinggi penghargaan kepada Yang Amat Berhormat Premier Sarawak atas kelulusan kenaikan gaji dan elaun ini.

Ini merupakan peningkatan tertinggi dalam sejarah institusi Ketua Masyarakat dan Ketua Kaum dan mencerminkan komitmen serta penghargaan Kerajaan terhadap peranan besar mereka dalam memastikan dasar Kerajaan sampai kepada setiap lapisan rakyat.

Selaras dengan kenaikan ini, Ketua Masyarakat dan Ketua Kaum hendaklah mempertingkatkan prestasi penyampaian perkhidmatan, meningkatkan akauntabiliti serta menjalankan tugas dengan penuh integriti selari dengan hala tuju PCDS 2030 untuk menjadikan Sarawak sebuah Negeri Maju menjelang 2030.

Pada masa yang sama, kerajaan turut memperkukuhkan tatacara pengurusan Ketua Masyarakat dan Ketua Kaum merangkumi penambahbaikan syarat-syarat dan proses pelantikan serta perincian peranan dan tanggungjawab yang lebih jelas.

Langkah ini bertujuan memastikan setiap pelantikan dibuat secara telus, berintegriti dan berasaskan merit, di samping memastikan Ketua Masyarakat dan Ketua Kaum benar-benar memahami mandat yang diberikan kepada mereka.

Penambahbaikan ini juga penting bagi memastikan struktur kepimpinan di peringkat akar umbi lebih tersusun, responsif dan profesional. Ketua Masyarakat dan Ketua Kaum bukan sahaja menjadi jambatan antara kerajaan dan rakyat, tetapi juga menjadi pemangkin pembangunan setempat, pemudah cara pelaksanaan dasar-dasar negeri, serta tonggak kestabilan sosial dalam komuniti masing-masing.

Tuan Speaker, di samping itu, kerajaan turut memberi penekanan terhadap tadbir urus di peringkat Jawatankuasa Kemajuan dan Keselamatan Kampung (JKKK). Setakat ini, sebanyak 6,374 Jawatankuasa Kemajuan dan Keselamatan Kampung telah ditubuhkan, yang membabitkan seramai 63,512 ahli berdaftar.

Justeru itu, bagi memperkukuhkan peranan strategik Jawatankuasa Kemajuan dan Keselamatan Kampung dalam pembangunan kampung, mulai Januari 2025, kerajaan telah memperkenalkan dan mengguna pakai sebuah sistem elektronik yang dinamakan Sistem e-J3K bagi mengurus dan menyelaras seluruh struktur pentadbiran Jawatankuasa Kemajuan dan Keselamatan Kampung.

Sistem ini berfungsi sebagai pangkalan data rasmi bagi menyelaras proses pelantikan, pengurusan profil kampung, penyediaan pelan tindakan kemajuan kampung, penyimpanan minit mesyuarat serta rekod aktiviti dan projek pembangunan kampung.

Melalui inisiatif digital ini, pengurusan Jawatankuasa Kemajuan dan Keselamatan Kampung akan menjadi lebih teratur, cekap dan selari dengan agenda transformasi digital Kerajaan di bawah PCDS 2030 dan Sarawak Digital Economy Blueprint 2030 (SDE 2030).

Pewujudan Jawatan Baharu Ketua Masyarakat dan Ketua Kaum

Tuan Speaker, untuk makluman Ahli Yang Berhormat bagi Balingian, Engkilili, Serembu dan Kabong, kerajaan peka terhadap keperluan untuk mewujudkan jawatan baharu Ketua Masyarakat dan Ketua Kaum di seluruh Sarawak, termasuklah di kawasan Balingian, Engkilili, Serembu dan Kabong.

Setakat ini, kerajaan telah menerima lebih kurang 1,000 permohonan cadangan pewujudan jawatan baharu Ketua Masyarakat dan Ketua Kaum dari semua bahagian di seluruh Sarawak.

Kesemua permohonan tersebut telah dikaji dan diteliti secara menyeluruh dengan mengambil kira beberapa faktor penting, antaranya status pemilikan tanah, faktor geografi, pertambahan bilangan rumah serta penduduk, keluasan kawasan bidang kuasa, serta pembinaan rumah panjang dan penempatan baharu.

Permohonan-permohonan berkenaan telah dibentangkan dalam Mesyuarat Jawatankuasa Khas Pengurusan Hal Ehwal Ketua Masyarakat dan Ketua Kaum dan seterusnya akan diangkat untuk pertimbangan selanjutnya oleh pihak berkuasa melulus.

Pengiktirafan sebagai Bumiputera Sarawak

Tuan Speaker, mulai 1 Januari 2025, semua permohonan untuk diiktiraf sebagai Bumiputera Sarawak dibuat sepenuhnya secara dalam talian, iaitu melalui Sarawak Native Recognition Application System (SARAS).

Pada 26 Jun 2025, sistem ini telah ditambah baik dengan menambah fungsi semakan kelayakan atau “eligibility” bagi memastikan hanya permohonan yang memenuhi syarat sahaja akan diproses dan dibawa ke Jawatankuasa Pengiktirafan Sebagai Bumiputera Sarawak (JPBS) untuk dipertimbangkan.

Setakat ini, sebanyak 5,790 permohonan untuk diiktiraf sebagai Bumiputera Sarawak telah diterima dan dipertimbangkan oleh Jawatankuasa Pengiktirafan Sebagai Bumiputera Sarawak (JPBS).

Daripada jumlah tersebut sebanyak 5,186 permohonan telah diluluskan, iaitu sebanyak 1,835 (35%) telah diiktiraf sebagai komuniti Iban, 1,718 (33%) diiktiraf sebagai komuniti Bidayuh, 601 (12%) diiktiraf sebagai komuniti Melayu, 336 (6%) diiktiraf sebagai komuniti Melanau, 199 (4%) diiktiraf sebagai komuniti Murut atau Lun Bawang, 146 (3%) diiktiraf sebagai komuniti Kenyah, 144 (3%) diiktiraf sebagai komuniti Kayan dan selebihnya daripada komuniti lain.

Pengurusan Senapang Patah Di Sarawak

Tuan Speaker, kerajaan amat prihatin dan sentiasa mengambil berat kepentingan keselamatan awam serta kesejahteraan rakyat, terutamanya dalam mengelakkan sebarang risiko penyalahgunaan senjata api khususnya yang melibatkan senapang patah.

Untuk makluman Ahli Yang Berhormat bagi Ngemah, sebagai langkah kawalan, Kerajaan masih mengekalkan polisi semasa berkaitan pemilikan senapang patah, iaitu pemilikan senapang patah hanya boleh ditukar nama daripada ibu bapa kepada anak lelaki atau anak perempuan sahaja. Manakala penggunaan dibenarkan hanya untuk tujuan perlindungan hasil pertanian (protection of agriculture crop).

Walau bagaimanapun, kerajaan sentiasa bersedia untuk menilai semula polisi berkaitan, termasuklah syarat dan keperluan permit carry and use, selaras dengan tuntutan dan tahap keselamatan semasa.

Ke arah Pendigitalan Rekod Pemegang Lesen dan Permit Carry and Use bagi Senapang Patah

Tuan Speaker, bagi memperkukuhkan tadbir urus pengurusan senapang patah, kerajaan telah mengambil langkah proaktif dengan membangunkan satu sistem pangkalan data berpusat yang dikenali sebagai e-Firearm System.

Sistem ini merupakan satu transformasi digital penting yang bertujuan mempertingkatkan kecekapan, ketelusan dan integriti dalam pengurusan lesen senapang patah di Sarawak.

Sistem ini bukan sahaja berfungsi sebagai platform penyimpanan dan penyelenggaraan rekod pemegang lesen serta pemegang permit carry and use, tetapi turut digunakan bagi tujuan permohonan pindah daftar lesen senapang patah dan permohonan penukaran nama pemilik senapang patah.

Dengan adanya sistem digital ini, proses pengurusan, pemantauan dan audit keselamatan dapat dilaksanakan secara lebih sistematik dan efisien. Firearm System dijangka akan digunakan sepenuhnya mulai tahun hadapan, sekali gus menandakan satu lagi pencapaian penting dalam usaha pendigitalan perkhidmatan Kerajaan Negeri.

Immigration and Labour Management Unit

Dato Sri John Sikie anak TayaiPRS · GPSMinister in the Premier's Department · Kakus

Tuan Speaker, I will now proceed on matters concerning Unit Pengurusan Imigresen dan Buruh.

Transforming Immigration and Labour Management in Sarawak

In tandem with the Digital Transformation Plan under the Digital Government Services as outlined in Sarawak Post COVID-19 Development Strategies 2030 and the Sarawak Digital Economy Blueprint 2030, the Sarawak Government through the Immigration and Labour Management Unit has initiated the Foreign Workers Transformation Approach to significantly reduce the turnaround time for approval of work permit on foreign workers.

This system has greatly enhanced transparency, user convenience, enabling transactions to be carried out online without the need to visit the physical service counters of the relevant agencies. In short, the application and approval can be done within 24 hours by the relevant agencies and authorities.

Since its implementation in January 2025, the system has received a total of 18,554 Approval in Principle (AP) applications, and 106,242 AP quotas have been approved in accordance with industry needs.

The processing time starting from the submission until the approval of the application, improved significantly from 197 days previously to an average of just 54 days reflecting a major achievement. This processing time will be further shortened as we move forward in the utilisation of the system.

With the introduction of this digital platform, the Sarawak Government now has access to accurate, real-time data that enables better balancing of labour demand and supply across various economic sectors in the state. The data gathered through the system also supports the state’s big data initiative, which aims to drive Sarawak’s transition towards data-driven decision-making.

Tuan Speaker, I would also like to inform this august House that the FWTA system has been further enhanced with two additional submodules, namely Expatriate Platform for Recruitment and the Talent (EXPRT); and Household and Assistance Vetting and Employment Network (HAVEN).

The Expatriate Platform for Recruitment and Talent (EXPRT) submodule was implemented on 1st November 2025 for managing expatriate application, while the Household and Assistance Vetting and Employment Network (HAVEN) submodule will come into effect in January 2026 for household assistant or maid application.

These enhancements clearly demonstrate that we are on the right track in ensuring that matters related to immigration and labour are managed in a systematic, efficient, transparent, and holistic manner through the effective adoption of digital technologies.

To ensure that this initiative is fully optimised, ILMU has conducted various engagement sessions with industry players and key stakeholders since 2024. In addition, the system was showcased and presented to stakeholders during the State Labour Day event on 18th May 2025 at the Hikmah Exchange Convention Centre, which was officiated by Yang Amat Berhormat Premier Sarawak and attended by 1,600 employers and employees. This event is one of the program and engagement to ensure that the target significant to ensure that the target groups receive accurate, timely, and comprehensive information regarding the implementation of the FWTA initiative.

Sarawak Security and Enforcement Unit

Dato Sri John Sikie anak TayaiPRS · GPSMinister in the Premier's Department · Kakus

I will now proceed with matters relating to the Unit Keselamatan dan Penguatkuasaan Sarawak (UKPS).

Strengthening Security, Enforcement and Resilience in Support of PCDS 2030

Unit Keselamatan dan Penguatkuasaan Sarawak (UKPS) is committed to ensure Sarawak as a ‘Safe and Secured State’ as encapsulated in the Post COVID-19 Development Strategy 2030. In this respect, UKPS is working together with other enforcement agencies in maintaining law and order, which is important to ensure uninterrupted economic growth and development. For this purpose, UKPS has established nine sections to carry out its responsibilities and duties efficiently and effectively in ensuring and maintaining the state security.

Integrated Enforcement, Investigations, and Blockade Operations

UKPS is the lead agency in coordinating multiagency enforcement operations with strategic partners such as the Royal Malaysia Police (PDRM), Forest Department, and Immigration Department in combating illegal activities such as illegal logging, fishing, and sand dredging. More importantly, these efforts are vital in protecting the economic resources of the state. Throughout 2025, UKPS has successfully coordinated and participated in multiple joint operations, including OP Bersepadu JIM, OP Mega Lusuh, OP Jongkong, OP Bersepadu LPG, OP Bersepadu Samalatong, and OP Blocus. For the same period, UKPS has achieved 100% conviction rate in its investigations and prosecutions under the various state ordinances.

Critical Progress: Establishing UKPS Command and Control Hubs for State Safety and Disaster Management

UKPS has developed Markas as its vital command and control hub which is very significant in enhancing the state’s safety and security. To date, five markas are already in operation, namely in Kuching, Tanjung Manis, Bintulu, Miri, and Lawas.

Enhancing Maritime Security and SAR Capability

Tuan Speaker, the Sarawak Coastguard (SC) is responsible for protecting our vast maritime domain, focusing on improving fishermen security, providing vital Search and Rescue (SAR) services and protecting natural resources.

In 2025, the Sarawak Coastguard has executed 158 maritime operations to protect Sarawak Exclusive Economic Zone, enforcing the various laws including the Malaysian Fisheries Act, 1985. Currently, the Sarawak Coastguard has 12 vessels of various classes for their operational purposes. They are in the midst of acquiring three more additional vessels.

Community Emergency Response Team (CERT)

UKPS is also working closely with the communities in establishing Community Emergency Response Team (CERT) and related volunteer efforts. The ongoing CERT 2.0 initiatives have been conducted at Endap, Samarahan, Trusan, Lawas, Spaoh, Betong, and Ngungun in Kanowit.

Issues Raised by Ahli-Ahli Yang Berhormat

Dato Sri John Sikie anak TayaiPRS · GPSMinister in the Premier's Department · Kakus

Tuan Speaker, seterusnya saya ingin memberi maklum balas mengenai perkara-perkara yang dibangkitkan oleh Ahli-ahli Yang Berhormat bagi Pelagus, Balingian, Bukit Semuja, Daro, Bukit Begunan, Bukit Assek, Batu Kitang dan Ngemah.

Membina sebuah Mahkamah Bumiputera di Kapit

Untuk makluman Ahli Yang Berhormat bagi Pelagus, buat masa ini, Kerajaan Sarawak belum mempunyai perancangan untuk mendirikan sebuah bangunan Mahkamah Bumiputera Sarawak di bahagian Kapit. Namun, Kamar Mahkamah Bumiputera Sarawak ini adalah merupakan salah satu skop utama dalam reka bentuk State Pre-Approved Plan bagi setiap bangunan pejabat daerah di seluruh Sarawak.

Bagi urusan pentadbiran adat dan perundangan di bahagian Kapit, terdapat kemudahan Bilik Mahkamah Bumiputera di Pejabat Daerah Kapit, Song dan Belaga bagi memudahkan pelaksanaan fungsi kehakiman di peringkat daerah masing-masing.

Resthouse Balingian

Untuk makluman Ahli Yang Berhormat bagi Balingian, status projek resthouse adalah dalam proses permohonan pertapakan dan reka bentuk. Projek dijangka bermula pada pertengahan tahun 2026 dan dijangka siap pada tahun 2027.

Pejabat Daerah Daro

Untuk makluman Ahli Yang Berhormat dari Daro, konsep bangunan Pejabat Daerah Daro adalah berdasarkan reka bentuk State Pre-Approved Plan yang dibangunkan oleh Jabatan Kerja Raya Sarawak. Reka bentuk ini digunakan bagi mempercepatkan pelaksanaan pembinaan bangunan pejabat daerah di seluruh Sarawak.

Bangunan pejabat daerah ini akan menempatkan agensi pentadbiran di peringkat daerah iaitu Pejabat Daerah Daro dan beberapa agensi Kerajaan Sarawak yang berpejabat di daerah Daro. Tender dijangka akan dikeluarkan pada suku pertama tahun 2026. Tempoh pelaksanaan projek adalah selama 24 bulan dan akan dilaksanakan oleh Jabatan Kerja Raya Sarawak.

Federal Government Building

Untuk makluman Ahli Yang Berhormat bagi Bukit Semuja, Pejabat Setiausaha Persekutuan Sarawak (SUPS) telah membuat tinjauan keperluan Bangunan Gunasama Kerajaan Persekutuan (BGKP) di bahagian Serian. Berdasarkan hasil tinjauan ini, satu cadangan untuk mewujudkan telah pun disediakan. Walau bagaimanapun, cadangan ini perlu melalui beberapa proses dan diperhalusi terlebih dahulu sebelum ianya dikemukakan kepada Jabatan Perdana Menteri serta Kementerian Ekonomi bagi permohonan peruntukan melalui Rancangan Malaysia Ketiga Belas Rolling Plan 2 (RP2) Tahun 2027 untuk pertimbangan dan kelulusan.

Pada 25 September 2025, lawatan pemeriksaan dan penilaian tapak cadangan diketuai oleh Bahagian Pengurusan Projek 5, Cawangan Kerja dan Bangunan Am 1, Ibu Pejabat Jabatan Kerja Raya Malaysia telah selesai dilaksanakan. Tujuan lawatan tersebut adalah bagi menilai keadaan tapak cadangan dan seterusnya mengemaskini dan mengemukakan Anggaran Kos Awalan (AKA) dengan mengambil kira kos pelaksanaan projek secara Building Information Modelling (BIM) serta kos keperluan seismik. Setakat ini, pejabat SUPS sedang menyelaras maklumat bagi penyediaan kertas cadangan pembangunan untuk dikemukakan kepada Jabatan Perdana Menteri.

Pantu Administrative Centre

Untuk makluman Ahli Yang Berhormat bagi Bukit Begunan, projek pembinaan Pejabat Daerah Pantu telah diluluskan dalam Kajian Separuh Penggal Rancangan Malaysia Kedua Belas dengan peruntukan sejumlah RM15 juta. Reka bentuk bangunan Pejabat Daerah Pantu juga akan menggunakan reka bentuk State Pre-Approved Plan yang dibangunkan oleh Jabatan Kerja Raya Sarawak yang akan menempatkan agensi pentadbiran di peringkat daerah. Status semasa projek pembinaan Pejabat Daerah Pantu dalam proses pengambilan balik tanah. Projek ini dijangka akan bermula pada tahun 2026.

Tuan Speaker, in response to the human resource issues raised by Honourable Member for Batu Kitang, regarding the matter on one-off promotion exercise, I wish to clarify that based on Surat Edaran Jabatan Perkhidmatan Awam, Nombor Rujukan: JPA.(S).600-1/3/26(18) dated 12th November 2024, following the adoption implementation of Sistem Saraan Perkhidmatan Awam (SSPA), the one-off promotion is only for Grade 9 to Grade 10, Grade 10 to Grade 12, and Grade 12 to Grade 13. This one-off promotion exercise does not apply to promotions from Grade 13 to Grade 14 which are formerly known as Grade 52 to Grade 54.

Tuan Speaker, for the information of Honourable Member for Bukit Assek, I would like to clarify on Foreign Workers Transformation Approach (FWTA) specifically on the costs of hiring foreign workers. The FWTA ecosystem consists of three components that require continuous enhancement.

The first component is the provision of critical infrastructure, including the establishment of Integrated Immigration and Labour Management Offices (ILC) in the Southern, Central, and Northern regions of Sarawak.

This also includes the recruitment and development of human capital, the adoption of internationally regulated and certified equipment, and the enhancement of digital technology infrastructure and applications.

In addition, it covers the procurement and customization of movable assets such as vehicles, improving connectivity, and ensuring efficient delivery of services to employers and foreign workers.

At this juncture, it is important for me to reiterate that digitalization is the only one part of the larger ecosystem which is being implemented through FWTA platform. Ultimately, our goal is to bring all these services together directly to your doorstep.

The FWTA Project is implemented through the Public Private Partnership (PPP) model, under which all capital development for the project ecosystem is fully financed by the private sector. The fees collected are used to enhance and upgrade the various components of the ecosystem, which require substantial initial investment such as the development of facilities, the FWTA platform, and related services. These investments are intended to help employers reduce their operational costs in managing the hiring of foreign workers.

Therefore, the investment incurred must be covered through reasonable fee structure, charged to employers who hire foreign workers in the operational and projects in Sarawak.

Based on the Cost and Benefit Analysis atau (CBA) conducted and verified by the relevant State Government agencies on the investment made in the development of this end-to-end ecosystem, the cost, the most appropriate fees to be charged to the employers in hiring foreign workers is RM1,854 per employee.

It must be emphasized there it must be emphasized here that this fee covers the cost of preparing, providing and maintaining all the necessary infrastructure and infostructure throughout the state in order to deliver the services to employers in hiring foreign workers and again not merely the cost of processing fees associated in the issuance of Approval of Principle or AP, Labour Licence, Visa Dengan Rujukan (VDR), Medical Screening and issuance of Non-Sarawakian Identity Card atau (NSIC).

I trust this explanation will clarify the misconception that the costs incurred are purely for the processing fees in the application to, for foreign workers.

Tuan Speaker, the progress achieved through the FWTA Project reflects the State Government’s commitment to modernise the service delivery, strengthening governance, and leveraging digital innovation for the benefit of our industries and our people. We will continue to refine and expand this system to ensure that Sarawak remains competitive, progressive, and well-positioned to address future labour and immigration challenges.

I wish to assure that the industry that we always welcome any constructive feedback especially suggestion on how we can further enhance the effectiveness and efficiency of the immigration and labour management ecosystem in Sarawak as we aspire to become a developed state by the year 2030.

Conclusion

Tuan Speaker, I wish to thank Tuan Speaker, the Deputy Speaker, State Secretary, State Attorney General, State Financial Secretary, Federal Secretary, Deputy Ministers’ in the Department of the Premier of Sarawak, all Head of Departments, and all DUN Staff for the decorum and smooth running of this Dewan Sitting.

Now, before I end my speech, I wish all Christians in this august House and outside, a Merry Christmas and a happy and prosperous New Year to everyone. Now, with these words, I hereby support the Motion on the Supply (2026) Bill 2025.

Saya juga ada dua pantun di sini:

Sungai Sarawak mengalir tenang, Perahu tambang melintas perlahan; Bijaksana sungguh Premier merancang, Sarawak maju makmur hasil kepimpinan.

Burung kenyalang terbang tinggi, Menyapa mentari di langit biru; Rakyat Sarawak setia dan harmoni, Aman damai hidup bersatu padu.

Thank you, Tuan Speaker.

Deputy SpeakerEN

Thank you, YB Dato Sri John Sikie anak Tayai di atas ucapan penggulungan tadi.

Gulai terubok asam terung, Insya-Allah esok penggulungan bersambung.

Deputy Speaker

Ahli-ahli Yang Berhormat, the sitting is now adjourned, and House shall resume its sitting at 9.00 a.m. tomorrow. Insya-Allah.

(Mesyuarat ditangguhkan pada jam 5.51 petang)