Sarawak · 19 October 2026
Nineteenth Sarawak State Legislative Assembly (unedited) · not final · 117 turns · 32,631 words · official PDF ↗
ExperimentalSarawak publishes only unedited transcripts (Belum Disunting). The 19th Assembly was dissolved on 26 Oct 2026. Speakers are matched by our parser and will have some errors.
(Opening)
In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum W.B.T., good morning and greetings of peace. Honourable Members, I have granted leave of absence under Standing Order 81 to Yang Berhormat Dato Sri Tiong King Sing, Honourable Member for N.52 Dudong for today's sitting until 21st October 2026.
CONTINUATION OF DEBATE ON THE SECOND READING OF THE SUPPLY (2027) BILL, 2026 AND MOTION TO REFER THE DEVELOPMENT EXPENDITURE ESTIMATES RESOLUTION FOR THE YEAR 2027
With respect, I invite the Honourable Dato Sri Roland Sagah Wee Inn, Minister of Education, Innovation and Talent Development Sarawak, to deliver the winding-up speech. Please proceed, Honourable Minister.
Terima kasih, Tuan Speaker.
Indah berseri si bunga melati, Mekar berkembang di Taman Bestari; Ilmu disemai membina pekerti, Sarawak maju, Kerajaan GPS dihargai.
Tuan Speaker, first and foremost, I wish to express my sincere appreciation to the Right Honourable Premier of Sarawak for his continued commitment to advancing education, innovation, and talent development as reflected in the 2027 Sarawak Budget.
The allocations provided reaffirm the Sarawak Government recognition that the state’s future prosperity depends on the knowledge, capabilities and potential of its people. On behalf of my Ministry, I wish to assure the Right Honourable Premier that we remain committed to utilising these resources responsibly to deliver meaningful outcomes for our students, educational institutions and communities.
My Ministry remains committed to working closely with the relevant agencies and stakeholders to advance these objectives and to ensure that every investment contributes meaningfully to Sarawak’s long-term development.
EDUCATION
Tuan Speaker, let me begin by highlighting several key education matters in Sarawak:
Strengthening STEM Education
My ministry remains steadfast in supporting and advocating for STEM education through complementary initiatives spanning primary and secondary school levels. As the Dual Language Programme Sarawak (DLP Sarawak) enters its 7th year, our commitment to strengthening students’ foundations in Science and Mathematics through English continues to gain momentum.
In support of this effort, the Ujian Penilaian – DLP Sarawak Year 6 (UP-DLPS 6), now in its 2nd year, plays an important role in identifying learning gaps, and enabling targeted interventions. At the secondary school level, the Sarawak Education Enhancement Programme (SEEP), now in its 2nd year, provides additional academic support to secondary school students in Science and Mathematics at lower secondary level (Form 1, 2 and 3), and Science, Mathematics and pure science subjects at upper secondary level (Form 4 and 5).
Meanwhile, the No Kid Left Behind (NKLB) initiative, now in its third year, continues to support students in the Baram area, with emphasis on Science, Mathematics and English. I am pleased to inform this august House that the NKLB initiative has been shortlisted as a finalist for the prestigious QS Reimagine Education Awards 2026 under the Access, Diversity and Inclusion category. The final results will be announced in London between the 6th to 8th of December 2026.
In another notable achievement, I am proud to inform this august House that SMK Long Bedian K11 has emerged as the National Champion in the Indigenous Children category of the Petrosains Tech4All 2026 competition, demonstrating the immense potential of Sarawak’s indigenous students in STEM, innovation and technology. The school will represent Malaysia at the international competition in Vienna, Austria.
We take pride in the achievement of our young talent, Abner Dominggo anak Collin, a Year 5 student of SK St Edmund, Limbang, who represented Malaysia at the TeenEagle Global Final 2026 in London, United Kingdom, and won the Gold Medal Overall and a Silver Medal in Productive Skills which refers to writing and persuasive speaking. Well done, Abner! You have made Sarawak proud! …(Applause)…
Beyond these ongoing educational initiatives, with regards to the proposed Sarawak Education Council, as announced by the Right Honourable Premier in his 2027 Budget Speech, my ministry will take the necessary steps to establish the Council, including preparing the detailed Terms of Reference and the relevant documentation to facilitate its implementation.
Improving Dilapidated School Facilities
Allow me to turn to matters concerning school infrastructure, particularly dilapidated schools. Currently, 680 schools in Sarawak are classified as unsafe for occupancy there’s under scale six and seven the grading of condition of school, based on scale between one to seven, indicating the need for substantial investment in infrastructure upgrading and improvement works across Sarawak. In terms of implementation progress, under the RM1.0 billion advance payment allocation, 86 dilapidated school projects have been completed, while the remaining 54 are at various stages of implementation.
Under Projek Rakyat, half of the 12 identified projects have been completed, while the other half are either under implementation or at the pre-construction stage. In this regard, I wish to convey my sincere appreciation to the Federal Government for allocating RM1.3 billion in Sabah and Sarawak, as announced by the Right Honourable Prime Minister in the recent Fifth MADANI Budget 2027 speech. It is hoped that a substantial portion of this allocation will be channelled towards upgrading school infrastructure and improving facilities in Sarawak.
Yayasan Sarawak International Secondary School (YSISS)
Tuan Speaker, in April this year, students of YSISS Kuching sat the Cambridge Checkpoint exams for the very first time. I am delighted to share that our students achieved above the international average, in Mathematics and Science, while matching the international benchmark in English, as a Second Language.
Tuan Speaker, talent is everywhere, opportunity is not. Give a rural child a chance and watch them excel. These students, not only excel academically, but also proven and demonstrate their excellence in national and international competitions. Most recently, two teams from YSISS Petra Jaya represented the school at the International Sarawak Bridge and Mapping Challenge 2026, held at Polytechnic Kuching, where one team secured the Gold Medal in the Creative Mapping Challenge.
YSISS sent four teams to participate in the Science Castle Asia 2026 competition, achieving outstanding success with three Gold Awards and one Bronze Award. Notably, two of these teams were hand-picked by Japan-based industries to receive the prestigious Poster Awards. Another achievement worth highlighting is that two of the four teams secured sponsorship to represent Malaysia at the upcoming Science Castle World 2026 in Japan, during the second week of December.
Issues Raised by the Honourable Member
Tuan Speaker, allow me now to spend some time to respond to several education matters raised by the Honourable Members of this august House under the purview of my Ministry. For the information of the Honourable Member for Serembu, the Government will continue to strengthen rural education, STEM and TVET programmes, and educational assistance to ensure equitable access to quality education and talent development across Sarawak.
In regard to the issue raised by the Honourable Member for Balingian, the SMK Balingian project cost has been revised and is still awaiting the Ministry of Economy’s, Federal Ministry waiting for their approval to proceed with the re-tendering process. To respond to the matter raised by Honourable Member for Jepak and Tanjong Batu, for the proposed development of SK Jepak Jaya and YSISS Bintulu, both are still at the planning stage.
As for the information of the Honourable Member for Lingga, my ministry appreciates your concern and constructive suggestions regarding cases of bullying in schools. While, for the information of the Honourable Member for Tamin, my Ministry will continue to work together with the State Education Department, and Federal Department of Public Works (JKR), JKR Federal to monitor the progress of SMK Selangau’s project.
I share the frustration of the Honourable Member for Kabong regarding SK Abang Leman and urge JKR to expedite the long-overdue project. However, at the same time, I wish to appreciate the suggestion and support of the Honourable Members for Batu Kitang, Krian, Daro, Meradong, Meluan, Machan, Bukit Assek, Bawang Assan, Balingian, Tamin, Pelagus, Katibas, Baleh, Murum, and Pujut, regarding the Sarawak Government's extensive investments in educational infrastructure, digital empowerment through smart classrooms, and financial assistance to uplift rural and B40 students across your constituencies.
Higher Education
Free Tertiary Education Scheme (FTES)
Tuan Speaker, I would like to update the august House on the matters of higher education. As of 30 September 2026, a total of 6,246 students, have accepted the FTES at Sarawak-owned Institutions of Higher Learning (SIHLs). These students are enrolled across the four SIHLs, with the following breakdown:
(a) Curtin University Malaysia with 949 students; (b) i-CATS University College with 464 students; (c) Swinburne University of Technology Sarawak Campus with 2,802 students; and (d) University of Technology Sarawak with 2,031 students.
My ministry remains committed to the continued implementation of FTES, to ensure that eligible Anak Sarawak, have greater access to quality higher education, without the financial burden of tuition fees. Recognising that the cost of pursuing higher education, extends beyond tuition fees, the scheme also provides an annual stipend of RM15,000, to eligible students from lower-income households. The stipend is to help cover their living and accommodation expenses. To date, 3,195 students of those who have accepted the FTES offer, qualify for the stipend.
For the information of this August House, in 2026, student intake across the 64 courses under the FTES, experienced significant growth, rising to 3,491 students, compared to 1,528 students in 2025 intake, prior to the establishment of FTES. This represents a substantial increase of 1,963 students or 128.5%. These courses cover a range of disciplines relevant to Sarawak’s strategic economic priorities, including the hydrogen economy, precision agriculture, data centre development and the aerospace industry. We are confident that the momentum will be sustained.
Therefore, I wish to express my sincere appreciation to the Honourable Members for their efforts in reaching out to communities, particularly in promoting FTES in rural areas. I encourage them to continue raising awareness among rural communities and to ensure that they are well informed of and able to benefit from the opportunities offered under FTES.
Complementing these efforts, my Ministry has conducted outreach programmes, to bring information on FTES and other available higher education opportunities closer to the people, particularly those in rural communities. For further clarification on matters raised regarding FTES, Honourable Members may always refer to the Ministry’s official website.
University of Technology Sarawak (UTS), Faculty of Medicine
In a related development, the feasibility study for the establishment of the first wholly state-owned Faculty of Medicine at UTS has been completed. The next step is to fulfil the relevant requirements and criteria and approval by the Ministry of Higher Education, the Malaysian Medical Council and the Malaysian Qualifications Agency, including the necessary infrastructure, before the medical programme can commence.
Issues Raised by the Honourable Member
To the Honourable Members for Tupong, Batu Lintang, Kota Sentosa, Batu Kitang, Engkilili, Kalaka, Tellian, Baleh, Tanjong Batu, and Batu Danau, thank you for your strong support of the Sarawak Government's FTES, TVET expansion and talent development initiatives. For the information of the Honourable Member for Tanjung Datu, we cannot stop our graduates to pursue employment opportunities outside Sarawak. However, looking at it positively, this reflects their quality, capabilities and competitiveness in the wider job market.
Innovation
Tuan Speaker, let me next highlight several key innovation developments in STEM, research and technology in Sarawak. My Ministry is pleased to inform this August House that Sarawak’s innovation ecosystem continues to make encouraging progress, with achievements recorded in STEM, robotics, research and development, biodiversity, artificial intelligence (AI), semiconductors and startup development. These achievements demonstrate that our investments in innovation are increasingly translating into talent, knowledge, technology and economic opportunities.
STEM and Robotics
Sarawak’s youth continue to demonstrate their strength and capabilities in STEM and robotics, both national and abroad. This year, Sarawak recorded an unprecedented participation of 256 teams in the National Robotics Competition (NRC), ranking third nationwide in terms of overall participation. Among the notable achievements, SMK Chung Hua (CF) Miri secured four medals, including a gold medal in RoboSports Double Tennis, while SJK(C) Chung Hua Krokop emerged as the first runner-up in RoboMission Pro Primary. Both schools will advance to represent Malaysia at the World Robotic Olympiad (WRO) Final in Puerto Rico this December.
Sarawak’s achievements extend beyond national competitions. The AsaGiant Ambal team, from SMK Asajaya secured a Bronze Medal at the WRO Asia-Pacific Championship in India. Tiada orang mahu tepuk tangan... (Applause)… Susah payah kita ajar budak-budak ini…(Laughter)… Last week, Borneo International School competed at the WRO Open Championship Europe in Croatia, saya pun belum pernah pergi Croatia, dia orang ini sudah pergi and secured second place in the world RoboMission Junior category, marking a significant international achievement and bringing pride and recognition to Sarawak and Malaysia. Bravo Sarawak…(Applause)…
Tuan Speaker, building on Sarawak’s strong track record in robotics, I am proud to inform this August House that Sarawak will host the WRO Open Championship in 2027. This is a significant milestone for Sarawak and a demonstration to the continued growth of our STEM and robotics ecosystem. Sarawak has established itself as a formidable contender in robotics, having emerged as the overall champion at the NRC on 10 occasions between 2014 and 2025…(Applause)…
Hosting the WRO Open Championship in 2027, will provide a valuable opportunity to showcase Sarawak’s homegrown talent in the international stage while welcoming students, educators, coaches and robotics enthusiasts from around the world. Beyond the prestige of hosting a global competition, this event will facilitate knowledge exchange, enhance international collaboration and strengthen our STEM ecosystem, further positioning Sarawak as a regional and international hub for robotics, innovation and technology education.
Sarawak’s growing innovation capabilities are also reflected in the achievements of our start-ups. NEX EcoVentures from Sibu, emerged as the winner of the Startup World Cup Malaysia 2026, East Chapter Final. The company is advancing innovative solutions in agriculture, food innovation and the circular economy, demonstrating how homegrown start-ups can harness innovation to address real-world challenges and create new economic opportunities. Following this achievement, NEX EcoVentures will represent Malaysia at the Global Final in San Francisco this November. These achievements, spanning robotics, STEM education and innovation-driven entrepreneurship, reflect Sarawak’s growing capacity to nurture talent, develop homegrown solutions and compete on the global stage.
I extend my deepest congratulations to all our students, educators, coaches and innovators. Their accomplishments are a source of pride for Sarawak and reaffirm our commitment to developing a future-ready generation equipped not only to meet the challenges of tomorrow, but also to shape Sarawak’s future through knowledge, creativity and innovation.
Sarawak Research and Development Council (SRDC)
SRDC continues to strengthen Sarawak’s R&D and innovation ecosystem, with the SHInE International Conference 2026, held here in Kuching, attracting over 500 delegates from 20 countries, including 103 international delegates and 23 international speakers. To strengthened research-industry collaboration, SRDC has partnered with BioVerde Technologies (BVT), which supports the development of the Sarawak Bioeconomy Roadmap 2026–2035, to guide research, innovation, investment and commercialisation priorities.
In addition, SRDC is strengthening academic collaboration through Memorandum of Understanding (MoU) with i-CATS University College and UTS in joint research, talent development and knowledge exchange, while partnering with MyIPO to enhance intellectual property protection, technology transfer and commercialisation, translating research outputs into economic and societal benefits. SRDC continues to nurture young innovators through targeted programmes. The BrightSparX or BrightSparX Programme has expanded to accommodate up to 150 teams in the 2026/ 2027 cycle, supporting young innovators in developing solutions across five key areas. Additionally, 10 teams from 2025/ 2026 programme will participate in the Digi Inventors Challenge Sarawak 2026, jointly organised by SRDC and Scotland’s Digital Health and Care Innovation Centre.
Sarawak Infectious Disease Centre (SIDC)
Tuan Speaker, SIDC continues to advance Sarawak’s capabilities in infectious disease research and public health. Its RM320 million facility was 90% complete, as of August 2026, with its official launch targeted in the third quarter of 2027. Under its Disease Surveillance Programme or DSP, 13 exercises have been conducted across Southern Sarawak, reaching over 1,000 participants.
The Gedong Pangkor exercise, witnessed by the Right Honourable Premier, a few years ago, also marked the launch of SIDC’s first mobile laboratory. In 2027, the programme will expand to eight sites in Central Sarawak, including Kapit, Sebauh and Mukah, to strengthen disease surveillance and public health interventions. SIDC has also initiated a pharmacogenomic pilot study using PacBio human genome sequencing to identify genetic variants linked to adverse reactions to tuberculosis treatment, supporting more personalised antibiotic treatment based on individual genetic profiles.
On the research front, RM18.38 million has been secured from UK Research and Innovation (UKRI), in collaboration with the University of Sheffield, University of Liverpool, this is not the football team…(Laughter)…and BIOTEC-NSTDA of Thailand, to research African Swine Fever prevention and control. At the same time, SIDC will receive RM270,000, from UK-SEA Vax Hub, Proof of Concept grant, to investigate silica-based virus stabilisation for vaccine applications, strengthening its international research collaboration and R&D capabilities. SIDC continues to strengthen local scientific talent through PhD studies in Australia, supported by RM1.0 million in combined funding, and RM290,000 in external funding for specialised training in epidemiology, genomics, genomic surveillance and vaccine research in the United Kingdom.
Sarawak Biodiversity Centre (SBC)
In biodiversity and bioeconomy development, SBC continues to strengthen the link between biodiversity, traditional knowledge, research and economic opportunities. The development of the Sarawak Bioindustrial Park or SBP Central Hub in Kota Samarahan, will expand SBC’s research capabilities, and provide a stronger pathway, from laboratory discoveries to commercial applications. We expect the Central Hub to be ready by 2028. SBC’s extensive Natural Product Library will be a key resource, for the industries that will establish themselves in the park.
Bioverde Technologies (BVT)
Tuan Speaker, BVT is the commercial arm of the Sarawak Biodiversity Council and is driving efforts to translate scientific research into market-ready products and economic opportunities, including the commercialisation of LitSara, AdenoSara and MadhuSara, derived from Sarawak’s rich biodiversity. BVT is entrusted to manage the SBP, the first of its kind in the region, and has signed strategic agreements with eight industry players, with commercial valued at approximately RM82.5 million. These initiatives will help unlock Sarawak’s bioeconomy potential, as highlighted by the Right Honourable Premier in his 2027 Budget Speech, by attracting investment and developing high-value industries from our biodiversity and research capabilities.
Sarawak Artificial Intelligence Centre (SAIC)
Tuan Speaker, my ministry is also advancing AI through SAIC. The Sarawak Artificial Intelligence Blueprint, is being developed based on Sarawak’s first structured AI Readiness Survey, assessing AI adoption, data infrastructure, skills and governance across government, industry and institutions. SAIC is advancing AI applications through a grid management solution with Sarawak Energy and initiatives such as BEACON, AI for Makers, the Singapore–Sarawak Friendship AI Business Design Hackathon and AI Satellite. Its collaboration with International Business Machines Corporation, on Quantum Safe technology will also strengthen Sarawak’s digital infrastructure against emerging cyber threats.
SMD Semiconductor (SMD)
Tuan Speaker, SMD continues to strengthen the development of a skilled and sustainable local talent pool to support the growth and long-term needs of Sarawak’s semiconductor industry. The CENTEXS–SMD Semiconductor Mastery Programme has produced 45 graduates, with specialised training expanded in 2026 to meet industry needs. The Sarawak Semiconductor Flagship Programme was launched in September 2026, to strengthen talent development through coordinated education, training and industry collaboration, including the Mastery Programme, annual Sarawak IC Design Make-a-thon and IC Design Competition.
A key milestone was the unveiling of Sarawak’s first student-designed chip, demonstrating growing local IC design capabilities. To further develop local talent and expertise, IC Design Research Laboratories have been established at Curtin University Malaysia, Swinburne University of Technology Sarawak Campus, and University of Malaysia Sarawak (UNIMAS), supported by international collaboration with partners such as CSA Catapult in the United Kingdom. Further strengthening advanced talent development, this year, SMD is sponsoring an IC design engineer through Yayasan Sarawak, to undertake a four-year PhD programme at the University of Bristol to support the growth of a home-grown semiconductor talent.
Sarawak Science Centre (SSCiEX)
Tuan Speaker, I wish to update this august House that the Sarawak Science Centre has welcomed approximately 200,000 visitors since it was officially launched on the 29th of July 2026... (Applause)… Just a short time draw, I believe a lot of people now are interested in science. That is why we promote STEM. The centre has also become a destination for organised learning, having hosted 67 schools, and group visits. Sarawak Science Centre has also signed five strategic agreements with Science Centre Singapore, PETROSAINS, The Discovery Centre, Sarawak Metro, the National STEM Association, and the Sarawak Digital Economy Corporation (SDEC).
Further advancing this international outlook, Sarawak Science Centre signed an additional MoU with the National Science Museum, Thailand, during the Asia Pacific Network of Science and Technology Centres (ASPAC) Conference 2026 in Bangkok in August. This collaboration expands Sarawak’s regional network of science communication partners and creates new opportunities for exhibition and programme exchanges.
Sarawak Digital Economy Corporation (SDEC)
SDEC continues to expand Sarawak’s digital economy through STEM education, entrepreneurship, research and innovation. Its STEM supplementary programmes have reached 12,941 students, 1,010 teachers and 622 schools, while Science on Wheels 2026 reached 7,397 students across 245 schools. SDEC startup and technology acceleration programmes have supported 49 startup alumni, while more than RM10.6 million has been committed to 69 translational research projects involving 433 full-time equivalent researchers. The Borneo Animation and Games Festival 2026 also attracted approximately 23,000 visitors and delegates from 14 countries further, strengthening Sarawak’s creative and digital ecosystem.
Issues Raised by the Honourable Member of This August House
For the information of the Honourable Member for Batu Lintang, thank you for your support regarding the SAIC and our aerospace talent development initiatives.
Talent Development
I shall now highlight Sarawak’s efforts to develop a skilled and future-ready workforce to support the state’s economic growth and development. Tuan Speaker, my ministry remains committed to developing a skilled local workforce equipped with recognised qualifications and pathways to employment. Through Talent Path Sarawak and the Program Khas Bumiputera (PKB) Sarawak 2026, we continue to strengthen skills development and create clearer pathways from training to employment. Talent Path’s Train and Place initiative offers subsidised, industry-driven training that leads to recognised certification and employment opportunities. Meanwhile, the Program Latihan Kemahiran under PKB Sarawak 2026, with RM2.5 million in funding support from the Implementation Coordination Unit of the Prime Minister’s Department, aims to expand access to skills training across Sarawak.
We continue to invest in continuous skills development and professional growth to ensure Sarawakians remain prepared for changing workforce needs. Through Program Latihan Kemahiran Sarawak and Industry Continuous Professional Development (iCPD), workers and working Sarawakians are given opportunities to further develop their skills, knowledge and competencies, gain recognised skills and improve their employment prospects. Through WorldSkills Malaysia Sarawak 2026, we strengthen the capabilities of coaches, judges and instructors while enhancing the quality, consistency and professionalism of skills training and competitions. These efforts, continue to build a skilled, adaptable and industry-ready workforce. In preparing our young talent to enter the workforce, my Ministry, through Sistem Pesanan Kerjaya (SPEAK) continuously engage school counsellors across Sarawak to ensure SPM school leavers have access to information on education, skills training and employment opportunities.
My ministry together with Tabung Ekonomi Gagasan Anak Sarawak (TEGAS) continues to connect talent with opportunities through the Sarawak Career and Training Fair (SCaT Fair). The fair features STEM activities to promote interest in science and technology, alongside Pertubuhan Keselamatan Sosial walk-in interviews, they will get the job if they are qualified. This year, it attracted 32,308 visitors and over 50 exhibitors. Through the Sarawak Informal Education Recognition Programme in collaboration with the Malaysian Productivity Corporation (MPC) and strategic partners, we validate competencies, gained through work experience, self-learning and community activities, particularly in crafts, agri-food, caregiving and construction.
Centre for Technology Excellence Sarawak (CENTEXS)
CENTEXS continues to strengthen industry-driven training across key sectors, including AI and digital technologies, semiconductors, digital construction, robotics, space technology, green mining and quarrying, and gas and energy, with their leading strategic industry partners.
These initiatives enhance local technical capabilities and ensure that skills development remains aligned with emerging technologies and evolving industry needs. In the aerospace sector, the CENTEXS Aerospace Academy, established in 2024 has trained 296 trainees. Its first cohort has produced 36 graduates in Aerospace Sheet Metal and Machining Operations. All of them have received employment offers.
For the information of this august House, CENTEXS is exploring new training opportunities, in fixed-wing aircraft, helicopters, drone technology and air cargo and passenger services. This Flying Academy initiatives aim to strengthen Sarawak’s local talent pool and support the development of skilled talent for emerging and high-growth industries.
Sarawak Skills
Sarawak Skills implements industry-driven TVET programmes and workforce upskilling and reskilling. This includes pineapple cultivation programme with Lembaga Perindustrian Nanas Malaysia Negeri Sarawak. Sarawak Skills will expand its modular training and Akademi Dalam Industri programmes, while strengthening the existing competencies through Recognition of Prior Experiential Learning. In addition, the Talent Path Programme will provide specialised training in harvesting and electrical skills to equip Sarawakians with practical, industry-relevant competencies and enhance their employability.
In addition, the Advanced Automotive Training Centre will strengthen local expertise in electrical, hybrid and hydrogen-powered vehicle technologies. Together, these initiatives will continue to develop a skilled, adaptable and future-ready workforce to meet Sarawak’s evolving industry needs.
Issues Raised by the Honourable Member of This August House
Tuan Speaker, for the information of the Honourable Member for Beting Maro, Kabong, Ngemah and Murum, we appreciate your support and have taken note of your suggestion to expand TVET training in digital tech, engineering, modern agriculture and emerging industry skills to empower interior youth.
To respond to the Honourable Member for Bukit Begunan, the proposed permanent building for Sarawak Skills is at planning stage. My Ministry concurs with the Honourable Member for Ba’Kelalan on the need to strengthen youth employment and empowerment in rural areas. We hope that all relevant agencies will work together to ensure that any initiatives planned reach our youth in Lawas and Ba’Kelalan. As for the information of the Honourable Member for Tamin, we will continue to support efforts to bring guidance and recruitment programmes in rural areas.
Now, Tuan Speaker, I go to Greater Kuching Coordinated Development Agency or GKCDA.
Greater Kuching Coordinated Development Agency (GKCDA)
Allow me to provide a brief update on the GKCDA, which was established in September 2022 to accelerate development across 10 DUN constituencies in the hinterland of Kuching and Serian Divisions. With an initial allocation of RM1.5 billion, GKCDA has approved 531 projects as of 30 September 2026, of which 129 have been completed and the remaining 402 are at various stages of implementation. In this regard, I wish to express my sincere appreciation to the implementing departments and agencies for their continued commitment to advancing development in our rural communities.
Closing
Before I end, I wish to convey my sincere gratitude to all Honourable Members of this august House for their views, feedback and more importantly support towards the initiatives undertaken by my ministry. I would also like to place on record my highest regard to the Honourable Tuan Speaker, Deputy Speaker, as well as the officers and staff of the State Legislative Assembly for the smooth proceedings of this august House, except for some hiccups.
My sincere thanks also to the Honourable State Secretary, State Attorney General and State Financial Secretary as well as all Ministries, department and agencies, both state and federal, that have rendered their assistance to my ministry. Not forgetting, to all officers and staff of my own Ministry and agencies, who have worked tirelessly to ensure that work runs smoothly.
Tuan Speaker, ultimately, our shared responsibility is to ensure that the people of Sarawak especially our children and young people, have access to better educational opportunities and the skills they need to succeed in the future. With the continued leadership of the Right Honourable Premier and the support of the GPS Government, we remain committed to advancing education, innovation and talent development for the progress and prosperity of Sarawak… (Applause)…
As our young people represent the future of Sarawak, I wish all SPM and STPM candidates the very best in their examinations. May their hard work and dedication lead to excellent results and pave the way for a bright and successful future. Let us continue to work together with a common purpose and shared commitment to securing a better and brighter future for our beloved Sarawak. As the festive season is approaching, I would like to wish everyone a happy Deepavali or Diwali, a blessed and Merry Christmas, and to all a Happy and Prosperous New Year 2027. Allow me to close it with a pantun, I hope you like it:
Bendera GPS berkibar tinggi, Rakyat bersatu teguh bersama, GPS memimpin penuh berbakti, Sarawak maju,rakyat sejahtera. …(Applause)…
Indi awang, indi aseng. Tera tera.
With that, Tuan Speaker, I thank you and all Honourable Members of this august House. Thank you.
Thank you, the Honourable Minister Dato Sri Roland Sagah Wee Inn. Next, I respectfully invite the Honourable Dato Sri Haji Julaihi bin Haji Narawi, Minister of Utilities and Telecommunications, to deliver the winding-up speech. With respect, the floor is yours.
Thank you, Mr Speaker, for the opportunity to deliver the winding-up speech for the Ministry of Utilities and Telecommunications this morning.
Before I begin the winding-up speech, I would like to take this opportunity to welcome the presence of the delegation of the PBB Party from the DUN Sebuyau area, comprising fathers, youth, women and young people…(Applause)…Also the presence of the counsellors from the Sebuyau District Council...(Applause)... and further, the presence of friends from the UKM Sarawak Association alumni. Thank you for attending together…(Applause)…
First of all, I would like to record my highest appreciation to Mr Speaker for the opportunity to deliver the winding-up speech of the Sarawak Ministry of Utilities and Telecommunications this morning.
In conjunction with the 80th birthday of the Yang Terutama Yang di-Pertua Negeri of Sarawak on 10 October, I would like to record my greetings of Happy Birthday to His Excellency Tun Pehin Sri Dr. Haji Wan Junaidi bin Tuanku Jaafar, and may His Excellency always be blessed with good health, long life, and always be protected and blessed by Allah S.W.T.
The recent celebration of the 80th birthday of the Yang Terutama Yang di-Pertua Negeri of Sarawak not only expressed respect for His Excellency, but as the Head of State it also symbolises the role of the institution of the Yang di-Pertua Negeri as a symbol of the unity of the people of Sarawak, who are multiracial, multicultural and multireligious. With the improvement of infrastructure and transport connectivity, more people from all over Sarawak have the opportunity to take part in this meaningful celebration. This is among the impacts of development that have taken place in Sarawak, where people from every corner of Sarawak are able to come together to celebrate the recent birthday celebration of the Yang Terutama Yang di-Pertua.
To the Honourable Premier of Sarawak, I would like to record my highest appreciation and congratulations on the tabling of the Sarawak Budget 2027 under the theme, "Together Building Prosperity and Securing Our Futures", which places emphasis on sustainable development, high-value industries, economic diversification and the well-being of the people. Out of the total Budget 2027 amounting to RM14.845 billion, my ministry greatly appreciates the allocation of RM1.38 billion for the implementation of water supply, electricity and telecommunications projects throughout Sarawak. My ministry will ensure that projects are implemented efficiently and according to schedule for the welfare of the people.
With this allocation, Mr Speaker, the development of the utilities and telecommunications sector can be intensified and accelerated to boost the comprehensive development of Sarawak. We are confident that this effort will bring more tangible transformation to the people through better electricity and water supply as well as wider telecommunications coverage. The vision and commitment of the Honourable Premier in the development of Sarawak, including the utilities and telecommunications sector, reflect the seriousness of the GPS Sarawak Government in achieving high-income status and maintaining that status as recognised by the World Bank in 2023, although our actual target is by 2030 in line with PCDS 2030, Sustainable Development Goals (SDGs) and the principles of Environmental, Social and Governance (ESG).
My ministry records its appreciation to the Honourable Premier of Sarawak for the announcement during the tabling of the Sarawak Budget 2027 to continue the special assistance in the form of a 25% discount on domestic electricity bills throughout 2027. This special assistance, which benefits 716,000 users, means that from April to December 2026 it is allocated RM188.1 million. This special assistance will be continued throughout 2027 as announced by the Honourable Premier in the Budget, with an allocation of RM281 million. This means that, if we take into account the actual total, the discounts for 2026 and throughout 2027 that have been approved by the Sarawak Government amount to RM469.1 million until the end of 2027. This proves that the GPS Sarawak Government is very caring towards users throughout Sarawak…(Applause)…
The Sarawak Government is always concerned about the problems and needs of the people, among them providing a free water supply subsidy worth RM5.00 a month, equivalent to 11,300 litres of water. From 2020 until August 2026, this initiative has involved a subsidy amounting to RM210.4 million. If projected until the end of 2026, the total of this subsidy is estimated to reach RM222.7 million. To ensure that this RM5.00 subsidy continues to be enjoyed by the people, it will be continued in 2027, meaning throughout 2027, with an allocation of RM35 million, which will benefit nearly 600,000 domestic users throughout Sarawak. This further proves that the GPS Government is very caring towards the people throughout Sarawak... (Applause)... This subsidy reflects the concern and commitment of the Sarawak Government in reducing the burden of the cost of living so that the welfare of the people continues to be safeguarded.
Water Supply
Mr Speaker, now I will touch on the latest developments regarding water supply development in Sarawak. Complete Water Supply Ecosystem
For the information of this honourable House, water supply to the people can only be realised once the entire chain of infrastructure in the water supply ecosystem is completed, covering the water intake, water treatment plants, pipelines including main pipes, distribution pipes and communication pipes, storage tanks, booster pump stations and other related components.
If any component in this chain has not been completed, water supply cannot be channelled to the people. The entire water supply ecosystem must be fully completed first to ensure water reaches the people. Of course, completing this entire ecosystem requires careful planning and a large allocation before it can be implemented.
I am confident the Sarawak State Government is able to do it through the large allocations that have been approved so far. In terms of implementation, it has also proven effective through site visits conducted by my Ministry together with the implementing agencies, JBALB and Sarawak Water, where we could witness, see for ourselves, the progress of projects that are running smoothly, including projects under implementation.
Seeing is believing, Mr Speaker. This is likened to having fruit to wait for. We went to the site; we went to have a look for ourselves what is the latest progress on the ground. This means that when these projects are being carried out and when these projects are completed in future, the water supply we have planned can reach the people. It is just like planting a coconut tree or any tree, whether a coconut tree, dabai tree, durian or rambutan tree; we certainly expect our crops to bear fruit. If it is not planted, there is no fruit we can wait for. But now, let's say, the water projects we have implemented in the field are likened to thriving and some have already flowered.
This means that if there is no allocation from the Sarawak State Government, there will be no projects built, and there will be no water in the future. Therefore, we say there is fruit to wait for. Insya-Allah, when these water projects are completed in future, when the entire ecosystem of this water project chain is completed, we will comparatively be able to enjoy a better water supply. Insya-Allah. This is what we mean by the fruit to wait for that the Sarawak State Government has prepared today... (Applause)...
Water Supply Coverage Across Sarawak
So far, water supply coverage across Sarawak has increased to 86.1%, compared with 85.6% last year. Meanwhile, water supply coverage in rural areas has increased to 72%. To achieve full coverage and meet the increasing demand for water supply, the Sarawak State Government aims to build and upgrade 32 major water treatment plants and 2,934km of water pipe grid lines across Sarawak. So far, 10 plants and 561km of water pipe grid lines have been completed, while 22 plants and 2,373km of water pipe grid lines are being and will be implemented.
To ensure water supply security, the Sarawak State Government is developing a water grid system connecting the Southern Region to the Northern Region, in line with the Sarawak Water Supply Master Plan and the Sarawak Water Grid that we are implementing now. Meanwhile, remote areas, off-grid areas, are supplied with water through the Sarawak Alternative Water Supply, or in short SAWAS.
Water Supply Projects under the Thirteenth Malaysia Plan (RMK-13) and Alternative Funding
Mr Speaker, the Sarawak State Government has allocated a total of RM6.46 billion under the Thirteenth Malaysia Plan and Alternative Funding, involving a total of 361 water supply projects. So far, 338 projects, equivalent to 94% of water supply projects, have been completed and are under construction. The remainder are at the pre-implementation stage. For 2026, a total of RM662.7 million has been allocated to implement water supply connections under the Thirteenth Malaysia Plan and Alternative Funding.
Progress of the Water Supply Grid System in the Southern Region
Mr Speaker, next I will explain the progress status of the water supply grid system by region. The water supply grid system in the Southern Region covers the Kuching, Samarahan, Serian, Sri Aman and Betong divisions and involves the construction and upgrading of nine water treatment plants, nine major water treatment plants and the installation of water pipe grid lines with an estimated length of 1,132km.
Three major water treatment plants in the South, namely the Batu Kitang water treatment plant (Plant 2), now producing 868 million litres of water a day, Slabi, Serian producing 110 million litres of water a day, and Bayai, Sri Aman producing 53 million litres of water a day, have been completed and upgraded, while six other water treatment plants are at various stages of implementation. Among the major water treatment plants currently under construction are:
(a) Upgrading of the Batu Kitang Water Treatment Plant (Plant 4), Kuching, from the current capacity of 868 million litres of water a day to 968 million litres of water a day, and it is now at 79.1% construction progress, nearly 80% complete;
(b) Construction of the new Lundu Water Treatment Plant with a capacity of 20 million litres of water a day, with physical progress currently at 3.5% or 3.42%, approaching 3.5%;
(c) Construction of the Engkilili Water Treatment Plant in Sri Aman with a capacity of 75 million litres of water a day, with physical progress currently at 23.1%;
(d) Upgrading of the Lubau Water Treatment Plant, Betong from 30 million litres of water a day to 60 million litres of water a day, with physical progress currently at 54.9%, nearly 55%; and
(e) Upgrading of the Kaki Wong Water Treatment Plant, Betong from 30 million litres of water a day to 60 million litres of water a day, which is now at the early stage of implementation.
As for the water supply grid lines, 331km of water pipe grid lines have been completed, covering:
(a) Matang to Samariang; (b) Kuching – Bau – Lundu; (c) Kuching – Kota Samarahan – Asajaya – Sadong Jaya – Sebangan – Sebuyau – Simunjan; and (d) Saratok – Kabong.
Meanwhile, Mr Speaker, another 801km of water pipe grid lines connecting the Southern Region and further connected to the Central Region are currently and will be implemented. Among them are: (a) Lundu Sematan Regional involving Lundu – Biawak – Sematan – Telok Melano; (b) Serian Regional Phase II (Stage 1); (c) Serian Regional Phase II (Stage 2); (d) Serian – Rayang – Sebemban – Tanah Puteh – Gedong Isthmus; (e) Samalatong – Gedong Isthmus; (f) Upgrading Kuching Serian (Siburan – Serian); (g) Sri Aman Regional, entirely in the Sri Aman division; (h) Engkilili – Bayai – Sri Aman, meaning from the new Engkilili Water Plant towards the existing Bayai Plant today, and so on; (i) Roban Junction – Kabong – Lubok Nibong; (j) Betong – Pusa; and (k) Saratok Regional, entirely Saratok.
This means that the plan, the implementation of the water supply plan in the Betong division and the Betong system grid are still being implemented, and Insya-Allah, when completed, they will produce a much better and more stable water supply once completed.
Progress of the Water Supply Grid System in the Central Region
Mr Speaker, next I would like to touch on the progress of the water supply grid system in the Central Region. The water supply grid system in the Central Region covers the Sarikei, Sibu, Mukah and Kapit divisions and involves the construction and upgrading of 12 major water treatment plants and the installation of water pipe grid lines with an estimated length of 1,183km.
Four major water treatment plants have been completed in the Central Region, namely Tanjung Manis, Mukah with a capacity of 30 million litres of water a day, Basong, Mukah with a capacity of 60 million litres of water a day, Bayong, Sarikei with a capacity of 100 million litres of water a day, including Julau, Sarikei with a capacity of 5 million litres of water a day, which was upgraded in August recently. Meanwhile, eight plants are still at various stages of implementation. Among the major water treatment plants under construction and implementation are:
(a) Upgrading of the Salim Water Treatment Plant, Sibu from a capacity of 150 million litres of water a day to 300 million litres of water a day, which has now reached 93.22% physical progress. This means Sibu, Sibu City and the surrounding areas will have sufficient water supply once the water treatment plant, the Salim Water Treatment Plant, is fully completed. So, Sibu should have more than sufficient treated water supply in the very near future. Secondly, the construction, yes, let us give a round of applause to Sibu... (Applause)... In fact, this is the single largest upgrading exercise of water treatment plant that we undertake at that moment;
(b) Construction of the new Kanowit Water Treatment Plant, Sibu with a capacity of 25 million litres of water a day, which has now reached 5% physical progress;
(c) Upgrading of the Basong Water Treatment Plant, Mukah from 60 million litres of water a day to 120 million litres of water a day, which has now reached 15% physical progress. This also means that when the water treatment plant in Mukah with a capacity of 120 million litres of water a day is completed, it will be sufficient to supply treated water, clean water, to the Mukah division, Insya-Allah... (Applause)...;
(d) Construction of the new Song Water Treatment Plant, Kapit with a capacity of 20 million litres of water a day, which is now at the early stage of implementation. It has started.
Mr Speaker, as for the water supply grid lines, 186 km of water pipe grid lines have been completed in the Central Region covering the Sarikei, Bintangor, Tanjung Manis and Pulau Bruit routes. Pulau Bruit is part of the Semop area represented by one of the Manchester United fans, sitting behind me... (Laughter)... Meanwhile, another 997km of water pipe grid lines connecting the entire Central Region and further connected to the Northern Region are now and will be implemented, among them:
(a) Sarikei – Tanjung Manis (entire Sarikei); (b) Kanowit Regional (entire Kanowit); and (c) Mukah Regional Grid System (entire Mukah division).
Progress of the Water Supply Grid System in the Northern Region
Mr Speaker, now I would like to touch on the progress of the water supply grid system in the Northern Region. Excuse my slightly hoarse voice. The water supply grid system in the Northern Region covers the Bintulu, Miri and Limbang divisions and involves the construction and upgrading of 11 major water treatment plants and the installation of 619km of water pipe grid lines. For the information of this honourable House, three major water treatment plants, namely:
(a) Nyabau Bintulu Water Treatment Plant with a capacity of 354 million litres of water a day;
(b) Berawan Water Treatment Plant Limbang with a capacity of 40 million litres of water a day; and
(c) Trusan, Limbang Water Treatment Plant with a capacity of 40 million litres of water a day have been completed and upgraded in the Northern Region.
Meanwhile, eight plants are still at various stages of implementation. Among the major water plants under construction are:
(a) New Samalaju Water Treatment Plant, Bintulu with a capacity of 120 million litres of water a day, which is now at the early stage of implementation;
(b) New Lawas Water Treatment Plant, Limbang with a capacity of 20 million litres of water a day, which has now reached 1.34% physical progress; and
(c) New Trusan Water Treatment Plant, in Limbang with a capacity of 50 million litres of water a day, which has now reached 2.21% physical progress.
So, apart from the plants I mentioned earlier, we also have another water treatment plant in Lambir, which is the main supplier for Miri City. As for the water supply grid lines, 44km of water pipe grid lines have been completed, covering the estates in Niah, Suai and Trusan, Sundar. Meanwhile, another 575km of water pipe grid lines connecting the entire Northern Region are now and will be implemented. Among them are the following routes:
(a) Bintulu – Sebauh – Bakun; (b) Labang – Tubau; (c) Suai – Niah Regional; (d) Beluru Regional; (e) Trusan Regional; and (f) Lawas Regional
Sarawak Alternative Water Supply (SAWAS)
Next, Mr Speaker, I would like to touch on the Sarawak Alternative Water Supply, in short SAWAS. The Sarawak State Government also gives attention to water supply needs in interior and remote areas that are outside the coverage of the Sarawak water supply grid system.
So far, the Sarawak Alternative Water Supply, or in short SAWAS, has benefited approximately 2,600 households in 79 villages and longhouses under Phases 1 and 2. For the next phase, it is estimated that another 1,300 villages and longhouses in off-grid areas will receive water supply through the SAWAS system. The SAWAS Phase 3 project funded by the Sarawak State Government for the Sarikei division is now at the early stage of implementation, while other areas across Sarawak will be implemented in stages.
In addition, Mr Speaker, eight alternative water supply system projects under the Ministry of Rural and Regional Development (KKDW) have been approved for implementation in the Sri Aman division, Sarikei division, Sibu, Kapit, Mukah, Bintulu, Miri and Limbang, which are now at the design stage.
Acute Water Treatment Plant Initiative
Mr Speaker, now I would like to touch on the Acute Water Treatment Plant Initiative. As a transitional measure before the completion of the water grid system to cater for water shortages in critical areas, my Ministry, through the Sarawak Rural Water Supply Department (JBALB), has implemented the Acute Water Treatment Plant Initiative. So far, a total of 20 Acute Water Treatment Plants have been operating across Sarawak, including the newly completed plants in Sebangan, Samarahan division, and Rantau Panjang, Sibu division. This has increased the capacity of water treatment plants using the existing Acute System in Sarawak by 109.7 million litres a day.
Meanwhile, five more Acute Water Treatment Plants being built, including in Sebuyau (Samarahan division), Balai Ringin (Serian division), Pakan (Sarikei division), Debak (Betong division) and Suai (Miri division), are at various stages of implementation.
Progress of the Upgrading and Replacement of Old/Dilapidated Pipes Programme
Mr Speaker, now I would like to touch on the progress of the programme to upgrade and replace old or dilapidated pipes across Sarawak. In an effort to upgrade or improve the pipeline network and reduce the rate of Non-Revenue Water (NRW) in Sarawak, the Sarawak State Government has implemented a programme to upgrade and replace old and dilapidated water pipelines totalling 2,740km, involving an allocation of RM1.1 billion. This is a budget and approval of the GPS State Government itself... (Applause)... which is being implemented in phases over a five-year period and is now being carried out.
So far, 44 projects have been completed, 38 projects are at various stages of construction, and the remaining 140 projects are at the pre-contract stage. My Ministry targets for all remaining projects to begin construction in the second quarter of 2027.
Handover of Rural Water Supply (BALB) Projects Funded by the Federal Government to the Sarawak State Government
Mr Speaker, earlier I touched on the projects funded by the Sarawak State Government; now I must also touch on the rural water supply projects funded by the Federal Government. The handover of Rural Water Supply (BALB) projects funded by the Federal Government to the Sarawak State Government. I place on record my appreciation and thanks to the Federal Government for agreeing to hand over the implementation of all Rural Water Supply (BALB) projects in Sarawak to JBALB starting 17 March 2026.
For the information of this honourable House, all procurement and contract management procedures for rural water supply projects valued up to RM50 million are decided at the Sarawak level. Meanwhile, for contract management of rural water supply projects exceeding RM50 million, reference still needs to be made to the Federal Government.
Therefore, I urge the Federal Government to consider that the same procurement and contract management procedures be applied to the procurement of projects valued above RM50 million, in order to expedite the implementation of rural water supply projects in Sarawak. This means the Sarawak State Government requests full authority from the Federal Government so that all rural water supply projects are decided entirely at the Sarawak level without needing to refer to the Federal Government... (Applause)...
This will expedite the implementation process. We need the authority and we need the full authority badly, Mr Speaker, so that any water problems related to the implementation of Federal funded project will be expedited and will be implemented smoothly together with our own Sarawak State funded projects. So, I believe my fellow Sarawak State Assemblymen also agree. Agreed, yes? ... (Applause)...
Water Supply Systems for Housing, Commercial, Industrial, Government Premises and Related Projects
Mr Speaker, to ensure stable water supply pressure and sufficient capacity in the future, the provision of a complete water supply system is a mandatory requirement for all land development projects, especially housing, commercial, industrial projects, government premises or government buildings and other related projects.
This system covers water storage tanks, booster pump stations and related facilities according to the technical requirements stipulated, as well as the requirements of Sarawak Energy for site preparation and electricity connection systems. This means, we want it to be properly prepared and planned, so that future supply of water to all these projects will be uninterrupted, so the proper planning must be there at all times.
Mr Speaker, this requirement must be taken into account from the planning stage. Therefore, applicants or developers must obtain verification from the Sarawak Rural Water Supply Department (JBALB) or Sarawak Water on the proposed system design and the suitability of the site for the facilities to be provided before the land development application is submitted to the Lands and Surveys Department and subsequently to the State Planning Authority for consideration and approval. Consequently, verification from JBALB or Sarawak Water is also one of the important conditions set for planning approval and must be complied with before submitting the engineering plan for consideration by the Engineering Plan Committee (EPC).
So, I hope this will be observed, this will be followed strictly by all those developers concerned in the near future. Furthermore, Mr Speaker, I would like to take this opportunity to remind all owners of private and commercial buildings or premises to ensure that water storage tanks on the roof or on the rooftop are maintained and functioning well to meet their respective water needs, especially during peak periods and when water supply disruptions occur. Please do not bypass your rooftop tank at your respective houses because we know there are cases whereby they bypass, leaving the rooftop tank or the rooftop tank not functioning, empty. So, when water supply disruption occurs, they do not get water supply. Please observe that for your own benefit in the near future.
Security of Raw Water Sources
Mr Speaker, next I would like to touch on the security of raw water sources. Climate change poses a challenge to water supply security in Sarawak. Erratic rainfall distribution and prolonged dry seasons can affect raw water sources. Therefore, comprehensive early planning is needed to ensure water supply remains sufficient and continuous for the people.
In this regard, my Ministry is studying the potential to optimise existing water sources through the development of water reservoirs and the implementation of raw water transfers, raw water transfers in several identified areas in line with the Sarawak Integrated Water Resources Management 2009. This initiative aims to increase raw water supply capacity and strengthen the resilience of Sarawak's water supply system in facing climate change and future water needs.
IWA World Water Congress and Exhibition (IWA WWCE) 2028
Mr Speaker, Sarawak has officially become the host of one of the largest water congresses and exhibitions, named the IWA World Water Congress & Exhibition 2028, which will take place in Kuching, Sarawak in October 2028, during the official handover of the hosting rights for the IWA World Water Congress & Exhibition 2026 in Glasgow, United Kingdom, which took place on 8 October 2026 recently.
The hosting in Kuching in 2028 will be historic as the first hosting of the congress in the ASEAN region... (Applause)... I want to share this a little because when the IWA Congress & Water Exhibition is held biennially, we made a bid where three years ago, the bid we made involved seven countries, and then it was short-listed to two countries. And thankfully, when it was short-listed to two countries, Brazil and Malaysia, Malaysia, which tried its luck using Kuching as host, was chosen and succeeded in obtaining the hosting venue for 2028. This is an achievement for Sarawak, Malaysia. Please give a round of applause... (Applause)... And I also want to share this, which is why we need to build BCCK 2, because the requirement is that we must provide a space that doubled the size of the current BCCK. Therefore, we have met the requirement to build BCCK 2 to accommodate the needs required by the IWA to host the event in 2028.
Mr Speaker, this biennial congress brings together experts and industry players in water and wastewater from all over the world for the sharing of knowledge, experience and technology. Sarawak's participation through the Sarawak Pavilion at the Glasgow congress recently also became a strategic platform to promote Sarawak as the host for the IWA World Water Congress & Exhibition 2028. The Sarawak State Government through my Ministry will give full commitment to ensure the hosting of this international conference is carried out smoothly and successfully, Insya-Allah.
Electricity Supply
Mr Speaker, now I would like to touch on electricity supply. For the information of this honourable House, the major towns in all divisions in Sarawak are now fully connected to the grid system following the completion of the electricity transmission line to Limbang and Lawas. This electricity transmission grid system has also become a source of supply for the development of electricity infrastructure in rural areas. Many people did not know, before this, the Limbang division involving the Lawas and Limbang districts was not connected to the grid. It only used gensets. Many people did not know. But now, both Lawas and Limbang district, which is the whole part of Limbang division, is fully connected to the state electricity grid. This is another milestone, another success by our utility agency, Sarawak Energy Berhad. Congratulations to Sarawak Energy Berhad. ...(Applause)... For interior areas not yet connected to the grid, electricity supply will continue to be provided through the off-grid system, the Sarawak Alternative Rural Electrification Scheme, in short SARES. The Sarawak State Government is committed to supplying 24-hour electricity to every corner of Sarawak.
The Sarawak State Government is now getting closer to full electricity supply coverage through the implementation of the Sarawak Electricity Masterplan (SEM), in line with PCDS 2030. This effort includes increasing generation capacity, expanding the grid and implementing off-grid systems to ensure a stable, quality, affordable and sustainable electricity supply. For rural areas, the Sarawak State Government is continuing grid connection projects and SARES off-grid systems, including replacement of batteries and key components to ensure a 24-hour electricity supply. The SARES off-grid system will also be upgraded to connect to the grid system one day in the future.
Sarawak Electricity Generation and Demand
Mr Speaker, now I would like to touch on the generation and demand for electricity in Sarawak. At present, Sarawak's electricity generation capacity is 5,928 MegaWatt (MW) compared with demand of around 4,800 MW. In terms of the current generation capacity mix, hydro contributes 60%, equivalent to 3,558 MW, solar 1%, equivalent to 50 MW, gas 22%, equivalent to 1,326 MW, coal 15%, equivalent to 891 MW, and diesel 2%, equivalent to 103 MW.
New Generation
The Government targets a generation capacity of 10,000 MW by 2030, and 15,000 MW by 2035. 10,000 is equivalent to 10 gigawatts, while 15,000 is equivalent to 15 gigawatts. By 2035, at least 60% of energy sources will come from renewable energy. To achieve this target, three major projects with a capacity of 3,285 MW are being implemented, namely:
(a) Baleh hydroelectric with a capacity of 1,185 MW expected to begin operation in the fourth quarter of 2029;
(b) Samalaju Combined Cycle Power Plant with a capacity of 1,500 MW – Blocks 1 and 2 with a capacity of 1,000 MW have reached a current physical progress of 58% and are expected to begin operation in the second quarter of 2027, while Block 3 with a capacity of 500 MW will be implemented in the first quarter of 2027; and
(c) Miri Combined-Cycle Gas Turbine, 500 MW, now has physical progress of 63% and is expected to begin operation in the fourth quarter of 2027.
My Ministry, through Sarawak Energy, is committed to implementing Large Scale Solar (LSS) projects with a total potential capacity of 1,500 MW. Meanwhile, Mr Speaker, other projects under study are as follows:
(a) Cascading Power Sources (CPS) with a potential capacity of 3,000 MW; and
(b) Kuching Combined Cycle Power Plant (CCPP) with a potential capacity of 5,000 MW.
These are under study.
Rural Electricity Supply (BELB)
Mr Speaker, now I would like to touch on Rural Electricity Supply (BELB). The Sarawak State Government has provided an allocation of RM2.7 billion under the Thirteenth Malaysia Plan and Alternative Funding since 2018 to implement 218 BELB projects. Of that total, 192 projects, equivalent to 88.1%, have been completed and benefited almost 60,000 households, while the remaining 26 projects are currently being implemented.
Mr Speaker, for 2026, a total of RM40.5 million has been allocated to continue the implementation of rural electricity supply projects. This means that a lot of allocations have been and are being provided by the Sarawak State Government, yet they are still at various stages of implementation, and our hope is that these projects can be implemented smoothly because our aim is to light up the whole of Sarawak including rural areas across Sarawak. This is the aspiration of the GPS Sarawak State Government.
Replacement of SARES (Sarawak Alternative Rural Electrification Scheme) Batteries
Mr Speaker, a total of RM88.6 million has been allocated for the replacement of batteries and key components at 223 SARES stations across Sarawak. So far, 85 stations have completed their replacement, 29 are being implemented, and 109 are in planning. The entire replacement works are expected to be completed in the fourth quarter of 2028.
Additional and Late Applicant Fund (ALAF)
For the ALAF Phases 1 to 4 programme, a total of RM315 million has been allocated for 21,073 households across Sarawak. Of that total, 20,627 households, equivalent to 97.9%, have been completed across Sarawak.
The implementation of ALAF Phase 4 is now nearing its end, while Phase 5 will follow shortly. To continue ALAF or the implementation of ALAF Phase 5, an allocation of RM120 million has been approved by the Sarawak State Government, which will benefit 5,000 households across Sarawak out of more than 17,000 applications received so far. The remaining more than 12,000 applications that cannot be implemented in Phase 5 will still be continued in Phase 6 and subsequently. After this winding-up speech, I will distribute the ALAF status to all relevant representatives of the people to share the latest development information of their respective areas. I will distribute this letter.
Enhancement of the Electricity Supply System
Mr Speaker, to improve the reliability of electricity supply especially in rural areas, Sarawak Energy has implemented the construction of Medium Voltage Covered Conductor (MVCC) lines, Double Circuit Monopole lines, new 33/11kV substations and upgrading of transformers. So far, 301km of MVCC lines worth RM189 million have been completed in Mukah, Sibu, Sarikei, Kapit, Bintulu and Miri, which have improved the quality and stability of electricity supply in those areas comparatively.
The Sarawak State Government also approved an allocation of RM150 million for the Samarahan division and RM198 million for the Betong division to upgrade electrical infrastructure in both divisions. For the project in the Samarahan division, the installation of 1.8km of submarine cable near the Batang Sadong Bridge has been completed and began operating in September last. I had the opportunity with my colleagues from Sadong Jaya and Sarawak Energy to witness the work done on site, recently. To witness ourselves, the work is really done, and it is done, Mr Speaker.
Meanwhile, the work of erecting electricity poles is being actively carried out along the road route from the Asajaya district towards the Batang Sadong Bridge, and then to the Sebuyau, Simunjan and Gedong areas. Out of the total 1,600 poles, 611 electricity poles have been completed and installed in the areas I mentioned in the Samarahan division earlier. For the Betong division, the Kabong/Roban 33/11kV Substation project is now at the final stage of preparing the scope of work. The procurement or tender process will begin in November this year and the physical works are expected to begin in the second quarter of 2027. Not long now.
Apart from allocations from the Sarawak State Government, Sarawak Energy, our utility agency, has also spent RM10.2 billion from 2020 to 2025 for the construction of electrical substations, distribution lines, transmission lines and the increase of capacity and improvement of existing electricity supply systems for the whole of Sarawak. This is a big amount incurred by Sarawak Energy. Just because we want much better and reliable and stable supply of electricity statewide. So, I must say thank you very much Sarawak Energy for your great effort...(Applause)...
Sarawak Grid Transmission System
Mr Speaker, the development of the 275kV Northern Grid spanning approximately 359km has enabled grid connection to Lawas on 4 December 2025 and Limbang on 31 July 2026, as I mentioned earlier. The Sarawak–Sabah grid connection, the Sarawak grid connection to Sabah through Lawas, also began operating on 13 December 2025.
The 500kV transmission line connecting Bunut, Similajau, Mapai and Tondong was completed on 21 August 2025 and is operating at 275kV as the second backbone of Sarawak's transmission system.
The Kuching Network Reinforcement (KNR) 275kV project, with an estimated cost of RM3 billion, is also being implemented to strengthen electricity supply in the Kuching division and the Samarahan division, namely in the Southern Region. KNR Phase 1, covering Entingan – Tanjong Bako, is expected to be completed in the second quarter of 2028. The scope of work for KNR Phase 1 includes:
(a) 275kV Entingan B Substation with current physical progress at 30.3%; (b) 275kV Tanjong Bako Substation with current physical progress at 21%; and (c) 275kV Entingan B to Tanjong Bako transmission line with current physical progress at 77.5%.
Overall KNR Phase 1 progress is 32.2%.
Mr Speaker, KNR Phase 2, covering Demak Laut – Santubong, is under feasibility study, expected to be completed in the first quarter of 2027, and construction is scheduled to begin in the fourth quarter of 2028. This project also supports the development of the Tanjung Embang area and the Kuching Low Carbon Hub. So, meaning this is our long-term planning in tandem with the development of Tanjung Embang area. So, we are very proactive on this and it is for the good of Sarawak in the near future.
Renewable Energy Development
Mr Speaker, now I would like to touch on the development of renewable energy. In line with the Sarawak Energy Transition Policy (SET-P), Sarawak continues to expand renewable energy development through hydro, solar, Cascading Power Sources (CPS), Pumped Storage Hydropower and biomass. For Pumped Storage Hydropower (PSH), studies are being carried out in Bakun, Murum and Padawan.
So far, Sarawak Energy has signed Power Purchase Agreements (PPA) with nine Independent Power Producers (IPP) for solar projects with a total capacity of 1,450MW at several locations, involving eight Ground Mounted Solar projects and one floating solar project.
For the development of Cascading Power Sources (CPS), a total of 28 local and international companies have participated in the Request for Proposal (RFP) for five river basins that have been identified, namely Tutoh, Belaga, Danum, Balui and Gaat. All these applications are still in the first evaluation phase. So, it is now at the stage of first evaluation.
Net Energy Metering (NEM), Photovoltaic Installation for Self-Consumption (SELCO)
Mr Speaker, so far, a total of 900 NEM systems with a total capacity of 7 MW have been operating, compared with only 40 NEM systems operating in 2025. Meaning, that is a great increase in the operation of NEM systems as of now.
Mr Speaker, owners of landed residential properties that have not yet been equipped with rooftop solar photovoltaic (PV) systems are eligible to receive a subsidy of between RM8,000.00 and RM12,000.00 for the installation of solar PV systems under the Net Energy Metering (NEM) scheme, depending on the capacity of the system installed.
For this purpose, Sarawak Energy has allocated RM10 million on a first come, first served basis to homeowners who install solar PV systems between 1 January 2025 and 31 December 2026, subject to the conditions that have been set. In addition, five Photovoltaic Installation for Self-Consumption (SELCO) systems with a capacity of 1.6 MWp have been operating, while another 12 systems with a capacity of 4.9 MWp are being implemented.
Export of Electrical Energy
Mr Speaker, now I would like to touch on the export of electrical energy. We are very fortunate because Sarawak is blessed with abundant natural resources and has great potential to be utilised for electricity generation from various sources. Our electricity generation capacity is not only sufficient to meet domestic demand in urban and rural areas, but also allows surplus energy to be exported to neighbouring countries. Meaning that we have more than sufficient to meet the local demand, then we export. I can assure you we have more than sufficient, that's why exporting energy abroad is another source of revenue for Sarawak in the near future. In fact, it is now, Mr Speaker.
This energy export will generate additional income for Sarawak, at the same time strengthening Sarawak's position as a regional energy hub and supporting continuous efforts to drive socio-economic development and improve the prosperity of the people. Sarawak continues to strengthen its role as the Battery of ASEAN through the development of the Borneo Power Grid and the ASEAN Power Grid. At present, Sarawak exports an average of 100 MW to West Kalimantan and 30 MW to Sabah.
The Government also plans to export electricity to Brunei with at least 30 MW, Singapore not. I repeat. The Government also plans to export electrical energy to Brunei with at least 30 MW, to Singapore not exceeding 1,000 MW and to Peninsular Malaysia not less than 1,000 MW. The connection project to Brunei is still under negotiation and feasibility study, Singapore is at the submarine cable survey study, while for Peninsular Malaysia it is in early-stage discussions.
Gas Distribution
Now, I would like to touch on gas distribution. Next, I will touch on gas distribution. For the information of this honourable House, Sarawak has the largest natural gas reserves in Malaysia, namely between 43 and 46 trillion Standard Cubic Feet, covering approximately 60% of the country's total natural gas reserves.
Therefore, the Sarawak State Government, through PETROS, is actively implementing the Sarawak Gas Roadmap (SGR), which focuses on the development of four strategic hubs in Miri, Bintulu, Samalaju and Kuching. This plan aims to increase domestic gas utilisation from the current 7.1% to at least 30% by 2030, with gas demand projected to reach 1.2 billion Standard Cubic Feet per Day. In line with the Malaysia Agreement 1963 (MA63), the Oil Mining Ordinance 1958 (OMO 1958) and the Distribution of Gas Ordinance, 2016 (DGO 2016), the appointment of PETROS as the sole Gas Aggregator for Sarawak strengthens Sarawak's authority in carrying out procurement, supply, distribution and sale of natural gas as well as infrastructure development that will increase domestic gas utilisation.
Mr Speaker, contrary to what has been constantly portrayed in the media, Sarawak's position is not about taking over PETRONAS' role, but about Sarawak's rights over the distribution of gas and utilising part of our gas resources to implement the Sarawak Gas Roadmap (SGR) and strengthen Sarawak's energy security. Sarawak continues to be a partner in national progress, working collaboratively with the Federal Government and PETRONAS to strengthen Malaysia's economic growth. Our intention is to ensure that Sarawak can capture value from its gas resources, attract new investments to contribute meaningfully to Sarawak's development, while continuing to support the nation's broader energy needs in the near future.
Mr Speaker,
Increasing Gas Utilisation under the Sarawak Gas Roadmap (SGR)
Among the major projects and initiatives currently being implemented under the Sarawak Gas Roadmap are as follows:
(a) The 500 MW Combined-Cycle Gas Turbine Project in Miri, which has reached 63% physical progress and is expected to begin operation by the end of 2027, with gas consumption of 77 million Standard Cubic Feet per Day;
(b) The 65km Kidurong-Samalaju Gas Pipeline Project has reached 96% physical progress and is expected to be completed by the end of 2026, with a gas supply capacity of 300 million Standard Cubic Feet per Day. I had the opportunity together with my officers from the Ministry, PETROS, Sarawak Energy visiting the site recently at Kidurong and Samalaju area, Mr Speaker. All these initiatives, sorry.
(c) The Gas to Bintulu Expansion Project valued at RM100 million has been implemented in phases and has the potential to benefit more than 120,000 households by 2030;
(d) The Gas Direct to the Kitchen initiative in Miri has supplied piped natural gas to more than 1,214 households and is expected to benefit 3,000 households when fully completed;
(e) The Kuching Low-Carbon Hub spanning 15,000 acres has the potential to attract investment of RM300 billion and is expected to create 180,000 job opportunities by 2035;
(f) The Sarawak Virtual Pipeline System (VPS) Project, which enables the transportation of Liquefied Natural Gas (LNG) from Bintulu using special trucks without the construction of physical pipelines, has now been completed in Kuching; and
(g) The Adong Kecil West (AKW) Project, which achieved first oil production in July 2026, is expected to achieve gas production in 2027, with gas output of up to 20 million Standard Cubic Feet per Day.
Mr Speaker, all these initiatives will strengthen Sarawak's gas infrastructure and support the target of domestic gas utilisation of at least 30% by 2030. The increase in utilisation from 6% to 7.1% previously was contributed by the full operation of the Sarawak PETCHEM Sdn. Bhd. plant in Bintulu at the end of 2025. This methanol project has succeeded in increasing job opportunities for more than 1,000 people, comprising local children in Sarawak. Just imagine, an increase of more than 1% can contribute to more than 1,000 job opportunities. Just imagine, if we could utilise up to 30%, that will be very massive for Sarawak in the near future. This is the long-term planning by the Sarawak Government.
Mr Speaker,
Supply of Subsidised Liquefied Petroleum Gas (LPG) Cylinders
PETROSNiaga Sdn. Bhd. will continue to ensure that the supply of subsidised LPG cylinders is sufficient for household use across Sarawak through its distribution network consisting of 65 distributors and more than 300 sub-dealers. I repeat here, yes, PETROSNiaga will continue to ensure that the supply of subsidised LPG is sufficient for household use across Sarawak through its distribution network consisting of 65 dealers and more than 300 sub-dealers.
So far, there are approximately 1.8 million red-coloured subsidised PETROS LPG cylinders available in the market, with the monthly capacity provided by PETROSNiaga being 700,000 cylinders a month. Meaning that 700 LPG cylinders are in circulation every month, Mr Speaker, with a total of RM1.8 million LPG cylinders in circulation.
For the information of this honourable House, the exchange process for yellow subsidised LPG cylinders, which people call SHELL, not SHELL, yes, MYGAZ, yes. Yellow cylinders, yes, to subsidised LPG cylinders in red, PETROS, on a one-to-one basis, free of any additional charge or still free, is still continuing. I know some users rarely cook. Some cylinders have been used for years until they run out. They are not aware that they can change to the red cylinder. So, you are still allowed to change one-to-one basis. There is no limit to changing from yellow to red PETROS LPG cylinder. Mr Speaker…(Interruption)…
Will you take it, Yang Berhormat Menteri? Interception.
Sorry? Sorry?
Thank you, Tuan Speaker and thank you, Honourable Minister. Just now you were mentioning about the exchange of the yellow tong gas especially you only mentioned about MYGAZ, but apparently in the market, they are still SHELL gas tong, yellow SHELL gas tong that which are required exchange and on the 9th of September.
We did make a request to PETROS for the exchange of these three yellow SHELL gas tongs at 29, Main Bazaar but the MIN SOON LPG workers refused to take it. So, can Minister please enlighten this House whether the exchange also extend to SHELL yellow tong gas instead of just MYGAZ only. I hope that this matter can be solved once and for all. Because otherwise we have been keeping contacting the hotline and also the MIN SOON service provider, but it seems that this matter cannot be solved. Thank you, Minister. Please enlighten us.
Thank you, thank you Pending. In fact, if we go to history, initially the yellow one was owned by SHELL. But 10 years ago, more than ten years ago, the business was taken over by MYGAZ. That's why I was saying that that yellow cylinder should be owned by MYGAZ. No more SHELL. It was taken over by MYGAZ more than ten years ago. So, what happen in the market transaction, I do not know.
But if I may say here, we are very kind-hearted. GPS Government is very kind-hearted, I tell you…(Applause)… We still allow; we still allow the changing of one-to-one without any charges for those who have yellow gas cylinder to change to red PETROSNiaga on LPG gas cylinder. You are welcome. But I just want to caution you, it doesn't belong to SHELL anymore. I am sure you are very aware about it because I remember you did try to promote MYGAZ at one time. Sorry, with due respect, that it was taken over by MYGAZ already. But we are very kind-hearted. GPS Government is very kind-hearted. We will allow it to change. No problem, okay. I hope that is very clear.
Mr Speaker,
Implementation of ISO 29001 in the Sarawak Gas Sector
For the information of this august House, in terms of governance and safety in the gas industry, my Ministry has set ISO 29001 certification (Quality Management for Petroleum, Petrochemical and Natural Gas Industries) as a requirement for new applications and renewals of gas industry licences. This measure aims to ensure compliance with international standards in terms of quality, safety and risk management, in line with the principles of ESG and SDGs.
To date, a total of 36 gas industry players in Sarawak have been identified, compared with 29 previously, of which 21 have successfully obtained ISO 29001 certification. Meaning that the response from those gas players in the market that we have identified to date, there are 29 of them and 21 has obtained the certification as required by the Ministry because this is the international standard especially in term of safety and quality ya. So, that is among the matters concerning gas.
Mr Speaker, now I would like to touch on telecommunications.
TELECOMMUNICATIONS
Next, I would like to touch on the latest progress in telecommunications coverage and the space and satellite industry in Sarawak. Let me repeat, next I would like to convey the latest progress regarding telecommunications coverage and the space and satellite industry in Sarawak.
Spectrum Management
Mr Speaker, the radio frequency spectrum is a strategic resource in the development of the telecommunications sector, particularly for expanding mobile network coverage and improving service quality. At present, radio frequency spectrum management falls under the exclusive jurisdiction of the Federal Government.
So, I just would like to share with my colleagues in this august House, probably the public, that spectrum management is still exclusively under the jurisdiction of Federal Government. So, we have to work closely with Federal Government. So, that also affect our coverage in terms of telecommunication in Sarawak. So, I want to make it clear, it is still under the jurisdiction of Federal Government.
Accordingly, Mr Speaker, the Sarawak Government is of the view that greater involvement in spectrum management is very important to ensure that telecommunications development can be implemented in accordance with Sarawak's needs and priorities. This includes management rights over certain spectrum bands that have not yet been fully utilised, or underutilized spectrum bands.
So, we still have underutilized spectrum bands. So, we are looking if it could be, one day allocated to Sarawak so that we could improve our telecommunication and internet coverage in Sarawak in the near future.
These management rights will give the Sarawak Government room to plan spectrum use more strategically, accelerate the expansion of coverage to rural areas and support the development of new communication technologies. For example, the implementation of the Sarawak Rural Broadband Network (MySRBN) plays an important role in bridging the digital divide and ensuring that rural communities in Sarawak do not fall behind in the flow of digital economic development. However, the increase in internet use and growing demand have created an urgent need for additional spectrum to overcome network congestion and ensure that existing capacity can meet the needs of users, which continue to grow from time to time.
Accordingly, Mr Speaker, my Ministry is actively working to secure additional spectrum allocation to strengthen the capacity, stability and quality of the MySRBN network and ensure affordable and reliable internet access for more residents in rural areas. I, and my fellow Honourable Members of this august House, will certainly agree and support me so that we can obtain more spectrum management rights so that rural areas receive better coverage in the future…(Applause)…
Mr Speaker, this effort is important to meet the growing network needs, open up opportunities in education, entrepreneurship and digital services, and ensure that MySRBN remains sustainable in supporting Sarawak's aspiration to become a developed state based on the digital economy by 2030.
Therefore, the Sarawak Government calls on the Federal Government to consider devolving management powers over certain spectrum bands to Sarawak through an appropriate mechanism. As part of the territory of Malaysia, Sarawak is capable of playing an effective role in strengthening the nation's spectrum management more effectively and responsively to local needs.
Now, Mr Speaker, I would like to touch on the space industry and satellite technology.
Space Industry and Satellite Technology
For the information of this Honourable House, the Sarawak Aerospace Advisory Council (SAAC), chaired by the Honourable Premier of Sarawak, was established on 16 February 2026 to provide strategic direction and guidance in driving the development of Sarawak's aerospace and outer space sector, in line with current developments in the global industry. My Ministry and the Sarawak Multimedia Authority act as the secretariat of the Sarawak Aerospace Advisory Council, or SAAC.
Meanwhile, the Sarawak Space Agency (SSA) was established on 14 April 2026. The Sarawak Space Agency is responsible for leading, coordinating and facilitating the development of the aerospace and outer space sector in Sarawak through strategic planning, research and development (R&D), policy advisory services, industrial development, strategic cooperation and the implementation of initiatives related to the sector.
Internet Coverage in Sarawak
As of September 2026, 94.5% of settlements in Sarawak have internet coverage, while the remaining 5.5% continue to be focused on through the construction of telecommunication towers and the use of satellite technology based on a fit for purpose approach. The Sarawak Government is committed to expanding coverage and improving the quality of telecommunication services through various initiatives, including strengthening 5G networks, improving coverage in blindspot areas and developing new digital infrastructure to support Sarawak's economic growth.
Sarawak Linking Urban, Rural and Nation (SALURAN)
Under the Sarawak Linking Urban, Rural and Nation initiative, in short (SALURAN), the Sarawak Government has allocated RM2.3 billion for the development of telecommunication infrastructure throughout Sarawak. Through the Sarawak Multimedia Authority Rural Telecommunication (SMART) project, a total of 618 towers have been completed and are operational, including 17 repeater towers and one commercial tower.
Sarawak Rural Broadband Network (MySRBN)
Through the Fixed Wireless Broadband (FWB) MySRBN and Home Fiber MySRBN XL services, more than 56,000 premises or buildings have been connected to internet services as of September 2026. This achievement will continue to be enhanced, with SDEC targeting approximately 60,000 premises to be connected to MySRBN internet services by the end of 2026. At the same time, coverage of the high-speed MySRBN XL broadband service will continue to be expanded in stages, in line with the activation of new sites to enable more rural premises to enjoy access to high-speed internet services in their own homes.
Progress of the National Digital Network Initiative (JENDELA)
Now I would like to touch on the progress of the National Digital Network Initiative (JENDELA). Mr Speaker, all 636 towers of the Phase 1 National Digital Network (JENDELA) under the Malaysian Communications and Multimedia Commission (MCMC) have become operational with 4G services.
To expand internet coverage in rural areas of Sarawak, the implementation of JENDELA Phase 2 Batch 1, covering 350 sites through the construction of telecommunication towers and the provision of satellite WiFi services, is expected to commence in the first quarter of 2027. So, this is the first batch of JENDELA Phase 2 that will commence implementation in the first part of 2027. In fact, it was announced recently by the visit of Minister for Communication to Sarawak.
The final locations of these 350 sites are being detailed by the Malaysian Communications and Multimedia Commission (MCMC), in cooperation with Sarawak through the Ministry of Utilities and Telecommunications and the Sarawak Multimedia Authority. So, we are going into details on where are the actual site, 350 locations that have been approved by MCMC. So, this will make it easier to coordinate so that there will not be any overlapping in the near future.
Implementation of 5G
For the information of this Honourable House, a total of 576 sites of the first 5G network by Digital Nasional Berhad (DNB) are operational. Meanwhile, for the Second 5G Network implemented by U-Mobile, 511 of the 513 sites have been completed, with 491 sites operational and the remainder to be fully operational by the end of this year.
Monitoring and Performance Evaluation of Telecommunication Networks
Next, I would like to touch on the monitoring and performance evaluation of telecommunication networks. For the information of this Honourable House, as of September 2026, MCMC has conducted Mobile Network Measurement tests at a total of 706 locations throughout Sarawak to monitor network performance and assess the level of service providers' compliance with the Mandatory Standards for Quality of Service (MSQoS).
Following the results of this monitoring, MCMC has issued a total of 78 compliance directive notices to telecommunication service providers to address the non-compliance identified and ensure that improvement actions are carried out within the stipulated time. Meaning that MCMC has issued 78 notices to the service providers to ensure that they strictly follow the quality of services as required by MCMC. So, I think this is ongoing process.
The Sarawak Government will continue to work with MCMC and telecommunication service providers to address recurring quality of service (QoS) issues, particularly in areas that frequently receive user complaints and experience unsatisfactory network performance.
So, maybe, I just would like to make it clear here lah. For example, online transactions, if I may add here, online transaction is amongst the best practices that should be followed. For example, by banks or petrol service stations, they must use fixed line as the main line. Fixed line in this case, UNIFI as the main line to enable stable online transactions especially when working with the subsidies provided by the government, and mobile services as back-up.
So, if any party uses both mobile services, and it cannot meet what is required by online transactions, then this is what can happen. So, I hope all those who carry out online transactions, including petrol service stations, please, please install fixed line services, so that there is no interruption in trying to get the subsidy given by the government. Because, if you installed both mobile services as the main line and back-up services, they are bound to be interruption. But the perception is, if there is any slight interruption, people will look at the authority either MCMC or in Sarawak, they may look at our SDEC or Ministry of Utility and Telecommunication. So, please abide by the best practice of online transactions. So, there will not be any interruption in the near future.
Development of Undersea Cable Infrastructure
Mr Speaker, now I would like to touch on the development of undersea cable infrastructure. For the information of this Honourable House, the MADANI Undersea Cable Programme (SALAM), with a length of 5,582km and an allocation of RM2 billion under Budget 2026, will enhance digital connectivity between Peninsular Malaysia, Sarawak and Sabah and increase the capacity and resilience of the domestic network.
My Ministry, through SDEC, is enhancing Kuching's potential as an International Digital Gateway that provides a direct route from Sarawak to the global network, through the development of a Cable Landing Station (CLS) for undersea cable networks, including the South-East Asia Hainan-Hong Kong Express (SEA-H2X) cable system.
Therefore, Mr Speaker, a Memorandum of Understanding between SDEC and Converge ICT Solutions, a Philippine telecommunications company, was signed on 5 October 2026 as a joint commitment to the implementation of SEA-H2X. This move is set to open investment opportunities in artificial intelligence (AI) technology and Cloud Services in Sarawak.
SACOFA Network Modernisation Programme
Mr Speaker, the SACOFA Network Modernisation Programme, valued at RM185 million, is being implemented in stages throughout Sarawak. This programme is expected to be fully completed in the second quarter of 2027, next year. Once completed, the overall network capacity will increase from 1.6 Terabits per second (Tbps) to 7.2 Tbps, while the capacity of each site will increase from 10 Gigabits per second (Gbps) to 100 Gbps, to reduce congestion and improve internet quality. So, please bear with us. The process of internet network modernisation is underway. So that will, I believe, will improve our internet connectivity comparatively better than what it is right now. So, please bear with us.
Internet Coverage Along Sarawak Highways
In line with the "Di Mana Ada Jalan, Di Situ Ada Internet" (Wherever There Is a Road, There Is Internet) initiative by MCMC, efforts to improve telecommunication coverage are being implemented in stages along the Pan Borneo Highway, along the Coastal Road (Lebuh Raya Jalan Pesisir) and along the Second Trunk Road to address blindspot areas without coverage, there is no line, as someone put it. Some people say, "sikdo line," as they say. Yes, blindspot, as well as weak coverage. As a first step, efforts to improve coverage through the construction of new towers are being implemented at 40 strategic locations along the Pan Borneo Highway. So, now 40 locations have been identified, along the Pan Borneo Highway.
Telecommunication Network Congestion Issues
Mr Speaker, telecommunication network congestion occurs when demand exceeds the available network capacity, due to increased data use through video streaming applications such as YouTube and Netflix, as well as an increase in the number of users, especially in longhouses and villages during festive seasons, moreover when young people return from urban areas to their hometowns and respective longhouses.
To address this issue, the Sarawak Government is working with MCMC and telecommunication service providers to upgrade and modernise the network, in addition to increasing telecommunication capacity and coverage to ensure more stable and quality facilities.
So, I hope lah this is very clear lah. So, when we talk about, before I touch on about Mobile World Congress, it is just like a road congestion on the road lah. When it is festive season we go back to kampung, the roads will definitely be congested. Traffic jam on the road, likewise in, what's it called, network congestion. It happens when many users use the line, especially when our young people go back to their kampung lah.
Mobile World Congress Barcelona 2026 (MWC 2026)
Now, I would like to touch on Mobile World Congress Barcelona 2026 (MWC 2026). The Sarawak Government participated in Mobile World Congress Barcelona 2026 and also provided an exhibition through the Sarawak Pavilion from 2 to 5 March 2026 in Barcelona, Spain, to explore the latest telecommunication technologies, particularly 5G networks, artificial intelligence (AI), satellite technology and innovative solutions to improve internet coverage, especially in rural areas of Sarawak.
This participation also opens opportunities for strategic cooperation with global telecommunication industry players and identifies practical and cost-effective technologies for application in Sarawak. This effort is in line with the PCDS 2030 aspiration to ensure that the people of Sarawak enjoy quality, stable and affordable telecommunication services.
International Digital Economy Conference Sarawak (IDECS 2026)
For the information of this Honourable House, the International Digital Economy Conference Sarawak 2026 (IDECS 2026) was held from 5 to 6 October 2026 and successfully attracted the participation of more than 20,000 delegates from 18 countries, and a total of 19 Memorandums of Understanding (MoU) were signed between local and international companies.
In addition, the Sarawak Multimedia Authority (SMA) also launched the Sarawak Cybersecurity Strategy and Roadmap (SCSR) 2030, which was officiated by the Honourable Premier of Sarawak. SCSR 2030 is Sarawak's first comprehensive cybersecurity strategy based on Whole-of-Sarawak, with the vision "A Secure and Trusted Foundation for Sarawak's Digital Economy."
Sarawak is developing capabilities in artificial intelligence (AI), semiconductors, advanced connectivity, smart infrastructure, renewable energy and the space economy. These sectors are increasingly interlinked and complementary, thereby opening opportunities for Sarawak to leverage its strengths in energy, natural resources, biodiversity and digital infrastructure to attract strategic investment and generate new economic value.
However, capacity development must be followed by research that leads to practical applications, commercialisation of innovation and the adoption of technology in industry. Close collaboration between government, industry, universities, researchers and investors is important to produce practical solutions that meet economic and societal needs.
CHALLENGES
Now I would like to touch on, Mr Speaker, the major challenges. Among them are:
Vandalism and Theft of Utility and Telecommunication Facilities
Cases of vandalism and theft of utility and telecommunication equipment still occur and affect services to the public. From 2024 until the second quarter of 2026, a total of 4,920 cases were recorded, with estimated losses of RM28.8 million, not including the impact on economic activities and the daily lives of the public. Not including complaints (public nuisance) caused by vandalism and theft of utility components statewide. So, this is very serious, Mr Speaker.
This incident also affects the image and reputation of utility and telecommunication agencies due to repeated service disruptions, even though the agencies concerned are themselves the victims of vandalism. So normally, yes, human beings, being human beings lah. They get angry lah. If there is no internet, if the fire goes off because the cable was cut, the cable was stolen. So, the first impression is on the service providers. Whether CelcomDigi, SDEC, MCMC or SESCO, they are scolded by parties who do not know the actual cause of what happened, what, the services provided. Yet at the same time, the cable is cut, the cable is stolen, so there is no service available. So, this is very serious. That is why I was saying it is really public nuisance. So, I hope we get cooperation from all Honourable Members so that this matter can be curbed together in the future, especially in isolated areas, in the rural areas. So, this is one of our tasks in order to provide excellent service in the rural areas.
Through the Anti-Vandalism Committee established by my Ministry, various anti-vandalism initiatives have been carried out by my Ministry together with relevant Sarawak and Federal government departments and agencies:
(a) Strengthening cooperation and involvement of local communities through anti-vandalism awareness programmes, while encouraging the public to report vandalism incidents. For the information of all, the anti-vandalism awareness campaign will be held next in Samarahan Division shortly. So, the next station will be in Samarahan Division;
(b) Intensifying enforcement actions through 'Ops Lusuh' on premises dealing in scrap goods by the Royal Malaysia Police (PDRM) together with enforcement, utility and telecommunication agencies. So, 'Ops Lusuh' is one of the strategies to stop all this vandalism activities;
(c) Improving security control of utility and telecommunication assets, such as the installation of smart surveillance systems including thermal cameras and motion detectors; the construction of concrete fences with barbed wire, the use of non-metallic water meters that have no resale value, and patrols by agencies and local communities, particularly in high-risk areas or hot spots.
So, I want to share here that because of the widespread vandalism activities and cable theft cases, SDEC has built a wall nine feet high. On top of it they placed barbed wire. You just imagine 9 feet with barbed wire on top and I had the opportunity of visiting the site at Sungai Rayah, Sarikei together with the State Assemblyman (ADUN) for Meradong recently and it is a pity that we have to spend such an amount just to make sure that the area is not vandalised. That is one of the five areas being built by SDEC. You know how much it cost? It costs us RM100,000.00. That RM100,000.00 could be used elsewhere for some other more beneficial purposes, so this is the step taken by our SDEC to make sure that our assets are in good order, to make sure that services are available to the rural areas. So, I just want to give you the example.
Preparedness for the Dry Season and El Niño
Mr Speaker, I would like to touch on preparedness for the dry season and El Niño. The El Niño phenomenon currently occurring is not a phenomenon that occurs only in our place, but rather a global climate phenomenon that affects weather patterns in various regions of the world. Based on records, this phenomenon occurs periodically at least once every two years and usually lasts for about one year. Among the major El Niño events recorded in history are those in 1972 to 1973, 1982 to 1983, 1997 to 1998 and 2015 to 2016, which were categorised as strong to very strong. The El Niño phenomenon currently occurring is expected to reach a strong to very strong level and may persist until January to March 2027. So, the terminology strong and very strong we obtained from MBT. So, this is their term.
In Sarawak, this situation has caused the water levels in some hydroelectric dams to begin to fall. The water levels at several rivers have dried up and some rivers near coastal areas have been invaded by salt water (saline intrusion). The reduction in rainfall in Sarawak has also caused river water levels, water levels at intakes and hydroelectric dams to fall, to the extent of affecting water treatment plants, electricity generation capacity and the daily lives of the people, especially rural communities who depend on river water sources.
As an example of the rivers that have dried up due to the El Niño phenomenon is Sungai Seblak in Saratok. Sungai Seblak has a plant with a capacity of 25 million litres of water per day, and it so happens that one day the river, which is also well known for having many fierce crocodiles there, dried up, so the plant could not operate. And this has affected the water supply around Saratok and Kabong. That is beyond our control, but we are taking steps to ensure that in the future it will not happen again, but somehow Sungai Seblak, which had dried up, suddenly filled with water again after cloud seeding was carried out by the relevant parties. This means Sungai Seblak, which at one time had dried up completely, has filled with water again, so there is raw water for us to enable our water treatment plant in Licuk to operate as usual.
Likewise in Daro, the river has dried up. Lingga, Simunjan and Lawas also have intakes that have moved far downstream, and this is a major challenge for us. So, I hope we can resolve this together through consensus, and we are working with SDMC to tackle how best we could look into the supply of raw water in order to ensure that our raw water intake for our water treatment plant is always available so that the treated water is also available.
The reduction in rainfall in Sarawak has also caused river water levels, water levels at intakes and hydroelectric dams to fall, to the extent of affecting the operation of water treatment plants, electricity generation capacity and the lives of the people, especially rural communities who depend on river water sources.
As a mitigation measure, the Sarawak Government has carried out four series of Cloud Seeding Operations to increase raw water resources through the Sarawak State Disaster Management Committee (SDMC), in cooperation with relevant agencies, including the National Disaster Management Agency (NADMA), the Royal Malaysian Air Force (TUDM), the Malaysian Meteorological Department (MET Malaysia), the Civil Aviation Authority of Malaysia (CAAM), the Malaysian Civil Defence Force (APM Sarawak) and the Sarawak Security and Enforcement Unit (UKPS), as well as agencies under my Ministry, namely Sarawak Energy, Sarawak Water and the Rural Water Supply Department of Sarawak (JBALB).
My Ministry, through JBALB, Sarawak Water and Sarawak Energy, has also taken the following preparedness measures:
(a) Providing 126 water tanker lorries for the delivery of water to affected areas throughout Sarawak;
(b) Providing 32 water collection centres, namely 22 in Sri Aman, six in Betong and four in Kapit;
(c) Testing the feasibility of using desalination plants, given that the raw water sources at the intakes of some rivers have dried up and some rivers have been invaded by salt water due to the unforeseen El Niño phenomenon; and
(d) Sarawak Energy is optimising generation by increasing the use of thermal energy, particularly gas, to reduce dependence on hydroelectric power and conserve dam water storage.
Damage to Utility and Telecommunication Infrastructure by Third Parties
Mr Speaker, next I would like to touch on damage to utility and telecommunication infrastructure by third parties. Damage caused by third parties during excavation and construction work often results in damage to water pipes, underground electricity cables and utility poles, thereby causing service disruptions and losses to agencies and consumers.
This is the dilemma faced by utility and telecommunication agencies under the supervision of the Ministry of Utilities and Telecommunications. This is a big challenge and a big dilemma for us. Every time utility facilities are damaged and services are disrupted, the agencies concerned are often the target of criticism and blamed by the public, whereas in reality the damage originates from third parties.
Even more regrettably, these agencies have to bear losses in terms of repair costs, negative perceptions, public pressure and the workload of repairs caused by third parties. This matter cannot be allowed to continue. Parties that cause damage must be more responsible when carrying out work in the field.
For example, the incident of a burst pipe on Jalan Tun Jugah recently affected more than 100,000 households and took seven hours to repair. Moreover, the incident involved a relocated pipe that had just been moved to a new alignment. So, I was surprised. When I went to visit the site that particular night, I was asking the workers on site what happened, and I was being brief that the damage was inevitably, they said, done to the relocated pipe on the new alignment, which should not happen at all. New alignment means, you already know where the alignment is lah. So, this matter should not have happened. And this involves human carelessness lah, human error I think. So, I hope this matter does not happen again. In fact, I was on the site that night with my officers reminding them not to repeat the same mistake, do not repeat the same mistake. From 2025 until now, a total of 1,378 damage incidents caused by third-party activities have been recorded, involving construction contractors, excavation companies and project developers, with an estimated repair cost of RM4.6 million.
My Ministry calls on developers/contractors to always comply with the stricter and tighter Standard Operating Procedures (SOP) that have been established when carrying out work in the field, in order to avoid damage to utility and telecommunication facilities. Probably the other strategy could be heavy penalties in the near future, which could be the deterrent, but I'm just thinking that it could be a deterrent and such incidents will not happen.
Now, I would like to respond to the specific issues raised by Honourable Members in the debate during this session.
Specific Issues Regarding Water Supply
For the information of the Honourable Member for Kalaka, Kabong and Krian, the areas raised have obtained water supply from the existing water treatment plant. As was informed during the engagement session in August last year, in order to improve the water supply system in the area for the long term, the Sarawak Government has implemented the following projects:
(a) Upgrading the Kaki Wong, Betong water treatment plant from 30 million litres of water per day to 60 million litres of water per day, which has already started at the site and is expected to be completed by the end of 2028. So, this is one of long-term planning based on our Water Supply Master Plan and Sarawak Water Grid Master Plan;
(b) We are upgrading the Lubau water treatment plant from 30 million litres of water per day to 60 million litres of water per day and its physical progress at the site is very encouraging. So, this is another effort taken by the Sarawak Government in order to increase water production in Betong division. So, it means that if the Betong water plant and the Lubau water plant are completed, 60 plus 60 will give a total of 120 MLD in the near future;
(c) We also have the Betong Regional Water Grid System, which is expected to be completed in the third quarter of 2028 and involves the construction and installation of distribution pipes and communication pipes from Betong towards the Saratok area. We have the Betong Regional Water Grid system, which is expected to be completed in the third quarter of 2028, this one leads to Pusa. Sorry, this one leading to Pusa, which is expected to be completed in 2028;
(d) Another one is the Saratok Regional Water Grid System, which is expected to be completed in the second quarter of 2028. That means from Betong towards the Saratok area.
That means if we take into account, there are four big projects in Betong Division. Upgrading the Lubau water treatment plant, upgrading the Kaki Wong water treatment plant, and the grid system from Betong to Saratok, the grid system from Betong to Pusa, involve major expenditure by the Sarawak Government, more than I think around RM500 million. So, this is our long-term planning. So, hopefully, I'm not saying 100%, Mr Speaker, but I believe, I believe, once all these projects are completed in the near future, we will have comparatively better water supply. It means, as I said earlier, there is a fruit to wait for lah, because now all these projects are under implementation.
For the information of the Honourable Member for Kabong, the water supply project to the Ulu Roban area is expected to be tendered at the end of this year. Meanwhile, the water supply project to Kampung Gerigat is now at the pre-implementation stage. For the information of the Honourable Member for Bukit Assek, apart from the Salim Water Treatment Plant upgrading project from 150 million litres of water per day to 300 million litres of water per day, which is the largest plant in the Central Region, a total of 11 projects have been approved under the Water Pipe Upgrading and Replacement Programme in Sibu Division, which are now at various stages of implementation and are expected to be completed in the third quarter of 2028. With the completion of all these projects, the supply capacity and water pressure in Sibu Division will improve.
For the information of the Honourable Member for Pending, the issue raised regarding low water pressure is a localised issue. It is a localised problem and we are looking into it. Localised problem, it's not the overall Kuching City. So, Sarawak Water has been instructed to look into how best we could improve this localised problem. So, I hope you will assist us also.
For the information of the Honourable Member for Lingga, Engkilili and Bukit Begunan, in order to improve the water supply system in the area for the long term, the government is and will be implementing the following projects:
(a) The new Engkilili Water Treatment Plant, Sri Aman, with a capacity of 75 million litres per day, with physical progress of 23.1% and expected to be completed in the second quarter of 2028. That should be able to supply Sri Aman Division including Lingga and Engkilili;
(b) The Engkilili Bayai Water Grid System, which is currently at the tender stage. So, there will be a connectivity from the Engkilili New Water Treatment Plant to the Bayai Treatment Plant. So, that will ensure that the supply is sufficient for Engkilili and for the Bayai Treatment Plant for further distribution in Sri Aman Division; and
(c) The Sri Aman Regional Water Supply System, which is currently at the pre-implementation stage. So, that will complete our Water Grid System in Sri Aman Division. But, as I mentioned earlier, all these projects are under implementation, pre-contract, and the funding is all there, so we should be able to look forward to better supply once all the projects are completed in the near future. This is real, not empty talk, this is the fact based on the Sarawak Water Supply Master Plan, based on the Sarawak Water Grid System that is being implemented by the Sarawak Government at present. This is real, not empty stories, real, I tell you ya.
For the information of the Honourable Member for Murum, in order to improve the water supply system in the Sungai Asap area, the Sarawak Government has and will be implementing the following projects:
(a) Replacement of Ultrafiltration (UF) membranes, which was completed on 9 September 2026;
(b) Improvement works at the Sungai Asap Water Treatment Plant with physical progress of 43%, expected to be completed in the first quarter of 2027; and
(c) The project to upgrade the capacity of the Sungai Asap Water Treatment Plant from 5 million litres of water per day to 10 million litres of water per day is now at the pre-implementation stage.
For the information, at present the existing raw water source is still sufficient to meet current needs. For long-term planning, the proposal for an alternative water source from Batang Belaga will be studied based on water demand projections as well as technical studies and feasibility.
For the information of the Honourable Member for Jepak, water supply to the Samarakan and Serupai areas will be implemented through:
(a) The Samarakan Area Rural Water Supply (BALB) Project, which is expected to be tendered at the end of this year;
(b) The Kuala Tatau to Kuala Serupai Rural Water Supply (BALB) Project, expected to be tendered in the first quarter of 2027;
(c) The Proposed Improvement of Water Supply for six Kampung at Serupai Area, Bintulu, Sarawak, which is now at the pre-implementation stage.
For the information of the Honourable Member for Repok, water supply to the areas raised will be implemented through the following project:
(a) The Sebangkoi Area Water Supply Project, which is now at the tender stage; (b) The Water Supply Grid to Sarikei and Tanjung Manis, which is now awaiting the tender decision to be awarded. It has been approved, waiting for the tender to be awarded.
For the information of the Honourable Member for Balingian, water supply to the areas raised is and will be implemented through the following projects:
(a) Upgrading the Basong Water Treatment Plant, Mukah, from 60 million litres of water per day to 120 million litres of water per day, which is now at the implementation stage and is expected to be completed in the third quarter of 2028. In fact, I have visited the site recently together with the Member for Tellian. So, the progress is going on satisfactorily. So, you should have enough water once this project has been upgraded to produce 120 MLD in the near future. I think even 60 MLD is more than sufficient but we are looking at Mukah Division as a whole. Because we want to ensure that all parts of Mukah will be getting enough water once our grid systems are fully implemented;
(b) The Mukah Water Grid System, which is now at the implementation stage and is expected to be completed in the third quarter of 2028. Yes, as I said earlier, our grid system has also begun. This means water will be channelled from the Basung Water Treatment Plant to all corners of Mukah Division, and one of the ways is to build the Mukah Water Grid System, whose implementation has already begun. So, Mukah should be comfortable, besides Tanjung Manis that has its own system on the other side, but ultimately Mukah Division will have more than sufficient water supply with the completion of this water treatment plant and with the completion of our water grid system in Mukah Division;
(c) The Balingian-Kuala Balingian-Serupai Water Grid System alignment, which is now at the pre-implementation stage. This is also a grid system that is currently at the pre-implementation stage and this will further strengthen the water supply in the Mukah area.
For the information of the Honourable Member for Tanjong Batu, a total of six projects have been approved under the Water Pipe Upgrading and Replacement Programme in Bintulu Division, which are now at various stages of implementation and are expected to be completed in the third quarter of 2028. With the completion of all these projects, the supply capacity and water pressure in Bintulu Division will improve. To address the problem of murky water, Sarawak Water constantly carries out scheduled flushing activities and, if complaints are received, Sarawak Water will carry out flushing activities immediately.
For the information of the Honourable Member for Katibas, in order to improve the water supply system in the areas raised, the Sarawak Government is and will be implementing the following projects:
(a) Construction of the new Song Water Treatment Plant, Kapit, with a capacity of 20 million litres of water per day, which is currently at the early implementation stage and is expected to be completed in the first quarter of 2029. So, this project has taken off the ground, it has already started at the site;
(b) The Song Water Grid System, which is currently at the pre-implementation stage; (c) The construction of a new Alternative Water System, which is currently at the pre-implementation stage;
(d) The Sarawak Alternative Water Supply System (SAWAS) Phase 3, which is currently at the pre-implementation stage.
For the information of the Honourable Member for Meluan, my Ministry, through JBALB, will continue to monitor the Julau Water Grid System and the Acute Water Treatment Plant. Both projects are now at the pre-implementation stage and Meluan should be happy enough that we have just completed your new treatment plant recently. So, that will cater to your water supply efficiently. So, this is another project lah, the new treatment plant, which was recently completed. So, I will see, and together with the Member for Meluan lah, probably shortly see, because Meluan is very excited about it, and this is part of the Sarawak Government's effort to ensure that even Meluan is part of the area where we must ensure there is enough supply of treated water, especially with the completion of the recently completed new treatment plant.
For the information of the Honourable Member for Tamin, in order to improve the water supply system in the areas raised, the government will implement the following projects:
(a) The Sekuau Water Treatment Plant Upgrading Project is now at the tender evaluation stage by the Ministry of Rural and Regional Development (KKDW);
(b) The Rural Water Supply Department for the Sungai Arip, Ulu Baoh and Sebakong areas is now at the design stage and is expected to be tendered in the first quarter of 2027.
For the information of the Honourable Member for Batu Danau, the plan to implement a water supply project to clinics, schools and longhouses along the road to the Ulu Lubai area has been proposed for a feasibility study under the Sarawak Alternative Water Supply (SAWAS) Phase 3 programme.
The water supply project from Nanga Medamit through Jalan Simpang Semena to Kuala Medalam is part of the scope of the road construction and water supply project under the implementation of the Regional Corridor Development Authority (RECODA). The project, namely The Proposed Construction of New Road and Water Supply from Nanga Medamit to Rumah Aling, Limbang District, is now in the implementation stage and is expected to be completed in the second quarter of 2028. Water supply to the Tedungan area, the hill area, Kampung Kuala Awang and surrounding villages will be improved through the implementation of the following projects:
(a) Proposed Dedicated Pipeline from Berawan Water Treatment Plant to Supply Batu Danau Areas and Lubok Tuan Booster Station, Limbang, Sarawak is expected to commence at the end of this year and is expected to be completed in the second quarter of 2028; and
(b) Proposed Replacement of Existing Watermains and Associated Works at the Kubong/ Medamit Junction to Medamit/ Batu Danau Junction, Jalan Medamit, Limbang is now in the implementation stage and is expected to be completed in the third quarter of 2027.
Specific Issues (Electricity Supply)
Mr Speaker, next I would like to touch on specific electricity issues. For the information of the Honourable Members for Balingian, Tellian, Katibas, Opar, Meluan and Tamin, the implementation of the Additional and Late Applicant Fund (ALAF) project is still continuing and is now at the final stage or at the end of Phase 4. The implementation of this project will continue in Phase 5 and subsequent phases to expand access to basic electricity supply facilities in rural areas.
For the information of the Honourable Members for Murum and Tanjung Datu, my ministry through Sarawak Energy will continue to monitor the reliability of electricity supply in the areas raised. Projects to upgrade electricity supply infrastructure are being and will be implemented according to the needs of each area to improve the stability of electricity supply in the areas concerned.
For the information of the Honourable Members for Telang Usan, Engkilili and Batu Danau, the Sarawak Government will implement a phased programme to replace batteries and main components for the SARES systems that have reached the end of their lifespan during the Thirteenth Malaysia Plan, as I explained earlier. A study will be carried out to upgrade these SARES off-grid systems to grid systems in the near future.
Following the fire that occurred at the Long Atip Hybrid Solar Station, Telang Usan, immediate action has been taken to ensure the continuity of electricity supply to residents by providing gensets as a temporary measure. At the same time, Sarawak Energy is conducting a technical assessment to determine the scope and value of the damage for the repair and restoration works of the station.
Specific Issues (Telecommunications)
Next I would like to touch on specific telecommunications issues. For the information of the Honourable Members for Ba'Kelalan, Repok, Bukit Semuja, Kabong, Kalaka, Tellian and Krian, my Ministry through MCMC will assess telecommunication coverage and service-related issues in the areas mentioned. These include identifying appropriate measures including backhaul upgrading and other fit-for-purpose technology to improve service coverage and quality in the affected areas.
For the information of the Honourable Members for Balingian and Tamin, to expand and improve telecommunications services in the areas raised in the Balingian and Tamin State Constituencies, several more towers will be built under JENDELA Phase 2, which is expected to commence in the first quarter of 2027.
Acknowledgement
Now we have discussed many facilities and so on. I must also record my appreciation to the Honourable Members who have expressed their thanks and appreciation to the Sarawak Government, to my Ministry and to the relevant agencies entrusted with the task of providing electricity, water, electricity and gas facilities in Sarawak.
To the Honourable Members for the areas of Ba'Kelalan, Bukit Assek, Daro, Tellian, Katibas, Opar, Meluan, Tanjong Datu, Stakan and Bukit Bangunan, and perhaps a few other Honourable Members, I greatly appreciate the words of appreciation given to the Sarawak Government, my Ministry and the agencies under the supervision of my Ministry in the effort to provide electricity, water, telecommunications and also LPG gas facilities throughout Sarawak. I thank everyone for that appreciation. We really appreciate your appreciation. Thank you very much. Indeed, this recognition becomes a spur to the spirit of our officers to continue to enhance their efforts and commitment in delivering the best services and the well-being of the beloved people of Sarawak.
Closing
Before I end my speech, Mr Speaker, I would like to record my highest appreciation to Mr Speaker, the Deputy Speaker, the Secretary of the DUN and all the staff of the House for the smooth running of this sitting. Appreciation also to the Secretary to the Sarawak Government, the Federal Secretary, the Attorney General of Sarawak, the Sarawak State Financial Secretary, all Permanent Secretaries, all Heads of Department, the hansard reporters, and all parties who have given their cooperation throughout this sitting so that it could run smoothly. I also record my highest appreciation and thanks to my two Deputy Ministers, the Deputy Ministers in my ministry, the Permanent Secretary of my ministry, the Deputy Permanent Secretaries in my ministry, and all staff of the Ministry of Utilities and Telecommunications as well as all departments and agencies under the supervision of the Ministry of Utilities and Telecommunications for the commitment given.
In conclusion, thank you to all Honourable Members for the questions, views and proposals that have been put forward. All inputs will be studied to strengthen the planning and delivery of more efficient, sustainable and inclusive utility and telecommunications services for all the people of Sarawak.
Mr Speaker, I conclude my winding-up speech with several pantun as follows:
Terubok fish is delicious to eat, Served as a midday meal, Water and electricity continue to be supplied, Gas and internet complement the utilities.
Pau Sebuyo tastes delicious, Carried as provisions by Pak Hairi's child, Utility projects are being built, Buah tunggu at the dawn of dudi. ...(Applause)...
Proudly stretches the Batang Lupar, A place where fishermen seek their livelihood, Utilities solid, development smooth, The harvest reaped and enjoyed by the state. ...(Applause)...
Going to gather pelajo fruit, Fruit picked all alone, Thank you, Premier Abang Jo, Sarawak advanced and prosperous state. ...(Applause)...
That is all, thank you.
Thank you, Honourable Dato Sri Haji Julaihi, Sarawak Minister of Utilities and Telecommunications, for the winding-up just now. Honourable Members, we adjourn the sitting until 2:30 p.m. today. Insya-Allah.
(The sitting was suspended at 1:04 p.m.)
(The sitting resumed at 2:40 p.m.)
[Mr Speaker presided over the sitting]
Honourable Members, with respect, I invite the Honourable Dato Sri John Sikie anak Tayai, Minister in the Premier's Department, to deliver the winding-up speech.
Good afternoon, greetings of peace, greetings of Segulai Sejalai and Salam Sarawak Maju Makmur. Mr Speaker, on this occasion, I would like to welcome the young men and women from the Kakus State Constituency who are in the gallery.... (Applause)...
Supply (2027) Bill 2026Bill
I would like to congratulate Yang Amat Berhormat Datuk Patinggi Tan Sri (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Premier of Sarawak for presenting Sarawak Budget 2027 which is historical and the biggest budget ever with the theme, “Together Building Prosperity and Securing Our Futures”.
This budget is a clear roadmap focusing on uplifting livelihoods, strengthening our economy, safeguarding the social safety net, reinforcing fiscal resilience and unlocking the opportunities of the green frontier in line to the vision set forth under the Post Covid-19 Development Strategy 2030 or PCDS 2030. I am confident that this budget will pave the way for more prosperous and inclusive Sarawak. I concur with Yang Amat Berhormat Premier that this is the future we are securing for our children and we carry this responsibility together.
Tuan Speaker, I would like to express my sincere gratitude for the time and opportunity given to me to deliver my winding up speech this afternoon. I will now speak on matters relating to my portfolio which covers the following agencies namely Majlis Adat Istiadat Sarawak, Native Court of Sarawak, Administration Unit, Immigration and Labour Management Unit (ILMU), Sarawak Security and Enforcement Unit (SSEU), the Human Resource Development and Management Unit (HRDMU).
Sarawak Customs and Protocol Council
I will begin by addressing matters pertaining to the Majlis Adat Istiadat Sarawak. Firstly, I would like to inform this august House that Yang Berbahagia Datu Dr. Neilson Ilan Mersat has been appointed as the new Ketua Majlis of Majlis Adat Istiadat Sarawak effective July 2026. In this regard, I would like to welcome and extend my heartiest congratulations to him.
His vast experience expertise in areas relating to ethnic relations and indigenous knowledge will be invaluable in guiding Majlis Adat Istiadat Sarawak in its role as the advisory body on matters relating to adat and culture of the native communities. I would like also to convey my sincere gratitude to the Sarawak Government for its continuous support to Majlis Adat Istiadat Sarawak.
Preservation, Development and Dissemination of Adat
For the information of this august House, Majlis Adat Istiadat Sarawak plays a vital role as an advisory body on all matters pertaining to the adat of the native communities of Sarawak. Majlis Adat Istiadat Sarawak remains committed to strengthen its role through effective preservation, development and dissemination of adat across the state. In tandem with these efforts, Majlis Adat Istiadat Sarawak continues to enhance its presence and visibility among key stakeholders and the rakyat. This entails examining adat through a modern and contemporary lens to address social gaps while adding value to its practices at the grassroots level.
Review of Adat
Tuan Speaker, I would like to update this august House on the drafts of the reviewed Adat Iban, Adat Bidayuh, Adet Kayan and Adet Kenyah. The drafts have now been submitted to the State Attorney-General’s Chambers (SAGC) for review in June 2026. At the same time, the drafts of Adet Melanau, Adet Bagatan, Adet Berawan and Adet Kiput are also under the review of the State Attorney-General’s Chambers (SAGC). While waiting for clearance from the State Attorney-General’s Chambers on the drafts of the reviewed text in all of the adat, Majlis Adat Istiadat Sarawak is currently preparing the Explanatory Notes to accompany the text under review.
The Explanatory Notes are intended to provide clearer understanding and practical guidance on adat to all parties involved in the administration, as well as members of the public who have an interest in understanding adat. In additional, efforts are also ongoing to review four existing adat codes specifically, Adat Bisaya, Adat Lun Bawang, Adet Penan and Adet Kelabit. Majlis Adat Istiadat Sarawak is also preparing to commence preliminary work for the codification of three adat, namely, Adet Tagal, Adet Punan and Adat Iban Remun.
Capacity Building Programme
In addition to review and codification activities, Majlis Adat Istiadat Sarawak actively conducts capacity building programmes such as workshops and seminars to equip native community leaders with the latest information and a deeper understanding of adat at the grassroots level. As of quarter three 2026, a total of five capacity building programmes had been organised for 190 community leaders from Betong, Mukah, Dalat, Sibu, Kuching and Serian. Another significant programme was the Adat Iban Symposium 2026, held in Sibu recently. This symposium was attended by 470 participants statewide, comprising Iban community leaders that is Temenggong, Pemanca and Penghulu, government agencies, Non-Governmental Organisations and institutions of higher learning.
I am pleased to inform this august House that one of the key resolutions adopted during the Adat Iban Symposium 2026 was to uphold and preserve the sanctity of the Gawai Dayak, which is celebrated annually on 1st June. In accordance with this resolution, pre-Gawai celebrations or Mantar Gawai, should commence no earlier than 1st May, Ngiling Bidai or Ngiling Tikai celebrations should conclude not later than 30th June each year. The resolution was initiated by a Temenggong and subsequently received unanimously support from all community leaders in attendance. This collective agreement reflects their shared commitment to safeguarding the significance, traditions and cultural integrity of Gawai Dayak, while ensuring that its celebration on 1st June remains the focal point of this important cultural heritage. Majlis Adat Istiadat Sarawak is planning to organise an Orang Ulu Culture and Tradition Symposium in 2027. This symposium aims to showcase rich cultural heritage of all Orang Ulu ethnic and sub-groups in Sarawak.
Tuan Speaker, Majlis Adat Istiadat Sarawak in collaboration with the Dayak Bidayuh National Association (DBNA), Klang Valley Branch conducted an engagement session with 50 Bidayuh diaspora last month in Kuala Lumpur. The session shed light on what it means to be living outside their village and outside Sarawak. It highlighted the challenges they face in understanding and practising Adat Bidayuh, culture and traditions. The programme aimed to strengthen their understanding of Adat Bidayuh 1994 and to expose them to the adat review efforts. There are a few upcoming programmes scheduled in the fourth quarter of 2026 such as, Seminar on Adat Iban 1993 in Dalat and Kuching as well as stakeholders’ engagement in Bintulu.
Culture and Tradition
Majlis Adat Istiadat Sarawak in its role in cultural preservation complements the broader mission of Post COVID-19 Development Strategy (PCDS 2030). While PCDS 2030 provides a broader framework for Sarawak’s development and transformation, Majlis Adat Istiadat Sarawak contributes by safeguarding the cultural heritage, customary traditions and ancestral values of the native communities.
Together these efforts help ensure that Sarawak’s pursuit of economic growth and modernisation goes hand in hand with the preservation of its rich cultural diversity and heritage. Majlis Adat Istiadat Sarawak has carried out three field studies: the first involved the Kayan community on Maren Death and Burial Practices in Bungan Belief. The other two involved the Tanjong community in Belaga and the Kanowit community in Kanowit.
These fieldworks were conducted to gather information and data on the culture, traditions and history of these communities, contributing to the systematic documentation and preservation of the cultural heritage. In addition, Majlis Adat Istiadat Sarawak was entrusted with a leading role in coordinating the Miring Ritual for Niti Daun Procession in conjunction with the State-Level Gawai Dayak Celebration 2026.
Majlis Adat Istiadat Sarawak is also continuously exploring new collaborations with universities, government agencies and Non-Governmental Organisations (NGOs). Recently, Majlis Adat Istiadat Sarawak initiated a collaboration with the Dewan Adat Dayak (DAD), Indonesia through a series of seminar. The first seminar related to the Dayak Communities in Kalimantan was held in August 2026.
Publication
Majlis Adat Istiadat Sarawak is also actively involved in documenting and publishing books on the heritage of the native peoples of Sarawak. I am proud to announce, that recently, one of the books entitled, “Etnik Bidayuh dan Bale Gambang-Baruk: Identiti, Tradisi dan Perubahan”, written by one of the research officers of the Majlis, Dr. Chali Ungang has won awards namely; National Book Award on 3rd December 2025 in Kuala Lumpur organised by National Book Development Foundation and Anugerah Buku Terbaik Premier Sarawak 2024-2025, Kategori Terbitan Luar on 25th September 2026 in Kuching organised by Dewan Bahasa dan Pustaka Cawangan Sarawak.
Majlis Adat Istiadat Sarawak is also in the midst of collecting and analysing data for a publication of coffee table book, titled, “The Native Peoples and Ethnic Minorities of Sarawak”. This book aims to provide a brief description of all ethnic groups as listed in the Interpretation Ordinance, 2005.
Digital Initiatives
Tuan Speaker, I wish to update this august House on the digital transformation initiatives undertaken by the Majlis Adat Istiadat Sarawak, particularly in strengthening the delivery of services and the preservation of Adat-related records and knowledge. This initiative consists of two ongoing ICT enhancement projects, namely, Native Marriage Electronic System Version 2 and the Cataloguing of Oral Traditions System Version 2. Concurrently, Majlis Adat Istiadat Sarawak remains committed to enhance competency among the 120 users of the Native Marriage Electronic System Version 2, from District Offices and Sub-District Offices by organising six workshops in Kuching, Sibu and Miri.
Majlis Adat Istiadat Sarawak will continue to carry out all the afore mentioned initiatives to strengthen its role to ensure that adat remains relevant to the present as well as future generations. Majlis Adat Istiadat Sarawak will serve as a bridge between the past, the present and the future by connecting traditions with contemporary society and future generations.
Native Courts of Sarawak
Mr Speaker, now I will touch on matters relating to the Native Courts of Sarawak. The Government remains committed to strengthening the Sarawak Native Courts as an important institution in preserving the customs, traditions and social harmony of the Sarawak Bumiputera community, and to ensuring the delivery of fair, effective and efficient services to the people.
Amendments to Ordinan Mahkamah Bumiputera 1992
In relation to the proposed amendments to the Ordinan Mahkamah Bumiputera 1992, I would like to inform this august House that the draft amendments are currently being thoroughly examined by the State Attorney-General's Chambers, to ensure that the proposed changes can be implemented and meet the current needs and challenges of the Sarawak Native Courts.
This review is an important step in strengthening the Sarawak Native Courts institution and supporting the effective administration of justice. The Government remains committed to ensuring that the proposed amendments preserve the customs and traditions of the Bumiputera community, while enhancing the capacity of the Sarawak Native Courts to provide fair and effective services. Pending the finalisation and enforcement of the amendments, the Sarawak Native Courts will continue to operate based on the existing legal framework.
Competency Development Programme
Mr Speaker, the Sarawak Native Courts continue to strive to manage the increasing number of cases across Sarawak, even though the number of Magistrates serving in the Native Residency Courts and Native District Courts has decreased. To address this challenge, proactive measures have been introduced to strengthen case management and to equip court staff and community leaders with the knowledge and skills required to carry out their duties. This initiative includes specialised training for Community Heads (Ketua Masyarakat), Clan Heads (Ketua Kaum), court clerks and court attendants to strengthen case management, with a focus on districts that have high backlogs of pending cases.
Mr Speaker, since 2025, the Sarawak Native Courts have successfully implemented nine capacity development programmes in the Divisions of Kuching, Serian, Sri Aman, Betong, Sarikei, Kapit, Sibu, Bintulu and Miri. These programmes involved a total of 398 participants, consisting of 147 Community Heads, 87 Clan Heads, 38 Administrative Officers, 61 court clerks and 65 court attendants at their respective District Offices.
In addition to the capacity development programmes, the Sarawak Native Courts also held district-level engagement sessions to provide practical guidance to Community Heads and Clan Heads in carrying out their roles as Presiding Officers at the Community Heads' Court and Village Heads' Court. This programme can strengthen coordination between staff at the Court District Offices and the Community Heads and Clan Heads. Since 2025, a total of 13 engagement sessions have been successfully held in the districts of Serian, Siburan, Lubok Antu, Kapit, Sibu, Selangau, Bintulu, Miri, Marudi, Mulu, Bario, Limbang and Nanga Mendamit, with the participation of a total of 188 participants.
The management of court case records discussed in these engagement sessions is very important because courts must not only deliver judgments but also keep complete records, including proceedings notes, case documents, orders and written grounds of judgment. These records are an important element in preserving the integrity of the Sarawak Native Courts institution.
I am pleased to inform this august House that the Office of the Chief Registrar, Sarawak Native Courts, has published two books related to court case management, namely the Buku Panduan Pengurusan Rekod dan Pentadbiran Mahkamah Bumiputera Sarawak and the Buku "Kompilasi Soalan Lazim dan Jawapan Mahkamah Bumiputera Sarawak Jilid 1''. The launch of these books was held in Bintulu on 7 October 2026 during the Seminar on Sarawak Native Courts Case Handling for the Tatau District. The Buku Panduan Pengurusan Rekod dan Pentadbiran Mahkamah Bumiputera Sarawak emphasises the orderly management of case files, proceedings notes, court documents, orders and written grounds of judgment. Complete and well-organised records facilitate future reference, strengthen accountability and preserve the integrity of the institution.
Meanwhile, the book Kompilasi Soalan Lazim dan Jawapan Mahkamah Bumiputera Sarawak serves as an easy-to-use reference for court staff, Community Heads and Clan Heads to help them carry out their duties and provide clearer initial explanations to the community.
Mr Speaker, as of September this year, a total of 7,326 cases have been registered since 2020. Of this number, 4,961 cases or 67% have been resolved at all levels of the Court. These cases cover customary law violations, civil cases, applications for recognition as a Sarawak Bumiputera community, and appeal cases.
The Office of the Chief Registrar, Sarawak Native Courts, is always committed to reducing the backlog of pending cases that have accumulated over the past few years, particularly at the Native Residency Court and Native District Court levels. This effort is carried out continuously through more effective case management and coordination, despite facing a limited shortage of magistrates. At present, the Sarawak Native Courts have four Magistrates serving in the Native District Courts, two Magistrates in the Native Residency Courts and one President of the Native Court of Appeal.
At the end of 2024, eight Native District Court Magistrates ended their service because their contracts were not renewed due to age and health factors. At present, the number of vacant posts in the Office of the Chief Registrar, Sarawak Native Courts, is as follows:
(a) Native Residency Court – 7 vacancies; and (b) Native District Court – 8 vacancies.
The Office of the Chief Registrar is working closely with the State Human Resource Development and Management Unit to identify suitable candidates to fill the vacant posts. However, the one-year contract period is a constraint in the recruitment effort, particularly in attracting candidates with the qualifications in law and relevant experience.
Therefore, we request that the contract period for newly appointed Magistrates be extended from one year to three years, with the opportunity for contract renewal subject to satisfactory performance. This extension can help attract and retain qualified candidates, ensure the continuity of judicial services, and support effective case management and access to justice within a reasonable timeframe.
Direction of the Sarawak Native Courts
To ensure that court records are managed systematically, securely and efficiently, the Sarawak Native Courts are upgrading the existing Native Courts System through the e-Native Courts System project, which is a project under the Thirteenth Malaysia Plan (RMK-13). This project was approved on 25 June 2026 with a total cost of RM730,000. It is now in the first phase of implementation by Sarawak Information Systems Sdn Bhd (SAINS). The project is expected to be completed in August 2027.
The e-Native Courts System is intended to facilitate the case registration process, strengthen data integrity and improve service delivery. It is proposed that this system will involve integration with related departments and units, namely the Sarawak State Attorney-General's Chambers, the Sarawak Syariah Judicial Department, the Sarawak Islamic Religious Department, the Sarawak Lands and Surveys Department, the Administration Unit, the Sarawak Public Service Digitalisation Unit and the Sarawak Customs Council.
Integration between these government agencies will facilitate information sharing and administrative coordination, and is in line with the Post-COVID-19 Development Strategy 2030. Efforts to upgrade this system strengthen the commitment of the Sarawak Native Courts as a modern and responsible institution that preserves the integrity of court records, while providing more effective and responsive services to the Sarawak Bumiputera community.
Mr Speaker, next I will touch on matters under the Administration Unit.
Appointment of Community Heads and Clan Heads
The Sarawak Government always recognises the role of Community Heads and Clan Heads as important components in the administrative machinery at the grassroots level. Their role is very significant in supporting the implementation of government policies, programmes and initiatives, and in ensuring that services to the people are delivered in an orderly, effective and comprehensive manner.
The Sarawak Government is also aware that the scope of responsibilities entrusted to Community Heads and Clan Heads is now increasingly broad, complex and challenging. Therefore, the increase in the monthly salary and allowance rates for Community Heads and Clan Heads by RM400.00 a month, which was implemented beginning January 2026, is a token of appreciation for their service, commitment and dedication.
Creation of New Posts of Community Heads and Clan Heads
In response to the issue raised by the Honourable Member for Kabong regarding the creation of new posts of Community Heads and Clan Heads, a total of 1,059 applications for proposals to create new posts of Community Heads and Clan Heads have been received from all Divisions in Sarawak. These applications are currently undergoing evaluation and further study for submission for consideration and approval, taking into account several factors:
(a) The extent of the area of jurisdiction; (b) The increase in the number of houses and residents; (c) The construction of villages, longhouses and the opening of new settlements; and (d) The difficulty of access to certain areas, particularly in areas that can only be reached by air transport, river routes or inland routes due to the mountainous and challenging terrain.
Sarawak Government Quarters for Mukah
For the information of the Honourable Member for Tellian, the new Sarawak Government quarters facility will give priority to staff of the Sarawak Public Administration. However, should there be vacancies, this quarters facility will also be opened to applications by staff of the Federal Public Service.
Proposal to Upgrade the Balingian Sub-District to a District
In response to the proposal put forward by the Honourable Member for Balingian regarding the proposed upgrade of the Balingian Sub-District to a district, for the time being the Government has not yet made any decision on the proposal. For the information of the Honourable Members, several criteria that must be met for the creation of a district are as follows:
(a) The demarcation and extent of the administrative area to be involved; (b) The total population and the villages involved; (c) The financial implications in terms of operating costs and staffing; (d) The potential to contribute to high economic activities; and (e) The capacity to contribute to high levels of official activities, such as obtaining satisfactory collection of revenue.
Mr Speaker, I now will touch on matters concerning Immigration Labour Management Unit atau ILMU.
The Foreign Workers Transformation Approach (FWTA)
I have consistently updated this august House on the implementation of the Foreign Workers Transformation Approach (FWTA) since its inception in 2023. Today, for the information of this august House, I wish to provide a comprehensive update on the operational milestones of the FWTA ecosystem, the Sarawak Advanced Non-Sarawakian Online Labour System atau SANSOLS and the governance of its service provider. By placing verified operational statistics and actual facts before this august House, we ensure that our industry players and the public are guided by accurate data rather than outdated information or speculative figures.
Migration from the MSEN Platform to the FWTA Ecosystem
For the information of this august House, the transition from Monitoring System of the Employment of Non-Sarawakians (MSEN) to the FWTA ecosystem reflects the changing needs of the Labour Management Unit. While MSEN served its intended purpose under the operational requirements at the time, the evolving needs of workforce management called for a scalable platform capable of accommodating emerging technologies and integration with other systems notably Malaysia Integration Immigration System (MyIMMs) and National Integrated Immigration System (NIISe) supporting closer coordination among the relevant state and federal agencies.
Under the FWTA charter, the benchmark processing time for complete applications requiring no further clarification is set at 61 days. Verified operational data recorded over the past four quarters – from 1st October 2025 to 30th September 2026 – demonstrates a consistent and substantial improvement in end-to-end processing speed across Approval in Principle (AP), Labour Licence (LL), and eVDR stages.
Across this one-year period, the overall average processing time per application dropped from 80 days to 43 days – a reduction of 37 days that outperforms our 61 days benchmark by 18 days. In terms of total application volume and processing speed recorded during this period, about 26.06% were processed within 30 days, and 24.47% were completed within 30 to 60 days, meaning over 55.5% of all completed new applications met or beat the 60-days threshold, while 44.47% required more than 60 days due to incomplete documentations and information submitted by applicants.
For the renewal application, an overwhelming 99.63% were processed within 30 days. Only 0.23% took between 30 to 60 days, and just 0.14% exceeded 60 days. From an economic standpoint, these operational gains translate directly into tangible financial and productivity benefits for employers across Sarawak. By cutting average turnaround times by more than a month, businesses can mobilise their workforce significantly faster, preventing costly project bottlenecks and minimising revenue losses caused by labour shortages, particularly in time-sensitive sectors such as construction, plantation, and manufacturing. Furthermore, the near-instantaneous certainty of a 99.63% within-30-days renewal rate ensures uninterrupted workforce continuity, protects ongoing commercial operations, and lowers administrative overhead. Predictable, transparent approval timelines ultimately empower employers to bid for contracts with greater confidence, optimise cash flow, and plan capital expenditure with certainty.
Mr Speaker, to better serve households in Sarawak, the implementation of the HAVEN platform for Foreign Domestic Helper (FDH) applications has modernised application management by providing real-time application traceability, streamlined digital workflows that reduce manual administrative errors, and centralised records management. Furthermore, technical integration between HAVEN and the Immigration Department of Malaysia's MyIMMs and National Integrated Immigration System (NIISe) is currently underway to facilitate seamless cross-agency data exchange.
Regarding the FWTA Service Provider, it is standard practice across both Federal and State Government that such agreements are governed by strict commercial and cyber security confidentiality clauses. However, commercial confidentiality does not equate to an absence of governance. Policy ownership, regulatory authority, and statutory approvals remain strictly under the purview of the Sarawak Government through the Immigration and Labour Management Unit (ILMU). The Service Provider is bound by stringent Service Level Agreements (SLAs), Key Performance Indicators (KPIs), and regular performance audits.
In addition, the Sarawak Government remains committed to a balanced and pragmatic approach that addresses legitimate industry concerns. Throughout 2026, ILMU conducted extensive stakeholder engagements, comprising Industry Updates, Town Halls, and Engagement Sessions across Kuching, Sibu, Bintulu, and Miri, engaging 598 private sector representatives and 188 government agency personnel. Arising from these series of engagements the government is in negotiation with the service provider for a review of their fee structure. It should be noted that since January 2025, to assist the industries, renewal fees has been discounted by 50%.
Currently, the discounted fee for permit renewal remains at RM1,483.00 although the full fee of RM1,854.00 was to be payable effective 15 January 2026. Subject to successful conclusion of negotiations with the service provider the government will announce the revised fee structure. Moving forward the Government is to continue to leverage this collaborative platform to ensure that all system enhancements remain practical, sustainable, and responsive to genuine business needs.
Mr Speaker, for the information of this august House, assertions that the Non-Sarawakian Identity Card (NSIC) lacks Federal recognition or that regional centres remain unoperational do not reflect the reality on the ground. Following an official meeting co-chaired by the Sarawak Government and the Immigration Department of Malaysia in Putrajaya on 7th February 2024, the NSIC was formally recognised by the Federal Government. It was agreed that the NSIC would be implemented under the FWTA ecosystem to serve as the designated identity card for eligible non-Sarawakian workers in Sarawak, in place of the Federal i-Kad which was not used in Sarawak.
Subsequent coordination with the Immigration Department, the Royal Malaysia Police (PDRM), the Sarawak Labour Department, and the Sarawak Security and Enforcement Unit (SSEU) has fully operationalised the card. To bring integrated services closer to employers, the Immigration and Labour Integrated Centre (ILC) in Kuching has been operational since early 2026, and the Sibu ILC officially commenced operations in September 2026 to serve the Central Region. Meanwhile, renovation works for the Miri ILC are in their final stages, with operations set to commence in early 2027. While for Bintulu and Mukah are scheduled to be operational towards the end of 2027
Mr Speaker, our 30-day post-arrival medical examination mandate is not merely an administrative formality. It is our frontline biosecurity defence to protect the people of Sarawak from imported infectious and communicable diseases. The necessity of this strict time frame is proven by data from the Sarawak Foreign Health Information System (SAFHIS). Through stringent health screening conducted under SAFHIS, 497 foreign workers with Hepatitis B and 119 who tested positive for tuberculosis (TB) were identified and prevented from proceeding through the work authorisation process in Sarawak. Early detection prevents disease transmission, shields Sarawak's public healthcare system from avoidable strain and treatment costs and reinforces public confidence in key economic sectors such as hospitality, tourism, and food services.
We have observed, however, that some employers delay sending newly arrived workers for screening until the final days of the 30-day grace period, which compromises early medical intervention. Regarding the financial impact on employers when a worker fails medical screening, fees are not simply forfeited without recourse. Under the FWTA framework, a dedicated replacement mechanism allows any worker who fails the medical screening to be replaced within 60 days at no additional cost. Supported by our improved 40-to-43-day average application turnaround time, the 60-day cost-free replacement window is carefully calibrated to shield compliant employers from financial loss while preventing the misuse or indefinite dragging out of replacement quotas, ensuring statutory and public health obligations are upheld promptly.
Finally, Mr Speaker, this august House must take note of an important operational reality and many of the grievances attributed to the FWTA system do not stem from the platform itself, but from representations made by third-party intermediaries acting on behalf of employers. Reports indicate that certain intermediaries have left employers facing prolonged uncertainty through a lack of transparency, lack of understanding of procedures, inadequate communication, and excessive middleman charges. To date, at least four specific cases have been identified in which employers were told by their intermediaries that their work passes were still pending approval, when official system records proved that approvals had already been granted and notifications issued up to a full month earlier.
These cases highlight the critical need for employers to retain direct ownership and control of their FWTA accounts rather than relying solely on intermediaries whose communications may not reflect the true status of their applications. This is fundamentally an issue of transparency, accountability, and protecting businesses from unnecessary delays, misinformation, and avoidable third-party fees. The Sarawak Government therefore strongly encourages all employers to take an active role in managing their FWTA accounts, verifying their application status through official channels, and ensuring unrestricted access to system notifications.
Any employer who currently does not have full control of their account under FWTA is urged to visit their nearest ILC in Kuching or Sibu, or contact ILMU directly, to regain immediate access. Our objective is straightforward: employers must remain in full control of their own applications, supported by accurate information, transparent procedures, and direct access to the authorities serving them.
Working Visit to Switzerland
Mr Speaker, to set the record straight and firmly dispel the baseless insinuations made by the Honourable Member for Pending regarding the photograph taken in Switzerland in 2024. The Honourable Member questioned whether this was a "private holiday" or an "official trip". Let me state this unequivocally to the floor of this august House, it was an official, sanctioned by state working visit. The working and study visit was sanctioned by the State Cabinet on 22nd August 2024, and a full report of the visit was duly presented to the State Cabinet on 17th April 2025.
Commitment to Continuous Improvement and Strategic Collaboration
Mr Speaker, the Sarawak Government has full knowledge of the vital role that employers and industry players play as the primary engine driving Sarawak's economic growth and development. While the FWTA ecosystem has achieved substantial operational milestones, we recognise that digital transformation is an ongoing journey and that there remains room to be refined and improve the system. We deeply value the constructive feedback provided by our employers, and we remain steadfast in our commitment in translating their on the ground insights into practical system enhancements. As a concrete testament of this collaborative approach, the Immigration and Labour Management Unit (ILMU) officially signed a Memorandum of Understanding (MoU) with the Construction Industry Development Board (CIDB) on 4th October 2026. Moving forward, ILMU will actively forge similar strategic partnerships and expand collaborations with more public and private sector agencies. Together with our industry stakeholders, we will continue to strengthen the FWTA ecosystem so that it remains responsive, efficient, and robust, supporting a resilient business environment while safeguarding Sarawak's regulatory and economic interests.
Sarawak Security And Enforcement Unit (Sseu)
Tuan Speaker, I would like to update, ya, ya…(Interruption)…
Honourable Minister, are you taking the point?
Ya, what is it?
Thank you, Tuan Speaker, and thank you, Honourable Minister. I have paid quite attentively to your answer. So, just now you were saying that the government will come out with a revised structure of the fee, and may we know when that is, because that has been said since last May, and until now we have still not heard of the new revised fee.
And then the second is, in terms of the replacement period, currently what SSEU has been practicing is 60 days for replacement. And the industry players are asking for 180 days, and that was not addressed in your answer. So may we request that the government give a longer period, otherwise if we cannot meet the 60 days, SSEU is going to forfeit the money, 1,854, and that is very unfair to the industrial player.
And the thirdly, that is on the disclosure of the contract signed between the GPS Government, the Sarawak Government, and also SSEU. May we, may the Minister disclose all the terms, how much and the length, the 15 years period, and then what if SSEU failed in his duty? And we want to know the scope and responsibility of SSEU in this area, because and then the fourth one that I would like to also request is regarding that if, for the new application, before the issuance of the labour license, somehow the employed, the so-called foreign workers has failed in the medical examinations, and because the money already been paid, can that be refunded? Because you need to get a replacement worker, but currently what SSEU has been practicing is they also forfeit the money. It seems that everything they want to makan the money, it's just like the Dracula system. So, can that can that be revised? Can we ask, can we, can the government go and tell, direct SSEU don't everything forfeit the money.
And the another thing, in the system, when you choose the clinic, let's say if I'm not mistaken, I was told there is no clinic in Limbang or something. But there is in the system, you can choose Limbang, but somehow the clinic is at somewhere else. By the time the employer knows about it, you have to make another appointment, and you have to pay another RM15 and that is very unfair. If you don't have the clinic in that area, you don't put that in your system. Don't try to mislead the industry player. And then, what else I want to say.
That's all. Thank you. Okay…(Interruption)…
Last one, last one. Can you ask, can you ask SSEU worker, don't dress like ninja? Because that scare off people. No need to be like that, because they are helping the industry player. No need to fold under until sampai only can see the mata. And then as if like they are the, I don't know what lah, try to do be the FBI or something. So, with that, I hope the Minister, what most important thing is revise, when can the fee be lowered? The SSEU did not discount the money, they're going to increase it next January…(Interruption)…
Okay, okay, understood. Okay…(Interruption)…
So, can you answer that, Minister? Thank you.
Now, first one is regarding the revised fee, that one we'll have to wait. Of course, we cannot give you the answer, for example, like the revised factor, we have to have to wait until the meeting is completed, habis semua. And then for the rest one, now that one we don't know. I don't have any figure regarding the agreement and so on, it's not at the moment. So, all the rest, I think, have been answered. Okay, thank you. Ya…(Applause)… Okay. That's it, I answered you already, answer dah ada.
…(Inaudible)…
Ya, that one is a bit too long, so we cannot wait for 180 days. 60 days is more than enough already. Okay? Okay, that's it. Now, I would like to update this august House with matters relating to the Sarawak Security and Enforcement Unit (SSEU).
Strengthening Security, Enforcement and Resilience
Sarawak Security and Enforcement Unit (SSEU) plays a highly significant role as a key agency of the Sarawak Government in strengthening state’s security and implementing law enforcement in a comprehensive and integrated manner. SSEU continues to carry out coordinated enforcement initiatives through close collaboration with Ministry of Utility and Telecommunication Sarawak (MUT) and other relevant enforcement agencies as required.
In 2025, SSEU successfully coordinated and conducted 12 operations, comprising both integrated and standalone operations. These efforts resulted in the opening of four Investigation Papers involving three offences under the Distribution of Gas Ordinance 2016 and one case under the Forests Ordinance 2015.
Up to September 2026, SSEU recorded an increase in enforcement activities, with 15 operations successfully conducted and 13 IPs opened which comprised 11 cases related to gas distribution licences and two cases related to gas pipeline installations. SSEU and MUT also jointly conducted 11 awareness programmes to educate business operators and relevant stakeholders on regulatory requirements governing Liquefied Petroleum Gas (LPG) sales and gas pipeline installations.
These initiatives aim to promote regulatory compliance, enhance safety awareness and ensure that business premises comply with the relevant requirements governing gas pipeline installations and LPG-related activities. In addition, SSEU continues to work closely with the Ministry of Domestic Trade and Cost of Living (KPDN) in implementing OP Tiris Bersepadu 4.0, an integrated enforcement operation aimed at combating the misappropriation and smuggling of controlled goods.
In 2026, a total of 122 LPG cylinders were seized comprising 88 empty cylinders, including 16 MyGaz cylinders, and 34 filled LPG cylinders during enforcement operations including a lorry estimated market value amounted to RM18,800.00. On top of that, the total tender value for the disposal of exhibits and forfeited assets by SSEU for 2026 involving a total of four assets amounting RM406,600.00. One Investigation Paper (IP) was opened by KPDN involving offences related to licensing requirements for oil tankers and the storage of controlled goods in an unlicensed warehouse. The operation also led to the seizure of various items with an estimated total value of RM120,400.00.
Enhancing Maritime Security and SAR Capability
Tuan Speaker, in line with Sarawak’s aspiration towards advancing the blue economy, the Sarawak Coastguard is also moving towards embracing advanced maritime technologies to enhance maritime domain awareness, operational efficiency, intelligence gathering and rapid response capability. Sarawak Coastguard currently operates a total of 12 vessels of various classes.
To further enhance its operational capabilities, SSEU has acquired three new 40-meter Beting Class Patrol Vessels designed for operations in rough sea conditions and equipped with advanced navigation and communication systems which will be launched soon. These vessels offer enhanced endurance capabilities to strengthen maritime security and support the protection that will further strengthen monitoring and patrols throughout the waters of Sarawak as well as the conservation of Sarawak’s eight Marine National Parks, including Luconia Shoals Marine National Park.
Since 2026, 122 operations were conducted comprising Search and Rescue (SAR) missions, Search and Rescue Exercises (SAREX), enforcement patrols, night patrols, integrated operations and the water event security. The team has inspected 77 vessels and 36 fish cages involving 327 individuals. In terms of enforcement, Sarawak Coastguard has carried out nine enforcement actions, comprising two arrest cases, the issuance of one summons, and the submission of six reports to the relevant agencies.
In addition, Sarawak Coastguard has conducted 174 educational activities, community outreach programmes, and advisory sessions in collaboration with the Sarawak Rivers Board. As of September 2026, there has been an increase in engagement activities involving school students and fishing communities, with a total of 261 activities recorded compared to 161 activities in 2025.
Strengthening Rabies Prevention and Control in Sarawak Border
Tuan Speaker, I wish to provide a progress report on our strategic offensive against Rabies. As of October 2026, the Immune Belt Enforcement Team (IBET) has successfully vaccinated 13,616 dogs along the Sarawak-Indonesia border and achieving a 94.33% herd immunity target to prevent cross border transmission.
In 2027, RM671,000.00 has been allocated to support rabies prevention and control efforts along Sarawak’s land border with Indonesia. The allocation will be utilised for the procurement of anti-rabies vaccines for dogs, essential supplies for targeted dog removal operations, the other operational equipment including syringes, gloves, and related necessities.
This funding is critical to sustaining IBET’s frontline operational capabilities, strengthening rabies prevention and control measures in border areas, and supporting the Sarawak State Government’s continued efforts to eliminate rabies in Sarawak.
Now, Tuan Speaker, I proceed with matters relating to the Human Resource Development and Management Unit.
Human Resource Development And Management Unit (Hrdmu)
Diversity and Inclusivity in the Sarawak Civil Service
I would like to thank the Honourable Member for Kota Sentosa for his proposal to strengthen diversity and inclusivity of the Sarawak Civil Service. The Sarawak Government remains committed to ensuring equitable opportunities for qualified Sarawakians based on merits. In this regard, the Human Resource Development and Management Unit will continue to enhance the competencies, leadership capabilities, and professional development of civil servants through targeted training and continuous learning initiatives.
The proposal by the Honourable Member for Kota Sentosa regarding the Sarawak Diversity and Inclusion Framework is duly noted. The Sarawak Government remains committed to upholding merit, competency and integrity for all eligible Anak Sarawak in the Sarawak Civil Service.
CONCLUSION
Tuan Speaker, I would like to express my appreciation to Tuan Speaker for your leadership in conducting the smooth proceeding of the Dewan sitting. I would also like to thank the State Secretary, State Attorney-General, State Financial Secretary, Federal Secretary, Deputy Ministers in the Department of the Premier of Sarawak, Heads of Department, DUN Staff and all officers involved in making this Dewan sitting a success.
Before I end my speech, I wish to convey Happy Deepavali greetings to those celebrating, Merry Christmas to all Christians in this August House and outside, and a happy and prosperous New Year 2027 to everyone. With these words, I hereby support the motion on the Supply (2027) Bill, 2026.
Sebelum mengundur diri, saya ingin menyampaikan dua rangkap pantun:
Belanjawan 2027 melonjak tinggi, Dibentang berhemah YAB Datuk Patinggi, Rangkumkan seluruh anak negeri, Gemilang dan megah, Satria Pertiwi. ... (Applause)...
Selesai sudah giliran kami, Usul rakyat dibahas teliti, Berkhidmat berbakti demi negeri, GPS gah, YAB Premier disanjung tinggi. ... (Applause)...
Thank you, Tuan Speaker.
Honourable Members, with respect, I invite the Honourable Dato Sri Lee Kim Shin, Minister of Transport, to deliver the winding-up speech.
Thank you, Mr Speaker. Good afternoon, greetings of peace, greetings of Sarawak Maju Makmur and greetings of Segulai Sejalai.
Speech of Appreciation
On behalf of the entire staff of the Sarawak Ministry of Transport, I extend my highest respect and congratulations on the celebration of the 80th Official Birthday of Tuan Yang Terutama Yang di-Pertua Negeri Sarawak, Tun Pehin Sri Dr. Haji Wan Junaidi bin Tuanku Jaafar. May Tun Pehin Sri and the Yang Amat Berbahagia Toh Puan Datuk Patinggi Hajah Fauziah binti Mohd Sanusi always be blessed with good health, well-being, happiness and the blessings of peace in accompanying every step of life.
His wide experience and outstanding record of service in the fields of security, law, administration and leadership not only shape the pillars of Sarawak's development, but Tuan Yang Terutama's role as Yang di-Pertua Negeri also remains a symbol of sovereignty, stability and the unity of the people. At the same time, it safeguards harmony and strengthens the solidarity of a multiracial and multireligious society in order to realise a Sarawak that is progressive, prosperous, inclusive and harmonious.
I wish to record my highest appreciation, congratulations and wholehearted respect to the Honourable Premier of Sarawak. Under the visionary and dynamic leadership of YAB Premier, Sarawak continues to write a history of achievement that is very proud in efforts to drive this region towards the status of a developed high-income region by 2030.
Passing of Bills 2026
Tuan Speaker, before proceeding further, I wish to acknowledge the passing of the following Bills by this August House during the current sitting:
(a) Sarawak State Library (Amendment) Bill, 2026; (b) Public Holidays (Amendment) Bill, 2026; and (c) Supplementary Supply (2026) Bill, 2026.
The passing of these Bills reflects our GPS Government's continued commitment to strengthen governance and keep Sarawak's laws responsive to current needs, contributing to Sarawak's continued development and the well-being of our rakyat.
Supply Bill 2027Bill
Tuan Speaker, I wish to express my full support for the Sarawak Budget 2027 presented by the Right Honourable Premier of Sarawak. I congratulate the Right Honourable Premier on a Budget that responds to the needs of our rakyat while preparing Sarawak for the opportunities ahead, under the theme, “Together Building Prosperity and Securing Our Futures”. This theme reflects our responsibility as the GPS Government to turn Sarawak’s resources and investments into lasting benefits for our people.
Under the Right Honourable Premier’s leadership, the 2027 Budget projects revenue of RM15.091 billion, 11.2% higher than the 2026 revised projection of RM13.571 billion, and a surplus of RM246 million. This reflects prudent financial management while sustaining Sarawak’s development and expanding opportunities for our rakyat. Budget 2027 addresses both immediate pressures and long-term needs. It supports families with living costs today while investing in the education, infrastructure, economic opportunities that will secure Sarawak’s future.
Strengthening Infrastructure and Expanding Opportunities
I fully support the allocation of RM10.098 billion for development expenditure in 2027, while RM6.4 billion for rural development. This investment must bring essential services and economic opportunities closer to rural communities. Every Sarawakian deserves a fair chance to prosper, wherever they live.
The RM2.27 billion allocated under Alternative Funding for major road infrastructure will strengthen Sarawak’s transport backbone. Together with investments in ports, aviation and riverine safety, this will facilitate the movement of people and goods across Sarawak and provide communities with better access to markets and essential services.
The Sarawak Ports Master Plan study and the proposed development of a new Kuching International Airport will support a more integrated transport and logistics network, strengthening trade, tourism and local businesses development. Better connectivity must translate into wider economic participation and improve household incomes.
Advancing Technology and Environmental Sustainability
Tuan Speaker, I strongly support the Right Honourable Premier’s emphasis on digital connectivity, artificial intelligence and innovation. These investments will help Sarawak improve public services and develop new industries. In transport, technology can make journeys more reliable, improve planning and help businesses move goods more efficiently.
The allocation of RM988 million under Alternative Funding for the development of Kuching Urban Transportation System (KUTS) demonstrates the government’s commitment to applying cleaner technology and advancing sustainable urban mobility. The budget’s approach to carbon markets supports responsible environmental management and new economic opportunities. The RM10 million for Phase 2 of the Green Gas Management System will strengthen emissions measurement and reporting, while supporting carbon credit management and the carbon registry.
The circular economy offers further opportunities to create value through more efficient use of resources. The Budget’s support for converting agricultural waste into alternative animal feed will help reduce reliance on imported inputs and turn discarded materials into productive resources. The Sarawak Blue Economy Master Plan complements these efforts by linking maritime development with environmental protection. Our rivers and coastal waters support transport, fisheries and tourism. Their sustainable management will help safeguard livelihoods while creating opportunities for future generations.
Investing in Our Rakyat through Education
Tuan Speaker, the infrastructure and industries we are developing will require capable Sarawakians to operate, manage and improve them. The Right Honourable Premier’s emphasis on education and human capital will help Sarawakians take an active role in our expanding industries. Our ambition is to equip our people to lead Sarawak’s transformation and share in its opportunities.
The RM200 million allocation the Free Tertiary Education Scheme in 2027 will support eligible Sarawakian students pursuing approved programmes at Curtin University Malaysia, Swinburne University of Technology Sarawak Campus, University of Technology Sarawak and i-CATS University College. Introduced in 2026, the scheme covers tuition fees and eases the burden on families. Together with technical and vocational education, and training, and closer industry collaboration, this investment will equip our young people with the knowledge, skills and confidence to build rewarding futures here at home.
The RM10 million for the Free School Bus Programme will help children from underprivileged households reach school. Alongside assistance for laptops, learning materials, living expenses and journeys home, this support will make education more accessible and ease the burden on families.
Safeguarding the Well-Being of Our Rakyat
Tuan Speaker, while we invest for the future, we remain attentive to the pressures households face today. The RM650 million allocation for Sumbangan Keperluan Asas Sarawak, the continuation of the 25% discount on domestic electricity bills in 2027, and other targeted assistance will help families meet basic needs and manage living costs. In addition, the RM8.5 million allocation for the Sarawak New Stage Bus Service, Sibu and Stage Bus Operational Subsidies Programme in 2027 will help keep public transport affordable, leaving households with more income for food, education and other essentials.
I wish to acknowledge the Right Honourable Premier’s leadership and continued support in advancing Sarawak’s transport development. My ministry remains focused on delivering our programmes and completing ongoing projects so that the Budget’s allocations translate into reliable services and lasting benefits for the rakyat.
I, therefore, give my full support to the Supply Bill 2027 presented by the Right Honourable Premier. In the spirit of “Together Building Prosperity and Securing Our Futures”, let us sustain this progress and ensure that Sarawak’s development brings greater security and opportunity to our rakyat.
Tuan Speaker, I would now like to touch on matters relating to my ministry, beginning with the global trends shaping our plans for Sarawak.
Global Development in Transport
Across the world, land transport is moving towards intelligent, connected and low-carbon systems. Artificial Intelligence (AI), digitalisation, automation and green energy are being applied to traffic management, route optimisation, freight consolidation, real-time tracking, fleet operations, road safety and predictive maintenance. These technologies are improving efficiency and reliability while reducing congestion, emissions and transport costs.
The maritime and riverine transport sector is also undergoing a similar transformation. Data-sharing, automation AI and advanced vessel monitoring are improving coordination, navigational awareness and operational safety. The adoption of cleaner fuels such as liquefied natural gas, methanol, ammonia and hydrogen alongside energy-efficient technologies is gaining momentum as the shipping industry works to reduce carbon emissions. International cooperation, skilled seafarers and resilient supply chains remain essential to safe, reliable and sustainable maritime operations.
The aviation industry is also transforming through AI, automation, digitalisation and sustainable technologies. Leading aviation hubs such as Singapore, Dubai, Seoul and Amsterdam have demonstrated how innovation, modern infrastructure and skilled human capital can improve aircraft maintenance, air traffic management, airport operations, passenger services and safety.
Furthermore, the emerging Low Altitude Economy (LAE) is creating new opportunities through Unmanned Aerial Vehicles (UAVs), commonly known as drones, and other advanced air-mobility systems. These technologies have potential applications in medical deliveries, agriculture, forestry and environmental monitoring, particularly in areas with limited access. Their safe and effective deployment will require strategic industry collaboration, human capital development, robust regulatory oversight and strong cybersecurity measures.
Sarawak Transport Sector
Tuan Speaker, Sarawak Transport Sector. These global trends provide a useful reference as Sarawak develops transport solutions suited to our geography and the needs of our people and economy. Since its establishment, my ministry has worked to strengthen connectivity, modernize transport services and improve safety across all modes of transport. Allow me now to update this august House on the progress achieved and the initiatives underway.
Land Transport And Logistic Sector
Sustainable Urban Transport: The Kuching Urban Transportation System
Tuan Speaker, the KUTS Project commenced in November 2022 with the Rembus Report as its first component. Since then, the project has achieved significant advancements. As of September 2026, the overall physical progress of KUTS Phase 1 stands at 49%, against a planned progress of 53%. Comprising the Blue, Red, and Green Lines and supported by the Rembus Hydrogen Plant, once completed, KUTS will provide an integrated public transport network for Kuching.
The system will provide a more sustainable transport alternative, ease traffic congestion, reduce carbon emissions, and support the objectives of the Sarawak Integrated Transport Master Plan. Pilot operations to test the Autonomous Rapid Transit (ART) system are targeted to begin by the end of this year along the Blue Line Phase 1 alignment from Rembus to Northbank.
This line has currently achieved 88% physical progress against a planned progress of 97%. The first two ART units have arrived in Kuching, with another two expected by the end of this year. During this phase, contractors and operators will assess the system’s performance, safety and operational readiness, and address any shortcomings before commercial operations begin. While the Blue and Red Lines construction is progressing, the Green Line will be implemented soon, with construction expected to commence in the first quarter of 2027.
Green Transport: Electric Vehicle
Tuan Speaker, Green Transport: Electric Vehicle. Electric vehicle or EV adoption in Sarawak is gradually gaining momentum, reflecting growing public interest in sustainable mobility. Supported by government initiatives, increasing availability of EV models and expanding charging infrastructure, Sarawak is progressively embracing cleaner transport choices. According to the Road Transport Department (JPJ), of the 56,452 motorcars registered in Sarawak between 2021 and 2026, a total of 1,334 were electric cars, representing approximately 2.36% of total motorcar registrations, or ratio of approximately one electric car for every 42 motorcars registered.
In terms of charging infrastructure, as of September 2026, a total of 215 electric vehicle chargers had been installed across Sarawak, comprising both alternating current and direct current chargers. The continued expansion of charging facilities will help improve accessibility and convenience for EV users. The increasing adoption of EVs also supports Sarawak's broader aspirations towards a low-carbon transport sector and Malaysia's transition towards sustainable mobility.
Improvement to Public Transport Services
Tuan Speaker, Improvement to Public Transport Services. After two years of operation, the 14 units of the New Smart Bus Service in Miri continue to serve commuters across eight routes, providing a reliable, accessible and modern public transport option for the community. Through the Sarawak Smart Transport Application (SSTA), commuters are able to track buses in real time, while the operational data generated from the service enables the Ministry to better understand travel patterns and continuously improve route planning and scheduling.
I am pleased to inform this august House that as of September 2026, the service has recorded more than RM1.82 million ridership. The average monthly ridership from January to September 2026 was 83,075 passengers. This is a significant milestone and reflects the growing confidence and acceptance of public transport among the people of Miri. Building on this momentum and improvement efforts, Sibu will be the next town to undergo public transport modernisation.
The Sarawak Government will introduce a zero-fare stage bus service with the introduction of 13 units of new smart electric buses serving Sibu town area including Sibujaya, Kemuyang, Ulu Sungai Merah, Rantau Panjang, Lower and Upper Lanang in the first quarter of 2027. The Stage Bus Service Transformation (SBST) in Kuching, also known as BAS.MY, is a Federal Government initiative implemented in collaboration with my Ministry. Since its launch in March 2025, the service has operated 59 new buses across 13 routes, carrying over 1.29 million passengers as of September 2026. The average monthly ridership in 2026 is 82,204 passengers. Commuters can also use the BAS.MY journey planner application to plan their trips. Road Safety Initiatives
Tuan Speaker, Road Safety Initiatives. According to the Royal Malaysia Police (PDRM), Sarawak recorded 16,776 road accidents from January to September 2026. Of these, 293 accidents were fatal, resulting in 321 deaths, 106 were serious accidents, 171 were minor accidents, while the remaining 16,206 involved vehicle damage only. The data shows that motorcars were involved in more than half of all accidents, followed by four-wheel drive vehicles and motorcycles. During the same period, PDRM issued 90,556 summonses for major traffic offences in Sarawak. These included 88,189 for speeding, 802 for using mobile phones while driving, 528 for running red lights, 270 for crossing double lines and 767 for cutting queues.
Meanwhile, as of September 2026, JPJ Sarawak has recorded a total of 4,547 summons for major traffic offences. The most frequent violation was not wearing a seatbelt or helmet, amounting for 2,927 summonses. Heavy vehicle offences were also significant, with 900 summonses issued for carrying dangerous goods and 246 summonses for overloading. Among other violations, JPJ logged 199 summonses for running red lights, 160 for using a mobile phone while driving, 77 for crossing or overtaking on double lines, 33 for cutting queues and five for driving on the emergency lane. These figures show the need for greater awareness and more responsible driving among road users.
To address this issue, my Ministry continues to work closely with the Sarawak Road Safety Council including PDRM, the Road Transport Department, the Public Works Department Sarawak and other relevant agencies. These efforts include road safety awareness campaigns during festive seasons especially along major roads and the Pan Borneo Highway.
In addition, Sarawak Traffic Games which have been organising since 2024, have benefited a total of 720 students across Sarawak. Similarly, the Transport Awareness Behavioural Change (T-ABC) Programme implemented since 2022 has reached approximately 1,500 students across six divisions, further reinforcing the Ministry’s commitment to foster responsible road user behaviour among the younger generation.
Maritime and Riverine Transport Sector
Aids to Navigation
Tuan Speaker, Maritime and Riverine Transport Sector, Aids to Navigation (AtoNs). As of 31st August 2026, Sarawak has 299 aids to navigation to guide vessels along major rivers and specified water bodies. Of these, 82 were in the Kuching region, 152 in Sibu and 65 in Miri. The installations comprised of 17 navigation buoys, 23 beacon lights, 21 transit lights, 17 bridge lights, 93 bridge daymarks and signs and 128 riverine traffic signages. These AtoNs support safer river journeys, helping boat operators navigate channels and bridge crossings while protecting passengers, cargo and communities that depend on river transport.
Remedial Works at Kuching Barrage and Shiplock
Tuan Speaker, Remedial Works at Kuching Barrage and Shiplock. On 13th March 2026, the Prime Minister Datuk Seri Anwar Ibrahim announced RM150 million in Federal funding for urgent remedial works at the Sungai Sarawak Barrage to address erosion. This allocation supports efforts to protect the barrage and its flood-mitigation function. This project will be implemented by the Department of Irrigation and Drainage Malaysia.
River Transport Permit
Tuan Speaker, River Transport Permit. From 2022 to 2026, Sarawak Rivers Board has received a total of 6,460 River Transport Permit applications, comprising 526 new applications and 5,934 renewals. This permit allows boat operators to charge for transporting passengers and goods on gazetted rivers. It helps ensure that boats have the required licences, safety equipment and insurance.
From 2022 to 2025, a total of 293,319 passenger boat arrivals and departures were recorded and 3,482,920 passengers used SRB’s facilities. SRB’s wharf served 11,408 cargo vessels and handled 1,230,203 tonnes of cargo. Anchorage areas recorded 93,175 cargo vessel visits.
From January to August 2026, SRB recorded 52,365 passenger boat arrivals and departures, 389,454 passengers, 2,066 cargo vessels, 182,673 tonnes of cargo and 15,117 anchorage use. These records demonstrate the role of SRB in supporting passenger travel, cargo movement and vessel operations across Sarawak’s waterways.
Marine and Riverine Enforcement
Tuan Speaker, from 2022 to 2025, the Marine Department Malaysia Sarawak Region conducted 157 enforcement operations and issued 214 compounds, while the Sarawak Rivers Board issued 327 compounds. In 2026, Marine Department issued 39 compounds from January to September, while SRB issued 107 compounds from January to August.
The enforcement activities include patrols, vessel inspections, and joint operations with other agencies to uphold maritime and riverine transport requirements to meet safety requirements. The figures reflect enforcement across the three regions, alongside efforts to encourage responsible conduct among users and maintain orderly transport for communities, passengers and operators who depend on Sarawak’s waterways for their daily activities.
Aviation Sector
Sarawak Air Connectivity
Tuan Speaker, for the information of this august House, as of the third quarter of 2026, Sarawak recorded an increase in aircraft movements from 90,831 to 93,798, representing a growth of 3.27%, while passenger movements increased from approximately 7.14 million to 7.4 million, an increase of 3.61% compared with the corresponding period in 2025. Sarawak also recorded an average of 56 weekly international flights and 415 weekly domestic flights from other Malaysian states. Within Sarawak, an average of 612 weekly flights connected major cities and rural areas including the Rural Air Services.
My ministry continues to work closely with airlines and relevant stakeholders to facilitate the introduction of new routes, the resumption of air services and increases in flight frequencies, further strengthening air connectivity. In line with these efforts, AirAsia is scheduled to resume selected routes and increase flight frequencies on several domestic and regional services from November 2026. Batik Air is also scheduled to introduce new services connecting Subang with Sibu and Miri from December 2026. These developments are expected to provide passengers with more travel options and strengthen connectivity within Sarawak, between Sarawak, Sabah and Peninsular Malaysia and with regional destinations.
Development of AirBorneo
Tuan Speaker, the establishment of AirBorneo, which commenced operations on 1st January 2026, marks a defining milestone in Sarawak’s aviation journey, empowering Sarawak to drive its own air connectivity agenda in line with the Post COVID-19 Development Strategy 2030. AirBorneo commenced scheduled jet services between Kuching and Kuala Lumpur on 20th July 2026 with two daily flights, followed by Kuching–Singapore services on 22nd July 2026, marking its first international route. Both routes are operated as full-service flights on Boeing 737-800 aircraft, with business class and economy class cabins and Sarawak's own delicacies served on board. I am pleased to inform this august House that AirBorneo has already surpassed the milestone of carrying more than 50,000 passengers, even as its commercial jet operations approach the first 100 days of service. This is an encouraging early indication of the demand for direct air links to and from Sarawak, and of the confidence the travelling public has placed in Sarawak's own airline. AirBorneo is also preparing to launch services between Kuching and Jakarta soon, which will give Sarawak direct air connectivity to three capital cities in the region.
We also appreciate the Federal Government’s continued support for Rural Air Services (RAS), with the RM209 million allocation announced by the Prime Minister under Budget 2027.As discussions on the way forward continue, our priority remains to ensure the sustainability of these essential services and reliable air connectivity for rural and remote communities across Sarawak, Sabah and Labuan. AirBorneo also remains committed to advancing Sarawak’s essential rural connectivity by securing a firm order for eight new ATR72-600 aircraft, together with purchase rights for four additional aircraft. Scheduled for delivery between 2027 and 2029, the fleet renewal will modernise Rural Air Services and strengthen reliable access to remote and underserved communities across Sarawak, Sabah and Labuan.
Moving forward, in 2027, AirBorneo will introduce commercial routes, connecting Kuching with other major towns in Sarawak and Kota Kinabalu, by reviewing and expanding its network based on passenger demand and connectivity needs, subject to aircraft availability.
Development of New Kuching International Airport
Tuan Speaker, in line with global developments, the Sarawak Government envisions the proposed New Kuching International Airport at Tanjung Embang and its integrated Aerotropolis as a modern, smart and sustainable aviation hub. The development is envisaged to incorporate AI-enabled passenger processing cargos, smart logistics, digital technologies and aerospace facilities, while promoting tourism, trade, investment and talent development to strengthen Sarawak's aviation industry.
My ministry has submitted the Airport Development Request (ADR) on 26th May 2026 to the Ministry of Transport Malaysia for approval in accordance with the relevant provisions of the Civil Aviation Act 1969.
Miri Airport Upgrading Project
Tuan Speaker, my ministry continues to work closely with the Federal Government, through the Ministry of Transport Malaysia and JKR Malaysia, on the Miri Airport upgrading project. Following continuous engagement by my Ministry with various agencies, the project ceiling has been approved at RM445 million. The upgrading will increase the airport’s passenger handling capacity from 2 million to 4 million passengers per annum, while enhancing its overall facilities and operational capability.
In addition, JKR Malaysia, as the implementing agency, will incorporate Sarawak’s unique cultural heritage and rich ethnic heritage into the airport’s design, while ensuring that it meets modern airport standards and operational requirements. The Value Engineering (VE) process was completed in August 2026. The tender process is currently ongoing, with construction targeted to commence in the second quarter of 2027 and completion expected by 2030.
Upon completion, the upgraded Miri Airport will further strengthen its role as the northern gateway to Sarawak, enhancing air connectivity and supporting future passenger growth and regional economic development.
Long Banga and Ba'kelalan STOLports Upgrading
Tuan Speaker, following continuous engagement and technical assessments by my Ministry with the Ministry of Transport Malaysia, the Federal Government has approved the upgrading project for Long Banga and Ba'kelalan STOLports for the year 2027 under the Airport Development Fund (ADF). The upgrading will include improvements to the terminal facilities and where feasible, runway improvements or extensions, subject to site conditions and technical assessments. These improvements are expected to enhance operational capability, flight safety and air connectivity for the surrounding rural communities.
Other Airport and STOLport Developments
Tuan Speaker, other ongoing airport development initiatives across Sarawak, including the upgrading of Limbang Airport, Bario STOLport, the proposed development of Lawas Airport and Bebuling STOLport, are currently progressing as scheduled. These initiatives represent our continued commitment to strengthening and modernising Sarawak’s aviation infrastructure.
Long Lellang Helicopter Crash Incident
Tuan Speaker, on a solemn note, I wish to place on record the profound sadness of the people of Sarawak following the tragic helicopter crash involving a Layang-Layang Aerospace helicopter under the registration of (9M-LLF), which was operating the Flying Doctor Service at Long Lellang on 8th September 2026. This tragic incident claimed the lives of five individuals, comprising one pilot and four medical personnel who were entrusted with the noble responsibility of delivering essential medical services to our rural and remote communities.
On behalf of my ministry, I wish to convey our deepest condolences and heartfelt sympathies to the bereaved families. We also extend our sincere appreciation to all relevant rescue agencies and parties who have rendered assistance and support in the aftermath of this tragedy.
For the information of this august House, the Preliminary Investigation Report on the Long Lellang helicopter accident has been published by the Air Accident Investigation Bureau (AAIB) on 16th October 2026 and presented to the Federal Cabinet by the Minister of Transport Malaysia. The report outlines the preliminary findings, and the safety investigation remains ongoing, with further technical examinations and analysis of evidence being undertaken to establish the circumstances and contributing factors of the accident. The cause of the accident has not yet been determined, and the Final Report is expected to be completed within one year from the date of the accident.
Tuan Speaker, I now turn to the specific issues raised by Honourable Members.
Response To Specific Issues Raised By Honourable Members Of Dun
The Honourable Member for Stakan
For the information of the Honourable Member for Stakan, through the Program Bantuan Lesen Memandu (BLM/MyLesen) Kelas B2, the Road Transport Department (JPJ), in collaboration with my Ministry and the Members of Sarawak Legislative Assembly (ADUN) and Members of Parliament, has undertaken efforts to assist the public in obtaining motorcycle licences at minimum rates. Under this initiative, participants are required to pay only a minimum rate of RM250.00 instead of the normal rate of RM750.00.
This programme not only alleviates the financial burden on the people, particularly the target groups, but also ensures that every participant undergoes the required training and assessments conducted by JPJ. This is essential in producing competent and disciplined motorcyclists who prioritise road safety. The programme is open to eligible Malaysian citizens, those aged 16 and above who do not yet possess a driving licence. Currently, it has benefitted 43,533 participants in Sarawak, since its implementation in 2024.
For 2026, a total of 29 programmes has been targeted for implementation in Kuching, Serian, Sri Aman, Betong, Sarikei, Sibu, Mukah, Bintulu and Miri Division through collaboration between JPJ and the ADUN and MP. To date, 15 programmes have been successfully implemented throughout Sarawak, while the remaining programmes are ongoing and are expected to be completed by December 2026.
Consequently, the programme in the P.197 Kota Samarahan parliamentary constituency is expected to conclude in November 2026. The public may apply for the programme by submitting their applications through their respective ADUN or MP. Therefore, I hope that the cooperation among all parties, especially the ADUN and MP will continue to ensure that more people benefit from this initiative.
Tuan Speaker, the Honourable Members for Ba’Kelalan, Batu Danau and Tanjong Batu. For the information of the Honourable Members for Ba’Kelalan, Batu Danau and Tanjong Batu, my ministry recognises the importance of reliable air connectivity in supporting the socio-economic development of Lawas, Limbang, Bintulu and other parts of Sarawak.
My ministry will continue to engage with AirBorneo and other relevant airline operators to explore opportunities to enhance flight frequencies, improve schedules and strengthen regional connectivity. Any proposed new routes or additional services will require careful assessment by the respective airlines, taking into account passengers demand, commercial viability, aircraft availability, airport readiness and the necessary regulatory and operational approvals. For Rural Air Services routes, any proposed changes to aircraft operations or additional services will require further technical studies and assessments by the Civil Aviation Authority of Malaysia (CAAM), as well as the necessary approval from the Transport Ministry of Malaysia.
Tuan Speaker, I would like now to respond to the Honourable Member for Padungan. I wish to respond to the Honourable Member for Padungan wish called upon the Sarawak Government to abandon the proposed New Kuching International Airport and other major strategic infrastructure projects, simply because of their substantial development costs. I find the Honourable Member's argument not only short-sighted but a glaring example of political double standards. Talking about being short-sighted, this reminds me of the strikingly argument made by his ... (Interruption)...
... (Inaudible)...
Member for Pending. The Honourable Member for Padungan gave his view. The Minister is responding. Let him respond first, then you raise your counter response. Give him the opportunity to respond first.
... (Inaudible)...
What standing Order?
... (Inaudible)...
What Standing Order?
... (Inaudible)... Tuan Speaker, I am standing on Standing Order 32 (6), when the Padungan is not here in this House, the Honourable Minister are trying to do the attack. He moved the Motion to remove him and now he is attacking him without his defence in this House ... (Interruption)...
No. No. I am only responding, only responding ... (Interupption)...
Hold on ... (Interupption)...
Tuan Speaker, you should stop him from raising the attack in this House, uphold the dignity of this House and the fairness of this House, shouldn't allow him to do that. If he wants to answer, why he removed, why he removed Padungan? This is not called strength; this is called political coward. This is called ... (Interruption)...
No, No, I ... (Interruption)...
Cheapskate at the lowest standard ... (Interruption)...
I object to the word ‘coward’ ... (Interruption)...
Tuan Speaker, please stop him ... (Inaudible)...
Overruled. Proceed.
Ya, Tuan Speaker, I want her to withdraw the word ‘coward’... (Interupption)... No,no it’s not. Now, now can you please sit down and let me explain. It is a decision of the Dewan and it is not a personal decision. It's a decision of 62 ADUN here. It's not a personal decision.
Proceed, proceed.
... (Inaudible)...
Ya. Ya. Tuan Speaker, I want her to remove and withdraw the word ‘coward’.
... (Inaudible)...
No. It is not.
... (Inaudible)...
No, now can you please sit down? Let me explain.
... (Inaudible)...
It’s not. It is the decision of the Dewan.
... (Inaudible)...
It is not a personal decision. It is a decision of 62 ADUNs here ... (Interruption)...
... (Inaudible)...
Proceed, proceed ... (Interruption)...
... (Inaudible)...
So please don't make any accusations here ... (Interupption)...
... (Inaudible)...
Now, please Tuan Speaker. Could you ask her to sit down ... (Interruption)...
... (Inaudible)...
Proceed, proceed ... (Interruption)...
And let me proceed? ... (Interruption)...
Proceed, proceed. Please sit down.
... (Inaudible)...
Please sit down. Proceed, proceed. Proceed.
... (Inaudible)...
Proceed, proceed. Proceed. Proceed.
I would like her to withdraw the word ‘coward’.
…(Inaudible)...
It is impermissible.
... (Inaudible)...
Alright. The Minister asks you to withdraw the word coward. Are you withdrawing or not?
... (Inaudible)...
No. I'm asking... (Interruption)...
Either yes or no? ... (Interruption)...
... (Inaudible)...
Are you withdrawing or not?
... (Inaudible)...
Okay.
I am not. I am not going to withdraw because he is a political coward. He moved the Motion. He removed him and now he attacked behind him. Is he not a coward? ... (Interruption)...
Point of order ... (Interruption)...
Is he not a coward? ... (Interruption)...
Ya, Point of order ... (Interruption)...
He is a coward ... (Interruption)...
Point of order.
... (Inaudible)...
Okay. You can move that Motion. Ya.
... (Inaudible)...
Ya. Ya.
Tuan Speaker, may I address this particular House? I don't think the Minister should move the Motion to remove the Member for Pending because this is political theatrics on her part. She wants to get kicked out from this Dewan. Then the minute she gets kicked out from the Dewan, we have got another set of videos coming out saying that this particular Dewan bullies her. So, this is just political theatrics. In any event, let this House record that the word ‘political coward’ you are doing a show and that is not right under Standing Order 32(4) ... (Applause)... Let it be recorded in this Dewan.
... (Inaudible)...
Minister, proceed ... (Interruption)...
32(4) is unparliamentary language.
... (Inaudible)...
Proceed.
Tuan Speaker, talking about being short-sighted, this reminds me of a strikingly similar argument made by his own party's veteran leader, Tan Sri Lim Kit Siang, nearly three decades ago during the development of the Kuala Lumpur International Airport when he labelled it as a financial burden for our country.
Can you imagine what will happen today if KLIA was not developed and we stick to Subang Airport like what he proposed? The airport, KLIA, that the DAP veteran once called a white elephant is today handling 63.3 million passengers annually... (Applause)... The Penang DAP Government has championed the Penang South Islands reclamation project, involving billions of ringgit, while the Mutiara Line Light Rail Transit project carries a budget ceiling of RM16.8 billion...(Applause)… These projects are defended on the grounds of improving connectivity, attracting investments and preparing Penang for future growth. Has the Honourable Member for Padungan ever demanded that the Penang Government led by DAP abandon its multi-billion-ringgit reclamation project?
…(Inaudible)…
Has he called for the cancellation of the Mutiara Line project because of its enormous cost? If these projects can be justified as long-term investments for Penang, why should the New Kuching International Airport not be regarded as a long-term investment for Sarawak? .... (Applause)…
…(Inaudible)…
Sarawak must not be denied the same right to develop, modernise and prosper as other states in Malaysia. We are almost the same size as the whole of Peninsular Malaysia with vast geographical distances, growing economic activities and communities that depend heavily on air connectivity that is still lagging behind. Our airport is not merely a building to accommodate passengers.
It is a strategic gateway for tourism, international trade, investments, air cargo, aviation services and Sarawak's future economic growth. Instead of asking the Sarawak Government to cancel this project, the Honourable Member for Padungan should use his position as a Member of Parliament to advocate federal support for major infrastructure projects in Sarawak... (Applause)…
…(Inaudible)…
In the Honourable Member, five terms of tenure until now as an elected Member of Parliament, has he ever succeeded in securing any funding from the Federal Government who major infrastructure projects in Sarawak?
The Honourable Member has suggested spending a few hundred million ringgit to upgrade the existing Kuching International Airport instead. Such a proposal may sound attractive in the short term, but it fails to address the fundamental need for long-term aviation infrastructure planning.
Simply expanding the existing terminal does not automatically resolve limitations involving runway capacity, aircraft movements, airside infrastructure, cargoes facilities, maintenance repair and overhaul facilities and future expansion due to the existing Kuching International Airport having limited land size. Besides, having an airport in the middle of the city limits the development of high-rise buildings within the surrounding areas.
The proposal to build this airport is supported by a feasibility study undertaken by Netherlands Airport Consultants (NACO), a global airport consultant and engineering firm with 75 years of experience in airport planning and development, involvement in more than 750 airports worldwide, which collaborate with our local consultant, Jurutera Jasa Sdn. Bhd.
NACO's extensive international experience also includes major aviation hubs such as Amsterdam Schiphol, Singapore Changi, Incheon and Hamad International Airport. The completed study has concluded that Tanjung Embang is technically and operationally feasible for the proposed airport development.
The feasibility study projects that NKIA could contribute approximately RM1.8 billion annually to Gross Domestic Product (GDP) by 2050 under the high-growth scenario, while supporting approximately 37,919 full-time equivalent jobs across the wider economy. During construction, Phase 1 could also support around 9,393 jobs annually over the projected six-year construction period.
New Kuching International Airport has the potential to create wider opportunities in tourism, aviation services and supporting industries such as air cargoes, aircraft Maintenance, Repair and Overhaul (MRO), aircraft parts manufacturing as well as the development of aerotropolis. The study also projects that increased passenger traffic could generate RM3.99 billion in tourism receipts by 2050. These benefits could attract new investments, strengthen local businesses, create employment opportunities and stimulate economic growth across Sarawak.
We must plan not merely for the needs of today or just the next few years, but for the Sarawak of the next 35 to 50 years. The proposed New Kuching International Airport at Tanjung Embang is envisioned as a strategic catalyst for aviation-related industries, logistics, tourism, investment and economic development.
Building on the completed feasibility study, the project’s scope and implementation structure will be assessed against market demand, technical and regulatory requirements and financial viability. Funding options include Public-Private Partnerships (PPP), Private Finance Initiatives (PFI) and Joint Ventures (JV). It is not necessary to be fully funded by the government.
Tuan Speaker, turning to KUTS, I wish to firmly reject the Honourable Member for Padungan’s proposal to halt further development of the Autonomous Rapid Transit (ART) system and convert its dedicated infrastructure into lanes for private cars and buses. Such a proposal may appear to offer a convenient solution to today’s traffic congestion. However, it does not address the fundamental question before us. How do we move more people efficiently, rather than simply accommodate more vehicles on our roads?
Kuching needs a dependable, high-capacity public transport system that provides a genuine alternative to private vehicles. Converting dedicated public transport corridors into general traffic lanes would undermine the very purpose for which this infrastructure is being developed. The Kuching Urban Transportation System is planned to transform the way people move around Kuching. It is designed to encourage public transport use, reduce dependence on private vehicles, reduce road accidents and improve urban mobility through an integrated transport network.
The ART system will operate on dedicated lanes, allowing it to avoid much of the congestion affecting general traffic and providing a stronger foundation for reliable journey times. Complementing this backbone, feeder buses will connect residential neighborhoods and surrounding communities to the ART network, making public transport more accessible and practical for everyday commuters.
For the working population, this means having an alternative to the daily stress of driving, unpredictable journey times and hours lost in traffic. For students, senior citizens and families without access to private vehicles, it means improved access to employment, education, healthcare and other essential services.
Furthermore, our ART vehicles, including buses being powered by hydrogen will further promote green mobility which contributes to environmental sustainability. We must therefore judge KUTS by its ability to deliver long-term public benefits, not simply by the construction activities or traffic inconvenience experienced during its implementation.
Tuan Speaker, other states are pursuing their own public transport initiatives to address the mobility challenges faced by their respective urban centers. Penang is advancing its Mutiara Line Light Rail Transit (LRT) project, while Johor is pursuing the Elevated Autonomous Rapid Transit (E-ART) system. Does the Honorable Member for Padungan want Sarawak to be left behind?
Although these systems differ in technology, design and implementation, they reflect the continuing need to develop structured public transport solutions alongside conventional road infrastructure. Representatives from other states, namely the Chief Minister of Penang, State Executive Councilors (Excos) from Perak, Melaka, Selangor and Johor, have all visited Sarawak to learn about the KUTS initiative. They are very impressed with our project implementation and are considering to implement similar projects in their respective states.
These developments provide an opportunity for Sarawak to share its experience while continuing to strengthen the planning, implementation and operation of its own public transport system. The relevant lesson is not that every state must adopt the same technology, but that urban transport planning must respond to future travel demand rather than rely on expanding road capacity.
Singapore provides another example of the role of long-term public transport planning. Its development of the Mass Rapid Transit system, beginning in the 1980s, formed part of a broader strategy to support urban mobility and accommodate the needs of a growing population. Today, the MRT is a backbone of Singapore’s public transport network.
Similarly, Sarawak must consider not only its present transport challenges, but also the requirements of future generations. The objective is to establish a public transport network that can support Kuching’s continued growth and provide a viable alternative to private vehicle travel.
Tuan Speaker, prudent financial management does not mean stopping development. Fiscal responsibility means ensuring that strategic investments are properly planned, economically justified and implemented with financial discipline. We welcome constructive scrutiny of project costs and benefits. But to dismiss every major infrastructure investment simply because it involves billions of ringgit is not sound economic planning. Sarawak will not compromise its long-term development aspirations merely to satisfy short-term political arguments. We will not allow Sarawak's future to be constrained by double standard that celebrates progress elsewhere but questions progress in Sarawak.
Let me make this absolutely clear, Sarawak deserves world-class infrastructure… (Applause)… Sarawak deserves international connectivity… (Applause)… And the people of Sarawak deserve the same opportunities for progress and prosperity as the people of Penang or any other state in Malaysia… (Applause)… We are not building merely for the next election. We are planning for the next generation… (Applause)…
As we look towards 2030, we must recognize the importance of continuity in leadership, consistency in policy and stability in government to sustain Sarawak’s growth and progress. The transformation we are pursuing requires long-term commitment. Developing infrastructure, nurturing skill talent, strengthening connectivity and building new industries demand sustained investment, coordinated implementation and a clear direction.
Continuity of the GPS Government is therefore vital to carry these commitments through to completion and ensure that their benefits reach our people. Under the leadership of the Right Honourable Premier, the GPS Government shall continue to turn our development plans into lasting improvements in employment, household income, public services and quality of life. Continuity also carries a responsibility, to remain responsive to the rakyat, uphold sound governance and be accountable for delivery. We must earn the people’s confidence through our service, our decisions and the results we achieve.
Tuan Speaker, equally important, Sarawak’s continued progress rests on the unity and harmony of its people. Our diverse communities, cultures and faiths are a source of strength. Mutual respect allows us to work together, resolve differences constructively and pursue shared aspirations. We must continue to safeguard this spirit of togetherness and ensure that every community feels respected, included and valued.
Political stability gives us the confidence to plan. Political continuity enables us to deliver. Unity and harmony give us the strength to move forward together. At the same time, we must remain vigilant against opposition tactics that seek to sow doubt, create suspicion, divide our communities or misrepresent the government’s plans and initiatives. Our people deserve accurate information and constructive proposals, not distorted facts, unfounded allegations or political manipulation. Those who seek to hold the government accountable must also be accountable for their own words and actions…(Applause)…
Let us therefore sustain the continuity of our GPS Government, strengthen effective delivery and preserve the unity that binds us as Sarawakians. With our Right Honourable Premier’s transformative leadership, a shared commitment and the support of the rakyat, we can carry Sarawak’s progress forward to achieve a high-income status and secure a more prosperous future for generations to come.
CONCLUSION
Tuan Speaker, Sarawak’s transport development connects our people to essential services, businesses to markets and communities to opportunities. The progress I have outlined reflects our collective efforts to make these connections safer, more reliable and more accessible, improving the daily lives of our rakyat.
We remain mindful of the trust placed in us by the rakyat and our responsibility to serve them well. Under the leadership of the Right Honourable Premier, let us preserve the unity and political stability that have supported our progress, and build a Sarawak where prosperity is shared, opportunities are open and every community moves forward with confidence.
Tuan Speaker, before I conclude, I would like to extend my sincere thanks to the Ministry of Transport Malaysia, the Civil Aviation Authority of Malaysia (CAAM), Road Transport Department (JPJ) Sarawak, Commercial Vehicle Licensing Board (CVLB) Sarawak, Malaysia Marine Department Sarawak Region and the Royal Malaysia Police (PDRM) as well as all Sarawak Government ministries, departments and agencies, together with our industry partners and stakeholders, for their cooperation and support. My appreciation also goes to the State Secretary, State Attorney-General and State Financial Secretary for their continued support.
Lastly, I also like to thank Tuan Speaker, Deputy Speaker, and all officers and staff of Dewan Undangan Negeri Sarawak for their dedication in ensuring the orderly conduct of this august House.
Well Wishes
Tuan Speaker, dengan kesempatan ini, saya mengucapkan Selamat Hari Deepavali, Selamat Hari Krismas, Selamat Tahun Baharu 2027 dan Selamat Tahun Baharu Cina 2027 kepada seluruh rakyat Sarawak yang bakal meraikannya. Kekalkanlah semangat perpaduan dan semangat segulai sejalai demi kesejahteraan, kemajuan dan kemakmuran Sarawak.
Tuan Speaker, saya ingin mengakhiri ucapan dengan tiga rangkap pantun.
Tanjung Embang membawa kemajuan, Megah berdiri di bumi kenyalang, Pengangkutan diperkasa, ekonomi mampan, Sarawak Maju Makmur, terus gemilang …(Applause)… Kapal berlayar menuju seberang, Membelah laut seluas samudera, GPS memimpin Sarawak gemilang, Hak Sarawak terjamin, rakyat sejahtera …(Applause)…
PCDS 2030 menjadi panduan, Sokong Abang Jo, pemimpin berwawasan, Kekalkan GPS sebagai Kerajaan, Demi Sarawak maju berpanjangan …(Applause)…
Tuan Speaker, with this, I once again support the Budget for 2027 tabled by our Yang Amat Berhormat Premier Sarawak. Thank you.
Ahli-ahli Yang Berhormat, the sitting is now adjourned. And the House shall resume its sitting at 9:00 a.m. tomorrow.
(Mesyuarat ditangguhkan pada jam 4:56 petang)