LAND SWAP AGREEMENT FOR KTM STATION AND RAILWAY LANDS
Parliament of Singapore Β· 18 October 2010
Official Report, 18 October 2010, Vol 87, Issue 9 Β· Open in the reader (summaries, search, filters)
LAND SWAP AGREEMENT FOR KTM STATION AND RAILWAY LANDS: 2.
Mdm Halimah Yacob asked the Minister for Foreign Affairs (a) if he will give an update on the Memorandum of
Column: 1320
Understanding between Singapore and Malaysia; (b) what plans are being considered for the historic Tanjong Pagar site and the land along the railway tracks; (c) what are the plans to develop a rapid transit link between Singapore and southern Malaysia to be operational by 2018; and (d) what joint iconic project is being considered and whether such a project will accelerate the rate of investments and joint ventures between Singapore and Iskandar Malaysia.
The Minister for Foreign Affairs (Mr George Yong-Boon Yeo): Mr Speaker, Sir, let me first clarify that the two countries did not sign a Memorandum of Understanding (MOU). A Joint Statement was issued after the Prime Ministers of Singapore and Malaysia met at their Retreat on 24th May this year. The Joint Statement reflected their agreement on, among other things, the relocation of the Keretapi Tanah Melayu Berhad (KTMB) railway station from Tanjong Pagar to the Woodlands Train Checkpoint by 1st July 2011 pursuant to the Points of Agreement on Malayan Railway Lands in Singapore, or what we call the POA, signed in 1990, and subject to agreement on the land swap issue.
Prime Minister Lee visited Malaysia on 22nd June 2010 to discuss the land swap issue with Prime Minister Najib and conveyed Singapore's offer on the land swap. Following the same meeting, Prime Minister Lee sent a revised land swap offer to Prime Minister Najib on 28th June 2010. Prime Minister Najib accepted the offer on 17th September 2010 and Prime Minister Lee replied on 19th September 2010 confirming his agreement. The Prime Ministers met again in Singapore on 20th September 2010 as a follow-up to their earlier meetings, and have agreed on the following:
The Singapore Government shall vest four land parcels in Marina South and two land parcels in Ophir-Rochor in a joint
Column: 1321
venture company called M-S Private Limited, for joint development when KTMB vacates the Tanjong Pagar Railway Station (TPRS) and relocates the railway station to Woodlands. KTMB will vacate Tanjong Pagar by 1st July next year. M-S Pte Ltd will be 60% held by Khazanah Nasional Berhad of Malaysia and 40% held by Temasek Holdings (Pte) Ltd of Singapore. The Marina South and Ophir-Rochor land parcels are in lieu of the three parcels of land in Tanjong Pagar, Kranji and Woodlands mentioned in the POA and three additional pieces of land in Bukit Timah previously offered by Singapore.
The land swap between the Marina South and Ophir-Rochor land parcels, on the one hand, and the three POA land parcels and three Bukit Timah land parcels, on the other hand, is done on an equivalent value basis using the value of the three POA land parcels and three Bukit Timah land parcels based on their maximum development potential. Development charges therefore have to be paid on the three POA land parcels and the three Bukit Timah land parcels to realise their value based on maximum development potential for the purposes of the land swap. Malaysia agrees that development charges are payable for the three Bukit Timah land parcels but holds a different view from Singapore relating to the development charges payable on the three POA land parcels. Both Leaders have agreed to settle this issue amicably through arbitration under the auspices of the Permanent Court of Arbitration. They have further agreed to accept the arbitration award as final and binding. Both Leaders also agreed that the arbitration will proceed on its own track, and shall not affect the implementation of the POA and the other bilateral initiatives agreed in the Joint Statement of 24th May 2010, which shall continue to be implemented.
Column: 1322
The details of the relocation of the railway station and other implementation issues are being sorted out by the Joint Implementation Team co-chaired by the Secretary General of Malaysia's Ministry of Foreign Affairs and the Permanent Secretary of Singapore's Ministry of Foreign Affairs. The Joint Implementation Team shall conclude their discussion on the details of the implementation of the 24th May Joint Statement by 31st December this year, by the end of this year.
After KTMB relocates its station to Woodlands Train Checkpoint by 1st July next year, the railway station building in Tanjong Pagar will be conserved and will serve as the centrepiece for any future development on the site. It was also agreed that the old Bukit Timah railway station building at Blackmore Drive can be conserved as well. The rest of the land along the railway tracks will be incorporated into the future development plans of the surrounding areas to meet Singapore's development needs.
The two Prime Ministers also committed to the joint development of a rapid transit system (RTS) link between Singapore and Tanjung Puteri in Johor Bahru, targeted to be completed by 2018. As this will be a major infrastructure project, both sides are currently discussing the details of implementing the RTS link. This includes looking at factors such as connectivity with both the Singapore and Johor Bahru public transport networks.
In addition, to improve the existing connectivity between Malaysia and Singapore, the two governments agreed to lower toll charges for the Second Link by 30% on both sides and, in fact, the revised toll rates have been implemented with effect from 1st August this year.
On the Iskandar Malaysia (IM) iconic project, the two Prime Ministers agreed that Khazanah and Temasek will form a
Column: 1323
50-50 joint venture company to undertake the development of an iconic wellness township project, which would involve the participation of the private sector of both countries. Both sides are supportive of the "live-work-play" wellness township concept proposed by our Joint Ministerial Committee for Iskandar Malaysia. The proposed iconic project will offer holistic wellness services and facilities in a sizeable development.
Mr Speaker, Sir, as Members are aware, the IM project is an ambitious initiative that Malaysia has embarked on to catalyse further economic growth. Companies from Japan, South Korea, China, India, and the Middle East have shown interest in the IM. With the proximity of the IM, Singapore companies are also considering opportunities there. From May 2006 to May 2009, Singapore companies invested some RM 2.64 billion in Iskandar Malaysia. The joint development of the iconic project will send a strong signal of the Singapore and Malaysian governments' continuing commitment to strengthen bilateral political and economic ties, especially in Iskandar Malaysia.
Mdm Halimah Yacob (Jurong): I want to thank the Minister for his explanation. I am also glad to hear that the two iconic structures will be conserved. I have a couple of supplementary questions to ask the Minister.
I would like to ask the Minister, in light of these developments, whether he could give an assessment of the state of relations between Singapore and Malaysia. The second supplementary question is the rapid transit system link: how far has the discussion proceeded and has it been agreed whether it will be under the water or on land? And the third question I would like to ask is the issue of development charges: has this already been referred to the International Court of Justice (ICJ)? These are the three questions I would like to ask. And I would like to compliment
Column: 1324
the Prime Minister and also the Prime Minister of Malaysia for their very brave and forward-looking way in trying to iron out these issues. Now that we have reached this stage, this would pave the way for other issues to be resolved and ironed out as well.
Mr George Yong-Boon Yeo: Mr Speaker, Sir, if I may answer the second and third questions first. The RTS Link will be a major infrastructural project linking the two urban transport systems together. I think both sides are doing detailed studies and they have to meet to discuss what best would serve our mutual needs in a most cost-effective way. Whether it should be above water or below water, I think all these details have to be discussed and would require proper engineering studies and proper cost analysis.
As for the arbitration on development charges, both sides are now assembling their legal teams, and they have not yet met for this purpose, but the Joint Implementation Team will have to work all this out, and begin the process of resolving these matters.
Mdm Halimah is right that with this agreement, bilateral relations are now on a different plane. A chapter which has been kept open for 20 years has finally been closed, enabling us now to look at the future and prospects for future cooperation in a globalised world in a much more positive and constructive way. So I would say this is a milestone in the history of bilateral relations between the two countries. I would say relations now are excellent, and there should be prospects for greater future cooperation, both political and economic.
Source: Singapore Parliament Official Report (Hansard) for 18 October 2010. Republished on SGParliament.