Promoting and Supporting Use of Prefabrication Methods for Construction Projects
Parliament of Singapore · 7 July 2026
Official Report, 7 July 2026, Vol 96, Issue 32 · Open in the reader (summaries, search, filters)
Assoc Prof Terence Ho asked the Minister for National Development (a) what progress has been made over the past five years in increasing the share of construction projects using prefabrication methods in Singapore; (b) what more can be done to reduce bottlenecks to adoption, such as inadequate storage space, for prefabricated components; and (c) what is the outlook for integrated construction and prefabrication hubs (ICPHs) in Singapore.
Mr Chee Hong Tat: The share of new developments that adopted design for manufacturing and assembly (DfMA), has almost doubled from just under 40% in 2020 to 76% in 2025, with increased uptake of prefabrication methods across both public and private sector projects. The Building and Construction Authority (BCA) has been working with agencies and the industry on standardising prefabricated components to reap better economies of scale and has streamlined regulatory approvals for developers that use standardised building components across their projects of similar typologies.
To increase storage capacity, BCA has allocated temporary land plots to the industry to store prefabricated components. Integrated construction and prefabrication hubs (ICPHs) have also implemented technology solutions, such as automated multi-storey storage and retrieval systems, to enhance the efficiency of their storage spaces.
The outlook for ICPHs remains positive, supported by robust construction demand and continued adoption of DfMA. As land and manpower constraints become more acute, ICPHs will continue to play an important role in achieving higher productivity, better quality and more reliable delivery through greater standardisation, automation and end-to-end coordination.
Source: Singapore Parliament Official Report (Hansard) for 7 July 2026. Republished on SGParliament.