POTONG PASIR TOWN CENTRE (Lift Upgrading Programme)

Parliament of Singapore · 21 September 2004

Official Report, 21 September 2004, Vol 78, Issue 5 · Open in the reader (summaries, search, filters)

Column: 648

POTONG PASIR TOWN CENTRE:

(Lift Upgrading Programme): 8.

Mr Chiam See Tong asked the Minister for National Development whether, in the light of the recent

Column: 649

National Day Rally speech where the Prime Minister said that Singapore must take good care of its senior citizens, his Ministry will now allow the Potong Pasir Town Council to make lifts stop at every floor in all the blocks of flats that are currently undergoing the town council's Lift Upgrading Programme.

The Minister of State for National Development (Mr Cedric Foo Chee Keng) (for the Minister for National Development): Mr Speaker, Sir, all town councils, including the Potong Pasir Town Council, are free to carry out their own Lift Upgrading Programme which may include providing for lift access on every floor. What they cannot do is to finance such major upgrading works solely or substantially from town council funds. Let me explain.

Town councils (TCs) are largely funded by service and conservancy charges (S&CC) collected from residents as well as grants from the Government. The Government has to ensure that TCs use these funds prudently for the benefit of the majority of their residents over the long term. This is why TCs are required by the Town Councils Act to lock away 30% to 35% of their funds into a sinking fund, to ensure that they have adequate funds in the long term to do major cyclical works like repainting, re-roofing, replacing lifts and replacing water-supply systems. The remaining 65% to 70% of the funds are used for routine operating expenditure, such as cleaning, repairs and utility charges.

Lift upgrading works which will enable lifts to stop at every floor are major structural upgrading. They are very costly. Town councils' funds are neither intended nor adequate for this purpose. Therefore, under the Government's Lift Upgrading Programme, town councils fund only a small portion of the total cost and the bulk of the cost is borne by the Government.

Column: 650

Mr Chiam See Tong (Potong Pasir): Sir, I have got two supplementary questions for the Minister of State. What are the reasons for HDB in not allowing lifts to stop at every floor at Lorong 8, Toa Payoh, of the Potong Pasir Constituency? And will HDB Lift Upgrading Programme be implemented at Potong Pasir estate?

Mr Cedric Foo Chee Keng: Sir, as I said earlier, town councils are free to do major upgrading programme for the lifts, including providing for lifts to stop at every floor. However, the town councils cannot use town council's funds to substantially finance such upgrading works. If I may refer the Member to the Potong Pasir Town Council's accounts, just as an example. Potong Pasir has a balance of $8 million in its sinking fund. If he does the cyclical repairs for the 12 blocks that he is right now doing, it will cost him $4 million. So he would have $4 million left. But if he were to do upgrading in a manner which allows lifts to stop at every floor, that would cost another $12 million for this LUP, which means he will be short of $8 million. So the Potong Pasir Town Council really does not have sufficient balance in its sinking fund to do major lift upgrading works.

Sir, the Member's second question is whether or not Potong Pasir Town Council will get the Government's Lift Upgrading Programme. To-date, the Government has done about 600 blocks of LUP and there are about 3,000 eligible blocks remaining. So we have completed roughly 17%. Lift upgrading is selected based on several criteria, ie, the block configuration, the needs of the residents, the geographical spread, and also the degree of support from the residents. We need to bear in mind that it is the whole range of Government policies and programmes that bring about budget surpluses that allow us to do such improvement

Column: 651

programmes. Hence, all things being equal, residents who support and vote for the Government policies would be given higher priority in upgrading.

Mr Chiam See Tong: With due respect to the Minister of State, I have been the Chairman of the Potong Pasir Town Council for 15 years now. And I think we know what funds can be used for lift upgrading and what funds cannot be used. I can assure the Minister of State that we do have sufficient funds in the sinking fund to carry out both our Lift Upgrading Programme at Lorong 8, Toa Payoh, and also the R&R works that we are going to do at Potong Pasir estate. Of course, we have to get permission from HDB to do our lift upgrading at Lorong 8, Toa Payoh. But the HDB specifically says, "Ok, you can go ahead and do lift upgrading.", but they do not allow us to make the lifts to stop at every floor. So I want to know what is the reason. We do not spend $12 million, as the Minister has said. The lift upgrading for 29 lifts only cost us just over $2 million. I do not know where he gets his figures from.

Mr Cedric Foo Chee Keng: Sir, as I said earlier, the town councils are free to do lift upgrading, including providing for lift access to every floor. What it cannot do is to use the sinking fund for such major structural works which include lift stops at every floor. And this is quite plain. Sinking fund is provided for all sorts of cyclical works, not just lift upgrading works. It could be replacement of lifts, water systems, and so forth. So if a particular town council were to use its sinking fund purely to do major structural upgrading works, like allowing lifts to stop at every floor, then it would be an inappropriate use of the sinking fund. Just a back-of-the-envelope calculation, for a 4-room flat, the Member would know that we collect about $50 per

Column: 652

month for S&CC. So multiply that by 12, it is about $600 a year. And if one-third of $600 is set aside for sinking fund, that is $200. To do a lift upgrading programme which allows a lift to stop at every floor would cost per benefiting unit something like $4,000 at the lowest, that is, for common corridor type of flats. You take $4,000 and divide by 200, it will take you 20 years. You will have to collect 20 years of sinking fund from the residents.

Mr Chiam also has six segmented blocks and those cost a lot more, six times more or $24,000 to do lift upgrading works per benefiting unit. This means 20 x 6, or 120 years of collection of sinking fund from the residents before such works can be completed. So I think my numbers are clear. We have done our research. It will be very difficult and inappropriate for the town council to use its sinking fund for such purposes.

Mr Chiam See Tong: I think the Minister of State does not know what is happening at Lorong 8, Toa Payoh. When I said lift upgrading, actually what we are doing is replacing all the lifts there. We are ripping off all the old lifts which are about 30 years old, throwing them away and putting new computerised motors in them. And all these are paid for from the sinking fund. We have checked with HDB and we are allowed to use the sinking fund to replace the lifts, and I believe the Minister also said that earlier. When we talk of upgrading, it is a general term, but what we are actually doing is that we are replacing all the lifts there, and we do have enough funds for them. As I said, the total cost is just over $2 million. As the Minister has mentioned, we have got $8 million. I think we do have enough money. The point is that we have replaced the lifts in its present situation ---

Mr Speaker: Mr Chiam, you are making a speech. What is your question?

Column: 653

Mr Chiam See Tong: I still want to know the reasons why we are not allowed to make the lift to stop at every floor, especially the point block flats. No reasons are given. They said, we cannot. Why? We have got enough money.

Mr Cedric Foo Chee Keng: Sir, Mr Chiam maintains that the Potong Pasir Town Council has enough money. It is granted that they have enough money to do the normal cyclical works which may even include replacement of the lifts. But what he is suggesting now is to allow the lift to stop at every floor. What that means is that you will have to do major structural works, creating lift landings where there are none today, knocking off part of the walls to create the lift landing. And for the six segmented blocks that Mr Chiam has in Toa Payoh Lorong 8, of which I have visited, he will need to create extra lift shafts on top of just creating the access to every floor. And our estimation - and we have much experience in doing lift upgrading works - for a single segmented block is that the lift shafts would cost $1.8 million or so. And upgrading of the lift landing to serve every floor is about $400,000. So the total cost is $2.2 million. So that is $24,000 per unit, considering the number of benefiting units there. So as I have just calculated, if he wants to use S&CC for this purpose, then he will need to collect 120 years worth of S&CC funds from his residents just to do this major lift upgrading work, which is clearly inappropriate because the town council would still need to commit the sinking fund for all other kinds of works that it needs to do in its cyclical repairs.

Mr Speaker: Mr Chiam, is it the same question? Otherwise, we can go on to the next question.

Mr Chiam See Tong: We need some explanation.

Column: 654

Mr Speaker: You are not specific. What is your question?

Mr Chiam See Tong: It is still the same question.

Mr Speaker: If it is the same question, the same answer will be given.

Mr Chiam See Tong: The point is that now the Minister mentions the segmented blocks. What we wrote to HDB was only for the point blocks for the lifts to stop at every floor. And at the moment, our contract price with the contractors is that the lifts are put in place with the machine to stop at every floor. So when permission is given, what we need to do is just to knock a hole in the wall, make a door for the lift to stop. It is easily adjusted. So the cost would not be as great as what the Minister says. I cannot give him offhand how much the contractors will charge us for knocking down the walls at every floor. But that is the situation and we do have enough money. So the money is not the question. But we still do not know the reasons why permission is not given.

Mr Cedric Foo Chee Keng: Sir, even for point blocks, HDB's experience, after conducting over 600 blocks of LUP, shows that it costs something like $600,000. Therefore, for the benefiting units there, it would cost about $8,000 per benefiting unit. So let me repeat again. If it is $8,000, it would take 40 years to collect S&CC charges. Moreover, if the Member proceeds to do so just for the six point blocks, even if it costs $600,000 per block and multiply it by 6, that is $3.6 million. That would be almost half the $8 million that the Member would have. The Member would have to justify to the rest of the residents why half of the sinking funds is committed to benefit only six blocks out of the 61 blocks that he has at Potong Pasir.

Column: 655

Mr Speaker: Mr Chiam, I think you are looking at it from a different perspective. I doubt we can resolve this. You will be getting the same answer anyway.

Mr Chiam See Tong: I am asking a straightforward question. Permission is not given to Potong Pasir for the lifts to stop at every floor. Is it because it is an Opposition ward?

Mr Speaker: I suggest we go to the next Question. Mdm Ho Geok Choo.