Dewan Rakyat · 16 March 2023

15th Parliament, session 2, meeting 1 · 802 turns · 63,235 words · official PDF ↗ · Digital Hansard ↗

724 of 802 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Mr Speaker presided over the Sitting]

Time for Questions to MinistersQuestions

Mr SpeakerEN

Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. We begin the Ministers' Question Time by inviting Honourable Tuan Sim Tze Tzin, Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Mr Speaker. Good morning to the teachers and also the headmasters here, in this House. [Applause] I would like to represent the teachers out there and convey their voices to the minister for teachers, the minister for teachers.

Sim Tze TzinPKR · PHBayan Baru · questionEN

1. Tuan Sim Tze Tzin [Bayan Baru] asks the Minister of Education to state whether the Ministry of Education Malaysia (KPM) will conduct a technical audit of the Identity Management System (idMe) and the KPM Integrated System (MOEIS), which often experiences technical disruptions that make it difficult for tens of thousands of teachers to carry out their duties. State the development expenditure of this system and what action KPM will take against the failing vendor company?

Puan Fadhlina binti SidekPKR · PHMinister of Education · Nibong TebalEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and good morning. Thank you, my friend, Honourable Bayan Baru. For the information of the Honourable Member, the Ministry of Education Malaysia is aware that there has been a disruption in access to the Identity Management System (idMe) and the KPM Integrated System (MOEIS). KPM detected that the disruption began on 19 January 2023 due to technical issues and issues in the use of the system. The issue was resolved on 11 February 2023. The system's performance continues to be monitored to ensure it always operates well so as to minimise disruptions to access. KPM has identified the root cause of the problem across the whole system, taking into account the overall management of the system as well as competency of personnel in order to further strengthen the implementation of the system. As of 16 March 2023, Honourable Member, a total of 89 per cent of schools nationwide have completed entering data into the Integrated Assessment Management System (SPPB) under MOEIS through idMe. As for the remainder, they have the option of entering data either through this management system or offline. Although given the option, there are three states that use this Integrated Assessment Management System (SPPB) 100 per cent, namely the state of Kelantan, Sarawak and the Federal Territory of Labuan. Meanwhile, the state of Perlis achieved 99 per cent of data entry into the system.

Puan Fadhlina binti SidekPKR · PHMinister of Education · Nibong TebalEN

I record my thanks to all the teachers who were patient when this system experienced disruption, and even gave their full cooperation when KPM conducted assistance visits and prepared a hybrid system, while we strive to improve the competency of this system. For the information of the Honourable Member, online classroom assessment involves several modules developed separately. The modules are idME, MOEIS Institution Module, MOEIS Student Module and SPPB. MOEIS was developed in-house, while idMe and SPPB were outsourced to two different companies. Both systems were procured through quotation and open tender in accordance with the Government Procurement Circular, based on the ceiling price set in the tender. For the information of the Honourable Member, KPM will not compromise on any breach of the terms and conditions set for the companies implementing this system. For the information of the Honourable Member as well, KPM is ready and open to any integrity inquiry and internal technical audit should there be allegations regarding breaches of the implementation procedures of this system. That is all, thank you Mr Speaker.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, headmaster. Just now I asked the Honourable Minister to answer the development cost of this project. That is my first question. It is clear that this system has failed and this is not recent. Previously there were already many complaints from teachers out there. They should focus on educating our children, but they are forced to key in data until 4 a.m. I think this is an injustice and also a torture to our teachers. So, I hope the ministry will be firm on this matter. I hope and request that the Honourable Minister call in the National Audit Department, look into whether there has been any abuse of power or failures? Ensure that this new system is improved so that our teachers can focus on our children's learning. Thank you.

Puan Fadhlina binti SidekPKR · PHNibong TebalEN

Thank you, Honourable Member. I record my thanks for the Honourable Member's concern on this issue, and we indeed take note of these matters. Therefore, as I mentioned just now, Honourable Member, among the swift actions we have taken are providing a hybrid system and also the assistance visits we offered to these teachers to help them in the process of filling in that information. Honourable Member, I would also like to inform that we will work with the Malaysian Administrative Modernisation and Management Planning Unit (MAMPU) for the implementation of a technical audit of this system. The outcome of this audit is to improve the existing system in KPM's future system planning. We expect this audit, Honourable Member, to be carried out in the second quarter of 2023.

Puan Fadhlina binti SidekPKR · PHNibong TebalEN

As I mentioned earlier, KPM does not compromise with anyone or any slackening of terms, or any failure in the procedures set for the companies implementing this system. Thank you, Honourable Member.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Honourable Minister, development cost.

Puan Fadhlina binti SidekPKR · PHNibong TebalEN

Honourable Member, the cost of the procurement contract value for idMe is RM454,000 while SPPB is RM1.05 million.

Mr SpeakerEN

Please, Honourable Pasir Salak.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

Okay. Thank you Mr Speaker, Honourable Minister, my question is, does the Ministry of Education intend to stop this idMe? This is because what has happened is that the survey used is small, while the data to be entered is very large. So, when we do it like that, what has happened has happened, teachers want to enter data. Teachers enter

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

data in two ways. First, manually. Second, through this idMe, so two things that teachers have to do, when we want to reduce the burden on these teachers. What is the comment of the Honourable Minister? Thank you.

Mr SpeakerEN

Please, Honourable Minister.

Puan Fadhlina binti SidekPKR · PHNibong TebalEN

Thank you, Honourable Pasir Salak. I appreciate and record my thanks for this view. Yes, we take into account everything related to these teachers' workload burdens. Regarding this system, I think it is also important for me to record that we will be more careful and give sufficient time to all parties involved in the ministry to review, improve and, most importantly, especially in technical system testing activities as well as user change management activities, including the pilot implementation approach, in an effort to ensure the smooth use of all these systems. At this time, Honourable Member, we have no position to abolish or stop this system, but we will improve it because we see that this system still has good importance towards reducing the burden on teachers as well. At the same time, we are committed to improving this system. Thank you, Honourable Member.

Mr SpeakerEN

Thank you, Honourable Minister. Next I invite Dr. Hajah Halimah Ali, Honourable Kapar.

Dr. Hajah Halimah AliPAS · PNKaparEN

Bismillahi Rahmani Rahim. Thank you, Mr Speaker. Among the questions or complaints I have received since becoming Member of Parliament is about this very question.

Halimah binti AliPAS · PNKapar · questionEN

2. Dr. Hajah Halimah Ali [Kapar] asks the Minister of Health to state whether the ministry has made any decision prohibiting patients from using health clinic services closer to their homes after the redelineation of electoral constituencies.

Dr. Zaliha binti MustafaPKR · PHMinister of Health · SekijangEN

Thank you, Honourable Kapar. Thank you, Mr Speaker. Mr Speaker, the ministry is very committed to providing health services to all citizens. All health personnel at the triage or registration counter are reminded not to reject the attendance of any customer seeking treatment at health clinics, in order to fulfil the No Wrong Door Policy that has been implemented through personalised care or the family doctor concept, to ensure continuous healthcare and that it cannot be used as an excuse to reject customers who come from outside the health clinic cooperative area. For example, a patient who receives treatment at a health clinic in the Kapar Parliamentary constituency may obtain treatment at a nearby health clinic, for example in the Bukit Raja Parliamentary constituency, if that health clinic is near the patient's residence for the sake of comfort and convenience of the patient. That is all, thank you.

Mr SpeakerEN

Alright, Honourable Kapar.

Dr. Hajah Halimah AliPAS · PNKaparEN

Thank you Mr Speaker. Thank you Honourable Minister. So, indeed that is the code of ethics for health. I would like to give one setting– That is the ideal. I would like to mention the practical one, where we received this complaint. When the third Klang bridge was built by the Selangor State Government, valued at RM300 million, the Sungai Bertek Maternal and Child Clinic, which at that time was already dilapidated, had to be demolished. At that time, I was the State Assemblyman (ADUN) for Selat Klang, and I asked the government to replace it not only with a maternal and child clinic but with a more complete, comprehensive health centre.

Dr. Hajah Halimah AliPAS · PNKaparEN

When that was established and when it was complete and able to operate, I was asked by the clinic to inform the people of Selat Klang, Sungai Udang, Kampung Delek, that they did not know this existed, that it was operating, that they could come there and need not go to the Pandamaran Health Clinic. Unfortunately, what has happened now, Mr Speaker, is that after the redelineation of PRU14, their houses, the third Klang bridge separated part of what was formerly Selat Klang from the Klang Parliamentary constituency. They are separated from the health clinic and their houses, like from here to the Parliament Building. That is all, that close. So, they said they cannot accept it, they were told to...

Mr SpeakerEN

What is the question?

Dr. Hajah Halimah AliPAS · PNKaparEN

...go to the Pandamaran Health Clinic.

Mr SpeakerEN

Honourable Kapar, what is the question?

Dr. Hajah Halimah AliPAS · PNKaparEN

So, I would like to ask– When was that just now, the open door policy, right? Please tell me, this should already have been the policy. So, why has that not happened?

Mr SpeakerEN

Honourable Kapar, the question, please.

Dr. Hajah Halimah AliPAS · PNKaparEN

And perhaps is it because there are not enough staff? Not enough medicine? Not enough what?

Mr SpeakerEN

Okay, is that the question?

Dr. Hajah Halimah AliPAS · PNKaparEN

So, I request action from the Honourable Minister.

Mr SpeakerEN

Alright, thank you for the question.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Alright, thank you. Patience, patience. So, if it indeed happened...

Mr Speaker

Very specific. Please.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

If it indeed happened, Honourable Member, I request that a complaint be made and we will investigate this matter and take appropriate action, insya-Allah. Thank you.

Soalan tambahan.

[Bangun]

Mr Speaker

Silakan.

Balik Pulau, is it?

Mr SpeakerEN

Honourable Balik Pulau.

Thank you Mr Speaker, very sure. Okay, I would like to ask the Honourable Minister of Health about the dress code that has now gone viral, where if they wear certain clothing they cannot receive health services at clinics or at hospitals. So, I would like to ask what the actual dress code is, or does the Ministry of Health Malaysia (KKM) accept anyone in emergency cases, regardless of how they dress and so on? Thank you.

Mr SpeakerEN

Please, Honourable Minister.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Thank you Honourable Member. Mr Speaker, I am aware of this matter and the matters that have gone viral in recent weeks. So, I would like to say that in principle, every patient, Honourable Member, must be given priority treatment regardless of race or dress code of ethics.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

So, every medical practitioner, including medical personnel, must uphold their ethics after we– We actually have an oath, we take an oath or what is called the Hippocratic Oath, which is pledged especially by doctors and medical practitioners, including the willingness to assist patients to the best of their ability. So, I think perhaps what has happened is a communication problem, and usually if we receive a complaint, we take immediate action to ensure that the matter does not recur. Thank you.

Mr SpeakerEN

Alright, thank you, next I invite Dr. Kelvin Yii Lee Wuen, Honourable Bandar Kuching.

Kelvin Yii Lee WuenDAP · PHBandar Kuching · questionEN

3. Dr. Kelvin Yii Lee Wuen [Bandar Kuching] asks the Minister of Communications and Digital to state the ministry's intention to amend the provisions of section 233 of the Communications and Multimedia Act 1998 [Act 588] to ensure it is not misused.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications and Digital · Lembah PantaiEN

Thank you, Mr Speaker. Thank you, Honourable Member. The Ministry of Communications and Digital and the Malaysian Communications and Multimedia Commission (SKMM) are currently studying amendments to the Communications and Multimedia Act 1998, where a comprehensive approach will take into account all existing legal provisions and also ensure that any punishment is effective and free from elements of persecution. Among the proposed amendments submitted by SKMM but not yet decided and still under discussion are proposed amendments to section 233 of Act 588. The application of section 233 of Act 588, or the Communications and Multimedia Act 1998, is generally intended to address the misuse of network facilities, network services or application services, including social media platforms for the purpose of disseminating content that is obscene, indecent, false, threatening or offensive with the intent to annoy, abuse, threaten or harass other persons.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications and Digital · Lembah PantaiEN

For the information of this honourable House, Act 588 has so far never been amended. This means 25 years have passed since this law was drafted, formulated and passed. Certainly we know that 25 years ago, now and 25 years from now, the state of technology, usage and the platforms available are also very different. Therefore, when the ministry examines it as a whole, we do not intend to look only at this section 233. However, given that major changes are taking place, if previously we only used perhaps 2G, 3G, now 5G and then what? Certainly we intend to look at the objectives. Among the main objectives of the amendment is to encourage the development of the communications and multimedia industry for future needs (fit for future), to improve aspects of network security following the increase in usage and dependence of the public on digital services and several other matters. However, since we are still in the process of discussion, my hope is to obtain feedback from Members of Parliament, among NGOs, the public, and legal experts, so that we can improve to ensure there is no abuse of power or misuse of this section for political purposes. Thank you.

Mr SpeakerEN

Please, Honourable Bandar Kuching.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

Thank you Mr Speaker. Thank you, Honourable Minister, for that detailed reply. I strongly agree that the Act is already 25 years old and we need to amend it to keep pace with the times and for present use.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

So, we know that an Act that should be used for good. I know it is to prevent obscene materials and so on, and most of the complaints are about that issue. However, if it is not amended, it remains open to abuse. So, my question is, what steps can the ministry take to ensure that what is meant for good is not misused? Perhaps for now, those offensive cases have not had a single prosecution. Can discuss with the Ministry of Home Affairs.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Alright, thank you Honourable Member. There are some figures I would like to state, Mr Speaker. Actually, what is rather interesting when we examine from January 2009 until 31 January 2023, the total number of complaints received by SKMM based on the posting element is 2,804. These are the complaints received. Of that total, 1,625 or 57.9 per cent are complaints about content that is obscene. Meanwhile, those that are false information amount to 564 or 20.1 per cent, and offensive content totalling 541 or 19.2 per cent. Based only on the figures provided by SKMM, when we state it, more than 80 per cent of the complaints received are not those investigated or those imposed penalties or punishment or brought to court, for example. More than 80 per cent are not complaints of an offensive nature. Moreover, we see that the majority is obscene content. So from there we see that, generally, this Act is not misused. At least, not under the monitoring of this ministry. It is also rather interesting when we examine the complaints made from 2009 to 2023, there are indeed very interesting patterns, Mr Speaker. For example, the highest number of complaints in 2010 was complaints about transmission via SMS. In 2010, there were 243 complaints, but today, I give an example up to 2022, only two complaints have been received through the SMS format. At one time in 2009, the highest number of complaints about blogs or websites was 52 complaints, but up to 2022, only eight. So indeed we see there has been a change. What is interesting is that complaints received for WhatsApp show a consistent trend from 2015 until 2022, around 40 to 50 complaints every year. So, we see the pattern of platform usage as well, something that the ministry is taking into account. However, we will discuss with all parties including the Ministry of Home Affairs to ensure that this Act and this section in particular are not misused. Thank you.

Mr SpeakerEN

Please, Honourable Pasir Puteh.

Thank you, Mr Speaker, and thank you to the Honourable Minister for providing the explanation. I have examined the answer given, where the issue involving the amendment to the Communications and Digital Act is so that we ensure our country runs properly. I want to mention one check and balance. We see in political issues that many leaders speak without facts and are exposed. It affects elections. So my question is, does the Government of Malaysia today intend to move forward by presenting political figures to engage in open dialogue and have it broadcast live in our country between party presidents? Because we do not want, when in opposition, to say petrol prices should come down, remove the tolls. When in government, there is nothing. So, we want the statements made to be subject to a check and balance. Let these leaders speak. That is all, thank you.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Thank you, Honourable Member. He has strayed a little from the question, but I am very interested because when it is mentioned, yes,

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

if we look at whether it is the petrol issue or the toll issue, the issue of party defection, "anak pakai skirt" (the child wearing a skirt), these are all pure slander. Indeed we are open. I do believe we have platforms that can be provided, and the Government from time to time will study proposals such as those mentioned by the Honourable Member, so that the people become wiser, more aware, more caring, more literate, and better understand and are fluent in democracy. So it becomes democracy, not "demo kasi". "Demo kasi RM5, come out and vote for me." As an example, yes. However, what is important at this time, in the context of what we are discussing, the question raised by the Honourable Member for Bandar Kuching just now, it does not cover that but rather the aspect of slander. What is interesting, Mr Speaker, if I look at the figures, the total number of complaints, not prosecutions, yes, but complaints received by the Malaysian Communications and Multimedia Commission (SKMM). There are interesting trends. For example, in 2012, before the 2013 general election (PRU), the number of complaints received was 368. In 2013, after the general election, the number was 279, a decrease. In 2017, before the 2018 general election, there were 210 complaints. In 2018, after the general election, there were 169 complaints. Even in 2022, there were 161 complaints. So indeed, in that respect, the complaints made mostly appear to be before elections. However, relying on this Act and this section, in my view the process is rather slow. That is why, to refute or correct facts, the SKMM has a body, a unit called sebenarnya.my, to clarify and correct false information that is untrue. As for BERNAMA, there is mycheck.my to verify whether something conveyed is correct or not. So, I advise Members of Parliament to make use of the platforms mentioned just now, sebenarnya.my and mycheck.my, to verify information. Thank you.

Mr SpeakerEN

Alright, thank you, Honourable Minister. Honourable Member, the session for Ministers' Question Time today has now ended. I thank you. Secretary. [Ministers' Question Time session ended]

Oral QuestionsQuestions

Mr SpeakerEN

Alright, we begin the questions for oral answer today. Accordingly, I invite Mr Jimmy Puah Wee Tse from Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Mr Speaker. The Minister of Science has strong support. I hope he can answer question number one.

Jimmy Puah Wee TsePKR · PHTebrau · questionEN

1. Mr Jimmy Puah Wee Tse [Tebrau] asks the Minister of Science, Technology and Innovation to state what efforts the ministry is making to help more startup companies succeed and create 'unicorns' that we in Malaysia can be proud of.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Tebrau for that very neat pantun.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

Mr Speaker, for the information of the Honourable Member, the Ministry of Science, Technology and Innovation (MOSTI) has developed and launched the Malaysia Startup Ecosystem Roadmap (SUPER) on 18 November 2021. The development of SUPER is in line with the Government's current policies and initiatives aimed at generating high-technology innovation, equitable development for society, and building an entrepreneurial nation by 2030. SUPER outlines 16 interventions across five main ecosystem enablers, namely: (i) financing; (ii) talent; (iii) innovation; (iv) policies and regulations; and (v) market ecosystem. It involves all key stakeholders in the startup ecosystem, namely investor startups, ministries or government departments or agencies, industry players and other interested parties to support holistic ecosystem development and enhance the marketability of startups at home and abroad. The MyStartup programme is one of the initiatives under SUPER launched in 2021. Through SUPER's implementing agency, Cradle Fund, a total of 5,750 startup companies and individuals have benefited from the programmes implemented. Among the initiatives carried out are MyHackathon, MyStartup Pre-Accelerator, MyStartup Accelerator and other ecosystem development programmes. For 2023, it is expected that a total of 7,000 startup companies will benefit from the programmes under this MyStartup. The MyStartup Portal, a one-stop portal for the national startup ecosystem, has been developed in line with the SUPER 2021-2030 aspiration to serve as a database and to connect startup ecosystem players. To date, the portal has 4,300 registered users, lists almost 3,000 startup companies, 500 local and foreign investors, and 140 organisations providing services, incentives and programmes. More impressively, the portal has received almost 70 thousand visitors and has become a reference source from within and outside the country. In an effort to help local startups grow, MOSTI, through financing agencies such as Cradle Fund, Malaysian Technology Development Corporation (MTDC), Malaysian Venture Capital Management (MAVCAP), Kumpulan Modal Perdana (KMP) and Malaysian Debt Ventures (MDV), also provides financing and funding incentives for startup companies, ranging from early-stage financing to the next stages. A total of 144 startup companies were successfully assisted through this funding initiative in 2020. Mr Speaker, there is a lot more, but I have tried to summarise. For the information of the Honourable Member, MOSTI has identified startup companies that have successfully overcome challenges in the early development stage and have high potential to become unicorn-status startups, known as soonicorns. To date, there is one Malaysian company with unicorn status, namely a startup with a value exceeding USD1 billion, which is Carsome, and six companies with soonicorn status, namely startups with the potential to become unicorns, covering fields such as e-commerce, biomedicine, robotics, IoT and banking. Targeted programmes under SUPER are being drawn up to accelerate soonicorns identified to reach unicorn status and to help increase their scale and competitiveness, including promotion, branding, access to mentors with technical expertise, business networks, and connecting startup companies to regional and international investors.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

That is all, thank you.

Mr SpeakerEN

Thank you. Honourable Member for Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Mr Speaker. I would like to take this opportunity to congratulate and commend the company Carsome for becoming the first unicorn in Malaysia. Hopefully there will be many more soonicorns and unicorns. My supplementary question. There are two parts. First, what is the total amount of grants offered by the agencies for 2023 that can support the establishment of startup companies? Second, could the Minister explain what role MAVCAP can play in the development of the startup ecosystem in Malaysia? That is all, thank you.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you, Mr Speaker, thank you to the Honourable Member for Tebrau. The total amount of grants for startups offered by Cradle in 2023 is RM14 million. Cradle offers two types of grants, namely CIP Spark and CIP Sprint. Both these grants are conditionally allocated under the Twelfth Malaysia Plan with the mission of supporting the holistic development and commercialisation of startup companies through various value-added services such as development, business capital, acceptance and market access. Mr Speaker, as for the second part concerning MAVCAP. MAVCAP is a fund of funds. MAVCAP also provides equity financing through mechanisms to startup companies from the initial stage to the growth stage in the fields of ICT technology, green technology and emerging technologies such as deeptech, fintech and AI. From 2016 until now, investments through MAVCAP's venture capital funds have been made into 265 startup companies with a total amount of RM947 million. Thank you.

Mr SpeakerEN

The Honourable Member for Padang Besar.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Thank you, Mr Speaker. My question is, do the Government and the ministry intend to focus on critical industries such as medical, biomedical and pharmaceutical industries to be assembled or manufactured domestically in Malaysia? Considering the previous issue was COVID-19, we had to depend on outside sources. Some industries were forced to supply only to developed countries. That is all. Thank you.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you, Honourable Member for Padang Besar. Indeed biotechnology is one of the fields to which MOSTI gives full attention. For the information of this august House, recently, through the National Institutes of Biotechnology Malaysia (NIBM), we have signed an MoU with a local company, namely MVP Healthcare, and also Pfizer. This is to develop the country's capacity to develop human vaccine capacity. That is one of the efforts we are undertaking. Apart from NIBM, we also have Bioeconomy Corp, which helps our biotechnology startups to commercialise the products they produce. That is all, thank you.

Mr SpeakerEN

Alright, next I invite Mr Ahmad Tarmizi bin Sulaiman, Sik.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker. Some of us already have two wives. My question is number two.

[Dewan ketawa]

Ahmad Tarmizi bin SulaimanPAS · PNSik · questionEN

2. Mr Ahmad Tarmizi bin Sulaiman [Sik] asks the Minister of Defence to state the operability of Royal Malaysian Air Force (TUDM) radars along the South China Sea for the purpose of maritime surveillance.

Mr SpeakerEN

A defence question, yes. Please, Honourable Minister. Please, Honourable Minister. Please, Honourable Minister. The Minister hears— the Minister is stunned.

[Dewan ketawa]

Dato’ Seri Utama Mohamad bin Haji HasanUMNO · BNMinister of Defence · Rembau

Overexcited...

[Dewan ketawa]

This is one wife.

Dato’ Seri Utama Mohamad bin Haji HasanUMNO · BNMinister of Defence · RembauEN

Even one is giving me a headache, Mr Speaker.

[Dewan ketawa]

Dato’ Seri Utama Mohamad bin Haji HasanUMNO · BNMinister of Defence · RembauEN

Don't go looking for trouble. Mr Speaker, regarding the control of the air space in the South China Sea area. Mr Speaker, the short answer is simple. It is under very tight control. There are no gaps that we need to make into an issue.

Dato’ Seri Utama Mohamad bin Haji HasanUMNO · BNMinister of Defence · RembauEN

However, previously the Air Force had two large radars. One on the hill or at Mount Ngili in Sarawak, in the Kota Samarahan area. The other one was in Labuan, which had a capacity of 250 kilometres horizontally, Mr Speaker. Upwards, it could detect up to 60,000 feet because in the air there are not many obstacles. However, Mount Ngili still uses its capacity beyond or its ability, full-mission capability. Full mission means it operates fully. But we have decommissioned, or we have stopped using the other radar in Labuan because its age is already far too old and its full mission-capable (FMC) status can no longer reach the required level. So we decommissioned it. TUDM or the Ministry of Defence is in the process of replacing it. Previously the system was Italian–Alenia. Now we are calling on the PC77 system from America, which we will commission at the end of this year, God willing. Do not worry, because for the areas in Sabah and Sarawak, control and surveillance of our air space remains safe and is still being carried out very transparently, Mr Speaker. After the MH370 incident, we have learned, yes, we have learned. Even the United States learned from the 9/11 incident, Mr Speaker, because of the lack of communication between two entities, namely the air force or the Ministry of Defence and the Civil Aviation Authority of their respective countries. We were also like that, MH370 did not communicate, but after MH370, Mr Speaker, we have integrated two systems, each of which uses the information obtained by its own radar. So, whatever passes through our air, we will be able to detect it, and both these systems will detect and communicate immediately to let us know whether the military thinks the route is a normal commercial route and does not care, but now each takes note and will communicate. So, Mr Speaker, although we only have one at Mount Ngili in Sarawak, we also have three other places called civil radars that monitor these areas, especially in Kudat, Tawau and also Bintulu. So, this is clear, and all this information will go to our Air Operations Defence Headquarters (MPOU) and also to Subang, where the Civil Aviation Authority of Malaysia will receive that information. So Mr Speaker, although we may have heard that the Labuan radar has been decommissioned and is no longer in use, God willing we have already ordered its replacement with a new radar system that will

Dato’ Seri Utama Mohamad bin Haji HasanUMNO · BNMinister of Defence · RembauEN

be able to operate at 100 per cent by the end of the year. Nevertheless, our air space control is still carried out thoroughly because of the cooperation between two parties, namely the Civil Aviation Authority of Malaysia (CAAM) together with the Air Force. Thank you.

Thank you, Honourable Minister. A very long answer to understand our defence needs. My supplementary question concerns a report by Defence Security Asia on 15 January last. There was a vessel referred to as "The Monster", or a giant ship, that moves in and out of our Exclusive Economic Zone in the South China Sea. Likewise, there have been intrusions near Beting Patinggi Ali in Sarawak and so on. So there are still maritime areas of ours where intrusions occur. So, my question is about a procurement that the armed forces, or our air force, have long been waiting for, namely the medium-altitude, long-endurance remotely piloted aircraft (drone), for which there is still no final decision on the procurement of this asset. So, does the ministry intend to expedite this asset, including if it is in the Federal Government Estimates this year, where we see there is RM209 million for equipment assets that will be purchased? Is this drone also included? Thank you.

Mr SpeakerEN

Please, Honourable Minister.

Thank you, Mr Speaker. Regarding the question from the Honourable Member for Sik about "The Monster", or the nickname that has already been used for a foreign military asset. It is not a military vessel. This "Monster" is not a military vessel but more of a coast guard vessel, because– a coast guard or a navy. If it is a navy, the threat is a little different, but if it is a coast guard, it only patrols but it stays there 24/7 – 365 days. So we too will place our assets there to ensure that our recognition of our Exclusive Economic Zone (EEZ) rights is not undermined, because this is an area within our exclusive economic zone of 250 kilometres. We place our assets so that we can also say, "you are here", and day after day, morning, afternoon, night, that we send them the message, "you are in our territory, you are in our territory", to ensure that this will be used as evidence and also for when international disputes arise, which we will bring, or have already brought, to the international level, even to international negotiations. But this is the problem, Mr Speaker. That area is an overlapping area. They overlap, but this area is indeed within the United Nations Convention on the Law of the Sea (UNCLOS). We say our exclusive economic zone is 250 kilometres. This is our area, but there are also people who say it is their area. So this is an area where we must be careful, because whatever action is taken later, we do not want to trigger any dispute, but we want it to be resolved in the best possible way. However, our assets are there. That is why in our recent budget, the Most Honourable Minister of Finance has approved the application by the Ministry of Defence (MINDEF) for us to obtain assets for the Royal Malaysian Navy, because this will add to and strengthen the strength of our Navy. Our Navy's assets, which are now mostly in the South China Sea, which is a red spot or hotspot where there are many overlapping claims made by countries, are no longer enough. We feel the need for these assets and, thank God, they have been approved. I ask this esteemed House, my friends all, to approve our application for us to add to and strengthen our assets. Regarding the drone asked about by the friend from Sik just now. We have already approved it, we are buying it, we have carried out an international tender and have already examined it, and we will buy what is called a UAS, Mr Speaker, namely an unmanned aerial system drone.

This is big. This drone is not a toy drone for taking photos. It is as big as a fighter jet, big, and three, yes, which we have evaluated. It has been evaluated by our user and is indeed suitable, and it is a medium-altitude, long-endurance, or MALE UAS, which can fly for more than 48 hours, big, yes. Flight capacity of 48 hours. Then it needs refuelling again. So it will always be in the air. We will buy three, God willing, if approved. We have already carried out an international tender, Mr Speaker, and we have identified the type of MALE drone that we want to buy for the suitability of our country, God willing.

This will truly help us as our eyes. Our eyes are no longer blind, and its capacity is far-reaching and will survey hundreds of kilometres nautical, Mr Speaker, so that we ensure it serves as our first line of defence, identifying what is happening and what is being done within our area and also outside our area, Mr Speaker. If, any incursion, with respect, we will quickly move into our defence headquarters, our operations room, for identification and also for further instructions from the highest officer of our armed forces. God willing.

Mr SpeakerEN

Alright, thank you. The Honourable Member for Pasir Gudang, please.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Mr Speaker, my supplementary question to the Honourable Minister. First, regarding the Royal Malaysian Air Force (TUDM) radar in the Pasir Gudang Parliamentary constituency, located at Bukit Luncu. As of four or five years ago, I was informed that I had once visited that area, and at that time this radar, made in Italy, was still in good working condition. However, I want to know the current situation, because, as we know, our neighbouring countries' aircraft are very sophisticated. If it is only radars of this kind, they cannot detect them, and this covers the area from southern Peninsula to the South China Sea. Second, with respect, Mr Speaker, it so happens that the Honourable Minister is here. My question is, what criteria did TUDM use to buy not a few, to buy 18 units of FA-50 from Korea, Light Combat Aircraft. Thank you, Mr Speaker.

Mr Speaker

Terima kasih.

Thank you, Mr Speaker, thank you to the friend from Pasir Gudang. There are two questions, right? First, the radar in Pasir Gudang, and second, regarding the justification and also the criteria used for us to evaluate and decide to buy the light combat aircraft (LCA) FA-50 Block 20 from Korea Aerospace Industries (KAI). Mr Speaker, the first question concerns that radar. That radar is made in Italy, by Lania, it is aged, but it still has Full Mission Capability (FMC), we still have it. It is no longer partial, but it is still in the full category, it can operate, but gradually we will replace it, like at Labuan. It is still operating, but its capacity is not up to 90 per cent. So, we will gradually replace it with– we do not use it anymore now. We are shifting like at Labuan, Mr Speaker, we have chosen the TP-77 from the USA, whose power is better and suitable for the current time, Mr Speaker. So, this is being done, but in the meantime, our airspace is still operating and can still be managed very well for the present. Only it is not up to 90 per cent. However, in the Peninsula area there are many more of our radars, including commercial ones, as well as the Civil Aviation Authority of Malaysia's radar, which is why I said earlier that we already share them. We have already shared information.

There is no longer any object flying in the air that we cannot detect. That is the assurance we can give, Mr Speaker, that we are able to identify and we will share this information, any movement moving in the air within our national airspace, so that is done. Second, regarding our consideration, the purchase of the LCA FA-50 Block 20 from Korea. Mr Speaker, this was an international tender. An open international tender, and our evaluators from TUDM, who are our user. Their consideration, because we did not get involved in the evaluation consideration, since its evaluation was managed at the level of the Evaluation Committee. Like layers, at least three layers of evaluation were carried out by the user to see for themselves. The advantage of the LCA FA-50 Block 20, Mr Speaker, is that it has already been used by our neighbouring countries Thailand, Indonesia and the Philippines. Its service record is very good and it uses an engine from Lockheed Martin of America. So, given the service record of the LCA FA-50, theirs is not Block 20 but it has Block 16, Block 18 and now Block 19, and they are good. There has not been a single incident after years of use, so that its record could not tarnish this record. So, on that basis, the Royal Malaysian Air Force, the layered Evaluation Committee decided to adopt this and later, because it is trusted and can be managed well. So Mr Speaker, that is the justification of the user, or the justification of the Royal Malaysian Air Force for us to choose to buy 18 units, one squadron of TUDM for us to use here. That is the first batch, but now, Mr Speaker, what we are buying is the Block 20, the latest, which has the capability to carry air-to-ground missiles, which previously had very little capability. This nearly has the same competent capability as the MRCA, the multirole combat aircraft, which is larger and more expensive. It serves as an interceptor because it is light, it is faster, and it can be used for our country's current needs while we re-evaluate whether we need to have an MRCA. Our MRCA now is the Hornet, Mr Speaker, and also the Sukhoi, still in use, but they need what we call an extension of life programme. They can still be used, and there was also a question from the Honourable Member for Tanah Merah the other day regarding our desire, our intention to obtain 18 F/A-18F Super Hornets or Hornet Version C and D. Our D, theirs is C, but their C has been upgraded. Its life has been extended. Its use can continue for another 15 to 20 years, Mr Speaker. So, the answer to the friend from Pasir Gudang, our consideration to acquire this FA-50 asset is based on service record. We do not want to buy something whose service record does not yet exist or which is a prototype. We do not want our soldiers to become test laboratories. We use assets that have proven capability and a good service record. Thank you. [Applause]

Mr SpeakerEN

I gave the Honourable Minister of Defence the time just now because this is an important issue. An issue that is often raised and does not get a clear answer. Thank God, today we have received a clear answer. I will proceed with question number three.

Mr Speaker, may I ask a question?

Mr SpeakerEN

No, we cannot, that's enough. Too long. The Honourable Member, Puan Isnaraissah Munirah binti Majilis, Honourable Member, Kota Belud.

Mr Speaker

Pronunciation betul?

Isnaraissah Munirah.

Mr SpeakerEN

Isnaraissah, I thought it was someone else, you know.

Munirah MajilisWARISANKota Belud · questionEN

3. Puan Isnaraissah Munirah Majilis [Kota Belud] asks the Minister of Communications and Digital to state the frequency of monitoring the quality of voice call and Internet service access in Sabah, as well as the improvements made, and to state the total amount of compounds imposed on telco companies that have failed to provide the quality standards stipulated over the past five years.

Puan Teo Nie ChingDAP · PHDeputy Minister of Communications and Digital · KulaiEN

Thank you, Mr Speaker. Thank you to my friend from Kota Belud. For the information of this esteemed House, the Ministry of Communications and Digital (KKD), through the Malaysian Communications and Multimedia Commission (SKMM), constantly conducts quality of service tests and audits from time to time to ensure that the services provided by service providers meet the standards stipulated under the Communications and Multimedia Act 1998 (Act 588) and the mandatory standards for quality of service. Apart from efforts to improve broadband networks through the provision of communications infrastructure, SKMM also carries out on-the-ground quality measurements based on complaints and periodic audit planning for the whole country.

Puan Teo Nie ChingDAP · PHDeputy Minister of Communications and Digital · KulaiEN

In 2022, a total of 29 commission directions were issued to service providers that failed to meet the mandatory standards, involving 29 different locations in Sabah. Through these commission directions, service providers are obliged to improve the quality of service by optimising or upgrading existing towers so that the quality of user experience is at a good level. Non-compliance with commission directions may be subject to civil penalties of up to RM200,000. SKMM has carried out re-measurements to check the compliance of service providers with all 29 commission directions issued in Sabah. As of 9 November 2022, the results of the check found that the mandatory standards had been achieved at all 29 locations. Quality of service audit activities will also be continued for 2023 with a target of 4,000 locations across the country, including 225 locations for Sabah, to ensure the mandatory standards continue to be complied with and thereby improve broadband network problems, especially in rural areas. Over the period from 2018 to 2022, SKMM issued a total of 170 compounds valued at RM7,470,000 to licence holders for offences of failing to comply with quality of service standards stipulated throughout Malaysia. I have a breakdown for the various offences, but I will provide that in the written reply, and out of the total compounds issued, one compound valued at RM50,000 was issued to Celcom Axiata Berhad for failing to achieve quality of service standards in Sabah. In this regard, feedback from the public for areas with service problems is greatly welcomed to enable further action to be taken. Any complaints relating to quality of service and communications networks may be channelled directly to the SKMM complaints portal via the web link https://aduan.skmm.gov.my and we also welcome all feedback from Honourable Members. That is all, thank you.

Mr SpeakerEN

The Honourable Member for Kota Belud, please.

Although– Honourable Deputy Minister, although the government spends billions of ringgit every year to upgrade or build infrastructure to extend internet and phone call coverage, but for us in Sabah, sometimes 4G is just 4G, we don't feel anything, lah.

So, my question is whether the government intends to require telco companies to provide discounts or rebates to users. That rate may also be based on– determined by the complaints or the duration of time experienced by the user. What are the minimum standards that have been set for these telco and internet companies that they must comply with under the MCMC, so that when we reload RM30, we really feel that RM30, thank you.

Mr SpeakerEN

Alright, the Honourable Minister.

Puan Teo Nie ChingDAP · PHKulaiEN

Thank you to my friend from Kota Belud. For the first question, whether we have made rebates from telco companies mandatory, the answer is no. However, as consumers (customers), they may request that rebate from the telco companies, and we believe that so far, the competition between these telco companies is very fierce, very high. So, telco companies will do their best to keep their customers. So, that is up to the telco companies, but if there is a need, SKMM will consider including this rebate request in the General Customer Code (GCC). For the second question, what kind of minimum standards have been set by SKMM. For the information of this esteemed House, SKMM has issued mandatory quality of service standards for four types of service, namely: (i) wired broadband services; (ii) wireless broadband services; (iii) public cellular services; and (iv) customer services. The procedure and process for setting these mandatory standards is that we require a public inquiry process so that we can obtain feedback from all stakeholders (pemegang taruh), and these standards will be reviewed every three years. The last time these standards were reviewed was in August 2021. So, we welcome feedback from all parties on how these mandatory standards can be improved, thank you.

Mr SpeakerEN

Alright, I invite the Honourable Member for Alor Setar.

Thank you, Mr Speaker. I congratulate the ministry for taking action to impose as many as 170 compounds as mentioned earlier. My supplementary question, Mr Speaker, is, what is the root cause of these telco companies' failure to comply with the standards set, what are the common causes? Second, we also receive complaints when telco users, for example, their coverage is limited because there are already two transmitters but there is a grey area in the middle. So, the transmitter on the left cannot reach, the one on the right cannot reach, it is somewhat neglected. So, what action will the ministry take? Thank you.

Puan Teo Nie ChingDAP · PHKulaiEN

Thank you, Honourable Member for Alor Setar, for those two questions. What are the causes of their failure to comply with the mandatory standards that have been set? There are many factors, perhaps because demand in that area has increased. So, the existing infrastructure is insufficient, and we will ask telco companies to improve by upgrading the existing infrastructure or erecting new towers. Sometimes, we have already sent commission directions to them, but within the stipulated time period, they are unable to comply with the commission directions, and sometimes they also face problems with local authorities (PBT).

Puan Teo Nie ChingDAP · PHKulaiEN

This is because, to erect— let me give an example. If a new tower needs to be built, the telco company must obtain approval from the local authority (PBT) if it wants to erect a tower in a residential area, but it cannot get approval from the JMB or the management committee. That would make it difficult for telco companies to ensure that the best services can be offered to everyone. So, these are the on-the-ground challenges faced by everyone. Next, regarding the second situation mentioned by the Honourable Alor Setar earlier, that there may be neglected areas between two towers, this is one of the places where we need feedback from the public so that we know there are grey areas where coverage is inadequate. The SKMM can issue a directive to telco companies to upgrade the infrastructure in that area. Therefore, we always welcome feedback from all members of the public and also from Honourable Members, so that the SKMM can also monitor the level of service offered by all telco companies. That is all, thank you.

Mr SpeakerEN

Thank you. Next, I invite Dato' Wira Dr. Ku Abd Rahman bin Ku Ismail, Honourable Kubang Pasu.

That was long. Just back in the House, Mr Speaker, we missed you, Mr Speaker.

Mr SpeakerEN

Which question number?

Question number four. I want to make a small correction, this is a typo error. The word 'environment' is not 'environment', it should actually be 'environmental'. 'Government' is not 'government' but 'governance', that is a typo error. That is all.

Mr SpeakerEN

Alright, thank you. Please proceed.

Ku Abd Rahman bin Ku IsmailBERSATU · PNKubang Pasu · questionEN

4. Dato' Wira Dr. Ku Abd Rahman bin Ku Ismail [Kubang Pasu] asks the Minister of Economy to state the Government's initiatives to strengthen environmental, social and governance (ESG) in Malaysia.

Dato Hajjah Hanifah Hajar TaibPBB · GPSDeputy Minister of Economy · MukahEN

Assalamualaikum warahmatullahi wabarakatuh and greetings, Mr Speaker. Environmental, social and governance (ESG) is a principle introduced by the United Nations Principles for Responsible Investment (PRI) in 2006, which emphasises the development of a sustainable investment system to have a direct impact across the entire business value chain across all sectors and industries.

Dato Hajjah Hanifah Hajar TaibPBB · GPSDeputy Minister of Economy · MukahEN

Among the ESG practices that a business can report are the implementation of recycling programmes, the creation of open employment opportunities, the provision of comfortable and safe workplaces, the establishment of good and equitable governance policies in companies, and reporting on carbon or greenhouse gas emissions. The adoption of ESG principles in this way increases added value to attract more investment. Among the initiatives implemented to increase the adoption of ESG are, firstly, the introduction of the low carbon transition facility (LCTF) with incentives, which is led by Bank Negara Malaysia to encourage and support small and medium enterprises (PKS) in applying sustainability practices to strengthen business resilience. A total of RM420 million, or 21 per cent of the overall RM2 billion LCTF fund, has been utilised by PKS to date. Efforts are being intensified to increase the adoption of ESG among PKS, given that the level of

Dato Hajjah Hanifah Hajar TaibPBB · GPSDeputy Minister of Economy · MukahEN

awareness among PKS is at 42 per cent based on a public survey report by SME Corporation Malaysia in 2023. Secondly, issuing sukuk and bond grant schemes under the Sustainable and Responsible Investment (SRI) Sukuk Framework by the Securities Commission Malaysia to encourage more companies to finance green, social and sustainable projects. At present, all public listed companies (PLCs) on Bursa Malaysia are encouraged to report business practices that comply with ESG principles. This business reporting is expected to be enforced by Bursa Malaysia on all PLCs in 2024. Thirdly, implementing the Government Green Procurement (GGP) Policy, which is led by the Ministry of Finance to encourage and cultivate the purchase of green products and services in the public sector. Efforts to strengthen the implementation and increase the adoption of ESG in Malaysia were initiated in the Twelfth Malaysia Plan and will continue to be emphasised under the Mid-Term Review (KSP) of the Twelfth Malaysia Plan (RMKe-12). The Ministry of Economy, as the focal point for the implementation of ESG in Malaysia, will continue to intensify efforts to promote the adoption of ESG among industries and the public sector. In addition, an integrated ESG ecosystem covering, among other things, clear policies and guidelines, adequate financing and initiatives, as well as continuous awareness and understanding, also needs to be developed. Industry players in all economic sectors are encouraged to adopt ESG to ensure more sustainable economic activities. That is all, thank you.

Mr SpeakerEN

Honourable Kubang Pasu.

My supplementary question. Thank you, Honourable Deputy Minister. Does the Government have a policy regarding ESG, namely environmental, social and governance, that covers all three elements, namely governance, social and the environment? What are the Government's plans and strategies to achieve ESG compliance? With permission. This is because ESG is a pillar in measuring the sustainability of an organisation and a nation. Where is Malaysia in the implementation and compliance of ESG compared to other countries in the world at this time? Also, has the Government set any target for when Malaysia will be able to achieve full ESG compliance? Thank you.

Mr SpeakerEN

Please, Honourable Deputy Minister.

Thank you, Honourable Member. I do not have the information and data on that matter with me at the moment. However, I will provide a written answer. Thank you.

Soalan tambahan.

Mr SpeakerEN

Alright, thank you.

Supplementary question, Balik Pulau.

Tuan Lee Chean ChungPKR · PHPetaling Jaya

[Bangun]

Mr SpeakerEN

Alright, I will move on to the next question...

Tuan Lee Chean ChungPKR · PHPetaling Jaya

Soalan tambahan...

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala Selangor

Tidak ada...

Mr SpeakerEN

Oh, sorry. Yes, please, please.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala Selangor

[Ketawa]

Thank you, Mr Speaker.

Mr SpeakerEN

Honourable Balik Pulau, yes, please go ahead.

I would like to ask about ESG because we know it emerged in 1996 when the Nike sweatshops became hot news regarding violations of human rights and so on. However, here in Malaysia it may still be new, and I would like to ask whether there are any specific acts, regulations or policies to tighten ESG practice and performance, and how we are to enforce this ESG? Compliance, compliance of ESG for companies that fail to comply; are penalties imposed and so on? Also, what incentives do we give to companies, to those that succeed in the best reporting on ESG practices in their respective companies? Thank you.

Mr SpeakerEN

Please, Honourable Deputy Minister.

Thank you, Honourable Member. At the moment there is no act, and the standard used– We look at it from the perspective of global standards. Insya-Allah, it is important for us to continuously interact with stakeholders and the industry to further understand, so that the acts that need to be implemented will be carried out fairly and equitably. Thank you.

Mr SpeakerEN

Alright, next I invite Tuan Syahredzan bin Johan, Honourable Bangi. Please.

Thank you, Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh, greetings. Access to lawyers is a right for all. My question is number five.

Syahredzan bin JohanDAP · PHBangi · questionEN

5. Tuan Syahredzan bin Johan [Bangi] asks the Prime Minister to state whether the scope of legal aid through the National Legal Aid Foundation (YBGK) will be expanded to civil claim cases in court as well as Industrial Court cases, so that more Malaysians can gain access to lawyers.

Thank you, Mr Speaker. And to my colleague, the Honourable Bangi. Mr Speaker, the National Legal Aid Foundation (YBGK) was established with the aim of providing legal aid services for criminal cases only. From 2020 to 2022, YBGK provided criminal legal aid services to a total of 657,057 persons. The Legal Aid Department (JBG) is also a government department established to provide legal aid services for civil and syariah cases. JBG also has limited criminal jurisdiction, namely representing accused persons who wish to plead guilty to reduce their sentence, representing children in court for child proceedings under the Child Act 2001, and representing accused persons in criminal proceedings under the Minor Offences Act 1955. For the years 2020 to 2022, a total of 27,396 civil, syariah and criminal cases were handled by JBG. JBG provides legal aid services to deserving members of society, particularly those in the low-income group, namely individuals whose financial resources are below a ceiling set by law. JBG implements services provided under the legal aid law, the Legal Aid Act 1971 [Act 26], as follows: (i) legal advisory services; (ii) representation services in civil and syariah courts; (iii) mediation services; and

(iv) legal companionship services. The jurisdiction of JBG for civil, criminal and syariah cases is stated in the Second and Third Schedules of Act 26. However, JBG may still handle civil and syariah cases outside the Third Schedule if it obtains approval from the Honourable Minister under section 12(3) of the Act. JBG is also taking action to further expand JBG's civil and syariah jurisdiction by adding more types of cases to be included as jurisdiction in the Third Schedule of Act 26. Cases in the Industrial Court, Mr Speaker, are not included in JBG's jurisdiction under the Legal Aid Act 1971. However, JBG may handle appeals and judicial review cases against Industrial Court decisions in the High Court, with the approval of the Honourable Minister. Industrial Court cases, for the information of Mr Speaker, are not included because they are not defined as a court under the said Act. For further information, to finance the operational expenses of YBGK and to pay for services provided by panel lawyers, the Government has allocated a total of RM24.6 million for the years 2020 to 2022. In the same period, JBG was allocated RM94.9 million by the Government to implement its legal aid services across all JBG branches.

In these three years alone, the Government has spent a total of RM119.5 million to provide legal aid services to Malaysians. In addition, from 2018 to 2022, a total of 2,071 court-appointed lawyers were appointed for proceedings in the Federal Court, Court of Appeal and High Court of Malaya and High Court of Sabah and Sarawak, involving a cost of RM8 million to the Government of Malaysia. Currently, to further strengthen access to legal aid in Malaysia, the Legal Affairs Division of the Prime Minister's Department (BHEUU) is also actively conducting a policy study on the proposal to establish a public defender office to institutionalise criminal legal aid services so that these services can be provided in a more structured, sustainable and holistic manner, while giving everyone, especially those who are less able, the opportunity to access justice. That is all, thank you Mr Speaker.

Mr SpeakerEN

I invite the Honourable Bangi.

Thank you, Honourable Deputy Minister, for that answer. We know that access to justice is a fundamental human right, and the Honourable Deputy Minister has also stated about two entities that provide legal aid, namely YBGK and JBG. The Bar Council (Majlis Peguam) takes the position that there should in fact be only one body providing this legal aid service to ensure effectiveness. So my question is, does the ministry intend to merge YBGK and JBG into one entity to ensure that legal aid can be provided more effectively? Thank you.

Mr SpeakerEN

Please, Honourable Minister.

Thank you, Honourable Bangi, for that question. Given that there are two entities handling legal aid cases, YBGK and JBG as mentioned just now, there are certainly plans, efforts or studies to merge both to achieve a single uniform body to handle legal aid cases for all. In this effort, the Government has already carried out a study, as I said earlier, through BHEUU, to examine whether the public defender office is a reasonable alternative in this effort.

For the information of the Honourable Member, in the speech of the Right Honourable Prime Minister during the last budget, he also stated that the Legal Aid Department and YBGK are important functions for legal aid efforts, and to move forward, the Government will study the option of enacting a specific act to offer free legal aid for criminal cases so that the underprivileged also gain access to justice. That is one of the achievements of the public defender office. That is all, thank you.

Mr SpeakerEN

Please, Honourable Tumpat.

Thank you, Mr Speaker, thank you Honourable Deputy Minister. I have two questions. First, is the Government prepared to make plans to hold strategic cooperation with other ministries? For example, recently the former Minister of Energy and Natural Resources introduced the Estate Case Backlog Resolution Clinic, which has successfully resolved almost 29,423 backlogged cases relating to estate matters. So, is the ministry prepared to cooperate with other ministries? Second, there are more than 12,000 registered lawyers in our country. So, will the Government establish YBGK in all Parliaments, specifically to handle cases involving emergencies, namely when disasters or major floods occur, which can be resolved by way of free legal aid services at the respective locations? If this can be introduced, will the Government finance it? Thank you.

Mr SpeakerEN

Please, Honourable Minister.

Thank you, Mr Speaker. As for the question, firstly regarding the efforts of the Human Resources Ministry, with permission. Of course, that is something that increases access to legal aid, and this is the main objective of this effort, namely under YBGK and also JBG. So, given that this objective is the same as our objective, we are certainly open to cooperating with that ministry and also with other ministries to achieve a reasonable the way forward. Secondly, regarding the second question, namely that there are more than 12,000 registered lawyers and whether all Parliamentary constituencies will be provided with this legal aid service. This is something that has not yet been brought to our attention, but it may be studied further because it is an idea that may be aligned with our big objective, namely to provide legal aid to everyone. Thank you, Mr Speaker.

Mr SpeakerEN

Alright, next I invite the Honourable Datuk Dr. Nik Muhammad Zawawi bin Salleh, Pasir Puteh.

Mr Speaker, I am very nervous about proposing. Honourable Minister, please answer question six. [Laughter]

Mr SpeakerEN

Please, Honourable Minister.

Nik Muhammad Zawawi bin SallehPAS · PNPasir Puteh · questionEN

6. Datuk Dr. Nik Muhammad Zawawi bin Salleh [Pasir Puteh] asks the Minister of Entrepreneur and Cooperative Development to state the strategy of the Malaysia Madani Government in ensuring the continuation of efforts to digitalise Malaysian PKS directly and more efficiently than at present, which is seen to focus more on grants involving multinational industry players such as Maxis, Digi and others, by providing a platform and automation training for PKS.

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

Thank you, Mr Speaker. For the information of the Honourable Pasir Puteh and this august House, the question may touch on the role of agencies under

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

another ministry. However, I am pleased to share the strategies and initiatives implemented by my ministry and the agencies under my ministry. My ministry launched the KUSKOP Strategic Plan 2023 on 17 January 2023, which aims to provide a conducive ecosystem to support and drive the recovery, growth and stability of the nation's entrepreneurship sector, and to enhance the resilience and competitiveness of entrepreneurs post-pandemic. Through this strategic plan, the ministry has focused on efforts to digitalise micro, small and medium enterprises including cooperatives through the following strategies: (i) accelerating the level of technology adoption to improve business efficiency and productivity; and (ii) encouraging the use of digital platforms to expand domestic and international markets. A total of five specific programmes will be implemented under this strategy, with a target participation of 4,320 PMKS and cooperatives this year, namely as follows: (i) the Pybli portal implemented by Pernas, which aims to help entrepreneurs expand their businesses through digital platforms, involving a target of 100 participants; (ii) the MyMall digital entrepreneurship platform implemented by the ministry with a target of 200 participants. This initiative aims to create a one-stop information centre for entrepreneurs and prospective entrepreneurs to obtain information on financing, capacity-building activities or training, and marketing and advertising; (iii) the cooperative technology transformation and digitalisation programme implemented by the ministry with a target of 60 participants from cooperatives. This programme aims to provide exposure to cooperative transformation towards the use of technology and digitalisation in governance and activities; and (iv) the TEKUN Nasional Online Financing Scheme by TEKUN Nasional with a target of 3,000 participants. This programme aims to provide financing capital in an easy and fast manner, specifically for entrepreneurs who conduct business online; and

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

(v) the Empowering Cooperative Digitalisation programme (Memperkasa Digitalisasi Koperasi) by the Malaysian Cooperative Institute, targeting 1,000 participants, which aims to encourage cooperatives to use digital marketing. Thank you.

Thank you, Mr Speaker. Thank you, the Honourable Deputy Minister. As mentioned earlier, the Ministry of Entrepreneur and Cooperative Development has a very close relationship with the Ministry of Communications and Digital. My question is, what steps have been taken to promote the digitalisation of products made in rural areas that do not have internet coverage? Second, what actions have been and will be taken by the ministry to establish a single sales network between urban and rural areas? If we look, for example, in the Federal Territory, this fibre optic network coverage is 62.8 per cent; in Kelantan, it is 16.8 per cent. What steps or strategies will be

taken to balance the two areas between urban and rural areas? Thank you. [Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding

Datuk Ewon BenedickUPKO · PHPenampangEN

Thank you, Honourable Member. For the Honourable Member's information, we have a forum (platform) called the National Digital Economy and Fourth Industrial Revolution (4IR) Council. I believe this platform is suitable for several agencies involved in the development of digital-based entrepreneurship. My ministry is one of the members of this council. When this council convenes, what the Honourable Member has just mentioned is among the matters we will put forward in the council so that the various inter-ministry actions can be implemented. Thank you.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Thank you, Mr Speaker. Supplementary question. I would like to ask the Honourable Minister, does the government have a strategy for SMEs (PKS) in Kuala Lumpur that have not been fully digitalised and still operate manually? What efforts have been made to upgrade these PKS? Thank you.

Datuk Ewon BenedickUPKO · PHPenampangEN

I apologise, Honourable Member. I am not quite clear about the question raised by the Honourable Member.

Tuan Fong Kui LunDAP · PHBukit BintangEN

The question is, does the government have a strategy for PKS in Kuala Lumpur that have not been fully digitalised and are operating manually, and what efforts have been made to upgrade these PKS? Thank you.

Datuk Ewon BenedickUPKO · PHPenampangEN

For the Honourable Member's information, under the Budget 2023 initiative, many digitalisation initiatives have been provided and implemented by various agencies and ministries, including under my ministry. I believe the matter raised by the Honourable Member just now is included in the budget initiatives I mentioned earlier. However, I will provide the Honourable Member with more detailed information on which initiatives are suitable for the matter raised just now. Thank you.

Shamshulkahar bin Mohd DeliUMNO · BNJempol · questionEN

7. Dato' Haji Shamshulkahar bin Mohd Deli [Jempol] asked the Prime Minister to state the government's consideration of increasing the allowance for mosque imams, who currently receive only RM850 a month from JAKIM, which is clearly below the minimum wage level, taking into account the rising cost of living.

Dato’ Setia Dr. Haji Mohd Na’im bin Haji MokhtarMinister in the Prime Minister's Department (Religious Affairs)EN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Mr Speaker, thank you, the Honourable Member for Jempol. Mr Speaker, for the information of the Honourable Members, the appointment of kariah mosque imams falls under the jurisdiction of the State Islamic Religious Council (MAIN) or the State Islamic Religious Department (JAIN). Meanwhile, the Department of Islamic Development Malaysia (JAKIM) acts as the coordinator at the Federal level.

Dato’ Setia Dr. Haji Mohd Na’im bin Haji MokhtarMinister in the Prime Minister's Department (Religious Affairs)EN

However, the Federal Government assists state governments by providing monthly allowances to kariah mosque imams and penghulu mukim imams across the country, which began in January 2005 at a monthly rate of RM450 at that time. In 2011, during the tabling of the Budget 2011, the then Honourable Prime Minister announced an increase in the monthly allowance for kariah mosque imams to RM750 a month. Through the tabling of the Budget 2017, announced by the then Honourable Prime Minister in October 2016, the government agreed to once again increase the monthly allowance for imams to RM850 a month. In 2022, the Department of Islamic Development Malaysia (JAKIM) channelled an allocation of RM146,604,600 to the states for the payment of monthly allowances to 14,373 kariah mosque imams across the country. The Federal Government is also very sensitive and constantly reviews and assesses the monthly allowance for kariah mosque imams from time to time, and also based on the country's financial situation. Mr Speaker, it must be emphasised here that the RM850 monthly payment is an allowance, not a salary, and cannot be compared with the minimum wage level. Apart from the monthly allowance of RM850, they are also enrolled in PERKESO (Social Security Organisation) and receive a one-off assistance. In 2023, the payment given was RM600, compared with RM500 in the previous year. Thank you.

Supplementary question. Thank you, Honourable Member, for the explanation just now. So, my question is, does JAKIM intend to convert this allowance into contract posts for imams who are already being assisted by the Federal Government or JAKIM? I suggest, or my question is, does JAKIM want to create contract posts for imams across the country as has been stated earlier? So that it provides a stable income and at the same time will attract especially the young, to take up the post of imam. For example, if we contract one imam, senior imams are appointed, and for imam two, young imams, our huffaz, are appointed. So, I am confident that if we convert this post from allowance to contract posts, it will attract especially young people to approach the mosque, especially our huffaz from tahfiz centres and those with Islamic studies backgrounds, whether from within the country or from abroad. Thank you.

Thank you, Mr Speaker. Thank you, the Honourable Member for Jempol. Thank you for the concern of the Honourable Member for Jempol regarding the status of the posts. We have discussed in the first question earlier the allowance that has been given by the Federal Government to the imams.

Regarding this supplementary question, on the matter of permanent or contract posts, as I explained at the beginning, the post of imam is a state appointment. If we take the example under the Islamic Law Administration (Federal Territories) Act 1993 [Act 505], the appointment of imams in the Federal Territories is under section 76, which provides that the posts of mosque naqib, imam and bilal shall be posts in the federal public service. So, I think, since this power lies with the state, we can propose a template like that under Act 303 in the Federal Territory, where permanent posts have been provided for imams in the mosques of the Federal Territory. It can be proposed here that the state authorities recommend to the state government to create or put in place the same provision as under Act 505, so that imams at the state level can be appointed as in the Federal Territories. So, I think in this way I agree with what the Honourable Member for Jempol said earlier, that if these posts are permanent posts, it can further encourage young people to become imams. Mr Speaker, I mentioned earlier regarding the allowance. The allowance given by the Federal Government is one of the ways or initiatives to encourage. Therefore, we use the term allowance here. This means that imams who serve at the state level, some of them are—sometimes they are takmir teachers, ustaz, and others, and at the same time serve as imams in mosques. So, with the allowance given by the Federal Government, it will encourage them to become permanent and serve as imams in the states. I think that is the function of the assistance given by the Federal Government. Thank you.

mosques in the Federal Territories, Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you. I invite the Honourable Member for Kuala Krai.

Thank you, Mr Speaker. Supplementary question, what is the government's long-term plan from the perspective of restructuring imams' salaries to ensure that more talented young people are interested in choosing the post of imam as a career. Apart from the issue of allowances or this allowance issue, does the government intend to introduce an education assistance scheme so that these imams can add new knowledge and skills, whether through short-term or long-term courses that can add to their knowledge and also enhance their credibility in their duties. Thank you, Mr Speaker.

Thank you, Mr Speaker. Thank you, the Honourable Member for Kuala Krai. I agree with the proposal put forward by the Honourable Member for Kuala Krai just now. I think the courses held and the continuous training given to these imams are very important in adding to their knowledge. So, I think in this context, JAKIM can coordinate and discuss with the state religious bodies, the State Islamic Religious Councils and also the state Islamic religious departments, to see how the coordination of knowledge enhancement training can be provided to the imams, especially to the young, to enable them and to increase their interest in being appointed as imams in the states. Thank you, Honourable Member.

Another one, can, another one, Honourable Member?

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Next question. I invite Dato' Seri Dr. Shahidan bin Kassim, the Honourable Member for Arau.

[Dewan riuh]

Yes... Push the plank, pull the plank, Keranji fruit in the boat, My question, number eight, Please answer, we want to know.

Shahidan bin KassimPAS · PNArau · questionEN

8. Dato' Seri Dr. Shahidan bin Kassim [Arau] asked the Minister of Domestic Trade and Cost of Living to state the role and latest achievements of the National Action Council on Cost of Living (NACCOL) established during the previous government, as the cost of living remains high and is seen to be increasingly burdening the people of Malaysia.

Puan Hajah Fuziah binti SallehPKR · PHDeputy Minister of Domestic Trade and Cost of LivingEN

Bismillahi Rahmani Rahim. Thank you, Mr Speaker, the Honourable Member for Arau. As all of us are aware, the National Action Council on Cost of Living (NACCOL) was reactivated in 2018 after being established in 2017. It functions as the main body for addressing issues and challenges relating to the cost of living of Malaysians. Honourable Member for Arau, the structural framework of NACCOL is divided into three levels, namely: (i) the highest council; (ii) the executive-level committee, and (iii) the cluster working group committees. Since the Unity Government took over, we have added another committee, namely the Implementation Monitoring Committee, which is chaired by the Honourable Deputy Prime Minister. Its purpose is to coordinate the implementation of strategies and action plans to address the cost of living issue more effectively. The Honourable Member for Arau is well aware that addressing the cost of living comprehensively and thoroughly is a continuous effort. I think the Honourable Member for Arau is more knowledgeable. There are challenges involving multiple dimensions, including structural, global, weather, the value of the ringgit and so on. So, in this regard, the initiatives drawn up by NACCOL will focus on a two-pronged strategy, namely tackling inflation and rising prices of goods and services, and increasing people's incomes. This is under the people's income initiative. So, there is a two-pronged approach so that there is a situation where spending power is in the hands of the people so that they can cope with this situation. Mr Speaker, I would like to refer to the Consumer Price Index. The Consumer Price Index shows that the rate of inflation increase is on a lower upward trend in January 2023 compared with 2022. This means it is still high but there is a lower upward trend. So, with that, temporary measures, with permission, Mr Speaker, we take the approach of Menu Rahmah, Jualan Rahmah and so on as short-term measures to help the people while we address the increase in incomes so that they have spending power. So, many initiatives through Jualan Rahmah, the Payung Rahmah initiative, and at the same time, we are also targeting subsidies, we have held workshops to target subsidies compared with before, we used the bulk subsidy strategy. However, we have already held specific workshops to target subsidies so that they can go directly to those in need, which are among the things being done to address the cost of living. Thank you, Honourable Member for Arau.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member for Arau.

Mr Speaker, the question just now is as usual, I am not satisfied and I believe the people of Malaysia are also not satisfied. So, Honourable Member, one of the reasons for the increase in prices of goods is because industry players raised the prices of goods. We have recently raised tariffs, but industry players passed the tariff increase on to consumers, so the prices of consumer goods went up. So, I would like to ask, does the government intend to withdraw the tariffs imposed on industry players in order to

enable us to lower the cost of goods? Honourable Minister, how many times a week is this meeting held? Lastly, what the Honourable Member for Ayer Hitam raised yesterday regarding cartels, mentioning the name Deepak. Is this Deepak part of a cartel, and how did the government decide to award a tender to Deepak which will have an impact on the cost of living? Thank you.

Thank you, Honourable Member for Arau. This committee is not the same as the Jihad Committee, of which the Honourable Member for Arau was formerly part. Jihad team, yes.

This is because I am informed that the Jihad team does indeed meet every week, yes.

Tuan Cha Kee ChinDAP · PHRasah

[Bangun]

However, Honourable Member for Arau, if you understand that once the prices of goods have gone up, even if we lower tariffs, they will not come down, Honourable Member for Arau.

Tuan Tan Hong PinDAP · PHBakri

[Bangun]

So, what we need to do now is help the people to increase their spending power. That is why Jualan Rahmah is very helpful, and Menu Rahmah also helps because it reduces the rate of increase in the price of cooked food eaten outside the home, Honourable Member for Arau. We can see there is a reduction in the increase in terms of the inflation rate.

Dr. Mohammed Taufiq bin JohariPKR · PHSungai Petani

[Bangun]

So, Honourable Member for Arau, regarding cartels, that relates to other ministries. It does not relate to this ministry, yes, Honourable Member for Arau. I hope the question will be channelled to the relevant ministry. Thank you.

Mr Speaker, Jelebu.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

The Honourable Member for Gopeng.

Jelebu.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

The Honourable Member for Gopeng.

Jelebu, Mr Speaker.

Tuan Tan Hong PinDAP · PHBakri

Bakri dulu.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Already given to the Honourable Member for Gopeng.

Thank you, Mr Speaker.

Tuan Tan Kar HingPKR · PHGopengEN

Honourable Member for Gopeng, Honourable Member for Gopeng.

Honourable Minister, I want to...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I am giving the opportunity to the Honourable Member for Gopeng.

Oh, I heard Jelebu. [House laughs]

Tuan Tan Kar HingPKR · PHGopengEN

Thank you. Sorry, yes.

Tuan Tan Hong PinDAP · PHBakriEN

Bakri has been standing for a long time, Mr Speaker. Today only the Honourable Member for Gopeng seems to be standing.

Tuan Tan Kar HingPKR · PHGopengEN

Close, the closest.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

The Honourable Member for Bakri is not handsome enough.

Tuan Tan Kar HingPKR · PHGopengEN

Alright, thank you to Mr Speaker. [Laughter] Thank you to Mr Speaker. My follow-up question earlier, the Honourable Deputy Minister actually mentioned the Special Jihad Task Force on Inflation, of which the Honourable Member for Arau was then part. Therefore, my question is whether the Special Jihad Task Force on Inflation still exists, and also how effective the Special Jihad Task Force on Inflation, established in June last year, has been?

Thank you, Honourable Member for Gopeng. For the information of this august House, Mr Speaker, that task force is no longer continued because we found there was indeed no effect. If we look at the inflation rate, it has been the same from last year until now, and we see that this year there is a slight reduction in terms of its increase. So, we have not continued the meetings. Moreover, holding meetings twice a week is not effective. So, there is no continuation in terms of that committee. Thank you.

Chow Yu HuiDAP · PHRaub · questionEN

9. Tuan Chow Yu Hui [Raub] asked the Minister of Higher Education to state the ministry's willingness to repeal the Akta Universiti dan Kolej Universiti 1971 (AUKU) and replace it with a new Higher Education Act based on the policy paper of the Technical Committee on Repeal of AUKU established in 2018, together with a timeline and work plan for the repeal of AUKU.

Dato' Mohammad Yusof bin ApdalWARISANDeputy Minister of Higher Education · Lahad DatuEN

Thank you, Mr Speaker. Thank you, Honourable Member for Raub, for the question raised. The Ministry is of the view that the AUKU remains relevant in enforcing its functions. However, the Ministry is always mindful of and responsive to the aspirations of various parties who wish for the AUKU to be improved from time to time. As I informed the Honourable Member during the earlier sitting of the Special Chamber, basically, the AUKU has undergone seven amendments since it was gazetted in 1971, and the most recent amendment, in 2019, repealed section 15(2)(c) of the AUKU, which gave students more room and freedom to speak out and engage in politics on campus and off campus. This means that the Ministry always takes into account the views and constructive suggestions of all parties in order to improve the AUKU. The Ministry is also of the view that matters seen as capable of being improved or amended should be given due attention and consideration. However, looking at the importance of the AUKU in establishing governance and the relationship between the accountability of higher education institutions (IPT) and the government and society, the Ministry holds the position that the approach of amendment is more appropriate than repealing the AUKU entirely. Moreover, if a new Act were introduced to replace it, it would only end up re-adopting and reusing most of the existing provisions found in the AUKU. Such an action is no different from merely changing the skin. Regarding the Technical Committee to Repeal the AUKU 2018, the recommendations and findings of the committee have been acted upon, and there are several matters that

Dato' Mohammad Yusof bin ApdalWARISANDeputy Minister of Higher Education · Lahad DatuEN

are being refined. For example, following the 2019 amendment that allows students to engage in politics on and off campus and to contest in elections, the implementation of the first phase, which is being finalised, is to develop several appropriate guidelines. These guidelines aim to give students greater freedom in managing student activities in participating in political activities on and off campus in a safe and orderly manner. They are currently being refined before being circulated to all public universities for action and implementation. The second phase will look at the need to amend or repeal several further provisions in the AUKU. This second phase had already begun in early December 2022. At present, the Ministry is studying all provisions relating to students in the AUKU, particularly those concerning the accounts and finances of student associations. In addition, regarding the action plan and timeline for the next amendments and improvements, as was also informed during the winding-up of the debate at the Policy Stage the other day, the Ministry is in the process of organising an engagement session, or town hall, that will involve all stakeholders on a date to be announced later. Based on the town hall session later, the Ministry will refine the findings obtained and consider them together with the various other findings and suggestions that have been submitted to the Ministry. In short, the Ministry is of the view that the AUKU is an important, relevant Act that functions well. Any weaknesses found in it can be refined and improved through amendment and not repeal. Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member for Raub.

Tuan Chow Yu HuiDAP · PHRaubEN

Yes, Mr Speaker. Although the AUKU has been amended seven times, we can see that students' rights are still being curtailed. For example, last year before the GE, activist Fahmi Reza held several democracy classes at UM, UKM and UIAM. However, the universities prohibited him and expelled him. Can the Honourable Minister answer: if only the AUKU is amended, how can the freedom of students be guaranteed in terms of financial autonomy and also the right to hold activities? This is because we know that the core problem of the AUKU is the absolute power in the hands of the NC and also the HEP. If it is not repealed, the absolute power will not be transferred from the NC and HEP to students or student unions, namely student unions. Thank you.

Thank you, Mr Speaker, thank you, Honourable Member for Raub. For the information of the Honourable Member for Raub, as I stated earlier, the AUKU has undergone seven improvement amendments. These improvements largely touch on students' rights and freedoms. We see that among the issues that seem most emphasised in the matter of repealing the AUKU is politics.

Tuan Tan Hong PinDAP · PHBakri

[Bangun]

Therefore, the government, through the MOHE, has amended several sections in terms of giving freedom, firstly, in terms of politics. Therefore, in relation to elections touching on political freedom, several public IPTs have had powers returned to students to hold campus elections, and it is no longer Student Affairs that organises them. For example, in December 2022, two public universities were involved, namely Universiti Sains and Universiti

Malaysia Sabah, where campus elections were fully implemented under the authority of students.

Likewise, in January 2023, nine public universities were involved, namely Universiti Teknologi Malaysia, Universiti Utara Malaysia, Universiti Malaysia Sarawak, Universiti Pendidikan Sultan Idris, Universiti Tun Hussein Onn Malaysia, Universiti Malaysia Pahang, Universiti Malaysia Perlis, Universiti Malaysia Kelantan, and Universiti Pertahanan Nasional Malaysia. In February 2023, three public universities were involved, where students fully conducted these elections without any administrative interference from the university, namely Universiti Kebangsaan Malaysia, Universiti Teknikal Malaysia Melaka (UTeM), and Universiti Malaysia Terengganu.

Tuan Tan Hong PinDAP · PHBakri

[Bangun]

Dato' Saifuddin bin AbdullahBERSATU · PNIndera Mahkota

[Bangun]

The remaining six public universities in our country, out of a total of 20, cannot yet hold them now. This is the main reason: their terms have not yet ended. However, we believe and we will ensure that when the term arrives, six universities, namely Universiti Teknologi MARA (UiTM), Universiti Sultan Zainal Abidin, Universiti Islam Antarabangsa Malaysia (UIAM), Universiti Sains Islam Malaysia, Universiti Putra Malaysia and Universiti Malaya, will once again have campus elections fully conducted by students, and the selection of the Student Representative Council will take place in the coming period. In relation to the powers restricted under the AUKU sections originally, which we have also improved, we have fully given these students the power to manage the funds given to them. To organise activities using their own funds in their accounts. That too we have given. Back to student power. Thank you, Mr Speaker. Looks like there are questions.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member for Indera Mahkota.

Dato' Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Yes. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan soalan.

Dato' Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Mr Speaker, thank you, Honourable Deputy Minister. However, I think the Honourable Deputy Minister does not understand the spirit behind the supplementary question given. Never mind, we can discuss that another time. But the AUKU issue is not only about student affairs. It is broader than that. It concerns governance at public universities, and it is also related to other Acts such as the PHEI Act. When we are slow to make decisions on the establishment of the University of Tsukuba, that is a classic example of the weaknesses under the AUKU. The purpose and spirit of the AUKU 1971, and its biggest amendment in 1975, are not the same as the spirit of today. Today we discuss university autonomy, academic freedom, public intellectuals, Undi18, strengthening co-curriculum...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, your question.

Dato' Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Yes. The role of professors and retaining of senior professors. So, I hope the government is serious about repealing the AUKU and replacing it with a more comprehensive Act.

Thank you, Mr Speaker, and thank you, Honourable Member for Indera Mahkota, for this question...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Please summarise your reply as well.

Yes. On the question and suggestion just now. In summary, we will take into account the views as I stated earlier. Whatever suggestions and proposals there are, we will give consideration and, God willing, will provide improvements to this AUKU. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, now the session for Questions for Oral Answer today has come to an end. Thank you, Honourable Member. [End of time for Questions for Oral Answer]

Mr Speaker, Point of Order 36(12). Just now, sorry, Honourable Minister.

Datuk Ugak anak KumbongPRS · GPSDeputy Minister in the Prime Minister's Department (Sabah, Sarawak and Special Duties) · Hulu Rajang

[Bangun]

The Honourable Minister said that my earlier question did not fall under the Honourable Minister's ministry. There is a commission, namely the Malaysia Competition Commission (Suruhanjaya Persaingan Malaysia), under the Competition Act, which sits under the Honourable Minister's ministry. So, when I asked about cartels just now, it falls under the Malaysia Competition Act. So, I ask the Honourable Minister– As time is insufficient, please answer in writing, because the question I raised just now falls under the Honourable Minister's ministry and not under other ministries. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Just give a written reply.

If possible, today, and I will take the appropriate action.

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Datuk Ugak anak KumbongPRS · GPSDeputy Minister in the Prime Minister's Department (Sabah, Sarawak and Special Duties) · Hulu RajangEN

[Laughter] Okay, Honourable Member for Arau. Thank you. Mr Speaker, "Under Standing Order 12(1), I respectfully move that the Sitting today shall not be adjourned until the debate and decision at the Committee stage for the Ministry of Natural Resources, Environment and Climate Change, the Ministry of Local Government Development and the Ministry of Domestic Trade and Cost of Living for the Supply Bill 2023, and the Development Expenditure Estimates Motion 2023 have been completed, and after that the Sitting shall be adjourned until 10 a.m. on Monday, 20 March 2023." Thank you.

Puan Teo Nie ChingDAP · PHDeputy Minister of Communications and Digital · Kulai

Saya menyokong.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, I now put the question to the House for decision. The question is that the motion as just moved be agreed to.

[Motion moved for decision; and agreed to]

Bill Brought Into the Meeting — Penal Code (Amendment) Bill 2023 First ReadingBill

A Bill entitled an Act to amend the Kanun Keseksaan; brought into the Sitting by the Minister in the Prime Minister's Department (Law and Institutional Reform) [Dato' Sri Azalina Othman Said]; read the first time; to be read a second time at this Sitting.

Bill — Criminal Procedure Code (Amendment) 2023 First ReadingBill

A Bill entitled an Act to amend the Kanun Tatacara Jenayah; brought into the Sitting by the Minister in the Prime Minister's Department (Law and Institutional Reform) [Dato' Sri Azalina Othman Said]; read the first time; to be read a second time at this Sitting.

Bill — Supply Bill 2023 and Development Estimates Motion 2023 CommitteeBill

The Order of the Day and the motions were read to resume consideration of the "Supply Bill 2023 and the Development Expenditure Estimates Motion 2023 in the Committee of the Whole House." [Fourth Day] [House in Committee] [Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair of Committees]

Bill — Supply Bill 2023 and Development Estimates Motion 2023 Committee — Head B.23 [Schedule] – Head P.23 [Development Estimates 2023] –Bill

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Operating Expenditure Head B.23 and Development Head P.23 under the Ministry of Natural Resources, Environment and Climate Change are open for debate. I will read out the list of speakers for this afternoon, namely the Honourable Member for Puchong, the Honourable Member for Kemaman, the Honourable Member for Parit Sulong, the Honourable Member for Mersing, the Honourable Member for Segamat, the Honourable Member for Setiu, the Honourable Member for Betong, the Honourable Member for Arau, the Honourable Member for Sri Gading, the Honourable Member for Masjid Tanah, the Honourable Member for Raub, the Honourable Member for Saratok, the Honourable Member for Tampin, the Honourable Member for Kuala Langat, the Honourable Member for Tebrau, the Honourable Member for Tangga Batu, the Honourable Member for Baram, the Honourable Member for Kuala Nerus, the Honourable Member for Muar and the Honourable Member for Tuaran. I invite the Honourable Member for Puchong.

Puan Yeo Bee YinDAP · PHPuchongEN

Thank you, Mr Chairman. I would like to refer to page 246, B.23, Item 050100 and also page 254, Item 07200. I would like to draw the attention of all Honourable Members to the expenditure between these two items. Item 050100 – Environment, this is expenditure for the Department of Environment amounting to RM115,450,600. Meanwhile, Item 07200 – Environmental Regulation is expenditure to pay a private concession company under– called PSTW under the Environmental Quality Monitoring Program amounting to RM86,907,000. I have repeatedly raised in this honourable House since the last session that the government needs to renegotiate the EQMP Concession Agreement. This 15-year concession agreement was signed in 2017 with a total value of RM952 million. The original objectives of the EQMP are to report the status of environmental quality, provide input for the enforcement of the JAS and also provide early warning of pollution. However, from the experience of the Sungai Kim Kim incident, I find that the EQMP has not achieved its objectives. In addition, the EQMP also does not help much in the JAS enforcement actions. Less than five per cent of JAS enforcement actions originate from EQMP warnings. Why must we pay RM60 to RM80 million more every year to a private company that has not achieved its main objective? When the JAS, year after year, does not receive sufficient financial support to carry out its duties in pollution control.

Puan Yeo Bee YinDAP · PHPuchongEN

Let us not be like 'the monkey's young in the forest are nursed while its own young starve'. If the Honourable Minister goes to the JAS branches, the Honourable Minister will find that the JAS does not have sufficient equipment. Vehicles are not enough. Sometimes they have to borrow from local authorities for operations and so on. This is why I began reviewing the EQMP concession agreement in 2019 when I was still a minister, so that we could save money from renegotiating the EQMP and channel these savings to empower and improve the JAS machinery. Unfortunately, I was unable to complete the renegotiation before the Sheraton Move. I have personally read the concession agreement, it is so thick, eight centimetres. This agreement does have an exit clause, and only about 25 per cent of the annual payment that we have to pay is fixed cost. This means that there is a lot of room

Puan Yeo Bee YinDAP · PHPuchongEN

for renegotiation. The savings from renegotiation are at least, I estimate, RM27 million every year. Therefore, Puchong very much hopes that the Honourable Minister can restart the renegotiation, and if successful, this can give a very large financial injection to the JAS without involving more of the people's money. Next, Mr Chairman, I would like to refer to page 248, B.23, Item 071200 – Malaysian Green Technology and Climate Change Corporation (MGTC) allocated RM4,000,000. The MGTC was rebranded from the Malaysian Green Technology Corporation to the Malaysian Green Technology and Climate Change Centre in October 2019. The purpose was to make the MGTC the National Climate Change Centre (Pusat Perubahan Iklim Negara). One of the new roles for the MGTC is to be the coordinating body for climate change action between various ministries and the government, because the issue of climate change is multifaceted, with permission. Puchong would like to know, has the MGTC already played this role? Who is the secretariat for the Malaysian Climate Change Action Council? In addition, Puchong also wants to get the latest status of cooperation under the UK Partnering for Accelerated Climate Transitions (UK PACT) initiative. Next, I would like to refer to page 254, P.23, Item 13900 – Flood Control and Warning Signals Scheme. Puchong would like to get the latest status of the implementation of the Flood Forecasting and Warning Programme (PRAB). For the information of this honourable House, PRAB was established after major floods in eight states in December 2014 which recorded 25 deaths, 500,000 people displaced, with destruction costs of RM3 billion. Among the objectives of PRAB is to improve the capacity of warning and dissemination systems to the public from six hours to two days earlier for monsoon floods and one to three hours earlier for flash floods. However, it seems that the major floods happening now still occur without warning. Puchong would like to get the details of this project. How much has been spent? Has this project already failed to achieve its original objectives? Finally, page 255, Item 80000 – National Sewerage Project. Puchong would like to know what is the latest status of the Langat centralised sewerage project? That is all.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Puchong. I invite the Honourable Member for Kemaman.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you to Mr Chairman for giving me the opportunity to join the debate at the Committee stage for B/P.23 of the Ministry of Natural Resources, Environment and Climate Change. Mr Chairman, I refer to Item 050000 – Environmental and Climate Change Management. The allocation for the Ministry of Natural Resources, Environment and Climate Change has increased by 8.4 per cent compared with last year, congratulations. The issue of climate change is a critical matter and requires serious action from the government. The effects of climate change are felt in Malaysia, in our country today, especially when we look at the recent developments with the frequent floods that occur in our country today. In addition to the call for the immediate tabling of a national Climate Change Act and the establishment of a Special Select Committee on Environment and Climate Change to address climate change and avoid major losses due to disasters and calamities that occur, I urge the ministry to establish a Department of Climate Change with an increase in the number of officers focusing on climate change to ensure and demonstrate our country's seriousness in addressing this issue.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Mr Chairman, I now refer to Item 13900 – Flood Control and Warning Signal Plan. Debris flood disasters are the main phenomenon causing deaths and large-scale destruction of the environment as well as property. Our country also frequently experiences debris floods, namely in 2021 and again in 2022. Therefore I would like to ask the ministry: what holistic mitigation and adaptation measures are being implemented in the country to deal with debris flood disasters over the long term? I would also like to know the status of the implementation of the sabo structure construction projects that the previous government planned to build throughout the country in an effort to reduce the risk of debris floods. Is the construction of sabo structures still continuing and, if so, how far has the work progressed up to today? In addition, I also propose establishing an early warning system covering debris flow and debris flood disasters to reduce the impact of geological disasters in high-risk areas across our country. Besides that, I propose that mapping and periodic monitoring of potential areas where debris flows and debris floods have previously occurred be carried out in the management of flood risk reduction and geological disasters throughout the country. This matter is a priority because area mapping is an important mitigation measure to ensure that development and settlement do not take place in high-risk areas. Although debris floods rarely occur like monsoon floods, this phenomenon frequently occurs in mountainous areas of our country today, starting from steep slopes down to the foothills of mountains. Prolonged heavy rain lasting four or five days, in addition to landslide conditions, has the potential for such floods to occur in our country. Therefore, I expect the government to take debris flood disasters seriously by providing special allocations to address this issue. Lastly, Mr Chairman, I move on to Item 15100 – Prevention of Coastal Erosion, where coastal erosion frequently occurs in the state of Terengganu in particular, and not least in Kemaman itself, in my constituency. There are several areas that I must raise here which need the ministry's attention so that joint action can be taken, such as Pantai Teluk Kalong, facing the Darul Iman Training Centre (DITC). It is a training centre run by the state government and requires serious attention to prevent the erosion occurring there. Likewise at the coast involving Pantai Geliga and Kuala Kemaman. It has already approached residential areas and public halls and, at the same time, is also close to a kindergarten, whose building could collapse at any time. That concludes my remarks. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kemaman. I invite the Honourable Parit Sulong.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman. I would like to continue with Item 13900 – Flood Control and Warning Signal Plan and also Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. I want to focus directly on my constituency, the Parit Sulong constituency. This year, within a month, there have been two floods. Village residents have indeed been very much affected by this flood situation.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

This time it is the worst. The Temporary Relief Centres (PPS) have been open for 19 days, and for the information of the Honourable Minister too, there are 103 PPS in the Batu Pahat parliamentary area, with 8,966 evacuee families and 31,581 evacuees. In the Parit Sulong parliamentary area alone, there are 36 active PPS. In Batu Pahat there are four parliamentary constituencies, Honourable

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Minister. This indirectly makes people's lives difficult and affects jobs and the economy. Therefore, my question to the ministry is: can the ministry explain specifically what short-term and long-term plans there are to overcome the flooding in Batu Pahat, especially in the Parit Sulong parliamentary area? Recently, the Most Honourable Prime Minister announced that all flood mitigation projects worth RM600 million would be expedited, beginning this June. My further question is: of the total that was announced, how much has been allocated to the Parit Sulong parliamentary area, and does the ministry have plans to replace water pumps that have been damaged or are not functioning, and does the ministry also have plans to install new pumps that can help reduce the risk of flooding? Previously, Honourable Minister and Mr Chairman, there was approval to install U Concrete along the road from Batu Pahat to Semerah for the purpose of reducing the risk of flooding. However, that allocation covers only half the road. My question to the ministry is: when will the additional allocation be approved, and I also want to know the latest status of the RTB Parit Kuda, Batu Pahat application? Next, to Item 15100 – Prevention of Coastal Erosion. We know that among the causes of this flooding are the big high-tide phenomenon that occurs due to, indirectly, global climate change, the high-tide phenomenon and coastal erosion. For the Parit Sulong parliamentary area, Honourable Minister, we have a mangrove area that we can see helps prevent this coastal erosion. My question to the ministry is: what are the ministry's plans to replant mangrove trees so that we can further strengthen efforts to control coastal erosion, which is one of the causes of this flooding? The focus areas I want to highlight are the Teluk Wawasan and Hentian Mahkota areas within the Parit Sulong parliamentary area. The final item I want to touch on is Item 15300 – Dredging of River Mouths and Item 060300 – Irrigation and Drainage. This drainage system, if we do not maintain it, if we do not dredge it, will indirectly contribute to drain water easily overflowing onto the roads and causing floods. Until 2018, these drains were maintained three times a year, Honourable, and my question to the ministry is: how much allocation is dedicated to cleaning these drains? Does the ministry have plans to restore the allocation for maintaining these drains to reduce the risk of this flooding, and I want to know the total amount for the Parit Sulong parliamentary area? I also ask the ministry to ensure that this allocation must be sufficient to maintain the drains in the Batu Pahat area in order to reduce – otherwise, 16 days already people have been sitting, still staying at this PPS. Therefore, does the ministry have a proposal to restore these drains so that they are maintained at least once every three years? That is all, Mr Chairman.

Setahun sekali.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

We need to restore it to three times a year. Sorry, I got it backwards. Three times a year, to reduce – it can help in facing this flood risk, because there are so many complaints from village heads, and I think the Honourable Sri Gading will also support this application and my question. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Parit Sulong. I invite the Honourable Mersing.

Thank you, Mr Chairman. Firstly, I refer to Item 020100 – Department of the Director-General of Federal Land and Mines (JKPTG). I would like to refer to the RUU Harta Pusaka Kecil that was passed in 2021. I would like to ask whether staff have been added to further expedite the small estate processes and matters? This addition of staff is also to reduce the burden borne by existing staff. Secondly, referring to Item 020300 – Minerals and Geosciences. I would like to ask the National Geopark Committee: what is the latest status of the Mersing Geopark? Mersing has been selected as the first National Geopark candidate in Johor because of its uniqueness and distinctive features. Mersing holds the earliest volcanic eruption records in Southeast Asia and important Earth developments dating back 300 million years. Will the government continue the development of this project, given that this development project is very good for the tourism economic sector in Mersing, as well as for preserving natural treasures and the rich marine biodiversity such as the dugong, and the culture in Mersing?

Tuan Tan Kar HingPKR · PHGopengEN

Excuse me, I seek the floor. Gopeng.

Tuan Tan Kar HingPKR · PHGopengEN

Alright. Thank you, Honourable Mersing. Thank you to Mr Chairman. I would like to suggest to the Honourable Mersing that he include in his speech that the Kinta Valley Geopark in Perak and the Lenggong Geopark also appeal to the ministry for an excess allocation to develop those areas, because I see that the government's efforts are aimed at discovering new geosites, for which a target of 39 has been set this year. If the effort is only to discover new geosites, but they are not maintained or developed properly, I think that effort will be wasted throughout the year. Thank you.

Okay. Please include my speech. Thirdly, referring to Item 030100 – Peninsular Malaysia Forestry. I would like to ask about the latest status of the 100 Million Trees Planting Campaign and to what extent Members of Parliament are involved in this programme? Fourthly, referring to Item 030200 – Wildlife Conservation and National Parks. I would like to ask about human-wildlife conflict. How will the government reduce this conflict given the increasing number of wildlife attacks, especially by elephants, on farms and plantations? Fifthly, referring to Item 060100 – National Hydraulic Research Institute of Malaysia (NAHRIM). I would like to ask whether the government is conducting a study to ensure sufficient water supply in Orang Asli villages and islands, especially the Orang Asli villages and islands in Mersing? Sixthly, referring to Item 070900 – Johor Elephant Sanctuary (JES). I understand that the Johor Elephant Sanctuary will begin operations in mid-year in the Kota Tinggi district. The purpose of building this centre is, among others, to strengthen elephant management in Johor by reducing the problem of wild elephant disturbances in agricultural areas and settlements. My question is, what types of action will be taken to ensure that the elephant herds that often roam in agricultural areas and settlements in the districts of Kota Tinggi, Mersing and Kluang, after the operation of this Johor Elephant Sanctuary, are controlled?

Seventhly, referring to Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. I would like to request that the government consider and expedite approval of: (i) the Sungai Muar Flood Mitigation Plan (RTB) Phase 3 in Segamat; (ii) the Flood Mitigation Plan (RTB) Batu Pahat; and (iii) the Sungai Tenglu Besar Flood Mitigation Basin, Mersing. That concludes my remarks, thank you Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Mersing. I invite the Honourable Segamat.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Thank you, Mr Chairman. I wish to begin the debate at the Committee stage on the Ministry of Natural Resources, Environment and Climate Change (NRECC). With permission, we must move from managing disaster to managing risk because instead, we are spending so much on disaster instead of spending on the risk management. With this, I begin with Item 13500 – Dam Rehabilitation. I would like to draw the Honourable Minister's attention to the restructuring of the dam system in the Segamat district and the surrounding areas. I hope that a significant increase in allocation, RM80.76 million, can be focused as effectively as possible to carry out dam rehabilitation work urgently, especially in the flood red zones in the state of Johor.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

As the Honourable Member is well aware, the stagnant flood scenario or water levels that have not receded, experienced in several areas of the Batu Pahat district as mentioned by the Honourable Parit Sulong earlier, was caused by the overflow of river water from Segamat as well as from dams. As of 3 March, the water level at the Bekok Dam, Segamat, had exceeded 20.75 metres compared with the normal reservoir level of 16 metres. I request the good offices of the Honourable Minister to provide a reasonable allocation to ensure that the water drainage problems at the Bekok Dam and other dams that are detrimental during the flood season are resolved. Next, Item 14500 – Upgrading Urban Infrastructure and Drainage, Flood Mitigation. As emphasised by the Most Honourable Prime Minister, the implementation of flood mitigation must be expedited as early as June this year. That is a positive matter for Segamat, as this will help solve the flood problems. Approximately RM117.72 million has been allocated under this item, and it is hoped it can be focused on constructing flood mitigation with flood-resistant technology, with permission. I have also been informed, from the statement of the Director-General of JPS, Dato' Ir. Dr. Md Nasir bin Md. Noh, that JPS will use the design-and-build method in implementing flood mitigation plans in the state of Johor, which is said to be a faster and also more effective method. In connection with this matter, I would like to seek the Honourable Minister's explanation on several points. Firstly, to what extent will the design-and-build method to be used in constructing these flood mitigation plans (RTB) truly be efficient in preventing floods from occurring?

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Secondly, has the ministry, through the Department of Irrigation and Drainage (JPS), already carried out a cost-benefit analysis (CBA) of the proposed method of constructing these RTB? If so, I ask the Honourable Minister to briefly state the findings of the CBA that has been carried out. Thirdly, what criteria and evaluation will be set as a requirement in selecting the operating or implementing companies for RTB projects? To what extent will these criteria truly guarantee the credibility and commitment of the implementing party to carry out RTB projects in accordance with the schedule as well as the quality control, with permission, that is set for the single construction of RTB especially in the state of Johor? Next, Item 060300 – Irrigation and Drainage. Mr Chairman, Segamat also wishes to ask, how frequently is river, drain and ditch maintenance work carried out, if any, at JPS Segamat? This is because most flood-affected places in Segamat are rural areas, yes, and we see that among the causes of stagnant water that does not recede is that the irrigation system is not maintained according to schedule. I have also been informed by village folk that there are still people staying at the PPS in the Segamat district because of the stagnant water that occurred in Kampung Batu Badak and so on. It sometimes takes a month for them to return home, because among the reasons is that these maintenance issues are still not according to schedule, I think. I would also appreciate clarification from the Honourable Minister. With the allocation provided, I propose that river, drain and ditch maintenance work, which is also among the causes of flooding, be carried out. I propose that it be done every month, especially in areas that have been identified as flood hotspots or red zones, with permission. So, with that, I also hope that the NRECC ministry will also focus on rural areas, especially flood-affected areas, so that we have a solution, because we not only lost money but in fact we lost a lot of investment. This is because Segamat is far from the main road, if we look from the Tangkak highway to Segamat. Among the reasons investors do not come to Segamat is because of flood and road issues there. Therefore, I also hope the Honourable Minister will provide a solution and help the voters and residents of Segamat. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Segamat. I invite the Honourable Setiu.

Peace be upon you, and the mercy and blessings of God. Thank you, Mr Chairman. I refer to Item 060300 – Irrigation and Drainage. Mr Chairman, I would like to request urgent allocation from the ministry for dredging work on the boat channel at the mouth of the Sungai Merang because the river mouth is shallow. According to JPS estimates, an allocation of RM500,000 is required for this dredging work. Tourist boats and fishing boats face difficulties going in and out of the jetty because of the shallow river mouth. Some have to be pushed, and more seriously, some boats have capsized after hitting sandbars when entering the mouth. Meanwhile, Pulau Redang, which is a tourist destination, and Jeti Merang, which is the jetty closest to Pulau Redang, will be reopened for tourism activities after being closed for six months, from October to February, due to the Northeast Monsoon.

Based on the ministry's reply last year, to overcome this problem in the long term, the construction project for a breakwater valued at RM200 million has been allocated under the third rolling plan of the 12th Malaysia Plan (RMKe-12). If it is approved, physical work or construction will begin at the end of 2024. I would like to ask about the current status of the approval for this project. However, even if it is approved, it will take a long time to be fully completed. Therefore, while the project is being completed, allocations are needed every year to deal with the problem in the short term, namely dredging the route, especially at the start of each year, that is, in January or February. This is because the river mouth becomes shallow and silted after big waves during the Northeast Monsoon, whereas preparations must be made for tourism activities that begin in March every year. I would like to propose that the Honourable Minister come down and see the situation for himself in the near future, to witness the problems faced by tourist boat operators and fishing boat operators. Do not forget to invite me along on that visit and, God willing, we will treat you to nasi dagang Terengganu, keropok lekor and so on. On the same matter, among the issues that often arise during floods is clogged drainage, which causes water to overflow, and rivers and drains that are not cleaned before floods occur, as well as the lack of a proper drainage system. I propose that the ministry, through the relevant agencies, conduct an early survey of the areas identified as facing this problem. Sufficient allocations need to be provided by the ministry, and cleaning work and other works must be carried out before the flood season arrives. What is happening a lot now is that the cleaning work is done while the floods are already hitting, and some of it cannot be done due to lack of allocation, on the grounds that it is already the end of the year. The issue of water cut-off during floods also needs serious attention from the ministry, because it causes residents to be cut off. Work to straighten and widen rivers needs to be expedited to prevent roads from being cut off by water during floods. In Setiu, there are four places where roads are cut off by water, namely: (i) the road from Sungai Tong to Pelong at Kampung Mak Bakas; (ii) the road to Masjid Pengkalan Merbau; (iii) the road from Chalok Kedai to Lubok Panjang; and (iv) the road at Kampung Bukit Langkap. Next, Item 040100 – Energy Management. What initiatives does the government have to expand the use of solar energy? Not only in the manufacturing industry, but it should also be extended to domestic use to minimise the use of fuel sources such as coal. What steps has the government taken to further develop and encourage the use of electricity generated from solar energy and to install solar energy on the roofs of homes and buildings respectively? Last, Item 050100 – Environment. I would like to propose that the environmental waqf instrument be promoted to ensure that environmental welfare will continue to be protected. This environmental waqf institution may endow any land as grazing areas for livestock, water catchment areas, flower gardens, children's playgrounds, recreational parks and any other form of benefit to the people in perpetuity. That is all, thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Setiu. I invite the Honourable Member for Betong.

Thank you, Mr Chairman, for the opportunity given to me to take part in today's debate, under items B and P.23 of the Ministry of Natural Resources, Environment and Climate Change. I will go straight to Item 29000 – Sarawak Water Supply Scheme. I see that this year there is no direct expenditure allocation compared with 2022, when RM153.736 million was allocated. This year, expenditure is only provided through loans amounting to RM140.792 million. Therefore, Betong requests details regarding this allocation. What types of projects are proposed under this allocation? Since water supply projects are also under the Ministry of Rural and Regional Development (KKDW), I would like to know what the scope of work under this item is and whether it is the same as or different from that under KKDW? Next, I turn to Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation. I see a significant increase in allocation from RM21.8 million last year to RM117.73 million this year. Could the Honourable Minister give a list of projects proposed this year under this item, particularly for Sarawak? Betong also requests that expenditure under this item be allocated to solve the flood problem in Betong town, because there are many cases where drains, culverts and rivers are shallow. Next, Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. The allocation this year is also very high, at RM1.0188 billion, which is almost double that of last year. I also want to ask the same question as before: please give a list of projects proposed this year for Sarawak, and also please allocate RTB expenditure for Betong town since floods occur everywhere. Therefore, technical agencies such as JPS, the Department of Irrigation and Drainage, are very important in helping to reduce flood risks and manage water resources sustainably. Next, Item 15000 – Small Works by JPS, Various States. This year only RM76.55 million has been provided. This is a significant decrease compared with RM149.16 million last year for rural parliamentary constituencies like ours in Sarawak. Small projects like these are very meaningful in solving problems in village settlements and longhouses, and also in cleaning rivers that often flood. Betong requests that this allocation be increased and, if possible, that every rural parliamentary constituency be allocated funds under this item. Finally, I raise the Item...

Honourable Member for Betong, may I interject, Honourable Member for Betong?

Saya habiskan...

Two minutes. Two seconds.

Just a moment, please. Finally, under Item 15300 – Dredging of River Mouths. This year, an expenditure allocation of RM207.66 million has been provided, an increase from RM90.36 million last year. The shallowing of river beds has been identified as among the contributors to the flash floods that frequently hit areas in Sarawak. How many rivers in Sarawak are categorised as having critical shallowing problems caused by sedimentation? They need to be cleaned to deepen the riverbeds so that water can flow quickly every time heavy rain occurs. Therefore, Betong asks that the Honourable Minister consider that part of the allocation under this item also be distributed to Sarawak, and if there are projects already proposed for Sarawak, I request a list from the Honourable Minister.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Honourable Member for Betong.

Dua-dua boleh.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Not enough time.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Honourable Member for Betong. Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, and Item 15100 – Prevention of Coastal Erosion. I would like the ministry to look at areas at risk of flooding and coastal erosion along the Batang Lupar, namely Kampung Semarang, Tanjung Riong Maludam, Sebuyau, Lingga and Kampung Batang Maro. I also touch on Item 15000 – Small Works by JPS, Various States. I hope this allocation can also be given to Batang Lupar for maintenance work on areas under JPS supervision in Batang Lupar. Thank you.

Ya, boleh?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Not enough time.

Sedikit sahaja.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Not enough. Not enough time. Please sit down.

Okey, kemudian.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Betong.

Okay, thank you, Mr Chairman. So, I request that the earlier points of the Honourable Member for Batang Lupar also be included in my debate. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Betong. I invite the Honourable Member for Arau.

Thank you. Assalamualaikum warahmatullahi wabarakatuh and good afternoon, respected and beloved Mr Chairman and all friends. Item 030100 – Peninsular Malaysia Forestry. I would like to give some views to the government. There is the Honourable Minister here. Whatever we do in this world, if we are serious, it will succeed. However, if we do things carelessly or just talk rhetorically like that, the people only see our talk, but the people want to see implementation. For example, when I asked about the cost of living. It is not enough to answer by just reading, and then it's over. He must explain in detail how the cost of living will be reduced in this way and that, so that the people are satisfied. Young people, look at how they give their answers. Not right. He must be serious and say that we will implement it like this and this will happen.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Arau, you are off topic.

Oh, yes, that is Item 030100. We are talking about forestry. Forestry is a very serious problem, Mr Chairman. Serious why? We are talking about forest clearing. The people who clear forests are not many. Sometimes it may involve only 100 people. However, the government has to spend a huge amount to solve the forest problem. We have seen several campaigns carried out before. Plant one million, plant 100 million. I would like to ask how many million have been planted? Because this is just a campaign. Mr Chairman, when you were sitting over there, you also heard us speaking. One million trees were promoted by the government. One million. Where is the one million? However, when I ran the one-million campaign in the Federal Territory, I nearly reached it. It was 500,000, and the other 500,000 could not be done because the government changed hands. Otherwise there would already be one million trees in the Federal Territory. So, we ask that the government be serious. If you promise one million, one million, but

want to solve the country's problems, Mr Chairman, one million is not enough. 100 million trees. So now we see the government giving RM32 million to the Malaysian Forestry Department. RM32 million, the government cannot do anything with that. I ask the government to add RM1 billion to this budget. We can do other things with it. Now, plant trees with RM1 billion. One billion trees. Sorry, RM1 billion in allocation and the number would be millions of trees. The method is quite simple. For example, tree planting can be given to our friends, the Orang Asli and young people who are interested in nature. Let Malaysians plant. Previously I told schools themselves to propose that schoolchildren each plant one tree. A memory. When they leave school, there is a memory. I have left one tree at that school. There is a memory. For Malaysians, a memory. But for the country and the world, it is the biggest contribution. So, be serious. Now, I want to propose that this allocation be raised to RM1 billion. Let me give an example, Mr Chairman. Mr Chairman, have you ever gone to FRIM or not? We give FRIM RM62 million. FRIM is only an institute, Mr Chairman. However, the best institute protecting forests in this country and in the world is actually FRIM. They are given RM62 million, which is certainly not enough. We have to add more, but the department itself is given RM32 million. FRIM, the institute, RM62 million.

So I propose that FRIM be increased by RM1 million and the department be increased by RM1 billion. It is not much, because the forest will generate various benefits for us. So be a bit more serious, Honourable Member. If one million trees were planted, where is that one million? I ask the government to give attention to this matter, and states whose forests need to be restored should be given allocations to do so. Many states whose forests have been cleared, we must act. Like in Selangor, I also heard stories of forest clearing. The people who clear are not many, but why must we delay for so long? Why, when people first cut down the trees, did we not take action? When they plant oil palm, for example, like in Pahang where one area was planted with 10,000 acres, and I heard that the person received the title Tan Sri Dato' Seri, yet we did not take action. Once they have planted new trees, then we want to take action. Once they have planted Musang King durian trees, then we want to take action. Why did we not take action when they were cutting? Like floods, I propose that if we want to solve the flood problem, relocate people before floods, not during floods. Finally, I...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Finally, I want to wrap up, Mr Chairman. Please don't be like that. I know the Honourable Member is under pressure, and among the pressures, people accuse me of getting more time.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Do not waste time.

No. I will follow the rules. Finally— this last point must be allowed. Mr Chairman, it concerns the proposal that amendments be made to the Water Services Industry Act 2006. It proposes that the fine be increased from RM100,000 to RM10 million. Carry on. Then, the prison sentence from one year to 15 years. Carry on. However, KUASA, or Kumpulan Aktivis Sahabat Alam, proposes 30 years. I think we should take a middle path, 20 years. But do it now, do not wait until who knows when we will act. Do it now, make the amendment, because it affects the environment. Those who have committed offences, revoke their licences immediately. Thank you, Mr Chairman, for sympathising with us. I ask the Honourable Minister to answer properly. I no longer want written replies. Today, about

forests, the country wants to see proper answers. Young people will stay with me, we will take Selangor. Thank you. [Applause]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Arau. I invite the Honourable Member for Sri Gading.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, first of all, I support what the Honourable Member for Arau has said. I would like to ask the House which state has been hit by severe floods due to the management of logging. If we had good forest management, there would certainly be no floods in states that do not manage logging and forest projects carelessly. So, this is my question. Perhaps the Honourable Minister can answer which state has been flooded because of disorderly logging. The first point, Head P.23 Item 14500, which is the allocation related to Upgrading of Urban Infrastructure and Drainage, Flood Mitigation, is more than RM95 million. I wish to state in this august House that until today, floods in the Sri Gading constituency have caused 46 more PPS (temporary relief centres) since 1 March, which shows us that this persistent flooding problem is very worrying and causes stress to the people in my constituency. In the Parit Sulong constituency earlier, there were 36 or 34, but in the Sri Gading constituency there are 46 more. The question I want to raise is, when will flood mitigation projects begin in the Batu Pahat district, especially in the Sri Gading constituency? Second, list the number of flood mitigation projects in the Batu Pahat district, especially the Sri Gading constituency. For the information of this august House, in the Batu Pahat district there are 1,100 drains that need to be cleaned every year. However, we face problems when, at the end of the year, the allocation is usually no longer available, and the budget for JBS to carry out the cleaning or washing of these drains is gone. So sometimes we have to spend our own money as representatives of the people. Third...

Honourable Member for Sri Gading, Honourable Member for Sri Gading, may I interject? Just briefly. A suggestion, may I?

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Just a little more on this, there is a lot to say. Thank you.

Yes, yes. Thank you, Honourable Member for Sri Gading. This is about the matter relating to JPS and floods just now. I would like to propose, and I have proposed before, that JPS make a schedule and inform villages and village heads so they know when cleaning will be carried out. In that way, they can also be monitored and assisted in maintaining the rivers.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Okay, thank you. Include it in my debate. May I know what the JPS allocation for the Batu Pahat district or Johor state in particular is this year? On the flood problem that has just hit this constituency, there is one housing area, for the information of the Honourable Minister, Taman Santalia. It is a large drainage project next to Taman Putera Indah. The housing area has a large drain, but it passes under a main road where its culvert is small. The water coming out to the front, the drain there is also small. A large drain that flows into a small drain eventually causes the water to accumulate, causing Taman Santalia to flood, which has never happened since the area was built, reaching waist-high inside houses. So, this is something I hope this budget for upgrading urban infrastructure and drainage can be used to make corrections, because within the drain itself, in

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

...there are pipes in the drain, electricity and water pipes. So, if possible, please do act quickly so that it can be noted. Third, regarding local development. Sometimes local development develops an area but there is no retention pond. The pond that holds water when there is heavy rain. Previously there were places that were natural, that naturally could absorb water or could collect it in certain places. However, because the development is too extensive, the water has nowhere to go and flows straight into the drains, and from the drains it goes on into the village ditches and causes the surrounding villages to flood. The housing estate does not flood but the villages around it do. So, I hope that the retention pond project, especially at...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Oh, it's up. [Laughter] There is still a lot more. Just a little more I want to mention about the problem at...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up— later meet the Honourable Minister. Okay.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Can the Honourable Minister? Until 1.00 p.m., yes. Only a few minutes left. Just now the Honourable Arau took up my time. So, Taman Pura Kencana. Pura Kencana is a large estate but very good for local development. Only the problem is that there is no retention pond. This is just one point.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Sri Gading.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Oh... [Laughter] Is that so?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, time is up.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Okay, it should be until 1.00 p.m., Mr Chairman. Can I have just a little while?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

It's finished, thank you. I am the one who obeys the rules.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Masjid Tanah.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Thank you, Mr Chairman. I hope to finish within the five-minute break. I would like to touch on Item 08600 regarding Sustainable Forest Management (JPSM) and also Item 08601 – Planting of Mangroves and Suitable Species at the Coastline (JPSM). I would like to draw the attention of the Ministry to be able to look at and also give attention to the charcoal-slate industry located in Masjid Tanah, namely at Kampung Paya Lebar, which has been established for 100 years. I would like to ask whether there are any grants or assistance from the Ministry for this charcoal industry so that it can be managed well and also be inherited in the future. I would also like to ask about the extraction of mangrove trees, because mangrove trees are not like the extraction of timber trees, where mangrove trees lose their value the older they get. In contrast with timber trees, the older they are, the higher their value, whereas at a size of five to seven inches they are most suitable to be taken for making charcoal. This charcoal-slate business has been operated by Haji Darus since 1975, and there has not yet been any mangrove swamp area there that has become a field due to the process of extracting this mangrove wood. I would also like to ask about the approval process by the Forestry Department for the mangrove wood extraction industry. Next, I would like to touch on Item 050100 and Item 07200 regarding pollution in the rivers. For the information of the Parliament of Masjid Tanah, pollution is occurring in the Linggi River, where there is far too much rubbish that hurts the eyes and hurts the heart. This is because we often go down to the river, as Masjid Tanah is promoting and also paying attention to eco-tourism. So, when many guests and tourists come from outside and they ride boats and see rubbish, especially when the water is receding, this gives a very unattractive picture and is offensive to the eye. So, I hope the Ministry can give attention to this matter. The same goes for the rubbish in the drains and so on. I would like to draw the attention of the Ministry to look at the initiative undertaken in Indonesia by young people named Pandawara Group, who have a great many followers. They began by cleaning rubbish from the drains and eventually they sparked a high spirit of volunteerism among Indonesian youth to clean rivers and drains, and this is a very good effect. I would like to ask whether the Ministry has a similar initiative to help NGOs, volunteer activities or activists, especially in pollution, in helping efforts to clean the environment. Next, I would like to touch on Item 060300 – Irrigation and Drainage, which concerns the Department of Irrigation and Drainage (JPS), the maintenance of major rivers and periodic drainage channels in the Parliament of Masjid Tanah. As happens with flash floods in low-lying areas such as Kampung Bukit Apit in Petron Masjid Tanah, Kampung Ramuan China Besar, as well as Paya Lebar and also Taboh Naning. My side was involved in the engagement sessions on the Flood Mitigation Plan 2.0, and I hope this matter can be carried out quickly so that the flood problem can be tackled in future. I also hope that JPS together with the Local Authorities (PBT) can also coordinate mandatory requirements relating to the construction of retention ponds for every housing estate, as well as upgrading the drains on main roads. Next, I would like to touch on Item 07100 regarding the PERHILITAN monkey problem. Mr Chairman, the monkey problem is very critical in my Parliament. These monkeys cause a great deal of damage to crops, destroy property, including entering people's houses and pulling out all sorts of household equipment, and household property is destroyed. I hope that with the addition of RM10 million, I want to know what the details are, its particulars. Kindly obtain the details from the Ministry. I want to know what the plans and strategies of the Ministry are in future to prevent the problems of monkeys and wild boars that disturb the lives of these village people. Because what I was given in the Parliament of Masjid Tanah, the pig cages and monkey cages, are not sufficient. There are only 10. So, I hope the Ministry can help Members of Parliament who face this problem in terms of allocation, to prevent the monkey and wildlife problem. Thank you, Mr Chairman.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

by Haji Darus since 1975, and there has not yet been any mangrove swamp area there that has become a field due to the process of extracting this mangrove wood. I would also like to ask about the approval process by the Forestry Department for the mangrove wood extraction industry. Next, I would like to touch on Item 050100 and Item 07200 regarding pollution in the rivers. For the information of the Parliament of Masjid Tanah, pollution is occurring in the Linggi River, where there is far too much rubbish that hurts the eyes and hurts the heart. This is because we often go down to the river, as Masjid Tanah is promoting and also paying attention to eco-tourism. So, when many guests and tourists come from outside and they ride boats and see rubbish, especially when the water is receding, this gives a very unattractive picture and is offensive to the eye. So, I hope the Ministry can give attention to this matter. The same goes for the rubbish in the drains and so on. I would like to draw the attention of the Ministry to look at the initiative undertaken in Indonesia by young people named Pandawara Group, who have a great many followers. They began by cleaning rubbish from the drains and eventually they sparked a high spirit of volunteerism among Indonesian youth to clean rivers and drains, and this is a very good effect. I would like to ask whether the Ministry has a similar initiative to help NGOs, volunteer activities or activists, especially in pollution, in helping efforts to clean the environment. Next, I would like to touch on Item 060300 – Irrigation and Drainage, which concerns the Department of Irrigation and Drainage (JPS), the maintenance of major rivers and periodic drainage channels in the Parliament of Masjid Tanah. As happens with flash floods in low-lying areas such as Kampung Bukit Apit in Petron Masjid Tanah, Kampung Ramuan China Besar, as well as Paya Lebar and also Taboh Naning. My side was involved in the engagement sessions on the Flood Mitigation Plan 2.0, and I hope this matter can be carried out quickly so that the flood problem can be tackled in future. I also hope that JPS together with the Local Authorities (PBT) can also coordinate mandatory requirements relating to the construction of retention ponds for every housing estate, as well as upgrading the drains on main roads. Next, I would like to touch on Item 07100 regarding the PERHILITAN monkey problem. Mr Chairman, the monkey problem is very critical in my Parliament. These monkeys cause a great deal of damage to crops, destroy property, including entering people's houses and pulling out all sorts of household equipment, and household property is destroyed. I hope that with the addition of RM10 million, I want to know what the details are, its particulars. Kindly obtain the details from the Ministry. I want to know what the plans and strategies of the Ministry are in future to prevent the problems of monkeys and wild boars that disturb the lives of these village people. Because what I was given in the Parliament of Masjid Tanah, the pig cages and monkey cages, are not sufficient. There are only 10. So, I hope the Ministry can help Members of Parliament who face this problem in terms of allocation, to prevent the monkey and wildlife problem. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Masjid Tanah. Honourable Members, the House will resume sitting as the Committee of the Whole House. [The Committee of the Whole House resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presided over the sitting]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the sitting is adjourned and will resume at 2.30 p.m. Thank you.

[The sitting was adjourned at 1.04 p.m.]

[The sitting resumed at 2.30 p.m.]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

[Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) presiding

Mr Chairman (Dato’ Ramli bin Dato' Mohd Nor)EN

Honourable Member, I would like to inform you that the Honourable Raub has official duties outside, so we will proceed directly to the Honourable Saratok. Continue the debate.

Datuk Ali anak BijuBERSATU · PNSaratokEN

Thank you, Mr Chairman, for giving me the opportunity to debate at the Committee stage this afternoon. First, I would like to put forward Item 02801 – Project for the Marking, Measurement and Maintenance of International Boundaries. I would like to raise issues of international land boundary mapping involving Sabah, Sarawak with Brunei and with Indonesia's Kalimantan. Sarawak and Sabah have very long land boundaries with neighbouring countries, namely Brunei and Kalimantan, Indonesia. There are several locations along these land boundaries that are overlapping and still disputed. Therefore, I would like to request details on the status of the measurement of international land boundaries between Sarawak, Brunei, Sabah and Kalimantan. What are the issues on the ground that are causing delay or are obstacles to the mapping process? Is the neighbouring country giving satisfactory cooperation? How many overlapping boundary claims are still unresolved between Sarawak, Sabah and Brunei, and between Sarawak, Sabah and Kalimantan? When is the marking and measurement expected to be fully completed? Second, Item 040200 – Sustainable Energy Development. I would like to ask the Ministry about the latest developments in the planning and development of renewable energy (TBB) in Peninsular Malaysia. What is the actual status of the current renewable energy production capacity in Peninsular Malaysia? What is the demand for the supply of renewable energy, especially from industries based on the green concept, with permission. What steps have been taken to meet the demand for renewable energy from these green industries? I would also like to ask about the status of the ban on selling renewable energy to Singapore. Is the government still maintaining the policy of prohibiting the sale of renewable energy to Singapore, as practised by the previous government? What about the position of Sarawak, which has a lot of renewable energy production capacity through hydro sources? Is the prohibition on exporting renewable energy to Singapore applied? It has been informed that Sarawak has its own authority to regulate the supply of electrical energy. Sarawak does have a long-term plan to sell renewable energy to other places beyond what is consumed in Sarawak itself. Item 070600 – Biodiversity Protection and Patrolling Programme (BP3). I am aware of and welcome the government's efforts to protect and preserve the natural heritage of Malaysia by increasing the allocation from RM27 million in 2022 to RM39.3 million in 2023.

Datuk Ali anak BijuBERSATU · PNSaratokEN

Therefore, I would like to request details of the programmes, activities or additional efforts involving that additional allocation. I also call for the BP3 Programme to be expanded to Sabah and Sarawak, although forest jurisdiction falls under the respective state jurisdictions. Many former soldiers, police and indigenous people in Sarawak could become rangers to protect biodiversity in our country. Fourth, Item 29000 – Sarawak Water Supply Plan. I am disappointed with the reduction in the allocation given by the Federal Government to Sarawak compared with the allocation of 2022. Where in 2022, RM153.73 million was allocated and only RM140.79 million was allocated in 2023. A reduction of RM12.94 million. Whereas Sarawak needs RM2.16 billion to ensure that all Sarawak residents receive adequate water supply.

May I interject briefly, Honourable Member? Can the Honourable Member allow me to interject briefly?

Datuk Ali anak BijuBERSATU · PNSaratokEN

Yes, yes, please go ahead.

Thank you, Honourable Saratok. Thank you, Mr Chairman. Is the Honourable Member aware that the RM160 million given to Sarawak is not in the form of a grant, it is only in the form of a loan. In other words, the Sarawak Government must repay that allocation. Does the Honourable Member agree that if this allocation should be made in the form of a grant and not in the form of a loan?

Datuk Ali anak BijuBERSATU · PNSaratokEN

Thank you. I strongly agree if it is changed to a grant, because water is a basic necessity of the people of this Malaysia. Thank you. Does the government have a long-term programme to ensure that this 100 per cent target is achieved? However, I would like to request an explanation of the list of projects and locations included in that allocation. It is better to describe it as a loan, yes. Does this involve new projects or the extension of existing projects? That is all for my debate this time. Thank you.

Mr Chairman (Dato’ Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Saratok. I invite the Honourable Tampin.

Bismillahi Rahmani Rahim. Thank you, Mr Chairman, for allowing me to take part in the debate on the 2023 Budget at the Committee stage for the Ministry of Natural Resources, Environment and Climate Change. Firstly, Mr Chairman, I would like to touch on Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. Hopefully the allocation of RM1 billion this year can protect more Malaysians from continuing to fall victim to floods. Likewise with agricultural areas and agro-food. Therefore, Mr Chairman, I would like to ask how many flood mitigation projects will be involved under this year's allocation, together with their areas. Following continuous rain in states in the Peninsula including the West and central Sarawak as well as eastern Sabah until 1 March, as forecast by the Malaysian Meteorological Department, the Tampin area was also submerged in water and affected several areas, with a total of 266 victims recorded.

For the information of the House, the flood situation in Tampin is also getting more worrying. This situation has raised questions about the effectiveness of existing flood mitigation

in the Tampin Parliamentary constituency, namely in Pekan Gemas, whether it can still operate well or otherwise. Accordingly, I also urge the Ministry to examine this matter and, if there is a need to build new flood mitigation projects, I would very much welcome it, especially in Pekan Gemencheh, which can be implemented urgently. Next, Mr Chairman, I would like to touch on Item 80000 – National Sewerage Project. I note that this year's allocation has been reduced to only RM328,500,000 compared with RM431,502,136 in 2022. My question is, why has this allocation been reduced and in which areas will the allocation this year be involved? For the information of the House, the sewerage system project in Tampin town has long failed to be completed. Therefore, I would like to know what the latest progress is and when the realistic expected completion date of the project can be fully completed? The project that has been stalled for a long time has disrupted traffic, marred the scenery and reduced the happiness of us in Tampin. I very much hope that this matter receives the attention of the Ministry and is not allowed to continue dragging on. Next, Item 13900 – Flood Control and Flood Warning System. I thank the government for increasing the allocation to RM93,182,400 compared with RM45,459,417 in 2022. This major increase clearly shows the government's seriousness in remedying the weaknesses of the flood warning system. I am of the view that the Ministry should also place emphasis on the basic survival knowledge of the people for facing the calamity of floods. Therefore, I propose that the Ministry implement a community-based disaster risk management programme in cooperation with Members of Parliament and State Assemblymen. Through this effort, we can raise the level of readiness of the people and prepare them to face disasters in future and reduce the risk of loss of life. Accordingly, I hope that part of the total allocation is also spent for this purpose to guarantee the safety of the people. Finally, Mr Chairman, I would like to touch on Item 07100 – Department of Wildlife and National Parks (PERHILITAN). Based on the Wildlife Conservation Act, wild boars, macaques, monkeys and langurs are among the animals that are protected. This means that any individual who shoots, snares or kills these animals commits an offence. Therefore, Mr Chairman, I would like to obtain an explanation: what is the Ministry's plan to control these wild animals so that they stop continuing to disturb and damage crops in rural areas? On this occasion, I also propose that the Ministry spend part of the allocation totalling RM43,383,400 this year to solve this problem by controlling the breeding of these animals. In my opinion, while we place importance on protecting wildlife, the Ministry also needs to show consideration for the fate of rural residents who are often threatened. That is all from me for now, Mr Chairman. I hope that all the views and questions raised receive the attention of the Ministry for further action. Thank you, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Tampin. I invite the Honourable Kuala Langat.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

Thank you, Mr Chairman, for giving me the space to also debate at the Committee stage.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

Firstly, I refer directly to page 247, Item 060000 – Water and Sewerage Management, under Item 060300 – Irrigation and Drainage, Code 10000 to Code 40000, with an estimated allocation of RM115,003,800. Lately, with the frequent erratic climate conditions that cause floods, I think one example in Selangor was when we faced floods at the end of 2021. Many activities and flood-mitigation works must be handled urgently at the district level and require directives and action as quickly as possible. It involves not only financial matters but also the management of implementation activities. I find that there seems to be some obstacle where the organisational management of the district-level Department of Irrigation and Drainage (JPS), where the management is still at the state-level JPS. As we are well aware, especially if I mention Selangor, the district-level JPS is, organisationally, managed at the state level. So, although the positions are at the district level, in terms of implementation, whatever planning and activities are to be carried out, it takes time, including small projects and so on, because it also involves insufficient positions. I propose that the management of district-level JPS should be placed under the district engineer and organised like other departments, such as the Public Works Department, which is also at the district level, and where financial management is all handled at the district office. This is different from the Department of Irrigation and Drainage. Next, I refer to page 252, Item 08601 – Planting of Mangrove Trees and Suitable Species on the Coastline, under the Forestry Department Peninsular Malaysia (JPSM), where I believe the 100 Million Trees Planting Campaign will also involve mangrove trees, especially in our mangrove forests. I see that the estimate for 2023 is RM972,000 lower when compared with the actual expenditure in 2021, amounting to RM8,294,697. I think a large allocation should also be given for tree-planting activities, especially mangrove forest trees, which are a very important matter in protecting our coastlines. Regarding mangroves, as we know, mangrove forests act as wave breakers and can reduce the occurrence of erosion and so on, and consequently reduce the risk of floods, coastal erosion and also river erosion. Next, I refer to page 253, the Department of Irrigation and Drainage. Item 13200 to Item 16900. Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation; Item 15000 – JPS Minor Works, Various States; Item 15100 – Prevention of Coastal Erosion; Item 15300 – Dredging of River Mouths; Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, especially in Kuala Langat; and also Item 15200 – Improving, Beautifying, Cleaning and Treating River Water and MASMA Infrastructure. So, among the several issues I see with this excessive climate pattern is that coastal and riverbank erosion is occurring, and many have collapsed. Many embankments have eroded, especially in Kuala Langat. I see that some main roads, sometimes including this road, have been eroded. For example, in Kuala Langat, the Pantai Morib to Kelanang route collapsed due to erosion. Likewise, privately owned land has also collapsed, and some of it has become part of the river today due to erosion, and there are also cases where privately owned land is now outside the embankment and has become mangrove forest. Will the government take back, or direct the state government to take back, these lands to be made into areas for mitigation or wave breakers so that the mangrove forests can be preserved?

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

Next, regarding river pollution, which I wish to mention here specifically, the Langat River, which is the source for the Labohan Dagang Water Treatment Plant, where I see that there is a lot of development in Bandar Mahkota in particular. There is much development that uses a lot of river water. They use this river water for their industrial processes, including paper recycling factories and so on. Eventually they discharge that water back into the river. Although they give assurance that the water discharged is cleaner than the water taken, it turns out that when deaths of species occur in this river, it shows that pollution has taken place. I want to know what guarantees or allocations the government has to look at how to implement an integrated water treatment plant.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

There, I recall there are various industrial factories here; if it can be done in an integrated manner. Eventually, it is properly treated before it is released into the river. So, that is all I have to say. Thank you, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Kuala Langat. I invite the Honourable Member for Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Mr Chairman. I will go straight to Item P.16700 – Flood Mitigation Plan (RTB) and Urban Drainage. I would like to seek clarification or details from the ministry regarding the RM1 billion budget allocated. Will it also be allocated to the Tebrau area, which was recently flooded in Johor, a major crisis including Kampung Paya Kenangan, Kampung Bunga Ros, Kampung Melayu Kangkar Tebrau, Kampung Pasir Tebrau, Kampung Ulu Pandan, Kampung Tengah, Sungai Tiram, the Batu 20 area, Kampung Cahaya Baru, Kampung Tawakal, Kampung Maju Jaya and Kampung Sinaran? I also hope that JPS can carry out works to deepen, dredge or maintain the two main rivers that cause the floods, namely Sungai Tebrau and Sungai Tiram. Let us pray that the Johor floods will not recur. The second issue is under Item P.06400 – Johor State Water Supply Plan, where RM84 million has been allocated. Mr Chairman, water consumption, especially in southern Johor, is indeed high. It requires nearly 1,000 million litres a day, or 1,000 MLD a day. In fact, the reserve margin in southern Johor has already turned negative. We really do not have enough water. So I request that, within this RM84 million budget, how much will be channelled for water supply? Does it include the progress of the Layang 2 Raw Water Supply Project? Please provide clarification on what other projects are included in this RM84 million that can add to and strengthen the water supply, especially in southern Johor. Mr Chairman, the issue of non-revenue water (NRW). Non-revenue water (NRW) is clean water resources that cannot reach consumers or, in short, is wastage. The causes include water being stolen without passing through a water meter, pipe leakages and others. According to a study recently carried out by the government, in 2022 alone the total loss for NRW was almost RM2 billion. The national average percentage of non-revenue water in 2022 was 37.2 per cent, equivalent to a quantity of 7 million litres a day. For information, the recommendation set by the World Bank is that the average percentage should be less than 25 per cent. If we look at the breakdown by state, the top three states with the highest NRW in Peninsular Malaysia are Perlis, Kelantan and Kedah. All of these are coincidentally under Perikatan Nasional. So, I hope the state governments

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

of these three states can cooperate with the Federal Government to reduce this NRW. Unfortunately, the national average percentage has increased from 35.3 per cent in 2017 to 37.2 per cent in 2022, an increase of 1.9 per cent or equivalent to 1.1 million litres a day. This clearly shows that the measures taken so far are not effective or efficient. So, with an allocation of RM325 million this year, can the government provide details of what projects will be used to reduce NRW? What is the government's plan to reduce the national average NRW percentage to 25 per cent, which is the figure recommended by the World Bank? Mr Chairman, there is also an issue concerning Indah Water. I have received complaints from the public that Indah Water is using the services of a third-party company, or what we call a debt collector, to try to collect fees. I feel that this is not a proper step, firstly, because it involves data leakage. That is, this information is given to a third party. Secondly, it is a waste in my view because the amount claimed is only RM100. Why engage a third party? Thirdly, I feel that as a government-linked company (GLC), they can collect the money themselves or use lawyers. It is not good to use debt collectors. Who knows whether the debt collector uses methods that are not permitted to collect that money? It does not give a good image to Indah Water and also to the government. Finally, on the issue of renewable energy, I make a proposal to the ministry. In fact, we have many dams and water catchment areas. One of the renewable energy sources that we can obtain in Malaysia is actually solar power. My proposal is whether the ministry can consider placing solar panels on the water surface of dams and water catchment areas. It has two benefits. One, we can reduce the evaporation of water and, two, at the same time, we can extract clean energy to obtain energy that can be used again. Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Tebrau. I invite the Honourable Member for Tangga Batu.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

Thank you, Mr Chairman. I extend a warm welcome to the PAS Tangga Batu Muslimat Wing, which has given its support to me. Mr Chairman, I would like to bring up issues that have occurred in Tangga Batu directly. Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation, on page 254. The Federal Government has approved eight projects worth RM931.2 million to overcome the flood problems that frequently hit Melaka. The eight projects are the Melaka River Flood Mitigation Plan Phase 1, upgrading of the Krubong Flood Retention Pond, RTB Sungai Duyong, RTB Alor Gajah, RTB Merlimau and so on. However, I want to focus on Tangga Batu, namely the Krubong Flood Mitigation, because it involves Kampung Lanjut Manis, Kampung Krubong, Tanah Merah, Belimbing Dalam, although these are within the Alor Gajah Parliamentary constituency, and also a religious school, namely Al Munawwarah. So, the flooding here is not seasonal flooding but occurs whenever there is heavy rain. So, my question is, I would like to ask the ministry for an explanation on the status of upgrading this flood mitigation project. If we look at the allocation under this item, it is high at RM117 million. I hope that this project can receive attention from the ministry. Second, Item 15000 – JPS Minor Works, Various States. Although I see that its allocation has been reduced to only RM76 million, if we look at

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

that within the Tangga Batu Parliament there are 717 hectares of paddy fields, where we often receive complaints of a shortage of water supply. Therefore, I ask that the ministry give attention to this, because these paddy fields are a source of our food. The third is the issue of Item 080000 – New Policy, Item 08601 – Planting of Mangrove Trees and Suitable Species on the Coastline (JPSM). Recently, on 12 November 2022, an incident occurred where the trees planted at Pantai Puteri fell, resulting in deaths. Therefore, the MBMB has taken action, namely pruning the trees along 2.5 kilometres of the beach, and eventually this beach has become bare and fewer people come to the beach. Although I was informed that there is a project to be carried out by MBMB, namely to plant hibiscus tiliaceus, or commonly known as bunga raya laut, I ask that the ministry provide support, whether in the form of an allocation, so that this project can be implemented as quickly as possible so that Pantai Puteri can once again become a place that is visited, top five in the State of Melaka. Then Item 15100 – Prevention of Coastal Erosion. I have spoken that Kem Terendak today is very nostalgic. It was built during the British era, and today the problem is coastal erosion. It is not only happening at Tanjung Kling, Pantai Puteri, Pantai Kundur and so on, but also involves what we call the beach at Kem Terendak, which threatens the development of the armed forces hospital. So, we ask that the government give greater focus, because I see its allocation is also high at RM177 million. I hope attention can be given to the State of Melaka. We know that this project is also caused by beach reclamation and so on, and even changes in sea currents and so on. Eventually, very high erosion has occurred. Next, referring to Item 050100 – Environment. I would like to ask the ministry, does the ministry intend to limit EIA studies for a project, especially mega projects? I see that some projects apply for EIA reports for the third time, as if they want the Department of Environment (JAS) and the EIA panel to follow the wishes of the project, whereas the proposed project should be the one that meets the requirements or the findings of the EIA.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

I am of the view that we should place a limit on the preparation of these EIA reports. If a project fails to pass EIA approval after the second EIA study, then the project should be cancelled. Next, under Item 020000 – Geology and Land Management. We request the Honourable Minister to state the total reserve land and its percentage for each state for the year 2022. If possible, please provide the answer in writing. Thank you.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, the Honourable Member for Tangga Batu. I invite the Honourable Member for Baram.

Dato Anyi NgauPDP · GPSBaramEN

Thank you, Mr Chairman. I will go straight to Item 15300 – Dredging of River Mouths and also Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. Mr Chairman, the Baram Parliamentary constituency is an area that is often hit by floods. Every year, or within one year, we may have two or three flood incidents involving certain areas, and among the areas or longhouses that are frequently hit by floods are Long Bemang, Long Wat, Long Linai, Kuala

Dato Anyi NgauPDP · GPSBaramEN

Tutoh, Rumah Norah, Rumah Ajan, Long Ikang, Long Banyak, Rumah George and many others, including Long Panai. Every year we often face floods, and I believe the public also knows that the cause is that our climate has changed. Another reason is the activities in the interior areas. So, the Baram River has become shallow. Therefore, the river water floods us. Because of this, I believe JPS has indeed already carried out a study regarding this Baram River. I ask that the ministry address these flood problems by dredging the Baram River, Kuala Baram, Kuala Sungai Tinjang, Kuala Sungai Tutoh and also Kuala Sungai Apoh, because these are the areas downstream of the Baram that are always hit by floods. Hopefully this year, with an allocation totalling more than RM1 billion, the areas I have mentioned can be considered to overcome the flood problems in the Baram area. In addition, Mr Chairman, I would also like to propose and request that the ministry carry out a study. Because of the activities in the interior, the Baram River has become shallow. Conduct a study so that it can be dredged, so that it will smooth and further facilitate the flow of the Baram River to the sea.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

Honourable Member for Baram, may I interject, Honourable Member for Baram. Pasir Salak.

Dato Anyi NgauPDP · GPSBaramEN

Oh, yes. Yes. Half a minute.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

Yes. Honourable Member for Baram, do you agree with Pasir Salak that the Ministry of Natural Resources, Environment and Climate Change should establish a Climate Change Department to overcome the problems mentioned by the Honourable Member for Baram just now? Thank you.

Dato Anyi NgauPDP · GPSBaramEN

I agree, because at the state level, I believe in the State of Sarawak, the state government already wants to have an initiative like this. So, next, regarding the erosion of riverbanks, which has caused the safety of these longhouses to be compromised, I ask that JPS study and approve the construction of a river retention wall, with your permission. This is because, in my area in Baram, there are several villages and longhouses such as Long Bemang, Long Wat, Kuala Tutoh, Benawa and downstream in Baram, where the sites of their longhouses or villages have already been affected by riverbank erosion. Hopefully, the matters I have mentioned will be implemented this year as well. Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Baram. I invite the Honourable Member for Kuala Nerus.

Dato’ Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace. Thank you, Mr Chairman. I wish to refer to Item 060300 – Water Supply and Drainage (Pengairan dan Saliran), page 247. On this issue, I wish to touch on two matters. Firstly, regarding the National River Trail (Denai Sungai Kebangsaan) (DSK), which targets the construction of 10,000 kilometres of trails across the country by 2030, and the flood mitigation programme in the Kuala Nerus District, which I mentioned earlier but for which I have not yet received a clear commitment. So, I understand that the construction of river trails throughout the country aims to preserve the beauty of rivers, and at the same time to protect rivers from risks and from pollution by irresponsible parties. Jadi, the presence of the public along river areas will prevent irresponsible parties from using the river as a place to dump rubbish, and in addition it has the potential to contribute to local eco-tourism.

Dato’ Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

I seek an explanation from the ministry regarding the allocation for these river trails. In the budget, under which item is it placed? This is because, according to my study of this Madani Budget (Belanjawan Madani), there is no specific allocation for the continuation of this programme. Yet under the previous government, the Honourable Minister had mentioned and targeted the construction of 1,000 kilometres of river trails each year. Therefore, I seek the ministry's details: how much is allocated for the construction of river trails in the Madani Budget this year? Within that 1,000-kilometre target, does it also cover rivers in the Kuala Nerus District, namely the Sungai Terengganu and the Sungai Nerus themselves, in the ministry's plans? I seek the details from the Honourable Minister. Secondly, we have raised floods many times. I wish once again to go to my constituency in Kuala Nerus, regarding the Tepoh Banggol Air Lilih Flood Mitigation Project, which has been proposed and applied for since 2013, involving several residential areas that can be said to be submerged by water every year. Much of the people's property is damaged, belongings are lost, and so on. I have raised this RBT programme before in my earlier debate. However, I once again wish to obtain a definitive answer from the Honourable Minister on whether this project will be expedited? Considering that it had in fact been approved by the former Prime Minister from PN, the PN Government, on 4 March 2022. I seek the Honourable Minister's explanation. Next, I move to Item 050000 – Environmental Management and Climate Change, page 246. In the details of the Madani Budget, there is no specific allocation for climate change. Yet climate change has a very large impact on the people and the nation. Under this Item 050000, only environmental management and climate change are mentioned, with an increase in allocation of approximately RM3 million compared with Budget 2022. Therefore, I seek the relevant ministry's details on this climate change matter. To what extent is the government's commitment in addressing the various risks and challenges of climate change occurring at the global level, in which Malaysia is not exempt? Therefore, I also wish to support and seek an explanation from the Honourable Minister: to what extent is the government's commitment to establishing a Climate Change Department to ensure our country can face these challenges with better preparation?

Dato’ Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

Finally, under Item 050300 – Biosafety (Biokeselamatan), page 247. I wish to touch on the Environmental Crime Prevention Unit (Unit Cegah Jenayah Alam Sekitar), which was previously established by KASA in cooperation with the Ministry of Home Affairs to curb environmental pollution activities that are increasingly rampant. However, the constraint faced by this unit at present is a shortage of staff and Royal Malaysia Police (PDRM) officers to conduct any investigations into pollution cases and so on. For the information of Mr Chairman, PDRM has forensic officers who enable the investigation and arrest of environmental criminals to be detected and apprehended more quickly. Therefore, I seek the ministry's explanation: to what extent is the government's commitment to strengthening this Environmental Crime Prevention Unit by increasing the number of PDRM officers, so as to prevent environmental criminals from continuing to rampantly carry out irresponsible activities caused by weaknesses in enforcement on the part of the government itself? That is all, thank you, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Kuala Nerus. The floor is given to the Honourable Member for Muar.

Thank you, Mr Chairman. I wish to focus only on one item, namely Item 00117 – The Green Energy Issue or renewable energy. For us to build a Malaysia that is resilient for the future, this issue is not a small issue, nor is it a side issue. The ministry of the Honourable Minister is the ministry that will determine the survival of the nation and our industries. Therefore, I wish to focus on this issue in depth, because this ministry does not merely look at natural disasters or the issue of Malaysia becoming a peaceful and green nation alone. However, in the next 10 years, it is the green energy industry that will determine whether the country can attract high-impact investment and high-paying jobs, which will have a major impact on our national economy. Why do I say this? If we look today, there is a lot of high-impact investment. For example, data centers that enter Malaysia set a prerequisite where electricity must be powered by renewable energy or green energy. We see the E&E industry, which is growing rapidly in Malaysia, also setting a prerequisite that our country must be a producer of green energy. This also proves that future manufacturing sectors and industries will expect that electricity in Malaysia comes from renewable energy. We also see major banks, whether inside Malaysia or outside Malaysia, offering lower interest rates if companies or manufacturing sectors comply with ESG or their electricity comes from green energy as well. This means that our country's economic situation is given a positive or negative impact by the functions of the Honourable Minister's ministry. Therefore, I wish to raise two very major problems here. Although the ministry has set a target for 2035 that 40 per cent of our energy sector be dominated by RE, we have only reached 23 per cent now. But what I would advise the Honourable Minister is: do not look at that 23 per cent. If we break down that 23 per cent and exclude the largest players, for example Bakun Dam, all the biggest dams, the reality is that the total is below 10 per cent, which is very, very small. Why has this happened? There are two problems I wish to raise. Firstly, the problem of climate financing, which is very unfriendly. I think the Honourable Minister also knows. If we look now, for people to invest in the green energy industry, the cost is very high because they must protect the environment well. For example, in the hydro industry, to install an intake station, turbines, powerhouse, all the way until connected to TNB, they must build from A to Z. This means the private sector will bear the full cost. Whereas, if we look at many other developed countries, their TNB builds all of this, completely. However, we see that TNB invests a lot overseas, and in the end, the private sector must take up this huge bill. However, profit negotiations, I think the Honourable Minister also knows, come through feed-in tariffs or power purchase agreements discussed through SEDA, which go through an open bidding system. Open bidding is generally a good thing, but the problem is this: many apply, many win, but they bid very low, and in the end they cannot implement at all. Therefore, I hope the Honourable Minister can share. For example, when the ministry sets an example of 50 megawatts, given to the RE industry, how much is eventually completed? This is because the reality is that many cannot do it; they bid very low, it kills the industry. When they cannot implement it, in the end they sell the project to someone else, to take up the failure. This causes this industry to find it difficult to remain progressive. I hope this data can be shared. The second problem is because there is no economies of scale. I will give a simple example: if we look at the small hydro industry, I have some experience. The way of negotiation is that it cannot be done as a package, a collective package. For example, if we have 20 small rivers, we must negotiate one by one. What is the problem if we negotiate one by one? We cannot unlock the benefits of economies of scale. For example, when we negotiate one by one, we have to buy electricity and turbines one by one. The cost, when we negotiate with Germany or China, is much higher compared with if we can buy 20 or 30 from them, at one go the cost is lower. Secondly, to get a more competitive interest rate from banks, with respect, only 30 seconds. Mr Chairman, interest rates from banks are also much higher if we compare them with when we can achieve economies of scale. Thirdly, if we want to bring factories, for example turbines, to be placed in Malaysia, if we are only able to buy one or two, what is the point of them having technology transfer? What is the point of them wanting to bring their factories here? In the end, we will always have to import, there is no technology transfer, no progression, and in the end, we remain a small player. Therefore, I hope these two matters will be considered by the Honourable Minister, seriously looked at, to ensure that our green energy industry continues to grow and, in the end, its benefits are felt by everyone in Malaysia. Thank you, Mr Chairman.

the manner of negotiation: it cannot be done as a package, a collective package. For example, if we have 20 small rivers, we must negotiate one by one. What is the problem if we negotiate one by one? We cannot unlock the benefits of economies of scale. For example, when we negotiate one by one, we have to buy electricity and turbines one by one. The cost, when we negotiate with Germany or China, is much higher compared with if we can buy 20 or 30 from them, at one go the cost is lower. Secondly, to get a more competitive interest rate from banks, with respect, only 30 seconds. Mr Chairman, interest rates from banks are also much higher if we compare them with when we can achieve economies of scale. Thirdly, if we want to bring factories, for example turbines, to be placed in Malaysia, if we are only able to buy one or two, what is the point of them having technology transfer? What is the point of them wanting to bring their factories here? In the end, we will always have to import, there is no technology transfer, no progression, and in the end, we remain a small player. Therefore, I hope these two matters will be considered by the Honourable Minister, seriously looked at, to ensure that our green energy industry continues to grow and, in the end, its benefits are felt by everyone in Malaysia. Thank you, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Muar. The floor is given to the Honourable Member for Tuaran.

Thank you, Mr Chairman, for giving Tuaran the opportunity to also debate the Budget 2023 at the Committee stage for the Ministry of Natural Resources, Environment and Climate Change (KASA). Tuaran begins the debate on Development Purpose 23, Item 28000 – Sabah Water Supply Scheme. For this purpose, a total of RM159,958,000 is allocated in the form of a loan. Likewise for Sarawak, only a loan is given, amounting to RM140,792,300, and there is no grant. Instead, all states except Terengganu have been allocated in the form of grants, namely RM8.4 million for Johor, RM102 million as a grant and RM45 million as a loan for Kedah, RM53 million as a grant for Melaka, RM8 million as a grant and more than RM2 million as a loan for Kelantan, RM22 million as a grant for Negeri Sembilan, more than RM20 million as a grant and RM25 million as a loan for Pahang, RM450,000 for Perak, RM8 million in the form of a loan for Terengganu, more than RM38 million in the form of a grant for Labuan, and RM129,200 in the form of a grant and RM18 million in the form of a loan for Perlis. Tuaran wishes to ask: what are the criteria used to consider whether a territory or state should be allocated in the form of a grant or in the form of a loan in terms of water supply planning? Tuaran also wishes to ask: why is this loan allocation listed as Federal development allocation when, once borrowed by the state, the money already becomes the right and money of the state and will be repaid by the state? It should not be included in the development estimates for the Federation; it should be the state's. Tuaran also wishes to know, apart from providing financial loans to the Sabah Government, what other role does the Federal Government have in developing clean water supply, particularly in overcoming problems such as procurement, buying tanker lorries to deliver water where water supply is cut off, upgrading dilapidated piping, building or upgrading booster pumps, reducing non-revenue water (NRW) and so on?

In this regard, Tuaran wishes to ask what projects will be implemented with the loan of RM159,958,000? Mr Chairman, water is very important. Imagine the situation if the water supply is cut off and there is a death or a need to hold a funeral feast. In fact, this is what is happening in the Tuaran Parliamentary constituency at this time. More than 100 villages and housing estates are affected by the water supply cut-off. I hope the Federal Government plays a more proactive role in helping the Sabah State Government overcome the various clean water supply problems in Sabah that have been problematic for a long time. I am aware that water matters are listed in the State List in the Federal Constitution. However, if the Federal Government can give allocations directly to states in Peninsular Malaysia, there is no reason why grant allocations cannot be given to the territories of Sabah and Sarawak. Next, I debate Item 08600 – Peninsular Malaysia Forestry Department (Jabatan Perhutanan Semenanjung Malaysia) (JPSM). I commend the Ministry of Natural Resources, Environment and Climate Change because the Federal Government department that operates only in Peninsular Malaysia has been correctly rebranded and named as the Peninsular Malaysia Forestry Department. This is correct. This is because it operates only in the Peninsula, unlike the Ministry of Agriculture and Food Security. Departments such as the Department of Agriculture, the Department of Veterinary Services and the Department of Fisheries have been branded as Malaysia, whereas all three of these departments operate only in the Peninsula. Mr Chairman, perhaps you will agree with Tuaran that the three departments I mentioned earlier should be rebranded to reflect the areas in which they operate. So, simply name the Federal Department of Agriculture as the Peninsular Malaysia Department of Agriculture. Next, the Department of Veterinary Services Peninsular and the Department of Fisheries as the Peninsular Malaysia Department of Fisheries only, because it operates there only and the allocation used is only for the Peninsula; in Sabah it is different, in Sarawak it is different, and so on. Next, this is the last one, Mr Chairman, Item 060300 – Water Supply and Drainage (Pengairan dan Saliran). In this regard, I ask the Federal Government to ensure that allocations are made to build drainage in Giling Laut, Tuaran. This is very important to ensure that the flood problem there can be addressed, especially at a time when the Pan Borneo project that passes through this place is worsening the flood situation there. Every time it rains for not more than one hour or so, it floods, because the Pan Borneo project causes flooding and much property is damaged and so on, and the allocation to build drains in the Giling Laut area has been delayed many times. At the same time, I also ask that the ministry approve the application from the Sabah Drainage and Irrigation Department because there is no flood study for the entire Tuaran Parliamentary constituency. That is all, and thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Tuaran. The floor is given to the Honourable Member for Raub, the last debater.

Tuan Chow Yu HuiDAP · PHRaubEN

Thank you, Mr Chairman. I also debate the budget at the Committee stage under Development Purpose P.23 of the Ministry of Natural Resources, Environment and Climate Change, Item 22000 – Pahang State Water Supply Scheme on page 251 for the reference of Mr Chairman. Mr Chairman, the Federal Government has allocated RM45,520,000 for the Pahang Water Supply Scheme. The question is, how does Pengurusan Air Pahang Berhad (PAIP) utilise that allocation? How does PAIP

Tuan Chow Yu HuiDAP · PHRaubEN

...determine which projects should be given priority? Will areas experiencing serious water supply disruptions be given main attention in upgrading and maintaining water infrastructure? Mr Chairman, the Ministry disclosed that the frequency of water disruptions in Raub reached 150 times in 2020, and 123 times and 116 times in 2021 and 2022 respectively. In other words, the people of Raub experience water disruptions every three days on average. According to PAIP, the Sungai Bilut Plant, which is the main plant, stopped operating 82 times a year in 2017. Water supply disruptions in Raub occur frequently, several times a month, and can last up to seven days each time. During the Chinese New Year celebrations, the people of Raub were deeply disappointed because the water disruption lasted from Chinese New Year's Eve until the third day of Chinese New Year, four of the most important days in the Chinese community's celebrations. The crisis affected 9,000 housing units in Raub. The water supply disruption not only affects the daily lives of local residents but also disrupts the operations of public facilities and has a negative impact on the local economy. I hope this problem can be resolved as quickly as possible to prevent a similar situation from recurring during Hari Raya Aidilfitri in April. Mr Chairman, in 2017 the Federal Government introduced the Sabo dam project. In 2019, the Federal Government channelled RM3 million to upgrade infrastructure such as the installation of booster pumps and storage tanks. Regrettably, the allocation was not fully spent due to the change of government as a result of the Langkah Sheraton. Nevertheless, these projects do not cover all critical areas. The people of Raub are still fundamentally haunted by the problem of water disruptions. Mr Chairman, the Federal Government also demonstrates its dedication to ensuring water security through the Water Sector Transformation 2040. Water security is viewed as a national security matter. The National Security Council, through the National Security Policy 2021-2025, has included water security as an important element. In this context, water disruption is considered a national threat, apart from militant threats and others. Mr Chairman, among the challenges to the transformation of the water sector towards 2040, as found in the same study, are ageing water infrastructure that is no longer sufficient and unsustainable, and less resilient in supporting the growth of towns and cities. This finding is also consistent with PAIP's view that water disruption in Raub is caused by plant capacity that cannot cope with population growth, the inability to treat turbidity in raw water, the frequency of pipe bursts, and consumer pipes that are too far from the plant and undersized. PAIP also explained in detail that RM2 million is needed to upgrade the clean water pumps at the Raub District Water Treatment Plant. Therefore, Mr Chairman, I propose the following. The Federal Government should allocate part of the 2023 estimate as an emergency fund, to be used to complete water supply system projects affected by critical water disruption crises such as in Raub. The Federal Government needs to allocate funds to build booster pumps and storage tanks in housing estates or villages located at high elevations and with high demand, to ensure a consistent water supply across the district. The Federal and state governments should also be transparent in announcing the roadmap for upgrading the water management system. The Federal Government has a responsibility to ensure sustainable water access and to play a role in monitoring the progress of projects. Contractors who fail to comply with tender conditions and the stipulated timelines must be subject to firm action. Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. A total of 20 Honourable Members have debated for the Ministry

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

of Natural Resources, Environment and Climate Change. Now is the time for the Minister to reply. Time allocated: 20 minutes.

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources, Environment and Climate Change · SetiawangsaEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of peace, Mr Chairman, and all Honourable Members whom I respect. The Ministry would like to record its appreciation and thanks to the 20 Honourable Members who debated issues under the Ministry of Natural Resources, Environment and Climate Change (NRECC) during the committee stage of the Appropriation Bill 2023 today. Firstly, for the Honourable Member for Mersing...

Mersing.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

The Honourable Member for Mersing, yes. The Honourable Member for Mersing raised the status of the Mersing Geopark, and the State Government of Johor has been studying the matter in order to bring the Mersing Geopark Consideration Paper to the Johor State Executive Council Meeting for endorsement. At the NRECC level, we have recognised the Mersing Geopark as a National Geopark in 2019. At the level of the Geopark Implementation Committee and the Department of Minerals and Geoscience (JMG), there is still interest in continuing this project by using geosites, biosites and culture for geotourism products, with the support and cooperation of stakeholders, communities and also the local authorities (PBT). To ensure the sustainability of geosites together with the JMG community, reskilling and upskilling programmes, basic and advanced courses for geopark guides, were held last year with 30 participants. The Honourable Member for Gopeng raised the efforts to maintain the Lenggong Geopark and also the Lembah Kinta. For the Lenggong Geopark, a total of RM4 million has been allocated for the conservation and preservation of the nation's natural resources for a period of three years, from 2021 to 2023. This includes mapping, characterisation and rating in terms of aesthetic and cultural aspects as well as recreational value, awareness programmes and also education. As for the Lembah Kinta Geopark, the development and maintenance plan for the Lembah Kinta Geopark, and other geoparks, falls under the jurisdiction of the state government. For the information of the Honourable Member, the Lembah Kinta Geopark has been placed under the management of Perbadanan Taman Negeri Perak, a statutory body under the Perak State Government. Next, the Honourable Member for Kemaman raised the holistic mitigation and equipment in facing debris flood and also the issue of an early warning system. The JMG is committed to efforts to reduce the risk of geological disasters, debris flow and mitigation measures through efforts such as developing an early warning system or sistem amaran awal, and this system is intended to provide siren-type warnings to village residents to evacuate safely in the event of a geological disaster involving debris flow. The JMG has developed an early warning system with permission at Titi Hayun, Gunung Jerai in February 2022. Next, we also implement a community empowerment programme based on the Community-based Disaster Risk Management (CBDRM) concept in vulnerable communities living in geological disaster areas. Finally, carrying out a project to map hazard zones and control zones in areas vulnerable to geological debris flow disasters for community preparedness, beginning in 2023. Next, the Honourable Member for Saratok raised the matter of the measurement of the Malaysia-Brunei border, and to date the Department of Survey and Mapping Malaysia (JUPEM) has carried out marking and measurement work over a distance of 128.45 kilometres. At this time, both

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

countries, Malaysia and Brunei, are working to sign a memorandum of understanding to accept the results of the marking and measurement that have been completed. The remaining land border distance between the two countries is expected to be completed in the coming year. Next, as for the status of the international boundary measurement between Malaysia and Indonesia, to date JUPEM has carried out marking and measurement work over a distance of 1,943 kilometres out of the total international land border distance of 2,063 kilometres between Malaysia and Indonesia. There are still areas that have not been finalised, with a distance of 119.9 kilometres, namely seven problematic areas, or outstanding problems, comprising three OBPs in the Sabah-North Kalimantan sector and four OBPs in the Sarawak-West Kalimantan sector. One area to the west of the Sebatik Island waters, 23 kilometres long, is now in the process of planning measurement and planning solutions for three OBPs in the Sabah-North Kalimantan sector in 2024. At present, both countries have shown good cooperation in negotiating, planning and resolving these boundary issues. The Honourable Member for Mersing asked about the Small Estates (Distribution) Bill 2021, which was passed in 2021. There is now a proposal to appoint 100 new officers to cope with the increase in small estate distribution cases, which the Public Service Department (JPA) has approved on a contract of service basis, with permission. These positions consist of 50 Administrative Officers N41 and 50 Administrative Assistants Grade N19. This has been implemented in cooperation with the Public Service Commission of Malaysia, and these officers have reported for duty at the Estate Distribution Units nationwide starting 3 January 2023. The Honourable Member for Parit Sulong on the role of mangroves. The planting programme for mangrove trees and suitable species along the coastline began on 7 February 2005 and is a long-term national programme for the conservation of affected coastal areas. As of 31 December 2022, an area of 3,278 hectares of coastal areas across the country has been planted with 7.2 million mangrove trees and suitable coastal species. For the information of Honourable Members, as was mentioned and raised earlier, planting mangrove trees along the coastline functions as a natural barrier against soil erosion, the impact of strong waves and strong winds. It is also a natural habitat for various species of flora and fauna. The Honourable Member for Mersing and the Honourable Member for Arau asked about the status of the achievements of the Malaysia Greening Programme through the 100 Million Tree Planting Campaign and the involvement of Members of Parliament. I think this programme is open in nature and can involve any Member of Parliament. We can coordinate with Yayasan Hijau, but for now, on record, we have planted 58.52 million trees. However, we want to review how effective it is, because what is registered today is when the trees are planted. What happens to those trees afterwards? Whether they are suitable for the habitat and so on, we have not yet been able to identify. So, we do not want this tree planting activity to become mere greenwashing without giving a truly effective impact on our environment. So we are in the process of reviewing how effective this programme is. The Honourable Member for Sri Gading? The Honourable Member for Masjid Tanah? The Honourable Member for Tangga Batu? Okay. The Honourable Member for Tangga Batu proposed the planting of saltwater marsh species at the Pantai Puteri area and requested assistance as well as support. The Ministry has taken note, and we will examine the suitability of planting trees in that area through the Melaka State Forestry Department (Jabatan Perhutanan Negeri Melaka). God willing, if it is suitable, we can provide support through the agencies under NRECC.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

A small correction. Not saltwater marsh; Hibiscus tiliaceus is bunga raya laut.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Oh, bunga raya laut. Sorry. This is the note that was given to me. Okay, we will study the suitability of that tree and, if necessary, we can provide support through the agencies under NRECC. Next, the Honourable Member for Mersing, the Honourable Member for Masjid Tanah and the Honourable Member for Tampin. Much has been said about human-animal conflict. As we know, this is a matter of trees, and the problem arises when their habitats are disturbed and human activities, whether for residential or commercial purposes, become increasingly close to the habitats of these wild animals. Therefore, conflict will certainly occur.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

We certainly give serious attention to this. We know there is much of it in the state of Johor, in the districts of Mersing and Kluang, and among the actions taken by the Department of Wildlife and National Parks (PERHILITAN) are patrols, monitoring and shoo-and-shoot operations in hotspot areas where elephant conflict occurs. Next, we have elephant capture operations: a total of 23 conflict elephants have been successfully captured and relocated from 2015 until 2021, recorded in the districts of Kluang and Mersing. We also hold public awareness programmes with dialogues and discussions with local communities to manage human-elephant conflict in the best way, as well as proper plantation management to avoid conflict with these animals. We installed 11 COLA Satellite units to monitor the movements of elephant herds that frequently cause conflict in the state of Johor between 2019 and 2021, and also the establishment of the Johor Elephant Sanctuary, which will be fully completed in 2025, which we hope will help reduce elephant conflict in the state of Johor...

The Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsa

Ya.

The Honourable Member for Parit Buntar would like to request the floor briefly. Thank you, Honourable Minister. Not only are elephants a threat to villagers and destroy crops, but on the Kerian side, Parit Buntar and Bagan Serai, wild boars and monkeys are also a threat and can even cost lives. There are many cases involving villagers who have died, become disabled and so on because they were hit by wild boars, and crops have been destroyed by monkeys and langurs. So what action will PERHILITAN take?

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

As I have ...

Dr. Hajah Halimah AliPAS · PNKaparEN

Honourable Minister, add...? Yes, at least a little. One second. Regarding the wild boars just now, among- it is not interesting, but what is strange now is that these wild boars have even gone to homestays. Homestays in Meru, at Bukit Kapar. So it threatens the business of- people who want to come....

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you to the Honourable Member who stood up. Indeed, as I said, returning to the issue of trees, it is when their habitat problems are disturbed. As I have answered before, when conflict causes loss of life or injury, the government has provided a fund for compensation. However, what is often raised and debated the other day is when crops are affected, when plantations are affected, so what is the response? So for now, we are discussing with the Ministry of Agriculture and Food Security (KPKM) for us to prepare. The government may also not be able to provide full compensation

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

but at least a token of sympathy to help the victims involved. Next, the Honourable Member for Saratok raised the Biodiversity Protection and Patrolling Programme (BP3), and indeed it has been running since 2019, and has shown effectiveness in combating encroachment, illegal logging and also wildlife poaching, and we involve veterans of the Armed Forces, veterans of the Royal Malaysia Police (PDRM), Orang Asli communities and local communities. For 2023, the government will coordinate this programme in Peninsular Malaysia as well as Sabah and Sarawak, and the NGOs involved in BP3 are WWF, the Malaysian Nature Society (Pertubuhan Pelindung Alam Malaysia), Traffic Southeast Asia, and many other NGOs such as RIMAU, Panthera and Malaysian Nature Society (MNS). For this year, as has been announced, the government will increase the number of these rangers to 1,500 people. Next, the Honourable Member for Puchong... [Looking at the seat of the Honourable Member for Puchong] Not there. Okay, the Honourable Member for Kemaman and the Honourable Member for Baram, and several other Honourable Members, urged the government to set up a 'Climate Change Department' to show seriousness in tackling the issue of climate change. For now, the Ministry is developing the Climate Change Bill. The development of the Climate Change Act will also study the need to establish a regulatory entity or strengthen existing entities. There are two models: we can set up a new agency or we can strengthen what we already have. For now, the Public Service Department (JPA) is also reviewing NRACC's application to add positions in the Greenhouse Gases Unit, Climate Change Division, as an interim measure towards establishing a National GHG centre, as agreed by the Cabinet last year...

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

The Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Yes. Time is short. I ask to continue, Mr Chairman.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

I would like to ask for the Honourable Minister's views on the proposal I mentioned earlier.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

I would like to continue because time is short, Honourable Member. Next, although the Honourable Member for Puchong is not here, I just want to touch briefly on the Environmental Quality Monitoring Programme (EQMP). At this stage, NRECC will review the concession that has been given to this company to see its effectiveness. The Honourable Member for Setiu? The Honourable Member for Setiu spoke about waqf. The proposal to establish environmental waqf is welcomed, and we will study the proposal given by the Honourable Member for Setiu. Next, the Honourable Member for Kuala Langat raised the issue of pollution of the Langat River, which may affect water treatment plants. In an effort to overcome the river pollution problem, in the Langat River, the Department of Environment (DOE) has implemented a strategy that covers enforcement programmes on sources of pollution, monitoring of river water quality and the implementation of communication programmes. Among the measures taken is to strengthen enforcement under the Environmental Quality Act 1974, and this includes operational detention, compounds, court action, withdrawal or suspension of licences, and also orders prohibiting operations. Ensuring that development projects subject to EIA, especially those involving earthworks, must provide erosion and sedimentation control plans and comply with the conditions of approval of the relevant EIA reports. Identifying complaint locations that are often associated with pollution under Act 127 so that enforcement is more focused. Increasing the use of

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

...technology in monitoring the compliance of factories discharging effluent water using drones, as well as online reporting of environmental monitoring, and enhancing the use of river water quality monitoring data and information to plan and formulate enforcement strategies. Finally, for this matter, SPAN has established an emergency action plan for Selangor Water as the operator to deal with water supply disruptions due to plant closures. The Honourable Member for Tangga Batu, the Honourable Member for Kuala Nerus. Okay, regarding the establishment of the Environmental Crime Prevention Unit for the purpose of controlling this pollution, SPAN will strengthen the enforcement of the Environmental Quality Act 1974 as well as the Water Services Industry Act, including carrying out integrated enforcement with the Royal Malaysia Police (PDRM), local authorities (PBT), and other agencies. I will finish with two more points, just a little more, Mr Chairman. First, regarding renewable energy raised by the Honourable Member for Muar earlier. For information, up to December 2022, a total of 10,505 Feed-in Tariff (FiT) projects are in the operation and construction phases. Of this total, 98 per cent, with a capacity of 615 megawatts, have begun operating, and the rest are in the construction phase. We are also aware that it is not difficult for developers to obtain financing for renewable energy; the government has provided the Green Technology Financing Scheme (GTFS), which provides government guarantees for financing by financial institutions. We also have GITA and GITE, which are initiatives introduced to provide tax reductions and exemptions to PBB projects. The government is also aware that we need several more steps to ensure that it is more vigorous—the increase of renewable energy, because hydro itself, if it is large hydro, many countries do not consider large hydro as renewable energy. We need to focus on mini hydro, solar, and other energies. Regarding the export of renewable energy, the previous Cabinet decision did not allow exports, but the government is studying whether that is the best decision to ensure we can increase the scale of renewables in our country, and also to ensure the national interest is protected. So, that is at the government's study stage.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Finally, on the matter of floods. The Honourable Member for Kemaman...? Oh, he is here. On the status of the implementation of sabo dams across the country. The construction of sabo dams in Yan District at Titi Hayun and Tupah, with a contract cost of RM22.8 million, is at 98 per cent completion and is expected to be completed in June 2023. The sabo dam in the Sungai Kupang Basin, Baling, Kedah, is at the specification preparation stage and is expected to be tendered in May 2023, covering the Kampung Iboi area. 44 sabo structures across the state will be applied for under RP4, and the implementation of a headwater flood warning system has been included in the components of this project. The Honourable Member for Parit Sulong asked about the river conservation issue to reduce flood risk in the state of Johor. A total project cost of RM36 million was approved in 2022, and RM26.19 million has been spent. For the Parit Sulong constituency, a total of 10 minor works have been implemented at a cost of RM1.16 million. We also—the Department of Irrigation and Drainage (JPS) has also implemented the construction project of U-shape concrete from the Sungai Batu Pahat to Pekan Semerah for upgrading eco-friendly drainage system works and related works in Batu Pahat District, Johor. This project started on 14 October 2020 and is expected to be completed in June 2023, amounting to RM7.6 million, and the review...

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

The Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsa

Ya.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Regarding the U-shape concrete from Sungai Batu Pahat to Semerah, the approved allocation

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

is RM20 million, but the Honourable Minister stated that RM7 million has been carried out. I have been informed by the district JPS that even RM20 million is not enough to reach the end; it only reaches halfway. That is why I asked whether it could be extended all the way to the end, to the Semerah and Muar border. Muar would also benefit. Okay, thank you.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

If I follow what is here, it starts from Petronas Parit Bintang to SMK Dato' Onn Mukim 3 Peserai—sorry, that is the project just now—but from SMK Dato' Onn to Pekan Semerah it is implemented by the Public Works Department (JKR). But I will—the ministry will check what the Honourable Member raised just now, regarding whether it is sufficient or not. According to the check by the JPS Johor State office, all pumps at the pump houses are functioning well, but what was reported as damaged are the mobile pumps installed at Kampung Parit Aton and Parit Yaani, and replacement pumps will be sent to those locations this afternoon, which is the latest information we have received...

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsa

Dan...

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Minister, please wind up. Written reply.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsa

Okey.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

Honourable Minister, may I ask briefly about the Krubong flood mitigation, Tangga Batu.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Yes, there are indeed many floods. If I may reply in writing, Mr Chairman.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Please, Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

The matters I did not have time to answer just now.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Please, Honourable Minister.

Dato' Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

Mr Chairman, I just ask the Honourable Minister—the important thing earlier was the river denai. Will that project be continued? A written reply is also fine. Second, the flood mitigation at Tepuh Baruh Air Leleh. That is all, thank you, Mr Chairman.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Written reply from the Honourable Minister. Written reply. Honourable Members, the question is that the sum of RM1,674,694,400 for Head B.23, Estimates of Operating Expenditure 2023, form part of the Schedule, be agreed to. [The question was put and agreed to] [Head B.23 ordered to form part of the Schedule]

Mr ChairmanEN

The question is that the expenditure under Head P.23, Estimates of Development Expenditure 2023, be approved. [The question was put and agreed to] [Head P.23 approved to form part of the Estimates]

Bill — Supply Bill 2023 and Development Estimates Motion 2023 Committee — Head B.43 [Schedule] – Head P.43 [Development Estimates 2023] –Bill

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Supply Head B.43 and Development Head P.43 under the Ministry of Local Government Development are open for debate. For the information of the House, 16 Honourable Members will debate. The following list; Honourable Members whose names are mentioned, please be ready: the Honourable Member for Bakri, the Honourable Member for Maran, the Honourable Member for Tanjong Piai, the Honourable Member for Kuala Langat, the Honourable Member for Batu Gajah, the Honourable Member for Hulu Selangor, the Honourable Member for Betong, the Honourable Member for Kuantan, the Honourable Member for Wangsa Maju, the Honourable Member for Kuala Nerus, the Honourable Member for Kluang, the Honourable Member for Tumpat, the Honourable Member for Kalabakan, the Honourable Member for Arau, the Honourable Member for Lubok Antu and the Honourable Member for Balik Pulau. The House will begin, and the Honourable Member for Bakri is invited.

Not in the House.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

If the Honourable Member for Bakri is not present—one, the Honourable Member for Bakri—two, the Honourable Member for Bakri—three. I will proceed with the Honourable Member for Maran. [Mr Speaker chaired the Committee]

In the name of God, the Most Gracious, the Most Merciful. Peace be upon you, the mercy and blessings of God, and greetings of peace. Thank you, Mr Chairman, for allowing me to debate the Ministry of Local Government Development, which has been allocated a sum of RM5.3 billion, with operating expenditure of approximately RM1.77 billion and development expenditure of RM3.558 billion. Mr Chairman, if I am not mistaken, approximately RM7.58 million has been reduced from the budget proposal prepared by the Keluarga Malaysia Government under the previous ninth Prime Minister, namely the Honourable Member for Bera. Which portion was reduced, when the Kampung Baharu Programme was reinstated from the Ministry of National Unity with an increase of more than 30 per cent, from RM67 million to RM104 million? This actually exceeds the allocations given to the important departments under this Ministry of Local Government Development. Mr Chairman, I wish to touch on several matters. First, Item 030100 – Fire and Rescue. My congratulations and thanks to the former Director-General of the Malaysian Fire and Rescue Department who has just retired, Yang Amat Setia Dato' Sri Hamdan, and congratulations to his successor, Yang Amat Setia Dato' Wahab, who has taken over as Director-General of Fire and Rescue. Thanks also to the fire and rescue services, which have provided very good cooperation in enhancing the nation's image and providing rescue services during the earthquake in Turkiye and Syria.

Honourable Member for Maran, the Honourable Member for Setiu would like to say a little about this fire service.

Wait, wait, I have not yet— Mr Chairman, Item 30000 – Construction of Fire and Rescue Department (JBPN) Buildings in Peninsular Malaysia.

I want to draw the ministry's attention. We have proposed a fire station at Chenor or Pekan Awah, Maran, at a cost of approximately RM4 million, and the land has been identified. I understand that the allocation for land matters has also been proposed by the ministry. I want to know when this fire station will be built. When will this fire station be constructed, and what initial action has the government and the ministry now taken in implementing this proposal?

I do not want the Minister to propose one or two new fire station projects while several projects that have long been proposed by the community and the government before were cancelled and stopped. Please, Honourable Member.

Okay, thank you, Honourable Member for Maran. I would like to ask about the fire service in connection with Fire Volunteers. Are the Fire Volunteers paid an allowance, like the APM Volunteers, RELA, and others? If there is no allowance, I propose that an allowance be given to them. Thank you.

Thank you, Honourable Member for Setiu. In fact, we once raised the allowance for this fire service from RM6 to RM8, and we want to absorb those fire personnel who carry out services for this community. Thank you. I will include the Honourable Member's speech in my speech for the government's attention. Mr Chairman, Item 030200 – National Housing. The previous government had targeted approximately 500,000 affordable housing projects to be implemented under the Twelfth Malaysia Plan. I would like to ask, will this proposal or target be continued by the government today? Second, there are approximately 15 to 16 agencies involved in housing construction. To what extent will the government coordinate these agencies, including departments and agencies under other ministries, to ensure housing construction in this country can be coordinated and its implementation expedited? Thank you, Mr Chairman. Item 17400 – Kampung Baru Development Programme. As I mentioned earlier, Kampung Baru was previously under KPKT. Then it was moved to the Ministry of National Unity. Now, with the new Minister, it has been moved again to the Ministry of Local Government Development. What reason was given? Yet the allocation provided is larger than the allocations given to the important departments under the Ministry of Local Government Development. Next, Mr Chairman, Item 01901 – Local Plans to Item 01907 – Special Area Plans (RKK) under Town and Country Planning. Approximately RM23 million is allocated. I would like to ask the ministry. I have served in the district, the state and so on. There are—in fact, these local plans are very good and have been prepared by the Town and Country Planning Department. However, when proposing development projects at state or district level, sometimes they do not refer to the local plans that have already been prepared. Is the government aware of this situation? What action has the ministry taken, including the Town and Country Planning Department, to ensure that every plan made is followed by the state and district? I would also like to ask, is the phenomenon that occurs today, such as flood disasters, landslides and so on, caused by state or district areas not implementing projects in accordance with the plans made by the Town and Country Planning Department? I think this matter needs to be given attention by the ministry because the losses incurred from the implementation, or the matters affected by disasters such as floods and landslides, are very

great. Not only to the country but also to the society in our nation. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Tanjong Piai.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Thank you, Mr Chairman. I would like to refer to Item 010100 – General Administration and Item 020100 – Local Government. Mr Chairman, the pandemic phase has ended and we are now in the endemic era. Many parties see more positive business potential. Therefore, many want to start businesses or revive projects that were stalled due to the COVID-19 pandemic. Parties involved in commercial activities or other businesses know the need to apply for business licences from the local authorities. For the information of this honourable House, I have been informed that the Johor State Government has proactively taken the approach of introducing the implementation of the Johor fast lane on 14 June 2022 as a guide for internal and external technical departments, principal submitting persons and developers for industry implementation. If one reads the procedures provided in the fast lane, everything appears easy, and applicants are able to prepare all the required documents and requirements. However, in reality, it is not as easy as expected, because based on feedback, the implementation of the fast lane depends largely on the response from all departments and agencies involved. I have received complaints from applicants saying that the PBT cannot process applications quickly due to delays in comments from the departments involved. I have also been informed that the Fire and Rescue Department of Malaysia is among the departments or agencies that are often late and slow in giving comments compared to other agencies or departments. The delay is said to be caused by a shortage of Fire Department officers in the area. Comments from the Fire Department are required for business licence applications and also building approvals in the case of obtaining a Certificate of Completion and Compliance (CCC), or Sijil Layak Menduduki, for a newly built building. For business licence applications, the Fire Department's comments concern compliance with safety requirements such as the provision of fire extinguishers, emergency exits and so on. The most critical issue that I understand is that Fire Officers do not have absolute power over the comments given. The comments must be sent to the state Fire Headquarters to receive a response, and only after being supported and approved at headquarters level are they returned to the local authority. This causes comments to be delayed and to take a long time. Therefore, I propose to the ministry that the power be delegated to officers at district level, or that the number of staff given the authority to make decisions in such comments be increased. Besides that, I believe the PBT is intended to be a one-stop centre for managing any licence applications. This means applicants do not need to deal with departments or agencies separately. However, I have been informed that the Fire and Rescue Department of Malaysia, at the same time, still requires applicants to deal with the department to obtain all the related forms that should be obtained at the one-stop centre. If that is true, I see that what the Fire Department is doing does not reflect the intention of the one-stop centre's establishment. I see this situation as unhealthy and disrupting the smooth running of the centralised system. I believe the PBT has set a time period for a comment to

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

be made and returned for further processing. Non-compliance with this time period will cause double delays if applicants are slow to be informed of any non-compliance with conditions, which will then slow down the corrective action that must be taken by the applicant or developer. Therefore, I propose to the government that licence applications or approvals to implement projects be issued within one month from the date of application if the application has complied with all conditions. This is because delays not only cause losses to traders but also to the government in terms of tax collection. The ministry, departments or agencies concerned should carry out a study and review on the causes of delay, so that a comment does not have to take too long, and corrective action is taken so that the true meaning of the fast lane truly meets its purpose and objective. Mr Chairman, I also want to touch on Item 02077 – Development of Chinese New Villages. Basic facilities in most Chinese New Villages have been upgraded. There are also some Chinese New Villages that have been upgraded immediately after the development of housing estates around them. Therefore, socio-economic development in the Chinese New Villages must be given emphasis in line with the development of the digital era. With the economic development of the Chinese New Villages, young people no longer need to migrate to cities to seek employment and leave their hometowns. This directly increases the productivity of the villages, which no longer depend only on the elderly. Therefore, I want to ask the ministry. What facilities are provided to those who want to venture into business in the Chinese New Villages, such as loan facilities to start a business?

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

I also propose that the application process be simplified and approvals be granted within a short period of time. Thank you.

Mr ChairmanEN

Alright, thank you. I invite the Honourable Member for Kuala Langat.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

Thank you, Mr Chairman. I would like to touch on matters relating to the Town and Country Planning Department (PLANMalaysia), which plans, coordinates, controls the use and development of land and buildings within the areas of local planning authorities. I refer directly to page 379, Item 020000 – Sustainable Urban Environment, Item 020400 – Town and Country Planning (PLANMalaysia). We are aware that any new urban development or housing plan has guidelines that must be followed until it is brought to the State Planning Committee and approved by the state government. There may also be amendments that take place until it can be implemented. I see that the involvement of the surrounding areas is necessary, especially where it involves areas bordering different local authorities or different districts. I would like to touch in particular on the provision of places of worship and religious sites in residential areas, which we know have standards, including facilities for mosques, surau, temples, kuil, churches or gurdwaras. The standards for their provision include the different congregations or adherents, whose numbers vary according to their needs, as well as the minimum land area of those places of worship. This extends to the distances, in minutes, metres or kilometres, between certain sites, because I see that there are sensitivities attached to them.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

I have a view or proposal to the ministry that these places of worship should ideally be placed on different sites. For example, Islamic places of worship should be on a different site from non-Islamic places of worship. This is because I see there are several sensitivities, including that we do not want, when it happens, that we know we want to foster the harmony of racial diversity and religious faiths, but we do not want there to be "friction" when these places of worship are on the same lot, because it may involve sounds, loudspeakers and so on, which may eventually cause some disturbance or even conflict in certain areas. I would like to take this as a point of reference. For example, in my constituency, the development of Canary Garden in Bandar Bestari, Klang, which recently also became an issue that flared up. Although this falls under the Klang Municipal Council, it borders the Kuala Langat Municipal Council, and recently, when banners were put up for the development of a temple or Hindu place of worship, although it is within the Canary Garden area, it is really located in a Malay Muslim village area. I do not deny the need for Hindu adherents in Kampung Air Hitam, but the distance is quite far. So this has also raised concerns among the Muslim community there and objections which I think have some merit. I see that although this site was in fact an institutional and public facilities site and was approved in principle for the development of a temple, it was subsequently rejected because of the road plan, which is still not orderly. Recently, there has been what appears to be a groundbreaking, which has raised concerns among the Muslim community there. I hope the Honourable Minister, perhaps the state government and also the local authority can handle this issue well. Second, I would like to touch on page 382, Item 30000 – Construction of Buildings for the Fire and Rescue Department of Malaysia in Peninsular Malaysia, and Item 31000 – Procurement of Vehicles/Helicopters and Fire-Fighting Equipment. As we are aware, Kuala Langat is Klang Valley II, where development is very rapid, including the upcoming development of IDRISS and the development of Pulau Carey Port and several other developments, including the West Coast Expressway alignment, which may also be exposed to accidents and so on. We also know that part of Kuala Langat is peat land that requires very substantial fire and rescue services. Today we have a Banting Fire and Rescue Station that is very small in area and whose building structure is indeed old. I do not deny that there is a new Teluk Panglima Garang Fire and Rescue Station, but I would like to raise the point that its facilities are too limited. There are no water tankers needed to carry water when fires occur, whether peat fires or otherwise. There is no sky lift when fires occur in multi-storey buildings, and while we do not deny that assistance can be obtained from the Fire and Rescue Stations at KLIA or Port Klang, it will take time. So, I hope that equipment such as this, including, I am informed, the need for four-wheel drive when peat fires occur, because it facilitates the movement of the firefighters themselves. I am not, not out of envy, but if we look at the areas of Sabak Bernam or Sekinchan, they have fairly good fire stations; perhaps there is also a need there. However, given the situation of Kuala Langat as a district or local authority, the local council that is developing very rapidly. These are among the matters that I think should be considered by the ministry. Thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Assalamualaikum warahmatullahi wabarakatuh and greetings, Mr Chairman and all Members of the House. I thank you for being given the opportunity to take part in the debate on the Budget 2023 at the Committee stage. I would like to touch on P.43, Ministry of Local Government Development, and Item 01513, Item 00500, Item 04001, Item 04000 and Item 00100. Item 01513 falls under the heading National Housing, namely the People's Housing Programme (PPR). There are 22.8 per cent of urban residents who are still renting. This is the result of the Household Income Survey Report of 2019. With the additional allocation for this year, God willing, it is hoped that this can be reduced. It is also hoped that the PPR programme can provide an opportunity for low-income groups to own their first home. Therefore, I seek an explanation of how many of these low-income groups will benefit from this programme? In addition, usually in PPR areas there are several food stall facilities or commercial spaces. These usually disrupt traffic or parking. I therefore seek an explanation: are basic facilities such as these stalls or eating spaces in PPR to be upgraded in line with the wish of the Most Honourable Prime Minister who wants food stalls to be upgraded? Given that there is a large increase in this year's allocation from RM98.4 million to RM383.94 million, Batu Pahat requests details of the expenditure breakdown for this heading. Item 00500 falls under the heading Solid Waste Management. We know that solid waste will increase from time to time. Therefore, I seek an explanation whether solid waste disposal centres will be provided in every urban area where the population density is between 300,000 and 500,000 people. I also request details: if this solid waste increases as a result of this population density, will the collection that is usually done once every two days be done frequently, such as every day? Mr Chairman, because of the large increase from the allocation of RM106.4 million to RM245.9 million, I also seek an explanation whether new compactor garbage lorries will be provided to improve the quality of service, because we understand that most of these compactor lorries are already dilapidated and may cause discomfort to the public. I also request details whether the schedule for the collection and segregation of solid waste will be made known to the public so that- it is one way to improve service.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

What if it were placed in visible places such as at mosques, surau, temples, and bus stands and so on? Under the heading Urban Welfare, namely Item 04001 – Housing Maintenance. There are these public low-cost houses that look dilapidated and appear as if they have not been painted for some time. I also seek an explanation regarding the four- or five-storey PPR buildings that have no lifts, and buildings that are more than 30 to 40 years old. Are there any proposals to install lifts, to help senior citizens or the sick to live on upper floors? Under the heading Urban Welfare, namely Item 04000 – Urban Poverty Eradication Programme. I also seek an explanation, I would like to know, what kind of urban poverty eradication programme, especially in the Batu Pahat area? Second, who will be involved in its management? Third, when will the programme start or what is its duration, especially in the Batu Pahat area? Which states will be given priority?

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Under the heading Local Government, namely Item 00100 – Small Projects in Local Authority Areas. Please also provide details. First, what programme or type of small project/projects will be implemented? Which local authority or state local authority will be given priority? What is the cost of each of these small projects? At the same time, the maintenance of residential area drains needs to be carried out periodically. Flash floods happen more quickly if many drains are clogged. In fact, there are residential areas that do not have good outflow drainage. So, I hope this matter is carried out thoroughly so that Malaysia becomes cleaner. Because there is an increase in allocation of RM170 million for this item, please also detail the expenditure under this heading, namely, does this involve drains or ditches in residential estate areas? Is there a plan to address the flash floods that often occur in local authority areas, particularly the Batu Pahat Municipal Council? That is all, thank you, Mr Chairman.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Hulu Selangor.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Assalamualaikum warahmatullahi wabarakatuh, and greetings. Thank you, Mr Chairman. Mr Chairman, I go directly to Code B.43, Item 020000 – Sustainable Urban Environment. For this item, three matters are involved. The estimated expenditure cost is RM241,934,500. I would like to ask, what is the scope of the ministry in assisting local authorities? Hulu Selangor is a fairly large area, which will definitely need attention and assistance from the government. The first matter under this item, in Bukit Beruntung and Bukit Sentosa, there are shophouses that have owners and some that have no owners. This greatly affects development when there is high demand involving owners. Indirectly, it affects a development. This happens when an agency wants to carry out development; it is very difficult when it involves owners. Some set high rents, even though the area is empty. I request that the ministry look at and help with development in Bukit Beruntung and Bukit Sentosa. The second matter under the same Item 020000. Besides that, Lembah Beringin is more pitiful. No development plan can be seen. There is only one school, namely Sekolah Rendah Kebangsaan Lembah Beringin. There is no secondary school and no religious primary school. At Sekolah Rendah Kebangsaan Lembah Beringin, there is one problem that has still not been solved, having dragged on for six years since 2017. The problem is a landslide at the back corner of the school, near the TNB sub-station. What happened is that the monsoon drain burst, causing soil erosion to occur and it has grown bigger. I earnestly request that the ministry may be able to provide funds to repair the monsoon drain before an undesirable incident occurs. Secondary school students, meanwhile, have to commute back and forth to Kuala Kubu Bharu, which is nearly 20 kilometres away, taking 30 minutes by road. I request once again that the ministry pay attention to finding a way to develop the Lembah Beringin area. Mr Chairman, the third matter under the same Item 020000 is that Hulu Selangor also has a community college in Batang Kali. It is one of the institutions in the Hulu Selangor area. It also operates well. However,

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

it does not have its own building, no hostel, no place for recreation, namely a field and sports facilities. I request once again that the ministry provide a site and a new building to build a community college with complete learning facilities, student hostels, a field and sports facilities. Mr Chairman, next, Code B.43, Item 030400 – Housing and Strata Management Tribunal. The estimated expenditure cost is RM8,854,700. Apartments or multi-storey housing areas are regulated by a joint management body (JMB) or MC. This organisation is very important in ensuring the governance of assets and strata, covering infrastructure facilities such as lifts and also community areas. At the local authority level, through the COB, it has been tasked with assisting all multi-storey houses to ensure that the JMB runs well. Some JMBs are managed by third parties for certain reasons. Among them, the inability to manage the problems of managing their own premises and others. I request that the ministry look at this issue seriously, because it affects residents when management is handled by third parties. It is very detrimental to residents because it involves high management payment costs. Mr Chairman, to resolve the issue of strata ownership, it is not handed over wholesale to the JMB. The JMB is unable to manage matters relating to strata that should be managed by the developer. Unfortunately, many developers have closed down. The term is closed down, but they have not really closed down. They set up a new company under someone else's name, and the victims are the owners of the terrace houses. I earnestly request that the ministry have compassion for those who live in these multi-storey houses, who need attention to own a house in their own name. Finally, I will take a little space and ask for a little time regarding the ECRL project, which we talk about in every story on the ECRL, including in my constituency of Hulu Selangor, namely in Serendah. What is quite problematic now is that the contractor is using residential routes, which has already been reprimanded by the Hulu Selangor Municipal Council, but the contractor still continues through areas that we should not pass through. There are other roads but they do not want to use other roads. They use the route through the residential estates there, four housing estates. So I request the ministry, perhaps it can help to solve this problem with the stubbornness of the contractor who does not want to back down even though they have already been reprimanded or even summonsed.

Honourable Member for Hulu Selangor, a little quicker, please.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Mr Chairman, that is all. Thank you.

Mr ChairmanEN

Alright, thank you. I invite the Honourable Member for Betong.

Greetings, good afternoon. Thank you, Mr Chairman, for the opportunity once again for me to take part in debating the budget at the Committee stage under Code B.43 and P.43, Ministry of Local Government Development. I will raise two or three important issues for the rural local authority areas in Sarawak. Firstly, I go directly to Item 00100 – Small Projects in Local Authority Areas. The RM560.395 million that has been distributed this year is a significant increase compared with RM390.139 million last year. Small projects in local authority areas are very much needed for the Betong District Council.

In the Betong Parliamentary constituency, a rural local authority very much hopes for additional allocation to resolve local infrastructure and facilities issues. Therefore, my question is, what is the total allocation for Sarawak? I request that the allocation for the Betong District Council also be increased. Second, Item 030100 – Fire and Rescue. In relation to this item and taking into account the longhouse fire cases that frequently occur in rural Sarawak, Betong would like to request and propose to the Honourable Minister. First, introducing and also making mandatory the installation of fire hydrants in longhouses that have water supply facilities.

In Parlimen Betong, a rural local authority (PBT) greatly hopes for additional allocation of funds to resolve local infrastructure and amenity issues. Therefore, my question is, what is the total allocation for Sarawak? I also request that the allocation for Majlis Daerah Betong be increased.

Second, Item 030100 – Fire and Rescue Services. In relation to this item, and taking into account the longhouse fire cases that frequently occur in rural Sarawak, Betong would like to request and propose to the Honourable Minister. Firstly, to introduce and also make mandatory the installation of fire hydrants (pili bomba) in longhouses that have water supply facilities.

Secondly, the provision of fire extinguishers to longhouses that are far outside the towns. If the government could consider this, it would greatly help us who live in rural areas, in longhouse areas that have no fire station facilities. This is because a single longhouse can have up to 50 family doors. Secondly, there are also many longhouses in remote interior areas that have no fire station facilities at all. Thirdly, Item 30001 – Construction of JBPM Buildings in Sarawak. I see that the expenditure allocation is very small, only RM490,000. My question is, what construction projects can be carried out with such a small amount? For the information of the Honourable Minister, Mr Speaker, many Members of Parliament from Sarawak have asked me to raise this as well. Many of them have also asked for fire stations in their respective areas. What are the ministry's plans and commitments to add more fire stations in Sarawak? Fourthly, Item 31000 – Procurement of Vehicles/Helicopters and Fire-Fighting Equipment. A total of RM46.51 million has been allocated this year, a large increase compared with RM9.9 million last year. Under this item, can the government consider supplying vehicles and equipment for volunteer fire brigades? For example, in my area there are already two volunteer fire teams that need vehicles and basic equipment so that they can assist the fire department in any local fire incident. Next, I move on to Item 40000 – SPNB and Item 01513 – Rent-to-Own Public Housing Programme. In connection with these two items, I would like to raise several questions as follows. What is the number of project beneficiaries approved each year since 2018 in Sarawak? If there are any in Betong, please state them. How long is the process to approve a single housing application under SPNB for certain cases in Sarawak? Finally, related to the longhouse fire cases as well. Generally, the victims, who are mostly from the B40 group in rural areas, take five to 10 years to rebuild a new longhouse. Can the government help in terms of policy for cases of longhouses that have burnt down? Providing a special allocation to facilitate the reconstruction of longhouses through a special SPNB project or the Projek Mesra Rakyat on the sites of the burnt houses. If this can be considered by the ministry, it would greatly help the victims to start a new life. That is all, thank you.

Mr ChairmanEN

Thank you, I invite the Honourable Member for Kuantan.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Thank you, Mr Chairman. I refer to B.43, Item 020100 – Local Government. A reduction in allocation of five per cent compared with 2022. I would like to obtain information on the total allocation received by the Kuantan Parliamentary constituency. Mr Chairman, under local government I would also like to obtain further information regarding business premises owned by

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

the PBT in the Kuantan Parliamentary constituency, namely the number of business premises owned by the PBT, the percentage of those premises rented out to young people, and the number of premises that are still not rented out. Next, Item 030500 – Community Welfare. With an increase in allocation of 39 per cent for 2023 compared with 2022, I would like to ask: how many urban poor who have been successfully lifted out of poverty through the Entrepreneurship Skills Programme last year? I would also like to obtain the types of entrepreneurship programmes that the ministry has implemented, including entrepreneurship programmes in the Kuantan Parliamentary constituency. I also want to know, what percentage of the target against the total participation of the urban poor can be lifted out of poverty in 2023? To establish strategic cooperation with agencies and NGOs, I would like to propose that the ministry provide a special premises to them, to associations of persons with disabilities in every district, so that they can run their operations in a more organised manner. Mr Chairman, referring to Item 030400 – Housing and Strata Management Tribunal. With only a 5.4 per cent increase allocated compared with 2022, is this enough to resolve strata-related issues? Yet at this time the cost of goods and wages have risen, so I seek an explanation from the ministry. Next, Item 00200 – PPP/PFI. For this year, a very significant increase of 2,798 per cent compared with last year's allocation. I hope all PBTs receive this allocation. I ask the Honourable Minister to give details of the breakdown of this allocation, and also how much of this allocation will be channelled to the Kuantan Parliamentary constituency. Next, Item 040400 – CCTV Rental. The allocation for 2023 has been reduced by 97 per cent compared with 2022. I seek the explanation of the Honourable Minister, why has this allocation been reduced? I also propose that CCTV be installed at recreational centres such as lakes, rivers and beaches to monitor the safety of visitors, as well as in areas that are frequently hit by floods or flash floods in housing estates. Mr Chairman, referring to Item 00100 – Small Projects in Local Authority Areas. An increase in allocation of 43.6 per cent compared with 2022, please obtain a list of the types of small projects to be implemented and the breakdown of the allocation to each state and the total allocated to the Kuantan Parliamentary constituency. Item 00900 – Studies Under KPKT. I would like to ask about the types of studies that have been planned, causing an increase in allocation of 989.7 per cent.

May I interject, Honourable Member?

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Yes, the Honourable Member for Maran.

Thank you. Mr Chairman, thank you, the Honourable Member for Kuantan. I would like to get information from the Honourable Member: does the Honourable Member know which parties are involved in carrying out this study, whether within the ministry or experts from outside? Also, if the Honourable Member can obtain this information, what is the performance of the panel of experts or expertise panel involving those who were selected by the government earlier? Is their performance so unsatisfactory that it may have forced the ministry to engage experts or conduct studies involving experts from outside? Thank you, Honourable Member.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Thank you, the Honourable Member for Maran. Please include the Honourable Member for Maran's speech in my speech. Next, referring to Item 01907 – Special Area Plan (RKK). There is RM1.5 million allocated compared with no allocation in the previous year. I would like to obtain the details of that item, the development location for this allocation, and the total allocated in the Kuantan Parliamentary constituency. Finally, I would like all that I have raised here to be answered. If it is not covered in the question-and-answer session, please submit it in writing, thank you.

Mr ChairmanEN

Alright, thank you. I invite the Honourable Member for Wangsa Maju.

Tuan Ts. Zahir bin HasanPKR · PHWangsa MajuEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of peace. Thank you, Mr Chairman. I will continue with Item 00200 – PPP/PFI. The revised estimate for 2022 is a total of RM48,990,924 compared with the estimate for 2023 of a total of RM1,420,192,000. This is a very high surge in the amount, an increase of RM1.37 billion compared with last year. PPP/PFI is a method of public-private partnership. It generally uses the financial facilities and expertise of the private sector. It can be operated or implemented through various approaches and models, including design, build, finance and operate (DBFO), build-own-operate (BOO), build–operate–transfer (BOT) and also build–own–operate–transfer (BOOT). Therefore, what is the ministry's justification for requiring such a large additional expenditure this year? What are the projects that have been identified? The following refers to Item 04001 – Housing Maintenance, totalling RM90,400,000, and Item 01604 – Repair and Maintenance, totalling RM24,853,700.

Tuan Ts. Zahir bin HasanPKR · PHWangsa MajuEN

The Honourable Deputy Minister informed this House on 14 March last that, up to 31 January 2023, there were 4,218 low-cost projects nationwide. Of that number, 1,084 low-cost projects do not have, or have not yet established, a Joint Management Board (JMB) or Management Committee (MC), with respect. Even where a JMB or MC exists, they face challenges and constraints in carrying out maintenance work such as lifts, water tanks and so on, much less where a JMB and MC do not exist or have not yet been established. In Kuala Lumpur alone there are 178 low-cost projects with more than 400 lifts and more than 600 water tanks. If in Kuala Lumpur alone we take 30 per cent of the lifts and water tanks that need replacement, this means more than 180 water tanks and more than 120 lifts that need to be replaced. If the replacement cost of a lift is RM400,000 each, a budget of RM50 million is only sufficient for 120 lifts. This does not yet take into account other maintenance costs. For example, the water tanks in Seri Langkawi 1, Wangsa Maju, which need to be replaced, still overflowing with water since the middle of last year. I seek appropriate consideration. Next, referring to P.43, Item 01513 – Public Housing Programme totalling RM383,942,400. In implementing housing development projects to increase the supply of affordable housing, the implementation has created other problems. For example, when affordable housing development fulfils the compliance requirement imposed on developers, which is to provide one parking bay for every unit built. This has created a situation where many cars are parked along the roadsides and sometimes in the middle of roads because some affordable housing owners have more than one car. To give an idea, if one affordable housing project has 2,400 units and only 50 per cent of them have two cars, this means there will be about 1,200 cars parked along the roadsides and in nearby areas. Congestion is bound to occur. I request that the ministry allocate funds to re-examine compliance requirements, including those relating to the required number of parking bays. Thank you.

Mr ChairmanEN

Alright, thank you. I invite the Honourable Member for Kuala Nerus.

Dato' Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of peace. Thank you, Mr Chairman. I will go straight to page 380, Item 030200 – National Housing. I would like to touch on the Projek Mesra Rakyat housing projects under Syarikat Perumahan Negara Berhad (SPNB) in Terengganu. For Mr Chairman's information, the cost provided is RM70,000 per unit, which is tendered to contractors, and the government provides a subsidy of RM20,000 and the people only pay RM50,000. However, the problem raised now is about the size of the houses. The price has not increased but the size of the houses has been reduced from 1,000 square feet to only 750 square feet. This will certainly create an uncomfortable situation for those families, especially if they have four or five children. Thus, this impact will affect the comfort of the occupants, and will also cause problems for children, especially teenagers, because they will feel uncomfortable at home and eventually seek comfort outside the home and befriend peers who may lead them into various other social problems. Therefore, I would like to ask the government, has the government carried out a comprehensive study on the impact of reducing the size of these houses on the occupants of the Projek Mesra Rakyat that is currently being implemented? I seek the explanation of the Honourable Minister. Mr Chairman, besides that, under this item I would also like to raise the issue of the need to build a Public Housing Project in Kuala Nerus, namely the Jeram housing project in the mukim of Manir, Kuala Nerus Parliamentary constituency. For the information of the House and Mr Chairman, the relevant departments and agencies at state level have already identified the need for this project, and land has been provided measuring 9.5 acres for building strata housing. There are 1,013 applicants from B40 who we consider eligible to receive these houses. Therefore, I hope the ministry and government will approve and expedite the allocation for the implementation of affordable housing or the Public Housing Project in Jeram, mukim of Manir, Kuala Nerus, God willing. Secondly, I would like to refer to Item 030400 – Housing and Strata Management Tribunal, page 380. I would like to raise the matter of delayed, troubled and abandoned housing projects. As I understand it, the government has set up a task force to resolve the issue of problematic housing projects that I mentioned earlier. Based on this item, I seek the ministry's explanation regarding the KPI of the task force that has been raised, and the extent to which the ministry has set a time frame for resolving these problematic housing issues, particularly projects that have been problematic for more than one year? Next, Mr Chairman, I refer to Item 020200 – National Solid Waste Management, page 379. I would like to touch on the circular economy in solid waste management. During the winding-up session of the Honourable Minister of KPKT in the budget policy debate the other day, the Minister mentioned considering amendments to the relevant Act for states that do not adopt Act 672, namely the Local Government Act 1976, including the state of Terengganu. This is to create uniformity in the implementation of the circular economy for solid waste across the country. I would like to request the ministry's explanation on the government's preparations in efforts to implement and enforce the amendment to Act 672, given that the implementation of the circular economy for solid waste requires a very large cost to provide the technological infrastructure that will be used in the future. At the same time, I also believe the government needs to implement more initiatives to support the public in solid waste segregation. Therefore, I request

Dato' Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

the ministry's explanation: is there any study on initiatives to support the public in solid waste segregation? Mr Chairman, next I would like to refer to Item 020100 – Local Government, page 378. I will skip this, there is no time. I move on to Item 030600 – Housing Planning. I would like to touch on the construction of strata housing across the country. Recently, incidents of children falling from strata residential buildings that have resulted in loss of life are frequently heard. Therefore, I request an explanation on whether the government intends to require strata housing developers to equip the housing units built with grilles, especially on the balcony areas, so that the safety aspects of strata housing can be enhanced. I seek the ministry's explanation. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, now I invite the Honourable Member for Kluang.

Puan Wong Shu QiDAP · PHKluangEN

Thank you, Mr Chairman, for allowing me to take part in the debate this afternoon. Mr Chairman, I will go straight to Item 00200 – PPP/PFI, the same as the view of the Honourable Member for Wangsa Maju just now. I ask the Honourable Minister to give this item in detail, namely what projects or programmes will be implemented this year? There appears to be a huge surge in the budget under Item 00200 – PPP/PFI. Secondly, Item 00500 – Solid Waste Management. I ask the Honourable Minister, because the allocation for this item has increased by 100 per cent, to explain the reasons behind the increase for this item, as it appears the year before there was certainly not this amount. We know solid waste management is something that brings a lot of cost. There is a huge cost implication on this issue.

Puan Wong Shu QiDAP · PHKluangEN

Item 040800 – Solid Waste Assistance for Local Authorities (SWCorp), under Supply Purposes, totalling RM10 million. So I ask the Honourable Minister to also inform this august House, how much do we bear, contribute or channel to all PBTs each year solely for solid waste disposal? Most importantly, how many local authorities (PBT) and local government bodies are unable to pay to dispose of the rubbish produced by all residents under their local authorities? If the Federal Government does not channel this assistance, what is the amount of financial challenge they will face, namely that they are completely unable to pay? This is because we know there are PBTs whose revenue is actually insufficient, very low, yet they are forced to bear a large part of the payments to concession companies. Likewise with the current payment rate, namely a lot of our solid waste is actually disposed of at sanitary or non-sanitary disposal sites, but the cost we have to bear is already large. So, with the current payment rate to concession companies, what percentage of each PBT's payment is compared with their actual income? This is because as far as I know, some PBTs may have to spend 50 per cent of their income. Some exceed 50 per cent, up to two-thirds of their income every year just to pay for disposing of rubbish alone. If you cannot answer that orally, I will ask the Honourable Minister or officers to provide an answer in writing so that everyone knows how serious solid waste management is.

Puan Wong Shu QiDAP · PHKluangEN

I also want to stress here that this information is important because many people out there, and perhaps some in this House too, think that solid waste disposal, or throwing out rubbish, has no cost. But in fact the cost implication is huge for us, yet the people out there simply throw their rubbish away. Many have the mentality that as long as the smelly trash disappears from my house, then it is okay. They do not care how the government processes the rubbish or the solid waste. So it is important that our government informs the people about every kilogram and how much we pay, because ordinary people only pay assessment tax and they do not know that every ringgit of their assessment tax – perhaps 50 per cent or up to two-thirds – goes just to throwing away rubbish. They do not know. So, it is important that the Federal Government informs the whole country so that all people know that every ringgit of assessment tax we pay to the PBT, how many sen or per cent we use for rubbish disposal. This is important because I know our government does have plans – regardless of which party, whenever – to build incinerators, and I know incinerator technology is now advanced. I do not deny it, but I want to stress in this august House that incineration is one solution to the solid waste problem before us but not the only solution. We have other solutions. So, it is important that we try our utmost to find other ways out. So, I ask the Honourable Minister to supply these statistics, if available, namely how many units of landed property and also high-rise building units are under the supervision of solid waste management concession companies? This is because we know that in the contract we signed with these solid waste management concession companies, they calculate payment according to the number of housing units they go to collect from. For landed property, it makes sense because they have to go from house to house, but if they also use the same formula for condominiums and for PPR, that does not make sense, because for high-rise buildings they go to one location just to collect rubbish. In some cases, condominiums are also not 100 per cent occupied. So if they calculate by units, I think that is unfair. So it is important that we review this payment formula so that we find a way to reduce costs to the government. There are a few more, Mr Chairman, sorry. So, I ask for one more item, namely regarding the fire service, Item 30000 – Construction of JBPM Buildings in Peninsular Malaysia amounting to RM 103,592,800. I ask the Honourable Minister to list how many projects are planned for implementation this year? Most importantly, whether the Kluang Fire Station is also listed as a project to be upgraded, because the Kluang Fire Station building is indeed dilapidated and has exceeded 80 years of age. The fire station personnel in Kluang have long been waiting for an upgrading project because the building they use now is not modern enough and not suited to modern fire station design, and sometimes the tall fire engines cannot enter and must be modified. So, I ask that, if possible, the upgrading project for the Kluang Fire Station, which our personnel in Kluang have long awaited, be included. That is all, thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Tumpat.

Assalamualaikum warahmatullahi wabarakatuh, Mr Chairman. I would like to refer to Item 030500 – Community Welfare. I would like to propose that the PLANMalaysia consider making planning and planning policy for community planning, because today, planning carried out by PLANMalaysia only goes down to the district and sub-district level. This is suitable for areas that grow organically, such as Kelantan

organically. In this regard, I believe, God willing, Tumpat is ready to be a pilot project for this matter. Second, regarding Item 020200 – National Solid Waste Management. Is the government prepared to provide incentives as encouragement to the PBT to make the circular economy agenda a success? For example, in Kelantan, we have held a programme on black soldier fly (BSF) which is expected to be able to reduce more than five tonnes of rubbish a day. These BSF are reared in a special house built behind the Tanah Merah Wholesale Market, living on organic waste collected by the Tanah Merah District Council and extended to the Dabong District Council as well as the Pasir Mas and Tumpat District Councils. These BSF are able to dispose of daily organic waste and indirectly extend the lifespan of the rubbish disposal site, preserve nature and reduce environmental pollution. I hope this can be implemented in all Parliaments across the country. Next, regarding Item 030600 – Housing Planning. Is the government prepared to ensure that the National Housing Policy is adapted to a Sejahtera Housing Policy in order to provide additional incentives for houses built so that they are comfortable for B40 residents? Not only comfortable and suitable for the first generation, but also to resolve the problem of becoming a prosperous community for the second and third generations, because when they live in cramped housing, this causes discomfort to them when they grow older and also to the next generations. Item 010200 – Institute of Housing and Local Government Training (I-KPKT). I would like to ask the government, does the government have a policy that all councillors across Malaysia must have specific and compulsory credit hours before they are appointed as councillors? How does the government inform councillors of any changes to acts, enactments, by-laws and guidelines in the states so that they always receive updated laws applicable to their respective district councils, where the best practice is to adopt the same SOP for matters of best practice?

Under Item 02104 – Landscape Research and Conservation. Can the government accept the proposal that a National Landscape Policy be established for each district or sub-district across the country for the construction cost of recreational parks, to ensure they suit the location, identity and history, and that this policy should be read together with the National Heritage Policy? This is because, whenever we propose that the design be built in line with identity or history, the issue that usually arises is cost. So, if possible, we hope this policy is read together so that the cost issue does not arise, but each has its own identity. Next, under Item 02105 – Landscape Management. Can the ministry state the amount of landscape maintenance, taking into account the use of renewable energy? For example, the use of solar- solar at recreational areas and also areas for public use. Under Item 02101 – Public Park Development. Does the government intend to ensure that all public parks, for example in Taiping, which were established long ago, can be established across the whole Parliament? This is because we see today that we lack green areas. So, if we have a policy that mandates, according to targets, that the whole country has parks where we can have family outings. Currently there are only a few places, because we give greater priority to building construction. So, I hope that in the post-COVID-19 situation, many mental stress problems and the like can be resolved by adding public parks like these.

Likewise, under Item 40000 – SPNB, it has been informed to us that a total of 28,472 houses have been built under SPNB. I would like to ask, does the government have a targeted SPNB house distribution policy across all Parliaments throughout Malaysia, and how many houses were specially built for B40? Under Item 00500 – Solid Waste Management. I would like to ask the government, how many incinerators have been built in each state, and will this number be increased in the budget this time, prioritising densely populated areas? For example, in my place in Tumpat, which is a very dense area with a very narrow area. Will it also receive allocations from the government? Under Item 030300 – Community Credit Control Division. How many borrowers are there under the number of licensed ar-rahnu pawnbrokers, and how many borrowers are women? This is because, today, we see that most loan shark cases involving ah long involve women. Also, how many cases have been brought to court? Under Item 030100 – Fire and Rescue. For effective firefighting, how many survival education projects or programmes among the people do I think need to be carried out across ministries? Under Item 030200 – National Housing, regarding Youth Transit Homes. Can these Youth Transit Homes not be occupied once they are married? If these youths refer to men and women, will these houses be placed in the same place? Will they build separate blocks? To distinguish between young men and young women. Next, regarding CCTV. How many towns in Malaysia have CCTV use, and will priority be given to the East Coast for the construction of CCTV in these major towns? Next, regarding— we need an allocation under Item 030500 – Community Welfare for the Pengkalan Kubor community area, which is an international entry point in Kelantan. This is because, at present, the facilities in this community area are very dilapidated. So, if possible, I request additional allocation so that it is in line with— yesterday, the Prime Minister of Thailand officiated another new ferry to come to Pengkalan Kubor. So, I need an additional budget to beautify this KBC area. Next, regarding Item 020100 – Local Government and Item 020500 – Urban Sustainability and Green Environment, for the design and construction of disabled-friendly (OKU) buildings, namely, toilets are now being built, but the area and width of these OKU toilets do not allow wheelchairs to enter. Not all OKU are accompanied by carers. Likewise with the facilities for rem...

Mr ChairmanEN

Honourable Member for Tumpat, are there many more?

In one more minute. Next, regarding gender-responsive policy, namely the construction of more toilets and the location of toilets for women in all public facilities. This is because when women walk around, they usually bring their children with them. So, if possible, we request consideration that from a design perspective, this should be gender-responsive planning for them. Thank you.

Mr ChairmanEN

Good. I invite the Honourable Member for Kalabakan.

Bismillahi Rahmani Rahim. Thank you, Mr Chairman. I go straight to Item 01513 – People's Housing Programme together with Item 01600 – Rental People's Housing Programme. The existence of squatters on land or over water has caused various complex problems, whether in social, economic, environmental or security aspects. Among the problems often associated are the existence of immoral activities, drug addiction crimes, smuggling and illegal immigrants. The existence of squatter houses also causes huge losses to the state government, especially in terms of theft of water supply and also theft of electricity supply. Accordingly, based on squatter statistics for the state of Sabah from January to March 2021, the state Ministry of Local Government and Housing in the District of Tawau, of which the Kalabakan Parliament is part, there are 24 colonies with 3,600 houses and 16,677 residents. Of this total, 14 of these colonies are within the Kalabakan Parliament. Among them are Kampung Menggaris Tunggal, Kampung Bukit Kukusan, Tanjung Batu, Kampung Sri Menanti, Tanjung Batu, Kampung Sri Menanti Hill Top, Kampung Sentosa Hill Top, Kampung Airport Lama, Kampung Tator Hill Top, Kampung Empangan Pasir Putih, Kampung Rejek, Jalan Tengku Osman, Kampung Rawa-rawa, Kampung Sentosa Blok 4, Kampung Teck Guan, Tanjung Batu, Kampung SK Gabungan, Kampung Haji Matahir and Kampung Bombalai. All 14 of these squatter villages are mostly inhabited by illegal foreign immigrants. As a government that is concerned about the welfare of the poorest people, I urge the ministry to increase the number of constructions of the People's Housing Programme and the Rental People's Housing Project, so as to ensure that the comfort and well-being of the people continue to be preserved, considering that at present there are only two PPR in the Kalabakan Parliament, namely PPR Taman Sri Bukit with a capacity of 470 units and PPR Sri Semarak with a capacity of 500 units. Mr Chairman, second, Item 020400 – Urban and Rural Planning (PLANMalaysia). I would like to know, what is the ministry's plan to realise the government's aspiration to make Kalabakan a border town, and what are the main aspects that will be emphasised in achieving this aspiration? Mr Chairman, third, Item 030600 – Housing Planning. I welcome the ministry's efforts to continue the agenda of the previous government in helping young people obtain temporary accommodation through the 1Malaysia Transit Home Programme (RT1M), which is now rebranded as the Madani Youth Home (RBM). I hope that this programme can be extended to all Parliamentary constituencies in the country to help young people obtain comfortable transit homes at reasonable rental rates. Mr Chairman, to conclude my speech, Kalabakan respectfully supports. Thank you.

Thank you. I invite the Honourable Member for Arau.

Mr ChairmanEN

Assalamualaikum warahmatullahi wabarakatuh. Beloved Mr Chairman, the Honourable Minister and the Honourable Members.

I want to speak briefly, because the Honourable Minister came in person and answered; I am sure he is serious about the matters that have been raised. Only, I want to ask under General Objectives, Item 20000, Honourable Minister. I would like to ask the Honourable Minister, the Federal Territories Department, formerly the Ministry of Federal Territories, is it now under the Honourable Minister or under the PM? I see the Honourable Minister has more interest. I am helping the Honourable Minister, I am lobbying, yes. The Honourable Minister is more inclined towards these territorial matters.

I want to speak briefly. The reason the Honourable Minister came in person to answer is that I am sure he is serious about the matters raised. Only, under General Objective, Head 20000, I want to say to the Honourable Minister. I want to ask the Honourable Minister: the Federal Territories Department, formerly the Ministry of Federal Territories, is it now under the Honourable Minister or under the PM? I see that the Honourable Minister's interest is greater. I am helping the Honourable Minister, I am lobbying, yes. The Honourable Minister is more focused on these territorial matters.

So, it is good that the Honourable Member looks after the Federal Territories. However, don't- although the Honourable Member wants to introduce many new things, in truth the old things are given a new brand. There is no problem, because we know that the continuity of this government will carry on, and we want to see how the Ministry of Housing and Local Government (KPKT) can work together with the Federal Territories Department, formerly the Ministry of Federal Territories, to solve the housing problem. So, regarding housing, which the Honourable Member for Kalabakan mentioned, thank you, Honourable Member for Kalabakan, for recognising what the previous government did; we will continue it. This is a good thing, especially for young people. How are all the young people? Young people who are watching our debate, and we know that among the people most troubled in Malaysia are young people. The housing problem. We are very sympathetic. We pity all our friends, and God willing we will fight for the fate of all our friends. So, firstly, Honourable Member, the others among our friends have already touched on it. I want to touch on housing under the Ministry of Education (KPM), which reported that there are 18,740 teacher quarters units unoccupied since March 2023. Recently the Honourable Minister announced that private parties and consultants have been appointed to manage the 18,740 units. Yet we do not need to appoint private parties at all; we can use KPKT. Are the Honourable Members capable or not capable? The Honourable Member is capable, right? KPKT can manage it, or together with other agencies. We have 1.6 million government servants in this country; we must use them. Do not, because 18,740 units are not occupied by people, go and privatise them. I say here, although it is under KPM, I say that KPKT should manage it. Let me give an example, yes: public housing at Jalan U-Thant. For example, that housing was given to the Ministry of Defence (MINDEF) for MINDEF staff, but part of it was opened to civil servants who are not from MINDEF. Similarly, these teacher quarters can be considered in that way. But I think, because many young people who are not government servants exist, they must be considered so that this becomes housing for young people or "bujang madani" housing, which has been mentioned. "Bujang madani" housing has only just been planned, but the housing that this government has already built, we continue. That is number one. So, I am giving this recognition so that KPKT takes over that matter. There is no need to appoint private parties. It is not that the private sector has no work, but it is not necessary, because for the 18,740 units- we have had to give them to the private sector. Secondly, Honourable Member, PR1MA. PR1MA's last appearance in the National Budget Estimates was in 2017. PR1MA is still under the Prime Minister's Department and has allocations. However, now we do not see any allocation arising for PR1MA. So, except in December 2022, when KPKT at that time, at the end of the year, had extra money and gave a little to PR1MA. I ask that PR1MA be given a special allocation because it builds houses for the M40, with respect. So, if they have no special allocation and rely only on capital from sales proceeds, we have a problem in making a turnover, because when PH took over in 2018, PH directed PR1MA to sell houses at prices far below the extraordinary market price, but it was not replenished. Instead, sukuk were issued to solve the problem. Lastly, because this Honourable Member is certainly sensitive, but do not get agitated, Honourable Member, calm down, calm down. The Honourable Member can calm down. I want to ask why HDB was appointed to manage national housing. The National Housing Council has been established, but it has not yet been brought to Parliament regarding the National Housing Council Act. I think, Honourable Member, establish the Council first, and if HDB is to be appointed, we appoint it as a consultant but not directly involved, because housing is a sensitive matter, Honourable Member. It involves demographic and population issues that we cannot disclose to other people.

Therefore, we must shape our housing planning in our own way. I think we do not need to involve outside parties, because we know that the national housing problem has been identified by us; we solve the problems that we have identified, and certainly we can solve the national housing problem. Just now, I went into the Special Chamber and it was answered, but I raise it again, and I believe the Honourable Minister will answer about the justification for why we obtain HDB's services, which in my view we could obtain from other parties in the country. So, thank you. Peace be upon you and the mercy and blessings of God.

Mr ChairmanEN

Good. And upon you peace. Thank you. I invite the Honourable Member for Lubok Antu.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Thank you, Mr Chairman. First, I want to raise the matter of Item 30001 - Construction of Fire and Rescue Department of Malaysia (JBPM) Buildings in Sarawak, as raised by the Honourable Member for Betong. The allocation set for Sarawak is RM490,000, while in Peninsular Malaysia it is RM103.6 million and in Sabah RM10.9 million. Mr Chairman, these allocations will not be able to meet the requests of my other fellow Members of Parliament from Sarawak who have voiced the need to build fire stations in their respective areas, such as Batang Lupar, Betong and Saratok, as in their debates. If this RM490,000 is divided by four, each would get only RM100,000 to build a fire station, and this is unreasonable. I would like to ask the ministry that the Fire and Rescue Department of Malaysia has acquired land measuring 0.54 hectares in Engkilili for the construction of a fire station under the Twelfth Malaysia Plan (RMKe-12). Meanwhile, in the district of Lubok Antu, the ministry has also planned to build a Category E fire station in the Second Rolling Plan in 2020. I would like an explanation of the status of the construction of fire stations in Engkilili and Lubok Antu and when they will be completed? Next...

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

The Honourable Member for Lubok Antu, please.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Oh, the Honourable Member for Batang Lupar, yes, yes.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Since the Honourable Member for Lubok Antu mentioned the name Batang Lupar just now, Mr Chairman, I want to raise a little about this fire station. If we look at the allocation of RM490,000, Mr Chairman, it is very low. In 2021 we only got RM6 million, in 2022 we only got RM4 million, and this year, 2023, Sarawak was only given RM490,000. My constituency of Batang Lupar, which has three new districts, I hope the ministry will look carefully at the need to establish fire stations in these rural areas. Although I know that after last week I went into the Special Chamber and the ministry explained to me the criteria for establishing this fire station, I request that we, as lawmakers in this honourable House, relax the conditions for establishing fire stations in interior areas. If we follow those criteria, small districts or districts in Sarawak will never get the fire stations we have long been wishing for. The Honourable Member for Kluang said just now that 80 years...

Mr ChairmanEN

The Honourable Member for Batang Lupar. Your friend's time is up, Honourable Member for Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

...There are already fire stations in Kluang. Even when they asked for upgrades, the lorries could not enter, but we in Sarawak, Mr Chairman, still do not have fire stations.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Enough, that's enough... [Laughter]

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Enough, enough. Tanjong Manis again.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

I want to touch on this matter. I apologise to the Honourable Member for Lubok Antu for taking up too much time.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Give Tanjong Manis a chance, give Tanjong Manis another chance.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Please, the Honourable Member for Tanjong Manis.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Thank you. Please allow me to interject, Honourable Member for Lubok Antu.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

The Honourable Member for Tanjong Manis, just 10 seconds.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

10 seconds. Okay. Please allow me to interject, Honourable Member for Lubok Antu. Thank you. As informed by the Honourable Members for Batang Lupar and Batang Sadong, it is indeed not enough. The sum of RM490,000 is what we in Sarawak call "kacang potet" (peanuts), very small. Please ask the ministry to look again and increase this amount.

...Tambah.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Even one fire station is not enough. Thank you, Honourable Member for Lubok Antu.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

...To the Ministry, I hope the figure of RM490,000 is a typographical error in the estimates book. Next, I see Item 00100 – Small Projects in Local Authority Areas. Mr Chairman, I have been informed that in 2029 only RM200,000 was allocated to the Lubok Antu District Council. I want to explain that the Lubok Antu District Council has a major role, where they assist in the construction and upgrading of basic infrastructure such as roads, bridges, jetties and retaining walls, with an area of Lubok Antu is up Mr Chairman, 3,092 square kilometres. I hope that this year the allocation for local authorities will be increased to RM300,000. Another matter I want to touch on is, as announced by the Right Honourable Prime Minister, the allocation of RM50 million to repair non-Muslim places of worship. I have also been informed that KPKT has taken over the non-Muslim places of worship from the Ministry of Unity. So I want to ask, is there a mechanism from the ministry to channel the allocation for the repair of these places of worship to the Lubok Antu Parliamentary constituency, which has 11 churches, not including chapels, and eight temples? That is all. Thank you.

Mr ChairmanEN

Alright, thank you. I invite the Honourable Member for Balik Pulau.

Thank you, Mr Chairman, for giving Balik Pulau the opportunity to debate together at the Committee stage. I will go straight to Item 01901 – Local Plans amounting to RM6.1 million. I would like to request details from KPKT: how many- local authorities (PBT) in Malaysia have local plans or local rancangan tempatan that have been gazetted. This is because I know many PBT do not have gazetted local plans. This will cause difficulties in the future. I give an example because this is a problem for many PSPs or people who submit plans and so on. In most PBTs, if you only want to submit a plan, it takes three months for the Development Order (DO) to be approved. Then after three months, another three months for the building plan. So, for people who want to carry out any development, it takes too long in Malaysia, due to one of the reasons, that there is no local plan in most of our local authorities (PBT). In neighbouring countries it takes only two weeks to submit a plan to obtain the DO and building plan. So, why must we take such a long time? I hope KPKT has the responsibility to resolve the problem that has long existed in these PBTs, because KPKT has the power to resolve this problem. I also want to move on to Item 02101 – Development of Public Parks amounting to RM53 million. Under the Local Government Act, when we submit a plan, we only need 10 per cent open space for a development scheme. In my view, 10 per cent is a small amount because we know that public parks or recreational parks or open spaces are important for physical development and also for children. This is an opportunity for them to sweat, play and enjoy recreation. It's a green lung for a development. So, I hope KPKT will review the development of public parks so that more are provided, especially in big cities, because with this imbalanced development we will lose several green lungs here. I also want to draw the Minister's attention: if one goes to foreign countries, their parks in the middle of cities, and I will not give examples, there are many. Their parks have features of art and so on. Likewise in cities, especially in certain cities in France, they set aside one per cent of the total cost of the whole development to be allocated to art elements. So when there is a building, there are artistic elements. Now when they build a building it is like a bird's box, there is no art. So, these architects study at high levels, they should produce something with artistic elements. Now we go to a park- this residential area is lifeless, there is no soul, no artistic spirit in it. So, we see a void there. I have no other time, but I want to go straight to Item 04001 – Maintenance of Housing amounting to RM90.4 million. I have already raised it in the policy speech regarding the management of PPR. Most PPR have problems in terms of management, facilities and public amenities, not to mention social problems and so on- lifts are broken. What are the specific steps? Please elaborate what form will be used with the RM90 million to solve several maintenance problems in PPR. I think my time is up. Thank you.

Mr ChairmanEN

I will give the last opportunity, the last debater. The Honourable Member for Bakri.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you to Mr Chairman. I want to refer to Head B.43, Item 030100 – Fire and Rescue Services, where I ask the ministry to provide an explanation on whether the department or ministry has any plans to review the salary structure and benefits for fire personnel. I raise this issue because I was interested in a report on 27 January where the Director-General of the Fire and Rescue Department of Malaysia said that there are 600 vacancies for Grade KB19 still waiting to be filled. Is this because of salary- when I checked again for this Grade KB19, the minimum salary is RM1,360 and the maximum RM4,052. But we must understand that the work of fire personnel covers everything. Catching snakes- not only rescuing or extinguishing fires. But if there are snakes, cats and dogs too, they must go. It can be said that the risk to these fire personnel is high, but is the salary given to them sufficient for such a heavy duty. Next, I want to move on to the item- now, P.43, Item 30000. I am rather embarrassed to say this after hearing the complaints from the Honourable Members from Sarawak, but I have to say it anyway, regarding the construction of fire buildings in Peninsular Malaysia. Mr Chairman, the development of the Muar Furniture Park in Bakri is expected to further boost economic performance around the Muar District. In this development, covering 400 hectares, it is expected to attract investment of more than RM1 billion. A fire station has been planned here. Because we know that the furniture industry is a type of industry with a very high fire risk. A Grade "A" fire station is very much needed to ensure that if any fire occurs, the fire brigade can reach the fire location in the shortest possible time.

Tuan Tan Hong PinDAP · PHBakriEN

I hope the fire facilities can be provided before the entire Muar Furniture Park project is completed. So, I request that the ministry, especially the Fire and Rescue Department of Malaysia, give priority to building a fire station as planned at the Muar Furniture Park. [The Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] Next, Mr Chairman– Not yet, yes. I want to draw attention. Why all this laughing. [Laughter] I want to draw the ministry's attention to Item 00500 – Solid Waste Management. Amounting to RM245,968,800. Here there is an advertisement for a tender offer in 2022, namely the Project for the Construction of a Solid Waste Transfer Station in Muar, Johor. I want to ask, what is the latest development regarding this project? Next, I ask that the ministry provide an explanation of what is the latest direction of the government regarding solid waste management issues and policies. Is the Solid Waste Management Action Plan 2015–2020 drawn up by the previous administration still being used? Mr Chairman, among the essence of the action plan I just mentioned is centralised solid waste management, namely a mega facility will be built and solid wastes or rubbish from several local authorities (PBT) will be sent to that facility?

Tuan Tan Hong PinDAP · PHBakriEN

I will give an example from Johor: solid waste management has been divided into three regions, namely the northern region at Bukit Payung, the southern region at Seelong, and the eastern region at Mersing. The problem- I see that the facility or technology to be used is an incinerator, better known or rebranded as waste to energy (WTE). I do not intend to discuss issues or environmental impacts in this matter, but we must understand that when we build an incinerator, we must...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Tan Hong PinDAP · PHBakriEN

A little more. We must provide a guarantee of the volume, where we must supply a large amount of input so that this incinerator can operate smoothly. I see that this is contrary to...

Mr Chairman (Puan Alice Lau Kiong Yieng)

Ringkaskan, ringkaskan.

Tuan Tan Hong PinDAP · PHBakriEN

...the goals and targets we have to reduce and minimise solid waste. So, I hope the ministry can provide an explanation regarding this issue.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Terima kasih.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Mr Chairman. [Laughter]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Now I invite the Honourable Minister to respond within 20 minutes.

Tuan Nga Kor MingDAP · PHMinister of Local Government Development · Teluk IntanEN

Greetings of Unity and greetings of Malaysia Madani, Mr Chairman, Honourable Members. First, I would like to thank all 16 Honourable Members who debated matters relating to the 2023 Budget under the Ministry of Housing and Local Government (KPKT), which I have summarised into five main areas: (i) local government; (ii) housing; (iii) fire services; (iv) solid waste management; and (v) town and village planning. I will begin my reply with a pantun: Walking about inside the mosquito net, Searching for herbs, roots and wood; The Honourable Member's question pierces the heart, But KPKT answers without hesitation, without shame. [Applause] Honourable Members, I will start with the Honourable Member from Sarawak, the Honourable Member for Betong. The Honourable Member for Betong has raised the issue of how many PPR projects have been approved in Sarawak, particularly in the Betong area? For the information of Honourable Members, there are 10 PPR projects in the state of Sarawak comprising 4,791 housing units that have been completed, and one project under construction comprising 461 housing units. At present, there are still plans for PPR development in the Betong district. However, starting in 2023, KPKT will give priority to PPR projects for state governments that provide land free of charge or at a nominal land premium rate. The Honourable Member for Betong also raised the budget for small projects under BP1.

Tuan Nga Kor MingDAP · PHMinister of Local Government Development · Teluk IntanEN

BP1 has seen a significant increase, particularly as rural PPT are eagerly hoping for allocations to upgrade infrastructure. For the information of this august House, the BP1 allocation for 2022 for the state of Sarawak totalled RM19.77 million. Meanwhile, the BP1 allocation for the Betong District Council is RM1.26 million. For this year, each PBT has been allocated RM2 million for BP1, subject to applications and project priorities. However, for the information of this august House, in order to safeguard the welfare of the people, the Local Government Department has indeed obtained a significant increase in terms of small projects including drain maintenance, construction of multipurpose halls and other basic services. The total allocation obtained by the Local Government Department has increased from RM431 million to RM560 million. An increase of 30 per cent or RM129 million. Next, the Honourable Member for Kalabakan. Having covered Sarawak, I will answer for the Honourable Member from Sabah. The issue of PPR in Sabah, particularly Kalabakan, as well as new PPR and Rumah Belia Madani. For the information of this august House, the implementation of PPR projects in Sabah so far is the largest in number, with a total of 38 projects. Of this total, 34 projects have been completed comprising 23,509 units, while four other projects are under construction comprising 2,590 units. Overall, the number of completed PPR in Sabah accounts for 21.4 per cent of the number of PPR that have been built across the country. For the information of Honourable Members, there are two PPR projects that have been completed in the Kalabakan Parliamentary constituency, namely PPR Seri Semarak, Tawau with 470 units and PPR Merotai, Tawau with 470 units. Under the Third Rolling Plan of the Twelfth Malaysia Plan, KPKT is reviewing applications from every state. However, KPKT will give priority to PPR projects to any state government that provides land free of charge or at a nominal premium rate. KPKT is also planning the construction of Rumah Belia Madani, where the RBM initiatives aim to provide transit housing for youths aged 35 and below to occupy such homes for a period considered sufficient for them to strengthen their financial position and subsequently own their own homes. The rent they pay may be considered part of the deposit money for purchasing their own homes. KPKT will also study the need to expand the Rumah Belia Madani initiative nationwide. The Honourable Member for Batu Pahat. From Sarawak to Sabah, I now go to Johor. The Honourable Member for Batu Pahat has raised the question of what small BP1 programmes there are and requested details? What is the cost of each programme and which PBT are involved?

Tuan Nga Kor MingDAP · PHMinister of Local Government Development · Teluk IntanEN

The scope of BP1 projects, for the information of Honourable Members, covers upgrading public infrastructure such as roads, drains, street lights; public facilities including halls, toilets and bus shelters; socio-economic projects including stalls, business spaces; and security including CCTV. The allocation considered for each project shall not exceed RM500 thousand. The estimated allocation for each PBT is RM2 million and for the 150 PBT nationwide, and where BP1, the ceiling so far is RM1 million. For the information of Honourable Members, for this year, a special allocation of RM30 million will be allocated for the maintenance of PBT drainage and drains. PBT in need may submit applications for KPKT's consideration. The Honourable Member for Batu Pahat also raised whether the twice-weekly collection schedule is appropriate or whether it will be increased regarding– Collection services are uniform and in line with developed countries, namely through the concept of two-plus-one (2+1) collection. The frequency of two-plus-one solid waste collection will continue until the end of the concession agreement in 2033.

Tuan Nga Kor MingDAP · PHMinister of Local Government Development · Teluk IntanEN

Under the existing privatisation contract, KPKT always ensures that the machinery complies with KPIs, and penalties will be imposed if the concession company does not meet the specified machinery criteria. Concession companies are also required to replace machinery with new ones if it is no longer suitable for use. The Ministry is always striving to increase solid waste segregation by building recycling centres. For the information of the Honourable Member, we have built 32 drive-through recycling centres for this purpose. The national recycling rate has also increased and the Ministry aims to achieve a 40 per cent national recycling rate by 2025. Next, for the information of the Honourable Member for Batu Pahat too, the allocation in 2023 for lift maintenance and painting. This year, RM9.4 million, or a significant increase of 26 per cent, has been allocated for lift maintenance and painting of old flat buildings. This allocation is for maintenance projects across the country, except for the Federal Territory of Kuala Lumpur, which includes RM44.4 million for the Malaysia Housing Maintenance Fund (TPPM) involving 74 projects. Another RM46 million will be allocated for the Housing Maintenance Programme (PPP) involving another 48 projects, targeting a total of 35,000 people to benefit. The scope of work for TPPM and PPP is as follows: (i) repairing or painting lifts; (ii) repairing or replacing water tanks and reticulation systems; (iii) repairing or replacing sanitary pipes; (iv) repairing or replacing roofs; (v) repairing or replacing staircases and handrails; (vi) repainting buildings and common property every 10 years; (vii) rewiring and electrical works; (viii) repairing or replacing public facilities involving common property; (ix) replacing or building fences around development areas; (x) repair of slopes within development areas; and (xi) repairing or building infrastructure in low-cost strata residential areas including an anti-vandalism lift system. This increase in allocation is further supplemented by a special allocation for a new initiative, namely RM50 million will be allocated this year, and we aim to replace or substitute at least 70 new lifts for old flat houses that have long been neglected. For the information of this august House, this increase in allocation also takes into account the concern of the present Unity Government in assisting low-cost and lower-medium-cost high-rise housing that does not have or has failed to establish a Joint Management Body (JMB) and Management Corporation (MC) for repair and maintenance in ensuring sustainable and liveable housing. The method of application for this allocation is through the Commissioner of Buildings (COB), local authorities (PBT) namely city councils, city halls, municipal councils, district councils and also Members of Parliament in this august House. The Ministry will give due consideration. For the information of the Honourable Member for Batu Pahat too, will solid waste facilities be built in every PBT? For the information of Honourable Members, solid waste facilities will be developed based on a regional, zonal and integrated concept. In this regard, several

Tuan Nga Kor MingDAP · PHMinister of Local Government Development · Teluk IntanEN

PBT will share the same solid waste management facilities to overcome the following challenges. First, difficulty in obtaining suitable land. Not everyone wants to live beside a sanitary landfill. Second, high management and construction costs. Third, reducing nuisance to surrounding residents and environmental pollution. For example, for the state of Johor, the Bukit Payong Sanitary Landfill (TPSPS), Batu Pahat for solid waste of northern Johor. TPS Seelong for southern Johor and TPS Mersing for eastern Johor. Mr Chairman, apart from that, is there a facility...

Tuan Tan Hong PinDAP · PHBakriEN

Honourable Minister, Bakri.

Tuan Nga Kor MingDAP · PHTeluk Intan

Ya.

Tuan Tan Hong PinDAP · PHBakriEN

Honourable Minister, earlier you mentioned the constraints we face, including the issue of land. So, actually, the reason I say this is that I see the action plan that has been drawn up is roughly 10 years old. As time has changed, new technology has emerged. Does the department keep up with the latest developments and the latest technology to solve the problems we faced before and now do not need? Perhaps go to the approach mentioned by the Honourable Minister just now.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Thank you, Honourable Bakri. Although I am now answering the question from the Honourable Member for Batu Pahat, I have included yours too. The KPKT Ministry always keeps up with the latest developments, including adaptation of the latest technology. I give an example: any WTE technology to be used in our country must have a track record of at least 10 years in which it is guaranteed to be safe, with no toxic pollution into the air, only then can it be considered. This is among the safety measures being and to be undertaken by KPKT. Therefore, Honourable Bakri, do not worry. Is there basic facilities; the Honourable Member for Batu Pahat has also asked whether the basic facilities in PPR will be upgraded? At present, the basic facilities existing within the PPR that have been provided include surau, kindergartens, stalls, child care centres and community halls. These basic facilities have been provided based on the number of housing units and households occupying those homes. The ratio for one shophouse is for every 100 housing units. This number is taken into account to ensure that the facility tenants obtain a reasonable profit while providing the best service to residents. At present, basic facilities in PPR are also taken into account in the annual current allocation estimate for their repair and maintenance to ensure these basic facilities operate optimally. Another point, where the Honourable Member for Batu Pahat has also raised how many of the B40 group benefit from the PPR programme. Up to 31 January this year, there are 159 projects comprising 99,296 PPR housing units that have been completed. A total of 24 projects are under construction, comprising 9,737 units, while 16 other projects involving 6,224 housing units are at the planning stage. This will benefit 24,896 households. Next, I answer from Johor to the Federal Territory. The Honourable Member for Wangsa Maju has raised housing maintenance or in Kuala Lumpur, there are 178 low-cost projects. The Honourable Member has raised that if 30 per cent of lifts and water tanks need to be replaced, then the budget is only enough for – RM50 million is only enough for 120 lifts. For the information of the Honourable Member, KPKT will make plans for maintenance and replacement of all dilapidated and old lifts, in phases according to priority order. For the information of the Honourable Member, RM50 million is a

Tuan Nga Kor MingDAP · PHTeluk IntanEN

special allocation that will be channelled under the KPKT allocation for maintenance and replacement of lifts specifically for PPR across the country.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Taking into account the cost of replacing one lift unit at approximately RM400,000 to RM600,000, then with RM50 million, it is estimated that 83 lift units in PPR can be replaced. The selection of lift repairs will take into account lifts that have not been maintained for a long time and are replaced, especially those that have exceeded 10 years. In addition, the government has also approved maintenance allocations across the country amounting to RM90.4 million. As I said earlier, for TTPM and PPP for various works that we will carry out. Next, I will go to the state of Selangor. The Honourable Member for Kuala Langat has raised that Kuala Langat is part of the Greater Klang Valley. Kuala Langat is an extensive peat area. The fire station facilities are small, limited, have no skylift and need to be repaired. For the information of the Honourable Member, the Ministry, through the Fire and Rescue Department of Malaysia, always pays attention to the need to upgrade the logistics and assets of fire stations nationwide. At present, the Ministry is in the procurement process for 150 Compact Fire Rescue Tenders, compact-sized vehicles to be strategically placed at fire stations across all states starting at the end of this year too. The Ministry also plans to apply for additional four-wheel-drive vehicles in the Fourth Rolling Plan next year, of the Twelfth Malaysia Plan, because of their important function as support vehicles in fire and enforcement operations. However, this plan is subject to approval from the central agency and the current financial allocation capacity. For the information of this august House, the Fire and Rescue Department of Malaysia and KPKT will work together with the Ministry of Health, to launch another new initiative towards the end of this year. We will establish an air ambulance where helicopters owned by the Fire and Rescue Department of Malaysia can be used to rescue victims in remote areas including accident areas on highways. If this is blessed and realised, then it will save at least RM15 million a year. In a five-year term, we can save RM75 million because of the previous government's practice, where it outsourced to the private sector. So, that money was RM20 million a year. Now the fire department has taken over, only RM5 million a year. This is another initiative towards Malaysia Madani. Mr Chairman, the Ministry – the Honourable Member for Kuala Langat just now, I have already answered this. The Honourable Member for Kluang has raised the high solid waste management expenditure and the contribution of PBT and others...

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Member, Honourable Member, may I interject briefly?

Tuan Nga Kor MingDAP · PHTeluk IntanEN

I will get to Tanjong Piai. Don't worry, be patient. The high allocation is indeed due to ... [Inaudible] from operating expenditure to development expenditure. As for last year's expenditure, the total expenditure on solid waste management and public cleansing for the seven states managed by SWCorp has in fact reached nearly RM2 billion, of which RM1.32 billion came from the Federal Government and RM680 million from PBT contributions. The government also provides RM10 million for PBT that are unable to afford it, namely those with annual revenue of less than RM10 million a year. Up to March, which is this month, the outstanding debt owed by PBT to SWCorp totals RM538.26 million, which is eight per cent of the total claims.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu Selangor

[Bangun]

Tuan Nga Kor MingDAP · PHTeluk IntanEN

The total cost of solid waste for each PBT varies according to size. Based on the Ministry's records, the total expenditure for solid waste management is 30 to 80 per cent of PBT revenue. Based on the concession agreement, solid waste collection payments are according to premises, whether landed or high-rise. However, the Ministry is prepared to review this method as well as the proposals of the Honourable Member for Kluang in the review of the concession agreement as early as possible in 2025.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Honourable Minister.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

This is because the agreement will end in 2033.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Honourable Minister.

Puan Wong Shu QiDAP · PHKluangEN

Honourable Minister.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

May I ask for injury time?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Five more minutes.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Okay, five more minutes.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Honourable Minister.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Honourable Member for Tanjong Piai, please go ahead.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Minister, is it me?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Yes, Honourable Member for Tanjong Piai.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Tanjong Piai, is it?

Mr Chairman (Puan Alice Lau Kiong Yieng)

Ya.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Minister, earlier I asked about the Fire and Rescue Department, which for them, especially applicants seeking a licence or building CCC, takes a long time, up to a year or more, because they are waiting for a response from the Fire and Rescue Department. So, I consider this important because there are many complaints. Previously there could be a one-stop centre, perhaps with just one meeting all at once. But nowadays, the fire department asks for a form from the Fire and Rescue Department and sometimes does not receive that form, so it takes a very long time. So, this procedure can be improved quite a bit.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu Selangor

Mohon laluan.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Thank you to the Honourable Member for Tanjong Piai.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Honourable Minister, may I have the floor?

Tuan Nga Kor MingDAP · PHTeluk IntanEN

And the Honourable Member for Kluang, who is concerned. Honourable Member for Kluang, okay.

Puan Wong Shu QiDAP · PHKluangEN

Yes, thank you, Minister.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Hulu Selangor, Hulu Selangor.

Puan Wong Shu QiDAP · PHKluangEN

Thank you for the very comprehensive answer just now. However, I request, if possible, that the ministry prepare a written answer listing every local authority (PBT) that still owes payment for that solid waste,

Puan Wong Shu QiDAP · PHKluangEN

who are they? I mean, which PBT and the amount of arrears they still have, so that we know which PBT truly lacks the capacity and how serious this problem is. Otherwise, the public will not know that our PBTs owe a lot just for disposing of rubbish. Thank you.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Thank you, Honourable Minister. Hulu Selangor asked several questions just now. I hope there will be answers from the Minister.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

I will answer one by one first. The Honourable Member for Tanjong Piai. Thank you to the Honourable Member for his concern. For the information of the Honourable Member, the Fire and Rescue Department of Malaysia has implemented several measures to improve the delivery service, with permission, in relation to applications for business licences. First, the exemption of JPPN support for several types of business premises, such as: (i) businesses carried out on the ground floor; (ii) premises that already have a fire certificate; and (iii) small businesses. All of these are exempted, no longer needed. Second, as the Honourable Member said, good news for the Honourable Member. The authority to support business licences has been given to the zone chief. There is no longer a need to refer to the state fire headquarters. Third, JPPN is developing...

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Member, excuse me for a moment.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Is there more? I have not yet...

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

When will it be implemented? I want to know.

Tuan Nga Kor MingDAP · PHTeluk Intan

Ya.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Because at present, the problem still persists. When will it be enforced?

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Perhaps the Honourable Member has specific cases. I welcome them; please bring them to my office. I will act on them immediately. Honourable Member, JPPN is also developing an online system to enable licence applications to be made online. This system is launched– began to be used in September this year. Online is also possible; there is no need to go to the fire office to apply. This is among the initiatives of Malaysia Madani. Meanwhile, for applications related to CCC inspections, the Fire and Rescue Department of Malaysia has set a KPI that the result of the inspection, whether passed or rejected, must be issued within five days. In addition, JPPN has also issued a deemed clause that if there is no information within 14 days after the inspection, the principal submitting person (PSP) may issue the CCC without needing to obtain support from the Fire and Rescue Department of Malaysia. This is another proactive step to speed up the business process and also to boost the economy of this country. At the same time, JPPN has submitted a restructuring proposal to the central agency, including an increase in the number of officers for premises purposes. Actually, Mr Chairman, if I were to answer in full, it would take another hour and a half. But those I did not have time to answer, including from my colleague, the Honourable Member for Hulu Selangor, I will provide written answers so that...

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Honourable Minister, regarding the question of the Honourable Member for Lubok Antu on the number of fire buildings in Sarawak, only RM490,000. Can the Honourable Minister please explain? Thank you.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Yes, yes. Actually, the reason development allocation in Sarawak has decreased is that the allocation is only for two projects this year compared to five projects last year. Three fire stations have been successfully completed by us, namely PBB Belaga, Balai Bomba Bintango, Balai Bomba Sibu Jaya, and the most recent, Balai Bomba Asia Jaya in Sarawak, will be completed in the near future. Actually, there are many more fire stations, including in Sabah and Sarawak, being planned.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Honourable Minister. Honourable Minister.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu Selangor

[Bangun]

Tuan Nga Kor MingDAP · PHTeluk IntanEN

This year we have 34 of them, where in conjunction with the first 100 days of the Unity Government, the ministry has completed seven new fire stations and eight new fire stations will be fully operational by the end of this year.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Honourable Minister.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Next month, before Hari Raya Aidilfitri, Balai Bomba Manjalela will be completed. [Applause]

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Honourable Minister.

Tuan Nga Kor MingDAP · PHTeluk IntanEN

Then, we will go to Sabah and Sarawak.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Honourable Minister. May I give a suggestion, Honourable Minister? Honourable Minister.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Honourable Minister. May I give a suggestion from Sarawak?

Tuan Nga Kor MingDAP · PHTeluk IntanEN

All suggestions, views and criticisms, I welcome. However, time is very limited. Let me— as I know that if time runs short, then no one will be able to return home by the end of tonight. I will begin with a pantun and also end with a pantun. Mr Chairman, honourable and esteemed colleagues, the Honourable Members. Many are the months, None as noble as the fasting month, Compassion as our guide, Malaysia Madani, the direction for building the nation. Thank you. Happy welcoming the month of Ramadan.

Honourable Member. Clarification.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Arau, please sit down. Please sit down.

Penjelasan.

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Please sit down. No need to respond.

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Okay, do not make noise.

Is Mr Chairman asking me to sit down?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Honourable Member for Arau, sit down, Honourable Member for Arau, sit down.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members, the question is that the sum of RM1,774,905,500 for Head B.43, Operating Expenditure Estimates 2023, forming part of the Schedule, be approved. [Question put and agreed to] [Head B.43 ordered to stand part of the Schedule]

Mr Chairman. Point of order. Standing Order 36(6). I heard while Mr Chairman asked, the Honourable Member for Jelutong answered just now. He answered "Tiada" (None). So, he misled the House. Standing Order 36(12).

That is enough, Honourable Member for Arau. That is enough, Honourable Member for Arau.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Standing Order 36(6) does not mislead the House.

Tuan Chong ZheminDAP · PHKamparEN

Honourable Member for Arau. Honourable Member for Arau. Standing Order 36(6) does not mislead. That is a point of order...

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Kampar, please sit down. Okay, Honourable Member for Arau. Standing Order 36(6) does not mislead the House.

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Arau, do not mislead the House. Please sit down. Please sit down! Sit down! Honourable Member for Arau. Sit down first, sit down first. Honourable Members, the question is that the expenditure under Head P.43, Development Expenditure Estimates 2023, be approved. [Question put and agreed to] [Head P.43 ordered to stand part of the Estimates]

Bill — Supply Bill 2023 and Development Estimates Motion 2023 Committee — Head B.25 [Schedule] – Head P.25 [Development Estimates 2023] –Bill

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Supply Head B.25 and Development Head P.25 under the Ministry of Home Affairs and Cost of Living are open for debate. The list of debaters for today is the Honourable Member for Kuala Selangor, the Honourable Member for Hulu Terengganu, the Honourable Member for Rasah, the Honourable Member for Pengkalan Chepa, the Honourable Member for Miri, the Honourable Member for Kangar, the Honourable Member for Batang Sadong, the Honourable Member for Parit, the Honourable Member for Bakri, the Honourable Member for Temerloh, the Honourable Member for Kalabakan, the Honourable Member for Gerik, the Honourable Member for Ampang, the Honourable Member for Padang Terap, the Honourable Member for Kampar, the Honourable Member for Tumpat, the Honourable Member for Batu, the Honourable Member for Arau and the Honourable Member for Sandakan. I invite the Honourable Member for Kuala Selangor.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, Mr Chairman. Assalamualaikum warahmatullahi wabarakatuh and good day to all Members of Parliament in this Dewan Rakyat. I will begin by referring to Head P.25 and Item 13006 – Intellectual Property Corporation of Malaysia (MyIPO): Development. It is said that the wealth of a nation is measured by its abundance or poverty in terms of its intellectual property, with permission. Stored within this intellectual property, or intellectual property, will be determined the capacity and potential to develop new products–

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

products and new services (good sense services), with permission, in an economy and the development activities of a country. Item 13006 – Intellectual Property Corporation of Malaysia (MyIPO) is the body that stores all intellectual property in this country. For everyone's information, what is said to be registered in the MyIPO database are related activities, whether patented, copyrighted or trademarked, or branded more specifically as certain products or services. Mr Chairman, once an idea that was previously a secret has been registered, it becomes something that can be dissected, accessed or obtained its achievements. Thus, it becomes something known to the public, even though originally everything was kept secret. Therefore, if we observe, when Apple released the iPhone X, other manufacturers also created similar ones. But not the same. Same but not identical. The offence lies in copying other designs. Hence, there must be innovation, there must be "bidaah" and so on. Creativity to produce similar products and services but not identical. My question, Mr Chairman, what is the total amount of intellectual property that has been registered in this country? Over the past ten years, or more precisely up to now, how many creations have our citizens produced? Because outsiders benefit more since the intellectual property registration process is much cheaper in our country compared to America, Europe and so on. What is the amount? What are the types? Whether patents, trademarks, copyrights and so on? My next question is what is the role of MyIPO? Its importance is not merely to protect ideas, protect your ideas, with permission, which protects our ideas, but more importantly is to develop, to develop those ideas. Mr Chairman, it seems I have time for only this one topic. So, that is what I would like to know, yes. MyIPO must go beyond merely protecting but must actually be developed. The second point or Item that I want to address is under Head P.25 Item 00211 – Control of Goods and Subsidies. Mr Chairman, I will mention this matter which is related to the control of goods prices and subsidies. We are still waiting for the targeted subsidy, which if the government is able to implement it, would save RM40 billion. Whereas what is spent is nearly double, that is RM80 billion.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Mr Chairman, if I wish to mention or— It is already over, the time has ended. This is what we observe, Mr Chairman. In short, I want to know the government's readiness to table this, especially in the provision of RON95 subsidy? Subsidy is a fiscal tool in terms of redistributing wealth. That means, those who are less well-off or the B40 group receive assistance—can enjoy the prosperity or well-being of the country through subsidies. Thus, targeted subsidies need to be expedited because they will be the most intelligent, the most cost-saving and the most effective way to simultaneously reduce expenditure. Finally, if I am permitted, it is...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Datuk Seri Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

It is finished, yes.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up. Thank you.

Datuk Seri Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Alright, thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you. I invite the Honourable Member for Hulu Terengganu.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and good afternoon. Thank you, Mr Chairman, for giving me the opportunity. Allow me to refer to Item 010300 – Integrity. I seek an explanation as to whether the budget amount of RM1.45 million for the Integrity Strengthening Programme, especially the Organisational Anti-Corruption Plan (OACP) in the ministry, can be implemented? This is because I see that KPDN is rather behind and is breaching what was promised by the Right Honourable Prime Minister, namely not appointing chairmen or GLCs, whose chairmen are from political figures, whereas the new chairman of SSM is a political figure. I understand he was the former political secretary to the Deputy President of Amanah. Then several other chairmen were also raised by the Chairman of BERSIH, the electoral reform group who doubt or object to political appointments, namely the Chairman of MARA, the Chairman of FELCRA, the Chairman of ITBM and also the Chairman of MyCreative Ventures. So, I seek an explanation. Secondly, Mr Chairman, Item 041100 – Buy Malaysia Campaign, whose allocation this year has been reduced by 50 per cent from RM20 million to RM10 million. We understand that KBBM is a platform used by local entrepreneurs and SMEs to market their goods in the large centres or in big malls. Without assistance from the government, we are sure they are unable to enter such places. Mr Chairman, apart from that, I would also like to refer to— thank you to the government for increasing the allocation under Item 040400 – Cooking Oil Price Stabilisation Scheme Programme (COSS). The question is, where is the allocation channelled? So, if it is channelled to increase the subsidy or the amount released so far, that is a good allocation or effort and I hope it can be explained by the Honourable Deputy Minister. Next, Mr Chairman, Item 020400 – Enforcement. A total of RM35.9 million has been allocated for this year. In fact, enforcement is the backbone of KPDN because our largest number of officers are in the enforcement division. Their duties are important to ensure domestic trade always progresses, consumer rights are protected, and at the same time, there is no leakage or misuse of government subsidies. I have brought a motion to your side, Mr Chairman, but until now I have not been given any fatwa regarding the leakage or diversion of diesel subsidies amounting to RM10 billion last year. So, I ask that in my speech on that day, for details to be provided. How much— what, where did the leakage occur, and the answer contradicts what was answered by the Honourable Minister. Here I see that enforcement is important. So, can this RM35.9 million overcome the problem of diesel subsidy leakage? This is because what I understand from the ministry is that leakage in KPDN did not even reach RM1 billion last year. So, we ask that the Right Honourable Minister of Finance, like the people of Terengganu say, "Jangan lebong atas darat kering" (Don't bluff on dry land). Don't bluff on the dry land. Mr Chairman, RM10 billion is a large amount, which is more than RM800 million a month. Until now, no information has been received. Mr Chairman, next, Item 020200 – Distribution and Business Trade. A clear and large reduction. From RM19.7 million in 2022, only RM6.5 million remains for this year. So, why was it reduced? Is it not important, and what is the justification for the reduction? I think that is all Hulu Terengganu wishes to raise today. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Hulu Terengganu. I invite the Honourable Member for Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Chairman, for the opportunity given to me to take part in the Committee stage on the Ministry of Domestic Trade and Cost of Living. The first point I wish to raise under Supply 25 is Item 020600 – Malaysia Competition Commission (MyCC). As in the previous year, RM10 million has been allocated. I— I refer to last year. In August last year, five chicken-feed manufacturing companies were involved in what we know as an anti-competitive agreement, or a cartel agreement, at that time. I want to ask, after that incident, is there no need? Is there no need to increase the allocation? So, why is the allocation the same? I understand that a representative of the ministry under the leadership of the Minister, who had previously gone to London at the end of September to engage, to hold engagement with the Competition and Markets Authority (CMA) in the UK. So, I want to know what the status is after that meeting, which enables us to improve or enables our MyCC to be more effective. The second point I wish to mention is under Item 040600 – General Wheat Flour Subsidy of RM40 million, as in the previous year. I want to ask, based on the actual subsidy figures for 2021 and 2022, is this RM40 million sufficient? I feel this is a very important question because flour is a very basic item for Malaysians. Next, under Item 040300 – Emoluments of Price Monitoring Officers (PPH) of RM41 million, as before. I want to ask the Honourable Deputy Minister who will reply later. Of this RM41 million, the allowance is for how many people? For how long are their appointments? Will the contracts of those who were appointed previously be continued, and when will they end? What about the appointments and the number of persons involved, and their role in ensuring that prices in the market, namely basic goods, are always suitable for consumers? Next, Item 041100 – Buy Malaysian Goods Campaign. Last year it was RM20 million; why was it reduced to RM10 million? I want to say, we launched the Buy Malaysian Goods Campaign. First, because of patriotic spirit. Second, to prevent cash flowing out of our country so that the money stays within our country. This is very important. I want the Madani Government today to take lessons and learn from the previous year when the Keluarga Malaysia government, at that time, whose T-shirts—if the Honourable Members in this House from last year still remember—the Keluarga Malaysia T-shirts given to Members of Parliament were made in Bangladesh. So, we must not repeat such a mistake. We must ensure that all government procurement buys Malaysian-made goods. That, for me, is very important. Next, regarding the RM100 million. The Honourable Minister of KPDN once said that RM100 million was allocated for Jualan Rahmah in all 222 parliamentary constituencies. I do not see any details of it. I seek an explanation from the Honourable Deputy Minister as to where that RM100 million is. We welcome the allocation of RM100 million. Only, where is the RM100 million allocation placed? Is it under this ministry, or perhaps under the Ministry of Finance or another ministry? For me it is very important and needs to be disbursed as quickly as possible, because in one week we will be celebrating the coming of Ramadan, and the local retail market will be busy at that time. The last point I wish to mention is Item 040400 – Cooking Oil Price Stabilisation Scheme Programme (COSS). One, I welcome it if, in the previous years, RM400 million was increased to RM500 million. An increase of RM100 million.

Tuan Cha Kee ChinDAP · PHRasahEN

I welcome this effort and the commitment of the government. Only, I want to give one fact, which is a fact that was once given by the Ninth Prime Minister last year. He said that in 2020, RM500 million was used for this purpose, cooking oil subsidy. In 2021, RM2.2 billion, and in 2022, at that time, nearly RM4 billion. So, is this RM500 million sufficient for cooking oil subsidy this year? I want to ask. If not, we should give more. Because I want to repeat my proposal to the government before this, and I repeat it this time that 60,000 metric tonnes of packaged subsidised cooking oil in the market each month at this time is not enough for the local market, because we must take into account not only the B40 and M40 groups, but also small traders, hawkers and retailers. They too are facing very high cost conditions, especially traders involved with Menu Rahmah. We want them to sell cheaply so as not to burden consumers. We must—the government has a responsibility to supply raw materials or cooking ingredients at a cheaper price. So, I urge the government to reconsider the 60,000 metric tonnes each month. I hope it can be increased to at least 70,000 or 75,000 metric tonnes each month, so that everyone involved and affected by the high cost of living does not need to spend more to buy cooking oil in those bottles. I apologise to Mr Chairman. I know the time has run over by one minute. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Rasah. I invite the Honourable Pengkalan Chepa.

Datuk Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Bismillahi Rahmani Rahim. Mr Chairman, Item 010000 – Management. The allocation for Item 010200 – Policy and Strategic Planning records a cost reduction this year of RM2,199,700. What medium-term and long-term plans will the government draft to encourage domestic trade and consumerism? We know that the Menu Rahmah initiative brought by KPDN is a short-term solution which attracts quick interest because of its cheap prices, and the pioneering of this initiative came from the people, from the traders. If we can check the list of shops offering Menu Rahmah, indeed it is an initiative from the traders. However, this initiative, as the Honourable Rasah just mentioned, does not solve the core issue, namely the main issue: inflation of raw material prices, the country's dependence on imported materials, and also the impact of climate change. We have already heard many complaints about raw material prices that are not competitive at the level of the people and also the traders. I propose to the government— Honourable Minister, Honourable Deputy Minister are here, please go and visit Kelantan. Kelantan has long had its Rahmah menu. In the morning, nasi berlauk at RM3.50, very appetising, and even from Kota Bharu it is exported to Putrajaya and also to the Klang Valley. I am confident that traders offering Menu Rahmah at RM5 do so because of their corporate social responsibility. However, the more important core matter is the seriousness of the government in ensuring that raw material prices can be controlled and that price reductions must be competitive. The government's solution must be comprehensive and able to sustain the survival of traders so as to ensure welfare is guaranteed. Do not, in wanting to make the agenda and what this government is doing a success, let our traders be burdened.

Datuk Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Item 030000 – Consumer Empowerment, the allocation for Item 030300 – Consumer Research and Policy. If we look at the objective of this programme, it is to identify current consumer issues through research. Surely, through this research it will be translated into a strategic framework that is able to protect the current market in the country. So I want to know the time period the government will take to conduct the study. The cost of living is increasing, the people at the bottom can no longer endure what is happening, and suddenly the government has provided this allocation without any time frame as to when the allocation provided for research to improve the management system to ensure the people's cost of living becomes more competitive. Before becoming the government, many in the government were skilled at formulas. They said we would use these government agencies to find ways to reduce the price of goods. However, once they became Ministers—we see the Minister of Economy speaking to defend his appeal to the people to use people's power to reduce prices. So, now that it is a different government, the story is different. The people chose the Members of Parliament and the government that exists today, and it must do the work. I recall what the Honourable Tambun once said, when he gave a label to the government at that time, that this government, at this time, is a sleeping government. A sleeping government that does not hear the cries and wails of the people below. I saw in a live TikTok a bundle seller who accepted an offer from a person who previously held a position, whose finances were stable. But he went to sell his shoes just to get RM200 to pay his child's school fees, to open this school. This is very heart-wrenching. Suddenly the previous government introduced i-Lestari and i-Citra, and this government now introduces 'i-Cagar', if I may name it so. The people who are caught in the squeeze have already borrowed much, and suddenly they are encouraged even more to pledge their EPF to take new debt. This is not the best solution for the people. I urge the government to promptly approve what the people have requested, not in the form of pledging their EPF. Item P.25, the allocation for Item 00001 – Cost of Living and Research Sector allocates RM600,000. I want details of the direction of this research and which agencies, corporate bodies and universities are implementing this project? Once again I want to stress, ensure this study is effective and useful for solving the people's cost of living. Today the people are plagued with many problems, among them unemployment, high raw material prices and rising monthly costs. The people no longer want formulas that have no end that are best for the people. Mr Chairman, the last item is the item...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Datuk Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Time is up, yes.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Ya.

Datuk Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Can't you add a little more?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Not any more. Thank you.

Datuk Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Okay, thank you to Mr Chairman for giving me the time.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Pengkalan Chepa. I invite the Honourable Miri.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you, Mr Chairman, for the opportunity given to me to debate the Committee stage on the Ministry of Domestic Plantation and Cost of Living. I refer to page 279 under Supply Purpose 25 under Item 020100 – Regulation of Controlled Goods and Subsidies, which spends RM3,476,300. I request details from the Honourable Minister on this item. This is because, as announced by the Honourable Tambun in this budget and as many outside also know, many subsidies and controlled goods have been misappropriated and misused. I want to know to what extent the allocation of RM3,476,300 is able to help the government in regulating controlled goods and subsidies. This area certainly deserves more attention because it will help the government save hundreds of millions to billions of ringgit in subsidies from leakage. However, as the saying goes, where there is sugar, there are ants. Therefore, a more effective method is still to find a way to provide subsidies in a more targeted manner only to those who truly need them. Next, I refer to Item 020300 – Cost of Living and Research, which spends RM2,549,900. I request the ministry to explain to what extent the research conducted can propose or find a solution to help the people in tackling the cost of living. Indeed, this Madani Government, which has a people's spirit and understands the people's grievances, has a high political will, with the permission of the House, to help the people ease their burden.

Tuan Chiew Choon ManPKR · PHMiriEN

Therefore, I hope that with this allocation spent, it will help the government introduce more initiatives that can address the high cost of living, such as the Menu Rahmah introduced earlier. Next I wish to refer to Item 040200 – Emoluments of Contract Staff and Item 040300 – Emoluments of Price Monitoring Officers (PPH). Indeed, I have received many complaints from government civil servants in several agencies, including in this ministry, about their job security, with the permission of the House. If contract civil servants and officers show good performance and are able to carry out their duties well, the government should make them permanent civil servants. If they are not taken as permanent staff, at least the contracts offered to them should provide the same welfare as permanent civil servants. The period of contract service should also be extended, and should be renewed two or three months before the contract period ends, and not at the last moment. Given that the allocation provided for both contract civil servants and price monitoring officers is more or less fixed each year, the ministry should be able to plan the recruitment and renewal of contracts of these officers as I said just now, to ensure their welfare. Next, I wish to refer to Item 040700 – Price Uniformity Programme for Sabah, Sarawak and Labuan, which spends RM40 million. I request an explanation from the government on how this uniformity mechanism will be carried out and to what extent it is effective in making the prices of goods in Sabah, Sarawak and Labuan uniform? It is common knowledge that although the incomes of the people in Sabah and Sarawak are lower compared with the West Coast of Peninsular Malaysia, the prices of goods are the same and even higher compared with the Peninsula. This imbalance has put pressure on the lives of the people of Sarawak and Sabah.

Tuan Chiew Choon ManPKR · PHMiriEN

Therefore, I request that the government review a uniformity mechanism and create effective formulas so that not only can prices be made uniform, but the prices of goods in Sabah and Sarawak can also be stabilised. Finally, I refer to Item 041000 – Cost of Living Action Programme. RM1.5 million for the Cost of Living Action Programme. I want to ask the government whether this amount can be used to support and redevelop the Food Bank Programme. This is because previous records have shown that the Food Bank Programme run around 2018 and 2019 succeeded in helping a small number of people, especially the less well-off, to obtain food, which indirectly eased their cost of living. That concludes my speech. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Miri. I invite the Honourable Kangar.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Peace be upon you, and the mercy and blessings of God. Good afternoon to all members of the House. Thank you, Mr Chairman. The Ministry of Domestic Trade and Cost of Living (KPDN) is a ministry that is significant to the people. As the name says, it concerns the cost of living. So, according to a study by the UCSI Research Centre for Polling, 60 per cent of respondents are worried about the prices of kitchen goods and food, which often rise. So I refer directly to Item 00001 – Cost of Living and Research Sector. So if we look at the budget for 2023, it is RM600,000 compared with RM2 million in 2022. So I ask the Minister why the budget for 2023 is not up to RM1 million. Is this item less important? I go to the second point, referring to Item 00600 – Basic Infrastructure Development. What are the government's plans for basic infrastructure development, especially in the state of Perlis? So, given that the current government focuses more on living at lower cost, such as through the Menu Rahmah, which is well known as the Menu Rahmah. Why is this budget lower in 2023, at RM8.9 million, compared with RM12 million in 2022? So, must all traders act on their own without government assistance to reduce the cost of living? I go to the third point, Item 04004 – Entrepreneurship Development: Franchise Development. So to what extent has Kangar been given assistance to implement this programme, given that the 2023 budget is also only RM3 million? So I ask the ministry also to focus on reducing the capital cost for traders, especially traders of food goods. I also ask the ministry to facilitate operators, whether restaurants, eateries, or small hawkers, in obtaining packeted cooking oil supplies. This is because it can reduce capital costs compared with bottled cooking oil, which is more expensive. So traders need cheaper packeted oil to reduce their business costs. The next item is Item 020400 – Enforcement. If we look at the budget, RM35 million is quite a large figure. My suggestion is that the government continue to take action against parties who misuse controlled goods and subsidies, such as packeted cooking oil and petrol or diesel, especially by foreigners, particularly in border areas. I am sure the ministry does carry out operations. However, this time I ask that you please look at the petrol stations and border areas around Perlis. This is because what I have seen before is many foreign pickups at petrol stations, refuelling for quite a long time there. So

Tuan Zakri bin HassanBERSATU · PNKangarEN

I ask the ministry to monitor the area. Thank you also to the ministry because in Perlis there are two non-subsidised petrol stations, namely in Wang Kelian and in the industrial area of Kampung Kolam. Lastly, Item 041100 – Buy Malaysian Goods Campaign. So I ask the ministry, to what extent has the government's effort in running the Buy Malaysian Goods Campaign progressed, because so far I have not clearly seen that campaign. We still prioritise imported goods, especially in the food, fruit and vegetable sectors. Thank you from Kangar.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Kangar. I call the Honourable Member for Batang Sadong.

Puan Rodiyah binti SapieePBB · GPSBatang SadongEN

Thank you, Mr Chairman. I refer to the items under the codes Item 020300 – Cost of Living Matters and Research, and Item 041000 – Cost of Living Action Programme. My comment, or I wish to add to what the Honourable Member for Kangar raised earlier, which centred on the very low budget. After that, I would like to add, for the public's knowledge, that the Menu Rahmah Programme was launched on 31 January last, aimed at meeting the daily food needs of low-income groups. The launch of this programme was carried out by the Honourable Minister of Domestic Trade and Cost of Living in Subang Jaya, Selangor. It is a good step in reducing the burden of the cost of living faced by the people at present. However, it is for a short period. So I ask the ministry to explain the implementation of the Menu Rahmah Programme in Sarawak. Number one, how does the ministry ensure that the Menu Rahmah is enjoyed by all the people of Sarawak without any discrimination against certain groups, especially the less well-off? Second, how many target groups are involved in this programme, whether specifically for the B40 or including the M40 as well? Number three, what is the ministry's strategy to expand the Menu Rahmah across all higher education institutions (IPT) in Sarawak?

Puan Rodiyah binti SapieePBB · GPSBatang SadongEN

Next, Item 020400 – Enforcement and Item 00211 – Control of Goods and Subsidies. Before long we will be observing the month of Ramadan, which is next week. Next, Hari Raya Aidilfitri, and in Sarawak there is Gawai Day in June. Every year there will certainly be issues that arise regarding the increase in the price of goods, and this issue has not been spared in Sarawak. High demand ahead of Ramadan and Hari Raya will certainly cause traders to take advantage by raising selling prices, and this will burden the people. Therefore, I want to ask the ministry: what is the government's strategy to control the rise in the price of goods, and what is the government's target through the Price Control Scheme; does it intend to extend the period of the current Price Control Scheme for goods during the festive season? Next, what intervention measures will the ministry take to monitor the prices of goods through the Price Control Act and the Anti-Profiteering Act, especially throughout the month of Ramadan and Hari Raya Aidilfitri? Does the government intend to review the Price Control Act and the Anti-Profiteering Act to ensure they remain always relevant to current issues and developments in the economic circulation? Finally, Item 020200 – Distribution and Business Trade, Item 020000 – Domestic Trade Development and Item 030000 –

Puan Rodiyah binti SapieePBB · GPSBatang SadongEN

Consumer Empowerment. I ask the ministry to explain several questions as follows. First, what is the impact of the initiatives implemented by SSM, the Companies Commission of Malaysia, during COVID-19? What is their effect now, and how many companies were able to be helped by SSM to survive after COVID-19, especially involving the people in Sarawak? Second, how many graduates and single mothers have been helped by SSM through the Free Business Registration Scheme so far? Is this programme still being extended, and until when? I ask the ministry to provide the number of graduates and single mothers involved, and whether they will continue to benefit from this through the budget allocation that has been provided, especially in Sarawak? Third, will other initiatives such as the Keluarga Malaysia Bargain Sales, as carried out by the previous government in every Parliament, be continued by the ministry to help the survival of the B40 groups, of whom there are still many in Sarawak? Finally, what are the latest proposed amendments to the Bill of the ministry, and what are their benefits to traders and consumers, especially in Sarawak? That is all. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Batang Sadong. I call the Honourable Member for Parit.

Peace be upon you, the mercy and blessings of God, and good afternoon. Mr Chairman, thank you for giving me the opportunity. Referring to Item 020100 – Regulation of Controlled Goods and Subsidies. Regarding the rather lax control at the border, it is understood that approximately 30 illegal bases along the Golok River at Pengkalan Kubor have been identified as actively being used as routes for the entry of controlled and subsidised goods from this country into Thailand. Seizures made by the national authorities have found that the smuggling involves goods such as sugar, cooking oil, wheat flour, petrol and diesel, and vehicles. My question is, does the enforcement division under the ministry still lack personnel and sophisticated equipment to carry out its duties at this time? Second, until now there are still many vehicles from neighbouring countries bearing foreign-registered plates coming to refuel subsidised petrol at our country's petrol stations on a widespread basis. Is there a concrete solution to ensure that this subsidised petrol is only for Malaysian citizens? The problem at this border has been mentioned by several Honourable Members, including the Honourable Member for Kangar, the Honourable Member for Arau and so on. We hope it can be resolved urgently. Referring to Item 020200 – Distribution and Business Trade. My question is, to what extent has the planning of policy and industry development for young entrepreneurs at the domestic and international levels been planned at this time? What initiatives have been taken, especially in my Parliamentary constituency, Parit, to help expand their business and marketing? Second, is big data optimised to develop a database to analyse needs and expand the business networks of the people? What is the ministry's effort in tackling the black economy, with respect, which often succeeds in escaping taxation? Referring to Item 020300 – Cost of Living Matters and Research. My question is, does this research take into account, from time to time, the number of people who have slipped into the poverty level at any time following the COVID-19 problem and so on in recent times? Second, has the government succeeded in creating comprehensive data to monitor essential daily goods at all times across the whole country? Third, what are the ministry's plans relating to the Jualan Rahmah or the like? In conjunction with the coming Ramadan and Aidilfitri, especially in my constituency in Parit, many among the B40 group are waiting for the government's announcement regarding sales at low prices to prepare for the coming Ramadan and Aidilfitri. Referring to Item 041100 – Buy Malaysian Goods Campaign. My question is, why was the cost of this campaign reduced from RM20,000,000 to RM10,000,000 this year? Considering that this campaign programme is very important in ensuring the survival of micro and small enterprises in our country.

Has the government succeeded in creating comprehensive data for monitoring basic essential daily goods at all times across the country? Third, what are the ministry's plans relating to Jualan Rahmah or the like? In conjunction with the coming Ramadan and Aidilfitri, especially in my constituency in Parit, many among the B40 group are waiting for the government's announcement regarding low-priced sales to prepare for the coming Ramadan and Aidilfitri. Referring to Item 041100 – Buy Malaysian Goods Campaign. My question is, why was the cost of this campaign reduced from RM20,000,000 to RM10,000,000 this year? Considering that this campaign programme is very important in ensuring the survival of micro and small enterprises in our country.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

The Honourable Member for Parit, an intervention?

The Honourable Member for Pasir Salak, please proceed.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

Thank you, the Honourable Member for Parit. Mr Chairman, of late Malaysia has been importing a lot of food, fertiliser and pesticides, even though we are able to produce the basic materials that we have in Malaysia. Does the Honourable Member for Parit agree with Pasir Salak that the government needs to provide assurance that the Buy Malaysian Goods Campaign must be strengthened and imported materials reduced in all aspects?

Yes. Mr Chairman. It is very inappropriate to reduce the cost of this campaign by 50 per cent, from RM20,000,000 to RM10,000,000. I do not know what the rationale for this action is, but we as Malaysian citizens should have a sense of identity and love the goods of our country. Therefore, this campaign should be intensified from time to time to ensure the survival of micro and small enterprises in particular in our country. That is all from me. That is all, Mr Chairman. Peace be upon you, the mercy and blessings of God.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Parit. I call the Honourable Member for Bakri.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Mr Chairman. I wish to refer to Item 040400 – Cooking Oil Price Stabilisation Scheme Programme (COSS). I expect this is what we always call cooking oil subsidy. Last year, in 2022, the government allocated RM400 million and is expected to have subsidised 60,000 tonnes of packeted cooking oil a month. According to statistics, the cooking oil requirement for a household is approximately 1.8 kilograms a month. So I consider this amount sufficient. The problem is, we often receive complaints from customers, perhaps this is the second episode mentioned by the Honourable Member for Kangar earlier. The Honourable Member for Parit also mentioned earlier that they cannot buy this packeted oil. At supermarkets, and sometimes at sundry shops, the shelves for this packeted cooking oil are empty.

Tuan Tan Hong PinDAP · PHBakriEN

His question is, about these 60,000 tonnes of packeted cooking oil, this subsidised cooking oil, where do these oils go? To the extent that some people from Muar

Tuan Tan Hong PinDAP · PHBakriEN

jokingly say that if you want to buy this subsidised oil, you have to go all the way to Padang Besar, go to Sungai Golok — these Thai names are difficult for me to read. To the extent that they say packeted oil sold at about, if I am not mistaken, RM2.50 in Malaysia can be bought for THB60 to THB80 in Thailand. So, this shows...

Tuan Zakri bin HassanBERSATU · PNKangar

Betul, betul.

Tuan Tan Hong PinDAP · PHBakriEN

...That— thank you. This shows that there is activity of smuggling subsidised oil abroad. So, I seek clarification from the ministry on the extent of enforcement and monitoring activities against the production and marketing of this subsidised oil, so that every sen the government invests will benefit the people. The second issue, relating to Item 020400 – Enforcement. Mr Chairman, I often receive complaints or seek help assistance from food factory operators, who tell me that enforcement officers from the KPDN frequently come to check their stock or inventory of raw materials, which are usually wheat flour and sugar. If it is found that they exceed the permitted limit, their raw materials will be seized and they have to pay a heavy fine. I want to get an explanation from the ministry: what is the justification or rationale for setting a limit on these food manufacturers for storing their raw material stock? What is the justification, what is the rationale? Is there any tolerance, is there any leeway if it exceeds, for example, by less than 10 per cent, no action will be taken? This is because sometimes these food manufacturers cannot predict their supply of raw materials such as wheat flour and sugar. There are often shortages of raw materials, so sometimes they are forced to keep slightly more than what is permitted. So I hope the ministry takes care of this matter because the government has a role to help the people, not to trouble the people. It seems the time is not much...

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sudah tamat.

Tuan Tan Hong PinDAP · PHBakriEN

[Laughter] That is all, thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you. I call the Honourable Member for Temerloh.

Peace be upon you, the mercy and blessings of God, and greetings of peace. Thank you to Mr Chairman. I wish to touch on Item 010300 – Integrity. We see a very small increase. How many cases of misconduct and breaches of code of conduct resulting in dismissal or termination of employment have there been over the past three years? What efforts have been made to ensure that all complaints received are acted upon promptly? Item 020100 – Regulation of Controlled Goods and Subsidies. What types of goods were smuggled and successfully eradicated from 2021 to 2022, and what was their value? What is the impact on our country's trade? Next, Item 020200 – Distribution and Business Trade. We see that its allocation has decreased by more than RM6 million. The purpose, we know, is to develop the domestic industry. The question is, what is the contribution of the franchise industry and direct sales to domestic business? What efforts have been made by the ministry to encourage the development of this industry? Item 020300 – Cost of Living Matters and Research, which functions to manage a database of consumer essential goods prices as a reference source for the

government. The question is, what method is used to ensure there are no traders who take advantage to raise the prices of goods at will? Besides that, apart from the Menu Rahmah and also the Jualan Rahmah, what is the ministry's long-term plan to help the people reduce the cost of living? Item 030400 – Malaysian Consumer Claims Tribunal (TTPM). First, we see that its allocation has increased, by more than RM2 million. Of the cases heard, how many cases were heard, especially fraud cases such as 'scratch and win' throughout 2022? Can cases of umrah pilgrims who were stranded be brought to the Consumer Tribunal? Next, Item 030000 – Consumer Empowerment. To what extent has the consumer movement been implemented to raise consumer awareness to become rational and wise consumers? Item 040200 – Contract Staff Emoluments. The allocation has increased. The question is, why were contract staff who had served for more than 10 years terminated and given no increment or rewards? How many workers involved were terminated? What criteria are considered to qualify as permanent staff? Item 040600 – General Use Wheat Flour Subsidy. I want to know what other types of materials are eligible for subsidy besides the flour subsidy, which we also say is insufficient. Item 041100 – Buy Malaysian Goods Campaign. We heard earlier that many Members of Parliament also mentioned how important this campaign is, and we see the allocation has been reduced by 50 per cent. Why did this reduction happen? Has this campaign been successful? What percentage of Malaysian-made goods dominate the domestic market of our country? Okay, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Temerloh. I call the Honourable Member for Kalabakan.

Thank you, Mr Chairman. I now proceed to debate Item 020100 – Regulation of Controlled Goods and Subsidies. The smuggling of subsidised liquefied petroleum gas (LPG) cylinders to neighbouring countries such as Indonesia is one of the issues that often becomes a dilemma for local residents, because they cannot enjoy the subsidy benefits provided by the government due to the actions of a small number of people who smuggle these goods to make double profits. The smuggling of LPG cylinders has caused losses amounting to billions of ringgit to the government. For example, the Auditor General's Report 2018 states that from 2015 until 2017, the government suffered losses of RM1.7 billion as a result of the smuggling of LPG cylinders. The high demand from neighbouring countries has made this activity increasingly rampant, coupled with its low price compared to the prices sold in the neighbouring countries' markets.

For the information of Mr Chairman, the selling price of a 14-kilogram subsidised LPG cylinder is RM26 in ordinary areas. Meanwhile, this subsidised LPG is sold at between RM31 and RM35 per cylinder, including transportation costs and other costs, in areas that are difficult to access, for example in Pulau Sebatik. The price sold to neighbouring countries reaches as high as RM70 per cylinder, and even if it reaches RM200 per cylinder, demand there remains high.

[Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) chaired the Committee] Therefore, to overcome this problem, I propose that the ministry— First, replace the method of bulk subsidy provision with targeted subsidy provision to consumers in areas at risk of subsidy leakage. Second, carry out surveys to ensure the effectiveness of the use of subsidised goods, so as to identify the quantity needed by residents for a certain period so that there is no excess supply of subsidised goods. Third, require consumers to present their identity cards during purchase transactions of subsidised goods, and this is recorded in order to identify improper purchases. Fourth, the use of hologram chips on subsidised goods to make it easier for such goods to be detected if smuggled. Fifth, carry out regular inspections in areas at risk of smuggling. Sixth, the establishment of a task force between the ministry and other enforcement agencies to tighten operations at borders that are at risk of smuggling activities. Therefore, I very much hope that the smuggling issue can be addressed promptly by the ministry so that the people can receive these benefits. Mr Chairman, secondly, Item 020300 – Cost of Living Affairs and Research. At this time, the people are increasingly under pressure due to the sharp rise in the prices of goods, coupled with the increase in the OPR, causing inflation to have implications for the financial standing of the people. Its impact is felt not only in urban areas but also in rural areas. Furthermore, the significant differences in the prices of goods, especially in interior areas of Sabah and Sarawak, have a very big impact on the people because their incomes in these interior areas are far lower than the minimum wage set by the government. The prices of goods are the same, but the incomes of those living in the interior are lower compared to other areas. Furthermore, Mr Chairman, parents at this time are busy preparing school equipment for their children. However, the price of school equipment has risen sharply by up to 20 per cent. This will certainly be a great burden on the people. Added to this is the approach of the month of Ramadan and the month of Syawal, which will further constrain and burden the people in the area. Therefore, what is the decisive solution of the ministry to overcome this problem? Given that the people are still waiting for the best formula from the ministry to reduce the cost-of-living burden on the people through a reduction in the prices of goods and so on. It is hoped that the ministry can provide the best mechanism to help ease the burden on the people. Mr Chairman, thank you.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, the Honourable Member for Kalabakan. The Honourable Member for Gerik is invited to speak.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Assalamualaikum warahmatullahi wabarakatuh and good afternoon. Thank you, Mr Chairman, for giving Gerik the opportunity to take part in the debate on the Supply Bill 2023 at the Committee stage for the Ministry of Domestic Trade and Cost of Living (KPDN).

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

I shall continue, Mr Chairman, with Head B.25, the heading Item 020000 – Domestic Trade Development, page 279. Firstly, Item 020100 – Regulation of Controlled Goods and Subsidies. The increase is approximately RM16,000 for the year 2023. Significantly, it has not changed much. Therefore, my question is, is the amount of RM3.476 million sufficient? Whereas in the previous year with an almost similar amount, we were unable to fully resolve the issues of compliance with controlled goods prices and subsidy leakage, especially in border areas of the country such as the Malaysia-Thailand border at Pengkalan Hulu, Perak. For the record, the estimated leakage of diesel subsidies amounting to RM10 billion was diverted last year, as stated in the speech of the Most Honourable Member for Tambun during the tabling of the 2023 Budget. I am not sure whether this figure is accurate or not. I would also appreciate clarification. Next, for the heading Item 020300 – Cost of Living Affairs and Research. The reduction of RM114,009 is not very significant. However, in this matter, Gerik would like to request that the government urgently study the policies, methods and any formulas and research results so that they are immediately applied in government administration to resolve the people's cost of living issues. In addition to the Menu Rahmah initiative that has been introduced, the government also needs to look at the core factors that cause the increase in the cost of living, such as consumer products, daily products, household products, products involving school students, university and college students. So, Gerik would like further information: to what extent does such a budget help resolve this cost of living issue? Next, for the heading Item 0020400 – Enforcement. The increase of RM1.079 million in 2023 makes the enforcement budget total of RM35.879 million a fairly large amount. My question is, does this amount cover KPDN enforcement at the country's borders, especially regarding products that come in large quantities from Thailand such as food products, do they have halal status or otherwise? Does KPDN check down to the level of halal status and so on? Likewise the issue of smuggling of cooking oil and smuggling of petrol and diesel by foreign vehicles. What are the methods for controlling the issue of petrol and diesel trade? Can the government, with that budget, guarantee that the control of subsidy smuggling is better than in previous years? Next, Head B.25, Item 040000 – Special Programmes, page 280, for the heading Item 041100 – Buy Malaysian Goods Campaign. The sharp reduction of RM10 million in 2023 is a very large reduction. My question is, what were the achievements or accomplishments of the ministry in 2022 that the budget could be reduced by RM10 million this year? Is it sufficient? In an international economy that restrains imported products, why do we not intensify efforts to promote the Buy Malaysian Goods Campaign to our own people? Apart from reducing outflow of cash, local goods certainly use local materials and manufacturing, local workers and local factories. This is important to ensure that our domestic economy and trade are always protected and continuously progress. That is all, thank you.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, the Honourable Member for Gerik. The Honourable Member for Ampang is invited to speak.

Thank you, Mr Chairman. Ampang would like to touch on four matters under the items to be referred to. Firstly, reference to Item 00610 – PPP/PFI. So, given the size of the allocation for 2023 of RM40 million for this PPP or PFI, Ampang requests

The Honourable Minister to list all the projects or programmes or initiatives that will benefit from this allocation. What is the outcome or what is the expected result of this development expenditure? That is the first.

Secondly, for Item 04004 – Entrepreneurship Development: Franchise Development. I anticipate an increase in the 2023 allocation to RM3 million compared with RM1 million in 2022 for franchise development, which is indeed rather good news, although in my view it is also rather small, if it should be given even more. However, I am convinced that, in my view, the franchise system is a catalyst, it is a catalyst for the growth of domestic trade. So my question is, is this allocation for the provision of loans or financing or grants to franchise industry players? This is because I see that if it is not a grant, it is indeed very small when we look at the allocations available under the Ministry of Entrepreneurs. So if it is not for financing, what is the purpose of this allocation? That is one matter. Secondly, what is the Pernas programme? This Pernas programme was once placed under KPDN, namely Malaysia’s Franchise Champion, is it still under KPDN? If not, what is its status now and in which ministry is this programme implemented? Thirdly, it concerns Item 13006 – Intellectual Property Corporation of Malaysia (MyIPO): Development. I welcome the doubling of the 2023 allocation to RM2 million for this MyIPO. What I would like to voice here is, what is the ministry's strategy to accelerate the growth of Malaysia's intellectual property licensing industry, which I see is still lukewarm, as the Honourable Member for Kuala Selangor also touched upon. I hope it is not only an effort of merely allocating a budget, but I expect that under this development budget, it can truly supervise several protection acts for all components of intellectual property. Finally, Mr Chairman, under Item 041100, Ampang also wishes to touch on the Buy Malaysian Goods Campaign. If we look, when we go to neighbouring countries such as Indonesia or Thailand, we find local goods being sold everywhere and in many places. However, we have not yet seen this happen here. I see that this effort was actually started long ago but it seems it still has not succeeded. So my question is, what is the rationale behind the 50 per cent cut for this Buy Malaysian Goods Campaign, when purchasing local goods can reduce the country's number of imports and expand the manufacturing and production of Malaysian-made goods? Secondly, under the same item, I would also like to ask, what is the new ministry's strategy or plan to ensure that sales outlets increase or the success of this campaign can be implemented? If not, I see this programme is merely empty words, whereas our commitment is to ensure that local sales products can be sold widely. We also want to see that new brands under these products, such as Malaysia Mart for example, are present everywhere. Local products from abroad that are in fact plentiful in the market are no longer encouraged. So, with this, we see that our entrepreneurs can survive or can further expand their businesses. Insya-Allah, I am confident that Malaysian goods are far better compared to products sold from other countries, in terms of quality and brand. Thank you. That is all, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Ampang. The Honourable Member for Padang Terap is invited to speak.

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. Before I touch on the items relating to the ministry, I would like to take this opportunity to record my appreciation to the ministry's officials, whom I saw working very hard to prepare the ministry's answers. Earlier, when I passed outside the Chamber, I saw ministry officials who had to sit cross-legged on the floor to prepare the answers of the relevant ministry. Thank you to the relevant ministry officials. [Applause] Mr Chairman, I now proceed to touch on Item 010300 – Integrity. I would like to begin my debate by touching on the matter of integrity and governance of the government as it stands today, before the elections, we see the rejection of the practices of nepotism and cronyism. I would like to question in this item that I mention regarding appointments that are said to be– I would like an explanation from the ministry, whether the positions of Senior Private Secretary (SUSK) and Political Secretary (SUPOL) in the ministry, which we can see on the website insid.kpdnhep.gov.my, have listed positions that are said to be for the terms abang and adik (elder and younger sibling). So, I would like an explanation from the ministry: is the practice of cronyism and nepotism accepted in this ministry? Next, I would like to touch on Item 010900 – State PPDN. I observe that the ministry's agencies conduct a lot of monitoring and enforcement activities relating to the prices of goods at focal locations, especially in the capital city and major towns. I request that the same efforts also be intensified in villages in rural areas, because the residents here are also affected, moreover they are far from the goods collection warehouses, causing an increase in logistics costs. Next, Item 020100 – Regulation of Controlled Goods and Subsidies. I request the ministry to take seriously the issue of subsidised packet cooking oil being misused by the wealthy and by traders. With the problem of insufficient supply that always occurs seasonally, the government needs to immediately introduce new methods to control subsidised cooking oil, such as a coupon system and specific quotas. Within the same item, following the statement of the Most Honourable Member for Tambun the other day regarding the leakage of diesel subsidies with an estimate of almost RM10 billion, I would like to ask, how far has the development of Ops Tiris progressed, which involves five ministries and eight government agencies in combating the diversion of subsidised diesel? The value of the losses due to such massive diversion should be able to benefit the people. Therefore, anyone found to be colluding must be brought before the courts. Item 020300 – Cost of Living Affairs and Research. I would like to ask about the Menu Rahmah initiative, to what extent has the sale participation of Menu Rahmah been specifically in my district, Padang Terap? Have small traders in the villages welcomed the Menu Rahmah initiative or is it only led by large restaurants and outlets? Given that many residents in Padang Terap are families of rubber tappers, the sale of Menu Rahmah can somewhat reduce their cost of living. So, I request the ministry to increase the promotion of Menu Rahmah sales among food traders in Padang Terap. I also wish to congratulate the ministry for its concern in introducing Rahmah Cafés at public higher education institutions (IPTA) after the Raya festival. Apart from food, it would be better if the ministry also paid attention to the cost of living of students in other aspects such as internet data plans, public transport, book vouchers and house rent. I request that a package of assistance at affordable prices be introduced specifically for students to cover their study costs and other cost-of-living expenses.

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

Finally, Item 020600 – Malaysia Competition Commission (MyCC). There have been complaints from the people since the introduction of the RFID system at toll plazas, where technical errors frequently occur at toll booths, causing severe congestion. Therefore, because there is no competition in implementing toll collection, innovation and renewal are taking place very slowly. I request that the government study and urgently implement a more effective toll collection mechanism. Thank you, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Padang Terap. The Honourable Member for Kampar is invited to speak.

Tuan Chong ZheminDAP · PHKamparEN

Thank you, Mr Chairman, for giving me the opportunity to take part in the debate on the Ministry of Domestic Trade and Cost of Living.

Tuan Chong ZheminDAP · PHKamparEN

First of all, I would like to speak on Item 020100 – Regulation of Controlled Goods and Subsidies, RM3.476 million. Can I know the details? This is because I see here that most of it is under RM10,000, which is emoluments. Is this given as salary, or is it really a subsidy that reaches the people? I also want to know the details in terms of the number of categories of goods given and also by state. For each state, what is the breakdown? Second, Item 020500 – Competition Appeal Tribunal, totalling RM770,000, and also Item 020600 – Malaysia Competition Commission (MyCC), totalling RM10 million. The Malaysia Competition Commission is the body responsible for coordinating the Competition Act 2010. As we all know, if there is no competition, prices will rise a lot because there is power in monopoly or oligopoly, two or three major suppliers. We already know that in Malaysia we have a meat cartel. I want to know, what efforts has the ministry made to break up the monopolies of the meat cartel? This is because we do not want consumers to be forced or compelled to buy expensive meat because of the monopoly or oligopoly of several big companies. So I hope an explanation can be given. Next, Item 040300 – Emoluments of Price Monitoring Officers (PPH), totalling RM41 million. I want to know the details: how many officers there are and the breakdown in each state? How many officers are there for each state? Likewise, just now, Item 040700 – Price Standardisation Programme for Sabah, Sarawak and Labuan, totalling RM40 million. I want to raise here, this is a news report from Astro Awani last year. [Showing relevant document] "The government allocated RM200 million to implement the Price Standardisation Programme this year..." But I see in last year's budget book, RM40 million. So I want to ask, where does the RM160 million come from? Because here, from the news report – at that time it was PN. "Deputy Minister of Domestic Trade and Consumer Affairs, Datuk Rosol Wahid, said the six states concerned, including Sabah, Sarawak, Kelantan, Terengganu, Kedah and Pahang..." There are two questions here. First, why does the Minister here mention RM200 million, but in last year's budget book only RM40 million? Where does the extra RM160 million come from? Second, if last year there really was RM200 million, how could Sabah and Sarawak only get RM40 million? They should have received more. At least 80 per cent, because we know prices in interior Sabah and Sarawak are very high. So I ask for an explanation from the ministry: how can there be RM200 million but only RM40 million in the budget book? Next, Item 041100 – Buy Malaysian Goods Campaign, reduced from RM20 million to RM10 million. Just now many Honourable Members have also

Tuan Chong ZheminDAP · PHKamparEN

stood up. I just want to ask the ministry, what efforts are being made to help our traders, especially traders in Malaysia, to raise their brands, because we know there are many brands that originated in Malaysia? We do not know, such as BONIA, British India, Ogawa, Secret Recipe, San Francisco Coffee, all of these are Malaysian brands, including franchises here. Can we or can we not help our traders so that more Malaysian traders can rise to the international level? Next, I want to ask about Item 050200 – Office Space Renovation, totalling RM4.45 million. The Honourable Member for Tambun has announced that he will not buy a new car, he will not renovate his office. So I want to ask for an explanation: what is RM4.45 million for office renovation? What was done and was this necessary? I want to know. Next, Item 01200 – Enhancement of Information and Communications Technology. This is a new allocation. There was none last year, I see. So I want to know, what are the details? RM4.8 million, what information technology is to be enhanced? So I hope the ministry can give clarification on all the items I have raised here. That concludes my speech, thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Kampar. I invite the Honourable Member for Tumpat.

Assalamualaikum, Mr Chairman. Thank you for giving me the opportunity to debate in this committee. I would like to refer to Item 030400 – Malaysia Consumer Claims Tribunal (TTPM). How many cases were reported in 2020, 2021 and also 2022? What cases were brought by the public concerning these claims? Second, does the government have an online consumer journal so that all decisions of cases in the tribunal can be seen and studied by the public, so that they too will not fall into the same cases? Under Item 020300 – Cost of Living Affairs and Research concerning consumer education in the community and agencies. Does the government have a proposal to ensure that in today's life, we are not only talking about cost of living but moving towards an independent way of life among Malaysians? This requires a great injection and high political will, where the government should ban or control contents or media that promote a luxurious lifestyle, which is not suitable for the present times because we are in a state of crisis. So if we can control at least by establishing consumer ambassadors, it can, God willing, make society's lifestyle more frugal and also blessed. Under Item 030300 – Consumer Research and Policy. I want to ask the government, what new policy will be introduced in 2023? Does it involve public universities and outside parties in consumerism as stakeholders? This is because today we see that many students who take consumerism courses, but we do not see their function in campaigns, especially for facing current conditions. Under Item 04004 – Entrepreneurship Development: Franchise Development. What is the government's target for new entrepreneurs under the franchise industry in 2020? How can we monitor and look after the welfare of businesses? This is because we see that, usually every time there is a franchise industry and direct sales, many people are involved, but the numbers will keep shrinking and shrinking, without us being able to see their development better. So if it can be seen at government level, it would be a better education to see the continuity of their businesses.

Under Item 030100 – Consumer Movement. What incentives and subsidies are given by the government to sundry shops across the country? This is because, for example, in Tumpat we have 676 sundry shops. So if we can help them, it will go directly to the community. Under Item 13006 – Intellectual Property Corporation of Malaysia (MyIPO): Development. We are informed and also we see that the registration of intellectual property is still at a low level. So I have dealt with the Intellectual Property Department before and we see that its service is not very customer-friendly. So if possible, we want a more proactive movement among intellectual property registration so that the government's target for intellectual property registration with entrepreneurs can be increased, and to provide legal protection and rights to them. Under Item 00001 – Cost of Living Affairs and Research Sector. How many agencies operate food banks? This is because I am informed that food banks were previously operated only by agencies or NGOs. In Kelantan, we have a project called Al-It'am under the state government, where 300 people per State Assembly (DUN) are helped, totalling 13,500 people every month, to whom we give rice, sugar and also cooking oil. So we hope that in this season, does the government plan to ensure these food banks are placed directly under the government so that it can directly help the people? Does the government plan to provide refrigerators or freezers for areas densely populated with B40 and flood-prone areas that have a high tendency to face problems if disasters occur, added to the current living conditions? Next, regarding the Cost of Living Council established in 2018. I think it is time for the government to bring down this Cost of Living Council to the state level because it is getting worse and requires serious action from all parties. I also propose that on this matter, the government under this ministry works together with the Credit Counselling and Debt Management Agency (AKPK) to educate the public to live frugally with a preventive mindset, not only contacting AKPK after they face financial problems. So if AKPK becomes a famous subject among the community, God willing, we hope the cost of living issue can be resolved. Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member for Tumpat. Next, the Honourable Member for Arau.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

The Honourable Member for Arau, showtime.

Assalamualaikum warahmatullahi wabarakatuh. I ran here, Mr Chairman, because number 17 was not present. So, however, thank you for giving me the opportunity to debate together under the Ministry of Domestic Trade and Cost of Living. The first item is Item 020300 – Cost of Living Affairs and Research. Honourable Minister, once again I want to ask the Honourable Minister, this morning there was an oral question, I asked the Honourable Minister and the Honourable Minister informed that your ministry is not involved with the Malaysia Competition Commission (Suruhanjaya Persaingan Malaysia).

However, since the Honourable Minister did not have time to answer just now, I think the Honourable Minister can answer again regarding what I raised, namely about a businessman named Deepak, whether he is included in the cartel that is being fought by your ministry. The Honourable Minister answered just now that this is not under your ministry. But according to the record here, it shows that he is included under

the Competition Act. So, I ask the Honourable Minister to give an explanation on this matter. To all Malaysians and young people, we want to hear about the hot issue being discussed by Malaysians concerning the importation of eggs from India involving branded people, whose names are already well known and often associated with branded people. So this needs to be corrected because the current government is the Madani Government. A government that is always frank. So we must be frank with the people. However, there are some matters I raised doubts about just now. Old things given new brands. Can it change the situation? For example, Honourable Minister, previously we had the Special Jihad Task Force to Tackle Inflation. The Honourable Minister has mentioned my name and I was involved in that committee. Supposedly that committee was not effective, so a new committee was set up, the Cost of Living Action Council, because the old jihad committee was not effective, even though it met twice a week. I want to ask, is the cost of living now decreasing? Are the people getting happier? What I know is that the cost of living is still rising and the people are not happy. Moreover, the people are not happy when the EPF (KWSP) problem here has not yet been resolved. So, many things the government wants to introduce are supposedly already resolved. For example, as the Honourable Minister of KPKT just said, "The Fire and Rescue Department (Bomba) has been completed". Three months and they have not even managed to erect a pole, Honourable Minister. The Honourable Minister of Defence, three months and they did not even manage to erect a pole. Suddenly, "Bomba is complete". This is an example, Honourable Minister. This is just an example.

Dato’ Seri Utama Mohamad bin Haji HasanUMNO · BNMinister of Defence · RembauEN

Why is my name being mentioned? [Laughter]

I am addressing the Honourable Member because the Honourable Member is in front of me. So, this is a very good thing because the Honourable Member is willing to wait until the end. This is good! [Applause] So, we give appreciation. So, if you scold, scold too. Especially regarding Beting Patinggi Ali, up to the Honourable Member's turn just now. So, I say it once again. Okay, no problem, want to rename it, go ahead and rename it. But I want to tell everyone that everything was started by the previous government. Now it has just been completed. If the Honourable Member says "...this has been completed, it will be completed...", we had already started. If the Honourable Member wants to start, the poles have not even been erected, they have only just started drawing the plan. Remember that. But do not give the people the impression that this has been completed here and there. So, for example what I have mentioned in relation to resolving the cost of living. For example, now we want to introduce Pasaraya Rahmah. Previously we named it Jualan Rakyat. Ladies and gentlemen, Jualan Rakyat is essentially the same. Now, it's alright. We want to put the name Rahmah because to enable a new mindset that is more Madani in character, we put the name Pasaraya Rahmah. Jualan Rakyat was implemented earlier and it received a tremendous response from the people. Now, we have increased the allocation to enable this Jualan Rakyat to become even greater and we have named it Pasaraya Rahmah.

Honourable Member for Arau, Honourable Member for Arau, just a little, just a little, Honourable Member for Arau.

If the earlier sale was the Jelajah sale?

Jualan Rakyat.

If Jualan Rakyat received an extraordinary response, can the Honourable Member for Arau – why did we not know much about that programme and how great was that programme? We did not even hear about it?

Because the Honourable Member has just won the election. Has just become a people's representative.

I have been a people's representative for three terms. Including this, four terms.

We involved the people. However, there are people who still think that those who are the best have hidden themselves.

Tuan Chong ZheminDAP · PHKamparEN

Ask a little, ask a little.

Only now has he emerged as a people's representative.

Tuan Chong ZheminDAP · PHKamparEN

Honourable Member for Arau, ask a little. If...

So, no need to ask questions that can trap yourself.

Tuan Chong ZheminDAP · PHKamparEN

A little. If Jualan Rakyat was great, was there orange juice poured earlier?

No, I said great.

Tuan Chong ZheminDAP · PHKamparEN

Was orange juice poured and was it eaten?

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member for Arau, one minute.

Where does this scoundrel come from? Where does this scoundrel come from? You stood up and spoke without asking my permission! Mr Chairman! This, this is what you call a scoundrel! Ask for permission!

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

I take note.

Tuan Chong ZheminDAP · PHKamparEN

Just now I asked! I had already stood up. I asked. Alright, alright.

If I do not allow it! I do not allow... [Public address system switched off]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Members, don't turn this into a market, okay. Please, Honourable Member for Arau, finish. I'll give it to you in one more minute.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

He wants to show on TikTok to his audience.

[Speaking without the public address system] ...Best for the people. But do not say earlier we did not know, you have only won a few days ago. Wait after this, we will recapture it, then you will know Wednesday and Thursday! Okay, so...

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)

Yang Berhormat...

So, our jihad task force held meetings twice a week. Now, I do not know how many times the Honourable Member has held meetings. After that, proudly saying the cost of living has dropped. There is no way the cost of living... [Public address system switched off]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, your time is up, Honourable Member. Enough. Enough, I have given you two extra minutes already.

[Speaking without the public address system]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, enough.

Honourable Member must remember, if I now call for a quorum, all of you will be seated with me. Count how many of you there are. The quorum is not enough. But we do not have the heart.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

They are not interested in debating. They just want to make trouble.

[Dewan riuh]

Tuan Cha Kee ChinDAP · PHRasahEN

We have enough for the quorum.

Honourable Member for Arau, Honourable Member for Arau, do not... [Public address system switched off]

[Dewan riuh]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Enough, enough. Honourable Member, sit down. Sit, enough. Your time is up, Honourable Member. Honourable Member, your time is up. Honourable Member... Thank you, Honourable Member. Your time is up. [Applause] Honourable Member, sit down, Honourable Member. Sit, Honourable Member. Time is up. Thank you. Please, the Honourable Member for Sandakan.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Chairman. Mr Chairman, today I only want to refer to three items. My first item is Item 040400 – Cooking Oil Price Stabilisation Scheme (COSS), which is the largest allocation under this ministry. So, Malaysia is the second largest palm oil exporter in the world. Exporter of palm oil products, yet the prices of our cooking oil products seem to be rising increasingly out of control. So, what is the cause of this uncontrolled increase? My question is, the government is spending a large sum of RM500 million on subsidised cooking oil, but we still often receive complaints that there is almost no oil.

Mr Chairman, can we count the quorum or not? Because everyone has to be called in. It is not good. I had to step out briefly to pray.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Does the Honourable Member want to call a quorum?

Tuan Wong Kah WohDAP · PHTaipingEN

Okay, I ask the Honourable Member for Pagoh to come in.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)

Sebentar, sebentar.

It is prayer time, it is prayer time.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Why did you go and bother him, Honourable Member for Arau?

The Honourable Member for Seputeh challenged me. He said a lot.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

I– The Secretary has counted, there are enough.

Puan Teresa Kok Suh SimDAP · PHSeputeh

You Wahabi, you know? Cannot do this.

Look, he said I am a Wahabi.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

What is Wahabi? Suddenly, this Wahabi?

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, the quorum is sufficient. Go ahead. I– Honourable Sandakan, I give you the time. Please proceed.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

May I continue? Thank you.

Honourable Member, I– Okay, now if the bell rings, my friends walk out, the quorum is not sufficient. However, we are a good person. The...

Tuan Tan Kar HingPKR · PHGopengEN

Hey Mr Chairman, he is just wasting time. How much time has he wasted already?

If they continue to make noise, Honourable Member... [Public address system switched off]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, please do not waste the Honourable Member's time. Honourable Member, please.

[Dewan riuh]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, so far I count, Secretary, count, enough. Enough.

[Dewan riuh]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Sandakan, carry on. I will add three minutes.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Chairman. I continue the debate from earlier. So, the government has spent a large sum of RM500 million on subsidised cooking oil, but we still often receive complaints that there is almost no subsidised cooking oil available at sundry shops or supermarkets most of the time.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

So, how is this subsidised cooking oil distributed across all towns and villages in this country so that it benefits the targeted group? Second, I also wish to refer to Item 040700 - Price Standardisation Programme for Sabah, Sarawak and Labuan, where a sum of RM40 million has been allocated. The cost of living, especially the cost of food and building materials in Sabah, has increased significantly since the COVID-19 pandemic. In fact, the prices of goods in Sabah may be higher compared to Kuala Lumpur. However, at the same time, our wages are much lower compared to Kuala Lumpur. Therefore, I urge the ministry to consider a larger allocation under this programme to standardise prices between Sabah and the whole country. Third, I wish to refer to Item 040300 - Emoluments of Price Monitoring Officers (PPH), where a sum of RM41 million has already been allocated. RM41 million is a very large estimate, larger than the Price Standardisation Programme for Sabah, Sarawak and Labuan. So, I propose that in this very sophisticated era, I suggest the ministry encourage the use of social media, such as housewives, to help check and report prices across the country to the ministry through social media channels or other systems. So, I believe we will get millions of Malaysians across the country who are willing to help as a service to the nation by monitoring prices in every corner of the country. With the help of the public as price monitors across the country, I believe this allocation, or part of this allocation, can be channelled to other programmes such as the Price Standardisation Programme for Sabah, Sarawak and Labuan, which will benefit a very large percentage, especially the B40 group, by reducing their cost of living, which is truly burdensome, and they are also the group that truly needs assistance from the government. That is all from me. Thank you.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Sandakan. The last debater is Honourable Seputeh.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Thank you, Mr Chairman. I wish to refer to Item 010500 - Corporate Communications, Item 020300 - Cost of Living Affairs and Research, and also Item 01200 - Enhancement of Information and Communications Technology, and finally Item 050200 – Office Space Renovation. Mr Chairman, I would like to commend the efforts of the Minister and also the ministry for putting forward the idea of Menu Rahmah, and it has been well received by our society. I would like to suggest that the ministry should try to engage, we say, with all Members of Parliament here so that we know how we can help the ministry encourage more restaurants and eateries in our respective areas to offer Menu Rahmah. Also, I would like to suggest that publicity for the ministry on this Menu Rahmah be enhanced, especially we could set up a website or have a Facebook or Instragram and so on. This is to introduce and tell people who want to look for Menu Rahmah where they can eat food at a moderate price. I think that in a world where social media is used so much, I think we could perhaps release an application for students and young people who want to look for this Menu Rahmah food. Under Menu Rahmah, previously we could actually promote it through social media. Second, when we say we want to launch Menu Rahmah, I hope the ministry can do something, because whenever the festive season comes, we often see, especially at hotels, a lot of food being wasted. Usually when we have, for example, a Chinese New Year dinner at a hotel and also iftar during the upcoming month of Ramadan, usually even though we have paid for everything to book a hall, there is usually a lot of food left over. When there is a lot left over and we want to pack it and take it home, we are usually prohibited even though we have made payment. The excuse from the hotel is that they are afraid that if people eat it and become ill or something, if anything happens, they do not want to be responsible. In fact, many hotel managers do not know that our Parliament has already passed the Food Donor Protection Act 2020, in which there is a part that was put in by the ministry as well – where section 3 has already been included: "A food donor shall not incur any civil liability in respect of any personal injury or illness suffered by any person, or the death of any person, arising from the consumption of food donated or distributed by the food donor." In fact, all of this is clearly provided for in the law passed in our Parliament, but many hotel and restaurant managers do not know. I would like to suggest that the ministry call all these hotels, tell them about the amendment to this Act so that they do not throw away so much food during the festive season. This food wastage is in fact very contrary to the ministry's efforts to promote Menu Rahmah. I suggest that people be allowed to take away, to pack it up, or we could donate it to homes for the elderly, orphans and so on.

Tuan Chong ZheminDAP · PHKamparEN

Honourable Seputeh, please give way a little.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Ya, cepat.

Tuan Chong ZheminDAP · PHKamparEN

Mr Chairman. Look now, the Opposition benches are completely empty. Not a single person is there. Look, this is a ... [Public address system switched off]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, this has nothing to do with it.

Tuan Chong ZheminDAP · PHKamparEN

I know. But this shows that they ... [Public address system switched off]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, sit down. Sit down. Okay, continue.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I will continue, Mr Chairman, time is short. The other point is the Companies Commission of Malaysia (SSM). If I am not mistaken, I looked for its website under this ministry. Recently, a woman was barred from entering the SSM premises in Ipoh because her clothing was supposedly a little too short. All of us who have seen the pictures displayed on social media or in the media, in fact her clothing is okay. She did not expose her body, excessive aurat and so on. But she was barred from entering. I hope the ministry can give a warning to the SSM side, because SSM says they are defending the officer who barred the woman from entering the premises. Don't be so excessive. Let us respect everyone who, as long as they wear decent and proper clothing, do not bar people from entering to carry out their business. Lastly is about the renovation of office space. What I want to know is that RM4.45 million will be used. Does this office space need to be renovated? So, what is the purpose? Perhaps the ministry can give an explanation. That is all from me. Thank you.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Seputeh. For the Ministry of Domestic Trade and Cost of Living (KPDN), a total of 19 Honourable Members have debated. Now is the time for the Minister to reply.

Puan Hajah Fuziah binti SallehPKR · PHDeputy Minister of Domestic Trade and Cost of LivingEN

Thank you, Mr Chairman. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, and good evening. Mr Chairman, I thank all the Honourable Members who have debated. A total of 19 Honourable Members have debated, namely Honourable Kuala Selangor, Honourable Hulu Terengganu, Honourable Rasah, Honourable Pengkalan Chepa, Honourable Miri, Honourable Kangar, Honourable Batang Sadong, Honourable Parit, Honourable Bakri, Honourable Temerloh, Honourable Kalabakan, Honourable Gerik, Honourable Ampang, Honourable Padang Terap, Honourable Kampar, Honourable Tumpat, Honourable Arau, Honourable Sandakan and Honourable Seputeh. A total of 19 Honourable Members have indeed debated, and the issues raised and the items raised are more or less equal in number, Mr Chairman. About 19 issues have been raised. Therefore, I will respond and wind up according to the items and issues raised. First, I would like to respond regarding subsidies. Mr Chairman, actually Honourable Members, we have actually repeated many times in the House that these subsidies, we have subsidies for goods, yes, goods that we subsidise and goods whose prices we control. The goods whose prices we control and subsidise include eggs.

Puan Hajah Fuziah binti SallehPKR · PHDeputy Minister of Domestic Trade and Cost of LivingEN

Eggs: we control the prices of Grades A, B and C and we subsidise them; two standard whole chickens: we control their prices and we subsidise them; LPG, diesel, RON95 and polybag cooking oil, Mr Chairman. Those are the goods whose prices we control and subsidise. There are also goods whose prices we control, such as flour, sugar, face masks, RTK and bottled cooking oil; we control their prices but we do not subsidise them. So, Honourable Members must understand the issue of subsidies. Second, which subsidised goods fall under the authority or responsibility of KPDN? The first is polybag cooking oil. That falls under the authority of KPDN. So, what was mentioned earlier, from RM400 million increased to RM500 million, is actually the amount included in the budget. However,

Puan Hajah Fuziah binti SallehPKR · PHDeputy Minister of Domestic Trade and Cost of LivingEN

what the Honourable Member said is true, that the actual subsidy is more than that amount. The quota issued is 60,000 metric tonnes a month, or 60 million packets a month. The price of subsidised polybag cooking oil is sold at RM2.50. The price of unsubsidised oil is RM6.90 per kilo, a very big difference. So, the total subsidy for cooking oil last year was approximately RM2.23 billion. Although the budget book allocates RM400 million, it was permitted by the Ministry of Finance to disburse the subsidy because it follows the CPO price, which fluctuates. So, that is what I want to inform about regarding subsidised cooking oil. Then, I would also like to convey something about flour subsidies. In fact, the subsidy is not fully used because people do not care much about flour. They do not look for the subsidised flour priced at RM1.35. So, regular flour in the market is what they buy, so the flour subsidy is not fully used. Regarding targeted subsidies and leakages, which were also raised by many Honourable Members. I would like to inform that– there are two issues here, yes. Two issues, one is leakage, the other is targeted subsidies. Targeted subsidies, which many Honourable Members raised, is something we really want to focus on. KPDN has already held a workshop on targeted subsidies. First, we need to identify what– the goods that we need to subsidise? What are the products? Because the other subsidies I mentioned earlier, flour and polybag cooking oil, fall under KPDN, but other subsidies such as diesel, RON95 subsidy, LPG subsidy, those are all under the Ministry of Finance, but enforcement is under KPDN. So, leakage is certainly something we take very seriously regarding leakage. Therefore, KPDN launched Ops Tiris. Ops Tiris also involves other ministries. We want to see how we can curb leakage. The mechanisms of leakage, Honourable Members, are very, very sophisticated. Sometimes we say that 60 million packets of cooking oil a month, surely it is not enough? People say, the public says, it is not available in the market. Reports say some are sold overseas. There are also complaints we receive saying that someone takes it in packets, puts it in bottles, and sells it for RM6.90. That is also among examples of leakage. But I would like to inform the Honourable Member that the 60 million bags a month, that quota does not include the quota for micro traders previously. However, we do not enforce it on micro traders because we know they also need it. So, we do not enforce it on these micro traders because many of them use this cooking oil. Selling fried bananas, selling chicken gunting, selling keropok lekor. So, we know this. That is precisely why this targeted subsidy laboratory is very, very important. We need to identify the product. Second, we identify who should receive it? B40? M40 and below? Micro traders? So, we are discussing this thoroughly. Finally, only then will we determine its mechanism. Whether to use eWallet or so on. Whether to increase the quota? Once we are certain how we want to target, then we will determine the mechanism. So, insya-Allah, among what we are looking at is increasing the quota. Among what we are looking at is how to ensure that those who are eligible receive it, because now we use bulk subsidies, and it is indeed sold at shops. If it is targeted, perhaps it will no longer be sold at shops, only those who should receive it and are eligible may obtain it. So, we are building that mechanism, the policy and so on have already been workshopped. Honourable Members may only be able to be announced around mid-year or later.

Tuan Cha Kee ChinDAP · PHRasahEN

Honourable Deputy Minister, can you take a short supplementary question? Rasah, Rasah.

Honourable Rasah, okay.

Tuan Cha Kee ChinDAP · PHRasahEN

I fully agree with the answer and also the explanation given by the Honourable Deputy Minister regarding the mechanism for the group that is our target group. I agree. That is what the previous government failed to do. So, for me, before we– earlier I examined the Honourable Deputy Minister's answer, we are in the process. It may take a few months, perhaps mid-year this year, perhaps the third quarter of this year, okay, fair. I fully agree that we must take time. Perhaps there could be a special mechanism or special shops to sell. But in the meantime, during that period, when everyone can still subscribe to and buy the 60,000 metric tonnes of cooking oil, can we not add, say, for three to six months in the meantime? I fully agree that leakage is everything, but that only contributes a small part, but in the market everyone is buying it right now. So, I humbly request, if possible, that is what I suggested earlier, for the time being, we increase it to 70,000 or 75,000, perhaps just for three or four months, until a more comprehensive mechanism, what people call comprehensive, that is more targeted at the target group, B40, can be established. Thank you, Honourable Deputy Minister.

Okay, thank you, Honourable Rasah. I think it can be discussed later, we will bring it to the meeting and discuss it. So that is regarding targeted subsidies and leakage. Then the next issue raised was regarding Jualan Rahmah. The Honourable Minister of Finance, Mr Chairman, in tabling the Budget 2023, mentioned the RM100 million allocated for Jualan Rahmah to be implemented in 222 Parliamentary constituencies. There are no exceptions; in every parliamentary constituency. However, its item is not under KPDN. Its item is under B.11, under the Ministry of Finance. Honourable Members can look there. So, after we pass this budget, we hope we can immediately implement Jualan Rahmah in the Honourable Members' constituencies. I will always assist Honourable Members should they wish to hold Jualan Rahmah for Ramadan, for Raya, for festive seasons and so on. We understand that the people are going through hardship. We understand that Jualan Rahmah will greatly help them later.

On enforcement. A total of RM35.87 million allocated in 2023 is for the enforcement strength of 2,200 enforcement officers across the country. KPDN (Ministry of Domestic Trade and Cost of Living) is studying the need to strengthen this division as a department in line with current needs. That concludes enforcement. On the Buy Malaysian Goods Campaign. Mr Chairman, I would like to inform the House that the RM10 million is for new medium marketing and product development. It is for marketing, but not for carrying out goods campaigns on the ground. The Buy Malaysian Goods Campaign can become part of KPDN's activities on an ongoing basis. It is already under supplies and services. Among KPDN's activities is carrying out, while we run the Jualan Rahmah, we can also promote the Buy Malaysian Goods Campaign. Next, on PPH. I think I should answer regarding PPH, which is the Price Inspection Officers (PPH). A sum of RM41 million. The total number of PPH is 934 officers and the salary of a PPH is RM2,400 each. PPH contracts appointed in 2022 were continued into 2023, and PPH contracts are renewed every year. With the existing PPH appointments, KPDN is able to monitor price increase issues.

The suggestion by the Honourable Member for Sandakan earlier was very good regarding how consumers can become the eyes and ears of the ministry. In fact, this is also what we have launched. Previously we had nine channels for complaints. If consumers want to lodge a complaint, they can use WhatsApp, use email, walk in, call by phone, use our ezAdu portal and so on. However, we have only just launched the QR code. Just one QR code. And we also launched Aduan Suri so that women can together help to become the eyes and ears of the ministry and lodge complaints. For Aduan Suri we made a QR code, we gave fridge magnets and placed them on the fridge. This is so that women can easily see it, easily scan it and easily lodge complaints. We found that the number of complaints increased when we rejuvenated or gave new life to this complaints system. So, thank you, Honourable Member for Sandakan, we are indeed doing this. On the issue of...

Tuan Chong ZheminDAP · PHKamparEN

Honourable Deputy Minister, I would like to ask for a little clarification. Kampar. For these PPH, 934 persons, is the RM2,400 the minimum salary or the average salary? This is because if we multiply 934 persons by RM2,400, the total emoluments should be RM27 million. However, here it is RM41 million. So there is a bit of a gap. Second, may I know, for these 934 persons, what is the breakdown in each state? If you cannot give it now, can you give it in writing?

Yes, I can. Thank you, and I will request to give a written answer with a detailed breakdown of how the total is totalled up or tallied. Okay, on the tribunal. This is something raised by the Honourable Member for Temerloh earlier. This is important. In fact, we see how people complain on Facebook, people complain on TikTok, people complain about expensive goods. However, in fact, Umrah pilgrims who are cheated, if the amount is below RM50,000, that consumer can lodge a complaint with the tribunal. The tribunal can take action against the said entrepreneur or trader. So, this is the ministry's advice to consumers. Make use of this existing tribunal. We have something like a court, actually. I have seen the room where the chairman of this tribunal hears cases. It is set up just like a court. So, that is what we suggest, that consumers use this tribunal.

Tuan Tan Hong PinDAP · PHBakriEN

The Honourable Deputy Minister.

Tuan Tan Hong PinDAP · PHBakriEN

We are well aware that this tribunal only handles cases involving traders and buyers. However, we notice the latest trend, where many people sell goods online without business registration. So, if any dispute arises, can the buyer obtain assistance from the tribunal? Has the ministry been prepared to extend the jurisdiction of the tribunal?

Okay, thank you. That is why it is very important for us to educate consumers. Consumer advocacy programmes are among the programmes that KPDN places importance on. Okay, among our complaints, we received more than 29,000 complaints last year and among the many complaints are online. Online. So, when lodging complaints with us regarding sales and a buyer feels they have been cheated, then send the complaint to KPDN, and we will carefully study what the next action should be. If it needs to be referred to the tribunal, it will be referred to the tribunal. So, lodge the complaint first. Lodge the complaint first and then this. One more thing, I would like to inform that KPDN, under SSM (Companies Commission of Malaysia), has also issued what is called BizCrest. A crest or a seal for businesses of traders who are registered and responsible. So, SSM issued a logo seal called BizCrest. B-I-Z-C-R-E-S-T. We also encourage consumers

to look for that crest when they buy online. This is so that they know this is an important company. I have a little time. I want to talk about price standardisation, which was raised a lot by Honourable Members. I want to tell you that Item 040700 – Sabah, Sarawak and Labuan Price Standardisation Programme, the RM40 million is the amount issued by the ministry to cover the cost of port-to-port transport, that is, port-to-port from, say, Port Klang to Sabah for example. That is RM40 million. However, under Item 040500 – Essential Goods Distribution Programme, LPG and Community Drumming, there is an amount of RM200 million. This RM200 million is in fact the price standardisation programme. This price standardisation programme involves more than 800 areas, 820 areas. If I remember correctly, the interior areas of Sabah, Sarawak and Labuan, and an additional 25 areas in Budget 2023. RM200 million, not RM40 million. RM40 million is for port-to-port transport costs. Okay. I think...

Tuan Chong ZheminDAP · PHKamparEN

Honourable Deputy Minister, so the total for the standardisation programme is RM240 million? RM200 million plus RM40 million?

There are two. There are two, yes. One is that Item 040500. If the Honourable Member looks at Item 050... [While checking the Federal Government Estimates of Expenditure Book 2023] The Honourable Member, please look. I cannot find it. Okay, Item 040500 – Essential Goods Distribution Programme, LPG and Community Drumming. This is the RM200 million. For Item 040700, which many Honourable Members raised, the RM40 million is for the port-to-port transport costs. So, for...

Tuan Chong ZheminDAP · PHKamparEN

Honourable Deputy Minister, I suggest that perhaps next time we can include them together because this is confusing. This is because it has been placed outside the item of the price standardisation programme.

No, Honourable Member. If we do not put the breakdown like that, it would not cover port-to-port. So, if we only cover transport to the interior of Sabah and Sarawak, then the port-to-port would be high. Therefore, we separate them. It is alright, Honourable Members, next year you can look at this breakdown again. I want to use the remaining time, Mr Chairman, if I am allowed. On franchising. The Honourable Member for Temerloh, the Honourable Member for Ampang and the Honourable Member for Tumpat, I think, were the ones who raised franchising. Actually, the RM3 million is a small amount. However, it is allocated to develop the franchise industry. It is not an allocation for financing or for grants. Financing is under PERNAS, which is under the Ministry of Entrepreneur Development and Cooperatives. The Act is under KPDN. So, there is a bit of an issue that we are negotiating between KPDN and KUSKOP (Ministry of Entrepreneur and Cooperative Development). Because the Act is under KPDN. Developing franchises is under KPDN. Then, to conduct its roadshows is under KPDN, to approve franchisors is under KPDN, and to register franchisors is KPDN. However, when it comes to providing financing to franchisees, it is KUSKOP. So, there are two ministries looking after two interests related to franchising. So, we will see, going forward, to ensure that it is more effective...

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Minister, one minute. Wind up. If— the answer can be given in writing.

Yes, thank you. I will. To ensure that it is effective, Mr Chairman— I will wind up. To ensure that it is effective, we need to align the financing and also the holders of this Act for franchise development.

Therefore, with that, I apologise. The others, we cannot answer. I will answer in writing. Mr Chairman, once again I thank the Honourable Member for their patience and thank you for their great concern— Menu Rahmah, I did not have time to answer, but I hope that after this, we can further develop initiatives under KPDN for the people. Thank you, Mr Chairman. [Applause]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. Honourable Members, the question is that the sum of RM1,191,811,400 for Head B.25 of the Operating Expenditure Estimates 2023 forming part of the Schedule be agreed to. [Question put, and agreed to] [Head B.25 ordered to form part of the Schedule]

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

The question is that the expenditure under Head P.25 of the Development Expenditure Estimates 2023 be approved. [Question put, and agreed to] [Head P.25 to form part of the Estimates of Expenditure] [The Dewan resumed sitting] [Deputy Yang di-Pertua (Dato' Ramli bin Dato' Mohd Nor) in the Chair

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Members, the sitting of the House today is adjourned until 10 am, Monday, 20 March 2023.

[The House adjourned at 8.13 pm]

Special ChamberSpecial Chamber

[Dato’ Mumtaz binti Md Nawi (Tumpat) presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Urgent attention and resolution of the issue of potholed and damaged roads in Klang DistrictSpecial Chamber

Mr Speaker, a total of 3,302 fatal accidents were recorded nationwide from January to September last year. These deaths were part of 255,532 accidents reported in the same period, and the figures are so alarming that Malaysia is ranked eighth in the world as a country with the most dangerous roads.

Looking closely at these statistics, one of the causes of deaths is damaged and potholed roads. This situation often occurs in my area. As the Member of Parliament for the constituency, I personally went down to the ground to conduct a survey and found many roads that are damaged and potholed, and this greatly worries the safety of local residents. The detailed information on the causes of potholed roads in the Klang district is as follows:

(i) the natural soil conditions in the state of Selangor (marine clay) are one of the causes of the problem of potholed roads in the state of Selangor, especially in the Klang district;

(ii) the increase in traffic loads and overloaded heavy vehicles passing along these roads is also one of the causes of road damage, and it also shortens the lifespan of the roads concerned, as well as the lack of continuous enforcement;

(iii) excavation works carried out by utility providers also cause potholes. After cable and pipe installation works are done, the roads concerned are not

properly resurfaced, and this causes the roads to become more easily damaged; and

(iv) as is well known, the Klang district has three major ports, which causes heavy vehicles to constantly move along not only the main roads but also commercial and residential areas. Therefore, the existing roads can no longer accommodate heavy vehicles, causing the roads to become damaged.

Thus, I would like to seek the kind assistance of the government, namely the Ministry of Works, to answer the following questions:

(i) what methods can the government effectively implement, and what are its future plans, to tackle this problem?;

(ii) can users make claims against government agencies if an accident occurs due to damaged or potholed roads, especially for state roads and Federal Roads?; and

(iii) the Klang district has the largest number of heavy vehicles in Malaysia, so it requires better road quality that can withstand heavy vehicles and high traffic movement, not only on main roads but also in industrial, residential and commercial areas. Therefore, what steps will the government take to ensure guaranteed and well-maintained road quality?

Thank you.

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

Mr Speaker, for the information of the Honourable Member, the Federal Roads involved in the Klang Parliamentary constituency total 89.05 kilometres, covering the following routes:

(i) FT 02, namely Jalan Pelabuhan Klang-Kuala Lumpur@Berkeley and its parallel service road, 27.48 kilometres;

(ii) FT 180, namely Jalan Pelabuhan Utara-Pelabuhan Barat, 4.40 kilometres;

(iii) FT 103, namely the road leading to Pelabuhan Barat, 4.43 kilometres;

(iv) FT 181, namely Lebuh Raya Pulau Indah, 17.70 kilometres;

(v) FT347, namely Jalan Lingkaran Pulau Indah, 10.00 kilometres;

(vi) FT 3220, namely Jalan Sultan Abdul Samad, 0.64 kilometres;

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

(vii) FT 3218, namely Jalan Perindustrian Pandamaran, 11.539 kilometres; and

(viii) FT 05, namely Jalan Klang-Sepang, 12.86 km, which is maintained by the Federal Road maintenance concession company.

Meanwhile, there are also roads under the supervision of local authorities (PBT) and the Port Klang Free Zone (PKFZ). Based on the records of this ministry, the number of pothole repairs on Federal Roads in the Klang Parliamentary constituency was 906 in 2021, 1,169 in 2022, while up until February 2023, 269 pothole repairs had been carried out by the Federal Road concession company.

For the information of the Honourable Member, the Ministry of Works, together with the Public Works Department (JKR), always takes complaints regarding road damage seriously. Therefore, damaged roads will be identified by the appointed Federal Road maintenance concession company, and the JKR will prepare a Road Maintenance Estimate (APJ) based on the road damage. However, approval of works is subject to the allocation approved by the Ministry of Finance and the priority list of works prepared by the Public Works Department based on the assessment of the critical level of road damage across the entire Federal Road network under the supervision of this ministry.

For the information of the Honourable Member as well, the appointed concession company is responsible for carrying out routine maintenance works, namely the scope of pavement maintenance, shoulder maintenance, grass cutting, road furniture, cleaning of bridges and culverts, cleaning of drains, and routine inspections. The concession company is also responsible for carrying out periodic pavement and non-pavement maintenance works implemented through Work Orders (AK) based on allocations approved by the Ministry of Finance.

The company is also tasked with carrying out emergency works by taking immediate action if unforeseen incidents occur. For example, clearing roads after landslides, preparing a Traffic Management Plan (TMP), and providing temporary routes to enable vehicles to pass through the road.

For the information of the Honourable Member, in 2022 this ministry allocated RM13.67 million under the Routine Maintenance, Periodic Pavement & Periodic Non-Pavement Maintenance Programme, implemented by the concession company through Work Orders (AK) on Federal Roads in the Klang Parliamentary constituency. These maintenance works involved eight periodic pavement works and four non-pavement works, and all works have been fully completed.

In 2023, up until March 2023, the ministry allocated RM6.86 million under the Routine Maintenance, Periodic Pavement & Periodic Non-Pavement Maintenance Programme. The works

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

maintenance works involve three periodic pavement works and four non-pavement works, and the works are expected to be completed in October 2023.

The ministry has also identified the damage in the Klang Parliamentary constituency and has planned 11 periodic pavement works valued at RM12.50 million and 28 periodic non-pavement works valued at RM9.10 million. These works will be implemented through Work Orders (AK) to the concession company, subject to the allocation approved by the Ministry of Finance and the priority list of works prepared by the Public Works Department based on the assessment of the critical level of road damage across the entire Federal Road network under the supervision of this ministry.

For the information of the Honourable Member as well, the increase in traffic loads and heavy vehicles – this we know, in fact. This is Port Klang − which exceed the load limit and become one of the causes of road damage, and it also shortens the lifespan of the roads concerned. To overcome this problem, the selection of the correct maintenance treatment method based on the type of damage occurring on site must be carried out. The mill and pave and overlay methods are suitable for locations experiencing functional damage. Meanwhile, for locations with structural damage, larger treatment methods such as reconstruction or partial reconstruction are more appropriate.

In addition, to improve the durability and lifespan of roads, the use of specialty mix paving materials is also adopted in road maintenance works. The type of specialty mix material to be used will be selected based on several criteria, such as areas frequently traversed by heavy vehicles, especially on main routes and industrial routes, curved roads, uphill routes, junctions, and the distance of asphalt supply to the repair location.

For the information of the Honourable Member, in the Port Klang area in particular, which frequently involves the use of heavy vehicles and heavy machinery, the maintenance method used is Cold In-Place Recycling (CIPR) for roads on ground. Meanwhile, roads located on structures or bridges will use the mill and pave method.

Apart from that, the ministry has also used specialty mix paving materials such as Super Fibre Mix, Crumb Rubber Modified Asphalt and Stone Mastic Asphalt as alternative road paving materials to improve the durability of road surfaces. This has proven that some of them are very effective.

In addition, to ensure that the quality of paving materials supplied complies with the specifications of the Public Works Department, the JKR has implemented audits of Asphalt Production Plants at every plant that wishes to supply paving materials for maintenance works on Federal Roads. In addition, Finished Paving Audits are also carried out after paving works are completed on site to ensure those works comply with the specifications set.

For the information of the Honourable Member, state road maintenance falls under the authority and responsibility of the respective state governments, whereas for Federal Roads, maintenance responsibility lies with the Federal Government, implemented through the Ministry of Works.

Regarding the issue of whether users can make claims against government agencies if an accident occurs due to damaged or potholed roads involving Federal Roads, since Federal Road maintenance works have been given to road maintenance concession companies to be carried out under the concession agreement signed between the government and the concession company, affected users may submit compensation claims and file lawsuits in court against the concession company or the Government of Malaysia.

Under the concession agreement concerned, the concession company has an obligation to indemnify the government against any claims arising from accidents, damage or injuries suffered by users due to the concession company's works. In this regard, the burden of proof lies with the user, by proving, among other things, that the accident was caused by road damage and not due to negligent driving by the victim or other road users.

For the information of the Honourable Member, this ministry proposes that the issue of road damage in the Klang Parliamentary constituency be addressed together with other parties.

Joint efforts with the Ministry of Transport need to be held to address the problem of excessive vehicle loads by vehicles passing along the roads, especially in the Port Klang area.

Cooperation with the Ministry of Economy and the Ministry of Finance is also needed to ensure that the required allocations disbursed are used to resolve the shortage of allocations, especially for roads in the Klang Parliamentary constituency. For the information of the Honourable Member, several Federal Roads in Klang need to be upgraded to accommodate high traffic volumes and to strengthen the road structures. However, these are not on the state priority list submitted to this ministry through coordination between the State Economic Planning Unit and the Public Works Department (JKR).

Accordingly, I call on the Honourable Member to submit these project proposals to the Selangor State Government so that the proposals can be considered in the state priority list submitted to this ministry.

The Ministry of Works, through the Public Works Department, is committed to ensuring that roads are always in a safe and comfortable condition by carrying out routine maintenance works throughout the year. Thank you, Mr Speaker. Thank you to the Honourable Member for Klang, and I hope it will help the Honourable Member for Klang a little, so that what we have answered can be brought to the state level and then to the Economic Planning Unit (EPU). Thank you, Mr Speaker.

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · Lipis

masing, manakala bagi Jalan Persekutuan tanggungjawab penyenggaraan adalah di bawah Kerajaan Persekutuan yang dilaksanakan melalui Kementerian Kerja Raya.

Berhubung dengan isu sama ada pengguna boleh membuat tuntutan kepada agensi kerajaan sekiranya berlaku kemalangan disebabkan jalan rosak atau jalan berlubang yang melibatkan Jalan Persekutuan, memandangkan kerja- kerja penyenggaraan Jalan Persekutuan telah diberikan kepada syarikat konsesi penyenggaraan jalan untuk dilaksanakan melalui perjanjian konsesi yang ditandatangani antara kerajaan dan syarikat konsesi, pengguna yang terlibat boleh mengemukakan tuntutan ganti rugi dan memfailkan saman di mahkamah terhadap syarikat konsesi atau Kerajaan Malaysia.

Di bawah perjanjian konsesi yang berkenaan, syarikat konsesi mempunyai obligasi untuk menanggungrugi (indemnify) kerajaan untuk apa-apa tuntutan akibat daripada kemalangan, kerosakan atau kecederaan yang dialami oleh pengguna disebabkan oleh kerja-kerja syarikat konsesi tersebut. Dalam hal ini, beban pembuktian adalah terletak pada pengguna dengan membuktikan, antara lain, bahawa kemalangan tersebut adalah berpunca daripada masalah kerosakan jalan raya dan bukannya akibat daripada kecuaian pemanduan oleh mangsa atau pengguna jalan raya yang lain.

Untuk makluman Ahli Yang Berhormat, kementerian ini mencadangkan isu kerosakan jalan di Kawasan Parlimen Klang perlu ditangani bersama pihak lain.

Usaha bersama pihak Kementerian Pengangkutan perlu diadakan bagi menangani permasalahan bebanan kenderaan berlebihan oleh kenderaan yang melalui jalan terutamanya di Kawasan Pelabuhan Klang.

Kerjasama bersama pihak Kementerian Ekonomi dan Kementerian Kewangan juga bagi memastikan keperluan peruntukan yang disalurkan adalah bagi menyelesaikan isu kekurangan peruntukan terutamanya di jalan Kawasan Parlimen Klang. Untuk makluman Ahli Yang Berhormat, beberapa Jalan Persekutuan di Klang perlu dinaik taraf bagi menampung jumlah trafik yang tinggi dan menambah kekuatan kepada struktur jalan. Walau bagaimanapun ia tiada dalam senarai keutamaan negeri yang dikemukakan kepada kementerian ini melalui penyelarasan antara Bahagian atau Unit Perancang Ekonomi Negeri dan Jabatan Kerja Raya (JKR).

Sehubungan itu, saya menyeru Ahli Yang Berhormat supaya mengemukakan cadangan projek ini kepada pihak Kerajaan Negeri Selangor supaya cadangan berkenaan dapat dipertimbangkan dalam senarai keutamaan negeri yang dikemukakan kepada kementerian ini.

Kementerian Kerja Raya melalui Jabatan Kerja Raya komited dalam memastikan jalan sentiasa dalam keadaan yang selamat dan selesa dengan menjalankan kerja-kerja penyenggaraan rutin sepanjang tahun. Sekian, terima kasih Tuan Yang di-Pertua. Terima kasih Yang Berhormat Klang dan akan dapat membantu serba sedikit kepada Yang Berhormat Klang untuk apa yang kita jawab boleh dibawa ke peringkat negeri dan seterusnya kepada EPU. Terima kasih, Tuan Yang di-Pertua.

Mr Speaker? May I just say "thank you"?

Just "thank you" is fine.

I would like to record my thanks to the Honourable Minister for giving such a lengthy answer, full of – please, let us make a joint visit later to the Klang area.

Yes, insya-Allah, Honourable Member for Klang. I have already planned to go down and see for myself together with the Honourable Member.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

This is not a question-and-answer session, okay.

[Laughter]

Berbalas pantun.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Urgent attention and resolution of the issue of the Malaysian Indian Transformation Unit (MITRA)Special Chamber

Silakan.

Mr Speaker, it is informed that the Malaysian Indian Transformation Unit (MITRA), led by the Prime Minister's Department (JPM), is a special unit responsible for addressing the socioeconomic development issues of the Indian community in Malaysia. Subsequently, in 2017, the Malaysian Indian Community Action Plan (MIB) was launched to document the challenges and issues faced by the Indian community along with proposed solutions. In September 2022, MITRA was transferred back under the supervision of the JPM.

One of MITRA's main focuses is towards improving the standard of living of the Malaysian Indian community in line with the national development agenda. The initiatives designed by MITRA will enable more members of the community to get involved in digital entrepreneurship, adapt to the latest business environment, and be better prepared for new employment opportunities.

According to the Minister of Human Resources, V. Sivakumar, who is also the Member of Parliament for Batu Gajah, the equity of the Indian community so far is only 1.15 per cent compared with the target of three per cent. “The intervention and involvement of the Prime Minister's Department and also MITRA are necessary to draft strategic plans, implement those plans systematically and carry out close monitoring to ensure that the Indian community is not left behind from the progress to be enjoyed by the ‘Keluarga Malaysia’,” he said in a statement.

The Indian community in this country has long criticised the misappropriation and misuse of funds allocated to MITRA.

However, this matter seems to have received no attention from the authorities.

Tens of millions of ringgit in allocations to the agency should have been sufficient to improve the socioeconomic status of the Indian community in this country. Unfortunately, it has been misused and has not reached the target group. Furthermore, it has previously been clearly stated that governance practices and the monitoring of the evaluation and implementation process of programmes by MITRA are very weak. This effort must be improved by ensuring there is no leakage and abuse of power, so as to ensure a fair and equitable sharing of the nation's prosperity through the concept of Malaysia Madani.

Thus, I would like to seek the kind assistance of the government, namely the Prime Minister's Department

(i) how much allocation has been provided for MITRA and how will that distribution be coordinated;

(ii) what comprehensive strategy is there to ensure that no leakage or abuse of power will occur in the future;

(iii) what are the short-term and long-term development plans for the Indian community;

(iv) how many officers will be appointed to manage the administration of this fund; and

(v) what will be the impact of the results of implementing this action plan on the Indian community in the future?

Thank you.

I ask the Honourable Deputy Minister to respond.

Datuk Ugak anak KumbongPRS · GPSDeputy Minister in the Prime Minister's Department (Sabah, Sarawak and Special Duties) · Hulu RajangEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Klang. The government has allocated RM100 million for 2023 for the Malaysian Indian Community Socioeconomic Development Programme (PPSMI), which has been implemented through the Malaysian Indian Transformation Unit (MITRA). The allocation is distributed based on three scopes, namely:

(i) Human Capital Development;

(ii) Entrepreneurship and Career Development;

(iii) Social and Welfare Development, Spirituality and Community Well-being of the Indian community.

This PPSMI is in line with the core of Malaysia Madani, namely “Rebuilding the Economy and Guaranteeing the Well-being of Humanity”, which will be implemented in an integrated manner based on the Twelfth Malaysia Plan (RMK-12), Chapter 5, Strategy B3, namely improving the standard of living of low-income Indian households

Datuk Ugak anak KumbongPRS · GPSDeputy Minister in the Prime Minister's Department (Sabah, Sarawak and Special Duties) · Hulu RajangEN

low-income. MITRA uses two methods in implementing PPSMI, namely:

(i) programme initiatives designed and implemented by MITRA with the cooperation of identified agencies and organisations; and

(ii) a grant application programme opened to eligible organisations.

Mr Speaker, MITRA has taken corrective action to ensure there is no leakage or abuse of power. Among the actions taken are the following:

(i) MITRA has refined the MITRA Financial Grant Management Guidelines based on advice from the Malaysian Anti-Corruption Commission (SPRM);

(ii) grant applications are only opened online and are accepted within the application period only. Manual applications will not be accepted;

(iii) filling of positions by civil servants appointed by the Public Service Commission (SPA) and no political appointments;

(iv) increasing the frequency of on-site programme monitoring, strengthening documentation and cross-checking of programme reports, including verification of the authenticity of information submitted by organisations;

(v) establishing written criteria on the amount that can be applied for by organisations. The ceiling set for grant applications by organisations in the current year is RM300 thousand only;

(vi) including clauses relating to section 18 of the MACC Act 2009 and the penalties under section 24 of the MACC Act 2009 in contracts;

(vii) MITRA also provides Guidelines for Blacklisting Organisations (blacklisted) and Individuals who fail to implement programmes previously approved; and

(viii) engagement sessions with organisations that also involve the SPRM.

For MITRA's administration, the existing establishment warrant is 27 posts, of which 17 have been filled while the remaining 10 posts are under action by the Prime Minister's Department (JPM). In addition, the JPM has approved six MySTEP officers to support MITRA's governance.

The government hopes that with the implementation of PPSMI, based on the two strategic cores of “Rebuilding the Economy and Guaranteeing the Well-being of Humanity” under the concept of Malaysia Madani, the socioeconomic status of the Indian community can be improved. Thank you, Mr Speaker.

Silakan.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Malaysia-Thailand Border ControlSpecial Chamber

Bismillahi Rahmani Rahim.

Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, being Mr Speaker this afternoon. To the people of Malaysia and young people, how are you?

Mr Speaker, Football, League Cup, I will read question number three. I urge the government to give full attention to the Malaysia-Thailand border area. The Malaysia-Thailand border stretches from Perlis to Kelantan. It is estimated to be 656 kilometres long but only 111 kilometres of it is fenced. Most of the border area is undeveloped, and with hilly mangrove and dense forest, it has no clear fence or border wall. This situation will give room for smuggling activities, whether of humans, goods, animals or plants.

Lack of and weak coordination of enforcement patrols, rusted and easily cut barbed-wire fences, and the absence of closed-circuit televisions (CCTV) along the border are also the main causes of smugglers being able to penetrate the country's border easily. Meanwhile, some sections of the border wall between Malaysia and Thailand along the Security and Development Corridor (KESBAN) are seen as old, in addition to detection equipment that is not well supervised.

Several past incidents, such as the shooting incident at the Padang Besar border, Perlis in 2020 which claimed the life of a General Operations Force (PGA) member during a patrol and intelligence operation against kratom smugglers, and the discovery of mass graves at Wang Kelian in 2015, also prove that security at our border is very weak.

After the discovery of the mass graves at Wang Kelian, the government should have built and repaired fences and border walls, added CCTV and several other security aspects, but it is still not comprehensive. At the same time, there are still many rat trails used by smugglers at the Malaysia-Thailand border.

Therefore, a review of the status of construction of the border wall between Malaysia and Thailand must be carried out immediately so that bloody tragedies like those before do not happen again.

The Malaysian Government previously gave a commitment to build the border wall, but until now there is still no comprehensive and detailed development plan announced. Therefore, I request that the government take this matter seriously by expediting the comprehensive development of the Malaysia-Thailand border wall and ensuring a comprehensive plan covering all government agencies for

border control of Malaysia-Thailand so that it is truly effective in guaranteeing border security and the sovereignty of the nation.

Thank you. Assalamualaikum.

I ask the Honourable Minister to respond.

Datuk Ugak anak KumbongPRS · GPSDeputy Minister in the Prime Minister's Department (Sabah, Sarawak and Special Duties) · Hulu RajangEN

Thank you, Mr Speaker. Thank you to my friend, the Honourable Arau. Thanks are conveyed to the Honourable Member, who is always concerned about the country's border security, and to the actions taken by the government in ensuring that the security and sovereignty of our nation are guaranteed, Honourable Member.

For the information of the Honourable Member, the government is always proactive and responsible in ensuring that the security and sovereignty of the nation are always protected and preserved. The government takes seriously the incidents that occur at the nation's border, which require immediate action from the responsible parties.

Accordingly, the government is now undertaking new development and upgrading of existing border walls or security fences along the Malaysia-Thailand border in the states of Perlis, Kedah and Perak, involving an estimated distance of 110.7 km in areas identified as technically suitable for the construction of border walls or security fences.

As a land border security control mechanism, the Government will continue bilateral cooperation with the Government of Thailand through the General Border Committee (General Border Committee)

(GBC MALTHAI), which is co-chaired by the Defence Ministers of both countries.

At the same time, the Government will also continue security control cooperation involving the security forces of both countries, such as cooperation between the Malaysian Armed Forces (ATM) and the Royal Thai Army (RTA) under the Combined Force Border Patrol programme (CFBP MALTHAI), in playing a role to maintain and enhance the level of security and well-being of the people in our border areas.

Thank you, Honourable Member.

Honourable Member, Mr Speaker? May I?

No. We have no supplementary questions.

Because I want to ask, will he implement fast-track tenders?

Standing Order 4: no interjections are allowed.

Terima kasih.

Silakan.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — First Home for MalaysiansSpecial Chamber

Mr Speaker, thank you. Malaysians and young people all. I would like to bring to the attention of the Ministry of Local Government Development (KPKT) the issue of affordable home ownership. I hope the government can study and plan special initiatives to ensure every citizen, especially the B40 and M40 groups, is able to own their first home by providing affordable homes priced at RM200,000 and below, both outside and inside the city. This is especially for young people.

The National Housing Policy (2018-2025) itself acknowledges that the issue of housing affordability is increasingly significant among the people, and the impact of the sudden rise in house prices is also felt by the M40 group in addition to the B40, with permission. Special initiatives to provide first-home facilities at prices of RM200,000 and below should be made one of the focal points of the review of the National Housing Policy and require input from various ministries as well as non-government parties.

The issue of first-home affordability, if not addressed, will create a generation of citizens, especially young people, who are constantly renting without the opportunity to own their own home. This group will continue to fall victim to soaring property prices caused by property speculation without price control, so that prices are beyond the real capacity of the M40 and B40 groups, with permission.

The "Council Home" or "Rumah Majlis" model introduced by DBKL can be practised outside Kuala Lumpur by the government to help groups who cannot afford to rent homes cheaply in urban areas.

In addition, the government also needs to encourage developers to build homes with a "Rent-to-Own" concept, with permission, which has the potential to increase access to housing for the B40 and M40 groups.

Earlier this year, KPKT announced that it would bring in Singapore's Housing and Development Board (HDB) for partnership and advisory services to improve the national housing system.

Has our country run out of experts in the housing sector? The government is expected to state clear justification as to why Singapore's HDB was chosen and not housing agencies from other countries, and whether it involves costs borne by the government?

At the same time, I ask the government to give attention to Perbadanan PR1MA Malaysia (PR1MA). Since 2018, PR1MA has experienced serious financial constraints due to the inconsistent disbursement of government funds, to the extent that it had to issue sukuk to cover the costs of affordable housing construction projects.

Therefore, PR1MA has had to bear high additional costs that are burdensome. In addition, PR1MA has also given discounts on selling prices to meet buyers' affordability.

Therefore, is this direction adequate for PR1MA to shoulder the mandate of providing affordable housing today? Along with that, the government should give full support to PR1MA by channelling development funds for the provision of affordable housing. That is all, thank you. Assalamualaikum.

Honourable Deputy Minister, please respond.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

Thank you, Mr Speaker.

Considering that the Honourable Arau is an "old hand" with experience, I will try to answer in as much detail as possible. So, it may take a little time.

For the information of the Honourable Member, the government is always committed to providing Affordable Homes (RMM), especially for the B40 and M40 groups. The programme to provide RMM continues, with a target of 500,000 RMM units to be completed during the Twelfth Malaysia Plan (RMKe-12) period. This programme involves the cooperation of all housing provider agencies at the Federal Government, state government and private sector levels.

In this regard, the Ministry of Local Government Development (KPKT) has been entrusted as coordinator for the provision and reporting of RMM to be implemented by housing provider agencies at the Federal Government, state government and private developer levels. Among the RMM projects under KPKT are:

(i) Program Perumahan Rakyat (PPR). Up to 31 January 2023, there were 159 projects comprising 99,296 housing units completed. A total of 24 projects are under construction comprising 9,737 housing units, while three projects involving 2,300 housing units are still at the planning stage;

(ii) Rumah Mesra Rakyat (RMR) Programme. This programme is implemented by Syarikat Perumahan Negara Berhad (SPNB) and can benefit B40 groups who have their own land or land owned by family members with permission. Up to 31 January 2023, there were 55,055 RMR units completed, 4,181 units under construction and 657 housing units in planning;

(iii) PR1MA Housing Programme. This programme is an RMM programme for the M40 group implemented by PR1MA. Up to 31 January 2023, there were 24,977 housing units completed, 17,595 housing units under construction and 7,783 housing units in planning; and

(iv) SPNB Residences. This programme is implemented by SPNB and is an RMM programme for the M40 group. Up to 31 January 2023, there were 28,472 housing units completed, 362 housing units under construction, while another 1,492 housing units are at the planning stage throughout the country. Taking into account the needs of the people and the current economic position, KPKT will continue to focus on access to quality and affordable housing to meet the needs of the people.

At the policy level, KPKT has introduced the Affordable Housing Policy (DRMM). Through this DRMM, the Government has introduced and set a price ceiling for RMM at RM300,000. However, this RMM price ceiling is also subject to housing policies at the state level.

In addition, for the information of the Honourable Member as well, KPKT is reviewing the National Housing Policy (DRN) (2018-2025). The review of this housing policy is based on the essence of building Malaysia Madani, so that the direction of this policy can be translated into values of well-being and balance for all groups of Malaysians.

KPKT has also conducted engagement sessions with stakeholders and utilised the experience of expert panels in efforts to review the DRN. The housing aspects that are the focus are availability, affordability, accessibility, quality and liveability, also known as the 5K. All these aspects cover the entire housing ecosystem, from the provision of affordable and quality housing to the aspect of ownership or rental in liveable neighbourhoods.

Improving housing accessibility is also a focus of this ministry as one of the agendas in the DRN to meet the needs of the people. For the information of the Honourable Member, to help first-time home buyers, KPKT, in collaboration with the Ministry of Finance, has launched the Malaysia Housing Financing Initiative (i-Biaya).

One of the initiatives under i-Biaya is the Housing Credit Guarantee Scheme (SJKP), namely housing financing without the need to pay a down payment, offered to groups without a fixed income or the gig economy. Furthermore, under Budget 2023 Madani, the Government will continue to provide incentives through the i-Miliki initiative. For this year, it involves full exemption from stamp duty for

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor Bahru

keluarga yang diberi kebenaran. Sehingga 31 Januari 2023, terdapat 55,055 unit RMR telah siap dibina, 4,181 unit dalam pembinaan dan 657 unit rumah dalam perancangan;

(iii) Program Perumahan PR1MA. Program ini merupakan program RMM untuk golongan M40 yang dilaksanakan oleh PR1MA. Sehingga 31 Januari 2023, terdapat 24,977 unit rumah telah siap dibina, 17,595 unit rumah dalam pembinaan dan 7,783 unit rumah dalam perancangan; dan

(iv) Kediaman SPNB. Program ini dilaksanakan SPNB dan merupakan program RMM untuk golongan M40. Sehingga 31 Januari 2023, terdapat 28,472 unit rumah telah siap dibina, 362 unit rumah dalam pembinaan manakala 1,492 unit rumah lagi di peringkat perancangan di seluruh negara; Mengambil kira keperluan rakyat serta kedudukan ekonomi semasa, KPKT akan terus giat memberi tumpuan kepada akses terhadap perumahan yang berkualiti dan mampu dimiliki untuk memenuhi keperluan rakyat.

Di peringkat dasar, KPKT telah memperkenalkan Dasar Rumah Mampu Milik (DRMM). Melalui DRMM ini, Kerajaan telah memperkenalkan dan menetapkan siling harga RMM pada RM300,000. Walau bagaimanapun, siling harga RMM ini turut tertakluk kepada dasar perumahan di peringkat negeri.

Selain itu, untuk makluman Yang Berhormat juga, KPKT sedang mengkaji semula Dasar Perumahan Negara (DRN) (2018 -2025). Kajian semula dasar perumahan ini adalah berdasarkan rangkuman inti sari membangun Malaysia Madani supaya hala tuju dasar ini dapat diterjemahkan dalam bentuk nilai kesejahteraan dan keseimbangan untuk semua golongan rakyat Malaysia.

KPKT turut melaksanakan sesi libat urus dengan pihak-pihak berkepentingan dan memanfaatkan pengalaman panel berkepakaran dalam usaha melaksanakan kajian semula DRN. Aspek perumahan yang menjadi fokus ialah ketersediaan (availability), kemampuan kewangan (affordability), kemudahan pembiayaan (accessibility), kualiti (quality) dan kediaman berdaya huni (liveability), yang juga dikenali sebagai 5K. Kesemua aspek ini merangkumi seluruh ekosistem perumahan bermula daripada penyediaan kediaman yang mampu milik dan berkualiti sehingga aspek pemilikan atau sewaan di kawasan kejiranan yang berdaya huni.

Peningkatan aksesibiliti perumahan turut menjadi fokus kementerian ini sebagai salah satu agenda dalam DRN bagi memenuhi keperluan rakyat. Untuk makluman Yang Berhormat, bagi membantu pembeli rumah pertama, KPKT dengan kerjasama Kementerian Kewangan telah melancarkan Inisiatif Pembiayaan Perumahan Malaysia (i-Biaya).

Salah satu inisiatif di bawah i-Biaya ini adalah Skim Jaminan Kredit Perumahan (SJKP) iaitu pembiayaan perumahan tanpa perlu membayar wang pendahuluan yang ditawarkan kepada golongan yang tidak mempunyai pendapatan tetap atau kumpulan gig ekonomi. Seterusnya, di bawah Belanjawan Madani 2023, Kerajaan akan meneruskan pemberian insentif melalui inisiatif i- Miliki. Bagi tahun ini, ia melibatkan pengecualian sepenuhnya duti setem bagi

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

first home ownership valued at RM500,000 and below, while a 75 per cent stamp duty exemption applies to first home ownership valued at RM500,000 to RM1 million.

For the information of the Honourable Members, based on information obtained from Bank Negara Malaysia (BNM), banks continue to support home ownership in Malaysia, with more than RM60 billion disbursed to first-time home buyers in 2021. Of that amount, two-thirds of the new loans that

I didn't hear that just now...

Tiada pencelahan.

Billion or million?

Billion. Sorry.

With more than RM60 billion. That shows the Honourable Arau follows every detail I read.

Menghayatilah.

So of that amount, two-thirds of new loans approved are for the mass-market segment, or in other words, homes priced at RM500,000 and below.

Various types of financing schemes are provided with the cooperation of the government or by financial institutions themselves to help eligible home buyers, especially first-time home buyers, youth or low-income segments. Financial institutions are actively developing suitable initiatives to facilitate home ownership for the B40 group, such as loans to build homes on one's own land, collaborating with state governments and/or housing developers in providing suitable financing products for low-income groups, as well as exploring the use of social funds as one of the RMM financing solutions.

For the information of the Honourable Members as well, KPKT has introduced two rent-to-own (RTO) housing programmes, or Rent-to-Own (RTO) schemes, namely RTO PPR and RTO Perbadanan PR1MA Malaysia.

First, RTO Program Perumahan Rakyat (PPR). The RTO PPR scheme was introduced in 2017 and is a simple financing scheme specifically to help B40 income groups own homes, who have been offered PPR units but failed to obtain financing from any financial institution. The RTO PPR scheme has been implemented in 14 PPRs throughout the country involving 6,066 housing units. Up to 31 December 2022, a total of 4,690 families had been offered the RTO PPR scheme throughout the country.

RTO Perbadanan PR1MA Malaysia (PR1MA). The RTO PR1MA Financing Scheme was introduced through the announcement of Budget 2021 to increase home ownership among M40 citizens. Through this scheme, prospective buyers facing loan problems have the option to rent

for the first five years at a reasonable rental rate before buying the house with full financing. This RTO scheme is open to all prospective PR1MA home buyers for selected projects, namely those that have been completed throughout the country. Up to 31 January 2023, 16 projects under the RTO PR1MA Scheme are being offered.

KPKT is also planning the construction of Rumah Belia Madani (RBM) in the Klang Valley area. The RBM initiative is a Government initiative in providing transit housing for youths aged 35 years and below to occupy the house for a period deemed sufficient for them to strengthen their financial position and subsequently own their own residence. The first RBM will be developed at Mukim Batu, Sentul, involving the development of 1,048 housing units.

The Honourable Member also asked for justification as to why Singapore's HDB was chosen and not housing agencies from other countries to obtain partnership and advisory services. For the information of the Honourable Member, during the previous Government's administration, KPKT also carried out several knowledge-sharing sessions with the Ministry of Land, Infrastructure and Transport (MOLIT) and the Housing and Urban Guarantee Corporation (HUG) of South Korea, and with housing-related agencies in Australia on mechanisms and policies for private housing development and the Residential Tenancy Act, as well as with the Singapore housing agency, the Housing and Development Board (HDB).

The engagement session with HDB began in 2018 through visits to the neighbouring country to understand housing planning and provision, especially in social housing. For the information of the Honourable Member as well, HDB has received various awards and international recognition related to the housing sector. Among them:

(i) Special Recognition Award by an international jury in Munich, Germany (2016) for successfully developing a stratified development model;

(ii) Landscape Award from the International Federation of Landscape Architects Africa, Asia Pacific & Middle East Awards (2022);

(iii) Universal Design (UD) Excellence Award (2022);

(iv) Bronze Award at the 2021 International Design Awards (Architecture-Urban Design Category) (2022); and

(v) various public sector transformation awards in Singapore for digitalisation, innovation and customer-friendliness.

Knowledge and experience-sharing sessions like these give KPKT room to study and examine new perspectives, as well as to learn best practices in the housing sector in other countries.

Therefore, KPKT will continue this series of experience and knowledge-sharing sessions to ensure that more comprehensive and practical policies and actions are prepared within the context of housing needs in Malaysia. As for the issue of cost bearing, for the information of the Honourable Member, the session

the partnership to be held does not involve the payment of any remuneration to HDB.

For the further information of the Honourable Member, the government will continue to support the PR1MA housing programme to ensure the adequate provision of RMM. In 2019, PR1MA implemented a holistic Transformation Plan aimed at improving the efficiency and effectiveness of PR1MA's services in providing high-quality and affordable housing to the middle-income group (M40). Through this transformation plan, PR1MA has strengthened its financial cash flow and improved existing projects to ensure they meet market demand, particularly for the target M40 group.

Recently, PR1MA has developed a new business model that is inclusive and sustainable, through joint ventures with experienced and reputable contractors. Among the recent development models that are being and will be implemented are Transit-Oriented Development (TOD), PR1MA Mini Township and Retirement Village.

Seed capital injection in the form of recoupable seed capital from the government will reduce PR1MA's dependence on government funds in the long term. This will help PR1MA continue its mandate in meeting the national affordable housing agenda to achieve the targets of the RMKe-12. That is all, thank you, Mr Speaker.

Thank you, Honourable Deputy Minister. Honourable Members, the sitting of the Special Chamber (Kamar Khas) today is adjourned until Monday, 20 March 2023, at 2.30 pm. Thank you.

Assalamualaikum.

[The Special Chamber (Kamar Khas) was adjourned at 3.25 pm]