(Opening)

[Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) presided over the Sitting]

Oral QuestionsQuestions

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Bismillahi Rahmani Rahim. [Selawat] Assalamualaikum and good morning, Honourable Members. We begin today's agenda with oral questions. I invite the Honourable Member for Kluang, Puan Wong Shu Qi.

Wong Shu QiDAP · PHKluang · questionEN

1. Puan Wong Shu Qi [Kluang] asks the Minister of Natural Resources, Environment and Climate Change to state the measures taken by the government, and the cost of implementation, to achieve the target of 31% renewable energy (RE) in installed capacity by 2025.

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources, Environment and Climate Change · SetiawangsaEN

Thank you, Honourable Member for Kluang. Mr Speaker, for the information of Honourable Members, in order to realise the target of increasing the share of renewable energy (TBB) capacity to 31 per cent by 2025, the government has implemented the following measures: (i) introducing the Malaysia Renewable Energy Roadmap (MyRER), or, with permission, the Malaysia Renewable Energy Roadmap (MyRER), as the guiding document for the implementation and development of TBB nationally; (ii) developing special programmes and initiatives to increase the participation of electricity consumers and local TBB industries in the generation and purchase of green electricity supply through the feed-in tariff, net energy metering, Green Electricity Tariff and Corporate Green Power Programme; (iii) gradually reducing electricity generation capacity from coal sources and replacing that capacity either with TBB generation sources or low-carbon sources. In the previous JETP, we announced no new coal plants for our country; and (iv) strengthening grid flexibility through digitalisation efforts and the integration of the latest technology to enable higher capacity from TBB sources to be accommodated.

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources, Environment and Climate Change · SetiawangsaEN

In terms of cost, the estimated implementation of initiatives under MyRER is RM20 billion by 2025 and RM33 billion by 2035. Recently, when launching the Malaysia Energy Transition Outlook report, eight catalytic initiatives for the TBB industry were announced as immediate measures to support the energy transition, namely the approval of an additional quota allocation of 630 megawatts. For the implementation of renewable energy generation projects, 180 megawatts is for the development of small hydro, biogas and biomass power generation under the feed-in tariff; 200 megawatts for the Corporate Green Power Programme (CGPP) to enable more companies to subscribe to green electricity to meet their ESG commitments; 200 megawatts for the NEM Nova programme to further encourage the installation of solar on the rooftops of building premises for the commercial and industrial categories. Next, 50 megawatts for the NEM Rakyat programme to enable more domestic consumers to install solar systems at residential premises (rooftop solar). Next, we have also set the framework for third-party access in the fourth quarter of 2023. This is something the industry has long awaited. This enables corporate companies with ESG commitments to obtain green electricity supply directly from TBB developers through existing transmission or distribution networks, improves the NEDA mechanism, particularly the Corporate Green Power Programme, to enable applications and participation in this programme to be made throughout the year, and allows participation by TBB developers from non-solar sources. Next, enhancing the implementation of communication, education and public awareness programmes to encourage the installation of solar systems among domestic consumers, studying proposals to establish an energy transition fund or energy transition fund, and several other initiatives with the aim of further accelerating the energy transition in our country.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Supplementary question, Honourable Member.

Puan Wong Shu QiDAP · PHKluangEN

Thank you, Mr Speaker. Thank you for the complete and good answer from the Minister. I do feel we are on the way to the right direction. However, I would like to know, since our target is 31 per cent by 2025, what level we are at this year. This is important so that everyone outside knows how far the gap still is. Most importantly, from the Minister's answer just now, I heard there are many policies to encourage the private sector to take the initiative to use or generate this renewable energy. However, what about all government buildings (public sector)? Whether we will – not mandatory, there is no need to make it mandatory, but encourage schools and also PBT, hospitals and so on, to take the initiative to encourage...

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, ask your question.

Puan Wong Shu QiDAP · PHKluangEN

...use and also generation of renewable energy. Thank you.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Honourable Member for Kluang. Currently, our TBB capacity level is 25 per cent, which is the latest figure we have, compared with our target of 31 per cent by 2025. On how we can further encourage this, in fact, the government does have many buildings in Putrajaya specifically; we have hospital, school and university buildings, for example. Some have already taken the initiative themselves to install.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Now, first, we are providing a government-specific NEM programme for the government sector, but I think we will try to intensify it so that more of this solar energy can be exploited as our energy source. For information, so far, when we talk about solar, we often think about large-scale solar; we need to take large land or ponds to place solar panels. However, in Australia, for example, one of the most successful countries in the use of the solar sector, rooftop solar has already overtaken large-scale solar as one of the renewable energy sources. So, I think this is among the easiest things for us to take note of in order to accelerate our energy transition.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Supplementary question, the Honourable Member for Kota Bharu.

Thank you, Mr Speaker. Thank you, Honourable Minister, my friend, for the answer given. I would like to seek confirmation from the Honourable Minister regarding the target of achieving 31 per cent RE by 2025. At present, the existing policy in our country is not to allow the export of RE to foreign countries, particularly to Singapore. I heard news recently that the Honourable Minister, through the ministry, plans to change this policy, to obtain views from the public and so on, on whether to change it. I want to know, will this policy be changed by the government? Whereas this policy has greatly helped the entry of the RE industry into Malaysia by not exporting outward. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Honourable Member for Kota Bharu. We are all mourning together as Liverpool fans, yes. Thank you for the good question asked just now. For us, when we talk about this policy, firstly, for now the existing policy, namely that there is no export of TBB or RE, still applies. However, the government is studying it because there are several requests, including, for example, from the state of Sarawak to export RE. So, we want to look at it in the overall framework. Recently, we are also aware that Cambodia and also Indonesia have signed either MOUs or agreements with Singapore to export RE. Our explanation on this is simple. If we change this RE export policy, firstly, it must be done on our own terms. Malaysia's terms. That is the first thing I want to explain, with permission. Secondly, it is not about this being a limited or finite amount. However, if exports take place like other trade, it would enable us to scale up renewable energy capacity. We must note that, even now with the policy, although we have revised the tariff for the industrial and commercial sectors using high and medium voltage recently, our tariff in that sector still has subsidies. So, that is among the constraints to enable our RE sector to grow, because they cannot sell the energy they generate at a commercial price. However, in countries like Singapore, it is at market price. There are many, for example, who want to use the latest technologies to overcome constraints, for example solar energy. Solar energy only works for four hours, during their peak hours, when they can generate the most effective energy. Now there is battery storage technology, but its cost is high. If done using domestic-level tariffs, it is still not attractive. So, that matter needs to be looked at. But what is certain is that we will ensure that in any decision made, we will look at ensuring the national interest is protected. We do not want to sell everything, if

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

yes. We can sell a portion to Singapore and the rest distributed to industries in our country.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Next, I invite the second question, Tuan Wan Ahmad Fayhsal bin Wan Ahmad Kamal, the Honourable Member for Machang.

Wan Ahmad Fayhsal bin Wan Ahmad KamalBERSATU · PNMachang · questionEN

2. Tuan Wan Ahmad Fayhsal bin Wan Ahmad Kamal [Machang] asks the Minister of Foreign Affairs to state whether the Federal Government will continue efforts to find a solution to the conflict in Myanmar that was initiated by the previous government.

Dato Sri Diraja Zambry bin Abd KadirMinister of Foreign AffairsEN

Mr Speaker, I thank the Honourable Member for Machang for the question raised. Malaysia's stance remains consistent in supporting efforts to find a solution to the conflict in Myanmar. The approaches taken, whether bilaterally or at the regional level, continue to be maintained. The government is aware that the Myanmar issue constantly receives extensive coverage from regional and international society. Therefore, Malaysia will continue the existing efforts in assisting Myanmar to achieve a solution to the conflict occurring in the country. These efforts include calling on all parties to return to the negotiating table in order to achieve a peaceful and lasting solution. Malaysia also views the situation in Myanmar as a regional problem that threatens the security, peace, progress and prosperity of ASEAN. Furthermore, the Myanmar issue should not become an obstacle to strengthening ASEAN's economic development. Therefore, Malaysia continues to adopt an approach of working together with ASEAN member states, particularly Indonesia, which is now the Chair of ASEAN, in addressing the Myanmar issue. At the ASEAN 41st Summit in Cambodia in November 2022, ASEAN leaders endorsed the ASEAN Leader's Review and Decision on the Implementation of the Five-Point Consensus. Among the substance of the decision is that the lead five PC remains the absolute reference of ASEAN and must be implemented in its entirety. Second, ASEAN leaders have tasked the ASEAN foreign ministers to develop an implementation plan that outlines practical indicators with specific timelines to support the lead five PC. The ASEAN Foreign Ministers' retreat in Jakarta on 4 February 2023 agreed to the implementation plan for the Five-PC, which focuses on ASEAN's efforts towards creating a conducive environment to open the way for inclusive dialogue involving all stakeholders in Myanmar, which can contribute to facilitating the delivery of humanitarian assistance to all people of Myanmar without discrimination. Malaysia will continue to play an important role at the multilateral level, especially on international platforms such as the UN and the OIC, in voicing the country's views so that the parties involved can find a constructive path towards a comprehensive solution to address the crisis in Myanmar. However, it must be reminded that efforts to resolve the conflict in Myanmar are not easy. This is because it involves many stakeholders and will take a long time. Overall, in line with the concept of Malaysia MADANI, which is based on humanity and noble values, Malaysia will continue its efforts and cooperation at the regional and international levels in seeking a peaceful and sustainable solution to the Myanmar issue. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Supplementary question, the Honourable Member for Machang.

Thank you, Honourable Minister. Firstly, I congratulate you on your victory at the UMNO Supreme Council meeting yesterday. My question: we know that the Rohingya refugees resulting from the crisis in Myanmar are causing many social problems in our country. I see a lot in the news that our State Assemblymen (ADUN) have to face various difficult problems, not only them but also the government and ordinary citizens. Health problems, security problems. So, recently, the Right Honourable Prime Minister raised a proposal to ASEAN to consider more drastic action for consideration by ASEAN members.

We do not want Myanmar to become a rogue state, with permission, which could further destabilise our region. So, is there a more drastic action, a proposal from Wisma Putra (Ministry of Foreign Affairs), for ASEAN's consideration? Yes, we also know that Russia and China are also involved in supplying aid or selling weapons. Does ASEAN intend to state to these major powers not to do so, in order to safeguard the interests in our region? Thank you.

Thank you for the supplementary question, Honourable Member for Machang. As we are well aware, the Myanmar issue is a very complex one that requires wisdom at the ASEAN level for us to resolve. This is because if we fail to address it collectively within the context of ASEAN, it will create problems that come from outside the ASEAN sphere. As mentioned by the Honourable Member just now, there are efforts by certain parties trying to enter Myanmar, and there will be a race to dominate geopolitics in the area concerned, which will cause a power race in the area concerned. Therefore, the approach taken in the context of Myanmar needs to be resolved in an ASEAN manner. It cannot be done by any one country alone without discussion within the context of the other ASEAN countries. For that reason, we held a series of discussions, including the most recent at the ASEAN Foreign Ministers' Meeting in February last, to discuss the best approach. However, in terms of our commitment, these efforts must continue to be based on the Five-Point Consensus that we have mentioned earlier. Thank you.

Deputy Speaker (Dato’ Ramli bin Mohd Nor)EN

Honourable Member for Kuala Selangor, please.

Datuk Seri Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, Mr Speaker, thank you, Honourable Minister. Once again, I raise the matter we discussed some time ago regarding how the Myanmar conflict has the potential to threaten the peace and prosperity of ASEAN as a whole. A rather different step, the Right Honourable Prime Minister proposed an effort for the time being, to carve out or to some extent remove Myanmar from ASEAN, which I consider a rather drastic step. I would like clarification from the Honourable Minister, to what extent can this be done within the spirit of ASEAN? Thank you, Honourable Minister.

Deputy Speaker (Dato’ Ramli bin Mohd Nor)EN

Honourable Minister.

Thank you for the question relating to carve out, which I have already addressed in my previous presentation.

What the Right Honourable meant when he delivered his speech in Thailand, I was there, the question raised, what was meant by carve out was not to expel Myanmar outright, but what the Right Honourable meant was that we, among the ASEAN member states, should not let the Myanmar issue get to the point where we cannot get out of the conflict that is happening. This means there are other priorities that need to be given, including in the context of economic relations; in the context of ASEAN, we need to think about how to develop economic cooperation at the ASEAN level that is more important to ASEAN at this time. At the same time, it cannot be denied that we also need to strengthen our efforts based on the 5PC that we have agreed to. This Five-Point Consensus has been discussed by ASEAN leaders every time, and we have emphasised that it should be continued because it has short-term and long-term goals for us to work towards. So, in other words, Honourable Member, in addressing the Myanmar problem, we need to continue our efforts. Let us not be disappointed, and I agree with both Honourable Members, we need to avoid the Myanmar issue becoming, with permission, another flashpoint in our region. So, that is what we hope, that it will not happen. Therefore, we need to use all our wisdom and be careful in handling this problem because there are powers outside that are lurking to enter at any time. Thank you.

Deputy Speaker (Dato’ Ramli bin Mohd Nor)EN

Thank you, Honourable Minister. Next, we move to the third question. I invite the Honourable Member for Kuala Pilah, Dato' Adnan bin Abu Hassan.

Adnan bin Abu HassanUMNO · BNKuala Pilah · questionEN

3. Dato' Adnan bin Abu Hassan [Kuala Pilah] asks the Minister of Youth and Sports to state the cross-ministerial efforts and cooperation being planned to enhance youth development in line with the New Youth Development Model 2030 (MBPB2030) to be launched this year.

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

In the name of Allah, the Most Gracious, the Most Merciful. Mr Speaker, the Ministry of Youth and Sports (KBS) constantly builds strategic cross-ministry cooperation in the aspect of youth development. Although KBS is seen as the lead agency for youth development, in reality that role must be coordinated jointly by other ministries and agencies as well. There are many issues that touch on the roles of other ministries in providing opportunities and benefits to young people. The implementation of this cross-ministry cooperation is guided by the Malaysia Youth Policy (DBM), which puts forward the concept of cross-implementer collaboration, with emphasis on empowering implementing groups or stakeholders, involving Federal Agencies and non-governmental organisations (NGOs), educational and research institutions, media groups, government-linked companies, private or corporate entities, youth NGOs, including individuals. In addition, cross-ministry cooperation is also emphasised in the New Youth Development Model 2030 (MBPB), which has strategies and initiatives that touch on the roles of all implementing groups. For the information of the Honourable Member, MBPB 2030 was developed as a complement to support and improve the mechanisms of DBM, combined with the strengthening and empowerment of futuristic, relevant and current concepts. MBPB 2030 places emphasis on youth issues particularly related to the challenges of the post-pandemic era, namely unemployment, employment, the economy, education, mental health and also the digital divide. For the year 2023, KBS will implement a total of 125 activities that will be carried out together with strategic partners such as the Ministry of Education, the Ministry of Home Affairs, particularly through the Malaysian Prison Department, Kementerian Kemajuan

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

Desa dan Wilayah through the implementation of the programme Social Entrepreneurship for Rural Youth (SERY), Kem Belia Sejahtera, Programme Belia Mencegah Ekstremisme, Projek Reben Kuning Kebangsaan and Inisiatif Intervensi Dari Belia Untuk Belia (Y2Y). All these programmes target youth participation of nearly 30,000 people. In addition, KBS leadership programmes also involve other ministries and agencies such as the Ministry of Higher Education, the Ministry of National Unity, the Ministry of Local Government Development, the Ministry of Transport, the Ministry of Women, Family and Community Development, and the Malaysian Teacher Education Institute. That concludes my reply, Mr Speaker, thank you.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

Thank you, Mr Speaker. The Honourable Deputy Minister of Youth and Sports stated that so far, out of the total youth population in Malaysia, only eight per cent of youth are active in associations and join youth organisations. My question is, what is the ministry's strategic plan to strengthen and empower existing youth organisations, for example district youth councils and state youth councils, in order to attract more youth from various races and religions not only to participate in the programmes organised but also to register as members of these organisations? Thank you.

Tuan Adam Adli Abd HalimPKR · PHHang Tuah JayaEN

Mr Speaker, a good question from the Honourable Member for Kuala Pilah. KBS's initiative to help, particularly youth organisations, achieve the KPI of five per cent that was recently set in terms of annual increase in membership of youth organisations, particularly through the Malaysian Youth Council (MBM), is that we are ready to help in terms of governance workshops conducted in every state. This is by the Office of the Registrar of Youth Societies (ROY), and also includes the Effective Management Course in every state, to train leadership and governance.

Tuan Adam Adli Abd HalimPKR · PHHang Tuah JayaEN

Then, through i-LEAD, for example, we also hold a young leaders convention for youth organisations to establish a platform for these young people to form associations. Apart from that, I hope also— among other approaches taken by the ministry is by diligently going to the ground. That can encourage even more youth to be approached to join and also participate with youth associations, especially when we go to the ground, many who come from these youth organisations will take part, namely the exposure and initiatives carried out at the level of the Ministry of Youth and Sports, Honourable Member. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. Please, the Honourable Member for Pasir Mas.

Thank you, Mr Speaker. I extend Happy Police Day to Mr Speaker and all members of the police force in Malaysia. Mr Speaker, I listened carefully to the reply from the Honourable Deputy Minister just now that the agendas to be raised in youth development include aspects of skills and job opportunities and so on. I think whoever forms the government, these are the youth issues that must be faced. Looking back on how we succeeded in bringing about Undi18 and through negotiations between parties, I give credit to the Honourable Member for Muar at that time. So, in formulating this policy, I think the new youth development model until 2030 is a major matter. How does the ministry view the involvement of these political parties that also have youth wings to be included in discussions and these engagement sessions? Thank you.

Tuan Adam Adli Abd HalimPKR · PHHang Tuah JayaEN

Thank you, Honourable Member for Pasir Mas. A very good question and view, I think. Undi18 has become a main topic. Even after the General Election (PRU), now we are faced with the state elections.

Tuan Adam Adli Abd HalimPKR · PHHang Tuah JayaEN

So everyone is still discussing the matter of youth participation and also political literacy among those who— especially who will become first-time voters a few months from now. We are racing against time. I am confident and KBS is always open in terms of engaging all parties concerned, the stakeholders in this youth sector. Cooperation, as long as it is in line with the youth policy, as long as it does not become a platform for spreading indoctrination or propaganda, then we are open in terms of cooperation, insya-Allah. Because, everyone knows at the KBS level, we are always open to the ministry's cooperation with— especially the state-level exco members is also very good and is maintained so that young people are not exposed to the hustle and bustle and a little of the stench of the political world. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

We move on to the next question.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker. I would also like to extend Happy Police Day to all members of the police force in Malaysia today. Flour for wrapping lepat kuih, Please give the answer to number four.

Azman bin NasrudinBERSATU · PNPadang Serai · questionEN

4. Dato' Azman bin Nasrudin [Padang Serai] asks the Minister of Transport to state what the ministry's role has been up to now in ensuring that the Kedah Aerotropolis Project continues in order to increase economic activity in Southern Kedah.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Greetings, good morning, Mr Speaker and Honourable Members. Mr Speaker, for the information of the Honourable Members, under section 5 of the Civil Aviation Act 1969 [Act 3] and the Civil Aviation (Aerodrome Operation) Regulations 2016, the power to permit the establishment of an aerodrome is vested under the authority of the Minister of Transport. Accordingly, any party wishing to establish and build an aerodrome must apply for permission from the Ministry of Transport, supported by comprehensive documents and information. A series of discussions and meetings have been held with the Kedah State Government to elaborate on the proposed development of KXP. At all times, the Ministry of Transport has informed the developer and the Kedah State Government that the proposed KXP development project is subject to the study of the National Airports Strategic Plan (NASP). In this regard, so far, the letter that has been submitted by the Kedah State Government to the Ministry of Transport is the letter dated 3 January 2021 requesting that the Ministry of Transport grant permission for the development of the KXP and Kedah Aerotropolis project by providing an exemption during the waiting period for completing the National Airports Strategic Plan (NASP) study or using the findings of earlier preliminary study data as an interim NASP. In this regard, KXP Airport City Holdings Sdn. Bhd. as the developer has continued the study and has finalised the study of KXP development and submitted to the Ministry of Transport the Kedah Aerotropolis Development Master Plan containing the technical and commercial report on 18 January 2023. After the Kedah Aerotropolis Development Master Plan was finalised, there has been no official application made by the Kedah State Government regarding the detailed establishment of KXP that clarifies the technical specifications, the airport concept, where this concept has been changed several times, financing, development period, airport operator, areas involved and other related information for the consideration of the Ministry of Transport.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

For any application for aerodrome development projects, including airports in Malaysia, the application must be made in accordance with the Civil Aviation Act 1969 and the related regulations. In this regard, the Ministry of Transport always adopts an open stance towards any development proposals from state governments or private investors that bring economic benefits, are competitive and contribute to sustainable development. That concludes my reply, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. Supplementary question, please.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Thank you, Mr Speaker, thank you, Honourable Minister of Transport. From the answer given by the Honourable Minister just now, it is clear that applications have been made since 2013 until 2023. So, for the information of the Honourable Minister, are the Honourable Minister and the Deputy Minister aware that there have been 51 steps since 2013, whether application letters or engagement sessions, between the state government and the federal agencies involved with the earlier proposed development of KXP, now called Kedah Aerotropolis? What is the latest development of the NASP study on the development of KXP and Kedah Aerotropolis?

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please, Honourable Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Firstly, Mr Speaker, I have said many times that— I have never said that there were no discussions, but an application must be an application for an aerodrome to the Ministry of Transport. That is what the Ministry of Transport has consistently said, that there has not yet been an official application for an aerodrome. The reports submitted were to obtain comments from the Ministry of Transport. However, after comments are given, there must be an official application to the Minister of Transport, whether to the former or to me, or at any time to any Minister of Transport. So, there has not yet been an official application to the Minister of Transport to obtain permission for an aerodrome. The reports that have been given or the applications that have been submitted or the approvals that have been given are only in principle by the National Physical Planning Council. There has not been any aerodrome application from the Minister of Transport because the comments have not been given permission by the ministry. That is what I have consistently stated and also the answers in this Parliament before this, even by the former Minister, the Honourable Member for Ayer Hitam too. So, Mr Speaker, the question of us rejecting does not arise. That is what I said. So, we must understand that there is a process. So far, the NASP is not yet finalised. I also do not know yet, Honourable Member. The NASP has not yet been submitted to me because the NASP has not yet been finalised. That is the answer I want to give to the Honourable Member. Thank you.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Mr Speaker, a little more.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please, the next question. Supplementary question, please.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Okay. Thank you, Honourable Minister, for the explanation just now. Because I refer to the winding-up delivered by the Minister himself at the MOT winding-up session, "There has never been an application". However, never mind.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Based on what the Honourable Minister just said, we request that this project, which has already had many engagement sessions, and according to the SOP the airport operator must be applied for, and the airport operator must be determined by the state government through a special purpose company (SPV) to be established together with the investor. So, the determination of the company that will invest will be decided by the state government. However, during the winding-up reply, the Honourable Minister said, "Please bring the investor to meet me". So, I ask that there be no more conflict on this issue. And the NASP study be carried out well, and can also be referred to the consultants that have been engaged by the state government on the 'developability' of this KXP for the future of the state of Kedah, the economic development of Southern Kedah and so on. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, Mr Speaker. Although this is a precedent that has never happened because there were two supplementary questions by the same Honourable Member, nevertheless, I will answer. What I answered during the winding-up was that there has not yet been an official application regarding the aerodrome, that is what is consistently said. I hope, Mr Speaker, that this matter is not played with and not politicised by the Menteri Besar of Kedah. That is what I said, bring the operator. Who is the operator to be appointed as operator, because they want to obtain the aerodrome licence and furthermore there must be approval from MAVCOM and also from CAAM. It must be identified, it must be known who the operator is. We must understand the model of airports, the operation of airports in our country. So far in our country, there are only two operators, namely MAHB. All airports in our country are operated by Malaysia Airports Holdings Berhad, a government-linked company, GLC. There is only one other airport that is not operated by MAHB, namely the airport at Senai. So, there is no other operator yet apart from these two companies. So we must know who will operate this KSP and their capability, their financial capability and so on. It is said there are investors and so on. So, we state that we have an open stance. If there is an operator, meet with the Ministry of Transport, present their capability, their reports and so on. So, we will consider from that. So I hope, Mr Speaker, that this matter is not politicised and not made into political capital. We want to facilitate. If they have the capability and it is in line with the NASP report, there is no problem for the Ministry of Transport to give approval. However, so far, the NASP has not yet been finalised. So, there is nothing yet that we can implement before the NASP is finalised. So in the meantime, we say we can facilitate meeting with any party and the reports that have been given before can be used as a reference. However, we consistently state that an official application still needs to be submitted to the Honourable Minister of Transport. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Supplementary question from the right side, the government side. If there are none, I will give it to the left side, the opposition side.

Tuan Jamaludin bin YahyaPAS · PNPasir Salak

Pasir Salak.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

If there are none, I invite the Honourable Member for Pasir Salak.

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

Thank you, Mr Speaker. Happy Police Day. Honourable Minister, my question is, to what extent is the government's effort

Tuan Jamaludin bin YahyaPAS · PNPasir SalakEN

in encouraging more airlines to establish Shariah-based flight SOPs? For example, Malaysia Airlines (MAS) which sets flight SOPs to Jeddah that must begin with the recitation of prayers.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Mr Speaker, that question has strayed from the topic of KXP. Nevertheless...

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, you may choose not to answer.

Tuan Loke Siew FookDAP · PHSerembanEN

Yes, in terms of Shariah compliance and so on, it is up to any airline. The Ministry of Transport has no problem and no objection to any airline that wishes to adopt a model or any approach that complies with Shariah compliance. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

I want to remind the House that, when it comes to oral questions, supplementary questions and follow-ups, there must be relevance. If there is no relevance, the Honourable Minister may choose not to answer at all. I will allow the non-answer. Take note, especially those who are new in the House and also those who are old, as a reminder. Apart from that, I would like to take this opportunity to extend to the Royal Malaysia Police (PDRM), happy celebrating the 216th Police Day. [Applause] As the Honourable Ketereh, a veteran of the Malaysian Armed Forces, I too am a retired police veteran. [Applause]. The struggle is not yet over. For PDRM, I am also regretful. However, the Minister and Deputy Minister understand. We continue to the Honourable Member's fifth question. I understand Datuk Seri Saravanan a/l Murugan is not present. However, I will follow my practice. The Honourable Datuk Seri Saravanan, first call, second call, third call, is not in the House, so I go straight to the sixth question. Dato' Haji Mohd Suhaimi bin Haji Abdullah, the Honourable Member for Langkawi, please. [Question No. 5 – Honourable Datuk Seri Saravanan a/l Murugan (Tapah) absent]

Mohd Suhaimi bin AbdullahBERSATU · PNLangkawi · questionEN

6. Dato' Haji Mohd Suhaimi bin Haji Abdullah [Langkawi] asks the Minister of Home Affairs to state the right to treatment for persons with disabilities (OKU) who are involved in drug addiction. It is reported that the AADK rehabilitation centre does not accept OKU as patients. Will the government take action to build a rehabilitation centre specifically for persons with disabilities?

Datuk Seri Dr. Shamsul Anuar bin NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Bismillahi Rahmani Rahim. I would like to take this opportunity first, Mr Speaker, to record Police Day's 216th anniversary. The contributions and sacrifices of police personnel are very great to the nation and the people. Thank you, Honourable Langkawi. It is the government's intention to provide addiction treatment and rehabilitation services to all Malaysians who need them, regardless of status. This means the rights of the people, including persons with disabilities (OKU), are maintained and protected. The government, through the National Anti-Drugs Agency (AADK), has established 30 Narcotics Addiction Rehabilitation Centres (PUSPEN) nationwide to accommodate clients who need treatment and rehabilitation. From 2020 until now, PUSPEN nationwide has admitted 85 clients who are OKU. Among the centres providing treatment to OKU are those at Bukit Chabang, Kampung Selamat, Benta and several

Datuk Seri Dr. Shamsul Anuar bin NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

other places. AADK offers two methods of treatment and rehabilitation to clients through the i-Pulih AADK model, namely treatment and rehabilitation within institutions (RPDI) and also treatment and rehabilitation within the community. Rehabilitation officers will conduct an assessment to recommend whether a client should be placed for treatment and rehabilitation at a PUSPEN or in the community. The government, through AADK, has introduced a new method to ensure that our service delivery is more efficient and effective, particularly treatment and rehabilitation for the public, by also establishing mobile treatment that is always ready to provide services to various parties in need. Next, the government is also improving existing PUSPEN and studying the need to build new PUSPEN. However, the construction of PUSPEN is based on the need to strengthen addiction treatment and rehabilitation services as a whole, and we are not limited to OKU alone. Thank you, Mr Speaker.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Supplementary question, Honourable Member. Please proceed.

Thank you, Honourable Deputy Minister. Congratulations to Mr Speaker, and to Police Day today, and to the Minister too; I would like to congratulate him for winning so brilliantly. If you look at the list, just a little below Deputy President. After this, it is probably the Deputy President. [Applause] Honourable Deputy Minister, I would like to ask: how many OKU are involved with drugs across Malaysia, and by state, where, as the Honourable Minister mentioned just now, are they placed at AADK's training centres. Second, we have previously proposed that the National Service Training Centre be used for these OKU, or at district hospitals, because every district hospital has vacancies and sometimes there are empty buildings that are not used, so that parents of these children can see their children up close. As we know, these children are OKU and sometimes they have to travel far. Third question, does the ministry plan to provide training to AADK officers

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Member, Honourable Member, please shorten your question, time.

To handle these OKU drug users, because we have received information that there is a shortage of officers who can handle our OKU children who are involved with drugs. Thank you, Mr Speaker.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Deputy Minister.

Thank you, Honourable Langkawi, for the question. In total, those undergoing treatment under AADK's management, whether in treatment centres or in the community, number 70,000 people. Under AADK's management in PUSPEN treatment centres, as I mentioned earlier, there are 85 persons.

For the information of the House, we will assess OKU patients. If they truly have no capacity, they will be treated through the community. However, if OKU who are physically able, treatment will be carried out in our treatment centres at PUSPEN. That is the method. The proposals put forward by the Honourable Member just now for the use of PLKN and so on, we will study, but we do have plans to expand based on need, though no longer focused on the use of PLKN. From time to time, we do hold training and enhance

the capacity of our officers to deal with and manage treatment cases for OKU, and we do encourage NGOs and government agencies to participate, especially in treatment within our community programmes. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Supplementary question. The Honourable Pekan is invited.

Thank you, Mr Speaker. It is indeed not easy to handle OKU who are involved with drug addiction. My question is, what are the constraints and challenges faced, and the approaches implemented by AADK in rehabilitating OKU clients? How many PUSPEN locations specifically accommodate OKU, and what is their capacity? Thank you.

Thank you, Honourable Pekan. There are indeed challenges, but as I mentioned earlier, from time to time we constantly enhance our capacity by using various models and improving our services to these clients. For the Honourable Member's information, as I mentioned earlier, in PUSPEN we have about 85 of our clients who are OKU. For information, to enable us to decide where to place these OKU clients, we look first at their level of physical capacity. If their physical condition allows them to be independent, we place them in a centre; if not, we carry out community programmes. So far we have 30 PUSPEN and we have not specifically reserved any solely for OKU. That means we place them in all locations, because at all these places we have the capacity to handle such cases. There are challenges. Nevertheless, we are always open to cooperating with any party in carrying out treatment and rehabilitation. What is important is that we are among the countries that truly focus on solving the drug problem in this country. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Deputy Minister. We move to the seventh question. [Question No. 7 – YB. Datuk Seri Panglima Dr. Jeffrey G. Kitingan (Keningau) absent]

Ahmad Fadhli bin ShaariPAS · PNPasir Mas · questionEN

8. Tuan Haji Ahmad Fadhli bin Shaari [Pasir Mas] asks the Minister of Local Government Development to state: (a) the estimated number of affordable housing units needed in the state of Kelantan at this time; and (b) the estimated number of affordable housing units in the state of Kelantan currently being built by the ministry at this time.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

Thank you, Mr Speaker. For the information of the Honourable Members, under the implementation of 500,000 affordable housing units (RMM) during the Twelfth Malaysia Plan, the Kelantan State Government has targeted the provision of 1,235 RMM units to meet the needs of the local population. For the further information of the Honourable Members, the housing programmes implemented by the Ministry of Local Government Development (KPKT) in the state of Kelantan are as follows: (i) People's Housing Programme (PPR). As of 31 January 2023, there are six projects comprising 3,268 units that have been completed

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

built, while one project is under construction comprising 150 housing units; (ii) Rumah Mesra Rakyat (RMR) programme. This programme is implemented by Syarikat Perumahan Negara Berhad (SPNB) and is able to benefit the B40 group who own land or land belonging to family members with permission. As of 31 January 2023, there are 8,686 RMR units that have been completed and 343 units under construction, as well as 16 units in planning; (iii) PR1MA Housing Programme. This programme is an RMM programme for the M40 group implemented by PR1MA. As of 31 January 2023, there are 963 housing units that have been completed, 629 housing units under construction and 1,371 housing units in planning; and (iv) SPNB residences. This programme is implemented by SPNB and is an RMM programme for the M40 group. As of 31 January 2023, there are 2,699 housing units that have been completed in Kelantan. Taking into account the needs of the people and the current economic position, KPKT will continue to focus actively on access to quality and affordable housing to meet the needs of the people. That is all, thank you, Mr Speaker.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Supplementary question, Honourable Pasir Mas.

Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. I thank KPKT for its commitment to continuing the construction of these affordable housing units in Kelantan in particular. My question is, I read a report from a study by the United Nations Children's Fund (UNICEF) finding that more than 12.3 per cent of children and adolescents aged 10 to 17 years living in People's Housing Projects (PPR) in the Klang Valley experience mental health problems and are prone to suicide. Honourable Deputy Minister, I understand this issue certainly involves cross-ministry matters, the Ministry of Health, welfare and so on. However, when I read the causes, they point to overcrowding in PPR. So, from KPKT's perspective, how do we address this overcrowding issue so that it does not lead to mental health problems and also suicide that occur among children and adolescents in these PPR. Thank you, Honourable Deputy Minister.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Deputy Minister.

Thank you, Honourable Pasir Mas. Thank you, Mr Speaker. There are several steps we can take in follow-up. Because this report is not the first. For example, the Khazanah Research Institute has also issued a report that is almost similar, about the problems occurring in B40 areas or PPR. So, first, God willing, I myself want to meet them. I want to understand the results of the research that has been done so that we are not based only on newspaper reports. At least, I want to go through the details. Second, for the Honourable Member's information, in terms of the future direction of PPR, at KPKT level we have indeed set several proposals, for example, in terms of the size of the housing unit itself. That is that

our proposal that we will try to implement for this year and onwards is at least 750 square feet. Third, for example, regarding facilities and design, these must be more comfortable and not cause problems in the future. However, what the Honourable Member referred to is also a real matter. Existing PPR, especially in the Klang Valley, may already be old. If I look at that report, many of the PPR the study covers are long-established. So, while we can plan new infrastructure for the existing situation, we need to look at programmes to enhance liveability or increase the capacity of the community. This is not only about the future of children; we also look at safety and other matters. Finally, Mr Speaker, as the Honourable Member said, we involve many ministries and so on, and through KPKT, also through PLANMalaysia, we are indeed drafting the Panduan Inisiatif Perancangan Ke arah Persekitaran Mesra Kanak-kanak (Guidelines for Child-Friendly Environment Planning Initiatives). The challenge is that these are guidelines we are trying to issue, but in the end it is the implementation, and how we ensure that all these plans are taken into account, whether for future projects or programmes, as well as the actual current situation, because we cannot simply move on without looking at today's situation. That is all, thank you, Mr Speaker.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please proceed, Honourable Paya Besar.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu Langat

Hulu Langat.

Tuan Tan Hong PinDAP · PHBakri

Bakri, Bakri.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Hulu Langat rises first.

Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. I am confident that the basis of these affordable housing units is mainly related to price. I would like to ask the ministry for its view: how is the location for building these affordable housing units determined? This is because, what is happening today, those who – affordable housing is for the B40 group, the lower bracket of M40. So, when they own affordable housing far from basic amenities, it does not give a good return on rising cost of living, and it also becomes a burden. I want to ask the Honourable Member, in this city there is a lot of Federal land. Why does the ministry not use the available space as the Pahang State Government did, which is using state government land to build houses, because PR1MA Pahang is cheaper than PR1MA Malaysia. This is the second point on which I seek the Honourable Member's view. Thirdly, what about access to financing for affordable housing? Are there any efforts to enhance the Housing Credit Guarantee Scheme so that access for young people who want this housing can be made easier. Thank you, Honourable Member.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please proceed, Honourable Minister.

Thank you, Mr Speaker. Thank you, Honourable Paya Besar. This is not one question, there were four or five questions just now. So, I will try to summarise them.

In terms of affordable housing, the definition is actually rather loose, because when we speak of affordable housing, on one side is PPR itself for B40. On the other side, there is the M40 group, referred to as PR1MA housing and so on. For projects like PPR, this is a partnership with the state government. Usually, as we have set, our proposal for this year is to build PPR housing in every state. However, state governments must commit to ensuring that the land offered is suitable and is not charged as it would be at current market rates. We ask for a nominal fee, or better still, preferably free of charge, because in the end the people of that state will be the ones who benefit from the construction once it is completed. Second, regarding access in terms of finance, in terms of loan assistance. For example, the Housing Credit Guarantee Scheme (SJKP) mentioned earlier for borrowers, under the budget of this Madani Budget, we have actually increased it. Previously the allocation was usually only RM2 billion. For this year, we have indeed increased it to RM5 billion for this guarantee allocation. However, in terms of the current situation as well, regarding housing construction or projects like the one the Honourable Member mentioned earlier, the reality is that when we talk about affordable housing or houses under certain prices, the location may not be suitable and may not meet demand. Therefore, for future construction we also place emphasis on feasibility studies. It is not only about political strength. Everyone wants houses in their area if possible. Everyone wants to develop in their own area. However, we must also reflect on the actual reality of whether there is demand or whether there is a commensurate return so that progress can be completed. So, I think I have been able to answer the questions somewhat within this one minute. However, the Honourable Paya Besar's question is of a policy nature, and I think there is much room for us to discuss it later. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

We proceed to the ninth question. Datuk Wetrom bin Bahanda, the Honourable Kota Marudu.

Wetrom BahandaKDMKota Marudu · questionEN

9. Datuk Wetrom bin Bahanda [Kota Marudu] asks the Minister of Health to state regarding the shortage of health facilities at Kota Marudu Hospital, such as the availability of body freezers (freezer) for corpses, the availability of wards to accommodate patients, the shortage of ambulance vehicles, and also the shortage of trained staff such as specialist doctors. Does the ministry have plans to upgrade Kota Marudu Hospital given that it is among the focal hospitals in the North-West Coast area, Sabah State.

Tuan Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Mr Speaker. At present, Kota Marudu Hospital receives visiting specialist services in 17 fields of specialty and sub-specialty to improve access to specialist services. To meet the needs of the local population in the area, the Ministry of Health Malaysia (KKM) also has plans to upgrade Kota Marudu Hospital into a specialist hospital in phases, with a target of 10 core specialties. However, these plans require coordination in terms of infrastructure development as well as the addition of sufficient manpower and financial resources to support the specialist services needed. Accordingly, in line with needs and more holistic planning, KKM has decided to change the scope of the project previously approved under the Eleventh Malaysia Plan, Rolling Plan First (RP1), namely the upgrading of the

Tuan Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

engineering system of Kota Marudu Hospital, to the construction of an additional block for Kota Marudu Hospital. This more comprehensive new scope proposal will provide 200 additional beds, including diagnostic imaging equipment. Regarding the availability of body storage freezers (freezer) (with permission), Kota Marudu Hospital received one unit of two-tier body freezer in 2016. The body freezer is still fully functional. For the information of the Honourable Kota Marudu as well, the latest number of ambulances still fully operational in Kota Marudu is 6 units, and KKM will allocate two more Type B ambulances to Kota Marudu Hospital through new procurement, expected to be received at the end of this year. That is all, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. The supplementary question is invited from the Honourable Kota Marudu.

Datuk Wetrom bin BahandaKDMKota MaruduEN

Thank you, Mr Speaker. Honourable Minister, I would like to ask. Since there is a plan to add this new block, when might this block be planned for implementation? Because the people of Kota Marudu need urgent action from the government. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please, Honourable Minister.

Thank you for the supplementary question from the Honourable Member for Kota Marudu, who I see is very concerned about the public health needs, especially in Kota Marudu and particularly in the state of Sabah. Given that this project has been approved under the Eleventh Malaysia Plan, we will make an amendment to the project. This means that the project will be implemented and is being planned, and I also hope that this project can be carried out well by JKR (Public Works Department) Sarawak if the project is handed over to JKR. For other plans, we will ensure that Kota Marudu Hospital will become a cluster hospital and also a combination of hospitals in the surrounding area, such as Pitas Hospital, which is currently nearby, and we will hold visits by 17 specialties to meet health needs. I hope that an engagement session between the Honourable Member for Kota Marudu and the Ministry of Health Malaysia (KKM) can be held to ensure this project can be implemented well and can meet the needs of the Honourable Member for Kota Marudu and her community.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Tanjong Karang is invited to ask a supplementary question.

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong KarangEN

Thank you, Mr Speaker. Tanjong Karang extends greetings on the 216th Police Day. Thank you for the trust in safeguarding the nation's security. Regarding the extended operating hours of health clinics implemented at 52 health clinics nationwide, namely an extension from 5.00 p.m. to 9.30 p.m. from Monday to Friday, and from 8.00 a.m. to 12.30 p.m. on Saturdays. To what extent have these extended operating hours succeeded in reducing congestion at the Hospital Emergency Department? What steps have been taken by the Ministry of Health Malaysia to encourage more doctors from private clinics to join this extended operations programme? Last Friday, a fire broke out at the Pharmacy Department, Hospital Tuanku Ja'afar, Seremban, and among the complaints received were that the fire alarm system did not function and hospital staff were not trained to control fires. What is the ministry's assurance that such safety issues will not recur? Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

The Honourable Minister.

Although the question goes beyond the scope asked, I will try to answer. For the second question, KKM has prepared a media statement regarding the fire incident at the Pharmacy Unit and also the steps to be taken to ensure this incident does not recur. Also, safety measures and advice from security agencies will be taken so that this incident will not happen again in the future.

Regarding extended hours at the 52 KKM premises, all statements by the Honourable Minister have been issued, as well as infographics listing the 52 clinics that will operate the extended hours. Nevertheless, I would like to add one scope, where a special committee chaired by the Chief Secretary to the Government (KSN) under STAR is currently conducting, and will conduct, a pilot programme, with permission, on clinic congestion, starting at Klinik Botanik, and this study will run for three months. We will obtain proposals and views from KSN and his secretariat on how we can improve and also all clinics that will operate these extended hours. We will issue a guideline, and we do not want to burden our healthcare workers, our workforce, with excessive workloads. We also hope that with these extended hours, we can at least reduce congestion in the hospital's green zone in the emergency department. As for the involvement of GPs, we do request it, and the statement by the Honourable Minister has also been released in the press that KKM and the Honourable Minister and myself appeal for voluntary assistance, and for the payment process and how we finance this programme, we can come to KKM to discuss.

Deputy Speaker (Dato’ Ramli bin Dato' Mohd Nor)EN

We now move to question number 10. Dr. Haji Abd Ghani bin Ahmad, the Honourable Member for Jerlun, is invited.

Abdul Ghani bin AhmadPAS · PNJerlun · questionEN

10. Dr. Haji Abd Ghani bin Ahmad [Jerlun] asked the Minister of Rural and Regional Development to state the policy on the installation of public street lights (village street lights/mini tar) and how long the period is from approval of an application until installation is carried out.

Datuk Hajah Rubiah binti Haji WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

Thank you, Mr Speaker, thank you to the Honourable Member for Jerlun for the question regarding village street lights. For the information of Honourable Members, in the implementation of village road projects, this ministry involves the installation of up to 40 one-off units of lights for a village on the existing grid line, with focus given to the front of public buildings such as surau, mosques, places of worship, schools, village halls, and road junctions entering the road. To ensure the appropriate quantity of village street lights (LJK) installed for each village, the state development office is responsible for coordinating and identifying the needs and proposed locations for LJK installation in villages. For the information of the Honourable Member, villages eligible for consideration for street light installation are: (i) all villages outside and on the fringes of towns that receive electricity supply through grid line connection; and (ii) village settlement areas under FELDA schemes, but the implementation and financing of installation costs

Datuk Hajah Rubiah binti Haji WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

and maintenance are assigned by the government to FELDA. Meanwhile, villages that are not eligible to apply for this programme are: (i) villages that have not yet received electricity supply through grid line connection; (ii) villages within the operating area of local authorities (PBT); and (iii) housing estate areas or relocation settlements developed by the private sector. However, for villages supplied with electricity through solar systems, especially in Sabah and Sarawak, village street lights in front of public buildings in the village concerned are included under that system. For the information of the Honourable Member as well, the approval period for applications is between 12 months and 24 months, subject to the procurement process, on-site checks, and the contract period. Thank you, Mr Speaker.

Deputy Speaker (Dato’ Ramli bin Dato' Mohd Nor)EN

Supplementary question, Honourable Member for Jerlun.

Mr Speaker, I am interested in the installation of lights using solar lamps that are specifically for Sabah and Sarawak. My supplementary question is, does the government also plan to use solar lamps that can be described as reducing maintenance and cost? Second, does that readiness also provide opportunities for other subsidiary companies or companies permitted apart from TNB that can carry out improvements or improve efficiency in terms of maintenance? That is all.

Deputy Speaker (Dato’ Ramli bin Dato' Mohd Nor)EN

The Honourable Minister.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Thank you, Honourable Member for Jerlun. Regarding the first question just now, on the method of installing street lights using the solar method. For the information of the Honourable Member, most installations of solar street lights are largely implemented in Sabah and also in Sarawak. However, in the Peninsular Malaysia area, we focus on areas that have supply based on grid line connection since this facility is already available. Second, regarding ...

Mr Speaker, the Minister has not answered yet. Does the ministry plan to also install solar lights in the Peninsula? That is my question.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Okay. For the information of the Honourable Member, the ministry is studying whether this method is suitable or can be implemented in areas that have grid lines. This means we are still in the process of considering the method of implementing solar in areas with grid lines. Second, from the perspective of LED light installation, the ministry is now also focusing the installation of street lights on LED because its cost is cheaper, its maintenance is also cheaper, and in terms of brightness it is also higher. In the past we often used the method known as HPSV lights, which were yellow. LED is white, but now we are indeed focusing on the use of street lights that use LED technology. The third question just now was related to what, ya?

Other companies apart from TNB.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Okay. For the information of the Honourable Member, companies implementing this street light installation programme are subject to the procurement method that we implement together with MOF. Usually we will give priority to companies registered with TNB and companies in Sarawak, SEB, and likewise in Sabah, which are companies managing electricity in the states concerned. The purpose is to facilitate not only installation but also maintenance of the street lights concerned. That is all, thank you.

Tuan Fong Kui LunDAP · PHBukit Bintang

[Bangun]

[Bangun]

Deputy Speaker (Dato’ Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Bukit Bintang.

Tuan Fong Kui LunDAP · PHBukit Bintang

Terima kasih.

Where are there street lights in the city, Mr Speaker?

Tuan Fong Kui LunDAP · PHBukit BintangEN

Mr Speaker, supplementary question.

Deputy Speaker (Dato’ Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Bukit Bintang, who stood up earlier.

Tuan Fong Kui LunDAP · PHBukit BintangEN

I would like to ask the Honourable Deputy Minister, will the ministry consider that solar LED, being a new technology, can be used in rural areas? Will the ministry consider using solar LED throughout the country in the future? Thank you.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Thank you, Honourable Member for Bukit Bintang. As I answered earlier to the Honourable Member for Jerlun, our ministry has indeed taken an approach to look at this solar method, the installation of solar-method street lights, so that it can be implemented throughout the country, given that it is not only in terms of payment cost but also in terms of maintenance. Indeed, we are planning, in the ministry's proposals, to ensure or use this solar method for street lights throughout the country. Thank you, Mr Speaker.

May I ask a little, Mr Speaker, just a little.

Deputy Speaker (Dato’ Ramli bin Dato' Mohd Nor)EN

Honourable Member, that is enough, Honourable Member. We move on to the next question.

[Laughter.] We are friends, Mr Speaker.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. The Chair invites the Honourable Member for Putatan, Datuk Ir. Shahelmey bin Yahya. Not in the House? First call, second call, third call. We move on to question number 12, the Honourable Member for Kemaman, Tuan Che Alias bin Hamid.

[Question No. 11 – Honourable Member for Putatan, Datuk Ir. Shahelmey bin Yahya, absent]

Che Alias bin HamidPAS · PNKemaman · questionEN

12. Tuan Che Alias bin Hamid [Kemaman] asked the Minister of Natural Resources, Environment and Climate Change to state: (a) the list of hotspot areas where early warning systems for flood disasters have been installed nationwide up to 2022; and (b) the extent to which the use of Industrial Revolution 4.0 (IR 4.0) technology can reduce the risk of flood disasters in the future.

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources, Environment and Climate Change · SetiawangsaEN

Thank you, Honourable Member for Kemaman. The ministry, through JPS (Department of Irrigation and Drainage), has the role of making flood forecasts and warnings for the whole country through the National Flood Forecasting and Warning Programme (PRAB). PRAB is an early flood forecasting programme implemented with, with permission, the National Flood Forecasting and Warning System, which we call NaFFWS, which performs real-time detection of rainfall and water levels. At present, the target accuracy is generally one metre, and a target of 0.5 metre will be improved but also depends on the conditions of the river basin. This programme is capable of forecasting seven days of flood simulation and issuing early warning announcements as early as two days in advance. As planned, this flood forecasting programme will be carried out comprehensively for the whole country and involves 41 river basins. The development of this programme is divided into phase one and phase two, beginning in 2015 and ending in 2025. PRAB phase one involves three main river basins, namely Kelantan, Terengganu and Pahang, which began operating in 2017. The development of PRAB phase two involves 38 river basins and is expected to be completed in stages and will be fully operational nationwide by 2025. JPS is also in the phased construction of 526 flood warning siren stations across the country. These flood warning siren stations are placed at flood hotspot locations nationwide as an early warning system where flood warnings will be issued to residents of affected areas. The following is the list of the number of siren stations by state. Perlis 12, Kedah 38, Penang 27, Perak 28, Selangor 99, Kuala Lumpur 24, Negeri Sembilan 21, Melaka 13, Johor 45, Labuan one, Kelantan 28, Terengganu 10, Pahang 40, Sarawak 23 and Sabah 117. JPS under the PRAB initiative has also implemented the National Flood Forecasting and Warning Information Management System Project, named the Integrated Forecasting Operations System. This system consists of 14 main modules designed to support PRAB with the main objective of managing, processing and validating hydrological station data. This system adopts Industrial Revolution 4.0 (IR4.0) technology with the use of the Internet of Things, namely detection equipment at telemetric hydrological stations, and the use of big data and crowd outsourcing to identify and provide comprehensive dissemination of forecasts and warnings of locations in flood areas. The main module of this system is the Public Infobanjir portal used by the public. The ministry also – just a little – through NAHRIM has developed a hydro-climate projection information system and portal starting from 2016 by applying Industrial Revolution 4.0 technology. Hydro-climate projection data up to the year 2100, especially rainfall distribution data, will be used and is capable of assisting planning and early preparedness to reduce flood risk, such as anticipating future extreme rainfall episodes. As an example, this hydro-climate projection model has been able to detect projected fairly heavy rainfall episodes in the northern part of the country, including Gunung Jerai in August 2021, and the extraordinary floods that struck Peninsular Malaysia in the Klang Valley and East Coast in December 2021, including the flash flood that occurred on 4 July 2022 at Kampung Iboi Kupang, Kedah.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Member for Kemaman, supplementary question.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Thank you, Honourable Minister, for the answer given. Sponge city refers to urban areas with many natural features such as trees, lakes and various other designs for the purpose of absorbing rain and absorbing floods. My question is, to what extent has research and study been carried out to create sponge cities following flash floods or stagnant flooding, especially in urban areas, as a result of the climate change occurring today. Can the Honourable Minister explain the latest status of the development of flood mitigation projects, including river basin projects on the East Coast, especially in Terengganu. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Honourable Member. The concept of sponge city is a concept that is very popular today. Indeed, we see that when conventional development takes place where many areas are concreted and there are problems with water being drained properly or absorbed, then flood problems, especially the flash floods we are experiencing, will occur. So, at the level of the authorities, we are indeed looking at future urban planning where as much as possible we want to preserve natural attributes, with permission, natural values, and reduce the sealing or construction of hard landscaping that we have seen before, which will affect water absorption. However, because many of the buildings we inherited previously are conventional in nature. Second, regarding details of flood mitigation projects in river basins in the state of Terengganu, I will explain those in writing. However, Insya-Allah, in general my answer is as previously informed, we will start these projects in June, in that urgent list, as quickly as possible.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Please, the Honourable Member for Petaling Jaya.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you, Mr Speaker. We are well aware that many siren systems have already been installed. However, sometimes because of the rather strange sound for local residents, they cannot know the warning earlier. My question is whether the SMS GOV system can also be used to complement the warning system, because with current technology, I think SMS can be sent more targeted to groups or communities of victims who are likely to be affected by the flood. Thank you.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Congratulations. The Chair invites you to continue.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Honourable Member for Petaling Jaya. Firstly, regarding the SMS matter, we can consider it. However, we also have to note, I think many, especially the young, rarely open it unless they need to enter a bank account and so on; they rarely open SMS. However, we will see whether there are the best methods, including WhatsApp and so on that we can use. Secondly, what is also being studied at the level of the authorities – there are and have begun to be made – these sirens do not only sound a siren but there is a voice advising residents to leave. Perhaps if they hear the siren they think something else is happening, but we want to put in a voice that may be more effective.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thirdly, I think this is the responsibility of the authorities: perhaps we need more publicity, not only in the mass media such as TV but also through YouTube and so on, to educate the public that this is the warning system we have and that they must comply with this system when they hear it.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Mr Speaker, flood-prone areas.

Deputy Speaker (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Minister. The Honourable Member for Damansara, Tuan Gobind Singh Deo, is invited to speak.

Gobind Singh DeoDAP · PHDamansara · questionEN

13. Tuan Gobind Singh Deo [Damansara] asks the Minister of Local Government Development to state whether the ministry intends to issue guidelines for premises that carry out camping activities on hill slopes so that a tragedy like the Batang Kali tragedy can be avoided in the future.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

Thank you, Mr Speaker, and thank you to the Honourable Member for Damasara. For the information of the Honourable Member, following the landslide incident in Batang Kali, the Ministry of Local Government Development (KPKT), through the Department of Town and Country Planning (PLANMalaysia), has prepared a draft Planning Guideline (GPP) for camping sites. This draft GPP is expected to be finalised by the end of April 2023 after taking into account the views and feedback of various relevant agencies, local authorities and also industry players, namely camping site operators.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

This GPP focuses on basic-type camping activities, also known as primitive camping or backcountry camping, with permission, namely camping that uses tents erected in natural areas with minimal basic facilities, together with equipment and food that participants must bring themselves. [Mr Speaker presided over the Sitting] The important aspects relating to planning and control of the suitability of camping sites that have been outlined are as follows: (i) the suitability of proposed locations of camping sites permitted in mountainous and hilly areas, along seashores and riverbanks, forest areas, areas at risk of natural disasters, and other environmentally sensitive areas (KSAS); (ii) site safety by determining an appropriate distance from prohibited and environmentally sensitive areas, suitable topographic conditions and slope levels, and soil strength structure; (iii) the need for and suitability of access routes in and out of the camping site; (iv) the need for basic facilities and infrastructure such as drainage systems, water supply, electricity, sewerage, solid waste management, parking facilities, management offices, assembly points, first aid points, toilets, cooking areas, surau and so on; and

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Local Government Development · Johor BahruEN

(v) management and operation of the camping site, covering safety briefing check-in, staffing needs of operators and emergency management. The draft GPP also touches on aspects relating to legal compliance under the jurisdiction of the local authority (PBT) and related agencies, such as approval of temporary building permits, business licences, signboard and advertisement permits, and permits to carry out outdoor or extreme activities such as flying fox and others. It is hoped that with the guidelines to be provided, aspects relating to safety, comfort and conservation of the natural environment can be given attention in the planning and development of camping sites so that the Batang Kali tragedy can be avoided in the future. That is all, thank you, Mr Speaker.

Mr SpeakerEN

The Honourable Member for Damansara.

Tuan Gobind Singh DeoDAP · PHDamansaraEN

Thank you, Mr Speaker, and thank you to the Honourable Deputy Minister. Honourable Deputy Minister, we all want to avoid a tragedy like the one we saw happen again or recur. I also accept what has been said, that there is indeed a proposal by the government to establish guidelines to ensure that incidents of this kind do not happen again in the future. However, the Honourable Deputy Minister is also aware that at present there are still many businesses carrying out camping activities on hill slopes and so on. The guidelines just mentioned are guidelines that will be established for the future. My question concerns companies that already exist and are still carrying out these activities now: what is the government's proposal to ensure that they also follow the existing guidelines proposed by the ministry in the future? Thank you, Mr Speaker.

Mr SpeakerEN

Honourable Deputy Minister, please.

Thank you, Mr Speaker, and thank you to the Honourable Member for Damansara. It is clear that the Honourable Member is sincere and has examined this carefully. As I said earlier, when we make these guidelines, we have three frameworks. First, we want to standardise governance and the legal process relating to approval of camping site development. So that this matter is standardised. For that reason, engagement sessions have been held. Second, the planning of camping sites, such as the location of camping development sites, must have basic facilities and utilities that must be provided. And third, this is basically a guide for us in the management and operation of camping sites. The Honourable Member's reference just now was more in depth, namely that the fact is that operators or industry players already exist. So, while we have guidelines, how do we ensure that this matter is followed and implemented below. This is why the people asked for this: not only guidelines, but implementation on the ground. So, for the information or views of the Honourable Member just now, we indeed need a regularisation process, namely ensuring that those who have been carrying out these activities, that is at existing camping sites, can meet these requirements. So, for the information of the House, for example, now that we have a process and so on, the Selangor State Government has actually also begun a regularisation process for these sites since - and as we went through until 31 March 2023, it identified them. This regularisation process is to ensure that they have been operating before 15 March 2023. So, for those that have been operating up to now, we need to consider them, namely they must register with the local authority to obtain a temporary building permit (PBS) so that they can continue their operations at this time. However, we need to give a period, namely in the case of Selangor, we give a period of two years for them to meet the conditions that we

will present later, these guidelines just mentioned, so that there is room for existing operators to meet the conditions imposed. So, for that reason, I thank the state government that took the initiative, and indeed we will engage with the other state governments so that when we have guidelines prepared later, not merely as proposals, there must also be implementation by the local authorities, including the operators. Thank you, Mr Speaker, and thank you to the Honourable Member for Damansara.

Tuan Sabri bin AzitPAS · PNJerai

Jerai.

Mr SpeakerEN

Alright, thank you, Honourable Deputy Minister. Time is up. The session for Questions for Oral Answer today has now ended. I invite the Honourable Minister. [Time for Questions for Oral Answer ended]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Datuk Ugak anak KumbongPRS · GPSDeputy Minister in the Prime Minister's Department (Sabah, Sarawak and Special Duties) · Hulu RajangEN

Thank you, Mr Speaker. "Pursuant to Standing Order 12(1), I beg to propose that today's Sitting shall not be adjourned until the debate and decision at the Committee stage on the Ministry of Entrepreneur and Cooperative Development, the Ministry of Works and the Ministry of Foreign Affairs for the Supply Bill 2023 and the Motion on Development Expenditure Estimates 2023 are completed, and after that the House shall adjourn until 10 a.m. on Tuesday, 21 March 2023."

Mr SpeakerEN

Is there anyone who seconds?

Tuan Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Mr Speaker, I beg to second.

Mr SpeakerEN

Thank you. Honourable Members, I now put the question to the House for decision. The question is that the motion as moved be agreed to.

[Motion put for decision; and agreed to]

Bill — Supply Bill 2023 and Development Estimates Motion 2023 CommitteeBill

The Order Paper was read to resume consideration of the "Supply Bill 2023 and the Motion on Development Expenditure Estimates 2023 in the Committee of the whole House." [Fifth Day] [The House resolved itself into Committee] [Mr Speaker presided over the Committee]

Mr ChairmanEN

Alright, Honourable Members, now it is the turn of the Ministry of Entrepreneur and Cooperative Development. I have received many names. However, since we have made a decision to adjourn early and not extend the sitting into the night, we will only allow 17 debaters to speak today. I will read out all their names. First, the Honourable Member for Ipoh Timur, the Honourable Member for Sungai Besar, the Honourable Member for Parit Sulong, the Honourable Member for Padang Besar, the Honourable Member for Sungai Siput, the Honourable Member for Rompin, the Honourable Member for Betong, the Honourable Member for Bagan Serai, the Honourable Member for Muar, the Honourable Member for Langkawi, the Honourable Member for Rasah, the Honourable Member for Jerlun, the Honourable Member for Libaran, the Honourable Member for Bukit Gantang, the Honourable Member for Ampang, the Honourable Member for Dungun and the Honourable Member for Batang Lupar. Each debater will be given five minutes, and we begin by inviting the Honourable Member for Ipoh Timur. Please proceed.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Mr Speaker. I would like to take –Oh, Tuan Pengerusi. Sorry, I apologise. Thank you, and good morning to Tuan Pengerusi and Honourable Members...

Mr ChairmanEN

Before that, the Honourable Member for Ipoh Timur...

Tuan Lee Chuan HowDAP · PHIpoh Timor

Ya, saya.

Mr ChairmanEN

I missed one sentence here.

Tuan Lee Chuan HowDAP · PHIpoh Timor

Okey.

Bill — Supply Bill 2023 and Development Estimates Motion 2023 Committee — Head B.26 [Schedule] – Head P.26 [Development Estimates 2023] –Bill

Mr ChairmanEN

The ministry we will discuss is the Ministry of Entrepreneur and Cooperative Development. Supply Head B.26 and Development Head P.26 under the Ministry of Entrepreneur and Cooperative Development are open for debate. Accordingly, I invite the Honourable Member for Ipoh Timur. Please proceed.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Tuan Pengerusi. We both made a mistake, and we both correct it. [Laughter].

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

I would like to refer to P.26 and under it Item 00601 – Dana Pembangunan dan Pembiayaan PKS (SME Development and Financing Fund), RM55 million. Item 00603 – Entrepreneurship Programme, RM10 million, Item 10300 – SME Bank, where there is RM4 million, Item 96000 – National Entrepreneurship Institute (INSKEN), there is RM10 million. We understand that there is a lot of money there, and if we look at P.26 as a whole, if we compare the projection and also what was approved for the Budget 2022, RM355 million. This year, we propose a sharp increase of RM65 million, bringing it up to RM520 million. Congratulations and well done on this very meaningful proposal to develop our cooperatives and our outstanding entrepreneurs in Malaysia. However, I am rather concerned and worried that in the overall proposal, whether in the Items or in the speech text of the Honourable Prime Minister and also the Minister of Finance, social entrepreneurship or social enterprises is not mentioned at all, and there is no allocation that can be seen going forward for it, with permission. We know that there is already a blueprint for it, which was mentioned by the Honourable Minister himself earlier, that there is an extremely urgent need for us to unite one Malaysia, one nation and one society to solve together the problems that exist in our society. Let me give an example: this RM65 million increase should have been given to entrepreneurs out there, who have expertise and want to invest capex, with permission, to establish mobile care units to deliver wound care to patients' homes as well. Is that matter or allocation available at the Ministry of Health level? No. We know it is not, because it has already increased, but there are more urgent things. However, we can mobilise the expertise that exists out there and the willingness and resolve to deliver such services. However, this requires some investment by KUSKOP, if any. With the help of INSKEN, SME Corp, SME Bank, to deliver assistance that can be described as capital expenditure, to purchase or obtain mobile care units, with permission, in the field. There is also the problem that we have 700,000 students in 10 years who have dropped out of SPM. There are 175,000 of our students, our children, our Malaysian children who are poor in learning, and we also know that there are 286,000 pre-school students who have dropped out. As much as 58 per cent of Orang Asli students, most of them dropped out or are poor in learning because these children enter straight into Standard One, Year One, they are expected to already know how, already be proficient in learning, because the curriculum at this point for Year One really requires them to already be proficient in learning and proficient in reading. However, if they are not proficient in learning, they will drop out. There is expertise out there. Former teachers, people who have PhDs, master's degrees in grassroots education, who can be helped to establish social enterprises out there to deliver assistance and education to these dropped-out students. Where are the capital expenditure grants, outright grants, or matching grants, or social enterprise grants to empower these groups, to mobilise them together to solve the problems of our society and our nation? In this madani society or madani nation, we need a whole-of-society and whole-of-nation approach, and I ask the Minister of KUSKOP, together with the Minister of Finance, to ensure at least through virement, to shift from Item 00601, Item 00603, Item 10300, to create a special outright grant aid for the purpose of empowerment, mobilisation and delivery of services that are urgently needed by the people through social enterprises. That is all, thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Sungai Besar.

Datuk Muslimin bin YahayaBERSATU · PNSungai BesarEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi taala wabarakatuh. Greetings of peace, good morning. Thank you, Tuan Pengerusi. Tuan Pengerusi, I will go straight to P.26, Item 30000 – Tabung Ekonomi Kumpulan Usaha Niaga (TEKUN), which receives an allocation of RM330 million for 2023. Tuan Pengerusi, this is the only government-funded financing agency that entrepreneurs can easily contact. It has operating offices in almost every district. Under the TEKUN fund, entrepreneurs who are just beginning to breathe again after being hit by the COVID-19 pandemic, or who are nearly bankrupt, entrepreneurs who are just starting a business, and entrepreneurs who want to expand their business networks will obtain financing. So, this existing fund, can it also be applied for by more than a million informal entrepreneurs? These entrepreneurs who do not have SSM registration. Apart from the 900,000 registered micro-entrepreneurs, has the application method for their financing been made easier? Is there still a moratorium for them? Without SSM, can they still apply as before, and this time does the agency require CTOS and CCRIS as part of the application requirements? Item 96000 – National Entrepreneurship Institute (INSKEN), which only received an allocation of RM10 million. Tuan Pengerusi, this institution trains, guides, provides knowledge and consultation to entrepreneurs. To succeed as an entrepreneur, one needs knowledge, even if just by attending a cash management course. So, with an allocation of only RM10 million, how will INSKEN train nearly 2 million entrepreneurs across the country? Whereas, a previous government policy provided a solution: any entrepreneur who applies for financing from any financing institution under KUSKOP must have at least a training certificate from INSKEN. So, I would like to propose that the allocation for Item 96000 be increased so that it can provide knowledge benefits to all entrepreneurs out there. I refer to Item 030200 – Malaysian Cooperative Commission (SKM). We know Malaysian cooperatives turned 100 years old in 2022. Over that period, cooperatives have succeeded in developing assets of more than RM150 billion. There are more than 7.1 million members and more than 14,000 cooperatives have been established over these 100 years. My question is, how seriously is SKM developing cooperative shops under the CoopMart brand to boost the economy and achieve the socio-economic objectives of the nation, and what form of assistance does SKM provide to them? What efforts has SKM made to revive cooperatives that have been affected by the sectors that stopped operating due to the COVID-19 pandemic? I would also like to ask, how many cooperative products using the CoopMart brand since 2022 are on the local market? Where are cooperative products marketed apart from in cooperative shops? Previously, has SKM made efforts to bring these cooperative products onto the international market or at least to ASEAN countries? I would like to ask, what is the ministry's strategy to help SKM market more cooperative products to help SKM market in ASEAN countries in particular? What type of allocation or fund under cooperatives can encourage cooperatives to produce competitive products, trusted by the Malaysian people, or at least supply more than seven million cooperative members across the country? Tuan Pengerusi, I would like to refer to Item 030300 – Institut Koperasi Malaysia (IKMa). We know IKMa has been upgraded to a university, the Universiti Keusahawanan

Datuk Muslimin bin YahayaBERSATU · PNSungai BesarEN

Koperasi Malaysia (UKKM), which was supposed to start operations in September 2022. My question is, has UKKM received full approval from the Malaysian Qualifications Agency (MQA)? Does it involve the merger of the nation's best cooperatives? What is the purpose of establishing this university? How many programmes are offered to the public and up to what level? We propose that large-scale marketing and promotion be carried out, not only because of the establishment of this university, but also the success of establishing an entrepreneurship university in commemoration of 100 years of cooperatives in Malaysia. Thank you, Tuan Pengerusi.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Parit Sulong.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman.

Mr Chairman

Tahniah.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman. I now move to Head P.26, Item 19534 – Halal Industry and Vendor Development. My question to the ministry is what the ministry's plans are for regulating halal products in the market, and at the same time preventing misuse that may mislead the public. My second question is what mechanism the ministry has planned to increase the participation of rural entrepreneurs in the halal market. Next, how far does the ministry's role extend to providing awareness and knowledge about halal products? Since the launch of the Vendor Development Programme 2016, I would like to know what is the latest number of halal industry vendor companies, and how many of these companies have been affected due to the pandemic? Has the government identified the form of assistance provided, whether in terms of financing or training, to the companies concerned? Next, Item 90000 – Graduate Training Scheme. I would like to know what— because we know this training programme for graduates is a programme that helps graduates. So the question I need an answer to from the ministry is how far this scheme emphasises the importance of digitalisation in the career development of graduates, which we know are difficult to get employment. Apart from the Career Training Placement Programme and TVET Entrepreneurship, Basic Entrepreneurship Training and the Career Expedition Programme, what other initiatives has the ministry implemented to help graduates improve their economic standing? Next, what is the ministry's assurance that it will continue to help entrepreneurs, especially graduate entrepreneurs, in ensuring the continuity of their businesses in facing the economic crisis expected to occur this year. RM10 million has been allocated under SME Corp for the Bumiputera Young Entrepreneurs Seedling Programme (TUBE), which is expected to benefit 250 young entrepreneurs. So my question is what the ministry's plans are to incorporate such programmes into every IPTA and campus for early exposure to undergraduates, and how many people have been trained through this Graduate Training Scheme? Please state the details of the Graduate Training Scheme programme implemented under the ministry. As for Item 00601 – SME Development and Financing Fund. The SME Emergency Fund 2.0 was introduced to help SMEs severely affected by natural disasters, and recently we were informed about the country being hit by floods. Therefore my question is, how much funding has been applied for and approved for the SMEs concerned?

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Does the ministry have any proposals to implement women entrepreneur development programmes to increase the number of qualified entrepreneurs by channelling incentives to these women entrepreneurs? Next, my question is what mechanism the ministry, through Bank Rakyat, has to facilitate financing schemes for women SMEs in ensuring the continuity of their businesses. What are the ministry's plans in an effort to double the existing number of disabled (OKU) entrepreneurs to a larger number by next year? Next, regarding Item 00607 – SME Master Plan. My question to the ministry is what the strategy of the ministry is to develop more competitive SMEs in the future on a global platform. What are the ministry's plans in building SME capacity to apply the principles of environmental, social and governance, or ESG, to meet global market demand? So far, can the ministry explain the extent to which the six high-impact programmes and 26 support initiatives are aimed at turning SMEs into a successful game changer, bringing change to SMEs so they can compete at the international level? Thank you very much, Mr Chairman.

Mr ChairmanEN

Thank you, the Honourable Member for Parit Sulong. I invite the Honourable Member for Padang Besar.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Peace be upon you and the mercy of God and His blessings. Ramadan is now the talk of the town, We in Perlis focus on a welfare state, From us, proposals and questions are ready, To KUSKOP we voice them. Insya-Allah. Thank you to Mr Chairman who gave me the opportunity to debate at the Committee stage, on Head B.26 of the Ministry of Entrepreneur and Cooperative Development (KUSKOP), and Happy 216th Police Day. Firstly, regarding Item 020000 – Entrepreneur Development. For the sub-item of Item 40000, there is an increase of almost RM6 million for that sub-item. I propose that focusing on high-impact programmes, which does not mean negating basic programmes or entrepreneur formation, should be improved by focusing on the self-reliance of a family from B40 to M40. Nurturing a faithful (mukmin) entrepreneur to carry out this business jihad is better than producing more capitalist entrepreneurs. Wealth that is shared in the form of zakat, tax, sedekah and wakaf, it is proposed that a more sustainable and competitive apprenticeship programme also be established to face the challenges of the future. Integrate entrepreneur development programmes with the values of halal and haram. This will form identity and become the principle of a faithful entrepreneur. The best example is when a borrower among faithful entrepreneurs will strive to repay the loan on the basis of their responsibility. They understand the hadith, "All sins of one who dies a martyr are forgiven except debt." Narrated by Muslim. Secondly, regarding Item 020200 – Entrepreneurship Ecosystem Development. I welcome the addition to this allocation from RM2.1 million to RM2.4 million. However, it is rather odd that there is an increase under Item 10000 – Emoluments but a reduction to the allocation for Item 20000 – Services and Supplies. In a situation where government agencies are struggling to provide the best services to the people,

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

this allocation is reduced. We are well aware that developing the entrepreneurship ecosystem is very important in driving the economy both macro and micro. It is very appropriate for the ministry to examine the importance of the ecosystem it wishes to develop. Focus also on support for specific groups that are not exclusive. For example, the development of entrepreneur plazas that I have raised before for every Parliament to stimulate the gig economy. Lastly, I also propose that the allocation that will be approved be of shared use between ministries and be based on core matters. Malaysia still lags behind the group of young entrepreneurs with high income. This is the time to cultivate entrepreneurial traits from an early age. Perhaps the ministry can establish an entrepreneurship literacy model or entrepreneur partners in schools. For example, as before in the 1990s, we could see in Southern Thailand, there was a school of commerce, with permission, or technical school there, showing that from an early stage they were nurtured in that direction. I conclude with wabillahi taufiq walhidayah. Peace be upon you and the mercy of God and His blessings.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Sungai Siput.

Tuan Kesavan a/l SubramaniamPKR · PHSungai SiputEN

Thank you, Mr Chairman, for allowing Sungai Siput to also take part in the debate at the Committee stage for the Ministry of Entrepreneur and Development and Cooperatives. I see that the overall budget has increased for 2023, where there is an increase of RM165 million compared to 2022, where it went from RM355 million to RM520 million in 2023. Mr Chairman, I refer to Item 00601 – SME Development and Financing Fund with RM55 million, Item 00603 – Entrepreneurship Programme with RM10 million, Item 00606 – Micro Enterprise Development with RM5 million, Item 00607 – SME Master Plan with RM9 million and Item 00608 – SME Development Monitoring and Evaluation with RM1 million.

Tuan Kesavan a/l SubramaniamPKR · PHSungai SiputEN

I would like to ask several questions to the Ministry of Entrepreneur and Cooperative Development. Firstly, what specific policies and strategies have been formulated by the ministry to ensure that the percentage of total income of the B40 group below the poverty line has been reduced? Secondly, entrepreneurs cover a variety of sectors and businesses. What are the five traditional business types and modern e-Business, with permission, that are given priority and opportunities? Thirdly, what forms of face-to-face advisory and guidance can be provided by the ministry and agencies to entrepreneurs in towns, villages and rural areas who wish to venture into micro-entrepreneurship? Fourthly, how does the ministry monitor the effectiveness of post-training, with permission, and the success of entrepreneurs after completing the course? What indicators are used to ensure the ministry's programmes have achieved their objectives? Mr Chairman, next I refer to P.26, Item 96000 – National Entrepreneurship Institute (INSKEN), which is allocated RM10 million. The National Entrepreneurship Institute is an agency that offers training and guidance courses. The question is, it is more concentrated in the Kuala Lumpur and Klang Valley areas, where young rural entrepreneurs are rather left behind in joining these courses. I seek clarification and also, what steps has the ministry taken to help young rural entrepreneurs take part in the courses offered? For example, business on Facebook, bakery courses which young rural entrepreneurs are very interested in. So, I seek an explanation from the Ministry of Entrepreneur and Cooperative Development. Thank you.

Mr ChairmanEN

Alright. I invite the Honourable Member for Rompin.

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Peace be upon you and the mercy of God and His blessings. Thank you, Mr Chairman. Firstly, I would also like to extend Happy Police Day greetings to all police personnel, especially the police in Rompin. I refer to Item 30000, expanding TEKUN financing. Financial factors have a significant relationship with the performance of contracting firms. Therefore, Tabung Ekonomi Kumpulan Usaha Niaga (TEKUN Nasional) has also raised the maximum loan amount, especially for G1 contractors from RM100,000 to RM200,000. This loan amount should also be extended to G2 to G4 contractors, taking into account the current increase in construction costs and contractors facing cash flow issues following construction suppliers imposing cash payments for goods purchased. According to several studies that have been conducted, the rise in prices of basic construction materials has led to an increase in construction costs reaching seven per cent, thereby reducing the profit margins of contractors, especially small contractors, to between only 15 and 25 per cent. In such circumstances, how can small contractors, especially Malay contractors, survive when G1, G2, G3 and G4 licence holders depend on small and medium-scale projects? The increase in the price of construction materials also has a bad effect on players in this industry, thereby affecting planned development projects. It is estimated that 30 per cent of the approximately 132,000 contractors in this country have closed down or are unable to survive and continue business operations since 2018. About 49,606 contractors have ended their services and did not renew their SPPK and CIDB certificates. That figure has increased every year, especially during the COVID-19 pandemic, when 10,162 certificates were recorded in 2020, followed by 17,527 in 2021 and 10,096 up to April 2022. Therefore, I urge the government to consider extending TEKUN Nasional financing to G1, G2 to G4 contractors with a value not exceeding RM500,000. Next, to increase financing for riders. Since the Movement Control Order (MCO) was enforced in Malaysia beginning 18 March 2020, online food delivery services have become extremely important, and demand for the services of food delivery riders has increased significantly. The rider service is in fact not limited to food only, but also includes related services. For example, buying and delivering daily necessities, becoming a personal shopper and others. Most riders use motorcycles because of cost savings, minimal petrol costs, and also because of easier and faster movement to reach a customer's destination. TEKUN Nasional has opened opportunities for those who have lost their livelihoods, including young people, to become riders for food, goods and daily necessities delivery companies through the TEKUN Mobileprenuer 4.0 programme, which was launched in 2021. The financing amount provided is between RM1,000 and RM10,000 depending on the purpose of the application, such as purchasing motorcycles, motorcycle repairs and revolving capital, with a financing repayment period of one to three years. To help these riders, it is appropriate for the government to consider financing exceeding RM10,000 in line with the increase in the cost of living faced by some of the community in the country at this time. Next, I refer to Item 00603, digital entrepreneurship courses for youth. The International Telecommunication Union of the United Nations has placed Malaysia as the country with the highest number of digital citizens in the world. Meanwhile, the United Nations' definition of digital citizens is

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

young people aged between 15 and 24 years who actively use the internet for at least five years. Changes in living norms following the COVID-19 pandemic saw a shift towards digitalisation and also automation. The rapid development of this technology encourages young people to engage in running businesses online. Therefore, I humbly propose that digital entrepreneurship courses for youth, whether virtual or physical, need to be intensified to provide motivation, provide skills and help young traders to market their products. Thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Betong.

Greetings of peace and Happy Police Day today. Thank you, Mr Chairman, for giving me once again the opportunity to debate the budget at the Committee stage under Head B.26 and P.26, namely the Ministry of Entrepreneur Development and Cooperatives. I now move to Item 19530 – SME Enhancement and Development Programme. I see a very large increase this year, namely RM35 million compared with only RM5 million in 2022. I ask the Honourable Minister to detail what types of programmes are proposed under this item. Which agency will implement this programme in Sarawak? Up to now, how many SME entrepreneurs in Sarawak have successfully expanded their businesses through this programme? What is the target in terms of the number of SME entrepreneurs who will be assisted in Sarawak? Next, the second is Item 90000 – Graduate Training Scheme. This year an allocation of RM5 million has been provided. It is well known that many graduates leave public and private higher education institutions (IPTA and IPTS) every year. Among them, many do not get job offers and many are interested in venturing into entrepreneurship. Therefore I would like to know, how will this allocation be spent by the government in terms of the implementing agency mechanism, especially in Sarawak? Does the government have a specific strategy to guide these graduate entrepreneurs to produce more graduate entrepreneurs, especially in rural Sarawak.

Thirdly, I go to Item 00603 – Entrepreneurship Programme and Item 00606 – Micro Enterprise Development under the Perbadanan Perusahaan Kecil dan Sederhana Malaysia (SME Corp. Malaysia). This year RM10 million has been provided for the entrepreneurship programme compared with no allocation in 2022, and RM5 million for micro enterprise development. I ask the Honourable Minister to give details of the types of entrepreneurship programmes specific to Sarawak this year. What is the target of small and medium enterprises that will benefit? What is the number of enterprises that have successfully gone through this programme in Sarawak? Fourthly, Item 30000 – Tabung Ekonomi Kumpulan Usaha Niaga (TEKUN). This year a very large allocation has been provided, namely RM330 million compared with only RM25 million in 2022. We know that TEKUN Nasional plays a role in providing financing facilities easily and quickly to Bumiputera to start and develop their businesses. I would like to know specifically for Sarawak, what is the expected financing target for 2023? I would like to know, what percentage of

micro, small and medium enterprises (PMKS) in Sarawak who received TEKUN financing or loans experienced non-performing loans, with permission, last year? We very much welcome this fairly large allocation. However, I would like to know, were there any problems faced by TEKUN Nasional in recovering loan repayments during the COVID-19 pandemic from 2020 to 2022? What role has TEKUN Nasional played for traders affected by the pandemic? Financing from TEKUN is very important in helping PMKS, and Betong hopes that the application process can be facilitated and bureaucratic red tape reduced. Finally, I go to Item 96000 – National Entrepreneurship Institute (INSKEN), for which RM10 million has been provided. I would like to know what the focus or direction of this institute is? Given that there are also other institutions running similar programmes for entrepreneurs, is there coordination among the various institutions offering programmes for entrepreneurs so that they are more effective and efficient? Does the ministry intend to establish INSKEN branches for the states of Sabah and Sarawak? Lastly, does INSKEN have plans to hold regular short workshops or courses for rural entrepreneurs in Sarawak? I await the answer from the Honourable Minister. Thank you.

Mr ChairmanEN

Alright, I invite the Honourable Member for Bagan Serai.

Datuk Idris bin AhmadPAS · PNBagan SeraiEN

Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Mr Chairman. Item 020100 – Policy and International Relations. I ask the Ministry to state, for the period from 2018 to 2022, how many entrepreneurs, whether under the guidance of SME Corp or others, have successfully been upgraded from local to national and global level? Of that total, how many entrepreneurs are there by state? My final question on this item: what is the projected return to the government from this increase in entrepreneurial activity? Item 030100 – Cooperative Management. Based on the answer of the Honourable Minister, to date there are 2,581 cooperative convenience stores known as CoopMart operating throughout the country. Therefore, I ask the Ministry to state the number by district. Second, since the Ministry will offer incentives on daily essential goods of up to 20 per cent cheaper than usual, does the Ministry intend to increase the number of these CoopMart cooperatives to help the people of Malaysia cope with the challenge of high food prices? Third, the Honourable Minister also stated that CoopMart's participation in the Koperasi Prihatin Rakyat Sale and the Keluarga Malaysia Cheap Sale in the period of 2021 and 2022 achieved savings of RM9.28 million. The Ministry also intends to hold the same incentive this year, beginning in Perak. My question is, what constraints does the Ministry face in carrying out this initiative in several different places, given that the increase in food costs is not limited to only certain places? Moreover, the agencies and parties involved are also more or less the same, even though the government has changed.

Datuk Idris bin AhmadPAS · PNBagan SeraiEN

Item 040500 – National Entrepreneurship Institute (INSKEN). In the Budget 2023 estimate, INSKEN received an operating allocation more than triple that of 2022, namely from RM3.6 million to RM11 million. My question is, what factors caused INSKEN to be given this increase in allocation? Second, within the five-year period from 2018 to 2022, how many entrepreneurs has INSKEN developed in capacity, and what percentage of them are categorised as successful entrepreneurs? Third, to what extent do entrepreneurs, both those who have only recently ventured into the entrepreneurial world and those who have been in it for a long time, have access to INSKEN's services in developing their capacity? To what extent does INSKEN identify great potential among entrepreneurs in order to develop them? Item 90000 – Graduate Training Scheme. I ask the Ministry to explain, how many graduates applied for and successfully obtained this training scheme over the five-year period of 2018 to 2022? To what extent has this training scheme succeeded in producing genuine entrepreneurs after these graduates complete their training period? Item 00607 – PKS Master Plan. From what I have found, the latest PKS Master Plan ended in 2020. Therefore, does the Ministry intend to establish a new PKS Master Plan, and when will it be announced? In the PKS Master Plan 2012–2020, three main targets have not yet reached 100 per cent, as statistics for 2021 show that the contribution of PKS to the national GDP was 38 per cent, three per cent below the target. The contribution of PKS employment to total employment stood at 48 per cent, 17 per cent below the target. The contribution of PKS exports to total exports was 12 per cent, 11 per cent below the target. Therefore, will the new PKS Master Plan set the same targets or higher rates? Most importantly, what are the Ministry's short-, medium- and long-term plans in that master plan to achieve the main targets set? One more thing, Mr Chairman, namely Item 020300 – Franchise and Vendor Development. What was the sales value of franchise companies in 2021–2022? How many local and foreign franchise companies are there? How many local franchise companies have been able to penetrate the international market? How much GDP has franchising contributed to our country from 2018 to 2022? My last question. ANGKASA needs to be more proactive in getting involved in franchising so that the profits can be enjoyed by other cooperative members. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Muar.

Thank you, Mr Chairman. During the time the country was hit by COVID-19, many small entrepreneurs were successfully born. Some were desperate, and some also managed to find new opportunities because of that desperation. Not only the story of Makcik Kiah that we often hear, but there are also many young entrepreneurs such as Saudara Adib, who runs Banana Dibs, which is very famous and viral and has continued to this day. Saudara Adib is a well-educated young man who, in August 2020, successfully completed his studies at a pilot school. However, because the country was hit by COVID-19, he had to postpone his intention to become a

pilot and started his small business selling fried bananas. However, through his efforts and those of his friends, today he has succeeded in selling more than 70 kilograms of bananas in just three hours, and the business has continued to grow very rapidly.

My question is this: now that the country has entered the post-COVID-19 pandemic era, how will the government continue to protect and help the fortunes of small traders such as Saudara Adib through Banana Dibs, and many others who now want to find a new, permanent site with clear and assured funding? Perhaps in the future they want to expand small businesses into SMEs and, who knows in the future, into larger businesses. I hope that the Ministry of Entrepreneur and Cooperative Development can monitor those who were previously pilots, engineers, lecturers, who could not work but have set up their small businesses. What is their status? What can we do to help protect them and guide them out of the post-COVID-19 pandemic situation? There must be a permanent business place and business site so that they are not evicted, and ensure they receive proper protection. We want to ensure that young entrepreneurs, especially those who managed to establish themselves during the COVID-19 period, remain relevant and can expand their businesses after the pandemic period ends. Second is Item 90000 – Graduate Training Scheme. I would like to propose that the Ministry expand this scheme not only to graduates but also to work with the Ministry of Higher Education to extend this scheme to the Student Training Scheme as well, because the culture of entrepreneurship can be instilled at the university level itself. We need to encourage our students to do business, but it is not enough if we only give them one-off funds. There are two things we need to help students who want to do business. Let me give an example. One young man, named Naim, a graduate of the Royal Military College, started his small business at the International Islamic University Malaysia called 'Wow Kaw Kaw'. It began when the university provided a small site for him to do business. Today it has grown rapidly throughout Malaysia. Many young people, who are employed, are with him. But the beginning was at the university when assistance was provided. However, there are two problems. If we want to produce more young student entrepreneurs at other universities. First, I hope the Minister can work with the Ministry of Higher Education to propose flexible study hours as has happened in many Western countries and leading universities, where after the COVID-19 pandemic they combine online distance learning and classes can be given flexibility to be concentrated on two to three days each week, so that on different days they can focus on becoming entrepreneurs, working part-time, and especially if they come from families with a poor background, they receive support, have part-time work, and can become entrepreneurs to cope with the rising cost of living and to pay their tuition fees. Second, the Ministry should work with the Ministry of Higher Education to ensure that bureaucracy does not burden these young entrepreneurs, especially if they run businesses off campus while working part-time. This is because to this day there are universities that impose a curfew, even though these young students are adults. They are grown-ups, and they have clear evidence that they are part-time workers, young entrepreneurs, though small, but established off campus. If evidence can be shown that they are small entrepreneurs working part-time, I hope these people can be given relief from the bureaucracy and the curfew imposed at public or private universities. I hope this can

be done, because the culture of entrepreneurship can be nurtured from a young age at the university level and then at the graduate level. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Langkawi. The Honourable Member for Langkawi is not present. I invite the Honourable Member for Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Chairman, for the opportunity given to me. Before I begin my debate, I also take this opportunity at noon today to wish Selamat Menyambut Hari Polis to all our PDRM members who are celebrating the 261st Police Day today. Of course, this celebration is more meaningful with the attendance of His Majesty the Yang di-Pertuan Agong at the celebration this morning. The first point I want to make in the debate on the Ministry of Entrepreneur and Cooperative Development under P.26. First, I want to congratulate this Ministry because if we look at the development allocation in the previous year, it was only RM355 million. However, under the Budget 2023, the Belanjawan Madani, our allocation has jumped 50 per cent to RM520 million. An addition that, in my view, is very significant and will have a major impact and benefit for entrepreneurs and traders, especially the SMIs involved. The first point I want to mention is under Item 30000 – Tabung Ekonomi Kumpulan Usaha Niaga (TEKUN). If we look at the actual expenditure in 2021, it was only RM5 million. Last year the allocation was RM25 million. This time it has received a jump of RM330 million. More than 10 times. I think this shows a very good commitment from the government towards this need. I also found that RM10 million has been allocated under this TEKUN specifically for youths from poor families to earn income through business. So, in my view it is a good effort so that youths from poor families, whose lives and family incomes are always in the condition people call kais pagi makan pagi, kais petang makan petang, are helped. We help. However, I hope we do not put a ceiling of RM10 million. If possible, we should give more. This is because young people often have many ideas. New ideas that we may never have thought of, that are not conventional businesses, but online and so on. So I ask that this ceiling not be imposed so that more young people can get involved. I also want to ask about this TEKUN. What was the previous ceiling? This is because previously we were told there were two types of small financing with a ceiling of RM50,000, and for medium businesses the ceiling was RM100,000. Will it be increased? What are the special programmes or scope of funding from TEKUN for the traders involved? One more matter regarding TEKUN as well. I ask this Ministry to give incentives to traders who provide Menu Rahmah. This is because those who provide this Menu Rahmah sell it for under RM5. Something very good to reduce the burden on the people. So how do we encourage more restaurant and eatery operators to participate? So I hope this is the way. Is there any special fund or incentive award for them? This is because otherwise they will say, we sell cheaply, the cost of goods and raw materials are all the same. There is no profit. So I ask this Ministry to give encouragement to them.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

May the Honourable Member for Rasah seek to intervene?

Tuan Cha Kee ChinDAP · PHRasah

Tajuk sama?

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

The same heading. TEKUN.

Tuan Cha Kee ChinDAP · PHRasah

Ya.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Yes, thank you, the Honourable Member for Rasah. Honourable Minister, since TEKUN received the largest allocation of RM330 million, as we know, after the threat of the COVID-19 pandemic, many operators, especially micro-credit operators, face many problems in obtaining loans. So how do we ensure that this micro-credit scheme can be implemented effectively so that all these small traders benefit from the loans? That is the most important thing, so that we ensure they do not go and borrow from Ah Long. That is what we are worried about. Therefore we hope the Ministry can ensure that the allocation is distributed fairly. Will the Ministry continue the method it used previously, namely working with NGOs or other foundations to distribute the allocation, such as the Yayasan Penjaja dan Peniaga Kecil Malaysia (Malaysian Hawkers and Petty Traders Foundation)? Thank you.

Mr ChairmanEN

The Honourable Member for Kota Melaka should ask the Honourable Member for Rasah, so that the Honourable Member for Rasah asks the Honourable Minister.

Tuan Cha Kee ChinDAP · PHRasah

Ya.

Mr ChairmanEN

That is his way. He went straight to direct, which is not allowed.

Tuan Cha Kee ChinDAP · PHRasahEN

Mr Chairman, I ask that the speech of the Honourable Member for Kota Melaka be included in my speech.

Mr Chairman

Ya, baik.

Tuan Cha Kee ChinDAP · PHRasahEN

Mr Chairman, the last 30 seconds. Under Item 19530 – Programme for the Enhancement and Development of PKS. The previous year it was RM5 million, this time RM35 million. I welcome it.

Tuan Cha Kee ChinDAP · PHRasahEN

I think we need it, because after we enter this endemic era. After the endemic, there is a need to boost commercial economic activity in our society. So, I want to ask, what are the programmes under this heading that will benefit the target groups? That is all from me. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you. I invite the Honourable Member for Jerlun.

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, I take this opportunity to debate Operating Expenditure B.26 under the Ministry of Entrepreneur and Cooperative Development. I refer to Item 030100 – Cooperative Management. As we are well aware, the Angkatan Koperasi Kebangsaan Malaysia Berhad, namely ANGKASA, is a cooperative representing the Malaysian cooperative movement, which was declared established on 12 May 1971 by the second Prime Minister, the late Tun Abdul Razak bin Hussein. Before that, a congress was held in 1966. From that date until today, almost 52 years, there has not been any further Malaysian Cooperative Congress. This congress is the most effective manifestation for scrutinising, proposing policy matters and implementation, and weighing up policies that are detrimental to entrepreneurs and cooperatives so that they receive attention from the Ministry of Entrepreneur and Cooperative Development. Therefore, I propose that this Ministry allocate a specific budget, not one-off, to hold a Cooperative Congress

Nasional secara tahunan ke arah pembangunan koperasi yang lebih mampan dan berdaya saing. Kedua, saya merujuk Butiran 030200 – Suruhanjaya Koperasi Malaysia (SKM). Meneliti bajet pada tahun lepas, tahun 2022, sebanyak RM73.3 juta. Pada tahun ini, tahun 2023, sebanyak RM74.8 juta, ada peningkatan sebanyak RM1.48 juta. Saya merujuk laman web Suruhanjaya Koperasi Malaysia (SKM), daripada segi organisasinya terdapat seramai 12 orang Ahli Lembaga Pengarah (ALP). Akan tetapi, hanya memaparkan lima orang ALP sedia ada dan tujuh orang ALP masih kosong. Jadi, persoalan saya, bilakah tujuh orang ALP tersebut akan dilantik sedangkan peruntukan SKM ditambah pada tahun ini? Saya juga mencadangkan kepada koperasi, Pengerusi SKM yang hendak dilantik itu hendaklah dilantik di kalangan pemimpin-pemimpin koperasi yang berkelayakan, berpengetahuan atau yang berautoriti dalam hal ehwal koperasi, bukan ditentukan oleh the Honourable Minister. Kalau the Honourable Minister diberi kuasa untuk melantik, sudah tentulah dia akan melantik orang-orang yang berkepentingan dengannya atau pemimpin-pemimpin politik yang kadangkalanya tidak ada pengetahuan langsung tentang pembangunan koperasi. SKM juga memberikan geran sebanyak RM30,000 sebagai bantuan asas iaitu sub bantuan fizikal dan sub bantuan koperasi baharu. Isunya bagi koperasi baharu ini yang ditetapkan oleh SKM, jika hendak mendapatkan geran mestilah mempunyai penyata kewangan keluar masuk terkini untuk tiga bulan dan mesti melampirkan laporan audit untuk dua tahun terkini. Masalah yang berbangkit yang dihadapi oleh koperasi baharu iaitu status koperasi itu baharu. Apabila baharu, tidak ada aktiviti yang dibuat. Apabila tidak ada aktiviti, maka tidak ada penyata kewangan yang hendak diaudit. Apabila tidak ada penyata kewangan yang hendak diaudit, maka tidak ada laporan audit. Tidak ada laporan audit, maka tidak ada Mesyuarat Agung Tahunan. Apabila tidak ada Mesyuarat Agung Tahunan, maka itu menggagalkan koperasi untuk mendapatkan geran pembangunan ataupun geran untuk memajukan koperasi. Jadi, ini boleh menyebabkan koperasi yang baru ditubuhkan itu menjadi tidak aktif atau mungkin ditutup dan ini merugikan koperasi tersebut terutamanya koperasi yang ditubuhkan melibatkan produktiviti orang-orang kampung. Oleh itu, saya mencadangkan SKM mengkaji semula dua syarat ini iaitu mesti melampirkan penyata kewangan tiga bulan berturut-turut dan laporan audit dua tahun yang terkini tanpa memberikan sebarang syarat yang merugikan koperasi. Carilah pendekatan-pendekatan yang meringankan koperasi. Jadi, itulah ucapan saya yang berkaitan dengan B.26 di bawah Ministry of Entrepreneur and Cooperative Development. Sekian, Mr Chairman. Assalamualaikum.

Mr ChairmanEN

Waalaikumusalam. Terima kasih Honourable Jerlun. Saya jemput Honourable Libaran.

Datuk Suhaimi bin NasirUMNO · BNLibaranEN

Terima kasih Mr Chairman. Pertama sekali, saya berterima kasih kepada Mr Chairman atas kesempatan yang diberikan kepada saya untuk mengambil bahagian dalam perbahasan peringkat Jawatankuasa Ministry of Entrepreneur and Cooperative Development. Mr Chairman, Butiran 020300 – Pembangunan Francais dan Vendor. Mr Chairman, saya melihat menerusi butiran ini, terdapat pengurangan peruntukan Pembangunan Francais dan Vendor daripada RM3.97 juta pada tahun 2022 kepada RM2.21 juta pada tahun 2023. Saya pohon penjelasan terhadap pengurangan peruntukan ini dan saya berpandangan industri francais dapat membantu usahawan kecil dan sederhana membangun perniagaan mereka ke peringkat yang lebih tinggi. Saya ingin mengetahui apakah usaha yang akan dilaksanakan oleh kementerian dalam melahirkan lebih ramai usahawan francais terutamanya di peringkat Parlimen Libaran? Apakah bentuk bantuan yang akan diberikan kepada PKS untuk

Datuk Suhaimi bin NasirUMNO · BNLibaranEN

mentransformasikan perniagaan mereka kepada francais supaya mampu berdaya saing dengan jenama besar dan kemudian dikembangkan ke peringkat global? Sehingga kini, berapakah jumlah perusahaan kecil dan sederhana yang telah berjaya mengembangkan perniagaan kepada francais? Tuan Pengerusi, Butiran 020500 – SME Corporation Malaysia (SME Corp. Malaysia). Saya melihat terdapat banyak produk perusahaan kecil dan sederhana berkualiti tinggi yang berpotensi untuk dipasarkan ke luar negara. Di kawasan Parlimen Libaran juga turut terkenal dengan pelbagai produk PKS seperti produk kraf tangan di Taman Cahaya Batu 12, Rancangan Sg Manila, produk lekor dan takoyaki di Kampung Sungai Batang Batu 10, produk kerepek di Kampung Batu Puteh, pembuatan roti di Kampung Sungai Sibuga Besar dan Rancangan Sungai Manila dan produk makanan kering seperti ikan bilis dan udang kering di Kampung Batu Puteh yang turut berpotensi untuk dipasarkan ke luar negara. Melalui peruntukan sebanyak RM39 juta di bawah butiran ini, adakah terdapat sebarang bentuk ruang dan peluang yang disediakan oleh kementerian khususnya untuk pengusaha PKS di Parlimen Libaran untuk memasarkan produk mereka ke luar negara? Apakah bentuk platform yang akan disediakan untuk masyarakat bumiputera khususnya pengusaha PKS untuk mengeksport produk mereka ke luar negara? Sejauh manakah penekanan kementerian terhadap usaha untuk mengembangkan serta memasarkan produk halal PKS ke luar negara memandangkan eksport produk halal turut mempunyai potensi perdagangan yang besar? Tuan Pengerusi, Butiran 040300 – Pembangunan Kapasiti Kontraktor. Menerusi butiran ini, saya melihat kerajaan telah memperuntukkan RM1 juta bagi Pembangunan Kapasiti Kontraktor. Saya menyambut baik terhadap peruntukan ini. Namun begitu, apa yang menjadi persoalan saya, adakah ia mencukupi? Saya ingin tahu sejauh manakah peruntukan sedia ada mampu meningkatkan usaha untuk menambah bilangan kontraktor bumiputera baharu? Bagaimanakah kementerian akan memastikan kontraktor bumiputera terutamanya generasi muda di negeri Sabah turut diberi peluang untuk lebih aktif dalam mengendalikan projek kerajaan? Apakah terdapat sebarang jaminan oleh kementerian untuk memberikan keutamaan kepada kontraktor bumiputera dalam projek-projek kerajaan?

Datuk Suhaimi bin NasirUMNO · BNLibaranEN

Tuan Pengerusi, Butiran 19530 – Program Peningkatan dan Pembangunan PKS. Menerusi butiran ini saya melihat kerajaan telah memperuntukkan sebanyak RM35,000,000 kepada Program Peningkatan dan Pembangunan PKS. Saya menyambut baik terhadap peruntukan ini. Namun, apa yang kita harapkan di sini terutamanya sekali pengusaha-pengusaha kecil dan sederhana di kawasan Libaran menerusi Program Peningkatan Pembangunan PKS ini. Berapakah jumlah sasaran pengusaha kecil dan sederhana yang akan dibantu melalui Program Peningkatan dan Pembangunan PKS ini terutamanya di kawasan Libaran? Sekian, terima kasih.

Mr ChairmanEN

Terima kasih, Honourable Libaran. Saya jemput sekarang Honourable Bukit Gantang.

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Chairman dan Ahli Dewan yang saya muliakan, Ministry of Entrepreneur and Cooperative Development ini sangat-sangat penting sebab ia mewujudkan nukleus asas kepada support industry yang lebih besar. Cuma daripada segi peruntukan ia agak kecil daripada kementerian-kementerian lain. Walau bagaimanapun, ada penambahan di bawah Kod 20000, Kod 30000 dan Kod 40000 sebanyak RM164,379,000 telah ditambah untuk melaksanakan program usahawan ini.

Berdasarkan perbelanjaan ini, apakah konsep yang akan dilaksanakan oleh kementerian? Sebagai contoh, di Jepun, program vendor yang dimulakan di Jepun sehingga menyebabkan vendor-vendor yang diwujudkan oleh syarikat-syarikat besar dapat mengeluarkan produk sendiri dan eksport. Begitu juga di Thailand, terkenal dengan One Village, One Product sehingga perkampungan tersebut menjadi terkenal dengan produk yang telah pun dikeluarkan. Di Bangladesh, wujudnya community government bank. Ini juga membantu mereka untuk menjadi usahawan-usahawan yang berjaya. Saya merujuk Butiran 020500 – SME Corporation Malaysia (SME Corp. Malaysia). SME Corp merupakan – Menyelia dan menguruskan PKS. Daripada laporan yang saya baca, 213 program telah dilaksanakan yang melibatkan 479,588 orang usahawan. Saya minta the Honourable Minister menyenaraikan kesemua yang telah mendapat latihan dan pinjaman, apakah status mereka? Maju dan berjaya? Sederhana dan membangun atau yang gagal? Seterusnya, apakah plan untuk memberikan peluang kedua kepada mereka yang gagal? Butiran 30000 – Economic Fund for Business Group Ventures (TEKUN). Saya lihat penambahannya amat memberangsangkan iaitu sebanyak RM305 juta. Ini menunjukkan bahawa kerajaan menunjukkan fokus untuk memberikan bantuan pinjaman secara kecil-kecilan untuk membantu usahawan-usahawan di luar bandar. Di bawah TEKUN ini ada dua skim. Skim pertama ialah Skim Pinjaman Kecil (SPK), maksimumnya sebanyak RM50,000. Kemudian skim pinjaman kedua ialah Skim Pinjaman Sederhana, maksimumnya RM100,000. Dalam keadaan ekonomi sekarang, kos harga barang dan kos sara hidup yang meningkat, jumlah ini tidak mencukupi untuk mereka memulakan perniagaan. Saya mencadangkan agar kementerian di bawah peruntukan yang besar ini menaikkan tahap maksimum bagi SPK kecil kepada RM100,000 dan sederhana kepada RM250,000 atau RM500,000. Projek-projek kecil ini boleh kita bahagikan kepada beberapa sektor untuk diberikan perhatian dan kebanyakannya berada di luar bandar. Kalau kerajaan serius untuk membangunkan, tanpa ada rasa fobia kerana kebelakangan ini rasa fobia kerajaan kepada orang miskin dan kepada pemuda-pemuda yang kurang pendapatan. Jadi, kalau tidak ada rasa fobia kerajaan kepada kawasan-kawasan luar bandar yang majoriti Ahli Parlimennya ialah PN, kami sentiasa bersedia untuk menghulur tangan membantu membangunkan usahawan-usahawan kecil dan sederhana ini. Jadi, saya harapkan kerajaan lebih telus dan lebih prihatin, tidak mengira kawasan mana mereka datang. Sekian, terima kasih.

Mr ChairmanEN

Terima kasih. Saya jemput Honourable Segamat.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Terima kasih Mr Chairman atas peluang untuk saya membahaskan rang undang-undang perbekalan peringkat Jawatankuasa bagi KUSKOP. Saya mulakan dengan Butiran 00601 – Dana Pembangunan dan Pembiayaan PKS. Saya menyambut baik keprihatinan Ministry of Domestic Trade and Cost of Living yang telah melaksanakan penggantian sijil perakuan pendaftaran perniagaan secara percuma kepada golongan peniaga yang kehilangan sijil perniagaan akibat banjir yang baru-baru ini berlaku. Pelaksanaan tersebut seharusnya disambut baik juga dengan sokongan inter-ministry daripada KUSKOP dalam aspek penyediaan pembiayaan sokongan kepada mereka khususnya penggiat PKS yang berdepan dengan risiko kerugian modal perniagaan, khususnya di daerah Segamat. Banyak premis perniagaan termasuk kiosk, F&B, kedai runcit serta kedai gunting rambut yang mengalami kerosakan aset perniagaan akibat banjir. Kerosakan tersebut sudah tentu memberi impak kepada kelangsungan perniagaan mereka lebih-lebih lagi bulan Ramadan yang juga merupakan bulan terbaik untuk mereka mencari rezeki akan menjelang dua hari lagi.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Oleh sebab itu, KUSKOP yang merupakan kementerian yang bertanggungjawab dalam hal ehwal perusahaan kecil dan sederhana seharusnya telah mewujudkan sistem identify to channel, with permission, yang boleh menyediakan secara berfasa dan juga berfokus peruntukan sokongan kepada penggiat-penggiat PKS yang telah dikenal pasti mengalami kerosakan aset serta kemudahan perniagaan. Berhubung dengan perihal tersebut, saya minta the Honourable Minister menyatakan, yang pertama, apakah saluran yang disediakan oleh KUSKOP untuk mendampingi penggiat-penggiat PKS di dalam daerah Segamat yang memerlukan pembiayaan sokongan atau peruntukan pemulihan perniagaan kepada penggiat PKS yang terkesan? Kedua, apakah bentuk pemudah cara yang dilaksanakan menerusi agensi-agensi berkaitan KUSKOP bagi menyediakan keperluan-keperluan perniagaan termasuk barang modal untuk penggiat-penggiat PKS di kawasan-kawasan terjejas banjir untuk memulakan semula perniagaan mereka? Ketiga, berapakah jumlah dana pembiayaan PKS sokongan yang telah disalurkan sepenuhnya kepada penggiat-penggiat PKS di daerah Segamat? Apakah jaminan KUSKOP bahawa pembiayaan sokongan tersebut benar-benar berupaya menyokong mereka untuk memulakan semula perniagaan terutamanya perniagaan yang melibatkan aset fizikal yang melibatkan kos sewaan atau pemilikan yang tinggi? Mr Chairman, seterusnya Butiran 30000 – Economic Fund for Business Group Ventures (TEKUN). Menerusi peruntukan sebanyak RM330,000,000 yang disediakan bagi tahun 2023, saya ingin melihat TEKUN boleh menjadi harapan baharu kepada anak-anak muda terutamanya yang ingin menceburi dalam bidang perniagaan. Oleh sebab itu, TEKUN seharusnya melakukan penilaian serta semakan semula terhadap kriteria serta syarat yang ditetapkan sebagai pematuhan permohonan khususnya kepada pemohon yang terdiri daripada graduan baharu dari kawasan luar bandar. Walaupun ada peruntukan yang begitu besar, tetapi syarat-syarat ini telah juga menjadi satu punca mereka tidak dapat membuat permohonan dana. KUSKOP di bawah kepimpinan the Honourable Minister hari ini seharusnya mempunyai visi untuk memastikan usahawan desa yang berpotensi mampu dilahirkan secara progresif menerusi inisiatif serta penyediaan bantuan sokongan keusahawanan yang disediakan oleh TEKUN. Penambahan sebanyak RM275 juta bagi peruntukan pembangunan TEKUN merupakan penambahan yang signifikan yang boleh menggiatkan lagi partisipasi rakyat luar bandar khususnya Parlimen Segamat dalam bidang keusahawanan.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Justeru, menerusi nilai keyakinan yang digariskan sebagai antara rukun Madani, saya ingin mencadangkan agar TEKUN dapat dijadikan sebagai sebuah agensi pendorong kepada pelaksanaan Inisiatif Pendapatan Rakyat (IPR) yang direncanakan oleh Ministry of Economy. Menerusi sinergi tersebut, segala bantuan pembiayaan keusahawanan yang disediakan di bawah TEKUN boleh dipadankan dengan individu ataupun peserta IPR yang menepati syarat atau kriteria yang digariskan bagi satu-satu pembiayaan. Secara tidak langsung TEKUN menerusi pembiayaan yang diperuntukkan bagi tahun 2023 dapat memadankan bakat keusahawanan tertentu yang boleh memudahkan proses satu-satu permohonan bantuan sokongan keusahawanan yang dilakukan oleh pemohon. Cadangan suai padan TEKUN IPR tersebut juga mempunyai objektif yang mengurangkan idle time kepada seseorang pemohon yang sebelum ini terpaksa menunggu dalam tempoh yang agak lama untuk mengetahui status kelulusan permohonan mereka. Oleh itu, ini sahaja ucapan dan juga permohonan dan cadangan-cadangan saya kepada Kementerian KUSKOP untuk di pertimbangkan. Sekian, terima kasih Mr Chairman.

Mr ChairmanEN

Terima kasih Honourable Segamat. Saya jemput Honourable Dungun.

Assalamualaikum warahmatullahi wabarakatuh. Terima kasih Mr Chairman. Saya ke Butiran 10300 – SME Bank. Kemudahan kepada akses pembiayaan untuk membantu usahawan PKS dan PKS mikro. Jumlah peruntukan RM4 juta. Soalan saya, apakah jumlah ini mencukupi untuk membantu perniagaan berstatus mikro kecil dan di kalangan usahawan? Difahamkan juga bahawa kadar faedah pinjaman adalah agak tinggi. Adakah ini benar? Bolehkah dilihat semula kerana asas kepada penubuhan SME Bank ini ialah untuk membantu usahawan dalam akses pembiayaan bagi memajukan perusahaan mereka. Jadi, kalau boleh dilihat semula kepada apa yang didakwa itu untuk menjadikan mereka dapat melakukan perniagaan mereka berdasarkan kepada pinjaman yang diperolehi supaya memudahkan mereka untuk menguruskan perniagaan PKS mereka. Seterusnya Butiran 19535 – Pembangunan Sistem dan Infrastruktur ICT, teknologi maklumat. Bersesuaian dengan kita berada pada IR4.0, salah satu dari komponennya ialah Internet of Things (IoT), with permission, Mr Chairman. Jadi, melibatkan urusan penyelarasan, pelaksanaan dan pemantauan pembangunan teknologi kepada usahawan-usahawan. Bolehkah nyatakan apakah program-program latihan berkaitan teknologi maklumat yang telah dilaksanakan? Kedua, berapakah jumlah usahawan-usahawan tempatan yang telah berjaya beralih kepada khidmat digital di bawah program ini untuk kemajuan PKS dan PKS mikro perniagaan mereka? Butiran 020100 – Dasar dan Hubungan Antarabangsa. Bolehkah dinyatakan pelan tindakan dan program-program yang telah dilaksanakan bagi pembangunan dan pemerkasaan usahawan-usahawan di peringkat global. Butiran 020300 – Pembangunan Francais dan Vendor. Salah satu fungsi ialah mengenal pasti ruang pasaran baharu bagi produk-produk termasuk produk-produk baharu. Saya ingin untuk mengetahui sejauh manakah produk madu lebah yang telah dimajukan dan diusahakan oleh sebahagian usahawan-usahawan? Bagaimana usaha untuk memajukan usahawan-usahawan yang terlibat dalam perusahaan madu lebah ini? Seterusnya, berkait dengan sejauh manakah usaha merancang, menyelaras dan memperkukuh program kolaborasi program keusahawanan antara kerajaan dan swasta, telah dilaksanakan pada waktu ini terutamanya kepada kaum bumiputera. Kedua, bolehkah kementerian memberi contoh bentuk pengenalpastian ruang pasaran baharu produk bagi Program Peningkatan dan Pengembangan Usahawan atau PMKS. Butiran 020400 – Pusat Khidmat Kontraktor. Pertama, sejauh manakah peranan telah dimainkan oleh kementerian bagi memastikan kontraktor bumiputera mendapat tender kerajaan secara telus dan adil? Kedua, apakah contoh bentuk latihan diberikan oleh kementerian bagi memastikan kontraktor mendapat pendedahan dan ilmu secukupnya dalam bidang binaan? Butiran 030200 – Suruhanjaya Koperasi Malaysia (SKM). Berapakah jumlah koperasi yang aktif di seluruh Malaysia pada waktu ini dan koperasi yang tenat dan sakit serta jumlah koperasi yang telah mati? Bolehkah dinyatakan jumlahnya? Terima kasih Mr Chairman.

Mr ChairmanEN

Terima kasih dan sekarang jemput pembahas terakhir, Honourable Batang Lupar. Honourable Batang Lupar? Tidak ada? Kalau Honourable Batang Lupar tidak ada maka saya jemput the Honourable Minister, boleh?

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

Terima kasih Mr Chairman. Saya menghargai penyertaan Honourable Ipoh Timur,

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

Honourable Sungai Besar, Honourable Parit Sulong, Honourable Padang Besar, Honourable Sungai Siput, Honourable Rompin, Honourable Betong, Honourable Bagan Serai, Honourable Muar, Honourable Rasah, Honourable Kota Melaka, Honourable Jerlun, Honourable Libaran and Honourable Bukit Gantang, Honourable Segamat and Honourable Dungun who took part in the debate at the Committee stage for my ministry. I appreciate the views, proposals, inputs and specific matters raised throughout the debate just now. I would like to give an overview to this august House, especially to the Members who debated the ministry's budget. Under this Budget 2023 initiative, the Right Honourable Prime Minister has stated that the overall financing initiative for small and medium enterprises is RM40 billion. However, in my ministry, the total allocation is RM732 million. This covers operating expenditure as well as development expenditure. This means there is still more than RM39 billion in financing and development funds for small and medium enterprises placed across various departments and agencies in various other ministries. I would also like to share with this august House that more than 60 agencies are involved in entrepreneurship development. Under the ministry, only 10 agencies are involved in making the budget initiatives and the development of small and medium enterprises in our country a success. That is why, Mr Chairman and Honourable Members, we do acknowledge that the allocations channelled are quite large but have never been sufficient to meet the real needs of small and medium enterprises in our country. For example, the matter raised by the Honourable Ipoh Timur regarding social enterprises. I appreciate that proposal and, for your information, the ministry has held an engagement session to inform the Ministry of Finance, and I myself have already submitted a request for additional allocation to the Right Honourable Prime Minister as Minister of Finance to provide a supplementary budget to help develop social enterprises in our country.

Mr ChairmanEN

Honourable Minister.

Datuk Ewon BenedickUPKO · PHPenampangEN

I agree with the matter raised by the Honourable Member just now, that a special scheme, whether grants in particular, needs to be established so that social enterprises in our country can be helped.

Mr ChairmanEN

Honourable Minister.

Datuk Ewon BenedickUPKO · PHPenampang

Ya.

Mr SpeakerEN

It is now 1 o'clock in the afternoon. Can we stop to eat first, then take a break first? We will continue at 2.30 in the afternoon. Honourable Minister, refresh again, is that alright?

Datuk Ewon BenedickUPKO · PHPenampang

Boleh, boleh.

Mr Speaker

Baik.

Datuk Ewon BenedickUPKO · PHPenampang

Terima kasih.

Mr ChairmanEN

Honourable Members, the House resumes sitting as the House of Representatives. [The House resumed sitting] [Mr Speaker presided over the sitting]

Mr SpeakerEN

Insya-Allah, we will continue at 2.30 in the afternoon. That is all.

[The sitting was suspended at 1.01 in the afternoon]

[The sitting resumed at 2.30 in the afternoon]

Mr SpeakerEN

[The House sat in Committee] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presided

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Minister, please respond.

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

Mr Chairman, I would like to continue my winding-up on the matters raised in the committee-stage debate just now. First, from the Honourable Sungai Besar who touched on the Universiti Keusahawanan Koperasi Malaysia. For the information of the Honourable Member and this august House, IKMa has been allocated RM15.2 million in this budget. However, this budget does not involve operating expenditure for Universiti Keusahawanan Koperasi Malaysia. For your information too, UKKM received approval on 28 March 2022 and has now fulfilled two-thirds of the conditions for approval of the establishment and implementation of programmes from the Malaysian Qualifications Agency (MQA). The facilities audit of UKKM by the Department of Higher Education was carried out in mid-March 2023 and this is the final phase before obtaining operating approval, which is expected in May 2023. For your information too, UKKM has received approval from the Malaysian Qualifications Agency (MQA) and will offer five academic programmes, namely as follows:- (i) Diploma in Cooperative Entrepreneurship; (ii) Diploma in Cooperative Management; (iii) Bachelor of Business Administration (Cooperative Management); (iv) Bachelor of Business Administration (Cooperative Entrepreneurship); and (v) Master of Business Administration (Cooperative Management). The levels of programmes offered cover two diploma programmes, two bachelor's degree programmes and one master's degree programme. I would also like to explain the details of development expenditure under the ministry. First, the SME Enhancement and Development Programme of RM35 million. For your information, this budget is earmarked for two items: first, RM30 million to develop the Malaysia Entrepreneur Hub or Hab Keusahawanan Malaysia; and RM5 million more for the Cooperative Enhancement Programme. Among the programmes implemented under the Cooperative Enhancement Programme is the Capable and Confident Entrepreneur Programme (CARE), which is currently being implemented. Since the CARE programme was introduced in 2021, RM790,000 has been allocated to provide training, guidance and business grants to persons with disabilities (OKU). Meanwhile, the Malaysia Entrepreneur Hub aims to build three entrepreneurship hubs in the southern region, central region and eastern region with the allocation provided, and it will be implemented by UDA Holdings.

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

The second item concerns Halal Industry and Vendor Development involving an allocation of RM6.5 million. For the information of the Honourable Members, to help entrepreneurs regulate halal products in the market, the use of halal certification is controlled by the Trade Descriptions Act under the purview of the Ministry of Domestic Trade and Cost of Living (KPDN). In addition, the Department of Islamic Development Malaysia (JAKIM) and the state authorities constantly conduct compliance audits on premises that have obtained halal certification, where the validity period of this halal certification is two years. The mechanisms implemented or taken by my ministry to uplift rural entrepreneurs in the halal industry include: (i) Halal Entrepreneur Capacity Development Programme; (ii) Halal Product Capacity Development Programme; (iii) Halal Innovation and Technology Programme; and (iv) Halal Internationalisation Programme. The target of these four programmes is SME entrepreneurs and cooperatives across the country, including areas outside the towns. Halal awareness programmes are actively implemented by the ministry in cooperation with JAKIM, state authorities and agencies related to halal certification, giving confidence to consumers in choosing products that are developed or used. For your information, under the Vendor Development Programme— because some Honourable Members asked about the latest number of halal industry vendor companies and the amount affected by the pandemic. The vendors referred to under the Vendor Development Programme (PPV) are companies that collaborate with anchor companies in supplying equipment and services to those anchor companies. Anchor companies are local or international business entities that have the capacity to develop the vendors registered under them and enter into partnerships with the government. So far, 29 anchor companies with a total of 1,288 Bumiputera vendor companies have joined this Vendor Development Programme, which comprises nine sectors, namely automotive, transportation, oil and gas, energy, telecommunications, pharmaceuticals, plantation, property, services and construction. Meanwhile, to help develop the export of halal products at the international level, the ministry, through the Halal Internationalisation Programme, provides access for entrepreneurs and cooperatives to export markets on various international exhibition and trade platforms. In 2022, a total of 11 potential halal entrepreneurs joined Gulfood 2022, which recorded potential sales worth RM318 million and was held recently.

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

Next, Mr Chairman, regarding the matter of the details of the development budget for ICT systems and infrastructure, with a budget of RM2.35 million, this is an internal budget for the ministry to upgrade the data centre and data development, or the Disaster Recovery Centre, as well as the National Entrepreneur Repository and the cooperative information management system. It is not intended to develop digital-based entrepreneurs. This is because the development of digital entrepreneurs is placed under the agency MDEC, under the Ministry of Communications and Digital. Next, regarding Item 19900 – Vendor Development of RM15 million that was raised by the Honourable Bagan Serai and the Honourable Libaran in particular. The franchise industry is implemented by two ministries, namely my ministry and the Ministry of Domestic Trade and Cost of Living. Accordingly, no operating or development expenditure allocation that

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

has actually been channelled or allocated to my ministry. The development expenditure or allocation has been allocated to the Ministry of Domestic Trade and Cost of Living. However, Perbadanan Nasional Berhad (Pernas), as the agency responsible for developing local entrepreneurs, is committed to implementing development programmes using Pernas's internal allocation. Based on the franchise business report, it recorded the largest franchise industry sales value so far, amounting to RM26 billion compared with RM14 billion in 2020, which is an increase of 71 per cent in 2021. The government targets that 16 franchise industries will continue to grow by between 20 and 30 per cent this year. As of December 2022, there were 1,197 registered franchise companies. Of that total, 713 were local franchise companies and 428 were franchises from abroad. The ministry has always encouraged cooperatives to get involved in franchise business in order to boost the development and contribution of the franchise industry and increase income. So far, 55 cooperatives have ventured into franchise business in the food and services sectors, such as Ar-Rahnu X'Change Bank Rakyat. For the services sector, Marrybrown and Gloria Jean's Coffees for the food sector.

Honourable Minister, may I please interject?

Datuk Ewon BenedickUPKO · PHPenampangEN

Let me finish this first, can the Pernas part wait?

Okay, alright. I can wait.

Datuk Ewon BenedickUPKO · PHPenampangEN

The ministry, through Pernas, introduced the Business in Transformation (BIT) programme in 2013, which to date is a business transformation programme for micro entrepreneurs to become more competitive and systematic in running their business. Through this BIT programme, small entrepreneurs will be guided to upgrade their businesses in terms of image, business quality and business functions to help increase their sources of income. The financing provided under the BIT programme is up to RM500,000 and the financing period is up to 5 years. The BIT programme helps franchisor entrepreneurs introduce business models to prospective franchisees with packages as low as RM3,700. Since its introduction, 140 companies from various sectors such as food and beverage, retail, services and education have registered under this BIT programme. As of 31 December 2022, Pernas has approved financing to 313 BIT entrepreneurs amounting to RM9.9 million. Honourable Member, please.

Thank you, Honourable Minister. I am quite interested in this franchise issue. I listened carefully just now as the Honourable Minister explained that franchising involves two ministries. Last week I also asked the same thing to the Ministry of Home Affairs. So for that, I would like to ask, KPDN talks about how they only hold or are involved in making policies and related acts. However, from the development aspect, it is carried out under KUSKOP. So, is there any proposal to harmonise this matter, because for me the important thing is to revitalise this franchise. We know this franchise involves a large amount of capital to implement. So my question is, is there any proposal to consolidate so that the franchise sits in one ministry and its direction for the future is clearer. Thank you.

Datuk Ewon BenedickUPKO · PHPenampangEN

Thank you, Honourable Member. There is indeed such a proposal, and this matter has actually been discussed between my ministry

Datuk Ewon BenedickUPKO · PHPenampangEN

and the Ministry of Domestic Trade and Cost of Living. Pernas, as the agency for developing franchising, is still retained under my ministry to help develop the franchise sector in terms of enforcement of laws and so on. Licensing is still held by KPDN. In fact, if we look at it, the budget initiative has allocated a certain amount to also help develop the franchise sector in cooperation with the Franchise Association of Malaysia. Nevertheless, I agree with the views of the Honourable Member just now that there needs to be better coordination. If not, placing the agency with this ministry – those involved with this agency in one ministry, there needs to be better coordination. Mr Chairman, I would like to continue...

Datuk Idris bin AhmadPAS · PNBagan SeraiEN

Honourable Minister, Honourable Minister, Bagan Serai.

Datuk Ewon BenedickUPKO · PHPenampangEN

Franchise, is it about franchise, Honourable Member?

Datuk Idris bin AhmadPAS · PNBagan SeraiEN

Franchise, yes. Thank you, Mr Chairman, and thank you to the Honourable Minister. The franchise business industry is indeed good, but sometimes there is something that becomes frightening to traders, namely the royalty fees imposed by franchisors on the operators just now. Therefore, is there a limit set by the ministry for these royalty fees so that they do not burden these franchise entrepreneurs? Thank you, Mr Chairman.

Datuk Ewon BenedickUPKO · PHPenampangEN

Thank you, Honourable Member. I will check that matter because, as I stated earlier, there are certain matters under KPDN and some under Pernas. Anyway, I will check and I will get back to the Honourable Member. Mr Chairman, I would like to continue regarding Item 9000 – Graduate Training Scheme of RM5 million, a specific question from the Honourable Betong. For your information, Honourable Member, as of 31 December 2022, a total of 70 graduates from Sarawak joined the N-GENE Programme, out of a total of 2,300 graduates involved. Five initiatives implemented under the PROTÉGÉ Programme, which is under this Graduate Training Scheme, are: (i) New Generation Entrepreneur Online Incentive Training Programme (N-GENE). That is where the 70 people from Sarawak just now were involved; (ii) Career and Entrepreneurship Training Placement Programme for TVET graduates (GRACE); (iii) Reach-out, Awareness and Developmental Programme (ROAD); (iv) Student-Preneur And Biz Apprenticeship Programme (SPACE); and (v) Basic Entrepreneurship Training. Guidance and training initiatives covering grants and field visit programmes, and basic entrepreneurship awareness for graduates, are implemented under this Graduate Training Scheme programme. Next, the programme...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Minister.

Datuk Ewon BenedickUPKO · PHPenampang

Ya.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Datuk Ewon BenedickUPKO · PHPenampangEN

Yes, if time is up then the remainder I will convey in writing to the Honourable Members.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Jawapan bertulis.

Datuk Ewon BenedickUPKO · PHPenampangEN

I appreciate the views of the Honourable Members, especially the proposals that the allocation under my ministry should be increased. We really appreciate it if it is increased, of course more of our entrepreneurs can be developed.

Datuk Ewon BenedickUPKO · PHPenampangEN

However, as I said earlier, many ministries are involved and we work together and coordinate so that those who benefit are small and medium entrepreneurs and our cooperatives. Thus, I thank you. Salam Malaysia Madani.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Minister. The question is that the sum of RM212,141,400 for Head B.26, Estimates of Operating Expenditure 2023, forming part of the Schedule, be agreed to. [Question put and agreed to] [Head B.26 ordered to form part of the Schedule]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The question is that the expenditure under Head P.26, Estimates of Development Expenditure 2023, be approved. [Question put and agreed to] [Head P.26 approved as part of the Estimates of Expenditure]

Bill — Supply Bill 2023 and Development Estimates Motion 2023 Committee — Head B.27 [Schedule] – Head P.27 [Development Estimates 2023] –Bill

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Supply Head B.27 and Development Head P.27 under the Ministry of Works are open for debate. List of debaters for the Ministry of Works. Honourable Member for Rasah, Honourable Member for Besut, Honourable Member for Pekan, Honourable Member for Putrajaya, Honourable Member for Gopeng, Honourable Member for Kapar, Honourable Member for Betong, Honourable Member for Kulim-Bandar Baharu, Honourable Member for Tuaran, Honourable Member for Pasir Salak, Honourable Member for Bakri, Honourable Member for Gerik, Honourable Member for Kuala Pilah, Honourable Member for Hulu Selangor, Honourable Member for Pasir Gudang, Honourable Member for Kuala Krai, Honourable Member for Lubok Antu, Honourable Member for Parit Buntar, Honourable Member for Tawau, Honourable Member for Padang Terap, Honourable Member for Sandakan, Honourable Member for Kemaman, Honourable Member for Jelebu, Honourable Member for Kuala Krau, Honourable Member for Sungai Petani and Honourable Member for Sri Aman. I invite the first debater, the Honourable Member for Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Chairman, for the opportunity given to me to be the first debater this afternoon for the Ministry of Works. I will focus my debate only on P.27, which is the development portion, because for me, B.27 is more about administration, emoluments and so on, routine matters. However, P.27, the building of infrastructure, is what will bring added value and infrastructure facilities for the long-term benefit of the people. So, under the first item, namely Item 61000 – Road Upgrading and Item 80000 – Construction of New Roads, I combine them for this debate. I

Tuan Cha Kee ChinDAP · PHRasahEN

...under Item 61000, the allocation jumped from RM756 million in the previous budget to RM1.55 billion in this budget. An increase of almost 100 per cent. However, for Item 80000, the allocation dropped from RM68 million to RM10 million. I want to mention this here. This allocation is very important and must be increased every year because the current situation in Malaysia is that in most places, Federal roads under this ministry, under JKR, often face problems with damaged road surfaces that need attention. However, state roads that receive allocations from MARRIS, which are channelled directly from the Ministry of Finance to the state governments, are usually in better condition. So, it appears there are two classes, two different standards. Yet these Federal roads are the main roads linking cities or one town to another, and they are in fact main roads compared with state roads. So, for me, although this allocation is large, I praise it, I congratulate and commend this ministry, but it is not enough, Deputy Minister. It needs to be increased further because MARRIS received RM5.2 billion. It is still a long way off. So, this evening I am lobbying the Ministry of Works (KKR) to set aside a special allocation for road construction and road upgrading, so that there is more. Specifically for the Rasah area, I want to mention it openly today. Jalan Labu, about 16 kilometres long, needs to be upgraded because along Jalan Labu, if we look back earlier, it is easy to describe it as a village area. Now it is no longer a village. Previously there were no workshops or shops along the side, but today it is full of commercial areas and it has become a shortcut for those involved to avoid the PLUS highway during peak hours. So I request, I want to ask KKR, when will Jalan Labu be upgraded from two lanes at present to four lanes? That means two lanes for each direction. That is the first point. Second, regarding the proposal to KKR to build a special flyover from the Bandar Enstek Toll Plaza, the new Seremban toll plaza, straight to Jalan Lingkaran Tengah. I believe the Negeri Sembilan State Government, and I myself as the Member of Parliament for this area, have submitted the proposal, but it has not yet been approved. I know that building this flyover will indeed cost a great deal. However, I hope KKR can consider it and give a commitment. If not this year, perhaps next year under RMKe-12. This is because the area involved, within this four-kilometre stretch, is a road that is always congested. It no longer has peak hours, to put it simply. Every hour is a peak hour. So, please give attention to this because there are major development projects. Perhaps it is necessary to cooperate with, to ask for contributions from, developers. Sime Darby is there, IJM Land is also there. We must work together for the convenience and benefit of road users and also for the increasing traffic in the area. Another matter I want to mention under this item is regarding Jalan Lingkaran Tengah Seremban. I have already mentioned it many times. Previously I mentioned that RMKe-12 Rolling Plan 3 would be restarted by the previous government, two years ago. When? Jalan Lingkaran Tengah, at present, is a semi-ring. If the ring were a full circle, it is not complete. It has stopped for several years since Phase 3B Part 1 was completed. So, I request a commitment from KKR. Mr Chairman, may I have an additional 30 seconds for one more matter, namely under Item 10000 – PPP/PFI. I see an increase in the allocation from over RM800 million to RM1.3 billion at present. I want to ask, what types of projects are involved? If I am not mistaken, this involves cooperation with the private sector for the construction of major infrastructure. So, is there any project involved that is located under the Rasah Parliamentary constituency or not? This is because the Rasah Parliamentary constituency is among the fast-developing constituencies, with population growth requiring the construction

Tuan Cha Kee ChinDAP · PHRasahEN

additional infrastructure from the Federal Government so that our people always enjoy the best infrastructure facilities. That is all. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Rasah. I invite the Honourable Besut.

Thank you, Mr Chairman. I wish to refer to B.27 Item 020200 – Road Branch and also Item 040100 – Road Facilities Maintenance Branch. I combine them under P.27 Item 31000 – Construction of Roads and Bridges and also Item 80000 – Building New Roads. The allocation I see here is roughly RM3,106,000,000, and I request that RM8 million be allocated for the road in Besut, which is a main road that is quite badly damaged at present, between Kampung Tok Has and Kampung Nangka. It has been three years of constant patching, patching, patching. We want a new road. This is because there is actually the Royal Malaysian Air Force (TUDM) Gong Kedak here, the place where our leaders, when they usually visit the area, land at Gong Kedak. This road is also the main road from Jerteh to Kuala Besut, the place for boarding boats to Pulau Perhentian, and also an area that has been patched about 85 per cent.

I would like to know, has JKR taken up this application and when was it taken up? Why has no approval been given so far? We must remember that this area is used by all the people of Besut, regardless of whether they are rich or poor. The poor should not be insulted, do not say we pay the poor people to hold... [Applause] So, we will not do anything to cause chaos in the Besut area in particular. So far, many of these roads have actually been built. In nearby areas, in the Renek area too. Roads have been newly built, so there is no reason not to build them. We must remember that voters in the Besut district, roughly 35,000 people, are supporters of PH-BN, but we have many more, we number 50,000 people. So, if they want to take back the Besut area, Honourable Minister, do it quickly. If they want to take it back, that is the matter. I also wish to refer to several other roads that actually need to be newly built and upgraded, namely the construction of a free-flowing road from Kampung Raja to Tembila and also Renek. Renek is already in the Setiu area, but it can be connected. Also, the construction of a new road to connect Tembila and also Bukit Keluang. This is a recreational resort. The construction of a coastal road and the upgrading of the existing coastal road, and the construction of a new road from Kampung Durian Telor to Jalan Pelagat – Lata Tembakah, which is also a recreational resort. Finally, I wish to refer to the highway between Karak and the Gombak Toll, because over the past week or two I myself have been trapped by the jammed road, sometimes for two hours I was stuck. So, I ask that the road be widened and I hope that the ministry will take immediate action. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Besut. I invite the Honourable Pekan.

Thank you, Mr Chairman. First of all, I would like to touch on Item 30000 – Assets, which involves Head P.27. The operating expenditure estimate for 2023 shows an increase of RM26,270,600, which is an increase of 128 per cent compared with 2022, when only RM11,518,600 was allocated. I would like to ask and get an explanation from the ministry: what are the details of expenditure under this item, given that the increase is so high, as stated just now, 128 per cent? Mr Chairman, the second matter concerns the repair of damaged or pothole-ridden roads, an amount of RM100,000 allocated by the government to the district engineer to immediately carry out repairs of potholed roads based on complaints received. It is not specified under which item this RM100,000 allocation to the district engineer is placed, but in the development expenditure estimate, this allocation may be included under items such as Item 02800 – Repair, Replacement and Upgrading of Roads and Bridges, Item 31000 – Construction of Roads and Bridges, Item 60000 – Upgrading of Roads and Routes, Item 61000 – Upgrading of Roads and Item 71000 – Beautification and Rehabilitation of Roads. Logically, we expect the government to increase the RM100,000 to a more reasonable amount, because the damage to these roads needs to be repaired immediately, and this is a repair that is very important to road users. I would like to ask, what initiatives will the ministry implement in monitoring the condition of damaged roads, and not merely rely on complaints from the public? Next, Pekan would like to touch on...

Tuan Manndzri bin NasibUMNO · BNTenggaraEN

May I interject briefly?

The issue of upgrading or rehabilitating bridges through Item 02800 – Repair, Replacement and Upgrading of Roads and Bridges, Item 31000 – Construction of Roads and Bridges and Item 08230 – Construction of Bridges.

Tuan Manndzri bin NasibUMNO · BNTenggaraEN

Honourable Pekan, a brief interjection, Honourable Pekan. Just briefly, Tenggara.

Pekan would like to touch on it.

Tuan Manndzri bin NasibUMNO · BNTenggara

Sedikit sahaja

Tuan Manndzri bin NasibUMNO · BNTenggaraEN

Thank you, the Honourable Pekan. We also have a related matter with this bridge in my area, in the Tenggara Parliamentary constituency. A bridge here has collapsed due to the floods. So, I would like to ask JKR, if possible, that the bridge that collapsed due to the flood disaster also be expedited. Moreover, at present the Bailey bridge between Tenggara and Sembrong involves users from Simpang Renggam, also in the Kluang Parliamentary constituency, who have difficulty travelling from Kota Tinggi to Kluang, from Kluang to Kota Tinggi, and in accessing the nearby highway. Thank you, the Honourable Pekan.

Puan Wong Shu QiDAP · PHKluangEN

Honourable Pekan, may I continue? Let me give a little additional information for the Honourable Deputy Minister to answer later.

I do not have enough time.

Puan Wong Shu QiDAP · PHKluangEN

Briefly, 10 seconds. That bridge mentioned by the Honourable Tenggara just now is very important for road users between

Puan Wong Shu QiDAP · PHKluangEN

Kluang, Tenggara and also Kota Tinggi. Now, without the Bailey bridge, they have to take one hour up to two hours or more to go to other towns. So, it is important for the ministry to take a serious step to resolve this problem urgently. Do not wait any longer. They cannot wait six months or a year, it must be done immediately. Thank you, the Honourable Pekan.

Right. I would like to touch on the Sultan Abu Bakar Bridge, Pekan. I raised it in the previous debate, on 1 March 2023. The steps to save the Sultan Abu Bakar Bridge must be expedited. This is because recently, last week when I returned, the island has already moved towards the bridge. The danger is that when this emerging island moves towards the bridge, according to the physics theory I stated earlier, the bridge is likely to collapse. If a new bridge were to be built, it may cost RM150 million. Why do we not take measures to prevent the bridge from being destroyed? Secondly, I would like to touch on the upgrading of Road FT012, the Kuantan–Segamat Road, Rompin district. Although it is in the Rompin district, it passes through the Pekan district. We ask that JKR do something as quickly as possible because this road is very important to users. For the rest, I agree with the Honourable Besut and the Honourable Bentong that the Karak Highway from Gombak to Bentong is too congested and an appropriate way must be considered to enable road users to use this road without facing major problems, because this road is a toll road. Therefore, we ask the ministry to study what proposals there are to overcome this problem. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Pekan. I invite the Honourable Putrajaya.

Datuk Dr. Mohd Radzi bin Md. JidinBERSATU · PNPutrajayaEN

Thank you, Mr Chairman. First of all, I would like to take this opportunity to wish a Happy Police Day to all members of the Royal Malaysia Police (PDRM) out there, especially my friends in Putrajaya. Mr Chairman, I refer to Item 050700 – Maintenance and Bills for Federal Road Lights and Traffic Lights. In the 2023 Budget speech, it was stated that there was an allocation of RM50 million for the immediate installation of street lights at accident sites. As the administrative centre of the Federal Government, it is important for the government to ensure that roads in Putrajaya and access roads to Putrajaya are always in good and safe condition for road users. This includes having functioning street lights. In this regard, I have received many complaints about the absence of street lights on the following routes: (i) the route from Desa Pinggiran Putra to PICC, including Jalan Persiaran Selatan; (ii) the route from Cyberjaya to Precinct 5; and (iii) the exit from Maju Expressway (MEX) towards Putrajaya.

Datuk Dr. Mohd Radzi bin Md. JidinBERSATU · PNPutrajayaEN

This situation has persisted for a long time and is dangerous to road users. Therefore, I ask that part of the said allocation be used to maintain street lights on the routes that I have just mentioned, urgently, for the safety of road users. Next, Item 31000 - Construction of Roads and Bridges. For Putrajaya at present, the road from Persiaran Timur up to Precinct 15 is being built. I have been informed that the

Datuk Dr. Mohd Radzi bin Md. JidinBERSATU · PNPutrajayaEN

progress of its construction is rather slow. Therefore, I request that the construction be expedited for the convenience of Putrajaya residents. Mr Chairman, I would also like to touch on the maintenance of government quarters in Putrajaya for the category of landed properties, as termed, maintained by JKR. This matter is related to B.27 Item 040200 - Building Facilities Maintenance Branch and P.27 Item 060100 - Building Maintenance and Repair. I have received many complaints about landed quarters, as termed, that cannot be occupied because they have not yet been repaired. There have also been complaints relating to the excessively long period taken to repair these quarters. Accordingly, I request that JKR give attention to the repair of these quarters for the convenience of civil servants in Putrajaya. Under the allocation for P.27, there are several items related to maintenance and upgrading of roads. Among them are Items 02800, 60000, 61000, 08280 and 08600. On this matter, we are well aware that the construction industry is still in a period of recovery from the impact of the COVID-19 pandemic. Among the main challenges are rising prices of key building materials, including imported materials, shortage of labour, increases in the minimum wage, and cash flow issues faced by contractors. At times, these conditions can cause problems of stalled projects. Based on the existing approach to managing and rescuing stalled projects, we see that the procedures that must be followed to revive such projects take a long time. When the time taken is too long, the damage becomes worse and development costs rise because it involves increases in the cost of construction materials. I propose that the government...

Tuan Sabri bin AzitPAS · PNJerai

Yang Berhormat...

Datuk Dr. Mohd Radzi bin Md. JidinBERSATU · PNPutrajayaEN

...improve the existing procedures to ensure that stalled projects can be revived immediately.

Tuan Sabri bin AzitPAS · PNJerai

Jerai.

Sekejap.

Tuan Sabri bin AzitPAS · PNJeraiEN

Can the Honourable Minister list the stalled projects across the whole country. That is all.

Datuk Dr. Mohd Radzi bin Md. JidinBERSATU · PNPutrajayaEN

Include it in my speech, thank you. Mr Chairman, referring to the same item, part of that allocation is also specifically provided for minor maintenance for contractors G1 to G4. Regarding G1 contractors, there has been a significant increase in the number of G1 contractors in Putrajaya registered with CIDB. Most recently there are 182 G1 contractors in Putrajaya. The issue that arises is that tenders for G1 projects in the Putrajaya area are also opened to applications from contractors in other areas such as Hulu Langat, Petaling and Sepang. I have received many complaints from Putrajaya G1 contractors regarding this matter. Previously the number of G1 contractors in Putrajaya was limited, but since the number of Putrajaya G1 contractors has increased significantly, I request that G1 projects involving the Putrajaya area be given to Putrajaya G1 contractors, as this condition is set in other areas. Mr Chairman, next, Item 030900 - Education Works Branch. A little more, please. The demographic trend of population growth and density in Putrajaya is getting higher. This means the government needs to give serious attention to infrastructure development and the construction of new schools. In Putrajaya, the school construction projects in Precinct 17 and Precinct 5 were approved under the Second RMKe-12 Rolling Plan in 2022. In this regard, I ask that the Honourable Minister ensure that the construction of schools in Putrajaya is completed within the stipulated timeline.

Datuk Dr. Mohd Radzi bin Md. JidinBERSATU · PNPutrajayaEN

This is important because in densely populated areas such as Presint 5, there is only one school serving the communities in Presint 5 and Presint 6. With the completion of the new school, all Putrajaya schools can be retained as single-session schools, in addition to providing comfort to children and making things easier for parents. Finally, I extend my highest appreciation to the Public Works Department (JKR) Putrajaya, which has worked closely with various agencies, especially the Putrajaya Corporation, in striving for the best to ensure public infrastructure continues to be maintained and continuously improved. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Putrajaya. Honourable Gopeng is not in the House. I invite Honourable Kapar.

Dr. Hajah Halimah AliPAS · PNKaparEN

Thank you, Mr Chairman. Firstly, I would like to take this opportunity to wish a Happy 216th Police Day to all police personnel across the country, including the Deputy Speaker. I refer to P.27 Item 02800 - Repair, Replacement and Upgrading of Roads and Bridges. A total of RM137,700,000 has been allocated. Kapar requests that the government examine whether this estimated amount is sufficient to meet the needs of the whole country. Kapar is of the view that, as we have seen, there have been fairly large-scale natural disasters, floods involving Johor and so on, the East Coast, so I propose that this estimate be increased, to help JKR, yes. With reference to Item 020200 - Roads Branch, especially emoluments, how many district engineers does the country need, and how many is optimal to meet the needs of the country, including Sabah and Sarawak? Is there any specific training for road engineers, especially to ensure that the problems we face are suited to climate change, suited to the increasing number of natural disasters, the increasing volume of traffic, do we have upgrading skills, knowledge and perhaps technology? Item 030000 - Building Infrastructure Construction and Item 030900 - Education Works Branch. Kapar requests a timeline for the construction of Sekolah Kebangsaan Telok Kapas, and if possible, could it be provided in writing, even if it is just what has been approved by the Ministry of Education. Thank you, Ministry of Education. With reference to B. 27 Programme 030500 - Health Works Branch. I also request that JKR provide a timeline for the construction of Hospital Kapar, as well as the human capital allocation that has been directed to focus on the construction of this Hospital Kapar, so that the project can be implemented according to the timeline that has been set. Item 040000 - Maintenance of Immovable Assets and Item 040100 - Road Facilities Maintenance Branch, emoluments RM10,000. How many persons have been placed as members of the road facilities maintenance team, and what is the job scope they need that requires RM8,466,000. P.27 Item 71000 - Beautification and Rehabilitation of Roads. Kapar requests that Honourable Minister pay attention to the complaint that was sent to [email protected]. I am reading this verbatim. "To whom it may concern. Please refer to the photo provided. Please take immediate action because many people have fallen off their motorcycles, especially at night..." There is more that someone added here, she said, this is verbatim, yes. "Well, there are many factories lined up here, big lorries passing by. Anyway..." This is what it is, yes. Finally, Mr Chairman, Item 050000 - Special Programmes, Item 050700 - Maintenance and Electricity Bills for Street Lights and Federal Traffic Lights. Kapar

Dr. Hajah Halimah AliPAS · PNKaparEN

wants to know what mechanism the government has to ensure that the allocation of as much as RM49,000,000 for that purpose is carried out perfectly, meaning, what is the ROI? Is the monitoring team a proactive government initiative, or is it merely reactive, responding only when there are accidents or viral user complaints like this, perhaps? It would be good if this complaint were channelled to .gov.my, but some might be on TikTok and so on. How long does it take, what is the benchmark set by the government for repairing broken traffic lights, because it affects many users who will be delayed. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kapar. Honourable Pasir Gudang, to replace Honourable Gopeng.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you, Mr Chairman. Pasir Gudang would like to debate Head P.27, Development Purpose under the Ministry of Works, with reference to Item 61000 – Upgrading of Roads. In 2023, the government seems to have allocated a large sum, RM1.5 billion, for upgrading roads in Peninsular Malaysia. This is an increase of about 100 per cent compared to only RM756 million in 2022. I would like an answer from the Honourable Minister: of the RM1.549 billion allocated for upgrading, what is the breakdown for road upgrading in Peninsular Malaysia in each state? Second, from the allocation provided, does it include repairing damaged roads in the states hit by floods, such as on the East Coast, Kelantan, Terengganu and also Johor recently? Next, Mr Chairman, under Item – 61000 Road Upgrading, allow me to touch on a local issue, namely the Pasir Gudang Highway, which in recent days many have come to know is in very bad condition, pot-holed and very dangerous. Cars are damaged, car rims can be bent, some have even died. So my question to the ministry is, how many millions are allocated to repair and upgrade the Pasir Gudang Highway? It has several phases and has not been fully completed. So, when will all the phases to upgrade this Pasir Gudang Highway be completed? Another issue.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Honourable Pasir Gudang, you may add a little.

Tuan Hassan bin Abdul KarimPKR · PHPasir Gudang

Sila, sila.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Yes, do you agree or not with me, Honourable Pasir Gudang, that we need a way to improve the Pasir Gudang Highway comprehensively, not in the current way that many say is just touch and paste. We must make a more concrete, more comprehensive plan so that the Pasir Gudang Highway issue can be resolved once and for all. Thank you.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you, Honourable Tebrau. Please include the interjection from Honourable Tebrau in my debate. I add that we make policy here. The government issues allocations, but in the end, it is the contractors in the local area who carry out the upgrading of the roads. The question is, is there monitoring being carried out? I refer, for example, to Pasir Gudang, is the ministry satisfied with the contractor

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

who carries out this work, who maintains this? In the end, the total the government allocates to repair and upgrade highways across the whole country runs into billions of ringgit. I would like to raise an unhealthy situation. Only consortium companies monopolise projects and tenders for upgrading, repairing and maintaining roads in certain states, especially in Johor. I believe this unhealthy practice must be stopped. An open tender, give opportunities to other companies. Do not let the consortium keep monopolising, and this is not good. So, that is all, Mr Chairman. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Pasir Gudang. I invite Honourable Betong. Honourable Betong?

Thank you, Mr Chairman. I thought there was a change earlier, Betong with Honourable Sri Aman, swapped. But it's alright, I can go first. Good afternoon, peace be upon you. I thank you for the opportunity once again to take part in debating the budget at the committee stage under Head B and P.27 Ministry of Works. I go straight to Item 09280 – Construction of Roads in Sarawak. I see a very significant increase in allocation from RM154.7 million last year to RM222 million this year. So, I would like to know in detail. Please, Honourable Minister, what road projects will be built under this item? Next, the second matter, Item 10000 – PPP/PFI. This year, RM1.309 billion has also been allocated. This is a very high amount and an increase from the budget provided last year. I also ask the Honourable Minister to detail the projects proposed under this item given the large amount. So Betong also wants to know whether there are proposed projects for Sarawak as well. Third, Item 82000 – Pan Borneo Highway Sarawak. This year RM2.0 billion is allocated compared to RM1.316 billion last year. So Betong also wants to know, what is the latest target for completing the implementation of the Pan Borneo Highway in Sarawak? In connection with that, I would also like to ask about the SSLR Project, which is the Sabah-Sarawak Link Road Project. This project under RMKe-11 has been handed over to the Ministry of Works as the client ministry. What is the latest status of the Sabah-Sarawak Link Road 1 and 2 Projects, whose main objective is to create a continuous paved road network linking Sarawak and Sabah without passing through the country of Brunei Darussalam?

Honourable Betong.

Please, Honourable Minister, answer.

May I interject briefly?

Silakan.

Thank you, Honourable Betong. Honourable Betong, I would like to ask, what is the Honourable Member's view on the item— The Honourable Member is talking about the Pan Borneo Highway.

I would like to ask the Ministry of Works about the Central Ring Project, namely CSR, the road between Bentong and Kuala Pilah. Where we see this project is still stalled from Kampung Chinta Manis all the way to Pelangai. So, I feel it is a very important need to continue this project, and I need a clear explanation from the ministry. Second, I would like to slip in a little under Head B.27, Item 050700 – Maintenance and Electricity Bills for Street Lights and Federal Traffic Lights. I would like to ask Honourable Betong's opinion on whether it is very important, that is, adding street lights especially on the Karak highway? We can see the difference on the highway, where in Gombak it is very bright, but after Genting Sempah, entering the Pahang area, it is pitch dark. This needs to be improved and I feel— what is Honourable Betong's view?

Mr Chairman, I very much agree with the proposal from Honourable Bentong just now, because street lights, when the area is bright, will reduce problems or accidents on the highway.

So, I request that Honourable Bentong's speech be included in Betong's debate. [Applause] I have one more paragraph to finish. Next, regarding the Pan Borneo matter just now. Betong would like to raise a little issue regarding P-turns, or P-turn roundabouts, used on highways in Sarawak. In the Betong parliamentary area, I request urgent attention from the ministry because many complaints have been received from local residents. For the information of Honourable Minister, the Pan Borneo Highway passing through the Betong area is almost fully completed. However, two P-turns have been built at the wrong locations and have troubled road users because they have to go to the next P-turn six to seven kilometres away, return trip. Then, secondly, there are road users who often take the easy way by driving their vehicles against the flow of traffic because they are unwilling to travel six to seven kilometres to the next P-turn. This poses a danger to road users. Therefore, Betong requests that the two P-turns be built urgently under this year's allocation, namely the two P-turns leading to the Ulu Paku-Spaoh junction and the other leading to the Melayu Hilir-Layar Betong junction, with the scope of installing street lights as raised by Honourable Bentong just now, along with road furniture. That is all, thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Betong. I invite Honourable Kulim-Bandar Baharu.

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

Alright, thank you to Mr Chairman. I would also like to wish a Happy Police Day to all police personnel in Malaysia, especially in the Kulim-Bandar Baharu parliamentary area. I would like to debate matters relating to the Ministry of Works in the Development Expenditure Estimates for the year 2023. Mr Chairman, Item 61000 – Upgrading of Roads, allocation for the year 2023 amounts to RM1.5 billion. I would like to request that Road FT136 Kulim to Serdang and also FT136 Serdang to Bandar Baharu, FT170 Selama to Mahang and FT171 Serdang to Selama be upgraded so as to provide comfort to users, because they are quite dilapidated, narrow and dangerous to users, especially motorcycles, and the percentage of accidents on these roads is increasing, especially during peak hours and also during festive periods and school holidays. The estimated length of the road is about 50 kilometres for FT136.

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

For Item 08230 – Bridge Construction. Referring to the Sungai Ular Bridge, Taman Seri Mahkota, Road FT136 Kulim to Serdang, which was demolished almost a year ago and still has not been rebuilt. I request that the construction of this bridge be expedited. The question here is also, why is it taking so long to rebuild this bridge? Is it because of budget problems or contractor problems? Item 80000 – Construction of New Roads. I request the ministry to ensure the quality standard of the construction of new roads is upheld and complied with. This relates to the Sungai Batu to Dublin road, which has just been completed but has already suffered severe damage. I also hope that not only will new roads be built, but close monitoring is also constantly carried out by JKR. Item 050700 – Maintenance and Electricity Bills for Street Lights and Federal Traffic Lights, where the allocation for the 2023 budget is RM49 million. For FT136 Kulim to Serdang, and Serdang to Bandar Baharu, it needs to be increased to avoid accidents, as well as maintenance of street lights that have not functioned for almost years, and broken traffic lights especially in traffic areas and school areas are also still not maintained. Item 71000 – Beautification and Rehabilitation of Roads, where the allocation is almost RM24 million for the 2023 Budget. For the 2023 Budget for item 71000, I request that this maintenance monopoly be broken up to small contractors, especially G1 contractors, where at present it is only monopolised, for example in Kedah and Perlis, by the company THB Sdn. Bhd. So, because of this monopoly, small contractors have less work and may face problems in their businesses. Mr Chairman, I also request that something be done to reduce the constant congestion between Juru Toll and also Sungai Dua Toll, which are always congested. Mr Chairman, I also request a written answer from the ministry. The ministry should have complete, accurate data that is in line with the question asked, such as the ministry's answer to me on 6 March last, which was not at all appropriate. I am very regretful about the answer given because this answer cannot be used by me to answer questions from the people. I also request that for the year 2023, the budget for JKR Kulim-Bandar Baharu be increased, given that the Kulim-Bandar Baharu parliamentary area is a rural area that needs urgent attention. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kulim-Bandar Baharu. I invite Honourable Tuaran.

Thank you, Mr Chairman, for giving Tuaran the opportunity to also debate the 2023 Budget at the committee stage of the Ministry of Works. Before that, allow me also to wish a Happy 216th Police Day to police personnel, especially in the Tuaran parliamentary area. Tuaran begins the debate on Development Purpose 27 Item 82000 – Pan Borneo Highway. Mr Chairman, congestion along the Federal Road from Kota Kinabalu, Tuaran, Ranau, Telupid, Sandakan has been raised in this esteemed House many times. Moreover, that road also suffers much damage, is full of potholes, and at one point along the Tuaran road more than five cars were stranded at the roadside at one time because of burst tyres and bent rims. Mr Chairman, if there are those who wish to become astronauts today, do not worry, everything is now much easier. You only need to come yourself and drive a car in Sabah. The experience is just like being on the surface of the moon, with potholed roads on the sides, at the back, left and right.

Tuaran would like to ask why this happened. What steps have been taken to ensure that the Federal Highway in particular has high durability? When the construction of the Pan Borneo Highway project was launched in 2015, the people of Sabah and Sarawak received the announcement with great joy. This toll-free highway is expected to be completed this year, 2023, for Sarawak, while Sabah will be completed in 2027. Tuaran would like to ask whether the implementation in Sabah and Sarawak is on target or not. For a state as large as this, what percentage has been completed? If it is behind target, what steps are being and will be taken to ensure its implementation is on target? Mr Chairman, I can say that so far the people of Sabah are not satisfied with the achievement of the implementation of this Pan Borneo project. Many side effects have occurred, such as floods that have caused much property damage. In this regard, Tuaran would like to ask whether an Environmental Impact Assessment (EIA) report has been made for this project, and whether that report is just one report covering the entire 2,239-kilometre alignment of the highway, or whether the EIA report has been broken down by packages.

If so, how many EIA reports have been done? Could the Honourable Minister give a highlight or clarification on the main conditions of approval stated in the environmental impact mitigation in that EIA report? Tuaran is raising many questions about the implementation of this Pan Borneo because many communities have been greatly affected. The extraordinary flood at Sugud, Penampang last year, and also the flooding along the Telipok–Berungis alignment in Tuaran every time it rains for two hours, are linked to the implementation of Pan Borneo. Likewise the conditions of dark street lights and potholed roads along Jalan Berungis, which have caused accidents and damage to vehicle tyres for vehicles passing there every day. Tuaran also wants to know whether there is coordination in the implementation among stakeholders, especially the Drainage and Irrigation Department (JPS), the Sabah Water Department, Sabah Electricity Sdn. Bhd. (SESB), the Lands and Surveys Department and related agencies. Tuaran asks all this because I understand that the allocation for building drainage at Giling Laut in Tuaran under JPS still does not exist, even though that drainage is the main mitigation for the flood problem there. Has the EIA report identified that environmental impact? If so, why has the allocation for constructing that drainage still not started until now? Likewise with the pipe installation by the Sabah Water Department from Telibong 2 Water Treatment Plant, which until now has not been able to begin installation because the pipe alignment has not been finalised due to the Pan Borneo Project that is not yet complete. This failure has caused disrupted water supply affecting more than 100 villages and housing areas in Zon Sulaman, Zon Sungai Damit and Zon Telipok in Tuaran. Mr Chairman, I humbly request that matters concerning this Pan Borneo be carried out in a good manner so that these problems can be resolved, and that what is being implemented in Sabah can also participate as has been implemented in Sarawak. I respectfully support this motion, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Tuaran. I invite the Honourable Pasir Salak. Honourable Pasir Salak? Not in the House? I invite the Honourable Sri Aman.

Thank you, Mr Chairman. I refer directly to Item 50000 – Other Expenditure. Mr Chairman, since the operating expenditure estimate already covers emoluments, assets, services, supplies and so on, why is there still a need for an allocation for other expenditure amounting to approximately RM1.6 million? My question is, I seek an explanation from the Ministry of Works regarding this allocation. Next, I would also like to ask the ministry whether it could provide details of how this will be spent? Next, Mr Chairman, I would also like to raise matters concerning roads and bridges in Sarawak, referring to Item 09280 – Construction of Roads, which has an estimate of RM222 million for 2013. Mr Chairman, since Sarawak is still rather left behind or underdeveloped in terms of infrastructure compared with Peninsular Malaysia, I consider this allocation to be very inadequate. So my question, Mr Chairman, is whether these figures only cover projects that have already been identified, or whether they are only allocations for new projects that must be applied for on a case-by-case basis, with permission. Next, Mr Chairman, taking into account that the Federal Government is determined to balance development in Sarawak, including Sabah, with the Peninsula, I propose that, first, the access road to Sri Aman be upgraded from a two-lane, two-way road to a four-lane, two-way road from the junction of the Pan Borneo Highway to the Simanggang town centre, including the installation of traffic lights. This is because, Mr Chairman, the population of Sri Aman has now increased and is estimated at approximately 95,000 people. This figure does not include other road users, with permission, such as visitors or tourists who come to Sri Aman, so traffic congestion often occurs, especially during festive seasons, and road accidents are also increasing. So I humbly request that my proposal be considered by the Ministry of Works and accepted by the ministry, because Mr Chairman, once this project is carried out, the Federal Government's initiative wanting Sarawak to continue to develop will also be proven. My next proposal, Mr Chairman, is to request the construction of a footbridge for pedestrians and motorised users crossing the Pan Borneo Highway, and the addition of a service lane one kilometre long on both sides of the Pan Borneo Highway at Pekan Lachau, in the Sri Aman section. This is because once the Pan Borneo Highway is fully completed, the highway will be used even more rapidly. Given that there are many longhouses and villages on both sides of the highway in the Pekan Lachau area, which is well known as a must stopover destination, with permission, because in this town there are various local food products, fruits and vegetables, including handicrafts, it is no wonder that this town is also congested with various vehicles. Mr Chairman, we are indeed happy because this town is developing rapidly, but we must take into account the safety aspect, especially for local residents, including local hawkers who want to cross or cross over the highway to get to Pekan Lachau. So I request that this proposal also be given consideration by the ministry. Finally, Mr Chairman, I would like to touch on Item 82000 – Pan-Borneo Highway, which has been allocated RM2 billion this year. As a son of Sarawak who has long waited for this project since many years ago, namely since 2015, I very much hope that with an allocation this large for 2023, the Pan Borneo Highway Project can be completed according to the schedule set. However, I would like to request that the ministry provide details regarding this allocation amounting to RM2 billion, how will it be used?

Second, and lastly, will the Pan Borneo Highway section from the junction to Pekan Simanggang to Bukit Begunan be completed this year? That is all, Mr Chairman, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Sri Aman. I invite the Honourable Gerik.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Thank you, Mr Chairman. Peace be upon you, the mercy of Allah and His blessings, and greetings of peace. Gerik would like to express a million thanks for being given the opportunity for this budget debate session at the committee stage of the Ministry of Works. Gerik would also like to take this opportunity to wish a Happy 216th Police Day in 2023 to all police personnel, especially in Gerik and Pangkalan Hulu, and in general across Malaysia. Mr Chairman, firstly, referring to B.27 page 305, Item 050700 – Maintenance and Electricity Bills for Street Lights and Traffic Lights on Federal Roads, which allocates RM49 million. Gerik would like to request details of the allocation for the Gerik Parliamentary constituency for street lights, especially where there are very few in corners, forest routes or plantation areas, and junctions, three-way junctions leading into state roads or village roads. Gerik would also like to request that the Malaysia–Thailand border road in the Kampung Lalang, FELDA and Thailand area, FT1157, and the Betong Pangkalan Hulu to Thailand road, which is road FT077, be given priority in the addition of street lights. Both these roads should be given priority.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

This is important as an early preventive measure to curb smuggling activities, cross-border crime and any issues involving the safety and lives of residents nearby, because this road is the Malaysia–Thailand border road. This matter has long been complained about by residents. Gerik hopes there will be a budget and allocation provided in 2023 this year. Mr Chairman, secondly, referring to P.27, page 306, Item 60000 – Upgrading of Roads and Routes and Item 61000 – Upgrading of Federal Roads in Peninsular Malaysia, totalling RM241,701,000 and RM1,549,405,000. Gerik would like to request details, what is the final total allocation provided for the East-West Trunk Road FT004, especially in the areas under the Gerik Parliamentary constituency. This is because, referring to the Oral Question and Answer Session held on 28 February 2023, the Honourable Deputy Minister of Works informed as follows, "For the repair and maintenance plan for 2023, the Public Works Department (JKR) has identified the damage that has occurred in the area and has prepared a maintenance estimate of RM113.355 million to carry out repair works on the East-West Trunk Road." FT004. From that initial answer, Gerik is very honoured because the government, especially the Ministry of Works, has efficiently allocated a sum of relevant allocation for repairs and for the welfare of the people. Taking into account the obsolescence of that road, user safety, and that it involves eight Parliamentary constituencies, Gerik is very moved and expresses a million thanks to the ministry for this matter. Mr Chairman, the third matter refers to P.27, page 306 under the same item, Item 60000 and Item 61000. Gerik would like to obtain details regarding the allocation for Federal Road FT076 in 2023, which involves five Parliamentary constituencies, namely Kuala Kangsar, Padang Rengas, Lenggong, Gerik and Baling. Is there any budget or allocation, especially in my constituency of Gerik, and what is the amount?

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

As in my earlier debate, taking into account that this road is the main road for residents in the Gerik Parliamentary constituency and the main road for tourists wanting to visit Hulu Perak and the Thai border at Pengkalan Hulu. Route FT076, 163.7 kilometres long, or better known as Route 76 by motorcycle convoys in Malaysia, has great potential to be developed because there are various world-class tourism products, and its road should rightly be given attention by the ministry. In conclusion, I would also like to call on the ministry to help and review contract prices and so on to assist the construction industry and contractors, especially G1 class contractors, taking into account the recent increases in prices and the cost of building materials. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Gerik. I invite the Honourable Kuala Pilah.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, the mercy of Allah and His blessings. Mr Chairman, Kuala Pilah goes straight to Item 050700 – Maintenance and Electricity Bills for Street Lights and Traffic Lights on Federal Roads, read together with Item 60000 – Upgrading of Roads and Routes. Mr Chairman, the Felda Kepis Scheme located in the Kuala Pilah Parliamentary constituency was opened since 1981. However, the road connecting to the main road, namely FT1275, has not been equipped with street lights since it was first cleared and built. The dark condition of the road makes residents' activities difficult, especially at night and early morning. It is very dangerous for those using that route. Therefore, Kuala Pilah requests that the ministry consider the proposal to install street lights along this road to facilitate residents, because most residents there need to go out early in the morning to manage their farms. Mr Chairman, I go straight to Item 60000, namely Upgrading of Roads and Routes, from Ulu Bendul to Melang, Kuala Pilah. After the construction of the new Bukit Putus Road, the work to widen the road from Bukit Putus to Sawah Liat or to Ulu Bendul has been completed. Initially, actually, the construction of this was originally phased, namely from the construction of the new Bukit Putus Road until – The proposal would, in phases, reach Kuala Pilah, namely the upgrading of the roads that I have mentioned. However, Kuala Pilah would like to ask, what is the status of the phased construction of this road which has stopped at Ulu Bendul and is not as per the original plan, namely to upgrade and widen the road as far as Kuala Pilah? Mr Chairman, Kuala Pilah refers to Item 040100 – Road Facilities Maintenance Branch, and also together with Item 050700 – Maintenance and Electricity Bills for Street Lights and Traffic Lights on Federal Roads. Road maintenance is very important to ensure the condition of the road is maintained as its original state in terms of geographical features and structural strength, and to control the rate of road damage to guarantee the safety and comfort of users of that road. The Ministry of Works needs to establish a more holistic evaluation system to measure the key performance indicators of concessionaires that have received tenders to supervise and maintain federal roads. The awarding of contracts should also be based on these KPIs to ensure that only concessionaires who truly live up to the expectation, with permission, namely excellent and quality, are appointed to continue and ensure roads are maintained well.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

What mechanism is used by the ministry to ensure that these concessionaires who received tenders to supervise and maintain roads meet the KPIs that have been set? Kuala Pilah would like to ask, how is the performance of these concession holders under the evaluation of the Ministry of Works?

Honourable Kuala Pilah, 10 minutes. Eh, 10 again. 10 seconds. [Laughter]

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

If it's 10 minutes, I suggest only the Honourable Jelebu...

Regarding this concession, Honourable Kuala Pilah. Honourable Kuala Pilah mentioned concession, Mr Chairman, the performance of this supervising and maintenance company is getting worse. 25 years he has held the contract, if I am not mistaken. The Honourable Minister can confirm it, 25 years but the service is getting worse from time to time, with permission. Roads are damaged, floods he does not repair, he says wait for allocation. JKR rejects the concession, the concession rejects JKR. Please, Ministry, do look at it. 25 years. If he does not perform, then you terminate it. Change this concession. Thank you, Honourable Kuala Pilah. Thank you.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

Kuala Pilah approves the request of the Honourable Jelebu. [Laughter] Mr Chairman, I go straight to Item 81000 – Construction of New Roads (New Projects). Efforts to upgrade existing roads or build new roads can accommodate projected traffic growth as well as enhance connectivity that will support economic development in the local area in particular, and the country in general. As I stated earlier in my initial debate, there is an urgent need to build an alternative road from Seremban to Kuala Pilah towards the East Coast since 20 years ago. It is understood that a study for this alternative route is also being carried out by JKR. Therefore, Kuala Pilah hopes that this study can be done carefully and in depth so that an accurate and specific report can be produced for the use or benefit of all those who will receive the spillover effect, with permission, from that route. In the past, highways were built to ease congestion on old roads and users paid tolls to enjoy comfort and shorten travel time. But now, the situation is different. The reality, Mr Chairman, is that we now pay tolls to enjoy congestion on highways, especially during festive seasons, which results in travel time also becoming longer. As an alternative, Kuala Pilah argues that the construction of new roads and new routes is what will solve the problem of severe congestion on highways today. Mr Chairman, apart from this new alternative road construction, there is also a need to build a new shortcut road from Kuala Pilah to Tampin.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

I just ask for a little more on what was taken up by the Honourable Jelebu earlier. A new shortcut road from Kuala Pilah to Tampin via Melang to Senaling to reduce severe traffic congestion in Kuala Pilah. Previously, the Honourable Minister of Works also mentioned that the Kuala Pilah shortcut project has been included in the Road Network Development Plan 2030. Proposals for the construction of the shortcut have been brought to meetings at the district level and given priority. However, I understand it did not receive priority from JKR's own evaluation. Therefore, Kuala Pilah hopes that the Ministry of Works

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

The Ministry can give priority to this project again because its cost is lower and it will have a good impact on road users in Kuala Pilah. Therefore, Kuala Pilah once again today extends best wishes for the 216th Police Day to the Honourable Deputy Speaker and also to the police personnel out there. Wabillahi taufiq walhidayah, wassalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kuala Pilah. I invite the Honourable Hulu Selangor.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Bismillahi Rahmani Rahim Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you, Mr Chairman. Mr Chairman, I now move on to P.27, Item 02800 – Repairing, Replacing and Upgrading Roads and Bridges. The estimated expenditure is RM137,700,000. I would like to ask the Ministry. Out of the total Estimates of Expenditure for 2023, how much has been allocated to each Parlimen? How is an allocation determined before it is distributed? What method is used to determine the appropriate amount of allocation for an area? The area of each Parlimen differs, and so does the number or density of the population in each area. The major problem in Hulu Selangor is related to insufficient funds to repair road infrastructure and street lights. Although its population is not as large as in some other areas, its size requires the attention of the Ministry to repair damaged roads and street lights. Mr Chairman, among the problematic matters are the street lights and roads in the Parlimen Hulu Selangor, especially at Jalan Bukit Tagar and also several areas such as the FELDA areas, towns, small towns and village areas that need improvement. Any repair of street lights is subject to approval from the Ministry. I request that the Ministry look into and give serious consideration to the applications that have been submitted for the Hulu Selangor area to rehabilitate street lights and roads in the areas that need them. [Mr Speaker presides over the Committee] Mr Chairman, next, the same Item P.27, Item 02800. The Federal Road Upgrading Projects FT1208 and FT3208 have been applied for. It has been informed that these projects have been shortlisted for approval at the Federal Government level under the title Federal Road Upgrading Project FT1208, Simpang Kampung Koskan to Bandar Sg. Buaya and FT3208, missing link from Simpang FT01, Sg. Choh to Bukit Beruntung, Hulu Selangor District. I also request the upgrading of the Federal Road from Sg. Choh to Tanjung Malim. Many have already died on this road, especially motorcyclists. Most recently, yesterday, a young man passed away, reportedly after swerving to avoid a pothole. Before that, a police officer who had just started serving was also killed because of this road. I earnestly request that the Ministry explain whether the Ministry can approve the applications that have been submitted to the RMKe-12. Because many roads are problematic and can threaten the safety of road users. In addition, this road is also an alternative route to avoid congestion on the North-South Expressway. I earnestly request that this matter be given attention. Next, still under the same code P.27, Item 02800. The Bridge Project at Batang Kali. The project has been delayed for almost five years; it was supposed to be completed in 2019 and

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

the latest expected completion is September 2023. I request that the Ministry explain when this bridge will be fully completed. Has the Ministry set aside sufficient funds to ensure this project can be expedited? Next, still under the same code, Item 02800, involving Taman Serendah Makmur. This taman has existed for 14 years but there is no specific access road to this taman. It uses another route, the road to the temple. Whenever there is an event at the temple, it makes that route difficult for us to pass and there is also flooding. So, I earnestly request that the Ministry pay attention to this matter. Next, Mr Chairman, code B.27, Item 040300 – Slope Engineering Branch. The estimated expenditure cost is RM7 million. I request that the Ministry explain the latest status of the slope repair works that are in progress at Batang Kali. When is completion expected? The concern of local people and outsiders, this involves local people who work there and also outsiders who pass through this Jalan Genting, including all the states that will pass through this road, requires it to be expedited, to complete the problem that has recently occurred, which collapsed recently. I request that the Ministry take appropriate action and as quickly as possible. Finally, Mr Chairman, I extend the greetings of the 216th Police Day, 'Polis dan Masyarakat Berpisah Tiada' (The Police and the Community Are Inseparable). That is all, thank you.

Mr ChairmanEN

Thank you, I invite the Honourable Sungai Petani.

Dr. Mohammed Taufiq bin JohariPKR · PHSungai PetaniEN

Assalamualaikum warahmatullahi wabarakatuh, thank you Mr Chairman for allowing Sungai Petani to take part in the Head of Development Supply 27 – Ministry of Works. Sungai Petani also wishes to extend greetings for the 216th Police Day to all police personnel, especially in the Sungai Petani area. Mr Chairman, Sungai Petani wishes to touch on Item 020000 – Road Infrastructure Development and Construction Industry Development. Sub-item 020200 – Road Branch. Mr Chairman, I would like to know the latest status of the 23 projects worth RM2.2 billion in the Northern Zone under the Twelfth Malaysia Plan that have been announced. I understand that these projects include the upgrading of Federal Roads, the construction of new roads and bridges, and the upgrading of drainage systems. I also understand that a total of RM675.5 million has been allocated for the state of Kedah. I request that the Ministry list these projects. What is the latest status of the implementation of the Ministry of Works projects under the RMKe-12, especially for the state of Kedah? Mr Chairman, under the same item I would also like to take this opportunity to raise the problem of traffic congestion faced in Sungai Petani. We see that in Sungai Petani, as time goes on, Sungai Petani is increasingly developing, with many industries growing rapidly; there are now more than 400 housing estates with a population of approximately 500,000 people. We see how those who work in Pulau Pinang have also moved to Sungai Petani because of cheaper house prices. So, we see that this traffic congestion has become a nightmare for the people of Sungai Petani, especially during school hours and working hours. Based on feedback I have received, these roads are facing chronic congestion, namely along Jalan Lencongan Timur, from Jalan Hospital Pakar Metro to the traffic light at Jalan Kuala Ketil, the road towards Masjid Tunku Puan Habsah and Jalan Hospital Lama towards Institut Kemahiran MARA Sungai Petani. These narrow roads cause extraordinary and very severe traffic congestion in Sungai Petani. On average, we see that every week there is definitely one

Dr. Mohammed Taufiq bin JohariPKR · PHSungai PetaniEN

accident. These roads must be upgraded and widened according to population density. I also request that a traffic study be carried out in Sungai Petani and that road widening is necessary. This is because after more than a decade, even decades, Sungai Petani – despite the population increase, the road widening has remained the same. Even if flyovers cannot be built, perhaps we also propose building roundabouts, smart traffic lights and coordination between the traffic lights on the Sungai Petani roads.

Honourable Sungai Petani, may I interject?

Dr. Mohammed Taufiq bin JohariPKR · PHSungai PetaniEN

Yes, please, Honourable Ledang.

Thank you, Honourable Sungai Petani. Also related to upgrading the road widening and bridges, I would like to raise the matter of Item 02800 – Repairing, Replacing and Upgrading Roads and Bridges. There is the status of widening three bridges from Jalan Sungai Mati to Bukit Gambir which has been outstanding since 10 years ago. This matter was raised in 2019. The tender should have been opened and work should have started in 2020. However, until 2022, it still has not been completed. So, I request that this matter receive attention from the Ministry. If possible, start this year, and in two years' time we can see fewer accidents, especially for motorcyclists. Thank you, Honourable Sungai Petani.

Dr. Mohammed Taufiq bin JohariPKR · PHSungai PetaniEN

I request that the speech of the Honourable Ledang be included in my speech. Mr Chairman, I would like to touch on Item 050000 – Special Programmes and Item 050700 – Maintenance and Bulb Replacement of Street Lights and Traffic Lights on Federal Roads. I would like to know, which Federal Roads are categorised as dark and risky, and what is the status of street light installation in those areas? What are the government's efforts to reduce the risk of accidents? I would also like to know the status of the work to replace lamps with the LED type throughout the country, including in the state of Kedah, especially in the Sungai Petani area. When does the Ministry expect the roads across the country to be fitted with this LED type of lighting? In the Sungai Petani area, a little, Mr Chairman. Sungai Petani, we request that more street lights be added along Jalan Kuala Ketil, the route from Bandar Puteri Jaya to Kuala Ketil, and the route from Sidam Kiri to Kulim. There are also areas in Sungai Petani that do not have street lights, such as the road heading to Padang Serai, while at Taman Keladi, there are poles but no lights. So, Mr Chairman, with this I end my speech with thanks.

Mr ChairmanEN

Alright, thank you. We invite the Honourable Kuala Krai.

Thank you, Mr Chairman, for giving Kuala Krai the opportunity to take part in the committee-stage debate on the Ministry of Works. I would like to touch on Head B.27 Item 040100 – Road Facilities Maintenance Branch. I would like to ask why the allocation for this item shows only a slight increase, amounting to RM133,000 only, in 2023 compared with the year

2022? I am worried that it will hamper the efforts of the Public Works Department (JKR) to ensure the process of upgrading roads runs smoothly, given that more and more roads are damaged, especially after floods. I would like to touch on the condition of the CSR Highway from Gua Musang to Kuala Lipis and from Bentong to Bulatan Mempaga, continuing to the Karak Highway. I hope the government will monitor the condition of this route more seriously. This route is the main route used to reach Raub and Lipis, which is the constituency of the Honourable Deputy Minister himself, and continues on to Kuala Krai and Kota Bharu, Kelantan. I find that this route is not being properly maintained. The road is very undulating and endangers users, and at the same time, the surrounding environment does not look very pleasant. Mr Chairman, in addition, many white lines have disappeared and are not visible along the road. This certainly makes it difficult for drivers, especially at night and during rain. The same item, Mr Chairman. I would like to ask whether the government monitors the federal road maintenance concession companies, especially the route from Bentong – Gua Musang all the way to Kota Baharu? This is because I find that many roads that have just been maintained quickly become damaged; in fact, within just a week, a newly resurfaced road has become full of potholes again. I am very aware of this because I use this route every week, especially during Parliament sitting seasons. Mr Chairman, I refer to Head B.27 Item 050700 – Maintenance and Bulb Replacement of Street Lights and Traffic Lights on Federal Roads. I find many dark and dangerous areas on the CSR route, especially the route from Gua Musang to Kuala Lipis. What are the Ministry's plans to ensure that risky areas can be fitted with street lights and also to ensure that the existing street lights on the route function and light up properly? I request that the Ministry continuously monitor this route. Mr Chairman, I would like to touch on Head P.27 Item 21000 – Constructing Grade-Separated Junctions. Every time there is a festive season or school holiday season, the Gua Musang – Kuala Krai road experiences extreme congestion. I would like to propose that the Ministry consider building an overpass at the Guchil Junction, Kuala Krai, and upgrading this road. Although we know that the Kota Bharu – Kuala Krai Highway and the CSR Kuala Krai – Gua Musang, and further to Simpang Pelangai, are under construction, the existing route, namely FT08 at Guchil towards Gua Musang and also to Bandar Kuala Krai, still requires improvement by building overpasses so that traffic congestion can be reduced and provide some comfort to road users. Building an overpass across the Guchil traffic light junction will enable a better road connectivity system in line with development and traffic density on this route. Mr Chairman, I refer to Head P.27 Item 31000 – Construction of Roads and Bridges. I would like to draw the Ministry's attention to a bridge that is a bottleneck on the main FT08 route, namely the Kuala Krai – Machang route near the Kuala Krai Meteorological Office. I propose that this bridge be widened and built higher in line with current developments and needs. Mr Chairman, the next item is Head P.27 Item 81000 – Construction of New Roads (New Projects). I would like to ask the Ministry about a road construction project linking Keruak in Hulu Besut – is the Honourable Besut here? Agree or not agree?

[Speaking without using the microphone]

Agreed, yes. To Lata Rek in Kuala Krai. I understand that the road construction project of 12 kilometres

was already put through the tender process some time ago, but it was cancelled. So, my question is, does the Ministry of Works have current plans to proceed with this project, which could shorten the journey from Kuala Krai to Terengganu and vice versa, namely for users from Besut and surrounding areas heading to Kuala Lumpur. The last item, Mr Chairman, is Head P.27 Item 08280 – Construction of Roads. I would like to draw the Ministry's attention to monitoring the implementation of the CSR Highway project currently under construction, to ensure it meets the standards of a highway. In my observation, when I use the CSR Highway, whether at Bentong or at Lipis, and also the Kota Bharu – Kuala Krai Highway, the road is very undulating and endangers users, compared with when we travel on the PLUS Highway, Karak and others. Therefore, my hope is that the packages currently under construction can be monitored properly by the Ministry so that they can be built according to the true standards, because once a project is completed, repairing it again so that it is no longer undulating requires additional costs and will certainly be more difficult to operate. Mr Chairman, I take this opportunity to convey greetings for the 216th Police Day. The police and the community are inseparable. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you. I invite the Honourable Lubok Antu.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Thank you, Mr Chairman, for giving me the space to take part in the committee-stage debate on Head B.27 and P.27 – Ministry of Works. I would like to touch on Item 82000 – Pan Borneo Highway, which involves a very large allocation under the Budget 2023, namely RM20 billion. Mr Chairman, with an allocation this large, I would like to ask the Ministry, what efforts is the Ministry making to improve connectivity between the main federal roads, especially the Pan Borneo Highway, and the rural roads in Sarawak? In this regard, I would like to ask the Ministry, is there a plan to build more grade-separated junctions (flyovers), with permission, along the alignment of the Pan Borneo Highway? Especially to facilitate access into the major towns located along the alignment of this highway, such as Pekan Lubok Antu and also Engkilili. The construction of this flyover is important because at present, to reach Pekan Lubok Antu and Engkilili, road users have to make a very large U-turn to enter the junction of the town. Besides that, Lubok Antu, which also has a district administrative centre, has the potential to be developed as an inland port, with permission, which can play an important role given the strategic location of Pekan Lubok Antu close to the Malaysia – Indonesia border. I am confident that building a flyover to enter Pekan Lubok Antu will certainly help greatly in facilitating the movement of road users, as well as smoothing logistics and cargo for trade and also security purposes. At the same time, I also hope the Ministry can look in detail at the need to improve the level of safety for pedestrians and motorcyclists along the alignment of the Pan Borneo Highway. For the information of Mr Chairman, it is common practice for public transport such as express buses in Sarawak to drop off passengers on the road shoulder if they wish to stop at small towns along the road between Bandar

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Kuching and Sibu. It is very dangerous for passengers of this bus to cross the Pan Borneo Highway, which carries many vehicles driven at high speed. Therefore, I would like to ask: will the government build footbridges for pedestrians and motorcyclists at strategic locations along the Pan Borneo Highway alignment? This is very important to enable...

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Honourable Lubok Antu. May I interject briefly?

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Don't take too long, okay.

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Thank you, Honourable Lubok Antu, my friend. Just now I heard the Honourable Lubok Antu say that flyovers should be increased in the state of Sarawak, and I strongly agree because this is very necessary. However, at the same time, does the Honourable Lubok Antu agree that we also need many R&R or rest areas for road users travelling such long distances? If we look from Telok Melano to the Sabah border, right now from Teluk Melano to Bau, there is not even one R&R. So, I feel this matter is very necessary. As for the Puncak Borneo area, there is a roundabout at Mile 13, Jalan Kuching-Serian, which is very dangerous. Accidents happen every day, and I have already raised this matter, where I proposed that this roundabout be converted into a P-Turn because it is very dangerous. And for the Kampung Lintang Baru area, when they want to make a U-turn, they have to go far, three, four to five kilometres. So, does the Honourable Lubok Antu agree to refine this matter for the benefit of our people in Sarawak?

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

I agree with the findings of the Honourable Puncak Borneo and request that they be included in my speech. I shall continue with my speech. Specifically, Mr Chairman, I would also like to suggest that the ministry build a footbridge for pedestrians and motorcyclists near SMK Engkilili, as this school is located beside the Pan Borneo Highway. This is very important to ensure the safety of teachers, students and parents who have to cross the Pan Borneo road every day to get to SMK Engkilili. Finally, I would also like to raise Item 09280 – Construction of Roads under the sub-heading Roads and Bridges Sarawak. I would like to obtain details from the ministry regarding the allocation of RM220 million. Will this allocation also be used to maintain the existing federal roads in Sarawak, including the old road between Kuching city and Sibu? This is because, although the Pan Borneo Highway has been built, the old Kuching–Sibu road is still used by longhouse residents along this road for their movement in and out of their villages and to the town. Therefore, does the responsibility for maintaining the old Kuching–Sibu road, which is an old federal road, still lie with the ministry? I hope the ministry can study the details that I have raised and carry out the construction and upgrading work of roads in Sarawak, also taking into account the safety and comfort of users. Thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Parit Buntar.

Assalamualaikum warahmatullahi wabarakatuh, peace be upon you. Thank you, Mr Chairman. I would like to refer to Head B.27, Item 040100 – Road Facilities Maintenance Branch.

Based on several public complaints and grievances from local contractors, I request that the government review the allocation of road upgrading and maintenance work and channel it back to the state Public Works Department (JKR), to be implemented by the district JKR, because it is better and gives local contractors an opportunity. Meanwhile, the concessionaires appointed by the government only focus on routine work according to the scope of work given. It can also help boost the economy of local residents and employment opportunities, where contractors who carry out work by quotation offered by the district JKR are local contractors comprising local residents, and hardware is also bought at local shops. Cost savings can be achieved because the cost of local contractors is much lower than the cost implemented by the concessionaires. This is because local contractors must quote prices and compete to obtain the work offered, compared to the appointed concessionaires who apply the rates stipulated in the contract document. With cost savings, many public complaints can be resolved by planning more work from the surplus allocation saved. I also propose that any concessionaire that does not carry out work well have its contract terminated and that the opportunity be given to other concessionaires. Next, Item 61000 – Road Upgrading and Item 71000 – Beautification and Rehabilitation of Roads. I suggest that the government upgrade and widen the junction entering Jalan Perusahaan, Parit Buntar, Kerian district, because it provides convenience to users and heavy vehicles to enter and exit and transact in the town centre and industrial areas.

Tuan Muhammad Fawwaz bin Mohamad JanPAS · PNPermatang PauhEN

Honourable Parit Buntar.

Second, the government also upgrade and resurface the access road to the town centre at Jalan Perusahaan FT.3149 in front of Petronas Parit Buntar, Kerian district, because it also provides convenience and safety to road users who want to go to the town centre and industrial areas. Third, upgrade Jalan Ipoh – Butterworth FT.001 from the Parit Buntar four-way junction to Sungai Bogak, Kerian district, because the area has uneven and damaged road surfaces.

Tuan Muhammad Fawwaz bin Mohamad JanPAS · PNPermatang PauhEN

Honourable Parit Buntar.

Okey, silakan.

Mohon laluan.

Tuan Muhammad Fawwaz bin Mohamad JanPAS · PNPermatang PauhEN

Alright, thank you, Honourable Parit Buntar. Thank you, Mr Chairman. Since mention has been made of road and highway upgrading, I would also like to request that the ministry pay attention to road and highway issues, particularly in the area of Permatang Pauh, because the Permatang Pauh Parliament is a centre for several Parliaments around it, even if residents from the north heading south, including to Parit Buntar, will pass through the Permatang Pauh area. So, the congestion on the highway in Permatang Pauh and also on the roads around Permatang which serve as access to the neighbouring Parliaments such as Parliament of Bagan, Parliament of Tasek Gelugor, Parliament of Kulim, Parliament of Bukit Mertajam, including what was mentioned by the Honourable Sungai Petani just now. Some Penang residents live in Sungai Petani because house prices are cheaper. However, they come to Penang to work, and they will also get stuck in Permatang Pauh.

Tuan Muhammad Fawwaz bin Mohamad JanPAS · PNPermatang PauhEN

Therefore, I request the ministry to provide a response on short-term and long-term planning related to this issue. Thank you, Mr Chairman, thank you, Honourable Parit Buntar.

Thank you, Honourable Permatang Pauh, and include part of my speech. Third, to upgrade the concrete drain in Pekan Kuala Kurau, Jalan Bagan Serai. Kuala Kurau FT075, Kuala Kurau, Perak so that it will improve the drainage system and can widen the road shoulder and reduce traffic congestion in the Pekan Kuala Kurau area. Also under Item 61000 – Road Upgrading, the highway often experiences congestion, especially during festive seasons and weekends. Road users have the option of using the Federal Road by exiting onto village roads. However, congestion also occurs because they share the road with village folk. The problem is that village residents are also affected if they have needs and emergencies, because they share the road with users who exit the highway to avoid congestion on the highway. Therefore, I suggest that the alternative road for road users be upgraded from two lanes to four lanes. Thank you.

Mr ChairmanEN

Alright, thank you. I invite the Honourable Tawau.

Tuan Lo Su FuiPBS · GRSTawauEN

Thank you, Mr Chairman. Item 050700 – Maintenance and Street Light and Traffic Light Bills of Federal Roads. When can the ministry provide a budget to maintain the street lighting problem, where most lights do not function on the Federal Roads in the Tawau district and Sabah? Mr Chairman, I ask the Minister of Works (KKR) again: why did the ministry take over the street light maintenance work in Tawau from the Tawau Municipal Council (MPT) when you still do not have an additional budget? Since the JKR took over light maintenance three years ago, for these three years most roads in Tawau and Sabah have been in darkness. If there is no budget yet, why not use the emergency fund, with permission, to resolve this issue? We are not asking to change street lights to LED lights like in KL, but we only ask that the KKR ensure these lights are working and bright. I have asked this question once already, but it has not been answered. I ask that this question be answered and hope this issue is resolved quickly. Mr Chairman, Item 08260 – Upgrading and Rehabilitation of Roads and Item 08280 – Construction of Roads. Almost every year there is an allocation for this, but the roads in Tawau and Sabah are not getting better, in fact they are getting worse. Like on the moon, as Sabahans say, because there are many potholes, the surface is like the surface of the moon. I ask the KKR to intensify monitoring of the quality of road maintenance work in Tawau and Sabah by following the agreed performance standard (APS), with permission, that has been set. If there is any misappropriation in the maintenance process, it must be reported to the SPRM. Imagine now, it is like we enter a room with no light at all and the floor is full of holes. Of course we will collide, and at worst, we will be injured. That is the situation of federal roads in Tawau and Sabah now. Many people have contacted and met me, sharing with me stories of accidents due to dark roads and the terrible condition of roads in Tawau and Sabah.

Tuan Lo Su FuiPBS · GRSTawauEN

Mr Chairman, I, as the people's representative of Tawau, stand here demanding justice. Who must be held responsible for the victims of accidents who have lost their hands,

Tuan Lo Su FuiPBS · GRSTawauEN

lost their legs, and the head of the family who has died due to these dark and potholed roads? KKR, please answer my question. Mr Chairman, Item 82000 – Pan Borneo Highway. My question is, what is the status of the Pan Borneo Highway – Kalabakan – Serudong – Simanggaris Project? What is the percentage of progress in implementing this project? When can I travel this road from Tawau to Kalimantan? The 39-kilometre highway from Kalabakan to Serudong, which connects Simanggaris–Kalimantan, needs to be implemented immediately to connect nearly 30 million population covering the Sabah region, the Sarawak region, the Brunei region and the Kalimantan region, Indonesia. Mr Chairman, this highway can generate the socio-economy of the people of Tawau, Sabah, and reduce the disparity in income distribution among Malaya, Sabah and Sarawak. Thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Padang Terap.

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

Thank you to Mr Chairman for giving me the opportunity to debate the Supply Bill 2023 at the Committee stage for the Ministry of Works. First, I take this opportunity to wish everyone a Happy Celebration of the 216th Police Day today. Next, Mr Chairman, I move on to Item 020100 – Policy and Development. My question is, what methods and standards have been set by the ministry in ensuring effective national planning and development and monitoring the privatisation programme of maintenance so that it meets the agreed specifications? Within the same item, what initiatives have been taken by the ministry to address the issue of rising building material costs in our country? If we look at the report from Berita Harian on 20 February, the Minister stated that the sudden rise in building material prices caused three per cent or 25 projects by the Public Works Department (JKR) to become ill across Peninsular Malaysia. So, what are the initiatives of the ministry to address the issue of rising building material prices to ensure that projects under the ministry are not delayed or experience problems? In the same item, what solution measures have been taken by the ministry in addressing the problem of delays and failures in completing infrastructure construction projects such as roads and basic infrastructure development by private contractors? Then, Mr Chairman, I go to Item 040300 – Slope Engineering Branch. My question is, how many slopes are classified as high risk and vulnerable to collapse, especially in the uncertain weather and climate conditions in Malaysia? What action has the ministry taken to address this problem? What standards have been set by the ministry as guidelines for slope maintenance to achieve the best prevention methods in slope engineering? Next, I would like to touch on Item 040100 – Road Facilities Maintenance Branch. What preparations have been carried out by the ministry to face the uncertainty of flood seasons and bad weather in ensuring the road network in Malaysia is in good condition and able to function for those involved in any natural disaster? Next, Item 61000 – Road Upgrading, which touches on my district, Padang Terap. In Padang Terap, a rubber industrial park is about to be developed. A world-class rubber factory is being built, referred to as Bandaraya Getah Kedah or Kedah Rubber City. It is one of the game changer projects implemented by the Northern Corridor Implementation Authority (NCIA) in cooperation with

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

the state government, which will open up large employment opportunities for local residents and elevate Padang Terap as a high-technology rubber industrial city and uplift the economy of smallholders. Land works and internal basic infrastructure development for Kedah Rubber City Phase 1, covering an area of 496 acres, have already been completed. Among the main infrastructure requirements supporting the Kedah Rubber City project is the road upgraded from Pokok Sena to Kedah Rubber City. Therefore, I would like to raise the question of how much attention the ministry has given to the application to upgrade the road from Jambatan Sungai Durian, Pokok Sena to Kedah Rubber City, located in Padang Terap, or more specifically Federal Road FT175, where this project involves Federal Road FT174 for 21 kilometres and State Road K11 for 14 kilometres, and according to the application made, the cost involved is RM658 million, which also involves the upgrading of bridges. The five bridges in this FT175 project are Jambatan Pokok Machang, Kuala Nerang, Bukit Kepah, Kampung Tanjong and Sungai Sari. So, I ask the ministry to provide information on the latest process or application to upgrade Federal Road FT175. Thank you, Mr Chairman.

Mr ChairmanEN

Alright. Thank you. I invite the Honourable Bakri.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Mr Chairman. Mr Chairman, I would like to refer to Item 41000 – Road Feasibility Studies, which is allocated RM5 million. Mr Chairman, recently the Most Honourable Prime Minister announced that there is consideration to review the monopoly by Touch 'n Go. I very much welcome this announcement because I see that among the causes of traffic congestion on the highway, especially on the North-South Highway, is the long queue in front of tolls where we have to spend a long time waiting for payment, and sometimes there are defects or equipment faults that occur. That is among the reasons why the queue is long. Mr Chairman, in the past, if we travelled from Muar to Kuala Lumpur, it only took about two hours. Now, two hours does not get us there, and sometimes it takes more than four hours for us to reach Kuala Lumpur. We do not know what causes such severe congestion that is unpredictable. All of this means we cannot plan our journeys. So, I see that the North-South Highway Project was built supposedly to ease traffic and speed up travel. Now, I see this project is not achieving its objective. I have not reached the point of saying this has failed, but it is clear we need to do something to make improvements. Mr Chairman, I do not like to take Singapore as an example, and I often say I am confident we can do better than Singapore. Singapore should not be a standard for us. However, sometimes I feel sad when I enter Singapore using their highways, there is no problem because to pay these toll charges and cause traffic congestion, the money still has to be paid.

Tuan Tan Hong PinDAP · PHBakriEN

The Singapore government is still able to collect toll money from road users. That means, a project announced by the Honourable Petrajaya last year concerning the directive from the Malaysian Highway Authority to highway concessionaires to implement a non-stop toll collection system, better known as multi-lane free flow (MLFF). I see this as the right direction and it should have been implemented much earlier.

Honourable Bakri.

Tuan Tan Hong PinDAP · PHBakriEN

Only a little time left. I ask the ministry to explain how far the preparation or implementation of this MLFF has progressed, so that we can ensure traffic on our highways will flow smoothly without any queues caused solely by having to pay tolls.

Honourable Bakri, before you sit down, please give way. Mr Chairman, this matter of traffic jams is very important, Mr Chairman. Now the stress level of road users is getting higher, Mr Chairman. Not for any other reason, because of traffic jams. It is not only Kuala Lumpur, but also highways, as Honourable Bakri mentioned. Among the factors, Mr Chairman, is the matter of tolls. I want to ask the Honourable Deputy Minister, how many years have we given concessions for these tolls? Surely the concept of toll collection is still the same, still using those old barriers. Up and down, up and down. "Why don't you use the sensor?", said Honourable Bakri. I also agree that sometimes in developed countries they use sensors. No need to do anything, use sensors, the car passes, then the [Inaudible]. That is one. Then, we have RFID, we have TnG, what else do we have, Honourable Bakri? What else do we have? We have all sorts of things. Then, RFID uses RFID lanes. Touch 'n Go uses Touch 'n Go. Then also SmartTAG uses SmartTAG. SmartTAG has more lanes than RFID. We want to buy SmartTAG, but it is not available in the market. What we have are all broken-down, Mr Chairman. None of them can be used. I want to ask the Honourable Deputy Minister, how long have we been giving concessions with no improvement? That is what has caused mental disorder among the Malaysian people. [Laughter] Mr Chairman, this is a fact. Tolls go up. After that, you cannot sell your toll card. When an RFID gets stuck, it goes gostan. Stuck, gostan. You cannot go to another lane. Why don't you use a bit, use your brain? One SmartTAG lane can enter, RFID can enter. After that, remove those old barriers. Cars hit them then you issue summonses. I think it makes sense, Mr Chairman. The people pay, then you squeeze the people even more, it is not fair, Mr Chairman. Thank you, Honourable Bakri. I think Honourable Bakri agrees with me.

Mr ChairmanEN

So, mental disorder, is it? [Laughter] Please, Honourable Bakri.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you to Honourable Jelebu. I ask that what Honourable Jelebu just said be included as part of my speech. Mr Chairman, what Honourable Jelebu mentioned just now is indeed true. In fact, it seems there is an improvement with RFID. I had forgotten that day, there was a Honourable Member who said this RFID stands for "Reverse-Forward- InsyaAllah-Detected". [Laughter] I have a similar experience where the purpose of installing this RFID was to make things faster. But it became even slower, and if we look at the car in front of us, if it waits there for more than three seconds, we know this is going to be a long wait. I hope this matter can be studied. Now we are in the information technology era. I hope this matter, if – Once again, sad. Singapore was able to solve this or use its technology as early as 30 years ago, surely we are still having to use these old barriers until today. That is all, thank you.

Mr ChairmanEN

Thank you. I invite Honourable Kemaman.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you, Mr Chairman, for giving me the opportunity to take part in the debate at the Committee stage, Ministry of Works. Mr Chairman, I proceed to Item 61000 - Road Upgrading, allocated RM1,549,405,000 for Peninsular Malaysia. Therefore, I request that the access road into DITC, Kijal, Kemaman be upgraded. For information, the application has already been notified to the Road Branch, JKR Kuala Lumpur, which is included in the RMKe-12 Federal Road Junction Upgrading Programme. For the knowledge of the Honourable Minister, this application has been made since 2021 with an estimated cost of RM1.3 million because it involves land acquisition and utility relocation. So far, the application is at the approval stage of the Central agency. Accordingly, I request that the ministry expedite the upgrading of the access into DITC. Mr Chairman, next I refer to Item 71000 - Improvement and Repair of Roads. In Kemaman Parliamentary constituency, there is road damage that needs attention from the ministry, namely Jalan Bukit Sagu, Kuantan to Cerul, Ayer Puteh, Kemaman. For the information of the Honourable Minister, the Public Works Department (JKR) Kemaman district has already made this application since 2021 by requesting allocation for maintenance programme for FT2687-14 kilometres, and the following year, the application was again approved for the 2022 allocation. Next, this year the application has been made, I understand, and included in the APJ road maintenance estimate using the CIPR method at a cost of RM1.4 million. Therefore, I would like to request that this damaged road be repaired promptly to ensure the public can travel on the road perfectly, insya-Allah.

Honourable Kemaman, briefly.

Tuan Che Alias bin HamidPAS · PNKemaman

Tuan Pengerusi...

Yang Berhormat

Mr Chairman. Thank you, Honourable Kemaman. I want to ask Honourable Kemaman, because Bukit Sagu is in my area, Paya Besar Parliamentary constituency. Does Honourable Kemaman agree that the Ministry of Works must speed up before the Hari Raya festival, because this road is a high-traffic road, with respect, among those returning from Kuala Lumpur heading to your area through my constituency. Thank you, Honourable.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Thank you, Honourable Paya Besar. I ask that this be included in my speech and answered by the Honourable Minister. Mr Chairman, referring to Item 21000 - Construction of Grade-Separated Interchanges. I propose that the ministry build a grade-separated road from Jambatan Geliga to Jambatan Bukit Kuang, Kemaman, which is the FT03 route from Kuantan to Kuala Terengganu within Kemaman district, urgently because it is a necessity. It is a major need for the people, especially during festive seasons and peak hours. Next, Mr Chairman...

Honourable Kemaman. Can you? Just briefly, Honourable Kemaman. I am speaking about many JKR matters today, Mr Chairman, indeed I have many things to say. Does Honourable Kemaman agree or not...

Tuan Che Alias bin HamidPAS · PNKemaman

Ya.

...People of Kemaman, people of Kuala Krau, people of Paya Besar, people of Terengganu, people of Kelantan, among the problems that increase the mental disorder of the people of the East Coast is traffic jams when returning to Kuala Lumpur, especially for Members of Parliament.

Tuan Che Alias bin HamidPAS · PNKemaman

Ya, ya.

Does Honourable Kemaman agree or not? Let me ask first.

Tuan Che Alias bin HamidPAS · PNKemaman

Amat setuju.

If you agree, I want to ask the ministry and the government, surely there has been no thought of an alternative; an alternative route to disperse traffic from taking the same route, use other areas. As the Member of Parliament for Jelebu, Honourable Kemaman, I have asked for a long time already, build a Jelebu alternate route. Pass through Jelebu, I open the Jelebu road for people of the East Coast. Does Honourable Kemaman agree or not? If you agree, I thank you.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Agreed. Next, Mr Chairman, the last one, under Item 31000 - Road and Bridge Construction. I wish to put forward a request that the ministry as soon as possible establish readiness for a heavy vehicle corridor within Kemaman district.

Tuan Che Alias bin HamidPAS · PNKemamanEN

For the information of the House and the ministry, there are many investors entering Kemaman district at present, especially in the Teluk Kalong industrial area. Therefore, it is a necessity to build a road for heavy vehicle routes for various industries, because it is not only to facilitate the entry of outside investors, it will also ensure the safety of local residents. That is all, thank you.

Mr ChairmanEN

Thank you. Now we hear from Honourable Jelebu. Please proceed.

Mr Chairman, before I continue, I wish to extend to the police personnel of the Jelebu Parliamentary constituency, Happy 216th Police Day. Jelebu police support me strongly, and of course the police personnel across the country. Congratulations to the Deputy Minister of Works for winning yesterday. Although we are now apart, the struggle remains the same. Mr Chairman, before I continue my debate on this, Mr Chairman, I want to talk about the traffic jam just now, Mr Chairman. I want to propose three things to the government. First, set up a road traffic congestion committee. A task force committee for road traffic congestion across the whole country, especially for the Kuala Lumpur Federal Territory. This is not something to take lightly, Mr Chairman, because this can cause other communicable illnesses. Mental disorder, insanity, dizziness, stress, all of which will eventually harm our people. Second, I want to ask the government, as I mentioned earlier, a multi-lane fast track. That means using existing lanes or expanding them to

speed up the dispersal of traffic that is stuck at all toll plazas. Mr Chairman, where do you live in Kuala Lumpur? I want to ask you, Mr Chairman, where do you live?

Mr ChairmanEN

Living in Setapak.

If Mr Chairman – fortunately Mr Chairman has outriders, try without outriders. From leaving Setapak to reaching Parliament alone, how many hours is it, Mr Chairman?

Mr Chairman

Satu jam.

What is the cause? The cause is bottlenecks. What is the cause? Tolls. So I think Mr Chairman agrees with me that the government should once and for all take action to set up a committee before our people's mental disorders increase, our doctors increase, and the Ministry of Health will increase.

Honourable Jelebu, briefly, Honourable Jelebu.

I will speak more clearly in the future.

Boleh?

Briefly. 10 minutes.

10 minutes? [Laughter] Mr Speaker, Honourable Jelebu has raised matters relating to traffic congestion. I agree, because mental disorder is a very important matter for us to tackle. This is because in my area, five years ago there was no congestion at the Panching junction. Today, Mr Speaker, Honourable Jelebu, it has involved nearly 10 kilometres during peak hours, at midday, in the morning. So I want to ask Honourable, do you agree that junctions that require grade-separated interchanges must be implemented immediately. Thank you.

Agreed, put it in my text. Mr Chairman, I move on to Item 61000 – Road Upgrading. I see, Mr Chairman, this ministry is allocated RM1.5 billion to be used to solve road problems in the relevant areas. I also want to mention this afternoon that I want to ask the ministry about FELDA Pasoh 1 and Pasoh 4 within Jelebu, FT 1281, section 1. That road is damaged, Mr Chairman. It has collapsed and is disrupting, and may cause loss of life to those involved in accidents due to this damage. This is a road, Mr Chairman, under the concession company Selia Selenggara Sdn. Bhd. This is what I mentioned earlier. Surely a road that has collapsed must still be studied? Wait, first the ministry wants to conduct a study first, want to do – what is this ground, a soil test. Surely they still need to do a soil test when the road has already collapsed, Honourable. I want to ask, I asked JKR Jelebu, JKR Jelebu is good. They gave a quick response, we will do it, look for one-off allocation to solve this problem. Until when? Until now it has not been resolved. So, I want to ask that this concession company please act quickly and look into it. I want to inform the Minister's side. I have sent letters, I think more than six times. Replace the bridge at one bridge in my Parliamentary constituency, Mr Chairman, the Kampung Petaseh and Pertang bridge. This bridge causes flooding every year, three times a year, whenever it rains there is flooding because this bridge is small, its culvert is small, everything gets stuck. Replacing this bridge costs only RM3.5 million, Mr Chairman. For several years I have asked and it has not been resolved. Do you know, Mr Chairman, how many tens of thousands of losses the villagers suffer that the government cannot cover

because of this bridge alone? Take out RM3.5 million from this RM1.8 billion for Jelebu, Minister. So at least we solve the villagers' problems. Then, Mr Chairman, I go to the main roads in the Jelebu Parliamentary constituency, Jalan MARDI, Jelebu to FELDA Lakai, Jalan Simpang Durian-Juntai. These are all areas that cause accidents that can lead to death, why? Because of the road. So, for that reason I propose to the ministry that we must have a forensic study of any roads we identify that can cause accidents leading to death. If possible we solve them...

Briefly, Honourable Jelebu.

...one by one, Mr Chairman. I think the Unity Government is a government that will be supported by urban and rural communities for quite a long time, Mr Speaker.

Honourable Jelebu, briefly.

Sedikit, sedikit.

Mr ChairmanEN

Time is up.

Mr Chairman, Honourable Jelebu raised this because damaged roads cause deaths and disabilities. Does Honourable Jelebu agree that compensation for the disabilities and deaths must be paid by the government?

Mr Chairman, many people die in accidents due to road factors. When they die, Mr Chairman, assistance cannot be claimed from insurance. They look for fault, what fault is insurance looking for, Mr Chairman? They say the car had changed sport rims. After that, the car had no tyre tread, to avoid paying compensation, even though if we look at common sense, the mistake is due to road damage. So for that reason, Mr Chairman, I think we must do something. We have JKR in every district, and Mr Chairman, I think JKR can submit the factors that can cause damage and also cause loss of life so that they can be solved one by one. Mr Chairman, can I continue a little more? One more matter, Mr Chairman, concerns street lighting. In several areas there are now solar LED lights that use solar power, and some dark areas have solar installed, and the areas where solar is installed may be trial and error, Mr Chairman. So, there are some areas still dark that the ministry should pay attention to, because this is also one of the factors causing accidents. Lastly, Mr Chairman, I want to move to B.27, Item 040600 – JKR Federal Territory Kuala Lumpur. Why do I often mention Kuala Lumpur, Mr Chairman? Apart from my experience of being given the opportunity as Deputy Minister of Federal Territories some time ago, I also live in Kuala Lumpur, including Mr Chairman and so on. The ministry allocated RM25 million to JKR Kuala Lumpur, Putrajaya and Labuan, which was split. Putrajaya RM10 million, Labuan received RM9 million, but Kuala Lumpur and Putrajaya are the capital cities of Malaysia, Mr Chairman. Most of the damaged roads are not because of anyone's mistake but because of our utility mistakes. TNB digs up roads, SYABAS digs up roads, Telekom digs up roads, then patches them afterwards

not according to specification. This gives a bad image. Made into a SUKE highway. Is it SUKE or what, that new highway, the top is already finished but the bottom has not been completed. So all this can cause anxiety and make the face-lift of Kuala Lumpur City worse, even though we spend millions and even billions of ringgit every year. So, I want to ask the enforcement unit or the ministry to be firmer with these utility companies and contractors to rehabilitate and repair again all the damage they have caused. Thank you, Mr Chairman. I once again say thank you.

Mr ChairmanEN

Okay, thank you. I invite Honourable Kuala Krau.

Tuan Kamal bin AshaariPAS · PNKuala KrauEN

Assalamualaikum warahmatullahi wabarakatuh. Mr Chairman, thank you for this opportunity. Like the other Honourable Members, I also take this opportunity to wish Happy 216th Police Day. Thank you to the District Police Chief of Temerloh who kindly invited me, the MP for Temerloh, as well as the ADUN Semantan, Lanchang and Mentakab, so this is what is called police and society are inseparable, police and people's representatives are inseparable.

Tuan Kamal bin AshaariPAS · PNKuala KrauEN

I now move to P.27, Item 02800 – Repairing, Replacing and Upgrading Roads and Bridges, allocated RM137.7 million. I want to draw attention to the main road from Temerloh to Jerantut, where there is a village called Kampung Seboi. There is a small bridge there, small compared to the road, which has caused many accidents, not only ordinary accidents but fatal ones. Throughout my time as people's representative, several fatal accidents have occurred there. The second is Item 71000 – Beautifying and Rehabilitating Roads. The main Temerloh–Jerantut road is also near Kampung Peragap, where subsidence has occurred even though it was only recently repaired. This week, subsidence has occurred and caused danger, especially to vehicles, because that route is the only main route between Jerantut and Temerloh and between Temerloh and Jerantut. Item 61000 – Upgrading of Roads. One thing I want to mention, and draw the ministry's attention to, is the road that was tabled in the RMKe-12 by the Public Works Department (JKR) Maran, namely the road between TNB Bandar Jengka and Jengka Lapan. I see that upgrading this road is something that needs to be looked at as a priority because, firstly, it is used by heavy vehicles, and coincidentally there is a madrasah there, referred to as pra tahfiz, which also poses a danger to parents who send their children to study there. Likewise the road between Rumpun Makmur and the town centre. In the previous debate, I called for the Federal Government and the state government to cooperate closely to look at both roads, because the public does not know whether this is a state road or a federal road. However, the consequence borne is that the public has to face these roads while the ministries at Federal and state level pass the responsibility back and forth. Finally, that passing of responsibility is not merely troublesome but has led to the loss of local lives. Mr Chairman, next I take P.27, Item 19000 – Engineering Research and Development. Here I seek clarification from the ministry: does this research also include looking again at the design of JKR road construction, which we see increasingly easily damaged today and producing potholes that can take lives, especially motorcyclists, as mentioned by many other Honourable Members? So, I request a written breakdown of what will be researched, apart from what was mentioned just now.

Tuan Kamal bin AshaariPAS · PNKuala KrauEN

Lastly, I hope there will be no directive from any ministry at the centre not to recognise the involvement of MPs or Honourable Members from the opposition in working with the existing ministries at state or Federal level, because we are representatives who bring the people's problems and want to resolve them together with the Madani Government to solve the people's problems. That is all, Mr Chairman, thank you.

Mr ChairmanEN

Thank you. I invite the Honourable Sandakan.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Chairman. I, Sandakan, go straight to Item 82000 – Pan Borneo Highway, involving RM2 billion. Of the RM2 billion allocation, may I ask, how much is for the Sabah segment of Pan Borneo? Which work packages are included under this allocation? Also, Work Package 28-30 from Batu 32 to Telupid, what is the current progress and what is the estimated completion date? Next, Package 27A, Libaran Bypass Highway, what has happened to this section since work stopped almost five years ago? Recently there was also an accident involving five cars at Batu 30, Federal Route 22, which caused massive congestion for more than six hours. This has shown how important the Libaran Bypass is as an alternative route. So, we seek clarification from the ministry. I move on to Item 08260 – Upgrading and Rehabilitating Roads and Item 08280 – Construction of Roads. Mr Chairman, I would like to ask, can the ministry provide a detailed breakdown of all roads to be maintained? It is very important for JKR to obtain the views of Members of Parliament as well as state assemblymen and community leaders, because we know the problems faced by the people and the roads that often have problems needing attention. It will also save time for people's representatives in this august House in resolving these problematic and dangerous roads, so that we do not have to repeat ourselves over and over. So, is this allocation included in the design study for the flyovers at the busy Helang Roundabout and Buaya Roundabout at Batu 7, Sandakan? I have also raised the issue of traffic congestion at these roundabouts, which causes serious road accidents. The answer given by the ministry was that JKR Sabah never submitted any proposal or application, and the answer I received from JKR Sabah was that there is no allocation from the Federal Government. So, I hope the new Unity Government can work more closely together to solve the people's problems. Now, I want to go straight to Item 050700 – Maintenance and Bills of Federal Road Lamps and Traffic Signal Lamps, which uses RM49 million. So, how much of this budget will be allocated to the state of Sabah? Can the ministry also explain the procedure for applying for this budget for maintenance work? Does this allocation include work to repair lamp posts that have been hit in accidents? This is because there are many cases in Sandakan where, after being hit by cars in accidents, lamp posts are simply left there. For several months, no one comes to carry out maintenance work. So, who will the ministry use to carry out maintenance work? Is it through concessionaires, or carried out by JKR's own staff? Also, for Mr Chairman's information, we often receive reports that street lamps that have been repaired will break again after a week. So,

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

I ask the ministry to obtain a standard from the concessionaires, contractors or our staff, and to conduct a study into the causes of this damage, so that we can save budgets from the people's money and the government's money. So, I move to Item 08260 – Upgrading and Rehabilitating Roads and Item 08280 – Construction of Roads. So— oh, this one I've already covered. Sorry. So, I also want to move to Item 08230 – Construction of Bridges. So, out of RM23 million, how much will be used to build new bridges? Is there a budget for maintenance work on old bridges? So, through the Sabah Lorry Association, they have repeatedly raised this problem with me and other Members of Parliament regarding the standard of bridges that need upgrading, so that they can increase the loading capacity and reduce transport costs for the people of Sabah. So, I also want to ask the ministry whether it will upgrade the 25 bridges categorised by JKR Sabah as unsuitable for heavy vehicles. So, I ask and I hope the ministry can answer, or give a response to this motion. I move on to the last item, Item 08250 – Study on Slope Protection/Repair. So, may I obtain the SOP for getting approval to conduct a study? This is because in Sandakan there are several very dangerous slopes, such as at Taman Indah Jaya and Taman Grandview, Sandakan, which have not received any action from the ministry. When landslides occurred on the road from Bandar Sandakan to SM Sung Siew and at Taman Sentosa, which had been repaired, it took about six to 12 months to begin rehabilitation work, and it involved doubled costs because the landslide in that area became more serious. So, I hope the ministry can change the SOP, especially for cases involving emergencies like this. Thank you, Mr Chairman.

Mr ChairmanEN

Alright, I invite the last speaker, the Honourable Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera, Mr Chairman and Members of the House. Thank you for giving me the opportunity to speak during the Committee stage of the 2023 Budget. I take this opportunity to address the police. Happy Police Day for the 216th time, and especially to the police personnel in the Batu Pahat Parliamentary constituency. I want to touch on P.27 – Ministry of Works (KKR), with Item 4100 – Road Feasibility Study, Item 61000 – Upgrading of Roads, Item 60000 – Upgrading of Roadways and Routes, Item 02800 – Repairing, Replacing and Upgrading Roads and Bridges, Item 71000 – Beautifying and Rehabilitating Roads, and Item 8000 – Building New Roads. Under Item 4100 – Road Feasibility Study, it is found that the value for this item has increased from RM275,449 to RM5 million, an increase of 20 times. May the Honourable Minister inform this House of the focus or objective of this study? What methods will be used to carry out this study? Therefore, I ask for clarification as to whether it involves certain areas, and if it does, which areas are meant? Under Item 61000 – Upgrading of Roads. Indeed, many roads, whether Federal Roads or state roads, need to be upgraded. Some roads that were previously narrow now need to be widened due to the increase in vehicles. There are also dangerous roads, such as those with many bends, and added to that, the surroundings of these roads now have many residents nearby. So, roads like these really need to be upgraded for the comfort of road users. The increase in allocation from RM511 million in 2021 to

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

RM756 million in 2022, and now to RM1.54 billion, shows the government's concern about this problem. Therefore, firstly, I ask for an explanation. Name the priority roads that are given priority for upgrading? Secondly, which state will benefit? Thirdly, I ask the central agencies to please allocate about RM2 million to the JKR Batu Pahat district, to upgrade Jalan Tanjung Labuh, which is often flooded every time it rains. Apart from Item 61000, I also want to touch on Item 60000 – Upgrading of Roadways and Routes. Is this the same activity, namely upgrading, or is it otherwise? And also, does the meaning differ? Therefore, I request an explanation of this Item 60000. For Item 02800 – Repairing, Replacing and Upgrading Roads and Bridges. Under this item, there is still upgrading activity. Therefore, I ask that the definition of upgrading here be harmonised so that there is no overlap in expenditure. As for repairing or upgrading bridges, I would like to get an explanation from the Honourable Minister. Does this involve small bridges, such as two-lane or four-lane ones, or in which state will priority be given? There are three items that show a reduction in expenditure compared with 2022. These items are Item 60000 – Upgrading of Roadways and Routes, reduced from RM263 million to RM242 million; Item 71000 – Beautifying and Rehabilitating Roads, from RM30 million to RM24 million; and Item 80000 – Building New Roads, from RM68 million to RM10.5 million. Firstly, why did this reduction happen? Secondly, which state or district is affected by this? Therefore, Batu Pahat requests that this House be informed on the above matters. That is all, thank you.

Mr ChairmanEN

Alright, thank you. The Honourable Minister. 30 minutes, please.

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi taala wabarakatuh and salam sejahtera. Salam Madani. Thank you, Mr Chairman. Thank you to the Honourable Members who have raised several matters. On this occasion, I also wish to convey Happy Police Day for the 216th time, and on this occasion I will do my utmost to answer the issues raised under the purview of the Ministry of Works. We all know that the budget tabled earlier has several constraints that we have to face in the Ministry of Works. I thank the Honourable Members. Many have raised those matters, especially those who want to help the Ministry of Works so that these budgets can be increased, to help the Ministry of Works carry out its duties and responsibilities more effectively and ensure the development carried out so far. I would like to state that the overall allocation for the Ministry of Works is RM8.43 billion, an increase of 15 per cent compared with the RM7.306 billion received in 2022. The operating expenditure estimate alone, referred to under Item 27, involves approximately RM865.27 million for 2023, and also an increase of RM5.07 million compared with 2022.

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

For the information of the Honourable Members, the development expenditure allocation for P.27 for 2023 is RM7.573 billion, an increase of RM1.09 billion from RM6.83 billion in 2022. This ministry will certainly want to approve all allocations under that expenditure, under the 3rd Rolling Plan, where we have obtained approval for several new projects, especially building a new road from Habu to Tanah Rata, Cameron Highlands, Pahang. We are upgrading Jalan Tun Hamzah to Persimpangan Semabok – Lebuh AMJ in the Melaka Tengah district, improving highway network access to Pengerang through the construction of a bypass lane on the Senai – Desaru Expressway. Fourthly, upgrading the North-South Expressway from Yong Peng Utara to Utara Phase 1 Johor, from four lanes to six lanes, and fifthly, Pan Borneo Sabah and the Sabah Link Road. Under the purview of KKR, we study the debates of the Honourable Members, especially to understand the aspirations expressed by the Honourable Member. I myself am included in the category of Honourable Members. I am also – I try my best to ensure that Federal Roads under KKR's supervision can follow application procedures, including new roads or road maintenance. The list of these projects has gone through a screening process in the ministry, where they will be assessed and examined based on the main evaluation criteria in the planning of the Highway Network Development Plan, or HNDP, under the 2030 Plan. For project proposals not in the HNDP, they can still be applied for to be raised for consideration, and also under central agencies, if the project concerned becomes a priority at the evaluation stage in the Honourable Members' state. Accordingly, I call on the Honourable Member to bring the proposed project to the state government first, so that it can be considered at state level and obtain approval at ministry level. Honourable Members, Mr Chairman, allow me to also turn to the issue of maintenance, which was raised by a large number of Honourable Members in the debate just now. For the information of the Honourable Member, one of our core businesses, our priority, is that the Ministry of Works is responsible for the maintenance of Federal Roads throughout the country. For information, the total length of roads is 18,023.14 kilometres, of which the length of Peninsular Malaysia Federal Roads is 14,884.721 kilometres.

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

Meanwhile, the roads in the Federal Territory of Labuan, Sabah and Sarawak, totalling 3,138.426 kilometres, are maintained by concessionaires appointed by the government. Therefore, I would like to clarify that the concession companies appointed by the government are responsible for carrying out routine maintenance work, namely scope of work, pavement maintenance, road shoulders, grass cutting, road furniture, bridge washing, and also inspection of every drain, which becomes routine inspection at the time. So, for the Honourable Member's information, we will try our best if an emergency beyond expectation occurs. Our side will take into account, after landslide incidents, that we also prepare a Traffic Management Plan and provide temporary routes to enable vehicles to use the roads.

Tuan Pengerusi.

For the information of the Honourable Member, we also identify that the concessionaires of federal roads.

The Honourable Deputy Minister.

Mr ChairmanEN

The Honourable Rompin?

Rompin, Deputy Minister.

May I finish first? The Honourable Rompin was not involved in the debate just now.

Mr Chairman

Ya.

That's what I want to ask, Deputy Minister.

I'll finish first.

Yes, okay, thank you.

May I ask. There are actually a lot. I have half an hour. Mr Chairman, it should be given one hour. Later, you know, the Honourable Jelebu just now, with the situation of the atmosphere...

Mr ChairmanEN

Yes. Never mind lah. Mental disorder, is it? Carry on.

Yes, disorder. [Laughter] So, among those raised, we all know the actual lifespan of these roads is between five and seven years. It is also affected by several factors. If we look at it now, excess time, for example excess rain, can also cause the road to have a short lifespan. Mr Chairman, for this item we actually applied for approximately RM4.548 billion for maintenance works and were approved only RM1.40 billion. Our shortfall is two-thirds of our application. This is a very serious constraint on the Ministry of Works (KKR). I have listened to the debates just now. Therefore I thank the Honourable Member who raised it so that the Honourable Member for Pontian can hear, so that the Honourable Prime Minister from Tambun can listen to the speeches of Honourable Members. We thank you. Therefore I would like to answer the matters raised by Honourable Members just now. I want to move to the more important matters, namely several matters raised by the Honourable Member just now. The main point: I am most worried about what was raised by Honourable Members, especially the Honourable Member for Jelebu just now, namely the problem of mental disorder, which we are worried about, which we know the whole country will experience. I am worried that all our people will experience that problem, including in Parlimen Lipis. Parlimen Lipis is already experiencing traffic congestion now. It is not only Tuaran, not only Jelebu, not only Kuala Krai, not only Kota Bharu that have experienced road congestion, and this may be a sign of our country's very rapid progress, how remarkable it is now. So, I want to state that some of my main colleagues (not that I am not following the order, but I want to say) that what was raised by the Honourable Member for Bakri and also the Honourable Member for Jelebu, for example, was raised whether because of tolls, for example. Raised by my colleagues, many colleagues, Honourable Members just now, the problem of road traffic congestion. We want to spend approximately RM3.46 billion on implementing Multi-Lane Free Flow to avoid traffic congestion on highways, which was raised by our colleagues, Honourable Members just now. The total traffic or vehicles passing through toll plazas on the tolled highway network in Malaysia amounts to four to five million a day. Therefore, the government is committed...

Menteri.

In improving the quality of highway management.

Menteri.

Especially in terms of the toll collection system so that users do not need to queue at toll plazas to make toll payments. For the information of the Honourable Member too, in line with the government's plan towards a Non-Stop Toll Collection System, also known as Multi-Lane Fast Flow (MLFF). The government is endeavouring to ensure that this MLFF can be implemented, starting with the usage study in 2024, and we expect that in 2025, full usage can be implemented for use – avoiding the barrier that the Honourable Member said is so bad. This has been announced by the Honourable Prime Minister and has agreed for us to use MLFF, as well as other developed countries, in terms of collection management. Next, we want to launch traffic flow on highways, especially at toll plaza areas; the implementation of Multi-Lane Fast Flow (MLFF) is the future of tolling and traveling, in line with the Blueprint Intelligent Transport System of the Ministry of Works. For the information...

Menteri.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung Piai

[Bangun]

A little more. I will finish. I will give, I will give room. But I want to finish because I am afraid this answer will be cut off. So it cannot be understood by other Honourable Members. So it will make the mental disorder even worse in this answer. So, let us wait for the full answer first. For the information of the Honourable Member, it has a positive impact on the current congestion, which is increasingly worsening, especially at toll areas, and often overflows all the way to the main line. This is because users no longer need to stop or slow down their vehicles to pay tolls. Besides that, MLFF will also provide convenience and improve the user experience through fast and efficient toll transactions. So, Mr Chairman, there will be no more gates, just go straight, it shoots straight through. So we want to be the same as developed countries. This is what is called MLFF. So in this effort, we need about one and a half or two years. SST – LOI has been issued, a Letter of Intent issued to the concessionaires involved to ensure that the study can run smoothly. We want it to perhaps help by some percentage in terms of congestion on that highway. To eliminate it, it is certainly impossible with the increase we observe. If possible, we want to know, the Ministry of Transport (MOT) can know the monthly listing of vehicle production on the roads, which is very exciting for us. If we look at Selangor alone, if we look at Kuala Lumpur, in one month it exceeds three running numbers, more than three times, if in Kuala Lumpur and Selangor. This actually adds to the rapid growth of roads. So, I want to inform that it causes, in one payment platform, various options are provided, giving users the choice in selecting financial sources for toll payment purposes. As preparation for the introduction of MLFF, the Ministry of Works will introduce an Open Payment System on tolled highways in Malaysia in the near future, namely Sistem Tol Terbuka, which enables toll payment from a wider range of financial sources, such as credit cards, compared to only the Touch 'n Go card. So it means we use many Touch 'n Go cards and e-wallets at the moment.

[The Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) presided

Menteri.

Please, the Honourable Member for Jelebu.

I have examined the Minister's answer. However, I want to correct what I said earlier, Mr Chairman, that he said mental disorder; he did not say Jelebu, yes, so do not misunderstand. As a result of mental disorder among the people, on this matter, this toll. Minister, this Multi-Lane Fast Flow (MLFF). I see the answer of the Honourable Deputy Minister: 2024 is only just going to be sufficient – to complete the study. By 2024, our total traffic volume on the roads has already tripled from now, Honourable Minister.

We only propose to cooperate with the concessionaire companies – it does not involve structure. It involves only technology. Why don't you communicate, with permission, with the concessionaire to change our system from using the old barriers to using a radar system? Just now the Honourable Deputy Minister said he wants to diversify payments: use credit cards, use all sorts. Now it is already used, but the equipment for passing through the toll does not make sense now. TnG, TnG only. RFID, RFID only. Only what I suggested earlier, Honourable Minister, is that the RFID lane...

...can be passed by TnG. Multi-lane, Honourable Deputy Minister. So, I want to ask the Honourable Deputy Minister to please review this study. Do not take too long.

Okay, thank you, Honourable Member for Jelebu.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Deputy Minister. Just a little.

Honourable Deputy Minister, one more. Previously, when the Honourable Deputy Minister was not yet Deputy Minister of KKR, this is one of the things the Honourable Deputy Minister complained to me about when I was in Kuala Lumpur. [Laughter] This is what the Honourable Deputy Minister said to me. He said, "What kind of federal territories ministry is this, surely it can't even do that?" he said. Now I bring it up again, the Honourable Deputy Minister can change what the Honourable Deputy Minister answered at that time.

[Dewan riuh]

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Deputy Minister, just a little. Thank you, Honourable Deputy Minister.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Party elections, is it?

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Okay, it is true about the North-South Highway; I return to the constituency every week. Before, yes, five to ten years ago, it was very smooth. In the morning, heavy vehicles, lorries, sometimes enter any lane. Then, jammed. It is slow. Second, when returning in the evening, oh, terrible. It is really congested, jammed so badly that it takes five to six hours to reach Kuala Lumpur. I hope what the ministry proposed must be done quickly. Not study; if the study takes a year, I think that is the only issue. Both of those just now

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Honourable Deputy Minister, I cannot debate, but I want to bring up one matter in my constituency. I see that in Johor almost all districts have four-lane roads. Instead of roads that have been upgraded, but in Pontian, my road...

The Honourable Member for Tanjong Piai did not debate earlier.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

I cannot debate.

Want to raise a new issue.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Cannot debate. I just ask to give information, later help me.

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong KarangEN

Honourable Deputy Minister, I interject briefly.

So, I have a lot to answer, actually. This is a new debate, Mr Chairman.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Never mind, you give it in writing only. But I must raise it, Honourable Deputy Minister. If I don't raise it, later they will say I did not bring up this issue.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)

Yang Berhormat...

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong KarangEN

Tanjong Karang briefly, Honourable Deputy Minister.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung Piai

Sedikit sahaja.

The Honourable Member for Tanjong Karang also did not debate earlier.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)

Yang Berhormat...

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong KarangEN

Earlier someone mentioned Selangor.

If it is included in MLFF, I will answer.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

No way. Honourable Deputy Minister, we were given only two people to debate. We were not given the opportunity to debate.

Okay, I understand.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member for Tanjong Piai. This is the floor of the Honourable Deputy Minister, yes.

The Honourable Member for Jelebu has left.

Dato' Sri Dr. Wee Jeck SengMCA · BNTanjung Piai

[Ketawa]

He did not listen to our debate; he only raised it but did not want to listen. This is the problem of mental disorder.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Deputy Minister, wait. [Laughter]

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong KarangEN

Tanjong Karang, as a town, also experiences mental disorder.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, sit down a moment.

No, I always answer MLFF questions, because many questions were raised by colleagues.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Deputy Minister, wait. This is the brilliance of the Barisan Nasional Member of Parliament. Please.

Thank you, Mr Chairman. Therefore, I state that the cost involved in this MLFF is RM3.46 billion, not a small figure. Now it is March; surely we want to do it without a study? We must conduct a study. If not, it will become more obvious and we will replace everything we have today with new ones. Because this MLFF no longer has a pillar in the middle; it is only between road and road. That means, if today its usage can only be three or six lanes, it will become more. I cannot state how many lanes; later it will be disputed. This is because it is in the process of being drawn up by the party that will obtain this concession. We have already anticipated at the time, RM3.46 billion. All this is to avoid what we discussed. Everything, everything needs money. Money is not important, but money is for everything. So Honourable Members...

Honourable Deputy Minister, briefly.

...saya ingin...

The Honourable Deputy Minister mentioned the cost, RM3.46 billion, to build this fast lane. When it is implemented in 2024, will there be a toll increase later because of bearing this concession? I want to know in detail: how many years is this concession? Which company won it? How will the implementation in 2024 be? Thank you, Honourable Deputy Minister.

In detail, Honourable Member for Paya Besar, we will actually not involve a toll increase. However, for the long term, I will inform you about the concession agreement later. I do not want to answer wrongly in this Parliament, because actually there is no proposal yet on how long, how long this MLFF is. Mr Chairman, I would like to move slightly to colleagues who raised various matters. However, I see just now that overall many raised issues regarding road congestion due to tolls and so on. So, I want to raise several matters by my colleagues, especially the first debater, the Honourable Member for Rasah, who wanted to state about maintenance in Parlimen Rasah. For information, based on the question asked by the Honourable Member for Rasah, about Jalan Labu in the Parlimen Rasah area: in 2020 to 2022, we allocated a total of RM5.39 million for road maintenance works. For 2023, the ministry has allocated a total of RM2.56 million for periodic pavement maintenance and it is expected to be completed in October 2023. For the Honourable Member for Rasah's question regarding Jalan Labu, upgraded mainly from Plaza Tol Seremban: for the information of the Honourable Member, the agency has approved the proposed project to build the service road referred to, valued at a cost of RM600 million, which is included in this Rolling Plan 3. That means the Honourable Member for Rasah can announce in the area that approximately RM600 million has been approved to build a service road from Tol Baru Seremban to Lingkaran Tengah Seremban, Jalan Seremban-Labu FT362, Seremban district, Negeri Sembilan, in Rolling Plan 3. For the other matter stated by the Honourable Member for Rasah, namely phase 3 from the Labu interchange, Jalan Tun Dr. Ismail: for information, it has not yet been approved. It is placed in the guidelines so that it is included in Rolling Plan 4, which starts on

March until this April. We ask that the Honourable Member help us so that it becomes a priority in the state-level applications.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Honourable Deputy Minister. I think this evening I am among the happiest people in this House. Thank you, that is good news: RM600 million to build a new service road for Parlimen Rasah. I am very confident it will – if not 100 percent, at least reduce the congestion problem in areas that are always congested. Although the middle ring road for the next phase has not yet been passed, we will work on it together. Thank you. At least, this is good news for me to return to the constituency this evening to inform the people of Rasah that the Ministry of Works under the Madani Government is very caring. Thank you.

Thank you, Honourable Member for Rasah. Next...

Tuan Cha Kee ChinDAP · PHRasahEN

Congratulations also to the Honourable Deputy Minister, who won with high votes during the UMNO election for MKT. Congratulations.

Thank you, Honourable Member for Rasah. It was not a very big win; I only defeated the Honourable Member for Jelebu, he lost. [Laughter] He is not here; I dare say it to his face in here. If he were here just now, I would not say it. [Laughter] So, Honourable Member, Mr Chairman, I would like to turn to what was raised by the Honourable Member for Besut just now, where several matters raised by the Honourable Member for Besut and also several Honourable Members from Bentong and Pekan were the same matter, namely where he raised the widening of the highway between Karak and Tol Gombak, which has also been included in the plan this year. The ministry has carried out the Kajian Keperluan Alternatif Lebuh Raya Gombak – Bentong, Pahang, which was raised as constantly becoming congested, especially when the Central Spine Road, now with its new name Lingkaran Tengah Utama, is completed, which is expected to be in 2025. Therefore, we in the ministry have agreed to upgrade the KL-Karak highway from Tol Plaza Gombak to Plaza Tol Bentong, which will be implemented by the concession company. The implementation of this project is expected to take four years, and it will be completed together with the Lingkaran Tengah Utama route. The cost so far, because the cost of construction increases from time to time and is uncertain: we know now that PPRT houses can no longer be built at the old cost rate. Therefore, the cost has been increased from our original allocation of RM1.2 billion; it has now risen to RM2.1 billion, and the project will start in July 2023.

Terima kasih.

I saw earlier that the Honourable Member for Bentong was not in the House, but he heard Bentong mentioned and quickly came in. That means you can announce the widening of the Karak Highway all the way to Gombak, valued at RM2.1 billion, which was raised by several Honourable Members from Pantai Timur just now. The Honourable Member for Besut also raised the matter of the Federal Road in Parlimen Besut, namely from Jalan Kampung Tok Hah to Kampung Nangka. The issue is the frequency of damage. This location, for the information of the Honourable Member: Kampung Tok Hah to Kampung Nangka is on route FT189 Jalan Seberang Jerteh. In 2023, an allocation of RM855,000 has been approved for its repair under periodic maintenance under the concession – periodic pavement; the concession will carry it out, and it is also expected to be completed in October 2023.

For the upgrading of the road raised by the Honourable Member for Pekan. I do not know whether he is in the House or not? Oh, he is here. The Honourable Member for Pekan is here. Loyal to my Boss. [Laughter]. Upgrading of FT012. The central agency has approved the upgrading of road FT012, Jalan Kuantan-Segamat in Rompin district, phase 2. Preliminary works and design along 51 kilometres under RP3, the Twelfth Malaysia Plan, have been approved, and this project is valued at RM25 million. It was not in vain that the Honourable Member stood up to speak just now. As for the issue of the damaged Kuantan-Segamat road. Just a little more, Mr Chairman, I will finish for the Honourable Member for Pekan. The rest, I will answer in writing because my time is up. Honourable Members...

Don't forget Paya Besar.

Parit Buntar didn't answer either.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

The Honourable Minister, what about the Sabah issue?

Tuan Kamal bin AshaariPAS · PNKuala Krau

Kuala Krau.

I can answer all of them together, with the permission of Mr Chairman. This is because we have prepared, it is indeed quite thick. It can be answered but it depends on the permission of Mr Chairman.

Dr. Hajah Halimah AliPAS · PNKaparEN

Kapar wants one too.

So I would like to finish a little, Mr Chairman, on what was raised by the Honourable Member for Pekan...

Puan Vivian Wong Shir YeeDAP · PHSandakan

Sabah, Sandakan.

...Namely the allocation for the issue of the damaged Kuantan-Segamat road. We have taken the issue of damaged roads seriously. Therefore, in 2023, we allocated as much as RM390,000 under periodic maintenance, pavement which we will implement, expected to be completed this year, in the repair programme. The Honourable Member for Pekan also raised the Sultan Abu Bakar Bridge, which is 53 years old, and the formation of small islands. We suggest that the Honourable Member request that it become a priority in the Fourth Rolling Plan, which I said begins in March until April. Up to today, it is still not on the priority list. The Honourable Member should apply to the state government for it to be made a priority. I listened to the debate just now, which was quite critical, as the small islands could be washed away and could affect the Sultan Abu Bakar Bridge. So I ask that the Honourable Member make that application. But I want to state one more thing, Mr Chairman, which was raised by almost all Honourable Members, that is many requests for specifications in the constituencies. So I want to ask for just one thing, because it is comprehensive, namely an allocation of RM100,000 for the district engineer. This was raised by many Honourable Members just now.

Dr. Hajah Halimah AliPAS · PNKaparEN

Kapar also asked for it.

This allocation involves RM20 million, which was announced by the Honourable Minister of Finance when tabling the budget, provided under item B.11 of the Ministry of Finance. This allocation is for the immediate repair of Federal Roads throughout the country, which will involve only small road maintenance works. For the information of the Honourable Members, we know that indeed this RM100,000 is very small. If we make a project of RM10,00 it can only be 10 projects. If it is RM20,000, only five projects. However, in fact, previously we never once

had even an allocation of RM100,000 for the district engineer. However, now we give RM100,000 to the district engineer so that he can ensure the works he needs to carry out. What I mean is, if there are branches covering the signboards which can affect visibility, the dirtiness of chevrons for example, which causes the route at night in areas without light to be lit by car headlights, then the chevron will glare back. This can reduce – on which many Honourable Members have raised the matter of lighting. We, the Ministry of Works, do not necessarily need to light the entire road. Therefore we use all the signboards that I mentioned just now, where one of the signs is where the road has a bend. So we use this RM100,000 allocation for cleaning — perhaps we will use up RM1,000 or RM2,000. We hire contractors or workers from JKR (Public Works Department) who will carry out those works. So, thank you Mr Chairman, I would like to take note of every issue and problem raised by the Honourable Member, always striving to make it a commitment to us — the problems that have been raised by the Honourable Members. I thank you because with what has been raised by the Honourable Members, I believe the Ministry of Works in the future will receive more allocation than what it has now.

So, given the limited time, I will answer in writing what was raised by the Honourable Members. With that, thank you Mr Chairman, thank you Honourable Members for raising many matters and being a source of inspiration to the Ministry of Works (KKR) to improve on everything raised by the Honourable Members. Thank you once again. I close with the words wabillahhi taufik wahidayah. Assalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, for what was not answered, please answer in writing, yes. Now I bring forward the matter of Head of Supply B.27 and Head of Development P.27 under the Ministry of Works, opened for the question that the sum of RM865,271,900 for Head B.27 of the 2023 Estimates of Operating Expenditure form part of the Schedule shall be agreed to. [Question put and agreed to] [Head B.27 ordered to form part of the Schedule]

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Following on, the question is that the expenditure under Head P.27 of the 2023 Estimates of Development Expenditure shall be approved. [Question put and agreed to] [Head P.27 to form part of the Estimates]

Bill — Supply Bill 2023 and Development Estimates Motion 2023 Committee — Head B.13 [Schedule] – Head P.13 [Development Estimates 2023] –Bill

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, we move on to the Ministry of Foreign Affairs. The debate on Head of Supply B.13 and Head of Development P.13 under the Ministry of Foreign Affairs is opened for debate.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

A total of 14 Honourable Members will debate, followed by the reply of the Honourable Minister. The following are the speakers listed. The Honourable Member for Ipoh Timur, the Honourable Member for Machang, the Honourable Member for Batang Lupar, the Honourable Member for Sik, the Honourable Member for Petaling Jaya, the Honourable Member for Beluran, the Honourable Member for Tuaran, the Honourable Member for Tumpat, the Honourable Member for Seputeh, the Honourable Member for Pokok Sena, the Honourable Member for Sri Gading, the Honourable Member for Arau, the Honourable Member for Tebrau and the Honourable Member for Sandakan. The time set is five minutes at the discretion of Mr Chairman. The Honourable Member for Ipoh Timur is invited to begin.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Mr Chairman, who is firm and dignified. I would like to record my millions of congratulations to all who won the other day, especially the Honourable Minister. I would like to draw the attention of Honourable Members to P.13 and B.13 for the Ministry of Foreign Affairs, specifically to Item 030300 – Southeast Asia Regional Centre for Counter-Terrorism (SEARCCT) and also Item 00100 – Offices and Buildings Overseas, and also Item 00500 – MTCP Programme. I will go straight into the argument. I want first to congratulate SEARCCT because in the proposed budget item, there is an increase from the 2022 estimate of more than RM4 million, rising sharply to more than RM7 million. Congratulations and well done if we pass it. This is because in the current international context and also at the domestic level, where we see an increase in the tendency towards radicalization and also the presence of anti-Islamism and also— there is indeed a narrative out there on the ground, at the international level and also domestically, that certain groups want to bring unrest to our society. We may be well aware that SEARCCT, or the Southeast Asia Regional Centre for Counter-Terrorism, one of the mandates given to them is counter-messaging and also counter-terrorism. Counter-terrorism is not, as we know, only through military means. There is soft counter-terrorism where it uses narrative, it uses storytelling, it uses engagement or dialogue where counter-messaging is sent out there as an argument against radicalised messaging, with permission. So, I ask that consideration be taken by the ministry. Not only is this year's increase because of projects to upgrade or repair the current SEARCCT building and also there are two conferences that are quite interesting and also important that will be secretariat by SEARCCT for the region, but also that allocation be provided by the Ministry of Finance for continuous increases in its allocation for the years to come. This is because it needs to play an important role as a diplomatic tool or diplomatic tool to enhance Malaysia's soft power or kuasa lunak, not only in the Southeast Asian region but also at the international stage. I also want to propose an increased allocation from 2022 to 2023 from RM5.6 million to RM8.5 million for the purpose of Item 00500 – MTCP Programme. This is to be considered together with the allocation for what I have proposed before, namely a citizen diplomacy where we invite the emerging leaders, rising stars, with permission, from strategic countries who have expertise not only in their fields but who have a bright future in their countries. This is so that they can become ambassadors to Malaysia when they return to their countries, becoming brand ambassadors, the brand of Malaysia.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Finally, I would like to request some consideration from the Honourable Minister and also the Honourable Minister of Finance that with such a sharp increase from RM8.5 million to RM43 million in development. In fact, most of it, as I see it, will certainly be used to repair assets overseas, which we mentioned just now under Item 00100. I have heard the complaints of several missions overseas, perhaps some for as long as 14 years have not had or have not had an allocation to hold National Day celebrations at the missions overseas. So, I ask for consideration so that there is not only development of assets but also development for programmatic approaches of diplomacy, with permission. That is all from me. Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Ipoh Timur. The Honourable Member for Machang is invited.

Thank you to Mr Chairman. I move straight to Item 040000 involving overseas representative offices. Mr Chairman, does Wisma Putra intend to increase the allocation for the Offices of Malaysian Ambassadors and High Commissioners abroad, to be used for them to carry out diplomatic work and networking, especially in engaging leaders and actors or parties involved in matters of the Ministry of Foreign Affairs in their respective countries? I have attended several embassies, and we face many problems in terms of infrastructure and facilities for our officers there, such as official cars, ICT equipment that needs to be changed, needs to be replaced with newer models to facilitate their work and affairs.

I move on to Item 010200 – Management Services. As in a few years' time, Indonesia will move its administrative centre to Nusantara, Kalimantan, does Wisma Putra intend to strengthen Wisma Putra's offices on the Borneo side, whether in Kota Kinabalu or in Sarawak, Kuching? This affects us in diplomacy with our neighbours with the presence of a new Wisma Putra office there. I would like to draw the attention of Mr Chairman to Item 040000 – Diplomatic Relations and Bilateral Cooperation. Among the initiatives once undertaken by the Foreign Minister under the Perikatan Nasional Government was cultural diplomacy, which was carried out by the Honourable Indera Mahkota. Alhamdulillah, I see the Honourable Minister recently explained that this agenda will be continued as part of our foreign policy. I would like to ask, does the ministry have a specific budget on this to promote our soft power through works of art, as I take an example from the Honourable Minister, namely drama? In Turkey, we have the drama Dirilis: Ertugrul, about the history of the Ottoman Empire, which is very popular in Pakistan. It is a form of soft power. If we look at Europe too, films or serial dramas like Game of Thrones received cultural funding from the EU to promote the history and culture of European people to the whole world. We have also recently seen an outstanding success. Malaysia in terms of culture, our cultural products, perhaps we can make animation. Our animation as one of our cultural products of soft power. Recently Mechamato succeeded in winning the Anime Fan Award at the Tokyo Anime Award Festival, which I think Japanese children are also interested in watching works made by our artists. So, if the Ministry of Foreign Affairs can cooperate with KKMM (Ministry of Communications and Multimedia), perhaps many things we can sell to ministries or foreign countries regarding our soft power.

Another item, Item 050500 – Seranta Programme, Public Diplomacy and Information. If at the Ministry of Youth and Sports we have the Corporate Fellows and Perdana Fellows programmes which are a niche for youth leadership programmes in the world of administration and management, I would like to propose to Wisma Putra to also introduce perhaps a programme named Diplomat Fellows for young people who are eligible and have merit to be placed with our representatives abroad for a period of three to six months to gain knowledge about diplomacy. Perhaps we can pay them flight tickets and allowances like MySTEP for consideration. Item 020200 – Human Rights and Humanitarian Affairs. Given that the Right Honourable Prime Minister will be going to Cambodia shortly, I would like to take the opportunity to request the good offices of the Honourable Prime Minister and also Wisma Putra to help a Malaysian citizen, Saudara Hemakavin a/l Karthigesu, who was arrested and imprisoned in 2016 for 25 years for being a victim of a drug mule syndicate. So, if Wisma Putra can perhaps share its views on this matter during the debate later. Furthermore, I hope the programmes drawn up by Wisma Putra can help Malaysia become a truly middle power. I am confident that the Honourable Prime Minister and also our capable Foreign Minister can continue this agenda because matters involving Wisma Putra are not something that can be politicised. We hope that this existing budget can help the missions of our diplomats in introducing and defending the sovereignty and interests of our country abroad. Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Machang. The Honourable Member for Batang Lupar is invited.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Bismillah. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman, for allowing me to join the debate at the Committee stage this afternoon. First, I would like to wish a Happy 216th Police Day to all PDRM members who are celebrating it. I want to move straight to Item 030200 – Maritime Affairs, which I think is a rather sensitive topic in the matter of diplomatic relations between Malaysia and China. However, it is important to be discussed in this august House because it involves the issue of national security and sovereignty. Mr Chairman, it cannot be denied that the military operations of the Chinese state in the South China Sea have caused concern among ASEAN member countries, including us, Malaysia. On 12 January this year, the presence of the CCG China Coast Guard vessel of the Chinese navy at Beting Patinggi Ali, located 84 nautical miles from the coast of Miri within Malaysia's Exclusive Economic Zone, has caused worry and disrupted the gas and oil exploration works being actively carried out in this area. In this regard, I thank the Royal Malaysian Navy and also the Malaysian Maritime Enforcement Agency, who are on standby to monitor the military activities of other countries around the maritime borders of Malaysia. However, Mr Chairman, this is not the first time a Chinese navy vessel has patrolled Beting Patinggi Ali. In fact, the national audit report also confirmed that the CCG China Coast Guard vessel of the Chinese navy has intruded into Malaysian waters 89 times between 2016 and 2019, and most of these occurred at Beting Patinggi Ali. Unfortunately, the diplomatic notes sent seemed not to be taken seriously by Beijing, because they continued to claim this area is within their nine-dash line claim. This situation is further worsened by the increasingly intensifying conflict between China and the United States in the surroundings of the South China Sea.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

I understand that it is not easy to balance the need to maintain good diplomatic relations between the two countries, Malaysia and China, while at the same time upholding the nation's sovereignty. However, I am concerned that if the country does not assert its position on Malaysia's maritime rights over this area, it will eventually fall into the hands of other parties. We cannot allow our national waters to be intruded upon at will and allow oil and gas resources to be seized just like that. Therefore, I would like to ask the ministry for an explanation: what plans and efforts does the Unity Government have to assert the country's position in rejecting China's claims around our national waters? What direction or plans does the Unity Government have through the Ministry of Foreign Affairs to resolve the issue at Beting Patinggi Ali once again? Worst comes to worst, with permission, is the ministry prepared to face any possibilities that may occur in the future if the situation becomes increasingly tense? Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Batang Lupar. I invite Honourable Sik.

Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you to Mr Chairman. Thank you, Honourable Minister. Firstly, I would like to record my deepest thanks and appreciation to Wisma Putra (Ministry of Foreign Affairs) for its close cooperation in assisting our humanitarian mission by the Perikatan Nasional Members of Parliament from 2 to 7 March, which was led by the Honourable Kubang Kerian. Alhamdulillah, this close cooperation can continue so that we can keep helping our brothers and sisters in Turkiye and also in Syria. Mr Chairman, I now move to Item 020200 – Human Rights and Humanitarian Affairs, which falls under the framework of Diplomatic Relations and Multilateral Cooperation. We are well aware that this item has seen an increase in its budget of 6.3 per cent. It is very important for us as Malaysia to take on a more serious role, especially in humanitarian matters, including the conflicts that are taking place in the ASEAN region, particularly in Myanmar.

During the visit of the Most Honourable Tambun to Bangkok last month, we very much agreed that Malaysia should be a more assertive country in ensuring that ASEAN plays a greater role in pressing and urging Myanmar to resolve its internal conflict immediately, because the conflict has spread across the whole region, including our country Malaysia, which has been flooded with tens of thousands of refugees from Myanmar. The repatriation programme (repatriation program) for refugees from the refugee camps in Cox's Bazar in Bangladesh, including those in our neighbouring country Thailand, appears to have failed to be realised by Myanmar and Bangladesh. Therefore, it is certainly necessary for us Malaysia to play a more active role, especially as we have mentioned The ASEAN Way, with permission, so that we no longer get dragged into this conflict, which has caused the human rights of the Rohingya refugees, especially in Rakhine State, to be stopped. Next, Mr Chairman, I also continue under this item regarding Malaysia's role in addressing or managing the ongoing conflict in southern Thailand, namely in Jalan Narathiwat, Pattani. Malaysia is certainly seen to be playing a better role in serving as a mediator for the conflict that has caused thousands to be killed and chaos to occur in that region. We can see from the historical record of negotiations led by Malaysia, including when the former Prime Minister, Tun Abdullah Ahmad Badawi, that

negotiations to bring the parties in conflict to a more peaceful table are greatly desired by all the people. Next, Mr Chairman, I return to Item 020400 – Organisation of Islamic Cooperation (OIC) and Regional Cooperation, which I am confident plays a greater role, including when Malaysia is an active member. We see that this year Wisma Putra needs to step forward with more courage and more firmness so that the OIC plays a greater role, especially in addressing the conflicts that have continued, namely the Palestinian issue, the atrocities of Israel and the Israeli Apartheid Policy, which today the world appears to be increasingly silent about, at a time when some of the peace plans being pursued do not appear to favour Palestine itself. This includes their two-state solution, with permission, Mr Chairman, which provides a situation that will harm the struggle of the Palestinian people themselves to achieve independence after they have been colonised since 1947.

Honourable Sik, Honourable Sik.

Therefore I propose that the allocation for the OIC needs to be increased. That amount appears rather small, and we cannot rely on outside countries, including Arab countries. Let us, who are far away in the east, play a role. We say that the Palestinian issue is one where we become the frontrunners to ensure, especially the issues of refugees, Palestinian residents, more than five million Palestinian refugees across the world. Some have come to Malaysia, some are in border countries such as Jordan, Lebanon and several other countries as well. We see it is mentioned, with permission, the right to return to Palestine. We are part of those who drive or the party that drives the OIC so that it is no longer seen merely as a body with no role at all. Honourable...

Honourable Sik, may I interrupt briefly? Your time is almost up. Just a little, may I?

Ya, silakan.

Thank you, Honourable Sik. Regarding the earlier issue of Palestine, does the Honourable Sik agree that this Parliament should declare the Israeli regime government an apartheid government? Let us declare it in this House. Secondly, can we also together send a delegation from the Parliament of Malaysia to Palestine? Thank you.

Yes, Honourable Ledang, I very much agree with that proposal and can include it in my speech. We have also held a meeting for Malaysia, us in the Parliament of Malaysia. In the history of our Parliament we have established a Parliamentary Caucus for Palestine, specifically so that we set a major agenda that the Israeli Apartheid Policy must be stopped. I agree that we Members of Parliament from all parties together express the same aspiration, the liberation of Palestine, and indeed, for us to hold a special visit to the land of Gaza, where we very much see the need for the whole world to ensure there is no more oppression against the people there. Mr Chairman, thank you.

Mr Chairman (Dato' Ramli bin Dato’ Mohd Nor)EN

Next, we invite Honourable Petaling Jaya.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you to Mr Chairman. I would like to touch on Supply 13, Item 020000 – Diplomatic Relations and Multilateral Cooperation. On this auspicious afternoon, allow me to focus on the human rights violations ignored by the Myanmar Junta and the stance and mechanism taken by Malaysia on this issue. We are well aware that the issue of violence by the junta in Myanmar and the oppressed Muslim Rohingya minority is no longer a foreign issue on the world stage. Malaysia itself has always been at the forefront in urging joint solutions that need to be taken by outside countries, especially ASEAN countries, so that this conflict can be brought to an end. Several issues that have occurred in Myanmar may have been forgotten. Firstly, according to international statistics, at least 2,371 people have been killed since the junta took over. Many of the killings were carried out against street demonstrators who were resisting the tyranny of the junta regime. Since March 2021, police and the military have begun using violence even though demonstrations were held peacefully. At least 700 people were killed, the majority of whom were shot dead, and at least 281 women and children were killed. Armed conflict has also become increasingly fierce since the coup. The junta has killed civilians through ground incursions, air strikes and other tactics. Mr Chairman, children and women. The Women's League of Burma and the Women's Advocacy Coalition also stated that the level of sexual violence has also increased since the coup by the junta. Even more worrying, the collapsing economy has made more women victims of human trafficking networks. Indeed, there were soldiers who raped a wife in front of her own husband in Chin State in November 2021. This case was recorded. Over 15,780 people have been detained, and at least 3,300 of them are women. They have been tortured with sexual violence and various humiliating acts while detained, in addition to being denied access to sanitary products, and this has undermined their women's human rights. Mr Chairman, regarding the Rohingya minority in Myanmar, the issue of Muslim Rohingya in Rakhine State also remains threatened for many years. The Myanmar Junta has also taken no action to reform the complex laws and policies that impose severe restrictions on the freedom of movement of the Rohingya, access to education, health and employment for decades. The Burmese Rohingya Organisation UK has also affirmed how the junta has disregarded the provisional measures imposed by the International Court of Justice that directed Myanmar to end the practice of genocide against the Rohingya. Mr Chairman, what is the solution? I propose here that ASEAN countries, including Malaysia, need to realise that the Five-Point Consensus has failed and the junta is not a trustworthy partner. ASEAN needs to disregard the Five-Point Consensus in the present context and negotiate a new agreement related to the Myanmar crisis with the National Unity Government (NUG) and representatives of the EAOs. The new agreement must be accompanied by an enforcement mechanism. Secondly, review the mandate of the AHA Centre to ensure it is effective for conflict situations, and indeed, strengthen its funding and logistical capacity. This includes pro-democracy forces for negotiations and work on human rights.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thirdly, change the mandate and appointment mechanism for a special envoy to Myanmar by ASEAN by making it a full-time position, with permission, and the special envoy should be appointed by all ASEAN countries rather than leaving the position

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

of the ASEAN Chair to rotate. The special envoy should represent and be responsible to the whole of ASEAN and not only to the Chair. Fourthly, provide asylum and legal protection to the fugitives or refugees who flee from Myanmar, including the Rohingya and other groups fleeing the atrocities of the military. Mr Chairman, here we do not need a policy solution from MOFA or the Ministry of Foreign Affairs, but we need a political solution with strong determination from among us. Here I display a picture of a person. [While showing the picture] He is a Member of Parliament from Myanmar. He was sentenced to death two years ago after the junta took power. So this issue is close to us, not far away. In ASEAN and related to all of us who are also representatives of the Dewan Rakyat. So I hope a swift and decisive action can be taken immediately. Thank you. [Applause]

Mr Chairman (Dato' Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Petaling Jaya. I invite Honourable Beluran.

[Speaking without using the microphone] Honourable Beluran is not present.

Mr Chairman (Dato' Ramli bin Dato’ Mohd Nor)EN

If Honourable Beluran one, call Honourable Beluran two, call Honourable Beluran three, is not present. The Honourable Member for Tuaran has also withdrawn. I invite Honourable Tumpat.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I refer to Item 020300 – Multilateral Security and International Organisations. We have been informed in this honourable House that the government has taken an action, namely by building fences at the border areas between Thailand and Malaysia, where fences have been built from Kedah to Perak. However, no mention has been made of security measures for international security, namely between Thailand and Malaysia for Negeri Kelantan with Thailand. I would like to ask the government's view from the Ministry of Foreign Affairs: are there, and what are, the initiatives adopted by the ministry to guarantee security between the two countries without any physical fence separating the two countries? That is the first. Secondly, we also want to refer to Item 030400 – Institute of Diplomacy and Foreign Relations (IDFR). It is understood from this budget book that it is used as a venue for briefing officers and certain parties in international relations. I would like to ask whether the government is prepared to open this IDFR to NGOs involved in international relations, because I think the time has come. Not just officers, but NGOs as the third force should also be given exposure and basic international issues, including to Members of Parliament, because any issues that occur at the international level will have an effect on the Malaysian people. Next, under Item 020600 – International Cooperation and Development, namely when the Government of Malaysia was announced by the ninth Prime Minister, the use of the Malay Language at the international level. I want to ask what cooperation has been made by the ministry with ASEAN countries, especially those that use the Malay Language as a lingua franca, involving nearly 320 million people in ASEAN. If this is made a common policy between foreign countries, can we have cooperation not only speaking in the Malay Language but also be able to retrieve and dig up again all the treasures of knowledge in the Malay Language that may have been buried in several countries and

Under Item 020100 – Multilateral Economy and Environment. We have just been informed that the Bursa Carbon Exchange was launched on 17 March 2023, which is the first Shariah-compliant exchange involving carbon. So, I would like to ask the government whether, at the level of cooperation between ASEAN countries' policies, there is an agreement regarding the use and also the trading of carbon that can help our country protect the environment while at the same time being able to profit from the shared use of airspace and this environment? If there is none yet, I request that a more serious discussion be held, involving not only the Ministry of Environment but also the Ministry of International Affairs, so that this issue can be managed together. Under Item 020200 – Human Rights and Humanitarian Affairs. Earlier, we heard about the situation that occurred in Rohingya. I also want to state that in this case, it is not only happening in Malaysia but in many countries. When it involves refugees or fugitives who are in our country, some among them are children. So, when it comes to children, they have no education. Therefore, what policy or what education system will we use for them, because the consequence of them not receiving a proper education is that we find many social problems and ills occurring in our country due to them not receiving education. I understand that when it comes to education, it involves costs. So, what relief will we obtain if we lead education for these people, because we have seen that many countries, whether stateless or other countries involved in wars, need education as a long-term measure that Malaysia may be able to play. Because we recently saw that the Prime Minister announced that the making or printing of the Al-Quran costs nearly RM1 million. So, I think it is also time for us to have a specific policy so that we can lead education at the international level, especially to help minority Islamic countries and also to prevent the understanding of Islamophobia that is spreading among other parties who do not know about Islam. Finally, regarding – in recent times we have seen under Item 020400 – Organisation of Islamic Cooperation (OIC) and Regional Cooperation. We see that the OIC no longer plays an active role, and recently we have also seen the occurrence of an ideological development that makes or shifts toward something called something that changes the original religion of Islam into the Abrahamic religion. So, I want to ask what efforts the government is making to lead and also take the initiative in discussions so that understanding and ideology like this do not spread in countries, especially involving OIC countries. So, this requires immediate action from our country. Under Item 030200 – Maritime Affairs. I want to ask what actions or initiatives have been led by the Ministry of Foreign Affairs regarding maritime affairs cooperation between Malaysia and Thailand. Because we see that, although it is said we have relations, if we look at the facilities available in the border states, especially in Negeri Kelantan, there are no facilities and no joint maritime centre that we see carrying out short-term or long-term cooperation with neighbouring countries, especially to ensure joint security in waters that are exposed to various threats, especially involving smuggling and terrorism. Thank you.

Mr Chairman (Dato' Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Tumpat. I invite Honourable Seputeh.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Thank you, Mr Chairman. I would like to refer to Item 020800 – ASEAN-Malaysia National Secretariat. We have heard several Honourable Members raise the issue concerning Myanmar. My question is, what will Wisma Putra (Ministry of Foreign Affairs) do through ASEAN and also through other parties to end the bloodshed in Myanmar? Recently, an NGO named Fortify Rights and 16 Myanmar nationals filed their case with the German Government and asked the German Government to investigate the crimes committed by the Myanmar military against the Rohingya in 2017 and also the crimes against all Myanmar nationals since the coup was carried out. Malaysia has signed the Genocide Convention, but we still have not passed any law that allows cases of murder or genocide to be tried in Malaysian courts. The time has come for us to begin translating our international commitments into domestic law. I would like to ask whether Wisma Putra is committed to working with the Ministry of Law and Institutional Reform to draft new laws against genocide and other international crimes. I understand that some parties are drafting a draft mutual legal assistance treaty. This draft will help us to end Myanmar's impunity for genocide, or as we say, impunity for genocide, war crimes and also crimes against humanity, by helping other countries to share evidence and also to hunt down perpetrators or offenders.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

So, will Wisma Putra send a representative to attend the discussions on the draft Mutual Legal Assistance Treaty that will be held in Slovenia at the end of May this year? Mr Chairman, I strongly agree with one issue raised by the Honourable Member for Machang earlier, in which he called on the Right Honourable Prime Minister and the government to bring back a Malaysian citizen named Hemakavin a/l Karthigesu who has been detained in a prison in Cambodia. According to his family, when this young man was detained he was 19 years old, and he is said to be definitely innocent. However, because he has been overseas, he has been languishing in a prison in Cambodia for many years, so we hope that Wisma Putra can do something, even though this concerns the laws of another country. If the Right Honourable Prime Minister can raise this with the Cambodian government and perhaps bring this person to be imprisoned in Malaysia, perhaps something we can do for the sake of goodwill between the two countries for this young man. Mr Chairman, I also wish to raise Item 020200 – Human Rights and Humanitarian Affairs. If we look at the UNHCR website, Malaysia has 181,000 refugees from various countries, or as we say, asylum seekers, in our country. Among this figure, 85 per cent come from Myanmar, including 103,000 Rohingya. The other refugees come from 50 other countries, including Pakistan, Yemen, Syria and Somalia, all of which are Islamic countries. So, we see that 67 per cent of the refugees are male and 33 per cent are female, and among them, 45,650 are children below the age of 18. They are mostly living in Peninsular Malaysia, especially in the Klang Valley, Johor and Penang. The problem we see now is that I understand why the government does not grant these refugees permission to work. We are worried that more will come to our country. However, if we do not allow them to work, they will work secretly, and they will often have to pay the enforcement officers who arrest them while they are working.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

We see that these Rohingya are already in their second and third generation in our country. So, I think we must have a formula to overcome this problem because our country is facing a shortage of manpower. We have to import labour from Bangladesh, Indonesia and other countries. I think Wisma Putra and also the Ministry of Home Affairs could perhaps work together to work out a formula. Let us see how we can allow these refugees, these Rohingya refugees, so that they can contribute their labour legally in our society. Give opportunities to their children and also to study in schools. I think that if 45,000 children below the age of 18 among us are not allowed to study, when they grow up they will become illiterate, stateless.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, please wind up.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

This is yet another burden on our country. I hope Wisma Putra....

Penjelasan.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

..... can do something.

Penjelasan.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Does the Honourable Member for Arau want to help me? Mr Chairman, may I be allowed?

No, the Honourable Member said that when enforcement officers come, they have to pay the enforcement officers. Is the Honourable Member accusing the enforcement officers of accepting bribes?

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, please answer and wind up.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

That depends on the Honourable Member's interpretation. The Honourable Member for Arau is not unaware of what I said. Now in Kuala Lumpur, I have received several complaints that they operate coffee shops or cafés, and they employ refugees including Rohingya. Then the DBKL enforcement officers raid once, then the police come once. In fact, we cannot chase away or send back these refugees. These people really need to work. They have been here for several generations.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Member, 30 seconds.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I think we must have a way to tackle this problem for the sake of humanity. That is all, thank you.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member. I now call upon the Honourable Member for Pokok Sena.

Assalamualaikum. Greetings of peace, Mr Chairman.

Mr Chairman (Dato' Ramli bin Dato' Mohd Nor)

Walaikumusalam.

Item 020400 – Organisation of Islamic Cooperation (OIC) and Regional Cooperation. I would like to know, in the context of the Malaysia–Qatar Regional Islamic Cooperation that was initiated by the Honourable Member for Marang while serving as the Special Envoy for the Middle East. The main focus of the strategic cooperation on Muslim issues that was mobilised at that time involved the interests of Palestine and Afghanistan. Among the main outcomes of the meeting with Qatar was the organisation of the International Ulama Conference and the Women Ulama Conference, which discussed issues

related to the Taliban's policies in Afghanistan. This in turn could help provide a direction and rough guidelines to the Afghan Government in rebuilding a more orderly administrative institution there. Mr Chairman, I would like to know what the continuation of cooperation carried out at the ministry level is, to further elevate strategic cooperation between Malaysia and Qatar to a higher level in order to lead issues and problems faced by Muslims? Is there any effort to organise an international-level conference to address the development of Islamophobia in Western countries, which continues to be a time bomb? We are aware of the incident of the burning of the Quran carried out by Rasmus Paludan in Sweden and the Islamophobia issues that have occurred there. It needs to be addressed in an integrated manner and requires strong support from Muslim countries. In fact, we are also worried about Islamophobia that has deliberately been allowed to spread within the country in recent times. Mr Chairman, Item 020600 – International Cooperation and Development. Recently, the Right Honourable Prime Minister made an official visit to Manila and met the President of the Philippines. I would like to obtain the ministry's explanation on the support and assistance designed through the Malaysia Technical Cooperation Programme (MCTP) for the Bangsamoro community following the establishment of its autonomous region. The meeting between the two leaders also indirectly signalled good relations between Malaysia and the Philippines, although the issue of the Sulu claim to Sabah remains in dispute. Mr Chairman, Item 030200 – Maritime Affairs. I would like to know the development of technical cooperation for the delimitation of the maritime boundary between Malaysia and Singapore, which was initiated by the ministry in 2020. How far has the development of the maritime boundary line by both countries progressed, especially after Batu Puteh fell into Singapore's hands through the decision of the International Court of Justice (ICJ) in 2008. I would also like to know what the main recommendations of the Special Task Force (PPK) set up to submit a legal review on the sovereignty cases of Batu Puteh, Batuan Tengah and also Tubir Selatan are. What options have been presented and to what extent have actions been taken based on those recommendations? I would also like to know whether there is any recommendation from the PPK that consideration also be given to Pulau Pisang, which has the same criteria as Batu Puteh. Although so far both the Malaysian and Singaporean governments acknowledge that Pulau Pisang is under the sovereignty of the country, nevertheless we can at least do something to ensure the sovereignty of Pulau Pisang is fully guaranteed.

Is there any effort to take over the management of the lighthouse on Pulau Pisang and to develop new technology for ship navigation for vessels entering through the Straits of Malacca? Thank you, Mr Chairman.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Pokok Sena. I now call upon the Honourable Member for Sri Gading.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. Sri Gading brings up a discussion or debate relating to B.13 Item 030300 – Southeast Asia Regional Centre for Counter-Terrorism (SEARCCT).

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

There is an increase in allocation totalling RM3.3 million to the Southeast Asia Regional Centre for Counter-Terrorism. Here I would like to raise several questions regarding security relating to the duties of the Regional Centre as stated, namely that SEARCCT has carried out various initiatives in facing the threat of terrorism through campaigns, workshops for young people and Impact (IM2PAK), and projects and dialogue programmes. Most of these initiatives are implemented with youth as the focus. However, there have not yet been any initiatives held in schools. Does the government, through SEARCCT, intend to implement special initiatives for school students? Second, regarding the issue of extremism and radicalism in Malaysia, which is seen to have different dynamics in terms of socio-economics, politics and security issues. For example, in Sabah, attention has shifted to the Sulu issue and the activities of Abu Sayyaf in southern Philippines. Meanwhile, in Peninsular Malaysia, we often hear of religious extremist activities, such as the recent one detected as Al-Malaka. My question is, does the government, through SEARCCT, have different action plans for these two geographical areas? What initiatives are implemented by SEARCCT to address the problem of foreign influence and extremism in rural areas, particularly in the state of Sabah where, recently, it was said that there are collaborators who helped the Sulu side make claims on our country, Malaysia? Third point, Malaysia has introduced five main pillars for the Malaysia Cyber Security Strategy 2020–2024. This shows that Malaysia is serious in facing the cyber challenges that are increasingly growing in this country. My question is, what initiatives does the government, through SEARCCT, have to enhance the nation's cyber defence? Is the government open to bringing in foreign models such as, for example, the UK NCSC as a guide? Head B.13 Item 030400 – Institute of Diplomacy and Foreign Relations (IDFR) with an additional allocation of RM3.336 million. Where, if we look here, it involves an increase for the agency that conducts foreign relations training for Malaysian diplomats as well as foreign diplomats. IDFR receives an increase in allocation of RM3.3 million, while MTCP under IDFR also receives an increase of RM2.8 million. The question is, with the increase in IDFR's allocation under Item 030400, will more cooperation be carried out with local universities as well as foreign universities to increase the sharing of knowledge and information in ensuring that IDFR's mission to produce quality diplomats is achieved? There is an increase under Item 00500 – MTCP Programme, namely RM2.8 million for the year 2023. Here I would like to raise the question, can the government give details of the MTCP scholarship allocation for 2022 and 2023? Will the increase in allocation mean there will be an increase in scholarship allocation for 2023? Can the government give details of the dates and themes of the programmes to be implemented this year? Will this year show an increase in participation from other developing countries? Head B.13 Item 040300 – Overseas Representative Offices with an additional allocation of RM26.9 million. Referring to such a large increase in allocation, with this increase, will the government establish, or improve facilities in, countries that are in conflict, such as the Malaysian Embassy in Kyiv, Ukraine, in ensuring the safety of Malaysian representatives there? Second, will the government review the list of hardship postings? Does the government intend to add the number of countries to that list? Head P.13 Item 00100 – Offices and Buildings Overseas. With an increase of RM92.2 million, will the government intend to open new embassy offices overseas? Can the government give details of the number of new offices to be built? What are the positive and negative impacts of opening offices in those countries? What fields will be the priority of the government in increasing bilateral relations with other countries? Thank you.

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Can the government give details of the number of new offices to be built? What are the positive and negative impacts of opening offices in those countries? What fields will be the priority of the government in increasing bilateral relations with other countries? Thank you.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Sri Gading. I now call upon the Honourable Member for Arau.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh. Good afternoon, greetings of peace.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Those in Palestine will hear too.

Mr Chairman, friends, Malaysians, young people and also the people of Sarawak who are watching the debate that I will bring later. I want to tell you that Arau and Sarawak are inseparable. [Applause] First of all, before I came in, several people told me on the phone, "Dato', don't forget to include the EPF matter." I said, "Now the Ministry of Foreign Affairs," and my villagers told me to send greetings to Mr Chairman. He calls him 'Abang Misai'. [Laughter] So he said, "Send greetings to Abang Misai," and friends outside said, "Surely Abang Misai will not allow it because this is the Ministry of Foreign Affairs." However, the aspiration was achieved, and it has also been answered by the Right Honourable Prime Minister regarding the EPF, but they said, "Raise it anyway. We want the EPF." I said, "All right, I will raise it." Okay, the first point is under Item 030200 – Maritime Affairs. Honourable Member, this is the title that I have been bringing for a very long time. When I was a Minister, by the grace of Allah SWT, I held the National Security Council and this matter was hotly discussed, that Beting Patinggi Ali — or in maritime language, it is called South Luconia Shoals or Beting Patinggi Ali. However, China also has a Chinese name, namely Nankang Ansha. So, they also put the same name. This is to the south of Beting Luconia Selatan. Luconia Utara is a cluster of Beting Raja Jarum. There are many shoals here. In future we could put 'Beting Cameron Highlands' or 'Beting Shahidan', there is no problem. There are many shoals here, yes. Beting Merpati and so on. However, I raise this cluster of Beting Patinggi Ali because it is an area that is very important for the country. This area already has four oil wells that have been explored by PETRONAS but could not operate because intrusions have occurred. This is not an overlapping claim. This overlapping claim is at our border.

This Beting Patinggi Ali is located, if I may answer first, if I remember correctly, 82 kilometres from the coast of Sarawak. However, this is the report that was given to me, which says 84 nautical miles, and its distance from China is given here as 200, but in fact my record shows that it is 400 nautical miles from Hainan to this shoal. To reach this shoal it must pass through the Spratly Islands, must pass through the Philippines, must pass through Vietnam, must pass through Brunei, before reaching this shoal. Suddenly, a claim was made by China on this shoal. On the basis that there is a history of ships in the past that sank here, therefore it is claimed. However, they also comply with international rules, although they are not members of the international maritime waters, but they comply, they do not drop anchor there,

they simply sit in a floating state, with permission, and they are there; the China Coast Guard ship is there. Our ship, TUDM (Royal Malaysian Air Force), is also there, and APM (Malaysian Civil Defence Force) is also there but at a long distance, each monitoring the other. So the Ministry of Foreign Affairs will answer that – the Honourable Minister will say, we have made a diplomatic protest, this is not a diplomatic matter, they must leave. Earlier, when I made a fuss about this matter, when the president of the country concerned wanted to visit Malaysia, they left for a month, but after a month they came back because we did not go and take the place where he had sat before. He sat near Beting and when they returned they sat in that place. Until today they are there, and I know many of us, perhaps even the Minister has never gone, many people have never gone, and if we look at this place it is within Malaysian territory. Our EEZ is 200 nautical miles, but these ones sit within 84 kilometres of Malaysian territory, far from the Spratly Islands, our Layang-Layang reef is in front there. But they come close to Pulau Natuna and I ask that this time the government be firm. We send our diplomatic note, they reply that they are conducting search, diving operations and so on. But they have been sitting there since 2013 until now, and we have said that among them perhaps we are being bullied, with permission, by a big country. This cannot be allowed. We must ensure this is our right, they must leave, otherwise what happened at Batu Puteh will happen, where the United Nations will give recognition to whoever is there at all times. That is why whoever is there at all times at Batu Puteh is Singapore. Those at Beting Patinggi Ali now are their ships that are there. If they claim in future who has been there the longest, they and we are there only from time to time...

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Member, please wind up, Honourable Member.

That is about Beting, Honourable Member, Beting Patinggi Ali. I ask the ministry to answer, saying this is a diplomatic note and so on; this answer is already commonly heard. We want to hear that the government is firm that Beting Patinggi Ali must be returned to Malaysia. [Applause] This is the view of all of us from Sarawak. Now I move on a little to the next point, which is first, and the second is about what was said by the Honourable Member for Seputeh just now, regarding Rohingya immigrants. They get UNHCR cards. UNHCR, these cards are given to them, but the problem is the same card has already been given to people in Indonesia, in the Philippines, in other countries. They give cards but they come to Malaysia. These cards now, the major problem...

Tuan Haji Aminolhuda HassanAMANAH · PHSri GadingEN

Time is already up.

They can be bought in Chow Kit. Earlier, when I was Minister, I told my officer to go and buy them, and we got RM200, Honourable Member. Now even RM30 is possible.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Honourable Member to wind up, second time.

So, I ask that UNHCR be reviewed because they commercialise the cards, and eventually sometimes our security personnel believe these cards are valuable. Finally, Honourable Member, Item 040300 – Overseas Representative Offices. I want to ask the Overseas Representative Offices to be careful with statements that

are issued by the Honourable Member, so that they are not disseminated, because actually this is still at our stage, we are still negotiating. First, there may be demonstrations and so on, B40 people used and paid to hold demonstrations. No, Honourable Member! So don't go and tell any party that there is. Second, there are people who want to seize power, and therefore we use the keris.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

I will cut you off in 30 seconds.

I ask that this too not be told, nothing happened. This country is peaceful and calm, Honourable Member! Don't go making exaggerated stories. [Applause] I thank Abang Misai [Laughter] and all Honourable Members, gentlemen and ladies, who have listened to this debate, which is not like this one. Thank you, assalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Arau.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Honourable Member for Arau, good show.

Mr Chairman (Dato’ Ramli bin Dato’ Mohd Nor)EN

Next, we invite the Honourable Member for Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Mr Chairman. Before Tebrau begins, I would like to take this opportunity to wish a Happy Police Day to police members, especially under the Tebrau Parliamentary constituency, namely at IPD JBS and also IPD Seri Alam. Mr Chairman, I begin with Item 040300 – Overseas Representative Offices. One of the hot issues in Malaysia is the issue of, with permission, human trafficking or job scams, where many Malaysian children are scammed into going to work in Cambodia, Laos, Vietnam and of course Myanmar. This issue has become one that has disturbed public order, and yes, we can admit that sometimes Malaysian children perhaps have little awareness and knowledge, and are easily deceived into going to work there, and when they arrive there they are told the salary is lucrative. Eventually they are caught, locked up in a room and forced to work as scammers, and if they do not comply, sometimes they are beaten, denied food and so on. Therefore I want to ask the Wisma Putra side. First, I seek clarification: how many cases so far have been successfully resolved by Wisma Putra, and how many Malaysian citizens have been rescued and returned to Malaysian soil? Second, I also hope to get some clarification: what is Wisma Putra's actual SOP when receiving a complaint of such a case, from start to finish? I also want clarification: if ordinary members of the public, for example family members of victims, want assistance, can they contact Wisma Putra directly? And if we as people's representatives, including Members of Parliament under our constituencies facing this problem, how can we directly contact the Wisma Putra office to help the people in this matter? The second issue, Mr Chairman, is the one that many have mentioned earlier, the issue in Myanmar and also the issue of refugees and asylum seekers under Item 040100. As mentioned by the Honourable Member for Seputeh earlier, under data from UNHCR, now we have 181,000 refugees in Malaysia, of which 85 per cent are Myanmar nationals; about 105,000 are Rohingya. Actually, I want to stress here that the Rohingya issue is not a new issue; even UNHCR itself acknowledges that 10 years ago there were nearly 100,000 Rohingya who came to

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Malaysia. In fact, I am very confident the number of Rohingya in Malaysia far exceeds the figures officially recorded by UNHCR. Yes, we indeed sympathise with what is happening in Myanmar and also with the plight of the Rohingya. However, I want to say here that our sympathy also has limits. When we continue to accept Rohingya, they cannot get jobs. If what the Honourable Member for Seputeh said becomes reality, that they get jobs, then good. However, to date hundreds of thousands of Rohingya cannot work. Who will feed them? Who will help them, who will look after them? Eventually they will enter society and many social issues will arise. Some, like the Honourable Member for Seputeh said, steal jobs secretly; some suddenly do business in the villages too. Some have also taken up settlements in villages and turned them into Rohingya villages. Actually, this greatly worries the local community. [The Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee]

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Therefore, I want to ask the ministry. Does the Wisma Putra Ministry have any proposal to resettle them back to their original place, or has it discussed with other countries for them to be placed in other countries, if those countries are interested? One more issue, Mr Chairman, is the issue of maritime affairs, where we often hear of incursions by foreign fishermen, particularly from Vietnam and Indonesia, into Malaysian waters. I think this is a very dangerous action, and the incursions are more frequent now. If they enter, not only do they take our marine resources from our fishermen, but I am more worried that if they enter, they are actually not fishermen. Perhaps they are agents, perhaps intelligence, perhaps spies coming to obtain data or information from our country. Last, I also hope the Honourable Minister can provide clarification. As the Honourable Member for Johor, what are the latest developments in the Pulau Batu Puteh issue after the Honourable Prime Minister announced that we will have further negotiations, further discussion with the Singapore side on this issue? I hope the Pulau Batu Puteh issue can be resolved in the best way, peacefully and amicably between two countries, through the best diplomatic channels. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Tebrau. I invite the Honourable Member for Sandakan.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Chairman. First, I would like to refer to Item 20000 – Services and Supplies, where a total of RM43.4 million has been estimated for 2023. This is an increase of more than 400 per cent from last year. Can the ministry explain a little about this increase? Second, I would like to refer to Item 040100 – Asia Division, Item 040200 – Europe, America, Africa and Australia, New Zealand and Asia Pacific (ANZAP) Division; and Item 040300 – Overseas Representative Offices. Mr Chairman, I regard the issue of foreign immigrants in Sabah as the mother of all issues in Sabah, with permission. Given that the immigrant issue has affected Sabah for a period of 30 years, involving security, social

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

and economic matters for us. However, there is still no clearer direction or approach taken until now to tackle this issue seriously. So, one of the most important steps to help reduce the problems posed by the foreign immigrant issue in Sabah is for the Philippine Consulate to establish its permanent consular office in Kota Kinabalu and Sandakan for the benefit of thousands of Filipino immigrants or migrants who now live in Sabah. I strongly urge the Honourable Minister to press his Filipino counterpart to do this as soon as possible, because the permanent consulate office in Sabah has long been delayed or awaited. The establishment of a permanent consulate office in Sabah is seen to benefit both Malaysia and Filipino citizens. In another matter too, I want to call on the Honourable Minister and his ministry to be more proactive in carrying out engagement sessions with all high commissioners and foreign embassies to review the current travel advisories issued for their citizens' travel to East Sabah. First of all, in a related development, I want to commend the US Department of State for its review of the travel advisory to East Sabah, where it has been lowered to level two, that is, with permission, exercise increased caution. However, many other countries in Asia Pacific and Europe, such as the UK, Canada, New Zealand, Japan and also South Korea, still impose standing advisories at level three or higher stating avoid non-essential travel, with permission, to Sabah. So, I do not believe this is an accurate picture of the situation in this state. Thus, such advisories have also undermined our efforts to attract more foreign investment and foreign tourists to Sabah. Therefore, I strongly urge the Honourable Minister and his ministry to engage with these embassies and show that travel advisories of this kind for East Sabah are not encouraged, as they are irrelevant at this time. That is all from me. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Sandakan. I ask the Honourable Minister to respond within 20 minutes.

Dato' Sri Diraja Zambry bin Abd KadirMinister of Foreign AffairsEN

Thank you, Mr Chairman. Assalamualaikum warahmatullahi wabarakatuh. First, I would like to wish a happy celebration of the 216th Police Day, "Police and Society, Forever Together". Thank you, Mr Chairman, for giving me the space to wind up matters relating to the Ministry of Foreign Affairs in the debate on the Appropriation Bill 2023, at the Committee stage in this august House. Within the limited time available, I will try to answer as many questions as possible. If there are questions that cannot be answered in time, the ministry will answer them in writing. On behalf of the ministry, I record my highest appreciation and thanks to all Honourable Members who debated the important issues under the purview of this ministry just now. The Ministry of Foreign Affairs is the driver and implementer of foreign policy, playing a role in protecting and advancing Malaysia's interests on the international stage through dynamic and proactive diplomacy. I record my highest appreciation to the Honourable Member for Tambun for recognising the important role and functions played by the ministry, through the increase in allocation of 12.4 per cent amounting to RM971.13 million for 2023. Of this amount, RM809.61 million is allocated for operating expenditure and RM161.52 million for the development budget, recording increases of 6.5 per cent and 49.3 per cent respectively compared with last year.

Dato' Sri Diraja Zambry bin Abd KadirMinister of Foreign AffairsEN

For the information of this august House, more than 75 per cent of the ministry's expenditure is spent overseas. This covers payment of operating costs for 106 representative offices around the world, emoluments of officers and staff, maintenance and utilities of office buildings and residences, payment of costs for organising and Malaysia's participation in visits and meetings overseas, as well as the government's annual contribution commitments to international bodies. All these expenses must be made in foreign currencies such as the US Dollar, the Euro and others, depending on the host countries concerned. Therefore, the ministry directly feels the impact of the costs and expenses that must be borne overseas. When the ringgit trades low, it contributes to an increase in the exchange rate of the ringgit against those foreign currencies. Nevertheless, the ministry strives to ensure that the operating costs and expenses of Malaysia's representative offices remain controlled and do not rise sharply. These savings and internal control efforts are aimed at ensuring the budget allocation received is sufficient to meet the ministry's current needs. Overall, the increase in allocation this year greatly helps the ministry continue to deliver efficient and effective services to all citizens, stakeholders and interested parties. It also helps in the process of improving the infrastructure of Malaysia's representative offices and contributes to the ministry's more active and effective diplomacy and engagement at regional and international platforms. Based on the strategic pillars of foreign policy, the ministry will continue to focus all efforts on strengthening bilateral diplomacy, multilateral diplomacy, ASEAN cooperation, defending the sovereignty and integrity of the maritime territory, promoting Malaysia through public diplomacy, and strengthening institutions and enhancing the capacity of human capital.

Dato' Sri Diraja Zambry bin Abd KadirMinister of Foreign AffairsEN

Mr Chairman, I would like to place on record my highest appreciation to the Honourable Member for Tambun for the increase in the estimated development expenditure allocation of the Ministry of Foreign Affairs by 49.3 per cent, amounting to RM161.52 million for the year 2023. Most of this increase involves RM50 million allocated as a one-off, with permission. This additional allocation, especially the one-off allocation, is important because it will be used to upgrade and repair the infrastructure and buildings under the ministry's supervision, particularly Malaysian representative offices overseas, such as chancery buildings or embassies, official residences and quarters, with permission, home-based staff who require critical and urgent upgrading and repair works due to the damage sustained. In addition, the Wisma Putra Complex in Putrajaya and the Institute of Diplomacy and Foreign Relations in Kuala Lumpur will also be upgraded. Overall, for this year the ministry will focus on 18 development projects, namely 12 continuing projects and six new projects. Issues of national sovereignty and security, as raised by some Members of this House just now, as the first line of defence, with permission, of the country against any external threat, the Ministry of Foreign Affairs has never compromised on issues involving national sovereignty and security, particularly those relating to the integrity and sovereignty of territory, land, maritime and air, and the country's interests in political, economic and social terms. The ministry also takes seriously and pays attention to the welfare issues of Malaysians overseas. In this regard, I would like to touch on several key issues that directly affect the country, which are being handled by the ministry in an integrated and comprehensive manner with the cooperation of all

Dato' Sri Diraja Zambry bin Abd KadirMinister of Foreign AffairsEN

relevant ministries and agencies. These issues have also been raised by several Honourable Members during the debate just now. The issue relating to the Southeast Asia Regional Centre for Counter-Terrorism (SEARCCT). The Ministry of Foreign Affairs is also always committed to efforts to tackle the threat of terrorism and extremism through the Southeast Asia Regional Centre for Counter-Terrorism, with permission, Southeast Asia Regional Centre for Counter-Terrorism (SEARCCT). SEARCCT is a training and research centre in the field of terrorism and counter-terrorism which is also involved in activities to prevent radicalisation. It was established by the Government of Malaysia through a national initiative. SEARCCT implements, with permission, a soft approach in tackling terrorism by training and enhancing the capacity of government officers and stakeholders through the organisation of training and capacity-building programmes, public awareness and research activities with the cooperation of various parties at local, regional and international levels. Since its establishment in 2003, SEARCCT has implemented a total of 320 programmes involving the participation of 12,525 participants. Of that total, 8,309 were domestic participants, while 4,216 were overseas participants. Last year SEARCCT successfully implemented 28 programmes involving 1,235 participants. For the year 2023, SEARCCT has received an estimated allocation amounting to RM7.72 million, an increase of 42.8 per cent compared with last year. This increase in allocation is to cater for the programmes and activities planned for this year, including the large-scale international conference organised by SEARCCT, namely the SEARCCT International Conference 2023, with permission, themed, 'Building Digital Resilience in Preventing and Countering Violent Extremism', in Kuala Lumpur from 13 to 15 June 2023. This international conference is in conjunction with the 20th anniversary celebration of SEARCCT's establishment in 2003. Some Honourable Members asked about programmes organised by SEARCCT other than international and local conferences. Apart from that, SEARCCT will also this year implement a regional workshop programme, 'Sharing Together for Online Resilience Among Youths'. There was a question about what programmes are carried out for the youth. This is one of the youth programmes involving youth leaders from Malaysia and ASEAN regional countries, with the objective of encouraging the participation and involvement of youths in issues relating to the prevention of terrorism and extremism. Apart from that, SEARCCT will also implement the 'Sports for Enhancing Resilience and Amplifying Social Inclusion' workshop. This is one of the programmes that will be continued. This also includes a programme called the national lecture, which is a public lecture organised by SEARCCT every year in August or September in conjunction with the Malaysian Independence Month celebrations. The CBRNE Terrorism Awareness and Medical Emergency Consequence Management Workshop and the Aviation Security Workshop. All of these aim to provide knowledge through training programmes and to give exposure to young people and those involved in them. The issue of intrusion...

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without microphone]

I think they want to ask a question. The issue relating to the intrusion of foreign vessels in Malaysian waters. The Ministry of Foreign Affairs is aware of the presence of foreign government vessels in the South China Sea, where these vessels are carrying out operations, with permission,

freedom of navigation, which is a common practice by navies at the international level. However, the issue of the intrusion of foreign vessels into Malaysia's maritime zone, especially foreign coast guard vessels or foreign fishermen, the Government of Malaysia takes seriously any intrusion into the country's waters, and as the Honourable Member for Arau said, we consistently continue our diplomatic protest notes, and these are the channels of diplomatic relations that we often use. The ministry, together with related agencies such as the National Security Council (MKN), the Malaysian Maritime Enforcement Agency (APMM) and the Royal Malaysian Navy (TLDM), is always committed and gives special attention to the security and the issue of intrusion in the country's waters, and ensures that the country's economic and marine resources are not exploited by foreign parties.

Honourable Member, a brief clarification.

Thank you. The Honourable Member's speech was truly great and impressive, but he touched a lot on policy. So when we are at the committee stage, we ask the Honourable Member to answer the questions we raise for each head that has been allocated. So I mention Beting Patinggi Ali because it is located 82 nautical miles from the coast of Sarawak, and they stay there not on an alternating basis, they stay 24 hours. They are there all the time. So if we use diplomatic notes, this is what happens, they just stay there. But the Indonesian Government has taken firm action against any foreign vessels or foreign fishermen, it takes firm action. First, it sinks foreign vessels or foreign fishermen that come there, and it can be said that no foreign fishermen dare to enter Indonesia. But we are still in the process of arresting them and keeping them at the jetty, and in the end our jetty is full of foreign boats that have been arrested, but court action takes years.

However, these China coast guard vessels are there and are staying there. Diplomatic notes have no effect because they simply pretend not to know, because they do not recognise UNCLOS and other matters. So, I ask the Honourable Member for firm action and to tell us when they intend to leave. If we are only able to place our ships there, within Malaysian territory. This is not an overlapping claim. They are only there because there is history, because this sea is called the South China Sea. I say this South China Sea is the South of China, not China's. That is why in my time I asked the Honourable Member for firm action, that the Malaysian Government would remove any vessels, whether from China or other countries. If they are in our waters, the safe passage, if they are moving, there is no problem. That is international law. Now they are not moving, they are staying and settling there, and we have to spend millions of ringgit to station our ships there to watch them. However, we have not taken firm action to order them to leave, or like Indonesia, spraying water with— it uses water to spray foreign vessels. Thank you.

Thank you to the Honourable Member for Arau, who once handled this issue because, if I am not mistaken, he was a Minister in the Prime Minister's Department who handled the Malaysian Maritime Enforcement Agency at one time. So, he is well aware of the areas concerned and he also knows the steps that can and cannot be taken, as well as

the best approaches that can be taken in the context of relations between two countries. However, I take note of what the Honourable Member for Arau has raised because it relates to our area. On this, I agree with the view of the Honourable Member for Arau. It is not a disputed area. We must clarify this. I ask Members of this House not to use the term disputed area at all, because if any of us uses disputed area, it will give room for them to say that now even Malaysia is not confident whether that area is its area or not. So, this is a reminder. I ask the Honourable Members. This is not a matter of there and here. This relates to our country's sovereignty. It also relates to actions other than diplomatic protest notes. We have also asked JUPEN to take the necessary steps to verify our location and coordinate with the vessels in the area. Likewise with the measures taken by APMM and TLDM, who are always in the area concerned. So, those are among the views in answer to the question about the position of foreign vessels. Matters relating to language and cultural diplomacy raised by the Honourable Member for Machang are part of our efforts to develop the industry and so on. This is called in the context of our soft power. Malaysia needs to be at the forefront in introducing what was also used previously, namely cultural diplomacy, which we can use as one of the avenues and channels for us to introduce our country at the international level. This requires cooperation with other ministries too. As was mentioned earlier in the digital industry and others. The Ministry of Communications and Digital, the Ministry of Tourism, Arts and Culture, to identify commercial opportunities to promote Malaysia's creative industry overseas. This is one of the branches that we can implement in the context of our soft power through the channel that is referred to as cultural diplomacy or diplomasi budaya. As for the matter relating to the Seranta and Public Diplomacy Programme 2023, which was also raised by the Honourable Member for Machang just now, namely the Ministry of Foreign Affairs is also active in public diplomacy efforts through the Seranta, Information and Public Diplomacy Programme to publicise and raise public awareness about Malaysia's foreign policy as well as the efforts to be taken by the Government of Malaysia at the regional and international levels. Thus, an allocation of RM400,000 that has been received for the year 2023, the ministry is planning to organise state visit programmes and also for heads of foreign missions, including in the Perak area, and in other states. This is so that the familiarisation visits will open up their perspective of our own country. The ministry also organises a Seranta programme focusing on campaigns and public awareness elements regarding the syndicated crime of job offer fraud, or job scam, throughout Malaysia this year. The ministry also informs that a sum of RM500,050 has been distributed to 106 Malaysian representative offices overseas under the programme to engage with Malaysians. This distribution will be used by Malaysian representatives to organise programmes and activities that strengthen relations between the representatives and Malaysians in local countries. Also raised was the matter of our fellow diplomats. Malaysian diplomatic representative offices overseas have also invited young people and Malaysian students studying overseas to undertake internship programmes, and we give them space. For example, recently several students applied to be allowed to join internship programmes overseas. They are overseas and are given space to interact and also to carry out

their internship at our missions overseas. Here, students and young people will be exposed to diplomatic functions directly. We hope that with this exposure, one day we will have young people who are skilled in the field of diplomacy. Matters relating to a person accused of being a drug mule, and several Members of this House also raised this issue. We are continuing our efforts. It has indeed been monitored by the Wisma Putra side all this time, and our representative in Phnom Penh has visited and extended appropriate consular assistance since the individual was placed in a Cambodian prison. This matter will also be raised later so that further negotiations can be carried out without intending to interfere in the affairs of that country, especially in its legal field. Our representative has held several meetings with the Cambodian authorities to obtain advice on how the pardon application process can be carried out. So, this process will continue until such time as they can give the appropriate consideration in this matter.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Minister, could you wind up within two minutes?

Sorry. There are still many Honourable Members. I respect what the Chairman has requested. As for the matter relating to the issue of Palestine and Israel, as the esteemed Members of this House are aware, Malaysia remains firm in championing the end of the prolonged suffering of the Palestinian people and the restoration of peace, freedom and independence of the State of Palestine. The people of Palestine have faced all forms of oppressive and inhumane actions by the Israeli regime since 1948. Up to now, there is no end to it. The injustice towards Palestine has become more extreme after Benjamin Netanyahu returned to the helm of the Israeli regime and was supported by radical parties.

Within a period of not more than three months since leading Israel, the provocative actions, oppressive policies and seizure of the rights of the Palestinian people on their own land by the Israeli regime have been seen to be increasingly rampant, surpassing previous records. It clearly shows the true face of the Israeli regime as a practitioner of apartheid policies. Malaysia will continue to give firm support and champion the rights of the Palestinian people on all platforms, including the Organisation of Islamic Cooperation (OIC), UN Human Rights and the Non-Aligned Movement, towards achieving complete freedom from the illegal occupation by Israel and the establishment of an independent and sovereign State of Palestine based on the pre-1967 borders with Baitulmuqaddis (Jerusalem) as the capital of Palestine. Malaysia will also always urge the international community, especially the UN Security Council, to put pressure on the Israeli regime to stop the apartheid policies as well as the violent attacks carried out against the Palestinian people.

Mr Chairman, just a little, before I sum up. Earlier it was proposed that we in Parliament establish a Parliamentary Caucus for Palestine. On the part of the ministry itself, can this proposal be realised together? Thank you.

Agreed. Because previously we were also informed that there are caucuses that have been formed, both officially and unofficially. In fact, in our latest retreat, we decided to create a mapping among Members of Parliament to form groups that can address issues relating to international issues that are also connected with Malaysia. This includes, one of them, the Palestine-Israel issue. So, I agree with the proposal that was conveyed.

Honourable Member, may I ask that the Honourable Minister reply in writing? Because many friends have raised it earlier. So, a written reply. Because the Honourable Member's answer, as a former lecturer, was polished, great, greater than the Honourable Member for Ampang, who knows nothing. The Honourable Member has answered brilliantly. So, I ask you please to reply in writing. Thank you.

[Speaking without using the microphone]

Ampang. Never mind, he is our friend, that is normal. Alright, next I will briefly...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

...I would also like to respond to the issue of the Rohingya, which we have already debated before in this House, including the matter relating to Myanmar, to which I have answered many times and whose questions are raised each time. As for matters related to this, I think most of our Members of Parliament are already aware of them. However, our commitment, Malaysia's commitment, I repeat once more, is that we will not budge from our position of not recognising the Tatmadaw regime currently in Myanmar until a comprehensive resolution is achieved on the basis of the 5PC. Although there are among the Honourable Members who have said that the 5PC has failed, in the context of the 5PC, we need to first look at what is meant by the 5PC. It is a process that is not only negotiation but also pressuring this regime together with our other ASEAN partners, because the problem faced in the context of Myanmar cannot be addressed alone. I want to tell all Members of the House that we have held various series of meetings. I want to state, not merely that we wish to confront them, but also the groups that oppose this, whose rights have been denied. We will continue to press them so that, in the end, a comprehensive solution can be implemented in Myanmar. Apart from that, Mr Chairman, many other issues will be answered by me in writing to all Honourable Members. This is because the Honourable Members have raised issues that are important to the nation, relating to strategic issues for the country, which require knowledge and also information for all Honourable Members. So, we will hold a series of joint discussions. Indeed, for the knowledge of the House today, we have agreed, as I mentioned earlier, to carry out a Parliamentarian mapping exercise. We will break it down, and we will invite all Honourable Members to take part together in drafting and determining the direction of our foreign policy that is good for our country. So, I think that is all I wish to convey. Although I have much to answer, God willing, I will answer in writing. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Minister. Honourable Members, the question is that the sum of RM809,613,800 for Head B.13 of the Operating Expenditure Estimates 2023 forming part of the Schedule be agreed to. [Question put and agreed to] [Head B.13 ordered to form part of the Schedule]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The question is that the expenditure under Head P.13 of the Development Expenditure Estimates 2023 be approved. [Question put and agreed to] [Head P.13 became part of the Estimates]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The House resumed as Committee of the Whole House. [Committee of the Whole House resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presided

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Tuesday, 21 March 2023.

[The House adjourned at 7.37 p.m.]

Special ChamberSpecial Chamber

[Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Installation of Overflow Lights in Fishing Boat Landing Area Deputy Yang di-Pertua [Dato' Ramli bin Dato' Mohd Nor]: [ReadingSpecial Chamber

salawat] Please, the Honourable Member for Kuantan.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Thank you, Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh, the Honourable Minister.

Mr Speaker, I wish to draw the attention of the Honourable Minister of Agriculture and Food Security to the urgent need to install floodlights at the fish landing areas around Kuantan.

Mr Speaker, we often receive complaints from fishermen in this area regarding cases of theft of boat equipment, including boat engines.

Most fish landing areas are dark, and this condition makes it difficult to detect suspicious activities such as the theft of boat equipment, apart from the safety risks and accidents at the jetty areas.

For the information of the Honourable Minister, there are approximately 950 fishermen across Kuantan. The information we obtained shows two cases of theft of 60hp engines, each valued at RM8,500, and six cases of theft of 40hp engines, each valued at RM6,300. The total losses recorded so far are around RM54,800. This total loss is very large for the fishermen, affecting their livelihoods.

There are several fish landing locations around Kuantan that require the installation of lights for the purposes of safety and monitoring of undesirable activities. These locations include the fish landing centres at

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Kampung Cempaka, Kampung Sepat, Kampung Kuala Penor, Kampung Cherok Paloh and Tanah Putih Baru.

In this regard, I sincerely hope that the ministry can approve the application for installation at the fish landing areas to prevent theft and undesirable incidents. That is all, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

The Honourable Minister.

Tuan Chan Foong HinDAP · PHDeputy Minister of Agriculture and Food Security · Kota KinabaluEN

Mr Speaker, the Malaysian Fisheries Development Authority (LKIM) built a fish landing jetty at Kampung Cherok Paloh in 2010 at a cost of RM 194,642.00.

Meanwhile, at Kampung Cempaka and Kampung Pantai Sepat, no jetty was built because fishermen land their catch directly onto the shore

(beach landing) since those locations are along the coastline.

However, LKIM has taken responsibility by building a fishermen's shed facility at Kampung Cempaka at a cost of RM46,900 in 2013. Meanwhile, at Kampung Pantai Sepat, LKIM built a fish market, a storage store and a surau at a cost of RM 208,511.40.

The list of facilities is as follows, in this table, and I can later forward it to the Honourable Member for Kuantan. In line with the policy directions and development strategy for the fisheries sector issued by the Honourable Minister of Agriculture on 20 March 1982, and also the MTN decision in April 1979, which has...

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Deputy Minister, one moment. I do not have what the Honourable Member is speaking about. I only have the list, and then straight to the closing. So, Standing Order 17 is clear. Yes. I ask the Honourable Member, the Honourable Minister's text. This Standing Order 17 is slightly different from that in the House.

Tuan Chan Foong HinDAP · PHKota KinabaluEN

I apologise. Perhaps what...

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Additions, however, when in the Special Chamber of Parliament, the side of Mr Speaker, must be there.

If I look at what is here, the Honourable Deputy Minister's answer is right after the Schedule, straight to the closing. [While showing a copy of a document] So, it must be expunged. Understand the meaning? It will not be included in Hansard. So, in future. The Honourable Deputy Minister should go straight to the closing section. The Honourable Deputy Minister understands what I mean under the Standing Orders.

Tuan Chan Foong HinDAP · PHKota KinabaluEN

I think the possibility is that the latest draft answer from the office was not sent to the side

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Not sent, meaning there is no related answer concerning that matter. I hold to the Standing Orders. With permission, after the Schedule, straight to the closing. So, if that is the case, let us not waste time. Okay, alright, go straight to 'In this regard' – 'Thus'. Is there or not?

Tuan Chan Foong HinDAP · PHKota Kinabalu

Telah diubah.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

If it was changed, why was the House not informed?

Tuan Chan Foong HinDAP · PHKota Kinabalu

Okey.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please, officers. Standing Order 17, direct to the point. Honourable Minister, proceed with 'In this regard'...

Tuan Chan Foong HinDAP · PHKota KinabaluEN

Okay, this answer has been – there is an additional answer. I think the text is already different. So, anyway, I apologise for the mistake from my office. I just want to get to the landing, the winding-up.

Applications for the purpose of improving existing infrastructure must be submitted either through the nearby Fishermen's Association or the relevant state LKIM before being forwarded to headquarters for the purpose of coordinating allocations. That is all, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Alright, next, the Secretary.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Enlargement of Drains to Overcome FloodingSpecial Chamber

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Thank you, Mr Speaker. I wish to draw the attention of the Honourable Minister to the urgent need to enlarge the drain at Tanah Putih Baru.

For the information of Mr Speaker and the Honourable Minister, when heavy rain falls, there is an area on Jalan Gambang, which is the main route to Kuantan city, that is inundated with water because the small drain has been filled with water. Starting from the Tanah Putih Baru junction up to the Tanah Putih Bridge, a distance of approximately 200 metres.

Usually the situation becomes worse during high tides, when water from the drain completely overflows the road heading to Kuantan city and cannot be passed, and light vehicles have to be blocked. At this time, the route from Kuantan city towards Gambang has to be opened for contra-flow and causes traffic congestion.

Mr Speaker, this matter has dragged on for approximately 15 years.

Observations made by residents and the Drainage and Irrigation Department (JPS) found that the drain is too small, causing the outflow of water to be slow. In addition, the uneven levels of the drain and the main road are also factors causing drain water to overflow onto the road.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

In this regard, I sincerely hope that the ministry can approve or consider this application to resolve the flood problem. That is all, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

The Honourable Minister.

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, the Honourable Member for Kuantan.

First, allow me to extend my highest appreciation and thanks to the Honourable Minister of National Unity for kindly swapping turns with the Ministry of Works, thereby giving me the opportunity to answer the issue raised by the Honourable Member for Kuantan, considering that I need to hurry to the main chamber to follow the Budget 2023 Debate at the Committee stage for the Ministry of Works shortly.

For the information of the Honourable Member for Kuantan, the Federal Road in question is Route FT 02, the Kuala Lumpur–Kuantan Road, 35 kilometres long in the Kuantan district, Pahang Darul Makmur, which is maintained by the Federal Road concession company. The findings of the JKR Kuantan District review show that overflow of water from drains onto road surfaces often occurs, especially during prolonged heavy rain, resulting in flash floods and the road being closed for public use.

For the information of the Honourable Member as well, maintenance of the drains alongside the road involves various responsible parties, among them the Public Works Department (JKR), the Kuantan City Council (MBK) and the Drainage and Irrigation Department (JPS), subject to ownership of the identified asset inventory. For the drains along the Federal Road, most of which were built during road development projects, the main function of roadside drains is designed only to accommodate the surface runoff capacity of the road.

As for monsoon drains, maintenance responsibility lies with the Drainage and Irrigation Department (JPS), whereas for drains located within urban areas and housing estates, they fall under the jurisdiction of the local authority.

Besides that, rapid development is also a cause for the existing drainage system being unable to accommodate the water discharge capacity in the local area. Therefore, this ministry recommends that a comprehensive hydraulic study on the impact of surrounding development be carried out jointly with the relevant agencies and local authorities.

For the information of the Honourable Member, this ministry together with the Public Works Department (JKR) constantly monitors the current condition of the drains and drainage systems located on the Federal Road. Should there be a need to upgrade the JKR drains and the damaged drainage systems, the

Dato’ Sri Haji Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Works · LipisEN

JKR will list the damage in the Road Maintenance Estimate (APJ).

However, the implementation of these planned works is subject to the allocation value approved by the Ministry of Finance, as well as the priority list of works prepared by the Public Works Department based on the assessment of the critical level of road damage for the entire Federal Road network under the supervision of this ministry.

Several preliminary actions have been carried out jointly by the JKR Kuantan District and the Kuantan City Council by repairing broken drains, including cleaning blocked drains to ensure the smooth flow of drain water into the Kuantan River on 19 December 2022 that has passed. However, flash floods of this kind still cannot be avoided, especially during high tides and the Northeast Monsoon, since high river water levels will cause the river overflow to flow back into the drains and subsequently overflow onto the road surface.

For the information of the Honourable Member as well, to ensure the comfort and safety of users on the Federal Road, this ministry has identified drain damage based on the Road Allocation Estimate (APJ) for 2023 under the Non-Pavement Periodic Maintenance Programme to upgrade the drains at the location from their existing size of 600mm x 600mm to a larger size of 1200mm x 1200mm, with an estimated cost of RM1.6 million, to ensure the new drains can accommodate a greater capacity of rainwater, thereby reducing the risk of flash floods. This upgrading work will be carried out by way of a Work Order (AK) to the concession company and is subject to the allocation approved by the Ministry of Finance, as well as the priority list of works prepared by the Public Works Department based on the assessment of the critical level of road damage for the entire Federal Road network under the supervision of this ministry.

For the information of the Honourable Member as well, the appointed concession company is responsible for carrying out routine drain-cleaning maintenance four times a year on protocol roads and twice a year on main roads. Also other routine maintenance works, namely the scope of pavement maintenance, shoulder maintenance, grass cutting, road furniture, cleaning of bridges and culverts, and routine inspections. The concession company is also responsible for carrying out periodic pavement and non-pavement maintenance works implemented by way of Work Orders (AK) based on allocations approved by the Ministry of Finance. The company is also entrusted with carrying out emergency works by taking immediate action should unforeseen incidents occur.

For example, clearing the road after a landslide, preparing a traffic management plan or traffic management plan (TMP), and providing a temporary route to enable vehicles to pass the road.

For the information of the Honourable Member, the Ministry of Works through the Public Works Department (JKR) is always committed to ensuring roads remain in a safe and comfortable condition by carrying out routine maintenance works throughout the year. Thank you, Mr Speaker.

Thank you, the Honourable Member for Kuantan. That is all, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, the Honourable Minister.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Resolution of Housing Issues in Tanjong Tokong, Pulau PinangSpecial Chamber

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

Assalamualaikum. Salam sejahtera. Malaysia Madani greetings. Thank you for giving me the opportunity to deliver a speech in the Special Chamber. So, I wish to draw the attention of the Honourable Minister to matters arising that are often faced by residents of the UDA Flats in Tanjong Tokong, located within the Bukit Bendera Parliamentary constituency in Penang.

As is well known, the Malay village of Tanjong Tokong had already existed as a mukim during the establishment of the city of George Town in 1893. In 1774, land measuring 48 acres was handed over by the state government to the Urban Development Corporation (UDA) at a value of RM 1.00 with a 'special condition restriction' for a leasehold period of 99 years, and the Tanjong Tokong coastal strip measuring 52 acres as early as the 1980s.

From 1974, UDA built 680 low and medium-low cost flats, namely phase 1 with 96 units, phase 2 with 330 units and phase 3 with 254 units, and a police station. The Gross Development Value (GDV) of the commercial development to be carried out on the Tanjong Tokong village is expected to reach RM1.8 billion, as announced by Datuk Nur Jazlan Tan Sri Mohamed – Chairman of UDA Holdings Berhad, on land measuring 8.8 hectares. In addition, UDA Holdings Berhad will also build apartments worth RM165 million to accommodate 1,200 residents of the Tanjong Tokong village, valued at RM120,000 per unit.

It is informed that my side has received complaints from the public regarding housing problems in Tanjong Tokong, Penang as follows:

(i) maintenance problems of increasingly dilapidated buildings, strata ownership status, rental schemes, and restructuring of building management and common property;

(ii) building safety, a level of liveability suited to current conditions, and basic facilities that should be provided;

(iii) redevelopment of the remaining portion of land, which is now to be carried out by UDA Holdings Berhad, which has been delayed or stalled since 2008 contrary to the 'special condition restriction';

(iv) from 2008 until now, there have been changes in terms of the population and demographics of residents.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

For example, homeowners who have passed away, additions to house structures, the existence of houses without numbers, and an influx of residents from outside Tanjong Tokong who rent and at the same time now hold resident status there; and

(v) earlier census data has now become an issue, where with the passing of generation 'A' since 2008, these houses are now occupied by generations 'B' and 'C'.

Honourable Minister, the residents need guidelines on the actions to be taken by the parties concerned, whether by the developer UDA Holdings Berhad or by the government, to ensure a quality of life in line with the vision of the Malaysia Madani family. That is all, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

The Honourable Minister.

Puan Saraswathy a/p KandasamiDeputy Minister of Entrepreneur Development and CooperativesEN

Mr Speaker, first, thank you to the Honourable Member for Bukit Bendera for his concern in raising the issue regarding the level of housing quality in Tanjong Tokong, Penang, my home state.

Before I proceed with the answer, Mr Speaker, I believe there is a typo error in the third line of the question "...pada tahun 1774", I believe it should read the year 1974. Okay, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)

Mohon dibetulkan.

Next, Mr Speaker.

For the information of the Honourable Member, UDA Holdings Berhad, which is an agency under the Ministry of Entrepreneur and Cooperative Development (KUSKOP), was established in 1971 under section 3(1) of the Urban Development Authority Act 1971 [Act 46]. It has the role of developing urban areas from its early establishment until now, and in line with the government's aspiration to balance socio-economics in urban areas and thereby intensify urbanisation as a whole.

UDA's involvement as the implementing agency for the resettlement of the original residents of Tanjong Tokong began in 1972 on an area of 43 acres, where 25 acres have been developed and the remaining 18 acres will be developed as resettlement and replacement houses, affordable houses and medium-cost houses. In 1998, the grant of reclaimed land measuring 54 acres was to offset part of the cost of developing the Tanjong Tokong resettlement.

Up to 2022, UDA has completed 1,486 units of resettlement for the original residents of Tanjong Tokong, covering housing development phases 1, 2, 3 and 4. UDA is currently carrying out development for the remaining 650 families involved, which is expected to be completed within a period of four years.

Almost all of the resettlement housing units at Tanjung Tokong have been given free of charge to the original residents, namely former Temporary Occupation License (BPTOL) holders, eligible children of BPTOL holders and eligible tenants of the housing units.

In this regard, the special restriction conditions apply only to part of the Tanjung Tokong development, involving Phases 1, 2 and 3 only, while the remaining land for the next development is subject to the requirements of the latest development approvals. In line with UDA's role as the implementing agency, several actions have been taken, as detailed below:

(i) between 1985 and 2022, UDA Holdings maintained low-cost flats of 96 units for Phase 1, 330 units for Phase 2 and 210 units for Phase 3 at Tanjung Tokong, with allocations totalling RM14.4 million. Of this amount, RM9.4 million was drawn from UDA Holdings' internal allocation, as total maintenance collections amounted to only RM5.0 million;

(ii) the Penang State Government, through the Land and Mines Office (PTG), Penang State, issued strata title to every affected house owner in 2020;

(iii) UDA implemented a rental scheme beginning in 1985, but it was discontinued in 2002 due to high rental arrears from the tenants concerned;

(iv) in terms of building safety, UDA Holdings obtained assurances from licensed contractors and professional consultants that the existing buildings show no signs of structural weakness;

(v) the housing development also followed the guidelines set by the local authority at that time, in accordance with the eligibility categories of residents for housing units, namely one-bedroom units, two-bedroom units and three-bedroom units; and

(vi) UDA has also provided basic facilities such as a police station, health clinic, shops, surau, community hall, hawker site, kindergarten and others since the buildings were completed in 1985.

In this regard too, several actions are being and will be taken to resolve the related issues involving maintenance, rental and so on, as follows:

(i) UDA Holdings will continue to carry out house maintenance based on existing allocations until June 2023. This is because the residents concerned have not yet established a Management Corporation because

they are unwilling to be involved in house maintenance matters.

In this regard, UDA Holdings is working with the state government agencies to further coordinate matters;

(ii) a discounted price offer of 45 per cent of the value of the house has been offered to 43 house owners who did not pay rent; and

(iii) applications for structural additions to houses, as well as cases involving unit exchanges due to the death of an owner, will be tabled to the Tanjung Tokong Development Planning and Resolution Committee.

Overall, the cooperation of all parties, including agencies and the state government, the Office of the Member of Parliament for Bukit Bendera and residents, is required to work together with UDA, in ensuring that the well-being and quality of life of the community in the areas concerned are always safeguarded, in line with the aspirations of the Madani society. That concludes my reply, thank you, Mr Speaker.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Thank you, the Honourable Minister.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Strengthening Patriotic Spirit in Building a Civil SocietySpecial Chamber

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Please proceed, the Honourable Member.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

Thank you.

I would also like to draw the attention of the Honourable Minister to several issues relating to national unity, namely strengthening the spirit of patriotism in building a Madani society.

Since the 15th General Election took place, our society has often been attacked by certain video clips or links that are racially charged. Issues that are racially charged are a problem that the government needs to address so that the harmony that has been built since our nation's independence is preserved. This is because national unity is the main pillar in building the Malaysian Madani society that we dream of.

For example, videos relating to 13 May 1969 have been re-broadcast on social media such as TikTok, Instagram and so on. Several statements made by former national athletes that contained racial elements were also posted on the social media in question. Such actions can actually paralyse social unity, and if not curbed, they can destroy the unity of our nation's society.

I believe that national unity issues are the responsibility of all ministries and not just the Ministry of National Unity alone. Accordingly, I would like to ask the ministry what plans the ministry has

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

to strengthen national integration among the people of our nation.

At the same time, I would like to put forward several proposals to strengthen national unity and to combat these racial issues.

First, cross-ministry cooperation needs to be enhanced in strengthening national integration. This cooperation enables various programmes and activities to be implemented involving all levels of society regardless of religion and race. Programmes and activities of this kind can provide exposure and the messages that are intended to be conveyed through the concept of Malaysia Madani.

Second, empower the use of social media by uploading content that promotes the concept of Malaysia Madani. The principles or essence that the concept of Malaysia Madani wishes to highlight can be instilled in the people, especially among young people. Third, the broadcasting of patriotic song video clips on television, as was done by RTM in the 1980s. Through such broadcasts, we can nurture and further strengthen the spirit of love for the country among Malaysians. Indirectly, efforts to build the Malaysia Madani nation can be enhanced.

Fourth, empowerment in promoting the Malaysian Future Leader School Programme among students from school level.

Although this programme falls under the Ministry of Youth and Sports, cooperation that crosses this ministry can strengthen racial integration among young people. With this, the government can instil knowledge related to political education and media education as well. I understand that these proposals require support beyond a single ministry.

I hope that all the proposals put forward to tackle and combat this racial issue can be considered by the ministry.

That concludes my speech, thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Just a moment, before the Honourable Minister answers. Secretary, make sure that from now on, this spacing is uniform. There is one space, two spaces, okay. It is fine for the young ones, but these are mature people, the young ones, like me [Laughter]. There must be uniformity so that professionalism is evident. Alright, the Honourable Minister, please answer.

Datuk Aaron Ago anak DagangPRS · GPSMinister of National Unity · KanowitEN

Thank you, Mr Speaker. The Honourable Member for Bukit Bendera. The challenge of managing social unity in this country is not a new matter. Since the 13 May 1969 incident, the government has continuously sought a formula that contributes to social cohesion, establishing political stability and harmonious and united ethnic relations.

Living together in a community of multiple races and religions is not easy in reaching a common understanding agreed upon by all parties. The nation of Malaysia was formed through agreement and mutual understanding among one another through an administration

Datuk Aaron Ago anak DagangPRS · GPSMinister of National Unity · KanowitEN

of government that always ensures the harmony of all its people is guaranteed.

Therefore, Malaysia is known as a unique country with diversity.

However, disputes over race and religion have never ceased.

Disputes among political leaders have become a threat to racial unity. The loud voices of political leaders defending their respective ideologies and interests directly undermine the harmony of society.

Focus needs to be given to economic stability and the development of the people, rather than partisan political agendas.

The National Unity Department, established on 1 July 1969, has been the driving force in building and strengthening the unity of a multiracial society. Then, on 1 July 1972, the Ministry of National Unity was established for the first time but was abolished in 1974.

The government's commitment in addressing the challenges of unity, and in viewing unity as the foundation of social stability as well as the key to national development and well-being, saw the Ministry of National Unity re-established on 10 March 2020.

The Ministry of National Unity (KPN) has taken the initiative to produce several unity policy documents and action plans based on the Rukun Negara and the Federal Constitution to strengthen racial unity in Malaysia, namely the National Unity Policy (DPN), as an umbrella policy and direction for the national unity agenda, with three main pillars, namely patriotism and democracy, national identity and the unity ecosystem. Under the strategy outlined in this policy, the National Unity Action Plan (PTPN) 2021-2030 has also been produced to arrange programmes and initiatives in a specific, holistic and inclusive manner.

Now under the administration of the Unity Government, the concept of Building Malaysia Madani has become the commitment of the YAB Prime Minister of Malaysia and serves as an endeavour that explains the strategy for administering the country effectively. To support the agenda of building Malaysia Madani, the Ministry has produced the Malaysia Madani Unity Framework through the concept of Unity in Diversity.

The flagship programme known as the Kembara Perpaduan Malaysia Madani was launched on 1 March 2023 at the National Museum. The Kembara Perpaduan Malaysia MADANI encompasses three programme clusters based on achieving the objectives of the National Unity Policy through the participation and cooperation of all parties, including leaders, government agencies, the private sector, NGOs, CSOs and the wider society as a whole.

The three programme clusters are:

(i) Semarak Kenegaraan. This is a national programme aimed at increasing knowledge, understanding and appreciation of the aspirations and principles of the Rukun Negara as well as the civilisational history of the nation, to strengthen identity and the spirit of love for the country among all levels of society. For example, this programme includes the Rukun Negara Appreciation Programme;

(ii) Semarak Perpaduan. This is a programme to ignite the spirit of unity among

Datuk Aaron Ago anak DagangPRS · GPSMinister of National Unity · KanowitEN

multiracial, multi-religious and multicultural communities, in line with the concept of unity in diversity.

Examples of this programme are the Unity Week Celebration and many more;

(iii) Komuniti Rahmah. This is a programme designed to build sustainable and compassionate communities, especially in rukun tetangga areas that uphold human values by mutually respecting, loving and appreciating one another, through the mobilisation of the efforts of all parties, namely the Ministry of National Unity, government agencies, the private sector, NGOs and the community. One programme that is quite popular under the Komuniti Rahmah Programme is the Bakul Rahmah Assistance Programme, and we also have tuition and so on.

The Kembara Perpaduan Malaysia Madani programme will have a big impact on all levels of society with a variety of programme content that can strengthen the bonds of goodwill and the unity of a plural society in Malaysia.

The implementation of the Kembara Perpaduan Malaysia MADANI will use a ‘whole-of-government-approach’, namely involving government agencies such as the Ministry of Education Malaysia (KPM), the Ministry of Youth and Sports (KBS), the Ministry of Rural and Regional Development (KKDW), the Ministry of Finance Malaysia (MOF) and so on. Through social media, which is not only popular among young people but also among older generations, and all of which have various applications on their phones.

Accordingly, to promote and publicise the programmes under the Malaysia Madani Unity Framework, the Ministry of National Unity is also not left behind in using social media.

Among the social media used by the Ministry of National Unity are Facebook, Twitter, Instagram and YouTube.

In addition, the Ministry of National Unity also organises a competition for creating creative content with a unity theme using the TikTok application, the ‘Jom Unite TikTok Challenge’. This will attract even more public participation in promoting the national unity agenda.

For the information of the Honourable Member, since the establishment of the Ministry of National Unity, a total of two song video clips have been produced by the Ministry, namely the songs ‘Saya Anak Malaysia’ and ‘Komuniti Sejahtera Bersama’.

The Ministry of National Unity will continue its cooperation with the Ministry of Communications and Digital as well as NGOs to produce patriotic song video clips.

The Malaysian Future Leader School Programme. For the information of the Honourable Member, the Malaysian Future Leader School Programme is a programme under the Ministry of Youth and Sports. However, the Ministry of National Unity always cooperates with the Ministry of Youth and Sports in organising youth-involved programmes such as the Sukan Uniti Programme and programmes under the Rukun Negara Secretariat (SRN) at universities.

Recognising that the Rukun Negara is the basis for the unity of the Malaysian people, on 8 March 2023 during the winding-up of the 2023 Budget at the policy

Datuk Aaron Ago anak DagangPRS · GPSMinister of National Unity · KanowitEN

level, I proposed that the Rukun Negara pledge be recited in Parliament every time the session opens and at the start of each sitting of Parliament.

I also proposed that all official government programmes organised by each Ministry begin with the recitation of the Rukun Negara pledge, as has been practised by the Ministry of National Unity since 2020. Meanwhile, at the school level, students should not only recite the five Principles of the Rukun Negara during assembly, but also be required to read the preamble of the Rukun Negara, namely the aspirations it sets out.

With what is being done, it is hoped that this will become an example and model and an awareness for all citizens of how important unity is in building Malaysia Madani.

Unity Week Celebration. The Unity Week Celebration is one of the main programmes under the Framework for Building Malaysia Madani through Unity in Diversity.

The implementation of the Unity Week Celebration is intended to foster and ignite the spirit of unity among the multiracial citizens of this country. Various programmes and activities have been arranged, including educational programmes, exhibitions, customs and culture, and government agency services.

The Unity Week Celebration will be made an annual event in the national unity calendar and will be carried out throughout the country. This year, the National-level Unity Week Celebration is proposed to be held at the Waterfront Kuching, Sarawak from 20 to 26 May 2023. The Right Honourable Prime Minister has been invited to officiate the launch ceremony scheduled for 20 May 2023.

This week-long celebration will involve the cooperation of various government agencies, NGOs and the private sector to implement programmes according to their respective roles. Thank you.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)EN

Honourable Members, the sitting of the Special Chamber today is adjourned until Tuesday, 21 March 2023, at 2.30 p.m.

[The Special Chamber was adjourned at 3.16 p.m.]