Dewan Rakyat · 11 November 2024
15th Parliament, session 3, meeting 3 · not final · 960 turns · 58,804 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting]
Oral QuestionsQuestions
Oral Answers to Questions. Bismillahi Rahmani Rahim. Assalamualaikum and good morning. To begin the session, I invite Puan Yeo Bee Yin, the Honourable Member for Puchong.
Thank you Dato' Speaker, my question is the first question.
1. Puan Yeo Bee Yin [Puchong] asks the Minister of Energy Transition and Water Transformation to state the status of the Electricity Industry Supply Trust Account (AAIBE): (a) what is the current total fund of AAIBE; and (b) the total arrears not yet settled by independent power producers (IPPs) under the terms of their licences.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera, thank you Dato' Speaker, thank you to the Honourable Member for Puchong. For your information, the total fund of the Electricity Industry Supply Trust Account, or AAIBE for short. The latest figure as at 30 September 2024 is RM866, 686,747.66. Of this amount, RM606,931,000 is in fixed investments. Meanwhile, RM147,872,976.21 is allocated for existing committed projects. For answer (b), the total arrears of the Electricity Industry Supply Trust Account from the period 2018 to 2021 amount to RM442 million. The amount already paid is RM374 million, and the amount in the process of payment is RM68 million. All these electricity generating companies have shown good cooperation and commitment in settling the arrears as well as the contributions for the current year. The ministry also consistently monitors this matter through the AAIBE Committee Meetings, and will certainly hold further discussions with the electricity generating companies concerned to help them settle their contribution payments. That is all, thank you.
Thank you Honourable Minister. Supplementary question, Honourable Member for Puchong.
Thank you Dato' Speaker. I am very pleased to see that we have a large fund in AAIBE. I want to ask, is there any proposal to take a small portion of this fund, for example RM50 million, to be used for incentives for the development of electricity storage. This is because we really need more incentives so that we can incentivize industry players to invest in electricity storage. For example, we can give more tax exemptions or reduce the access charge system for those who have firm power, bringing TBB with firm power. Maybe a 500 megawatt quota for a lower SSC, so that we can use this to push industry players to invest in electricity storage on a large scale.
The Honourable Minister.
Thank you Honourable Member for Puchong. Indeed, according to the trust mandated to the Board of Trustees for this fund, the main area is one of R&D (Research and Development), and whatever Puchong proposes, I will bring it for discussion by the Board of Trustees to see what the focus areas are, and whether the areas proposed just now can be included as part of the contributions for us to develop, especially in the renewable energy sector and so on. This includes storage and energy storage and so on. This is part of what I will bring for discussion, and after the discussion, I will see what the views of all members of the Board of Trustees are. Thank you.
Please, the Honourable Member for Rantau Panjang.
Yes, thank you Speaker. My supplementary question is, there are allegations that the agreements between the government and IPPs tend to favour the IPPs. So, I want to know what has caused the cost of TNB's electricity purchases to increase and consequently affect consumers. So, I want to know whether the government intends to re-evaluate the role and agreements with these IPPs to ensure that the interests of consumers and the stability of the nation's energy supply are guaranteed. I also want to know who is the administrator managing the AAIBE supply trust account, and what is your main focus area in this trust account. Thank you.
Thank you Honourable Member. For your information, our approach is firstly to ensure security of supply, secondly affordability, and thirdly sustainability. These are the trilemma we focus on in the national electricity supply, and that is why, if we look at the establishment of this committee or Trust Board, it is to obtain contributions of 100 per cent from all IPP companies, which receive IPP, and from these contributions. The focus is firstly to carry out R&D, as I said earlier. Secondly, the Human Capital Development Programme, namely to train us so that we will have expertise in the energy sector. Thirdly, the Sustainable Energy Consumption Promotion Programme, as raised by the Honourable Member for Puchong earlier. Likewise, to promote the electricity supply industry directly related to the purpose of establishing this Account Act, and also to approve projects related to what is approved by the Account Committee. If we look at the amended directive of the Electricity Industry Supply Trust Account, its board members consist of the Secretary General of the Ministry, the Deputy Secretary General of the Energy Sector Division, a representative of the Energy Commission, a representative of electricity generators making contributions, a representative of the Independent Power Producers Association, the Senior Principal Assistant Secretary of the Management Sector from PETRA, the Secretary of the Sustainable Energy Division, the Secretary of the Electricity Supply Division, the Deputy Secretary of the New Renewable Energy Section, the Chief Accountant, and the Head of the Electricity Industry Supply Trust Account Unit. These are the members of this trustee committee. So, the focus is that this fund is to be used for development, research and also the programmes I mentioned earlier. Thank you.
Thank you, Minister. Next, the House invites Dato' Haji Mohd Suhaimi bin Abdullah, the Honourable Member for Langkawi.
Thank you, Dato' Speaker. My question number two.
2. Dato' Haji Mohd Suhaimi bin Abdullah [Langkawi] asks the Minister of Education to state the current status of the 1BestariNet project and what legal action has been taken against the company awarded the tender.
Thank you, Dato' Deputy Speaker. Thank you, Honourable Member for Langkawi. For the information of the Honourable Members, the 1BestariNet project is basically an initiative of the Government of Malaysia through the Ministry of Education Malaysia (KPM) to replace and improve the information and communication technology (ICT) network system in schools. This initiative aims to improve the SchoolNet service, which ended on 12 December 2011, by emphasising the first aspect, end-to-end network services, and the second, the virtual learning environment, with permission. The Ministry of Finance, through a letter dated 23 November 2011, agreed to offer the tender for the 1BestariNet Phase 1 services to YTL Communications Sdn.
Bhd. (YTLC). The project was implemented from 13 December 2011 until 12 June 2014 for the Phase 1 contract, 13 June 2014 until 30 June 2016 for the Interim Phase contract, and thereafter, 1 July 2016 until 30 June 2019 for the Phase 2 contract. Throughout the contract period, a total of 9,828 schools were provided with 1BestariNet services. YTLC also erected a total of 2,748 communication tower structures on school premises for the purpose of delivering internet. Among them, 1,143 structures were built on land owned by the Federal Land Commissioner (PTP), and 1,605 structures were built on school premises sites not owned by PTP. The 1BestariNet Phase 2 agreement has already ended on 30 June 2019. However, after the agreement ended, there are still unresolved issues, namely first, the site rental rate for the communication towers, and second, the electricity charges for the 1BestariNet Receiver Integrated System (1BRIS) towers involving the 2,748 communication tower structures I mentioned just now. For the information of the Honourable Members, in 2019, KPM planned negotiations with the company regarding site rental, site rental rates and electricity charges for the 1BestariNet towers. However, the negotiations were postponed because YTLC had already filed an application for judicial review against the Government of Malaysia. Negotiations continued after the company withdrew the application on 5 October 2021, as required by the government. On 17 March 2023, a Cabinet note on the proposed solution to the issues of site rental and electricity charges for the 1BRIS communication towers for the 1BestariNet Phase 2 project and post-1BestariNet was tabled at the Cabinet meeting. At present, KPM is finalising the proposed solution and will submit it to the Cabinet through a Cabinet Memorandum to determine the direction of the solution to this issue. No civil legal action has been filed in court by the government so far. At the same time, the implementation of the 1BestariNet project is still under investigation by the Malaysian Anti-Corruption Commission (SPRM). KPM leaves the investigation entirely to SPRM and is ready to give full cooperation to SPRM in this investigation. Thank you, Dato' Deputy Speaker.
Supplementary question, Honourable Member for Langkawi.
Thank you Dato' Speaker. I asked this second question because I feel quite disappointed, as it seems there is no punishment for companies like these. Because just two years after the 2019 termination, a waste-to-energy project worth RM4.5 billion was handed to YTL. Then, in 2021 also, RM3.46 billion was given to YTL in relation to the multi-lane free flow project. Then there is also the digital banking licence, April 2022
extension of express rail concession 2024, and the total of the figures I obtained is worth about RM6 billion. So, it seems there is no punishment at all.
Honourable Member, question.
That means this matter will proceed as usual. My question to the Honourable Minister is, is there any impact analysis study following the transition of the virtual learning environment platform to Google Classroom and DELIMa as an alternative learning platform option overall. Thank you.
The Honourable Minister.
Thank you, supplementary question from the Honourable Member for Langkawi. Indeed, the 1BestariNet issue arose after this project was awarded back in 2011.
From 2011 until 2019, as I explained earlier, in the contracts that the government at the time had entered into, many problems emerged, including the fact that site rental rates were not finalised and electricity charges were connected from the schools to the company for use by its communication towers. After 2019, although the contract had been terminated, the towers still continue to operate for commercial purposes. This is a legacy issue that must be resolved by the current government. In 2019, the contract ended. In 2023, when this government took over and took responsibility to ensure the issues that arose could be resolved, a Cabinet note was prepared. In the near term, the Cabinet Memorandum regarding both issues, site rental rates and these electricity charges, will also be finalised by the Cabinet. The commitment of the MADANI Government is to ensure these past issues can be resolved, and regarding the investigation by SPRM, we leave it to SPRM to investigate. Regarding the projects that may have been awarded, as mentioned by the Honourable Member for Langkawi, I suggest that the Honourable Member for Langkawi check with other relevant ministries, including the Ministry of Finance, regarding the issues involved, and why the projects were still awarded. Regarding the direction somewhat, as the Honourable Member for Langkawi is aware just now, after 2019 we began with Google Classroom, and after that the DELIMa platform was developed. The DELIMa platform, which today I believe has already provided good benefit and a learning facility in digital education to our children.
[Bangun]
[Bangun]
Thank you, Dato' Deputy Speaker. I support the investigation being carried out so that the parties concerned can be taken action against. Supplementary question: given that the 1BestariNet contract ended in 2019, as informed by the Honourable Deputy Minister just now, and was not extended, what efforts has the ministry taken to ensure that students' digital learning is not affected, in line with the digital education plan? Thank you.
The Honourable Minister.
Thank you, Deputy Speaker. Thank you, Honourable Member for Ledang, for the supplementary question raised. Indeed, after the contract ended in 2019, the main purpose of 1BestariNet was previously to ensure the delivery of internet, that is number one, and number two was to facilitate the virtual learning environment. Those are the two original goals. In 2019, when the 1BestariNet contract was terminated as I explained earlier, we replaced it with a platform developed in-house, with permission, by the Ministry of Education Malaysia. For this DELIMa platform, let me give some information on the details in it. Over these few years, KPM, with the very good development of the DELIMa platform, has placed 789 basic digital textbooks, 12,762 learning videos, and 170 educational radio podcasts that can be accessed free of charge by all students and teachers through the DELIMa platform. These are materials that can be used by teachers and our students in PdP, or teaching and learning. At the same time, KPM's determination to continue our efforts in developing digital education was seen in the launch of the Digital Education Policy last year. In terms of improvements to infrastructure and infostructure, up to the issue of materials and collaboration with strategic partners, KPM indeed gives a commitment to the development of digital education in our country. So, after post-1BestariNet, we have the DELIMa platform, which in the last five years has shown, in my view, a showcase, with permission, of a success that we can mention and also display to our children. Thank you, Dato' Speaker.
Thank you, the Honourable Minister of Education. Next, I invite Tuan Jimmy Puah Wee Tse, the Honourable Member for Tebrau.
Thank you, Dato' Deputy Speaker. My question number three.
3. Tuan Jimmy Puah Wee Tse [Tebrau] asks the Minister of Finance to state whether the government has plans to introduce more policies on fiscal reform aimed at strengthening the nation's finances and strengthening the domestic economy.
Thank you Dato' Speaker. Thank you, Honourable Member for Tebrau. The government is committed to continuing efforts to improve the financial sustainability of the government without jeopardising growth momentum. In 2024, the fiscal deficit as a percentage of GDP is expected to decrease to 4.3 per cent, compared to five per cent recorded in 2023. The fiscal deficit position is projected to continue decreasing to 3.8 per cent in 2025, as tabled in Budget 2025. In the medium term, the government targets a lower fiscal deficit of three per cent, as outlined under the MADANI Economic Framework and the Akta Kewangan Awam dan Tanggungjawab Fiskal 2023 or Act 850. In Budget 2025, the government announced several measures to increase revenue, including a revision of sales tax rates, an expansion of the scope of service tax, and the introduction of dividend tax to broaden the tax base. Meanwhile, to improve spending efficiency, among the measures to be implemented are improving the bulk subsidy programme into a more targeted mechanism. In addition, a special committee will be established to rationalise statutory bodies in addressing overlapping functions, thereby ensuring more efficient and effective expenditure. In the medium term, the government will continue fiscal reform initiatives, including drafting a medium-term revenue strategy (MTRS) to enhance revenue mobilisation and continue phased subsidy targeting to optimise expenditure. The government is also implementing institutional and governance reforms, including improving the Public-Private Partnership (PPP) mechanism as outlined under the Public-Private Partnership Master Plan 2030 (PIKAS 2030). The drafting of new legislation to improve government procurement and strengthen the governance of government-owned companies (SOE) is expected to enhance the credibility and effectiveness of public financial management. The government will continue to focus on implementing strategic policies to strengthen the economy, drive change and enhance the well-being of the people. The introduction of key strategic documents, including the National Energy Transition Roadmap (NETR),
New Industrial Master Plan 2030 (NIMP 2030), the Government-Linked Entities Activation and Reform Programme (GEAR-uP), as well as improvements to the minimum wage, are expected to be able to drive the development of economic and business activities, thereby contributing to the nation's development objectives. In addition, the application of Act 850 will improve governance, accountability and transparency in public financial management. The government remains committed to strengthening the financial position through the implementation of prudent fiscal policies to support economic activities and protect the well-being of the people, in line with the aspirations of the MADANI Economic Framework. That is all, thank you.
Supplementary question, Honourable Member for Tebrau.
Thank you, Dato’ Speaker. Thank you, Honourable Member for Tebrau. The Government is committed to continuing efforts to enhance the government's fiscal sustainability without undermining the momentum of growth. In 2024, the fiscal deficit as a share of GDP is expected to decline to 4.3 per cent, compared with five per cent recorded in 2023. The fiscal deficit is projected to decline further to 3.8 per cent in 2025, as tabled in Budget 2025. In the medium term, the Government targets a lower fiscal deficit of three per cent, as outlined under the MADANI Economic Framework and the Public Finance and Fiscal Responsibility Act 2023 or Act 850. In Budget 2025, the Government announced several measures to increase revenue, including the revision of sales tax rates, the expansion of the scope of service tax and the introduction of a dividend tax to broaden the tax base. Meanwhile, to improve spending efficiency, among the measures to be implemented is the enhancement of the bulk subsidy programme into more targeted mechanisms. In addition, the establishment of a special committee to rationalise statutory bodies in addressing overlapping functions will further ensure more efficient and effective expenditure. In the medium term, the Government will continue fiscal reform initiatives, including the formulation of a medium-term revenue strategy (MTRS) to enhance revenue mobilisation, as well as continue the phased targeting of subsidies to optimise expenditure. The Government is also implementing institutional and governance reforms, including the enhancement of the Public-Private Partnership (PPP) mechanism as outlined under the Public-Private Partnership Master Plan 2030 (PIKAS 2030). The enactment of new legislation to improve government procurement and strengthen the governance of government-linked companies (GLCs) is expected to enhance the credibility and effectiveness of public financial management. The Government will continue to focus on implementing strategic policies to revitalise the economy, generate change and enhance the well-being of the people. The introduction of key strategic documents, including the National Energy Transition Roadmap (NETR),
the New Industrial Master Plan 2030 (NIMP 2030), the Government-Linked Companies Activation and Reform Programme (GEAR-uP), and beyond that, the improvement of the minimum wage, is expected to drive the development of economic and business activities and subsequently contribute to the country's development objectives. In addition, the application of Act 850 will enhance governance, accountability and transparency in public financial management. The Government remains committed to strengthening the financial position through the implementation of prudent fiscal policies to support economic activity and protect the well-being of the people, in line with the aspirations of the MADANI Economic Framework. Thank you.
Supplementary question, Honourable Member for Tebrau.
Thank you. It seems that next year will be a challenging year for the economy and the Ringgit Malaysia in particular, with the election of Donald Trump as the 47th President of the United States, who has a history of strengthening the US Dollar and imposing tariffs on the products of other countries. Indeed, during the campaign, Donald Trump himself announced that he would impose tariffs of not less than 20 per cent on products from other countries. So my supplementary question is, how can Malaysia face or overcome this challenge? Will Malaysia's recognition as a BRICS partner country mean that efforts to de-dollarize will once again become the focus of the ministry? Thank you.
The Honourable Minister.
Thank you, Mr Speaker. Thank you to the Honourable Member for Tebrau. We are indeed aware of the latest developments in the United States. External developments, including political upheaval in the Middle East as well as the outcome of the elections in the United States, have also contributed to the fluctuations in global financial markets, including the Ringgit and the currencies of rapidly developing countries, or, with permission, emerging market currencies. Nevertheless, Malaysia's positive economic prospects, including the Government's commitment to implementing structural reforms, will provide continued support for the Ringgit. The Government will ensure that the Ringgit is traded in an orderly manner. Bank Negara Malaysia will remain ready to contain currency movements considered excessive in the foreign exchange market. The Government and Bank Negara Malaysia have long taken proactive steps to promote the use of local currency for the settlement of international trade and investment. This measure aims to enable more efficient management of foreign exchange exposure, thereby strengthening the country against external factors.
In this regard, the Government and Bank Negara Malaysia have explored opportunities for local currency settlement cooperation with strategic countries such as China, Thailand and Indonesia, as well as other ASEAN countries that have high bilateral trade value. As Chair of ASEAN next year, the Government will continue to lead efforts to further expand the use of local currencies regionally with other ASEAN countries. Regarding participation as a partner country, or, with permission, partner country of BRICS, as a small and open economy, Malaysia cooperates with various parties including the OECD, APEC and, most recently, BRICS. This participation can enhance the country's standing, or, with permission, our standing, at the international level and expand the country's trade opportunities and potential. That concludes my reply, thank you.
Please, the Honourable Member for Merbok.
Most people are keenly feeling the pressure of high cost of living, even though the inflation rate has been reported as low. This cost of living pressure is very heavy for them.
My question is, does the Minister see that the Government's action in introducing various new taxes, raising the SST rate, expanding the scope of the SST including to the logistics sector, and raising the price of diesel, all implemented almost simultaneously, has contributed to the rise in the price of goods and this cost of living pressure? In addition, for the coming period, what is the expected increase in the price of goods and the cost of living for the people when the minimum wage and the price of petrol are raised next year? What strategy has been adopted to increase government revenue without burdening the people, especially in the context of business, diversification, sources of income other than direct tax? This must be the focus of the Government's fiscal reform. Thank you.
The Honourable Minister.
Thank you, Mr Speaker. Thank you to the Honourable Member for this supplementary question. This question is very relevant. The Government fully understands and is concerned about the burden of the cost of living faced by the people, especially in the currently very challenging economic environment. The measures taken by the Government, including introducing several taxes as well as changes to the rates and scope of the SST, are part of efforts to increase national revenue to ensure that national development can continue in a sustainable manner and to strengthen our fiscal position. Regarding the matter raised, we acknowledge that any changes in taxes and prices, especially in vital sectors such as logistics and fuel, can affect the price of goods. However, the Government has adopted a
prudent approach and is considering various mechanisms to minimise the impact on the people's cost of living. These include targeted subsidies such as fuel subsidies, which continue to be enjoyed by the B40 group and several segments of society in need, in addition to special assistance in the recently announced budget. For the coming period, the Government expects that the increase in the price of goods and the cost of living will remain at a controlled rate. However, we do not rule out the possibility of a small increase due to external factors such as global commodity prices and supply chain issues. In this regard, the increase in the minimum wage aims to raise the disposable income of low-income people and thereby help them cope with the cost of living better. The Government also takes proactive steps to ensure that the supply of essential goods is sufficient and prices remain stable, including through cooperation with various agencies to monitor stocks of essential goods such as local rice and packet cooking oil. This effort also involves industry players to increase production and ensure that the supply chain is not disrupted. In short, although these fiscal measures may have certain effects, the Government is committed to weighing the need to increase national revenue while ensuring that the welfare of the people remains a priority. That concludes my reply, thank you.
Thank you, the Honourable Minister. For the fourth question, I invite Dato' Indera Dr. Suhaili bin Abdul Rahman, the Honourable Member for Labuan.
My question, Mr Speaker, question number four.
4. Dato' Indera Dr. Suhaili bin Abdul Rahman [Labuan] asks the Minister of Transport to state the status regarding the plans for: (a) the upgrading of the Merdeka Labuan Port, which is obsolete and whose useful life will end in 2026; and (b) the current status of the development plan for the Labuan Integrated Port on 200 acres of land prepared by the Labuan Corporation.
In the name of Allah, the Most Gracious, the Most Merciful. Peace and blessings of Allah be upon you. Mr Speaker, based on the technical assessment study completed in May 2024 on the structure and fittings of the Merdeka Pier Jetty. The jetty can accommodate current operational demand and needs until 2038. However, maintenance, repair and structural strengthening works need to be carried out given that several structures are expected to experience excessive stress from 2026 to 2028.
In this regard, for the information of the Honourable Members, the Labuan Port Authority has completed maintenance works on the lighting system this year, and the Labuan Port Authority has also completed maintenance action, or, with permission, trestle of the Merdeka Pier Jetty in October 2024. In addition, the Labuan Port Authority will carry out ongoing maintenance action starting in 2025 to ensure the integrity of the Merdeka Pier Jetty structure remains in good condition. Regarding the current status of the development plan for the Labuan Integrated Port on 200 acres of land prepared by the Labuan Corporation: the development proposal for the Labuan Integrated Port is still under consideration by the Labuan Corporation. The Ministry of Transport will take appropriate action to consider the proposal as soon as the application is received. Thank you.
Please, the Honourable Member for Labuan. Supplementary question.
Thank you, Mr Speaker. Thank you, Datuk Deputy Minister, for the answer given. I would like to record my thanks to the Honourable Minister of Transport for his visit to Labuan last Saturday, at which I also attended the briefing given. My question, Mr Speaker, is whether the Government intends to develop a new port since this port is very old? It is more than 40 years old. This structure's integrity can only last until 2026 or 2028, as the Minister answered. As an island with tax-free status since 1956, mere upgrading works are insufficient because Labuan has been a Federal Territory for 40 years, Mr Speaker. The port inherited is still in use until today. Has the Government not seen the need to strengthen Labuan's position as a tax-free island, with a new port that can become a supporting port in Borneo, especially for Sabah and Sarawak, not given due consideration? Second, the construction of a container port or integrated port on this 200-acre land should have been carried out 20 years ago, because the land allocation to this Port Authority was made when I was still Chairman of the Labuan Corporation, since 2000. So, my question to the Honourable Minister of Transport is: does the ministry intend to list this integrated or container port in the Thirteenth Malaysia Plan (Rancangan Malaysia Ke-13), in terms of allocation and also implementation? Thank you, Mr Speaker.
The Honourable Minister to answer.
Thank you, Honourable Member. On the matter of developing a new port, as I said earlier in the original answer, namely that the plan to build the existing port, what is it, over the long term, is what, until 2028, can accommodate up to 2038 with what, what volume there is now, yes. At the same time, strengthening works, strengthening and so on, yes. But because it is also linked to the proposed integrated port, yes, there is, what, over the long term, yes. So, regarding the second question, will it be implemented or not, or has it already been included in the Thirteenth Malaysia Plan? So, perhaps I would like to answer a little about its connection with the takeover of Bintulu Port, yes. Regarding this integrated port, NRES has informed that with respect to the said land, the application for a lease over the land for the development of the Labuan Integrated Port has not been pursued, in order to avoid uncertainty over the assets and liabilities of the Federal Government and the Sarawak Government.
Therefore, a fresh application will be carried out by the Labuan Port Authority after the takeover of the Bintulu Port Authority is completed and Labuan has ─ stands on its own. So, this new application will be submitted again. I think once it stands on its own and has a board and so on, God willing, I think it will definitely be included in the Thirteenth Malaysia Plan. At present, I know it has not yet been included. Once it is completed, it will be included, I think. God willing. Thank you.
Please, the Honourable Member for Kulim-Bandar Baharu.
Okay. Thank you. Because Labuan is no longer under PN, I can answer already. I can ask, right. Alright, thank you. If my facts are wrong, please correct them. As far as I know, Labuan Port was inherited since the colonial era. But what I want to ask is why the revenue of Labuan Port, as I see it, is quite low? For example, in 2022, its revenue was only RM735.98 million. But in 2023, its revenue increased rather sharply, by approximately 56.2 per cent, to about RM1.15 billion. That is a rather successful movement if we look at it that way. But its revenue is still low compared to Westport, Northport or in Penang. Does the Government plan to improve this port to increase its revenue? One more thing, what is the status of the Government's proposal regarding an additional port at Pulau Carey in Banting to reduce congestion at Westport and Northport? Thank you.
The Honourable Minister to answer.
Regarding ─ sorry, YB. I ─ the figures just now, revenue in terms of the form of Dollars and cents. The cents I do not have with me. But regarding the capacity of the trading at Labuan Port. Ship calls at present, only in 2023, only 339 vessels. Cargo handled in tonnage is only 129,932 tonnes. Containers in TEUs last year only 16,376. Indeed it is small. But regarding why the port now, as also asked by the Honourable Datuk Indera earlier, namely about why strengthening needs to be done. All this is so that it can accommodate more. If there are increases. Its strengthen wharf is for the purpose of ensuring it can bear the load, more, many more containers or others, to be able to accommodate the existing port. A question that deviates a little about Pulau Carey. That day, our Right Honourable Prime Minister officiated the groundbreaking for the extension of Westport at Pulau Carey. Thank you.
[Question No. 5 – the Honourable Mr Chong Chieng Jen (Stampin) was not present]
Alright, thank you. For the information of the House, question number five, for the Honourable Member for Stampin, we skip it. Because the Honourable Member for Stampin is attending the State Legislative Assembly (DUN) sitting in Sarawak on the same date. We move to question number six. Only the Honourable Member for Jelutong ─ one moment. The Honourable Minister has applied to answer together with the earlier question. But with that, it does not cancel the Honourable Member's right to two questions. Maybe it can be modified, right. Please, Honourable Member.
Thank you, Deputy Speaker. Before that, I would like to thank the Deputy Speaker. I saw on TikTok that the Deepavali celebration of Cameron Highlands Parliament was very lively. I would like to say many thanks. Although there are not so many people in Cameron Highlands Parliament, I was very touched by the lively celebration organised by the Deputy Speaker. Indeed, the Deputy Speaker is a Member of Parliament with a people's heart. Congratulations and happy Deepavali. Deputy Speaker, I would like to try to ask my question with a pantun. Although not as clever as the Honourable Member for Pontian, I try with a pantun. A man does not tolerate being challenged, Advice: while Pendang is being planted, Jelutong has been patient enough, My question is number six.
6. Tuan Sanisvara Nethaji Rayer a/l Rajaji [Jelutong] asks the Minister of Transport to state the measures being taken by the Ministry of Transport to overcome all the problems faced by Malaysia Airlines (MAS), because recently there have been many complaints, grievances and grumbles regarding the deteriorating service performance of MAS.
Thank you, Mr Speaker. Thank you to the Honourable Member for Jelutong. Perhaps I am not late either. It is not yet too late to personally convey happy Deepavali to YB Jelutong.
Okay, Deputy Minister. The Deputy Minister is indeed also a person with a people's heart. Thank you.
Thank you. Mr Speaker, I seek permission to answer the Honourable Member for Jelutong together with the Honourable Member for Saratok and the Honourable Member for Beluran dated 20 November 2024, the Honourable Member for Padang Serai dated 26 November 2024, the Honourable Member for Setiu dated 2 December 2024, the Honourable Member for Putrajaya dated 5 December 2024, as well as two questions from the Honourable Member for Rompin dated 2 and 5 December 2024, because the questions concern the same issue. For the information of the Honourable Members as well, questions relating to aviation and Malaysia Airlines Berhad were also answered by me during the Oral Question Time session on 28 October 2024 and during the winding-up of the 2025 Budget debate by the Right Honourable Minister of Transport on 6 November in this august House at the policy level. Mr Speaker, perhaps I ask for a little more time.
Silakan.
Because a lot of all this has been gathered together.
Silakan.
Mr Speaker, the Ministry of Transport takes seriously and is concerned about safety aspects and matters of safety in ensuring that the growth of the aviation industry is in line with compliance with the established safety standards. One of the strategies to restore passengers' confidence in Malaysia Airlines is based on the results of the on-time performance (OTP) report of the Malaysia Aviation Commission (MAVCOM). In April this year, MOT and MAVCOM set a target of 85 per cent OTP and 80 per cent of flights adhering to schedule at all times for Malaysian airlines operating from Kuala Lumpur International Airport Terminals 1 and 2; and at the level covering international airlines and other domestic airports, apart from KLIA. The performance results of the airlines are published on the MAVCOM website. MAVCOM plans to expand the publication of airline performance for
including departures from other airports in Malaysia as well. Since MAB's announcement of its flight network at the end of August last year, the measures taken have shown positive results for its OTP. MAB's OTP has risen from 58.2 per cent in August 2024 to more than 80 per cent in October this year. To strengthen aspects of aircraft maintenance, MAB has taken several comprehensive measures as follows. Temporarily cancelling several domestic and international flight networks. This cancellation of flight networks is necessary to ensure the long-term resilience of the aircraft and the reliability of its operations. This temporary cancellation of flight networks will allow more proactive maintenance to be carried out on the aircraft, reduce the risk of aircraft damage and provide the best flying experience for customers. This decision is also to ensure that MAB's safety standards are not only maintained but strengthened. MAB has also carried out a thorough investigation of the current technical issues by identifying and rectifying the causes, and improving maintenance protocols and procedures to ensure that the prescribed safety standards can be achieved.
All troubleshooting steps, with permission, needed to isolate the faults are being carried out using the latest approved aircraft maintenance manuals. In this regard, MAB has used modern technology in preventive and predictive maintenance to anticipate and address issues before they become critical. MAB is also working closely with aircraft and engine manufacturers and the relevant supplier networks to address supply chain and technical issues. In addition, MAB is also focusing on enhancing training and recruitment of staff to address the increasing demand and the complexity of modern aircraft. Collectively, these measures are being taken to restore passenger confidence and to ensure safer flights that are more trusted by passengers. For the information of the Honourable Member as well, the Civil Aviation Authority of Malaysia (CAAM), as the Federal Statutory Body responsible for the technical regulation of the nation's civil aviation, has increased monitoring and carried out investigations into any incidents involving aircraft operated by Malaysian airlines. CAAM carried out an investigation and surprise audit of MAB's airline, including MAB Engineering Services (MABES), which is responsible for the maintenance of MAB's aircraft, from 24 June to 28 June 2024.
Based on the findings of the investigation, among the significant issues contributing to several technical incidents involving MAB aircraft is possibly due to mechanical component problems and a shortage of skilled workers needed to carry out aircraft maintenance work, and to improve the level of effectiveness of the systems, quality management and safety management systems by MAB airline and MABES. Therefore, to identify improvement actions arising from CAAM's surprise audit findings, MAB has prepared a mitigation plan. Among them is to raise the level of aircraft safety to an alert level so that focus can be given to aircraft reliability. At the same time, MAB has also carried out the process of procuring new aircraft as one of the strategies to increase passenger confidence in the airline, besides ensuring sufficient aircraft availability to meet scheduled flight requirements. For the information of the Honourable Member as well, based on CAAM's latest audit of MAB, the renewal period of the Air Operator Certificate (AOC) will be reduced from three years to one year only, from 1 September 2024 to 31 August 2025. Therefore, airlines need to go through more frequent auditing processes before their AOCs are renewed. This will ensure that MAB is more alert and takes appropriate improvement actions as the mitigation plan submitted by CAAM. CAAM will continue monitoring and carrying out safety audits on all aircraft owned by airlines operating in the country to ensure that safety aspects and safety management are complied with appropriately. This ministry also stresses that the government will not compromise on matters involving the safety of air passengers. The government, through the Right Honourable Prime Minister, has stated its commitment to ensuring the success of MAB as it is the national airline and must return as the nation's main airline. Thank you.
The House invites Tuan Sanisvara Nethaji Rayer a/l Rajaji, Honourable Jelutong, for a supplementary question.
Thank you, Deputy Speaker. I have listened attentively to the explanation given. Firstly, I would like to record my highest congratulations and thanks to the Deputy Minister, the Minister and the ministry for all the efforts taken to further improve the quality of Malaysia Airlines' service. However, Deputy Speaker, what often happens now is that when we go to the airport, after arriving at the airport, we are informed that the flight has been delayed, and sometimes the delay is not just one to two
hours but can also extend to about five to six hours. Imagine that, and the fares are so high. I note, Minister, Deputy Minister and the government have informed that if such a delay occurs, there are conditions under which the airline must refund the flight ticket fare to passengers. My question is, is there any time limit set so that the money is refunded automatically to the passenger? This is necessary. If it is not refunded, the passenger has to make a claim, appoint a lawyer, go to the consumer association and so on. This is the question I wish to raise. Can the government ensure that if there is such a delay, exceeding three to four hours, the money must be refunded to the passenger automatically within a short period. Thank you, Deputy Speaker.
The Honourable Minister, for your reply.
Thank you, Mr Speaker, thank you Honourable Jelutong. So regarding this delay, we are indeed aware that this happens. So as for the payment, I think in – I don't have the details with me here in detail, but there is already something related to credit shell and also MAVCOM is also drafting on how the method to refund or the action on how to ensure this matter does not become a cancer, and the action taken is that MAVCOM is implementing the actual action. Just that I don't have the detail about the matters mentioned, but it is indeed being implemented and, if we look at the reply during the winding-up, it was also stated by the Minister in detail, yes, on the 28th. So, to say it here again, to be honest, I don't have the details with me. I don't want that what I said earlier is different, and what I say now is different. So, I promise you we will give you our answer on the 28th and during the winding-up it is consistent, I will answer this question with a written reply. There are indeed things that have already been implemented. Thank you.
Thank you, Deputy Minister.
Alright, next, this side. Please, Honourable Member.
Thank you, Honourable Member.
Jerantut.
Jerantut, yes. Perhaps you could refer to the Malaysian Aviation Consumer Protection Code, which sets out in detail what action customers can take when there are changes and so on.
Honourable Jerantut, Honourable Jerantut is not a Minister.
My question is...
Tanya soalan.
Yes. My question is, if we look at the Malaysian Aviation Consumer Protection Code, it focuses more on the actions for us as consumers to obtain something from airlines when there is a delay or postponement of a flight. My question is, is there any punitive action other than us imposing the reduction of the AOC from three years to one year? Is there a heavier punitive action against airlines that are incompetent in flight management, which causes technical problems on our flights, and as was mentioned earlier about the audits carried out, the shortage of expert and skilled personnel in the maintenance of our aircraft, our fleet. So, what are the short-term actions to resolve this problem? Thank you.
Please, the Honourable Minister of Transport.
Thank you, Honourable Jerantut. Regarding recruitment of skilled workers, the actual situation at the moment is that MAB has already recruited, offering recruitment of skilled talent from within our own country from companies that are related to aviation to help, not the fresh graduates. Those who are already skilled are also among the methods to ensure we are not short, because those who have experience are taken to ensure the level of skill is not, as people say, must be the same as before. So, all this is taken from outside, to address this shortage problem.
At the same time MAS also strives, MAB, to train new workers, to ensure we do not run short of these things. But as I said earlier just now, with permission, MAB has recruited and offered, offer, to skilled talent outside there in our country, who previously, due to COVID, many have left. But they are already in other companies. Already in other companies, but MAB is also trying how to attract back skilled talent that is in this country, who previously in – apart from those who left the country, that is different, but those who are in the country. This is one of their efforts to address this shortage of skilled talent in addition to new training. This offer is also, apart from within the country, also offered to any talent that is needed, truly needed, from outside the country. So, regarding that punitive matter, MAVCOM has indeed drafted, yes, how the methods are to address this matter as I answered earlier too,
for the earlier supplementary question, there is indeed. Just that I don't have the detail, later, God willing, we will answer in writing so that there is consistency in our answer. We do not want to say one thing that day and something different today. I want to be consistent. Thank you.
Dato’ Speaker.
Thank you, Honourable Minister.
Dato' Speaker, with permission if possible.
Peraturan?
No, not a rule. However, since this matter is extremely important, we consumers who are quite affected by the impact of the scheduling, and citizens from Sabah in particular and Sarawak because of...
Honourable Member, Honourable Semporna.
With your permission, if I may.
If I start by allowing the Honourable Semporna, I must allow the others as well. So we follow...
Tidak apa, tidak apa. Saya minta sahaja, saya merayu kalau dapat. Kalau tidak dapat, tak jadi masalah sebab you have the right to do that.
Thank you, Honourable Semporna, for understanding. Next, I invite Dato' Haji Abdul Khalib bin Abdullah, the Honourable Member for Rompin.
Thank you, Dato' Speaker. My question is number seven.
7. Dato' Haji Abdul Khalib bin Abdullah [Rompin] asks the Minister of Digital to state, with the rapid growth in the use of artificial intelligence (AI) technology in Malaysia today, what assurance the ministry has to ensure that codes of ethics and personal data privacy protection can be controlled against leakages.
Thank you, Mr Speaker. Thank you to the Honourable Member from Rompin for raising question number seven. Mr Speaker, following the high potential and high adoption of artificial intelligence (AI) technology in Malaysia, this ministry has drafted and implemented various initiatives, including the establishment of the National AI Office (NAIO).
The office, which will regulate the development of AI in Malaysia and lead initiatives that harness AI to strengthen the digital economy, improve public services and contribute to sustainable development. Mr Speaker, this office is the main organisation that will monitor the implementation of AI technology by sector in the country to ensure all aspects are well protected from any threats and improper misuse. In the same vein, Mr Speaker, to provide an environment and an ecosystem that supports the responsible and ethical design and development of AI, the Ministry of Science, Technology and Innovation (MOSTI) has already launched the Artificial Intelligence Governance and Ethics (AIGE) Guidelines on 20 September this year. These guidelines have also been refined by the Ministry of Digital by looking at the AI ecosystem as a whole, covering developers, service providers, users and policymakers related to AI, so that they comply with social and ethical values and existing policies to ensure AI technology is used for the public good without neglecting human rights and individual security. Furthermore, Mr Speaker, apart from the enforcement of the amendment to the Personal Data Protection Act 2010 which was gazetted on 17 October last, to improve governance relating to personal data protection in Malaysia, this ministry, through the Personal Data Protection Commissioner, is also developing seven guidelines, and three of them are directly related to AI technology, namely: (i) Guidelines on Data Protection Impact Assessment (DPIA); (ii) Guidelines on Privacy By Design (PBD); and (iii) Guidelines on Automated Decision-Making (ADM) and Profiling. All these guidelines can, Mr Speaker, be used as reference documents by data controllers in Malaysia, taking into account the rapid advancement of AI technology, which is a technology that is highly dependent on high data processing. Mr Speaker, the ministry will also continue to forge strategic collaboration across the public and private sectors so that personal data leakage incidents can be minimised in the future, through the implementation of various initiatives, including the organisation of AI literacy programmes, the development of a regulatory framework and the AI Technology Action Plan for 2026 until 2023.
All these efforts are able to ensure that all stakeholders are better prepared to deal with any undesirable incidents. That is all, thank you.
Supplementary question, Honourable Rompin.
Thank you, Dato' Speaker. Thank you, Honourable Minister. My supplementary question is, how does the government plan to overcome the issue of personal data leakage involving AI technology? Does the government intend to enact a specific law related to AI, given the very large influence of its effectiveness and implications on all fields and industries globally today? I give an example, AI can now produce moving pictures of individuals who have passed away and mimic their voices with almost one hundred per cent similarity. There are many negative implications. If not controlled, it has the potential to have a bad effect on the country and the people. Thank you.
Please, Honourable Minister.
Thank you, Honourable Member, for the question raised just now. Honourable Member, if we look at emerging technology as you have just mentioned, there are indeed many new things that we see and they also cover matters of personal data. So I agree, that is something we need to scrutinise and see how we can. If it is necessary to draft laws or standards that need standards and so on, these are matters we must look at. That is why we have a National AI Office. One of its tasks is for us to launch a study on what the challenges really are that we will face through this AI technology and emerging new technologies. If it is necessary for us to upgrade existing laws so we can address those challenges, or if it is necessary for us to enact new laws for that purpose. So, the question raised is a very important question. Honourable Member, thank you, yes we are indeed aware of these matters. There are also other countries regionally and globally that have already looked at this specifically. We, after launching the AI office next month, will look at the need to enact laws or establish the standards needed to address that situation. Thank you for that question.
Honourable Pulai.
Thank you, Deputy Speaker. Thank you, Minister. In AI decision-making, it depends on the big data that exists within
that environment, yes. It means that if the data we input is correct, then the results obtained by AI are also correct. This means that we need to increase this correct information within this big data. So my question is, to what extent is this initiative being implemented to ensure that information that is true and authentic is included within their environment. Thank you.
The Honourable Minister.
Thank you, Mr Speaker, a very pertinent question from Pulai. Yes, that's right. When we look at technology today, especially technology that requires information, and I think Pulai is referring to technology involving LLMs, where we ask a few questions and it gives answers like ChatGPT and so on. So his question: the answers given are the result of the data we put into what is called the language model. So we want to ensure that the answers given are grounded in or based on accurate data. So the question that arises is whether or not the data put into the language model is accurate data that we can trust. So, several approaches have already been taken. One of them is to look at whether, if we can govern it at source, Mr Speaker.
What he means is that, before we input any data, we make sure that it is accurate data, that it is authentic data, with permission. Then, in that condition, we can ensure that the products or content issued afterwards are content we can trust, accurate content. But that is one approach. Another approach is that we input all the data, then train the module, and see how we can ensure that the data input into the module is accurate data. So this is something we have to look at, and some months ago we already proposed that we would set up what is called a Data Commission. So, its purpose is to look at problems of this kind, Honourable Member for Pulai. I think moving forward, this will be a very important aspect. And we have to look at how we ensure, especially if we look at government information issued by ministries and so on, that we want to ensure the information we obtain from these sources is complete information and also accurate information. So, we have to look at how we can establish measures or standards to ensure that any products based on
language models can convince us that the data used is valid and accurate. But indeed, this is something we see, Mr Speaker, once again showing how necessary it is for us to look at emerging technology, new technology, because we are moving forward, as raised by Rompin earlier. We also have models that can create images, voices and so on. So, we need to look at these matters carefully. The establishment of NEIO will also look at these matters and the need for certain laws or standards so that at all times we can be confident in the data we receive. That is all, thank you, Pulai.
Alright, next the House moves to question number eight. I invite Mr Lee Chean Chung; the Honourable Member for Petaling Jaya.
The Cameron rose is lovely in the garden, Its fragrance wafts and captivates the heart, Thankfully Petaling Jaya has not been forgotten, Now comes my eighth question.
8. Mr Lee Chean Chung [Petaling Jaya] asks the Minister of Education to state the plan to elevate STPM as the main pre-university programme for government scholarship recipients such as those from JPA and MARA, for undergraduate study abroad.
Thank you, Dato' Deputy Speaker. Thank you, the Honourable Member for Petaling Jaya, for the eighth question. Form Six is one of the pathways for holders of the Malaysian Certificate of Education (SPM) to continue their education at higher education institutions, whether overseas or in Malaysia, alongside other post-secondary programmes of the Ministry of Education Malaysia (KPM) such as the Matriculation Programme, the Bachelor of Teaching Degree Programme, the Malaysian Higher Religious Certificate and the Sports School Pre-University Programme. To attract SPM leavers to continue their studies in Form Six, KPM has already implemented a rebranding of Form Six education through the Malaysia Education Development Plan 2013–2025. Through this rebranding, KPM has implemented several strategies and reforms to strengthen Form Six education in order to attract SPM leavers to continue their studies in Form Six. Looking back, in 2014, KPM issued Professional Circular Letter No. 2 of 2014: Dress Code for Form Six Students, which stipulated that Form Six students are permitted to wear smart casual attire when attending classes or activities outside the classroom and activities outside the classroom.
In addition, KPM has also issued Ministry of Education Malaysia Circular Letter No. 11 of 2016: Form Six Management Guidelines, which permits the use of electronic devices by Form Six students. For the information of Honourable Members, KPM also made changes to the school system and assessment by introducing a modular system to replace the terminal system. Both myself and the Honourable Member for Petaling Jaya used the terminal assessment system, just once. So, now we are introducing the modular system, and through this system, the course content has been divided into three semesters, namely semester one, two and three. The rebranding of Form Six also saw the STPM examination divided by semester, where students sit for STPM at the end of each semester. STPM also uses the Cumulative Grade Point Average (CGPA) system in determining overall STPM results, the same as other pre-university programmes. In terms of recognition, STPM is equivalent to A-Level and is recognised by the University of Cambridge, which is one of the world's leading universities. Therefore, STPM is also recognised by all universities in Commonwealth countries and most of the world's leading universities. STPM leavers who obtain excellent results and meet the requirements are also eligible to apply for scholarships under JPA, Majlis Amanah Rakyat and other scholarships provided by other government agencies. Form Six is also the only post-secondary institution with the largest number of study centres, with a total of 635 Form Six centres across the whole country. Through the rebranding of Form Six in 2013, the operation of Form Six was introduced, namely mode one, two and three. From 2016, mode one was renamed Form Six College through KPM Circular Letter No. 6 of 2016. So far, a total of 27 Form Six Colleges have been opened across the country. KPM constantly reviews and improves the existing system from time to time. KPM is studying the proposal to establish Premium Form Six Colleges through cross-collaboration with the Ministry of Higher Education. The collaboration between KPM and KPT is a continuing commitment of both ministries to strengthen and make Form Six the main educational pathway of choice for SPM leavers to continue their studies. That is all, thank you, Dato' Speaker.
The Honourable Member for Petaling Jaya, supplementary question.
Thank you, Dato' Speaker. The reason why STPM is not the main choice of students now is because many think that Matriculation provides more assurance of university admission, and the failure rate is also considered higher for those who take the STPM examination.
So, in view of all these negative public perceptions of STPM, does the ministry have a plan to promote STPM more effectively to students and parents as the main choice for pre-university study, especially for study overseas? And then, is there a plan to integrate Matriculation with STPM so that they are on the same footing? Thank you.
The Honourable Minister.
Thank you, Dato' Deputy Speaker, thank you, the Honourable Member for Petaling Jaya. KPM takes note of the concerns and also the negative views that have been raised by the Honourable Member for Petaling Jaya just now. However, in terms of statistics and facts, I need to provide some information regarding the pathway for our children in Form Six to further their education, especially at public universities. In the past three academic sessions, Dato' Deputy Speaker, based on statistics when we compared the intake statistics of our children from STPM Form Six to public universities provided by KPM. For the 2021–2022 academic session, the percentage of Form Six students who were able to continue to public university level was 66.85 per cent. For the 2022–2023 academic session, the percentage of Form Six students who were able to continue their studies to university level was 67.87 per cent. For the 2023–2024 academic session, it was 68.03 per cent.
[Bangun]
Indeed, KPM set a target after the reforms and strengthening were made: we aim to one day achieve an intake into public universities of 80 per cent. Regarding promotion programmes for STPM to parents and our children, these programmes are indeed being actively implemented, and the Form Six Plan 2024–2030 has been developed by KPM, and among them we have several initiatives and strategies. Among those that we have already been able to implement is granting principals autonomy for admission appeals.
Principals at Form Six Colleges or at Form Six Centres have the autonomy to determine and make decisions on all appeal cases for entry into Form Six. This is an effort to help our children who are determined and aspire to enter Form Six but were not given the opportunity to enter at first. Finally, Dato' Speaker, regarding the proposal from the Honourable Member for Petaling Jaya on whether KPM has studied integrating both Matriculation and STPM. KPM takes this issue and this view with a very serious attitude.
For the information of the Honourable Member for Petaling Jaya, in the past few months, KPM has indeed been making efforts to study the proposal to hold a single entry exam for our children from Matriculation and STPM graduates. However, at present we do not yet have a final decision, and KPM is only committed to ensuring that our children, whether from Matriculation or STPM, have a bright pathway for further study. Thank you, Dato' Speaker.
Please, the Honourable Member for Pekan. Pasir Salak.
Yes. Pasir Salak. Alright, thank you, Dato' Sri Speaker, the Honourable Deputy Minister. The question from Pasir Salak is: what is the Ministry of Education's plan in studying special pathways to increase the number of outstanding Form Six teachers, which is currently recorded at 60 persons or 0.5 per cent of the total Form Six academic teachers? Thank you.
The Honourable Minister.
Thank you for the question from the Honourable Member for Pasir Salak regarding teachers in teacher management or teacher quality for Form Six. Indeed, under the Form Six Plan 2024-2030 that has been developed, one initiative concerns the management of student and teacher welfare, and another is the improvement of the quality of Form Six education graduates. For our teachers who teach or are engaged to teach in Form Six classes or Centres, KPM has always given serious attention, and that is also why, since 2016, Form Six Centres in Mode 1 have been developed into Form Six Colleges. In 2016 we had 10 Form Six Colleges. As of this year there are 27, and under the Form Six Plan 2024, we are targeting by 2030 to develop and have a total of 67 Form Six Colleges. That is all, thank you.
We move to the ninth question. I invite Mr Mordi Bimol, the Honourable Member for Mas Gading.
Thank you, Speaker. My ninth question.
9. Mr Mordi Bimol [Mas Gading] asks the Minister of Higher Education to state the types and number of fraud cases involving private higher education institutions that have been acted upon by the authorities since 2019 until now, and what enforcement measures have been taken to ensure such fraud does not recur.
Thank you, Dato' Speaker. Thank you to Mas Gading for the question that has been given. Dato' Speaker, the Ministry of Higher Education (KPT) always strives to ensure that the operation of private higher education institutions (IPTS) registered under the Ministry of Higher Education comply with the Private Higher Educational Institutions Act 1996 [Act 555] and the regulations in force under it, through periodic inspections. If there are findings of non-compliance in the operation of IPTS with Act 555, follow-up action will be extended to opening an investigation paper and then taking prosecution action in accordance with Act 555 if found guilty. From 2019 until 2024, based on complaints of non-compliance with Act 555, compliance audit inspections were carried out on 355 IPTS, and during that period a total of 146 investigation papers were opened against IPTS by KPT through the Department of Higher Education based on complaints received. Based on the total number of investigation papers that have been opened, a total of 82 cases were subject to compound action. Among the offences commonly committed by IPTS under this Act 555 are as follows: (i) section 15. IPTS made changes to company particulars without the approval of the Registrar General. For this one, 12 compound notices have been issued; (ii) section 28. IPTS operated at unregistered premises under Act 555. 12 compound notices were also issued; and (iii) section 81. Teaching staff teaching at IPTS did not have a teaching permit approved by the Registrar General. For this one, 47 compound notices have been issued. In summary, this ministry indeed takes any issue involving IPTS seriously. If members of the public have any complaints related to IPTS, complaints can be channelled through the Public Complaints Management System (SiSPAA) for further action by the ministry. That is all, thank you.
Supplementary question, the Honourable Member for Mas Gading.
Thank you, Speaker, thank you, Minister. My supplementary question is: what is the ministry's strategy to help students who fail to obtain PTPTN or PTPK loans to continue their studies? Because there is a case I received recently, where the student was forced to take an outside loan. Second, what is the ministry's action against higher education institutions that accept and take in students who are clearly not eligible in terms of their academic results, to continue studying and obtain loans, but whose certificates are not recognised. Second, there is also a case of being able to continue studies,
obtaining a loan but failing to complete the studies, and then owing PTPTN. So, many of the victims of these cases are students in rural areas. So, I seek clarification from the ministry.
The Honourable Minister of Higher Education.
Okay, thank you for the supplementary question, Mas Gading. This indeed is one of the serious matters that is being studied by the ministry. According to our records in 2023 at public universities alone, a total of 593,101 students registered, and eventually 24,296, or 4.1 per cent, dropped out and were unable to complete their studies. As a result of the study, one of the reasons is what Mas Gading mentioned earlier, that they were unable to pay fees and also financial problems. Therefore, KPT, we have several schemes that we offer to these students. I ask these students to contact their respective Student Affairs Divisions. Among them is the Sulung Programme, as I often mention, this Sulung Programme is for first-born children, especially the B40 group. Just make sure their CGPA is 3.0 to qualify. This is for the first child in a family who has just entered university, and apart from that we have the Perkasa Siswa Foundation that we established in 2021, and this will manage student welfare in various forms of assistance. Recently we also gave computers to students whom we identified, and one-off assistance to students who are really in need and also the needs of students with disabilities. So, in other words, in this ministry we try to ensure that no students are left behind. And regarding what was mentioned about the ministry's action against any students who are not eligible but were still accepted. IPTS registered with and under KPT must obtain approval from the Registrar General before offering courses of study, with the conditions stipulated, including the admission eligibility requirements for students.
If there is a complaint that a registered IPTS has admitted students in breach of the conditions, it is an offence under section 40 of Act 555, and for 2024, a total of 28 compound notices were issued to IPTS for this offence. Okay, thank you.
Please, the Honourable Member for Maran.
Thank you, Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera. Minister, I want to know what are among the reasons for the fraud experienced by private IPTs and perhaps also public ones, or is it because these IPTs face debts that force them to rely on other parties? In the end, they are cheated?
[Mr Speaker presided over the Sitting] I would also like to know, if possible, this supplementary question. What is the total amount of debts faced and borne by these private IPTs and also public ones, and with which parties do they owe? What steps can the government or the ministry take in helping these private IPTs and also public ones? Thank you.
Sila Menteri.
Okay. Thank you to MP Maran. As I mentioned earlier, among the things that often become problems for IPTS, especially, is that when they do not make changes when there are changes to company particulars, they do not inform the ministry or the Department of Higher Education. There are also those that do not operate at registered premises, and teaching staff who teach do not have teaching permits. Only in terms of the details of what problems have occurred, where they owe debts and how to resolve these matters, I think that is rather detailed...
Bertulis ya.
...the statistics. I will answer in writing later.
Terima kasih.
Thank you, MP Maran.
Alright, Honourable Member. Now the session for Oral Question Time today has ended. Minister, please. [The Question and Answer session for Oral Replies ended]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, "That, in accordance with Standing Order 12(1), I respectfully propose that the Sitting today shall not be adjourned until the completion of the turn of the Ministry of Women, Family and Community Development as listed at number 22 in the order of turn of Honourable Ministers replying to the debate on the Budget 2025 at policy stage that has been circulated, and after that the Sitting shall be adjourned until 10 a.m. on Tuesday, 12 November 2024." Thank you.
Thank you, Minister. Is there anyone who supports?
Yes, Mr Speaker. I support.
Alright. Honourable Member.
Yang Berhormat.
Now I open the floor...
Honourable Tan Sri. Standing Order.
Okay. Why not let us settle this one first. After that, we will hold the sitting. Alright. Honourable Members, now I put the question to the House for decision. The question is that the Motion as moved earlier be agreed to.
[Motion put for decision; and agreed to]
Yes, Kota Bharu.
Thank you, Honourable Tan Sri Mr Speaker. I would like to refer to Standing Order 36(12).
Okey.
Which reads, "Any Member who makes a statement that misleads the House shall be deemed to have insulted the House, and that Member may be referred to the Committee on Rights and Freedoms for that offence".
Saya.
Honourable Tan Sri, to facilitate my presentation, I seek permission to give this reference document to the Honourable Member.
Baik.
May I request. [Handing over a copy of the document to the Bentara]
Silakan.
Exhibit one. [Laughter]
Okey.
Honourable Tan Sri, I would like to refer to the Hansard of this august House. On 6 November 2024, which was last Wednesday, during which the Honourable Minister of Law and Institutional Reform wound up the debate on the Budget 2025, and I took part in that debate by interjecting on the winding-up. I would like to refer to the Hansard beginning on page 42, which I have marked. I highlight the page. I seek permission to read it, "Dikatakan...", this is my speech, yes, "It is said there is an addendum stating that the pardon involves an alternative detention, namely detention at home. Now, this issue, I want to ask the Minister, this is the time,
whether this addendum exists as stated in the affidavit of the Honourable Bagan Datuk and also the Honourable Menteri Besar of Pahang that was submitted in court". That is page 42. The issue I want to raise is on the following page, Honourable, page 43, "Kota Bharu: Honourable Member", I read, "Wait, Honourable Member. Honourable Member just now said that you are the Minister responsible for the Attorney General's Chambers (AGC). The Attorney General, the Attorney General, is one of the members of the Pardons Board. Surely Honourable Member does not get information from the AG on this issue of the addendum?". The Minister's answer, "I am rather confused, Honourable Member. Honourable Member was also Minister of Law before. Are you saying that the Attorney General reports to you? It's that what you making assumption?". I answered, "Yes. We can get information from the Attorney General". Okay, next. Minister, "No, no. I apologise, Honourable Member. In the MADANI Government, I am the Minister responsible for law. I am not involved in the appointment of the Attorney General. I am not involved - involve myself in looking at files in the Attorney General's office and I am also not involved in the Pardons Board". Then I said, Honourable Member, that is not finished. He continued. This is the important part that I want to highlight. The Minister said, "Because the Minister responsible, the secretariat in the case of the Yang di-Pertuan Agong is the Minister of Federal Territories. Honourable Member, as former Minister of Law in the government, surely Honourable Member is more intelligent than me". That is what the Minister said.
Betul.
Honourable Member, I want to state that the last part, the last portion that I read out, is a statement that is very much not factual and misleads this august House.
Which one is that, meaning?
What it means is "The Minister responsible, the secretariat in the case of the Yang di-Pertuan Agong" that is, this pardon case, is...
Alright.
...Menteri Wilayah.
So, last para itu?
Yes, that last paragraph. I think everyone knows, I also took it from Honourable Member. A media statement, the Pardons Board for the Federal Territories of Kuala Lumpur, Labuan and Putrajaya, 61st sitting, dated 2 February 2024, Friday, the content of which I do not want to read. What I want to read is the bottom part. This statement was made and issued by the Secretariat of the Pardons Board for the Federal Territories of Kuala Lumpur, Labuan and Putrajaya, Legal Affairs Division of the Prime Minister's Department [Applause], which is the ministry of the Honourable Minister of Law himself. So for me, the Honourable Minister of Law
has misled the House. She misled the House and this is a contempt, an insult to the House. Like the Honourable Ayer Hitam who recently raised the matter concerning the Minister of Economy. Under 36(12), we can bring the person who made this statement before the House's Committee on Rights and Freedoms. I do not intend to do that. But that is enough. This involves my integrity. He said I do not know, a former Minister of Law does not know. Even though he said I am more intelligent than him. [Laughter] So, I want this House to determine that the Honourable Minister, to protect his integrity and also the integrity of the House, at least clarify the same matter, that the secretariat to the Pardons Board of Kuala Lumpur, Labuan and Putrajaya is the Legal Division of the Prime Minister's Department, not the Ministry of Federal Territories [Applause] or the Minister of Federal Territories. So, I submit this matter for the consideration of the Honourable Speaker, for a ruling to be made and also for what should be done. Thank you.
Alright, Kota Bharu. As I have already requested from Ayer Hitam, and Ayer Hitam has fulfilled his promise to write to me and has written and I have received it. Likewise, I now advise Kota Bharu. Because the affidavit ... is not sufficient, so Kota Bharu is requested. I request that you write to me, quote what Kota Bharu wants to quote, and also mention what Kota Bharu's intention is in the motion, and I will process it from there. Can Kota Baharu?
Yang Berhormat.
Bolehlah.
Terima kasih.
Honourable Member. If...
Ya, Beluran.
Honourable Member, following on from the fatwa of the Honourable Speaker. Fatwa.
A poet's fatwa today, yes.
Yes. Been with PAS for a long time already... [Laughter]
Staying with PAS, okay, but don't eat too much. I am fat now because I used to eat a lot.
Yes. Honourable Member, 36(12) is a serious standing order. You cannot simply lift someone and refer them to rights and freedoms. Usually in past Parliament sessions, Honourable Member, in situations like those expressed by the Honourable Member for Kota Bharu and also the Honourable Member for Ayer Hitam, the Speaker has the power to ask the Minister to give an explanation in this House, rather than filing written complaints and so on. If it is raised and notified to the House that there is a discrepancy between the Minister's statement and answer, the Speaker can summon the Minister and have an explanation in this House. That is a more intimate action, a shorter process for the Speaker to take. I request that the Speaker look at that. Thank you, Honourable Member.
to the House that there is a discrepancy in terms of the Minister's statement and answer, the Speaker can summon the Minister and obtain an explanation in this House. That is a more personal action, with a shorter process for the Speaker to undertake. I request that the Speaker look at that. Thank you, Honourable Member.
Precisely, Beluran. Thank you. My mentor too. Because I do not have enough facts and I have to look at what the facts are. Insya-Allah, the follow-up actions as mentioned by Ayer Hitam in his request, he also did not wish and so on, nevertheless, I have to look at the facts and I will advise the Minister accordingly, whether they come here to clarify or he writes and I will read what is meant. Okay, Beluran? Thank you very much. Alright.
Mr Speaker, I also have 36(12). May I?
Yes. The same issue or a different issue?
Different. A different issue.
Has that motion been entered yet?
This concerns the presentation by the new Defence Minister, the Honourable "Menhan". May I?
Okay. If the Honourable Member has not yet entered a motion, I think it would be better to enter the motion. Because there will be three or four people who have already entered motions, and I will reject it.
No. I want to raise something briefly. I want to seek guidance from Mr Speaker.
Okey.
May I? Thank you very much. I want to raise the matter of Standing Order 36(12). On 7 November, last Thursday, when the Honourable Member for Kota Tinggi wound up the debate on the Ministry of Defence (MINDEF) budget at policy stage, at which time I was not in the House, he referred to the question that I raised during the earlier debate session with the intention of misleading the House by stating that when I held the position of Deputy Minister of Defence, I should have known the answer to my own question. The question I raised during the MINDEF budget debate at policy stage concerned the rationale for MINDEF's decision to select the company Aerotree Defence & Services Sdn. Bhd. for the contract to lease four Black Hawk helicopters valued at RM187 million for use by the Malaysian Army. The Honourable Member for Kota Tinggi, when touching on the question I raised, in his winding-up speech deliberately misled the House by stating that I should have known the answer to my own question because I was the Deputy Minister of Defence at the time. Please refer to the Parliamentary Hansard where the Honourable Member for Kota Tinggi said that the procurement contract for the Black Hawk helicopters had
been advertised from 15 July to 11 August 2022 and tabled to the Procurement Board in October 2022, therefore I could answer my own question that I raised in this august House regarding the award of the Black Hawk helicopter lease contract to the company Aerotree Defence & Services Sdn. Bhd. Whereas, in fact, the Black Hawk helicopter lease contract was officially awarded to the company Aerotree Defence & Services Sdn. Bhd....
Okay, Honourable Member. Honourable Member has already gone into detail.
Wait. Just briefly. Just briefly.
This is my suggestion. Because it involves the "dignity" of the Honourable Member...
Ya.
...So, I suggest the Honourable Member write to me.
Ya.
I will decide later.
I did not have any intention― I am more like Ayer Hitam too.
Betul.
I did not have any intention to bring it to the Committee on Rights and Freedoms. I only want to...
So, Honourable Member, do write what that intention is.
I want to correct the facts.
Write in a letter what that intention is so that I understand better.
Yes. I want the Honourable Member for Kota Tinggi to admit the mistake. That's all.
Yes, it's alright. Write to me first.
Terima kasih.
Alright, let us proceed with the winding-up. Please proceed, Secretary.
Bill — Supply Bill 2025 Second Reading and Development Estimates Motion 2025Bill
The Order Paper was read to resume the debate that had been adjourned on the questions, "That this Bill be now read a second time" and "That the following motion be referred to the Committee of the Whole House." "That this House, pursuant to subsection 4(3) of the Akta Kumpulan Wang Pembangunan 1966 [Akta 406], resolves that a sum of money not exceeding eighty-eight billion ringgit (RM88,000,000,000) be expended from the Development Fund for the year 2025, and for the purposes and particulars of Development Expenditure specified under Development Purposes or ("P") in the list of Federal Government Estimates of Expenditure 2025, tabled as Command Paper 16 of 2024, be allocated under the relevant Purposes the amounts opposite those particulars in columns six and seven of the said list." [7 November 2024]
Alright, before I invite the Minister of Natural Resources and Environmental Sustainability, I want to inform you that the Minister will have 45 minutes. As we have agreed, those who are not present, the Minister may reply in writing. Those who asked may be answered now. Nevertheless, I thank you this morning. It seems all Honourable Members have come, yes. It looks like everyone has indeed come today. So, I thank you and congratulate you. Alright. Please, Minister of Natural Resources and Environmental Sustainability. 45 minutes from now.
Thank you, Mr Speaker, thank you to the Honourable Members who have joined in debating― there are 18 of them― issues under the Ministry of Natural Resources and Environmental Sustainability (NRES). I also wish to record the attendance of the members of the Setiawangsa Residents' Representative Council who are present in the House today. Overall, I wish to express my appreciation to the Prime Minister and the Minister of Finance, who have allocated RM2.27 billion to NRES, which includes operating expenditure allocation of RM1.4 billion and development allocation totalling more than RM860 million. This is important because this Ministry plays an important role in the agenda of environmental sustainability and also national and international commitments. This includes matters of environmental management, climate change adaptation and mitigation measures
for climate change, conservation and protection efforts for forests and biodiversity, and strengthening the efficiency of natural resource governance to ensure the sustainability of economic, social and environmental development. For the record, we can see significant increases in several aspects. In this year's budget, the ecological fiscal transfers, with permission, which are distributed to state governments for the conservation and preservation of gazetted forest areas, marine areas and so on, have increased from RM60 million when they were first introduced in 2019 to RM250 million for next year. For community rangers, it started in 2019 with 225 persons and 28 posts. In 2023, it increased to 1,000 persons with 118 posts, and next year, a total of 2,100 in Peninsular Malaysia and 500 in Sabah and Sarawak. Community rangers who protect our wildlife. We will also introduce the national carbon market policy, the national climate change bill next year, and in 2026, the National Adaptation Plan. The success of our country has also drawn attention, Mr Speaker, when I represented the country at the COP16 Biodiversity recently in Columbia. The UN Secretary-General has― and I quote, "Many countries around the world are stepping up to lead the way. Brazil, Columbia, Indonesia and Malaysia are leading by example by ramping up efforts to curb deforestation", with permission. So, for me, we are on a good path and I will answer some of the questions raised. The Honourable Member for Larut and the Honourable Member for Kuala Terengganu asked about the current status of rare earth elements (REE) so that we do not fall behind. For information, the direction of REE, we have looked at it holistically across the value chain at the upstream, midstream and downstream levels. It was presented at the 6th National Economic Action Council meeting in 2024, chaired by the Honourable Tambun. A study on the proposed business model, with permission, for this industry has been carried out by the Academy of Sciences Malaysia to look at the ecosystem of this industry. It is seen that Malaysia has great potential to be involved in the downstream industry to become a world producer of super magnets, especially to support the development of the electric vehicle manufacturing industry. However, this requires a local midstream industry to process REE raw materials in the form of rare earth carbonate (REC) produced by local mines. The Honourable Member for Larut also asked about the latest status...
Honourable Member. Two days ago, I read a media statement by the Australian Minister for Resources regarding the opening of the Lynas processing plant. How will it affect Malaysia?
And also another question of mine, relating to the latest report that the newly announced Perak Government has local technology for this processing. Can you state which company? Thank you.
Thank you, Honourable Member. Indeed, the announcement made in Australia, we have been aware of it for some time, and at Lynas's own level we have had discussions with them on local REE processing. We are now processing REE from Australia, and its type differs slightly from what is found in Malaysia, but Lynas has given a commitment that they are prepared to open one more line to process REE from our country. However, we say that any such action must of course comply with strict environmental, safety and health requirements. However, at Lynas's level they have asked for a longer licence period, and we are openly discussing that for evaluation. That means that for them to do this requires a large investment. If they open and then have to close within two or three years, that is not attractive. It is not only them. There are companies such as Super Magnet and others that also want to set up factories in Malaysia; they want to know that they have a future. This is because, at present, the output of Lynas in Malaysia is received by us from Australia, we process it, and we sell it to Vietnam, to Japan and several other countries. Yes.
Will the opening of the Lynas plant in Australia cause Lynas Malaysia no longer to receive REE from Australia after this, and make its plant here open to process Malaysian REE?
The details should be asked of the Lynas company. But as far as I am aware, this is an industry that is very critical to the world economy today, with some geopolitical tensions that we know of between the West and China and so on. So, I do not see that as a challenge. That means that if, for now, they are still interested in continuing, we should make the best use of Lynas's presence in Malaysia to also process REE from our country. On the second matter raised just now, regarding the companies, the announcement by the MB of Perak, we did receive that information. For us, the government is not directly involved in this industry. Any company that says they can process and so on, that is based on their own capacity and ability. So, for us, there are indeed some local companies too that state they are able to process. The challenge may be in terms of scale and cost, where many advantages lie, with permission, with companies from China and also
Lynas, which is quite established in this field. On the matter of REE mapping that was raised...
Yang Berhormat.
Before moving on to...
Ya.
Before moving on to another issue. The major issue is the matter of SOPs. I looked at the Public Accounts Committee (PAC) report of 2 December 2021, which stated that the Cabinet has already approved the SOP implemented in the state of Perak. My question is whether we can finalise the SOP that has been implemented so that we can use it in other states. I think this is an obstacle at state level, thank you.
This SOP has already been shared with all states, all MBs of all states, Kedah, Perlis, Kelantan, Terengganu and the whole country a few months ago. We have seen over the past few days, I think there were several MBs who also announced they plan to further boost the REE industry. So, the SOP has already been shared. Yes, just this REE.
Mr Speaker, the Honourable Minister, thank you. I am also interested in knowing the stand or position of the Federal Government regarding this REE. Since, as the Honourable Member is also aware, this REE is a mineral that falls under the jurisdiction of state government, under mineral enactments and so on, to what extent can the Federal Government guarantee that the process to extract and also process this REE will be given or facilitated in terms of procedures and SOPs, as mentioned by Kubang Kerian earlier, to these states, and a guarantee that there is no interference from the Federal Government that should not occur at state level, thank you.
Yes. Indeed there is no interference. I think the Federal Constitution is very clear on this matter. The Honourable Kota Bharu is also very well aware that the mineral issue falls under the powers of the state government. The SOP has already been shared with the state governments, the MBs have come to meet, we have already shared the SOP. However, as we are also aware, when it comes to export matters and so on, those are included within the scope of the Federal Government. Likewise in terms of procedure, we have the Mineral Development Act which is used to coordinate so that it is carried out sustainably and in an orderly manner, we have the Mineral Development Act. So now there is no problem, it is within state power to act. What we want to ensure is that this value, this, I think it was also raised, why the Honourable Prime Minister requested that it not be exported is so that
we can capture a higher value within our country. We do not want to be like in the early days...
[Bangun]
...Just a moment, Honourable Member, let me say this. In the early days, we had many tin mines, for example, we processed it and sent it abroad. Whereas if we look at our experience with the oil and gas industry, where we have succeeded in creating a very forward-looking oil and gas industry, and this has become a strength for our country. So, I think that is the aspiration. But the government will act even though there are various – also raised by several Honourable Members. To set up PETRONAS and so on for REE does not arise because we want to use the Mineral Development Act and also the existing Federal Constitution. Anyway, we will go through the Mineral Development Act 1994, with permission, in order to improve it, but we do not intend to create a monopoly company and so on. So, that is what we intend, and for now, for the information of Perak, because they are the pioneer mine for this REE project in Kenering, initially after the export restriction was announced, they requested time to look for investors. That is why Perak is now also trying to obtain a local or foreign processing company. There have also been some discussions at the international level, but in the meantime, because there is already outstanding stock that has been mined, special permission has been given for a reasonable period for them to export. Yes, Honourable Member.
Earlier, the Honourable Member said special permission has been given for export for the remaining balance of the plant, if I am not mistaken MCRE. I want to ask, what is this? It was earlier described as the picture that there will be freedom for the states to – and not subject to monopoly and so on. Is it – I have heard of the possibility of a single buying house being established for this REE, which would mean is it in the government's plan that all this REE will be bought by only one entity, thank you.
Thank you, Honourable Member. That is among the proposals discussed, but so far there is no decision on that matter. What has already been decided is the establishment of a committee or task force chaired by me and comprising the Minister of Economy, the Minister of Finance II, the Minister of Science, Technology and Innovation (MOSTI), the Minister of International Trade and Industry (MITI) and several related agencies, with which we want to develop the REE industry from the upstream, midstream and also downstream levels. There are technical committees at the upstream, midstream and downstream levels, as well as research, development, commercialisation, innovation and technology. So, this is so that we have one – because previously it was rather fragmented, with permission, and this caused us problems in developing this REE further.
Next, Honourable Member, if permitted, I think I have answered part of it earlier, to move on to the matter of climate change. The Honourable Larut has suggested that the government establish a clear legislative authority to bind industry players' commitments towards carbon trading, which has the potential to become a new source of wealth for the country and also the states.
So, for information, at the ministry level we are developing the National Climate Change Bill. For information also, the draft consultative paper for this bill has already been uploaded in the National Language and English on the website for all Malaysians to refer to. So, anyone is welcome to give their views. This will be the main instrument to ensure that carbon trading can be implemented effectively. The Honourable Prime Minister has also announced the implementation of a carbon tax in 2026 in the budget speech. This can ensure compliance by industry players, especially hard-to-abate, with permission, those that find it difficult to reduce carbon emissions, such as, as mentioned by the PM, iron and steel and energy, so that we can achieve the GHG emission reduction target for 2030 of 45 per cent across the economy compared with 2005, and also net zero by 2050. We are also carrying out the National Carbon Market Policy (DPKK) study in phases, and this is to support the implementation of compliance and voluntary carbon mechanisms. The DPKK elements will be included in the National Climate Change Bill. At the same time, Malaysia Forest Fund (MFF), an agency under NRES, is pioneering a conducive carbon market ecosystem with the development of Forest Carbon Offsets (FCO) as a National Carbon Crediting System. This enables the development of forest carbon projects and the generation of carbon credits to be implemented within the national context. But at the same time, it ensures global acceptance criteria to guarantee its level of integrity. This is among the challenges in many carbon projects so far. At the same time, we have also held discussions with countries such as Thailand, with Singapore and also with the ASEAN Business Advisory Council (ASEAN-BAC) to have an ASEAN Common Carbon Framework, which we will discuss further next year under ASEAN Chairmanship. It has already been launched with the ASEAN Carbon Forum 2024 and we will give more focus to this matter. Next, the Honourable Puchong proposed that wetlands be taken into account in the BUR UNFCCC report for the measurement of national carbon sequestration. For information, starting from 2024, the reporting of the Biennial Update Report (BUR), with permission, has been replaced by the Biennial Transparency Report (BTR). This change is based on COP24 in Poland in 2018, which I think was attended by the Honourable
Puchong at that time. This is part of the enhanced transparency framework under the Paris Agreement. The BTR replaces the BUR with a more comprehensive report format, covering the greenhouse gas inventory, tracking of the Nationally Determined Contribution (NDC), with permission, as well as financial support, technology transfer and capacity transfer received and required. Therefore, Malaysia does want to ensure that all greenhouse gas emissions and removals from all land use, land-use change and forestry for wetland areas, including peat soil and mangrove swamps, are reported in the GHG inventory. We use the 2006 IPCC Guidelines for National Greenhouse Gas Inventories, with permission, to calculate greenhouse gas emissions and removals, including carbon dioxide, methane and nitrous oxide. We are also, in reporting, the rewetting activities that have taken place in peat swamp forest areas in our BTR 1 report as one of the improvement measures compared with previous reporting.
[Bangun]
Returning to carbon credits as well, the Honourable Puchong proposed that the government provide incentives to encourage nature-based carbon credit projects such as reforestation and restoration of mangrove forests, and that these can be traded either on the Bursa Carbon Exchange in our country and also generate more income. For now, one of our challenges is that forest carbon projects in our country adopt crediting systems from abroad. We have just had the first auction or sale at the Bursa Carbon Exchange by the Kuamut project from the state of Sabah. From the start of that project until it was successfully auctioned on the Bursa Carbon Exchange, it took 10 years, yes, quite a long period. So there is a bottleneck there at the level of this international crediting system, crediting system or certifying system. So that is why we are looking at the FCO mechanism or the ASEAN mechanism that can help us do this more quickly. Next, the Honourable Simpang Renggam...
Sebelum pindah.
Ya.
Thank you. What was raised is the matter of the northern Kuamut forest reserve covering an area of 83.3 [Inaudible] hectares that has been traded. Looking at this report, the Sabah Government received about RM1 million in revenue. However, I would like an explanation: what price did Sabah offer for the carbon that has been produced? Which company bought it? What is the lease period for the production of that carbon? Thank you.
Thank you, Honourable Kubang Kerian. I will provide those details to the Honourable Member in writing.
The Honourable Simpang Renggam and Paya Besar proposed to the government...
Tan Sri Speaker.
Ya.
Permission to interject. I have one more proposal concerning methane.
Oh, okay. Yes, thank you, Honourable Member. Regarding methane or metana, okay, for information, we have also participated in the Global Methane Pledge that was launched during COP28 in Glasgow in Scotland. I think the Honourable Kubang Kerian was there at that time. It places a global commitment on us to implement a 30 per cent cross-sector reduction in methane emissions compared with the emission level in 2020. Based on BUR4 that was submitted in 2019, the total methane emissions in Malaysia are only 15 per cent of total greenhouse gases, but this does not include removals from the LULUCF sector. Based on that report, methane emission mitigation actions implemented under the main sectors such as agriculture, waste, and the oil and gas industry are through the following activities: first, the capture of methane gas for use as fuel for the palm oil industry. Second, the reduction of fugitive gas emissions containing methane in the industrial and oil sectors. If we often go to Terengganu or Sabah, Sarawak, we see it being burnt at oil processing areas. Also initiatives to reduce methane emissions at landfill sites. For the BTR reporting process that began in 2024, the government will continue to report methane emissions this year. At NRES level, we are in the process of finalising the development of the Long Term Low Emission Development Strategy (LT-LEDS) document and also the NDC Roadmap and Action Plan, with permission. This will be the basis for us to look at a long-term strategy with the country's latest commitment, which is net zero. Previously we said as early as 2050, now actually our task is bigger because we have said by 2050. This includes methane emission mitigation strategies for the waste and oil and gas sectors. To ensure this issue is addressed holistically and comprehensively, NRES is exploring the development of a National Methane Emission Reduction Plan under the Thirteenth Malaysia Plan. Next, the...
Sorry.
Ya, Puchong.
Request for clarification. Honourable Minister, I am very proud that we will have a National Methane Reduction Plan. I want to ask two things. One, what is the current reduction compared with the base level? Second, when will this plan be tabled? Because I think the deadline is 2030. So...
Yes. Both of these, the first about the details, about the latest reduction, this one, Honourable Member, I will give in writing. Likewise the details of the plans, I think, perhaps because we have only just begun to go through the RMK process, but I also understand the urgency of the matter. This is because it requires many intervention actions from those involved in the oil and gas industry and also from the industry involved in the waste sector, waste processing. I see that, in terms of palm oil, there has been quite noticeable progress, but for both waste and the oil and gas industry, more intervention is needed. Next, the Honourable Member for Kemaman has proposed that the government form public-private partnerships to face the challenge of high costs in implementing the green technology development agenda in the nation's economic sector. Indeed, this is one of our approaches so that development and project implementation costs are borne by the private sector, and the government can provide or prepare assistance in the form of incentives or encouragement such as, with permission, the Green Investment Tax Allowance (GITA) and the Green Technology Financing Scheme (GTFS). For the information of the Honourable Member, this green technology financing system is an easy financing scheme that was first introduced as early as 2010 and is open to the energy, transport, manufacturing, water, waste and building sectors. In 2024, the government approved another RM1 billion for this year and next year. Continuation of the– therefore, the Right Honourable Prime Minister has agreed to continue the GTFS financing system for 2026 with another RM1 billion. The Honourable Member for Kuantan, meanwhile, asked for an explanation of the government's readiness in dealing with floods during the monsoon season. For the information of the Honourable Member, METMalaysia does operate 24 hours a day, seven days a week, throughout the year to monitor the nation's weather situation. METMalaysia will issue information and warnings if severe weather that may cause disasters is expected based on the existing weather models. For your information, we have– for your information also, METMalaysia has also– always shared information with NADMA at the federal, state and district levels, and also with major stakeholders such as TNB, PETRONAS, Prasarana, state water companies, transport companies, and also with Members of Parliament and local residents so that there is readiness should flooding occur. METMalaysia has also upgraded 60 surface observation stations to automatic weather stations, and this was fully completed in 2022, and it is now upgrading 100 automatic surface observation stations through RP3 RMKe-12 and is expected to be fully operational by the end of this year. METMalaysia also has a website and the myCuaca application to share information with the public.
At the same time, with several of these recent incidents that we have seen, I have asked METMalaysia to review the existing SOPs because sometimes we overlook things. The public overlooks weather warnings, so how do we enable the public to obtain weather information better? So, this is a process being carried out by METMalaysia. Next, Honourable Member, on the issue of biodiversity and forests, a lot has also been raised. Just for your information, in the case of the latest incident, the case of the Malayan tiger knocked down in Gerik recently. Apart from the tiger being crushed by a trailer, what is more distressing is that we suspect poachers later came and stole the tiger's skin from the head and body, as well as its fangs and claws. So, even in such circumstances, these illegal hunters or poachers remain at large. So, indeed, reducing human-wildlife conflict is among the priorities. It is for conservation, but also for ensuring human safety and the safety of our property. The Honourable Member for Gerik asked about elephants and tigers. Indeed, this was raised by the Honourable Member for Gerik earlier. For your information, PERHILITAN has carried out 23 elephant capture operations from 2020 to 2024 to relocate them to wider, suitable habitats far from settlements, built three permanent elephant electric fence systems at Kampung Bukit Sapi, Kampung Batu Ring One, RPS Air Banun and also Bersia to reduce elephant intrusions. It has installed four satellite collar units for elephant groups that have been identified to monitor the movement of these elephants and take action if they approach villages or farms. It has implemented habitat enrichment by creating two artificial jenud under the wildlife viaduct of the Central Forest Spine ecological network in the areas of Temenggor Forest Reserve, Aman Jaya Forest Reserve, Belum Forest Reserve in Gerik to attract wildlife, especially elephants, so that they do not cross over the road. Because for these wild animals, having only a passage for them to cross is not enough, you have to attract them. Among these are food for elephants, for example, or salt licks for certain animals such as deer, so that they will use that route. When deer pass, tigers usually also pass through that area. Implementing wildlife management under the Royal Belum State Park Special Area Plan, Perak, to address human-wildlife conflict issues such as elephants and tigers, installation of 144 LED light poles at 17 elephant crossing hotspot locations, installation of 12 elephant crossing signboards on the East-West Highway, and carrying out publicity in various forms. At the same time, PERHILITAN has also implemented patrol control and monitoring in conflict areas, installation of traps when complaints of conflict are received
and encouraging livestock farmers to build stronger livestock pens and manage livestock more systematically to avoid tiger conflicts, conducting public awareness programmes and holding engagement sessions. So, as we know, the core issue is habitat, yes. However, if their living places for these wild animals have already been destroyed or– even if they exist but are separated, fragmented, with permission, then they need a large range. Tigers and elephants can walk hundreds of kilometres, that is their range, and especially since another problem we face is the problem of prey animals such as wild boar that are in critical condition or a shortage of deer, so that is why– meaning, humans are not a priority for tigers. If possible, they also do not want to eat people. But when they– whether they have no food or they are usually sick, only then will they disturb humans. So...
Honourable Minister.
Ya.
A little related to the prey animal population just now. So, if we look, many of the cases that occur are because there is an insufficient number of prey animals in the forest. So, what are the government's drastic efforts? If we look at it, there needs to be a comprehensive and immediate intervention so that the number of these prey animals can be increased, and at the same time, we can reduce conflict between tigers and humans. Thank you.
Thank you, Honourable Member. For now, there is indeed a programme to release these prey animals, usually deer and mousedeer. It is carried out in these forest areas to increase the population there. However, we also– we will have a MyTTF meeting, that is a task force for tigers, with the state government, PERHILITAN, JPSM (Forestry Department of Peninsular Malaysia) and so on.
Yang Berhormat...
We will also– I will bring it up because I feel this issue has become increasingly critical. So, perhaps we need to multiply our efforts further. The efforts we have now may not yet be enough to further enrich the conditions in the forest to prevent these animals from coming out.
[Bangun]
Honourable Minister, Tenggara a little, Honourable Minister. Tenggara, Tenggara.
Honourable Minister, just a little. If possible, I would like the data to be shared, on how many of these prey animals were released in the past five years, yes.
Ya. Boleh.
The types of animals and also the number released. Thank you.
Yes, Honourable Member, but I can say here that it is still far too few, and we are looking into increasing them. Yes.
Yes, Tenggara at the back.
Tenggara, Honourable Minister.
Oh, ya.
A little. Thank you, Honourable Minister, thank you, Mr Speaker. I thank the Honourable Minister for visiting Tenggara recently in connection with this human-elephant conflict.
So, what are the next steps, Honourable Minister, in relation to my area, because there are two elephant groups. Then in the areas of Kampung Temenin, Kampung Batu Empat, Lukut, Sepak Hulu, Sepak Hilir, there are activities related to homestays and campsites. So, for 2026, we have the Visit Johor Year and the Visit Malaysia Year. So, perhaps we hope for cooperation from the ministry to see how to handle this human-elephant conflict issue. Thank you.
Can you answer together with Gerik?
Yes. Thank you, Mr Speaker. Thank you also to the Minister, because many of the actions announced are being taken for the Gerik constituency. However, from the perspective of urgency, in this year alone, two deaths from tiger attacks have occurred, and elephant attacks, from last year until this year, have also involved two or three ministries. Then, these new tigers were crushed by lorries, all of them, right. So, Gerik is of the view that what is needed by PERHILITAN Hulu Perak, especially in the areas that guard Royal Belum and so on. Gerik feels there are several urgent budget items that they are actually trying to request. But perhaps the ministry should look into them carefully because when I met the PERHILITAN officers, there are several items that are hoped the ministry will channel funds for quickly, which should indeed be done. Then, the second point. Gerik is of the view that one of the main factors is due to forest clearing. So, if we look at it, when there is forest clearing, logging and so on, surely there should be replanting according to the requirements that should be met, right? But we see that the replanting process may not have happened, or it did happen but was not fully restored. So, what action will the ministry take to overcome this matter?
Baik. Menteri?
Thank you, Honourable Members. Before that, I would like to welcome the presence of the delegation from the Dewan Perniagaan Tionghua, Sandakan and our media friends from Sandakan. So, the Honourable Member for Sandakan asked me to say that they have travelled nearly 3,600 kilometres to come here.
Oh.
Thank you. So, regarding the matters raised, I will share the data with the Honourable Member for Putrajaya shortly. Next, on the issue raised by both Honourable Members from Tenggara and also from Gerik, it is indeed true that, for me, we are always playing catch-up, with permission, with PERHILITAN. So, sometimes when a lot of disruption occurs to habitats, it is PERHILITAN that has to come. So, we are already late. That means prevention cannot be done, but we want to remedy the matter, and it has become quite delayed. So, that is one of the challenges. It is not that I say we must accept it or not, we have to face it. This is reality. When there is development, when there are these things that we have to go through. What I can say is that that is precisely why public-private partnership is very important. As in Royal Belum, in conservation efforts, many private parties are also involved. In Johor too, we are about to complete an elephant sanctuary and I will go down in December to see the preparations. Among the things it will take time for is preparing food for the elephants. That is also one matter. So, this matter is not – elephants do not eat just a little. So, these are among the constraints we have, but I welcome cooperation and I also need assistance from the state government so that we can overcome this matter together. At the Federal level, for example, we have imposed a moratorium. This is from the time of previous governments, on new forest plantations. Because it is also a challenge, because many times they promise to replant but do not replant. Because the forest plantation business is not a cheap business. So, many cannot afford to do it, and the government has maintained the moratorium despite requests from state governments to continue allowing forest plantations in the Permanent Forest Reserve (HSK) for new areas. But I take note, and we will continue to discuss to obtain more infrastructure support for PERHILITAN so that they can act more quickly.
Tenggara.
Southeast and also from Gerik is about, indeed for me, we always play catch-up, with your permission, with PERHILITAN. So, sometimes when many disturbances occur to habitats, it is PERHILITAN that has to come. So, we are already late. In terms of prevention, we cannot do it, but we want to treat the matter, and it has become rather delayed. So, that is among the challenges. I am not saying whether we want it or not; we have to face it. This is the reality. When there is development, when these matters arise, we have to go through them. What I can say is that this is precisely why public-private partnership is so important. Like at Royal Belum, in conservation efforts, indeed several private parties are also involved. In Johor as well, we are preparing an elephant sanctuary, and I will go down in December to see the preparations. Among the things that take time is preparing food for the elephants. That is also one matter. So, this matter is not – elephants do not eat just a little, you know. So, these are among the constraints we have, but I welcome cooperation, and I also need assistance from the state government so that we can address this matter together. At the Federal level, for example, we have imposed a moratorium. This goes back even to the previous government, on new forest plantations. This is also a challenge because many times they promise to replant but do not replant. Because the forest plantation business is not a cheap business. So, many cannot afford to do it, and the Government has maintained the moratorium even though there have been requests from state governments to continue permitting forest plantations in Permanent Reserved Forests (HSK) for new areas. But I take note, and we will continue to discuss to obtain more infrastructure support for PERHILITAN so that they can act more quickly.
Just a little more, Honourable Minister. I think the story about forest replanting, since long ago, I think has never succeeded. So, I wonder whether the ministry can establish something like either an NGO or a private company under the ministry that takes in our local people, for example the Orang Asli and so on? For example, if the area is in Gerik, we take Gerik people, because the people of Gerik themselves want to save the forest. When we ask outside private companies to do it, perhaps for their own attention they are not really keen on protecting the forest. So, let the ministry look into this proposal, right. Thank you.
Okey.
Okay, thank you. I think we will take note of that. Also for me, I want to continue regarding what was mentioned just now
which is that when we talk about forests, we must talk about the EFT. Paya Besar and Kuala Nerus raised that the EFT is too small or that there are new conditions and so on. In fact, this increase is very significant. As I mentioned earlier, from RM60 million in 2019. Then, the PM increased it, the PMX increased it. He has raised it to RM150 million, RM200 million, RM250 million. So, if that is more than four times the increase. However, we also want to ensure that because now it is based on many weightings, mainly on the extent of the area being conserved. So, that is something I think is good and will continue, but for the next step, that is what was mentioned in the Tambun speech, namely that we want to raise performance to 50 percent. What is this performance? During the previous government, at the time of Kota Bharu, they amended the Forest Act. The Forest Act 1984 was amended so that a public hearing must be held for degazettement. If it is degazetted, they must replace it with exactly the same size immediately. So, this is actually a model that has been adopted by Selangor, and I want to commend the Perlis Government which fully adopted that Act. Because we know that forests are also a state matter, at the level of enactments. But other states still have not, or if they do, they do it half-heartedly. They say they do not want all of it. So, I encourage all states to adopt the Forestry (Amendment) Act 1984 that we made in 2022 so that it will enable us to protect our forests better. Likewise the EFT...
Menteri?
...After this the quantity element. Sorry, the quality element, namely what effort they make, whether to adopt this Act or other efforts. Perhaps their forest is not large, but they have made sincere efforts. Thus, this will also be part of the calculation so that states can receive a larger amount from this RM250 million. Yes?
Thank you, Tan Sri Speaker. Thank you, Honourable Minister. Regarding the EFT, what is the Honourable Minister's view, is this method still expected to be improved in effectiveness? Although we have increased the allocation, I congratulate the leadership of the Right Honourable Prime Minister for increasing it three or four times. However, the first question is whether it can achieve effectiveness, and second, whether increasing the total allocation can bring the Federal and the states closer together? Because, as the Honourable Minister said earlier, there is a reluctant spirit from the states? What is the reason? Thank you, Tan Sri Speaker.
Thank you. I do not deny that reluctance. Perhaps I think it is because for the states, for example, logging or turning land into plantations and so on, that is an economic activity that is easier to understand. But how can we increase tourists, ecotourism, or how can we get involved in carbon credit trading, which is still very new? These are things that are difficult to understand, and perhaps for the states, they ask what is the benefit to them?
Just one more thing I want to say. I once met a Menteri Besar together with the Prime Minister, and he obtained a lot of aid for flood mitigation and a lot for water supply, but at the same time I told him that this is Federal money, yes. I said, I request, I said, when are you going to open that forest, think about it, because later you will have to add more money for floods and money for water supply. So, he must also look at the impact on that state. But I take note, and we will continue to improve. I just want to go in a little...
Deputy Minister, just a little. Regarding the EFT. Kuala Nerus, okay?
Ya.
Terengganu, it is true that, as the Minister answered earlier, one of the criteria for receiving a large allocation, apart from area, depends on the effort of the state government in protecting the forest. So, Terengganu's forest area with a diameter of more than 50 per cent is indeed large, but the effort is lacking. This is because we lack the state's own funds to spend on effort. Perhaps if assessed in terms of effort, we are lacking. So, that is why we received a rather small amount last year, which I believe was only RM13.94 million. So, can you consider the effort of this poor state so that the criteria can be relaxed? Thank you.
That is why this year we increased by RM17.7 million for 2024, from RM13.94 million. Insya-Allah, logically, if all of that is okay, next year it will also increase, because once the tree allocation has been increased to RM250. But that is why for us, we want to take more effort into account for 2025 compared with this year. So, that is one of the matters we will look at. However, if in...
I want to touch on this briefly.
Sikit sahaja.
I just want to ask for the views of Tan Sri Speaker to the Honourable Minister. I see that we are facing natural disasters, although some natural disasters fall under PETRA. I just want to ask the Honourable Minister, why do we not focus on nature-based solutions rather than engineering-based solutions? Because engineering, in the end, is nature itself that will cause- how does the Honourable Minister's ministry see this understanding, so that solutions using nature are further enhanced so that biodiversity becomes a fundamental part? Has the concept of understanding in our country decreased in terms of these nature-based solutions? Thank you, Tan Sri Yang di-Pertua,
Before the Minister answers, how many more minutes does the Minister need to wrap up?
Lima minit.
Time limit. Okay, I will give five minutes. So, wrap up everything, yes?
Ya.
Terima kasih.
So, I agree. That is why, for example, even at the JPS level, it has PRISMA to look at environmentally friendly approaches. But I remember this matter more clearly when we are finalising - at this moment we are finalising the National Adaptation Plan (National Adaptation Plan), because when we talk about climate change, we must not only reduce greenhouse gases but at the same time we also know that, whether we like it or not, it has already happened today. Climate change. We must adapt to the reality of today. Nature-based approaches are indeed what should be prioritised. I agree. I just want to touch on, last of all, the complaint raised by the Honourable Member for Kepala Batas, regarding the pollution issue of the Sungai Kerih and also Pantai Esen in Permatang Damai Laut. For your information, JAS has carried out inspections of all industries in this area since 2015. The premises comply with the requirements of AKAS 1974. However, we do have a slight weakness, where in terms of the legal scope that we need to review, it may be that the discharge of waste from pig farming is not controlled under AKAS 1974. So, in the second phase, we may need to look at this matter. In terms of the water quality of the Sungai Kerih through the monitoring station in that river, the latest readings from January, March, May, July, September this year show that its quality is between Class 3 and Class 4, with the ammoniacal nitrogen sub-index reading contributing to the high reading. This is suspected to come from pig farms because there is no sewage treatment plant in this area. We have also conducted a study on odour pollution in the surrounding area, which is also rather high. We have already shared this with the departments and agencies responsible, such as the Department of Veterinary Services, the Seberang Perai City Council, and JPS for their action. As for the complaint about pollution at Pantai Esen Permatang Damai Laut, NRES was indeed aware of this matter, of this complaint. The investigation was carried out on 21 October. The Department of Environment went down and instructions were given to the company Silicon Island Sdn. Bhd. to also conduct sampling of floating materials and marine water quality samples. We are also carrying out continuous monitoring of the issue that occurred in the Pantai Esen area. At the latest inspection on 28 October 2024, we found that Silicon Island Sdn. Bhd. had already cleaned the beach. So, I would like to express my many thanks. I did not have time to answer everything. The other answers I will submit in writing, whether the— Yes, Honourable Member?
Before closing. I congratulate you on the plans that have been made. I see that the tasks specifically at the climate change level are very big, apart from reporting and so on. I want to know the status of the existence of the department. A specific agency to handle under the
ministry that we had previously applied for, to establish a special department to help complete reporting with the allocation made, and the status of the enforcement officers of the Department of Environment with new uniforms and so on. What is their latest status? Thank you.
Thank you, Honourable Member. First, I express appreciation to Kubang Kerian, because I think we can continue this matter as there is a good foundation before this. As for a special agency or special department for climate change. For your information, we are in the process of the National Climate Change Bill, and if we look at models such as in the UK and several other countries, they have a special body for climate change. Like the Energy Commission for energy and so on. We are looking at this matter. Of course, we are discussing how its form and so on should be. But I agree, indeed its requirements are very high. Reporting and so on. Very time-consuming. If we do not have a special team, a dedicated one, then we will struggle with this matter. As for JAS, in the latest budget, the Honourable Prime Minister has also approved the empowerment of the Department of Environment, and in the discussions, we are continuing discussions for the second phase of amendments to the Environmental Quality Act. But what I can say positively from my discussion with the Minister of Finance is that the fines have increased. From RM100,000 to RM10 million. If all those fines go to the Federal Government Consolidated Fund, then JAS will have no incentive. Whereas if we look at LHDN and Customs, they have an incentive for them. They are open because we say that if we collect, we will collect even more for the Federal Government, but please allow us to add staff or add infrastructure and facilities for JAS. So, once again I thank all the Honourable Members who took part in debating the issues under NRES in this Budget 2025. Thank you.
Alright, thank you, Minister.
Datuk Speaker.
Next, I invite...
Datuk Speaker. Tan Sri Speaker. I just want to know, for example, when questions are not answered, they will answer in writing. But the problem is, even though sometimes the Minister or the one answering says the written answer is coming, the written answer does not arrive. For example, like me. Since 21 October, I have been waiting for a written answer from the Honourable Deputy Minister of Defence, Alor Gajah. My question is simple. What is the total number of intrusion incidents, what is the total number of diplomatic notes, on the Speaker's own instruction to provide written answers. I want to know the guideline from Tan Sri, when Ministers answer they will answer in writing, how long? Is it one day, a week, or something like that? This is 21 October, and until now I have still not received a written answer. Thank you.
Alright. I have already informed, especially the ministers and the executives. When we say we will provide written answers, the officers at the back are there. The officers already have that answer. Coordinate directly with the secretariat in Parliament to post those answers to us, and we will continue to forward them to the Honourable Members who asked. So, I am confident the officers already have the answers. It is just that they need clearance from the Minister. I think— Five days, yes. I have already made a decision, within five days ministers must respond to their commitment to provide written answers to the one who asked.
Terima kasih.
Five days, yes?
This is 21 October. Still not received from Alor Gajah.
I think the ministry...
Tan Sri Yang di-Pertua.
Wait, let me finish this sentence first.
Tan Sri, may I have a moment? Because it was mentioned. As I recall, I signed the reply letter one day after the question was submitted.
Yes. So, the Honourable Member must check, perhaps it went to the service centre. All correspondence goes to the service centre. It did not go to the home address. So, check again, okay. Check again.
Yes, Tan Sri Speaker.
Ya.
Standing Order 36(6): a Member shall not make malicious imputations against any other Member. 36(12): "Any Member who makes a statement that misleads the House shall be deemed to have insulted the Council, and that Member may be referred to the Committee on Rights and Privileges for that offence." Mr Speaker, I ask for some space to explain why I am raising this rule. Last Thursday, Ayer Hitam raised a standing order to charge the Minister of Economy that the Minister of Economy had made an allegation or a statement that had misled the House. After I examined all news reports and also the Hansard, I found that the Member who truly misled the House was not the Honourable Minister. It was the Honourable Member for Ayer Hitam. Allow me to explain why...
Sebelum...
Let me explain.
Kampar, Kampar, listen to what I say, Kampar. Kampar, sit down for a moment. Kampar, sit down for a moment. While Kampar has the right to speak in
this House and to raise a standing order, I also have the right to answer the questions raised. My right overrides Kampar's right.
I want to inform that Ayer Hitam has already written to me, and I am conducting an investigation, and I have also written to the Minister. Give me a little time, two or three days, for me to assess who is right and who is not. For that, the process will take place in the near future. So, once the decision is made, we will inform what has happened. So, Kapar, be patient. So, one cannot make assumptions because Ayer Hitam has already written to me. So, for what was raised...
Speaker, I think it is also clear in the news...
Listen, Kapar.
Ya, ya.
I say my chair is higher than Kapar's.
Okay, thank you. Thank you, Tan Sri Speaker.
Kapar, sit down first. Therefore, Kapar, the ball is now in the court of the Minister of Economy, because Ayer Hitam has already written to me. As for Ayer Hitam, perhaps Kapar has information and so on, that is another story. The story is that Ayer Hitam has already written to me. It is the Minister's responsibility to answer me. From there, I will make a consideration and I will make a decision. For that, Kapar, please be patient, so that we can inform you later. Alright, now I invite...
Tan Sri, I think Tan Sri is mistaken. It is Kampar, not Kapar. Kampar is over here... [Referring to the government supporters' bloc] Kapar is over here... [Referring to the opposition bloc]
Ah, Kampar, yes. Sorry, yes.
Thank you, Tan Sri.
Kampar. People of Kedah, they have a bit of a problem. I mean, Kampar. Okay, thank you, Alor Setar. Alright, I now invite the Minister of Entrepreneur and Cooperative Development, 45 minutes.
Thank you, Mr Speaker. First, allow me to extend millions of congratulations to the Honourable Prime Minister in his capacity as Minister of Finance, who tabled Budget 2025 Malaysia Madani under the theme Ekonomi MADANI, Negara Makmur, Rakyat Sejahtera.
The Ministry of Entrepreneur and Cooperative Development (KUSKOP) extends its highest appreciation to the Honourable Prime Minister for his concern for micro, small and medium enterprises (PMKS) entrepreneurs in this country, by announcing loan facilities and financing guarantees for the benefit of PMKS entrepreneurs with a total value of RM40 billion. Mr Speaker, this ministry has been allocated a total of RM815.1 million under Budget 2025, namely RM551.9 million for development expenditure and RM263.2 million for operating expenditure. Mr Speaker, I would like to inform this august House about several policy matters initiated by KUSKOP to drive the development of PMKS, franchises and cooperatives, namely— First, the launch of the ESG Quick Guide for PMKS. Second, the launch of the National Hawkers and Small Traders Development Policy. Third, we will table the proposed National Franchise Policy to the Cabinet. Fourth, what is currently ongoing is a series of engagement tours with the national cooperative movement regarding the proposed amendments to the Cooperative Societies Act. And fifth, KUSKOP has introduced the Social Enterprise Day initiative starting this year. Mr Speaker, next I would like to express appreciation to 35 Honourable Members, namely Pagoh, Larut, Semporna, Ayer Hitam, Kinabatangan, Kubang Kerian, Rantau Panjang, Kangar, Padang Besar, Kepala Batas, Paya Besar, Kuala Kangsar, Tangga Batu, Puncak Borneo, Hulu Terengganu, Betong, Permatang Pauh, Padang Rengas, Klang, Petaling Jaya, Kalabakan, Besut, Kulim-Bandar Baharu, Sungai Besar, Mersing, Setiu, Shah Alam, Bagan Serai, Klang, Julau, Kota Marudu, Miri, Stampin, Tampin and Jeli, who took part in debating a total of 20 matters related to this ministry during the policy-level debate of Budget 2025. Taking into account the matters raised, my winding-up today will be aligned based on the five main topics raised, namely:- (i) implementation of entrepreneur development programmes and financing schemes; (ii) development of the halal industry; (iii) empowerment of the functions of SME Corp.; (iv) the cooperative movement; and (v) implementation of e-invoicing and the effects of the minimum wage harmonisation. I will give priority to providing explanations or feedback on the matters raised by the Honourable Members who are still in this House.
Mr Speaker, the Honourable Members for Rantau Panjang, Pagoh, Kangar, Padang Besar, Kepala Batas, Tangga Batu, Puncak Borneo, Klang, Miri and Mersing have touched on the implementation of development programmes and data on entrepreneurs involving specific target groups such as women entrepreneurs, B40, Bumiputera youth, craft entrepreneurs and local vendors. This includes special programmes covering micro-financing for small traders and hawker centres, as well as proposals for providing a comprehensive plan to assist PMKS. Rantau Panjang, are you still here? I will give written feedback. Honourable Member for Kangar? Also written feedback. Honourable Member for Rantau Panjang and Padang Besar? Also written information. Honourable Member for Kalabakan? Honourable Member for Pagoh is also not here. Honourable Member for Klang? Also no longer here. Honourable Member for Rantau Panjang and Miri? Also not here. Honourable Member for Padang Besar and Kepala Batas?
Kepala Batas is here.
Kepala Batas. The Honourable Member for Padang Besar and Kepala Batas raised matters regarding financing assistance, including micro-credit to small traders. For the information of the Honourable Members, KUSKOP is indeed concerned about the community of hawkers and small traders and has provided micro-financing assistance as follows:- First, TEKUN Nasional has implemented the TEMAN TEKUN financing scheme, which is based on group financing concept that is easier, faster and more efficient for hawkers and small traders to run or further expand their businesses. From January to 30 September 2024, a total of 10,513 entrepreneurs obtained group financing under this programme, with a total financing amount of RM81.3 million. Second, the Micro Financing Scheme for Hawkers and Small Traders 2.0 by Bank Rakyat, which offers financing of up to RM50,000 maximum and no interest rate is charged. As of 30 September 2024, a total of 2,451 hawkers and small traders have received financing under this scheme involving a total amount of RM49.76 million. Honourable Member for Klang? I will provide written feedback. Honourable Member for Tangga Batu? Also written feedback. Honourable Member for Puncak Borneo and Kota Marudu? Written feedback. Honourable Member for Mersing?
Ada, ada.
The Honourable Member for Mersing raised the need for assistance to craft entrepreneurs, especially in Mersing.
For the information of the Honourable Members, TEKUN Nasional has provided special financing for entrepreneurs engaged in the handicraft industry under the Craft Entrepreneur Financing Scheme. For the period January to September 2024, TEKUN Nasional disbursed financing totalling RM3.6 million to 163 entrepreneurs in the handicraft field. Of that amount, four entrepreneurs in the state of Johor received financing totalling RM83,000. In addition, SME Corp. also provides the Tunas Usahawan Belia Bumiputera (TUBE) programme, which offers capacity-building assistance in the form of training, business start-up grants and advisory services. To date, there are two TUBE programme participants in Johor who are involved in the handicraft industry and have received start-up grants valued at RM30,000. In Mersing, I am informed that there are none yet, but if there are handicraft entrepreneurs who are interested, the Honourable Member may refer them to me. The Honourable Member for Pagoh is not in the House. Mr Speaker, the Honourable Members for Paya Besar, Padang Besar, Kuala Kangsar and Bagan Serai have raised specific matters concerning the development of the halal industry, particularly as it relates to MSME entrepreneurs. The Honourable Member for Paya Besar? The Honourable Members for Padang Besar and Bagan Serai? I will provide a written response. The Honourable Members for Kuala Kangsar and Bagan Serai? Kuala Kangsar? A written response. Mr Speaker, the Honourable Member for Petaling Jaya has proposed that SME Corp. be strengthened as the apex body for the development and growth of MSMEs covering various sectors such as agriculture, manufacturing, trade, tourism, services and so on. For the information of the Honourable Member, SME Corp., as one of the agencies under the Ministry of Entrepreneur and Cooperative Development (KUSKOP) and as the central coordinating agency for the implementation of SME development programmes under the Malaysian Small and Medium Enterprises Corporation Act, has been entrusted with coordinating, supervising and evaluating the implementation of policies, strategies and programmes for SMEs across all economic sectors.
In line with this function, SME Corp. has coordinated, consolidated, monitored and evaluated the progress and effectiveness of MSME programmes implemented by various ministries and more than 60 entrepreneur development agencies since 2009. In addition, the SME Corp. Malaysia Business Strategic Plan 2022-2030 has been developed to catalyse the transformation of MSMEs towards achieving sustainability and a leap in business growth, and to create more MSMEs within domestic and global supply chains. Furthermore, the role of SME Corp. has also been strengthened through its appointment as Head of the Secretariat of the National Entrepreneur and MSME Development Council, which is chaired by the Right Honourable Deputy Prime Minister. This Council
is tasked with monitoring and coordinating comprehensive entrepreneurship and MSME programmes through the reporting of the Integrated SME Action Plan (SMEIPA). Under SMEIPA reporting, the coordination of planning, implementation, monitoring and evaluation of the outcomes of MSME development programmes is reported by the various ministries and agencies that provide MSME development programmes. This is to ensure the implementation of more holistic and integrated entrepreneurship programmes...
Honourable Minister, may I? Paya Besar, not included.
Apa dia?
Jawapan saya?
I will continue with the next one first. If there is time, I will return to...
Just a moment, Honourable Member, there are only two or three pages left, Honourable Member.
Mr Speaker, the Honourable Member for Sungai Besar has raised matters concerning cooperative movements such as easy loans. For small cooperatives, the Statutory Reserve Fund and the allocation for the Malaysia Cooperative Entrepreneurship University (UKKM) under the Cooperative Education Fund. For the information of the Honourable Member, KWRS is a reserve or savings that must be maintained by cooperatives out of annual profits before distribution. KWRS is a fund maintained by every cooperative under subsection 57(1) of the Cooperatives Act 1993 out of audited net profits each year, in the proportion determined by the Cooperative Commission. For the time being, every cooperative must transfer to the Statutory Reserve Fund KWRS not less than 13 per cent of audited net profit, starting from the financial year ending 31 December 2023 until 30 November 2025. Under subsections 57(1A) and 57(1B) of the Cooperatives Act, KWRS may be used for the following purposes. First, subject to regulations or by-laws, to pay shares or fees issued to cooperative members, or second, with the approval of the Cooperative Commission and subject to any terms and conditions that may be imposed by the Minister of Finance (HKM), to issue bonus shares to the members of that cooperative. KUSKOP is currently of the view that KWRS should not be used to provide easy loans to cooperatives. In this regard, cooperatives may apply for financing from the Revolving Capital Fund (SKM) subject to the eligibility and criteria set, which offers a maximum secured purchase of RM30 million and unsecured payments of RM200,000. In addition, cooperative-based banks such as Bank Rakyat and Co-opbank Pertama also provide various financing facilities to the cooperative movement, and special financing products are also provided to the cooperative movement that sets
minimum eligibility requirements without neglecting governance requirements and the best credit administration. The profit rates charged by Bank Koperasi are also competitive and on par with the profit rates of commercial banks. As for the allocation to UKKM, for the information of the Honourable Member, KUSKOP through the Cooperative Commission and the Malaysian Cooperative Institute (IKMa) is always committed to helping strengthen the development of cooperative human capital through the establishment of UKKM. In 2021, SKM channelled funds totalling RM20 million under the Cooperative Education Trust Fund, namely the Cooperative Contribution Fund, to IKMa as funding for the development of long-term education programmes and research. Mr Speaker, Honourable Members for Larut, Hulu Terengganu, Betong, Permatang Pauh, Ayer Hitam, Semporna, Kinabatangan, Kepala Batas, Kubang Kerian, Padang Rengas, Tangga Batu, Besut, Kulim-Bandar Baru, Sungai Besar, Setiu, Shah Alam, Julau, Stampin, Tampin and Jeli have touched on the implementation of government policies such as e-Invoice and the coordination of the minimum wage that involve or affect local MSME entrepreneurs. The Honourable Members for Larut, Hulu Terengganu, Betong and Stampin are not in the House. The Honourable Members for Larut, Hulu Terengganu and Sungai Besar are still here. For the information of the Honourable Members, KUSKOP welcomes the coordinated, phased increase in the minimum wage, which will begin on 1 February 2025 and also on 1 August 2025, involving employers with fewer than five employees. In this regard, KUSKOP takes very seriously the impact of the increase on companies owned by MSME entrepreneurs. KUSKOP takes note that this increase in the minimum wage will generally certainly affect the cash flow and operating costs of their businesses. There is also a possibility of a reduction in hiring to ensure more effective costs, and companies are more inclined to hire contract workers rather than permanent appointments. However, in the context of KUSKOP, this situation will indirectly encourage MSMEs to pay attention to digitalisation and automation in running their company operations for long-term benefits. In this regard, KUSKOP is prepared to hold further discussions, especially with the Ministry of Finance and the Ministry of Human Resources, to elaborate on initiatives to help reduce the impact of the minimum wage increase on MSME entrepreneurs.
Honourable Minister, briefly. I request KUSKOP's firm position regarding the minimum wage of RM1,700. We know its impact is not merely on micro, small and medium entrepreneurs, but perhaps informal entrepreneurs also employ workers, and formal entrepreneurs also employ workers. This means two million entrepreneurs involving more than two million workers. Therefore, a firm position from KUSKOP is very important so that entrepreneurs down there know what
KUSKOP's actual position is, whether it is working or not in relation to this minimum wage? Thank you.
I think my position at this time has already been overtaken by the decision. This matter has been decided, so I am more inclined to look forward. I also want to ask the Honourable Member, if the Honourable Member agrees, whether these workers from your constituency enjoy a higher wage than the previous amount or not?
Honourable Member, we have to look at the entrepreneurs. We have to look at the entrepreneurs on the path forward with the present circumstances, with these very difficult circumstances, it may cause a difficulty for entrepreneurs in meeting this minimum wage. This may be my view.
Thank you, Honourable Member. As in my reply, my ministry and I are ready and will hold discussions with the Ministry of Finance and the Ministry of Human Resources to elaborate on initiatives for MSME entrepreneurs. We know that more than 1.1 million MSME entrepreneurs in our country employ around 48 per cent of the national workforce. Of course there will be an impact on their cash flow and operating costs. That is why I said at the ministry, following this decision, we will hold discussions with the Ministry of Finance and the Ministry of Human Resources to elaborate on the initiatives that we can extend to these MSMEs. Thank you. I think that is all, Honourable Member, just now Paya Besar...
I am waiting for this halal matter.
The halal sector, yes? The halal sector, I request to return to the halal issue. Mr Speaker, the Honourable Member for Paya Besar has put forward a proposal to strengthen the halal industry by focusing on high-value sectors and not only on the F&B sector. For the information of the Honourable Members, KUSKOP generally always endeavours to enhance the capacity of entrepreneurs and cooperatives in producing competitive halal products and services and to increase the number of entrepreneurs who obtain halal certification. In this regard, KUSKOP supports the development of halal entrepreneurs through the Halal Entrepreneurship Development Programme, which covers sub-programmes such as: (i) the Halal Industry Entrepreneur Capacity Development Programme; (ii) the Halal Product Capacity Development Programme; (iii) the Innovation and Technology Development Programme; and (iv) the Halal Entrepreneur Internationalisation Programme. As for the Honourable Member's proposal that focus be given to high-value sectors and not limited to the F&B sector, generally the implementation of the Halal Entrepreneurship Programme by KUSKOP is open to all sectors although
most products are food and beverages. However, the products produced have added value in terms of technology, such as the production and processing of higher-quality products. In addition, there are entrepreneurs involved in halal cosmetics, pharmaceuticals and manufacturing or OEM contract production who can also benefit from the halal development programmes under KUSKOP.
Tan Sri, a little, Tan Sri, even though it is already one o'clock. Honourable Minister, does your ministry have a view and proposal that one district, we gather these halal MSMEs to form a consortium, for the economy of scale, to access financing? Can we do one district, one consortium so that they have confidence and strength? Not only so they can venture into high-growth, high-value fields, but also have the capacity in terms of their capabilities.
Thank you, Honourable Member. At this time, we do not yet have a proposal to establish one district, one consortium for halal products in every district across the country. What we currently have is the One District One Industry Programme, which, among other things, also covers the development of products and services that can be halal-certified. At the same time, we also encourage this initiative at the level of the entrepreneurs themselves. If they can hold discussions among fellow entrepreneurs through business chambers, entrepreneur associations or through cooperatives, for example, we will welcome a proposal to establish a consortium provided it is driven by the entrepreneurs themselves, but I also take this from the Honourable Member as the Honourable Member's proposal for me to study and bring to the ministry. Mr Speaker, that is all my response to several matters raised by the Honourable Members. For those Honourable Members who were not in the Chamber during my winding-up, my ministry will provide a written response. I hope the explanations given can answer all the matters raised by the Honourable Members who are still in the House. We at the Ministry of Entrepreneur and Cooperative Development will carry out the mandate under this Budget 2025 with full commitment and responsibility in ensuring the sustainability of MSME entrepreneurs and local cooperatives. Thank you.
Alright, thank you, Minister. The time is 1.03 pm. I adjourn the Sitting. God willing, we will meet again at 2.30. Thank you.
[The Sitting was suspended at 1.03 pm]
[The Sitting resumed at 2.30 pm]
[Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair
I invite the Honourable Minister of Higher Education to respond.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings and Malaysia Madani greetings. Madam Speaker, first, allow me on behalf of the Ministry of Higher Education to record my highest appreciation and thanks to the Right Honourable Prime Minister cum Minister of Finance for the tabling of Budget 2025 on 18 October 2024. Based on the announcement of Budget 2025, there is an increase in the allocation given to KPT, namely by 10.76 per cent compared to 2024. For 2025, KPT has been allocated RM18,097,086,800, which makes its total operating expenditure and development expenditure. This indirectly reflects how important the role of this ministry is as a catalyst for the Ekonomi MADANI framework through the field of higher education. Therefore, KPT will continue to be committed to implementing various initiatives and programmes to support the achievement of the aspirations of Budget 2025, namely “Membugar Ekonomi, Menjana Perubahan dan Mensejahtera Rakyat.” Madam Speaker, throughout the policy debate session on Budget 2025 this time, various questions and suggestions have been raised by the Honourable Members of this esteemed House to the Ministry of Higher Education. On behalf of KPT, I record my appreciation to all 32 Honourable Members who debated matters and issues under the responsibility of this ministry during the Budget 2025 debate session. To respond to and comment on all matters relating to the Ministry of Higher Education that were raised during the debate week, I will group and elaborate on the main issues by topic to save time. Madam Speaker, regarding higher education reform. I open the winding-up session for the Ministry of Higher Education today by addressing the issue debated by the Honourable Member for Indera Mahkota concerning education reform. I thank the Honourable Member for Indera Mahkota, who is always alert and attentive to issues relating to the national higher education landscape. We are all aware that the world is no longer as usual, where the global environment is changing rapidly. Uncertainty in the world landscape shows that what
we previously considered normal is increasingly changing, including the higher education ecosystem. Therefore, it is important for us to adapt the national higher education framework so that it keeps pace with the changes taking place in the higher education landscape so that we do not fall behind. Thus, the Ministry of Higher Education is now actively developing the Malaysia Higher Education Development Plan, or PPPTM 2026-2035. In developing this plan, we also take into account the five frameworks proposed by the Honourable Member for Indera Mahkota in his debate. KPT also uses all reformative reports as the main input to develop PPPTM 2026-2035. Among them are the Report of the Committee to Review and Re-examine the National Higher Education Policy and Study, with permission, New Horizon for Science, Technology and Innovation - A Strategy to Enhance Higher Education in Malaysia. PPPTM 2026–2035, which is being developed, sets out 10 leaps and nine transitions or called game changers, with permission, important ones, among them are: (i) from structured education, with permission, to the approach of unbundling of education, with permission, which provides the opportunity for more individuals to obtain higher education through flexible education and lifelong learning; (ii) from producing graduates who seek jobs to graduates who create jobs with emphasis on humanity, future skills and sensitivity to the environment; (iii) from academics focusing on output to focusing on impact on society and the planet; (iv) from leadership and administration focusing on process to a more innovative approach; (v) from conventional and siloed higher education systems to one that fully uses the latest technology; (vi) from technologically literate individuals to competency in innovation and humanistic technology; (vii) institutions will adapt a new, more sustainable financial model; (viii) internationalisation of higher education not only focused on attracting international students, but will also involve the export of higher education overseas; and (ix) developing smart partnerships, that is changing from a silo working approach to a whole-of-nation approach.
I believe that what we are working on will create a more conducive, resilient and competitive national education ecosystem. Madam Speaker, when speaking about higher education, matters relating to academics and curriculum, lecturers and research are of course not overlooked. Throughout the 2025 Budget debate, the Honourable Bentong, the Honourable Shah Alam, the Honourable Paya Besar, the Honourable Temerloh, the Honourable Kemaman and the Honourable Indera Mahkota have given their views on these matters.
Thank you for the concern of the Honourable Members. I take note of the suggestion of the Honourable Paya Besar and the Honourable Shah Alam that we offer programmes or courses on halal management to local students as well as international students. For the information of the House, to date there are 37 halal programmes that have received full accreditation, covering levels from Diploma to Doctoral degree. A total of 13 programmes have received provisional accreditation and are offered by public higher education institutions as well as private higher education institutions. Most recently, 11 public universities offer programmes related to the halal industry, comprising courses at Certificate, Bachelor's, Master's and Doctor of Philosophy levels. For example, Universiti Malaya has just begun offering a Master's in Halal Management starting October 2023 under the Academy of Islamic Studies. In addition, UiTM also offers a Diploma and Master's Programme in Halal Management. The KPT (Ministry of Higher Education) welcomes the suggestion raised by the Honourable Bentong that certified courses related to autism be expanded to encourage more medical rehabilitation personnel. I would like to clarify here that the KPT, through the Malaysian Qualifications Agency (MQA), always encourages higher education providers to offer up-to-date and innovative programmes to ensure that the programmes offered are of quality and in line with current needs. For the information of the Honourable Members, at this time there are also six occupational therapy programmes at Diploma and Bachelor's Degree levels offered at UKM and UiTM, as well as three postgraduate programmes at UiTM. The KPT, through USM, UKM and UPSI, also offers a Bachelor's Degree in Education, namely Special Education. Meanwhile, a Master's in Special Education is also offered at UM, USM, UKM and UPSI. UPSI also offers a Doctor of Philosophy in Special Education. In addition, the Ministry, through public universities, always ensures that the infrastructure and facilities at public universities are comfortable and conducive for all students, including students with autism. At UIA, for instance, the Disability Services Unit (Unit Perkhidmatan Kelainan Upaya), or DSU, and counselling and career services always ensure that the welfare of students with autism studying at UIA is well looked after. So far, there are 20 moderate-level autistic students at UIA taking various fields such as in the field of
Islamic studies – Quran and Sunnah, and also in IT, engineering, architecture and others. Madam Speaker, in response to the Honourable Temerloh and the Honourable Kubang Pasu, regarding the restructuring of the fields offered at IPTs, including curriculum and engineering studies, particularly semiconductors, so that they are aligned with current workforce demands in the job market as well as industry requirements. I would like to share here that the KPT, through MQA, has developed quality assurance documents as references, standards and guidelines for higher education providers, or, with permission, education providers, in developing quality programmes. One of the quality assurance documents provided is the Programme Accreditation Code of Practice or, with permission, Code of Practice for Programmed Accreditation, which is the standard reference in accreditation assessment. Among the standards set before a programme is considered for offering is the requirement for the HEP to conduct needs analysis in terms of market demand studies and graduate employability. This is to ensure that the programmes offered are of quality and in line with industry needs. As for study courses under professional bodies, the offering of related courses must meet the criteria set by the Joint Technical Committee to ensure that the courses offered meet the Malaysian Qualifications Framework, or, with permission, Malaysian qualification framework. The Honourable Kubang Pasu also proposed close collaboration between IPTs and industry, particularly in the semiconductor field. For the information of the Honourable Members, the KPT is now holding engagement sessions with semiconductor companies in Malaysia to identify the specific knowledge, skills and needs of those companies. This effort will help improve the existing curriculum. It will also enable the Ministry to design interventions such as an industry talent boot camp, where students will undergo intensive training to acquire the required knowledge and skills. The students will then be channelled to those companies according to the knowledge and skills they have acquired. The Ministry of Higher Education, through USM, has also launched a pilot project, the MOHE Research and Industry-Infused Incubation, or MRI3 Programme. Through this initiative, a Universiti Malaysia Electrical and Electronics (E&E) Consortium, comprising 19 public universities, was established in 2023 and has signed MoUs with 27 companies from the E&E sector to develop talent with skills called, with permission, sharp skill and smart skill that are in line with the needs of the E&E industry, covering talent from the first degree level up to postgraduate level. In addition, on 25 June last, the KPT held a round table session with industry, namely the E&E Industry Dialogue with the Minister of Higher Education, with permission, in order to
obtain input and views on the needs and demand of industry for graduates produced by local IPTs. At the same time, we are also obtaining feedback for curriculum improvement so that it is better suited to industry requirements. Madam Speaker, now allow me to elaborate...
Can I ask the Honourable Minister – just a little, I'd like to ask for the floor. Thank you very much, Honourable Minister. The Honourable Minister of Higher Education appears to be very concerned. I am glad to hear about the initiatives that have been taken. However, what I mentioned earlier in my debate is also about the specific needs under the national semiconductor strategy announced by the Right Honourable Prime Minister, that is, we need 60,000 engineers in the semiconductor or chip field within the next five to 10 years. We face many constraints and challenges in addressing this issue. The first hurdle or challenge is the input to IPTs, particularly IPTAs, which comes from schools, and these schools must have sufficient numbers taking STEM. STEM is not merely general per se, but STEM, particularly STEM Package A – Pure Science in full. STEM Package B – Pure Science drops one subject and includes other subjects. These two are important for them to pursue studies in the engineering field. From the data I obtained from the Ministry of Education and also from the associations involved in this talent field, in 2022 we only produced those with Engineering degrees to enter this field, about 7,000 people, and if we take ten years back, the average was only just over 5,000, and we need 60,000. That is for semiconductors alone, but if we include EV, solar and so on, we need even more than that.
So, what challenges are faced by IPTs? Can't there be planning and strategies for us to address this issue? Because this need is very urgent, as we are all out, Right Honourable Prime Minister, the Minister of MITI is all out, going to look for investors, but if we do not have enough engineers to meet this need, they may look for other places. What are the planning and strategies of the IPTs, particularly IPTAs, to address this issue? Thank you very much, Minister.
Thank you, Honourable Member, for the question raised, and I think I would need a lengthy explanation as to what those measures are. However, in brief, allow me to inform you that firstly, we agree on the matter of manpower needs or talent development that is very much needed for the next 10 years. Not only that, we are also planning for the nearer term. As the Honourable Member mentioned, the figures he cited are one of the needs
of today, because the needs mentioned, the figure the Honourable Member cited, represent a long-term need. However, we also need to plan from now on. What are the actual needs? Therefore, discussions with industry are very important in this regard. As we are well aware, among the approaches taken by the government is through a co-dubble helix approach, that is, involving industry, involving the government, and also involving other ministries and all sectors, the four important sectors in industrial areas are combined and the needs at that time are identified. Secondly, it requires an overall system, that ecosystem, which does not involve only universities. We must understand the needs required in the E&E sector as well. It relates to the fields under the categories of Engineer and Technician, the technicians required. So all of these have been discussed, and the latest planning that needs to be done has been carried out. For example, as announced by the Right Honourable Deputy Prime Minister regarding the TVET programme, a comprehensive programme, and also the EV that the Honourable Member mentioned earlier. For instance, how 2,000 of our workers or those who are to receive training have been sent to China. These are among the measures we are taking. Thirdly, indeed as the Honourable Member also mentioned earlier, such matters cannot be addressed by only one party at the university and college level, but early preparation is very important, particularly what the Honourable Member mentioned earlier, STEM for example. That is a very urgent need. However, we also have several more creative approaches, including the package the Honourable Member mentioned. Those who perhaps enter the social science stream but have a good inclination in Science and Mathematics, which we are also trying out at certain polytechnics, to produce engineers relevant to the fields mentioned. Please.
Thank you, Mr Speaker. I congratulate the Honourable Minister on the explanation regarding education reform. As we have discussed before, we on this side have no problem cooperating, but I would like to continue and expand a little on the Kubang Pasu issue. Many of our students, graduates in certain fields such as accounting, engineering, architecture, but they do not complete the final mile or the last mile, with permission, they do not become AR, they do not become IR, they do not become Chartered Accountants and so on. Is there any tracer study to look into this, and these are mostly Malay bumiputera students. They are graduates, but they do not complete or do not take either professional papers and such. What encouragement is there from the KPT or the government? Thank you.
Thank you, Honourable Indera Mahkota. This is what is called upskilling processes, and in ensuring that those in professional fields receive recognition in their fields through professional accreditation, with permission. This is what we do because the foundation of education at university level is that we provide the basics, but for them to move forward, it requires from them, that is their capability, or certain groups join certain agencies. I will give an example, in the context of UiTM. UiTM is very clear, namely that those who take these professional fields will be encouraged through MARA, which will provide additional assistance to ensure that they can complete, with permission, complete the circle in the field they are in. That is among the other things being done. Thank you.
Okay. Minister, may I ask one question? Temerloh mentioned the UEC. What is the response of the KPT to the demands of certain parties that the government recognise the UEC for entry into public IPTs and also for civil servants? Because we know that in terms of co-curriculum, it is indeed conflicting or not aligned with the National Education Policy. Likewise in terms of the language used. It is not using Bahasa Malaysia, but rather Mandarin. Thank you.
I will try to answer the question as there are questions raised related to it. If the Honourable Member permits, let me answer the others first. As I mentioned earlier, if I may, I would like to go through the topics one by one. With permission, may I, Honourable Member? Yes, thank you. Madam Speaker, allow me to elaborate on the issue raised by the Honourable Mas Gading regarding the quality of programmes offered at private higher education institutions (IPTS). He stated that there are IPTSs offering diploma courses, but their quality is only at Skills Certificate or Pre-Diploma level. For the information of the Honourable Members, IPTS is regulated by this Ministry through the Private Higher Educational Institutions Act 1996 and its subsidiary regulations. This is to ensure that local IPTS can grow and provide quality education. Accordingly, IPTS must obtain approval from the KPT to operate a study course before it is offered to students. IPTS must also ensure that student admission requirements meet the minimum standards of the programme or the requirements of professional bodies and the MQA advice in force for student intake during that period, or other qualifications recognised by the government as equivalent to it. Madam Speaker and Honourable Members of the House, I now turn to the research issue debated by the Honourable Kemaman and the Honourable Indera Mahkota, which touched on grants and research funds for lecturers. The Honourable Kemaman suggested
the Honourable Indera Mahkota. Oh, he is not here. But Indera Mahkota is. Suggesting that such grants not be given only to a small group of lecturers. This Ministry always strives to improve research excellence at IPTs and has provided various research grants to lecturers that are not restricted to only certain groups of researchers. Among the research grants provided are the Fundamental Research Fund, the Research University Fund, the Niche Research Empowerment Fund, the Higher Education Centre of Excellence fund, and several other special research funds that are also regulated by the KPT. The granting of grants to researchers is based on complete applications that meet the conditions and criteria set by the KPT, and will undergo an assessment process to ensure that researchers who are eligible receive a grant.
The Honourable Indera Mahkota also raised a question regarding research funds received by the KPT and MOSTI. In the context of the Ministry of Higher Education, as I have stated just now, there are several education programmes offered. However, if I may understand what the Honourable Indera Mahkota was trying to convey, based on his experience in the ministry concerned, it is how we want to create mutual cooperation between the KPT and MOSTI. This was also emphasised by the Right Honourable Prime Minister from Tambun regarding education that has been carried out separately all this time, which can now be done together. God willing, this is a new approach that we will take to ensure that all programmes arranged and research carried out, for instance research carried out at MOSTI, will eventually return to universities, because most of it, I can say here more than 80 per cent of the basics will return to researchers and lecturers from universities. Madam Speaker, the Honourable Paya Besar has suggested that allocations be provided for training and skills development of lecturers. I would like to state here that at present there are four sponsorship programmes provided to lecturers at public universities, namely the Bumiputera Academic Training Programme Scheme, the IPTA Academic Training Scheme, Sub-Expertise and Postdoctoral programmes for lecturers to pursue higher studies. In an effort to uplift national higher education, in addition to enhancing the expertise and competence of public university lecturers in line with technology and
current needs, KPT intends to provide more sponsorship at the sub-expertise programme and sabbatical level in the future. KPT is currently reviewing the new offering facilities and eligibility requirements for postdoctoral programmes, which are not limited to permanent lecturers only. In addition, Honourable Paya Besar also proposed further strengthening collaboration between universities and industry. He also suggested that a special fund, Future-Ready Academia, with permission, be provided for lecturer development. I thank the Honourable Member for his concern regarding the skills development of lecturers and welcome the suggestions that have been given. For collaboration with industry, one of the initiatives currently implemented by KPT is the CEO@Faculty programme, with permission. In this programme, CEOs from private companies are appointed as mentors to universities to share industry knowledge, experience and expertise with lecturers and also students. To further enhance lecturers' knowledge, skills and experience in their respective fields, selected lecturers will be sent to industry for six months through an attachment programme. For example, Intel, Western Digital, Ericsson Malaysia and Cisco Malaysia. Mr Speaker, the next matter I wish to address, in answering the questions raised by Honourable Kluang, Honourable Sri Gading, Honourable Pekan and Honourable Batu Gajah, concerns TVET under KPT. As we are well aware, this TVET is under a ministry from Bagan Datuk, namely under the Deputy Prime Minister who chairs its TVET. Therefore, any programme arranged must be carried out jointly with other ministries, because under it there are several ministries that also plan and implement the agendas encompassed within TVET. In the context of universities, we understand that need, so universities must conduct a needs analysis through the Programme Accreditation Code of Practice, or what we call COPPA, developed by the Malaysian Qualifications Agency before a programme is considered for offering. Meanwhile, a Polytechnic Transformation Plan 2023-2035 and the Empowerment of Community Colleges have drawn up, with permission, a critical reform agenda specifically to empower TVET-industry synergy through the Technology Centres and Industry on Campus. Furthermore, the synergy between JPPKK and various agencies and companies such as MIDA, MITI, PERKESO and TalentCorp in channelling TVET talent to industry. At the same time, KPT has also appointed 20 members of the Industry Advisory Council, as well as the CEO@PolyCC and CEO@Faculty programmes as liaisons
collaboration with industry so as to produce a workforce in line with the current needs of industry. Mr Speaker, I thank Honourable Sri Gading and Honourable Pekan, who put forward the suggestion that extensive promotion be carried out so that there is no longer a stigma in society that regards TVET as a second choice. Honourable Batu Gajah, meanwhile, raised the question of the strategy to be adopted to strengthen TVET. This Ministry is indeed proactive in strengthening the national TVET ecosystem and ensuring that the programmes offered are aligned with the current demands of industry. Therefore, KPT has prepared a comprehensive plan to strengthen KPT's TVET through the provision of the Polytechnic Transformation Roadmap 2023-2035 and MTUN Termaju 2030. Honourable Batu Gajah also asked about the strategy to be adopted to expand industry training opportunities for students. This Ministry is always striving to strengthen and expand industrial training opportunities for students at local public higher education institutions. KPT has also introduced structured industrial training approaches such as the 2u2i programme, Work-Based Learning, with permission, and the Degree Apprenticeships Programme. To ensure students derive maximum benefit from the implementation of industrial training, the Ministry is currently in the process of improving existing IPTA industrial training policies in line with recent developments in the country's higher education system. Mr Speaker, I greatly thank Honourable Sri Gading, who suggested that skills development programmes with certification be introduced for workers who have the potential to grow in new industries, and who placed emphasis on members of the armed forces who have completed their service. For the information of the Honourable Members of this august House, KPT is always committed to empowering Lifelong Learning (PSH) for all levels of society, including members of the armed forces. Among the efforts carried out by KPT through the Malaysian Qualifications Agency (MQA) is that we are holding discussions with the Ministry of Defence. This aims to collaborate in developing a special project called Work-Based Learning (WBL 2.0), namely mapping programme curricula against the experience and service of members of the armed forces. Insya-Allah, this will help develop the skills of our armed forces members. Mr Speaker, allow me to touch on matters relating to students. This was raised by Honourable Kemaman, Honourable Temerloh and Honourable Tumpat. Honourable Kemaman and Temerloh touched on an important issue that should be given attention among our students, namely mental resilience and psychosocial support for students. Mental health problems among students at IPTs
such as depression, with permission, depression, anxiety or anxiety and stress, namely stress, are issues faced by students and can arise from various factors such as environmental changes, academic pressure, family problems and many others.
Therefore, enhancing psychosocial programmes at IPTs is an important step to ensure students are able to face learning challenges more effectively, such as counselling sessions, stress management workshops and early intervention programmes, which will help students manage stress and develop their self-resilience. Honourable Tumpat asked to what extent there is exposure to political and legal literacy and advocacy among students in line with their right to be voters and candidates at the age of 18. For information, in 2012 and also in 2019 the AUKU was amended to allow students to join and actively participate in politics, both on and off campus. This amendment is in line with the Undi18 initiative, which expands the participation of the younger generation in the democratic process, although the AUKU itself does not specifically mention the right to vote at the age of 18. With the existence of Undi18 and the AUKU amendments, students aged 18 and above now have the opportunity to be more active in politics, both as voters and in other political careers on campus. This Ministry is always attentive to students' right to vote. In the recent 2024/2025 academic session, students were given leniency to register late to provide them with space to vote during the recent Mahkota by-election. In addition, among the initiatives implemented by KPT are the establishment of Voter Education Clubs at public universities, political literacy education programmes at IPTs, and the Undi18 empowerment convention which was held last March. The establishment of a campus Election Committee or the MPP Selection Committee that functions like the Election Commission and is fully run by students. Madam Speaker, I now move on to matters relating to the establishment
The Minister asks for permission briefly. Asking permission from the Deputy Speaker, I would like, if possible, to welcome the presence of the Selangor Women Leaders Academic Group. A total of nine people came to visit and they are women selected to go through a programme under the Selangor State Government. Thank you... [Applause]
Thirty seconds, Mr Speaker. If possible, not today, but perhaps at another opportunity. If the Honourable Member could explain to the House about a programme the Honourable Member developed himself, I don't remember the term he used. The agenda to empower students holistically
and so on. That is related to the earlier answer regarding democracy and so on.
Honourable Speaker, I want clarification and explanation. Can a Member of Parliament stand up to interrupt a Minister to welcome guests in the House? It has become a common practice in this House. It can actually be done, one may give way to any Member of Parliament who stands up or give way to a Minister to welcome guests, in fact. So, if that becomes a tradition, it becomes a convention.
Actually, it is not only over there, it also happens over here.
Yes. That is what I am saying. Will that be made a convention in this House, Honourable Member? Thank you.
Next time, ask for something else to welcome the presence.
Yes, I welcome all the ladies... [Applause] [Laughter] Thank you. As for the question raised by Honourable Indera Mahkota, God willing, there may be another occasion where I can explain in more depth what we are doing. Among other things, we continue to be under interacting with them, giving them space to voice their views. So there are no movements trying to restrict student movements from any party whatsoever. Madam Speaker, I now move on, I have two left, can it be a bit longer? Moving on to the establishment of new public higher education institutions which were debated by Honourable Semporna, Honourable Semporna is not here today. Honourable Tumpat, Honourable Tawau, Honourable Labuan, Honourable Kota Belud and Honourable Betong. Honourable Semporna, Tumpat and Tawau proposed that they be built at IPTAs in their respective areas. The Ministry has always been committed to providing access to education to the people through the establishment of IPTAs encompassing public universities, polytechnics and also community colleges. However, the establishment of any new IPTA must be thoroughly examined from various aspects: (i) current demand encompassing the needs from the perspective of students and society, which must be balanced with the size of the population or inhabitants; (ii) the adequacy and availability of expert manpower supply in a field; (iii) the ability to provide and properly maintain infrastructure; (iv) financial sustainability; (v) the prospects and types of programmes to be offered;
(vi) risk of duplication, overlapping, with permission, and any mismatch with existing IPTs and programmes; and (vii) programme offerings that can be implemented virtually. Regarding Honourable Semporna's proposal for an IPTA to be established in the Semporna Parliamentary constituency. I would therefore like to draw the attention of the Honourable Member that Universiti Malaysia Sabah (UMS) has drawn up plans to expand a new learning centre in Semporna, under the UMS Flexible Education Centre. Among the programmes that will be offered are the Tourism Management Programme and the Aquaculture Programme, and including if there are needs in fields related to food security or in agriculture, food and others. However, this matter is subject to further discussion with the ministry and the relevant agencies, including the Ministry of Economy. For the time being, there are also several IPTAs and branches of public universities in Kelantan and also in Sabah. I also wish to emphasise that the trend in offering higher education facilities at present is hybrid, namely physical and virtual. This means students can follow their studies anywhere without having to be physically on campus.
Honourable Minister, I give you an additional five minutes. After that, for those that were not answered in time, please provide written answers.
Minister. May I request the answer that was postponed earlier for Temerloh?
Yes. I will try to obtain what was raised by Temerloh and also several others. Yes, let me finish some of the answer here. Among those mentioned was from Betong earlier. For the information of the Honourable Member from Betong, the existing polytechnic will be upgraded to a conventional polytechnic status, because previously the Polytechnic in Betong was only a small metro-scale one, and we are drawing up plans to upgrade the existing polytechnic in the Betong area. I also wish to take note of other matters raised here, including matters related to tuition fees, the admission of students to IPTAs, and also the issue of the AUKU, PTPTN, scholarships and assistance for students facing financial difficulties. Allow me also to answer the matter relating to UEC as one of the requirements for admission to IPTAs. This was raised by the Honourable Member from Raub and also Honourable Temerloh. The Ministry takes note that there are students who hold UEC qualifications who intend to continue their studies at IPTAs.
However, based on the Circular of the Chief Registrar of Private Higher Education Institutions, KPM Number 2 of 2004, UEC certificate qualifications can only be used for admission to IPTS. Honourable Temerloh also asked about this, including, among other things, what was raised regarding the number of students classified as the T15 group at IPTAs...
[Bangun]
For the Honourable Member's information, where is Temerloh? Is he here?
Menteri?
Just a moment, I will give it. The system that we have at the KPT level records the enrolment of citizen students by household income group B40, M40 and T20 at IPTAs, which encompass public universities, polytechnics and community colleges. The IPTAs, which encompass public universities, polytechnics and community colleges, are based on the MyMoheS system; the enrolment of citizen students by household income in 2023 was actually mostly from B40. For example, I take the context of public universities. We have a total of 361,000, which is 64.4 percent of the total. Meanwhile, at polytechnics, we have 60,831 or 76.5 percent from B40, and at community colleges, we have 12,596, which is 75.8 percent of the total. Honourable Member, please.
Okay. Thank you, Honourable Minister. I want to touch briefly on the UEC issue. Although the schools referred to as UEC are private, we know that this is a system that has long existed in Malaysia. Most UEC students not only take the, what is this, certificate, certificate for UEC. But they also take the SPM examination. One. Second, most of them, our children, these students, are recognised by universities abroad. Most of them after SPM or the UEC certificate, study abroad, and they are absorbed as quality human capital overseas. One. Second, what is the Minister's view, the Sarawak State Government not only accepts but also recognises it as an entry requirement to universities in the state of Sarawak and is also permitted for recruitment into public service positions. What is the Minister's view?
Honourable Minister, please wind up.
Do I have to answer? No need? I will answer later, yes. I think Honourable Member, as we are well aware, this issue has dragged on for a very long time. Whether those here are here or those over there are
over there, yes. Until now, a continuing issue like this should not require being played up excessively for certain factors. For me, it is better that we look into this aspect deeply, not only in the context of me. If asked to me, the issue related to accreditation, with permission, for certain certificates, for me is not only focused on one certificate. We also need to look at what other certificates are obstacles for our students, our children, our people here, to enter institutions of higher learning. Therefore, I recommend that a comprehensive study be carried out, including in terms of the content of the existing curriculum. So, I hope that issues like this, we do not discuss them or according to certain seasons in order to seek, as people say, support and backing, but this is an educational issue that requires thought and consideration from all of us. Thank you. Madam Speaker, I apologise to all the Honourable Members, there may be matters that I did not have time to answer, and for those that I did not have time to answer, the matters raised will be followed up with written answers. Once again, I appreciate the questions raised by all the Honourable Members in the debate session, specifically those related to the Ministry of Higher Education. Thank you, Madam Speaker.
Thank you, Honourable Minister of Higher Education. Now I invite the Honourable Minister of Agriculture and Food Security to respond. Time 45 minutes.
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace. Greetings to Malaysia MADANI. Mr Speaker and respected Honourable Members of the House, thank you to the 44 Honourable Members who took part and debated matters under the purview of the Ministry of Agriculture and Food Security. Throughout the debate that took place, I greatly appreciate the views and ideas raised by the Honourable Members. This debate shows that all of us, regardless of political background, are deeply concerned about the need to ensure the stability and sustainability of the nation's agricultural sector. National food security does not rest solely on the shoulders of KPKM but also involves various ministries. Among them are the Ministry of Finance, the Ministry of Economy, the Ministry of Domestic Trade and Cost of Living, the Ministry of Territories and the Ministry of Plantation and Commodities.
For the information of Honourable Members, the Government, through Budget 2025, has allocated RM6.42 billion, an increase of RM250 million or 4.1 per cent compared with 2024. For today's winding-up session, I will respond to and give my views on the issues raised during the debate, based on the main areas of responsibility and sub-sectors under the Ministry of Agriculture and Food Security (KPKM). The first is increasing paddy and rice production. Second, the allocation of RM300 million for cooperation with state governments. Third, focus on the welfare of the ministry's target groups. Fourth, development of the livestock industry. Fifth, implementation of policies and strategies for domestic productivity, and sixth, cultivation of onions, maize, grains and vegetables. If I am unable to answer, I will reply in writing to every Member of Parliament who asked.
Those who are not in the House will receive written replies directly.
It seems there are plenty of them here. Many from the previous ministry were absent, so it finished quickly. This one, it seems everyone is present, including the Deputy Prime Minister. With your permission, I will respond to the questions raised by the Honourable Members for Jelebu, Rompin, Sri Gading, Jeli, Rasah, Pendang and Mersing regarding efforts to increase the country's paddy productivity. For the information of Honourable Members, on 7 August 2024, I directed that a special task force on paddy and rice industry reform be established at KPKM, with the aim of examining the weaknesses in the paddy and rice ecosystem and proposing improvements that can be implemented immediately. This is in line with the call for institutional and industry reform desired by the Honourable Prime Minister, particularly to resolve strategic issues in the country's paddy and rice industry. On 9 October last, I made a major announcement on paddy and rice industry reform involving four main initiatives, namely a review of the price structure for paddy and rice, the introduction of a regulation prohibiting the mixing of local rice and imported rice, the separation of functions and powers of the institutions involved in managing the paddy and rice industry, and the strengthening of regulation and enforcement of the industry through strengthened regulation of paddy and rice.
Various paddy productivity acceleration programmes have been and are being implemented by KPKM as a continuous effort to increase paddy output and local rice production, such as SMART SBB, SMART SBB ala Sekinchan and so on. Among the current achievements of this initiative are KPA Gong Chengal, Gong Pasir and Gong Geduk, which are supervised by IADA Ketara, Kemasik. One success in Kemasik, Pasir Puteh, has produced 10.35 tonnes per hectare. This is on par with Sekinchan. When I made a speech during a visit to Pasir Puteh recently, I said, "In the future, if you want to see the most beautiful paddy, there is no need to go to Sekinchan, go to Pasir Puteh." And this venture is 100 per cent bumiputera. In other words, the bumiputera of Kelantan
can produce as Sekinchan does. 10.3 metric tonnes is a very good achievement, and they are now working on the second season. If this success is repeated, perhaps in the future we can carry out paddy cultivation in the Kemasik, Pasir Puteh style. However, at present, the country's capacity to produce rice is 1.44 million metric tonnes, or 56.2 per cent of the national rice supply. Meanwhile, the balance of 1.12 million metric tonnes still has to be imported from abroad. Therefore, the ministry welcomes any long-term proposals aimed at increasing local paddy and rice productivity, particularly to reduce the impact of the agri-food trade deficit. Regarding the programme of five paddy planting seasons in two years raised by the Honourable Member for Beluran, the Honourable Member for Pokok Sena and the Honourable Member for Sungai Besar, the ministry has completed a pilot programme at MADA in 2022 and it has proven to have high potential for increasing paddy yields as well as the income of paddy farmers. However, implementation of this programme requires thorough preparation on the part of the Government, covering input management and the readiness of industry players, including the paddy farmers. At present, full preparations for this effort are being vigorously carried out by the ministry, including the development of phase one irrigation infrastructure at MADA, which involves the comprehensive rehabilitation of Empangan Pedu and the construction of 15 tertiary irrigation blocks covering an area of 11,000 hectares, and is expected to benefit 5,000 paddy farmers. For the information of the House, the Sarawak Government has proposed the development of an area of 5,000 hectares as an effort to make this state one of the country's main rice granaries. This move has received serious attention from the Federal Government. This project has been launched through implementation by FELCRA Berhad under the supervision of the Ministry of Rural and Regional Development, with the cooperation of the Ministry of Plantation and Commodities.
Honourable Member, I would like to seek clarification. Just a little. Because the Honourable Member has already gone up front. That one, which I...
[Bangun]
The Honourable Member has gone to the front, so I want to go back a little. The proposal is five times a year, five times in two years? Five times in two years, is it? Five times a year is already excessive, I apologise. Because the Honourable Member was once Minister of Home Affairs, and today is agriculture. I find it difficult to ask a question, so okay, Honourable Member. Are you aware that the land in MADA is already old? It is perhaps more than 70 years old, perhaps 80 years. Before independence it was used, and until now it has never been given a rest. So, the Honourable Member proposes even more than that, and I support it. But, once this land is given a rest. Like when planting sugarcane,
after 10 years, you change it. But we have gone 80 years without ever letting it rest, and this land is getting worse and worse, because of the use of pesticides and so on. That is why, if we enter the MADA area, our feet sink above the knee. The feet sink. So, we only endure. At present, all levels are only able to obtain 1.5 tonnes per serelong. So, the Honourable Member mentioned high yields, in some places that easily get water, okay. But, overall, that is what we get, 1.5 to two tonnes. So, does the Honourable Member intend to rest the MADA land for two years? And the Government pays everything. But, the Government does not need to pay at all. The subsidy that exists is given to the farmers, and the farmers rest the land for two years to plant other crops besides paddy so that the land becomes strong again. So, when a person reaches 70 years of age, they can no longer bear children. Something like that. So, if we force paddy, using fertiliser and pesticides, it still cannot endure because the land has been used for far too long. Thank you.
Yes, I support the ministry's intention to increase local rice production. Lately, our production has declined. Although it was once said to be 60 per cent, now is less than 60 percent of SSL. That is the fact. The ministry needs support from all parties. The private sector and the Government. If we want to do this five-times-two approach, a large part of the dams and drainage in the current granary areas needs to be rehabilitated. The allocations made piecemeal at present, coming in RM100 million, RM1 billion, RM500 million, are insufficient to rehabilitate the entire irrigation system required to rehabilitate the existing drainage and irrigation system. That is one thing that needs to be done.
Ringkaskan.
Another matter, Datuk Menteri. The ministry has the capacity to improve paddy seeds. MARDI, the Malaysian Agricultural Research and Development Institute (MARDI), needs to be allocated funds to conduct thorough, detailed research to produce higher-quality paddy seeds. In Sekinchan, at one time, Honourable Minister, Speaker...
Be brief. Do not take up the Minister's time.
Yes. Sekinchan, before this, had the highest production. But, lately, they have also dropped below 10 tonnes because of the use of adulterated, overtime hybrid paddy seeds. So, that is something that needs to be addressed. KPLB's announcement to develop this Sarawak land for paddy, how many times has it already done so. Previously, KPLB also announced it would develop a new granary in Sabah, but we have not seen this intention followed up with action in terms of the allocation and funds required. Thank you.
A little, Honourable Minister. May I? Sekinchan. Sekinchan.
Yes, yes. Sabak Bernam.
Sabak Bernam.
Sungai Besar area too.
Sekinchan has been mentioned many times, Mr Speaker. When speaking of the five-times-two-years approach, my question concerns paddy varieties. In terms of our preparation, infrastructure, okay, perhaps it is in the plan. But, in terms of our paddy varieties, if we follow Thailand, it is between 80 and 85 days. Vietnam, 75 to 80 days. But we are at 110 to 120 days. So, if we want to achieve the five-times-two-years level, our paddy varieties must match the maturity period of paddy in Vietnam, Thailand or Indonesia. Thank you, Honourable Minister.
Terima kasih.
Honourable Chairman.
Oh, it seems the group did not answer me.
Never mind if they did not answer, they do not want to. I will take it that we have answered.
Never mind. Go ahead. This is Bagan Serai, also a paddy area. Yes.
Thank you, Deputy Speaker. Thank you to the Minister.
Be brief, yes. This is not a debate.
The question concerns our intention to encourage these farmers to plant paddy. But, the reality on the ground, as we see it, is that farmers today are in fact at the poverty level already. If they give up, they will leave. In my area, many paddy fields have already been converted to oil palm planting. Let us look at his example. Good. Regarding the controlled retail price of seeds, in 2023, RM2.25 per kilogram.
Then, at the same time, we can see the Paddy Price Subsidy Scheme of 36 sen. Coming to 2024, the controlled retail price of seeds has risen again, to RM2.80 per kilo. Whereas the Paddy Price Subsidy Scheme has only risen by 26 sen, that is, 50 sen per kilo. The controlled price of seeds was previously RM2.25, and has risen to RM2.80, an increase of 55 sen, whereas the subsidy has only risen by 26 sen. So, how can we see this? This does not yet include inputs such as fertiliser, pesticides and so on, that is one point. Secondly, regarding the provision of subsidised seeds. The Government gives RM20.60 per bag for 20 kilos of seed to these seed providers. We know that these seed providers already receive RM20.60 per bag even though they are supposed to
sell at the set price of RM32. But in the market out there, it is RM58 to RM60 to farmers. My question is that there are farmers who have their own innovation, who produce their own seeds, although in fact illegally, it is not permitted, we know that. But they are forced to do so because the seeds they obtain are of no quality. Yet those seed providers receive a subsidy of RM20.60. The farmers who produce their own seeds receive nothing. So, this is an issue that needs to be considered if we want to talk about reform, Honourable...
[Ketawa]
One day we gave a talk on a stage. [Laughter] Arau, to rest the land, we must look at new technological developments that we are trying to find ways to adopt. The views of universities, the views of MARDI, the views of Universiti Putra on land and so on, we must take into account. Likewise, we look at the most advanced agricultural countries in the world, namely Taiwan and the Netherlands. They do not rest the land at all. Rather, new technologies have been introduced. Now, we will move towards that. Indeed...
Just a moment, Honourable Member. The state that the Honourable Member mentioned, it rests the land by substituting other crops. I stayed in the Netherlands for two years, studying for my master's there, I know that they rest the land, they change it. They change to other crops. They do not use the same crop because they want to give it a taste. The land gets to experience something new.
It is fertilisation, technology for example in Bumbung Lima. Among the old areas. The land there is not rested, but Bumbung Lima is among the areas with high paddy output, like in Sabak Bernam. I mentioned earlier, in Pasir Puteh, in Kemasik here, reaching as high as 10 tonnes. Likewise at the Kedah-Arau border, which also yields 10 tonnes because of the method of production and the method of management. Jerlus has many causes.
[Bangun]
Among them, we use machines to harvest paddy, and those machines are too heavy. Now, a process is underway to replace the paddy harvesting machines with lighter ones, and other matters, while the universities are giving their views so that this land is not rested. If we were to rest the entire MADA area for two years, I think the subsidy budget to farmers would certainly amount to billions of ringgit. We have to look at it from the perspective of the Government's overall capacity.
Parit Buntar.
Beluran gave a view that – Former Minister, indeed gave a correct view, namely the matter of infrastructure. Infrastructure is something on which we need to spend heavily. It appears to be a loss, but it is for the long term. We go to Kota Belud, for example, and ask them to cultivate twice a year. They say, "However many times, as long as there is water. There is a water source and so on."
Therefore, Beluran supports me that we should press in the upcoming Malaysia Plan (RMK) for the allocation for this irrigation to be increased, especially in the areas we are only now going to open up, such as in Sabah and also in Sarawak. I support the view of Beluran.
Parit Buntar, interjecting.
This has not yet been answered.
Parit Buntar is also a paddy area.
The Honourable Member from Bagan Serai has still not been answered.
Never mind, I will answer all of them together later. Never mind, all together, just briefly. Just briefly.
Bagan Serai will be angry with me. He will say, "Why are you indulging the younger one?" [Laughter]
Never mind. Just briefly. Just briefly. In the last sitting, Kota Raja answered regarding the issue of land to be rested due to the jerlus problem. So, Kota Raja replied, "It can be rested for one season or two seasons, and compensation will be paid." Today, the answer is different. Why? Today, reference is made to other countries that do not rest their land. Before it was possible, why is it now not possible?
There is an allocation for jerlus land in the Kerian area. I will reply in writing. Yes, this year there is an allocation for compensation for jerlus land in Kerian.
Okay, thank you. I will wait.
If you are asking, let the person answer completely first. This is that part.
I have already said thank you.
So, the matter of paddy seeds and so on is an ongoing matter, and we take such matters seriously. Regarding the shortfall of paddy areas, we have lost 20,000 hectares, Bagan Serai. Among the reasons, land has been converted to other crops, housing, and left abandoned because the younger generation does not want to continue paddy work. Therefore, we are now focusing on restoring that situation. Among them, in places such as Melaka, Negeri Sembilan and Johor, and we want to restore this together with the state governments. Recently I went to Melaka, and the Chief Minister and his Excos also promised and joined in restoring those abandoned paddy fields, whose total area is quite large, which can accommodate paddy cultivation in the future.
Regarding the 56 per cent decline in paddy and rice now, because the Department of Statistics Malaysia (DOSM) asked that the calculation be done in a new way, namely that seeds are not included in the rice category, so those items are subtracted. Hence, we are left with 56 per cent. That is why intensive efforts are now being opened up in particular areas, mentioned in three states, in Sabah and in Sarawak. I mention Sarawak here because its Premier himself announced an allocation of RM500 million next year specifically for paddy, and KPKM will continue to cooperate in any form to realise it, namely that Sarawak will open 5,000 hectares of paddy fields in the very near future. Sarawak is determined to be able to export rice by 2030. That is a resolve; whether it succeeds or not depends on our joint efforts. The Government has noted the concerns raised by the Honourable Members for Beluran, Rompin, Jerai, Arau and Julau regarding the paddy purchase price and the price differences between states. The minimum paddy purchase price is now set at RM1,300 per metric tonne, and this implementation also covers the states of Sabah and Sarawak with effect from 15 February 2024. I wish to emphasise that this price setting is a strategic measure to protect the interests of paddy farmers. Nevertheless, the price differences between states are business decisions based on local market dynamics. To address the concern as to whether the Government intends to harmonise the selling price of paddy across the country, the Government is considering this proposal, and a detailed study on the new price harmonisation will be finalised in the very near future. This study aims to ensure price stability for paddy in all areas and helps to increase the income of paddy farmers in a fair manner.
Laluan, Jerai.
Whatever changes there are, we must prioritise the paddy farmers, Arau. I guarantee that.
Whatever changes there are, it is the paddy farmers who will bear the burden of the losses. So, we will look at that matter seriously so that – Jerai.
Yes. Thank you, Minister. Regarding the price of padi, some private millers have raised it to as much as RM1,800. When I asked the KSU, he said, "We are the ones who control it." But private millers raised it to RM1,800, and at one point it dropped back to RM1,300. What steps has the ministry taken to deal with this recent issue of price increases?
That is what I said: this is a major reform in the padi sector, which we are carrying out now together with other agencies such as MyCC, which has also been conducting a study for more than seven months and will release the results of its study. We are taking those views into account to carry out a major reform. We hope all Members of Parliament will support it. This is for the benefit of the padi and rice industry in Malaysia.
Honourable Minister, the floor price of padi, the weight of padi, is at a rate of RM1,300 per tonne. That is what the ministry has determined since before my time and up to now. But millers buy at RM1,800, which is not logical. But in terms of business it is logical, although in terms of common sense it is not, because the padi that is bought, local padi, is converted into imported rice. The ministry must check that. It is very simple. Why buy at RM1,800? Because the padi, the local padi, is not sold as local white rice but as imported white rice. The ministry must check this. Enforcement under the Rice Division, 160 officers, is not enough, Honourable Minister.
[Bangun]
It must be thorough. A thorough investigation must be carried out. It is very simple. A business argument is possible, but logically it is impossible, because RM1,300 of rice would be sold at RM2.60 per kilo. So that is why there is no RM2.60 rice. They buy at RM1,800, RM1,400, and sell it as imported white rice at RM30 to RM40 per kilogram. Does the ministry know this, Honourable Member?
Yang Berhormat.
It seems the person asking knows how I am going to answer. [Laughter]
Honourable Member, thank you...
Because this is – yes, yes. Arau.
Thank you. We will support it. What? Reformasi or revolution? Oh, reformasi. Because the reformasi that failed before, why? PAS went to fight at the front, and someone else became Prime Minister. Is that the reform you mean, Honourable Member? Padi reform. Okay, Honourable Member, before the study is carried out, I am worried the study will not happen until who knows when. But I ask, because I have seen RM1,800 before my own eyes. I am also a padi farmer, but I did not take the money, I gave it to others. That is all. I am also a padi farmer, Honourable Member. They bought at RM1,800, but after three weeks it was RM1,400. RM400 less. The people who were fortunate were the people of Perlis, because at that time it was RM1,800 in Perlis. The people of Kedah were the least fortunate. When they began harvesting, it was RM1,400. So, I pity the people of Kedah. They were hit from left and right. So, Honourable Member, I want to propose that before this reform begins, they should receive RM1,500 straight away. Minimum wage RM1,700. So, we would be in the middle ground. No problem. Because the minimum wage is going up, match the minimum wage, raise the floor price to RM1,500. No problem. This is a proposal from many parties. Thank you.
Thank you, Arau. Actually, the sudden drop in the padi price came after I announced last October that we would carry out a major reform...
...a huge reform. So the price of padi, the purchase of padi, fell from RM1,800 to RM1,400.
Yang Berhormat.
Ini bermakna...
Honourable Minister.
This means they are a little afraid of this Minister.
Honourable Minister, the increase by these private mills happened twice, in two seasons. It went up to RM1,800, then it fell. Then in the second season, it went up again to RM1,800, then fell back again. I think they did not follow this Minister's announcement at all, they simply do as they like.
Yes. That is why we will carry out...
Yang Berhormat.
A major reform...
Kota Raja.
A combination of the Ministry of Domestic Trade and Cost of Living (KPDN) and the Ministry of Agriculture and Food Security (KPKM) will carry out this reform. People say whether carrying out this reform can be completed or not; we will try. Because with this padi matter, from LPN in the past to BERNAS, now there are various problems. It is always turbulent, this padi matter. Other matters can be said to have a visible end to their solution, but this padi matter is not so, because there are parties with power, the government side. There are parties with power in determining prices, there are distributors, there are growers. We have to combine all of these, to make one thing which, though slow, we must strive for so that in the end everyone benefits. It seems Members of Parliament agree that the price of rice needs to be reviewed. RM2.60 in 2008, now should we keep that price? We will also take the views of MyCC, which conducted the study, interviews, and engagement with many parties. Once their report is complete, it will be tabled at the nearest upcoming meeting. From there we will move and act to reform the padi and rice matter thoroughly, on a major scale. Bagan Serai, yes.
Mr Speaker and Honourable Minister, my question relates to the matter at hand today. My constituency produces 60 per cent of padi output. Suddenly local rice is not available. Okay. When people are afraid today, which causes prices to rise, padi also falls to RM1,400. My question is, is it really so difficult to tackle this? I think the simplest thing is, we know that if we go to the mill, because every padi seller, the farmer just now, must have a note to the miller. An invoice. Because he wants to claim the subsidy. We can ask the mill owner, "Where did you put this rice, this padi?" That is where we can catch him. So later, the Minister will certainly answer, "We do not have enough enforce-
ment officers." True. We go only occasionally. If it seems they have no capacity, we, the Members of Parliament, we from PN, are ready to go to the mills over there. [Applause]
Congratulations, Bagan Serai. Later, when I rush into any mill, I will call Bagan Serai, and they will not come to guard it. [Laughter] We know that from the perspective of power, the ministry acknowledges it. That is why in this reform we want to combine all enforcement officers under this ministry into one. Whether from MAQIS, from the Padi and Rice Division, from LKIM, from all of them, we will combine them, and we will have many enforcement officers who will act. I am confident Beluran can understand this matter, this matter of enforcement officers. But this enforcement matter that we want to carry out must also have balance.
[Bangun]
In this matter we want farmers to profit. We want millers to profit too. Distributors also profit. Consumers must not be burdened. That is why we have to look at it from all angles so that everything is win-win. We cannot take one action that benefits only one party. Let all parties gain. Let me change the subject a little. Oh, this is Pendang, the floods that sit and brood.
May I, Honourable Minister?
Twenty minutes left.
Thank you, Honourable Minister.
Nothing else is going in today.
I think the Minister is the most open and very considerate...
Ringkaskan, ringkaskan.
Minister of Agriculture and Food Security.
Straight to clarification.
I thank you because I see other Ministers did not give us permission to ask questions. But the Minister from Kota Raja is very good, very kind. I think keep that, and it will rise again, God willing.
No questions? [Laughter]
My question now is, I want to touch on the business strategy model under this Ministry of Agriculture and Food Security. I see that when rice prices are high, wages also rise, but the price of padi bought from farmers falls. So, this means that the one bearing the burden of everything that causes this inflation is the farmer; the farmer bears the burden of what happens here. In economic theory, when civil servants' wages and so on rise, of course goods will rise. But the farmers who produce padi do not rise. Where do I see the cause? Perhaps the cause lies with the millers. That is where we need to...
...determine how to coordinate the balance of padi and rice prices, and also the wage increases that cause inflation in the country, so that we can control the inflation that is happening. One of these segments is from agriculture, from this padi and rice.
I agree. It seems Pendang supports me in wanting to coordinate the price of rice, so that when we make a change later, there will be no noise here, everyone saying, "This is our view. Even though from the opposition, the Minister of Agriculture and Food Security listened to our views," meaning that a little change happens at that time. This is what we want to happen in this Parliament.
Menteri, sikit.
Because I was also an opposition member for a long time.
[Mr Speaker presided over the Sitting]
Briefly, briefly only. My question is brief, Speaker. Why was local white rice available during the by-election and also during the Jualan Madani? At other times it was not available. Why was it only available at that time? Thank you, Mr Speaker.
This is a matter of enforcement. When the government asks, they must comply. When the government does not ask, even mixing rice and so on.
Great Minister, answer sincerely.
Sincerely. So I say on rice, padi is complicated, but it can be solved, it is not impossible. I said earlier that, for example in Pasir Puteh, we can get 10 tonnes. If that approach is carried out throughout Malaysia, seven tonnes per hectare, we would have enough rice in Malaysia. But we know, most of them are there, not all padi farmers are diligent. But there are those who do it the "4T" way: plant, leave, harvest, telephone to ask about the subsidy. So if padi fields are run the 4T way, good yields cannot be achieved. But when we focus, even in places that were not high-producing areas before, for example in Pasir Puteh, it rose from three tonnes to 10 tonnes. This means per hectare it is possible. This means the bumiputera can do it, but focus must be given. If we plant, then say padi farming is a loss, padi farming is a loss. Bangladeshis take the profit. What if these Bangladeshis, having already dominated vegetables, soon dominate padi fields too? Because in Cameron Highlands, we know their growers, their distributors, the sellers in Selayang too, they control it all; they have already controlled the supply chain through their diligence. So we have to look at this in this way, critically from within. Why have we failed? When we go down, we make efforts, we see it increasing. That is why I view this padi matter
seriously, because we grew up in the padi fields. I used to ride buffalo, I understand. I also rode cattle, which created a stir in Parliament that day. Next, YB Bagan Serai, YB Rasah, YB Pendang and YB Jeli raised questions about the shortage of local white rice supply that I mentioned just now. Enforcement must be strengthened from time to time. This time, when there are stronger actions... because when I was Minister of Defence before, the first thing I did was summon Tan Sri Ambrin Buang to set up an Investigation Committee. The whole investigation was completed in one year, then our government fell. This front bench is the one that toppled it. Now we want to set up this committee, we want to carry out reform. Please do not let this government fall before the coming general election. [Laughter]
Then it fell again. [Laughter]
So we have completed all the studies, wanted to implement, and it fell again. Not this time, God willing. You will see, Members of Parliament will see our success after this. For the information of this august House, based on the views of industry players, the main challenge causing the shortage of local white rice supply in the market is the controlled price of local white rice, which is not competitive. Since 2008, the ceiling price of local white rice has been set at RM2.60 per kilogram to ensure the people get rice at a reasonable price. At that time, the price per tonne was roughly RM900; now it is set at RM1,300. Should we keep RM2.60 per kilo? I cannot say today; the study is being carried out with various parties, engagement is being conducted, and MyCC's views, whose study is complete, will be presented to us. As a long-term solution...
Yang Berhormat.
...KPKM is of the view that a review of the ceiling price of local white rice is warranted to be implemented.
Yang Berhormat.
This is Pendang's view. Although this proposal is still under detailed study, the Malaysian Competition Commission (MyCC) has completed its study report on the padi and rice industry, and it has been informed that this report will be tabled at the upcoming meeting of the National Food Security Policy Cabinet Committee (FSCC). KPKM is committed to examining the results of this study as well as the recommendations put forward, in the hope that the reform of the padi and rice industry can be implemented comprehensively.
Honourable Member. Honourable Member.
Thank you, Honourable Member, former Minister of Agriculture.
Soal...
Okay, okay, okay. Before that, before that, please sit down for a moment. Please, everyone sit. Beluran knows, and everyone knows too, that when the Minister is winding up, new matters cannot be brought up, yes. It is not fair for the Minister to respond to new things. That means the Minister comes to answer the questions that were raised in the earlier debate. So if you want to stand and ask, it is only for clarification. But do not bring up new matters. I apologise.
[Bangun]
Yes, clarification from the Minister's explanation.
Okay. Arau first. After that, Beluran.
Yang Berhormat.
Arau, is it an old matter? Another old matter.
This matter I asked the Honourable Member. I am speaking. I am only within seven minutes on rice. The Honourable Member will be the best Minister after the Minister of Rural Development in answering. The others answer in writing. We came here in large numbers to interact with the Honourable Member. The Honourable Member has given a good space. Alhamdulillah, Honourable Member.
Majukan soalan.
Even if the government falls, the Honourable Member will be taken back. Do not worry, yes.
[Dewan riuh]
Okay. Okay. Honourable Member, the question is simple. The cause of rice prices rising is that we floated imported rice. I have repeated this many times. If imported rice is not floated, the price will not rise. Number one. The Honourable Member just said the price fell from RM1,800 to RM1,400 because the Honourable Member issued a statement, so they are afraid of the Honourable Member. The Honourable Member's answer just now is dangerous, because farmers will ask the Honourable Member to compensate them RM400. So, is it true that because people are now afraid of the Honourable Member, we want the Honourable Member to set, before anything else, this second padi season, RM1,500 first as the floor price, and do not float imported rice. Local rice will follow the import price. If the import price is not floated, say RM30, the local price will follow, because the nature of this food is that it follows rice. If rice rises, it rises. But if rice does not rise, all food will fall. Thank you, Honourable Member.
Okay. May I answer together with Beluran?
Yes. This is a policy matter, Honourable Minister. When the ministry approves NAFAS's application to raise the price of imported white rice, but does not study the price of local rice, that is what causes an imbalanced policy. So, that is what causes local white rice to be manipulated into imported white rice. It is basic. So, when the ministry formulates a policy, it cannot be done piecemeal. Imports rise, local white rice does not rise. That is where the manipulation happens. So, this is a matter of policy
formulation. It cannot be done piecemeal, Mr Speaker. If I were sitting there, I would ask those officers, why piecemeal? Why imports?
Okey. Menteri.
Why does white rice not — it must be balanced. Before, we had no problem with imported white rice and local white rice, because their prices were roughly the same.
Tangga Batu.
Okey.
When imported white rice rises and local white rice does not rise, where's the problem?
Tangga Batu.
Never mind, answer this first. Then Tangga Batu.
Okay. Tangga Batu asks for just a little.
Too much already.
I think we have talked a lot about rice. Tangga Batu has already...
I have only 10 per cent of this paper left.
[Laughter] No, Tangga Batu is on fishermen. I once sent...
Never mind. Settle the rice problem. Then we move on to fishermen. Rice first.
Okay, okay. Thank you.
Silakan Menteri.
What questions the Honourable Member raised just now will be answered when I table the reforms to be made. Everyone must support it, except — and as for setting RM1,500, I am not a dictator. I have to discuss with all parties, especially with NACCOL and so on, because this government, we have a system. All the former Ministers here. Back when I was Minister of Territories, we asked for drains to be dug here. We come back, the Minister replies, we come back to discuss first with the engineer. So that is how it is. So, we have assistance. I want to change it from paddy to other things. What I want to mention here, among the major successes, is pineapple. Last year I urged that pineapple become our main export commodity in the future. At that time we exported 800 containers. Demand was 4,000 containers. Just now the Chairman of the Pineapple Board informed me that we are now able to export 1,700 containers. Demand 4,000 containers, 800 rose to 1,700. An increase of about 100 percent in roughly one year. This will further raise our pineapple exports and will become
a counterbalance to the agricultural imports that we bring in too much of, offset by pineapple exports rising so sharply.
Second, a success: onions. Now we are allocating more to spread onion seeds. Planting in Kelantan, in Perak, in Penang, in several other places. Then, in 2026, onions will become a crop in Malaysia and we are confident it is profitable, and many parties are now competing to plant onions. This is a new thing. Durian, which surprises me: durian cultivation passed down through generations was done by bumiputera, Malays. But when it comes to export overseas, those who become millionaires are mostly Chinese. Where did the bumiputera get left behind in the durian industry? This is what I look at seriously, so that bumiputera durian planting — if one says it is a land problem, we see that there is only one non-Malay Chief Minister, in Penang, all the rest are Malay, bumiputera. Why have we failed to provide land for durian planting, which has resulted in Kelantan itself having new durian millionaires, mostly Chinese? I am not speaking from a racial perspective. I want to see here why bumiputera have failed. When the crop is to be exported, planted on a large scale to make it an export commodity for us, we see bumiputera, Malays, failing in this. We remain with small-scale growers
Another one, Honourable Member.
...Who only produce durian for the market in Chow Kit Road and the markets in several villages.
Another crop, Honourable Member.
...Unable to become new durian millionaires in the management of this durian business.
Another one, Honourable Member.
Ya, Beluran.
Coconut, Honourable Member.
Terakhir ya.
Coconut. Honourable Member, another coconut which also needs attention from the ministry.
Setuju,
Baik, Menteri.
Kelapa juga...
The Minister has had enough. How many more minutes does the Minister need?
I still have a lot more. I promise that any matters in the speech which concern each constituency, we will answer in writing.
Minister, may I give way...
...Within five days the reply will reach all Members of Parliament. If it does not arrive, it means perhaps the Member of Parliament did not return to the office, went somewhere else. Except those who have many houses, like Arau. So we don't know which house he returns to? So we hope it reaches the office and so on.
Honourable Member, that is an unkind assumption on your part. I am right here, there is nowhere else for me to be.
Never mind, never mind. We understand one another, insya-Allah. So we hope that everyone who gives a view, everyone wants what is good, that is what matters most. Because the issue of food security has become a world topic now. We are talking about ensuring enough rice. A shortfall of 4.4 percent occurred last year because of the prolonged drought in Kelantan. Two prolonged droughts occurred. Then we wanted to pump water from Kemubu, but the pump did not arrive. The Prime Minister allocated RM20 million to buy pumps. The pumps did not arrive, so a new alignment had to be built for water pumped from the Kelantan River. All these matters of food security require cooperation. State governments must help together, especially in providing land so that we can expand paddy cultivation and livestock farming. We also ask that border controls be tightened. Because when goats are brought in from Thailand, crossing the narrow Golok River. The Golok River is narrow, to the point that for the disco in Kelantan, the Kelantan Police Chief has to deploy shift officers, there must be shifts. So many visitors go there. Goats, cattle and so on are brought in so easily, causing the livestock breeders in Kelantan to face problems, because the imported goats can be sold for RM280 or RM300 each. Whereas livestock breeders in Kelantan, at the very minimum, need to sell for a profit at RM500 each. Therefore, border control by all ministries must be strengthened to protect especially the breeders in Kelantan, in Perak, in Kedah, in Perlis, which border on these areas. Because we know that illegal imports bring disease and also threaten local breeders, especially in the border states. Thank you. Anything not answered this afternoon, I will answer in writing...
A little, Honourable Member.
...And all these answers will be given to all Members of Parliament.
Honourable Member, the Honourable Member's answer is the best, we acknowledge it, it is the best. But I want to tell the Honourable Member, we raised this matter two weeks ago, not today, about the floor price of rice. The officers have also written it down. So we ask the Honourable Member, we are not asking for you to become a dictator immediately, no. We have been asking for weeks, even months. If it is on TikTok, it has been months.
So I ask the Honourable Member to consider the floor price immediately. So that when we return home, everyone is happy. Although we will support the Honourable Member, even if the Honourable Member does not support us, we will still support the Honourable Member, but we are happy., that is what matters most. When we are happy, we pray. That is what matters, prayer is what matters. If we pray, other fashions are not good. We want to pray so that there is well-being. Thank you, Speaker. We want to pray that you do not treat us cruelly. Thank you, Honourable Member.
Thank you for the prayers and hopes.
Speaker, can you give five minutes for the Minister to reply...
No, the Minister did not ask.
...About NAFAS, Honourable Member.
The Minister did not ask. Has the Minister finished?
Habis dah.
Finished. Alright, thank you, Minister. Alright, before I invite the Minister of Science, Technology and Innovation, I will announce two matters. First, from today, once again I repeat, I will not permit any Member of Parliament to stand up to welcome the presence of guests. Not allowed, because colleagues have already made their speeches, and we stand up to welcome. From this year there will be 10,000 guests of ours. So imagine every time we stand up, we disturb. So if you want to announce, if you want to welcome the presence of guests, ask the colleague who is speaking to do so. Pass a note to him to kindly mention, "this is my guest from Beluran, please mention it", that is all. I do not permit anyone to stand up and just make a statement like that, because it disturbs. Alright, second, as I said earlier, the Ministers who come to wind up are to respond to the questions that have been raised. Other matters, if clarification is needed, yes, but do not bring new matters because the Minister will not, the Minister is not prepared with answers to what has been raised, not fair. Colleagues who asked questions are waiting for his answer. The Minister keeps circling around new things, and in the end the Minister gives no answers, and this will create a problem. Alright.
There is a ruling the Speaker made, I can't sleep now because I keep thinking about this matter, because the Honourable Member is my friend. The Deputy Speaker issued a ruling, from Lanang, issued a ruling that the word "jangan kurang ajar" from Jelutong to Kuantan, he said it is allowed. When I said "jangan kurang ajar", the Honourable Member said it is not allowed. The Honourable Member got angry again. I did not look at the Honourable Member's face, I was dreaming. Is the phrase "jangan kurang ajar" not allowed, or should the word "kurang ajar" not be mentioned at all? He said "jangan kurang ajar" is allowed. I said "jangan kurang ajar", not allowed. The Honourable Member made me sleep at the same time because I was looking at the Honourable Member's face
I could not bear it, because the Honourable Member is such a sweet person, and suddenly that day was not sweet at all.
Alright, I will check with my deputy what was meant. But, we all know, we are Asians. Let's be frank about it, don't play politics here. We are Asians, things that are not good, do not say them. Just as we do not want others to say such things to us. So, I will check with my deputy, insya-Allah, what was meant.
Because we have never disturbed the Honourable Member's side. We are on the side, a group that has been persecuted.
Yes, I understand.
The ones disturbing that side are many.
Betul.
And the Honourable Minister answers best, the Deputy Prime Minister and Minister of Agriculture. Other Ministers, please follow.
On record.
Yes, so that we can interact.
Baik.
Otherwise we will be left one by one, we will walk out because we are bored. Thank you.
Baik.
Tan Sri Speaker, I wish to express support for Tan Sri's ruling just now, so that no new matters are introduced. If possible, let us carry out a little reform on how time is given to the Minister to wind up for 45 minutes. We limit the time: after half an hour, only after 25 minutes can questions be asked. If not, I have been waiting since earlier, and the Minister has not mentioned my question at all...
Betul.
Yet what I said is the most important matter for me.
Betul.
For others, that is — so if we want reform, there must be a time limit. For example, 45 minutes, only after 20 minutes can the Honourable Member put forward questions. That is a proposal.
Thank you, Pengkalan Chepa, a sound idea. Insya-Allah, I will discuss it with my deputies. Alright, I invite the Minister of Science, Technology and Innovation. Please.
Thank you, Mr Speaker, peace and greetings, Malaysia MADANI greetings. Before I continue with this session,
allow me to express my thanks to the 14 Honourable Members who took part in the debate on the motion on the 2025 Budget, and who raised issues under the purview of the Ministry of Science, Technology and Innovation (MOSTI), namely Honourable Larut, Honourable Kubang Kerian, Honourable Gombak, Honourable Ipoh Timur, Honourable Indera Mahkota, Honourable Jelebu, Honourable Bangi, Honourable Kemaman, Honourable Kuala Terengganu, Honourable Gopeng, Honourable Sungai Petani, Honourable Batu Pahat, Honourable Sik and Honourable Kubang Pasu. Tan Sri Mr Speaker, the Malaysia MADANI budget for MOSTI for the year 2025 shows an increase compared with previous years, where the operating budget totals RM738 million, an increase of 4.7 percent. Meanwhile, the development budget increased to RM536.62 million. The increase in the 2025 development budget also involves an increase in all key components compared with last year, namely, first, STI Service Development from RM140 million to RM141 million. Second, STI Research, from RM102 million to RM172 million. To ensure that the country's R&D is able to produce technologies that are competitive, the government has decided to increase the R&D budget for 2025 from RM510 million in 2024 to RM595 million for next year under MOSTI and also the Ministry of Higher Education, KPT. In this regard, MOSTI will continue to focus on increasing the contribution of experimental development research from 45.5 percent in 2020 to 50 percent in 2025 by increasing the commercialisation of R&D outputs in the country. This is to continue the national agenda of becoming among the world's most advanced technology creators. Tan Sri Mr Speaker, I would like to touch on the questions and suggestions from the Honourable Indera Mahkota and also the Honourable Sik, regarding the allocation of R&D and commercialisation funds. I appreciate the concern of the Honourable Sik that allocations for national development research be increased to accelerate the transition towards a high-technology nation. It is true that the STI commercialisation budget of MOSTI has decreased for 2025 to RM222 million, compared with RM209 million this year. However, dependence on government funds alone for R&D over the long term is unsustainable, because the role of developing the nation played by the government should be shared by the private sector and industry. One of MOSTI's measures from the Twelfth Malaysia Plan (RMK-12) is to change the direction of R&D projects in MOSTI towards experimental development aimed at economic generation, which is a responsibility to produce technology products or services with high commercial value. To drive this success, a fund-matching mechanism with the involvement of the private sector, especially government-linked investment companies or
GLICs, as well as industry players, has been integrated through the Dana Malaysia Scient and Government, or MSE. MSE is a national alternative fund specifically for financing R&D and C&I activities, namely research and development and commercialisation and innovation, in a sustainable manner. In addition, MSE also functions as a platform responsible for obtaining funds from within and outside the country, including grants from industry, international funds, waqf, philanthropists, with permission, "engine.... [Unclear] ..", with permission, crowdfunding and SES fund. MSE has begun to make an impact on sustainable R&D and C&I financing over the long term through alternative sources, thereby reducing dependence on government funds while also boosting private sector participation. This step not only activates the private sector in R&D and C&I, but will also increase Gross Domestic Expenditure on R&D (GERD) and the business sector's contribution to R&D expenditure (BERD) of the nation to the targets set by 2030. MSE is currently matching funds with strategic partners comprising the private sector, industry, international organisations and governments of other countries in a 50:50 ratio to implement R&D and C&I projects in Malaysia, with the utilisation of returns generated from the MSE fund. MSE's existing result totals RM250 million. So far there are 6 companies in industries involving the E&E, green hydrogen, oil and gas, rail services and aerospace sectors that have expressed their intention to collaborate with MSE. Meanwhile, bilateral and multilateral collaborations involve 30 other countries. To make this incentive a success, the MADANI Government, for the year 2025, has allocated an additional RM170 million for MSE and always welcomes collaboration with all stakeholders, especially multinational companies conducting strategic studies or projects with high impact, to attract investors and industry players to invest in R&D activities. Next, I would also like to refer to the distribution of R&D and commercialisation funds as raised by the Honourable Indera Mahkota. For the information of the Honourable Member, for next year, out of the allocation of RM595 million, KPT is allocated RM400 million. Meanwhile MOSTI is allocated RM195 million, which is about 32.5 percent. Regarding the question on fund applications. MOSTI offers a funding financing scheme based on the Technology Readiness Level (TRL) criteria. TRL 2 to TRL 9. These TRLs cover the process of identifying the level of technology readiness for R&D, starting from the formulation of a proof of concept, with permission POC, until product validation
...available for commercialisation. MOSTI funding applications also allow financing for patent applications and the like. However, this is still subject to the provisions of the MyAPO Act. Applications for funding can be made on the MOSTI website, namely the R&D Fund. Under the MOSTI Funds Division, we have five funds: the Applied Innovation Fund, the Reaching Fund, Technology Development Fund 1 (TeD 1), Technology Development Fund 2 (TeD 2), and also the SRF (Strategic Research Fund). For startups, applications can be made under the My Startup Single Window, where funds for startup companies can be applied for on the MYStartup website. Applications will go through various stages of screening, and the evaluation committee consists of representatives from industry, private companies, veteran research experts, or academia. Among the challenges in commercialising R&D products is adapting a technology to industry demand. If not, a source has to be mobilised to meet market demand again, which is detrimental in terms of delaying the commercialisation period, allocation and manpower. Therefore, MOSTI is strengthening commercialisation efforts by reinforcing several internal initiatives, such as the first, the MySTI local R&D product procurement programme, which is a government procurement initiative in cooperation with the Ministry of Finance to enhance technology sovereignty and technology roll-out domestically. This programme targets 500 local R&D goods and services, marked with the MySTI logo, and 50 of them have succeeded in entering government procurement. This is a target. This is among the government's efforts to further strengthen the commercialisation of local R&D products. MySTI provides a platform that covers logo marking as well as an inventory of local R&D goods and services, which can be accessed at the portal mySTI.gov.my. Goods, services and the MySTI logo will be given priority in government procurement.
This programme is being implemented on a pilot basis for two years starting from 26 June 2023, involving 12 ministries. As of 30 October this year, a total of 445 applications for MySTI logo marking have been received, and 280 of them have been approved. Secondly, Tan Sri Mr Speaker, is the National Technology and Innovation Sandbox (NTIS), which is a platform that enables startup companies, researchers or innovation drivers to test technology products or services in a real environment, live environment, with permission, and in a safe condition, by providing relaxation from existing laws and regulations, either generally or specifically, for the purpose of developing technology and products through research.
Under NTIS, financing facilities are also provided for products or technologies resulting from local R&D or innovation, from the prototype stage to commercialisation. The target of this financing programme is to provide financial access to SME companies or startups to develop and carry out the testing or validation process of their technology products in a controlled environment, namely the sandbox. Since applications were opened on 15 July 2020 until October 2024, a total of 835 complete applications have been received for evaluation. Next, to date, 122 projects have been approved at the Sandbox Fund Approval Committee level for NTIS fund financing, with a total approval amount of RM116.1 million under the main funding partner, namely MTDC. Next, the third..
Just a little, just a little.
Ya, silakan.
Thank you, Honourable Member. I think that is a good initiative to help the commercialisation process. If I may, I would like to ask briefly about the timeframe, because previously one of the complaints was the time taken for approval. What is the timeframe? Has it been shortened somewhat or the like?
Thank you, Indera Mahkota, for raising this issue. So far, we do not have a fixed timeframe, but we will indeed prepare an SOP in which there is a fixed timeframe, where the answer, whether yes or no, will be communicated to the applicant within a specified period. Thank you. Next, third, the Malaysia Commercialisation Year (MCY), which is a programme to boost the results of research (R&D). Various parties have been implementing it since 2016. Up to this year, MCY has identified 553 local R&D products, technologies or services that have been commercialised and marketed, with sales revenue generated amounting to RM729 million. Various interventions and facilitation are also provided under MCY, including business matching, due diligence sessions, coaching sessions, business pitching, as well as local and overseas platforms to exhibit these R&D results. The MCY Summit is MOSTI's annual flagship event, aimed at recognising and celebrating the achievements of local researchers and technopreneurs who have successfully commercialised their R&D products in local and international markets. A total of 8,084 participants attended the MCY Summit 2024, involving 99 exhibitors, 28 local and international panel speakers, the presentation of 10 MCY 2023 awards, and eight MoU exchanges amounting to approximately RM62 million. Next, fourth, through the implementation of the KL20 Action Plan, which is a continuation of the Malaysia Startup Ecosystem Roadmap (SUPER) and the Malaysia Venture Capital Roadmap (MVCR), has been formulated and implemented by MOSTI. The comprehensive roadmap has outlined initiatives and incentives for startup founders and technology-based SMEs
technology-based, investors or venture capitalists and technology talent (tech talent) to a higher level. The implementation of the initiatives under the KL20 Action Plan will revitalise Malaysia's position as a leading hub for startups and venture capitalists, and elevate Kuala Lumpur into the list of the top 20 global startup hubs by 2030. There are 12 key initiatives outlined under the KL20 Action Plan that will strengthen the startup ecosystem and local talent, including technology-based SMEs, through policies and incentives that attract international investors and talent to Malaysia. Among them is the Innovation Belt, to create a physical innovation hub for startups, SMEs and venture capital to encourage collaboration, exchange of ideas and innovation. Besides that, the AI Infrastructure Enablement initiative provides world-class artificial intelligence (AI) infrastructure to startups to make Malaysia a regional leader in the field of AI. There is also the Venture Capital Golden Pass initiative, which enables foreign venture capital companies to receive a business licence within a short period to invest.
[Bangun]
Also under the KL20 initiative, MOSTI has developed the MYStartup Single Window portal as a one-stop platform that connects all stakeholders in the startup ecosystem in Malaysia. The development of this platform also involves cooperation with more than 17 ministries and agencies through the MYStartup Single Window task force, such as SME Corp and MDEC, which disseminate programme and financing information.
Ipoh Timur stands up, Honourable Minister.
Yang Berhormat.
Silakan.
Thank you, Honourable Member, my friend from Tanjong Malim. Regarding AI, we have suddenly entered the era of Sovereign AI. Now it is not only large language models, not only large imaging models, now there is also the large quantitative model, with permission, and we have entered the AQ era, where there is a cross between AI and quantum computing. Two or three weeks ago, we saw in Denmark that it was launched by the King of Denmark himself, Gefion, where Denmark itself has its own AI machinery, a supercomputer. An AI supercomputer for ― because now there is a term that says AI or Die. AI or Die is not only for humans, for individuals, for professionals, but for countries, especially in more specific and more special sectors, more specific to that country. In our present era, if we want to profit from what lies beneath the ground with the industry of the flood of investment from foreign countries in semiconductors and microchips, does the ministry and also the Federal Government intend or plan to establish, set up, or build a specific AI supercomputer
with semiconductor microchips, with rare-earth processing, with rare-earth mining and also silica processing, an AI LQI (large quantitative large model) LQM for Malaysia so that we are not left behind other countries. That is all, thank you.
Okay, thank you.
Thank you, Ipoh Timur. Thank you, Tan Sri Mr Speaker. I will get to AI shortly after this. So ― okay. I think that finishes this topic on startups, because there is another startup question asked by the Leader of the Opposition, but I did not give a written reply. Secondly, I will move on to the AI section. Before I do, perhaps I should answer Ipoh Timur's question first, although it is not entirely under MOSTI, but MOSTI together with several ministries such as the Ministry of Digital and our Ministry of Higher Education has cooperation to develop our AI capacity. As we know, AI is a very important enabler, but we have not yet been able to develop our capacity as a whole. Therefore, for next year, in this budget as well, the Prime Minister and concurrently Minister of Finance, the Honourable Tambun, has provided an extra RM50 million for several universities, and all those universities have their own responsibilities in the field of AI, but they have their own responsibilities. I will give an example, such as USM. USM has been given the responsibility to develop AI capacity in semiconductors and E&E. UPM has been given the responsibility to use quantum computing with AI to develop cybersecurity technology and others.
These are some initiatives that will be carried out by ─ although not under MOSTI, we are taking a whole-of-government approach, and that is why the answer is as such. Thank you, Ipoh Timor.
Honourable Member, just a little more. Just a little more.
Okey.
What I mean is, I welcome and very much appreciate what is being done, what the Honourable Minister just mentioned. But my question is more specifically about infrastructure, where we see in Denmark, they have built Gefion. He went to meet Jensen Huang and bought, if I am not mistaken, 50,000 stacks of GPUs from Nvidia, with permission. He bought a lot of GPUs, gathered them together, and built one supercomputer. So, there is the technology, there is their algorithm, there is their backend, software and hardware, where there is sovereign AI and sovereign AI infrastructure, with permission. So, is that matter in planning or has it ever been discussed, and if not, Ipoh Timor would like to propose that the matter be refined and considered so that we have our own AI infrastructure, as Denmark already has. That is all, thank you.
Thank you, Ipoh Timor. Indeed, that has not yet been discussed, but we will discuss whether we need a supercomputer or not for the time being. We will discuss it with the other ministries, and for the information of the Honourable Member for Ipoh Timor, we already have several initiatives. First is the development of talent to produce local professional talent in the field of AI. This talent development initiative is also driven together with other ministries and agencies, where the establishment of a Faculty of AI at Universiti Teknologi Malaysia (UTM) is an initiative to provide a source of AI expertise within our country. Secondly, we are also expanding the smart city initiative. Smart cities are one of the five strategic focus areas in the national artificial intelligence roadmap. MOSTI continues to support the development and financing of smart cities through the formation of collaboration with government agencies, local authorities and others. Thirdly is to provide a significant stimulus package in the AI sector. MOSTI is drafting additional incentives to attract domestic and foreign direct investment, including through tax incentives, development funds and collaborative facilities with research centres and international technology players. So, the report from the Malaysian Investment Development Authority (MIDA) cites the total AI investment in Malaysia up to mid-2024 as RM1.1 billion. On the 2nd of May this year, Microsoft announced an investment of RM9.4 billion over a period of four years. The report from A.T. Kearney shows the projected total AI investment in Malaysia to be RM492 billion by 2030. Fourthly is for us to hold a Request For Proposal (RFP), with permission. MOSTI has issued several request papers for RFP proposals in the field of AI, particularly for the education and government services sectors. This step aims to strengthen the local AI ecosystem and enhance the development of professional talent in high-technology fields. The first RFP focuses on developing an AI-based decision support system to improve the efficiency and effectiveness of public services. Through this project, local companies will have the opportunity to enhance their competitiveness by contributing to more responsive and efficient government services. The second RFP aims to develop an adaptive learning programme in the education sector that uses AI to support more personalised teaching approaches in line with the needs of each student. Tan Sri Mr Speaker, referring also to the concerns of the Honourable Gombak and the Honourable Bangi regarding the impact and implications of the use of AI and social media without a strong ethical guideline. Indeed, in this rapidly advancing digital era, the issue
such as civilian capitalism, behavioural surplus and behaviour modification put forward by Shoshana Zuboff demands serious attention from all parties. We need to learn from the experiences of other countries and take proactive action to protect the interests and sovereignty of our country. The government, through the relevant ministries, must urgently examine the provision of a regulatory framework that ensures fairness, freedom and the safety of users, especially students and young people who are easily influenced by uncontrolled digital content. To ensure effective regulatory compliance, the level of awareness of the principles of responsible AI must be instilled across all levels of society. This has prompted MOSTI to develop the Artificial Intelligence Governance and Ethics Guidelines (AIGE). The AIGE guidelines were launched by the Honourable Deputy Prime Minister on 20 September 2024. In general, these guidelines explain the application of the principles of responsible AI in three main categories, namely users, policymakers and technology providers. Apart from the AIGE guidelines, MOSTI, through its membership in the National Steering Committee, is also involved in the development of the National AI Standard. The AIGE guidelines and the AI Standard are soft approach methods, with permission, in educating society towards responsible and safe use of AI, encouraging innovation and technological development processes, and optimising the benefits of such technology for the nation and socio-economy. Tan Sri Mr Speaker, another issue that I want...
YB Menteri.
Yes, Honourable Bangi.
Yes, please, Honourable Bangi.
Honourable Minister, thank you for the explanation just now. During the debate, I raised the matter of the use, with permission, of AI-generated images and videos in official images or graphics of the government. For example, if there is a poster for a celebration and so on, previously that poster might have had pictures of people smiling and so on. Now, we see those pictures being replaced or produced using AI. So, previously we needed a photographer to take the pictures, then there was a graphic designer, with permission, to put it all together. But now, we just need someone to input what we want, and an image comes out, and this image is then made the official image of the government. So, there is no such thing as an artistic touch there. I am worried that if we constantly use this approach, meaning people who work as graphic designers and photographers and so on, we are not utilising their expertise.
So, I want to know, when we issue the guidelines mentioned by the Honourable Minister just now, I want to know whether the government has a policy or guidelines on the use of AI-generated images and videos for official images of the government. Thank you, Honourable Minister.
Thank you, Honourable Bangi. The answer is no. Because the AIGE is more about how to use AI ethically. So, whether it is an artistic touch or not, that is more subjective. So, it does not involve ethics, but I can answer the Honourable Bangi's question too, because this is indeed a question that is often asked by all levels of society, where AI is seen as seemingly going to replace all human activities or jobs. In fact, it is not. In fact, whenever a technology or enabler like this emerges, it will indeed raise such concerns. But if we look back at human history, we have never truly been replaced. Even before, when a revolution or the emergence of a new invention, machinery, occurred, everyone thought that after this everyone would lose their jobs. But the reality is not so.
It only involves changing or transforming skill sets, although some jobs may be replaced by the technology. But one job will not be the only thing that emerges; there will be many. New jobs will emerge that require new skill sets and competencies that cannot be replaced by today's technology. So, do not worry. What is important is that we must always upgrade ourselves through reskilling and upskilling programmes. Do not worry, because AI will not take over all of our workforce. To answer the question, Jelebu is not here, so can I skip it? Kubang Pasu is here? Kubang Pasu is also not here. Okay, if not, I will go straight to STI talent development. Mr Speaker, I was interested in the proposals and views of the Honourable Member for Sungai Petani and also the Honourable Member for Gopeng regarding comprehensive STI talent development. For the information of the Honourable Member, the Global Innovation Index (GII) 2024 Report shows that Malaysia has recorded a positive trend in the production of STEM talent in the country, with science and engineering graduates increasing to 40.23 per cent of total graduates in 2022. However, GII data findings also show a downward trend of 66.05 per cent in the number of researchers per million population in 2020. This analysis shows the challenge of retaining a potential research workforce, which has a direct impact on the country's innovation capacity. This significant disparity emphasises the need to form policies and dasar that focus on increasing the number of researchers and strengthening support for R&D activities for the benefit of the country's STEM graduates. Various efforts and initiatives that have been, are being and will be implemented by the government in increasing the statistics of researchers in the country towards
a high-tech developed nation by 2030. Among the initiatives implemented are as follows: (i) the R&D expenditure target, where gross domestic expenditure on R&D (GERD) is set at 3.5 per cent by 2030. The Budget 2025 has also allocated RM595 million compared with RM510 million in 2024 to MOSTI and KPT to drive R&D activities; (ii) encouraging active participation of the private sector in R&D activities through matching grants for high-impact R&D projects. R&D funding is also being strengthened through the establishment of the Malaysia Science Endowment (MSE) to increase R&D expenditure by the private sector, which is expected to contribute 70 per cent of total GERD value by 2030; (iii) positioning Malaysia as the world's third power in chips, as intended under the National Semiconductor Strategy (NSS), which covers attractive incentive packages to increase the inflow of strategic investment in high-technology semiconductors, particularly to encourage more front-end activities. This effort is indirectly expected to increase the demand and opportunities for high-skilled jobs among STEM graduates; (iv) developing and attracting interest in talent and human capital in science, technology and innovation by implementing various STI Culturisation Programmes, including the Outreach Programme at grassroots level, particularly targeting youth in the STEM fields; and (v) strengthening STI governance through the National Science, Technology and Innovation Policy and also the 10-10 Malaysia Science, Technology and Innovation Framework, which spans various ministries, agencies, institutions, research and industry. For the information of the Honourable Member, the ministry, through the National Science, Technology and Innovation Talent Development Committee, is also examining the actual needs for STI talent in collaboration with the Ministry of Education and the Ministry of Higher Education and various relevant ministries and agencies. STI talent is also an effort and initiative of the government in charting a strategy to ensure that future STI talent development needs are implemented in an inclusive and comprehensive manner. In addition to the question from the Honourable Member for Sungai Petani, as a step to focus on the involvement of young people in STEM, several Cultural Intervention Programmes, which are part of a main initiative known as the SciTech4U programme, have been implemented. In general, the programmes
of STI culturisation under SciTech4U involve several categories, namely flagship programmes such as National Science Week and Malaysia Techlympics. Next, other programmes carried out in an integrated manner with departments, agencies or other parties, such as the MOSTI STEM Camp, programmes at the National Science Centre including Xporia Sains, Kembara Sains Borneo, School's Out Kids In (SOKI), Special Science Day (SSD) and also programmes at the National Planetarium such as Mars Challenge, Space Insight, National Rocketry Championship, National Space Challenge and others. These programmes also involve informal and out-of-classroom learning activities designed to complement the curriculum that has been arranged by KPM. I am also very honoured to inform you that MOSTI has successfully gathered as many as one hundred committed scientists and matched them with one hundred schools under the STI 100³ Programme, as intended by the Honourable Prime Minister during the launch of the National Bioeconomy Showcase 2024 programme in July last year. Tan Sri Speaker, I now move on to the second-last issue, which is rare earth elements (REE). The Honourable Member for Larut, the Honourable Member for Kubang Kerian, the Honourable Member for Ipoh Timur and the Honourable Member for Kuala Terengganu have raised the issue of developing the rare earth industry. For the information of the Honourable Member, Malaysia is in preparation to establish the complete value chain from mine to microchip, with permission, through coordination at the Federal level and also the state governments, as this industry involves several key segments such as upstream, midstream and downstream activities. This value chain covers everything from exploration, mining, processing of rare earth minerals, manufacturing of raw materials and finally to the production of high-technology products such as super magnets, electric motors and microelectronic components such as microchips and so on. Several matters need to be assessed, such as mineral resources and exploration which involve powers under the state government. Processing infrastructure and technology, capacity building and R&D, workforce, and market relations and international trade. This also requires the involvement of the more dominant GLCs and cooperation with all parties to accelerate the development of this industry, as we are too dependent on foreign expertise along the value chain. For information, at this time, MOSTI through MIGHT is studying the potential for developing local technology and local talent to meet the needs of the REE industry in the future. A special workshop has been held with stakeholders to identify the availability of local technology and talent. If all these elements are implemented effectively, Malaysia is ready to become a major player in a high-value industry by utilising its mineral resources to produce REE-based end products. It must be emphasised that Malaysia needs to take into account the strengths of regional countries such as ASEAN and also participation in BRICS to ensure that Malaysia becomes
a leader in the REE industry at the international level, thereby providing comprehensive benefits to the people in terms of employment opportunities, national and state income. In addition, MOSTI has developed the National Advanced Materials Technology Roadmap 2021-2030, which outlines several important elements related to the rare earth element (REE) industry, namely: (i) development of separation and purification technology, focusing on the development of rare earth element separation and purification technology to increase efficiency and reduce environmental impact; (ii) research and development (R&D) collaboration, encouraging cooperation between university research institutions and industry to accelerate innovation and REE technology; ■1700 (iii) commercialisation of REE-based products, namely supporting the commercialisation of REE-based products such as super magnets, electronic components and materials for renewable energy technology. (iv) development of the supply chain. We need to develop a sustainable and competitive supply chain for the REE industry, including mining, processing and manufacturing of end products. (v) sustainability and environmental friendliness. Ensuring that all REE-related activities are carried out in compliance with the principles of sustainability and environmental friendliness to reduce negative impacts on the environment. This plan aims to make Malaysia a leader in advanced materials technology, including in the REE industry, by utilising local resources and enhancing global competitiveness. At present, the government provides assistance through the Strategic Research Fund (SRF) under MOSTI. There are 11 ABPs listed and MIKE is an ABP related to advanced materials, including rare earth elements. This fund aims to support the development of science, technology, innovation and economy (STIE).
[Bangun]
It covers research, new technology, processes, innovative products or value-added enhancements to existing technology.
YB, Ipoh Timur, please stand again.
Oh, okey.
Thank you, Tan Sri Speaker. I very much welcome, and am indeed eager to hear, the government's plan to adopt the mine to microchip approach, because that is the only way for us to attract,
mobilise the energy of the whole world and the capital of the whole world to make the national agenda a success. Nevertheless, I hear that there are plans to map the industry from upstream to downstream. What is needed? What exists and what has potential? But there is one mapping. Physical mapping, geospatial physical, magnetic telluric or magneto telluric, he calls it, it is called gold standard mapping, with permission. Is it the intention of MOSTI or other ministries, indeed of the entire Federal Government, if not all of Malaysia, to have some focal points or state focal points that will carry out eight to ten gold standard physical mappings, with permission, which will become the most valuable asset for us to mobilise and attract investment across, or at least in the upstream, that is the mine part of the mine to microchip? I ask for the Honourable Member's views.
Thank you, Honourable Member for Ipoh Timur. Mapping does not fall under MOSTI's purview, but I can pass it on to NRES. Thank you. Okay. Kuala Terengganu is not here. Okay, so, I will go straight to– although Kuala Terengganu is not here, this question was also asked by Batu Pahat, so I will go straight to the last issue, which is nuclear and hydrogen energy. Next, Honourable Tan Sri Mr Speaker, I would like to touch on the issue raised by the Honourable Member for Kuala Terengganu and Batu Pahat regarding the potential of nuclear energy technology. For the information of the Honourable Members, technological advances have made nuclear energy more suitable for Malaysia with new innovations such as the small modular reactor (SMR), or small modular reactors, which enable smaller, simpler and safer nuclear plants. Characteristics of new technology like this can be used in areas where conventional energy sources are not suitable in terms of application and cost. Current advances in nuclear energy technology have advantages in terms of safety, especially through advances in waste management. Modern reactors produce less radioactive waste by utilising fuel more efficiently. In terms of long-term operating costs, nuclear energy offers more stability, especially in terms of fuel prices. Unlike fossil fuels, which are subject to price fluctuations, nuclear energy has high energy efficiency, requiring very little fuel such as uranium yet able to produce a large amount of energy, making it far more efficient than fossil fuels. Please proceed.
Tan Sri Speaker, I would like to take just one minute because I am interested in this ministry. But in my debate, I do not have time and cannot touch on it. I understand that the Ministry of Science, Technology and Innovation is also very actively involved in increasing the number of students taking STEM, especially STEM package A and package B, Pure Science. Can the Honourable Minister explain what matters have been implemented by the ministry? I am interested in the Minister and also the ministry. They are indeed hardworking. Thank you. [Laughter]
[Laughter] Thank you, Kubang Pasu. Just now I have...
Already answered earlier, right? It's over already.
Already mentioned. Later I can give one copy to Kubang Pasu. Thank you for your concern.
Minister, how many more minutes do you need?
Satu minit?
I'll give you two minutes. Wrap it up.
Thank you. [Laughter] At this time, the government has...
Minister, want to interject, Minister.
Thank you, Tan Sri. Oh, okay.
I want to ask this: the country will receive data centres, will they be using these SMRs?
Thank you, Batu Pahat. At present, the government is considering the use of nuclear energy as one of the country's energy sources in the future. For now, not yet, but it is considering it for the future because the implementation of this initiative is part of the government's efforts to achieve the net zero carbon emissions target by 2050. MOSTI, as the ministry responsible for STI development, plays a role in providing expertise through training programmes. In addition, Nuclear Malaysia Agency has experience, knowledge and expertise in operating and maintaining the Triga Puspati research reactor for more than 40 years. It can be applied to the Nuclear Energy Programme if it is implemented in the future. Along with that, the government constantly conducts public awareness campaigns such as education programmes, expert visits, dialogues and public forums to raise public awareness about nuclear safety. Nuclear Malaysia Agency is collaborating with the Ministry of Communications through the Department of Information to implement the Nuclear Technology CEPA Programme across the country. In addition, Malaysia, through Nuclear Malaysia Agency as the liaison agency to the International Atomic Energy Agency (IAEA), can obtain technical assistance and support in the development of the Nuclear Energy Programme. Tan Sri Speaker, that concludes my response for this time, and...
[Laughter] I wanted to squeeze in a bit more. Can I?
Masa. Masa.
Yes, time is up, sorry. Once again, thank you to all the Honourable Members who took part in the debate on the Budget 2025 this time. The Ministry of Science, Technology and Innovation takes note of every proposal and issue raised by the Honourable Members and is always committed and endeavours to take appropriate proactive action. Thank you, Mr Speaker.
Alright. Thank you, Minister. Now I invite the Minister of Education.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace and greetings of Malaysia MADANI. Thank you, Mr Speaker. I take this opportunity, representing the Ministry of Education Malaysia, firstly to express my thanks to the Honourable Prime Minister for the largest budget allocation for the Ministry of Education compared with previous budgets. This shows that the government under the leadership of the Honourable Prime Minister places great importance on education and wants to ensure quality education for all our children. Tan Sri Speaker, let me begin by providing several important updates, particularly regarding, firstly, the MADANI book voucher. As of 8 November 2024, a total of 2.3 million upper secondary school leavers nationwide have redeemed MADANI book vouchers worth RM190 million, resulting in book purchases totalling RM149.1 million and involving 4.8 million copies of books. On this occasion, I would like to congratulate the three best District Education Offices (PPD) so far, which have achieved a 99 per cent redemption rate: PPD Keningau, Sabah; PPD Beaufort, Sabah; and PPD Sipitang, Sabah. So, congratulations to these three PPDs. For the three highest states, I extend congratulations to Terengganu, Sabah and Sarawak.
This programme not only improves literacy but also provides access to quality educational resources, reading interest and encouragement of lifelong learning among pupils in Malaysia. Honourable Members, ladies and gentlemen, I would also like to touch on another matter regarding the announcement of completed physical projects. In 2024, a total of 75 physical projects were handed over. Of this total, 30 projects involved the redevelopment of dilapidated school buildings, 31 projects were the construction of additional blocks and 14 projects were the construction of new schools. Apart from the physical projects handed over in 2024, there were also 45 completed covered open multipurpose hall projects and 36 classroom upgrading projects to design and technology workshops. Insya-Allah, from time to time, we will ensure that all our commitments are carried out as planned. Tan Sri Speaker, Honourable Members, as a living language, the vocabulary of the Malay language is always evolving in usage. Some words that were once commonly used are now considered classical. For example, previously 'tetuang udara' was used, but now it is 'radio'. If before it was 'lelereng', now it is 'basikal' (bicycle). Previously the word 'ujana', regarded as classical, is now widely used to refer to a garden. Ujana
Ilmu means a garden of knowledge, ujana buku means a garden filled with books. Whether we realise it or not, many words from the Nusantara or Malay world have already been absorbed into the Malay language. Not only regional words, but also dialect words, tribal language and so on, some have already been accepted as standard language. The process of absorption of one language into another occurs in all languages in this world. The word 'ketimbang' is a word found in the Kamus Besar Bahasa Indonesia meaning a word to mark comparison. The word 'ketimbang' has the same meaning as, or is synonymous with, the word 'daripada'. The word 'peluncuran', for example, has the same meaning as 'pelancaran'. The act of introducing products or programmes is increasingly used by users of the Malay language as a variation in appropriate contexts. So, I would like to call on Members of this House, Tan Sri Speaker, to continue enriching the Malay language and not be narrow-minded, and we must together uphold the Malay language... [Applause] And the recording of all these words of meaning has already been included, some of them already recorded in the dictionary published by Dewan Bahasa dan Pustaka (Institute of Language and Literature). Permit me today, Tan Sri Speaker, to share several trending words. The word 'sohor' here means trending, with permission, which has been displayed through the Pusat Rujukan Persuratan Melayu portal. (i) ketimbang; (ii) tatanan; (iii) intiha; (iv) mahsul; (v) purba sangka; (vi) taakul; (vii) kesenjangan; (viii) tiwikrama; (ix) walhasil; (x) maha kaya; (xi) kebhinekaan; and (xii) tatakelola. We cannot be like a frog under the coconut shell, letting our language not develop, and we should fully use the existing space to continue developing our language. So, in that aspect, we must not berpurba sangka, meaning to be prejudiced against this language, whereas its process of evolution and development must be expanded, and the enrichment of the Malay language must continue to take place well. Tan Sri Speaker, permit me to proceed by answering several questions raised by...
Mr Speaker, regarding
Ya.
Ya, silakan
I ask the Honourable Minister responsible for Dewan Bahasa dan Pustaka (Institute of Language and Literature). This may help, Mr Speaker. We direct questions in the House to Mr Speaker, but sometimes there is a woman carrying out the duties of Mr Speaker. In classical Malay, we do not have feminine or masculine forms. So, we say 'Tuan Puteri'. We do not call it 'Puan Puteri'. Perhaps the Honourable Member can help us so that― I suggest it remains 'Tuan Yang di-Pertua', even though the one sitting there is a woman, because in classical Malay, there is no feminine, no masculine.
Thank you for the consideration of the Honourable Member for Indera Mahkota. I agree, I will check with Dewan Bahasa dan Pustaka (Institute of Language and Literature) later, Tan Sri Speaker. Next...
Teruskan, teruskan.
I will begin with― Pagoh is not here. Batang Sadong is here? Batang Sadong is here. Good. The Honourable Member for Pagoh and the Honourable Member for Batang Sadong suggested that the government provide educational facilities, including the same digital learning between urban and rural areas. For the information of the Honourable Members, the Ministry of Education Malaysia (KPM) is always committed to efforts to improve access to quality education for all students regardless of location, economic status, gender or ethnicity. KPM has provided various TVET programmes for students who have completed Form Three and are inclined towards various skills at 990 KPM institutions throughout the country. Among the programmes offered are programmes at the Malaysia Vocational Certificate, Malaysia Skills Certificate, National Dual Training System level and professional certificates at colleges of the Ministry of Education Malaysia. Access to TVET education has also been expanded in technical secondary schools through the Technical elective subject and national secondary schools through upper secondary vocational programmes, upper secondary industrial apprenticeships, Vocational subjects and Professional elective subjects. For students with special educational needs, KPM provides access to TVET education through the Integrated Special Education Programme in SMK and vocational programmes in special education vocational secondary schools. In addition, the admission of students to fully residential schools (SBP) prioritises 60 per cent of students from B40 families. KPM cooperates with Yayasan Sabah and Yayasan Sarawak to provide opportunities for children born in the states of Sabah and Sarawak to continue secondary education at SBP. This effort is to strengthen national integration in forming one Malaysian nation based on the Federal Constitution and the Rukun Negara.
In terms of the quality of teaching and learning, KPM continues to strive to strengthen the competency of pre-service and in-service teachers through empowering professionalism and sustaining the well-being of teachers across locations throughout Malaysia. Teacher professionalism in service is empowered through continuous professional development so that they remain competent and motivated in carrying out their duties. As of 31 October 2024, a total of 218,359 trainings have been conducted by KPM with more than 433,163 participants. In addition, the implementation initiative of the Program Transformasi Daerah (District Transformation Programme) is also involved to ensure that the education gaps between urban and rural groups, socioeconomic status and gender can be narrowed. As a result, the average SPM grade achievement for 2023 for both categories of urban and rural candidates has shown an improvement. The achievement gap of candidates between urban and rural areas remains at 0.43 points, as in the SPM examination of 2022. In terms of providing quality education resources, KPM provides PdP content and support materials for use by teachers and students, including students with special educational needs, provided through the DELIMa learning platform, digital hub studio equipment, smart repository systems, and TV and radio programmes that can be accessed at any time and anywhere. Consequently, KPM always strives to equip all schools with high-speed internet access, digital devices and other IT facilities in stages. Recently, KPM has upgraded internet access through new procurement of internet services for the period July 2024 to June 2025. This upgrade includes the addition of speed capacity. Meanwhile, for schools using broadband technology, the access capacity― and this also refers to the commercial coverage of the internet service providers involved. All these efforts are being carried out, Honourable Member, to ensure that our children do not fall behind in getting coverage, especially for their learning. In efforts to provide infrastructure facilities, KPM always gives priority to providing conducive and comfortable educational facilities for all students and education personnel throughout the country. Therefore, the agenda relating to the upgrading of schools with dilapidated buildings has become one of the seven main pillars of the Ministry of Education Malaysia. Taking into account these needs, in Budget 2025, KPM has been approved an allocation of RM1 billion for upgrading dilapidated infrastructure in 543 schools, including in Sabah and Sarawak. KPM has also been allocated RM1 billion to carry out maintenance works in all types of schools and non-school institutions, including other educational institutions. Accordingly, to ensure that access to quality education reaches all students and education personnel regardless of location, economic status, gender or ethnicity, this year the Malaysia Madani Education Team of KPM has implemented
three Parliamentary follow-up programmes to educational institutions under KPM that have been identified, to visit and understand first hand, with permission, the issues we face and, subsequently, to propose solutions to the relevant parties.
For next year, Honourable Members, we will begin the Parliamentary Follow-up Programme to Kalabakan, God willing. Kalabakan will be the first Parliament for 2025. Is the Honourable Member for Hulu Selangor here? Hulu Selangor, Kota Belud? Hulu Selangor, Kota Belud, Sungai Petani, Shah Alam raised issues about the National Assessment System and the reinstatement of UPSR and PT3. KPM informs that, following the abolition of the Ujian Pencapaian Sekolah Rendah (Primary School Achievement Test) starting from 2021 and the Pentaksiran Tingkatan Tiga (Form Three Assessment) starting from 2022, KPM focuses on strengthening the School-Based Assessment (PBS), involving the components of classroom assessment, assessment of physical activities, sports and co-curriculum, and psychometric assessment. PBS is described as an assessment oriented towards the holistic development of students, where the learning focus is not only on grades or marks in examinations but shifts to meaningful learning in an enjoyable environment. For the information of the Honourable Member, to improve the education assessment system, KPM has made comparisons with several countries such as Finland, the United States, Germany, Canada, Australia, Scotland, Norway, New Zealand, Japan, Hong Kong and Indonesia, and they have also shifted from centralised examinations to assessment. The comparison of education assessment implemented in regional and international countries shows that education assessment in Malaysia is moving in line with the global education agenda. The implementation of PBS is also in line with the Incheon Declaration and The Education 2030, Framework for action, with permission, which was presented on 21 May 2015 at the World Education Forum, with permission, in Incheon, Republic of Korea. This declaration outlines quality education assessment through continuous classroom-based assessment and more comprehensive assessment covering cognitive and non-cognitive assessment. As an effort to strengthen PBS, KPM has also implemented the end-of-academic-session test, which is a summative assessment within the assessment component. This test is of a low stake nature, with permission, and is able to reduce examination pressure on students. In addition, KPM has also made improvements to the implementation of the end-of-academic-session test through the academic sessions of 2024 and 2025. Among them is changing the form of reporting from mastery levels to percentages and grades, and giving schools and teachers autonomy in the implementation of the end-of-academic-session test. This change is to provide improvement besides being more parent-friendly. For parents who
want to understand the overall way their child is assessed, not only through mastery levels but also through percentages and grades. For the information of the Honourable Member, details relating to PBS as an assessment oriented towards student learning and development have also been presented to the Cabinet. KPM is confident that holistic and continuous assessment through PBS, which covers intellectual, emotional, social and physical aspects, is the best approach to optimise students' potential comprehensively and in an integrated manner, as envisaged in the National Education Philosophy. The Honourable Member for Hulu Selangor also raised the need to hold engagement sessions and discussions before implementing School-Based Assessment. For the information of the Honourable Member, KPM has held various engagement sessions at various levels to provide understanding of the implementation of this PBS. In the resolutions that have already been given, these sessions aim to clarify the concept of holistic PBS, identify challenges and produce resolutions for improvement including the enhancement of assessment training, technological capacity, school autonomy in assessment and the full-time placement of guidance counsellors. In the Convention Resolution, 12 main proposals were produced. Among them are retaining and improving the end-of-academic-session test, increasing parents' understanding of PBS and recognising student involvement in activities outside the classroom, and this convention also supports the retention of the End-of-Academic-Session Test and considers the UPSR and PT3 examinations no longer relevant. The Honourable Member for Hulu Selangor also touched on about...
The Honourable Minister.
...The heavy syllabus.
The Honourable Minister, Kota Belud.
Ya. Silakan.
The reason I ask this question. This is what I received from most of the teachers I met in Kota Belud.
[Bangun]
I think even within, from the PPD itself, many want to bring back the UPSR and also this PMR examination, especially in rural areas. What about when teachers themselves do the assessment, teachers themselves give the marks, sometimes, how should I put it, ya? What I mean is, sometimes we want to restore the sense of enthusiasm of the students to want to study, bah, one.
Secondly, also, how do we assess with one same standard, equal for all students throughout Malaysia, when we ourselves, we give the same marks to students, we are the teachers, we are the ones who assess and so on.
[Bangun]
So, in my view, I still hold to what has been voiced by the teachers in my area and also, if I may say so, from the PPD office itself. Some of them have voiced this, and there are also some among the parents who have voiced to bring back the UPSR and also this PMR examination for students, to restore their kind of spirit to want to study and spirit to want to score, bah. Just like that, more or less. Thank you.
The Honourable Minister, a little.
Boleh Menteri?
May I have a little? Sungai Petani. Honourable Minister, I too, in the debate, proposed that we bring back the PT3 or UPSR examinations, because one of the things with this classroom assessment is that teachers want to ensure that their school remains ranked first. That means their students are all clever. But they pass that matter or problem on to secondary schools or other schools when these children move up to secondary school. This is a problem that happens. When I was in the constituency, many, even principals themselves, said that there are students in Form 4 who still cannot count, cannot read, and many students in Form 4 are not interested in entering the science field or science stream because they feel they cannot cope with learning as there is no motivation from themselves.
[Bangun]
This is what is happening below. Thank you.
The Honourable Minister. Kota Belud again? Just a moment, yes. This is what I meant earlier, that sometimes we, in our own schools, want to raise our performance. After that, we give marks. We also assess. That is what I– If it were me, I definitely agree to bring back the UPSR and PMR examinations once again. Thank you.
The Honourable Minister.
Good. Does the Minister want to take Kangar first? Want to answer first?
Kangar, Kangar.
I have been standing for a long time already.
I give the floor to Hulu Selangor.
Bagilah.
Silakan.
Okay, Hulu Selangor.
Okay, thank you Tan Sri Yang di-Pertua and thank you to the Honourable Minister for the explanation that has been given. However, as our colleagues have informed earlier, it is the same as what has been informed. However, one thing I also need to know from the Honourable Minister is that if we take from abroad, in one class, what is the total number of students in that class? Because I understand from the professors I met, whose children also study there, it is only 20 people, maximum. So, I want to illustrate that in Malaysia, one class is 40 people, 10 classes make 400 people whom they have to assess. So, it is not an easy matter. I see, as the secondary school teachers have stated, when these students enter Form 1 schools, they get good results, they can read, but eventually when placed, the students cannot read. This is a comment from the teachers themselves. I earnestly request the ministry to take note of this matter and please discuss it again for the good of our children. Thank you.
Kangar.
Kangar, the Honourable Minister.
Silakan Kangar.
Okay. Thank you Mr Speaker. So, for the issue of School-Based Assessment, it has many pros and cons. I am the opposite. I think I support School-Based Assessment. However, it has weaknesses. Only School-Based Assessment needs to be improved, because with School-Based Assessment, teachers have to lie a lot. The front class is okay, the back class, teachers have to do it. Teachers have to do it. If it is school-based, students who do not do it, teachers must help do it according to instructions. Teachers must help write. Teachers must take books or ask... [Inaudible] friends, right...
What is the question, Kangar?
Ya?
What is the question, Kangar?
The question is, at one time I supported.
Ya.
Some support, some I asked to be corrected so that there is room for students at the back of the class, we must– we must give fairness. Because students at the back, we just give them and give marks, for example, B when their qualification is C or D. But we give them high marks and it is quite different from the actual situation. Thank you.
Baik.
Thank you Tan Sri Speaker. I take this opportunity to stress several matters. Firstly, at this time the Ministry of Education
Malaysia will not backtrack on its decision. Whether to abolish or retain UPSR and PT3 is no longer relevant. But we give full space for this assessment to take place and to be strengthened far better. That is why I want to draw the attention of all Honourable Members back to the purpose and philosophy of education. This is what Indera Mahkota often reminds me: whatever happens in education must be returned to the National Education Philosophy. When we look at the National Education Philosophy, the gradual development of these children must be seen in the context that they are assessed fairly within a more holistic context. That is the first point. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Sitting] Secondly, abolishing UPSR and PT3 does not mean there are no examinations at all, Honourable Member. They still exist. That is why in my earlier reply I stressed that we will strengthen UASA, this final test, as part of the assessment context for parents who still feel their children need to be evaluated through examinations. It is low stakes. We want to move, to go through a process shifting from an examination-oriented process to assessment, and this indeed requires time as well as explanation and clarification. I agree. That is why when Hulu Selangor raised the need for this engagement session, I agreed. No problem. So, regarding Kota Belud and Sungai Petani, the concerns that were raised have actually already been addressed. We have met these groups and discussed matters with them, and it did not stop there.
[Bangun]
This is because today's process is to train teachers to conduct assessments in order to avoid what Kangar mentioned just now. Lying, what was it just now, cheating and so on. It is a matter of integrity. That is why this also trains teachers to carry out assessment tasks with integrity. So, for now, Honourable Member, I take note of all the concerns, the worries and the apprehensions, by ensuring that this explanation process will be carried out better. We will go down from time to time, particularly to the PPD Kota Belud, and perhaps Sungai Petani, which still need explanations, and to see for ourselves how the context of this assessment can bring many benefits to our children.
Honourable Minister, just a little. Just a little, can? I commend the Honourable Minister for elevating the philosophy of education itself. But will the Honourable Minister, together with the ministry,
present a result or a study of the success of this assessment system compared with the previous examinations? Because apart from elevating that educational philosophy, what we must guarantee is the quality of education. Thank you, Honourable Minister.
On the matter of education quality, we do not compromise. That is why I, my colleagues, and the leadership at the Ministry of Education Malaysia (KPM) want to maintain this assessment, and it must be given time and a period until we really can achieve our aspiration. Our aspiration is very great: to ensure that the holistic development of our children is supported by a strong ecosystem in particular, and that teachers are given autonomy to conduct assessment, because teachers are the people who know these children most closely, and continuous training is provided to teachers. Because Indera Mahkota asked a question just now. I, too, see that Speaker has forgotten to say Madam Speaker or Mr Speaker. [Laughter] The Honourable Member for Hulu Selangor touched on the heavy syllabus. For the Honourable Member's information, KPM always strives to improve the curriculum to ensure that the curriculum formulated is relevant to students' needs. To that end, KPM has conducted curriculum monitoring, needs studies and various engagement sessions to identify issues and obtain input and views on the current and future curriculum. KPM has implemented this, Honourable Member, curriculum intervention, of which one of the strategies introduced is the provision of curriculum alignment documents. So, when the Honourable Member asked about the curriculum said to be heavy, we have implemented interventions through the Standard Curriculum for Primary Schools Alignment Edition 3 for the subjects of Bahasa Melayu, English, Science and Mathematics, Levels 1 and 2. This curriculum alignment involves the updating and restructuring of the content of those subjects. So, there is no problem, Honourable Member, because whatever problems and issues raised on the curriculum always receive attention.
[Bangun]
We can carry out interventions at any time with the capacity, efficiency and expertise that we have, to ensure that none of our children are marginalised and, certainly, that this also has an impact on their learning.
Honourable Minister.
In addition, the Malay Language Guidance Module (MOBIM), English, Science and Mathematics Modules for Levels 1 and 2 are also provided to help teachers plan appropriate methods of delivering curriculum content in the classroom. This is good. The DPK, the Curriculum Alignment Document, as well as this MOBIM, guidance module
has been widely disseminated to all schools and can be accessed by all parties, including parents, through a link on the KPM website. At present, KPM is carrying out a review of the curriculum after the completion of the full curriculum cycle. This curriculum review is carried out by taking into account all input and views from various stakeholders. KPM is preparing students by providing a new curriculum shaped on a standards-based curriculum and oriented towards competency.
Honourable Minister.
Is Balik Pulau here? Balik Pulau.
Temerloh.
Menteri.
Wait, I will check Balik Pulau. Balik Pulau is not here.
Honourable Minister.
Silakan.
Thank you, Speaker, and thank you, Minister. Temerloh also raised matters relating to the curriculum. Temerloh proposed that KPM examine issues relating to language. Temerloh proposed that mother-tongue languages, especially Tamil and Mandarin, be taught in National Schools. Also, we propose that not only should they master their mother tongue –
Deputy Speaker, that question has indeed already been asked in this question. So, it is not. That means I will answer.
Okay, thank you.
So, I will proceed with Gopeng, is he here?
Tidak ada.
Gopeng is also not here. Kubang Pasu? Kubang Pasu, good. The Honourable Member for Kubang Pasu asked about the outstanding performance of students who take STEM subjects in the SPM examination. For the Honourable Member's information, the analysis report on the SPM 2023 examination results is based on new candidates who registered for at least six subjects. Based on the analysis of candidates who obtained excellent results of A plus, A and A minus in the four STEM elective A subjects in the SPM 2023 examination, the figures are as follows. Physics 26.9 per cent, Chemistry 22.6 per cent, Biology 26.3 per cent, Additional Mathematics 17.2 per cent. Achievement in STEM subjects at the SPM level is an important success, Honourable Member, through whole-of-government and whole-of-nation cooperation, with permission. We are always committed to collaborating with all parties involved in the STEM ecosystem to foster interest and encourage school students to choose STEM fields, including pure science subjects. This initiative
ensures that the country has sufficiently qualified STEM talent to meet the needs of the professional STEM workforce. So far, Honourable Member, we are working hard to ensure that our children who are educated in STEM receive ecosystem support, backing and a direction that truly shapes them as a whole, closely linked not only to elevating STEM but also to contributing to the country. Please, Honourable Member.
Thank you, Mr Speaker, and also the Minister. I stand here, I ask for this opportunity not to criticise but to share views, yes. Actually, the initiatives taken by KPM are very good so far. However, I would like to provide some information regarding STEM.
We, secondary schools for SPM, STPM and Matriculation, are supplying a very important input to universities so that they can make — I am especially referring to the level of Engineering degrees. So, I see that there are statistics showing that in 2023, for example, STEM was 45.7, Honourable Minister. In fact, those who really take Pure Science Package A and Package B are only 20 per cent. Out of a total of 375,000 people, only 74,882. Their — our concern now is not for any other reason, because we are now moving forward so rapidly, bringing in many investments, especially in electrical, electronic, semiconductors. What we know is the national semiconductor strategy announced by the Right Honourable Prime Minister, that we need 60,000 engineers within five to ten years. But based on the data we have, we will not reach that level in the next five to ten years. So, we need to step up our efforts to ensure these children, these school children taking SPM, STPM, Matriculation, are more numerous in taking Pure Science. I have one school as an example in Kedah.
Summarise, Honourable Member, the Minister's time is up.
Just a moment, just a moment. Today is still sweet today. The student body has 80 people, 40 are taking Pure Science, another 40 are taking STEM in C. Out of those 40 Pure Science students, 20 per cent obtained it. So, if we make a projection for five, ten years from now, we will only get about 40,000 engineers, which is what we need. So, if we do not step up efforts — I know the ministry and the Minister are indeed stepping up efforts. Perhaps we should look for new methods, other methods, to ensure more of these students take Pure Science and more of them pass with excellent results so that they can enter engineering at university level. Thank you.
Thank you. I take that view, Deputy Speaker. Next, the Honourable Member for Wangsa Maju? Wangsa Maju is not here.
Ada, ada.
Ada, ada.
Where? Eh, here. [Laughter] The Honourable Member for Wangsa Maju proposed that students be given the opportunity to explore skills fields from the early stages of schooling. KPM is committed to providing access to TVET education beginning with TVET exposure for primary school pupils, so that they can make appropriate choices of TVET streams when entering the secondary level, that is, after Form 3. Basic early exposure to TVET education has been introduced to all pupils as early as Year 4 at primary school level, through the subject Design and Technology (RBT) beginning in 2014. Pupils are introduced to TVET-based skills that offer main fields in technology, home science, engineering, programming and agriculture. To ensure the continuity of TVET education, from 2017 the RBT subject was continued for lower secondary pupils in Form 1. This effort is to ensure pupils are given early options in the main TVET fields before entering the TVET stream after Form 3. For the Honourable Member's information, through the 2027 school curriculum, KPM will place emphasis on the basics of TVET education to nurture pupils' interest in TVET fields. KPM will introduce TVET elements starting from Level 1, namely Year 1 and Year 2, up to Level 2, namely Year 3 and Year 4 in primary schools, through integrated learning that combines various disciplines in the fields of science, technology, digital, visual arts, music and health education. Next, pupils in Level 3, Year 5 and Year 6, will learn the basic disciplinary knowledge of TVET such as technology, home science, engineering, programming and agriculture. Learning is implemented on a project basis that enables pupils to know, understand and explore the application of technology and digital in various fields. The skills and values content from various technology and digital fields will be developed for pupils at lower secondary level, namely Forms 1, 2, 3, so that they can recognise their potential, thereby encouraging their interest in TVET fields. KPM also provides access to TVET education for pupils with special education needs through the Special Education Integration Programme (PPKI), beginning in Form 1 in a macroprudential manner in national secondary schools. Pupils with special education needs who follow PPKI may continue TVET education to obtain the Malaysian Skills Certificate Level 3, which is being implemented in phases beginning in 2024. At KV Bachok Kelantan, besides that, MBPK may also follow vocational programmes at four special education vocational secondary schools for post-Form 3 leavers, namely Sekolah Menengah Pendidikan Khas Vokasional Indahpura Kulai, Johor; Shah Alam, Kuantan; Merbok; and also Sekolah Menengah Kebangsaan Pendidikan Khas Persekutuan Pulau Pinang. So, Honourable Member, KPM is confident that through the initiatives implemented, it can provide early exposure and give pupils the opportunity to choose TVET fields after completing
lower secondary education, and especially in preparation for the new 2027 curriculum, we will start earlier. Is the Honourable Member for Kluang here?
Tak ada.
Kapar, Kapar. Minister, Kapar brings that overcrowded school, that is very important. Congratulations, a lot of — you got the largest allocation, I hope it will be resolved.
Thank you. Thank you, Kapar. God willing...
Menteri, Menteri.
That is also part of our commitment, particularly closely linked to overcrowded schools. Yes?
Minister, Minister, Kota Melaka. Just a little, Minister, considering the shortage of time. Earlier in the Minister's reply, it was mentioned about welfare provided to pupils, namely book vouchers. So, there is another welfare provided to pupils, the Early School Assistance. So, that will be given to students from Standard 1 to Standard 6, and from Form 1 to Form 5.
Betul.
Likewise, students who go to Matriculation also receive the Cost of Living Aid. That is welfare effort provided to pupils. But what I want to raise is Form 6 students, who at the moment do not receive any aid at all. So, can the Minister consider giving the Early School Assistance to Form 6 students as well, to empower Form 6. Thank you, Minister.
Hulu...
Kota Melaka...
Honourable Minister, a little, can?
Deputy Speaker, let me also clarify. I take the view of Kota Melaka very seriously.
Sikit saja.
Actually, during the engagement period, particularly regarding matters involving welfare in particular, we indeed want to ensure that none of our children are marginalised, including Form 6 children, Honourable Member. So at this time, although it may seem that in this budget there is assistance for others, Form 6 children have never been excluded from receiving any assistance provided by the Ministry of Education Malaysia. However, Honourable Member, we will continue our commitment and look at especially the Early School Assistance as well,
which should rightly and appropriately also be given to Form 6 children. Likewise with the expansion of scholarships, to which we will give full commitment for Form 6 children. Likewise with the establishment of the Premium Form 6 College, which I am sure will also involve several important approaches that we must ensure so that Form 6 continues to be the choice for our children.
YB Minister, can ask a little? No time...
Hulu Selangor has had plenty already.
Sikit saja.
Menteri.
I will proceed with Sungai Siput, is he here?
Can the Minister squeeze in a little about Form 6?
Okey, sila.
Yes. Regarding the Form 6 issue, we know that now fewer people are taking the science stream, because everyone knows that if you take Matriculation it is easier to enter university. What is the actual problem? STPM is harder to get into university than Matriculation. One of the reasons is the co-curricular marks. Co-curricular marks in Matriculation are easy to get 10 marks, full marks. But for STPM, students find it hard to get them. Even though they apply to university, when it reaches the co-curricular marks stage, they will lose to Matriculation students. I hope KPM can explain this real problem.
A little only, YB Minister.
Indeed, Honourable Member. We are looking at those matters, and we have also conducted a study, Honourable Member, to look at the whole of post-SPM education, Matriculation, Form 6 and other available opportunities. What the Honourable Member has mentioned is among the matters also raised, particularly regarding co-curricular marks and so on. But I take full note, and actually it is indeed within, with permission, the policy line of the Ministry of Education Malaysia.
Sungai Siput is absent. Merbok and Temerloh raised the need to provide modern technological resources such as AI in teaching and learning (PdP). For the information of the Honourable Members, the Ministry of Education Malaysia (KPM) has provided 16 AI-related applications on the DELIMa platform. Of these, nine AI applications such as Gemini, ChatGPT, beingAI and Conker AI play a role in helping teachers plan lessons, build questions, prepare quizzes and create educational resources to attract students' interest in learning. Through the Gemini AI Academy, teachers can improve their AI skills to create creative and engaging AI-based teaching materials. Overall, Honourable Member,
that at the level of the Ministry of Education Malaysia, the integration of AI in DELIMa enables students' learning experiences to be tailored to individual needs. DELIMa, or the DELIMa platform, supports students' learning at the pace and style each of them needs. For the information of the Honourable Member for Temerloh, through providing access to digital educational resources, the DELIMa platform provided by KPM can encourage the use of technology in the PdP process. To date, DELIMa has hosted 789 basic digital textbooks, 12,762 learning videos and 170 educational radio podcasts that can be accessed free of charge by all students and teachers. In addition, 23,882 materials have also been shared by 3,715 teachers, apart from the Digital Learning Gateway (Gerbang Pembelajaran Digital) developed by 16 state education departments. All these educational resources enable more efficient and more engaging PdP implementation for digital-generation students. For the information of the Honourable Members, the use of these digital platforms has been very well received by teachers, with usage of more than access to these digital platforms, more than 95 per cent. We still need the support and encouragement of parents to encourage their children to use the DELIMa platform for their learning. Kangar and Batu Gajah. Is Kangar here? Batu Gajah? Here. Batu Gajah raised the issue of learning loss among urban and rural school students. For the information of the Honourable Member, in tackling this issue of learning loss, KPM has implemented various initiatives to ensure students master the basic 3M skills, such as special remedial programmes, the Primary School Literacy and Numeracy Programme (PLaN) and the Screening of Literacy and Numeracy for Year 1 Students. For the information of the Honourable Member, all these programmes have been implemented, including through cooperation between the Ministry of Education and also the Ministry of Finance, which has implemented the Anak Kita Programme led by the Pantau Madani Unit and Yayasan Hasanah, and this makes the programme a curriculum intervention initiative in addition to those already implemented by the Ministry of Education Malaysia. We also recently implemented a learning loss screening programme for Year One students, Honourable Member, and from the results of that screening, we found that at the early stage there were as many as 122,000 of our children who had not mastered the 3M. By November, with respect, at the end of this November we will know the results of their remediation, which will certainly have an impact on the overall data and on the learning loss initiatives we have already implemented. This programme will continue to be implemented from time to time. Likewise with the special schools we have already implemented, and also the guidelines for managing students at risk of dropping out, to help schools identify and manage students at risk of dropping out effectively and systematically. Deputy Speaker, my time is up.
The Honourable Minister.
Madam Speaker, during my debate I raised three matters. I seek a reply. If not, in writing. Because I asked about the breakdown of allocations for SJKC and SJKT.
Honourable Members, I can see the Honourable Minister's reply is this thick. I think all the answers have been prepared.
[Bangun]
Those that have not yet been answered, the Honourable Minister may give a written reply later.
Yes, including the position of SJKC schools, yes.
Thank you. Yes, that's right. Thank you, Honourable Member.
And donations and building. That's two. Three.
Honourable Minister, just one thing, Honourable Minister. Just for attention, namely for student Syamil Faris who was electrocuted. So, I ask that the ministry also pay attention to look after this student. He is traumatised, you know. Thank you.
Good. Thank you, Honourable Member. In conclusion, Deputy Speaker, Honourable Members, we record our thanks to all Honourable Members who have raised 195 matters and the 80 Honourable Members who have raised and debated issues relating to the Ministry of Education Malaysia. We will meet again in other debates, insya-Allah. But allow me to record my immense thanks for these very constructive views, which are very helpful, especially for the ministry to see the overall picture of what actions and commitments to take next. On behalf of the Ministry of Education Malaysia, we record our thanks and Assalamualaikum warahmatullahi wabarakatuh.
Thank you, Honourable Minister of Education. Now I invite the Honourable Minister of National Unity to reply.
Thank you, Madam Speaker. Greetings of peace and greetings of Malaysia Madani unity. First of all, I wish to record my thousand thanks to the Honourable Members for Sri Aman, Kapar, Batang Lupar, Batu Pahat, Bukit Bendera and Langkawi, who took part in the debate on Budget 2025 and touched on matters under the Ministry of National Unity (Kementerian Perpaduan Negara).
Madam Speaker, the Ministry of National Unity (Kementerian Perpaduan Negara) welcomes Budget 2025, which was tabled by the Right Honourable Prime Minister on 18 October 2024. It truly reflects the government's firm commitment to safeguarding the well-being of the people by emphasising harmony, prosperity and unity. This Budget also aims to strengthen the social and economic foundations of the nation by focusing on a fairer distribution of resources, especially for those in need, thereby ensuring that no one is left behind in the nation's development. On behalf of the Ministry of National Unity, I thank the Right Honourable Prime Minister for approving an operating allocation totalling RM587.35 million, a development allocation totalling RM123.99 million, and a total 2025 allocation of RM711.34 million. The ministry will ensure that all approved allocations are managed efficiently and responsibly to achieve the aspirations of stakeholders in line with the aspirations of Malaysia Madani. Madam Speaker, the Honourable Member for Sri Aman proposed that the ministry introduce more comprehensive policies and programmes for all levels of society, especially through instilling the spirit of the Rukun Negara in daily life, and raised the issue of the ministry's short-term planning to strengthen national unity. Meanwhile, the Honourable Member for Batang Lupar also emphasised the elements of unity and integration among races in planning the implementation of Budget 2025. For the information of both Honourable Members, the ministry formulated the National Unity Policy in 2021, which is the ministry's main instrument in the framework of the national unity agenda. The instrument produced is in line with the Madani framework, which emphasises the Federal Constitution and the Rukun Negara in accordance with the formation of the nation and the integration of a multiracial, multireligious and multicultural society. This National Unity Policy outlines three objectives: to strengthen national unity and integration based on the Federal Constitution and the Rukun Negara; to form a national identity with the spirit of self-identity, patriotism, caring, tolerance, mutual respect and responsibility; and to produce Malaysians who appreciate and practise unity. To translate this policy into programme implementation, the ministry has produced the National Unity Action Plan 2021-2030, which provides comprehensive guidance to the ministry in developing a more inclusive and united society.
It also focuses on the government's efforts to improve inter-racial relations, promote national integration and tackle racial issues, involving cross-ministry and cross-agency programmes and activities. Among the short-term steps that have been and are being implemented by the ministry is introducing the Kembara Perpaduan Malaysia MADANI as a flagship programme that leads initiatives under the National Unity Agenda through three programme clusters, namely Semarak Kenegaraan, Semarak Perpaduan and Komuniti Rahmah, with the aim of disseminating knowledge, understanding and appreciation of the government's efforts in developing Malaysia MADANI. Under these three clusters, I will give a few examples, such as Semarak Kenegaraan. Among the programmes are Ekplorasi Rukun Negara, Debat Perpaduan, Kem Perpaduan Anak Malaysia and so on. Under Semarak Perpaduan, we have programmes such as the celebration of Minggu Perpaduan, Liga Sukan Uniti, Warisan Kita and so on. Under Komuniti Rahmah, among the programmes we are currently and will be implementing are Bakul Rahmah, Ronda Skim Sukarelawan, Karnival Ekonomi, Tuisyen Kami and so on. Throughout this year, we have implemented more than 300 programmes through the three clusters I mentioned earlier. Also beginning this year, the ministry, through the National Unity Department (Jabatan Perpaduan), has taken the initiative to empower and strengthen the role of Rukun Tetangga as progressive community drivers, yes. Eight focus areas have been identified to make Rukun Tetangga progressive community committees, namely first, economy and livelihood; second, community security and resilience; third, leadership; after that, community well-being; lifelong learning; environment, heritage and culture; and also creativity. Initiative...
Minister. Minister. Minister, about Rukun Tetangga. I once proposed it because, seeing that the allocation has already increased, right, now Rukun Tetangga only gets RM6,000 a year. Prices are rising, subsidies are falling, everything, right. So to empower them, can it not be increased? I once proposed RM10,000, Minister.
Thank you, Honourable Member. We will try. But apart from that, we have also been allocated RM20 million specifically for the capital of Progressive Rukun Tetangga. I will explain further, yes.
It is important because they are the grassroots, Minister. The grassroots of unity.
Yes. I understand. I understand. All right. This year, in the short term, we have already been allocated RM20 million. With this allocation, we have planned to empower Rukun Tetangga, named as Progressive Rukun Tetangga, and so far we have identified 152 Rukun
Tetangga as Progressive Rukun Tetangga, where we will hold various activities as I explained earlier, namely the eight main focus areas we will hold. For 2025, in the medium term, we will have at least 300 more Rukun Tetangga to be empowered or modelled as Progressive Rukun Tetangga. For 2026, in the long term, we will propose that this initiative to empower Rukun Tetangga be placed under the Thirteenth Malaysia Plan and implemented, yes. That is our planning. So, what the Honourable Member said about RM6,000, that is the annual amount for meetings and so on, right. But this, we will hold many more programmes such as economic ones. Rukun Tetangga began as a bastion of national unity and has now taken steps that can become the front line at the community level in helping to end poverty across the country in phases through the initiative to empower Progressive Rukun Tetangga. The ministry has succeeded in surpassing its target, and now, as I mentioned earlier, 152 Rukun Tetangga have been identified that can be known as Progressive Rukun Tetangga. For the information of the Honourable Member, several special initiatives of Budget 2025 were also announced by the Right Honourable Prime Minister to this ministry. One, is the implementation of the National Integration Unity Programme. Then, RM50 million to empower the role of the Rukun Tetangga authority. RM20 million, digitisation of these heritage materials under museums, archives and libraries, with an allocation of RM15 million. In addition is maintenance, maintenance of premises, yes. Difficult to say. All right. Through this allocation, the Ministry of National Unity will continue to empower the National Unity Direction through the implementation of various initiatives and programmes that can sustain the unity of the people while nurturing harmony among the multiracial society. The Ministry of National Unity will focus on four main areas in 2025, namely the unity ecosystem such as KRT Progresif, Eksplorasi Rukun Negara, third is the Inisiatif Harmoni MADANI and fourth is Komuniti Sosiobudaya. In 2025, the theme we will raise is Harmoni Dalam Kepelbagaian. Nowadays we often hear Harmony in Diversity. Now we will change the narrative for next year to Harmoni dalam Kepelbagaian. This theme reflects our commitment to strengthening national harmony by appreciating the cultural, religious and ethnic diversity that exists in our country. This diversity is a gift that makes Malaysia unique and special. As I said just now, the implementation of programmes or initiatives by the Ministry of National Unity will be divided into four efforts, namely this unity ecosystem focused on KRT Progresif, the 50th Anniversary of the Establishment of KRT, Konvensyen dan Anugerah KRT, Karnival Ekonomi, Sambutan Minggu Perpaduan, Jelajah Kembara Perpaduan and so on.
Under Eksplorasi Rukun Negara, we will hold the 55th Anniversary of the Rukun Negara, Simposium Pendidikan Rukun Negara, Kem Perpaduan Anak Malaysia, Jelajah Belia Rukun Negara, Konvensyen Sekretariat and so on. Under the Inisiatif Harmoni MADANI, we will hold the celebration of Minggu Harmoni Sedunia, Dialog Harmoni, Dokumentari Jejak Harmoni, Podcast Harmoni, Dokumentari Kisah Perpaduan and so on. Under Komuniti Sosiobudaya, under this are museums, libraries and archives. There are many programmes across all these agencies. Citra Nusa Muzium, Semarak Muzium, Archive Humanity, Karnival Baca Perdana and so on. The Honourable Member for Kapar proposed that the state of Kelantan be held up as an example of a successful unity concept in the country. For the information of the Honourable Member, the Ministry of National Unity will continue to support any state government that implements any unity initiatives or programmes in their respective states. This is because the ministry believes that efforts to foster unity among Malaysians of multiple races, religions and cultures do not rest solely on the shoulders of the Federal Government, but require the involvement of all parties, including all state governments.
Minister, if possible, the programmes under the Ministry of National Unity, including everything mentioned earlier, explorations, all sorts of things, right...
Ya.
Apart from cross-racial, meaning involving various races and various cultures, I think the Ministry of National Unity must also set an example by involving various ideologies, including the opposition, in all Parliamentary and State Legislative Assembly (DUN) constituencies. Thank you, Minister.
Thank you. This is about Kelantan again. Congratulations. Among the implementation of signature unity programmes in Kelantan, which are strongly supported by the ministry as well as other states through various initiatives such as, I will ― such as Pesta Angin Timur in Perlis and then Pertandingan Pidato Rukun Negara in Melaka, Program Gagasan Rumpun in Selangor, Pertandingan Dikir Barat in Kelantan, Unity Campfire in Pahang and Program Silang Budaya in Johor. Every state already has a signature program for unity.
This ministry does not overlook the fact that the state of Kelantan has its own uniqueness and diversity of ethnic heritage, which can become a strength in building a united and harmonious state. We understand that among the programmes is the Kelantanese dialect, which can be spoken by various races. Is that right, Honourable Member?
Betul, betul.
Wayang kulit and dikir barat performances that incorporate cultural stories from various races. Thirdly, is traditional Kelantanese food such as nasi kerabu, which has also become a choice across Malaysia. This clearly
shows that aspects of food, sports, arts, culture, language, music and so on can become a good foundation for racial integration in Kelantan, and I hope it will extend to other states as well. So, as the commitment of the Federal Government...
A small suggestion, Honourable Member. May I?
...the Machang district Unity Complex Building in Kelantan has been recorded as the first unity complex in this country. Yes?
May I pass? Thank you, Madam Speaker, thank you, Honourable Minister. We thank the ministry for recognising the culture and harmony shown by the state of Kelantan, even though only six per cent of residents are of other races, the rest being Malay, yet they live in a pure manner. So, what I want to ask here is what the ministry's efforts are to monitor. Sometimes reports and provocations spread through social media that actually worsen the atmosphere, fake news that distorts what actually happened, when the reality is that the people live in peace and harmony, and not a single non-Muslim is persecuted, but in fact they live in mutual respect. So, what efforts does the ministry make to address social media that reports fake news and spreads false distortions that can damage inter-racial relations in our country?
I agree with the Honourable Member. The big problem for us is social media. We conducted a study in Sabah and Sarawak to measure social cohesion, and it also stated that social media is a factor that greatly confuses the people. So, when the study was carried out, various factors were measured, and it was found that in Sabah and Sarawak, the level of social cohesion or unity is very high. Out of five, we got 4.17. One of the very clear factors is the social distance that exists in Sabah and Sarawak. Social distance, and another is intermarriage. These are two factors that greatly contribute to the level of social cohesion in Sabah and Sarawak. We have conducted a study carried out by Universiti Malaysia Sabah recently. We have already brought it to the Cabinet so that the results of that study are made known to the public. Thank you. Batu Pahat has raised a matter — Batu Pahat is here? Not here?
Ada, ada.
Here? Thank you. The complete construction of infrastructure for the National Archives of Malaysia in the state of Johor. For the information of the Honourable Member, the Ministry of National Unity, through the National Archives of Malaysia, is planning to apply for allocation under RMK-13 to build the Johor State National Archives of Malaysia building on Lot 18395 with SOCSO title, located in the city of Johor Bahru.
The building will be constructed and equipped with modern infrastructure according to international archival standards. This infrastructure will meet the needs for storing and managing important government records and historical documents of the state of Johor that have significant value in preserving the integrity, unity and sovereignty of the nation. The ministry is committed to ensuring that the building construction initiative runs smoothly and will take appropriate steps to expedite the use of the facility. Honourable Bukit Bendera, are you present? Thank you. Has proposed to add more government-subsidised taska, or under the Ministry of National Unity such as KEMAS. For the information of the Honourable Member, at present we have 1,781 Tabika Perpaduan with a total of 36,000 pupils. Meanwhile, we have 41 Taska Perpaduan with 1,000 children. Currently, Johor has 206 Tabika Perpaduan; followed by Selangor, 181; Sarawak, 172; Perak, 164 and so on. Compared with other taska, ours are indeed very few. If we look at the overall picture, the total number of taska and tabika across the country is more than 30,000. KEMAS more than 10,000, Ministry of Education Malaysia nearly 10,000, private 7,600. Total 30,000. Meanwhile, under us at the Ministry of National Unity there are only 1,780 plus 41 taska, about 1,800 or so. So, in this regard, the ministry has already conducted a survey of applications to expand taska in Malaysia. From that survey, we found that we could establish about 45 new taska. This is because the fees at Ministry of National Unity taska or tabika are very low, RM15 a month, compared with RM300 if one goes to the private sector. In other ministries, at the Ministry of Education Malaysia, it is perhaps around RM30. So, in this situation we hope we will get an allocation to establish more taska and Tabika Perpaduan in this country. For the course modules under Tabika Perpaduan, of course, we focus on education on the Rukun Negara. The Jom Urus Diri module. In this module we have basic multilingual communication teaching, Mandarin, Tamil, Iban, Kadazan and so on. The criteria for establishing a Tabika Perpaduan are not less than 500 residents in one area, not less than 200 housing units and so on. Honourable Langkawi has raised – is Honourable Langkawi present?
Tak ada.
Not here? But Honourable Langkawi's matter concerns The 19th Congress of South East Asia for the library. Never mind. So, Madam Speaker, that is the answer from our ministry and I thank you very much for this opportunity to...
Menteri.
Ada lagi?
About museums. I had the opportunity, with our Select Committee on Women, to go to museums, visit museums, the textile museum and so on. I feel, we feel, that the government needs to give a little more attention to our museums because we have a lot of our historical materials that need to be appreciated and well looked after. Unfortunately, it seems they are not sufficiently funded, Honourable Minister. If possible, please give attention because this is our nation's history. Future generations will refer to what we have now. If it is not looked after, it will not last long. Thank you, Minister.
Thank you, Honourable Member. We take note. Recently we also held an exhibition, Pesona Telepuk, at the Textile Museum, officiated by the Sultanah of Terengganu. That is one of them, and we have done many more for the Textile Museum.
We hope that the place will remain, because right now there are rumours that it will be moved. We have applied for it to become a [unclear] heritage site. It will not be moved because our materials are very sensitive to move and the cost of relocation is also quite large. So, perhaps the Honourable Member is aware that the authority is now under Khazanah Nasional for development.
One more thing, the library is also under the Honourable Minister, right?
Ya.
This is among the very, very important assets. I think many of the village libraries that were built, who knows how many years or decades old they are and what condition they are in. We are in the process of reaching an aging nation, I think those are among the assets that need to be preserved and upgraded, value added, air-conditioned, and provided with facilities not only for students and young people, but also for pensioners, senior citizens and so on, because these are among the ways for us to build our nation, to unite senior citizens and children so that we can achieve unity as the Minister has said. Thank you.
Thank you. Thank you, Honourable Member, for your concern about all of these under the Ministry of National Unity, and we will strive to further improve in all measures or strategies to strengthen the policies and activities under our agencies: archives, museums and libraries. That is all, thank you.
Thank you, Honourable Minister. Now I invite the Honourable Minister from the Ministry of Women, Family and Community Development to respond.
Thank you, Mr Speaker. Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, I record my appreciation and thanks to all Honourable Members who have debated and touched on issues under the purview of the Ministry of Women, Family and Community Development (KPWKM) while taking part in the debate on the Budget 2025 at the policy level over eight days, from Monday, 21 October to Tuesday, 5 November 2024. I appreciate all views and proposals that have been put forward and will be taken into account in KPWKM's future planning, including the improvement suggestions proposed by the Honourable Members. Insya-Allah, today I will respond to the questions that the Honourable Members have raised to KPWKM. First, Mr Speaker, Honourable Rantau Panjang wants an explanation regarding the allocation given to the Department of Child Development for the year 2025. He wants certainty on this because the details of the allocation to the department were not stated in Budget 2024. As announced last year, JPKK was officially established on 1 September 2023. Therefore, the operation of JPKK for the year 2024 uses the existing policy operating expenditure allocation totalling RM116.7 million. Meanwhile, for the year 2025, JPKK has been allocated operating expenditure totalling RM127 million, which also includes RM10.8 million for course programmes and RM25 million allocation for B.11 – General Treasury Services. Next, Mr Speaker, Honourable Bangi has proposed...
May I ask for a brief explanation, Honourable Minister?
Ya.
Thank you, Honourable Member. Thank you, Honourable Speaker. I extend my thanks and congratulations to KPWKM on the allocation received, and I would like to know, from the allocation of about RM127 million, whether there are any additional posts or what progress will be made to truly fulfil the actual objective of establishing the Department of Child Development? Please explain.
Thank you, Honourable Member. Actually, for the expenditure in this Budget 2025, we will discuss it in the near future. We have a session to discuss how it will be implemented. Not only JPKK, but also other agencies, because in receiving that allocation, we also have new allocations. I mean, new matters, so they need to be discussed together. Insya-Allah, because we need to spend it at the beginning of the year
next year. Therefore, we will discuss it together later, and you may ask again how we will implement it. Thank you, Honourable Member. Next, from Honourable Bangi who proposed that a special allocation under KPWKM be given to parties providing services and education to children with special needs, such as the Kajang Special Children Association. Is Bangi here, yes? Bangi is not here? Oh, we will give a written reply to him. Mr Speaker, the next issue is from Honourable Bentong. Bentong is here? Just came back? Bentong? Not here? Not here. Okay, continue. Pasir Puteh has no question here. Honourable Arau, also not here, right?
Tak ada.
Save time, thank you. Honourable Bukit Bendera is here, Mr Speaker. Honourable Bukit Bendera has proposed that JKM review the taska operating SOP to allow taska to accept more children than the existing ratio to offset rising costs. For the information of the Honourable Member, there are two factors that need to be taken into account in determining the number of children that can be accepted in the operation of a taska. First is complying with the ratio of caregivers to children in taska under the Child Care Centre Regulations 2012. This ratio varies subject to the category of children, whether OKU (persons with disabilities) or non-OKU, as well as age group. As an example, for non-OKU children aged three years and above, the ratio is 10 children to one caregiver. Meanwhile, for OKU children in the same age category, the ratio is 10 children to three caregivers. Second is the factor of taska floor area. The minimum floor space required for each child at child care centres is 2.5 square metres for home-based taska and 3.5 square metres for workplace, community or institution-based taska. This regulation takes into account the safety and well-being of children in taska, covering safety, supervision and health. For example, the speed of evacuation during fire, or evacuation, with permission, as well as the sensitivity and manageability of caregivers towards the children under their care. KPWKM is currently in the process of reviewing the Child Care Centres Act 1984 and the Child Care Centres Regulations 2021, which cover matters related to registration, inspection and enforcement, to improve services in the care industry in line with current needs. I take note of Honourable Bukit Bendera's proposal for further study by JKM. Thank you, Honourable Member. Next, Honourable Rantau Panjang also touched on the impact of the increase in the minimum wage from RM1,500 a month to RM1,700 a month next year on the increase in taska fees. As Honourable Rantau Panjang is well aware, KPWKM does not set a floor price or ceiling price for taska fees.
Taska registered under JKM are private taska that operate as businesses. They require creative efforts from operators to ensure taska businesses can grow well and be sustainable. These fee rates are also influenced by various factors. Among them are the standard and quality of services offered, locality, and supply and demand factors.
Therefore, agreement between taska operators, caregivers and parents must be reached to obtain mutual agreement on this matter. However, at the same time Honourable Member, it should be noted that the government's intention to raise the minimum wage rate is for the well-being and great benefit of the people. I believe my colleague, Honourable Minister of Human Resources, has explained this matter, if I am not mistaken, because it falls under the purview of the Ministry of Human Resources, Honourable Member, yes. Thank you.
YB Minister, Bangi just now. I – I mentioned a name just now. Sorry, I missed it.
Question, question. Okay.
Honourable Minister, just a little related to the taska issue. May I? Just a little, yes.
Boleh je.
Yes, thank you, Honourable Member. Taking into account what the Honourable Minister just mentioned, the conditions imposed on taska operators, their area, the number, how many children are cared for. So, these are among the constraints on taska operators in increasing the number of children to overcome management cost problems. So, this causes some of them, perhaps because of the pressure of this minimum wage, some have to close their taska and this affects... Because we know these taska are a support system for women workers. My question is, will the government consider, especially in terms of the conditions, in terms of the number, so that it does not burden taska operators, and is it possible for a future proposal that taska operators who are important in B40 areas, where parents have to leave their children because they are working, can be given some assistance to ease the burden so that high fees are not imposed on parents who need private services.
Thank you, Honourable Member. Your earlier question concerned the floor area and increasing the number of children. Honourable Member must be aware that in terms of floor area or infrastructure, that is not under KPWKM. Before it is allowed to operate as a taska, it goes through KPKT and also the local authority, with permission, so that they obtain that approval, because they take note of or take action based on the safety and well-being of the children.
So, if they allow such things to be permitted, then perhaps it will affect the safety of children and in terms of what Honourable Member stated to help B40, I dare not make any agreement or commitment here. But we will take note and consider this matter so that perhaps we can find a way to help. If the promise cannot be kept because it involves government budget. The government budget has already been tabled. If we can consider it, insya-Allah we will help. Thank you.
Yang Berhormat.
Menteri.
Okay. Assalamualaikum. Thank you to the Deputy Speaker. I raised the issue of the policy on protection for women's safety. We understand that last week another murder case occurred involving a woman and her father because a marriage proposal from a man was rejected. So, what action is now being taken by the ministry, because we see that the trend of women's safety in Malaysia is now very threatened.
Honourable Member, repeat which policy?
The policy on security and protection of safety.
Dasar keselamatan.
Menteri.
I have not received anything about this in the debate.
I did debate this issue.
So, if – was it included?
Ya.
I will refer to it. I will give a written reply later, yes, because I have not received it. Perhaps it was not prepared...
Menteri.
Or perhaps it is being taken note of by other ministries, because this Women's Safety Policy is not ours alone. As a whole, it needs to be taken note of by the ministries responsible for security. However, we also carry out our duties to help women by giving a little– we also do help, especially in terms of several matters such as if there is domestic violence, or if there is sexual harassment, all of that we do have, and also counsellors. Thank you. I will refer to it here later. This is an issue of protection for women. It is indeed a broad issue that crosses the jurisdiction of various ministries as stated earlier.
Therefore, for my response today, I would only like to touch on the initiatives taken by us, KPWKM alone, namely the initiatives implemented by KPWKM and its agencies under its purview, including updating the National Women's Policy (Dasar Wanita Negara) by introducing a specific pillar that emphasises women's safety. Second, updating and improving the Women's Development Action Plan (PTPW), which will also take into account the safety aspect. Third, legislating the Anti-Sexual Harassment Act (Akta Antigangguan Seksual), which we have passed, which was gazetted on 18 October 2022, and carrying out advocacy programmes on it. Fourth, establishing the Anti-Sexual Harassment Tribunal under the provisions of Act 840. Fifth, implementing the Legal Clinic Programme initiative, namely the Legal Literacy and Women's Rights Programme (IRIS). Is there anything else, Honourable Member? I have not finished answering yet.
Honourable Member, I would like to propose, if possible, because of the deaths of Cikgu Kartini, the deaths of Cikgu Istiqomah, and the death in Penang. All three involve women who were brutally murdered. So, could the ministry work with other ministries to set up a special taskforce to monitor, study and take specific action, because these have occurred in succession and their killings are extremely cruel. Thank you.
Okay. Insya-Allah, we will discuss that with the other ministries. As for the rest, these are routine matters, such as providing shelters. The Honourable Member already knows this, right? What remains is the so-called taskforce. Perhaps we can discuss it, but we want to discuss it with – we want to look at the relevant ministries, because this does not involve us alone. As I stated earlier, it involves several ministries, especially if there is the police. Sometimes there are matters that need to be – there are certain matters that need to be discussed in a way that, perhaps, when certain evidence has not yet been obtained, they will not inform us. Usually we work with the D11 unit for cases like these, no matter where the women are. In any state, if needed, we do work with D11. Thank you, Honourable Member.
YB...
Mr Speaker, earlier the Honourable Member for Bangi proposed...
Before that, Minister, Ampang. I actually want to continue, or rather the question raised earlier by Rantau Panjang concerning taska. I see the constraints we see now, when the support system, especially for working women, is not robust, namely the taska...
which, as the Minister said, are sometimes beyond the ministry's jurisdiction when it comes to premises and so on. But is the ministry making any effort, just as we assist PDK in providing grants to those who implement the Community-Based Rehabilitation Programme for persons with disabilities (OKU)? Could we, or could the ministry, consider some sort of budget that could help taska or channel financial assistance directly to families who are truly in the B40 group? So, two matters. First, whether the PDK model can be adopted, and second, we help B40 families directly, so that we can add to, or give assistance for, taska fees. Thank you.
Thank you, Honourable Member. There were two matters earlier concerning PDK and also taska. Actually, as the Honourable Member knows, PDK falls under the community. However, we do provide assistance to PDK. We pay those who run it, especially the caregivers, and we help them through that. Another matter is taska. For taska, eligibility to apply for subsidies, we do have subsidy applications. Another is to run programmes for taska, and also...
As for PDK, if they apply, as long as they apply and are registered, we usually do provide allocations. However, it is not a fixed grant as such. But, to pay the caregivers, we do help with RM1,500. If they wish to pay more than that, we do not stop them. That is up to each PDK. As for taska, to apply for childcare fee subsidies, the income eligibility threshold for institutional taska is a per capita household income of parents or guardians of RM800 per month for urban areas, and a per capita income of parents and guardians of RM500 for rural areas. The eligibility threshold for community taska is a household income of RM5,000 and below for all areas. So, to help parents who are facing this burden, yes, the rate is RM180 per month. We help to reduce – the government helps by one month for eligible parents who send their children to registered taska. So, there are two forms of assistance. For the programme, we also provide that. And another, they can apply under the grants we have. But we cannot give to everyone, yes. Thank you.
Honourable Minister, I just want to ask for a little clarification. We have assistance relating to taska at the workplace. So, how far has the response been? And can this kind of assistance also be channelled? That is, for the establishment of taska in places where the need is critical. That is, even though these are not government premises, they make an important contribution, especially to the women of the B40 group mentioned earlier.
As mentioned by Ampang earlier, I agree that we should look at it again. This is because it is a necessity to provide support to women workers in our country.
Yes, thank you, Honourable Member. I think anyone who wishes to apply may try. This is because we will first conduct checks on whether they are eligible to receive, and whether they can be assisted or not. But to deny them the right to apply, I think that cannot be done. However, I believe they can apply and we will consider it according to their circumstances, yes. Thank you. The Honourable Member for Bangi earlier. Held over here. Yes, the Honourable Member for Bangi proposed that special allocations under KPWKM be given to parties providing services and education to children with special needs, such as Persatuan Kanak-kanak Istimewa Kajang. It is an association; if it is registered, Honourable Member, thank God if it is registered, it is easier for us to help. However, for your information, KPWKM, through the Department of Social Welfare, provides government financial assistance to voluntary welfare organisations that provide care, protection and rehabilitation services to persons with disabilities. So, as I stated earlier, they must register. This government financial assistance is intended to be temporary and as an incentive to support the parties providing such services. This assistance aims to ease the burden of covering part of the costs borne by PSK in providing services to KPWKM's target groups. Every consideration for approval of government financial assistance also takes into account the financial capacity of PSK in terms of its current assets, income and expenditure. This is in line with the principle of shared responsibility for welfare through strategic cooperation between the government and PSK. In 2024, a total of 212 voluntary welfare organisations across the country received government financial assistance amounting to RM18.3 million, benefiting more than 6,900 of their clients. So, specifically regarding Persatuan Kanak-kanak Istimewa Kajang as mentioned by the Honourable Member for Bangi, I am pleased to inform that the association received government financial assistance amounting to RM422,510 from 2022 to 2024. Just for your information. I would like to take this opportunity to record our appreciation to PKIK and PSKs like them who are steadfast and committed in providing services to KPWKM's target groups. What they are doing is a noble thing, very noble, with permission. Therefore, their dedication in this matter is highly appreciated by us all. Next, Honourable Member – this, Tumpat, has already been answered earlier.
Honourable Member for Rantau Panjang again. Many from Rantau Panjang have asked. He also wishes to know the total number of recipients of assistance and the number of recipients who have successfully escaped poverty. For the Honourable Member's information, based on statistics from the Department of Social Welfare, as of August 2024, there were a total of 543,086 welfare aid recipients throughout Malaysia, with allocations spent amounting to RM1.73 billion. For the period January to August 2024, a total of 60,742 recipients had their assistance terminated for various reasons. Of that total, 14,937, or 24.5 per cent, of recipients were able to become self-reliant and no longer needed JKM assistance to sustain their livelihoods. There are several programmes we carry out to help them. Among them, first, is the Two Years Exit Programme or 2YEP, as we call it. This is a programme to help JKM aid recipients move towards self-reliance and survival, not depending on assistance forever, by empowering clients to continue their lives. For the period 2016 to 2023, a total of 6,871 recipients took part in the 2YEP programme, and 1,597 recipients, or 23.2 per cent, had their assistance terminated. Permission to drink, yes. Thank you. The second is the programme...
Terima kasih...
The Honourable Member has not finished answering yet.
Oh, not finished yet.
The second is the Programme for Empowerment and Mindset Transformation of Aid Recipients, namely PT-MINDA JKM, which is a programme to improve self-motivation, knowledge and skills related to parenting and personal financial management for aid recipients so that they strive to break out of the cycle of poverty. For the period 2022 to June 2024, a total of 1,081 recipients took part in this programme. Third, the B40 Transformation Programme at Universities, namely TransB40@Universiti. This is an advocacy programme on the importance of education in academics or skills among children of JKM aid recipients to improve the socio-economic status of families and escape poverty without passing it on to the children. The programme is implemented through strategic cooperation between JKM and IPTA and IPTS. For the period 2023 to July 2024, a total of 510 children of JKM recipients took part in this programme. Did the Honourable Member want to ask something earlier?
Thank you, Honourable Member, for the opportunity given. Thank you for the answer. Understanding the burden borne by the government, and as we see in our society, sometimes people really depend on government assistance as if they want it to continue for life, if the government could help. This is an attitude that we very much regret, and we do not like such negative attitudes.
So, I would like to know, out of the total of 543,048 who receive assistance from JKM, how many of these recipients are those who truly cannot be rehabilitated, for example persons with disabilities (OKU) or senior citizens? And how many have hope of being rehabilitated? So far, what awareness programmes, apart from the 2YEP that we run, are there to ensure that groups who have hope and potential do not continue to depend on the government? So, this matter needs cross-ministry collaboration, I think. Not solely under the Ministry of Women, Family and Community Development.
Nevertheless, I congratulate you on the good efforts, but we need to find a way to solve the problem of people continuing to depend on government assistance.
Yes, Honourable Member. It also depends on the recipient themselves. We certainly encourage it, which is why we work closely with NGOs and corporate bodies to link these people up to provide them with jobs. However, it is also up to those who, so to speak, truly want to break out of the cycle of poverty. But the statistics, if I may, I will provide in writing, yes. First, I thank the Honourable Member, because all this time we have been looking for ways, and I also thank our officers at JKM who constantly seek ways to get them out. But we want to get them out; if they themselves cannot continue their efforts as their other peers do. So, we also need to understand this, Honourable Member. Thank you. I now move to this, Rantau Panjang again. [Laughter] There is more. Mr Speaker, this is the Honourable Member for Rantau Panjang who wishes to know the actions taken by KPWKM in empowering single mothers. Honourable Mr Speaker, KPWKM is always committed to efforts to empower and upgrade the economic status of women, including single mothers, by placing the main focus on planning and coordinating women's empowerment programmes, including capacity building through its agency, the Department of Women's Development. KPWKM actively organises capacity-building programmes such as advocacy programmes, income generation, and socio-economic programmes for vulnerable women. The programmes implemented can also encourage an increase in the number of women participating in the labour market, and can generate family and national income. For the period January to September 2024, KPWKM implemented a total of 512 programmes in the women and economy domain. These programmes were attended by 8,182 women participants, including single mothers, across the country, to upgrade their economic status and increase their income, covering income generation programmes and socio-economic programmes for women.
In addition, JPW has developed a specific empowerment programme known as the Single Mothers' Love Programme (PROKIT), Honourable Member. It was piloted in 2023, involving an advocacy phase with 300 participants and a guidance phase involving 90 single mothers. PROKIT is implemented to help single mothers who face challenges in developing their potential, handling claims after divorce, and managing finances. So, this programme covers three modules, namely potential development, legal skills and financial management. Programme participants will undergo intensive training and guidance from mentors for six months to ensure the programme's objectives are achieved. Starting in 2024, the PROKIT programme has become a permanent programme for single mothers' empowerment implemented by JPW. So, in addition, JPW also collaborates with the Ministry of Rural and Regional Development (KKDW) to empower women's communities, including single mothers in rural areas, in implementing women's empowerment programmes at village community centres. Besides that, we also have a programme through the National Welfare Foundation (YKN) that introduced the Dynamic Women Programme, previously named Wanita Bangkit. Wanita Dinamik KPWKM is an enhancement of the Wanita Bangkit@KPWKM MyKasih Kapital programme. A one-off business incentive of RM500 is given as a starting effort to encourage women to venture into business on a small scale. From 2023 until September 2024, more than 12,000 women have benefited from this programme. So, if that is multiplied by RM500, how many millions is it, RM12 million, yes. Thank you.
Honourable Member, may I interject briefly? Thank you for the hard work done by the ministry. However, when we go down to the ground, there are also many complaints about the welfare of single fathers. Honourable Minister, we already look after single mothers, but single fathers also say that no one cares for them, especially poor single fathers, I mean.
Yang Berhormat...
So this is what we receive from the ground. Up to now, do we have a comprehensive census of the total number of single mothers across the country?
Single mothers, we do not have a total number of single mothers because KPWKM and JKM provide welfare assistance to those who are eligible, that is, we use means-testing, whether they are in extreme poverty or not. If they are eligible, it does not matter, the same applies to single fathers. We do not give only to single mothers; if the family is poor or unable to cope, regardless of whether they are male or female, they are eligible to apply for welfare. After that, Honourable Member, as you have been there, there will be an investigation first, to see whether the person is eligible or not, and we look at the means-test.
So, it is not – regardless of whether they are a single mother or a single father, as long as they are eligible. If they say they are poor, some people do feel that they are poor. They should prove that they are in difficulty. That is why our officers go to homes to ensure these people really need help and are eligible for it. I have one last question, this one is also the Honourable Member's. Thank you. This Honourable Member touched on the issue of incentives given to JKM staff who serve as frontliners during floods. For the Honourable Member's information, in the context of disaster management, JKM is the agency responsible for operating and managing temporary relief centres (PPS) to provide welfare needs and services to disaster victims. The personnel at these PPS consist of JKM officers and staff. They are civil servants and are subject to the application of existing directives, circulars and governance relating to them. This includes matters related to travel claims, overtime allowances or OT, replacement leave facilities, and so on. So this is the privilege or entitlement, with permission, that they receive as government officers. That is all, Mr Speaker. With that, Mr Speaker, my winding-up session on behalf of the Ministry of Women, Family and Community Development for the policy-level debate of the 2025 Budget in the Dewan Rakyat today comes to an end. Once again, I wish to record my appreciation to all Honourable Members who have voiced views, proposals, improvements and criticisms involving the target groups under KPWKM. I value everything that has been raised, and KPWKM will take appropriate action based on the input received, including the statistics we promised earlier. The cooperation and support shown by all Honourable Members towards the ministry's initiatives, especially in handling issues that are very close to our hearts, are hoped to bring greater benefit to the people of Malaysia as a whole. That concludes my remarks, thank you, Mr Speaker.
Thank you, Honourable Minister. Honourable Members, today's sitting of the House is adjourned until 10.00 a.m. on Tuesday, 12 November 2024.
[The House was adjourned at 7.00 p.m.]
Special ChamberSpecial Chamber
[Timbalan Yang di-Pertua (Dato’ Dr. Ramli bin Dato’ Mohd Nor) mempengerusikan Mesyuarat]
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Construction of New Jelebu Hospital Deputy Yang di-Pertua [Dato' Dr. Ramli bin Dato' Mohd Nor]: PleaseSpecial Chamber
Yang Berhormat.
Bismillahi Rahmani Rahim.
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, thank you for giving Jelebu the opportunity to raise several matters relating to the motion that has been submitted concerning the construction of a new Jelebu hospital.
The title, as I have mentioned, concerns the issue of constructing a new Jelebu hospital, submitted to the Ministry of Health (KKM). For the information of Mr Speaker, the Jelebu Hospital has provided secondary services to residents around the Jelebu district, estimated at 44,200 people in 2020, and currently approaching 52,000 people. The annual population growth rate in the district is 0.1 to 0.2 per cent, based on the report of the Department of Statistics Malaysia.
The official number of beds in the hospital is around 76 at present, and the Bed Occupancy Rate (BOR) is within the range of 55 to 60 per cent.
However, there is a key service that cannot be provided, namely surgical services. This is because the hospital's original operating theatre is located in a building that is 128 years old, whose infrastructure does not meet the basic standards of an operating theatre. Therefore, surgical cases are not safe to carry out, and all cases involving surgery must be referred to Hospital Tuanku Jaafar, Seremban, which takes nearly one hour, that is, almost 50 kilometres. As a district hospital that has been a cluster of Hospital Tuanku Ja'afar Seremban since 2018, there has been an increase in the number of patients attending the specialist clinics and wards every day.
In addition, the existing space is unable to accommodate treatment operations, specialist clinics, consultations and record storage. The existing space operates in the emergency department area, which is very cramped and offers little privacy for patients. I would like to thank the Honourable Prime Minister, because in the 2023 Budget speech, he announced preliminary work to upgrade 26 hospitals, of which Jelebu is one of the hospitals involved.
The state health department has identified six lots of privately owned land totalling 42.103 acres for the construction of the Jelebu Hospital, that is, a new building located one kilometre from the existing hospital. This replacement hospital is very much needed and should have at least 76 beds, including an intensive care ward and an operating theatre. The existing hospital may continue to operate as a rehabilitation centre for post-stroke and geriatric care, using the concept of obtaining patient food supplies from the Food Service and Dietetics Unit, Jelebu Hospital.
I would like to ask the Honourable Minister what the current status of the upgrading process for this Jelebu Hospital is, and my great hope is that the Jelebu Hospital project can be expedited, considering the urgent needs of the people of Jelebu themselves. Thank you.
The Honourable Minister.
Thank you, Mr Speaker. Thank you to the Honourable Member of Parliament for Jelebu, who is very concerned about the need for health facilities, especially since the age of this Jelebu Hospital has now reached 129 years. I also understand that these questions have frequently been submitted by the Honourable Member for Jelebu to be answered by the KKM. As long as it is not resolved, the age of this hospital will continue to increase.
The Jelebu Hospital is a hospital of non-specialist status, under the Negeri Sembilan cluster. This hospital provides medical services to 47,400 people at present. The Ministry of Health is aware that there is a need to build a new hospital as a replacement for the Jelebu Hospital. This is due to the location and the condition of the existing hospital, which is no longer conducive.
Furthermore, upgrading works are also no longer cost-effective, owing to the age of the hospital building, which has reached 129 years, and the hilly topography, which makes upgrading work difficult. In addition, the need for decanting must also be taken into account in order to continue the existing services.
The Jelebu Hospital is included in the list of hospitals that will undergo preliminary works for upgrading and refurbishment of 26 hospitals and institutions of the KKM that have been approved in the Third Rolling Plan (RMK-12). These preliminary works are the implementation of a building condition assessment (BCA), which is currently at the planning stage and the procurement of consultancy services. The procurement process is expected to begin in December 2024, and the study implementation period is nine months.
The findings from the BCA will become the reference basis for the scope of upgrading works for the existing Jelebu Hospital in future. Although it is of non-specialist status, the Jelebu Hospital still offers specialist and sub-specialist services through periodic visits by medical specialists from Hospital Tuanku Ja'afar, Seremban. Neonatal hearing screening services, echocardiogram tests and stress tests can also be carried out at the Jelebu Hospital.
The specialist visiting schedule is as follows:
(i) emergency medicine five times a week;
(ii) general medicine four times a month;
(iii) geriatrics twice a month;
(iv) paediatrics twice a month;
(v) psychiatry twice a month;
(vi) general surgery once a month;
(vii) orthopaedics once a month;
(viii) obstetrics and gynaecology once a month;
(ix) respiratory medicine once a month;
(x) dermatology once every one or two months; and
(xi) nephrology once every three months.
With regard to the site proposal, the Ministry of Health has identified a potential site located one kilometre from the location of the existing hospital, and it is currently at the early stage of site assessment. That is, it is located in Mukim Ulu Triang. The construction of a new Jelebu Hospital will in future provide a more complete facility to deliver specialist services on a cluster basis with a lead hospital, Hospital Tuanku Jaafar, Seremban.
However, this plan still requires consideration and approval by the government. With regard to the acquisition of land for the site of the new Jelebu Hospital, the State Land Office (JKN) of Negeri Sembilan is preparing a cost estimate for the preparation of a Preliminary Calculation Plan. Funds will be disbursed by the KKM based on the application from the JKN. That is all, thank you.
Question from the Honourable Member for Jelebu.
Mr Speaker, I have studied the Honourable Minister's answer on the matters I raised.
I would like to thank you because some of my supplementary questions have already been answered by the Honourable Minister.
However, Mr Speaker, we know that the status and issue I have raised have been ongoing for several years now. I thank the ministry for paying some attention to resolving this problem. Certainly, for the time being there is no very urgent need for one or two years, because 76 beds can serve 44,047 patients.
But Mr Speaker, we cannot escape the problem of human ageing. Jelebu is not exempt from experiencing this ageing problem. Our problem is that when this ageing occurs, within a period of five years from now
and at that time the hospital is not being moved by any effort to build a new one. At that time we will face problems. The people of Jelebu will face problems.
Therefore, Mr Speaker, I hope the ministry will give attention beyond merely upgrading the existing hospital, which is already 128 years old. Mr Speaker, please bear in mind, Saudara Mr Speaker, that many people seek treatment at this hospital. Apart from upgrading, observation and what I said, the government's attention to ensure that this hospital can proceed with its new construction efforts must be implemented.
My question, Mr Speaker, is this: now, Mr Speaker, I have been informed, yes, that there are more than 20 doctors serving on a permanent basis, and for specialist doctors, it is on a rotation basis, as the Minister answered. But I see, Mr Speaker, that the Honourable Minister has vacancy warrants that can be filled for specialist hospitals. We have vacant warrants for these positions to be filled.
For the record of the Dewan Rakyat, specialist doctors at the hospital do have warrants that can be filled for specialist doctors in Jelebu, apart from nine external vacancies for medical officers, with permission. But up to today, none have been filled.
The hospital has been there for a long time. Doctors, doctors, well, new doctors, all the young ones are there. But the specialist doctor positions are vacant and we have not filled them. There are nine medical officers that we have not filled. I hope that for this matter we can get some explanation from the ministry: why these warrants have not been filled when our needs for the hospital have not yet been met. Then, regarding filling these positions, we also have not filled them. Can I get an explanation from the Honourable Minister? Thank you, Dato' Speaker.
Menteri.
Thank you, Mr Speaker.
That is a very precise question, and I also want to answer why the Jelebu Hospital, although still in preliminary works and a study, we find that the need for our government's or our society's ageing risk is very, very clear at this time. The potential of the Jelebu Hospital to offer geriatric services and services related to post-stroke or rehabilitation is very functional if the 129-year-old Jelebu Hospital is given priority for the construction or addition of a new building.
The site has already been identified, and as long as we, with permission, delay this construction, the cost of building the hospital will increase. For example, if the Honourable Member for Jelebu had proposed this hospital five years ago, the likelihood is that the price of one bed would be RM1 million or RM1.1 million. Now, the cost is around RM1.5 to RM2 million. If we wait even longer, this will make the cost to the government more burdensome. This ageing society is evident based on data and evidence-based findings. It is not that we see it merely from the talk at the coffee shops, Mr Speaker, but it is clear that our society is living longer. Especially women.
Regarding the filling of vacant specialist positions, usually, the KKM is waiting for placements, and these vacancies depend on the supply of specialists who wish to be placed at the hospital concerned. Sometimes we have specialists, but in the context of the Jelebu Hospital, we do not have complete facilities to enable those specialists to provide proper or functional services.
Apart from that, I will also check on the vacancies for Medical Officers (MO). Although there are nine vacant positions at present,
there are 10 MO officers who are in contract status, Honourable Member.
At present, the Honourable Prime Minister has announced that we will convert these contract officers within a period of several years, totalling 12,000.
Now we are in the second phase and cohort, where permanent job offers have been given. After this, these processes will, these positions will be filled, and the MO contract officers currently at the Jelebu Hospital will not necessarily remain at the facility, but will be transferred if they receive these permanent offers.
As for specialist positions, it certainly depends on supply. As an example, I take geriatrics as mentioned in the question of the Honourable Member for Jelebu. Geriatrics is a service for senior citizens. We currently have nearly about 30 specialists across the whole country, and the production of these specialists takes a period of time, and those currently undertaking this specialisation are only around three to four persons.
It is certainly rather difficult for us to send specialists to every hospital.
However, following the planning we have made from the perspective of this preliminary work, I ask the Honourable Member for Jelebu to inform the voters and the community that this preliminary work is not a confirmation to obtain a hospital.
But we are studying how many beds?
Do we need 76 beds? Do we need 100 beds? After this study within a period of nine months, we will submit a proposal to the Ministry of Finance to state that Jelebu has completed all procedures for building such a hospital. So the process will take the Honourable Member for Jelebu, within this preliminary study period, nine months to two years, and further to apply to the Ministry of Economy will take additional time. I also take this opportunity to mention that the Honourable Member for Pontian has also frequently mentioned matters concerning the Pontian Hospital. The process is the same and it is still in preliminary works to complete the hospital. That is all, thank you.
Thank you. Secretary.
Dato' Mr Speaker, may I make a brief addition. I want to register it in this Dewan Rakyat.
In the Special Chamber.
I mentioned this as early as 2019, Mr Speaker. Fighting for the new construction of the Jelebu Hospital. Second, Mr Speaker, all the districts in Negeri Sembilan already have this new hospital. Only Jelebu does not have a new hospital, Mr Speaker.
I am not comparing one district with another district, but we have to be fair to everybody, the community in Negeri Sembilan, with permission, Mr Speaker. Thank you.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Need to Maintain and Repair Damaged and Narrow Bridges in Kubang Kerian ParliamentSpecial Chamber
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Alhamdulillah. [Reciting selawat] Thank you, Mr Speaker. For the information of the Honourable Minister, I have received many complaints regarding narrow bridges and several damaged bridges that endanger local residents. The condition of these bridges is very worrying because they pose a great danger to the local residents who use them every day.
As the Member of Parliament for Kubang Kerian, I have also raised this problem several times with the Honourable Minister through debate in the Parliament session. In addition, the Service Centre (Pusat Khidmat) has also submitted an application to list the repair and upgrading of the bridges to the Ministry of Rural and Regional Development (KKDW) as well as the Department of Irrigation and Drainage (JPS).
However, so far there has still been no feedback and no action taken to resolve the problem. For the Honourable Member's information, the bridges I am referring to number approximately 24 on the list. I will read them one by one for the record of our Special Chamber. The first, for repair:
(i) Bechah Village Bridge in Mukim Terap;
(ii) Marak Village Bridge in Mukim Marak;
(iii) Teras Village Bridge in Mukim Chepa;
(iv) Gertak Kecupu Village Bridge in Mukim Mentuan;
(v) Panjang Village Bridge, Binjai in Mukim Binjai;
(vi) Ketitir Bridge, Seribong Village in Mukim Seribong;
(vii) Likong Limbat Village Bridge in Mukim Seribong;
(viii) Back Bridge of Tiong Mosque, Kubang Kachang in Mukim Kubang Kachang;
(ix) Tok Ayah Fakir Bridge, Ceruk Berlingkup Village in Mukim Nilam Baru;
(x) Tembesu Bridge in Mukim Tembesu;
(xi) Lating Village Bridge in Mukim Lating;
(xii) Wak Lib Bridge, Lating Village in Mukim Lating;
(xiii) Keling Village Bridge in Mukim Keling;
(xiv) Seberang Belimbing Limbat Village Bridge, Selor in Mukim Selor;
(xv) Pasir Ara Village Bridge, Gong Dermin in Mukim Gong Dermin;
(xvi) Gong Dermin Penghulu Lane Bridge in Mukim Gong Dermin;
(xvii) Dalam Kor Village Irrigation Channel Bridge in Mukim Padang Enggang;
(xviii) Pengkalan Kubor Village Bridge, Aur Duri in Mukim Aur Duri;
(xix) Stan Village Bridge in Mukim Stan;
(xx) Telok Kandis Village Bridge in Mukim Telok Kandis;
(xxi) Gertak Lembu Village Bridge in Mukim Telok Kandis;
(xxii) Selingkuh Mat Ripin Village Bridge in Mukim Telok Kandis;
(xxiii) Belukar Jenerih Irrigation Channel Bridge, Keladang Village in Mukim Keladang; and
(xxiv) Lubok Jambu Village Bridge, Kedai Mulong in Mukim Lubok Lambu.
Therefore, I request that the ministry consider carrying out the repair and upgrading works for the bridges as referred to immediately, because some of them have become a bottleneck to routes, disrupt travel and endanger residents because of the narrow and dangerous condition of the bridges. That is all, thank you.
The Honourable Minister, please.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh.
Waalaikumsalam.
Firstly, I would like to extend my thousand thanks to the Honourable Dato' Dr. Speaker, although this question should have been number four but was read out as number two just now.
Actually, I requested a slight arrangement because I had a meeting outside just now. Nevertheless, I would like to thank my friend, YB Pontian, who gave way to me again for question number two.
Mr Speaker, the Ministry of Rural and Regional Development (KKW) notes and greatly appreciates the Honourable Member's concern regarding the dilapidated and narrow bridges in the Kubang Kerian Parliamentary constituency. For the Honourable Member's information, the ministry introduced the Rural Bridges Programme (JMLB) in 2021, aimed at expediting the implementation of projects to replace dilapidated bridges and bridges collapsed due to disasters with permanent bridges in rural areas. If these bridges are not upgraded or replaced, they will endanger the safety of residents and cause residents' connectivity to be cut off.
For information also, approval of JMLB projects is based on applications by the state government through the State Economic Planning Unit (UPEN), submitted to this ministry according to the priority list of each Rolling Plan. With regard to the application to upgrade the 24 bridges raised by the Honourable Member, this ministry, together with the Public Works Department (JKR) Malaysia, has conducted a review and found that these 24 bridges are being upgraded and are existing JMLB projects under KKW.
The projects are, firstly, upgrading a narrow bridge on Jalan Aur Duri, Kota Bharu, Kelantan. This project is related to the Kg. Pengkalan Kubu, Aur Duri Bridge Upgrading Project as the Honourable Member raised.
This project was approved in 2022 with a scope of work to upgrade a bridge 20 metres long with R1 specifications, with a total overall cost of RM4 million. The project commenced in January 2024 and is expected to be completed on 4 November 2025.
Secondly, upgrading a narrow bridge on Jalan Mulong, Limbat, Kampung Guntung, district of Kota Bharu, Kelantan. This project is related to the Kg. Lating bridge upgrading project as the Honourable Member raised. This project was approved in 2023 with a project scope involving the construction of a bridge 25 metres long and an access road 0.2 kilometres long, with JKR R2 standards, with a total overall cost of RM5.41 million.
This project only commenced on 21 October 2024 and is expected to be completed on 18 October 2026. Besides that, from the list of 24 bridges the Honourable Member raised, this ministry found that one bridge had been applied for by the Ministry of Works (KKR) under RP5 RMK-12 of 2025, which refers to the Kg. Panjang, Binjai bridge. The upgrading of the Kg. Panjang, Binjai bridge is within the scope of the project to upgrade road FT211 from Simpang Kubang Kerian to Simpang Binjai, Kota Bharu, Kelantan, which was applied for by KKR.
This ministry obtained information from KKR that this project is not in the list of approved projects for the 2025 Budget. Meanwhile, for the 21 bridges the Honourable Member raised, the ministry's review together with JKR found that these bridges are under the supervision of the Department of Irrigation and Drainage (JPS).
These bridges are not listed in the Kelantan state priority list for applications for building and upgrading projects in the previous Rolling Plan.
Therefore, the ministry recommends that the Honourable Member forward the list of the 21 bridges to the State Economic Planning Unit (UPEN) of Kelantan for consideration. If they meet the scope of the JMLB programme, these bridges can be included in the State Priority List for the purpose of new project applications to this ministry in the next Rolling Plan. Thank you, Mr Speaker.
Supplementary question, Honourable Member.
Thank you for the feedback, and I express my appreciation for the projects that are ongoing, while 21 others apparently still do not appear on the list. There are two issues. The first one is overlapping.
Sometimes we do not know whether these projects are under the Rural Development Department or JPS. It was just informed that these 21 are under JPS. We went to JPS, and JPS said this is a rural building. So I want to ask what mechanism there is to distinguish whether these bridges are under JPS or under KKW? That is my first question.
The second question is that usually these projects take a long time.
It takes two years, three years. Whereas these bridges are daily and critical routes for residents. I observe that the major problem of our delay is due to land acquisition. This is because land acquisition is included in the project scope. When it is included in the project scope and land acquisition is disrupted, the project will be delayed.
Imagine, when a bridge is delayed, it will cause extremely great congestion for residents. My question is, can the land acquisition mechanism be resolved earlier before awarding any project to contractors? So that it is not burdened on contractors earlier, because it falls under state jurisdiction, and the state and the Federal Government can cooperate so that we settle land acquisition first before we award projects to contractors. Thank you.
The Honourable Minister.
Okay, thank you, Honourable Member, for the supplementary question just now. The first one relates to the difference between bridges under JPS, KKW or KKR? For the Honourable Member's information, based on our review, these 24 bridges were previously implemented by JPS.
That means the agency that built these bridges earlier was under JPS, yes.
However, JPS does not have allocations for maintenance, there is no maintenance allocation and so on. That is why, as people say, the condition of the bridges is dilapidated. If there are any, based on applications from the state government or District Office, for safety reasons, for the safety of the residents concerned, to agencies. Including GPS, KKW or KKR.
For the Honourable Member's information, these rural bridges. For KKW, as long as the bridge is in a rural area, it is our bridge. That means we can enter the bridge concerned based on this allocation, depending on the allocation. We can [fund] how many bridges in rural areas, including these 24 bridges. But based on the allocation and also the state government's priority list.
If the state government UPEN sends that list to us, we will bid for allocation to the Ministry of Economy so that we can implement the upgrading or repair projects of the bridges concerned, yes.
The repair of these bridges can actually be sent to the Public Works Department. JKR will take into account whether the bridge is located on a road. That means the road is under JKR supervision. But our KKW is originally for rural areas. We consider that it can be included in the implementation of the Ministry of Rural and Regional Development.
For the Honourable Member's information also, so far, previously we did not have a special allocation for repairing or building new bridges under the Rural Development Department.
Since 2021 this coding has been established. That is why it is easy for us now to list the implementation of rural bridge projects, repairs or rebuilding. But based on the state government's application, based on the state government's application, and we also raise it to the Ministry of Economy.
If approved, only then will it be implemented.
That means, there is no great difference as to who actually owns the bridge in this rural area? If the road is related to JKR, the bridge is under JKR. But mostly our review with JKR, the road of the 24 bridges referred to was under JPS supervision previously. For the Honourable Member's information also, under the ministry, good work, these rural bridges can be carried out using social amenities allocation. But that is only for small repairs. However, replacement, widening and so on must use the rural bridge allocation.
The second question relates to the land acquisition just now. The second question relates to land acquisition. For the Honourable Member's information, land acquisition is actually one of the specifications in the project implementation process
in the project implementation process. Which is one of what people call the standard procedures we carry out at the project pre-planning stage.
For the Honourable Member's information, indeed this land acquisition is one of the main reasons for one of the delays in project implementation. Since this land is under the state government. However, recently, we have made a joint commitment with the state government, yes, together with the state government. So that roads to be planned, yes. That means the proposed road submitted to KKW already has alignment from the state government.
That means the project brief is clearer. The alignment, we request a clearer project briefing paper. The alignment is made clearer before what people call project approval. We have also actually negotiated with the state government. So that the required road projects or alignments. We need commitment from the state government, yes, to identify the alignment site and subsequently make payment before the project is started. So far, we have not received comprehensive feedback from any state.
Only recently we received approval, that is, agreement, from the Sarawak State Government. Our aim is to expedite project implementation. But this method is not yet comprehensive. Not all state governments have welcomed our proposal so far. However, land acquisition is still included in the project specifications at the pre-implementation stage. Thank you, Dato' Mr Speaker.
Thank you. Secretary.
The Honourable Member for the constituency of Jelebu.
Honourable Jelebu.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Issue of Road Construction in Jelebu Parliamentary ConstituencySpecial Chamber
Mr Speaker, I stand once again to bring up another matter relating to the Ministry of Rural and Regional Development (KKDW) in my Parliamentary constituency. I thank you, Mr Speaker, for giving me this opportunity.
The first project I wish to touch on with KKDW is the construction of a road from Kampung Putra to Kampung Baharu Sungai Lui, Parlimen Jelebu. I understand that the construction of this road has been included as one of the new projects listed under the Ministry of Rural and Regional Development with an estimated allocation of RM268.8 million.
However, from the feedback I received, it is said that this project has not been given priority and could not be implemented under the Fourth Rolling Plan, Twelfth Malaysia Plan, RP 4, RMK 15, due to insufficient allocation. I would like to take this opportunity in this Special Chamber to convey the voice of the people of Parlimen Jelebu and to offer some views on why this project should be given priority.
Mr Speaker, for the information of the Honourable Minister, this road is among the main roads connecting the district of Jelebu and also
Jempol, besides being one of the alternative routes for users who wish to head to the East Coast. This is part of the Jelebu Outer Ring Road, with permission.
With the population of Jelebu increasing day by day, coupled with users from outside, the traffic volume on this route is quite high, especially during weekends and festive seasons. For some areas along this route, the road condition is rather unsatisfactory and unsafe to travel because it is narrow, has sharp bends, and some parts of the road are damaged. The situation worsens during the rainy season because the road is flooded due to the Sungai Pertang, which is no longer able to accommodate the large flow of water during heavy rain.
Therefore, I am of the view that this road project needs to be expedited because it will reduce the Level of Services (LOS) of the existing road to a better level and provide comfort and safety to road users in Parlimen Jelebu in particular.
My great hope is that KKDW will consider that this road project be implemented urgently in the upcoming Rolling Plan. I would also like to take this opportunity to ask the Honourable Minister about the status of the project to build a road connecting Jalan Muka Sauk Petaseh (N62) with Simpang Durian, Jelebu, Negeri Sembilan. It is part of the Jelebu Outer Ring Road which is understood to be implemented by KKDW in the near future.
This new alignment project is very important because it will increase road connectivity access to Kuala Klawang and subsequently provide economic spillover to the infrastructure and social development of residents in the surrounding areas.
For the information of Mr Speaker, the Jelebu area is a transit route for the East Coast community as well as the community on the West Coast and the community in the South. I would like to inform the Honourable Minister that this Jelebu Outer Ring Road not only solves the problems of the community in Jelebu but also solves the problems of the community in Jempol and Kuala Pilah, including communities from the East Coast, Kelantan, Terengganu, and also the community in the constituency of the Deputy Minister of Works, namely Pontian, Johor and so on.
They do not take the existing route but take a shorter, bypass route through the Parlimen Jelebu area. Therefore, Mr Speaker, I would like to ask the Minister to provide an explanation that these two important roads can be included and also implemented at the latest in RP13. Thank you, Mr Speaker.
Honourable Member, does this involve from Kampung Putra, Simpang Durian, Simpang Pertang up to Pelangai?
Ya.
The existing road?
Yes. If the Honourable Member remembers, when the Honourable Member and I were backbenchers before, I championed the Jelebu Outer Ring Road. That means it does not bypass, Honourable Member. So,
the community, the Honourable Member's many relatives in Jelebu, in Pahang and so on will enjoy this development. The money is there, Honourable Member.
Actually the allocation is already there, but this matter of pulling back and forth, I do not understand. Please ask the Honourable Minister to explain. Thank you, Mr Speaker.
[Laughter]
Thank you, YB Jelebu, for the question. Mr Speaker, the Ministry of Rural and Regional Development (KKDW) notes and greatly appreciates the Honourable Member's concern regarding the need for comfortable and safe roads in the Parlimen Jelebu constituency.
For the Honourable Member's information, the ministry has received the Negeri Sembilan Development Priority List from the State Economic Planning Unit (UPEN) of Negeri Sembilan for the application of a road construction project from Simpang Durian to Sungai Lui, Jelebu, Negeri Sembilan under the Fifth Rolling Plan of the Twelfth Malaysia Plan 2025, Rural Roads Programme of the Ministry of Rural and Regional Development. The scope of the project applied for is the construction of a road 16 kilometres long to JKR R2 standards, with a total overall cost of RM268 million.
For the Honourable Member's information, our ministry is well aware of the importance of this road because it complements the Outer Ring Road proposed by Negeri Sembilan, especially the Honourable Member in this case, yes. However, the ministry has submitted the application for the project to the Ministry of Economy for consideration of approval under RP5 RMK-12 of 2025. Nevertheless, the project is not in the list of approved projects in the Budget for 2025 received by this ministry.
For the Honourable Member's information, we had proposed it as the first priority, but the project chosen, number two, was by the Ministry of Economy.
Accordingly, our ministry recommends that the Honourable Member re-submit the application for the project to UPEN Negeri Sembilan for consideration and inclusion in the Negeri Sembilan Development Priority List for the purpose of new project applications to this ministry in the Thirteenth Malaysia Plan. That means for 2026. We will submit it, but the selection criteria must also be on the state priority list.
Next, for the project to build a road connecting Jalan Muka Sauk Petaseh (N62) with Simpang Durian, Jelebu, Negeri Sembilan, this project has been approved by the Ministry of Economy under RP1 RMKe-12 of 2021 with a total overall cost of RM216 million. The scope of the project is the construction of a road 17 kilometres long with JKR R2 specifications including three bridges. This project is implemented by the public works department with an implementation method of design and build. This project was tendered by direct negotiation in July 2022 under the Economic Empowerment Programme for Credible Bumiputera Contractors (Jana Wibawa). However, the Ministry of Finance, through a letter dated 7 February 2023, decided to cancel the tender of the project implemented by direct negotiation which had not yet been finalised in its tender.
Following that, in order to expedite the implementation of the project, which has a major impact on the people, this project has been implemented through a selected open pre-qualification tender, in which the first stage of pre-qualification process has
was carried out by the ministry from 30 May 2023 to 19 Jun 2023. Meanwhile, the selected open prequalification tender invitation was issued by the Public Works Department (JKR) on 27 December 2023. However, this tender could not be finalised and it was decided that it be re-tendered in June 2024. The Honourable Member has been informed of the re-tender. Based on this decision, the project was re-tendered, with the invitation issued on 23 August 2024 and the tender closing date set as 1 November 2024. In this regard, the tender evaluation process for this project is being carried out by JKR.
Accordingly, the ministry expects the procurement process for this project to be completed and the main contractor is expected to be appointed in February 2025. This project is expected to be completed in 2028, with a construction period of 42 months. Thank you, Mr Speaker.
Dato' Yang di-Pertua, I have carefully considered the Minister's reply, but Dato' Yang di-Pertua, I would like to ask the Minister that Jelebu should not be made a second choice, with permission. Jelebu is progressing, Dato' Yang di-Pertua. Later I will close the Jelebu road with permission from the state government. People in Kelantan and Terengganu are all getting headaches, Dato' Yang di-Pertua.
But I would like to thank the Ministry of Rural and Regional Development (KKDW) because many projects have been completed at the parliamentary level in my constituency. However, what is important is what I said earlier, namely the road that involves the allocation that has been approved in RP4 of the Twelfth Malaysia Plan, the road from Kampung Putra to Sg. Lui that I mentioned earlier. Then, it was cancelled and suddenly disappeared. The budget was already there, but it suddenly disappeared, which is not fair, Dato' Yang di-Pertua. Can the ministry re-instate it? If we apply again, it has to go through the process again, and it can go through the usual process again, Dato' Yang di-Pertua. So, it will be placed on the list of who knows how many others.
I would like to ask the ministry, if possible, to help the people of Jelebu to re-instate, with permission, that application and include it in the Priority List for the RMKe-13. RP1. That means 2026. I take it that is confirmed, Honourable Minister, yes.
The second thing, Dato' Yang di-Pertua, if I may, I would like to ask the ministry whether it could list the five-year project list that will be implemented by KKDW, especially those involving this road network.
Dato' Yang di-Pertua, I am focusing on this situation because we are about to face development and change in development for the community, especially the rural community.
I hope that my voters are not left behind, and this is the legacy that I want to fight for and leave to my voters. Thank you.
Thank you to the Honourable Member for Jelebu for the supplementary question. Mr Speaker, for the information of the Honourable Member, the Project to Build a Road from Simpang Durian to Sungai Lui, Jelebu, Negeri Sembilan, which was not approved under RP5 of the Twelfth Malaysia Plan, will be re-included in the ministry's planning.
Its application will be re-submitted to the Ministry of Economy and this ministry under the application for RP1 of the Thirteenth Malaysia Plan. We will actually re-include it in 2026 in the First Rolling Plan. However, the Honourable Member is also requested to submit a proposal for this project to the State Economic Planning Unit (UPEN) so that it can be included in the state's priority list. So that it becomes
a state priority in the RP1 application for the Thirteenth Malaysia Plan next year, God willing, Honourable Member.
Apart from that, the road and bridge projects that have been approved in the Jelebu Parliament. The ministry, together with JKR Malaysia, is carrying out a study and preliminary work for the Project to Build a Road from Kampung Chennah, Jelebu, Negeri Sembilan to Kampung Janda Baik, Bentong, Pahang, as an extension of the Kampung Chennah to Kampung Esok, Jelebu, Negeri Sembilan Road Construction Project, Phases 1 and 2. This study was proposed and approved by the Ministry of Economy in 2022 under RP2 of the Thirteenth Malaysia Plan-1. This study was also proposed because this ministry has completed the alignment of the roads from Kampung Chennah to Kampung Esok, Jelebu, Negeri Sembilan, through two phases at a total cost of almost RM130 million.
Based on the assessment, less than 40 kilometres more is needed, yes, to connect the road alignment with Bentong, Pahang. So, the extension of this road is seen to have a very significant impact. Not only on the local economy but also on the connectivity between Negeri Sembilan and Pahang. At the same time, it can reduce the travel distance from the East Coast to the South of the Peninsula. The proposal for this study has been presented to both the Negeri Sembilan and Pahang state governments and has been agreed to be implemented. At present, JKR, as the implementing agency for this project, is in the process of appointing a consultant for the study of this project. The study is expected to start in June 2025 and the study report is expected to be available in June 2026.
Mr Speaker, apart from that, this project was never approved before, yes. The one mentioned earlier, the Sungai Lui to Sungai Durian Project in Jelebu, Negeri Sembilan, yes. For the information of the Honourable Member, this project has actually never been approved. But we have had people say it was a study. It was never approved before. It was first applied for under RP5 of the State Economic Planning Unit (UPEN) of Negeri Sembilan. Therefore, it does not arise that this project has been cancelled by KKW.
Indeed, in our planning we did not cancel the project because we have only applied for the allocation. Only it has not yet obtained what people call priority from the Ministry of Economy. This is because it chose the second priority. The possible costing of the second project is because the cost is more than RM200 million. The one approved is more than RM150 million, the other one. Since usually in the Fifth RMK Rolling Plan the allocation has really reached the ceiling. That is why this is possibly one of the reasons why the decision turned out that way. Thank you, Mr Speaker.
The Honourable Member for Kubang Kerian.
Please proceed, Honourable Member.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Urgent need to provide street lighting in village areas, state roads and main roads in Kubang KerianSpecial Chamber
Thank you, Mr Speaker, for giving me the opportunity to raise this question in this Special Chamber. I wish to raise the problem involving the safety and well-being of the people in the Kubang Kerian area, namely the absence of street lights on several main roads and critical village roads.
This issue was raised by residents in meetings and dialogues with them. They have expressed a concern. The issue is the safety of dark areas and areas exposed to several undesirable incidents. This situation endangers road users because they are exposed to the risk of accidents as well as the threat of criminal activities that may occur in dark areas. Such as snatch theft and so on.
Among the fairly critical roads that have been listed here are:
(i) Jalan Pasir Jelatang, the route from Simpang Tiga Seribong to Simpang Empat Kiasatina (Pasir Hor);
(ii) Jalan Lebuhraya Pasir Mas-Salor. This road is the main alternative road to Kota Bharu from Bandar Pasir Tumboh;
(iii) Jalan Kg. Pulau Raja in Mukim Pulau;
(iv) The road to Sekolah Menengah Kebangsaan Kubang Kerian in Mukim Wakaf Stan. It is the main school road involving the route of schoolchildren;
(v) Jalan Kampung Wakaf Tanjung from Jalan Kampung Sarah to Mukim Chepa;
(vi) Jalan Kampung Machang Limbat and Jalan Kampung Berhala Lima in Mukim Pohon Menseta;
(vii) Jalan Kampung Stan, Kampung Bunut Susu and Kampung Bunut Satut, Beta in Mukim Beta;
(viii) Jalan Kampung Selor, Jalan Kampung Belimbing Limbat and Jalan Kampung Dalam Puyuh in Mukim Selor;
(ix) Jalan Kampung Gaung, Jalan Kampung Beta Hilir, Kampung Belukar to Kampung Mesa in Mukim Beta Hilir;
(x) Jalan Kampung Surau Pendek Dalam in Mukim Gaung Pendek; and
(xi) Jalan Kampung Likong in Mukim Seribong.
This view concerns matters of public interest and safety. This road is a main road, yes, not a village road or a rural road, in an area with very heavy road users. I seek feedback from the ministry. Thank you.
The Honourable Minister, please reply.
I patiently waited here for an hour. But while watching what was happening in the outside world. [Laughter] Dato' Dr. Yang di-Pertua, thank you, Honourable Member for Kubang Kerian. This ministry takes great care and will address the issue of road safety, particularly on Federal Roads throughout the country.
Through the Road Safety Infrastructure Upgrading Programme and the Special Allocation of the Ministry of Finance (Kementerian Kewangan) for 2023, the scope of installing street lights was implemented at locations where accidents occurred or where there is a risk of accidents due to dark roads. For this scope, accident-prone locations or locations at risk, such as at bends and bridges, as well as areas with accidents, will be identified and the installation of street lights will be carried out locally and on a small scale, not for the purpose of lighting along the entire route.
In 2023, a total of RM15.03 million was spent on installing street lights at 106 selected locations on Federal Roads throughout Malaysia. In 2023, a total of eight locations on Federal Roads in the State of Kelantan were fitted with street lights at a total cost of RM1.3 million. Meanwhile, for 2024, a total of 20 Federal Road locations in the State of Kelantan are being fitted with street lights under this programme at a total cost of RM1.8 million. The street light installation work is expected to be completed at the end of this month, end of November 2024.
Of the 11 roads raised by the Honourable Member, only two are Federal Roads that fall under the responsibility and supervision of the Ministry of Works (Kementerian Kerja Raya). The Federal Roads in question are:
(i) Jalan Kampung Surau Pendek Dalam in Mukim Gaung Pendek, located on Jalan Wakaf Che Yeh-Salor-Pasir Mas (FT130). FT means Federal Trunk; and
(ii) Jalan Lebuhraya Pasir Mas-Salor, located on Jalan Pasir Mas Salor (FT207).
akibat jalan gelap. Bagi skop ini, kawasan kerap kemalangan atau berisiko seperti di selekoh dan jambatan serta kawasan yang mempunyai kemalangan akan dikenal pasti dan pemasangan lampu jalan dibuat secara setempat dan berskala kecil bukan bagi tujuan pencahayaan di sepanjang laluan.
Pada tahun 2023, sejumlah RM15.03 juta telah dibelanjakan untuk pemasangan lampu jalan di 106 lokasi terpilih di Jalan Persekutuan di seluruh Malaysia. Pada tahun 2023, sebanyak lapan lokasi di Jalan Persekutuan Negeri Kelantan telah dipasang lampu jalan dengan kos berjumlah RM1.3 juta. Manakala bagi tahun 2024, sebanyak 20 lokasi Jalan Persekutuan di negeri Kelantan sedang dalam pemasangan lampu jalan di bawah program ini dengan kos keseluruhan berjumlah RM1.8 juta. Kerja pemasangan lampu jalan dijangka siap pada hujung bulan ini hujung November 2024.
Daripada 11 jalan yang dibangkitkan oleh Yang Berhormat, hanya dua sahaja merupakan Jalan Persekutuan yang terletak di bawah tanggungjawab dan seliaan Kementerian Kerja Raya. Jalan Persekutuan yang dimaksudkan adalah:
(i) Jalan Kampung Surau Pendek di Dalam di Mukim Gaung Pendek yang terletak di Jalan Wakaf Che Yeh-Salor-Pasir Mas (FT130). FT itu Federal Trunk; dan
(ii) Jalan Lebuhraya Pasir Mas-Salor yang terletak di Jalan Pasir Mas Salor (FT207).
The ministry is pleased to inform that new street light installation at locations in the Kubang Kerian Parliament was completed in 2024. The total cost of implementing the programme was RM200,000.
The locations in question are located on Jalan Wakaf Che Yeh - Salor - Pasir Mas, FT130, Section 5 as raised by the Honourable Member and Jalan Kota Bharu - Gua Musang, FT8, Section 378.
However, the ministry takes note of the Honourable Member's proposal regarding the installation of street lights on Jalan Pasir Mas - Salor (FT207) and will consider installing street lights on safety grounds under the Road Safety Infrastructure Upgrading Programme. Meanwhile, the results of the Ministry of Works' review found that six roads raised by the Honourable Member are Municipal Roads under the supervision and maintenance of the Municipal Council, and three roads are State Roads under the supervision and maintenance of the state government. Therefore, the authority for implementing these projects lies under the jurisdiction of the Kelantan State Government.
The Municipal Roads in question are:
(i) Jalan Kg. Pulau Raja in Mukim Pulau;
(ii) The road to SMK Kubang Kerian in Mukim Wakaf Stan;
(iii) Jalan Kg. Machang Limbat and Jalan Kg. Berhala Lima in Mukim Pohon Menseta;
(iv) Jalan Kg. Stan, Kg. Bunut Susu and Kg. Bunut Satut, Beta in Mukim Beta;
(v) Jalan Kg. Selor, Jalan Kg. Belimbing Limbat and Jalan Kg.
Dalam Puyuh; and
(vi) Jalan Kg. Likong in Mukim Seribong.
The State Roads in question are:
(i) Jalan Pasir Jelatang, the route from Simpang Tiga Seribong to Simpang Empat Kiasatina (Pasir Hor), namely Jalan Pasir Jelatang, D39. Honourable Member, if this FT is Federal Trunk. If this "D", it turns out it follows the car number plate.
If Johor, state road – "J". If Kelantan, "D" – D39 that road, yes;
(ii) Jalan Kg. Wakaf Tanjung and Jalan Kg. Sarah in Mukim Chepa, namely Jalan Badak Mati – Binjai, D5; and
(iii) Jalan Kg. Gaung, Jalan Kg. Beta Hilir, Kg. Belukar and Kg. Mesa in Mukim Beta Hilir, namely Jalan Simpang Tiga Pendek to Rumah Pam Kemubu. That is road D15.
The authority for installing street lights on state roads lies with the Kelantan State Government. Accordingly, the ministry recommends that this project proposal be escalated to the Kelantan State Government for further action.
Thank you.
Supplementary question, Honourable Member.
Thank you for the feedback that has been given and thank you for the several projects that have been approved. My questions are two. The first: we know that when this road is being built, the four-way junction automatically needs street lights, at bends, in dangerous areas. Can it be included directly in the construction scope so that we do not have to apply once again to install lights? When the road is being built, we say this is a critical area that needs lights. If possible, it should be included in the construction scope, which would be easier for residents, especially for users.
The second question is about this scope. We know that some of the allocations placed under the councils and the state government do not have large allocations. Therefore, I propose that, if possible, consideration be given to a mechanism for upgrading as proposed earlier, so that roads under this scope can also be maintained by JKR or KKW, yes, the Ministry of Rural Development. Thank you.
The Honourable Minister.
Dato' Dr. Yang di-Pertua, thank you, Honourable Member for Kubang Kerian. Old friend. Old friend. If we are friends, then let us just be friends.
[Laughter] Insya Allah. Amin. The supplementary question earlier stated that when building a road, it is directly included in the scope. Junctions, dangerous areas, bends and so on. I agree with what the Honourable Member said. The second concerned large allocations. I would like to share that state governments are given MARRIS allocations, and the road allocation for MARRIS is for the maintenance of State JKR roads. Also municipal roads and town roads, all of these. Everything can be maintained under the MARRIS allocation.
For the MARRIS allocation of the State of Kelantan, I would like to inform the Honourable Member that in 2023 it was RM74.33 million; in 2024, RM71.65 million; in 2025, our budget has not yet been passed. So, I cannot yet state how much the 2025 MARRIS allocation for the State of Kelantan is. This is received by the State JKR of Kelantan.
Based on this allocation from the Public Works Department (JKR) Kelantan under MARRIS, the breakdown is as follows. The first phase is allocated to road works, RM1 million. JKR electrical, RM500,000; resurfacing, RM2.6 million; STSB contract, Honourable Member. STSB here refers to Selenggara Timur. Selenggara Timur is the company appointed by the state government to carry out state road maintenance. They received RM36 million, Honourable Member.
So, in the second phase they will receive RM25 million. The total is RM40 plus RM31, which is RM71 million. This is for 2024. For 2025, we do not yet have the breakdown.
So, for maintenance, RM1 million was allocated for street light maintenance. In 2023, RM1 million; in 2024, under the MARRIS allocation of the Kelantan State Government. Too little, Honourable Member. But that is not for building new street lights. So, I would like to suggest to the Honourable Member, between us, that the Honourable Member write to the Ministry of Finance so that the state government's MARRIS allocation, for the states and also for towns and city councils, can be used to build new street lights and provide new street lights. At present MARRIS can only be used for maintenance of roads, bridges, culverts, drains, longkang, and slopes. These are MARRIS funds of tens of millions.
Second, the provision or relocation of utilities. Third, the maintenance, upkeep and conservation of trees on road shoulders, including activities to treat and fertilise the trees, but there is no provision for new street lights.
So, if the Honourable Member writes to the Ministry of Finance stating the allocation should be channelled to the Ministry of Works. Next year, within the range of RM5.5 billion in MARRIS allocations that we will send to the states, but it would be excellent if that allocation could be used to build new street lights.
I once attended the National Finance Council meeting chaired by the previous Prime Minister, not the current Prime Minister. That time it was Pekan.
Those present were the Menteri Besar. I myself was then Deputy Minister of Finance. I said the MARRIS allocation should not only be for the states and for town roads. It should also, to some extent, be usable for village roads and roads in housing estates. Approved! Honourable Member, my suggestion was approved.
Recently, we also amended one thing, namely that state governments may use MARRIS allocations to purchase Bailey bridges. This means the directive has changed. There have been improvements. The Honourable Member may write, and I will also help so that the MARRIS allocation can be used for street lights.
Cameron Highlands also wants street lights. If we are, hopefully, Cameron Highlands is becoming more – it has many roads in that village, all kinds of roads.
If possible, it should be well lit, not only in the tourist area of Cameron. The area is large, Honourable Member. My constituency is also large, and I have not received many new street lights. Sometimes we only get RM100,000 a year. If the street lights are solar street lights, one unit costs RM10,000 including all the systems. If it is RM100,000, that is only 10 units. Ten units are not enough. So, if the MARRIS allocation can be used for that. Thank you.
Alright. Honourable Members, with that, the Special Chamber session for today is concluded. The Special Chamber today is adjourned until Tuesday, 12 November 2024 at 2.30 p.m.