Dewan Rakyat · 18 November 2026
15th Parliament, session 5, meeting 3 · not final · 616 turns · 51,693 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Sitting]
Oral QuestionsQuestions
I invite Dato' Sri Dr. Wee Jeck Seng, Tanjung Piai.
Thank you, Madam Speaker. My question is number 1.
1. Dato' Sri Dr. Wee Jeck Seng [Tanjung Piai] asks the Minister of Digital to state what is the actual economic value generated for Malaysia from the growth of data centres in terms of employment, high-skilled salaries, tax and the use of local vendors, compared with the announced investment value.
Thank you, Madam Speaker, and thank you to my friend, the Honourable Member for Tanjung Piai. For the information of the Honourable Member for Tanjung Piai, the data centre industry is a model-intensive sector and also requires large initial investment, particularly for procuring cabling or cyber, electrical equipment, cooling systems as well as energy supply infrastructure. Most of this equipment is imported, while capital expenditure is realised in stages throughout the project's development period. Therefore, the announced investment value cannot be directly compared with the actual amount of expenditure. The creation of job opportunities or added value to the local economy at a certain point in time. As of October 2026, Honourable Member, a total of 117 data centre projects
have been recorded in Malaysia. For the first half of 2026 alone, approved investment in the public data centre and cloud computing segment amounted to RM95.8 billion. Meanwhile, under the Data Centre Task Force (DCTF), which is co-chaired by the Ministry of Digital and the Ministry of Investment, Trade and Industry (MITI), a total of 27 projects with an estimated investment value of RM225.97 billion have been approved as of October this year. In terms of job creation, up to the second quarter of 2026, projects under the DCTF are expected to generate a total of 4,053 job opportunities, including 3,523 high-skilled positions in electrical and mechanical engineering, cyber networks and security, and data centre operations and maintenance. Apart from direct job opportunities, data centre development also creates indirect job opportunities in the construction, engineering and support services sectors, although the number of direct workers in data centres is in reality lower compared with sectors such as manufacturing, which offer more specialised, high-skilled and value-added jobs. The Bank Negara Malaysia report entitled, "From Bytes to Bucks: The Economics of Data Centres in Malaysia", with permission, for the third quarter of 2025 shows that entry-level positions in this industry offer salaries of around RM3,000 to RM7,000 a month, while senior positions offer between RM10,000 and RM30,000 a month. This rate is higher compared with the median monthly salary of Malaysians, which was RM2,793 in 2024. In terms of tax revenue contribution to the government, some data centre projects enjoy approved investment incentives. Therefore, the direct corporate income tax contribution is expected to increase gradually, step by step, after the incentive period ends. However, data centre development and operation activities also contribute to government revenue through other sources, including sales tax, service tax, assessment tax to local authorities, as well as licensed revenue from the use and supply of utilities. The Government— Honourable Member, emphasises that Malaysia's aspiration is not merely to be a location for data centre development, but to ensure this investment becomes a catalyst for the development of the national Artificial Intelligence (AI) ecosystem
in line with the AI Nation 2030 aspiration. The government's priority is to ensure that such investment translates into high-skilled job opportunities, increased participation of local companies and technology transfer, as well as the achievement of sustainable economic value for our country. Thank you.
Tanjung Piai.
Thank you, Honourable Deputy Minister. Supplementary question. What specific mechanisms does the government have, including through the minimum requirement of 30 per cent local content, to ensure that the rapid growth of data centres in the Northern Zone, such as Sedenak and Iskandar Puteri, also brings spillover into the supply chain, talent development and business opportunities to neighbouring districts such as Pontian, including the Tanjung Piai Parliamentary constituency? And to what extent are data centre operators required to provide knowledge transfer programmes in industrial training and professional certification to the local workforce, and what targets have been set through this initiative? That is all, thank you.
Thank you, Honourable Member for Tanjung Piai. For the information of the Honourable Member for Tanjung Piai, the government always pays attention to the need to ensure that investment in the data centre industry also contributes to talent and local expertise development, in addition to generating investment and job opportunities for our people.
At present, through the mechanism of the Data Centre Task Force (DCTF), the government has set a minimum target of 30 per cent local content for new data centre projects approved under the DCTF. These companies cover engineering, maintenance, network and technology solution services. MIDA, Honourable Member, also monitors and ensures compliance with this requirement through implementation reports submitted by companies every six months, Honourable Member. Thus, MIDA is an agency for monitoring. And at the same time, data centre operators are encouraged to implement local supplier development programmes to strengthen the capabilities of the domestic industry and to promote technology transfer...
[Bangun]
In line with the said target, Honourable Member, the government also places emphasis on human capital development through strategic collaboration with data centre operators, industry players and training institutions. This approach aims, Honourable Member, to expand industrial training opportunities, knowledge transfer and relevant professional certification in line with the actual needs of the industry, as well as exploration to increase the participation and mastery of the local workforce and also infrastructure. For Tanjung Piai, Honourable Member, we are not, this— we will collaborate with those areas in Johor Bahru.
Kapar.
Thank you, Deputy Speaker. Minister, YTL Power International Berhad has just signed a strategic joint venture in late October 2026 to develop a 1,623-acre industrial park at Bukit Kerayong, Kapar, which is expected to become their main data centre campus in the Klang Valley. Kapar has an estimated population of 330,600 people according to DOSM 2025 and faces various infrastructure constraints, including overcrowded schools, recurring floods, road damage and pressure on the drainage system. My question is, has the government carried out a cumulative impact assessment to ensure that the development of this data centre does not: firstly, worsen the flood problem and increase the risk of water overflow due to land use change. It is currently flooding— affecting the residents' clean water supply through the high water usage for data centre cooling systems, causing— thirdly, causing competition over electricity consumption between data centres and domestic needs and the existing industries— there is already an industrial zone. And adding to the burden on road infrastructure, drainage and public facilities that are already under pressure. Does the government have any assurance that the development of this data centre will not cause the residents of Kapar to bear the social and environmental costs, while the economic benefits and investment are enjoyed by other parties? Thank you.
Thank you, Honourable Member. Our country, the nation of Malaysia, is advancing towards 2030, Honourable Member. So, we, we hope and also— and the government through this Data Centre Task Force, Honourable
Member, for every application— development of data centres in terms of sufficiency and supply of electricity and water, before approval, Honourable Member, with joint clarification, provides utilities and the relevant technical agencies. For electricity supply, the assessment takes into account system capacity and capability and also contribution to infrastructure readiness at the project location, and energy efficiency is also assessed through the indicator, Honourable Member, namely power usage effectiveness (PUE), alongside encouraging the use of renewable energy and more energy-efficient technology. Honourable Member, I believe the government is aware, Honourable Member, and is always sensitive to the very encouraging development of data centres today, and I believe, Honourable Member, we will continue to strive because our country is advancing, and we continue the expansion of data centres as a spillover and for the economic development of our country.
I invite Dr. Siti Mastura binti Muhammad, Kepala Batas.
In the name of Allah, the Most Gracious, the Most Merciful. Thank you, Madam Speaker. My question is number 2.
2. Dr. Siti Mastura binti Muhammad [Kepala Batas] asks the Minister of Agriculture and Food Security to state: (i) to what extent the new fishing licence registration mechanism provides room for young fishermen to enter the fisheries sector; and (ii) whether the current licensing policy and mechanism have met the needs of the new generation of fishermen to facilitate the approval process without compromising the sustainability of fisheries resources.
Please, Honourable Minister.
Mr Speaker, the government always strives to provide opportunities for the young to venture into the fisheries sector through a controlled licensing mechanism, taking into account the need to generate income and the sustainability of fisheries resources.
In Budget 2027, announced on 9 October 2026, the government agreed to increase the number of Special Boat Licence (LSK) holders from 17,000 to 20,000 fishermen with an allocation of RM30 million. To implement this initiative, the Ministry of Agriculture and Food Security, through the Department of Fisheries Malaysia, will carry out an LSK regularisation programme nationwide. This programme aims to ensure that licences are filled by genuine fishermen who actually carry out fishing activities as their main source of income, including young fishermen who meet the prescribed eligibility criteria. In terms of licensing policy, the issuance of new Fishing Vessel Licences for Zones A, B and C has been frozen since 1982 due to coastal fisheries resources and the existing vessel capacity having reached an optimal level. Licensing management is implemented in line with the Fisheries Act 1985 and the licensing regulations in force to discourage an increase in fishing capacity that could compromise resource sustainability. The mechanism for new fishermen to enter through LSK for Zone A is implemented by filling licence vacancies identified through the regularisation programme, including the cancellation of licences that have been inactive for three consecutive years. Through this mechanism, eligible applications, including young fishermen, may be considered for licences subject to the prescribed conditions and procedures. Apart from capture fisheries, the government encourages young fishermen to venture into aquaculture through the Fisheries Economic Transformation Programme through National Aquaculture, TEMAN-AKUA. This programme provides training, financial assistance and technology-based equipment to support income generation, subject to the eligibility conditions of the programme. Thank you.
Kepala Batas.
Thank you, Minister, for the answer given just now. So, we see that coastal communities, that is the sea, are not merely a source of income, but also a family economic heritage. As mentioned by the Minister just now regarding special licence holders and the routes provided, will the ministry be prepared to reform the licensing system, including reviewing inactive licences, and will there be a quota consisting of 17,000 to
20,000, special routes, special licences for young fishermen so that they do not compete with other fishermen? Secondly, this— for the second supplementary question, if possible, please provide a written answer if there is no data. What is the percentage of active national fishermen aged under 40, and what is the ministry's target to ensure that many young fishermen emerge within the next five years, together with the training or the National Aquaculture proposal mentioned just now?
Kepala Batas does not have many fishermen now. If there are any, they are around Bagan Ajam. However, fishermen's issues, especially coastal fishermen, always have problems that we resolve from time to time. Since I entered Parliament from 1990, questions about coastal fishermen have always arisen every session...
[Bangun]
And solutions are implemented from time to time according to what— through discussions— with fishermen's associations and the government and so on. Currently, several incentives have been issued by the government, namely what was mentioned in the expenditure just now, so that young fishermen venture into this, not as part-time, but seriously, and we also try to get them involved in downstream activities, that is, we look at if we get a lot of fish, what to do afterwards, including doing... [Inaudible] And so on, like advanced fishermen, we always provide guidance to these coastal fishermen. And indeed, for young people who want to venture into the fisheries field, our ministry has allocations and also motivational courses that can be given to them. Okay, that is my initial answer. Thank you.
Sekijang.
Thank you, Madam Speaker. My question concerns a sector of the Honourable Minister's that we rarely talk about, namely the inland fishermen sector. So, inland fishermen, yes. In my own area, Honourable Minister, the number of inland fishermen registered in Segamat District is around 237 people. So, these people, recently or several years ago during the construction of the RTB or flood mitigation plan, have caused their fishing activities to be affected. And in Sekijang, Segamat, it is famous for baung fish and giant freshwater prawns. And there is another species, Honourable Minister,
which is also quite famous in Sekijang, Segamat, namely ketutu fish, Honourable Minister. So, ketutu fish is expensive, Honourable Minister. One kilogram can reach RM75 up to RM200 per kilogram...
Soalan.
So, the question— so, what plans or what can the ministry do to help these inland fishermen who are affected by development activities such as the RTB, even though the RTB is also very important for controlling floods. Thank you.
Indeed, in the Honourable Member's area, it is well known for fish found in rivers, including as mentioned earlier, giant freshwater prawns, ketutu fish and so on. I myself, when I go to Sarawak, I will go to Sibu. There, at its big market, ketutu fish is available. The price is around RM20 to RM30, but at Pasar Selayang it may reach RM90. This ketutu fish is indeed a type similar to haruan, but some people call it hantu fish, some call it ubi fish. That fish. Indeed, Chinese people are very fond of eating this ketutu fish for making soup and so on. So, these inland fishermen, we hope the Honourable Member can write a letter to me and we will look at the specific needs there in detail because these inland fishermen also have allocations from our ministry. That is why we— and we are also working to release fish fry into the waters, into those waters, and we also give an allowance of RM250 to inland fishermen so that they too are involved, because inland fishermen now, God willing, are becoming a more prestigious livelihood because previously people did not eat much of this, what Jerlun, inland fish. Now inland fish has become expensive and popular, especially when there are high-grade fish such as ampura and so on. So now, the popularity of inland fish has indeed become a choice. Therefore, the Honourable Member's views earlier, we will give special attention because indeed I know that area, to eat baung fish, to eat giant freshwater prawns, everything has to go to the area of our Parliamentary Member there. Thank you.
I am waiting for the Honourable Minister to come.
I invite Dato' Haji Shamshulkahar bin Mohd Deli, Jempol.
Thank you, Madam Speaker. Jempol's question number 3.
3. Dato' Haji Shamshulkahar bin Mohd Deli [Jempol] asks the Minister of Higher Education to state the ministry's mechanism to ensure that students from B40 families who receive offers to higher education institutions are not left behind merely because they cannot afford the registration fee or initial entry costs, including immediate solutions through assistance and deferment of payment.
Please, Honourable Deputy Minister of Higher Education, to answer.
Mr Speaker, I request that question number 3 today be answered together with question number 9 by the Honourable Member for Merbok on Tuesday, 24 November, as it touches on the same issue.
Silakan.
Thank you. The government is aware that the financial challenges involving cost of living faced by higher education institution (IPT) students, especially among students from B40 families throughout their studies at these higher education institutions, generally cover tuition fees, accommodation, food and beverages, as well as transportation. Therefore, in addressing this challenge, the Ministry of Higher Education has already provided various assistance and initiatives based on these needs. Among them, firstly, assistance for tuition fees including the advance loan money of RM1,500 by PTPTN for eligible B40 students before they register at public universities or polytechnics. Secondly, which began this year, the PTPTN Biasiswa Anak eKasih, namely PTPTN loans are given in the form of scholarships to poor and hardcore poor students who are registered in the eKasih database and are pursuing full-time diploma or bachelor's degree studies at IPTA, whose loans are approved from 1 January 2026. Then, the SULUNG Student Development Programme, which provides opportunities and education financing to first-generation B40 families whose family members have not yet pursued bachelor's degree studies at public universities.
And fourthly, there are also various forms of financial assistance, including the Community College Student Financial Assistance (BKPKK) for certificate-level students at community colleges, the Foundation Financial Assistance (BKA) for foundation-level students at 13 public universities and TVET foundation programmes at 10 selected polytechnics, as well as the B40 TVET Student Donation (Derma Siswa B40 TVET) for diploma and bachelor's degree students in the TVET field. Secondly, in terms of accommodation, various initiatives have been implemented. Among them, a total of 15 residential college construction projects have been completed through the public-private partnership (PPP) method, with a total capacity of up to 45,000 students from 2021 to 2025. As for the way forward, during the RMK13 period, the Government also intends to develop five new residential colleges at public universities through the same method, which is expected to provide accommodation capacity of up to 21,000 students. As a continuation of all these efforts, in 2027, the ministry will be allocated RM800 million for the replacement, upgrading and rehabilitation of worn-out infrastructure and equipment at public institutions of higher learning (IPTA), including in hostels or residential colleges. In addition, the ministry is also collaborating with Government-Linked Investment Companies (GLIC) to meet the needs of student hostels and residential colleges, namely, among others, the construction of the University of Malaya Student Residence Phase 1, which is expected to be completed in 2031, thereby benefiting 10,000 students, and an investment allocation of RM750 million by KWAP for the development of the Fiesta Kampus Project at six selected universities. And next, for food and beverage costs. At our institutions of higher learning now, the Ministry of Higher Education (KPT) has already implemented the Dapur Siswa or Dapur Siswa MADANI initiative, which is the provision of free meals twice a day using the kitchen facilities and raw materials provided at residential colleges in public universities. This initiative supports the zero hunger aspiration and fosters a culture of volunteerism and a spirit of togetherness in the campus community. And fourthly, lastly, in terms of transportation, KPT collaborates with the Ministry of Transport Malaysia (MOT) through the FLYsiswa initiative by providing subsidies for the purchase of airline tickets in the form of a credit shell valued at RM400. This initiative provides flexibility to students for domestic routes between Peninsular Malaysia, Sabah, Sarawak and the Federal Territory of Labuan
especially for travelling home during festive seasons or semester breaks. This is specifically targeted at students of IPT who are Malaysian citizens, with priority given to B40 and M40 students. The Government has also announced an increase in the amount of this assistance to RM500 in the initiative for 2027. Apart from all the initiatives mentioned, we will also continue to strengthen...
Ringkaskan jawapan.
...mechanisms to ease the cost of education and the cost of living for students, especially for students from low-income families. Thank you.
Jempol.
Thank you, the Honourable Deputy Minister, for the answer. So, congratulations to the Ministry of Higher Education for the various initiatives or programmes to help students from the B40 group. So in this regard, considering— supplementary question, Jempol, considering that the rising cost of living is increasingly burdening students, what is the ministry's assessment of the adequacy of the PTPTN financing rate and the existing financial assistance for that group. Thank you.
Mr Speaker, to answer this question, the Cabinet meeting on 18 October 2023 did in fact approve an increase in the Cost of Living Allowance (ESH) for existing and new students under the Ministry of Higher Education Sponsorship Programme. This is under the sponsorship, effective from 1 January 2024, and the implementation of this ESH increase involves additional financial implications of RM32 million a year starting from 2024, and this increase reflects our concern and our commitment. However, for example, allowances or PTPTN loans, from time to time we need to look at the flexibility of the forms of loans that can be given to our students based on PTPTN collections and also the policies from time to time. So, attention will continue to be given beyond PTPTN; we must also ensure that these allowances or forms of assistance can be disbursed through different avenues or different mechanisms.
Jerlun.
Honourable Minister, Mr Speaker. I refer to a newspaper report, Utusan Malaysia, 18 September 2026, entitled, "Fisherman's child does not have enough money, may fail to register at UiTM." It reported the concern of poor B40 students who cannot enter IPT due to financial problems. In this regard, the Government established PTPTN as an alternative to overcome financial problems, but it is in the form of a loan, not a scholarship as the Honourable Minister mentioned just now. So apart from the PTPTN loan, in our country there are government agencies such as the Zakat Board in every state, Baitulmal, foundations and GLCs that allocate financial assistance to these B40 students...
Soalan.
My supplementary question is, is KPT prepared to consider a mechanism called B40 Education Assistance Sehenti or one-stop centre (OSC) that combines all the agencies I have mentioned, so that students facing financial problems before entering IPT can receive assistance before registering, without them having to withdraw at the last minute from entering university. Regarding the success of poor students, I will take the example of two questions...
Ringkaskan soalan.
In France and Germany. In France, they provide scholarships to students who are categorised as poor. In Germany, for public university students in bachelor's and master's programmes, they are given assistance every semester according to achievement— CGPA, if we are talking about Malaysia. So, by taking the examples of France and Germany...
Yang Berhormat...
...Which is able to implement targeted educational assistance based on the income of poor families, what are the obstacles for KPT in introducing the same approach as France and Germany in Malaysia, especially for poor students who have academic qualifications but do not have money. That is all, thank you.
Summarise the answer. The question has already taken 2 minutes.
[Dewan ketawa]
The question from Jerlun, two examples from France and Germany. My answer, I will give three examples. The first, we are actually aware that the first, if we mention students from France, if it is mentioned— Jerlun, we have already started. That is what we call the Anak eKasih Scholarship through PTPTN, because PTPTN remains the easiest route to access for students who receive offers to university. That is why every poor student from B40 families and also those registered under eKasih, they simply register as students, receive an offer, PTPTN accepts them first because we will automatically absorb all their debts. This means they get free education, and we have already allocated RM290 million for this purpose. So, that has already been implemented, alhamdulillah. The second, regarding students who excel through PGNK, we do have examples of this, where until 2026, a total of RM1.82 billion has been spent, covering more than 168,000 students who have been given this education. This means they are given scholarships. Actually, it is not a scholarship, we write off their debts. And the third, another most recent example for 2027 is the Income Contingent Repayment Plan. This, among other things, is also implemented in the UK, where students are not given or not asked to repay until reaching a salary level that is more suitable, and that is what we are working on so that students who have not yet or graduates who have not yet earned a salary exceeding RM2,500, they do not need to pay their PTPTN. Instead, they only need to ensure that they focus their attention on advancing their careers. That is what the MADANI Government is implementing today. Thank you.
I invite Kapten Dato' Dr. Zulkafperi bin Hanapi, Tanjong Karang.
Thank you, Mr Speaker. Tanjong Karang question number 4.
4. Kapten Dato' Dr. Zulkafperi bin Hanapi (B) [Tanjong Karang] asks the Minister of Agriculture and Food Security to state the plans to expand the agriculture-based TVET programme on smart farming, automation, drones and artificial intelligence in order to produce a new generation of agropreneurs and attract more youth to venture into the agri-food sector.
Thank you, Mr Speaker, and Tanjong Karang, the questioner. The Ministry of Agriculture and Food Security always encourages the involvement of young talent to strengthen the agricultural sector. The level of national food security is being transformed through a progressive agri-food sector modernisation agenda guided by the National Agri-Food Policy and the National Food Security Policy. In producing more young farmers in Malaysia, the plans and initiatives of KPKM have several items. The first, providing structured training programmes under the Agriculture Technical and Vocational Education and Training Programme (TVET Pertanian). The structured programme for a two-year study period aims to encourage the young generation to get involved in the agri-food field as skilled workers and entrepreneurs with skills and competitiveness. The TVET Pertanian Programme is recognised by the Department of Skills Development (JPK) of the Ministry of Human Resources, and TVET Pertanian offers 10 fields under the Malaysian Skills Certificate and five fields under the Malaysian Skills Diploma. The TVET Pertanian curriculum is constantly improved by taking into account current needs, including the use of modern technology involving automation, internet technology, things, drones and artificial intelligence in the learning syllabus. The curriculum is developed through joint efforts with industry, academia and relevant departments and agencies under KPKM to ensure the curriculum is aligned with industry needs. In 2006, under the National Agri-Food Empowerment Programme, KPKM allocated RM350,000 to organise 14 courses under talent empowerment for 983 participants comprising TVET Pertanian trainees and the Veterans Affairs Corporation (PERHEBAT), which sent many participants. KPKM also expands training and skills for TVET trainees by offering the Drone Operation Skills Certification Programme covering aspects of
safety, operation and compliance with aviation regulations. This initiative can open career opportunities for youth as agricultural drone operators and provide agro-technology services— may I finish?
Banyak lagi?
Not much, it won't go past 12 o'clock...
Okey, boleh.
KPKM is deeply committed to expanding and strengthening the TVET programme based on smart farming, mechanisation, automation, drone technology, IoT and AI to produce a new generation. The key issue here is that attitude and perseverance must be present in participants, young agropreneurs who are competitive, innovative and technologically savvy. This year, a total of 40 value-added courses targeting 1,482 participants have been implemented for TVET agriculture trainees. There is much more. I have written, I will take the last part, but what it means is we have initiated the Agropreneur Next Gen grant, we have allocated RM30,000 and if there is progress we will increase it to RM50,000.
This is being worked on and those involved— these agricultural areas, please take note and we, this budget has been prepared and we must strive to ensure this budget reaches the young people who want to get involved in this agricultural field. Thank you.
Tanjong Karang.
Thank you, Mr Chairman. Thank you, the Honourable Minister, for the lengthy explanation. However, Honourable Minister, we do not want to produce many agriculture TVET graduates who end up not working in the field they studied. So, does the ministry set specific targets to ensure that agriculture TVET participants obtain employment or succeed in building their own businesses after completing training? And is the ministry prepared to establish cooperation with agro-technology companies to provide employment and direct training opportunities? Thank you.
Thank you. How many graduates have obtained employment? I will give that figure in writing. Indeed, there has been an increase. Graduates from agricultural institutes and also agricultural courses are indeed taken up for work.
Agricultural graduates are indeed taken up for work. And we are also in dialogue and engagement with companies. Among them, a research company in Selayang that recruits many TVET graduates. I will give the name of that company to the Honourable Member. Many of them take in graduates to get involved. And if possible, with the RM30,000 allocation at this early stage, if possible we want them to get involved themselves in fields such as fisheries and so on, we can help, especially if they want to farm fish using biofloc. I have tried it at my home, I am about to harvest the sixth batch of tilapia fish using this biofloc method. It can be undertaken by these young graduates. So we always provide, but they must know the opportunities and must be close to all the officers at district and state levels so that the allocation can be taken up by participants, trainees at agricultural institutes or these agricultural courses. Thank you.
Betong.
Thank you, Madam Speaker. I focus on the context of post-training continuity and the Agropreneur Grant. Madam Speaker, attracting youth to enter agricultural TVET institutions is only the first step. So, while our real challenge there, as explained by the Honourable Minister earlier, is to ensure they remain in the industry after completing their studies without dropping out due to constraints of access to land and capital. So, I would like to ask the Honourable Minister, what is the percentage, if there is data on TVET graduates, perhaps already asked earlier, by my colleague earlier. Smart farming under PLKPK that has successfully been absorbed into the entrepreneurship ecosystem through the PAN programme, namely the Agropreneur NextGen Programme mentioned by the Minister earlier, and what mechanism is provided to match idle land or government land to ensure this training investment will yield tangible food production results? Thank you.
The percentage of graduates who continue to get jobs, I will give that in writing so that I can give an accurate figure, but I guarantee there has been an increase. The increase, and those who do not continue in the agricultural field are only few. Nowadays, young people are increasingly getting involved in agriculture on a full-time basis
especially in the pineapple industry. We see now that some are earning handsome incomes. In Sabah, it is those involved in onions. Although it is not really a government initiative, they started it. Then the government only came to help. This initiative by young people is happening now because confidence has arisen that providing food is a job that can generate fairly good income. It is only guidance from the government, assistance, grants and so on. If there are areas in the Honourable Member's constituency, please send them and we can look at the situation, allocations, for example, at the state level in Sarawak and so on. We will look at all forms of assistance that we can give, but the inclination of young people towards agriculture has increased so much recently. Thank you.
I invite Tuan Mohamad Shafizan Haji Kepli, Batang Lupar.
Thank you, Madam Speaker. My question number 5.
5. Tuan Mohamad Shafizan Haji Kepli [Batang Lupar] asks the Prime Minister to state the timeline for implementing the proposal agreed at the recent meeting of the Malaysia Agreement 1963 Implementation Action Council (MTPMA63), particularly regarding the addition of Sabah and Sarawak Dewan Rakyat seats in a one-third ratio and establishing a formula for special grants to the State of Sarawak under Article 112D.
Thank you, the Honourable Member for Batang Lupar, for your concern on this issue. Madam Speaker, the MADANI Government has placed emphasis on the implementation of the Malaysia Agreement 1963 as a national narrative and it should not be a narrative of Sabah and Sarawak alone. This commitment has been followed by the enhancement of the official MA63 negotiation platform with the establishment of the Malaysia Agreement 1963 Implementation Action Council (MTPMA63) chaired by the Right Honourable Prime Minister and the Technical Committee under MTPMA63 chaired by the Right Honourable Deputy Prime Minister cum Minister of Energy Transition and Water Transformation.
Regarding the proposal to add seats to the Dewan Rakyat for Sabah and Sarawak, the Meeting of the Malaysia Agreement 1963 Implementation Action Council (MTPMA63) on 11 September 2026 agreed in principle to increase the representation ratio of both states in the Dewan Rakyat, in line with the original spirit of the formation of Malaysia. Following that decision, the implementation actions will be carried out in stages as follows. The first is the stage of coordinating and finalising the mechanism. The Sabah and Sarawak Affairs Division, Prime Minister's Department, began engagement with the Election Commission (SPR) on 22 September 2026. A proposal to establish a Special Committee under the MTPMA63 Technical Committee was also submitted. The second is the proposal stage, sorry. The legislative stage: the proposal to add seats requires an amendment to Article 46 of the Federal Constitution, which must receive the support of at least two-thirds of Members of the Dewan Rakyat. And the third, at the implementation stage after the constitutional amendment is finalised, the SPR will carry out the Electoral Constituency Redelineation Process in accordance with Article 113 and the Thirteenth Schedule of the Federal Constitution. However, the government has not yet set a specific date for tabling the constitutional amendment or for implementing the addition of seats, because the matter still requires examination from the legal, technical and electoral delineation aspects, as well as consultation with stakeholders. Regarding the formula for the special grant to the state of Sarawak under Article 112D of the Federal Constitution, the government has noted the proposal of the Sarawak State Government to establish a calculation formula that is clearer, consistent and sustainable for determining the rate of the special grant in the future. As an interim measure, the Federal Government has announced an increase in the special grant to the state of Sarawak from RM600 million to RM1.5 billion, effective in 2026. However, this rate is an interim solution and not a final solution to the long-term formula negotiations. At present, the proposed formula is still under negotiation between the Federal Government and the Sarawak State Government. The outcome
of the negotiations will be examined by the Ministry of Finance and brought to the MTPMA63 Technical Committee for consideration and further action. Accordingly, the government will continue to strengthen coordination through MTPMA63 by determining the follow-up actions of the lead agencies and the legislative requirements for each matter. The implementation timeline for both matters will be finalised once the agreement mechanism between the Federal Government and the Sarawak State Government is reached, subject to the provisions of the Federal Constitution and the legal processes in force. Thank you.
Batang Lupar.
Thank you, Madam Speaker, thank you, the Honourable Minister. Since the Malaysia Agreement 1963 was signed, it still has not been fully fulfilled. I hope that under the leadership of the Most Honourable Tambun, this matter can be concluded in the very near future. My question to the Honourable Minister concerns the proposal to add seats to the Dewan Rakyat for Sabah and Sarawak in order to achieve a ratio of one-third of the total Parliamentary seats.
Does the government intend to introduce a legal mechanism, as the Minister mentioned just now, namely a constitutional amendment, and will this constitutional amendment not be able to be maintained in the future in order to preserve this one-third ratio? And if this happens, it means that if seats are added in Peninsular Malaysia, it will also increase the number of seats for Sabah and Sarawak. My second point concerns the special grant under 112D in Sarawak. Has agreement been reached on the proposal that 20 per cent of the revenue generated by the state of Sarawak be returned to the state of Sarawak? And I hope...
Ringkaskan soalan.
If this constitutional amendment is implemented in the future, all Members of the House will support restoring the rights of Sabah and Sarawak that have been eroded before this. Thank you, Madam Speaker. Thank you, the Honourable Minister.
Thank you, the Honourable Batang Lupar. As I said earlier, what is most important now is the agreement in principle and in policy that there will be an increase in the number of seats in Sabah and Sarawak. That is an important achievement that has taken place under this MADANI Government. Until now, there has been no definitive decision to increase the number of seats in Borneo. As I told you earlier, one of the follow-up actions is that we will establish a special committee to examine this matter, and I have discussed with the Honourable Minister of Law and Institutional Reform to ensure that this matter will be finalised and tabled in this august House for joint approval. So, I ask all our friends here to ensure that this increase can be realised. Because we must distinguish between Sabah and Sarawak. Why do we demand this right? This is based on Article 9, Annex A of the Malaysia Bill MA63, which states that the seats for Members allocated in the Dewan Rakyat were — at that time — a total of 159 persons, consisting of 104 Members from the states of the Federation of Malaya, 16 Members from Sabah, 24 Members from Sarawak and 15 Members from Singapore. The total for Members— this is the important part, Madam Speaker. The total for Members from Sabah, Sarawak and Singapore formed one-third of the overall composition of the total number of Members of the Dewan Rakyat at that time. So, the meaning is that specifically under the MA63 Agreement, that one-third must come from Sabah, Sarawak and Singapore. Singapore has left us, but Sabah and Sarawak remain. So, we must ensure the right representation in Parliament, in this House. And as for the 20 per cent, it will be discussed in detail between the state governments and the Federal Government. That requires joint agreement. Okay, thank you.
Kangar.
Thank you, Mr Speaker. I was very impressed by my friends from Sabah and Sarawak who have always fought for MA63 in every respect. It is an agreement that has not been fully honoured by the Federal Government...
Soalan.
So, the rights of Sabah and Sarawak must be respected, because they have formed the concept of Malaysia since 1963...
Soalan.
...Together with Singapore. Nevertheless, the responsibility for development for all Malaysians must also be preserved. My question is, supposing, supposing Sabah and Sarawak obtain an increase in political representation power and financial rights, would the government agree that one-third representation is not merely a political figure, but also has implications for the balance of power in the national decision-making process. Second question...
Only one question.
...What mechanism will be used to ensure that the addition of seats does not only benefit certain political parties, but truly strengthens the voting power of the people of Sabah and Sarawak? Thank you.
Thank you, the Honourable Kangar, for the supplementary question. As I said earlier, we must understand the spirit of MA63, and we must understand that without MA63, Malaysia would not have been formed. So, what we ask, Madam Speaker, is that we want the voice of Borneo, the voice of Sabah and Sarawak, to be sufficiently heard in this august House. That is what— because we want that whatever policy decisions are made in this Parliament, the voice of Borneo will be taken into account. That is what is important. Because, if we do not look at this matter now, we also do not know what will happen in the future. With current thinking, I look at it from a political perspective, my own observation. If this extreme thinking occurs, I am afraid that in the future, the voice of Borneo will not even be heard, and will not even be cared for in this House. So, we need the right sizing, the right representation for the people of Sabah and Sarawak to have a voice.
Mr Speaker...
That is, that is...
I am not allowing a supplementary question.
Okay. So, I think that is it, and from another angle, both of these states are large. Indeed, in terms of allocation, we need more. That is what we need: the number of Parliamentary seats, at the very least, with added funds to serve these rather large areas. And this must also be understood by our friends in Peninsular Malaysia. So, we hope that when we table this in this august House to amend the Constitution, Article 46, I ask that two-thirds of these Members of Parliament support this motion, God willing. Thank you. [Applause]
I invite Dato' Sri Ikmal Hisham bin Abdul Aziz, Tanah Merah.
Thank you, Deputy Speaker, my question is number 6.
6. Dato' Sri Ikmal Hisham bin Abdul Aziz [Tanah Merah] asks the Minister of Defence to state the Ministry's strategic plan to strengthen the concept of "kebersamaan" (jointness) under the Joint Force Headquarters (MK AB) in order to reduce redundancy of functions/roles between the Malaysian Army, the Royal Malaysian Navy and the Royal Malaysian Air Force, thereby achieving expenditure savings without compromising national sovereignty.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings of wellbeing. Madam Speaker, thank you to the Honourable Tanah Merah for the question raised. The concept of kebersamaan or jointness is the core of the development of the Malaysian Armed Forces (ATM) towards the formation of a future force that is integrated, agile and focused, in line with the Defence White Paper. The Joint Force Headquarters (MK AB) functions as the operational-level command that integrates the capabilities of the Malaysian Army (TDM), the Royal Malaysian Navy (TLDM) and also the Royal Malaysian Air Force (TUDM) through the concept of assigned forces, namely troops, assets and capabilities from all three services placed under the command and operational control of the Joint Force Headquarters according to mission requirements. The implementation of jointness focuses on command and control of interoperability, joint training, optimising assets and resources, and joint operational planning, including the sharing of information and
situational awareness. At present, the Joint Force Headquarters implements the concept of jointness for Op PASIR and also Op PERISAI TIMUR. The objective is clear, namely to consolidate the strength of all three services as a more integrated joint capability and to contribute to more sustainable expenditure. As an affirmation, the concept of jointness does not mean eliminating the specific functions or capabilities of TDM, TLDM and also TUDM. Each service will continue to develop and maintain its core capabilities. Meanwhile, the Joint Force Headquarters ensures that these capabilities are integrated at the operational level. That is all the answer.
Tanah Merah.
Thank you, Deputy MENHAN. I ask for clarification from the Honourable Deputy MENHAN: does the Ministry or the Malaysian Armed Forces plan to place permanent combat formations, at either battalion or brigade level, directly under the operational command of the Commander of the Joint Force, or will the role of the Joint Force Headquarters be limited only to the conduct of exercises and ad hoc joint operations, such as humanitarian assistance involving the Air Force, land and sea? The reason I ask this is because, taking into account the rank of the Commander of the Joint Force currently provided, which is a three-star rank or Lieutenant General, a very high military senior officer rank.
If the role of the Joint Force Headquarters is only as a coordinator, a rank of two stars, namely Major General only, would suffice for this Commander of the Joint Force, given that the UNIFIL mission in Lebanon and the IMT in Mindanao have ended. The workload is now decreasing. So, I suggest that the time has come for a specific formation under the direct command of the Commander of the Joint Force, whether at battalion or brigade level. Do you agree, Honourable Deputy MENHAN? Thank you.
[Bangun]
[Bangun]
Thank you for the supplementary question. As I informed earlier, the Joint Force Headquarters, when we want to
implement our duties and responsibilities, we follow our mission requirements and also our operational requirements. That is the most basic thing we must look at. That is why, as Tanah Merah mentioned earlier, our international missions are indeed under the Joint Force, but we must also remember that through the operations and missions we conduct domestically, such as Op PASIR and so on. Because we know that control through the Joint Force is how we integrate our three branches or domains of defence. And I think in the future, we will also have a new domain, namely our cyber domain. That is why the way we act is based on our missions. And as was said earlier, how we can empower the capabilities of our three defence domains depends on our needs from time to time. For now, we are focusing a lot on our East Coast, and especially if we look at the island areas in Sabah and the like, including in the waters of Sabah and also in Sarawak. So, these are among our focuses. As for the future, how we want to further complete our integration depends on our operational needs. That is all.
Kuala Pilah.
Thank you, Honourable Speaker. Thank you, Deputy Minister. Following on from the answer just now regarding kebersamaan (jointness). Kuala Pilah would like to ask: what control mechanism is implemented by the Ministry to ensure that the procurement of strategic assets, spare parts and maintenance, repair and overhaul (MRO) contracts between the three service branches of the ATM are coordinated centrally under the concept of jointness just mentioned? At the same time, to prevent budget leakage and delays in asset readiness. And what is the strategy for rebranding the career campaign and improving entry eligibility requirements to attract the interest of young people across various races to join the ATM? Especially in overcoming the problem of failure in physical screening and filling the need for high technical expertise of modern military. Thank you.
Thank you, the Honourable Kuala Pilah, for the question raised. If we look at when we develop the Joint Force
there are indeed many factors we focus on, especially in the context of how we can make more sustainable expenditure. One of these aspects is also related to maintenance. And if we look at maintenance alongside it, we can also make savings in training and operations. As for maintenance, we concentrate largely on the Joint Force Headquarters only. As for maintenance in the other domains, it is still coordinated by either TDM, TLDM or TUDM. As for the matter of participation in the Ministry of Defence or the Malaysian Armed Forces from various races, we are always striving to ensure that the people of our nation have the awareness to become one of the members of national defence regardless of race. Because we know that the responsibility of safeguarding the sovereignty and security of our nation is the responsibility of everyone. That is all.
I invite Tuan Kesavan a/l Subramaniam, Sungai Siput.
Thank you, Madam Speaker. My question is number 7.
7. Tuan Kesavan a/l Subramaniam [Sungai Siput] asks the Minister of Science, Technology and Innovation to state what efforts are currently being undertaken to develop technology for the management of groundwater resources in Malaysia, particularly in remote areas or areas with limited drinking water sources.
Thank you, Mr Speaker. Thank you, the Honourable Sungai Siput. For the information of this august House, the role of the Ministry of Science, Technology and Innovation (MOSTI) in the management of groundwater resources is as the lead developer of research technology and scientific expertise. The provision of water supply to the people, including the development and operation of permanent water supply systems, remains the responsibility of the relevant ministries, agencies and state governments. Accordingly, MOSTI contributes by providing technology, data and expertise that can help implementing agencies identify, plan and manage groundwater resources more accurately, quickly and cost-effectively.
Mr Speaker, one of the main efforts is the utilisation of space technology by the Malaysian Space Agency (MYSA), particularly through remote sensing satellite imagery and geographic information systems (GIS). This technology is used to identify the potential of groundwater resources, including in remote areas and areas facing constraints on clean water supply. This initiative began in 2012 through collaboration between MYSA and the Department of Minerals and Geoscience Malaysia (JMG) in the Muar River Basin. The project produced a map of groundwater potential zones in hard rock areas, with location determination 33 per cent faster. And cost savings of up to 50 per cent for development costs, whereby tube well drilling is guided by the potential map and field resistivity surveys, compared with conventional wildcat drilling. To prove the effectiveness of this method in the field, a total of 11 tube well systems have been developed as pilot projects and now benefit approximately 8,200 residents in 11 settlement areas in Johor, Negeri Sembilan, Selangor, Kedah, Pahang and Sabah. To ensure that the water supplied is safe to drink, water quality is monitored regularly by MYSA in collaboration with the Chemistry Department Malaysia (KIMIA) for laboratory analysis and the Ministry of Health Malaysia (KKM) for sampling methods and drinking water standards. Mr Speaker, in line with the National Space Policy 2030 (DAN 2030) and the National Space Action Plan 2030 (NSE2030), MYSA is currently implementing a project to determine groundwater recharge zones in the Sungai Langat field in collaboration with the National Hydraulic Research Institute of Malaysia (NAHRIM). The project, implemented since 2022, will produce a recharge zone map to identify areas that need to be protected so that groundwater resources remain sustainable. Apart from space technology, the Ministry of Science, Technology and Innovation (MOSTI), through the Nuclear Malaysia Agency (Nuclear Malaysia), also collaborates with the National Hydraulic Research Institute of Malaysia (NAHRIM) by providing facilities and expertise in the use of nuclear technology and related technologies. This technology covers three main techniques: first, the electrical resistivity technique to identify the location of aquifers, geological structures, contamination, and the intrusion of salt water into aquifers. Second, the isotope technique to determine the origin and movement of groundwater, estimate its age, and the rate at which aquifers are recharged.
Third, the perjuri technique to trace water flow paths and identify leaks in dams and hydrological structures. The use of this technology supports research, monitoring and management of water resources in a sustainable manner, and enhances the safety of water-related infrastructure. Mr Speaker, MOSTI, through its agencies, will continue to strengthen collaboration with JNG, NAHRIM, state governments and relevant agencies so that this technology can be utilised optimally, particularly for rural communities and areas facing water supply constraints. Thank you.
Sungai Siput.
Thank you, the Honourable Deputy Minister, for the answer just now. My supplementary question is, what steps and strategies have been implemented by MOSTI in promoting and expanding the use of space-based technology to identify the potential of groundwater resources and support the sustainable management of water resources by government agencies and stakeholders? That is all, thank you.
Thank you, Mr Speaker, thank you for the supplementary question of the Honourable Member for Sungai Siput. The Ministry of Science, Technology and Innovation (MOSTI), through the space agency MYSA, is constantly intensifying efforts to promote the use of space technology to support the exploration, mapping and management of groundwater resources in a more efficient, systematic and sustainable manner. These efforts aim to expand the adoption of this technology by government agencies, industry players, educational institutions, and stakeholders involved in groundwater resource management, as well as to raise public awareness and knowledge of the potential applications of space technology in the resource management sector.
To achieve this objective, MYSA implements various promotion and technology transfer approaches, including through the organisation of seminars, technical workshops and knowledge-sharing sessions with government agencies and relevant stakeholders. In addition, outreach programmes are carried out continuously for the public and students to increase understanding, awareness and interest in the use of space technology in everyday life, including for the purposes of exploration and conservation of water resources.
As a result of the promotion efforts and strategic collaboration between these agencies, MYSA has established collaboration with the Department of Agriculture Malaysia (DOA) in the development of an online application system that utilises space technology to help manage water resources for the agricultural sector more efficiently, orderly and systematically. The development of this system is one of the examples of successful adoption of space technology in supporting the operational needs of government agencies, particularly in improving the capacity for monitoring, planning and management of water resources to support the productivity of the agricultural sector. Thank you.
Padang Besar.
Thank you to Madam Speaker. Congratulations also to MYSA, NAHRIM and MOSTI themselves for their continuous efforts. Okay, we are aware that Kelantan is the state that relies most on groundwater resources—underground—to meet the water supply needs of the people, because the use of water from rivers, treatment is relatively, relatively higher compared with underground. For the information of the Honourable Deputy Minister, for about four years now Kelantan has had groundwater treatment technology through the innovation of local talent via the Teluk Mesira Plant, which uses NR cavitation technology without the use of chemicals, with an operating cost reported to be less than 10 sen per cubic metre of water. My question is, does the government intend to accelerate the comprehensive exploration and development of groundwater resources, including adapting local technology such as NR cavitation as a water supply source, a more cost-effective and sustainable alternative especially for rural areas, interior areas and states at risk of water supply disruption due to pollution of river sources? That is all, thank you.
Thank you, Mr Speaker. Thank you to the Honourable Member for Padang Besar for the supplementary question. Kelantan is indeed one of the states that has relied on groundwater for the longest time, including for public supply in Kota Bharu. This proves that groundwater can be a viable source of supply if it is managed well.
The role of MOSTI is to ensure that the technology required is available and that local innovation is given space to be proven and commercialised. From the exploration aspect, MOSTI has assisted MYSA in using satellites to map groundwater potential. This method also shortened the determination of energy locations to approximately six months and saved costs by up to 50 per cent. Nuclear Malaysia uses isotope techniques to determine the rate at which aquifers are recharged. This is important so that water abstraction does not exceed the capacity of the aquifer and remains sustainable in the long term. Regarding local innovation such as what the Honourable Member mentioned just now, NR cavitation, MOSTI welcomes the innovation of local talent in this water treatment technology. In order to be adopted more widely, a technology must undergo independent performance verification against the drinking water standards of the Ministry of Health and obtain technical approval from the water services authority. In this regard, MOSTI can provide support through existing channels such as research and commercialisation funds, testing, and the National Technology and Innovation Sandbox (NTIS) platform to test technologies in real environments. Technology owners are encouraged to submit applications through these channels. Mr Speaker, our principle is clear. Local technology that is proven safe and cost-effective deserves to be given the opportunity. At the same time, scientific data must be used so that groundwater resources are utilised sustainably. MOSTI is ready to collaborate with PETRA, the Kelantan State Government and other states towards that end. Thank you.
Terima kasih.
I invite Dr. Ahmad Fakhruddin bin Fakhrurazi, Kuala Kedah.
Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Mr Chairman, my question is number 8.
8. Dr. Ahmad Fakhruddin bin Fakhrurazi [Kuala Kedah] asks the Prime Minister to state what comprehensive measures have been taken by Tabung Haji (TH) in balancing domestic and global investments to ensure a competitive distribution of the hibah value amid the current uncertainties in the world economic market.
Thank you, the Honourable Member for Kuala Kedah. Madam Yang di-
Pertua, Tabung Haji was established to help Muslims in our country save little by little for the purpose of performing the haji pilgrimage. In line with the mandate enshrined in the wakalah contract between Tabung Haji and depositors, as well as the requirements in the Tabung Haji Act 1995, Tabung Haji must carry out these investments in a Syariah-compliant manner to grow depositors' savings sustainably. To grow these depositors' funds sustainably, Tabung Haji will make annual profit distributions made based on the provisions in the Act I mentioned earlier and after the payment of zakat on behalf of depositors. Tabung Haji's investment strategy is implemented based on a strategic asset allocation framework, or also known as, with respect, strategic asset allocation (SAA), and an appropriate risk tolerance level. This measure aims to ensure that the management of depositors' savings is managed prudently and more safely even though there is a full guarantee from the government. At present, for the information of all Honourable Members, Tabung Haji allocates 54 per cent of its allocation to fixed-income instruments, 29 per cent to equities, 12 per cent to real estate and the remainder in the cash market. In terms of geographical exposure, nearly 90 per cent of Tabung Haji's investment assets are invested in the domestic market, while the remaining 10 per cent is invested in the global market. Madam Speaker, although the SAA allows greater exposure to the global market, Tabung Haji's investment activities must take into account and comply with the foreign exchange guidelines prescribed by Bank Negara Malaysia, just like other government-linked investment companies (GLICs). For the information of Honourable Members as well, the SAA framework is reviewed every three years to ensure that investment strategy and risk management continue to take into account current changes in the economic and capital market environment, including taking into account uncertainties in this capital market. Tabung Haji practises good governance and prudent investment through a staged process of scrutiny and approval. Every investment proposal will be scrutinised by various parties, including firstly, the management. Secondly, the investment panel; thirdly, the Board, before being submitted to the Minister in the Prime Minister's Department (Religious Affairs) before making
consideration and approval, subject to the limits of authority and the approval requirements in force. The emphasis on management, risk monitoring and Syariah compliance applied in every investment is very much taken into account and taken seriously by Tabung Haji. Alhamdulillah, as a result of the measures taken, Tabung Haji has succeeded in elevating its financial performance and its capacity to distribute profits in a more sustainable and consistent manner. The profit distribution rate increased from 1.25 per cent in 2018 to 3.5 per cent in 2025, which is the highest rate of return in a period of eight years. This is supported by an increase in the value of Tabung Haji's investment assets (AUM) from RM75.8 billion to RM96.4 billion in 2025, which is an increase of RM20.6 billion or a rise of 27 per cent. Alhamdulillah, overall, Tabung Haji has distributed profits totalling RM50 billion from 1996 until 2025. That is all, thank you.
Kuala Kedah.
Thank you, Mr Speaker. Thank you to the Honourable Deputy Minister who has already given positive figures regarding the development of Tabung Haji. My supplementary question is, based on the preliminary estimate of the Department of Statistics Malaysia, the national economy grew 5.3 per cent for the third quarter of 2026. I would like to ask, what is the target composition of Tabung Haji's domestic and international investments for the next 3 to 5 years, and what benchmarks are used to ensure that this balance truly increases returns to depositors without jeopardising the safety of their capital? That is all, thank you.
Thank you to the Honourable Member for Kuala Kedah. We greatly appreciate the Honourable Member's concern about investment issues that will have a direct impact on depositors' savings. For the information of the Honourable Members, as I mentioned earlier, yes, we have a structure before we carry out any investment. Investments must be based on the SAA that I mentioned earlier, namely strategic asset allocation, and
any planning or proposal to initiate any investment will be examined very seriously. So, in this way, God willing, Tabung Haji's depositors' funds will always be looked after and ensured that they can be given benefits, although, as I mentioned earlier, the government provides a full guarantee on the returns to depositors who place their deposits in Tabung Haji. That is all, thank you.
Balik Pulau.
Thank you, Madam Speaker. I have studied the answer from the Deputy Minister regarding Tabung Haji's performance. And I would also like to state here that the performance compared with other funds such as KWSP and PNB are all able to provide high returns. Whereas Tabung Haji still records a lower profit distribution rate...
Soalan.
My question is, does this show that Tabung Haji's investment performance is less efficient compared with these institutions? And I also have a question, whether Tabung Haji needs to recruit talent like EPF does. It has an Investment and Strategic Analysis Panel that is truly professional in looking at incoming and upcoming investments, and does not rely solely on the Board of Directors of Tabung Haji making decisions according to their own preferences. Instead, there is a special panel, Chief and Investment Strategy, within Tabung Haji. That is all, thank you.
Thank you, the Honourable Member for Balik Pulau. Firstly, it is not appropriate to compare Tabung Haji apple-to-apple, with respect, with other institutions such as KWSP, PNB, KWAP or LTAT. This is because Tabung Haji is more suitably compared with bank accounts, namely CASA, with respect, current account, saving account, because they share similarities in terms of deposit and withdrawal facilities. For your information, other investment institutions have different mandates from Tabung Haji. For example, if today we put RM50 into Tabung Haji, tomorrow we can withdraw RM30. Okay. However, when compared with a CASA account, Tabung Haji provides returns that are
much higher. For example, 3.5 per cent for 2025 after zakat is paid, compared with less than one per cent for a bank CASA account. And we take seriously the proposal from the Honourable Member for Balik Pulau regarding the recruitment of talent and a special panel. God willing, Tabung Haji will study it and will always improve Tabung Haji's investment methods. That is all, thank you.
I invite Puan Isnaraissah Munirah binti Majilis @ Fakharudy, Kota Belud.
Thank you. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. My question is number 9.
9. Puan Isnaraissah Munirah Majilis [Kota Belud] asks the Minister of Housing and Local Government to state the position of the top 10 and bottom 10 local authorities (PBT) in the latest assessment of the Local Authority Star Rating System (SPB-PBT), as well as the ministry's readiness to pioneer a programme of technical expert advisory and knowledge transfer task forces together with the state government to strengthen the capacity of local PBT officers in Sabah.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. [Recites selawat] Mr Speaker, for the information of this august House, this ministry, through the Local Government Department (JKT), has finalised the results of the 2026 Local Authority Star Rating System assessment, which covers a fully online assessment of 154 PBT across the country, comprising 20 city councils, 42 municipal councils and 92 district councils. Based on the overall marks of the 2026 PBT Star Rating System assessment, each PBT is classified according to the categories I mentioned earlier, city councils, municipal councils and district councils. As the Honourable Member for Kota Belud has asked for the highest and lowest lists, the list will be long because it has three categories, city councils, municipal councils and district councils. I request, Mr Speaker, to provide the list in writing. Honourable Member? As for the question from the Honourable Member, whether the Ministry of Housing and Local Government (KPKT) is ready to pioneer a programme of technical expert advisory task forces and also knowledge transfer in PBT in Sabah.
Mr Speaker, the ministry remains fully committed and ready to establish close cooperation with the Sabah State Government, particularly through the Sabah Ministry of Local Government and Housing (KKTP) and the Office of the State Secretary, and through joint initiatives that we focus on in implementing a programme to strengthen the capacity of local authorities (PBT) and the capacity of PBT officers in Sabah, based on orderly coordination and strategic cooperation between the Ministry of Housing and Local Government (KPKT) and also KKTP Sabah. KPKT's commitment to strengthening PBTs in Sabah has the potential to be realised in a focused, targeted and structured manner through various platforms and special initiatives, among which the following are, targeted capacity-building workshops and also mentoring sessions for the Honourable Member, yes. Where in this 12th month, we will hold special mentoring sessions to help PBTs in Sabah improve the quality of urban service delivery holistically, especially in the aspects of development control, licensing, and customer management. Through the mentoring sessions later, KPKT technical experts will help PBTs draft service quality improvement action plans for the well-being of the people, which indirectly will also contribute to improving the star rating of PBTs at the Sabah state level. The second is the transfer of best practices, peer-to-peer knowledge transfer, where we are ready to pioneer a benchmarking mechanism by matching Sabah PBTs with outstanding PBTs that have received transformation awards. For example, Telupid District Council in Sabah has already received a transformation award, and also Kulai Municipal Council, Johor, and we place focus on the transfer of the best model, best practices. Both are about digital transformation, Mr Speaker. There are several applications that have already been adopted at KPKT level, such as OSC 3.0 Plus Online, the One-Stop Centre (OSC) PBTPay system, the ePBT 3.0 System and also the e-Profil System and also PBTK. All of these we can bring to Sabah to help PBTs there upgrade their services. Thank you, Mr Speaker.
Kota Belud.
Thank you for the answer from the Honourable Deputy Minister. Because a few years ago, I forgot his this. Indeed, if we look at most
those that are the lowest-ranked, actually most of them are in Sabah, and the Deputy Minister is also aware that in Sabah, its geography and its demography are quite vast and indeed pose high challenges. I just want to ask, to what extent are the geographic and demographic criteria of Sabah taken into account when we assess the star rating for PBTs, so that— because some areas, if they are industrial, perhaps the PBT there is fine. For example, perhaps the area is large, and internet access is also poor, yes. So, that will greatly affect the economic capacity of district councils. I also like the answer from the YB Deputy Minister just now regarding— perhaps this is a whole-of-government approach, cooperation with KPKT, and also the Ministry of Rural and Regional Development (KKDW). I hope perhaps it can be further expanded also to examples for...
Ringkaskan soalan.
...We ensure road projects, drainage systems and also digital coverage so that these small towns are not left behind due to financial constraints faced by the PBT itself. Thank you, Deputy Minister. [Dato' Sri Dr. Ramli bin Dato' Mohd Nor (Cameron Highlands)
Mr Speaker.
Silakan Menteri.
Mr Speaker, thank you. For the information of the Honourable Members, although this star rating system may use a set of standard indicators and benchmarks to maintain service quality benchmarks at the national level, the principle of fairness is still applied through segregating assessments by PBT category.
For example, Honourable Member, if at the city level— city. If at the municipal level— municipal. At the district level— district. As I mentioned just now, we have 92 districts.
Let me give an example, Honourable Member. Telupid District Council. When we assessed it in 2024, it was at position 87 out of 92 districts, but for this assessment, Telupid has surged tremendously. It is now at position 4 out of 92 districts. This means, if we look at the districts in Sabah, Sabah local authorities, there are 26 PBTs― one city; two municipalities; 23 districts. If the 23 districts in Sabah could take Telupid District Council as an example, from position 87, how wonderful that would be. And it is not difficult for Sabah to find examples, because Telupid District Council is in Sabah, in— if I am not mistaken, in the Beluran Parliamentary constituency. So, the others perhaps― Mr Speaker, my time is up― we can discuss outside later. Thank you.
Please proceed, Honourable Maran.
Thank you, Mr Speaker, Dato' Sri Dr. My question. If I am not mistaken, the average marks of SBB and PBT have dropped from 90.44 per cent in 2024 to 78.79 per cent in 2026. Does this decline reflect an actual deterioration in the quality of service to the people for ber― and from changes of power and indications of assessors? And what are the government's actions and efforts in tackling this problem? And if PBT performance is used as the basis for allocation considerations, then surely PBTs with low performance will continue to fall behind. What mechanisms is the government using to tackle this problem so that the performance of PBTs in our country continues to improve, regardless of whether they are in urban or rural areas? Thank you.
Silakan, Menteri.
Mr Speaker, the reason for the drop in marks for 2026 is not entirely due to a decline in service quality at the PBT level, but rather is the result of the shift in assessment method to impact- and outcome-oriented assessment, as well as issues of PBTs' understanding of the new indicator dictionary, and the condition of star downgrading for 25 PBTs that have received the Auditor General's Certificate with reprimand.
That is what I can mention. As for the others, Mr Speaker, as I have answered earlier. Thank you, Mr Speaker.
Thank you, Honourable Minister. Honourable Members, now the session for Question Time for Oral Answers has ended. [Question Time for Oral Answers session ended]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, "Under Standing Order 12(1), I humbly move that the sitting today shall not be adjourned until the debate and decision at the Committee Stage for the Ministry of Energy Transition and Water Transformation and the Ministry of Science, Technology and Innovation for the Supply Bill 2027 and the Development Expenditure Estimates 2027 have been completed, and after that the sitting shall be adjourned until 10 a.m. on Thursday, 19 November 2026." That is all. Thank you.
Are there any Honourable Members who support?
Dato' Sri Mr Speaker, I support.
Good, thank you. Honourable Members, now I put the question to the House for decision. The question is that the Motion as moved just now be agreed to.
[Motion moved for decision; and agreed to]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 CommitteeBill
The Order Paper was read to resume consideration of the "Supply Bill 2027 and Development Estimates 2027 in the Committee of the Whole House." [Ninth Day] [House in Committee] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
Before we continue the debate, Honourable Members, with sorrow and grief, I wish to announce to all Honourable Members that the father of the Honourable Tuan Haji Kamal bin Ashaari, Member of Parliament for Kuala Krau, has returned to the mercy of Allah (Rahmatullah) this morning. On behalf of the Members of this House and of Parliament as a whole, I would like to record condolences to the Honourable Tuan Haji Kamal bin Ashaari on the passing of his father. We pray that Allah SWT showers His mercy upon his soul and places him among the righteous and the faithful. Amin ya Rabbal alamin.
Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.33 [Schedule] – Head P.33 [Development Estimates 2027] –Bill
Let us return to the business of the House. Ministry of Energy Transition and Water Transformation. Head of Supply B.33 and Head of Development P.33 under the Ministry of Energy Transition and Water Transformation are open for debate. The list submitted by the Parliamentary administration comprises 31 persons. The Honourable Members who will debate will begin with the Honourable Member for Puchong, the Honourable Member for Machang, the Honourable Member for Balik Pulau, the Honourable Member for Kuala Nerus, the Honourable Member for Beaufort, the Honourable Member for Bukit
Gantang, the Honourable Member for Puncak Borneo, the Honourable Member for Kuala Kedah, the Honourable Member for Kota Belud, the Honourable Member for Lumut, the Honourable Member for Klang, the Honourable Member for Arau, the Honourable Member for Batu Pahat, the Honourable Member for Padang Serai, the Honourable Member for Kalabakan, the Honourable Member for Parit Buntar, the Honourable Member for Sipitang, the Honourable Member for Rompin, the Honourable Member for Batang Lupar, the Honourable Member for Kangar, the Honourable Member for Beruas, the Honourable Member for Setiu, the Honourable Member for Tuaran, the Honourable Member for Rasah, the Honourable Member for Pokok Sena, the Honourable Member for Wangsa Maju, the Honourable Member for Shah Alam, the Honourable Member for Kapar, the Honourable Member for Ampang, the Honourable Member for Merbok, the Honourable Member for Hulu Langat. Hereby, as the curtain-raiser, I invite the Honourable Member for Puchong to proceed.
Thank you, Dato' Pengerusi. Puchong refers to B.33 Item 020100 – Electricity Supply. I will focus these 5 minutes on the management of electricity supply in Peninsular Malaysia. Dato' Pengerusi, Puchong refers to a report citing records from the Grid System Operator (GSO) that on 8 June 2026, the grid's peak demand, maximum demand, in Peninsular Malaysia or Semenanjung Malaysia, had reached approximately 21 gigawatts, while the actual available generation, which is our capacity at that time with the scheduled maintenance of the Edra Melaka Power Plant, was only at 25 gigawatts. This means the effective reserve margin on that day was only around 13 per cent. Even if we take the Edra plant into account, I estimate that the reserve margin of electricity supply in Peninsular Malaysia now is at the level of 23 to 24 per cent. This is actually the lowest reserve margin figure in the country's 10-year, perhaps 15-year, history. So, my first question to the ministry is, what is the latest value of the reserve margin of electricity supply in Peninsular Malaysia? What worries me, Dato' Pengerusi, is the rapid development of data centres that demand such high electricity supply, while our supply capacity cannot catch up with the demand from data centres that will come online in the near future, especially new term. This is because there is a time gap between the construction of data centres and also power generation
plants. Data centres can be built within 12 to 24 months, one to two years.
Meanwhile, gas power plants will now take four to seven years, taking into account supply chain constraints. Dato' Pengerusi, there is a global supply crunch right now for gas power plant equipment. For the long term, we are actually facing a very large electrification wave in world history. In Malaysia, large-scale data centres already account for around 7 per cent of electricity consumption in Peninsular Malaysia, and this figure will surge by 30 per cent by 2035. At the same time, we have EVs, we have electrification of the public transport sector and also the energy transition of factories and entrepreneurs. Therefore, Puchong strongly supports the Energy Commission (ST) in establishing a separate electricity wholesale market (wholesale market), a separate wholesale market for large power users, including data centres, by 2029 to 2030. Congratulations and kudos to the Energy Commission. This is a very important and critical step, because we cannot spend money building large power plants to accommodate industry speculation, where they will have a very large demand, but if market dynamics decline or technology changes, then this demand will decrease, while the assets we have will be borne by consumers. Therefore, to have a separate wholesale market is a very, very important step. I also welcome the launch of the New Gen 25 and New Gen 26 tenders by ST recently to meet electricity supply needs for the short and medium term. However, Dato' Pengerusi, I have some proposals for ST to improve and to study. First of all, I think we should price electricity for data centres correctly even now. Not only in 2029 and 2030, with permission. I propose that ST directly remove the coal component from the base load calculation in setting the base tariff for these data centres. This step is very important so that ordinary people out there can enjoy the full benefit of the much cheaper coal generation cost
compared with gas and other generation. At the same time, it ensures the average base load price for domestic users remains controlled, but we price correctly for data centres so that they can study whether their business model will take it up and bring them profit, so that they can invest in Malaysia. If we price our electricity correctly now, we will lead to investment, not misinform investment, and I propose that ST think about it and study it, especially on coal pricing. Coal pricing should only benefit domestic users in Malaysia, with permission. Secondly, to recog— 2 more minutes, Dato' Pengerusi. Secondly, to address short-term supply issues, the short-term supply crunch. We will have a supply crunch until 2029, when the new power plants come online. ST cannot focus only on the generation aspect with New Gen 25, but must strengthen demand management or demand management. The government needs to establish policies to encourage large electricity users such as factories to lower their peak consumption, namely shaving the maximum demand. Therefore, Puchong proposes that ST sit together with the Ministry of Finance to study how we can provide incentives to further boost the use of battery energy storage systems. I have examined this matter. I found that although entrepreneurs who install BESS are eligible for GITA – Green Investment Tax Allowance, unfortunately leasing companies, BESS leasing companies, are not eligible for GITE – Green Income Tax Exemption. Yet we know that this leasing model is much more flexible and practical for factories that do not have a big budget to bring out an upfront model, namely CapEx. I want to remind ST. When I was Minister, when we wanted to increase the take-up rate for solar leasing, what we did was ensure there were leasing companies, and these leasing companies had investment income tax exemption, so that we encouraged more people to invest in becoming leasing companies for solar leasing. After that, the take-up rate did indeed increase. Therefore, we can use the same model. Finally, Dato' Pengerusi, because this ministry— the ministry that I once had the trust to bear— finally, I have a little reprimand
more. I would like to take this opportunity to urge the Energy Commission to republish the JPPPET report, namely the Electricity Supply and Tariff Planning and Implementation Committee (JPPPET), to the public. I have just noticed that the last JPPPET announced was in 2021. I still remember when I was Minister of Energy, we had decided that we would publish the JPPPET report. Why? This JPPPET holds two sessions every year to plan long-term how the electricity supply industry will supply electricity. This is very important so that industry players and industry users can always get updated information from the Energy Commission. Therefore, these are some of my proposals to the Energy Commission. Thank you, Dato' Pengerusi, for giving me enough time to finish my points.
Thank you, Honourable Member. Next, I invite the Honourable Member for Machang to proceed.
Thank you, Pengerusi. Item Heads 14200 – Structural Restoration and 20000 – Kelantan State Water Supply Plan. Pengerusi and the honourable House. I ask the ministry to examine river infrastructure issues in the Machang Parliamentary constituency, such as Sungai Bagan, Sungai Sat, Sungai Galang, Sungai Kweng Hitam, Sungai Pertak and so on, because shallowing has occurred which affects river flow and impacts the productivity of paddy farmers in Machang. I also ask the ministry to add allocation for repair works on riverbanks that have eroded. This is also a factor in the tendency of rivers to shift, and it is important to reduce flooding during the monsoon season that will arrive soon. And I also want to raise the issue involving, yes, we know Kelantan, Terengganu, Kedah. These are our states. Opposition states. States which the Honourable Minister of Agriculture also knows, that if they want to achieve their KPIs they must be helped. I am confident the Honourable Minister helps a great deal. Thank you. Only perhaps want to add more from the Right Honourable Deputy Prime Minister cum Minister of Energy and Water to help bring
...allocations to repair the old water channels could not be made in time. For example, in Machang there is a 671-hectare paddy scheme whose water reaches the fields through a system built in 1956, before independence. It has never been replaced, 70 years now. So, I feel the time has come for us to replace this pump house. Build one that makes it better so that we can raise the productivity of the farmers in the area. So, I request the Deputy Prime Minister to provide additional allocation to help the Ministry of Agriculture increase the productivity of our paddy farmers in Machang in particular and in Kelantan in general. Second, Honourable Chairman, Item 040000 – regarding MyPower. MyPower is, well, if you ask the government today, it is like NAPIO, the body that manages the planning for building our nuclear power generation. Mr Chairman and the esteemed House, I feel Malaysia is already late, very late. I have just returned from COP31 in Antalya, Turkey, where I presented Malaysia's and Members of Parliament's views at World Atomic Days, a conference involving nuclear. Turkiye will begin operating its first nuclear power generation next year, and they have been working on this since 2010. This is a big mega project. If we are determined to do it, as President Macron offered us yesterday, France— France will also want to cooperate with Malaysia. If Malaysia wants to be involved in projects in the nuclear field.
So we need to seriously increase the allocation for MyPOWER and involve people who are truly experts in the nuclear field. I see that this is not easy, because during the Pakatan Harapan era we cancelled the Malaysia Nuclear Power Corporation (MNPC). Yes, the Minister— formerly the Minister for Puchong, the Honourable Member for Puchong, former Minister, and at that time the Right Honourable Prime Minister Tun Dr Mahathir did not really like nuclear energy, but that is his view. I differ from Tun Mahathir on this matter. I hope Malaysia, under the leadership of Tambun, who has spoken many times, and the Right Honourable Deputy Prime Minister, who has also done so many times, and the Right Honourable Petra Jaya, who has already spoken on this matter, will... So, I feel the time has come, before we dissolve Parliament, to give a little more allocation to
MyPOWER and bring back our retired experts. The first batch of our nuclear experts, such as Tan Sri Dato' Ahmad Tajuddin Ali, former Executive Chairman of TNB, former Chairman of MNPC, Dato' Dr. Aizuddin Ahmad. These were all graduates of Imperial College, the first batch. Our problem before, Chairman, was that when Malaysia sent our first batch, they were already 70 years old, already retired. We also had PETRONAS at that time. So when there was PETRONAS, nuclear became just research. We did not take it seriously. Compare with Iran, Honourable Minister of Agriculture. Iran, why could Iran stand up to them? Because they have nuclear. They have nuclear expertise. Not to say nuclear weapons, no, but the expertise of Iran's nuclear scientists is extraordinary. Pakistan, perhaps Pakistan is not very rich, but it has nuclear. So, for Malaysia to be a sovereign, dignified nation, we need to value our nuclear talent and we need to build our first nuclear power plant. Start today. In the Budget, increase a little so that human resource planning and the human capital we want to bring in for the next 10 years are truly sufficient. Malaysia will soon become a net importer of oil and gas. We can no longer be nostalgic about PETRONAS. We need to change, and we need nuclear as a source of energy in our energy mix.
Machang, briefly, nuclear.
Okey boleh.
We already have those who have retired. What is Machang's view on starting instead with a new generation that is interested in and focused on nuclear, because this is something important for the country. What is Machang's view?
Yes, I agree with the Honourable Member for Hulu Terengganu. I have many friends who were former nuclear engineering students at UKM, but all of them are doing other work now. Selling books, selling food, dear. Talents— driving GRAB. So, we need to relocate, with permission, their talent back to this sector, because it requires long-term planning— more than 10 years to complete nuclear power generation. So I request the government to seriously strengthen the agenda, roadmap and blueprint for building our first nuclear power plant. We follow in the footsteps of Turkey, the footsteps of Iran, Pakistan and Bangladesh. Honourable Minister of Agriculture,
Bangladesh is also building nuclear with Russia. So, what is wrong with us doing it in Malaysia? It is not that we are unable. Insya-Allah, we can. Thank you, Chairman. [Applause]
Thank you, the Honourable Member for Machang. The Honourable Member for Balik Pulau is invited to speak.
Thank you, Chairman. Item 030000 – Water Management and Sewerage. I wish to raise questions concerning the efficiency of management of water resources and national utilities, especially in tackling the loss of treated water and the increase in demand from data centres. First, regarding efforts to reduce NRW, or non-revenue water, with permission. Based on data from the National Water Services Commission (SPAN), the national NRW rate in 2024 was still at 34.3 per cent, which is very high. This means that part of the treated water that has been processed and put into the distribution system does not reach consumers and does not generate revenue for water operators. Based on the federal expenditure estimates under Item 95000, namely the National NRW Programme, the government has allocated RM500 million. For 2027, this amount has already increased by RM150 million compared with 2026. In addition, the government is continuing Phase 2 of the NRW reduction programme, worth approximately RM2.5 billion, involving the replacement of around 1,978 kilometres of old critical pipes. So I see this increase in allocation as a commitment. However, efforts to reduce NRW do not necessarily depend on pipe replacement alone. We need to shift to a more holistic approach, namely prevention using technology and data-driven guidance. Among the approaches that can be strengthened are the use of acoustic sensors to detect leaks, water pressure monitoring systems, and data analysis to identify areas at risk of damage before leaks become more serious. In addition, distribution networks can be divided into metering zones, namely district metered areas (DMA), so that the volume of water entering an area can be monitored and compared with recorded consumption. For example, Air Selangor, in November 2026, implemented an automatic monitoring platform to track leakage trends across more than 2,000 district metered areas,
or district metered zones. This system combines data from various sources to identify zones showing increased leakage and enables repair action to be taken more quickly. The question is, how far has such an approach been extended to water operators in other states, especially states that still record high NRW rates such as Perlis, Kelantan, Sabah and so on? Accordingly, I would like the ministry to explain: from the RM500 million allocation under Item 95000, how much has been specifically allocated for pipe replacement, leak detection, installation of monitoring systems and the use of digital technology? Second, how far has the implementation of DMA, leak detection sensors and pressure control systems been extended to state operators, especially in states with high NRW rates? Third, can PETRA set performance targets based on the volume of water successfully recovered and the reduction in NRW rates for each operator, so that the effectiveness of government expenditure can be measured more clearly? Chairman, apart from efforts to reduce water loss in the distribution system, we also need to give attention to the new increase in demand for water and energy resources of the country, especially from the data centre industry, which was also discussed earlier by the Honourable Member for Puchong. I do not reject the importance of the data centre industry, but its development must take into account the real capacity of the country's water and electricity infrastructure. According to PETRA information reported in October 2026, water demand for data centres in Johor alone and in Selangor is projected to reach 389 million litres a day by 2030, while SPAN also reported actual usage of 63.90 million litres a day. In terms of energy, maximum electricity demand for the data centre industry in Peninsular Malaysia is expected to reach 8,391 megawatts by 2030. Johor alone is projected to require 4,428 megawatts, while Selangor requires 1,481 megawatts. These figures show that the growth of the data centre industry will bring a very large demand for utilities. Therefore, the question is not merely whether water and electricity supplies are sufficient to support new investment, but how the government ensures that such development does not affect the needs of existing domestic and industrial consumers.
I take note that the government already has an assessment mechanism through the Data Center Task Force and SPAN's guidelines on water-use efficiency and alternative sources for cooling purposes. Indeed, SPAN also requires the provision of water storage tanks capable of holding at least two days of data centre operations. However, the question is, how far is this mechanism implemented and monitored after data centres begin operating? In my view, there are three matters that need attention. Chairman, I ask for one minute. First, the use of alternative water sources. Data centres should be encouraged to use treated water or reclaimed water for cooling purposes, especially in areas with limited water supply reserves. This can reduce competition for treated water supplies for household use. Second, efficiency in water and electricity use. Data centre operators need to be monitored based on indicators such as water usage effectiveness and power usage effectiveness. For example, the Ministry of International Trade and Industry (MITI) sustainable data centre development guidelines set a design benchmark for WUE of 2.2 cubic metres per megawatt-hour or lower. This monitoring must continue throughout data centre operations, not merely at the time of the approval application.
Third, the developers' responsibility for infrastructure costs. The additional costs of upgrading water and electricity supply systems required specifically for data centre development should be borne fairly by the developers, and not transferred to domestic consumers. Accordingly, I would like the ministry to explain: how does PETRA ensure that every data centre application is assessed based on the capacity of water and electricity supply and the reserves that must be maintained for domestic consumers? How many data centres have used reclaimed water? And what is the monitoring mechanism to ensure compliance with the benchmarks I mentioned earlier? How will the government ensure that the additional costs of upgrading infrastructure arising from data centre development are borne fairly by developers, without burdening domestic consumers through increased costs or tariffs? Thank you, Honourable Chairman.
Thank you, the Honourable Member for Balik Pulau. Honourable Members, Honourable Members, I'm a very
reasonable person. If Honourable Members debate, even though the time given is 5 minutes, if Honourable Members debate in the interest of the district, the Parliament you represent, I can give more, but do not use the facility I give to engage in politics. If you want politics, outside, yes. We serve our people in the constituency. Look at the Honourable Members for Puchong, Machang and Balik Pulau. If Honourable Members debate in the interest of your parliamentary district, if I am the Chair, go ahead, but don't take overboard-lah. Right, let us continue, calling the next Honourable Member, the Honourable Member for Kuala Nerus.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Mr Chairman. I go straight to B.33 Item 030500 – Department of Irrigation and Drainage (JPS). The operating allocation for JPS has been reduced by 2.4 per cent, namely to RM141.7 million, and the asset allocation has been cut by 65.5 per cent, from RM11.13 million to only RM3.84 million. Meanwhile, the target of residents to be protected from flood risk is only 100,000 people for 2027, which is half the achievement target of 200,000 people in 2025. Moreover, the target for accuracy of monsoon flood warnings has been lowered from 70 per cent to 67 per cent. My question is, what is the basis for the ministry lowering these targets? Yet the allocation for flood mitigation plans has been increased by 55 per cent. I greatly appreciate the approval of the Sungai Buaya Kuala Nerus Flood Mitigation Plan worth RM198.17 million under the First Rolling Plan of RMK13, and the 55 per cent increase in the allocation for the National Flood Mitigation Plan, namely to RM1.44 billion for 2027. However, the ministry's answer at the First Meeting this year stated that this project is still at the pre-implementation stage, namely the RTB Sungai Buaya. The tenders opened so far are only for consultants for detailed design and survey work and preparation of land acquisition plans. This means the design is not yet complete and land acquisition has not yet been carried out. My question is, how much is the allocation for this project in 2027? When is the design and land acquisition expected to be completed, and when will physical work
begin? The people of Kuala Nerus very much hope that this project will be started and completed within a reasonable time. Next, Mr Chairman, I move to Item 15300 – Dredging River Mouths, which has been cut by 59.6 per cent, from RM207.9 million in 2026 to only RM83.9 million in 2027, which is much lower than the actual expenditure of RM302.3 million in 2025. For the information of the House, Terengganu has 14 river mouths, the most compared with other states, and the problem of shallow river mouths continues to squeeze livelihoods and affect the income of our fishermen. In February, more than 100 fishing boats at the river mouth of Sungai Merang, Setiu had to be pushed and wait a long time for high tide. Meanwhile, at the mouth of Sungai Kemasik, fishermen had to drag boats 300 metres before the engines could be started. These shallow river mouths also block the outflow of water during floods in future. Furthermore, permanent solutions such as wave breakers and channel dredging require large Federal allocations. The state cannot implement them alone and cannot rely only on temporary dredging, which eventually becomes shallow again within a year when the Northeast Monsoon occurs. My question is, how much is the allocation under Item 15300 for river mouths in Terengganu in 2027, and how will the ministry ensure that river mouth conservation projects being and to be implemented are not delayed due to this major budget cut? Next, Mr Chairman, I move to the allocation of the Sustainable Energy Division under Item 020200, which plans the development of renewable energy and the national energy efficiency policy. Only RM0.47 million with 26 positions, while the energy efficiency and renewable energy programme project is allocated only RM11.96 million. The government targets 35 per cent renewable energy capacity by 2030 and 70 per cent by 2050. However, the national renewable energy capacity target and the estimate for 2027 remain at only 14,000 megawatts, the same as the 2026 target. How can the 2030 target be achieved if capacity is not planned to increase from year to year? In Terengganu, the 595-megawatt hybrid floating solar project at Tasik Kenyir is expected to begin operations in 2028, and its energy is planned to be supplied to data centres. The 2027 Budget also announced a centralised solar park worth RM1.5 billion for government buildings.
However, energy transition must not be enjoyed only by big companies such as data centres and government buildings. My question is, how will this green energy technology also reach ordinary people, SMEs (IKS) and rural communities? What economic benefits and employment opportunities will be enjoyed by the people in the states that serve as sites for energy, such as Terengganu? As a conclusion, Mr Chairman, flood mitigation and river mouth conservation are not a matter of billions in budget documents, but a matter of the safety of lives, property and the livelihoods of the people. Energy transition must also be fair so that its benefits are felt by people in every state, not only by big companies and in big urban centres alone. The people have waited for a very long time. Every project that has been approved must be implemented immediately, because every time floods strike and fishing boats are stranded at river mouths, it is not the budget documents that bear the suffering, but our own people. That is all, thank you. Peace be upon you and the mercy and blessings of Allah.
Thank you, the Honourable Member for Kuala Nerus. The Honourable Member for Beaufort is invited to speak.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and greetings of wellbeing. Thank you, Dato' Sri Chairman. I wish to touch on Supply Purpose 33 for Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation, 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, 28000 – Sabah Water Supply Programme and 41000 – Sabah Electricity Supply. Dato' Sri Chairman, I welcome the overall allocation of RM5.33 billion to PETRA for 2027. However, for Sabah, particularly for the Beaufort Parliamentary constituency, the development priorities for water and energy infrastructure are not merely about building new projects, but also involve the safety of residents, the maintenance of drainage systems and the assurance of a continuous supply of water and electricity.
Firstly, the issue of flood mitigation and drainage systems. Beaufort is among the districts in Sabah that face the recurring risk of flooding, particularly during heavy rain and rising water levels in the Sungai Padas. This situation not only affects homes and property, but also disrupts the movement of residents, economic activities, schooling and the safety of the local community. Based on the Integrated River Basin Management (IRBM) study of the Sungai Padas that I raised previously in this House, 24 strategies and 67 action programmes have been identified for a period of 10 years, with an estimated total cost of RM2.1 billion.
Among the main proposals are the construction of flood walls, riverbanks and basin management measures to reduce the risk of flooding. Accordingly, I also request PETRA to expedite the implementation of this master plan, including the planning of the Sungai Padas Flood Mitigation Plan Project. I also wish to draw the ministry's attention to three areas that require action. Firstly, the Sungai Padas, particularly Kampung Melati, Kampung Melugus and Kampung Mempagar, which are always [Inaudible] flood problems and riverbank erosion. The Sungai Bekalau, which requires up-to-date riverbank protection— the Sungai Bekalau, which requires riverbank protection including the installation of gabions at critical locations. The Sungai Melabau to Sungai Keris Kecil, involving a drainage system of 13.595 kilometres that requires interior cleaning work and regular maintenance. I hope the allocations under Items 14500 and 16700 will not only focus on the construction of new projects, but will also cover the maintenance of existing drainage systems and the resolution of flooding problems in rural areas. Secondly, the assurance of clean water supply in Sabah. Dato' Sri Chairman, apart from the threat of flooding, the people of Sabah are also still facing problems of water supply disruption, low water pressure and ageing pipe infrastructure. According to the report tabled in the Sabah State Legislative Assembly in July 2026, the non-revenue water (NRW) rate, with respect, for Sabah in 2025 was still at 59.6 per cent, with a target to reduce it to 45 per cent by 2030.
These figures show the need for more comprehensive action in replacing old pipes, detecting leaks and improving the efficiency of water treatment plants. For Beaufort, the main water supply depends on the Beaufort 1 and Beaufort 2 Water Treatment Plants. Therefore, the project to upgrade the Beaufort 2 Water Intake System valued at RM29.93 million needs close monitoring so that it can be completed on schedule and increase the water supply capacity to residents. I also request the ministry to give attention to the rural villages, particularly areas at the end of the pipe network that are still experiencing water supply disruptions. Accordingly, I hope the allocation under Item 28000 – Sabah Water Supply Programme will give priority to the replacement of old pipes, the reduction of the NRW rate, the increase in the capacity of water treatment plants, and the expansion of treated water coverage to villages and interior areas. Thirdly, the assurance of electricity supply in Sabah. Dato' Sri Chairman, the issue of basic infrastructure development is incomplete without taking into account the stability of electricity supply. Disruptions to electricity supply not only affect the daily lives of residents, but also affect business operations, the tourism sector, small industries and public services. Just a moment, Dato' Sri.
Silakan.
I take note that the 2027 Budget provides support of RM600 million for Sabah's water supply, including the installation of a Satcom System valued at RM204 million at the Main Incoming Substation and Dam Road-Segaliud, as well as the continuation of the Southern Link transmission line project. I welcome this effort. However, the strengthening of Sabah's electricity grid must also take into account the needs of rural districts such as Beaufort. I request the ministry and relevant parties to give attention to the condition of transmission lines, substation capacity, infrastructure maintenance, and the recovery time when electricity supply disruptions occur. The economic development and well-being of rural communities should not continue to be affected by the stability of energy supply. Dato' Sri Chairman, in conclusion I wish to emphasise three priorities that require the attention and action of PETRA— firstly, expediting the implementation of the Sungai Padas Flood Mitigation Master Plan, which
is estimated to cost RM2.1 billion, including immediate solutions in high-risk areas in Beaufort. Secondly, ensuring that the Sabah Water Supply Upgrading Project is implemented on schedule, while intensifying the replacement of old pipes and reducing the NRW rate. Thirdly, strengthening Sabah's electricity grid network so that residents in rural areas also enjoy a stable and continuous electricity supply. I hope PETRA will give serious attention and commitment to these needs to ensure that every approved allocation truly benefits the people. That is all, thank you, Dato' Sri Chairman.
Thank you, the Honourable Member for Beaufort. I invite the Honourable Member for Bukit Gantang to speak.
In the name of Allah, the Most Gracious, the Most Merciful. Peace and the mercy and blessings of Allah be upon you.
Waalaikumussalam.
Dato' Sri Chairman, I wish to debate Supply Purpose B.33 and Development Purpose P.33. I refer to the DID Items. Let me read out 14500, 15000, 15200, 15300, 15400 and 16700, and 16800, which total RM3.102 billion altogether. In my view, this figure is large, but what is the real direction of the PETRA ministry, particularly the Department of Irrigation and Drainage (JPS), in dealing with the flood problem that keeps occurring? Not only in Bukit Gantang, but throughout the country. What models are there? How many models are there for us to see whether we can actually overcome the flood problem? In Bukit Gantang, the area with the heaviest rainfall in Malaysia. In these three consecutive years, JPS has estimated that 303,600 mm of rainwater will fall every year. This year, 60 per cent of the rain has already fallen. There is still 40 per cent left to fall. This means the potential for flooding will still occur in Bukit Gantang. The rain falls according to what JPS says. Rain falls on the hills, the water flows fast, but when it reaches downstream, it cannot, the water cannot go to the sea: firstly, because there are obstructions, namely the lack of maintenance.
Secondly, high tide. When high tide meets, a severe flood occurs which destroys government assets and property, the value of which we do not know much about. This is borne by everyone, and especially Bukit Gantang, in October twice, November also twice, four times already. Now it is the rainy season again. What is the situation? If you ask government agencies, they say the allocation is not enough, there is no allocation. Only when a flood occurs do they take action. Before the flood, they leave the maintenance condition undone. I want to propose a method commonly used by other departments, the JKR and so on, namely to do it by concession. Give responsibility for one river to a concession and see how it is implemented. Whether it succeeds or not? From upstream to downstream and responsible for all conditions. From upstream to downstream, responsible, and also when a flood occurs, the concession is the one responsible for paying compensation. This study can be done well so that several concepts can be implemented for us to solve the floods that occur every year. I hear everything when Members of Parliament debate, there is always a flood in their areas. So this has become a daily task. If periodic maintenance can be carried out, we will be able to save many things. So, Mr Chairman, the river in the upstream, midstream, downstream and estuary has four sections. On the upstream side, we must build water retention ponds. Because when a lot of development occurs, the water will flow down quickly. In the midstream, there is the dredging process. The problem is that not a single agency is fully responsible for the river. If it is dredged, the sand is placed on the side. It cannot be moved because that is a state power.
So with a concession, perhaps we can overcome the problem, the whole river is given responsibility to one concession so that it can be managed at all times and, God willing, reduce the floods. Even if we cannot eliminate them, at least we can reduce the floods, so that the lives of our people will be safer and they will not feel afraid when the sky goes dark, yes. I— thank you very much, Mr Chairman. Peace and the mercy and blessings of Allah be upon you.
Thank you, the Honourable Member for Bukit Gantang. Next, the Honourable Member for Puncak Borneo is not present. Right, let us call the Honourable Member for Kuala Kedah.
In the name of Allah, the Most Gracious, the Most Merciful. Peace and the mercy and blessings of Allah be upon you, and greetings of wellbeing. Thank you, Dato' Sri Chairman, for giving me the opportunity to debate Development Purpose P.33 of the Ministry of Energy Transition and Water Transformation (PETRA). I wish to touch on five related items— concerning project implementation, water resource security and preparedness for climate change. Mr Chairman, firstly, Item 15700 – Flood Mitigation Plan and Urban Drainage. I wish to return to the RTB project for Sungai Anak Bukit— Sungai Kedah, Anak Bukit, which I raised during the debate at the policy stage. Based on information I received from the JPS State Office of Kedah, the problem in implementing this project is not caused by a shortage of allocation, but rather is related to the performance of the contractor. Therefore, I propose that PETRA carry out a special performance audit of this project covering physical progress, compliance with the schedule and contract management. What intervention actions have been taken against the contractor to ensure [Inaudible] compliance with the implementation schedule. Is the latest completion date and the interim mitigation measures to protect residents from the risk of flooding? Dato' Chairman, I raise this problem because the people living next to the RTB concerned are always in a state of anxiety, especially when the monsoon season with heavy rain arrives. Among the villages at risk of being inundated are Kampung Bohor, Pulau Kerengga, Alor Madi, Kampung Chegar, Seberang Anak Bukit, Alor Pea and several other villages. Therefore, I request— I request the attention of the relevant parties. Mr Chairman, secondly, Item 15300 – Dredging of River Mouths. I wish to raise the problem of sedimentation at the Kuala Kuar Estuary, Kuala Kedah, which obstructs the passage of fishing boats in and out. According to local fishermen, dredging work was carried out by JPS a few years ago, but sedimentation has occurred again.
Has JPS carried out a recent sedimentation study at the Kuala Kuar Estuary? I also wish to know whether the ministry is aware of the periodic dredging mechanism based on the sedimentation rate and technical assessment, and whether Kuala Kuar is included in the work planning for 2027? Mr Chairman, thirdly, Item 12500 – Dam Rehabilitation. I wish to touch on the aspect of safety and sustainability of the water resources of the dam that supports the irrigation system of the MADA rice granary area, including paddy fields in the Kuala Kedah Parliamentary constituency. What is PETRA's technical assessment mechanism for identifying safety risks, sedimentation problems and the declining storage capacity of dams that require rehabilitation. How does PETRA coordinate technical assessment and planning with the dam management agency and the state government to ensure that the risk of water supply disruption to agricultural areas can be addressed earlier. Dato' Chairman, fourthly, Item 17000 – National Hydraulic Research Institute of Malaysia (NAHRIM). I wish to raise two matters. Firstly, to what extent has artificial intelligence (AI) technology been used by NAHRIM in hydraulic modelling and flood forecasting. Has the research result been operationally utilised by JPS and to improve the accuracy of forecasts and the effectiveness of early warnings. Secondly, related to climate change. How are the findings of NAHRIM's hydro-climate studies translated into adaptation policy and the planning of the national water structure? In particular, has the study of sea-level rise risk involving coastal areas such as Kuala Kedah been utilised in planning the protection of risk areas? Mr Chairman, fifthly, Item 06500 – Kedah State Water Supply Programme. I wish to seek clarification on the project to upgrade the Pelubang Water Treatment Plant, which is reported to be nearly complete. I have been informed that there are several issues related to the no objection certificate (NOC), with respect. What is the actual status of the NOC if the responsible party issued it, and does this matter affect the operating schedule of the plant? What are PETRA's coordination measures with the state government and related agencies to ensure this project can be completed without unnecessary delay.
Mr Chairman, I request the ministry to provide specific answers on the actions, timeline and solutions to the questions raised. That is all, thank you.
Thank you, the Honourable Member for Kuala Kedah. I invite the Honourable Member for Jempol to extend a welcome.
Thank you, Dato' Sri Speaker. On this occasion, with great pleasure, I welcome the visit of a group of students and teachers from Sekolah Kebangsaan (FELDA) Serting, Bandar Seri Jempol, to the Dewan Rakyat. Welcome to Parliament. Thank you. Thank you, Tan Dato' Sri Speaker.
Right, I invite the Honourable Member for Puncak Borneo.
Thank you, Dato' Chairman. I wish to debate Item 29000 – Sarawak Water Supply Programme and also Item 0520 – Dredging of River Mouths and also the flood mitigation project items. I wish to raise these items especially for my constituency in Puncak Borneo, where a fairly large allocation has been provided for the 2027 Budget. I hope that the PETRA Ministry can look at the river dredging work in the Puncak Borneo Parliamentary constituency, especially in Kampung Simboh, Kampung Bratan and Kampung Bawang, where these river mouths have become very shallow and require dredging work that must be carried out urgently. Apart from that, I also wish to raise riverbank projects that need to be repaired and also dredged because many flood occurrences take place in my area. This requires the attention of the PETRA Ministry, especially in the areas of Kampung Tarat Melawi, Kampung Tarat Sibala and also in areas such as Kampung Bratan, Kampung Asah and also Kampung Sikog, where floods frequently occur. I hope this matter can be looked at urgently and can be seen to address— the flood matters that need to be resolved.
Apart from that, Mr Speaker, Mr Chairman, sorry. I also wish to request that these river mouth dredging areas and flood mitigation projects be looked at comprehensively in my constituency in Puncak Borneo. Apart from that, there is also the Bengoh Dam, where I request the PETRA Ministry to see whether they can develop an early warning technology to give warnings if anything happens at this dam. Because although this dam is owned by Sarawak Water, I feel that the Federal Government through the PETRA Ministry also needs to do something to anticipate all possible disasters that occur, and we should have technology and warning information for residents so that this matter does not become a dangerous one. Furthermore, I also wish to touch on the flood mitigation projects that should be implemented in the Kampung Benuk area, which is also an area that often floods, and Kampung Giam, where during the monsoon season, especially in November, December, January and February, floods also frequently occur.
I also hope the PETRA Ministry can assist from the aspect of prevention. Finally, I also wish to have the latest information on the dam or water tank project in the Landeh area, Padawan area. In the Landeh area, where a water tank or water treatment plant has been proposed, I would like to know the status of this proposed project because we often have problems, especially in high areas and areas with weak water distribution. And during the recent drought, many villages did not have a water supply, where their gravity-feed systems in some cases dried up and so on. So, it is very necessary for us to build this new water tank and water treatment plant in the Landeh area. I request an explanation from the PETRA Ministry so that it can tell us what the status of this project is and when it will be implemented for the welfare of the community, especially in the Kuching area and the Puncak Borneo area. With that, that is all, thank you. May God bless.
That was a good speech because it is at the Committee stage that Honourable Members focus directly on their respective constituencies, especially on projects. Well done, Honourable Member for Puncak Borneo. Next, the Honourable Member for Kota Belud has withdrawn. So, I now go straight to the Honourable Member for Lumut.
In the name of Allah, the Most Gracious, the Most Merciful. Thank you, Dato' Sri Chairman. I move straight to Item 15000, which is the Minor Works allocation of the Drainage and Irrigation Department (JPS). The allocation for this item has decreased from RM105,321,000 in 2026 to RM103 million for 2027 after the amendment. I want to stress that JPS minor works are not a small matter to the people. Work such as cleaning drains, deepening rivers, repairing embankments, upgrading culverts, repairing drainage and overcoming blocked drains are basic needs that determine the safety and well-being of residents. The question is whether the allocation provided is truly sufficient to solve recurring flood problems, or merely to carry out repair work after an area has been hit by floods? I want to bring the ministry's attention to several problems and proposals that require immediate action in the Lumut Parliamentary constituency. The first is the recurring flood problem in Parlimen Limut. Among the matters that need attention is the drainage system, which is no longer able to cope with the increase in water flow. Drains and rivers are shallow due to silt deposits, and many rivers from neighbouring districts flow into the Limut Parliamentary constituency to reach the sea. Drains are blocked and not maintained regularly, culverts are too small and unable to cope with the flow of water during heavy rain, and low-lying areas often experience flash floods. The drainage system in residential and village areas is not aligned with new development, where drains from new housing under the PBT will be channelled into earth drains, whose maintenance falls under JPS and JKR and which need to be upgraded. There is a need to build flood retention drains for critical areas such as Pulau Pangkor. I would like to ask the ministry, what
approach JPS will take to ensure this work is carried out preventively and not only after floods occur. Second, regarding the JPS minor works allocation, it must be based on the needs of the people. I am of the view that the Item 15000 allocation should not be distributed on a purely equal basis. Instead, priority should be given to areas with a record of recurring floods, high-risk areas and areas with high population density. I propose that JPN prepare a priority list of minor works by Parliamentary constituency, taking into account residents' complaints, flood incident reports and technical assessments. Third, regarding the issue of maintenance and project monitoring. I also want to raise the question of the effectiveness of project implementation. What is the point of the government allocating money to clean drains and deepen rivers if the same problems recur every rainy season? I ask the ministry to give attention to the following matters. Upgrading drainage systems in residential areas and villages that are frequently hit by floods, deepening and cleaning major rivers and drains, replacing culverts that are no longer suited to the water flow capacity, repairing embankments and water control structures that need maintenance, and a comprehensive study of the drainage system in high-risk areas, especially in the Manjung district. Can the ministry provide a special allocation to overcome the recurring flood problem in the Lumut Parliamentary constituency, particularly in Pulau Pangkor? Dato' Sri Chairman, in conclusion, I want to stress that floods not only cause damage to property but also affect the lives, income and safety of the people. Do not wait until the people are hit by floods before JPS goes down to the field. Do not wait until water enters people's homes before maintenance work is carried out. JPS minor works may be small in terms of cost, but their impact on people's lives is very big. I hope the Item 15000 allocation for 2027 is truly translated into action on the ground, especially in the Lumut Parliamentary constituency. I have a pantun from me. If you go fishing, Don't forget to bring bait;
The debate on PETRA is very important. I await the Minister's reply.
Thank you, the Honourable Member for Lumut. The Honourable Member for Klang is invited to speak.
Thank you, Dato' Sri Chairman. I would like to refer to the Development Purpose P.33 Item 16700, Urban Flood Mitigation and Drainage Plan. With an allocation of RM1.441 billion, and Item 16800 – High Priority Flood Mitigation Projects, with RM1.032 billion for 2027. Both items involve nearly RM2.5 billion. Dato' Chairman, flood problems are not a new matter. Every year we hear announcements of billions of ringgit in allocations for flood mitigation projects. In the 2024 Budget, the government announced 33 high-priority flood mitigation projects with an estimated cost of RM11.8 billion. In the 2026 Budget, RM2.2 billion was allocated for 43 RTB projects, including 12 new projects. Indeed, on 28 October 2025, the Deputy Minister of PETRA informed the Dewan Rakyat that the government had spent approximately RM4.32 billion on RTB projects over the period 2021 to 2025. Now, for the 2027 Budget, PETRA once again announces around RM2.5 billion for flood mitigation projects. Meanwhile, in the policy-level winding-up, the Minister also informed that 151 RTB projects under RP2 RMK13 had been approved, with an overall estimated cost of RM28.1 billion. I want to ask, from all these announcements and expenditures, how many projects have actually been completed? How many are delayed, and how many flood-affected areas have been successfully restored on a lasting basis? I would also like to seek an explanation on the difference between the announcement of 154 RTB projects and the 151 projects under RP2 RMK13, as well as the breakdown of new projects, extensions and their annual allocations. Dato' Sri Chairman, I want to draw the Minister's attention to the situation in Klang. Among the areas reported to have been flooded are Taman Bayu Perdana, Bukit Raja, Taman Sentosa, Bandar Baru Klang, Taman Mutiara, Sungai Rasau, Kampung Batu Belah, Kampung Johan Setia. Recently there was
KESAS near Bukit Rimau, flooding. Federal Highway at the Bandar Baru Klang junction, Sungai Rasau, flooded. It flooded yesterday, Dato' Sri. Even though the sea is not at high tide, it still flooded. On 30 September, flooding in Taman Rashna was reported to have reached waist level, so that firefighters had to walk as far as two kilometres to rescue seven victims, including four children. This is not merely a statistical figure, this involves the safety of families, damage to homes, vehicles, businesses and the daily lives of the people.
Even more disappointing, on 23 July 2025, PETRA itself answered in this House that there are four Federal RTB Projects being implemented that involve the Klang District. First, the RTB Sungai Kapar Kecil and Sungai Kapar Besar, which began in January 2024 and are scheduled for completion in May 2029. When that answer was given, its physical progress was 6.09 per cent. Second, the Sungai Klang Dual-Function Retention Pond Project, Sungai Rasau package B, scheduled for completion in October 2031, with progress at that time only 1.21 per cent. Third, the RTB Sungai Klang at Seksyen 25, Shah Alam, scheduled for completion in January 2029, with progress at that time at 21.09 per cent. Fourth, the RTB Sungai Damansara, scheduled for completion in July 2029, with progress at that time at 6.75 per cent. Dato' Sri Chairman, I have to speak from Shah Alam to Klang because this is the Klang Valley, and my constituency is the downstream of the Klang River. I would like to ask the Minister to provide the latest status of all four projects up to November 2026, including the actual progress compared with the schedule, the amount that has been paid, implementation problems, and whether the original completion dates can still be met. For projects under the Selangor State Government, PETRA must work closely with the state government. Coordinate implementation through JPS and follow up and apply the appropriate pressure so that solving floods is not hindered by jurisdictional boundaries. Dato' Chairman, I need just one minute.
Sila.
When project after project is announced with values of hundreds of millions and billions of ringgit, yet residents still have to— save their belongings every time there is heavy rain. A very worrying perception has arisen among the people of the Klang Valley.
The people feel that their suffering has become a source of profit for contractors who obtain projects worth millions of Ringgit. Meanwhile, the people continue to bear losses caused by floods. I am not making accusations against any contractor, but this perception cannot be taken lightly. Dato' Chairman, somebody's pain becomes somebody's gain here. I am really very hurt by this matter. I want to ask, does PETRA evaluate contractor performance based on the actual effectiveness of the project or merely on the percentage of work progress and contract payments? Does the ministry conduct audits after projects are completed to measure the reduction in flood frequency, water levels, the area affected and the losses suffered by residents? We do not want flood mitigation projects that only succeed in channelling money to contractors but fail to channel water out of residential areas. Dato' Sri Chairman, I urge PETRA to present a transparent progress and effectiveness report on RTB Projects, particularly in Klang and the Klang Valley. The success of flood mitigation projects should not be measured by how many billions of ringgit are announced, but by how many houses are no longer reached by water. The people of Klang have waited far too long, they no longer want to just hear announcements. They want to see solutions. That is all, thank you Dato' Sri.
Thank you, the Honourable Member for Klang. The Honourable Member for Arau is invited to speak.
Thank you, Dato' Sri Chairman. How are you? Assalamualaikum warahmatullahi wabarakatuh. How are you, Malaysians, young people. First of all, I would like to extend condolences to all my friends and fellow Malaysians who have lost family members forever, who have passed away, and we pray that Allah bestows mercy upon their souls. I also want to take this opportunity to ask Malaysians to pray for our national weightlifting athlete, our golden athlete, Muhammad Hafizuddin Roslin, who has just undergone surgery following an accident yesterday. May he be well, and we hope all parties will be patient with this trial from Allah, namely for Hafizuddin.
Mr Chairman, the title is 030400 – Drainage and Irrigation Department, RM28.1 billion. The question now is, everyone knows that this project is big, but floods continue to occur. And the saddest thing is that when the new government took over, projects that were carried out— implemented by the previous government were postponed or cancelled. So, I want to ask, what happened to those postponements? Were they carried out— were those projects carried out? If they were carried out, why are floods still occurring? That is a big question, yes. Then, I want to ask the ministry, yes. When we do flood mitigation, we mention these are spots where flooding occurs. So we do flood mitigation because of that. I want to ask, did the consultants and advisers look at what would happen later? Flood mitigation is completed, but after a year or two, floods occur. Because we must remember, the flow of water carrying silt from upstream deposits in the areas downstream where floods occur. We complete flood mitigation but the deposition continues. I want to ask, does the ministry take into account the speed of the water and the deposition that occurs? And do we realise that— do I want to ask a question?
Ya, Arau.
Ya, boleh.
Briefly. Does Arau agree that for any flood supply projects that we spend hundreds of millions on, where the flooding returns, the contractor should be audited?
Yes, I support the child of Bung, Kinabatangan. Include part of my speech, I also— PN/BN are already together, yes. Okay, let us return to this title, Dato' Chairman who is beloved. I support you, Dato' Chairman, yes, that this deposition occurs upstream of the river. Can the government allocate, say, 10 per cent or even 55 per cent of the flood mitigation allocation for planting trees upstream of the river? When we plant trees upstream of the river, we will slow down the speed of the water. If the water is too fast, it will cause floods to occur. When water comes rapidly from upstream, because there are no such trees, the colour of the river water is red. Now we are grateful that on the land, the blue of the river water— we make the river water blue. But not the blue like in the Perak River, because that involves mining. This is the true blue of water. So, make the water blue that is also on the land. So, we ask the government to allocate a certain percentage. I propose 15 per cent or 10 per cent for planting trees upstream. The purpose is to
slow down the movement of water. When the water slows, it will also prevent the deposition from being carried to the downstream of the river. Because fast-flowing water will carry sediment rapidly, and therefore floods will occur. Flood mitigation, I have been shouting about this for a long time, why is the speed of the water and also the deposition not taken into account? Fast-flowing water will erode the soil and carry it downstream. I ask the consultants, the great and formidable national consultants, to take that into account. The speed of water and sedimentation. Sometimes the sedimentation at that time is so much, but after we carry out flood mitigation, the sedimentation is different because people continuously cut down trees. So, I ask that the government take into account in the consultancy study that a certain percentage be included to improve the upstream of rivers. The next question is river deepening. People criticised me when I was Minister before for using sand. We must remember, during floods we must resolve them immediately. And we have reduced hotspots from 200, down to— I am not sure, perhaps 15 flood spots, because we used sand bunds. Deepening rivers is a long-term measure, for the short term we must use the best available. So, I propose that the river of life here be the best example in this country and be extended to Selangor. Why is river of life only in Kuala Lumpur? Along Selangor, we deepen rivers and beautify rivers. I see that among the beautiful rivers, Dato' Sri, is the river in Melaka. This is 100 per cent allocation from the Federal Government, to repair the Melaka River and make it beautiful, which can be used for tourism. Then the river in Kuching. We see Kuching being improved. If we cannot do all of them, start first. We cannot do the entire river network. We will start first in urban areas to improve and deepen those places first. Then, gradually, we improve the rivers. We must remember, in this world, all developed countries pay attention to rivers, the River Thames, London. During the industrial revolution, all the Polytech, with respect, but now it has been repaired, so that the water can be used, drinking water. The rivers in Holland, where I studied before, doing a Masters Degree, the rivers in Holland.
The rivers in Holland, where I studied before, doing a master's degree. The rivers in Holland, all the rivers in Holland, Holland has no hills. The country in this world without hills is Holland, but it has rivers and its rivers
can be used for drinking water. Why? They repaired the riverbanks and deepened the rivers so that the rivers could become not places for tourism, but a source of water. And finally, Dato' Sri Yang di-Pertua, who is beloved, that is about this— can I have a pantun for a little while? Yes, a pantun continuing from yesterday, because earlier people were reciting pantun.
Honourable Member, a pantun is allowed, but do not make insinuations.
No, no, no. This is not an insinuation, this is a pantun made for the sake of Allah. I am seeking the blessing of Allah.
Okey.
Like Yang di-Pertua, there is no Chairman in this world who comes in, we recite prayers. The Chairman recited a prayer again. This is a Chairman who is extremely great. Although the Chairman keeps praising Members of Parliament, I praise the Chairman for reciting a prayer. Alhamdulillah, may Allah bless. I want to repeat yesterday's pantun so that we are courteous in the House, yes. If you go fishing, Don't forget to bring a boat; Though we live apart, Don't forget manners and courtesy. This carries a message of unity. So, someone rebuked Tok Guru yesterday about his statement. I want to look at the Hansard again. Tok Guru did not mention Malaysia, he mentioned abroad. For example in Palestine, in Myanmar, about what is happening, in several other countries where Muslims are a minority and have been oppressed and humiliated. Moreover, if we read The History of Pattani, the Pattani Sultanate, we see that among the people who were most persecuted, the most severely in the world at that time, were the people of Pattani, for example, yes. So, this is what is happening abroad but they refer to Tok Guru as if he said it domestically. In fact, in this country Tok Guru has said it already. In this country, look, non-Muslims live in Malay society.
Yang Berhormat.
Malays provide protection and affection to non-Malays. Yes, thank you Dato' Sri
Yang di-Pertua. Since we are together now, I support this ministry. Thank you. Assalamualaikum.
Waalaikumussalam. Thank you, the Honourable Member for Arau. Alright, the Honourable Member for Batu Pahat is now invited to speak.
Thank you, Deputy Chairman. Before that, I seek the permission of the Deputy Chairman because I would like to welcome the delegation of the MADANI Community Penggaram from the Parliament of Batu Pahat, led by the Former State Assemblyman for Penggaram, Ms Gan Peck Cheng. Mr Chairman— Deputy Chairman, Batu Pahat wishes to touch on three items under the Ministry of Energy Transition and Water Transformation (PETRA). Item 17000 – NAHRIM. Deputy Chairman, Batu Pahat refers to this item, namely on NAHRIM with an allocation of RM70.2 million for 2027. Batu Pahat seeks the Minister's explanation regarding this allocation: what research, study and technology development projects will be implemented by NAHRIM throughout 2027? How many projects are planned, where will they be implemented by state and district, and how much allocation is provided for each project? Do these projects involve studies on climate change, sea level rise, coastal erosion, coastal flooding and saltwater intrusion into river systems? And Deputy Chairman, Batu Pahat wishes to raise an increasingly worrying issue, namely the impact of sea level rise caused by climate change as well as human activities, which can cause saltwater to intrude into estuaries and upper reaches of rivers. This phenomenon not only affects river ecosystems but can also disrupt freshwater supply, agricultural activities, fisheries and the livelihoods of residents in coastal areas. The next item is 15300 – Dredging River Mouths, amounting to approximately RM83.9 million. Deputy Chairman, Batu Pahat wishes to touch on the allocation of RM83.9 million for river mouth dredging works. In the context of Batu Pahat, the Batu Pahat river mouth is the most important area because the flow of this river is
closely related to the drainage system, water movement and flood risk in the surrounding areas. Therefore, Batu Pahat seeks an explanation: what is the latest status of the Batu Pahat river mouth dredging works? Has this project commenced, is it still at the planning stage, or is it in the tender process? Next, how much specific allocation has been approved for this project? And has the ministry conducted a study to identify the level of sediment deposition and the required dredging depth at the river mouth area? And when are these dredging works expected to be carried out and completed? Batu Pahat also wishes to know whether the ministry has a schedule for periodic dredging maintenance so that the sedimentation problem does not recur after the project is completed. This is because we do not want dredging projects to be carried out only once, only for the same problem to recur after a few years. Item 616700 – Flood Mitigation Plan, amounting to RM1.4 billion. Deputy Chairman, this item involves a very large allocation of RM1.4 billion for the flood mitigation plan. Batu Pahat wishes to give specific focus to the Batu Pahat flood mitigation project, which has now entered its third year. Batu Pahat wishes to ask the Minister: after these three years, how far has this project progressed? The ministry is requested to provide a detailed explanation. First, what is the percentage of physical and financial progress of the Batu Pahat RTB project? Has it deviated from the original target? Second, what is the total approved project cost and what is the actual amount spent until today? And, is the implementation of this project according to the original schedule or has it experienced delays? If delayed, what are the causes of this delay? And, the components of this project – have these components been completed, are they being implemented, and have some not yet started? Deputy Chairman, Batu Pahat wishes to ask what indicators the ministry uses to measure the effectiveness of the Batu Pahat RTB project? What area is expected to be protected from floods and how many residents will benefit when this project is completed? Deputy Chairman, what is more important is the efficiency of implementation, contractor monitoring and the effectiveness of every Ringgit spent. Therefore, Batu Pahat hopes the ministry can provide a conclusive answer regarding the issues Batu Pahat has raised today. Thank you.
Thank you, Honourable Member for Batu Pahat. The last debater before we break for prayers and lunch. Honourable Member for Padang Serai, you have the floor.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Dato' Chairman, for giving Padang Serai the opportunity to also take part in the debate on the Supply Bill 2027 at the Committee stage of the Ministry of Energy Transition and Water Transformation (PETRA). I wish to refer to Supply Estimate B.33, particularly under Item 02000 – Energy Development, and Development Estimate P.33 relating to Item 15400 – River and Eco-Friendly Drainage Management Plan and Flood Mitigation Projects under the Drainage and Irrigation Department (JPS). First issue, Dato' Chairman, the burden of electricity tariff increases. I wish to touch on the issue closest to the people's pockets today, namely the cost of living that continues to be squeezed by electricity tariff adjustments and increases. Although the government often gives assurances that the majority of domestic consumers are not directly affected, the reality on the ground is otherwise. Increases in electricity costs at the commercial and industrial levels are ultimately passed on to consumers through higher prices of essential goods and services. In areas such as Padang Serai, which has many low-income B40 and middle-income M40 groups, every sen of increase in utility bills is keenly felt. I seek an explanation from the ministry under Supply Estimate B.33: how effective are these targeted tariff control and subsidy mechanisms in truly protecting the people from the effects of the inflationary chain? What are PETRA's long-term or medium-term plans to ensure electricity tariffs remain stable without burdening domestic consumers and small traders? Dato' Chairman, second issue, the proposed rebate for residential solar installation is in line with the national energy transition goal and reducing dependence on the conventional grid. I wish to propose that PETRA expand access to renewable energy directly to the household level. At present, the initial cost of installing solar panels on rooftops is still too high and can only be afforded by high-income T20 groups.
Therefore, Padang Serai proposes that the ministry introduce a direct cash rebate scheme or a special matching grant for M40 and B40 groups for the installation of residential solar systems. Apart from the existing clean energy metering programme, providing a direct rebate on the installation cost not only can drastically reduce monthly electricity bills but also helps the country achieve its renewable energy capacity targets more quickly. I request that the ministry state whether the allocation under Item 02000 has room to pilot this domestic solar rebate initiative in 2027.
Dato' Chairman, the third issue concerns the problem of drainage and flash floods in the Padang Serai area. I turn to Development Estimate P.33 under the water transformation sector. The issue of outdated drainage systems, clogged drains and shallow rivers in the Padang Serai Parliament area continues to plague residents every time heavy rain falls. Residential areas and small town areas around Padang Serai, Lunas, Karangan and others often face the risk of flash floods that damage property and disrupt local economic activities. Alhamdulillah, two or three months ago I received a small allocation from APPGM–SDG amounting to RM40,000 for river deepening and straightening, as well as drain cleaning and so on. I hope this can reduce the risk of flooding. Thus, the rapid growth of residential and industrial areas on the border of Kulim and Padang Serai is not balanced with a comprehensive upgrading of the drainage system. Therefore, I urge PETRA through JPS to channel the allocation under P.33 for works to deepen rivers, widen the main drainage system and maintain existing retention ponds in the Padang Serai Parliament area so that this flood problem can be reduced or we can resolve it. Thank you, Dato' Chairman.
Thank you, Honourable Member for Padang Serai. Honourable Members, the House resumes sitting as the Majlis Mesyuarat. Bentara. [The Majlis Mesyuarat resumes sitting]
[Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
Honourable Members, the sitting is suspended and will resume at 2.30 p.m. later for rest and prayers.
[The sitting was suspended at 1.01 p.m.]
[The sitting resumed at 2.30 p.m.]
[Deputy Speaker (Puan Alice Lau Kiong Yieng) presided
Honourable Members, the House in Committee. [The House sits in Committee] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presided
I invite the Honourable Member for Kalabakan.
Thank you, Madam Chairman. Assalamualaikum and greetings. I will proceed directly to the debate under Item 28000 – Sabah Water Supply Plan. I seek an explanation of the long-term solution to the water supply problem in Pulau Sebatik, Kampung Brantian and also Kampung Sungai Udin. The Kampung Brantian Water Supply Project was submitted by the Ministry of Rural and Regional Development (KKDW) under RP5 of the Twelfth Malaysia Plan (RMK12) but was not listed and now has to be raised by the Sabah State Planning Unit to the Ministry of Economy under the Thirteenth Malaysia Plan (RMK13). Therefore, what are PETRA's follow-up actions, together with KKDW and the state government, to expedite this project? Please state the lead agency, the reasons for approval constraints and the action timeline so that residents receive certainty as to when this issue will be resolved.
Second, still under Item 28000 – Sabah Water Supply Plan, regarding the construction of a new reservoir or off-river storage to support the Wallace Bay Water Treatment Plant on Pulau Sebatik. Since the Wallace Bay Dam once dropped below a critical level, less than one metre― and even now the water level at the Wallace Bay Dam is between 1.2 and 1.5 metres― affecting thousands of residents. This off-river storage project is very urgent to complement the storage capacity of the existing dam. Accordingly, I wish to ask: what is the status of the technical assessment, land acquisition and financing approval? The ministry is requested to state the decision timeline as well as the proposed storage capacity. So, while waiting for completion, what is the emergency supply plan when water sources dwindle? As is the case now, residents have gone more than a month without water supply through the Water Department's network. Therefore, this plan must include a planned schedule for static tank water deliveries and a clear complaints channel, with certain priority given to schools, clinics and residents' homes. I also wish to know the latest status of the Cinta Mata Dam and Cinta Mata Water Treatment Plant project since this project is a comprehensive solution to the critical water supply problem plaguing the Tawau District. I also propose that if this dam is completed, an undersea water pipeline connecting the Cinta Mata Dam with Pulau Sebatik should also be considered as an alternative to the existing water supply on Pulau Sebatik. Madam Chairman, third, under Item 95000 – National Non-Revenue Water. I welcome the Phase 2 NRW reduction programme to replace old pipes and request specific details for the Kalabakan Parliament area. How many kilometres of dilapidated pipes will be replaced? Where will the implementation locations be? What is the target for reducing water loss and when is the completion period? As an example, the Taman Semarak housing area often experiences burst water pipes due to the dilapidated condition of the water pipes. Madam Chairman, fourth, under Item 16700 – Flood Mitigation and Urban Drainage Plan and Item 16800 – High Priority Flood Mitigation Projects. I request the ministry to expedite approval of the Sungai Tawau Phase 1B RTB project valued at RM1.11 billion that was brought forward to RMK13, given the condition of the Tawau River and surrounding areas, which will certainly
experience flooding when high tide and heavy rain occur simultaneously. Many people are affected and it frequently happens, causing losses to local residents. I also wish to know, what are the actual constraints of this project? When will the final decision be made and what is the financing structure of this project? Meanwhile, maintenance works on rivers, culverts and critical drainage around the Tawau District need to be accelerated with a clear schedule, and the design between phases should be coordinated so that flood risk does not shift to adjacent settlements. Madam Chairman, fifth, under Item 41000 – Sabah Electricity Supply. I request an explanation regarding the financing of the Sabah Southern Madani Link Phase 1B from Upper Padas through Kalabakan to Tawau, spanning 274 kilometres, with an estimated cost of RM1.4 billion. Since Phase 1A has already begun, the approval of Phase 1B must be expedited so that the East Coast grid does not stop halfway. Therefore, I wish to know: what is the latest status of financing approval, land acquisition, procurement process and the date physical work begins? The villages around the town of Kalabakan depend entirely on diesel gensets and old solar systems. So, this Southern Link is very necessary. I also wish to obtain an explanation regarding the status of the Luasong substation construction, which remains stalled. Last, Madam Chairman. I also request an explanation of the mechanism for coordinating electricity bill subsidies for consumers in Sabah so that the expanded protection for up to 800 kilowatt-hours truly reaches eligible households in the interior. Thank you.
Thank you, Honourable Member for Kalabakan. I invite the Honourable Member for Parit Buntar.
Assalamualaikum warahmatullahi wabarakatuh, greetings. Bismillahirrahmanirrahim.
Madam Chairman, I wish to refer to Item P.33 14500 – Infrastructure Upgrading and Urban Regulation, Flood Mitigation, as well as Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. I would like to know: what is the total flood mitigation allocation channelled to the Kerian district, particularly Parit Buntar, in 2027? Because the 2027 Budget and RMK13 do not clearly state the allocations channelled to the Kerian district, especially Parit Buntar and its surroundings, for flood mitigation. Parit Buntar, as well as other districts in Perak, are often hit by flash floods. Flash floods have recurred in the same locations since 2017 without a structured solution. The Kerian district experiences two types of flooding simultaneously. First, flash floods after very heavy rain. Second, stagnant flooding in paddy field areas due to drainage that does not flow out. Recently, on 28 October 2026, several villages in Teluk Piai and others in Kuala Kurau were inundated by overflow from paddy fields that had stagnated for almost a week, destroying rice crops because the drains had not been maintained properly.
In the Parit Buntar town centre, residential areas in Pekan Baru, Taman Kerian, Taman Damai, Taman Sri Wangsa, Taman Semarak, Taman Wawasan, Taman Aman Sejahtera, Taman Desa Aman and others often experience repeated flooding every time heavy rain falls, for a period of nine to 10 years. The flash floods that occur are caused by very heavy rain and drainage channels under the Railway Asset Corporation (RAC) that are not maintained according to schedule. Therefore, they need to be maintained periodically every year. The agencies such as JPS and RAC need to have consensus and be responsible. A few months ago, I, together with RAC, JPS and the local authorities (PBT), conducted an inspection and visit to several major drains that caused floodwater not to flow properly into the Sungai Kerian because they had not been maintained. The issue is that they often question the lack of allocation, no allocation, no allocation, and there is no authority for any party to carry out drain cleaning or maintenance under JPS or under the PBT and so on. Another cause is when drains are not maintained periodically. Therefore, upgrading the drains along the road reserve, including the culverts that cross
residents by using culverts. It is proposed that a pump house be built at the end of the canal road so that the pump house can discharge water into the Parit Buang, especially during high tide. Therefore, the authorities must take this matter seriously, because village communities or residents in housing areas often complain to Members of Parliament or State Assemblymen so that they will voice it to whichever agency is involved. In this Parliament, I urge the Ministry of Energy Transition and Water Transformation (PETRA) to pay attention to the flood mitigation project in Parit Buntar, which disturbs residents' comfort. This is because floods occur at any time. Midnight, early dawn and so on. Although a flash flood may last one or two hours before receding, it causes anxiety and discomfort, and there is no clear allocation for flood mitigation projects in the district of Kerian, especially Parit Buntar. That is why it often happens in housing areas in the town of Parit Buntar, disrupting businesses and disrupting the movement of people who constantly travel to work and so on. That is why I, the Honourable Member for Parit Buntar, propose that in those areas there must be pumps so that water can be pumped out into the river, because that is the only best way to prevent flooding. Finally, I would like to recite a passage from the Al-Quran as a reminder for us all, from Surah Ar-Rum, verse 41, which reads— [Reciting a passage from the Al-Quran] Destruction has occurred on land and at sea because of the hands of men. Floods may also occur due to human negligence, arising from unplanned development, many housing projects and so on, but drains are not maintained properly. Therefore, when we develop, development must be planned so that when flash floods or heavy rain occur, the water can flow well towards the river. That is all, thank you.
Thank you, the Honourable Member for Parit Buntar. I invite the Honourable Member for Sipitang.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you, Madam Chairman.
The Sipitang Parliamentary constituency comprises two State Legislative Assembly (DUN) areas, namely Sindumin and Lumadan. The DUN Sindumin is located entirely within the district of Sipitang, while the DUN Lumadan area is within the Beaufort District. In this debate, Sipitang wishes to bring to the attention of the Ministry of Energy Transition and Water Transformation, or PETRA for short, several critical issues related to water management, flood mitigation, river erosion and electricity supply that have long plagued the people. First, in DUN Sindumin under Item 14500 – Upgrading of Urban Infrastructure and Drainage (Flood Mitigation). Sipitang seeks serious attention to the need for flood mitigation projects and upgrading of the drainage system in Sindumin. The overflow of the Mengalong River and a drainage system no longer able to accommodate the flow of water have caused 17 villages to be frequently hit by floods, and some take more than a week to recede. This is not merely water overflowing into people's yards, but also submerging sources of livelihood, damaging property and paralysing residents' lives. Sipitang requests that the ministry consider special allocations to implement comprehensive flood mitigation projects and upgrade the drainage system for a long-term solution. Next, under Item 15300 – Dredging of River Mouths. Sipitang also requests dredging work upstream and conservation of the mouths of the Sipitang River and the Mengalong River. Sediment deposition not only prevents the discharge of water into the sea but also hinders the passage of fishing boats and agency operational boats when the water recedes, particularly at the mouth of the Sipitang River involving Kampung Menengah, Kampung Lumut and Kampung Guruh-Guruh. Dredging work is very urgent for the smooth navigation, safety of fishermen, reducing the risk of flooding and smooth passage of fishermen in the area. If the conservation of river mouths has been given attention, we also hope that the Sipitang River and the Mengalong River will receive due consideration. Second, in DUN Lumadan under Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, and Item 16800 – High-Priority Flood Mitigation Project. Residents also face recurring floods up to nine times throughout 2025 due to the overflow of the Padas River and the Bukau River. Among the affected areas are Kampung Luagan, Sanginan, Suasa, Kebajang,
Bangkalalak, Mentulud, Bukau, Lingkungan and most areas in DUN Lumadan. Imagine, Madam Chairman, when floods come again and again, the people not only lose property but also lose working time, agricultural produce and peace of mind. They should not continue to live in fear every time it rains. Therefore, we request that the ministry approve allocations for high-priority flood mitigation projects in the DUN Lumadan area, including improvements to the drainage system and related river infrastructure. Next, under Item 15200 – Improving, Beautifying, Cleansing and Treating Rivers. Sipitang wishes to raise the issue of riverbank erosion, which is becoming increasingly critical in many areas around DUN Lumadan, as I have raised in several previous debates. Among them are Kampung Lubak, the cemetery area of Kampung Lubak, the cemetery of Kampung Beringin, and Kampung Kaundu, Suasa. River erosion also threatens the safety of nearby houses, including in Kampung Luagan Sanginan whenever rain and floods hit. This is not merely a matter of losing land but a matter of the safety of homes, the continuity of agricultural land and respect for the burial grounds of our ancestors. Let us not wait to act only after the land collapses, houses are threatened or graves are eroded by the current. In pursuing the agenda of basic infrastructure development, Sipitang wishes to stress under Item 41000 – Sabah Electricity Supply (BASE) that a stable electricity supply is not merely a necessity but is the lifeblood that animates the pulse of life for communities in rural areas. Therefore, Sipitang requests that the construction of new electricity substations at Kampung Lalangut, Suasa, Kampung Kukup, Bangkalalak and Kampung Kehidupan Western be given serious attention to overcome the voltage drop problem that has long plagued residents. Likewise, the proposal to upgrade bare overhead cables and lines to insulated cables over a length of 1.3 kilometres at Kampung Western is to ensure safety and the stability of the electricity supply. At the same time, the proposal to repair and replace 150 units of village street lights in the Lumadan zone should be given priority. Let us not allow the villages in the interior to continue struggling in darkness, when the light
of progress should illuminate every house, every road and every life of the people, regardless of where they are. Finally, once again, Madam Chairman, Sipitang hopes that the ministry can give serious attention and a clear commitment to all the matters we have raised in this august House. Do not let the people continue to be submerged in floods, struggling in darkness, living in anxiety. Strive for solutions for a brighter tomorrow. Water should be a source of life, and electricity should be a ray of hope, not a threat to life. That is all, Sipitang humbly supports. Thank you, Madam Chairman.
Thank you, the Honourable Member for Sipitang. I invite the Honourable Member for Rompin.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you, Madam Chairman. I shall go straight to Item 13900 – Flood Control and Warning Signals Scheme.
Firstly, I welcome the government's commitment to strengthening preparedness through 24-hour monitoring operations by the National Flood Forecasting and Warning Centre, telemetry systems and the installation of early warning sirens throughout the country. However, given that the 2026 and 2027 Northeast Monsoon phases have already begun since late October and are expected to last until March 2027, specific focus and immediate action are very much needed in high-risk areas such as Rompin, for example. Rompin faces the threat of continuous heavy rain every year, overflow of major rivers such as the Rompin River, and the phenomenon of large high tides. My question to the Honourable Minister is, what preparedness measures have been implemented by PETRA through the DID in terms of the flood forecasting and warning system, readiness of assets and coordination of operations to ensure the safety of residents in high-risk areas? Item 15100 – Coastal Erosion Prevention. The coastline of Rompin is now facing an extremely critical erosion threat. The fierce waves of the South China Sea batter the Rompin coast year after year without end. Today the coastal
coastline from Kuala Rompin to Tanjung Pahang is experiencing very severe degradation. As reported by a New Straits Times reporter on 22 August 2026, a residence owned by Madam Nur Zakiah at Kampung Jawa vanished in an instant due to the huge waves that struck. The house was actually provided by a financial institution for her family in 2009. My question is, what is the actual breakdown of the allocation under Item 15100 for 2027 that will be distributed directly to the Rompin district, particularly for hotspot areas such as Tanjung Pahang, Kampung Jawa, Pontian and the coastline of resort islands such as Kampung Mukut on Tioman Island? What is the detailed status of the coastal mitigation fund application amounting to RM850 million that has been submitted by the Pahang State Government under the RMK13? I propose that PETRA together with the Department of Drainage and Irrigation (JPS) immediately approve the implementation of the construction of permanent protection structures comprising a wave-breaking wall of 5,000 metres and the construction of breakwater structures, as it were, in an integrated manner without waiting for the next rolling plan cycle, to prevent losses of millions of Ringgit in government assets and the people's land. Furthermore, Madam Chairman, Item 15300 – Dredging of River Mouths. The Rompin River basin, with a course of 172 kilometres, is the main economic route for the local community. This river mouth is the daily entry and exit point for hundreds of traditional fishing boats, tourism boat operators, recreational fishing vessels, and logistics to the Malaysian Fisheries Development Authority (LKIM) landing jetty. However, due to the monsoon phenomenon and the movement of beach sand, the Rompin River mouth is experiencing severe silt deposition, causing the sea channel to become shallow, fishing boats frequently run aground, boat engines break, operations are paralysed and the safety of the lives of our seafarers is threatened while navigating the waves at the mouth during low tide. My question is, does the ministry have a work plan to deepen the Rompin River mouth on a scheduled basis throughout 2027? And is the allocation under Item 15300 sufficient to remove 149,000 cubic metres of silt? Secondly, why does the ministry still maintain a one-off or seasonal dredging approach when this river mouth has proven to constantly experience rapid re-deposition of sand immediately after the end of the monsoon season?
I would like to propose one holistic and sustainable solution, namely a river mouth dredging project of 1,000 metres in length with a channel width of 20 metres and a minimum depth of 1.5 metres, implemented together with the construction of two units of river mouth wave-breaker structures (twin breakwater). This structure has been scientifically proven to guide the river current and naturally carry sediment out to deep sea without requiring repeated dredging expenditure. In conclusion, the issues of a shallow river mouth and the collapsing coastline in Rompin are closely linked to dignity, economy and the safety of lives. I humbly request a transparent reply from the Honourable Minister. That is all, thank you.
Thank you, the Honourable Member for Rompin. I invite the Honourable Member for Batang Lupar.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Greetings of peace and greetings of unity. Thank you to the Honourable Madam Chairman for giving me the opportunity and chance to debate this afternoon on the Motion on Development and Supply 33 of the Ministry of Energy Transition and Water Transformation (PETRA). The first item, Madam Chairman, is Item 15100 – Coastal Erosion Prevention. In 2023, on 9 February 2023, I went together with the JPS Sarawak, and the Director of JPS Sarawak at that time also went to an area at Kampung Maludam better known as Pantai Riung. Thank you to the JPS at that time for being together to see the state of coastal erosion in this area. I understand this project has an allocation of RM316.3 million, comprising four packages in total, and will be implemented at 17 locations throughout the state of Sarawak. I am concerned about the coastal erosion at Kampung Maludam, Madam Chairman, because this area is traversed by the coastal road in Sarawak, which connects from the Batang Lupar Bridge to the Batang Saribas Bridge. When I visited this area in 2023, the distance from the road, that coastal road, to the erosion site was approximately 500 metres. But now that we have entered 2026, this project still has not been implemented. The road is now only about 50 metres away from the erosion site.
Therefore, I request the ministry to look into this project and expedite it, and I understand this project is at the procurement stage, and based on current planning, all four packages are in the detailed design phase and from November 2026, after procurement is finalised. So, I request, if possible, to PETRA that in 2027 this project be implemented immediately because we do not want the road in the coastal road area to be cut off. Secondly, Item 15000, allocated RM103 million, namely Minor Works of JPS and Various States. I would like to touch on the cleaning of drains in the Batang Lupar Parliamentary constituency. If I look at the work carried out by JPS all this time, the scope of work is to clean drains. Cleaning drains, when we see the excavator digging the drain, they only clear the grass inside the drain. I request JPS to include in the scope of work the cleaning of drains by dredging the sludge inside the drain, because if we do not remove it, the water will not flow smoothly. I would like to state the areas affected by these drains. I request JPS to clean the road from Sri Aman to Kampung Lingga on both sides of the road. I also request that it be cleaned from the Batang Sadong Bridge to the Batang Lupar Bridge on both sides of the road drains. From Triso to Batang Saribas, continuing to the central junction at Pan Borneo. These are the areas that need to be cleaned, and the proposal is for the DID to clean these roads not during the monsoon season. If we know the monsoon season occurs at the end of the year, in months 12, 11 and so on, these cleaning works should be carried out two or three months earlier.
Finally, Madam Chairman, I hope that the two items I have raised will receive attention and action from JPS. That is all, thank you. I humbly support.
Thank you, the Honourable Member for Batang Lupar. I invite the Honourable Member for Kangar.
Thank you, Mr Chairman. Peace be upon you, and the mercy and blessings of Allah. Firstly, my best wishes to Brother Hafizuddin Roslin, the Commonwealth Games gold medallist athlete, for a speedy recovery. Item 14500 – Upgrading of Urban Infrastructure and Drainage, together with the flood mitigation project of RM38 million for the year 2027, Honourable Deputy Minister. Together with Item 16700 – Flood Mitigation Plan and Urban Drainage of RM1.4 billion. The main focus is the issue of seawater intrusion into the Sungai Lencongan Barat, particularly the areas of Wang Besar and Wang Hulu in the Kangar Parliamentary constituency. The Sungai Lencongan Barat is not merely a drain to carry excess rainwater, it also has a relationship with agricultural areas, settlements, residents and the environment. When seawater enters the river system, particularly during high spring tides or when the flow of freshwater decreases, concerns arise over the increase in water salinity. So, the question is to what extent has PETRA identified and evaluated this phenomenon scientifically? If this matter is not addressed, it will affect agricultural land, crops, water quality, the river ecosystem and the lives of residents who depend heavily on water resources. So, for the information of the Honourable Deputy Minister, the rice plants have already turned yellow when exposed to salt water, and this has happened in the Wang Hulu area and the Wang Besar area near the Sungai Lencongan Barat. And for the information of YB Deputy Minister, two or three days ago I already discussed and raised the matter of the Sungai Lencongan Barat in relation to Kampung Wai. This Kampung Wai is good for tourism activities, but the cost of its loss, saltwater entering the Sungai Lencongan Barat, that is what has happened. Mr Chairman, I would also like to seek clarification regarding the flood mitigation project in the Perlis River Basin. So, based on JPS information from April 2025, this project involves the protection of more than 1,500 residents, including residents in Wang Besar and the surrounding areas. This project aims to shorten the distance of the tidal water flow from 12 kilometres to 3.3 kilometres. So, my question is, does the design of this project also take into account the risk of seawater intrusion from the river mouth and its impact on water quality in the upstream areas and the connected drainage system? So, I humbly request the ministry
explaining whether the West Diversion River has adequate control systems such as water control gates, pump houses and tidal control structures, and monitoring of water salinity. From Item 14500, will the ministry consider allocating specific funds to address the problem of seawater intrusion and to upgrade the drainage system in the area concerned? Mr Chairman, I move on to Item 15000 – Minor Works JPS, Various States. The budget is RM103 million. There are several areas that need upgrading. First, rehabilitating the collapsed riverbanks from Sungai Siran to Sungai Lencongan Barat, which have been eroded by floods. Second, upgrading the flood barrier banks that were damaged by water overflowing during floods around the Bukit Bintang area to Gua Jentik. Third, rehabilitating the water control gates at Sungai Lencongan Barat to Sungai Kurung Batang, which have been damaged, and the inflow into the paddy fields in the Kampung Belangga Pudak, Bintong bendang area, which has caused flooding. Fourth, upgrading the drain or water channel on Jalan Dato' Ali, which often causes flash floods in the area, especially near Sekolah Menengah Kebangsaan Dato' Ali. Fifth, rehabilitating the estate roads, especially Jalan Harumanis Hutan Ketiau and also estate roads that are easily damaged, even though they have been tarred, especially the back road behind Ana Burger shop, Bintong. These estate roads are actually used to access residential homes. So, I earnestly request JPS to help with the problem of these estate roads, especially in Kampung Hutan Ketiau. The residents here are pitiable, because their road–– they do not have an alternative road. And lastly, I request a more orderly drain leading to SK Abi school. That is all from Kangar, thank you.
Thank you, Honourable Kangar. I invite Honourable Beruas.
Thank you, Madam Chairman, for allowing me to debate at the Committee stage of the Ministry of Energy Transition and Water Transformation (PETRA).
I wish to raise two matters. The first is Item 020000, namely Energy Management. The government is now reconsidering the use of nuclear power in Malaysia. I hope that before we shift to nuclear energy, we must maximise renewable energy in Malaysia, especially solar power generation. I have received complaints that solar power generation cannot sometimes be expanded because the main incoming substation (PMU) is already full, as in the areas of Alor Pongsu and Bagan Serai in the state of Perak. We could also generate more solar energy in–– especially in the East Coast states, where we have very large areas of land, and if the government can build more of these PMUs, we can use those lands to generate more solar electricity. And if we compare generating one gigawatt of solar electricity, we need only about RM2.8 billion, and in the committee yesterday, Members of the Parliamentary Committee were informed that to generate one gigawatt of nuclear energy, we need USD6 billion or about RM24 billion. So, it is more than sufficient if we can still prioritise solar energy generation. One concern raised is that the land used for solar will take up a large area. I ask the government to provide a design for the public so that when an area of land is used to generate solar energy, we can still carry out agriculture beneath the solar panels, whether by growing plants that can survive under solar panels or by rearing animals, or as I saw in China, where they dig the land to farm fish. So, we can have multi-use of that land. The second matter I wish to raise is Item 030500 – Department of Irrigation and Drainage (JPS). Mr Speaker, at the mouth of Sungai Beruas in Pantai Remis, the bunds and mangrove trees that protect the fishermen's jetties at the mouth of Sungai Beruas have eroded. As a result, strong waves from the sea will hit these jetties directly, making it dangerous to work on them.
Officials from the PETRA ministry have visited the area and have informed us that they can allocate RM1 million for the project. But it is indeed not enough, as one fisherman put it, it is like, "throwing salt into the sea".
This means we need a fairly large allocation, and I request the Minister to study this problem and allocate sufficient funds so that a barrier against the waves that are hitting the area can be built as quickly as possible. Thank you, Madam Chairman.
Thank you, Honourable Beruas. I invite Honourable Setiu.
Assalamualaikum warahmatullahi wabarakatuh. Mr Chairman, I move on to Item 16700 – Urban Flood Mitigation and Drainage Plan. Mr Chairman, the first matter concerns the Setiu River Flood Mitigation Plan Phase 1. Every year, Bandar Permaisuri, from Petronas Sungai Tarom to Mini Stadium Sungai Tarom, is submerged by one to two metres of water. In 2015, KPS applied for funding for this FMP project but it was not approved by EPU. Eleven years have passed, and the people of Setiu are still waiting. The Minister informed that the Second Rolling Plan for 2027 has 15 new flood mitigation projects. My question is, is the FMP for Sungai Tarom, Setiu– is the FMP for Sungai Setiu Phase 1 included in these 15 new projects? What is the status of its approval and implementation? The second matter is the drainage system in Kampung Alur Damat, Batu Rakit, Kampung Wakaf Tengah and the surrounding areas. These areas are low-lying and their drainage system is imperfect, so flash floods frequently occur. I raised this issue in the Special Chamber on 23 July 2025. Temporary works have been carried out, but this problem requires a comprehensive solution. My question is, what is the status of the project to upgrade the drainage system in this area? Has it been applied for and approved under the Second Rolling Plan of RMK13? The next item is Item 15300 – Dredging of River Mouths. Thank you, the Setiu Estuary Conservation Project was completed on 1 September 2026 and handed over to the state government. However, the project cost was reported to have increased from RM116 million to RM137.53 million. Beach nourishment works were also reported to be needed again in about five years only. My questions are, first– what is the reason for the difference in cost of this RM21.53 million? Second, after it is handed over to the state government, who will bear the cost of maintenance projects and beach re-nourishment? Third, does the ministry agree with my proposal in the Special Chamber in the previous session to expand the scope to dredge the fish cage zone and sandbars in the Lagoon, Setiu. Item 15100 – Coastal Erosion Prevention. God says in the Quran [reciting a verse of the Quran] – "Corruption has appeared on land and sea because of what the hands of people have earned, that He may let them taste part of that which they have done, so that they may return". I find that the coastal erosion project at Kampung Pangkalan Maras in Batu Rakit, which is still not completed, where coastal erosion at Pantai Batu Rakit has occurred due to sea reclamation for the airport view previously. The impact is very large, and it is possible that after the breakwater project at Pangkalan Maras is completed, coastal erosion will continue to occur all the way to Kuala Merang. That is why I feel the ministry must assess and take into account the views of technical departments before starting or approving such a major project. Mr Speaker, Mr Chairman. Fourth, Item 15000 – JPS Works. Where there has been a reduction from RM11.13 million to just RM3.84 million. The monsoon season has started. Water stagnates for long periods because rivers and drains have not been cleaned. The Minister himself acknowledged that emergency funds exist, but they are limited. I propose that the ministry prepare sufficient emergency funds for river and drain cleaning, channelled to district JPS offices before the monsoon season. My question is, does the ministry agree with the 602 river conservation projects. Of the RM602 million River Conservation Project, how much is allocated to the Setiu district for 2027? Finally, Mr Speaker.
Time is up. Thank you, Honourable Setiu. I invite Honourable Tuaran.
Thank you, Madam Yang di—
Madam Chairman. Tuaran also debates the Ministry of Energy Transition and Water Transformation, at the Committee stage for the purpose of Supply B.33 and Development P.33. Tuaran would like to begin with Item 02000 – Energy Management and Item 4100 – Sabah Electricity Supply. Madam Chairman, in Peninsular Malaysia, with the very strong investment in data centres, and as reported, the reserve margin in Peninsular Malaysia has already fallen to around 23 per cent. That is down from 40 per cent previously. Meanwhile, in Sabah, at this time the reserve margin is about 20 per cent, and by the end of this year it is expected to increase to 26 per cent. And in such a situation, when data centre usage, energy for data centres in Peninsular Malaysia, is very high, the government has restricted and no longer allows further data centre investment in Peninsular Malaysia. As a result, these investors have come to Sabah. When they come to Sabah and it has been announced that they will– they will open data centres in industrial estates such as Taman Perindustrian Kota Kinabalu. The issue here is that we have only just increased the reserve margin. If more data centres come, it will drop very sharply. The question here is where is the coordination in terms of federal and Sabah policy? We know that electricity matters are now regulated by the Sabah State Government, and it has the Sabah Energy Council to regulate and so on. But is there no coordination in terms of this investment, because these are the investors who are coming? So we too are worried if certain policies are not imposed to regulate. Do not let the electricity or energy that we generate in Sabah be used by data centres and not for people. Another important matter is with the increase in gas prices and so on, and this uncertainty. So in Peninsular Malaysia, for about a year already, an automatic fuel adjustment has been introduced in terms of tariff setting and so on.
But in Sabah, the imbalance cost pass-through or ICPT, yes, is still used for determining tariffs by taking into account the uncertainty of fuel prices, especially gas and so on. The question here is again in terms of coordination. Although we are regulated by different commissions. In
Peninsular Malaysia by the Energy Commission, in Sabah it is regulated by the Sabah Energy Commission. But where is the coordination? We need to understand why there is this difference. And ultimately it will be translated into tariffs, or tariffs to consumers. And when it reaches consumers, matters of affordability arise, and that is where all the various questions arise when these tariff matters are imposed. And in that regard, Tuaran would like to ask– how, and to what extent, is our communication strength to provide explanations about the various changes that happen, in terms of tariffs and so on. On this occasion too, Tuaran would like to ask about the tariff support subsidy provided by the Federal Government to Sabah Electricity. How much, with the tariff increase imposed earlier this year on Sabah to 39.7 sen per kilowatt hour? So, how much more tariff support subsidy does Sabah Electricity need? And is this given on time? On this occasion too, Tuaran would like to ask about the implementation performance of the Southern Link project, namely the grid connecting from Sipitang to Tawau. Madam Chairman, I move on to Item 28000 – Sabah Water Supply Plan. Under this item, RM165,604,000 in the form of loans to address water supply matters in Sabah, especially in the construction of water treatment plants and so on.
Yes. We know that in water matters, this is a state matter. What I want to know is to what extent the implementation of federal projects in Sabah to address water matters can tackle the various problems faced by Sabah, because in Sabah, the reserve margin for water is negative. Yes, negative. And in terms of non-revenue water it is also very high, exceeding 60 per cent. So in this matter, I see in this item that allocations to Sabah are very high, even though in the form of loans. But I want to know, to what extent will it be implemented and what will be its effects? Will this further reduce non-revenue water, the non-revenue water rate, and can it increase the reserve margin in Sabah's water supply system? Thank you.
Sila gulung.
Thank you, Mr Chairman, for the opportunity given to me to take part in debating the budget for the Ministry of Energy Transition and Water Transformation (PETRA) this evening. The first matter I want to mention is under the Department of Irrigation and Drainage (JPS), amounting to RM3.2 billion, especially under Item 16700 – Flood Mitigation Plan (RBT) and Urban Drainage. If the previous budget was RM927 million, this time it is RM1.44 billion. I support this increase in budget because there is a need to ensure that RBT throughout the country is always given top priority, and together we ensure that the frequency of floods can be reduced everywhere. I want to take the opportunity this evening to mention two matters, two projects in my area, which I am confident the Honourable Deputy Minister who is in this House certainly knows. I have mentioned this matter repeatedly in this House. The first concerns the Integrated River Basin Development (PLSB) Sungai Linggi Phase 5, which is currently under way. I thank JPS, which I see is very committed in ensuring contractors carry out their duties. Regarding this PLSB Sungai Linggi Phase 5, I want to know the latest status of the project on the ground, because we want to know whether its status is proceeding smoothly, whether there are delays, or whether it is ahead of schedule compared with the original plan. And what is the total cost, is it still RM200 million as at the beginning? And the most important question is when can it be completed? We hope everything goes according to schedule, and that a large part of the Rasah Parliamentary constituency, especially all residential areas along the Sungai Linggi corridor, can avoid the disaster of floods in future. And the same item, another important river in the Rasah Parliamentary constituency, Sungai Jijan. This river passes through Kampung Jijan, a village area that often floods when there is heavy rain. And I have raised the matter of the flood mitigation plan (RTB) for Sungai Jijan repeatedly since three or four years ago, because we do not want the villagers who
Thank you, Honourable Member for Tuaran. I invite the Honourable Member for Rasah.
Thank you, Honourable Chairman, for the opportunity to take part in debating the budget for the Ministry of Energy Transition and Water Transformation (PETRA) this afternoon. The first point I want to raise is under the Department of Irrigation and Drainage (JPS), amounting to RM3.2 billion, mainly under Item 16700 – Flood Mitigation Plan (RBT) and Urban Drainage. The previous budget was RM927 million, and this time it is RM1.44 billion. I support this increase in the budget because there is a need to ensure that the RBT across the country always receives primary attention, and that together we ensure the frequency of floods can be reduced in all places. This afternoon I want to take the opportunity to mention two matters, two projects in my area which I am confident the Honourable Deputy Minister who is in this House certainly knows. I have mentioned these matters repeatedly in this House. The first concerns the Integrated River Basin Development (PLSB) for Sungai Linggi Phase 5, which is currently under way. I thank the JPS, which I have seen to be very committed in ensuring the contractors carry out their duties. Regarding this PLSB Sungai Linggi Phase 5, I want to know the latest status of the project on the ground, because we want to know whether its status is proceeding smoothly, whether there is any delay, or whether it is ahead earlier than the original plan. And is the total cost still RM200 million as at the beginning? And the most important question is when can it be completed? We hope everything goes according to schedule, and that a large part of Parlimen Rasah, especially all the residential areas along the Sungai Linggi corridor, can avoid flood disasters in the future. And on the same matter, another important river in Parlimen Rasah, Sungai Jijan. This river passes through Kampung Jijan, a village area which, whenever there is heavy rain, certainly experiences flooding. I have raised the matter of the flood mitigation plan (RTB) for Sungai Jijan repeatedly since three or four years ago, because we do not want the villagers who
It has indeed been a long time. For several generations, those living there are still haunted by floods every time there is heavy rain. So I want to ask: I am given to understand that there has been approval and good news from PETRA and JPS. I want to ask the Government when the RBT for Sungai Jijan will receive approval from the Government, when the work will begin, and how long it will take? The second point I want to mention this afternoon falls under Item 85000 – Non-Revenue Water (NRW). I see a high surge in allocation from RM310 million in the previous budget to RM501 million. Yes, there is a need, because NRW is water that is wasted for nothing: it is treated and processed at a cost of chemicals, electricity and so on, and in the end it is simply wasted. The water operators cannot bill it to consumers. It is a loss that we should avoid. I am given to understand that at present, NRW at the national level is around 33 to 34 per cent. Among the best states, I am given to understand, is 28 per cent, Johor. Some reach 50 per cent NRW. This means more than half of the treated water we produce is wasted just like that. That is a very large loss. So I want to ask: is there any comprehensive effort by PETRA itself to ensure that the NRW target of falling to 28 per cent by 2030 can be achieved? Because this is wastage that we should avoid, wastage that we should minimise. So, is there any comprehensive action by the ministry itself to ensure that the 28 per cent target can be achieved by 2030? And the last point, under Item 020000 – Energy Management. I know that the Energy Commission falls under this ministry, and we know that Tenaga Nasional Berhad, a major Government-linked company (GLC), is the main electricity supplier to consumers. What I want to raise this afternoon is that we often hear issues concerning meter tampering. When there is, or when TNB suspects there is, meter tampering at a consumer's premises, TNB should go to the premises in the presence of the account owner or the account owner's representative when the old meter is opened and a new meter is installed. That is the best way to avoid any misunderstanding or problems that arise later.
But it often happens that a TNB representative or technician goes to open the meter when the house owner is not there. So it is not witnessed. So, the next day, once the meter has been opened, TNB takes it away, makes a claim for meter tampering against the consumer, and the consumer disputes it. Eh, who put this, this...
Sila gulung.
30 seconds. This, this particular substance or particle in the meter. So a situation arises that is unfair to the consumer. Because if the consumer is a witness when the technician opens the meter and a new meter is installed, and there was indeed tampering with the old meter, it would be easy for TNB to claim. So I request that the Government give TNB a clear directive not to do this again. Let us do it in a harmonious way. Whoever is wrong is wrong. I am not saying I am teaching people to tamper with meters. It is just that we should do it the right way to avoid continuing misunderstandings. That is all from me. Thank you, Madam Chairman.
Thank you, Honourable Rasah. I invite the Honourable Pokok Sena.
Assalamualaikum and greetings of peace. Madam Chairman, Item 030100 – Water Resources Management. Madam Chairman, I wish to touch on the issue of water resources between Kedah and Penang in particular. Based on data from the Kedah State Water Resources Board, approximately 84 per cent of the total water supply in Penang is sourced from the Muda River in Kedah. Water from the Muda River will be treated at the Sungai Dua Water Treatment Plant before being supplied to all consumers in Penang. In fact, consumption in Penang is also higher than the domestic consumption of Kedah's own people. Madam Chairman, the issue here is the absence of balanced consideration in this matter. First, Kedah has to bear high costs to preserve the sustainability of its river in the upper reaches. Second, Penang uses its resources without any charge or payment. So these two are not balanced. Therefore, I am of the view that the ministry should step in as the intermediary to resolve this matter with more equitable consideration. Accordingly, I would like to seek certainty.
First, what mechanism can be formulated at ministry level to ensure that an inter-state water supply agreement is fairer, taking into account domestic needs and obligations first before the water is transferred to the receiving state. Second, what direct benefit should the supplying state fairly receive in a controversy of this kind? I am also of the view that the ministry should appropriately raise this issue as a catalyst for formulating an inter-state water trading policy involving the principle of fair distribution of resources, appropriate pricing structures, and protection of the interests of the supplying state, so that both states are in a win-win situation in addressing this issue. Madam Chairman, Item 13500 – Dam Rehabilitation. I wish to touch on the safety of dam structures. I wish to know the current risks and monitoring of high-risk dams, such as dams older than 50 years, dams with a height exceeding 100 metres, dam lengths exceeding 1,000 metres, and reservoir capacities exceeding 50 million cubic metres, as well as downstream flows of dams passing through residential areas. I understand that the Government has set up the SPAN monitoring display that monitors directly the latest situation of 43 major dams across the country. However, I would like further explanation on, first, what form of periodic safety assessment is carried out by the ministry in view of the current risks and structural strengthening of high-risk dams. Second, what form of latest risk assessment is regulated under the ministry, apart from the cooperation formed with state governments; and third, has the ministry itself prepared an early warning protocol as a precautionary measure against any possibility involving NADMA or state government authorities? Please explain. Madam Chairman, Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. I would like an explanation of the current status of the RTB Sungai Nawar project, Pokok Sena. Sungai Nawar is among the rivers that need attention in efforts to tackle flood problems in the Pokok Sena Parliament. River overflow during heavy rain has the potential to endanger residents' safety and cause losses to the agricultural sector. For example,
on 4 October 2025, Sungai Nawar recorded a water level of 10.54 metres, exceeding the danger level of 10.39 metres. I request a little more time.
Sila gulung.
In the same flood incident, 200 residents from 50 families had to be evacuated. On 18 November 2025, JPS Kedah also listed Sungai Nawar as one of the flood hotspot areas in the state of Kedah. The information I received is that the land survey work— the survey work has been completed to obtain data for preparing the Pokok Sena drainage master plan study. So my question, Madam Chairman, is whether the proposal to construct the RTB Sungai Nawar has been considered in the RMK13 Rolling Plan? Thank you.
Thank you, Honourable Pokok Sena. I invite the Honourable Wangsa Maju.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Madam Chairman. Clear water flows calmly, Flowing swiftly to the estuary yonder; Respectful greetings, esteemed Madam Chairman, Wangsa Maju rises to speak. Regarding Item B and P.33, the Ministry of Energy Transition and Water Transformation (PETRA), which is allocated RM5.33 billion for 2027, an increase from RM5.19 billion in 2026. I will raise not many points, only five questions regarding the appropriateness of the expected output compared with the allocation received. First, the flood protection target. In 2025, expenditure by the Drainage and Irrigation Department (JPS) of RM2.07 billion succeeded in protecting 200,000 residents. For 2027, JPS's allocation exceeds RM3.2 billion, but its target is to protect only 100,000 residents. The allocation rises by more than 50 per cent, but the number of residents protected falls by half. I understand that flood mitigation projects take years to complete. Therefore, I request that the ministry state how many projects are scheduled for completion in 2027 and how many residents will be protected once all existing projects are completed?
Second, energy transition, and it seems— which seems to have stalled. The actual renewable energy capacity in 2025 is 13,300 megawatts. The targets for 2026 and 2027 remain at 14,000 megawatts. But the percentage of renewable energy capacity is targeted to rise from 32 per cent to only 33 per cent. The ministry needs to explain how this happens. In terms of allocation, the energy management programme, sustainable energy activities, and energy efficiency and renewable energy programmes, all three receive only about RM28.6 million. However, savings under the policy and the National Energy Efficiency Action Plan 2026–2035 are targeted to surge from 0.3 per cent to 21.1 per cent, which is about 70 times. This rises from 4,500 to 12,000 terajoules. Madam Chairman, on what basis is this energy saving target set, when the allocation is so small? Third, abandoned water supply projects. The inter-state water conveyance project is worth RM3.93 billion, but expenditure in 2025 is only RM4.4 million and the allocation for 2027 is only RM2.1 million. The Perak Water Supply Scheme worth RM1.7 billion recorded zero expenditure in 2025. The ministry's project costs reach RM91.2 billion, but the development allocation is around RM4.9 billion a year. At this rate, all of them will need more than 18 years to complete. The ministry should table a clear list of priorities. Fourth, Non-Revenue Water (NRW). More than one-third of the nation's treated water, namely 34.4 per cent, is lost just like that. The national NRW allocation increases to RM500 million, but the target only falls to 31.8 per cent by 2027. This rate is far too slow compared with the economic cost borne by the people.
Fifth, dependence on loans and reclassification of expenditure. The loan component increases from RM450.7 million to RM549.9 million. Sabah's water supply depends entirely on loans of RM165.6 million, while Sarawak's is RM55.8 million. Why are these two states still dependent on loans? That is one question. The objects for services and supplies for development surge from RM471 million to RM3.44 billion, while the objects for assets fall from RM4.22 billion to RM1.04 billion. Changes of this magnitude need to be explained so that the House is confident that development money produces physical assets.
Madam Chairman, I support the ministry's efforts. However, I urge the ministry to review its KPIs so that they are in line with the expenditure spent using the people's money. Thank you.
Thank you, Honourable Wangsa Maju. I invite the Honourable Shah Alam.
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace. Greetings of Malaysia MADANI. Thank you, Mr Chairman. I now go straight to the Budget Estimates 2027 for Development Purpose P.33, Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, amounting to RM1.44 billion, and Item 16800 – High Priority Flood Mitigation Projects, amounting to RM1.032 billion. Madam Chairman, I wish to bring the ministry's attention to the situation of repeated flash floods in the Shah Alam Parliament area, particularly around the Shah Alam Toll Plaza, the NKVE Highway, Section 13 and the i-City area. The flash flood at the Shah Alam Toll Plaza last week, which lasted for two consecutive days, caused the NKVE Highway to be impassable to vehicles for almost two hours. This situation not only caused serious traffic congestion, but also disrupted the movement of thousands of road users using the NKVE, ELITE and also GCE routes. The question is, how can an area that is one of the main gateways into Shah Alam and has strategic importance to the Klang Valley transport network repeatedly face flood problems like this? This is the challenge we face, Madam Chairman. Although these floods occur everywhere, in Kedah there are floods, in Perak there are floods, in Penang there are floods, Kelantan has floods, Terengganu, Pahang, but when Shah Alam, this Klang Valley, is mentioned, the whole of Malaysia is in an uproar. Madam Chairman, I am very aware that the flood incident at Kampung Melayu Subang, the Shah Alam Toll Plaza area, Section 13, is related to the alignment of the Sungai Damansara Flood Mitigation Plan, which is being implemented at an overall cost of around RM481 million. This project is indeed important for addressing flood problems comprehensively through the construction of flood walls,
retention ponds, high-power pumping stations, and river deepening and upgrading works— "bernaik", is it not. Sorry. Upgrading of the river. I have been informed that this project is being implemented in phases starting from the mouth of Sungai Damansara up to its upstream, across Petaling and Shah Alam Districts. Alhamdulillah, some projects that have been implemented have resolved several hotspots in Shah Alam. For example, at Padang Jawa, at Kampung Kebun Bunga, and at Batu 3 Commuter Station. Alhamdulillah, we no longer hear of floods in these areas because these flood mitigation projects have been completed, but for the Section 13 area, floods still occurred last week. I thank PETRA for giving priority to this area. Right now, a project is starting to build a retention pond of seven acres, Madam Chairman. Like a lake, and around it there will be a recreational space, making it a very beautiful area when completed. But please be patient, residents of Shah Alam. However, I would also like to raise three matters for the attention and action of the ministry. First, immediate mitigation measures. While the Sungai Damansara RTB project is being completed, we cannot just wait until the whole project is finished in 2029, because the highway routes must be used and the people must not be disrupted by the flash floods that are happening. So I request, what immediate measures and priorities must be given by the Drainage and Irrigation Department, PETRA, to overcome the flash floods that occurred at the Shah Alam Toll Plaza so that the NKVE, ELITE and GCE junction can be passed? Second, coordination of drainage systems between development areas and highways. I draw the ministry's attention to the fact that flood problems cannot be viewed based on administrative boundaries alone. I request that government agencies: JPS; local authorities (PBT); Public Works Department (JKR); and PLUS, as well as developers, must sit down and look at these hotspot issues as a whole. And importantly, I would urge JPS in particular, in development plans, that applications for any development must be firm in refusing approval for any development that does not comply with drainage and stormwater conditions. They must have the courage to say "No". Do not approve something just because there is pressure from any party.
So, those are the three matters I wish to mention, Madam Chairman. And finally...
Thank you, Honourable Shah Alam.
I want to recite a pantun, Madam Chairman, a little. A little, thank you. Just a little. A maiden in Pekan Tampin, A widowed mother in Pekan Pontian; Be moderate when campaigning, Do not carry it into the House. That is all, thank you.
Thank you, Honourable Member. I invite the Honourable Kapar.
Thank you, Deputy Chairman. Bismillahirrahmanirrahim. Kapar wishes to debate the Supply Bill of the Ministry of Energy Transition and Water Transformation (PETRA), Operating Head B.33 and Development Head P.33. Item 020100 – Electricity Supply. Regarding the data centre of nearly 2,000 acres to be established in Kapar. So, the people of Kapar want to know, how many megawatts of electricity are required for the entire data centre? And will TNB need to build new substations and upgrade the grid? And what guarantee is there of electricity tariffs and supply stability for existing residents and industries that are not affected? Then, we in Selangor are already full of flood water. One issue that is increasingly worrying in the Kapar Parliament area is the increasingly widespread, recurring flooding that is not limited to low-lying areas only. B.33 Item 030500 – Drainage and Irrigation Department (JPS), RM141 billion and P.33 Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, RM1.4 billion. P.33 Item 16800 – High Priority Flood Mitigation Projects, RM1.031 billion. Within the last two days, heavy rain has caused several areas in all three State Legislative Assembly (DUN) seats within the Kapar Parliament to be submerged in water, including right now. What is even more worrying is that areas that previously never experienced flooding have also started to be inundated. This gives a signal that we are facing a change in the pattern of flood risk that
requires a more comprehensive water management approach. Kapar is located in the west coast area of Peninsular Malaysia.
We need to take three matters, three main factors. Heavy rain of high intensity that increases surface water runoff; rising sea levels that may make it difficult for river water and drainage systems to discharge into the sea at high tide; and rapid development that changes catchment areas, increases impermeable surfaces and puts pressure on the capacity of existing drainage systems, especially when drainage for new projects is not properly provided. So, we can no longer look at the Kapar flood alone, or the problem of clogged drains alone. It is an issue of river basin management, urban drainage, land-use development and the influence of tidal changes, which must be addressed in an integrated way. So, I appreciate that the government has approved the RTB project for Sungai Kapar Kecil and Sungai Kapar Besar at a cost of RM219 million, starting January 2024 and expected to be completed in May 2029. That is a long time away, and according to the official Parliamentary answer, physical progress as of 31 January 2006 was only 28.4 per cent. The question is, will this project truly protect the high-risk areas in Meru, Sementa and the surrounding areas? Now the Klang Strait has also flooded. Does the RTB design take into account large high-tide phenomena and rising sea levels? Sea levels have indeed risen. Is the capacity of the pump house, the water control gates or this barrage sufficient to prevent river water from overflowing again into residential areas at high tide? I do not want us to measure success only by the percentage of construction progress. The success of the RTB must be measured by the reduction in flood incidents and the real protection of residents. Meru experiences flash floods that recur. Residents should not continue to be victims every time there is heavy rain. So, while waiting for 2029 for the RTB to be completed, I propose, please respond. Audit the capacity of the main drainage and stormwater systems in flood hotspot areas. Carry out deepening and cleaning of rivers and drains regularly and proactively. Add retention ponds and pump systems at locations identified technically. Inspect water control gates and discharge structures to prevent backflow at high tide.
I want to raise one issue concerning the area around the Kapar Commercial Hub construction site.
Sila gulung.
The fact is— Okay, this is the winding-up, Chairman. This area has experienced recurring floods even though the development project is still under construction. The drainage system should have been provided first, not completed according to development needs. So, it raises serious questions about compliance with conditions, development approval, drainage plans and control of surface runoff. So, I ask PETRA, through JPS, to work with the state government and the local authority to carry out a technical audit of the drainage system at the development site, to investigate whether the approved drainage plan has been complied with, and to ensure that the temporary retention ponds and drainage system are functioning before the development proceeds to the next stage.
Thank you, Honourable Kapar.
In principle, never, never, never transfer flood risk to existing residents. Thank you, Chairman.
I invite the Honourable Ampang.
Thank you, Honourable Madam Chairman. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi taala wabarakatuh, greetings of peace. I wish to raise the need for the government to give more serious attention to the maintenance of the national drainage system, especially in addressing flash floods. We have heard the majority of Members of Parliament speak about this matter, but I want to remind this House that there is one existing Act, namely the Street, Drainage and Building Act 1974, which is Act 133. This Act, under the local authorities, places responsibility for the construction and maintenance of drainage systems. However, the Act does not stipulate an obligation to provide allocations. This, Madam Chairman, is the missing piece that we see here. If we look carefully at the current budget, we do not have a specific Act like the one we have for MARRIS.
MARRIS has its Act, and all roads in Malaysia have a determination that, once made, requires a specific budget to be provided every year. So, I propose here that we have the same mechanism for drainage. For example, we could name it the National Drainage System Maintenance and Management Act. Why do I say this, Madam Chairman? I see in the items there, the budget allocated varies according to the year. Some go up, some go down. This year we see Item 14500 – Upgrading of Urban Infrastructure and Drainage has decreased. Yet it started at RM44 million, and now it is only RM23.2 million. Item 15200 – Repairing, Cleaning and Rehabilitating Rivers and MASMA Infrastructure has also decreased. So, this cannot continue. Because when we build drains and drainage systems, and there are rivers and monsoon drains, it is the government's obligation to maintain them or ensure they are in good condition, because they hold water that prevents areas from flooding. So, I emphasise here that we need a new Act, which we name the Drainage System Maintenance and Management Act. Then there will be no more fighting over money. It is the government's obligation every year to set aside a clear fund according to the existing inventory. Kapar asks for this to be audited, but actually there is no need. Every drain and every drainage system in Malaysia should have been inventoried, but what is lacking is the money to maintain them. So, I hope we no longer see these matters as emergencies, but I request that all drainage, earth drains, monsoon drains, drains in housing estates, including rivers, be included in this new Act. That is the first point, Madam Chairman. The second, concerning Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation, 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, 16800 – High Priority Flood Mitigation Project, I want to speak a little about Ampang. We see that Ampang has experienced several flash floods. This year there were some, and last year there were some, but I request that the government provide me with the full list of how many flood mitigation and drainage upgrading projects there actually are in the Ampang Parliamentary area, because we see there are some contradictions.
For example, JPS Gombak and Hulu Langat only list Jalan Chong Khoon Lin as a flood-risk area, and no other flood hotspot. Yet under the SDG Implementation Assessment Report, with permission, several other areas are listed, such as Bandar Baru Ampang, Kampung Baru Ampang, Kampung Melayu Ampang and Lembah Jaya North and South, including Kampung Bukit Sungai Putih. This is the difference, because perhaps the KPIs or terms of reference, with permission, are applied differently. So, I hope they will be standardised. On the second point, I also want to state here, what flood warning broadcasts do we make to residents? We may have sirens and so on. I was puzzled when I went to Hong Kong. Hong Kong is also a hotspot for earthquakes or storms. I went there, I was an outsider, but I received an SMS alert. This means everyone in the area at risk immediately receives it. Whether you are a resident or a tourist, you receive it. So, perhaps this too can be considered so that flood hotspot areas and their users can be informed of this matter. The next point, just a little more. What is the latest status of the deepening and widening works of the rivers surrounding the Ampang Parliamentary area, especially Sungai Ampang, Sungai Kerayong and Sungai Kongsi Lapan? And has the existing drainage capacity in Ampang been properly improved? Because Dato'— Mr Chairman, Madam Chairman, because Ampang has been like this for 40 years, a long time, this residential area of theirs. So, I hope it can be identified and eventually improved. Thank you, Madam Chairman.
Thank you, Honourable Ampang. I invite the Honourable Merbok.
Thank you, Madam Chairman. Assalamualaikum. I will go straight to Item B.33, 040300 – Electricity Bill Subsidy. I want to debate just one item, namely RM55 million. I would like to take the opportunity to appreciate the government's efforts to provide subsidies to help the people cope with the cost of living. However, my question is to what extent this subsidy allocation is truly effective and reduces
the burden of household electricity generation, especially for groups that have high electricity consumption. Madam Chairman, I would like to draw the committee's attention to an actual electricity bill for November 2026 that I am showing here. [While showing a copy of the document]
This bill shows electricity consumption of 1,537 kilowatt hours with a monthly usage charge of RM901.99 before tax and other charges. [Tuan Suhaizan bin Kaiat (Pulai) chaired the Committee] What caught my attention is the structure of the energy charge calculation. For domestic tariffs, consumers who use up to 1,500 kilowatts are charged at a rate of 0.2703 sen per kilowatt. However, when consumption exceeds 1,500, a rate of 0.3703 is charged to that consumer. My question to the ministry and also to the Energy Commission is why, when consumers exceed the 1,500 threshold, this higher rate is charged on the entire consumption and not only on the excess usage? In the example bill I presented just now, the consumer used 1,537 kilowatts. If the first 1,500 were kept at the rate of 27 sen and only the excess of 37 kilowatts were charged at 37 sen, the total energy charge would be approximately RM419, but under the current calculation method, the consumer is charged RM569.15. This means there is a difference of RM150 on the energy charge component alone. I want to stress that my proposal is not that consumers should be free to use electricity without control. Rather, we need to ensure the tariff structure is fairer, reasonable and does not penalise consumers who only slightly exceed one usage threshold. Madam Chairman, I would like to propose that the Energy Commission review the electricity tariff calculation mechanism on a progressive basis. The principle is simple. First, keep the rate of 27 sen for consumption up to 1,500 kilowatt hours. Second, if consumers exceed 1,500 kilowatt hours, the rate of 37.03 sen is charged only on the additional units exceeding that limit.
Third, avoid a mechanism that causes the entire monthly consumption to be charged at a higher rate simply because the consumer has crossed the usage threshold. This approach is fairer to consumers and encourages energy saving without imposing an excessively large tariff penalty on households. Madam Chairman, I would also like to touch on the policy of electricity subsidy protection up to 800 kilowatt hours announced by the government. I appreciate the government's decision to raise the protection level from 600 to 800 kilowatts. However, we must understand that this protection provides exemption from the AFA component, retail charges and the eight per cent service tax, rather than providing a lower energy rate overall. Therefore, consumers using more than 800 kilowatt hours still face a fairly significant increase in their total bill. The question is, is this RM55 million allocation sufficient to address the increase in electricity costs, especially for families with many members, elderly people who need to use certain electrical equipment, and households that must use air conditioners because of the hot weather in our country? Time is not on our side. I would like to move on to several questions for the ministry, the Energy Commission and TNB, namely, what is the total additional revenue from energy charges that TNB obtains through the method of charging a higher rate on overall consumption compared with the progressive tariff method? And how many households benefit from the RM55 million subsidy allocation? And what is the average saving enjoyed by each household? Is PETRA prepared to direct the Energy Commission to review the tariff mechanism so that the rate of 37.03 sen is only charged on consumption exceeding 1,500 kilowatt hours? And is there a protection mechanism for the M40 group who have high electricity consumption because of large family sizes but are not eligible to receive that assistance? Merbok proposes three additional steps, namely that PETRA conducts an annual assessment of the effect of electricity tariffs on households' cost of living. TNB provides bill simulations showing the difference between the progressive tariff and the current tariff so that consumers understand each charge component. The government
considers additional protection for low- and middle-income families with relatively high electricity needs. Finally, I want to stress that electricity subsidies should be an instrument to protect the people, not merely a mechanism to reduce a small component of the bill while the overall cost continues to rise. The people did not ask for free electricity. The people only want a tariff structure that is fair, transparent and does not penalise those who use electricity beyond a certain level. That is all, thank you, Madam Chairman.
Thank you, Honourable Merbok. Next, I invite the Honourable Hulu Langat.
Mr Speaker, before that I want to raise the issue of Standing Order 36(4), which makes it an offence for Members of the House to use impolite or uncouth language or to make sexist statements. Mr Speaker, I have received information that the Honourable Pontian has sent a letter to the Right Honourable Dato' Seri Anwar bin Ibrahim, our Prime Minister, apologising for his lapse in language on 16 November 2026 in Parliament. I would like to ask, Mr Speaker, may I, as a Member of Parliament who stood up and objected to the language used, request, Mr Speaker, the Speaker's Office, and also ask him to come to this august House and apologise to Members of Parliament, especially the Members of Parliament of Pakatan Harapan who heard his speech on that day? Thank you, Mr Speaker. I ask that it be considered.
I suggest that you submit a Motion as usual, Honourable Member, tomorrow.
Thank you, Mr Speaker.
Next, I invite the Honourable Hulu Langat.
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, greetings of Malaysia MADANI, greetings of unity, greetings of rahmah.
Thank you, Honourable Chairman. I go to P.33, 16800 – High Priority Flood Mitigation Project, RM1.032 billion. I have been informed that the Right Honourable Prime Minister, who is currently in China at the APEC Conference, has approved an allocation for flood mitigation projects for the Langat River amounting to nearly RM512 billion. Not billion, million. The Deputy Minister is here. The Deputy Minister earlier already scolded me from afar, didn't he, saying that I should not shout too much. I'm not shouting much, but yes, it's already late in the afternoon, isn't it...
[Speaking without using the loudspeaker] He is good.
Ha?
[Speaking without using the loudspeaker] The Deputy Minister is good.
This one is good, this one is good, this one is excellent. He does not taunt people, he does not mock people. This is the kind of person who deserves it. I want to suggest to the Right Honourable Prime Minister that if there is a Cabinet reshuffle, please appoint Lipis here as a Minister [Applause] I have no problem with that. Here we are in the Cabinet, we taunt, we mock, it is not proper like that, is it. If, say, the allocation is not sufficient, ask for it.
I support, I support.
Like KKDW, you know...
This Deputy Minister is a good person, good. Although...
Like KKDW, you know, he...
Saya sokong
Eh, this Jelutong. Eh, we don't have much time. Like KKDW, you know, he spends more, if the money is not enough, whoever is the Minister or Deputy Minister, I want to say this. If, say, the expenditure is not enough, ask the Right Honourable Prime Minister. Like what he gave to Hulu Langat here, RM512 million for flood mitigation projects. Only, Deputy Minister, I want to ask. The people of Langat are now worried, every afternoon it is raining now. Batu 18 can, Kampung Jawa, Dusun Tua Seberang, the people of Kampung Pak Chat, Rantau Panjang, Dusun Nanding, Taman Sri Nanding, Sungai Serai, Batu 10. Batu 10, the village head there is named Tok
Hanafiah. Just a bit of rain and my WhatsApp starts up. He went to look at the river over there. He became like a guard at the river. He watches whether the water is receding or rising, this village chief. Worried. I just want to ask when this project will begin? The Langat River Flood Mitigation Project is RM512 million. I think I am among the last debaters. I want to ask, because I have debated many times, I am always the last one. Every time, I see the Minister not answering, the Deputy Minister not answering. If possible, on questions like this, I would like the Deputy Minister to answer me first. Do not answer Shah Alam first, even though he gave a pantun just now, about widows and maidens, right. That is fine, no problem. Then, the second point: that is for the long term, but for the short term, what action will the ministry take regarding the riverbanks and the silt, meaning raising the embankment. Then, the small rivers, those small rivers that flow into the Langat River. What steps need to be taken to overcome the problem of flash floods or major floods that occur in this Hulu Langat Parliamentary constituency? In 1970, there was a major flood. Then recently, in 2021, almost 50 years later, there was another major flood, the 2021 one, when the whole country came into Hulu Langat at that time to help the flood victims, but at that time I had not yet become the Member of Parliament for Hulu Langat; I was still Rompin then.
Next, P.33 – Restoration of River Cleansing and Infrastructure. Ha, this is like what I mentioned just now. That is, these small rivers, for the short term, what strategic steps will be taken by this Ministry of Energy Transition and Water Transformation (PETRA)? Just recently, a flash flood occurred at Kampung Sesapan Minangkabau in the Hulu Langat Parliamentary constituency. I want to say congratulations and thank you, especially to the JD. Ha, recently I mentioned the JD JKR...
[Bangun]
This one is the JD JPS (Department of Irrigation and Drainage). His name is Fauzan bin Mat Sabri. He is indeed a good person. Truly excellent. I called him, I WhatsApped him, and indeed the action and work carried out were prompt. He has straightened that river, the Sungai Beranang, and then he raised the embankment too. Then, on this occasion, I also want to say thank you to...
Hulu Langat, may I join in?
The one asking this is Sri Gading. Then, the Chairman is Pulai. Pulai, give a little more time, Pulai. Just now Jelutong interrupted, and the Deputy Minister also interrupted. Please.
Your time is still 5 minutes, Honourable Member.
Please, please, please.
Thank you, Hulu Langat. First of all, I want to thank the Honourable Deputy Prime Minister II, who approved the allocation to widen the bridge in my constituency. There were two applications I submitted, namely Parit Yob and also Parit Yaani Tengah. However, in the Sri Gading Parliamentary constituency there are many villages, many drains, and this causes many— usually when it is the rainy season like this, usually floods. So, I hope the JPS can manage it properly. At the same time, there are several more applications from the people in the Sri Gading Parliamentary constituency, especially to enlarge and widen bridges. Thank you, Hulu Langat.
Thank you, Sri Gading. However, Sri Gading and Pontian, is the distance far or near— near? Is Sri Gading's distance to Pontian far or near, yes?
If you count, it is not that far.
Near, yes. I want to say— no, no. I do not have a pantun today, Shah Alam, right. However, I want to say thank you very much to a TNB officer who has helped me a lot. That's right. The name of this officer is Ahmad Farid bin Abdul Aziz. If he hears this, meaning tonight, he will surely eat ten roti canai, I think. However, I want to say to the Deputy Minister, "Speak by day, look about. Speak by night, listen." Today, I hear he has apologised. Ha, that's good, he has apologised, right, but like what Jelutong said just now, right...
Hulu Langat.
If possible— because he said it in this House.
Honourable Member, your time is up, Honourable Member.
If possible, we want him to apologise to all Members of Parliament from Pakatan Harapan and also the Members of Parliament who support the unity government and also the MADANI Government. Thank you, Honourable Chairman, Pulai.
Thank you, Honourable Hulu Langat. Next, I invite Honourable Seputeh.
Thank you, Mr Chairman. I wish to refer to Item 030000 – Water and Sewerage Management, Item 020000 – Energy Management. Mr Chairman, I understand that the cost benchmarking for water tariffs has not yet been completed. Under the transparent tariff setting process, SPAN may not impose costs exceeding the benchmark on water consumers. Since SPAN has existed for almost 20 years, when will this situation be corrected so that additional costs will not be passed on to water consumers? Mr Chairman, I want to raise the issue concerning data centres that are mushrooming in our country. The establishment of data centres is for the sake of value creation, but until now, we still have not seen how the current model can bring substantial added value to the nation. When these server centres begin operating, they function like a quiet automated warehouse. Each data centre needs only a few technicians, but it sucks up millions of litres of water every day, uses electricity equal to a town, and enjoys tax exemptions for up to 10 years. Mr Chairman, Singapore and Ireland have already learned this bitter lesson. Ireland allowed data centres to consume 23 per cent of its national electricity supply before it was forced to freeze new energy connections and require technology giants to build their own power plants. Singapore, on the other hand, has tightly rationed capacity quotas and tied approvals directly to R&D researchers and the value of the local ecosystem.
My question to the ministry is, what is the state of electricity consumption by data centres in our country? Are data centres using so much electricity that we do not have enough energy supply to distribute to other investments, especially in several places in the state of Johor? Here I want to give some suggestions to the ministry. One is to require hyperscaler companies to co-fund, or we say co-fund, the construction of new power plants and substations from the start, supported by binding take-or-pay contracts so that the people do not bear the cost of idle capacity. The second is to relocate large-scale AI computing centres to the state of Sarawak because its clean hydro power is far greater and cheaper compared with the Peninsula. The third is to liberalise rooftop solar for factories. Abolish the export restriction on rooftop solar systems for factories in Malaysia. Let our factories generate their own electricity during the day so that TNB's existing base load capacity can be distributed to data centres or other manufacturing sectors. Mr Chairman, according to the analysis by PV Magazine, more than 119 cyber incidents were recorded targeting major utility companies worldwide in the period from December 2025 to January 2026. These include Tata Power in India, Taipower in Taiwan, Eskom in South Africa and Iberdrola in Spain. In addition, a coordinated cyber attack targeted more than 30 renewable energy sites, namely wind and solar farms, as well as a power plant in Poland earlier this year. My question is, has TNB prepared itself to face cyber attacks of this kind, given that TNB has previously received direct threats from hacking groups or hacktivists?...
Honourable Seputeh, may I ask for 30 seconds? No, no. In front here. May I, yes?
Ya, sila.
A little? Thank you, Honourable Seputeh. I am not debating, but I want to ask PETRA to explain a budget that has been approved in 2026, this year, the underground dam project in Langkawi. Honourable Seputeh earlier complained about the reduction in tourists to Langkawi, right? I want to ask PETRA to explain the status of this underground dam project, in terms of its continuation, in terms of its design, in terms of its cost, whether it
will be continued or whether there is an independent checker engineer who has already carried out a more comprehensive study. Thank you, Honourable Seputeh.
Thank you, Honourable Sik. Sik's question will be included as part of my speech. Thank you, yes, although PAS. [Laughter]
Thank you.
Thank you, Honourable Seputeh. Next, I invite Honourable Putrajaya.
Thank you, Mr Chairman. Mr Chairman, before I go into the items, I want to reprimand Jelutong a little just now. About that letter, is it true or not, Jelutong, that letter? Check it carefully. Because I observed in the House that day, the Deputy Minister was very confident, very bold. So, you must verify whether the letter of withdrawal is true or not. Because, I observed that it has never happened in history what happened during the winding-up by the Deputy Minister at that time...
[Bangun]
Never mind, Jelutong. I ask Jelutong to verify.
Putrajaya has forgotten the CSA signature, has forgotten?
No. I want to make sure Jelutong checks that letter whether it is true or not, whether Pontian really withdrew it or not. Because, I observed Pontian that day, how very bold he was. So that is why Jelutong should check carefully first, whether he really has withdrawn it or not. Understood, Jelutong?
I hope he withdraws it, Mr Speaker. I hope he withdraws that statement. This news has indeed been broadcast.
The news was broadcast on Astro.
It has indeed been broadcast.
Never mind, never mind Jelutong...
Kecualilah Putrajaya...
Jelutong, Jelutong. I said I think well of Pontian, look at his courage that day. So, before
Pontian had already withdrawn it with the Prime Minister, check carefully. His boldness is different. That is why I asked for that to be checked. Thank you, Mr Chairman. Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage, Item 16800 – High Priority Flood Mitigation Projects, and these two together amount to nearly RM2.5 billion.
Overall, all allocations under the Department of Irrigation and Drainage (JPS) total RM3.205 billion. Mr Chairman, if we look at the flood issue, it has been around since I was a child, this flood issue has persisted for a long time, but what we see happening a lot is flash floods. Among the main causes of these flash floods is related to the irrigation and drainage system and the balance between the development of new areas and the provision of irrigation and drainage systems. I agree with Ampang just now. What happens when there is no balance: new areas are developed, drainage is insufficient, and the allocation for maintenance is also insufficient. So that is why I see, if we take Putrajaya as an example. Putrajaya, thank God, so far we see that cases of flash floods are very rare except when several water drains become blocked. That will be the cause of flash floods. So, I want to take this opportunity to thank the many people who have contributed greatly in planning the development of Putrajaya. A well-organised drainage system and irrigation system have protected this city for more than 20 years. So, thank you to everyone involved in developing Putrajaya in its early stages, including those at Putrajaya Holdings and also those who maintain Putrajaya at the Putrajaya Corporation. That is why I request that the government look comprehensively at the development of drainage and channels, especially for new areas. If old areas already have too much new development, it is even harder to catch up, but what is sad is when home buyers buy houses in new areas with the hope that the area will not flood, but when development around them happens so quickly, there is no irrigation, no drainage, and so those who have just bought houses also have to bear the costs related to this flooding.
Next, Mr Chairman, I wish to touch on Item 020000 – Energy Management. When I was at the Ministry of Education, I requested a comprehensive audit of the suitability of school roofs. More than 10,000 schools across the country should be fitted with solar systems, because we found that among the highest costs borne by the ministry every month are the costs related to electricity and water use. So that is why I request the PETRA ministry to look at ensuring that government buildings in Putrajaya that can have solar systems installed, do it immediately. At the very least, the government sends a clear signal that saving electricity through the use of solar is a priority. I see that new developments in Putrajaya, including newly completed pedestrian projects, were not fitted with solar on top, they used ordinary roofs. We must not let this opportunity slip. That is why I request PETRA to play its role as a ministry to call on all government agencies, departments and bodies to ensure we maximise the potential of electricity from solar, so that we can not only save government expenditure, but also ensure energy sustainability. Mr Chairman, the same goes for Sabah and Sarawak. I request PETRA to look at comprehensive use of solar in the interior, especially in Sabah and Sarawak. When we go down to Sabah and Sarawak, many areas still use diesel generators, whereas solar, apart from its initial cost, the cost of generating electricity is much cheaper than diesel. So, if the government can spend to develop solar areas to provide rural electricity supply in Sabah and Sarawak. I think the people of Sabah and Sarawak will be more grateful to the government. Thank you, Mr Chairman.
Thank you, Honourable Putrajaya. Next, I invite the Honourable Minister to reply for 30 minutes, and it is best to focus on those present in the House. Those not present in the House may submit in writing.
Thank you, Honourable Chairman.
Thank you to the Honourable Members, whether those who took part in the debate or those who did not. First, I would like to record my appreciation and thanks to all Honourable Members who took part in the debate on the Supply Bill 2027 at the policy stage, and who raised various issues and proposals relating to the areas of responsibility of the Ministry of Energy Transition and Water Transformation, or PETRA. Accordingly, the debate at the Committee stage today provides room for the ministry to elaborate on the allocations as well as the implementation of programmes and projects planned for 2027. The ministry will continue to focus on efforts to strengthen electricity supply security, accelerating the transition to sustainable energy, improving the efficiency of water resource management, reducing flood risks, and enhancing water supply and sewerage services for the well-being of the people. Honourable Chairman, for the information of Honourable Chairman and Honourable Members, PETRA has been allocated a total of RM5.33 billion for 2027. An increase compared with RM5.19 billion in 2026. This allocation includes RM403.1 million for Operating Expenditure and RM4.93 billion for Development Expenditure, including RM4.38 billion through direct allocation as well as RM549.86 million through loan financing. This increase reflects the government's continued commitment to strengthening the development of the nation's energy and water sectors. PETRA will ensure that every approved allocation is utilised optimally through effective implementation and monitoring of projects so that the benefits can be felt by the people. Accordingly, I will provide further explanation on the matters raised by Honourable Members at the Committee stage, particularly regarding the implementation of programmes, projects and allocations under the ministry's responsibility. Thank you to Honourable Chairman for allowing me 31 Honourable Members who have debated issues related to PETRA. I will focus on the main issues raised in the energy sector and the water sector before moving on to specific matters according to the time available. According to the number of issues raised
Serta kesuntukan masa persidangan Dewan yang mulia ini, saya akan berusaha untuk memberikan penjelasan secara lisan terutamanya berkaitan pendekatan dasar, hala tuju dan inisiatif utama kerajaan. Bagi persoalan yang memerlukan maklumat terperinci atau status khusus mengenai pelaksanaan projek di kawasan Parlimen Ahli-ahli Yang Berhormat yang tak sempat dijawab secara lisan, kementerian akan mengemukakan jawapan rasmi secara bertulis. Mungkin juga ada ketidakpuasan hati dalam jawapan ini, maka Yang Berhormat boleh juga datang berjumpa terus ke Ministry of Energy Transition and Water Transformation (PETRA) kepada saya ataupun kepada Menteri sendiri, the Honourable Minister, untuk kita bincangkan dalam perkara itu. Honourable Chairman, bagi memastikan penyampaian dalam tempoh masa yang diperuntukkan, isu-isu serta persoalan yang dibangkitkan merupakan salah satu daripada perkara-perkara yang merangkumi dalam jawapan secara berskala. Manakala isu-isu berkaitan dengan kawasan tertentu akan dijawab secara khusus. Bagi sektor tenaga, Honourable Chairman, telah membenarkan kepada saya sebentar tadi yang ada dalam Dewan yang tiada tidak perlu dibangkitkan. Dengan bermula yang pertama adalah the Honourable Member for Puchong. Saya tidak nampak ada dalam Dewan dan pandangan beliau amat baik sekali. Saya mendengar dengan teliti dan catat dengan penuh teliti, tapi beliau tidak ada dalam Dewan. Maka saya pergilah kepada Kuala Nerus. Berhubung dengan hala tuju tenaga berkenaan dengan pelaksanaan tenaga boleh baru dan manfaat kepada rakyat. Bagi menjawab soalan tersebut hala tuju tenaga baharu peruntukan pembangunan tahun 2027, bagi program kecekapan tenaga dan tenaga dibaharui berjumlah RM11.96 juta. Sasaran kapasiti terpasang TBB ini negara pada tahun 2027 ialah 33 peratus.
Sementara sasaran tahun 2030 ialah 35 peratus walaupun kapasiti TBB diunjurkan melepasi 14,000 megawatt pada penghujung tahun 2026. Projek yang sedang dirancang melalui LSS5, LSS5+ tahun 2026. Sebenarnya LSS6 bagi tahun 2026. Projek sedang dirancang melalui LSS ini dan CRESS yang dijangka menambah sekitar 10,000 hingga 11,000 megawatt kapasiti menjelang tahun 2030. Projek TBB berskala besar ini diterajui oleh pihak industri dan sektor swasta. YB Kuala Nerus turut membangkitkan manfaat peralihan tenaga kepada rakyat dan perusahaan kecil dan sederhana di Terengganu.
Untuk makluman Yang Berhormat, kapasiti solar berskala besar yang dipasang di Terengganu adalah sekitar 870 megawatt. Selain itu, melalui Program NEM dan Solar ATAP, kita— kira-kira 65 megawatt pemasangan melibatkan 1,500 pengguna telah direkodkan di negeri tersebut iaitu di negeri Terengganu...
[Bangun]
Kerajaan akan terus menggalakkan penyertaan pengguna domestik dan perusahaan kecil melalui Program Solar Bumbung dan amalan kecapaian tenaga...
Setiu nak tanya sedikit Timbalan Menteri berkait dengan solar ini. Nak tanya tentang Projek SuRIA Home. Daripada RM150 juta yang disalurkan dapat manfaatnya 45,000 hingga 50,000, tetapi yang dapat manfaat hanya 12,000 buah rumah sahaja. Ini disebabkan bahawa pembayaran kena dahulukan dulu. Kena advance dulu, baru rebat dapat. Jadi, menyebabkan golongan B40 tak dapat nak pasang solar disebabkan mereka tak ada duit untuk mendahulukan bayaran. Jadi, adakah kementerian bersetuju untuk melaksanakan satu kuota untuk B40 ini? Yang kedua, saya nak tanya tentang sistem pajakan atau sewa milik. Bila nak dilaksanakan kepada golongan B40 ini? Sekian, terima kasih.
Terima kasih Yang Berhormat yang membangkitkan dan Yang Berhormat sabar sedikit, ada dalam jawapan. Sedikit saja lagi. Ada dalam jawapan yang akan— ramai sebenarnya yang bangkitkan sebentar tadi. Ada dalam jawapan dan saya melihat daripada perkara ini ya, akan ada dalam teks sebentar nanti. Pergi mana ini ya? Berhubung dengan cadangan the Honourable Member for Padang Serai supaya kos pemasangan solar rumah lebih mudah ditanggung oleh B40 dan M40. Program SuRIA Home menyediakan rebat sebanyak RM600 bagi setiap kilowatt sehingga maksimum RM3,000 untuk pemasangan lima kilowatt kepada pengguna domestik Solar ATAP yang layak. Pada masa yang sama, isi rumah digalakkan mengutamakan penjimatan dan kecekapan penggunaan elektrik sebelum memilih pemasangan solar mengikut kesesuaian penggunaan masing-masing. PETRA mengambil maklum pandangan dan cadangan YB Padang Serai bagi pelanjutan program rebat solar sehingga tahun 2027. Dalam hal ini, PETRA akan terus memantau keadaan semasa dan mengkaji inisiatif baharu bagi memastikan semua peringkat penggunaan akan mendapat manfaat daripada penggunaan solar bumbung.
Bagi pembangunan tenaga nuklear negara yang dibangkitkan oleh the Honourable Member for Machang. The Honourable Member for Machang tidak ada dalam Dewan dan juga dibangkitkan tentang perlindungan pengguna penambahbaikan mekanisme tarif oleh the Honourable Member for Padang Serai— disentuh oleh the Honourable Member for Padang Serai dan Puchong. Puchong tidak ada, tetapi Padang Serai ada di dalam. Mengenai bil elektrik serta pengagihan kos kepada pengguna, kerajaan telah memperluaskan perlindungan bil bagi pengguna domestik sehingga 800 kilowatt per jam sebulan berkuat kuasa dari 1 September hingga 31 Disember 2026. Bagi tempoh tersebut pengguna berkenaan dikecualikan daripada pelarasan surcaj Automatic Fuel Adjustment (AFA), Cukai Jualan dan Perkhidmatan (SST) serta caj peruncitan. Bagi tahun 2027, kementerian bersama Energy Commission (Suruhanjaya Tenaga) sedang meneliti cadangan AFA berperingkat yang menggunakan prinsip penyebat kos. Pendekatan ini bertujuan menilai pengagihan kos bahan api secara lebih saksama dan memberi perhatian kepada perlindungan penggunaan domestik serta perusahaan kecil dan sederhana. Cadangan ini masih dalam penelitian dan belum dimuktamadkan. Bagi grid stability dan kejaminan bekalan elektrik di Sabah, bagi the Honourable Member for Beaufort, Kerajaan Persekutuan terus menyokong usaha pengukuhan grid Sabah. Beaufort ada, Beaufort ada? Oh, ada. Ada Beaufort. Agak baca mesej. Tak dengar saya tanya Beaufort ada ke tak. Sayang itu kalau dah bertanya, tetapi tidak mendengar. Bagi the Honourable Member for Beaufort, Kerajaan Persekutuan terus menyokong usaha pengukuhan grid Sabah melalui pembiayaan pembangunan ataupun kuasa kawal selia bekalan elektrik telah diserahkan kepada Kerajaan Negeri Sabah sejak 3 Januari 2024. Di bawah Projek Southern Link, 275 kilowatt fasa pertama dari Sipitang ke Tenom sepanjang 57 kilometer bernilai RM198.3 juta sedang dilaksanakan dan dijangka siap pada tahun 2028. Fasa kedua dari Tenom melalui Kalabakan ke Tawau pula masih pada peringkat pertimbangan peruntukan. Khusus bagi Beaufort, pinjaman mudah sebanyak RM244 juta telah diluluskan bagi Projek Pengukuhan Grid Wilayah Barat iaitu pautan 275 kilowatt antara pencawang masuk utama Beaufort dengan Penampang yang dijangka siap pada tahun 2031. Projek ini akan membantu memperkukuh rangkaian grid dan keboleharapan bekalan elektrik di kawasan berkenaan. Bagi kejaminan bekalan elektrik dan pembangunan pusat data. Bagi persoalan YB Puchong dan YB Balik Pulau. Saya mengambil Balik Pulau— ada? Tentang keupayaan sistem elektrik menampung pembangunan pusat
data, kerajaan terus mengekalkan perancangan yang berdaya harap berdasarkan mesyuarat Electricity Supply Planning and Implementation and Tariff Committee (JPPPET) Bilangan 2/2026 pada 11 November 2026 margin rizab bagi tempoh 2027 hingga 2035 diunjurkan kepada paras 24 hingga 27 peratus. Langkah kawalan permintaan bagi penggunaan tenaga berintensif tinggi termasuk pusat data turut dikenal pasti sebagai langkah mitigasi. Bagi menggalakkan kos pembangunan pusat data dipindahkan kepada pengguna domestik, kadar connected load charge (CLC) telah di peringkat untuk mengurangkan tempahan kapasiti yang berlebihan. Struktur tarif voltan tinggi ultra (UHV) yang berkuat kuasa pada 1 Julai 2025 pula terpakai kepada pengguna pusat data bervoltan melebihi 50 kilowatt. Kementerian turut mengambil cadangan YB Puchong supaya Laporan JPPPET dikeluarkan kepada umum. Sebenarnya soal ini sebentar tadi saya juga telah berbincang dengan Balik Pulau beberapa perkara. Mungkin perkara itu saya beritahu pandangan Puchong juga agak baik dan saya telah berbincang tadi dengan the Honourable Member for Balik Pulau. Honourable Chairman, keutamaan bekalan air rakyat dalam pembangunan pusat data yang dibangkitkan oleh rakan-rakan saya iaitu seterusnya dari Balik Pulau juga, unjuran penggunaan sehingga tahun 2030. Bagi Selangor, Johor, Negeri Sembilan ialah 445.04 juta liter sehari. Bagi mengurangkan penggunaan air terawat, sebanyak 19.5 juta liter sehari air pulih guna telah digunakan daripada empat loji rawatan kumbahan Selangor dan Johor. Melalui garis panduan National Water Services Commission (SPAN), pusat data perlu menyediakan simpanan air sekurang-kurangnya dua hari, mengutamakan sumber alternatif dan menanggung kos penambahan infrastruktur yang diperlukan. Keutamaan bekalan air kepada pengguna sedia ada terus kita terpelihara.
Bagi penggunaan air tidak terhasil (NRW) dan pengukuhan sistem bekalan air juga dibangkitkan oleh the Honourable Member for Balik Pulau dan the Honourable Member for Beaufort mengenai kadar air tidak terhasil ataupun NRW. Kerajaan meneruskan Program NRW Kebangsaan 2025 hingga 2030 dengan memberi tumpuan kepada penggantian paip kritikal dan penyelesaian secara holistik termasuk perwujudan District Metering Area (DMA), pengurusan tekanan serta pengesanan kebocoran yang aktif, program penggantian paip kritikal dan NRW secara holistik melibatkan peruntukan
keseluruhan RM2.52 bilion bagi tahun 2027— RM68.09 juta disediakan bagi kedua- dua komponen tersebut. Manakala RM418.95 juta diperuntukkan untuk program bayaran imbuhan balik kepada operator air yang layak. Sasaran NRW negara bagi tahun 2027 ialah 31.80 peratus. Bagi bekalan air Sabah dan kemajuan projek setempat yang dibangkitkan oleh Ahli-ahli Yang Berhormat, khususnya bagi the Honourable Member for Beaufort di bawah Rolling Plan Kedua Rancangan Malaysia Ketiga Belas bagi tahun 2027 sejumlah RM166.4 juta diperuntukkan untuk 19 projek bekalan air di Sabah dengan jumlah kos projek yang bernilai RM RM3.59 billion. Program NRW Kebangsaan di Sabah pula melibatkan kos RM349 juta. Projek naik taraf Muka Sauk, Loji Rawatan Air Beaufort 2 dijadual siap pada 4 Februari 2027. Manakala penggantian alat jana kuasa di Loji Rawatan Air Beaufort 1 serta loji berkaitan dijadual siap pada 9 Ogos 2027. Penyelarasan pelaksanaan turut melibatkan Kerajaan Negeri Sabah. Seterusnya, bagi menjawab persoalan the Honourable Member for Kalabakan— ada Kalabakan? Ndak ada. Bagi the Honourable Member for Kuala Kedah, yang membangkitkan beberapa perkara, kemajuan fizikal projek menaik taraf Loji Rawatan Air Pelubang. Kuala Kedah ada ya?
Ada, ada.
Okey. Rawatan Loji Rawatan Air Pelubang telah mencapai 95.35 peratus. Sementara itu, Projek Loji Rawatan Air Sungai Limau dan Bukit Selambau telah diambil alih pelaksanaannya oleh Kerajaan Persekutuan selepas penamatan kontrak terdahulu bagi memastikan kerja-kerja dapat diurus dan teratur. Saya melawat kawasan ini. Bagi the Honourable Member for Puncak Borneo— ada dalam Dewan? Projek Loji Rawatan Air Landeh berkapasiti 200 juta liter sehari termasuk tangki simpanan di Bukit Sipaya dan rangkaian paip ke jalan Kampung Serian masih di peringkat pra pelaksanaan. Surat Setuju Terima ataupun SST dijangka dikeluarkan pada suku pertama 2027. Ini satu kejayaan the Honourable Member for Puncak Borneo. Tak lama dah nak terima SST. Boleh heboh dah.
[Bangun]
[Bangun]
Bagi the Honourable Member for Klang pula, Projek Kolam Takungan Dwi-fungsi Sungai Rasau.
Yang Berhormat Menteri, Puncak Borneo nak minta penjelasan sikit.
Sikit sahaja nak habiskan. Sikit saya nak habiskan. Dwi-fungsi Sungai Rasau yang menggabungkan tebatan banjir dengan sumber air mentah mencatat kemajuan 11.44 peratus mengikut jadual dan dijangka siap pada 4 Disember 2027. Untuk pengetahuan the Honourable Member for Klang. Silakan Yang Berhormat.
Terima kasih Yang Berhormat Menteri. Dalam perbahasan tadi, saya ada juga mengutarakan beberapa masalah tebatan banjir dan juga ledakan-ledakan di kuala-kuala sungai. Saya mohon kalau tidak dapat menjawab secara lisan, secara bertulis pun boleh dan saya juga ingin mengetahui sama ada projek yang telah saya ajukan kepada Kementerian PETRA telah diambil perhatian dan apakah status terkini. Dan juga apa yang saya bahaskan tadi yang saya sebut satu persatu menerima pertimbangan daripada kementerian. Jadi, kalau tak boleh lisan, bertulis pun boleh.
Yang Berhormat, sekejap. Tadi saya ada membangkitkan juga berkenaan status perkembangan Empangan Cinta Mata. Dan, kalau boleh bagi sikit panduan ataupun apa-apa update berkenaan apa yang telah saya bahaskan tadi. Terima kasih.
Terima kasih Honourable Chairman. Terima kasih sahabat Kalabakan. Sebenarnya dia di belakang, tapi dia awal tanya. Memang ada dalam jawapan. Dia pandai potong queue, dia pandai potong tang kona. So, jawapan dia Kalabakan secara spesifik di kawasan sebenarnya, isu bekalan air ditangani menerusi Projek LRA Cinta Mata 2 yang peruntukannya RM335 juta, kemajuan 21.58 peratus, siap Julai 2028. Dan Program NRW Sabah, RM349 juta. Bagi bekalan elektrik, Projek Sabah Southern Link Fasa 2 RM1.4 bilion kini dalam pertimbangan dalam Rancangan Malaysia Ketiga Belas. Manakala status Projek Hidroelektrik Upper Padas dipantau rapi bagi tebatan banjir dan sungai RTB Sungai Tawau Fasa 1B akan dimohon dalam Rolling Plan seterusnya. Manakala penyelenggaraan Sungai Sabah diperuntukkan RM10.5 juta bagi tahun 2027. Ini perkara yang dibangkitkan oleh Kalabakan. Dan saya percaya
yang di mana bawah kuasa kerajaan negeri, kita minta juga Kalabakan berhubung dengan Ketua Menteri supaya agar dalam Rolling Plan seterusnya akan dapat dibangkitkan lebih cepat daripada biasa kerana kuasa kerajaan negeri juga agak besar dalam soal membangkitkan prioriti dalam setiap projek yang kita bangkitkan. Dan terima kasih saudara Yang Berhormat sahabat saya dari Kalabakan. Dan bagi perkara yang dibangkitkan oleh rakan-rakan, seterusnya saya dah bagi tahu bahawa...
Timbalan Menteri. Sini, Klang.
Oh Klang.
Saya panjang lebar banyak perkara telah dibangkitkan. Hanya nampaknya dwi kolam saja dijawab. Saya faham, saya faham. Sepertimana tadi, saya pun mohon agar semua jawapan bertulis perkara-perkara yang saya bangkitkan tentang projek-projek semenjak 2024 sehingga kini. Sebab Klang adalah antara yang paling selalunya banjir. Bukan satu tahun sekali. Mungkin sebulan sekali pun banjir. Perkara banyak projek pula diumumkan. Itu sebab saya tadi marah dengan kontraktor pula tadi saya kata, "Somebody's pain become somebody's gain", I kata. So, tolong. Saya perlukan secara bertulis kalau tak ada jawapan penuhnya.
Honourable Chairman, memandangkan yang kita sebut ini adalah perkara penting api dan air, elektrik dan air. Saya mencadangkan Honourable Chairman bagilah Timbalan Menteri masa yang lebih sikit. Dan oleh kerana tadi jiran saya di Klang ini, kami ini semua dah terbeban dengan banjir. Mereka tengah dengar, nak tunggu ini. Mangsa banjir tengah tunggu Timbalan Menteri. Jangan lupa yang Kapar sebut. Saya setuju dengan apa yang Ampang syorkan tadi. Ada macam MARRIS itu, sistem MARRIS. Setuju.
Bolehlah tambah tiga minit lagi Yang Berhormat.
Tebal lagi Yang Berhormat Pengerusi. Di bawah lagi, saya tak angkat lagi, dah bagi air untuk minum. Yang Berhormat, sebenarnya mungkin setiap kementerian cara menjawab lain. Memang secara spesifiknya mungkin kita jawab secara bertulis, tetapi sebagai contoh ya, saya telah habis perkara Yang Berhormat Klang pula projek kolam takungan dwi-fungsi sungai. Yang Berhormat beritahu, saya menjawab satu sahaja, tetapi sebenarnya cara kementerian kami, dia akan pergi kepada satu-satu. Air bila air, air. Bila elektrik,
elektrik, bila— okey, sebagai contoh saya nak beritahu. Sebagai contoh ya. Kita mengambil maklum semua dan bagi cetekkan sungai, sistem saliran, paritan, tidak senggara, kajian, penyelidikan, menangani isu air clean semua ini.
Okey, bagi perkara tersebut dibangkitkan oleh the Honourable Members for Kuala Nerus, Beaufort, Bukit Gantang, Kuala Kedah, Puncak Borneo, Klang walaupun Puncak Borneo dah jawab tadi, tapi ada pula jawapan yang lain. Arau, Batu Pahat, Kalabakan pun ada lagi dalam jawapan. Parit Buntar, Kangar, Setiu berkenaan Projek Rancangan Tebatan Banjir (RTB) di bawah Rolling Plan Kedua (RP2) Rancangan Malaysia Ketiga Belas (RMK13) sebanyak 151 Projek Rancangan Tebatan Banjir telah diluluskan dengan anggaran kos keseluruhan RM28.1 bilion. Jumlah ini merangkumi 15 projek baharu dan 156 projek sambungan. Maklumat status projek terperinci di kawasan Parlimen masing-masing akan diberikan secara bertulis. Yang Berhormat saya akan hantar secara bertulis kerana kalau hendak jawab semua 153 projek ini, 136 projek sambungan, 15 projek baharu, 101 Projek Rancangan Tebatan Banjir ini mungkin tidak sempat, saya jawabkan satu persatu.
Menteri, menteri. Sikit, sikit sebab itu saya bangun hendak puji menteri.
Saya dah melawat sebenarnya Jelutong. Jelutong saya dah tengok...
Saya dengar semua maklum balas diberikan memang layak jadi menteri penuh. [Applause]
[Interjects] Aik oh!
Ini saya sokong sebab Menteri pernah lawat kawasan saya dan kita berjaya menyelesaikan masalah banjir di situ. Menteri ini saya sokong, Timbalan Menteri ini saya sokong. Cara dia jawab, cara dia beri maklum balas semua benda dia beri tumpuan. Jadi Menteri saya sokong dan saya harap Kawasan Parlimen Jelutong kita dapat selesaikan. Patut jadi Menteri penuhlah, saya sokong 100 peratus. Terima kasih Menteri. Kita dapat selesaikan masalah di Jelutong. Terima kasih.
Yang Berhormat Menteri, Yang Berhormat Menteri yang itu saya sokong untuk jadi Menteri penuh. Cuma untuk air masin itu air masin Sungai Lencongan Barat itu kalau Yang Berhormat Menteri tak dak, tak sempat bagi jawapan lisan boleh bagi jawapan bertulis. Terima kasih.
Timbalan Menteri, jangan lupa Rasah menanti jawapan. [Laughter]
Many people are waiting for this. How is it, Honourable Member? I thought I would be given permission to finish everything, may I, Honourable Chairman? Can I finish? Add three more minutes.
It's 10 minutes, Chairman, not three minutes, it's 10 minutes. This is not RTB yet, let alone RPI.
Because we still have a lot more of this, we still have a lot more. No, you can't.
Earlier I was given a stern warning by Hulu Langat, and then he praised me, and the praise for me was supported by Jelutong as well, praised me, so the answer for Hulu Langat, the Federal Government, because I'm afraid I won't have time for Hulu Langat. [Laughter] For YB Hulu Langat, the Federal Government has allocated a short-term drainage improvement allocation, estimated at RM1 million in 2026, which has been fully completed to address the flood problem in high-risk areas. For the long-term solution, three Flood Mitigation Plan (RTB) Projects for the Langat River Basin worth RM1.23 billion are being implemented. This Langat is great, Honourable Chairman. [Applause]
Thank you, full Minister, full Minister!
Parit Buntar, must I also praise? Insya-Allah, I will become a Minister when BN PN forms the government.
Wait, wait, wait [Applause]
Full Minister BN, PN.
Parit Buntar has not answered yet.
Enjoy yourself, Hulu Langat, this afternoon. Enjoy. [Laughter] Covering Sungai Langat Phase 2, Package 1, tender selection in 2027. Phase 2, Package 2 in Sepang is expected to be completed in April 2031, and Phase 1 is expected to be completed in May 2027, to reduce flood risk comprehensively and sustainably. I understand that my constituency is also affected by floods, I understand the problems of this flooding. And I am also waiting for completion in my constituency. The RTB for my constituency is not large, RM173 million, only at the design stage, but already SST.
So, Honourable Chairman, however, these projects are being implemented in the upper and middle reaches of the Sungai Langat basin. Their implementation is expected to contribute to comprehensive flood risk reduction along the entire river basin, including downstream areas such as the Kuala Langat District. PETRA, through the Department of Irrigation and Drainage (JPS), will evaluate the effectiveness of these projects once completed, particularly in terms of water levels and flood duration in the constituency of the Honourable Member for Hulu Langat. And I believe the Honourable Member for Hulu Langat will continue to monitor and assist us in the implementation of such high-value projects. For example, in Rantau Panjang and the surrounding area, and up to several other places. If we count the RTB, its value is quite large, worth RM3 billion, and I went down myself, and insya-Allah I will also go down to Hulu Langat to see the effectiveness of these projects. And as for the answers raised earlier, what was raised by the Honourable Member just now for the constituencies of Kuala Nerus, Beaufort, Bukit Gantang, Kuala Kedah, Puncak Borneo, Klang, Arau, we will— these higher-value ones— we will liaise with the Honourable Member because time does not permit. So that the Honourable Member can see for himself what answers we will raise. And I also ask that the performance of contractors be monitored more closely and the impact on the added value of projects in our areas. For example, I can give the mileage to Rantau Panjang, and another one, I forget the area of Dato' Mumtaz, Tumpat, yes? Tumpat, who took me down to the field, and I saw for myself the project worth RM3.1 billion along the borders of Thailand, the Thai border, what is the name, Sungai Golok, I saw it myself. And this is indeed the role of the Honourable Members themselves, who must play a role so that they can report to us and we can assist in this matter.
[Bangun]
Thank you, Honourable Member.
I hope— the two matters I raised will also receive answers, because the main intake substation (PMU) in the Bagan Serai and Alor Pongsu area is already full. So, will a new PMU be built? And another issue is about the breakwater at the mouth of the Sungai
Beruas at Pantai Remis. Is an allocation provided for that project? I hope to receive a written answer if it cannot be done orally. Thank you.
Honourable Minister, I previously submitted an application to the state JPS regarding the maintenance or cleaning of rivers, especially when the monsoon season arrives, sometimes the water flow causes rapid overflow because it is not maintained, but until today there has been no action. I will forward it to the Honourable Minister. Then, regarding the full Minister just now, I agree, Honourable Member, on the condition that the government does not include PH, does not include DAP. BN and PN government, insya-Allah. [Applause]
So, time is up, Minister. So, just please wrap up. Yes, yes.
Before that, Minister, Ampang.
Mr Chairman, you're not allowing it anymore.
Just a moment. Chairman, please. On the issue— I am tired of hearing that we don't have enough money, in fact, but we keep asking, asking, asking, but I want to ask— I repeat my question, is the government serious about enacting an Act, yes, to resolve the maintenance and management of the national drainage system? Because if we do not prevent it, it will become a problem for everyone. Later I am afraid several places in this country will be submerged. Thank you.
I actually agree very much with the views of Ampang. I agree very much, very, very much agree, which is what we discussed, mainly the financial position. If we have sufficient financial position, I think the risk of flash floods and floods is actually lower, and we know we have once— I also visited the area of the Menteri Besar of Kelantan by coincidence— which was about, if I am not mistaken, 15 kilometres long, costing RM21 million to deepen and widen the river, and the flood risk was indeed reduced. And that is actually its effect, but all Honourable Members must remember that these flash floods are not only under the purview of JPS. I already answered yesterday, the Padang Besar area, we have seen, we have observed the effect
of the non-administration of drains at the local authorities themselves will also cause flash floods because the water does not flow. For example, we— our monsoon ring does not overflow with water, yet there are flash floods.
That means, the water flow from the local authorities does not thoroughly clean the drains, causing flash floods to occur. That means, the network among all of us must actually be implemented together to avoid such matters, and we try our best so that these things will not happen. Thank you, Ampang. Indeed, a very good view. For Pengkalan Chepa, let us discuss it later, yes. We will discuss, and Beruas. Beruas just now felt that I did not answer to his satisfaction. I answered only briefly because there were not many answers for Beruas. Honourable Member for Beruas, regarding energy management and the main intake substation (PMU), continuous grid monitoring is being carried out to support the load of industrial areas and the development of the Agrivoltaic Project. Meanwhile, for the issue of coastal erosion and river mouth flow at Pantai Remis Beruas, PETRA, JPS and the National Hydraulic Research Institute of Malaysia (NAHRIM) are conducting erosion control studies and planning river mouth dredging and rehabilitation works according to the priorities of the technical side, which we will carry out. For the Honourable Member for Rompin, we will answer in writing.
YB Minister, Lumut. Lumut.
Rompin. It's too late now. The Chairman has already warned three times.
Time is up already... [Unclear]
Give Lumut a chance. Lumut always asks to debate, and doesn't get to. Asks to debate, doesn't get to.
I am afraid later...
PETRA, the kind and handsome Deputy Minister, please answer. [Laughter]
Write it, Honourable Member. In writing.
Honourable Chairman, as a closing, I would like to record my highest appreciation and thanks to all the Honourable Members who
have taken part and contributed views, suggestions, and constructive criticism to PETRA, and this will be one of the sources of inspiration for us to develop PETRA better. Although I did not have time to answer every single issue raised, I believe we have recorded and will thoroughly examine all the allocations under the Budget 2027 and they will be utilised optimally to strengthen the national energy and water systems and ensure that the welfare of the people remains a priority. Flowing water generates energy, lighting the village to the city; unity built must be preserved, do not let speech break unity. [Applause] Insya-Allah, we will hold the spirit of cooperation to ensure shared responsibility is raised, the interests of the state and the people.
Full Minister as long as there is no PAS. [Laughter]
Thank you, Honourable Chairman. Thank you to fellow Honourable Members who have given such excellent views. Wabillahitaufik walhidayah, wassalamualaikum warahmatullahi taala wabarakatuh.
Thank you, YB Minister. The question is that the sum of RM403,408,400 for Head B.33 of the Operating Expenditure Estimates 2027 be part of the Schedule, be agreed to. [Question put and agreed to] [Head B.33 ordered to be part of the Schedule]
The question is that the expenditure mentioned in Head P.33 in the Development Expenditure Estimates 2027 be approved. [Question put and agreed to] [Head P.33 became part of the Estimates]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.30 [Schedule] – Head P.30 [Development Estimates 2027] –Bill
Supply Head B.30 and Development Head P.30 under the Ministry of Science, Technology and Innovation (MOSTI) are open for debate.
The list of debaters is as follows: the first, YB Raub. The second, YB Kuala Terengganu. The third, YB Tuaran. The fourth, YB Bentong. The fifth, YB Gerik. The sixth, YB Balik Pulau. The seventh, YB Batang Sadong. The eighth, YB Merbok. The ninth, YB Kepong. The tenth, YB Shah Alam. The eleventh, YB Kubang Pasu. The twelfth, YB Batu Pahat. The thirteenth, YB Batu Gajah. The fourteenth, YB Jerantut. The fifteenth, YB Keningau. The sixteenth, YB Ampang. The seventeenth, YB Padang Rengas. The eighteenth, YB Bakri, and the last, the nineteenth, YB Putrajaya. Please proceed, YB Raub, five minutes.
Thank you, Mr Chairman. I refer to Item 030100 – Strategic Technology. Yesterday, Malaysia and France exchanged a Memorandum of Understanding on critical minerals. President Macron described the rare earth projects, Carester and Malaco, as the pillars of this cooperation. President Macron stated that this project is expected to begin operations in early 2027, whereas mining in Gua Musang is targeted to start in 2028. Has the EIA assessment for the mining project in Gua Musang been completed and has its report been approved? If the Gopeng plant begins operations in early 2027, where will its first supply come from? Mr Chairman, the government previously wanted to maintain the export moratorium on raw materials until 2027. However, on 1 October this year, the government opened up space for exports for research or processing purposes. Why was the moratorium relaxed earlier? For the output of the project that will be sent to France, has the material already been separated in Malaysia or is it still mixed? What technology will Carester transfer, to whom and when? Mr Chairman, I now turn to Item 030400 – Atomic Energy Department. We must learn lessons from the case of Bukit Merah, Perak, in the 1980s. After the Asian Rare Earth plant was closed, work to clean up the site and manage the residue continued. The disposal site at Bukit Kledang was placed under long-term monitoring for 300 years. Mr Chairman, since 2012, Lynas has been required to submit the plan and location of the PDF. After the change of government, site approval was made a condition for licence renewal in 2019, but construction only began in 2022.
The target completion date then shifted from the end of 2024 to the end of 2026. As of 31 August 2026, the progress of construction and operation is only 77 per cent. What has caused this delay and when will the PDF be fully completed? Does the Atomic Energy Department go down to the site to verify this 77 per cent figure, or is this figure based only on Lynas's report? Since 2012, the PDF has still not been completed until now. That is 14 years. ECRL, a mega project like this that spans several states, has already been completed, but Lynas's PDF has still not been completed to this day. This is indeed a very big problem. The disposal issue is related to the plan to separate thorium, which is a radioactive material, from Lynas's waste. In 2023, the government allowed the cracking and leaching process to continue in Gebeng based on laboratory study results after the licence was renewed last March. Lynas was given a period of five years to stop producing WLP waste that exceeds the radioactive limit. Has the modification plan been received? When will the tests at the plant begin and does this treatment cover waste that has already been disposed of? Greenpeace Malaysia and also Save Malaysia Stop Lynas have questioned whether it is worthwhile to separate thorium from Lynas's waste. By the same weight, monazite, a natural mineral, contains more than 30 times the amount of thorium compared to Lynas's waste. Therefore, if it is more expensive to obtain thorium from Lynas's waste, is there already a buyer willing to pay a price that covers that cost? Mr Chairman, if this treatment method fails on an industrial scale, will the government reinstate the condition that the cracking and leaching process be moved to Australia? I also urge the government to negotiate with Australia regarding the return of accumulated waste with the cost borne by Lynas. Thank you.
Thank you, YB Raub. Please proceed, YB Kuala Terengganu.
In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum, greetings of peace. Thank you, Mr Chairman. Item P.00800 – Research and Development (R&D) Programme.
The total allocation for the Ministry of Science, Technology and Innovation (MOSTI) for 2027 amounts to RM1.29 billion, an increase of around 1.3 per cent compared to 2026. However, despite this increase, the allocation for the R&D programme has been reduced from RM75 million in 2026 to only RM53 million in 2027, a reduction of RM22 million. The question is, what is the justification for this reduction when the government still targets increasing gross domestic expenditure on R&D (GERD) from 1.01 per cent of GDP in 2022 to 2.5 per cent by 2030? Furthermore, how will the ministry ensure that this reduction does not affect local research and the national GERD target, including the increase in private sector investment? Item P.94000 – Malaysia Debt Ventures Berhad (MDV). Mr Chairman, I would like to raise the issue of the 9.95 megawatt biomass power station project, Majunaka Eco Energy, in Naka, Padang Terap, Kedah. I have been informed that this plant has been completed, has received its CF. If I am not mistaken, it may have been licensed, but it still faces financing problems with MDV. It is understood that there is a claim that financing through UKAS, which had been approved for other purposes, be used to repay MDV's debt. If true, it is very unfortunate that the plant is complete but cannot generate revenue due to disputes over financing. I ask the Minister for an explanation of the actual position and to consider a mechanism for restructuring MDV's debt so that repayment can be made from electricity sales revenue, subject to financial assessment and the status of the SEDA licence. I would also like to ask, how many green technology projects financed by MDV are currently in the same situation, namely completed but still not operating due to problems such as these? Item P.83000 – Malaysian Industry-Government Group for High Technology (MIGHT). Mr Chairman, MIGHT has a role in strengthening the development of local technology and expertise in the REE industry to reduce the country's dependence on foreign technology. At present, local research institutions and institutions have reportedly made progress in processing and separation technology for REE up to TRL5. Industry players such as Malaco Mining, which was mentioned by Raub earlier, are also developing REE separation technology. However, to what extent can this progress be translated into the capability of the local industry?
Sehubungan itu, saya ingin mendapatkan penjelasan. Nombor satu, apakah perkembangan teknologi tempatan di dalam segmen pertengahan (midstream) REE khususnya pemprosesan dan pengasingan? Kedua, apakah mekanisme MIGHT untuk meningkatkan teknologi tempatan daripada TRL5 ke peringkat projek perintis TRL6 hingga tujuh sehingga ia dikomersialkan? Ketiga, adakah kerajaan turut mengkaji kaedah bioleaching sebagai alternatif kepada in-situ leaching yang berasaskan penggunaan ammonium sulphate? Apakah perbandingan kedua-dua kaedah dari segi kos, keberkesanan dan impak alam sekitar? Keempat, apakah sasaran MIGHT untuk membangunkan teknologi dan kepakaran tempatan termasuk pemindahan teknologi dan penglibatan industri tempatan bagi mengurangkan kebergantungan kepada teknologi asing? Item 030500 – Malaysian Nuclear Agency. Today the country relies on the TRIGA PUSPATI reactor, which has been in operation since 1982, as the only nuclear research reactor in the country. The Agency has stated plans to develop a new, larger research reactor to complement existing capabilities and explore new research fields, including semiconductor materials and advanced technology. In this regard, what is the status of the planning for the development of this new research reactor? Secondly, I would like to touch on the small modular reactor (SMR). To what extent can existing research capabilities and expertise support the evaluation of SMR technology, particularly in terms of simulation, modelling and safety analysis? What steps will be taken to ensure that related expertise and technology can be developed and mastered by local talent? Another important matter is radioactive waste management. Existing facilities are still under control and are able to manage radioactive waste from various sectors. However, the development of nuclear energy technology will bring the need for waste management that is far more complex, particularly high-level radioactive waste. Therefore, what is the government's long-term strategy to ensure that such waste can be managed safely should a nuclear power plant be developed? Is the deep geological repository method, that is, the storage of radioactive waste far
underground as a permanent solution, also being studied? That is all, thank you Mr Chairman.
Thank you, the Honourable Member for Kuala Terengganu. Next, I invite the Honourable Member for Tuaran.
Thank you Mr Chairman. Tuaran would like to begin the debate on the Ministry of Science, Technology and Innovation (MOSTI) at the Committee stage for Supply Head B.30, Items 020000 and 030000 – Science Planning and Promotion. Mr Chairman, the government's policy is to achieve a target of 60 per cent of secondary school students taking science and 40 per cent in non-science fields. This policy has been championed for a long time and various initiatives have been carried out. Among them, during my time leading this ministry, we worked with the Ministry of Education to introduce a new science pedagogy that we call the Inquiry-Based Science Education (IBSE), which was introduced in France and which has proven to attract the interest of many students, to the extent that in France the target number of students taking science exceeded 60 per cent and so on. That is one. Second, cooperation with the Ministry of Education to establish a centre that we call the STEM centre, modelled after, after STEM Jobs Centre in the United Kingdom, where teachers were trained, after which they were trained and incentivized to use the new science pedagogy such as IBSE and so on. And after that, it was indeed implemented in several schools as pilot projects in several schools across the country, and after that the STEM centre was established. But afterwards it was closed, closed in 2022. So, Tuaran wants to know, I want to know, what is the rationale for closing all of this? Closing the STEM centre that we had set up as an initiative. And then I would like to know what other measures have been introduced to help achieve the target of 60 per cent of secondary school students taking STEM? Because from my observation at this time, it is not even 50 per cent, only about 40 per cent is our achievement.
And it is even worse in Sabah and Sarawak. In Sabah, because many centres and agencies involved in inculcating STEM are all in Peninsular Malaysia, there are none in Sabah. We tried, for example, to set up a national science centre in Sabah but did not succeed. So, I would like to ask, what initiatives are currently being implemented by the ministry to increase, increase to achieve this science, technology and innovation policy target of 60 per cent? What plans and steps are there to ensure that Sabah and Sarawak can enjoy, receive more effective services in terms of science culture promotion? For example, the National Science Centre, is there a step to build it? We had started it in Tuaran but it has not— was not realised because we were not there for long. Next, in connection with that, we also took earlier steps to appoint science ambassadors, that is, those who would promote STEM and so on. But I have been informed that such programmes no longer exist. So, I just want to know what other steps, other steps to achieve the policy target that has been set.
Next, Item 030000 – Technology Development. So, in the use of this technology, we want our economy to be technology driven, so that our economy is resilient and so on. And that is why we encourage innovation, we want to enhance research and so on. So, as the friend from Kuala Terengganu mentioned just now, the target for the research budget to reach 2.5 per cent of GDP has never been achieved. In fact, in this budget, which we say reaches for the skies, rooted in the earth, it has decreased further. Okay, the fund or budget for research has decreased further. So, where is the commitment? Is the government truly committed to ensuring that research is enhanced, innovation is increased and these innovations can be commercialised? Where is the commitment? That is what we want to ask. In matters of innovation that have long been successful, for example under the Malaysian Nuclear Agency, in agriculture. Have these all been commercialised? For example, nuclear rice. There is also— what is it called, nuclear banana too was produced there. Strand, has this been commercialised? There is also
materials science such as durable cables that are fire-resistant and so on. What is the extent of their commercialisation and success and so on? In this matter too, under Nuklear Malaysia and the Atomic Energy Department, Tuaran would like to ask, what steps are being taken to ensure that, ultimately, nuclear matters can be used to generate electricity? So, in terms of research, in terms of providing human resources, in terms of building its legal framework. And because at the Federal level, a different agency regulates electricity matters, in Sabah it is different. Does the ministry at the state level in Sabah also see the possibility of cooperating with the equivalent ministry, namely MOSTI in Sabah, so that legal matters regarding nuclear energy, electricity generation using nuclear, can be— be implemented? That is all, thank you.
Thank you, the Honourable Member for Tuaran. Next, I invite the Honourable Member for Betong.
Greetings of peace and thank you. Mr Chairman, for Supply Head B and P.30, MOSTI, last year during the debate, Betong raised the issue of Sarawak's participation in the financing of national research and development, particularly access to R&D grants and opportunities to commercialise research results. So Mr Chairman, for Budget 2027, Betong would like to see the extent to which this matter has been given attention and what progress has been achieved? Therefore, I will go straight to the first item, namely Development Item 00800 – Research and Development (R&D) Programme. The allocation for this programme, Mr Chairman, has decreased from RM75 million in 2026 to RM53 million in 2027, a reduction of RM22 million. So, last year the ministry informed that there were 17 R&D applications from Sarawak under RMK12 but only one was approved. In view of this, Betong would like to seek clarification. Firstly, how many R&D grant applications from research institutions and Sarawak companies were received and approved throughout 2026? What research fields and what amount of funds were successfully obtained? Secondly, what is the main factor for the reduction of RM22 million in the allocation for 2027? Is this due to a reduction in projects, or rescheduling, or a change in the financing method?
So, Betong proposes that the ministry give full attention to research involving agricultural biodiversity and renewable energy in Sarawak. The assessment of grants should also take into account the actual cost of carrying out research in interior areas, particularly logistics costs and fieldwork, so that Sarawak researchers are not placed at a less competitive disadvantage. Mr Chairman, secondly, Development Item 00605 – National Biotechnology Institute of Malaysia (NIBM). The NIBM allocation has increased significantly from RM25.39 million to RM46.401 million for 2027. Betong would like to know, what collaborative projects have been initiated between NIBM and universities or research institutions in Sarawak throughout 2026, and how many local institutions and researchers were involved? Betong proposes that part of this additional allocation be utilised to strengthen biotechnology research in Sarawak, particularly in the fields of agriculture, food, biodiversity and health. More importantly, what is the ministry's target to ensure that these research results can be translated into products, into technology and into industrial cooperation? Not merely ending up as research reports. Mr Chairman, thirdly, the commercialisation of innovation and community innovation development under Development Item P.18000 – Malaysian Research Accelerator for Technology & Innovation (MRANTI), which increased from RM10 million to RM13 million. Last year, the ministry informed that the MRANTI commercialisation fund was expected to open in the first quarter of 2026. So Betong would like to know, how many projects from Sarawak have received financing or facilities from MRANTI throughout 2026? And how many of them succeeded in securing customers, generating sales or entering the commercial market? Betong proposes that MRANTI's cooperation with SDEC, universities and Sarawak industry be strengthened, particularly in the development of agricultural technology, drone development and energy solutions. Next, fourthly, Development Item 03700 – Malaysia Innovation Foundation, increased from RM1.5 million to RM5.5 million. So my question is, what is the number of innovation projects from Sarawak that have benefited from this foundation's programmes? How many were successfully continued after competitions or mentoring programmes and given the opportunity to be tested and used by the community?
Betong proposes that this programme be expanded to schools, rural communities and youth in Sarawak, including the Betong area. Among the approaches that can be implemented are agricultural technology demonstrations such as soil sensing, smart irrigation and produce processing, in cooperation with the Sarawak Department of Agriculture, TVET institutions and farming communities. Mr Chairman, finally, Betong wishes to emphasise that the success of MOSTI should not be measured solely by the amount of allocation or the number of research projects. We want to see more research that can produce products, innovations that are successfully commercialised and technologies that truly solve the problems of the people out there. Therefore, Betong earnestly hopes that the ministry can ensure that we in the state of Sarawak are given broader and fairer opportunities to participate in national R&D funds, biotechnology development and the nation's innovation commercialisation programmes. Research must produce benefits, innovation must open economic opportunities and, most importantly, technology must reach the people. That is all, thank you.
Thank you, the Honourable Member for Betong. Next, I invite the Honourable Member for Gerik.
Assalamualaikum warahmatullahi taala wabarakatuh and greetings of peace. Thank you to Mr Speaker. I would like to raise two main matters relating to the allocation of the Ministry of Science, Technology and Innovation, namely the cultivation of science among young people and the effectiveness of research on the commercialisation of local technology. Firstly, the issue of expanding the cultivation of science, innovation and space. Mr Speaker, I refer to Supply Head B.30, Programme 020000 – Science Planning and Promotion, which received an allocation of RM76.62 million for 2027.
[Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) chairing the Committee] Under this programme, the activities of the National Science Centre are allocated RM19.22 million, while STI culture promotion activities receive RM18.33 million. I
would like to question to what extent this allocation can bring a culture of science and innovation to students and young people across the country, particularly in rural areas. I propose that MOSTI establish science and innovation centres in every state and, in stages, in the districts. These centres do not necessarily require large buildings. They can be set up through STEM laboratories, robotics spaces, innovation workshops, artificial intelligence facilities and experimental centres that can be utilised by schools, universities and local communities. I also wish to propose that MOSTI expand astronomy and space education facilities through observatories, public telescopes and stargazing platforms at suitable locations across the country. For example, Lenggong, Perak should be studied as one of MOSTI's pilot project locations for astronomy and space research, based on its geological heritage value and the related meteorite site. The potential of Bukit Bunuh, Lenggong in Perak, which has scientific evidence of a meteorite impact approximately 1.83 million years ago, and this site is a UNESCO geological and archaeological treasure and should continue to be studied, preserved and promoted as a science research asset for our country. In this regard, under Supply Head B.30, Item 030000 – Technology Development, the Malaysian Space Agency (MYSA) receives an allocation of RM73.34 million. My question to the ministry is, can part of the allocation and expertise of MYSA be utilised to expand astronomy education and exposure to space science to school students, university students and young people? Do not let space technology be developed only by experts, but knowledge and experience of it must also reach our young generation. Secondly, R&D must have users and markets. Mr Speaker, I turn to Development Head P.30 – Ministry of Science, Technology and Innovation. For 2027, the STI commercialisation category receives RM204.1 million, while the STI research category receives RM104.9 million. In addition, P.30 Item 00800 – Research and Development (R&D) Programme receives an allocation of RM53 million. My question. After the government spends money on research and producing a technology, who will be the users of that product? We do not want research results to end up merely as
prototypes, reports or exhibition materials. Successful products must have a pathway to enter the country's market. I propose that MOSTI introduce an approach in which the government becomes the first user, or first buyer, by involving local authorities (PBT), GLCs, ministries and government agencies as partner users of local technology. As a simple example, if local researchers succeed in producing an automatic drain cleaning machine, a flood monitoring system, a smart rubbish bin or a waste segregation machine, why can PBT not be the first user to test the technology? If proven effective, safe and cost-saving, its use can be expanded to other PBT. The same goes for local universities that produce pipe leak detection systems, water quality sensors or area monitoring drones. Relevant government agencies should become testing partners and prospective users. We can learn from China, which linked technology development with the real needs of its cities and local authorities. The government and public agencies can be among the early users of the machines and technologies developed. I also refer to Supply Head B.30, Item 030000 – Technology Development, which receives RM410.84 million including fund and commercialisation activities of RM23.10 million. Meanwhile, under Supply Head B.30, Item 040000 – Special Programmes, its allocation is RM212.90 million. With development and commercialisation allocations of this size, I would like to ask, is MOSTI prepared to establish a matching mechanism between researchers, local technology companies, PBT, GLCs and government agencies so that products successfully developed have their own prospective users from the very beginning? I would also like to request the ministry to explain how many local R&D products have actually been commercialised and used by government agencies, rather than merely succeeding in producing prototypes? That is all, thank you.
Thank you, the Honourable Member for Gerik. I invite the Honourable Member for Balik Pulau.
Thank you, Chairman. I rise to address Item 040500 – MIMOS Berhad, or more specifically the role of MIMOS in developing advanced semiconductor packaging technology in Malaysia. I once worked at ASE Electronics, a semiconductor factory in Penang. From that experience, I know that assembly and testing work requires high engineering skill and discipline. Penang has long built this expertise. The question now is how we use that strength to develop our own processes and bring technology owned by Malaysian companies to the market. In advanced packaging, with respect, chip processors and memory chips can be integrated in a single package so that data moves faster between the two. For local companies, the challenge is gaining access to equipment and expertise to build prototypes, test reliability and prove that the process can be used on a commercial scale. This is where MIMOS can play a major role. First, what is the status of the advanced packaging centre planned under the National Semiconductor Strategy, using existing facilities such as those at MIMOS together with CREST and industry partners? Among 2.5D technology, 3D chip stacking and hybrid bonding, which can already be tested by local companies at MIMOS facilities today? When are the remaining facilities expected to be available? Second, what are the intended outcomes? From the allocation under this item, how many Malaysian companies have used MIMOS facilities to produce prototypes, and how many have reached the stage of customer validation or commercial production? For joint projects with industry, how are ownership and usage rights to intellectual property determined so that local companies can commercialise the technology developed? Third, what is the specific role of MIMOS in the advanced packaging efforts being carried out by the government? MOSTI has announced a programme worth RM185 million under the Malaysia Science Endowment together with five local companies. I ask the Minister to explain how the work of MIMOS and this advanced packaging centre is coordinated with that programme. Who is
responsible at each stage, from process and prototype development up to customer validation? Chairman, the measure of success I would like to see is how many Malaysian companies succeed in mastering this process, train local engineers and win customers for the products developed. I ask the Minister to state measurable targets for 2027 so that this House can assess the results of the allocation to MIMOS next year. I also wish to discuss nuclear energy, particularly under Item 030400 – Atomic Energy Department. Malaysia is currently undergoing an important energy transition in its efforts to achieve net zero by 2050. I believe nuclear energy is one approach that we can consider. In pursuing this, the need for technology development or plant construction must go hand in hand with increased attention to public safety, the environment, radioactive waste management, law and accountability. In this context, I welcome the amendments to the Atomic Energy Licensing Act 1984 through Act A1779, namely the Atomic Energy Licensing (Amendment) Act 2025, which strengthens safety, security and nuclear safeguards in accordance with international standards. In several earlier oral question sessions and policy debate winding-up speeches, MOSTI gave explanations on strengthening nuclear legislation in line with the amendments to the Atomic Energy Licensing Act 1984 [Act 304]. I note that MOSTI has the technical responsibility for strengthening nuclear legislation and coordinating the implementation of the International Atomic Energy Agency (IAEA) standards. That explanation raises more specific follow-up questions on Malaysia's preparedness for the relevant international instruments and on domestic legal coordination measures to meet those obligations. The more substantive follow-up aspects are the implementation of the new provisions, the adaptation of regulatory procedures, inspection capacity and enforcement achievements after the amendments took effect on 1 December 2025.
Therefore, I would like to ask MOSTI what assessment has been carried out by MOSTI together with the relevant ministries and agencies in order to
identify legal gaps and the requirements for compliance with international instruments in nuclear development. Second, what actions are planned for 2027 to support the nation's preparedness regarding those obligations? What improvements to regulatory operations have been or are being implemented by the Atomic Energy Department following the enforcement of the amendments to Act 304? What are the performance indicators and 2027 targets for assessing the effectiveness of inspection, compliance and enforcement against licence holders? Chairman, Item 00900 – Nuclear Malaysia Agency. Explanations regarding the role of the Nuclear Malaysia Agency in reactor research, safety assessment, radioactive waste management and the development of expertise have already been given by the government. However, the budget shows a reduction of about 50 per cent in the development allocation for the Nuclear Malaysia Agency. So, I― accordingly, the impact of the allocation reduction on the continuity of projects and on development, facilities and education priorities should be examined carefully by the government. So, therefore, I would like to ask how the ministry will draft a priority strategy for implementing the 2027 allocation to ensure the continuity of R&D and the development of the nation's nuclear technology capacity. Chairman, nuclear energy is not merely a matter of technology but a matter of public trust. That trust can only be built when the government demonstrates real readiness in terms of law, institutions and technical capability, not merely good intentions. I hope MOSTI can give a clear and concrete explanation so that Malaysia moves forward with confidence and with safety as its foundation. That is all, thank you.
Thank you, the Honourable Balik Pulau. The floor is given to the Honourable Batang Sadong.
Thank you, Dato' Chairman. I will go straight to the debate. Under Item 030100 – Strategic Technology, the allocation is RM13.23 million in 2027 compared with RM12.58 million in 2026. In an era of rapid digitalisation and the swift development of AI, cyber security is no longer merely a technological issue but also involves the economic security and critical infrastructure of the nation.
Cyber attacks on financial systems, hospitals, food supplies and utilities show that digital disruption can have a direct impact on people's lives. For example, in early November 2026, cyber attacks were reported to have disrupted supermarket cooling systems and blood storage in Europe. In Malaysia, NACSA (National Cyber Security Agency / Agensi Keselamatan Siber Negara) has also raised the cyber security threat level, while MKN (National Security Council / Majlis Keselamatan Negara) confirmed system disruptions at several financial institutions on 7 November 2026. My question is how prepared Malaysia is to face such threats? What steps will MOSTI take together with NACSA and MIMOS to strengthen research and development of AI and local cyber security technology, particularly to develop early detection systems and protect the nation's critical infrastructure? Next, I wish to touch on the effectiveness of national investment in research and development (R&D). Under Item 030200 – Funds and Commercialisation, the allocation increases from RM21.64 million in 2026 to RM23.10 million in 2027. However, for Item 00800 – Research and Development Programme, the development allocation falls from RM75 million to RM53 million. In a situation where the nation is striving to strengthen the AI, semiconductor and strategic technology industries, what is the justification for this reduction, and I request an explanation of the detailed breakdown of these R&D items. At the same time, the success of R&D should not be measured solely by the volume of research and academic publications. Instead, research outcomes must be translated into technological products and innovations that can be commercialised and utilised by industry and society. What monitoring mechanisms and targets does MOSTI have to ensure that government-funded research successfully penetrates the market? And what forms of follow-up funding and industry collaboration are provided, particularly to help technology start-ups and small and medium enterprises develop local innovation? Next, under Item 00605 – National Institute of Biotechnology Malaysia, the allocation is RM46.40 million in 2027 compared with RM25.40 million in 2026. This increase is an opportunity to strengthen biotechnology research, particularly in producing high-quality seeds, improving crop productivity and developing high-value bioproducts that can support national food security.
Sarawak itself has rich biodiversity and biological resources with great potential to be developed through biotechnology research. Accordingly, what results of NIBM research have been successfully commercialised, and what is MOSTI's plan to expand collaboration with universities and research institutions in Sarawak? I also want to know how the results of this research can be transferred to the agricultural industry, farmers and local entrepreneurs, especially including rural communities, so that they too benefit from the development of the nation's biotechnology industry. Next, I want to raise the issue of the STEM education access gap. This is my last point, Dato' Chairman. Under Item 020400 – National Science Centre, which receives an operating allocation of RM19.22 million in 2027 compared with RM15.46 million in 2026. Although there is an increase in allocation, geographical challenges and a lack of learning facilities remain constraints for schools in interior areas, particularly in Sarawak, indeed. The question is, how far has MOSTI's STEM Outreach programme reached schools in rural areas of Sarawak, including in the Batang Sadong area, particularly in terms of the number of schools and students who have benefited? And what is the ministry's plan to expand this STEM programme as well as robotics and exposure to digital technology in rural areas of Sarawak? In conclusion, I hope MOSTI will ensure that research results are successfully commercialised and that Malaysia becomes not merely a consumer but a creator of technology. That is all, thank you Dato' Chairman.
Thank you, the Honourable Batang Sadong. The floor is given to the Honourable Merbok.
Thank you, Dato' Chairman. I wish to debate Head P.30 Item 00800. Only one item. I want to take part in this debate, namely under the research and development (R&D) programme.
I see a rather worrying matter in the ministry's allocation for next year, namely the reduction in the research and development programme allocation from RM75 million to― this year, to only RM53 million for next year, as many other debaters have already touched on this item. This means a reduction of RM22 million, or about 29.3 per cent. I would like to ask the ministry whether it believes the nation's research and development needs are decreasing, or whether the ministry has reached such a high level of research capacity that R&D allocations can be reduced by almost one-third. In Merbok's view, this reduction must be given serious attention because R&D is one of the most important components in determining a country's ability to compete in a technology- and innovation-based economy. Dato' Chairman, I want to remind the House that Malaysia cannot rely forever on technology developed by foreign countries. We may be able to import machines, use high-technology equipment, use artificial intelligence systems, obtain automation technology and use various innovative products from abroad.
But the question is, how long do we want to remain in the position of consumers? Why do we not strengthen our capacity to become a nation that creates, develops and produces its own technology? I would like to draw the attention of the House to Malaysia's position compared with our neighbouring countries in terms of investment, research and development. If we look at a comparison of R&D expenditure as a percentage of GDP, Singapore has allocated around 2.2 per cent, Thailand around 1.2 per cent, while Malaysia is only around one per cent. These countries have not built their economic strength merely by importing technology. They invest heavily in research, development, expertise, innovation and the commercialisation of research results. Take Thailand, for example, which has been very successful in agriculture, Dato' Chairman. As a result, they are not only consumers of technology but also owners of technology, producers of high-technology products and exporters of innovation to the whole world. Malaysia also has the potential to move in that direction. We
have public and private universities, research institutions, academics, engineers, scientists, and many young people who have the ability to produce high-quality innovation. But the question is, does the government provide sufficient financial support to enable this potential to be turned into research results that can benefit the nation? Let us not allow our universities and researchers to have ideas, expertise and ability but be forced to stop or scale down research because of a lack of funds. Next, I would like to ask several questions that can be answered in writing. I would like to request the ministry to provide the following data. How many R&D projects has MOSTI funded over the last three years? How many projects have successfully reached the commercialisation stage? How many patents or intellectual properties have been successfully produced? What is the value of sales or economic output generated from research projects funded by the government? How many technology start-ups or local technology companies have been successfully established through such research results? And I am of the view that the ministry needs to have a mechanism to measure the return on R&D based on impact on the real economy, not just the number of projects approved or the amount of grants disbursed. Dato' Chairman, another matter that needs attention is the relationship between research institutions and the industrial sector. We do not want research to be carried out without taking into account the actual needs of industry. For example, the semiconductor industry requires expert manpower, technology, chip design, advanced materials and automation systems. The agricultural industry in turn requires seed technology, farm automation, smart farming and food production technology. Likewise, the health industry requires the development of medical equipment, technology, diagnostics and pharmaceutical innovation. Therefore, I propose that MOSTI strengthen the model of industry-joint research or industry-lead research, with respect. The government can provide matching grants to local companies that collaborate with local universities or research institutions to develop technology
that has commercial value. In this way, research results will not only meet academic needs but will also solve the real problems of industry and enhance the competitiveness of local companies. That is all, thank you.
Thank you, the Honourable Merbok. The floor is given to the Honourable Kepong.
Thank you, Dato' Yang di-Pertua. First, from January to October this year, only 29.8 per cent of narcotics cases at the Chemistry Department Headquarters were completed within the stipulated period. More than 70 per cent are late. Although Item 00200 allocates RM113.07 million for the development of the Chemistry Department next year, why are so many narcotics reports completed late? How many cases are still outstanding and how will this new allocation speed up laboratory work? Delays in forensic reports can slow down criminal investigations and trials. The public has a right to justice without unreasonable delay. Second, incorrect performance targets. Pages 305—350 wrongly record Malaysia's position as 34th with a score on the Global Innovation Index for 2025. The actual score is 40.6 and it rose to 41.8 this year. Why is the 2027 target still set at 41, which is lower than this year's achievement? Correct the error and update the target immediately. Third, Item 09000 allocates RM51.5 million for various equity injections. Who are the recipients of these equity injections? What is the government's shareholding? What are the investment conditions and what returns are expected? Present the performance of each investment to Parliament every year. Stop repeated capital injections into companies that fail and take legal action against those companies. Fourth, the Auditor General's Report 1/2026 found that MIMOS spent RM28.13 million on MyDigital ID without the approval of the designated committee. A total of RM14.09 million of development funds was also used for operating costs. The audit also recorded a balance of MOSTI research grants of RM14.33 million as at June 2025. What legal action has been taken against MIMOS? MOSTI subsequently returned RM540,000 from the RM14.33 million balance but applied to use the remaining RM13.79 million for a new programme. Has the Ministry of
Finance approved that application? If it has not been approved, when will that money be returned to the government? Fifth, the Atomic Energy Department and the Nuclear Malaysia Agency have been allocated RM154.62 million for next year. I agree that Malaysia needs nuclear safety controls, but why develop technology ourselves when it may be cheaper to buy or license it from abroad? The Nuclear Malaysia Agency reported that 19 products and services were commercialised between 2023 and this year. What is the actual sales revenue compared with the research cost? MOSTI should ask an independent party to review every nuclear research project. What is the cost? What are the results? And is it cheaper to obtain technology from abroad? Keep projects that are worthwhile and stop those that are wasteful. Sixth, the national drone industry. MOSTI through MRANTI targets a potential contribution of RM50.7 billion to GDP and 100,000 jobs by 2030. After four years, what is the actual value of export sales and jobs that have been produced? Every project must be proven effective, safe and cost-saving before it is expanded. That is all, thank you.
Thank you, the Honourable Kepong. The floor is given to the Honourable Shah Alam.
Peace be upon you, and the mercy and blessings of Allah.
Waalaikumussalam.
Peace be upon you, greetings of MADANI Malaysia. Thank you, Dato' Sri Chairman. I now move to the 2027 Budget Estimates under Vote B.30, Item 030000 – Technology Development, amounting to RM410 million, and Vote P.30, Item 00800 – Research and Development (R&D) Programme, with a total of RM53 million. I see that the role of the Ministry of Science, Technology and Innovation (MOSTI) is extremely strategic, because this ministry is not merely managing scientific research but is responsible for building the foundation of the nation's technological capability, industrial competitiveness and future economy. Therefore, I wish to raise four matters.
First, Malaysia must be a creator and owner of technology, not merely a user. In a global economic competition that is growing ever fiercer, a country's ability to master technology will determine its economic position and competitiveness. Malaysia cannot depend on foreign technology forever. We need to develop our own expertise, own intellectual property, produce chip designs, develop artificial intelligence (AI) models and create products that can be exported to international markets.
Therefore, I would like to ask the ministry: what are MOSTI's specific targets for increasing ownership of technology and intellectual property by local companies by 2030? Second, the gap between research and commercialisation. Malaysia has many universities. We have five research universities. We also have many research institutions and researchers capable of producing various innovations. However, we must also be honest. Many research outputs end up as academic journal papers or prototypes in laboratories without successfully entering the market. The question is, what is the actual value of research results that have been successfully commercialised and generate income for the country? Research KPIs should not be measured solely by the number of studies or journal publications but by sales value, products successfully marketed, jobs created and returns to the national economy. Third, AI and semiconductors as the nation's strategic technologies. We are witnessing major changes in the global economy due to the development of artificial intelligence. The question is, are we merely content to be users of foreign-made AI applications, or do we intend to have the capability to develop our own AI infrastructure models and applications? In the semiconductor industry, we also need to move to a higher level, particularly in chip design, advanced packaging and local technology development. Most importantly, the domestic market in the health, agriculture and other industries must give opportunities to local inventors and innovators to produce these products. This is because many of our industries provide services to developed countries, yet we do not fully provide that space for them. So, what is the strategy
of MOSTI to ensure that local companies are also able to master these technologies and the semiconductor industry value chain in our country? Lastly, Dato' Sri Chairman, this is the most important. This morning we spoke about environmental issues, floods and so on, which were debated at length. So, I want to link it to science, technology and also innovation. Shah Alam, as I mentioned earlier, we are very affected by the floods that occur repeatedly. In Shah Alam, the Shah Alam City Council (MBSA), we already have the Shah Alam Smart Monitoring System Integration Centre (IRIS), which uses monitoring facilities such as CCTV, drones, telemetry and IOI sensors to detect and control, and to provide alerts when floods occur. However, we need to go further than that, not merely monitoring but also making efforts to predict flood risks before they occur. So, imagine if we could integrate weather forecasts, rainfall intensity, river levels, drainage systems and traffic conditions through artificial intelligence. This means we can identify areas at risk of inundation early, warn residents, redirect traffic flows and deploy rescue teams before the situation becomes worse. This is what I am very confident about: MOSTI should work together with local authorities (PBT). For example, MBSA, the Department of Irrigation and Drainage (JPS), the National Disaster Management Agency (NADMA), universities and related agencies, to develop what I may call a pilot AI smart flood prediction and early warning system in Shah Alam. So, my question to the ministry is whether MOSTI is ready to make Shah Alam one of the pilot project locations for the use of AI and smart technology in urban disaster management, particularly regarding this flood issue. Finally, Dato' Sri Chairman, I want to emphasise that MOSTI's success should not be measured by how many research programmes are implemented or how much allocation is spent or reduced. Rather, we need to measure how many technologies have been successfully created, how many products have been successfully commercialised, how many highly skilled jobs employ local talent, and the extent to which the technology improves the living standards and well-being of our people. Thank you, Dato' Chairman.
Thank you, the Honourable Member for Shah Alam. I now invite the next debater, the Honourable Member for Kubang Pasu.
Assalamualaikum warahmatullahi wabarakatuh.
Waalaikumussalam.
Dato' Sri Chairman, MOSTI received an expenditure of RM1.29 billion for 2027. This amount is rather low relative to MOSTI being a very important ministry in leading the development of science, technology and innovation through R&D to make Malaysia a high-technology nation, a creator of technology and not merely a user of technology. Science and technology will determine the future of a developed and competitive economy. Next, Item 00800 Research Programme (STI), namely the Research and Development (R&D) Programme, totalling RM53 million. This is a decrease of RM22 million compared with 2026. R&D expenditure should increase, not decrease. I ask the Minister to elaborate on the R&D to be implemented in 2027, and where and why this amount has been reduced. Dato' Chairman, MIMOS. The amount allocated under B.30 Item 040500, Specific Programme. I ask the Minister to state what specific programmes will be implemented with this allocation of RM76.8 million. P.30 Item 01000 under the heading STI Commercialisation, totalling RM6.5 million. My question is what products will be commercialised in 2027 by MIMOS, and why MIMOS is not involved in STI research like NIBM and the Malaysian Innovation Foundation, whereas MIMOS should play a major role in R&D such as in semiconductors, rare earths, REE, AI and so on. I ask the Minister to list MIMOS's achievements in technology and product development, particularly in 2025 and 2026. I see that MIMOS is capable of playing a strategic role in leading technical leadership in— in Malaysia, like ITRI in Taiwan, the Industrial Technology Research Institute.
Next, MIGHT, Malaysian Industry–Government Group for High Tech. B.40, Item 040400, expenditure for 2027 RM15.3 million. P.30 Item 83000, expenditure RM227,090 million, down from the previous amount of RM131 million and the total of RM105 million. MIGHT receives a large allocation. With this amount, what specific programmes are implemented by MIGHT, and please state the STI commercialisation carried out as well as the outcomes or outputs achieved. Next, Malaysian Research Accelerator for Technology and Innovation (MRANTI). B.30 Item 040300, Specific Programme RM48 million. P.30 Item 18000, STI Commercialisation RM13.3 million. I ask the Minister to state what specific programmes are implemented and what STI commercialisation will be carried out. Dato' Sri Chairman, National Biotechnology Institute (NIBM) B.30 Item 040700, Specific Programme RM5.8 million. P.30 Item 00605, STI Research RM46 million, an increase from before, yes. I ask the Minister to state what specific programmes and SCI education will be implemented. Actually, we rarely hear about this NIBM. My question is what NIBM's achievements have been so far, and why NIBM and Malaysia Biotechnology Corporation are not merged into a single entity. Dato' Chairman, before concluding the debate, allow me to touch on several important matters concerning MOSTI. MOSTI, as a ministry given an important mandate to advance and strengthen the nation's science and technology, particularly in leading and providing leadership in realising the nation's recent developments and innovation so that Malaysia is on par with developed countries in R&D.
I hope that MOSTI can mobilise technical expertise in the field at the public higher education institutions (IPTA), particularly ITE Research University, educational institutions and industry, so that Malaysia becomes a nation of creators and high technology. Regarding REE or rare earths, NRES has been given responsibility for developing the upstream segment and the environment, while MITI is responsible for the midstream segment and the downstream end product. MOSTI, meanwhile, has been entrusted with realising the REE industry through R&D. The question is, which agency within MOSTI will implement this programme? I ask
the Minister to inform the current status of progress of the advanced packaging consortium launched last May. Lastly, Dato' Sri Chairman, what is MOSTI's role in implementing the STEM agenda, Science, Technology, Engineering and Mathematics? This is important because MOSTI's success will depend greatly on STEM achievement among upper secondary students. MOSTI should present the performance of agencies under MOSTI, such as MIGHT, IBM and so on, to this august House at least once a year. That is all, wabillahitaufik walhidayah. Assalamualaikum warahmatullahi wabarakatuh.
Waalaikumussalam. Thank you, the Honourable Member for Kubang Pasu. I invite the Honourable Member for Batu Pahat to speak.
Thank you, Deputy Chairman. I now move to Item 020600 – Academy of Sciences Malaysia (ASM). First, Batu Pahat refers to the ASM allocation, which increases from RM17.5 million last year to RM19.1 million next year. Batu Pahat takes this opportunity in this august House to thank the Academy of Sciences Malaysia (ASM) and MOSTI regarding the WBS project, Wireless Bridging System, which will be implemented in the Batu Pahat Parliamentary constituency, in the Senggarang and Rengit state constituencies (DUN), in collaboration with the Faculty of Electrical and Electronic Engineering, UTHM, Batu Pahat. So, I would like to record my appreciation to the team led by Professor Dr. Mohd Ramli bin Kamarudin and also Dr. Roshayati binti Yahya for the efforts that will be carried out shortly. Deputy Chairman, Batu Pahat refers to Item 83000, namely MIGHT, with an allocation of RM90 million next year. Batu Pahat seeks clarification on the effectiveness of MIGHT in strengthening the nation's high-technology ecosystem, particularly through strategic collaboration between government, industry and research institutions. First, regarding its utilisation, this RM90 million. How many projects or programmes will MIGHT implement throughout 2027? Which technology fields are given priority and what is the allocation for each programme? Batu Pahat also wishes to know, for every Ringgit of government allocation to MIGHT, what is the value of private investment
that is successfully generated through public-private collaboration? And what is MIGHT's mechanism for coordinating this collaboration, and how much local technology has been successfully commercialised throughout 2005 and 2006 and also in the future. Item 040500 – MIMOS Berhad. Second, Batu Pahat seeks clarification from the Minister regarding the allocation under the specific programme. What exactly is the scope of the specific programme under MIMOS Berhad allocated RM76.8 million, and what are the major projects to be implemented in 2027? Batu Pahat also wishes to know whether this allocation involves the proposed data centre to be developed by MIMOS? If so, where is the project location, what is the total cost and when will its implementation begin? Third, Batu Pahat refers to the allocation of RM16.5 million for commercialisation of technology involving MIMOS as well. Batu Pahat wishes to know how far MIMOS has succeeded in commercialising the results of local research and technology development. How many MIMOS technologies or products have been successfully commercialised so far, what is the value of commercialisation returns generated, and how many projects still have not successfully entered the market? Batu Pahat hopes the ministry can provide clear figures and achievements so that we can assess the returns on government investment in research, innovation and technology commercialisation. Batu Pahat wishes to touch on Item 03700 regarding the Malaysian Innovation Foundation (YIM), established in 2008 under MOSTI, which has been allocated RM5.5 million aimed at encouraging creativity and innovation among the people, including students, entrepreneurs, professionals and rural communities. Batu Pahat sees that our country indeed has many creative people capable of producing various innovations. However, the question is how far these innovations have been successfully developed into marketable products and provide economic returns to their creators. Therefore, Batu Pahat seeks clarification from the ministry. First, how many innovations by the people have been identified and assisted by YIM from 2024 to 2026? Of these, how many have been successfully commercialised and generated income for their creators? Second, what forms of assistance are provided by YIM to
local innovation creators, particularly in terms of financing, intellectual property registration, prototype development and access to markets? Third, to what extent has the YIM Programme been expanded to rural areas, including in Johor or in the Batu Pahat Parliamentary constituency? Does the ministry have specific targets to ensure that innovative talent in rural areas also receives equal opportunities? Fourth, what are YIM's key performance indicators for 2027, particularly the number of innovations to be commercialised, the job opportunities created and the economic value expected to be generated. Therefore, Batu Pahat proposes that YIM be strengthened through collaboration with any local university so that TVET institutions or cooperatives can help bring people's innovations to the market stage. Batu Pahat requests clarification from the Honourable Minister regarding YIM's actual achievements and the direction of this Foundation for 2027. That is all, thank you.
Thank you, the Honourable Member. I now invite the Honourable Member for Batu Gajah to speak.
Mr Chairman, I refer to Item 030200 – Funds and Commercialisation. I welcome the commitment of the MADANI Government in allocating RM41 million to Cradle Fund to implement the Malaysia Start-Up Ecosystem Roadmap and to support prototype development and local technology commercialisation. This effort is important in ensuring that Malaysia is not merely a technology user but is also able to produce competitive local technology companies. Mr Chairman, many young people have creative ideas with commercial potential. However, good ideas alone are insufficient if they face difficulties in obtaining capital to develop products and penetrate the market. In this regard, Cradle Fund plays an important role through the CIP Spark Programme, which offers grants of RM150,000, and CIP Sprint of up to RM600,000 to support technology commercialisation. My first question to the Minister is, from the RM41 million allocated to Cradle Fund, how much is channelled to the CIP Spark Programme
and CIP Sprint, and how many start-up companies are targeted to benefit in 2027? What is the rate of commercialisation success among grant recipients, particularly companies that have succeeded in generating income and obtaining follow-on financing? We want to ensure that innovation does not merely end as prototypes or research outputs but grows into products with commercial value that can create job opportunities. Mr Chairman, next I would like to touch on access to financing and the development of start-up companies outside the Klang Valley. In efforts to make Malaysia a regional technology hub, the development of the innovation ecosystem needs to be implemented comprehensively and not only concentrated in the major cities. The question is, do young people with innovative ideas in Batu Gajah get the same opportunities as those in Kuala Lumpur or Selangor? Talent and creativity do not exist only in big cities. Perak has many higher education institutions, an industrial sector and young people with potential to develop local technology enterprises. I believe that the government's efforts through Cradle Fund and the MyStartUp platform need to be further strengthened through collaboration with educational institutions, industry players and state development agencies.
My second question to the Minister is, how many start-up companies from the state of Perak have received Cradle Fund financing throughout the period 2023 to 2026, and what is the total value of financing that has been channelled? Does MOSTI plan to expand start-up development programmes, including grant application clinics, entrepreneurship training and investor networks in Perak, particularly to help young people in districts such as Batu Gajah? I hope these efforts can open opportunities for more young people to develop technology businesses in their own state. We want young people in Perak to be not merely job seekers but also to have the opportunity to create jobs through technology and innovation. Mr Chairman, I also refer to Item 09000 – Various Equity Injections. Financing is among the important factors in helping local technology companies grow from the initial stage to
...a stronger business sector. However, initial financing alone is insufficient if the company does not have access to follow-on capital to expand operations and enter new markets. I also take note that the Malaysia Startup Ecosystem Roadmap 2026 to 2030, or SUPER 2.0, targets 5,500 active startups and 5,000 high-skilled job opportunities. This target shows the Government's direction in making innovation the driver of the nation's economic growth. However, the success of the startup ecosystem should not be measured solely by the number of companies established. What is more important is how many companies are able to survive, grow and provide jobs with better income for the people. My third question to the Minister is, which agencies and programmes will benefit from the allocation of RM51.5 million under Item 09000, and how will this equity injection be coordinated with efforts to finance startups through Cradle Fund? I hope that every financing disbursed can produce sustained economic returns for the nation. Mr Chairman, I welcome the commitment of the Kerajaan MADANI that continues to give attention to the development of technology, innovation and the startup ecosystem through Budget 2027. We want Malaysia to be not merely a user of foreign technology but a nation that is able to create its own technology, produce innovative companies and generate economic prosperity for the people. That is all, thank you.
Thank you, Honourable Batu Gajah. I invite Honourable Jerantut.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings of peace.
Waalaikumussalam.
Thank you, Dato’ Sri Pengerusi.
I would like to touch on the overall allocation of MOSTI and Item P.30, Item 00800 – Research and Development (R&D) Programme. For the information of Mr Chairman and all, the overall allocation for MOSTI is only RM1.292 billion, which accounts for 0.112 per cent of the total expenditure of the Federation, or of our country. If we look at comparisons with other countries, Dato’ Sri Pengerusi, for example China, its total allocation for R&D is 2.8 per cent of GDP (KDNK). Our neighbouring country Thailand, which is known for its prowess in agricultural innovation, has 1.19 per cent of its total budget. Singapore has 4.65 per cent. Meanwhile Japan, which was our radar previously, has 1.18 per cent. So, from the perspective of allocation this may not be the same in terms of distribution, but what we can learn is in terms of the country's commitment to strengthen R&D in the nation. That is why Jerantut wishes to propose an innovation in the administrative system for the ministries and also the entire structure of the national administrative system, namely Jerantut proposes that all scattered R&D innovations, Dato’ Sri Pengerusi, because every ministry has its own R&D, be placed under, coordinated and reported by MOSTI through the National Science Council (MSN) chaired by the Most Honourable Prime Minister himself. That is one proposal, or alternatively, this coordination can be implemented by the National Science Development Committee (JKPSN) chaired by the Chief Secretary to the Government and comprising the Secretaries-General of the relevant ministries involved in innovation. Second, the same item, 00800 – R&D. Mr Chairman, I wish to raise the performance of the nation's Gross Expenditure on R&D (GERD), which is still stuck at around 1.01 per cent of GDP (KDNK). Far from the target of 2.5 per cent by 2030, and even lower than the achievement of 1.44 per cent in 2016. We are behind, Dato’ Sri Pengerusi. At the same time, the audit report also shows that although 87.4 per cent of R&D allocations have been spent, only 34.1 per cent of projects were successfully completed physically. This figure is below 50 per cent. Therefore, what concrete strategy does MOSTI have to boost GERD, especially through private sector participation?
Second, what is the cause of the gap between financial expenditure and the physical progress of these projects? And what is the monitoring mechanism to ensure that R&D funds really produce technology that can be commercialised? And third, to what extent will this year's development allocation be able to accelerate the development of the first local human vaccine? Nano technology and advanced materials are not merely about producing research but about building the technological and industrial capacity of the nation. Thirdly, Mr Chairman, a little about SMR. Item 030500 and 00900 – Malaysian Nuclear Agency and the development of nuclear services. We were informed from the Minister's statement on 26 October that the Government is carrying out four major studies within 12 months before finalising the direction of technology and the development of the nation's nuclear power plant. Congratulations to the ministry. A step that is very much encouraged. Only I would like to seek some clarification. First, will these four SMR-related studies use the existing allocation of the Malaysian Nuclear Agency or through the PETRA allocation, or is there a specific allocation from other ministries? Second, if these studies require technical expertise, safety assessment, talent development and technology evaluation, is the current allocation sufficient to ensure the study results are truly of quality and comprehensive? And finally, thirdly, what is the clear timeline after these four studies are completed? Will the Government proceed directly to policy decisions and an implementation plan, or will we once again open new studies? Study after study but no action. Therefore, we hope this matter can be implemented because it can strengthen the nation's financial capacity if we have new energy sources. As a closing, Mr Chairman, this is Jerantut's second proposal on innovation in the administrative system. If we want to accelerate the rate of commercialisation of local technology, the Government must restructure the governance of the nation's intellectual property (IP), which is now trapped in silos and overlapping powers, Dato’ Sri Pengerusi. One, MOSTI as the provider of R&D funds. Second, the Ministry of Domestic Trade and Cost of Living (KPDN) through MyIPO for registration matters. And third, the Ministry of Higher Education (KPT), which oversees public universities. Three ministries are involved.
The weakness of coordination and bureaucratic red tape has caused thousands of patents resulting from public research grants to merely sleep on paper without penetrating the market. In stark contrast with China's aggressive move, which amended its technology transfer law to give autonomy to universities, licensed patents directly to industry, provided incentives of at least 50 per cent of commercial results to researchers, and carried out a massive audit to eliminate more than one million academic patents directly to private companies. Therefore, finally, I urge the ministry to elaborate on what integrated joint mechanism between KPDN and also KPT in Budget 2027 will be used to eliminate this wall of bureaucracy and reactivate local patents that are still dormant, so that the nation's R&D investment truly generates economic returns. That is all, thank you. Assalamualaikum.
Waalaikumussalam. Thank you, Honourable Jerantut. I invite Honourable Keningau.
Thank you, Dato’ Yang di-Pertua. I now move to Item 030000 – Technology Development, RM410.8 million for technology development. I would like to ask how much of this allocation is earmarked for technology development activities in Sabah. Keningau hopes that from this allocation the Government will increase and intensify efforts to reduce the science and digital gap between Malaya and Sabah, which is backward and underdeveloped. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] Among others, Keningau wishes to propose that, firstly, the Government promote science, technology and innovation activities in Sabah, especially among youth and schools, to attract interest in learning. Secondly, the construction of a National Planetarium and a National Science Centre in Sabah for exposure to science, technology and innovation activities and development in Sabah. Thirdly,
encourage and increase R&D funds and commercialise results of science, technology and innovation specifically for Universiti Malaysia Sabah and entrepreneurs as well as for startups in Sabah. Item 030600, RM73.3 million for the Malaysian Space Agency. Keningau would like to ask what is the rationale of the Government's planning and incentives for the establishment of a space launch hub in Sabah. Item 040700, RM52.8 million for the National Institutes of Biotechnology Malaysia. Keningau would like to ask, what is the focus of biotechnology activities for Sabah from this RM52.8 million allocation, considering Sabah has potential in agriculture, fisheries, livestock and flora and fauna which will become the basis of the food and biotechnology industry. Item 00800, RM53 million for the Research and Development (R&D) Programme. Keningau also wishes to ask from this allocation how much is the total for R&D in Sabah, because R&D is very important in science and technology. And I feel the allocation for R&D is insufficient in the amount allocated. That is all, thank you.
Thank you, Honourable Keningau. I invite Honourable Sri Gading.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Madam Chairman. KP.30, Code 30, 00800. The budget for 2026 of RM75 million drops to RM53 million in 2027, where this reduction is related to the programme allocation in research and development being reduced by RM22 million. This reduction is rather worrying considering R&D is an important foundation in building the technological and innovation capacity of a nation. In a global competitive environment that is increasingly dependent on new technology, why has this budget been reduced? The Government should allocate greater investment in research, not reduce support for fields that are the drivers of the economy of the future. Malaysia also still faces challenges in producing its own technology. Since this reduction is based on shortfalls, then foreign expertise especially in the fields of semiconductors, artificial intelligence, biotechnology and strategic technology. The question is whether this reduction in allocation is due to
certain research projects having been completed or there being a change of priorities in MOSTI's financing strategy? The ministry needs to explain how the continuity of existing research projects will be ensured so that the reduction in funds does not cause these highly potential projects to be disrupted. In addition, the success of research should not be measured solely by the number of studies or academic publications. MOSTI needs to prove that the money invested produces technology, products and solutions that can be utilised by industry and be of use to the people. The most important matter is to ensure research results are not merely kept in laboratories or stopped at the prototype stage without the opportunity to be commercialised. Questions to be raised. How much research is still at the prototype stage and has not yet succeeded in being commercialised? Second, what is the ministry's mechanism to ensure research that receives government funds really solves industrial and community problems? Thirdly, will this reduction in allocation affect the continuity of ongoing research projects? The second point, Code P.30 01100 where its allocation increases from RM7 million last year to RM16.5 million in 2027 where development for MIMOS Berhad rises by RM9.5 million from RM7 million. MIMOS has an important role in local technology development especially in the fields of semiconductors, microelectronics, artificial intelligence and digital technology. The capacity of institutions such as MIMOS is very important to ensure Malaysia is not merely a centre for assembling foreign technology products but is also able to develop technology and produce its own intellectual property. Malaysia is now striving to improve its position in the semiconductor industry and the global technology supply chain. However, this effort needs to be supported by strong local research, technology development and the development of highly skilled manpower. MIMOS should be among the institutions that help local companies improve technical capacity and develop products with higher added value. This increase in allocation needs to be utilised to develop technology that can truly be used by the local industry.
The ministry needs to explain the results of MIMOS research that have been successfully commercialised and the extent to which local companies have benefited from them. MIMOS's success should not only be assessed based on the number of research projects or patents registered but also based on the amount of technology used commercially and the economic value successfully generated. A matter from Sri Gading. What technology research projects will be given priority by MIMOS in 2027? How many patents or intellectual property have been registered by MIMOS in the last five years? How many local companies have used MIMOS's technology or expertise in their operations? Of the five research universities, how many research projects specifically to help agricultural development for national food security, and how many projects have been successfully produced especially in paddy?
Thank you, Honourable Sri Gading.
Okay, thank you.
I invite Honourable Padang Rengas.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings of peace. Thank you, Madam Chairman. Padang Rengas rises to debate the allocation of the Ministry of Science, Technology and Innovation (MOSTI) for the year 2027, particularly Maksud B.30 and Development P.30.
Overall, MOSTI receives an allocation of RM1.292 billion, which is RM775.46 million for operating expenditure B.30 and RM516.93 million for development P.30. The overall increase is only 1.3 per cent compared with 2026. I would like to raise five matters for the ministry's explanation. First, Item 030000 – Technology Development. An allocation of RM410.84 million is given to this programme. However, does that allocation
truly increase local technological capacity especially in the fields of artificial intelligence (AI), semiconductors and high technology? Why has the allocation for education and R&D development under P.30 Item 00800 been reduced by 29.3 per cent to RM53 million? I propose that MOSTI set clear targets for economic returns, technology transfer and commercialisation for every research fund. Second, Item 040000 – Specific Programmes. An allocation of RM212.9 million is maintained without any increase. MIMOS Berhad receives RM76.8 million while NIBM receives RM52.8 million and MRANTI RM48 million. The question is, what specific key performance indicators (KPIs) are required of each agency to ensure government grants produce technology products and high-value job opportunities? I also ask MOSTI to explain the follow-up action on the findings of the Auditor General's Report (LKAN) Number 1/2026, particularly relating to the financial management of MIMOS and the MyDigital ID project. Madam Chairman, thirdly, Item 00800 – Research and Development Programme. LKAN Number 1/2026 reports that MOSTI's R&D and C&I expenditure rate only reached 78.1 per cent, which is among the lowest performance of the audited ministries. More worrying, there is an unreturned grant balance of RM14.33 million and an outstanding balance of RM5.5 million from terminated projects that has not yet been collected. What action will the ministry take to recover that money? Why are new allocations continuously given when weaknesses in the management of previous funds have not been fully resolved? Fourth, Item 01100 – MIMOS Project. The development allocation for MIMOS increases by 135.7 per cent to RM16.5 million whereas LKAN reports that RM28.13 million was spent without approval from the competent committee and RM14.09 million of development funds was used for operating costs. I want the ministry to explain what new control mechanisms have been introduced and whether the release of the 2027 allocation will be conditional upon compliance with the audit recommendations? Fifth, capacity to absorb development allocations. For P.30, the Chemistry Department of Malaysia project receives RM113.07 million, MIGHT, RM90 million while the project for repair and maintenance of buildings and equipment receives RM56 million. However, development expenditure— the actual development expenditure of MOSTI in 2025 for the P.30 project list was only RM118.3 million. I
propose that the ministry table the implementation and expenditure schedule on a quarterly basis so that Parliament can monitor the progress of each project. As a closing, Mr Chairman, my position is clear. We support the development of science, technology and innovation because this is the foundation of the nation's economic competitiveness. However, large allocations without measurable results will only become figures in the budget document. I urge MOSTI to strengthen governance, increase the rate of R&D commercialisation, ensure transparency of agency grants and give priority to the development of local talent and technology. Finally, the people want to see research results become products, innovation become industry and technology become a source of national income. With improvements and commitment to the matters raised, I support the MOSTI allocation for the year 2027. That is all, thank you.
Thank you, Honourable Padang Rengas. I invite Honourable Bakri.
Thank you, Madam Chairman. Item 030100 – Strategic Technology. Madam Chairman, yesterday Malaysia and France exchanged memorandum of understanding documents on critical minerals. This cooperation has opened further opportunities for us to master rare earth processing technology. Her question is, we need to know now, how much more, yes, how much raw material can we extract or supply, especially for these materials— these rare earth materials that are extracted without causing any impact on water resources and also forests. Although I expect the Minister will be the one to answer. He said we now have new technology. So, among them is the ISL method which uses chemical solutions to extract rare earths from the ground. I want to share an experience at a former mine in Guangzhou, China. The soil in the mine tailings area is still very acidic with a pH of around 3.9 even though the mining had ended 12 years ago. The high ammonia level, meanwhile, is between 12 to 40 times the natural level. Therefore I request the Government to provide certainty,
how much is estimated, the stock that can be extracted without affecting forests and water resources? Madam Chairman, MOSTI has allocated almost RM7 million to UMPSA through the EYE-TREE project. What method has been tested to reduce the risk to land and groundwater, and when can on-site testing begin? We want to develop the potential of non-radioactive rare earths. But it is expected that about 94 per cent of the estimated rare earth resources are within permanent forest reserves, to the extent that there have been requests from certain Chief Ministers asking that rare earth mining activities in permanent forest reserves be permitted. This is something very frightening, and I am worried that the forests will be destroyed and the water resources will be contaminated. So, I want to ask, how many tonnes a year can be produced from these sensitive outer areas? Beyond these sensitive areas, and if the supply is insufficient, the government should reassess the scale for this industry so that we give the highest priority to preserving forest reserves and water catchment areas. This is a priority that cannot be compromised. Madam Chairman, Item 030200 – Funds and Commercialisation. In Budget 2027, we allocated RM41 million to Cradle for the startup ecosystem development plan as well as prototype and commercialisation grants. How much of this amount will be channelled through CIP SPARK and CIP SPRINT, and how long must these companies wait for the first payment after a grant is approved?
On 4 March this year, MOSTI informed the Dewan Negara that the commercialisation rate of CIP Sprint recipients reached 100 per cent. A very encouraging figure. How many companies were taken into account, and what criteria were taken into account to be considered successful? The performance of companies assisted by the government must be compared with participants of private programmes and with companies that receive no support of this kind at all. I request that MOSTI provide data by scheme and year of approval, and three years after the grant ends, how many companies are still
operating? And how many have recorded recurring sales or have obtained investment from the private sector? For companies that already have a prototype but have not yet obtained their first customer, who will help them move to the next stage? A think tank once raised the risk of overlap between government financing schemes. So, for companies that have built a prototype through CIP Spark but have not yet obtained their first paying customer, what assistance does Cradle provide to bring their product to market? Before funds are approved, does Cradle check other agencies' payment records to ensure the same costs are not financed repeatedly? Here I propose...
Sila gulung.
...I propose that the government update the repayment conditions for Cradle grants. Companies that are already able to repay part of the grant can help finance the next group of entrepreneurs. The first...
Honourable Member, your time is up.
...Finally, regarding the RM2.5 million collected without approval according to the Auditor General, I request that the Minister explain whether that money has been returned to the 14 companies involved and, if not, what the government's decision is regarding that collection. Thank you.
Thank you, Honourable Bakri. I invite the Honourable Member for Putrajaya.
Thank you, Mr Chairman. Item 030000 – Technology Development, 04000 – Special Programmes, and also under the meaning of development: STI Services Development, STI Research, STI Commercialisation. Mr Chairman, yesterday the President of France came to Malaysia, and among his main intentions was to discuss the supply of REE, or rare earth supply, from Malaysia. Previously Malaysia signed a reciprocal trade agreement
with the United States, and among the key components of that agreement is also related to rare earths, or REE, in Malaysian soil. In addition, there have been discussions with several other world powers relating to these REE. Mr Chairman, the world powers' interest in these rare earths reminds me of the story of tin ore produced in Tanah Melayu about 120 years ago. In 1900, Malaya or Tanah Melayu produced about 55 per cent of the world's tin ore. 55 per cent of the world's tin ore at that time came from Tanah Melayu. The colonisers at that time plundered this tin ore. They took the benefits of tin mining back to their own countries. Some of us did benefit, and what they left behind after 120 years, after tin mining began, 50 per cent, 55 per cent of the world's tin supply came from our land. After 120 years, what remains? What remains for us are only mines. Deep mines in several states. Some mines have been used to build housing areas, filled in and turned into housing areas. So we inherited something that we see today happened 120 years ago. That is why, when I see the interest of countries in the world in our rare earths, I feel very worried. Moreover, 80 per cent of rare earth deposits in the states of Terengganu, Kelantan, Perak, Kedah and Pahang are located within forest reserves, 80 per cent are located within forest reserves. Until today, our country has rare earth supply, but there is no method, no approach, no technology to process it. The country that dominates rare earth processing technology is China. Apart from China, there are several other countries including Australia and the United States. Recently, the government allowed the export of up to 100 metric tonnes of raw rare earths for R&D1 purposes, with the condition that there is a commitment to build and develop processing facilities in Malaysia within three years. My question is, to what extent is MOSTI actually involved in R&D related to rare earth processing? Is there any cooperation with universities in Malaysia relating to this rare earth processing? We do not want a situation where private companies benefit
and a large portion of the shareholders of these private companies also come from abroad. In the end, what is left in our country, as Bakri mentioned earlier, what will be left in our country later, are catchment areas that have been severely damaged, water supply that has been severely damaged, and the benefit to Malaysia is very limited. That is why I request MOSTI to place specific emphasis on the government looking at and mobilising all the research manpower available in Malaysia. It is not impossible for us, together with several other parties, to obtain processing approaches and technologies as well as other technologies related to rare earth output. We do not want, 120 years from now, our grandchildren sitting in this House talking about what the story of tin ore was 120 years ago. Next, Mr Chairman, I would like to touch briefly on the use of technology to reduce dependence on foreign workers. This relates to Item 020200, STI Culture-building. Today, MOSTI must play a major role as the pillar in the government in mobilising all agencies to foster the use of technology. Because with the use of technology, we can reduce dependence on foreign workers. I will give an example, finally, Mr Chairman. At present, if we look at large open areas, to cut grass we still use a dozen foreign workers just to cut grass. Yet in this world, there are various technologies that can be used to cover such an area in just half an hour, but because this technology is seen as expensive and foreign workers are seen as cheap, companies take the approach of not using technology. So I request MOSTI to look into this matter, and the same thing happens in Putrajaya, my constituency. On hill slopes, perhaps workers with brush cutters can be used, but for open areas, using 20 workers to cut grass is a loss in the context of using technology to reduce dependence on foreign workers. Thank you, Mr Chairman.
Thank you, Honourable Member for Putrajaya. Now I invite the Honourable Deputy Minister of MOSTI to respond for 20 minutes.
Terima kasih.
The Honourable Member may respond to the issues raised by the Honourable Members who are still in the House. For those who are not in the House, they may respond in writing.
Thank you, Madam Chairman. First, I seek your permission, Madam Chairman, to answer some of the earliest questions because of the problem with some of the last debaters. The answers I am still waiting to complete, but those I can give early, allow me to proceed...
Silakan.
...Because many of them raised several important issues that we need to explain in the House. Thank you.
Madam Chairman, thank you for giving me the opportunity to respond to the issues raised by the Honourable Members during the Committee Stage debate on the Appropriation Bill 2027 on this occasion. My highest appreciation to the Honourable Members for their scrutiny of the allocations and the implementation of programmes in 2027 under the Ministry of Science, Technology and Innovation (MOSTI). This august House's scrutiny of the use of public funds is an important part of efforts to ensure that every approved allocation can be utilised effectively, transparently and responsibly. Madam Chairman, for 2027, MOSTI has been allocated RM1.29 billion. This amount increased to RM16.49 million, which is 1.29 per cent compared with the previous allocation of RM1.28 billion in 2026. Of this amount, RM775.4 million is operating expenditure. The largest component is grants and fixed charges amounting to RM282.5 million or 36.5 per cent, which channel grants to agencies such as MIMOS, MRANTI and NIBM. This is followed by emoluments amounting to RM277.16 million or 35.7 per cent. Services and supplies amounting to RM885.94 million or 24.2 per cent, and assets amounting to RM29.28 million.
Development expenditure totals RM516.93 million directly without the loan component. This amount is on par with RM516.22 million in 2026, thereby maintaining the momentum of project implementation. This allocation will finance 61 projects under the Second Rolling Plan of the Thirteenth Malaysia Plan, namely 43 continuing projects worth RM402.51 million and 18 new projects worth RM114.42 million. These projects cover STI services development, 34 projects; STI research, 11 projects; and STI commercialisation, 16 projects. Madam Chairman, allow me to proceed to answer the questions raised by the Honourable Members. The Honourable Member for Raub, Madam Chairman, the construction of the PDF and compliance with Lynas's licence conditions are monitored periodically by the Atomic Energy Department (JTA). Construction of the PDF has reached 79 per cent as of 31 October 2026, and 1.46 million metric tonnes of WLP residue have been transferred into it. The activity of transferring WLP residue from the Residue Storage Facility (RSF) facility to the PDF is monitored by the Atomic Energy Department or JTA and reported periodically by Lynas to JTA to ensure the safety and radiation protection of the public and the environment are always assured. JTA has carried out monitoring and sampling in the surrounding environment. This monitoring data can also be accessed by the public in real time through the MOSTI website and erms.atom.gov.my. The decision to consider extending the licence period by 10 years was made based on a comprehensive technical, legal and compliance assessment by the Atomic Energy Department, and it is subject to additional stricter licence conditions. If there is non-compliance with the conditions imposed, suspension or revocation of the licence may be carried out by the Atomic Energy Department at any time under the provisions of the Atomic Energy Licensing Act 1984 [Act 304]. Within the first five years, Lynas is required to carry out modifications to the facilities at the Lynas Advanced Materials Plant (LAMP) Gebeng, to ensure the activity concentration of residue water leach purification (WLP) can be reduced to a level below the control limit of Act 304. Lynas has submitted planning documents for the purpose of modifying the C&L process by using a low temperature method compared with the current process. The government affirms that radiological safety, public health and environmental protection are priorities. This extension is accompanied
by strict scheduled controls and clear compliance as well as technical conditions to reduce and ultimately stop the production of radioactive residue. In addition, to ensure compliance with Act 304 and the licence conditions issued to Lynas, JTA also carries out periodic radiological and environmental inspections and monitoring as well as enforcement actions to ensure that safety standards continue to be complied with throughout the operating period of the facility, including the PDF facility. Based on radiological and environmental monitoring carried out by JTA at this time, operations are shown to be under control and radiation exposure measurements are below the prescribed limits. Madam Chairman, and for the information of the Honourable Member, any activity processing rare earth elements (REE) in Perak or other states that contains naturally occurring radioactive material or NORM with an activity concentration exceeding one becquerel per gram or Bq/g is subject to regulation and licensing by the Atomic Energy Department or JTA under the Atomic Energy Licensing Act 1984 [Act 304], regardless of the investor or technology source, to ensure the safety and management of radioactive materials. On the question raised by the Honourable Member for Kuala Terengganu, Madam Chairman, R&D allocations in Malaysia are distributed across ministries on a cross-ministerial basis and are not focused solely on the Ministry of Science, Technology and Innovation (MOSTI). Although there is a reduction in MOSTI's grant allocation in 2027, the government is committed to continuing to strengthen national R&D investment through a more comprehensive and integrated approach. This effort does not depend solely on public allocations, but also places emphasis on increasing private sector R&D investment, strengthening strategic collaboration between government, industry and academia, and optimising R&D funding sources in a more targeted manner to produce higher impact on the development of the nation's technology, innovation and economy. Another strategic measure taken by the government is the implementation of the Malaysia Science Endowment (MSE) initiative, in which the Academy of Sciences Malaysia (ASM) was appointed as the implementing agency, as agreed by the
Cabinet Meeting on 20 December 2023 and approved by the Dewan Rakyat sitting on 4 August 2022. The main purpose of establishing MSE is to serve as a national alternative fund specifically for the financing of grants and scholarships in the fields of science, technology and innovation. In addition, MSE will also play a responsible role as a platform to obtain funds from within and outside the country, including grants from industry, international funds, endowments, donors, angel investors, crowdfunding and self-funds, as supporters of the nation's aspiration to reduce dependence on the development allocations of the Federal Government and to increase the impact of R&D on economic growth and the well-being of the people. Next, Madam Chairman, the issue raised by the Honourable Member for Kuala Terengganu, namely the NSTI or National Technology and Innovation Sandbox initiative, which has been spearheaded by MOSTI with the involvement of implementing agencies including MTDC and MRANTI, has been implemented since 2020. NTIS provides a controlled and safe testing space for innovators and technology entrepreneurs to test and validate products, technologies or services in a real environment, including with support to address related regulatory requirements. This initiative accepts solutions at technology readiness level TRL 6 and above.
Madam Chairman, MOSTI, through the Malaysian Nuclear Agency, has also completed the preliminary study on MPR and is drafting the MPR blueprint as a basis for strategic planning in the medium and long-term planning phase for the period 2026 to 2030, which was drafted under the fourth strategic pillar of the National Nuclear Technology Policy (DTNN), before realising the development of the facility. Although the use of small modular reactors (SMR) is not specifically stated in the DTNN 2030 policy, MOSTI indirectly supports the development of talent in nuclear technology. Among the initiatives identified are the preparation of a National Nuclear Talent Development Plan guided by technological developments and future readiness. As the Honourable Member is well aware, Malaysia did not start from zero in terms of knowledge, experience and use of nuclear technology, the research nuclear reactor, namely the TRIGA PUSPATI Reactor or RTP with a power of 1MW, has
operated for 43 years since its establishment. The operation, maintenance and research of this nuclear reactor system have been carried out entirely by certified and accredited local personnel without relying on external expertise. The Honourable Member for Betong also touched on several matters. In response, the Ministry of Science, Technology and Innovation (MOSTI) offers R&D funding to those who are interested in carrying out experimental R&D projects aimed at developing new products or innovations. At present, the priority areas for MOSTI's R&D fund are based on Framework 10 — 10 Malaysia Science, Technology, Innovation and Economy or MySTIE, in which biodiversity, new energy and agrotechnology are among the main pillars of this framework. This framework aims to enhance Malaysia's global competitiveness by ensuring that STIE development can stimulate socio-economic growth. For applications in 2026, a total of 529 applications were received from across the country. Only two PEMACU 2.0 grant applications were received from Universiti Malaysia Sarawak. At this time, no projects have been approved for applicants from Sarawak for the PEMACU 2.0 grant. The process of evaluating R&D fund applications must be carried out transparently, based on merit and guided by the technical criteria that have been determined, including suitability of scope, implementer capacity, project feasibility and potential impact. In this regard, MOSTI welcomes applications from Sabah and Sarawak for R&D funding that will be offered during the Thirteenth Malaysia Plan period. The R&D allocation applied for in 2027 is based on the need for payment of project commitments, or the payment schedule follows the implementation of project milestones. Overall, this allocation aims to support the implementation of research and development activities and the provision of facilities and related needs according to the approved project scope. Next, the Honourable Member for Betong. For the information of the Honourable Member, the increase in the National Institute of Biotechnology Malaysia (NIBM) development allocation from RM25.395 million in 2026 to RM46.401 million in 2027 is the continuation of five DE RMK13 projects, namely MyGenom Phase 2, in vivo laboratory renovation, MyBio@Fit, MyPhytolead, and the national vaccine production development and strengthening programme.
The increase of RM21.006 million or 82.72 per cent, mainly involving the MyGenom Phase 2 Programme, from RM10 million in 2026 to RM30 million in 2027, is in line with the needs and implementation phase of the approved project.
Honourable Deputy Minister, there are four minutes left. If possible, please answer a little about rare earths. I think there are several Members of Parliament who asked in the House, including Bakri and Putrajaya. Touch on it a little, we want to get— because, this is an important issue I think needs to be recorded in this House. Thank you, Honourable Minister.
I— tinggal empat minit jer? Okey, I lompatlah ya. [Ketawa] I go to siapa ini— yang tadi awal.
Don't forget Jerantut. All important issues, not just the rare earths issue.
Batu Pahat, yes. Is there a Batu Pahat?
There is, there is, there is.
[Laughter] Okay. I will answer only what I want to answer. As long as there is one, we will answer, yes, Honourable Member. Okay. Madam Chairman, regarding the question raised by Batu Pahat, I will answer as follows, yes. The increase in the operating expenditure (OPEX) allocation for the Academy of Sciences Malaysia (ASM) that was raised, amounting to RM1.6 million, is for 2027 to cover the increase in emolument costs following the adjustment of the Public Service Remuneration System (SSPA), the increase in office space rental costs, and also to cover the operating costs and implementation of MSE activities, or Malaysia Science Endowment. The Honourable Member also mentioned another matter, namely the scope of the allocation raised, which is RM16.5 million in Budget 2027, allocated for three MIMOS development projects. The breakdown is RM10 million for the National Quantum Intelligence Programme, RM5 million for the development of blockchain technology and deepfake detection, and RM1.5 million for the development of an elderly health support platform. To answer whether it is used for the development of the MIMOS data centre, the answer is no. Next, Batu Pahat also raised that the Malaysian Institute of Microelectronic Systems (MIMOS) has commercialised 43 technologies resulting from local research and development, with cumulative commercialisation revenue of RM209.83 million recorded up to 2023. As of September 2026, MIMOS has also
licensed 17 technology packages to industry. Among their uses are tracking assets within buildings and managing energy consumption in cooling systems for technologies that are still in the process of entering the market. MIMOS has 29 versions of technology release packages available for transfer and commercialisation to industry. The Honourable Member's request for a clear return on investment figure has been noted and will be given attention by the ministry. There are still some other questions, but I will go to the other YBs, I will answer. Those are beyond the questions raised, which I did not have time to mention because the Honourable Member for Putrajaya spoke, I have answers. I will provide them in writing, yes. Batu Pahat, okay? [Interjection] Alright. I will go to Shah Alam, the one close to me [Laughter] Madam Chairman, in efforts to make Malaysia a creator and owner of technology by 2030, MOSTI, through the Intellectual Property (IP) Commercialisation Policy 2021–2025, targets a 20 per cent increase in the commercialisation of IP arising from government R&D to strengthen the utilisation of local innovation and technology. This policy also provides a mechanism to facilitate the transfer of IP ownership to local companies through approval by the ministry-level committee. The potential of local intellectual property is objectively assessed based on the IP assessment framework guidelines to determine its monetary value and marketability. The commercialisation process is also subject to assessment by MOSTI to ensure the marketability and technical potential of the IP concerned. In relation to— in answering the target raised by the Honourable Member for Shah Alam, the 2030 target has not been finalised. The Malaysian Research Accelerator for Technology and Innovation (MRANTI) has held stakeholder engagement sessions in 2026, and the proposed development of the Malaysia Commercialisation Indicator Framework (MCIF) will be presented for discussion with KE in the near future. And I go to the— the next question, YB Shah Alam, we will provide it in writing, yes. I go...
Honourable Member, time is up.
Oh, yes. I want to answer Jerantut until— if that's the case, I will go to my closing, yes. [Interjection] Yes, closing, he has closed it.
And Gerik too, yes, written reply.
Therefore, Madam Chairman, before concluding, I would like to inform you about the questions raised by the Honourable Members, which we will answer in writing, yes. In examining especially the ministry's allocation, the matter that should receive attention is not only what is to be implemented, but also how its implementation can produce value for the country. Advances in science, technology and innovation certainly require continuous investment, but such investment must be accompanied by clarity of purpose, effective coordination and evaluation of the outcomes of implementation. In this way, we can ensure that efforts to develop the nation's technological capability continue to have a clear relationship with the needs of industry and also the lives of the community. MOSTI will continue to give attention to the responsible use of resources, the strengthening of cooperation among stakeholders, and efforts to connect the results of research and technology development that require time before their full benefits can be realised. Both are important, but they must be evaluated based on the goals of progress and the implementation status of each. Madam Chairman, ultimately, the meaningful measure of an allocation is not merely whether the money has been spent or the programme has been carried out, but whether its implementation truly brings us closer to the intended outcomes. That is the responsibility that MOSTI must continue to give attention to in implementing the Budget 2027 allocation, so that technological progress not only grows in terms of capability but also brings meaningful change to the nation and the people. I once again record my appreciation to Madam Chairman and all Honourable Members for their attention and consideration of the ministry's allocation. That is all, thank you.
Thank you, Honourable Deputy Minister.
Honourable Members, the question is that the sum of RM775,462,200 for Head B.30 of the 2027 Operating Expenditure Estimates forming part of the Schedule be agreed to. [Question put and agreed to] [Head B.30 ordered to form part of the Schedule]
The question is that the expenditure stated in Head P.30 of the 2027 Development Expenditure Estimates be approved. [Question put and agreed to] [Head P.30 forms part of the Estimates] [The House resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair
Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Thursday, 19 November 2026.
[The House was adjourned at 7.23 p.m.]