Dewan Rakyat · 19 November 2026
15th Parliament, session 5, meeting 3 · not final · 592 turns · 51,533 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Sitting]
Time for Questions to MinistersQuestions
I invite Tuan Wan Razali bin Wan Nor, Kuantan.
Thank you, Madam Speaker. Assalamualaikum warahmatullahi wabarakatuh. So, before the questions, I would like to recite a pantun. This week is pantun week, yes. I would like to request permission to recite a pantun. The victory of Negeri Sembilan and Melaka is proof of unity; The Malaysian people welcome it with full gratitude; The Kuantan question will need an answer; I hope the Honourable Deputy Prime Minister will provide an explanation. Thank you.
Baca soalan.
1. Tuan Wan Razali bin Wan Nor [Kuantan]: Asks the Prime Minister to state what the Government's preparedness is in terms of the readiness of rescue teams, assets and welfare assistance, including financial assistance, in facing disasters during the Northeast Monsoon (MTL) currently affecting the country, and whether the Government will provide incentives to any NGOs or volunteers who are also involved in helping flood victims. Thank you.
Please, the Honourable Deputy Prime Minister, to reply.
Thank you. I did not have time to respond in verse, but never mind, the matters we have agreed on, I will carry out, God willing.
NADMA, the National Disaster Management Agency, is the Government's main agency for preparing all facilities and strengthening preparedness in an integrated manner through an approach, with permission, of whole-of-government and also whole-of-society, to ensure that the response agencies and we involve technical agencies, state and district authorities and strategic partners are always at the appropriate level of preparedness to face the Northeast Monsoon this year and next year. In terms of human resources, more than 100,000 personnel from response agencies and technical agencies have been mobilised to face this MTL. This strength is also supported by various assets and operational equipment. Among them, nearly 2,500 boats, more than 2,000 four-wheel drive vehicles or four by fours, more than 1,100 lorries, 28 aircraft and more than 35,000 units of safety jackets. Apart from that, 101 assets of the Public Works Department (JKR) are also on standby. The Drainage and Irrigation Department (JPS) has prepared 300 units of mobile pumps, 30 units of generator sets or gensets, 15 crane lorries placed at state and district levels, and bailey bridges have been prepared by NADMA. For now, a total of seven sets. JKR itself has 31 sets of bailey bridges. The Malaysian Armed Forces (ATM) engineering regiment has 11 sets and six sets are in the procurement process by NADMA. In other words, we also prepare bailey bridges. Apart from that, we also prepare data, namely that we have identified 3,045 flood hotspot locations and we have also looked at 31 landslide hotspot areas, of which 90 are categorised as very high critical, 92 as moderately critical and 81 as low critical, in addition to the early flood warning system that we have prepared, and preparedness in terms of welfare and assistance to flood victims. For NGO involvement, we have mobilised many NGOs, namely at present 159 NGOs that have been placed on standby to be deployed to help flood victims throughout the country.
Kuantan.
Thank you for the answer given. So, as we in the East Coast are commonly accustomed to, this flood issue is very, very close or very, very worrying if it happens as expected this year. We pray that this matter does not happen, God willing. So, my supplementary question is, what is the coordination mechanism to mobilise the involvement of volunteers and NGOs, for example Khidmat Malaysia, as well as any NGOs in assisting disaster management operations, especially during the Northeast Monsoon? Please obtain information on the allocation for NADMA's operations nationwide as well as for the state of Pahang, especially the Kuantan District.
Also, I request that all Members of Parliament be involved, regardless of political affiliation, in this disaster situation. Because at this time, the Honourable Opposition Member, the Honourable Deputy Prime Minister or the Service Centre officer, has never been involved in the District Disaster Committee. Thank you.
[Bangun]
Mr Speaker, as I have stated, 159 NGOs have been mobilised. And these NGOs have been coordinated at national, state and district levels. For NGOs that are not uniformed, they are coordinated by the Department of Social Welfare.
And this is based on NADMA Directive No.1 on disaster management policy and mechanism nationally, and we have carried out coordination at all levels, including NGOs mobilised by political parties, regardless of colour, whether dark blue or light blue and other colours too, and God willing, we will do our best. For Kuantan in particular and the state of Pahang in general, we have mobilised all assets. Let us set aside political differences in this matter because floods do not recognise political colours, and flood victims also hope that these differences do not exist, because they are all people who must be helped by the Government, by NADMA in particular, especially at state, district and community levels.
Tampin.
Terima kasih.
Thank you, Madam Speaker. Honourable Deputy Prime Minister, based on the existing guidelines on the eligibility criteria for the Bantuan Wang Ihsan of RM1,000 set by NADMA, applicants must relocate or register at the PPS. Many victims cannot relocate to the PPS. I myself could not leave the house area for two days. So, how am I supposed to relocate to the PPS?
Soalan.
My question is, what is the Government's justification for maintaining such a policy which seems to deny assistance rights to flood victims? Likewise for assistance, it is only eligible for residential houses, while small traders who are greatly affected are not. Is the Government prepared to change its approach from assistance based on registration status to assistance based on verification of damage or the actual impact of the disaster? Thank you, Madam Speaker.
This is a very proactive question. So, after this, you will be promoted. [Laughter] It is true that we have changed the method for distributing assistance to flood victims. Now, the Bantuan Wang Ihsan is given to them before they return home. That means, while they are at the PPS, we give as much as possible at that time. Secondly, for those who did not relocate, but were affected, for example they stayed at the house of children or other family members. As long as they are registered at this Flood Victims Registration Centre, we will also provide assistance. As for the traders— it is a good suggestion and God willing I will bring it to the Central Management Committee on this matter and this is something that must be considered, but we must remember, with permission, this is an act of God. This is destiny from Allah SWT and we are not going to pay compensation, but we want to provide assistance. So, that concern must be given priority.
I invite Datuk Larry Soon @ Larry Sng Wei Shien, Julau.
2. Datuk Larry Soon @ Larry Sng Wei Shien [Julau]: Thank you, Mr Speaker. Julau asks the Minister of Science, Technology and Innovation to state the efforts to decarbonise the country's transport sector, how hydrogen technology can complement the role of EVs and what its strategic advantages are in developing a sustainable low-carbon mobility system?
Please, the Honourable Minister of Science, Technology and Innovation, to reply.
Thank you, Deputy Speaker. Thank you, Julau. Mr Speaker, hydrogen technology has the potential to complement the role of electric vehicles or EVs in efforts to decarbonise the country's transport sector, especially for the heavy transport segment and long-distance travel that require longer operating ranges and shorter refuelling times. In this context, battery-based EVs or BEVs are more suitable for applications such as passenger vehicles, city buses and vehicles with appropriate routes and charging access. Meanwhile, fuel cell electric vehicle (FCEV) technology and hydrogen can be considered for bus and heavy commercial vehicle applications that have more challenging operational requirements. In line with this approach, NanoMalaysia Berhad (NMB) through its EV and hydrogen technology development initiatives has explored the integration of hydrogen systems with electrification platforms, including the development of EV Bus Conversion and fuel cell electric bus
(FCEB) under the EMERGE programme, Enabling Mobility, with permission, Enabling Mobility Electrification for Green Economy, funded by MOSTI through the Strategic Research Fund. This initiative covers the development of three EV buses and two FCEV buses with fuel cell technology used as part of the electrification system to support vehicle operations and increase the flexibility of energy use. Strategically, EVs and hydrogen can be used and developed in a complementary manner to form a low-carbon mobility ecosystem, with EVs suitable for daily travel, while FCEVs have the potential to support heavy, long-distance and intensive operations. The development of local hydrogen technology can also strengthen expertise, supply chains, infrastructure and industrial capabilities, including through converting existing buses to EVs or FCEVs, subject to considerations of cost, safety, operations, lifespan and Government approval. Furthermore, since the cost of green hydrogen is still high, the use of grey hydrogen or high-purity grey hydrogen from conventional processes can be considered as a transitional measure, particularly for applications of proton exchange membrane fuel cells (PEMFC) which produce water as a by-product without emissions at the user level. However, this approach must be supported by comprehensive studies on cost and environmental assessment covering the purification, compression, storage and transportation of hydrogen to refuelling stations before Malaysia gradually shifts to lower-carbon green hydrogen. Thank you.
Julau.
Okay, thank you. Supplementary question. Considering that the cost of producing green hydrogen at present is still quite high, estimated at between USD8 and USD10 per kilogram compared with grey hydrogen which is only around USD2 per kilogram, what are the Government's approaches, strategies and plans to encourage the use of hydrogen as a more sustainable and competitive alternative fuel source?
Thank you, Julau. Thank you, Deputy Mr Speaker. The Ministry of Science, Technology and Innovation (MOSTI) sees hydrogen as a strategic alternative fuel for decarbonising the transport sector, especially for heavy commercial vehicles such as express buses and long-distance logistics. Since the cost of green hydrogen is still high now, the Government may consider using grey hydrogen as a transitional fuel, subject to assessment of supply adequacy, carbon intensity and environmental impact.
As for the use of FCEVs, they do not produce any carbon emissions from the exhaust, producing only water as a by-product. At the same time, hydrogen also has a high gravimetric energy density, namely a high energy content for every kilogram of fuel. So, this characteristic gives an advantage to heavy transport applications that require long travel distances and optimum load capacity. Thus, the use of hydrogen has the potential to offer competitiveness in terms of operating costs compared with diesel, especially when taking into account diesel prices without subsidy. However, feasibility studies must be carried out covering domestic grey hydrogen supply, carbon intensity assessment and environmental impact. Accordingly, the Government may also consider fiscal incentives, infrastructure development and encouragement of FCEV use to stimulate the hydrogen mobility market. In conclusion, hydrogen mobility is not intended to compete with EVs, but rather to complement them, and the role through a dual technology approach, with permission.
As mentioned earlier, BEVs are more suitable for passenger vehicles or short range, with permission, and hydrogen is more for heavy vehicles and also long reach, with permission. Thank you.
Kuala Terengganu.
Yes, thank you, Mr Chairman. Earlier it was said that hydrogen is more suitable for heavy vehicles. However, for hydrogen pilot projects, MOSTI has started a pilot project for a mobile hydrogen refuelling station in Putrajaya with an investment of RM15 million. This involves three Toyota Mirai, this is 2025. If it can be explained further, why do we test on cars first, when the vehicles intended are for heavy vehicles. Then secondly. I would like to ask, what about the progress of R&D on battery recycling technology because these batteries have a lifespan. At the end of this lifespan, critical minerals such as lithium, nickel and cobalt from EV batteries— our R&D on the level of commercialisation of local technology to ensure that spent batteries do not become a burden of environmental pollution, but can instead be utilised as a source of the country's circular economy. Thank you.
Thank you, Deputy Madam Speaker. Thank you, Kuala Terengganu, for those two questions. The first, about the MHRS— mobile hydrogen refuelling station that we developed earlier for a two-year period. Why did we do this?
Because in the HTER- Hydrogen Economy and Technology Roadmap, from now until 2030 is the demonstration stage, or demonstration stage. Where we need to showcase what technology relating to hydrogen and the existing hydrogen energy is. So, we bring in the Toyota Mirai cars to show that the technology is already available and the mobile hydrogen refuelling station can also be implemented. Just to showcase to everyone, to show everyone that the technology is already available. What we need to do is, first, we need economies of scale, which will reduce operating costs. And if costs are lowered, it will become more relevant for the use of hydrogen cars or vehicles at present. So, we bring it in just to prove it, it does not mean hydrogen is more suitable for passenger vehicles. Because at present, the cost of green hydrogen is still high. For the second question, it is about batteries. Actually, this fuel cell battery, its use or content of lithium, nickel or cobalt is much lower than current EV batteries. So, that is a transition process, where from EV batteries we switch to hydrogen, fuel cell EVs, which will use much less lithium or nickel than existing batteries. So, this is also an effort to decarbonise our country's transport system. Thank you.
I invite Tuan Haji Mohd Misbahul Munir bin Masduki, Parit Buntar.
Assalamualaikum, peace be upon you. The Honourable Member's pantun.... If Kota Raja goes for a picnic, Don't forget to bring rubbish bags; Those who won in Melaka, praise be to God, Those who did not win, just accept it.
3. Tuan Haji Mohd Misbahul Munir bin Masduki [Parit Buntar] asks the Minister of Agriculture and Food Security to state the Government's firm position on Malaysia's transition from the International Union for the Protection of New Varieties of Plants (UPOV) 1978 to UPOV 1991 under the Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP).
Please, the Honourable Minister of Agriculture and Food Security, to reply.
...
Parit Buntar has no mines; Having won, don't be arrogant...
[Dewan ketawa]
[Applause] Madam Speaker, the Plant Varieties Protection Act 2004 is intended to provide protection for the rights of breeders of new varieties that they develop. Breeders' participation in obtaining this protection is voluntary. The Government is currently pursuing Malaysia's accession to the International Convention for the Protection of New Varieties of Plants (UPOV 1991). Before this, we have not yet joined. This is the UPOV that we are about to join. The earlier question said that we had already joined, but in fact we have not. As part of efforts to strengthen the national plant variety protection system and to increase confidence in Malaysia's plant variety breeding, propagation and cultivation ecosystem at the international level. Malaysia's accession to UPOV is part of the country's commitment under the Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP), which was ratified on 30 September 2022. For this purpose, the Government has carried out a review and proposed amendments to the Plant Varieties Protection Act 2004 to ensure that its provisions are consistent with current needs, industry developments and related international commitments. This process is being carried out through detailed scrutiny by the Attorney General's Chambers and related agencies to ensure that every proposed amendment is consistent with the national legal framework, Government policy and national interests. In drafting the proposed amendments to Act 634, the ministry has taken into account the views and interests of farmers through a comprehensive engagement process. Since 2016, the ministry, through the Department of Agriculture, has taken the initiative to carry out a series of engagement sessions involving government agencies, non-governmental organisations (NGOs), academics and industry players. This effort aims to standardise the provisions under Act 634, particularly to balance the rights and interests between breeders, farmers and all stakeholders, and through a regulatory impact assessment (RIA) process. Just a little more, yes, this is important, this matter. To date, a total of 29 engagement sessions involving four phases and various parties have been held, including in Sabah and Sarawak, to explain the proposed amendments to Act 634, before Act 634 is tabled and debated in Parliament. Engagement sessions will continue to be held to ensure that all stakeholders are given transparent explanations and can understand the purpose of these amendments to Act 634. The ministry is committed to ensuring that the amendments do not erode any rights of farmers and continue to preserve their traditional practices. The ministry will also
ensure that these amendments do not override the application of any act under the purview of other ministries. The Government's goal is not merely to join UPOV 1991, but to develop Malaysia into a country with a plant variety protection system that is trusted, credible and a reference point at the regional level, particularly in the context of tropical varieties, for the benefit of the entire agricultural value chain of the country, including breeders and seed producers. That is my answer so far. Thank you.
Parit Buntar.
Thank you, Kota Raja. My question is that I ask the Government to state its firm position. I did not say at all that the question had already been joined. That must be understood by the Minister. I ask for the position, thank you for the explanation. An explanation which I think is quite reassuring to farmers, paddy planters, smallholders and so on.
My question is, what is the Government's independent assessment of the risk of increased dependence on commercial seed companies? Rising agricultural input costs and the erosion of national seed sovereignty before any decision is made. And secondly, the Minister earlier mentioned that engagement involving various parties has been carried out. So I want to ask, is that study comprehensive, involving both positive and negative impacts? If a study has been done involving certain agencies with a stake, such as paddy farmers themselves, LPPK, PPK, IADA, MADA and so on, will it be tabled in Parliament? I want to know when the results of the study involving many parties will be tabled in Parliament. Finally, Parit Buntar wins without arrogance, insya-Allah. Grateful, alhamdulillah.
Today it is your turn, tomorrow will be ours. [Reads a verse from the Quran]. Mr Speaker, we are not going to bring it to Parliament and simply bulldoze our way into joining this UPOV. That is precisely why we have held 29 engagement sessions, to keep discussing, even though the deadline for joining is only 10 days away. Then perhaps we may not be able to join this time, namely the final deadline of 29 November 2026, because we are continuing our engagement. We see that there are countries that have not joined, such as India. Its country, with its technology and the greatness of the nation, there are countries that have joined, namely Vietnam, where we see its agriculture is so advanced and developing now. We take all these views into account, including that there are NGOs that have held several gatherings in front of Parliament
we take note of everything and discuss this matter so that any accession by us does not harm especially traditional farmers. There are pros and cons arguments saying that if we join, it will encourage domestic and foreign investors to get involved in this seed industry. That is assessed as positive. On the negative side, some NGOs say there may be a monopoly coming from foreign giant companies. We take all this into account. That is why, even if there is no time within the 10 days, we will continue discussing before we bring it to Parliament, and if it gets a majority vote it can be passed, but we want the views of NGOs to be taken into account too. What is it that causes them to disagree, with the arguments given? So engagement has already been held many times and we will continue again. What is most important is that we want this Act to reassure all parties. If it is brought to this Parliament, and I am confident it will be brought so that we join this international body which has now been joined by 99 countries. Thank you.
Rasah.
Thank you to the Speaker. Thank you to the Honourable Minister. I am among those involved in the engagement sessions. Of the 29 engagement sessions, I am the Chairman of the Special Select Committee. We have discussed two or three times already. We have also met with NGOs such as Sahabat Alam Malaysia (SAM) and the Malaysia Food Sovereignty Forum (FKMM). There are indeed different views. I was very pleased when the Honourable Minister earlier stated clearly that whatever variety system we have must be protected. I think that is the core matter and I am confident, with the commitment of the Honourable Minister who has given sufficiently broad space to all parties to give their views, including within the Special Select Committee, that there are different views. The Special Select Committee has just concluded a working visit to Vietnam. Previously...
Soalan.
...Yes, it takes a little time because it is a big matter. We engaged with Can Tho University and they stated that when joining UPOV, it brings benefits to them, but that is in Vietnam. We cannot take that directly given the situation in our country. So I want to ask, what is the Government's guarantee that if one day the Government decides to join UPOV with amendments to Act 634, it will guarantee that local varieties of paddy planters and farmers remain protected, and moreover get the opportunity to be developed to a higher level without being monopolised by corporate entities that have great
financial power. I seek confirmation or assurance from the Honourable Minister. Thank you, Speaker.
That is precisely why we are not bulldozing. We keep discussing, and we know Vietnam is a left-leaning country. They joined and we see their agricultural progress is remarkable, with thousands of new varieties already released. And Vietnam is among the countries whose agriculture has developed greatly, especially after joining UPOV. There are countries that have not joined, such as India. There are their arguments about education and all that. Whatever it is, we discuss in terms of protection and so on. That is precisely why this UPOV is a matter in which three ministries are discussing seriously, namely MITI, the Attorney General's Chambers and KPKM. So what are the views of the NGOs? There are two NGOs that have given rather harsh views. We respect their views because they are none other than wanting, above all, to protect operators or growers of rice or vegetables who are small rather than big. So we will continue this engagement, and we believe that joining UPOV is important, but with the interests of our farmers protected. That is what we hope this matter can be brought to the upcoming session. Thank you.
Honourable Member, the session for Ministers' Question Time is now concluded. [End of Ministers' Question Time session]
Oral QuestionsQuestions
I invite Dato' Sri Amiruddin bin Shari, Gombak.
Thank you, Deputy Speaker. First question, specifically for the Ministry of MITI. Thank you.
1. Dato' Seri Amirudin bin Shari [Gombak] asks the Minister of Investment, Trade and Industry (MITI) to state the Federal Government's efforts to increase economic productivity and workers' productivity throughout Malaysia. What cross-ministry efforts have been taken so that Malaysia's economic system becomes more productive.
I invite the Honourable Deputy Minister of MITI to answer.
Thank you, Mr Speaker. Thank you, my friend from Gombak. The Government is committed to increasing economic and workers' productivity through a whole-of-government approach by strengthening cooperation between ministries, government agencies, states and also the private sector. This effort focuses on improving business efficiency, reducing regulatory burdens, developing workers' skills and using technology to create a more productive and competitive economy. For the second quarter of 2026, Malaysia's labour productivity based on value added per hour worked increased by 5.5 per cent to RM46.50 per hour compared with the same period last year. The Government will continue to ensure that this productivity growth translates into increased workers' income and public well-being in line with RMK13. Among the Government's main efforts is the implementation of Red Tape Reform (RKB) to reduce compliance costs, shorten approval periods and improve the efficiency of public service delivery. As of 30 October 2026, a total of 1,703 RKB projects have been registered, with 654 projects completed and compliance cost savings amounting to RM3.71 billion. In Selangor, for the Menteri Besar also, the implementation of RKB has produced significant improvements through a project at Selayang Municipal Council, which targets reducing the approval period for the development plan (SPID) from 100 days to 14 days. Meanwhile, the EDA@Sepang project has recorded the fastest approval within a period of nine days and accelerated the period before the start of development works from 222 days to about 23 days only. Both of these initiatives help accelerate the implementation of investment, reduce business operation costs and increase local economic productivity.
I congratulate and commend Selangor, and I hope other states can emulate the excellence of the state of Selangor. To increase productivity at firm and worker level, the MITI ministry, through the Malaysia Productivity Corporation (MPC), implements the Productivity Enhancement, Workforce Empowerment and Industry Transformation (PPTI) programme. There are two programmes. One is non-formal education and one is the in-industry academy. Both of these programmes have succeeded in producing more skilled workers, increasing productivity and the potential to earn higher income. And at the same time,
reducing dependence on foreign workers. So, in line with that, we Malaysia have succeeded as a nation at the top...
Ringkaskan jawapan.
We have succeeded in improving our position in the IMD World Competitiveness Ranking from 2026 to 15th place in the world, and the bureaucracy indicator has also improved from 14th place previously to 6th place now. This is our achievement. That is all, thank you.
Gombak.
Thank you, Deputy Speaker. This question, or my question, is based on a World Bank Report entitled, "Raising the Ceiling and Raising the Floor", with permission, which makes a comparison of workers' productivity rates against the economy. There are several important findings that should serve as an alert to us. First, the export capacity productivity of Malaysian firms has shown no increase from 2010 to 2025 except in the E&E sector. Second, collaboration between companies and the economy is very low, at only about three per cent, and third, skills mismatch among workers increased from 30.2 in 2015 to 36.1 in 2024. Thank you, Honourable Member, for giving appreciation or recognition to the SPEED Selangor Programme. However, these three findings are matters that must be given attention, and they seem not to match the New Industrial Master Plan (NIMP) 2030 and NETR which have been presented by the Federal Government. Therefore, will the Government make a midterm review report of the NIMP, particularly in the area of workers' productivity in all relevant sectors, given that in just three years we will be entering the year 2030? Thank you.
Thank you, Honourable Member Gombak, for giving a sound suggestion. We acknowledge that there are indeed other issues, yes, among which dependence on foreign workers that is excessively causing Malaysia's productivity not to be on par with states— other countries such as Korea and also Singapore and so on. So, those are weaknesses that we need to resolve. So, we need to have a national consensus, because if we do not have buy-in from the countries— from industry and so on, we cannot move forward. As for the midterm review for NIMP 2030, we will— it is still early now because it is only 2026. So, we have a few more years to carry out the midterm review to address the issues raised by Gombak. Thank you.
Kubang Pasu.
Thank you, Honourable Madam Speaker. The nation's economic productivity is closely linked to workers' productivity. If workers' productivity increases in various sectors, especially in the manufacturing and services sectors, then economic productivity also rises significantly, because the manufacturing and services sectors combined contribute more than 80 per cent of the national economy. The implementation of automation and robotics systems will increase workers' productivity and at the same time the nation's economic productivity. In 2025, for example...
Soalan, soalan.
Yes, yes. Just a moment, only briefly. In a moment, be patient, Madam Chairman. In 2025 — these are figures from DOSM, workers' productivity rose four per cent compared with 2024, with a value of RM104,456 per worker productivity. Malaysia's productivity is at a higher level compared with other countries such as Indonesia, Vietnam and Thailand. However, Malaysia still lags behind Korea, Japan and Taiwan. Although economic productivity has increased, there is nevertheless a significant gap between economic achievement and the returns received by workers. For example, according to the PNB Research Study…
Honourable Member, get straight to the question.
...Actual wages among degree holders only rose five per cent between 2012 and 2022. This is the question, Madam Speaker— sorry, thank you. What are the Government's cross-ministry measures and efforts to enhance workers' productivity throughout Malaysia, particularly through the implementation of automation, robotics and technology in the manufacturing industry, including the rubber and palm oil industries? And so far, what percentage of the manufacturing industry applies automation and robotics? Thank you, Madam Speaker.
Thank you, my friend from Kubang Pasu, who raised the issue of automation in our country. Now the Government is targeting 3,000 smart factories so that we increase automation, and various incentives and grants have been given to industry to increase automation. However, the take-up rate is still low. This is because of our dependence on foreign workers, which is excessively reliant on foreign workers. So, it is important that all levels of society know that dependence on foreign workers must lead us more towards automation and
also robotics, because that is the solution, since we already have a policy to reduce dependence on foreign workers. So, what is important is that industry must adopt automation and also robotics as soon as possible. Thank you.
I invite Tuan Syed Saddiq bin Syed Abdul Rahman, Muar.
Thank you, Madam Chairman. My question number 2.
2. Tuan Syed Saddiq bin Syed Abdul Rahman [Muar] asks the Minister of Home Affairs to state the breakdown of foreign immigrants recorded and unrecorded, along with their breakdown: (a) integrated action taken to address the exploitation of workers; and (b) unauthorised employment documents and the crime rate among foreigners.
Thank you, Mr Speaker, Honourable Member for Muar. For the Honourable Member's information, illegal immigrants (PATI) refers to any foreign national who is in Malaysia without a valid pass or permit; who remains in this country after the expiry of the pass or permit granted; or who breaches the conditions of the pass or permit issued to him. These offences involve section 6(1)(c) and section 15(1)(c) of the Immigration Act 1959/63 [Act 155] as well as Rule 39B, Immigration Regulations 1963. Based on the records of the Immigration Department of Malaysia for the period 1 January 2026 to 15 September this year, a total of 35,109 foreign nationals were arrested through enforcement operations by the Immigration Department of Malaysia. In addition, Honourable Member, a total of 22,495 persons were received through handovers at entry points and from agencies such as the police— bringing the overall total of arrests and handovers for the period to 57,604 persons. Of this total, Indonesian nationals recorded the highest number, at 16,744 persons, followed by Bangladesh with 13,543 persons and Myanmar with 8,452 persons. For the same period, a total of 41,277 foreign nationals were repatriated to their respective countries of origin after going through the prescribed documentation process. In addition to enforcement actions, the government also implemented the Migrant Repatriation Programme 2.0, introduced in May 2025, to give illegal immigrants the opportunity to come forward voluntarily and return to their countries of origin. Up to 15 September
2026, a total of 304,905 persons had registered under the programme, while 243,463 persons had returned to their countries of origin. Of the total registrations, Indonesian nationals recorded the highest number, at 131,695 persons, followed by Bangladesh with 57,066 persons and Myanmar with 42,556 persons. The government is taking an integrated, cross-agency approach to address exploitation, abuse and violations of foreign workers' rights. This action does not only involve immigration, but also covers— this action— the government is taking an integrated, cross-agency approach to address exploitation, abuse and violations of foreign workers' rights.
This action, Honourable Member, involves the immigration aspect but also covers compliance with labour laws, payment of wages, welfare, provision of accommodation and so on. Mr Speaker, there were two questions, which I have answered, Honourable Member.
Ringkaskan.
As of 30 September 2026, the Labour Department of Peninsular Malaysia (JTK SM) has carried out a total of 642 integrated operations together with other enforcement agencies such as the Immigration Department of Malaysia (JIM), the Employees Provident Fund (KWSP), the Social Security Organisation (PERKESO), the Royal Malaysia Police (PDRM) and the local authorities (PBT). These operations aim to ensure employers comply with labour laws and the disbursement of rights and benefits to workers as provided for under the law. In addition to integrated operations, JTK SM also carried out 17,488 statutory inspections to ensure compliance with the laws being enforced, including the Employment Act 1955, the Workers' Minimum Standards of Housing and Amenities Act, and the National Salary Consultant Employers Act 2011. Honourable Member, at the same time, JIM continues to take action against employers and foreign workers who breach immigration compliance, including investigating workers without valid passes, misuse of passes, and investigating workers outside the approved sector or employers. For invalid worker documents, among the offences detected are working without a valid pass, overstaying, misuse of work passes, and working in a sector with an unapproved employer. Enforcement action is taken against workers and employers under the Immigration Act 1959/63 [Act 155] and related laws. With regard to the crime rate of foreign nationals. Based on PDRM data provided for the period 2024 to October 2026, a total of 10,517 arrests of foreign nationals have been
recorded by category of offence. The breakdown by year is 33,136 arrests in 2024, 36,740 in 2025 and 30,641 in 2026. The 2026 figure should be viewed based on the data recorded and should not be compared directly with 2024 and 2025. So, the categories of offence include offences relating to immigration, offences relating to entertainment, gambling, theft, prostitution and ATIPSOM. Overall, Honourable Member, this data shows that arrests of foreign nationals cover a variety of offence categories, including immigration offences, gambling, theft, prostitution, trafficking in persons, and other criminal offences. However, Honourable Member, this total number of arrests cannot be directly interpreted as the crime rate of foreign nationals, because a crime rate requires comparison with the total foreign population for the period and the current population. In addition, a person who is arrested has not necessarily been convicted by a court. The government's position is that any individual who commits an offence will be subject to action under the applicable law, regardless of citizenship. We are very serious and always take firm action on this matter. Thank you, Honourable Member.
Muar.
Thank you, Honourable Deputy Minister. Going by the figures from the police themselves, which were debated in the Dewan Negara, there are 1,100 refugees and asylum seekers who are linked to and involved in crimes in Malaysia. Of those 1,100, 1,072 specifically involve the Rohingya community. This is a very high percentage. That means 97.45 per cent. This is what the police have succeeded in taking action against. But the reality is that many more have not been successfully acted against because of complications, lack of documentation, and the absence of a biometric registration system, which now make investigation and prosecution far more complicated and difficult...
Soalan.
Sikit.
Soalan.
15 seconds. That is why there is a statement issued by ACP Ridzuan, Chief of Staff of the Special Branch in charge of the Extremism Division, who acknowledged that because there is no biometric documentation, it is difficult to take action.
My question is, is it true that it is harder for the police to investigate and for the courts to secure a conviction or sentence because there is no biometric system, and the documentation ultimately causes those who practise this crime to end up escaping because it is more complicated to take action. Thank you.
Mr Speaker, whatever measures the ministry has taken, we act based on existing actions and laws. The challenge mentioned by the Honourable Member just now does exist. That is why one of the measures we have taken is through the DPP, the Refugee Registration Document (Dokumen Pendaftaran Pelarian). This is among the measures we have taken, in addition to many other measures in our efforts to address the issue raised by the Honourable Member just now. Thank you.
Tenggara.
Thank you, Mr Speaker. The question from Muar is indeed very important. So, the question from Tenggara— the flood of unauthorised work documents such as counterfeit PLKS stickers would not happen without betrayal. This is the reason for the flood just mentioned, and it is uncontrolled or leaked from the government agencies' own systems. What is the current status of the internal cleansing operation by the Ministry of Home Affairs (KDN) together with the Malaysian Anti-Corruption Commission (SPRM) against officers who collude with syndicates, and how far has the ePLKS Digitalisation System, the application system for the Temporary Work Visit Pass extension in 2026, succeeded in completely closing this gap? Thank you.
Thank you, Honourable Member for Tenggara. Dato' Yang di-Pertua, first, it must be emphasised that KDN does not compromise one inch on matters relating to integrity, enforcement officers or any officers concerned. That means disciplinary action and SPRM. So, on the matter of disciplinary action and the reason for it, KDN, through strategic cooperation with the Honourable Member, together with the Malaysian Anti-Corruption Commission (SPRM). We have launched several series of programmes, for example the special operations series, Operasi Selat, and earlier operations. Throughout 2025, according to the data I have, and in mid-2026, Honourable Member for Tenggara, a total of 36 officers and staff of JIM have been detained, suspended from duty, and are facing charges in court as a result of their involvement with the syndicate producing medical passes and counterfeit PLKS passes.
So, regarding the effectiveness of the digital system raised by the Honourable Member just now— the full implementation of ePLKS without physical stickers, which is integrated with the biometric system. Starting from the end of 2024, it has actually produced results. So, referring to forensics, the forgery of physical stickers at illegal printing shops has been crippled by almost 90 per cent in 2026, because detection is now done digitally at the Smart Device Field for enforcement through scanning a centralised QR code that cannot be cloned. These are among the measures we have taken, including those raised by Muar just now. Thank you.
I invite Tuan Oscar Ling Chai Yew, Sibu.
Thank you, Deputy Speaker. My question is number 3.
3. Tuan Oscar Ling Chai Yew [Sibu] asks the Minister of Health to state the current status of the proposal to build a new hospital building for Sibu Hospital, its implementation plan, as well as the construction period and the need for this building in addressing congestion and increasing the capacity of health services
The Honourable Deputy Minister of Health is invited to answer.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Madam Speaker. Thank you, Honourable Member for Sibu, for the question regarding the current status of the proposal to build a new hospital building for Sibu Hospital, Sarawak. Sibu Hospital is the lead hospital for the Central Sarawak cluster and is a major specialist hospital with a total of 29 specialist and sub-specialist services. The Ministry of Economy has decided that the application for this new additional block project be brought up again for consideration in the RP3 RMK13 as preliminary works. This will give an opportunity for soil investigation works to obtain the type of design suitable for the selected site, because there is also a soft soil problem within the hospital area. The implementation of the preliminary works will determine the project cost more accurately when applying for the implementation of the whole project later. This additional block will increase capacity and expand specialist and sub-specialist services equivalent to a state specialist hospital, with a scope covering a clinical block with an addition of 288 beds, a class block, a 46-unit quarters block, support blocks including car parks, procurement of equipment and ICT components, and addition of new positions.
This additional block will also overcome the congestion problem in the wards and the Emergency and Trauma Department, upgrade specialist clinics and improve women's and children's service facilities with critical treatment facilities, surgical theatres and maternity theatres. The decanting needs and reorganisation of related services must be carried out so that health services run smoothly and well. To meet the car park requirement, the MOH invites private company collaboration through public private partnership to resolve this need nationwide, including at Sibu Hospital, with an open request for proposal method that is now in the advertising phase.
From 2023 to 2025, Sibu Hospital received allocations under repair, upgrading and procurement of equipment works totalling RM27.6 million. Among the works carried out were installing an isolated power system for the surgical theatre, upgrading the building for MRI services, establishing an invasive cardiac laboratory and equipment, upgrading the electrical wiring system and works to overcome condensation and mould problems. The MOH will monitor and improve health services that are quality and the best for the people. We always welcome proposals and views from the Honourable Members so that we can meet the needs of the people in their respective Parliamentary constituencies. That is all. Thank you, Madam Speaker and Honourable Member for Sibu.
Sibu.
Thank you, Deputy Minister and also Deputy Speaker. My supplementary question: the development of new hospitals and tertiary medical facilities in Sarawak appears to be more concentrated in Kuching compared with other areas such as Sibu and Miri. Can the ministry state the total amount of hospital development allocations that have been channelled to Kuching, Sibu and Miri in the last five years? And how does the ministry ensure that the development of Sibu Hospital is given due priority based on its population and the very wide service coverage area it now has?
Thank you, Honourable Member for Sibu. Do not forget that we need to focus on the largest population first, then the smallest. Kuching is the largest in Sarawak, so that is the reason we give a greater allocation to the population in Sarawak. However, the MOH is working to upgrade and improve rural facilities so that prompt treatment can be provided to
people in the interior areas and also reduce the burden of dependence on lead hospitals. For the RMKe-12 allocation, 2021 to 2025, Sibu received RM1.87 million, Kuching received RM111.5 million, while Miri received RM577.9 million. This is in terms of need, in terms of each town, in terms of improving the services required. That is all. Thank you, Madam Speaker and Honourable Member for Sibu.
Kuala Langat.
Thank you, Mr Speaker. My observation is that Sibu Hospital is among the hospitals that receive good support from NGOs and also the private sector, including the Yayasan Jantung Sarawak. My finding is that Sibu obtained an MRI from Yayasan Jantung Sarawak in February 2026 with an allocation of RM2.5 billion from the Foundation and RM1 billion from the government, from the MOH. And, in April, Sibu was one of the very first hospitals that had— that received the first helium-free MRI donation in Malaysia from
Soalan.
...Foundation donation of RM9,000, RM9 million. And recently in October, it received an ambulance with high technology from a corporate body.
Soalan.
My question is, will this become a benchmark for the Malaysian health services, which I believe has a very good service or donation of ambulances and MRI in terms of increasing the capacity of health services in our country. Will this become a benchmark for procurement and the equipment to be used by the MOH in our country? Thank you.
Madam Speaker, Honourable Member, our aspiration is to give the best rights in terms of health to all the people of Malaysia. We look far ahead and must balance in terms of the cost of goods, the cost of development and also the cost of operations. Therefore, we try to give the best that we can afford. On the private side, we are grateful that the private sector, from NGOs, graciously gives— we welcome their assistance in raising the health standards that are greatly needed in Malaysia, and if we can improve across Malaysia it is very much welcomed. Thank you, Madam Speaker and Honourable Member.
I invite Tuan Mohd Azizi bin Abu Naim, Gua Musang.
Thank you, Deputy Speaker. My question is number 4.
4. Tuan Mohd Azizi bin Abu Naim [Gua Musang] asks the Minister of Rural and Regional Development to state what integration measures the Ministry will take to ensure that the construction of the village connecting roads to the Orang Asli outposts in Gua Musang can be completed on schedule, and to ensure that the Orang Asli in those outposts receive benefits commensurate with the financial allocation provided by the Government.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, the Ministry of Rural and Regional Development (KKDW), through the Department of Orang Asli Development (JAKOA), is always committed to ensuring that basic infrastructure development projects, particularly village connecting roads in Orang Asli interior areas, are implemented in an orderly manner and according to the schedule set, for the welfare and also the safety of the local community. The project to build and complete village connecting roads in Kuala Betis, Pos Bihai, Pos Belatim, Pos Balar, Pos Hau, Kuala Betis, Gua Musang, Kelantan, which involves a total cost of RM190 million over 94 kilometres, is a main component under the Gua Musang Integrated Development Programme. The physical works on site include maintenance of existing roads and construction of temporary bridges to ensure access and routes for local residents are not cut off. As of October 2026, the physical progress of works on site has reached 26.75 per cent. To ensure that the implementation of this project runs according to schedule and provides optimum benefits to residents, the ministry and JAKOA have taken several effective integration and control measures as follows. First, strengthening strategic cooperation with the implementing agency and also the state government. Optimising the expertise of the Public Works Department (JKR) as the implementing agency, while strengthening close cooperation with the Kelantan State Government and the local authority to expedite the gazetting approval processes, land handover, and permission for passage through permanent forest reserves. Second, periodic monitoring and issue resolution, carrying out scheduled monitoring sessions and periodic coordination between KKDW, JAKOA, JKR and the state authorities to identify and address any technical issues, site approval, or environmental conditions immediately.
And third, the construction of this 94-kilometre standard R1 tarred road will connect interior outposts such as Pos Bihai, Pos Belatim, Pos Balar and Pos Hau to the town centre of Kuala Betis. This facility will not only shorten travel time and improve the level of safety of land transport, but also enable basic services including health, education and welfare assistance to be delivered more effectively and stimulate the economic growth of the Orang Asli community. Thank you, Mr Speaker.
Gua Musang.
Thank you, Deputy Minister. Yes, that was a rather interesting answer to hear, but the people out there, especially the Orang Asli in the interior areas, consider the roads and the RM190 million value a very large sum that they have long been waiting for, when it involves an integrated project. However, yes, it has already been one year, and I hope the ministry will be very careful, first and foremost in terms of the appointment of contractors. How is it that the contractor has not moved for a year, and when the community asks— the Orang Asli community telephones me, they go straight to the Prime Minister's Office, and the PMO has called me, right? How could it happen that— an answer? We understand.
Soalan.
...And the Deputy Speaker, I did not intend to question the appointment of contractors, but the staff at the site answered the local community's questions in a way that should be a little more academic. Do not answer that the contractors are scrambling for commissions. So, for a year no work could be done. The machinery is not on the ground.
So, taking into account the decision of the Right Honourable Prime Minister to disclose to the public all information on government contract procurement, such as the names of companies awarded contracts, project values and current progress. So, this mechanism is actually good to ensure that public trust in the ministry's project management is continuously maintained. So, my supplementary question is, what concrete steps have been and will be taken by the ministry to strengthen integrity and transparency in procurement, especially in selecting contractors or monitoring performance, including action against contractors who have political connections but fail to carry out contracts within the period stipulated in the work specifications. And is the Minister prepared to disclose the number of contractors appointed through open tender or direct negotiation for the Orang Asli road projects—
Orang Asli roads. I understand that apart from this road, there are other roads under KKDW that have problems. So, what I mean is...
Yang Berhormat.
Yes. What I mean is, we should disclose to the public the names of the contractors involved in delays. My last question...
Honourable Member, that is enough, Honourable Member. The question is too long.
There are two questions.
This is not the time for debate.
Dua soalan.
Sila duduk.
Okey.
[Bangun]
[Bangun]
[Bangun]
Thank you, the Honourable Member for Gua Musang, for the earlier question. We are indeed very concerned about the commitment or concern of the Honourable Member for Gua Musang regarding the implementation of rural roads or village connectivity roads in Orang Asli settlement areas. For the information of Mr Speaker, the ministry has taken note of the government's intention to strengthen the transparency of procurement information and project performance in order to safeguard public confidence. To strengthen integrity, transparency, procurement and performance monitoring, the ministry and implementing agencies are fully subject to Treasury circulars, the prevailing government procurement procedures and the centralised project monitoring system. Monitoring of physical and financial progress is carried out periodically through site meetings, monthly progress reports, technical reviews together with implementing agencies such as the JKR and the JPS, as well as continuous training for officers to ensure compliance with regulations. For the preparation of information disclosure, the ministry will comply with the procedures and directives to be determined by the Ministry of Finance in due course. With regard to action against contractors who are late, fail to complete projects, or cause the termination of contracts, enforcement actions are enforced in accordance with contract clauses and prevailing regulations. This includes the imposition of certain specified liquidated damages, the issuance of show-cause notices, termination of contracts, forfeiture of bonds
for performance and blacklisting through the relevant system— to meet the criteria concerned. Thank you, Mr Speaker.
Batu Pahat.
Thank you, Madam Deputy Speaker. My supplementary question is, does the ministry have any plan to integrate the construction of these village roads with Orang Asli development programmes, including access to Orang Asli agricultural produce, education and health services, so that this project is not merely about providing roads.
Thank you, the Honourable Member for Batu Pahat, for the supplementary question. For the information of all, the implementation of any road, not only in Orang Asli villages but in all rural areas, actually has a strategic plan. Not only for the benefit of KKDW, not only for the connectivity of the village concerned, but actually these roads are very important in improving quality of life and well-being. Roads are not only for connectivity; roads also bring rural communities closer to the facilities provided by the government, especially schools, in terms of health, and also economic development programmes. Because in every plan implemented, these three impacts become the main priority of KKDW in implementing construction programmes not only for rural roads, but also village connectivity roads. Thank you, Mr Speaker.
For question number 5, the Honourable Member for Penampang is absent.
[Question No. 5 – Honourable Datuk Ewon Benedick (Penampang) absent]
For question number 6, the Honourable Member for Labuan is absent.
[Question No. 6 – Honourable Dato' Indera Dr. Suhaili bin Abdul Rahman (Labuan) absent]
I invite Puan Hajah Rodziah binti Ismail, Ampang.
Thank you, Chairman— Mr Speaker. My question is number 7.
7. Puan Hajah Rodziah binti Ismail [Ampang] asks the Minister of Investment, Trade and Industry (MITI) to state whether the government is willing to make the achievement of domestic value-added, such as technology transfer, high-skilled employment, local vendors and exports, a performance condition for EV incentives, rather than merely an investment commitment, following BYD's change of plan from its own factory to assembly through local partners, no longer its own factory.
Mr Speaker, thank you to my friend from Ampang. For the information of the Honourable Member for Ampang, the government's main objective is to ensure that Malaysia does not merely become a market for electric vehicle (EV) users, but also gains long-term benefits through the development of technological capability, strengthening of the supply chain and local vendors. The creation of quality workers as well as increased exports are in line with the National Automotive Policy (NAP) 2020 and the New Industrial Master Plan (NIMP) 2030. We are now in a phase for Malaysia, we are in the adopt phase. That means, we encourage the use of EVs. So, we provide various incentives to consumers, especially in terms of excise duty exemption for CKD, so that more people use EVs. So, from 2022 until 2025, the government has actually faced tax forgone of RM400 million on excise duty and RM3 billion for import duty forgone, a total of RM3 billion from 2022 to 2025. So, to strengthen the existing incentive mechanism, the government requires investors to implement localisation by using local resources. To strengthen this objective, the government is preparing a study to improve the incentive mechanism so that it is in line with the targets of the National Automotive Policy and NIMP 2030. These improvements not only place emphasis on the participation of local vendors, technology transfer and the development of high-skilled manpower, but also make the achievement and promotion of exports one of the main criteria and performance conditions for EV incentives. On the issue of BYD's investment, the change in the company's business plan from building its own assembly factory to carrying out assembly activities through local partners is a strategic business decision of the company concerned. Although BYD is not doing its own assembly, the CKD components imported and assembled by the local partner company must comply with the "knockdown" rate or knockdown rate stipulated under the Customs Rules 1988, to ensure that the assembly activity meets the definition of CKD and is not merely simple assembly work. In this regard, BYD is still required to comply with the stipulated "knockdown" rate. At the same time, cooperation with local partners can
open up room for the implementation of localisation activities for certain components, thereby enabling the transfer of knowledge and technical skills. The sharing of SOPs and the continuous development of vendor and local workers' capabilities. Thank you.
Ampang
Thank you, Minister. I see there is a question, and the answer does give a bit of an idea, but actually if we look at the original plan to meet the demand or request for EVs, we were supposed to have a factory in Tanjong Malim. They said it would provide employment for 5,000 people, including in various technical backgrounds, but when it was moved to Kulim, under Inokom, actually they— I am not sure whether the original investment amount of the RM3.3 billion that we have lost can be recovered by using an existing factory. Previously it was a new factory, now it is an existing factory.
Soalan.
So, we have lost many things. So, my question is, will the BYD Inokom MoU be subject to the same domestic value-added KPIs as the licence in Tanjong Malim? That is the first. Secondly, what percentage of local content, the number of new vendors and the number of local engineers, because we are sharing an existing factory, not a new factory. That is the risk. We also want to know why this was done. And thirdly, how will MITI audit performance? This is even more important. Because we have lost RM3.3 billion, when we move, we want to recover it; what audit will be carried out? Thank you, Deputy Speaker.
Thank you for the question, Ampang. Actually, this issue has already been briefed because it is complex and has pros and cons, and MITI has given a lengthy and comprehensive briefing in the Select Committee on Industry as well as in the last Parliamentary session, and we may refer to what has been informed at that Special Select Committee. Thank you.
Jerlun.
Honourable Minister, Mr Speaker. Upon examining the Minister's answer just now, it shows that the government has outlined that EV manufacturers who begin local assembly will receive excise duty exemptions as well as sales tax exemptions. However, such incentives will only be effective if the conditions are enforced.
Straight to the question.
For example, on 10 September 2026, BYD confirmed that its factory in Tanjong Malim would not proceed because MITI set export conditions for production that were not agreed by BYD. This situation raises questions as to whether the incentive conditions and the consequences if those conditions are not met are sufficiently clear. My question is, will the government include a clawback clause for EV incentives, including excise duty exemptions and sales tax exemptions, should the company fail to achieve the agreed domestic value-added targets and investment commitments? Secondly, what specific plan does the government have to ensure that EV assembly projects involve local component vendors and SMEs in the supply chain and achieve genuine technology transfer, not assembly by a large number of labourers? Thank you.
Thank you, my friend from Jerlun. Basically, yes, in NIMP 2030, we emphasise economic complexity and the achievement of domestic value-added. The government constantly introduces mechanisms that emphasise localisation and also prioritise local vendors and high-skilled workers with better wages. So, this is our way of ensuring that all investments benefit the people more. Regarding the BYD issue, I have explained it; a very lengthy briefing has been carried out for Members of Parliament, especially the Special Select Committee on Industry, which has been carried out, and I hope— because this issue is complex and cannot be explained in— in 30 seconds. So, it is better for Members of Parliament who were not present to read the report issued by the Select Committee on Industry. Thank you.
I invite Dato' Muslimin bin Yahaya, Sungai Besar.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Mr Speaker. My question is number 8.
8. Datuk Muslimin bin Yahaya [Sungai Besar] asks the Minister of Entrepreneur and Cooperative Development (KUSKOP) to state, in detail, in relation to the target of assistance amounting to RM15 billion provided for entrepreneurs nationwide throughout 2026, through which agencies under KUSKOP, the target number of entrepreneurs given priority for such financing, and how many new entrepreneurs have gained access to this capital.
Please, the Honourable Deputy Minister of KUSKOP to respond.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, my friend the Honourable Member for Sungai Besar, for the question raised this morning. Madam Speaker, for the information of the Honourable Members, the Ministry of Entrepreneur and Cooperative Development (KUSKOP) has set a financing commitment of up to RM15 billion for 2026 to strengthen access to capital and enhance the business capacity of Micro, Small and Medium Enterprises (PMKS) and cooperatives nationwide. This financing facility is implemented through agencies under KUSKOP. These include TEKUN Nasional, Amanah Ikhtiar Malaysia (AIM), Bank Rakyat, SME Bank, SME Corp, the Malaysian Cooperative Commission (SKM) and the Contractor Services Centre (PKK). Financing is also provided to micro entrepreneurs, including hawkers and small traders, to start or expand businesses, in addition to supporting high-potential entrepreneurs to expand their markets. Financing also covers first-time and existing entrepreneurs who require additional financing to increase business scale. Based on achievements up to October 2026, KUSKOP has approved financing totalling RM12.15 billion, or 81 per cent of the RM15 billion target for 2026, which has benefited 313,912 entrepreneurs and cooperatives, including at least 52,299 entrepreneurs who obtained financing access for the first time. Of that total— of that total, Bank Rakyat recorded the highest financing at RM4.8 billion, followed by SME Bank at RM3.49 billion, AIM RM2.55 billion, TEKUN Nasional RM1.13 billion, SKM RM93.23 million, SME Corp Malaysia RM79.3 million, PKK RM5.62 million. This achievement reflects KUSKOP's continuous commitment to expanding access to financing for new entrepreneurs, in addition to supporting the growth and expansion of existing businesses. In expanding access to financing for the micro segment, KUSKOP also focuses on small-scale financing that is easily accessible. For the period January to October 2026 alone, RM4.02 billion in micro financing has been disbursed to 310,497 micro entrepreneurs through the relevant financing agencies. This approach is important to ensure that small traders, hawkers and entrepreneurs with constraints obtaining financing continue to have the opportunity to develop their businesses.
Overall, KUSKOP will continue to strengthen the implementation of the ministry's initiatives through expanding financing access, simplifying application processes and monitoring the performance of financing disbursement. Thank you.
Sungai Besar.
Thank you, Madam Speaker. Thank you, Deputy Minister. Actually, Deputy Minister, many of our SME entrepreneurs have great potential to expand their businesses. However, usually there are constraints in terms of capital. So, how does KUSKOP help these entrepreneurs explore new markets through financing facilities for potential SMEs? Is it still applying the method whereby any entrepreneur applying for financing from any agency under KUSKOP, one of the conditions to obtain financing is that they or the entrepreneurs must have attended guidance courses from INSKEN or the National Entrepreneurship Institute, even if it is only a cash management course? Thank you, Madam Speaker.
[Bangun]
Oh, a different kind of question from the former Deputy Minister of KUSKOP, who was excellent. Thank you, the Honourable Member for Sungai Besar, for the supplementary question.
[Bangun]
[Bangun]
Indeed, KUSKOP provides various financing facilities as well as capacity-building support to our SME entrepreneurs, and through SME Bank, for example, the Honourable Member perhaps knows, we have several programmes under SME Bank, an agency under KUSKOP, yes, mainly, if I may mention, the business expansion financing programme. What they provide for this is to provide working capital financing, asset purchases, increase in production capacity, automation and digitalisation of operations to improve the productivity of SME entrepreneurs. So, loans from RM1,000 up to RM140 million will be provided. So, this means the loan will also be supported by MOF, the Ministry of Finance. This means that if someone receives a certain amount of loan, but does not require collateral, no security needed, it will be guaranteed by the Business Financing Guarantee Scheme from MOF. That is why under SME Bank we also have a programme for capacity building. The Centre for Entrepreneur Development under SME Bank also provides training, guidance and business management aspects. And we also want to see our entrepreneurs
grow. As the Honourable Member said earlier, not only be excellent at the local level, but also at the international level. That is why SME Bank has the Business Export Programme (BEP) in collaboration with MATRADE to help our SME entrepreneurs penetrate international markets. They will be given guidance on exporting, and then will be invited to join trade missions at the international level. Then, if they attend any such trade mission, efforts will be made to arrange business matching for them. That is SME Bank. As for Bank Rakyat, Honourable Member, we also have programmes...
Ringkaskan jawapan.
Just a moment, Honourable Member. Bank Rakyat, we also provide the PMKS financing programme for the industrial sector to increase operational capacity. Loans of up to RM5 million without collateral, Honourable Member. Then, scaling-up funds are also provided under Bank Rakyat. The interest is covered. Not all of it is borne by the borrower; it will also be assisted by the government. That is how powerful the programmes we provide are, to help our PMKS entrepreneurs. The government also helps pay their interest rate, not only the borrower or the entrepreneur. So, the Honourable Member's second question was about having to attend an INSKEN course first. For the Honourable Member's information, there is no such requirement. We stress that any entrepreneur who wants to apply for a loan must attend a course under INSKEN first, no, it is not necessary, but we actually encourage every entrepreneur to take courses under INSKEN. If any courses are conducted under INSKEN, we will work with them. [The Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting] Obtain information on how many people have attended the courses. If many entrepreneurs who have not received financing have attended those courses, we will offer it directly to them with the cooperation of INSKEN just now. So, we will continue to help through INSKEN or other agencies. We will carry out cross-agency, integrated cooperation to help our entrepreneurs access financing and also support in terms of modernising capacity. Thank you, Honourable Member.
Thank you, Honourable Minister. Bismillahirrahmanirrahim. [Recites a prayer] The floor is given to the Honourable Igan.
Thank you, Dato' Mr Speaker. Honourable Deputy Minister, I listened carefully to the loans provided by the government. This is a very encouraging matter, but Honourable Deputy Minister, for entrepreneurs especially hawkers and small traders as well as micro-entrepreneurs, the need to obtain business capital urgently is very important to ensure the continuity of their daily operations. In this regard, Honourable Deputy Minister, a simple application process and a short financing approval period, quick, will certainly help ease the burden on entrepreneurs. My question, Honourable Deputy Minister, is what steps have been implemented by the Ministry of Entrepreneur and Cooperative Development (KUSKOP) to expedite the approval process for this financing, especially for informal and micro entrepreneurs and small hawkers who need capital urgently? Thank you, Honourable Deputy Minister.
The Minister may please respond.
Thank you, Honourable Member, for the supplementary question. It is true that KUSKOP has already introduced several engineering initiatives and is implementing all of them. For what purpose? Firstly, to expedite the approval of financing. Secondly, to reduce bureaucratic red tape and simplify documentation requirements. In the past, there were perhaps many complaints from any financing agency, many documents were requested, then approval was delayed, many things, but today, no. We will monitor every agency, Dato' Speaker, so that they truly implement our engineering measures, initiatives to reduce: firstly, existing bureaucracy. For example, at TEKUN Nasional. In the past, they perhaps needed one month, 20 days to process, to approve a loan, to borrow, but today, no. We have set a target that they must shorten that time and they agreed. From 10 days today, previously, but today it is up to five working days only. They receive, process and also disburse the loan within five working days. That is TEKUN Nasional. What documents are requested? Only four documents, very simple: firstly, identity card, a copy of the identity card; secondly, licence from the local authority (PBT)
or SSM; then, the latest three-month bank statement; then, photographs of the premises or business, that is enough. And what is even more impressive, starting from August this year, TEKUN Nasional has encouraged our entrepreneurs to apply for financing online. If financing is done online, Dato' Speaker, and below 20,000, we will process and approve it within 24 hours. This is the charter that has been drawn up by TEKUN Nasional. Amanah Ikhtiar Malaysia, too, has reduced a lot of bureaucracy and shortened the time. In the past it was up to 20 days perhaps, but today they will process, approve and disburse the loan in less than 16 days, at least 10 days. That is seven percent, 70 percent of most of those received in less than 10 days, Dato' Speaker. As for the documents required, only one for AIM. Only a copy of the identity card is needed. Nothing else is necessary because we also help entrepreneurs at the informal village level, who do not even have a licence, we also provide funds. Aunties who sell vegetables by the roadside, sisters who sell kuih wherever they are without a licence, we also help them with financing under Amanah Ikhtiar Malaysia. As for Bank Rakyat, Bank Rakyat, the approval period is six days for micro financing and up to 14 days for PKS financing, which is above micro. So, that means they will get it in less than two weeks. Six days for micro, micro-entrepreneurs, but 14 days for PMKS entrepreneurs. The documents required are also simple and easy. A copy of the identity card, business registration document, bank statement or sales records for the latest six months for PKS and cooperatives, additional documents including business profile and audited financial statements for three years. And SME Bank's time has also been reduced, shortened from 30 days to 14 working days, 30 days to 14 working days for working capital financing from RM100,000 up to RM1 million for PMKS. The documents required are also simple: financing application form, copy of identity card, company registration documents including Form 9, Form 24, Form 49 under the Cooperatives Act if the borrower is a company. And SME Corp also provides financing and the process has also been shortened, Dato' Speaker, from 21 days to seven working days only. All that we do is engineering to make it easier for our entrepreneurs to access financing capital for the continuity of their businesses, whether domestically or even internationally. Thank you, Dato' Speaker.
Thank you, Honourable Minister. We now move to the ninth question. I invite the Honourable Puan Wong Shu Qi, Honourable Member for Kluang, to ask the question.
Thank you, Mr Speaker. My question is number 9.
9. Puan Wong Shu Qi [Kluang] asks the Minister of Home Affairs to state the effect of the amendment to Akta 283 which came into force on 22 August 2025, as follows: (a) the number of inmates convicted of offences of drug abuse or possession for personal use so far and their percentage of the total number of inmates; and (b) the number imprisoned compared with those transferred to treatment, 12 months before and after.
The Minister of Home Affairs may respond.
Thank you, Honourable Member, Dato' Dr., Mr Speaker, Honourable Member for Kluang. For the information of the House, the amendment to the Drug Dependants and Drug and Substance Abusers (Treatment and Rehabilitation) Act 1983 [Akta 283], which came into force on 22 August 2025, is based on the policy of diversion, namely shifting from imprisonment to treatment and rehabilitation for drugs and substances. This amendment does not mean the complete abolition of criminal offences or the removal of drug use offences from the Honourable Member's criminal law framework. From January to September 2026, a total of 12,255 convicted inmates for offences under section 15(1)(a) of the Dangerous Drugs Act 1952 [Akta 234], namely introducing drugs into the body, and a total of 31,827 convicted inmates for offences of possession of small quantities of drugs were recorded. The total of these two groups of convicted inmates is part of the total number of convicted drug-related cases, representing 46.5 per cent of the total number of convicted inmates in prison, namely 94,780 inmates at present. Meanwhile, the total number of convicted drug inmates in prison is 64,356, which is 67.9 per cent of the total number of convicted inmates. The number of inmates involved in drug cases is high. For the period January to December 2025, Honourable Member, a total of 14,220 convicted inmates under section 15(1)(a) of Akta 234 compared with 21,716 persons detained under offences in sections 6 and 6A [Akta 283]. For the period January to September 2026, Honourable Member, a total of 12,255 convicted inmates under section 15(1)(a) [Akta 234] compared with 18,160 persons detained under offences in sections 6 and 6A [Akta
283]. Naturally, the government believes that the drug challenge can only be addressed through a balanced approach among prevention, enforcement, treatment and rehabilitation efforts.
Therefore, Honourable Member, the enforcement of Akta 283 is an important reform in strengthening the approach to addressing the drug issue in this country, Honourable Member. This reform places emphasis on treatment and rehabilitation without compromising the firmness of criminal action against drugs, and at the same time reflects the government's commitment, through the Ministry of Home Affairs and the agencies under it, to build a healthier, safer and more prosperous society for the sake of our nation. Thank you.
Thank you, Honourable Member. Honourable Member for Kluang, please proceed.
Thank you, Mr Speaker. Thank you for the detailed reply from the Deputy Minister of Home Affairs. Therefore, given that the amendment to Akta 283 is actually intended to shift drug addicts from prison to treatment, although there is still responsibility under other Acts, especially those related to crime, nevertheless the numbers provided and all the figures given by the Deputy Minister just now show that the number of inmates still held in prison has not decreased. I would like to refer to two figures, namely 83,944 persons in January. These are the figures provided by the ministry to Parliament in January this year. From this figure to about 90,000 persons in October this year. These are also the figures disclosed in Parliament during this session. So, this shows there is no decrease and in fact there is an increase. And 75 per cent are involved in drug cases, and most of these are under section 15(1) of the Dangerous Drugs Act. So, given that this issue is indeed serious, even with the amendment in Parliament, the problem has not been resolved. So, I would like to ask whether the ministry will consider making improvements, namely making further amendments to section 15(1) so that guidelines are issued to the Public Prosecutor and also the Magistrates so that drug addicts are diverted to treatment from the arrest stage and not only on a voluntary basis, and ultimately solve a large part of the problem of overloaded, with permission, in our prisons. Thank you.
The Minister may respond.
Thank you, Honourable Member for Kluang. Honourable Dato' Mr Speaker, the figures speak for themselves. So,
the government has taken note that the section in question, section 15(1) under the Dangerous Drugs Act 1952, will be reviewed, and is always ready to assess the effectiveness of the law based on data and implementation experience, while ensuring the safety and peace of society is continuously safeguarded. Honourable Member, this section falls under the purview of the Ministry of Health Malaysia. Meanwhile, implementation involves two main agencies under the Ministry of Home Affairs, namely the Royal Malaysia Police (PDRM) for enforcement and the National Anti-Drugs Agency (AADK) for prevention, treatment and rehabilitation. This approach emphasises integrated governance between enforcement and public health. Section 15(1) enables the early detection of drug addicts and referral to rehabilitation programmes, including through Court Orders. Honourable Member, in this regard, Honourable Member, in line with the policy of diversion that has been strengthened through the Drug Dependants and Drug and Substance Abusers (Treatment and Rehabilitation) Act, which was amended in this House in 2025, without compromising firm action against drug trafficking. Accordingly, the government's aim is clear in combating drug abuse and drug and substance trafficking, namely protecting the people and ensuring that rehabilitation opportunities are effective in line with public safety and public order for all Malaysians. This is what I can explain. Thank you.
Thank you, Honourable Member. Before I move on to...
Honourable Member, a supplementary question. May I, Mr Speaker?
Just a moment, Honourable Member. I have not finished speaking. Honourable Tuaran, thank you for a copy of this book. [While showing a copy of the book] This can help me in the appointment of JKKOA Orang Asli in Peninsular Malaysia. Sabah natives are roughly the same as the Orang Asli here. Thank you.
Terima kasih.
And congratulations on the publication of this book. Honourable Member, please proceed.
Thank you, Honourable Mr Speaker. Honourable Deputy Minister, my small supplementary question is that we are focusing on—we are facing the nation's main enemy, this drug. From the small amount of data I obtained, after the amendment to Akta 283 that came into force on 22 August last year, the Ministry of Home Affairs (KDN) reported that 2,335 individuals came forward voluntarily to
receive treatment, yes, until October 2026, which is roughly an average increase from 75 persons to 232 persons. So, the question is, when section 15 of the Dangerous Drugs Act still retains criminal offences for drug use, whereas the Act we amended, Akta 283, prioritises treatment and rehabilitation approaches, my question, Honourable Minister, is how does KDN ensure that both laws are implemented in a consistent manner so that addicts who are eligible to receive rehabilitation are not sentenced to prison under the Dangerous Drugs Act? And secondly, is the government prepared to coordinate the legal framework and mechanisms between PDRM, AADK and the prosecution so that the goal of rehabilitation is truly achieved and not merely increasing the number of admissions to our treatment centres? That is it, Honourable Minister. Thank you.
The Honourable Minister may please respond.
Thank you, Honourable Member. I have already explained in terms of figures and the related laws. The Honourable Member also just mentioned matters related to voluntary action. Let me address voluntary action first. For the Honourable Member's information, we are constantly strengthening access and openness of channels for this treatment and rehabilitation in line with the enforcement of the amendment to the Drug Dependants and Drug and Substance Abusers (Treatment and Rehabilitation) Act [Akta 253]. This is an approach based on diversion from punitive punishment to treatment based on public health, and encouraging individuals to seek help voluntarily. These are among the spirit of the act in question. And in the same circumstances, the act that― this means Akta 283 does not mean that we do not take any action against any individual who violates regulations, for example under the Dangerous Drugs Act. So, the ministry, whether under the Royal Malaysia Police or AADK, takes action based on the acts, and we constantly coordinate actions and operations, actions and so on. And based on the act just now, we are able to address the issue even though cases are increasing and so on. Thank you.
Thank you, Honourable Minister. We move to question 10. I invite the Honourable Tuan Wan Ahmad Fayhsal bin Wan Ahmad Kamal, Honourable Member for Machang, to ask the question.
My question is number 10.
10. Tuan Wan Ahmad Fayhsal bin Wan Ahmad Kamal [Machang] asks the Minister of Natural Resources and Environmental Sustainability to state when the comprehensive policy on the development of the national rare earth industry will be finalised and tabled in Parliament, including the stance on the export of raw materials, technology transfer conditions, domestic downstream processing, environmental protection, and the sharing of revenue with states and local communities.
The Minister of Natural Resources and Environmental Sustainability is invited to respond.
Thank you, Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh...
Waalaikumussalam.
...Salam Malaysia MADANI. Thank you to the Honourable Member for Machang for the question. Mr Speaker, the government is committed to developing the country's rare earth element (REE) industry comprehensively, responsibly and sustainably. This is guided by the framework of the Third National Mineral Policy, which was agreed by the Cabinet on 17 January 2024. This policy places emphasis on developing the entire value chain of the national mineral industry, covering mining activities at the upstream stage, processing and separation of elements at the midstream stage, and the production of high value-added products at the downstream stage.
So, this means this policy does not need to be tabled in Parliament, Honourable Member for Machang. However, it can certainly be brought to the Special Select Committee for consideration or briefing. In this regard, the government is implementing various strategic initiatives in an integrated manner with the involvement of relevant ministries, agencies, state governments and industry players to strengthen the REE industry development ecosystem in the country. That is why we have the Special Task Force on the REE Industry Development Roadmap involving the Ministry of Natural Resources and Environmental Sustainability (NRES), MITI, MOF, MOSTI, KE and other technical agencies, in addition to the National Mineral Council Meeting platform. With regard to export policy, the government maintains the moratorium on the export of raw REE materials, which has been in effect since 1 January 2024, as a measure
strategic in order to encourage the development of the domestic downstream processing industry and to avoid dependence on exporting raw mineral resources. However, in line with the Cabinet's decision on 15 July 2026, the government has provided a limited and conditional mechanism for considering REE exports for research and development and processing purposes. Accordingly, the Ministry of Natural Resources and Environmental Sustainability (NRES) issued the Guidelines for Considering Applications for Export of Raw REE on 1 October 2026 so that we can ensure any export considered supports the development of technology, the mastery of expertise and the establishment of domestic REE processing facilities. Through this approach, we can ensure that every application to export raw REE is assessed transparently, systematically and against clear criteria, in line with government policy. From the industrial development aspect, Mr Speaker, the government gives priority to efforts to attract strategic investment involving partnerships and technology transfer, the development of local expertise and the strengthening of domestic industrial capacity. The focus is on developing the midstream industry, including the processing, separation and production of REE metals and alloys, as well as the downstream industry such as the manufacture of permanent magnets, which are of strategic importance in the high-technology industry and the energy transition. So, the meaning is that Malaysia will not merely become a producer of raw materials, but will be able to develop its own processing capacity, master the relevant technology and obtain higher added value from the country's REE resources. Therefore, if we look at the economic benefits, it can generate royalty revenue for the state governments, as the parties with jurisdiction over mineral resources. At the same time, it can create employment opportunities for the local population and stimulate supporting economic activities including the transport, logistics, supply and technical services sectors. In terms of environmental protection and sustainability. We also— while we want to pursue REE industrial development, we cannot in any way allow it to affect environmental sustainability. In this regard, the government emphasises that all mining activities must comply with the laws, procedures and approval conditions in force, including the environmental impact assessment, or EIA, and also the approval of the Operating Mining Scheme (OMS). All of these must be complied with. At the same time, Mr Speaker, I must mention one more thing here: although we have these REE resources, we still maintain the position of not
allowing mining activities in permanent forest reserves, protection areas and environmentally sensitive areas, in line with current policy and legislation. However, we know there are new technologies and studies that have been done, and these will be pursued to examine the feasibility, feasibility, of activities taking place within permanent forest reserves. In conclusion, Mr Speaker, Honourable Member, we do not want REE industrial development to be merely a mining policy. We want it to become a high-value strategic industrial development policy that guarantees sovereignty over resources, guarantees mastery of technology and provides economic benefits to the people. Thank you.
Thank you, Minister. Honourable Member, for a supplementary question, please proceed.
Yes, thank you, Mr Speaker. Thank you, Honourable Deputy Minister. I am confident that we do not differ in views on developing rare earth resources. Indeed, we believe that if we change places after the general election (PRU), we will do even more for the country in this regard. Only, only Honourable Deputy Minister, I have heard a lot in the select committee and so on, and I want to ask the Honourable Deputy Minister: what is the status of the rare earth mining project in Gua Musang that was recently said to have been approved by the ministry, which has obtained EIA approval, with respect, Environmental Impact Assessment? The reason is that if we look at the leaching technique— larut lesap, with respect, used there, I think the government has not yet clearly explained it to the people. Do NRES or the Department of Environment have the capability and skills to assess the capability and safety of this technology, because I think this is something new? So, there is a lot that is opaque in terms of information. We do not know the real status of the technology. So, can the Honourable Deputy Minister explain to the people whether the leaching technique used at this rare earth mine in Gua Musang is truly safe?
Please, Honourable Minister.
Thank you, Honourable Member for Machang. Thank you, Mr Speaker. So, regarding the first point, I heard from the views of the Honourable Member for Machang earlier that this policy is good. It will be continued, and if this government remains, it will be continued. So, for that reason, in my view, we take it into account as a strategic policy...
[Bangun]
As for the status of the mining project in Gua Musang that the Honourable Member for Machang mentioned earlier, this is a project between Carester and Malaco, where this project is a joint venture undertaking. Carester is from France and Malaco is from Malaysia. And recently we have signed a memorandum of understanding— an MoU between Malaysia and France, which is also related to what the Honourable Member raised earlier. So, in terms of this mining project, indeed, it is taking place in Gua Musang and it will be brought to the plant or centre for this mining, in Gopeng, Perak. So, in terms of the study, survey and so on, it requires a thorough review regarding the EIA, as well as another one, the operating mining scheme, which is the OMS. Both of these have been approved. That means, they have undergone an in-depth review so that all environmental impacts can be ascertained and the environment is not polluted. However, for the Honourable Member's information, under several acts— I want to mention them so that this is clear. The Minerals and Geoscience Department Malaysia, JMG, for example, is responsible for enforcing the Mineral Development Act 1994. This is to regulate the technical and safety aspects of mining through the Mining Operation Scheme (OMS) and compliance with the SOP for REE mining. The second is the Department of Environment. It enforces the Environmental Quality Act 1974, in particular the requirements for the EIA assessment, water pollution control and the management of scheduled wastes. Meanwhile, the Atomic Energy Department of Malaysia, through the Atomic Energy Act 1984 [Act 304], regulates radiological safety and radioactive materials, including naturally occurring radioactive materials, or NORM, referred to as NORM under the applicable legal provisions. So in short, we do not take this lightly, we do not treat pollution lightly, and we will monitor water quality, waste management, the rehabilitation of the mining areas carried out and enforcement action will be taken against any violations that occur. Thank you.
Thank you, Minister. Please, Honourable Member for Pulai.
Thank you, Deputy Speaker. In the meeting or visit of the President of France to our country recently, it was mentioned that the industries that will be involved or the projects that will be implemented from now on are REE projects, and there may have been some before. So, can the House be informed about the latest developments? There may be improvements and so on compared with before, because this matter
is still new, isn't it, something just signed recently. Are there any new additions and new added value resulting from the visit of the President of France recently?
Honourable Minister, before you answer the Honourable Member for Pulai. Gua Musang is the place where many Orang Asli of the Temiar tribe live. In the assessment regarding the opening up of these rare earth resources, did they take into account the way of life and daily customs of the Orang Asli Temiar community living in Gua Musang, Kelantan? If the impact could involve damage, disease and so on that have happened before, I hope that what the EIA presents is relevant. Please proceed.
Thank you, Mr Speaker. I must answer the supplementary question from the Speaker first. I will answer the Honourable Member for Pulai's question later. First, we must take everything into account, Mr Speaker. So in this context, it is not only about land, but about the community, the impact on the community. We already know what happened in Bukit Merah and in other places. So, of course, this matter is taken seriously. And I will carefully consider and take seriously the views of Mr Speaker just now so that this matter is not set aside. Regarding the question from the Honourable Member for Pulai, I have touched on it briefly earlier regarding the memorandum of understanding between Malaysia and France. In fact, in terms of this agreement, its original agreement is between B2B, or business-to-business, between Carester and Malaco, companies. The purpose is indeed to look at ways of developing the REE industry in the country, its process from the upstream, midstream, all the way to the downstream stage. So in that context, we discuss and negotiate with all parties, actually, including France, the United States, Japan, India and others. So, in terms of Malaysia's assessment, we are open, but the main factor is that we need to have mastery of the technology. We already know that the technology currently dominant in the REE industry is China's. They are far ahead, but in that context we have an advantage, namely that we have an advantage in raw materials. Our raw materials, high-value REE, must be safeguarded carefully because this is our material. That is why in this matter, we also cannot at the same time want to control everything without being able to open up for the purposes of negotiation, for the purposes of R&D, but it must have reciprocity. So, in this memorandum of understanding, specifically together with the French side, we emphasise several matters.
The first is for us to cooperate, focusing on critical minerals, specifically REE, which can bring economic importance, but at the same time respect national sovereignty and also the domestic legal framework. So, we have a moratorium on REE exports, we have guidelines that we have prepared, and we will also ensure that there are efforts to continue the MoU through a joint working group together with Malaysia and also France. We will also have technical exchanges and knowledge so that we gain mastery in terms of technology, in addition to missions, trade missions, namely under MITI. So, overall, we want to see this agreement run well, but we are also not limited to negotiations with any other country. Thank you.
Thank you, Honourable Minister. Now the House proceeds to question 11, which is the last question before oral replies are concluded. Honourable Puan Young Syefura binti Othman, Honourable Member for Bentong, please.
Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Bentong question number 11.
The Minister of Transport, please answer.
11. Puan Young Syefura binti Othman [Bentong] asks the Minister of Transport to state the target for the modal shift of freight transport from road to rail (modal shift) set by the ministry after the ECRL begins operations. What percentage of freight is expected to shift from lorries to trains within the first 5 to 10 years of operation and what incentives will be provided to companies.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, for the information of Honourable Members, the East Coast Rail Link (ECRL) Project is among the country's strategic infrastructure that will support the shift of freight transport from road to rail, or road to rail. In terms of implementation, ECRL freight services are scheduled to begin operations in January 2027. For the Bentong to Pasir Putih alignment, while the spur line including to the port will be opened in phases. This phased implementation is expected to strengthen the national logistics network and improve the efficiency and competitiveness of rail-based freight transport.
In this context, the government's aim is not to replace road freight transport entirely with lorries, but rather the approach to be developed is intermodal transport, in which rail is used for long-distance freight journeys. Meanwhile, lorries will continue to play the role of first mile and last mile, from customers' premises to the rail terminal and onward, to the final destination. The shift of freight from road to rail in the first five to 10 years of ECRL operation will depend on market demand developments as well as service capacity following the implementation of ECRL freight operations, which are scheduled to begin in 2027. Among the factors that will determine the rate of this shift are the volume and type of freight, frequency of deliveries, cost competitiveness, rail transport, terminal and freight facility readiness, connectivity with ports and industrial areas, and the efficiency of first mile and last mile connections. Accordingly, the government's approach is to develop the use of ECRL freight in phases based on actual market demand, by focusing on freight movements that have large, consistent loads and are suitable for long-distance rail transport. An ECRL freight train consisting of up to 45 wagons is capable of carrying a load of approximately 3,150 tonnes. Based on the load capacity of a lorry of up to 40 tonnes, one trip of an ECRL freight train has the potential to replace approximately 79 lorries on the road. This shift has the potential to help reduce road congestion, carbon emissions and the risk of accidents involving heavy vehicles. At the same time, Malaysia Rail-Link Sendirian Berhad (MRL) and ECRL Operation Sendirian Berhad (EOHB) will continue to work together with port authorities, state governments, cargo owners and logistics industry players to develop a freight ecosystem along the ECRL alignment and attract more movements of consumer goods using rail. For the Bentong area in particular, efforts to identify industries and cargo owners with suitable volumes and delivery frequencies for the use of ECRL will continue, including for movements between industrial areas in Bentong and the Port of Kuantan, the Port of Klang and other markets along the ECRL corridor. Therefore, the success of road to rail will not be assessed based solely on a single percentage figure, but also on the increase in the volume of freight using rail, the participation of cargo owners, the utilisation of train capacity and the reduction in dependence on lorries for long-distance journeys. The government will continue to monitor developments
in the use of ECRL freight after operations begin and strengthen the necessary measures to ensure that the shift from road to rail takes place in a sustainable and continuous manner. Thank you.
Please, Honourable Member, for a supplementary question.
Good. Thank you, Honourable Deputy Minister. Indeed, when the ECRL is completed, it will benefit all Malaysians, especially in the East Coast. Not only for passengers. Often nowadays we talk about passengers, when it can reduce journeys on the road, but when there is also freight, it will provide— as people say, safety benefits on the highways that exist. So I would like to ask, what is the average travel time and transport cost per tonne or per container through the ECRL compared with lorries? And, is it competitive enough to attract entrepreneurs to use this freight service? And secondly, are there plans to connect the ECRL with the KTMB Berhad network and the main ports to ensure that the first mile and last mile connections run smoothly. Thank you.
Minister, please answer.
Thank you, Honourable Member for Bentong. On the matter raised by the Honourable Member just now, which concerns containers compared with lorries, yes, through the ECRL. For freight services, the ECRL train is capable of operating at speeds of up to 80 kilometres per hour. Consequently, it is expected to offer a smoother and more consistent journey for transporting goods to the East Coast compared with road transport, which is also affected by traffic conditions and congestion.
As for cost, the freight tariff structure of the ECRL will take into account the need to ensure that the services offered are competitive compared with road transport. The rate setting must also take into account the overall logistics cost, including cargo handling and delivery to the final destination, to ensure that ECRL services become a competitive choice and can encourage the shift of transport from road to rail. As for the second point raised by the Honourable Member, which concerns the connection of the ECRL with the KTM. The government certainly takes into account the aspect of
connectivity between the ECRL route network and KTMB as well as the main ports through integration stations such as at Temerloh Station, and also at Bandar Serendah Station. In addition, there is the development of the Serendah Bypass for KTMB, which connects directly from Serendah to the Port of Klang. The construction of Section D of the ECRL also involves a direct connection to Northport and Westport at the Port of Klang through the provision of separate tracks for ECRL and KTMB services. This connectivity is expected, God willing, to increase the efficiency of freight transport and support the integration of transport between rail, ports and land logistics networks, to facilitate the movement of goods from the place of origin to the final destination, God willing. Thank you.
Thank you, Honourable Member. On the left, the Honourable Member for Setiu.
Deputy Minister, my question. Farmers and fishermen from the Setiu District and the Besut District send their produce to the station in Dungun or Kuala Cukai, because there is no station in Setiu or Besut for this cargo transport; there is only one for passengers. So, is the government prepared to establish cargo transport and cargo services at both of these stations? My second question: does the government intend, or is it prepared, to table an annual performance report on this cargo transport? Because we find that ECRL finances depend entirely, heavily dependent on this cargo transport, and the government should table it, and we want to know the actual total of cargo, the actual tonnage transported, and what projections the government has made? That is all, thank you.
Silakan Menteri.
Thank you, Honourable Setiu. Regarding the question raised by the Honourable Member just now, which is whether it is possible to set up a cargo station at both of these locations. So, we will see. We have not yet begun operations. God willing, once it operates, we will look at current needs. This matter is dynamic. Second, regarding that report. God willing, there is no problem. There is nothing to hide lah. Whatever people say, the progress on transport and so on for this cargo. It is true that the government is spending so much with the Chinese Government, but yes lah, we too want to see how it is—the operation of this train in the long term. Thank you, God willing.
Thank you, Honourable Member. Honourable Member, normally it is two from the right, one from the left, but since this is the last question, I will allow the question.
Thank you, Honourable Member.
The Minister must reply [Applause].
I have received news that the ECRL will be launched on 12 December. Congratulations, good. Just now, Bentong raised that question, and indeed it was the right decision when we brought its alignment through Bentong to Serendah and looked ahead. Only three weeks left, but under the APAD Act, Act 715, any permission to open a railway system must obtain the signature of the Minister of Transport. That is in its conditions. Yes, the Director-General of APAD can sign, but for a new scheme it must obtain approval. Under the present circumstances, do we have a contingency plan for when it reaches the 12th day of the month, a week or 10 days before that, this approval must be in place? Are we on standby, do we have a contingency, or how is it? Because without that, the launch cannot be carried out. I just want to ask what contingency plan the MOT has. Thank you.
Sila Menteri.
Thank you, Honourable Member. So, before, I too was with you, my first round in MOT with the Honourable Member as Minister, I was Deputy. The second tour, different boss lah. So, let us wait until—before this, whatever may happen this week, there will be an appointment of a new Minister of Transport. So, that is all I can answer. Indeed, it is true, it does require the Minister's signature. That is definitely true. In fact, I already telephoned the KSU yesterday to discuss how we are going to launch this, but yes lah, hopefully, I am confident that the government leadership, God willing, will look into this matter. Because later, on the 12th day of the month, I am also informed that the launch will be carried out by the Most Honourable Prime Minister too. God willing. Thank you.
Alright, Honourable Members, now the session for Question Time for oral answers is concluded. [Question Time for Oral Answers concluded]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Dato' Sri Mr Speaker, "Under Standing Order 12(1), I respectfully move that today's Sitting shall not be adjourned until the debate and decision at the Committee Stage of the Ministry of Housing and Local Government and the Ministry of Investment, Trade and Industry on the Rang Undang-undang Perbekalan 2027 and the Usul Anggaran Perbelanjaan Pembangunan 2027 have been completed, and after that the Sitting shall be adjourned until 10 a.m. on Monday, 23 November 2026."
Is there any Honourable Member who supports?
Honourable Dato' Sri Dr. Mr Speaker, I respectfully second.
Alright, thank you. Honourable Members, I now put the question to the House for decision. The question is that the motion as moved just now be agreed to.
[Motion moved for decision; and agreed to]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 CommitteeBill
The Order of Business was read to resume consideration of the "Rang Undang-undang Perbekalan 2027 and Usul Anggaran Pembangunan 2027 in the Committee of Supply." [Tenth Day] [The House sat in Committee]
[Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
Honourable Tanah Merah, Honourable Pendang, I will give space for a chat. Go on and chat. Since earlier. If you want to be the headmaster, you can. No problem, but please respect it when the Minister is answering; the other Honourable Members are asking. So I ask, if there are several of you, please do it outside, yes. We do not want to be like school children. We are adults. Alright, please lah. These two are my friends too. Once more, I will throw you out. Alright.
Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.43 [Schedule] – Head P.43 [Development Estimates 2027] –Bill
In the Committee of the Ministry of Housing and Local Government. Supply Head B.43 and Development Head P.43 under the Ministry of Housing and Local Government are open for debate. Honourable Members, the list of debaters numbers 26 persons. I will read out the following list. Honourable Members take note that at 1 o'clock we will stop for a break. So, estimate your position to debate after the names are called. The debate will be opened by the Honourable Jelutong, Honourable Maran, Honourable Beaufort, Honourable Padang Serai, Honourable Gopeng, Honourable Kuantan, Honourable Shah Alam, Honourable Hulu Selangor, Honourable Bakri, Honourable Rompin, Honourable Sri Aman, Honourable Parit, Honourable Betong, Honourable Pendang, Honourable Ampang, Honourable Temerloh, Honourable Klang, Honourable Langkawi, Honourable Keningau, Honourable Selayang, Honourable Kuala Krai, Honourable Rasah, Honourable Tumpat, Honourable Pulai, Honourable Kangar, and it will end with the Honourable Seputeh.
Honourable Members, please try to avoid submitting names at the last minute because it will create time constraints. So, as advice, however, to decide whether the Honourable Member's request is accepted or not, it remains with the Chairman of the House, yes. Alright, I now invite the Honourable Jelutong to open the debate. Please, Honourable Member.
Thank you, Mr Chairman. I begin my debate by giving an expression from Mahatma Gandhi; "The greatness of a nation can be judged by the way its animals are treated." The greatness, progress and civilisation of an advanced nation can only be judged by how that nation, among other things, treats animals such as dogs and cats. I touch on this matter, Mr Chairman, because in recent times there have been many incidents involving these animals, and until today― I apologise if I am mistaken, there has been no Member of Parliament from that side who has stood up to voice these matters involving pet animals. I touch on Head 02400 – Town and Village Planning, 020100 – Local Government, 020500 – Urban Sustainability. I heard from the Honourable Putrajaya about the nuisance of stray dogs. In my area too there have been incidents of stray dogs. And I touch on two incidents that occurred, for the knowledge of Mr Chairman, Mr Speaker Mr Chairman. The first incident occurred on 6 October 2024 in Besut, where the Besut City Council shot dead 'a' stray dog named Kopi...
Seekor.
Ah yes, one. Forgive me. One stray dog named Kopi. I made a slip, I apologise. So much of what we are quoting here, quoting there, I slipped, yes. One stray dog named Kopi. Then, another incident occurred at the Klang City Council in Taman Teluk Gedung Indah, Port Klang, involving another dog named Rocky. The incident on 29 July 2026. So, when the incident― and recently, Mr Chairman, Mr Speaker, a viral video showed a person hanging a cat by its neck from the cat, driving the vehicle with the cat hanging, which happened in Johor on 12 November recently. I want to ask the government, what steps are being and have been taken to ensure that these stray dogs and stray cats are either looked after by the respective City Councils, the Local Authorities of the states— the sterilisation process. In Penang, for example, the Penang City Council set up a shelter for us to catch these stray dogs, sterilise them and so that
ensure they do not cause any nuisance to members of the public who may be exercising, who may be walking back and forth here and there. So, this is my request. We must respect the rights of these animals too, and I stand as a backbencher to ask the government what steps have been taken. I do not want incidents that befall dogs like Rocky and Kopi to happen again because they went viral and the fallout is borne by our government. At the same time, I want to ask, what has happened. In my area, the Honourable Minister announced a public housing project in Kota Giam, Jelutong, on the proposed site of the Kota Giam, Jelutong, Penang Public Housing Project, namely in 2022 when the project was proposed with a total cost of RM200 million to build 100 PPR units in Penang in the Kota Giam, Jelutong, Penang area. So, I want to ask the government, what is the current status of that project and what is the latest information or latest developments, because the project was announced, but up until now no land work has begun. And I hope that indeed this constraint is a constraint faced by all states; 100 PPR units in Penang will certainly resolve various housing problems in my area. So, I ask that both of these matters be given attention. I believe our government is indeed concerned about the problem of public housing and also the problems that befall animals such as dogs and cats. Mr Chairman, Mr Speaker, thank you for the opportunity given. Greetings of unity, greetings of Malaysia MADANI.
Thank you, Honourable Jelutong. The House hereby invites the Honourable Maran.
In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings of peace. Thank you, Honourable Dato' Sri Chairman, for allowing me to debate the Supply of the Ministry of Housing in the Committee Stage. Honourable Dato' Sri Chairman, shelter or residential accommodation is among the basic needs of humankind. At the start, I want to ask: the population of Malaysia now is roughly 34.4 million people. So, I want to ask the Ministry of Housing and Local Government whether there is information, what is actually the nationwide housing need.
Second, what is the total housing that already exists and has been built across the country based on the needs of this population. I see that the growth and development of housing today is not to provide homes for people who need housing, but rather more to fulfil the wealth desires of housing companies so that they become richer. Indeed, many houses are owned by well-off people who have wealth; they buy houses and rent them out to increase their wealth. And now, what is the total number of first-home applications made by Malaysians across the country? Dato' Sri Dr. Chairman, the operations of the local authorities across the country also depend on direct allocations from the ministry. My question is, what is the total direct allocation from the KPKT to local authorities across the country by local authority, including the state of Pahang and Maran in particular. Second, what is the total amount of government expenditure in financing electricity bills, because part of the electricity expenditure in local authority areas is borne by the local authorities themselves and borne by the government. So, how much has the government financed for local authorities, including Maran. What are among the government's strategies in helping these weak local authorities so that they can increase their income to finance their daily management? Dato' Sri Dr. Mr Speaker, Chairman, I want to refer to P.43 Head 01600 – Rented Public Housing and 01513 – Owned Public Housing. The development estimate for rented public housing fell from RM5.53 million in the amended estimate 2026 to RM1 million in 2027. In the same Schedule, the estimate for owned public housing increased from RM190.51 million to RM370.46 million. For families who are not yet able to buy, rental housing is their first choice. I want to ask, how many eligible families are still waiting in each state and how many units will be provided for them in 2027?
Dato' Sri Dr. Chairman, Orang Asli villages were also once affected by communist influence. They were placed in resettlements deep in the forest. What— I want to propose that the Ministry of Housing include these Orang Asli villages too under the Ministry of Housing and that they be placed under the monitoring of the Ministry of Housing. Housing assistance, not specifically for the new villages but also for the new villages involved, not only communist villages but resettlements including Orang Asli.
I feel that JAKOA's allocation is not enough to cover the development of Orang Asli villages, and we want their lives to also continue to progress like other communities. Dato' Sri Chairman, I refer to B.43, Head 030100 – Fire and Rescue. The maintenance estimate increases by RM15.6 million. I ask the Minister to state the actual achievement of 2026 and the baseline for the target coverage of 66 per cent. How will this additional allocation help the districts that have waited the longest for assistance? I also want to ask the ministry. When will the proposed construction of a new fire station in Maran, in Kampung Awah or in Chenor be built, because this proposal has long been raised. The site has been identified, but this new government has eliminated the project. Next, Dato' Sri, namely owned public housing concerning PPR Luit in Taman Sungai Kemap in Maran— 42 recipients received keys in August 2026. On that date, 46 of the total 100 units still could not be handed over because of slope stabilisation work. Is this work continuing? How many of these 46 units have been handed over to recipients and when will the remainder be handed over? Finally, Dato' Sri Chairman, a flash flood on 25 May 2026 affected approximately 47 houses and 188 residents in the Sri Jaya Makmur locality. What was the cause identified through technical assessment? What— what drainage upgrading work at Sri Jaya Makmur has been approved under Head 00100 – 27? If yes, state the scope of work, the implementing agency and the completion date. If the application is still being evaluated, when will the decision be communicated to the residents? I ask the Minister to answer these matters in the winding-up with figures and dates that can be checked by the House, because I want the people in my area, across our country, to be aware that this is responsible government work. Be responsible so that we ensure the lives of the people are better, more successful and for their future. Thank you, Dato' Sri Dr. Chairman.
Thank you, Honourable Maran. The Honourable Beaufort is invited.
Thank you. In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you and greetings of peace. Thank you, Dato' Sri Dr. Chairman. I want to touch on the Development Purpose for Head 00100 – Small Projects in Local Authority Areas. Head 01513 – Owned Public Housing. Head
Item 01600 – Rental Public Housing and Item 30002 – Construction of Buildings for the Fire and Rescue Department of Malaysia (JBPM) in Sabah. First, I would like to express my appreciation to the government for the total allocation of RM6.355 billion to the Ministry of Housing and Local Government (KPKT) for 2027. Dato' Sri Dr. Chairman, I welcome the increase in the allocation for small projects of local authorities (PBT) to RM689.06 million, compared with RM447.23 million in 2026. However, I hope Beaufort and Kuala Penyu will also be given attention, particularly for upgrading public facilities, drainage systems, markets and dilapidated infrastructure. The distribution of allocations should take into account the actual needs of the community, including small towns and peri-urban areas. I would like an explanation: how much allocation has been provided to the Beaufort and Kuala Penyu District Councils for 2027?
Dato' Sri Dr. Chairman, based on the Auditor General's Report 2026, the PPR Taman Permai Selagon project valued at RM23.70 million, involving 67 housing units, still cannot be occupied as of July 2026 due to structural damage caused by ground movement. What is more worrying, the repair contract valued at RM2.72 million was terminated on 11 March 2025, with physical progress at only 15 per cent. I wish to stress that these 67 housing units are the rights of the people of Beaufort, which have yet to be enjoyed. Hence, I request the ministry to explain the remedial measures, including soil stabilisation, the appointment of a new contractor and the timeline for completing this project.
At the same time, more than 1,000 households in Kampung Melati, Bakalau, Jimpangah and Kuari face the risk of losing their homes due to land eviction notices. In view of this, I repeat my request for at least 1,000 new PPR units to be built in Beaufort to help the affected families. I also take note of the approval of 200 units of the Program Residensi Rakyat in Kuala Penyu under the RMK12 Rolling Plan 3. I hope this project will be expedited and that the ministry will explain the tender status, project value and implementation schedule. In addition, I urge that PPR development in Beaufort be considered in phases and that the Program Rumah Mesra Rakyat be expanded to low-income families.
Dato' Sri Dr. Chairman, to me, housing is not merely about providing shelter, but a matter of welfare, safety and also the dignity of the people's lives. Do not let the people keep waiting, when their need for safe housing is becoming increasingly urgent.
Dato' Sri Dr. Chairman, the last matter is the need to strengthen fire services in Sabah. In particular, the proposed construction of a mini fire post (mini balai bomba) in Menumbok, Beaufort. I take note of the increase in the allocation for the construction of GBPM buildings in Sabah to RM4.38 million for 2027, compared with RM3.04 million in 2026. However, the fire service needs in Sabah must take into account geographical area, travel distance and the income status of residents.
Dato' Sri Dr. Chairman, I wish to stress that the request for the construction of a mini fire post in Menumbok is not a new matter. Since 2023, I have repeatedly raised this matter in every debate session in this august House. This need is very urgent because the residents of Menumbok still depend on fire assistance from Kuala Penyu, which takes about one hour's travel to reach Menumbok. What is more worrying, several fires have occurred in Menumbok that could not be saved by the fire team due to the long travel distance. In a fire situation, every minute is precious. Delays in the arrival of assistance can result in the destruction of property and threaten the lives of residents. We do not want to wait until a greater tragedy or loss of life occurs before this request is given attention.
Hence, I urge the ministry to consider a specific allocation for the construction of a mini fire post in Menumbok under Item 30002 for 2007, including the provision of equipment, personnel and operational supplies. I would also like an explanation: has this project been included in the GBPM development plan, and when can it be realised? I hope the request that has been voiced since 2023 will finally receive attention and concrete action from the ministry. The safety of the people's lives should not continue to wait.
Thank you, Dato' Sri Chairman.
Thank you, Honourable Beaufort. The Honourable Padang Serai is now invited. Please proceed, Honourable Member.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Dato' Chairman. Within this limited time, I would like to convey the heartfelt voice and genuine concerns of the people in my constituency in the Padang Serai Parliament, which I believe also reflect the realities of life for the majority of the people across the country.
First, Dato' Chairman, I refer to the operating expenditure under Item 030200, Item 030600 and the development expenditure under Item 01513 and Item 40000. Mr Chairman, we often hear various announcements of housing initiatives in every budget presentation.
However, the reality faced by the grassroots today is very different. The price of residential homes in the open market has now soared to an unreasonable level compared with the salary levels of middle-income Malaysians. In areas such as Kulim and Padang Serai, where thousands of young people work in the manufacturing and industrial sectors, the price of a single-storey medium-cost terrace house has already jumped to between RM290,000 and RM350,000 for a factory worker or a support-grade civil servant. This figure is like a dream in broad daylight. The big question I want to put to the Honourable Minister is: what real and concrete mechanisms do the government and KPKT have to prevent house prices from being continuously manipulated by the market? For a long time, we have often— look, the government's approach has focused more on facilitating access to financing, such as the Housing Credit Guarantee Scheme (SJKP) or stamp duty exemptions. Padang Serai would like to remind the ministry that when loans are made easier without firm ceiling price control mechanisms on construction costs and developers' profit margins, house prices will continue to soar. In the end, it is not the people who are helped, but the developers who reap profits from— manifold, while the people are forced to bear debt burdens until retirement age.
Therefore, Padang Serai urges the government to undertake a paradigm shift. The government must increase the construction of affordable homes priced below RM200,000 on a large scale, with direct subsidies from the government. Like the public housing models that have proven successful in developed countries such as Singapore through HDB, or social housing policies in European countries and also Japan. In those margin countries, housing is regarded as a basic necessity and a social responsibility of the state, not merely a commercial commodity. The governments there intervene directly by contributing government-owned land free of charge or at nominal rates, and by bearing the subsidy for basic infrastructure costs such as roads, water and electricity supply, so that these costs are not passed on to buyers.
Therefore, I seek an explanation: to what extent is KPKT prepared to overhaul the existing policy by mandating higher quotas for landed homes or comfortable apartments priced below RM200,000 with a minimum area of 900 square feet, through cooperation with agencies such as SPNB and Prima? Rather than letting the people continue to be squeezed into buying RM300,000 homes that are only small in size.
Second, Mr Chairman, I would like to redirect the Honourable Minister to the operating expenditure under Item 030100 – Fire and Rescue, amounting to RM1.138 billion, and the development expenditure, Item 30000 – Construction of JBPM Buildings in Peninsular Malaysia, allocated RM67.1 million in 2027. I wish to raise again the very critical and urgent request from the residents and business community in my area, namely the construction of a new fire and rescue station in Padang Mihar in the Padang Serai Parliament.
For the information of this august House, Padang Mihar has now emerged as a rapidly rising new industrial and development hub. Its strategic location, bordering directly the high-technology industrial zone of Kulim Hi-Tech Park, has attracted dozens of large-scale factories, warehouses and logistics operations, as well as the construction of thousands of new housing estate units. The population and workforce in the Padang Mihar corridor have increased manifold in the past few years. However, this economic growth and population increase have not been matched by basic safety facilities. To date, the Padang Mihar area still does not have its own fire station. In the event of a fire or industrial accident, emergency assistance has to be deployed from the Kulim Hi-Tech Fire Station or the Sungai Petani Fire Station. The increasing travel distance and worsening traffic congestion on the main routes of Kulim, Baling and Padang Serai, Sungai Petani during peak hours cause fire engines to take a long time to reach the location.
Hence, Padang Serai requests a clear and comprehensive answer from the Honourable Minister on the latest status of the application and the land acquisition process for the proposed construction of a new fire and rescue station in Padang Mihar. Will the ministry list the Padang Mihar Fire Station Construction Project as a priority project under Item 30000 in this 2027 Budget? Thank you, Dato' Chairman.
Thank you, Honourable Padang Serai. The Honourable Gopeng is now invited.
Thank you, Dato' Chairman. I would like to raise issues relating to P.43 under Head of Item 01901 – Urban and Village Planning to Item 01906 – Regional Planning. There are four issues I would like to raise. The first is that drainage design must keep pace with climate change. Based on available information, the intensity of heavy rainfall within a short period in Kuala Lumpur has already increased by about 35 per cent over the past 30 years. This means urban drainage systems need to accommodate a larger volume of rainwater compared with past years. It is indeed true that the intensity of natural disasters is increasing. However, we must take into account various aspects, especially in the engineering monitoring system. We are aware that the Department of Irrigation and Drainage (JPS) has already taken climate change factors into account in Hidrological Procedure No. 1, published in 2015, particularly for flood mitigation projects under the government. However, private development projects still largely refer to the Malaysian Stormwater Management Manual Second Edition— MSMA second edition, published in 2012, which may not fully take into account the risks of climate change and the increase in extreme rainfall in the future. The question is, why does a difference in standards still exist between government projects and private development projects approved by the local government? Therefore, I urge the government to make it mandatory for all new development projects to use appropriate climate change parameters in drainage design, so that the infrastructure can withstand the risk of heavy rainfall in the future.
Second, relating to the management of retention ponds in urban areas, especially. We know it is an important facility in the flash flood control system, especially in urban areas. However, the construction of these catchment ponds— these reservoirs are not only— it does not mean that it cannot resolve the flood problem thoroughly. But based on the information I have, taking Selangor as an example, we have about 600 retention ponds to address flash floods, but records show that between 200 and 300 have not yet been formally handed over under the supervision of the relevant agencies, thus creating uncertainty in terms of maintenance responsibility. At the same time, there are also allegations that the area of several retention ponds in Kuala Lumpur, Federal Territory, in major cities in the country
are increasingly diminishing, with a visible reduction, due to changes in land use, thereby reducing urban water retention capacity. In this regard, the government needs to establish an official registration system for flood retention ponds, clarify ownership and maintenance responsibilities, and make independent measurement and certification of completed construction mandatory. We need to ensure that the facilities built truly conform to the approved plans and not merely meet requirements on paper.
The third is about engineers' accountability. These two issues are related to engineers. We cannot simply allow a practice where developers are seemingly given room to check and certify their own designs without strict professional oversight. If engineers and local authorities merely accept and proceed with plans submitted by developers without rigorous assessment of actual site conditions, including topography, soil conditions, groundwater levels and surroundings, safety risks may not be identified early. Based on available information, the maximum fine for certain disciplinary cases under the Board of Engineers Malaysia (BM) is only RM50,000. The question is, is this amount still adequate to have a deterrent effect should a professional misconduct occur that could result in major losses and even threaten lives? We have been shocked by many major tragic cases that have claimed lives and caused losses of millions of Ringgit. These relate to system failures, slope drainage and retaining walls, design weaknesses, space frames, failure to carry out accurate slope engineering calculations, and so on.
Therefore, I would like to suggest that the government review penalty and fine rates, strengthen investigation and enforcement capabilities, and clarify the responsibilities of engineers and suppliers, so that the action taken is truly commensurate with the offence. Lastly, when we see engineering failures occur, apart from determining the party responsible, we must also ensure that victims receive appropriate compensation. At present, the Akta Pendaftaran Jurutera 1967 or Registration of Engineers Act 1967 does not comprehensively stipulate that all engineering consultancy firms or ECPs are required to hold Professional Indemnity Insurance (PI insurance) as a condition for registration and licence renewal. This is closely related to KPKT, because this party is involved in the planning, design and approval of development projects under the control of local governments and
in the event of professional negligence in engineering design. Even if victims succeed in legal action, what guarantee is there that they will actually receive compensation if the responsible company has no assets or sufficient financial capacity? Therefore, finally, I urge the government to review the proposal to make PI insurance a mandatory requirement for the registration and licence renewal of engineering consultancy firms, and also to consider the need for insurance protection after firms cease operations or terminate their services, through a run-off cover mechanism, to ensure protection against claims arising from previous professional work. That is all. Thank you, Dato' Chairman.
Thank you, Honourable Gopeng. Next, Honourable Kuantan, please proceed.
Thank you, Dato' Dr. Chairman. Assalamualaikum warahmatullahi wabarakatuh.
Waalaikumussalam.
Next, I would like to move on to Item P. 00100 – Small Projects of PBT. The allocation increased from RM447.23 million to RM689.06 million. So, regarding these small projects, I would like to bring up one example, a project at Pasar Kuantan, where the food stalls at Pasar Besar Kuantan were completed for upgrading in mid-2025 using the allocation. So, the additional dining area that was provided, so— its aim was to make it convenient for the public. However, we are now receiving complaints from traders and customers regarding part of the roof, which uses translucent (lut sinar) material. So, its purpose may be lighting, but it causes sunlight to pass straight through, and traders and customers feel the heat. So, apart from that, sinks are also not provided compared with before the renovation was carried out. So, traders here have to provide hand-washing water drums. Sinks are not provided, only hand-washing water drums. So, the absence of this facility disturbs customers and also the view, you see. So, apart from that, there is leakage in the rainwater channel during heavy rain between shop lots numbers 115 and 116. So, the question is, how does the ministry monitor the implementation of these small projects? So, I request that the complaints made by traders to the city council be examined and remedial action be taken. Many new housing estates being developed in
Kuantan. I would like to obtain an explanation: does the government intend to require developers to provide facilities such as children's playgrounds and sports courts? If not, is the local authority (PBT) prepared to bear that cost when applications are made by these new housing estates? For example, we received information from the Residents' Association of Taman Kempadang Indah, which applied for the upgrading of the sports court in that area. So, I would also like an explanation on this issue. Next, Item B.020000 – Sustainable Urban Environment. I want to raise an issue of flash floods caused by residential development that is not balanced by an increase in the capacity of the drainage system. For example, Taman Kempadang Makmur in Kuantan, ten years ago, never experienced flash floods. So now, when it rains heavily for two or three hours, the water has already covered the road and the area of that housing estate. So, ten years ago the drains in this area may have been able to accommodate the water flow capacity, but now it may no longer be suitable. Likewise, another location, the PPRT Kempadang, is also facing drainage problems. When it rains heavily for two or three hours, the drain water overflows and enters the houses in that area. So, this is not the first time, and it happens frequently. So, the cause is that the drains here are very narrow. The water cannot even get out in time to the larger drains. So, the proposal is that the drains must be enlarged and drainage must be kept from becoming blocked. I also looked at the status page of the Kuantan City Council, which carried out a gotong-royong (community clean-up) at that location in December 2025 as preparation for the monsoon season. So, I question this matter because we are about to face monsoon seasons like this. So, the question is: does the local authority carry out a cumulative impact assessment of development on the capacity of the existing drainage system, or is the assessment only done separately for each new development project? I propose that the Ministry of Housing and Local Government (KPKT) make regular drainage system capacity audits mandatory in high-risk development areas, alongside ensuring that developers also bear responsibility for upgrading the affected drainage infrastructure, so that existing residents do not continue to bear the flood risk caused by development in the surrounding areas. Moving on to Item B.030500 – Community Well-being. So, I want to raise the issue of premises conducting illegal gambling activities, particularly in areas with a Malay and Muslim majority. Such activities can affect community well-being, cause people to fall into debt, break up family institutions, and also contribute to social ills. So, the question is: to what extent do local authorities monitor the misuse of premises licences for illegal gambling activities? What monitoring mechanisms are there to ensure that premises that have been closed do not resume operations? And I urge the KPKT to strengthen integrated operations between local authorities and the Royal Malaysia Police (PDRM), to tighten action against misuse of licences, and to provide complaint channels that protect the identity of complainants.
Lastly, there are also cases where cows roam around within the town and in housing estates as well. So, I request monitoring from the local authorities. That is all, thank you.
Thank you, the Honourable Member for Kuantan. This concludes the last debate before we take a break for prayers and rest, and therefore I invite the Honourable Member for Shah Alam.
Assalamualaikum warahmatullahi wabarakatuh.
Waalaikumussalam.
Greetings. Salam Malaysia MADANI. Dato' Sri Chairman, I would like to debate several matters relating to people's housing, public housing maintenance, and the responsibility of local government in ensuring safe and well-managed development. First, for Development Purpose P.43, Item 40000, the allocation for the Rumah Mesra Rakyat programme remains at RM500 million. The same as last year. This programme is very important for helping low-income groups, especially those who own land but cannot afford to build their own homes. However, in a situation where the cost of building materials and workers' wages are increasing, I would like to ask the ministry: how many applications have been received, how many have been approved, and how many are still on the waiting list? What is the target number of Rumah Mesra Rakyat units to be built in 2027 with this RM500 million allocation, and what is the justification for maintaining the allocation at this same level? And does the ministry intend to review the level of assistance and construction costs so that this programme can continue to meet public demand? Second, for Development Purpose P.43, Item 04001 – Housing Maintenance totalling RM159 million, an increase of RM25 million compared with 2026. Residents of PPR, low-cost housing, and low-medium-cost housing often face problems of broken lifts, leaks, damaged roofs, drainage systems, and shared facilities that are not well maintained. This is not merely an issue of comfort, but also involves the safety and quality of local residents. I would like to know how many PPR and public housing, low-cost and low-medium-cost housing units require major repairs, and which projects will be given priority in 2027. I would also like to take this opportunity to thank the ministry very much for providing the allocation
to two housing areas that received TPPM allocations this year, namely one in Seksyen 6, Pangsapuri PKNS, and another in Taman Bukit Subang. Thank you, taro leaves; hopefully 2027 can bring even more.
My question is: does the ministry have a long-term maintenance plan? Is there an inventory of low-cost housing, PPR and the like, so that periodic monitoring can be carried out and damage can be reduced? If it is left too long, then comprehensive maintenance has to be carried out, but if periodic monitoring is done, I believe the cost of repair and maintenance can be reduced. And I request the ministry's attention for Shah Alam. In 2027, Pangsapuri Nilam Sari in Seksyen 7 and also Pangsapuri Sunway Sinar in Seksyen U9, which are already quite dilapidated, are almost 30 years old. And thirdly, for Development Purpose P.43, Item 01513 – Owned People's Housing totalling RM370 million, an increase of so much, RM180 million compared with 2026. This is a very positive development shown by the very caring and considerate MADANI Government. However, this increase in allocation must be translated into results that are truly felt by the people. So, how many affordable housing units are targeted to be built in 2027? Built and also completed? What is the breakdown of projects by state, district and price category, and what percentage of units are targeted at the B40 and M40 groups? And finally, Dato' Sri Chairman, the fourth issue, which is currently being hotly debated in this House and outside. Yesterday we already debated at length under the Ministry of PETRA and also MOSTI, namely on the issue of floods affecting urban areas in particular and also in the outskirts of cities, if we talk about Selangor state. So, for Supply B.43, Item 020000 – Sustainable Urban Environment. I would also like to inform you that we indeed often experience flash floods in new development areas. In Shah Alam, the new area is Denai Alam, where development is still ongoing, and in Elmina development is still ongoing. In some circumstances, the drainage system, retention ponds and related infrastructure have not yet been officially handed over to the local authority or the relevant agency. In this period, who is actually responsible for ensuring
such maintenance? I believe that if it has not yet been handed over to the local authority or agency, and since the development is still ongoing, then of course the developer must carry out the maintenance. The issue now is that there are indeed incidents where the retention ponds are not cleaned, and mud keeps rising, reducing the volume of water that can enter the retention pond. That is among the things that cause these flash floods. So, I would like to propose that the local authorities under the KPKT be firm with these developers so that they carry out their responsibility to clean any retention ponds, drainage channels, and anything else still under their control that may cause the flash floods that occur. These flash floods are very short, Dato' Sri Chairman. Perhaps only half an hour, caused by this lack of maintenance. But that half an hour is enough to make Shah Alam and the Klang Valley famous around the world because of these flash floods. So, I request, Dato' Sri Chairman, that the KPKT's budget allocation be translated into real solutions: affordable homes, safe residences, well-managed surroundings, and sustainable and resilient development. Thank you, Dato' Sri Chairman.
Thank you, the Honourable Member for Shah Alam. Honourable Members, the House resumes as the House in session. Bentara. [The House resumes sitting] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
Honourable Members, the sitting is adjourned and will resume at 2.30 pm. Thank you. [The sitting was adjourned at 1.05 pm
[The sitting resumed at 2.30 pm]
[Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
Honourable Members, the House is in Committee. [The House sits in Committee] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) presiding
Bismillahirrahmanirrahim. Let us continue with our business. I invite the Honourable Member for Hulu Selangor.
Bismillahirrahmanirrahim, Assalamualaikum warahmatullahi wabarakatuh and greetings. Thank you, Dato' Sri Dr. Chairman. I move directly to Code B.43, Item 020400 concerning Urban and Rural Planning (PLANMalaysia). I wish to bring forward the voice and concerns of residents regarding the development of a large-scale hyperscale data centre in Serendah, Hulu Selangor. People are asking, but I myself have not been given any notification or information about this project. Residents have the right to know its impact and how their interests will be protected. We are well aware that data centres use large amounts of electricity and water. In addition, the risks of heat emissions, flash floods, road damage, and pollution such as air and noise must also be assessed comprehensively so that the health and quality of life of the local community are not affected. Personally, I see the negative impact as greater than the benefits to the people. It cannot be denied that this development creates employment opportunities, but after the project is completed, how many permanent jobs will there be for local children? Do not let temporary benefits lead to impacts that residents must bear over the long term. Developed countries such as the Netherlands restrict the locations for hyperscale data centre development, while Ireland has tightened conditions for new data centres. If developed countries themselves take cautious measures, how far is Malaysia truly prepared, and has it assessed the long-term impact of this development on the nation's resources and the well-being of the people? The question for which I want an answer from the ministry is: what are the results
of the impact assessment and the measures to protect residents that have been taken? Has a engagement session been carried out with the local community, and do local people agree with this project? Their concerns and interests should be properly taken into account by the government. Let us not merely be proud of billions of ringgit in investment while the risks and burdens are borne by the people. I ask that this matter be given serious attention, especially where it involves the people. Dato' Sri Dr. Chairman, next, Code B.43, Item 30000 concerning Construction of JBPM Buildings in Peninsular Malaysia. I once again emphasise the need for a Fire and Rescue Station in FELDA Soeharto. During emergencies, residents of FELDA Soeharto Gedangsa, Sungai Tengi and Sungai Tengi Selatan, which are the FELDA clusters in Hulu Selangor, have to depend on the Volunteer Fire Brigade or wait for help from a distant fire station. This request is a repeated one. I earnestly ask the ministry to explain the results of the risk assessment and the current status of the land application for the FELDA Soeharto fire station site, and whether its construction is included in this year's budget plan. At the same time, I ask the ministry to explain the joint action of all the agencies involved so that any developments are communicated to us, and we are ready to assist with whatever needs arise. My hope, representing the people of FELDA Hulu Selangor and nearby areas, is that this FELDA Soeharto fire station will be realised in this budget. Dato' Sri Dr. Chairman, lastly, Code P.43, Item 04001 concerning Housing Maintenance. I would like to touch on the issue of strata management. To what extent has the study on the amendment of the Strata Management Act 2013 been carried out, and when is this amendment expected to be tabled? Solutions must take into account the reality of old apartments facing damage, financial constraints and weak management. The approach cannot be fully equated with that for new apartments. If this strata issue remains difficult to resolve and the management can no longer manage it, I propose that the PBT be given the role of taking over management until the issue can be resolved, so that maintenance and residents' safety are not neglected. And for this strata issue, I propose that the Mayor or the Yang di-Pertua Majlis himself lead it, not merely the COB. One more thing: how will the 2027 Budget give priority to allocations and expedite assistance, particularly for damage that causes safety risks such as building cracks and the like.
The funds that have been allocated for the construction of smart toilets (BMW-i) valued at not more than RM1 million each in every state capital of Malaysia would be better used again for urgent repairs in people's apartments across the country. I ask the ministry to re-examine the matters I have raised, particularly I feel it is wasteful to spend a large cost on toilets; it would be better given directly to the people. That is all, thank you, Dato' Sri Chairman.
Thank you, Honourable Member. Next, I invite the Honourable Member for Klang, who is taking over from the Honourable Member Bakri.
Thank you, Dato' Sri Chairman. I would like to raise the issues of weaknesses in urban planning, public amenities, imbalanced housing development, misuse of land, and recurring flood problems in Klang. In Budget 2027, the KPKT received an allocation of RM6.355 billion, including nearly RM700 million for small projects in local authority areas involving the upgrading of parks and public amenities. I welcome this allocation, but the question is whether our city development is truly planned for the well-being of the people or merely adds buildings and new projects. Klang is now known as the "Bandaraya Diraja", but city status is not merely a title. It must be translated through quality infrastructure, cleanliness, safety and orderly public amenities. The Draft Klang Local Plan 2035 itself identifies weaknesses such as housing development that is not strategic, a shortage of community facilities, an inefficient transport system, and insufficient pedestrian walkways.
I would like to ask the KPKT: what benchmarks are used to assess the performance of MBDK after it was upgraded to city status? Does the ministry monitor improvements in service quality that are truly felt by the people? At Jalan Batu Nilam 4, Bandar Bukit Tinggi, there are reports of missing and incomplete drain covers on the pedestrian walkway. In Bandar Parklands, residents have complained about a public park that is not maintained, uneven pedestrian walkways, and trees that are not pruned.
What is the point of building a modern city if residents still have to walk on the road because pedestrian paths are unsafe, blocked or disconnected? I ask KPKT to ensure that public facility development includes a network of safe, disabled-friendly pedestrian paths that connect residential areas with schools, business centres and public transport. Mr Chairman, Klang is increasingly seeing proposals for high-rise apartments and condominiums, while existing green areas and infrastructure are under growing strain. In Bandar Parklands, residents once objected to a proposal for five blocks of service apartments because they feared the additional density would burden existing roads and facilities. What is more worrying is that development replacing green areas with concrete surfaces can increase stormwater flow into drainage systems. If drainage capacity is not upgraded in step with development, the risk of flash floods may also increase. We have seen repeated flooding in areas such as Taman Bayu Perdana, Bukit Raja, Taman Sentosa, Bandar Baru Klang and Sungai Rasau. I want to ask: before high-density development is approved, do the authorities actually assess drainage system capacity, flood risk, traffic congestion, community facilities and the green areas that are needed? Is every project required to provide an adequate stormwater management system, and is compliance monitored after development is completed? Let us not approve new development today only to have to spend millions of ringgit later solving flood problems made worse by unplanned development in the future. More importantly, are the houses being built truly meeting the needs of the people and the buying capacity of purchasers? Are we approving development based on need or on greed for profit? In simple terms, are we building houses based on the need or greed? I ask KPKT to explain whether data on unsold houses, house prices compared with household income, and actual demand in Klang are used in the assessment of housing development. Another serious problem is complaints about land allocated for specific purposes but allegedly used for other activities. Among these are industrially zoned land used for agricultural activities, and land reserved for education but used or leased for commercial purposes.
For example, on 19 October 2026, the Office of the Member of Parliament for Klang lodged a formal complaint with MBDK regarding allegations of misuse of WTC Company land near Jalan Pendamar and Jalan Banting. Mr Chairman, just one minute...
Silakan.
The land allocated for mixed development is believed to have been used as a temporary settlement and buffalo trading area for several years. What is more worrying is that the animals were reportedly roaming the roads at night, endangering the safety of residents and road users. In April 2024, MBDK took action against 16 premises operating without permission on school reserve land in Jalan Langat, Bandar Botanik. How can misuse of land like this continue for so long before action is taken? Where is the monitoring by the local authority? I urge KPKT to take a firmer approach through coordination with the Selangor State Government, the land office and MBDK to tighten monitoring, speed up investigations, and ensure appropriate action against parties proven to have breached land use conditions. I also ask KPKT to state the number of complaints about land misuse in Klang over the last three years, the number of cases investigated and the enforcement actions that have been taken. Urban planning cannot simply look good on paper while land misuse continues and the safety of the people is put at risk. Mr Chairman, Klang does not simply need more development. Klang needs better urban planning, public facilities that function, balanced housing development, well-preserved green areas and effective land use enforcement. I urge KPKT to strengthen monitoring of MBDK and coordination with the Selangor State Government, particularly so that development approvals take comprehensive account of infrastructure capacity and flood risk. Real development is not when buildings grow taller, but when the quality of life of the people also improves. Let Klang not be developed only in name and in the appearance of its buildings while lagging behind in comfort, safety and the well-being of its residents. I hope the Minister can respond to these matters. Thank you, Dato' Pengerusi.
Thank you, the Honourable Member for Klang. Please proceed, the Honourable Member for Rompin.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, and greetings of peace.
Waalaikumussalam.
Thank you, the Honourable Member, Dato' Pengerusi. The Ministry of Housing and Local Government (KPKT) carries the responsibility closest to the daily lives of the people, including protecting lives and property through the Fire and Rescue Department of Malaysia (JBPM) and the issue of public housing. I will touch on only two items. First, Item 30000 – Construction of JBPM Buildings in Peninsular Malaysia, with an allocation of RM67,100,000. Dato' Pengerusi, the Fire and Rescue Department of Malaysia currently operates 344 fire stations nationwide, and another 15 are under construction. On 29 June 2026, the Director-General of JBPM informed that the department had identified the need for 81 more new fire stations based on fire risk analysis for every area of 100 square kilometres. However, of those 81, only four are proposed under the Second Rolling Plan of the Thirteenth Malaysia Plan (RMK13), while the remaining 77 remain on the priority list subject to financial capacity. JBPM also has approximately 1,900 vacant posts. The Government often cites a national average response time of 8.45 minutes in 2024, which is better than the target of 10 minutes, but the national average conceals rural gaps. The Government's own estimates book on pages 424 and 425 only targets answering 66 per cent of emergency calls within 10 minutes in 2027. This means that one in every three calls is expected to take longer. Most of this occurs in my constituency, Rompin. Dato' Pengerusi, the large Rompin District has only three fire stations: Kuala Rompin, Muadzam Shah and Pulau Tioman. Keratong Mukim alone is home to 42,951 residents based on the 2020 Census. It covers ten FELDA land schemes within the Keratong and Perantau Damai clusters. The Federal Route FT12 that crosses it recorded 392 accidents in 2023. Firefighters not only put out fires, but also rescue victims trapped in vehicles. In early October 2026, a fire broke out in a house at Felda Keratong 4. The Honourable State Assemblyman (ADUN) for Bukit Ibam, YB Ustaz Nazri, stressed that the nearest fire station is located in Muadzam Shah. He then urged that a station be established in Keratong. Dato' Pengerusi, in a fire, every minute determines whether a house can be saved or is left as ashes. My question to the Honourable Minister,
is Keratong included in the list of the 81 fire stations identified? If not, I humbly ask that Keratong be given priority in the Rolling Plan of RMK13 based on its population, the distribution of FELDA settlements and the accident risk on FT12.
I also request that the station to be built under Item 30000 in 2027 be listed, and that it be stated whether the allocation under Item 35000 can be used to identify a site in Keratong. I also ask that the actual response time data for emergency calls from Keratong Mukim be disclosed as soon as a decision is made, based on data and not the national average. Dato' Pengerusi, I now move to the second item, namely Owned Housing Project – 01513, under the National Housing Policy and the urban planning framework led by the Ministry of Housing and Local Government. The Government emphasises the principle that every new housing development must comply with sustainable and safe planning standards and be equipped with complete basic infrastructure before being handed over to the people. However, the main challenge at the implementation level is when new housing sites in outskirts areas are not coordinated with the capacity of public infrastructure overseen by local authorities. This reality can be seen directly in housing development areas around Bandar Muadzam Shah in the Rompin Parliamentary constituency, particularly in the Desa Cempaka 2 housing area. For the information of the Honourable Minister, the basic infrastructure provision project for Desa Cempaka 2 was actually tendered by Rompin District Council in 2018. However, the project was cancelled following the change of government administration at the time. The cancellation has left a direct and very burdensome impact on the people, in that landowners in the area continue to be prevented from building their own homes due to the absence of basic infrastructure. So my question is, what is the current status of Desa Cempaka 2 and when will new allocations be disbursed to ensure the rights of these landowners are protected? So, I request the Honourable Minister to restore the allocation that was given in 2018. Thank you.
Thank you, the Honourable Member for Rompin. Also, Honourable Members, on this occasion I am pleased to welcome visitors from— and from the students of Sekolah Menengah Kebangsaan Kota Kuala Muda, Kedah [Applause] together with the teachers who are now in the Public Gallery.
Welcome to the Malaysian Parliament. I hope today's visit provides benefit and a deeper understanding of the proceedings of the Dewan Rakyat. Forgive me, I could not join you for lunch earlier as I was attending to students from Kuala Lumpur in the Special Chamber. Next, I invite the Honourable Member for Sri Aman.
Thank you, Mr Chairman. Sri Aman only wishes to touch on one item, Mr Chairman, namely Item 030100 concerning Fire and Rescue under the Sustainable Urban Community head. Under this item, Sri Aman notes that an allocation totalling RM1,138,411,300 has been provided for the year 2027. Accordingly, Sri Aman requests that a fire and rescue station be built in the Pantu area under the Pantu district to meet the increasingly urgent safety and emergency needs of the local community. This need is extremely critical given that the Pantu area has a population of nearly 14,000 people, Mr Chairman, spread across 210 villages or Rumah Panjang. Meanwhile, the existing fire station in Sri Aman is located approximately 72 kilometres from the area concerned. This long distance has the potential to cause delays in emergency response times, particularly in fire incidents and rescue operations that require immediate action. Furthermore, Mr Chairman, the road connectivity in several areas is still very unsatisfactory. Although it looks close on the map, the reality is very challenging, and this may thus affect the smooth movement of fire teams to the scene of incidents. Therefore, the long distance and constraints in road infrastructure are challenges that need to be addressed to ensure emergency assistance can be delivered more quickly and effectively. Hence, the construction of a Fire and Rescue Station in the Pantu district is not merely a necessity, Mr Chairman. It is not just an infrastructure need but is an important investment in protecting the safety and well-being of the people. This facility will help accelerate emergency response, reduce the risk of loss of life and property damage, and increase the level of preparedness to face fires and disasters under— in the Pantu area and the surrounding villages. Accordingly, the Federal Government, particularly the Ministry of Housing and Local Government and the Fire and Rescue Department of Malaysia, is requested to give due consideration and take follow-up action on the proposal
for the construction of a Fire and Rescue Station in the district or in the Pantu area to meet the increasingly urgent safety and emergency needs of the local community. Mr Chairman, this need is extremely critical. It is extremely critical because the Pantu area has a population of nearly 14,000 people, comprising 210 longhouses or villages. Meanwhile, the existing fire station in Sri Aman is located approximately 71 kilometres from the area concerned. This long distance has the potential to cause delays in emergency response times, particularly in fire incidents and rescue operations that require immediate action. Furthermore, Mr Chairman, road connectivity in several areas remains unsatisfactory, as I said earlier. Therefore, the long distance and constraints in road infrastructure are challenges that need to be addressed to ensure emergency assistance can be delivered more quickly and effectively. Accordingly, the Federal Government, particularly the Ministry of Housing and Local Government and the Fire and Rescue Department of Malaysia, is requested to give due consideration. Thus, Mr Speaker, Sri Aman requests support. Thank you.
Thank you, the Honourable Member for Sri Aman. Next, the Honourable Member for Parit is invited.
Peace be upon you and the mercy and blessings of Allah, and good afternoon.
Waalaikumussalam.
Thank you, Dato' Pengerusi. The total estimated expenditure of KPKT for 2027 is RM6.355 billion, an increase of RM266 million or 4.4 per cent from RM6.088 billion in 2026. Referring to Item 00100 – Small Projects in Local Authority Areas, 040300 – Rate Assistance Contribution (SMK), 020100 – Local Government. Seri Iskandar is the administrative centre of Perak Tengah district, and is also a city of knowledge, rapidly developing, with UTP, UiTM, the MARA Professional College, IKBN, MARA vocational colleges and many schools, as well as factories and government offices. Unfortunately, Seri Iskandar still does not have a public market. The population according to the 2020 census was 14,827, but the latest figure shows that Seri Iskandar's population has already reached more than 35,000. However, there is still no public market in Seri Iskandar. For the information of the House, residents today buy household necessities, fish, vegetables
and so on from scattered shops, which causes pollution and so on. So, we need a comfortable, clean, orderly and modern public market so that small traders have a legal trading site and local residents obtain fresh supplies at reasonable prices. My question: is the ministry prepared to approve the construction of a public market in Seri Iskandar under project 00100? Second, how much was allocated under 00100 and the Rate Assistance Contribution (SMK) for Perak Tengah District Council in 2025, '26 and '27? Given that the actual expenditure for 2025 was only RM29 million compared with the 2026 allocation of RM447.23 million, what assurance is there that the RM689 million allocation in 2027 can be fully spent and how will it be distributed between states and local authorities?
Fourth, what are the standard and average cost of constructing a public market, and is KPKT prepared to assist with a feasibility study for Seri Iskandar through PLANMalaysia? Second, the question I wish to raise refers to 00100 - Small Projects in Local Authority Areas, 040300 - Rate Assistance Contribution (SMK) and 020100 - Local Government. Dato' Pengerusi, the residents of Seri Iskandar are already tired of reporting various cases of potholed and damaged roads that take far too long to repair. Potholes left for months are not merely an inconvenience, but also invite accidents, damage vehicles and undermine the confidence of investors who come because of the factories in the Seri Iskandar area. Often the people do not know where to complain: the local authority, the JKR or the state government. The local government allocation is RM69.8 million in 2027, an increase of 3.3 per cent. Meanwhile, the Rate Assistance Contribution (SMK) increases by RM60.87 million to RM480.87 million. My question: what is the standard period set by KPKT for local authorities to repair roads after complaints are received? And how does KPKT monitor district councils' compliance with that period? Second, how many complaints about damage in Seri Iskandar have been received and resolved since 2025, and what is the average number of days to resolve them? Third, regarding Dataran Sungai Seluang, Dato' Pengerusi. There is a 19-hectare area that has not yet been upgraded, with only a jogging or walking path. It is very suitable for upgrading with the addition of a children's playground
seating and shelter, public toilets, lights and so on, facilities for the disabled too, and stalls for small traders. My question: is KPKT prepared to consider Dataran Sungai Seluang as a public park development project in 2027? Fourth, regarding low-cost housing. Dato' Pengerusi, many young people from B40 and M40 in the Parit Parliamentary constituency still do not own their own homes. They work in Seri Iskandar, Ipoh and Bota, but housing prices are not in line with their incomes. They need low-cost and affordable housing built in nearby locations. My question: how many units of PPR, Rumah Mesra Rakyat and PR1MA are planned in the Parit Parliamentary constituency in 2027, and has a site been identified? Second, what is the quota for Rumah Mesra Rakyat SPNB for the state of Perak and in Perak Tengah District, and why was actual expenditure for 2025 recorded as zero? Third, is KPKT prepared to cooperate with the state government to provide land for low-cost and affordable housing in Seri Iskandar and Parit, since land is a state matter? Mr Chairman, that is all from me. Thank you.
Thank you, the Honourable Member for Parit. I now invite the Honourable Member for Betong.
Thank you, Dato' Seri Chairman. Peace be upon you. For the purposes of B and P.43 of KPKT, Betong would like to begin by addressing a specific issue relating to fire management and the readiness of fire and rescue assets in rural areas, particularly with reference to my constituency in the Betong Parliament. Dato' Sri Chairman, therefore, I go straight to Supply Item 030100 - Fire and Rescue, Development Item P.31000 - Procurement of Vehicles/Helicopters and Equipment for JBPM, and Item P.32000 - Maintenance of Buildings and Machinery of JBPM. Dato' Sri Chairman, one week ago, on 14 November, last Friday, a fire broke out at a traditional longhouse more than 80 years old at Matop, Paku, Spaoh, Betong, destroying 28 family units and causing loss of property. I happened to be in the area and immediately rushed to the fire site and witnessed with my own eyes the efforts of the Fire and Rescue Team to put out the fire.
Therefore, Dato' Sri Chairman, Betong would like to take this opportunity to record its thanks to the Fire and Rescue Department of Malaysia (JBPM), particularly Zone 3 Sarawak, namely the Betong Fire and Rescue Station Team, which was assisted by the Saratok Fire Station as well as the two Betong and Spaoh Volunteer Fire Brigades, which have tirelessly put their own safety at risk in the operation to extinguish the fire, which was extremely challenging. So, Dato' Sri Chairman, this sad incident is not merely a tragedy, but also reveals several weaknesses, challenges and constraints in terms of the firefighting asset capacity in rural areas such as longhouse areas. So, Dato' Sri Chairman, longhouses, whether modern or traditional, with their elongated and multi-storey form, really need more sophisticated or modern firefighting capability. So, accordingly, Betong would like to urge and request that KPKT give serious attention to the need to upgrade the capability of the Fire and Rescue Department in Sarawak. So, Dato' Sri Chairman, we must not continue to rely on conventional assets when the terrain, distances between settlements and the structure of longhouses as I mentioned earlier in Sarawak require a very different firefighting approach. It is not like in urban areas, where the area is flat, but in villages it is hilly. So, the challenges are indeed very different. Therefore, Betong urges that under the forthcoming budget, the government should provide specific allocations to supply modern fire engines with high ladders, or what we call aerial ladder platforms, high-pressure pumps and special equipment suited to the structure of longhouses in Sarawak. Betong is hopeful that the Betong Fire Station will receive additional assets under the procurement programme up to 2028. Because we cannot wait until more longhouses are destroyed or lives are lost before realising that existing assets are insufficient. So, Betong expects KPKT to view this need based on the geographical realities and local risks, not merely on the ordinary procurement formula. So, equip our firefighters with the technology, assets and facilities that are appropriate so that they are not only able to act swiftly but can also carry out their duties safely and effectively. The safety of our people in Sarawak must be given priority equal to that of people in other areas. Dato' Sri Chairman, at the same time, the Volunteer Fire Brigade (PBS) cannot continue to be expected to be on the front line without adequate equipment. I
understand that the budget for building a station does not have sufficient allocation. Therefore, what is wrong with strengthening these Volunteer Fire Brigades, giving them modern equipment such as high-pressure pumps, engines and so on so that they can help in these cases. Because I myself witnessed how the Volunteer Fire Brigade, within 10 hours of being in the area, helped our fire station to put out the fire, but they had constraints in terms of the assets used. So my question is, what specific allocation is there in the year 2027 to strengthen our Volunteer Fire Brigades by supplying them with high-pressure pumps, hoses and complete personal protective equipment (PPE) for these teams? Dato' Sri Chairman, finally...
Betong, Betong. Can Kluang interject briefly about the volunteer fire brigades?
If Dato' Sri Chairman permits.
Silakan, silakan.
Thank you, Mr Chairman. So just one additional view regarding the volunteer fire brigades, because I myself also—witnessed that the volunteer fire brigades indeed help in rural areas. So we must ensure that they receive special equipment, namely safe personal protective clothing, every year if they go out to serve the villagers, people in rural areas. If not—they are in fact placing themselves in a very dangerous situation, especially in rural areas. So, whether you agree or not, should we examine whether they receive an allocation every year, especially in rural areas? That's all. Thank you, Betong.
Thank you, Dato' Chairman. I strongly agree, and indeed in terms of allocation for building fire stations we do have constraints. So what is wrong with upgrading their assets in terms of what we mentioned earlier so that they can help, especially in rural areas. Finally, Dato' Sri Chairman, I have raised the condition of our firefighters' quarters in Betong in November 2025, following the allocation of RM15 million for the repair of JPM quarters nationwide. What were the results of the technical inspection in Betong and how many units have been repaired throughout 2026? If there is still damage, ensure that the repairs are completed in the year
2027. And, what are the additional needs that have been identified by the Betong Fire and Rescue Department from operations such as fighting peat fires, fires and so on. And I also want to know the actual performance of the fire station's emergency response time as well as the steps to expand service coverage to settlements far from the fire station. And please, Dato' Sri Chairman, do not wait until another major tragedy happens before assets are upgraded. The safety of our people in rural areas must be given the same priority. Because firefighters must be provided with sufficient assets. Volunteer fire brigades must be strengthened and the welfare facilities of personnel must also be looked after. That is all, I humbly ask for support. Thank you.
Thank you, the Honourable Member. Please, the Honourable Member for Pendang.
In the name of Allah, the Most Compassionate, the Most Merciful. Peace, mercy and blessings of Allah be upon you.
Waalaikumussalam.
[Reciting prayer] Thank you, Dato' Sri Chairman, for permitting me to debate the matters I refer to, namely B.43 and P.43, which I see have increased from 2026 to 2027, rising to RM6.36 billion for local authorities, for this KPKT. So I also want to refer to Item 010000 – Small Project Estimates in Local Authority Areas, which increased from RM447.23 million in the revised estimate for 2026 to RM689.06 million, an increase of RM241 million. Dato' Chairman, I want to touch a little more on rural development, including the rights of the Orang Asli. The houses of the Orang Asli at present, in vast areas, the government should focus on them, they are scattered. If we gather them, just as we built the Kampung Baru Cina housing estates in the past to control communist influence. So likewise we need to do this for the Orang Asli, who live in very large areas and are left neglected, but when we gather them to build integrated housing for them, it is easier to provide assistance and so on. So I hope the government will pay attention to Orang Asli housing, as their large areas have been encroached upon by national development at this time. So we must also look after their welfare. Do not just think about making profits. This is what I raised, Dato' Sri Chairman. So, coincidentally, Dato' Chairman represents Cameron Highlands. So, I am speaking today, no need to go there. [Laughter]
True, this is what we must say. Whatever we joke about, we must still raise their rights. So for that reason, Dato' Chairman, in the area— we see now that for residents, the impact can be seen in the facilities they use every day. Hawkers want comfortable stalls to trade in, market visitors want public toilets that work, families want safe playgrounds for their children, including Orang Asli. Don't think that only urban areas have rights, they too have rights. So, local authorities need to provide facilities that need to be repaired. That is why the views of local authorities must be taken into account when projects are to be developed or selected. We must take into account all the matters I mentioned earlier. Although the rights of the Orang Asli must definitely be taken into account, if development is to be carried out, such as logging and so on for profit, their rights must be protected. Their children need to grow up. However, the estimate document tabled does not show what each state and each local authority will receive. When this breakdown is absent, it is difficult for the House to assess whether the distribution takes into account the population, the condition of existing facilities and the actual needs in each district. So Dato' Sri Chairman, Pendang wants to know from the RM689.06 million, how much is allocated to Kedah and how much to the Pendang District Council, which is my area, and what criteria are used to select projects? Pendang also requests the ministry's permission to publish a list of approved projects by local authority together with their value and implementation status. If projects have been approved, residents should be able to check when work will begin and when the facilities can be used. In planning permission, Dato' Sri Chairman, we have criteria for it. So why can we not also apply these planning permission conditions to the development of Orang Asli, the development of Orang Asli housing. We do it just like housing estates and so on. They have the same rights as Malaysian citizens. So we must think in the same way. So I criticise, I give a view that the Ministers who are in charge of all these developments, housing and so on, should look at these people equally, including those in my interior area, my area is the interior, Dato' Sri Chairman. Pendang, although it is interior, is a paddy area. So, people are still in the old style. [Laughter] So for that reason, we see the example of PPR Kampung Selagon in Beaufort, Sabah, a project worth RM23.7 million in 2017. According to audit findings referred to in the committee's kit, all 67 units remain unoccupied as of July 2026 due to ground movement problems. Almost nine years after the project was completed, the houses still have not benefited the families who were supposed to occupy them.
So Pendang wants an explanation on what basis the repair allocation has been reduced, and with this RM6.5 million, how many projects and how many housing units are targeted for repair in 2027? A little more, Dato' Yang di-Pertua. At the same time, under Item 30,000 – 30000, for Maintenance of Buildings and Machinery, the Fire and Rescue Department of Malaysia (JBPM) increased from RM15.06 million to RM106.25 million, which is an additional RM91 million. That is quite a large amount. So we hope this matter can be seen in that machinery that frequently breaks down, maintenance can help ensure that more fire engines are available to rescue people, and the time taken under 10 minutes when a fire occurs and so on. How many of these under-10-minute responses, according to the existing conditions, can be carried out by the fire department? Lastly, regarding So Pendang wants to ask the ministry to present the actual performance of response time, the number of engines in operation and the distribution of maintenance allocation by district when an emergency occurs, with the target of 10, below ten minutes, below 10 minutes, specifically to improve coverage in mukims far from fire stations, including in this Pendang district. Mr Speaker, Pendang requests an answer that this august House can verify. How much for Pendang? When can these houses be occupied and how long must residents wait for the fire brigade to arrive? So, that is all, thank you Dato' Sri Chairman. Today we share the same experience, the same problems faced by our people. God willing, I hope the KPKT ministry can give attention to what has been raised. With Allah's guidance and grace. Peace, mercy and blessings of Allah be upon you.
Thank you, Pendang. If the Honourable Member speaks about the interests of the people, I will give extra time. [Applause]
The floor is given to the Honourable Member for Ampang.
Thank you, Honourable Member Dato' Dr. Chairman. In the name of Allah, the Most Compassionate, the Most Merciful. Peace, mercy and blessings of Allah be upon you, and greetings of peace. Ampang only wishes to touch on two matters, namely under Item 02100 – Local Government, Item 020400 and one other which I will read out. The matter I wish to raise is under urban and rural planning. What I have found, because there has been a great deal of development entering Ampang recently, is that there is a lack of uniformity in ensuring that these local plans are established. What I have found is that local plans do not exist everywhere in our country. Perhaps in the towns of Selangor they exist, but not everywhere. So, my question is, when, and how many local authorities do not have them, and when will this be established? As my friends mentioned earlier, when local plans are absent, we have no document to refer to. Development proceeds however it likes. So, it is important, especially in rural areas, that a specific local plan be established. For example, in Ampang Jaya, we have one up to 2035, the plan already exists. So, I want to ask about that matter. Secondly, when will KPKT introduce a national SOP at the same time so that standards are the same? I see that in Selangor, each local authority has a different SOP. For example, if we talk about erecting signboards, Ampang Jaya is different, Shah Alam is different and so on. I hope there will be one uniformity so that it does not conflict. And thirdly, does KPKT intend to establish a national digital planning observatory, with your permission. What I mean is, ordinary members of the public sometimes wonder, ask what is to be done, what existing plans there are, what direction the place where they live and its surroundings is taking, but they do not have a specific reference. So for that, I propose that there be a national digital planning system to ensure that the public can view it thoroughly, directly. Just open the Internet and you can look, oh, what is the planning next to it and so on. If there are changes to planning, they must also be notified, and we ordinary people can refer to those matters. And what is important, because I see in recent times, in Ampang there is so much planning entering, up to RTMPAJ 2035, that has been given a lifeline by the court, namely a high court decision at the Shah Alam High Court for 12 who challenged it to be reheard. So, this should not really happen if the public hearing process is done properly. Furthermore, under this item too, I want to propose that the social impact assessments that we always ask to be carried out when a planning is made be reviewed. For example, in normal circumstances, we take social impact for a location involving 2,000 residents or housing units, okay. But in places like Ampang, which are on slope edges, disaster areas, 2,000 is simply impossible to achieve. So, many of these areas are neglected by SIA. So, that is where I want to propose that KPKT look at ensuring that SIA is not the same for everyone. There are certain locations, perhaps their terms of reference
...in Ampang. I found that there is a lack of uniformity in ensuring that these local plans are established. What I found is that local plans do not exist everywhere in our country. Perhaps the cities in Selangor have them, but not all of them do. So my question is: when, and how many local authorities (PBT) do not have them, and when will this be established? As the friends mentioned earlier, when local plans do not exist, we have no single document to refer to. Development is simply carried out however people like. So it is important, especially in rural areas, that a specific local plan be established. For example, in Ampang Jaya, we have one up to 2035, and the planning is already in place. So I want to ask about that. Secondly, when will the Ministry of Housing and Local Government (KPKT) introduce a national SOP at the same time, so that the standards are the same? I see that in Selangor, each PBT has a different SOP. For example, for raising signboards, Ampang Jaya is different, Shah Alam is different, and so on. I hope there can be one uniformity so that it does not conflict. And thirdly, does KPKT intend to establish a national digital planning observatory, with permission? What I mean is, members of the public sometimes wonder, ask what is to be done, what existing planning there is, what the direction is for the place where they live and its surroundings, but they do not have a special reference. So for that purpose, I propose that there be a national digital planning system so that the public can view it thoroughly and directly. Just open the Internet and you can look, oh, what is the planning next to it and so on. If there are changes to the planning, these should also be notified, and we, the public, can refer to them. And what is important, because I have noticed recently, I have seen in Ampang a great many plans going through, to the point that RTMPAJ 2035 has been given leave by the court, that is, a High Court decision at the Shah Alam High Court, for 12 who challenged it to be reheard. So, this should not really happen if the public hearing process is indeed carried out properly. Furthermore, under this item too, I would like to propose that the social impact assessments that we always request whenever a planning is made be reviewed. For example, under normal circumstances, we take the social impact on a location involving 2,000 residents or housing units, okay. But for places like Ampang that are along slopes or disaster areas, 2,000 is simply impossible to achieve. So, many of these areas are neglected in SIA. So, that is where I want to propose that KPKT look at whether this SIA should not be the same for everyone. There are certain locations, perhaps their terms of reference...
enough for 200 housing units to undergo SIA, for example in certain areas. That is among the last points under this topic, because Ampang is a disaster-risk zone. In fact, a study has already been carried out on the status of locations in Ampang that need attention. I request that this be published if possible so that it can be read and seen by all residents around the Ampang Parliamentary constituency or areas related to Ampang, such as Gombak and also the outskirts of Hulu Langat, so that we know the status of disaster conditions in our area. That is under the first topic. The second topic, Dato' Chairman, I wish to say here under Item 00900 – Studies by the Ministry of Housing and Local Government (KPKT), under Item 030600 – Housing Planning. I want to draw attention to housing projects that we may have overlooked. If housing is now built in multiple storeys, built on a slope area, and when the housing is built, that plot. For example, we have a housing project called Horizon Rimba 27. Its— the plot is 64 acres, but only a small portion, four acres, is to be developed. Surrounding it are Category III and IV slopes. I think Cameron Highlands also has many slopes like that. So, this developer is rather clever. He develops the housing and the slope is stabilised now, but after the buyers purchase, he will hand over the house slope and those slopes together to the buyers. So, what is the question here? We actually do not have a policy. Buyers now living in these strata houses face management and maintenance problems. So, say several hundred housing units or thousands developed there later, the one who bears the cost of maintaining the slope is the buyer. Having built it, the buyer bears the cost. After it is built and completed, the slope is also borne by them. So, I want to ask the KPKT. Is there a new model we need to look at on this matter? If possible, I propose that we have a method whereby we separate the housing from it. Yes, there is, but the cost and also the maintenance remain under the developer, or perhaps other levies need to be considered to move in that direction. Why? It is unfair. They have already bought with the cost of rectifying the dangerous slope beside it, but after that, when it has been bought, everything is handed over to the buyers. So, there is truly no capacity. Are we really going to take maintenance up to RM3,000, RM4,000 a month to ensure slope stabilisation takes place at all times? So, that is one of the matters I want to raise. I hope this matter is given attention. Thank you, Dato' Chairman, the Honourable Member.
Thank you, the Honourable Member for Ampang. Next, I invite the Honourable Member for Temerloh.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Dato' Dr. Mr Chairman. Item 020100 – Local Government, MyKiosk Project. Temerloh wishes to raise the issue of MyKiosks, specifically those at Taman Sri Layang, Taman Chengal, around the Employees Provident Fund (KWSP) building in Temerloh and across the country, which were built by local authorities but ultimately left abandoned without tenants and without business activity. The MyKiosk project uses public money with the aim of helping small traders and micro-entrepreneurs. However, when these facilities are not utilised, they become a waste of public assets. The allocation cost RM150 million. Which company won the tender for MyKiosks nationwide? Temerloh would like to ask, how many MyKiosks in Temerloh specifically and across the country are still empty and abandoned? Does the ministry have a database that records the usage rate of kiosks? What actions has the ministry taken to revive these kiosks, including offering subsidised rentals to small traders, women entrepreneurs and the B40 group? What is the total income from kiosk rentals that has been successfully collected and reported? Temerloh proposes that the ministry carry out an audit of the use of local authority assets before approving the construction of new MyKiosks. Dato' Dr. Mr Chairman, misuse of business premises licences. Temerloh has received complaints about the misuse of business premises licences. There are premises registered as business shops or computer shops but which secretly run gambling activities. This business activity is spreading rapidly and is widespread in Temerloh. To what extent are monitoring and enforcement by the local authorities, in cooperation with the Royal Malaysia Police (PDRM)? There are illegal gambling centres operating openly under the cover of telecommunications shops and employing Muslim women workers. I urge the local authorities to take up this responsibility. The problem of flash floods. Residents of the housing area of Taman Rimba, Mentakab, namely Jalan Selasih, Jalan Nipah, Jalan Mengkudu and Jalan Inai, are always worried whenever heavy rain falls because it can cause flash floods. Residents have long endured this problem and made complaints, but it has still not been resolved. Likewise, the flash floods faced by residents of Perumahan Makmur, Paya Jejawi, Temerloh, because every time heavy rain falls, they have to face flash flood problems. When will this problem be resolved?
Fourthly, land subsidence at TJ 6, Temerloh Jaya 6. Since 2021, the back road has cracked more and more seriously, even with potholes, causing concern for the safety of 12 resident households there. At Taman Pulai Idaman, Temerloh, land subsidence endangers the house occupants, and still there is— there is still no action even though complaints were made several months ago.
Parking issue. Temerloh has received complaints about the difficulty of finding parking around Bandar Temerloh because nearly 90 per cent of parking bays are marked yellow. As a result, it is difficult to shop and buy at the shops, and in the end the traders have no customers because they buy online. The time has come for multi-storey parking to be built in Temerloh for everyone's convenience. The problem of stray dogs roaming in parks and housing estates, such as Taman Temerloh Makmur, in Taman Temerloh Jaya and surrounding areas, threatens residents' safety. To what extent have the local authorities acted after receiving complaints from residents about this issue? Next, Dato' Dr. Mr Chairman, Item 020400 – Urban and Rural Planning. I take note of the increase in allocation from RM66 million to RM68 million. However, my question is, to what extent does this increase affect the quality of urban and rural planning? We see new housing development taking place rapidly and drastically, but public facilities such as schools, clinics, roads, drainage systems, stormwater drains, clean water distribution and traffic flow sometimes do not grow in line with population growth. A clear example is the development of more than 10 housing estates along Jalan Maran, Temerloh, within less than five years, causing side effects. Ultimately, residents face traffic congestion, a shortage of basic facilities, clean water supply problems and overcrowded schools such as Sekolah Kebangsaan Paya Pulai. I would like to ask the Minister, what is the mechanism of PLANMalaysia to ensure that new housing developments are accompanied by adequate public facilities and basic needs? Does the ministry have a development impact assessment of flood risk and drainage system capacity before a project is approved? How will PLANMalaysia ensure that the development of small towns and rural areas does not continue to be neglected compared with major cities?
020500 – Urban Sustainability. What are the minimum standards set by the KPKT for local authorities to ensure that pedestrian routes are safe, continuous and friendly to persons with disabilities (OKU), especially in town centres and school areas? Can the KPKT introduce pedestrian route audits involving OKU, senior citizens and users of baby strollers so that the facilities built can truly be used by the people? Does the ministry have a specific policy to develop elderly-friendly and OKU-friendly cities, taking into account that our country is moving towards an ageing society? 030200 – National Housing. As of 30 June 2026, there are 303 ailing housing projects and 100 abandoned projects in Peninsular Malaysia involving 14,961 buyers. The question is— what is the KPKT's annual target for rehabilitating abandoned projects, and what protection is there for buyers who have paid their loans but whose houses are not yet completed? 030300 – Community Credit Control. I urge the KPKT to investigate loan shark activities that hide behind licences for money lenders. Complaints from victims have been received, and I seek assistance from Members of Parliament to settle loans from loan sharks. What is the KPKT's enforcement mechanism to ensure that licensed community credit companies do not take advantage of the B40 group who desperately seek loans, until they are finally trapped in debt and financial burdens? Temerloh also wishes to know the status of the fire station (balai bomba) in Lanchang for the needs of the surrounding community, since it is far from Bandar Temerloh. Has it been approved, and when will it be built, or what is the solution? Finally, Temerloh wishes to express its regret that citizens' complaints cannot be resolved and conveyed directly to the relevant agencies and departments, because opposition Members of Parliament and State Assemblypersons (ADUN) are not invited to the District Development Action Committee Meeting to convey all the complaints and problems of the people in the Temerloh Parliamentary constituency. Thank you, Dr.
Thank you, the Honourable Member. I invite the Honourable Member for Kapar to extend a welcome.
Thank you, Deputy Speaker. I wish to welcome the Parent-Teacher Association (PIBG) Committee Members of Sekolah Kebangsaan Rantau Panjang, Kapar, among the most overcrowded schools in Malaysia, and which I often mention, namely SK Telok Kapas. [Applause] These are the people who have suffered all this time. Thank you, Speaker.
Next, I invite the Honourable Member for Bakri.
Thank you, Dato' Sri Dr. Chairman. I refer to P.43, Item 30000 – Construction of Fire and Rescue Department of Malaysia (JBPM) Buildings in Peninsular Malaysia. I wish to raise again an issue regarding the need to build a Grade A fire station at Muar Furniture Park, which I raised in March 2023 and again last year in October 2025. But until now, there has been no positive response from the ministry. Dato' Sri Dr. Chairman, the development of Muar Furniture Park, covering approximately 400 hectares and involving investments worth billions of Ringgit, is targeted to become the largest furniture industry hub in the Southeast Asian region. However, industrial development must be accompanied by adequate safety facilities. In the present case, the safety facility in question is a Grade A fire station. The furniture industry uses wood and highly flammable raw materials in large quantities. A single fire can destroy not only the entire factory but also risk spreading to surrounding factories, causing losses of tens of millions of Ringgit, besides threatening the lives of workers and their families' livelihoods. Therefore, a fire station at Muar Furniture Park is very important to ensure that personnel and equipment can arrive in the shortest possible time before the fire spreads to the entire premises or to nearby factories. This need must be planned alongside the development of the industrial park. In my previous debate, I referred to the draft Muar District Local Plan 2030, which proposed a fire station covering 2.3 acres with at least two bay engines and an estimated cost of RM30 million. This proposal was placed in the implementation phase of 2021 to 2025. That period has ended and passed. What is the current status of this project? Has the site been finalised and land matters resolved, and most importantly, has the allocation been approved? What obstacles caused this proposal to take such a long time to implement? Until now, there is not even a sign of it. With an allocation of RM67.1 million under Item 30000 for 2027, is the Muar Furniture Park Fire Station on the list for next year? I request that the KPKT provide a clear schedule for tenders, the commencement of construction and completion of the project, and explain temporary protection measures for factories that are already operating in Muar Furniture Park.
Dato' Sri Dr. Chairman, I also refer to P.43 Item 00100 – Small Projects in Local Authority Areas. I wish to raise the need to upgrade the Bentayan Bus Terminal in Bandar Muar. The condition of the terminal is now increasingly dilapidated, including pillars that have cracked, exposing the cement inside, and iron seats that are rusting. The ticketing system and ticket counters are poorly managed, the terminal space is cramped, the facilities are old, there are none, none. Not that they are broken or anything, there are no toilet facilities, no shelter or covered walkway when boarding buses, especially on rainy days and so on. These are among the problems also raised by users and bus passengers.
Cracked pillars require technical inspection to determine their safety, damaged seats and limited waiting space affect passenger comfort, especially for senior citizens, families with young children and OKU users. What repairs have been carried out and what work is still needed? Dato' Sri Dr. Chairman, the RTD Muar 2030 Planning Document proposes an integrated public transport terminal in the new administrative area of the Muar Municipal Council in the 2026 to 2030 phase. However, I somewhat disagree if the implementation of this proposal means that the Bentayan Bus Terminal is moved out of the town centre. The Bentayan Bus Terminal brings passengers directly to the town near shops, markets and food stalls. Their presence has helped revive local economic activity. If this terminal is moved out of the town centre, it will divert customer flow away from the town and affect small traders who depend on the movement of people. We must take seriously the risk that the Muar Town Centre will increasingly disappear. Public transport should also facilitate people— to reach centres of economic activity. Relocation to a location far from the town centre may force passengers to add journeys and bear additional fares to re-enter the town. Therefore, my position is that the Bentayan Bus Terminal should be retained at its existing location and upgraded as soon as possible. The congestion problem that is often mentioned can actually be addressed through bus traffic management, including more orderly pick-up and drop-off areas and parking enforcement. Has the KPKT received an application from the Muar Municipal Council to upgrade this bus terminal? Can the ministry, through the Local Government Department (JKT), consider assistance and allocations for building safety, seating, toilets, covered waiting areas and OKU-friendly walkways?
Item 030600 – Housing Planning. On 20 November last year, I proposed in this honourable House that the resale of affordable housing be handled through a government agency. Today, I want to obtain the ministry's position and follow-up action on this proposal of mine. Land suitable for housing, especially land close to employment, public transport and basic facilities, is not easy to replace. Providing new houses requires land, infrastructure, financing and construction costs. Therefore, houses created through government land subsidies or development incentives must continue to benefit the target group after changing hands. When subsidised houses are eventually sold at market prices, low-income families who may subsequently no longer be able to afford them will need the government to provide new resources to help those families. The government would then have to bear the cost of adding new supply. Yet houses that have been assisted are allowed to exit the affordable supply after the moratorium ends. When house prices rise faster than incomes, the subsidy needed to help families will also increase. Recovering the original subsidy at the time of sale may also not be sufficient to buy an equivalent house in the future. Therefore, the retention subsidy approach maintains the benefit of assistance in...
Honourable Member. Honourable Member, I have already given you an extra four minutes, please wrap up.
Just wrap up. I will bring this issue to perhaps the next platform. That is all. Thank you, Mr Chairman.
Alright, thank you. Next, I invite the Honourable Member for Kangar.
Terima kasih...
The Honourable Member for Kangar is swapping places with Langkawi, is that right?
I am swapping with Langkawi. Thank you, Langkawi. Excellent, Langkawi. Thank you, Dato' Seri Dr. Chairman. Assalamualaikum warahmatullahi wabarakatuh. I move to Item 030200 – National Housing, with an allocation of RM41 million. The main issue today
the ability of the people to own a home, especially young people, newly married couples and low-income groups. So, on average, house prices are always rising today, while incomes remain low. So the question is, is the National Housing Policy truly meeting the needs of the people, or are we focusing too much on the number of housing units built without regard to the buyers' ability to pay? So my questions are: how many affordable housing units have been built, completed and handed over to buyers in 2025 and 2026, particularly in Perlis State? How many housing projects are still abandoned, delayed in completion or facing problems with handover of keys? And what action is being taken against developers who fail to comply with construction schedules? Next, what is the target for affordable housing construction in Perlis in 2027, particularly in the Kangar Parliamentary constituency? Dato' Sri Dr. Chairman, Item 030500 – Community Welfare. This time I wish to speak on the Indian community in Perlis. The Indian community in Perlis. So, I would like to request funds to upgrade the Perlis Indian Association Hall. Is the Honourable Deputy Minister here? It is located near Perodua in the Kangar area. This hall is old, very old. The hall has even been eaten by termites. I went there myself and I have seen its structure, which looks rather dilapidated, waiting for the time to collapse, and this hall is constantly used by the Indian community in Kangar and in Perlis generally. So, I request the Ministry of Housing and Local Government (KPKT) to allocate funds to upgrade this hall, and a letter will follow later. I now move to Item 01906 – Regional Planning. So, in principle I support the government's efforts to strengthen regional planning or urban planning aimed at stimulating the economy. So, national development should not be concentrated in dense areas such as the Klang Valley, as well as in developed cities. Small states such as Perlis also need clear planning so that the economy can be stimulated. So, my question to the Honourable Deputy Minister is, what are the ministry's efforts to develop Pekan Kuala Perlis as the state's seafood centre? So, Pekan Kuala Perlis has great potential to become a food port for the growing domestic tourists. So, if possible, we want a clearer plan by KPKT to elevate Kuala Perlis as the best seafood food port. And efforts can also be made to develop the Sungai Batu Pahat recreational area as a sports activity centre, especially outdoor sports. Camping sites can be provided to give city tourists the experience of enjoying the peace of the jungle. A jogging track can be built here, and a paid football field can also be built.
So with these activities, regional planning in the Sungai Batu Pahat area can grow into a sports centre and has the potential to develop the local economy.
Dato' Sri Dr. Chairman, I go to Items 020200 together with 020300 – National Solid Waste Management, Solid Waste Management and Public Cleansing Corporation (SWCorp). So, solid waste management is one of the important issues for KPKT as it involves cleanliness, the environment, public health and environmental sustainability. So, the question is that the amount of household and commercial solid waste is increasing. Everything depends on the waste disposal sites. We want to throw rubbish, everyone wants to go to the rubbish dump. So, waste disposal sites have limited capacity. If there is no alternative management, we will continue to face the problem of finding new areas for waste disposal. Next, regarding the issue of food waste. Food waste, where there is a very huge wastage. So, based on statistics, food composition is the largest component, followed by plastic and paper. This shows that solid waste is caused not only by population growth but also by a culture of food wastage. So my question is, does KPKT have a specific plan to address food waste in public markets and night markets. Night markets have a lot of rubbish, far too much, as well as in hotels or restaurants and so on? Does the government plan to expand the use of composting technology to reduce food waste sent to disposal sites? Nevertheless, finally I wish to congratulate MPK Perlis together with SWCorp, which has identified 104 centralised rubbish bin locations throughout Perlis despite one or two issues that have arisen. May Kangar city become a clean city today. Thank you.
Thank you, Honourable Member for Kangar. The following, the Honourable Member for Keningau, is invited. The Honourable Member for Keningau. If there is none, we move on to the next debater. [Interjected] Oh, please proceed, Honourable Member for Keningau.
Thank you, Dato' Yang di-Pertua. I go straight to Item 00400 – Smart City Construction, RM4.29 million. In Tambunan District, which is included in the Keningau Parliamentary constituency, a plan is under way to build Tambunan Smart City, with smart city characteristics, within an area
covering 5,000 acres. Keningau requests the ministry to assist the Tambunan District Office, together with the cooperation of the Parliamentary office, to draft and finalise the Tambunan Smart City Master Plan. Item 04000 – Urban Poverty Eradication, RM73 million. Keningau town is the largest town in the interior of Sabah with a rather high poverty rate. Sabah— Keningau wishes to ask, what programmes will be implemented for urban poverty eradication in Keningau town in 2027? Item 01513 – Owned People's Housing, RM370 million. How many units of this People's Housing Programme are allocated for Sabah for 2027? Keningau hopes the ministry can approve a new people's housing programme to be built in Keningau District. Item 40000 – Rumah Mesra Rakyat SPNB RM500 million. How many units of Rumah Mesra Rakyat (RMR) are allocated for Sabah in 2027, because every year Sabah does receive this allocation but it is far too small. This is because Sabah is a large area and most people live in rural areas and need the construction of RMR houses. Therefore Keningau requests that there be an allocation set aside for the Keningau area. Item 30002 – Construction of Malaysian Fire and Rescue Department Buildings in Sabah, RM4.38 million. For the construction of Fire and Rescue Department buildings in Sabah, this is indeed far too small, and this is due to Sabah's vast area and the fact that most residents live in rural areas, and house fires often occur in Sabah and sometimes take lives. Sabah needs many more fire stations to prevent and carry out rescue operations. Therefore Keningau also requests the construction of more fire stations in Sabah starting from 2027. Item 02101 – Public Park Development, RM51.6 million and also Item 02102 – Landscape Development, RM12.878 million. Keningau has separately applied for allocations to upgrade the Tukad Sinurambi Viewing Tower project in Tambunan and hopes the ministry will approve the softscape and hardscape landscape works for this Tukad Sinurambi project. Keningau also hopes the ministry will appoint Sabah contractors and change the method of awarding contracts practised by the previous administration, where after a contract is awarded it is sold to subcontractors and all the subcontractors do the work with a deduction of 15 to 25 per cent. So, I hope the ministry will appoint local contractors who are usually only subcontractors. Thank you.
Thank you, Honourable Member for Keningau. Now I invite the Honourable Member for Selayang.
Thank you, Dato' Speaker. Item 020200 – National Solid Waste Management. KPKT targets the construction of 18 waste-to-energy (WTE) incinerator plants. WTE requires modern technology and safe pollution control systems that comply with standards, conditions and best practices such as those in the European Union. Is the ministry ready with the budget and regulations for these international standards? One of the conditions that must be met is that combustion is only for suitable residual waste. EU waste policy prioritises prevention, reuse and recycling over energy recovery. Therefore, plants should receive residual waste after practical separation and recycling, not materials that can be recycled or food waste that can be prevented, composted or treated biologically. Second, the waste supply must be reliable and identified. Operators need to know which types of waste can be burned safely, including composition, moisture, value and calorific content, ash content and its hazardous properties. Malaysia needs to provide consistent separation, inspection and quality control so that the plant's feed material remains within its design limits.
[Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding
Third, permits based on BAT – Best Available Technology and emission limits equivalent to the EU. Every plant must have an integrated environmental permit that sets enforceable limits for air and water pollution. The permit must also require appropriate pollution control systems and cover abnormal operating conditions besides normal operation, and that BAT must be implemented. And fourth, effective control and monitoring of emissions. The plant must be equipped with a landfill gas cleaning system and monitoring designed for the maximum expected flow rates and concentrations of pollutants. Monitoring must cover related pollutants such as particulate matter, nitrogen oxides, sulphur dioxide, hydrogen chloride, mercury, dioxins and furans. Some emissions must be measured continuously, while others must be tested periodically. All results must be recorded so that regulatory officers can check compliance.
Fifth, safe management of ash, water, waste and treatment residues. The sixth, reliable operation and periodic maintenance. Operators must have procedures and trained staff to reduce avoidable start-up and shutdown processes, ensure pollution control systems operate within design, and monitor emissions during abnormal conditions. The seventh, independent monitoring and transparency to the public. Malaysia needs a regulator with staff, technical expertise and the power to inspect plants, verify monitoring data, investigate breaches and impose penalties. The public must also be able to access permit conditions, emission data and monitoring reports. Meaningful public consultation must be held during site selection and the approval process. Eighth, genuine energy recovery and financial viability. Plants must generate electricity or heat that is used efficiently, and have reasonable plans to use or sell that energy. The business evaluation must take into account the costs of construction and operation of pollution control, ash disposal, maintenance and decommissioning of the plant at the end of its lifespan. For Malaysia, the main test is whether the proposed plant can be supplied with sufficient residual waste after prevention, reuse and recycling efforts, while observing strict permit limits and the safe management of all by-products. Therefore, I support it. Thank you.
Thank you, Honourable Member for Selayang. I invite the Honourable Member for Kuala Krai.
Bismillahirrahmanirrahim. Thank you, Mr Chairman, for the opportunity given to Kuala Krai to raise issues in the debate at the Committee of Supply stage for the Ministry of Housing and Local Government. Kuala Krai refers to Item B.020100 – Local Government. I intend to voice the grief and anxiety of the people in the Kuala Krai Parliamentary constituency who have lost patience to the point that some have brought in Ultraman to build a new market using AI. It has been more than two years since 14 October 2024, when Kuala Krai Central Market burned down, destroying the livelihoods of hundreds of small traders who, to this day, operate only at a cramped and uncomfortable temporary site. What happened after that was not construction work starting, but rather the people being served a series of harmful bureaucratic comedies. Whereas,
before the market burned, I understand that the allocation to build a new market had been approved. I thought that once it burned, it would be built faster, but the KPKT instructed that a competition be held for designing an iconic market building plan. Boasting of modern design on paper, whereas the Kuala Krai Central Market burned down, but what has happened? The winner of the design competition was ultimately rejected on grounds of unreasonable technical reasons. Is this the way MADANI governance manages the fate of the people? The competition was held openly, but screening and negligence caused the idea to be discarded. The project to rebuild this market has been stalled for so long without any end in sight. Therefore, in the name of social justice and the suffering of Kuala Krai traders, I demand a candid and dated answer from the Honourable Minister. First, when exactly and concretely—what is the actual and concrete date and the black and white timeline on which the rebuilding project for the Kuala Krai Central Market can begin? Second, I understand there was an increase in the original allocation from RM15 million to RM17 million due to bureaucracy and the delay in decisions made for implementing this project. I suggest that this additional RM2 million be obtained from KPKT's additional budget and not be burdened on Kuala Krai District Council to find its own funds. Mr Chairman, I refer to B.030100 – Fire and Rescue. Based on the target response time of under 10 minutes, it has only been raised by one percentage point. One percentage point from 65 per cent to 66 per cent. This means that one in three emergency calls in this country still fails to be attended within 10 minutes. For the Kuala Krai Parliamentary constituency, the largest constituency in Kelantan, which covers interior areas such as Dabong, Laloh, Manek Urai and so on, with hilly terrain and high risk of major floods and road accidents. A 10-minute response time is the dividing line between life and death. Therefore, with the large increase in allocations, including under Head P.30000 from RM26 million to RM67 million and P.32000 from RM15 million to RM106 million, I would like to ask, when will the Laloh Fire and Rescue Station be built? And I urge that it be expedited. And what is the distance between Laloh and Kuala Krai, around 30 kilometres? What infrastructure and logistics facilities will be supplied to Kuala Krai Fire Station, Sungai Durian Fire Station and Dabong Fire Station, as well as the Manek Urai Volunteer Fire Brigade, with that large additional allocation? Mr Chairman, I refer to P.00100 – Small Projects Under Local Authorities — Small Projects in Local Authority Areas. The allocation has risen extraordinarily, by 54.1 per cent,
to RM689.06 million. Likewise, the Rate Assistance Contribution or SMK under B.040300 has risen to RM480.87 million. The question is, why does this official Parliamentary document not state at all the distribution formula, the list of local authorities, the recipients or the breakdown by state? Why can we only learn of KPKT's project distribution through the political announcements of the Minister during the Sentuhan Kasih tour series? This is the national budget being debated in this august House, not a discretionary fund of the ministry. Just look at the record in Kelantan in 2025: of RM146.22 million for 24 announced projects, only RM26.38 million, or 18 per cent, was actually channelled through local authorities. The rest was directly controlled by local authority agencies or federal agencies, KPKT agencies or federal agencies. In areas like Kuala Krai, which face constraints in assessment tax revenue compared with City Councils on the West Coast, bypassing the role of local authorities and not referring to the constituency's Member of Parliament is a form of systematic marginalisation. Even worse, in 2025 the actual expenditure recorded under the Small Local Authority Projects item was only RM29.11 million. Therefore, Kuala Krai demands an explanation. First, is the guarantee of RM689.06 million in 2027 able to be fully spent, or is it merely a numbers gimmick? Second, what are the real criteria for distribution between big cities and rural local authorities such as Kuala Krai District Council and Dabong District Council? Both are located within the Kuala Krai Parliamentary constituency. Mr Chairman, under the same item, Kuala Krai wishes to criticise KPKT's spending priorities under MADANI Sustainable regarding the BMW-i Smart Toilet Project, which costs up to RM1 million per unit, with a target of at least one in every state. Imagine if the 13 state capitals each built these smart toilets, the cost alone would reach RM13 million, nearly half of the annual allocation of RM30 million to repair all local authority public toilets across the country. Where is the sense of value for money when 758 of the 3,940 local authority public toilets nationwide still rank below four stars. In interior areas and small towns such as Kuala Krai, Manek Urai and Dabong, the people and market traders do not ask for dashboards, digital monitoring or high-tech automatic doors.
They only want basic public toilets that are clean, not blocked and have a stable water supply. We do not want this RM1 million smart toilet to end up like
the MyKiosk project that was impressive on its opening day but ultimately became a maintenance cost burden for local authorities (PBT). The last one, Chairman, is P.01600 – Rented People's Housing and also P.01604 – Project Rehabilitation. Look at the major contradiction in the People's Housing Policy under these items, under the heading National Housing. While allocations for new projects such as PR1MA have surged by nearly 300 percent and Rumah Mesra Rakyat has been allocated RM500 million, even though actual expenditure in 2025 was zero, the allocation for rehabilitation of housing projects has been brutally cut by 54.4 percent to only RM6.5 million. Even for maintenance of old PPR in 2026, out of RM79.9 million in applications, only 56 percent were approved. How can the government talk about a target of zero abandoned projects by 2030 when the rehabilitation fund has been cut by more than half, while 13,000 applications for Rumah Mesra Rakyat are still languishing, waiting for construction. In Kuala Krai itself, many low-income people are still waiting for RMR approval, as well as rehabilitation of existing housing due to flood damage and age.
Honourable Member, your time is up.
Thank you, Chairman.
Thank you, Honourable Member for Kuala Krai. I now invite the Honourable Member for Rasah.
Thank you to the Honourable Chairman for the opportunity given to me to take part in the Committee stage of the Ministry of Housing and Local Government (KPKT) today. The first matter I want to mention is under Item 00100 – Small Projects in Local Authority Areas. I see an increase in allocation from RM447 million to RM689 million this time. I welcome it; these small projects usually have a very positive impact and help people across all areas. However, we all know that this will be channelled, the allocation is channelled to local authorities (PBT), local authorities across the country. My question is, if a PBT has no councillors and does not hold a full council for three months or more. This has happened in Negeri Sembilan. Seven PBTs now, for the past three months, have had no councillors. You know, of course what has happened. After the sakau gang won, this is what happened, which has thrown the situation in Negeri Sembilan into chaos. No councillors, no Exco, the Menteri Besar may or may not be there, we also don't know. As a son of Negeri Sembilan, I also don't know whether they are there or not, and the people are wondering.
So, my question is, whether PBTs without a full council, which do not hold a full council for three months and possibly continuing, for an unknown length of time, will still receive the channelling of this allocation or not? I ask whether there is a reason for this to continue. The continuity of small projects in the areas must be ensured.
Bakri, sikit.
Yes, Kepong. This is Kepong.
Rasah.
Do you agree, Honourable Member Bakri... [Interjection]
Eh, it's Rasah lah.
Rasah.
Eh, sorry.
Just sit like that. [Laughter]
Rasah, Rasah. A little, a little. Do you agree, Honourable Member, that the government should bring back local government elections? If they cannot be held across the whole country, start with Kuala Lumpur.
Start with Kuala Lumpur, right? Starting with Kuala Lumpur, I agree. Mr Chairman, I will ask for additional time because Kepong has already disrupted things earlier. So, I want to get certainty from the KPKT: for the seven PBTs in Negeri Sembilan, will it still be channelled? I certainly request that it be channelled because there is an interest. It is not for the government, not for the sakau gang, but for the people. The second matter I want to mention is under Item 00500 – Solid Waste Management. I see RM317 million allocated, under development allocation. I want to know, what kind of development allocation is this? Does it involve the construction of new disposal sites, including incinerators and so on? So, I ask for an explanation from the government regarding this matter. Because this is a development allocation, and if there are incinerators and disposal sites, what technology will be used to ensure environmental sustainability, and what is the distance from the nearest residential and commercial areas? The third matter under Item 040300 – Rate Assistance Contribution (SMK). We know this is a contribution from the Federal Government for government buildings as a replacement for door tax or assessment tax. I refer to RM480 million for Budget 2027. This is more compared with RM420 million in Budget 2026. Before that, 2025, RM405 million. 2024, RM393 million. For the three years before that, the increase was only around three or four percent. Why has the contribution under SMK increased by 15 percent this time?
The government needs to explain the 15 percent increase from RM420 million to RM480 million. Did any PBT in Malaysia raise its door tax rate, causing this surge? Because if we go by normal patterns, surely within one year, so many government premises have not suddenly been newly built. So, I ask for an explanation from the government. If any PBT has increased door tax or assessment tax, please inform us, because the people need to know which PBT has done so. And the last item I want to raise is under 030400 – Housing and Strata Management Tribunal, RM11.5 million. We know the management of the tribunal runs as usual. However, I want to ask, so far, what is the percentage of cases successfully resolved through this tribunal? This is commonly known, if a home buyer buys a house or premises from a developer, not a sub-sale outside. However, one thing, the claim limit under this tribunal is only RM50,000. Is there any proposal from the government to review this RM50,000? Because I think the RM50,000 limit has been in place for more than 20 years. Twenty years ago, RM50,000 carried a very big meaning and was very significant for home buyers compared with developers. Now it is very different, house prices have soared. So, I ask for the government's view on this matter. Thank you to the Honourable Chairman.
Thank you, Honourable Member for Rasah. I now invite the Honourable Member for Tumpat.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Honourable Chairman. I refer to Item 020400 – Urban and Rural Planning (PLANMalaysia) and 020500 – Urban Sustainability. Does the KPKT have a specific plan to upgrade towns and small towns along the border, such as Tumpat, Wakaf Bharu, Pengkalan Kubor and Chabang Empat, into more orderly, clean, safe and economically viable small towns? We need such development plans, taking into account Tumpat's position as a Malaysia–Thailand border district, coastal and island areas exposed to flooding and erosion. However, it has great potential in terms of tourism, trade and community economy, equipped with the facilities that are needed—facilities for persons with disabilities (OKU), surau and also toilets. This upgrading also needs landscaping, public spaces and various facilities, including digital facility training for services for district councils. Next, under the development of markets and economic centres, Tumpat wants to ask, does the government have a market design? Because what is being built today,
for example at Pasar Sumayyah, the market design is not monsoon-friendly or suited to the local climate. After it is built, when it rains, rainwater enters the markets. So, is the government prepared to change the design of markets to suit flood-prone areas, which I think is unreasonable, that we build a straight building without a suitable roof for markets in Kelantan? Does the KPKT have a special fund to upgrade public markets? Today we see the state government has already stated plans for the redevelopment of Pasar Chabang Empat, and does the KPKT have additional support or assistance for land acquisition as well as facilities for the construction of this market? And we see in the budget, the KPKT announced about RM60 million for public markets, and how much has already been allocated for markets in Kelantan? Under Item 00100 – Small Projects in Local Authority Areas. We see there is no clear formula. So, we ask that the approved and spent allocation amounts and the remaining balance for all KPKT projects in the Tumpat Parliamentary constituency for the period 2023 to 2026 be stated, by project, location, implementing agency and progress status. How is it that in Kelantan we see these PBTs holding programmes and the state government not being involved in many programmes to select projects, and is the constituency Member of Parliament not consulted? Because we consider this an important matter before a project in the area is approved. Under 00100 – MADANI Sustainable. We want to ask about the statement made in Parliament regarding the construction of BMW-i toilets opened at Dataran Putrajaya, Kuala Lumpur, Ipoh, Georgetown, Kuching, Kota Kinabalu and Johor Bahru. However, not one is in the East Coast.
So, will this also be done on the East Coast, and when? We also want to know, how much cost must be borne, including for lifelong maintenance, supervision and monitoring of these BMWs? And we also want to ask, is there any project to upgrade public toilets in Tumpat, particularly in Pengkalan Kubor, Wakaf Bharu, Pantai Sri Tujuh and also Pantai Geting? Under 01604, 01600, 01513 and also 00110 – People's Housing. Based on the DOSM report, we see Tumpat is among the poorest parliamentary constituencies, where absolute poverty is 12.7 percent. So, can the KPKT allocate a special additional quota of Rumah Mesra Rakyat for the poor, for fishermen, farmers, senior citizens and single mothers? This is based on existing facts so that they can be helped, especially since it is not only a large population but also a limited area that requires assistance from the Federal side for housing like this.
Next, under Item 00500 – Solid Waste Management. We want to ask the government, how is KPI 2027, which targets 45 percent of waste to be diverted from disposal sites, going? Is this 45 percent target measured nationally or only in states under Act 672? And what is the achievement in each state? For states that have not adopted this Act, how will they be helped? Because we see that although Selangor has not yet entered this project, they have been given― The Cabinet agreed to extend implementation to Selangor on 29 July 2026. And next, under 30000, 31000, 32000, the Fire and Rescue Department (JBPM). Tumpat wants to apply for facilities such as the number of vehicles and operational equipment, because we face not only floods but also fires at waste disposal sites and forests frequently. So, a more effective communication system is needed. And the upgrading and addition of the Tumpat Fire Station so that it can help response time, the readiness of personnel and service coverage during emergencies. Under Item 00200. What are the PPP/PFI projects under this item? Who are the concessionaires and how long is the remaining payment period? We see the remaining PPP and PFI commitment after 2007 is estimated at RM16.4 billion. Has the ministry carried out a value assessment of... [Inaudible] existing contract sites and can the contracts be renegotiated to reduce the financial burden? Under public cleansing, the KPKT allocated RM55 million in a... [Inaudible] For Budget 2026 for cleaning and upgrading drains and ditches in PBT areas. The Tumpat question is how much of this allocation is channelled to areas in Kelantan, especially those affected by floods? Because we believe this will greatly help reduce flooding in Kelantan. And finally, 020700 – Kampung Baru Development. In Tumpat, there are several kampung baru, namely Pasir Pekan and also Kampung Baru Nelayan. We see that the KPKT has given allocations to kampung baru. So, I want to ask, what is the budget provided for the restoration and repair of kampung baru, such as upgrading roads, public facilities in these kampung areas, and also the construction of community halls, and also upgrading of drainage and lighting? Because this can help these kampungs. Although they are called kampung baru, they have long been occupied by the community. Thank you.
Thank you, Honourable Member for Tumpat. I now invite the Honourable Member for Pulai.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, greetings of MADANI. Thank you, Chairman. Before Pulai debates, I would like to welcome the presence of 25 Friends of Parliamentarian Wangsa Maju. [Applause] Congratulations and thank you for being with us in Parliament today. Pulai wishes to refer to Item 00100 – Small Projects in Local Authority Areas. The allocation of RM689 million provides greater room for the government to improve and upgrade basic facilities in PBT areas. Focus must be given to the daily needs of residents, including maintenance of local roads, improvement of drainage systems and repair of public facilities, as well as provision of more comfortable and safer community infrastructure. The implementation of these projects is important because the quality of PBT services has a direct effect on the daily lives of the people, especially residents in small housing and urban areas. However, the issues often raised by the people are problems that appear small but recur often and still fail to be resolved thoroughly, such as clogged drains, potholed roads, street lights that do not function, and public facilities that are damaged and left neglected without proper maintenance. Therefore, the increase in this allocation must be followed by a transparent, well-organised project selection mechanism that is truly based on the level of need of residents. The ministry must also ensure the allocation is not only focused on new projects but is also used to solve existing infrastructure problems that have long affected residents' comfort. At the same time, the implementation period of projects must be monitored so that small-scale works are not delayed for too long until the same complaints keep recurring every year. Therefore, Pulai wants to ask, how many small PBT projects are targeted for implementation in 2027? How does the ministry determine project priorities between urban, peri-urban and rural areas? And how many small PBT projects are still not completed under the 2025 and 2026 allocations? Next, Item 04000 – Urban Poverty Eradication. Urban poverty has different characteristics compared with rural poverty, because urban residents have to bear higher costs of housing, transport, food and basic services. People who live in cities may have jobs but still do not have sufficient income to cover family needs. Although the allocation has increased to RM73 million, an increase of RM1 million must be accompanied by a more comprehensive strategy. Short-term assistance alone is not enough
if main issues such as low-income job opportunities, house rental costs and access to basic facilities are not addressed. The KPKT must ensure the urban poverty eradication programme focuses on increasing income and social mobility, not just temporary assistance. Pulai's question is, how many beneficiaries have successfully moved out of the urban poor category after joining the ministry's programme? And how does the KPKT cooperate with other ministries to increase the income of urban poor families? Thirdly, what is the ministry's specific target for reducing the number of urban poor households by 2030? The third is Item 02101 – Public Park Development. Public parks are not merely green spaces but important social facilities for improving physical health, mental well-being and community interaction. In increasingly crowded urban areas, safe and easily accessible recreational spaces are greatly needed by families, children, senior citizens and persons with disabilities (OKU). However, the allocation has increased to RM51.6 million; the ministry must ensure park development is not only focused on large-scale new projects. Existing parks must also be well maintained, including children's play facilities, jogging tracks, lighting and public toilets. Based on Pulai's own experience, dealing with many cases of these housing estate parks that have not been handed over to the government, there are certain facilities in these parks, for example large drains and so on, that have not been handed over to the government. PBTs have let it be and this makes it difficult for the government to carry out maintenance afterwards. So, I ask that this matter be made easier and be resolved well so that services to the people can be carried out. Thank you, Chairman.
Thank you, Honourable Member for Pulai. I now invite the Honourable Member for Langkawi.
Thank you, Honourable Chairman. I now move to Items 020000, 020100, 020500, 00100. All of them are about the stray dog environment. Mr Chairman, recently, an association gathered in front of Parliament, led by the Global Human Rights Federation (Pertubuhan Hak Asasi Manusia Global or Global Human Rights Federation). I happened to be coming out of the Chamber at the time and I saw them
showed pictures of dogs, so I stopped meeting with them. They— I have read all the documents given to me, and it indeed tallies with what happened in Langkawi.
So far, the whole country has 80,000 dogs. And the local authorities (PBT) have also received more than 45,000 complaints, according to them, and 2,000 of them are from Langkawi. And I have studied it, I see that one country that has succeeded is Bhutan, and I request that a study be done on how Bhutan was able to sterilise its dogs up to 100 per cent— it has already been recognised by the World Health Organization, and they were able to control rabies and so on, and they gained recognition. And I also believe that they work together very closely with the government, with NGOs and also with the private sector. And I want to propose that the government take the initiative to give tax incentives to big companies, for example, YTL, which has factories everywhere, S P Setia, Berjaya, Tropicana, all these big companies, should be given tax incentives. And it is they who will take care of these stray dogs in their respective PBT so that this matter can be, once and for all, with permission, eliminated. I see that the PBT are also not consistent with one another; they do not have standard charges. For example, the rates by state and PBT for impoundment fees and penalties under by-laws— each has its own conditions. Dewan Bandaraya, daily impoundment fees of RM2 to RM15. Then, fines of up to RM2,000 or one year's imprisonment. Selangor is different. Majlis Bandaraya Subang, between RM100 and RM250, fine RM2,000. Johor, Majlis Bandaraya Johor, RM10 to RM30 hostel fee for dogs, fine RM1,000. This one is fine, but when NGOs complain to me, for example stray dogs are caught, these dogs have owners, but they are released and then caught again. When the owners do not collect their dogs, the NGOs feel sympathy, feel sympathy for these dogs and they want to take these dogs from the PBT. The PBT charges RM2,000 per dog. How could these NGOs, who volunteer to care for these dogs, be charged for that? So, I think it is good that the PBT review and standardise across the whole of Malaysia. If there are NGOs that are interested in taking these dogs, then the charge should be very, very minimal. I think the PBT should not make money from these dogs. And I also received information that officers from the PBT— I apologise, PBT officers, including my own PBT. Those who catch these dogs, they are not, as people say, non-experts and nor are they animal lovers. Unlike me
an animal lover, a lover of cats and dogs. And these people have given me many pictures, and it saddens me to see them. A dog, the claws, they pulled them out. Then they use a noose around its neck and hoist it up, and the dog dies. The dog dies. So, for such things I think it is good to give them to NGOs. Even if they do not want to pay, give them to NGOs on a volunteer basis. NGOs that love these dogs and cats. There are plenty of these NGOs who came to meet me that day, 29, representing 29 NGOs that love these dogs. So, I really urge the Honourable Member to ask the PBT to review. And I understand the religious matter. Muslims must not touch dogs, but we are permitted to keep dogs. I keep dogs, I have a Rottweiler guarding my garden. No problem. If we touch them, we can purify ourselves and we can pray as usual. But if we give them to those who have no compassion for these dogs, they will torture these dogs, just as happened to Kopi in Besut, just as happened to Rocky in Klang. Thank you.
Thank you, Honourable Langkawi. I invite Honourable Seputeh.
Thank you, Madam Chairman. I refer to Item 030000 – Sustainable Urban Communities. Madam Chairman, I wish to express appreciation to the Ministry of Housing and Local Government (KPKT) for its efforts in building affordable housing for low-income groups, including through the Perumahan MADANI initiative. However, I would like to advise the ministry to be more careful and to carry out a thorough study, including holding engagement with the local community, before planning any affordable housing project in urban areas. This matter is very critical, particularly in Kuala Lumpur, which is now already facing the problem of overdevelopment. The Prime Minister's announcement to establish Bandar MADANI Bukit Jalil, involving the construction of 17,000 housing units in Bukit Jalil, has greatly disappointed the local community. The government appears not to have taken into account at all the critical traffic congestion problems faced by residents of Bukit Jalil, Puncak Jalil and Bandar Kinrara. Although the ministry subsequently announced an allocation of RM250 million to build infrastructure to ease traffic congestion in Bukit Jalil following objections from residents' associations at the Parliament entrance, local residents are still dissatisfied and have little confidence in the proposal.
The proposal, which includes the construction of a four-lane highway and two flyovers, is feared to only channel all vehicle flows to the same point, thereby making the Bandar MADANI Bukit Jalil site a cause of severe congestion, or we call it a bottleneck, for these new roads. Residents are also very disappointed with the action of the authorities in approving four Planning Permissions, Development Orders (DO), to the developer, namely Perbadanan PR1MA Malaysia or PR1MA under the supervision of KPKT, without taking into account the engagement findings of consultants, social impact assessors or social impact assessment consultants with residents' associations. More distressingly, this approval was made without waiting for the report and recommendations from the Bukit Jalil Micro Control Plan Study that was appointed by Kuala Lumpur City Hall. The action of KPKT, which seems to force or bulldoze, we say, the implementation of the project to build 17,000 housing units on the Bandar MADANI Bukit Jalil site has in fact tarnished the good name and noble efforts of PR1MA and KPKT in providing affordable housing in Kuala Lumpur. Madam Chairman, I call on KPKT and PR1MA to adopt a more people-friendly approach and to listen to the hearts of residents before starting any project. PR1MA should implement housing planning by seriously applying the concept of transit-oriented development (TOD). In the context of Bandar MADANI Bukit Jalil, I propose that KPKT collaborate with MRT Corp. to provide a rail service network at the proposed site, along with reducing the density and the number of housing units to be built. The presence of an MRT station will not only ease traffic congestion in Bukit Jalil at present, but also help solve the public transport problems of thousands of B40 and M40 residents in Taman LTAT, PPR Pinggiran Bukit Jalil, Bandar Kinrara and Puncak Jalil. At the same time, I urge PR1MA to fully comply with all the Community Facilities Planning Guidelines set by the Department of Town and Country Planning (PLANMalaysia) in every one of its housing projects...
May I interject?
Ya, sila.
Thank you. I want to ask Seputeh that, as we all know, every area must be zoned under the Town and Country Planning Act 1976, for example residential zones for houses, commercial zones and so on. We have only just learned that the former Prime Minister,
Najib Tun Razak, his house has now been gazetted as a prison. Right.
So, what is Seputeh's view? Since the house is in an area, a residential area. Can the house now be gazetted as a prison, given that it is most likely located in a residential zone? Thank you.
Thank you, Honourable Bukit Gelugor. This is a good question. I want to include it as part of my speech and I hope KPKT will give an answer to us all. That is all, thank you.
Thank you, Honourable Seputeh. I invite Honourable Putrajaya.
Thank you, Mr Chairman. First of all, I have just read a statement from the police, Mr Chairman, just briefly, related to the student who died at MCKK yesterday. So, it is a saddening situation, a ligature around the neck was the cause of death. So, let us all pray for the best for the late student and also for the family of the late student. And I would like to touch on the safety of students. In this context, it is road safety in the vicinity of schools. We know that not all schools are— not all roads around schools are under the PBT, but many schools where the areas around the school, in front of and beside the school, are— their roads are under PBT supervision. What happens is that we see accidents in the areas around these schools because drivers are driving vehicles too fast. Some areas have been treated with bollards, with rumble strips and so on, but there are still many school areas that need to be looked at by the PBT, including in Putrajaya. So, that is why I want to take this opportunity to raise a matter that needs to be looked at comprehensively, not only in Putrajaya, but throughout the country. Because of our culture, even if there are lines, we call them black and white striped lines, zebra crossings in front of schools, drivers do not— still do not have the culture of slowing down their vehicles when they see school areas or see these zebra crossings. It is different overseas. When we look, they understand that it is a school area, and each one automatically slows down their vehicle. That is why we need other interventions. We
need other interventions in building this culture. Interventions by the PBT to ensure vehicles are slowed down in school areas, including rumble strips, yellow criss-cross lines and so on, need to be looked at according to suitability. Next, Mr Chairman, Item 020100 – Local Government. Still within the same item. I want to touch on the management of abandoned vehicles in residential areas. There are many cases of abandoned vehicles in Putrajaya and not only in Putrajaya, but throughout the country. When these vehicles are placed in residential parking areas where there is really not enough space to park, these abandoned vehicles become a burden on the community in that area. Vehicles have been sitting there for 10 years already, no action, no action taken. So, I request that KPKT look at this matter comprehensively. We know there are some constraints. If the constraint is a technical issue that requires relevant laws to be drafted, then bring it quickly. If not, this matter will drag on and will not only become a constraint for residents in that area to park, but also cases related to wild animals and so on. So, I request that KPKT look at this matter. Next, I want to touch, finally, on the issue of stray dogs. Earlier, Langkawi mentioned the method of capture and so on. I always mention it. I lived in Australia for 20 years, we have no problem with dogs, but the way of managing them must be systematic. What we see, the data shared by the Honourable Deputy Minister in this House, on 18 November. On 16 November, as I recall, it was mentioned that in 2025, 45,804 complaints were made and a total of 24,195 operations, in which 80,412 stray dogs were caught. If 80,000 were caught in one year, imagine the total number of stray or wild dogs in this country— 80,000 caught, but we know that if there are 10 in Putrajaya, it is difficult to catch even one. So, it means, if we say these 80,000 are from— 10 per cent of the total, there could be 800,000 or perhaps reach a million stray dogs in the country. This is a crisis. I have said it many times. We can talk about how to catch them and so on, but KPKT must take immediate action. This is a crisis, Mr Chairman. If there are a million in this country breeding, how many in the span of one year, we will face a much more difficult situation. That is why I ask KPKT to issue a complete framework
for managing stray dogs in this country. Arrange whoever catches them, whatever the best method, but we have to solve it. Thank you, Chairman.
Thank you, Honourable Putrajaya. Now I invite the Honourable Deputy Minister of KPKT to respond. Time 30 minutes.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. [Reading a short prayer] Mr Chairman and Honourable Members, I record my appreciation to the Honourable Members— to the Honourable Member for Tambun who is also the Minister of Finance, for the allocation of RM6.355 billion to the Ministry of Housing and Local Government through the Fifth MADANI Budget for 2027. Of this amount, RM2.159 billion is allocated for operating expenditure and RM4.196 billion for development expenditure, compared with an allocation of RM6.088 billion in 2026. This amount increased by RM266.74 million or equivalent to 4.38 per cent. Mr Chairman, the theme of Budget 2027, "Menggapai di Langit, Mengakar di Bumi" outlines the ministry's responsibility to align the nation's development aspirations with the daily needs of the people. KPKT will realise this through infrastructure development that opens up employment opportunities, generates income and supports the provision of comfortable housing to live in. I record my appreciation to the 27 Honourable Members who have been announced as debaters and who have taken part in the Committee stage debate on the Estimates of Expenditure for KPKT, in the order announced: Honourable Jelutong, Honourable Maran, Honourable Beaufort, Honourable Padang Serai, Honourable Gopeng, Honourable Kuantan, Honourable Shah Alam, Honourable Hulu Selangor, Honourable Bakri, Honourable Rompin, Honourable Sri Aman, Honourable Parit, Honourable Betong, Honourable Pendang, Honourable Ampang, Honourable Temerloh, Honourable Klang, Honourable Kangar, Honourable Keningau, Honourable Selayang, Honourable Kuala Krai, Honourable Rasah, Honourable Tumpat, Honourable Pulai, Honourable Langkawi and also Honourable Seputeh and Honourable Putrajaya.
With your permission, Mr Chairman, I will answer the matters raised one by one, giving priority to the Honourable Members who took part in the debate and are still in this House. Mr Chairman, the Honourable Jelutong— before that, Honourable Chairman, I wish to touch on— said this, to conclude. All the matters raised by the Honourable Members, I think, are all important. And as the Deputy Minister who has been listening from 12.20 p.m. earlier, right up to the final moments, the Honourable Putrajaya, we will go through everything, Honourable Chairman. Not only while I answer here, but so that we can see the progress one by one, especially as raised by the Honourable Kuala Krai. I take a very serious view of the position and the progress of completing the phases, which ought to have had better progress. Mr Chairman, the Honourable Jelutong raised the issue related to PPR in Kota Giam, Jelutong. For the information of the Honourable Members, the Kota Giam People's Housing Project (PPR), Jelutong, Penang, is planned to be implemented by the Ministry of Housing and Local Government in collaboration with the Penang State Government through the Penang State Housing Board, using the bulk purchase approach, or end block. This approach is a new method of implementing PRR which aims to accelerate the provision of people's housing, optimise development costs and harness strategic collaboration between the Federal Government, state governments and also the private sector.
In this regard, the state government also plans to optimise the development potential of the area around the project site through mixed development encompassing the Kota Giam PRR component and also Rumah Mutiara-Ku. For this purpose, the Penang State Housing Board is currently in the process of procurement for the appointment of a project management consultant to prepare the planning and overall development concept. In terms of the latest status, Honourable Members, the Penang State Housing Board is holding negotiations with the developer who was appointed on 2 October 2026 to detail the development concept, including the Kota Giam PRR component. The Penang State Housing Board targets that the planning permission can be obtained in the first quarter of 2027, subject to the finalisation of the development concept and the approval process of the relevant authorities.
Next, the Honourable Member for Jelutong also raised the issue of stray animals. Mr Chairman, the Ministry of Housing and Local Government (KPKT) adheres to the principle that every living creature has the right to be treated with compassion and affection. Therefore, the strategy for managing stray animals in the areas of Local Authorities (PBT) has been designed in a balanced way, to safeguard animal welfare without neglecting public safety. To control the stray dog and cat populations in a sustainable and humane manner, the ministry together with PBT is implementing three main approaches. The first is the transformation of detention centres into compassionate adoption centres, where the ministry is upgrading existing detention facilities into adoption centres, as well as managing stray animals through a trap, reclaim, rehome and dispose approach. Full priority is given to reclaiming by owners and rehoming, through close collaboration with non-governmental organisations (NGOs). All PBT members are required to comply with the standard operating procedures (SOP) for humane handling and to undergo competency training periodically. The second is population control through sterilisation and incentives to reduce uncontrolled breeding in an ethical manner. PBT, together with the Veterinary Services Department and NGOs, is expanding targeted sterilisation programmes. Animal owners, meanwhile, are encouraged to sterilise and microchip their animals through incentives such as licence fee rebates. The third is tackling the root causes through compassion and responsible ownership, as the problem of stray animals stems from the attitude of abandoning pets. Through the Stray Animal Management Campaign carried out— 2024, we are educating the public about responsible ownership and instilling the value of loving animals from school days. At the same time, PBT is reviewing its by-laws, or UUK, to impose stricter penalties on careless owners, while cases of cruelty are referred directly under the Akta Kebajikan Haiwan 2015 or Akta 772. Mr Chairman, our goal is clear. It is not merely to control the population on the streets, but at the same time to build a caring and responsible society so that the harmony of the people and the welfare of every creature are always protected. We always remember the Prophet's advice, "Kasihilah mereka yang berada di bumi, nescaya kamu akan dikasihi oleh yang berada di atas langit"...
Timbalan Menteri.
Timbalan Menteri.
If possible— let me first, Jelutong.
First of all, I also touch on the matter of stray dogs just now. I came prepared to make things easier for the Deputy Minister. I heard the explanation just now, but if we look at it in general, the explanation is almost the same. However, the data provided by the Deputy Minister on 16 November the other day, 80,000 a year, that is the number caught, shows that the number out there is far too large. So, if we take the same approach to resolve this issue, I think we will place Malaysia in a major crisis within the next few years. Therefore, a comprehensive approach is needed. This requires a whole-of-government approach, to look at it as a whole. If we talk about catching one or two, that is possible. This is 80,000 caught a year. As I mentioned, if 80,000 are caught, let us say 10 per cent of the total, that is already RM800,000, more than— one million. So, that is why there needs to be— I request that KPKT regard this as the main focus of KPKT to resolve by 2027. Thank you, Deputy Minister.
Thank you, Deputy Minister. I appreciate the statement made by the Deputy Minister that we must love every living creature. However, I urge and call on the Deputy Minister, if possible, that this recommendation also be applied, that this approach be adopted by the Local Authorities, especially when carrying out the task of catching stray animals, because of two incidents involving Local Authorities. One involved a dog, Kopi, in Besut, where the dog was shot. And second, the incident involving a dog named Rocky, who was strangled in Klang, which went viral. So, I request that this approach be adopted also by the local authority personnel. Thank you, Deputy Minister.
Mr Chairman, first, regarding Putrajaya. I think the Putrajaya proposal is sound, and we take it as a proposal that needs to be given thorough attention. Beyond that, I think there is no need here, but it needs to be brought back. As for what was proposed by Jelutong just now, we do place emphasis on that. Next, Mr Chairman, I think it is like this, yes. If I may, Mr Chairman, let me finish answering these points first, and then perhaps if there are any at the end. If not, I will not be able to get anywhere, Mr Chairman, yes. The next is what was raised by Maran concerning PPR. There are four questions raised by Maran concerning this PPR. First, I would like to touch on housing needs, where the Honourable Member, the provision of affordable housing under the Thirteenth Malaysia Plan will also continue the existing momentum of implementation through integrated cooperation and commitment at the level of the Federal Government, state governments and also private developers.
Under the Thirteenth Malaysia Plan, the target for the provision of affordable housing has already been set at one million affordable housing units for a period of 10 years. The setting of this target takes into account projections of population needs as well as demographic and socio-economic information. As for the matter of first home ownership applications asked by the Honourable Member for Maran too, for now, Honourable Member, the ministry does not have specific data on the number of first-home applicants because the housing ownership data published by the National Property Information Centre (NAPIC) only involves data on residential ownership transactions. However, based on data from the Household Income and Expenditure Survey (HIES) 2024, the home ownership rate for households in Malaysia is 78 per cent. Meanwhile, the remainder are renting or living in quarters. As for the third question raised by the Honourable Member for Maran, which concerns the number of people awaiting housing ownership in the states. For now, the ministry does not have specific data on the total number of people on the housing waiting list, because this demand data is coordinated by the respective state housing authorities. In this regard, the coordination of this data will be strengthened through the development of an integrated housing data repository, through the big data analytics and housing and local government cluster visualisation project that we will begin under the Thirteenth Malaysia Plan. This approach will enable the analysis of supply, demand, house price, income capacity and market mismatch to be carried out more systematically by locality. Fourth, the Honourable Member for Maran also asked about PPR Luit. For the Honourable Member's information, the slope repair works and housing units at PPR Lut are still continuing. These works are expected to be completed by the end of 2026, after which they will be handed over to the Pahang Housing and Real Estate Board for the occupation process. Next, the Honourable Member for Maran also raised a question or touched on fire services. The basis for setting the target stated, the 66 per cent target, takes into account efforts to expand fire service coverage through the construction and operation of several new fire stations, procurement of new machinery and logistics equipment, and activation of volunteer fire teams. As of October 2026, the achievement of the percentage response time for emergency calls under 10 minutes by the Fire and Rescue Department of Malaysia, for the response time key performance indicator (KPI), is 65.77 per cent, compared with the achievement of 67.51
per cent in 2025. Overall, the average achievement for the three-year period from 2024 to 2026 is 66.78 per cent. The setting of the 66 per cent target for 2026 is based on the average achievement for that three-year period, taking into account the current performance trend of the Fire and Rescue Department of Malaysia.
For the information of the Honourable Member for Maran too, the latest status of the proposed construction of the Chenor Fire Station in Kampung Awah, the land site that was proposed earlier by the Honourable Member, we could not proceed due to caveat issues, and this has been resolved, where the latest status of the land is that it is owned by the state government under the supervision of the Maran District Council. However, Honourable Member, the Maran District Council has provided a new site proposal, which must go through the ownership process by the Fire and Rescue Department. At the same time, a risk assessment will be carried out to determine the suitability of the site for the construction of the new fire station. I take note that this matter has already been raised by the Honourable Member several times in this august House, insya-Allah. Next, Mr Chairman, from Beaufort, the Honourable Member also asked about PPR Selagon. The Honourable Member specifically touched on the issue of PPR Taman Permai Selagon, or PPR Kampung Selagon. This project has already been approved under the Tenth Malaysia Plan with a scope of building 67 single-storey terrace housing units together with public facilities, at an original contract value of RM23.7 million. However, Mr Chairman, this project, which has been completed, could not be handed over or occupied due to the detection of several critical issues, which are very critical. Initial investigations found a very serious structural cracking problem in one terrace block housing eight units. In addition, five other units from separate blocks also experienced moderate cracking due to the phenomenon of land subsidence that affects the stability and structural integrity of the entire development. The ministry, with the technical cooperation of the Public Works Department of Sabah, has taken proactive and comprehensive steps by carrying out forensic testing and geotechnical investigations from October 2024 until May 2025. The results of this geotechnical analysis, Honourable Member, reveal that the main cause of the structural failure is the uneven soil strata profile at the construction site. This condition was worsened by the presence of soft soil layers and a high organic content, which directly triggered soil instability due to uneven settlement.
Based on these findings, Honourable Member, the ministry is now carefully evaluating several proposed solutions and technical approaches that are suitable. The official decision on the new direction for this project will be finalised in the near future, and this cautious step we must take more carefully, to ensure that every decision made can provide a thorough, effective and equitable long-term solution for all stakeholders. The Honourable Member for Beaufort also asked about PPR Beaufort in phases. Honourable Member, the Federal Government is always committed to providing comfortable and affordable housing for the people of Sabah. The implementation of the people's housing projects, or PPR, which we mentioned earlier in Sabah, so far is the highest number in the whole country, with a total of 39 PPR projects approved by the government at the state level of Sabah, with 26,299 housing units. Of these, 37 PPR projects involving 25,449 housing units have been completed. Furthermore, in Sabah there are two projects involving 850 housing units still in the planning stage. The Ministry of Housing and Local Government has taken proactive action to ensure that conducive residential needs can be provided based on the demands and needs of the people, as well as what the Honourable Member has raised. The ministry has extended the application to the state government to submit a list of priority project proposals for the Rolling Plan, the fifth— third, and also the fifth under the Thirteenth Malaysia Plan. Accordingly, any proposals for new PPR projects or new PRR in this state will be subject to recommendations or priority ranking by the state government itself, taking into account the suitability of the site and also the approval of allocations by the Ministry of Economy. The Honourable Member also asked about RMR, Rumah Mesra Rakyat. For the information of the Honourable Member, for the Rumah Mesra Rakyat Programme in the state of Sabah, RM22 million has already been allocated for the implementation of 318 Rumah Mesra Rakyat units in 2027. For 2026, 21 Rumah Mesra Rakyat units in the Beaufort Parliamentary constituency have been completed, while three more units are still under construction. For 2027, SPNB is identifying applicants who can meet all the eligibility requirements for the implementation of the Rumah Mesra Rakyat Programme.
Implementation in each state is based on targets and allocations approved by the state government. Therefore, Honourable Member, if possible, please discuss with the state government so that attention is also given at the Beaufort level. This will also help us to assist the Honourable Member. Next, Mr Chairman, Padang Serai...
Tak ada.
Padang Serai is not here. Gopeng. Gopeng raised issues of urban sustainability, and about drainage system design that keeps pace with change. Honourable Member, the concept of sponge city, or bandar span, emphasises the capacity of urban areas to absorb, store, filter and release rainwater in a controlled manner through the integration of natural elements and blue-green infrastructure. In this regard, the Ministry of Housing and Local Government, through PLANMalaysia, is developing a draft Planning Guidelines for the Implementation of Sponge City Malaysia, or Bandar Lestari Air, as a planning standard to apply these principles in accordance with the physical, climate and hydrological context and urban environment in Malaysia. This approach emphasises a shift from engineering-based flood management alone to integrated solutions based on nature, in line with the sustainable development agenda and efforts to adapt to climate change. With regard to the drainage system design standards, the Manual Saliran Mesra Alam (MSMA) Second Edition 2012 and the Pelan Induk Saliran Mesra Alam (PISMA) by the Department of Irrigation and Drainage (JPS) are our main references in stormwater management, especially in urban areas, covering aspects of planning, hydrological calculations, and the design of drainage systems and facilities. Meanwhile, Hydrological Procedure No. 1 (HP 1) 2015 by JPA provides methods for calculating the Areal Rainfall Factor and also the Climate Change Factor as an adjustment factor in estimating the design rainstorm, taking into account the potential change in rainfall distribution patterns due to climate change. Both of these documents, Honourable Member, complement each other as planning reference documents that must take into account current needs and the effects of climate change that the Honourable Member has suggested. To ensure the implementation of this initiative can be coordinated in an integrated manner, KPKT through PLANMalaysia will collaborate with PETRA, NRES, JPA, state governments, local authorities and also the relevant technical agencies. This coordination covers data sharing, hydrological information and land use, flood risk assessment, coordination of infrastructure development planning, and the incorporation of water-sensitive urban elements in the process of preparing and reviewing development plans.
infrastructure development planning, and the incorporation of water-sensitive urban elements in the process of preparing and reviewing development plans. Mr Chairman, the next is Kuantan. My friend from Kuantan asked about landscaping. Honourable Member, the government is always committed to ensuring that the development of new residential areas takes into account the need to provide open spaces and recreational facilities, such as children's playgrounds, to ensure the well-being of the local residents. In this regard, the provision of such facilities must be given attention by developers, subject to the applicable laws, policies, planning directives and guidelines, including the Akta Perancangan Bandar dan Desa 1976 or Akta 172, as well as the approval conditions set by the local authority. For existing residential areas, local authorities may consider residents' applications for the provision or improvement of recreational facilities based on local needs, development priorities and the financial capacity of the PBT, subject to approved allocations. And the government, particularly through KPKT, will continue to encourage cooperation between developers, PBT and the local community, so that adequate, quality and inclusive recreational facilities can be enjoyed by our society. Mr Chairman, next is Shah Alam. Is Shah Alam here?
[Speaking without using the loudspeaker] Yes, I am here.
Shah Alam raised the matter of maintenance of public housing. There are four questions on this matter, Mr Chairman. A total of 214 applications involving aspects that have been identified as having a direct relationship with the well-being and safety of occupants of PPR, high-rise strata or low-cost public housing that require financial assistance for repair or maintenance work.
However, with the very limited allocation of RM47.25 million allocated for 2027 to maintain PPR, the ministry will carry out a more detailed and targeted assessment by focusing on damage that is more critical to the safety and comfort of occupants. This focus is more on damage that may affect the daily activities of residents, such as lifts, roofs, water tanks and also the reticulation system, sanitary pipes, electrical wiring, and general damage involving shared property. That is
...the priorities we have while we manage very limited resources. Apart from that, the ministry also gives priority to maintaining PPRs that are more than 10 years old and above. This ministry, Honourable Member, will continue to be committed to helping PPR residents and will always strive to expedite the repair and maintenance of housing, despite limited resources, so that residents can benefit from a safe, conducive and comfortable housing environment to live in. Mr Speaker, if we go by our feelings, we all want to help Mr Chairman. Mr Chairman, Shah Alam also asked about matters relating to housing, and there are four sub-questions. Honourable Member, according to the SPNB (National Housing Company) records since the Rumah Mesra Rakyat Programme was introduced in 2002 until October 2026, the total applications for Rumah Mesra Rakyat that we have received, that have been approved and are being implemented, are as follows. The total number of applications is 210,579 from 2002 until the latest. The total we have approved is 83,090, while the total still waiting is 14,644. The total that has been completed and handed over with keys is 81,283. The total still at the construction stage is 807. To answer the second and third questions from the Honourable Member for Shah Alam, which also relate to the Rumah Mesra Rakyat issue, for the Rumah Mesra Rakyat Programme under Budget 2026, a total of RM500 million was allocated to SPNB to continue the provision of Rumah Mesra Rakyat. Of that amount, RM463.36 million was channelled specifically to the implementation cost of 6,545 housing units nationwide, while the balance of RM36.6 million was allocated for payment of bank interest rates for the SPNB housing programme. Moving on to Budget 2027, Honourable Member and Mr Chairman, this commitment is continued with an allocation of RM500 million from the Ministry of Finance (MOF) to the Ministry of Housing and Local Government (KPKT), where the allocation for the implementation cost of Rumah Mesra Rakyat has been increased to RM472.37 million, while the remaining RM27.63 million is allocated for payment of bank interest rates for the SPNB housing programme. In line with this increase in allocation, Honourable Member, the construction target has also been increased from 6,000 to 6,823 units, compared with the previous one which was only 6,545 units, an increase of 4.2 per cent. To answer the fourth question, in the application for development expenditure (DE) allocation for the Thirteenth Malaysia Plan, SPNB has taken into account the increase in construction costs following the rising prices of building materials, labour wages and the inflation rate. Accordingly, the government has approved the price adjustment of Rumah Mesra Rakyat
to RM75,000 per unit to RM90,000 per unit, while the government subsidy is maintained at RM20,000 per unit...
The Honourable Deputy Minister.
Ya, Kuantan.
Just now, Kuantan raised several issues, but only one was answered. I only request that the others be answered in writing.
He will come to the topic section later.
Okay, thank you.
If we do not have time, then we will ensure the written replies are more thorough. Insya-Allah.
Terima kasih.
This also applies to everyone. Mr Chairman, Hulu Selangor raised matters relating to Felda Soeharto and the need for a fire station. Honourable Member, for the information of Mr Chairman and the Honourable Member, the latest check, the fire risk analysis score, found that the risk score in the Felda Soeharto area is 22, where the need to provide fire facilities in the area, based on the discretion of our Fire Department's technical, its layout, is less urgent, Honourable Member. Ha yes, but we can chat again later if you want to discuss further, right. We can...
I think it is not right to say less urgent. The people of Hulu Selangor, the FELDA residents, will certainly find that answer strange. Sorry, very much.
Okay. It's alright, we take that information, Mr Speaker, because what we have is based on the technique carried out by the Fire and Rescue Department...
I very much request that this matter be checked again.
Yes, we take note. However― ha, that's it, don't stand up yet. [Laughter] However, for future planning, the ministry, through the Fire and Rescue Department of Malaysia, has applied for the gazetting of land for a fire station site to FELDA...
Yang Berhormat.
Just a moment, Honourable Member.
And is in the process of completing land acquisition. So, that means there is a ray of hope there, but let's see. Just a moment, Honourable Member, let me finish this first, yes.
Ya.
At present, to ensure that residents of the Felda Soeharto area receive proper fire services, initial assistance is provided by the Hulu Bernam Utara Volunteer Fire Brigade Association (Persatuan Bomba Sukarela Hulu Bernam Utara), at a distance of 14.1 kilometres, which takes about 17 minutes to reach the location. In 2027, the ministry, through the Fire and Rescue Department of Malaysia, has sought to improve the needs of volunteer fire brigades through several measures, among them: first, continuing― just a little, Mr Chairman, yes. Continuing the provision of financial assistance grants at a rate of RM5,000 to each active volunteer fire brigade association, based on the approval of the Ministry of Finance, subject to the department's existing allocation. Second, the latest initiative, repair and maintenance of Volunteer Fire Brigade (PBS) fire stations nationwide amounting to RM1.5 million. Several parties also raised this earlier, for us to focus on them. Third, the procurement of 100 volunteer fire engines together with accessories, valued at RM20 million, in phases from 2027 to 2029. Several Honourable Members also raised this. And the fourth, an allocation totalling RM735,000 for the purchase of personal protective equipment (PPE) such as helmets, fire suits and gloves for firefighting operations. Mr Speaker...
I want to ask about what was raised. Was the house of former Prime Minister, Najib Tun Razak, ever zoned― it is a residential zone, now gazetted as a prison. Was that house ever zoned to a category other than residential, under Akta 172?
Akta 172. Mr Speaker, indeed our entire country has zoning, Mr Speaker. There are open spaces, green areas, residential areas, industrial areas. So, regarding what the Honourable Member asked, if we follow that, there is indeed no basis for it, because it is a residential zone. And this is a new development, whether it will be changed or how, that perhaps we need to see, because this is a new development. As we know, there are some matters that were not in the original planning.
So Mr Speaker, I would like to thank everyone who took part. Believe me...
YB Minister, I request that two more questions be answered in writing later. Thank you.
We will all answer in writing. Mr Chairman, I will take responsibility to ensure that all questions from fellow Honourable Members are answered in writing and thoroughly. Thank you, Mr Chairman.
Thank you, Honourable Deputy Minister. Honourable Members, the question is that the sum of RM2,158,768,500 for Head B.43, Operating Expenditure Estimates 2027, forming part of the Schedule, be agreed to. [Question put for decision, and agreed to] [Head B.43 ordered to form part of the Schedule]
The question is that the expenditure mentioned in Head P.43 in the Development Expenditure Estimates 2027 be approved. [Question put for decision, and agreed to] [Head P.43 approved as part of the Estimates]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.24 [Schedule] – Head P.24 [Development Estimates 2027] –Bill
Supply Head B.24 and Development Head P.24 under the Ministry of Investment, Trade and Industry to be debated.
Honourable Chairman, I want to ask. Ampang wants to ask. Can you give some guidance? Sometimes we debate, and the answers are in writing, but until now we have not received any. Speaking for myself, I am not sure about the others, but no written answers have reached the table.
I request that there be a— people call it guidance, whether within how many days those questions should be submitted. Thank you.
To the Honourable Minister, who has given a commitment to provide written answers to the issues raised, these must be provided within five (5) days to the Honourable Members concerned via email to the Honourable Members.
The list of debaters is as follows: YB Balik Pulau, YB Machang, YB Kepong, YB Jerantut, YB Tuaran, YB Padang Rengas, YB Bakri, YB Kubang Pasu, YB Shah Alam, YB Kapar, YB Putrajaya and YB Batu Gajah. I invite the Honourable Member for Balik Pulau.
Thank you, Chairman. I will go straight to Item 030200 – Trade and Economic Relations. I would like to touch on trade relations in this matter between Taiwan and Malaysia. PMX, in his answer in the Dewan Rakyat, said that exports to Taiwan increased by as much as 88 per cent up to September 2026, and imports also increased by 24 per cent in the same period. In 2025, the total trade between Malaysia and Taiwan was USD54.49 billion, up from USD38.63 billion in 2024. So I want to state here that Taiwan is our fourth largest trading partner, and Malaysia is Taiwan's sixth largest trading partner, in Taiwan. So what I am stating here is that Taiwan is an important trading partner for us, and I would like to ask the Deputy Minister: how many new projects have been invested in by Taiwan, by companies in Taiwan? How much expansion and how many takeovers, to acquire? Because I know that this year the factory where I once worked was taken over by ASE Semiconductor, ASE Electronics, amounting to 680,000 square feet. So I also want to ask about the Malaysia-Taiwan Bilateral Investment Agreement that was signed in 1993, Deputy Minister, 33 years ago, with permission. The purpose of this agreement, among others, was to promote trade and protection of investment, with permission. So, do we need to revisit this agreement, because it is high time for us to revisit it, since it is 33 years. So, I want certainty from the Deputy Minister: do we need to initiate this agreement? I have also heard and read news reports stating that the Malaysia-Taiwan Economic Cooperation Committee Meeting (MTECC), the Malaysia-Taiwan Economic Cooperation Committee, which was scheduled for October last year, has been postponed by the Taiwanese Government due to the Prime Minister's statement in August. So I also want certainty, because before the MTECC was held, there was another meeting, the pre-council, named the Investment Working Group (IWG), which also could not proceed because Taiwan is waiting for a positive signal from the Malaysian Government.
So I hope the Minister can answer the questions I raised just now, between Malaysia and Taiwan, because Taiwan is our fourth largest trading partner. I would like to proceed with Item 030000 – Strengthening International Trade. In the meeting of the International JKPK with the European Parliament delegation, the Malaysia-European Union Free Trade Agreement (MEUFTA) was discussed. Among the matters discussed, because the European Union accounts for our trade, reaching RM228 billion in 2025. I would like to ask, because the MITI Minister has answered in this House that MEUFTA will be signed at the end of June 2027. Is it still on the timeline? And will it meet the time for us to sign? My question is, what about SMEs and other products such as palm oil, that is, relating to the EUDFA, EU— sorry, EU Deforestation Agreement, which also relates to downstream factories, SMEs for example? Will this also be taken into account, because these categories are important when we want to ratify the MEUFTA agreement. Can I have one more minute?...
Time is up.
Terima kasih.
Thank you, Honourable Member for Balik Pulau. I invite the Honourable Member for Machang.
Thank you, Chairman. I refer to Item 030500 – Strategic Negotiations. Mr Chairman and the august House, the government says the United States–Malaysia Reciprocal Trade Agreement (ART) does not force Malaysia to sell our rare earths only to the United States. That is correct, from the perspective of the text, but the danger does not lie in one clause. The danger arises when several clauses are read together. The first is the clause on following United States sanctions. If the United States imposes sanctions or tariffs on a third country on security grounds, Malaysia must take measures with an equivalent sanctioning effect. If tomorrow the United States sanctions China, must Malaysia also sanction our own largest trading partner? This is like the case that occurred with Nvidia. Megaspeed has a subsidiary in Malaysia and was confirmed to be involved in the purchase of Nvidia chips, which were later said to have reached China. So what steps will MITI and the government take, overshadowed by the ART agreement, in relation to this matter involving rare earths in particular?
Second, if we also read the clause on the poison pill, with permission, the poison pill, Article 5.3 of the agreement says the United States may re-impose higher tariffs if Malaysia signs an agreement with a country that is considered to affect the United States' vital interests. Who determines these vital interests? Washington, not Putrajaya. This is why we will have to unofficially seek blessing before selling rare earths to other parties after we signed the ART the other day. The third is that Malaysia's trade policy on export controls is harmonised with United States export controls. This means the list of sanctions is written in Washington, but Malaysia will enforce it. Our thing, we can sell to whoever we want, right? But the United States will force us, making sure we cannot sell to certain countries or parties, and this also raises the issue involving— weakening our downstream policy. This commitment effectively sets aside the ban on exporting raw rare earths that we have enforced. We have given exemptions to France; Macron asked us to give, okay. The same goes for the United States. So if we have given to two or three exemptions, surely other countries will also ask for the same thing. I am worried that what is happening today is that Malaysia is in fact trapped in a technology war or trade war and tech war between the United States and China. The battleground is Malaysia. [Tuan Syahredzan bin Johan (Bangi) chaired the Committee] We all know that when the Democrats have regained the House or the Senate, and ART, although they dislike Trump, the Democrats dislike Trump, but this ART is a gold standard agreement, and we relent to it, with permission, we give. So after this, whoever becomes the President of the United States will make this ART the template for negotiations with us. So I see this as a great burden for Malaysia to face in the trade war, the technology war, which will take decades. It will resolve in a matter of time. No, because this involves a fight between two superpowers, the battle of two superpowers.
So, I see this ART as burdensome, and today it is still not clear. Although the MITI Minister said it is null and void based on the court judgment in the United States, what form of written guarantee from the United States is there that this ART is indeed null and void? Yes. So, that is what I want to raise. Secondly, Chairman, Item 030300 – ASEAN Economic Cooperation Integration. Mr Chairman and the august House, the Honourable Leader of the Opposition has not yet returned from Lugano
yet. He is in Lugano to deliver a keynote address on Malaysia's foreign policy. His proposals on improvements, on ASEAN and Malaysia and world trade. This Lugano Global Forum is like the other version of Davos. So, in Larut— in Larut instead, in Lugano. [Laughter] The Honourable Leader of the Opposition said a proposal that I find sound for consideration by MITI to bring forward as a national agenda: ASEAN must appoint two senior representatives (high representatives) as regional special envoys holding two portfolios. First, on security and peace. Second, on trade and economic affairs. Let us see, we can mirror what the EU does. Although ASEAN is not at the level of the EU, there is no such integration, but we can mimic it. We can imitate it. We can imitate it as best we can, so that we can face global uncertainty, how ASEAN, with further coordination involving ART, involving the trade war and so on, has two highly trained representatives, former diplomats or former Prime Ministers, who can speak with these two power blocs of the world. So, I see that the proposal of the Honourable Member for Larut is worth considering by MITI to be adopted by the Tambun agenda. This is not for Larut but for Malaysia. So, I hope MITI can consider strengthening improvements on the integration of ASEAN economic cooperation. So, that is all from me. Thank you, Chairman. Thank you, MITI.
Thank you, Honourable Member for Machang. Next, I invite the Honourable Member for Kepong.
Thank you, Mr Chairman. First, I would like to ask the government about the Chinese national woman named Huang Le, also known as Alice Huang, who is involved in the recent Nvidia chip scandal. Does she hold shares in a Malaysian company, has she ever visited Malaysia, and is she now banned from entering Malaysia? Second, the Data Centre Task Force has approved 27 projects with an estimated investment of RM225.97 billion. These projects are expected to create 4,053 jobs. Large investments are welcome, but how much has actually been spent? What is the tax revenue after incentives? Who bears the cost of upgrading water and electricity supply? The minimum requirement of 30 per cent local content has been set. What is the actual contract value received by Malaysian companies?
Third, MITI reports that 22,849 participants have gone through semiconductor training towards the target of 60,000 skilled engineers by 2030. How many have actually obtained jobs as engineers? Especially in chip design. Malaysia aspires to become a world-class AI chip hub. How many local companies will produce chip designs, patents and commercial products by 2030? Fourth, MITI's export target for 2027 is only RM1.729 trillion, slightly lower than this year's target. Yet exports in the first nine months of this year have already reached RM1.571 trillion. More worrying, this document records services exports for 2025 at RM195 billion, whereas the Department of Statistics reports RM277.9 billion. RM195 billion is actually the figure for 2023. The value of investments approved in 2025 is also recorded as RM227.8 billion, compared with approximately RM416.9 billion for the manufacturing and services sectors in MIDA's latest data. Are the scopes different, or are the figures wrong? Explain the differences and correct any errors. The competitiveness target for 2027 is 18th place, whereas Malaysia has already achieved 15th place this year. Fifth, MITI has planned a pilot project, the Driverless Valley Ecosystem. Item 050600 allocates RM3.31 million to NAICO, N-A-I-C-O, the national aerospace industry development body. When will the drone pilot project be implemented? Test drug delivery to rural areas, flood evacuation and bridge inspection with the approval of the Civil Aviation Authority. Set cost-safety targets and participation for local manufacturers. We must develop the drone industry and its exports. Finally, the same question as Machang: what is the status of the Malaysia–United States Reciprocal Trade Agreement, and what is the promised cost-benefit analysis? Present its impact on exporters and on Malaysia's freedom of trade policy before any further decision. Thank you.
Thank you, Honourable Member for Kepong. Next, I invite the Honourable Member for Jerantut.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, the mercy of Allah and His blessings, and greetings of peace. Thank you, Mr Chairman.
Item 06000 – New Industrial Master Plan (NIMP) 2030. Within the ministry's performance framework, investment approved in 2025 reached RM227.8 billion, but the 2026 target was reduced to RM107 billion and the 2027 target to only RM120 billion. So my question is, why has the investment target been reduced so sharply when the allocation for the strategic investment fund has increased to RM459.55 million? How much investment and how many job opportunities have actually been realised, or are expected to be realised, through this fund and NIMP 2030? At the same time, data centre development has also become one of the drivers of new investment in the country. As of July 2026, 84 projects have been approved, including 27 projects under the Data Centre Task Force with an investment value of RM225.97 billion. This matter has already been discussed and raised in previous committee meetings. However, these projects are expected to create just over 4,000 jobs. Does MITI ensure that the minimum requirement of 30 per cent local content is truly complied with, and that local companies, especially SMEs, also enjoy contracts from this investment? How does the government ensure that the projected electricity requirement of 8,391 megawatts and water requirement of 389 million litres a day by 2030 do not jeopardise the basic supply to the people and do not increase infrastructure costs for consumers? The second issue concerns SMEs, rural entrepreneurs and state investment facilitation under Item 050300. Many people in Jerantut are small traders and village product producers who face high operating costs and limited market access. In a situation where the investment promotion allocation has increased to RM20 million, the easy automation loan scheme has instead been reduced to RM30 million. So my question is, how many SMEs in Pahang, particularly in Jerantut, have benefited from the MATRADE and HDC automation scheme? Does this promotion allocation also reach rural entrepreneurs, not just large companies? I would also like to ask whether MITI plans to create matching grants or special incentives for state governments that succeed in attracting quality investment?
How can states that provide land, water supply and industrial infrastructure obtain a fairer tax incentive from the investment they bring in? Next, Mr Chairman, the third issue concerns the development of rare earth elements (REE), Item 030600. Malaysia is estimated to have 16.2 million tonnes of non-radioactive rare earth reserves, with a potential value of RM747.2 billion. Perak has so far been reported to have REE mining operations that have obtained the relevant approvals.
The question is, how much actual revenue has the Perak State Government obtained from REE mining and export activities? What is the status of the development of domestic REE processing and separation plants? When will Malaysia be able to move from exporting raw materials to producing high-value oxides, metals, alloys and permanent magnets? And, is there a government mechanism to ensure that these strategic resources provide a fair return to the state and long-term economic benefits to the nation? Finally, Item 030400 – Multilateral Policy and Negotiations is also related to ART. My question is, what is MITI's strategy to increase exports of high-value products to China and to protect local manufacturers from a flood of imported goods? When will the implementing regulations for the Reciprocal and Anti-Dumping Duties Act, which was amended in 2025, be finalised? Has the cost-benefit analysis of ART been completed, and will it be presented to Parliament before any decision is implemented? Thank you.
Thank you, Honourable Member for Jerantut. Next, I invite the Honourable Member for Tuaran.
Thank you, Mr Chairman. In the Federal Expenditure Estimates 2027 under Development Head 24, Item 06000. The government has allocated RM400 million for the implementation of the New Industrial Master Plan 2030 (NIMP 2030). This compares with RM380 million in the revised estimate for 2026. Tuaran wants to know to what extent this allocation is translated into tangible industrial projects, especially in Sabah? One of NIMP's objectives is to develop new and existing industrial clusters. The question is, have we seen the results in the form of investment, technology transfer, skilled jobs and value addition in the states, especially in Sabah? Mr Chairman, Tuaran would like to draw the ministry's attention to a major opportunity at POIC Lahad Datu. Based on MPOB statistics for 2024, the area of oil palm cultivation in Sabah is approximately 1.48 million hectares, equivalent to 26.4 per cent of the national total oil palm planting area. Sabah is the second largest state after Sarawak. This figure shows how great the resource potential we have is. However, have we fully utilised it to develop high-value downstream industries? Empty Fruit Bunches, or EFB, for example, can be processed to obtain cellulose. This cellulose can be used as a substitute for producing fabrics and textiles or processed into
nanocellulose for advanced material applications such as membranes and battery separators, subject to technological and market validation. Palm kernel shell can be turned into biochar and activated carbon. Crude palm oil can be processed into olio-chemicals, specialty fats and bio-based chemicals. This is the change we want: not merely exporting raw materials, but producing high-value products for international markets. Mr Chairman, to realise this potential, POIC Lahad Datu plans to develop the first 75 acres as a Free Industrial Zone dedicated to downstream palm oil processing and the production of advanced materials. This proposal is in line with NIMP 2030, particularly Mission One, Advanced Economy Complexity, and Mission Three, Push for Net Zero, as well as the goal of developing industrial clusters. Tuaran would like to ask the Honourable Minister: from the RM400 million allocation under Item 06000, how much has been approved and disbursed to projects in Sabah? What opportunities are there for POIC Lahad Datu to obtain support through the NIMP Industrial Development Fund (NIDF), particularly for shared infrastructure, processing technology, research and commercialisation? Tuaran would like to put three specific requests to MITI. First, is MITI prepared to recognise the development of POIC Lahad Datu's 75 acres as a strategic industrial cluster under NIMP 2030? Second, Tuaran requests that MITI lead a special task force together with MIDA, the Ministry of Finance, the Customs Department, SEDIA and the Sabah state government to coordinate and expedite the approval and gazettement process for this area as a Free Industrial Zone under the Free Zones Act 1990. Third, Tuaran requests that MITI help POIC identify suitable financing facilities and NIMP support so that infrastructure, technology and commercialisation can be implemented as quickly as possible. This development still leaves room for Sabah GLCs, state investment institutions, palm oil millers and local companies. International investment must bring in technology and expertise to the market, while Sabah companies also become part of the value chain. Mr Chairman, Sabah should not forever remain merely a supplier of raw materials. We have the resources, industrial areas, ports and a strategic location. What is needed now is orderly action and close cooperation between the Federal Government and the state government. Tuaran hopes MITI will give a clear commitment to making POIC Lahad Datu's first 75 acres a tangible example of NIMP 2030's implementation in Sabah. We want to
see this policy translated into factories, technology, skilled jobs and value addition for the people. Thank you.
Thank you, Honourable Member for Tuaran. Next, I invite the Honourable Member for Padang Rengas.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, the mercy of Allah and His blessings, and greetings of peace. Thank you to the Chairman for giving Padang Rengas the opportunity to debate the allocation of the Ministry of Investment, Trade and Industry (MITI) for Budget 2027. I wish to raise three main matters based on the Supply Estimates B.24 and Development Estimates P.24. The first is Item 020200 – Industrial Development and Competitiveness. Mr Chairman, I refer to Item 020 – industrial development, which receives an allocation of RM5 million. In addition, Item 020500 – Environment, Social and Governance in Industry receives RM2.6 million. My question is, to what extent do these allocations help improve the competitiveness of local industries, particularly small and medium enterprises? Second, Item 030700 and Item 040300 – Strengthening, Trade and Investment. Mr Chairman, I refer to Item 030700 – Malaysia External Trade Development Corporation (MATRADE), with an allocation of RM139.67 million, while Item 040300 – Malaysian Investment Development Authority (MIDA) receives an allocation of RM185.44 million. I would like to draw the ministry's attention to the state of Perak, particularly the Padang Rengas parliamentary constituency and the Kuala Kangsar District. This area has potential in food processing, agricultural products, the halal industry and small and medium enterprises. I propose that MITI, through MIDA, draft a specific plan to attract investment to rural areas in Perak, particularly in the Padang Rengas parliamentary constituency. I would like to ask the Minister how much investment has been realised in the state of Perak and what is the new investment target for 2027? Third, Item 050300 and Item 050400 – Investment Promotion and Halal Industry. Mr Chairman, I refer to Item 050300 – Investment and Trade Promotion, with an allocation of RM20 million.
Next, Item 050400 – Halal Development Corporation (HDC) receives an allocation of RM20.04 million. I want this allocation to benefit local entrepreneurs, particularly food and halal product producers in Padang Rengas and throughout the state of Perak. MITI needs to expand assistance for halal certification, packaging, digital marketing and export promotion so that local products can penetrate international markets. At the same time, the NIMP 2030 development allocation of RM400 million and MIDA's strategic investment fund of RM459.55 million must be closely monitored so that investment truly creates jobs and technology transfer. Mr Chairman, in conclusion. The success of MITI's budget cannot be measured only by the approved investment figures but must be based on realised investment and the benefits received by the people. Padang Rengas and the state of Perak also deserve to enjoy the spillover of the nation's industrial development. We in the opposition do not reject development, but we demand transparency, fair distribution and the effectiveness of every ringgit of the people's money. Investment must create jobs. Development must reach the people, and no district should be marginalised. Thank you.
Thank you, Honourable Member for Padang Rengas. Next, I invite the Honourable Member for Bakri.
Thank you, Honourable Chairman. I refer to Item 030200 – Bilateral Trade and Economic Relations, together with Item 030600 – Strategic Trade Secretariat (STS). Investment in semiconductors and data centres depends on access to technology and the confidence of international partners. I would like to raise two matters. The first is the United States chip controls. The rules announced on 16 November tighten the licensing of certain advanced computing chips to Malaysia, as well as the use of remote computing power by entities from restricted destinations, because it was anticipated that GPU licensing and end-use checks could delay data centre projects, while IC design firms may face manufacturing and shipment obstacles. Has MITI conducted an impact study on investment and jobs? What are its findings and mitigation measures? MITI also needs to provide compliance guidance and explain the effectiveness of the strategic trade permits since July 2025.
Second, economic cooperation with Taiwan. On 12 November, the Prime Minister stated that Malaysia had requested that the MTECC meeting be continued and that existing investments were not facing problems based on MITI's review at that time. However, business continuity does not guarantee new investment. When can the MTECC be resumed, and what is the status of the review of the investment agreement made since 1993, more than 30 years ago? The Taipei Representative in Malaysia, Dr. Lien Yu-Ping, has stated that the old framework is insufficient for the protection of intellectual property, technology transfer and investment through third countries. Therefore, this reform is important to attract more high-value activities to Malaysia. Honourable Chairman, next I refer to Item 020200 – Industrial Development together with Item 030700 – Malaysia External Trade Development Corporation (MATRADE). With regard to the Muar furniture industry, which is a very important industry that forms the backbone of the economy around Muar District. According to MITI's reply in October, furniture exports to the United States for January to September 2026 fell by 19.2 per cent to RM3.7 billion. So, what are the efforts to open alternative markets? I request that MATRADE state the number of Muar furniture companies assisted, the total assistance and the value of orders successfully obtained through these efforts. In terms of manpower, what is the decision on the proposal to extend the employment period for skilled foreign workers beyond 12 years of work experience? MITI also needs to clarify the status of the requirement of a ratio of four local workers to one foreign worker, as well as the transitional arrangements for the furniture industry. Honourable Chairman, automation requires capital and time. Under Item P.24, Item 0020, how many furniture factories around Muar District have received this financing and what are the obstacles to their applications? Last July, the Deputy Minister announced that there was approval in principle for the MADANI Digital trading platform, the furniture industry centre at Muar Furniture Park and a special working group to deal with unfair competition...
[Bangun]
What is the specific progress of these three initiatives? What are the preparations of the industry centre by 2027 ahead of the 2028 Budget financing proposal? When can the digital platform be joined, and what action has the working group taken on industry complaints?
At the same time, for automation initiatives, I suggest that the MITI side, apart from financing, should also carry out an audit, namely an audit of the level of automation of an industry. This is because we know that everything has its limitations, its boundaries. This is a natural fact that we cannot avoid, and if we acknowledge that an industry has reached the limit of automation, it means the remaining productivity must be addressed or covered by human resources. So, if that is something that cannot be avoided, I ask, I ask that MITI be flexible and open to certain industries. In this context, it is especially the furniture industry around the Muar District, so that they may acknowledge that they have reached the maximum or optimum level of automation and be allowed, where there is an urgent need, to bring in manpower, especially foreign workers. In this context, the Minister has answered many times, I know. However, we must understand one fact: at one point, KESUMA announced that the unemployment rate in our country is very low, lower than three per cent. This means almost all Malaysians, almost all Malaysian citizens, already have jobs. If we force these industries, these factories, to employ Malaysian citizens, where will they find them? Yet KESUMA says all Malaysians already have jobs. If we do not open up labour, do not allow them to take workers from abroad, how can we ensure that these industries can still operate? I do not want to hear that our Ministers are proposing that these factories move out of Malaysia. In my view, this will be destructive to the economic ecosystem around the Muar District. If these furniture industries or factories move out of Malaysia, it means half of the population around the Muar District will lose their livelihood. Who will bear the livelihood of these families? Will the Minister or Deputy Minister bear it? This is not a responsible answer.
So, I hope we sit down and look for ways out, but not tell these factories to leave Malaysia. This is because I am fed up when I am informed that the Minister, on many occasions, in many dialogues, has said that manufacturers who want cheap labour or foreign labour should go to Indonesia or go to Vietnam. Is this a responsible answer? Certainly not.
Time is up.
I hope you will give flexibility on this issue. So, I ask MITI to set an implementation schedule together with the Muar District Furniture Association so that
entrepreneurs can properly plan their workforce, the investment in machinery, and also obtain more convincing orders so that this industry can continue to grow. That is all, thank you.
Thank you, Honourable Bakri. Next, I invite the Honourable Member for Kubang Pasu.
Thank you, Mr Chairman. Assalamualaikum warahmatullahi wabarakatuh. The Ministry of Investment, Trade and Industry (MITI) has received an operating expenditure allocation of RM1.598 billion for 2027, which is RM94 million higher than 2026. The development expenditure allocation has increased by RM106 million compared with 2026. MITI is a ministry that shows excellent performance year after year. The country's good economic growth is largely the result of MITI's efforts through MIDA and MATRADE in investment and trade respectively. For example, for the period January to September 2026, Malaysia recorded investments totalling RM350 billion, an increase of 20.7 per cent compared with the same period in 2025. Meanwhile, the trade value recorded RM2.991 trillion, an increase of 30.1 per cent compared with 2025. Most importantly, exports increased by 34 per cent and produced a trade surplus of RM232 billion. My warmest congratulations to MITI and the agencies under it, especially MIDA and MATRADE. Head B.24, Item 030300 under the heading strengthening international trade, especially integration of ASEAN cooperation, allocation RM10.9 million. This is a positive effort and I support it because Malaysia should indeed strengthen trade among ASEAN countries, or ASEAN intra-trade, so that we are not overly dependent on markets such as the United States and China. Head B.24 under the heading strengthening quality investment, Item 040000, allocation RM190 million. I ask the Minister to provide clarification on the activities carried out under this heading. Next, Head B.24, Item 020200 — Industrial Development and Competitiveness, RM100 million. I ask the Minister to state what activities and matters will be implemented. Next, Head P.24, Item 00520 — Strategic Investment Fund, totalling RM459 million. An increase of more than RM38 million. With such a large allocation and a significant increase compared with 2026, I ask the Minister to provide clarification on this matter.
Head P.24, Item 00525 – High Impact Project Fund, RM46 million. What exactly is meant by this high impact fund? Which persons or companies will benefit from this fund? Next, Head P.24, Item 00530 – Upgrading and Improving the Basic Infrastructure of Existing Industrial Areas, totalling RM20 million. I support this allocation. If not— if it is more, even better, because it greatly helps existing industrial areas that were developed decades ago. State governments or local authorities are unable to implement projects like these. This includes repairing and upgrading drainage systems that are badly damaged, building new drains to prevent floods, repairing and upgrading street lights and so on. When I was Industry and Investment Exco in Kedah for 10 years, I often applied to MIDA for this allocation. Alhamdulillah, MIDA seldom rejected these applications. Thank you MIDA. For 2025, Kedah received RM4.1 million and for 2026, RM2 million. Thank you once again to MIDA. Head P.24, Item 06000 — New Industrial Master Plan 2030 (NIMP 2030), RM400 million. The question is, which semiconductor companies will obtain this fund? I hope that part of the expenditure will be used for talent development. Items 00531 and 00532. Sarawak Technology Park, RM17 million; Sabah Technology Park, RM39 million. Congratulations, Sabah and Sarawak. I ask the Minister to inform this House where this project will be implemented in Sabah and Sarawak and what types of industries will be developed? Next― just a little more, Mr Chairman. I ask the Minister, what is the impact on Malaysia's position in AI and data centre development due to the resignation issue of Jensen Huang at NVIDIA and issues related to him recently? I also support what was mentioned by Balik Pulau a while ago regarding the bilateral investment with Taiwan, which was signed in 1993. Many things have changed. Therefore, negotiations for a new agreement should be started as soon as possible so that it does not affect relations in terms of trade and also investment with Taiwan. The impact on Malaysia is very great because Taiwan is Malaysia's fourth largest trading partner. That is all. Assalamualaikum warahmatullahi wabarakatuh.
Thank you, Honourable Member for Kubang Pasu. Next, I invite the Honourable Member for Shah Alam.
Assalamualaikum warahmatullahi wabarakatuh. Greetings, greetings of Malaysia MADANI. Honourable Chairman, for Development Expenditure, Head P.24, Item 06000 — New Industrial Master Plan 2030 (NIMP 2030), totalling RM400 million. Among the main agendas of NIMP 2030 is to make Malaysia the preferred logistics gateway to Asia and a regional distribution hub. It is in line with the National Transport Policy 2019-2030 and the National E-Commerce Strategic Roadmap (NESR 2.0). It is worth remembering, Honourable Chairman, that Shah Alam was once known as a manufacturing industrial city. We had electrical and electronics industries such as JVC, Ericsson, Matsushita, health industries such as Johnson & Johnson, chemical industries such as CCM, as well as various fast moving consumer goods (FMCG) industries that contributed to economic development and employment opportunities. However, today we are witnessing a change in industrial structure as some industrial areas in Shah Alam have changed their face and have been flooded— not floods, Honourable Chairman, yes. Flooded by logistics centres, warehousing and distribution. Among the developments that can be seen are the presence of Shah Alam International Logistics Hub, Mapletree Shah Alam Logistics Hub, Maersk Mega Distribution Centre, PKT Logistics, DHL, DB Schenker and many more, including warehousing and distribution centres of local companies. These developments show that Shah Alam is increasingly becoming an important logistics and supply chain hub because of its very strategic location.
However, the growth of the logistics industry also brings different infrastructure needs. It requires roads that can accommodate the movement of heavy lorries, more efficient highway access, waiting and parking space for trucks, lorries and various commercial vehicles, a better drainage system, and digital infrastructure that also supports modern logistics operations. I would like to ask the Minister, what are MITI's policies and incentives to ensure that the development of logistics hubs not only attracts investment, but is also supported by suitable infrastructure and facilities? How does MITI coordinate with the Ministry of Transport, the Ministry of Housing and Local Government (KPKT), state governments and Local Authorities (PBT) to ensure that the growth of these logistics hubs does not burden existing infrastructure, particularly transport networks, traffic control and road quality in Shah Alam, let alone ensure that the safety and well-being of the people of Shah Alam will continue to be protected?
For Supply B.24, Item 05300 – Promotion of Investment and Trade Promotion. I welcome the increase in allocation from RM6 million in 2026 to RM20 million in 2027, an increase of RM14 million, or more than triple. This increase certainly gives MITI room to intensify investment promotion, expand trade networks and enhance Malaysia's attractiveness as an investment destination. I would like to ask the Minister, of the investments approved as a result of MITI's previous promotional activities, what value has actually been realised? And what is the specific objective of increasing this allocation to triple? Next, for Supply B.24, Item 040000 and 040300 – the Quality Investment Enhancement programme. The allocation has decreased from RM191 million to RM189 million. Although the reduction is small, the importance of this programme should not be taken lightly. Malaysia does not merely want to attract large investments in terms of value, but investments that bring technology transfer, productivity improvement, develop local manpower and strengthen domestic industries. We do not want foreign investment that only operates in our country without strong linkages with local companies; rather, such investment should open up space and opportunities for micro, small and medium enterprises (PMKS) to become vendors, suppliers and part of the global supply chain. So, what is MITI's strategy to ensure that approved investments can truly be realised, and what specific mechanisms are there to ensure that local companies, especially PMKS, also benefit from the foreign investment entering this country? Finally, Honourable Chairman, I hope that the national industrial transformation led by MITI can uplift the country's industries to be more modern, high-tech, more productive, and able to offer quality jobs and greater added value to the national economy. Thank you, Honourable Chairman.
Thank you, Honourable Member for Shah Alam. Earlier it was Kubang Pasu, then Shah Alam, now go to Kapar, all my PAC colleagues. Please, Honourable Member for Kapar.
Thank you to the Chairman. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings. I rise to debate the Appropriation Bill 2027 under the Ministry
of Investment, Trade and Industry (MITI), under Heads B.24 and P.24, which have been allocated more than RM1.9 billion. Referring to Item 020000 – Industrial Development and Competitiveness, which has also been allocated RM100.8 million, particularly touching on the policy to attract high-impact industries and data centre hubs that are being approved at a rapid pace, with direct reference to the development of a mega industrial zone of more than 2,600 acres in the Kapar Parliamentary constituency. Mr Chairman, in MITI's eagerness to chase foreign direct investment (FDI) and domestic investment figures, we are witnessing two mega projects side by side at Ladang Bukit Kerayong, Kapar, namely a joint venture of SD Guthrie and Sime Darby Property covering 1.022 million acres — 1,022 acres for heavy industry and logistics, and a joint venture of SD Guthrie, YTL Power and Bumi Assets covering 1,623 acres which also includes the development of a giant data centre. Overall, more than 2,645 acres of agricultural land and estates are being converted into industrial zones and data centres. The question to MITI is, does the approval of investments and coordination through the Data Centre Task Force under MITI really take into account the carrying— carrying capacity, basic infrastructure and local environment, or is it merely chasing investment figures on paper? Three critical issues demand firm answers from the ministry: first, flood risk and drainage capacity. Kapar and Bukit Kerayong are not flood-free areas; they are low-lying areas near the mouth of the Kapar River and flood hotspots that are often affected when heavy rain and big high-tide phenomena occur. Converting more than 2,600 acres of plantation land, which has so far acted as a natural catchment, into concrete surfaces and industrial warehouses will drastically increase the rate of surface runoff. So MITI, what strict conditions are imposed on investments before MITI gives the green light to industrial hubs and data centres of this size? Are investors required to build high-capacity flood retention ponds within their own sites before land works begin, so that the villages in traditional kampung areas and housing estates around Kapar do not become victims of flash floods caused by investments approved by the ministry? Second, hyperscale data centres are well known as facilities that voraciously consume electricity and treated water for cooling systems. At a time when residents and existing industrial operators in Kapar and Meru frequently face supply disruptions and low water pressure, the entry of these giant data centres will drain existing utility capacity.
In Budget 2027, to what extent does MITI require the use of cooling technology, closed-loop cooling, the use of reclaimed water, and the self-generation of renewable energy by data centre developers in Kapar. We do not want the people to bear the impact of rising infrastructure costs or resource rationing simply to accommodate the operations of foreign data centres. Third, what is the actual benefit to local people? The people in Kapar do not live on the figures of billion-ringgit investments. So I demand that MITI explain how many high-skilled job quotas and guaranteed job opportunities are reserved for local children through TVET training programmes and matched with investors in the Kapar industrial zone? Second, what is the supply chain participation mechanism that requires these giant companies to appoint local vendors and SMEs so that economic spillover does not just circulate among big conglomerates? One more thing, Chairman. Head B.24, Item 030600 – Strategic Trade Secretariat. Lynas has signed a four-year rare earth supply agreement with the Government of the United States, which the government has described as a commercial matter of its subsidiary. The government acknowledges that, technically, it is difficult to determine the end use of rare earths because their supply chain is fragmented. This is October 2026, yes. And Malaysia targets the development of non-radioactive rare earth reserves of 16.2 million tonnes valued at RM747.2 billion.
A question to the Minister: the Strategic Trade Act 2010 controls the export of strategic goods. Is rare earth oxide listed as a strategic good under this Act? Second, the government stated that this agreement is handled by Lynas's subsidiary in the United States. Is the rare earth oxide supplied under that agreement processed in Gebeng? Third, the government acknowledges that the end use of rare earths is difficult to determine. Will MITI make it mandatory to have an end-user certificate for every export of rare earth oxide from Malaysia? Thank you, Chairman.
Thank you, Honourable Member for Kapar. Next, I invite the Honourable Member for Putrajaya.
Thank you, Mr Chairman. Item 050400 – Halal Development Corporation (HDC).
Based on the Halal Industry Master Plan 2030 launched in 2023, Malaysia aims to become the world's leading halal industry player. Although Malaysia today is still one of the leading players in the halal industry, if we look at the world situation, the landscape of this industry is changing very rapidly. Other countries in the world are also focusing on the halal industry. And we are aware that countries in the world, many countries, can produce halal products in various segments at much cheaper and more competitive prices. There are also countries that are beginning to produce high-value products that previously had few halal-certified items, but today more and more have halal status. For example, supplements and also pharmaceuticals—pharmaceutical products produced in Australia. If previously there were not many with a halal mark or not many halal products were produced, today more and more of these high-value halal products are being released into the market. Our neighbouring countries, Thailand and Indonesia, also focus heavily on producing halal products, especially food. China has begun to look at what opportunities exist in the context of these halal products, to take advantage of them and gain a larger share of this halal product segment. So, based on the current situation, I would like to ask: how does the government view Malaysia's competitiveness in this halal industry over the short, medium and long term? Which countries are Malaysia's main competitors in specific product segments over these short, medium and long-term periods? And apart from that, Mr Chairman, that relates to global competition. And one of the strengths of the halal industry that Malaysia has is the Malaysian Halal Certification. Other countries respect Malaysia as a country that has standards for issuing the Malaysian Halal Certificate that are very high. Therefore, when a crisis arises concerning non-halal chicken, chicken that is supplied and slaughtered in an improper manner, dead chicken. When this crisis occurs in Malaysia and we see more and more of these issues being raised each day, it will certainly affect the integrity of the halal supply chain in Malaysia. Therefore, I see that MITI, especially through the Halal Development Corporation (HDC), needs to play a more comprehensive role in helping other agencies and other ministries related to the halal industry in Malaysia to collaborate and build a more comprehensive framework. If the issue of dead chicken continues, it will certainly affect the confidence of the global halal industry in Malaysia. Therefore, if we look up to today, I still emphasise how important it is for the relevant agencies to name the companies involved in
producing dead chickens or processing these dead chickens. Because we want to show that we are firm. Until today— Mr Chairman also knows, Mr Chairman raised the same matter. Until today, there is still no name of any company that processes these dead chickens. If this continues, we are sending a signal as if we are protecting the companies involved in processing these dead chickens. Therefore, I request that this matter be looked at more thoroughly. Next, my second point, Mr Chairman, briefly, 020800 – Malaysia Productivity Corporation (MPC). I would like to touch on the role of MPC. I would like to ask what role MPC plays in the context of helping the government ensure that everything related to the latest technology, related to AI, can be used in this public sector to increase the productivity of civil servants? We see that many tasks in this public service are sometimes done repeatedly. If you want a form, first you have to fill it in, send it to this ministry, and fill in the same form again. This is what our people face. And officers also have to go through the same process. So, I want to ask about MPC's role in ensuring that digital technology and also AI can be used to strengthen productivity in this public sector. How does MPC view the processes, the business processes in every ministry, to see where we can use AI, where we can use digitalisation, so that the repetitive burden of tasks among government staff can be reduced. And for places where we have simplified processes through the use of AI, we can use these government staff to carry out other services for the people. So, this will affect not only the productivity of civil servants, but also Malaysians in the context of dealing with the government. Thank you, Mr Chairman.
Thank you, Honourable Putrajaya. I agree with what was said earlier about the dead chicken. Next, I invite Honourable Batu Gajah.
Thank you, Mr Chairman. Batu Gajah would like to touch on three main matters related to MITI in ensuring that the country's economic growth truly benefits the people and local enterprises.
For the period from January to September 2026, Malaysia recorded approved investment of RM350.4 billion, an increase of 20.7 per cent compared with the same period the previous year. This investment involves 4,387 projects that are expected to create 152,090 job opportunities. The source is Malaysian Investment Development Authority 2026. This figure is indeed encouraging. However, the success of attracting investment should not be measured solely by the amount of capital that comes in. What is more important is the extent to which the investment has an impact on the domestic economy. Mr Chairman, first, I would like to refer to Item 020200 – Industrial Development. In ensuring that foreign investment also strengthens local companies, Batu Gajah is of the view that local companies, especially small and medium enterprises, need to be given greater opportunities to become part of the country's industrial supply chain. When multinational companies open factories and operate in Malaysia, the benefits should not be limited to large companies alone. Local enterprises must also have the opportunity to supply materials, components, services and expertise to that industry. The implementation of the New Incentive Framework or NIF, which emphasises the creation of high-income jobs and the strengthening of the domestic supply chain, is a positive step. However, the question is, what monitoring measures are carried out by MITI to ensure that companies receiving government investment incentives also open business opportunities to local vendors and enterprises? Second, I refer to Item 010200 – Strategic Planning Policy. In the effort to create industrial growth that translates into increased wages and quality of employment, Batu Gajah wishes to stress that industrial development should not only focus on increasing companies' production and profits. Local workers must also enjoy the fruits of such growth. Under the New Industrial Master Plan 2030, the government has set a target to increase the median wage in the manufacturing sector to RM4,510 by 2030 compared with RM1,976 in the 2021 base year.
[Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) chaired the Committee] This target is important, especially as the industry moves towards the development of automation and new technology. Local workers need to be given the opportunity
to improve their skills so that they do not merely fill low-skilled jobs, but are able to take up jobs that offer better income and career prospects. Therefore, what is MITI's strategy to ensure that investment in the manufacturing sector truly produces quality jobs and increases wages, especially for local workers? Mr Chairman, I— the third is referring to Item 020100 – Trade and Industry Support in strengthening the competitiveness of local companies in the international market. In the uncertain state of the global economy, Malaysia needs to continue expanding export markets and helping local companies penetrate those markets. At the same time, the establishment of international trade standards also poses challenges to Malaysian exporters. Among them is the implementation of the Carbon Border Adjustment Mechanisme (CBAM) by the European Union since 1 January 2026, which involves sectors such as iron and steel, aluminium, cement, fertiliser, electricity and hydrogen. Trade requirements that increasingly emphasise sustainability can become a major challenge for small and medium enterprises that have limited financial resources and expertise. Therefore, government support cannot stop at efforts to promote Malaysian products abroad. Local companies also need to be helped to meet international standards and increase their export capacity. The question is, what specific forms of assistance and support are provided by MITI to ensure that local enterprises, especially SMEs, do not fall behind in meeting international trade standards and penetrating new export markets? Mr Speaker, in conclusion, Batu Gajah is of the view that MITI's success should not be assessed solely on the basis of the amount of investment successfully attracted into our country. Rather, that success should be seen through the opportunities provided to local companies, the increase in workers' incomes and the ability of Malaysia's industry to compete at the international level. We want Malaysia to be not merely an investment destination, but a country capable of developing local industries, providing quality jobs and ensuring that the people also enjoy the fruits of the country's economic growth. That concludes my speech, thank you.
Thank you, Honourable Batu Gajah. Next, the last debater, Honourable Puncak Borneo.
Thank you, Dato' Sri Chairman. I would like to touch on four important items under the Ministry of Investment, Trade and Industry, particularly regarding efforts to attract quality investment, strengthen the digital economy and develop the country's aerospace industry, with special attention to the potential of Sabah and Sarawak. First, Item 040100 – Investment Policy and Trade Facilitation. I would like to stress that the success of attracting investment is not merely measured by the value of approved investment, but by the extent to which that investment is realised and provides benefits to the local economy. I would like to know what MITI's mechanism is to ensure that incoming investment also creates opportunities for local companies, especially SMEs in Sabah and Sarawak, through vendor development, technology transfer and opportunities to participate in international supply chains. I also hope that trade facilitation will be made easier through an integrated digital system to reduce bureaucracy, logistics costs and the period for approving cross-border trade. Second, Item 040200 – Digital Economy. What should be the catalyst for industrial transformation is not only focused on the development of data centres and telecommunications infrastructure. I propose that MITI place emphasis on the development of artificial intelligence (AI), Internet of Things, automation, big data analytics and semiconductor technology to increase productivity and the competitiveness of local industry. For Sarawak, the advantage of renewable energy resources, especially hydropower, can be harnessed to attract digital industry investors as well as high-technology manufacturing. Third, Item 050600 – Malaysia National Aerospace Industry Corporation (Perbadanan Industri Aeroangkasa Kebangsaan Malaysia), also known as NAICO. I would like to draw the House's attention to a very interesting technological development in China. On 14 November 2026, the commercial electric aircraft CE25A, produced by the Commercial Aircraft Corporation of China, also known as COMAC, successfully carried out its first test flight with a pilot. This 10-tonne aircraft can carry 19 passengers, has a cruising speed of 300 kilometres per hour and a targeted operating range of up to 400 kilometres. The test flight covered a distance of 60.4 kilometres with a time of 16 minutes 38 seconds in the air. This is an indication that the global aviation industry is moving towards electric technology, short-haul flights and more sustainable air transport. Although the CE25A is still undergoing certification, it cannot yet be considered
a commercial aircraft in operation, this development opens up space for Malaysia's aerospace industry. I propose that Sarawak be considered as a hub for aerospace and regional aviation industry development. With strategic collaboration between MITI and NAICO, the Sarawak State Government, higher education institutions and international industry players including COMAC, Sarawak has several strategic advantages. Its geographical location is close to Indonesia, particularly Nusantara, as well as the Southeast Asian market, and it has hydropower resources that can support the development of manufacturing and low-carbon aviation technology. There is potential for developing skilled manpower in aerospace engineering, avionics, battery systems and aircraft maintenance, opportunities to develop the maintenance, repair and overhaul (MRO) industry, aircraft component manufacturing, aviation electronic systems and technical training. Indeed, the proposal to make Sarawak the national aerospace hub was raised by MITI in July 2024. This means that we are not starting from zero, but need to accelerate the implementation of this. Fourth, Item 050300 – Investment and Trade Promotion and Facilitation. According to the performance of Malaysia's aerospace industry in 2025, this sector generated approximately RM32.5 billion in industry revenue— I request two minutes, Dato' Sri Chairman.
Baik, silakan.
And it provides more than 35,000 high-skilled job opportunities. The target under the Malaysia Aerospace Industry Blueprint 2030 is around RM55 billion in industry revenue and 32,000 high-income jobs. This figure shows that aerospace is a high-value industry capable of contributing to the country's economic growth. Therefore, I propose that MITI and NAICO hold specific investment promotion missions to the 'states' of China, South Korea, Japan and other countries that produce aviation technology in order to attract investors to Sarawak. I would also like to ask the ministry: what concrete plans do MITI and NAICO have to make Sarawak the national aerospace hub, particularly in the MRO sector, component manufacturing and skilled manpower training? And secondly, is MITI prepared to explore technology and investment cooperation with COMAC to develop the electric aviation economy and regional aircraft in Malaysia, including the potential to use this technology to improve air connectivity between the interior areas of Borneo? Finally, Dato' Sri Chairman, I believe Sarawak not only has the potential to be an energy supplier to the country, but also has the opportunity to become
an important player in the digital economy, high-technology manufacturing and the aerospace industry in the future. We should not only be using technology developed by other countries, but we also need to build our own capabilities, attract strategic investors and produce local skilled manpower.
I hope MITI can translate this potential into a clear action plan so that Sarawak also becomes part of the country's high-technology industry value chain. With that, thank you. May God bless you.
Thank you, Honourable Puncak Borneo. The Minister of Investment, Trade and Industry is invited to reply.
Thank you, Mr Speaker. Good afternoon, greetings of peace, Malaysia MADANI greetings. Thank you to the 13 Honourable Members who took part in the debate on the Supply Bill 2027 at the Committee Stage, which was debated in this august Dewan Rakyat. My highest appreciation also goes to all views, suggestions and proposals raised concerning the MITI ministry during the debate that took place just now. As the time given is limited, I will try to give as clear an explanation as possible for the issues raised, and if there are questions requiring detailed explanation, I will provide the explanation in writing. For Honourable Members whose debate questions I am unable to answer here, MITI will reply in writing. Okay, I would like— several Honourable Members have raised the issue of REE. Honourable Machang, Jerantut and also Kapar asked about the issue related to raw REE. To answer the question from Machang— cooperation with France in the mineral sector aims to create a sustainable value chain and build technological expertise within the country. It is not an exclusive surrender of the country's REE resources to any single party. For information, the government, through the Ministry of Natural Resources and Environmental Sustainability (NRES) and the Minerals and Geoscience Department (JMG), has implemented flexibility for the export of raw REE through guidelines for considering applications
for the export of raw rare earth elements for the purpose of developing the domestic industrial value chain, which took official effect on 1 October 2026. The flexibility to the moratorium policy on the export of raw REE materials is limited to research and development (R&D) activities and processing only. I would like to...
May I interject, Deputy Minister? On REE.
Ya.
Because here we find that the mining or extraction of REE is being carried out by the NRES ministry. MITI is only responsible from the midstream to the downstream. So, there are two different ministries. So, is it necessary, Deputy Minister, for us to set up a task force or a specific agency for REE, because REE, as a critical mineral, is projected at 16.1 million tonnes, a very large amount, and this will bring great returns to the country. Is it because two different ministries handle this REE?
Deputy Minister, may I? Earlier I also spoke on the same matter. However, the answer is, how much revenue does the Perak State Government obtain and how much does it receive from the Federal Government? And is it true, Minister, that this export is only for research or for commercial purposes? I request a definitive answer.
Okay, thank you, the Honourable Member for Balik Pulau and also Jerantut. To answer Balik Pulau, there is indeed a task force covering everything, chaired by the Minister of NRES and MITI, and various other ministries and agencies are also involved. To answer Jerantut's question, I think it would be better directed to NRES, because within MITI we are from midstream to downstream, not in terms of exporting raw materials. Okay, for the data centre industry that was asked about by Kepong, Kepong is not here, is he? Okay, for Jerantut's information, all data centre companies that apply for approval from the DCTF team after October 2025 must submit a roadmap plan for 30 per cent local content before their projects are approved. Accordingly, the Malaysian Investment Development Authority (MIDA) has a database that gathers all local companies that have the potential to support data centre development. This initiative will facilitate data centre companies in finding and matching their needs with suitable local suppliers
suitable. SMEs can also enjoy investment contracts in this data centre industry because there is no specific threshold on the size of local companies. Okay, in response to the latest control rules introduced by the United States, for the Honourable Member for Machang. Machang is not here, is Bakri here? Bakri is here and Kubang Pasu is here. MITI is working together with the Royal Malaysian Customs Department and the relevant enforcement agencies to determine whether any chips brought into Malaysia, from or through Malaysia, have been re-exported to other countries and whether such re-exportation was carried out in accordance with the law. Malaysia will conduct its own independent review in accordance with Malaysian law and based on the available evidence. MITI will continue engagement with industry players to identify the level of exposure, assess the implications for the operations and exports of local companies, and provide guidance on export control compliance requirements. This step is important to ensure that the local semiconductor industry continues to maintain access to international markets, competitiveness and its position in the global semiconductor supply chain. The Minister of MITI has also conveyed a firm message that data centre operators in Malaysia must comply with United States regulations if they wish to use advanced AI chips from that country. He— the Minister is currently at APEC in China, in Shenzhen; he has commented firmly from China, in Shenzhen. For the information raised by the Honourable Member for Kapar, the data centre task force, approvals to ensure sustainable data centre development: companies are encouraged to use alternative water sources such as reclaimed water, harvested rainwater, groundwater and river water to support data centre cooling systems and not affect the water supply for other sectors and domestic use. In addition, companies are encouraged to use waterless cooling technology. For the issue raised by several Honourable Members regarding ART— Malaysia and the United States signed the Agreement on Reciprocal Trade— Agreement on Reciprocal Trade on 26 October 2025, during the– 47th ASEAN Summit held in Kuala Lumpur, during the official visit of the President of the United States, Donald Trump, to Malaysia. To date, the ART has not yet come into force following the decision of the Supreme Court of the United States, the Supreme Court of the United States, in February 2026, which struck down the implementation of reciprocal tariffs under the Akta Kuasa Ekonomi Kecemasan Antarabangsa iaitu International Emergency Economic Powers Act (IEEPA).
Accordingly, the United States side will amend the references to IEEPA and the reciprocal tariffs contained in the agreement and submit an amendment protocol to Malaysia as soon as the document concerned is finalised. Malaysia is waiting for that amendment protocol before taking further action. The ART stipulates Malaysia's commitment not to prohibit the export of critical minerals to the United States and to abolish the export quota of rare earth elements to the United States. This article also provides for Malaysia's commitment to accelerate the development of the rare earth and critical minerals sector through cooperation with United States companies, encourage the supply of rare earth magnets to the United States on terms mutually agreed, and not impose restrictions on the sale of rare earth magnets to the United States...
Dato' Sri Mr Speaker, may I ask the Minister to give way, just a minute?
Yes, I will finish and I will give way....
Okey, alright.
...Generally, the ART does not impose any restriction on Malaysia to establish or continue cooperation in the field of critical minerals and rare earths with any country. The provision also does not contain any stipulation requiring that cooperation in that field be carried out exclusively with the United States, no. Nor does it require Malaysia to obtain prior consent or approval from the United States before entering into any form of cooperation in the field of critical minerals and rare earths with other countries. So what the Member for Machang said is not correct. Accordingly, Malaysia retains room to establish cooperation with other countries in the field of minerals, critical minerals and rare earth elements (REE), subject to the laws and policies of Malaysia in force. Kubang Pasu.
Thank you, Honourable Minister. Just a little. Recently the Democratic Party won big in the midterm election the control Congress and also Senate. Will their victory have an effect on the ART that we have concluded between them— America and Malaysia?
Thank you, Kubang Pasu. I think the whole world is watching the latest developments in the United States. What the reality is, is
the President is still Donald Trump, and whatever the politics, we have to wait and see. Okay, relating to— the Honourable Member for Balik Pulau, Bakri and also Kubang Pasu, who once served in Taipei, yes, have raised the issue of trade relations between Malaysia and Taipei. Investment: based on investment data up to June 2026, a total of 1,737 manufacturing projects with Taiwanese participation have been implemented, covering investments worth RM34.3 billion. These projects have generated significant economic impact by creating 234,660 job opportunities across the country, thereby placing Taiwan as the tenth largest investor in Malaysia. The Malaysia-Taiwan Economic Cooperation Committee (MTECC), which was postponed in October, will be held after all working groups have held their meetings. There are four working groups, yes— working groups under MTECC, namely the Trade Working Group, the Investment Working Group, the SME Development Working Group (PKS), and the Business Advisory Group. MITI has informed the Taipei Economic and Cultural Office in Malaysia (TECO) that Malaysia, as host for the 11th MTECC meeting, will hold the meeting after the Investment Working Group meeting, the Investment Working Group, takes place. For information, MITI is carrying out an evaluation and comparative study on proposed enhancements to the Investment Promotion and Protection Agreement, Investment Guarantee Agreements (IGA) between Malaysia and Taiwan, taking into account developments and approaches adopted in Taiwan's investment agreements with other countries, including Vietnam, Thailand, the Philippines and India. In this evaluation process, MITI also obtains views and input from relevant government agencies and stakeholders, including the Attorney General's Chambers (AGC) and Bank Negara Malaysia, to ensure any proposed enhancements are thoroughly examined. At present, the IGA signed in 1993 remains in force and there is no problem that— investment has increased, trade has increased, including what Kubang Pasu said earlier, trade has increased by 88 per cent. So, this shows that the IGA that has been applied all this time remains in force and is working well. In this evaluation process— okay, Malaysia is always committed to creating a conducive investment environment and providing confidence to foreign investors.
However, any consideration regarding the enhancement of this IGA must take into account Malaysia's national interests, foreign policy and diplomatic stance.
Deputy Minister, may I interject? I understand that the IWG— Investment Working Group has already been cancelled or suspended by Taiwan— in news reports issued in Taiwan. It is not us who did not want to hold it, but we were asked by the TECO side to cancel it. So, I want certainty because earlier the Deputy Minister said the MTECC has not held a meeting because the IWG is still ongoing. So, usually the IWG comes first, then the MTECC. So, this IWG has been cancelled or suspended by Taiwan. Is that true, or did we ask to postpone it, which one? I am not sure.
I think from the Taipei side, they have cancelled it, as reported, yes. Their Investment Working Group has not— has cancelled, but Malaysia's position remains to cooperate if they agree. And for the MTECC, we will implement it after all the working groups are completed. Okay, wait a moment. Kepong is not here. Okay, the Honourable Member for Kubang Pasu. The Strategic Investment Special Fund (DKPS) was approved under the Budget 2022 initiative with an initial allocation of RM2 billion for a period of five years under the Twelfth Malaysia Plan, focusing on the semiconductor sector. This semiconductor sector was chosen because we want to raise the ceiling, raising the ceiling, of investment and raising the floor as well. Infrastructure investment that attracts high-value activities. High-technology value chain, yes. Although the DKPS focuses on the provision of infrastructure and ecosystem facilities, the existence of this project directly raises the growth ceiling of the national semiconductor industry, namely from the back-end processing phase, front back end, to integrated circuit design, IC design, and fabrication manufacturing, namely advanced wafer fab. Technology transfer and the emergence of talent, yes. Companies required to carry out technology transfer, and the presence of this high-technology facility, create a natural need for local talent to master advanced engineering expertise without the government having to allocate separate training funds. And second, raising the floor, yes, high-income job opportunities and social mobility for local talent. And third, the third is strengthening governance, governance framework. Management of public funds based on investment returns and compliance with commitments. The increase in the allocation for 2027 takes into account the need to cover existing payment commitments and ensure payments to recipient companies can be made on schedule. The higher total allocation
compared with the previous year is also intended to ensure the continuity of project implementation in fulfilling the government's agreed financial commitments. This year, 2026, this project is not yet ready, but in 2027 they are ready and want to take off, so the allocation has been increased for the information of Kubang Pasu. As for the High-Impact Fund (HIF), the HIF was first introduced since Budget 2000, in the year 2000, under the Eighth Malaysia Plan (RMK-8) as part of a special incentive package to offer special incentives.
The objective of the HIF is to offer grants as part of the incentives offered to attract strategic local and foreign companies in the manufacturing and services sectors to locate projects in Malaysia. This fund is also needed to compete with other countries in the region and more developing economies in offering competitive incentives to targeted companies. Okay, for the Honourable Member for Jerantut. Okay, regarding the halal PMKS automation programme of HDC, yes. For the Honourable Member's information, the ministry, through HDC, is implementing a programme for the empowerment and intervention of halal entrepreneurs among PMKS to help local halal companies modernise and automate their production processes. Assistance is provided through facilitation of the procurement of machinery and equipment, packaged together with technical and entrepreneurship training. This programme is exclusively dedicated to PMKS that produce halal products and does not involve large companies. The programme is implemented in a targeted manner at the national level based on applications and the level of readiness of companies. In 2026, a total of 15 PMKS have received benefits. For 2027, this programme will be expanded to 35 PMKS, bringing the total to 50 PMKS for 2026 to 2027, and the production capacity of the recipient companies is projected to increase by 50 per cent. This programme is also strengthened through grants of up to RM50,000 for each company under Budget 2027 to cover compliance costs, facility upgrading, machinery and equipment, worker training and technical advisory services. The ministry encourages halal PMKS in the state of Pahang, including in Jerantut, to apply for the additional 35 places in 2027, and HDC will expand its outreach together with the state agency for that purpose. The Honourable Member for Padang Rengas asked about enhancing industrial competitiveness through the allocation of RM2.6 million related to Environmental, Social and Governance (i-ESG). For the information of the Honourable Member for Padang Rengas, is he here? Okay. The government, through MITI, launched the i-ESG framework on 2 October 2023, which is expected to be able to align i-ESG standard requirements with the demands of the green global supply chain
The i-ESG framework is Action Plan 3.14 under the Industrial Master Plan 2030 to launch the ESG framework and transition programmes under Mission Three: Towards Net Zero. The i-ESG framework itself is based on the i-ESG components, namely standards, capacity building, financing and market mechanisms. Each component has a rational strategy for enabler outcome strategies as well as an action plan by implementing agencies. Taking into account the diversity of industry readiness levels, the implementation of the i-ESG framework will be carried out in phases. Phase one is just transition between 2024 and 2026. This is followed by phase two, accelerate ESG, between 2027 and 2030. I would like to inform that this i-ESG is very, very important because if we want to export anything to other countries, especially to Europe, ESG becomes a priority. So it is important that these PMKS are prepared and they must work together with their Tier One, maybe their Tier Two or vendor, they must cooperate with their parent company to be ESG ready together.
1 and the employment status of foreign workers in line with the optimal level of automation in the furniture manufacturing subsector. For the information of the Honourable Member for Bakri, starting from 2016, MIDA has set a worker ratio requirement of 80:20— 80 per cent local workers and 20 per cent foreign workers as one of the conditions for manufacturer licence approval. However, compliance with this requirement has been deferred several times, taking into account the labour needs of industry. Accordingly, MITI has extended the deferment of compliance with this requirement until the full implementation of the Multi-Tier Levy Mechanism. As the regulatory agency for the manufacturing sector, MITI is responsible for examining and evaluating applications for foreign worker employment quotas based on the actual needs of industry and the policies and criteria set by the government. At present, the assessment of applications is guided by a one-to-one ratio of one local worker to one foreign worker for non-export-oriented companies, and a one-to-three ratio (1:3), one local worker to three foreign workers, for export-oriented companies, as approved by the Cabinet Committee on Foreign Workers and Undocumented Immigrants. The Honourable Members for Batu Gajah and also Jerantut asked about the NIMP 2030 target. For information, under the NIMP there is no specific target set for the total amount of investment. Instead, NIMP 2030 places emphasis on the growth of GDP value added, the creation of employment opportunities and the increase in workers' income in the sector
manufacturing and also economic complexity. That is our target so that our country moves towards becoming a developed nation. Okay, after three years of implementing NIMP 2030, the manufacturing sector continues to show positive development as follows: GDP value added of the manufacturing sector increased by 7.3 per cent or RM7.1 billion to RM104 billion in the second quarter of 2026 compared with the same period in 2025. This increase reflects continuous growth and strengthening of the country's manufacturing economic activities. Employment in the manufacturing sector also recorded an increase of 3,000 persons to 2.838 million persons in the second quarter of 2026. The median wage of the manufacturing sector also increased from RM2,659 in 2024 to RM2,775 in 2025, an increase of 4.3 per cent. The Honourable Member for Tuaran is not here, okay. Okay, the Honourable Member for Balik Pulau asked about MEUFTA, EUDR and CBAM. MITI, as the lead negotiator for the Malaysia-European Union Free Trade Agreement (MEUFTA), together with other relevant ministries, is always committed and continues to strive to ensure that every negotiation safeguards the national interest and sovereignty while preserving the country's policy space and prioritising the welfare of the Malaysian people. The MEUFTA negotiations are being actively carried out...
Honourable Minister, Puncak Borneo. A small interjection.
Okay, okay. After this I will...
Saya...
...Give way to Shah Alam. Then, after that, Puncak Borneo, okay. So, we will continue working with the European Union towards concluding the negotiations in 2027 in line with the target that has been set. Shah Alam, yes...
Before that, Deputy Minister, I would like to interject briefly about that MEUFTA. Only five chapters have been signed, out of 21 chapters. I request that the Select Committee (JKPK) on International Trade be given the opportunity, before ratification, to go through the 21 chapters that have been agreed between MITI and MEUFTA. Sorry, with the EU...
Okey.
If the negotiations have been completed, we will engage with JKPK. For Shah Alam, MITI has carried out 12 TTIM, some of which were held during the intervals of the Prime Minister's official visits. All the commitments
obtained during those trade investment missions are now at various stages of implementation. For 2027, MITI will continue to emphasise the promotion of Malaysian goods in traditional markets and continue to emphasise the promotion of Malaysian goods in traditional markets, and to maintain and identify new high-technology investment potential from source countries suitable to the identified strategic industries. A total of 14 TTIM have been planned for implementation, covering traditional trading partners such as the United States of America, China, Japan, the European Union, and potential countries such as the UAE and Türkiye. For Puncak Borneo, yes, last of all...
Honourable Minister, Honourable Minister, Shah Alam.
Ya.
Earlier, I asked a specific question about the direction of the Asia Pilihan logistics gateway, in which Shah Alam is actively involved. So, if there is no answer yet, I request a written reply. Thank you.
Yes, I will give a written reply, because the officers are still— this is a very specific question, yes. For Puncak Borneo, Puncak Borneo wishes to attract quality investment to Sabah and Sarawak, and also vendor localisation. I would like to make a suggestion like this. Many Honourable Members, including Padang Rengas, are increasingly keen to attract investment to more rural areas. I see that actually many states often go overseas for trade investment missions. Yes, Sarawak has Invest Sarawak, Perak has Invest Perak, and they often go abroad to attract investment. I think it would be good for them to consider that state investment missions are also necessary, domestic trade missions. For example, in Ipoh. Ipoh has many bigger industries. Perhaps for Padang Rengas, Invest Perak can visit those companies to attract them to, if they want to expand, they can expand food processing in Padang Rengas. The same goes for Sabah and Sarawak. For Sarawak, perhaps, let me give an example, if they want to expand semiconductors, they can go to Penang and also to Johor Bahru or KL to ask that certain processes be developed in the state of Sarawak. So, I think internal trade missions are important because some companies really want to find— it is difficult to get workers, yes. They may want to look for a cheaper place with resources, with renewable
energy, with cheaper land. So it is important not to simply go overseas only.
Honourable Minister. Okay, thank you for the explanation, but to what extent can the Federal Government, the MITI, facilitate this? Because I understand there are initiatives from every state government, but sometimes these things get stuck or held up at the Federal level. So, I think coordination needs to exist between the state governments and the Federal Government, because sometimes this is something that people have mentioned in the past, with permission. I am one of the Members of the Select Committee on International Trade and International Relations. From my observations and from my exposure, sometimes these things present an opportunity. State investment bodies ask for investment, but sometimes when it reaches the Federal level, it gets a bit stuck. So, what is— what is your assurance to ensure that MITI gives full support when these people have the opportunity, with permission? Thank you.
Okay. For MITI and also MIDA, it is actually the investor's right to choose the location. We actually facilitate; we do not choose for them— you go here, you go there, no. Investors are very sophisticated, and they are very— they already know about the ecosystem. They already know, they have already done what are called the necessary homework. So, for this reason, it is the investor's money and we cannot say, you go here, you go there. Because this is their money. They look for factors suitable for them. In terms of, perhaps some want to look for skilled workers, some want to find an ecosystem, some want to be close to their customers, and some want to find renewable energy. So, each has its own preferences, and we at MITI and also MIDA only facilitate. So, Mr Speaker, I have answered all the Honourable Members who are in...
[Speaking without using the loudspeaker]
Putrajaya. Okay, regarding the integrity of the halal network in Malaysia, I think it is better to ask JAKIM because they are the ones who have the enforcement. From MITI's side, we facilitate investment and also what is investment and development of the halal industry, not…
Yes, what I meant earlier, what I meant earlier was the impact of what is happening in Malaysia, the integrity of the halal supply chain just now, on the halal industry. That was my question earlier, because we want to be the leader in the halal industry and we have to compete with other countries in the world. Suddenly, there is an issue in our own country as well.
So, my question earlier was about how HDC views the impact of what is happening on the halal industry in the context of Malaysia competing on the world stage. Thank you, Minister.
Of course we take note, and usually in every industry there are, of course, bad actors, and we must enforce and we must improve. But generally, Malaysia has very high halal standards, and indeed our Halal Certificate is of a high standard. So, this certainly earns the confidence of investors from around the world, and MITI usually finds that when we promote halal investment, they are very confident in Malaysia and our Halal Certificate, and also that the industry is very viable. So, I think there are one or two bad actors that we must enforce against.
My suggestion to MITI, through HDC just now, is that MITI should also play a role, to raise awareness of what is happening in Malaysia and to lead other agencies and ministries to realise that what is happening may seem simple, but it affects the image of the Halal Certificate Malaysia, which is recognised around the world. Because if it is affected, the whole industry will be affected, and the Malaysian halal industry will be affected. Thank you.
Thank you for all the suggestions, views and also criticisms directed at MITI. As a conclusion to the winding-up speech on the Committee Stage of the 2027 Budget debate, the support and views of the Honourable Members will always be welcomed in our efforts to strengthen the country's economy so that it becomes more sustainable and prosperous, in order to realise the aspiration of Malaysia MADANI. That concludes my speech. Thank you, Mr Speaker.
Thank you, Honourable Minister. The question is the sum of RM686,332,800 for Head B.24, Operating Expenditure Estimates 2027; accordingly, part of the Schedule shall be agreed to. [The question was put and agreed to] [Head B.24 became part of the Schedule]
The question is that the expenditure stated in Head P.24 in the Development Expenditure Estimates 2027 be approved. [The question was put and agreed to] [Head P.24 became part of the Estimates of Expenditure]
[The Sitting of the House resumed] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) presiding]
Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Monday, 23 November 2026. [Gavel struck]
[The House adjourned at 7.20 p.m.]