Johor · 19 August 2018

1st session, 2nd meeting · 187 turns · 21,081 words · official PDF ↗

171 of 187 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.

Announcement from the Honourable Speaker

SpeakerEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi taala wabarakatuh and peace be upon you. (Recitation of selawat). Honourable Members all, alhamdulillah, today is the last day of our meeting. We will continue this sitting without a break as usual. Normally at 11.00 we would have a break, but we will carry on until we finish at midday.

Oral Questions.Questions

SpeakerEN

Honourable Serom, please.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum and peace be upon you. Honourable Mr Speaker, my question number 1. What is the latest status of the government's efforts to introduce a scholarship scheme for the people of Johor?

SpeakerEN

Please, Honourable EXCO member.

Tuan Mohd Khuzzan bin Abu BakarPKR · PHChairman of the Committee on Youth, Sports and Culture · SemerahEN

Assalamualaikum warahmatullahi wabarakatuh, peace be upon you and greetings of hope.

Honourable Mr Speaker, scholarships are awards from the government to students who obtain excellent results and meet the criteria. At present there are Federal scholarships administered by the Ministry of Education Malaysia. Meanwhile, specifically for students in the state of Johor, several scholarships have been introduced, administered by the Johor Education Foundation (YPJ). Apart from the provision of education loans, YPJ also offers scholarship schemes to outstanding Johor children at secondary school, diploma, bachelor's degree, master's degree and doctoral levels.

The following are the types of scholarships offered by YPJ, namely:

1. Scholarships at secondary school level – the Biasiswa Kenangan Dato' Onn with a payment of RM600.00 a year for students from Form 1 to Form 6. 2. Scholarships at diploma and bachelor's degree level, namely the Biasiswa Sukan Atlet Johor, which sponsors Johor state athletes pursuing studies at IPTs in Malaysia, with full tuition fee assistance and also covering living costs, namely RM500.00 a month; 3. Scholarships at master's and doctoral level, namely the Biasiswa Sultan Ibrahim, which sponsors outstanding students of the state of Johor pursuing studies at IPTs in Malaysia, with full tuition fee assistance and also covering living costs, namely RM1,000.00 and RM1,500.00 a month. That concludes my reply, thank you.

SpeakerEN

Honourable Serom, please, supplementary question.

Honourable Mr Speaker, I would like to seek clarification on what the Honourable EXCO member has just stated about the efforts or scholarships introduced by the Johor State Government. In this context, what are the statistics on the recipients of all the scholarships that were proposed or that were mentioned by the Honourable EXCO member just now.

Speaker

Jemput.

Tuan Mohd Khuzzan bin Abu BakarPKR · PHChairman of the Committee on Youth, Sports and Culture · SemerahEN

Honourable Mr Speaker, Honourable Serom, for the information of the Serom side, God willing, we will provide the answer to this in writing. Thank you.

SpeakerEN

Next, the Honourable Benut. Eh, sorry, I apologise... err Bentayan, sorry.

Tuan Ng Yak HoweDAP · PHBentayanEN

Honourable Mr Speaker, my question number 2.

What are the government's plans to improve solid waste management in the state of Johor by harnessing the latest technology?

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Peace be upon you, good morning, greetings of hope. Thank you to Mr Speaker and thank you for the question from the Honourable Bentayan. I am worried Speaker does not like me, so my question does not arise. (Laughter).

SpeakerEN

There was no... there was no malicious intent, okay... (Laughter).

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, Honourable Mr Speaker. Honourable Mr Speaker, the Honourable Bentayan has asked about the government's plans to improve solid waste management in the state of Johor. For the information of this august House, solid waste management is actually now under the administration and jurisdiction of the Federal Government, which indeed has plans to strengthen the solid waste management system in Malaysia, particularly in the state of Johor.

In the state of Johor, 2 disposal sites will be upgraded from sanitary landfills to integrated disposal sites, or, with permission, integrated facilities. These will incorporate the latest systems and technological facilities based on the waste-to-wealth concept, with permission WTE, pyrolysis, anaerobic digesters and so on. To meet and cater for current needs and to prevent the state of Johor from a solid waste crisis, this technology will be implemented at the Selong sanitary landfill and the Tanjung Langsat disposal site.

The state government is committed to moving towards an effective solid waste disposal system through the WTE concept, upholding sustainability value so that when waste is disposed of, it will be processed and the results turned into energy or other materials that can generate income.

Two approaches, namely waste disposal and the production of these outputs, are combined, and the results are then sold and used to benefit the local areas and residents. In addition, the WTE concept is a sustainable solid waste disposal system that is able to generate income, and moreover reduces the State Government's burden in managing solid waste. The implementation of this concept is seen as a long-term approach to overcoming critical and pressing issues at existing disposal sites, such as groundwater pollution, with permission leachate, odour pollution, fires caused by weather, public complaints and also the health of local communities.

SpeakerEN

Please, Bentayan, supplementary question.

Tuan Ng Yak HoweDAP · PHBentayanEN

Thank you, Mr Speaker. What we would like to inform you now is that there is much capacity at solid waste disposal sites in the state of Johor, many of which are close to maximum capacity. As one example, at Bukit Bakri, the remaining period is only 1 to 1½ years, so, I would like to know, what are the short-term measures for the state government to overcome this problem. That is all.

SpeakerEN

Please, the Honourable EXCO member.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you to the Honourable Bentayan for that question. For the information of the Honourable Mr Speaker, the original plan crafted by the previous government, as has been much discussed in this august House for some days in the debates over the past few days, was that everything would wait for the construction of the sanitary landfill at Bukit Payung. Under the original plan, the Bukit Bakri disposal site would be safely closed, as its lifespan had run out, reaching into 2019. However, because of the very strong objections from the residents at the Bukit Payung site, the present government is at the stage of reviewing the construction of the Bukit Payung sanitary landfill. Nevertheless, for the short-term solution for the Bukit Bakri disposal site, we will look for an additional nearby site to cater for the needs around the Muar Municipal Council, as what we call it, as a temporary solution or as a back-up plan should we still have to close the Bakri disposal site next year.

Speaker

Jemput Benut.

Thank you, Honourable Mr Speaker. Honourable EXCO member, congratulations because the government still continues the Waste to Wealth approach as a method of managing solid waste. I would like to get the government's views on the use of technology, which is increasingly becoming a constraint if cost is a problem. Technology is advancing and costs are also falling. So, instead of the sanitary landfills proposed at several sites for waste disposal, what is the Government's opinion on the use of incinerators as one of the methods, which we know are environmentally friendly and are one of the best disposal methods if budget or allocation is not an obstacle. Thank you.

Speaker

Jemput EXCO.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, Honourable Mr Speaker, and thank you, Honourable Benut, for the question raised just now. Actually, for the information of this august House, we now go beyond the concept of Waste to Wealth, WTE, rather than merely mentioning incinerators, which would be a waste. When all waste is sent to be burnt, it is a waste of resources. Therefore, we are in the process of studying where there are several proposals or suggestions that have been sent to my side, and we will take into account not only the construction cost but also the operating cost over the long term.

For the information of the Honourable Member and of this august House, the cost for the construction... the proposal for building this incinerator not only involves concerns about environmental issues, but it actually also has implications in terms of operating costs. What I mean is the tipping fee that will be charged to the Local Authorities. Sometimes, although the construction cost may not appear to be very high, and indeed nowadays I see many parties trying to lobby the government to build incinerators with offers that are so attractive that they can pay for the entire construction cost. However, I have always believed, and the government has always believed, in an English saying, that "there's no free runs in this world", so if someone gives something for free, we must consider what the long-term implications are. Therefore the government always adopts a careful attitude in this matter so that we do not make a decision that will burden the local authorities over the long term.

SpeakerEN

There are still other free things, Honourable Member. Gas... air is still free (Laughter). Please, Senggarang.

Tuan Ir. Khairuddin bin A. RahimAMANAH · PHSenggarangEN

Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, the Honourable EXCO member just now stated about Bukit Payung. I often hear about Bukit Payung. Everyone hopes for Bukit Payung. Actually, we residents of Bukit Payung have been objecting since 2010, a long time ago, and now it is 2018, right, that is 8 years. We should have looked for another place much earlier, and finally I thank the new government, since Pakatan Harapan postponed the Bukit Payung waste disposal centre, which I think is a wise action, one that is good for the people there. And my question is, is this problem, this waste problem, which is always critical, something the previous government did not notice in the past? It has come, it has come to what? It is about to sink everything before we... the Pakatan Harapan government has only now begun to take over these problems from the previous government. My question.

SpeakerEN

Please, the Honourable EXCO member.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, Honourable Senggarang. But it seems perhaps I am not suitable to answer that question. Because the question is directed at the previous government, but nevertheless perhaps I will take a little time to discuss what the issues and problems we face in the matter of Bukit Payung are. Among those, the two issues and challenges we face are, first, objections from residents, to the extent that even among the EXCO members, we also hope that this project will be cancelled. However, now the postponement order for Bukit Payung will mean that construction at Bukit Payung cannot be completed before the Ladang CEP site and also the Bakri site that I mentioned earlier, which will cease operation in 2019. The implication is that solid waste from Simpang Renggam, Simpang Renggam District Council, Kluang Municipal Council, Yong Peng District Council, Batu Pahat District Council and Muar Municipal Council will have no site for disposal. I hope the waste will not all be sent to my house.

As for the financial implications, there is a monthly recurring cost, namely every month there is a cost of RM1 million a month to the contractor for the mobilisation of machinery, overhead costs and site management costs. On this matter, I have received information from the Ministry that the contractor is now attempting to claim these losses from the government. The cost of the Leachate Treatment Plan at the farm, at the Ladang CEP disposal site, which swallowed expenditure of approximately RM3.5 million. And also compensation payments for materials on site, which are estimated to have consumed an allocation of RM6.5 million. In terms of technicality, the Bukit Payung Disposal Site was actually intended to resolve the solid waste management issue in the Northern Johor area. Its lifespan will end at a period, in 2019 or earlier. Among them is the Tangkak District Council, namely the Bekok Disposal Site, which is expected to end in 2020. The Batu Pahat Municipal Council, namely the farm, the Ladang CEP disposal site, and Simpang Renggam, also Kluang, which are expected to end their term in 2019. For the Muar Municipal Council, the Bakri Disposal Site is expected in 2019. So we follow the original schedule. If the date for the Bukit Payung Sanitary Landfill can be completed by 26 August 2019, taking into account the lifespan for the sites I mentioned earlier, then the disposal sites around Johor Bahru Utara can be closed safely, because the issue we face is that, at present, these disposal sites are not sanitary landfills. The failure to complete the Bukit Payung Disposal Site will cause big questions and problems

for the City Councils, Municipal Councils or District Councils that I mentioned earlier. However, the government is always attentive and takes into account all aspects of these issues, and now we have taken into account the objections from Bukit Payung, so it seems we have solved the problem or objection at one site but we have to deal with problems at 3 or 4 other sites. That is the current situation we face.

SpeakerEN

Next question, please Benut.

Honourable Mr Speaker, my question number 3.

Please state the steps and targets of the state government to ensure that the Johor Contractor Development Master Plan can be successfully implemented, and what form of targets have been identified.

SpeakerEN

Please, Honourable EXCO member.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera, good morning. Alhamdulillah, Honourable Benut, thank you. Yesterday I already answered part of question A99. For the information of the Honourable Member, Mr Speaker, among the measures and targets taken by the state government is the establishment of JCCD, as a facilitator and an agency for contractors in the construction industry. So within JCCD there is also a website, and we propose to upgrade it to become a central data hub in the future. In it, we are updating and restructuring contractor registration and assisting with information on procurement systems, machinery and equipment rental, the list of suppliers, with permission, financial advisory services, star rating, that is, the quality ranking of contractors, with permission, the list of past work references, with permission, and information on training offers and seminars. In addition, there were several meetings and interview sessions I held with bodies involved with contractors, namely CIDB, PKK and also YPJ. As for CIDB, my discussions focused more on it. CIDB provides short-term courses, mostly for crane operators, backhoe operators, backhoe drivers, what we call JCB in common terms, and also scaffolding courses (perencah). So these things already existed, from the period before we formed the government. What remains is my emphasis on quality. In the past, from my experience, Mr Speaker, when crane operators and JCB drivers came out, although they had licences, they were not able to operate. So this time we propose that they have what is called industry training, so that they come out with better quality. And when they enter the market, it makes it easier for them to compete in the market, and also, as primary contractors, we get products of higher quality and greater reliability.

Why is that, Honourable Member? This is my experience. When there is no quality, when they go out, our crane machines break down. So this is one of the main emphases we asked CIDB to focus on, and CIDB does actually give a living allowance, but it is not much for participants. There is just one more weakness I see, in terms of the offers. These things sometimes do not reach the ground level. Sometimes these things seem too closed off. So I ask that these be publicised through wider media so that the youths get better information on the approach. Next, PKK. I see that PKK is rather less aggressive in terms of, in terms of adding aggressive contractors, but I want contractor quality. And I have directed PKK to extend the licence periods of PKK. I want PKK to carry out observation or visits to premises and offices of contractor companies, to verify whether the contractors truly exist. Why? Because we do not want the issue to arise that there are too many licence rental issues in the market, or "Ali Baba" companies. So we have directed, I have directed, and I have also given PKK a kind of target that every month it submit to me a report of its observations, so that it can extend the contractors' periods.

Next, regarding YPJ. YPJ is under the Johor state government. I have met informally with YPJ Pendidikan, where I asked that more suitable courses be considered according to market demand, with permission, so that the courses offered by YPJ are truly, as they say, suited to the needs of the construction industry market. So I give an example: at YPJ there is no QS course, and then there is no course on things like oil and gas gas tester and so on. As for this, we have not yet looked at Project RAPID, Honourable Mr Speaker. I myself have also been involved in Project RAPID. There are many course opportunities like these that we should have run at YPJ, so that when our graduates come out, we can supply them to the market for Project RAPID over there. So at present, most of the workers come from outside. And with such courses in place, we hope the children of Johor will have more opportunities to enter the market for such oil and gas projects. Thank you.

SpeakerEN

I invite the supplementary question from Benut.

Thank you, Mr Speaker. I would like to congratulate the Honourable EXCO on his very deep understanding of the construction industry, and also on his confidence in driving this JCCD. Yesterday the government launched the Sustainable Development Plan 2019 – 2030. Programmes such as JCCD, Honourable, are necessary and will certainly be in line with the master plan. So this Contractor Development Master Plan and the Johor Sustainable Development Plan must be aligned. Therefore, where in the Johor Sustainable Development Plan are the eight pillars that include the role of JCCD, so that the Honourable Member can, enabling the Honourable Member to develop many more contractors? So, is one of the eight pillars going to enable the Honourable Member to drive JCCD forward? If not, is the Honourable Member prepared to include the role of JCCD in those eight pillars?

Speaker

Jemput

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Thank you, Honourable Member. Mr Speaker, so in fact the development of these pillars, as the name says, pillars, there are eight of them. It does not mention the development in detail. So, Insya-Allah, we will, we do not have, we do have a plan to include it in there, but we have not announced it in detail. As the name says, just pillars. We will provide the content later, can, Honourable Member? Because as you know, we have only been in office for 3 months. Give us a little opportunity to study it in more detail. As the name says, just pillars. Thank you. And all my views, in fact, we are a new government. We also welcome ideas from the side opposite. Let us work together to develop the state of Johor. So, we are not, it is not necessarily the case that all views from this EXCO are correct. So if we have better two-way relations, I think with this combination we can together develop the state of Johor. Thank you.

SpeakerEN

I call Permas for a supplementary question.

Thank you, Mr Speaker. My question is, does the government have plans to blacklist and freeze contractors who fail in projects awarded to them, such as the Masjid Taman Scientex, where the contractor did not complete the work within the stipulated time? Thank you.

SpeakerEN

I invite the Honourable EXCO. Invited, supplementary question.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Mr Speaker, it seems this question has gone quite far. But I will answer it anyway. In fact, when it comes to these abandoned projects, when we, in fact the best course of action is that JKR, as far as possible, we do not terminate the contractor, unless the project has become very bad, at the site it has stopped moving, there are no workers and so on. In such cases we have to terminate. If we leave it, it will certainly not be completed. But if it is at the final stage, say it has reached roughly 80% or more, even if it is slow and there are still workers working, we still do not terminate; we give an opportunity to complete it. Because termination is not a simple process, it involves legal implications and so on. It is not easy, and termination usually ends up in court disputes. So, ideally, we take a win-win approach so that the project can be completed and saved. But if that is not possible, such as when the project has really become completely stagnant, then we have to terminate. However, the effect of termination is usually that we need to re-tender, firstly because the procurement process takes time. Secondly, with termination we usually cannot achieve the original cost. Anyway, when we bring in a new contractor, they have preliminary items, and in the end the budget will burst. Once the budget bursts, we have to redo the BQ, and we have to make an additional budget. When the additional budget involves the federal government, it takes longer. That is why, it is not the mosque alone, there was also a question that I could not answer, the Masjid Kampung Sawah, the question ranking did not reach me. But I will answer it. This is in fact the root cause why these projects cannot be rescued quickly. Thank you.

SpeakerEN

Next question. I invite the Honourable Member for Tanjung Surat.

Mr Speaker, my question is question number 4.

With the increase in housing and industrial development in Pengerang, is the water supply sufficient to cater for the expected increase in water demand?

SpeakerEN

I invite the Honourable EXCO.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Thank you, Mr Speaker. Mr Speaker, the Honourable Member for Tanjung Surat has raised the question of whether, with the increase in housing and industry in Pengerang, the water supply is sufficient for the expected increase in water demand.

I am pleased to inform this august House that, based on the water demand from the planning permission applications submitted by developers to the Local Authority and the overall concept of the new development submitted by developers to Syarikat Air Johor Ranhill, there is indeed an increase in water demand in the Pengerang area. The new development in the Pengerang area also includes new housing, factories and a theme park development project. The developers have submitted water requirements for the near term, up to about 5 years, of approximately 30 million litres per day, or 30mld.

Therefore, the upgrading works for the Sungai Lebam Water Treatment Plant were proposed, which are being implemented in two phases. The first phase, from a capacity of 40mld to 50mld, was completed in 2017, and the second phase, from 50mld to 81mld, is still in the implementation stage and is expected to be completed in November 2018.

With the completion of the upgrading works for the Sungai Lebam Water Treatment Plant, it will be able to meet the water demand for domestic and industrial use in the Pengerang area and its surroundings. At present, the water supply requirement from the Sungai Lebam Water Treatment Plant is around 46mld. Nevertheless, the need to build new water supply infrastructure will always be studied, depending on the projected water demand, and will be proposed in the business plan of Syarikat Air Johor, which will be submitted to the National Water Services Commission (SPAN) for approval and subsequent implementation by SPAN. That is all, thank you.

SpeakerEN

Tanjung Surat, please go ahead with your supplementary question.

Mr Speaker, thank you to the EXCO for answering. From the answer given, I think that in the foreseeable future, it should be sufficient for now. However, I would like to ask whether there are plans, because even if we upgrade the water treatment plants to increase the supply of treated water, if the existing pipe system is not in good condition, or is not adequate in size, or is too old, it cannot be used effectively. So my question is, with the enlargement and upgrading of these water treatment plants supplying clean water, does the state government intend to replace the old pipes or pipes whose size is no longer suitable for the conditions in Pengerang. Thank you.

SpeakerEN

I invite the Honourable EXCO.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Thank you for the supplementary question by the Honourable Member from Tanjung Surat. Yes, Mr Speaker, indeed if the piping issues are not replaced, it is not only one thing, it cannot withstand pressure. That means when the piping is very old, the water pumped through the piping sometimes cannot, we say it is fully utilised at 100%, because the pressure cannot be withstood, and if we force it, it may burst. And if the piping bursts, that means there is an issue of water supply disruption.

Secondly, if the piping is not replaced, it will also cause water to be lost, which we call NRW, non-revenue water, where in Johor we are at nearly 25%. This will also cause our payback to rise, which will affect, there is a connection, an effect on our water tariff. Therefore, I fully agree with the proposal of Tanjung Surat, and indeed we do have plans to replace water pipes from time to time, including in the Pengerang area. That is all.

SpeakerEN

The next question, the Honourable Member for Senai.

Tuan Tee Boon TsongDAP · PHSenaiEN

Thank you, Mr Speaker, my question is question number 5.

As we all know, the Senai area is equipped with facilities such as an airport, a railway station, an RTC and the Johor Premium Outlet (JPO) shopping centre. What saddens me is that tourists who come to Senai do not have attractive places to visit. Does the Johor government intend to elevate the name of Senai as an Arts and Culture Hub to promote the tourism sector?

SpeakerEN

I invite the Honourable EXCO.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Mr Speaker, thank you to the Honourable Member for Senai for raising this question. Based on the Johor State Tourism Master Plan for 2014 to 2023, the Kulai, Senai and Skudai areas have been placed under the leisure shopping tourism destination cluster, with JPO, Johor Premium Outlet, as a major tourist attraction in the area concerned.

For your information, one of the proposals identified in the master plan is to establish the Johor Creative Art and Performance Centre, with a concept of studios, galleries and theatres to present demonstrations, training and cultural performances. This will make the place a one-stop centre for tourists and visitors in introducing the culture of the state of Johor to outside communities.

However, this matter is still at the proposal stage and requires careful study, particularly in identifying a proposed site and potential investors or developers. That is all, thank you.

SpeakerEN

Senai, please proceed if you have a supplementary question.

Tuan Tee Boon TsongDAP · PHSenaiEN

Yes, a supplementary question. I want to ask about the status of financial allocations from the former Minister in the Prime Minister's Office, Wee Ka Siong, also Member of Parliament for Air Hitam, who denied the infrastructure of the Kulai town, such as stating the tourist information centre, the cost of expenditure for mural painting and so on. According to media information printed in Sing Chew Guan Mei and Nanyang Siang Pau on 10 March 2018, the financial allocation was RM500,000.00 for such a plan, and Senai also wants to ask about the status of the action plan, PT11, the proposal to upgrade mural tourism activities at Kelapa Sawit, printed in the Kulai Utama Special Area Plan 2015 to 2025, Kulai district. Based on the recorded estimated cost...

Speaker

Panjangnya soalannya...

Tuan Tee Boon TsongDAP · PHSenaiEN

...in 4.4 Management, yes, implementation...

SpeakerEN

Which question is this...

Tuan Tee Boon TsongDAP · PHSenaiEN

There are two questions. One is the finance from the former..

SpeakerEN

We only allow one question...

Tuan Tee Boon TsongDAP · PHSenaiEN

...the other one is the same allocation, money, money also, with the same allocation. It is proposed under PT11 that there is RM7 million to upgrade that area. This Kelapa Sawit area, who organised its Art Festival? I did, I painted the mural there. I have never received 10 sen from the government either. Why did it state that there is a budget of RM7 million for that project? That is my question.

Speaker

Ok.

Tuan Tee Boon TsongDAP · PHSenai

Terima kasih.

SpeakerEN

Honourable EXCO, please.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you to the ADUN for Senai. I thank the ADUN for Senai, because previously, although not a people's representative, he carried out many activities in the Kelapa Sawit area....

SpeakerEN

No wonder he won.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

...painting a beautiful mural at that place. Although he did not receive an allocation from the previous government, he still continued to paint the mural at that place. To answer the question of the ADUN for Senai, we are aware that before the election, many promises were made by the previous government. But so far, after checking, the Kulai Administrative Council, MPKu, found that there is no financial allocation as mentioned, which has been channelled, as stated by the ADUN for Senai. That is all, thank you.

SpeakerEN

So, Honourable Member, just give charity. Just give that charity. Ok, Bukit Permai.

Tuan Tosrin bin JarvanthiBERSATU · PHBukit PermaiEN

Mr Speaker, I put a question to the government. We have an airport of international standard, Senai International Airport, but I am very saddened and regretful that Senai International Airport does not have a viewing area. That means families who bring their children to see the aeroplanes cannot. So, what is the government's plan under the tourism sector, I ask that a viewing area be provided at Senai airport, Honourable Member. Thank you.

SpeakerEN

I am not sure whether this question is exactly the question asked. But I will invite the Honourable EXCO.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you to the ADUN for Bukit Permai. This proposal is a good one. I will submit this question and proposal to Senai Airport. That is all, thank you.

SpeakerEN

Hmm... once it is finished, Bukit Permai will be the first person to go up there. (House laughs.) I now invite the next speaker, Semarang.

Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, my question is question number 6.

Please state the government's plans and the status of those plans to make the district of Segamat a hub for agriculture and the production of primary agricultural produce, and what types of agricultural activities are prioritised.

SpeakerEN

I invite the Honourable EXCO.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Bismillahirrahmaanirrahim. Honourable Mr Speaker, thank you to Honourable Semarang. Segamat is a district with great potential to be developed as a hub for agriculture and the production of primary agricultural products. The district has an area of 285,136 hectares and a population of 213,000 people. Segamat is the largest district in terms of the harvesting area for the main crops, including durian, pomelo and papaya, jackfruit, banana and rambutan, covering 6,522 hectares. For each, in the agriculture sector, the main activities have been dominated by crop cultivation, eco and agro-tourism, and small and medium industries. The main products of Segamat district are durian, papaya, pomelo, coconut, livestock farming and also fisheries. Segamat targets and focuses on 3 main areas, namely modern agriculture, akronik attractions and eco and agro-tourism. In terms of strengths, Segamat district has abundant agricultural resources, fertile soil, a strong agriculture-based community, and a farming community that is ready to grow and advance this sector. Segamat also has unique products such as Segamat durian and baung fish. A study relating to the development plan for an agricultural hub and primary agro-based industry has been carried out to drive the agriculture sector and primary agro-based industry in this district, in a more comprehensive manner over the short and long term. At the district administration level, the Segamat District Office has started this initiative, such as by setting up facilities to support and boost the activities of the agriculture sector and primary agro-based industry.

Besides that, the state government's efforts to establish the Northern Johor Corridor Development Region, involving three districts in Northern Johor, namely Segamat, Tangkak and Muar. This is in line with the aspiration to make Segamat an agricultural hub and primary agro-based industry. This is because this region focuses on the education, furniture, modern agriculture, primary agro-based industry, and eco and agro-tourism sectors. Thank you.

SpeakerEN

Semarang, please proceed with your supplementary question.

Thank you, Honourable EXCO. To make Segamat an agricultural hub and the production of primary agricultural products,

I would like to ask whether the government will focus only on existing agricultural operators, or will it provide new areas for new participants and industry players who have been identified as experienced, and what are the government's efforts to ensure that the value chain in this agricultural industry remains functional in this new hub? Thank you.

Speaker

Jemput.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Honourable Mr Speaker, the Department of Agriculture focuses on both areas. That means we will advance livestock breeders and small farmers, and we will also provide land for them to cultivate. For example, the latest project is the agromix farm that we have implemented along the road between Mersing and Muadzam, where for the first phase of the agromix farm, we have given land totalling 50 acres to 11 operators, where the operators can set up something like a show room to represent the projects or livestock farming or agricultural activities that they have undertaken.

Likewise, the agromix farm has several phases, where the total area of the agromix farm is 156 acres. So, with the initiatives and intensive efforts carried out by the Department, I am fully confident that Segamat will become an agricultural hub for Johor. Then, there are also many projects that we have implemented, for example, strengthening the downstream industry. And to ensure the supply stock of fruits is not marketed or to ensure fruit prices do not fall, the government will also ensure, the government is working to export the fruits available in the Segamat area. That concludes my reply, thank you.

SpeakerEN

Bukit Kepong, are you present? Not present, is that right?

Honourable Speaker, supplementary question, thank you, Honourable Speaker. I really agree with what was informed by Honourable EXCO regarding the agricultural hub that will be implemented in the Segamat district. What we see is, in fact, what the previous government planned, namely that the Segamat district was indeed designated as a district that would be given priority for us to establish an agricultural hub. However, what I was really interested in was what was informed by the Minister of Agriculture, who proposed that fishermen plant pineapples and so on behind their houses. So, does Honourable EXCO or the Department of Agriculture have a specific plan or special programme to see that this is also one of the programmes, because we are only focusing on the agricultural hub in the Segamat district? Thank you.

SpeakerEN

Please, Honourable EXCO.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Thank you. I have not yet been given a presentation or explanation about what the Minister said, but in my view it is an idea to ensure that fishermen do not only focus on being fishermen. For example, perhaps fishermen could also work by doing some planting. That is actually what the previous government did, for example, like us in the village areas, we were encouraged to plant oil palm. We were also encouraged to plant rubber and perhaps we were also encouraged to create fruit orchards, because at one time, rubber may fall in price, but oil palm will rise, and fruit usually always rises. That is perhaps the idea of the Honourable Minister, where fishermen, besides focusing on ensuring that their livelihood as usual as fishermen, may also think about how to add income to ensure that earnings always increase. So, in coastal areas, the best is usually to plant coconuts or perhaps in that area, pineapple cultivation is suitable. So, fishermen are encouraged to

catch fish and also perhaps have other products such as growing pineapples and coconuts. That concludes my reply, thank you.

SpeakerEN

Sedili, please, Sedili.

Thank you, Mr Speaker. My supplementary question, for information, is that in Sedili, most are fishermen. They live as lodgers in the houses of old people. With the government's policy today, which tells fishermen to plant crops and so on, will the government give land to fishermen who have no land? Thank you.

Speaker

Jemput.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Thank you for the question. Insya-Allah, that is a good idea or view, but up until today, I have not been informed whether there is any provision of land or not? Nevertheless, I will bring that matter to the attention of the Honourable Minister, thank you.

SpeakerEN

Next question, please proceed, Pekan Nanas.

Tuan Yeo Tung SiongDAP · PHPekan NanasEN

Honourable Mr Speaker, my question number 7.

Will the government review the implementation of the VEP at the Johor Causeway and the Second Link Expressway? What problems are faced in the implementation of the VEP, and I request clarification and the government's stance on the implementation of this policy?

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Assalamualaikum warahmatullahi wabarakatuh, good morning, greetings of peace. Honourable Mr Speaker, for the information of Honourable Pekan Nanas, at this time the implementation of the VEP, Vehicle Entry Permit, is at the Professional Acceptance Test (PAT) stage and will commence the Final Acceptance Test (FAT) phase before it is officially implemented. Given that the VEP has not yet been officially implemented, at this time, there are no operational problems of the VEP that have been identified, and it is too early for the government to review the implementation of the system.

In this regard, the government still maintains the implementation of the VEP because this system will be able to help strengthen national security in terms of reducing the problem of illegal vehicle entry, eradicating the smuggling of cloned vehicles, and ensuring that all foreign vehicles comply with all the road traffic rules of this state. Thank you, Honourable Speaker.

SpeakerEN

Please proceed, Pekan Nenas, supplementary question.

Tuan Yeo Tung SiongDAP · PHPekan NanasEN

Honourable Mr Speaker, the actual implementation of the VEP was planned to begin from 1 August 2015. The company that obtained the VEP implementation project is TC Seng Sdn. Bhd. through direct negotiation. According to information from the investment bourse, TC Seng Sdn. Bhd. has subcontracted this project to a third party, Dagang Nes Cheng Sdn. Bhd., valued at RM104 million.

This TC Seng company also involves former Member of Parliament for Tanjung Piai, Wee JeckSeng, who holds 25% of TC Seng. My question is, is it proper for politicians to get involved in government projects because it is contrary to principle, namely conflict of interest? And will the government review the handing over of this project to TC Seng Sdn. Bhd. because it has subcontracted

part or all of the contract to a third party. Thank you.

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Honourable Mr Speaker, thank you to Honourable Pekan Nanas. So, this is information that I have only just received, and I frankly say, before this I personally did not know whether or not a former Deputy Minister was involved, but in terms of the moral of the story, it is really not proper, whether wrong or not wrong, we must refer to it and confirm it properly, because with this matter we must first confirm any information we receive, whether it is correct or not, before we take legal action or the like. So, for this, we will carry out the next follow-up, and coincidentally I have a meeting with the Minister of Transport in two weeks' time, because the VEP is under the Ministry of Transport, and we will discuss the matter.

In fact, the system is good, only the question is who owns or holds the project, and that is what the public is questioning. The system has no problem, it is a good thing so that, as I said earlier, we can control it, we do not want cars returning from Singapore, coming into Malaysia, not going back, and staying in Malaysia, becoming cloned cars. Sometimes, there are small syndicates that make these cars, when there is an accident, they get a new car, its body like this, and under the JPJ (Road Transport Department). So, for this information, we will forward it to the Ministry of Transport. So, I also cannot make rash accusations and so on. As a fair government, I also need to obtain confirmation, so we consider this as a suspected matter, so the suspicion must be investigated first. Thank you for providing the information.

Speaker

Panti.

Tuan Hahasrin bin HashimUMNO · BNPantiEN

Bismillahirrahmaanirrahim. Thank you to Honourable Speaker and thank you to the Pakatan Harapan government for continuing or agreeing to the implementation of the VEP. I still remember a few years ago, I was among those who debated the VEP together with Honourable Speaker here in Pulai, if I am not mistaken. Anyway..

SpeakerEN

PAS was still there at that time, was it?

Tuan Hahasrin bin HashimUMNO · BNPantiEN

PAS was still there at that time. Anyway, I would like to obtain certainty from the state government about when the VEP is implemented, whether there will be collections made by the federal government. Among the proposals put forward earlier was for the state government to apply for a small portion of these collections to be channelled directly to the state government. This is intended to ensure that the state government, besides receiving returns, can also use them for the maintenance or development of new and existing infrastructure in our state.

Anyway, that is what I want to obtain certainty on, whether the state government has formally made an application or requested that a portion of these collections be channelled or returned to the state government? Thank you.

SpeakerEN

Please, Honourable EXCO.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Thank you, Honourable Panti, Honourable Speaker. The VEP is under Section 66(h), where the JPJ must record all vehicles that enter. So, what is paid is not the VEP, what is paid is actually a road charge. The VEP process does not even involve payment. This road charge, based on statistics from 2017, the estimate is that we obtain about 100 million, and 25%

is for the state government and 75% is for the federal government, and our source is about 25 million, a rough estimate of 25 million. So, this returns to the state government and the state government can use it for development and also maintenance and so on. So, that is what I can answer to this question. Thank you.

SpeakerEN

Next question, please, Senai.

Encik Tee Boon TsongDAP · PHSenaiEN

Thank you, Mr Speaker, my question no. 8.

The Senai area frequently experiences water supply disruptions. When pollution occurs at the water treatment plant, not less than 3 hours, the Seelong area faces a critical water supply disruption. I understand that the Senai area has several water tanks, can you list the total number of all water tanks in the Senai area and how many water tanks are functioning?

SpeakerEN

Please, JB EXCO.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Thank you, Mr Speaker. Firstly, I would like to express my thanks also to the Honourable Member from Senai, not only for this question but for all this time being so firmly involved in the oil palm programme. For the information of this august House, he is a very talented artist, and for 4 years now in the oil palm programme he has drawn many formulas. I invite all Honourable Members here to come and visit on 30 to 31 August, the Less Art At Sawit Festival, perhaps the Honourable Member for Senai could also give a tour, and I hope he has become an Honourable Member, do not forget that if you have time, you can come back and paint again with even more beautiful murals. The House applauds.

SpeakerEN

This is a promotion, Honourable Member. (The House laughs.)

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Also tourism promotion. Honourable Mr Speaker, the Senai area currently receives water supply from the Semanggar Water Treatment Plant through the Bukit Balancing Tank 75, which is then channelled to the service tanks located in the Senai area, namely 20 tanks. All of these tanks are functioning well.

The Seelong area, which has 1792 accounts of Syarikat Air Johor, and the Kampung Maju Jaya area, which has 138 SAJ accounts, are hilly areas and receive supply directly from the Bukit Balancing Tank 75, because the other existing service tanks are not suitable for channelling water to those areas. Regarding the water supply disruptions that occurred beyond the control of SAJ Ranhill, which were caused by pollution, it is informed that throughout 2017 and 2018 there were 3 incidents of raw water pollution in the Johor River, namely ammonia pollution that occurred on 22 August 2017 and 27 October 2017. There was an incident of high raw water turbidity reaching as high as 1,564 NTU on 6 April 2018, as well as an oil spill incident that occurred on 10 May 2018, recently. In addition, the plant also faced incidents of TNB power supply interruptions on 4 September 2017 and 29 April 2018.

Honourable Mr Speaker, the Honourable Member for Senai also made an enquiry to list all the water tanks in the Senai area and how many water tanks are functioning? For the long term, SAJ also has plans to build an elevated service tank with a capacity of 4.5 million per day around Kampung Maju Jaya to overcome the problems that have occurred until now, which is at the design stage by Pengurusan Aset Air Berhad (PAAB). For information, this tank is expected to be completed in early 2020 and will benefit approximately 1,930 account holders of Syarikat Air Johor. While waiting for this project to be fully completed, and if an incident occurs where the Semanggar Water Treatment Plant has to stop operations, then to minimise or reduce the impact of water supply disruption, Syarikat Air Johor

has been directed by the government to instruct water supply lorries to the affected areas in the shortest possible time, where priority for this tank supply is given to dialysis centres, places of worship, hospitals, school hostels, deaths and celebrations.

For the information of this august House, there are 20 water tanks in the Senai area, allow me to read them out.

1. Senai balancing tank with a capacity of 6.82 million litres. 2. Taman Desa Idaman 2 with a capacity of 2.59 million litres. 3. Taman Scientex Senai tank with a capacity of 6.82 million litres. 4. Senai Airport City 1 with a capacity of 5.77 million litres. 5. Taman Senai Jaya with a capacity of 0.64 million litres. 6. Senai 2 A with a capacity of 1.14 million litres. 7. Taman Bintang Utama with a capacity of 1.82 million litres. 8. Taman Bintang tank with a capacity of 0.68 million litres. 9. Industrial tank in Senai 2 with a capacity of 2.27 million litres. 10. Industrial tank in Senai 4 with a capacity of 1.86 million litres. 11. Senai 3B Industrial tank with a capacity of 3.18 million litres. 12. Senai Airport 2 tank with a capacity of 3.3 million litres. 13. Taman Senai Utama 1 tank with a capacity of 1.14 million litres. 14. Taman Senai Utama second with a capacity of 1.82 million litres. 15. Taman Aman with a capacity of 1.59 million litres. 16. Taman Bukit Senang tank with a capacity of 0.91 million litres. 17. Senai 5 tank with a capacity of 0.45 million litres. 18. Senai First tank with a capacity of 0.91 million litres. 19. Senai 4 tank with a capacity of 2.27 million litres; and 20. Finally, the Taman Impian Senai tank with a capacity of 1.59 million litres. That concludes my reply, thank you.

SpeakerEN

Supplementary question from Senai.

Encik Tee Boon TsongDAP · PHSenaiEN

Thank you, Mr Speaker, thank you EXCO. The opening of the Art Festival at Kelapa Sawit, everyone is welcome to come on 30 and 31 August. My supplementary question: it is understood that every water storage tank capacity must be able to supply water without being affected for 24 hours to its areas even when the water supply from the water treatment plant is cut off. What plans does the Johor State Government have to ensure the period of water supply after water rationing can be extended towards 24 hours without disruption? Thank you.

SpeakerEN

Honourable EXCO, please.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Thank you, Honourable Senai, for the supplementary question. Mr Speaker, the Water Services Industry Act 2006 under the Water Services Industry (Water Distillation and Pipe Installation) Regulations 2014 does state matters relating to storage tank capacity, where storage tanks for buildings other than hospitals, airports or industrial buildings must be designed and built with storage capacity of not less than one day's water demand based on usage patterns. Therefore, individual tanks in every premises need to have 24-hour storage to ensure consumers have sufficient water storage should a water supply disruption occur.

For information, the function of central tanks or service tanks is to store water for 24 hours should there be a water supply disruption in any area. There are service tanks that have fallen short of 24-hour storage capacity due to several factors, among them the development of new small settlements nearby using existing tanks. The Johor Water Company has also identified the tanks that need to be built to overcome current and future demand.

Rural areas such as villages generally do not have individual storage tanks at their respective premises, and this is among the causes why they do not have sufficient water storage should a water supply disruption occur. Thank you.

SpeakerEN

Ok. Next, please, Honourable Tenggaroh.

Thank you, Honourable Speaker. Mr Speaker, my question number 9. What plans does the state government have to increase the number of tourists visiting our state?

SpeakerEN

Honourable EXCO, please.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you, Honourable Tenggaroh. Mr Speaker, as we all know, the state of Johor certainly has many tourist attractions with the potential to attract tourist arrivals from within and outside the country. In addition, Johor's strategic location, in the south of the Peninsula, has made the state one of the main entry points for international tourists into Malaysia. Recognising this, the state government, together with cooperation from various government agencies, the private sector and non-governmental bodies, particularly those related to tourism, is constantly intensifying efforts to attract more tourists to the state of Johor. Among the efforts implemented by the state government in attracting and further increasing the number of tourist arrivals to the state of Johor are as follows:

First, intensifying promotion and marketing programmes by participating in tourism exhibitions or sales missions within and outside the country. Increasing the organisation of visit programmes, introduction of Johor tourism products or familiarisation trips for tourism industry players, mass media and travel writers from within and outside the country. So far, 17 programmes have been implemented, which also involved participants from within and outside the country, namely Indonesia, India, Singapore and Korea. Strengthening online marketing by creating a Johor tourism quota and also social media such as Facebook, Instagram and also Twitter. For information, the state government is also in the process of creating the Johor Tourism Mobile Apps, a Johor tourism smartphone application. Encouraging the organisation of international and national-level tourism events in the state of Johor, where this year the state government has planned to organise 3 new tourism events, namely the Lady Bikers Tourism Ride 2018, Food and Art Festival 2018 and also Bangsa Johor Run 2018.

Mr Speaker, in addition, expanding the dissemination of Johor state tourism information through the publication of tourism brochures and advertising campaigns in major magazines and newspapers within and outside the country.

Sixth, diversifying Johor state tourism products by encouraging the emergence of new high-impact tourism products, while at the same time existing tourism products will continue to be monitored and improved from time to time, particularly in terms of infrastructure and supporting facilities.

Seventh, increasing the development of Johor state tourism packages, where this year the state government, through Tourism Johor, has collaborated with NGOs and tourism associations to prepare tourism packages that are ready to be marketed.

Eighth, attracting more domestic and international airlines to operate at Senai International Airport. For information, at present there are 11 domestic flight routes and 6 international flight routes at Senai International Airport, namely from Surabaya (Indonesia), Jakarta (Indonesia), Ho Chi Minh (Vietnam), Bangkok (Thailand), Guangzhou (China) and Incheon (South Korea).

Ninth, enhancing human capital development in the industry by organising courses or training, not only for tourism industry players but also for the people of the State of Johor in general. This aims to help raise awareness or quality of service and to create a tourist-friendly culture among the people of the State of Johor.

Thank you.

SpeakerEN

Please... there is no supplementary question. Perling.

Tuan Cheo Yee HowDAP · PHPerlingEN

We know that nowadays is the modern era and perhaps we use the internet to get information. So, can I... I want to ask about whether there is any difference compared with before in terms of promotion, in terms of the internet, whether there are measures taken to improve or in terms of promotion from there.

SpeakerEN

Honourable EXCO, please.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Mr Speaker, it cannot be denied that in this era the internet is very important for all parties, and especially in promoting the tourism sector.

For the information of this honourable House, previously the internet or website of Tourism Johor had not been updated for a long time. When I took up this portfolio, I found that previously the former Government had planned to update the website at a cost of RM1.9 million. However, after I reviewed it, I found that the company did not meet the requirements and did not deliver what had been implemented and what had been planned. And we have cut the payment rate to RM600,000.00. And thereafter I will continue to monitor so that this website will be updated to promote tourism in the State of Johor.

Speaker

Ya Permas.

Thank you, Mr Speaker. As we know, every year the Government holds the Kite Festival held at Pasir Gudang. My question is, does the Government have any additional plans besides the Kite Festival held every year? My suggestion is that we hold an International Bike Week for Pasir Gudang every year. Thank you, Mr Speaker.

SpeakerEN

Honourable EXCO, please.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you, ADUN Permas. The Kite Festival is indeed a good festival of international standard, and I too have participated in and visited this festival every year. To answer the question of ADUN Permas, as I mentioned just now, there are festivals to be held such as the Johor Food and Art Festival, which is at state level, and I also invite or receive all proposals from every ADUN if there are good proposals to hold any festivals in their respective places.

Speaker

Mengkibol.

Tuan Chew Chong SinDAP · PHMengkibolEN

Thank you, Mr Speaker. I have submitted a working paper on the Lembaran Johor Tengah which integrates agro-tourism and food processing to the Honourable Menteri Besar, to the EXCO for Agriculture, and to the EXCO for Tourism. And I would like to ask, are there any measures to launch this programme? I believe this programme will have a major impact on the economy and will also attract many tourists. Thank you.

SpeakerEN

Honourable EXCO, please.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you to ADUN Mengkibol. According to the proposal submitted by ADUN Mengkibol, the proposal involves several portfolios, for which I need to hold a meeting together with the agriculture portfolio and also the transport portfolio to realise his proposal.

SpeakerEN

Next question, please, Machap.

Mr Speaker, question number 10.

State the effectiveness of co-curricular activities in schools in helping to foster racial unity in schools.

Speaker

Jemput EXCO.

Tuan Mohd Khuzzan bin Abu BakarPKR · PHChairman of the Committee on Youth, Sports and Culture · SemerahEN

Assalamualaikum, greetings of peace, greetings of hope. Mr Speaker, Honourable Machap, I would like to thank Honourable Machap. I see from these questions that Honourable Machap is truly concerned about issues at school level. Students before entering university, I see that for all the questions I have received, I thank Honourable Machap.

In answer to the question of YB Machap, co-curricular activities are the most potent medium for fostering unity, because in co-curricular education the tagline "unity through co-curriculum" is enhanced.

In the implementation of co-curricular activities, a condition of participation is also included, namely the involvement of various races, whether in uniformed group activities, clubs and associations, and arts and cultural activities.

Through observation and experience, the effectiveness of co-curricular activities has been proven, through being able to nurture racial unity through the togetherness of pupils of various races carrying out co-curricular and sports activities together. It has clearly succeeded in teaching them to understand one another, to be able to work together in a group and to help one another in completing a task, as well as the problems given. Pupils from different backgrounds and races are also seen to show a high level of keenness as a result of frequently carrying out co-curricular activities together. They are also seen to display positive values such as mutual respect and helping one another. They are also able to accept differences based on religious beliefs and descent. Thank you.

Speaker

Soalan tambahan.

Mr Speaker. Machap thanks the answer given by the representative of the EXCO for Education, whom Machap considers to be truly skilled in answering questions related to education.

The supplementary question from Machap, as was explained just now, is that each pupil is asked to join 3 units, namely one uniformed body, then a sports games club and another related to associations or arts. So among these three, which is considered to lead more towards unity among pupils of this multiracial group? That is, just now there were 3 units, namely sports games club, uniformed body and also association. Among these three, which gives more impact in fostering unity among pupils? Thank you.

SpeakerEN

Honourable EXCO, please.

Tuan Mohd Khuzzan bin Abu BakarPKR · PHChairman of the Committee on Youth, Sports and Culture · SemerahEN

Thank you, Honourable Machap. If we look at it now, regarding a... I think games. The problem with games now is that the school chooses for each pupil, whether or not they are interested in the games, the school will place them there. But I hope in the future, schools should also look at this games area, ensuring that if a child is truly interested, the pupils are interested in each of those games, give them the opportunity to play those games. For example, if he is interested in playing football, give him the opportunity to play football.

As for uniforms, I think the best, in fact, Honourable Machap, for us in terms of the activities carried out. But so far, if we look at my experience as a father, most of these uniformed bodies also move along racial lines, sometimes. Because in the field of the Red Crescent, the majority, and also St John Ambulance, the majority are Chinese. For police cadets and army, the majority are Malay. So I hope, and I will request the Honourable EXCO for Education later when I return, I will discuss with him, to ensure that we need to have all races in all activities held. Insya-Allah I will discuss it and if possible we can sit together, Honourable Machap, because I have been informed that Honourable Machap is indeed one of those well-versed in education issues. Thank you.

SpeakerEN

Ok, I will conclude oral questions and supplementary questions for now because it is already 11.00. Everyone likes me to remind that of the questions raised, those that are of a local nature are better brought to the District Action Council Meeting, not brought into the House, unless the District Action Council does not implement what we hope for. So it is fine to bring them into the House, but if they can be implemented at the District Action Council level, it would be better for those questions to be raised there. So in this House we can focus on issues related to policy and so on.

If there are questions listed that have not yet been answered orally, they will be answered in writing in the same Sitting.

Written Questions.Questions

ClerkEN

Answers to written questions by the Honourable Members have been tabled on the Meeting Table.

Continuation of debate on expressing gratitude for the Royal Address of His Majesty the Sultan of JohorAddress / budget

SpeakerEN

Honourable Members, this debate is now resumed. Please, the Honourable Chairman of the Select Committee on Housing and Rural Development, please.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Thank you, Honourable Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh, good morning, a good hope, greetings of love to my Malaysia. Honourable Mr Speaker, before I continue with the winding-up session, I would first like to record my thanks in particular to the Most Honourable Menteri Besar of Johor, Dato' Haji Osman Osman, my fellow Honourable Members of the State Executive Council, my fellow Honourable State Assemblymen (ADUN), and all departments and agencies of the Government, for the success of the Launch Ceremony for the Work Action of the Johor Sustainable Development Plan 2019-2030, held yesterday at Persada Johor under the theme "Johor Berprestasi Tinggi, Bangsa Johor Bestari".

The launch ceremony yesterday produced two outcomes:

1. The success of the Pakatan Harapan Government in implementing the 10 election promises of Pakatan Harapan within the 100-day period as promised.

2. The launch of the Work Action of the Johor Sustainable Development Plan 2019-2030 with 8 main pillars that form the foundation, or pillars, with permission, of the direction of Johor's development to achieve the status of a High-Performance State by 2030.

I hope the launch ceremony yesterday can answer the questions raised by several Honourable Members of the Opposition on what form the development direction of the State of Johor under the administration of Pakatan Harapan Johor takes. What is important now is for all of us to work together as one team to realise the Johor Development Plan 2019-2030 in reality. An English proverb, with the permission of Honourable Mr Speaker, says, "if you want to go fast go alone, if you want to far go together".

Honourable Mr Speaker, the Pakatan Harapan Government has made several changes towards improvement, particularly in terms of transparency in the affordable housing system, to ensure that every affordable house built reaches the target groups, especially B40 and also M40. The first step taken by the Pakatan Harapan Johor Government was to abolish the Government Vertical Quota, or in short KMK, which was given to the Barisan Nasional component party, especially the UMNO party. This quota was abolished in line with the decision of the Johor State Executive Council dated 12 June 2018. This quota was abolished to ensure the distribution of affordable housing reaches the target groups. This quota was also seen as non-transparent and highly exposed to corrupt practices and abuse of power, such as the arrest of one UMNO Youth Chief together with his female companion involving the offer of affordable housing amounting to RM120,000.00.

The second step implemented was to offer a 50% discount to tenants of the Public Housing Programme, or in short PPR, if they pay all their rental arrears. This step is in line with the 10 offers within the 100 days of the Pakatan Harapan Johor Government. Honourable Mr Speaker, the third step taken by the Johor Government was to introduce the Johor Two Affordable Housing System, in short SP2MJ, on 27 July 2018, effective 1 August 2018. SP2MJ is a system for the open distribution of Johor People's Housing. This system is no longer based on applications by location but is according to projects opened within a certain period. The pilot projects for the SP2MJ system, as can be viewed on the portal e-rumah.johor, are at Taman Daiman, Kota Tinggi, and also Taman Bandar Putera, in Segamat. The objective of this new system is to create a more transparent affordable housing distribution system and provide a fairer opportunity for affordable housing buyers in the State of Johor.

Honourable Mr Speaker, the fourth step taken by the state government was to establish a taskforce to review the Johor People's Housing Policy. For the information of this August House, there has been no further review or study on the Johor People's Housing Policy since 2014. The purpose of this review taskforce is to ensure that the Johor Housing Policy always remains relevant, respected, and able to face current issues in the housing industry. Some loop holes, with permission, that exist in the policy will be improved so that developers in particular do not use these weaknesses to avoid building the affordable housing that is badly needed by the people of Johor, because until now there are 115,515 names on the waiting list, with permission, to obtain affordable housing in the State of Johor.

Honourable Mr Speaker, I would like to answer several questions relating to rural development. Sungai Balang and Pasir Raja have touched on the procedure for appointing the post of village head, as well as the eligibility and criteria required to hold the post of village head. Before that, I would like to correct the statement of the Honourable Member for Pasir Raja, who said that the state government had terminated the services of 1,700 village heads. In fact, the state government only terminated the services of 674 village heads. I am not sure where the Honourable Member for Pasir Raja obtained that figure, and next time there should also be more accurate statistics; you may contact me, insya-Allah. Apart from the main villages that have village heads in Johor, we have approximately 2,075 network villages.

Honourable Mr Speaker, according to the Johor Government General Circular Number 3 of 2018, the criteria for appointment and the method of appointment are clearly stated as follows:

1. A village head must be from among those who are Muslim and of Malay descent, except for villages that were originally headed by a non-Malay village head.

2. Possess the Sijil Pelajaran Malaysia, SPM, or SPMV from a secondary school, technical school, vocational school, or other qualifications of equivalent standing.

3. Other similar qualifications: although not having the qualifications as stated above, but able to read and write and possessing qualities of piety, then the applicant may be considered.

4. Not from among serving government employees.

5. Age not less than 25 years.

6. Domiciled in the village concerned.

7. No criminal record.

8. Active and vigorous in organisational movements, associations, charitable work, and showing leadership capability in the field of community affairs.

9. Having the trust and respect of the majority of village residents.

10. Having physical and mental health.

11. Possessing the qualities of takwa. So to be a village head, Honourable Mr Speaker, one must be pious.

Method of appointment. When there is a vacancy for the post of village head, the District Officer is required to announce it to the public through an advertisement in the newspaper. For the information of this August House, former village heads are also allowed to apply.

Second, once applications are received, an interview session will be held by the Special Committee for the Selection of Village Heads, chaired by the District Officer, with members consisting of village heads, the Chief Assistant District Officer, Assistant District Officers, district kadis, penghulus, and government officers deemed suitable by the District Officer. This committee does not involve the leadership of political parties, so that the selection of village heads is made in a more transparent manner.

Third, the District Officer will make a statement to the Honourable State Secretary based on the decision of the Special Committee for the Selection of Village Heads meeting.

Fourth, the Honourable State Secretary of Johor will forward the above statement to the Most Honourable Menteri Besar of Johor for the final decision. And insya-Allah, the appointment of village heads in the State of Johor will be settled in September next, because the directive from the Ministry of Rural Development, 1 October, is the settlement date for the appointment of village heads throughout the country.

Honourable Mr Speaker, I would like to answer further several questions that were directed to the Chairman of the Religious Affairs Committee. The Honourable Member for Rengit, Sungai Balang, Penawar, and Parit Raja raised the matter of the stand of the Pakatan Harapan Johor Government on the LGBT issue, with permission, Lesbian, Gay, Bisexual and Transgender. I would like to state that the stand of the Pakatan Harapan Johor Government is based on the teachings of Islam itself, which is the federal religion in our country. As a Muslim, I would like to emphasise that we do not at all agree with the actions carried out by the LGBT community, which include men dressing as women or vice versa, sex change, behaviour resembling women, and the like, as well as same-sex sexual inclination. To ease the situation following the LGBT issue, which has been politicised more than seeking a holistic solution to bring them back to their origins so that they can live a normal life in line with human nature itself.

I would like to state in this August House the stand of the state government on the LGBT issue. First, the LGBT lifestyle is a sin and is prohibited by Islam because it clearly contradicts human nature itself. The hadith narrated by Al-Bukhari and Abu Daud states that indeed the Prophet SAW cursed men who imitate women and women who imitate men. If LGBT practices are carried out openly, then it is a sin prohibited by Islam and also an offence that can be taken legal action under the provisions of the existing enactments or acts at this time, such as the Syariah Criminal Offences (Johor) Enactment 1997. For example, Section 25 states the punishment for men who commit liwat or gay, while Section 26 states the punishment for women who commit musahaqah, same-sex sexual relations, or lesbianism. Section 28 states the punishment for any man who wears women's clothing and acts like a woman in any public place. And Section 29 states the punishment for any person who acts or behaves indecently contrary to syarak punishment in any public place.

Honourable Mr Speaker, if LGBT practices are carried out secretly without witnesses, then it is a sin between the perpetrator and Allah SWT. Although that act, however, remains a sin and is prohibited by our Islamic teachings.

Fourth, although an individual practises the LGBT lifestyle, which is a sin and prohibited by Islam, their involvement in that deviant LGBT lifestyle will not remove their rights in other matters, especially life in the nation. As citizens of an independent country, where every citizen has rights such as the right to education, the right to employment, the right to medical treatment, the right to security protection, the right to buy and sell, and even the right to own property without any discrimination.

Based on the conclusions and findings of the JAKIM study over 8 years, which is also a scholarly study, among others by Dr. Izwan Yusof, Teh Yik Koon and Associate Professor Dr. Rafidah Hanim, they concluded that the difficulty transgender persons, or those experiencing gender dysphoria, face in obtaining employment due to rules set by employers, as well as customs and culture, are among the factors that encourage them to become sex workers because they consider themselves not accepted by society. The need to approach transgender persons, engagement, with permission, and to understand the ins and outs of the method so that they can be drawn to acquire Islamic knowledge and religious knowledge until they eventually leave the conduct cursed by Allah SWT is a duty of da'wah. Efforts for them to return to a normal life are an act of worship and earn great reward. We cannot simply curse and shun them without the authorities in particular approaching them and giving them an opportunity in a gentle and targeted manner. In the context of individual da'wah, the approach of "al-nasihah bil hikmah", with permission, must be carried out without first resorting to threats and curses before explaining, clarifying, and approaching. This is the methodology of da'wah taught in the Quran when Prophet Musa AS was commanded to face Pharaoh with gentle words, as mentioned in surah Taha verses 43 and 44, and also the meaning of surah An Nahl verse 125 "serulah manusia kepada jalan Tuhanmu dengan hikmah dan pelajaran yang baik dan bantahlah mereka dengan cara yang baik". I would like to emphasise in this August House that engagement, with permission, holding discussions with the LGBT community is different from recognising the LGBT struggle. The situation has become chaotic when certain parties take advantage of troubled waters to gain political mileage from the engagement carried out by the Pakatan Harapan Government with the LGBT community.

Based on several studies by JAKIM, the Muslim LGBT community in Malaysia is divided into 3 categories. And the category that needs emphasis and guidance is those who wish to change and migrate and acknowledge that their conduct is contrary to religion. For this category, continuous dialogue must be carried out to mutually understand one another so that they do not continue to go astray. Only after that should other approaches be planned and initiated. The Johor State Islamic Religious Department, as an institution that manages Islamic affairs in the State of Johor, takes the issues related to LGBT very seriously. The Johor State Islamic Religious Department is very committed to carrying out, in carrying out the duties of amar makruf and nahi mungkar, towards all Muslims in the State of Johor, including the LGBT community. Therefore, the Johor State Islamic Religious Department always strives to carry out da'wah duties to provide awareness, advice, and guidance to the LGBT community. The Johor State Islamic Religious Department has and is continuously implementing guidance classes and awareness programmes. The Department's efforts to approach this group have been carried out since 2016 by collaborating with non-governmental organisations, NGOs, such as Intan Lifezone, MyHijrah, and also Ratu Maharani.

For the information of this August House, since 2016 until now, Fardu Ain and Al-Quran guidance classes have been held regularly every week at Masjid Tun Hussein Onn, Larkin. At the same time, motivation and awareness programmes, as well as programmes in conjunction with Islamic celebration days, are also implemented to help this group return to their fitrah. In short, Honourable Mr Speaker, I feel that the teachings of Islam provide opportunity and hope for humans to return to their Creator, their Maker, namely Allah SWT, through repentance, as long as the soul has not reached the throat.

Honourable Mr Speaker, three days ago I saw an infographic of the Honourable Member for Parit Raja that went viral in the new media, and I feel and am certain that this infographic has bad intentions. This infographic is titled "Program Iqra dan Fardu Ain ditamatkan, LGB diperjuangkan". And the content of the infographic is, " apa rasionalnya kerajaan hari ini iaitu Pakatan Harapan sebagai kerajaan negara Islam apabila menamatkan program yang baik seperti Program Iqra dan Fardu Ain kemudian mengiktiraf perjuangan LGBT yang bertentangan dengan ajaran Islam".

I want to ask Parit Raja, since when has the Pakatan Harapan Johor Government recognised the LGBT struggle? From the statement I mentioned just now, the stand and attitude of the Pakatan Harapan Johor Government on the LGBT issue is very clear, and the statement of Parit Raja is very full of slander. I also want to state to Parit Raja, whether he knows or does not know the facts behind what he claims, that the Pakatan Harapan Johor Government terminated the Iqra and Fardu Ain Programme. If he does not know, I advise him to always practise tabayyun, to examine the information he received earlier before making wrong conclusions. Indeed, in the Quran Allah says (the Word of Allah), " Wahai orang-orang...

SpeakerEN

Honourable Member, what is tabayyun?

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Tabayyun (verification) means checking and examining the information we obtain before we make a decision based on that information. If we do not perform tabayyun on this information, if we do not investigate it, we fear we will make a wrong decision against a party, which in the end will cause us to regret our action.

Honourable Mr Speaker, for the information of Parit Raja, the Iqra and Fardu Ain Programme referred to is the Iqra and Fardu Ain Programme conducted at TABIKA KEMAS, because Fardu Ain and Iqra classes at other institutions in the state of Johor are still continuing. TABIKA KEMAS has been running the Iqra and Fardu Ain Programme since 2014, using allocations from the office of the former Menteri Besar of Johor, involving 240 TABIKA KEMAS in 26 Parliamentary constituencies in the state of Johor, with an allocation of RM1.647 million from the office of the former Menteri Besar.

When the transfer of power took place last May, the programme was temporarily suspended until a request for reallocation was received from the Community Development Department (KEMAS). According to my checks at the office of the Most Honourable Menteri Besar, up to now no application has yet been received from KEMAS to obtain allocation to continue the programme. So, where is the truth of the claim by YB Parit Raja that the Johor Pakatan Harapan government terminated this Iqra and Fardu Ain Programme? So, Parit Raja's accusation that the Johor Pakatan Harapan government terminated this Iqra and Fardu Ain Programme is untrue and is made with malicious intent to give a bad image to the Johor Pakatan Harapan government. I hereby urge the Honourable Member for Parit Raja to withdraw his statement and to apologise publicly to the Johor Pakatan Harapan government. (The House applauds).

The Word of Allah SWT (the Word of Allah): "Slander is more cruel than killing." I would like to remind all of us in this honourable House to stop practising the politics of slander, the politics of race, and the politics of inflaming religious sentiment, because such politics does not greatly help in building a nation-state like Johor, which we love. Let us move to a new era of politics, namely politics based on argument and also facts. (The House applauds).

Honourable Mr Speaker, how many more minutes are there?

SpeakerEN

Please be mindful, Honourable Member.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

With your permission, Honourable Mr Speaker, I would like to continue answering several questions addressed to the Johor State Religious Affairs Committee.

For the information of the Honourable Speaker and the Honourable Members, of the 10 incentives within the first 100 days of Pakatan Harapan Johor, 3 incentives were assigned under the Portfolio of Islamic Affairs and Education, among them:

1. The free Pre-Marriage Course, as announced by the Most Honourable Menteri Besar of Johor during the second day of the sitting of this honourable House, with RM1.44 million allocated by the Johor state government for the benefit of 12,000 couples who wish to marry for the first time only. For a second time, you have to pay with your own money, Honourable Mr Speaker.

2. The Johor State Senior Citizens' Takaful Scheme, which was launched on 5 August 2018 at Pekan Parit Yaani. This scheme, or takaful, involves Johor citizens aged 60 years and above. The state government allocated RM560,000.00 for 11,200 recipients for the first phase.

3. The Harapan Siswa Incentive, as already detailed earlier by the Honourable EXCO for Sports.

Alhamdulillah, all three incentives have been successfully implemented. Thank you to our Pakatan Harapan Johor friends in realising these initiatives. Not forgetting the opposition, who always take an interest in and pay attention to what Pakatan Harapan is doing.

Honourable Mr Speaker, if before the last election BN often played with the issue that the Malays and Islam would be oppressed if Pakatan Harapan governed. Alhamdulillah, after Pakatan Harapan won, the Malays indeed still exist. The Most Honourable Menteri Besar is still a Malay Muslim and Islam still exists. I hope and advise BN to accept the fact that playing the issue of religion and race is no longer effective among the people of Johor, because the people are increasingly wise in assessing matters.

Honourable Speaker and all Honourable Members of the House, Islam under the government of Pakatan Harapan continues to be strengthened. I myself am committed to ensuring that Islam will bring blessings to all. Rahmatullah lil alamin. Surely one of the things to ensure that Islam continues to grow and flourish is through education; Islamic religious education will continue to be strengthened under the Pakatan Harapan government. As a start, RM20,000.00 has been allocated to each government-aided religious secondary school, lower SABK and SMKA. The schools receiving this assistance are as follows:

1. Government-Aided Religious School (SABK) Secondary, 20 schools in total, RM20,000.00 for each school, involving an allocation of RM400,000.00.

2. Government-Aided Religious School (SABK) Primary, involving 8 schools, RM20,000.00 for each school, involving a total allocation of RM160,000.00.

3. National Secondary School (SMKA), involving 5 schools, RM20,000.00 allocation for each school, involving RM100,000.00.

And the total overall allocation is RM600,000.00. The handover of the RM20,000.00 assistance was held on 5 August 2018 at Pekan Parit Yaani and was presented by the Most Honourable Menteri Besar of Johor, Dato' Osman Sapian.

Honourable Mr Speaker, I think I will summarise, and I think I will end my speech with two quatrains of pantun. One I copied from the Internet, one I composed myself.

Sireh leaves in the tray, become the offering at a sovereign ceremony, the people protected, the leader held high, Malaysia independent, forever sovereign.

Go to the market to buy tenggiri (Spanish mackerel), don't forget the celery leaves, a state of high performance, the direction of the state, a Johor people that is intelligent, hope to lean upon.

That is all. Kota Iskandar respectfully requests support.

SpeakerEN

Thank you, YB EXCO. The Most Honourable Datuk, please.

Dato’ Haji Osman bin Haji SapianBERSATU · PHChairman of the Committee on Land Resources, Administration, Finance, Planning and Economic Development, Johor · KempasEN

Bismillahirrahmaanirrahim. Assalamualaikum warahmatullahi taala wabarakatuh. Peace, hope, and good morning. Honourable Member, Mr Speaker, first of all I would like to congratulate and commend all Honourable Members on the quality of the debate, which I have seen to be more transparent and open. I also thank Mr Speaker for giving me the space and opportunity to wind up the debate raised by all Honourable Members.

All Honourable Members have also come forward with very constructive debate and have championed issues involving the interests of the people without setting aside courtesy and the etiquette of debate, as commanded by the Sultan of Johor, Sultan Ibrahim Sultan Iskandar, who does not want to see this honourable House turned into a circus. By God's grace this morning, we have been given the strength to together bring a new hope for the state of Johor. This is so that the results can later be enjoyed by the children of Johor in the future. Before I answer the various issues raised throughout this House's debate today, I would like to express my highest appreciation and thanks for the confidence and firm support clearly and resolutely expressed towards the new state government leadership led by me. With humility, I wish to express my gratitude to His Royal Highness the Sultan of Johor for the support and trust given to me to manage the administration of this state. My administration and I will carry out our duties and responsibilities on the advice and wise views of His Royal Highness.

I would also like to thank everyone for the support and confidence expressed in the arguments presented by the Honourable Members for Senggarang, Stulang, Sedili, Penawar, Tenang, Sri Medan, Kemelah, Buluh Kasap, Pasir Raja, Permas, Tenggaroh, Tanjung Surat, Pemanis, Larkin and also Pulai Sebatang. I am confident that this support and trust was not given blindly, because the Honourable Members themselves could see our capability to implement the promises in the manifesto and that we have a clear direction to develop the state of Johor. Indeed, cooperation in teamwork brings more blessings. Therefore, I receive the support of various parties with humility, with the determination to make Johor the most advanced state and influential in this region. I humbly invite all parties to together give the best for the people of Johor. This session of Parliament is especially unique compared to before, because I used to sit here and sit there, and this is the first time since I became Menteri Besar that I am winding up all the debates from the Honourable Members. This uniqueness refers not only to the leadership of the new state government but also to the attention given by all Honourable Members to the promises made before Pakatan Harapan took over the government.

Mr Speaker, the issues raised in this House also do not stray from touching on the offers made by the state government. Among them, YB Sedili, the Honourable Member for Machap, the Honourable Member for Layang-Layang and also the Honourable Member for Semarang each raised the matter of the 10 promises of the first 100 days offered to the people of Johor previously.

I am rather disappointed by the questions raised, because the issues raised seem to show that they are not sensitive to current issues or perhaps are living in a fantasy. The state government has already implemented all the promises offered. Among them, the promise to abolish the Government Establishment Quota (KMK) in the distribution of affordable housing. Previously it was called low-cost housing, and the exemption of hawker licence fees in all 16 Local Authorities. The implementation of these promises has also been announced through the mass media.

Indeed, yesterday afternoon I also presented the vision, mission and direction set for this state for the next 10 years. That is why I said they are like a frog under a coconut shell. They do not take notice of what is happening and only know how to oppose. If you want to know what the development plan is, come yesterday, look at today's media reports or Facebook.

All these promises have been implemented by us within the first 100 days of our administration. These promises were not merely made to win the support or votes of the people, but they truly benefit all of them. I want to clarify and stress here that the new leadership is not like the previous one, which only knew how to scatter sweet promises to win the hearts of the people and then disappointed them. I will give an example: among the promises that can be likened to scattering sugarcane at the edge of the lips, the previous government in the 2013 manifesto targeted zero squatters, 2005. However, the zero squatters agenda failed to be implemented. The previous Menteri Besar only focused on resolving squatters in the Pasir Gudang Parliamentary constituency. In my Parliamentary constituency, so many squatters remain in arrears and are increasing from time to time, as well as along the coastlines and rivers.

Another promise was to complete 121 religious schools. Due to inefficient governance, the project was abandoned until the state government had to take over 77 unfinished schools and 18 schools still within the defects liability period, to ensure that these religious schools did not become white elephant projects.

Through Kumpulan Prasarana Rakyat Johor, the state government had to bear costs of up to approximately RM240 million, involving deferred payments over the next 10 years. The question that arises is how the state government considered, at that time, appointing a company, MySis Development Sdn. Bhd., which clearly was not capable of completing the religious school project (SAKJ), so that the state government subsequently had to bear compensation. That is only a small pain that I have exposed; there are many more promises that were not implemented by the previous government.

The manifesto promises in the 13th General Election numbered 12, and only one was implemented, namely BRIM. Car prices going down, none; zero squatters, none; 15,000 affordable houses, none. Previously, we saw everything collapse: the relocation of the Orang Asli in Bekok, in Stulang, Tebing Runtuh, building affordable housing at Pendas Laut, the relocation of PTP promised to residents of Gelang Patah, Nusajaya, all did not happen. All the promises were "Janji Dicapati" (Promises Achieved). (House applauds).

Mr Speaker, now I would like to touch on the offers stated in the Pakatan Harapan manifesto, namely regarding limiting the post of Menteri Besar to no more than two terms, which was raised by the Honourable Member for Jementah and the Honourable Member for Layang-Layang. In my view, we are not in a position to oppose it. Pakatan Harapan has reached a common agreement to give a maximum tenure of two terms for the Menteri Besar to administer. This period is considered most suitable for implementing all the development plans planned. This has also been agreed at the federal level, where a person holding the post of Prime Minister also may not exceed two terms. This time limit is also made to ensure transparency in administrative affairs. This consensus was reached by the top leadership of Pakatan Harapan involving 4 parties.

Therefore, there is no need to make an amendment at this time to abolish the clause limiting the post of Menteri Besar to not exceeding two terms, solely to show our sincerity and honesty towards the people, because we in Pakatan Harapan adhere to principles and administrative policy.

Abolish the government establishment quota. I would also like to take this opportunity to answer the question raised by the Honourable Member for Semarang regarding the action of the Pakatan Harapan government in abolishing the Government Establishment Quota (KMK). This is also one of the manifesto promises that has been fulfilled. The abolition of KMK was made because it is an unfair system to the people of Johor, as this system gave almost 20% of the total affordable housing to the leaders of the previous government parties. This was then distributed to their supporters. Moreover, this KMK also provided room for abuse of power and corruption by selling KMK certificates to people at unreasonable prices. As an example that happened, as also stated by the EXCO for Housing just now, I, involving the Division Youth Chief of UMNO who was investigated under Section 420 of the Penal Code regarding a fraud case in the purchase of RMMJ. But this case disappeared, quietly just like that, quiet only. Ha, this is it, there are many other big cases, I do not want to mention them, otherwise contempt of court will occur. The state government's position is that the distribution of affordable housing must be carried out directly and fairly to all those eligible without regard to their background and political ideology. I think this giving of certain quotas is perhaps like there is something hidden behind the stone. To win voters' support, they are willing to snatch the rights of others.

Next, creating 200,000 high-skilled and semi-skilled job opportunities. Among the 10 promises of the 5-year state government is to provide 200,000 high-skilled job opportunities, which the Honourable Member for Rengit raised. For the information of Mr Speaker and the Honourable Members of the State Legislative Assembly, we are well aware that various mega projects are under construction in the state of Johor. These projects are projected to contribute continuous economic spillover to Johor for several years to come, thereby providing high-skilled job opportunities. The total of 200,000 job opportunities is not merely a figure plucked out without being evaluated and studied. Hundreds of thousands of job opportunities, a surge in property value, technology transfer and the entry of viable industries are benefits that will be enjoyed by the people of Johor. Among them, through the Iskandar Puteri, Pengerang, Pontian, Mersing projects and many more. The implementation of these projects is the catalyst that becomes the core of economic growth in South-West Johor. In Iskandar Puteri, for example, the rapid progress taking place with the aura of smart green development can be felt. Iskandar Puteri represents a new geo and the era of modernisation of Johor today. Not only does it become an advanced, modern and best city, but it is also a symbol of the enduring memory of the people of this Johor history.

In July last year, together with the Johor State Human Capital Empowerment Unit, I conducted a site visit to Medini 7, to see more closely the development progress managed by I2M Venture Sdn. Bhd. under the GBS Iskandar Programme. During the discussion session, I was informed that four new companies will set up here, offering high-skilled job opportunities. For the next four or five years, approximately 14,000 job opportunities will be created, only in Iskandar Puteri, not including other areas throughout Johor, Honourable Members.

Then, we see Pengerang, which was formerly a plantation area and fishing village, now developing rapidly. There is the Pengerang Integrated Complex project, or PIC, Pengerang Intergrated Complex. This has a comprehensive impact on the area, and even downstream economic spillover to the local community. Then, we see the development of Desaru Coast up to Tanjung Balau relating to international-standard tourism projects with well-known brands here, which are actively taking place and will also take place. Among them, the construction of Hotel Anantara, Hotel Hard Rock Café, Desaru Coast

Adventure Water Park and many more. For the first phase of this development, it will open job opportunities of more than 1,700 and a total of 4,000 by 2021. This does not include Senai, Sedenak, tourism in Mersing, Tanjung Bin, Tanjung Piai, the modernisation of livestock farming, fisheries and agriculture that can lead to job opportunities. Every manifesto or promise publicly announced to the people is interconnected. For example, when we talk about the national food production hub. Many foreign countries will choose to invest and set up their companies, operating in the state of Johor.

We welcome them to do so, but with the imposition of certain conditions to set a certain amount or quota of skilled workers from among Johoreans. This indirectly helps us achieve the target of creating 200,000 job opportunities within five years as promised, in addition to the projects I mentioned earlier.

Likewise with the aspiration to develop the Northern Johor Corridor, which is formulated based on uniqueness and distinctiveness, an area that supports sustainable development in a district or region of Johor. This is part of an example of planning that will be implemented by the state government within the 5-year administration. Therefore, in response to the Honourable Member for Panti and also the Honourable Member for Rengit, do not be worried, because I am a person who keeps promises and is responsible. (House applauds). The projects stated are high-impact projects, capable of offering high-quality jobs. We as the state government do not speak empty words or state something impossible to achieve by reason, let alone just sit idle. However, the work towards achieving the objective of the 200,000 job opportunities target, God willing, will be realised. (House applauds).

Financial Expenditure Management.

Mr Speaker, YB Jementah stated that there is concern about the financial position of the state government, which recorded a surplus but has been decreasing every year. The global economic scenario and current developments play a big role in planning economic and development management of the state. The position of the global economy will certainly have an impact on this region. On Malaysia and certainly also on the state of Johor. We need to learn from the crises of the past and strive to avoid excessive imbalances that could cause pressure on the economy and finance. Although great progress has been achieved over the past few years, enabling us to strengthen resilience and improve the fundamental development of the economy and finance. There are still many challenges to be overcome from time to time. To ensure our growth prospects, we need to be vigilant and have high capacity and determination to act through early measures in overcoming signs of weakness, risks and imbalances. The uncertainty of the global economy at this time is a very suitable time to accelerate reform measures; the main challenge of the state government is to maintain the momentum of growth in the property market in Johor, which is closely linked to state revenue of Johor. In general, the property market in the state of Johor, like most other states in Malaysia, experienced a contraction in 2017, which is one of the main sources of revenue for the state of Johor.

Based on the 2017 Property Market Report, the total transactions and total value of the Johor property market respectively decreased by 3.1 per cent and 4.3 per cent compared to 2016, with the residential subsector remaining the largest share at 64.1 per cent. The state government, through a study being conducted by the State Economic Planning Unit, expects that the property market in the coming years will remain challenging and depend on the action measures taken by the government, particularly regarding economic policy and the property sector.

Generally, state government revenue can be categorised into Recurring Revenue and Non-Recurring Revenue. Recurring Revenue is revenue collected every year such as Land Tax, Raw Water Tax, Road Charge and Interest from Fixed Deposits. Meanwhile, Non-Recurring Revenue is revenue collected only based on development projects and applications received such as payment of Land Premium, processing payments to the Land Office, licences and returns from agencies.

Overall, the financial position of the Johor state government is good. Although the surplus has decreased from 2013 until 2017, it does not affect the accumulated surplus of the Consolidated Revenue Account, which continues to record an increase. The main focus affecting the change in surplus from 2013 until 2017 is due to development projects, especially the Integrated Oil Refining and Petrochemical Development Project (RAPID) in Pengerang, Johor, which has entered the next phase, where Grant Premium payments were settled in previous years, which indirectly means large premium payments are no longer obtained. The downward trend in surplus should not be seen as something negative. Public financial management is not the same as a profit-based company that needs to increase profits from time to time. Public finance needs to focus on effective distribution, where revenue collected must be invested and reused towards productive expenditure that generates the economy of the state of Johor.

That is why there are countries that constitutionally require that their financial statements be in a balanced state only and have no surplus. However, this approach is feared to make a state unprepared with strong reserves. Therefore, the state of Johor takes the approach of implementing optimum expenditure distribution by reducing the surplus when the goal of strong reserves has been achieved. To strengthen fiscal stability by ensuring long-term financial sustainability of the state of Johor. The Johor State Treasury has called on all Government Departments/Agencies, including State Statutory Bodies and State Government Companies, to implement prudent expenditure. Namely by cutting expenditure that has no priority, such as corporate clothing of departments and programmes, and also avoiding waste in holding lavish banquets.

In addition, the state government will continue to strive to make Johor the main destination for foreign and domestic direct investment in Malaysia. This is also among the main measures to maintain the sustainability of state revenue with new and quality projects.

Direction and Development Plan. Mr Speaker, next I would like to clear up the doubts of this Honourable Member for Benut, sometimes I feel sorry about the direction of the state development plan. I feel very disappointed with the issues raised by him.

Firstly, I feel the arguments of YB Benut, who requested that all good programmes for the people be continued, are very shallow and does not understand language. This new government is not a naive government. We all have great experience (House applauds). Perhaps YB Benut is a heavy sleeper, deliberately does not want to know, has repeatedly stressed that any good initiatives will be continued and even improved based on current needs. Among them, the incentive given to Johor children who succeed in continuing their studies to the level of IPT is RM750.00. This incentive will continue and is even expanded to IPTS and its value increased to RM 1,000.00 too.

Continuing the free bus programme by adding more bus routes, among them in Muar and Pagoh which have urgent needs for the transport system to be improved, considering the rapid development in those districts as well as in other places in the process of implementation. I also do not understand why the previous government did not think about this route, because the population in that area is known to increase with the establishment of the Pagoh University Hub.

Strengthening development based on the uniqueness of districts or regions such as Muar as a furniture hub, involving the whole northern corridor of Johor. Continuing previous policies in the Malay Belt areas, with permission, especially in the Larkin industrial area to be made a Malay reserve area. I take note of YB Benut's concern in fighting for the rights of the people, but I think this is a sad statement. It seems to teach us how to administer the state government, whereas all this time we were the opposition and we also never ceased fighting for the issues of the people. No government wants to see the failure of a development plan planned for the sake of political interests. It is different with the previous government, which practised the 4P principle, "Liars, Robbers"; the other two, you think about them yourselves.

I consider the action of Honourable Member Benut like teaching a crab, teaching a young crab to walk straight. I myself am more senior than YB Benut. But I do not deny that the previous government, although labelled with "Janji Dicapati", also implemented good things. This I have repeatedly said, any good programmes for the people will be continued and even improved.

But the main challenge in implementing the development plan that I presented yesterday is integrity. After 60 years of administration, the previous government left us with many problems that we need to manage. These are among the obstacles to the implementation of the planned development programmes.

RTS and HSR Projects. Apart from that, Honourable Member Benut also requested clarification regarding projects involving cooperation between the state government and the Federal government, in which Benut stated that the state government should be firm and simply follow the decisions of the central government. The projects mentioned are the Rapid Transit System (RTS) project between Bukit Chagar, Johor Bahru and Woodlands, Singapore, and also the High Speed Rail (HSR) project. I refute this matter. The RTS project has not been cancelled and in principle will be continued. A memorandum paper related to this project will be tabled in Parliament in the near future.

But in principle, the Cabinet has approved the project. The project is estimated to cost approximately RM4 billion, but a detailed study is being carried out to identify the actual amount, considering that the state government needs to acquire land and pay compensation for the project. The state government has strong reasons to continue this project because it benefits the people. In addition, the RTS project is also one of the solutions to congestion at the Johor Causeway.

Regarding the HSR project, the Federal government did not cancel the project; rather it has been deferred for a period to allow room for a review of the project cost, which was considered too expensive, reaching RM110 billion, although initially the previous government stated that the cost of the HSR project was only RM55 billion. The central government is now at the study stage, considering the construction cost and projected job opportunities and economic benefits that are not commensurate with the cost of the project.

Mr Speaker, in commenting on this HSR project, I would also like to correct what was said by the Honourable Member for Buloh Kasap, who asked that this project be accelerated to attract foreign investors to come to Johor and thereby develop the economic sector in the areas involved. This HSR project is not merely intended to attract foreign investors to live here, but is more for foreign tourists. For example, if this project is continued, it will involve foreign workers during its construction process, but after the project is completed they will return to their respective countries.

But the result later, if this project is continued, will become an attraction for foreign tourists to come to this country and also to boost economic growth along the corridor involved.

Mr Speaker, Harapan Johor Bus and Muafakat Johor Slogan. Sedeli, Sungai Balang and Panti raised the matter of the Harapan Johor Bus. Regarding the issue of rebranding the name from Muafakat Bus to Harapan Bus. What I want to state is that any new government administration will certainly do "rebranding", with permission, to symbolise an image suitable for the new government administration. What is more important is the benefit to the people, such as recently the state government introduced a new free bus route, namely on the Pagoh-Muar route.

This route, apart from benefiting the people of Muar District, the service on this route will also greatly ease the cost of living for students at the Pagoh University Hub. This expansion is more important than the issue of renaming the brand. Mr Speaker, God willing, it is already the responsibility of the state government to ensure that this free bus incentive is expanded according to needs and the suitability of time.

I next refer to the matters raised by the Honourable Member for Kahang, the Honourable Member for Machap and the Honourable Member for Penawar regarding the use of the Muafakat Johor slogan which has no relation to politics. The new government still uses muafakat, only it has been changed to Muafakat itu Berkat. This is a tagline, with permission, of the new Pakatan Harapan government, because each leader has their own approach or identity that is adapted to the current administration. The use of the slogan Muafakat itu Berkat is also a translation of my administration and the members of the state government's council who always stand shoulder to shoulder together. I think the current leadership represents Team Johor, which symbolises true cooperation. Always working together in a team. Not like the leaders of the past who shouted the slogans of Muafakat and Team Johor but in the photos he looked at the sky, looked at the sky alone. (House applauds). Today I look, I am alone, with my EXCO team. How about that? OK? (House applauds).

Mr Speaker, I would like to answer the questions from the Honourable Member for Sungai Balang and also the Honourable Member for Panti regarding the removal and appointment of Village Heads. Although at this time the post of Village Head has not yet been filled by any individual, the state government has issued instructions for all penghulu in every State Legislative Assembly (DUN) to take on the temporary responsibility, and at the same time launch the process of state government support for the benefit of the community. The selection of Village Heads will be completed not long from now, and the Johor Government will announce the appointment of village heads for the 674 vacant posts throughout this state by early September. The selection of Village Heads this time takes a little longer to ensure that every individual appointed is truly qualified to serve the community.

The state government has conducted interviews openly and more transparently, and did not involve individuals from Political Parties as interview panellists. It only involved the District Officer, the Chief Assistant District Officer and the District KADI. This proves that the new Johor state government is not like the previous government which politicised the selection of Village Heads. (House applauds). By involving Division Chiefs and ADUNs in the selection of Village Heads, such matters will not happen under the administrative system under my leadership as Menteri Besar of Johor. The state government will ensure that individuals who are qualified based on merit are selected as Village Heads, not based solely on politics.

Next, the Honourable Member for Senggarang and the Honourable Member for Larkin raised the issue of permanent ownership of state land. The Honourable Member for Senggarang made a proposal to give permanent ownership status to leasehold land with agricultural status. The Honourable Member for Larkin also raised the issue of ownership of land and residences in the area of Larkin

Jaya and Kampung Melayu Majidee, which have been gazetted as Malay reserve areas, to be made permanent ownership.

In principle, the granting of ownership of any state land should not exceed a period of 99 years as provided under Section 76(a) of the National Land Code (KTN) 1965. The 64th National Land Council meeting on 23 December 2008 decided that permanent alienation may be considered by the State Authority, when the State Authority is satisfied that special circumstances exist in an area. This is clearly translated for reference by the State Authority through KPTG Circular No. 1/2011 (Implementation Guidelines for the Policy on Granting New Tenure Not Exceeding 99 Years for Land Held under State and Mukim Lease Status), namely:

i. Granting of state land for permanent tenure may be considered for state lands of the "pockets land" nature which are applied for and which will subsequently be consolidated with adjoining lands held in perpetuity, owned by the same landowner.

ii. Permanent alienation also applies to lands that were originally held in perpetuity but were subsequently surrendered to the government and returned to the original landowner through the Return and Re-grant (SBKS) process.

iii. Alienation in cases where the Government acquired land of permanent status under the Land Acquisition Act (PBT) 1960 but when the land is not required by the Government and is to be re-alienated to the original landowner, it is considered fair if the land is alienated in perpetuity.

For the information of the Honourable Members, in efforts to improve the welfare of the people in the state of Johor, the Pakatan Harapan manifesto during the 14th General Election, among other things, committed to granting 99-year leasehold status for Kampung Melayu, Kampung Tradisi, Kampung Tersusun and Kampung Baru. Those that are already 40 years old, after the 99 years have run out, 59 years, can apply for another 99-year extension. The places I mentioned are throughout the whole state of Johor. That is recorded in our manifesto and we have implemented it. Today, it can be applied for.

From the perspective of property valuation, this 99-year leasehold period can be said, with permission, to be as good as freehold. When the 99 years end, add another. When the 99 years end, add again. God willing, the Pakatan Harapan government will rule for 80 years, God willing this will continue. (House applauds). Moreover, the National Land Code (Amendment) Act 2016 has added Section 90A which allows landowners to apply for an extension of the lease period at any time before the end of the lease period for consideration by the State Authority.

For that purpose, the Land Administration will be asked to scrutinise and refine any applications or proposals to change the leasehold status of land for housing and agricultural sites to permanent tenure status, to be brought for consideration by the State Authority. In addition, the aspect of the premium to be imposed also needs to be examined, because there will be no more premium collection for lease extension if an application for ownership with permanent tenure is agreed.

I next refer to the issue raised by Senggarang, who is also concerned about the bauxite pollution in Batu Pahat. The development of mineral resources in the State of Johor is subject to the Johor State Mineral Enactment 2003, which has been gazetted as WKJ 880 dated 22 April 2004 and came into force on 1 May 2004. As for the Mineral Regulations 2012, they were gazetted on 14 February 2013, however WKJ No. 432. The process of issuing Mining Licences begins at the Office of the Director of Land and Mines or PTG Johor, where the applicant must prepare a complete Pre-Feasibility Study Report by a certified Consulting Engineer. Applications received by PTG will then be referred to several technical departments/agencies such as the District Land Office, the Department of Minerals and Geoscience (JMG), Plan Malaysia, the Department of Environment (JAS) and the Local Authority (PBT) before being approved.

Generally, the extraction of bauxite minerals in the State of Johor at this time is controlled and closely monitored by PTG and the relevant government departments and agencies. Nevertheless, Honourable Member for Senggarang, as a machinery of the Pakatan Harapan Government on the ground, is very responsive and sensitive to any concerns of the people, including the accumulation and distribution of bauxite in Mukim Minyak Beku, Batu Pahat. It is within the knowledge and close attention of the Johor State Government. The Land Administration, led personally by the Director of Land and Mines Johor together with the District Land Administrators and other relevant government departments and agencies, has sat at the same table in several rounds of discussions to address the issues raised. Indeed, the operators have also been summoned to be given a firm reminder to comply with approval procedures including conditions set by the technical departments.

Early actions agreed upon in several rounds of discussions include:

i. The Operator is requested to immediately comply with all conditions imposed by the technical agencies.

ii. Integrated monitoring by enforcement agencies involving PTG, PTD, JAS, JMG, JPJ will be carried out immediately.

iii. Bauxite extraction and transportation activities may only be carried out during the day, namely from 7:00 am to 7:00 pm only.

iv. To address the problem of dust and dirt pollution arising from bauxite extraction and transfer activities, the companies concerned must install wheel washers at exit points, install a perimeter drain around the bauxite accumulation and distribution area, provide a sediment containment pond, install roofing on stockpiles and ensure that lorries carrying bauxite are covered with plastic.

At the same time, the Land Administrator is requested to take early action on the breach of land conditions on agricultural-category land used as bauxite stockpile collection sites, and also the breach of reserve land lease conditions granted for private jetty purposes on Lot 3077A Mukim Minyak Beku, Batu Pahat.

The Honourable Member for Machap and Buloh Kasap also raised the issue of land ownership in their respective areas.

For the Honourable Member for Machap, the Johor Land Administration has received applications for state land from 231 people in Kampung Haji Hamzah, 408 people in Kampung Haji Paya, 245 people in Kampung Seri Maju Jaya and 203 people in Kampung Bukit Nyamuk.

For the Honourable Member for Buloh Kasap, the Johor Land Administration has received applications for state land from residents in Jelebak, Ladang Bukit Bujang 1 and Bukit Bujang 2.

For both cases above, these applications have been processed at the District Land Office level and these applications will be brought for consideration by the State Authority in 2018. For the information of the Honourable Member, this administration has set a target in the Key Performance Index (KPI) for resolving these collective land applications in 2018.

Bukit Naning and Yong Peng raised the issue of land ownership in their areas. Permanent alienation for eligible applicants is in accordance with the conditions and provisions set out in the National Land Code 1965. Approval of this permanent alienation falls under the jurisdiction of the State Authority in accordance with the provisions of Section 42 and Section 79 of the National Land Code 1965. The Johor Land Administration stresses that there was no error in the procedure for granting ownership of these lands, as it was carried out according to the proper procedure and done in good faith without any interest in accordance with the provisions under Section 22 of the National Land Code 1965 for the welfare of all parties.

Based on the records of the District Land Office, no official complaint has been received regarding overlapping of ownership titles as stated by Bukit Naning and Yong Peng. The Johor Land Administration also does not deny that there are isolated cases where earlier grants did not take into account the boundaries of crops that had been cultivated or buildings that had been erected before the grant was given. However, the Johor Land Administration is ready to assist in resolving this matter and requests the landowners concerned to come forward to the District Land Office to facilitate the resolution action. For the application for state land at Bukit Betaling, Mukim Chaah, District of Batu Pahat, the State Authority has given a decision to the applicant.

In addition, the State Authority has the right to dispose of state land by means of granting a Temporary Occupation Licence or LPS to allow lawful occupation under the provisions of Section 65 of the National Land Code 1965. If the state land has been encroached upon with permanent crops, namely oil palm, the State Authority may issue a Temporary Occupation Licence (LPS) or Tapping Right to collect the yield of the crop at a rate of RM10.00 to RM100.00 per tree per year, depending on the type of crop and age of the crop, as per PTG Circular No. 1/2008.

In addition, the State Authority has also set a Supplementary LPS payment, namely a penalty for applicants who have encroached upon state land. The payment of LPS and the Supplementary LPS are very low compared to the revenue obtained.

The State Government thanks the Honourable Member for Senggarang for his attention and views regarding the issue of extraction activities of rock materials or minerals taking place on river banks. As is commonly known, sand extraction from rivers is an activity that has been carried out for a long time. Sand is a main material in the construction industry, especially involving concrete structures and roads. The most abundant and easily obtained source of sand is from the riverbeds found in this state. In order to preserve the state's treasures including land and water resources, I am committed to ensuring that any applications related to extraction activities of rock and mineral materials in the state of Johor will be examined holistically before any approval is given. This is to ensure that the state's treasures can not only generate revenue for the state government which can be used for development programmes and improving the welfare of the people, but also at the same time do not compromise environmental sustainability.

Referring to the issue of sand extraction at FELDA Tenggaroh 13, Mersing, preliminary checks found that it occurred on PTD 207 and PTD 15206 Mukim Tenggaroh and Lot 20473 Mukim Mersing. All three lands are owned by the Federal Land Development Authority (FELDA) and leased in their entirety to FELDA Global Ventures Plantation (Malaysia) Sdn Bhd. There are applications for permits for extraction and transfer of rock material (sand) and from several companies that were granted permission by FELDA to carry out sand extraction works. The applications under Section 71 and 72 of the National Land Code have obtained approval from the Mersing Land Administrator on 6 February 2018 and the approval will expire on 31 December. However, if there is a breach of any approval conditions, the Land Administrator may take enforcement action including cancelling the approval.

The Honourable Member for Panti also raised the issue of illegal and unauthorised sand mining along the rivers. For the information of the House, the decision of the Johor State Executive Council Meeting agreed that the Johor Water Regulatory Body (BAKAJ) carry out maintenance work of dredging river sand at the Johor River Barrage near Kampung Panti and Kampung Kelantan. This is to ensure the depth of the river is at the 4.0 metre level. Thus, a contractor has been appointed to carry out river flow stabilisation works through the method of river sand dredging. The Kota Tinggi District Land Office has issued a 4C permit, namely the transfer of rock material, which is river sand, to the contractor concerned. Monitoring is constantly carried out by the Johor Land Administration and the Johor Water Regulatory Body (BAKAJ) to ensure the contractor concerned complies with the rules and guidelines set. The Drainage and Irrigation Department (JPS) and the Johor Water Regulatory Body (BAKAJ) will take action by directing the contractor concerned to repair the riverbank if there is bank collapse. In addition, this administration's review found that there is no river sand extraction operation at Kampung Orang Asli Sayong Pinang. However, the Johor Land Administration welcomes information from the community so that monitoring and enforcement can be carried out properly and effectively.

The Honourable Member for Kahang raised the issue of the application for paddy land at Kampung Sri Lukut. The paddy area in the Kampung Sri Lukut area is a paddy reserve area as per the Kahang Irrigation Area with an area of 880 acres, equivalent to 356.124 hectares. Plan gazette G 1-51 Gazette No. 319 dated 27.04.1950. The application in question is being processed at the Kluang District Land Office and is awaiting comments from the technical departments, namely the Agriculture Office and the Drainage and Irrigation Department. This application will be brought for consideration by the State Authority and the state government may consider whether to grant ownership, grant a Temporary Occupation Licence (LPS) or lease reserve land under Section 63 of the National Land Code 1965.

Monitoring of GLCs and Government Agencies and Statutory Bodies. Next, I would like to answer the questions of Mengkibol and Larkin regarding suspicious projects under the previous state government. The State Government constantly monitors and examines financial management, especially involving suspicious projects under the implementation of the previous government. It is already the responsibility of the State Government to ensure that state government finances are not misused at all. The proposal to set up a special committee specifically on this issue will be considered to ensure there is no overlap of responsibilities between the State Public Accounts Committee and the Johor State Auditor General's Department. If this special committee becomes a necessity, the state government will announce it. If Honourable Members have any information regarding suspicious projects, they may report directly to the State Public Accounts Committee and the Auditor General's Department, Johor state, for follow-up action.

In addition, the state government also plans to conduct a forensic audit, with permission, on suspicious projects. However, this matter is still being considered after taking into account the rather high cost of appointing consultants, besides being concerned that the final report prepared by the consultants may be biased in favour of those with interests.

Pulau Batu Putih. Next, I would like to answer the questions raised by the Honourable Member for Benut and Layang-Layang regarding the stance of the Johor government on the decision of the central government not to continue the appeal of the International Court of Justice (ICJ) decision relating to the 2008 decision on the sovereignty of Pulau Batu Putih to Singapore. The state government has always been consistent and determined in defending the sovereignty of Pulau Batu Putih. Moreover, Pulau Batu Putih is within the area of the state of Johor. I have often met YAB Tun Dr. Mahathir Mohamad, Prime Minister of Malaysia, to discuss the above issue, since the Pakatan Harapan government took over the government of Johor and the federal government. This is because, negotiations

...application to review the claim over Pulau Batu Putih under the jurisdiction of the federal government. The Johor State Government has always supported all decisions of the federal government regarding the Pulau Batu Putih claim. So, there is no point in saying that I do not know history, that I just sat still and took no action. Even in the past, the state government also took its cue from the federal government. We have the Most Honourable Prime Minister. I have to refer back and discuss. This came out in the newspapers, slander, saying I do not know history. I did not do anything. Whatever he did not do in the past, I never bothered to disturb either. Go ahead, do your worst. The central government has carefully studied whether to decide not to pursue an appeal against the ICJ decision. Pulau Batu Putih has been a point of conflict in the issue of the overlapping maritime territory of Malaysia and Singapore for a long time. The ICJ decision on 23 May 2008 favoured Singapore. Although the issue of the distance of the waters between Batu Putih and Johor is closer, the ICJ examined it from various other aspects.

The Pakatan Harapan Government feels that the Barisan Nasional government was always careless and did not care about Pulau Batu Putih at one time in the past. This is because, based on the summary of judgment No. 2008/1 for the judgment dated 23 May 2008, the Johor state government at that time merely kept silent when Singapore installed communication equipment in 1977 and ignored Singapore's proposal to carry out land reclamation in the waters of Batu Putih. So, who was not alert? Who turned a blind eye? Answer that. Johor also did not make any markings of ownership over the island. That action caused the opportunity to reclaim the island to become extremely slim, and the cost of claiming it now is high. What's done is done. The Pakatan Harapan Government is determined to ensure there are no more external efforts to challenge the sovereignty of Johor. We will defend it to the death if there are those who try to challenge the sovereignty of the State of Johor. However, the state government has certain strategies to ensure the sovereignty of this state is always protected.

Mr Speaker, Illegal Logging Activities. I would like to answer the question of the Honourable Member for Senggarang, who stated that there is much leakage in logging activities. The confusion that has occurred as a result of non-compliance with standard work procedures (standard of procedure), as raised by the Honourable Member, may stem from individual (human) problems. This matter has previously been raised by the Malaysian Anti-Corruption Commission (SPRM). In tackling this issue, the State Government together with the relevant Department often carries out programmes and activities that can enhance the integrity of civil servants, such as talks and dialogues with SPRM. If there is any misconduct or any officer who violates regulations and is involved in integrity issues, such as colluding with contractors in carrying out unhealthy activities, the Department will not hesitate to take action against the staff involved. Moreover, if found guilty, they will be subject to further action and referred to the Disciplinary Board or the Police.

Apart from that, the Department always carries out road blocks together with the Royal Malaysia Police (PDRM) and the Road Transport Department (JPJ) to check timber transport vehicles to see whether the valid timber transfer permits are held by them, in order to prevent leakage through the removal of timber without payment of taxes. For the information of the Honourable Member for Senggarang, from 2015 to 2017 the Department has carried out three (3) rounds of job rotation or transfers for forestry officers in the support group, grades G19 to G29, specifically for officers who have served for more than 5 years at one place, in order to provide a fresh working environment. This is also in line with the recommendation of the State Authority and SPRM that any officer in areas that are the focus of attention (hotspots) must not serve more than three (3) years at the same place. All complaints received will be investigated and, if found guilty, the offenders will be brought before the court in accordance with the provisions of the Enakmen Perhutanan Negara (Pemakaian) 1984 Negeri Johor or any other applicable legislation and circular orders.

Security Portfolio. Speaking of this security matter, I would like to thank the Honourable Member for Benut, who is also the Leader of the Opposition. Benut also showed concern over the absence of a security portfolio in the leadership of the Pakatan Harapan State Executive Council. I want to ask, is the Benut area not very safe? If it is not safe, perhaps the Honourable Member for Benut is not doing his job, together with his Member of Parliament, what's his name, GST, if GST is implemented, that goods... I want to ask, did Benut not notice that the Barisan Nasional State Executive Council line-up also had no security portfolio? This august House need not worry about the absence of this security portfolio.

For everyone's information, I will chair the State Security Meeting three times a year. In fact, I plan to increase the number of meetings to five times a year. I am also Chairman of the State Security Council. In the meeting, all security agencies will report on the latest status of security and the possible threats that may arise from time to time.

Apart from that, I will chair the State Action Committee Meeting. In the meeting, every head of department reports on departmental issues, including the security agencies present in the State of Johor. I urge Benut to think for a moment before asking other questions next time.

The UMNO building issue. Mr Speaker, I would like to raise again the issue of the UMNO building at Jalan Segget, Mukim Bandar Johor Bahru. Do the Honourable Members know who the owner of the land and building is? The first owner of the building was Pertubuhan Kebangsaan Melayu Bersatu. Who holds it now, only God knows. Not even its soul knows, Pertubuhan Kebangsaan Melayu Bersatu Baru. NEW! But it was a sleight of hand, the word baru that was there, the word baru was removed. So the owner of the land is the old Pertubuhan Kebangsaan Melayu Bersatu. Already illegal. Already illegal. You take the property of a dead person, can you claim it as your own property? Is there a will? (The House laughed and applauded.) A will? I know all these properties were frozen by the old UMNO a long time ago. Except for those who became People's Representatives, some of the new ones do not know the history. In 1989, in 1988, UMNO was banned. It was already frozen. Yet they claim it as theirs. Has such a thing ever happened?

The owner of the building is Dato' Haji Salleh bin Tahir, the late Haji Rahman bin Mahmod and the late Tan Sri Dato' Osman bin Saat, former Menteri Besar. The above-named persons were also the trustees of the UMNO Johor State Liaison. I do not deny that any land may be held in trust by trustees appointed under the clauses of the provisions of a society or association law concerned and registered as stated under Section 344, KTN 1965. What is doubtful is that all the trustees have returned to the Mercy of God. In the event that the names of those trustees have passed away, the association must decide through a meeting. Even then, if possible, based on association law, to change the name of the trustee to a new trustee for registration. So, all these people have all passed away. They are no longer here. The old UMNO is already banned. Yet they claim it as theirs. Managing even this small asset is already a problem, so how can they manage state administration? That is why they lost in GE14. If we look further at UMNO buildings in Johor. The UMNO Batu Pahat division building has land tax arrears amounting to RM287,000.00. They were given it, yet did not pay the tax. They want to grab it. The UMNO Tebrau Division building, RM31,000.00.

For the two cases above, the state government will send a Notice of Reversion of Land to the Government, Form 8A under Section 130, KTN. In fact, there are many more cases of UMNO buildings that were granted but have land tax arrears. There is a basis for my raising the issue of political building sites. Our intention is not to defame or look for faults in the opposition. As leaders, we must show a good example to the people. Do not just be clever at politics and attack the government of today.

Whereas when they were in government before, the pihak pembangkang failed to fulfil even the basic duty of a citizen, which is to pay taxes. How can the people trust UMNO again to administer this state?

In conclusion, I apologise for any mistakes. Any questions or proposals of the Honourable Members that I did not have time to mention or answer, do not feel aggrieved, because the State Government will surely study them again. We have at least four more years. The issues raised and debated in this honourable House are not intended to topple any party. Rather, these differences of opinion will ultimately benefit the people of this state.

I end my winding-up speech with two pantun for us to reflect on together as the people of Johor.

Old words, useful words, many benefits can be felt; a nation without consensus is shameful, without consensus, the people perish.

Old words, lucky words, good fortune clings to all the world; a nation is shamed because it is weak, weakness arising from not being of one mind.

Wabillahitaufik walhidayah wassalamualaikum warahmatullahi wabarakatuh. Thank you and good afternoon.

SpeakerEN

Thank you, the Most Honourable. The motion before this House is that the following address of thanks be presented to His Royal Highness the Sultan of Johor: "Ampun Tuanku, it is this servant, the Speaker and Members of the State Assembly sitting today, who have resolved to humbly convey our highest gratitude for the consent of His Royal Highness the Sultan of Johor to come to this honourable House and thereafter to graciously officiate at the Opening of the First Session of the Fourteenth Johor State Assembly."

The motion is put for a decision. Honourable Members who agree, please raise your hands; those who do not agree. The motion is carried.

Establishment of the Committee on Standing Rules and Orders of the Johor State Legislative Assembly

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Mr Speaker, I beg to move the motion that this House, pursuant to Standing Order No. 103, the Standing Rules and Orders of the Johor State Assembly, resolves to establish the Committee on the Standing Rules and Orders of the Johor State Assembly with the following membership:

The Speaker of the Johor State Assembly, Honourable Tuan Suhaizan bin Kaiat as Chairman, Honourable Tuan Ee Chin Li, Honourable Tuan Cheo Yee How, Honourable Tuan Md. Ysahrudin bin Kusni, Honourable Tuan Dr. Sulaiman bin Mohd Nor, Honourable Tuan Tosrin bin Jarvanthi, Honourable Tuan Vidyananthan a/l Ramanadhan, Honourable Tuan Haji Ayub bin Jamil, Honourable State Legal Adviser of Johor.

This Committee is responsible for examining and recommending amendments to the Standing Rules and Orders of the Johor State Assembly to the State Assembly. The quorum for this Committee is the Chairman and 3 Members. Mr Speaker, I beg to propose.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Honourable Members who agree, please raise your hands; those who do not agree. The motion is carried.

Establishment of the Committee on Rights and Freedoms of the Johor State Legislative Assembly

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Mr Speaker, I beg to move the motion that this House, pursuant to Standing Order No. 103, the Standing Rules and Orders of the Johor State Assembly, resolves to establish the Committee on the Rights and Privileges of the State Assembly with the following membership:

The Speaker of the Johor State Assembly, Honourable Tuan Suhaizan bin Kaiat as Chairman, Honourable Puan Chew Peck Choo, Honourable Tuan Ng Yak Howe, Honourable Tuan Mohd Solihan bin Badri, Honourable Tuan Muhammad Taqiuddin bin Cheman, Honourable Tuan Gopalakrishnan a/l Subramaniam, Honourable Tuan Haji Abd. Taib bin Abu Bakar, Honourable Tuan Raven Kumar a/l Krishnasamy, Honourable State Legal Adviser of Johor, Honourable State Financial Officer of Johor.

This Committee has the role of considering any matters touching on the powers, rights and privileges of the State Assembly that are referred to it by the State Assembly, and thereafter issuing a statement on them to the State Assembly. The quorum for this Committee is the Chairman and 3 Members.

Mr Speaker, I beg to propose.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Honourable Members who agree, please raise your hands; those who do not agree. The motion is carried.

Establishment of the Public Accounts Committee

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Mr Speaker, I beg to move the motion that this House, pursuant to Standing Order No. 110(2), the Standing Rules and Orders of the Johor State Assembly, resolves to establish the Public Accounts Committee, consisting of one Chairman and not more than six Members, as follows:

Honourable Tuan Tan Chen Choon as Chairman, Honourable Tuan Mohd Izhar bin Ahmad, Honourable Tuan Dr. Chong Fat Full, Honourable Tuan Muhammad Said bin Jonit, Honourable Tuan Haji Rasman bin Haji Ithnain, Honourable Dato' Zulkurnain bin Haji Kamisan, Honourable Dato' Ir. Syed Sis bin Syed Abdul Rahman.

This Committee is responsible for examining the accounts showing the appropriation of money granted by the State Assembly for public expenditure. It examines the accounts laid before the State Assembly in such manner as this Committee thinks fit. It examines the Report of the Auditor General laid before the State Assembly in accordance with clause (2) of Article 107, Federal Constitution. It scrutinises any accounts that may be referred to it by the State Assembly. This Committee will also from time to time issue statements or reports on the examinations carried out for presentation to the State Assembly. The quorum for this Committee is the Chairman and 3 Members.

Mr Speaker, I beg to propose.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Honourable Members who agree, please raise your hands; those who do not agree. The motion is carried.

Supplementary Appropriation Enactment Bill for Year 2018.Bill

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Mr Speaker, I beg to move that the Bill entitled Enakmen Perbekalan Tambahan Tahun 2018 be read a first time.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Mr Speaker, I second the motion.

SpeakerEN

This Bill is read a first time.

ClerkEN

An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional services expenditure for the year 2018 and to appropriate that money for certain specified purposes.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Mr Speaker, I beg to inform the House that I will move the motion for the second reading of this Bill today. And I move the motion that Standing Order 112(2) be suspended temporarily so that the consideration of this Bill at its other stages can also be completed today.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Honourable Members who agree, please raise your hands; those who do not agree. Standing Order 112(2) is suspended temporarily.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Mr Speaker, I beg to move that this Bill be read a second time now.

Mr Speaker, this additional allocation is the first supplementary provision for the Supply Expenditure for the Year 2018. The additional allocation required is RM14,243,000.00, as provided for in the Supplementary Supply Enactment under four (4) Committees as follows:

1. Committee on Natural Resources, Administration, Finance, Planning and State Economic Development

Johor - RM8,990,000.00.

2. Committee on Health, Environment and Agriculture - RM450,000.00.

3. Committee on Islamic Religious Affairs and State Education of Johor RM3,263,000.00.

4. Committee on Women's Development and State Tourism of Johor RM1,540,000.00.

Further explanation of these additions will be given at the relevant Committee stage.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Mr Speaker, I second the motion.

SpeakerEN

The motion before this House is that this Bill be read a second time now.

Honourable Members who agree, please raise your hands; those who do not agree. This Bill is read a second time.

ClerkEN

An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional services expenditure for the year 2018 and to appropriate that money for certain specified purposes.

SpeakerEN

The House Resolves Itself into Committee.

Clerk

JADUAL

ChairmanEN

The matter before this Committee is that the sum of RM8,990,000.00 for Expenditure Head B.03, State Secretary's Office, shall form part of the Schedule to this Bill.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

The Honourable Member, Mr Speaker, under Supply Purpose B.03, Office of the State Secretary of Johor, Management Division, RM325,000.00 is allocated. RM151,000.00 is required to cover payment of remuneration to the department's contract staff, while the remaining RM174,000.00 is required to cover payment in lieu of leave to permanent and contract staff of the department.

Under Supply Purpose B.03, Office of the State Secretary of Johor, Miscellaneous Services, RM4,860,000.00 is allocated to cover expenditure on professional services and other services purchased, and the department's hospitality.

Under Supply Purpose B.03, Office of the State Secretary of Johor, Domestic Grants, RM489,000.00 is allocated to cover other financial benefits expenditure for the Speaker and newly appointed Members of the Executive Council, under Dewan Negeri Johor.

Under Supply Purpose B.03, Office of the State Secretary of Johor, Domestic Grants, RM3,316,000.00 is allocated to cover operating expenditure of Perbadanan Taman Negara Johor arising from the cessation of revenue collection at Taman Laut Iskandar, and also to cover emolument expenditure of Perbadanan Johor Bioteknologi Dan Biodiversiti Negeri Johor.

ChairmanEN

The matter is put forward for decision. Members who agree, please raise your hands; those who do not agree. The matter is agreed to.

The matter before this Committee is that the sum of RM450,000.00 for Supply Head B.10, Department of Veterinary Services, shall form part of the Schedule to this Bill.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Under Supply Purpose B.10 – Johor State Department of Veterinary Services (Jabatan Perkhidmatan Veterinar Negeri Johor), RM450,000.00 is allocated to cover capital asset expenditure due to the relocation of the Johor State Department of Veterinary Services office from Kota Iskandar to the Complex

Jabatan Perkhidmatan Veterinar Negeri Johor at Jalan Padi Bahagia, Bandar Baru UDA, Johor Bahru.

ChairmanEN

The matter is put forward for decision. Members who agree, please raise your hands; those who do not agree. The matter is agreed to.

The matter before this Committee is that the sum of RM3,263,000.00 for Supply Head B.21, Department of Islamic Religious Affairs (Jabatan Agama Islam), shall form part of the Schedule to this Bill.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Under Supply Purpose B.21, Johor State Department of Islamic Religious Affairs (Jabatan Agama Islam Johor), RM3,263,000.00 is allocated under the Islamic Education Division. RM1,235,000.00 is required to cover expenditure on professional services and other services purchased and the department's hospitality, while the remaining RM2,028,000.00 is required to cover payment of Special Financial Assistance and payment of Special Financial Assistance in conjunction with Hari Raya Aidilfitri extended to KAFA teachers.

ChairmanEN

The matter is put forward for decision. Members who agree, please raise your hands; those who do not agree. The matter is agreed to.

The matter before this Committee is that the sum of RM1,540,000.00 for Supply Head B.23, Department of Social Welfare, shall form part of the Schedule to this Bill.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

The Honourable Member, Mr Chairman, under Supply Purpose B.23, Johor State Department of Social Welfare, RM1,540,000.00 is allocated to cover the department's domestic grants expenditure due to the increase in recipients of General Assistance, payment of Special Financial Assistance and payment of Special Financial Assistance in conjunction with Hari Raya Aidilfitri extended to Supervisors and Officers of PDK throughout the state of Johor .

ChairmanEN

The matter is put forward for decision. Members who agree, please raise your hands; those who do not agree. The matter is agreed to.

The Schedule shall form part of this Bill.

Clerk

FASAL 2

ChairmanEN

The matter before this Committee is that Clause 2 shall form part of this Bill. Members who agree, please raise your hands; those who do not agree. The matter is agreed to.

Clause 2 forms part of this Bill.

First Clause

ChairmanEN

The matter before this Committee is that the First Clause shall form part of this Bill.

The matter is put forward for decision. Members who agree, please raise your hands; those who do not agree. The matter is agreed to.

The First Clause forms part of this Bill.

ChairmanEN

The Dewan Negeri resumes its sitting.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

The Honourable Member, Mr Speaker, I would like to inform the House that this Bill has been considered in the Committee of the Whole House clause by clause and agreed to without amendment; I therefore move that this Bill be read a third time and passed now.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

The Honourable Member, Mr Speaker, I second the motion.

SpeakerEN

The motion before this House is that the Bill entitled Enakmen Perbekalan Tambahan Tahun 2018 be read a third time and passed now.

The motion is put forward for decision. Members who agree, please raise your hands; those who do not agree.

This Bill is read a third time and passed.

ClerkEN

Be it hereby enacted by the Dewan Negeri Johor as follows:- This Enactment may be cited as the Enakmen Perbekalan Tambahan Tahun 2018.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

The Honourable Member, Mr Speaker, I move that this House be adjourned.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

The Honourable Member, Mr Speaker, I second the motion.

SpeakerEN

Alhamdulillah, we have completed the business for today. Insya-Allah, we shall meet again at another time. Before I adjourn this Sitting, all Honourable Members, Heads of Department and all who are present are invited to the luncheon at the Dewan Bankuet shortly.

Honourable Members, I adjourn this House until a date to be fixed later.

The sitting is adjourned at 1.00 p.m.

Duty Officers:

SpeakerEN

Scribe Cik Hajah Shubanah binti Yusuf

Assistant Scribe Encik Hasnul Atmam bin Othman Puan Farrah Diana binti Mohammad

Coordinator Puan Asiah binti Moklis

Head of House Unit Puan Norliza binti Md. Aris

Publication Assistants Puan Malina binti Mohd Nasir Puan Noraisah binti Mohd Yusof Encik Ariff bin Abu Bakar

Office Secretaries (House Reporters) Puan Hajah Zalinah binti Ali Puan Hajah Saniah binti Kassim Puan Hajah Azlin binti Bahrin Puan Junaidah binti Paing Puan Hajah Rumiah binti Semirono Puan Siti Rojimah binti Abd. Razak Puan Hajah Haironisha binti Zainal Abidin Puan Noor Dalilah binti Dahalan Puan Zahiti binti Mohd. Hamdi Puan Suriati binti Abdul Hajar Puan Norhafizah binti Osman Puan Hajah Fareza binti Musa Puan Norazilawati binti Masri Cik Nur Adeliah binti Abidi Puan Raihanah binti Ismail

Operations Assistants (Bentara) Encik Razine bin Sulaiman Encik Hamdan bin Markom Encik Norhayadi bin Hussien Encik Muhamad Khirunizam bin Pahmi Encik Mohd Norazri bin Kasim Encik Mohd Sapri bin Manan Encik Muhamad Khairul Asyraf bin Abdullah Encik Muhammad Khairul bin Arop

Recording Encik Abdul Rahman bin Elias Encik Nor Risam bin Esa Encik Azizan bin Md. Sidi

Video Audio Operator Encik Noorazhan bin Mohd Salleh

Technician Encik Mohd Faizal bin Jaffar

State Assembly Unit, Johor State Assembly Hansard Office

SpeakerEN

~Official Opening DNJ 2018~