Johor · 9 December 2018

1st session, 3rd meeting · 283 turns · 25,918 words · official PDF ↗

265 of 283 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.

Announcement from the Honourable Speaker.

SpeakerEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi taala wabarakatuh and salam sejahtera. (Recitation of selawat). Alhamdulillah, today we have reached the last day of the Third Meeting of the 2019 Budget and the First Session of the Fourteenth Johor State Legislative Assembly. Today we will also hear the winding-up by the Most Honourable Menteri Besar on the matters raised by all the Honourable Members.

Oral Questions.Questions

SpeakerEN

The Honourable Bentayan, please.

Tuan Ng Yak HoweDAP · PHBentayanEN

The Honourable Mr Speaker, Question Number 1.

What action will the government take against illegal dumping sites that pollute the environment?

SpeakerEN

The Honourable EXCO Member, please.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, the Honourable Mr Speaker. Thank you to the Honourable Benyatan for the question raised. The Honourable Mr Speaker, as I have said in this august House, in the state of Johor we have handed over the power of monitoring and the authority over all matters relating to waste disposal, which will be maintained and monitored by SW Corp. However, the government always works together with SW Corp to ensure that environmental cleanliness and beauty are preserved.

The Honourable Mr Speaker, SW Corp will always strive to combat illegal rubbish hot spots in every district through the implementation of monitoring and enforcement operations from time to time. Joint operations with other agencies are also carried out. However, the problem of illegal rubbish continues to recur. SW Corp also advises the public not to dump rubbish or construction materials resulting from renovation activities in locations that are not permitted. Such waste must be sent and disposed of at approved disposal sites.

For the information of the Honourable Member, the total number of summonses issued to irresponsible parties under Section 71 Subsection 1 of the Solid Waste and Public Cleansing Management Act in 2018 was RM54,000.00 throughout 2018.

That is, a total of 3 cases were brought to court. All of these occurred this year, and these are among the first cases brought to court. On 28 October last year, the offender was found guilty and fined RM16,000.00. On 12 August last, RM18,000 was imposed as a fine. And on 8 July, the offender was found guilty and fined RM20,000.00. And there are 2 more case mentions that will be brought to court in early December. In fact, the reason is that while we are sitting in this August House, there is a case mention ongoing at the Johor Bahru Sessions Court.

Furthermore, there will also be case mentions for offences under Section 71 Subsection 1 of the Solid Waste and Public Cleansing Management Act in court. I call on everyone, including contractors and members of the public, not to dump rubbish at illegal disposal sites. If found guilty, these irresponsible parties will be fined not less than RM10,000.00 and not more than RM100,000.00, or imprisoned for a term of not less than 6 months and not more than 5 years, or both, under the same Section.

Finally, I also call on landowners not to allow members of the public or contractors to dump rubbish on their own land and cause nuisance. If found guilty, the irresponsible party will be fined not less than RM10,000.00 and not more than RM100,000.00, or imprisoned for a term not exceeding 5 years, or both, under Section 75 Subsection 1 of the Solid Waste and Public Cleansing Management Act 2017. Thank you.

Speaker

Ya Bentayan.

Tuan Ng Yak HoweDAP · PHBentayanEN

The Honourable Mr Speaker, I ask the Honourable EXCO Member to state so far how many locations have been identified in the state of Johor, how many of these illegal rubbish locations have been subject to cleaning action, and how many are inactive. Thank you.

SpeakerEN

The Honourable EXCO Member, please.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, Mr Speaker, and thank you to the Honourable Bentayan. At present, a total of 320 hot spots across the entire state of Johor have been identified by SW Corp. As a result of the surveillance operations carried out up to this year, of these 320 locations, 275 locations have been cleaned and are inactive. Meanwhile, there are 45 locations that remain active, and operational arrangements are being actively planned to apprehend offenders who dump illegal rubbish in places that are not permitted. For the information of this August House, we have found that the main cause of most of these hot spots is the dumping of construction waste by renovation contractors. Therefore, the government is taking proactive steps to provide a waste disposal facility with this, so as to resolve the problem of illegal rubbish more effectively.

Speaker

Ya Senggarang.

Tuan Ir. Khairuddin bin A. RahimAMANAH · PHSenggarangEN

The Honourable Mr Speaker, the Most Honourable Menteri Besar, and the Honourable EXCO Member who has given the answer. I would like to ask, I have raised for several months now the matter of illegal rubbish dumping at Bukit Kelicap. Is the Honourable EXCO Member confident in what SW Corporation has done, given that until now no action has been taken? Thank you.

Speaker

Jemput EXCO.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, the Honourable Member, for the question raised. For the information of this August House, the issue at Bukit Kelicap is in fact a long-standing one. It is no longer an approved disposal site; it was indeed one before, but it has been closed. It has been closed, and the problem now is not at the Bukit Kelicap site but on the adjacent land lot. Monitoring work is constantly carried out by SW Corp to apprehend and also fine anyone carrying out these irresponsible activities.

SpeakerEN

The next question is from the Honourable Tanjung Surat.

The Honourable Mr Speaker, my question is Question Number 2.

Has the process of appointing new Village Heads across the entire state of Johor been fully completed?

SpeakerEN

The Honourable EXCO Member, please.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Thank you, the Honourable Mr Speaker. Assalamualaikum warahmatullahi taala wabarakatuh. The Honourable Mr Speaker, the Most Honourable Dato Menteri Besar, the Honourable Members, all of you. Thank you to the Honourable Tanjung Surat for the question raised.

For the information of the Honourable Member, the total number of Village Head posts in the state of Johor is 670 persons. The number of Village Head posts for all districts in the state of Johor is as follows. Johor Bahru 45 persons, Muar 96, Batu Pahat 173, Segamat 59, Kluang 38, Pontian 88, Kota Tinggi 50, Mersing 28, Tangkak 73, Kulai 20, making the overall total 670. For the information of this August House, a total of 3 villages have been frozen or abolished, namely 2 villages in Kota Tinggi and 1 other village in Mersing. Such freezing is usually because the current population has declined from its original number.

The appointment of Village Heads in the state of Johor began on 16 October 2018 and the appointment process is still continuing up to now. The appointment of Village Heads is being implemented in stages in accordance with the procedures outlined in the Johor Government General Circular Number 3 of 2018, which is currently in force. For the first phase of appointments to the post of Village Head, 546 Village Head candidates were endorsed by the Most Honourable Dato Menteri Besar. Of this total, 15 Village Head candidates withdrew for various reasons such as illness, being appointed as a Councillor, and family and work commitments.

For the second phase, another 81 Village Head candidates were endorsed by the Most Honourable Dato Menteri Besar, and up to now, 612 Village Heads have been appointed and endorsed, which in percentage terms is 92%. The Village Heads have been endorsed by the Most Honourable Menteri Besar of Johor. However, there are still Village Head posts that need to be re-advertised for various reasons, for example candidates who succeeded but declined the appointment as I mentioned earlier, no suitable candidates, or candidates who attended the interview were found to be unqualified.

The re-advertisement process for the Village Head posts is ongoing, covering a remaining 55 Village Heads across the entire state of Johor. The appointments so far by district are as follows: Johor Bahru has had 35 appointments made, Muar has had 96 appointments made, Batu Pahat 164; Segamat 52; Kluang 37; Pontian 83; Kota Tinggi 38; Mersing 27; Tangkak 63; Kulai 17. The filling of Village Head posts in each district of the state of Johor is, God willing, expected to be completed before the end of this year.

The Honourable Mr Speaker, for the information of this August House as well, for the post of Community Head there are 123 posts for Community Heads of the Chinese, Indian, and also Sabah and Sarawak communities. Of this total, 107 Community Heads, consisting of 109 Chinese Community Heads and 9 Indian Community Heads across the entire state of Johor, have been appointed and endorsed by the Most Honourable Menteri Besar. The number of Community Head posts remaining is only 16, making the appointments represent 87% of the existing Community Head posts. Thank you, Mr Speaker.

Speaker

Tanjung Surat.

In my area there are 13 Village Heads, 7 finished, leaving 6. There is one in the Taman Bayu Damai area; previously it was 7 villages, and among those 7 villages there were only 3 original Village Heads. Now, going to Taman Bayu Damai, 1 village has been appointed a Village Head, namely Sungai Kapal, while Kampung Teluk Empang and Kampung Jawa have not yet been appointed. I want to ask the EXCO whether it will be the word just mentioned, frozen, merged, or what will happen to the case at Taman Bayu Damai, because it is now only functioning as a housing estate, whereas before it was villages, 7 villages with only 3 Village Heads roaming about. Thank you.

SpeakerEN

The Honourable EXCO Member, please.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Thank you for the supplementary question from the Honourable Tanjung Surat regarding the Village Head of Bayu Damai, which originally had 3 villages. I do not have a list of names of those villages, but we have made an adjustment to the Village Head posts. God willing, I will give the decision on that adjustment to the Honourable Member in writing.

SpeakerEN

The next question is from the Honourable Perling, please.

Tuan Cheo Yee HowDAP · PHPerlingEN

The Honourable Mr Speaker, my question is Question Number 3.

To what extent is the state government serious about developing the creative economy industry in Johor?

SpeakerEN

The Honourable EXCO Member, please.

Tuan Sheikh ‘Umar Bagharib bin AliDAP · PHChairman of the Committee on Information, Entrepreneur Development, Cooperatives and Creative Economy · PalohEN

The Honourable Mr Speaker, thank you also to the Honourable Perling for the question put forward. The Honourable Mr Speaker, after the new government was formed following the Fourteenth General Election, Johor became the first state to establish a Creative Economy Portfolio. This is a new benchmark both at state and federal levels, and this step is a serious commitment by the Johor state government in meeting new challenges in the Industrial Revolution 4.0. For information, the second step to be implemented after this is to carry out a study to establish a Johor State Creative Economy Plan. A comprehensive study on the background and potential of the Johor State Creative Economy will be published in the form of a State Creative Economy Action Plan, and up to today we have only relied on the National Creative Industry Policy formulated at the federal level. However, this National Creative Industry Policy does not contain clear information on the situation of the creative industry at state levels, including at the Johor state level.

Therefore, this National Creative Policy is a document of a national nature, and this policy looks at the creative industry at a macro level without placing emphasis on the dimension of community empowerment that is more local or regional in nature. Thus, it is the intention of the blueprint, with permission, that will be established, to develop a Creative Economy Action Plan that is more inclusive and has a dimension of local community empowerment such as youth, women, indigenous people and so on, which emphasises the identity of the Johor people, which is a cross-cutting identity for all Johoreans. So, this is to answer the question just now, and further, the state government's seriousness will also be reflected through the planned action plan, which will cover cultural and heritage, both tangible and intangible, with permission, and look at its potential in developing the local economy through creative tourism, commercialisation of products, branding of programmes and so on, within the context of the state of Johor.

At the same time, this action plan will ensure that a viable model of cooperation between the community, industry and the government can be established to ensure the sustainability of this action plan. In the absence of complete and up-to-date data and information on the creative industry in the state of Johor, efforts to conduct the study that I have mentioned earlier are very necessary before the state government plans and implements the agenda for creative economy development in the future. This action plan will contain complete information, God willing, on the existing ecosystem in the state of Johor, covering the number of creative industry players, both active and inactive, in full. It will also give a clear picture of the sectors that already exist, covering various fields. So basically, by establishing the Johor State Creative Economy Plan, this is the first step to demonstrate the state government's seriousness in developing the creative economy industry at the state level of Johor. Thank you.

SpeakerEN

Yes, Perling, please.

Tuan Cheo Yee HowDAP · PHPerlingEN

Thank you to the Honourable EXCO Member for the answer, and congratulations also to the state government for being able to establish this new portfolio, especially for local people in the state of Johor. So, my question is this: will the Johor state government take into account the involvement of external agencies in helping to develop this industry? That is all, thank you.

SpeakerEN

The Honourable EXCO Member, please.

Tuan Sheikh ‘Umar Bagharib bin AliDAP · PHChairman of the Committee on Information, Entrepreneur Development, Cooperatives and Creative Economy · PalohEN

Thank you, the Honourable Speaker, and thank you to the Honourable Perling for the supplementary question. As for the matter raised, at the basic policy level for the Johor state government, particularly in the development of the creative economy at state level, the government sees that even the first step of establishing the Johor State Creative Economy Plan takes time and a high level of commitment. Therefore, there are several ways to bypass this so that the state government can move faster in developing the creative economy of the state of Johor, namely by taking into account existing government and private agencies that are already documenting, studying and researching the creative economy of the state of Johor. If I may mention in this House, among the agencies or experts who have already developed studies or produced a blueprint related to the creative economy at the federal level are Think City, which has done many studies, and Think City is also the anchor, with permission, for the development of George Town in Penang, up until George Town was recognised for its heritage aspect by UNISCO. So, Think City is one of the agencies we will approach to jointly develop the Johor State Creative Economy Plan, and in fact, in the last one or two months, the state government has already engaged, with permission, with Think City.

Secondly, among them is the Cultural Economy Development Agency, or its abbreviation CENDANA. We have made an official visit to CENDANA's office, and CENDANA has also come to the state of Johor to see what matters can be shared and what help can be given to develop the creative economy of the state of Johor. In addition, whether we realise it or not, the National Film Development Corporation (FINAS) and also the National Art Gallery are among the entities involved in the development of the creative industry at the national level. So, with the existence of the agencies I have just mentioned, it is hoped that they can answer the Honourable Perling's question on whether the state government will engage, with permission, with external agencies to develop the creative economy of the state of Johor. So, of course the answer is yes, as I have just mentioned. Thank you.

SpeakerEN

The next question, the Honourable Mahkota, please.

Tuan Muhamad Said bin JonitAMANAH · PHMahkotaEN

The Honourable Mr Speaker, Question Number 4.

What are the state government's plans to overcome the problem of neglected and unused waqf land?

SpeakerEN

The Honourable EXCO Member, please.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Assalammualaikum warahmatullahi wabarakatuh, salam sejahtera, salam harapan. Thank you to Mr Speaker. In answer to the question from the Honourable Mahkota, the development of waqf land is subject to the argument or purpose of a particular waqf. Most waqfs are in the form of specific waqf such as mosque sites, suraus, cemeteries, or religious schools. If a site is still vacant, this does not mean it is not being developed, but it is still awaiting a suitable time or still does not have allocation for development through construction as stated in the intention or argument of the waqf in question.

The Johor Islamic Religious Council (Majlis Agama Islam Johor), through the approval of a fatwa, may permit the use of specific waqf sites for temporary development, such as temporary crops and livestock, if they are still not being used. For general waqf sites with potential, the Johor Islamic Religious Council will develop them with economic projects as appropriate. Thank you.

SpeakerEN

The Honourable Mahkota, supplementary question, please.

Tuan Muhamad Said bin JonitAMANAH · PHMahkotaEN

Now we have many problems regarding the housing issue among the B40 group. Can we use the neglected and unused waqf land to develop housing for this B40 group?

SpeakerEN

The Honourable EXCO Member, please.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

For the information of this honourable House, and in answer to the supplementary question from the Honourable Mahkota. Johor State still has no waqf land development specifically built for B40 affordable housing. The state government needs to refine several matters, and the issue most often raised is the ownership of waqf land title by house buyers. There are several methods to make this ownership work, among them, first, Isti'bal, namely replacing the waqf land to be used with other land of equal value or in the form of current valuation. The second method is ownership granted on a leasehold basis to buyers, not permanent ownership status. If housing development is built in multiple storeys and buyers are given only strata title, this still does not undermine the waqf status of the land concerned, so as to ensure that the waqf status remains intact.

If the state government wishes to make a new policy relating to specific development for B40, for waqf land to build houses, then the State Fatwa Committee, through the Mufti and the Johor Islamic Religious Council, must sit to make a decision. If the consent and approval of His Royal Highness Sultan Ibrahim ibni Almarhum Sultan Iskandar is obtained, then the Johor state government has no objection to implementing the recommendations and proposals of the Honourable Mahkota. That is all, thank you.

SpeakerEN

Next question, I invite Kemelah.

Tuan Dr. Sulaiman bin Mohd. NorAMANAH · PHKemelahEN

Honourable Member, Mr Speaker, question number 5.

What intensive efforts will be implemented to ensure that the northern area of Johor becomes a major cattle farming area in this region?

SpeakerEN

Invitation to the Honourable EXCO member.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Thank you, Mr Speaker, bismillahirrahmanirrahim. The Johor State Veterinary Services Department has drafted a holistic and intensive strategy to develop the cattle farming industry in Johor State. This plan aims to increase the current cattle population of 92,000 head in 2018 to 100,203 head in 2025, an increase of 10%. The northern area of Johor refers to the districts of Muar, Tangkak and Segamat, these three districts contribute 31,450 head of cattle, that is 34% compared with the overall population of Johor State. Integrated cattle farming will also be enhanced, where it contributes 60% of cattle production in Johor State. The Department has taken several measures and intensive efforts to develop cattle in the northern area of Johor through the following methods.

Segamat district has been focused as an agricultural development hub covering emphasis on agriculture, animal husbandry and fisheries. This means that every year there will be a special budget to develop the cattle farming industry. The Department has identified industrial plantation areas on an integrated basis by encouraging and intensifying the participation of the private sector in making the cattle farming industry of Johor State a success.

The Department has developed an Agro Vet centre to create a marketing chain of collection centres, auctions and sales of livestock between farmers and wholesalers. Enhancing feedlot cattle farming with federal cooperation, using satellite farm sheds intensively with full occupancy of 17 cattle sheds. The satellite farms in Muar and Segamat districts will increase the number of cattle farming in Johor State, where the capacity of one shed is 600 head per year. Therefore, full use of the satellite farms will produce 10,200 head per year.

The Department endeavours to improve skills in effectively delivering technology through more organised and systematic veterinary extension. This is evidenced by the Johor Veterinary Services Department becoming the overall champion of the national veterinary extension programme. This success will be applied to develop the minds of operators towards competitive and viable farming. That is all, thank you.

Speaker

Kemelah, dijemput.

Tuan Dr. Sulaiman bin Mohd. NorAMANAH · PHKemelahEN

Thank you, Mr Speaker, and thank you to the Honourable EXCO member who has answered. My supplementary question, as we know, in Labis there is the NFC Satellite Cattle Farm which has been left idle for a long time. So I would like to know what the status of the NFC Satellite Cattle Farm is, and what the state government's plans are, if any, for the centre. Thank you.

SpeakerEN

Invitation to the Honourable EXCO member.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Thank you, Mr Speaker. NFC is no longer in use. We are using the Johor State Satellite Farm. Okay, for everyone's information, in Johor there are 21 satellite farms and the federal central government will, in stages, fill all 21 satellite farms in Johor State. For Segamat district, there are 5 satellite farms at TKPM Kota Temalik and 3 satellite farms at TKPM Bangas, in

which the veterinary side has selected several companies or private firms to fill the vacancies at these satellite farms. There are already 5 operators who have filled part of the satellite farms in Segamat, where the identified operators are each given 20 acres to set up a shed, office, water pump, so they get 20 acres, then the remaining 18 acres are planted with grass, all of which is funded by the federal government. That is all, thank you.

SpeakerEN

Honourable Machap, please.

Thank you to the Honourable Mr Speaker. I would like to ask the EXCO for an explanation on how far the implementation of the assistance system given to farmers who wish to apply, or who have already applied, for assistance in rearing goats has succeeded. Because some time ago it was informed that there was assistance from the veterinary side of 15 Goa goats given.

SpeakerEN

This is cattle, Honourable Member. The cattle matter.

Goats not allowed?

SpeakerEN

Goats are not included, cattle.

And... cattle, how far its success has been, if goats are not allowed. (Laughter) The success of cattle assistance to farmers. Thank you.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Thank you. The veterinary side constantly monitors from time to time whatever assistance we provide. And usually the successful operators will meet with the veterinary officers again. So the veterinary side has a special team whose purpose is to monitor the operators. So the specific data on how many have succeeded and how many have not, I do not have that, I will reply in writing, but the Veterinary Department will always monitor and ensure that every assistance, every assistance given achieves its target, that's right. That is all, thank you.

SpeakerEN

Honourable Buluh Kasap.

Senator Dato’ Zahari bin SaripUMNO · BNBuloh KasapEN

Thank you, Mr Speaker. Thank you to the Honourable EXCO member for the explanation of the answer just now, and I would like to express thanks for the efforts of the state government in making the northern region of Johor one of the major cattle farming areas in this region. And the EXCO's answer just now mentioned the involvement of the private sector in developing this effort. So my supplementary question is, does it also provide opportunities for individual cattle operators, and if so, what are the specific conditions for these individual operators? Because when they want to make the northern region of Johor this large cattle farming area in this region, surely many parties will be involved. So what are the conditions for individual operators? Thank you.

SpeakerEN

Invitation to the Honourable EXCO member.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

The Veterinary Department always undertakes, always encourages anyone, whether individuals, cooperatives, directors, whatever, individuals, cooperatives or companies, to cultivate all these KPM lands. What the conditions are, I think you may refer to the Veterinary Department, God willing the Veterinary Department will try to help with whatever problems you gentlemen may face. That is all, thank you.

SpeakerEN

Next question, Honourable Perling.

Tuan Cheo Yee HowDAP · PHPerlingEN

Thank you, Mr Speaker. My question is question number 6.

State the statistics on the arrival of tourists to Johor State by domestic and international breakdown, country of origin, districts visited, and purpose of visit from 2008-2018.

SpeakerEN

Invitation to the Honourable EXCO member.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Honourable Mr Speaker, thank you to ADUN Perling. Johor State's very strategic location, namely being situated at the southernmost part of peninsular Malaysia, and bordering the state of Singapore, has made this state one of the main entry points for international visitors or tourists into Malaysia. Statistics on the total arrival of international visitors or tourists by 10 major countries for the years 2010 to 2018 obtained from the Johor State Immigration Department are as in Appendix A. Meanwhile, the total number of domestic and international tourists who stayed overnight in Johor State based on data obtained from Tourism Malaysia, through a hotel survey, with permission, from January to June 2018 is as follows. For January to June 2018, the total number of tourists who stayed overnight in Johor State was 3,414,321 persons. Due to the lengthy statistics, the statistics for the years 2008 to 2017 I will give to ADUN Perling in writing. Based on observations made, the 5 main districts most frequently visited by domestic and international tourists in Johor State are as follows. First, Johor Bahru district, second Kota Tinggi district, third Mersing district, then Pontian district and Muar district. The state government, through Tourism Johor, found that among the purposes of arrival of domestic and international tourists to Johor State are holidays or rest, shopping and entertainment, food, seeking medical treatment, attending meetings, seminars or events, and then visiting friends and relatives.

Honourable Mr Speaker, the statistics on the total arrival of visitors and international tourists to Johor State through 14 entry points are as follows. For the year 2018, the total number of visitors or international tourists who entered Johor State was 7,523,580 persons, and among them Singapore recorded the highest total arrivals of visitors and tourists, namely 5,601,944 persons. Next came Indonesia with 690,998 persons.

SpeakerEN

After that, do they go back, Honourable Member? After they go sightseeing, do they go back to their state, or do they stay here permanently?

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Some come and stay overnight. Thank you.

SpeakerEN

Okay, Larkin, please.

Tuan Mohd. Izhar bin AhmadBERSATU · PHLarkinEN

Thank you, Honourable Mr Speaker. We are well aware that the tourism sector is one of the sectors that drives the state's economy. Apart from that, there ought to be controls over tourists who commit crimes, who are involved in crime in the state, where we find that several arrests have occurred. So I would like to know, what are the statistics on crime rates involving international tourists. Thank you.

SpeakerEN

Invitation to the Honourable EXCO member.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Honourable Mr Speaker. My view is that this question has strayed from what I am able to provide, because this crime involves the Royal Malaysia Police (PDRM). I cannot answer this question, but I will request PDRM to give me the statistics and then give them to ADUN Larkin. Thank you.

SpeakerEN

Okay, Perling, please.

Tuan Cheo Yee HowDAP · PHPerlingEN

Okay, since Mr Speaker also asked about staying overnight, we want to know what efforts the state government is making to obtain statistics on overnight tourists by districts in Johor State. This is my supplementary question.

SpeakerEN

Invitation to the Honourable EXCO member.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Honourable Mr Speaker, it is indeed true that it is important for us to obtain statistics on overnight tourists in Johor State. For the information of this honourable House, throughout Malaysia there is a policy gap, namely that in each state we do not have statistics by district, under the existing policy. However, the Johor state government, through the recently held meeting of the Johor State Tourism Action Council, has already held discussions with the local authorities (PBT) regarding this matter. Tourism Johor will establish cooperation with the local authorities and also with Tourism Malaysia to obtain statistics on overnight tourists by district from hotels and in their respective districts.

For the information of this honourable House, my side was informed by MBJB that MBJB has taken the initiative in which they are studying how to obtain statistics from hotels or motels in the future. At the same time, the state government will also continue its efforts to hold discussions with all industry players through dialogue, meetings or meetings of the Johor State Tourism Action Council, and subsequently to obtain views on the issue in a more holistic manner. The state government recognises the importance of statistics on tourist arrivals in Johor State by district so that we can identify the potential and competitiveness of each district as a tourism destination. That is all, thank you.

Speaker

Jementah.

Tuan Tan Chen ChoonDAP · PHJementahEN

Thank you, Honourable Mr Speaker, thank you Honourable EXCO member. Jementah welcomes the state government's efforts in establishing the Johor State Tourism Action Council. This is a good step to further enhance the government's efforts to advance the tourism sector. My question is whether this Tourism Action Council will be established in every district or divided into zones? For example, northern zone one, we have one office, central zone we have one, and southern zone we have one, so that the coordination work to develop our tourism sector will be even better in this effort, and I humbly request some clarification.

SpeakerEN

Invitation to the Honourable EXCO member.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you, ADUN Jementah. For the information of ADUN Jementah, the Johor State Tourism Action Council involves all local authorities (PBT) and District Offices in Johor State. So, the officers and directors all involved, and they will hold, we will hold meetings from time to time. Besides that, I have also received feedback, if I may say so, that there is a shortage of coordinators in every district. Therefore we have also discussed within the Johor State Tourism Action Council that in the future, we will study whether existing staff can be placed, one officer or coordinator in every district. That is all, thank you.

SpeakerEN

Next question, Honourable Tanjung Surat, please.

Honourable Mr Speaker, my question is question number 7.

When will the works to upgrade the Senai – Desaru Highway from 2 lanes to 4 lanes, from the Cahaya Baru Junction to the Bandar Penawar Junction, be carried out?

SpeakerEN

Invitation to the Honourable EXCO member.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Assalamualaikum warahmatullahi taala wabarakatuh, greetings of wellbeing, greetings of hope. Bismillahirahmanirahim, Honourable Mr Speaker, actually this highway is under the responsibility of the federal government and we at state level assist in terms of monitoring, with permission. Before that, according to information I received, the previous federal government, in December 2017, the Minister of Works at that time announced that the government had approved an allocation of RM380 million for the works to upgrade and widen the Senai – Desaru Highway from 2 lanes to 4 lanes, involving a distance of 26 kilometres starting from the Cahaya Baru junction to the Bandar Penawar junction.

However, a review was carried out by the Ministry of Finance together with the Ministry of Works in July 2018 to identify the list of Ministry of Works projects for which letters of acceptance had not yet been issued, and to conduct a study for savings. As a result of that session, the project to upgrade and widen the Senai – Desaru Highway was postponed. Thank you.

SpeakerEN

Tanjung Surat, please, supplementary question.

Honourable Mr Speaker, I would like to ask, because this road has a concession holder, so if the federal government bears the expenditure to build this road from 2 to upgrade from 2 lanes to 4 lanes, the one who collects the tolls later will be the concessionaire, so how is that, will the federal government simply bear the cost or will it claim from the concessionaire? That is all.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Thank you. According to the initial agreement between E22 Senai – Desaru and the federal government, there are its conditions, its conditions mature in 2031, so in 2031 the company must be directed to do it, or when the frequency of vehicles passing reaches 30,000 a day, and the current situation is roughly over 14,000. So according to that agreement, indeed, it is not. However, we know that the project involves supporting the development of the Integrated Petroleum Complex, PIPC, so we also took the initiative with the new government, and I myself have already met the Minister of Works 2 months ago in Kuala Lumpur, where we intend to hope that this project is given priority. But even so, as far as the list released next year, it is not in the priority list. Thank you.

Speaker

Tangkak.

Tuan Ee Chin LiDAP · PHTangkakEN

Thank you, Honourable Mr Speaker. Thank you for the answer from the Honourable EXCO member. Mr Speaker, Tangkak would like to ask, if there are records, Honourable EXCO member, what was the reason that when the Senai – Desaru Highway was opened in 2011, 7 years ago, what was the actual reason that happened, there are only two lanes in the middle of this highway and we can see along this highway there are indeed many bridges including what I think is the longest bridge, crossing the Sungai Johor. And I would like to ask, is it due to a shortage of finances at that time or were there other reasons? Thank you.

SpeakerEN

Honourable EXCO member, please. Is there a 2-lane highway like this anywhere in the world?

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

The Honourable Member, this project is a privatisation project. When it is privatised, of course the company takes into account profit and loss. Previously, the main target was actually our industrial area in Pasir Gudang. So if we go by the frequency, the calculation is for it to be able to help that company. So when there is a new plan, and I also cannot say anything about this, I will give the details, because I do not hold the agreement, and I will look for more accurate information and give it to you in writing. Thank you.

SpeakerEN

Are there other places with this 2-lane road, this highway, Honourable Member? Apart from our state?

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

This is a very old matter. (The House laughs).

SpeakerEN

Next question. Honourable Member for Kahang, please.

Question No. 8.

Inclusive development in Johor should not marginalise any target group. Does the state government today focus on the economic, living standard and education development of the Orang Asli, and what steps have been taken to ensure this?

SpeakerEN

Please, Honourable EXCO Member.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Thank you, Mr Speaker, and thank you to the Honourable Member for Kahang for the question raised on the economic development, living standards and education of the Orang Asli community. For the information of the august House, the total number of Orang Asli villages in the state of Johor is 60 villages, involving 3,508 families with a total population of 14,619

persons. The ethnic breakdown of the Orang Asli community in the state of Johor involves the Jakun, Kuala, Seletar, Kanak, Temuan and other ethnic groups.

They also adhere to various religions, namely Islam, Animism, Christianity and Buddhism. Among the basic facilities that already exist in Orang Asli villages are Tabika, TNB electricity supply, water supply, SAJ water supply, transit health treatment centre, the Johor Islamic Religious Department's rumah penggerak, religious schools, fishermen's jetties, tarred roads inside the village and also tarred roads leading to the village, PPRT houses, surau and also village halls.

The development allocation for Orang Asli villages in Johor in 2018 is RM1.755 million, covering infrastructure programmes, economic programmes, entrepreneur programmes, new and renovated PPRT construction, and income enhancement programmes. This allocation is from the Department of Orang Asli Development, in short JKOA, which is now transferred from the Ministry of Rural Development to the Prime Minister's Department, and also an allocation from the Ministry of Rural Development.

For the information of the August House, the existing assistance from the government through the Department of Orang Asli Development (JKOA) and other agencies is as follows. First, education assistance under the education incentive assistance scheme. Second, free transport to and from school. Third, pocket allowance for secondary school students of RM2.00 per day based on attendance. Scholarship assistance for Orang Asli students pursuing studies at IPTA, entrepreneur guidance assistance for eligible persons, the career skills training programme, in short PLKK, free courses and training as well as employment opportunities after completing the course, fishermen's livelihood assistance, JKM livelihood assistance, the Department of Social Welfare, employment opportunities for Orang Asli youth at the Port of Tanjung Pelepas, and free treatment assistance at government hospitals and clinics.

For information, the Johor state government has channelled allocations to the Orang Asli community as follows. In 2015, RM100,000.00; in 2016, RM100,000.00; in 2017, RM150,000.00. For 2015, 2016 and 2017, among the activities and programmes implemented were programmes for the Orang Asli community together with government agencies and departments. Community Education Programmes for Orang Asli, involving Orang Asli students, youth and children, study visits for Tok-Tok Batin and the Orang Asli Village Community Management Consultative Council to Sarawak, and community and friendly programmes with the Orang Asli community at all district levels in the state of Johor together with the Johor state government.

Among the joint programmes between Orang Asli villages and the state government in 2018 are, first, the Rakyat Economic Project, in short ERA, through the Darul Ta'zim Family Development Foundation, YPK. Second, the Chilli Fertigation Project involving Orang Asli villages, involving Kampung Dalam Parit Sulung in Batu Pahat. Third, the Lembah Kelulut Project involving Orang Asli Village Puting in Segamat, Orang Asli Village Sayong Pinang in Kota Tinggi, Orang Asli Village Searak Api in Muar and Orang Asli Village Pengkalan Tereh in Kluang.

For information, these projects are able to improve the living standards and income of the Orang Asli community. In addition, the Department of Orang Asli Development (JKOA) also takes into account the needs and living standards of the Orang Asli community. This year, JKOA has also allocated RM130,000.00 under the entrepreneur guidance programme through assistance in providing business equipment, provision of business premises or buildings, and business strategies. Through the Ministry of Rural Development, Orang Asli entrepreneurs will attend courses such as cooperative management, village homestay programme courses, and tourism economics throughout 2018.

For information also, in the field of education, JKOA has organised excellence education programmes for Orang Asli students sitting for the UPSR, PT3, SPM examinations, as well as the Tuisyen Rakyat, involving an allocation of RM90,000.00. That is all, Mr Speaker.

Speaker

Jemput Kahang.

Mr Speaker, supplementary question. Thank you to the Honourable EXCO Member for a question that I feel is indeed complete. If we look, the Honourable EXCO Member mentioned JKOA. JKOA is the agency that looks after the affairs of the Orang Asli community, established by the federal government. And as was stated earlier, in Johor there are 60 Orang Asli villages. So specifically, if we look at it, I would like to know what efforts the state government has made to ensure that the programmes carried out at the state government level reach all 60 Orang Asli villages. I believe that at the state government level, we do not have a single agency that looks after the affairs of the Orang Asli community, and we rely on JKOA, which, as we often learn, is short of staff, officers and so on.

And the impact of JKOA programmes at the federal level is sometimes rarely felt in Orang Asli villages. So I hope the state government will focus on ensuring that programmes carried out at the state level must have their own approach, because programmes formulated for the Orang Asli cannot be the same as those for other races.

SpeakerEN

Question from the Honourable Member, the question.

So I want to know what efforts, whether the state government intends to establish a special unit for the Orang Asli community, so that state government programmes for the Orang Asli will reach them directly without relying solely on JKOA to play that role.

SpeakerEN

Ok, please, Honourable EXCO Member.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Thank you to the Honourable Member for Kahang for the supplementary question. As we already know, JKOA is under the federal government, a federal agency, and most of the allocations come from JKOA or the Ministry of Rural Development. What we do at the state government level is cooperate with the agencies of the Ministry of Rural Development and also JKOA to coordinate, particularly on infrastructure development and basic facilities, which largely fall within the powers of the state government. In terms of allocations, I admit that most of the allocations come from the Ministry of Rural Development and JKOA, that is, from the federal government.

I am not sure why, in the past, departmental allocations or Orang Asli community allocations did not reach the village, I am not sure why, but under the Pakatan Harapan government, God willing, we will ensure that every allocation specifically for Orang Asli community development, whether from federal agencies or from our state government, reaches the village concerned, as we have endeavoured to do at state government level, for example the development of the Orang Asli village at Sedohok, which for a long time had no water supply. Alhamdulillah, we have negotiated with the Ministry of Rural Development, and they have approved the allocation, and God willing, the work to supply clean water to Kampung Sedohok in Kluang will be carried out in the near future. The proposal to establish a special unit for Orang Asli development at the state level of Johor is a good proposal, and God willing, if approved at the state government level, I will invite the Honourable Member for Kahang to take part.

SpeakerEN

Next question, Honourable Member for Semarang, please.

Assalamualaikum warahmatullahi taala wabarakatuh, Mr Speaker. My question is Question No. 9.

What is the performance and total collection and expenditure of zakat in the state of Johor to date, and its projection until the end of 2018?

SpeakerEN

Please, Honourable EXCO Member.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Assalamualaikum warahmatullahi taala wabarakatuh and greetings of hope. Thank you, Mr Speaker. To answer the question raised by Semarang, the Johor State Islamic Religious Council (MAIJ) targets zakat collection of RM270 million for 2018. The zakat collection achievement up to 31 October 2018 is RM214,734,952.21, covering zakat harta of RM199,671,015.21, while zakat fitrah is RM15,063,937.00. That is all, thank you.

SpeakerEN

Honourable Member, do all of us Honourable Members pay zakat? Please.

Thank you, Honourable Mr Speaker. My supplementary question: up to now, there is seen to be a decline in collections from the RM270 million estimated until the end of this year, because right now it is only RM214 million; hopefully it will reach RM270 million. My supplementary question is, what is the projected utilisation as in my question, and also each year what percentage of the total collection is used, and what programmes or reforms are there to increase the smoothness and efficiency of the process of providing assistance by the Islamic Religious Council. Thank you.

SpeakerEN

Please, Honourable EXCO Member.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Thank you to Semarang. The expenditure made based on what has been distributed is: fakir, RM35,892,307.50; miskin, RM71,814,087.56; amil, RM20,636,122.00; mualaf, RM14,123,159.00; gharim, RM1,395,890.00; ibnu sabil, RM452,553.00; fisabilillah, RM52,006,865.00; where the total amount spent or distributed up to 31 October 2018 is RM196,320,987.00. Among these distributions, apart from the details, including how some of it is given, are monthly living allowance assistance, namely 15,561 asnaf fakir and miskin across the whole state of Johor receive assistance estimated at RM65 million a year. Medical assistance, under the kidney treatment assistance scheme, 4,143 persons, namely kidney patients, receive haemodialysis treatment assistance with expenditure of RM51 million a year. Also, assistance for various other treatments amounting to RM19 million is spent on more than 3,000 patients covered by zakat funds each year. Thank you.

SpeakerEN

Pulai Sebatang, please.

Tuan Muhammad Taqiuddin bin ChemanAMANAH · PHPulai SebatangEN

Thank you, Honourable Mr Speaker. My supplementary question: within the breakdown of the total zakat collection of the Johor Islamic Religious Council (MAIJ), can I obtain how much allocation MAIJ spends on the education of these asnaf children? That is all.

SpeakerEN

Please, Honourable EXCO Member.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Thank you to Pulai Sebatang. The Islamic Religious Council also does not neglect the education of asnaf children, as we are well aware, these children need assistance from many parties. So, the Islamic Religious Council takes on the main responsibility to ensure that these children receive education and also completeness in terms of going to school, whether clothing and school fees. Where allocations have been made of RM17.2 million a year for education assistance, covering RM1.2 million for school fees, RM5 million for uniform clothing assistance, RM3 million for IPT registration assistance, Institutions of Higher Learning, donations for students studying overseas RM2 million, education loans for medical students in the Middle East in particular, namely RM5.7 million, and general education contributions of RM300,000.00. All of these implemented are from zakat fund allocations, and such programmes would not be achievable if the collection target is far below. So, hopefully with the presentation this morning, our Muslim community will compete to pay zakat at the Johor State Islamic Religious Council.

SpeakerEN

Yes, Sedili, please.

My supplementary question, Mr Speaker. I understand that earlier the EXCO side said zakat revenue collection is about RM200 million plus a year and expenditure about RM100 million plus. I would like to ask, how much is the surplus of zakat collection gathered each year until the end of this year? Thank you.

SpeakerEN

Please, Honourable EXCO Member.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

For the information of the August House, the question from Sedili is that zakat collection and expenditure have actually never been sufficient to be spent. The state government helps a little with administrative management or with the related expenditure. Thank you.

SpeakerEN

Next question, please, Honourable Member for Senai.

Tuan Tee Boon TsongDAP · PHSenaiEN

Thank you, Mr Speaker. My question is Question No. 10.

What is the plan of the local authorities (PBT) to solve the problem of foreign worker hostels?

SpeakerEN

Please, Honourable EXCO Member.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, Honourable Mr Speaker, for giving me a second opportunity to answer today. And thank you to the ADUN for Senai for the question raised. Honourable Mr Speaker, the guidelines and standards for foreign worker planning have been prepared by PLAN Malaysia Johor and were considered for adoption on 21 July 2008 by the State Planning Committee, Number 1/2008. The adoption of these guidelines is to create uniform guidelines for the permanent, centralised and planned settlement of foreign workers in all local authority areas within Iskandar Malaysia. These guidelines serve as a guide to the State Authority, local authorities, the Iskandar Malaysia Authority, relevant government agencies, developers and management in planning and implementing the development of foreign worker settlements. The foreign worker settlements permitted under the guidelines are hostels or dormitories and apartments, with site ownership criteria not allowed in residential areas. In addition, the permitted density for a foreign worker settlement must not exceed 5,000 foreign workers.

Honourable Mr Speaker, the shortage of foreign worker hostels must be tackled jointly by all relevant parties so as not to cause disturbance to the community and give a negative image to our country. At the PBT level, the provision of sufficient foreign worker hostels is one of the main agendas to be implemented to safeguard the welfare and safety of foreign workers. To support this commitment, taking as an example, the Johor Bahru City Council (MBJB) has prepared the Special Area Plan, RKK Industrial MBJB, which takes into account 38 industrial areas under the administration of MBJB with an area of approximately 10,730 acres. In this RKK study, locations for the construction of foreign worker hostels have been proposed in large-scale industrial areas such as Tebrau 4 Industrial Area, Desa Cemerlang, Tampoi, Maju Jaya and Plentong. Based on the latest statistics, there are 6 foreign worker hostels that have been operating and 3 more have been approved and will be developed in the near future.

In addition, the Council also requires, in the planning permission, KM, that developers provide foreign worker hostels for the development of new industrial areas exceeding 20 acres. Next, for older industrial areas that are already operating, the private sector is encouraged to build foreign worker hostels centrally for rent to factory operators who have foreign workers. That is all, thank you.

SpeakerEN

Yes, Senai. Please, Mengkibol.

Tuan Chew Chong SinDAP · PHMengkibolEN

Thank you, Mr Speaker, thank you, Honourable EXCO Member. May I add, my supplementary question: what steps are being taken by the government or PBT to reduce the burden on plantation operators, given the current weak economic conditions and the falling prices of palm oil and rubber. For example, if a plantation has 35 foreign workers, and if they build a hostel according to one hostel model, it will cost RM750,000.00. This means for each foreign worker, the cost of the hostel is approximately RM21,000.00. What steps, or as in the example, in the foreign worker accommodation checklist, the first item is CF from the PBT, is it possible for PBT to relax the conditions to reduce the burden on these operators? Thank you.

Speaker

Jemput EXCO.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Thank you, Honourable Member, Mr Speaker, and Honourable Mengkibol for raising this issue. In fact, I see that the background to this issue that has been raised relates to issues where many foreign workers working in the industrial sector have created a problem, a problem in urban areas as part of the urbanisation process, where the existence of communities or settlements of these foreign workers in housing estates has caused concern or unease in the local community. Therefore, I see that the question raised by the Honourable Mengkibol is somewhat not in line with today's discussion. Whereby, the issue raised concerns foreign nationals or foreign workers on farms, involving mostly a not very large number, if we look at it, compared with the foreign nationals involved in the industrial sector. This is the first point. Secondly, most foreign nationals working on these farms live on the farms and do not cause too great a problem in the local community. Therefore, I see that the question arising is somewhat off track from what is being discussed today. However, the proposal from the Honourable Mengkibol regarding relaxation of the CCC requirement: because the requirement cannot be relaxed, the requirement must be tightened, as it is set for the common interest and the safety of its occupants. If it is said to reduce the burden, then the fees charged should be the thing that can be considered, but the stipulated requirements must be followed.

Speaker

Larkin.

Tuan Mohd. Izhar bin AhmadBERSATU · PHLarkinEN

Thank you, Mr Speaker. The question raised here is what plans the Local Authorities (PBT) have to solve the problem of hostels for foreign workers, foreign nationals? So the earlier question raised by Mengkibol is quite relevant. Another point, my question: every foreign nationals' hostel that is to be built must have a guideline set by the Local Authorities (PBT) as to how far from residential areas and how far the hostel must be built from industrial areas. So I want to know how far, the parameters that have been set. Thank you.

SpeakerEN

I invite YB EXCO.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Mr Speaker, regarding the question raised by Larkin, I think what is more important in today's discussion is how we ensure that the existence of these foreign communities does not cause unease in the local community. Therefore, the question of distance actually does not have too high an impact; what is important is how we control the activities of these foreign workers so that this does not cause social problems in the local community, and it is actually for the PBT. We are only in the planning process; we can impose a condition setting that there must be a hostel, and there must be a place of accommodation for these foreign nationals so that they do not need to mix or go to housing estates to rent houses and turn them into hostels. That is the spirit behind this policy. So I think this matter can be taken into account.

SpeakerEN

Next question, Honourable Mengkibol.

Tuan Chew Chong SinDAP · PHMengkibolEN

Mr Speaker, question number 11.

Singapore, as the neighbouring country closest to Johor, has attracted 17 million visitors in 2017. Please state the measures to encourage these visitors also to visit the state of Johor.

SpeakerEN

I invite YB EXCO.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Mr Speaker, Honourable ADUN Mengkibol, the statistics on the number of international visitors or tourists entering through entry points of the state of Johor for the period January to June 2018, obtained from the Johor State Immigration Department, recorded an increase of 7.3%, namely 7.5 million people compared with 7 million people in 2017. Of that total, visitors or tourists from Singapore recorded the highest arrivals at 5.6 million people by country, Indonesia 690,000 and China 386,000 people. Therefore, the state government, through various agencies, is continuously stepping up efforts to attract international visitors or tourists, especially Singapore citizens who use the state of Johor's entry points to enter Malaysia, so that they come to stay overnight and spend money in this state. Among the measures taken by the state government are as follows. First, intensifying the promotion and marketing campaign for Johor tourism through participation in tourism exhibitions held in Singapore.

For information, this year the state government has participated in the Malaysia Truly Asia tourism exhibition from 24 to 26 August 2018, Travel Malaysia from 19 to 21 October 2018 and ITB Asia from 17 to 19 October 2018. Next, increasing the organisation of tourism events that can attract Singapore citizens to come or participate in such events, such as the World Kite Festival, Pasir Gudang, 113 across Malaysia, Triton Iskandar Puteri Challenge and so on. Third, organising familiarisation trips or famtrips, with permission, for tourism agencies and media in Singapore.

This year, the state government has organised a familiarisation visit or famtrip, with permission, for tourism agencies and media in Singapore, namely on 23 April 2018. Through this programme, participants were given exposure and taken to visit tourist attractions around the city of Johor Bahru. And then diversifying Johor's tourism products, where, as we are well aware, several tourism-related development projects are currently being developed in the state of Johor, such as the Desaru Coast development project. The state government, through Tourism Johor, will collaborate with Tourism Malaysia in Singapore to intensify the advertising and promotion campaign for Johor tourism, especially in Singapore's mass media, and then develop creative and attractive Johor tourism packages to be marketed in Singapore. That concludes my reply. Thank you.

SpeakerEN

Yes, Mengkibol, supplementary question.

Tuan Chew Chong SinDAP · PHMengkibolEN

Thank you, Mr Speaker, and Honourable EXCO. Given the first statistic, 17 million visitors to Singapore, the Singapore government now feels worried because Singapore does not have sufficient capacity for visitors or tourists. The second statistic given by YB EXCO regarding foreign visitors to Johor state, it seems we still depend on visitors from Singapore at such a high percentage. So my supplementary question is, is it possible for the state government to apply for or implement transit visas, transit visas on arrival? That is, if 17 million visitors go to Singapore, if we give transit visas, they may be able to enter Johor through CIQ or Senai Airport; if we can attract 1% of these 17 million, according to my calculation Johor's GDP may be able to increase by 0.153%. If each visitor spends RM1,000 during their stopover in Johor. Thank you.

Speaker

Jemput EXCO.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Mr Speaker, for the supplementary question of the ADUN Mengkibol, firstly regarding tourists from outside the country, other than from Singapore, Tourism Johor is working on the existing direct flights, namely those from outside the country into Johor state via Senai Airport, and we will work on direct flights like these and further strengthen promotion in those countries. And then regarding visa on arrival, or this transit visa, this depends on the National Immigration Department (Jabatan Imigresen Negara) and also the federal government. However, I have already held discussions with the Ministry of Tourism, Arts and Culture (MOTAC) at the federal level, and discussions between Tourism Malaysia, MOTAC and also the National Immigration Department are still ongoing. That concludes my reply. Thank you.

Speaker

Sedili, jemput.

Honourable Speaker, my supplementary question. I am confident and I believe that with the 7.3% increase, with the 7.5 million tourists from Singapore coming to Malaysia, they come to Johor merely as a transit route. I am confident they go to Melaka, go to Kuala Lumpur, Genting Highlands. Johor is just a transit place. I think the Johor government, the Tourism EXCO, should do one thing, I give one suggestion: at least they must go to a check point. All tourists who want to come and go to Kuala Lumpur and so on must stop at one place; at that place at least we can also get money. This we only just name, every year 7.5 million, next year 8 million, we are just numbers.

SpeakerEN

Just passing through, that's all.

Just passing through. We have to find a way. For example, before going to Melaka, they must stop at Muar, where there is a check point. At that place they must spend money, or by whatever means, for the Johor government to increase its revenue. Thank you.

SpeakerEN

I invite YB EXCO.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Thank you, Honourable Mr Speaker. No, no, I also agree that some people think that.

SpeakerEN

What is that "no"? That "no"? (House laughs).

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

I also agree that when visitors or tourists from Singapore merely pass by Johor state, that is a perception that Tourism Johor and I are working on, where what we will do is ensure that within these five years Johor state can change this perception and turn it from a passed by state into a must visit state in Johor. Therefore, we have worked to identify tourist destinations in the 10 districts in the state of Johor. What I mentioned just now is among the efforts being discussed in the Johor State Tourism Action Council (Majlis Tindakan Pelancongan Negeri Johor). With this, we can identify whether tourists visit, and we can get statistics in each district when they stay at hotels and motels. Thank you.

SpeakerEN

The time is already 11 o'clock, so I think we end these questions here. If there are questions listed that have not been answered orally, they will be answered in writing in the same sitting. Since we want to finish early today, there will be no break. We continue straight on; if anyone has business to attend to outside, you may step out briefly and come back.

ClerkEN

Written questions: answers to written questions by Honourable Members have been tabled on the table of the meeting.

Continuation of debate on the second reading of the Appropriation (2019) Bill for the year 2018.Bill

SpeakerEN

Honourable Members, the debate on the motion for the second reading of the Enakmen Perbekalan (2019) Tahun 2018 continues now. I invite the Honourable Chairman of the Housing and Rural Development Committee.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Thank you, Mr Speaker. Bismillahirrahmanirrahim. (Prayer recitation) Mr Speaker, in conjunction with the celebration of the 60th birthday of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan and Yang Dipertuan of the State and Dependencies of Johor Darul Ta'zim, on 22 November 2018 just passed, I humbly offer my highest loyal respects and pray that His Royal Highness Tuanku be blessed with good health, and hopefully, with the blessings of His Royal Highness Tuanku's leadership, the state of Johor will continue to progress modernly and prosperously, and the people of Johor live in unity.

I also wish to record my thanks to the Most Honourable Dato' Osman Sapian, Menteri Besar of Johor, and Dato Azmi Rohani, State Secretary of Johor, for the conferment of the Johor Crown Order, the Most Exalted First Class, Dato' Seri Paduka Johor, from His Royal Highness the Sultan of Johor. I also congratulate the Most Honourable Dato' Menteri Besar for successfully tabling the 2019 Budget, with the theme "Menerajui Perubahan Menggalas Harapan Bangsa Johor Bestari". The budget is based on 6 strategic pillars covering 28 sectors and 207 focus points, comprehensive in nature and touching on all priority aspects, especially the well-being of the people, specifically in terms of reducing the cost of living of the people.

The sixth pillar of the budget outlines the establishment of efficient, integrity-based and democratic governance, which is the main foundation of government administration. The government we want to form is not only efficient in governance but also has integrity or trustworthiness; in other words, the government formed is free from corruption, abuse of power and also kleptocracy. That is why we limit the Menteri Besar post to only 2 terms, implement the asset declaration process, including the "Aku Janji" pledge to be free of corruption, with the Malaysian Anti-Corruption Commission (SPRM). Implement the process of open tendering to state governments, GLCs (with permission), government-linked companies and Local Authorities.

Mr Speaker, YB Benut as the opposition leader said that the 2019 Budget is 87% cut and paste, or a 3R budget (with permission: reclaim, repeat and rebranding). I would like to remind the Honourable Members over there that the reality is that the government taken over by Pakatan Harapan after PRU-14 is a government that has been running or in power for 61 years, since the nation attained independence. At the same time, the Pakatan Harapan government practises an open approach, especially in providing services to the people. In the Al-Quran, Surah Al-Baqarah, verse 148, the expression is mentioned (recitation of the Quran): "You should compete in doing good." Therefore, any good initiatives implemented by the previous government will be continued and even improved, whereas any initiatives that are not good for the people, involving a culture of corruption and abuse of power implemented by the previous government, will be abolished. This is a narrative that we need to understand.

The Hadith of the Messenger of Allah SAW, meaning: "Wisdom or matters of wisdom are the lost property of the believer; wherever he finds it, he is the one entitled to pick it up." Its meaning is that Islam does not prohibit its followers from adopting or adapting something good, even if it comes from non-Muslims. Sayidina Umar Al-Khattab, the Rightly Guided Caliph, carried out many reforms in the administrative system of his government, including introducing a system of specialised departments for particular duties and fields of authority, adapted from the administrative system implemented by the Persian government, which was a major political power at that time together with the Roman government.

So Honourable Members over there, do not feel worried, because every good deed we carry out will surely be rewarded with merit by Allah SWT.

Indang-indang padi di daik, padi bukit di tampi jua; kalau ada budi BN yang baik walaupun sedikit tetap dikenang jua.

Mr Speaker,

SpeakerEN

No clapping, eh? Praise that.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Allow me to cite a Malay expression as a vehicle for our shared reminder as leaders, especially concerning the proper character that should be possessed by those who are called leaders. Upholding syarak outwardly and inwardly, faith is firm, adat is also deep-rooted, piety is evident, knowledge is plentiful. Broad of chest, far-sighted, clear of face, eloquent of tongue. Firm in conviction, sound of reason, standing firm without wavering, speaking without shifting, brave in withstanding tests, loyal and steadfast when tried, obedient and enduring when bent, grounded in what is right, dwelling in what is good, provided for by what is lawful, speaking what is beneficial, advising what is useful.

SpeakerEN

Who is that, Honourable Member?

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Generally, Mr Speaker, the qualities that we as leaders should possess. Mr Speaker, I would like to touch on the development of Perumahan Mampu Biaya in the State of Johor. The Government needs to carry out an agenda to reform the housing sector to ensure that the target of building 100,000 units of Rumah Mampu Biaya can be achieved by 2023. I am aware that this target of building 100,000 units of Rumah Mampu Biaya is not an easy thing to achieve, but at the same time it is not impossible. At the very least, the government has the courage to set a target or goal, with permission, to be achieved, and after that we strive as hard as we can, or as well as we can, to achieve it.

Motivational experts often say, with permission, "goal is direction". The word of Allah SWT in Surah Al-Imran, verse 150, says (quotation from the Quran), "Resolve upon the best decision, then leave the rest to trusting in Allah SWT for the efforts we make." Among the reforms that need to be carried out are in the aspects of providing the supply of Rumah Mampu Biaya, the distribution system, ease of financing and reduction of construction costs. The existing Johor People's Housing Policy (Dasar Perumahan Rakyat Johor, DPRJ) will be redrafted. It was drafted in 2012 for the Iskandar Malaysia area and in 2014 for areas outside Iskandar Malaysia, and there are many weaknesses that could be manipulated by irresponsible housing developers. As evidence, up to now, as I have mentioned previously in this esteemed House, there were 134,195 units of houses previously

Rumah Mampu Milik, now known as Rumah Mampu Biaya, which were not built by housing developers.

The Honourable Member for Gambir raised the issue that among the challenges in building Rumah Mampu Biaya is government bureaucracy, which causes delays in the construction of Rumah Mampu Biaya. The Johor People's Housing Policy 2.0, which will be enforced early next year, will take this issue into account, both at the level of the Local Authorities and also at the level of the Johor State Secretary's Office, Housing Division (SUKJ). The functions and effectiveness of the one-stop agency, with permission, OCS, as a one-stop centre for approval of Planning Permission (Kebenaran Merancang, KM) at the level of the Local Authorities will be reviewed and improvement processes will be carried out.

The Honourable Member for Pemanis proposed that the government redefine the role of government-linked companies (GLCs) while empowering active private sector involvement in the concept of privatisation in building Rumah Mampu Biaya. As I have explained before, among the four strategies for providing sufficient supply of Rumah Mampu Biaya is the strategy of acquiring land, which is then developed by the state government's GLCs. The privatisation project strategy, meanwhile, will involve private housing developers in developing state-owned land.

Mr Speaker, the Honourable Member for Pulai Sebatang raised the matter of the funds of the Bumiputera Quota Contribution Fund (Tabung Sumbangan Kuota Bumiputera) used for a visit to London which involved expenditure exceeding RM800,000.00. For the information of the Honourable Member for Pulai Sebatang, the trip to London was a working visit combined with study to Manchester and London, England, also to observe and learn about green building technology, housing development policies and international zone housing management, from 25 April 2016 to 02 May 2016. This visit involved 17 persons, the majority of whom were state government officials. This eight-day working visit involved a cost of RM822,640.00.

The Honourable Member for Pulai Sebatang also proposed that the state government impose a condition that Rumah Mampu Biaya may not be rented out. For the information of the Honourable Member for Pulai Sebatang, under the current policy, the condition that houses may not be rented out is only imposed on houses under the People's Housing Project (Projek Perumahan Rakyat, PPR) or, in short, PPR, which are rented out at a rate of RM124.00 a month, and Government Rental Housing (Rumah Sewa Kerajaan), in short RSK, which are rented out at a rate of RM65.00 to RM150.00 a month, depending on location and number of bedrooms. The rationale for not imposing the condition that Rumah Mampu Biaya may not be rented out is that there are sometimes cases where owners cannot live in the house because of a transfer of workplace due to various reasons.

The Honourable Member for Tenang touched on the issue that there was no reported shortage of housing supply but a glut of housing was reported, and then the Honourable Member for Tenang asked whether there really is a mismatch, with permission, between demand and supply. For the information of the Honourable Member for Tenang, the total number of unsold residential properties, with permission, over-hanged residential units across the country, as released by NAPIC under the Valuation and Property Services Department (JPPH), is 29,227 units or RM17.238 billion. The State of Johor recorded the highest number of unsold residential properties in Malaysia, namely 5,988 units, or a value of RM3.8 billion. Most of the unsold residential properties are service apartments, with permission, and residential properties priced between RM500,000.00 and RM1 million. Based on the statistics above, it clearly shows that there is a mismatch, with permission, between demand and supply, especially when housing developers try to maximise their profits by building more high-value homes, or high-end properties, with permission.

Mr Speaker, there is also some merit or wisdom in the occurrence of over-hanged properties, with permission, where, on condition that the state government does not interfere, for example the state government does not try to adjust the ceiling on foreign ownership, then what will happen to the market based on the forces of demand and supply, what will happen in such a situation, is a price correction, with permission, a correction to property prices which will act to reduce the price of unsold residential properties. Therefore, this situation will actually benefit the people or buyers. That is to say, in this property market, Mr Speaker, there is a peak condition, or bull market, there is a declining market condition, and when the market declines, it is good for our state government not to interfere. Let us leave the market to the forces of the market, market forces, with permission, of demand and supply to correct prices, so that this is the time when prices will fall and it will benefit the people of the State of Johor themselves.

Mr Speaker, the Poorest People's Housing Programme (Program Perumahan Rakyat Termiskin), or PPRT, I would like to explain the Poorest Housing Programme or PPRT, which was also raised by the Honourable Member for Buluh Kasap in an oral question on last Thursday. The Poorest People's Housing Programme (PPRT) refers to a programme to help and repair or rebuild houses owned by the poor, the hardcore poor, or the asnaf group. Among the agencies commonly involved in PPRT projects are the Ministry of Rural Development (KPLB), and the Johor State Islamic Religious Council (Majlis Agama Islam Negeri Johor, MAINJ). Recently there have also been private parties such as NGOs and corporate social responsibility (CSR) companies that have stepped forward to implement PPRT programmes, one of the latest being Tenaga Nasional Berhad, or TNB. The PPRT programme under the Ministry of Rural Development is as follows. In 2016, there were 261 new-build units and 137, 173 repair units. New construction involved a cost of RM40,000.00 per unit, while repairs involved an allocation of RM10,000.00. In 2017, 60 new-build units and 227 repair units, where the cost of new construction was RM56,000.00, and the repair allowance was also increased to RM13,000.00. For this year, 2018, 32 new-build units and 337 repair units, where new construction is allocated RM56,000.00 per house and the permanent repair rate remains at RM13,000.00. The total for the State of Johor from 2016 to 2018 is 353 new-build units and 737 repair units. The PPRT programme under MAINJ, the Johor State Islamic Religious Council, is as follows: from 2016 to 2017, a total of 352 PPRT units were built at a price of RM42,000.00. There are still 107 units that are not yet completed. For 2018, a total of 20 PPRT units have been approved for construction.

Mr Speaker, I would also like to touch on the matter raised by many Honourable Members, particularly on that side, regarding the development of FELDA areas. In the State of Johor there are a total of 73 FELDA schemes involving 13 Parliamentary seats, 21 State Assembly seats, and a total of 27,290 settlers. Of the 27,290 settlers, 22,653, or 83%, have received individual title ownership. Only 10 FELDA schemes out of the total 73 FELDA schemes in Johor have not yet received individual title ownership. There are various issues faced by the FELDA community, among them land ownership, second-generation FELDA housing, and basic infrastructure in FELDA areas.

Many Honourable Members, especially on that side, raised the issue that the 2019 Budget did not touch on, and indeed there was no allocation provided for, FELDA. Among them were the Honourable Member for Layang-Layang, the Honourable Member for Pasir Raja, and the Honourable Member for Panti. Although the FELDA issue was not specifically mentioned in the 2019 Budget, that does not mean the state government has washed its hands of addressing the issues faced by the FELDA community. Many Honourable Members also raised the issue of FELDA second-generation housing, which I think can be referred to in my oral reply to the Honourable Member for Pasir Raja last Tuesday. The Honourable Member for Penawar touched on the four FELDA new-generation housing projects (PGVF), in short, which have been abandoned and are in the process of re-tendering for those projects. For the information of the Honourable Member, the FELDA Headquarters Administration Department has informed that this matter is still at the stage of technical study at each location involved, so that the valuation of prices or the tenders that should be given will no longer cause problems in the future, and in addition to provide a win-win situation between FELDA and the contractors.

To facilitate the management of FELDA issues, the state government proposes that FELDA settlements that have been granted individual title ownership be gazetted as villages, so that they can easily obtain allocations under the Ministry of Rural Development (KPLB). These FELDA villages must establish a Village Community Management Council, in short MPKK, and not JKKR. This process will also make it easier for the state government to include the maintenance of FELDA roads under the Malaysian Road Records Information System (MARRIS) under the federal government. The Honourable Member for Bukit Permai proposed that the second-generation FELDA lot site scheme be privatised. I accept that proposal well, and the government will consider it carefully.

Mr Speaker, I would also like to touch on the question from the Honourable Member for Kahang regarding the 500 lot units for second-generation FELDA, which were launched before the 14th General Election (PRU-14), but there has been no progress since then. Mr Speaker, the original proposal to build second-generation FELDA housing was 550 units, but after survey work was carried out, the number of lots became 432 units. The proposed construction is in cooperation with the National Housing Company Berhad, in short SPNB. The latest status is that the screening of application forms was completed in 2018. However, this project was postponed because no funds have been received so far.

Mr Speaker, the development of the Orang Asli community. I explained in my oral reply this morning about the development of the Orang Asli community, particularly to the Honourable Member for Senggarang, with reference to the answer I gave this morning. Finally, to conclude, I take this opportunity to thank all agencies under my portfolio that have helped greatly all this time, especially the State Secretary of Johor, Housing Division (SUKJ), the Rural Development Department (JPLB), the Department of Orang Asli Development (JAKOA), the Rubber Industry Smallholders Development Authority (RISDA), the Federal Land Development Authority (FELDA), the Southeast Johor Development Authority (KEJORA), and other agencies. My hope is that the State of Johor will continue to progress in leading change, particularly in carrying the Hope of the Wise Johor Nation.

The full moon, the stars twinkle, the owl weeps longing for its friend; if I have offended with my words through error, I beg forgiveness from all the Honourable Members.

Thus, Mr Speaker, wabillahi taufik walhidayah, assalamualaikum warahmatullahi wa barakatuh. (The House applauds).

SpeakerEN

Thank you to the Honourable EXCO Member, Chairman of the Housing and Rural Development Committee, together with his pantun. Next, the Honourable Chairman of the Committee on Islamic Affairs and Education. Invited to wind up.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Assalamualaikum warahmatullahi wabarakatuh. Salam Harapan, thank you, Mr Speaker. Honourable Dato' Menteri Besar, and all Honourable Members present in the esteemed House this morning. I begin with a pantun.

If the parrot takes flight, its chirping is like a lover's. If the House wishes to shine, its State Assemblyman must always smile. (The House applauds)

SpeakerEN

Don't forget to smile.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Pulau Besar over there at the far end, a place where fishermen stop by, I have heard enough of everything, now it is time to wind up the speech.

I begin my speech by extending my heartfelt congratulations to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan and Yang di-Pertuan of the State of Johor Darul Ta'zim and its dependencies, on the occasion of his 60th birthday on 22 November 2018, which corresponds to 14 Rabiulawal. May Allah SWT prolong the life of His Royal Highness to continue to reign on the throne of the kingdom to shelter all the people justly and equitably.

Mr Speaker, Honourable Members, next, I wish to express my gratitude for having the opportunity to deliver the winding-up speech in this esteemed House, and my highest congratulations to the Right Honourable Menteri Besar of Johor on being conferred the Johor Crown Order, First Class, Dato' Sri Paduka Mahkota Johor, in conjunction with the birthday of Sultan Ibrahim Ibni Almarhum Sultan Iskandar, as well as to our Dato' SS.

In reply to the question from the Honourable Member for Benut, regarding the Harapan Siswa incentive and Parit Raja. The Harapan Siswa incentive is one of the 10 promises of the 100 days of Pakatan Harapan that the government has successfully fulfilled today. As usual, the opposition always says that all the good programmes for the people implemented by today's government are a continuation or copy-paste from the old government. There is no new agenda. But when we change policies or introduce new ideas, we are accused of not respecting the ideas of the old government. I hope the opposition will be more mature about the outcomes of all government policies implemented, whether they add value to the people or not.

The government has no problem continuing a policy or incentive if we are convinced that the previous policy was good. We will continue and even improve it. This is a government of the people; we come to the people and we will serve. I know the opposition is jealous of this Pakatan Harapan government, because we are able to do better than the previous administration. For example, the ICERD rally yesterday. Although the Right Honourable Prime Minister Tun Dr Mahathir Mohamad and our Menteri Besar have announced that ICERD will not be ratified, instead of a protest rally, it became a thanksgiving rally. I think it may never have happened before that the opposition held a thanksgiving gathering because of a government decision. (The House applauds).

The Minister of Federal Territories even welcomed participants from across the country to spend money in KL. But in the past, when people wanted to hold a BERSIH rally or something similar, what waited for them was not flowers but tear gas.

SpeakerEN

Being grateful should be a good prayer. But how about praying to bring down the government, Honourable Member?

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Wallahualam, because we did not hear what his prayer was. As an example, the Harapan Siswa incentive for first-degree students was previously allocated RM750.00. This time the government has increased it to RM1,000.00 per person. This year, PDT, Permodalan Darul Ta'zim, also contributed RM1 million to make the Harapan Siswa incentive a success. Two agencies implement the Harapan Siswa incentive, namely Yayasan Pelajaran Johor (YPJ) and Majlis Agama Islam Negeri Johor (Johor State Islamic Religious Council). If we look at the number of students who received diploma assistance, the aid was distributed three times. The first session was January and February, the second session June and July, and the third session September. After the Pakatan Harapan government took over, applications increased from a small number to a very large one. At the initial stage there were 11 diploma applicants and 91 degree applicants in February for the first session. However, in the second session diploma applicants increased from 11 to 1,096, more than 1,000. Degree applicants increased from 91 to 1,922. The total number of students assisted under the Harapan Siswa incentive, managed by Yayasan Pelajaran Johor, was 3,110, with a total financial amount of RM2,533,750.00. Meanwhile, under the Johor Islamic Religious Council, the amount disbursed was for 575 diploma students and 924 degree students, who were children of asnaf. The financial amount given was RM1,111,300.00.

Regarding the marriage incentive that was asked by the Honourable Member for Machap, the Honourable Member for Panti, the Honourable Member for Layang-Layang and the Honourable Member for Pulai Sebatang, namely that the first marriage course incentive programme is also one of the manifesto pledges successfully implemented by the State Government. This programme took effect in September 2018. In 2018, the government targeted 34,000 participants for the marriage course. Each participant was charged RM120.00, but the number of participants who attended the course in September and October was counted as free courses, namely 6,856 participants.

Of the 6,856 participants, 5,816 participants with a total contribution of RM697,920.00 contributed directly by the course participants. This means they volunteered to contribute to the government. Meanwhile, 1,040 participants claimed back the course fees totalling RM124,800.00. The method used to claim the refund is as follows: we give participants a form stating whether they wish to claim or not claim, that is, to contribute directly. Participants must submit the claim form to the District Religious Office. The application forms received from applicants will be checked and certified by the District Kadi and sent to the Finance Unit of the Management Services Division of the Johor Islamic Religious Department for payment processing. The claim money will be deposited into the applicant's account within 14 days from the date the documents are submitted to the Finance Unit of the Management Services Division of the Johor State Islamic Religious Department. The receipt for the refund claim will be sent by the District Kadi Office to be recorded and distributed to the applicant. Participants are given the choice to claim back or, as I stated earlier, to contribute.

Regarding the answer to the questions from the Honourable Member for Machap, the Honourable Member for Layang-Layang and the Honourable Member for Pulai Sebatang concerning the Johor State Takaful Senior Citizens Programme. This programme is also a new programme implemented by the Pakatan Harapan government, offering assistance of RM1,000.00 to the heirs of deceased senior citizens. No registration fee is charged to participants. Even though accusations are made that we practise favouritism and the like. For the information of the Honourable Members, this programme has a target of 11,200 people, namely 200 people per State Assembly seat (DUN). As of 4 December 2018, the number of recorded participants was 6,415, and payments from the scheme allocated by the government totalled RM320,750.00. The entire target of 11,200 will be settled before or on 20 December this year.

For the information of this honourable House, since the programme was enforced, 10 claims have been recorded. Six of the claims came from opposition State Assembly seats (DUN): two from DUN Panti, two from DUN Seri Medan, one from Kukup and one from Benut. Meanwhile, for government State Assembly seats, there were only four: two from Tiram, one from Puteri Wangsa and one from Johor Lama. All the khairat money will be paid to the heirs of the deceased immediately after the claim money is received by the takaful party.

Regarding Islamic education raised by the Honourable Member for Panti and the Honourable Member for Parit Raja, concerning MARSAH graduates who still have not been called to become DG29 teachers. First of all, I thank Panti and Parit Raja for acknowledging that there have been no DG29 teacher appointments for 3 years. Insya-Allah, I will settle this and take action, and the Islamic Religious Department will implement it. As for the information of the Honourable Member, the Islamic Education Division has taken proactive steps. The religious department has informed the Human Resource Management Division, State Secretary's Office, of the vacancies for DG29 teachers.

The appointment of new DG29 teaching positions is carried out by SPAJ, the Johor State Public Service Commission. Advertisements for DG29 religious teaching positions in the Johor government are always open throughout the year. Everyone who is interested, whether MARSAH graduates, KAFA teachers or members of the public, may apply. Those who meet the application requirements will be called for interviews. MARSAH graduates must compete with external and internal applicants, including KAFA teachers who also hold diplomas in education. This is why not all MARSAH graduates have succeeded in applying to become Johor government religious teachers. In this healthy competition, the Islamic Education Division of the Johor Islamic Religious Department will obtain the best and most qualified teachers, and indirectly this will continuously improve the quality of Islamic education in Johor.

For your information, Honourable Member, a total of 200 KAFA teacher vacancies in the State of Johor will be filled by March 2019 at the latest, to meet the shortage of teachers in Johor Government Religious Schools.

In answer to the questions from the Honourable Member for Pulai Sebatang and the Honourable Member for Semarang concerning the Johor State Islamic Religious Strategic Plan 2030, namely Strengthening the Development of the Ummah in the State of Johor. Do not worry, Honourable Member for Semarang and Honourable Member for Pulai Sebatang, it is the responsibility of the State Government to uphold section 57 of the Undang-Undang Tubuh Kerajaan Johor (UUTKJ) 1895, which states that Islam is the religion of the State forever. The government today has no interest in carrying out the branding of Islam as during the previous BN government era. The government today will continue to uphold Islam, and we will show everyone that Islam is a complete religion of mercy, Rahmatan or Rahmatan Lil Alamin. No organisation in the world may remain static or stay in its comfort zone, comfort zone, with permission, because present and future challenges and competition are becoming increasingly fierce.

Planning is preparation for facing the future. Any organisation that fails to plan is said to be planning to fail. Therefore, the Johor Islamic Religious Department, like other organisations, must be prepared to plan for facing a future that is increasingly challenging and a fierce competition, especially in relation to the needs of Islamic religion, with very limited resources.

Other general objectives of the Johor State Islamic Religious Strategic Planning Plan:

1. To plan the direction, goals, implementation, evaluation and measurement of the performance of agencies within the Islamic Religious Sector to ensure that the delivery of services of the Religious Public Sector is at an excellent level;

2. To give recognition to agencies within the Islamic Religious Sector that have shown the best level of governance and are constantly improving the quality of outstanding services;

3. To give extensive publicity to policies, strategies, quality management and best practices that have brought success to organisations based on Islamic religion.

If we look, Honourable Members in this honourable House, at focus point 37, the Johor State Government has allocated RM500,000.00 for integrated cemetery management in the State of Johor. Unfortunately, not a single Honourable Member touched on this cemetery focus point, even though one day we will certainly return to our eternal home.

For the information of Mr Speaker and the Honourable Members, my side has held several collaborations, meetings and discussions to overcome the critical cemetery problem today, particularly in the Johor Bahru district, involving no fewer than 10 government agencies related to land and so on.

As a result of the meetings, 4 main committees were established, namely the Standards Committee, the Fund Committee, the Land Search Committee and the Inventory Committee, to ensure that the bodies of Muslims who die, especially in the Johor Bahru district, have a place to be buried.

In answer to the questions raised by the Honourable Member for Maharani and also the Honourable Member for Pulai Sebatang concerning Zakat, I have explained the answer at length in my earlier reply.

In answer to the question from the Honourable Member for Parit Raja regarding the many policies of the Ministry of Education Malaysia, I suggest that you contest Parliament later. (House laughs). Your questions are largely about policy, the government's policy at Ministry level. However, there are several matters related to the State, for example the Sultan Ibrahim Scholarship, why was it reduced? In fact, for your information, in 2018 the Sultan Ibrahim Scholarship was allocated RM135,000.00, not RM500,000.00.

Second, regarding the loan from Yayasan Pelajaran Johor. In 2018, RM20.35 million, but in 2019, RM20 million. For the information of the Honourable Member for Parit Raja, that allocation was reduced based on the amount returned, namely 14.5% that was not used last year. Here we can save finances, and the YPJ has set a target of exactly RM20 million.

Regarding the Dana Didik Harapan Johor, where the allocation was RM500,000.00 in 2018. I have to answer this, yes. These are the data and the year. In 2019, RM100,000.00 was given by our Menteri Besar. Why so? Because the applications last year, the total number of applications last year up to 5 December 2018, was only 1,886 people, which means the budget was not needed in such an amount, namely 1,886 people only required RM82,600.00 in funds. Therefore, this year only RM100,000.00 is needed and allocated.

Regarding the question from Pasir Raja, do not neglect the FELDA children in the Johor Education Foundation College. For the information of this honourable House, the children of FELDA settlers in Year 1 number 48 students, in Year 2 there are 402 students, and in Year 3 there are 54 students.

The questions raised by Kahang and Tiram concerning allocations to Tamil National-Type Schools: this year an allocation of RM1.45 million has been implemented and is also in the process of being implemented.

The question raised by Tenang concerning the shortage of teachers. For the information of the House, the State of Johor requires teachers, whether for primary or secondary schools, totalling 46,971 people. Of that total, 19,877 teachers come from outside Johor, which means that Johor's own children or Johor people who become teachers in the State of Johor number no more than 60%. This means 42% are from outside, which also means that applications from outside the State of Johor, based on the reasons they have, are very large, causing difficulty in retaining sufficient teachers or school teaching staff.

In answer to the question on English from Parit Raja, that English language enrichment programmes such as the Galus SPM and also UPSR programmes continue to be implemented at school level to ensure that our pupils and students can answer well and succeed in mastering English.

In answer to the question from Senggarang regarding assistance received by the children of fishermen and Orang Asli children, after verification from e-Kasih: early school assistance of RM100.00, Kumpulan Wang Amanah Pelajar Miskin (e-Damak) assistance of RM100.00, and the Supplementary Food Programme of RM2.50 per person for 190 days, namely RM475.00 per year.

Regarding the library issue raised by the State Assemblyman (ADUN) for Maharani and the State Assemblyman for Pulai Sebatang. We are aware that the State of Johor has 42 village libraries and 16 branch libraries, built since the 6th Malaysia Plan, some of which are in dilapidated condition. The State Government needs to take the initiative to upgrade the libraries in stages. If we look, their headquarters library has undergone transformation to remain relevant in the 21st century by making the library a fun learning place and active partner in the education system, with permission. For this purpose, libraries now cover 4 excellent services, namely library services, petro science services, marker space services and front services, which are found in our main library at Jalan Yahya Awal. The district with the largest number of visitors is Johor Bahru, with 523,600 people, while the district with the fewest is Pontian, with 22,239 people. The total number of visitors to all libraries in the State of Johor is 1,073,660,000 people.

To answer the questions raised by Tenang, Panti, Sungai Balang, Parit Raja, Senggarang and Layang-layang concerning a Johor University. Johor already has 2 colleges under the management of Kolej Yayasan Pelajaran Johor (KYPJ) and Kolej Pengajian Islam Johor, namely MARSAH. Given current development needs and industry demand for skilled manpower, as debated by the Honourable Member for Layang-layang, who stated that the current need is for the State Government to focus on skills fields rather than adding universities, for example the Pengerang Complex urgently requires highly skilled workers, and now we have to import labour and professionals from outside Johor. Therefore we decided, the Pakatan Harapan Johor government decided, to upgrade 2 colleges owned by the Johor government to university status.

The concept of Universiti Johor has a unique value proposition of its own compared with existing universities. The planning of Universiti Johor has been carefully done to ensure that this university is financially sustainable and truly fills different needs and complements existing institutions. The establishment of Universiti Johor will be implemented in 3 phases, namely planning, operation and implementation. Among the factors that make Universiti Johor different is the concept of Universiti Johor, federated and consolidation, cord helix or industrial university, the Community Government Industry University will be introduced. Industry will become part of the university, relevant industries will become industry-lift from year 1, and case-study research based on the university will be detailed. Universiti Johor is also planned together with industry to produce the type of graduates required at the end of their studies. Courses will be planned according to field and industry needs in a jux box style offering. The urbanisation concept is also under study. This plan can support the Industrial Revolution 4.0. In addition, industry involvement incentives will be introduced such as tax cuts, settlement grants and others. The establishment of industry, the establishment of Universiti Johor, is relevant to meet the demands of rapid development in the State of Johor. As for the chronology of the establishment of Universiti Johor, we have held meetings, several meetings, and the latest was a brainstorming session on the needs of Universiti Johor, involving mostly expert manpower in universities, including government departments, agencies, GLCs and also industry players.

Honourable Speaker, before I conclude my winding-up this morning, let me share the experience in this honourable House. In the 13th term, we realised that as an opposition, we were previously not recognised as Opposition Leader even though we proposed it several times. The Opposition Leader had no allowance, the Opposition Leader had no office, the opposition had no allocation for State Assemblyman office matters, but we still attended breakfast, lunch and afternoon tea together in the State Assemblymen's rest room. Together we clapped and patted each other on the back, even though the Honourable Member for Sedili, the Honourable Member for Sedili, yes, often taunted me, mocking Parit Yaani during his speech. We, the opposition, still attended the State Assemblymen's rest room. In the last term, the Honourable Member for Mengkibol, the Honourable Member for Tangkak, the Honourable Member for Sungai Abong still went into the smoky room with the Honourable Member for Tenggara, the Honourable Member for Sedili, the Honourable Member for Benut, the Honourable Member for Medan, eh Seri Medan,

SpeakerEN

These relatives who smoke.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

To burn incense.

Speaker

Rakan-rakan rokok,

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

To drive away mosquitoes even in air-conditioned places. What Parit Yaani seemed to want to say this morning is how much we practised democracy since becoming the opposition. We continued this when we became the government now. We have experienced being oppressed when we wanted to hold ceramah and assemblies. They sprayed us with tear gas, batons, black Maria vehicles, and we were detained overnight in the lockup, including Mr Speaker.

SpeakerEN

Which Speaker, the one from before or the one now?

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Dulu-dulu. Tapi kami teruskan berusaha mendekati rakyat dengan menerangkan pelbagai isu berbangkit secara demokrasi. Kami usahakan surat khabar sendiri seperti akhbar amanah, akhbar keadilan, akhbar roket yang tidak pernah menerima sebarang saman dari mahkamah atas sebab fitnah. Alhamdulillah, sekarang kerajaan pakatan harapan di bawah pimpinan the Honourable Prime Minister Tun Dr. Mahathir dan the Honourable Dato' Menteri Besar kita akan terus berusaha menjadikan negeri, negara Malaysia dan Johor kembali kepada kecemerlangannya seperti yang silam-silam. Kakitangan kerajaan tidak di ganggu untuk menjalankan tugas dengan penuh amanah, berintegriti, boleh membuat siasatan, membuat pendakwaan dan berani membuat keputusan dengan adil dan saksama sekiranya ada di kalangan ahli-ahli politik ataupun di pihak kerajaan yang melakukan kesalahan.

Parit Yaani ingin menjelaskan kepada semua kakitangan awam, pimpinan politik dan semua rakyat termasuk ahli perniagaan, bahawa negara kita ada undang-undang. Negara kita ada kedaulatan dan negara kita perlukan pimpinan yang boleh membawa keamanan, kemakmuran dan kemajuan kepada rakyat jelata. ADUN-ADUN kerajaan, ini lah harapan dan daripada rakyat yang telah berani buat perubahan dalam pilihan raya 14 tanpa sebarang kekacauan. Di sangka panas hingga ke petang, rupanya hujan di tengah hari. Di sangka BN parti yang menang, rupanya PH mandat diberi. Hebatnya rakyat Malaysia, hebatnya Johor people saya ingin mengucapkan ribuan terima kasih kepada semua Ahli Yang Berhormat yang telah memberikan pandangan, cadangan dan pertanyaan, tidak dilupakan kepada semua kakitangan awam kerajaan Johor dan kerajaan persekutuan atas usaha yang telah dilakukan dalam membangunkan negeri yang kita cintai dengan penuh tanggungjawab dan profesional.

Saya berjanji akan memberi perhatian sewajarnya kepada semua cadangan dan teguran demi kepentingan awam terutamanya dalam bidang agama Islam dan pendidikan di mana saya di amanahkan untuk menjaganya. Akhir sekali, Mr Speaker, ingin saya menarik perhatian kepada semua mengenai satu kisah zaman Nabi Musa AS, Nabi Musa AS melihat bangkai seekor anjing yang mati di padang pasir, bersama-sama dengan sahabat-sahabatnya. Sahabat-sahabat Nabi Musa AS menutup hidung, malah ada yang loya dengan keadaan mata anjing yang hampir pecah dan isi perut yang terburai akan tetapi Nasi Musa AS berkata alangkah putihnya gigi anjing itu, maka sahabat-sahabat Nabi Musa bertanya kepada Nabi Musa. Mengapa boleh berkata demikian. Lalu Nabi Musa menjawab aku sedang belajar melihat kebaikan dan kecantikan di dalam keburukan. Pengajarannya di sini semoga kita semua boleh melihat kebaikan di dalam diri seorang waimah musuh kita sekalipun. Insya-Allah hati kita akan bertambah senang dan tenang. Jadilah seperti lebah walaupun hidup di dalam lautan sampah, bunga juga yang dicarinya. Jangan lah jadi seperti lalat walaupun hidup di taman yang indah sampah juga yang dinantikannya. Semoga ikatan kita sang insan akan lebih erat dan harmoni tanpa ada rasa dengki, iri hati dan benci membenci. Sekiranya kita melihat sesuatu yang buruk pada orang lain ia adalah cerminan untuk diri kita kerana hanya orang yang hatinya bersih selalu melihat kebaikan pada orang lain. Saya menyokong pembentangan belanjawan Johor 2019 yang telah dibentangkan oleh the Honourable Dato' Osman bin Sapian, Menteri Besar Johor. Sekian terima kasih, Assalammualaikum warahmatullahi wabarakatuh.

SpeakerEN

Terima kasih kepada Ahli Yang Berhormat Pengerusi Jawatankuasa Hal Ehwal Agama dan Pendidikan. Yang Berhormat sebut saya pernah ada dalam lokap. Jadi kalau ahli-ahli pembangkang nak belajar hidup dalam lokap saya boleh kursus percuma. Tandas tanpa dinding, tidur di atas lantai simen. Tak silap saya Yang Berhormat Menteri Besar pun pernah ada pengalaman itu. Ok. Dari Selama ke Parit Sulong, ini semua orang pantun saya pun buat pantun sikitlah ye. Parit Selama ke Parit Sulong, bawa bersama buah Bidara, EXCO Agama selesai menggulung, tiba masa MB berbicara. Jemput yang Amat Berhormat Menteri Besar untuk menjawab.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Thank you, Honourable Mr Speaker. Bismillahirahmanirahim. Assalammualaikum warahmatullahi wabarakatuh, greetings of peace and greetings of hope to Johor. Honourable Dato' Speaker, first of all, allow me to record my highest appreciation and heartfelt thanks for the firm support given to my leadership, namely the Pakatan Harapan government, and for the constructive criticism from the opposition throughout this sitting of the State Legislative Assembly.

I also do not forget to thank the Honourable Mr Speaker and the Honourable Deputy Speaker, for being able to carry out their duties perfectly and very well. I extend my thanks and congratulations. (The House applauds.)

In addition, I would also not be remiss in thanking Cik Jurutulis (the Clerk), the Deputy Clerk, the heads of departments, and also my EXCO members, who are brave, enthusiastic, and always eager to learn from mistakes. Although they have less experience, the spirit of my EXCO members is extremely high. I extend my congratulations and thanks. (The House applauds.)

Likewise, to the heads of departments led by the Honourable Dato' State Secretary of Johor, and the State Financial Officer, who have never ceased to provide views, support and very good cooperation.

I also extend my thanks to all who were involved in making the Third Meeting of the 2019 Johor Budget for the First Session of the 14th Johor State Legislative Assembly a success. Hopefully, the tabling of the 2019 Johor Budget can be put to good use, so that the people can benefit and see that the development of the State of Johor will continue to progress from time to time.

Next, I humbly convey my most profound gratitude for the consent of His Royal Highness the Sultan of Johor in bestowing upon me and also upon the State Secretary of Johor the Most Esteemed First Class Order of the Crown of Johor, Dato' Sri Paduka Mahkota Johor (SPMJ).

All the wise advice, sound views and constructive criticisms from His Royal Highness the Sultan have also been received by us with the best intentions, and we will ensure that we improve our services in line with the aim of making Johor a High-Performance State, a Johor Bestari Nation. The Pakatan Harapan Government pledges to do its best for all the people of the Johor Nation.

I wish to express my thanks for the support expressed during the debate by the Honourable Members for Penggaram, Perling, Pulai Sebatang, Tenang, Pemanis, Bukit Naning, Bukit Permai, Senggarang, Tangkak, Endau, Pekan Nanas, Larkin, Machap, Layang-Layang, Sungai Balang and Gambir, as well as the other Honourable Members.

I am confident that the trust and support expressed came sincerely from the hearts of all the Honourable Members. Although, in principle, our Pakatan Harapan government only took over the administration of the Johor State Government less than a year ago, we have a vision to maintain and ensure that the progress of the State of Johor does not stop merely because of a change of government.

We will ensure that Johor continues to remain progressive, and that we are clear about the direction we take for the State of Johor. Therefore, I would like to call on everyone to maintain unity and work together to ensure that the administration of the State of Johor is at its best.

The finances of the State of Johor under the Pakatan Harapan government are in a strong position, and the state government is able to table a surplus Johor Budget 2019. The first tabling under this government today sees a surplus of RM3.43 million, an increase of RM2.29 million compared with RM1.14 million last year. This is a positive development, and I would like to take this opportunity to invite all parties to join together in giving their best to the State of Johor and all its people.

I would like to call on and invite the side over there to also contribute sound ideas in our efforts to ensure the State of Johor can maintain its momentum, and to stop the blame game. Let us come together to provide the best services to the people of the State of Johor.

Honourable Mr Speaker, the claim that the Johor Budget 2019 is "copy and paste". Firstly, I would like to respond to the Johor Budget 2019 throughout this sitting of the House. We have heard various responses regarding the Johor Budget 2019.

This matter has not only received immediate comments from the side over there after its tabling on 29 November, but it is also still being hotly discussed, as raised in the arguments of Benut, Kahang, Tenggaroh, Panti, Tanjung Surat, Penawar, Sungai Balang, Penggaram, Layang-Layang, Pasir Raja, Buluh Kasap, Bukit Permai and Semarang in this august House.

I feel that what I want to answer has already been answered by the Honourable Chairman of the Religious and Education Committee earlier. I notice that there are debaters who give constructive criticism, and there are also not a few who merely wish to criticise without proposals for improvement.

Among the claims thrown out by the Honourable Members on the side over there is that the first budget of the Pakatan Harapan government this time is "copy and right", with permission, a 3R budget, namely Recreate, Rebrand and Recycle. This has also been explained by the Honourable Chairman of the Religious and Education Committee earlier.

In the eagerness of the side over there to point fingers at the government which today tabled the budget, initiatives of previous governments, my one question is, how do the Honourable Members calculate the total number of focus points that have been copied by the government today.

This is because I have found that four Honourable Members from Barisan Nasional gave different percentage figures. It seems that among them there is no understanding and they do not provide correct facts.

Semarang, in his argument, stated that the reality of today's budget is only 87% repetition of the previous government's, Panti stressed that 85% of the budget's substance is initiatives of the previous government, while Penawar claimed that 83% of the budget is ideas from the Barisan Nasional government that were tabled by the former Menteri Besar of Johor. Tenggaroh made the same claim, where 80% belonged to the previous government. This has also been openly answered by the Honourable Chairman of the Religious and also Education Committee earlier. Therefore, I am pleased to give an explanation here: the total number of focus points in the Johor Budget 2019 is 207. Of that total, 91 focus points are new initiatives introduced by the Johor state government.

I would like to stress here that, as a pro-people government, we do not neglect any existing initiatives, and in fact we make improvements based on the aspirations and current capacity of the Johor state government. Among them, the Johor state government, through the Johor Education Foundation, has improved the Harapan Siswa Incentive. This is also as informed by the Honourable Chairman of the Religious and Education Committee earlier.

Apart from that, the government has also highlighted the creative economy sector, which ensures the continued vibrancy of the Johor economy, and also provides opportunities for people in this field and makes it a focal economic activity in the district of Kluang. This is one of the ideas or reforms carried out by the Pakatan Harapan government today.

I would like to emphasise that the Johor state government is a state government that takes into account feedback from the voice of the people based on the philosophy of democracy, namely, "from the people, by the people and for the people in every development plan". Therefore, any initiative that brings well-being to the people of Johor, we will continue, to ensure that the economic growth of Johor is not hampered. This is the beauty of the parliamentary democratic system that we practise. The combination of ideas from the government and the opposition is refined and improved, and the result is that the people gain the greatest benefit.

I would also like to answer a question regarding the Delay in the Process of Transfer of Ownership of Places of Worship. Subsequently, Penggaram raised the issue of approval for Non-Muslim Places of Worship, or in short RIBI, which takes quite a long time. For the information of the Honourable Member, the state government uses the Circular Letter of the Johor State Security Working Committee (JKKN) No. 2/98 as a guideline. For any application to build new, restore, renovate and enlarge a RIBI, consideration must be given by JKKN.

Approval of RIBI will take some time because the application must be brought to the District Security Working Committee (JKKD) meeting. Government departments such as the Local Authority (PBT), the District Land Office, the Irrigation and Drainage Department (JPS), the District Police Headquarters (IPD), the Town and Country Planning Department (JPPD), and the Islamic Religious Department will provide technical comments before consideration is made at the JKKD meeting.

The departments concerned will look at the suitability of the site, security factors, the effect on the harmony of the local neighbourhood, development planning in the environment of the proposed site for the RIBI construction, as well as the suitability of the design and structure of the building in accordance with the laws of each relevant department. Only then will the decision of this JKKD be brought to the JKKN meeting for scrutiny, consideration and subsequently approval.

The procedure established is precisely what causes the application process for these places of worship to take time, because it must be examined one by one, or with permission, case by case. Among the causes of an application taking time is that some owners of places of worship build structures first before making an application. In order to expedite decisions on applications, the Johor State Security Council, through the Johor State Security Working Committee, has agreed to set up a Non-Muslim Religious Buildings Sub-Committee to examine all new applications as well as appeal cases for applications that have been rejected, as per the decision of the JKKN meeting on 25 September 1996.

Next, regarding the Community Assistance Programme for the Indian Community, I wish to touch on the allocation for the Indian community raised by Kahang and Tenggaroh. Honourable Members of the House, it has never crossed our minds to cheat or oppress the Indian community as claimed by the side over there.

We have approved an allocation of RM3 million for entrepreneurs, welfare and the repair of schools for the Indian community. It must be understood that the provision of this assistance is very transparent and in accordance with current needs. This does not include additional allocations, which may be given directly by me and also by the other Honourable Members, or there are one-off allocations, with permission.

Kahang's proposal to set up a Special Affairs Unit for the Indian community in the State of Johor is a proposal that is already outdated. For everyone's information, every district has an Indian Community Liaison Officer stationed at the District Office.

I also have a special assistant from the Indian community who looks into, examines and resolves the problems of the Indian community from time to time. They will receive issues directly, go down to houses to conduct further investigation into complaints made, and then provide appropriate assistance through aid-providing agencies such as the Social Welfare Department (JKM) and so on. In fact, the Honourable Member for Bekok will chair the monthly meeting with the Indian Community Liaison Officers in every district to coordinate various issues involving the Indian community in Johor.

So I ask Kahang and Tenggaroh not to worry. All issues arising or problems faced by the Indian community will be discussed by me and I will seek solutions together with the Honourable Members for Tiram and Bekok.

However, I am slightly disappointed because I regard the act of questioning race-based assistance as outdated and immature political games by the previous government. With the spirit of New Malaysia, the state government provides various assistance without distinguishing race, religion or even political ideology. This can be seen through the Johor Harapan Incentive, such as the Johor Healthy Card, the Free Water Programme, the Affordable Housing Voucher and many more. All this assistance is given fairly and equitably to those who are eligible, because we are all the Johor Nation.

I would like to raise the issue of the write-off of the state government's debts by the federal government. Next, I would like to speak on efforts to ensure that the state's financial position is healthy. I feel it is necessary to give an explanation and emphasis regarding the issue of the write-off of the state government's debt by the federal government amounting to RM189 million, as raised by the Honourable Member for Benut.

Honourable Mr Speaker, for the information of this august House, the latest position of the outstanding debt of the Johor state government to the federal government is RM520.94 million, where the breakdown of the loans is as follows:

1. Water Supply Project - RM334.5 million 2. Johor Corporation (JCorp) - RM50.27 million 3. Low-Cost Public Housing Project - RM16.57 million 4. Other Loans - RM123.36 million

Therefore, as soon as the Government-to-Government Loan Settlement Agreement between the Federal Government and the Johor State Government is finalised, the amount of state government debt that will be written off by the federal government is RM289 million, namely RM100 million for the Emergency Raw Water Transfer Project from the Raw Water Supply Scheme to the Refinery and Petrochemical Integrated Development, Pengerang, with permission, or PAMER, to the Upper Layang Dam, and RM189 million more for the rural water supply project loan, which is part of the state government's water supply project debt of RM334 million.

Meanwhile, the balance of the water supply project debt of RM145 million is at the final stage of negotiations between the state government and the federal government.

In addition, for the Johor Corporation loans, namely Johor Corporation, these are repaid according to the Repayment Schedule as stipulated in the agreement with the federal government. Other loans made by the state government from the federal government are loans to finance the State Building Rehabilitation Project totalling RM64 million.

For the information of this august House, no interest is charged on these loans. The stipulated repayment period is 20 years, and the state government will begin repaying the loans in 2019 with an amount of RM3.2 million a year.

Accordingly, the projected total balance of the Johor state government's loans from the federal government is RM231 million, which comprises RM145 million, being the outstanding balance of the water supply project debt; RM22 million, being the outstanding balance of loans for projects under Johor Corporation; and RM64 million for other loans. I admit that efforts to obtain the write-off of this debt were made by the previous administration, but they were not successful, perhaps due to a lack of seriousness.

Honourable Member for Benut, when we talk about the state government's debt with the central government, one thing we need to see as the cornerstone of its resolution is good relations between leaders. Perhaps I have good relations with the Prime Minister. Many administrative matters can be discussed by us together and agreement can be reached for the good of all parties, especially the Johor Nation. I myself met the Minister of Finance at his office in Putrajaya to discuss this matter. Furthermore, in July, the Minister of Finance himself came to my office to examine more closely the issue of the write-off of the state government's debt by the central government.

However, this is very different from what happened before, when the Honourable Menteri Besar perhaps had no relations, so that many matters involving the state government and the federal government were postponed and could not be resolved.

Honourable Mr Speaker, I would like to touch on the increase in allowances for State Assemblymen and Council Members. Furthermore, regarding financial matters, the Honourable Members for Pemanis, Tangkak and Senai requested that consideration be given to reviewing the allowances of State Assemblymen and Council Members with a view to increasing them.

In my view, an increase in salary or allowance is not necessary at this time, because in less than a year of this administration there is still a lot to be done. ADUNs and Council Members also need to prove that we truly serve the people who have entrusted us with this responsibility.

Moreover, as a cost-saving measure, the salaries of the Members of the State Executive Council (EXCO) have also been cut by 10% until today. This austerity measure is not merely political rhetoric, because several Local Authorities (PBT) will table deficit budgets this year. However, as a measure to reduce the financial burden, the state government has taken the initiative to give balancing grants to the PBTs concerned, with a total amount of RM13.7 million.

Honourable Mr Speaker, the issue of establishing the Johor State Economic Council. The Honourable Member for Gambir proposed that the government establish the Johor State Economic Council, which was warmly welcomed by the Johor state government. This is to ensure the economic development of the state moves more rapidly and sustainably. In this regard, the state government, through the State Economic Planning Unit of Johor, or in short UPENJ, will serve as the secretariat to the Council to be established in the future, by identifying economic experts, academics and industry players, business chambers and relevant stakeholders. Perhaps the closest model that could serve as a foundation is the establishment of the Malaysian Institute of Economic Research (MIER), but the establishment of the Johor Economic Council will focus on a unique mould, prioritising the identity, strengths and existing opportunities as well as the potential of the State of Johor. Hopefully, the establishment of the Johor Economic Council can be realised and, most importantly, can play the role of a captain in determining the direction of the state in line with the purpose of establishing the council.

Like the old saying, a single lidi (palm frond midrib) is very fragile, but the integrity of a handful of lidi cannot easily be broken. Only with the unity of all interested parties will the State of Johor become stronger and more formidable.

Honourable Mr Speaker, the monitoring of government-linked companies, or in short GLCs, and forensic audits. Next, Mengkibol and Semarang touched on the intention of the Johor state government to carry out a Forensic Audit of Johor Government-Linked Companies. From my examination, it is not only because of the debts borne by the GLCs, but there is indeed leakage occurring in these Johor GLCs. For example, JCorp, which has debts totalling RM4.16 billion. I do not deny that JCorp has given returns to the people of Johor in various forms of assistance, such as the construction of the An-Nur waqf clinic and hospital, providing employment opportunities, building affordable housing through its subsidiary Johor Land, and much more. We also acknowledge that JCorp has without fail fulfilled its debt obligations according to the stipulated schedule. However, there is still a need to carry out a forensic audit to see the operations of all these Johor GLCs, in case any leakage has occurred. We will bring all the initial financial reports of these GLCs to the Public Accounts Committee (PAC) of the Johor State. Furthermore, we will appoint independent professional audit experts to see whether there has been any leakage by the previous state leadership. The next step, such as legal action, will be taken if such leakage is proven.

Honourable Mr Speaker, the highest water tariff rate in Johor. Honourable Mr Speaker, next I would like to comment on the water tariff rate, where Bentayan has requested a review and re-examination of the tariff rate. The state government is aware that the water tariff in this state is the highest compared with other states. I am aware that the issue of water tariffs is one of the issues close to the hearts of the people. The state government also has a very strong commitment to strive to reduce the water tariff. However, we must realise that the state government only holds a minority shareholding of 20% in the sole water provider of the state, namely Ranhill SAJ. Because of that, it is difficult for the state government to make a decision if it does not get the agreement of the Board of Directors to reduce the water tariff. Although the state government has powers, we also need to discuss from time to time with this company. The state government is conducting ongoing negotiations to ensure the people can enjoy a lower water tariff rate. Ranhill SAJ has also stated its formula for reducing the water tariff rate, but the formula is seen as not favouring the state government.

I would like to remind Ranhill SAJ to adhere to their slogan "Setitis yang bermakna." As a state government, any decision made must be pro-people or prioritise the people. But if such efforts reach a deadlock, the state government may have several other strategies to ensure that the water tariff rate is eventually reduced.

Among them, the state government plans to set up a new water company using Japanese technology. (Applause from the House.) Meanwhile, the implementation mechanism is currently being studied. This effort must be made to avoid the monopoly of one company that could act arbitrarily because there is no competition or other providers.

Honourable Mr Speaker, the International Convention on the Elimination of All Forms of Racial Discrimination (ICERD). Next, I would like to comment briefly on the issue of the International Convention on the Elimination of All Forms of Racial Discrimination, or ICERD. Thank you to Pemanis for supporting the state government's decision on this issue. The decision not to ratify ICERD is a consensus decision made by the Pakatan Harapan government. We hold to the same position. Only my request is that this issue should not be politicised any further, because in the end it will lead to division between us. We in Johor should set a good example. We must reject legislation that is inconsistent with the Federal Constitution and the Johor State Constitution Law 1895.

Honourable Mr Speaker, touching on allocations and assistance to FELDA. This has also been explained to a certain extent by the Honourable Chairman of the Housing and Rural Development Committee. Now, I will touch on the issue relating to the Federal Land Development Authority, or in short (FELDA), as raised by the Honourable Members for Benut, Kahang, Pemanis, Tenggaroh, Sedili, Johor Lama, Bukit Permai, Panti, Buluh Kasap, Penawar, Pasir Raja and Layang-Layang.

As is well known, FELDA is currently experiencing a very critical cash flow problem due to weaknesses in corporate governance and irresponsible financial management, which ultimately resulted in FELDA bearing debts amounting to RM8 billion. This debt is a legacy inherited from the previous leadership. Essentially, the Johor state government has always prioritised the welfare of its people, including FELDA. The arguments debated in this sitting of the House have questioned housing for the second generation, FELDA was not included in the focus points of the Johor Budget 2019, and the FELDA community has been marginalised. In principle, the state government has never marginalised any group of people in this state, including development focused specifically on the communities in FELDA and also FELCRA, which is one of the eight categories of villages.

Among the plans that have been prepared is through the preparation of the Johor Village Strategic Direction Plan, which will begin to be implemented in 2019, thereby complementing the National Village Physical Planning Policy 2030. This strategy will, among other things, focus on aspects of increasing village activity and productivity, sustainable environmental management and the provision of effective infrastructure. Meanwhile, in terms of the granting of land ownership titles, the state government is committed to expeditiously resolving applications for ownership by original settlers.

In the tabling of the Johor Budget 2019, under focus point No. 149, namely Settlement of Communal Land Applications, the Land and Mines Office will settle 5,767 land applications involving 9 districts in stages, and among the areas involved are FELDA Tenggaroh 1 and FELDA Tenggaroh 7 in the district of Mersing. The ceremony for presenting Notice 5A to eligible FELDA settlers will be held early next year.

For the second generation of FELDA, the state government is also ready to consider applications for house plots. This granting mechanism is carried out either by directly granting house plots to eligible applicants among the second generation, or by granting a plot to FELDA, which will then develop a residential area under the New Generation FELDA Housing Programme (PGBF) by FELDA itself and sell it to the second generation. At present, land applications received will be processed based on the guidelines of the Director of Land and Mines of Johor dated 27 September 2004 for the purpose of granting house plot lots to the second generation in FELDA in the State of Johor. The state government has the intention and plans to improve the religious schools, mosques and surau located within FELDA areas.

We take note that Section 34 of the Communal Settlement Areas (Land) Act 1960 (Act 530) concerns the vesting of land rights in FELDA when the State Authority declares under section 4 that the areas will be developed by it. This means that this responsibility is under FELDA's management. For this purpose, the state government will discuss with the Ministry and FELDA to enable the sites of mosques, surau, religious schools and other Islamic reserves to be given ownership to the Johor State Islamic Religious Council as the sole trustee of all waqf in the State of Johor. These discussions will be carried out to ensure that this process runs in line with the provisions contained in Act 530 as well as to fulfil the Johor State Islamic Administration Enactment.

With such efforts, the state government through the Johor Islamic Religious Department and the Johor State Islamic Religious Council can monitor and repair religious schools, mosques and surau in FELDA areas, and directly this will benefit the residents and villagers of FELDA. For the information of this august House, apart from the question of land grants raised by the Honourable Members, the state government is also concerned about the development, infrastructure and socio-economic aspects of the second generation of FELDA. The state government will provide infrastructure such as building roads, providing street lights and water supply, in an effort to guarantee the well-being of FELDA residents. The state government will also identify areas that still lack adequate basic needs and make estimates of the expenditure to be borne in order to complete the lives of FELDA residents.

To strengthen the socio-economy, the state government will empower Small and Medium Industries (IKS) and encourage modern agriculture such as using hydroponic and fertigation methods. This will indirectly open up entrepreneurial space that can further improve the standard of living of FELDA residents. For the Honourable Members, as additional information regarding the issue of land ownership for the second generation, I would like to read out a short list of second-generation FELDA members who may be considered for land grants for house plot lots in 2019. First, the district of Mersing for the State Assembly seat of Tenggaroh, FELDA Tenggaroh 3, involving 191 application plots for land totalling 23 acres. Second, the district of Kota Tinggi for the State Assembly seats of Sedili and Johor Lama. For the State Assembly seat of Sedili: FELDA Bukit Easter, FELDA Bukit Waha, FELDA Tenggaroh Selatan 1, FELDA Aping Timur, FELDA Aping Barat, FELDA Simpang Waha. For the State Assembly seat of Johor Lama: FELDA Lok Heng Selatan, FELDA Lok Heng Timur, FELDA Lok Heng Barat. The total applications for the State Assembly seats of Sedili and also Johor Lama number 3,000 applicants. All these applications have been issued a schedule, number one, namely the Land Application Form by the Land and District Office. All these land applications are processed based on the guidelines of the Director of Land and Mines of Johor dated 27 September, for the purpose of using house plot lots for the second generation in FELDA in the State of Johor. Insya-Allah, we will realise these applications.

Honourable Mr Speaker, I would like to touch briefly on the status of Pulau Kukup as the Johor National Park. I would like to take this opportunity in this winding-up session to give a brief explanation regarding the status of Pulau Kukup, in Pontian. The issue of Pulau Kukup's status as a National Park has caused concern among the people to the extent that some have made petitions objecting to the removal of that status. For the information of all Honourable Members, the decision to remove the status of Pulau Kukup as a National Park was made in the State Executive Council meeting on 7 March 2018, when BN was administering this state. This action was only known to my administration when the cancellation of the reserve was gazetted after obtaining approval from the MMK during the BN administration, and was subsequently reported by the media. I admit I was shocked by the news report, especially when some colleagues in Pakatan Harapan accused the state government administration of approving the removal, when in fact it happened under the previous administration.

As is generally known, the change in the status of the National Park was made to place Pulau Kukup as Sultanate Land so that the island would continue to be better protected following its change of status. In short, when an area is changed to Sultanate Land, it is provided for in the Sultanate Enactment 1934, meaning that no development whatsoever may be carried out in that area. However, the explanation regarding the release of Pulau Kukup's status, which is recognised as a mangrove swamp forest island, still fails to allay the concerns of the people. As a state government that is grounded on the people, I will ensure that Pulau Kukup remains the Johor National Park. (Applause from the House.)

As a result of discussions, His Royal Highness Tuanku Sultan Ibrahim Ibni Almarhum Sultan Iskandar has graciously agreed that Pulau Kukup shall continue to be used as a National Park area and shall be looked after and regulated by the state government under the Johor National Park Corporation. This aims to make it a tourism product now and also in the times to come. I humbly give thanks for the gracious command of His Royal Highness Tuanku. This action shows Tuanku's concern for the importance of mangrove swamp forests, which act as natural wave breakers, and also for preserving biodiversity and the interests of the people. The status of Pulau Kukup has also been proposed in this House, and I agreed to inform that this motion would be discussed in the MMK. Therefore, the issue of Pulau Kukup should not be prolonged further, since it remains the Johor National Park, Pulau Kukup.

In this august House too, I, as a people's representative and also the Chief Executive of the State Government, wish to stress that the interests of the people will be put first despite facing various obstacles. I am no puppet of anyone, but I am ruled by the people who have given their trust to me. This I will never betray. Be assured, I and the EXCO team will continue to work hard to ensure that this state remains sovereign. We will never betray the rights and the trust of the people.

Honourable Mr Speaker, before ending my winding-up speech, I would like to express my highest appreciation for the support of the Honourable Members of this House for my leadership and for all the state civil servants of Johor once again. I and the EXCO team as well as the civil servants in Johor will continue to strive to give our best to the people and to this State of Johor. I hope the Honourable Members can think more rationally and openly. This House deserves for us to share ideas and reach understanding in providing welfare to the people, and not for individuals who constantly look askance at the government of today.

Let us set aside all differences between us in building up and developing this state, so that we are able to raise the State of Johor to become the best state in the country and even in this region.

I am not skilled at composing pantun like my other EXCO members, but there is just one pantun:

If there is a well in the field, may I bathe there too? If there is a long life, we shall meet again next year.

Speaker

Insya-Allah.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Thank you. With the guidance and blessing of God, peace be upon you and the mercy and blessings of God.

SpeakerEN

Thank you to the YAB who has wound up the debate.

The question before this House is that the Supply Enactment (2019) Bill 2018 be read a second time now.

Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative. This Bill is read a second time.

ClerkEN

An Enactment to authorise the use of a sum of money from the Consolidated Fund for services for the year 2019 and to appropriate that money for services for that year.

The House resolved itself into a Committee.

Clerk

JADUAL.

ChairmanEN

The matter before this Committee is the sum of RM1,617,000.00 for Head of Expenditure B.01, Public Service Commission, to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

For the Purpose of Supply B.01, the allocation of RM1,617,000.00 is required for the administration of the Public Service Commission office. Of this amount, RM880,000.00 is required for the payment of emoluments and allowances to department members, and the balance of RM737,000.00 is for other management expenditure.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM144,604,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Speaker, for the Purpose of Supply B.03, Office of the State Secretary, the allocation of RM144,604,000.00 is required for the management and administrative expenditure of offices under the control of the Office of the State Secretary in implementing government programmes and activities to advance and improve the standard of living of the people of the State of Johor. The allocation required for each activity is as follows:- Management Division, RM28,761,000.00; Miscellaneous Services, RM44,734,000.00; Menteri Besar Johor, RM14,721,000.00; Johor State Economic Planning Unit, RM6,384,000.00; Johor State Legislative Assembly, RM19,335,000.00; Human Resource Management Division, RM7,462,000.00; Internal Audit, RM1,124,000.00; Grants to Agencies, RM14,750,000.00; Sultan Ibrahim Camp, RM7,333,000.00.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM31,011,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

For the Purpose of Supply B.03, Office of the State Secretary, a sum of RM31,011,000 is provided for the implementation of the following activities:- Local Government, RM11,991,000.00; Johor State Science, Technology and ICT Division, RM17,246,000.00; Landscape, RM1,774,000.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM7,925,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

An allocation totalling RM7,925,000.00 is provided under the Purpose of Supply B.03, Office of the State Secretary, provided for management and administrative expenditure under the Housing Division.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM6,000,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

For the Purpose of Supply B.03, Office of the State Secretary, a sum of RM6,000,000.00 is provided for the implementation of the Women and Family Affairs activities.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM18,000,000 for Head of Expenditure B.03, Office of the State Secretary, and RM11,500,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Tuan Mohd. Khuzzan bin Abu BakarPKR · PHChairman of the Committee on Youth, Sports and Culture · SemerahEN

An allocation of RM18,000,000.00 is provided under the Purpose of Supply B.03, Office of the State Secretary, for the Rakan Muda Programme and state sports activities.

Under the Purpose of Supply B.03, Office of the State Secretary, an allocation of RM11,500,000.00 is provided for the implementation of the Culture, Arts and Heritage activities of the State of Johor.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM3,431,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Honourable Member, Mr Chairman, an allocation totalling RM3,431,000.00 is provided under the Purpose of Supply B.03, Office of the State Secretary, for activities under the Johor Water Regulatory Body (BAKAJ).

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM1,976,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Honourable Member, Mr Chairman, for the Purpose of Supply B.03, Office of the State Secretary, a sum of RM1,976,000.00 is provided for management and administrative expenditure for Tourism Johor.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM1,395,000.00 for Head of Expenditure B.03, Office of the State Secretary, to become part of this Schedule.

Tuan Jimmy Puah Wee TsePKR · PHChairman of the Committee on International Trade, Investment and Utilities · Bukit BatuEN

Honourable Member, Mr Chairman, for the Purpose of Supply B.03, Office of the State Secretary, a sum of RM1,395,000.00 is provided for management and administrative expenditure for the Johor State Investment Centre (JSIC).

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM17,314,000.00 for Head of Expenditure B.04, State Treasury, to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Chairman, for the Purpose of Supply B.04, an allocation of RM17,314,000.00 is required for the management and administration of the State Treasury. Of this amount, RM6,135,000.00 is allocated for emoluments expenditure, RM2,941,000.00 for services and supplies expenditure, RM50,000.00 for acquisition of assets, RM188,000.00 for grants and fixed charges expenditure, and the balance of RM8,000,000.00 for revenue refunds and write-off expenditure.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

(Pause for the call to prayer.)

The matter before this Committee is the sum of RM20,223,000.00 for Head of Expenditure B.07, Department of Agriculture; RM72,707,000.00 for Head of Expenditure B.08, Department of Irrigation and Drainage; RM10,126,000.00 for Head of Expenditure B.10, Veterinary Services Department, to become part of this Schedule.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Honourable Member, Mr Chairman, under the Purpose of Supply B.07, Department of Agriculture, the allocation provided for the year 2019 totalling RM20,223,000.00 is to cover all administrative and management expenditure of the Agriculture Offices throughout the state, including emoluments of department members and other expenditure under the General Administration activity.

Under the Purpose of Supply B.08, Department of Irrigation and Drainage, the allocation required is a total of RM72,707,000.00. A sum of RM30,012,000.00 is provided for emoluments expenditure, RM41,900,000.00 is required for services and supplies, including the operation and maintenance of rivers, RM180,000.00 is provided for the acquisition of departmental assets, and RM615,000.00 is provided for grants and fixed charges, including payment in lieu of leave for retired department members.

Under the Purpose of Supply B.10, Veterinary Services Department, an allocation of RM10,126,000.00 is required for the administrative and management expenditure of the Veterinary Services Department, including staff emoluments, and for carrying out management tasks relating to animals and enhancing the development of the livestock industry throughout the state.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM7,030,000.00 for Head of Expenditure B.12, Royal Johor Flower Garden Office, to become part of this Schedule.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Honourable Member, Mr Chairman, for the Purpose of Supply B.12, an allocation totalling RM7,030,000.00 is provided for the management expenditure of the Royal Johor Flower Garden Office.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM4,687,000.00 for Head of Expenditure B.13, Town and Rural Planning Department, to become part of this Schedule.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Honourable Member, Mr Chairman, the allocation of RM4,687,000.00 under the Purpose of Supply B.13 is for the Town and Rural Planning Department to carry out tasks of controlling physical development, coordinating physical planning, and preparing local plans.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM15,637,000.00 for Head of Expenditure B.19, Forestry Department, to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Chairman, under the Purpose of Supply B.14, an allocation of RM15,637,000.00 is required for the management and administrative expenditure of the Forestry Department. Of this amount, RM13,146,000.00 is emoluments expenditure. The balance of RM2,491,000.00 is for other expenditure, including the department's services and supplies, assets, and grants and fixed charges.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM252,169,000.00 for Head of Expenditure B.21, Islamic Religious Department, to become part of this Schedule.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

For the Purpose of Supply B.21, Islamic Religious Department, an allocation of RM252,169,000.00 is required to carry out Islamic religious activities in efforts to enhance the propagation of Islam, including management expenditure under Islamic religious education. As well as assistance to Arabic schools and the Sekolah Agama Rakyat, KAFA. The allocation required for each activity is as follows:- Islamic Religious Department, namely general administration, RM58,690,000.00; Islamic religious education, RM193,479,000.00.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM26,986,000.00 for Head of Expenditure B.23, for the Department of Social Welfare, to become part of this Schedule.

Cik Liow Cai TungDAP · PHChairman of the Committee on Women's Development and Tourism · Johor JayaEN

Honourable Member, Mr Chairman, for the Purpose of Supply B.23, Department of Social Welfare, the allocation required for the year 2019 is a total of RM26,986,000.00. Of this amount, RM4,534,000.00 is required for the payment of emoluments to department members. RM2,280,000.00 is for services and supplies expenditure, RM167,000.00 is for acquisition of assets, and the balance of RM20,005,000.00 is for grants and fixed charges, which are welfare assistance and contributions to individuals and the community. This includes assistance to poor residents and disaster relief such as for floods.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM77,309,000.00 for Head of Expenditure B.24, Public Works Department, to become part of this Schedule.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Honourable Member, Mr Chairman, for the Purpose of Supply B.24, Public Works Department, the allocation required for the year 2019 is a total of RM77,309,000.00. Of this amount, RM54,430,000.00 is required for the payment of emoluments to department members, RM22,010,000.00 for services and supplies expenditure, RM220,000.00 for acquisition of assets, RM631,000.00 for expenditure on grants and fixed charges, while the balance of RM18,000.00 is required to cover other departmental expenditure. Thank you.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM4,265,000.00 for Head of Expenditure B.26, Royal Abu Bakar Museum, Istana Besar Johor; and RM630,000,000.00 for Head of Expenditure B.28, contribution to Statutory Funds, hereby to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Chairman, under the Purpose of Supply B.26, Royal Abu Bakar Museum, Istana Besar Johor, the allocation required is a total of RM4,265,000.00. Of this amount, RM2,525,000.00 is emoluments expenditure, while the balance of RM1,740,000.00 is for other expenditure, including the department's services and supplies, assets, and grants and fixed charges.

Under the Purpose of Supply B.28, an allocation of RM630,000,000.00 is required for contributions to Statutory Funds. The said amount is required as contributions to the Development Fund and the Housing Loan Fund.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM11,147,000.00 for Head of Expenditure B.29, for the Syariah Judicial Department; and RM2,031,000.00 for Head of Expenditure B.32, Mufti Department, to become part of this Schedule.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member, Mr Chairman, under the Purpose of Supply B.29, an allocation of RM11,147,000.00 is provided for the management and administrative expenditure of the Syariah Judicial Department for the year 2019. Of this amount, RM7,153,000.00 is provided for emoluments expenditure,

RM3,674,000.00 for services and supplies expenditure, RM205,000.00 for expenditure on acquisition of assets, and RM115,000.00 for expenditure on grants and fixed charges.

Under the Purpose of Supply B.32, an allocation of RM2,031,000.00 is provided for the management and administrative expenditure of the Mufti Department. Thank you.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is the sum of RM4,806,000.00 for Head of Expenditure B.41, Johor Bahru District Office; RM5,334,000.00 for Head of Expenditure B.42, Muar District Office; RM5,248,000.00 for Head of Expenditure B.43, Batu Pahat District Office; RM4,071,000.00 for Head of Expenditure B.44, Pontian District Office; RM4,819,000.00 for Head of Expenditure B.45, Segamat District Office; RM4,196,000.00 for Head of Expenditure B.46, Kluang District Office; RM4,952,000.00 for Head of Expenditure B.47, Kota Tinggi District Office; RM3,964,000.00 for Head of Expenditure B.48, Mersing District Office; RM3,550,000.00 for Head of Expenditure B.49, Kulai District Office; and RM3,240,000.00 for Head of Expenditure B.50, Tangkak District Office, hereby to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Speaker, under the Purpose of Supply B.41, Johor Bahru District Office, an allocation of RM4,806,000.00 is provided; under the Purpose of Supply B.42, Muar District Office, an allocation of RM5,334,000.00 is provided; under the Purpose of Supply B.43, Batu Pahat District Office, an allocation of RM5,248,000.00 is provided; under the Purpose of Supply B.44, Pontian District Office, an allocation of RM4,071,000.00 is provided; under the Purpose of Supply B.45, Segamat District Office, an allocation of RM4,819,000.00 is provided; under the Purpose of Supply B.46, Kluang District Office, an allocation of RM4,196,000.00 is provided; under the Purpose of Supply B.47, Kota Tinggi District Office, an allocation of RM4,952,000.00 is provided; under the Purpose of Supply B.48, Mersing District Office, an allocation of RM3,964,000.00 is provided; under the Purpose of Supply B.49, Kulai District Office, an allocation of RM3,550,000.00 is provided, and under the Purpose of Supply B.50, Tangkak District Office, an allocation of RM3,240,000.00 is provided; all these allocations are provided for the management and administrative expenditure of the District Offices throughout the State of Johor.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative.

The matter before this Committee is that the sum of RM24,815,000.00 for Head of Expenditure B.51, Land and Mines Office; RM6,221,000.00 for Head of Expenditure B.52, Johor Bahru District Land Office; RM5,353,000.00 for Head of Expenditure Muar Land Office; RM5,892,000.00 for Head of Expenditure B.54, Batu Pahat Land Office; RM3,521,000.00 for Head of Expenditure B.55, Pontian Land Office; RM4,802,000.00 for Head of Expenditure B.56, Segamat Land Office; RM4,514,000.00 for Head of Expenditure B. 57, Kluang Land Office; RM4,737,000.00 for Head of Expenditure B.58, Kota Tinggi Land Office; RM3,309,000.00 for Head of Expenditure B.59, Mersing Land Office; RM3,207,000.00 for Head of Expenditure B.60, Kulai Land Office; RM3,173,000.00 for Head of Expenditure B.61, Tangkak Land Office, to become part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Chairman, under the Purpose of Supply B.51, Land and Mines Office, an allocation of RM24,815,000.00 is provided. Under the Purpose of Supply B.52, Johor Bahru Land Office, an allocation of RM6,221,000.00 is provided. Under the Purpose of Supply B.53, Muar Land Office, an allocation of RM5,353,000.00 is provided. Under the Purpose of Supply B.54, Batu Pahat Land Office, an allocation of RM5,892,000.00 is provided. Under the Purpose of Supply B.55, Pontian Land Office, an allocation of RM3,521,000.00 is provided. Under the Purpose of Supply B.56, Segamat Land Office, an allocation of RM4,802,000.00 is provided. Under the Purpose of Supply B.57, Kluang Land Office, an allocation of RM4,514,000.00 is provided. Under the Purpose of Supply B.58, Kota Tinggi Land Office, an allocation of RM4,737,000.00 is provided, and under the Purpose of Supply B.59, Mersing Land Office, an allocation of RM3,309,000.00 is provided. Under the Purpose of Supply B.60, Kulai Land Office, an allocation of RM3,207,000.00 is provided, and under the Purpose of Supply B.61, Tangkak Land Office, an allocation of RM3,173,000.00 is provided. All these allocations are provided for the management and administrative expenditure of the Land Offices throughout the State of Johor.

ChairmanEN

The matter is put forward for a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is resolved in the affirmative. The Schedule shall form part of this Bill.

Clerk

FASAL 2

ChairmanEN

The matter before this Committee is that Clause 2 shall form part of this Bill. Honourable Members who agree, please raise your hands; those who do not agree, Clause 2 shall form part of this Bill.

First Clause

ChairmanEN

The matter before this Committee is that the First Clause shall form part of this Bill. Honourable Members who agree, please raise your hands; those who do not agree, the First Clause shall form part of this Bill.

The State Assembly resumed sitting.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, I wish to inform the House that this Bill has been considered in the Committee of the whole House, clause by clause, and agreed to without amendment. I therefore move that this Bill be read a third time and passed now.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Speaker, I second the motion.

SpeakerEN

The motion before this House is that the Bill entitled Enakmen Perbekalan (2019) Tahun 2018 be read a third time and passed now. The motion is put for a decision. Members who agree, please raise your hands; those who do not agree, the Bill is read a third time and passed.

ClerkEN

Be it enacted by the Johor State Legislative Assembly as follows: This Enactment may be cited as the Enakmen Perbekalan (2019) Tahun 2018 and shall come into operation on 1 January 2019.

Johor State Development Expenditure Estimates 2019.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, I move that this House immediately resolve itself into a Committee of the whole State Assembly to consider the Johor State Development Expenditure Estimates for 2019, which were tabled as Meeting Paper No. 21 of 2018, and to determine whether the estimates should be approved by this House with or without amendment.

The funds required for the Development Estimates for 2019 amount to RM600,000,000.00 under four (4) Committees as follows: The Johor State Committee on Natural Resources, Administration, Finance, Planning and Economic Development, RM405,000,000.00; the Johor State Committee on Islamic Religious Affairs and Education, RM60,000,000.00; the Johor State Committee on Public Works, Infrastructure and Transport, RM100,000,000.00; the Johor State Committee on Health, Environment and Agriculture, RM35,000,000.00.

Further explanation of these allocations will be given at the respective committee stage.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Members who agree, please raise your hands; those who do not agree, the motion is agreed to.

The House resolves itself into a Committee.

ChairmanEN

The matters before this Committee are the sums of RM185,000,000.00.00 for Expenditure Head P.70, Office of the Menteri Besar of Johor; RM126,000,000.00 for Expenditure Head P.71, Office of the State Secretary (Development); and RM94,000,000.00 for Expenditure Head P.72, Office of the State Secretary (Management), agreed.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Chairman, under Development Purpose 70, Office of the Menteri Besar of Johor, an allocation of RM185,000,000.00 is provided for the year 2019. Of this amount, RM121,000,000.00 is required for carrying out development work, including physical development, social development and minor works. RM14,000,000.00 is provided for land acquisition expenses for public amenity development projects, while the remaining RM50,000,000.00 is provided for special district projects throughout the state of Johor.

Under Development Purpose 71, Office of the State Secretary (Development), an allocation of RM126,000,000.00 is provided for the year 2019. RM18,490,000.00 is provided for economic and inclusive development projects. A sum of RM28,995,000.00 is allocated for housing and Local Government development projects.

Besides that, RM13,522,000.00 is provided for projects under agriculture and agro-based industry. For the development of human capital, family and community, a sum of RM6,200,000.00 is allocated. For the implementation of projects relating to forestry, Taman Negara and water resource management, a sum of RM21,213,000.00 is provided, while RM10,000,000.00 is provided for the development of science, technology and innovation. RM21,300,000.00 is provided for youth and sports development programmes. Finally, for the promotion of tourism activities in the state of Johor, an allocation of RM6,280,000.00 is provided.

Under Development Purpose 72, Office of the State Secretary (Management), an allocation of RM94,000,000.00 is provided for the year 2019. A sum of RM44,483,000.00 is provided for maintenance, repair and upgrading works for government quarters and state buildings, state government-owned buildings outside Johor, and government buildings in the state government administrative centre, Kota Iskandar, as well as Masjid Kota Iskandar. In addition, RM15,000,000.00 is provided for payments related to Kota Iskandar. A sum of RM19,044,000.00 is provided for the construction of state government buildings, RM14,000,000.00 is provided for minor works, and finally RM1,473,000.00 is provided for enforcement vehicles.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM60,000,000 for Expenditure Head P.73, Islamic Religious Department, is agreed to.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Chairman, under Development Purpose 73, Islamic Religious Department, an allocation of RM60,000,000.00 is provided for the year 2019. A sum of RM2,000,000.00 is provided for Pusat Islam Iskandar, Johor, and RM39,815,000.00 for the development of religious schools throughout the state of Johor as well as the Johor State Islamic Education Office. An allocation of RM3,720,000.00 is provided for enforcement vehicles and machinery, equipment for government mosques, implementation of planned works to build quarters for officers, religious teachers and staff of the Johor State Islamic Religious Department. A further allocation of RM2,960,000.00 is for equipment and facilities at the Royal Mausoleum and cemeteries. An allocation of RM11,505,000.00 is for the construction and beautification of congregational mosques, the buildings of the Johor State Islamic Religious Office and the buildings of the Johor State Syariah Court.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM100,000,000.00 for Expenditure Head P.74, Public Works Department, is agreed to.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Honourable Member Mr Chairman, under Development Purpose 74, Public Works Department, an allocation of RM100,000,000.00 is provided for the year 2019. A sum of RM53,000,000.00 is required for construction, upgrading and beautification of state roads and bridges, and RM2,000,000.00 for widening state roads, constructing riverbank walls and flood mitigation plans.

A sum of RM3,500,000.00 is also provided for upgrading mechanical and electrical systems in government buildings, and RM3,000,000.00 is allocated for other minor works. A sum of RM2,500,000.00 is provided for the construction, upgrading and renovation of government buildings in the state of Johor. For upgrading main government buildings and building facilities and requirements, a sum of RM8,000,000.00 is provided as an allocation.

A sum of RM24,500,000.00 is allocated for state buildings, while RM3,000,000.00 is for the building of Yayasan Warisan Johor. Finally, RM500,000.00 is provided for the purchase of vehicles and machinery. Thank you.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM35,000,000.00 for Expenditure Head P.75, Irrigation and Drainage Department, is agreed to.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Honourable Member Mr Chairman, for Development Purpose 75, Irrigation and Drainage Department, an allocation of RM35,000,000.00 is provided for the implementation of projects for the year 2019. Of this amount, RM1,300,000.00 is for the purchase of machinery, vehicles, plant and sluice gates, as well as equipment, and RM1,020,000.00 is provided for departmental buildings. RM660,000.00 is provided for survey and investigation projects for drainage and irrigation projects. In addition, RM23,130,000.00 is provided for the Flood Mitigation Plan, the Urban Drainage Plan, the Coastal Erosion Control Plan and the Management Plan, and finally RM8,890,000.00 is provided for the implementation of other drainage and irrigation projects throughout the state of Johor. Thank you.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Chairman, as the development purposes stated in Meeting Paper No. 21 of 2018 have now been fully considered, I move that the resolutions of the Committee be reported immediately to the State Assembly.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The State Assembly resumes its sitting.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, I wish to inform the House that this House's Committee has considered and approved, without amendment, the development purposes stated in Meeting Paper No. 21 of 2018. I therefore move that this House agree to the resolutions of the Committee, namely: - the sum of RM600,000,000.00 proposed for the Development Expenditure Estimates for 2019 be approved by this State Assembly.

And, accordingly, resolve that a sum not exceeding RM600,000,000.00 shall be spent from the Development Fund in the Financial Year 2019 to carry out the purposes stated in the said Meeting Paper.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Members who agree, please raise your hands; those who do not agree, the motion is agreed to.

Supplementary Appropriation (No. 2) Enactment Bill for Year 2018.Bill

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, I move that the Bill entitled Enakmen Perbekalan Tambahan (No.2) Tahun 2018 be read a first time.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Speaker, I second the motion.

SpeakerEN

This Bill is read a first time.

ClerkEN

An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure for services for the year 2018, and to appropriate that money for specific purposes.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, I wish to inform the House that I will move the motion for the second reading of this Bill today, and I move that Standing Order 112(2) be temporarily suspended so that the consideration of this Bill at its other stages may be completed today.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Speaker, I second the motion.

SpeakerEN

The motion is put for a decision. Members who agree, please raise your hands; those who do not agree, the motion is agreed to.

Standing Order 112(2) is temporarily suspended.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, I move that this Bill be read a second time now.

This Supplementary Allocation is the second supplementary allocation for Supply Expenditure for the year 2018. The supplementary allocation required is RM65,335,000.00 as provided in the Enakmen Perbekalan Tambahan under six (6) Committees as follows: The Johor State Committee on Natural Resources, Administration, Finance, Planning and Economic Development, RM49,190,000.00; the Johor State Committee on Islamic Religious Affairs and Education, RM6,242,000.00; the Johor State Committee on Housing and Rural Development, RM129,000.00; the Johor State Committee on Local Government, Science and Technology, RM2,675,000.00; the Johor State Committee on Public Works, Infrastructure and Transport, RM6,087,000.00; the Johor State Committee on Health, Environment and Agriculture, RM1,012,000.00.

Further explanation of these supplementary allocations will be given at the respective Committee stage.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member Mr Speaker, I second the motion.

SpeakerEN

The motion before this House is that this Bill be read a second time now.

Members who agree, please raise your hands; those who do not agree, this Bill is read a second time.

ClerkEN

An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure for services for the year 2018, and to appropriate that money for specific purposes.

The House resolves itself into a Committee.

Clerk

JADUAL.

ChairmanEN

The matters before this Committee, namely the sum of RM14,000.00 for Expenditure Head B.01, Public Service Commission; RM4,627,000.00 for Expenditure Head B.03, Office of the State Secretary, Management Division; RM4,703,000.00 for Expenditure Head B.03, Office of the State Secretary, Miscellaneous Services; RM72,000.00 for Expenditure Head B.03, State Economic Planning Unit; and RM75,000.00 for Expenditure Head B.03, Internal Audit shall form part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member Mr Speaker, under Supply Purpose B.01, the Johor State Public Service Commission is allocated RM14,000.00 to cover payments of Special Financial Assistance to the department's staff in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

Under Supply Purpose B.03, Office of the State Secretary of Johor, Management Division, an allocation of RM4,627,000.00 is provided. RM1,751,000.00 is required to cover emoluments and Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018, while the remaining RM2,876,000.00 is required to cover the department's communication and utility charges.

Under Supply Purpose B.03, Office of the State Secretary of Johor, Miscellaneous Services, an allocation of RM4,703,000.00 is provided. RM3,861,000.00 is required to cover the department's service and supply expenditure, while the remaining RM842,000.00 is required to cover expenditure on other capital assets of the department.

Under Supply Purpose B.03, State Economic Planning Unit of Johor, an allocation of RM72,000.00.00 is provided to cover Special Financial Assistance in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

Under Supply Purpose B.03, Internal Audit, an allocation of RM75,000.00 is provided to cover emoluments and Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matters before this Committee, namely the sum of RM2,299,000.00 for Expenditure Head B.03, Local Government Division; and RM184,000.00 for Expenditure Head B.03, Landscape Department shall form part of this Schedule.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Honourable Member Mr Chairman, under Supply Purpose B.03, Local Government, an allocation of RM2,299,000.00 is provided. RM60,000.00 is required to cover emoluments to the department's staff. RM319,000.00 is required to cover communication and utility expenses, while the remaining RM1,920,000.00 is required to cover payments of the Contribution to Assist Rates on State Government Properties.

Under Supply Purpose B.03, Landscape Department, an allocation of RM184,000.00 is provided to cover emoluments to the department's staff and Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM129,000.00 for Expenditure Head B.03, Housing shall form part of this Schedule.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Under Supply Purpose B.03, Housing, an allocation of RM129,000.00 is provided to cover Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM19,043,000.00 for Expenditure Head B.04, State Treasury shall form part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Under Supply Purpose B.04, Johor State Treasury Office, an allocation of RM19,043,000.00 is provided to cover expenditure on refunds of revenue and write-offs, including write-offs of losses involving expenditure.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matters before this Committee, namely the sum of RM786,000.00 for Expenditure Head B.08, Irrigation and Drainage Department; and RM226,000.00 for Expenditure Head B.10, Veterinary Services Department shall form part of this Schedule.

Tuan Dr. Sahruddin bin JamalBERSATU · PNChairman of the Committee on Health, Environment and Agriculture · Bukit KepongEN

Honourable Member Mr Chairman, under Supply Purpose B.08, Johor State Irrigation and Drainage Department, an allocation of RM786,000.00 is provided to cover Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

Under Supply Purpose B.10, Johor State Veterinary Services Department, an allocation of RM226,000.00 is provided to cover emoluments and Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM192,000.00 for Expenditure Head B.12, Johor Royal Flower Garden Office shall form part of this Schedule.

Tuan Tan Hong PinDAP · PHChairman of the Committee on Local Government, Science and Technology · SkudaiEN

Under Supply Purpose B.12, Johor Royal Flower Garden Office, an allocation of RM192,000.00 is provided. RM163,000.00 is required to cover Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018, while the remaining RM29,000.00 is required to cover payments in lieu of leave for staff of the department who have taken voluntary retirement.

ChairmanEN

The matter is put for a decision. Members who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM327,000.00 for Expenditure Head B.19, Forestry Department shall form part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Under Supply Purpose B.19, Johor State Forestry Department, an allocation of RM327,000.00 is provided. RM299,000.00 is required to cover emoluments and Special Financial Assistance payments in accordance with the Johor State Service Circular No. 1 of 2017 and No. 1 of 2018, while the remaining RM28,000.00 is required to cover payments in lieu of leave for staff of the department who have retired.

ChairmanEN

The matter before this Committee, namely the sum of RM5,542,000.00 for Expenditure Head B.21, Islamic Religious Department shall form part of this Schedule.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member, Mr Chairman, under Supply Item B.21, the Johor State Islamic Religious Department is allocated RM5,542,000.00. RM2,934,000.00 is allocated under the management component to cover emoluments for newly appointed staff, Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018, and departmental communication and utility expenses and payments in lieu of leave to staff who retire compulsorily, retire voluntarily, and who have passed away. The remaining RM2,608,000.00 is required for the Islamic Education Division to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff, as well as payments in lieu of leave to retired departmental staff and departmental contract staff. Thank you.

ChairmanEN

The matter is submitted for a decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee is the sum of RM6,087,0000.00 for Head of Expenditure B.24, Public Works Department, to form part of this Schedule.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Public Works, Infrastructure and Transport · Puteri WangsaEN

Honourable Member, Mr Chairman, under Supply Item B.24, the Johor State Public Works Department is allocated RM6,087,000.00. RM1,224,000.00 is required to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018. RM4,820,000.00 is required to cover rental expenses for official government functions, while the remaining RM43,000.00 is required to cover payments in lieu of leave to retired staff. Thank you.

ChairmanEN

The matter is submitted for a decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee, namely the sum of RM264,000.00 for Head of Expenditure B.26, Abu Bakar Royal Museum, Istana Besar Johor; and RM17,906,000.00 for Head of Expenditure B.28, contribution to the Statutory Fund, is to form part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Chairman, under Supply Item B.26, the Abu Bakar Royal Museum, Istana Besar Johor is allocated RM264,000.00. RM51,000.00 is required to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018. The remaining RM213,000.00 is required to cover utility payments at the Abu Bakar Royal Museum building, Istana Besar Johor.

Under Supply Item B.28, the contribution to the Statutory Fund is allocated RM17,906,000.00 to cover the realignment of the loan account of other statutory bodies for clean water usage payments and to the Public Utilities Board, Singapore.

ChairmanEN

The matter is submitted for a decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee is the sum of RM685,000.00 for Head of Expenditure B.29, Syariah Judiciary Department; and RM15,000.00 for Head of Expenditure B.32, Mufti Department, to form part of this Schedule.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member, Mr Chairman, under Supply Item B.29, the Syariah Judiciary Department is allocated RM685,000.00. RM314,000.00 is required to cover emoluments and Special Financial Aid payments under Johor State Service Circular Number 1

of 2017 and Number 1 of 2018. The remaining RM371,000.00 is required to cover departmental services and supplies expenses.

Under Supply Item B.32, the Mufti Department is allocated RM15,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff. Thank you.

ChairmanEN

The matter is submitted for a decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed to.

The matter before this Committee is the sum of RM425,000.00 for Head of Expenditure B.41, Johor Bahru District Office; RM50,000.00 for Head of Expenditure B.43, Batu Pahat District Office; RM160,000.00 for Head of Expenditure B.44, Pontian District Office; RM106,000.00 for Head of Expenditure B.45, Segamat District Office; RM34,000.00 for Head of Expenditure B.47, Kota Tinggi District Office; RM55,000.00 for Head of Expenditure B.49, Kulai District Office; and RM116,000.00 for Head of Expenditure B.52, Johor Bahru Land Office; RM102,000.00 for Head of Expenditure B.53, Muar Land Office; RM99,000.00 for Head of Expenditure B.54, Batu Pahat Land Office; RM59,000.00 for Head of Expenditure B.55, Pontian Land Office; RM329,000.00 for Head of Expenditure B.56, Segamat Land Office; RM346,000.00 for Head of Expenditure B.57, Kluang Land Office; RM78,000.00 for Head of Expenditure B.58, Kota Tinggi Land Office; RM85,000.00 for Head of Expenditure B.59, Mersing Land Office; RM60,000.00 for Head of Expenditure B.60, Kulai Land Office; and RM55,000.00 for Head of Expenditure B.61, Tangkak Land Office, is to form part of this Schedule.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Chairman, for Supply Item B.41, the Johor Bahru District Office is allocated RM425,000.00 to cover emoluments and Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.51, the Batu Pahat District Office is allocated RM50,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.44, the Pontian District Office is allocated RM160,000.00. RM105,000.00 is required to cover emoluments and Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff. The remaining RM55,000.000 is required to cover payments in lieu of leave to staff who retired voluntarily in 2018.

Under Supply Item B.45, the Segamat District Office is allocated RM106,000.00 to cover payments of fixed allowances to departmental staff following the upgrading of the Segamat District Council to the Segamat Municipal Council, and Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018.

Under Supply Item B.47, the Kota Tinggi District Office is allocated RM34,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.49, the Kulai District Office is allocated RM55,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.52, the Johor Bahru Land Office is allocated RM116,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.53, the Muar Land Office is allocated RM102,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.54, the Batu Pahat Land Office is allocated RM99,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.55, the Pontian Land Office is allocated RM59,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.56, the Segamat Land Office is allocated RM329,000.00 to cover emoluments to departmental staff, including the increase in fixed allowances following the upgrading of the Segamat District Council to the Segamat Municipal Council, and Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.57, the Kluang Land Office is allocated RM346,000.00 to cover emoluments and Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.58, the Kota Tinggi Land Office is allocated RM78,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.59, the Mersing Land Office is allocated RM85,000.00 to cover emoluments to three new departmental staff and Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018.

Under Supply Item B.60, the Kulai Land Office is allocated RM60,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

Under Supply Item B.61, the Tangkak Land Office is allocated RM55,000.00 to cover Special Financial Aid payments under Johor State Service Circular Number 1 of 2017 and Number 1 of 2018 to departmental staff.

ChairmanEN

The matter is submitted for a decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed to.

The Schedule forms part of this Bill.

Clerk

Fasal 2.

ChairmanEN

The matter before this Committee is that Clause 2 form part of this Bill. Those who agree, please raise your hands; those who do not agree, Clause 2 is agreed to form part of this Bill.

First Clause.

ChairmanEN

The matter before this Committee is that the First Clause form part of this Bill. Those who agree, please raise your hands; those who do not agree, the First Clause is agreed to form part of this Bill.

The State Assembly resumed.

Dato’ Haji Osman bin Haji SapianBERSATU · PHMenteri Besar · KempasEN

Honourable Member, Mr Speaker, I beg to inform the House that this Bill has been considered clause by clause in the Committee and agreed to without amendment, and I therefore move that this Bill be read a third time and passed now.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member, Mr Speaker, I second the motion.

SpeakerEN

The motion before this House is that the Bill entitled Enakmen Perbekalan Tambahan(No. 2) Tahun 2018 be read a third time and passed now. The motion is submitted for a decision.

Those who agree, please raise your hands; those who do not agree, this Bill is read a third time and passed.

ClerkEN

Be it hereby enacted by the Johor State Legislative Assembly as follows:- This Enactment may be cited as the Enakmen Perbekalan Tambahan (No. 2) Tahun 2018.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHChairman of the Committee on Islamic Religious Affairs and Education · Parit YaaniEN

Honourable Member, Mr Speaker, I beg to move that this House be adjourned.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHChairman of the Committee on Housing and Rural Development · Kota IskandarEN

Honourable Member, Mr Speaker, I second the motion.

SpeakerEN

Alhamdulillah, this sitting is now concluded. Thank you to all Members of the State Assembly, the Heads of Departments and all who were involved. If a needle breaks, do not keep it in the box; if there is error or fault, do not keep it in the heart. If you go out seeking a pole, please stop by our farm; if there is any wrong dealing, please forgive us all.

Honourable Members, I adjourn this sitting until a date to be fixed later.

Thus, wabillahi taufik walhidayah. Assalamualaikum warahmatullahi wabarakatuh.

The sitting was adjourned at 2.10 p.m.

Duty Officers:

SpeakerEN

Transcriber Miss Hajah Shubanah binti Yusuf

Assistant Transcriber Encik Hasnul Atmam bin Othman Puan Farrah Diana binti Mohammad

Head of House Unit Puan Norliza binti Md. Aris

Publication Assistants Puan Malina binti Mohd Nasir Puan Noraisah binti Mohd Yusof Encik Ariff bin Abu Bakar

Operations Assistants (Bentara) Encik Razine bin Sulaiman Encik Hamdan bin Markom Encik Norhayadi bin Hussien Encik Muhamad Khirunizam bin Pahmi Encik Mohd Norazri bin Kasim Encik Mohd Sapri bin Manan Encik Muhamad Khairul Asyraf bin Abdullah Encik Muhammad Khairul bin Arop

Office Secretaries (House Reporters) Puan Hajah Zalinah binti Ali Puan Hajah Saniah binti Kassim Puan Fareza binti Musa Puan Hajah Azlin binti Bahrin Puan Hajah Rumiah binti Semirono Puan Junaidah binti Paing Puan Siti Rojimah binti Abd. Razak Puan Norlydialina binti Ithnain Puan Norazilawati binti Masri Puan Noor Dalilah binti Dahalan Puan Zahiti binti Muhamad Hamdi Puan Shuriati binti Abdul Hajar Puan Hajah Haironisha binti Zainal Abidin Puan Norhafizah binti Osman Puan Raihanah binti Ismail Siti Rohani binti Ahmad Suhaimi

Recording Encik Nor Risam bin Esa Encik Azizan bin Md. Sidi

Video Audio Technician Encik Noorazhan bin Mohd Salleh