Announcement from the Honourable Speaker.
In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. (Recitation of salawat). Honourable Members, all praise be to God, we are able to continue the Third Meeting (Budget 2020) of the Second Session of the Fourteenth Johor State Legislative Assembly, on the sixth day, 28 November 2019.
Oral Questions.Questions
Honourable Pemanis, please.
Honourable Mr Speaker, Pemanis's question is question number 1.
With the greater freedom given to social media, many users have confused the meaning of hate speech with free speech. What steps will the government take to ensure this trend does not continue to the point of undermining the harmony and unity of the nation.
Please, Honourable EXCO member, 5 minutes.
In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Honourable Mr Speaker, and also Pemanis. For the information of the Honourable Members, the government is always committed to guaranteeing the freedom of expression of Malaysians based on Article 10 of the Federal Constitution. However, the government has received many complaints and views regarding the misuse of social media, as well as proposals to overcome these problems. The government is of the view that the freedom to discuss matters or news openly and transparently on social media must be maintained. But this must be done in a prudent manner and must not trigger any social problems, tension, or threaten the security of the nation.
This effort is not intended to curb freedom of expression but to maintain decency and to discourage views containing incitement and sensitive matters that may affect the security of the nation. The Ministry, through the Malaysian Communications and Multimedia Commission, in short SKMM, together with the Police, will not compromise and is always committed to taking firm action against any party that threatens the security, stability and harmony of the nation, which leads to racial, religious and royal institution polemics.
A special committee named the Jawatankuasa Jenayah Siber PDRM-MCMC (Cyber Crime Committee PDRM-MCMC) has been established with the aim of combating the threat of cybercrime more strategically and systematically. The committee, comprising the Commercial Crime Investigation Department of PDRM and SKMM, has the role of coordinating faster and integrated enforcement actions against any cybercrime in this state, especially when it involves sensitive issues such as 3R, with permission, (race, religion, royalty), race, religion and also royalty.
Types of cybercrime in this state also include Macau scam, online gambling, information theft, modification of computer programs or data, and hacking. Regarding reports received by SKMM involving 3R issues, SKMM has received a total of 21,296 pieces of information from the public on social media in the first 5 weeks since this special platform was established, the first 5 weeks since this special platform. The 3R content information list was created on 17 August 2019. The 3R platform allows Malaysians to provide information on the dissemination of content containing racial and religious incitement and insults to the royal institution for the common good.
Of the total information received by SKMM, 19,968 is still in the verification process, while 259 pieces of information received have been acted upon, including initiating investigations into the dissemination of information concerning reports of misuse and content takedown in cooperation with social media platform providers, as well as referring to other authorities for follow-up action. The period of follow-up action taken differs according to each case.
SKMM's examination found that 80% of the information received contained racially inflammatory content, while 20% related to religious issues. In related developments, SKMM, in cooperation with the Royal Malaysia Police, recently carried out raids at 14 locations in seven states, namely Kedah, Kuala Lumpur, Pahang, Perak, Selangor, Sabah and Sarawak. The statements of 14 suspects aged between 23 and 61 years have been recorded to assist the investigation of this case under Section 233 of the Communications and Multimedia Act 1998. If the suspects are found guilty, they may be fined a maximum of RM50,000.00 or imprisoned for one year, or both. That is all, Honourable Mr Speaker.
Yes, Pemanis, please.
Honourable Mr Speaker, Pemanis's supplementary question is: apart from legal action, does the government have education and prevention programmes, such as, to prevent social media from becoming a medium for hate speech? Thank you.
Honourable EXCO member, please.
Thank you, Pemanis, for the supplementary question. There are 2 education programmes implemented by SKMM, the first is called Klik Dengan Bijak (KDB) and the second is the Sebenarnya.my Programme. Klik Dengan Bijak refers to how SKMM educates the people to use social media prudently through the Klik Dengan Bijak programme, introduced in 2012. SKMM strives to instil the prudent use of the internet through 3 main pillars, namely safety, vigilance and responsibility, which emphasise self-regulation. Now the programme has reached almost 5 million people in our country.
The second is about the website Sebenarnya.my. The MCMC or SKMM has launched the Sebenarnya.my portal, which is a one-stop centre for Malaysians to check before sharing news of doubtful authenticity received online through social media platforms, instant messaging services, blogs, websites and others. Through this portal, ministries or government agencies will decide whether the news being spread has a basis and in terms of the authenticity of the news. And SKMM strongly encourages the public to use the Sebenarnya.my portal to find out the authenticity of news being spread on social media. That is all, Honourable Mr Speaker.
Yes, Panti, please.
In the name of Allah, the Most Compassionate, the Most Merciful. Thank you, Honourable Mr Speaker, Honourable EXCO member. I want to ask about, er, one issue. If we look at freedom of expression on social media, this may not be related to or not directly related to the issue or scope that was explained just now. About how much, perhaps people use social media, what is it, for example, like traders on social media. They use approaches that are sometimes not suitable with our norms here in Malaysia or with our religion. Using, what, obscene words, using, what, improperly dressed and so on. So, what is the state government's action, and secondly, how can we, or the society, if we come across these kinds of things, what can we do to help the government or the authorities to ensure these things do not spread on social media, thank you.
This question has gone a little off track, Honourable Member, it is up to the Honourable EXCO member.
Thank you for the supplementary question from Panti. Actually, the state government takes seriously what has been raised by Panti regarding the misuse of social media platforms by using improper expressions and the like. Access for the state government to take action, or the government, is by receiving police reports and also direct reports to SKMM. And SKMM provides several platforms, whether through email, whether through the website, and also through the WhatsApp group, and we can google directly to the SKMM website to obtain the route for gathering or making complaints.
From these complaints, the police or SKMM will actually channel them because of the various parties and also the acts related to the misconduct mentioned earlier, action can be taken. For example, using obscene materials, we have a separate act, including also the syariah offences act at the level of each state that we can use, and also if it contains scams or fraud, action can be taken under the criminal act and the like. What is important is that we as citizens give cooperation to the authorities to make official reports for follow-up action and subsequently prosecute those involved in such misconduct at the court action level. That is all, Honourable Mr Speaker.
The next question, Honourable Bukit Naning, please.
Honourable Mr Speaker, question number 2.
What security measures have been taken for the State Assembly portal to ensure there is no intrusion, as happened recently at the University of Malaya.
Please, Honourable EXCO member.
Assalamualaikum warahmatullah wabarakatuh. Thank you to the Honourable Mr Speaker. In answer to the question from Bukit Naning, what security measures have been taken for the State Assembly portal to ensure there is no intrusion, as happened recently at the University of Malaya. Firstly, the state government, through the Science, Technology and ICT Division, places great importance on cyber security involving ICT assets consisting of infrastructure, applications, data, system users and the government portal. As the agency responsible for government ICT assets, all ICT assets are protected as follows:
1. Installation of network security devices at government data centres. 2. Network user access control for all government offices. 3. Use of anti-virus software for computers supplied to users. 4. Use of the latest version of system development software. 5. Patching of system bugs in accordance with the recommendations of the Malaysian Cyber Security. 6. Periodic security testing of systems and portals.
7. Provision of duplicate copies or backups for all systems and portals. 8. Availability of a disaster recovery centre for critical government systems. 9. User-based access control, namely the domain controller. 10. System password control in accordance with the Johor ICT security policy.
That is all.
Jemput YB.
Thank you, Honourable EXCO member, for the answer given. Honourable Mr Speaker, my supplementary question is: how long would repairs take if there is a threat to the system? Thank you.
Please, Honourable EXCO member.
Thank you to Panti for the supplementary question. Firstly, the state government has a computer emergency response team led by the Government Chief Information Officer (CIO) to provide an immediate response should any ICT security incident occur. Repairs can be carried out depending on the level of damage that occurs. However, since 2010 there has never been any incident involving the state government's network and systems being hacked. Nevertheless, in the case of common technical disruptions such as server downtime, electrical faults, power supply problems or repair works to the building, either internal or external, these are common occurrences, and to overcome such disruptions the system repair testing period will take around 4 to 8 hours. That is all, thank you.
Next question, Honourable Perling, please.
Honourable Mr Speaker, my question is question 3.
State in detail each area size and the types of facilities provided by IRDA for the state's youth district?
Please, Honourable EXCO member.
Honourable Mr Speaker, Assalamualaikum warahmatullahi wabarakatuh, Honourable Members, Honourable Perling, for the question raised. The Iskandar Regional Development Authority, or IRDA, was established under Akta Parlimen 664 and acts as planner, facilitator and implementer for promotion programmes for the development of Iskandar Malaysia. IRDA works closely with federal departments and agencies and state agencies to ensure the implementation of programmes and initiatives, especially those that benefit the people, is carried out in a coordinated manner in an effort to ensure every level of society benefits from the development of this economic corridor. In this context, it must be reminded that each department and agency concerned has its own specific mandate and tasks in providing facilities for the local community, including for young people and youth. It is important that any proposals or provision of facilities, whether in physical form or in the form of soft enablers, with permission, such as human capital development assistance programmes, grants or incentives related to Iskandar Malaysia, do not overlap with each other or duplicate the roles carried out by other departments, so that every national or state resource can be spent optimally and efficiently. This is in line with the clear directives and message from the federal government and becomes the policy in any proposed budget allocation. In this regard, any initiative, programme or project, including facilities for youth implemented by IRDA itself, is usually a showcase project or pilot project for an idea or concept that has not yet been implemented, or for a project whose objectives cut across the functions of several other government departments. Among the programmes related to youth development that have been and are being carried out by IRDA itself are the following.
Firstly, the development of the Youth Hub, which covers 15 acres at Hutan Bandar MBJB and will be launched next year, which is a one-stop facility for youth to carry out physical activities and human capital development. The Youth Hub project at Hutan Bandar MBJB is a local hub project, and IRDA is developing a concept plan for a Regional International Hub covering 40 acres in the Iskandar Puteri area. A youth hub is a platform for the youth community to gather, exchange ideas and views, and organise activities such as recreation suited to the interests and modern tastes of the young generation.
Besides that, the initiative to establish the Iskandar Malaysia Village People Centre (IMPOD) is a platform for rural youth communities and to foster entrepreneurial interest in order to increase their income, as well as a place for any information on opportunities available through the development carried out in Iskandar Malaysia.
Another initiative by IRDA is the Iskandar Malaysia Youth Empowerment Fund (IMPOWER), a grant totalling RM3 million set aside to empower young people to implement programmes or initiatives that can improve the lives of the local community.
Another programme is the Johor Student Leaders Council (JSLC), a leadership programme to build positive icons among the youth and to make them a group of leaders who will lead Iskandar Malaysia with a high spirit and loyalty to the nation and to care for this state.
Next, the fifth, the Youth to Biz Programme, which is a grant totalling RM4 million to encourage youth participation in entrepreneurial activities, especially in the form of businesses with new and modern concepts.
Various talent development and leadership programmes (talent development upskilling and reskilling), with permission, for youth including fresh graduates, school leavers, young entrepreneurs and professionals, since 2008 until now have also been carried out by IRDA. It is estimated that about more than RM40 million has been spent to benefit our local youth.
I would also like to share that for some of these development programmes mentioned, youth participation is not only limited to those residing within the Iskandar Malaysia area but is also open to all youth in the state of Johor. Thank you.
Yes, Perling, please.
Based on the facilities the Honourable EXCO member mentioned earlier, is it also according to the Honourable EXCO member's portfolio how they can meet the needs of young people and youth, especially in the state of Johor?
Thank you. Please, Honourable EXCO member.
Thank you, Honourable Member for Perling. These young people are seen as the group that will become the catalysts and drivers of economic and social development in a country, a state, or within a race, and they are also, if I may say so, the second tier of leadership, or the national leadership successors in the future. So, if we look again at the question raised, how the initiatives I mentioned earlier can meet the needs of the youth group, I think there is no doubt that they will certainly help our young people to develop their potential as the successor generation to the state and to the country in the future. I would like to state here one of the main pillars of the sustainable development plan for the state of Johor, which has also been stated in this House before, which encompasses the idealistic aspirations of young people, taking into account the roles and inclinations of young people in activities to boost economic development in this state of Johor.
Therefore, the views and also the mapping of young people's interests are important for determining economic planning and the direction of the state. I would also like to share that, through my Youth portfolio, a series of Jelajah Exspresi community tours, or Jelajah EK, has been carried out in 10 districts in the state of Johor, and this survey has already been conducted through the tours I mentioned. And, a series of town halls has also been held during this tour series. Among the survey findings we obtained is that 68.7% of youths are of the view that their recreational or sports centres need to be upgraded or given improvements, followed by other smaller elements such as futsal courts, football fields, sports complexes and so on. This shows that there is a high need among youths to use recreational centres or sports centres among our young people. I am of the view that the establishment of a Youth Hub, and also the facilities provided, or those I mentioned in the first question earlier, are in line with meeting the needs voiced by young people and youths in our state. And, certainly, these facilities will benefit youths, in addition to the need for monitoring by the Local Authorities and also the Youth EXCO portfolio in the state government. Thank you.
The next question, Honourable Member for Kempas, please proceed.
Assalamualaikum warahmatullahi wabarakatuh, good morning and greetings of peace. My question is Question No. 4, Honourable Mr Speaker.
What is the total kilometres, cost and latest status of road widening projects, including the widening of Jalan Kempas Lama, Kampung Maju Jaya Kempas in the state of Johor, in the first nine months of 2019?
Please, Honourable EXCO.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Honourable Mr Speaker, the widening of Jalan Kempas Lama, Kampung Maju Jaya Kempas involves upgrading the existing alignment from 2 lanes two-way to 4 lanes two-way, along a length of 2.2 km. The current cost of this project is RM32,648,000.00 and it is expected to be completed on 2 February 2020. The latest status of this road, according to the physical progress schedule, is 92%, financial progress 78.28%, actual physical progress 60% and financial progress 29.08%. This means the project is delayed by 150 days. Honourable Mr Speaker, and to add a little on this delay, it occurred because of Land Acquisition (PBT), where the hearing has only just been concluded and Form K was received on 7 November 2019. Therefore, the planning of other works was slightly affected at the site.
Secondly, the relocation of TNB utility works, namely the cables, has not yet been received from the TNB supplier and Telekom Malaysia. Likewise, as a result, the contractor has applied for an extension of time and has been granted 106 days. The latest status is that they will sit to deliberate on the application for this extension on 25 Nov, the 25th of last month. On 25 November 2019. Thank you, Honourable Mr Speaker.
Please, Honourable Member for Kempas.
Thank you, Honourable Mr Speaker. As the Chairman of the Public Works Committee answered just now, the delay is 150 days, or 4 and a half months. This is not only a loss in terms of usability but also in terms of congestion, where various problems have arisen. I want to ask, apart from the actions and what was stated just now, what the next action is regarding this delay. Because I more or less know, this company took over from the earlier company that had been given the letter of award because the company's major shareholder passed away and the company continued to exist. Suddenly it changed to this company, which is not credible like this. That is why my question is why this happened in such a way and what drastic action must be taken, not merely allowing it to be extended and extended again. But the earlier method was already wrong, because malpractice was used. I ask, that is my question.
Please, Honourable EXCO. But the answer must be correct, EXCO. Otherwise there will be a second question.
Thank you, Honourable Speaker. Throughout Tenang's tenure as EXCO for JKR, indeed one of the problems we face is the performance of contractors. The performance of these contractors is contributed by several factors, among them contractors who lack credibility. This is an old history, so going forward Tenang and the authorities will ensure that only contractors who are experienced and have strong finances will be considered for projects, whether state or federal, and the usual action, or the action we can take, is to terminate the contractor concerned.
No, I mean the Kempas issue just now, what is the guarantee.
For this Kempas matter, I think we will look again at this contractor's performance in the near future, and I think, Tenang thinks, we need to take firm action if that can speed up the completion of the project concerned, thank you.
Tuan Speaker...
Only one question, Honourable Member.
The answer is not accurate, not accurate. It has been 7 months, surely action is only being taken now.
Honourable Mr Speaker, a point of order. The Honourable Member has already made a ruling, it must be firm.
Terima kasih.
If that becomes the practice, if they can do it on that side, it means I can also do it. Now let us upgrade our House.
Rengit is always like this, if we talk about Pak Sibuk, he is number one. I will give Pak Sibuk a medal.
This is not a matter of Rengit, not a matter of Kempas. This is the august House.
Ok, as I mentioned just now.
Once a ruling has been made, we must abide by our ruling, our rules.
Ok, thank you Rengit. Thank you Kempas. That is why I mentioned the Kempas issue earlier. I think some of it was answered just now, but perhaps if they are not satisfied, they can continue to contact Tenang after this. Ok, there is one.
Next, I invite Pemanis to proceed, please.
Honourable Mr Speaker, Question No. 5.
The effectiveness of the enforcement by JAS depends greatly on coordinated action by the PBT, TNB, SAJ, BAKAJ, including the offices of local Members of Parliament. What are the government's definitive actions to ensure cross-agency cooperation and the relevant parties in efforts to increase the effectiveness of JAS enforcement?
Please, Honourable EXCO.
Good morning, greetings of peace. Honourable Mr Speaker, in principle the issue of environmental management and enforcement falls under the Department of Environment. However, cross-sectoral pollution issues, with izin, covering air, water and toxic waste pollution, require the involvement of various relevant agencies such as the Local Authorities, Tenaga Nasional Berhad, the water company Ranhill SAJ Sdn. Bhd., the Johor Water Regulatory Body (BAKAJ), and the role of local leaders in supporting the functions of the Department of Environment.
Therefore, the Johor state government has established a Standing Committee on Environment comprising relevant agencies to coordinate action and enhance the enforcement of the Department of Environment. Through the Standing Committee on Environment, environmental pollution control activities will focus on 3 functional areas, namely water, air pollution control and waste management. In principle, this Standing Committee on Environment is established to comprehensively address pollution issues in the state of Johor through monitoring and enforcement of pollution sources in an integrated manner. The Standing Committee on Environment will also coordinate action between agencies through their respective jurisdictions so that integrated actions taken are planned and effective. Thank you.
Yes, please proceed, Pemanis.
Honourable Mr Speaker, my supplementary question is, apart from perhaps the transfer of laws or the integrated raids which Pemanis was informed are less effective because there is a leak of information before the action is carried out. So, can the state government act in drafting existing laws to ensure faster and more effective enforcement. Thank you.
Yes, please proceed, Honourable EXCO.
Indeed, the relevant agencies or departments under this committee, this Standing Committee on Environment, can take enforcement action according to their respective jurisdictions. But while we conduct operations, we will also hold discussions so that the operations we carry out are more effective, and regarding this information leak, we really need to have a method, how during the operation, the information regarding the operation to be carried out on that factory will not be leaked to certain parties so that the operation carried out is more effective.
How do we prevent that leak, Honourable Member?
Yes, that is it. We have certain methods, we have certain methods so that while conducting this information operation, we are more confident it will not be leaked to certain parties.
Next question, Honourable Member for Johor Lama, please.
Honourable Mr Speaker, Question No. 6.
Requesting an expedited supply of water from the Sungai Dohol to the Gembut Water Treatment Plant, to be channelled directly to the Waha Water Treatment Plant and the Lok Heng Water Treatment Plant by BAKAJ. Utilise the allocation provided for the study to resolve the water issue immediately.
Please, Honourable EXCO.
Honourable Mr Speaker. The El Nino phenomenon that has struck the state of Johor has caused the water level of the Sungai Gembut to decline and has caused the Sungai Gembut Water Treatment Plant to be unable to operate fully. To overcome this problem from continuing, I am pleased to inform the Honourable Member for Johor Lama and this august House that the Johor state government, through BAKAJ, has proposed and applied to the federal government, specifically the Ministry of Water, Land and Natural Resources (KATS), to implement the Raw Water Supply Project from Mawai Offtick through the Projek Layang 2 Phase 1, which will be implemented by the water supply division of KATS. This water source will be channelled from the Sungai Sedili Besar to the Sungai Gembut WTP at an estimated cost of RM40.77 million.
Honourable Mr Speaker, meanwhile, the water operator Ranhill SAJ will also upgrade the Gembut Water Treatment Plant and channel treated water from the Gembut Water Treatment Plant to the FELDA Gugusan Lok Heng area and also the FELDA Gugusan Waha. If the Raw Water Supply Project from Mawai Offtick to the Sungai Gembut WTP is implemented by the federal government. This will be able to overcome the problem of treated water supply in the stated areas during the dry season. However, for the initial step of this administration, we will carry out a feasibility study of the project, or feasibility study, based on the allocation approved amounting to RM500,000.00 by the Johor state government during the Third Meeting of the 2020 Budget for the Second Session of the 14th Johor State Legislative Assembly.
For the information of this august House, the components of the Raw Water Supply Project from the Sungai Sedili Besar to the Sungai Gembut Water Treatment Plant are as follows:
a. Involves the installation of water pipes with a diameter of 600 mm along a length of 25 kilometres. b. Construction of the intake structure, pump house building and main incoming substation. c. Costs for the study, consultant services, construction supervision, soil investigation, land acquisition and any related works.
With the implementation of these projects, the serious commitment of the Johor state government to try to resolve the water problem occurring in the FELDA Gugusan Lok Heng and also Waha areas is evident. Thank you.
Yes, Johor Lama, please. Supplementary question.
Thank you, Honourable Mr Speaker, and thank you for the answer given by the Honourable EXCO. I thank you very much for the plan made in the near future, and I think that in the 18 months since we came to power today, there are efforts, that is why I am very confident that a government needs planning or plans which are opposed by the other side. When the government makes a plan, it is disputed. When the government makes planning, it is disputed, because there are so many plans, but I want to draw attention to the fact that the previous government, did it not have any plans for local residents, when for decades they only thought of people other than the people of Kota Tinggi?
Question, the Honourable Member's question.
Just a moment, Honourable Chairman. The water in the Sungai Kota Tinggi is used for other districts and channelled to RAPID. So, because there was no planning, that is why the victims are the local people in the Lok Heng area, who have 30,000 users. So, my question, Honourable Chairman..
Apakah?
It is not about what, Honourable Chairman. That was yesterday, Honourable Chairman. My question is, when exactly will the implementation of the Gembut Water Supply Project be carried out so that I can answer the community that it is not just planning but implementation. Thank you, Honourable Speaker.
Thank you. Please, Honourable EXCO.
Thank you, Honourable Member for Johor Lama. And as I emphasised, the application has already been made to the Ministry of Water, Land and Natural Resources, and since this is the cost for the search for water sources and piping, the allocation comes from the federal government. For now I cannot give an exact date and final decision, but I give my promise to the Honourable Member for Johor Lama that we will follow up, and if there are any latest developments I will inform the Honourable Member directly. Thank you.
Next question, the Honourable Member for Pasir Raja, please.
Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, Question No. 7.
List all the latest welfare aid recipients in the Pasir Raja State Constituency, along with the type and amount of aid received by them each month from the Department of Social Welfare?
Please, the Honourable Member for Buluh Kasap.
Honourable Mr Speaker, my question No. 8.
Request that the government state the number of aid recipients from the Department of Social Welfare by race and gender for each district.
Please, Honourable EXCO.
Thank you, Honourable Mr Speaker. Based on the aid statistics of the Johor State Department of Social Welfare up to November 2019, the Department is handling 48,235 cases of financial aid recipients throughout the state of Johor. The Johor State Department of Social Welfare has also spent a total of RM14,903,250.00 per month to cover all of this aid. Of that total, 29,455 Malays, namely 13,268 males and 16,187 females, receive financial aid, and for the Chinese community there are 12,189 recipients, of whom 6,373 are male and 5,816 are female. For the Indian community, 2,128 are male and 3,216 are female, and for the category of other ethnicities, there are 600 males and 647 females. For the Pasir Raja State Constituency, up to October 2019, a total of 657 people are receiving JKM financial aid, with expenditure of RM221,750.00 each month. They receive financial aid through the Kota Tinggi District Social Welfare Office, and the breakdown of aid types, number of recipients and monthly aid amounts is as follows:
1. Disabled Workers Allowance Aid, the total number of recipients is 235 cases with a total aid of RM94,000.00. 2. Elderly Persons Aid, 186 cases with aid of RM65,100.00. 3. Non-Working Disabled Persons Aid, 128 cases with a total of RM32,000.00. 4. Aid for Care of Bedridden Disabled or Bedridden Chronic Patients, 37 cases with a total of RM12,950.00. 5. Child Aid, 64 cases, total RM12,800.00. 6. State General Aid, 7 cases, RM1,400.00.
Thank you.
Pasir Raja, please. Supplementary question.
Thank you to the Speaker. Thank you also to the EXCO for providing a clear answer. We know the poverty line income for JKM financial aid is RM900.00. Can JKM financial aid be considered if the recipient has a larger number of dependants. That is to say, perhaps many children or dependants on parents. So, can JKM consider if the recipient only earns RM900.00 or below, and how long is the waiting period for each application?
Yes, please proceed, Honourable EXCO.
Thank you, Mr Speaker. For the applicant that was just mentioned by Pasir Raja, namely whether the allocation can be increased. We do have a guideline, and if the applicant meets the requirements of the guideline and, for each category, has a maximum level, they will receive assistance up to that maximum level. As for how long it takes to approve an application for assistance, the approval period is in fact one month, in accordance with the client charter, provided all the documents are complete as required. That is all.
Yes, Buluh Kasap.
Thank you, the Honourable Mr Speaker. I would like to draw the attention of the Honourable EXCO. We have been informed that the number of recipients of the living allowance has decreased and the value has also decreased. So, does the Social Welfare Department (JKM) know, or has it obtained a survey, on whether the number of JKM aid recipients will increase next year? Thank you.
Please, the Honourable EXCO.
Thank you to Buluh Kasap. As for statistics, indeed the figures I have in hand show that the number of recipients has increased every year. So,
if there are new applicants, they may submit their applications to the JKM.
Next question. Please, the Honourable Tiram, go ahead.
Honourable Mr Speaker, question number 9.
The Senai to Desaru Highway E22 needs to have an exit slip road to Sungai Tiram. This highway does pass through Sungai Tiram. (Hentian Layang-Layang)
Please, the Honourable EXCO.
Thank you, the Honourable Mr Speaker. For the information of the Honourable Members, the planning and construction of an interchange is based on traffic projections. In general, the location of an interchange is between 20 and 40 kilometres apart, as stipulated in the Highway Concession Agreement. Interchange locations are built at strategic places based on traffic projections prepared by licensed consultants and endorsed by the Road Planning Division of the Ministry of Public Works (KKR). The Senai-Desaru Expressway has provided the Ulu Tiram Interchange and the Cahaya Baru Interchange, 18 kilometres apart, for the purpose of traffic movement between the Ulu Tiram and Cahaya Baru areas and the surrounding areas. The cost of constructing the expressway, including interchanges, and the operating and maintenance costs of the expressway are borne entirely by the concession company. These costs will be financed through toll collection on the traffic that uses the expressway. Accordingly, any proposal to build a new interchange requires a traffic study to ensure that it is viable. At present, there is still no proposal to build an interchange in the Sungai Tiram area, and such an interchange proposal may be considered by the federal government if there is a high and viable traffic need in that area. Thank you.
Yes, please, Tiram.
Supplementary question, Mr Speaker. Although this may not be under the EXCO's purview, may I know the name of the concession company? There are also complaints from the whole community that the tolls charged on the Senai to Desaru road are too high. I ask how this situation can be reduced, and I want to know the name of that concession. Thank you.
Jemput.
Thank you, Mr Speaker. I have a record of the company's name, but I could not find it. I will inform the Honourable Tiram. As for the reduction of costs, the rate or the toll rate is fixed in the concession. So, if there is an application, I think we can submit it to the government for consideration. Thank you.
Next question. The Honourable Sri Medan, please.
Peace be upon you, and the mercy and blessings of God. Honourable Mr Speaker, my question is number 10. Does the government have specific data on the existence of illegal factories, and how does the government deal with this matter together with other government agencies?
Please, the Honourable EXCO.
Thank you, the Honourable Sri Medan, for raising this question. For the information of this honourable House, the Local Authorities (PBT) do not have specific data on the existence of illegal factories within their administrative areas. However, the PBT's approach to dealing with illegal factories is by preparing a review of the Special Area Plan (RKK), industrial areas, and based on findings during monitoring, operations and whitening (pemutihan). Integrated operations can be carried out together with various parties, agencies and government departments, including the Department of Environment, SWCorp, the Land Office, the Royal Malaysia Police (PDRM), the Department of Occupational Safety and Health, and may also involve the Civil Defence Force (APM) and any government agency that has jurisdiction in dealing with these illegal factories and the existence of unlicensed factories. Unlicensed factories found will be given a warning notice, and then court action will be taken for carrying on business without a licence. That is all, thank you.
Honourable Mr Speaker. Supplementary question. Thank you to the Honourable EXCO for the answer, although my question, namely the total number of illegal factories in the state of Johor, could not be stated. What I want to ask here is whether the government, yes, I have also informed in my debate the other day, will plan a new guideline, a new mechanism or a new SOP that can be used by government departments or government agencies in dealing with the issue of illegal factories. Because we see at present, as I said in my debate, that even though the status of these factories is illegal, they are able to operate with water supply and electricity supply. This involves two main agencies, namely TNB and SAJ. Can the government create a new guideline for them to use? Thank you.
Please, the Honourable EXCO.
Thank you for the question raised by the Honourable Sri Medan. Indeed, if these factories are unlicensed or are declared illegal factories, it may be due to several factors. Perhaps these factories did not obtain approval from KM, or perhaps the land use conditions do not match, what-do-you-call-it, the operation of the factory. Thus, the factory, the PBT, can carry out whitening (pemutihan) under, what-do-you-call-it, Act 172, under Section 22(5), where the PBT can consider granting a KMT, Limited Planning Permission. And indeed, for a more concrete guideline to deal with the issue of illegal factories or unlicensed factories, my side is about to hold discussions with the relevant agencies so that there is a guideline on how to deal with, what-do-you-call-it, the issue of illegal factories, including perhaps carrying out whitening, so that factories that do not bring, what-do-you-call-it, environmental pollution issues to the environment may perhaps be considered for a KMT, because perhaps only because the land use does not meet the actual conditions. And this is something the PBT can consider. That is all, thank you.
Yes, Senggarang, please.
Thank you, Mr Speaker, my supplementary question is, how are these illegal factories standing on land, not on air, near the villages. So, this has existed for a long time, right, it has existed for a long time, and I have a major problem when this matter is raised by the people in the village. But when it is brought to the District Action Meeting, the matter goes back again, yes. So, how could this matter arise, yes, how long, from the past until now, in which there has been no action, yes. And is there a weakness on one side, right, on the government's side itself? My question, thank you.
Please, the Honourable EXCO.
The Honourable Senggarang, indeed we acknowledge that sometimes factories, what-do-you-call-it, factories operating without a licence, this is when we, the PBT or the relevant parties, are carrying out operations, only then do they discover that the factory does not have, what-do-you-call-it, a licence. Or it does not have, what-do-you-call-it, a certain permit from the relevant authority. So this also creates problems, but basically we need to see what the actual reasons are for why they did not obtain the relevant licence from the PBT. We need to know what the basis is, and from that we can, what-do-you-call-it, outline more concrete steps or perhaps a better guideline to deal with this issue.
Next question, the Honourable Mahkota, please.
Thank you, the Honourable Mr Speaker, question number 11.
How can the government help Bumiputeras to be given quotas to do business in the main commercial business centres in the cities?
Please, the Honourable EXCO.
Honourable Mr Speaker, to answer the question raised by Mahkota: how can the government help Bumiputeras to be given quotas to do business in the main commercial business centres in the cities? Basically, or in general, the government does not give or set any quotas for privately owned commercial business premises. However, for the information of the Honourable Member, until now the state government, through Johor Entrepreneur Corporation Sdn. Bhd. (PUJB), is committed to efforts to develop entrepreneurs so that they are given the opportunity to compete and continue to grow.
We can see the programmes that have been carried out by the GLCs in Johor to give Bumiputera entrepreneurs the opportunity to improve their own potential. For example, locations such as Pekan Rabu and so on are main commercial centres managed by PUJB, and there are also other commercial centres managed by GLCs, aimed at welcoming Bumiputera entrepreneurs to do business in both of the business centres I have just mentioned. In addition, among the entrepreneurs who have previously received assistance from the state government is, if I may mention it in this honourable House, Jeiwa, an NGO that has greatly helped women entrepreneurs, especially at the state level in Johor. From the information we have received, Jeiwa has now succeeded in placing one of its outlets, known as Jeiwa Power House, at Paradigm Mall, Johor Bahru, and among the products sold by women entrepreneurs in particular are food, biscuits, frozen food, cakes, clothing and also handicrafts.
Honourable Mr Speaker, besides that, among the state government's efforts to place Bumiputera entrepreneurs in the cities is by creating various spaces, among them the establishment of the B5 Johor Street Market. I believe that the strategic location in the central areas of Johor Bahru can increase the sales revenue of Bumiputera entrepreneurs in the state of Johor. Among the business fields of the entrepreneurs who trade at the B5 Johor Street Market are in the context of food, clothing, food truck entrepreneurs, with permission, and many others. Certainly, a strategic location like this can attract visitors and at the same time serve as a new identity for the state of Johor in the entrepreneurship sector. Thank you.
Yes, Paloh, Panti, sorry.
Thank you, the Honourable Mr Speaker, thank you for the answer from the Honourable EXCO. As the Honourable EXCO said earlier, there are many operators of these commercial centres, some from the government, from GLCs and also some from private companies. I want to draw the attention of the Honourable EXCO to operators, especially those from the private sector. Sometimes, what, the way they, what, manage and treat entrepreneurs, especially sometimes they do not follow the proper procedures or practices, what is correct. For example, sometimes they move premises as they please, or raise prices as they please when a tenant is seen to have potential, and so on. But my question is, how can the government, in particular, help these traders, regardless of whether they are Bumiputera or non-Bumiputera, against these commercial centre operators in terms of legal services or advice on agreements and so on, so that we can protect them if undesirable matters occur? Thank you.
Please, the Honourable EXCO.
Thank you, Panti, for the supplementary question. Listen, I think at the level of state entrepreneurship development in Johor, as I am quite confident, and Panti is also well aware and very knowledgeable, that the Johor Entrepreneur Development Corporation is the secretariat to the Johor State Entrepreneur Development Council, which consists of about 50 agencies directly involved in entrepreneurship activities. However, until today, specifically legal services or guidance on matters relating to law and so on involving these entrepreneurs have not yet been provided in a specific way. So, I consider that the issue raised by Panti is an important matter to be referred back to the EXCO for Youth, Sports and Entrepreneurship, so that, God willing, we will take appropriate action on the matter raised just now. I thank Panti for the question and also, I think, for the suggestion put forward in the question just now. Thank you.
Next question, I am invited to speak, Penggaram.
Honourable Mr Speaker, question number 12.
Penggaram is the town centre of Batu Pahat, where communication facilities are very much needed. Unfortunately, disruptions to telecommunication services are still continuing until now, and have affected the community. What steps and assurances does the government have to ensure this problem can be resolved immediately?
Please, the Honourable EXCO. Please, the Honourable EXCO, the Honourable Zul, please. Usually it is by 10.00, yes, and now it is already 11.00.
Mr Speaker, I ask for leave to pass the floor after this. I want to extract, the answer will come later, I am afraid it will waste the time of this honourable House.
Ok, I will go on to the next one first, and then we will come back. The Honourable Mengkibol, please.
Honourable Mr Speaker, my question is number 13.
The Schedule of Rates issued by the JKR, which serves as a reference in preparing Bills of Quantities (BQ), is often much higher than the current market price. Is this JKH only a reference price, or must it be followed even though the price is too high and unreasonable?
Please, the Honourable EXCO.
Thank you, the Honourable Mr Speaker. Mr Speaker, Mengkibol is among the state assemblymen who are very concerned about projects and the allocations spent by the government so that they can be saved, and that is a philosophy we emphasise in Pakatan Harapan. The Honourable Member's question concerns why, when compared, projects obtained from the government by small contractors are expensive compared with when the recipient engages or appoints their own contractor, such as the house builder in front of their house or at the shop, in that town, and his question is what drives small contractors to reach their price. If big contractors submit quotations and tenders, they compete, but for small contractors the award has its own guidelines, because the projects are small, Mr Speaker.
The JKR uses various publications, information and costs as references, depending on whether the project is large or small. Some of them are:
a. The Schedule of Rates for Civil and Building Engineering Works 2016 is used to calculate costs for works by direct purchase, namely works under RM50,000.00, or quotation works between RM50,000.00 and RM500,000.00. The rates include labour costs, material costs, plant rental costs, management costs, and the profit of the contractor. When profit is mentioned, there are times when it is implied that contractors make profits of up to 30%, so if a project worth RM10,000.00 is taken by a contractor at 30%, the recipient gets less value than if the recipient appointed a contractor in front of their house or in the town they know.
Second, the guidance mentioned earlier is the bulletin on the average monthly cost per square metre for building construction works, publication 12015, which is also among the information taken into account in setting prices.
c. Schedule of Rates for Small Works and Repairs 2014, d. Schedule of Rates for Building Works Based on Drawings and Specifications 2015, e. Schedule of Rates for Site Investigation 2012, f. JKR Building Cost Information Guide 2/2018.
In addition, the JKR also uses systems provided by the JKR headquarters' valuers, such as RATOL or Rate On Line, the PCE Premo System or Limenary Lost Estimate Prediction Model, and also the portal Public Work Lost Information Centre (PWCIC). All these references are analysed, and the data taken are from actual examples and references to current tenders. So, indeed that is the reference made by the JKR for works, especially small works. So, sometimes we also have to take into account various factors for small contractors who obtain works under RM20,000.00, which are sometimes seen as having rather high profits, but we set the price offered based on several very reasonable references. Thank you.
Jemput Mengkibol.
Thank you, Mr Speaker. Thank you to the Honourable EXCO for the understanding that we always want to maximise the value of our projects for the benefit of the people. In my constituency there are several cases like this, where a contractor has already been appointed but, although the district office that administers these projects and issues the BQ always tries to ensure they obtain sufficient profit, for example 30% or more, there are still
contractors who return the appointment until the project cannot be carried out. My supplementary question is, what effective action can we take, or what policy can we improve, with your permission, to ensure that these projects, or the contractors who repeatedly return appointments without strong reasons, can be blacklisted? That is all, thank you.
Please, Honourable EXCO.
Thank you, Mengkibol. I have been given the opportunity to answer this, and I want to promote a GLC, JCCD. JCCD was established by the government to help contractors in terms of quality improvement, financial provision and management, and this is where, if we implement mandatory registration next year, contractors will be trained by us and given some assistance so that they can carry out work with sufficient efficiency. However, regarding what action should be taken against small contractors who return work, that is left to the management or the controller of the contractor concerned. In this case, the district officer or the district JD may use their discretion to ensure that, most importantly, the project can be carried out properly. Thank you.
Yes, Benut, please.
Thank you, Honourable Mr Speaker. It is unfortunate for us if contracts offered by the government to contractors are returned, because the common perception or situation is that contracts prepared by this government are usually higher than private contracts. So, the issue for the Honourable Member is that the schedule of rates used by this government, compared with the schedule of rates used by the private sector, differs, and generally the private schedule of rates is lower than the one used by the government. So, when the contract is returned, that is why I say it is unfortunate, because the price should be better compared with private contracts. Therefore, what efforts is the government making to avoid this negative perception, that the government's prices do not follow current rates and its rates are not competitive like the contracts offered by the private sector, so that the difference and the perception are addressed, so that the government's image is not regarded as giving excessive opportunities to contractors? Thank you.
Please, Honourable EXCO.
Thank you, the Honourable Mr Speaker. There are thousands of contractors in the state of Johor, Mr Speaker. But apart from JCCD, there is not yet any agency that will organise or supervise them. So previously, there was no specific agency that managed them, although their numbers are large. This JKR EXCO manages projects, it does not manage contractors. If the JKR EXCO were to manage contractors, it would look rather messy later on. We want to manage contractors and projects together. So, in this case, regarding the perception that projects carried out by government contractors are expensive, this is indeed how we explain it to the recipients or to the ADUNs, so from time to time I will clarify, and especially here is where the role of JCCD comes in, to ensure this problem is not completely overcome but can be reduced. Thank you.
I return to the question 12 earlier. Honourable Penggaram, please.
Honourable Mr Speaker, question number 12.
Penggaram is the town centre of the Batu Pahat district, where communication facilities are very much needed. Unfortunately, the Telekom service disruption is still ongoing until now,
and it has affected the community. What steps and assurances does the government have to ensure this problem can be resolved immediately?
Please, Honourable EXCO.
Thank you, Honourable Mr Speaker, and thank you, Penggaram. I apologise, Honourable Mr Speaker, I had prepared earlier for question 15. Honourable Mr Speaker, according to information from Telekom Malaysia, several areas in Batu Pahat, Johor have experienced service disruptions due to severe damage to the main cable. Among the affected areas are Taman Pantai, Minyak Beku, Taman Ampuan, Taman Joseph, Taman Sri Pantai, Taman Batu Pahat, Taman Maju, Taman Makmur, Taman Soga, Taman Emas, Parit Kangkung, Kampung Petani, Taman Banang Ria, Taman Banang Height, Taman Wira, Taman Damai, Parit Lapis Darat and also Parit Gantung.
For the information of the Honourable Members, the TM service disruption problem in Batu Pahat has been successfully resolved through upgrading measures, from copper infrastructure to fibre, and the project was fully completed on 30 October 2019. At present, TM is in the stage of migrating customers in the areas involved in this upgrading process. TM also hopes to obtain the cooperation of the residents involved to smooth the process of upgrading from copper connections to unify, namely fibre. That is all, Honourable Mr Speaker.
Yes, please, Penggaram.
Thank you to the EXCO for that answer. I heard from the EXCO that almost the whole of Batu Pahat town, the town of Penggaram, has been involved in the disruption of the line. So now, what if Telekom customers who do not have internet subscriptions also have their lines disrupted? What alternative measures are there so that their lines can be restored, and I also want to ask whether TM is prepared to build a new network, because the businesses of traders in Batu Pahat have been affected.
Please, Honourable EXCO.
Thank you for the supplementary question from Penggaram. What I have been informed by Telekom Malaysia now is that they are at the stage of obtaining the cooperation of the owners or residents in Batu Pahat, and this process will take a little time. As for what was mentioned earlier about disruption to non-unify lines, there is still disruption. I will take note of this matter and I will give a written answer after this.
The next question, Honourable Benut, please.
Honourable Mr Speaker, my question number 14.
Please state, of the total Foreign Direct Investment (FDI) successfully attracted last year, how many of them offered skilled and high-technology jobs to the people of Johor?
Please, Honourable EXCO.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker. To answer the question from Benut, which also asked to state, of the total Foreign Direct Investment (FDI) successfully attracted last year, how many
of them offered skilled and high-technology jobs to the people of Johor. Based on information from InvestJohor in 2018, the value of investment approved in the manufacturing sector in Johor totalled RM30.51 billion ringgit, which includes domestic investment totalling RM6.47 billion. FDI investment totalled RM24.04 billion. With the addition of new investments and expansion of operations, more than 10,000 jobs are needed in manufacturing operations involving various economic sectors. The positions offered cover the categories of technical management, supervisors, technicians, marketing, and machine and equipment operation. As an example of the question of how many Johoreans are involved in high-skilled fields, for instance during my visit two weeks ago to Medini 7, I saw up close the developments related to this new technology, namely a company called i2M Ventures Sdn. Bhd. Under the GBS Iskandar Programme, which has shown an achievement in new technology fields where the related areas require degree qualifications in software development expertise, large-skill software development, blockchain, Java, AI and other IT skills, including finance and accountancy. Among Johor's children working there in these related fields, there are 1,456 persons, namely 64%. The projection, God willing, is that there are further projections for the next 3 years. That is all, thank you.
Ya, jemput.
Honourable Mr Speaker. Thank you, Honourable Member, for the explanation given. However, we are well aware that jobs with high technology and high skills are constantly increasing from time to time, with many graduates emerging every year. So, based on the government's plan to meet this need, does the Honourable Member have any idea of how much investment we expect in order to meet market needs or demand? Or, from the angle of the Honourable Member's target based on the KPIs introduced by the Investment EXCO, which will be able to offer high-skilled jobs?
Please, Honourable EXCO.
Thank you to Benut for the supplementary question. As I mentioned earlier, since it is located at Medini 7, it means it is not far from where we are sitting today. And, praise be to God, as I mentioned earlier, the number of its workers or staff from Johor alone is already 64%, and the projection for the next 3 years, God willing, will add another 6,500 projected [jobs]. This is just one company related to blockchain, and as I said earlier. For the information of this august House too, its minimum starting salary is RM2,500.00 and the highest is RM11,000.00. So, this shows that expertise in the IT field, in this high-expertise field, requires those who have received training, and most of them come from universities around us, namely UTM, which contributes the most, UTHM is also involved, including from KPYPJ. That is all, thank you.
Yes, Mengkibol, please.
Thank you, Mr Speaker. Skilled or high-technology jobs are always associated with high-technology companies or investments. My question is, this is perhaps suitable for EXCO Jimmy: what is our strategy to attract investment, whether from domestic companies or from abroad, that is technology-based, such as Unicorns and so on, to provide more high-technology opportunities? Thank you. .
This is a job for the Honourable Member. As for employment, it is up to the Honourable EXCO.
As I mentioned earlier, God willing. Actually, related to the KPI of foreign investment, we can see that apart from the types related to the sectors I mentioned earlier, it also includes the services sector, where this services sector relates to healthcare, hospitality, tourism and support services, and in this field too we need no less than about 6,000 workers in the services sector. So, I am confident and believe that if we are talking about high skills, we really need much more foreign, foreign investment to come in. So, whether we like it or not, we will work to seek funds from overseas. That is all, thank you.
Next, the Honourable Senai. The next question, please.
Thank you, Speaker, my question 15.
What are the developments in improving Unifi coverage in every district?
Please, Honourable EXCO.
Thank you, Honourable Speaker, and also to Senai for the question. Honourable Speaker and Honourable Members. For the Honourable Member's information, TM is implementing several stages to expand Unifi coverage throughout the state of Johor. Among the areas currently being planned for Unifi coverage are the districts of Mersing, Segamat and also Pontian. For the process of improving coverage across all districts, in the future TM is planning to expand its fibre optic network in stages starting from 2020. That is all, Honourable Speaker.
Senai, jemput.
Supplementary question, thank you for the EXCO's answer. My supplementary question is, for Unifi coverage, will we proceed directly with a study, or will we switch to expanding 5G, starting a study on 5G?
Please, Honourable EXCO.
Thank you for the supplementary question. As I have explained in this august House before, at the federal government level we have a five-year plan known as Gentian Optik dan Kesalinghubungan Negara or The National Fiberisation dan Connectiviti Plan, which runs from 2019 until 2023. Among the purposes of this initiative is to provide basic infrastructure for 5G services, and this will be extended to all telco operators by 2023, and also at the level of several state capitals starting in 2021, with internet speeds at a rate of 500 megabytes per second. That is all, Honourable Mr Speaker.
The next question, Honourable Senggarang.
Honourable Mr Speaker. My question number 16.
Please provide statistics on the total number of drug addicts across the whole state of Johor to date, and what serious action the government is taking to overcome this problem.
Please, Honourable EXCO.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace, Honourable Mr Speaker. For the information of the Honourable Senggarang and all Members of the House, in 2018 the number of drug addicts and drug users in the state of Johor was 12,313 persons, out of a total of 130,788 drug addicts and drug users nationwide. This figure is the fourth highest after the states of Pahang, Kelantan and Selangor. According to MyAADK statistics from 31 October 2017 to 31 October 2019, a total of 4,625 persons have been placed under the supervision of AADK Johor, known as Orang Kena Pengawasan (OKP). The Ministry of Home Affairs (KDN) through the National Anti-Drugs Agency (AADK) actively implements prevention, treatment and rehabilitation activities, as well as enforcement, for all levels of society throughout the country, including in the state of Johor. The implementation of the Prevention Education Programme, involving the community, other government departments and Non-Governmental Organisations (NGOs), is carried out through various approaches, including the Drug-Free Family Programme, the Drug-Free Educational Institution Programme, the Drug-Free Workplace Programme and the Drug-Free Community Programme.
The government, through AADK, has also introduced a Pilot Project to eradicate drug abuse in an integrated manner in 12 high-risk areas throughout the country, which also involves 2 districts in the state of Johor, namely the areas of Johor Bahru, Perling involving the areas of Perling, Tampoi, Skudai and Parit Sulong involving Batu Pahat. The Pilot Project also involves the cooperation of 9 ministries, 15 agencies and NGOs, where actions are implemented holistically involving all parties. AADK also provides treatment, medical and rehabilitation services to drug addicts through 2 approaches, namely Community-Based Rehabilitation (PDK) and Institution-Based Rehabilitation, where there are 30 Narcotic Addiction Rehabilitation Centres (PUSPEN) throughout the country. In Johor, there are 3 institutions, namely PUSPEN Kota Tinggi, Muar and Tampoi. Clients undergoing these treatment and rehabilitation programmes follow various programmes and activities that can help the clients' rehabilitation process in terms of psychological, spiritual and resilience of identity, to ensure that they remain free from drugs. KDN through AADK has also established strategic cooperation with the Ministry of Health Malaysia through the Harm Reduction Programme and the Substitution Therapy Treatment Programme. The Harm Reduction Programme is a comprehensive approach to reduce the negative effects on health, social and economic aspects resulting from drug abuse on individuals, especially among hardcore addicts, namely those who relapse repeatedly.
In order to expand the scope of authority and empower AADK in line with its important role in eradicating drug abuse, the Ministry of Home Affairs has also taken the following actions:
1. Studying an amendment to the Drug Dependants (Treatment and Rehabilitation) Act 1983. To improve the implementation of the Treatment and Rehabilitation Programme for drug abuse and to strengthen control over Private Rehabilitation Centres, PPDP and private clinics so that they comply with the minimum standards that have been set.
2. Proposing the Psychoactive Substances Bill (Rang Undang-Undang Bahan Khayal), namely Treatment and Rehabilitation 2019, to treat those who abuse psychoactive substances. The main area of AADK in enforcement activities is to trace inactive OKP clients and track those who, if found guilty of an offence, may be punished under Section 6 (3) of the Drug Dependants Act 1983 for breaching the supervision conditions ordered by the court. In addition, other enforcement activities are carried out, such as operations against complaints related to drug abuse submitted by the public. Ops Cegah, implemented by the AADK Enforcement and Security Unit, is intended to detain any individual suspected of drug addiction under Section 3 (1) of the Drug Dependants (Treatment and Rehabilitation) Act 1983. These arrests are carried out to help drug abusers and addicts obtain treatment and rehabilitation in Rehabilitation Centres or the Community.
Already 5 minutes, Honourable Member.
Yes, just a little more. The establishment of the AADK Hotline Movement Centre, operating 24 hours at the line 019-6262233 or 03-89112233, is to improve the quality and services of AADK in handling public complaints related to drug abuse, as well as providing information and advice on treatment and AADK facilities. Any complaints related to drug abuse may be made through the mediums above, to ensure the well-being and sustainability of the people are achieved. The government is always working together to ensure that the problem of drug abuse in the community in the state of Johor can be reduced, with the commitment of all parties. That is all, thank you.
I believe the time is now 11.00 a.m. I will conclude the oral questions this morning.
Honourable Mr Speaker.
Ya Stulang.
Standing Order 45 (13). Layang-Layang said yesterday that he did not know the Speaker's decision to withdraw the word munafik. So, I would like clarification from the Speaker: has Layang-Layang withdrawn that word, or is he willing to withdraw it? Thank you.
Ok, from the draft handset dated the 26th of this month, Tuesday, Layang-Layang mentioned on page 31, I respect that the Honourable Speaker has made a ruling yesterday, but if you want me to withdraw the statement munafik, fulfil those promises. So, this means that from this statement, the withdrawal is conditional, he has not withdrawn it, meaning. He is conditional. And I have explained that the period has not yet ended, because the period stated by Layang-Layang of 2 years has passed but was not fulfilled. But I have said that the period is 5 years. So, the conclusion from this Hansard is, Layang-Layang has not yet withdrawn the statement that the Pakatan Harapan government is a munafik government. So, I, as in my previous statement, it is appropriate that Layang-Layang withdraw the statement regarding the Pakatan Harapan government being a munafik government. I ask that Layang-Layang be given an opportunity.
Honourable Mr Speaker,
Just a moment, Honourable Speaker, I see page 35, yes, in the same Hansard. Page 35, firstly, I did not say that I did not know what the Speaker said. I said, refer back to the Hansard so we can read it together, don't make up stories, Honourable Member. Firstly, that is the first point. Secondly, with permission, I want to read page 35. I maintain the decision that vulgar words cannot be said in the House, that is final. Yes, no matter who it is, after this this ruling is made for our attention from now on, so that we, from now on, do not repeat that matter. We are Johoreans, full of decorum, I am proud of all Members. From now on. So, why change the ruling now, Honourable Speaker? This is here. Black and white. And to say the promises are fulfilled within 5 years, my promise, I print this out. The manifesto promise, 10 promises in 100 days, not 5 years, Honourable Speaker. If you cannot see this, please print it. I can give it to the Honourable Member.
May I ask Layang-Layang to sit down first, yes. Page 30 in the Hansard of the 25th of the month, I have said it there, yes, I read it again. I ask,
page 30, yes, I ask Layang-Layang to withdraw the statement made regarding munafik, because in my view it contradicts Standing Order 45 (13). So, in my view this is final, that Layang-Layang must withdraw that statement.
Then, the Honourable Speaker made a ruling on page 35, so it supersedes the first. Secondly, Clerk, please check: there is a rule in the Sitting that says if you want to object to what a Member says, you do it at that time. Not 24 hours later. Can't that rule be checked?
Honourable Mr Speaker, in Layang-Layang's case I have already raised it.
Which Standing Order, Honourable Member?
The rule raised is about the matter concerning Layang-Layang on the 25th of the month, that's it. 26, 46, yes. Honourable Mr Speaker has made a ruling, Honourable Mr Speaker advised that if possible there should be no more after this. That's what we understand. I thought when Kempas spoke, he said I was going around in circles, yes, and he also did not withdraw. That is why we must be fair, not only to Layang-Layang, right? It must also be for Kempas, but I don't mind, because Honourable Mr Speaker has made a decision from now on, that is our understanding. So, we must be fair, I ask, in this matter, Honourable Mr Speaker.
This is what I explained: on the 25th of the month, I explained that Layang-Layang must withdraw. That is clear, that is clear. Later, sit down, settle first, sit down first, Layang-Layang. I explained on the 30th of the month that Layang-Layang must withdraw. So, what is said from now on means that we do not want anything like what Layang-Layang did to happen again from now on. Ha, see that (House applauds). That means, he did not state that when I say from now on, Layang-Layang need not withdraw. Layang-Layang must withdraw. Why? We do not want this to happen again from now on. Ha, ok, I want to be brief. I ask Layang-Layang now to withdraw the statement made in this House, recorded in this Hansard, said during his speech, that the Pakatan Harapan government is a munafik government. I ask Layang-Layang to withdraw it. Final.
Honourable Mr Speaker, I respect what the rules say.
Mr Speaker, ask Layang-Layang to withdraw.
Nanti dulu.
But Honourable Mr Speaker, I need to clarify Standing Order 45, just a moment, Honourable Member, yes, (13), 45, which clearly states that matters considered as treasonous words...
Which Standing Order, Honourable Member?
Standing Order 45 (17) also exists, which states that it must be done immediately, like the Honourable Member's ruling said, at that time. A word, whether it is treasonous, seditious or hurtful, depends on the time it is uttered. If Honourable Rengit is considered to want to flick his ear, whatever, if he feels that matter is not hurtful to him, it does not violate any rules. But if, for example, the seditious word disturbs the feelings and emotions of that side, it must be raised at that time and moment. It is in the Honourable Member's Standing Orders. So, is the Honourable Member saying this ruling does not apply? I have agreed with the Honourable Member's view a few days ago, because the Honourable Member himself explained that it must be reprimanded immediately. That is clear in this matter, Honourable Member. So, if the Honourable Member wants to make another ruling, it is not possible. That is the ruling that exists, that we use: immediately, clearly.
Speaker, Mr Speaker.
Wait, let me explain first. The rule in Standing Order 45 (13) does not state when it is necessary to object, right? A Member must never, 13 (c), 14 (45), 13(c), use vulgar language. When this is raised by other Members, it is an urgency that must be acted upon by me, yes. So, when Gambir mentioned that matter and repeated what Layang-Layang said, then the ruling was made at that time. So, I think that is the decision, that Layang-Layang must withdraw, and I use 46(4), yes. 46(4): when a matter arises as to whether a Member is in accordance with the Standing Orders or not, that matter shall be decided by the Speaker or the Member presiding over the sitting, and that decision shall be final in all problems concerning rules and decorum. So, the decision regarding withdrawal of this statement is final, 46(4). Ok, I ask Layang-Layang to withdraw now.
Honourable Member, I ask to defend myself here. That is what I ask, because what I said is true, and the truth is very painful, or difficult to swallow. Because the promise made by the Pakatan Harapan government was not 5 years, it was 100 days. It is now 540 days, Honourable Member. That is one. Secondly, why double standards, asking me to say, supposedly I used vulgar words? I said the Arabic word munafik; in Malay, the word is mungkir janji (breaking a promise). I want to quote page 31, the 24 November draft, verbatim, on 24 November, Sunday. A Member said that the one who was very fond of urinating on the government was before, not now (House applauds). He said the Barisan Nasional government was very fond of urinating. Why was that statement not asked to be withdrawn? There was a Menteri Besar, Menteri Besar phase 2, when he was EXCO, what did he say to the Barisan Nasional government? Every time we defecate, he had to clean it up, clean defecation, clean defecation. How many times did he say it? Why double standards, Honourable Member? This is unfair. I ask for justice in this honourable House, Honourable Member (House applauds).
Honourable Mr Speaker, ...
Stulang.
I think we need not waste time here any longer, quarrelling here. So, I use the order of Standing Order 32(8). Since Layang-Layang did not comply with the Speaker's order to withdraw the word munafik, therefore under Standing Order 32(8), Stulang wishes to move a motion that Layang-Layang be referred to the Committee on Rights and Freedoms. At that time Layang-Layang can defend himself and so on. So I, Stulang, wish to move a motion that Layang-Layang be referred to the Committee on Rights and Freedoms.
Ok, thank you.
Honourable Member, if you want to bring me to the Committee, you may, but don't have double standards, Honourable Member.
Layang-Layang, sit down first, ok, eh. 32(8): a motion that is acknowledged as important by the Speaker or the presiding Member and supported by 10 Members who stand in their respective places. Is there support of 10 Members? (Honourable Speaker counts) 10, ok. So, it goes to the Committee on Rights and Freedoms. Ok.
Honourable Mr Speaker, the House is enjoyable today, interesting. Just now the Honourable Member moved that Layang-Layang be brought to the Committee of Rights. I want to make a motion, Honourable Member, 29, eh, a motion under Standing Order 29, a motion to adjourn the sitting because of discussing...
Honourable Member, 29, hand that document to me only.
Done, done. I've handed it over.
Ok, I will refer to it first, yes.
I already handed it to the Clerk's Office earlier.
Ha, hand it to me. Ok.
Ok, I want to ask that this House be adjourned because we want to discuss a very important matter that is worrying the people across the whole country today. And this House must pass a resolution, all of us together in this House. Because today there are efforts to provoke our national unity. The whole nation is anxious today, Mr Speaker, and I want to move that this House be adjourned so that we can discuss and debate and pass a resolution, so that this honourable House can... I humbly ask to bring the motion to adjourn this House, so that we discuss the matter that needs to be expedited.
Recently, there were parties who deliberately sought to stir up controversy and challenged the directive of the authorities that banned the ashes of the former leader of the Communist Party of Malaya, Chin Peng, from being brought back to this country. He was a traitor to the country who brought suffering to the people of this country. This act was deliberately done to stir up racial tension, and moreover, to cause discomfort to the members of the soldiers and the victims of the atrocities of the late leadership. Their sensitivities must be taken into account, and let there be no party that tries to revive the ideology of the PKM.
So, Honourable Member, I want to propose that this honourable House, unanimously, takes stern action against those responsible for bringing back the ashes, the body, the ashes of the body of the Malayan communist chief leader, Chin Peng! And, even though investigations are being carried out. We, as Johor leaders, want to hear the voice of the people, and in line also with the message of Tuanku, yes. The message of Tuanku that the Bukit Kepong Gallery is a black history for the country during the opening of the Bukit Kepong Gallery. I bring this motion, Honourable Member.
Yes, hand it to me. Ok, I will read out the motion brought by Rengit, yes. Recently, there were parties who deliberately sought to stir up controversy and challenged the directive of the authorities that banned the ashes of the former leader of the Communist Party of Malaya (PKM), Ching Peng, from being brought back to this country. He was a traitor to the country who brought suffering to the people in this country. This act was deliberately done to stir up racial tension, and moreover to cause discomfort to the members of the soldiers and the victims of the atrocities of the late leadership.
Their sensitivities must be taken into account, and let there be no party that tries to revive the ideology of the PKM. I want to propose that this honourable House unanimously proposes that stern action be taken against those responsible for bringing back the ashes of the chief leader of the Malayan communists, even though the Police are investigating. We, as Johor leaders who listen to the voice of the people, need to make a clear explanation on this issue. I consider that this issue is important, needs to be expedited and is of public interest, and if there are 10 supporters, count 10, so I accept this motion to be debated after our break. I give 2 from the opposition side and 2 from the government side. So we adjourn for 20 minutes until 11.40. Thank you.
The sitting was adjourned at 11.25 am.
The sitting resumed at 11.40 am.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and peace and well-being. To implement Standing Order 29, the motion under Standing Order 29 brought by Rengit, I invite the Rengit side to present: 2 from Rengit's side, 2 from the government side. I give 5 minutes, 5 minutes is enough, yes, please proceed.
Honourable Member, 2 from BN, not Rengit,
2 from the left side, 2 from my right side, please come forward.
Assalamualaikum warahmatullahi taalla wabarakatuh, salam sejahtera, salam muafakat nasional. Honourable Mr Speaker, thank you for agreeing that we table an issue, a current issue that is extremely sensitive in our nation's history, Mr Speaker. I begin with a story that is truly heart-wrenching, yes, about how 10,000 police officers and soldiers and fighters who defended our country died because of the actions of the terrorist leader Chin Peng, and many became widows, orphans, and many more became victims.
Mr Speaker, recently I have seen provocation against national unity growing worse, and I praise Mr Speaker alhamdulillah for allowing us to debate this. This is not a matter of the dead or the living. What we want to bring into this honourable House is the matter of provocation against national unity. If this cannot be contained or controlled from now on, it will affect the tension in racial relations in our country, Mr Speaker.
So, Mr Speaker, this is also not a racial issue, yes, not a racial issue. There is also a ban, not only on Chin Peng but on Rashid Maidin, as well as Shamsiah Fakeh and Abdullah Sidek. So, Mr Speaker, I mention this because recently we have seen the Malaysian flag being turned upside down. When asked why this happened, the police said they are investigating. Why was the Malaysian flag altered, with only 5 stars left? The police are investigating. These matters have made the situation unsettling, and more unsettling among the population of our country.
Mr Speaker, what is more, here in Johor there is the Bukit Kepong Gallery, which was officiated by His Royal Highness the Sultan, which has a great historical connection to how the communists attacked 180 people. And it happened at Bukit Kepong, in the area of the Most Honourable Menteri Besar of Johor. So, I think we must take a stand as all Members of this House, so that a motion we debate can take immediate action, and a report must be tabled to all the people. How was this ashes able to be brought back, and to the point that it sparked racial tension in our country? So it is not a matter of Malay or Chinese; this is a decision that was made by the Cabinet.
Earlier it was offered to Rashid, that Chin Peng could return, but he did not want to return, and when the government made its decision, what is surprising is how these ashes were brought back without police control. The police did not know, yet I understand the police knew the movements of the ashes of the body, from where to where, and even as far as the bay. That is what worries us today: how the government has been unable to resolve this problem. Why did this happen in the PH government era, Mr Speaker?
So my motion is that I ask us to discuss and decide that Johor is united, that the State Assembly members are united, unanimously, so that the federal government makes a resolution to take immediate action against those involved, no matter who is involved, so that this matter can be resolved immediately. Otherwise, Mr Speaker, I am confident this issue will become a major problem for this country, and the PH government must take immediate action.
Tanjung Piai has proven that the people rejected this government, PH by 15,000. If this issue is not acted on immediately, many more people will rise up to reject the PH government. So, Mr Speaker, this is my proposal, and I ask that fairly and honestly, this entire House make a unanimous decision, the most important thing being unanimity, not only the BN side but a unanimous call for the government to take immediate action against those who deliberately sparked this provocation. Thank you, Mr Speaker.
Thank you. Next, the Honourable Bukit Naning, please.
Thank you, Mr Speaker. We feel that Bukit Naning agrees with the view that communist ideology must not be allowed at all to be brought into Malaysia. But the matter of these ashes is a matter of a request from the family, so it has nothing to do with what we think, that the Malaysian government was involved at all in the matter of bringing Chin Peng's ashes here. The matter of Chin Peng's ashes, Mr Speaker, being brought into Malaysia was done through smuggling. So, this is a legal matter in which these ashes were secretly smuggled into Malaysia and there was no direct request from any party.
So Bukit Naning feels this issue should be resolved according to the law, that is, we hand it over to the police to carry out investigation and prosecution. So, once again Bukit Naning emphasises that this does not involve anyone who tries to spark racial provocation. This is the wish of Chin Peng's family. So Mr Speaker, once again Bukit Naning emphasises that this is a matter of security and law, and we leave it to the police to continue the investigation and provide their views to the Malaysian government. So, I think that is all from Bukit Naning, thank you, Mr Speaker.
Yes, Benut, please.
Thank you, Mr Speaker. The motion we put forward this morning concerns actions that violate government decisions. We also understand that the Haatyai peace agreement was signed in December 1989. It is wrong if any party says we are not aware of the existence of the Haatyai agreement; we are aware. And I do not agree if we only look at it in terms of legal rules, or whether or not action should be taken for smuggling or for smuggling prohibited goods.
As an understanding that we should adopt, the issue before us is that our understanding, our decision, and society's acceptance of communist ideology is certainly rejected, and it has been agreed, as the Honourable Rengit said earlier, that this is not about race, this is not about Malay, Chinese or Indian. But we realise that we deeply regret what has been done by those who fight for communist ideology, to the point that the Bukit Kepong Gallery has been established. So, if we do not voice our objection as citizens of Johor, as the highest body, the policymakers and also the lawmakers of this state, then it means that our efforts to establish the Bukit Kepong Gallery were a futile action.
It means nothing; the gallery was built and established to make the people aware of the dark history in our country so that it becomes a reminder, so that it does not recur, and so that it is something we must avoid repeating. Therefore, the responsibility to ensure harmony, unity and peace in this society is a shared responsibility.
So Mr Speaker, when matters like this happen in this honourable House, as representatives of the people of Johor we must take a stand. We cannot simply leave the matter to legal action. That is one principle in the administration of government: we have the executive, we have the treasury, we have the legislature, that is correct. Each is given power fairly and justly.
But as this House that guards sensitivities, we want to guarantee that in future it does not recur, so when such matters happen, the legal process will proceed as usual, but as citizens of the state, as citizens of Malaysia, we must have a stand. We firmly reject the act of stirring up sensitive matters again. We want, if possible, that the kind of action we bring or suggest through this motion be directed at the act of bringing back the ashes, Chin Peng's ashes. That is the issue, not about whose ashes they are, whether a cat's or the ashes of other animals or other people, no, that is not the question. It is about the rejection by the nation, by our citizens, of these communist fighters. So we, when we permit, even though the Minister of Home Affairs himself has already said that the government never allowed Chin Peng's ashes to be brought back to Malaysia. So, this has made clear that the matter violated the rules and so on, not that, Honourable, that is for the government to handle. But as this honourable House, we must have a stand that we reject the act of those who tried to spark this matter. If they had not smuggled these things in, this might have been manageable, perhaps it could have been handled in a way that did not cause anger among the people. It is possible, not impossible to do. But why must it be smuggled? Why must it be? Are today's border petrol guards from the PH era all able to let anyone in? Surely not. Surely the government in power today is also competent in managing border demarcation. But the smuggling issue has its own laws. So what matters most is the effect of that act. So, we must have a stand...
Five minutes have passed, Honourable.
This House only wishes to remain silent on matters of this kind. So, Mr Speaker, we as the opposition feel that this House must firmly reject them and demand that this House take a stand that we reject efforts to re-ignite the dark history of our nation. Thank you.
Ok. Senggarang, please.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Mr Speaker, thank you for giving me the opportunity to debate this matter. As is well known, communist ideology is an ideology that contradicts the Federal Constitution of Malaysia and has been rejected by the government at this time and in the times before, eh. And we are also aware that the history of the peace agreement with the government at Hatyai, Thailand, mentioned by Benut earlier, was in 1989, December 1989, which was handled by the government at that time. And, according to the news we have read, the government as stated never allowed the ashes of the former leader of the Communist Party of Malaya, PKM, Chin Peng, to be brought back to Malaysia. That is the statement from the Minister of Home Affairs, Tan Sri Muhyiddin Yassin. And, as far as I know from the news I read, there was no request from the family to bring the body back to Malaysia. And that matter of bringing the ashes for the ritual ceremony was handed over to the family, is it? So the question is, it is up to the police to, I leave it to the police to investigate this matter, and if it is contrary to the law, action must be taken. However, for us, our stand is that communist ideology is certainly not permitted in Malaysia. It is contrary to the Malaysian Constitution, and all matters that need to be done, that will be done by the people, must follow the legal principles laid down by the Royal Malaysia Police through the constitution of our nation, Malaysia. Thank you.
Ok, the debate on the motion moved by Rengit is now concluded. I have looked carefully at both sides of this debate, and I am of the view that this House supports the motion, or the consensus reached by Rengit. Ok.
I am using Standing Order 29(3), it is not necessary to obtain a decision on it. So, I think all the House agrees with what was said earlier. I think it means no one objects, so this motion is accepted by this House. Ok. (The House applauds.)
Thank you, Mr Speaker.
Thank you, but please note, this is the first motion in the history of the House, a motion from the opposition permitted in the House. This is, what is it called, an improvement to the House for the welfare of all, eh.
Continuation of debate on the second reading of the Appropriation (2020) Bill for the year 2019.Bill
Honourable Members, the continuation of the debate on the motion for the Second Reading of the Enakmen Perbekalan (2020) Tahun 2019 is now resumed.
I now invite the Honourable Chairman of the Public Works, Transport and Infrastructure Committee to speak. Please proceed.
In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi taala wabarakatuh and peace and well-being. Honourable Mr Speaker, first of all Tenang would like to express thanks for the opportunity, as the first winding-up speaker for the debate on the motion of gratitude for the royal address delivered by His Royal Highness the Sultan of Johor, who graciously officiated the Second Session of the 14th Johor State Legislative Assembly. In conjunction with the celebration of the official birthday of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan and Ruler of the State and Dependencies of the State of Johor Darul Ta'zim, who turned 61 on 22 November, I respectfully offer my homage, humbly express my gratitude and pray that His Royal Highness Tuanku will be in good health and well-being, live a long life, and continue to reign over the throne of the kingdom to shelter all the people of Johor with justice and fairness.
Mr Speaker, the rapid economic growth of the State of Johor, which is moving towards becoming an advanced, competitive, sustainable and dynamic state, needs to be supported by complete infrastructure and a modern, integrated public transport system of world standard. The state government has a clear direction for achieving the aspiration to modernise the state's public transport system and infrastructure. The state government has also drawn up several planning schemes involving public transport and infrastructure that complement one another and are arranged in an inclusive manner, covering every corner of every area or district in the State of Johor. From Tanjung Piai to Tanjung Mas in Muar, regardless of whether the area belongs to the opposition or the government. For example, the Johor State Public Transport Master Plan 2045, which was specially drawn up to modernise the public transport system in the State of Johor by taking into account the network of transport systems across the whole country. Overall, there are 6 reference plans that will be used as guidelines, with the setting of various targets to be achieved for the short-term, medium-term and long-term phases. Every development plan prepared and implemented is ensured to be in line with the plans drawn up or implemented by the federal government. Here, I, as Chairman of the Public Works and Transport and Infrastructure Committee, record my thanks for the role of the Iskandar Regional Development Authority (IRDA) and the East Coast Region Development Authority (ECER), which have also contributed to the development of the State of Johor. Tenang also regards as important the role and contribution of PIPC, that is, the Pengerang Integrated Petroleum Complex, particularly in Pengerang.
Throughout the sitting that began on Sunday, 24 November, various matters were raised by the Honourable Members of this august House concerning the JKR, transport and infrastructure portfolio.
Mr Speaker, among other things, there is the proposal on the arrangement of jetties and ferries in the State of Johor, which was raised by the Honourable Benut. At present there are 9 passenger jetties providing passenger transport services from Johor and to international destinations in Indonesia and Singapore. Each one has its own uniqueness, and this uniqueness needs to be aligned with a study on the management of each jetty to look at the current situation, needs and capacity of the existing jetties to meet the needs of the economic and industrial sectors. The development potential of each jetty also needs to be given attention to see the ability of the jetties in this state to contribute economically in future. The results of this jetty management study will also help the government to plan and improve the water transport routes and services provided.
Observations show that there are still improvements needed in terms of the structural design of terminals and public facilities. Among them are the insufficient signage or directional signs and information boards for displaying ferry routes and travel times. Second, the prayer room and public toilet facilities are not managed properly. Third, the waiting area is uncomfortable and there is a shortage of food and beverage services, with permission, F&B and grocery or convenience stores. Fourth, the absence of counters for other supporting land public transport services. Fifth, the absence of comprehensive security, including a CCTV system and comprehensive control over the entry and exit of goods and passengers. Sixth, a safe loading bay for alighting and boarding passengers, especially passengers with disabilities (OKU). Therefore, the state government is of the view that a specific study is needed to improve the infrastructure and services of the ferry terminals and passenger jetties throughout the State of Johor so that they meet international standards, considering that ferry terminals and passenger jetties are among the entry points for tourists into this country. Therefore, the first impression of our country begins at the terminal. Thus, if we have high standards for terminal facilities, it is the first picture of our country as a civilised nation in terms of culture and the progress of its people.
The 9 ferry terminals that are currently actively operating are:
1. Kukup International Ferry Terminal, managed by Johor Public Transport, which offers the route to Tanjung Balai with 5 slots every day.
2. Tanjung Penggelih Terminal, managed by the Southern Region Marine Department, which offers the route to Batam with 1 slot every day.
3. Tanjung Belungkor Ferry Terminal, managed by Marina Ireland Venture Capital Sdn. Bhd., which offers the route to Changi with 2 lots, 2 slots a day and Batam with 1 slot a day.
4. Pasir Gudang Ferry Terminal, managed by Pasir Gudang Terminal Sdn. Bhd., which offers the route to Batam with 5 slots, sorry, I apologise, a total of 9 slots, and the route to Tanjung Pinang with 2 slots.
5. Stulang Laut Ferry Terminal, managed by Berjaya Waterfront Sdn. Bhd., which offers the route to Batam with 15 slots and Harbour Bay, Batam with 8 slots, while the Tanjung Pinang route has 3 slots.
6. Muar Ferry Terminal, managed by the Southern Region Marine Department, which offers the route to Bengkalis with 2 slots and the route to Dumai with 2 slots.
7. Mersing Ferry Terminal, managed by the Southern Region Marine Department, which offers the route to Pulau Tioman and route slots based on the monthly schedule.
8. Batu Pahat Ferry Terminal, managed by Minyak Beku Feri Terminal Sdn. Bhd., which offers the route to Selat Panjang with 1 slot.
9. Puteri Harbour Ferry Terminal, managed by UEM Sunrise Sdn. Bhd., which offers the route to Tanjung Balai with 6 slots and to Batam with 5 slots.
At present, all the ferry terminals in Johor are serving 10,000 passengers a day, going and returning, and that is precisely why it is important for us to organise these ferries and terminals so that they can contribute one, what is it, one, one, not only an image for the State of Johor but also a contribution to the economic development of the State of Johor.
Benut also asked about the high speed rail, or HSR, and the RTS, which were said to have been postponed. For the information of the Honourable Member, the proposed HSR development has not been postponed, but is under careful study to determine the most suitable alignment. The state government welcomes the implementation of this high-impact project. However, the Malaysian government has decided to postpone the HSR project, its implementation until 31 May 2020, to evaluate its implementation and the reduction of project costs. Among the matters being refined are:
1. Optimising construction costs through a review of the type of structure and land acquisition costs. 2. Optimising procurement plans and project implementation. 3. A design that complies with technical requirements. 4. Minimising social and environmental impact.
As for the RTS, it has been explained earlier by the Honourable Gambir, however, it may be further added that on 18 October 2019, the Ministry of Transport Malaysia obtained approval from the Cabinet to proceed with the RTS project with changes to the structure, scope and specifications of the project. The overall cost of the new project is estimated to be reduced from RM4.93 billion to RM3.16 billion, that is, a saving of RM1.77 billion, which is 36% of the original estimate. This is lower than the original cost when this project was under the administration of the previous government.
Mr Speaker, the newly formed Pakatan Harapan government is always mindful of the expenditure costs borne by the government so that it gives maximum impact or returns to the people. That is why recently, I, during a visit to Tanjung Piai, there is a bridge there, which crosses the Sungai Pulai, as a result of renegotiation with the contractor, Pakatan Harapan has succeeded in reducing the construction cost of the bridge by RM20 million. (House applauds.) RM20 million, Mr Speaker, can build many new classrooms, clinics, bridges, village roads. So, that is Pakatan Harapan, it always looks for ways to reduce costs and optimise results.
Mr Speaker, one important feature in the revised structure of the RTS project is the involvement of developers and landowners of Bukit Cagar to finance and enable this project to proceed with the land cost being exempted. Combined with the optimised construction and rail system costs, the government has succeeded in achieving significant savings, thereby making it more financially viable.
Mr Speaker, Benut also touched on why there is no study related to the proposal to widen and add lanes to the North-South Highway. For the information of Mr Speaker and the Honourable Member for Benut, the North-South Highway was built based on a concession agreement, and additional construction or widening of the highway, whether from 4 to 6 lanes, is subject to the concession agreement. Therefore, if the government wishes to do it on its own, it must bear the full cost, unless the concessionaire company agrees. However, a series of discussions has been held regarding the proposal to widen the North-South Highway together with PLUS, the Ministry of Works and the Highway Authority. The IRDA has also proposed to the federal government that this matter be refined and implemented. However, the state government has also requested that the central government include this proposal, meaning that we in the state government have included this proposal in the Twelfth Malaysia Plan.
Mr Speaker, there are some others raised by our state assemblymen (ADUN) regarding street lighting facilities and so on. For example, from the YB from Kahang, so this is among what we found: the access road to FELDA Ulu Penggeli is a federal road connected to the main route FT091, the Kluang - Kota Tinggi road. The accidents that often happen at the entrance junction to FELDA Ulu Penggeli from the main route FT091 are caused by lighting problems at night. Based on monitoring carried out on site, it was found that there is only 1 lamp post at the three-way junction of the entrance road to FELDA. Therefore, to overcome this problem, the state Public Works Department has applied for an allocation from the central government amounting to RM200,000.00 in February 2019. The street lighting installation works will be carried out once this allocation is approved. The installation of street lighting at the junction of the main road from Belitong to Renggam has already been listed under the state development allocation RJ5T for the 2020 programme, which is expected to be implemented next May.
Mr Speaker, there is also a question about federal government allocations for maintaining state roads and village roads through the MARRIS programme. For the information of all Honourable Members, MARRIS allocations, state roads cannot be used for maintaining federal roads, because it contravenes the management procedures in the MARRIS guidelines. MARRIS allocations may only be used or are permitted for the maintenance of state roads only, in accordance with Article 109(1)(6) of the Federal Constitution.
Seri Medan raised several questions, but I think I will address them in the following section. Mengkibol proposed building a new highway in order to achieve greater synergy or economic impact. Based on the existing record of level of service (LOS), the connecting road Batu Pahat – Kluang – Mersing, FT50, is still able to accommodate vehicle capacity and does not need widening or an alternative road. However, from the aspect of safety and studies that have been carried out, FT50 needs to be upgraded by building road dividers and U-turns, to reduce road accident statistics. The FT50 upgrading project has been listed as a main item, included in the Twelfth Malaysia Plan programme. However, if a new road needs to be built, social and economic studies must be carried out first.
There is a question on the same matter and I would like to announce that the government has approved the construction of a U-turn median and related works on the road
Batu Pahat - Ayer Hitam, 4 lane, dual carriageway phase 3A. This one has been approved, from kilometre 35 to kilometre 36, that is Parit Sempadan, Batu Pahat up to after the Ayer Hitam toll. Along 14 kilometres, so the allocation has been approved, God willing, we are in the process of ensuring it goes through the next process.
Mr Speaker, Pasir Raja applied for the allocation for the construction of a new shortcut road between the secondary school and the primary school in FELDA Bukit Besar, which had been cancelled, to be re-approved in order to address the issue of frequent accidents on that road because it is the main road and the only road leading to the school.
Mr Speaker, the allocation to implement the shortcut road project between the secondary school and the primary school in FELDA Bukit Besar has not yet been implemented this year, has not yet been implemented. However, the proposal to proceed with this project will be applied for again through the allocation for next year under the Prime Minister's Department. I request Pasir Raja and also the other Members of this House, whether from the opposition or the government, to remind me from time to time about the project needs in their respective areas so that I can raise them at the departmental level, at the state government level or at the central level.
Buluh Kasap asked about the Kuala Paya bridge project, which has been abandoned and halted; when can it be restarted? Mr Speaker, for the information of the House, the original completion date of this project was 14 February 2019. An initial extension of time was approved for the contractor until 28 July 2019. However, up to today, no physical work has been carried out at the site, and the Public Works Department has found that the contractor was not serious in implementing and completing this project. Therefore, the Public Works Department issued a notice for termination on 8 October 2019. The latest status of the project is that it is in the process of termination of the works.
This, Mr Speaker, is among the problems we face, namely, incompetent contractors. These are old stories. Sometimes, a contractor with RM2.00 capital gets projects worth millions. So, now, as I mentioned before, we will ensure that contractors who have experience, who have sufficient finance and who are sincere will be prioritised in selection to obtain works, whether at the state or federal level.
Permas asked about the safety of the public at international ferry terminals. He specifically mentioned the Pasir Gudang terminal. This terminal is managed by Pasir Gudang Terminal Sdn. Bhd., which offers the route to Batam with 7 slots, carrying 17,000 passengers a month. And the route to Tanjung Pinang with 2 slots, carrying 400 passengers a month. This terminal helps the government send back Indonesian undocumented immigrants (PATI) to Tanjung Pinang, considering that this terminal is the exit route closest to Tanjung Pinang.
In terms of security, in 2018, there was one case of smuggling of an endangered animal, namely birds, which was handled by PERHILITAN, the Department of Wildlife and National Parks. One drug smuggling case was recorded and the case was handed over to the Seri Alam District Police Headquarters (IPD), and one case of theft of company goods was handed over to the Seri Alam Police Station (IPS). In 2019, there were two cases of loss and theft of wallets. One case of car break-in and one case of hit-and-run. If we look at these records, the government's security incidents are isolated issues that occurred in Pasir Gudang, and the terminal complies with the ISPS requirements (Statement Of Compliance), where terminal management has conducted security training and drills seven times a year, four times a year and other competency training for all security personnel and staff at the Pasir Gudang ferry terminal.
As for ferry safety issues at sea, none have been reported so far. This is because the terminal strictly complies with the ISPS requirements that have been set by the Marine Department. However, terminal management is from time to time always reminded to improve the infrastructure and services in their respective places.
Permas also wanted to know about the Pasir Gudang hospital project. This hospital belongs to the Ministry of Health, but the JKR is the implementing agency. So, the JKR is an important component in ensuring that projects, whether federal or national, can be implemented on schedule. The construction of the Pasir Gudang hospital proposed above, built at Jalan Gunung Besar, Seri Alam, is still proceeding as planned. The estimated project cost, amounting to RM500 million, has already closed for tender, and the tender closed on 21 November 2019. The current status is that the project is at the Evaluation Committee stage. Based on the planning schedule, the Letter of Acceptance will be issued on 13 April 2020, God willing.
Tenggaroh asked about the status of the Mersing bridge. Mr Speaker, as is well known, to overcome the congestion on the Mersing bridge, especially during the festive season, the state government has proposed that a bypass be constructed. The state Public Works Department has identified the location for the Mersing bypass road and made a cost estimate amounting to RM75 million for implementation. For the information of the House, the Mersing bypass project was applied for in the priority list under the RMK-11, RP 5th, but was not approved. However, this project will continue to be applied for as a priority in the RMKe-12, and the good news today is that the Most Honourable Member, our Honourable Member is very concerned about this project, and today he has, I am informed by the JKR, that the Most Honourable Member will bring this matter personally to the Most Honourable Deputy Prime Minister, who is visiting Johor today.
Tenggaroh's question, hoping that the budget for street lights can resolve the street lighting problem in his area. Street lights are indeed implemented by KPLB, some are carried out by the District Office, and some are also by JKR. And we always ensure that these projects will be implemented provided the allocations are available. The allocation application of RM21 million made for the 2019 programme proposal is still not approved at the central government level. The JKR will re-apply under the 2020 programme to overcome the lighting problem on the route in question and on other routes, so that our people can enjoy a better life and quality of living, including in rural areas.
Mr Speaker, there are also some Members of this august House who have mentioned the need to improve road projects at FELDA level, as in the budget presentation this year, the Most Honourable Menteri Besar stated that he would apply for a special allocation from the federal government amounting to RM30 million specifically to further improve roads in FELDA areas. However, some mentioned why the MARRIS project is not used for projects in FELDA areas. MARRIS is for state roads and village roads, so FELDA roads were previously under the Department or federal projects. That is why, with the application and God willing, if we get this RM30 million, we can implement projects in FELDA areas.
Senai asked what is the status of the Senai-Kulai shortcut road, which has been delayed? And can it be built? I am informed, and thank you, that the Senai side has held a proposal with the results of its study showing that the construction of that road is necessary. No problem, we at the state level will raise the proposal so that it is listed in the Twelfth Malaysia Plan. There was a mention of what the role of IRDA is in the 2020 Budget, because it was not explained in detail in that budget, since IRDA has its own programmes. IRDA will continue to play an important role in the economic, social and environmental development of the Iskandar Malaysia region. In 2020, IRDA will begin the implementation of the Rapid Transit bus project, a competitive mass transport system with a service coverage of 90% of populated areas. This project is expected to improve the quality of life of the community through reduced cost of living and access to education, health and employment. IRDA also ensures that existing projects continue with the support of the state government and local agencies, through development expenditure by the federal government, among them upgrading the existing Kempas interchange on the North-South Highway, which has been carried out at a cost of RM50 million. Second, the IRDA will carry out a study to improve the road from the Ring Road to the Eastern Dispersal Link, Johor Bahru EDL, and from the EDL to the Johor Bahru city centre at a cost of RM2 million. This is the cost for the study, yes.
IRDA has also proposed to the federal government that it consider the feasibility of the following projects:
1. Widening of the North-South Highway, which I mentioned just now; 2. Upgrading of federal route 1. 3. Extension of the West Coast Highway to open up new growth areas, accommodate increased traffic and ensure that logistics activities can continue to be strengthened for sustainable economic development.
IRDA also attracts various international funds in the aspect of enhancing mobility and the environment. The British Government, through the Prosperity Fund 2018, has allocated a total of 3 million pounds sterling to implement a study on an integrated and smart mobility management system and pilot projects in Iskandar Malaysia. I am confident that IRDA will continue to play an important role in placing Iskandar Malaysia and Johor in general on the world map through commitment to low-carbon development and other aspects of the environment. IRDA will also certainly continue to be committed to increasing the economic participation and capacity of the community, especially youth, through various projects such as the Youth Hub Village Enhancement Programme, Kawan Iskandar Malaysia and others, as presented in the reply of the Honourable EXCO Belia a short while ago.
Semarang again mentioned Ayer Hitam, Batu Pahat. Ayer Hitam Batu Pahat is long, so the sections in the areas of the relevant ADUN will be raised by them, and thank you. In terms of safety again, the study carried out on FT 50 needs to be upgraded by building road dividers and U-turns. As I mentioned earlier, phase 3A has been approved, and the phase for building the U-turn median and related works on Jalan Batu Pahat, Ayer Hitam, Kluang FT 050, 4 lane, Dual Carriageway, phase 3B from km 35 to km 49 will be listed in the Twelfth Malaysia Plan. The earlier one has been approved, but the next phase will be raised, what is this, this application after the first phase is completed.
My colleague from Sedili raised several problems and requests. Yesterday my officers looked at Google and went straight to the locations, not me physically going there, because it was already evening, night, so we opened Google. There are indeed some areas that need to be reviewed again, but there are also roads that appear quiet and are not so urgent to upgrade. However, indeed from time to time, I will, after this, I have told the JKR officers that we need to go to the areas to see the roads in question in order to see for ourselves the status and condition of those roads. And there are some roads mentioned by Sedili, such as Sedili to Sedili Kecil, we will look again. However, I found that the area is not yet very urgent for upgrading or widening.
Pekan Nanas mentioned several roads there which, it is said, if we can implement these, the Pakatan Harapan graph will rise, and I agree. We do many projects there too, but their assessment is sometimes different. We give many projects but the assessment is different, but as EXCO entrusted
in Sungai Boh recently, I would like to say thank you. I promised the people of Sungai Boh that if Pakatan Harapan wins, I will continue to be their foster father there. But because we were not fortunate, we lost, I will still continue to go there and, alhamdulillah, there was an increase in other places, perhaps decreasing, but in Sungai Boh, Pakatan Harapan voters increased by 5 people, that's enough. So, our aim is not this one, our aim is the 15th General Election (PRU15), where we will sweep both. But we must do the work, right, friends? (House applauds.)
The construction project of the shortcut road from Jalan Sawah to Pekan Ulu Choh will be implemented in phases. Phase 1 is still at the construction stage. In fact, at the construction stage, on-site progress has reached 50% completion and it is expected to be completed by mid-2020. Meanwhile, phase 2 of the project will be tendered once phase 1 is fully completed.
Perling mentioned contractors who carry out work at peak hours, midday, or in the morning, which causes congestion. Indeed, we at the JKR have established a system called the traffic management system to ensure that contractors carrying out work on the road use the best time to implement their projects. But we cannot require them to only work at night. If work is only done at night, the cost will increase with their labour costs rising, so the cost of building a road will increase. But therefore, we always hope that they will use the rules, namely the traffic management system, to reduce its impact on a project, reduce the impact on, what is it, traffic, that is, reduce the problems for residents in the vicinity.
It has been 34 minutes, Honourable Member.
Oh, it's already more than that, yes.
It has been 34 minutes.
Oh, that's why this is important, this road is sometimes like that, right. Ah, this is not rhetoric, there are many facts I might mis-state, mis-quote, and this road is long. I think there is one more thing, Honourable Member: the Public Works Department (JKR) and the agencies under me covering land, sea, air and what, rail, will ensure and always think about what changes we will make in the coming years so that Pakatan Harapan is seen to have vision, to further advance the state of Johor especially in infra and structure. So, I end this speech by once again thanking Honourable Mr Speaker and the Members of the House, and I open my door as Chairman of the Public Works (JKR), Transport and Infrastructure Committee, always open without appointment, so anyone can meet me to propose and review proposals for providing infrastructure for the state of Johor for the benefit of the people. That's all, thank you. Assalammualaikum warahmatullahi wabarakatuh.
Thank you, Honourable Chairman of the Public Works, Transport and Infrastructure Committee. Next, I invite the Honourable Chairman of the Local Government, Urban Wellbeing and Environment Committee. Please proceed.
Thank you, Honourable Mr Speaker, Honourable Members all. I begin my winding-up speech by first humbly offering my highest gratitude and heartfelt congratulations on the birthday celebration of His Royal Highness the Sultan of Johor, who turned 61 on 22 November last. Long live His Royal Highness Tuanku Sultan of Johor, may he always be in good health.
Honourable Mr Speaker, I take this opportunity to express my thanks, and indeed to welcome all the sound suggestions and views of the Honourable Members of the State Assembly in order to realise the vision of a prosperous and well-being Johor Bestari, which forms the basis of the 2020 Budget tabled by the Right Honourable Menteri Besar on 21 November last. A total of 6 strategic pillars have been outlined as the backbone of next year's budget tabling. The pillars of preserving the environment, improving the well-being of the people, and enhancing efficient and integrity-based governance are directly linked to the portfolio entrusted to me.
Honourable Mr Speaker, the pollution incident in Pasir Gudang has indeed been a turning point for us in the leadership, in the state government leadership and also for all the people of the state of Johor, who now give serious attention and commitment to the crucial importance of preserving and conserving our environmental heritage. Therefore, environmental management has become the focal point of mine since taking up this trust, and I record a heartfelt appreciation to the state government leadership that approved the establishment of the Johor State Standing Committee on the Environment to coordinate environmental management in an integrated and effective manner, with the spirit of consensus being a blessing. The committee chaired by me today will be founded on the vision of driving sustainable development towards shared prosperity, with the aspiration to support and fulfil every goal focused on in the international document, the Sustainable Development Goals 2030, or sustainable development gold, with permission, 2030. I am committed and indeed confident that the Johor Budget 2020, supported by the 2020 Budget of the federal government, is able to restore the value of our environmental heritage, at a time when ecological threats are increasingly showing their impact.
Following on from that, my speech today will be divided into 3 segments according to portfolio, namely Environment, Local Government and Urban Wellbeing. Honourable Mr Speaker, as announced by the Right Honourable Menteri Besar last week, the Johor Low Carbon Council (JLCC) was established as a platform to discuss and plan low-carbon initiatives in a planned manner, while at the same time intensifying efforts to build a low-carbon society and reduce greenhouse gas emissions.
The low-carbon initiative has attracted the attention of Honourable Members, whether through oral question sessions or debate sessions during this sitting. Among those that caught my attention is the implementation of a carbon tax mechanism, as raised by the Honourable Member for Skudai and also the Honourable Member for Senai. In principle, the carbon tax mechanism needs to be refined so that its implementation is not rushed, considering that at the federal government level itself it has decided that the tax is not suitable to be implemented at this time, with the decision to drive the arrival of foreign investors into our country.
However, the suggestions made by the Honourable Member for Skudai and the Honourable Member for Senai will be given attention by the Johor state government by bringing them to the discussion table together with the Ministry of Environment, Science, Technology and Climate Change (MESTECC) and the Ministry of Finance, to look at the potential of their implementation, the legal impact, and policy support at federal and state levels. As preparation towards implementing the mechanism, the Johor Low Carbon Council at its first meeting last has decided to establish a carbon emissions information base, through an initiative that calculates and records carbon emissions such as the building energy monitoring and reporting system bank and the comprehensive assessment system for building environment efficiency (CASBEE). The building of a low-carbon society, which began implementation in 2012 in the Iskandar Malaysia area, will be intensified through the JLCC in line with the goals outlined by SDG 2030. To intensify this effort, 5 Local Authorities (PBT) in the Iskandar Malaysia area have been designated as pioneers to make the low carbon society initiative a success, while contributing to the inventory of greenhouse gas emissions. Therefore, I am pleased to inform that the Iskandar Greenhouse Gas Inventory Study is expected to begin in early 2020, to be monitored by the Johor State Economic Planning Unit (BPEN), with cost sharing involving 5 PBT in the Iskandar zone.
Honourable Mr Speaker, it is common knowledge that the condition of rivers in the state of Johor is at a worrying level, to the extent that it has drawn the attention of various parties including the Regent of Johor. Indeed, the issue of river cleanliness across Johor was raised in this honourable House by the Honourable Member for Pemanis on 25 November last. As suggested, the Johor state government certainly takes into account the role of all parties and all levels of society in conserving and protecting the rivers that serve as access points for this state.
Following on from that, the Right Honourable Menteri Besar proposed last week the implementation of the One District One River Programme through the allocation in the Johor Budget 2020, to be managed by the Irrigation and Drainage Department (JPS). In this regard, I call upon all levels of society and non-governmental organisations (NGOs) across the state of Johor to join together in making this initiative a success and ensuring our rivers are once again clean and clear. I also invite Honourable Members to take part in disseminating information to residents in their respective areas to make this initiative a success.
Honourable Mr Speaker, in recent times, the human-elephant conflict in the state of Johor, particularly in the districts of Kota Tinggi, Mersing, Kluang and Segamat, has gone viral on social media, and was also reported by the print media. This problem was also raised by Honourable Members through oral and written questions, and indeed became the topic of debate by the Honourable Member for Kahang on 24 November last. As clarification to Honourable Members, the Johor State Department of Wildlife and National Parks (PERHILITAN) has proactively taken action through patrols, monitoring and shooting to scare away elephants in the hotspots of conflict, to reduce and resolve the elephant conflict in the short term.
In addition, long-term measures are also being implemented through the installation of the Elephant Electric Fence System (SPEG) with a length of 56.8 km at Kampung Silik Lukuk, Kluang, Kampung Tenang Labis and Kampung Mawai, Kota Tinggi, involving a construction cost totalling RM2.705 million. Apart from that, the installation of satellite collars as an Early Warning System for Elephant Movement was also implemented by PERHILITAN, and capture and relocation operations of elephants are carried out as needed. The Johor state government is very concerned and serious about this elephant conflict because it also involves the lives of residents nearby.
Following on from that, PERHILITAN has held engagement programmes with stakeholders related to elephant management in Johor, in addition to holding the Outreach and Public Awareness Programme and advisory services with the community, especially local leaders and farmers, to manage human-elephant conflict. The long-term solution now awaited by the Johor state government is the construction of the Johor Elephant Sanctuary (JES), which has seen the development phase involving the building of offices, a quarantine or overnight enclosure building with a capacity of 7 elephants, and staff quarters completed and handed over to the Irrigation and Drainage Department as the controlling officer. The Johor Elephant Sanctuary is currently still undergoing final processes to complete electricity supply facilities and elephant pasture before being handed over to PERHILITAN as the owning agency.
Honourable Mr Speaker, besides elephants, I also take seriously the problem of monkey nuisance raised by the Honourable Member for Senggarang during the debate session yesterday, based on 18 complaints recorded by PERHILITAN Johor State in the area of the Honourable Member for Senggarang. Proactive measures of both long-term and short-term nature have been taken to ensure the safety of residents is always guaranteed. Among these measures is the installation of 2 monkey traps and 9 funnel traps, as well as the disposal of the monkeys captured.
Factors such as the survival rate, abandoned agricultural land and the opening up of forest areas have led to wildlife conflicts such as with monkeys. However, PERHILITAN Johor State has succeeded in capturing and disposing of a total of 66,275 monkeys over the period 2014 to 2018 throughout the state of Johor. Mindful of such disturbance and threats from wild animals, PERHILITAN has implemented integrated operations involving the People's Volunteer Corps (RELA), the Village Community Management Council (MBKK) and licensed hunters for those animals throughout the state of Johor.
Honourable Mr Speaker, the matter of efforts to develop Kukup National Park, Johor Pulau Kukup, was raised by the Honourable Member for Benut during the debate session on 24 November last. It is emphasised that the Johor state government today is committed to preserving and conserving the natural heritage that is clearly reflected through the re-gazettement of Pulau Kukup as a National Park under the supervision of the Johor National Park Corporation, effective 31 January 2019 last.
For the information of this honourable House, the RAMSAR site status held by the National Park will be utilised optimally, with the injection of local economic value in the prospects of eco-tourism, as has already been achieved. Therefore, the Johor National Park Corporation has planned and will be allocated funds through the Johor 5-Year Plan (RJ5T) and the Twelfth Malaysia Plan (RMK 12) to rehabilitate and upgrade the implementation of tourism in the form of facilities, safety and comfort for visitors.
The re-gazettement of Pulau Kukup as a National Park also takes into account its heritage, which balances development while fulfilling the state government's aspiration to preserve the environment. Hence, I suggest that the Honourable Member for Benut should also look at the wide-ranging prospects this National Park possesses, namely in terms of an environmental education hub, in addition to becoming a focus of research activities related to mangroves, involving educational institutions as justification for such measures.
Honourable Mr Speaker, I continue my winding-up speech by touching on the Local Government segment, which has been raised by Honourable Members. Solid waste management has received serious attention and was raised during the debate session by the Honourable Members from Sri Medan, Permas and Panti. The rapid urbanisation and development process in the state of Johor has witnessed an increase in waste generation to reach an average of 3,600 metric tonnes of rubbish per day, meaning roughly 1 kilogram per day for every Johor citizen.
However, such a process has also had a direct impact on the lifespan of disposal sites in the state of Johor. As decided by the Johor state government last May, the relocation of the Bukit Payung Sanitary Landfill, which began in 2007 under the previous government's leadership, will be continued to meet the disposal needs of waste in the Northern Johor Region. The state government has held negotiation sessions with the objectors' group and even set up a technical committee to re-examine a suitable new site as an alternative to the Bukit Payung rubbish disposal site.
However, following investigation, the committee found that the potential site was not suitable because it is close to water sources and flammable peat soil. In this regard, the state government wishes to inform that the Bukit Payung Solid Waste Disposal Site will be continued by adopting the concept of Waste To Energy (WTE), which is environmentally friendly, clean, green-technology based and of minimum area. The Johor state government is confident that the Bukit Payung Solid Waste Disposal Site is the best solution for solid waste management in the northern region of Johor.
Honourable Mr Speaker, the debate speech of the Honourable Member for Permas yesterday also drew my attention, and in his winding-up speech today he touched on the waste disposal system using incinerator technology in Pasir Gudang. I take this opportunity to deliver clarification on solid waste management in Pasir Gudang. For the information of Honourable Members, the Tanjung Langsat disposal site has 2 cells and now relies on 1 cell which has exceeded its capacity and operational capability.
Taking into account the needs of the people of Pasir Gudang, the Johor state government has decided to introduce the concept of Waste To Wealth (WTW), which will be implemented on a pilot basis at the said disposal site to meet existing needs. The decision to implement the pilot project will see strategic cooperation involving Darul Ta'zim Capital (PDT) and JBiotech, which is now at the stage of further evaluation of technological suitability and the robustness of business capital. The Johor state government is of the view that the WTW concept can and must be implemented at the Tanjung Langsat disposal site, based on an integrated and effective waste management system and capable of reducing the state government's cost burden.
Honourable Mr Speaker...
The call to prayer, Honourable Member. I think I ask EXCO to simply postpone, and continue in the afternoon. So we rest now. So, we meet at 2.30 pm.
The sitting was adjourned at 1.00 pm.
The sitting resumed at 2.30 pm.
Honourable Deputy Speaker presided over the sitting.
Honourable Members, the winding-up resumes. Honourable EXCO, Honourable Tan.
Thank you, Honourable Member, Madam Speaker. Madam Speaker, I shall now continue with my winding-up speech. I would next like to record my appreciation to the Honourable Member for Panti, who raised the matter of the former Bandar Tenggara disposal site. For the information of this honourable House, the disposal site operated while the Bandar Tenggara area was under the administration of the Southeast Johor Development Authority (KEJORA), and its operations were terminated after the Bandar Tenggara area came under the administration of the Kota Tinggi District Council. The Johor State Government takes seriously the fire incident that affected the surrounding air and, at the same time, disrupted school sessions in the area. Therefore, the State Government has acted through the Kota Tinggi District Council to control the fire at the site together with KEJORA. A long-term measure is also being implemented by the Kota Tinggi District Council, which has been submitted to the National Solid Waste Management Department (JPSPN) for the process of safely closing the disposal site. Meanwhile, KEJORA has taken a short-term initiative involving a third party through methane gas collection activities.
Madam Speaker, the State Government is also committed to reforming the local authorities (PBT). The main measure being implemented is digitalisation through the Johor state e-PBT system, based on 24 modules. The digitalisation of PBT is indeed a priority; however, its implementation requires care by taking into account the integrity of information in managing online services. I would also like to draw the attention of the Honourable Members to the e-Khidmat system, which was developed as a local portal and extends payments for PBT services, thereby facilitating direct interaction by the public and access to e-PBT services online. The e-PBT system was first implemented at the Johor Bahru City Council in 2016, followed by the Pasir Gudang Municipal Council, the Kulai Municipal Council, the Kota Tinggi District Council, the Pontian District Council and the Penggerang Local Authority, and it will be followed by the Iskandar Puteri City Council on 1 January next.
Therefore, I am optimistic that the e-Khidmat system will be fully implemented across all PBTs in Johor next year, by accelerating the use of all Johor PBT modules and carrying out the migration of information perfectly and in accordance with its standards.
Madam Speaker, the concern of the Honourable Member for Tenggaroh and the Honourable Member for Kahang over the management of crematoria during this sitting has drawn my attention to come forward to provide an explanation. I am pleased to inform the House that the crematorium built in the areas of the Segamat Municipal Council and the Labis District Council is expected to be completed and handed over to the management agency by the end of this year. The handover will be carried out as soon as the Johor State Government has discussed the policy paper on the direction of management of this first crematorium. By way of clarification, the crematorium was completed in 2018 but failed to operate due to an inadequate access road and the contractor's failure to complete the utility connection works. Therefore, this caring government leadership approved an additional allocation of RM1.15 million last September to resolve the problem.
Madam Speaker, the final matter that drew my attention during this sitting is the management of flash floods in the Johor Bahru city centre, raised through the debate by the Honourable Member for Puteri Wangsa. The Johor Bahru City Council is committed to overcoming the flash flood problem in the city centre, particularly along Jalan Trus; accordingly, a sum of RM10 million has been allocated for landscape beautification and upgrading of city centre infrastructure involving Jalan Abdullah, Jalan Ibrahim, Jalan Trus, Jalan Ungku Puan and Jalan Duke. The project, which commenced in July 2018, is expected to be completed by May 2020. It also includes upgrading works on a 400-metre drainage system along Jalan Trus. The State Government is confident that the ongoing upgrading works will decisively address the flash flood problem in the city centre.
Madam Speaker, thank you also for the concern and suggestions of the Honourable Member for Senai. The Johor State Government takes seriously the emergence of an increasing number of factories operating without premise licences in the State of Johor. This may be due to factories not complying with zoning or land use conditions. Therefore, the government will adopt an approach by holding discussion sessions with the relevant departments to overcome the problem of the emergence of factories without premise licences. For the time being, PBTs may consider adopting a more practical method, namely through approval of a Limited Planning Permission (KMT) under section 22(5) of the Town and Country Planning Act 1976, or as we often call it, Act 172, subject to the stipulated conditions. But specifically, the most important condition is that the activities of these factories operating without premise licences must not cause pollution to the environment or cause nuisance to the residents in the vicinity.
Madam Speaker, to conclude this winding-up speech, I would once again like to emphasise that the State Government today is committed to reforming local government, ensuring the well-being of the people and preserving the environment. Therefore, the support and backing of all parties, including grassroots communities, are very important in achieving that aspiration. On this occasion, I would like to record my heartfelt appreciation to the civil servants from every agency under the said portfolio who have worked tirelessly to help me carry out my work, carry out my responsibilities and also, what is it, help me prepare this winding-up speech. Thank you and congratulations on the services of you all.
With this, Madam Speaker, I conclude my winding-up speech today. May Johor continue to progress and prosper under the leadership of the Johor State Government of Pakatan Harapan. Thank you.
The House invites the Honourable Chairman of the Committee on Youth, Sports, Entrepreneurship Development and Cooperatives to deliver the winding-up speech.
The Honourable Member, Madam Speaker, thank you for this opportunity. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. First, in conjunction with the birthday of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan of the State and Territories of Johor Darul Takzim, who is the 61st, I would like to take this opportunity to pay my humble respects, to convey my deepest love, and to pray that Your Royal Highness is always in good health and able to lead the people justly and equitably.
The Honourable Member, Madam Deputy Speaker, it has been exactly one year since the first state budget of Johor under the Pakatan Harapan government was tabled and implemented. All the reports and programmes carried out under the 2019 Budget clearly show that the Pakatan Harapan government remains committed to governing, and its results can now be enjoyed by the people. I would also like to take this opportunity to once again congratulate the Honourable Menteri Besar of Johor, Dato' Dr. Sahruddin Jamal, on tabling the state budget under the theme "Memakmur dan Mensejahtera Johor Bestari". Heartiest congratulations and well done also to the State Economic Planning Unit of Johor (BPEN), the State Secretary, the State Financial Officer, the Local Authorities, the Members of the EXCO and their team, as well as all state agencies involved in preparing the budget this time. Johor is a symbol of attraction, with many proven histories of success. We thank you, and let us ignite the spirit and continue to serve.
The Honourable Member, Madam Deputy Speaker, the success of the Johor Darul Ta'zim team in bringing home the Malaysia Cup is the most important tonic for athletes and also the Johor SUKMA contingent. Heartiest congratulations I convey to the Johor State Football Association, the team management, the players, the coaches, and certainly to His Royal Highness the Acting Ruler, for this very proud achievement that all of us share. Indeed, indeed, sport unites the people regardless of political, racial or religious differences. And, this success will certainly inspire our young athletes who will compete in SUKMA Johor 2020 in the future.
For the information of this esteemed House, the preparations for SUKMA Johor 2020 have now entered the final phase, in which all preparations, including infrastructure, facilities, athlete training and event organisation matters, are actively and vigorously under way. Allow me to take this opportunity to provide a brief update on the current progress of the development of sports facilities for the 20th Malaysia Games, SUKMA ke-20, Johor 2020. And, as a record in this esteemed House, firstly for the new-build project, the first is Arena Emas, which will house the squash, archery, lawn bowls and also petanque venues. Currently its percentage of progress is 65.4%, and it is ahead by 0.4% in terms of its progress.
Second, the new-build shooting centre at Sportcity Mount Austin, Johor Bahru. Its percentage of progress is 49.44%, and it is slightly late by 1.2%. Next, the velodrome is at a progress percentage of 63.83%, which is ahead by 1.66%, and next is the athletics stadium and also the rugby stadium, both of which are located at Sportcity Mount Austin as well. If we look at the athletics stadium, the percentage of progress is 97.39%, slightly behind by 2.61% delay. Then the rugby stadium's progress status is 82.86%, behind or delayed by 17.6%. Then next is the water sports centre at Tasik Rekreasi Edu-hub Pagoh, which will house the canoeing events; its progress status is 10%, where it is ahead by 4%. Next is the KRAMSAU sailing centre, Bandar Penawar. Its progress status is 2%, which is ahead by 2%. Then the Indoor Stadium at Arena Larkin Johor Bahru will house badminton, 97%, slightly behind, a small delay of 3%. Then the Educity Football Plaza, its progress status is 56.8%, delayed by 0.3%. These are the statuses for the new-build projects. Meanwhile, for the SUKMA venue upgrading projects, the Aquatic Centre at Arena, Larkin, Johor Bahru, progress percentage status 97%, delayed by 3%; the warm up pool and also the timing system, progress status 2%, delayed by 3%; then the Johor Bahru Basketball Hall at Arena, Larkin, progress status 34.7%, which is delayed by 18.3%. Nevertheless, some are ahead and some are delayed. However, overall they are generally on good progress, and at the state government level, we want to ensure that at least 3 months before the SUKMA event takes place, we will be able to complete all the venues that I have just mentioned. Apart from that, I would like to give a brief updated status: the number of registered SUKMA volunteers is 7,249 persons, while the volunteers for the SUKMA athletes are 3,302 persons who have registered.
The Honourable Member, Madam Deputy Speaker, recently I made a visit to the training centres to see for myself the athletes' training, and I am very confident and believe in the capability of the Johor State Sports Council, which has provided comprehensive training since as early as 2018. With the commitment of the athletes and also the coaches throughout this training and preparation period, God willing, the Johor contingent's medal tally will be better than in SUKMA 2018. The performance of the athletes and teams is being closely monitored throughout 2019, and based on the current analysis, we set a target in this esteemed House, which I state as 40 gold medals; only then can we talk about becoming champions in the 20th SUKMA, Johor 2020. Among the sports that have the potential to bring medal returns to the Johor SUKMA contingent are athletics, swimming, canoeing and cycling, for which we will give our full attention to individual sports. God willing, I am very confident that with the remaining at least 8 months, our team will be able to add to the medal tally. Moreover, with the strong spirit and support of the fans and supporters for the athletes and the Johor contingent, we expect these young athletes' performances to reach their peak at this event. For that purpose, I urge all parties, from the ADUNs, the Members of Parliament, down to schools and families, to join hands in bringing supporters to attend and giving moral support to our Harimau Selatan team. The mission this time is a mission for victory, God willing.
The Honourable Member, Madam Deputy Speaker, the question I often raise, both in any interview sessions and so on, and even in this House previously, is the question: what after SUKMA? This is a relevant question that we must be conscious of, meaning. As I mentioned in the previous session in this esteemed House, the importance of organising a sports event such as SUKMA Johor 2020 cannot be denied. However, the real challenge is not only about organising the sports event, but rather the sustainable, systematic and comprehensive sports development plans that become the core and lifeblood for continuous development. What is the point of spending the people's money if it is only for a sports event and after that the sports infrastructure is left neglected and does not bring any benefit to the athletes and the majority of the people?
Therefore, I would like to take this opportunity to express congratulations and thanks to the Honourable Menteri Besar of Johor for agreeing to realise a new sports vision for the people of this state of Johor. This is my answer for those who ask "what after SUKMA", with permission, or in other words, what after SUKMA? This action plan is very important in ensuring that athlete development can be continued and enhanced. Moreover, it can become a new driver, with permission, in the socio-economic development of the people of the state of Johor. God willing, before long Johor will have, if I may say so here, its own Bukit Jalil in this state of Johor, God willing.
A comprehensive sports facility as the Johor Sports City will emerge, God willwilling, in facing the state's sports industry in the future. There are 3 main pillars in the Johor Sports Action Plan, or PTSJ, as the new driver of Johor's economy through the sports industry.
First, infrastructure and facilities. Are the current infrastructure and facilities insufficient? The fact is that in the projection of Malaysia's and Johor's population, the population rate is growing very rapidly. Therefore, the infrastructure and facilities that we have will not be able to cope with the high demand in the future. Apart from that, the infrastructure and facilities that will be built must be of high quality. For example, the velodrome currently being built has used expertise and technology from Germany and has been recognised by the World Cycling Federation. Our athletics field is also specially designed for athletics events, making it the only arena of its kind in Malaysia.
Apart from that, the infrastructure and facilities in the Johor Sports City are not only complete, but these facilities must also meet international standards. This is important considering the increasing demand for the hosting of prestigious sports events. This strategy can place Johor on the world sports map, which promises, God willing, a commensurate return on the investment made.
Second, the content of the Sports City, or Johor Sport City, is international-standard and prestigious sports events. This takes into account the strategic geographical advantage that Johor has, namely its proximity to Singapore and also Indonesia. Hosting world-class sports events can also become a sports tourism destination, or sport tourism, among the countries of Asia and also the world.
The third pillar is the aspiration to make sport a culture or a way of life among the families of the people of Johor. People who are active and fit in sports will become a catalyst for a generation that cherishes and prioritises a healthy quality of life, and moreover, interest in sports can be nurtured from a young age by parents who are active and also fit.
The Honourable Member, Madam Deputy Speaker, the youth development agenda. The Malaysia Youth Index (IBM) is an instrument that functions as an important indicator for us to see the development of the quality and well-being of our young people, especially in Johor. From this indication too, we will be able to see and better understand the role of young people in the social, cultural, economic and political contexts, which we see are changing at all times and in every era. The youth agenda is always an important and interesting topic to raise and discuss. Moreover, their role in a New Malaysia is very large and very influential.
The Honourable Member, Madam Deputy Speaker, based on statistics released by the Institute for Youth Research Malaysia (IYRES) for the state of Johor alone, the projected number of youths in 2020 is 1.7 million young people compared to 1.39 million in 2017. This number covers nearly 40%, or nearly 40%, of the population of the state of Johor. Certainly, when the new definition of the youth age limit that was amended recently is implemented in 2021, we will see a very significant increase in the number of young people in this country and also in this state. This number is a very large number to manage for all their needs. The youth group is a large workforce group with high productivity value.
In any country in the world, the development capacity of the young generation will have a direct impact on the economy, productivity, and consequently the gross domestic product, or GDP. However, recently it was reported on the findings of the Malaysia Healthiest Workplace Study by AIA Vitality 2019, with permission, in cooperation with the Rand Europe research agency and the National University of Malaysia (UKM), regarding the employment sector in Malaysia, which found that as many as 51% of workers in this country experience at least 1 dimension of stress involving their work, including insufficient sleep, very heavy workloads and financial problems. Apart from that, mental health is also linked to the level of work productivity. The study shows that 53% of workers in this country do not get sufficient sleep, namely at least 7 hours every day.
Apart from that, health problems are also a contributor to this situation. Workers in this country are also found to be less practising a healthy lifestyle, causing them to age before their time, or to age before their actual age. This is proven when 98% of workers were tested for age by AIA Vitality Age. Based on statistics on the level of youth mental health by state in Malaysia by the Institutes for Public Health, National Institut of Health, Ministry of Health Malaysia 2018, the youth of the state of Johor are placed in a category that is quite under control, with a depression or depression score of 14%, stress, with permission, 9.3%, and anxiety, with permission, as much as 37%. These mental problems are the cause of diseases such as schizophrenia, depression, and bipolar disorder, which, if not controlled or treated early, will lead patients to be inclined to commit suicide, nauzubillahiminzalik. And this must be avoided at all costs.
Based on all these scenarios, the youth are placed not only as a group that needs serious attention, but they are also the largest stakeholders in local socio-economic growth. Based on the IBM, the Malaysia Youth Index just now, there are 12 domains or clusters that need serious attention from the government and also agencies. So these 12 domains in turn have 4 main challenges for the youth, namely politics, social, economic and also technology.
The Honourable Member, Madam Deputy Speaker, from these 12 domains and 4 challenges, we conclude that the focus of the Youth Development Policy for the state of Johor next year will be on enhancing the capacity of young people in the fields of economy and entrepreneurship, technology, creativity and leadership in society. Referring to the performance of the programmes carried out in 2019, a total of 125 programmes have been successfully implemented in every district in the state of Johor, and of this total, around 27,730 young people have participated and benefited from these programmes. This is an increase of 25.5% compared to 2018. Heartiest congratulations I convey to the Institute of Leadership Integrity and Dato' Onn Spirit Training (IKLAS) and the Johor Youth Development Centre (JOYDEC), which were very committed in successfully carrying out all these programmes.
The Honourable Member, Madam Deputy Speaker, we move on to the agenda of entrepreneurship and cooperatives in the state of Johor. Throughout 2019, the government has implemented all the initiatives for the development of entrepreneurs and cooperatives in the state of Johor, and the impact received has been very encouraging, although the world and national economic situation is somewhat sluggish. From these programmes, the government has identified the weaknesses and strengths of our local entrepreneurs. I am very grateful for the efforts carried out by all agencies, particularly under the Johor State Entrepreneur Development Council (MPUNJ). The organisation of entrepreneurship programmes throughout 2019 has succeeded in attracting around 85,000 visitors, and as many as 2,829,000 local entrepreneurs have participated in them. For the micro-entrepreneur segment under the Small and Medium Industries (IKS), this is a very proud figure. Meanwhile, the state and federal agencies involved number 37 institutions, in which a total of 145 product matching sessions involving 79 companies have been successfully implemented. The matching segment covers creative products, agricultural products, decorations, food and beverages, health products and service-based businesses. The estimated value of the output of this matching is RM9.491 million. This amount will be able to be further enhanced next year
given that the state of Johor will organise SUKMA 2020 and Visit Johor Year 2020.
The Honourable Member, Madam Deputy Speaker, the wise and learned, the Youth Entrepreneur Roadshow carried out for 3 months in every district has succeeded in gathering nearly, has succeeded in gathering nearly 1,500 young people and around 500 young entrepreneurs in each district. This means that on average, in each district we have at least around 50 young entrepreneurs. From the townhall sessions, with permission, this roadshow series, we learned that these young entrepreneurs have talents and ideas that have the potential for us to help and develop. From these findings, the Local People Grant, or GOL, initiative was implemented by Johor Entrepreneur Corporation Sdn. Bhd. (PUJB), where this grant is a special assistance for the purchase of equipment or tools for young entrepreneurs who need them. This assistance is provided through several segments that suit the demographics of local entrepreneurs, such as machines related to the manufacturing sector, needs, such as machine needs in the field of fashion design or crafts, machines related to the automotive field and metalwork such as welding, cutters, as well as machines related to printing materials, machines related to audio-visual production including building websites, with permission, for start-up companies, with permission, and also machines related to beverage and food products.
A total of 1,500 applicants have been received, which on average, if divided, would cover around 150 entrepreneurs from each district. This is a encouraging indication; however, we are aware that this number is rather difficult for the state government as a whole to accommodate. Therefore, as in the budget speech of the Honourable Menteri Besar recently, the state government will add to and implement the Local People Grant 2.0 next year in order to ensure that no young entrepreneur is left behind.
Following the Johor State Cooperative agenda for 2019, we have succeeded not only in implementing the Young Entrepreneur Resolve Programme at state level, covering four zones as a screening in all state schools in Johor, but we have also succeeded in bringing these young talents to the national level as exposure, and we have succeeded in obtaining third place overall at the national level in the Young Entrepreneur Strive For Success (YESS) competition recently. Heartiest congratulations I convey to the MRSM Batu Pahat Cooperative; congratulations I convey to the younger siblings, or the school students, who succeeded. We believe that the achievements gained at this time will become a great motivation and inspiration to all students who are young entrepreneurs, children of the state of Johor. For this success, the government is committed to improving and continuing this initiative next year. Based on the compass of the National Entrepreneurship Policy (DKN), which aims to make our country an entrepreneurial nation, the state government is committed to becoming champions in this mission by continuing and improving all programmes and training under the Entrepreneur Development and Cooperatives portfolio. Among the basic matters that are further improved are policies and the implementation of policies at department level and at Local Authorities, which will benefit not only entrepreneurs but all the people of Johor.
Next, the state government will also emphasise more systematic monitoring in all implementing agencies under MPUNJ so that we can ensure all government resources can be optimally utilised for our entrepreneurs. The Johor Entrepreneur Data Centre (PDU) will be established. The focus of the programmes will be given emphasis on the addition and creation of employment opportunities. This will be the main goal of the state government for the year 2020.
The Honourable Member, Madam Deputy Speaker, the kind-hearted, God willing, I am nearly at the end of this. I would like to summarise my winding-up speech by looking back at the core matters that have been raised. I would like to reiterate here our main target in SUKMA Johor 2020, which is to be the best host, where the task of being the best host is not only the responsibility of the organisers but also the response of the people to this event. We want all parties, from athletes, contingents, government, private sector and the people, to benefit from this event. I would also like to inform here that if there are Honourable Members who wish to make visits to the SUKMA venues that we have developed, I very much welcome it. God willing, we can plan together, whether the People's Representatives on the opposition side or the government side, we can jointly arrange a visit to the SUKMA venues. Interestingly, all Honourable Members can see it later, God willing. The Johor youth agenda will certainly become a catalyst for the success of the state in the future. Therefore, the sustainability of youth development will always be monitored and further enhanced. The creation of new jobs based on self-reliant skills will be prioritised. We know that the young people of Johor have great talent, and we do not want any youth group to be left behind. Youth are partners of the government; the government will not progress if it does not have partners as close as our youth. And for that, I invite all young people to step forward and take this opportunity to advance themselves and also our community. In the aspect of the development of entrepreneurs and cooperatives, our priority is to continue the agenda of empowering entrepreneurs and our young talents in business in various aspects, whether training, financial assistance, facilities and also infrastructure. I very much hope that local entrepreneurs will adopt a positive attitude and always want to advance themselves, do not wait for assistance to arrive, but instead do not wait for assistance to arrive, but rather move forward to explore all the opportunities that exist. With this I conclude, Assalamualaikum warahmatullahi wabarakatuh.
The Honourable Chairman of the Committee on Islamic Affairs, Agriculture and Rural Development, please come forward.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahitaala wabarakatuh. Greetings of happiness and peace. Madam Speaker, and Members of the House. First of all, I would like to respectfully offer my heartfelt thanks to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan of the State of Johor Darul Ta'zim, on the occasion of His Royal Highness's birthday. On behalf of all the people of the DUN Bukit Permai, I respectfully offer my greetings and pray that Allah grants His Royal Highness continued well-being in ruling Johor in peace, prosperity and happiness. Madam Speaker, if I speak less, with less enthusiasm, I ask for your forgiveness, because I had little sleep last night. I could not sleep because I kept thinking about what Penawar said yesterday afternoon. (House laughs). I could not sleep, Speaker, it was difficult for me.
Madam Speaker, among the matters raised by fellow Members of the House, such as Sungai Balang, is the allocation of as much as RM41 juta, including special assistance by the state government, particularly to the welfare bodies of state religious schools in Johor. If we call the religious schools' bodies welfare bodies, Madam Speaker, at the national school level they are known as PIBG. For the information of the Honourable Member, the allocation of RM41 juta for the development and rehabilitation of state government religious schools in Johor does not include the special assistance by the Johor state government, particularly for the welfare bodies of religious schools (BKSA) throughout the State of Johor. For 2019, the government provided assistance to these BKSA on a one-off basis, to 576 state government religious schools in Johor, namely SAKJ, and 5 additional schools, namely the Johor state government secondary religious schools in Kluang, Maahad Johor, Maahad in Pontian, SMA Parit Raja and SMA Bugisiah in Benut, where the total allocation of RM2,880,000.00 was given in bulk at RM5,000.00 for each school. For Budget 2020, the government has channelled the BKSA allocation to SAKJ in the State of Johor. In addition, the Johor Islamic Religious Council (MAIJ) in 2019 allocated RM1,916,000.00 for 570 SAKJ according to the grade of the school. For grade A, 50
schools totalling RM250,000.00; for grade B, 88 schools totalling RM438,000.00; for grade C, 440 schools totalling RM1,320,000.00.
Madam Speaker, I thank the Members of the House for their feedback on matters relating to the development of religious schools. And, God willing, according to the planning phase for the development of religious schools at this fifth level, which will be taken forward by KPRJ (Kumpulan Prasarana Rakyat Johor) through its subsidiary KPRJ Builders, implementation will begin in 2020.
Madam Speaker, in addition, one of the programmes being planned by the Council under my initiative is to give new life to the Al-Quran Cultivation Programme. One of the major plans for 2020 is that we will implement the Al-Quran Cultivation Programme by state constituency (DUN). Each DUN will launch this Al-Quran Cultivation Programme, and God willing, the Al-Quran Cultivation Programme will become an inspiration to all DUNs in the State of Johor. As we are planning it, we will take a time, either after Asar prayers or after Maghrib prayers, and all DUNs will select one mosque. We will recite one surah simultaneously throughout the State of Johor, in the same time frame for every DUN in the State of Johor. It is hoped that this programme that I have conceived, to raise the glory of Islam, will receive the support of all Members of the House in the State of Johor, whether on the government side or on the opposition Pakatan side.
Madam Speaker, in addition, regarding the issues involving schools, the new Johor religious school syllabus, as suggested by my friend from Panti, that if possible the KIJ syllabus, namely the Johor Islamic Sultanate, be integrated into national schools. For the information of the Honourable Member and Members of the House, KIJ or the Johor Islamic Sultanate is only used in Johor state government religious schools. It cannot be used in national schools because it would likely conflict with the school syllabus policy of the Ministry of Education and the Johor State Religious Schools Education Division. Nevertheless, this syllabus will also be beneficial to students at the national school level because, in my view, it can be said that almost 100% of students in national schools are also students in Johor state government religious schools.
Madam Speaker, the number of pupils as requested for Johor state that attended school in 2019 for Johor state government religious schools totalled 184,365 persons; for SRAB schools totalled 3,565 persons; for Special Classes (Darjah Khas) totalled 15,477 persons. The total number of pupils at religious school level in the State of Johor is 203,407 persons. This means, indirectly, Madam Speaker, that pupils in Johor state government religious schools, national schools and Form 1 secondary schools will learn the KIJ subject directly and indirectly.
For KAFA teachers, I extend my congratulations. Starting from 2020, the government has approved 240 teachers to teach four and a half hours, involving additional costs totalling RM1,670,400.00. The total of those teaching four and a half hours for 2020 is 2,090 persons. JAKIM (Department of Islamic Development Malaysia) has also increased the rate of allowance for KAFA teachers by RM100.00 for each person, namely the allowance from JAKIM, RM900.00 plus RM100.00, totalling RM1,000.00. The allowance from the Johor state government is RM512.00, so the total allowance is RM1,512.00 for each person. Per month for each person.
Madam Speaker and also Members of the House, information on Johor Islamic Kindergarten (TAJ) teachers. Alhamdulillah, the government has focused on upgrading the grades of Johor Islamic kindergarten (TAJ) teachers, totalling 519 persons. The existing TAJ teacher warrant total is 316 persons; upgrade to the new grade S19 totalling 316 persons; additional new teachers upgraded to S19 totalling 46 persons; the total overall expenditure for this requirement, 316 plus 46 multiplied by 36 persons per year, is RM10,509,516.00.
Madam Speaker, the government is also considering how to rehabilitate matters concerning mosques and surau that need repair assistance. For this purpose, as announced in the budget by the Most Honourable Menteri Besar of Johor recently, the budget for the repair of surau and mosques: any Honourable Member who has a problem with damaged mosques or surau may submit this application directly to the state government through me, and a copy of this application must be submitted to the District Kadi's Office so that I can consider it. In determining the repair of mosques and surau, I give assurance to the Honourable Speaker and this august House that the Pakatan Harapan government will meet requests as far as possible, regardless of the party they come from, in our effort to raise the glory of Islam, and God willing, if there are applications from Members of the House on the opposition side, I will consider them carefully, God willing.
Madam Speaker, regarding the problem of additional schemes requested by the Honourable Member for Kempas, that the zakat authority consider buying houses using zakat money. For the information of the Honourable Speaker and Members of the House from Kempas, my friend the Honourable Dato' Haji Osman bin Sapian, yesterday I also met with officers at the level of my portfolio, and I asked the Johor State Economic Planning Division (BPEN), the Johor Economic Planning Unit, to consider this matter and to meet with the Johor Islamic Religious Council (MAIJ). In principle, MAIJ welcomes this proposal, and God willing, it is hoped that it will become a reality.
Madam Speaker, as requested regarding the distribution of zakat matters. Recipients of zakat assistance schemes, provision of assistance from January to October 2019. Monthly living assistance, distributed in the total amount of RM61,628,000.00 involving 16,014 persons. Hari raya assistance of RM8,224,350.00 involving 66,275 persons. Natural disaster assistance of RM157,400.00 involving 232 persons. Dialysis treatment totalling RM40,973,378.72 involving 467 persons. Various medical, one-off, RM2,489,700.03 totalling 474 persons. Monthly assistance of RM17,308,261.94 totalling 3,169 persons. Heart patient assistance, IJN, RM637,865.75 totalling 119 persons. Other assistance in the form of education, school fees, RM1 juta involving 10,000 students. School uniform assistance, totalling RM3,727,705.00 involving 33,860 students. IPT registration totalling RM1,983,200.00 involving 2,615 persons. That is some of the distribution of asnaf categories that have been provided in the past.
For the information of the Members of the House who raised the problem of the Kampung Lubuk Batu Segamat mosque: the central government had initially approved an allocation of RM2.6 juta in 2017. However, I was informed that the allocation was cancelled and there was no new approval until last year, 2018. I have asked the Mosque Management Division to look into this matter, so that if it is true that the RM2.6 juta allocation has been approved, we will appeal to the central government so that this allocation can be expedited for the upgrading works of Masjid Makam Lubuk Batu in Segamat. Likewise, for Masjid Lukmanul Al-Hakim in Kampung Kelantan, Kota Tinggi, the central government approved an allocation of RM2 juta in 2017. Then it was cancelled, and finally received approval of RM500,000.00. The actual cost is RM1.7 juta. This additional cost requires a state government commitment of RM1.2 juta to implement this project.
Madam Speaker, other matters regarding special fishermen assistance, as raised by the representative of Seri Medan, Panti and also the representative from Mersing.
I thank you. And for information, as already informed, under the 2019 fishermen assistance for the Southern Johor area, it has been handed over to a total of 1,513 fishermen. I have also been asked to convey the problems of these fishermen's voices if possible, as the Members of the House requested, that if possible, fishermen in the East Coast area such as Pengerang and Mersing, and fishermen areas on the West Coast such as Muar and Batu Pahat, be given attention regarding this RM1,000.00 allocation assistance. I have already informed the officers of the State Economic Planner, and God willing, a proposal paper will be prepared to be brought to the state government to consider the problem of demands from fishermen in the East Coast zone and West Coast zone.
Madam Speaker, in terms of the Johor State Veterinary Services Department, in its short-term and long-term plans, the Veterinary Department has planned the development of a state poultry and livestock meat hub for the period 2021-2025, namely the Twelfth Malaysia Plan (RMK-12). This plan covers 6 main strategies:
1. Increasing the population of ruminant meat animals. 2. Encouraging modern technology. 3. Developing Segamat Agrovet as a one-stop marketing centre. 4. Improving livestock health. 5. Improving the quality of animal services. 6. Improving animal breeding programmes.
For this, the programme marketing network, scheduled livestock auctions once every 3 months, Honourable Speaker, will be held at Agrovet Segamat. Introducing the concept of a meat shop, with permission, and also a prime card, with permission. The permanent farmers' market concept will also be held every week, with clearance sales at the end of every month. This programme will begin in 2020.
Madam Speaker, one of the Veterinary Department's long-term plans, together with the state BPN and ECCR, is to set up the largest dairy cattle farm in the State of Johor, covering an area of 2,500 acres in the Mersing district. If this succeeds, the project is expected to begin in 2021, and Johor will become the largest producer of dairy cattle in our country.
Regarding the suggestion of the Honourable Member for Semarang, my friend, on how to increase the yield of animal feed. A project to plant sago palm as livestock feed has also been planned at the TKPM, Kampung Tol Permanent Food Production Park, Bukit Kepong. Considering that the area is swampy, and applying the method that has been implemented at the Buffalo and Deer Research and Breeding Centre in Telipok, Sandakan, Sabah. It is hoped that the wish of my friend from the Honourable Member for Semarang for Johor to produce feed for livestock can be achieved. God willing.
Madam Speaker, other matters in terms of commodities produced at our level by the Johor State Veterinary Services Department. For commodities in 2019, beef and buffalo meat, total metric tonnes of 4,787,095 metric tonnes, value RM105,334,900.00. For beef and goat meat, 98.75 metric tonnes, total trade value RM2,962,500.00. Chicken and duck meat, chicken and duck meat, 426,912 metric tonnes, total trade value RM1,852,934.60. For other livestock meat, total metric tonnes of 23,312,000. Total trade value RM163,296,037.60. For chicken and duck eggs, total metric tonnes of 191,375 metric tonnes, total trade value RM1,128,553.769.
And I also hope that any entrepreneurs who intend to run chicken farms, in accordance with state government decisions, all applications for chicken farming must be in a closed housing system.
Madam Speaker, in terms of the Department of Agriculture, I take a very firm commitment. That for any permanent farms or food production under the Department of Agriculture that are not being cultivated by those who have been given the opportunity, I have already asked the Department of Agriculture to give them a final 3-month period, after which those who do not make an effort will be removed from the list as participants in the Johor State Department of Agriculture Permanent Food Production Park. However, I am very confident in our commitment to the green revolution. As I have suggested, it is hoped that this will become a paradigm shift for farmers in the State of Johor.
For the information of the House, I am not speaking empty words when I say that the first Green Revolution Concept Plan at FELDA Ulu Tebrau has already secured 30 acres. Participants from the settlers through the cooperative have been given pineapple MD2 planting projects. For the project to make Johor a black pepper hub again, a total of 16 participants have already been selected at FELDA Inas, covering an area of 10 acres, as black pepper planting participants in the State of Johor.
Madam Speaker, that is a brief summary of what I can suggest to the Honourable Members. It is hoped that the Honourable Members and we can work together, and I congratulate the Barisan Nasional party on its victory in the Tanjung Piai Parliament. I accept it with an open heart and a big spirit. It is hoped that my colleagues in the government also have big hearts. Consider this a challenge, and God willing, we will quickly rectify our weaknesses. Let us identify what the people want, so that God willing we will return as a major force in the State of Johor and at the federal level as the Pakatan Harapan government party (House applauds).
To the Honourable Penawar (House laughs). Honourable Penawar, I could not sleep last night.
Happy or sad?
Honourable Penawar, Encik Anuar went to Rasau, sheltering under a sena tree. Penawar, do not feel worried, if fate is meant for you, it will not go anywhere. (House laughs and applauds).
To Penawar too, riding in a car while hooking, sitting down to a breakfast of serati duck, though there are a million stars in the sky, the star of Pakatan Harapan remains in the heart. That is all. Wabilahitaufik walhidayah wasalamualaikum warahmtullahi wabarakatuh. (House applauds).
The Honourable Chairman of the Committee on Unity, Domestic Trade and Consumer Affairs, please come forward.
Thank you, Honourable Madam Speaker, Honourable Members, greetings of peace and hope. First, I respectfully extend my warmest congratulations and pray that His Majesty the Sultan of Johor remains in good health, well-being, happiness and blessings on the occasion of His Majesty's birthday on 22 November 2019.
Congratulations also to the Most Honourable Menteri Besar and my fellow members of the Executive Council, the State Government Executive Council, and the state civil servants of Johor, who have succeeded in preparing a budget with the theme "Memakmur dan Mensejahtera Johor Bestari", which we believe will ensure that the state of Johor continues to develop as a progressive and sustainable state. I also take this opportunity to congratulate the JDT team for winning the Piala Malaysia.
Madam Speaker, the issue of TABIKA Perpaduan. Honourable Kahang raised this issue in his debate speech, expressing the view that TABIKA Perpaduan needs better progress.
Madam Speaker, at present there are as many as 206 TABIKA Perpaduan classes operating throughout the state of Johor. The main objective of establishing TABIKA Perpaduan is to provide early childhood education for children aged between 4 and 6 years, so that they may appreciate the values of unity, live in society, and prepare for school life later on. It cannot be denied that unity must be nurtured from childhood, and TABIKA or TADIKA is the most important nursery. Recognising this fact, various initiatives have been taken by the government, particularly through TABIKA Perpaduan, towards producing a generation with a strong patriotic spirit and unity. In this effort, one of the most important aspects is the provision of TADIKA classes with a conducive, cheerful, safe and comfortable environment for children to learn and play. The government has always given important emphasis to this matter and has taken appropriate steps to improve the infrastructure and cheerfulness of TABIKA Perpaduan classes. It has long been a priority of the government to increase the participation of children of multiple races in TABIKA Perpaduan. This is because TABIKA Perpaduan focuses on instilling the values of unity at the childhood level, and it is hoped that they will become quality citizens to meet the excellence of the nation. Therefore, apart from infrastructure, the Department has also taken several other initiatives to improve the performance and excellence of TABIKA Perpaduan, in order to provide the best early childhood education while promoting TABIKA Perpaduan to a multiracial society. For the information of Honourable Members, some of these initiatives have been implemented with the support and allocation from the state government under the Johor Hope Plan Programme 2019. Among them are:
1. Carrying out seminars, courses, workshops and training continuously for teachers and assistant teachers to enhance their level of professionalism.
2. This year the Department has introduced the Scholars' Club Programme (KLIK) or, in short, KLIK, which integrates all activities promoting reading, academic and non-academic activities, sports and also social activities.
3. Implementing star ratings, with permission.
4. Implementing the Creative Excellence Programme at state and district levels, which aims to discover the talents and potential of TADIKA teachers and children, in order to produce creative and innovative teachers and children.
Therefore, the proposal will also be continuously taken up by the state government together with the Department of Unity to appoint more qualified workers of various races as Teachers and Assistant Teachers at TABIKA Perpaduan. For the information of the House, the state government has also allocated RM1 million for this purpose.
The second issue is the issue of the inverted flag. Honourable Layang-Layang raised this matter in a supplementary question. The issue of inverted flags, and recently also the issue of the five-star flag, as well as improper flag display, are among the issues constantly monitored by the Department of Unity. When this issue occurred in August last year, all officers and KRT were directed to monitor the issue of inverted flag display in their respective districts, and several cases detected, such as in Johor Bahru, Kluang and Batu Pahat, were reported to Headquarters. The Department has also verified the issues that occurred. However, the Department of Unity does not have any power to take any legal action against the parties involved. This is a security matter. But the Department of Unity, together with the state government, will take an approach to ensure that the parties involved always follow the correct rules. As a step to address this issue, the Department will implement an Awareness or Sensitivity Programme for the public on the correct display of flags. Therefore, I sincerely hope
that all parties will take this flag issue seriously and together ensure that this matter does not recur. The flag is a symbol of sovereignty and a spirit of patriotism to our nation. Fifty-one years... [sic] Sixty-one years after our nation achieved independence, the spirit of unity and patriotism towards the nation should definitely be strengthened. As Malaysians, let us stand shoulder to shoulder and bear the responsibility to defend the sovereignty and unity that we have achieved together all this time. I appeal to the Honourable Members present in this House: let us make unity a culture, and not politicise unity, and also celebrate diversity.
Thirdly, Madam Speaker, the issue of the cost of living. Most Honourable Members have raised the issue of the cost of living. Honourable Benut, Honourable Kahang, Honourable Penawar, Tangkak, Bukit Naning, Pemanis, Senggarang, Larkin and Honourable Maharani have raised the issue of the cost of living. The cost of living is an issue that has always existed at all times and in all countries. This is an issue that we have to handle, but this is not so easy. Many matters are involved in this issue, namely, one, the cost of goods is influenced by the value of currency, supply and demand, weather and so on, several factors. Therefore, multi-sector agriculture is very important in handling the cost of living.
Therefore, Madam Speaker, this issue is very broad and involves all sectors of society and all government agencies, and the increase in the cost of living covers various aspects. Among them are the cost of housing, the cost of food, the cost of healthcare, the cost of education and also the cost of transportation. So, this is a very wide area and field. We need a comprehensive way of handling it. So, for this reason, the Pakatan Harapan government has also established the Special Committee on Managing the Cost of Living, chaired by the Most Honourable Deputy Prime Minister, and which is also responsible, and placed under the Ministry of Domestic Trade and Consumer Affairs (KPDNHEP) as the main secretariat, as an initiative to increase the effectiveness of government efforts in ensuring that the prices of goods do not rise too high, in addition to enforcing laws relating to price increases of goods. This committee constantly discusses various strategies in an effort to improve the living standards of the people. Among the functions of the committee is to study the chain or distribution of these goods, which begins from the producer stage, plantation, importer, to the wholesaler and then to the final stage, namely the retailer. The report of the study has been submitted to the Secretariat of this Committee at the KPDNHEP level at the centre. This study involved the participation of all KPDNHEP offices throughout the country in general and 8 KPDNHEP state offices in Johor in particular. This covers the basic necessities of Malaysians in general and the people of Johor in particular.
Here I would also like to introduce an application called Price Catcher. Price Catcher is a smartphone application to make it easier for consumers to obtain price information on basic necessities at selected premises. This application also ensures, makes sure, that the people continue to get supplies of goods at the lowest prices, involving major supermarkets, supermarkets and mini markets throughout the country. Consumers can make price comparisons between nearby premises or supermarkets and share that information via social media platforms. Through this application, consumers can also receive information announcements directly from KPDNHEP, for example announcements of retail petroleum prices, scheme prices, maximum prices, festive seasons and so on. The government, together with KPDNHEP Johor state office, will continue to intensify enforcement activities, especially on the issue of prices of goods and services, so that traders do not arbitrarily increase prices just to obtain excessive profits. So, I request that consumers use this application, Price Catcher, where all price information for goods throughout Malaysia is available. So, consumers can become wiser in their choices.
Apart from that, the state government, in the 2020 Budget, has also implemented several special initiatives to reduce the burden of the rising cost of living. Among them are:
1. The Food Bank Programme, which will be implemented throughout the state of Johor by supplying daily food necessities to the B40 group and recipients of e-Kasih aid, asnaf and recipients of the Department of Social Welfare, which is believed to ease the burden of their lives. So, the state government has allocated a total of RM600,000.00 for this programme. This programme is to save surplus food and distribute surplus food to the poor who live in PPR flats or villages, including university students. They too have called for this assistance.
2. Free Water Scheme of 10 cubic metres. This is one of the manifesto promises of Pakatan Harapan. This promise has also been fulfilled.
3. Johor Health Card.
4. A RM1,000.00 voucher for buyers of affordable homes, which eases the cost of moving into a new house.
5. Special Aid to fishermen, which was recently distributed.
6. Incentive Aid to B40 students.
7. Exemption from advertising licence fees. All of these are from the Johor state's 100-day manifesto.
8. Takaful Scheme for Senior Citizens.
9. Johor Caring Housing Scheme.
10. Johor Youth Housing Scheme.
11. 20% Reduction Discount and also expansion of the Johor Muafakat Bus service and the Free Ride Bus Programme.
These are all programmes to help the poor manage the cost of living. Apart from that, the Pakatan Harapan State Assemblymen also have allocations for distribution, and the Members of Parliament also have allocations for distribution. So, there are many ways the government helps the poor people, to manage the cost of living.
Madam Speaker, the fourth issue is the question of whether sales carnivals can address the problem of the cost of living, raised by Honourable Pasir Raja. The organisation of the Johor Mega Sales Carnival is a continuation of the Johor Trak Festival 2015, the Johor Mega Sales Carnival 2016, the Muafakat Johor Mega Sales Carnival 2017 and the Muafakat Johor Mega Sales Carnival 2018. All these programmes received very encouraging responses, especially in fostering a culture of smart consumerism as well as sales at reasonable prices, namely a variety of goods directly from factory to consumer. Therefore, the Johor state government intends to organise the Johor Mega Sales Carnival 2019 in addressing the cost of living and the well-being of the people, while also fostering a capable consumer community.
The concern of the Johor state government regarding the cost of living continues to be translated through the proposal to organise a carnival in the form of fair-priced sales and exhibitions as one alternative to reduce the burden on the people. This carnival is a signature event of the Johor government for the consumer sector and at the same time creates synergy between government agencies and traders as a choice for the public to spend at reasonable prices. This carnival is conceptualised as a combination of direct sales from factory, factory-to-, and direct involvement with consumers. Indirectly, this carnival can also create awareness among entrepreneurs, producers and industries to take part and support the government's efforts in helping consumers reduce the cost of living. This carnival also emphasises outreach and impact on the people and consumers by offering a variety of basic and daily necessity products at promotional prices. Consumers have the opportunity to buy directly from producers without going through various layers of business such as wholesalers and retailers, and to obtain information and knowledge from various government agencies that take part in this carnival.
Honourable Madam Speaker, the fifth issue raised by Honourable Kahang, namely PIBG and LPS in Tamil schools. There are many now.
EXCO, let us leave this to the EXCO for Education.
Okay, good, thank you. And also one more, number six, which is the involvement or community leaders who come to my office. I always encourage change in community leadership, because previously they were in government and now they are in the opposition. And many of them are involved in welfare. So, when they come to meet me, I always ask them to get involved in more meaningful activities for the community, such as skills, transfer of new knowledge and so on. Not only welfare. So, I see that the old NGOs who meet me are always involved in welfare. So for this reason I told them to change the leadership of the NGOs.
The last issue, Madam Speaker, is the issue of the Indian community's charitable burial ground, raised by Honourable Tenggaroh.
Honourable EXCO Rama, that natural resource matter is under the authority of the Menteri Besar, so we return it to the Menteri Besar to answer.
Okay, good, thank you. That is all my speech, my winding up, thank you.
Honourable Members, I shall suspend this sitting until 4.05 p.m. for a break.
The sitting was suspended at 3:50 p.m.
The sitting resumed at 4:05 p.m.
Honourable Members, the sitting has resumed. Honourable Chairman of the Select Committee on Health, Culture and Heritage, you may proceed.
In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh, Salam Sejahtera and Salam Harapan Johor. First, I thank the Honourable Speaker for giving me the space and opportunity to join the debate winding up the Budget 2020, which was tabled by the Honourable Menteri Besar last Thursday. On this occasion, your servant wishes to convey the warmest congratulations and the official birthday greetings for the 61st year to Duli Yang Maha Mulia Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Ta'zim, on 22 November 2019. Daulat Tuanku.
I am also pleased to convey my highest congratulations to the state government administration under the leadership of the Honourable Menteri Besar Dato' Dr
Sahruddin Haji Jamal, who tabled the Johor state budget for 2020 under the theme "Memakmur, Mensejahterakan Johor Bestari", outlining six main strategic pillars, namely Mensejahterakan Rakyat, Memakmurkan Ekonomi, Melestarikan Alam Sekitar, Membangun Modal Insan and Memperkasa Syiar Islam, together with two other pillars, which are Mengukur Jati Diri and Membuka Warisan Budaya, as well as Menambah Baik Tadbir Urus Dengan Cekap dan Berintegriti.
On this occasion, I would also like to express my thanks and appreciation to the Honourable Members who put forward proposals, views and criticisms relating to the departments and agencies under the portfolio of the Health, Culture and Heritage Committee. I receive every feedback given with an open mind and evaluate each one so that it receives attention for the well-being of the people in this state.
Honourable Madam Speaker, in answer to the question raised by the ADUN Panti regarding hemodialysis centres across the whole state and how many there are in each district, and how the expansion can be implemented, particularly in rural areas. For the information of the Honourable ADUN Panti, in the state of Johor there are 11 government hospitals and two community dialysis centres under the supervision of the Ministry of Health Malaysia (KKM) that provide hemodialysis treatment services. There are also four hemodialysis treatment centres under the management and supervision of other government agencies. In addition, there are 91 private hemodialysis centres operating in the state of Johor. Two hemodialysis centres under the supervision of the Ministry of Health Malaysia (KKM) have begun operating in Simpang Renggam, Kluang and Bandar Mas, Kota Tinggi. One hemodialysis centre at FELDA Tenggara 2, with a capacity of 10 dialysis machines, is in the process of project implementation for the residents nearby.
Regarding the implementation process of the hemodialysis centre at FELDA Tenggara 2, the KKM has appointed a contractor, but the physical construction has not yet been carried out. The current status is being finalised, the room requirements, namely the data room, walk-in interaction, and the expected start of work in 2020. Apart from this project, the Ministry of Health Malaysia (KKM) has no plans to implement the same project in other areas of the state of Johor. However, the Ministry of Health Malaysia (KKM) invites interested and qualified private companies or NGOs to provide this service for residents in rural areas. The following is the breakdown of government, private and NGO hemodialysis centres by district. Johor Bahru - 34, Kulai - 6, Muar - 11, Tangkak - 6, Batu Pahat - 15, Segamat - 7, Kluang - 11, Pontian - 7, Mersing - 3 and Kota Tinggi - 8.
New applications for the establishment of private hemodialysis centres that are not yet operating are as follows:
1. Hospital Pakar Kencana. 2. KPJ UTM Specialist Hospital. 3. KPJ Batu Pahat Specialist Hospital. 4. KPJ Kluang Specialist Hospital. 5. KPJ Pontian Specialist Hospital.
Honourable Madam Speaker, in answer to the question raised by the ADUN Buluh Kasap regarding the status of the construction of the Palong Timur Health Clinic, following the earlier report that an allocation had been approved in 2017. For the information of the Honourable Member, the Type 5 Health Clinic project with quarters at Palong Timur, Segamat, was approved under Rolling Plan-4 of the Tenth Malaysia Plan. The implementing agency for this project is the Johor Public Works Department. The tender advertisement was issued on 1 April 2019, the tender briefing and site visit were held on 8 May 2019, and subsequently the tender closed on 10 June 2019. The tender evaluation for this project has been completed and has been submitted to the Tender Board for deliberation. However, the issuance of the letter of acceptance (SST) was deferred until the As Tendered Detailed Abstract (ATDA) is approved. There is a cost increase for the Type 5 Health Clinic project
with Quarters at Palong Timur, Segamat, compared with the Preliminary Detailed Abstract (PDA) cost that was approved earlier.
At present, the application for the project cost increase is being examined at the level of the Ministry of Health Malaysia (KKM) before being submitted to the Ministry of Economic Affairs (MEA) for consideration and approval.
For everyone's information, I also received a question regarding the Pasir Gudang Hospital, which was answered by the EXCO for Public Works. Therefore, I, as EXCO for Health, will continue to monitor the construction of these projects from time to time and will ensure that they are completed within the stipulated time.
Honourable Madam Speaker, next, regarding the proposal of the ADUN Bentayan, who proposed that the government establish a new method as a solution and improvement to the management system of the Kad Sihat Johor. For the information of the Honourable ADUN Bentayan, the government has made improvements for 2020. Accordingly, the financing limit for individual category B has been raised from RM200.00 to RM350.00, while the financing limit for the family category is maintained at RM500.00. Regarding the proposal to introduce a paperless concept, the government will consider and make further improvements to make it easier for recipients of the Kad Sihat Johor. The method of registering for the Kad Sihat Johor can be done online at www.sihatjohor.com.my. However, applications by manual means are still accepted to facilitate applicants who do not have internet and computer facilities.
Honourable Madam Speaker, regarding the proposal put forward by the ADUN Machap, who proposed that persons receiving dialysis treatment be given a small allocation for transport costs to help those suffering from dialysis illness. For the information of the Honourable ADUN Machap, the state government is very concerned about these dialysis patients. In fact, there are several agencies and departments that can channel assistance, particularly to ease the burden on patients. However, among the agencies that can channel assistance is the Baitulmal, Johor State Islamic Religious Council. For transport assistance to dialysis treatment centres, MAIJ does provide financial assistance but it is limited to patients who have no ability, for example those who have no relatives who can send them and have no income at all. Assistance is given in cash or paid directly to the dialysis centre.
Honourable Madam Speaker, next, regarding the proposal of the ADUN Maharani, who proposed that the state government intensify mental health screening campaigns, particularly among women in every district, to foster public awareness of the importance of mental well-being, in addition to combating mental health problems. For the information of the Honourable Member, from the health aspect, based on the National Health Morbidity Survey (NHMS) 2015, the prevalence of mental health problems among Malaysians aged over 16 years is 29.2%, while the prevalence in the state of Johor shows that 22.2% of its population has mental health problems.
Overall, this study found that those at risk are young women and those from low-income families. If this mental health issue is not addressed properly, it can end in mental illness. Therefore, the state of Johor gives priority to mental health as one of the issues that must be addressed well. The Johor state mental health programme, through the Mental Health Strategic Plan, strives to ensure that individuals, families and communities are healthy and aware of their potential and able to cope with life's stresses, able to work productively and able to contribute to society.
The Johor State Mental Health Strategic Plan aims to:
1. Provide mental health services that place emphasis on the promotion of mental health and the prevention of psychosocial problems.
2. Provide adequate and appropriate rehabilitation and recovery treatment services for chronic mental patients who need client care, so as to reduce morbidity, mortality and disability.
3. Create a supportive family, community and state environment that protects chronic mental patients.
This strategy has four main focuses, namely awareness promotion, early screening and treatment, psychosocial rehabilitation within the community, and intersectoral collaboration.
Among the activities of the Johor state mental health services are mental health screening for early detection of mental health symptoms; DASS (Depression, Anxiety, Stress Scale) screening, which is one of the tests for measuring the level of mental health, and is carried out at all health clinics and outreach health programmes. It is also incorporated into the KOSPEN programme, where KOSPEN volunteers are trained to carry out DASS screening in their communities and then refer cases to the nearest health clinic. Mental health services in the community, the Community Mental Health Centre (CMHC), have also been established to provide accessible treatment, rehabilitation and psychosocial intervention to patients in the community. At present, existing CMHCs are located at Puncak Damai, Klinik Kesihatan Masai and the Old Quarters of Hospital Muar. The CMHC at Klinik Kesihatan Tenglu will begin in early 2020, and the establishment of community mental health centres will be further expanded in the future. Promotional activities are carried out in collaboration with various agencies and voluntary NGOs such as Befrienders to raise awareness regarding mental health. These promotional activities are planned to be carried out throughout the year, in addition to a larger-scale awareness campaign during mental health month, which is October.
Health staff are also trained in PFA skills, namely Psychosocial First Aid, aimed at addressing psychosocial problems among those affected by disasters. Every health clinic has its own PFA team. Health staff have also been trained in various mental health activities and interventions, such as promoting the Happiness Programme and Suicide Prevention. These services are further strengthened through close cooperation with psychiatric specialists at the hospitals. In addition, collaboration with departments and NGOs is carried out to raise awareness and provide skills for addressing mental health issues among these groups. School counsellors, for example, are trained to provide counselling services to students who are screened with DASS.
The government strongly supports all efforts to ensure the health and mental well-being of the people of Johor. It is hoped that all members of society can work together to ensure that they adopt a healthy lifestyle to maintain good mental health. A prevention-oriented psychological approach should be emphasised, alongside undergoing mental health screening, so that we can take early steps to reduce conditions that may threaten our minds.
Honourable Madam Speaker, next, in answer to the follow-up question from the ADUN Mahkota, regarding the upgrading of the general ward with a capacity of 38 beds at Hospital Enche Besar Hajah Kalsom in Kluang. For the information of the Honourable ADUN Mahkota, the application for the Future Ward Building Upgrading Project at the existing HEBHK Kluang, Johor, to a general ward with a capacity of 38 beds, at a total cost of RM57 million, was applied for under Rolling Plan 4 2020 of the RMK-11. A meeting to review the project application at the KKM was held on 11 February 2019. This upgrading project was also previously applied for under Rolling Plan 2 and Rolling Plan 4 of the RMK-11. The same upgrading project application will be re-submitted under the RMK-12 project, given the need to establish additional wards to meet the increasing demand for inpatient treatment, based on the Bed Occupancy Rate, namely the BOR of this hospital, which has exceeded 100% consecutively for 2017 and 2018.
In addition, the ADUN Mahkota also proposed that the state government establish a railway museum in Kluang. For information, Keretapi Tanah Melayu Berhad (KTMB) is planning to develop the first railway museum in Malaysia. At present, planning and research are being actively carried out to enable the intended museum to be realised. This includes establishing close cooperation with the National Museum Department, updating all inventories, recording, carrying out conservation programmes and the transfer of all railway-related heritage items owned by KTMB at all locations throughout Peninsular Malaysia, including those located in Johor Bahru.
Honourable Madam Speaker, in answer to the question raised by the ADUN Senggarang regarding the government's plan for the construction of quarters at the Senggarang Health Clinic for staff. For the information of the Honourable ADUN Senggarang, for every new construction plan for a Type 3 health clinic facility together with quarters, the recommended minimum site area is 5 acres. Given that the existing site area of the Senggarang Health Clinic is only 1.7 acres, the Type 3 KK Senggarang, which was built before 2012, does not include the construction of quarters. However, the JKNJ remains concerned about the need for quarters for staff and is in the process of identifying a suitable nearby location to be proposed for the construction of quarters in the future. New construction and upgrading plans will be implemented in phases and prioritised for each district and state every year through the Malaysia Plan. The JKNJ and KKM will continue to strive to upgrade all health facilities, including health clinics, village clinics and quarters, as specified according to local needs. The government's capacity and the priorities of the Economic Planning Unit (EPU) in the future will also be taken into account.
Honourable Madam Speaker, I would like to touch briefly on what is contained in Budget 2020, namely through Focus Point 170, where the Kain Benang Training and Lestari Seni Budaya Johor will be implemented with an allocation of RM500,000.00. Under this focus point, a Weaving Talent Programme will be held, which will enable the Johor Heritage Foundation (Yayasan Warisan Johor) to seek skilled workers in the field of weaving, especially for the people of the state of Johor, in addition to developing new motifs together with the National Craft Institute. This project is a memorandum of understanding with the National Craft Institute, with the aim of disseminating information on the history, arts and heritage of the state of Johor and multiplying designs of Johor motifs in building the identity and self-esteem of Johor.
Honourable Madam Speaker, on this occasion I would also like to express my thanks to the Honourable Menteri Besar for presenting 183 Focus Points to be implemented in 2020. I hope the mandate given can be carried out well and achieve its targets. I would also like to thank all the staff of the departments under my Portfolio, as well as the government agencies, for their cooperation, support and assistance provided both at state and federal level throughout my service under the Health, Culture and Heritage Portfolio. To all Honourable Members who have touched on matters relating to my portfolio, I have tried to provide answers to the issues raised. However, should there be matters that have been overlooked, follow-up action will be taken by my heads of department. May everything that is knotted be untangled, what is murky be made clear, and what is lacking be supplemented. That is all, wabillahitaufik walhidayah wassalammualaikum warahmatullahi wabarakatuh.
The Honourable Chairman of the Committee on International Trade, Investment and Utilities is invited.
Greetings of peace and hope from Johor. Honourable Madam Speaker, Honourable Members. First of all, Honourable Madam Speaker, on the occasion of the Birthday of His Royal Majesty Tuanku Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri dan Jajahan Takluk Johor Darul Ta'zim on 22 November this year, I respectfully extend my highest congratulations and best wishes that His Royal Majesty always enjoys good health, well-being and happiness. I would also like to congratulate the Most Honourable Menteri Besar of Johor for successfully tabling the Johor State Budget for 2020. It is an inclusive and comprehensive budget, encompassing 6 Strategic Pillars and 183 focus points, which I believe are thorough and will certainly safeguard the interests of all the people of this blessed state.
Honourable Madam Speaker, I will begin by answering or winding up several questions relating to the water issue, followed by the JPS issue, then the investment issue, and finally touching on issues related to utilities, especially those concerning TNB.
Firstly, I would like to clarify the issue of the absence of water in Kampung Bukit Kenangan and Kampung Pinggir, Simpang Renggam, which was raised in this session of the House by the Honourable Machap. Honourable Member, as is well known, the hot and dry weather that struck our country from July until October last year affected the catchment areas in the state of Johor. Among the dams affected is the Machap Dam, which supplies raw water to the Simpang Renggam Water Treatment Plant. Its level dropped to a critical level, which necessitated scheduled water supply to be carried out to ensure the lifespan of the raw water could be extended.
For the Honourable Member's information, Ranhill SAJ will carry out cloud seeding at several critical dams together with the Johor state government through BAKAJ, in preparation for the hot and dry weather that is forecast to begin at the end of January 2020. With reference to Kampung Bukit Kenangan and Kampung Bukit Pinggir, geographically these villages are located in high areas. For the Honourable Member's information, on normal days, the current pressure reading in the area is between 11 and 15 metres, and to overcome the problem of low pressure, the in line pumping method is carried out so that residents receive clean water supply. However, clean water supply via water tanker lorries to areas facing water supply disruptions will also continue.
To overcome the frequent pipe bursts in the long term, the water operations of Ranhill SAJ have listed proposals for replacing old pipes every year, and the project will be implemented through PAAB according to the allocation approved by them each year. In addition, scheduled asset maintenance work is always carried out to ensure all water supply assets are fully functional. Damaged and non-functional assets are identified early for repair and replacement with new assets.
As for the question raised by the Honourable Buluh Kasap, the status of the Kuala Paya Water Treatment Plant, better known as the Buluh Kasap Water Treatment Plant, is that it has been fully completed and is undergoing testing and commissioning (T&C) work, with permission. Based on information obtained from PAAB, the Water Treatment Plant is expected to be fully operational in February 2020.
Honourable Madam Speaker, the Honourable Benut raised the issue that the government relies on only one source of water. I wish to emphasise in this august House that the Johor state government is indeed making efforts to identify alternative water sources to ensure that the state of Johor has sufficient and continuous water supply to be provided to water operators. Among the steps taken by the Johor state government is identifying several alternative water sources to be used for domestic or industrial purposes, as follows:
1. The state government will reactivate the State Water Resources Council.
2. Use of recycled water or recycle water from sewage treatment plants. The Johor government has agreed that domestic sewage treatment plants in Pasir Gudang and Bandaraya Johor Bahru will be handed over to IWK, in collaboration with Johor GLCs, for recycling and use by the industrial sector.
3. Seawater desalination process or desalination water. The Johor government has also identified two proposed seawater desalination plants, one on the eastern side of Johor to supply the Pengerang industrial area and one on the western side for the Tanjung Bin industrial area. Based on preliminary information, the desalination plants should be dedicated to supplying industrial areas, as they do not need to be processed to drinking-water standard. These plants should be driven by the private sector on condition that they are given the right to market their products only within the industrial area.
4. Proposal for Coastal Reservoirs. These Coastal Reservoirs are proposed to be developed along riverbanks and river mouths. Two Coastal Reservoirs are proposed to be developed on the left and right banks of the Johor River. Meanwhile, another Coastal Reservoir will be developed at the Pulai River. If built, it can supply sufficient water to the districts of Pontian, Johor Bahru and Pengerang.
5. Proposal for Tube Well Groundwater. This Johor government proposal uses groundwater as an alternative source to water treatment plants. It has been implemented at Lok Heng, which can produce a maximum of 1 million litres of water per day. Well construction works are also being carried out at Gembut and Tanjung Sedili. Apart from that, BPENJ, the State Economic Planning Unit, is identifying the best method to determine which groundwater areas have sufficient groundwater quality. However, it must be remembered that the Water Resources Development Grant is under the responsibility of the federal government in accordance with the Water Migration Agreement in the state of Johor in 2009.
Honourable Madam Speaker, regarding strengthening BAKAJ, the Honourable Benut need not worry, because the Johor state government gives full attention to strengthening BAKAJ. Its workforce was 14 persons in 2015. Now, in 2019, BAKAJ has 54 staff members. The number of additions in terms of Engineers, Science Officers and Testing Laboratory Officers has also been increased.
Apart from that, my friend from Bukit Pasir raised the issue of the allocation disbursed amounting to RM3.5 million for water infrastructure and management. For the information of Bukit Pasir, the RM3.5 million allocated for infrastructure and management in this budget is actually expenditure for the payment of raw water bills to Petronas from Seluyut Dam to Lebam Dam. This RM3.5 million management expenditure is managed by the State Economic Planning Unit of Johor. As of 26 October 2019, scheduled water supply in the Simpang Renggam and Benut areas has ended. These areas are receiving treated water from the Simpang Renggam Water Treatment Plant. Simpang Renggam water has for a long time faced disruptions, especially from leachate overflow from the CEP waste disposal centre. However, we should be grateful that the centre has been closed and urban drain works are being completed by JPS.
This is compounded by the fact that at that time the Machap Dam was below the critical level of 14.40 metres, while BAB was implemented to allow prolonged storage of raw water. I am thankful that today the Machap Dam is now at a level of 16.17 metres and has overflowed, supplying sufficient raw water to the Simpang Renggam Water Treatment Plant, because the maximum storage level before overflow is 16 metres.
Honourable Madam Speaker, the JPS issue. The Honourable Yong Peng, in this session, raised questions regarding the increasingly rampant encroachment on Bekok Dam. For the Honourable Yong Peng's information, the status of gazettement for purposes of control, security, prevention and legal action for Bekok Dam has gone through several stages of discussion and with the relevant parties. The action initiated earlier by the Ministry of Natural Resources and Environment is now continued by the Ministry of Water, Land and Natural Resources (KATS). The latest Coordination Meeting for this purpose was held on 30 October 2019 by the Batu Pahat District Land Office, and our side will monitor and continue to discuss with all stakeholders to resolve this problem as quickly as possible.
For information also, for the purpose of increasing the water storage capacity of Bekok Dam for water supply, the upgrading project for Bekok Dam commenced on 14 November 2019 with a completion period of 2 years, namely until 13 November 2021. This project, funded by federal government allocations under KATS, is managed by JPS Malaysia and supervised by JPS Johor State. Upon completion, the dam's current storage capacity of 32 million cubic metres will increase to 70 million cubic metres, which is more than double the existing capacity. The dam's water level will also increase significantly, but still within the existing catchment area or dam site.
The next issue concerns flooding or drainage that is not functioning well, raised by the Honourable Panti. For the Honourable Member's information, maintenance of rivers and drains and the implementation of flood mitigation projects are always carried out by JPS from time to time, whether using state or federal allocations, to reduce flood risk. The total annual allocation approved depends on many factors, including the feasibility of implementing a project, the need for land acquisition and others. If a project is not considered in the current year, it may be approved in future years. Maintenance works for Sungai Temenin and its tributaries were carried out in mid-2019, while for Kampung Lukut, involving Sungai Jemberut, it is scheduled in the work programme in early 2020. Likewise, maintenance of the river drains in Kampung Jawa and FELDA Sungai Sibol is also expected to be carried out in 2020.
Honourable Madam Speaker, regarding the investment issue. I have taken note of what was raised by the Honourable Senai. For Senai's information, I would like to state the government's commitment to tackling the issue of illegal factories, and not only illegal factories but also issues involving environmental pollution.
For the long-term plan, the state government's strategy is as follows: control in terms of determination, whereby only factories located within industrial areas will be supported by Invest Johor through the issuance of a No Objection Letter or NOL, as required by the Malaysian Investment Development Authority (MIDA), before the manufacturing licence is issued to the company.
For the information of this august House, any company that wishes to obtain a manufacturing licence must obtain an application from MIDA and a No Objection Letter from the Johor state government, and any production exceeding 2.5 million must apply.
In addition, to ensure continuous compliance by factories, the state government, through Invest Johor, in collaboration with the Local Authorities and MIDA, is requested to strengthen enforcement, including enforcement carried out in an integrated manner with the relevant government agencies. The government also urges all federal and state government agencies to play their part, among others, by holding regularisation campaigns for illegal factories, agency ground visit programmes to promote the initiatives and incentives offered by the government to industry players.
Honourable Madam Speaker, since May 2018 until June 2019, various initiatives have been taken by the state government in attracting investment to this state, in close cooperation with MIDA and other agencies, in investment promotion and trade missions. For the record, from June to December 2018, 6 months, when the Pakatan Harapan government was formed, the total investment received by the state of Johor amounted to RM29.5 billion in sectors such as the following: electrical and electronics, petrochemicals, chemicals and chemical-based products, machinery and equipment, food technology, pharmaceuticals and services.
Meanwhile, the total investment realised until December 2018 was RM8.96 billion. The total job opportunities created were 3,197 persons, with 40 projects carried out. Among the major investors who have realised their investments are the following:
1. ST Microelectronics Sdn. Bhd. in E&E in Muar, investment value RM7.5 billion, from the Netherlands.
2. Daiichi Seiko (M) Sdn. Bhd., E&E in Iskandar Puteri, from Japan, investment of RM297 million.
3. Barnes Airmortive Malaysia Sdn. Bhd. in the Iskandar area, investment value RM179 million, from the United States of America.
4. Zenith Palm Sdn. Bhd., food manufacturing in Johor Bahru, RM156 million, Malaysia-Indonesia.
5. Orgkhim Chemical Petrochemical in Tanjung Langsat, total investment of RM240 million, from Russia.
6. Aztech E&E in the Iskandar area, total investment of RM250 million, from Singapore.
For the information of this august House, for 2019, from January to June, the state of Johor succeeded in attracting investment totalling nearly RM4 billion, investment approved in the manufacturing sector alone. A total of 62 projects have been approved and are expected to create 2,501 job opportunities for the state of Johor. Among the companies that have invested in the state of Johor at that time are Pengerang Independent Terminal Sdn. Bhd., CGPC Industrial Building System Sdn. Bhd. and Mosanto (M) Malaysia Sdn. Bhd. The state government, through its agency Invest Johor, in collaboration with MIDA, will take appropriate follow-up action to assist investors and ensure the smooth running and success of these investment projects in this state.
For the information of the Honourable Panti, for 2020 there will indeed be the involvement of the Most Honourable Menteri Besar of Johor in several investment promotion and trade missions to be organised by Invest Johor and also involving my office.
Madam Speaker, I would also like to take this opportunity to extend congratulations and commendations to the Honourable Perling for being attentive to the global economy, which is constantly changing today. Indeed, for incubator-level industries and the digital economy, the government constantly promotes these industries in cooperation with GLCs and the private sector. For example, I want to emphasise here that on 15 and 16 January, eh, Johor will host the Base Conference, an international-standard conference involving the startup and digital economy, where an estimated 1,500 people will participate, to be held in Iskandar Malaysia. I welcome any Honourable Members who wish to get involved or attend; you may contact me. Actually there is a ticket, USD79, but if through me perhaps you can get it free, lah.
Apart from that, the Johor government also mentioned in the budget that we are giving grants. A grant of RM1 million for Johor state startup entrepreneurs; hopefully this can help develop the startup and incubator digital sector in Johor. I also want to emphasise here that the efforts of the Johor state to develop this startup and incubator industry are because it is in line with the 3H direction of the Johor state. And I understand that to develop this industry we need to foster a very comprehensive ecosystem. Ha, that's it. Therefore, from my visit to Silicon Valley and recently to Station F, we have obtained many connections, contacts have been established, and hopefully in the future the government, together with GLCs, will work together with companies overseas to obtain more mentorship or venture capitalists for Johor, so that Johor can emerge in their fields and investment issues in startups and incubators. And, of course, we hope that Malaysia's first Unicorn will be born in Johor, because so far Malaysia does not yet have a Unicorn. If with everyone's efforts, I really hope this first Unicorn can emerge from Johor.
Apart from that, Madam Speaker, regarding the issue of the explosion at the Pengerang Integrated Complex raised by the Honourable Tanjung Surat, it was operated by Petronas last April. The state government is indeed sensitive to the issue, especially when it involves the safety of nearby residents, namely Kampung Lepau. The state government takes this matter seriously and will promptly discuss with Petronas and also JPDC the best method to overcome this problem. Perhaps among the options is asking Petronas or any party to think of ways to relocate these residents to a more suitable and safer area.
Honourable Madam Speaker, next is the issue related to electricity and TNB. To respond to the debate from the Honourable Kemelah, I would like to state that it has been reported that as of November 2019, the percentage of electricity supply usage for the Segamat district is 26%, that is, only 96 megawatts, compared with the latest electricity distribution supply capacity of 387 megawatts. This means the electricity supply system capacity in the Segamat district can still accommodate any additional demand, whether from existing investors or new investors who wish to invest, especially in the Segamat industrial area.
The issue often raised by investors or developers is the high consumer connection charge (CSP) imposed when they submit applications to TNB through electrical consultants. Analysis shows that the costs involved are additional charges under the conditions set by the local authority (PBT) and other agencies, which require any utility works to use the HDD method, or Horizontal Direct Drilling, in line with the Electricity Supply Application Guidelines agreed by the Energy Commission (ST). These charges must be borne in full by the investor or developer.
TNB Johor has taken the initiative to establish a new supplier in the Segamat 2 Industrial Area to overcome this problem. The total cost involved in establishing the Segamat 2 main distribution substation is RM33.79 million, while the supply source to PPU Segamat 2 is channelled from PMU Bukit Siput, which is more than 9 kilometres away. TNB will install a mobile PPU that will function as an interim source first, and it is expected to begin operation by the end of June 2020. Meanwhile, the full construction of PPU Segamat 2 is expected to be completed by the end of May 2022. In other words, the construction of the mobile PPU, which will be completed by the end of June 2020, will provide a new injection to a more stable and dependable electricity supply system.
The Honourable Kahang raised the issue relating to electricity supply projects in the Orang Asli villages of Berasau and Sungai Pucur, Kluang. It is informed that the federal government, through KPLB, has appointed TNB to implement rural electricity supply projects for 2017 and 2018: grid line connection to Orang Asli villages in Peninsular Malaysia on a design and build basis. It also involves two Orang Asli villages in Kluang, Johor, namely Sungai Pucuh and Perasau. To ensure reliable electricity supply, TNB has conducted a study on the existing electricity supply system, and the study results are as follows, according to the rules under the ST Guidelines, that the minimum voltage drop value for high voltage electricity supply is 10.5KV.
Based on the results of the study, the voltage level obtained is below the level not permitted by ST. Therefore, the implementation of this project cannot be carried out. However, TNB has made several proposals to ensure that consistent electricity supply can be channelled to residents in the area. These include TNB upgrading the existing 11KV system through the construction of a new 132KV main intake substation, PMU, at Kahang in Kluang district. The construction of this PMU will take a minimum of 5 years to implement, at a cost of RM36.48 million.
Finally, the Honourable Sri Medan raised the issue of illegal factories operating with a valid or invalid electricity supply. For Sri Medan's information, TNB as the licence holder is subject to the Electricity Supply Act 1990 and the regulations thereunder, and according to the ABE of this Act, licence holders are obliged to supply electricity to anyone who applies. However, after the amendment in 2016, TNB has set conditions for applications for electricity supply to industrial and commercial premises by imposing additional conditions such as planning permission, approval from the PBT and the consent of the valid landowner. Therefore, the Authority now informs that any party wishing to apply for electricity supply from TNB must submit these documents; if they fail to do so, TNB will not supply any electricity to that area.
Honourable Madam Speaker, that is all the clarification I can provide on the issues raised throughout the debate period. Finally, once again my side extends the highest appreciation and thanks for the concern, attention, criticism and continuous support of the Honourable Members, especially towards my Committee. I give a full commitment to take note of and take action on every matter raised in this august House. Thank you.
The Honourable Member, Chairman of the Committee on Tourism, Women, Family and Community Development, is invited.
Thank you, Madam Speaker, for giving me the opportunity to take part in this winding-up session of the debate. In conjunction with the birthday celebration of Duli Yang Maha Mulia Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Takzim, I respectfully offer my humble gratitude and wish that Duli Yang Maha Mulia Tuanku will always be in good health and well-being.
I extend my congratulations to the Honourable Menteri Besar of Johor for tabling the Johor Budget 2020, themed "Memakmur dan Mensejahtera Johor Bestari", last Thursday. I would also like to take this opportunity
to thank the Honourable Members who touched on my portfolio.
Madam Speaker, the Honourable Member for Sungai Balang, Penggaram, Penawar and Tangkak raised questions about the Mama Friendly Programme. Let me offer a proverb to the Honourable Member for Sungai Balang: paku dulang paku serpih, mengata orang dia yang lebih. Before I explain the answer on the Mama Friendly Programme in detail, I would like to correct the statement of the Honourable Member for Sungai Balang regarding the allocation for this project. The Honourable Member for Sungai Balang said he was disappointed that the amount allocated to Mama Friendly is the same as in the 2019 Budget.
For everyone's information, the allocation for the Mama Friendly project for 2019 was RM50,000.00, as recorded in the 2019 Budget, Focus Point 141. For 2020, the allocation is RM300,000.00, as stated in the 2020 Budget, an increase of six-fold. The Honourable Member for Sungai Balang should read the Focus Points carefully, so as not to mislead this august House.
I am indeed proud of the Pakatan Harapan state government of Johor for its concern for women, especially breastfeeding mothers. The Johor state government was the first state to establish the Mama Friendly Programme. So far, there are 10 Local Authorities, 22 schools around Johor Bahru, Pasir Gudang and Kulai, 5 private companies and 1 Non-Governmental Organisation that have signed memoranda of understanding (MOU) with YPKDT. YPKDT will monitor the provision of these rooms.
I also take this opportunity to thank the State Education Department and the Members of Parliament who have allocated funds to schools in their respective areas to set up Mama Friendly rooms. The response at school level has been good, as there are many pregnant teachers who really need a more proper breastfeeding room at the school. Mothers have long faced the challenge of having to express breast milk in unsuitable and cramped places such as cars, under tables, store rooms or pantries. This is the state government's effort to launch an awareness campaign so that all parties, especially Heads of Departments, Company Directors or employers, will become more considerate of the needs of mothers who breastfeed their children and matters relating to breastfeeding, and of the importance of breastfeeding spaces in their respective offices. And this also supports the national breastfeeding policy.
As for i-Suri, the i-Suri Scheme is a special government incentive for housewives and women who are registered in the national poverty database, namely e-Kasih. The first phase of this scheme was launched on 8 August 2018 and took effect on 15 August 2018, and it is implemented by the Employees Provident Fund (KWSP). And, for those who registered before 30 November 2018. Those who registered after that, if they are eligible, will be listed in the Second Phase later. As for those not listed in e-Kasih, they may apply for i-Saraan if eligible, subject to the conditions imposed.
Government incentive payments will be made twice a year, that is, for every 6-month implementation. For the state of Johor, 1,164 persons have registered for i-Suri contributions for the period 15 August 2018 to 31 December 2018. Of that total, 825 persons have contributed, involving RM28,472.00, while the government incentive is RM181,111.00. The government is very concerned and takes the registration status of i-Suri seriously. Apart from providing advertisements through electronic media, pamphlets, posters and banners, the Ministry of Women, Family and Community Development (KPWKM), through the Department of Women's Development (JPW) as the main driver of i-Suri, has been actively going to village and rural areas with the cooperation of the District Office, ICU, KWSP and the National Savings Bank (BSN) to ensure information on i-Suri reaches the target group. At these ground sessions, e-Kasih participants can register and contribute on the spot. Apart from KWSP's permanent branches throughout Malaysia, there are also KWSP Mobile Teams moving from one area to another to increase the number of i-Suri registrations.
Madam Speaker, regarding the issue of OKU and PDK. The speech of the Honourable Member for Sungai Balang seems to suggest that the Pakatan Harapan government is marginalising OKU (persons with disabilities). This is very inaccurate and has a sinister motive. The Pakatan Harapan government has always been concerned about OKU. This is clearly seen in the government continuing to provide financial assistance for OKU in Johor, namely the disabled worker allowance. A total of 11,630 persons receive this benefit, involving RM51.7 million a year. Meanwhile, the OKU unemployed assistance has 8,811 persons who will receive this benefit, involving RM24.23 million a year. There are 29 welfare volunteer organisations, namely PSK OKU for the state of Johor, that receive grant allocations from the federal government with a total of RM2.73 million. And, the Johor state government continues to give an additional allowance to PDK supervisors and workers in Johor of RM200.00 a month, and special financial assistance of RM2,000.00 per person, like other Johor state civil servants. This is to appreciate their services to OKU, which are indeed very challenging.
The government also provides care and rehabilitation for OKU, including destitute OKU, at Taman Sinar Harapan, Tampoi and Taman Sinar Harapan Jubli, with a total of 267 residents, involving federal government allocation of RM7.5 million. Under the PDK Management Guidelines, the appointment of supervisors and workers is carried out through selection by a committee. The Department does not set specific qualifications for appointment of workers other than the Malaysian Certificate of Education (SPM). The Department is currently making efforts to upgrade the education and qualifications of PDK supervisors and workers throughout Malaysia, including in the state of Johor, by recognising the Malaysian Skills Certificate (SKM) Level 3 in related fields, namely PDK management and OKU care in institutions, in stages.
To date, a total of 156 PDK supervisors and workers in Johor have successfully obtained the certificate, and 60 more candidates will be recognised in 2020. Apart from that, the Basic Malaysian Sign Language Course, namely KABIM, is one of the Johor state government's initiatives through YPKDT, aimed at creating OKU-friendly services in Johor by producing government officers who are caring and responsible. It raises awareness so that participants can understand and apply sign language to meet communication needs well and effectively, and it increases the number of Johor civil servants proficient in Malaysian Sign Language when dealing with deaf OKU customers.
In 2019, KABIM was implemented involving 40 participants from government agencies, Local Authorities, the private sector and members of the public. Apart from KABIM, the state government also has training and promotion programmes, namely PLP, which are implemented with efforts to achieve the following objectives:
1. Train OKU, single mothers and low-income groups to become skilled technically in various fields.
2. Enhance the competitiveness of the local workforce and reduce the nation's dependence on foreign labour sources to meet the local job market of the national economy. Appointed vendors will assist participants in terms of training, promotion, skills enhancement and monitoring, and encourage OKU, single mothers and low-income groups to cooperate for economic benefit so that the living standards of these groups are raised.
3. Create entrepreneurs and business products under YPKDT and thereby facilitate the recruitment of manpower by industry, as well as services provided by YPKDT through the YPKDT website.
For 2019, YPKDT, through the OKU Development Unit, held 4 courses, namely gadget repair, computer repair, spa massage and housekeeping, involving 50 participants. And through these 50 course participations, YPKDT has successfully placed 5 OKU in the tourism sector and 10 OKU as recipients of equipment assistance to encourage them to generate income better.
For 2020, YPKDT will focus more on courses that prepare OKU before entering the world of work or the new jobs they will be doing. The following courses are as follows:
1. Services 2. Tourism & Hospitality 3. Information Technology
Therefore, it is hoped that this programme will continue to succeed in producing OKU who are competitive and able to carry out their assigned duties better, alongside non-OKU society, and continue to be directly involved in boosting the nation's economy.
Honourable EXCO, how many minutes do you think it will take to finish?
10 more minutes.
10 minutes? So, let us continue for another 10 minutes, and then adjourn the House.
Madam Speaker, as for single mothers and low-income women, the Darul Takzim Family Development Foundation (YPKDT) has begun running focused skills training courses in the fields they are involved in, with monitoring carried out, and has selected products and services with potential to be advertised to the general public. The aim is to make it easier for these groups to market their products and services and to make it easier for the public to obtain information online. This approach has opened up broader and more accessible business opportunities.
Madam Speaker, for 2020, YPKDT has planned various activities to enhance and empower the economy of Johor's women. Among them is the Women's Income-Generating Skills Project, or WINGS, with permission, also known as the Projek Kemahiran Menjana Pendapatan Wanita 2020. The WINGS Project is an income-generating project specifically for single mothers and low-income women, in which they will be given training, courses and workshops in various skills fields such as cooking, sewing, massage, make-up, crafts and many more. Participants will be given basic courses, followed by advanced courses, until they are able to use the skills acquired to generate income from home. In addition, participants with potential in entrepreneurship will be given basic business courses to run their own businesses.
Therefore, YPKDT will be responsible for monitoring the performance of the participants, and at the same time providing entrepreneurship courses and focused courses, namely the Focused Entrepreneur Intensive Course, as well as providing various business platforms for them to grow existing businesses to a better level. Accordingly, YPKDT will also establish a community of Johor women entrepreneurs under the Bazarsuri Johor project, which will become a platform for single mother and women entrepreneurs.
In 2020, YPKDT is targeting 400 participations by single mothers and low-income women across the state of Johor to join the various skills courses I mentioned earlier. So, with this, it is proven that the State Government does not marginalise the role of women in society and in driving the economy, but continues to empower the role of these groups so that they are not only comfortable with their current situation, but will always be competitive and able, together with the young generation, to play their respective roles in developing the family economy.
Madam Speaker, the Johor State Women's Legal Aid Scheme was implemented to help women who are less fortunate or who face civil law cases within the household. And not only that, YPKDT has also established a toll-free line, namely the YPKDT Helpline 1300-80-7000, to make it easier for women to obtain information and details about YPKDT's counselling and mediation services.
Overall, opposition members in their speeches often accuse the Johor State Government of marginalising women, and I wish to stress that the allocation provided is higher compared with previous years: the Johor Budget 2020 allocated RM3.4 million, whereas the previous year was only RM900,000.00 for women's empowerment programmes.
Madam Speaker, I would like to advise Honourable Rengit, although Rengit is not here, to always pay attention to the sittings of the House. Here he is, not in the House, because Rengit raised the matter of a bed tax, when I had already stressed that so far the Johor State Government has no plan to introduce this bed tax.
To answer the People's Representative, the State Assemblyman (ADUN) from Rengit, Kempas, Penawar, Tangkak, who touched on the Visit Johor Year 2020 (Tahun Melawat Johor 2020), the Johor State Government through Tourism Johor is indeed very committed to promoting and intensifying the Visit Johor Year 2020 campaign as a state that must be visited. With this, through the cooperation of all parties, several initiatives and action plans have been implemented, and as planned, are as follows:
1. The Pre-Launch Ceremony of the Visit Johor Year 2020 Logo & Mascot has been launched.
2. Participation in tourism exhibitions organised by MATTA in various states, and Johor has been selected as Malaysia's preferred destination at MATTA Kuala Lumpur.
3. Next, a roadshow programme will be implemented in every district in the state of Johor in 2020 through the approach of tourism exhibitions and travel marts.
4. Next, participation in tourism missions at Malaysia Fair Japan, and Travel Marts in Shenzhen and Guangzhou, China.
5. And also intensifying the publicity of activities, programmes and promotions of Visit Johor Year through the Tourism Johor Facebook page.
6. Next is organising a series of FAM Trips covering media, film producers, bloggers and social influencers, with permission, both international and national, who have high influence. For example, we have engaged a media influencer who created a video for the state of Johor, and there were 900,000 viewers of the Johor promotional video in China, as well as tourism agencies at home and abroad.
7. Strengthening strategic cooperation with AirAsia and Keretapi Tanah Melayu Berhad for advertising programmes in conjunction with Visit Johor Year.
8. Establishing cooperation with private parties or advertising firms to promote Visit Johor Year.
9. Establishing cooperation with the Johor Public Transport Corporation (PAJ) for promotional campaigns on the Bas Muafakat Johor.
10. Advertising campaigns in cooperation with ferry operators, particularly for the route from Johor Bahru to Batam, Indonesia.
11. Strengthening cooperation with Local Authorities for the screening of Tourism Johor's corporate video on LED displays throughout Johor.
12. Tourism Johor has highlighted 20 destinations and 20 tourism events for Visit Johor Year, based on the unique characteristics of each district as a tourism destination.
13. Distributing promotional materials at events or programmes organised by departments, agencies or NGOs.
14. Organising tourism events with the cooperation of various parties to intensify the Visit Johor Year campaign.
15. Promoting Visit Johor Year through tourism magazines together with industry players.
It cannot be denied that the Indonesian market is also the second most important market after Singapore. And, statistics on tourist arrivals from Indonesia, including the Riau Islands, through sea and air entry points into the state of Johor have shown an increase of 7%, namely from 814,000 people in 2018 to 872,000 people up to August 2019.
Next, Madam Speaker, the district of Tangkak is also one of the locations that has attractive tourism sites that are competitive given the district's geographical position as the first entry point via the North-South Expressway. Tourism Johor, in cooperation with the Tangkak District Council, is in the process of showcasing the image of tourism products and creating creative tourism packages.
To my friends in the opposition who say they cannot see Jo, such as Honourable Rengit even though he is not in this House, Madam Speaker, perhaps they have a very strong desire to take photos with Jo, so, with permission, I will bring Jo to this honourable House on Sunday, and I invite Members of this honourable House not to miss this opportunity, to take photos with Jo, and help us in the campaign and promotion of Visit Johor Year. Apart from that, to friends who have not seen the promotion of Visit Johor Year, I invite Members of the House to like and share the Tourism Johor Facebook page, because we have many quizzes that have been conducted on our Facebook, and who knows, Honourable Members might also win those special prizes. So, with this, I warmly welcome cooperation from all parties.
So, as a conclusion, I once again wish to record my thanks to Madam Speaker for giving me the opportunity to take part in the winding-up session today. And, thank you also to the Honourable Member
who touched on the portfolios of Tourism, Women's Development, and Family and Community of the State of Johor.
Before I end my winding-up today, allow me to present two pantun.
From Segamat to Tanjung Piai, land of the southern tip of the Asian continent, Johor is beautiful and lovely, its people are gentle in manner and noble in character.
Seven conditions of Princess Ledang, a legendary history renowned far and wide, let us, the citizens who are distinguished, make a success of Visit Johor Year.
Thank you. (Applause in the House.)
Let us all work together to make Visit Johor 2020 a success. Honourable Members, I adjourn this sitting until Sunday, 1 December 2019, at 9:30 am.
The sitting was adjourned at 5:23 pm.
Duty Officers:
Hansard Reporter: Cik Hajah Shubanah binti Yusuf, SIJ, PIS.
Assistant Hansard Reporter: Encik Hasnul Atmam bin Othman; Puan Farrah Diana binti Mohammad
Head of House Unit: Puan Hajah Asiah binti Moklis, PSI.
Publication Assistants: Puan Malina binti Mohd Nasir; Puan Noraisah binti Mohd Yusof; Encik Ariff bin Abu Bakar
Operations Assistants (Bentara): Encik Razine bin Sulaiman; Encik Hamdan bin Markom; Encik Norhayadi bin Hussien; Encik Muhamad Khirunizam bin Pahmi; Encik Mohd Norazri bin Kasim; Encik Mohd Sapri bin Manan; Encik Muhamad Khairul Asyraf bin Abdullah; Encik Muhammad Khairul bin Arop
Office Secretaries (House Reporters): Puan Azlin bin Bahrin; Puan Hajah Saniah binti Kassim; Puan Hajah Rumiah binti Sumirono; Puan Zahiti binti Muhamad Hamdi; Puan Junaidah binti Paing; Puan Siti Rojimah binti Abd. Razak; Puan Hajah Haironisha binti Zainal Abidin; Puan Noor Dalilah binti Dahalan; Puan Shuriati binti Abdul Hajar; Puan Norazilawati binti Masri; Puan Norhafizah binti Osman; Puan Raihanah binti Ismail; Pun Fakhrinnazia binti Fuad
Recording: Encik Azizan bin Md. Sidi; Encik Khairul Annuar bin Umar Usman
Video Audio Operators: Encik Noorazhan bin Mohd Salleh; Encik Ismail bin Abu Bakar