Johor · 13 September 2020
14th Assembly, 3rd session, 2nd meeting · 272 turns · 24,136 words · official PDF ↗
ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.
Announcement from the Honourable Mr Speaker.
Bismillahirahmanirrahim. Assalamualaikum warahmatullahi taala wabarakatuh and salam sejahtera. (Recitation of selawat.) Honourable Members, this morning we resume the Second Meeting of the Third Session of the Fourteenth Johor State Legislative Assembly.
Honourable Members, it is with regret that I announce the passing of Yang Berbahagia Datuk Haji Hashim bin Haji Rais, a former State Assemblyman for the Bukit Naning constituency, who served from 3 August 1986 to 4 October 1990. He returned to the mercy of God on 22 May 2020.
It is also with regret that I announce the passing of Yang Berbahagia Tuan Haji Hasmoni bin Haji Salim, a former Member of the State Executive Council who served as State Assemblyman for the Benut constituency from 22 April 1982 to 12 August 1986, and as State Assemblyman for the Pengerang constituency from 3 August 1986 to 10 October 1999. He returned to the mercy of God on 30 May 2020.
This House extends its condolences to the families of the late Yang Berbahagia Datuk Haji Hashim bin Haji Rais and Yang Berbahagia Tuan Haji Hasmoni bin Haji Salim. Let us together pray that the souls of the departed be placed among the faithful, with Muslims reciting Al-Fatihah and non-Muslims standing in reflection for one minute. Al-Fatihah (standing). OK, alhamdulillah.
Oral Questions.Questions
Honourable Penawar, please.
Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, my question is number 1.
What is the total number of recipients of the Food Bank Programme in the State of Johor under the Johor Ihsan Economic Stimulus Package, and what are the criteria for recipients of the Food Bank Programme in the state of Johor? What are the methods and modes of implementation of the Food Bank Programme in the state of Johor?
Please, Honourable EXCO member.
Salam Perpaduan, Salam Makmur Johor.
Honourable Mr Speaker, the question raised by Honourable Penawar actually contains 3 questions. One concerns the number of recipients, one concerns the criteria for recipients, and one concerns the methods and modes of implementation.
As of 8 June 2020, a total of 86,100 people have received assistance through the Food Bank Programme across the entire state of Johor. This assistance has been distributed to recipients in 3 phases: the first phase involved 40,309 recipients; the second phase 39,541 recipients; and the third phase 6,250 recipients.
As for the criteria for recipients of this Food Bank Programme, at the initial stage the programme was aimed at supplying daily food necessities to the B40 group in greatest need, particularly among recipients of e-Kasih assistance, zakat asnaf, and recipients of assistance from JKM (Department of Social Welfare).
Subsequently, assistance from this Food Bank Programme was extended to the people as follows:
1. Those whose incomes were also affected, such as small traders who could not carry on their business activities because of the PKP.
2. Those who lost their jobs because the tourism, hospitality, construction, commerce and other sectors could not operate as usual.
And those who...
3. Those whose employment was terminated by their employers.
Honourable Mr Speaker and Honourable Members, to ensure the effectiveness of the implementation of this Food Bank Programme, the Johor state government has outlined several approaches so that it is implemented in a more structured and strategic manner. Since during the PKP period the people are required to comply with the movement control order, the Government has decided that the collection centres for goods are to be managed by the District Office.
Accordingly, contributions or assistance from departments/agencies, NGOs (Non-Governmental Organisations) or volunteer companies shall be collected at the District Office. The District Office, as the coordinator together with government departments/agencies, NGOs or volunteers, is responsible for gathering information on target groups and the process of distributing the donated goods to recipients, and for ensuring that assistance reaches recipients, apart from preventing duplicate recipients.
The Government does not deny that at the early stage of the PKP and the implementation of this Food Bank Assistance, various complaints arose on this matter, as raised by Honourable Kota Iskandar. The Food Bank Programme is an early and urgent assistance channelled by the government to people affected by COVID-19 and by the PKP enforced by the government. Naturally, there were shortcomings because COVID-19 is an unprecedented situation, something that has never...happened before.
Meanwhile, while the COVID-19 outbreak was taking place, Malaysia's political turmoil also occurred, leading to a change of government because the coalition at that time failed to decide who was the most suitable candidate for Prime Minister until today. While the people were busy facing the COVID-19 outbreak, there were some who were busy fighting among themselves and attacking the government's efforts to help the people. Until today, Honourable Mr Speaker, Pemanis feels rather disappointed that there are still those who use the platform of this honourable House to make personal attacks, name calling, which is very disappointing.
Is this related to the Honourable Member's question?
It's somewhat related, eh...
Refer to the Honourable Member's question.
It's a little related...
Time... I'll give you a bit more, OK... 10 seconds more.
Yes. Honourable Mr Speaker, the government today prioritises the issues of the people, OK. We are too lazy to entertain crybabies who throw a tantrum over losing their sweets. Therefore, shortcomings in the delivery of assistance have been improved from time to time by the government. And this assistance has successfully been delivered to affected people properly. This success is certainly not only due to the role and assistance played by Honourable Members, whether on the government side or the opposition; we have together set aside political differences and delivered the assistance provided by the government to people in need properly.
And Pemanis takes this opportunity to express a million thanks to what... to the Most Honourable Menteri Besar of Johor and all Honourable Members who have helped the government overcome the existing gaps.
A special allocation of RM20,000.00 to all ADUNs, government and opposition alike, approved by the state government...
Your time is up, Honourable Member.
...and the Johor Ihsan Economic Stimulus Package has been used with full integrity and responsibility to help the people. That is all, thank you.
OK, thank you. Penawar, please.
Thank you, Honourable Member. I want details: what is the total allocation to make this Food Bank Programme a success? What about those who have just lost their source of income because of the PKP, even though they are not on the e-Kasih list, asnaf and so on? Can the government channel the programme to this group, and what are the criteria? That is all, thank you.
Please, Honourable Member.
Thank you, Honourable Penawar. The figures I have here, the overall total is RM8.545 million, and in the first phase the allocation involved RM3.97 million; the second phase RM3.95 million and the third phase RM625,000.00. That is what has been disbursed, and I think the question that Honourable Penawar raised earlier on the criteria has already been answered. And this concerns the Food Bank, OK, so if there is anything not related to the Food Bank, such as cash assistance or e-Ihsan, it is certainly not within the context of this question. Thank you.
Yes, Skudai, please.
Thank you, Honourable Mr Speaker. Before I raise my question, I would like to perhaps give a little reminder to the Honourable EXCO member that this is a question-and-answer session, not a session for flattery or praising. So...
Soalan tambahan...
...please do answer the question, OK. Honourable Mr Speaker, the Food Bank Programme is a good programme in that it can help people who need assistance. However, when the Honourable EXCO member answered earlier, I found that the criteria or conditions for providing assistance appear to overlap with other assistance from the government. At the same time, over the long term, there are sometimes people who do not fall within the groups included in this Food Bank assistance, but who, during a certain period, for example when an emergency occurs, need assistance. So, does the government have plans to study and design a structure so that we can help desperate groups who do not meet the conventional assistance criteria but who are eligible for emergency assistance for a certain period when they are in a... situation where they may lose their source of income temporarily?
Thank you, Honourable Member. Honourable EXCO member, please.
Thank you. Actually this is an unprecedented situation for us. In fact we had no data before this; we only had data from JKM and e-Kasih. But when an unprecedented incident occurred, we only then found out that some who previously were not eligible have now become eligible. Some who previously earned large salaries suddenly lost their income. So in the context of this food assistance, the government now actually has more complete data, and I think, and I hope, such an incident will not happen again, but I think if such an incident happens, we are now better prepared to face such challenges, whether in the form of an outbreak or anything else.
So, but this Food Bank may at the early stage have been said to be somewhat late, we had logistical problems at that time. PKP, logistics, all movements of the workforce were all affected. But I think that was the early stage, after which food assistance could be delivered, and I have said earlier that I also think we must thank the many ADUNs who received allocations from the government; they have helped a great deal, they have complemented what the government lacked, they have completed what the government's shortcomings were. Regardless of political affiliation.
OK, thank you, Honourable Member. The next question, Honourable Member for Senai, please.
Terima kasih.
Honourable Mr Speaker, question number 2. What is the total number of Bumiputera houses that have not been released even though they have complied with the eligibility requirements?
Please, Honourable EXCO member.
Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera, salam Makmur Johor. Honourable Mr Speaker, thank you to Honourable Senai for the question raised regarding Bumiputera housing units that have not been released even though they have complied with the conditions. Honourable Mr Speaker, allow me first to explain the conditions that must be complied with by developers before these Bumiputera lots are released. Among the conditions that developers must comply with are the following.
First, developers are required to make payment of a replacement charge for the release of Bumiputera lots at a fixed rate, with permission, fixed at 7.5% of the selling price of non-Bumiputera lots for all types of development. For industrial development, it is 10% of the sale of non-Bumiputera lots.
Second condition, the developer must ensure that at least 1 non-Bumiputera residential lot has been sold before the application for release of Bumiputera lots is made.
Third condition, the application for release of Bumiputera lots may be submitted after 12 months from the date of stamping of the supplementary agreement or, with permission, the supplemental agreement between the developer and the state government is stamped.
Meanwhile, if there is any amendment to that supplemental agreement, the 12-month period for the application for release is based on the stamping date of the latest supplementary agreement.
Fourth condition, Honourable Mr Speaker, the application for release may only be submitted after the progress of the project, which I wish to emphasise, reaches 50% on the ground and is certified by a licensed architect, or obtains a certificate of compliance and completion issued by a qualified party and certified by the developer's architect.
Fifth condition, the developer must advertise in mainstream newspapers such as Berita Harian, Utusan Malaysia, Harian Metro after 12 months from the stamping date of the supplementary agreement, or, with permission, the supplemental agreement. The original advertisements must have been displayed at least 2 times, with an interval of 60 days between the advertisements, in those mainstream newspapers.
Honourable Mr Speaker, meanwhile, the release method will be carried out in stages for residential and commercial properties: 30% for the first release, 30% for the second release and 40% for the third and subsequent releases. For industry, release is done in 2 times: 60% and 40% for the second time. For the second release, Honourable Mr Speaker, the developer must make an application after 6 months from the approval of the first release. To enable the developer to make the subsequent release, the developer must settle any arrears for the outstanding balance of payment on the earlier sale of Bumiputera lots. Under the campaign for applications for release of Bumiputera lots to non-Bumiputera lots that is currently ongoing from 1 January 2020 to 31 December 2020, it only covers residences valued at more than RM700,000.00.
Under this campaign, the release method is only 2 times, namely 60% for the first time and the remaining balance for the last release. Under the campaign currently being carried out, the replacement charge must be paid within 120 days from the date of the notification letter, different from the previous normal condition of 90 days. All the matters I have stated just now are the conditions in the policy that has been implemented and enforced for a long time in the state of Johor, and this Bumiputera land policy has been tightened in a more orderly, systematic and documented manner and enforced starting on...
Honourable Member, answer the question, answer only that question. How many is it?
Because the Honourable Member for Senai asked about the conditions, so I have to explain the conditions.
Because the time is already late.
Insya-Allah, I follow the Honourable Member's time, 1 April 2019. So on this occasion, Honourable Mr Speaker, I would like to record my thanks and my congratulations to the Honourable Member for Kota Iskandar, who seriously drove the effort to have all the conditions and land policies tightened, arranged and documented as they are today, which I want to show here, Honourable Mr Speaker, documented so that they may serve as a guide to developers, administrators and all parties involved. So, as Honourable Mr Speaker mentioned, the Most Honourable Menteri Besar said last Thursday that in the present era, Honourable Mr Speaker, we need political maturity to ensure the resilience of the state of Johor in facing any challenges of the present and future.
On that basis, Honourable Member, whatever good was done by the previous government, such as the Johor 2030 Sustainable Development Plan and the Johor People's Housing Policy, we will adopt.
Your time is already 7 minutes, Honourable Member.
Ok.
Ringkaskan, ringkaskan.
We do not discard [them] because of political differences, and this is Johor, and this is the Johor spirit. So, Honourable Member, answering the question from Senai: for the year 2019, the total number of applications for release of Bumiputera lots to non-Bumiputera lots was 275 applications, and 268 were tabled at the Housing Committee Meeting, while the total number of units that were released in accordance with the conditions was 1,799, with a value of RM115,288,128.33. For the year 2020 up to this August, 234 applications have been received and 102 applications have been tabled at the Housing and Local Government Committee Meeting, while the total number of units released with the replacement charge remaining at the 7.5 level was 89 units, with a value of RM7,583,570.93.
So, based on the explanation I have just stated, there is no unit that has met the conditions that we have not released. So all applications for Bumiputera lots that comply with the eligibility have been released as stipulated by Honourable Member's policy.
Terima kasih.
Maaf.
Thank you, Honourable Member. Senai, please.
My supplementary question, Honourable Speaker: just now the Honourable EXCO member stated that nothing has been deferred, is that right, everything was approved or did not comply with the conditions. In my office there are several documents showing that there are applications since 2017, and applications were made and conditions were complied with but were not approved. My question is, is it true or not that indeed there is none, none that were rejected or deferred?
Please, Honourable Member.
Honourable Mr Speaker, the most important thing, first, is that it meets the conditions. If they have followed the conditions and they have to pay the replacement charge as told just now within 90 days, if they make that payment we will release it, Honourable Member, and I have settled many files that have been pending since 2015. And, perhaps what Honourable Mr Speaker meant just now, in the process after the PKP from March until June, is that they are in the process of being released after they have met the conditions, Honourable Mr Speaker.
Kota Iskandar.
Thank you, Honourable Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh. If we look at the statistics from NAPIC for the first quarter of 2019, the overhang or unsold property in the state of Johor totals 36.754 billion, and of that total 34% are Bumiputera lots across various categories. If we multiply that by the replacement charge of 7.5%, it will bring revenue to our trust fund, because this is not revenue from the account held by the state government, but has its own trust account amounting to RM600 to RM800 million, and this replacement charge can be utilised to build more Rumah Mampu Biaya Johor. Furthermore, when we look at the statistics from the campaign we held for one year for Bumiputera, it only collected replacement charges totalling RM115 million, which is far below what we should have collected, RM600 to RM800 million as I mentioned earlier according to the statistics from NAPIC.
My question is whether the state government has a contingency plan or a next plan to ensure that these Bumiputera lots can be sold or released, as required by the housing developers, so that we are in a win-win situation, meaning the state government can collect the replacement charges, in the end we can build our affordable housing, and together we help the cash flow of the housing developers. Thank you.
Please go ahead, Honourable EXCO.
Thank you to the Honourable Member for Kota Iskandar. I am interested in the last question, namely what other methods we can use or the state government's contingency plan to ensure that these Bumiputera lots are not released. Earlier we debated that they should be released. So, for the information of this honourable House, the Housing and Local Government Committee is discussing with the bank, Maybank Islamic, for us to introduce a scheme which is currently being finalised, namely the scheme we call grant to own, for houses priced from RM250,00.00 to RM1.25 million. Insya-Allah, Honourable Member, with the prayers of all parties, because we are certain the problem faced by most Bumiputera is financing. This is the main issue we face, Honourable Member, financing. They get a house but the financing becomes a problem, because of their scoring, the banks are rather disappointing. So with Maybank we have agreed and it will be finalised, and we will make an MOU with Maybank Islamic in the month of 10. This scheme will be introduced in Johor where, if a house is priced at RM300,000.00, let me give an example, Honourable Dato' Speaker, buyers or those who wish to rent only need to pay RM3,000.00 and they get the keys to live in. Unlike the usual or conventional scheme, they require an upfront payment of RM30,000.00, and this will
make things difficult, and this is what causes, even though the lot is designated for Bumiputera, they do not get financing. This is being finalised together with Housing, the Legal Adviser and also the Land and Mines Office.
As for the second question from Kota Iskandar earlier, it concerns overhang property. According to my data, overhang property is classified as units that cannot be sold after 9 months, Honourable Member. After they receive the CCC, if they cannot be sold for 9 months, it is called overhang property, but if they are still in the construction process, that cannot be counted as overhang property.
Based on this National Property Information Centre (NAPIC), the definition of unsold property or property hang bank refers to property that has been completed with a certificate of completion and compliance within a period of 9 months. According to the record I have, yes. According to the record I have here, the total overhang in Johor, including condominiums, low-cost flats, low-cost housing and so on, is 5,468. In fact, I would like to mention here, Honourable Mr Speaker, that for Tangkak there is no overhang at all, in Segamat there are only 55 units overhang, and in Pontian there are 86, in Muar there are 7, in Mersing there are 28, in Ledang, none, in Kulaijaya there are 147, in Kota Tinggi there are 190 units.
Please be brief, Honourable Member.
In Kluang there are 270. Earlier there was a difference in the information, Honourable Member, I need to clarify a little. The biggest is in Johor Bahru, Honourable Member, there are 2, 4,395, and in Batu Pahat there are 290. And I agree with what was proposed by Kota Iskandar about the rate, if we can release them quickly and it becomes revenue for the Bumiputera Quota Trust Fund. Insya-Allah, if there are matters that I may be able to share with Kota Iskandar, I will discuss them with Kota Iskandar later. Thank you, Honourable Mr Speaker.
Next question, Honourable Member for Bekok, please.
Honourable Mr Speaker, question number 3.
The business world has undergone changes after COVID-19. What types of future skills training (future skills) are provided in the skills education system, such as online business teaching and training, communication, the digital economy and the gig economy?
Please, Honourable EXCO.
Assalammualaikum warahmatullahi wabarakatuh, bismillahirmannirrahim. Thank you, Honourable Speaker, and thank you to the Honourable Member for Bekok for question number 3.
The entrepreneurial or business sector is among the sectors severely affected by the attack of COVID-19, following the enforcement of the PKP directive by the state government beginning in March last year. Current trends show that most business and enterprise communities have begun to shift their inclination towards the use of digital technology in their marketing and business aspects. Looking at this potential, various development efforts have been planned and actively implemented by the state government to empower digital knowledge and skills among entrepreneurs in this state. I would like to share with this honourable House, among the initiatives that have been and will be
implemented by the state government to achieve this vision during the PKP period and post-COVID-19 are as follows:
1. The e-Bazar Makmur Johor application. The e-Bazar Makmur Johor application is an e-commerce platform that was launched and implemented during the last Ramadan. Through this programme or application, Ramadan bazaar businesses that have been registered with the PBT were given the opportunity and priority to market their products and conduct their business transactions online, considering that at that time the government had issued a directive not to allow physical operations or transactions of Ramadan bazaars on the streets.
2. The Johor e-Market Place Programme, namely Shopee. The Johor e-Market Place Programme is a programme resulting from a strategic joint venture between the Johor state government through PUJB and the number one e-commerce platform operator in Asia, namely Shopee. Through this joint venture, a special micro-site that will showcase tens of thousands of products made by Johor traders in various categories will be created on Shopee's main e-commerce site. This programme or campaign will run for 5 months starting from 9 August 2020 and ending on 31 December 2020. The launch and promotion of the programme through media, digital or social media by PUJB has already taken place and was carried out in early August last year.
Honourable Speaker, PUJB, as business and digital marketing courses, has been extended through the PUJB At Business Stop Programme, which is conducted virtually or online to provide training and exposure to entrepreneurs on the digital business world. Up to 31 August 2020, more than 40 series of programmes consisting of courses and webinars have been carried out, and it is hoped they will benefit more than 10,000 participants who have taken part throughout this series.
Honourable Speaker, as an example of the implementation of the Ikhtiar Johor Digital Master Plan, which is one of the state government of Johor's initiatives under the 7 Ikhtiar Makmur Johor that was announced by the Most Honourable Menteri Besar of Johor. To achieve this ikhtiar, the state government will establish strategic joint ventures and collaborate with the private sector to ensure that the digital capacity of entrepreneurs in Johor is on par with other developed countries. To support this ikhtiar, the state government through the Entrepreneur Development Portfolio will develop a Johor entrepreneur data centre and a holistic digital application for Johor entrepreneurs, which will function as an integrated data centre for the business and entrepreneurship sectors of this state, as well as a communication platform and latest information for local enterprises.
The implementation plan for this initiative has been identified and is expected to be launched in October 2020. This data centre or holistic application targets and will benefit approximately 100,000 entrepreneurs in the state of Johor. Recognising the importance and needs of industries that rely on high technology and in order to remain relevant with the changing currents of the world economy, the Johor state government has also been active, also actively holding discussion sessions with local higher learning institutions and also relevant accredited agencies such as IRDA, IIB Ventures, Crash and others, to establish strategic joint ventures particularly in research and in providing courses, training and skills in new technology fields including the digital field.
All these efforts are seen to be able to increase added value and marketability, human capital in the state of Johor, and can also meet the current needs of industries based on technology and digital. The government is actively developing infrastructure and
facilities, high-technology facilities such as Medini 9 Block chain and also the Kulai Iskandar Data Exchange. The government is also involved in planning to establish a location specifically to house a research and development centre and an innovation centre for robotic drone technology and also artificial intelligence. In addition, the government also takes the potential of the techno creative industry very seriously in the study process. All these initiatives will create more job opportunities, more highly skilled workers for local children, and besides can produce many more technopreneurs among the children of the state of Johor. Thank you.
Yes, please, Bekok.
Thank you, Honourable EXCO. Mr Speaker, skills mismatch, namely the incompatibility between the skills learned by graduates and those requested by employers, is one major reason graduates cannot get jobs. Studies state that 11% of graduates are unemployed for this reason. What are the steps and policies of the Human Resources Department to improve this imbalance? Thank you.
Please go ahead. I am not sure whether it is relevant to the question or not, the answer that was delivered by the EXCO earlier.
Thank you, Honourable Speaker, and thank you to my friend, the Honourable Member for Bekok. The Johor state government is very concerned about the situation that has arisen and is always striving hard to tackle any problems holistically and prudently. In line with that, the Johor state government, through the Human Capital Strategic Unit (Unit SMI), has taken drastic steps to plan and subsequently implement initiatives to tackle the problem of unemployment, especially among graduates. The main objective of the Johor state government is to consider, sorry, to enhance the skills of the people of Johor state so that they can produce more skilled and competent workers in their respective fields for the dozens of employment sectors now and in the future.
Among the initiatives currently being intensified by Unit SMI to tackle this problem are the following, namely the Johor Career Week Programme, the Graduate Technical Skills Enhancement Programme, the Up Skilling and Re-Skilling Programme.
Honourable Speaker, the Johor State Labour Department through Jobs Malaysia Johor has also taken initiatives and implemented various activities and employment service programmes to overcome the problem of unemployment in this state. Among the programmes that have been implemented is the organisation of 3 editions of Career Carnivals which were held on the following dates, namely:-
1. Jobs Malaysia Career Carnival in Pasir Gudang held on 23 February 2020. 2. Jobs Malaysia Career Carnival in Batu Pahat held on 1 March 2020. 3. Jobs Malaysia Segamat Career Carnival, 8 March 2020.
Based on the statistics of Jobs Malaysia Johor, a total of 44,957 new job opportunities were successfully created in the state of Johor from 1 January 2020 to 31 August 2020. Therefore, I am confident that the 11% of graduates who cannot get jobs, as stated by the Honourable Member for Bekok, can be reduced depending on the awareness and optimistic attitude of the graduates concerned. An attitude of keeping informed and alert to the latest information on
job opportunities as well as training schemes provided by the government will of course help them obtain suitable job opportunities. Thank you.
Yes, Parit Yaani, please.
Thank you, Speaker. Honourable EXCO, a supplementary question from Parit Yaani. Is the proposed cost sufficient, namely for what is mentioned as up skilling and re-skilling, because in my view, when we mention this matter in relation to COVID-19, those involved are people who are already employed, who have been laid off, and they need a new skill, whether in the form of IT and so on. Is it sufficient as per the question I raised, or as stated by the Most Honourable Menteri Besar, an allocation of RM600,000.00, whereas the workers who have been laid off number 173,000, so I would like to ask, what is the cost per participant to take part in the relevant course for one course, what is the cost, firstly.
Secondly, if it is RM600,000.00, how many people can attend the course. And I suggest that the state government increase the allocation by at least RM6 million, for example if it is RM1,000.00 per course, 6,000 people can be served, if it is RM2,000.00 per person, then at least 3,000 will be specifically allocated by the government to the children of Johor who have been laid off.
Please, Honourable EXCO.
Thank you for the second supplementary question. As we are well aware, the Up Skilling and Re-Skilling Programme is one of the programmes we have specially organised for those who have been laid off, so an allocation has been provided through Unit SMI, and actually the RM600,000.00 is not from our unit, because we ourselves also have a budget allocation of RM1 million to handle this matter.
For your information, Honourable Member, up skilling and re-skilling is a programme that we, we have carried out with Johor Skill Development in Pasir Gudang recently, where we receive graduates who have no place and we train them, we up-skill and we re-skill them. This is also guided by capacity and the filling of vacant positions that we want to provide. Before that we conduct a survey, we conduct a survey with industry players, and from the survey we conducted, we arrange which sectors are needed, what skills are needed, and there are 8 skills such as oil and gas, services, manufacturing and many more, various, automotive.
So, we have consolidated this, and this programme has been successfully carried out, and in October we will hold another programme and we ensure that 1,000 vacant positions will be filled, where all industry players in the market will together take and also provide a guarantee that after they are up-skilled and re-skilled, they will be taken in for work. So, insya-Allah, we are indeed moving in the same direction, we give serious consideration and to place them so that they can get work. Thank you, Honourable Speaker.
Next question, I invite the Honourable Member for Pasir Raja.
Honourable Mr Speaker, my question number 4.
How many recipients of the JKM COVID-19 assistance are there for the Pasir Raja State Assembly seat (DUN)?
Please, Honourable EXCO.
Thank you, Mr Speaker. Thank you, Honourable Pasir Raja.
The Johor State Government, through the Kota Tinggi District Social Welfare Office, has provided for 95 persons by giving food basket assistance containing basic food for daily needs during the Movement Control Order implemented due to the COVID-19 pandemic.
Meanwhile, 12 families in need of disposable diapers for children and formula milk were assisted through the Emergency Assistance Fund by the Kota Tinggi District JKM.
For the information of this honourable House, overall for the state of Johor, the Department of Social Welfare (JKM) has provided for 31,000 recipients of food basket assistance through allocations disbursed by the federal government through the National Disaster Management Agency, NADMA, and the Ministry of Finance.
Each food basket is valued at RM100 and contains basic food items such as rice, sugar, flour, sardines, biscuits, coffee, tea, milk, vermicelli, anchovies, dried chillies and spices.
Apart from that, the provision... apart from food baskets, the state government, through the Darul Ta'zim Family Development Foundation (YPKDT), has taken on the role of providing various assistance focused on increasing income during the recovery movement period.
Under YPKDT, an entrepreneurship assistance programme has been established, the Bangsa Johor Packet Food and Delivery Service, with permission, or known as Jo-Pack, which aims to stimulate the economic growth of families and the people through domestic trade directly from customer to seller. Furthermore, it indirectly creates a digital business community that is faster and easier, does not require large capital, follows current trends, and helps the people manage their livelihoods and ultimately keep pace with economic growth.
The Jo-Pack programme was opened for phase 2 today, whereby phase 1 benefited 50 entrepreneurs, and so far applications received online or manually total 693. Thank you.
Yes, Honourable Pasir Raja, please proceed. Supplementary question.
Thank you for the concise answer from the Honourable EXCO.
Mr Speaker, my supplementary question is that COVID-19 involves everyone who experiences its effects. So apart from the COVID aid distribution and the Jo-Pack assistance, what other assistance is provided by YPKDT to stimulate increased family economic income? Thank you.
Jemput EXCO.
Thank you, Honourable Pasir Raja.
Mr Speaker, apart from Jo-Pack, YPKDT is also actively engaged through its offices in every district, conducting income-generating courses for women, known as Women's Income Generating Skill, with permission. A total of 284 participants have joined 25 courses conducted, such as sewing courses, cooking courses and also pastry courses. Alhamdulillah, these courses have received encouraging response in every district and are still being implemented until the end of this year.
YPKDT also assists the target groups through the Business Equipment Assistance Scheme for every district. Entrepreneurs who run businesses on a home base, with permission, have been helped by upgrading their business equipment, for example by providing grinding machines, sewing machines, mixers, refrigerators and others they need. Overall, a total of 33 local entrepreneurs have received this business equipment assistance. And 57 persons are waiting in the approval process by YPKDT's Evaluation Committee.
For the information of this honourable House too, YPKDT has also... not forgotten the persons with disabilities who were also affected by the COVID-19 pandemic. To ensure this group is also helped to expand family income, they were also given the opportunity to join training and promotion programmes. A total of 4 courses have been conducted, namely basic bahulu making, bakery and pastry. Advanced bakery and pastry making course, product packaging and labelling course and financial management course. These four courses involved 180 persons with disabilities.
Apart from involving individuals in generating family income, YPKDT also implements community-based programmes for the people of Johor state through the Johor People's Economic Development, known as PROPER, with the involvement of all districts in the state of Johor, where participation totalled... a participation of 53 participants overall. Each district will operate and manage 500 trees, which focus on fertigation chilli cultivation because it is easy to maintain compared with other crops.
Mr Speaker, besides that, YPKDT also implements the Focused Entrepreneur Inspiration Course, known as KIUB, with the involvement of 100 participants. This course received cooperation from Majlis Amanah Rakyat, Perbadanan Usahawan Johor, and the Johor Education Foundation Education Group. The 2 main courses implemented are the business development course and the design technique course.
For various initiatives, applications for community assistance may refer to the official portal of the Office of the EXCO for Women, Family and Community Development of Johor State at the address ppwkmj.johor.gov.my. On this portal, all five departments under the supervision of my Committee are listed to make it easier for the public to find information. Thank you.
Next question. Please proceed, Honourable Semerah.
Mr Speaker, my question is question number 5.
State the total SUKMA 2020 management allocation that has been used since March 2020, as well as the additional allocation required after it was shifted to 2021.
Please, Honourable EXCO.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, I thank the Honourable Semerah for the question. He is also a former Chairman of the Johor State Tourism, Youth and Sports Committee. He asked me to state the total SUKMA management allocation that has been used since March 2020, as well as the additional allocation required after it was shifted to 2021.
Mr Speaker, as all of us are well aware, the 20th SUKMA, which was originally scheduled to be held in Johor in July 2020, and the Para SUKMA, which was scheduled for August 2020, had to be postponed due to the COVID-19 pandemic. The new date for SUKMA 2020 will be decided by the SUKMA Supreme Committee in the near future. This committee is chaired by the Honourable Minister of Youth and Sports. We expect SUKMA Johor to take place early next year.
For Mr Speaker's information, the total original allocation for organising SUKMA 2020 is RM670.9 million. Of that amount, RM150 million is for SUKMA management, while RM467.9 million is allocated for the development and improvement of SUKMA Johor's infrastructure venues.
In response to the question from the Honourable Semerah, the total SUKMA Johor management allocation that has been used since March 2020 is RM37.9 million. The additional allocation required due to SUKMA being shifted to the year 2021 is RM21.6 million, and it involves management operating expenditure. This addition is needed for additional equipment at each sports venue, accommodation and the SUKMA operations centre for compliance with the SOPs and COVID-19 prevention established by the Ministry of Health Malaysia. It will also be used for promotional activities and the SUKMA secretariat to continue promoting this SUKMA event. Let us work together and pray that SUKMA Johor will become the best SUKMA in its history of organisation. Thank you.
Yes, Semerah, please proceed with the supplementary question.
Mr Speaker, thank you to the Honourable EXCO. I take this opportunity to congratulate and commend the SUKMA 2020 secretariat led by Tuan Haji On Jabbar and his team, who have managed the SUKMA 2020 arrangements efficiently and well, even though they had to be postponed due to the COVID-19 pandemic. Here I also take this opportunity to congratulate and commend KPRJ and also JCorp, especially KPRJ for being able to complete the Johor Velodrome within a year.
Supplementary question, Honourable Member.
The question... we must also give credit here. I was informed at a press conference by the Honourable Minister that the SUKMA date had been set for 6 to 14 March 2020. Sorry... 6 to 14 March 2021. But for information at that time there is the STPM 2020 semester 3 examination (Kohod 2020) which will be conducted on 1, 2, 3, 8 and 9 March 2021. So will it be postponed from March to April as in the initial plan? And if it is shifted further from March to April, how much more allocation will be used, I think perhaps due to accommodation because previously we would use UTM and then we had to use or stay in hotels. Likewise I...
One question, Honourable Member.
This is just a continuation, there's no full stop. And if this COVID-19 pandemic continues, and this SUKMA, will it be postponed or we... start, if I'm not mistaken, perhaps there will be another SUKMA in Kuala Lumpur. So that is my only question, thank you.
He's just asking about the budget, but he went round quite a bit. Okay, please, EXCO.
Typical of politicians, Honourable Member.
The same goes for you too, Honourable Member.
The same. The question is about the date of next year's SUKMA. As I mentioned earlier, the date will be determined at the SUKMA Supreme Committee Meeting, which God willing will be held next week. So our final date will be decided at that meeting. And we will take into account what the Honourable Semerah said earlier about the SPM and so on. There is also a scenario where, for the first time, we may hold the Para SUKMA first, and then hold the SUKMA. Those are among the possibilities that may happen.
In terms of cost and so on, I would like to inform this honourable House that the state government is working closely with the federal government to ensure that, if there are any additional costs due to the shifting of the SUKMA dates, the federal level will help, God willing. Thank you, Honourable Member.
Paloh jemput.
Thank you, Mr Speaker.
Both of these are simply former EXCO members (House laughs).
Assalamualaikum warahmatullahi wabarakatuh. Honourable Member, also Honourable EXCO, I refer to the situation that is occurring today, where we see the COVID-19 pandemic as an unprecedented precedent that has never happened before, and also we're living in abnormal times, as stated by the Most Honourable Menteri Besar himself. And before I go to the question, we also take the figures that have been mentioned in this honourable House, namely that Johor is estimated to experience unemployment among its citizens of 173,000 or more in the future. And also Singapore's economic experts predict that 45,000 to 200,000 will be laid off in Singapore for those who live in Johor. So this is a very worrying situation for us.
My question is, when we face a situation that has never happened and this situation is very much in turmoil, has the state government of Johor ever discussed setting aside first the priority of organising this SUKMA, so that we give priority to the state's economy towards the welfare of the people, especially when issues of job losses arise, and various other economic issues which in my view have become more of a priority at this time, and experts studying COVID-19 in this world also say that at the very least within a year or two, we will face this abnormal situation? So has the state government once again discussed setting aside first...
Menangguhkan...
Postponing this SUKMA not only to next year's March or July, but until priority is given to the economic issues of the people in this state.
Please, Honourable EXCO.
Thank you, Honourable Paloh, for that substantial question. This matter has been discussed with the Most Honourable Menteri Besar so that we consider all possible scenarios. But as I mentioned at the beginning of my answer, the cost borne by the state government and also the federal government is nearly RM617 million, a very large figure, and we do not want it, we do not want the infrastructure that we have built, the majority of which is almost completed, in the range of 95 to 98%, to become white elephants. There are also buildings that have been completed, such as the velodrome that Honourable Semerah mentioned earlier, and so on.
We cannot afford and we do not want to see these buildings become white elephants. At the same time, in Johor itself there are 839 athletes who are being diligently trained by MSNJ, Encik Gadaffie is also here, and they are all given allowances, with some being full-time athletes. This is a source of income for them, Honourable Member. So, although that is a proposal that can and perhaps needs to be considered, when we look at the pros and cons, it is better that we continue SUKMA in the state of Johor next year, God willing. Thank you, Honourable Member.
Next question, Honourable Stulang.
Mr Speaker, my question is question number 6.
What is the status of development regarding the construction of a covered pedestrian walkway at the Johor Bahru CIQ?
Please, Honourable EXCO.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker, and thank you to Stulang. The pedestrian walkway on the Johor Causeway was proposed because many users decide to walk either to Singapore or to Johor Bahru, to avoid the congestion that occurs at the CIQ or at the Sultan Iskandar Building. The project has been proposed to the federal government and has been raised in several meetings at the federal level, as well as during the Home Minister's recent visit to the CIQ. However, the state government is still waiting for approval of allocation from the Ministry of Home Affairs or the Ministry of Works, because the walkway will be built on the Johor Causeway which is maintained by the Highway Authority. So until the allocation is obtained, we hope through this House that the state government will take the opportunity to have this project considered urgently, thank you.
Yes, Honourable Stulang, please proceed with the supplementary question.
Thank you for the answer from the Honourable EXCO. So, for information, this covered pedestrian walkway is a project that is eagerly awaited by those who frequently use the Johor Causeway. So certainly everyone hopes, and I hope that the EXCO, the MB and BPEN, and also the federal government, can continue this effort to move this project forward so that it does not fall through, and this is why I have always appealed that this project needs to be expedited, especially during this MCO. During the MCO, the number of people using the Johor Causeway is low. So if this project can be implemented now or in the near future, it can save costs, save time, and is also safer because there are fewer people using the Johor Causeway.
So my question, my supplementary question, is for this pedestrian walkway, will the government discuss with the Singapore side so that Singapore can also build a covered pedestrian walkway on the Singapore border side, because the original proposal of ours was that this covered pedestrian walkway would only reach halfway along the Johor Causeway. So can we, if possible, discuss with the Singapore side, so that Singapore can also build from the halfway point of the Johor Causeway all the way to Woodlands to complete the covered pedestrian walkway along this Johor Causeway?
Thank you, please proceed, Honourable EXCO.
Thank you, Stulang, for being so concerned, and he also accompanied me once on a visit to the Johor Causeway. Indeed, the state government sincerely hopes that this project can be implemented, and the state government has submitted a proposal whose cost amounts to RM30 million to build this facility, and the Singapore side has told me that their state government is interested in also building that walkway on the Singapore border. And certainly, if we have an opportunity to discuss, we always do discuss to improve the facilities at the Johor Causeway, including the covered pedestrian walkway. Thank you.
Next question, please proceed, Honourable Machap.
Mr Speaker, question number 7.
What efforts have been undertaken by the Johor state government to address the problem of odour and flies originating from chicken farms?
Please, Honourable EXCO.
Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, thank you for the supplementary question from the Honourable Member for Machap. For the information of this august House, for the sake of the welfare of the people and the community as a whole in the state of Johor, the state government does not compromise with any party that causes nuisance in terms of odour pollution and other matters from poultry farm operators, although in reality the poultry farming industry is a major industry in the state of Johor. The state of Johor produces 1/3 of the national output of chicken meat and eggs. The self-sufficiency rate for broiler chicken is 197.7%, while the SSL for chicken eggs is 206.12%.
In 2019, [Johor] exported to Singapore 121,108.06 metric tonnes of chicken meat and 31,346,94 metric tonnes of chicken eggs to that country. The total number of farms registered with the department in 2020 was 755 farms, and based on poultry farm licensing in 2020, 711 farms have been licensed, broken down into 152 closed farms and 559 open farms. A total of 21 farms have not yet been licensed this year because they are in the process of moving towards closed houses or are carrying out improvements. Since then, 23 farms have been ordered to close in 2020.
Honourable Mr Speaker, the department always provides advisory services, talks and training to farmers every year to give them understanding and the latest technology for managing faeces and sewage from chicken farms. The department also urges farmers to change to the closed house system and to apply for special permits and planning permission. Emphasis on the management of faeces and sewage pits has also been included in the additional conditions of licences that must be complied with by farmers. Honourable Mr Speaker, in 2012 the department set up a unit called the RAPID incentive or RAT.
To address the problem of flies at poultry farms, while for the eradication of fly nuisance in the field, the Vector Control Unit of the Department of Health also carries out spraying in public places. And this has in fact been established in every district. The implementation of the special permit for chicken farming activities on land that has no category or has an agricultural category has been enforced since September 2019, and was subsequently extended until 30 June 2020 for farmers to apply for the special chicken farming permit or PTKA. The Land and Mines Office (PTG) is also taking action to improve the PTKA special chicken farming permit application procedure. A period of 3 + 2 years is given to open-house farmers to change to closed houses.
At the same time, Honourable Mr Speaker, the department is also focusing on matters relating to faeces management and imposing additional conditions on poultry farmers.
Firstly, waste must be removed every week, below 12 days, before 12 days from the farm, to a storage place for compost sheds or the compost fertiliser process.
Secondly, avoid placing waste collection sites near water sources to prevent water pollution.
At the same time, also in the handling of laying hen waste, the waste falls onto the bedding and is dried naturally. Secondly, chicken waste is removed from the farm every day to a storage place for the composting process. As for the handling of broiler chickens, we introduce and promote the establishment of closed houses. They must be cleaned at every production cycle, which is 30 to 40 days. Secondly, they must contain moisture control and have an appropriate system to reduce odour pollution and the breeding of flies.
Thirdly, ventilation is very important and it must be provided appropriately and through open walls to use mechanical equipment.
For open houses, they must be cleaned frequently, less than 2 weeks, to break the life cycle of flies so that they do not breed. Secondly, the use of effective microorganisms or EM, dust and wood ash can be practised to help and control fly breeding at livestock farms. At the same time, Mr Speaker, the use of biogas technology, this is pollution control, especially for waste water or odour, and it is a process of anaerobic or closed decomposition of organic matter in a digester pollution tank. This is so that there is no nuisance in terms of odour caused by farmers, especially chicken farm operators, in the state of Johor Darul Ta'zim. Thank you.
Jemput Machap.
Thank you to Mr Speaker, and thank you to the EXCO for answering my question regarding the efforts that have been made to overcome the problem of fly and odour nuisance. For your information, in Simpang Renggam there are approximately 42 chicken farm operators, but in Machap alone there are 20 chicken farm operators involving broiler and laying chicken farms. Although most of these chicken farm operators state that they operate according to the SOP that has been determined, there is still nuisance in terms of odour and also flies to residents in the surrounding area. So, what more stringent action can be taken to overcome this problem so that it does not drag on? Thank you.
Please, Honourable EXCO.
Honourable Mr Speaker, thank you for the supplementary question. For the information of the House, the department has already carried out integrated inspections of chicken houses in the Machap area involving the Kluang District Office, the Kluang Land Office, BAKAJ, the Simpang Renggam District Council, PLAN Malaysia and the Department of Agriculture around Machap on 1 to 3 September 2020. This inspection was carried out so that each agency could take action under its own powers. Each agency has also agreed that these integrated inspections will be carried out periodically, every month, every 3 months.
The inspection was carried out on more than 20 farms around Machap. As a result of this inspection, 14 farms were reported to have no chicken intake, 4 farms had no chicken intake, 4 farms had no chicken intake because they were in the process of moving to closed houses, 1 farm had chickens aged 14 days, and 1 farm was found to be attempting to discharge effluent. However, immediate action to ensure the source of the effluent was closed by the operator has been taken, and at the same time they are satisfied with the existing situation.
At the same time also, Honourable Mr Speaker, I would like to inform you that law enforcement is also carried out for matters to ensure that the nuisance in terms of odour is reduced and eliminated. With reference to the Poultry Farming (Licensing and Control) Enactment 1997, Part 4 Offences, Section 16 Part 1, it is an offence for a licence holder, whether intentionally or unintentionally, to dispose of any poultry carcass, poultry faeces or poultry waste, or to discharge untreated poultry sewage into any river, tributary, drain water and also irrigation channels.
Secondly, a licence holder is deemed to have disposed of poultry carcasses, poultry faeces, poultry waste or discharged poultry sewage into a river, tributary, drain water, land or drainage channels if he fails to take any preventive action or effort to prevent the discharge or disposal. Part 17 also, Part 1 states that a licence holder must take certain measures or efforts to prevent the release or emission of unpleasant and foul odours and gases from poultry farms that cause nuisance to the public.
At the same time also, Honourable Dato' Speaker, Mr Speaker, the government also states through this Enactment that if the Director receives any complaint from any person or body that a poultry farm is releasing or emitting an unpleasant, foul odour or gas or causing nuisance to the public, the Director shall cause an investigation to be carried out regarding the complaint. Part 18, Section 18, Paragraph 1, a licence holder must maintain and keep the cleanliness of his poultry farm at all times and must take measures to prevent any condition that encourages the breeding of flies, insects and pests that may cause health hazards and nuisance.
Part 2, Second Offence, it is an offence for a licence holder, whether intentionally or unintentionally, or permitting or causing his poultry farm to be in the condition that contravenes Sub-section 1. If a farmer is found to have committed an offence, a compound of a maximum value of RM2,000.00 will be imposed, along with a show-cause notice, and the farmer must submit an improvement report within 30 days. If the improvement fails to be carried out, licence revocation action will be taken. For repeated offences, a court fine not exceeding RM10,000.00 or imprisonment not exceeding one year or both will be imposed. That is all, thank you, Honourable Mr Speaker.
Ya, Skudai.
Thank you, Honourable Mr Speaker. Honourable Mr Speaker, we always see this issue being said to be solvable by investment in, what is it, high technology. However, although we know that its approach or method of solution is still that this problem is widespread or this problem still drags on. So, among them is that when these farm operators want to make investments in this technology, they face other constraints or other problems, such as sometimes they face problems with the ownership of their farm land or the land use conditions for their farms are inadequate, what are the latest conditions, the latest land use conditions to allow these farm operators to make, what is it, investments that are sometimes worth tens of millions of ringgit. And I see that when the Honourable EXCO just now said the government's effort is to take enforcement action, but for this category they actually do not need enforcement, they need assistance and advisory services on how they can continue to feel safe and secure, with permission, or have assurance to make investments in technology.
Soalan dia?
The question is, is the government prepared to help, apart from enforcing, to address the issues that are occurring today?
Please, Honourable EXCO.
Thank you, Skudai. It is a good point raised. I am pleased to inform you that we do not, we indeed do not compromise with any party that causes nuisance, because for us we place importance on the welfare and also the affairs of society as a whole. In this regard, the government has already proposed to them, firstly, to change from open houses to closed houses.
I understand the problem faced by operators in the process of making their closed houses: they have to obtain permission and obtain KM (Planning Permission) from the relevant department, and at the same time they must also change to the amended conditions as prescribed. This matter is important to ensure that the agencies involved look at the site before permission is granted.
However, the government through the PTG and the department also looks at the question of costs involved in this process. Not only costs, but the matter of amended conditions, conditions must be followed, and it is not in, for example, water catchments and areas close to residents, these must really be followed, but at the same time we concede because, considering the process of changing open houses to closed houses, the cost is so great. So, we do not want charges, any charges, with permission, that are felt to be irrelevant and burdensome to be reduced in the future. That is all the assistance the government can provide, but at the same time we also ask operators to look at the welfare and layout of their respective houses so that they do not cause problems. If there are no problems, that is fine, no problem at all, whereas this industry contributes great revenue to the government and the nation. Thank you, Honourable Member.
It is nearly 11.00 a.m. If there are questions on the list that have not been answered orally, they will be answered in writing in the same Sitting. We adjourn the Sitting until 11.20 a.m.
The Sitting was adjourned at 11.00 a.m.
The Sitting resumed at 11.20 a.m.
Written Questions.Questions
Answers to Written Questions by Honourable Members have been tabled on the table of the House.
Continuation of debate on the Ihsan Johor economic stimulus package 2020.
Honourable Members, the debate is now resumed. Invitation to the Most Honourable Menteri Besar.
Peace be upon you, and may the mercy and blessings of Allah be upon you. Honourable Mr Speaker, first of all I would like to express my thanks and record my highest appreciation to the Honourable Members from Buluh Kasap, from Bukit Pasir, Johor Lama, from Mengkibol, Bukit Batu and also Kota Iskandar. The arguments and suggestions of the Honourable Members are taken very seriously by the state government.
Honourable Mr Speaker, with humility, I, your servant, offer my highest devotion to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang DiPertuan Bagi Negeri dan Jajahan Takluk Johor Darul Ta'zim, for the trust given to me to manage the administration of the state government. I and all the machinery of the state administration will carry out our duties and responsibilities to the best of our ability and will always uphold the Constitution of the State of Johor and accept the advice of His Royal Highness.
Honourable Mr Speaker, I said when tabling the Ihsan Johor Economic Stimulus Package that the predicament we face now has never been experienced before. Our predicament is beyond comprehension, no one knows the end of it and no one have the right prediction to solve it, with permission. Our predicament is beyond conventional understanding; we do not know when it will end. Although many academics and economists have forecast with various predictions, frankly the end of COVID-19 cannot be determined. Because of this uncertainty, I call on all parties to do the right thing, to do what is appropriate for Johor and its people, with permission. And after listening to the debates from speakers on both the government and opposition sides, I believe we are all mature enough to put the interests of the state above personal interests and the interests of party blocs.
I understand that Honourable Members all want certainty: are we truly strong and ready to face the edge of uncertainty, with permission, or the era of an uncertain future? Yes, we have strength, yes, we have readiness, and this is because, firstly, our fiscal management is very good. We have succeeded in carrying out fiscal consolidation for all Responsibility Centres and Controlling Officers through a review of the Budget 2020. This includes arranging and restructuring the operating and development allocations for 52 Controlling Officers and 147 Responsibility Centres.
We have also succeeded in increasing revenue collection and spending efficiency. And we have succeeded in introducing policies and measures suited to the current economic context. We have also succeeded in introducing policies and measures suited to our current economic context. I have taken note of Kota Iskandar's suggestion to use the state government's cash reserves. The government has taken steps to carry out a review of the Johor Budget 2020. The state government estimates that there will be a deficit in the state's financial position of RM134.36 million. This deficit will be covered through the existing state reserves. This shows that we know that state reserves must be used if necessary; that is our principle. I acknowledge that there are political propaganda claims that the state government does not dare to use the state reserves. Here, I hope Honourable Members understand that, although our state reserves are at a satisfactory level, they must be used for focused programmes and initiatives, initiatives that are targeted and fully responsible; do not use them carelessly and do not act recklessly. Even if Pakatan Harapan was prudent in its spending when it was in government before, that is not something surprising, because the context at that time was different from now, like heaven and earth. And the state government also agrees in principle that the Johor Budget 2020 is a budget that should rightly be in deficit. We will use all available resources for recovery, recovery and recovery, with permission.
Secondly, Honourable Mr Speaker, our strength in facing COVID-19 is that the state government wants to give serious focus to the issue of poverty. We need to seriously approach poverty and overcome it. And this effort has already been carried out in the Ihsan Johor Economic Stimulus Package. This effort will also be continued and further improved. Among the initiatives that have been carried out is the implementation of the Food Basket Assistance, in the form of daily necessities, which has been expanded throughout the state. This includes the target group among recipients of assistance from the Department of Social Welfare (JKM) listed in the e-Kasih system as asnaf, as persons with disabilities, Orang Asli communities and groups who have lost their jobs. We have also spent RM8.54 million, which is higher than the original allocation, because we understand that the target group is wider. This assistance has benefited 86,100 recipients. Applications were based on the existing list of aid recipients and also on applications received by the District Offices.
Among the initiatives also includes the implementation of the Ihsan Johor Cash Assistance, which has benefited 41,565 people out of all applicants. 36,345 applicants were recipients of RM250.00 assistance and 3,220 applicants were recipients of RM500.00 assistance. I acknowledge that there are many improvements we can make. The Ihsan Johor Cash Assistance is being carried out for the first time. It is also the first time it has been carried out on such a large scale. Therefore, accurate data and information on recipients has been very difficult to obtain. Apart from that, there is also a need for us to re-categorise the classification of
B40 and M40 in accordance with the current economic context. We cannot be 100% dependent on the old classification.
Honourable Mr Speaker, the crux is that Johor is committed to managing poverty, with permission. This pandemic has not only disrupted the momentum of the state's economic activities, but it has also shown the true face of poverty that has long been rooted in society. We also want to continue to protect, with permission, the most vulnerable segment of the society, or the segment of society most exposed to the current economic situation. For that reason, the implementation of the Food Basket Assistance will also continue. In the near future, Johor Entrepreneur Corporation Berhad (PUJB) will supply more than 30,000 basic food baskets valued at RM100.00 for each food basket.
The state government will coordinate with the District Offices and related agencies for the distribution to recipients, where the target group for these programmes is the poor and the hardcore poor, including those affected during the Movement Control Order (PKP). I will announce further details about this programme later.
Honourable Mr Speaker, not only that, the involvement of various GLCs, Government Link Companies, with permission, in helping to revive our economy through Corporate Social Responsibility (CSR), also needs to be highlighted. Among them are Johor Corporation (JCORP) and Iskandar Regional Authority (IRDA). JCORP has carried out initiatives such as, firstly, assistance totalling RM3 million to finance the purchase of 20 respiratory ventilator units (RVM) for patients in Intensive Care Units. The fund is managed by Yayasan Sultan Ibrahim Johor, and His Royal Highness the Sultan of Johor graciously handed over 42 RVM units to hospitals throughout the state of Johor. The assistance was contributed by JCORP together with Kulim Berhad, KPJ Healthcare Berhad, QSR Brand Holding Berhad, Johor Land Berhad, Damansara Asset Sdn. Bhd, Damansara Reit Managers Sdn. Bhd. and Waqaf Annur Corporation Berhad.
Secondly, assistance totalling RM727,849.00 in the form of goods was also provided by Kulim, JLand, KPJ Healthcare, QSR, Damansara Asset and Kara Holding (KARA). The contributions were in the form of Personal Protective Equipment (PPE) and medical equipment for hospital use such as thermometers, Melita pineapple products, KFC and Pizza Hut meal sets and Ayamas products for frontline teams. Meanwhile, the Iskandar Regional Development Authority (IRDA) has carried out various initiatives such as the IM Makmur initiative, which is an empowerment programme for target groups involving 3 aid schemes, namely training for income generation, second-generation education assistance and funds for NGOs to carry out joint projects with target groups, with an allocation of RM6 million. The allocation was channelled to the Local Authorities within the IRDA area.
Both IM Urban Farming initiatives are community-based urban agriculture projects with the concept of farm to eat and farm to sell. This project has directly helped reduce the cost of living for those in urban areas. Among the communities identified in this initiative are the Bandar Baru Uda Rukun Tetangga Area, the Presint Bakti Rukun Tetangga Area, the Sri Stulang Flat Rukun Tetangga Area and the Jentayu Kangkar Pulai Community Association.
Honourable Mr Speaker, I understand the disappointment of Kota Iskandar. I am aware that many things can be improved, especially bureaucratic red tape in the application process, data management and the distribution of the Ihsan Johor Cash Assistance as well as the Ihsan Johor Economic Stimulus Package First Series or Second Series. That is why
there are 2 steps that are being and will continue to be taken by the state government to minimise bureaucratic red tape.
Firstly, the digitalisation of the Johor Government Service Delivery System must be strengthened, reinforced and widely disseminated. To that end, the Johor Digital Master Plan, as stated in the Second Ikhtiar, 7 Ikhtiar Makmur, must be implemented immediately and it will be implemented with the involvement of all stakeholders.
Secondly, the state government under my administration practises a work system and culture based on Key Performance Indicators (KPI). The objective of the KPIs is to measure the success of initiatives or programmes in the Budget 2020. All these KPIs must be achieved by the EXCOs and related departments under their portfolios. A work system and culture like this has clearly eliminated many types of bureaucratic red tape. However, it has only just begun and there are many more improvements that can be implemented. This work system and culture is based on a 5-step approach to the agenda of performance-based leadership.
The steps are:
1. Mapping, strategic direction such as the annual budget or other announcements
including the Ihsan Johor Economic Stimulus Package Series 1 and Series 2 and the 7 Ikhtiar
Makmur Johor.
2. Setting, namely each EXCO must take ownership from the Budget Focal Points to draft their respective KPIs, which must then be presented to me.
3. Implementation.
4. Monitoring and reporting, namely EXCOs must prepare KPI reports every quarter ending in March, June, September and also December.
At the same time, the Johor System Performance Index or JIPS under the Johor State Secretary's Office, Monitoring and People's Welfare Division, is the platform provided to monitor the implementation of each Focal Point and each Initiative carried out by departments. Here it can be seen that the state government's administration can be managed with a more orderly structure, where departments obtain a clear direction and target of work through the implementation of the EXCOs' KPIs. A total of 125 out of 180 Focal Points have succeeded in achieving 50% to 85% implementation, so far in this half year.
Honourable Mr Speaker, based on the debates on last Thursday, there are areas for improvement that can be made by the state government in strengthening efforts to face the current economic situation:
1. It concerns the functions of the Local Authorities. 2. It concerns the active role of GLCs, Goverment Link company. 3. It concerns the full opening of the Johor – Singapore border.
Mengkibol argued about the role of government departments that should provide assistance and guidance to traders and entrepreneurs. I acknowledge that the role of the Local Authorities is very important at this time. In that spirit, when I made an official working visit to the Johor Bahru City Council and the Iskandar Puteri City Council recently, I called on the Local Authorities to provide opportunities, space and business support to small traders. Create business space, create incentives for single mothers and youths to trade and create jobs. The approval of business licences must also be expedited. Now is not the time to enforce for enforcement's sake. Yes, the law must be obeyed, but in the current context the Local Authorities must always look for ways to support and not to punish. For example, for small traders who apply for licences from the PBT, they must be given immediate approval if possible within 24 hours. Or they may be given temporary licences, and this initiative must also be carried out after the PKP period as an encouragement from the state government for them.
Mengkibol also raised his concerns about the financial performance of Government Link Companies and their role in efforts to revive the state's economy. For the information of Honourable Members, the state government is carrying out a transformation study of GLCs. The background to the GLC Transformation Study is:
1. To increase the added value of GLCs to the state government. 2. To ensure GLC strategies are aligned with the aspirations of the state government. 3. To establish a more effective and efficient form of GLC structure. 4. To create a consistent policy and governance framework for all
GLCs. 5. To strengthen and form a monitoring and accountability framework and; 6. To upgrade the sincerity of the results and efforts of each GLC involved.
The GLCs involved are Kumpulan Prasarana Rakyat Johor, Permodalan Darul Ta'zim, Perbadanan Islam Johor Holdings and Yayasan Pelajaran Johor Holdings, including State Secretary Incorporated (SSI) as the main investment institution of the Johor state government. The selection of the above GLCs is on rational grounds. They have the largest investment capacity for this government. Apart from that, their capacity and structure must be strengthened so that they can provide better investment capability in the future.
I also share the concerns debated by the Honourable Member regarding the issue of opening the Johor – Singapore border. Among the core matters that have caused the slowdown of Johor's economy is the closure of our border with Singapore, that is all. For that reason too, the state government has been very consistent in urging the federal government to open our border gates with Singapore. We acknowledge that policymakers need to balance between live and livelihood. It is the same in the matter of opening this border. I welcome the stance of the Honourable Minister of Health to double the number of swab tests under the Reciprocal Green Lane (RGL) scheme and also the Periodical Commute Arrangement (PCA). Moreover, to fully open the Malaysia – Singapore border is subject to certain health protocols and procedures. Speaking of balancing this live and livelihood, Honourable Bukit Batu raised the matter of restrictions, a blanket rule, on the entertainment sector. Frankly, family theme parks such as Legoland and others have been opened because they can comply with the established SOPs. The crux is, if the industry can comply with the SOPs from the National Security Council, then there is no problem for it to continue operating and there will be no issue as if the Right Honourable Prime Minister does not care about the fate of that industry.
Honourable Mr Speaker, based on the debate on last Thursday as well, there were several pressing challenges raised by the Honourable Members concerned. Firstly, is the issue of unemployment, and secondly is the issue of moratorium. The issue of unemployment is a national issue. It is a global issue, it is also an issue of economic structure and the labour market, or labour market, with permission. Moreover, in the context of the current economy. The unfavourable business climate and the rapid use of technology, big data and artificial intelligence means that jobs that existed all this time may no longer exist now. They are replaced by new jobs that require different skill sets from the past.
For the information of everyone, there are several initiatives carried out by agencies and related parties in an effort to overcome the unemployment issue. Among them, firstly, the Johor Career Week 2020 is an initiative of the Johor Human Capital Strategic Unit in collaboration with the Labour Department and also Jobs Malaysia Johor. Job seekers who are interested in attending the interview sessions must pre-register online. Only job seekers who have been shortlisted will be invited to attend the designated venues, whether in Johor Bahru, Muar or Kluang. The interviews will be conducted by appointment from 21 to 23 September 2020 simultaneously at all three locations, namely at Dewan Muafakat UTC Johor Bahru, Dewan Maharani at Muar Stadium and also at the District Labour Office in Kluang.
More than 1,000 vacancies have been offered with minimum academic qualifications from SPM up to degree level, with the participation of 30 employers from various industry or business sectors such as manufacturing, retail, food and services. Secondly, it is appropriate for this House to be informed about vacancy data on the Jobs Malaysia portal. So far, a total of 44,964 vacancies are listed on the Jobs Malaysia portal. These involve 18 industry sectors offering vacancies according to the Malaysia Standard Industrial Classification. The positions or sectors offered include agriculture, forestry and fisheries with 5,548 vacancies. The manufacturing sector has 26,137 vacancies. Meanwhile, for the electricity, gas and air conditioning supply sector there are 37 vacancies. For the water supply, sewerage, waste management and remediation activities sector there are 973 vacancies. The construction sector has 2,800 vacancies, while the wholesale and retail trade, repair of motor vehicles and motorcycles sector has 362 vacancies.
Apart from that, the vacancies listed on the Jobs Malaysia portal include transportation and storage with 2,049 vacancies. Accommodation and food and beverage service activities, 889 vacancies. Meanwhile, the financial activities, insurance and takaful sector has 636 vacancies, and other service activities have 3,969. Nevertheless, the state government and the federal government will always work together through agencies and related parties to ensure that the unemployment rate in Johor remains at the lowest possible level.
Honourable Mr Speaker, in the near future, the moratorium period on bank loan repayments and the wage subsidy that is about to end is within the knowledge of the government. However, the federal government will introduce targeted bank assistance for individuals who lose their jobs for three months and those whose income is affected for at least six months. The extension given is subject to the current salary status of the individual concerned. Bank Negara Malaysia has also reported that many borrowers who initially chose to join this moratorium have begun to resume loan repayments. All the above initiatives are to help ease the cash flow of individuals and traders who are clearly affected by the current economic situation.
Honourable Mr Speaker, I believe the current government was not involved in discussions on the amendment of the land tax because we were in the opposition at that time and we were never involved in the process of amending the land tax. Nevertheless, as a responsible government in implementing decisions made in this august House, and also in responding to the suggestion of Buluh Kasap for the government to review the land tax rate which has become too high due to the current economic situation. Therefore, I announce that the total land tax is reduced in the form of a rebate at a rate of
15% for the year 2020, 10% in the year 2021 and 5% in the year 2022. This matter is intended to appease the grievances of the people and at the same time this approach has also been approved by His Royal Highness. I am aware and understand that the granting of this rebate will reduce revenue to the state government to an extraordinary extent.
As everyone knows, revenue from land tax contributes almost 70% to the state government's income, but I believe all this is an unusual action to ensure that the grievances of all parties are heard in the current difficult economic situation. The government's concern for the hardships faced by the people has truly been understood since the beginning of this COVID-19 pandemic. Indeed, as early as March, a 50% land tax reduction for Malay reserve land for landowners who own not more than 5 hectares was also implemented and announced. The expansion from the original 4 hectares to 5 hectares to qualify for the 50% land tax reduction directly eases the burden of rural communities, especially those on FELDA settlement land.
Honourable Mr Speaker, on this occasion I would like to express my thousand thanks to the donors, to the Johor State Disaster Relief Trust Fund. As of 7 days in September 2020, the Trust Fund has recorded cash donations amounting to RM29 million. In addition, contributions were also given in the form of goods and health equipment such as Personal Protective Equipment (PPE), disinfectant liquids and also face masks. Thank you all, Johor will always remember your contributions.
Honourable Mr Speaker, it is clear that the current economic situation requires consistent encouragement, support and push. Whether from the government, the GLCs, the Local Authorities, NGOs and individuals. The efforts to revive Johor's economy must not stop merely at stimulus packages, and we cannot expect the results to bear fruit in the near future.
As I said last Thursday, the way out of the current problems is extremely difficult and winding. However, with the support of all parties, especially the Honourable Members, I believe we will be able to overcome it together. To conclude the winding-up of the Ihsan Johor Economic Stimulus Package 2020 debate, allow me to say and call on Members of the House to let us practise a way of life like kinsmen of one lineage, like lemongrass in a clump, arranged like betel leaves. We cannot be separated in interest or divided in purpose, we stand together until the end of COVID-19. Thank you.
The motion is put forward to obtain a decision. Honourable Members who agree are invited to raise their hands. Those who do not agree, the motion is agreed.
MOTION ON THE APPOINTMENT OF THE CHAIRMAN AND MEMBERS OF THE STATE PUBLIC ACCOUNTS COMMITTEE, THE STATE ASSEMBLY RIGHTS AND PRIVILEGES COMMITTEE, AND THE STATE ASSEMBLY STANDING RULES AND ORDERS COMMITTEE.
Mr Speaker, I beg to move the motion on the Appointment of the Chairman and Members of the State Public Accounts Committee, the State Assembly Rights and Privileges Committee, and the State Assembly Standing Rules and Orders Committee. This appointment is to replace the Chairman and Members of all three Committees. In accordance with Standing Order No. 110(2), the Standing Rules and Orders of the Johor State Legislative Assembly, the State Public Accounts Committee shall consist of one Chairman and not more than six Members. The proposed names are as follows:
Public Accounts Committee.
The Members are:-
Honourable Dato' Ir. Syed Sis bin Syed A Rahman as Chairman. 1. The Honourable Dato' Sharifah Azizah binti Dato' Syed Zain. 2. The Honourable Tuan Haji Abd Taib bin Abu Bakar. 3. The Honourable Tuan Hahasrin bin Hashim. 4. The Honourable Tuan Haji Rasman bin Haji Ithnain. 5. The Honourable Tuan Muhamad Said bin Jonit. 6. The Honourable Tuan Tan Hong Pin.
Also attending are the State Treasurer of Johor and the State Director of Audit of Johor. The quorum for this Committee is the Chairman and 3 Members.
Mr Speaker, next, the Chairman and Members of the State Assembly Rights and Privileges Committee and the State Assembly Standing Rules and Orders Committee, appointed in accordance with Standing Order No. 103, are as follows. The Standing Rules and Orders of the Johor State Legislative Assembly are as follows:
Committee on Rights and Freedoms of the State Assembly.
The Members are:-
The Speaker of the State Assembly as Chairman. 1. The Honourable Datuk Md. Othman bin Yusof. 2. The Honourable Kapt (B) Haji Najib bin Lep. 3. The Honourable Dato' Haji Osman bin Haji Sapian. 4. The Honourable Dato' Dr. Sahruddin bin Haji Jamal. 5. The Honourable Dato' Che Zakaria bin Mohd. Salleh. 6. The Honourable Tuan Jimmy Puah WeeTse. 7. The Honourable Tuan Haji Sheikh 'Umar Bagharib bin Ali.
Also attending are the Honourable State Legal Adviser and the Honourable State Financial Officer.
Committee on Standing Rules and Orders of the State Assembly.
The Members are:-
The Speaker of the State Assembly as Chairman. 1. The Honourable Dato' Zahari bin Sarip. 2. The Honourable Rashidah binti Ismail. 3. The Honourable Tuan Haji Rosleli bin Jahari. 4. The Honourable Puan Hajah Alwiyah binti Talib. 5. The Honourable Dr. Sulaiman bin Mohd. Nor. 6. The Honourable Tuan Gopalakrishnan a/l Subramaniam. 7. The Honourable Dr. Ramakrishnan a/l Suppiah.
Also attending is the Honourable State Legal Adviser. The quorum for these Committees is the Chairman and 3 Members.
Mr Speaker, I beg to propose the motion.
Mr Speaker, I support the motion.
Since the names of the Members have been proposed by the government and Pakatan Harapan and have been agreed upon by both sides, I think it does not need to be debated.
The motion is put forward to obtain a decision. Honourable Members who agree, please raise your hands; those who do not agree, the motion is agreed.
Debate on the election of Dewan Negara members.
Honourable Members, this election of Senators is in accordance with Section 1(2) of the Seventh Schedule (Article 45) of the Federal Constitution, following the vacancy of one seat of Senator elected by the Johor State Legislative Assembly. Accordingly, the proposal must be supported and accompanied by a written statement signed by the candidate concerned stating willingness to serve if elected. The Right Honourable Menteri Besar, please put forward the proposal now.
Mr Speaker, I beg to move the motion and propose that the Honourable Dato' Haji Jefridin bin Haji Atan be chosen by this House to become a Senator for a term of three years. Tuan Haji Jefridin bin Haji Atan, a native of Pontian aged 52, has extensive experience in politics and has played an active role in conveying various issues to government agencies. He holds a Bachelor of Arts with honours from Universiti Malaya obtained in 1991, and a Diploma in Education, also from Universiti Malaya. He began his career as a Graduate Services Officer from 1999 until 2005. Subsequently, he served as Private Secretary and Special Officer to the Right Honourable Tun Abdullah Ahmad Badawi from 2001. To date in politics, he has been very active in serving through UMNO, and he has now been elected as Chief of UMNO Tanjung Piai Division. He is also very active in the non-governmental sector, in non-governmental bodies, NGOs and volunteerism. He was previously active as Chairman of the Pontian District Youth Council, a Member of the Johor Youth Consultative Council, and the 4B District and State Youth Council of Johor.
To date, he is active as Chairman of the Tun Abdullah Ahmad Badawi Legacy Organisation (Legasi). He is also the patron of the National Silat Organisation (Pesaka) Pontian District and a volunteer member of RELA in Pontian. Based on the experience and commitment he possesses, I propose that the Honourable Dato' Haji Jefridin bin Haji Atan be chosen by this House to become a Senator. Hereby I submit the written statement that has been signed by the candidate I propose.
Mr Speaker, I support this motion.
Honourable Members, should there be any debate, I will allow only two persons to debate. The time given is five minutes. Please, if there are any.
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, Parit Yaani does not intend to reject the proposal of the Right Honourable Menteri Besar, given the current situation of the country, which still faces the threat of COVID. Therefore the country needs Senators who can add value in facing the existing situation in our country, especially representing the State of Johor, who have experience or have been involved in several issues related to the safety and health of the people of the State of Johor.
Therefore, Parit Yaani proposes a second name, although perhaps because we in PH did not receive information about the nomination early enough to obtain names earlier, but we give our view and proposal to the House, should it be considered better that this second candidate represent the State, in a situation where the State needs a Senator who is capable, has integrity and has extensive experience in the field of medicine. He is able to provide views and proposals, not only within the country but also at the international level. He has high qualifications in his field and is committed to his duties while serving as a government servant for the interest of the people and the country. Before retiring, he was directly involved in handling the Sungai Kim Kim pollution case as the State Health Director of Johor. Therefore, I request that the former State Health Director be allowed to state the name in question. That is all, for the information of Mr Speaker.
Honourable Members, the view just expressed by Parit Yaani concerns another name, the second name, which should have been included in the motion as submitted by the government. The motion was brought by the government with only one name. Therefore, only this name will be put forward as the proposal in this sitting for the post of Senator.
Ok, so the motion is put forward to obtain a decision.
Honourable Member, may I give Mr Speaker my view on this issue briefly. Ok, although just now..
Thank you, Honourable Member, I want to ask under which Standing Order this view is being made?
It is a debate, this one.
Only one debate was allowed just now..
Dua, dua.
Two, one from the government side.
I will not put forward anything. Two persons. It's alright, let us give the floor a little first. Ok.
No, Honourable Member must be fair. If that side has one, this side should have one too, but it has already gone to this motion and made an application to obtain a decision. It is already at the decision stage.
It's alright, let us give the floor. Please proceed.
No, we must follow the rules. If there already is..
But you did not stand up.
I only said two. It did not say from which side. Two, please proceed.
Assalamualaikum Mr Speaker, thank you. I would like to support the proposal of the Honourable Parit Yaani, where here we propose the name of Doktor Sallehudin bin Abdul Aziz, former State Health Director of Johor. For the information of all and for the information of Mr Speaker, he originates from Muar, is a native of Johor, and has experience in handling two major cases in the State of Johor, namely the Sungai Kim Kim pollution and also the Taman Mawar pollution issue.
For the information of all, in the Dewan Negara at present, we have 2 medical doctors.
Honourable Member, I have already said earlier, that name cannot be put forward now. That means the proposal cannot be accepted in the House; only one name. Therefore, Honourable Member can only agree or reject.
I support the proposal of Parit Yaani. Thank you.
So, the name cannot be put forward at this time. Thank you. Ok.
Honourable Members who agree, please raise your hands; those who do not agree, the motion is agreed.
Mr Speaker.
It is finished, Honourable Member.
Accordingly, I declare that the Right Honourable Dato' Haji Jefridin bin Haji Atan is chosen by this State Assembly to become a Senator for a period of 3 years. On behalf of this House, I extend my warmest congratulations to the Right Honourable Dato' Haji Jefridin bin Haji Atan. May he be able to devote his service to the people and the state as a Senator.
First Supplementary Development Estimates 2020.
Mr Speaker, I beg to move that this House immediately resolve itself into a Committee of the Whole State Assembly to consider the First Supplementary Development Estimates for 2020, which have been tabled as Meeting Paper No. 5 of 2020, and to determine whether those estimates should be approved by this House with or without amendment.
The additional Development Allocation for the year 2020 is RM18,801,000.00 and is placed under the following Committee:
Public Works, Transport and Infrastructure Committee of the State of Johor, RM18,801,000.00. Further explanation of these additions will be given at the relevant Committee stage.
Mr Speaker, I support the motion.
The motion is put forward to obtain a decision. Honourable Members who agree, please raise your hands; those who do not agree, the motion is agreed.
The House Resolves Itself into a Committee.
The matter before this Committee is that the sum of RM18,801,000.00 for Expenditure Head P.74, Public Works Department (JKR), be agreed to.
Thank you. The additional allocation application requested by the Department is RM23,940,456.79. However, the approval received from the State Treasury Office of Johor (Pejabat Perbendaharaan Negeri Johor) is RM18,801,000.00. This additional application is to cover the insufficient existing allocation needs for payments of projects under the buildings as listed with me. Thank you.
Ok. The matter is put forward.
Point of order. Mr Speaker, Skudai requests to debate this motion. Mr Speaker.
Honourable Member, Committee.
Mr Speaker, point of order. We are now at the Committee stage, and at the Committee stage we do not debate...
Only questions are allowed.
Only requests for clarification on matters are allowed. So, Honourable Member, I apologise, because at this Committee stage we are dealing with the purpose of Development P74, Public Works Department, which requires an additional allocation of RM18,801,000.00 to cover the expenditure needs where there is a shortfall in expenditure for repair and renovation works on state buildings, as explained by the Honourable State EXCO.
Not a debate. This debate is of a policy nature, but this is about specific questions on details.
Mr Speaker, according to the Standing Orders. Committees are also permitted to debate.
Yes, in the form of questions.
The debate is related to the clause that needs to be discussed. So, I have not yet entered into the debate, how can Mr Speaker know that I want to debate on policy?
Ok, proceed. But not at the policy level, yes.
I understand, I understand, I understand. Mr Speaker. Now we are discussing the Development Supplementary Estimates, which is a matter that rarely occurs in this august House, where normally Supplementary Estimates are Supply. However, usually in the Budget we make at the end of the previous year, all projects for the estimates of their expenditure go through a very precise calculation process. So, for this rather unusual practice, I request the Chairman of the Public Works Committee to provide details on how the figure of RM18 million was tabled, and what the causes were of the shortage of funds that happened, so that we had to table this supplementary estimate?
Ok, please. Honourable EXCO.
As has been stated by the Right Honourable Menteri Besar, this project is important and part of it has already been implemented. Among them, a large part of this project is for the people and public facilities: the design and completion of the garage facilities related to it at Taman Pelangi; the proposal to upgrade, repair and beautify the Mersing District Administration Office; maintenance works for the main state government buildings of JKR in Johor Bahru; maintenance works and plumbing for the main state government buildings of JKR in Johor Bahru; maintenance works for the workers' quarters in Kulai; tree felling and pruning of branches at the main state government buildings; maintaining and repairing toilets, mainholes and septic tanks, and the sewerage system at the quarters on Jalan Straits View. Those are among the projects, and do I need to read them all out? Because I can..
Ringkasan sahaja.
This is among the summary. Most of these projects are for the people, for the convenience of the public and the image of the Johor State Government, which needs to be maintained in terms of the quality of its services. Thank you.
Ok. Silakan.
Thank you, Mr Speaker. I request clarification because the allocation approved for the year 2020, which was made last year, is RM19 million. And the additional allocation applied for is RM18.8 million. That means it is almost double. I think this shows negligence or something rather strange. Usually, as my colleague mentioned earlier, the process of making this Budget, this Estimate, is done in a para manner, and buildings are not something we can say can undergo maintenance or depreciation within 2 or 3 months, but are long term, whether in physical function, functional use, or in terms of the durability of a building. What I mean is that this matter could be estimated earlier, and there should not be such a huge project or additional allocation. It shows that departments, as if our technical departments are not carrying out their duties efficiently or properly. My question is whether this should not be repeated in the coming years, because as I said earlier, these buildings have a lifespan of 60 years, 70 years, 80 years. We can make a more accurate estimated budget and there should be no situation where we apply for an additional budget that doubles what has already been approved.
Honourable Member's question.
Itu soalannya.
Mr Speaker, I would like to explain a little to this august House. The matter raised by the Honourable Member usually concerns matters touching on the formation of the Supply Enactment Bill, where we debate matters related to supply. However, this is a rule that we must follow to comply with the Development Fund Act 1966 as amended in 1989. Development Supplementary Estimates, which we usually make into a Bill, are Supply and not Development. That is why, if the Honourable Member noticed, the matter brought by the government this morning is a Development Supplementary Estimate. Our practice in this State Legislative Assembly is like that. It is not a matter that shows that the government is inefficient in estimating the proposed projects, not at all. It is only a rule, a rule stipulated by law which we have to bring to this House so as to state that RM18 million is required as the supplementary estimate for Development. It is not a new Bill that we are bringing. So, for that, Honourable Member, our rule is like that. I suggest, Mr Speaker, that if the Honourable Member's view is for us to provide more detail, we can debate this matter, and it may be referred to the House Rules Committee. We can amend it. In future we will be more lively in debating every amendment. But for now, this is the existing rule, it is not that the government is inefficient or that the approach taken is not comprehensive. No, that is the existing method adopted. It is the rule set by the Development Fund Act 1966 applied by the State Legislative Assembly. Thank you.
The matter is put forward to obtain a decision. Honourable Members who agree, please raise your hands; those who do not agree, the matter is agreed.
Mr Chairman, since the purposes of the estimates stated in Meeting Paper No. 5 of 2020 have been fully considered, I move that the resolutions of the Committee be reported to the State Assembly immediately.
The matter is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. The matter is agreed.
The State Assembly resumes.
Mr Speaker, I would like to inform the House that the Committee of this House has considered and approved, without amendment, the proposals stated in Meeting Paper No. 5 of 2020. Accordingly, I move that this House agree that the sum of RM18,801,000.00 proposed for the Additional Development Supplementary Estimate for the First Quarter of 2020 be approved by this House. And, I hereby resolve that a sum of money not exceeding RM18,801,000.00 shall be spent from the Development Fund in the Financial Year 2020 to carry out the purposes stated in the said meeting paper.
Mr Speaker, I second the motion.
The motion is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. The motion is agreed.
Supplementary Appropriation Enactment Bill for Year 2020.Bill
Mr Speaker, I move that the Bill known as the Supplementary Supply Enactment 2020 be read a first time.
Mr Speaker, I second the motion.
The Bill is read a first time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure on services for the year 2020 and to appropriate that money for specific purposes.
Mr Speaker, I would like to inform the House that I will move the motion for the second reading of this Bill today. And, I move that Standing Order 112 (2) be temporarily suspended so that the consideration of this Bill at its other stages can be completed today.
Mr Speaker, I second the motion.
The motion is put forward for approval. Those in agreement, please raise your hands; those not in agreement. Standing Order 112(2) is temporarily suspended.
Mr Speaker, I move that this Bill be read a second time now.
The additional supplementary supply for the year 2020 amounts to RM8,623,000.00 and is placed under the Committees as follows:
Committee for Natural Resources, Administration, Finance and Economic Planning and Development of Johor, RM8,623,000.00. Further explanation for the additional allocation will be given at the Committee stage.
Mr Speaker, I second the motion.
The motion before this House is that this Bill be read a second time now.
Those in agreement, please raise your hands; those not in agreement. This Bill is read a second time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure on services for the year 2020 and to appropriate that money for specific purposes.
The House sits as a Committee of the Whole.
JADUAL.
The matter before this Committee is that the sum of RM8,623,000.00 for Expenditure Head B.04, State Treasury, form part of the Schedule to this Bill.
Mr Chairman, for the Purpose of Supply B.04, State Treasury of Johor, an allocation of RM8,623,000.00 is required for the write-off of bad debts.
The matter is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. The matter is agreed.
The Schedule shall form part of this Bill.
FASAL 2.
The matter before this Committee is that Clause 2 form part of this Bill. Those in agreement, please raise your hands; those not in agreement. Clause 2 shall form part of this Bill.
FASAL 1.
The matter before this Committee is that Clause 1 form part of this Bill. Those in agreement, please raise your hands; those not in agreement. Clause 1 shall form part of this Bill.
The State Assembly resumes.
Mr Speaker, I would like to inform the House that this Bill has been considered clause by clause in Committee and agreed without amendment. I therefore move that this Bill be read a third time and passed now.
Mr Speaker, I second the motion.
The motion before this House is that the Bill known as the Supplementary Supply Enactment 2020 be read a third time and passed now.
The motion is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. This Bill is read a third time and passed.
Be it hereby enacted by the Johor State Assembly as follows:
This Enactment may be cited as the Supplementary Supply Enactment 2020.
Supplementary Appropriation (No. 2) Enactment Bill for Year 2020.Bill
Mr Speaker, I move that the Bill known as the Supplementary Supply (No. 2) Enactment 2020 be read a first time.
Mr Speaker, I second the motion.
This Bill is read a first time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure on services for the year 2020 and to appropriate that money for specific purposes.
Mr Speaker, I would like to inform the House that I will move the motion for the second reading of this Bill today. And I move that Standing Order 112 (2) be temporarily suspended so that the consideration of this Bill at its other stages can be completed today.
Mr Speaker, I second the motion.
The motion is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. Standing Order 112(2) is temporarily suspended.
Mr Speaker, I move that this Bill be read a second time now.
This additional allocation is the second supplementary expenditure for supply for 2020. The additional allocation required is RM8,997,000.00, as included in the Supplementary Supply Enactment under the following Committee:
Committee for Natural Resources, Administration, Finance, Economic Planning and Development of the State of Johor, RM8,997,000.00. Further explanation for these additions will be given at the relevant Committee stage.
Mr Speaker, I second the motion.
The motion before this House is that this Bill be read a second time now. Those in agreement, please raise your hands; those not in agreement. This Bill is read a second time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure on services for the year 2020 and to appropriate that money for specific purposes.
The House sits as a Committee.
JADUAL.
The matter before this Committee is that the sum of RM8,524,000.00 for Expenditure Head B.03, Office of the State Secretary, Management Division, form part of the Schedule to this Bill.
RM412,000.00 for Expenditure Head B.03, Office of the State Secretary, Office of the State Assembly Clerk. RM61,000.00 for Expenditure Head B.54, Batu Pahat Land Office, to form part of the Schedule to the Bill.
For the Purpose of Supply B.03, Office of the State Secretary, Management Division, an additional allocation of RM8,524,000.00 is required to cover the shortfall in departmental management expenditure. Of the said sum, RM5,640,000.00 is for supplies and other departmental materials. And, RM2,884,000.00 is for domestic grants.
For the Purpose of Supply B.03, Office of the State Secretary, Office of the Johor State Assembly Clerk, an additional allocation of RM412,000.00 is required to cover the shortfall in other financial benefits.
For the Purpose of Supply B.54, Batu Pahat Land Office, an additional allocation of RM61,000.00 is required to cover the shortfall in allocation for annual emoluments and financial assistance for the year 2020.
Mr Speaker.
Jemput.
For Purpose B.03, code 15,000, where a total sum of RM412,000.00 is allocated to the Office of the Clerk, as mentioned by the Most Honourable Member just now, and as we found in the previous meeting paper, this additional allocation is required to cover the shortfall in the allocation for the payment of overseas visit gifts and clothing allowances to 8 Honourable Members, newly appointed members of the State Executive Council (Majlis Mesyuarat Kerajaan, MMK) following the change in the leadership of the Johor state government on 28 February 2020. This is a figure that I find truly frightening. Where the clothing for 8 MMK members reaches RM412,000.00, I request a detailed explanation on this matter.
Jemput.
Mr Speaker, for this Purpose B.03, the additional allocation required is RM412,000.00. It is for the provision of special allowances and clothing allowances for 8 newly appointed Honourable Members of the Executive Council. As usual, as in the practice of previous governments too, these special allowances and clothing allowances are indeed given. But I understand that the matter raised by the Honourable Member is perhaps because of COVID. The country's borders have also been closed, so how can there be overseas visits, yet why give these special allowances?
Honourable Member, this government was formed on 20 February. The Movement Control Order (Perintah Kawalan Pergerakan, PKP) only came on 18 March. We did not know about the existence of this PKP. So, the government decided that we should give the special allowances and clothing allowances to the 8 Executive Council members as per the usual practice. That is why we approved it at that time, as we did not know about the existence of the Movement Control Order that closed the country's borders. So, that is why we approved the payment of special allowances and clothing allowances to the 8 State Assembly Members. Thank you.
The matter is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. The matter is agreed.
The Schedule shall form part of this Bill.
CLAUSE 2.
The matter before this Committee is that Clause 2 be made part of this Bill. Those in agreement, please raise your hands; those not in agreement. Clause 2 shall form part of this Bill.
FASAL 1.
The matter before this Committee is that Clause 1 form part of this Bill. Those in agreement, please raise your hands; those not in agreement. Clause 1 shall form part of this Bill.
The State Assembly resumes.
Mr Speaker, I would like to inform the House that this Bill has been considered clause by clause in Committee and agreed without amendment. I therefore move that this Bill be read a third time and passed now.
Mr Speaker, I second the motion.
The motion before this House is that the Bill known as the Supplementary Supply (No. 2) Enactment 2020 be read a third time and passed now.
The motion is put forward for a decision. Those in agreement, please raise your hands; those not in agreement. This Bill is read a third time and passed.
Be it hereby enacted by the Johor State Assembly as follows: This Enactment may be cited as the Supplementary Supply (No. 2) Enactment 2020.
This sitting is adjourned until 2:30 pm today. Thank you.
The sitting was adjourned at 12:50 pm.
The sitting resumed at 2:30 pm.
Debate on reduction of state land tax in Johor.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy of Allah. A motion from the Honourable Member for Pekan Nanas has been received by the State Assembly Clerk under Standing Order No. 32, the Standing Orders and Standing Rules of the Johor State Assembly. I would like to remind the Honourable Member that he or she is allotted only ten minutes.
Honourable Member, Mr Speaker, I thank you, Mr Speaker, for giving me the opportunity to bring forward this motion, and I extend greetings of peace to my fellow Members of this House. First of all, I humbly seek the goodwill of all colleagues, whether from Pakatan Harapan or Perikatan Nasional, to give proper consideration when the motion on the reduction of taxes is raised in this august House. Do not let this motion be rejected for political reasons simply because it was brought by the opposition.
I fully agree with the suggestion of the Menteri Besar that the state of Johor is facing a very great COVID challenge, and that as representatives of the people we must stop political games at this critical time. Jangan yang menang menjadi arang, yang kalah menjadi abu. What matters now is not only who wins and who loses, but that the people can benefit and that our country can face the COVID challenge that is striking at this time. Therefore, the issue of the increase in land tax at this time must be viewed as a matter involving public interest and must be resolved thoroughly and prudently.
Honourable Member, Mr Speaker, land tax is one of the important sources of revenue for the state government. In 2019, the total land tax collected by the state government was RM367,936,000.00, while the estimated land tax expected to be collected in 2020 was RM598 million. The difference is as high as approximately RM230 million. Pekan Nanas is aware that the action of reviewing land tax by reducing land tax and also giving rebates to landowners is a great challenge to the financial position of the Johor government. Indeed, I still hope that this motion can be approved to ease the burden of the people. I know this action will cause the Johor government to lose a high source of finance and cause a deficit in the coming year. However, Pekan Nanas wishes to stress that whether the financial position of the state government is in surplus or deficit, it is not the sole benchmark for assessing the government's performance. Moreover, in facing the COVID challenge, the government's action in channelling assistance to help the people ease their burden is more important at this time than the risk of the government facing a deficit.
Honourable Member, Mr Speaker, Pekan Nanas believes that reducing land tax can ease the burden of the people and allow them to have disposable income for daily expenses. At this critical time, it will produce a spillover effect on the economy of the state of Johor. The Johor government recorded a surplus of RM68,260,000.00 and government reserves of as much as RM3.68 billion in 2019. Pekan Nanas warmly welcomes the government using these reserves to face the COVID challenge, whether by way of tax reduction or by increasing expenditure. I greatly agree with the view of the Menteri Besar that our country's government is facing a very great challenge in this crisis. And, the government's financial deficit is not an issue that should be disputed at this critical time, and the people urgently need assistance from the government. And I am of the view that the government must spend generously on reducing taxes and using the reserves, and must be ready to provide support if the coming budget faces a deficit.
It cannot be denied that the Perikatan Nasional government has also made many efforts to resolve the problem of the increase in land tax, such as extending the payment of land tax until 30 September and a 50% reduction of land tax for Malay Reserve land, as well as what the Menteri Besar just announced, providing rebates on land tax. But at the same time, the implementation of the new land tax rates, which took effect from 1 January 2020, has also given rise to many differing views among Pakatan Harapan members. The Pakatan Harapan government once organised two briefings to give explanations and hold discussions with representatives of the people, and at that time, the Pakatan Harapan government proposed to ease the burden of the people by way of giving a rebate in 2021.
The motion raised today is actually a continuation of the House motion that was once raised by me and supported by Mahkota at the Fourth Meeting of the Second Session, which was planned to be held on 5 March 2020. Moreover, the collapse of the Pakatan Harapan government earlier this year does not mean that the efforts and views to review land tax should be stopped. Considering that the implementation of land tax will have a great impact on the economy and the people of the state of Johor. This motion was not only put forward to the Perikatan Nasional government; the same motion was also raised during the Pakatan Harapan administration. Therefore, Pekan Nanas calls on all representatives of the people, whether from Pakatan Harapan or Perikatan Nasional, to reach an understanding on this issue.
Honourable Member, Mr Speaker, although the implementation of the policy to review tax rates was initially expected not to burden the low-income group, the amendment of the land tax rates has nevertheless caused dissatisfaction among the people. We have received many complaints regarding the issue of the increase in land tax. Among the grievances received is that there are cases of land tax increases of up to nine times compared with the previous land tax. Many landowners under residential house, shop house and industrial land conditions have had to bear sharp land tax increases of more than 100%. It cannot be denied that there is a need for the Johor state government to amend land tax, considering that the last amendment to the Johor state land tax was implemented in 2004. However, the rate of the tax increase imposed must be reasonable and must not burden the people. Furthermore, the challenge and impact of the spread of the COVID pandemic could not possibly have been considered when planning the new land tax amendment. I have referred to Warta J.P.U 95, the Johor Land Rules dated 16 December 2004, and also Warta J.P.U 49, the Johor Land Rules Amendment 2020 dated 5 December 2019, to find the factors that caused land tax to soar and not as had once been anticipated. I found that one of the main causes of the soaring land tax increase is the implementation of the new land classification method.
According to the 2004 gazette, Johor land was classified into 5 types. They are village land, town land, city land category C, land category B, and land category A. Meanwhile, in the 2019 gazette, the types of Johor land have been reduced to only city land categories C, B and A. Each type will be charged a different tax rate, where category A land tax is the highest and village land tax is the lowest. Members of the public have complained that the increase in land tax for residential, house and industrial land by nearly 1 times is due to the abolition of village and town land categories. After their abolition, they were automatically upgraded to city land category C, which is charged a higher tax rate. In addition, some category C land was raised to B. The upgrading of category B land to category A also caused its tax rate to soar, because it involved not only the increase in the basic tax rate but also an increase in the tax rate caused by the change of category. That is why any complaints from these categories must be given proper consideration.
Honourable Member, Mr Speaker, according to my calculation, the change of category from village land to city land category C will cause an increase in land tax of 110% for residential land and 161.22% for shop house tax. The change of land category from village land to city land category C will cause an increase in land tax of as much as 61.54% for residential land and 82.66% for shop house land. Meanwhile, the change of category C land to category B will cause an increase in residential house tax of 77.33% and shop house tax of 83.5%..
The time is already 10 minutes, Honourable Member, please summarise.
This is a complaint that reports an increase in land tax approaching 1 times. The same situation will also occur with types of land tax other than residential land and shop houses. Apart from the complaints I have received around Pekan Nanas and Pontian, if I refer to the Briefing on the Implementation of Land Tax on 9 January 2020. An example of the land tax rate for shop houses in Buluh Kasap, Segamat increased from RM98.00 to RM256.00, showing an increase of 161.22%, and the situation of shop house tax in the Taman Suria area in Ulu Benut, Kluang also rose as much as 82.86% according to the briefing that was once held. Meanwhile, if the factor of land category change is not involved, the increase in land tax for the examples above is within the range of 40% to 50%. That is why appeals regarding land tax involving land categories, and changes of land category, must be given proper consideration, and I am of the view that a rebate of only 15% or 10% is not sufficient to resolve the complaints I have mentioned above. Furthermore, the spread of COVID across the world since the beginning of this year has brought negative impacts to our country's economy. The sluggish economic situation has caused many commercial shops and factories to become abandoned. Owners find it difficult to find tenants and buyers. Therefore, I will summarise a little, and I find that the tax rates for many categories such as workshop land, sports complex land, and cemetery land are unreasonable and will be presented in detail by the Mahkota in a future speech. And, if we look at the impact on the tourism industry, shopping complexes in areas close to Singapore have been greatly affected following many tourists being unable to spend in Johor Bahru. The unemployment of Johor residents and the commuting of workers to Singapore have also caused market demand to fall drastically and have given rise to effects that were never anticipated at the time of planning and implementing the new tax rates. Therefore, I am of the view that the implementation of the tax rate review under the Johor Land Rules, Amendment 2020 Warta JPU 49, is not suitable for the current situation.
Honourable Member, Mr Speaker, the government needs to give a deferment, the state government gives a deferment of land tax payment until 30 September, and late penalties will begin from 1 October. The date of implementation of these late penalties coincides with the end of the bank moratorium. So far, 300,000 borrowers have confirmed that they really need assistance with repayments after the moratorium, and this figure is expected to rise significantly in the future.
Honourable Member, how much longer?
Just a little. Five minutes.
Eh, this won't do, one minute, Honourable Member.
I apologise. I apologise. Causing many commercial shops and factories to become abandoned. Owners find it difficult to find tenants and buyers. Therefore, I will summarise a little. I find that the tax rates for many categories such as workshop land, sports complex land, and cemetery land are unreasonable and will be presented in detail by the Mahkota in a future speech. And, if we look at the impact on the tourism industry, shopping complexes in areas close to Singapore have been greatly affected following many tourists being unable to spend in Johor Bahru. The unemployment of Johor residents and the commuting of workers to Singapore have also caused market demand to fall drastically and have given rise to effects that were never anticipated at the time of planning and implementing the new tax rates. Therefore, I am of the view that the implementation of the tax rate review under the Johor Land Rules, Amendment 2020 Warta JPU 49, is not suitable for the current situation.
Honourable Member, Mr Speaker, the government needs to give a deferment, the state government gives a deferment of land tax payment until 30 September, and late penalties will begin from 1 October. The date of implementation of these late penalties coincides with the end of the bank moratorium. So far, 300,000 borrowers have confirmed that they really need assistance with repayments after the moratorium, and this figure is expected to rise significantly in the future.
Let me conclude, Most Honourable Member. Conclude. Your time has exceeded.
Among them there are certainly Johoreans whom we dearly love. For those who are facing difficulties, they are unable to make payments, perhaps because they have lost their jobs or their businesses have declined badly. If they are charged high taxes and late penalties as well, would the government not be making their situation worse? Therefore I hope the government can defer the payment of land tax until the end of this year. I also request that the government defer the implementation of the land tax rates under the Johor Land Rules, Amendment 2020, throughout the COVID-19 outbreak. For anyone who has not yet made land tax payments, they are permitted to make payments according to the old land tax that was approved on 16 December 2004, under Warta JPU 95. For anyone who has already made tax payments.
Honourable Member, your time has ended, Honourable Member.
Now to draw a conclusion, they may be given rebates. In short, in short, in order to ease the burden borne by the people and to provide economic stimulus during the COVID outbreak, I propose a motion to obtain an understanding in this august House to request the government to review and reduce land tax to ease the people's cost of living and stimulate the economy, by deferring the implementation of the latest land tax amendment.
The motion I have raised today is also answering a question: is it proper for us to still increase land tax during a pandemic? I hope that all Members of the Assembly will be more considerate of the people's situation at this time and reduce tax rates in the following way. I hope that this motion and proposal can receive proper consideration in this august House. The choice is in the hands of all colleagues in this House. Thank you. (The House applauds).
Honourable Member, do you have a seconder?
Bismillahirrahmanirahim. Assalamualaikum.
Honourable Member, Honourable Member, just state it, I will second first.
I second it. Honourable Member, Mr Speaker.
Since this motion has been seconded, I permit the motion to be debated by one State Assemblyman (ADUN) from the government and one State Assemblyman from the opposition. Five minutes only. Whether the government or the opposition goes first is up to you. Please, if there are any.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Honourable Mr Speaker, according to the principles of taxation in Islamic jurisprudence, the government's actions towards the people are guided by maslahah (public interest). This means that, after the government has obtained advice from ahlul halwal aqa' (those who bind and loose), the shura council, experts, and honest and trustworthy advisers, the government may impose appropriate taxes. Therefore, in line with that principle of fiqh, Mahkota calls on the Honourable Members of this House to think together and to look at the problems we face now and in the future, for the sake of deliberation for the good of the people. Accordingly, I give my support to Pekan Nanas.
As is known, the last time this tax was revised, the land tax amendment was made in 2004, 16 years ago. It was indeed appropriate and there was a rationale for a land tax increase in order to further boost the progress of the state of Johor. Moreover, at the time it was passed, there was no threat of a pandemic. The economic indicators and the fiscal position of the state and the country were on a firm footing. In fact, the state of Johor recorded a surplus of RM68,260,000.00 and state reserves of RM3.068 billion in 2019. However, in December 2019, the People's Republic of China reported the first cluster of the Novel Coronavirus in Wuhan, in the region of Hubing. Initially, COVID-19 was seen as likely to have only the same kind of impact as earlier viruses, namely SARS and also H1N1. Unexpectedly, COVID-19 has affected the Malaysian economy and the world economy as a whole. The revision of the land tax rates in the state of Johor took effect on 1 January 2020. The Johor state government under the administration of Pakatan Harapan previously organised briefings and several information sessions and discussions with taxpayers. Mahkota feels that there is a need for more in-depth discussion for the good of the people in the future.
The COVID-19 pandemic began to affect the world economy. When Malaysia was forced to implement the MCO (Movement Control Order, PKP) in order to contain the spread of the virus, people lost their livelihoods and their incomes shrank. The unemployment rate rose by 18% up to June 2020. This further strengthens the case that there is a need for this tax amendment to be discussed again. Mahkota would also like to thank the state government for postponing tax payments until 30 September 2020. However, Mahkota agrees with Pekan Nanas that this is not sufficient. This is because in September 2020, the moratorium period ends, and at the same time, the people will feel the real burden in financial terms. In the early stages of implementing the land tax amendment, Mahkota worked with the Kluang Land Office to provide explanations. It was found that many people were confused about the amendment and the increase because there were various changes. Many taxpayers found that they had to pay tax that was many times higher because their titles stated the land condition as NIL. In Kluang, someone who came to complain at Mahkota's office had his land tax for a house in 2020 increase to RM500. In 2019, he had only paid RM60. After a review was carried out, it was found that this was due to the NIL condition, and he had to go through the process of changing the condition. There were also those who continued to pay without checking with the officers; they did not change the condition because they did not receive information, and this caused a high increase. Therefore, efforts must be carried out in a planned manner to ensure that information reaches the 38,906 landowners whose titles have the explicit condition NIL, so that they can apply to change the condition.
Land tax for the industrial category has seen a significant increase. In Kluang, there are industrial estates that are rather empty because of the sluggishness of the industrial economy, even before the land tax increase. This land tax increase may cause more industrial sites to be left vacant if there is no mechanism to help owners during this COVID-19 pandemic. Compared with industrial land tax, for workshops and petrochemicals and gas, there is a question as to why the tax for workshops is higher than for petrochemicals and gas? Referring to the table on page 394, Warta JPU 49, Kaedah-kaedah Tanah Johor Pindaan 2020, petrochemicals and gas are charged RM225.00 per 100 square metres or part thereof, whereas workshops are charged RM275.00 per 100 square metres. In recent developments, the Pahang state government reduced industrial land tax by 80% with effect from 11 September 2020. So we see in Pahang that there is evidence of changes in response to the problems the country is facing now.
Honourable Mr Speaker, a landowner in the Mahkota State Assembly (DUN Mahkota) has a plot of land that is used as a car park. In 2019, he paid RM19,320.00, and now in 2020 he has been charged RM27,048.00. The additional cost of RM7,728.00 is apart from the land tax increase, and management costs have also increased. As the saying goes, having fallen, he is then struck by the ladder. The three-month MCO caused losses to his business. Land used for a sports complex has also seen an increase. During the previous MCO, sports activities were also not allowed. This affected the business of private sports complexes. Mahkota wishes to make a comparison with elitist sports. Government sports complexes are charged RM171.00 per 100 square metres or part thereof. Private sports complexes are charged RM422.00 per 100 square metres or part thereof.
Mahkota has already been speaking for more than five minutes.
However, golf courses are charged only RM5.00 per 100 square metres. That is one example. I did in fact list several other examples, but because of lack of time, I skipped giving those examples.
Honourable Mr Speaker, although the land tax increase does not affect the B40 group, Mahkota believes that every increase will cause a chain reaction, a chain reaction, leading to increases in other prices. In this regard, landowners want to offset the cost of the land tax increase by raising rental payments for land or the prices of the produce harvested. In addition, this increase becomes a justification for traders to raise the prices of the services they provide.
The next chain reaction is an increase in the cost of living, especially in towns and cities. For vacant land that is left idle, the tax increase may cause landowners to be unable to pay the tax. Mahkota also proposes that a comprehensive study be carried out on the impact of the land tax increase during the COVID-19 pandemic on the people. A comprehensive study would allow the state government to make more accurate adjustments and decisions. Therefore, the people need to receive complete information.
Apart from that, in line with the federal government's decision to extend the CMCO (Conditional Movement Control Order, PKPP) until 31 December 2020, Mahkota also wishes to propose that the postponement of tax payments be extended until 31 December 2020. For landowners who have paid for 2020, they may be given a rebate on tax in 2021. Mahkota also proposes that in future, State Assemblymen (ADUN), both from the government side and from the opposition, be invited to hold discussions together on matters relating to these taxes. Mahkota strongly agrees with the statement of the Honourable Menteri Besar that the government's priority at this time is recovery. The state government needs to be creative in finding ways to offset the absence of new investment; indeed, many investments have also been halted, withdrawn and not continued. However, a shortage of revenue sources is not constructive if the government is burdening the people with land tax increases to obtain income.
The COVID-19 pandemic crisis has caused the people to face difficulties in sustaining their lives, especially food, drink and shelter. Is the state government willing to burden the people further with land tax increases? Therefore, Mahkota once again supports the motion for negotiation on granting a land tax rebate to ease the burden on the people. That concludes my speech, with the guidance and grace of Allah. Peace be upon you, and the mercy and blessings of Allah.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and good afternoon. Thank you, Honourable Speaker. Before Panti continues the debate, Panti would like to extend its highest appreciation and congratulations to the state government under the leadership of the Honourable Datuk Ir. Hasni bin Mohammad, the 18th Menteri Besar of Johor, who has successfully managed the state of Johor well in facing the challenges of COVID-19 from its beginning until now.
Congratulations also to the federal government led by the Honourable Tan Sri Dato' Muhyiddin bin Haji Mohd Yassin for his wisdom in leading the federal government, even though he took on the responsibility of Prime Minister of Malaysia only shortly before, and lastly, not forgetting all the frontliners and all the people who together ensure compliance with the new norm today so that we continue to be victorious and eventually free, God willing, from the COVID plague one day.
Honourable Speaker, the motion brought by the Honourable Pekan Nanas today concerns land tax, and Panti reads out the last five sentences of paragraph 5 of the motion notice, in which Pekan Nanas states that, however, the rate of tax increase imposed must be reasonable and must not burden the people. Likewise, the Honourable Mengkibol, in the debate last Thursday, also stated that the land tax increase is unreasonable.
Firstly, is this motion intended to, with respect, reverse the decision that they themselves passed, when, as the Honourable Menteri Besar said this morning, we were not involved in the process of this land tax amendment.
And secondly, with such a statement, it proves that the Pakatan Harapan government at that time made a mistake in passing this matter. Perhaps it was not scrutinised or studied thoroughly, or whatever reasons were given; the point is they failed to manage well. Why was it that before, before the Pakatan Harapan government, during the time of the Barisan Nasional government, this matter did not arise, and at that time, even with the surplus budget tabled every year and the many initiatives introduced for the people, the government at that time succeeded in managing the state of Johor well until Pakatan Harapan took over in 2018. Government revenue came largely from investment brought in, both domestic and foreign, without placing an unreasonable burden as Panti said just now, which is the statement made by Pekan Nanas and Mengkibol themselves.
Honourable Speaker, today, after 22 months of Pakatan Harapan's administration, there is much damage, and there are things that the Perikatan Nasional government needs to correct. Of course, in facing the challenge of COVID-19 as well as economic uncertainty, and compounded by the lack of foreign and domestic investment that should have gone to the state of Johor, the government today relies heavily on other sources such as the taxes brought into this motion today. Of course, the government today also needs time to restore investors' confidence and to boost the economy, as we in the state of Johor once dreamed of some time ago. Johor chasing the lion will be achieved.
Honourable Speaker, let us not keep engaging in politics; let us not only talk. Only now do they want to show concern for welfare, only now do they want to show care, but when they were given the opportunity to be the government, they did not bring the things the people wanted. For us, Perikatan Nasional today, the welfare of the people has always been our first priority to achieve. When the Perikatan government was formed, as everyone knows, the country and the state were tested by the COVID-19 plague, and, thankfully, it was handled well by both the federal and state governments. And this, if we look at the history of previous administrations, before Pakatan Harapan, is something that has become a track record: with respect, natural disasters, threats from external elements, the plague today, and many other matters were successfully managed in the best way, and in the end the people benefited with stability and a harmonious and peaceful life.
Honourable Speaker, the Honourable Menteri Besar has repeatedly stated, enough with politics, the future of Johor is more important at this time. Today, there is no denying that the people are indeed affected by the threat of COVID-19, and Panti wishes to state that the state government has been and will continue to handle it well, as has been done and will continue to be done. This matter is an ongoing effort that requires the consensus of everyone and does not rest on the shoulders of the government alone. If we look at the land issue and this land tax, many things have been announced by the government, whether through the Ihsan Johor Stimulus Package, the 7 Johor Prosperity Initiatives, or other initiatives, for example, extending the payment period to a date that owners can manage, agreeing to waive payment for the transfer of ownership, agreeing to waive all late penalties, agreeing to give a one-month extension, agreeing to extend the period of the Johor land administration initiative, and also expanding the 50% tax deduction for land of 5 hectares compared with 4 hectares previously. And at this time, today, the Honourable Menteri Besar, once again with the government's concern, has shown that this is a responsible government with his announcement to give a rebate at the rate of 15%, 10%, 5% for the years 2020, 2021 and 2022.
Panti also agrees with the Honourable Buluh Kasap in the debate the other day, who stated that the government needs to be braver in spending with a larger allocation during the threat of COVID-19 today. It would not be wrong if the budget tabled later is a deficit budget, but in reality all of that is for the interest of the state and the welfare of all groups of people in the state of Johor. The greater the investment the government makes for the people, the greater the returns the people will give later in our joint efforts to hold hands and develop the state of Johor.
Honourable Speaker, in conclusion, the motion brought by Pekan Nanas today is unnecessary and should not, should not, be passed today. This is because the government's efforts to help the people did not begin today but began as soon as Perikatan Nasional became the government. Without the need for a motion to chase popularity, as Pekan Nanas has done, the state government has indeed continued to strive to give its best, and Panti believes the state government will always work to introduce various initiatives, including perhaps helping landowners directly or indirectly through better methods in the future.
Most importantly, once again, as the phrase constantly proclaimed by the Honourable Menteri Besar goes, enough with politics, because the future of Johor is more important at this time, this must be understood and carried out together by all parties. God willing, thank you.
Thank you. The motion is put forward for a decision. Those Members who agree, please raise your hands. Those who do not agree, please raise your hands. It appears that more Members do not agree. The motion is not agreed to.
Honourable Mr Speaker, I request to move a motion that this House be adjourned.
Honourable Mr Speaker, I support the motion.
Adjournment Speech.
Honourable Members, the Clerk has received two Adjournment Speeches from the Honourable Kempas and the Honourable Parit Yaani under Standing Order No. 119 of the Standing Orders and Orders of the Johor State Legislative Assembly (Dewan Negeri Johor). I would like to remind the Honourable Members that they are allotted no more than 10 minutes and must follow the text that has been submitted to the Clerk. I invite the Honourable Kempas, 10 minutes, Honourable Member, follow your text.
In the name of God, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Greetings of peace and good evening.
Thank you to the Honourable Mr Speaker for giving me the opportunity to speak at this sitting of the Johor State Legislative Assembly. Most of us know that the country is still in the phase of the Recovery Movement Control Order (PKP) until 31 December 2020. As announced by the Right Honourable Prime Minister of Malaysia, Tan Sri Haji Muhyiddin bin Haji Mohd Yassin, on 28 August 2020 past, as a result of the COVID-19 calamity. This means we will go through the PKP period for almost the whole of 2020, equivalent to more than 9 months, when this PKP period ends on 31 December 2020.
On this occasion, I would like to respectfully extend my gratitude to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar Al-Haj, Sultan Yang Dipertuan Bagi Negeri dan Jajahan Takluk Johor Darul Ta'zim, for His Royal Highness's concern and kindness, and for His Royal Highness's deep care for the people of Johor throughout this PKP period. I would also like to take this opportunity to express my thanks and congratulations to all frontliners, with permission, who consist of Ministry of Health Malaysia staff in the state of Johor such as doctors, nurses and hospital staff, the Royal Malaysia Police, the Malaysian Armed Forces, the Fire and Rescue Department, the Civil Defence Force, and all those involved as the front line in efforts to combat COVID-19, including the NGOs. Without all these frontliners, all of us would not be able to face the COVID-19 calamity successfully. It is only through their courage and steadfastness that we have succeeded, and of course their courage and steadfastness is a source of inspiration for all Malaysians.
Honourable Mr Speaker, we do not deny that all the efforts made by the Johor state government in helping the people affected by COVID-19 are a good effort. Various initiatives and assistance have been given and channelled to the people throughout this PKP period. Especially during the critical period of PKP at the early stage. Although today we are almost living a normal life, in reality there are many people affected by the COVID-19 calamity, especially in the economic sector and in the cities.
Most businesses have closed, companies have folded, workers have lost their jobs, and various other adverse effects have befallen the people, especially in the state of Johor Darul Takzim. Based on statistics from the Department of Statistics Malaysia last May, the unemployment rate in Malaysia rose to 5.3%, recording 826,100 unemployed persons. This rate is the highest since 1989. Meanwhile, according to the Right Honourable Menteri Besar of Johor, Datuk, used to have Ir., now no longer, Datuk Hasni Mohammad, the Malaysian labour force survey by the Department of Statistics Malaysia recorded the unemployment rate in Johor in the first quarter of this year reaching 3.2%. This shows an increase of 0.5% compared with the fourth quarter of 2019, and this increase in unemployment is somewhat worrying to all of us. As a consequence of this increase in unemployment, we can see the people of this state making efforts to get out of the problem of losing their source of income. Many of the people have therefore started to join the e-hailing sector such as Grab and other e-hailing platforms. Food delivery services such as Foodpanda, and not a few who run small-scale businesses.
For those who have the ability to find alternative ways of generating income to sustain themselves in the future after losing their jobs. Alhamdulillah, we believe that although it is difficult, it will to some extent help the people get through this difficult time for now.
However, what concerns us more than the problem of job loss is a group that should be given special attention, namely women, especially single mothers. Women are among those severely affected, as it was reported that 72.2% of women have lost their jobs until today. A drastic and effective step must be taken to ensure that women affected by this problem can be protected. Among the steps that the state government can take is to provide a special complaints centre under the Darul Takzim Family Development Foundation by mobilising all women's activists in every state constituency in the state of Johor to identify women who have been affected or lost their jobs, especially women who are heads of households, such as single mothers, and women who support their parents and families. At the same time, the government must also play a role in ensuring that there is no injustice in terminations of employment, especially injustice due to gender. When women are terminated, the state government must provide explanations to these women about government assistance or retaining programmes, with permission, that are provided by the government to them so that they receive sufficient information about the new fields they can enter. Until today I have not yet seen this, I am afraid that many will then commit suicide.
Apart from women, young people are also not spared from being affected by economic problems, such as job losses due to this calamity. LOE data shows that 61% of job losses are among workers aged 40 and below, with those aged 31 to 40 contributing 32%, while workers under 30 account for 29% across Malaysia. In this state of Johor, it is common knowledge that many of our young people who worked in Singapore have now lost their jobs because of the policies made by the Singapore government, which were also affected by this COVID-19 calamity. Yesterday we heard that the Singapore government and the Japanese government have already signed a reciprocal agreement to relax the entry of workers from Japan and Singapore. I hope this matter can be considered by the Johor government.
In this state of Johor, although the federal government has provided complaint platforms and several initiatives to help young people who have lost their jobs, especially those who have not previously worked in Singapore, the Johor state government must also take care and implement any initiatives to help this group. We all know that most of those who have lost their jobs, apart from joining e-hailing or becoming food delivery riders, also run small-scale businesses.
Therefore, I would like to call upon the Johor state government, especially the Local Authorities, to give leniency to those who have just started trading on the roadsides in terms of enforcement and law. Because, in the city of Johor Bahru, there are so many among them who are seeking a halal livelihood, but most of them are being prevented by the Local Authorities, whereas we are not providing leniency and facilities. I hope this matter must be taken seriously. Do not be too strict in enforcing the law to the point of putting pressure on people who are just starting to trade. It must be remembered that they trade because they have no other choice after losing their jobs as a result of the effects of this calamity.
Honourable Mr Speaker, apart from..
Honourable Kempas, Honourable Kempas, your text is only a quarter done, Honourable Member. But you only have one minute of time.
Yes, I will try to shorten it, and Honourable Mr Speaker will try to give a little more extra time.
Apart from the economic aspect, we are also worried about the adverse rate of this calamity on the social and health aspects among the people of Johor. The practice of changing lifestyles through the new norm has to some extent affected the social aspect among the people of Johor. The Johor state government must also ensure that the health level of the people of Johor remains at a controlled level, especially in terms of emotion and thinking. Being affected by economic problems with the reduction in social activities will certainly cause poor emotional pressure for some individuals.
Therefore, among the steps that the government can take is to provide counselling services and advisory services to ensure the emotional stress of these groups is kept at a low level. These groups need to be given attention so that the state government's efforts to build a healthy generation of citizens can be implemented effectively.
Honourable Dato' Speaker, the government also sees the increase in crime resulting from this calamity. The economic downturn that we are facing as a result of this calamity not only increases unemployment but also leads to a rise in crime. This affects society from a social perspective. In this regard, I would like to call upon the Johor government to effectively curb the rise in crime that has increased as a result of this calamity, because we are worried that it will threaten the wellbeing and peace of the people of the state of Johor.
In our perseverance in facing the hardship of this calamity, Johor has also sadly been struck by another problem, in the political aspect. However, we know that before the implementation of the PKP, the state of Johor had just changed government from Pakatan Harapan to Perikatan Nasional. The same goes for the federal government. This has already happened and no one can deny it. However, in the midst of the people's hardship in facing the crisis caused by COVID-19, all political parties, especially political party leaders, whether the opposition or the government that does not hold positions in the government, should stop all political provocations. Because this also creates an uncertain situation. Political jabs and manoeuvres that will result in division and political instability, especially towards the members of this new state government party, must not be sensationalised, because they will create political instability and discomfort among the people. We do not want to merely speak rhetorically, but this matter must be realised, especially by the leaders above, to take good action to resolve this problem.
Your time is up, Honourable Member. Please conclude, Honourable Member.
Give me one more minute. I am about to wrap up now, Mr Speaker.
Repeated pressure to hasten the general election will only cause investors from outside to worry about investing in the state of Johor. Because it actually shows the weakness and instability of the government currently leading the state of Johor. We know that those who are making noise with political provocation today, who supposedly want to hasten the general election or state election, are the group that lost in the last GE14. They do not hold any positions or places as the government today. That is why they want to hold the GE immediately, because they want to try their luck in the election to enable them to obtain positions if they win later.
As a State Assemblyman who is a party leader within his own party, I humbly request that all Honourable Members advise party members and leaders to stop all political provocation that may trigger this political instability. We must respect the people who are struggling with the difficulties of life resulting from the effects of the COVID-19 calamity. Moreover, most importantly, we must respect all efforts made by the federal government under the leadership of the Right Honourable Prime Minister, which is taking the country out of this COVID-19.
Thank you, Honourable Member, your time is up.
I have one more point to make, but however much I would like to, I abide by the order of Honourable Mr Speaker. So, I will give a pantun:
An old man walks with a cane, the distant jungle seems near, if we are of one accord, the tiger in the forest can be bound.
(House applauds). With God's guidance and blessing, peace and the mercy and blessings of God be upon you.
Which side is that tiger on, Honourable Member?
Plenty near Kempas.
Okay, Honourable Parit Yaani, please.
Assalamualaikum warahmatullahi wabarakatuh. (Selawat). Mr Speaker and all Honourable Members of the House. Alhamdulillah, the House is finally able to sit as usual after the change of government from Pakatan Harapan to a backdoor government, as stated by the Member of Parliament for Marang or Perikatan Nasional.
As everyone is well aware, throughout the Movement Control Order (PKP), the House has not been able to sit as usual. Had the House been able to sit as usual, the function of the august House, the place where people's representatives debate everything relating to the interests of the people and the state, would have been carried out freely without the restriction of a limited time. The PH government was often given various names, among them the "kencing" government, the "hancing" government and the hypocritical government, on the pretext that it had supposedly failed to fulfil its promises. However, with those who have no promises but become a government without the people's mandate, as stated by the Honourable Prime Minister himself, is that enough on the grounds that we are people who are responsible to the people? If so, at the next general election, parties would not need to present any manifesto. Even if there is a manifesto, after winning they could simply discard it on the mere pretext of acting for the people.
The hard efforts of the PH government to ensure checks and balances in the management of the country were thwarted after the motion to limit the term of the Prime Minister was withdrawn by the PN government without any reason. This step of cancelling the motion to limit the term of the Prime Minister should be seen as a step backwards, because today other countries have limited the tenure of their heads of state to only two terms in order to witness positive effects on the good governance of the country. We have had the experience where there was no tenure limit for the head of state; it is not impossible that cases like 1MDB could recur. Insya-Allah, we intend to limit the tenure of the Menteri Besar to two terms, if we are permitted to govern the state of Johor again.
The PH government also began an initiative to strengthen the august House, so that power does not rest too heavily on the Legislative Leader or the EXCO line-up but also on those who represent the people. We are aware that previously the sitting was held for only half a day, whereas it was very necessary for Members of the House to debate additional allocations for the people during the Movement Control Order period, so that Members would know the expenditure and the sources of the government. However, that matter has passed. Today we are able to sit as usual after the PH government was seized mid-way, during which it caused great hardship to the people in facing a critical situation, such as the replacement of officers, including village heads, which was terminated before the due period on 31 December. As a result, most of the affected village residents are left wondering who the individuals are that can help manage their welfare. This is the result when certain groups betray the people's mandate and other groups take advantage to seize power in the state and the country without regard for the effects on the people, even though in fact they lost in the last general election.
Mr Speaker, the achievements of PH Johor. Previously, under the PH administration of the state of Johor, we carried out various welfare programmes that had a good effect on the people, especially the B40 group, such as the Kad Sihat, and the ownership of low-cost houses by lottery rather than directly to members of a party. The abolition of the KMK, Kuota Menegak Kerajaan, Takaful Warga Emas, 10 cubic metres of free water and many other specific facilities that had never been provided during the 60 years of the previous BN government were implemented during the PH administration, including the establishment of Universiti Johor, which is still under development. This is a good thing because of efforts to safeguard the people of Johor, despite sabotage by those with vested interests while that group was in the PH government. However, we are striving to realise the objectives or offers of PH Johor during the PRU14 campaign, which were aimed at the prosperity of the people.
This is a source of pride gained by the leadership under PH, and I hope this excellence can be continued by the current government for the sake of uplifting the people who are waiting in hope amid the hardships and challenges faced at this time. In general, the people today are experiencing COVID-19, which has occurred and continues, and we do not know until when. The process of enriching the people must continue. Even though this new government has not put in place any manifesto that can serve as a guide to its commitment to the people in earnest. This matter is feared to become an excuse for the present rulers to avoid making any progress in safeguarding the welfare and well-being of the greatest number of people.
Good and transparent governance. Mr Speaker, as a step towards good and transparent governance, I would like to propose, as in previous practice, that we do not permit any individual to hold more than one salaried appointment paid from government accounts. Today, I have received information, and Parit Yaani has received information, that this policy is no longer being practised by the PN government. For example, there is a council member who is also a coordinator of a State Assembly constituency. Imbalanced governance also occurred at the federal level, where there was a Minister who breached the quarantine order, but the fine or compound imposed on him was not commensurate with the punishment imposed on ordinary people. Such practice should not be done, all the more so by those who supposedly use the constitution, Malay symbolism and Islam as the basis of their struggle, because this gives a flawed picture of both institutions concerned.
The importance of political stability. Mr Speaker, we all recognise the importance of political stability, which ought to be the pillar for strengthening leadership institutions in safeguarding the people of this state. Political instability, as is happening today, will cause the various agendas that the government wishes to implement for the benefit of the people to be achieved less than perfectly. This instability forces state leadership to work hard to keep their allies from switching sides, to the point of jeopardising the government in place today. Therefore, how will the people enjoy governance that is not, good governance, if this matter continues to happen? This is the consequence when a government is seized mid-way, not through the democracy that should be. Today, these groups are busy shouting and demanding that elections be held, when the very ones who are shouting are the ones who are destroying the democratic system and elections by seizing them mid-way. Surely after this, if they lose, the practice of buying and selling people's representatives will happen again, and once again the government will change, and it is the people who will bear the consequences, because political stability does not appear when priorities are directed towards the interests of State Assembly Members or Parliament in order to buy their support. The voice of the people will surely die and go unheard as a result of the government's priorities focusing only on people's representatives
who switch sides. This is the question we want this august House to address by enacting laws to prevent people's representatives from switching parties at will.
Parit Yaani is confident that we all want the rights and interests of the people to continue to be protected, and not for the interests of a handful of leaders alone to be prioritised. The people are now seen as not being the concern of the government, as they are now more preoccupied with keeping the number of State Assembly Members than with safeguarding the interests and livelihoods of the people as a whole. This situation will cause the agenda of developing the people to fall further behind. Moreover, in a situation where the people desperately need assistance from the government because of the COVID-19 calamity that has struck the country. Wastage will surely occur in maintaining the priority positions of the Menteri Besar and the EXCO line-up, and in choosing the wishes of those who may switch sides. Parit Yaani calls on the government that the rights and interests of the people continue to be prioritised, and that the damaged democratic system be restored, since this seizure of power was carried out by them or by this backdoor government.
Mr Speaker, it has been 10 minutes, Honourable Member. Can you conclude?
Economic focus. Mr Speaker, in this difficult situation, Parit Yaani would like to request that this august House increase the allocation for the up-skilling and re-skilling programme from RM600,000.00 to RM6 million. Why? Because of the issue of declining income for those who are self-employed and salary cuts for those who work in the private sector. Some have even lost their jobs because of the COVID-19 pandemic that is currently striking the world. Parit Yaani also proposes that the government consider increasing the allocation to, specifically, the State Assembly Members (ADUN), which matter will be returned to the people. This allocation should also be given to all ADUN, not only to government ADUN but including opposition ADUN, in line with the role and trust given by the people to their representatives.
Mr Speaker, we understand that previously the government had set up several initiatives for people affected by COVID-19. That is why PH gave its support to the proposal put forward by the Honourable Menteri Besar, the Ihsan Johor Economic Stimulus Package, because we are confident and believe this can be given to them, that is, to all the people. In addition, the government is also hoped to be more earnest in helping people who have lost their jobs. We hope that the government will obtain detailed information from agencies and departments to obtain records of those who have lost their sources of income as a result. The government should not remain silent and allow this matter to become a cancer, to the point where people today are forced to carry out work that breaks the law just to put food on the table, because of the loss of their sources of income. The people need leaders who are sincere on the issue for the continuation of their lives, not a fool who is only good at playing the wayang kulit, recounting matters of race and religion. Parit Yaani calls on the government to be serious in addressing this problem.
Mr Speaker, Parit Yaani would like to remind this august House to reject any elements and attempts to divide the unity of the people and destroy the harmony of the various races and ethnicities that have existed for a long time in this country. Parit Yaani would like to state that the people must be prioritised, since in this increasingly pressing situation the people need the attention of the government more. Parit Yaani also wishes to remind the government not to be arrogant, and with the power they now hold, the government must be magnanimous and big-hearted, ready to listen, cooperate and discuss with all parties in order to develop and safeguard the people of our state. Do not be like a bamboo fence that guards only itself, concerned only with one's own interests, to the point of forgetting the responsibility that has been placed upon you. In closing, I will read some pantun. I am not good at pantun, but people have written them, so I must read them.
If you manage to block the belida, / the fish caught in the net will wriggle further in; / if treachery nests in the breast, / a close bond can be broken.
The shaman frets as he gnaws at nails, / the stingray cures the princess in seclusion; / alas, the fate of my race, / envy and treachery have become a habit.
Bathing halfway, the lady wraps her sarong, / the maiden darts straight to the clothesline; / envy and treachery are the practice of the devil, / why is the remedy left neglected.
Belanak fish covered on the serving dish, / the dish woven by Pak Mahat; / do not praise the treacherous person, / the more he is praised, the more wicked he becomes.
Thank you. Assalamualaikum warahmatullahi wabarakatuh.
Honourable Mr Speaker. First of all, on behalf of my government, I would like to record our highest congratulations to Mr Speaker, who over these two days of sitting has conducted the proceedings in a very professional and fair manner. Congratulations, thank you Mr Speaker. (House applauds.) I would also like to record my highest thanks to the Honourable Member for Kempas and also to the Honourable Member for Parit Yaani for the criticisms and matters that they have raised. I stand in this august House to say that the state government is committed and will be earnest in carrying out whatever responsibilities rest upon our shoulders together. The matters raised, whether touching on unemployment, expediting appointments, including to defend the fate of workers who have lost their jobs or who are facing various pressures, to the extent that we need to look at counselling aspects, and whether we need to look at opportunities to be provided to all parties affected by this COVID-19, insya-Allah, we will implement these in the best possible manner. Crime is also a matter raised by the Honourable Member for Kempas. Rest assured that in the state of Johor we have a Chief of Police, Dato' Ayub Khan, who speaks every day in the newspaper and electronic media; the Chief of Police of Johor is very popular in combating various crimes. We take note of the recent news that 177 students tested positive for drugs in drug tests. This is also a challenge for us to look at this matter together and find a way to solve it.
I thank the Leader of the Opposition from Parit Yaani for what was raised, and of course the matters raised are not so difficult for us to implement together, insya-Allah. I too, like the Honourable Member for Parit Yaani, am not very good at pantun; I only have friends who give me lines of pantun. Fight the Johor way, a pure silaturahim, the same in mouth and in heart, forgiveness always answered, hands extended and clasped, and the wounds no longer scarred.
Thank you, Honourable Mr Speaker. (House applauds.)
Okay, thank you, Honourable Menteri Besar. Honourable Members, I adjourn this House to a date to be determined. Thank you, wabillahitaufik walhidayah, assalamualaikum warahmatullahi wabarahkatuh.
The sitting was adjourned at 3.45 p.m.
Duty Officers:
Clerk: Cik Hajah Shubanah binti Yusuf, SIJ., PIS.
Assistant Clerk: Encik Hasnul Atmam bin Othman; Puan Farrah Diana binti Mohammad
Coordinator: Puan Hajah Norela binti Osman
Publication Assistants: Puan Malina binti Mohd Nasir; Puan Noraisah binti Mohd Yusof; Encik Ariff bin Abu Bakar
Operations Assistants (Bentara): Encik Razine bin Sulaiman; Encik Hamdan bin Markom; Encik Norhayadi bin Hussien; Encik Muhamad Khirunizam bin Pahmi; Encik Mohd Norazri bin Kasim; Encik Mohd Sapri bin Manan; Encik Muhamad Khairul Asyraf bin Abdullah; Encik Muhammad Khairul bin Arop
Office Secretaries (House Reporters): Puan Hajah Zalinah binti Ali; Puan Hajah Azlin binti Bahrin; Puan Hajah Saniah binti Kassim; Puan Hajah Rumiah binti Sumirono; Puan Junaidah binti Paing; Puan Nor Dalilah binti Dahlan; Puan Siti Rojimah binti Abd. Razak; Puan Hajah Haironisha binti Zainal Abidin; Puan Fareza binti Musa; Puan Shuriati binti Abdul Hajar; Puan Norlydialina binti Isnin; Puan Norazilawati binti Masri; Puan Siti Rohani binti Ahmad Suhaimi; Puan Raihanah binti Ismail
Recording: Encik Nor Risam bin Esa; Encik Azizan bin Md. Sidi; Encik Khairul Anuar bin Umar Usman
Video Audio Operators: Encik Noorazhan bin Mohd Salleh; Encik Ismail bin Abu Bakar