Kelantan · 27 November 2024

15th Assembly, 2nd session, 3rd meeting (Budget) · 115 turns · 11,225 words · official PDF ↗ · Digital Hansard ↗

107 of 115 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalKelantan publishes one PDF per meeting for the current assembly; of the previous one only March 2023 (and July 2022, from the Wayback Machine) survive. The November 2023 budget meeting is not published. Written answers: 2025 only.

(Opening)

SecretaryEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah.

Third Meeting (Budget) of the Second Session, Fifteenth Kelantan State Legislative Assembly, Fifth Day. ……

PRAYER

SecretaryEN

[ STANDING ]

Notified QuestionsQuestions

SecretaryEN

Order of Business for the Second Sitting, Notified Questions.

Notified Questions — Questions Submitted for Oral AnswerQuestions

Deputy SpeakerEN

The Honourable Member for Paloh is invited to speak.

Dato' Shaari bin Mat HussainBERSATU · PNPalohEN

Honourable Dato' Speaker, I seek an answer to my Question No. 1.

Question 1:

Asks YAB Ustaz Dato' Panglima Perang Menteri Besar to state what long-term efforts and planning the Kelantan State Government has undertaken to boost development around the ECRL terminal/station area, which is expected to be completed in 2026?

Dato' Dr. Izani bin HusinPAS · PNKijangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Honourable Dato' Speaker, I seek to answer on behalf of the Honourable Dato' Timbalan Menteri Besar… got stuck in floodwaters… there is no one else to…

In boosting development around the ECRL Terminal Station area, which is expected to be completed in 2026, the Government, through several Economic Accelerator Projects (EAP), has planned and taken the following actions:

a) Development around the Bandar Baru Tunjung Station. We have 2 stations, one station in Tunjung and one in Pasir Puteh. So, development in Tunjung is the development of government and educational institutions currently taking place.

b) Commercial and mixed development, including otocity, small and medium industries (IKS), housing, hospitality and commercial centres.

c) Thirdly, supporting the Transit Oriented Development (TOD) network through the implementation of the KB Sentral project and also the ECRL Station. Improving the level of coverage on the roads of Bandar Baru Tunjung through the development of internal roads in Bandar Baru Tunjung and the widening project of existing federal roads.

d) Furthermore, the development of a new smart city concept, namely Madinah As-Salam and Madinah Ramadhan as centres for mastering Islamic knowledge.

e) Furthermore, development of the station area around the ECRL Pasir Puteh Station. The ECRL Pasir Puteh Station will function as a Cargo Oriented Development (COD) and Transit Oriented Development (TOD).

f) Other supporting development, including the development of the Tok Bali industrial area or Tok Bali Industrial Park. The development of the Tok Bali fisheries port area or Tok Bali Fisheries Park.

g) Mixed development around the ECRL Pasir Puteh Station area. Mixed development by PKINK. Proposed development of the Inland Port Tok Bali, a spurline from the ECRL Pasir Puteh Station to Tok Bali to support trading activities. Thank you.

Deputy SpeakerEN

Please proceed, Paloh, supplementary question.

Dato' Shaari bin Mat HussainBERSATU · PNPalohEN

Thank you, Honourable Dato' Speaker. My supplementary question is what mechanisms and planning have been carried out by the State Government with developers so that development in Tunjung is not disrupted. Thank you.

Dato' Dr. Izani bin HusinPAS · PNKijangEN

Thank you, Honourable. There are several mechanisms and planning carried out by the State Government with developers so that development in Tunjung is not disrupted, as follows.

The State Government has established a regulatory committee to plan and coordinate development project activities in the State of Kelantan under JKMPP. This committee gives immediate approval to development plans for any high-impact project such as in Bandar Baru Tunjung. Development in Tunjung involves many individually owned land lots, and it involves a land acquisition process.

Therefore, to expedite the process, the State Government has established a special land acquisition task force unit under the Office of the State Director of Lands and Mines of Kelantan, for the purpose of speeding up the process of land repossession, particularly in Bandar Baru Tunjung. Once developers obtain ownership, the developers concerned must begin their development or buildings within a certain period from the date the developers receive ownership. This condition is provided in the agreement between the developer and Perbadanan Bandar Baru Tunjung (AUDIO NOT WORKING), and if any of the said conditions are breached. Thank you.

Deputy Speaker

Silakan Salor.

Tuan Saizol bin IsmailPAS · PNSalorEN

Thank you, Dato' Speaker. Actually, the question is for the TMB. Since Tunjung itself is one of the areas involved in my own State Constituency (DUN), namely Salor. So my supplementary question is whether the Government intends to make Bandar Baru Tunjung itself a fully smart city, with complete digital infrastructure facilities and a solid waste management system. That is my question, given its impact on the residents of my DUN. Thank you.

Dato' Dr. Izani bin HusinPAS · PNKijangEN

Thank you, Salor. Salor could have asked my deputy, the Exco, instead. But since he asked the TMB, then okay. The State Government indeed plans to develop Bandar Baru Tunjung as a smart city, in addition to other towns in the State of Kelantan, to achieve sustainable progress and meet the needs of future society.

This effort is in line with the planning document for the Bandar Baru Tunjung 2035 Special Area, which sets out the concept of a smart Islamic city or intelligent Islamic urbanism, namely urban development that integrates Islamic elements with smart city applications. At present, several initiatives are being implemented by the State Government through PLAN Malaysia Kelantan and the Local Authorities (PBT), including the Kelantan State Smart City Blueprint 2040 and the MPKB-BRI Smart City Action Plan.

The preparation of these blueprints and action plans aims to ensure systematic planning and development that supports the national aspiration of becoming a smart nation. Among the main features planned for smart cities in Kelantan are the development of green, environmentally friendly energy, including the use of solar energy in energy-saving systems; the provision of digital infrastructure such as 5G networks for fast and efficient communication; the implementation of a smart waste management system using monitoring and waste generation technology; and the improvement of transport networks and smart mobility to facilitate the movement of residents.

UPEN has also established a sustainable master plan. Meanwhile, PLAN Malaysia is completing a comprehensive study for the smart city blueprint. This step is a manifestation of the commitment of the State Government and the PBT to improve the quality of life of the people, making it more modern, comfortable and environmentally friendly, and keeping pace with the development of green technology. Thank you.

Deputy SpeakerEN

I invite Kemuning to speak.

Tuan Saizol bin IsmailPAS · PNSalorEN

Honourable Dato' Speaker, I seek an answer to Question No. 2.

Question 2:

Asks YAB Ustaz Dato' Panglima Perang Menteri Besar to state what efforts the Kelantan State Government has made in providing assistance and facilities needed by paddy farmers in this state.

Dato' Hj. Wan Roslan bin Wan HamatPAS · PNPengkalan KuborEN

Honourable Dato' Speaker, the Member concerned is stranded by floods.

Deputy SpeakerEN

If there is a representative from the Government who can provide the answer, please proceed.

Dato' Hj. Wan Roslan bin Wan HamatPAS · PNPengkalan KuborEN

Honourable Dato' Speaker, the efforts of the Kelantan Government in providing assistance and facilities needed by paddy farmers in this state are carried out through several agencies, as follows:-

a) IADA Kemasin Semerak, which provides assistance in terms of gotong-royong programmes involving paddy farmers and officers from IADA Kemasin Semerak. The gotong-royong programme includes the control of rats, diseases and weeds, where IADA Kemasin Semerak provides pesticides suitable for the gotong-royong activities.

b) Secondly, implementing programmes towards more efficient paddy crop management, among them the Large-Scale Smart Paddy Field (Smart SBB) programme. The Smart SBB programme is one of the Government's initiatives to consolidate paddy field land management on a centralised agricultural basis so as to optimise the use of resources and improve the efficiency of planting and post-harvest production activities, and to increase yield and, in turn, farmers' income.

c) Thirdly, providing courses and training to paddy farmers and participants of the Food and Agro-Based Industry (IMAT) for the improvement of knowledge and skills, adoption of the latest technology, practising good agricultural practices, improving product quality and more efficient business management.

d) And fourthly, providing equipment and machinery loan facilities for use by paddy farmers in the field, such as paddy threshers, combine harvesters, axial pump drones and other related items.

e) Fifthly, implementing a liming programme for selected paddy lots. This aims to ensure that the soil pH level is stable and suitable for paddy planting activities.

f) And sixthly, implementing a paddy field levelling programme to improve soil uniformity, facilitate water management and control, and increase agricultural yield. Overall, by implementing this paddy field levelling programme, farmers can increase productivity and efficiency in their agricultural activities.

g) And seventhly, providing and increasing the number of mobile pumps in the service areas to cater for the existing irrigation capacity, with an allocation of RM1 million.

h) Increasing the number of diesel pumps, screw pumps, tube wells with a depth exceeding 100, as well as axial pumps to cater for the existing irrigation capacity, with an allocation of RM1 million.

i) Ninthly, maintaining damaged irrigation infrastructure so that the irrigation system runs well and smoothly, with an allocation of RM6.8 million.

j) Tenthly, IADA Kemasin Semerak will continue to work actively with the Agricultural Irrigation and Drainage Division (BPSP) to ensure the construction of paddy irrigation systems in incomplete irrigation schemes in the district of Pasir Puteh can continue until they are completed. To date, 3 tenders are in the procurement process for the development of irrigation schemes, namely the Semerak Hilir Scheme, the Sg Yong Scheme and the small schemes around Gong Layak Tengah, Gong Layak Besar and Gong Lesong. These three tenders are estimated to be worth RM130 million. This Gong is a high place, not Gong Tok Cerdik.

k) Eleventhly, mobilising Area Development Agents actively and effectively so that more efficient information, technology and approaches can be conveyed to farmers.

Meanwhile, the Kelantan State Agriculture Office, the State Government through the Kelantan State Department of Agriculture, manages paddy areas outside irrigation schemes, namely outside the Jelapang, by providing development allocations under the Paddy Industry Development Programme received under the 12th Malaysia Plan (RMK-12), amounting to RM1.8 million, earmarked for paddy areas outside the Jelapang. For 2024, RM400,000 has been allocated by the State Government to assist 68 paddy farmers covering an area of 245 hectares of paddy land. The allocation is used to improve yield and farmers' income through land rehabilitation work, providing groundwater, pump supplies and other infrastructure.

In addition, RM1.1 million was received from the federal government to carry out liming work on paddy areas in five districts covering an area of 1,000 hectares involving 394 paddy farmers. Apart from that, the Paddy Crop Disaster Fund (TBTP) also helps farmers affected by disasters, whether drought, floods, or attacks by pests and diseases. Until October 2024, an allocation of RM11.945 million has been received, involving 5,872 paddy farmers affected by natural disasters such as floods and drought.

Meanwhile, KADA, irrigation and drainage infrastructure facilities: KADA provides irrigation and drainage infrastructure facilities to farmers to channel water into paddy plots. KADA has 3 main pump stations, namely the Kemubu Pump Station, the Lemal Pump Station and the Kasa Pump Station. These three pump stations function to pump water from the Kelantan River and then irrigate the paddy fields. KADA will also maintain this infrastructure from time to time to ensure the water supply to paddy fields runs well and in an orderly manner.

Meanwhile, paddy fertiliser assistance: KADA provides subsidised fertiliser assistance to paddy farmers under its supervision to ensure the paddy can grow well and be of the best quality. For the 1/2024 season, KADA has supplied subsidised fertiliser assistance totalling 555,121 bags to 7,439 farmers within the KADA area. This fertiliser includes 147,673 bags of NPK fertiliser, while urea fertiliser totals 114,853 bags and compound fertiliser totals 292,595 bags. The total allocation is RM25,908,264.80.

And pesticide incentives: KADA also provides pesticide assistance to paddy farmers. These pesticides are supplied in various brands and types to prevent paddy plants from various diseases and attacks from pests such as insects and others. In the first season of 2024, KADA allocated RM4,800,062.26 for providing pesticide incentives to paddy farmers within the KADA area.

Meanwhile, drought and flood assistance to farmers who suffered crop destruction due to drought and floods: KADA has also provided disaster assistance in the form of cash to them. For example, KADA has provided an allocation of RM9,790,613.64 to 4,616 farmers who suffered misfortune.

Meanwhile, cash assistance to paddy farmers to ease the burden and protect the welfare of paddy farmers, the Ministry of Agriculture and Food Security (KPKM) has provided the Paddy Farmers Cash Assistance of RM600 to each paddy farmer, where this allocation of RM200 a month will be distributed over a period of 3 months or one planting season. For phase 2/2023, KADA has allocated RM4,321,200 for this purpose, involving 7,202 farmers receiving it. Thank you.

Deputy SpeakerEN

Please proceed, Kemuning, supplementary question.

Tuan Saizol bin IsmailPAS · PNSalorEN

Thank you, Dato' Exco, for the answer. Firstly, I say thank you, and I take this opportunity to thank the Honourable Dato' Exco for the assistance and allocations, especially for Salor earlier during the drought crisis in our state, such as the "Tube Well" assistance, for example. However, as explained a moment ago, may I know the latest developments regarding the status of the Kemubu Pump House, which is reported to be in the process of repair. Thank you.

In the name of Allah, the Most Gracious, the Most Merciful.

Honourable Dato' Speaker, thank you for the supplementary question from Salor. Several constructions or repairs are being carried out by KADA. First, building and completing the Kemubu Pump Station 3 and related works within the KADA area of the Kota Bharu Selatan district. Kemubu Pump Station 3, with an intake level of 2.0 metres and above, can resolve about 60% of the low-water problem at the Kemubu Pump Station compared with the existing pump stations, namely Kemubu 1 at 4.9 metres and Kemubu 2 at 3.4 metres. Pump Station Kemubu 3 can draw water at 2 metres water level. This project was awarded on 28 March 2023 with an expected completion in 2025, next year. The latest status is that work on site is actively being carried out.

Secondly, rehabilitating the temporary ship pile barrage of the Kemubu irrigation infrastructure and other related works for the Kemubu KADA Kelantan irrigation scheme. The purpose of the ship pile repair works is to raise the Kelantan water level to above 4.9 metres consistently so that all pumps at the Kemubu Pump House 1, 2 and 3 can function properly. At present, the water level of the Kelantan River, before this flood, is very high today. That means 2-3 weeks ago, it was about 3 metres, which prevented all pumps from being used, but today the water is already higher. The flood water has already arrived. So the latest status is in the process of applying for the NOC to order allocations for stability studies and the appointment of consultants for that purpose. That means it is in process, In Shaa Allah.

Thirdly, designing, building and completing a mobile pump system and related works for irrigation at the Kemubu and Lemal Pump Stations of KADA by direct negotiation. This contract has been awarded to Ari Usaha Murni Sdn Bhd. The date of site handover was 21 October 2024. On 21 October 2024, a site handover meeting was held between KADA management and Ari Usaha Murni Sdn Bhd at the KADA Office. A coordination meeting discussing CPM and technical matters was held last Thursday, 14 November, where the latest status of implementation is preliminary work on site, In Shaa Allah.

Perhaps with the new KADA chairman's management, it will move faster and better, In Shaa Allah.

Deputy Speaker

Silakan Mengkebang.

Tuan Zubir bin Abu BakarPAS · PNMengkebangEN

Thank you, Dato' Speaker. My supplementary question is, since Machang is my neighbour and there is no Machang representative here today because it is submerged by floods, what is the status of the implementation of the agricultural water supply project for paddy farmers at Kampung Selimbar Guntong, Kemuning Machang. Okay, thank you.

Honourable Dato' Speaker, thank you for the supplementary question from Mengkebang. The question is on behalf of Machang. Alhamdulillah, the work to build the irrigation system and related works at the Selimbar Guntong paddy fields, Machang, has been completed by the team of the Kelantan State Irrigation and Drainage Department. With an allocation of RM241,000, the project was implemented in mid-July 2024 and completed at the end of October 2024. With the implementation of this project, a total of 25 paddy farmers in the area will benefit in the production of paddy crops in the area. In Shaa Allah, the Agriculture Department will also continuously monitor paddy planting activities and the welfare of the paddy farmers in the area with related input assistance. That is all, thank you.

Deputy SpeakerEN

I invite Melor to speak.

In the name of Allah, the Most Gracious, the Most Merciful.

Peace be upon you, and the mercy and blessings of Allah, the Exalted.

Honourable Dato' Speaker, I request an answer to my question No. 3.

Question 3:

I ask the YAB Ustaz Dato' Panglima Perang, Menteri Besar, to state the area of state government land used by Tenaga Nasional Berhad for the purpose of building various utility facilities such as TNB substations, transformer stations, and high-voltage cable alignment routes in the state of Kelantan. Is the state government prepared to impose any form of payment or compensation for the use of the land in question?

Honourable Dato' Speaker, thank you to Melor. The State Government has passed the Kelantan State Utility Infrastructure Land Access and Use Rights Enactment and established the Infrastructure Corridor and Geospatial Information System Division, under the Kelantan State Secretary's Office, for the purpose of identifying and imposing appropriate charges for the use of land by TNB or any utility provider for the provision of utility infrastructure. Accordingly, appropriate charges will be imposed based on the land area, the type and purpose of the structure, and the period of use.

Specifically, as far as TNB is concerned, the land area given to TNB is 122.84 hectares, and the annual charge to TNB for the access purpose is RM839 541 a year. Previously, before this Access Enactment, we used the PTG regulations to impose charges on users, namely the Director of Land and Mines Circular Number 5 82 Circular 19, and so on, we used the circulars. That is all for now, thank you.

Deputy SpeakerEN

Melor, please go ahead with your supplementary question.

Thank you, Honourable Dato' Speaker, and thank you, Honourable Dato' Exco, for that answer. My supplementary question is: apart from the charges imposed for the building of these transformer stations, does the government impose any charges for the use of rivers for dams such as the Nenggiri Dam and others?

Thank you, Melor. The short answer is yes. To be longer... a bit longer, we have a specific agreement between TNB and the Kelantan State Government regarding water royalties, the use of water royalties and water royalty charges to the government by the Nenggiri Dam. These include the use of the tunnel, which is more than RM500 000 a year, water usage royalty of RM3.2 million, and a water reservoir licence of RM11 500 a year. These are the charges contained in the agreement between the State Government and Nenggiri. However, since the project is not yet completed, no charges are being imposed yet. Later, once it is done, we will charge, In Shaa Allah. Okay, thank you.

Deputy SpeakerEN

Please go ahead, Wakaf Bharu.

Tuan Haji Mohd Rusli bin AbdullahPAS · PNWakaf BharuEN

Peace be upon you, and the mercy and blessings of Allah, the Exalted.

Honourable Dato' Speaker, my supplementary question is: what incentives will the government provide to residents who wish to switch to solar? Thank you.

Thank you, Wakaf Bharu. That question requires notice, we cannot answer it now. We will send a written notice, In Shaa Allah.

Deputy SpeakerEN

I now invite Pasir Tumboh.

Dato' Haji Abdul Rahman bin YunusPAS · PNPasir TumbohEN

Peace be upon you, and the mercy and blessings of Allah, the Exalted.

Honourable Dato' Speaker, I request an answer to my question No. 4.

Question 4:

I ask the YAB Ustaz Dato' Panglima Perang, Menteri Besar, to state: what is the government's strategy to strengthen the promotion of KIAS in efforts to attract international students?

Dato' Hj. Wan Roslan bin Wan HamatPAS · PNPengkalan KuborEN

Honourable Dato' Speaker, thank you to Pasir Tumboh for taking an interest in KIAS. Among the government's strategies to strengthen the promotion of international student admissions to KIAS is helping KIAS plan direct promotional activities at selected schools in several districts in Thailand. For example, we have carried out a student exchange recently with several schools in Thailand and also Cambodia that use our syllabus. For instance, for the SMU examination alone, there are about 400 candidates from Cambodia. Indonesia and Singapore, by holding briefings for the targeted students, because by entering KIAS, they will obtain a Bachelor's Degree if they do not wish to complete their studies at KIAS. They can study at KIAS for 3 years to obtain a diploma, and can continue to Al-Azhar, Egypt, for Year 3 and Year 4. That is a facility, or we obtain recognition from Al-Azhar, Egypt, together with KIAS. In addition, through official relations with organisations, foundations, jam'iyyah, NGOs and also educational institutions in the target countries, in terms of promotional relations and also obtaining scholarship sponsorship for international students. Thank you.

Deputy SpeakerEN

Please go ahead with your supplementary question, Melor. Sorry, Pasir Tumboh.

Dato' Haji Abdul Rahman bin YunusPAS · PNPasir TumbohEN

Thank you to the Government for answering my question No. 4 just now. And let me introduce myself first, Honourable Dato' Speaker. KIAS happens to be located within the Pasir Tumboh State Constituency, and when I studied before, I studied overseas, and there are some things I feel we need to take from students of countries, especially in Madinah now. Madinah University, Islamic University Pakistan Islamabad. The way they attract foreign students, especially students from countries we call non-Islamic countries, namely Thailand, African countries and this country. They have specific quotas for those countries with several incentives. My question is, how does the Government plan to introduce KIAS widely, especially at the international level? One question... and the second question, are there any special allocations or incentives provided to attract admission of students from foreign countries? Thank you.

Dato' Hj. Wan Roslan bin Wan HamatPAS · PNPengkalan KuborEN

Thank you, Honourable Dato' Speaker, for Pasir Tumboh's supplementary question. He is concerned about his area, and we also hope for his cooperation, to give more allocation to KIAS for our students' activities. So, to introduce KIAS on the international stage as a higher education institution of choice, KIAS has collaborated with institutions of higher learning and international bodies, whether academic or non-academic collaboration.

Early this year, KIAS signed a memorandum of understanding with the Japan Dakwah Centre based in Osaka. We also want to bring Japan in, because in the Government's answer there is a lot of cooperation with Japan. So, Japan is for industry exposure through dakwah to non-Muslims there. Next, strengthening the relationship of understanding with Jinan University, Guangzhou for Mandarin Chinese studies, and the placement of students at Ez-Zitouna University, Tunisia. So, at the beginning of this new year, together with the Honourable Dato' Panglima Perang, we have signed an MOU with Ez-Zitouna University, Tunisia, where they agreed that KIAS graduates can continue to degree level at Ez-Zitouna University, Tunisia. And with Jinan, we made an MOU, and firstly we taught Chinese to our YB. So the YB began classes at KIAS as a promotion that our YB, who is not Chinese, can already speak Chinese. Many in this House today, even before this, have started speaking Chinese. That is a good development as a promotion, and a working visit as mentioned earlier, together with the Menteri Besar.

At the same time, KIAS has been involved in the participation and organisation of international seminars, both domestically and abroad, and plans to expand networks with Thailand, Cambodia, the Philippines, and explore the market of Muslim brethren in China. All these efforts are carried out to introduce KIAS to the international community. Meanwhile, the incentives provided are in the form of tuition fee waivers. So the allocation that is there, that's all for now... what they want... what they can afford, namely tuition fee waivers for students who achieve the highest level of excellence. It can be a high tuition waiver. Followed by tuition fee reductions according to their achievement.

They are also offered the opportunity to continue their studies at a higher level at KIAS with attractive tuition fee discounts. After KIAS, if they want to continue further, we provide discounts and attractive reductions so that they complete their degree at KIAS. And a new field, we also open studies at the KIAS level to Master's level. And In Shaa Allah, we are working towards reaching PhD level. So I invite all the Honourable Members to pursue Master's studies, and In Shaa Allah, a little later at PhD level, they do not need to travel far, they can go nearby and commute every day. Thank you, Honourable Dato' Speaker.

Deputy Speaker

Silakan Galas.

Thank you, Honourable Dato' Speaker. Congratulations to the State Government for organising Chinese language classes for all the Honourable Members, but they did not invite Galas and others. Galas also wants to learn Chinese.

Honourable Dato' Speaker, I praise the efforts of KIAS, which has appointed the Narathiwat Islamic Religious Council as KIAS's representative to promote student recruitment, to qualify students for KIAS. My question so far, Honourable, is to what extent can student recruitment be done, especially students from Narathiwat, and just now there was mention of flexible financing for these students. I think that is a good effort. The second question, KIAS targets 2,000 students to achieve full university status. So far there are 1,200, we need 800 more, so in the Honourable Member's view and knowledge, how far or how long will the effort to become a full university take to be achieved. Thank you.

Dato' Hj. Wan Roslan bin Wan HamatPAS · PNPengkalan KuborEN

Thank you, Honourable Dato' Speaker. From Galas, we have people who want to go and learn Chinese and Arabic, which is possible because we have the International Language Institute at KIAS (IBA), not just Arabic only. So now we are exploring Chinese and Japanese, and so on, it can be various languages. Malay is also available here. So, for this promotion, we have set up a task force for campaigns including overseas. So now we are opening new student registrations. So we do not yet have information on how many new students from overseas there are, we are opening for November to December this month. So anyone who has acquaintances who wish to study in Kelantan at KIAS can do so. The conditions have been issued by the KIAS side.

And so far there are 1,200 students, and we need 800 more, so we are setting up a task force for the campaign. And people call it a fix deposit, we call it the Kelantan Islamic Foundation, because students of the Kelantan Islamic Foundation number 35,000 people, and we campaign, we Kelantanese actually do not really know, we prepare, as I mentioned yesterday, as if it were free education. Because when studying at KIAS, some of our students are afraid of Arabic. After PMR, previously, after PMR, those who feared SMU would run away, not run away, meaning transfer schools. Then, after SPM, they do not want to take STAM because STAM is difficult, they say 13 compulsory subjects must all be passed; if you do not pass one subject, you have to wait a year. So KIAS actually provides a pitah education, meaning after SPM, you can enter KIAS and continue your studies to Al-Azhar, Egypt, because we obtain recognition from Al-Azhar, Egypt. Study at KIAS for 3 years, and you can apply for a YAKIN loan. YAKIN gives a 3-year loan. After completing the diploma, you can continue to Al-Azhar, Egypt.

And now another route we have is to Tunisia, we went recently and received it. And at the end of this month, the Deputy Rector of Zitouna University is coming to Kelantan to see KIAS, our Pondok Moden, where recently we sent 8 of our Pondok Moden students to study at Zitouna, a university that is the oldest in the world. The place of Ibn Khaldun, great, a source of knowledge and learning there. So for those in Egypt, Year 3 and Year 4, they can apply for the YAKIN loan again. And if you get a 3.7 pointer, YAKIN will convert it into a scholarship.

So that is why I said it is as if education is free. So I call on all the Honourable Members to tell their state constituents who do not get offers to public universities, then enter KIAS, In Shaa Allah, we are able to produce excellent students because the teaching staff at KIAS are experts, among the most numerous who hold PhDs, the lecturers at KIAS. So that is our promotion to spread this information and knowledge throughout, especially to our people in the State of Kelantan. Thank you.

Deputy SpeakerEN

I now invite Kota Lama.

Dr. Hafidzah binti Haji MustakimAMANAH · PHKota LamaEN

Peace be upon you, and the mercy and blessings of Allah, the Exalted.

Thank you, Honourable Dato' Speaker. To everyone, I would like to ask, hao ma, my question, please answer question No. 5.

Question 5:

I ask the YAB Ustaz Dato' Panglima Perang, Menteri Besar, to state the status of non-communicable diseases in the State of Kelantan as of 2022 until now, and its comparison with the status of communicable diseases in this state.

Tuan Hilmi bin AbdullahPAS · PNGuchilEN

Ni hao ma dih... hao... ta cha hao. Thank you to Kota Lama for the question. For the information of Kota Lama, who asked about non-communicable diseases and communicable diseases. Two diseases, lah. For the status of non-communicable diseases in the State of Kelantan, according to the latest findings of the Health and Mobility Survey 2015 until 2023, or the National Health and Mobility Survey (NHMS), 4 hari kita duk sebut NHMS, which we have been saying for four days. For non-communicable diseases, this survey found that among those aged 18 and above in Kelantan, diabetes, or kencing manis, decreased from 19.5% in 2019, which is 219,000 people aged 18 and above with diabetes, to 16.3% in 2023.

The survey in 2023 found that 10% knew their diabetes status, while 6.3% did not know they had diabetes... haa, toktahu. Diabetes increases with age, but many do not realise they are facing it. Many people do not know they have diabetes.

Second, hypertency, or high blood pressure, decreased from 37.1% in 2019, 415,000 residents aged 18 and above, to 27.9% in 2023. Patients who did not know their hypertency status decreased from 21% in 2019 to 12% in 2023. These are the results of campaign programmes, especially under the Agenda Nasional Malaysia Sihat (ANMS), where every month every Health Department was directed to hold campaigns. Among other things, these give awareness to the people of Kelantan so that they know the types of diseases and hold regular disease screenings, lah.

And third, hypercholesterolemia, that is, cholesterol, decreased from 51% in 2019 to 34.9% in 2023. However, the rate of this hypercholesterolemia in Kelantan, at 34%, exceeds the national rate of 33%. Also, the prevalence of excess weight among adults remained static, from 28.5% in 2019 to 28.2% in 2023; it is static, with no difference. Meanwhile, the prevalence of obesity, BMI above 30, showed an increase from 16.2% in 2015, 20% in 2019, to 23.4% in 2023. More than half, that is 51% of the people of Kelantan, have weight problems and also obesity. This means half of Kelantan, half of the weight... this includes me too, lah, In Shaa Allah, let it be a motivation for us. It means half, okay, half a bit heavy.

As for teenagers aged 13 to 17%, the prevalence of excess weight among our teenagers remained stable at 15.2%... they start to make more of these teenagers... from 2017 to 15.6% in 2022. Meanwhile, obesity increased from 11.3% in 2017 to 13.3% in 2022. The health issue is long, so it's okay, we will take time to deal with it.

For children under 5, the prevalence of underweight, lack of nutrients, make nugget sausage for these kids, increased from 16.8% in 2016 to 19.6% in 2022. Stunting decreased from 34% in 2016 to 23% in 2022, and wasting decreased from 12% in 2016 to 10.6% in 2023.

This is important for cases of heart attacks admitted to hospitals in the State of Kelantan, where a significant increasing trend is seen, from only 5,669 cases in 2022 to 6,153 cases in 2023. An increase of more than 1,000 people. And also for mental illness, 4.6 residents of Malaysia aged 16 and above experience depression. The number of residents experiencing depression doubled from 2019 to 2023. A doubling in mental patients. However, there are no statistics on mental health problems in Kelantan because of study limitations. We want it, but they said there are no clear statistics. That is for non-communicable diseases; the second is communicable diseases.

Analysis of communicable disease data in Kelantan from 2020 until epidemiological week 45 of 2024, covering the 5 main diseases reported. The first is dengue fever. Second, Covid-19. Third, food poisoning. Fourth, tuberculosis and hand, foot and mouth disease (HFMD). Several important trends can be observed as follows: i. Dengue fever shows a significant increase from 1,227 cases in 2022 to 2,790 cases in 2023. It recorded an increase of 127.3% in 2023, an increase of 127%, lah. In 2024, this year, cases continued to increase by 7.6%, bringing the total to 3,003 cases up to epidemiological week 45. Dengue is significant.

ii. Second, food poisoning showed a consistent upward trend from 910 cases in 2022 to 1,323 cases in 2023, an increase of 45.5%. Cases continued to increase in 2024 by 28.1%, with a total of 1,694 up to epidemiological week 45. Meanwhile, Covid-19 has decreased, lah.

iii. HFMD also shows an encouraging downward trend. Cases decreased from 7,723 in 2022 to 6,552 cases in 2023. A decrease of 14.6%.

iv. Tuberculosis also recorded a more stable trend. Cases increased slightly from 1,138 cases in 2022 to 1,220 cases in 2023. That is an increase of 7.2%.

Overall, Covid-19 and HFMD show a positive decline, while dengue fever and food poisoning need special attention to control the continuous increase.

To overcome this situation, several measures suggested by JKM (the Department of Social Welfare) include, first, the improvement of public health education, strengthening awareness programmes on personal hygiene. Third, food safety and disease prevention. Second, control of mosquito breeding sites. Next, intensify efforts to eliminate mosquito breeding sites to reduce the spread of dengue fever.

And a comparative summary between non-communicable diseases and communicable diseases based on the analysis of both statements just now.

There is a significant difference in trends between non-communicable diseases and communicable diseases in Kelantan throughout the period reported. Overall, several major non-communicable diseases such as diabetes, hypertency and hypercholesterolemia show a positive decline. However, the issues of excess weight, obesity and mental health remain major challenges that require serious attention. And for communicable diseases, there is significant trend variation among the 5 main diseases in Kelantan; food poisoning and dengue fever show a significant increase from 2022 to 2024, signalling the need for more effective control measures.

In conclusion, Kelantan is facing a double burden of disease, where there is an increase in both categories of non-communicable and communicable diseases. The problem of late-night eating culture and eating non-nutritious food needs to be addressed immediately. Facilities for recreation centres, public parks and sports complexes need to be increased so that more people can adopt an active and healthy way of life. A comprehensive and focused approach is needed to address both of these double burdens of disease, in order to improve the health and well-being of the people of Kelantan. Thank you.

Deputy SpeakerEN

Please proceed, Kota Lama.

Dr. Hafidzah binti Haji MustakimAMANAH · PHKota LamaEN

Thank you, Honourable Exco, for the explanation and for the success in reducing some of the statistics on non-communicable diseases. Before my question regarding non-communicable diseases in this state, I would like to draw the attention of the House that 2 days ago, 25 November, was the International Day for the Elimination of Violence against Women, and the start of the 16 Days of Activism against Gender-Based Violence campaign worldwide, until 10 December, which is Human Rights Day. And we know that the most severe violence of this century is murder, or genocide, which now claims 44,000 Palestinians, mostly women and children.

I would also like to record in this House my thanks to the State Government, through the statement of the Deputy Menteri Besar, supporting the call of the Prime Minister of Malaysia to remove Israel from the United Nations, and this is one way we support and uphold. My question is, what are the policies and actions of the State Government to help the mental, emotional, spiritual and physical health... mental, emotional, spiritual and physical health of the 1,670 women victims of violence reported in this state between 2020 and 2023. And my short question number 2, thank you for stating the latest developments on another non-communicable problem, namely stunting, which is hidden hunger, the issue of non-nutritious food that results in stunting, wasting and obesity. So, perhaps it should be explained how we have just succeeded in reducing the rate of stunting, and what steps are suggested to continue to maintain efforts to reduce stunting among children. Thank you.

Tuan Hilmi bin AbdullahPAS · PNGuchilEN

This question is like a doctor asking a lawyer; a lawyer can answer it in a roundabout way, actually. But it is an official question, so we answer officially. I just found out I am not familiar with the issue of violence against women. So, the ADUN of Kota Lama has put forward that non-communicable diseases are, for me, diseases related to health within the body, lah. Non-communicable diseases, we get them from what we eat and drink. But among non-communicable diseases is mental, we put domestic violence under the mental category, lah.

We are also sorry to state, as Kota Lama has said, that 1,760 domestic violence cases were reported in Kelantan between 2020 and 2023; for 3 years, 1,700 were reported. In Malaysia there is the Domestic Violence Act, and among these acts, it is an act feared by men, there are pros and cons to it. It becomes easy for misunderstandings to occur between wife and husband. The wife may come home late, leave the house without asking permission; if according to Islam, it is nusyuz, lah. We can lightly smack, but we follow civil law, so even if a husband smacks his wife, if she makes a police report, the husband may be arrested tomorrow and put in the lock-up. Remand causes the husband to be put in the lock-up just for wanting to advise his wife; it may be true or may not be true, but we want to resolve household problems, so we settle with a rod, lah. The wife should report to the imam first, if we follow it; report to the imam first, pay 2 ringgit, how's that?

Yes... it relates to returning to religion. However, for comparison, I think we should compare this data with other states, lah, to see how serious the household issue in Kelantan is. Earlier I tried to do a study, 1,700 in Kelantan, see how many in Terengganu, how many in KL, how many in Johor, and we see the ranking trend that happens in Kelantan. According to Islam, there are several criteria for a husband to choose a wife. Yesterday the Honourable Dato' TMB read a hadith, and I remember, a wife is married for ﺢkahwini ﻷ ﻜ ﻨ ﺗ أَةُ ﺮ ﻤ ﻟ ﻊ ﺑ َرْ, because of four criteria ﺎkerana ﮭ ﺎﻟ ﻤ ﻟ, her wealth, her beauty, her lineage, because of ﺎkerana ﮭ ﺎﻟ ﻤ ﺠ ﻟ وَ ﺎkerana ﮭ ﺒ ﺴ ﺤ ﻟ وَ ﺎ ﮭ ﻨ ﯾ ﺪ ﻟ وَ her religion. In Shaa Allah, we choose a wife who is religious; such a wife will have a method to resolve husband-and-wife problems. If one chooses a wife who is less religious, when there is a problem with her husband, she does not talk to her husband; she talks to her sister.

So there is a problem with the husband... my husband yesterday said like this, to your sister, do not tell others, we are two people, if not, it will go viral and be heard by everyone. For me, the problem with a husband, the problem with a wife, is one of the problems. And for a wife to choose a husband, only one: a man who is pious. A pious man, if he loves you, he will honour you, he will praise you, he will uphold you, O woman. If the man is pious, he will not love you, and he will not betray you. That is one way of choosing a partner, and from there, the resolution of household problems begins. I think that is my answer for us to respond to the problem of domestic violence. We indeed intend to welcome all federal-level programmes held at the state level to protect the dignity of women, and Islam is certainly a religion which, in the Jahiliyyah era, lifted women from being underestimated to being elevated. Kelantan also has a women's exco, a women's leader, women's councils. Many men also get women's benefits, Al-Adalah Al-Musawah, In Shaa Allah. Thank you.

Deputy SpeakerEN

Before I continue, I would like to remind the Honourable Member that the supplementary question asked must be related to the original question. The question concerns non-communicable diseases and communicable diseases, so let us not raise questions that sound the same but are not the same. Please proceed, Bunut Payong.

Tuan Shaari bin Mat YamanPAS · PNBunut PayongEN

Thank you, Honourable Dato' Speaker. This question is related to disease. In the flood season... in the flood season, many are involved in floods, and we open temporary relief centres. However, I would like to know the extent of the State Government's preparedness to reduce the risk of waterborne diseases that may spread during this flood season.

Tuan Hilmi bin AbdullahPAS · PNGuchilEN

Yes, that is an appropriate question. The appropriate time is during the monsoon season. So I came here from Kuala Krai just now. There were two or three obstacles: first, the water rose at Tahfiz Pulai Chondong, stopped there, but we came with a 4x4; then at Kok Lanas the water blocked the road and entered the village paths. So there were blockages. And at state level we have a disaster management committee, and certainly in it there are representatives from the Health Department for public health to manage and also to set the procedures that must be complied with by all PPS (Temporary Relief Centre) operators, such as for food handlers. We, the Honourable Exco for Welfare, have applied from the beginning that all ADUNs be able to give the names of the operator staff, cooks, so that we can inject them, and also there is an SOP, and meanwhile, so that no communicable diseases occur; when it was Covid season, tents were separated. The current situation will be regulated by health personnel in each district. If there are problems, we will refer them to health personnel; if there are dialysis problems, they must be reported to the PPS head, that we need dialysis.

We will provide ambulances, we will prepare boats from the beginning; there are heart disease patients, we do not put them on the fourth floor, we put them downstairs. Those are among the basic solutions, lah. What we really care about is that every time there is displacement at any PPS, I believe all the staff appointed according to expertise, experience and knowledge already know how to act on the situations occurring at their respective PPS. Thank you.

Speaker

Silakan Tawang.

Tuan Harun bin IsmailPAS · PNTawangEN

Assalamualaikum warahmatullahi wabarakatuh. Honourable Dato' Speaker, I request to give the answer to my question number 6.

Question 6:

[Request YAB Ustaz Dato' Panglima Perang Menteri Besar to state what steps have been taken to face the monsoon season this year, especially in areas severely affected by floods?]

Puan Hjh. Rohani bin IbrahimPAS · PNTanjong MasEN

In the name of Allah, the Most Gracious, the Most Merciful.

Peace be upon you, and the mercy and blessings of Allah. Honourable Dato' Speaker, thank you to Honourable Tawang.

I would like to take this opportunity to answer the Bunut Payong question that was not answered on the second day. As we know, the latest news is that heavy rain has fallen in Kelantan and, in general, water levels have risen in areas at high risk of flooding. The latest... the latest developments regarding the PPS, which were opened until 9 o'clock this morning, are 40 temporary relocation centres covering 8 districts in Kelantan, involving 1,952 people from 602 families, and it has been reported that this number is increasing. Nevertheless, let us continue to pray that the affairs of the people of Kelantan will be made easier.

Honourable Dato' Speaker, Kelantan is synonymous with floods almost every year on a normal scale, but in the history of major floods in Kelantan, they were recorded in 1926, 1967, which was after 41 years, 2004, which was after 37 years, and 2014, after 10 years. This means it is not a 10-year cycle in succession. Let us pray that the history of 2014 will not repeat itself this year, insyaAllah.

Nevertheless, the Kelantan State Government takes seriously early, integrated preparedness across various agencies, based on the past experience of 2014. We have held several series of meetings with disaster-related agencies since September. To obtain the latest information on the level of preparedness for facing the northeast monsoon of 2024/2025, which is expected to occur from November to March 2025.

Among them, we held a meeting of the State Disaster Management Committee (JPBN) of Kelantan to coordinate preparations for facing this northeast monsoon. It was chaired by Dato' Kaya Setia, State Secretary of Kelantan. After receiving information regarding the northeast monsoon weather warning from the Malaysian Meteorological Department (MET Malaysia). The earliest measure taken was the mobilisation and appeal to mosques, surau, agencies and the people of Kelantan to hold solat hajat (prayers of need) to pray for safety and protection from flood disasters this year. I request that all parties strengthen the solat hajat at mosques and surau, and I ask that the imams remind all members of the congregation to take safety measures for themselves and their family members, especially the children. Always comply with the instructions of the authorities from time to time, and keep an eye on the children so that they do not play in places that are expected or considered dangerous to the safety of their lives, lah.

In terms of preparations for the temporary relocation centres (PPS), 459 temporary relocation centres have been identified with a total capacity of 186,440 people ready to be opened, compared with last year when only 214 PPS were opened, accommodating 46,618 people.

Every district was also asked to upgrade the active temporary relocation centres that have been identified as needing improvement. This work has been carried out at 38 PPS, and it is hoped that it has been completed, with a budget of 810,000 channelled by the National Disaster Management Agency (NADMA). In terms of food supply preparations, the Department of Social Welfare (JKM) has prepared a main storage depot for the needs of this flood at state level, 6 district disaster stores and 160 forward posts across the entire state. A total of 85 suppliers of disaster necessities have been appointed in all districts, which will be managed by the Food Committee at each PPS. In line with the state government's decision that all PPS will prepare cooked food through the method of gotong-royong (mutual cooperation), as mentioned by the exco PBT earlier. The JKM, assisted by penggawa and penghulu, has provided cooking staff for PPS across all of Kelantan, and we hope that this can be carried out in a very harmonious and best manner.

In terms of weather information preparedness, the Kelantan State Irrigation and Drainage Department (JPS) has prepared 108 telemetry stations for rainfall and water levels, 59 flood warning sirens, 107 current meters, 5 webcams, 137 mobile pumps, 1 agricultural dam and 4 water retention ponds. Once again, I want to stress to all residents in the surrounding areas at risk of flooding that they must always be alert to the flood warning sirens that are sounded, and not take lightly the warnings issued by the responsible authorities. Let us avoid letting our families play in places expected to be dangerous. As an urgent critical measure specifically for areas that are very much at risk of flooding, the worst being Rantau Panjang: the Pasir Mas JPS has expedited the construction of 20 outflow channel units for the Sungai Golok PLSB Project Phase 1, and the embankment that broke during the last northeast monsoon will not be repaired, in order to reduce the impact of flooding in the Rantau Panjang area. This has been detailed by Honourable Exco Infra in the previous round. A total of 618 locations have been listed as flood 'hot spots' for 204 across the entire State of Kelantan, identified by the Fire and Rescue Department (Bomba), and this is to increase the preparedness of the residents concerned and everyone for assistance. In terms of manpower and equipment, a total of 7,209 members or personnel, consisting of APM, Bomba, PDRM, RELA, ATM and 10 other agencies, will be mobilised together with 19,619 various assets compared with last year. A total of 7,147 members with only 17,147 assets. May it make our affairs easier.

The Department of Social Welfare (JKM) has also held a series of simulation exercises, namely in the districts of Tanah Merah and Pasir Puteh as skills training. We were also informed that an allocation of 550,000 from NADMA has been prepared for the operational costs of the operation controllers and for the food and drink of flood personnel and rescuers. The Kelantan State Fire and Rescue Department (Bomba) has also informed us that it has prepared a helicopter that will soon be stationed in the State of Kelantan, and a regional forward base will be based at the Wakaf Tapai Fire Academy, Terengganu, as a support group for the eastern region. The Kelantan State Civil Defence Force (APM) has also informed us that it has activated a disaster response support team, namely a support group for neighbouring states should they be affected by floods during this MPL period. At the level of the Kelantan State Disaster Welfare Committee, preparations were also carried out early, namely we held a coordination meeting with agencies, and we also held disaster preparedness training for volunteers for more than 100 volunteers from various backgrounds with NGOs.

A coordination and preparedness briefing on northeast monsoon welfare, attended by the disaster relief coordinating committees at the state constituency (DUN) level, penggawa, NGO bodies and the relevant agencies. A friendly Hi-Tea gathering with Welfare and Disaster NGOs, where we brought together more than 34 NGOs with various expertise, such as 4x4 vehicle teams, amateur radio teams and others who are active in helping during floods. We warmly welcome the support and encouragement of our NGO friends who are very enthusiastic in helping to provide welfare to flood victims.

Apart from that, we have run campaigns for the people, which we have carried out and are still carrying out, namely through electronic billboards and online poster advertisements, as well as the distribution of flyers and physical posters on tips for facing floods to all the people of the State of Kelantan.

Honourable Dato' Speaker, I take this opportunity this morning to convey my immense and boundless gratitude to all parties who have given their best commitment, directly and indirectly, in the state's preparedness efforts to face any possibility of this disaster.

The very good cooperation of the rescue agencies in helping to train and prepare volunteers from various individual NGOs is also very much appreciated. Finally, let us pray

that the affairs of the flood in the State of Kelantan will be made easier, and that blessings be granted to all the people of Kelantan, insyaAllah.

Sekian.

Peace be upon you, and the mercy and blessings of Allah.

SpeakerEN

Tawang, supplementary question?

Tuan Harun bin IsmailPAS · PNTawangEN

Thank you, Honourable Dato' Speaker, and thank you to Honourable Dato' Exco. Alhamdulillah, it seems the preparations are very detailed and extensive, as mentioned by the State Government. However, is there any other form of preparation there, namely preparation in the spiritual form? Spiritual food to prevent stress and so on for the victims staying at the temporary relocation centres (PPS), thank you.

Puan Hjh. Rohani bin IbrahimPAS · PNTanjong MasEN

Thank you for asking. Rohani is answering today. Honourable Dato' Speaker, as is known to all, the State of Kelantan, under the temporary relocation committee, has 2 additional committees, namely the activities committee and the worship committee. At the PPS, the activities committee has the role of organising programmes for flood victims at the PPS so that they do not feel stressed, and at the same time they will have their time filled with activities arranged by friendly NGOs under the supervision of the Kelantan State Government, as well as other NGOs who also assist JKM.

Among the activities carried out are children's activities, tazkirah, congregational prayers, gotong-royong and other activities according to suitability at the PPS. On this occasion, a total of 194 counsellors will be ready to serve as the psychology support team (PST) at the PPS to help flood victims who need assistance. Thank you.

SpeakerEN

Please, Wakaf Bharu.

Tuan Mohd Rusli AbdullahPAS · PNWakaf BharuEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Honourable Dato' Speaker. Last night there was heavy rain, and Wakaf Bharu was among those affected by or struck by floods in Wakaf Bharu, and this morning at 9:30, 1 PPS was opened, with victims numbering around 110 people from 20 families. Supplementary question: how will the government ensure that the PPS and the equipment are adequate to accommodate flood victims? Thank you.

Puan Hjh. Rohani bin IbrahimPAS · PNTanjong MasEN

Thank you to Honourable Wakaf Bharu. In terms of the equipment and necessities at the PPS, insyaAllah, if no extraordinary disaster occurs, insyaAllah those necessities are sufficient, but they must register at the PPS, insyaAllah, and we will provide the appropriate assistance. Thank you.

Peace be upon you, and the mercy and blessings of Allah.

SpeakerEN

The Honourable Semerak is invited.

Tuan Norsham bin SulaimanPAS · PNSemerakEN

Thank you, Dato' Speaker. My question number 7 is also an answer. Question 7: [ Request that YAB Ustaz Dato' Panglima Perang Menteri Besar state the current status of the development of the Bukit Merbau Sports Complex? ]

Tuan Zamakhshari bin MuhamadPAS · PNApam PutraEN

In the name of Allah, the Most Gracious, the Most Merciful.

Peace be upon you, and the mercy and blessings of Allah. Dato' Speaker, thank you to Semerak for the question regarding the current status of the development of the Bukit Merbau sports complex. The development of Madinah Ar-Riadhah Bukit Merbau, or better known as the Bukit Merbau Sports Complex, is a joint development collaboration between the State Government and the Federal Government in developing national-standard sports facilities for the purpose of hosting the Sukma Kelantan 2028 games and subsequently cultivating a healthy lifestyle for the people of this state with more perfect facilities, as stated in the presentation or answer earlier by the Health Exco, meaning to reduce obesity. We encourage a healthy lifestyle for the people of Kelantan, insyaAllah.

At present, earthworks at the site are being actively carried out, with almost the entire sports venue development site having been completed for handover to the Malaysian Public Works Department (JKR) for the construction of the main venues, including the main stadium site, the complex and squash courts, and the padang bowling arena. The current percentage of progress for earthworks is 70.9% compared with the actual schedule that should be 79%, meaning it is behind by about 8%, with a delay of 45 days. Earthworks for the construction of the main road are also being actively carried out, with a total length of 2.854 kilometres, and the physical progress status is 51% for the main road, its completion is 51%. The main factor for the delay is the blasting of very large and complicated boulders for the foundation, which was beyond the original expectation. The contract for the earthworks of this development is under the state government's allocation, with a contract worth RM62 million.

At the same time, infrastructure and utility development works for Madinah Ar-Riadhah are being carried out. Earlier it was earthworks, now it is infrastructure and utility works. One important aspect of this project is the installation of the main pipes, which has begun, with the actual physical progress percentage for utilities at 31% and it is on schedule as set. The installation of this water reticulation system covers as far as 2 kilometres along the main access road. In addition, the construction of the pump house and suction tank has also begun, achieving a physical progress of 14.92%. This active infrastructure construction is carried out to ensure an adequate water supply and an efficient utility system for this sports complex.

The contract for this infrastructure development is also under the state government's allocation, with a current contract value set at RM53 million. Meanwhile, the main contractor for the main stadium has entered the site. This means that although the earthworks are not yet fully completed, they have many components. So the components for the main stadium can now be entered and initial works such as the construction of the site for the main stadium are currently being carried out. Sorry. The construction of the site office or 'sight office' for the main stadium has been carried out. At the same time, basic site works such as pile testing or 'testing pile' are also being carried out to ensure the stability and safety of the structure to be built. Meanwhile, for the construction of the indoor arena, the expected SST is 9 December. This means next month, insyaAllah, there will be an SST for the indoor stadium. The shooting range SST is on 28 October 2024. The hockey complex expected SST is 25 July 2025. These projects are at the procurement process stage at the Malaysian Public Works Department (JKR), which shows positive progress in efforts to develop sports facilities.

For the construction of the squash centre, the expected SST is 15 August 2025, and the padang bowling arena expected SST is 15 August 2025. These projects are generally still at the documentation preparation stage before they can be brought to the procurement process, marking continuous steps in ensuring that all facilities can be provided in line with the allocations that have been approved in Rolling Plan 2 of RMK12, insyaAllah. All these plans have been coordinated by the state government and JKR Malaysia to ensure that all Sukma Kelantan venues can be completed by the end of 2027. Thank you.

SpeakerEN

Please, supplementary question, Semerak.

Tuan Norsham bin SulaimanPAS · PNSemerakEN

Thank you, Dato' Speaker. When is the Bukit Merbau Complex expected to be fully completed? And what other facilities are there in this Complex? Thank you.

Tuan Zamakhshari bin MuhamadPAS · PNApam PutraEN

Ok, thank you, Semerak, for the supplementary question. Overall, the development of the Bukit Merbau Sports Complex, as mentioned earlier, is progressing smoothly, with some delay due to several factors mentioned earlier, where in terms of planning it is expected that the entire development will be fully completed by August 2027. Where the final deadline based on the planning for the whole construction of sports infrastructure will be completed by August 2027, before Sukma Kelantan 2028. Meanwhile, the main venues, there, or I will mention here the overall masterplan of the Bukit Merbau Sports Complex, it has 12 items including facilities. The first is the Bukit Merbau Main Stadium, which is already in the construction phase. The second is the Hockey Stadium, which is in the procurement process. The third is the multipurpose indoor arena, which is in the procurement process. The fourth is the shooting range, which is in the procurement process. The fifth is the Squash Complex, which is in document preparation. The sixth is the Longball Court, which is in document preparation.

The seventh is the construction or padang of the Rugby Field, which is in document preparation.

The eighth is the synthetic football field, which has not yet started.

And the other components are the Bukit Merbau Mosque, a Sports School, mixed development meaning residences and so on. And the last one is the Entrepreneurs' Market or Food Court. Those are among the components involved in the development of the Bukit Merbau Sports Complex. Thank you.

SpeakerEN

Honourable Members all, I intend to adjourn the House this morning. The House will resume at 11:00 am.

THE HOUSE IS ADJOURNED AT 10.30 AM AND WILL RESUME AT 11.00 AM

(Business of the House After Recess)

SpeakerEN

THE HOUSE RESUMED AT 11.00 AM

SpeakerEN

The House is resumed.

SecretaryEN

[ Sixth Bill ] Sixth Bill.. YAB DATO' PANGLIMA PERANG USTAZ DATO' MENTERI BESAR will propose the Bill (Allowances and Privileges) Majlis Perajaan dan Majlis Penasihat Raja 1964. BILL (ALLOWANCES AND PRIVILEGES) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. =========================================

[ FIRST READING ]

Honourable Dato' Speaker, I respectfully move a Bill entitled: AN ENACTMENT TO AMEND THE (ALLOWANCES AND PRIVILEGES) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. Let it be read for the First Time.

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members all, the Bill is to be read for the First Time.

SecretaryEN

AN ENACTMENT TO AMEND THE (ALLOWANCES AND PRIVILEGES) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. [ Standing Orders 122 ]

Honourable Dato' Speaker, I respectfully move that Standing Rules and Orders 122 be applied for the purpose of enabling me to proceed with this Bill at all stages in this Meeting today.

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the question before us now is a motion that Standing Rules and Orders 122 be applied for the purpose of enabling this Bill to be proceeded with at all stages in today's sitting of the House. Accordingly, I put this motion to the vote. HONOURABLE MEMBERS WHO AGREE, SAY "AGREE"; HONOURABLE MEMBERS WHO DISAGREE, SAY "DISAGREE". Agreed. [ SECOND READING ]

Honourable Dato' Speaker, I respectfully wish to inform the House that I will move the Second Reading of this Bill in today's sitting of the House.

Honourable Dato' Speaker, I respectfully move that a Bill entitled –

SUATU ENAKMEN UNTUK MEMINDA UNDANG-UNDANG (ELAUN DAN KEUTAMAAN) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964.

be read a Second Time.

ﻟﺮﺣﻴﻢ ا ﻟﺮﲪﻦ ا ﷲ ﺑﺴﻢ

ﻟﻪ أ ﻋﻠﻰ و ﳌﺮﺳﻠﲔ, وا ء ﻷﻧﺒﻴﺎ ا ف ﺷﺮ ا ﻋﻠﻰ م ﻟﺴﻼ وا ة ﻟﺼﻼ وا ﻟﻌﺎﳌﲔ, ا رب ﻪﻠﻟ ﳊﻤﺪ ا

ﲨﻌﲔ أ ﺻﺤﺒﻪ و

ِ ِ ِ ِ ِ ِ ِ ﺎ ﻤ ﻛ ﻷ ٱ ﰱ ﻢ ﱠﻬ ـ ﻨ ﻔ ﻠ ﺨ ﺘ ﺴ ﻴ َ ﻟ ﺖ ﺤ ﻠ ـٰ ﻟﺼﱠ ٱ ا۟ ﻮ ُ ﻠ ﻤ ﻋ ﻢ ﻨﻜ ُ ﻣ ا۟ ﻮ ﻨ ﻣ ﻳﻦ ﻟﱠﺬ ٱ ﻪﻠﻟﱠ ٱ ﺪ ﻋ َ َ َ ُ َ َ َْرْضِ ْ ُ ْ ْ َ َـٰ َ وَ ْ َ ءَا َ ُ َ وَ ِ ِ ِ ِ ِ ﺪ ﻌ ﺑ ﻦ ﻣ ﻢ ﱠﻬ ـ ﻨ ﻟ ﺪ ﺒ ﻴ ﻟ ﻢ ﳍ ﻰ ﻀ ﺗ ِى ﻟﱠﺬ ٱ ﻢ ﻬ ﻳﻨ دِ ﻢ ﳍ ﻨ ﻜ ِّ ﻤ ﻴ ﻟ ﻢ ﻬ ﻠ ﺒ ﻗ ﻦ ﻣ ﻳﻦ ﻟﱠﺬ ٱ ﻒ ﻠ ﺨ ﺘ ﺳ ْ ـَ ِّ ُ َ ِّ َ ـُ َ َُ ٰ َ َ ٱرْ ُ ـَ َُ ﻦﱠ َٱ ُ َ ْ ـَ َ َ ْ َ ْ وَ ْ ُ ْ َ وَ ْ َ ِ ِ ِ ِ ﻢ ﻫ ﻚ ﺌ َـٰٓ ﻟ ُو۟ ﺄ ﻓ ﻚ ﻟ ﺪ ﻌ ﺑ ﺮ ﻔ ﻛ ﻦ ﻣ ﺎ ﻴ ﺷ ﰉ ِ ﻮ ﻛ ﺮ ِ ﺸ ﻳ ﻻ َ ﲎ ِ ﻧ ﺪ ﺒ ﻌ ﻳ ﺎ ﻨ ﻣ أَ ﻢ ﻬ ﻓ ﻮ ﺧ َ َ َ ذَٰ َ َ َ َ نَ ُ ْ َ ُو ًۭ ُ ُ ْ ـَ َ َ وَ ْـًۭٔ ُ ُ ْ ـَ ْ ْ ْ َ ِ ٥٥ ن ﻮ ﻘ ﺴ ﻔ ﻟ َٱ ُ َـٰ ْ

Its meaning: Allah promises those among you who believe and do righteous deeds, O followers of the Prophet Muhammad S.A.W., that He will make them successors upon the earth, just as He made successors of those before them who held power, and that He will establish for them their religion, which is Islam, which He has approved for them. And He will replace their fear with security after they have suffered fear from the threat of enemies. They shall continue to worship Me and not associate anything with Me. And whoever disbelieves after that, they are the defiantly disobedient.

Surah An-Nur, verse 55

Honourable Dato' Speaker,

I respectfully wish to inform the House that I move the Second Reading of the Bill entitled Rang Undang-Undang (Elaun dan Keutamaan) Majlis Perajaan dan Majlis Penasihat Raja Pindaan 2024 in today's sitting of the House.

Honourable Dato' Speaker,

I respectfully move a Bill entitled Rang Undang-Undang (Elaun Dan Keutamaan) Majlis Perajaan Dan Majlis Penasihat Raja Pindaan 2024 for the purpose of amending section 3 and section 5 of the Undang-Undang dan Elaun Dan Keutamaan) Majlis Perajaan Dan Majlis Penasihat Raja 1964.

Honourable Dato' Speaker,

I respectfully move to read the clauses contained in the Rang Undang-Undang (Elaun dan Keutamaan) Majlis Perajaan dan Majlis Penasihat Raja Pindaan 2024, this Enactment.

For the information of Honourable Dato' Speaker and Honourable Members, this Enactment contains 3 clauses, namely clause 1 contains the short title and the commencement date of the proposed Enactment. Clause 2 seeks to amend section 3 by substituting a new subsection 1 to insert the allowances in the schedule to the Principal Enactment and deleting subsection 2.

Clause 3 seeks to substitute section 5 with a new section. Finally, the Kelantan State Government hopes that this Rang Undang-Undang Elaun and Keutamaan Majlis Perajaan dan Majlis Penasihat Raja Pindaan 2024 will receive the full support of Honourable Members.

Honourable Dato' Speaker, I respectfully move.

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the question before us now is a Bill entitled Suatu Enakmen untuk meminda Enakmen (Elaun dan Keutamaan) Majlis Perajaan Dan Majlis Penasihat Raja 1964. I now put this Bill forward for debate. Is there any debate? Ok, there is no debate, and no reply. Honourable Members, the question before us now is a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA UNDANG-UNDANG (ELAUN DAN KEUTAMAAN) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. be read a Second Time.

SecretaryEN

SUATU ENAKMEN UNTUK MEMINDA UNDANG-UNDANG (ELAUN DAN KEUTAMAAN) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. [ COMMITTEE STAGE ]

SpeakerEN

The House now sits as a Committee. [ MACE LOWERED ]

Secretary

Fasal 2

SpeakerEN

Clause 2 stands part of the Bill.

Secretary

Fasal 3.

SpeakerEN

Clause 3 stands part of the Bill.

SecretaryEN

Clause 1 and the Enacting Formula.

SpeakerEN

Clause 1 and the Enacting Formula stand part of the Bill. The sitting of the House resumes. [ MACE RAISED ] [ THIRD READING ]

Honourable Dato' Speaker, I respectfully wish to inform the House that a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA UNDANG-UNDANG (ELAUN DAN KEUTAMAAN) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. has been considered in the Committee Stage clause by clause and has been agreed to without amendment. Accordingly, Honourable Dato' Speaker, I respectfully move that a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA UNDANG-UNDANG (ELAUN DAN KEUTAMAAN) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. be read a Third Time and passed now.

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the question before us now is a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA UNDANG-UNDANG (ELAUN DAN KEUTAMAAN) MAJLIS PERAJAAN DAN MAJLIS PENASIHAT RAJA 1964. be read a Third Time and passed now. HONOURABLE MEMBERS WHO AGREE, SAY "AGREE"; HONOURABLE MEMBERS WHO DISAGREE, SAY "DISAGREE". Agreed, that the said Bill be read a Third Time and passed now. This Enactment may be cited as the Undang-Undang (Elaun dan Keutamaan) Majlis Perajaan dan Majlis Penasihat Raja (Pindaan) 2024. This Enactment shall come into operation on 1 January 2025. The Sixth Bill is received and passed. ENACTED BY THE LEGISLATIVE ASSEMBLY OF THE STATE OF KELANTAN. [ Seventh Bill ]

SecretaryEN

Seventh Bill: YB Dato' Deputy Menteri Besar will move the Rang Undang-Undang Perhutanan Negara (Pemakaian) (Pindaan (No.3) 2024. RANG UNDANG-UNDANG PERHUTANAN NEGARA (PEMAKAIAN) (PINDAAN (NO.3) 2024. =========================================

[ FIRST READING ]

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully move that a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985. be read a First Time.

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the said Bill is to be read a First Time.

SecretaryEN

SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985. [ STANDING RULES AND ORDERS 122 ]

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully move that Standing Rules and Orders 122 be applied for the purpose of enabling me to proceed with this Bill at all stages in this sitting today.

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the question before us now is a motion that Standing Rules and Orders 122 be applied for the purpose of enabling this Bill to be proceeded with at all stages in today's sitting of the House. Accordingly, I put this motion to the vote. HONOURABLE MEMBERS WHO AGREE, SAY "AGREE"; HONOURABLE MEMBERS WHO DISAGREE, SAY "DISAGREE". Agreed. [ SECOND READING ]

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully wish to inform the House that I will move the Second Reading of this Bill in today's sitting of the House. Honourable Dato' Speaker, I respectfully move that a Bill entitled –

SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985.

be read a Second Time.

ﺑﺮﻛﺎﺗﻪ و ﷲ ﲪﺔ ور ﻋﻠﻴﻜﻢ م ﻟﺴﻼ ا Honourable Dato' Speaker,

I respectfully wish to inform the House that I will read the Second Reading of the Enactment of the Rang Undang-Undang Perhutanan Negara (Pemakaian) (Pindaan No.3) 2024 in today's sitting of the House.

Honourable Dato' Speaker,

The State Executive Council, on 1 November 2023, decided to study the need to amend the Enakmen Perhutanan Negara (Pemakaian) 1985. This amendment aims to regulate carbon activities in the State of Kelantan, as forest carbon activities have the potential to become a new source of revenue for the State Government in the future, while also encouraging the protection and conservation of forests in this state.

The proposed amendment to this Bill has been refined and endorsed by the Forestry Sub-Committee (JKKP) No. 2/2024 for submission for the consideration of the State Executive Council.

Furthermore, the State Executive Council, which sat on 2 October, decided to agree that this Bill be submitted to the State Legislative Assembly sitting on this occasion.

Honourable Dato' Speaker,

This Bill involves only amendments to 2 provisions in the Enakmen Perhutanan Negara (Pemakaian) 1985, namely to define carbon stock and greenhouse gases in any forest in this state as a State Authority, so that it may make regulations concerning the regulation of forest carbon activities and matters related thereto.

Honourable Dato' Speaker,

I respectfully wish to read the clauses contained in the Rang Undang-Undang Enakmen Perhutanan Negara (Pemakaian) (Pindaan No.3) 2024 "this Enactment". For the information of Dato' Speaker and Honourable Members, this Enactment contains 3 clauses, namely:

Clause 1 contains the short title and the commencement date of the proposed Enactment.

Clause 2 seeks to amend Section 2 of the Principal Enactment by inserting paragraph (d) concerning carbon stock and greenhouse gases in any forest within the definition of "Forest Produce".

Clause 3 seeks to amend subsection 111 (2) of the Principal Enactment by inserting paragraph (x), which provides the legal authority for the State Authority to make regulations concerning the regulation of forest carbon activities and matters related thereto.

Honourable Dato' Speaker and Honourable Members,

The Kelantan State Government records its thanks to all parties directly and indirectly involved in drafting this Rang Undang-Undang Enakmen Perhutanan Negara (Pemakaian) (Pindaan No.3) 2024.

Finally, the Kelantan State Government hopes that this Rang Undang-Undang Perhutanan Negara (Pemakaian) (Pindaan No.3) 2024 will receive the full support of Honourable Members in order to strengthen the administration and management of forests in the State of Kelantan.

I respectfully move.

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the question before us now is a Bill entitled Suatu Enakmen untuk meminda Enakmen Perhutanan Negara (Pemakaian) 1985. I now put this Bill forward for debate. There is no debate, and no reply.

SpeakerEN

Honourable Members, the question before us now is a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA PERHUTANAN NEGARA (PEMAKAIAN) 1985. be read a Second Time.

SecretaryEN

SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985. [ COMMITTEE STAGE ]

SpeakerEN

The House now sits as a Committee. [ MACE LOWERED ]

Secretary

Fasal 2

SpeakerEN

Clause 2 stands part of the Bill.

Secretary

Fasal 3

SpeakerEN

Clause 3 stands part of the Bill.

SecretaryEN

Clause 1 and the Enacting Formula.

SpeakerEN

Clause 1 and the Enacting Formula stand part of the Bill. The sitting of the House resumes. [ MACE RAISED ] [ THIRD READING ]

Dato' Dr. Hj Mohamed Fadzli b Dato' Hj HassanPAS · PNDeputy Menteri Besar · TemanganEN

Honourable Dato' Speaker, I respectfully wish to inform the House that a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985. has been considered in the Committee Stage clause by clause and has been agreed to without amendment. Accordingly, Honourable Dato' Speaker, I respectfully move that a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985. be read a Third Time and passed now.

Honourable Dato' Speaker, I respectfully second the motion.

SpeakerEN

Honourable Members, the question before us now is a Bill entitled – SUATU ENAKMEN UNTUK MEMINDA ENAKMEN PERHUTANAN NEGARA (PEMAKAIAN) 1985. be read a Third Time and passed now. HONOURABLE MEMBERS WHO AGREE, SAY "AGREE"; HONOURABLE MEMBERS WHO DISAGREE, SAY "DISAGREE". Agreed, that the said Bill be read a Third Time and passed now.

SecretaryEN

This Enactment may be cited as the Enakmen Perhutanan Negara (Pemakaian) (Pindaan No.3) 2024. This Enactment shall come into operation on the date it is published in the Gazette. The Seventh Bill is received and passed. ENACTED BY THE LEGISLATIVE ASSEMBLY OF THE STATE OF KELANTAN.

SpeakerEN

Alhamdulillah, we have tabled, debated and passed 7 Bills, and I thank all parties involved in the debates and in discussing the motions that have been put forward. Honourable Members, I wish to adjourn the sitting, invoking Article 9 of the Standing Rules and Orders of the Kelantan State Legislative Assembly. I adjourn this sitting until a date to be announced later. The sitting is adjourned with the recitation of Tasbih Kafarah and Surah Al-Asr.

THE HOUSE IS ADJOURNED AT 11.30 A.M. AND WILL RESUME ON A DATE TO BE ANNOUNCED LATER.