Negeri Sembilan · 1 December 2021
14th Assembly, 4th session, 2nd meeting (Budget) · 637 turns · 42,101 words · official PDF ↗ · Digital Hansard ↗
ExperimentalNegeri Sembilan publishes one PDF per meeting, naming speakers by seat. The 15th Assembly was dissolved on 5 Jun 2026; the 16th (elected 1 Aug 2026) has published nothing yet. Written answers are not published.
Recitation of Prayer
Order of proceedings, item one, Recitation of Prayer. The Honourable State Assemblyman for Lenggeng is invited to proceed.
[The Honourable ADUN for Lenggeng recited the prayer under Standing Order 9 of the Standing Orders of the State Legislative Assembly]
Message from the Speaker of the House
Item two, Message from the Honourable Dato' Yang Dipertua Dewan.
Bismillahhirrahmanirrahim, assalamualaikum WBT, peace be upon you. Alhamdulillahirrabbil'alamin, wassatulawassalamu'ala asyrafil ambiya iwalmursalin, wa'ala alihi wasahbihi ajmain. Roditubillahirobba, wabil islamidina, wabimuhammaddin nabiya warosula. Allahuma'afini fibadani, allahuma'afini fisam'i, allahuma'afini fibashari.
All praise is due to Allah, Lord of the Worlds. Blessings and peace be upon the noble Prophet Muhammad SAW, his family and his companions. The Most Honourable Dato' Seri Haji Aminuddin bin Haji Harun, Menteri Besar of Negeri Sembilan; the Honourable Members of the State Executive Council; the honourable Members; heads of departments; Dato'-Dato', Datin-Datin; gentlemen and ladies, all honoured guests. Alhamdulillah, today is the fourth day of our sitting, namely 1 December 2021, for the Fourth Session of the 14th Negeri Sembilan State Legislative Assembly, which is resumed.
I call upon all the Honourable Members to always abide by the Standing Orders, the Standing Orders of the House, the conduct and ethics expected of Honourable Members throughout the sitting. I would also like to remind all guests to always comply with the SOPs that have been set. That is all, thank you, wabillahitaufik walhidayah, assalamualaikum WBT.
Questions — Questions Requiring Oral Answers (Fourth Day)Questions
Item three, Questions. Questions Requiring Oral Answers (Fourth Day).
Honourable Members, as usual, we begin with oral questions until 11:30 a.m. And today we begin with the question from Seremban Jaya.
Thank you, Dato' Yang Dipertua. Dato' Yang Dipertua, I am submitting my second question.
Dato' Yang Dipertua, thank you for the question from the State Assemblyman for Seremban Jaya concerning the tourism sector in Negeri Sembilan. Dato' Yang Dipertua, data on tourist arrivals from Tourism Malaysia shows that the number of tourist arrivals in Negeri Sembilan for the period January – June 2021 was on average 17,000 persons a month, yes. This was during the COVID-19 pandemic. And on average, yes, this is an average.
And when we moved to Phase 3 of the National Recovery Plan on 4 September 2021, which allowed some tourism sectors to operate, such as hotel operations, tourist attractions, MICE activities and dine-in facilities, the number of tourists to Negeri Sembilan increased by up to 90%, or on average 32,000 persons a month. This was when only interstate travel was not permitted.
And alhamdulillah, at that time we also saw that the domestic tourism sector in Negeri Sembilan was quite encouraging, and we saw that some places were, were too full. For example, Port Dickson, Ulu Bendul and several other places. And when we entered Phase 4 and interstate travel was allowed, we saw at that time, yes, and I was informed that until March, until February this year, room bookings in Port Dickson have been full, and this is a, a very encouraging thing. And we hope that if interstate travel is allowed, this will also increase the number of tourists from abroad coming to our country, our state. Not only that, they also, ha, come today to our eco-tourism places, which have also been filled.
Besides that, we also see how cyclists from outside, motorcyclists, car users, drivers. Besides that, they stop at shops or restaurants, our smoked-fish stalls, which are famous for smoked fish and duck, smoked duck along the Kuala Pilah road. And we are well aware that the Kuala Pilah road gets jammed every week, yes. So this shows us that the domestic tourism sector of our country, visitors coming to Negeri Sembilan, is very encouraging. And insyaAllah next week, in two weeks' time, we will hold the Bola Ngoca Festival, yes, at Ngoca Stadium in Seri Menanti. Thank you, Dato' Yang Dipertua.
Dato’.
Thank you ….
Dato' Yang Dipertua …..
Oh, is there a supplementary question?
Supplementary question. What types of tourist destinations have been the main focus since the Movement Control Order (PKP) for COVID-19? Thank you, Dato' Yang Dipertua.
We are well aware that after interstate travel was allowed, yes, the main focus of tourists has been the beaches, the Port Dickson beach resort, our mountains; Gunung Datuk, Gunung Angsi. We also have attractive places, our eco-tourism areas such as Kenaboi, which have become the main focus, visitors to Ulu Bendul, Jeram Toi, and we also should not forget that they like to climb hills early in the morning, yes. Such as Bukit Temiang, what's it called, Melati, Bukit Taisho and several other hills that are now the focus. And we also see that many places have been made viral by the public who are fond of certain areas. And alhamdulillah, this gives a good promotion to the State Government in the tourism sector, to see this tourism sector recover, yes. And alhamdulillah this is what we see every, especially on weekends; Saturday – Sunday, Friday, Saturday, Sunday, very large crowds at our eco-tourism areas. Not only at our beaches, which we are well aware of. Thank you, Dato' Yang Dipertua.
Thank you, Honourable Sikamat. I now invite the Honourable Seri Menanti.
Thank you, Dato' Yang Dipertua, I am submitting the first question.
Dato' Yang Dipertua, thank you to Seri Menanti for asking the question about Small and Medium Industries, especially along the route from Tanjung Ipoh to Ulu Bendul.
Dato' Yang Dipertua, the Kuala Pilah District Council has provided 18 open stall units on the Ulu Bendul – Kuala Pilah road to improve the economy of the community, especially residents in rural areas. In addition, the Kuala Pilah District Council is now taking action to refurbish the Ulu Bendul R&R building for rental to local SMEs. The Kuala Pilah District Council also plans to use the parking lot next to the Ulu Bendul R&R building to create a commercial space for SME entrepreneurs in the Kuala Pilah District.
In terms of assistance, both State Government agencies and the Federal Government have worked on many forms of assistance to help SME traders, small and medium traders. Among them, under the State Government, as we know, we have TUNS and TUNS Plus. Under Federal Government agencies, there are various, including SME Corp.
SME Corp. plays a role in helping to develop the capacity of Small and Medium Enterprises by providing support programmes in the form of SME Capacity Assessment to identify the level of business achievement, advisory services, organising course activities, webinars and pocket talks, as well as providing financial assistance in the form of Matching Grants to SMEs that have potential and are eligible, to ensure entrepreneurs are able to compete with other companies.
The Bumiputera Capacity Enhancement Programme, known as BEEP, has greatly helped improve the capacity of SMEs in the manufacturing and services sectors so that they have greater potential to market their products and services throughout Malaysia. The assistance packages provided under this programme include:
Certification and Quality Management Systems;
Improvement of Product Packaging; Product Development and Innovation; Productivity and Automation; Branding and Promotion Development; Online Applications, e-Commerce, e-Payment and ICT Applications.
However, SMEs must comply with the set conditions and criteria, mainly they must operate at lawful premises and hold a licence from the Local Authority (PBT), and must have been carrying on business for at least 6 months, in addition to being registered with the Companies Commission of Malaysia (SSM).
To date, SME Corp. Malaysia has disbursed Matching Grants under the BEEP Programme to 216 SMEs, with a total approved assistance amount of 26.2 million ringgit to SMEs in Negeri Sembilan as a whole.
Under the Bumiputera Young Entrepreneur Seedling Programme (TUBE), SME Corp. has trained a total of 204 young entrepreneurs aged 18 – 30, which is a government initiative to encourage the younger generation to venture into business since 2014. The main objectives of the Bumiputera Young Entrepreneur Seedling Programme are to:
cultivate and plant an entrepreneurial spirit among young people;
shift the paradigm of young people from job seekers to owners or operators of businesses; and
build resilience and identity among young people in running their own businesses.
Thank you, Dato' Yang Dipertua.
Dato' Yang Dipertua, supplementary question. Actually there are many, yes, traders along the Terachi route just now who need help. Thank you for the explanation from, what's this, EXCO from Ampangan. And actually many more do not have information, yes, regarding the facilities they can obtain, yes. Especially in packaging, or in terms of the quality of goods and so on. That is why my question, yes, is what action are we, what is our action to upgrade or develop, what's this, traders in the area? I mean, the point is their goods, their products, can be distributed not only domestically, yes, but also, yes, overseas. So if there is action just now in terms of quality and so on, then I hope we can go much further. And what is our role, the State Government, yes, in helping these people, yes, so that they can go much further in their markets? If we look at the markets abroad, right, most of them are from our neighbouring countries, yes, none from our own country. So that is why, if possible, we can, what's this, help them so that they can penetrate overseas markets. At the very least, even if we go to Mecca, Dato' Yang Dipertua, we can find, yes, our products, our local products. And, my question just now, yes, what is our role, the State Government, in helping these people? Thank you.
Thank you, Honourable Seri Menanti. We are indeed making efforts to help our entrepreneurs expand their businesses and also to widen the marketing of their products, whether domestically or overseas, yes. The main problem faced by our entrepreneurs is first in terms of certification. For example, for those of us involved in F&B (Food and Beverages), we need to ensure there is certain certification, for example HALAL, HACCP, yes, MUST, which is important to ensure our products can be marketed more widely.
SME Corp. and, and also MARA, are among the agencies that help a lot. SME Corp. has been entrusted, together with the Chief Executive Officer of SME Corp., to assess entrepreneurs who are eligible in Negeri Sembilan for us to help. And the process is ongoing. And for entrepreneurs in this area, we strongly encourage them to meet either the State Government directly or SME Corp. so that we can see how to help them. And as long as they fulfil the first conditions I mentioned, they have premises that have been set, yes. Because we want to ensure all these traders have suitable premises, yes. Therefore a Local Authority (PBT) licence is very important and is a prerequisite for them to apply for these assistances, yes.
Second, they must also be registered with SSM, yes. This is also important, yes. And we also want to see that these traders have been operating for at least 6 months so that we can give an assessment. So insyaAllah I am very confident that with these assistances, they will be able to help them expand and widen their businesses. And if there are any problems, we very much welcome, yes, to work together with them so that we can guide them, to ensure that they can succeed, insyaAllah. Thank you, Dato' Yang Dipertua.
Thank you, Honourable Seri Menanti, thank you, Honourable Ampangan. Next, we go to question 3, Mambau.
Thank you, Dato' Yang Dipertua, Mambau submits the first question.
Thank you, Dato' Yang Dipertua, thank you for the question from the Honourable Mambau concerning abandoned housing projects and housing estates in the Mambau State Constituency. For the information of the Honourable Mambau, based on the records of the Seremban City Council, so far there is no list of abandoned projects within the Mambau State Constituency. Only, for the information of the Honourable Mambau, in the Mambau area there is one flat, Desa Rasah flat, which has the status of premises unsafe for occupation. That is all.
Dato' Yang Dipertua, supplementary question. So, Dato' Yang Dipertua, there is indeed a site of a hostel flat building that is abandoned, overgrown with weeds, at a location next to the Kampung Baru Mambau Village Clinic. The hostel flat, which, about 80 units there, has been left vacant and overgrown. I request that the parties involved provide a, provide a written answer on the latest status regarding the complaints that have gone on for decades there. Thank you, Dato' Yang Dipertua.
Thank you for the supplementary question from the Honourable Mambau. Thank you for the information given. And after this, I request that MBS or the Housing Division carry out an investigation, we need to see who is the owner of the building. For the information of the Honourable Mambau and also all the Honourable Members, actually over the 3 years when Pakatan Harapan led the Negeri Sembilan State Government, the State Government had already made many efforts to revive abandoned projects. One of the best examples is the abandoned project in Kuala Pilah. It had dragged on for about 30 years. And the State Government had succeeded in obtaining a solution, yes, obtaining a solution to help those who were wronged by the earlier developers. That is one of the efforts we have made.
Similarly with what the Honourable Mambau mentioned just now. If the flat has owners, or the flat has buyers, I think perhaps the Honourable Mambau can help the government to obtain details of the buyers and we will try our utmost to help. Because I see at this time there are indeed many companies or many parties, from the private sector, who have the intention to help the government to resolve abandoned projects. I think in this matter, I would also like to inform the Honourable Members, if there are any issues of houses, shops or any abandoned projects in their respective areas, please inform me. And we will try our utmost to help resolve abandoned projects, because we are well aware that most of these buyers are still paying bank loans, but until today they still cannot own their homes. So, that is a little from me. Thank you.
Thank you, Honourable Mambau, Honourable Bahau. The next question, Honourable Chembong.
Honourable Dato' Yang Dipertua, I submit the first question.
Dato' Yang Dipertua, question, thank you to the Honourable State Assemblyman for Chembong for the question concerning Religious and Fardu Ain Classes (KAFA).
Dato' Yang Dipertua, so far there are 310 KAFA classes that have been conducted in 7 institutions, namely 201 in national schools, 9 in Chinese National-Type Schools, 1 in a secondary national school, 56 in People's Religious Schools (SAR), 7 in Private Islamic Primary Schools, 7 in Private Islamic Tahfiz Primary Schools, and 28 KAFA classes conducted in rented premises.
These classes altogether involve a total of 54,844 pupils and 2,088 pupils, 2,088 teachers. All these schools implement the KAFA curriculum coordinated by the Department of Islamic Development Malaysia (JAKIM).
According to the JAKIM KAFA guidelines, the ratio between the number of teachers and the number of pupils is 1:25.
For the Seremban District, number of teachers – 923, number of pupils is 26,689 – 1:29.
For Kuala Pilah – 176, number of pupils 3,770 – 1:21.
For Port Dickson – 228 teachers, number of pupils 5,935 – 1:26.
For Rembau – 163 teachers for 2,968 pupils – 1:18.
For Tampin – 205 teachers for 4,846 pupils – 1:24.
Jelebu – 114 teachers, 2,838 pupils – 1:25.
And Jempol – 279 teachers with, with 7,798 pupils – 1:28.
The comparison of totals, thank you, Dato' Yang Dipertua.
Thank you, Honourable Sikamat. I now invite the Honourable Temiang.
Thank, thank you, Dato' Yang Dipertua Dewan, I submit my third question.
Thank you, Dato' Mr Speaker, thank you for the question from the Honourable Member for Temiang regarding abandoned land. For the information of the Honourable Member for Temiang, the Local Authority (PBT) will take action by issuing a notice under Section 74 of the Akta Kerajaan Tempatan 1976 (Akta 171), directing the landowners to clear the overgrown land, the overgrown land concerned, within the stipulated period.
If the landowner fails to comply with the notice issued, then court action will be taken and the owner may be fined not exceeding RM1,000.00 or imprisoned for a period not exceeding 6 months, or both. For any repeated case, it will be referred to the Local Authority Legal and Enforcement Department (Jabatan Undang-Undang Dan Penguatkuasaan PBT) for seizure and auction action.
For the information of the Honourable Member for Temiang, as of October 2021, only the Jempol Municipal Council (Majlis Perbandaran Jempol) has issued 3 compounds to owners who deliberately allowed their land to become forest. Other PBTs have only issued nuisance notices. Thank you.
Dato' Mr Speaker, Speaker of the House, I have a supplementary question. Firstly, I would like to extend congratulations to the Seremban City Council (MBS) for taking steps such as putting up banners to remind landowners who deliberately allow land or buildings to be abandoned. However, I feel this action is not yet strict enough, because most of these landowners do not care about the banners, the notices or the compounds. So I would like to ask, can the State Government seize the land, the ownership rights of these landowners, if these cases are repeated? For repeated cases, yes. This is the first point.
The second concerns an abandoned land case for lot number 10535, Bandar Seremban, Daerah Seremban. The land is located near Taman Seri Pulai 3, at the bend of Jalan Temiang before entering Taman Seri Pulai 3, where the tree branches have grown so long that they reach, reach the middle of the road. So when trailers and large lorries pass along the road, motorcyclists, motorcycle riders, face the risk of accidents when the branches hit them. The land has been abandoned for a long time and I hope the MBS will take this seriously and take firm action against the owner of this land.
Thank you for the supplementary question from the Honourable Member for Temiang. For the information of the Honourable Member for Temiang, earlier the Honourable Member for Temiang asked whether the State Government can seize abandoned land or houses. For the information of this august House, the answer is: no. There is no legal authority that allows the State Government to seize abandoned land or houses. At the PBT level, power is only given under Section 83(1) of the Akta Kerajaan Tempatan 1976, where if a house poses a danger or disaster to public health or nearby residents, an application may be made to the Magistrate's Court to obtain an order to demolish, and after obtaining the order from the court, the residential house may be demolished within the period stated in the order.
And regarding the complaint that has been submitted by the Honourable Member for Temiang, I understand the Seremban City Council has already made efforts to identify the owner of the land. And we will issue a clean-up notice to the owner of the land. So, for, if the same problem persists after complaints, I welcome the Honourable Member for Temiang to submit this complaint to the Seremban City Council or to me personally. Thank you.
Additional, supplementary question, Kampung Baru Jimah Jaya. At Taman Jimah Jaya Site C, there are also house sites that only have roofs, and some land has turned into scrubland. So I request action from the Port Dickson Municipal Council (MPPD) or anyone who can take action against these abandoned houses and land. Thank you.
Okay, thank you, Honourable Member Chuah. Perhaps after this, Honourable Member Chuah can give the details lah to the MPPD, and I request the MPPD to take appropriate action. Thank you.
I now invite the question from Bagan Pinang.
Thank you, Dato' Mr Speaker. I submit the first question. Thank you.
Dato' Mr Speaker, thank you to the State Assemblyman (ADUN) for Bagan Pinang for the question regarding car parking at tourist areas. Dato' Mr Speaker, the parking requirements for tourist areas in development areas, such as hotel areas and other privately owned tourist areas, have been stipulated in the approval of Planning Permission (Kebenaran Merancang) under the guidelines that have been set. As for parking requirements at public tourist areas, the MPPD has held several series of discussions with nearby landowners to make the land available as temporary parking, especially during weekends and public holidays.
And we are well aware that Port Dickson in particular is indeed short of parking, and we acknowledge this because the land along, the land along the Port Dickson coastline has all, all been owned, yes. This makes it difficult for the State Government to plan to obtain areas for parking vehicles. So this is one of the things we are facing now, especially when tourists come to Port Dickson. Roads become congested because they park their vehicles on the sides of the main roads. So this is one of the issues that we have not yet been able to resolve, given that the lan, the landowners are still, owned by certain individuals, and they do not allow the MPPD to use the land as temporary parking. Thank you, Dato' Mr Speaker.
Dato' Mr Speaker, I see this matter is a serious issue regarding parking at tourist areas. I hope the State Government takes swift steps to overcome the shortage of parking, which, as we know, the presence of tourists to Port Dickson, as mentioned by the Honourable Member for Sikamat, the Most Honourable Member for Sikamat, domestic tourists are increasing day by day. So with this parking shortage problem, it will, firstly, it will affect our tourism industry, because visitors will not come if there is a parking problem. And we know that traffic congestion is partly because they are looking for, or whatever, taking time to park their cars along the roads. So I hope this matter can be expedited, and one of the sources of income for local people is through the arrival of tourists to Port Dickson. So this is a source of income for local people and also indirectly a source of income for the State Government. So, that is what I hope from the State Government. Thank you.
Thank you to the Honourable State Assemblyman for Bagan Pinang for the supplementary question. Earlier I stated that when the lands along the coast were granted and developed. And we see today, we, when planning was not in place at the early stage, this makes the current situation very difficult. And as I said earlier, the real, main problem is the, the land to be used as the parking site. And I hope that if there are individuals who wish to cooperate with the MPPD to, to, to provide parking spaces, they are very, very welcome. And we also hope this can help further boost tourism in the Port Dickson District. Thank you, Dato' Mr Speaker.
Thank you, Honourable Member for Bagan Pinang, thank you to the Most Honourable Member for Sikamat. Next, we go to the question from the Honourable Member for Rahang.
Thank you, Mr Speaker, Rahang submits the first question.
Dato' Mr Speaker, for the information of the Honourable Members, based on the records of the Employment Insurance System (SIP) of PERKESO, the total number of workers who lost their jobs in Rahang since March 2020 until 22 October 2021 is 80 people.
The Government takes seriously the issue of unemployment in this country, including in Negeri Sembilan. The Government, through PERKESO, provides a protection scheme for its contributors under the Akta Sistem Insurans Pekerjaan 2017, which was enforced starting 1 January 2018, and plays a role in helping Insured Persons who have lost their jobs. Assistance under the Employment Insurance System consists of the following financial benefits and job search assistance:
Job Search Allowance;
Early Re-employment Allowance;
Reduced Income Allowance;
Training Allowance for Insured Persons who become trainees, who are undergoing training;
Training Fee Financing; and
Job search assistance by PERKESO Employment Service Officers.
In addition, the Government through PERKESO has also implemented the Career Generator Programme (Program Penjana Kerjaya) and several other initiatives such as:
i. Incentives to employers who hire workers aged 40 years and below;
ii. Incentives to employers who hire workers aged 40 years and above, OKU and ex-prisoners;
iii. Incentives for the recruitment of Apprentices among school leavers and also graduates aged 18 – 30 years;
iv. Expansion of worker recruitment incentives under the Gig Career Programme;
v. Incentives, Employment Placement Incentives by Private Employment Agencies; and
vi. Malaysianization Programme to encourage employers to replace foreign workers with local workers.
In addition, as I stated yesterday, the State Government also provides one-off assistance, namely the loss assistance initiative, income loss assistance incentive with an allocation of 3.0 million, and also the organising of career carnivals periodically in, in several districts or areas that can offer many job opportunities. Thank you.
Supplementary question. Negeri Sembilan is also not exempt from the COVID-19 pandemic. And the problem of worker retrenchment has occurred in Negeri Sembilan. Please provide statistics on worker retrenchment and the unemployment rate in Negeri Sembilan.
Okay, thank you. So there are 2, namely worker retrenchment, workers in Negeri Sembilan and also the unemployment, unemployment rate. Namely according to records, worker retrenchment, up until October 2021 totalled 569 people and compensation totalling 25.8 million has been paid. This involves several sectors. The manufacturing sector, the manufacturing sector, services, retail,
transportation, banking and also engineering. Apart from that, in addition to job retrenchment, there were also issues related to temporary lay-offs and also salary reductions. This is higher than overall worker retrenchment. Where from January to, starting January – October 2021, temporary lay-offs involved 11 employers and salary reductions involved 51 employers. And the total, the total number of workers temporarily laid off and also subjected to salary reductions is 2,441 people. And this involves the hotel sector, which is the highest with 604 workers.
And one more is the issue related to unemployment. In Negeri Sembilan, the unemployment rate is 3.8% and lower compared to the national level of 4.8%. Thank you.
Thank you, Honourable Member for Nilai, Honourable Member for Rahang. Next, we go to question number 8, Gemas, Honourable Member for Gemas.
Dato' Mr Speaker, I submit question number 1.
Thank you to Dato' Mr Speaker. Thank you to the State Assemblyman (ADUN) for Gemas who asked the question regarding river water pollution, in the Muar River. Dato' Mr Speaker, the Department of Environment (JAS) gives serious attention to complaints of water pollution that may cause the quality of river water, especially the Muar River, to be increasingly affected.
This department has carried out investigations into complaints involving river pollution and identified the causes of the pollution. This department has also taken action against premises identified as causing pollution, namely Notice of Direction under Sections 31 and 37, Environmental Quality Act 1974 to immediately stop the pollution and take rectification and, the, control measures so that the incident does not recur.
Manual water quality monitoring programme of the Muar River is carried out at 10 monitoring stations on a monthly basis. This department has also installed a continuous river water monitoring station (continous water quality monitoring) in the Muar River to monitor water quality continuously.
In addition, this department also conducts periodic patrols on public holidays or holidays and weekends to ensure that no activities that may cause water or air pollution take place. Thank you.
Tambahan?
Okay, supplementary question, Dato' Mr Speaker. What I wish to raise is the river pollution involved in my area, namely Gemas, starting from Rompin, Pekan Rompin heading to Kampung Kurndia Diraja, heading to Kampung Pasir Besar. Then further to the Pasir Besar Water Treatment Plant, the Londah Water Treatment Plant and at Kampung Londah, the waters of the Kampung Londah padi fields. So we have received complaints from the local community that the discharge of toxic wastes, especially oil spills and so on, can be detected during high tides, heavy rain upstream, causing the irrigation or the toxic waste or those materials to be discharged into the river and causing the river surface water to turn black or whatever. And I feel how much of a loss it would be if we do not detect it early, we will see side effects, especially the fish fry released into the Muar River will die. And then what we are worried about most is the use of that water for drinking by humans, by the local community at the water treatment plant in Pasir Besar, which causes almost all of the Felda Jelai Cluster and in traditional villages to be affected. And at the Londah Water Treatment Plant, it involves almost all of Pekan Gemas, the army camp and most of the Palong Cluster. So I hope that this pollution can be given serious attention. And I, I also saw, congratulations to SAINS who tried to help identify, when there are oil spills, they will try to monitor, and we fear the spill will enter the, the, the water treatment plant and will affect the water quality. So, I hope for the necessary actions to be taken. That is all, thank you.
Thank you to the ADUN for Gemas. Indeed, the Department of Environment and related agencies take seriously the issue of river pollution. We are indeed taking action to monitor rivers in Negeri Sembilan. And if there are any complaints, they can be forwarded to the Department of Environment or any department, water supply, BKSA, so that action can be taken immediately.
And I also remind the public, let us together take care of our rivers because these rivers are the source of drinking water for us and we must take good care of these rivers. And also, we also have the River Trail Programme (Program Denai Sungai) being implemented, currently being implemented. Its purpose is to create awareness among the public of how important these rivers are to us and to prevent suspicious activities such as dumping oil into rivers and so on, can be restrained or controlled properly. That is why we have this trail programme for the people to work together with the government to ensure these rivers can be monitored better and also to take swift action to prevent any serious issues. Thank you.
Thank you, Honourable Member for Repah. Next I invite the Honourable Member for Lobak.
Thank you, Dato' Speaker, I submit the second question.
Thank you, Dato' Mr Speaker, thank you for the question from the Honourable Member for Lobak regarding the hall site. The question from the Honourable Member for Lobak reads: please state carefully the total number of halls and village halls in the State Constituency (DUN) of Lobak. And second: please provide information on the size of the hall or village hall and the exact location.
For the information of the Honourable Member for Lobak, there are no halls and village halls managed under the Seremban City Council and the Seremban District and Land Office in the DUN Lobak area. Thank you.
Dato' Speaker, as I said when I debated earlier, we have already conducted this investigation, there are indeed 2 village halls in DUN Lobak, namely at Desa Temiang and Mutiara. So we hope the investigation must have proper standards. Although this is from the information from the MBS or from the District, but according to the information I received, in the Seremban District, there are a total of 20 multipurpose halls and 140 village halls in the Seremban District. What was earlier, DUN Lobak, we requested because yesterday I said, in the Temiang zone there are 2 village halls, there may indeed be enough. But in the Templer zone and between Lobak, there are absolutely none, those multipurpose halls and village halls. Here my question is, state carefully with hall data. But as I understand it, I once asked in this august House, that empty lands, flat lands or land for religious purposes or open spaces, indeed exist in the Templer and Lobak zones. I hope you will review, if possible provide the most accurate information, because indeed there are these empty lands, but I don't know whether they, have already been applied for by a third party or not. If not, I hope the PBT makes a definitive explanation. And I will apply as a multipurpose hall. Thank you.
Thank you for the supplementary question from the Honourable Lobak. The proposal and views of the Honourable Lobak, we will study them. I really do agree with the Honourable Lobak. Suppose in the Lobak area, especially around Templer, there is no community hall or village hall, I think, yes, it is appropriate that we can consider it. However, in terms of landbank or land, I, well, I request the Seremban District Office and also the Seremban City Council (MBS) to study it, to see whether there is suitable land there to build a village hall or hall. So once again I thank the Honourable Lobak, who has already informed this House. At least there is an effort from the government to identify a suitable site.
I think the most important thing is that there must be a suitable site. If there is a suitable site, of course the government will implement it. And I also request the good offices of the Honourable Member, the Honourable Lobak, so that, suppose the Honourable Lobak also identifies open spaces or places that have never been used by any party, perhaps you could also submit that proposal to the State Government. We will give it consideration. Thank you.
Mr Speaker, supplementary question. We request that if the local authorities (PBT) could help check again quickly and very efficiently. Furthermore, if possible, give one list for the Lobak State Legislative Assembly (DUN). That is all, thank you.
Thank you, Honourable Lobak, Honourable Rantau. Next, Honourable Lenggeng. Sungai Lui.
Sungai Lui.
Maaf ya.
Mr Speaker, I put forward my first question.
Mr Speaker, thank you to the Honourable State Assemblyman for Sungai Lui. A question regarding the religion of Islam. Mr Speaker, the Orang Asli community practises various religions such as Islam, Christianity, Buddhism and animism. Accordingly, all matters relating to Islam among the Orang Asli community are handled by the Dakwah Division of the Department of Islamic Development Malaysia (JAKIM), the Negeri Sembilan Islamic Religious Affairs Office and the Negeri Sembilan Islamic Religious Council (MAINS). Up to now, the number of Orang Asli who are Muslims is 3,095 people in Negeri Sembilan.
From time to time the State Government builds religious infrastructure for the benefit of Orang Asli who are Muslims. Up to today, the State Government has built a total of 36 Orang Asli surau. In 2020, 4 new surau were built with an allocation worth 600 thousand ringgit.
The Negeri Sembilan Islamic Religious Council also plays a role in helping the Orang Asli community. MAINS has launched the "Baitul Rahmah" programme, namely a housing assistance scheme for Orang Asli who are Muslims. A total of 8 Orang Asli houses were built with a total allocation of 409,600.00 ringgit in 2021. Other forms of assistance continue, involving expenditure of 1.6 million until October 2021.
For guidance purposes, a total of 21 Orang Asli Community Mobilisers (PMOA) have been appointed and are working in the designated Orang Asli villages. The Negeri Sembilan Islamic Religious Council has also appointed 60 Rakan Ziarah (visiting friends) who also play a role in providing guidance and looking after their welfare.
The Orang Asli surau that have been built are:
in Kedat, at the Kedat Orang Asli Village Surau in Mantin Seremban; Ngoi-Ngoi Orang Asli Village Surau, Pantai Seremban; Bertam Orang Asli Village Surau, Jelebu; and Orang Asli Village Surau at Bukit Kepong in Port Dickson.
Meanwhile, 8 houses, 8 Baitul Rahmah houses that have been completed by the Islamic Religious Council, are:
At Kedat Orang Asli Village, Seremban District, DUN Nilai, number of houses – 1, occupant is Faridah Bt Gayut;
Tohor Orang Asli Village, Jelebu in DUN Chennah, number of houses – 1 for occupant Zaleha Bt Ismail;
At Sungai Sot Orang Asli Village, Jempol District, number of houses – 3, occupants of the houses are Mohd Ridhuan bin Abdullah, Remi bin Atang and Sahir bin Abdullah; Panchor Orang Asli Village, Jempol District, DUN Jeram Padang, number of houses – 3, the occupants are Nakashukor Bin Dondong, and Erni Bt Salleh along with Nurul Shaina Bt Abdullah.
The estimated price of the house is 51,200.00 ringgit. Its area is 32 x 20 feet (640 square feet), and the house has 3 bedrooms, a living room, has 3 bedrooms, 1 bathroom, 1 toilet and a kitchen area.
In addition, welfare for Orang Asli for the year 2021 is also provided, namely General Welfare Assistance of 37,171.00 ringgit, Education Assistance – 2,750.00 ringgit, Hari Raya Aidilfitri Assistance – 238,800.00 ringgit, Conversion Gratuity – 100 thousand ringgit and Basic Food Assistance – 1.23 million.
The following is the number of PMO, Orang Asli community developers by district: Seremban has 5 people, Jelebu – 5 people, Jempol – 5 people, Kuala Pilah – 3 people, Rembau – one person, Tampin – one person and Port Dickson – one person. Thank you, Mr Speaker.
Thank you, the Most Honourable Member. I would like to inform this sitting today that the Honourable Rantau is not feeling well after taking an injection, an injection, what's it called, a booster. For your information, members. Kira Serting and Gemencheh have an appointment with the IJN, yes. I invite the next question from Lenggeng.
Mr Speaker, I put forward my first question.
Mr Speaker, thank you to the State Assemblyman for Lenggeng, namely the changes and reforms of the Department of Islamic Religious Affairs.
Mr Speaker, for the information of this honourable House, in order to further strengthen the management and administration of the Negeri Sembilan Department of Islamic Religious Affairs in achieving the mission of implementing Islamic affairs policies to the people of Negeri Sembilan through quality governance and fulfilling the aspiration of the vision of the Department of Islamic Religious Affairs, namely "Catalyst of a Prosperous Ummah", the Department of Islamic Religious Affairs has held a Departmental Strategic Plan 2020-2024 covering the following matters:
i. Firstly, Expansion of Dakwah. The Department of Islamic Religious Affairs has changed the approach to dakwah among the Muslim community in Negeri Sembilan, namely by approaching them from house to house or through the branding of the Door to Door programme. Besides that, the Negeri Sembilan Department of Islamic Religious Affairs is strengthening dakwah bil hal through outreach programmes assisting disaster victims.
The Department of Islamic Religious Affairs also focuses on programmes with youths through the implementation of activities liked by youths. Among the programmes carried out are e-Sports tournaments such as PUBG and FIFA competitions, Treasure Hunt Online, hiking programmes, cycling and motorcycle convoys. All these programmes aim to bring the Department of Islamic Religious Affairs closer to young people.
ii. Secondly, Government, strengthening education. The State Government has announced the upgrading of Maahad Ahmadi to a State Government Fully Residential Religious School starting in 2021. In addition, the Malaysian Higher Religious Certificate (STAM) class has been separated from Maahad Ahmadi and will have its own complex on the existing site, in line with the successive achievements made by candidates in Negeri Sembilan at the national level. In terms of educational management, the Department of Islamic Religious Affairs has developed and implemented a programme to improve the professionalism of KAFA teachers, the Department of Islamic Religious Affairs in collaboration with the Raja Malewar Teacher Training Institute through the Professional Islamic Teacher Assessment (PiTAS) module.
In terms of management, the Department of Islamic Religious Affairs has developed the Negeri Sembilan Islamic Education Quality Standard (SKPiNS). In line with the Industrial Revolution 4.0, the Department of Islamic Religious Affairs has also introduced a virtual education concept known as the Negeri Sembilan Islamic Virtual School of the Department of Islamic Religious Affairs using the Google Classroom method. The first learning module that has been carried out is a 3-month Al-Quran Studies class.
iii. Establishment of the Tarannum Academy. The Negeri Sembilan Department of Islamic Religious Affairs is committed to producing champions in Al-Quran recitation (tilawah) and Al-Quran memorisation. Therefore, starting in 2019, the format of the State Al-Quran Recitation competition has been changed. Qari and qariah will go through a talent selection session. Those who succeed will be absorbed through the academy to be trained by coaches comprising international champions, in addition to judges at national and international levels.
iv. Establishment of the Negeri Sembilan Mosque Volunteers (SUKMAS). For the purpose of strengthening dakwah bil hal, the Department of Islamic Religious Affairs has established SUKMAS, which operates under the management of the Negeri Sembilan Mosque. SUKMAS also opens participation to the public to jointly help
those in need across races and religions. So far, SUKMAS has sent many urgent aid to victims of calamity throughout the previous Movement Control Order (PKP).
v. Democratisation of the Appointment of Qaryah Committees. In fulfilment of the mandate from the State Government, the Department of Islamic Religious Affairs has begun the process of democratising the selection of Qaryah Committees starting in 2020/2021.
vi. Upgrading of the Dewan Besar of the Dakwah Centre. The Dewan Besar of the Paroi Islamic Dakwah Centre has been upgraded to provide comfort to users at the Dakwah Centre. The hall has also now been fitted with an LED display measuring 9 metres x 3 metres.
vii. Brand Management. For the purpose of brand management, the Negeri Sembilan Department of Islamic Religious Affairs has begun by changing the vision and mission to be clearer and more suited to current challenges. Every activity carried out is based on the Strategic Objectives that have been developed together with the staff of the Department of Islamic Religious Affairs. To refresh its appearance, the Department of Islamic Religious Affairs now uses a green letterhead in every official dealing together with the state coat of arms. The Department of Islamic Religious Affairs also stipulates that all staff wear red ties and tudung on Mondays, and makes Wednesday the Fitness Day of the Negeri Sembilan Department of Islamic Religious Affairs. The Department of Islamic Religious Affairs is also very proud to have been given a new bus by the State Government.
The Headquarters of the Department of Islamic Religious Affairs has also been moved from Jalan Dato' Hamzah to Jalan Yam Tuan. With the support and backing of the State Government, 3 new district administrative complexes have been developed, namely in Jempol, in Jelebu and the most recent in Kuala Pilah.
viii. Service Efficiency. Starting in 2020, the Negeri Sembilan Department of Islamic Religious Affairs has begun issuing official documents within one working day. Among those that have been implemented are the issuance of marriage cards and certificates in line with the solemnisation ceremony, upon completion of the solemnisation ceremony carried out at religious offices, the issuance of school registration certificates in accordance with the stipulated requirements, as well as the issuance of slaughter authorisation cards and certificates.
ix. Strengthening Cyber Dakwah. Besides dakwah bil hal, the Department of Islamic Religious Affairs also carries out virtual dakwah programmes. In fact, besides Facebook, there is now the Negeri Sembilan Department of Islamic Religious Affairs TV via a YouTube channel, and it has Instagram, TikTok and also Twitter. Dakwah content can now be viewed all over the world.
Through the planning measures of this Departmental Strategic Plan, I am confident that the Negeri Sembilan Department of Islamic Religious Affairs is capable of becoming among the Negeri Sembilan Islamic Religious Departments, the best state in Malaysia with the cooperation and support of the State Government and the people of Negeri Sembilan, insyaAllah. Thank you, Mr Speaker.
Thank you, the Most Honourable Member.
YB ADUN Seri Menanti: Mr Speaker, may I have a little, a supplementary question?
Berkaitan?
Mr Speaker, yes, congratulations to the Most Honourable Sikamat. I guess, everything is already there, the new office and so on. When will the Negeri Sembilan State Government make polygamy easier? Easy, friends, Mr Speaker, thank you.
I have no experience in answering …..
Seri Menanti, isn't that enough?
…. This one, the experienced one …..
Still not enough?
….. Director with the Honourable Member …..
I did not ask about experience or no experience. This is power, this is the power of Mentori Bosar, Mr Speaker. Please ask Mentori Bosar to answer, Mr Speaker.
Polygamy is not prohibited in Islam, yes. And whoever is qualified, we welcome and encourage them to continue to add to or practise polygamy. So that is it, our hope is of course we do not prohibit it, there is nothing, we support it, yes, for those who are eligible, for those who are eligible to practise polygamy, they are welcome.
Dato’ Dipertua.
Because the marriage card is also issued …..
Dimudahkan.
…. after marriage, yes, made easier …..
Made easier. I agree, I agree. My question earlier was not answered by Mentori Bosar, the Most Honourable Sikamat. So, to make it easier. What it means is making polygamy easy, right, no need to go to court and so on, right. Made easier. About this …..
That is the rule lah ….
Ikut peraturanlah.
Eh, be quiet, Mr Speaker.
Mr Speaker, I, Mr Speaker, I represent the mothers' association of my constituency and ask that it not be made easier.
Bagus Chembong.
We follow the rules that have been set. Thank you.
Can I ask that question? Can the Speaker ask a question? Still not enough, Seri Menanti?
Satisfied, yes?
Mr Speaker, it is not that it is not enough. My friends here, if we talk about 2 or so, everyone stands up, Mr Speaker, right. So that is why I request in this House, to the Most Honourable Sikamat, make it easier, right. Give way, yes, to those who are keen, Mr Speaker.
Let us go straight to the question from the Honourable Linggi.
Okay, thank you, Mr Speaker, I would like to put forward my first question.
Mr Speaker, what is the inflation rate for Negeri Sembilan for the years 2020 and 2021, from the State Assemblyman for Linggi. For the information of the Honourable Members and this honourable House, Negeri Sembilan recorded an inflation rate of -1.6% for 2020. Meanwhile, for the period from January until 2021, inflation rose by 2.3% compared with -1.5% for January until September 2020.
The decline of -1.6% in 2020 was contributed by the Transport index (-11.8%), Housing, Water, Electricity, Gas & Other Fuels (-3.1%) and Clothing & Footwear (-0.6%), which contributed 36.9% to the overall weighting of the Consumer Price Index (CPI), Negeri Sembilan. On the other hand, Communication still showed a positive rate of 2.5%, followed by the Miscellaneous Goods & Services index (1.6%) and Food & Beverages (1.2%) compared with 2019.
Inflation began to record negative levels starting from March to December 2020. This followed the decline in the price of Unleaded Petrol RON95 which was, by the government, at a lower price of [RM]1.67 per litre in 2020 compared with 2.06 Malaysian Ringgit per litre in 2019. At that time everyone did not go out, everyone stayed at home. In addition, the average price of Unleaded Petrol RON97 decreased to [RM]1.99 sen per litre in 2020 compared with [RM]2.55 sen per litre in 2019, while the average price of Diesel decreased from [RM]1.80 sen per litre compared with [RM]2.18 sen in the previous year. This is in line with the price of Brent crude oil in 2020 which fell 33.9% to US$42.30 a barrel from 64.03 US cents a barrel in 2019. Likewise, the decline in the Housing, Water, Electricity, Gas & Other Fuels index was caused by the effect of discounts on electricity bills for domestic use as announced by the government under the National Economic Recovery Plan (PENJANA) from 1 April until December 2020.
However, starting March 2021, Negeri Sembilan's inflation has begun to record a positive rate. Inflation for the period January to September 2021 shows an increase of 2.3% compared with the same period in the previous year. This increase was driven mainly by a double-digit rise in the Transport group, namely 11.8%, following the ceiling price fixing of RON95 petrol at (RM)2.05 sen per litre since March 2021, which remains high compared with the average price of [RM]1.68 sen in September 2020.
This was followed by an increase in the Housing, Water, Electricity, Gas and Other Fuels index by 1.8% and the non-alcoholic Food & Beverages index (1.3%). The increase in non-alcoholic Food & Beverages was driven by the rise in the price of raw chicken in Negeri Sembilan in September 2021, which recorded an average price of [RM]8.87 sen per kilogram compared with [RM]7.90 sen in August 2021. Thank you, Mr Speaker.
Supplementary question, Mr Speaker. Thank you, the Most Honourable Sikamat. For the Negeri Sembilan State Government and matters within the jurisdiction of the Negeri Sembilan State Government, for example water utilities, which were just mentioned as among the contributors to this rise in inflation. And also food items mentioned earlier such as chicken. My question is, what immediate or instant measures can be taken to help reduce the prices of these goods or this rise in inflation, because we are well aware that currently, generally, the rise in the prices of goods is rather too high and very burdensome to the community. So for the Negeri Sembilan State Government and the scope within the State Government, what efforts are planned that will be carried out immediately?
Thank you, Mr Speaker. I thank you very much for the question. We know that SAINS, or Syarikat Air Negeri Sembilan, yes, is only a company that does not make large profits. In addition, we are also aware that SAINS bears several burdens that we have had to carry as a result of earlier agreements, and to this day these mean we are no longer able to provide subsidies. We want to give a price subsidy but we cannot afford it, because we have not raised the water tariff. At the Federal level, they asked for price increases to be harmonised across every state, but the Negeri Sembilan State Government did not agree in principle to an increase at that time.
For daily foodstuffs, thank God, this morning I was informed by the Agriculture EXCO that he has met all the Directors of the Department of Agriculture, the Department of Veterinary Services, and so on, and several others, to discuss what role the State Government can play in helping the public outside with high prices of goods. The prices are not just somewhat high, they are indeed high now. The burden borne by them with the prices of vegetables, chicken and daily necessities has risen. Not only that, the prices of housing goods have also risen. So these are among the factors faced by the people outside. And the State Government, I contacted the Honourable EXCO last night to discuss efforts to find solutions that will bring some benefit to the people outside, so that they can obtain the best and reasonable prices, insyaAllah.
So these are among the factors. We will also request and ask that the heads of departments help us in tackling these current issues. So, thank you, Mr Speaker.
Thank you, the Most Honourable Sikamat. I now invite the Honourable Chuah.
Mr Speaker, before I put forward question 1. I have also received an appeal to postpone the increase in the poultry farming licence fees. Recently the licence for poultry farming was raised. So I request that it be reconsidered, so that this may perhaps prevent an increase in the price of chicken too, chicken meat. With that, Chuah puts forward the first question.
Thank you, State Assemblyman Chuah, for your concern. The increase, the increase, yes, we are aware, as the Honourable Rantau said, we only get a whiff, we get a little from the operators, but the increase is excessive, it is not very large, only a little, compared with the profits being earned now. So I hope it is not such a high increase. We will review the matter, however, we will look at it. And I think the operators too must give support to the people in Negeri Sembilan by providing space for them to build, to, what, to rear chickens in Negeri Sembilan. We do not want us to rear chickens and have the chicken price the same as outside. Today we have roughly 25 million produced in Negeri Sembilan, chickens. And this should also give more benefit to the people of Negeri Sembilan by offering a lower price for sales throughout Negeri Sembilan, because our chickens are exported and sent out of Negeri Sembilan because they exceed the needs of Negeri Sembilan.
So I hope this matter can also be discussed with the chicken operators, and we have no problem in reviewing, in postponing a little time for these chicken operators …..
Mr Speaker, Dato' Speaker, may I interject?
Ya.
Regarding the increase in the poultry farming licence fees, as mentioned by the Most Honourable earlier, the increase is in fact very, very minimal. Up to 50 thousand birds, there is in fact no increase. And up to 100 thousand birds, the increase is only 0.1%, 0.1 sen per bird. And the increase, up to 250 thousand birds, is only 0.08 sen. Very minimal, and I think that is not a reason, as was said earlier, to raise the price of chicken. Very, very minimal compared with the fact that we have never increased these fees since the Poultry Enactment came into force, that is, for the past 10 years. That is all, thank you.
Okay, I will answer the first question: Sungai Rambai at Kampung Baru Tanah Merah Site A – the Honourable State Assemblyman Chuah. Mr Speaker, in principle the Sungai Rambai Flood Mitigation Plan (RTB) has been listed in the Twelfth Malaysia Plan with a ceiling cost of 11 million. The purpose of this project is to reduce the risk of flooding in the Kampung Baru Tanah Merah Site A area. At present, the JPS (Drainage and Irrigation Department) has appointed consultants to carry out the detailed design work for the Sungai Rambai RTB, and the design process is expected to be completed in mid-2022. Thank you, Mr Speaker.
Mr Speaker, a supplementary question. The ground level at Sungai Rambai is higher than the ground level of the Kampung Baru Site A residential area. Is there a plan to build separate drainage for the residential area to prevent water from overflowing or entering the residential area? Thank you.
Thank you for that information, and I hope that the consultant can look into the matter so as to ensure that the flooding problem at Tanah Merah Site A can be resolved once the flood mitigation programme under the Twelfth Malaysia Plan can be carried out in that area, yes. I hope that the JPS can provide that information to the relevant party, the consultant. Thank you, Mr Speaker.
Mr Speaker. Mr Speaker. Mr Speaker, question 14, Gemencheh. Gemencheh is not here, so I will go straight to my question, eh, can, Dato'? Gemencheh is not here ….
Mr Speaker, actually …..
Gemencheh is not in this honourable House.
….. the ADUN for Gemencheh has delegated me to ask the question on his behalf, if I may stand up.
Change, change the person. Linggi to ask.
Ya.
Gemencheh is not here.
Honourable Gemencheh has delegated me under Standing Order XV(5).
Yes, yes, yes, one question.
One question. This question is important because it relates to the question of the Honourable Seri Menanti earlier. Question 2.
Oh, earlier it was polygamy. This is about divorce, Mr Speaker, yes. Mr Speaker, in response to the question from the ADUN for Gemencheh, yes. Mr Speaker, for the information of the Honourable Members, the National Registration Department (JPN) registers marriages and divorces, correct? And divorces for non-Muslim couples are in accordance with the provisions under the Law Reform (Marriage and Divorce) Act 1976 [Act 164]. This Act does not apply to a native of Sabah, a native of Sarawak, or an Orang Asli of Peninsular Malaysia whose marriage and divorce are subject to the customary law of the natives or Orang Asli customary law, unless they choose to marry under this Act.
Based on JPN records from 2019 until 31 August 2021, a total of 1,418 divorces in Negeri Sembilan were registered. Based on JPN records for 2019 until 31 August 2021, a total of 32,606 divorces were registered throughout the country.
Based on the records of the Negeri Sembilan Department of Islamic Religious Affairs and the Syariah Court, in 2019, a total of 3,177 divorce cases were registered. In 2020, a total of 2,563 cases were registered. And for 2021, a total of 1,064 cases have been registered.
The State Government, through the Department of Islamic Religious Affairs, has provided advisory assistance to married couples who need counselling sessions conducted by trained officers. In addition, the Negeri Sembilan Department of Islamic Religious Affairs collaborates with the Counselling Division of the Negeri Sembilan Islamic Religious Council, the Department of Social Welfare, the National Population and Family Development Board (LPPKN), the National Anti-Drugs Agency (AADK) and others, specifically to provide guidance to couples facing problems.
Throughout the COVID-19 pandemic, the Department of Islamic Religious Affairs, the Department of Islamic Religious Affairs, has implemented online programmes to improve couples' understanding of aspects such as the following:
i. Borak Santai Janji Sampai: Ragam Cinta Pasca Pandemik Realiti @ Fantasi, Hanya pada Mu Aku Berserah;
ii. Webinar Bahagia Mencintaimu;
iii. Webinar Kasih Dijunjung Cinta Disanjung;
iv. Seminar Keibubapaan: “Penyuluh Jalan”;
v. Program Hijrah Merdeka Online;
vi. Karnival Ummah Sejahtera: Pertandingan Fotografi Keluarga Bahagia;
vii. Keluargaku Syurgaku: “Bukan Abang Tak Sayang.” – 5 Siri;
viii. Fiqh Wanita: “Aisyah dan Lailatul Qadarnya”;
ix. Program ziarah Door to Door Masih Ada yang Sayang; and
x. Ziarah Kasih: “Kongsi Rezeki” for various segments of society, covering troubled married couples, individuals undergoing drug rehabilitation programmes, teenagers and adults, by providing advice and donations of daily necessities to those in need.
Thank you, Mr Speaker.
Tambah jugak?
I want the Most Honourable Sikamat to answer as well, of course. That is what I proposed earlier, yes, to help resolve this problem, Mr Speaker. I propose to the Honourable Member, the Most Honourable Sikamat, that this matter be made easier, because when the ustaz told me, this is a sunnah, helping single mothers, Mr Speaker. Concessions and leniency must be given to those who are able, those like
sitting over there in front, yes. To help these people, Mr Speaker. So I propose making it easier, twice I have said it, Mr Speaker. Mr Speaker, if you want to ask more, please go ahead, Mr Speaker.
Thank you, Mr Speaker. I think we will take note of that question. Thank you, Mr Speaker.
Thank you to those who asked questions today, and thank you to those who gave answers. I think the time has already …..
Dato’ Dipertua.
….. has exceeded, to the envy of us all.
Mr Speaker.
Next time, never mind. It is finished, 11:35. Because after this is the winding-up. So I apologise to those whose oral questions we cannot continue. All questions that were not answered in time will be given in writing, yes. Please proceed.
Supply Bill (2022) 2021Bill
[Sambungan urusan]
Fourth item, Rang Undang-Undang Perbekalan (2022) 2021.
Honourable Members all, the debate session yesterday has been closed, yes. And today is only for the winding-up session, or answering questions, answering from, from the government side. I invite the government side to answer.
Thank you, Mr Speaker. Firstly, I thank the many Honourable Members who asked about youth and sports. Among them, the question raised by ADUN (State Assemblyman) Linggi, if I am not mistaken, concerns proposed solutions for futsal courts that are abandoned and not maintained. A total of 18 futsal courts in the Port Dickson District were handed over to the District Office by the District Youth Office, and almost all of them require repair and maintenance. This year the District Office has refurbished 3 futsal courts at Taman PD Utama, Taman Intan Perdana and Taman Desa Rusa, at a total cost of RM100 thousand ringgit. The district administration is planning to hand over all of these courts, especially those that have been refurbished, to the Village Community Management Council (MPKK) in stages. 2 futsal courts have already been handed over to MPKK Bagan Pinang and MPKK Teluk Kemang.
The next question came from the ADUN for Seremban Jaya, asking about a special multipurpose hall equipped with a hostel for athletes. The Negeri Sembilan State Government, through the Office of the State Secretary (SUK), already has a fully equipped sports complex with a hall for training at the Kompleks Sukan Seremban 2. The hall is a badminton hall that can be used for training for other suitable sports, especially COMBAT sports. In 2019, the Negeri Sembilan State Government, through the SUK Office, upgraded the space between badminton halls A and B, and it has been turned into a COMBAT sports arena.
In addition to a fully equipped hall, this complex has hostel facilities that can accommodate 100 male athletes and 64 female athletes. These facilities are supervised by the administration of the State Sports Council (MSN) of Negeri Sembilan for scheduling of use. Athletic teams that need to use the hall and hostel facilities must submit applications to MSN, and scheduling will be arranged to avoid clashes.
For everyone's information, I am pleased to say that yesterday the National Sports Council Complex, which was relocated from Keramat to Nilai, was officially opened. It has sports facilities for sepak takraw, yes, for archery, yes, and also several other sports which, although it belongs to the National Sports Council, we are confident that as the landlord, or as those located in Negeri Sembilan, we can make use of it. Our young people can make use of the National Sports Council Complex in Nilai, which is also next to the National Velodrome, the centre for cycling activities, the velodrome in Malaysia.
For everyone's information too, the Seremban 2 Sports Complex, for its squash centre, has also already begun an upgrade to make the squash centre of international standard, capable of running programmes of international standard, involving a cost of 6.0 million ringgit, yes. So, insyaAllah, the programme and project is, has already begun and is expected to be completed in 2023.
We have also held discussions with many parties to turn the Nilai Indoor Hall, which is now seen as a white elephant project, that is not used. This Nilai Indoor Hall has also been requested by the National Sports Council to be made part of the National Sports Council Complex. There has also been a request from FAM to make it a training centre for the national futsal squad, yes. It will be upgraded to become a complex for futsal of international standard too, insyaAllah, if it is agreed by the State Government, and it will be managed by the Football Association of Malaysia.
Regarding the question from the ADUN for Senaling on coaching. InsyaAllah, the need for coaching is very much required in efforts to produce athletes of international standard. Coaches with high knowledge of the technical skills of a field are indeed very much needed, have high market value, and are important for the process of developing new athletes to face international-level events.
The State Government, through the MSN of Negeri Sembilan, does provide assistance related to programmes organised by the State Sports Associations in an effort to raise the level of knowledge of coaches in the field of sports. This assistance will be channelled in the form of grants to the State Sports Associations to design coaching courses. However, the organisation of courses involving technical matters must receive cooperation and permission from the National Sports Associations.
On 15 – 19 November last year, the Negeri Sembilan Sepak Takraw Association, with the cooperation of the Malaysian Sepak Takraw Association, organised a Level 1 Coaching Course held at the Paroi Islamic Da'wah Centre, which was attended by takraw coaches among teachers from all over Negeri Sembilan. Alhamdulillah, takraw has shown good performance. The NS Antlers team took fourth place, yes, and succeeded in reaching the semi-finals of the STL in 2020 last year. And in this year of 2021, it will begin in January this year.
Likewise, the Negeri Sembilan Football Association has held many coaching courses. Among them, grassroots coaching was held 2 times in 2020, FAM coaching course for Level D, yes – 1 time in 2020, FAM D coaching also in 2021, and now the FAM diploma or AFC Grade C coaching course is taking place at this time. So the Majlis Sukan Negeri, with the cooperation of the Negeri Sembilan State Education Department, is also currently designing a coaching and technical development programme involving coaches from among school teachers.
The ADUN for Bagan Pinang asked about the Teluk Kemang Rakan Sukan Complex. The State Government is in the process of taking over the management of the Teluk Kemang Rakan Sukan Complex to be redeveloped for the use of children, athletes and suitable sports programmes. The direction for the Teluk Kemang Sports Complex is, firstly, the football field, yes, it has a football field. This football field is being worked on to be turned into a centre of excellence for rugby in Negeri Sembilan, yes. We do not have a dedicated rugby field. So, mostly, we share the field of SMK KGV, which is the school's own field. So that is where many rugby tournaments are held. Rugby has begun to gain a place among school students and we will work to make the football field at the Teluk Kemang Sports Complex a dedicated rugby sports field, the first in Negeri Sembilan. The complex also has an indoor hall. This indoor hall will be opened for rental to local residents, school students, sports associations and interested individuals. It is suitable for COMBAT sports, badminton, ping pong and indoor sports programmes.
The facilities available at the Kompleks Sukan Rakan Muda Teluk Kemang are a multipurpose indoor hall, 6 multipurpose badminton courts, a football field, a floodlit outdoor futsal court, a floodlit outdoor tennis court, an outdoor sepak takraw court, an office space, a surau and a store. The indoor hall of the Teluk Kemang Sports Complex was once used as a competition venue for taekwondo and karate-do events when Negeri Sembilan hosted SUKMA in 2004 last year. Several programmes, activities and rentals have been held at the indoor hall of the Teluk Kemang Sports Complex. Among them were wedding ceremonies, a sepak takraw carnival tournament, rentals by the Malaysian Youth Development Academy, and also sports tournaments from nearby schools.
ADUN, Dato', ADUN Senaling, yes. ADUN Juasseh, my apologies, asked about the Football Cup Tournament of the Honourable Menteri Besar which is currently taking place, but it was found that party flags were being raised. In principle, the secretariat agrees that we have never directed that flags be displayed. But this Football Cup Tournament of the Honourable Menteri Besar has not been held for quite a long time. And it has attracted the interest of young people, yes, with the participation of nearly 5,000 young people. And there are some among them who are rather enthusiastic, yes, and they are used to, when they want to say thank you, they raise party flags.
They said that before it was allowed, even flags were raised on the goalposts, their party flags, they said. But never mind, we will help to, to educate them so that they are careful about raising these party flags, yes. We do not want incidents from the previous government, yes, the Da'wah Centre at Paroi, too, was once full of flags. We remember the Da'wah Centre had changed into a party activity centre, right. Yet it is even clearer that the Da'wah Centre must be seen as neutral, not taking sides with anyone. However, we have been in government for 3 years, and we have never used government premises to hold annual general meetings and so on, general assemblies and so on.
I was also asked by the Honourable Menteri Besar because of the cemetery land at Forest Heights, which people say, or which was touched upon by the Honourable Chembong. For everyone's information, the platform construction work, namely terracing, yes, because the Forest Heights Cemetery has become full, the old plot, and we have a new plot next to it, which is on a hillside. So, for us to make or dig graves, we need to form terraces or platforms so that the soil does not slide down when it rains, yes, does not, does not flow down. So the work is expected to be completed on 25 December 2021, and will be handed over to the Cleansing and Environmental Health Department of MPS 2 weeks after the completion date. This area is expected to be usable in February 2022. To overcome the problem of stagnant water in the existing cemetery area, drain construction work began on 6 December 2021 and is expected to be completed on 27 December 2021.
So, as we are well aware, the Forest Heights Cemetery, we found, is actually land that is not suitable to be made into a cemetery because it is a swampy area with a water spring. So when the grave pit is dug, Mr Speaker, water comes out and stagnates, causing the body to be unable to be buried. Or if it is buried, it will cause, what, it to be submerged in water. So one of the causes we identified was that during the process of determining, or when we applied for Planning Permission by the OSC, the Islamic Religious Affairs Department should have been involved in the special committee, the OSC committee, so that when the developer determines a site to be made into a cemetery, the Islamic Religious Affairs Department can come and check whether the land is suitable or not, yes. Whether it is swampy or not. Sometimes developers, we do not make accusations, but there are developers who deliberately hand over land that is difficult, that has problems, to be made into burial sites, yes, school sites and so on. In the end this causes difficulties. So the Pakatan Harapan Government, we have made improvements, starting from the year 2020, the OSC Committee will include a representative from the Negeri Sembilan Islamic Religious Affairs Department. So that when there are issues related to cemetery land, mosque sites, yes, and so on, officers of the Islamic Religious Affairs Department can go to the site to assess and give their comments and views in the OSC approval committee. So this is an improvement made by the Honourable Sikamat to avoid further issues related to mosque land, school land and temple sites. This happened under the previous government administration, which in the end, when, when, what, after the transition of government, various issues arose. It means this matter was not managed better at the early stage when we approved the Planning Permission.
Mr Speaker, Kota also asked about cemeteries that, he said, are crooked, not straight, yes. So cemeteries that are not straight are old cemeteries, yes. The old ones. The crooked ones are usually the old ones. The new ones, insyaAllah, at Ainsdale, the Islamic cemetery at Ainsdale, this new Forest Heights cemetery plot and also the cemetery we have managed to make at Kariah Kuala Sawah, Rantau, which has become full, we have obtained a new site, the Honourable Member also went to visit, yes. We have obtained a new cemetery site. There is even a bridge we have built. The road has also been tarred. InsyaAllah, these new cemeteries, we will ensure they are made in an orderly manner with the right methods, with the best area, good arrangement.
And the construction of the kalung, yes, called kelung, I am not sure what the term is, which, which is made for, for the grave, right. Usually the heirs will build the grave kerb. It will also be built to a standard, no one can make it higher, some people want marble, some people want it like this, it is not allowed, yes. There must be no, no one saying there should be levels for graves, all the same, yes. Rich people cannot do it like that, poor people without money just put in bricks, not allowed. We will make a standard. And I would like to propose to the Seremban City Council that the contract that will manage this, we should open it, yes. I have been informed that there were requests from old contractors that they also be included as parties who can manage the construction of these grave kerbs, right. So we should not fix it to one party only. So insyaAllah we will try to do our best, yes, to.
Regarding the question about age, yes, the age from the ADUN for Gemencheh, age, the youth age policy, yes, under, 30 years old, yes. So, this relates to the Youth Societies and Youth Development (Amendment) Bill 2019 (Act 668), yes. The issue of the youth age limit has been discussed since 2007 when the Youth Societies and Youth Development Act (Act 668) was first introduced. At that time the Malaysian Youth Council and the Ministry of Youth and Sports had reached a consensus, yes, they agreed on the youth age limit, 15 – 40 years. That was in 2007. Towards 2015, the National Youth Policy first introduced by the then Minister of Youth and Sports was Honourable Khairy Jamaluddin, yes. The Malaysian Youth Policy brought a new vision in interpreting this youth age, yes. The youth age limit was to be reduced from 40 years to 30 years. This was approved or discussed in the Malaysian Youth Policy by Honourable Khairy Jamaluddin. And in that discussion, it would be implemented within a period of 5 years, yes, starting from 2015, by the end of 2020 it would be implemented. Internationally, in fact, all over the world, Malaysia is among the countries that still maintain the age of 40. African countries only recognise youth aged 35 and below. Malaysia is the only one that still has age 40. So the time has come for us to look at this matter. The State Government agrees with this policy.
And what is important, we must understand that the Malaysian Youth Policy and its implementation is under the responsibility of the Federal Government. The State Government will only follow what has been approved. The Bill was passed in 2019, related to this Malaysian Youth Policy, regarding this youth age limit, yes. So our mistakes and weaknesses, and youth leadership, Negeri Sembilan, is to make preparations to train new leadership. I repeat again, that I am very concerned that good leadership is leadership that is ready to produce new leadership. Do not always just old people. We must be ready to give this opportunity of leadership to new young figures, who can bring about better changes, yes.
I will give an example, the Persatuan Belia Dinamik Barat, Saudara Zaharuddin has begun to make a leadership transition. Today, the Persatuan Belia Dinamik Barat, which is very popular with the National Youth Award, or called the Duke of Edinburgh's, yes, an award where we give gold, silver and bronze medals to these youth figures, who have gone through various programmes. It was, was monopolised or, was, pioneered by the Persatuan Belia Dinamik Barat, to the extent that Negeri Sembilan became the best state in terms of this Anugerah Belia Perdana, yes, which is among the states that produce the most youths who receive gold medal awards, yes.
I think that is all. Finally, I would like to take the opportunity also to touch on, yes, because many opposition parties talked about the Melaka State Election. I too am interested in this Melaka State Election.
Only, for me, I cannot bring myself to congratulate YB Chembong. For me, the term I want to use is condolences, yes. One, because it is a responsibility. Two, because it reflects the attitude of UMNO and Barisan Nasional towards the principles of comradeship, the principles of friendship in politics, consensus in politics. We look at our nation's history. The Pakatan Harapan Government was formed in 2018. It was brought down by traitors who conspired at that time, yes, between UMNO Barisan Nasional and some of PKR, BERSATU, which in the end brought down the Pakatan Harapan Government and formed the Perikatan Nasional Government led by Honourable Tan Sri Muhyiddin Yasin. In the end this father's government also fell, yes, due to another betrayal by UMNO Barisan Nasional, which in the end raised the Honourable Datuk Seri Ismail Sabri.
For me, it reflects how the rhetoric about the unity of Malay supremacy and Islamic supremacy is merely sweet on the lips, and not a struggle that comes from their soul and heart. I heard a video clip of how Honourable Rantau mocked the lebai-lebai directed at the PAS Party, that PAS was willing not to use their logo .....
Dato’ Dipertua.
….. kerana hendakkan kuasa …..
What's the matter, Dato’ Dipertua? I only asked the other day whether you wanted to congratulate me. That's all.
It's alright, sit, sit, listen first.
….. that is …...
I did not disturb the Honourable Member while he was speaking …..
Don't get emotional, okay.
I did not interrupt, listen to my speech first.
Don't get emotional, Dato’ Dipertua …..
Listen, if I am wrong, cover your ears; if I am right, correct me, okay. So this illustrates their attitude in this country's politics, okay. The people must be aware that if they who are together can, can, unite, yes, use the slogan of Malay Islamic Supremacy to
win the votes of the Malays, in the end they quarrel and become enemies in the Melaka State Election. Insulting one another. And at that time there is no longer any rhetoric about …..
Dato’ Yang Dipertua.
….. Malay Islamic Supremacy.
Dato’ Yang Dipertua, yes. I seek clarification, Dato’ Dipertua. I seek clarification.
[off-mic conversation]
A question, a question. I just want to ask the government, I think we all agree that the remedy for this matter is to create an anti-party-hopping act or enactment. So why has the Negeri Sembilan Government not taken the opportunity to table it?
We actually do not need this anti-party-hopping act if the leaders and politicians are honest people. People who know their principles. Why do they offer themselves to the people. Why do they offer themselves to the people to be their representatives. That is why …..
We, we agree.
….. clear principles if …..
That we agree on.
….. they …..
That question should be directed to their own party.
Ha, that we agree on.
If they can keep changing …..
Many are hopping around, many are disloyal.
[off-mic conversation]
It is not a floor issue now. But the problem is, why is it like this …..
[off-mic conversation]
Okay.
[off-mic conversation]
Dato’ Speaker, even if he is the floor owner, he has strayed off track. If it is party-hopping, before …..
[off-mic conversation]
Listen first, listen first. [commotion in the Public Gallery]
Previously Paroi, previously he was in PAS. Now he has become Amanah. So there is no need to …..
I changed …..
….. so I did not …..
….. when I was not a representative of the people.
Dato’ Speaker, if he talks about this …..
Listen, listen first, be patient.
Dato’ Yang Dipertua …..
Don't talk about things like this …..
Menggulung sajalah.
…. that have nothing to do with it, nonsense being brought up in the House, to be told in the House.
Not one of us yesterday said anything about wrongdoing.
I can, can …..
What, what, is Paroi also …..
….. be patient, I can listen …..
….. traitor in PAS. I am asking.
You gentlemen speak, I can be patient, I can listen.
….. not that …..
….. that is what I am asking, is Paroi also a traitor in PAS …..
…. has nothing to do with the matter …..
….. like this, like this …..
….. yang you cerita tadi ….
….. Gemas, Paroi, Pertang …..
[commotion subsides]
Actually I have already given you all enough room, I too, listen, listen, listen, listen to me speak …
Can't accept it in Melaka, Barisan Nasional won, are you satisfied, Paroi?
Enough, enough, enough. The problem now is, you gentlemen too, if you talk about victory, I am not disturbing you, I am not, Palong …..
Okay, that we acknowledge …..
….. Palong talks the most. Two days in a row talking about victory in the …..
….. if you want to talk, backbenchers talk, I don't mind …..
….. that space is for the winners to be happy, and the losers must be sorrowful. But now, the, the …..
Dato’ Dipertua, sorrowful, okay, okay, okay.
Listen, listen, listen. I …..
Korang berdukacitalah.
Listen first, I am not stopping you gentlemen from being happy with the victory. I also did not tell anyone to sit and talk about it; yesterday Palong talked at length. Chembong, he is indeed skilled at sarcasm, teasing ….
Yesterday I asked Dato’ Dipertua, did you not want to congratulate us, that is all …..
Enough, enough, sit, sit, sit.
I only congratulated, I did not ask a question.
Duduk, duduk.
Never mind, as Dato’ Dipertua said just now, let us give the opportunity …..
Sorry, sit down Palong.
….. those who are sorrowful, he is okay …..
Sit down Palong, Pertang.
….. let us give an opportunity to those who are sorrowful, as Dato’ Speaker said just now. Please, Paroi, those who are sorrowful, as said by Yang Dipertua …..
Duduklah Pertang.
There are still 5 minutes left.
….. Honourable Paroi, continue.
We are waiting for the 15th election.
When will it be dissolved now.
The Prophet said, meaning …..
Paroi teruskan.
….. help the one who is oppressed and the ones who commit oppression. My companions were puzzled. How to help the one who is oppressed, that is understandable. A person whose house, in, in, in, has collapsed and so on, we help them. But the oppressor, the one who, who commits oppression, how do we help them? Thus the Prophet said, help by stopping them from committing oppression. Therefore, for that reason, yes, I see how the voter turnout in Melaka is very low. Why is it low? Because the people no longer trust the democratic process. The people say, yes, when they chose Pakatan Harapan in 2018, suddenly today ….. [commotion in the Public Gallery]
Dilihat gagal.
….. the most …..
Not right, the Negeri Sembilan answer, not right.
….. the entire world of politics was astonished at how, in the end, the one who lost became Prime Minister.
Because he says it failed.
….. cannot accept defeat …..
Entered through the back door.
….. why it failed.
….. anti-party-hopping.
Okay …..
Cannot accept defeat.
We let the disappointed people speak.
Diamlah.
….. wait for 5 years, give Pakatan Harapan the opportunity to prove our capability. Why do you …..
Ask Pakatan itself. Don't ask us.
Jeram Padang, back door, back door.
….. committed betrayal …..
Everyone, I am telling you, the Speaker is right in front here, yes …..
….. in the end you caused …..
Please ask for permission if you want to speak.
….. the people lost to protests, to the democratic process.
Because a manifesto is not a holy book.
Enough, enough, enough.
Tolong duduk.
Because UMNO accepts traitors.
Not that they do not believe in democracy …..
….. party-hopping.
….. Do not believe in Pakatan Harapan …..
Whoever is speaking without the Speaker's permission …..
…. back door, all of you sit down.
From now on, whoever speaks, I will order to leave. 1, 2, 3, whoever speaks without asking my permission, I will order out. [commotion subsides]
Dato’ Speaker, I seek permission briefly, Dato’ Speaker.
Chembong keluar.
Keluar, keluar.
Mintak kebenaran.
I seek permission.
Chembong keluar.
Only that, nothing else is allowed, what is the question?
Repah, why did you say such things that condemn UMNO? Dato Speaker.
Okay, that's enough. Sit, sit.
So also regarding the Melaka State Election, I want to ask the Honourable …..
Repah, Repah, no, sit.
….. the opposition, yes …..
Repah keluar.
….. Honourable Member from the opposition, do not read only one layer. Read two layers of the Melaka State Election, yes, why, because its director is the Honourable Rantau. If we look at the list of candidates put forward by UMNO Barisan Nasional, most are new candidates who have never contested or have only just contested one term. So its signal for the 15th General Election (PRU Ke-15), those who have 3 terms, those who have 2 terms, wait, perhaps there will be new candidates, yes.
Ini kalilah.
Ha, that's it, read two layers, yes. Read two layers. That's why, don't jack up too much.
Dato’ Yang Dipertua,
People say …..
Dato’ Yang Dipertua.
….. if you want to jack up. Sit, sit, sit.
Dato’ Yang Dipertua.
I do not permit it. I do not permit it.
May I …..
Soalan.
….. ask for permission.
I will only allow a question.
Soalan.
I do not permit it.
Soalan saja.
Soalan saja.
Apa soalan?
Palong, sit down Palong.
My question is, is the title of this winding-up speech now analysing the Melaka State Election?
Okay, duduk.
Yesterday was allowed, today it is not allowed, ha.
Answer, answer, answer.
Okay, continue Paroi.
So that is why, yes, if we want to praise, to jack up our leaders, don't jack them up like we jack up cars, yes. If we jack it up, jack up the car, the flat tyre is jacked until the car is replaced. Don't jack it up until the car overturns and we are crushed, yes. Be careful, yes. And I also hope that the Honourable Rantau will agree to the Bill, we have limited the term of Yang Amat, the Honourable Menteri Besar, to only 2 terms. That is the Bill that will be tabled, I hope the Honourable Rantau, he has proven in the Melaka State Election that he appointed new faces, so that is how I hope we can limit the term of this Honourable Menteri Besar to only 2 terms. Let us give the opportunity to the Honourable or other candidates.
Finally, to my friends in PAS and BERSATU, I want to remind them to be friends in moderation, because one day a friend will become an enemy. And be enemies in moderation too, because when enmity is over something, one day, one day the enemy will become a friend …..
Chembong, sit down Chembong.
….. that's how …..
….. do not disturb.
And I also want to remind everyone that when we were the opposition before, the Honourable Rantau ……
A question, Dato’ Speaker, a question, a question.
Soalan.
I want to ask Paroi, is PAN now an enemy of PAS?
What, the previous question?
Just now about being friends, before friends, now what, is PAN also an enemy of PAS? About friends just now, my question, answer, please answer.
Don't be long, a question.
PAN, I do not know PAN, I only know Amanah.
Yes, okay, that is an answer. He has answered, okay. Okay. There is ….
I want …..
…. only 2 minutes.
….. last, Honourable …..
Terakhir, okay.
…. Dato’ Yang Dipertua. In connection with when we were the opposition, the Honourable Rantau often says, yes, before, when you were about to, during elections, you offered yourselves, yes, to become representatives of the people. So when you have won, do the work …..
ADUN, ADUN Paroi. Excuse me, excuse me a little, one. ADUN Paroi just now told the voters that the percentage that came out in Melaka was low. But another thing I want to add, billions came out from over there. Thank you.
Money politics, yes, ha, I don't have evidence for that yet. Just look at TikTok. So, I want to say to the Honourable Members from the opposition, yes, when you have become representatives of the people, do the work. Like YB Jeram Padang. He said there are, there are, there are people in his area, yes, who could not fill in the forms, who did not know that JKM had made changes and so on, go down to the ground, meet them, help them fill in the forms. Surely even that a representative cannot do …..
ADUN Jeram Padang, please open the office.
…. what must be done. The flood problem, ADUN Chembong said flood. You must go down to the ground, yes, because …..
Aaa.
Soalan.
….. when there is flood we must act quickly …..
I will only allow a question.
I heard my name.
Just a question, clarification, a question.
Ya.
Just a question. What is the question?
Soalan saja.
There is no question, sit.
Actually, no, this is about the JKM matter.
His question …..
Soalan, soalan.
….. I bring up the issue …..
Soalan, soalan.
….. I bring up an issue in this House, it is my duty, my responsibility …..
A question. Now it is his floor. I am only giving a question.
So does the Honourable Paroi not understand that? That is my question. Ha, answer then.
Okay, sit, sit.
I want to teach, I want to teach Jeram Padang, yes, so as to raise our level as representatives of the people. This State Legislative Assembly (DUN) is the place for us to determine the State Government's policies and directions, yes. If it relates to …..
Not a party ceramah.
Dato’ Yang Dipertua …..
Duduk, duduk.
….. local authority (PBT), in relation to matters that …..
Soalan, soalan.
I do not allow it, sit. It is nearly over now.
….. government departments ….
Soalan.
Another question, later you will disturb.
….. go and meet the government departments …..
Another 2 minutes left.
….. they are ready to fully open the door to receive you gentlemen, to attend and discuss. This is what I do. The flood incident in the Paroi State Constituency, we have a flood incident in Bandar Seremban Selatan, a flood incident in Taman Seri Pagi. Several times I met Seremban City Council officials, dozens of times. It is not that I met once and immediately got a project. No, yes. We met many times, discussed, went down to the ground. Finally, alhamdulillah, the project was carried out, implemented and, alhamdulillah, the flooding is increasingly under control in the Paroi State Constituency area. So we must, we must go down to the ground and meet them. Let us not belittle them. We, I want to prove that they have done their best. Jelebu District Council won 3rd place in the Sustainable City award in 2021. Congratulations to its DO, Yang Berbahagia Tuan Abdul Rahim bin Abdul Aziz, who came 3rd in all of Malaysia. Out of nearly 100 District Councils …..
A question, a question. Several Honourable Members: Sit.
Soalan, soalan.
The second …..
A question, Dato’ Yang Dipertua.
Enough, enough, enough, wind it up now. Enough, enough, enough.
….. Kuala Pilah District …..
Soalan.
Enough, enough, enough. He wants to wind up now.
….. Kuala Pilah District …..
I want to ask.
….. 2nd place …..
Enough, enough, enough. He is winding up. Enough, enough, that's enough. He wants to wind up now.
Kuala Pilah District came 2nd in 2020 for the Sustainable City award. Negeri Sembilan received the award 2 years in a row. Isn't this the hard work of our officers? Surely it is their hard work, we must appreciate it. Seremban City Council won the Happiest City award. That is why the ADUN for Seri Menanti can take two wives, because Seremban City Council is the Happiest City.
Ouch, disturbing. Okay, don't disturb.
On World Happiness Day in 2020. Isn't this the hard work of them? The hard work of our government officers. We give a round of applause to …..
Okay, Paroi, is there more? So that is it, Yang Berhormat Dato’ Speaker, I apologise if there was, just now the House was empty, so I want to pull …..
After this I want to, I want to, I want to invite Paroi to, what, have lunch.
Who is speaking, Sungai Lui.
I want to pull them in …..
I said earlier, whoever wants to speak must first ask the Speaker's permission.
….. rather than sitting outside, it is better to sit inside this House, so that is why I had to be a bit harsh, I apologise. If anyone felt hurt. So that is all, thank you Dato’ Yang Dipertua. That concludes, wabillahitaufik walhidayah, assalamualaikum WBT.
Waalaikumsalam WBT. So actually I celebrate with everyone. Wait. I celebrate with everyone. You gentlemen speak of defeat, I accept how many ADUNs from wherever, spoke about congratulations, our defeat in Melaka, I did not disturb, you gentlemen
are happy, that's fine. But when our friend wants to wind up, listen. Please, Honourable Lukut.
Thank you, Mr Speaker, for giving me the opportunity to make my winding-up speech. With your permission, Mr Speaker, I will remove my facemask because the House is hot just now. I need to cool down, okay. Greetings of peace and unity, and greetings from ERAT Negeri Sembilan.
The Negeri Sembilan State Government welcomes the proposal and views of the Honourable Chennah, which is to open a new chapter in politics in Negeri sembil, Negeri Sembilan. She mentioned the formation of a mature political culture that meets the aspirations and inspiration of the people. I agree, I agree with her that leaders must compete in terms of the ideology and struggle of their respective parties in a harmonious and civilised manner. Politics should not merely incite, slander, rage or abuse. Instead, in politics, we must compete in offering the best services to the people, compete in offering improvements to government policies, and compete in changing government policies for the sake of our people.
Mr Speaker, a mature and quality political culture must be nurtured among all levels of society, especially since community leaders must show te, an example to our society. Together, together in this honourable House, we debate the proposals and problems of the people professionally so that they can be improved and resolved.
Mr Speaker, the stability and authority, the authority of any government, whether the Federal Government or the State Government, must be defended by all of us. This is the main key to maintaining economic stability and attracting investment from abroad or within the country. This will contribute to the development of the state and, ultimately, the livelihood of the people will be guaranteed. Congratulations and well done to all State Assemblymen (ADUN) in Negeri Sembilan for showing maturity and wisdom in preventing Negeri Sembilan from falling into the political chaos that occurred last year, as in other states. I would like to give credit to all Negeri Sembilan ADUN because the people's mandate and the people's trust in the last General Election (PRU) could be maintained, and every vote cast by the people of Negeri Sembilan could be respected. I give credit to everyone for this, okay.
Mr Speaker, for the information of this honourable House, the State Government together with the civil servants will try their best to ensure that the harmony and unity of the various races here, in Negeri Sembilan, are in the best condition. Based on our observation, social media that is expanding today contains much information that can be shared. Indeed, individuals can give comments and opinions, their personal opinions, openly on social media platforms today. As EXCO in charge of unity in the state, it is my responsibility to appeal to all social media users that, before posting any news or pal, or their views, they must check the authenticity or source of the news. Social media users must be responsible for any facts and views they post on social media. Never attempt to utter words that incite, slander or make unfounded statements. This will incur legal liability.
The Negeri Sembilan State Government will not tolerate any elements of slander or threats that attempt to disrupt or interfere with the unity of the people of Negeri Sembilan. We will also ensure close cooperation between the State Government and law enforcement agencies such as the Royal Malaysia Police (PDRM) and the Malaysian Communications and Multimedia Commission (MCMC), so that any party that attempts to raise or trigger racial issues that may threaten or undermine, threaten, undermine the unity of the people of Negeri Sembilan will be subject to appropriate legal action. I believe and am confident that law enforcement agencies are able to carry out their responsibilities, their responsibilities, fairly and impartially according to their professional fields. The State Government is very firm on this matter and, in order to ensure, ensure that the harmony and unity of society can be guaranteed. That concludes my speech, thank you, Mr Speaker.
Thank you, Honourable Lukut. Thank you to all State Assemblymen, indeed they are all good, yes. Negeri Sembilan is not like other states, yes. There is no hopping around, there is no one looking, looking for a chance to hop. So congratulations to all of you. Thank you. I will continue to the next speaker.
Thank you, Mr Speaker. First of all, I would like to extend a thousand thanks to the Honourable Members who took part in the debate session. And thank you to all the Honourable Members who touched on the portfolio of Urban Wellbeing, Housing, Local Government and also Kampung Baru.
Mr Speaker, to answer, so, to answer the issue raised by Honourable Seremban Jaya regarding rubbish in the Seremban Jaya area. The issue of rubbish dumping in the Seremban Jaya area has been given serious attention by the Solid Waste Management and Public Cleansing Corporation (SWCorp) of Negeri Sembilan. A site visit was held on 12 October 2021 together with the Seremban City Council and the Local Government Division, State Secretary's Office (Pejabat SUK) to find solutions, especially cleaning and enforcement work as well as the status of the location. So, for the information of Honourable Seremban Jaya, the issue of this rubbish is indeed being acted upon, it is indeed being acted upon. And action has been taken. So, that is regarding the rubbish issue.
And secondly, regarding the issue of traffic lights at Persiaran Forest Heights to the junction of SJKC Ulu Kanchong. Honourable Seremban Jaya asked about the latest status. For the information of Seremban Jaya, for long-term planning, for long-term planning, the Seremban City Council administration will require the developer Sunrise MCL Land to install traffic lights at this junction during the upcoming development, near the said junction, namely on lots 63547, 63655, 63656 or 65965.
Regarding the damage to traffic lights in Seremban Jaya, such as at the Tesco entrance junction and others, the Council, in its planning, has applied for MARRIS allocation for 2022 for the comprehensive repair of the traffic light system and traffic light components with an estimated cost of 300 thousand. So, Honourable Seremban Jaya, this is also being acted upon by the Seremban City Council.
Next, regarding the need to build a sports centre and a special sports hall. I think Honourable Paroi has already answered earlier.
Next, for Honourable Jeram Padang, yes, Honourable Jeram Padang stated that a resident was issued a compound of 1,000.00 ringgit. So, in this matter, for the information of Honourable Jeram Padang, the State Government currently has no plans to gazette any place for the purpose of providing a shelter for stray dogs in Bahau, as there is no suitable area for this purpose. The compound for the offence of allowing dogs to roam is subject to the Jempol Municipal Council By-Laws. However, as Honourable Jeram Padang has already stated, the compound rate may possibly be too high, so we recommend that Honourable Jeram Padang help the resident to make an appeal.
And we will try to help. Most importantly, I think we must continue to educate the public so that they ensure their livestock do not cause any nuisance or disturbance.
The next matter concerns Affordable Housing (Rumah Mampu Milik). I think I already answered on Rumah Mampu Milik yesterday. I think Honourable Jeram Padang has also been informed about the Rumah Mampu Milik issue that Honourable Jeram Padang proposed we build in the Rompin area.
Next, for Honourable Chuah. Honourable Chuah has already stated that there is no Fire Station or covered morning market in the area. And she requested that the State Government apply to the Ministry of Housing and Local Government (KPKT) to provide these facilities as soon as possible. So, for the information of Honourable Chuah, for the construction of a Fire Station in the Chuah State Constituency, the Fire and Rescue Department (Bomba) is in the process of looking for a suitable land site for the construction of a Fire Station in the Bukit Pelanduk area, or, or a new Fire Station in the Lukut area, which has been examined, and Bomba has applied to be included in the Twelfth Malaysia Plan. Apart from that, the Sepang Fire and Rescue Station is a fire station near the Chuah area, and the response time is under 10 minutes if there are any emergency cases such as fire or rescue.
As for the covered morning market. KPKT has already prepared a Pasar Sejahtera Guideline through design guidelines on safety aspects that are uniform for all markets in local authority (PBT) areas throughout Malaysia. These guidelines have been adopted by the Government Council (MMK) on 7 April 2021. However, the morning market is temporary in nature, where its site is also used as vehicle parking. Given that market traders are categorised as mobile hawkers, the construction of a covered morning market or a permanent structure is found to be less suitable. And next, Honourable Chuah also touched on the Special Area Plan (RKK) of Port Dickson. She asked whether the RKK provides a route, a railway, Seremban – Port Dickson, and whether it will be implemented. For the information of Honourable Chuah, the Seremban – PD railway line has been included in the Port Dickson Special Area Plan (RKK). It has great potential to be implemented to further encourage the tourism industry and as a main gateway via railway to Port Dickson. It is subject to a feasibility study, with permission, which will be carried out to enable the road connection via railway to Port Dickson to be made.
And next, Honourable Chuah also touched on rubbish along the Lukut – Sepang road. For the information of Honourable Chuah, the Lukut – Sepang road is a Federal Road and is maintained by the Public Works Department. The schedule for grass cutting is carried out monthly by the maintenance contractor Selia Selenggara. When, when grass cutting is carried out, rubbish collection will also be carried out by the maintenance contractor Selia Selenggara.
Mr Speaker, next, regarding the issue raised by Honourable Gemas concerning the status of Affordable Housing Type A at Taman Sahabat Gemas. Is Honourable Gemas here? Yes? Okay. For the information of the Honourable Member, the Negeri Sembilan Housing Policy has set the condition that developers must build Type A housing amounting to 45% of the development on the site before the list of buyers is handed over to the developer. If the list of names is handed over early to the developer when the progress on site is less than 45%, then the probability of the project being abandoned is high and the State Government would need to be prepared to become the rescuer. Once the developer has fulfilled that condition, the State Government will hold a balloting ceremony and will hand over the list of successful balloted names to the developer, the developer. For the information of Honourable Gemas, the Housing Division will contact the developer and we will listen, and we will also see how we can find a win-win solution to ensure that the Affordable Housing Type A can continue to be developed in that area. Because in my view, it is not easy for the government to get developers whose projects only build Type A houses. So the State Government will try to facilitate.
Mr Speaker, I want to ask. If for …..
Ya, silakan.
It is understood that, for the list of this housing, the names have been submitted and have been opened and the balloting has been conducted in the near future. And in this sitting of the honourable House, the reply from Bahau also stated that it is under the State Government's screening. So, I have no problem with the list of names. And if we look at the number of applicants, if I am not mistaken, there are nearly 400 applications. So what is the harm in the State Government, at the initial stage, discussing with the developer the process of quickly releasing those names. Now it has been many years. And coincidentally, the developer has built housing before this, for Type B and Type C and so on. They built those first, built those first. But for Type A only, they did not build first in that area. So what is the harm in a good discussion, by consensus, to see together. And, how, if possible, the government could help a little or give a little injection to the developer, or how, to ensure that the prices do not soar while the community needs it, given the increase in the price of goods and so on. And that is my question.
Okay, thank you for the proposal of Honourable Gemas. That is why we will negotiate with the developer. I think one of the principles that we need to hold together is …..
What is the price of the house? What is the price of that house?
80 thousand. Okay, for the information of Honourable Gemas, I think one of the principles that we need to hold together is that we need to protect the interests of buyers. I think the main reason we require the development percentage to be at least at the level of 45% is that we want to ensure the project can continue, because if we allow him to obtain the list first, and only after that start development, there is a possibility or probability of it being abandoned. And if, if unfortunately, the project is abandoned, it is the buyers who will be affected. I think we must protect the rights of those buyers together. So in this matter, we will negotiate with the developer and find a way, see how we can facilitate. I think that is all regarding the housing issue.
And Honourable Gemas also touched on the efforts to revive the Gemas Public Market. For the information of Honourable Gemas, to improve the existing condition, repair works costing 100 thousand are currently being carried out and are expected to be completed in December this year. At present, there are 23 stalls and 7 shop lots at the Gemas Public Market. Only 3 stalls are rented, while 7 shop lots have no tenants. The existing tenants' contracts will end on 31 December. For the time being, the Tampin District Council is still open to any applicants to trade at the Gemas Public Market. If, until the end of this year, there is still no response from interested traders, the Tampin District Council plans to make an RFP (Request for Proposal), with permission. The RFP can only be made after the rental period for existing tenants ends. The Tampin Council, the Tampin District Council, is ready to hear proposals from all parties to revive the Gemas Public Market.
Next, to answer the question raised by Honourable Rantau during his debate. This concerns the status of the handover of keys for the PPR Rantau houses, which has not yet been resolved. For the information of this honourable House, although Honourable Rantau is not present today, I think this matter, I think this matter is, the State Government has a responsibility to answer to all Honourable Members. For the information of this honourable House, the delay in handing over the keys for the PPR Rantau houses is due to the transfer of management and administration of PPR Rantau from KPKT to the State Government. KPKT was not, was not able to manage PPR Rantau through the rent-to-own method or hire-purchase, and intends to hand over, entirely, the management of the occupation of PPR Rantau to the State Government. The State Government has agreed to purchase this PPR Rantau scheme from the federal, the Federal Government at an offer price of 3.5 million ringgit, and the Negeri Sembilan State Development Corporation was appointed to manage PPR Rantau. KPKT is currently taking action to prepare a Proposal Paper on the Management and Occupation of the Rantau People's Housing Project to be brought to the, to the Cabinet Meeting, to the Cabinet Meeting (MJM). KPKT will hand over the keys to the State Government as soon as the decision of the Cabinet Meeting is obtained. Subsequently, the handover of keys will be carried out by the State Government to the house owners.
Mr Speaker, in the issue of PPR Rantau, in fact the efforts that have been implemented by the State Government are to protect the fate of the buyers. Because if we follow the system proposed by KPKT, those buyers would only be able to become tenants. They would have to rent, they, at the end they would not get that house. That is why the State Government decided to purchase the project and we follow the old concept. We use the rent-to-own method to ensure these buyers will become owners of the house after 25 years, after they have settled all payments to the government. So that is one of the efforts that has been carried out by the State Government to protect their interests. Although there appears to be some delay, I think becoming an owner is better than merely becoming a tenant. Mr Speaker …..
Dato' Dipertua, may I interject briefly?
Ya, sila.
What I want to ask Honourable Bahau is, has this PPR programme been terminated? And what is the status of the construction of PPR houses near Tanah Merah in Port Dickson, in the Port Dickson Parliamentary constituency? Thank you.
I think the PPR land at Tanah Merah is still going ahead. And I would like to state this once again. The State Government has already made efforts to purchase the PPR project at Rantau, but it is still subject to the decision of the Cabinet at the Federal level. So, we are still waiting. I have already brought this matter to the Honourable Minister of KPKT. So, I hope this matter can be resolved.
And for the information of the Honourable Jeram Padang, this is the Projek Perumahan Rakyat. Originally, it was a rent-to-own concept. So, for those who have already succeeded in the balloting, they will receive the house, and each month they pay about 140.00 ringgit, so they pay for 25 years, and the house will become theirs. But the new concept is that, from KPKT, it is only a rental. So in this matter, that is the reason why the State Government decided to take over the project. And we rent it and then sell the houses to the buyers.
Next, Mr Speaker, regarding the issue that has already been raised by the Honourable Temiang concerning the business licence application process taking too long to approve applications. For the information of the Honourable Temiang, at present the State Government has not appointed any party as an intermediary to represent the local authority (PBT) in business licence applications. Every application must be dealt with directly with the PBT for the purpose of the business licence application according to the application procedures that have already been determined.
Next, regarding the lack of lighting between Temiang and the newly built Pekan Pantai road. For the information of the Honourable Temiang, the connecting road from the Kajang – Seremban Highway to Jalan Pantai is 10.3 kilometres in length, where from the sim, the LEKAS/Temiang interchange (KM0) up to KM3, was built by the developer Lapangan Kota Sdn. Bhd. with a 2-lane, 2-way road facility as well as street lights. Repair works for the damaged street lights were completed in October this year, and they have been functioning well. As for the extension from KM3 to KM10.3, this road was built by the JKR with a 2-lane, 2-way road facility. Only part of this 6-kilometre stretch is fitted with street lights.
Next, this …..
Mr Speaker, may I interject? Honourable …..
Yes, please, please.
…. EXCO Bahau. Regarding the licence application, I want to ask what improvements will be made so that applicants do not have to wait long, and so that they are informed in writing of what, what the status of their applications is. Secondly, just now the answer said the lights are on. I ask MBS to come down to the field. Not at all lit from the LEKAS Highway, the access road into this, the Temiang area, not lit at all. The entrance road is not lit either. The exit from Temiang to Mantin is not lit either.
Okay, Honourable Temiang …..
Mr Speaker, my question is the same. I am certain because this area is indeed my area, it really is not lit. Thank you. The light, the light is not on.
Okay, thank you, Honourable Temiang and also Honourable Lobak. Now, regarding the issue of licence applications, if there are delays or any issues related to licensing, I think the applicant can submit an appeal to the City Council. And secondly, regarding the junctions mentioned by the Honourable Temiang and also Lobak, the lights are not on, I request MBS and also the relevant department to examine what has been raised by the Honourable Temiang.
Honourable Mambau, the problem of overgrown bushes, hah, on the abandoned lot. I think this matter has already been answered during the question and answer session this morning.
Honourable Mambau also touched on the status of the Desa Rasah flats, Seremban. For the information of the Honourable Mambau, the State Government through the Seremban City Council (MBS) constantly monitors strata schemes within its powers under the Strata Development Act 2013 (Act 757), including the Rumah Pangsa Taman Desa Rasah and the Rumah Pangsa Desa Rasah, which were completed on 13 August 1984. Based on the COF date, monitoring by the COB Unit only began in 2007. From the very beginning of monitoring, COB found that these flats were indeed neglected and in a dilapidated condition, as nearly 70% of the units were unoccupied and damaged, and in addition the management committee was inactive. The management corporation was successfully established at the first annual general meeting on 3 November 2013. However, until now the management corporation has not been able to function properly because there is no cooperation from the parcel owners. So, nevertheless, there have been several rounds of discussion between COB and the MC to hold a walkabout session to meet the owners, but this could not proceed due to the Movement Control Order. Therefore, the plan will proceed once a suitable date and time has been obtained among the MC committee members.
The Honourable Chembong has written about, hah, the issue of stray dog problems to the Rembau District Council, where the Rembau District Council faces problems of space and problems of storage period as well as the capacity to provide the necessary care for these animals, and the Honourable Member hopes that this situation can be given attention. For the information of the Honourable Chembong, at present MDR is not yet a, not yet able to provide a shelter for stray dogs due to financial and manpower constraints. To control nuisances related to stray dogs, MDR appointed a registered contractor to catch and manage stray dogs in June 2021 and carried out several rounds of joint enforcement. However, in August this year, the contractor withdrew and is no longer interested in continuing the cooperation. MDR is always striving to obtain a contractor to assist and resolve complaints about dog nuisances.
To answer the issue raised by the Honourable Chennah Berkat, regarding electric car charging stations. The State Government through the Local Government Division will study the suitability of requiring, in the Planning Permission, the provision of parking bays for charging stations to provide facilities for electric vehicle owners. At present, no cooperation has been made with the private sector. Now …..
Mr Speaker, let me interject briefly. Thank you for the explanation from the Honourable Bahau. What I suggest is not only for new projects. It is true that I think when a project applies for Planning Permission, this aspect should also be given attention because I think this is a necessity for the future. This is for new development projects.
But for the present, I think that for public car parks or in areas owned by the local government authority, efforts can also be made to provide bays for charging electric cars. And as I have said, there are many private companies that wish to cooperate with the PBT without incurring costs or financial implications for the government. This will be borne by the private sector. Only there must be a clear guideline from the State Government so that the PBT can cooperate with the private sector, sya. Thank you.
Thank you for the suggestion and also to the Honourable Member from Chennah. We have taken note. And we will try to implement it, and it is very likely that we will start at the Seremban City Council level.
Next, to answer the issue that has already been raised by the Honourable Senaling regarding complaints from hawkers who say that they are not on the list for selection to be placed at the hawker relocation centre. Honourable Senaling, this one, Honourable Senaling refers to, referring to, hawkers in Kuala Pilah or at the City Council?
In Taman Ampangan.
Di Ampangan?
Ya.
Okay. For the information of the Honourable Senaling, there are 3 hawker relocation centre locations built in Kuala Pilah, namely at Taman Kuala Pilah Perdana, Pekan Juasseh and Melang, through allocations from the State Government totalling 600 thousand and from the Ministry of Housing and Local Government (KPKT) totalling 500 thousand for the year 2021. The project details are as follows, this detail I will send to the Honourable Senaling later.
Regarding the City Council, wait a moment, this one is indeed for the Honourable Member, what was raised by the Honourable Senaling. This is the answer from the Seremban City Council, the list of hawker candidates has been identified through joint discussion between MBS, the representative's office and the association representing local hawkers. The discussion was held on 14 July 2021. Any enquiries regarding the candidate list or matters related to the relocation of hawkers may be directed straight to the MBS Cleansing and Environmental Health Department, which is responsible for the relocation of hawkers in Seremban. I think that is all from me. Thank you.
Mr Speaker, Honourable Bahau. My question has not been answered yet, that is the culvert and drainage system at Kampung Baru Rahang. It is a major problem.
Never mind, Honourable Seremban Jaya, perhaps later I will answer in some way, in writing. Thank you.
Okay, thank you.
Dato’, sorry Dato', I apologise. There is one that perhaps was overlooked. Regarding the development of Seremban Utara. Where I want to ask the State Government whether it has received all this, the development of 10 development blocks from the land developer or their plan, so that, as I want to implement, the basic facilities for residents must, be ensured to be present, and not allow the developer to build as they please.
Thank you, Honourable Temiang. Regarding the development of Seremban Utara, this one I will answer in writing later, to the Honourable Member. Thank you.
Thank you, Honourable Bahau, for answering all the questions raised by the Honourable Member in this House. Next, I would like to invite the EXCO members. Nilai, please go ahead.
Okay, there are only a few issues relating to the Honourable Kota, relating to the application from the Legong Jaya Temple. So I have received the application and it has already been processed, the financial aid will be disbursed in the near future through the Negeri Sembilan Non-Islamic Affairs Trust Fund.
Secondly, relating to the Honourable Chuah concerning the provision of non-Muslim burial sites and development approval. PLANMalaysia@Negeri Sembilan has prepared the guidelines, the Negeri Sembilan Planning Guidelines and Standards Manual Version 1.0, which was approved by the State Government Executive Council on 23 April 2012, 2021, and its application took effect on 1 July 2021. In that manual there are guidelines for burial facilities for Muslims and non-Muslims as a reference and guide for PBTs in providing burial facilities in a development area. Based on these Burial Facility Guidelines, the requirement to provide burial sites within a development is subject to
a population of 5,000 people, with the division of burial sites based on 70% Muslim burial sites and 30% non-Muslim burial sites. However, the determination of burial sites for non-Muslims is subject to the Negeri Sembilan Non-Islamic Affairs Committee Meeting.
Next, regarding assistance to beautify the Chinese cemetery at Jalan Lee Sam. This cemetery is on reserve land under the supervision of the Wah Chai Seremban Association and is not under the supervision of the Seremban City Council (MBS). Therefore, maintenance or beautification works cannot be carried out using the Seremban City Council's allocation. And it is suggested that the Wah Chai Seremban Association, as the owner of this cemetery, seek other methods or allocations to carry out maintenance and beautification works. Previously, allocations through the Non-Islamic Affairs Trust Fund have also assisted and will be assisted as needed and as capable by us.
Next is regarding the ADUN Chuah, the Honourable Chuah …..
Mr Speaker, a question. I want to ask, if this community can, may I request the Cemetery Trust Fund? The Cemetery Trust Fund.
We do not have any cemetery trust fund.
[off-mic conversation] ….. a cemetery trust fund channel at MBS. I have just been informed that there are millions of ringgit in the Cemetery Trust Fund. I hope the PH Government will consider and review whether the money in the Cemetery Trust Fund can be used in full. Thank you.
For the information of the Honourable Lobak, there is indeed a fund, hah, at the Seremban City Council. That is under the cemetery portfolio, but usually it is used for land acquisition or the provision of new burial sites, where that allocation can be used for providing infrastructure for new burial sites. For example, at Sendayan, the Christian burial site has already been prepared with road facilities and all the basic facilities at a cost of nearly 700 thousand. So that is the cost for providing the facilities of new burial sites. And …..
[off-mic conversation] ….. to be taken care of. Although it is new, the old one, Lee Sam, is right in the middle of the, the city. So I humbly ask the government, with its kind grace, to channel donations to help maintain the Lee Sam graveyard in Pekan Seremban. This …..
Okay, we …..
….. needs to be reviewed again. Thank you.
Okay, we will try through the Non-Islamic Affairs Trust Fund for the cemetery at Jalan Lee Sam. As we know, Jalan Lee Sam is already full. There is no other place that can be used as a new one. What is important for us now is the provision of new sites to accommodate or to resolve the issues of insufficient non-Muslim burial sites, especially in the Seremban District and the Port Dickson District. Okay, next …..
Sorry, I apologise, or I beg, because this is indeed a city, a city, already upgraded, I humbly request, with your permission, please help. Thank you.
Okay, thank you. Next is also relating to the Honourable Chuah, that is the cemetery issue in Seremban and in Port Dickson. The State Government is identifying several sites and areas to be made into non-Muslim burial sites according to the needs of the areas, in the Seremban District and also in Port Dickson.
Next, from the Honourable Chuah as well. Regarding burial sites, the Indian cemetery at Bukit Pelandok that has encroached on private land. A check by the Port Dickson District and Land Office found that the Indian cemetery at Bukit Pelandok, located on Lot 1521, which is the existing burial reserve, has encroached on part of the land of Lot 20240 and Lot 20241, an area of approximately 2,767 square metres. A pre-calculation plan for all three lots has been prepared for further action. Thank you.
Honourable Members, I think it is almost 1:00 pm. A few minutes more, yes, 5 minutes. So I propose to adjourn first, and we will resume at 2:30. Please make sure everyone is present at 2:30, for, the winding-up. So that is all, thank you. See you at 2:30.
[The House was adjourned at 12:55 pm]
[The House resumed at 2:40 pm]
[The Honourable ADUN Chennah and the Honourable ADUN Serting were absent from the afternoon session]
Bismillahirrahmanirrahim, Assalamualaikum WBT. Honourable Members, we resume the winding-up and the reply from the government side. Please proceed.
Dato' Yang Dipertua, may I have permission to remove my face mask. Dato' Yang Dipertua and this honourable House, in conjunction with the budget tabled by the Honourable Menteri Besar under the theme "mendaya upaya ekonomi rakyat". I am pleased to wind up this debate today by emphasising several aspects that clearly show the commitment of the Negeri Sembilan Pakatan Harapan Government in the women, family and welfare sectors, which are the core of building a clean, consensual and prosperous society in line with the aspirations of the Negeri Sembilan Pakatan Harapan Government.
Dato' Yang Dipertua, through the 2022 budget, the Negeri Sembilan Pakatan Harapan Government has provided a wide range of allocations, whether for women, persons with disabilities (OKU), the homeless, schoolchildren or other affected groups, which are highly inclusive and cross the boundaries of race, religion and geography.
Dato' Yang Pertua, before I continue, allow me to share a pantun so that we can all make this honourable House a dignified place that practises mature politics, as suggested by the Honourable Member for Chennah.
Sungguh sedap buah berangan Buah masak dengan sekata Dalam politik amalkan kematangan Demi rakyat yang tercinta
Dato' Yang Dipertua, among the initiatives announced by the Honourable Menteri Besar that assist women, families, welfare and the community are C4U, B4U and Rumah Minda Ceria. Notice this, it is a fan, if it is hot you can use it [referring to the budget pamphlet which is shaped like a fan]. I, here, extend my congratulations and commendations to the Honourable Menteri Besar, members of the State Executive Council (MMK), Dato' SS, the Honourable Financial Officer, the Honourable Legal Adviser and all civil servants who have together made this budget tabling a success.
Dato' Yang Dipertua, I would also like to record my congratulations and commendations to all members of the Department of Social Welfare (JKM), who serve with full dedication, integrity and sincerity. The members of JKM are the front line, or, with your permission, front liners, who serve the people when the government receives reports or complaints regarding the needs of the target groups, especially on welfare matters.
Dato' Yang Dipertua, the issues frequently raised by several elected representatives and also the opposition concern the review or renewal process and the termination of JKM assistance. And I will allow myself to provide some clarification. Regarding the review, applications are usually made through Form 18. After approval, three months before the JKM, what is it, the expiry date of JKM, which is one year from the date of receipt. For example, if you received JKM assistance on 1 January, then three months before 1 January, a review form will be sent by post and the recipient must complete the form, and an appointment will be fixed by the JKM Office for an investigation.
However, during the MCO period, there was an improvement, since it is not compulsory, there is an exemption from the review process which is effective, effective from 1 January 2021 until a date to be announced later. This means that for any recipient who does not fill in the review form, no termination of JKM assistance will take place. Effective from 1 January until 2021. If there are any complaints that there has been a termination, please forward them to me. Another improvement that I, as EXCO for Welfare, have made is that I have made it mandatory to give a 21-day notice to all ADUN of the constituencies before any JKM termination is made. This takes effect from 22 January 2020.
Normally, termination of assistance before the enforcement of the MCO, where there is no termination, is, for example, ber, relocation. A recipient who has moved, it is, it is mandatory for the recipient to inform JKM that he or she will move. For example, if suddenly, without, it cannot be controlled, he or she has to move to another state, then just a notice or a phone call to JKM, and the assistance will be continued by the relevant state. But the recipient must make a fresh application in the new state. The problem occurs when recipients move without informing JKM. I hope this matter can be coordinated
and conveyed to all the relevant parties so that this does not happen again.
Upon death, termination will take place. If income exceeds the PGK (Poverty Line Income), termination will take place. If they cannot be contacted, then the latest instruction, that 21-day notice, I hope can be well received by all ADUN of the constituencies so that they help us to find the person, because sometimes we go through the usual processes such as letters, or phone calls, or we go to the house and cannot find them. We try through MPKK, through KRT, still cannot find them. So we have a need to terminate the assistance. But before terminating the assistance, we will issue a 21-day notice to all ADUN of the constituencies. But I understand that the letter reaches the ADUN of the constituency, their respective ADUN offices, rather late. So I will make another improvement where it will be 21 days from the date of receipt of the letter, okay.
Ineligible because they have exceeded the age of 18 years or have changed the assistance scheme. Sometimes they receive one scheme, perhaps OKU. After that, we feel it is more suitable to transfer them to the senior citizens scheme because the senior citizens scheme is higher, so that is counted as a termination too.
Apart from that, this shows that the Negeri Sembilan Pakatan Harapan Government is indeed caring and adopts an open approach. And we will correct what is usual, make the right things usual, by launching new initiatives, in which, I repeat, there is a notice of information. Dato' Yang Dipertua, it is hoped that this positive step, I repeat once more, can be well received by the members of this honourable House and be met with the feedback required by JKM for follow-up action.
Regarding, ha, this, the matter just now has already answered the questions of the ADUN for Jeram Padang and the ADUN for Serting.
To answer the question from Temiang, regarding C4U. According to the eKasih data updated until 30 November 2021, there is a total of 5,302 single mothers. However, this list is quite dynamic because some have passed away, some have remarried, some have exceeded the poverty line, so it is not true that the same 5,000 people receive this assistance every year.
The C4U (Care For You) Single Mothers assistance of Negeri Sembilan is one of the election promises of Pakatan Harapan for the 14th General Election (PRU Ke-14). Of the 71 promises, 6 promises are under my portfolio and C4U is one of those promises.
And apart from us giving RM200, some may say it is too little, but the goal for us, our wish, is to set up a portal where we have a list of single mothers so that we can help them in other ways. For example, the PH GEM programme, the JPW programme or also BAN, other existing assistance. And through that portal we also want to empower these single mothers so that they can move out of the list.
Under poor and hardcore poor based on income at the 2019 Poverty Line level. This list of single mothers was obtained from eKasih data and certified at district level. Verification of single-mother status is appropriate to ensure that assistance is channelled to single mothers who are eligible according to the set criteria. For 2021, this one-off RM200 assistance involves 5,000 beneficiaries with a financial implication of RM1.0 million. The list of single mothers by state constituency (DUN) is as follows:
Chennah – 240, Pertang, 149, Sungai Lui – 64, Klawang – 183, Serting – 146, Palong – 42, Jeram Padang – 128, Bahau – 173, Lenggeng – 101, Nilai – 50, Lobak – 26, Temiang – 25, Sikamat – 52, Ampangan – 64, Juasseh – 171, Seri Menanti – 164, Senaling – 108, Pilah – 156, Johol – 194, Labu – 99, Bukit Kepayang – 99, Rahang – 33, Mambau – 96, Seremban Jaya – 37, Paroi – 117, Chembong – 237, Rantau – 99, Kota – 202, Chuah – 113, Lukut – 164, Bagan Pinang – 133, Linggi – 190, Sri Tanjung – 117, Gemas – 139, Gemencheh – 247, Repah – 219 and the DUN that is not stated, I don't know, 425.
This one-off assistance is expected to reduce to some extent the financial burden borne by these single mothers in carrying on their daily lives. Let me give one example, sem, sorry, during Deepavali there was a single mother who, after receiving the RM200, felt very proud and happy because she could buy necessities for Deepavali.
Some are channelled through Electronic Fund Transfer, and for those who do not have a bank account, they will be given cash, carried out personally by me or by the District Officer. Here I would also like to make one improvement, where I want UPEN to carry out this handover together with the ADUN of the constituency and the Coordinators.
The single mother data for Negeri Sembilan in 2021 is, as I said, more than 5,000. And JPW has held many programmes to empower single mothers: basic Android phones, online business courses, Shopee, WhatsApp, fresh and flawless makeup, wajah naik seri, digital women's world, online marketing and so on. And indeed, JPW has done it, PH GEM has done it. The new phenomenon is dropshipping, where single mothers are also given the opportunity to join dropshipping programmes selling products such as perfume, Coway, Mamasab Bakery, Chocodap's and others. Next year, PPWNS will continue with more skills programmes to generate income for women, especially single mothers, and they will be organised physically and face-to-face so that the impact is more effective.
Let me give a little history regarding PH GEM. PH GEM is one of the 6 promises contained in the Pakatan Harapan Manifesto for the 14th General Election (PRU Ke-14) under the portfolio of women, family and welfare. On 9 May, we won the election. On 23 May I was appointed as EXCO for Women, Family and Welfare. And in August 2018, I and the Department of Women's Development (JPW) submitted a working paper to approve RM1.6 million for the PH GEM programme. PH GEM, or, is an acronym for Powerhouse Wanita Gemilang. PH – Powerhouse, Gemilang, GEM is short for Gemilang. And the PH GEM logo has a diamond and a butterfly, because we want women to regard themselves as diamonds and not ordinary stones. And the butterfly so that women can make decisions to make themselves successful. This first decision is very important so that she wants to succeed in life and not merely be in the corners of the kitchen.
And they can be empowered and made self-reliant through the PH GEM programme. There are basic programmes, basic skills such as cooking, weaving, make-up. These basic programmes are indeed the favourites of women, but now in the third year, these skills programmes have been enhanced with, what is it, women's human rights, what is Syariah law for Muslim women, what is property law, how, how we can look after the environment. Because we cannot hold a programme that is solely about human rights. I think this is not a favourite topic for women. Most women will come for cooking, sewing, weaving, and we insert value-added content, namely the environment, health, 10 to 15 thousand steps, yes, we can, apart from holding programmes in the village hall, we go hiking up hills, we can go to the riverside to look for herbs or plants that are beneficial, healthy cooking. These are programmes with very high impact, to the extent that, to the extent that Mok Cun; Erma Fatima also wants to collaborate with us. Mok Cun is one example where village women can be transformed, village women can, do not think that you cannot succeed as a women entrepreneur. Mok Cun does not know IT, does not know English either, yet she has succeeded and marketed
products to every corner of the world. We want to use this example to encourage women from the villages to get involved and join the PH GEM programme.
We also have large-scale programmes in the PH GEM calendar, such as Hari Wanita and Hari Oren, which are attended by many participants. We had a simultaneous programme recently on 28 August, sorry, March 2021, a major programme attended by 6,000 participants in 8 Parliaments. And the programmes that had high impact on Facebook are:
Amazing Grace hand-knitted bag programme on 26 June 2020. 11 thousand views, 544 Likes and 26,900 reach.
Getting to know mushroom blocks on 24 January 2020. Also 11 thousand views, 462 Likes, 5,100 Reach.
Bual Bicara programme: Appreciating the Meaning of Independence – 28 August 2021. 22 thousand Views, 503 Likes and 4,900 Reach.
This shows that PH GEM has indeed had a very big impact. The fact that before this there were no questions about PH GEM, but recently there have been many questions about PH GEM, shows that PH GEM does have an impact. And I would like to make a little advertisement regarding the upcoming PH GEM programme. We will hold a programme for the first time, namely the Women's Parliamentary Simulation, where we will select 36 women to become ADUN for a day. They will be given exposure to how an ADUN debates and answers oral questions in the House.
The total expenditure used until September 2021 is RM1,105,580.10. This is to answer the question from Temiang, okay.
Dato' Yang Dipertua, after I advised this honourable House not to use examples or sarcasm that are unpleasant or sexist, or that demean the dignity of women, it seems to have borne fruit, because Negeri Sembilan is Negori Kito, a Negeri Beradat that practises the Adat Perpatih. I would like to extend my heartfelt congratulations and thanks to my fellow Honourable Members for following my advice. Dato' Yang Dipertua, before I end my speech, allow me to dedicate a teromba in this honourable House for the continuity of our friendship:
Bulat air kerana pembetung, bulat manusia kerana muafakat Round water because of the bamboo conduit, round people because of consensus
Faham sesuai, benar seukur. Bulat segolek, pipih selayang Rundingan jangan selisih, muafakat jangan bercanggah Tuan pada sekata, berani pada seia Berat sama dipikul, ringan sama dijinjing Yang tidak ada sama dicari, sama sakit sama senang Ke bukit sama mendaki, ke lurah sama dituruni Menghayun sama melangkah, Jika khabar baik diberitahu, jika khabar buruk serentak ditangani Jika jauh ingat mengingati, jika dekat temu menemui Dapat sama labur, hilang sama rugi
Until we meet again, thank you.
Thank you, Honourable Member for Bukit Kepayang. Next, Repah, yes.
Thank you, Dato' Speaker. I seek permission to remove my face mask. Dato' Speaker, first of all I would like to extend my congratulations and compliments to ADUN Sikamat, who successfully tabled the budget last Friday. In my view, this budget is a comprehensive and inclusive budget for the people of Negeri Sembilan. I also take this opportunity to thank all the ADUNs who were involved in the budget debate this time. I would also like to answer several questions raised by the ADUNs during the budget debate.
Firstly, ADUN Rantau raised the issue of the increase in prices of basic goods and the issue of profiteering. For the information of this honourable House, the Negeri Sembilan Ministry of Domestic Trade and Consumer Affairs (KPDNHEP) is always prepared to tackle the increase in prices of daily necessities. The inspections carried out involve price tagging, complaints of price increases, excessive profit margins and the licensing of scheduled controlled goods. It is to prevent and deter traders from taking advantage by raising the prices of goods at will. The Festive Season Maximum Price Scheme is also held to ensure that daily necessities during the festive season are not sold above the ceiling price that has been set, to ensure traders do not make unreasonable profits and to protect consumers.
For the information of this House too, the penalties imposed on traders who commit offences of profiteering are as follows, profiteering is as follows:
If it is a corporate body, the fine shall not exceed 500 thousand ringgit for the first offence. For a second offence, the fine shall not exceed 1.0 million ringgit.
And for, if it is not a corporate body, the fine shall not exceed 100 thousand ringgit or imprisonment for a period not exceeding 3 years or both. For a second offence, the fine shall not exceed 250 thousand ringgit or imprisonment for a period not exceeding 5 years or both.
Dato' Speaker, next, ADUN Kota. ADUN Kota proposed that every Member of the House, or anyone working every day, undergo COVID-19 screening tests for the good of all. That is indeed a good proposal. For the information of this House, the implementation of alternate-day RTK Antigen tests takes into account the guidance on the proposed reopening of Parliament from the Disease Control Division, Ministry of Health Malaysia, Putrajaya. It is carried out by taking into account the strict SOPs that must be complied with by all who attend the State Assembly sitting, including the RT-PCR test that must be carried out 3 days before attending the State Assembly sitting.
Next, ADUN Chuah raised the issue concerning Tanah Merah Port Dickson, where there is a Kualiti Alam waste management centre, and near the area there were cows that died from poison because they drank polluted river water. Please update on the investigation into the death of the cows, whether it is related to river pollution and Kualiti Alam, and what action has been taken.
For the information of ADUN Chuah, the Negeri Sembilan Department of Environment (JAS) has taken note of the above complaint. This department constantly carries out compliance monitoring of Kualiti Alam, namely after, namely discharges at the Effluent Treatment Plant (ETP) and the Leachate Treatment Plant (LTP). In 2019, discharges at the LTP were non-compliant and as many as 11 investigation papers were opened for prosecution in court. Since 2020, Kualiti Alam Sdn. Bhd. has not discharged effluent from the ETP because it is reused in the squelching process for use in the incinerator. Throughout the COVID-19 pandemic, monitoring was carried out online through the Online Environmental Reporting system. On 17 November 2021, sampling was carried out at the final discharge point at the ETP and the results are still not yet obtained.
With regard to the deaths, the death of the cows cannot be linked to discharges from Kualiti Alam Sdn. Bhd. The incident of the cow complaint was on 11 September 2021. A sampling of river water was carried out and no pollution was detected at that time. In-situ monitoring was found to be compliant. And I recommend to the cattle farm operators that they do not allow, do not let their cattle roam freely without control, because if the cattle suffer food poisoning, or poisoning, it is the responsibility of the breeder themselves.
Next, ADUN Chuah also …..
Let me interject briefly. I have once, I have once visited the Cypark area. Leachate was flowing out into the drain, not channelled. But it is the cattle breeders who are made to bear the blame, and that is wrong. I do not agree, because I have never seen, there is nothing to Cypark or Kualiti Alam, because I went there and the Environment Department once came to take samples, and until today we have not received any feedback from Kualiti Alam, this Environment Department. So the water is indeed there, I saw it, I did take samples. It cannot be near the mouth or nose, the smell is terrible. But if the cattle breeders are blamed, I do not agree. So I ask once again, please have Kualiti Alam check again or conduct water tests on the leachate from Cypark. Thank you, Dato' Speaker.
Thank you to ADUN Sri Tanjung. I take note of the matter. But I would just like to inform that when samples were taken from the river in-situ, it was found that there was no pollution at that time. However, the Department of Environment will continue to monitor the situation at both places, namely Kualiti Alam Sdn. Bhd. and also Cypark, to ensure this matter does not recur. At the same time, I would also like to advise the cattle breeders to control their livestock well so that incidents like this do not occur in the future.
Next, regarding ADUN Chuah, who raised the issue concerning Tanah Merah Port Dickson: the Ministry of Housing and Local Government (KPKT) has built an incineration waste disposal site. Please update on the issue of the incinerator site referred to as waste-to-energy. Please provide, be able to present the combustion temperature and the disposal of residue after incineration, what energy yield may be obtained, and please also update the EIA report.
For the information of ADUN Chuah, this waste-to-energy plant is implemented by Syarikat Cypark Smart Techology Sdn. Bhd. The combustion temperature of this waste-to-energy plant operates at at least 800°C. The waste-to-energy plant can dispose of waste burned in the incinerator and generate approximately 15 megawatts of electricity, which is connected to the TNB Sendayan PMU and then to the National Grid. Ash or incineration residue will be disposed of at the Cypark Smart Technology Sdn. Bhd. sanitary landfill. Approval of the detailed EIA report was issued by the JAS Headquarters, Putrajaya, on 10 April 2013. And for information too, the construction status of the waste-to-energy plant is 91% and it has not yet started operating.
Next, regarding the issue raised by ADUN Sungai Lui: the issue concerning sand heaps on Jalan Felda Lui Muda, Sungai Cermai, which causes flash floods in the surrounding area. For the information of ADUN Sungai Lui, the Negeri Sembilan State Government has set up a State-level Ops Lumpur Committee to control and memam, monitor silt and mud that may cause floods in Negeri Sembilan. Accordingly, a District-level Ops Lumpur Committee (Special Task Force) for Jempol District has been set up, and this committee is chaired by the President of Jempol Municipal Council and its members consist of district technical agencies, namely the Jempol District and Land Office, the Public Works Department (JKR), the Drainage and Irrigation Department (JPS), the Department of Environment and the Royal Malaysia Police (PDRM), who have identified the issue raised. And as a result of discussions and approval from PDT Jempol, a work operation to relocate the sand heaps will be carried out starting early December 2021 to an approved location. These relocation works will be carried out periodically until a long-term solution can be finalised.
Next, regarding the issue raised by YB ADUN Palong. The issue raised is: ADUN Palong requested that a haemodialysis centre be set up at Pusat Bandar Palong 4, 5, 6, because the nearest haemodialysis centres are in Gemas District and Bandar Seri Jempol. For the information of YB ADUN Palong, there are 4 health facilities offering haemodialysis services in Bandar Jempol, namely Jempol Hospital, and the other 3 are private haemodialysis centres: 2 in Pekan Jempol and 1 in Pekan Bahau. At this time, the Ministry of Health Malaysia focuses haemodialysis services at government hospitals and encourages dialysis activities through the Continuous Ambulatory Peritoneal Dialysis (CAPD) method, where the CAPD method can be carried out at home. It has become the primary choice of nephrology specialists because this method can reduce the transport costs borne by patients if patients undergo dialysis via haemodialysis. So, it is advised that the CAPD method is cheaper and does not involve high costs, and patients can perform CAPD near their homes. And there is no transport cost to be borne from home to the haemodialysis centre. So we hope all parties can spread the word about this, CAPD dialysis.
Next, ADUN Palong also raised the issue regarding providing temporary clinics or mobile clinics to assist those who seek treatment at Klinik Kesihatan Palong. For the information of ADUN Palong, Klinik Kesihatan Palong 4, 5 and 6 have received allocations under the item Projek Naik Taraf Klinik Daif. The specifications of the dilapidated clinic upgrading works cover rewiring works, roof repairs, air-conditioner maintenance works and reinstallation of telephone lines and internet lines. Services at Klinik Kesihatan Palong 4, 5 and 6 have been transferred to nearby clinics as temporary clinics. For outpatient services, residents may obtain services at Klinik Desa Palong 3. For chronic patient treatment, services are provided at Klinik Kesihatan Palong 7 and 8. Meanwhile, maternal and child health services are provided at Klinik Desa Palong 2. However, residents can obtain treatment at any clinic near their homes.
With regard to the issue raised by ADUN Palong as well, concerning: what action the State Government will take to ease the lives of the people in facing the issue of rising prices of goods. For the information of YB ADUN Palong, among the actions mobilised by KPDNHEP are the following:
i. Carrying out daily inspections and monitoring to tackle the increase in prices of goods.
ii. To tackle this issue, KPDNHEP has also directed traders to lower prices through the issuance of price reduction notification letters to traders. Until today, a total of 69 notification letters have been issued and 57 traders/premises have lowered the prices of goods, especially chicken.
iii. KPDNHEP has carried out operations and inspections of vegetable price increases at the chain level, the producer chain, wholesalers and retailers. Through these inspections, a total of 14 written notices under Section 21 of the Akta Kawalan Harga, Anti Pencatutan 2011 have been issued.
iv. Carrying out Ops Menu at all levels of traders, traders selling food in restaurants throughout Negeri Sembilan.
v. KPDNHEP also carries out Ops Pasar at all public markets, including wet markets throughout Negeri Sembilan.
vi. Imposing controls on goods that are sensitive during Raya, for example face masks and self-test kits, through this control. Price reductions can be checked from time to time.
vii. Strengthening consumer empowerment through the use of the price catcher for price comparison. Prices are updated daily for 443 items by Price Monitoring Officers. The price catcher is an application that we can download onto our smartphones. This application shows various types of goods, namely approximately 443 types of goods, and the prices of these goods are updated every day. So, it makes it easier for consumers to get price comparisons, to see where the price is cheaper than other places. So we encourage consumers to use the price catcher.
With regard to prices, the increase in chicken prices. For the information of ADUN Palong as well, chicken is part of the controlled items during the festive season, implemented under the Festive Season Maximum Price Scheme, which is carried out 4 times a year through the major festivals throughout the year. Any price increase is provided for under the Akta Kawalan Harga Dan Antipencatutan 2011 and through the Peraturan Makanisme Pencatutan 2018. And traders may be subject to action for unreasonable price increases.
However, KPDNHEP takes the initiative to organise the Program Jualan Keluarga Malaysia, where daily goods and basic necessities are sold 15–20% cheaper than market prices, including chicken and several other necessities. KPDNHEP is also always on standby in tackling the issue of rising prices of goods and continues to take action in accordance with the existing provisions under the Ministry's jurisdiction. KPDNHEP also remains committed to mobilising 100 enforcement officers throughout Negeri Sembilan to ensure that no profiteering activities occur and that traders continue to conduct business ethically throughout Negeri Sembilan.
So those are the answers that I wish to convey to the House. I once again thank everyone who took part in this debate. Thank you.
Thank you. Next.
Assalamualaikum WBT, bismillahhirrahmanirrahim, alhamdulillahhirrabil'alamin, wabihi nasta'in 'ala umuriddunyawaddin, ashsholatuwassalamu'ala asrofil ambiyaa iwal mursalin wa'ala alihi washohbihi ajma'in. Robbisrohlisodri, wayassirli amri, wahlul uqdatammilisani yafqohu qauli. 'Audzubillahi minasy syaitonirrojim ….[reciting Surah Ar-Rum, verse 41]: "Corruption has appeared on land and sea because of what the hands of people have done. This is so that Allah may let them taste part of the consequence of what they have done, so that they may return and repent." Ar-Rum, verse 41. A repetition of the verse recited by the Honourable Member for Paroi at the previous sitting.
The hadith I wish to bring up today, the Messenger of Allah SAW ….[reciting the hadith]: "Whoever sees an evil, let him change it with his hand; if he is unable, then with his tongue, that is, his speech; if he is unable, then with his heart, and that is the weakest of faith." Narrated by Muslim.
Mr Speaker, allow me not to wear a mask while winding up this debate. The Right Honourable Dato' Seri Aminuddin bin Harun, Menteri Besar of Negeri Sembilan; friends from the leadership of the Pakatan Harapan Negeri Sembilan State Government; the Honourable Members; Directors of State and Federal Departments; all officers of the Pakatan Harapan Government and the Pakatan Harapan Negeri Sembilan Government; Dato's and Datin's; and all the distinguished audience, whether present in this honourable House or watching this sitting live. Thank you to the Honourable Members who touched on matters relating to agriculture, although they were not among the questions requiring oral answers, but during the debate. This shows that agriculture is a very important activity that must be well managed, because it is the foundation of food production. Without food, everything around us is meaningless. When the belly is hungry, don't joke around. That is exactly what the Honourable Member for Rantau said at the start of his debate the other day.
Mr Speaker, I am certain that not all of us here today will meet again in the next sitting. Therefore I wish to wind up this debate by sharing a reminder for all of us, whether Muslims or non-Muslims. If I say "those who are not yet Muslim", I am afraid Jeram Padang will jump as well. I know they do not yet understand, and if they understand later, they will thank me. The Keluarga Malaysia call by the Right Honourable Prime Minister of Malaysia is, in my view, a realistic call. But how is it to be implemented? This is where we need to return to and appreciate the principles of the Rukun Negara, especially the first: "Belief in God". Therefore I call once more on the people of Negeri Sembilan in particular, and the people of Malaysia in general, to practise the teachings of their respective religions. Although we Malaysians differ in race, religion and cultural values, this is one point of convergence where all religions instruct us to do good. None instructs us to do evil. This is also in line with the word of Allah SWT, Surah Luqman, verse 33 ….. [reciting the verse]: "Allah calls upon mankind" ….. [continuing the recitation]: "until the end of their lives. O mankind, be mindful of your duty to, to you, and fear the day when no father can help his child, nor can a child help his father at all. Allah's promise is true, so let not the life of this world deceive you, and let not the deceiver, that is Satan, deceive you concerning obedience to Allah SWT." And by returning to practise our respective religions, we can realise the Prime Minister's call of Keluarga Malaysia in full harmony. By rejecting any form of extremism in religion.
Mr Speaker, I would like to extend congratulations and well done to the Right Honourable Sikamat, who tabled the 2022 Budget under the theme "Membudayakan Upaya Ekonomi Rakyat". And thanks also to the Right Honourable for approving the proposals for my portfolio, under my ministry, which, although not all, a large part of them were granted. Thank you.
Thank you to, I take this opportunity to thank the agricultural frontliners in the 3 main branches, namely Agriculture, Veterinary Services and Fisheries, who worked tirelessly while navigating the COVID-19 pandemic. I also extend my thanks to YB, the Honourable Member for Paroi, who helped promote this morning, what's the name, the Jelobu District Council, which obtained number 3 in, from, throughout Malaysia, in certain categories.
The Honourable Member for Paroi also mentioned this earlier this morning. But I want, want to add a little, yes, my condolences to the Honourable Member for Rantau. Although, as YB Chennah said, it was a triumphant victory in the Melaka state election (PRN), there is no need to be too proud, yes. It looks arrogant, eh, because you have already asked for the general election (PRU) to be brought forward, yes. Yet we know that there was turmoil overall, to the extent that the Chief Minister of Melaka, was forced to be sworn in at 1:00 am. And there were important people who could not attend,
wallahu'alam, yes. I would remind, I want to remind all of us here, that a victory is not necessarily a blessing bestowed by Allah SWT. It may also be istidraj, na'uzubillah, wallahua'lam.
Mr Speaker, I would like to answer the questions raised regarding my portfolio. The Honourable Member for Rantau and the other State Assemblymen touched on rising prices. As was, was mentioned by the Honourable Member for Repah earlier, indeed there are goods, price increases of goods which are under the control of the Ministry of Domestic Trade, Cooperatives and Consumerism (KPDNKK). However, economically speaking, in general, the price of goods is closely related to production and demand. This is where the role of the relevant Department of Agriculture comes in, to stimulate food production.
In 2021, we allocated, that is this year, 1.0 million for the Agro Food Production Incentive. We give 20 sen for every food or agricultural product produced. However, next year we are not providing a focus initiative, taking note, by taking note of the suggestion from the Honourable Member for Gemencheh on that day, God willing, we will continue a similar initiative, namely the special food production initiative, agro food production, God willing.
In 2022, we have a new initiative: the Agro Fund totalling 3.0 million, which is an interest-free loan scheme. This means the State Government will finance the management costs, which will also focus on food production. We also have a list of incentives that will be continued, such as Siswazah Tani, Petani Muda, Abandoned Land Development, Fruit, Vegetable and Potential Industrial Crop Development Clusters, and also rice.
In controlling or taking initiatives to, to monitor the rise in the price of these goods, FAMA has also been conducting monitoring at certain places or certain premises.
The State Assemblyman for Rantau also touched on the issue of food production at the TKPM (Permanent Food Production Park) in Negeri Sembilan. At present, the total area of TKPM and Ladang Rakyat in Negeri Sembilan is, there are 8 areas covering 428 hectares involving 106 operators. Of that area, 7 project areas focus on vegetable production, with the physical area for those vegetable crops being 140 hectares.
The State Government constantly strives to increase production by developing new areas to ensure opportunities for operators to generate income and, subsequently, contribute to the production of food materials in Negeri Sembilan. The latest location currently under area development action is Kuala Gemas, involving a physical area of 40 hectares.
The objective of implementing TKPM and Ladang Rakyat is to establish Permanent Food Crop Production Zones and to encourage efforts and the private sector to, to produce commercial food crops, and subsequently contribute to the increase of the nation's food production in a sustainable, quality and safe manner. In this regard, the yield of TKPM and Ladang Rakyat over the past 3 years is: 2019, a total of 6,380 metric tonnes valued at 12.72 million. A decline in, in 2020 – 5,210 metric tonnes valued at 11.75 million. In 2021, with the pandemic situation worsening, our production indeed dropped to 3,907 metric tonnes valued at 9.3 million ringgit. So, the Honourable Member for Rembau said our TKPM is fine, that it is not producing any yield, meaning, not, that is not accurate, yes.
Mr Speaker, the State Assemblyman for Gemencheh and the State Assemblyman for Chembong asked about the natural disasters that, that the farmers are facing. In relation to this matter, for natural disaster assistance at present, the State Government indeed does not have a special fund for natural disaster assistance. However, such assistance is available at the Federal level. Nevertheless, we will usually provide ex gratia aid to the farmers affected.
Answering the question from …..
Mr Speaker.
Ya.
Yes, there is one question. I want to get a clarification, my question is that in the Gemas area there are 2 rice areas, namely the rice fields of Kampung Londah, Sawah Londah and Sawah Bangka Hulu. We have found that at this time they cannot go down to the fields or cannot plant rice, because of the development currently being carried out in those fields by rectifying water drainage and so on. So my question is whether there is any ex gratia aid from the State Government or whether an allocation will be applied for from the Federal Government to provide assistance to those affected, considering that almost 2, this planting season or
2 they cannot, 2 planting seasons have already failed because of the development problems in their fields. Thank you.
At present we indeed have no plans relating to this irrigation, at the Londah location, yes. Only that day, we did indeed discuss, yes, the development of that irrigation canal, where for 2 years, I was informed, they will not be able to plant, to be planted with more suitable crops. But that discussion was not continued and it was not, not, not realised.
Mr Speaker, there is one small question, yes. I would like to ask about the Air Kering permanent agricultural estate in Lui Timur. What agricultural products are, that are supplied or available at the Air Kering Estate, Lui Timur?
The Air Kering Estate in, in Jempol, which covers 39 hectares, its focus there is the production of tapioca, tapioca, and, but there is also other production. But the focus is indeed tapioca, and we have an operator who has been very successful in producing it, if I am not mistaken, Encik Razali, yes.
Regarding the names of the farmers mentioned by the Honourable Member for Gemencheh, who suffered the disaster, so far, our checks have not, we have not found any report or application for any compensation. However, our checks also found that the 3 names mentioned, namely M. Dahlan bin Hasan, received AgroCash, the AgroCash food security incentive, totalling [RM]11,623.60 sen; Mohd. Shahir bin Arif – AgroCash received [RM]2,621.40 sen; Ibrahim bin Ismail – vegetable cluster, received assistance of up to 36,000.00.
And for the information of this honourable House, indeed when there are disaster reports that result in losses to farmers, the District Office and the State Agriculture Office will forward the application to the Federal Government. However, so far, in 2020 a total of 20 applications were made. I am informed that none of them received approval from the Ministry, yes. And in 2021 – 3 applications have so far also not received any confirmation from the Ministry.
Mr Speaker, the question from the State Assemblyman for Chembong regarding assistance to affected farmers and livestock breeders during floods, I have already, I have answered it as a whole.
The Honourable Member for Sungai Lui also, mentioned, mentioned compensation.
The Honourable Member for Klawang, just a little, the Honourable Member for Klawang.
Ya.
If the Honourable Member for Klawang says there was no application, in fact Encik Ismail earlier had already applied, a police report was lodged, a police report was lodged on 11 November 11, 2021, and photographs of the flooding were sent to the Department of Agriculture. So it is hoped that, although there is no specific assistance from the Federal Government, the hope of these farmers is to get some assistance from the State Government. Thank you, the Honourable Member for Klawang.
Usually, yes, we will give, I will look into it further, further. So usually we will give assistance of around 3,000.00 ringgit.
Lui, eh no, Chembong, where was it, regarding LSD I think, yes. There are livestock farmers who had to cull their livestock because they were, were infected with Lumpy Skin Disease, yes. Indeed we do not give commercial market-price compensation, in, and it is also compensation from the Federal Government, yes, at this, at this level, the Headquarters. For calves under one year old, 700.00 ringgit; if half-grown, 530.00 ringgit. Beef cattle over one year old, 3,500.00; if half-grown, 800.00. For dairy cattle, 5,000.00 at current price; half-grown, 1,000.00. Selected breed, current price, 8,000.00; half-grown, 2,000.00. These are the forms of compensation that, that if the cattle had to be culled, so far, 30, eh 44 livestock have been, have been confirmed positive, yes.
Regarding FELDA plantations to be used as grazing fields. We received feedback from FELDA that there is no obstacle, but an application must be, must be made and a few conditions that must be, must be complied with, and also must obtain permission from the Department of Veterinary Services.
Smart Agriculture from the ADUN for Chembong, yes. Under the Shared Prosperity Vision 2030, Negeri Sembilan has been placed under the smart agriculture and high-value agriculture hub. Most recently, the state, the State Government through the Department of Agriculture will develop a high-value Smart Agriculture model, a factory veggie, at the Sendayan Agricultural Centre, which will, will cost 200 thousand in this year of 2022. This model will be used as a reference for any entrepreneur who wishes to implement this method, and will also serve as a training place for those who are interested. But before that, I also want to focus on abandoned land. In the records we have, there is still a lot of abandoned land before we go to this Smart Agriculture Hub, 11,000 more hectares that we can still cultivate in the field before we go to this factory veggie.
ADUN for Chennah: the issue relating to the implementation of initiatives relating to, proposing a session with participants of agricultural graduates, young farmers, and then holding a dialogue session. This is a very good initiative, a very good suggestion, and I myself, individually, have indeed gone down to see the progress of these participants. We have, so far, 122 agricultural graduates, yes, who have received this beneficial incentive, namely 54 participants (2020) and 68 participants (2021). 74 young farmers have been approved this year. Overall, the beneficiaries from this youth group are 100, nearly 200 people, yes: 196 for the two-year implementation period with an allocation of 1.5 million. In 2022, with an allocation of 1.0 million, it is expected that 100 new participants will be added, consisting of 50 graduates and 50 young farmers, who will be assisted not only with grants but also with training and courses related to the crop projects being undertaken. The proposal to hold that dialogue is a good proposal and, God willing, we will implement it.
The SOP for implementing this incentive, as usual, we have on our official portal on how to apply for all these incentives. We have our standard operating procedures, SOPs, that must be, be followed, and approvals are according to the existing procedures.
Dato' Yang Dipertua, as many have mentioned the COVID-19 pandemic and, and the rise in the price of goods, and there are also accusations against the government as if it is not doing anything or helping the affected people, and so on. But in fact the government has indeed been helping, Dato' Yang Dipertua. But as I said, in the previous sitting, we did not go to the root course, I had many things I wanted to find out about the root course but no one debated from this angle, so let me be the one to say it. The verse I recited earlier, at the beginning, is a affirmation from Allah SWT: whatever calamity we receive, whatever, whatever happens, is the result of human hands themselves. This means whether Muslims or non-Muslims, yes. Therefore it is very fitting that we together reflect on the root cause of COVID-19 based on the reminder of Allah SWT, so that it can be avoided in the future.
It is very wasteful, I say again, if we are busy cleaning a dirty river at its estuary, but allow the wrongdoing that pollutes it at its source. We all know the cause of COVID-19 is the attitude of a segment of the people of China in Wuhan who ate exotic food, with permission, which was forbidden by Allah SWT. Allah has said ….[reciting Surah Al-Baqarah verse 168] …..
Dato' Dipertua, please clarify that.
Ya.
The one who just spoke, what do the Chinese community eat? Repeating again.
Exotic, exotic. He, what, this, I, news, what, this fact, given by, by, by the WHO, yes, exotic, exotic foods that, but in the Al-Quran, Allah calls upon mankind ….[reciting part of Surah Al-Baqarah verse 168], the good, the good and wholesome ones, yes, "and do not follow the footsteps of Satan, indeed he is to you a clear enemy". That is how we are, for me, within the framework of advice, advising one another, and so that we can together address what has happened.
Honourable Dato' Yang Dipertua, I call on us to practise, yes, our respective religions, yes, indeed there is no single religion, Yang Dipertua, but here is our meeting point if we wish, where all religions command goodness, which I mentioned earlier. And we reject any form of extremism. The Al-Quran is indeed guidance for all mankind, where Allah calls, yaa ayyuhannas; O mankind, but without internalisation, witnessing of faith (syahadah), and without practice, it will not become guidance and mercy for all the worlds, namely in Pakatan Harapan we proclaim rahmatanlil'alamin, with His permission. What we obtain now in relation to what we had before, what we obtain in the hereafter is related to what we do in this world.
That is all, and Allah knows best. We will meet again, if not in this world, make sure we strive to meet in paradise later. And with Allah is success and guidance, peace be upon you and the mercy and blessings of Allah.
Thank you, Honourable Klawang. Next.
Peace be upon you and the mercy and blessings of Allah. I see many seem to be dozing off. So thank you Yang Dipertua, Dato' Yang Dipertua, all friends, my department, and also to all friends over there who have helped me too. We work as one team, although perhaps our missions differ, our vision and main purpose is to advance and succeed our state, our village, our state and also our country. This is what I think is good for us as government officers, whether as EXCO or as government ADUN, or as opposition ADUN, we have a duty and responsibility that we must carry out. And all these responsibilities will be questioned of us. So let us together carry out our responsibilities as a team, and God willing we will become a developed nation shortly, in line with our neighbours on the right and left, namely the State of Selangor and also Melaka.
I want to answer several questions raised during the debate. Firstly, from the ADUN for Juasseh, I will start with, yes, the opposition, that's fine. The school PIBG could not, could hold a invitation programme. So as far as I know, when I was in PIBG, meetings were usually held at the school, never held at other places, because we want to discuss the development and also the progress of the school. But regardless, this is perhaps an irregularity from the level of the Ministry of Education, which does not allow any, anyone at all to use the school, that is an educational institution, as a venue to ensure the success and progress of education. We hope that the performance of the Minister of Education will be evaluated.
The Kuala Pilah District and Land Office did not receive an official letter. So if there was an official one, perhaps it was given. But if possible in future, I, who handle this, perhaps mostly through the village heads in MPKK here, we think applications were requested, but please, not at the last minute. When it is last minute, there may be problems. I was informed by the Land and District Office, Kuala Pilah District and Land Office, that they have never received any application from any PIBG party to hold meetings in any community hall or multipurpose hall under the management of the District Council and the Kuala Pilah District Office. So I ask, I would urge, if this is a mistake, please correct it again, so that next time if they want to, ask. We feel this is an opportunity for us to ensure that the Ministry of Education's mistake in not allowing the use of school institutions for PIBG meetings is corrected.
Dato' Yang Dipertua, I beg to interject, Dato' Dipertua. Regarding what Labu just said, I somewhat disagree that it is an irregularity because meetings cannot be held at schools, the PIBG simply follows the SOP. Please ask Labu to check again, the SOP that was issued did not allow outsiders to enter during this pandemic. And secondly, I also do not agree with Labu's statement that there were no applications. I once officiated a PIBG at the community hall, but behind the scenes, the MPKK said, why was the YB ADUN invited and not the State Government to officiate, by the MPKK. I think this matter needs to be checked again, Labu, yes.
I thought I had received the answer from the office, from government officers, so do not, I do not, I do not rely on perception and so on. That is why I said earlier, we respect government officers and ensure that this matter, we want to speak the truth, there must be confirmation. I cannot speak carelessly. That is the first point, yes.
Secondly, I would also like to state regarding the people, Sungai Lui, my friend too. Kampung Orang Asli Sungai Sampo and the largest Orang Asli settlement in Negeri Sembilan. The population of this village is 1,458 people and heads of household number 378. At present, JAKOA, the Department of Orang Asli Development (JAKOA), is focusing on achieving 100% basic facilities in Orang Asli settlements in Negeri Sembilan. That is my vision, that these basic matters should have been resolved earlier, but they still have not been resolved, so we will take, ensure that we can resolve these basic facilities.
And also we see also regarding …..
Dato' Yang Dipertua.
….. supply. Wait a moment, I will speak, I, I want, want, want to speak first. Later I will give you space, don't …..
Okay, okay.
….. no problem. For those who have not yet received electricity and water supply, I call on you. I have already met with major corporates, if they have CSR, please give, because lights are simple, use solar, solar technology is not very expensive. One house can cost 200 to 300.00 ringgit. So if they have no lights, never had lights, let us give them the opportunity. This is what I hope, if there are ADUNs, ADUNs or representatives who have constituencies there, let us give. If we cannot do 1 or 2, let us give 10, like here in Sungai Sampo where there are 11 houses. Ha
This is us, I have spoken with, what, corporate companies who wish to help our Orang Asli so that they are equal with us. After 64, how many years since independence, they still do not have the facilities of lamp posts, electricity, ha, this is what we want. And there is now new technology for charging at a fairly minimal cost, God willing. Which ADUN constituency doesn't have it, there are more than 15,000 Orang Asli, I hope we can resolve their problems quickly. That is my hope.
Thirdly, from Tuan Noor Azmi bin Yusof, his question is regarding wild boars and monkeys. The effectiveness of installing traps for wild boar and monkey species depends on the cooperation of complainants and residents. Some succeeded, some did not succeed. But do not say all have failed. In my view, that is why we have set up boar traps and also we have shot them. So if we all did not do anything, we would not have experience. I have been to Rembau, I have been to Jelebu, I have been to Labu too. So let us not make accusations that cannot, cannot be relied upon. That is why the Most Honourable Sikamat provided assistance to build cages to ensure that we can, can ensure that the matter can be resolved. Not all monkeys can be shot or caught, they, they have methods, yes, we must refer to the Department of Wildlife and National Parks (PERHILITAN), yes. So one reason may be that the licence to hunt wild boar does not exist, it was done away with long ago, so now if possible let it be reopened, and God willing enforced on an interim basis starting 2 October 2021. So from now on it will be fine, because in Rembau, when I went to Kampung Senama earlier, the wild boars were eating together with the goats, with the cows down there, that is what we fear, yes.
Then the ADUN for Senaling, which I already mentioned earlier, regarding PIBG, in my view, I think there is no, no need to repeat it again.
ADUN for Palong, this one is regarding rubber. I have entered estates, in FELDA, wherever I went, but many times I entered, I have never met the ADUN who is in that constituency, so to speak, everywhere. In Rembau too, in Chembong too many times, but he sent a representative. I request that next time, I want to stop by at Grobok Salai together with him, to see the problems there, God willing.
Senanti, Senanti?
Ya?
Has he entered Senanti yet?
I have entered Seri Menanti many times.
Eh, didn't tell. Try to tell.
Yes, what to do, I did come, got, this elephant problem, it cannot come …..
You have to inform before you come, To'.
…. then, we come.
This is only when the elephants come.
….. there are many other cases, I have already entered them. So I will not say more. Once again, let us meet, because I do not want to say it here. Let us go down to the villages, yes, and see.
This question concerns rubber, rubber tappers: what is the State Government's plan to improve the livelihood of the people. For your information, in response to the question posed, I am pleased to inform the House that the rate of assistance under the rubber replanting assistance programme in Peninsular Malaysia, applied for by RISDA (Rubber Industry Smallholders Development Authority) through the Ministry of Rural Development, has been approved for an increase from RM9,230.00 to RM13,710.00 per hectare. So, if the price of poison rises, or other materials, we have them, and they will be taken into consideration. So if possible I ask, and also for any of those who perhaps cannot tap rubber, there is also assistance; you may refer to, to, to RISDA for seasonal assistance, during the rainy season, yes.
Then let us look at the ADUN for Chennah. Regarding Desa Muafakat. Desa Muafakat has been completed for a long time. My EXCO, I have stated to all the District Officers through the KADO and also the ADO, that when we plan development in new settlements, make sure there are road reserves, there are reserves for lights, there are reserves for fire and water and so on, so that the cases I mentioned earlier in the previous House do not happen again, where all the land was given out and there was no reserved place for a hall, for a village hall and so on. So I hope, I ask, I request that the face mask [face mask] be removed. I ask that we make planning for this matter. Insya-Allah, 10 to 20 years from now there will be no problem of having houses but no road to enter, and other facilities, yes. So to begin, start by ensuring what is called an orderly village with the facilities that should be provided, including the latest one that we have added, namely facilities for telecommunication towers, yes.
And also, for the question on Kampung Chennah, we have several, 2 to 3 villages have started in, in Jempol. And we will start this shortly, Kampung Chennah. The Village Expansion Programme in Kampung Chennah, Jelebu, involves State Government land with a total area of, the total area is 2.36 acres. At this time, preliminary works such as survey work are being carried out by the Department of Survey and Mapping to determine the actual number of lots that can be provided for the site before earthworks and basic infrastructure works and related works can begin. The implementation method of the Village Expansion Programme for Kampung Chennah, Jelabu, is through the allocation of lots to eligible participants based on the criteria that have been set.
And at the last MMK meeting too, we proposed that if there is vacant government land in the villages, we try to distribute it to those, especially as just mentioned, single mothers, persons, persons with disabilities who have no land and no house yet. We give priority to them. So we ask all District Offices and Land Offices to ensure that applications for this land, if there is such land, we distribute it for their benefit. We do not have a lot of land to give 10 acres, 20 acres, 100 acres more. We can give it for house sites, yes. Then let us look at the question from the ADUN for Lobak, concerning JAKIM, for the Orang Asli village of Belihoi. Regarding the multipurpose hall in the Orang Asli village of Belihoi, this falls under the responsibility of the Department of Islamic Development Malaysia (JAKIM), because they built it, they have to maintain it.
As for the water supply issue, the residents of this village use river or hill water sources as their daily water supply. Disruptions occur during the rainy season. When it rains, the water is muddy, and when it is, what season is it, the dry season, there is no water. Yes, this is what they depend on …..
Pertanyaan, pertanyaan.
Ya.
So, if possible, can we continue with SAINS water supply for Kampung Belihoi?
I want to answer this, this is also the answer, however the villagers still want to use river water, hill water. Yes, this is their wish. Because there are projects that have been provided by the government, they do not want to use them. They want to use the original water. They do not want to use what is, what, what is not original, they want original water …..
Okay, Labu. Perhaps this is all for now. But I, who often come here, they have made an appeal, if possible to get this, water supply from SAINS, which is better …..
Okay.
…. times have changed.
But this was reported by the Department of Orang Asli Affairs, so I will investigate and check again. And I certainly know that in Lenggeng there is another village involving about a dozen houses without water facilities, that, that from SAINS. We have tried to apply for it to be arranged and carried out next year.
Okay.
Regarding the ADUN for Lobak as well …..
Honourable Labu, may I interject briefly? On the water supply matter, in my constituency too there are 11 villages, and it is very likely that the residents think that if they use river water they do not need to pay monthly bills. So a study must be done again. I assume perhaps that view is not correct or not accurate, not accurate, which is what I mean, because in the Orang Asli villages in my area, they need, they want water, SAINS water. That is what I …..
I ask the relevant parties of the Department of Orang Asli Affairs to, to, er, the Ministry of Rural Development, so I ask for a true and accurate report, and we will try to research it. But indeed some villages do not want water from, from this pipe because it has gas or there is chlorine and so on. I am informing you, it does exist. So I need not mention which villages, but indeed some of them, because they are not wanted by the people there. We cannot reject that, because even with vaccines, however good they are, they still refuse, because they have their own views or opinions. So we must respect them and we must be considerate to them. Whatever the case, efforts will be made to ensure that the basic facilities of water and fire supply can be resolved as quickly as possible, in line with our country's progress, yes. One more thing …..
That explanation …..
Dato' Chairman …..
….. with permission, an explanation …..
….. interject, yes? Interject, yes?
Ya, ya.
About the water just now, yes, I agree with what Labu just said, that the Orang Asli want to use river water. I know the reason, because they, they do not want to pay, they do not want to pay the monthly bills. So, I propose that the State Government either provide it free of charge or find another alternative, yes, so as not to burden, burden, what is it, these Orang Asli residents.
And I also propose to the ADUN that we look for CSR facilities from corporate bodies to provide it. That is why I, I implemented it. We try to do it because this is not many people, there are certain ones with 5 to 16, what is it, families. So sometimes we should do good deeds while we are in power. Try to, help when people need help. Do not later, when we are no longer there, be unable to do anything. We only talk. Those are all my views. I will work together with fellow ADUNs, whether opposition or government, so that together we resolve problems that have remained unresolved for a long time until now, yes. That is my hope.
Explanation, Dato' Speaker …..
Ya.
….. actually the Orang Asli village of Belihoi did apply before, but as was said just now, the reason from SAINS is that the big pipe does not reach that area. That is their problem. They did apply before. Thank you.
As stated by the honourable, my friend from Seri Menanti, he has had long experience with these Orang Asli, I understand that. Because, whoever, who is going to pay, if everyone wants it free.
Yes, this is one problem that we must ensure we can gradually erode this mentality, it will take some time, yes. Because if possible, our people all want things free. I, I apologise for saying this, there are asnaf who do not want to leave the asnaf category because they want to get assistance. We try to motivate them so they become people who strive and succeed. This is the role we are playing, especially for the entrepreneurs we help. Sometimes they want everything to be helped. As entrepreneurs, they do not even want to register with SSM (Companies Commission of Malaysia). RM70.00. I say, it is worth it, RM70.00, you pay, we give RM3,000.00. If, let's say, they are too busy, stop for 2 days, if you get RM100.00 in 2 days, RM200.00, we give RM3,000.00 without payment. Yes, this mentality must be gradually resolved. This is what we are facing now.
And I also hope that many university graduates come out, with substantial assistance, with the, the, the, the good assistance, we ask that they take, with this COVID situation, many people can succeed because they use their skills and knowledge and also new technology, where it is better and even greater than working for a salary. This too is an attitude we must gradually erode. In the past everyone wanted to work for the government, and now government jobs are being cut or frozen, reduced, so we say, become entrepreneurs. This is a very good opportunity for young people, yes. That is my hope.
And I also ask that, if possible, we help develop the Orang Asli a little, especially in housing, yes. Sometimes I went to Jelebu recently, just the village at the back there, near Kuala Klawang. The Tok Batin there, I said, there are 2 Orang Asli houses, one Muslim, one non-Muslim, and this Tok Batin. I saw all three houses were dilapidated. Living in a hut. And I have already tried to get assistance. If possible, please give it, it pains me to see these people, as if we had never, hayati or support them, indeed they are very poor. Living hand to mouth. So if possible I really ask, if we rely on everything from, the Ministry of Rural Development, it is indeed limited. So I suggest the State Government, in the name of, what is it, charity, let us help. If in one year we can give 3 to 5 houses, then Insya-Allah in a period of 5 years we can overcome one village of about 20 to 30 homes. Which …..
Excuse me, excuse me a moment, Labu, Labu, excuse me.
Ya.
On this matter, of the original people, the Orang Asli in the villages there, we have only been in power for just over 3 years. At the 15th general election, we will surely win. At that time, we gave everything free. Water, fire, everything we gave, Orang Asli we gave free, okay, that is my proposal.
Seremban Jaya has no Orang Asli. You must not interfere. You have no Orang Asli.
I myself have entered the Asli villages following Labu.
Because Seremban Jaya is one of the EXCOs whom I called, and there are 3 EXCO members. If anyone wants to come in, I can say, to see the Orang Asli, to experience the hardship and the poverty of their lives too. So he is one of those who is active, he often comes. So I ask, perhaps at the time …..
Faham?
Ya?
Seri Menanti, do you understand? Chembong, do you understand?
Understand, understand, understand.
Okay, I ask to open, if there is anyone, Chembong …..
Honourable Dato' Speaker, may I seek permission. I request that Labu make a decision on the proposal from Senawang Jaya just now, if …..
Yes, Seremban Jaya.
Seremban Jaya. Regarding providing, providing free water supply if, what, yes. We do not promise, yes.
I cannot give a promise here. I, what I do. Listen to what I say first. I speak with caution, I am not making promises, promises that are not, not fulfilled, that is not our way. I would say that if any major corporations have CSR allocations, provide free to those, we will look for that. But as a government, we must not, make a policy that perhaps should not be so, yes. This is my view.
Senawang Jaya, do you understand?
Chembong understands. But my proposal, my proposal, my proposal.
I propose that if he does not understand, next time do not bring him again.
Honourable Labu, before I raise this, I hope the Honourable ADUN for Seremban Jaya first resolves the Gatco problem. Settle those promises first ….. [Commotion in the Public Gallery – simultaneous speech among the YB ADUN for Sri Tanjung, YB ADUN for Repah, YB ADUN for Seremban Jaya and YB ADUN for Jeram Padang]
Yes, yes, yes, indeed.
….. only now thinking about PRU 15 …..
Indeed, indeed, indeed.
Honourable Labu, yesterday …..
Hello, do not run off the topic.
ADUN for Jeram Padang …..
Honourable Labu …..
ADUN for Jeram Padang, ADUN for Jeram Padang …..
Now talking about the Orang Asli …..
ADUN for Jeram Padang …..
….. do not talk about Gatco …..
….. do not worry …..
….. before, you did not fulfil your promises …..
[unclear speech]
….. the Right Honourable Menteri Besar of Negeri Sembilan, yesterday …..
….. there is no other issue, there is not …..
…. Do not …..
Sit down, Jeram Padang, sit down. There are no other issues, sit down, sit, sit.
….. what is the answer …..
Are 3 people the same as 10 people?
Even if you 5 stand up, not one of me here can be matched.
Yes, yes, indeed cannot be matched. About …..
Honourable Labu …..
….. indeed cannot be matched.
Honourable …..
….. do not always twist and turn …..
[unclear speech]
….. Jeram Padang twists and turns …..
[unclear speech]
….. 8 acres only just completed …..
Enough. Sit, sit, sit.
[The commotion subsides]
Honourable Dato' Speaker, I wish to bring to the attention of the Honourable Member that the telecommunication tower in the Asli village of Klebang is still unresolved. The site has been visited 2 to 3 times already but there has been no answer. I have written to MCMC (Malaysian Communications and Multimedia Commission), but there is still nothing. Another matter is, what, why these Orang Asli villages are not listed in those 60 initiatives. What is wrong with that? Please add one more initiative with RM2.0 million to repair houses in the Orang Asli villages. So I hope that the Right Honourable Sikamat will take note, there are indeed many initiatives but I think the Asli community specifically has none. So I propose it. That is all. [Commotion in the Public Gallery – simultaneous speech among the YB ADUN for Sri Tanjung, YB ADUN for Repah, YB ADUN for Temiang and YB ADUN for Jeram Padang]
….. it was the BN government …..
On issues like this, I agree …..
….. it was the BN government because …..
Jeram Padang …..
….. before, you did not want to do the work …..
….. I say again, what you promised before the 14th general election, resolve it first, do not talk at length …..
Indeed we have resolved it, indeed we have already resolved it …..
….. the 4 acres was the BN's work …..
….. empty, unlike Jeram Padang …..
….. do not ask us to resolve it …..
….. empty promises, we fulfil.
Not qualified to make promises …..
What do you mean not qualified? You, when you were EXCO before, did not resolve the problem …..
Before, you slept every day, now you only start talking …..
….. tidur you …..
Sudahlah.
….. sit, sit, Jeram Padang, sit down.
….. do not talk at length, Sri Tanjung …..
….. when you were EXCO before …..
Duduklah, duduklah.
….. now you want to tell us all sorts of things …..
…..buktinya …..
….. 60 years …..
Jeram Padang, sit down.
….. did nothing.
Control, control.
Make this Chamber a place …..
One on one, you become …..
….. civilised. Mature politics.
….. Jeram Padang cannot even write a letter.
I think …..
….. cannot even fill in a form …..
Kepayang …..
….. how about …..
….. give a pantun, pantun. [The commotion subsides]
Dato' Speaker. I think, I, I, let us, what, settle it amicably. But if possible, we indeed want to resolve the existing problems in the best possible way. Whatever the case, we cannot make promises that we may not be able to carry out at a possibly high cost. That is why
that is why we as ADUNs must think about how to prepare a budget that meets …..
I agree with this. Do not make promises before the general election.
….. as much as possible, our people can help. Okay, Yang, I would further like to stress that whatever the budget, whether good or best, its implementation must be carried out in the best way. So I would like to remind everyone, both the opposition ADUNs as well as our ADUNs or DUN Coordinators, that we must go down and engage with the people. Ask about their problems, and do not let them be. I would like it if the opposition friend ADUNs could have a copy of the letter sent to us, because we have monthly meetings. So we can see, as earlier, the SKM tower, so we were not informed, but whatever the case we will try to ask the relevant parties so that we can resolve it. That is the problem we will try to implement.
And indeed I did say, we cannot let this problem drag on. So if possible we must think of a solution as quickly and as well as possible. That is my hope as EXCO for Rural Development, whose work is going to the villages to see. So that's it, if possible, together. So, in the MARRIS budget there are actually many allocations that can be requested through, but we must respect the Village Heads, because I, we in the MMK meeting, have decided that whatever programme, whatever good thing is to be done in that village, if possible refer to the Village Head, whether the new Village Head or the old one. Must do, must, we must respect them, because we must institutionalise the Village Heads in the best way. If we do not respect people in the village, then we have a problem. That is why I said, enough of the continuous squabbling. Wherever we have many commonalities, we use these commonalities for us together. I say if we are hostile to the person on our right and the person on our left, where can we run? One day the villagers will meet us too, yes. So that is why, my view is that there are differences which we acknowledge, and there are many commonalities which need to be resolved; we resolve them as quickly as possible. That is my hope, yes.
So if possible, tomorrow we meet again, don't be afraid. We meet, and there is no problem to discuss, sitting anywhere. We say, look, we can. If in the House we can sit and discuss together, outside, in the villages, at the village stalls too, we see, we can be together. This is a political maturity that I feel we need to implement, yes. And that is my hope. Finally, hopefully we will be together. I do not want to raise provocation. I only need to state that there is work that we have to do, which we must do urgently; we expedite it. Where we say assistance is needed or the cost is high, perhaps we delay a little. But planning must be done so that all these facilities can be felt and enjoyed by whichever residents, whether in villages, rural areas, urban areas, new villages, and also Orang Asli villages. Thank you. Assalamualaikum WBT.
I want to ask, the one left behind, Sungai Raya, the collapsed road.
A study has been carried out for this one; JKR (Public Works Department) has done it. Insya-Allah we will include it in the project later, in MARRIS, yes. No problem.
Dato' Speaker, one more left behind. My question is, regarding the hanging bridge at Kampung Kurnia Diraja, I found that the bridge is often repaired, but I don't know whether the quality of the timber used does not meet its standard, or the allocation given may be too small, yes. Because recently the village community had to do gotong-royong to fell trees to find suitable timber to replace the timber that has rotted. So I hope that before the hanging bridge can be replaced with a new concrete bridge, it can be informed by which party, this EXCO KPLB, the EXCO for Rural Development. So I ask, please, renew it first, repair it again. Thank you.
I have already gone, already ….
Dato' Dipertua, wait, wait. Later we wrap up together. One more thing, Dato' Dipertua, I would like to invite, yes, what is this EXCO for Rural Development, to come to the Seri Menanti area. There is a road, the village road is full of potholes, the bridge, eh, everything. So I think if the EXCO comes, can we expedite its completion. Please, go ahead.
For everyone's information, my friends on my right and my left. I am saying, usually when I go to any village, three times: the first to get to know the problem, the second when implementation is underway, and the last for success or completion. So this is what I have done. Like in Chembong, I have already gone to see. I have already gone and started, and continued until we succeeded in doing it. I see, yes. So there is no problem actually, yes.
And also regarding the hanging bridge, I have gone to see it, and an allocation we have sent to the Ministry of Rural Development (KPLB) at the meeting of all EXCOs for Rural Development. I think it may be in the process of being approved, for 2.5 million. But I have not said it is approved, yes, it is in process, because basically the paper has been submitted so that, no need to replace the pillars every time, every, whatever it is, whenever there is a flood, it is swept away by, by the water, and must be replaced again. So we say we build a proper bridge, which can provide facilities to many people, about 2,000 people if I am not mistaken. That is the hope we have implemented.
Okay, Honourable Labu.
Ya.
There is one more before the Menteri Besar. Please.
Mr Speaker, first of all I would like to thank Mr Speaker for allowing me to make this winding-up speech, specifically concerning the portfolio entrusted to me in the Second (Budget) Meeting of the Fourth Session of the 14th Negeri Sembilan State Legislative Assembly.
The first issue raised, by the Honourable Member Chennah, concerns the special strategic investment fund. The special strategic investment fund is a special allocation of 2.0 billion ringgit under the Malaysian Investment Development Authority (MIDA) to ensure the country is able to attract investment from companies, world-class companies, yes, mega and strategic projects to locate activities or projects in Malaysia. This is in line with the National Investment Aspirations (NIA), including to compete with other countries in the region, and more developed economies, by offering competitive incentives to attract targeted projects.
This fund is allocated to facilitate the negotiation process to continue attracting strategic projects and mega projects in priority sectors such as semiconductors, digital infrastructure, pharmaceuticals, R&D, transfer technology, smart and many more. This initiative also serves as a strategy to continue encouraging investment in preparation for the implementation of the global minimum tax rate of 15%. The State Government welcomes this and will facilitate potential investors in exploring opportunities to obtain these grant incentives.
The issue raised by the ADUN Rantau and the ADUN Chennah concerns TUNS and TUNS Plus. It is informed that the secretariat of TUNS, namely PKNNS, has begun a study on the effectiveness of the TUNS programme by conducting a survey of TUNS recipients from 2019. The 2019 TUNS recipients were contacted in May 2021 to obtain feedback on the survey questionnaire on the effectiveness of TUNS. The sample was selected randomly from 1,046 TUNS recipients covering all 36 State Legislative Assembly constituencies in Negeri Sembilan. Among the scope measured are the following: the first is the business sustainability after receiving TUNS and the total income after receiving the TUNS grant. The study conducted shows that these TUNS and TUNS Plus assistance initiatives have benefited and increased the sales of these traders.
For the year 2022, the government will look at the impact of these initiatives in more detail, in particular all the initiatives under the State Government such as TUNS, PH GEM and also the free bus service that has been run, so that we can carry out a comprehensive study, and we want to give this task to a third party, yes. At present, for example, TUNS under PKNNS, we want to ask a third party, yes. The third party, namely a neutral party, with permission Mr Speaker, we want to give it to the Negeri Sembilan Foundation Academy College (KAYNS) to conduct a detailed study of what the outcomes, with permission, of the initiatives that have been carried out by this State Government are, in more detail, yes. A sum has already been allocated for 2022 for this purpose, yes.
The third matter raised by the Honourable Member Chennah concerns the management mechanism of TUNS Plus, yes. TUNS Plus, as we are aware, is financing in the form of interest-free easy loans targeted at micro-entrepreneurs in Negeri Sembilan. TUNS Plus offers loan repayment periods from 1 year to 5 years with 3 loan amount options, namely 5,000.00 ringgit, 10 thousand ringgit and a maximum of 15 thousand ringgit. This financing is conceptualised as a revolving fund, where borrowers who take the loan this year will begin repayment next year. This will add to the fund and enable more entrepreneurs to benefit from this initiative from year to year.
Mr Speaker, I would like to refer to the question of the development status of MVV 2.0 raised by the Honourable Member Linggi. I am pleased to inform that the development of MVV 2.0 is proceeding according to the schedule we planned. The development of Malaysia Vision Valley (MVV) 2.0 has been restructured under the administration of the Pakatan Harapan Government through the Comprehensive Development Plan of Malaysia Vision Valley 2.0, which is a catalytic development, yes, or catalyst for the development of Negeri Sembilan. The strategic location of Negeri Sembilan, situated south of the Klang Valley, and the readiness of skilled manpower have long made Negeri Sembilan a natural destination and provided opportunities for investors from within and outside the country. Located adjacent to the country's main international gateway, Kuala Lumpur International Airport, and close to major towns such as Putrajaya, Cyberjaya and Kajang also makes Negeri Sembilan an attractive alternative location to live, in line with the policy of "live in Negeri Sembilan, work in Negeri Sembilan and lifestyle in Negeri Sembilan – live, work and play in Negeri Sembilan", with permission Mr Speaker.
In an effort to improve the long-term economy, namely until the year 2045, the Negeri Sembilan Economic Development Master Plan has been drawn up as a basis to show future growth and development. This Economic Development Plan that has been drawn up is divided into 2 clusters, namely the Malaysia Vision Valley 2.0 Development Plan which outlines 4 main economic drivers: high-technology manufacturing, wellness tourism, with permission Mr Speaker, skills-based education and research, and specialised services. MVV 2.0 is targeted to create a high-impact economy with focus given to the aerospace industry, medical technology, biotechnology, the automotive supporting industry and agriculture.
The overall MVV 2.0 development covers an estimated area of 35 thousand acres. The new development area is divided into several parcels, namely Parcel A – techpark, Parcel B – smartcounty, Parcel C – Negeri Sembilan Aerospace Valley, also known as NSAV, Parcel D – integrated maritime hub and coastal corridor. The conceptual plan for this development was presented to the State Planning Committee (SPC) meeting on 15 December 2020. In addition, Parcel E, with an area of 4,500 acres, is still in the planning phase to be developed as an electric vehicle city hub, yes (EVC), and also unmanned vehicle valley (UVV). We have received requests from interested investors and investors that we consider to be of high quality to invest in EV (Electric vehicle) and also in UVV (unmanned vehicle valley).
Regarding UVV, we will pursue it across all related sectors. The first is UAV (unmanned aerial vehicle), this drone that flies in the air, unmanned surface vehicle (USV), this one on the surface of the water, unmanned underwater vehicle (UUV), this one inside the water, yes, such as a submarine, with permission Mr Speaker, and unmanned ground vehicle (UGV), this one on the surface of the earth, yes, on land, yes. All efforts are being carried out to ensure that development, especially in the MVV 2.0 area, is expedited to ensure local economic spillover is achieved.
Parcel A will be developed as an industrial area, a techpark consisting of 2,838 acres. Among them, it will attract high-technology manufacturing firms to operate in this area. The development covering several of these development parcels is being actively planned and developed together with the development of a new industrial area at Ladang Hamilton, yes. This Ladang Hamilton is located in Nilai, yes, and was launched in October 2021, and is now at the land works stage for plots 1 and 2 with an area of 188 acres. And I am pleased to inform this august House that all the plots of the industrial area have been successfully sold, yes. The next target is to develop a new industrial area, which is to expedite the development of plots 3, 4 and 5, which are now being prepared by the developer, and are expected to be presented for approval of Planning Permission early next year.
For Parcel B, with a total area of 8,796 acres, it is planned for the development of a new town centre or central business district, with permission Mr Speaker, a CBD in Seremban called the smart county. This area will be more easily accessible from Kuala Lumpur International Airport (KLIA) through road links, new road links being developed, as well as the planned rail line. Among the important development components for this area are residential, commercial, regional hub office – regional hub office, with permission, a medical city and light and medium industrial areas that will focus on halal production, particularly those related to F&B – food and beverages, with permission, pharmaceuticals and the cosmetics, cosmetics industry, yes. Based on the conceptual plan that has been approved, the State Government has begun proactive steps to expedite the implementation of Parcel B development.
In line with the State Government's principle of being concerned about the welfare and well-being of the people and the issue of home ownership, therefore the first phase of development in Parcel B will be focused on the development of Affordable Homes (Rumah Mampu Milik) type A valued at 80 thousand ringgit and below, with a comfortable area of 20 x 60 feet, with 3 bedrooms and 2 bathrooms. Based on the planning of the affordable home type category, this Affordable Home type A is expected to be built at about 5,000 units in the first phase of MVV 2.0 Parcel B. We will give priority to the young, especially graduates who are unable to afford to buy a house at this time, in an effort to increase the population and to develop the industrial area in MVV 2.0, especially in Parcel A and Parcel C which are adjacent to Parcel B.
Mr Speaker, Parcel C, Negeri Sembilan Aerospace Valley or NS Aerosmith Valley, with permission (NSAV), with a land area of approximately 16 thousand acres, will focus on the development of the aerospace component manufacturing sector, and subsequently become a hub for aircraft final assembly line (FAL). High demand for new aircraft in the Asian region has opened up the potential to create a new aerospace hub in this region. A feasibility study on the proposed development of the, the Negeri Sembilan Aerospace Valley, which is part of MVV 2.0 development, has been prepared, and this matter has been coordinated with the Federal Government. This feasibility study was carried out by the Economic Planning Unit (EPU) of the Prime Minister's Department, and shows that this development plan is viable and needs to be implemented to enhance the country's economy. Through this study, NSAV is seen to have the potential as an aerospace catalyst that is able to attract investment of up to 104 billion ringgit and create 32 thousand job opportunities by 2039.
Malaysia is well connected by air and sea, which can optimise the advantage of being located on the busiest strait in the world. On average, more than 80 thousand mother vessels, yes, pass through the Strait of Malacca every year, or an estimated 220 mother vessels pass through the Strait of Malacca every day. For that reason, Parcel D is planned as a maritime industrial hub consisting of an upgraded seaport, a home port for coastal ships or cruise ships, or home port for cruise liners, with permission Mr Speaker, lay up bunkering of STS services and others. I would like to inform that lay up is a maritime term, namely where these ships anchor or they park in that area. At present, for a long time, in Negeri Sembilan we have not charged them any fee, and in fact with so many of these ships anchoring at Port Dickson at present, it also invites various other problems, among them pollution because there is no control over their presence anchoring in our waters. Recently the State Government had to bear the cost, yes, of the pollution that occurred.
Therefore, the current government, led by Pakatan Harapan, has taken an unprecedented initiative to establish a lay up area of 2,000 acres where, in this situation, we will ensure that all ships anchor only in this area. They will be charged a fee. And we will also ensure control so that no pollution occurs in this area. This is a step we are taking, which can increase national revenue and at the same time control so that no pollution occurs in our waters.
At present, Mr Speaker, we are cooperating with the Marine Department Malaysia (JLM) and the Ministry of Transport Malaysia to ensure, yes, that this lay up can be implemented. Among the efforts we want to develop within this maritime hub development area is what is called a port base for cruise ships or home port for cruise liners. Mr Speaker, Port Dickson is the best place for us to make it a home port, yes, a port base. So far there is no home port anywhere else in our country. What is happening now is that the cruise ships, or cruise ships, stop with the term said to be a transit port.
A transit port means the ship will stop briefly, about 10 hours, yes, tourists disembark and then board again. The term home port is where tourists who come from across the country board and disembark, yes, embarkation and disembarkation from Port Dickson. Port Dickson is the most suitable in Malaysia because we are located at the closest point to the country's main airport – KLIA. This is the most basic requirement for making an area a home port for cruise liners, yes.
And why do we want to bring a home port for cruise liners? This is to have a major economic impact, yes. Let us imagine, for a large cruise ship, there are 3,000 – 5,000 passengers with 2,000 crew members, yes, perhaps in one ship. They will come through KLIA and will embark and disembark from Port Dickson, yes. Let us imagine the economic impact on our country and local people, yes. They will stay overnight at hotels, they will eat, they may buy necessities, perhaps also buy handicrafts, souvenirs, yes, this happens. This is why we want to establish, yes, a home port for cruise liners at Port Dickson, yes. This effort, yes, will also bring a greater impact, yes. For example, to supply these ships, yes, food, drinks, yes, fuel, gas and so on, yes. This is why, yes, the State Government is very excited to ensure this home port for cruise liners can be realised, yes. At present, God willing, we are in the planning at the early stage for next year, the Planning Permission will be brought forward for discussion, yes, and of course we are looking at all the factors to ensure it complies with all the conditions that have been set, yes.
Mr Speaker, taking into account that Port Dickson, which is located near the Strait of Malacca as the world's main trade route, the State Government sees the potential of Port Dickson as a maritime gateway that can play a role in supporting the industrial activities of MVV 2.0 while strengthening the economy or existing economic activities, yes. The development that we have planned in Parcel C, Parcel A and also Parcel E relating to EVC (electric vehicle city), yes, and also UVV (unmanned vehicle valley) requires support to establish an industrial port to enable us to become a competitive place to attract quality investors to be in Negeri Sembilan.
At the same time, Mr Speaker, apart from the MVV 2.0 heartbeat project, the development of the SME business park at Nilai Impian is also actively in the physical works stage. A total of 127 have been launched and 93 units have been successfully sold so far. So if we look at it, since, Mr Speaker, our efforts have received encouraging response from investors who wish to come to Negeri Sembilan, yes. That is why our policy to make Negeri Sembilan a place to live, a place to work and for lifestyle has received a good response from various parties.
In addition, Mr Speaker, development efforts in the Bandar Enstek industrial area, namely Techpark or Enstek Phase 3 with an area of 650 acres, will be developed by TH Property, where the Planning Permission process is expected to be carried out early next year, yes. All these efforts, this development, is focused on the development of industrial areas aimed at driving the economy of Negeri Sembilan. This effort is hoped to open up more job opportunities, yes, that are of quality, yes, we want to mention here "quality job opportunities". Job opportunities that require knowledge and skills, skill and knowledge, with permission Mr Speaker, yes. This is to ensure better income for the people when they work together in related sectors. Our efforts are to raise the economic standing of the people and provide positive spillover to the local population. This is the effort we are making, yes. These proactive steps of the State Government are seen as the right steps because they will open up job opportunities that are skilled and high-income in moving towards the Shared Prosperity Vision 2030 (Wawasan Kemakmuran Bersama 2030). The State Government itself is striving to bring investment from within and outside the country to Negeri Sembilan through the Multiplier Investment Policy, which targets an increase in the value of investment brought in, which rises from year to year, yes.
Mr Speaker, we are not just talking. In terms of statistics, it has shown that investment in Negeri Sembilan increased dramatically after we took over the government on 9 May 2018. In general, yes, the investment coming into Negeri Sembilan before was only 1.0 billion ringgit, but when we took over, yes, for example in 2017 the investment coming in totalled 1.41 billion ringgit. But in 2018, it increased to 2.86 billion ringgit, yes. And it continued to increase to 6.93 billion ringgit, and in 2020 it increased to 7.93 billion ringgit for the year 2020.
Mr Speaker, although we targeted, yes, for the year 2021, 10 billion ringgit, the COVID pandemic indeed had a major impact on us, yes. 2019, 2020, yes, we could not do work. 2021 continued. That is why we had to reduce the target from 10 billion ringgit for investment to 5.0 billion ringgit for the year 2021. Generally speaking, Mr Speaker, in terms of our policy, yes, this Multiplier Investment policy effort has had a major impact on the economy of the State Government.
Mr Speaker, the State Government remains committed to helping and facilitating, in particular, potential investors in realising the MVV 2.0 development. Thank you Mr Speaker, thank you.
Dato' Yang Dipertua, I beg …..
Ada apa?
The question is from, from Linggi. I would like some clarification from the Honourable Ampangan.
No, is there any question before this one?
Yes. This is indeed my question. Just a little, because, may I? Okay, thank you. Firstly, thank you to the Honourable Ampangan for presenting and explaining the developments of this MVV. If the Honourable Member still remembers, in 2019, the matter I raised at that time was about the Linggi area being part of the MVV, because, because in the previous term, I mean in the year before 2018, this Linggi area was included in the MVV under, under the eco and agrotourism key. At that time I asked a question, if I am still correct, and the Honourable Member said it might be included in the future. But looking at the presentation that was, that, that, that, that, was made just now, Parcels A, B, C, and D, has Linggi now been completely excluded from MVV 2.0? I seek clarification.
Thank you, Honourable Linggi. I still remember the question concerned. In fact, the entire land available to us is indeed large, and it provides, apart from these 35 thousand acres, we still have another 42 thousand acres of land to be developed, which also covers part of the Linggi area. We are very careful not to be too, what is termed as over-ambitious, meaning too much, as if we want to cover everything in order to carry out economic activities but beyond our capacity. That is why what we have planned, in the development in Parcels A, B, C, D and E, is indeed already clear. And we also already have figures in terms of planning for this development. That is why it is not easy for us to state that we want to develop all areas, because the area termed as MVV 2.0 is the Seremban and Port Dickson area. And what we target for development up to 2045 is an area of 35 thousand acres, which relates to what I have informed of, from Parcels A, B, C, D and also E.
However, nevertheless, we will also look at it, because in, if we look at the overall investment that we bring, it is all targeted. First, Parcel A, that relates to the tech park, that we want to go to hi-tech. All the hi-tech industries go there. Then Parcel B, partly to extend what was done by TH Property, namely about to, to create the halal industry, especially in food and beverages, and also about medicine and also about cosmetics. And Parcel B is targeted for housing to support development in Parcel A and also in Parcel C. Where, if Parcel C is more specific, more particularly, that is about the development of aerospace, the aerospace valley. This has been studied jointly, and we, together with the Federal Government, are developing this area. And Parcel D is more about developing a maritime hub to take advantage of the Straits of Malacca. Parcel E, the new one, which is still in our planning to create an EVC (electric vehicle city) and UVV (unmanned vehicle valley), is in another area whose location I do not want to disclose for now.
But however it may be, Honourable Linggi, we will also look at it if there are among the investments or investors who are interested in developing any area near DUN Linggi; we have no problem bringing it together. But so far, in our planning which we have brought to the SPC (State Planning Committee) Meeting, this is what in its entirety has been, has been, has been, has been, which we have brought, yes, which we have drafted, insyaAllah, 2022 will be a year in which much development takes place within the MVV 2.0 area. We do not forget development in the area concerned; I understand in terms of ecotourism and so on, but insyaAllah we will look at this need when, but in terms of our focus, it is on what we have now. Thank you, Dato' Yang Dipertua.
Thank you, Honourable Ampangan and Honourable Linggi. Now I invite the Most Honourable Sikamat. Is anyone outside? Call them in for a moment [most opposition ADUN (state assemblymen) are outside the gallery of the chamber]. The Menteri Besar who is winding up. Please call them. Please, please, please. Chembong, please.
If he is outside, he can hear.
Not calling him in to the chamber.
Mr Speaker, it is all right, Mr Speaker, we will answer quickly today. Regarding the question from the Honourable ADUN Rantau on the collection of revenue up to 31 October 2021. The overall performance of revenue collection as at 31 October 2021 was RM317.02 million or 70.76%. Tax Revenue collected was RM139.12 million or 89.41%, Non-Tax Revenue collection was RM126.82 million, equivalent to 55.02%, and Non-Revenue Receipts were RM51.07 million, equivalent to 82.5%.
The same question from the ADUN Rantau regarding the status of the land ownership policy. The State Government does not set any period for landowners who have been approved a grant of land title to develop the land in question. However, every application approved by the State Department and the Federal Department will proceed with the projects that have been determined to be undertaken.
For the next question, ADUN Rantau, regarding pensioners, the proposal to grant an allowance to government pensioners. For pensioners, whether pensioners in service under the State Government or the Federal Government, the Special Financial Payment (BKK) funded by the Federal Government, as recently announced by the Minister of Finance for government pensioners, the Federal Government will pay BKK to pensioners of RM350.00.
The question from ADUN Jeram Padang: what is the status of the application for the land lot at Kampung Pasir, Seremban, Seremban, which still has not received a response, dragging on for 10 to 15 years ago. The application for the grant of government land was rejected by the State Government on 15 October 2014. There were 2 lists of applicants submitted to the Seremban Land Office in 2017, in which the list of applicants has, has to be harmonised first before being tabled for consideration by the State Government. However, the State Government on 3 August 2011 had earlier approved the reservation of this area as a future development area under the control of the State Secretary. In addition, the area applied for is included within the Kampung Pasir Malay Reserve under Negeri Sembilan Government Gazette number 381/16 July 1987.
ADUN Rantau, regarding the current situation where the employment group receives 35% of CE, 45% to employers. In answering this question, the distribution of compensation to employees, or compensation of employees, to Gross State Product as a whole is low because of a labour-intensive industrial structure. When the economy or industry is labour-intensive, output or production growth will require more workers in the semi-skilled and unskilled categories. When this happens, the rate of salaries and wages will move more slowly, and this contributes to the income gap between household income groups.
Referring to data from the Department of Statistics Malaysia for the second quarter, the second quarter of 2021, those who are employees make up the largest composition in Negeri Sembilan at 80%, followed by employers at 13.5%, self-employed at 13%, and working family members without pay at 4.2%. The majority of the working population in Negeri Sembilan is concentrated in the agriculture and manufacturing sectors, and sectors related to tourism activities such as wholesale and retail trade, accommodation, services and food. The supply of semi-skilled labour in Negeri Sembilan is high compared with skilled and low-skilled labour for the same period; the supply of semi-skilled labour dominates at 58%, while low-skilled and unskilled labour account for 12% and 30% respectively. Semi-skilled workers dominate all five main sectors in Negeri Sembilan, namely agriculture, manufacturing, construction, services, these semi-skilled workers have qualifications at least at certificate level and carry out, and require training to improve existing skills. The COVID-19 pandemic has affected the operation of economic sectors, thereby causing a decline in the salaries and wages received. Among the sectors that contributed to the decline in salaries and wages are property activities, the agriculture sector, and the accommodation subsector and food and beverage service activities.
In addition, the economy of Negeri Sembilan is also underpinned by small and medium enterprises (SMEs), with 98.6% of the total business growth being businesses of micro, small and medium size. Although they are the ones who dominate the total business growth, the contribution of SMEs to key economic indicators such as output value and value added produces a low value of 0.3 per output compared with the national value added of 0.42 per output. This is because the SME sector is labour-intensive, which has important implications for the level of productivity in producing output and value added. This situation would be different if the demand for labour were more for those who are skilled.
The income gap between household groups is also contributed to by the imbalance of development between regions/districts. In an effort to ensure inclusive development so that the benefits of growth can be distributed fairly, UPEN, through collaboration between UPM CS and the Department of Statistics Malaysia, is developing the Negeri Sembilan input/output table as the main reference basis in the preparation of the Eleventh Malaysia Plan... The important thing for the State Government is to formulate a strategic direction based on economic strengths and the District GDP so that the multiply, multiplier effect is also felt by the rural population. Attention will also be focused on the restructuring of the economy by increasing dependence on the modern agricultural sector, which will benefit the rural population in particular. The State Government will study and improve SME and micro business models to achieve sustainable competitiveness and become a catalyst for the aspiration of the existence of demand for services, skilled employment services.
Based on consultation between the government and economic experts, it was found that measuring CE alone does not reflect the true situation of people's income. This is because CE only records those who receive income through salaried employment.
Data shows an increasing trend in people's involvement in informal employment. The labour force participation rate has shown a decline since 2019 and has become more noticeable in the post-pandemic period. Therefore, CE and income from self-employment and informal work need to be measured together in order to ensure that we truly measure the income position of the people in the market. It must be emphasised that more than 75% of people's income comes from the labour market. Income in the form of transfer payments and others only covers around 25%.
Mr Speaker, a question from the Honourable ADUN Chuah. Check, regarding land titles along the coastline. A check by the Port Dickson District Office found that a total of 134 land titles along the coastline of the Port Dickson District have been registered, with a total area of approximately 635 hectares or 1,659 acres. Most of these coastal lands that have been granted title have already been reclaimed, and some still remain as seabed.
ADUN Linggi, companies that have been listed in the Third Schedule. Every application for listing in the Third Schedule under Section 7, Malay Reservations Enactment (Chapter 142) must be submitted to the State Legal Adviser of Negeri Sembilan to obtain comments and consideration of the application received. Among the conditions taken into account for applications such as listing in this Third Schedule are as follows:
The latest company profile in which the members of the Board of Directors and shareholders of the company must be 100% Malay; and
Memorandum and Articles of Association & Constitution which must contain a clause stating that this company is a term, is a Malay company; and
Clause Transfer of Shares must state that shares in this company must be transferred to Malays only or Malay companies only;
34 companies that have been listed in the Third Schedule must be eligible to own land with Malay Reserve status and may develop the land for sale to individuals or Malay companies only.
ADUN Johol, regarding the withdrawal of the customary enactment. The Customary Holders Enactment 2021 will be drafted, allowing Customary Land and Adjacent Land to be developed while maintaining the status of Customary Land and Adjacent Land, as well as maintaining the customary principles that have been practised since time immemorial. This bill will update the old provisions by establishing new provisions, including applications to change the restriction conditions and categories for Customary Land and Adjacent Land, the power of the State Authority to determine or change the restriction conditions for the category of Customary Land, the consolidation of lots of Customary Land or Adjacent Land, the power of the State Authority to approve, surrender and re-grant Customary Land and Adjacent Land, as well as the acquisition of Customary Land or Adjacent Land.
The new provisions above are established so that the affairs of Customary Land and Adjacent Land are in line with current developments. Yes, we, we withdraw it so that we can bring it to the upcoming sitting, and this enactment is withdrawn for the upcoming sitting to be updated and to take into account the results of wider consultation, yes. So, we will receive final feedback and we will, will bring it to the upcoming sitting.
The Honourable ADUN Jeram Padang: the cost of living during the current period. Various assistance has been channelled to reduce the burden on the people from various groups. The budget drawn up is holistic, covering various initiatives for various levels of society. Assistance initiatives in the form of case aid and inputs for agriculture, business, and interest-free micro-credit have also been provided for the year, since 2019. The 2020 budget was drawn up with 2 resolutions to reduce the expenditure burden on the people and to increase families' income-generating capacity. A total of 14 new initiatives were announced, among them the Agro Fund, INGEN, halal cottage and others. The overall initiatives for 2022 amount to RM64.09 million, mainly for the B60 group.
Mr Speaker, the question from Jeram Padang, YB Jeram Padang, regarding the Kampung Pasir lot, Rasah. I have already answered earlier, yes.
YB Chembong. Only one TOL was approved in the DUN Chembong. The revenue collected from the TOL was RM18.00 per year based on the Negeri Sembilan Land Rules.
ADUN Lobak, application for a change of land conditions at a commercial site residence. Applications received in 2020 – 9, in 2021 – 10. This is what MBS approved. Applications approved in the year, applications approved for the year 2020 – 4, in 2021 there were 5 and changed to commercial there was 1. All applications for a change of condition or imposing a condition on land in the centre of Seremban town as commercial were approved in line with the Land Use Zone of the Malaysia Vision Valley Local Plan, there is no single case at the MBS Development Planning Department, yes. The question from the Honourable Tuan Chew Seh Yong, regarding the status of the application to change residential condition to commercial, I have already answered earlier.
The Honourable Tuan Yap, application for a Temporary Occupation Licence (LPS). For the information of the Honourable ADUN Mambau, based on the records of the District and Land Office, Seremban, no current LPS application has been received from any party to operate ponds on the said government land. The said government land involves 4 lots of land that were approved by the State Executive Council Meeting to MBI, dated 30 October 2021. MBI paid the premium on 24 November 2021 to the Seremban District and Land Office. And in process, the Seremban District and Land Office is in the process of issuing and registering the title after receiving the plan from a licensed surveyor.
ADUN Chennah, Non-Revenue Receipts, grants according to the population, receipts from the Federal Government, I have informed you, this is based on Article 109(1)(a). And this we must bring together at the State Government level and also at the Parliament level, yes.
ADUN Pertang, many who have ventured into agriculture because they were laid off from work, yes. A Temporary Occupation Licence of RM10 thousand is imposed on one acre of land, yes. I have checked with the department, yes, with the Jelebu District Land Office, there was not even one case of this happening. So when speaking, let us, with, with facts, yes.
What is the additional royalty obtained by the State Government from the use of the eDoket system – a question from Temiang. The additional royalty from rock material permits obtained by the State Government as a result of the use of the eDoket system in 2021 is RM2.579 million compared with the additional royalty collection in 2020 of RM4.710 million. This decline occurred due to the closure of rock material permit operations as a result of the implementation of the Movement Control Order in 2021.
ADUN Mambau, the developments, I have already answered earlier. Regarding ADUN Chennah, yes, ADUN Chennah. The State Government has never, Mr Speaker, the State Government has never excluded the residents in the opposition state constituencies. For the year 2021, an allocation of RM400 thousand was provided for the welfare benefit of residents in opposition DUNs through 16 DUN Coordinators. These DUN Coordinators have been appointed as liaisons between the State Government and the people in opposition DUN areas to ensure that the policies and agenda of the State Government are clear and understood by them. The State Government also provides equal treatment to all people in opposition DUNs in obtaining any claims, assistance and enjoying the initiatives offered by the State Government, such as the TUNS initiative, assistance for admission to IPTs, Son of the State Scholarship, School Child Assistance, COVID-19 assistance, job loss assistance, orthopaedic implant assistance, assistance to hawkers, victims of natural disasters, fires and others. Without assistance, without, taking into account political ideology.
Mr Speaker, the State Government takes note of the proposal by YB Chennah that allocations also be given to opposition State Assemblymen (ADUN) to ensure that service delivery to the people runs well. As we are well aware, the State Government once provided a small allocation of RM100 thousand to opposition ADUNs through their respective District Offices in the 2019 budget. RM1.3 million or 81.5 was spent out of the total RM1.6 million allocation provided. However, some opposition ADUNs in one previous Dewan sitting rejected the proposed allocation, and the budget proposal the following year. I, together with my colleagues in the State Executive Council, am ready to study the proposal to provide allocations to all the said opposition ADUNs. However, the proposal depends on the capacity of the State Government, the finances of the State Government, considering that next year the State Government is also expected to continue to run a deficit, yes, we have announced a deficit of RM88 million.
Mr Speaker, the question from the Honourable Tuan Noor Azmi Yusof, yes. This has already been answered earlier, asking for 10 thousand earlier, one acre. There is none, yes, there is none, data.
ADUN Johol regarding the MARRIS allocation. The management of MARRIS at this time is much better, more, management, the management of MARRIS at this time is far better compared with before. This is proven when Negeri Sembilan emerged as the state with the highest expenditure performance in Malaysia compared with other states, namely RM455.95 million, equivalent to 132.04%, to implement a total of 1,588 projects in the previous year 2020 compared with the total receipts of RM345.33 million for the benefit of the people throughout Negeri Sembilan. Among the improvements made are the use of four-quadrant analysis to determine the priority of development projects, the development of the Romax 2.0 system and the procurement method by lottery. Negeri Sembilan is also the state that is most active in improving the MARRIS implementation guidelines so that many scopes of work that were previously not allowed can now be implemented under the MARRIS allocation. I am pleased to inform that the selection of MARRIS projects was done carefully and in detail based on the actual needs of the people without taking political sentiment into account. The breakdown of, yes, has, yes, we, we have given it to all the DUNs involved.
ADUN Chembong requested that the State Government explore new areas for increasing income, for example enhancing smart agriculture and the digital economy. The State Government is constantly exploring new sources that can increase State Government revenue. For your information, in line with the development of digital technology, the State Government is studying the feasibility, suitability of terms and conditions, and legal implications in social media monetisation programmes through the creation of content on the social media of State Departments that have the potential to generate revenue. The State Government is also studying the potential revenue through mobilising the shadow economy, the shadow economy which is estimated to have an economic size of 1/3 of GDP, such as micro businesses in residential areas, the sale of food and drinks, and houses and other informal economic activities, in line with changes in economic activity patterns.
ADUN Johol: Negeri Sembilan Tourism Board. The Jom Terojah Negeri Sembilan campaign implemented by LPNS is a platform, a platform for identifying new attractions in, and tourism products suitable for the area. For the Johol area, LPNS has received information about Jeram Lubuk Bunga and Jeram Kampung Betong, under the tourism economy segment. Both locations will be included in visitation and field visit sessions to see the capacity and sustainability of these products if they are developed as new Johol tourist attractions. In addition, LPNS is also in the process of arranging a schedule to hold a filming and video-making session on Johol apam with traditional producers in the area. This information and these details will be used as campaign and promotional material for LPNS through its official social media @Negeri Sembilan Tourism, N9Tourism, covering Facebook, Instagram and Twitter. LPNS is in the final stage of procurement management to print a fun map and brochure, and brochure for tourism covering focused tourism products across all districts of Negeri Sembilan, namely containing a list of names and locations of each tourist attraction product that can be used as a reference for visitors and tourists in Negeri Sembilan. These materials will also be available in hybrid form through print and online digital on LPNS social media by the second quarter of 2022.
The Honourable Palong. The State Government through the District Office is in the process of developing Palong 4, 5, and 6 Town Centre. This effort is undertaken in view of the current unplanned situation, where encroachment occurs with constructions without Town and Country Planning permission, causing floods and other disturbances. This effort will begin by identifying government land around Palong 4, 5 and 6 starting next year. A feasibility study will be carried out in collaboration with local universities.
ADUN Chembong, landowners in Mukim Tanjung Keling. The Rembau District and Land Office has taken action on the complaint from landowners in Mukim Tanjung Keling that stated the issue of land acquisition by the State Government. A check was made at the Department of Survey and Mapping (JUPEM) Negeri Sembilan on 20 October 2021, and a meeting with the complainants and landowners was held on 18 November 2021 to discuss the solution to this issue.
ADUN Lobak, the Parcel Tax rate in flats is to be reviewed. On 15 April 2020, the State Government approved the implementation of Parcel Tax in Negeri Sembilan at the calculation rate that has been determined. The implementation of Parcel Tax in Negeri Sembilan was gazetted as the Negeri Sembilan Strata Title (Amendment) Rules 2020 through NSPU No. 541 dated 19 November 2020 and came into force on 1 January 2021. Based on the Strata Title (Amendment) Rules 2020, the Negeri Sembilan Parcel Tax rate varies according to the ownership status of the parcel's express conditions and districts. There are 2 types of ownership status, namely perpetual ownership or leasehold ownership. For the express status of parcels for residential use, it is divided into 2 types, namely low-cost residential and residential other than low-cost.
For perpetual ownership status, the rate is higher than the leasehold status. For perpetual ownership status, the rate for low-cost residential is a flat rate for all districts in Negeri Sembilan, namely RM12.00 per parcel. For leasehold ownership status, the rate for low-cost residential is a flat rate for each district in Negeri Sembilan, namely RM10.00 per parcel.
The Honourable ADUN Chembong, regarding the proposal that the fixed allowance of the Speaker of the Dewan be increased. The State Government, in the sitting meeting on 28 October 2020 through Meeting Paper No.1849 (2020), approved the proposal for the adjustment of the increase in the fixed allowance of the Yang Dipertua Dewan DUN, Members of the Administration, ADUN of Negeri Sembilan and certain officers under the Members of the Administration and ADUN (Remuneration) Enactment 1980. The proposal for the increase in the fixed allowance of the Yang Dipertua Dewan, Members of the Administration and ADUN was also tabled in the DUN Sitting on 27 November 2020 through Dewan Paper No.6 (2020) and was agreed to, subject to the effective date to be determined later. MMK on 11 November 2020 …..
Dato' Speaker, please say thank you.
….. telah …..
Please say thank you.
The MMK on 11 November 2020 considered Meeting Paper No. 1849/2020 with the aim of postponing to a suitable date in future the harmonisation of the increase in fixed monthly allowances for the Honourable Mr Speaker, the Deputy Speaker, all Members of the Administration and the ADUN.
The House is adjourned …..
Chembong has a question …..
….. I'd remind, there is already Dato' Speaker …..
The House is adjourned …..
Speaker, the House is adjourned.
Speaker …..
….. out of a sense of sorrow.
Dato' Speaker, shorten Dato' Speaker's speech.
ADUN Rantau: pemba, cancellation of sand extraction at the Kampung Linsum mine, collapse of the Sungai Linsum riverbank, gabion method of the Sungai Linggi Flood Mitigation Project, yes, approval of sand extraction along the Sungai Linsum alignment, Kampung Rantau.
Regarding the issue of approval of renewal applications for inland river sand extraction involving Kampung Linsum, Rantau and any approvals along the river alignment, the Department of Irrigation and Drainage (JPS), together with several enforcement agencies, constantly conducts monthly monitoring of operators' compliance, especially with the erosion and silt control plan and the administrative and technical conditions of the department or agency. If it is found that the stipulated conditions have been breached, the State Government will not hesitate to cancel the sand extraction permit.
Regarding the collapse of the riverbank at Kuala Sawah. The heavy rain on 20 October '21 caused a movement collapse of the gabion mattress (bank protection layer) over 62 metres, compared with 15,720 metres that had already been installed by the contractor for the project. Following the analysis by the consultant, extremely high rainfall intensity occurred on that day, reaching an ARI (annual recurrence interval) of 250 years at the time of the event, and the rainfall distribution was beyond normal for the area around the Sungai Linggi alignment. The consultant carried out an analysis of the movement of the gabion mattress section, and rectification works, follow-up rectification, will be carried out by the contractor at the site subsequently. Applicant, the application under the Twelfth Malaysia Plan has already been submitted through the Ministry of Environment and Water (KASA), Rolling Plan 1 and 2, but has yet to receive approval.
For Sungai Timun and Lubok China: Honourable Dato' Seri Haji Awaluddin. For 2021, there were 2 flood incidents at the stated locations, namely on 18 May and 20 October. Floods of this kind were reported as a result of high surface runoff entering the catchment across the whole Rembau District and partly including the Alor Gajah District, whose drainage involves the Sungai Siput flowing into the Sungai Rembau until it overtops the riverbank. This also affects backwater flow, the meeting of the high tides occurring in the Straits of Malacca. JPS hydrological stations also recorded rainfall intensity of up to 191 mm on 20 October 2021. A single extreme reading was received by one area for one day of rainfall record. The flood areas reported by YB Kota have also been listed as Rembau District Flood Hotspot Areas. Continuous notification has been carried out with the MPKK of Kampung Sungai Timun and the MPKK of Kampung Lubok China following each flood event, to give the true picture to the community in the areas concerned, yes.
The State Government has also submitted a proposal paper to the Ministry of Environment and Water (KASA) through JPS for consideration of the application for the Rembau River Basin Management Project to be implemented under the Twelfth Malaysia Plan, given that this river alignment involves transboundary areas between Negeri Sembilan and Melaka.
Honourable Haji Shamshulkahar; YB Serting, regarding flooding in Serting Tengah. This issue was discussed in the JKTD meeting, inclusively with the agencies involved. For short-term action, cleaning and maintenance are carried out by the Department of Irrigation and Drainage and the Public Works Department (JKR). To resolve the long-term issue, the Public Works Department has informed that the application for allocation for drain upgrading at the flood-affected locations for 2022 has been sent to the JKR Headquarters.
Regarding the problem of leaking and burst pipes. Looking at the issue in general regarding leaking or burst pipes, SAINS is aware that leaking and burst pipes are caused by old/dilapidated pipes (asbestos cement), traffic load, natural disasters and third-party works. SAINS's short-term measure for this is to address the issue of leaking and burst pipes by carrying out pipe repairs immediately and controlling water pressure. As for long-term action, replacement of aged pipes will be carried out in phases, depending on the company's financial capacity.
Honourable Dato' Abdul Razak bin Said: question on solving the problem of old pipes, yes, at Kampung Londah and Kampung Ladang, Gemas. It is caused by the 8-inch distribution pipe, which is an old and dilapidated pipe, and SAINS is aware of it. And besides that, the villages at the far end, reticulation from the Gemas Water Treatment Plant, supply disruption usually occurs after scheduled closure maintenance works at the plant. At present there is no water supply disruption in this area.
Honourable Tuan Haji Saiful: solution to the problem of low water pressure in the Kampung Inas, Kampung Dengkel and kampung mi areas, and around Miku. SAINS's investigation found that the cause of the low water pressure in the villages concerned is the suction tank and elevated tank (2 units), which are existing and leaking and are still under the action of the SAINS Asset Unit. And for the time being, the water level has to be lowered due to the leakage. Among the improvement measures to be implemented by SAINS in the near future is installing a 150 mm inlet water pipe alignment over 1.5 kilometres to the surrounding area, in cooperation with Regiment 60 (Bekalan Air) (Water Supply).
Issue, ADUN Seremban Jaya, drain culvert. This road is a Federal Road (FT001). The scope of maintenance work under the concession appointed by the Ministry of Works (KKR), namely on drains and culverts, is 2 rounds a year, but subject to open drains only and not covered ones. The Department's review found that the capacity of the site drain is 900 mm x 900 mm, and the culverts of 2 metres x 2 metres and 1.6 metres x 1.6 metres are sufficient to accommodate runoff water from the road surface only. But because the source of flow from the surrounding development area causes these drains to be inadequate, especially during heavy rain, the application for allocation to upgrade the drains and culverts will be forwarded to the JKR Headquarters for approval.
ADUN Gemas, request for traffic lights at the entrance junction of Taman Desa Permai. The location referred to is the junction of Federal Road (FT001) and Jalan Desa Permai under the Tampin District Council (Majlis Daerah Tampin). JKR will study the need to install traffic lights at the junction and then apply for allocation from the Ministry of Works if warranted, since there are existing traffic lights at the Londah – Pasir Besar road junction (N119), and the distance from those lights to the junction leading to Jalan Desa Permai is less than 300 metres. At the same time, JKR Tampin will take action to improve safety in the area. ADUN Serting, road safety issue, big trees. JKR Negeri Sembilan constantly takes action on trees that are present around Federal Roads and State Roads. Although the trees along the roads are under the supervision of JKR Assets, for 2021 applications for tree felling totalling 1.7 million were forwarded to the JKR Headquarters, but the amount of work approved by the Federal Department was 150 thousand for the Seremban and Kuala Pilah Districts. Meanwhile, applications for tree felling on State Roads totalled 15.765 million and have been approved as in the attachment, akan, as in the attachment. For 2022, applications for tree felling totalling 1.5 million for Federal Roads were forwarded to the Headquarters on 1 September 2021.
Are there many more YBs?
Banyak.
Dondo, dondo, it hasn't gone up yet, has it?
ADUN Gemas, narrow service road to Klinik Kesihatan Gemas. This road, Federal Road FT001, is narrow due to limited land, namely there is an S-band utility pipe and a short culvert. The Department will apply for an allocation to upgrade the junction for implementation in 2022.
ADUN Kota, junction entrance to agricultural road. It has been repaired and can be used.
Linggi: breakwater. The breakwater protects fishing boats from damage. The provision of fishermen's facilities falls under the governance of the Malaysian Fisheries Development Authority (LKIM) under the Ministry of Agriculture and Food Industries (MAFI). JPS has provided technical advisory services and acts as the implementing agency for projects outside non-technical agencies if needed, in line with AP182.
The flood in Pekan Linggi was caused by heavy rainfall, where several JPS hydrological stations recorded readings reaching up to 250 in the upper reaches of the Seremban District and the Sungai Linggi on 20 October 2021. The event caused a rapid increase in flow to the Sungai Linggi and the subsequent meeting of high tides on 21 October 2021, until backflow occurred into the Sungai Solok and overflow into kawa, low-lying areas around Pekan Linggi.
The State Government approved an allocation of P54 River Basin Management under JPS to implement the Sungai Solok Management Project, estimated at 15 million. The consultant will present a concept proposal in December, where, based on the initial analysis, several options can be considered by the State Government. Among them are pemangan gate, pumps, bank improvement works and river widening, raising the Sungai Solok bank and improvement to the Sungai Linggi bank. Presentation and discussion with stakeholders and interested parties in the area are expected to be held in July 2022 to finalise the ownership, the relevant restoration, and consideration for the purpose of channelling the allocation.
However, for short-term recovery, the State Government, through JPS, will continue appropriate river maintenance works to reduce flood risk. Moreover, in 2021, 4 works were carried out involving the Sungai Solok, Sungai Tok Satu, Tok Dua, Tok Alip, the Anak Sungai Pengkalan Durian, and post-flood works valued at 141 thousand.
Regarding the question from DUN Serting, I have already answered. Broga, Chennah's question. On 22 November 2021, Syarikat SAINS together with Air Selangor held a virtual meeting to discuss the application for water source abstraction from Selangor to address the water supply disruption issue in Broga. An agreement was reached for Air Selangor to supply water continuously for 2 years, 0.205 MLD, to SAINS at a commercial rate of RM2.07 per cubic metre. This cost is seen as quite high as SAINS also faces incidental costs such as the cost of meter installation and the Constant Flow Valve and Non Return Valve. Therefore, SAINS has submitted a new application to change from a daily basis to an occasional basis, restricted from Friday starting 3.00 pm to Monday. In addition, we are appealing for new terms at a rate to be determined later.
Linggi, proposal on flash flood problem, Linggi. Already answered earlier. Rasah Kemayan, yes. The Rasah Kemayan water supply system was fully installed by the developer Victory Development for the Rasah Kemayan Golf & Country Township project under the STRATA development system, where maintenance of the water supply system should have been placed under the developer or the joint management body (JMB – Joint Management Body). In 2015, due to the failure of the development project, the State Government directed the Negeri Sembilan Water Supply Department (JBANS), now known as Syarikat Air Negeri Sembilan (SAINS), to take over the water supply system without any takeover process, where no documents or water supply system plans were handed over to the Negeri Sembilan Water Department.
Short-term action:
SAINS has expedited repair works on the burst pipes in the area.
SAINS has also installed PRV at Rasah Kemayan Phase 6, where pipe bursts or leaks often occur. A total of 3 PRV units have been installed. The cost spent was 45 thousand.
SAINS is conducting a pressure management study in the area by dividing Rasah Kemayan into several small zones. In this way, zones can be separated, and problems affecting a particular zone will not disturb the other zones.
Homeowners are advised to install tank and pump systems to provide additional water storage each time a water supply disruption occurs.
For the long term, the whole reticulation system of water supply in Rasah Kemayan, 3.1 kilometres long, needs to be replaced. The proposed scope of work includes replacement of valve pipes and installation of pressure control valves.
ADUN Bagan Pinang: the coastal road in Port Dickson has become a tourist attraction with 1.0 million visitors, and by the end of '21 there is a need for the coastal road to be upgraded. The road upgrading project from Sepang – Teluk Kemang (Route 5), Port Dickson, which is the coastal road of Port Dickson, is indeed a focus of the State Government, being among the priority infrastructure projects in Negeri Sembilan under the Twelfth Malaysia Plan. For that purpose, the State Government has submitted an application to the Ministry of Works under Rolling Plan 3 (RP3) of the Twelfth Malaysia Plan. Acquisition of the main road infrastructure requirements to support the development of Malaysia Vision Valley 2.0. This project is very important for direct access from Port Dickson to KLIA and to ease traffic congestion along the relevant alignment. In this regard, the State Government will liaise and cooperate with the Federal Government to ensure the State Government's aspiration can be realised.
ADUN Juasseh: the road level is increasingly high, caused by repeated village road resurfacing works using MARRIS allocation. For the Honourable Member's information, the issue of village road levels rising due to resurfacing is firstly technical, because road milling work cannot be done as the minimum size of the machinery is 15 mm long and the weight of one machine can exceed 5 tonnes. Therefore, milling work cannot be carried out on village roads. Moreover, existing bridges connecting village roads cannot support the weight of the road milling machine.
For the Honourable Member's information as well, in 2018 widening and shoulder addition works began in several villages in DUN Juasseh, where the original road of 2.7 metres was widened to a maximum of 3.5 metres and to 4.27 metres, on condition that the route obtains the cooperation of village residents and, and with the permission of the landowners involved. In addition, the Department also helps the use of village roads by building passing lanes, as many as possible, to give comfort to the villagers.
As a notice to the Honourable Member, the Kuala Pilah District Office has made every effort to provide the best service in developing the Kuala Pilah District, particularly DUN Juasseh, and to give maximum comfort. This is proven by the fact that from 2018 until 2021, 13.9 million was applied for, applied for by the Kuala Pilah District Land Office and approved by the State Government under the MARRIS allocation.
ADUN Palong: issue of clogged drains in the town centre, unmanaged, smelly and not maintained near the stalls. The foul smell of the drains is caused by food and beverage business premises producing waste that is discharged directly into the drains. Furthermore, the construction of stalls that are no longer operating, built over the drain, has caused the drain to be damaged and clogged and makes it difficult for the concessionaire to carry out drain maintenance work. The Department has applied for an allocation in 2022 of 300 thousand ringgit to upgrade the drain, which will be implemented as soon as the allocation is received. However, the upgrade can only be implemented once the non-operating stalls are demolished and enforcement action against food business premises is completed. So we ask for the cooperation of the ADUN of the area to work together to ensure the stalls that are not in use are demolished. ADUN Lobak, potholed road in Ulu Temiang. The MBS will take note, and in 2020, through MARRIS allocation, insyaAllah.
Question. Thank you for informing us only now that the road has been, resurfaced. Thank you.
Okay.
Thank you, MBS.
ADUN Kota, there are JKR (Public Works Department) patrols on the Negeri roads and village roads during rain. For your information, every JKR Daerah (District Public Works Department) has its own patrol team to ensure that every Jalan Negeri is in good condition and safe for all road users, whether during or after rain.
ADUN Pertang, there are no street lights from Simpang Pertang to Simpang Durian. The location in question is the bend of the Jalan Persekutuan (FT009), namely the Tampin – Kuala Pilah – Manchis road. The JKR has carried out, and will carry out, a study on installing lights at this location, if the departmental warrant will submit an application for an allocation to the KKR (Ministry of Works) for approval of installation in 2022.
ADUN Chuah: there is a lot of rubbish, a lot of rubbish along the Lukut route. I think this has already been answered earlier.
Committee, ADUN Gemencheh, dam. The condition of the upstream area of the Sungai Gemencheh alignment, which is narrow and small, has caused the existing river section to be unable to accommodate the increase in flow capacity. The impact of cleaning activities and clearing of plantations and farms in the upper reaches is also among the causes of the rapid increase in surface runoff into the river. Based on the maintenance records of Sungai Gemencheh for 2020 and 2021, the JPS (Department of Irrigation and Drainage) carried out river channelling work at Kampung Gemencheh Lama amounting to RM67,500.00 in 2020, and 2 quotations for work involving channelling of the downstream section of Sungai Gemencheh amounting to 186 thousand. Checks and investigations at the site have been carried out through the JPS, covering the upstream area of Sungai Gemencheh, based on the incident that occurred involving the dam overflow recently, and the areas where Sungai Jernih and Kampung Air Rawa have been listed for channelling works under the 2022 river maintenance work plan. ADUN Sungai Lui, the matter of sand has already been answered earlier. ADUN Serting: Serting Hilir Kompleks, the problem of leaking and burst pipes at Serting Hilir Kompleks. Looking at it generally, regarding leaking pipes in the SAINS area, it is well known that leaking and burst pipes are caused by old, ageing pipes, which we always say. SAINS' short-term step to address leaking pipes is to carry out pipe repair work immediately and to control water pressure, yes.
SAINS' outstanding debts: ADUN Gemencheh. Every month SAINS allocates RM5.0 million from its collections to pay 185 contractors and suppliers, even though it faces constraints on collection of revenue from consumption due to the COVID-19 pandemic. Some of these problems occur due to delays by contractors and suppliers in completing claim documents and submitting them to SAINS for payment to them. However, SAINS continues to strive to make payments to every contractor and supplier every month without delay.
ADUN Senaling: the NRW (non-revenue water) in Kuala Pilah is high, and there is disruption to the water supply in Kepis, yes. The high NRW in Kuala Pilah at present is due to the pipeline alignment, yes, which we are aware of. For the short term, the activities to be carried out are reducing NRW in Kuala Pilah, including installing 3 PRVs (Pressure Reducing Valves), detecting and repairing leaks, and replacing communication pipes. The replacement of old pipes will be done in phases, depending on the company's capacity.
As for the problem at Felda Kepis, due to unusually heavy rain that caused the river water to rise, sand and mud entered the pump chamber and caused the pump to be damaged. Therefore, the plant had to be shut down until the river water receded and the pump could be repaired. The State Government understands the difficulties faced by the parties involved and by SAINS with the increase, therefore the State will always cooperate and provide advisory services to SAINS management to ensure efficient governance.
Disruption to the water supply in the Pertang area due to pumps that frequently break down at the Lakai Water Plant: ADUN Pertang. The disruption to the water supply at the LRA Lakai plant, Jelebu, is not only due to pump damage. Rather, the starter pump disruption that occurred on 1 October 2021 was caused by a TNB voltage drop, which resulted in damage to the soft starter. However, in the problematic condition, the plant still operated with 2 pumps and one on standby. Every SAINS water treatment plant has a periodic schedule for pump maintenance work to ensure pump breakdowns can be minimised.
ADUN Chembong: the riverbank collapse at Kampung Air Panas, Pedas, Seri Melenggeng, Kampung Solok Jelawai, yes. We are aware that the riverbank collapse in question occurred on 25 May 2021. Following the flood incident in 2021 that was also raised, the JPS has carried out a review and submitted an application for work to repair the structure of the MTB (medium traffic bridge) and the Seri Melenggung, Melenggang 1, Kampung Solok Jelawai road, which crosses the stone-laden Sungai Batu Hampar, with an estimated requirement of 160 thousand, using the MARRIS allocation.
ADUN Rahang, yes: the Sungai Linggi causing floods. The State Government, through the JPS, constantly monitors the condition of Sungai Linggi during heavy rain. Several actions were taken in 2021 by carrying out construction of rubber walls at Taman Happy and Kampung Dato Mansor to prevent overflow of the river in the
area. River cleaning works were also carried out, and ensured that the water and river flow ran smoothly without any obstruction. This year, the JPS has spent RM115,550.00 on the implementation of the said maintenance works.
ADUN Pertang: regarding TNB, the road link from Jelebu to Pahang, street lights. This has already been answered. ADUN Chembong: the issue of frequent electricity supply disruptions at DUN Paroi, Taman Tuanku Jaafar Phase 3. The electricity supply disruption that occurred on 29 November 2021 at 2:35 a.m. is referred to. The disruption was caused by damage to the main cable and the cable to Taman Tuanku Jaafar Phase 3, so that a generator had to be used to supply power. Supply was fully restored through the main cable after it was repaired. TNB will always strive to carry out maintenance work so that electricity supply disruptions can be minimised.
Okay, regarding tourism. ADUN Kota: suggested Gunung Datuk earlier, yes, in collaboration. For your information, Honourable Member, the Gunung Datuk Eco Forest Park is one of the main hiking destinations in Negeri Sembilan. The management of the Gunung Datuk Eco Forest Park is now fully under the supervision of the Negeri Sembilan Forestry Department (Jabatan Perhutanan Negeri Sembilan). According to records, Koperasi Gunung Datuk Rembau Sdn. Bhd. was granted a usage permit by the Negeri Sembilan Forestry Department to manage all camping, catering, shop and other facilities, including chalets, from 2013 to 2018. The usage permit has been terminated, the agreement period has ended, and the management issues that arose during the permit period. Accordingly, the State Government decided that the Forestry Department should take over the management of the Gunung Datuk Eco Forest Park in full. The Negeri Sembilan Forestry Department, together with the Rembau District Council, has planned several development projects to upgrade the infrastructure and basic facilities for visitors' comfort, and to diversify activities as new attractions for visitors to the Gunung Datuk Eco Forest Park, yes. So we are currently in the process of further improvements, and insyaAllah after that we can discuss how.
Regarding the question from ADUN Juasseh: the Ulu Beting waterfall. For your information, Honourable Member, the Jeram Ulu Beting waterfall area in question is actually the Kampung Betong waterfall, which is located in Compartment 12 of the Johol Forest Reserve and close to Kampung Betong, Johol, yes. I think I have answered this earlier. And insyaAllah we will look at its suitability for making it a new tourist area.
Car parking at tourist hotspots, this is from ADUN Bagan Pinang, which I have answered. ADUN Chembong regarding the road at, at what, at the Gerobok Salai area. Action has been taken on the work, noted.
Puan Mary Josephine requested the State Government to look at the tourism potential of Kampung Baru Rasah. The Seremban City Council (MBS) is currently focusing on developing local tourism in the Seremban District through the development of Cultural Mapping and training of local tour guides. Through this Cultural Mapping, a Heritage Trail Map will be created for tourists to explore its uniqueness. In the DUN Rahang area, MBS is developing a beautification product for the old railway line of Kampung Chedang, using allocations from the Ministry of Tourism, Arts and Culture (MOTAC) and the Ministry of Housing and Local Government (KPKT). And the State Government's allocation will add value to the Cultural Mapping that is being carried out.
For the question from Bagan Pinang, regarding upgrading infrastructure facilities in Port Dickson. The Port Dickson Municipal Council (MPPD) is always planning to upgrade and improve the infrastructure and tourism facilities in Port Dickson. For 2021, under the P62 allocation, 8 development projects were implemented involving an allocation of RM1.424 million, yes, which was spent on upgrading tourist areas in the Port Dickson District. DUN Johol, I think, yes, we have answered. And the last one is regarding the religion of Islam. Just a little more. The Seremban Jamek Mosque, from YB Loke Siew Fook, development and improvement of the Seremban Jamek Mosque. This mosque has waqf status and has been recognised as a heritage building under the Heritage Act 2005 (Act 645). Therefore, before carrying out any repairs, the Negeri Sembilan Islamic Religious Affairs Department (JHEAINS) must first refer to the Negeri Sembilan Islamic Religious Council (MAINS) and the National Heritage Department (JWN), yes.
the condition of the cemeteries, which is disorganised and requires a guideline. The Negeri Sembilan Islamic Religious Affairs Department (JHEAINS) takes note of the disorganised cemeteries in the kariah areas and is implementing several initiatives to coordinate and ensure that Islamic cemeteries can be managed and administered properly. Accordingly, a guideline named the Negeri Sembilan Islamic Cemetery Management Guideline (Maqrabah Salimah) has been issued. The Islamic Religious Affairs Department also cooperates with PLANMalaysia to prepare grave layout plans for newly opened Islamic cemeteries. The Islamic Religious Affairs Department
also collaborates with the Negeri Sembilan Mufti Department to ensure the accurate qibla direction for every Islamic cemetery. So far, 3 Maqrabah Salimah have been built, namely in Seremban, Rembau and Kuala Pilah. It is hoped that all Islamic cemetery management at mosque kariah areas can use this guideline to ensure the orderliness of the Islamic burial grounds can be achieved.
Bagan Pinang: Islamic cemeteries. According to the latest records on the use of burial land in Bagan Pinang, the usage percentage is 56.25% and the remaining usage is 43.75%. The Port Dickson cemetery at Taman Intan Perdana is still large and able to accommodate bodies over a long period. However, the Islamic Religious Affairs Department, together with the Port Dickson District and Land Office, will continue to be committed to identifying a suitable site for an Islamic cemetery in the DUN Bagan Pinang area.
Palong: Masjid Palong. The Negeri Sembilan Islamic Religious Affairs Department takes note of the need to repair mosques throughout Negeri Sembilan. There are 301 mosques and 1,020 surau that require attention from the government. Therefore, the Islamic Religious Affairs Department has to implement maintenance projects using the P63 development budget based on priority. As an example, Masjid Palong 6 was previously subject to work replacing the roof and repairing the slab amounting to 147 thousand in 2017. The work to build a new toilet at Masjid Felda Palong 2 amounted to 68,973.00 in 2019. And the work to build a new body management room and replace the dome at Masjid Felda Palong 4 amounted to RM169,142.00 in 2020. The Islamic Religious Affairs Department is also of the view that FELDA management also needs to work together to help the State Government maintain the mosques/surau located within the GSA land. The Islamic Religious Affairs Department will always strive to ensure that all mosques are given due attention in order to ensure the comfort of the congregation.
ADUN Chembong: burial grounds. The Negeri Sembilan State Mufti Department takes note of the issue of inaccurate qibla involving mosques, surau and Islamic cemeteries in Negeri Sembilan. In this regard, the State Mufti Department, Negeri Sembilan State Government, through the Falak Unit, goes to the sites every day to carry out qibla direction detection work based on applications.
Sungai Lui: extremist groups. The Negeri Sembilan State Government, through the Negeri Sembilan State Mufti Department, has carried out
strategic planning in addressing the issue of extremist groups and deviant teachings. The Mufti Department will review and build profiles of preachers suspected of spreading extremist and deviant teachings. Preachers who hold a licence and are suspected of violating licence regulations will be called in to provide explanations and be given advice. If they repeat it, action to withdraw their teaching permit will be taken against them. For religious talks without permission, information will be channelled to the Negeri Sembilan Islamic Religious Affairs Committee for further action. For deviant groups that have assemblies, a thorough investigation will be carried out on this group based on public information with the assistance of the Special Branch Unit of the Royal Malaysia Police (PDRM). Once evidence of deviation is confirmed, an extract of the minutes of the Fatwa Meeting will be made for the purpose of issuing a fatwa, and then legal action, raids and arrests will be carried out by the Negeri Sembilan Islamic Religious Affairs Department.
A total of 11 preachers are under monitoring. A list of teachings that contradict the teachings of Ahli Sunnah Wal Jamaah has also been uploaded for public reference on the website of the Negeri Sembilan State Mufti Department, including its official social media. The Negeri Sembilan Mufti Department also implemented 9 programmes called "Banteras Ajaran Sesat" this year by going to communities such as mosques and surau to provide explanations and descriptions of the characteristics of deviant teachings. With this explanation, the community indirectly becomes the eyes and ears of the authorities, providing information to the authorities for action to be taken.
ADUN Kota: assistance for orphans. For the year 2020, 2022, the Negeri Sembilan Islamic Religious Council allocated RM1.1 million for the management assistance of orphans and the poor in Negeri Sembilan, where the list of such orphans will be obtained from the Mosque Kariah Committee.
ADUN Kota: laws touching on Islamic religious affairs need to be made more seriously, and this matter needs to involve ADUNs who are Muslim. Pen, the initial drafting of a Bill touching on Islamic religious affairs involves all implementing agencies under the auspices of the Negeri Sembilan Islamic Religious Council, namely the Negeri Sembilan Islamic Religious Affairs Department, the Syariah Prosecution Department, the Mufti Department and the Negeri Sembilan Syariah Judiciary Department, and under, under the State Executive Council, and then brought to the DUN sitting to be debated and passed. ADUNs who are Muslim have the opportunity to
scrutinise and debate every matter in the Bill that touches on Islamic religious affairs that is submitted, and to make any amendments at both stages. However, as an improvement, all Muslim ADUNs may be involved from time to time before this Bill is pa, brought.
Issue of the Teluk Kemang Religious School: ADUN Bagan Pinang. The Teluk Kemang Religious Secondary School received an allocation of RM1.49 million for the period 2016 to 2021, involving facility maintenance and new construction work, including building a new teachers' room, upgrading and refurbishing the living skills building, upgrading the academic building, student toilets, canteen and hostel. The maintenance allocation for this school is through the state development expenditure allocation P63 and the Federal allocation.
ADUN Kota proposed guidelines for the management of graves. I have answered earlier, okay. Thank you, Dato' Yang Dipertua.
Thank you, the Most Honourable …..
Dato' Yang Dipertua …..
Sikamat.
….. there is …..
Enough, enough, enough, there are no more questions. The question session is closed.
There is, there is, it is not a question. What, what, what was raised has not been answered yet, that is all.
Apa?
This is a proposal: whether the additional initiative for the Orang Asli community to repair houses will be considered or not.
That, we, I said earlier this morning that through the Islamic Religious Council we have built houses for Orang Asli villages, and we also coordinate with NGOs, yes. So, we feel that, we feel that from time to time we will work with the Department of Orang Asli Affairs (JHEOA) to determine. We cannot, because we do not yet have the, the, we do not know the total amount required, yes. We do not want to just mention it, but tomorrow we will not be able
to implement it. So for that, we also have NGOs that work with the State Government to build houses to meet the needs of the Orang Asli, yes.
Thank you, the Most Honourable …..
The Honourable Dato' Speaker.
….. Sikamat.
The Honourable Dato' Speaker.
No, no. I want to proceed now.
My question has not been answered.
There are no more questions.
My question has not been answered.
What question was not answered?
I seek clarification on the law the other day …..
Undang? Okay.
….. in the debate relating to the source of legal power …..
Okay, Honourable Member, okay. That's okay. Regarding the ADUN Senaling, the State Government has brought this matter before the National Land Council (Majlis Tanah Negara) at its 75th meeting on 2 August 2019, in accordance with the decision of the 64th National Land Council meeting. The 75th National Land Council has noted that the State Government in principle agrees and is satisfied that the decision to convert land tenure from leasehold to freehold in perpetuity, which is an offer of Pakatan Harapan Negeri Sembilan, is included within the interpretation of special circumstances in accordance with paragraph 76(aa)(iii) of the National Land Code (Act 828). The 75th National Land Council has noted that the Negeri Sembilan State Government is aware of the Federal Director-General of Lands and Mines Circular No. 1/2018 entitled Decision of the 73rd National Land Council on Alienation of Land in Special Circumstances for Perpetual Tenure under Section 76(aa)(iii) of the National Land Code. Based on the National Land Council's acceptance that the Negeri Sembilan State Government may make a decision to convert the tenure period of land titles from leasehold to perpetuity in the Negeri Sembilan Darul Khusus for residential land, which is an offer of Pakatan Harapan, is included within the interpretation of special circumstances and guided by the said Circular KPTG 1/2018. The Director of Lands and Mines of Negeri Sembilan has issued Circular 1/2020 on the policy guidelines for implementing the conversion of the tenure period of land titles from leasehold to perpetuity in the Negeri Sembilan Darul Khusus for residential land. Accordingly, the implementation of the conversion of the tenure period of land titles from leasehold to perpetuity in the Negeri Sembilan Darul Khusus for residential land has been carried out in accordance with the law in force. Thank you, Dato' Yang Dipertua.
Thank you, Honourable Sikamat. Honourable Members, the Negeri Sembilan Development Estimates Motion 2022 and the Supply Bill (2022) 2021 have been debated and responded to by the government. Honourable Members who agree with the Negeri Sembilan Development Estimates Motion 2022, please raise your hands. Those who disagree? Those who abstain? The motion is carried.
[Voting result: all 19 Honourable Members on the government side agreed, 2 Honourable Members on the opposition side abstained, and 12 Honourable Members on the opposition side did not vote. YB ADUN Juasseh was not in the Chamber Gallery when the vote was taken]
Honourable Members who agree that this Bill be read a second time, please raise your hands. Those who disagree? Those who abstain? This Bill is read a second time.
[Voting result: all 19 Honourable Members on the government side agreed, 2 Honourable Members on the opposition side abstained, and 12 Honourable Members on the opposition side did not vote. YB ADUN Juasseh was not in the Chamber Gallery when the vote was taken]
A Bill entitled An Enactment to apply a sum of money out of the State Consolidated Fund for the services for the year 2022 and to appropriate that sum for specific purposes for that year.
Dato' Yang Dipertua, I rise to propose that the House sit in Committee and that this Bill be considered clause by clause.
Labu.
I support the proposal.
Honourable Members, those who agree that the House sit in Committee and that this Bill be considered clause by clause, please raise your hands. Those who disagree? Those who abstain? The House sits in Committee.
[Voting result: all 19 Honourable Members on the government side agreed, 2 Honourable Members on the opposition side abstained, and 12 Honourable Members on the opposition side did not vote. YB ADUN Juasseh was not in the Chamber Gallery when the vote was taken]
[The mace is lowered]
[The House sits in Committee]
Okay.
Fasal 1.
Honourable Members, is there any objection? If not, Clause 1 shall form part of the Bill.
Fasal 2.
Honourable Members, is there any objection? If not, Clause 2 shall form part of the Bill.
Jadual.
Honourable Members, is there any objection? If not, the Schedule shall form part of the Bill.
Honourable Dato' Yang, Chairman, I request to propose that the Bill be submitted to the House.
Yang Dipertua, yang, Honourable Dato' Pengerusi, I rise to support this proposal.
Honourable Members, the Supply Bill (2022) 2021 is now put to the House. Honourable Members who agree, say "agree". Those who disagree, say "disagree". No, there are none, yes. The ayes have it. The House resumes.
[The mace is raised]
[The House resumes]
[Third reading]
Dato' Yang Dipertua, I rise to state that the Supply Bill (2022) 2021 has been considered clause by clause and has been agreed to without amendment. I therefore propose that this Bill be read a third time and passed.
Dato' Yang Dipertua, I rise to support that proposal.
Honourable Members, those who agree that this Bill be read a third time and passed, please raise your hands. Those who disagree? Those who abstain? This Bill is read a third time and passed.
[Voting result: all 19 Honourable Members on the government side agreed, 2 Honourable Members on the opposition side abstained, and 12 Honourable Members on the opposition side did not vote. YB ADUN Juasseh was not in the Chamber Gallery when the vote was taken]
Supply (2022) 2021 Enactment. Enacted by Yang Maha Mulia and the Undang of the Four, together with the Tengku Besar of Tampin, with the advice and consent of the State Legislative Assembly (Dewan Undangan Negeri).
Second BillBill
Adat Land Tenure Bill 2021.
Item five, Second Bill: Adat Land Tenure Bill 2021.
Dato' Yang Dipertua, referring to Standing Order XXIV, Order 26, I respectfully request to withdraw the proposal for the Adat Land Tenure Bill 2021.
Honourable Members, the Bill is withdrawn.
Adjournment of MeetingAdjournment
I wish to adjourn our sitting this evening, and I will not speak at length because Asar time is nearly over, yes. So I thank both sides of the Honourable Members. Ha?
[off-mic conversation]
Never mind, allowances will not go up, we will raise salaries, insyaAllah, for everyone. Okay, we adjourn our sitting this evening. Thank you very much, wabillahitaufikwalhidayah, assalamualaikum wbt.
[The sitting was adjourned at 6.09 p.m.]