Negeri Sembilan · 8 December 2025
15th Assembly, 3rd session, 3rd meeting (Budget) · 151 turns · 28,657 words · official PDF ↗ · Digital Hansard ↗
ExperimentalNegeri Sembilan publishes one PDF per meeting, naming speakers by seat. The 15th Assembly was dissolved on 5 Jun 2026; the 16th (elected 1 Aug 2026) has published nothing yet. Written answers are not published.
(Opening)
Peace be upon you (Assalamualaikum WBT) and greetings of wellbeing.
Prayer Recitation
Honourable Dato' Yang DiPertua Dewan. Order of the Meeting, Item One, Recitation of Prayer.
[The Clerk of the House recited the prayer under Rule IX, the Standing Rules and Orders of the State Legislative Assembly]
Message from the Speaker of the House
Item Two, Message from Honourable Dato' Yang Dipertua Dewan.
Assalamualaikum WBT. Bismillahirrahmanirrahim, Alhamdulillahhirabbil'alamin wassolatu wassalamu'ala asrofil ambiya iwalmursalin wa'ala alihi wasohbihi ajma'in. Rodhitu billahi robba, wabil islami diina, wabimuhammadin nabiyya warosuula.
Alhamdulillah, all praise is due to Allah, Lord of the Universe. Blessings and peace be upon the Prophet Muhammad SAW, his family and his companions. The Most Honourable Dato' Seri Haji Aminuddin Bin Harun, Menteri Besar Negeri Sembilan, the Honourable Members of the State Executive Council, the Honourable Members, Heads of Departments, Dato'-Dato', Datin-Datin, Gentlemen, and Ladies, distinguished guests all. Alhamdulillah, I take this opportunity to extend a warm welcome to the sitting for the Third Meeting (Budget), Third Session of the 15th State Legislative Assembly (DUN) of Negeri Sembilan.
Today, 8 December 2025, is the second day of the meeting. Here, I wish to inform you of the absence of the Honourable ADUN Rantau, who cannot attend today, 8 December 2025, because he needs to attend a meeting on the Cambodia border dispute, the Cambodia-Thailand demarcation. I also wish to inform you that the Malaysian Communications and Multimedia Commission, Negeri Sembilan Office, will open a complaints counter on Level G, State Legislative Assembly Building, for two days, on 8-9 December, to enable the Honourable ADUN to channel issues on broadband access and network facilities in their respective state constituencies. I hope all the Honourable Members can take part in raising issues on broadband access facilities in their respective state constituencies, Honourable Members. As is known, the debate session will begin today. I very much hope all the Honourable Members can take part in the budget debate and subsequently give opinions that can improve the quality of government delivery to the people of Negeri Sembilan in particular.
Gentlemen, as usual, I wish to call upon all present to always abide by the Standing Rules and Orders of the House as well as the code of conduct and ethics as Honourable Members throughout the meeting. I seek the cooperation of all present to ensure that our meeting this time runs smoothly and successfully. Thank you. Good sitting.
Questions — Questions Requiring Oral Answers (Second Day)Questions
Item Three, questions. Questions Requiring Oral Answers, Second Day.
I invite anyone to put forward a question for Rantau.
With your permission, Dato' Yang Dipertua, on behalf of Rantau I ask question number 1.
Thank you, Dato' Yang Dipertua, thank you ADUN Rantau, and thank you ADUN Kota who represents the Honourable ADUN Rantau. The question from ADUN Rantau: What are the plans and strategies of the State Government to ensure every citizen of Negeri Sembilan can manage their daily cost of living, and list them by specific cluster including basic food, income, education, health, housing and public utilities.
Dato' Yang Dipertua, the State Government takes note of the grievances of the people regarding the cost of living, alongside the plans and strategies that have been implemented by the Ministry of Domestic Trade and Cost of Living (KPDN) to balance the prices of goods that have to be borne by the people due to the high cost of goods and services.
The State Government, through the 2025 budget tabled on 20 November 2024, also gave attention to initiatives that are believed to be able to balance the needs of living and the strengthening of the economy so that it remains resilient and has resilience.
In my budget, I stated that the increase in the price of our goods is controlled. Among the assistance and initiatives announced by the State Government in the 2025 budget, to help overcome the rising cost of living in specific clusters, including basic food, income, education, health, housing and public utilities, are as follows. Firstly, in the basic food cluster, starting from 2022 the State Government announced an allocation of 5 million to carry out the Nismilan Prihatin sales initiative, namely the sale of basic necessities such as chicken, eggs, cooking oil, vegetables and meat at prices up to 30% lower than market prices. This programme has received very encouraging response across all state constituencies every week. For this reason, a total of 2 million has been allocated in 2025 to continue the Nismilan Prihatin sales. For the income cluster, the Tabung Usahawan Negeri Sembilan (TUNS) is a grant-based financing assistance of RM3,000 targeted at hawkers and small traders in Negeri Sembilan. The main objective of establishing TUNS is so that more entrepreneurs at this scale can be created through this initiative. In addition, it is also hoped that the assistance can improve the existing businesses of entrepreneurs so that they can rise to a better level than before. TUNS can also indirectly open up more employment opportunities while helping to stimulate economic growth. From 2019 to 2024, the Negeri Sembilan State Government has allocated a total of 19 million for initiatives that have been utilised by 6,459 hawkers and small traders in Negeri Sembilan. Through the Negeri Sembilan Budget 2025, themed "Bersama Membina Negeri Madani", the State Government agreed to continue the TUNS initiative for the 7th year this year with an allocation of RM3 million.
The Negeri Sembilan entrepreneur empowerment programme, NS Choice, is an entrepreneur empowerment programme aimed at improving product quality, branding, certification, and packaging. A total of 30 Micro Enterprises and Micro, Small and Medium Enterprises (PMKS), covering various entrepreneurial products, have been selected as participants in the first phase of NS Choice. Among the products are food and ready-packaged business products, clothing, perfume and also health products. Entrepreneurs who have received guidance and product improvement will be showcased as iconic products under the name NS Choice. NS Choice is a label and symbol that recognises quality products from Negeri Sembilan. The Negeri Sembilan entrepreneur empowerment programme NS Choice is continued in 2025 with an allocation of RM500,000. The "Halal Cottage" initiative is continued in 2025 with an allocation of RM500,000 to empower ("empower") micro-entrepreneurs in complying with the principle of halalan toyyiban that exceeds the halal certification standards set by the government, such as premises cleanliness, and the quality of equipment and tools used. This effort has been able to expand their business markets even more widely. The number of entrepreneurs who have received this initiative is as follows: in 2022 there were 102 recipients, 2023, 101 recipients, and 2024, 103 recipients.
The fourth is a joy contribution of RM200 ringgit to senior citizens aged 70. Senior citizens have been assisted through a joy contribution of RM200 ringgit each, for senior citizens aged 70 and above, with an estimated allocation of RM14.8 million. A one-off contribution of RM200 each for single mothers earning below RM2,000 ringgit a month. Single mothers earning RM2,000 a month received a one-off contribution of RM200 ringgit each through an allocation totalling RM1.2 million. For the education cluster, firstly the child assistance initiative. Bas… N9Bas. The N9Bas assistance initiative is a cash aid of RM50 ringgit a month for children from the B40 group, which began to be implemented since 2019. For this, it is only continued in 2025 with an allocation of, it is continued in 2025 with an allocation of RM1 million ringgit, which will benefit 1,800 students.
Secondly, the Child of the State Assistance Initiative (N9BAN), Assistance for Tahfiz Schools, SJKT, SJKT and Private Schools. To nurture the culture of knowledge, two initiatives are continued in 2025, namely the Child of the State Assistance Initiative (N9BAN) with an allocation of RM800,000 ringgit and Assistance for Tahfiz schools, SJK(C), SJK(T) and private schools with an allocation of RM2 million ringgit. Mobile device assistance, thirdly, mobile device assistance for form six students and above, RM3.35 million has been allocated for mobile device assistance for form 6 schools and above. The total number of mobile device recipients up to 2024 is as follows: IPTA, 510 laptop units. Form 6, tablets, 500 units, and God willing next year we will change it, for form 6, we will also give laptops. In addition, we also provide a "SIM Card" to all form six students across Negeri Sembilan.
Fourthly, the Cost of Living Scholarship Scheme for IPTA, RM3.6 million has been allocated for the Cost of Living Scholarship Scheme for IPTA students. Fifthly, a special initiative for encouraging excellence in SPM, STPM and STAM, RM100,000 ringgit has been allocated for the special SPM, STPM and STAM initiative. Sixthly, interest-free education loans for postgraduate Master's and PhD students at IPTA, and RM1 million has been provided for interest-free education loans for students at Master's and PhD level at IPTA. Seventhly, the TVET-KYNS student assistance initiative, RM5.25 million has been allocated for the TVET-KYNS assistance initiative.
Eighthly, the hostel of Sekolah Menengah Agama Chuah. The State Government is very concerned about the constraints faced by the management of Sekolah Menengah Agama Chuah, Port Dickson, which is unable to accommodate the ever-increasing intake of new students every year compared to its capacity, which can only accommodate 50 students. Therefore, the State Government agreed to allocate RM7 million for the construction of two hostel blocks, one dining hall and one canteen block at Sekolah Menengah Agama Chuah, with an implementation period of two years. Accordingly, RM100,000 is allocated in 2025 for the implementation of preliminary works. This initiative is also intended to help family institutions reduce the cost of living, involving 24 students who have to travel back and forth to school every day from homes that are far away.
The health cluster: assistance for the procurement of orthopaedic implants. An allocation of RM500,000 ringgit has been provided for 2025. And secondly, assistance for surgical treatment of AB Fistula for haemodialysis treatment, an allocation of RM500,000 ringgit has also been provided for 2025.
For the housing and public utilities cluster, maintenance of private low-cost and low-medium cost flats across Negeri Sembilan, the State Government focuses on efforts to ensure every flat is occupied in good and safe condition for habitation. The State Government is very concerned about the problems faced by the Joint Management Department (JMB) in private flats, especially issues of maintenance, cleanliness, safety and inadequate infrastructure. Therefore, focus is given to addressing these needs by providing the allocation required to improve facilities and enhance their quality of life.
This initiative continues in 2025 with an allocation of RM2 million ringgit. The Rumah Harapan Programme, to meet and give more opportunities to the people to own a home, the Government introduced the Rumah Harapan Rakyat Programme in 2021. This scheme provides interest-free loan facilities for houses valued at
RM75,000 ringgit to B40 group members who still do not own a house and wish to build 31 single-storey bungalows on their own land. From 2021 to 2023, a total of 167 houses have been completed and handed over to participants, while 41 have been approved for 2024. The Rumah Harapan Rakyat initiative continues for 2025 with an allocation of RM5 million ringgit.
Thirdly, upgrading and maintenance works for industrial areas in Seremban, Port Dickson, Jelebu, and Tampin to further encourage the development of small and medium enterprise (IKS) industries, RM1 million ringgit has been allocated for upgrading and maintenance works for industrial areas in Seremban, Port Dickson, Jelebu, and Tampin. Fourthly, upgrading works for sports facilities, public infrastructure, entrepreneur plazas that have a direct impact on the community. The Government has allocated RM510,000 for small projects involving upgrading works for sports facilities, public infrastructure and entrepreneur plazas that have a direct impact on the community.
The assistance and initiatives provided by the State Government under this 2025 budget are among the continuous efforts and commitment of the State Government in improving the living standards of those in need so that they can enjoy a better and quality life and thereby make those groups more capable and productive. At the same time, the State Government, through the Ministry of Domestic Trade and Cost of Living, Negeri Sembilan (KPDNNS), implements various programmes to overcome the burden of the people's cost of living. Under the basic food cluster, KPDN implements the Jualan Rahmah Madani programme which offers basic necessities at a discount of 10% to 30% lower than market prices.
This initiative involves several implementation mechanisms such as PJRM bergerak, PJRM premium, PJRM@premis, PJRM@pasar, PJRM@kampus, and PJRM@kampung orang asli. The implementation method has succeeded in extending the reach of the initiative to all levels of society, covering people in urban and rural areas. For example, the implementation of PJRM@pasar is carried out with the strategic cooperation of local authorities and market traders. Up to 25 October 2025, a total of five markets have been involved in the implementation of PJRM, namely Pasar Ampangan, Pasar Besar Port Dickson, Pasar Pekan Rantau, Pasar Awam Baru Kuala Pilah, and Pasar Besar Tampin. The implementation of PJRM@pasar has involved 51 traders with subsidy payments of RM58,071.06. Apart from PJRM@kampus, it is also an initiative to bring daily necessities to students of public universities with the cooperation of existing campus cooperative traders or strategic partners who have the capacity to provide goods suitable for students' needs. Up to October 2025,
a total of RM130,797.37 was spent on subsidy payments at 11 PJRM@kampus programmes involving 8 public universities, namely UiTM Seremban 3 with 2 implementations, @TechJTM Kampus Pedas, namely ILP Pedas, Kolej Kemahiran Tinggi Mara Rembau, Kolej Vokasional Dato' Lela Maharaja, Universiti Sains Islam Malaysia, Politeknik Nilai with 3 implementations, UiTM Kampus Cawangan Kuala Pilah and Kolej Matrikulasi Negeri Sembilan.
PJRM@Premis has been implemented 271 times involving 82 up to 2025. This initiative has brought an average of 35 to 40 types of goods with a subsidy expenditure value of RM2.571 million. The implementation of PJRM has helped ease the people's cost of living and benefited 1.3 million people in Negeri Sembilan, using a subsidy allocation of RM28.9 million offered by the Government.
Dato' Yang Dipertua, apart from PJRM, another initiative by KPDNNS is addressing the cost of living issue by implementing the Menu Rahmah initiative, which encourages traders to provide balanced meals at a price of RM5 ringgit to support this initiative. KPDN Negeri Sembilan provides Menu Rahmah discount cards that can help Menu Rahmah traders obtain raw materials and cooking necessities at PJRM in higher quantities. Traders who wish to obtain a Menu Rahmah discount card may contact KPDN Negeri Sembilan for further information.
In addition, KPDN Negeri Sembilan has implemented the Maximum Price Scheme for the festive season for the 4 main festivals, namely Hari Raya Puasa, Chinese New Year, Deepavali and Christmas Day. Through the implementation of this scheme, the determination of maximum prices made on essential goods during the festive season is to ensure traders do not take the opportunity to reap unreasonably high profits. KPDN Negeri Sembilan can also ensure the supply of goods is verified in their daily operations.
Traders are also required to display pink price tags for controlled-price goods throughout the duration of the scheme. Furthermore, the implementation of the Patuh programme is a strategic step to strengthen the culture of compliance among business entities in this country. Through this programme, KPDN Negeri Sembilan intends to ensure every industry player operates in accordance with the laws, standards and guidelines set.
For the first year of implementation, two main initiatives are introduced as a Pilot Project, namely the Patuh Transit Zone (ZPP) and Patuh Markets. For the Patuh Transit Zone in Negeri Sembilan, there are four locations involved, namely the Kawasan Rehat & Rawat, R&R Plus Seremban for both the northbound
and southbound directions, and Hentian Sebelah Nilai for both the northbound and southbound directions, while Pasar Ampangan has been selected as the first location for Patuh Markets for Negeri Sembilan. Continuous monitoring will be carried out on the premises involved to ensure traders' compliance levels are at a good standard and to create a conducive business environment while protecting consumers' interests in particular.
At the same time, the State Government through the Labour Department (JTK) plays a major role in ensuring all employers comply with the Minimum Wage Order set by the Government. The implementation and compliance of this Minimum Wage ensures workers receive adequate basic income, in line with the increase in the cost of living. Meanwhile, JTK also carries out monitoring through inspections of workplaces, education, awareness of workers' rights and employers' responsibilities to guarantee the welfare and stability of the people's income. Thank you, Dato' Yang Dipertua.
Mr Speaker, may I ask? Aaa... add a question? Honourable Member, I seek the help of the Honourable Member for Sikamat and the State Government to assist the people in rural areas and the elderly, where the Ministry of Domestic Trade and Cost of Living (KPDNKK) is now introducing an application called E-Cost for the purchase of cooking oil. This step is a good one, but Honourable Member, the elderly and rural folk need a smartphone and an e-mail address to register. So it is rather difficult. So, if the Honourable Member can, aaa... in Parliament, please ask the minister to consider using the IC would be sufficient. This is one of the difficulties for the elderly and rural people. Thank you, Honourable Member.
Thank you, Gemas. Insya-Allah, we will follow up on this matter and inform the parties concerned. Thank you, Mr Speaker.
I invite the Honourable Member for Klawang.
Assalamualaikum WBT. Thank you, Mr Speaker. Klawang raises Question No. 1.
Thank you, Mr Speaker. The issue of the water supply in Klawang, this is an issue that, yes... an issue that has not yet been resolved conclusively, insya-Allah. We have seen several matters. Mr Speaker, the problem of water supply disruption during or after rain in the Klawang area is caused by a high increase in the turbidity level of the raw water source at the Loji Air Kuala Klawang. From the hill there, many now are developing their agricultural land, and when it rains, water including from the orchards flows down into the river and causes high turbidity in the river area. Especially when heavy rain occurs in the catchment area, namely Muka Sauk, Ulu Kemin. Turbidity levels above the optimum cause the water treatment operations to have to be stopped, and recently this also happened at Linggi.
When there is heavy rain in Seremban, we have to stop at the Linggi water treatment plant (LRA). To ensure that the quality of treated water supplied to consumers remains compliant with the standards set by the Ministry of Health Malaysia (KKM). As a short-term solution, SAINS has implemented several measures as follows: First, to ensure that the Kuala Klawang LRA reservoir is always at a high level, to provide water supply for a period of six hours from the start of the raw water supply disruption at Muka Sauk, Kemin.
Second, increasing the treated water pumping system of the Kuala Klawang LRA from 250 cubic metres per hour to 500 cubic metres per hour to speed up the refilling period of the Kuala Klawang LRA reservoir after water quality returns to normal. For long-term action, the State Government through SAINS has identified, and is now in the process of consideration and approval by the federal and state agencies, to implement a comprehensive plan including upgrading works for the Kuala Kelawang LRA from 6 million litres per day to 8 million litres per day through allocation from Water Asset Management Berhad (PAAB). The status of the application is in the approval process by PAAB. The second one, a proposal to connect the water distribution system from the Titi LRA to part of the Kuala Kelawang LRA water distribution system. It can reduce the burden on the Kuala Klawang LRA due to the quality of the raw water source at Muka Sauk, Ulu Kemin.
And the third, an application from the Water Regulatory Body (BKSA) to consider building a Sabo Dam for Muka Sauk in Ulu Kemin. The State Government is confident that through the implementation of these measures, the problem of water supply disruption during and after rain in the Kuala Klawang area can be reduced in stages, and then be addressed comprehensively within the next few years. Insya-Allah, thank you, Mr Speaker.
Okay, Honourable Member for Sikamat. Mr Speaker, this issue, I think, has dragged on for so long. We have the large Sungai Triang Dam, and it channels water to the Sungai Trip Dam, the Sungai Trip LRA, the pipe... eh, what is this, Mr Speaker, but it does not bring any benefit at all to the people of Kuala Klawang. The pipe passes through Kuala Klawang, as we can see. So I think, if there is, what is it called, a process for us to upgrade the Kuala Klawang LRA, so that it can use the water from this dam. Because if we upgrade, what is it called, the existing Kuala Klawang LRA, and it still uses the Sauk at Ulu Kemin, then this problem will not be resolved conclusively, Mr Speaker.
I hope that, what is it called, a more comprehensive plan needs to be made, to ensure we can put an end to this situation, because two weeks ago, on the 28th or thereabouts, that was the situation. That morning there was a rather strong, or rather heavy, rain, and that afternoon when people wanted to clean their houses, the water pipe had been cut off, the water from the SAINS pipe had been cut off. So I think, Mr Speaker, can we resolve this, can the State Government resolve this situation that has dragged on for so long. Thank you.
Thank you, Mr Speaker. I will look at the proposal, and I think if we can expedite what we have proposed, especially in distributing water from Muka Sauk Titi to Kuala Klawang, this will also reduce the immediate impact on the residents of Kuala Klawang. Thank you, Mr Speaker.
I invite the Honourable Member for Chembong.
Wrong to ask, wrong not to ask. Honourable Member, Mr Speaker, I raise my Question No. 1, which is a question about the matter of teachers. Specifically teachers serving in the Rembau District, Mr Speaker. Thank you.
Thank you, Mr Speaker. Thank you, Honourable Member for Chembong, for the question relating to the shortage of teachers in the Rembau District. For the information of Mr Speaker, in the Rembau District at present there are a total of 842 teachers, yes, of whom 549 are teachers in primary schools, which is equivalent to 96.83%, and 293 teachers in secondary schools, which is equivalent to 97.0%. It is admitted that there is still a shortage at present, where in primary schools there is a shortage of 18 primary school teachers still lacking, involving 13 schools, and in secondary schools there are 9 teachers still lacking, involving 5 schools, Mr Speaker.
Mr Speaker, allow me to ask one or two additional questions. The purpose of my asking this, Mr Speaker, is that we want to know, what action will be taken by the parties concerned, Mr Speaker, first. In view of the shortage that is occurring now. Second, Mr Speaker, my question is, if it can be signified, especially to the teachers, particularly in the Rembau District, who are watching this live broadcast, Mr Speaker. As a signal that I take great care and high concern for the fate of the teachers in the Rembau District, Mr Speaker.
Mr Speaker, I would like to ask a little, whether there has been a policy regarding a little inequality, that is, I have been informed about the 'cola' allowance, Mr Speaker. This 'cola' allowance is given to teachers at different rates between districts, especially in the Rembau District, Mr Speaker. Why has this happened? And if this difference occurs, I hope it will be given attention so that it shows fairness for all teachers in the districts, Mr Speaker. Thank you.
Thank you, Mr Speaker. In relation to our efforts to complete the number of teachers in these schools, as we are well aware, we depend on the establishment warrants, and only if there are new teachers can we fill them, but the actual number is not so critical in the Rembau District here. As for the cola outside, as far as I am aware, it is not in my information, Honourable Member. Regarding the difference in terms of that amount. So I apologise, I cannot answer now. Thank you, Mr Speaker.
Mr Speaker, I request a reply during the winding-up session, Mr Speaker. Thank you.
Thank you, Mr Speaker, thank you, insya-Allah. I will answer during the winding-up.
I would like to invite the Honourable Member for Seremban Jaya.
Thank you, Mr Speaker. Seremban Jaya raises Question No. 3. Thank you.
Thank you, Mr Speaker. Thank you also to the State Assemblyman (ADUN) for Seremban Jaya who asked the question relating to the construction of plantation worker housing. I would also like to express my thanks to the ADUN for Seremban Jaya for his concern and also for being sensitive to the issue of plantation workers.
Mr Speaker, the statement regarding the allocation from the Federal Government under the Ministry of Human Resources for the construction of plantation worker housing refers to initiatives such as the Special Estate Workers Housing Financing Scheme, also known as SKRE. SKRE is a subsidised housing financing initiative managed by the Federal Government through the Ministry of Human Resources, with funds channelled through the National Savings Bank. The main objective of this scheme is to enable plantation or estate workers and former local plantation workers from low-income groups, namely households earning RM4,000 and below, to own their first home through a loan facility with a very low fixed interest rate of 2% per annum, and the repayment period is also long. As a guarantee of social welfare. However, due to the absence of allocation, no allocation was received by the Negeri Sembilan State Government through this programme. Nevertheless, the Negeri Sembilan State Government has shown proactive efforts that make use of state housing mechanisms, namely to help the fate of plantation workers, especially former plantation workers.
The first is offering subsidised Rumah Mampu Milik Type A, where the State Government has offered Rumah Mampu Milik Type A at Taman Kirby Labu on a subsidised basis to former plantation workers, as happened to former workers of Sime Darby Plantation at Labu. The second, the subsidy includes reducing the selling price of affordable homes, for example from RM40,000 to RM36,000, and providing additional rental subsidy while waiting for the houses to be completed. The Government has allocated a total of RM3.3 million ringgit, covering RM2.8 million for the purchase of 36 units of houses valued at RM80,000 each, and RM484,200 ringgit as administrative and management costs to the Negeri Sembilan State Development Corporation.
For the purpose of purchasing 36 units of Rumah Mampu Milik Type A at Taman Kirby Labu, which will subsequently be sold at a subsidised price of RM36,000 to 36 former Sime Darby Plantation workers at Labu. For your information also, in the provision of people's housing or PPR, there are efforts to build public housing projects in areas with a high population of plantation workers, such as at PPR Rantau Seremban, PPR Taman Seliau Jaya, Port Dickson, and PPR Ladang Tanah Merah Port Dickson, to ensure they have a conducive place to live. The detailed information is as follows: At PPR Rantau Seremban there are 100 units, PPR Taman Seliau Jaya Port Dickson 150 units, and PPR Ladang Tanah Merah Port Dickson 100 units. In total, 350 units have been completed and handed over. Thank you.
Thank you, EXCO for Repah. The answer is clear, thank you. But my question, it is not really a question. There is an allocation of about RM50 million at Human Resources, it has been there a long time, I recall it has been 20, 25 or 30 years, that money has been there, at the savings bank. Is there a plan for the future, the State Government always, Rumah Mampu Milik Type A, a developer built them, we asked for Type A houses, before RM80 thousand, now if I am not mistaken RM120,000. Our state government, that is, the Honourable Menteri Besar of Negeri Sembilan, the Exco members have experience, the Senior Exco, and Dato' SS, Dato' Finance, the Mayor. Can our plan be with MBI? We think, we propose, within 10 kilometres for Ladang Kombok. Can the Human Resources Centre give a site of about 200 units of affordable homes? We as the Government can build it ourselves, that money is already there, at the centre. When we as the state government build the houses ourselves, we can give to many people. When there is a ballot, 50 houses, there are 100, 150 people waiting. But only 50 people get them. But a state government plan is a good one. We ourselves build and make a profit, or MBI makes a profit for the Government, one day the people will also be comfortable. Is there a plan to meet the Minister of Human Resources to discuss this matter? That money was used in Perak state, there is a place where they have built, still Honourable Minister of Human Resources, Honourable Kula. Now can we discuss it? That is my question. Thank you.
Thank you to Seremban Jaya for the additional question just now, and I welcome the proposal from the ADUN for Seremban Jaya and we will take this matter forward and discuss it so that we ensure these plantation workers get a conducive house for them, and we will discuss it at the level of the Ministry of Human Resources and will also seek cooperation from the State Government. Thank you.
Mr Speaker, may I have an additional question? On Repah?
What is this? An additional question?
Yes, one? Regarding the question, Honourable EXCO, regarding these plantation workers mentioned just now at Labu, some plantation workers have long applied for these houses, and when the time came for them to get them, they had already finished their contracts or work at the plantation concerned, but they were denied their rights. I think some residents there have come to meet them and say they came to meet EXCO Honourable Arul, but they were not considered. Imagine, they have applied for a long time and they know this plantation, they will finish their work. But within a few years, they have no longer been working, but when the Government finished negotiating with certain parties to provide houses, they were denied their rights. So, I think the State Government or the Exco should consider it because they are also workers who have fought for a long time, but when the time came they were denied their rights because they no longer work. Thank you.
Thank you to Labu for the question just now. This is new information for me, I will study it and inform you during the winding-up. Thank you.
I invite the Honourable Member for Labu.
Thank you, Mr Speaker, I stand to ask Question No. 1.
Mr Speaker, Labu's question concerns the JKR road reserve. Mr Speaker, road reserves under the Public Works Department (JKR) may not be used by the public or any party without written approval from the Ministry of Works (KKR). This matter is in line with sections 3 and 4 of the Federal Roads Act 1959, Act 376, as well as Section 84 and Section 85A of the Road Transport Act 1987, Act 333.
Any activities such as the construction of roadside stalls, storage of materials or goods, and disposal of construction waste are prohibited, as they may cause disruption and endanger road users. However, the installation of utilities is permitted, subject to official applicants and approval and compliance with the technical and safety conditions set by JKR. Thank you, Mr Speaker.
I would like to invite the Honourable Member for Lukut.
Thank you, Mr Speaker. Lukut raises Question No. 1.
Thank you, Mr Speaker, thank you Honourable Member for Lukut. The question is, Question No. 1, Does the State Government plan to build a new hospital in the Port Dickson District to reduce dependence on the hospital in Seremban? Mr Speaker, this is my answer. At present, there is no plan for the construction of a new government hospital in the Port Dickson District. However, to cater for the service needs in that district, Hospital Port Dickson has received an allocation approval of RM177 million ringgit Malaysia under the Tenth Malaysia Plan for the construction of a specialist block for Hospital Port Dickson.
The scope of the project includes an additional 140 beds, 4 surgical theatres, specialist clinics, and other clinical and clinical support components. At present, the project is in the early stages of construction. That is all, Mr Speaker. Thank you.
Additional question. Mr Speaker, apart from the contract cost mentioned earlier, the RM177 million just now, for design and build, what is the estimated additional cost for equipment, medical, ICT and operational preparation? And how many new posts have been applied for to the Public Service Department (JPA) or the Ministry of Health (KKM) to ensure this hospital can operate fully? Thank you.
Thank you, Honourable Member for Lukut, for that question. I will answer that question in writing. At present, I do not have the data for that answer. Thank you, Honourable Member, thank you, Mr Speaker.
I invite the Honourable Member for Lukut.
Lobak. Thank you, Mr Speaker, Lobak raises Question No. 1. Thank you.
Thank you, Dato' Yang Dipertua. Regarding water pipes. Dato' Yang Dipertua, the total number of burst water pipe cases recorded through the SAINS complaints registration system for the years 2021-2025 is 27,279 cases across the whole of Negeri Sembilan. The breakdown by district is as follows: Seremban 11,059 cases, Port Dickson 2,554, Jempol 3,050 cases, Tampin 2,913 cases, Kuala Pilah 3,928 cases, Rembau 1,528 cases, Jelebu 2,247 cases. The level of pipe damage involves the categories of small, namely minor leak, moderate, join failure and large, namely main burst, depending on the location and the pressure of the pipeline. For repair works, the types of material used include mild steel pipes and UPVC pipes according to the size and water pressure at the locations involved. The total expenditure for the cases in that period is estimated at RM147 million, covering repair works, pipe replacement and restoration of road surfaces. For every pipe burst case, immediate action was taken by temporarily shutting off the water supply, carrying out repair works and restoring the water supply in stages to ensure that disruption of the water supply to consumers is minimised.
First, to address the problem of burst pipes, which often cause difficulties for the people, the state government through SAINS has drawn up a long-term plan for the management of water supply assets, to be implemented in stages throughout the state. At this time, a total of 68 locations involving pipes amounting to 243 kilometres have been identified for pipe replacement through collaboration between PETRA, Pengurusan Aset Air Berhad (PAAB) and SAINS. For pipe replacement under SAINS allocations, it involves 12 locations, namely 2 locations in Seremban, 1 location in Port Dickson, 1 location in Jempol, and 2 locations in Tampin, 3 locations in Kuala Pilah, 1 location in Rembau, and 2 locations in Jelebu; this pipe replacement involves a total length of 14.2 kilometres. For pipe replacement under PAAB allocations, it involves 16 locations, namely 4 in Seremban, 3 in Port Dickson, 1 in Jempol, 2 in Tampin, and 2 in Kuala Pilah, 2 in Rembau and 2 in Jelebu. This pipe replacement involves a total of 60.8 km.
For pipe replacement under PETRA allocations, it involves 40 locations, 8 locations in Seremban, 7 locations in Port Dickson, 2 locations in Jempol, 12 locations in Tampin, 2 locations in Kuala Pilah, 4 locations in Rembau and 5 locations in Jelebu. This pipe replacement involves a total length of 168 km.
Second, to strengthen the state's water supply system, projects to upgrade the main infrastructure have been and are being implemented, including the construction of new water treatment plants, balancing tanks, as well as increases in capacity, pumping systems and main distribution pipes. Lastly, aspects of effectiveness, management and maintenance have also been improved through the addition of technical patrol teams, improved logistics capability and ongoing training for staff to ensure a faster and more efficient response to any leak complaints. With the implementation of this long-term plan, the state government is confident that the incidence rate of burst pipes can be reduced significantly within the next few years, thereby ensuring a more stable water supply of sustainable quality for the well-being of the people of Negeri Sembilan, and insya-Allah its implementation will begin early next year. Thank you, Dato' Yang Dipertua.
Thank you, Dato' Yang Dipertua. The clearest answer from Sikamat, and in this honourable House we extend congratulations and well done, because SAINS under the guidance of Sikamat, the water supply in Negeri Sembilan has indeed improved. That is one i think effort which the SAINS team earlier, and I too in this honourable House, thank SAINS for, that in Taman Bukit Berlian, which I previously raised in this House, where there were four to five pipe bursts a month, so I thank them, especially Sikamat, and the SAINS members, that the 200 metres have now been replaced with new pipes. So, the burst pipe here no longer recurs, thank you. Furthermore, I too want to ask SAINS, in cooperation with residents, as soon as there is a complaint about SAINS pipes, I am in contact with the officer, and within 4 hours the problem is resolved. So the water supply has been promised, but my additional question is about NRW, my additional question is, I want to ask about the latest status of NRW, and also the water arrears bills, what is their status? Thank you.
Thank you Dato' Yang Dipertua, on the question of NRW, insya-Allah I will ensure that I reply either in the winding-up speech or in writing later. Our NRW is quite high at present, because we are striving to replace old pipes with new pipes, with cooperation from PETRA, from PAAB, from SAINS itself, and we will allocate the respective allocations to ensure that what we do, implement this, can reduce our NRW to only around 33%, insya-Allah. Thank you, Dato' Yang Dipertua.
Dato' Yang Dipertua, briefly, a small interjection, I want to ask a little about the SAINS issue, regarding aaa…. I want to ask a little, this is what the people are asking, regarding tanks, recently there was aaa… no water for 3 days, and among the housing estates that have tanks, but they are not operating. For example, Taman Exora, Taman Senawang Perdana, and what is the status of the tanks that are not operating? Yes, I would like some data, perhaps it can be deferred, and why did this thing happen? Now? I would like to obtain some data on this. Why has this happened? Because we have no water, if, if, if.. we use the tanks that are not operating, it would be better.
Thank you, Dato' Yang Dipertua, Exora has just been completed, it has been a long time, I think it has been six months since we completed the new tank, we replaced the old tank with a new one. Senawang Perdana, I will check because that housing estate is still very new, and I will check the status, and what we are doing now is that we are conducting a study of every existing tank in the housing estates to resolve this problem, we have already resolved it in part of Lukut, because the other day we had a problem in Lukut, we replaced about six, six…. six water tanks that were old with new ones, and we replaced all the pumps as well, and for that reason, we continue with the study and in…. we also tanti (replaced) in Kuala Pilah, in Batu Kikir, yes, Batu Kikir, for one new tank, and then we are conducting a study on several suitable ones for us to replace from time to time. Thank you, Dato' Yang Dipertua.
Aaa… a little, not Taman Senawang Perdana, yes, Taman Pinggiran Senawang, eh… its tank, the old one
Thank you, I will check Taman Pinggiran Senawang, thank you, Dato' Yang Dipertua.
Dato' Yang Dipertua, earlier perhaps I was afraid to leave out the additional question, which is about the water arrears bills from consumers. Thank you.
Thank you, Dato' Yang Dipertua, there is one more additional question, yes. In fact I would like to extend a thousand thanks to the people of Negeri Sembilan because of their awareness in ensuring that the bills that we issue to them, they pay from time to time, and at this time, Alhamdulillah, our bill payment performance is around 98%. This is a very good thing and I also hope that they will continue to give their support to SAINS in improving our performance throughout the state, to ensure better facilities, our water management is better, and they receive water that is, that is healthy enough for everyone's use, insya-Allah.. Thank you, Dato' Yang Dipertua.
Honourable Member aaaa….. Sungai Lui
Honourable Dato' Yang Dipertu, I submit my first question.
Honourable Dato' Yang Dipertua, I would like to thank the ADUN Lui for raising a question related to agriculture. In the question from the ADUN Lui, there are two segments: the first relates to agricultural products and the second relates to community agricultural development. For the information of the Honourable Members, the Touch Point Fruit and Vegetable Programme is one of the initiatives under the Negeri Sembilan State Government, implemented through the Negeri Sembilan Department of Agriculture, this is well known to all. The purpose of this programme is to make use of land for the production of high-value fruit crops and fresh vegetables, as well as to increase the income of rural residents and to support the state's food security agenda, which I have often mentioned in this House and also at related gatherings. To date, for the information of the House, the Touch Point fruit programme has been implemented in 65 Village Development and Security Committees (JPKK), yes, 65, throughout Negeri Sembilan, with the participation of more than 1,800 participants comprising local residents. This programme involves the provision of quality fruit tree seedlings such as durian, cempedak, coconut and also agricultural inputs throughout that period.
Meanwhile, for the Touch Point vegetable programme, 1,600 participants have received agricultural kits. The latest is that all Chairmen and Secretaries of JPKK throughout Negeri Sembilan have been given agricultural kits which include planting materials, seeds, and basic equipment. Part of the agenda is to instil interest in agricultural activities and agenda at the village leadership level right down to the grassroots. This programme is implemented in such a way, apart from what I mentioned, to benefit urban and rural residents. The Community Agricultural Development Programme aims to increase community involvement in planting activities and to increase the income of individuals and households. Therefore, Dato' Yang Dipertua, this community agricultural programme is also implemented under the Muafakat Tani Incentive, which we have been running for quite some time now, in the form of small-scale agricultural programmes or projects. Through this initiative, various forms of assistance are channelled, including modern technology-based fertigation systems to community groups to improve production yields and crop management efficiency.
For the information of the House, to date a total of 30 communities…35 communities have benefited from the implementation of this programme and thereby
demonstrate the effectiveness of the State Government's efforts in strengthening the agriculture sector, communities and expanding people's participation in the state's food security agenda.
For the information of the Honourable Member and the honourable members of the House as well, in the tabling of the 2026 State Budget, last Friday, the Honourable ADUN Sikamat announced the Harapan Seedling Programme, One Village One Crop, with an allocation of RM250,000. This is another new initiative that will be coordinated together with the Department of Agriculture and the Honourable Members. For this, the State Government is committed to expanding this programme throughout the villages step by step, stage by stage. The purpose of the State Government in holding this programme is to provide another boost so that more village residents are involved in fruit and vegetable planting activities and thereby make this agriculture sector a main driver of the state's economic growth. And through this message, Dato' Yang Dipertua, I would like to state that out of this RM250,000 we are able to implement it in at least 14 State Assembly constituencies with the participation of one or two villages, to make them a starting project for one village, one product. Thank you, Dato' Yang Dipertua.
I invite the Honourable Member for Juasseh.
Dato' Yang Dipertua, I submit question number one.
Thank you. Thank you, Honourable ADUN Juasseh, for the question regarding the TVET pathway for Orang Asli children students. For the information of the House, so far, there is no specific data, yes, that states the number of Orang Asli children students who follow TVET courses in our country. However, at the national level, there is an increase; data shows that more than 500 Orang Asli students registered at universities and also colleges in 2025. This is, it is good news, yes, but specific data stating how many take up TVET courses does not yet exist, Honourable Member, yes.
However, we face some constraints in terms of bringing Orang Asli students, these Orang Asli children, to TVET courses, because the main problem is the matter of drop-outs, the matter of Orang Asli students dropping out at the school level, and this affects the continuity of the pathway from SPM to TVET. However, Dato' Yang Dipertua, I propose that one of the efforts we need to make today, if
we want to expand TVET to the knowledge of the Orang Asli community, is through roadshows, I propose roadshows. The best way, involving the Department of Orang Asli Affairs (JAKOA), then TVET institutions that exist in our country, especially in Negeri Sembilan, we hold roadshows from village to village. This may provide information because they lack information, as I said earlier, many of them drop out of school, and those who succeed in fact enter higher learning institutions, but in terms of TVET data, there is none. Therefore, I propose that we hold a roadshow, we can sit together with TVET institutions and also JAKOA, and then we can identify the interest of Orang Asli children in TVET courses, Dato' Yang Dipertua.
I invite the Honourable Member for Serting.
Thank you to Dato' Yang Dipertua, question number one. Thank you.
Honourable Dato' Speaker. Thank you, Serting. Serting's question is rather special. First, he asks how serious the State Government's efforts are to provide houses for the second generation of Felda, which are often raised when a General Election is about to take place. Okay, still. Now the second question, Honourable Member. Is it merely made into an issue, or a political sweetener for the second generation of Felda? Honourable Member, slow down a bit, Honourable Member. I have mentioned the second-generation housing issue, Honourable Member, since I took my oath, both as a Member of Parliament and as an EXCO. The election is still far away, Honourable Member, five years from now. This is not about political sweeteners. This is for us to resolve the problems of the second generation of Felda that have existed for a very long time, Honourable Member.
So, I want to explain today, Honourable Member, for the information of the Honourable Members, I want to recall 2019, the Pre-Prihatin fund allocation under the PH 1.0 Government. At that time, aaa… if I am not mistaken, the Honourable Minister from your party, Honourable Member, had allocated funds at that time, I was not in the PRIHATIN Fund. Correction, the minister from your party allocated funds to complete 2,546 units of second-generation Felda houses in the white paper tabled in the Dewan Rakyat. And at that time, what was the government's decision? The government's decision was that any second-generation Felda housing site that had reached 70% and above per…. aaa… what is this? aaa… in its completion process, 70% and above, the project would continue, and 70% and below would be stopped.
In Negeri Sembilan, for the Raja Alias Federal Territory, the PGBF involved are PGBF Palong 8 (300 units), PGBF Pasoh 2 (70 units), in the Jempol District, namely the DUN
Serting, while PGBF Bukit Jalur 239 and PGBF Bukit Rokan Utara 300 in the Tampin District, which in total, with permission, is 909. This is included in the white paper, yes, which was already tabled by the minister at that time. Then it would proceed as usual, Honourable Member, the issues of delays in project completion, appointing contractors, then the contractor failed, failed, terminated, then a new contractor was appointed and so on, until today. Out of these 909 units, not a single unit has been completed by Felda. Apart from these 909 units, which are in the process of rehabilitation and completion, Honourable Member, the Felda Board Meeting Number 449, the first time in 2024, in January 2024, approved another 3 projects. Not approved, abandoned projects also.
We have the 909 abandoned projects I mentioned earlier. That was handed over to Felda under the white paper. Then we have another five areas, three more areas covering 510 units. Where are these 510 units? One is Pasoh 3 (150), Palong 12 (150), then Palong 16 (210). These 510 units are under the 70% that was included in the white paper tabled in the Dewan Rakyat. Then from these 510 units, Felda, as I mentioned earlier, in January 2024 agreed to hand them over to the state government to take over, to execute, with permission, to execute these projects through efforts carried out by the state government. What did the state government do? I already explained in the previous House, when it was handed over to the state government, the state government through PKNNS, the Negeri Sembilan State Development Corporation (PKNNS), carried out an RFP, Request for Proposal, to select the best company to complete these abandoned projects. Of what has been issued, the aaa… Honourable Members, for the information of the Honourable Members, once we issued the RFP, a total of four companies submitted RFPs.
Of the four companies that applied to submit RFPs, only three companies committed to tender and showed interest in implementing this project. Of these three projects, Honourable Member, not a single company submitted this RFP. After engagement programmes and interviews and so on were held, not a single company was willing to implement the 510-unit project. So, when not one was willing, the project remains pending at the action stage of PKNNS and UPEN, namely the State Economic Planning Unit, on how to continue this project. Because for these 510 units, the infrastructure cost alone, the infrastructure cost for what, to execute, with permission, Dato' Speaker, to implement this project, this programme requires almost RM35 million. I submitted the RM35 million to the Ministry of Rural and Regional Development. So far, no feedback or approval of this RM35 million fund has been received. We want to put under the RFP of the company to bear the cost of this RM35 million, so the price of these houses will not be affordable for the second generation of Felda, when this cost is included in the overall completion cost. Sorry, that is our problem, but from these three projects, namely Pasoh 3,
Palong 12 and Palong 16, Pasoh 3 and Palong 12 have already obtained GSA status, which has been cancelled, and now the UPEN is drafting the way forward on how we can settle these two projects first, so that the 510 units at Pasoh 3 and Palong 12 can be completed within certain timeframes.
And finally, Honourable Member, I also want to put forward that in these 909 projects, there are the Bukit Rokan and Felda areas, Honourable Razi, Felda Pasoh 3. Felda Pasoh 3 has already reached the stage of reaching the border now, so it can be released. We have not released Pasoh 3 because it flooded previously. When there is flooding, the CCC is not issued by the Jempol Municipal Council. When Felda and the government took action to overcome the flooding problem, which we have now identified is almost done, so, insya-Allah. aaa… I hope there will be no more delays, insya-Allah. In January, the handing over of keys will be carried out to the successful owners, to the public or recipients at Felda Pasoh 3, and those at Bukit Rokan are also being dealt with now, because there is a small problem related to SAINS and also Tenaga Nasional, and all matters are being handled now, and aaa… I am confident we can also implement part of the 300 housing units at Bukit Rokan, insya-Allah. Thank you, Dato' Speaker.
aaa… supplementary question, Dato' Speaker. Thank you all for the explanation given by Dato' Seri. However, I want to ask, regarding the problem of price, as mentioned by Dato' Seri just now, among them the issue of price, which the children of settlers cannot afford, or the generation of these settlers. Is there a way or process that allows the children of these settlers to afford it? I have been informed that most of these settlers' children are working and have payslips, so there is no problem. If they wish to buy a house, any house, not only this one but other things, meaning they are able to take a loan from the bank. As for those who do not have payslips, for example those who are self-employed and so on, is there any other commitment that can be arranged? Because these children are also pitiful, living in their parents' houses, and there are many of them, having children there… yes… thank you.
A good question, Honourable Member. I have received a lot of feedback from aaa… the second-generation Felda children who tagged me personally, and who brought it through the ADUNs, raising the problem of their inability to obtain end financing or aaa… what is this, financial facilities from financial institutions because they have no payslips, no fixed income, and so on. Aaa… I want to inform the House that there are two methods we will implement.
The first is that these houses cannot be sold at the earlier price. RM90,000 is no longer possible, it is not possible, whatever method we use, we can no longer do it, because the cost to build and complete these houses has exceeded the reasonable price. Previously, RM90,000, the government subsidised almost RM60,000 per unit. Now, with the subsidy provided, it is no longer possible to sell at RM90,000. Therefore, the houses at Felda Pasoh 3, we sell at RM110,000 according to the standard affordable housing price under the state government. RM110,000, eh… for the corner lot it is a little more. Then, from this RM110, for the information of the Honourable Members, we have a special aaa… not a special treat but there is a bit of a privilege, for any second-generation Felda settler who does not have a payslip, who does not have a fixed income, in order to enable them to obtain financial facilities, we arrange with several financial institutions such as Bank Simpanan Nasional, Bank Pertanian Malaysia, and several other financial institutions to ease the approval conditions to obtain financial facilities to fund their purchase of these houses. This has already been implemented at Felda Pasoh 3 in the Lui state constituency, where 77 housing units have been approved for financial assistance for buyers from the second generation of Felda in the area concerned. This has already been carried out, yes.
Then, the second, I am preparing several policy papers for approval at the Felda level, so that we can give yet another privilege, namely RTO, Rent To Own. For any second-generation Felda house that has been successfully obtained by the second generation of Felda, they receive the RTO-Rent To Own facility, meaning they rent, move in, pay the utility bills, and get the keys immediately, and pay rent of RM300 a month. From this RM300 a month, after five years, they will calculate how much you have paid? RM300 a month means a year is RM3,600, five years how much? And these five years are used as the deposit payment for ownership of the house. Then only efforts are made to obtain end financing, financial facilities. We do it that way, but Honourable Member, this has already been done at Felda Pasoh 1. For 132 units, we use the same concept, but there are members of the second generation, second-generation Felda, who successfully obtained this facility, they do not pay rent. Even after a year without payment, two years without payment, they do not pay rent. When they do not pay rent, like it or not, Felda has to take action to terminate this agreement. That is their problem.
So what this means is, if second-generation Felda come to complain that they want to take back the house, Felda does not give them a chance. We give them the opportunity, RM300 a month, you do not pay, up to five years we do not get paid, so how do we resolve this financial problem that is related to the ownership of this house? So like it or not, Felda has to take action to terminate this agreement. So this means, now
the process is underway, and the facility will be extended to any PGDBF projects that we will implement under the Honourable State Government. And finally, I would also like to mention that for Bukit Rokan, Felda Pasoh 3, there are still vacancies, and then in any area that is in the process that we expect to approve and grant ownership in month 1, then month 2, the selection process of participants among the second generation of Felda is underway. For this, I have asked IGM through the Felda Manager and also aaa… what is this? The heads of settlers to implement a list of eligible persons to apply for a house. For example, in Pasoh 3, we have 560 heads of households, there are 150 houses, all families may submit applications to obtain these houses. Then the committee will screen all of them, and when it is found that there are more eligible persons than the number of houses available, then the balloting process will be carried out fairly and transparently. This means all who are eligible, we will draw lots transparently. Thank you, Honourable Member.
I invite aaa… Honourable Temiang.
Thank you, Dato' Speaker. I put forward my first question.
Thank you, Dato' Speaker. Thank you for the question raised by the Honourable Temiang regarding Chinese cemetery land. For the information of the Honourable Temiang, based on information obtained through the Computerised Land Registration System (SPTB), there are a total of 22 registered titles for Chinese cemetery land in Negeri Sembilan, with a total area of 191.9493 hectares, and the annual quit rent paid is RM40,463. Regarding detailed information, I will later share with the Honourable Temiang, and for everyone's information, in fact, most of the registered lands are private cemeteries. For example, Nilai Memorial Park, Bahau Memorial Park, Melody Park, CL Memorial Park, The Titula Roman Catolic Bishop of KL and Xiao En Land Berhad. Thank you.
Thank you, Dato' Speaker and Honourable Exco for the answer. My supplementary question is regarding cemetery lands operated by Chinese associations. Here, I want to ask whether the state government will impose a maximum payment limit, ah, on these associations, because at present they charge very high fees to us, the Chinese community, for these funeral arrangements. And some charge different prices according to the land or the location of the land. So this is very burdensome for the Chinese community for this matter. And their lands have not been provided by the State Government to help
and operate this matter. So I think we need to take this seriously to ensure there is no misappropriation.
Okay, thank you for the supplementary question from the Honourable Temiang. The supplementary question from the Honourable Temiang is indeed a very good question. I think we all know that for these cemetery sites, in my view, although some parties try to say they are insufficient, what the government is doing all this time is always ensuring that these cemetery sites are sufficient. The only problem I think all of society faces, whether Chinese, Indian or Muslim, I think our problem is the cost of managing the burial, it is quite high. And sometimes those who complain say the charges are rather burdensome. So in this matter, in fact the State Government, although we have no policy to control the price charged, what I want to inform, in this august House, is that for cemeteries managed by the Seremban City Council, I can say the burial charges are very reasonable.
And at the same time, for these cemeteries, it is not like housing policy. We can limit, we can have policies where we have Type A Affordable Homes at RM80,000, RM110,000, but we cannot, we have no power to limit those prices. So in this matter, I also want to inform this august House that in fact the State Government, we always listen, always consider views from the associations that manage these Chinese cemeteries.
And I also want to take this opportunity that several Chinese cemetery associations have applied to build, what is it… ash storage houses, so that they can ensure they have sufficient land to manage burials. That is something that is being pursued and implemented by the government. And for me, what is important is that we must ensure that for NGOs or associations that manage these cemeteries, they must ensure that all prices or all values they offer are reasonable and that they ensure our people who face issues or problems can have them resolved. That is my view, to some extent. Thank you.
I invite Johol, Honourable Johol.
Thank you, Dato' Speaker, Johol, question number two.
Thank you, Dato' Speaker. Thank you, Johol. On the subject of religion. Dato' Speaker, the Negeri Sembilan Islamic Religious Affairs Department (JHEAINS) under the Thirteenth Malaysia Plan has taken the initiative to plan development that focuses mainly on maintaining and upgrading existing mosques in Negeri Sembilan, looking at needs from time to time based on priorities and the allocations received. For the information of the Honourable Member, the Islamic Religious Affairs Department has submitted a proposal paper to upgrade two mosques in the Johol area as follows. First, upgrading works for the toilets and open hall of Masjid Kariah Kepis Baru, and second, upgrading works for the funeral room and fence of Masjid Kariah Dingkir.
However, based on expenditure from 2023 to 2025, the government has allocated a total of RM 1,770,000.00 for maintenance and upgrading of basic facilities such as mosques, surau, restoration of Islamic cemeteries and religious schools in the Johol area. These works are subject to maintenance needs according to project priorities from time to time and the allocations received. Alhamdulillah, for 2026, insya-Allah, if approved, we also have an allocation for mosque upgrading works. Thank you, Dato' Speaker.
I invite the Honourable Member for Mambau.
Thank you, Dato' Speaker. Mambau will put forward the first question.
Thank you, ADUN Mambau. Application for extension of the 99-year lease tenure. Please state in detail the total number of applications received and rejected by the Seremban District Office, and the approximate time taken in the process of obtaining approval for applications for extension of the 99-year tenure.
Thank you, Dato' Speaker. The State Government, through the Negeri Sembilan Land and Mines Director's Office (PTGNS), has improved the land application process through the directive issued by PTGNS, namely PTGNS Directive No. 17 (2022), which is the checklist and work process for land development applications under Sections 124(1), 124A, 204D, 197 and 76 of the Kanun Tanah Negara Akta 828. Overall, the time period stipulated for processing one complete land development application, beginning at the Land Office, is 4 to 5 months before it is submitted to the State Authority. PTGNS also adopts the circular of the Director General of Land and Mines Malaysia, Circular No. 2 of 2024, on the Extension of the Ownership Period for Titles with Leasehold Status, and Mukim Leases under Section 90A of the Kanun Tanah Negara. On average, the time taken to process applications for a 99-year lease tenure is 12 months. The total applications received and rejected by the Seremban District and Land Office from 2020 to 2025 are as follows: applications received were 1,770, applications approved were 1,243, applications rejected were 69, and applications still in process are only 458. Thank you, Dato' Speaker.
Honourable Members, the time for oral questions has ended. All questions that could not be answered in time will be given written answers.
Questions — Questions Requiring Written AnswersQuestions
Questions requiring written answers. The Most Honourable ADUN for Sikamat is invited.
Honourable Dato' Speaker, I rise to table the answers to the written questions that were notified in advance, as before the Honourable Members.
Honourable Members, the answers to the written questions are tabled.
Supply Bill (2026) 2025Bill
[continuation of business on the Appropriation Bill (2026) 2025]
Item Four, Appropriation Bill (2026) 2025.
Honourable Members, the Appropriation Bill (2026) 2025 has been proposed to be read a second time and has been seconded. As agreed, on Friday last week, the motion on the Negeri Sembilan Development Expenditure Estimates for 2026 will be discussed and debated together with this bill. Therefore, I now put these two matters forward for debate in principle only. To begin... to begin... to begin this debate, I respectfully invite and call upon the Honourable Chennah. Ooh... Johol.
In the name of Allah, the Most Gracious, the Most Merciful. Honourable Dato' Speaker, the Most Honourable Menteri Besar of Negeri Sembilan, Sikamat,
Honourable Dato' Seri Senior Exco, Members of the State Executive Council, and my respected fellow members of this House. Alhamdulillah, all praise is due to Allah SWT, for by His abundant grace and blessing we are gathered today to debate the Negeri Sembilan State Budget for 2026, which was tabled by the Most Honourable Menteri Besar last Friday, with full commitment, clarity of strategy and vision to bring Negeri Sembilan to a higher level. First of all, let me record my highest congratulations and appreciation to the Most Honourable Sikamat and the entire state administrative machinery for preparing a budget that is not only comprehensive but very much anchored on the well-being of the people, economic growth and the continuity of state development. Honourable Dato' Speaker, allow me to begin this speech with the words of Imam Al-Ghazali, who said that a state will not prosper except with two things: a trustworthy ruler and a dignified people. These words, though written more than a thousand years ago, remain relevant to this day. They remind us that a good government must balance material policies with the nurturing of free, thinking and ethical human beings. This is the value I see prominently in the 2026 Negeri Sembilan Budget this time. It places emphasis on education, human development, welfare, economic growth and investment reform.
Honourable Dato' Speaker, I would like to touch on the first matter, namely the performance and investment economy of Negeri Sembilan as tabled. Negeri Sembilan recorded stable economic growth and is expected to expand at a rate of 3.7% to 4% in 2026. This is a figure in line with the national economic growth forecast and shows that our state is on a firm footing despite facing global economic uncertainty. The unemployment rate was also successfully maintained at a low level of around 2.9%, while inflation is controlled at around 1.7%. This not only gives confidence to investors but also brings relief to the people, especially those in the low-income group. In my view, this reflects the basic economic strength of Negeri Sembilan, supported by the manufacturing sector, modern agriculture, tourism, and increased productivity among the workforce. However, I wish to stress that these achievements should not make us too comfortable, because the world today moves too fast, technology changes every day and economic competition is increasingly fierce. Therefore, Negeri Sembilan must always move forward and cannot simply remain in its comfort zone.
Honourable Dato' Speaker, the second matter I wish to elaborate on concerns investment. I extend my congratulations to the Negeri Sembilan State Government for successfully attracting investment worth RM7.2 billion in 2024 and RM6.2 billion up to the third quarter of 2025, with a projection of RM8 billion in 2026. This is an achievement that is not small. It has a direct impact on employment opportunities and the economic growth of the state. However, I am of the view that our state has investment potential that is much better than what we are achieving today. Only our investment strategy needs to be changed by making it more structured, and I must not be considered excessive in saying that the time has come for Negeri Sembilan to adopt a far more liberal, progressive and flexible approach in offering our investment packages. We can no longer remain too rigid, too conservative or too tied to the old framework. In today's investment, it requires the state government to be more aggressive and responsive in approving applications and offering incentives.
Honourable Dato' Speaker, we need to learn from other states around us. For example, the state of Johor, where we have moved very quickly as a digital hub and data centre. They offer fast-track approvals and very competitive investment incentive schemes. Selangor, meanwhile, continues to dominate the Klang Valley area with an investor-friendly start-up and technology ecosystem. Perak and Melaka are also increasingly diversifying their incentive offerings to attract high-value investment to their states. This means we too must be aggressive. If we do not make changes or a structured long-term investment strategy, I fear our state will fall behind. Investors will take their capital elsewhere. Therefore, I propose that the investment incentive structure of Negeri Sembilan be comprehensively reviewed. We need to provide more flexible packages, expand the land premium discount scheme, introduce fast approval for strategic industries, and offer terms equivalent to neighbouring states. Only in this way can Negeri Sembilan remain competitive in the regional investment landscape. Meanwhile, I would like to link this matter to the Johol State Constituency that I represent. Johol has great potential in the modern agro-food sector, village industry, agricultural technology and rural tourism. As a member representing the people in the Johol area, I dream that a mega investment worth hundreds of millions or billions of ringgit Malaysia can be attracted into my area. Investment like this will not only stimulate the local economy but can also create new, more meaningful job opportunities for young people in other areas such as Kuala Pilah, Jelebu and Jempol. Not merely jobs requiring basic skills, but high quality job opportunities, or high quality jobs, with the prestige that allows the children of Johol to build professional careers without having to migrate to major cities. It is time for Negeri Sembilan to view these areas as more than just rural areas.
Look at and see other districts too as areas with great potential to receive investment that can transform the socio-economic landscape of their communities. With the various basic facilities and connectivity already available in these areas, I believe Kuala Pilah, Jelebu and Jempol should also be preferred locations for the state government to consider as potential areas for investors, both from within and outside the country. And not just concentrated on existing areas such as Nilai, Seremban and Port Dickson alone. So open the doors of investment as widely as possible so that rural areas can also obtain the spillover of this investment and at the same time have the opportunity to become new growth hubs and not merely depend on the main cities.
Honourable Dato' Speaker, the third matter I wish to raise concerns the balance between welfare and human development. I greatly appreciate the state government's efforts in allocating cash aid, people support schemes, education assistance, and various forms of social protection. All this assistance is indeed needed, as is the announcement of a two-month bonus for state government employees in addition to a one-month performance bonus. And I fully support it. However, I wish to remind that the focus on welfare must not become too dominant. Along with that, welfare should be viewed holistically, including through the development of people's well-being by ensuring that infrastructure facilities in rural areas are always complete and orderly. Beyond that, expenditure on welfare should also not overshadow the importance of human development, education, and the building of people's capacity. As Ibnu Khaldun said in his work al-Muqaddimah, the progress of a civilisation does not lie in material wealth alone, but in knowledge, training and the building of human beings.
This statement is supported by a popular expression from the United States figure Benjamin Franklin, namely an investment is knowledge pays the best interest. The words of these two figures are very fitting to our context today. Negeri Sembilan must not only give fish, but must teach our people how to fish. If the people are given knowledge and skills, they will stand more self-reliant and be able to improve their standard of living. Therefore, I welcome the allocation of RM28.81 million for education, including the Generasi Celik AI programme, Fast-Track Tahfiz SPM, the provision of laptops, and scholarship assistance. But I also hope that capacity-building programmes for the people will be expanded, especially in the fields of TVET, digital skills, village entrepreneurship, modern agricultural training, and business incubators.
Honourable Dato' Speaker, in Johol itself, young people have great potential to be in demand, but they need exposure and facilities to increase their income. I myself in Johol give great attention to education development for the people of Johol. Various activities that we have undertaken include tuition programmes for the children of Johol, organised since 2019 up to today. Beyond that, student leadership programmes for the children of Johol have also been organised. This is by inviting local children who are graduates of Imperial College United Kingdom, which is among the best international universities in the world, to inspire the children of Johol so that they too continue to excel in their respective education. These are only our small efforts in Johol. At the policy level, for the development of character and personal values, we need comprehensive cooperation from various parties. Thus, it is hoped that this education aspect will continue to be strengthened by the state government in the coming years. For us in Johol, besides our welfare being looked after, we also become active contributors to the state's economy.
Honourable Dato' Speaker, the fourth matter concerns input regarding development projects around the Johol area. Firstly, I would like to thank the Most Honourable Menteri Besar for approving the construction of additional buildings for Sekolah Menengah Agama Johol with an allocation of RM3 million. The condition of this school indeed requires additional infrastructure because the number of students is increasing and the existing facilities are no longer sufficient. Secondly, I request that programmes such as the Anak Pokok Harapan Initiative, the People's Pond Initiative, and small-scale Agro-Food Projects be expanded to the Johol area. Our area has fertile land and a hardworking community, and I believe these programmes can make Johol a model of rural development.
Honourable Dato' Speaker, the fifth matter, I would also like to offer a few views or comments regarding the administration of the state government. Because as Chairman of the Back Benchers, I want to voice that members of this House, especially from the government side, are always ready to give views, proposals and quality input to the state administration. However, what I want is for the policies and implementation of the state government's administration not to be dominated only by the administrative members, without engagement with us as state government representatives. For example, issues involving charges imposed by local authorities on the people. This has to some extent made things difficult for us, because some of those decisions ultimately require us to give explanations and clarify to the people what is being implemented. Therefore, in my view, the Office of the State Secretary (Pejabat SUK) needs to be more inclusive and involve Members of the Assembly, especially at the early stage of policy formulation and development planning. Remember that we are not merely presenters of issues, but we are a bridge between the people and the state government. For that purpose, I would like to propose that bi-monthly engagement sessions be held between the Office of the State Secretary and government ADUNs so that we can together contribute for the people of this state, insya-Allah.
Honourable Dato' Speaker, at the end of my debate, I welcome the record of this state government's administration. With the government of unity now more than two years old, the state administration's record is seen as very convincing. Therefore I give my full commitment that we will continue to stand firmly behind the leadership of the Most Honourable Sikamat and the Honourable Pertang for the continuity of the development of this state that we all cherish. Believe me, if this state government continues to maintain such excellent performance, we will continue to be a bastion of political stability and support good policies that are to be introduced, insya-Allah. In conclusion, I end my debate by reciting a passage of prayer narrated in Musnad Ahmad (Arabic recitation), which means "O Allah, make the end of all our affairs good, and protect us from the calamities of this world and the punishment of the Hereafter." Thus, in the name of Allah, the Most Gracious, the Most Merciful, I hereby support the Negeri Sembilan State Budget for 2026. That concludes, with Allah's guidance and success, Peace be upon you and the mercy of Allah and His blessings.
Thank you, Honourable Johol. I invite the Honourable Chennah.
Thank you, Mr Speaker. Greetings of peace, and greetings of Malaysia Madani to the Honourable Members. First, I would like to record my congratulations to the Honourable Sikamat and the entire state leadership, for once again succeeding in tabling a good budget, one that shows the state's revenue is continuing to rise. In the trend of these past 2 years, even here in the State Legislative Assembly, in 2024 and 2023 we passed deficit budgets for 2024, and in 2024 we continued with a balanced budget. Nevertheless, in these past 2 years we have seen that actual collection and receipts of revenue have been higher than what was projected or estimated. This has had a positive impact on the state government's financial position, in that there has in fact been a budget surplus. And this, of course, can strengthen the state government's financial position over these past two or three years.
I feel that this is a positive effect and a direct impact of the political stability that we have in Negeri Sembilan. Especially after the last state election, in 2023, we formed a unity government that is solid, stable, strong, and, most importantly, the Negeri Sembilan government under this unity government model has shown a very high spirit of cooperation. And in the state, we do not play politics. We give our full, full focus to state development. So I feel that in this matter I want to record my congratulations to the entire state leadership, both leaders from Pakatan Harapan and from Barisan Nasional. Because to me, this is the most important thing: our real focus must be on state development and the well-being of the people, so that our state is stable and our state is prosperous. And this gives investors confidence to continue investing in Negeri Sembilan. And we can see the results very clearly. Over these two years, we have seen our revenue rise. Why has our revenue risen? Not because we raised taxes. Not because we increased the land tax rate. But because there has been continuous development and investment coming into Negeri Sembilan.
There has been the construction of new factories, and the purchase of new land, which certainly has had a positive effect on the state government's collection of land premiums. This is very clear in terms of our non-tax revenue: the projection for non-tax revenue for 2026 is RM372 million. Most of it comes from land premiums. The same was true over the past two years. So this is a sign that for us to continue this high level of revenue collection, and for the state government's target of reaching RM1 billion in revenue collection by 2030, is not impossible. But we must ensure that the investment climate in Negeri Sembilan remains positive, and we must be able to attract investors to continue investing in Negeri Sembilan. Only then can we achieve a higher tax revenue status. I also want to state that our position, our financial position, although it is good now, we must be careful. We must be vigilant, and we must realise that this strong financial position is not something that is given. There must be continuous effort to ensure that we remain able to spend. Especially in terms of financial assistance to the people, welfare assistance to the people, including to civil servants at state level. In Negeri Sembilan we have already reached a record: we have approved and tabled, the Honourable Sikamat tabled and proposed, a bonus or special financial assistance of at least two months to all state civil servants. And in addition, one additional month if performance is good, making us one of the highest states. So, perhaps other states are also now competing to see which state can pay a bigger bonus.
Sarawak only pays 2 months; Negeri Sembilan proposes 3 months. So the Honourable Sikamat is quite a champion. The bonus is higher than Selangor and Sarawak.
Nevertheless, we must be aware, and I also hope the civil servants are aware of this matter. I have no problem giving a high bonus to civil servants if the state government's revenue and performance are good. However, all parties must also realise that this higher bonus payment must also be accompanied by higher productivity. And we must strive as hard as possible to help realise the vision and also what the state government expects. If we want this to continue, with special financial assistance of 2 months, 3 months every year, we need to ensure that revenue continues. I want to remind you that the revenue we receive today is not something permanent. It must be based on continuous effort. Because if we look at the structure of our revenue estimates, tax revenue is only 28%. Non-tax receipts are 10%. And most of our revenue is contributed by non-tax revenue. And this non-tax revenue can change from year to year. It is not permanent. It is not the same as land tax. Tax revenue, land tax, is permanent. Land tax must be paid every year.
But, non-tax revenue, land premiums and so on, and also permits for quarrying and so on, depend greatly on the economic climate in our state. If investment does not come in, if no new companies come to build factories or make investments, land premiums will decrease. And if there is no development, the demand for quarry products such as sand, stone, and so on, will also decrease. So, all of this is an economic cycle that we need to understand. That if we want to be good, we want to be prosperous, we want to have bonuses every year, we must together make efforts to ensure this growth continues, and this development must continue.
So, I want to say that I expect the entire machinery of the State Government, both in this august House and in the state government administrative machinery, must work together and give full support to the state leadership to realise all plans and to ensure that stability in our state continues, so that development can go on and investment continues to come into Negeri Sembilan.
I am pleased to share in this august House a project that I attended last Saturday, where I, as Minister of Transport, was invited to officiate at a groundbreaking ceremony, because the project is related to the Ministry of Transport, which took place, or the project is in Seremban. Two years ago, I took the initiative to meet with the Sunway Group, the Founder of the Sunway Group, Tan Sri Jeffry Chia, to invite him to look at the potential in Negeri Sembilan, because under the agency of the Ministry of Transport, the Railway Assets Corporation has a 20-acre plot of land behind Seremban railway station.
Of course, we went through an RFP (Request For Proposal) process, tender and so on, and to ensure that the party that wished to develop the land would give the highest return to the government. After nearly a year of this process, finally, last May, RAC signed a joint venture agreement with the Sunway Group last May. Less than 7 months later, I am pleased to share with this august House that the groundbreaking ceremony was carried out last Saturday behind Seremban Railway Station, where the project is named Seremban Sentral Project. Where we want to collaborate with the private sector, in this case the Sunway Group, to develop a Transit Oriented Development project. The Ministry of Transport is redeveloping Seremban Railway Station, which will make the station more modern, better, with more complete facilities.
However, it is not enough if there is no TOD, or Transit Oriented Development, element. So after the RFP, RAC selected the Sunway Group as the joint venture partner to develop this Seremban Sentral Project. The components brought by the Sunway Group are, firstly, in the first phase, to build a private hospital, or a private medical centre, medical centre, which we know that in our country there are private medical centres everywhere, especially in big cities. In the Klang Valley there are many, in Melaka, in Johor Bahru, in Penang, there are indeed many of these private medical centres. In fact in Seremban there were also 2 or 3 private medical centres previously, but their scale was not yet large enough.
So, the Sunway Group has agreed and invested to build a private medical centre with 250 beds in the Seremban Sentral Project. In addition, not only a private medical centre, there will be an integrated development project, there will be a shopping centre, there will be a commercial centre, there will be office space, and in the second phase residential projects will also be built. So, this whole project will have a very large impact, especially on Seremban. And in the Seremban City Centre, our old city centre, which does not show much new development, because much development has taken place or is taking place outside our old city centre, especially in Seremban 2, in Seremban 3, in the Senawang area and so on. But
in our old city centre area, there has been no redevelopment for quite some time, and this is not redevelopment, this is a new development project, on a site that has been left idle all this time. 20 acres, because all this time it was reserved land under the Railway Assets Corporation.
Now we are using, or aaa… using this land to develop it, to make the place an important public transport hub for Seremban. And I think this will be a major catalyst for the development of Seremban City, and will transform Seremban City into a more modern city. Because my hope is that it will lead to the development of the medical tourism sector in Seremban, because the hospital and the project are adjacent to and will be integrated with Seremban Railway Station. Seremban Railway Station will become a very important station. Because, firstly, we will build a new station.
Secondly, the ETS Selatan will pass through Seremban station every day, repeatedly. Because, for the information of the Honourable Members, on Friday next, 12 December, a new history will begin in our country. Where the ETS Selatan service will start from KL Sentral towards Johor Bahru. The track has been fully completed, and on Thursday next, 11 December, the project will be officially opened by the Acting Sultan of Johor and also the Honourable Prime Minister in Johor Bahru. And on Friday, ETS services from Kuala Lumpur towards Johor Bahru will begin, and also from Johor Bahru towards the North. So, every journey will pass through Seremban. Because Seremban is a station that must be passed by the ETS Selatan before reaching Kuala Lumpur, or before going from the North before reaching the South. So, of course, we are a very important station on this route. And we hope that with the existence of this ETS service, it will encourage and bring more people, passengers, tourists and so on, and visitors to come to Seremban using the ETS. And with this ETS too, once the TOD project is completed in a period of 5 years, with the private hospital, shopping centres and so on, it can also help to catalyse and encourage the growth of medical tourism in Seremban. That is, bringing visitors or patients who want to get treatment at that hospital, using the ETS to come to Seremban and be easily integrated with the hospital.
So, apart from the ETS, of course the federal government is also repairing and redeveloping the double tracks between Seremban and Kuala Lumpur. And this project is expected to be completed in 1.2 years. And when it is completed,
the KTM commuter service between Seremban and Kuala Lumpur will become more frequent. I know the complaints from the public, especially those who live in Seremban and work in Kuala Lumpur, their complaint that currently this KTM commuter service is not very good. Because previously it could reach Kuala Lumpur in 70 minutes, 75 minutes. Now, every day it takes perhaps more than 100 minutes or almost 2 hours from Seremban to Kuala Lumpur. I do understand this complaint from the public, because at present there are tracks being repaired, causing us to be unable to fully use and optimise the double tracks in the sector between Seremban and Kuala Lumpur.
Nevertheless, the project is underway. And we hope this project can be completed more quickly and restore the double tracks as before. And when it is finished, the track will be better, safer, and better, and of course train speed can be improved. The same applies to train sets, or rolling stock, where previously we faced various technical problems. The federal government is also drafting a new framework to obtain more trains through a leasing programme. So that these train sets can be maintained better and in greater numbers, the number will be higher, and we can increase the frequency of trips between these main sectors. And of course, between Seremban and Kuala Lumpur, that distance and the time taken will be shortened. Making this train facility more comfortable, faster, and of course it will become the interest and favourite of users. And all this will bring a positive impact. And also an encouragement to the public to use public transport, using rail, to commute between Seremban and Kuala Lumpur. And it can generate more growth in Seremban, especially for the people of Seremban who commute to Kuala Lumpur and other places. I hope that with the support of the federal government, developing the public transport sector and developing this rail sector will become a growth boost to the economy of Negeri Sembilan.
So, Dato' Yang Dipertua, Mr Speaker, and Honourable Members, I hope this can be realised and used to the best possible advantage. Likewise in Seremban, apart from this TOD project, I also wish to propose to the State Government that we together look at and draft a strategy to elevate our services sector. What I mean by the services sector is, in terms of Seremban's location being close to the Klang Valley, close to Kuala Lumpur, in addition to the public transport network, which will be upgraded and better, we are one of the sectors that can attract the interest of large companies, namely the MMC companies, to
relocate their back-end operations, their back-end offices, to Seremban.
This is a trend we see in big cities. For example, operations such as accounting, HR and so on do not necessarily need to be carried out in the capital, and do not necessarily need to be run from offices in downtown Kuala Lumpur.
Call centres, for example, can relocate to cheaper places. And Seremban will become the choice for these companies. If we have complete facilities, if we have a good transport network, then we can also bring this distance closer and attract companies to relocate. And of course this will increase demand for office space in Seremban, where rental rates are certainly lower. And I am confident that once we can elevate this sector, we can attract more private companies to invest, to build office buildings in Seremban. What we generally see is that the demand for office space in Seremban is currently not very high, and this has resulted in over-supply and so on. So we must devise a method, a strategy, on how to attract these large companies, or these MMC companies, to consider placing part of their operations here.
We know that most companies, if they want to set up headquarters, of course want to set up in the capital in Kuala Lumpur or in the Klang Valley. But many operations can actually be carried out in places like Seremban, which is not far from Kuala Lumpur, and offers a higher value proposition to these companies, especially in terms of rental rates and so on. So, this services sector plays an important role in the economy of Negeri Sembilan. Nevertheless, we know that we cannot rely on just one sector. The economy of Negeri Sembilan depends greatly on twin engines, or these two engines, the services sector and the manufacturing sector. Because these two sectors offer the greatest employment opportunities to the people of Negeri Sembilan, to local children. So, we must move in tandem. We want to elevate the services sector, and we also want to advance our manufacturing sector. And the manufacturing sector, once again, Negeri Sembilan is increasingly becoming the focus. There are reports on social media stating that Negeri Sembilan has now begun to be identified as what is called a hidden gem. For a long time, people did not look at Negeri Sembilan in terms of investment and industry. Much was talked about in Selangor, in Johor, in Penang. But recently, Negeri Sembilan has increasingly become the focus. It is increasingly attracting the attention of large companies, including new manufacturing companies
that wish to look at investment and the opening of factories in Negeri Sembilan. Because we offer various advantages, in terms of geography, in terms of land, in terms of cost. All these are positive factors that can make Negeri Sembilan one of the main choices for foreign investors, and also for local investors. So, in this matter, we must continue our efforts. The Exco for industry must play a more active role. Of course, the Honourable Bahau, as Exco for industry, has already made the best effort, or given the best effort, to attract more investment and industry. So this must continue, because this is important for the economic development of Negeri Sembilan.
Nevertheless, I think, as I have stated before in this august House, if we want to continue to elevate the manufacturing sector of Negeri Sembilan, one of the important projects or factors is that we must elevate logistics facilities in our state. Negeri Sembilan does not have an airport. Because we have our airport, there is no need for an airport in Negeri Sembilan, because we are very close to KLIA. So the question of us needing an airport does not arise. KLIA is very close to Negeri Sembilan. We are just neighbours. Once you leave Nilai, you have already reached KLIA. So we have no question of needing an airport specifically for Negeri Sembilan. The demand or that condition does not arise. However, as I have stated, although we have a coastline, we have Port Dickson, we have a jetty, we do not have a container port in Negeri Sembilan. So, there is already private investment that wishes to invest in a container port in Port Dickson, and it has been approved. The Ministry of Transport has already given in-principle approval to grant an operating licence to this port as a private port. Not through a concession, because the land is not owned by the federal government. They are privately owned. So, we are using a private investment model. Granting them a licence. However, the construction of the port must be fully financed by that private company. And in this matter, the construction project for the AI Port in Port Dickson has indeed been approved. Only I am informed that the construction project cannot yet begin because it is still awaiting planning approval from the local authority.
I would like to ask the State Government, especially the Honourable Menteri Besar, what is the status of the planning permission from the PBT? Because this is not under the purview of the Ministry of Transport. The Ministry of Transport, in terms of the operating licence, is under the Ministry of Transport. In terms of technical studies, hydrographic reports, the marine risk assessment report and so on, these are indeed under the Marine Department. But to physically build the port facilities, that requires approval from KM or planning permission from the
local authority and also the state government. I understand that this is a joint venture project between the State Government and the party. So, land issues have already been resolved. Only now it is delayed, just the planning permission before physical construction can begin. I hope that the Honourable Menteri Besar and the state government will give greater attention to this matter. And I hope this planning permission can be approved as quickly as possible so that physical construction can begin. Because people do not believe until they see it. I know there are also parties who doubt whether it is true or not. A lot has been said. I have said it many times. The Menteri Besar has also said it many times. There is this port. But there is not yet any sign of construction. So that confidence is not yet fully there. Even though they see that the potential is so great if a port is built near Port Dickson, then of course the industrial areas around Port Dickson can be elevated. Moreover, with the planning by the state government that has been approved by MPFN, the National Physical Planning Council, to make that area an industrial zone and a main logistics zone under the Negeri Sembilan development plan under MVV 2.0. So, all of this requires people to see it physically, because I understand the psychology of many people. If they have not yet seen the project begin, then the confidence is not there. However, once the project begins, interest and confidence will come.
This is very clear. My experience in the Ministry of Transport, we talked about the RTS project in Johor Bahru. When we discussed that project, people were not very interested. People did not know, because it was still vague, they had not yet seen it. But when the project began to be built, they saw its wire path, they saw its department, crossing the Straits of Tebrau, so many private parties rushed and competed to invest in the Johor Bahru area. And this caused a major boom. Because they saw that the project was not just empty talk. It is something real, something true that has been committed by the government. So, in this matter, I think the consideration is the same. If this project can be started as quickly as possible, it will generate greater interest in the manufacturing sector in Negeri Sembilan, and of course can give greater confidence to foreign investors. I hope this can be given attention and can be started quickly. If possible, in the first or second quarter of 2026, the physical construction project can be officially started.
Lastly, Dato' Yang Dipertua, I would also like to touch briefly on the mining sector. I want to debate this matter from the perspective of safety. It is well known that I have already stated in Parliament and in the Dewan Rakyat, that the Ministry of Transport takes the safety of road users very seriously, especially in terms of
accidents that occur due to heavy vehicles carrying loads exceeding the limit. That is why, under the Ministry of Transport, we have launched a major campaign, a war against overloading, or against exceeding load limits. This matter is largely related to the mining sector, because among the causes, or among the sectors or subsectors where this overloading or exceeding of load limits is common, are the quarry sector, sand lorries, stone lorries, lorries carrying minerals. So, in this matter, we are indeed carrying out continuous enforcement operations. Much has also been carried out in Negeri Sembilan, and much has been enforced. There are also lorries that have been summonsed, impounded and so on in Negeri Sembilan.
So I hope for and I request the cooperation of the State Government. I understand that permits for quarries and so on are under the state government, because royalties and so on are paid to the state government. So, permits must be issued by the state authority. I hope that the state authorities, through the Department of Lands and Mines, and also the Land and District Offices, will review and tighten the conditions for these quarries, so that they also have aaa… have a responsibility to ensure that the mining materials or mineral materials coming out of their quarries do not exceed the permitted limits. Because if we want to fight the issue of exceeding load limits, which I am confident all Honourable Members agree with me must be fought, this must be addressed. The Honourable Labu previously raised a complaint in this August House regarding sand lorries, and I immediately instructed the JPJ, the Road Transport Department, to enforce and so on. But we cannot look at this from only one angle. Because enforcement certainly causes lorry drivers to be dissatisfied. Some transport companies are also dissatisfied. But this responsibility cannot be placed on only one or two parties. Not only on the lorry driver. The driver only drives the lorry. He is asked to drive the lorry because the load, or the product carried, is not under his control. Sometimes he is paid or hired to carry goods, to carry that cargo. So what is carried, the limits and so on, are sometimes beyond his control. So drivers have a responsibility. Transport companies have a responsibility. But we also want to place that responsibility on the consignor and consignee, that is, the owner of the cargo and also those who load the cargo. In this case, in this matter, for example, the quarry, the quarry operator, when they want to bring out a sand lorry, they know whether or not that sand lorry exceeds the load limit. So, if it exceeds the load limit, and the quarry owner allows that lorry to leave their quarry, then they must also be held accountable. In this matter, we at the Ministry of Transport level are still looking at how this legal framework can be drafted so as to also place that responsibility on the cargo owner. But I need, the Ministry of Transport needs, the cooperation of state governments, especially in terms of permit conditions for quarries. And also the responsibility of quarry owners. And I think this needs to be ensured. Because I also know that if we can address these matters together, this will also bring benefits to the state government, so that the dockets and also the premiums and so on paid to the state government are more transparent, and better reflect the actual amount.
I am not saying there are parties who are trying to cheat and so on. But if all this can be implemented more systematically, I think we will have an industry that is more transparent and better, and so that what we implement is not about closing these mines. We know that natural resources such as sand, soil and so on, silica, are important for industry, important for development. Without these materials, development projects cannot be carried out. We need stone, we need sand. We have factories that make glass that need silica and so on. But all this needs us to change with safer and more transparent methods of operation. And we hope that the state government can provide cooperation and give assistance to the Ministry of Transport to ensure that we have a safer industry.
Mohon mencelah.
Because this is a good thing.
Honourable, may I ask to interject briefly?
You have to stand up first.
Ah… ok…
Baik
Alright... thank you. Honourable Chennah, aaa... I did indeed raise the issue of heavy lorries. And thank you to Honourable Chennah for taking swift action. Recently we have also seen many lorry drivers staging strikes, eh... But what I want to ask Honourable Chennah is this. We are well aware that when there is very strict enforcement, that is a very good thing for the public, and recently we have seen many accidents happen. But how do we overcome the very high increase in transport costs at this time?
If we look at recent prices, I see that the price of YTL, the price of concrete, if I am not mistaken, for Grade 25 has risen from RM220 to RM354, an increase of almost RM100. From the time MADANI took office in 2022, the increase is almost RM180. This ultimately places a burden on the people. If we look at housing costs now, they are rising sharply, and one of the main factors is transport, which is very high. Secondly, is the State Government prepared to also give room to mineral entrepreneurs, including concrete or sand, by reducing the rate of the levy (loket) that is imposed? I have been informed that the levy rate has increased from perhaps previously RM2.70 per cubic metre to now almost RM4.00 per tonne. If we can cooperate, I think in the end we can find a good solution. If not, the impact and burden will ultimately fall on the public too. Thank you.
Honourable Member, we have to look at this matter. I have heard arguments like this many times already, including in the Dewan Rakyat. If we do not carry out strict enforcement, Honourable Members of the opposition will also blame the government. When accidents happen, aaa... they say this Minister of Transport is not working. The Ministry is not doing its job. The Road Transport Department (JPJ) is not enforcing. This causes various accidents. So when we take firm action to enforce, Honourable Members on the other side say, aaa... this will cause costs to rise. We must remember that if costs rise because of transport, and they say, "I am now carrying out enforcement", then did they, before this, make cost calculations based on the limit that exceeds the load capacity? So, first of all, I have discussed in Cabinet with the Minister of Domestic Trade and Cost of Living. The Ministry of Domestic Trade and Cost of Living (KPDN) will step in. KPDN has indeed already stepped in, to investigate. If any party tries to take advantage, takes aaa... the pretext that transport costs force them to raise prices, that is certainly profiteering, which must be acted upon by KPDN, and KPDN will certainly step in.
And I know that in the first two or three weeks, there was indeed a reject reaction. They raised prices because they said there was nobody willing to carry the goods. Strong enforcement and so on. But I am informed that big companies have also already adjusted the rates for drivers and transport companies. If the price of cement and so on rises, KPDN will step in, to ensure that they cannot profiteer. It does not make sense, let us say he raises prices, if indeed what Honourable Labu said is true, that it rose by as much as RM100, 50-60%. Surely transport costs are not 50% of the material. That is not logical. So this is something where sometimes industry players take the opportunity. I know that now, the easy path, the easy excuse for the industry to raise prices, is the Minister of Transport. This Minister of Transport... this wicked person, wanting to enforce strict laws, troubling us. Wanting the JPJ to arrest every single day. This causes transport costs to rise. He uses that reason to raise prices. This is profiteering. So if Honourable Members of the opposition who are responsible in this matter take a responsible stance, let us fight it together.
Yes, there are drivers who go on strike and so on. They do not understand that what we are doing is actually good for drivers. They should not strike, they should support it. But they are being instigated by small groups to strike. Coming to Parliament and so on. Should we turn back on our word? Should we be lenient in this matter? No. I will not yield to requests for us to bend the rules or not enforce the law. No, because for drivers, if they are vehicle owners, lorry owners, then if we enforce this firmly, it can change this industry for the medium and long term, and it will be better for them.
Firstly, lorry drivers will receive a higher wage rate that is proper. They have been asked to carry overloads. So that rate is pressed down by the big companies, by the big industries. In fact, the big industries should allocate funds for rental rates and proper wage rates for lorry drivers and transport companies. But because all parties overload, and we have had no firm enforcement before this, all parties race to overload. Overloading makes the transport rate lower for the big companies, but the ones who become victims are the transport companies. The individual lorry drivers. Firstly, when overloading is enforced or penalties are imposed, they have to pay summonses.
Secondly, it is unsafe for them. A driver who carries an overload, when an accident happens, the driver also faces a high risk of death. Not only the deaths of others, but that driver also faces a high risk.
Thirdly, for their vehicles, when they are forced to carry overloads, or beyond the load limit, their axles, their components, wear out faster. The lorry cannot hold up. Because of course there are technical requirements, and we know how much load a lorry can carry. When it is loaded beyond capacity, and, Honourable Members, this excess load is not 10%, 20%, if it were 10% or 20%, for us, we could still say this is not something serious. But there are excesses of up to 80%, up to 100%. This has been very widespread before. Especially tipper lorries, sand lorries, stone lorries. Their load, they modify their sides, raise the sides, load it until full, sometimes it is still not enough, so underneath they change it again, the bottom changed, the top changed, the bottom they deepen, the top they raise, so the load reaches 80% to 100% over capacity.
So I have had to take a firm action. I know I am unpopular among industry players, among drivers, there are all kinds of drivers, every day they want to threaten strikes. There is one person on social media who attacks me every day and so on. But for me, I must do what is right. For me, the safety of the people is more important than anything else. And do not forget, the Most Honourable Member the other day said, we presented how much MARRIS allocation we used in Negeri Sembilan. On this matter I congratulate Negeri Sembilan. Indeed Negeri Sembilan is among the states that perform best in terms of MARRIS allocation. We spend the MARRIS allocation to maintain our roads, and it is clearly seen that state roads within Negeri Sembilan are better compared with other states. I will not compare with which state. But Negeri Sembilan is far better in terms of road maintenance. And we practise a very transparent system. There is a draw like a lucky draw. Ping pong balls are used to select contractors, so that many contractors get a chance. So much has been spent to maintain roads. But if we do not tackle this overloading issue, every year, even with maintenance, it is not enough. Ideally, once a road has been maintained, for 5 years you should not need to look at that road. But why do our roads deteriorate so quickly, with so many potholes? One of the causes is overloading. So this is something that Honourable Members must understand, the seriousness and also the impact on society. The impact is very large on other factors too. Safety is one, road damage is one. We often hear of children, of motorcyclists, sometimes young people, school students, who hit a pothole, a pothole they cannot see at night, the area is dark, they go over a pothole, fall, perhaps die. Seriously injured. So why are there these potholes? Our roads are so easily damaged, even though they are maintained. Among the issues, among the factors, I am not saying it is the only factor, but among the contributing factors is widespread overloading. So this is something we must tackle.
Honourable Members, six months ago there was an accident that caused the deaths of 9 members of the Federal Reserve Unit (FRU), 9 FRU personnel, in Teluk Intan. Why did they die? The truck was travelling in a convoy of more than 10 vehicles. In the opposite direction, a lorry carrying stones, 70% overloaded, lost control, crossed into the opposite lane, and hit the FRU truck. The FRU truck also overturned. When it overturned, because the FRU truck had no seatbelts, dozens of FRU personnel inside the vehicle were thrown about, trampled and so on, and some were thrown out. 9 FRU personnel were killed, died. Because of one act of negligence by a lorry that took an excessive load and lost control. So this matter should be a lesson to us. Why am I firm on this matter? I am firm on two matters. One, overloading. Second, speeding. Why do we take firm action on speeding? To make it mandatory for everyone to install speed meter devices? The UPSI bus 15, I... aaa, more than 10 students died. Why? Because the driver came down a hill, drove fast, drove fast, lost control and hit a roadside barrier. Many UPSI students died in that incident. So this kind of thing is a human factor. So we must together take lessons, take warnings, I do not want, we do not want to see, I am sure all of us, all the people, do not want to hear of incidents like this. FRU personnel die, IPTA students die because of accidents.
So, for matters like this, we must make changes. Sometimes there will indeed be other impacts, other effects. But what is more important than human life? This is my question. What is more important than human life? So we must all cooperate together. I hope Honourable Members, both Government and opposition, will together spread this exposure and this awareness to all parties, including lorry drivers. Including transport entrepreneurs. Let us work together, let us cooperate together. And I hope this matter can be handled together. Even though there are various objections. There are various pressures. But I am confident that if we have the courage to do what is right, we can show results that this improves road safety and the safety of the people, and I am confident that the majority of the people will support the government's action. So my message is simple, I will not yield to these actions, let various associations and various industries come and meet me, I will meet them, I can meet them. There are associations, but not through thuggish ways. They want to threaten, they want to meet and say you must cancel the summons, you must release any vehicle that has been seized, that is thuggish behaviour. Threatening behaviour. The Government cannot be threatened. We simply implement and enforce the law. This is a country governed by law. We have the Rukun Negara, the rule of law. The law is supreme. So we, as members of the administration, as the government, must together strengthen our law. We must implement our law. So this law is not being enforced without prudence.
Some say this is a new policy, and there is no time given. This is not a new policy. This law has existed for decades. The Road Transport Act was enacted in Parliament in 1987. When I was just 10 years old. Now I am 48 years old. Dato' Yang Dipertua, it has been 38 years since that Act was enacted in Parliament. The JPJ Act, the Road Transport Act, Act 333, 1987. This year marks the 38th year. This is not a new act. It is not a new regulation. Overloading is an old issue, a legacy issue. For decades, but it has never been tackled or handled in an integrated manner. Now we want to fight it together. Enough with the deaths and the safety that has already been affected by this issue. So, I hope the State Government can also give cooperation. I request that if there are engagement sessions with the State Government, I request that the State Government cooperate with the Ministry of Transport, so that together we can see how to fight this issue better.
So, Dato' Yang Dipertua, I apologise, I have taken quite a long time in this debate. I am confident the State Government has also allocated three days for debate, so there are many more opportunities for debate, at length. With these words, I respectfully move to support the Supply Enactment Bill (2026) 2025 and also the Development motion for next year. I support, Dato' Yang Dipertua.
Thank you, Honourable Chennah. The sitting will take a short break. We will resume at 2.15, eh, 2.30. We resume at 2.30, yes. The sitting of the House is therefore suspended.
[The sitting was suspended at 12.48 p.m.]
[The sitting resumed at 2.35 p.m.]
The Honourable Datuk Deputy Speaker of the House.
Assalamualaikum WBT, salam sejahtera. Calm, calm. Bismillahirrahmanirrahim innahu duwana rasulillah hil kareem. I begin with a pantun, eh...
Pohon meranti tegak berjajar, Standing meranti trees in rows, Tumbuh megah di tepi perairan, Growing proudly by the waterside, Perbahasan ini kita selesai segar, Let us conclude this debate refreshed, Pembangunan bangsa terus jadi keutamaan. National development remains the priority.
Air tenang jangan disangka, Do not assume still water is shallow, Dalamnya menyimpan rahsia tersirat, Its depths hold hidden secrets, Perbekalan negara, negeri terus dibawa berbicara, National and state supply matters continue to be discussed, Moga keputusan menjadi manfaat. May the decisions bring benefit.
With that, we continue the debate on the Development and Supply Enactment Bill. I invite the State Assemblyman (ADUN) for Labu to speak.
Thank you, Datuk Deputy Speaker. Assalamualaikum WBT, peace and greetings, respectful greetings to Datuk Deputy Speaker and to the honourable members of this House. I stand today as the State Assemblyman (ADUN) for Labu, the Ahli Dewan Undangan Negeri Labu, representing the voice of my residents, the voice of Labu, and also the voice of the people of Negeri Sembilan who share the same problem. I stand here not merely to bring complaints, but to bring a trust, a responsibility, and the truth that the people want us to voice in this noble House.
Datuk Deputy Speaker, Alhamdulillah, recently the Right Honourable has announced the Special Financial Assistance (BKK) for three months, namely the first payment in January, the second payment in March, which is before Hari Raya Aidilfitri, and the third payment in June 2026, subject to conditions based on work performance. We, on the opposition side, are Alhamdulillah grateful for the special financial assistance given, which can give and appreciate the services of civil servants. Here arises only one problem that I wish to raise. What exactly is it? Are the work performance assessment criteria that determine eligibility for the third BKK payment in June? We are not talking about corporate bonuses; we are talking about state civil servants, the backbone of the administration. Therefore, it is unreasonable for the government to announce conditions based on performance. But until now it has not detailed what is being assessed, how it is assessed, and by whom the assessment is made.
Datuk Deputy Speaker, when the government sets performance conditions without clear guidelines, it opens room for the perception that decisions may be vague, subjective, and potentially influenced by non-work factors. Justification based on performance must not be left vague. If the government truly wishes to assess fairly, then the government needs to clearly present the following matters.
First, what are the actual key performance indicators (KPI)? Do they involve departmental achievement, service delivery efficiency, discipline, or merely internal reports without objective measures? Who assesses? Is it the head of department, a special panel, or is there an independent monitoring mechanism to ensure the integrity of the assessment? Second, what is the standard for determining whether someone is eligible or not? Is it 80% achievement? Is it a certain mark, or are decisions made at discretion without written guidelines? Written guidelines. Does this plan distinguish between departments with heavy workloads and departments with light work, or is everyone placed under one and the same yardstick? What is the appeal mechanism for civil servants who feel they have been assessed unfairly?
Honourable Deputy Speaker, we want to ensure that this BKK payment does not become bait dependent on political discretion or conditional bonuses that remain unclear. Instead, it should be a clear and fair reward, based on genuine merit, not perception or the preferences of certain parties. If the government truly appreciates civil servants, as said by the Right Honourable Menteri Besar, that the assistance or services of civil servants in Negeri Sembilan are very great. I would have felt that it should simply continue to give three months without regard to merit or work performance in June.
Dato' Speaker, the third BKK payment in June 2026 is not merely a monetary issue. It involves sincerity, accountability, and administrative integrity. Therefore, I request that the government explain in detail the basis, indicators, and method of assessment used to determine the June BKK payment. So that civil servants know they are assessed on their work and not on other factors. Datuk Deputy Speaker, I support it if the government can continue to give three months, so that there is no difference in June, where some receive and some do not. So that is not like what was meant by the Right Honourable Menteri Besar, that this payment is based on the effort made by civil servants. So we, on the opposition side, agree that if the Menteri Besar can consider that the payment in June is on merit, it need not be based on work performance factors.
Datuk Deputy Speaker, I now move on to my constituency, Labu. Dato' Deputy Speaker, I wish to bring this noble House a matter of safety, namely Jalan Enstek from Taman Gadung Jaya to Bandar Enstek, sorry. A road that is dark, and recently, within three to four months, many fatalities have occurred. So, I request that when I went to that area recently, just two days ago, at the LBJ junction, a motorcycle accident occurred, a child died after being hit by a trailer due to road infrastructure factors which, in my view, are not very safe, given that the route in the Gadung and Enstek area leads to the airport. Many cargo vehicles pass through, and it is close to the village. So, when I met residents of the area, Honourable Member, the road is too dark, so dark that people say that to pass through they must recite a long prayer. It is not just one or two accidents, but they have happened repeatedly, including accidents that claimed lives. This is not a small issue, Datuk Deputy Speaker, this is an issue of human life. I want to ask in this House, how long will this road be left dark? How long must we wait for the next death report? How long
will JKR (Public Works Department) say there are plans, there are actions, but no change on the ground? I urge JKR. First, install street lights along the whole stretch of Taman Gadung Jaya-Bandar Enstek. Do not do it halfway. Do not wait for additional budgets for years. Second, ensure that other safety measures are given attention. Clear road markings, road shoulder reflectors, and the narrow and uneven road shoulders. Upgrade traffic lights at critical junctions to reduce congestion and the causes of collisions. Speed warning systems in high-risk areas.
I thank JKR. Recently, in the previous State Legislative Assembly (DUN) sitting, I raised the issue of the traffic light in Taman Gadung after 10 years. Alhamdulillah, it is now functioning. But I request that Labu is also the border between Sepang and also Negeri Sembilan. But if I look, development is only in the Nilai area, while in Enstek it is denied. Although we are close to the airport, only a distance of 10 minutes. So please do not let the MARRIS allocation only be brought into the Nilai area alone. If possible, bring it into the Labu area. This is a safety issue. Jalan Gadung, I am confident that the honourable members, including the Exco members who have passed through this road, know that Jalan Gadung to Enstek is extremely dangerous. So, I request JKR in particular to give serious attention to this matter.
One more matter, also concerning JKR. I do not understand. Many, the Right Honourable Menteri Besar has just answered, but I do not want to ask a supplementary question, I want to speak within my own time. JKR reserve roads. Many JKR reserve roads are now not allowed to be leased. For example, in the Labu Jaya area, there are two roads. The first is a new road. The second is an old JKR road that is no longer used. On the left and also on the right they have been cut off. And many LBJ residents have been using that area for a long time, for nearly 20 to 30 years of trading. And they have business licences from the Local Authority (PBT). But now, when they apply for business licences, they are not approved. Because there is no approval from JKR. So, I feel this matter is really not right. For me, Datuk Deputy Speaker, I want to emphasise here that JKR and also other agencies are not merely trustees of land. They are not merely land holders. They are trustees. And that trust includes using discretion to help the people and not to burden the people. I ask JKR and other agencies to identify reserve land that is safe for use and open it for community use, establish flexible guidelines. Not guidelines that kill opportunities. Work with the District Council to issue temporary licences or community permits. So, I ask that if there are JKR officers present today, reconsider and do not reject outright. Now, the people are struggling, and I feel this is not happening only in Labu. Recently, a friend from Kuala Pilah also called. They received the same matter. They have been trading for a long time. If by the roadside, at bends in the road, we understand. But if they trade in areas that are fairly safe, please allow it. That too is an opinion for the state government. Perhaps next year it can be increased to 4 months of bonus, insya-Allah.
Datuk Deputy Speaker, another matter that was raised in the previous DUN sitting, and was also answered by the Exco. I wish to go into the issue of MyKiosk Madani. I feel that for nearly more than a year we should have discussed it seriously. Negeri Sembilan has many kiosks. But the people's question is why so many MyKiosks are not used. Some kiosks have been left empty for up to a year, rusted and damaged, and in the end the government has to spend more to repair them. What is the state government's plan, is this a waste? Is this MyKiosk Madani a success? It involves one, a MyKiosk is not cheap, one MyKiosk involves RM25,000. I do not know who approved it before. Or, if there is no road, we need to think of other mechanisms, perhaps suitable for use for other business matters. We cannot let it be like this. In Labu there are 5 MyKiosks placed at Kampung Jerangkang. I ask the Exco to pass through the Labu area, Kampung Jerangkang, from Nilai, look to the right. There are 5, for more than a year now. Who wants to trade there? If possible, move them. Move them to a location that is livelier, more active. More opportunities for the people. Insya-Allah, the people want to trade.
And the second, slight change. If possible, allow them to cook inside. If they cannot cook, I feel that in another two years there will be a tender opened for scrap iron for these kiosks. The value is not small, Dato' Yang Dipertua. Nearly RM25,000 for one kiosk. If 100 kiosks, that is already RM2.5 million. Surely we are not going to let the people's money be left like that? So I ask all the ADUNs present today to look at their respective areas. Together let us find a way, let us help the people. Enough, people who want to trade by the roadside are not allowed. Kiosks that are placed cannot be used for trading either. Placed in areas that have no potential. So I hope this matter can be taken seriously and we can resolve it. Hopefully in the upcoming DUN sitting, there will at least be a sound answer from the Exco, insya-Allah.
Datuk Deputy Speaker, one more matter. Recently I was approached by people in my constituency, asking for signatures on a verification form for the Welfare Department (Jabatan Kebajikan). After that, they came to meet me again, saying, YB, why was the YB's signature not accepted? They were told to get the coordinator's signature. The State Assemblyman's signature is not accepted. I went straight to the Welfare Department in Seremban 2. I referred to the officer concerned. I asked him two questions. The first, is it true or not? If true, who? And he answered, sorry YB, I am carrying out instructions. The instruction came from the Exco. I want to ask the Exco concerned.
May I interject? Just a short interjection. May I?
Boleh.
Aaa… the ADUN for Labu, this signature problem, aaa… from 2008 to 2018, at that time we had 10 DUNs, and the government forms, we could not sign them. At state level. This is true and valid. Thank you.
Honourable Member for Seremban Jaya, if the Honourable Member still remembers the Honourable Member's election promises, in 2014, if we win, we will not repeat anything done by the previous government. So I think the Honourable Member should answer first: when the Honourable Member was in the opposition, the same thing happened, how much do we repeat? This is not an allocation. This is the Honourable Member who has joined. Everything has been reset to zero. How long must we keep repeating? The people who come to my area are poor B40 folk. They come from nearly 20 km away, come for signatures, go to Seremban 2. When they submit, they come back and are told it cannot be done. So I request, I agree. Honourable Member, if it is still practised by the government….
May I interject? It is not that it cannot be done, it can… Honourable Member for Labu. They only ask for verification from the State Assembly Coordinator. It is not that it cannot be done, it can. Please correct that statement. OK?
Honourable Member for Jeram Padang, that is why I said listen carefully. I said the Honourable Member for Labu's signature cannot be used. What can be used is the coordinator…
Yes, I said it, I said earlier, it is not that it cannot be done. They ask for verification from the DUN coordinator. That is why there is a system in the Negeri Sembilan State Government. If the Honourable Member for Labu wants to question it, earlier in the Terengganu State Government, under the PAS government, we wanted to give FELCRA dividends in the mosque, and they did not even allow it. Yet they could allow chasing people away at the beach.
Honourable Member, I….
Can you answer that issue?
I have never been an ADUN in Terengganu, dohh…
It is not his issue.
What I am talking about is Negeri Sembilan.
Aaa…. It is Negeri Sembilan now….
….. follow lah…
No, you are the opposition, accept the situation, eh… follow the rules of the Negeri Sembilan State Government.
I… that is clear.
That is his issue.
In this State Legislative Assembly sitting, this noble House, the column for the Honourable Member on the forms in opposition areas should not be filled in, just fill in the coordinator.
You are the Opposition Honourable Member, Opposition Honourable Member.
I will not give space any more. So Dato' Speaker, if it cannot be done, the forms in these opposition areas should not be filled in yet. Put the coordinator; in the Labu area it cannot be done. I challenge the Honourable Member for Sikamat or the government to state in this State Legislative Assembly sitting, so that the people hear, that next time they need not come to the opposition ADUN's office. So just now we can take it that it means on the government side, yes, this representative of Jeram Padang agrees that government ADUNs cannot sign the forms.
Agreed… (quiet voice).
Dato' Yang Dipertua, next I want to, aaa… the year 2026 has been declared the Visit Negeri Sembilan Year. An important moment to uplift the dignity of the state, boost the tourism economy, and show the whole country that Negeri Sembilan is not merely a stopover, but a destination. However, the question this time is, if this is an important year, why are the entry routes into Negeri Sembilan still empty, silent, and without identity? At the landmark, where are our landmarks? Where are the proud signboards welcoming visitors? Where is the state identity that should stand tall at the border, informing whoever enters: welcome, this is the Visit Negeri Sembilan Year 2026. What exists now is only an entry road that looks like an ordinary route. As if this state is not ready, not enthusiastic, and worse, does not respect the great sacrifices made by the State Government itself.
Dato, Deputy Speaker, the Visit Negeri Sembilan Year is not an empty slogan. It is an economic strategy and future investment. It is an opportunity to attract investors, traders, tourists, and to enhance the state's image. But how will the world believe we are serious, if the front door of our house is not even looked after? A house that welcomes guests with neglected fences, unlit compounds, and doors that have not been repainted? Is that the picture of a state ready to receive visitors? The State Government must answer, is the Visit Negeri Sembilan Year merely an event or a paper exercise, or a real agenda for the people? If serious, show that seriousness. Landmarks are not merely stone or iron. They are symbols of commitment. Other states erected landmarks even before the announcement was made. We, meanwhile, have the visit year right before our eyes.
Honourable Member, two more minutes, Honourable Member.
Alright. The landmark is still in the planning stage. This is not a domestic matter; it is a matter of image, dignity and the consistency of the government. If the Negeri Sembilan Visit Year is to succeed, let the world see that we are truly ready. Not just through plans on paper, but with a landmark that is seen, touched and taken pride in as the gateway into our state. Do not let the Negeri Sembilan Visit Year be remembered not for its success, but because its own gateway never reflected anything at all. What I mean to say here, to the Honourable Exco Member, is that I hope there will be one immediate action so that Negeri Sembilan is visible from its gateway, so that people know 2026 is the Negeri Sembilan Visit Year. Do not let them enter and simply pass straight through. It should have been put in place right from the start. 2025 is almost over, and in 2026 most people will come from the airport and pass through Nilai, and the Nilai state constituency will not be stopped at. They know nothing at all. So I feel matters like these should be resolved earlier, God willing.
So, Deputy Speaker, today I stand before all my friends not to engage in empty words but to uphold the rights of the people of Negeri Sembilan. The rights of an Opposition State Assemblyman. If we cannot get everything, let us at least get a little. If things have been repeated again and again, let us stop. Let us stop doing it, because we serve the people. I am not here to debate, but in my view it is an improper action if the letter of support…
Aaa… Leader of the Opposition, I would like to add a little, eh…
Time is up already….
I think….aaa… just a little. Just 1 minute… I want a little clarification, about the signing just now. Because I am at the office, if the Social Welfare Department (JKM) sends people to be signed, we sign, and even up to today there are people asking to sign.
That too is not effective…
I want a little clarification: is our signature not effective? If it is not effective, then if they go and trouble them, it would be better to go to the State Coordinator. That is also something I want clarification on, yes.
So that is what I meant, Dato’. I have been the Honourable Member for almost 2 years or more, and only now do I learn that my signature is not valid, right? Only now do I learn that a signature is not valid. That is why we ask in this august House. This is the place where we can get an answer. If it is not possible, then just say so, so it is easy for us to answer our voters. God willing. Honourable Dato’ Speaker, the people do not need excuses, do not need useless forms, and do not need empty symbolism. They need concrete action, not political bureaucracy. Do not excessively deny the opposition. Do not let the people continue to be burdened with unfairly heavy procedures. Today I affirm that if the State Government fails to act, the people will not forget. History will record who truly served them and who merely played politics. The people of Negeri Sembilan have waited far too long, and we, the Opposition State Assemblymen, will continue to stand and ensure their rights are fully defended.
Honourable Deputy Speaker, not sweet words, not empty promises, but the voice of the people that cannot be silenced. And believe me, the state government will always be monitored by the people. Every paper, every form, every signature and every promise, God willing. Thank you, Deputy Speaker. Assalamualaikum WBT.
Waalaikumussalam.. thank you. I invite the Honourable Member for Seremban Jaya to continue the debate.
Deputy Speaker, thank you. I congratulate, I praise Longgeng, Honourable Dato’, because today is historic, you have now taken that seat, and I certainly congratulate you.
You have only spoken twice.
Okay….aaa thank you for giving me the opportunity to take part in the debate on the budget of the Third Meeting (Budget) of the Third Session of the 15th Negeri Sembilan State Legislative Assembly. Tabled by the Honourable Menteri Besar of Negeri Sembilan, the Budget 25, 26. Indeed I congratulate and praise it. Aaa… so, in this regard, the State Government proposes to this august House a 2026 budget with estimated operating expenditure of RM640 million. Compared with estimated revenue of RM610 million, the allocation for estimated development expenditure is 150 million ringgit. The 2026 budget proposed is a deficit budget of RM30 million. aaa….. aaa…. aaa…
Deputy Datuk, my neighbour is always late. I must apologise. Okay. But Chembong is very, very good-natured. When we go down to Pedas, Chembong’s people serve teh tarik. Thank you. Okay. aaa… Deputy Datuk, this august House, I mean this august House, in 2018 the budget was RM412 million. 7 million went up before that. 2019 RM430 million, 18 million went up. 2020 RM457 million, up 27 million. 2021 RM560 million, up 103 million, but in 2022, because of the Covid pandemic, which was a problem for the whole world at that time, RM520 million, 40 million went down. But in 2023, RM550 million, 30 million went up. 2024 RM555 million, 5 million went up. 2025 RM590 million, I mean 35 million went up. Indeed it went up. Our Honourable Menteri Besar, Senior Exco, Exco members, Dato’ SS, Dato’ Kewangan, Dato’ Undang, and the Government staff, the government officers, I want to congratulate them, I want to thank them. Sorry-sorry, I often make mistakes, this and that, in the House I often say wrong things. aaa… Legal Officers. I change this today. Not change, speaking the truth, Legal Officers. Okay, okay, okay, Dato’, thank you. Okay, 2026, 2026 is indeed a big budget in Negeri Sembilan. I say a thousand thanks and congratulations to the State Government, RM640 million, 50 million went up. Indeed I want to thank, I want to congratulate.
So the State Government in the past years has indeed shown evidence of economic policy and allocations for the people of Negeri Sembilan. What we promised, before 2018, before the election, all the manifesto items have been fulfilled. Now senior citizens can also receive RM200, those aged 70 and above. On their 70th birthday, they can receive it. During Chinese New Year, we give to the Chinese. During Raya, we give to the Malays. During Deepavali and Christmas, we give to Indians and Christians all at once. This time, for the Seremban Jaya state constituency, I want to say a thousand thanks to Dato’ SS, who was willing to come down to Seremban Jaya. The senior citizens called him to sit, we served food, we put down leaves, we served them food, and they were all very happy. For that I want to thank the State Government, the Honourable Menteri Besar of Negeri Sembilan, the Exco members, Dato’ SS, aaa… likewise aaa… Dato’ Kewangan, and all the Legal Officers. Okay, thank you, Adviser, the Legal Adviser, we thank them. Moreover, we thank the government staff too.
Okay, now, my state constituency’s problems. The problems of my state constituency have always been, before my state constituency, there were 2 matters, one abroad, one outside the district. I wish to record that just now I already congratulated, last minute got …. A little. Dato’ Yang Dipertua, Deputy Datuk Yang Dipertua, I also want to draw attention to the new investment development in Port Dickson. Just now the Minister of Transport, State Assemblyman Chennah, also informed us that this investment will open many job opportunities and attract many companies to invest in the area. Therefore I propose that the state government, through MBI, this is my proposal or my view, whether it is possible or not, whether there is an act or law, I do not know. But my proposal, this House today, just now our Deputy Speaker sat here, I want to say. MBI buys land on the plantations throughout the port area there or Jalan Rantau, Rantau to Linggi. There are estate lands, we can buy that land, and we store it now. Buying that land is not a loss, because it generates income; now there is income, there are oil palms. Give to good contractors, indeed there is income. Especially the Sime Darby Guthrie land, the purchase can be made through a bank loan, whether MBI can or cannot, I do not know, through a bank or other financing method. If this land is owned earlier, we can develop factories, warehouses, or affordable housing for workers when the investment begins operations. I also want to stress that only factories that do not pollute the environment should be allowed. We should give priority to electrical, electronic and clean industries, and not allow factories involving hazardous chemicals. This is important to protect the health of the people and the environment. This step will, okay, two, attract more workers and investors. The economic development of Port Dickson is already within our Honourable Menteri Besar’s area. Our Honourable Menteri Besar is very good, his name is already in it. That is indeed God, very good. Very good-natured person. Later I want to go to India to borrow a little.
Calm down, calm down, calm down, we ask the Honourable Member for Seremban Jaya to continue, everyone else please calm down, okay.
Okay, okay, okay…. I give a warning to Chembong. Those who help the state reach budget targets. Every day the MB's mind, thoughts, day and night, remember this, Honourable, this august House, one day, one billion ringgit of budget. aaa… this is indeed the Honourable Dato’ Seri Utama’s thinking, indeed aaa… that is my view, I am confident with these steps that Negeri Sembilan will continue to progress and develop. Okay.
This is overseas, this is not Malaysia, this is overseas. But overseas, there are things that enter the state. In Malaysia's state, there will be later, I want to take this opportunity to debate a little about the proposed tourism development at Bukit Putus Bridge. The second highest bridge in Malaysia, but many people do not know, because over there, cars cannot stop, there is a signboard. One signboard can be seen. From Seremban towards Kuala Pilah, you can see that signboard, but you cannot read it because cars are fast. Because in Malaysia vehicles do not go slowly. Speed, once it is fast you cannot read it. Right side, from Kuala Pilah towards Seremban, you cannot read it. Because our brother Arul also does not, I want to tell him. This, all the trees, you cannot see it. The signboard is there, but the writing cannot be seen. Tell MBS, please help, aaa….
please help. JKR too…. aaa, like that, JKR please help. Okay, okay, okay, okay……
Deputy Speaker, thank you for giving me the opportunity to speak. A few weeks ago I went on a working visit to China, together with the Exco for Tourism, Saudari YB Nicole Tan, Exco. One important place we visited was Shanghai, an area now well known as aaa…. an international tourist destination. However, what many do not know is that Shanghai was originally just a small fishing village. aaa… when a person, a rich man, came to visit and saw that the place was a village. But that village, the houses were all, say, 200 metres, 500 metres up on a hill, they looked, okay, he planned, he called the village people to sit, and discussed. I want to make a good plan, you people from the hill want to come down, children find it hard to go to school, it is hard to go to the shops, hard to eat, hard even to go and eat at shops, hard to buy things, I will settle all of this. He called all the people, and said, at one place I will build houses, you people live here. I will build it traditionally here as well, nicely. Nicely I built it. Okay, 60% agreed, 40% did not agree. Then after discussions, the houses were completed, and the 40% also agreed. All 100%. Now those people are rich and luxurious. That place is beautiful. Hundreds of thousands of people visit that place. Aaa… In the same way, I ask that this bridge, that bridge, that place, I think the place is, the State Government’s place. When we are up there, in Malaysia, the second highest bridge, people do not know, many people do not know. I think aaa…. that road is always used by our State Assemblymen more or less, you know. Because they always see it. But up there too, below, nobody sees it. That is why we make that place beautiful, build roads, there are food shops over there. Okay, food, Malay shops, traditional ones. One place for Chinese food. One place for Indian food. One place for Indonesian food. We build all of them there. That can be done, but earlier I said, the Honourable Member's near there, those animals, he said not suitable… But I think that place may be suitable a little. Those snakes, earlier there were also snakes, anaconda, anaconda, anaconda was over there. But now none, those snakes, nobody knows where they are. Anaconda aaa…. anaconda. Anaconda or, what conda, I do not know. But, let us see how, that place later will have many people. People from all over Malaysia can go there. They can visit the tourism place. We can do it, I think, my view, my proposal, I think Dato SS or the Forestry Department should go and look at that place, whether it is possible. Now we do not need to go down, there is a drone, right? That can also let us see. Aaa… but that place we can make into a beautiful tourism spot. Aaa… that is one.
Another thing, aaa… this is a bit more serious, but I want to thank the local authority, Seremban City Council, now they have settled many problems, I thank them. But now, frequently, there is this problem in my area, manhole covers of TM are often opened by irresponsible parties for the purpose of cable theft. This is often my area's problem, so I ask that Seremban City Council or TM please take care of security, often, because I am afraid one day someone on that road, they might be on motorcycles, something might happen. Something unthinkable might happen, that is a big problem, or if staff are injured, who will they sue? They will surely sue MBS, and then we will be the ones affected. They will sue MBS. Then MBS will have to pay compensation. Our Honourable Member struggles to find money, and one day this money will all disappear like that. I think this must be taken a bit more seriously. I will tell Brother Arul later. This problem exists. Indeed, that is my speech. In the budget I just read, from 2018 to 2026, the MB is absent. One more time, can I read it? No need, aaa? The MB was absent just now, and the MB is also happy, right? Okay, aaa… the mic is already red, our good friend is close.
Honourable Member, may I ask you for a favour?
Boleh…boleh.
Just now, what I said was all correct. I apologise, I withdraw what I said earlier about the ADUN for Chembong always being late. That was not true.
Okay…okay…boleh…boleh.
Can you withdraw it, please?
Okay…okay….okay…terima kasih.
Withdraw it, lah….
Wait…wait, sit down first, I cannot. Here, my neighbour is indeed a good person. Earlier, when we were in opposition, he was okay, but at that time he, too, got heated. Everything else is okay. He even stood up like this, he and Temiang. But now he is much better, but just now I should have said he is late, but he is not very late, only a little, sometimes, it is fine, that is fine. Say a little, a little sometimes, but about what he said, often when going down to the Pedas area, Chembong has teh tarik, so I withdraw it. Another thing, I support the 2026 budget, a good budget, I say a thousand thanks to the Negeri Sembilan State Government. Thank you… xie xie ni, nanri, vanakam. Okay.
Thank you, Honourable Member for Seremban Jaya. We invite the Honourable Member for Klawang.
Assalamualaikum WBT. In the name of Allah, the Most Gracious, the Most Merciful. Praise be to Allah, Lord of the worlds, and we seek His help. May peace and blessings be upon the most noble of the prophets and messengers, and upon his family and all his companions.
[recites verses 25-28 of Surah Taha]
I seek refuge in Allah from the accursed Satan. "And spend in the cause of Allah, and do not throw yourselves with your own hands into destruction. And do good; indeed, Allah loves those who do good." Allah loves those who do good.
The Messenger of Allah, peace and blessings be upon him, said: "O mankind, spread the greeting of peace, maintain the ties of kinship, feed the hungry, pray at night while people sleep, and you will enter Paradise in peace."
Firstly, congratulations to the Deputy Speaker. Thank you for giving me the opportunity to debate in the Third Meeting of the Budget Session of the Third Term of the 15th Negeri Sembilan State Legislative Assembly (DUN). The Most Honourable Datuk Seri Utama Haji Aminuddin bin Haji Harun, Menteri Besar of Negeri Sembilan. The Honourable Datuk Seri Haji Jalaluddin, Haji Alias, Senior Exco of the Negeri Sembilan State Government. The leadership line-up of the Honourable Members, the Honourable Members of the State Executive Council of Negeri Sembilan, the Honourable Members from both the government and opposition benches, all heads of departments at state and federal levels, ladies and gentlemen, whether present in this esteemed House or following this meeting outside via contemporary mass media.
Datuk Deputy Speaker, on this occasion I extend my congratulations to the Most Honourable Dato' Seri Utama Menteri Besar, of course with the advice and hard work of the team of our new State Financial Officer, Dato' Masri bin Haji Razali, in projecting the state's revenue for 2026 at RM610 million, an increase of RM50 million as mentioned by Seremban Jaya earlier, from last year. This is also the highest so far in our expenditure, and next year our state's budget deficit, in expenditure totalling RM640 million. Let us strive and pray that it will become a budget surplus as has happened in previous years, God willing. Datuk Deputy Speaker, I also congratulate you and wish you success. The state revenue target for 2030 has been set at RM1 billion, a figure which I think can be achieved but requires thorough planning and implementation. I think this is a bold and ambitious target. I hope all parties will strive hard to achieve this target
and its impact will certainly be felt directly and returned to the people of Negeri Sembilan.
Datuk Deputy Speaker, the total allocation for the Negeri Sembilan Islamic Religious Affairs Department in 2026 is RM55.35 million, the highest among the government's departments in Negeri Sembilan. This also reflects how the state government, this unity government, prioritises the progress and development of Islam in this state. I think this contradicts the claims of the opposition outside that during the rule of this unity government Islam has been marginalised. Mr Speaker, moreover, that is not all. Some claim that Islam is under threat in this country. This is baseless propaganda and even slander, and I call on all those involved to stop their efforts to confuse and mislead the people with these sensitive issues. Looking at the focus areas for spirituality and religion, the government has allocated RM7.5 million for new religious and spiritual initiatives, namely upgrading state mosques, syariah legal aid, Al-Quran volumes, additional allowances for imams, Baitullah pilgrimage balloting, and one-off aid, with permission, for female mosque general assistants. Congratulations.
But Datuk Deputy Speaker, from the religious perspective, prevention is better than cure. When it comes to deviant teachings, as involved in Arqam once upon a time, its effects are still present today, for example the DISB case. Therefore I suggest continuous efforts to monitor, prevent and enforce, especially regarding teachers who teach in remote places and not in public or open places. This is my recent experience, Datuk Deputy Speaker. There is an opinion from a well-known preacher and TV programme figure, stating that the iddah of a wife whose husband has died begins when the husband's body enters the grave. It was the first time I heard it; I don't know whether members of this House or people outside have heard it before. The problem, Datuk Deputy Speaker, is that when speaking with villagers, and this figure is indeed famous, they didn't check further and simply practised it. So the wife came out to see how her husband was being prepared, his body was being prepared at the mosque. I think this is perhaps the Tok Mufti's area; we need to look into this situation, and if there is any evidence for it, Allah knows best. This is sometimes why, Dato' Mr Speaker, such matters come out when places of learning are hidden away and not in public places. I want to ask this figure: if the husband's body is delayed by a week, then for that additional week the wife whose husband has died can carry on as usual, can't she?
Datuk Deputy Speaker, as last year, I once again extend my heartfelt thanks to the Irrigation and Drainage Department (JPS) and especially JPS Jelebu, which has helped me greatly in solving problems arising near river channels and silted-up drains, as well as collapsed riverbanks. From the supply bill tabled by the Most Honourable Menteri Besar last Friday, JPS will receive an allocation of RM22.4 million next year. This is an increase of nearly 80% from the current year's allocation. This shows the concern of the Negeri Sembilan State Government regarding infrastructure and the welfare of the people in this country. The efforts to deepen river beds, which I have mentioned in this esteemed House, must continue to prevent certain areas from being affected by flash floods. The Klawang River, for example, Dato' Mr Speaker, although four locations were attempted, unfortunately due to certain constraints only two locations were successfully done, and it has been proven to flood... the situation two weeks ago: at the place where we were able to remove this sand, down to the original depth, no flooding occurred, but at the other two areas, five floods were caused by raised water. I once again emphasise, BAU - Business As Usual, with permission, Datuk Deputy Speaker, this must be reviewed when deepening these rivers by placing that sand on the riverbanks, because when the rain comes the sand will go back into the river and will make the river shallow again.
Datuk Deputy Speaker, in my view these rivers are God's creation, and He is the Designer. If we maintain the original course of these rivers, it means we preserve His creation, hopefully He will not send excessive trials resulting in flash floods in certain places. Dato' Mr Speaker, allow me to touch on road infrastructure including estate roads. Looking at the allocation to the Public Works Department (JKR) of RM46.18 million, the second highest compared with other departments, this also reflects the concern of this unity government for infrastructure development for the people. However, the development of estate road infrastructure must also be given attention, and facilities for these people to transport their crops must be improved. I suggest that a special allocation or other suitable mechanisms be established to address damaged roads, these estate roads that are damaged during the monsoon season, and many of these estate roads in the Jelebu area and especially the Klawang State Constituency have been affected, including by the heavy rain two weeks ago.
Datuk Deputy Speaker, in conjunction with Visit Negeri Sembilan Year 2026. I hope the State Development Department can allocate the cost of building a viewing platform at the Bukit Tajali Recreational Park near the Klawang Jamek Mosque. I have raised this several times, and so far it has not yet been realised, eh. Therefore I ask certain departments to look into this so that the project can be carried out and
visitors to this recreational park can climb up to the viewing platform and view the town of Kuala Klawang as if they were in Cameron Highlands at certain times. This recreational park is hoped to become a focal point for leisure, where people can go hiking, and also become a tourist attraction. Dato' Mr Speaker, I would like to draw attention to the issue of stray dogs. It is an issue that I think never ends. Perhaps in urban areas it can be said to be resolved in terms of procedures, though its performance can still be questioned. But what about the issue of stray dogs in village areas, where when complaints are made to certain parties there is no authority and sometimes no budget. A thorough solution from this perspective also needs the attention of this esteemed House, Datuk Deputy Speaker. The relevant NGOs need to weigh the priority of animal welfare against human welfare. When these abandoned dogs attack people.
Datuk Deputy Speaker, we are about to enter the Visit Negeri Sembilan Year, but the issue of abandoned and stranded vehicles in public places and on the roadside, I also humbly request the attention of this Honourable House. For example, the burnt-out car on the roadside at Pantai Temiang, I think the wreck has been there for more than 2 years, abandoned there with no action taken. The Honourable Member for Lenggeng also surely sees that, doesn't he. So I hope effective actions will be taken whenever this situation is seen anywhere.
Datuk Deputy Speaker, another issue I found, which is quite unreasonable but it did happen. The design of PPRT houses, where I found, perhaps this is an isolated case or not, I don't know, but in the case I found, the grey water and sewage enter the same septic tank. It is full, Mr Speaker, and has to be pumped out every six months. Whereas if this is a design problem or an implementation problem, I think it needs a thorough solution. Datuk Deputy Speaker, on this occasion I would like to touch on the RRE mining plan in Jelebu, which must be implemented with great care so that it does not bring negative impacts to all parties, especially the people of Jelebu. I would like to ask what benefits the people of Jelebu will generally obtain? How many job opportunities will be created by this mining? So far, no party, I have not been given any detailed explanation of exactly what we will be implementing there. The people outside are asking with anxiety because of previous cases, and they need an answer from the government. Dato' Mr Speaker, as a closing, I once again extend my congratulations to all who have worked tirelessly to organise and plan this budget. God willing, we will be able to implement it together with the earnest efforts of all of us.
That is all. With Allah's guidance and blessings. Assalamualaikum warahmatullahi ta'ala wa barakatuh.
Thank you, the Honourable Member for Klawang. Next, let us invite the Honourable Member for Sungai Lui to continue the debate.
Bismillahirrahmanirrahim, Assalamualaikum WBT Honourable Datuk Deputy Speaker, thank you for giving me the opportunity to take part in the debate on the Negeri Sembilan Budget 2026, themed Belanjawan Madani Rakyat Harmoni. First of all, allow me to record my appreciation to the Most Honourable Menteri Besar for tabling a Budget that is progressive, practical and also grounded in the people. The 2026 Budget focuses on strengthening the economy, the welfare of the people and the sustainability of state development. This Budget focuses on 9 focus areas and 69 people-centred initiatives. 23 new initiatives have been introduced and 46 existing initiatives have been retained.
I am encouraged by the agenda to strengthen enforcement teams to combat any form of encroachment on state land and existing natural resources. State revenue can be increased without raising taxes, but by increasing compliance and also strengthening efficient enforcement among enforcement agencies. Honourable Member, Datuk Deputy Speaker. DUN Sungai Lui has 8 Felda settlements, 4 Orang Asli villages, 2 Chinese new villages and also 3 traditional villages in DUN Sungai Lui. Matters relating to infrastructure are often the main topic of conversation among the people. These areas still have drainage problems and road problems that require continuous solutions from the state government as well as associations. Other public facilities such as Balai Raya, Dewan, Sports Grounds, as well as tabika schools, secondary schools and also primary schools, and street lights also need attention. The addition of street lights in every village and also in certain locations helps reduce the risk of road accidents and also minor criminal activities. Street lights are not only a matter of safety but also a basic facility that contributes to quality of life, which can give residents the opportunity to hold community night activities without fear. Our highest appreciation to the state government and the relevant offices for approving the work to replace old pipes at Kampung Asli Sungai Sampo and also Feda Lui Selatan 1 and 2. In Kampung Sungai Sampo, the work is being carried out by SAINS (Negeri Sembilan Water Company), while in Lui Selatan 1 and 2 it is at the consultant surveyor stage by PAAB - Water Asset Corporation Berhad.
This approval is not merely a small project but is a sign of the government's concern for the lifeblood of rural people, which I have previously brought to this House. For many years, residents in this area have faced water supply problems that are frequently disrupted due to old pipes that leak and are also damaged. Now, with this approval, the community in the area can breathe a sigh of relief because they will enjoy a more stable and also safer water supply. Indeed, this is proof that the voice of the people of DUN Sungai Lui has been heard and that rural areas are not being marginalised. I hope this success will become the beginning of more infrastructure projects that are needed in Sungai Lui so that the well-being of the people is continuously assured. In this Budget too, the lighting programme for villages and also Orang Asli villages is stated, which is very important in supporting the inclusive development agenda.
The organisation of KORAN 2026, the Negeri Sembilan Orang Asli Carnival, is not merely a cultural event but a strategic platform to empower the Orang Asli community through the economy, social affairs and also culture. This carnival opens opportunities for the Orang Asli community to market all the products produced by them, in addition to strengthening relations with the general public, reducing social gaps and also enhancing understanding. This carnival is not only an entertainment event but a symbol of the state government's commitment and also a centre that brings comprehensive impact: the economy grows, society is bonded, culture is preserved, and Orang Asli community development is strengthened. The Orang Asli community must continue to be given opportunities and also opportunities within the mainstream of state development.
Datuk Deputy Speaker, a home is the foundation of the people's well-being. Without a comfortable home and also affordable housing, the people will continue to struggle with high living costs. The new generation of Felda in DUN Sungai Lui faces difficulties in owning their own homes. Many children of settlers still live with their parents and also rent in nearby areas. House prices in the market are too high and a housing scheme specifically for the new generation of Felda still has not shown a solution. The proposal to introduce pocket land within Felda in DUN Sungai Lui is a strategic step to ensure the new generation is not marginalised. Felda also, land administration as well as district land administration, and also land should take initial and also swift steps. So, the proposal for this effort can actually be realised so that the economic settlement of the community, the new generation, will remain more rooted in their home villages, build a brighter future and become a successor to the earlier settlers. For information, in most Felda areas there are settlements that were built earlier, business areas and so on, and we humbly request that the settlement areas that were built, which at one time were the shop-lot areas and also these built settlements, be whitened so that they can own their own homes.
In the meantime, plans to increase the number of low-cost public housing need to be refined and made a main agenda in future Budget tabling sessions. Honourable Datuk Deputy Speaker, issues of welfare and also the cost of living cannot be avoided, especially in rural areas such as DUN Sungai Lui. I express my thousands of thanks to the State Government for maintaining the Senior Citizens Incentive scheme. Senior Citizens' Assistance (BWE), which has been implemented by the state government in particular, is important in helping the elderly, especially in rural areas. School Children Assistance (BAS) and State Children Scholarship (BAN) also bring many benefits to the community, but the method of listing recipients often becomes a topic of conversation among parents. It is hoped that the listing of recipients can be improved and clarified to the District Education Office administration so that it does not become a controversy among the community.
Honourable Dato' Mr Speaker, food security is no longer a small policy issue and it has become a factor of security and also well-being for the people. Sungai Lui, as a DUN with a combination of Felda areas, traditional villages, and agricultural land, is in a strategic position to become a contributor to the food chain for Negeri Sembilan. We need to change the perception that agriculture is a second-class job. The time has come for Felda to be given a new mandate as an agro-food hub that encompasses agro-technology livestock and also basic food processing. However, nearly half of farmers are aged 60 and above, whereas only 22% of young people are in the agricultural sector. We are facing the risk of a generational crisis in the food sector and also studies show that young people do not reject agriculture but they reject a system that does not support them, such as no land, capital, expensive technology and also a career status that is looked down upon. We need to break negative perceptions of agricultural work and raise the career status of young farmers so that this sector is seen as on par with other professional careers.
Datuk Deputy Speaker, on this occasion I also wish to express my thousands of thanks and highest appreciation to the State Government for resolving the application for ownership of Lot Dusun land for 37 first-generation Felcra Air Hitam participants, who had waited for 60 years to find a solution. Most of them are heirs who live there, and indeed they are all grateful for what the Government has done to resolve this. I hope this grant of land can be utilised for land use for the good and also the development of their families.
I take this opportunity to express my thousands of thanks to the Jempol Land and District Office and all parties of the State Executive Council (MMK) who have agreed to and approved the applications of these settlers. Honourable Dato' Mr Speaker, I also wish to express my thousands of thanks for the State Government's commitment to resolving the GETCO land problem as quickly as possible. I fully support the solution measures that have been taken by the Government and hope that it can be finalised soon.
In the composition of the same area and also nearby, the Government through Felda needs to take decisive action, namely the slippery road at the Serting palm oil mill road and also the Pasoh palm oil mill, which is not a small matter that can be taken lightly. This situation can not only cause the risk of accidents to road users but also affect the opportunities of mill workers, local residents and also visitors. Vehicles easily skid, especially during rain, and the mill management must be held accountable because their operations contribute to slippery road conditions due to oil spillage or oil residue on the road. Immediate action by the mill management through periodic maintenance and the installation of road-cleaning systems, or by the Government through stricter Enforcement of Laws, to guarantee the safety of the people and also the smooth running of the state's economy.
Datuk Deputy Speaker, as a summary of my debate, allow me to stress that the Negeri Sembilan Budget 2026 amounting to RM640 million, with the theme Belanjawan Madani Rakyat Harmoni, is a document that reflects the State Government's commitment to developing the people comprehensively. However, in the spirit of social justice I wish to emphasise that development must truly reach the lifeblood of rural people, especially also in DUN Sungai Lui. The issues raised are all real challenges faced by the community. Without serious attention, the development gap between urban and rural areas will continue to widen. This Budget must become a vehicle for real change with the support of the state government and also I am confident that the people will enjoy a better life and the state will truly become a harmonious madani state.
In conclusion, DUN Sungai Lui humbly requests support for the budget motion that has been tabled. Thank you.
Thank you, Honourable Sungai Lui. I now invite the Honourable Gemas to continue the debate.
Assalamualaikum WBT. Thank you, Datuk Deputy Speaker. Thank you for allowing me to take part in the debate on the 2026 Budget. My respected senior, the Honourable ADUN for Sikamat, the Exco members, government officers, the ADUN members, and the Negeri Sembilan State Assembly. Firstly, congratulations on the increase in Negeri Sembilan's estimated revenue from RM590 million last year to RM610 million in 2026. The state's revenue has increased by RM20 million, but it is still far from the target of RM1 billion set for 2030. However, behind these seemingly positive figures, a question arises when I read through this book, the Budget Estimates book for non-tax revenue for 2026, which totals RM64,757 million, but the figure announced is only RM60 million. There is a difference of nearly RM4.75 million. This is an audited document, and the figures should be written clearly, accurately and sincerely. This difference, this difference, cannot be taken lightly because it creates room for misunderstanding and raises questions about the carefulness in preparing this non-tax revenue.
Secondly, when we refer to the 2026 state development expenditure estimates, we are informed that the estimated state revenue for 2026 is RM610 million, but operating expenditure is estimated at RM640 million. This means we have already started next year with a deficit of RM30 million. More disappointing is that this operating expenditure has increased by nearly RM50 million compared with the previous year, but this increase has not flowed to the sectors that truly benefit the people, especially rural communities and low-income groups. I am quoting this, and first I want to question the 2026 development allocation compared with 2025, where the allocation for the Menteri Besar's Office increased drastically from RM45 million to RM56 million, an increase of RM11 million, which is nearly 24.44%. This allocation covers social development, assistance programmes and community activities as written in this book. Why is such a large allocation concentrated under just one office, while at the same time allocations for important sectors such as agriculture, irrigation and drainage, and tourism have been cut? Such an increase raises the question of whether the government truly focuses on the people or concentrates on strengthening the image of administration through programmes centralised at the Menteri Besar's Office. Where the agriculture department received RM11 million last year. The agriculture sector should be the backbone of the state's strength, considering that it is an important source of income and involves many people in rural areas. Smallholders, livestock farmers, paddy farmers and planters. However, the agriculture sector allocation has been cut from RM11 million to RM7.25 million, a reduction of 30.91% next year. How can we strengthen the food chain, increase agricultural output, and help farming families and farmers if allocations keep being reduced? In a situation where the prices of goods keep rising, agricultural input costs and price increases, all these reductions are unreasonable. Next, the Drainage and Irrigation Department (JPS), while the people face damage, I take the main speech of the Honourable Member at the beginning when presenting the state of the country as very peaceful even though foreign countries were hit by floods, but damage to property caused by flash floods in the area has often been the focus of the people. How is the irrigation and drainage allocation cut from RM10.65 million to RM6.89 million, a reduction of 35.3%. The government wants to reduce the risk of flooding, but if the original allocation for drainage is also reduced, the people face floods every year yet the allocation keeps shrinking for next year.
Fourthly, the tourism sector. The year 2026, as we all know, has been declared the Visit Negeri Sembilan Year. However, the tourism allocation has been cut from RM6.2 million to only RM2.5 million, nearly a 60% reduction. In the remaining part of the budget, to implement promotional programmes to enhance the state's image, everything requires sufficient funds. The RM6.2 million budget for 2025 also did not show what was being portrayed, let alone when the budget is reduced to RM2.5 million. The housing sector, the people's housing sector, which is allocated RM3 million. In the people's housing sector, the whole of Negeri Sembilan is expected to receive RM3 million for improvement works. At the same time, for alteration works on the Menteri Besar's Official Residence, Guest House and Rest House, the government has allocated RM0.9 million. Compare this with the people receiving only RM3 million, while those mentioned above received RM0.9 million. This shows an unreasonable imbalance and gives the impression that the government's priorities are rather misplaced. If we examine the whole of this budget, many allocations have increased but are concentrated on the management division of the Menteri Besar's Office and upgrading the state government's computer system, not on sectors that help people such as agriculture, irrigation and drainage, tourism and housing. So what exactly are we to tell the people about the 2026 budget? The government must remember that a budget is not merely numbers, as said by ADUN Pertang, it is a reflection of priorities. Today we debate together in the interest of the people of Negeri Sembilan, let us not present this three-month bonus as... We are grateful for what the Honourable Member presented the other day, but our request is also that you consider the central staff who are on duty. Last year, staff working in Negeri Sembilan who worked at the centre were given RM200.
Next, I would like to touch on issues in the Gemas State Constituency. I have submitted a letter, if we follow the reports submitted to SISPAA, it has happened many times. I have also seen oral questions from government ADUNs asking about the function of SISPAA, and I also wrote a complaint letter directly to the Menteri Besar's Office in the 8th month to raise several issues. I am not questioning why it is late, but please listen to the matters that have happened in the Gemas State Constituency that, up to now, have almost not been resolved.
The first issue is the Gemas Railway Museum, which has been renamed the Gemas Railway Gallery. For the information of the House, Gemas wishes to bring to the attention of the House a project that is not only important for the history and identity of Gemas. Gemas is not merely an ordinary town but is a junction which, as mentioned by Chennah earlier, when the ETS train from KL Sentral to Johor Bahru will stop at Gemas to change, an interchange for those heading to the east coast. Today we have a Gemas Railway Museum Project area that has been included in the Gemas Special Area Plan (RKK) in three phases. Phase 1 - 2019 to 2023, Phase 2 - 2023 to 2027, Phase 3 - 2027 to 2030. Referring to the statement given by the Honourable Menteri Besar during the previous session in 2022 as Exco answering questions from the former ADUN, MOTAC handed over RM490,000 to the Gemas Small District Office in 2021 for the purpose of implementing upgrading works on the old Gemas railway station to be turned into a museum. The works continued in 2021. Subsequently, the planning was handed over to action by the Tampin District Council. Last year, in the same budget, I asked this question and I still remember that on 3 December, two or... two Exco members and an ADUN came to Gemas to look at the complaint. Where, without realising it, this museum within this year has turned into the Gemas Gallery. However, phase one has already been completed, but no exhibits have been prepared. More worrying is that suddenly this project was renamed the old railway gallery on the grounds of...
YB, please land, YB, the time is up.
Next, Deputy Speaker, I will bring up two or three more short issues. I will take only two minutes, I understand. The issue of illegal rubbish dumping, which I have stated and referred to in the SISPAA system for a long time. This issue has occurred on the land of the Gemas Recreational Park Land Office. Only the district office has put up a rope to ensure this area is not trespassed upon. But the photos we took recently still show that illegal dumping is still being carried out at the Gemas Recreational Land.
Next, the issue involving a contractor placing construction materials that have been there for a long time at the Pasir Besar junction. Where at this traffic light junction there are construction materials from a contractor. If ordinary people or those who trade by the roadside, action is taken quickly, but for this contractor, if Mr Speaker comes to the Gemas junction heading to Palong, you will see for yourself the piles of rubbish or construction materials placed in front of the BHP petrol station.
Next, the issue of the Drainage and Irrigation Department. The issue of damage to the paddy field road at Kampung Londah due to the use of heavy machinery for drainage maintenance works. Thankfully one drainage issue has been resolved, but the contractor did the work using heavy machinery and the road used has actually been damaged. This area is often used as a visiting spot for local tourists to see the paddy fields, but if described today, this road has been left with potholes, and recently in a running race, it had to be covered with crusher run only. But it should not be left like that. I hope the JPS and the Gemas Land and District Office will take appropriate action. Next, the work of the Public Works Department. Complaints have been made for so long, namely the traffic light junction at Pasir Besar and Gemas Town. For two years, the warning signboards prepared by the maintenance party have been there. Every time in the House I bring up this issue, surely a road in such condition should not simply be left with only warning signs saying road damaged for these two years. I will conclude with the last issue, that I humbly seek the assistance of Dato' Jalal as Exco, as Senior Exco last year, in the same session I raised the issue of flooding at Taman PGBF Felda Pasir Besar, Dato'. Until today, during Dato's reply, Dato said that Felda would appoint a consultant. Up to today, Dato', just for Dato's information, up to today there has been no action from Felda, and the residents of the area are still wondering whether this reply is in line with Felda's action. I do not blame Dato', but I humbly ask that this situation be conveyed to Felda. Finally, I apologise, Dato' Speaker, Deputy Speaker, the water issue in Gemas is the same as in Sungai Lui, Gemas. I want to draw attention to one situation in Pasir Besar. In this one year, there have been 23 reports of burst pipes in this area, and up to today what often happens, I do not know why this issue has dragged on for quite some time. Perhaps we need to think together about how this is not only affecting Gemas.
Okay YB, please land immediately, YB.
I land, Dato' Speaker, Datuk Deputy Speaker, so I hope that in this short time I can voice the issues at the Gemas level and at the budget level just now. With this, I apologise if any of my words earlier were offensive. I apologise, and I support this budget. Thank you.
Thank you, the Honourable Member for Gemas. We invite the Honourable Member for Seri Tanjung to continue the debate.
Honourable Datuk Deputy Speaker, I offer my congratulations. I wish to record my highest appreciation and thanks to the Honourable Datuk Deputy Speaker for giving me the opportunity to take part in the debate in this honourable House. The sittings of this House are not merely a platform for us to discuss the policies and direction of national or state development, but more importantly, they are a responsibility for us to voice the pulse, the cries, the hopes and the aspirations of the people who have given us their mandate and trust. I also wish to take this opportunity to extend my highest congratulations to the Most Honourable Menteri Besar of Negeri Sembilan for his continued commitment in administering the state on principled grounds and on the core values of being clean, consensual and prosperous. I wish to extend my highest congratulations and appreciation to the Negeri Sembilan State Government for its remarkable excellence in that Negeri Sembilan has been recognised as the most progressive state in Malaysia for 2024, through The International Business Review Asian Award 2025. This recognition proves the strategic policies implemented through the Negeri Sembilan 2045 structure plan and the Malaysian Vision Valley 2.0, which target long-term development, quality investment and sustainable economic growth of the state. I also record my highest appreciation and thanks to the Most Honourable Prime Minister, Dato' Seri Anwar Ibrahim, for the various bold and pro-people incentives, and through the implementation of the flagship semiconductor high value high technology industry project, with the target of increasing the export value of E&E products to approach RM1 trillion by 2030. With the strengthening of these policies under the framework of the 13th Malaysia Plan (RMK-13), I am confident that Malaysia will continue on a resilient, inclusive and sustainable economic path. While ensuring that the Negeri Sembilan agenda as a progressive state can continue to be sustained along with the current of national development.
Honourable Datuk Deputy Speaker, allow me to begin the debate on the Negeri Sembilan 2026 Budget with a short pantun as an opening remark:
Going to the orchard to look for ginger, Choosing the most fragrant of the ginger, The Madani Budget as our champion, For the sake of harmonious Negeri Sembilan people.
Firstly, I wish to record my appreciation to the Most Honourable Menteri Besar of Negeri Sembilan, Dato' Seri Utama Aminuddin Harun, for tabling the Budget themed Belanjawan Madani Rakyat Harmoni. This Budget details a total of 69 initiatives, including 23 new initiatives and 40 existing initiatives that have been improved. From 2019 to 2025, a total of 214 initiatives have been successfully implemented. This achievement is more meaningful when Negeri Sembilan recorded a surplus for four consecutive years, from 2022 to 2025, thereby proving that the Negeri Sembilan State Government practises prudent and disciplined fiscal management. The Negeri Sembilan 2026 Budget was tabled in a frugal manner with estimated revenue of RM610 million. The estimated operating expenditure is RM640 million and also includes an estimated development expenditure of RM150 million. I also welcome the continuation of the Sejatera Rakyat Scheme (SSR) with an allocation of RM29.75 million, which benefits the people from infants to the elderly. The success of this scheme would not be achieved without the commitment of all the unity government's state assemblypersons (adun) who are always going down to the grassroots to ensure that assistance reaches eligible recipients.
Honourable Datuk Deputy Speaker, I would like to draw the attention of the House to the issue of the Negeri Sembilan Affordable Home (RMMNS). Although the price of the houses offered is reasonable, many people are unable to own a home because bank loans are not approved. Self-employed persons, small traders and individuals who do not have payslips or a strong financial record often fail at the initial loan stage even though they are in fact able to pay. Therefore, I propose that the state government consider implementing a hire-purchase scheme to help these groups own their first home. Such a scheme not only opens the way to home ownership for those marginalised from the bank loan system, but also supports the state's agenda in enhancing the well-being of the people. I also wish to record my appreciation to the state government for the opportunity for me to attend an international forum in Athens, Greece, which discussed the importance of artificial intelligence (AI) in modern democratic systems. Among the important points emphasised at the forum was how fake news and false information can trigger public unrest, riots and undermine the economic stability of a country.
Young people today are highly exposed to unfiltered digital information. Therefore, I propose that aspects of digital literacy, digital civic education, resistance to fake news, and the ethics of technology and AI development be included as additional modules in school co-curriculum. Early education is key to producing a generation that is knowledgeable, fact-based and not easily influenced by untrue sentiments.
Honourable Datuk Deputy Speaker, allow me to bring the attention of the House to several issues of educational infrastructure and public amenities in Seri Tanjung. The condition of the hall of SDASA school is now unsafe for use because part of its structure has collapsed and requires immediate action. Ribut Senyar has also caused serious damage to Sekolah Tinggi Port Dickson (STPD), particularly to the roof structure of the building and the school's sewage treatment system. Kolej Vokasional Port Dickson, meanwhile, faces problems of dilapidated hostels and facilities, and requires urgent repair. I request that the State Government consider using allocations under the school maintenance trust fund to expedite these repair works for the safety and comfort of the students. Ribut Senyar also caused severe damage to the Port Dickson passenger jetty, to the extent that ferries cannot dock. This situation has a major impact on the operations of the tourism gateway and affects the income of taxi drivers and local traders. I request that the repair of this jetty be given priority because it involves the economic interests of the district as well as the image of the state as a major tourist destination. Ribut Senyar also caused infrastructure damage at one of the churches in Port Dickson. Here I wish to express my thanks to the Most Honourable Menteri Besar of Negeri Sembilan, who is also the Member of Parliament for Port Dickson, for his assistance in the restoration before the Christmas celebrations. I also express my thanks to the local authorities (PBT) and the land office for their tireless efforts in checking documents and resolving problems of the repair of homes affected by the storm.
Honourable Datuk Deputy Speaker, in preparation for the Visit Negeri Sembilan Year 2026, I record my highest appreciation to the Port Dickson Municipal Council (MPPD) for its various initiatives to brighten the Port Dickson district, including the installation of decorative lights, murals, landscape lighting and aesthetic elements that beautify areas frequented by tourists. This effort deserves praise because it has succeeded in creating a more lively atmosphere and attracting the interest of visitors. However, I request the cooperation and support of the Tourism and Culture Exco to help the local authorities, particularly MPPD, improve the decorative lighting aspect, especially ahead of major festivals. The decorative lamps are still insufficient to provide a more vibrant visual impact and to match the image of Port Dickson as a national tourist destination. Therefore, I propose that the installation of decorative lamps be enhanced with a greater number of lamps on each pole to celebrate cultural diversity and attract tourism through brighter, more creative and large-scale lighting.
Finally, I thank the Dato' State Secretary of Negeri Sembilan and the Negeri Sembilan Public Library Corporation for approving the Seri Tanjung proposal, namely the establishment of a community library at the Seri Bandar flats in Seri Tanjung. Datuk Deputy Speaker, this community library is the first community library in Negeri Sembilan. I hope that this community library model can be expanded to other flat areas around Negeri Sembilan so that more children gain access to educational materials and learning resources.
Honourable Datuk Deputy Speaker, the Negeri Sembilan 2026 Budget is an inclusive, realistic budget grounded in the welfare of the people. It reflects the sincerity of the unity government in ensuring that state development takes place in a balanced and sustainable manner. With a sense of responsibility, I state my firm support for the Negeri Sembilan 2026 Budget and hope that all the proposals and the needs of the people that I have raised will receive due attention.
Datuk Deputy Speaker, honourable Members of this House. Allow me to open this closing debate with a literary work in the Tamil language. Permission, yeah? [Tamil literature] This Thirukkural emphasises that a great ruler or government is not merely one that collects revenue, but one that is wise in managing, protecting and ultimately redistributing it back to the people with full justice. In line with the vision of the Negeri Sembilan State Government, a government that is excellent, or said to be excellent or great, is not one that stops at mere income figures. A government that is truly outstanding is one that is wise in generating income, managing finances transparently and frugally, protecting the state's assets and revenue, and ultimately channelling those benefits back to the people fairly and equitably. This is the characteristic of administration that forms the pillar of the Negeri Sembilan State Government, ensuring that every ringgit is managed to improve the quality of life of the people, strengthen the state's economy, and ensure that no community is left behind. That is all. Thank you.
Adjournment of MeetingAdjournment
Thank you, the Honourable Member for Seri Tanjung. Alhamdulillah, honourable Members all, shortly I will adjourn the sitting of the House. The debate on this Bill and Motion will resume on Tuesday, 9 December 2025. Let us close with subhanakallahumma, wabihamdika ashhaduallaailahailla anta astaghfiruka waatubuilaik. The House is adjourned.
[The House was adjourned at 4.23 p.m.]