Pulau Pinang · 2 September 2021

14th Assembly, 4th session, 1st meeting · 510 turns · 58,493 words · official PDF ↗

434 of 510 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

(Opening)

Secretary of the HouseEN

Honourable Members, the Honourable Speaker of the State Legislative Assembly. Recitation of Prayer. Oral Questions.

Speaker (Speaker)EN

Honourable Members, we are now in the oral question session. I invite the Honourable Member for Batu Lancang.

Ong Ah TeongDAP · PHBatu LancangEN

Mr Speaker. My question is Question No. 2. No. 2. It is understood that the physical works for the Sungai Pinang Flood Mitigation Project (RTB) will commence in January next year and will include the construction of a new Jelutong diversion, which will help reduce the burden on the existing diversion. (a) What is the estimated date for the commencement of construction of this new diversion project? I hope this construction can be given priority.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Yang di-Pertua, and thank you to the Honourable Member for Batu Lancang for his question. Honourable Member, the Sungai Pinang Flood Mitigation Project, or RTB, will give priority to the flood hotspot locations along Sungai Pinang, namely from the Jalan Patani bridge to the Jalan Datok Keramat or Air Hitam bridge. For the information of the House, the new Jelutong diversion is still under final consideration by the technical committee, based on factors such as suitability of the local area and future developments along the alignment. Only after obtaining approval and finalisation from the technical committee will the Drainage and Irrigation Department (JPS) Malaysia proceed with procurement for the construction of the project. So the estimated timeline may be by the end of this year or early next year. But, as you know, at this time many projects are experiencing delays due to the Movement Control Order (PKP). Nevertheless, this design is being worked on regardless and will be finalised in due course. However, the JPS Penang State Office is currently preparing the final design for two (2) critical locations in Jelutong, namely Jalan Van Praagh and Kampung Pokok Asam, which are expected to commence construction at the end of the year, if possible as quickly as we can, yes, this year. These two small-scale flood mitigation projects are medium-term interim solutions while the completion of the RTB Sungai Pinang is carried out. So I hope that answers the question, thank you.

Speaker (Speaker)EN

Thank you. Next, I would like to invite Pulau Tikus. Is there? No. Please.

Ong Ah TeongDAP · PHBatu LancangEN

For my question. I would like to ask the YB EXCO. Is there any other alternative to the problem of the solution for where the diversion will be built? I understand it will be built at Jalan Ahmad Nor. Because a better alternative is needed, since the area there is really busy with the LRT and the expressway there.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member, for the supplementary question. What the Honourable Member has just said is true. Indeed, construction in the Jalan Ahmad Nor area, which is the alignment proposed for the new Jelutong diversion, is an area that already has rapid development, and traffic and so on will all be problems, but that is actually one of the factors that is also being considered by the technical committee. Nevertheless, in the conceptual design proposed by the consultant, there is also a proposal to construct parallel drains on the left and right of Sungai Pinang, starting from downstream of Sungai Air Hitam to the bridge at Jalan Patani. These parallel drains will actually serve as discharge outlets for the drains in the area, so that water from all the drains does not enter the river. So it will have two (2) functions: first, to help with flooding and so on by reducing the capacity in the river, but second, in terms of river pollution. All of us here are well aware, especially the Honourable Member for Sungai Pinang, who often raises pollution in Sungai Pinang, and if we have parallel drains that intercept water from the drains and prevent it from entering the river, then we can also achieve the goal of reducing pollution in that river. So this is one of the alternatives that is also being studied. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. I invite Pulau Tikus.

Lee Chun KitDAP · PHPulau TikusEN

Mr Speaker. My question is Question No. 3. No. 3, the Gurney Wharf Project. (a) What is the latest development of the Gurney Wharf project, and when is the project expected to commence and be completed? (b) Is the State Government prepared to expedite the project?

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Honourable Member Dato' Speaker, and to my colleague from Pulau Tikus, as the question concerns the current status of the Gurney Wharf project. Dato' Speaker, for the information of all in the House, we are indeed intending to make Gurney Wharf an international-standard recreational area. In the meantime, at this stage, after a long time, I think most of the reclamation has been completed, we are at the stage of appointing consultants, where so far seven (7) consultants have been appointed with expertise in their respective fields, namely number one, the architect who is also the project manager, the Local Landscape Architect working together with an International Landscape Architect, Civil and Structural Engineers, Mechanical and Electrical Engineers, Quantity Surveyors, Marine Engineers for the coastal and reclamation components of the project, and Environmental Consultants.

The consultant agreement, Dato' Speaker, was signed by the State Government's representative on 21 December last year, so we have done that. Project implementation is expected to commence in the fourth quarter of this year, which is by the end of this year we hope, and the time required for the implementation of the whole project is three (3) years. We have also stipulated an additional one (1) year if there are defects, the liability period, that is until the fourth quarter of 2024. The whole project will be fully financed by the State Government, with an estimated cost totalling RM200.3 million. This was indeed mentioned by His Excellency the Governor himself in his speech, where I think he was really interested in this programme. Now, when I state that the whole project has several phases, namely Phase 1, which consists of the provision of a children's playground, a Skate Park area, a viewing deck... (with permission), public toilets, a promenade for pedestrians, hawker kiosks, a retail area, a convenience store, a surau, a refuse centre, landscape areas and recreational park, multi-storey and open car parks. Now, we expect this first phase to be completed, Dato' Speaker, in the fourth quarter of next year. So the first phase is really the green area, the public parks. This comprises what I have just stated, with your permission. We hope that by the end of next year Penangites will be able to enjoy the facilities there. Phase 2, Dato' Speaker, consists of the provision of part of the landscape areas and recreational park. We have also discussed adding more hawker kiosks, toilets and car parks, as well as the drainage and stormwater system, which we also expect to complete for Phase 2 in the following year, the fourth quarter, also 2023. So, in all, we hope that by 2023 we can get things up and running. Now, Dato' Speaker, as a follow-up, the next step is that the consultants have referred to all the relevant technical departments and agencies for the purpose of preparing the development plan and project approval. The application for Planning Permission (KM) and Building Plan was actually submitted on 11 May 2021 and 15 July 2021 respectively to PlanMalaysia, and in principle, Dato' Speaker, the Planning Permission Plan has been approved with some minor amendments on 12 July this year. The landscape approval was also submitted for consideration in July as well, on 2 July, and is still under consideration by the relevant department. The latest, Dato' Speaker, is that I have been informed that the Public Works Department (JKR) has been appointed as the Superintendent Officer on 6 August recently and as the technical advisor, since this project is a social project with full financing from the State Government. As for the consultants I mentioned earlier, seven (7) have been appointed, and they are now in the process of preparing tender documents to be finalised, and the tender will be opened for contractors to enter. We are doing everything as per our CAT, that is happening, and we hope the invitation to tender can be made early this September. Now, Dato' Speaker, we are indeed committed to the implementation of this project for the benefit of the people of Penang, and we have made it mandatory for all technical departments and agencies to give priority to processing applications related to this project and to comply with the timeframes that have been set. So, I have given the timeline, I think Pulau Tikus asked whether it can be expedited. Indeed, if there are any approval processes that can be expedited, provided all conditions are complied with, since this is a State Government project, we can see how we can expedite it. We really want this project up and running. In fact, Dato' Speaker, it was supposed to be last year, but because of COVID-19 everything was delayed, Dato' Speaker. Thank you.

Speaker (Speaker)

Terima kasih.

Lee Chun KitDAP · PHPulau TikusEN

Dato' Yang di-Pertua, I would like to ask a supplementary question. This is because it is also related to the Gurney Wharf Project. What is the current status of the STP 2 project? What is the current status of its construction? I would like to ask, what is the status? Does the State Government have a timeline or anything? Thank you.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

I will inform you of the details, it's a totally different place, Gurney Wharf and STP 2 are totally different. STP 2 does have Phases 2B and 2C, which are new islands. 2A has been completed, namely Straits Quay, so the new island 2B is being completed and we will proceed with 2C. There is a timeline, but I will give that to ours, this question is actually on Gurney Wharf. Thank you, Yang di-Pertua of the State Legislative Assembly.

Speaker (Speaker)EN

Yes, Honourable Member for Kebun Bunga, please.

Jason Ong Khan LeePKR · PHKebun BungaEN

Thank you, Yang di-Pertua of the State Legislative Assembly. My question is No. 4. No. 4. What are the State Government's new plans and methods to overcome all the maintenance problems that have arisen at the People's Housing Project (PPR) Padang Tembak? (a) Will PPR Padang Tembak be rebuilt? (b) Can PPR Padang Tembak be relocated to another site?

Terima kasih Yang di-Pertua Dewan Undangan Negeri atas soalan daripada Ahli Kebun Bunga yang adalah berkenaan Projek Perumahan Rakyat PPR di Padang Tembak iaitu di kawasan beliau iaitu sama ada kita akan buat pembinaan semula or regeneration as this is known dan apa proses berkenaan berlaku pemindahan lokasi yang lain. Dato’ Speaker, untuk makluman semua di Dewan sejak tahun 2008 sehingga Ogos tahun ini kita telah dalam pelbagai Tabung Penyelenggaraan yang kita ada iaitu satu untuk perumahan awam yang kedua adalah untuk perumahan swasta yang layak iaitu Tabung Maksima 80:20 semua orang tahu, dan juga yang ketiga kita ada satu tabung untuk bantu perumahan awam oleh kedua-dua PBT kita, Majlis Bandaraya Pulau Pinang dan Majlis Bandaraya Seberang Perai. Secara keseluruhan setakat ini Dato’ Speaker, dalam kesemua tabung ini kita telah belanja RM281.77 juta untuk kerja-kerja penyelenggaraan di semua Skim Perumahan untuk Padang Tembak saja daripada ini kita telah belanja RM51.91 juta untuk tujuan penyelenggaraan which I think is one of the most substantial sum kerana ini projek memang kita sudah tahu lebih kurang 50 tahun dan perlu banyak penyelenggaraan. Antara lain skop penyelenggaraan adalah seperti berikut Dato’ Yang di-Pertua, the main one of course everyone knows about two (2) years ago kita buat penambahbaikan keretakan bangunan iaitu di dua (2) Blok A dan J yang mana kita dinasihati untuk buat, itu telah dibuat kita ada secara berkala kontrak pembersihan that is in all housing scheme and then pembaikan secara am kawasan gunasama. That means common area dan harta gunasama and of course secara

berkala also because there 9 blok there kita ada banyak lif hampir 27 yang perlu diselenggara secara berkala, that’s also takes up a lot of expenses from of the tabung, Dato’ Yang di-Pertua. Now coming back to the pembaharuan semula suggestion, di Pulau Pinang memang kita ada satu Jawatankuasa Pembaharuan semula Urban Regeneration Committee yang sekarang di bawah satu unit khas di bawah Lembaga Perumahan Negeri Pulau Pinang yang telah ditubuhkan dan telah mula beroperasi mulai Januari tahun ini dan kita ada lima (5) projek yang telah dikenal pasti dan tiga (3) di bahagian Pulau dan dua (2) di bahagian Seberang. Dan kita bertekad untuk mula tahun ini in fact there is in Mahsuri in Bayan Lepas and we hope by the end of the year it will start because the issues we are more or less perhalusi and we will go to that. Padang Tembak is one of the other yang sudahpun kita ada satu plan secara prinsip dan kita perlulah seperti mana saya nyatakan lihat kepada aspek perundangan dan hakmilik dan sebagainya. Di Padang Tembak kita ada 3,300 unit around that so you can imagine the stale of it compared to the first one that we want to do that’s why I started out by saying the truth there is perceptive. Mahsuri only there is around 300 so that one is okay. Mahsuri the best part is there is tapak yang kosong di mana pelan kita adalah untuk bina di tapak yang kosong dulu dan serentak kita akan lihat bagaimana nak pindah. Padang Tembak the perceptive is different you cannot do that unless we find tapak yang kosong so that we can do that slowly then we relocated. So at the moment we are looking to that aspect that is the most importance aspect we use Mahsuri as the benchmark so memang kalau kita lihat pada Padang Tembak dan betapa banyak yang kita telah belanja option pembaharuan semula, Dato’ Speaker, sememangnya yang terbaik, I appreciate Yang Berhormat Jason from Kebun Bunga because you have always been raising this and this is very important very close to my heart so let us move on and I that the we were look at Padang Tembak is another major priority for Urban Regeneration and of course your other question kalau berlaku cadangan pemindahan ada dua (2) konsep I just explain. Kalau kita seperti Mahsuri boleh bina dulu dalam satu tapak kosong senang apabila ia sudah bina sudah tentu mereka akan pindah kerana mereka akan lihat betapa baiknya projek-projek baru banding dengan ada yang mereka duduk di Mahsuri unit mereka adalah 300 dan 400 kaki persegi. Di projek baru kita akan bagi dalam sekurang-kurang 750 kaki persegi dengan banyak perkhidmatan lain dengan sekuriti dan sebagainya. So that is the one option berkenaan pemindahan that means we don’t roboh their bangunan they can pindah. The second option is kalau tak ada tapak we have to look into meroboh and when we meroboh mereka perlu pindah, ke mana? So usually what procedure we will take adalah kaedah dia adalah kita akan bayar sewa bulanan supaya mereka boleh buat penyewaan di tempat lain sementara menunggu perobohan dan pembinaan baru, itu saja Dato’ Speaker, terima kasih

Speaker (Speaker)EN

Thank you, please, Honourable Member for Kebun Bunga.

Jason Ong Khan LeePKR · PHKebun BungaEN

Thank you, Dato' Speaker, there are some additions and explanations. Thank you to the Honourable Member for Datok Keramat, who is concerned about PPR Padang Tembak. I only want to ask one thing. I also understand that more than RM50 million has been spent for the maintenance of PPR Padang Tembak. But why has so much money been spent, yet until now various maintenance problems still persist? That is one, and second, I want to ask whether there is a time limit for the Urban Regeneration to be implemented for PPR Padang Tembak. Third, there was an International Design Contest held since the new Government took over the first term, and all the designs and concepts are already there. And another matter is regarding the land relocation, because the Honourable Member for Datok Keramat mentioned earlier that Padang Tembak involves 9 blocks and these 9 blocks require a large amount of land. If I am not mistaken, there was once a proposal made by the previous government that, if possible, the PPR be relocated to the FRU land. So these are things we may consider, and another is that because PPR Padang Tembak has been built for 52 years, if I am not mistaken, in Korea, if a building exceeds 40 years it will definitely be demolished and compensation will be given according to the current market price in Korea, this is the position, Dato' Speaker. Whether the State Government of Penang will consider a similar policy, thank you, Dato' Yang di-Pertua.

Thank you so much Yang Berhormat, sememangnya saya mula dengan contoh Korea tak perlu pergi ke Korea juga kita perlu pergi ke Singapura sudah ada undang-undang yang memerlukan kalau satu bangunan di situ sudah 30 tahun perlu ada satu audit bangunan itu untuk melihat dia punya struktur masih selamat atau tidak and then from that we thought there will suggest whether there should be regeneration dan di Singapura mereka ada Kementerian Pembaharuan Semula not just one Jawatankuasa di Bawah Lembaga so that’s how serious they look at it because there is high risers so they have ada banyak projek di situ banyak skim di situ yang telah dibuat pembaharuan semula sememangnya itu lah apa yang kita nak lihat.

Di Malaysia, the problem is kita tak ada satu peruntukan undang-undang yang membenarkan kita membuat sedemikian rupa. Let say if Padang Tembak or we give you Mahsuri for example the 300 there 299 agreed, if in Singapore there don’t have to get 299 to agree also 70% agree they can move in, the 30% they acquire buat pengambilan balik. So we don’t have that luxury here so that is why Mahsuri seems to be a clean project to start because there is at the site, of each lot an empty lot, so when the people see that then I’m sure most will come forward and then we can move forward to demolish and build where they are existing now. Di Padang Tembak the problem is kita tak ada tanah itu but as you have said first of all, we have design competition, yes we are aware of that sudah beberapa tahun dah actually so we are looking there, it is still on the table, but we have to read the people find out what is the position is now, number one. Number two, we have to look at tanah lapang just so that we can use model Mahsuri like I said just now, easier and in fact there is one or two I identified and we are discussing there is a a PBA Quarters there, so we are discussing, there is also kilang there, I think DNE or something DNP, we are looking as well see how we can accommodate the move because Padang Tembak is the biggest of the 5 in Penang and I think your first question was in relation to the 51 millions. Ini adalah bukan dalam tempoh masa sekarang saja, as you said it is 50 over years old project 9 block some more so it’s over time inilah lajer yang kita ada berapa yang kita telah belanja untuk semua jenis penyelenggaraan di situ the most expensive was recent structurer modification we have do to the 2 block, I think all of us aware we are going to move to others 7 as well in fact there is are budget ¾ and on top of that the lift problem. Lif adalah satu penyelenggaraan yang mengambil bajet yang terbanyak so itulah jawapan saya. Thank you.

Jason Ong Khan LeePKR · PHKebun BungaEN

Dato' Speaker, just a little...

Speaker (Speaker)EN

Thank you... (interruption) I have already asked 4 to 5 supplementary questions.

Jason Ong Khan LeePKR · PHKebun BungaEN

Yes, but earlier the Honourable Member for Datok Keramat made an interesting point, which I just want to add a little to. Thank you, Dato' Yang di-Pertua. Only one thing: the Honourable Member for Datok Keramat earlier mentioned the constraint, you said that in Singapore there is fairly clear legislation that does not require 100% of residents or owners of condominiums or apartments to agree to rebuild, but in Penang, Malaysia, there is none yet. Okay, my question is, can the State Government at least let this pass the Enactment on this, and we will just be the first to pilot it. Thank you.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

I can answer this. This is not something new. I have already discussed this legal issue with three (3) Housing Ministers, asking them to make amendments to the existing laws, because it requires existing laws such as the Strata Titles Act and the Kanun Tanah Negara, these two that were allowed to us. Or I have proposed the drafting of a separate act for redevelopment, like Singapore. Unfortunately, with such a high turnover of Ministers, I would like to discuss this with the fourth one now, Datuk Reezal. Maybe Dato Yusoff can ask him to have a discussion to follow up. Thank you very much.

Speaker (Speaker)EN

Thank you, Honourable Member for Pulau Betong, please.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Yang di-Pertua of the State Legislative Assembly, my question is No. 5. No. 5. Internet connectivity facilities are very important for students (PdPR) and working adults working from home (online meetings). This is a major problem in rural areas such as Balik Pulau because internet access is very slow. (a) What are the State Government's recommendations to overcome this?

Joseph Ng Soon SiangDAP · PHAir ItamEN

No. 32. During the Movement Control Order (PKP), Work From Home (BDR) and Teaching and Learning at Home (PdPR) have become the new norm in life now. Most people face the problem of weak internet networks in residential areas. (a) What efforts and solutions have been undertaken by the State Government to overcome these challenges/problems in order to expand networks and increase internet speeds for the welfare of the state's people?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Yang di-Pertua of the State Legislative Assembly, allow me to answer Question No. 5 together with Question 32 because both are related.

Speaker (Speaker)

Okey.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you. The Honourable Member for Pulau Betong asked about the internet connectivity problem for PdPR in general, Honourable Member, in terms of expanding the network and ensuring good internet coverage for the whole State of Penang. The State Government, together with 9 Network Service Providers (NSP), namely Celcom, Maxis, Digi, Umobile, TM, Time, YTL, Vibi and Halo Technology, have jointly drawn up a State of Penang Connectivity Plan, which we call the Penang Connectivity Master Plan (PCMP), in line with the national aspiration, namely through the Jendela or National Digital Network (Jalinan Digital Negara) programme. The implementation strategy of PCMP covers the use of telecommunications infrastructure, more efficient governance management, and increasing public awareness of the use of telecommunications infrastructure. Through PCMP we have several KPIs, among them 100% availability of gigabyte speeds in the State Capital and high-impact areas, 50% of premises in low-impact areas having access of up to 500 Mbps by 2025, 100% availability of fibre optic network in schools, hospitals, libraries, police stations and post offices by 2025, average mobile broadband speed of 50 Mbps in 100% of populated areas by 2025, a drop call rate of less than 3%, and a call set-up success rate equal to or exceeding 95% in the Green Connector areas in Penang. In order to achieve the KPIs that have been set, the State Government has already introduced several new fiberisation methods, for example FTTL, Fiber To The Longkang, namely we carry out fiberisation through drain lines or by using aerial fabrication, namely by using poles. Apart from that, the State Government also helps to facilitate permits and so on for telecommunications companies to provide and develop such telecommunications infrastructure. The State Government has also reviewed the guidelines for the construction of telecommunications towers, and established the Smart Street Pole guidelines that will be implemented in the State of Penang. It has also established the State of Penang road furniture guidelines, and many more, including the Corporal Replacement Programme, namely replacing infrastructure with fibre optics so that we can achieve faster broadband. For the Balik Pulau area specifically, Balik Pulau has been identified as an underserved area, with a mobile broadband penetration rate of 80.79%. So far, a total of 973 premises in the Balik Pulau area have been covered by fixed-line broadband internet, or Fit Broadband, and a total of 37 transmitter stations have been upgraded to meet the needs and demands of the local population. Through the planning under Jendela and PCMP, a total of 1,676 premises in the Balik Pulau area will be covered by fixed-line broadband internet, while for mobile broadband there is a plan for a new telecommunications structure to be built in the area. The State Government, with the cooperation of all stakeholders including the local authorities (PBT), the Public Works Department (JKR) and the Malaysian Communications and Multimedia Commission (MCMC), will continue to monitor the need to improve the telecommunications coverage provided by telecommunications companies, so that we can reduce the digital divide among the public in line with digital usage and the implementation of online initiatives such as PdPR, Teaching and Learning from Home, the Cashless Initiative and Work From Home. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

Lee Khai LoonPKR · PHMachang BubukEN

Supplementary question. Thank you, Dato’ Speaker. I want to ask the EXCO about the Penang Free WiFi, which previously we did offer as free WiFi to residents in Penang, and I understand from my written answer No. 12 that Penang Free WiFi has been discontinued and there have been requests for proposals twice (2), but twice also no qualified bidder was obtained. Can you explain further about this matter, and will the State Government also continue to provide and make available free WiFi facilities to areas in the villages that have no access to the internet?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. As the Honourable Member is well aware, the former Penang Free WiFi Project was discontinued by the State Government for several reasons, among them the cost paid by the State Government, and then we looked at value for money because we received many complaints. The decision was made after receiving feedback. We conducted a survey of Penang Free WiFi users and found that overall there were very many complaints about speed and so on that could not be resolved by the provider company at that time, and for the cost paid, it was really not worthwhile in terms of return. Therefore the State Government carried out RFPs twice (2) to look for a new provider company. However, there was not much response; companies could not meet the requirements we set. Nevertheless, the State Government, at that time, the concept of Smart Street Pole had begun to come in, and therefore the stance we took was to replace Penang Free WiFi with the construction of Smart Street Poles in areas that may be public areas such as markets or schools and so on, where we can install WiFi on those Smart Street Poles. However, the Smart Street Pole project has indeed been delayed due to the MCO, in fact we had carried out a pilot project and so on, everything was delayed because at that time it should have been done last year, and all companies also experienced delays in implementing it, and only a few pilots have just been implemented this year, and the State Government has decided to proceed with the project, so the next RFP will be on Smart Street Pole. Right now the Local Government Division is drafting the RFP, possibly with the cooperation of the PBT. Both PBTs, we may do it by district. We do not want to create a monopoly; we want to open the RFP for companies that are interested in entering to build Smart Street Poles, and for certain areas that may be proposed by the State Assemblyperson (ADUN) himself, we can place Free WiFi in those areas on the Smart Street Poles that are built, Honourable Member.

Speaker (Speaker)EN

Thank you. Please, question six (6), the Honourable Member for Machang Bubuk.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Dato’ Speaker. My question is question 6. No. 6. To what extent is Penang State climate resilient in the face of natural disasters and extreme weather?

(a) Explain in detail the government's preparedness for the monsoon rains and drought. (b) To what extent is the effectiveness of flood mitigation projects in tackling flood problems, especially in village areas that do not have a systematic drainage system?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you once again, Honourable Member for Machang Bubuk, who asked about plans to face the monsoon season and so on. Honourable Member, the planning and preparation of design proposals for flood mitigation projects at the design stage will take into account the climate change factor requirements to answer the question on climate resilience. Indeed, the State Irrigation and Drainage Department (JPS) will take into account the climate change factor and its impact before implementing projects. The Penang State JPS, for question (A), has carried out procurement for the purchase of three (3) mobile pumps using state drainage contribution allocations in 2020. This is in addition to the 12 existing mobile pumps. So that means we will have a total of 15 mobile pumps for the whole State of Penang, which equals three (3) mobile pumps for each district. Each of the five districts will have three (3) pumps each. This is to assist in emergency situations should mobile pumps be needed. Apart from these pumps, maintenance work such as cleaning and dredging of silt and so on in rivers and Monsoon Drains is also always carried out, Honourable Member. As for the effectiveness for question (B), flood mitigation projects in tackling flood problems, especially in village areas that do not have a systematic drainage system, are carried out through two (2) methods. The first is through large-scale projects, for example the Parit Empat Flood Mitigation Project, which indirectly helps the village areas around it, including Kampung Dock and Kampung Nenas in the Parit Empat basin, and also at the Sungai Juru borrow pit. Meanwhile, the Mak Mandin Flood Mitigation Project has reduced the risk and frequency of flooding in settlement areas that have an old drainage system. The second method is outside the areas of Flood Mitigation projects, namely we will carry out drainage system upgrading works through applications from the respective District Offices. Actually, there are also many projects we carry out, especially in the SPT area, where the SPT District Office will make applications to the Flood Mitigation MMK. The Honourable Member himself is a member of that committee, and we will implement these projects, yes, it is ad hoc in fact for village areas.

Speaker (Speaker)EN

Thank you, I would like to, please, Sungai Acheh.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

Honourable Speaker, my question is No. 7. No. 7. Has the Tanjong Berembang Bridge project been fully completed by the contractor of the Penang Development Corporation (PDC)? (a) If completed, has it been handed over to the Public Works Department (JKR)?

(b) If not, what is the reason for this delay and the action taken against the contractor?

Speaker (Speaker)EN

Once again, Tanjong Bunga.

Zairil Khir JohariDAP · PHTanjong BungaEN

Dato’ Speaker is looking for it. Okay, there are too many. Thank you, Honourable Dato’ Speaker, and also the Honourable Member for Sungai Acheh. The question concerns the Tanjung Berembang Bridge. The Tanjung Berembang Bridge project is a project implemented by PDC, and according to information obtained from PDC, the project has been fully completed by the contractor and has already been opened to the public from 1 May 2021. Handover documents for the bridge such as as-built drawings and so on have already been submitted to PDC, and from PDC to JKR on 19 July 2021, and JKR is in the process of checking these documents and is expected to arrange a site inspection in the near future. This means it is complete but the handover has not yet been done, so to carry out the handover there needs to be confirmation of the road acceptance criteria audit process. Therefore, that matter between PDC and JKR is expected to be resolved in September this year. Thank you, Honourable Member.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

Thank you to the Honourable Member for Tanjong Bunga for that answer. I want to raise matters related to the bridge. When the completion period was expected to be some years ago but it was not completed, and every time at the District Action Meeting, I think at that time Jawi was also there, what is the name, Tambun was also there, it was constantly given deadlines for completion, to the extent that the PDC officer at that time walked out of the meeting. My supplementary question is, does the State Government intend, when contractors in situations like this, will they be blacklisted when there is delay, and not just for one project, but I think there are other projects too involving this company, and not only the company but all the Board of Directors of the company, that is the first. Second, the route from the bridge down from the bridge up to the exit out of Jalan Sungai Acheh is dark. Will there be an addition or is there indeed a proposal to increase lighting in that area up to the junction exiting that road? Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. I have noted the dark conditions on the route to the exit up to the exit, and I will discuss with PDC and also JKR how we can provide lighting in that area. Regarding the companies or contractors involved, not only in this project, in any project the State Government will always take this into account. If the delay is caused by the contractor's own delay, which should not have happened, then of course action such as blacklisting will be taken, and has been taken against several contractors, and not only companies. I always inform JKR and PDC too; when blacklisting is done, it is not only against companies, and it is because we have to look for the directors and also the shareholders, because we know that one person can open four or five (5) companies, all get licences, all get G7 status and so on, and if one fails, he will try another. So we need to be concerned about this matter, and indeed I have highlighted it several times to JKR too. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. Please, Air Itam.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you, Dato’ Speaker. My question is question number 8. No. 8. Cases of unemployment, especially among the youth group, are increasing during the Movement Control Order (PKP) period due to loss of jobs and their businesses being unable to operate. (a) What efforts/assistance does the State Government provide to help these young people re-enter employment and revive their businesses after this pandemic, apart from merely providing training?

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Dato' Speaker, thank you Air Itam. I am answering question number 8. The State Government's efforts to assist youths affected by job losses and to help restore their businesses are carried out through the continuous efforts of the Penang Youth Development Corporation (PYDC) under the State Executive Council for Youth and Sports (MMK Belia dan Sukan), where PYDC has taken the initiative to organise several programmes to address the unemployment problem among youths caused by the COVID-19 pandemic. Among the measures that have been taken are the following: (a)

We Want You

This programme is a career platform (with permission) launched in 2020 by YAB. Chief Minister, our leader, to match the talent required by employers and, most importantly, to reduce the youth unemployment rate in Penang. So far, 376 employers have registered on this platform and advertised a total of 508 job opportunities. A total of 875 applicants have registered as users of this platform. (b) Virtual Career Fair 2021 with the theme Explore, Connect and Get Hired. This programme was held from 26 to 29 August, organised in collaboration with Majlis Bandaraya Seberang Perai (MBSP), Pertubuhan Keselamatan Sosial (PERKESO) and Big Domain, with the aim of serving as a medium between employers and youths who have lost their jobs. In addition, this programme will also offer several additional activities to prepare youths for the world of work, such as Career Assessment & Counseling, Live Industrial Talks, Career Readiness Workshop and Live Interview with employers. As of 23 August 2021, 83 employers have registered for this career fair to recruit workers from various fields and expertise such as job seekers, fresh graduates and students undergoing industrial training. The total number of job opportunities offered by the registered employers is 7,000 jobs. So far, approximately 1,167 applicants have registered for this virtual career fair. (c) Career Readiness Programme (April and August). This programme is organised so that youths can master and become aware of the importance of, and early exposure to, the world of work. This programme is able to

enhance career skills to help them succeed in securing the jobs they have applied for and, in turn, help reduce unemployment. The programme details are as follows: IMPLEMENTATION DATE PROGRAMME DETAILS NUMBER OF PARTICIPANTS On 10 April every year i. Innovative and Resilient Mindset; • (ii) Resume Clinic; iii. Personal Image and Branding; and iv. Interview Simulation 43 persons On 21 and 22 August every year

i. Innovative and Resilient Mindset; • (ii) Personal Branding & Grooming; iii. What Employers Are Looking For?; and iv. Resume Writing & Interview Skills. 125 persons TOTAL NUMBER OF PARTICIPANTS 168. ang

(d) Penang Young Digital Talent Programme. This programme is a certification programme that will enable youths to receive certificates recognised by the State Government and industry. This programme will offer core modules and soft skills modules to participants, where the learning mode for this knowledge and skills is carried out theoretically. In addition, participants are also required to undergo 80 hours of practical sessions to ensure they practise all the knowledge they have learned. With this learning pattern, participants will receive more comprehensive exposure and be more effective in improving their development, particularly in the courses of their interest. Course Duration Number of participants First quarter Key Opinion Leader Course 21 persons Digital Marketing Course 24 persons e-Commerce Course 25 persons

Web Design Course 26 persons TOTAL PARTICIPANTS 96 persons Second quarter

Digital Marketing Course 44 persons e-Commerce Course 20 persons Web Design Course 35 persons Basic Graphic Design Course 23 persons TOTAL PARTICIPANTS 122 persons TOTAL NUMBER OF PARTICIPANTS 218 persons

The programme organised by PYDC has succeeded in helping our youths succeed in the fields they have ventured into, for example, one participant succeeded in increasing her family business income by 30 per cent even during the COVID-19 pandemic after joining the Key Opinion Leader and e-Dagang courses. She has applied what she learned from the courses offered by PYDC to manage a website, YouTube and Facebook Marketing for her business. This step has succeeded in increasing her family's income.

(e) Digitalise Penang for Youth. This programme aims to promote the development and digital transformation among youths. This programme offers opportunities to students from across Malaysia aged 15 to 35 to learn to use Web Hosting or Virtual Private Server (VPS) free of charge for one (1) year, fully sponsored by Exabytes Sdn Bhd. This will benefit young people, especially those without an educational background in information technology and the like. Eligible participants can use this platform to the best of their ability, whether for personal or business purposes, and at the same time ensure that our youths do not fall behind in this increasingly sophisticated information technology era. Exabytes is sponsoring a total of 1,000 youths and, as of today, PYDC has 123 participants who are eligible to receive this sponsorship.

The courses conducted under this programme are as follows: (i) Website Know-How 1: Domain, Hosting & VPS; (ii) Website Know-How 2: WordPress; and (iii) Website Know-How 3: Website Maintenance

Speaker (Speaker)EN

Honourable Member, how much longer will the answer take? It's not a summing-up, is it. Give an accurate and concise answer.

Soon Lip CheeDAP · PHBagan JermalEN

Young Entrepreneurs' Stories (TOE); PYDC provides a platform for young entrepreneurs to promote their businesses by sharing their entrepreneurial stories. If there are youths who have newly ventured into business after experiencing unemployment, they may join this programme. As of July 2021, a total of 30 young small-business entrepreneurs have shared their success stories. This programme has received positive feedback from young entrepreneurs, who stated that this initiative is able to help them promote their businesses. Besides sharing their success stories, these young entrepreneurs are also invited to join workshops to be organised in September, free of charge, to enhance their skills in running their businesses.

g. Reskilling, Upskilling & New Skilling Programme: PYDC Essential Skills Programme. PYDC wishes to strengthen various soft values including effective communication and the ability to work in a team, and to foster critical thinking, problem-solving, leadership, public speaking and social skills so that they are applied in their careers more efficiently. This programme offers a total of 16 modules to enhance the employability of youths, including those who are unemployed. This can help affected youths to be trained as capable individuals with high employability and the abilities required by employers. Among the modules offered are: IMPLEMENTATION PERIOD OF PROGRAMMES First quarter

i. Personal Profile Building and Job Hunting; ii. Self-leadership for personal success; iii. Personal Branding and Grooming; iv. Communication and interpersonal skills; v. Effective Time Management; vi. Managing Job and Workshop Stress; • vii. Professional Writing Skills; and viii. Selling Through the Language of the Mind. Second quarter

i. The art of self-coaching; ii. Personal financial planning; iii. Innovative & resilient mindset; iv. Public speaking: essential ingredient in personality development; v. Develop amazing social skills;

vi. Crisis leadership; and • vii. Managing transition effectively; and viii. Critical thinking & effective problem-solving.

These modules have succeeded in benefiting 1,701 youths from various segments of society. Accordingly, the Penang State Government, through InvestPenang, also continuously helps create new job opportunities by taking the following steps: i. Providing facilitation services to new investors in project implementation so that job opportunities can be created on an ongoing basis; ii. InvestPenang consistently encourages multinational companies to localise supply chains and provides facilitation services in business matching, which indirectly opens job opportunities to local businesses; iii. Ongoing collaboration between InvestPenang and other agencies to continue efforts to promote/attract investment, whether from new investors or additional investment from existing investors, while also helping the development of local small and medium industries. This opens job opportunities for local residents for employment placement by new investors or existing investors who are expanding operations; and iv. Efforts are also being enhanced to diversify investment, such as from the Global Business Services (GBS) sector, so as to increase job opportunities in high-value fields such as finance, IT, creative arts, software and human resources.

In addition, the Penang State Government, through the Penang CAT Centre, also continues to play its role in enhancing human resource growth through the "My Penang, My Workplace" campaign, which aims to help those who have lost their jobs and sources of income. Furthermore, the Penang State Government has also approved a proposal regarding the Implementation of the Business Continuity Loan Scheme (SKIM PEKA 3.0) at the recent Penang State Executive Council Meeting, which is held under the portfolio of YB. Dato' Halim. The Penang State Executive Council Meeting has approved financial implications totalling RM5 million to implement the PEKA PKS Scheme. The purpose of this scheme is to provide quick working capital loans to Small and Medium Industries (IKS) and Small and Medium Enterprises (PKS) affected by the Movement Control Order (PKP), for the sustainability of businesses after this difficult period. Under this PEKA PKS Scheme, the Penang State Government has agreed to allocate up to 30% of the allocation to micro, small and medium entrepreneurs aged 40 and below to restore their businesses after the pandemic. The Penang State Government has entrusted PDC with carrying out the matters concerned. Further information will be announced in the near future by the Honourable Member for Batu Maung.

Based on the efforts stated above, direct job opportunities will be generated and this opens up wide opportunities for those who have lost their jobs, particularly local youths. Thank you.

Speaker (Speaker)EN

Next, I invite Batu Uban.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Thank you, Dato' Speaker. My question is Number 9. No. 9. Please state the total investment received by Penang in the first six (6) months of this year. (a) What sectors recorded positive investment, and what is the total investment received by those sectors? (b) What incentives are provided by the State Government to attract foreign direct investment and domestic direct investment to Penang?

Honourable Member Dato' Speaker, thank you to Batu Uban for asking the question. (A) For January to March 2021, Penang recorded total manufacturing investment of RM1.083 billion, with the breakdown as follows: Manufacturing industry (Subsector) Total Manufacturing Investment (RM) Contribution to overall total (%) Fabricated Metal Products 433.174 million 40% Machinery & Equipment 226.001 million 21% Electrical & Electronics 163.014 million 15% Others 260.855 million 24% TOTAL 1.083 billion 100% Source: Malaysian Investment Development Authority (MIDA) Investment performance for April to June 2021 has not yet been announced by MIDA. (B) Among the incentives provided by the State Government to attract foreign direct investment and domestic direct investment to Penang are the following: (I) A 10% discount on the purchase of industrial land owned by the Penang Development Corporation (PDC) for any investment valued at RM1 billion and above. The State Government, through InvestPenang, provides various facilitation for investors covering the following matters: (i) InvestPenang as a resource centre and reference point for investors in the manufacturing and Global Business Services (GBS) sectors; (ii) Providing information on business opportunities in Penang; (iii) Assisting investors in the due diligence process; and (iv) Facilitating project implementation in Penang. In addition, financial incentives or tax exemptions are only provided by the Federal Government through MIDA or other agencies such as MCR.

Speaker (Speaker)EN

Thank you. Please, Batu Uban.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Thank you, Batu Maung. My supplementary question is, could the Honourable Member for Batu Maung provide a list of the main FDI and DDI investors that was mentioned earlier. And secondly, what about the incentives of Federal Government agencies such as MIDA and also MCR. Thank you.

Thank you, Batu Uban. For the first quarter of 2021, among the main Foreign Direct Investment investors for the first quarter of this year are Engineering Sdn. Bhd. from the United States, Industry Fabricated Metal Products, Broker Malaysia Sdn. Bhd., Industry Machinery and Equipment, from Switzerland, DYD Electronic (M) Sdn. Bhd., Electrical & Electronic, Hong Kong, Dolphin Manufacturing Solution Sdn. Bhd. Industry Transport Equipment from Singapore, Nihao Medical Malaysia Sdn Bhd (scientific and measuring equipment) from China. For domestic DDI investment, CG Solution Enterprise Sdn Bhd. Industries (fabricated medicated products). Geo Glamers Sdn Bhd. (Chemical products), Gratag Medicated Malaysia Sdn Bhd (fabricated medical product). GUH Circuit Industries Penang Sdn Bhd (electrical and electronics) and also Paradigm Metal Industries Sdn Bhd. (machineries and equipment). I have taken the list of the five (5) main ones for FDI and also DDI industries. For MIDA as the Federal agency that evaluates and approves projects, the list of incentives and also NCER, I will list these incentives and provide an answer before this Sitting of the House, that list.

Speaker (Speaker)EN

Thank you. Next, I invite Bagan Dalam.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you, Dato' Speaker. My question is question number 10. No. 10. How has the implementation of the emergency from 12 January until 1 August 2021 helped or hindered the management and operations of the State Government?

(a) Did the emergency proposed by the Federal Government succeed in eradicating the spread of COVID-19 in Penang, or was it merely for political purposes?

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Thank you Speaker, thank you to Bagan Dalam for this question. I think I will not read the question because the answer here has been prepared, I don't understand. There is just one question, two (2) parts, whether the emergency from 12 January to 1 August helped the State Government. The answer is simple, 'No'. Second, whether the emergency proposed by the Federal Government succeeded in ensuring the decline of COVID-19, the answer is, 'No'. So this emergency still exists, it has not yet been revoked by Parliament. It will be done in the September session, I think I recall. So if this emergency does not help in eradicating COVID-19, why does this emergency need to be created? I think that is really clear, the emergency is to save Muhyiddin's Government. His attempt to declare a COVID-19 emergency was rejected by the Yang di-Pertuan Agong the first time. The second time, he succeeded in establishing an emergency. He also tried a third time but it was rejected. So, my view is that the decline of COVID-19 has nothing to do with the emergency. Darurat is means to save a failing regime. So I think, Bagan Dalam knows why he asked me. Okay, thank you.

Speaker (Speaker)EN

Okay, thank you Perai.

Satees A/L MuniandyDAP · PHBagan DalamEN

Supplementary question, Dato' Speaker. Okay. My question is simple because we see that COVID-19 is getting worse. Its spread is getting worse in our country, where I have seen for myself where category 5 cases, the hospital is telling their families, they have to switch off the ventilator to give the opportunity to people who have a greater chance of survival. If it is an elderly person with comorbidities, they say he has already reached stage, they can't help you anymore, so we have to go off the machine and support some others. So I want to ask here, if the State Government agrees that the implementation of this emergency is a wasted opportunity for the Federal Government, which before this, which is also this 69 Government, to prepare the health infrastructure system and our health system to face the current situation. Where during the implementation of the emergency, no private hospital has been taken over by the Federal Government, there are not many field hospitals. Only one or two, one in Penang and one in Melaka if I am not mistaken. And there is no large-scale mobilisation of health personnel and no procurement of medical equipment such as oxygen concentrators, oxygen tanks and also ventilation machines in large quantities. So is this a wasted opportunity? Does the State Government agree if I say so?

Speaker (Speaker)

Sila Perai.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Long question. This is about COVID-19. My answer is brief. That if the government, namely the Muhyiddin Government, had initially carried out an administration that took into account the role of the State Government, the role of local administration and so on, the COVID-19 issue would most likely have been contained. But I think COVID-19 is not a problem only in Malaysia but across the whole world. So this issue in Penang, as in other states, is a vaccine issue. Because that is the priority of the State Government, and I think we have not yet received it either, although I think those who have received the first dose have also increased, in line with the second dose. Perhaps by September, perhaps we can achieve our target. So, when… (interruption).

Mohon laluan.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Later you will get an opportunity, okay? Sorry, I touched on your field. So this issue means that we have started screening, and I think screening is also good. When we have screening we see many infection cases and so on, but we do not have vaccines. So this issue is vaccines, and I received recently, we got a loan and also received assistance from the Selangor State Government. That is one thing we received. So the issue, basically, is vaccines now, and we can blame, but I do not want to blame anyone. It has reached a situation where we may be in a crisis where these cases have increased in Penang. So daily cases, there are cases every day. Some have died at home. There are cases that need to be quarantined at home and so on. Because this has been discussed at length by the relevant EXCO, only to state that we are indeed in a crisis where we cannot rely solely on the Federal Government, but we want to take the steps that we need to take to tackle such a severe crisis. Thank you.

Speaker (Speaker)EN

Thank you, Perai. Next, I would like to invite a question from Seberang Jaya.

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Dato' Speaker. My question is number 12. No. 12. Please list the infrastructure projects and construction costs that have been planned in the Seberang Jaya State Assembly (DUN) for 2019 to 2021. (a) What is the implementation status of those projects?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker, and the Honourable Member for Seberang Jaya. Honourable Member, the list of infrastructure projects that have been planned, together with construction costs, involving the area of the Seberang Jaya State Assembly (DUN) for 2019 to 2021, according to their respective authorities, is as in the attachments that will be given to the Honourable Member: Attachment A (Public Works Department (JKR)), Attachment B (Drainage and Irrigation Department (JPS)) and Attachment C (Seberang Perai Tengah District and Land Office (PDTSPT)). All the information will be in the attachments, Honourable Speaker, thank you.

Speaker (Speaker)EN

Thank you. I would like to call on Pengkalan Kota.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Thank you, Honourable Dato' Yang di-Pertua. My question is question number 13. No. 13. Home Ownership Scheme (HOC). (a) What initiatives has the State Government taken regarding the housing development sector during the COVID-19 pandemic? (b) List the efforts that have been taken by the State Government to assist home ownership among the people of Penang during this COVID-19 pandemic.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Thank you, Dato' Speaker, and to my friend from Pengkalan Kota for an important question, namely how we can assist the housing sector during the COVID-19 pandemic, how we can help the housing sector. Now, Dato' Speaker, we have been closely monitoring all social and economic aspects arising from the impact of the COVID-19 outbreak since the beginning of 2020 anyway. And from the housing sector, various direct and indirect initiatives in the form of incentives have been approved by the State Government to stimulate economic activity in almost all sectors, including the construction and housing sectors. The Movement Control Order (PKP) implemented has caused, Dato' Speaker, many construction projects to be forced to stop, thus hampering the momentum of the construction sector. Apart from recent developments, the impact of the sudden increases from the beginning until now, more sudden, in the cost of raw materials has also affected the supply chain of the construction industry in the housing sector. Now, this problem, Dato' Speaker, has prompted the State Government, as a facilitator, to introduce various initiatives under the Property Sector Stimulus Policy and the Residential Ownership Policy, also known as the Home Ownership Campaign (HOC), which was introduced for the first time in June 2020. We have recently extended it, Dato' Speaker, as version 2.0, which from June, when it ends at the end of this year, to June next year. This is compared with the Federal Government, which also has an HOC, but they only extended version 2.0 for this year, only to the end of this year, whereas we decided to continue it for one year. Until we can control, or achieve herd immunity against, this outbreak, Dato' Speaker, the industry needs to plan the readiness of residential environments for more comfortable Affordable Housing (RMM), with larger spaces and local facilities that can empower the community should the Movement Control Order requirements be activated again. Now, in this pandemic and in the MCO, we see two (2) main aspects of the household, of the home, that we need to pay attention to, namely the economic impact, number one, and also the need for comfortable housing. So, we have to look at the spending power, which has been affected drastically as a result of COVID. And where housing is concerned, we also have to assist, so in that regard, (with permission).. Dato' Speaker, in our HOC we have approved a 10% reduction in the maximum price ceiling of Affordable Housing types C1, C2 and C3 in Penang, namely generally, for RMM (Affordable Housing) of 850 square feet, from RM300,000.00, the ceiling in Penang before the HOC, the 10 percent reduction now is RM270,000.00. And in the Seberang area, RM250,000.00 is its ceiling; 10 percent now is RM225,000.00 per unit. Although developers wish to maintain their prices at the original RM300,000.00 or RM250,000.00 respectively in the Island and Seberang, they are allowed to, but subject to them having to increase the area to a minimum of 900. Earlier, RM300,000.00 is 850 sf. Now they want to maintain RM300,000.00, they have to increase it to 900. So that is why we say, in economic terms, to reduce the price so that they can afford more. Number two, in terms of safety and also comfort, if you want that price then you have to increase the size to 900. So Dato' Speaker, I think that the details in the answer in relation to all the pricing range in accent and 10 percent because we have many different products, so that is our first step in HOC, which is important. Many others, but I bring the main point first. The State Government will also boost the property construction sector, especially residential, as a driver of Penang's economy, because I think, the housing industries, Dato' Speaker, assist Penang because every unit of house that is built about 140 industries are concerned. If can enjoy and rip the rewards of that unit being built because it's from the time the developer builds to the time it is built to the time your furniture goes in, it is all affected. So what we want to do, we also want to do the first strategy, which is to reduce the number of units in overhang. Overhang refers to residential units that cannot be sold within nine (9) months after obtaining the CCC. In Penang we found there are 3035 units in the fourth quarter of 2020, last year, first quarter for 3035 units, with a value of RM1.07 billion. This is from the National Property Information Centre (NAPIC) of the Ministry of Finance, so we want to see how we can help drive sales of these units, where we have already given many concessions to foreign buyers in our HOC, but even so we do not know whether they can come or not, because COVID-19 is affecting the entire world, so that is one.

Speaker (Speaker)

Summarize…

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

The second strategy, Dato' Speaker, is also to provide a higher plot ratio so that more units can be built, namely a plot ratio of 4 to 1 (4:1) compared with 3.5 to 1 (3.5:1) previously. Now, I just want to end by saying that although we give incentives in the aspect I mentioned earlier, reducing the price by 10%, some people cannot even afford that, and this is not just for RMM, RM270,000, RM225,000. I said earlier, even Low-Cost Houses and Lower-Middle Cost Houses are difficult, and many find it difficult to access them, because before COVID-19 we already had a big problem with the banks in terms of getting loans. I always said this at the DUN, so imagine how difficult COVID-19 has made the situation. So we have one approach from our Penang vision, which by 2030 has a target of 220,000 units, 230,000 units of Affordable Housing of various types, from Low-Cost Houses and Lower-Middle Cost Houses to various Affordable Housing. Out of the 220,000, we made a new decision recently, through the HOC also, to ensure 10% will be sold through the hire-purchase method. Previously the problem was that we gave offer letters, they went to the bank, they could not get a loan, rejected, 6 to 7 out of 10 such cases. So what we do with hire-purchase is they do not need to get a loan; they deal directly with the State, namely now the Housing Board (Lembaga Perumahan), and we will provide at least 10%. If the offer is RM220,000, that means RM22,000. So, for everyone's information, so far my record shows we already have 2501 units that we have distributed through this method, and this will definitely help those in difficult circumstances. Thank you very much.

Speaker (Speaker)

Terima kasih.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Thank you, Dato' Yang di-Pertua Dewan. Thank you for the very thorough answer provided by the Honourable Datok Keramat. We indeed see in the State of Penang, especially regarding home ownership, that many efforts have been made by the State Government, and often we also seem to be treated like step-children by the Federal Government, especially in the provision of Affordable Housing. But recently we welcomed a new Minister of Housing and Local Government who also originates from this State of Penang. So my question is, what are the intentions or aspects that the State Government wishes to raise for attention, and hopes that further action can be implemented by this new Minister, who is also the Member of Parliament for the Kepala Batas constituency. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you to the Honourable Member for Pengkalan Kota for the supplementary question. I will summarise: actually, last week when he was appointed Minister, I, together with the Housing Board, sent or prepared an official letter to him to hold a meeting to discuss many matters still outstanding from the Ministry of Housing and Local Government (KPKT) to the State of Penang. In fact, coincidentally, today we will send that letter to him, and we hope there will be a meeting as soon as possible. Among other things, in that letter we have requested, Dato' Speaker, the provision of Affordable Housing from the Federal Government, because we have not seen it for a long time. Although there are one (1) and two (2) PRIMA earlier that are ongoing, until now they have not been fully completed, and we hope there will be more. These are very old pending cases; even during the former Chief Minister's time, until today we are still waiting, but we hope for more to come. That is the most important thing in terms of this housing provision. Of course, there are many other issues; just now the Honourable Member for Kebun Bunga mentioned legal matters, and that is in the letter also to Dato' Reezal. Number three, I would say, there are a few others. One more important thing, just as I said earlier, I mentioned maintenance matters. I spoke about Padang Tembak, but across the whole of Penang we have spent some RM281bilion… (with permission).. as I said just now in my answer. So we also hope that from the Centre, they also have several funds, now TPP and TPPM, which were rebranded earlier from TP1Malaysia, but they also have. So, to be fair, Dato' Speaker, last year we applied, this was under the former minister, the Honourable Zuraida. We applied last year, 2020, for 100juta worth of projects under the Central maintenance fund, and to be fair, I would like to state that they gave for the fund, before KPKT channelled RM35.1juta. For this year we applied for RM87milion, RM86.94juta, and so far we have received RM18.4juta, to be fair. But that means there is still room to discuss. Only with so many changes of Minister, I hope their board understands well, because this is a long ongoing process. That's all, thank you, thank you very much.

Goh Choon AikPKR · PHBukit TambunEN

Additional, Dato' Speaker, on housing. For the Honourable Datok Keramat in the State Assembly (DUN) area of Bukit Tambun, there are 14 low-cost flat housing schemes. The owners who occupy these low-cost houses are a minority; most are rented out to locals, and many are rented out to foreigners, and now they have become quarantine places for factory workers confirmed positive. Do we have provisions to force owners who rent to others, or do we have legal provisions to acquire housing units not occupied by the owners themselves? That's all, thank you, Dato' Speaker.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Okay, thank you so much, Honourable Member for Bukit Tambun. Most of the question being asked actually has related questions, but a very quick one first of all. Rumah Kos Rendah and Rumah Kos Sederhana Rendah should not be occupied by anyone other than the owner. It has to be owner occupied, so when there are rentals, whether to locals or, we know, mostly foreigners who swarm many low-cost housing schemes, it is not proper. But I have raised this, this is another issue I raised in the letter to Dato' Reezal, that it was said in the House that the Developers Act in its schedule does not state that it must be owner-occupied, because the Act is one for all. That means even for high-end normal property, low cost and low-medium cost. So if I am an investor and I buy a normal property, not low cost or low-medium cost, I have the right to rent it out to whoever I please or choose to rent it out, but this is not captured in Schedules G and H of the Developers Act. That is the issue, number one, so that has to be looked at as number one. Number two, of course I know we have a problem with foreign workers, especially in all housing schemes, including here in Bukit Tambun. Of course we know, and as mentioned yesterday, the majority of cases come from workers, from factories and so on. The percentage is very high from there, so it is very worrisome, indeed. And now you are telling us, of course we know, again, it is used as a quarantine place because that is where they live. So how can we tackle this? I might as well answer this straight away as it is a very, very important question. We do have projects or programmes to build workers' dormitories, but to build workers' dormitories, two are already completed, one in Bukit Minyak and one here in Batu Maung. There are several more that will look at the whole thing, which is nearly 76,000 or more, something like that. I don't have the exact number, but it is around beds or bunks that will be provided. Those that are completed are okay, but those not yet completed are new buildings that have just been built. But COVID-19 does not wait for us, we cannot wait, so we have to look at new approaches. So through discussions with the Labour Department (JKT) in Penang and of course the Ministry as well, the Ministry of Housing and Local Government (KPKT), it was agreed that for the short term we look at a new approach, namely two (2) things on how to house these foreign workers. Number one, we look at the factories themselves. Previously, within factory sites, it was not allowed by the Department of Environment (JAS) because of buffer zones and so on. But there are some very large factories where there is still vacant land within the factory that can be used as a temporary measure so that they do not roam around housing schemes and bring social problems to locals. So that has been permitted, and several factories have already entered the plan and been approved. I know of two in Seberang. Number two, the second short-term approach is that we look at some commercial schemes where there are vacant units, and these commercial schemes are far from housing schemes. We can consider, if there is a lot of empty space, granting permission for them to be used as residences only... (interruption...)

H’ng Mooi LyeDAP · PHJawi

Soalan tambahan.

Satees A/L MuniandyDAP · PHBagan Dalam

Soalan tambahan.

Speaker (Speaker)

YB. Jawi.

H’ng Mooi LyeDAP · PHJawiEN

Request for explanation. It relates to my question number 16. However, I do agree with what the Honourable Member for Bukit Tambun said, that there are many low-cost housing schemes in the SPS area. There are 17 in Jawi, and most of these low-cost housings are abandoned, okay. I want to ask whether the State Government housing can buy those abandoned units and rent them back to the poor, or, if under the state government's laws the government is not allowed to buy, whether it is possible for us to set up a subsidiary company under the State Government so that we can buy back the abandoned units, especially in the SPS or SPT areas. I think SPT, the Honourable Member for Berapit has also raised the issue of abandoned low-cost housing, so I seek the views of the Honourable Datuk Keramat. Thank you.

Thank you to rakan saya daripada Jawi. Jawi also we know banyak kes skim perumahan 17 yang dinyatakan. Actually, tadi Yang Berhormat Bukit Tambun I forgot to answer your question, you did ask the same question as Jawi just now, whether dalam skim ini kita boleh acquire, same question. I’m sorry I did not answer, I will answer it together. First of all, kita telah pun kaji sama ada ini boleh dibuat ini bukan satu perkara baru tapi I think seperti mana Jawi sedia maklum kita ada kekangan dari segi perundangan sedang kita melihat kepada itu, nombor satu. Nombor dua, Lembaga Perumahan Negeri in fact kita sedang buat kajian secara menyeluruh di keseluruhan skim-skim perumahan kita untuk mendapat satu detail butir-butiran yang terperinci untuk lihat bagaimana kita boleh teruskan dan mara ke hadapan. I think it boils down to legal aspect again, but it is a very good idea we have a mull over it before, if that can be done then certainly that is one way forward because there are already ready units and we can tackle COVID-19 or warga asing yang duduk di skim-skim perumahan dengan minta mereka pindah ke situ so memang sedang dikaji. It is a very good point that you have raise, thank you very much…(gangguan)..

Satess A/L MuniandyDAP · PHBagan DalamEN

Dato' Speaker, may I ask one more minute?

Speaker (Speaker)

Tanya.

Satess A/L MuniandyDAP · PHBagan DalamEN

Okay, thank you, Dato' Speaker, and also to the Honourable Dato' Keramat regarding this question on the House Ownership Scheme, or Skim Pemilikan Rumah. I thank the State Government for being willing to provide housing for the resettlement of residents of Kampung Ujung Batu in my area. However, construction has stopped for a long time, and when I asked the developer why there was no progress, he said there has been no discussion with the Penang State Housing Board since it was converted into a Housing Board.

So, if possible, I ask the Honourable Dato' Keramat to take note and direct that negotiations begin for the resettlement of Kampung Ujung Batu. Thank you, Dato' Speaker.

Thank you just a very quick one. Memang ada satu projek di kawasan perkampungan Ujung Batu yang akan kita pindah mereka. Di mana ada satu projek yang kita telah beli in fact ada satu kertas telah pun dikemukakan ke pihak Kerajaan Negeri baru-baru ini supaya apabila itu berlaku kita boleh pindah mereka di situ agar Ujung Batu the entire land will become free from encumberment and we can take it over the state and do other projects there but now in the question is relocation actually, question on this I will update you later the answer. Kalau saya tidak silap Dato’ Speaker, ada timeline perbincangan sedang berlaku dan ada timeline I will get the answer but just to be sent created our pass it I think bertulis question Dato’ Speaker.

Speaker (Speaker)EN

Thank you. Honourable Members, the 1 hour 30 minutes for oral questions has now ended in accordance with sub-rule 26 (7) of the Rules of the Penang State Legislative Assembly. Please.

Y.A.B. Chief Minister:

Honourable Dato' Speaker. The answers to the oral questions that were answered just now will be placed on the tables of the Members who asked them and will be included in the Official Report.

Speaker (Speaker)EN

Thank you, Honourable Member. Honourable Members, we already held a debate session yesterday, and according to the decision I made yesterday, today we will begin with the winding-up. However, to allow several Honourable Members to take part in the debate again, I have discussed this and decided that this debate session will not go beyond 1.00 p.m. later. And once again, although I allowed more time for the debate session, I am considering appeals from Honourable Members who asked me to summarise and shorten the sitting period, but when I opened the debate session, the Honourable Members had no limit and had caught the microphone syndrome. I hope today I will still allow debate until 1.00 p.m., and I would like to invite Honourable Members to debate the motion of thanks for the Royal Address. Please, Air Putih.

Lim Guan EngDAP · PHAir PutihEN

I want to raise a point of order. It has nothing to do with the earlier debate. I want to ask the permission of Mr Speaker because yesterday, when we discussed the Bill to amend the Penang State Constitution Enactment, it was passed unanimously. I thank all the State Assembly Members who gave their support to this very important constitutional amendment.

I only want to raise one technical matter, because according to Article 35 of the State Constitution, amendments to the State Constitution require a two-thirds majority, that is indeed Article 35(3). But although we received support from all ADUNs, including the Opposition, we thank them, but no division was taken. I want an explanation and clarification on this matter, because if there was no division, how can we ensure there was a two-thirds majority? I raise this matter because we want this amendment to proceed or be recognised as valid. I hope to get an explanation from Mr Speaker. Thank you.

Speaker (Speaker)EN

Thank you, Air Putih. I think I explained here that I had already taken note of this matter earlier, but if we look at State Constitution 35 (4), where I read, "An amendment made for the purpose of harmonising this Constitution with the provisions of the Eighth Schedule to the Federal Constitution in force or arising from any Enactment as referred to in Article 11 is exempted from the provisions of Clause 3," which is what Air Putih meant. Therefore, I used this provision to decide on the approval of the Bill last evening. So I hope the House is informed. Thank you. Air Putih.

Lim Guan EngDAP · PHAir PutihEN

Yes. Thank you. That is a consequential matter, but if we can, I think there is no problem if we hold a division to make sure.

Speaker (Speaker)EN

Air Putih, yesterday, if asked, everyone agreed unanimously. I am using the word sebulat suara.

Lim Guan EngDAP · PHAir PutihEN

But that is my view.

Speaker (Speaker)EN

Thank you for the advice.

Lim Guan EngDAP · PHAir PutihEN

Yes, alright. No problem.

Speaker (Speaker)EN

Please, the debate session, Honourable Members. Anyone wishing to debate. Air Putih, please.

Lim Guan EngDAP · PHAir PutihEN

You speaking, is it? Okay? Has Bagan Dalam spoken? If so, I will give way to him.

Speaker (Speaker)EN

If I give way, there will be no time later. I think, I say sorry to Air Putih.

Lim Guan EngDAP · PHAir PutihEN

Because I hope we can ensure Bagan Dalam has the opportunity to speak. I do not want to take his place.

Speaker (Speaker)EN

Please, Air Putih.

Lim Guan EngDAP · PHAir PutihEN

I thank Dato' Speaker and also take part in the motion of thanks for the Royal Address of Yang Terutama Tun, which was tabled on Monday, 30 August. Here I think this noble House focuses on the issue of COVID-19 and also the economic recession that has hit the country since March last year. We all know that the problem of COVID-19, its failure, stems from the failure of the Federal Government's administration to tackle the pandemic and economic crisis. At the same time, what the State Government has tried to do is take mitigation measures, such as what the State Government has mentioned, that assistance amounting to RM177 million has been extended, but (with permission)... this is a mere drop in the ocean. How far can the State Government provide assistance when such a huge problem has struck all levels of the people? That is why, when the Federal Government does not carry out its responsibilities properly, we face an increasingly acute COVID-19 problem every day, and also an economic recession that not only destroys people's livelihoods but also families and households in general. I want to discuss this matter briefly because many points have already been spoken by other Honourable Members of this House. One is that if we look at the rise in COVID-19 infections in Penang. Originally Penang was a green zone, being among the states that showed what is said to be the best performance in Malaysia, but recently we see that not only COVID-19 cases, COVID-19 infections are rising, but deaths are also rising. Here we need to implement measures that can, as I mentioned earlier, be mitigation. Reduce the adverse impacts that occur, and I want to see, or we want to make an assessment, at granular data level. If we look at the current infections, nearly 90,000, but if we make an assessment of deaths in terms of infection, it can come from any place, but if we look at and assess deaths at granular data level, I want to share the answer I received, an answer to a written question where it was stated that for this year, from 1 January 2021 to 11 August, the Ministry of Health (KKM) has announced a total of 258 COVID-19-related deaths. Malay 106, Chinese 104, Indian 32 and citizens 16. This again emphasises that COVID-19 is a pandemic that does not discriminate by race, religion or background. Everyone will get COVID-19. Do not say that if you are such-and-such, you will not get COVID-19. No. This is a problem and a common crisis that we can only win if we tackle it together. And if we assess these figures, Dato' Speaker, another question of mine: on 26 August there were 469 COVID deaths in total. In 2020, only nine (9) people died for the whole year, nine (9) people who died, but for this year up to 26 August there were 469. That means in the period of 15 days between 11 August, when there were 258 deaths for this year, last year we do not want to take into account because of nine (9). From 258 to 26 August there were 469 deaths, in a period of 15 days, 211 deaths. That is something very worrying. What has happened, when it was considered controlled or under control, suddenly it lost control. Where preventive measures from targeted became suddenly misdirected, certainly the Ministry of Health must take full responsibility and the Government must also take full responsibility on this matter. The serial implementation of MCO or PKP is not effective at all. The implementation of the emergency has made the situation even worse, and that is something where we were given a false picture that PKP and the emergency could overcome our problems. When it is not implemented properly, there is double standard in enforcement, there is U-turn in SOPs, there is flip-flop policy, no commitment to ensure PKP can be implemented properly, and that is why when we say total lockdown is beautiful, it is only beautiful in appearance, because it did not succeed at all, and that is why total lockdown has instead made the situation more acute because it gave a false assumption of comfort, a forced sense of comfort and security. Dato' Speaker, if we look at these figures, we need to study why the numbers suddenly rose. We must take steps to go granular. If the Federal Government does not want to do it, I suggest that the State Government does it. Let us be leaders in this matter. I want to share figures where I think we must be more dynamic, more aggressive, because we want to save the lives and livelihoods of the people of Penang. I see here the breakdown of COVID-19 death cases. According to the state constituencies (KADUN), the number one is Air Itam, with 21 deaths. These are detailed figures up to 11 August for this year only. The highest number of deaths is from Air Itam, 21 deaths. Number two, Penaga, 14. As I said, that is the problem of the people, regardless of race, regardless of religion. Number three, Jawi, 13 deaths. Number four, Permatang Berangan, Pengkalan Kota, Batu Maung. Here I want to suggest that if we know which state constituencies have the highest or among the high number of deaths, why do we not focus on those areas? Fortunately, areas such as Padang Lalang, Pulau Tikus, Padang Kota and also Air Putih have no deaths in our area, but that is not something we can feel comfortable about, because it will happen eventually. If we look at these figures at granular level, we must also take steps on this data so that we can see why most deaths are concentrated in those areas. If the Federal Government does not want to do it, I hope the State Government can consider this matter so that appropriate measures can be implemented. This is granular, look, examine the motion, what is the basis, what is the cause. Another point, if we look at the data, the data where we do ageing... (with permission). Where we look at the ages of those who died this year. Out of these 258 deaths, 44 were under 50 years old. 214 were over 50 years old. This means 83% of the total deaths were those over 50 years old. So, Dato' Speaker, I want to suggest that we give priority, although apart from preventive measures, we give priority to those aged 50 and above, especially in terms of vaccination. Here I want to thank the Menteri Besar of Selangor for being willing to donate 20,000 vaccine doses to the State of Penang. He came himself to make this donation, and I hope these 20,000 can be given to those who need them. If not those aged 50 and above, then to hawkers and traders. I think if we want to reopen the economic sector, we must ensure that hawkers, traders and their workers are protected in terms of vaccination. We know there are many markets today. I hear that the Padang Tembak market also has to be closed. Isn't that right?

Joseph Ng Soon SiangDAP · PHAir ItamEN

Dato' Speaker, may I interject. The Honourable Air Putih's comments about the State Government's donation of 20,000 doses are certainly welcome. Here I would like to propose to the State Government that these 20,000 doses be distributed to our respective state constituencies so that we can run the PPV Outreach programme to help our areas, because previously we had many applications to run the PPV Outreach but could not carry them out due to insufficient doses and also the State Government's quota. So, in this case, since this is a donation from the Selangor State Government, I hope it can be distributed collectively to the 40 State Assemblymen to run the PPV Outreach. Thank you.

Lim Guan EngDAP · PHAir PutihEN

I will answer this first. I think that is one of the proposals, apart from my proposal that we look at their age, as I mentioned, that those aged over 50 should be given priority. Besides that are the hawkers. Every time we see the markets closed, we know these hawkers lose their livelihood as well as risk losing their lives. I hope this matter can be given consideration. Seberang Jaya, please.

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Air Putih. I think in facing the COVID-19 pandemic, one thing we have learnt over almost this past year is that we need the whole government, the whole society approach to tackle this pandemic problem. There are many disputes, but surely our intentions are the same. We want to protect the lives of the people and also protect their livelihoods. I was interested when the Honourable Air Putih raised the donation of 20,000 doses from the Selangor State Government, which in my view we appreciate, the contribution from my friend, the Honourable Menteri Besar of the Penang State Government, but the amount is still small, these 20,000 doses. Let me take as an example the number of vaccine recipients under the PIKAS programme under the Ministry of International Trade and Industry (MITI) alone, who have received two (2) doses in Penang alone, which already involves 155,000 workers to date, and there are many more national programmes from the Federal Government to help. My question is, I am not sure what the State Government's plans are, other than just receiving donations or hoping to get more vaccine donations. Does the State Government actually intend to purchase vaccines? If the Selangor State Government can buy and give charity to Penang. Does the State Government have the capacity to purchase? Firstly. Secondly, we have seen the Surge Capacity Programme carried out by the Federal Government in Kuala Lumpur and the Greater KL has succeeded in achieving herd immunity and we have seen the number of cases rise in Penang. Penang is the capital of the north, roughly speaking, if we may say so. Our population density is high, and would the Honourable Air Putih agree with me that we also ask the Federal Government to consider having us carry out a Surge Capacity for Penang State and this northern region as a whole. Thank you.

Lim Guan EngDAP · PHAir PutihEN

I think the Honourable Seberang Jaya should make his own statement on this matter. That is the view we have already raised. The important point is that if we mention the 155,000 doses under PIKAS and so on, they still have to be paid for, so they must pay RM90.00. What I am saying here is that where free provision is carried out by the State Government...(interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

That is free, Honourable. What has to be paid for is the service.

Lim Guan EngDAP · PHAir PutihEN

But still it has to be paid for. We can say the vaccine is free, but the cost is the same and still has to be paid, but what was given by the Selangor State Government was free. That is a cost of RM3.5 million, and I thank them for that, following discussions between myself or my colleague and the Selangor Menteri Besar. We appreciate it. Perhaps if we want, we want to ask for more, but what is given sincerely from the heart, we thank them for and appreciate it from within our hearts. So that is what is important...(interruption). I want to finish my speech...(interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

What I meant is, does the State Government, does the Honourable Member agree....(interruption).

Speaker (Speaker)EN

Seberang Jaya will have an opportunity later.

Lim Guan EngDAP · PHAir PutihEN

Here, where I mentioned that we must ensure that the donation is used with high impact. High impact. High impact, that is, for hawkers or those aged over 50. I think that is important. Secondly, regarding vaccines. I myself have already made such a proposal and it was discussed through the Honourable Member for Bangi with the Minister at that time, KJ, and it seems there was an understanding to appoint a coordinator as done in the State of Selangor, but I do not know whether the EXCO has agreed on this matter. Perhaps the EXCO can answer whether the State Government supports appointing a coordinator for the OSC, Operation Surge Capacity, just as was done in the Klang Valley, which succeeded in achieving herd immunity or community immunity, where now the first dose stands at 100%. So we hope this matter can be given attention, and the answer just now. What I want to stress here is that not only must vaccination be accelerated. 464 people have died since the vaccination programme began in February this year, and if it can be expedited we can save many more lives. I think this is a fact. 15 days, from 11 August to 26 August, 15 days, 211 people have died in Penang. If vaccination could be accelerated, perhaps these 211 lives could be saved. I still remember what the Deputy Chief Minister of Sarawak, James Masing, said when his own younger sibling passed away: what if the vaccine could arrive faster, my younger sibling or older sibling would not have died. They would still be alive. That is why there should be no delay. I ask the Health EXCO to please take this matter seriously, because any delay may trigger or result in the loss of lives. We do not want to talk about loss of livelihood. So that is why...(interruption)

Speaker (Speaker)EN

The EXCO will respond during the winding-up.

I have an answer.

Speaker (Speaker)

Tidak mengapa. Its okay.

This is answer just one minutes tidak sampai.

Heng Lee LeeDAP · PHBerapitEN

Asking to interject too, from Berapit. Air Putih.

Speaker (Speaker)EN

No, no, no. Air Putih, please.

Lim Guan EngDAP · PHAir PutihEN

Yes, I will give a little. Just now Berapit, and later the Honourable Penanti may speak. Honourable Berapit.

Heng Lee LeeDAP · PHBerapitEN

Thank you, Honourable Air Putih. I was very interested in the figures from Air Putih relating to the death figures in Penang. I also agree that if vaccination is given early, the death rate in this state may perhaps be reduced. But for me, it is not only vaccination. I think the way to fight COVID-19 should be that we have one information or standard SOP, what is called a standard, for everyone. This morning while I was driving my car to the Assembly, a voter called me, "how did he get it, because his father has already tested positive". I think for all Honourable Members in this august House, this is not something new; each of us may already be a CAC hotline. So why, why can this state not have a standard SOP or a guideline on how a family with a positive patient should conduct themselves? And what I want to agree with the Honourable Air Putih on is that if the Federal Government cannot do it, I propose that the State Government can. We can set up a 24-hour hotline regarding anything related to COVID-19...(interruption).

Speaker (Speaker)EN

Honourable Member, I think there is a little information in the speech yesterday, in the answer relating to CAC...(interruption).

Heng Lee LeeDAP · PHBerapitEN

Not just CAC...

Speaker (Speaker)EN

Please shorten it.

Heng Lee LeeDAP · PHBerapit

Okey boleh.

Speaker (Speaker)EN

If not, it will affect Air Putih's time.

Heng Lee LeeDAP · PHBerapitEN

Dato' Speaker, thank you. Because according to the answer I received. How many people have lost their jobs throughout the COVID-19 outbreak? According to records from the Social Security Organisation (PERKESO), the number of workers retrenched throughout this pandemic from January 2020 until 13 August this year is 12,893 people. With so many people losing their jobs, we also need some workers at this time to resist and fight COVID-19. I propose that the State Government could hire workers who have lost their jobs. Set up a temporary team that is well trained and give all information to them, so that anyone who needs information can call this hotline within 24 hours; through this phone they can find out what they can do.

Speaker (Speaker)EN

Thank you, Berapit. Air Putih, please.

Lim Guan EngDAP · PHAir PutihEN

I thank the Honourable Berapit. What he has proposed may become part of my speech. I want to stress here. This should be the responsibility of the Federal Government. Its failure to implement it is also a failure of the Federal Government. What we propose here is merely to ask to correct or do what can be done so as to atone for the failure of the Federal Government to take mitigation measures. So, that is not what we call a State Government fault, because the responsibility should come from the Federal Government. But because they failed to do it, we must look at how we can take steps to atone for the mistakes and failures of the Federal Government. And as mentioned earlier, not only must the vaccination process be expedited, but also in terms of support. Support for health services. When someone gets COVID-19, they call and there is no answer. No answer at all. They call an ambulance, it does not come. They ask to go to hospital and cannot get treatment.

Here I want to stress that we want to thank all frontliners, doctors, nurses. We salute and applaud them. But they have not received the proper support from the Federal Government. That is why we hope the new Minister of Health can do something to rectify this situation so that there are enough resources, enough staff and support services, so that those who are sick, those who test positive for COVID-19, can receive proper treatment. Otherwise, if you get COVID-19, this is like a death sentence (with permission), it is worse for you than being imprisoned, because you will be fully isolated. Honourable Member, please.

Dato' Speaker, may I interject. Would Air Putih agree if I give the perspective that this vaccination programme has its policy plan. We were briefed by the Minister in February. The first weakness, before we move forward, we want to learn from past weaknesses. First, the slowness of the Federal Government in making procurement. That is the first factor, which the Minister also did not deny, slow procurement, slow ordering, why? Because they waited for clinical trials of the vaccines being produced. Whereas other countries in the world, the UK, the United States, Australia, New Zealand, Israel. When the clinical trials were being carried out, they did not wait for the results, they placed their orders first. Kedah people, Penang people say "chop first". When the clinical trials are completed, one, two, three, we take first. We did not. While competition to obtain supplies was very fierce, we as a small country waited for clinical trials, while developed countries ordered first. So it arrived late. When we were briefed on the national vaccination plan, what the target was, how many registered, and so on. That target was never met. That is the first fact. Secondly, when implementation was actually carried out, there were other considerations. Are we aware that Sarawak is number one in percentage terms? Its neighbouring state Sabah is the lowest of all. Why? Because the Federal Government's consideration was to prepare Sarawak for the State Election. So lives there are more important than the lives of people in other states. Politics in ensuring supplies arrive, that calculation is different. It is not a matter of whether the State Government is willing to buy or not. The vaccination policy plan was prepared by the federal government; we are the end receivers. So that is why I agree when Air Putih says that the weakness exists, when we admit it, we want to move forward. This is not a blaming game (with permission), but I want to mention it. There is an anecdote I read on Facebook. Puan Rahmah Ghazali is a former Press Secretary to Air Putih. She now lives in the UK. One day she was tested, she and her family tested positive at level 1. She was ordered to quarantine at home. Every day the NHS, like our KKM, called. Puan, do you have any symptoms today? Are you showing symptoms or not? So, she responded that today she is okay. Morning call, afternoon call, night call. At the same time the local authorities (PBT) also called. Do you need a grocery delivery service for us to buy? That is called a support system. We not only trace, track, test, isolate. We also support. Here is where our system is lame, missing. Okay, that is the view, whether Air Putih may include some of it in his speech. Thank you.

Lim Guan EngDAP · PHAir PutihEN

Indeed I agree to include it as part of my speech. I will shorten it. That is an important matter because if the Federal Government completely fails to carry out its responsibilities by providing support to frontliners. We in Penang, we see how the State Government can atone for this failure, rectify it, at least to take mitigation measures so that our people do not suffer so much. And I want to mention PPV again. This PPV I hope

that the State Government can consider approving PPV by NGOs, including Tzu-Chi. Everyone knows the contribution of Tzu-Chi to society, their charitable work. Yes, I know, I understand that Tzu-Chi was ultimately not granted approval by the State Government because the Federal Government could not guarantee sufficient supply, but that is not the State Government's problem, that is the Federal Government's problem, because supply is not the State Government's problem. So, can we approve, let the vaccine supply problem be managed by the Federal Government, so that we do not disappoint those who truly want to serve and do charitable work. I believe everyone here knows what Tzu-Chi's contribution is in general, in common. Regardless of race, regardless of religion. So we hope it can be given consideration. And finally, regarding compounds. That is an important matter, PKP compounds, the Movement Control Order (PKP). My written answer is that the total fines compounded for 2020 due to SOP violations is 3,648. Of which the amount collected was RM2,085,000.00, that is, 3,648 violations, collected 2,000. But for 2021, after the PKP and also the emergency, it was increased further: 3,762 have been compounded, and RM2,115,000.00 has been collected. Although the collection is nearly the same as last year, the compounds were double, RM4,230,000.00. We know that this is due to the emergency, and the emergency was announced by the Government in Parliament on 23 July that it would not, it has been cancelled, and the Minister of Law at that time also stated that it would not be enforced. That is why, if we look at this information. In 2020, 104 cases were brought to court, for the compounds issued in 2020. But for 2021, not a single case was brought to court because of confusion about the offence or enforcement under the Emergency Ordinance.

Speaker (Speaker)EN

Seberang Jaya. Seberang Jaya. Okay, continue.

Lim Guan EngDAP · PHAir PutihEN

Yes, that's mask. That is why it is important that we ask whether we can obtain information from the Attorney General's Chambers or Dewan Bahasa dan Pustaka (DBP). When cases were brought to court last year, this year there has not been a single case. Is it because the Emergency Ordinance has a problem? We know it has not succeeded in fighting COVID-19 and has instead become worse. It was indeed a move to save someone's political career, which in the end did not succeed. But here, we hope this matter can be abolished. The compounds issued can be abolished, and for those who have already paid, a calculation should be made on how it will be handled, because the government itself has stated in Parliament that from 23 July it will no longer be in force. This is an important matter because a large sum is involved. The fine has been increased to RM50,000.00 for individuals and RM100,000.00 for companies. That is not a small amount. I hope this matter can be given attention, because Dato' Yang di-Pertua, its validity and the misconduct in its provisions are disputed, and we here have already stated, I think not only me from DAP but also our partner parties, that if they want to bring those who accepted compounds to court, we will provide lawyers to defend them in court, because this is a law that should not be implemented and is unreasonable. I hope this matter can be given due attention, because what is important now is how we can win against COVID-19. That is why we are ready to extend a hand or cooperate to ensure we can win against COVID-19. Although this matter is not easy, if we ensure that experts make the decisions, not those who are skilled at politics but health experts who make the decisions. We must ensure that assistance is delivered directly to those who need it, not through middlemen, and most importantly that we implement a whole-of-society approach, not a whole-of-government approach. A whole-of-government approach by the Federal Government has failed. We want to do a whole-of-society approach in which we must get support from all the people. I am confident, I believe, I am certain, if there is sincerity in this matter. Not only the State Government and the Federal Government but also the parties are ready to set aside political differences so that we can win against COVID-19. Only when we are together, only when we hand it over to experts, only when we ensure money reaches the people and those who need it, including engaging contract doctors, will they support us in fighting COVID-19. Only then can we win against COVID-19. Thank you.

Speaker (Speaker)EN

Thank you, Air Putih. I would like to seek the floor, Bayan Lepas.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, Dato' Speaker.

Speaker (Speaker)EN

Watch the debate time.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

I may not be long, 10 minutes. Because I want to give 10 minutes to a fellow member so that they can join in.

Speaker (Speaker)

Sila.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Bismillahirrahmanirrahim Alhamdulillahi Rabbil 'Alamin Wassalatu. Wassalamu 'Ala-Asyarafil Anbiya'e Wal. Mursalin Saidina Muhammadin Wa'ala Alihi. Wasahbihi Ajma'in. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Before I begin this speech, let us express our sympathy to the families of those who have passed away due to COVID-19 infection, which has occurred for almost two (2) years. To those who have fought and are fighting this COVID-19 virus, let us pray that they are granted recovery, given strength and fortitude, InsyaAllah, we are with them in obtaining the recovery they deserve and in resuming life as before.

Firstly, it is not too late for me to wish everyone a happy 64th Independence Day. The independence we have enjoyed for so long was won through the hard struggle of freedom fighters, whether from among the nobility, the religious scholars, the Malay warriors or ordinary people armed with the keris or with ideals, with the spirit to drive the colonists from the soil of Malaya. There were also the sacrifices after the cry of Merdeka, endured by national heroes who donned uniforms to defend independence until now, for the sovereignty of our beloved land of Malaysia.

Dato' Speaker, in 2018 the landscape of national administration changed face. The 60 years of rule by Barisan Nasional was rejected by the people in favour of a new change, with great hope of choosing Pakatan Harapan as the pillar of national administration. Just as the COVID-19 virus was spreading from China to other countries, the Pakatan Harapan government fell due to defections. At that time, we were all unaware that the Coronavirus was a new calamity that had emerged and would strike the whole world, and until now our country has still not finished fighting this killer virus. A virus that kills human lives, that destroys lives which had previously been built up, people who lost their jobs, some who lost their children, lost their husbands and wives, parents and loved ones. Let us unite at all levels to tackle this outbreak. If in this honourable House matters of responsibility of certain parties are touched upon, criticised or ideas for solutions are proposed, that does not mean belittling their hard efforts, but rather it is for improvement seen from a different perspective, and of course related to the complaints and anxieties of the people.

Dato' Speaker, the COVID-19 deaths in Penang, a state with a fairly small population of around 1.7 million. The number of deaths recorded yesterday reached 603 people. How many more will become victims of this COVID-19? Dato' Speaker, "quarantine yourself or die alone" is what has been on my mind and the minds of most people when the implementation of home quarantine is attempted. Whatever method of COVID-19 monitoring is adopted, assessment centres or CAC or the like, take daily reports from patients, but in my view it is not a conclusive solution. Dato' Speaker, we all know that this virus spreads quickly and easily, moreover other mutations such as Delta, Alpha and others have emerged. How is it possible to carry out self-isolation in the homes of patients that only have two (2) rooms or one (1) bathroom... (interruption).

Lee Chun KitDAP · PHPulau TikusEN

Excuse me for a moment. Okay, just a little, not long. I just want to say that today I lost a school friend due to COVID-19. So, I appeal to the federal representatives present in this House too, to please take this case seriously, take this issue seriously, because we have, we are really already fed up, to the point where we cannot have any feelings left, we have reached that level.

Speaker (Speaker)EN

Thank you, Pulau Tikus.

Lee Chun KitDAP · PHPulau Tikus

So, saya minta.

Speaker (Speaker)EN

It's good that we have Members of Parliament too, it's all right.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

That's right, Pulau Tikus. Therefore, for me to implement this home quarantine order for houses of only up to 500 square feet, or those of 700 to 750 square feet, except for those living in condominiums or landed houses. But most people in Bayan Lepas are M40 or the majority are B40 living in flats of the RMM Category A or B. Dato' Speaker, when these patients are only instructed to self-isolate, the percentage of transmission to all household members is very high, which is what is happening now. As close contacts in the manufacturing sector, while waiting for swab test results, they have infected their households. We also need to look at the fairly high number of deaths outside hospitals, namely what is called BID, brought in dead, as if these people died without receiving treatment. However, we as representatives of the people or residents in the State of Penang, I myself do not know how many BID cases have occurred. What we know is only the overall figures in our country that are reported in the media. Dato' Speaker... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Speaker, may I interject? Just a moment. Dato' Speaker, I also want to refer to the information or answer from the EXCO yesterday which stated that only one out of 7,000 or 4,000 people who were quarantined at home in Penang died, only one. This is perhaps the best record in the whole country, in Penang, Dato' Speaker. Because yesterday the Health Minister in his first press conference stated that one (1) out of five (5) deaths came from home quarantine cases, that's 20%. How is it possible Penang's number is so low? We want this information shared with the whole country.

Speaker (Speaker)

Thank you, terima kasih.

Satees A/L MuniandyDAP · PHBagan DalamEN

So that other countries too, other states too would only have one death. I ask that if this record is not correct, it be corrected, Dato' Speaker.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

That record is certainly not correct, Dato' Speaker. Dato' Speaker, to win this battle, the government agencies concerned, especially the MOH (KKM), must realise that it is like a football match in which we must get ahead of our opponents, we must be faster and stronger than the opposing side to score goals. We are also like in a real battlefield, using all the weapons and soldiers available. We cannot give excuses like "oh we lack staff, we lack assets". How is it possible to fight in Penang with a strength roughly the same as last year, when COVID-19 cases rarely reached hundreds but now have reached thousands a day. On 6 September 2020 the cumulative number of cases was only 137 cases in Penang, and the number of deaths was 2 cases. Within a period of one year, the difference is too high.

The people do not want and should not be burdened with communication problems or problems of the right to receive treatment on the excuse of "oh, there are many cases". Calling the operations room is quite difficult to get a response because they are busy with many cases. "Oh, the quarantine centre at PULAZA is closed." "Oh, stage one, oh, stage two," and various other excuses that the people have faced. Dato' Speaker, if patients with symptoms of stage one or stage two are categorised as not being in an urgent situation, they do not need to undergo a swab test, they are only given Panadol and cough medicine and sent home to quarantine themselves. What will happen to their family members? Is that not like the hospital or the clinic allowing a killing poison to be taken home and given as a gift to that family? Imagine what will happen to that family which has members of various ages and various levels of health. Does that not mean the failure of the current health system? Dato' Speaker, I am also puzzled why, during the burial of COVID-19 victims, everyone who handles it wears PPE, when the body has already been properly handled, wrapped in white plastic, with limited handling, and it is impossible that those who have died, the virus would have a greater impact than the virus living in the homes of those quarantined. That is what I mean. Why do we need to be so serious about handling bodies with PPE and so on, when the body has already been properly handled with sanitation and so on, yet in our homes we are only asked to wear a face mask, wash after using the toilet, wash after using items. If that is the situation in handling bodies, then likewise in the home for managing patients who are positive for COVID-19. Dato' Speaker, I also support the proposal made by KOMTAR yesterday, due to the widespread spread of the Delta virus, to implement a lockdown with conditions. The condition is that we are prepared to ensure that around 1.7 million of our people are fully screened. There is no point in implementing a lockdown merely to shut down economic and social activities as we did before, but at the same time the people are still not fully screened. There is no meaning in a lockdown if it is done in this way; it is not a solution. Dato' Speaker, our elders often say that time is like a sword, if one is slow to act, many lives will be lost. This matter needs to be looked at: the time to get each swab test and the waiting period to get a swab test should be shortened. There are cases with symptoms of COVID-19 infection who now cannot go directly to the clinic. When they arrive at the clinic, "oh sir, your name is not on the swab test list." Oh, this is what happens, which we often receive complaints about, right, friends, Honourable Members? That is what happens on the ground. For me, to curb COVID-19, we must use time efficiently. Prevention is better than cure, detection and isolation are better, and are very important, as we did during the first MCO last year. I also appeal to open up the space for the staff of the State Health Department (JKN) Penang to be increased, to recruit support staff as contract workers to assist these frontliners in facing this battle. If those working in the MOH (KKM) now have sincerely carried out their responsibilities, and some, I think, have performed tasks beyond their responsibilities such as handling bodies and digging graves, I truly, truly pity them. I am also, in this honourable House, expressing my heartfelt thanks to all frontliners, especially those working under the MOH (KKM).

Dato' Speaker, I also welcome the media statement issued by the Health Minister late yesterday afternoon, stating that he will mobilise MOH (KKM) staff and machinery from states that have fewer problems or have already been controlled. He stated that he will focus on four (4) states, including Penang, and besides that Kedah, Johor and Sabah. I also hope that the new Health Minister can be proactive and implement drastic changes to protect the lives of Malaysians. May the efforts of the frontliners who risk their own lives for others be counted as great charity. May Allah multiply their good deeds. To those who have lost loved ones, I offer my condolences, and to those who are struggling and fighting COVID-19, may they be granted recovery and strength, and may Malaysians always pray for you. Dato' Speaker, to make the state and nation civilised, advanced and productive, education also needs to be looked at seriously. How do we ensure our children continue to acquire knowledge during the COVID-19 pandemic? What worries me greatly is young children aged 5, 6, 7 years who are still seeking knowledge to read and count fluently. For now, what I see is the government's focus on those facing examinations. I fear these young children will fall far behind because they cannot learn properly at that young age... (interruption).

Speaker (Speaker)EN

Honourable Member. It is more than 15 minutes. Please summarise. If possible.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Home-Based Teaching and Learning (PdPR) is not a suitable learning method, especially for those at pre-school level who need more attention. Teaching them with various approaches to encourage their interest in learning is of course a different approach from that for teenagers and older children. The role of parents is very important. As time is very short, I will go straight to my point regarding my constituency. Dato' Speaker, recently, on 18 August, my constituency, Teluk Kumbar, experienced a very severe flash flood which affected 250 houses of residents. I thank Dato' TKM I, who kindly came down to visit the area, and I also very much hope that these people will be given support during the COVID-19 pandemic that is happening now. They are in hardship, and I hope there will be some assistance from the State Government to ease their burden.

Speaker (Speaker)

YB.?

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Mr Speaker, I have just a little more. Mr Speaker, the most important point I need to state here is the proposal to build a workers' hostel in the DUN Bayan Lepas. I do not fail to understand the policy that the Honourable EXCO member just now conveyed. We support that policy, but at the same time, Mr Speaker and fellow State Assemblymen, imagine that within a 5-kilometre radius there are 3 proposals to build workers' hostels or foreign workers' hostels. The first is the Zaterlight Project, for 25,000 people, in the settlement area of village folk. Chinese, Indians and Malays who have lived in harmony and peace, and now comes another proposal to build 8,700 units at Bukit Belah. And most distressing, I have also come across another proposed foreign workers' hostel project right in the social area where the public conducts its business, namely at Taman Perda, Teluk Kumbar, which is expected to house 6,000 people. Imagine, ladies and gentlemen, fellow members, if within a 5-kilometre radius there are 40,000 foreign nationals, when my own voters are only 23,000 original residents, and there are only 20,000, we will become a minority. So I humbly ask that the State Government give this careful consideration. I am not preventing the construction of the hostel.

Speaker (Speaker)EN

Are you giving way, or are you going to wrap up completely?

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

I ask the State Government to consider that this Social Impact Assessment (SIA) must refer to the people's representatives. It must refer to the community, and not be prepared by paid consultants, who will certainly be biased towards the project. I ask that the residents not become a minority in that area. Please proceed.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

Thank you. Bayan Lepas. I agree with what was conveyed by Bayan Lepas. That is why, in the MPSP Council earlier, my proposal at that time was that this construction be built on industrial land; enquire about the empty land available. Those houses, the workers' houses, should be built on an industrial site, in Batu Kawan, not in a settlement. However, I do not know whether Bayan Lepas has noticed or not, but if this matter can be considered, I ask that the State Government carry out the construction on the industrial site itself. In the free trade zone areas, if there is still empty land, although I know it is company land or land that has to be enquired about, build within that. It will not mix with the majority of the local residents in that area. Thank you.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Finally, I strongly agree with the views of Sungai Acheh, and I also agree with the views of the Honourable EXCO member just now. Build far away, away from the original settlement. If you want to do it properly, wait until the 3 islands are finished, and no one will have to give orders. The present problem is, okay, you all want to build a gated area, so to speak, okay, 40,000 people will be inside the gated area, they will not come out, it is impossible, humans will not come out of that, okay, last. And also the original residents will have to share, share the roads, share the hospitals, share the clinics, share the rivers and everything, which will trouble the local residents. So I ask that this matter be given full attention. I hope this implementation can be cancelled, or at the very least minimised. Walhuallam, thank you, Mr Speaker. Thank you, and I hope the people of Malaysia can get out of this COVID-19 disaster. Wallahuallam.

Speaker (Speaker)EN

Thank you, Bayan Lepas. I want to give the floor to Penaga. Please also keep to the debate time. Earlier, Bayan Lepas also spoke for more than 20 minutes. We will close at 1.00 for the EXCO members, who please be prepared to deliver the winding-up speeches, which must also be time-limited to 20 minutes. Issues that do not touch on portfolios need not be raised in the winding-up. I remind the EXCO. Please, Penaga.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Assalamualaikum Warahmatullahi Wabarakatuh and peace be upon you. Alhamdulillahirabbilalamin, Wassalatu Wassalamuala Rasulillahashabihiajmain. Thank you to Mr Speaker, the Honourable Chief Minister of Penang, all the EXCO members and Executive Council members of the State Government, the Honourable Leader of the Opposition, and then to my friends, Honourable Members, and dear ladies and gentlemen. Thank you for giving Penaga the opportunity to deliver a debate speech on the motion. Thank you for the speech of His Excellency Tun Ahmad Fuzi bin Abdul Razak, Yang di-Pertua Negeri of Penang, for the First Meeting of the Fourth Session of the Fourteenth Penang State Legislative Assembly. In that speech, all aspects were given focus and touched upon, involving the issues of the pandemic, health, the economy, development, entrepreneurs, industry, the empowerment of the community, and Islamic Religious Affairs. Also among those touched upon by Tun were human capital, youth and sports. Penaga begins the speech this morning with two (2) issues in Penaga itself. The first relates to the problem of internet access in teaching and learning in the new normal. Online teaching and learning has become the new normal for educational institutions in Malaysia, the effect of the COVID-19 pandemic for more than a year now. Online teaching and learning will only be effective if internet access can be enjoyed widely, not only in the towns but also in rural and remote areas. The problem of internet access is one of the problems said to be critical in Penaga, because Penaga is an area in the north bordering Kedah, a fishing area, a paddy field area. Many areas and villages have no internet access, causing the teaching and learning process to be disrupted. Among them are Kampung Lembah, Taman Penaga Permai, and several other areas. Some students have nearly failed university tests because of weak internet connections that suddenly cut off. They also have to travel far out of the village in order to follow online learning smoothly. So perhaps the Honourable Tanjong Bunga can give attention to this. Also, several applications for internet access have long been submitted to TM. Therefore, it is hoped that the efforts of the telecommunications party just now, in the answers given by the Honourable State Assemblyman, who mentioned that nine (9) communications companies have cooperated with the State Government, will be that those companies also focus on or look at the problems in Penaga. Therefore, it is hoped that the communications parties will make efforts to ensure that action is taken immediately to improve internet access in Penaga and other DUNs, as well as work from home and PdPR. The second issue in Penaga concerns the need for three (3) toilet units at the Penaga health clinic... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Honourable Penaga. Excuse me, pass through. Just a moment. Just a moment. The same issue about PdPR, about online learning, is not only for Penaga. I am speaking for all the people of Penang who have children still studying. But I want to ask, what is Penaga's opinion? We have a Minister of Education who should already have distributed 150,000 laptops, which have still not been fully distributed to those affected, and we also have a Prime Minister who recently reappointed the Minister of Education, who has clearly failed to help these people. I want to ask Penaga's opinion.

Speaker (Speaker)EN

Penaga, let it be asked in Parliament. No need to answer. Later we will raise it up to Parliament.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Bagan Dalam may ask the Member of Parliament.

Speaker (Speaker)EN

Enough, Penaga. Later I will cut your time.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Mr Speaker, I continue with the need for three (3) toilet units at the Penaga health clinic. The expansion of the COVID-19 screening area at the Penaga health clinic has created a need for toilet facilities for patients treated under the tent, located outside the main premises building. I have been down and seen that the outside toilet facilities are to prevent patients with fever symptoms and COVID-19 symptoms from entering the toilets inside the premises of the Penaga Health Clinic. The absence of outside toilet facilities has caused congestion and sharing among patients; therefore, additional toilet facilities are needed outside the main premises of the Penaga clinic. I ask for the attention of the Honourable Penanti in this regard. Mr Speaker, I also want to take this opportunity to express my immeasurable thanks to all the frontliners who have sacrificed greatly during this COVID-19 season. I call on all, especially my fellow Honourable Members, to help them greatly. Give support, feeling deeply what they are going through. I am also directly involved, and last month, 4 August, I, together with members of the Amal Malaysia Department of Penang State, had the opportunity to assist the District Health Office not only in the SPU district but now expanding to the SPT and SPS districts, to help them with the management of Muslim burials across Seberang Perai. With the number of deaths being unpredictable every day, as mentioned by the Honourable Air Putih, the high number of deaths, the unpredictable number of deaths each day means that the Amal members must be ready at all times to assist the district office, and are also helped by the Civil Defence Force (APM) to manage the bodies of Muslim COVID-19 patients. Exhaustion, the heat, and the difficulty of management, we have felt together. This year is full of challenges; the nation's frontliners have sacrificed greatly. Let everyone raise their determination, and do not forget prayer, because of COVID-19 the world is anxious, lives and livelihoods are at stake, it is not the time for us to be divided. Merdeka, pandemic, sejahtera, watan. Mr Speaker, I also want to touch on the issue of homelessness. The Mutiara Foodbank Programme is greatly praised and should be enhanced, at the very least to help the people in the era of the COVID-19 pandemic. What I want to tell Mr Speaker is that the State Government should provide temporary accommodation for the homeless during a pandemic, and not just fold its arms. Initiatives such as cooperating with NGOs to help the homeless must be implemented, but unfortunately there is no effort, and even advice has been given not to provide food aid because they are not homeless. Many aid providers risk being fined RM10,000 for giving food to the homeless. The question is, if the State Government succeeds in controlling and at the same time reducing homelessness to a minimum level, will the people or food aid providers still exist? Therefore, the State Government must be more proactive, considering that the number of homeless or food aid recipients is estimated at 500 people at locations such as

KOMTAR, Teatell, Chinese temples, roadsides, Masjid Kapitan, Padang Tembak, and also in Butterworth and other places. This does not include the Child Welfare Centres, persons with disabilities, and old folks' homes, who have to ask for food aid because they cannot bear the costs and burdens during the COVID-19 pandemic. Food aid alone is not a solution; the State Government must implement a long-term plan to resolve the homelessness issue, and not just announce that Penang is poverty-free. Anyway, thank you for the initiatives taken by the State Government to help, especially the concern of YAB. Chief Minister. So I will give a pantun:

Thank you, State Government, for helping the people Get through hardship with the concern of YAB. Chief Minister of Penang Keep advancing, and sustainable.

Mr Speaker, I also want to touch on an issue that was brought to me, namely the housing issue at Taman Terubong Indah. I want to get certainty from the State Government, especially the Honourable Datok Keramat, whether it is true, and I request an explanation from the EXCO members involved, as they have complained of disappointment regarding the injustice in the house purchase issue. 93 citizens bought the houses in 1995 at a price of RM84,000 from the developer Majestic Heights, namely Taman Terubong Indah, Paya Terubong, Ayer Itam, Penang. The developer Majestic Heights built 80% of the Taman Terubong Indah apartments and abandoned 20% in 1997. Then in 2014, the developer PLB Sdn. Bhd. took over this project and completed the remaining 20% after obtaining approval from the OSC City Council. The apartments were completed and keys handed over in 2016, when the Honourable Air Putih was Chief Minister. For the information of Mr Speaker, the buyers of these 93 houses are still claiming their housing rights until now and have several times requested assistance from the State Government. Some of them have fully paid off their bank loans for the houses, some are still paying, and a few have been declared bankrupt by the bank. They demand justice, because hundreds of thousands have been spent, but the shadow of a house is still not visible. I request an explanation from the EXCO involved during the winding-up later, Insya-Allah. Mr Speaker, my stance is also the same as the Fishermen's Association on the PSR issue: we remain the same, we stand with the Fishermen's Association, the Fishermen's Unit, and fishermen who reject the PSR because the EIA, FIA, MTFN and ANP reports say the environmental damage would be permanent. Only the Honourable Bayan Lepas agreed with the PSR, his concern being that housing projects or hostels for foreign workers would affect voters there. I feel the impact of the PSR is higher. The State Government must listen to the fishermen's objections to the approval of the EIA by the Director-General of the Department of Environment, decided by the panel of the Environmental Appeal Board from 6 to 9 September 2021. Mr Speaker, in the speech of TYT it was also mentioned that the project involving an area of 96.46 acres in the Sri Tanjung Pinang Phase 2 (STP 2) reclamation project, near Gurney Drive, North-East District, Penang, is ongoing and continuing... (interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Clarification, Honourable Penaga, with your permission. One interesting issue about this PSR is that, because today we are facing a pandemic, and after we achieve herd immunity, we will enter a new normal life called endemic, which means we must live with COVID-19. Our great test is facing this COVID-19 pandemic, which is not only a health crisis and a crisis of lives, but also an economic crisis. So regarding this PSR, does the Honourable Penaga agree that the PSR project is a project to create job creation (with permission), namely a project that can create more employment opportunities for the people of Penang, and at the same time we must balance the soundness of this project with the concerns of the fishermen mentioned by Penaga just now? However, does Penaga realise that a series of discussions with the Penang State Government has produced several solutions between the State Government and the fishermen, including several livelihood assistance packages: ex-gratia aid, boat aid and engine aid, a jetty empowerment package, and affordable housing for the fishermen? So my question is, can Penaga agree that, in facing the life test of this pandemic where the economic recovery plan strategy is so very important today, and with the solutions made by the Penang State Government enabling this PSR project to continue? I ask for an explanation from the Honourable Penaga.

Lee Chun KitDAP · PHPulau TikusEN

I also ask the Honourable Penaga for further clarification. I would like to ask the Honourable Penaga what the alternative plan is to revive the economy after this pandemic, because we have seen that this pandemic threatens the whole world, and we can see the whole world is struggling, and at this time the employment problem will all arise. What is the alternative plan from the Honourable Penaga and his party, PAS, because we do not want to use one state like Kelantan as an example for the people of Penang to follow. Thank you.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

All right, thank you to the Honourable Permatang Pasir and also the Honourable Pulau Tikus. Regarding the views of the Honourable Permatang Pasir on the PSR issue, I certainly do not agree. Not only does the PSR give employment opportunities, but I see that the opportunity for destruction is greater, to the ecosystem and also to the places or resources from which fishermen obtain their catch, their livelihood could be destroyed. That is why we are firm on this PSR issue. The State Government should also listen to the complaints and concerns of NGOs and fishermen's associations in the surrounding areas concerned. Just as we are also worried about our neighbouring state... (interruption).

Lee Chun KitDAP · PHPulau TikusEN

Honourable Penaga, but I do not see that PAS has met with NGOs at all, when according to the logging system in their state, they are in power.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Surely we are not going to report every single thing we do, every meeting we hold... (interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

I am interested in the Honourable Member for Pulau Tikus from the PAS party. I recall that one or two months ago, a former Deputy Minister of Agriculture, a PAS Member of Parliament, came to Pulau Pinang without referring to the Penang State Government, did not obtain a clear explanation from the Penang State Government, and criticised this PSR project, allegedly claiming it was an action of the Penang State Government to drive out the Malays of Penang. This is an action that should not have happened, because firstly, it did not obtain clear facts about the position of this project, and secondly, it played with racial sentiment, making this sentiment a tool or political opium for the purpose of political interests, whereas we should be more honest and look to the interests of all the people in making any comment. So I request an explanation from the Honourable Member for Penaga on the reasonableness of the statement made by the former Deputy Minister, made in a situation where our state is facing the challenge of this pandemic, especially in the Economic Recovery Plan, thank you.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Thank you, the Honourable Member for Permatang Pasir. It seems this issue is rather heated. I have already spoken at length about the PSR issue in the previous sitting of the House. I do not intend to prolong it, but it is not just one or two who objected, not just the Deputy Minister. Many NGOs, agencies, and indeed everyone, including the Member of Parliament for Permatang Pauh, also questioned this PSR project. It was even put on the Permatang Pauh Member of Parliament's page, so you may refer to that page, if the issue raised has not been deleted. So in this matter, it is not a racial issue, because the NGOs that objected are not of only one race but involve various races, so we respect that. Take the project in Kedah, for example, our neighbouring country's Kulim International Airport project, where we are also worried it could affect the water of the Muda River, let alone this project in our own state, Penang itself. So Deputy Speaker of the State Legislative Assembly, I shall continue...(interruption).

Lee Chun KitDAP · PHPulau TikusEN

But PAS is now in the Federal Government, why can't they discuss with their own party leaders?

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Honourable Member for Penaga, may I interject. Honourable Member, I too am interested as everyone discusses this PSR matter, because I myself may have a slightly different view from the Honourable Member for Penaga. But what is more complicated is when I see the State Government itself, as if there is no agreement among their own parties. I don't know, perhaps the Honourable Member for Pinang Tunggal, I understand, has taken over my responsibility to resolve the problem with the fishermen, but the information I received from the retreat of the leadership of the Honourable Member for Pinang Tunggal, his own party is understood to be, the President questioned why they still want to carry out PSR, perhaps that is why the Member of Parliament raised this matter...(interruption).

Satees A/L MuniandyDAP · PHBagan Dalam

Point of Order, point of order.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

...because we all know, Honourable Member for Penaga...(interruption) the Member of Parliament for Permatang Pauh openly opposed the efforts made by the State Government. So is there a crisis there that I do not know about? Because nowadays there are many misalignments, so I am not sure how it is in the State Government. Does the Honourable Member for Pinang Tunggal represent the State Government, or represent the Party, or how? Permatang Pauh's view is very different, and it has even openly expressed objections repeatedly on this PSR issue. So if earlier we wanted to question other states, Pulau Tikus wanted to question, Bagan Dalam wanted to question, Permatang Pasir wanted to question Penaga, I think it is better to question our own government first. Ask what is the actual stand of this political party....(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

This is an accusation, an evil intention. He said as if there is a conflict within this State Government, which is not true. This is merely said as speculation. He wants to heat up the House. He states statements...(interruption from several Members) [YB. Deputy Speaker switched off the microphone]

Deputy Speaker of the HouseEN

Honourable Member for Penaga, continue, Penaga continue....(interruption). Bagan Dalam, please sit down. I have not given the opportunity to anyone. I ask Penaga to continue. Penaga continue, Penaga.

Bagan Dalam, please sit down. Pulau Tikus, please sit down.

Lee Chun KitDAP · PHPulau TikusEN

I want to speak. Interject. Just a little interjection. I ask only for a brief interjection. Just a little. Honourable Members, every individual certainly has their own opinion and their own differences, but the most important thing is that we work as one team, not as a coalition that persecutes each other until a government has even collapsed. Can you see that?

Phee Boon PohDAP · PHSungai PuyuEN

Dato' Speaker, I have only one question here that I want to ask. The Honourable Member from Seberang Jaya, what is the Honourable Member's stand at this time regarding PSR? What is the stand?

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I am proud when the State Government EXCO asks for my stand. Thank you, my friend from Sungai Puyu. Can you answer a little, Penaga? Just a little. This is Penaga's floor. I have already said earlier, my view is indeed slightly different from Penaga's, and we cannot deny it. I'm not going to lie to the Dewan. I myself was involved in efforts to ensure that PSR could proceed, and indeed a large part of what was mentioned in the speech of the new TYT. Those programmes were proposals from me earlier to be brought for consideration by the State Government. I am part of the State Government. I know the project, but the question we are raising was raised by another state. PAS over there, PAS here. Let's settle here. We're in this Dewan to discuss about our state. To discuss about Penang. That's why I think we have to be fair. To the Honourable Member for Penaga, my view...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

So Seberang Jaya wants to join PAS, is it?

Phee Boon PohDAP · PHSungai PuyuEN

But Federal says Seberang Jaya with....(interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Agreed. I agree.

Deputy Speaker of the HouseEN

Okay, sit down. Sit down. Penaga continue. Penaga continue.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I think the Honourable Member for Pinang Tunggal also agrees. His question now is why we raised that Permatang Pauh does not agree...(interruption).

Deputy Speaker of the HouseEN

Ask Seberang Jaya to cut short. Ask Seberang Jaya to sit down...

Satees A/L MuniandyDAP · PHBagan DalamEN

Permatang Pauh is not a State Legislative Assembly member. That is his individual view.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Honourable Member for Bagan Dalam, all right, I will continue the speech of Dato' Deputy Speaker since time does not permit. Among the many matters touched upon by TYT in the opening speech of the House, I only see that there is one big project not touched upon, which relates to the Undersea Tunnel Project. So I am not sure, I want to know what the development of that project is, whether it exists or when it will be implemented, or whether this undersea tunnel project is still under investigation by the SPRM. Mr Speaker, on 1 September 2021 a history was recorded when all the Members in this honourable House, we succeeded in passing the amendment to the Bill for the Enakmen Perlembagaan Negeri Pulau Pinang to lower the age limit from 21 years to 18 years and above, to enable them not only to be voters but also to be nominated as candidates in general elections. I see this matter is also in line with Islam, when Islam places a person as able to manage, or handle matters involving their own interests, when they reach the limit termed akhil baligh, and akhil baligh in Islam for males is roughly around the age of 15 years. 15 years, earlier, because we see that there are times when these individuals have the potential to build the nation together. Indeed, in Islamic history we can see how the Prophet Muhammad SAW himself, two (2) months before his death in the eleventh year of Hijrah, appointed a very young companion, namely Usamah Bin Zaid. Zaid Bin Harithah was the adopted son of Rasulullah SAW, whose father was martyred at the Battle of Mu'tah, but his son Usamah Bin Zaid was appointed by the Prophet SAW to lead a unit of the Islamic army at the age of 18. And if we look at history afterwards, when Sultan Muhammad Al-Fateh succeeded his father, Khalifah Sultan Murrad of the Ottoman Empire, Sultan Muhammad Al-Fateh was appointed as caliph at the age of 18, and at the age of 21 Sultan Muhammad Al-Fateh succeeded in realising what had been stated by Rasulullah SAW, that Islam would open the City of Constantinople, and finally we see Istanbul, the city opened by Sultan Muhammad Al-Fateh when he was 21 years old. However, we must see that the Federal Government and also the State Government need to play a role in how we provide education to teenagers or youths aged 18 so that they are politically mature and can also together build our nation. We do not want those grandfathers' cultures to be followed or obeyed. They must be mature in acting so that, insha-Allah, if any of them are later nominated in the upcoming general election and entrusted to lead at state or national level, they can carry out that trust as well as possible. So this is what we need to look at. The Federal Government and also the State Government, the education module for these teenagers or youths, insha-Allah, so that in their hands later we hand over the mandate for them to continue driving the development of our beloved Malaysia, insha-Allah. Dato' Speaker, I end my speech with a pantun:

Come on, all Malaysians, Let us fly our Jalur Gemilang high, All races united in heart, Bringing the nation towards success.

With that, thank you, I support.

Deputy Speaker of the HouseEN

Thank you, Penaga. Next, Bertam. 15 minutes only.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Dato' Speaker, it's been a long time, Dato' Speaker. May I?

Deputy Speaker of the HouseEN

15 minutes only.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Assalamualaikum WBT, peace and greetings of independence to all Honourable Members. Bismillahirahmanirahim, praise and thanks to the Almighty God, for by His abundant blessings and grace we are all able to gather and sit in this esteemed House, even though we are still in a pandemic that worries the whole world, COVID-19. Alhamdulillah, the seats of the Honourable Members have also been arranged so well, with optimum social distancing to safeguard everyone's safety. Bertam once again presents itself at the First Meeting of the Fourth Session of the 14th State Legislative Assembly (DUN). In this esteemed House, which has been refurbished for the comfort of all Honourable Members.

Bertam thanks His Excellency the Yang di-Pertua Negeri of Penang for officiating at this sitting of the Penang State Legislative Assembly. Although we sit in this House that has been refurbished, Bertam hopes, in line with the suggestion of His Excellency the Yang di-Pertua Negeri of Penang, that a new State Legislative Assembly building can be erected in the near future to provide comfort and smooth running for upcoming sittings, taking into account the number of Honourable Members, officers and staff of the State Legislative Assembly.

Dato' Yang di-Pertua and Honourable Members, first of all Bertam wishes to extend millions of thanks to the leadership of the Penang State Government, which distributed COVID-19 aid funds, and these funds were used as best as possible to redistribute food basket aid to those affected by this pandemic.

Throughout the COVID-19 pandemic that has struck the nation, especially during the implementation of the Movement Control Order, or PKP for short, the public has been greatly affected in terms of loss of income sources, emotions and mental health. Those affected are not only those quarantined due to infection, but also families affected by being unable to work, unable to trade, losing sources of income and so on. Daily cases in Penang have also become increasingly worrying from day to day, and in Bertam too cases are high, but the steadfastness, resilience and spirit of frontline workers are extremely high. The same goes for the volunteers, or the Skuad Prihatin, who help implement the food basket programme.

Dato' Yang di-Pertua and Honourable Members, Bertam wishes to extend millions of thanks without measure to all frontliners and also the volunteers who have helped the government in carrying out the work of assisting the people. They have toiled to ensure that all citizens comply with the SOPs, regardless of day or night, hot or rain, to ensure COVID-19 can be contained. They also have had to face tense moments, especially the officers at quarantine centres, hospitals and so on. They are often exposed to infection, but with their high determination and commitment they remain at their assigned posts without any complaint.

Dato' Yang di-Pertua and Honourable Members, throughout the PKP 3.0 period, Bertam has succeeded in distributing food basket aid to more than 3,000 affected families. Thanks are conveyed to all officers, staff, members of the Bersatu Branch Division Committee, and friends who have contributed energy to the distribution of these food baskets. Bertam also wishes to extend millions of thanks to the Federal Government through the Department of Social Welfare, which also distributed caring baskets, as well as private companies and individuals involved in the distribution of these food baskets.

Without the involvement of the State Government, the Federal Government, private companies, government agencies and caring individuals, it would be quite difficult for Bertam to channel aid to those affected. At the same time, additional aid has also been channelled to families who are still less well-off in order to continue their lives.

Dato' Yang di-Pertua and Honourable Members, given that Bertam does not have an administrative wing such as MPKK, Bertam has channelled aid through the Khariah of mosques around the DUN. Mosque and surau committee members have also been the eyes and ears for Bertam in knowing the number of families involved and affected in each area. Data from the Department of Social Welfare as well as the Penang Zakat Management Centre have also been used as references in carrying out this mission.

Cooperation among the surrounding community has also greatly helped, regardless of political affiliation, race or religion. As the saying goes, 'Jiran Sepakat Membawa Berkat, Yang Berat Sama Dipikul Yang Ringan Sama Dijinjing', that is the greatness of the community around the Bertam DUN.

Dato' Yang di-Pertua and Honourable Members, the National COVID-19 Immunisation Programme, or PICK for short, is being implemented successfully with the cooperation of the Federal Government and the Penang State Government. Although at the beginning of this programme it was considered impossible to administer vaccine injections up to 50,000 people a day, the number of vaccinations has now increased to the point where it once reached 500,000 vaccine doses a day.

Bertam itself visited the Vaccination Centre at Dewan Millenium on 28 May 2021, and at that time the number of vaccinations was only 600 to 700 people a day. However, on the next visit, on 18 June 2021, the number of vaccinations had doubled. Now, with the existence of the Vaccine Administration Centre at Dewan Millenium and at the Perda Convention Centre, the number of vaccinations per day at each centre can reach up to 1,500 people, and this can further accelerate the vaccine administration process at these two centres.

Bertam wishes to extend congratulations and kudos to all staff of the Vaccine Administration Centres in Penang and across the whole country. Also congratulations to the Ministry of Health Malaysia (KKM), as well as the State Health Office and district health offices in the State of Penang, for their hard work without regard to time limits.

Dato' Yang di-Pertua and Honourable Members, the COVID-19 pandemic has caused the country's economic sector to be severely affected. Some companies have had to close operations, and this has resulted in workers being laid off and unemployment rising. Not only that, within this economic sector many small and medium entrepreneurs have also been affected. The Prihatin Rakyat Aid implemented by the Federal Government and the Small Entrepreneur Aid from the State Government have to some extent eased the burden borne by these entrepreneurs.

As all of us are well aware, many traders, whether restaurant operators, street hawkers or night market traders, have been severely affected. Although sales activities are permitted with compliance with SOPs and are allowed to be takeaway only, it still has not been able to increase their income. For night market traders or day market traders, they have had to look for other alternatives to continue their livelihoods.

Although in Phase 2 of the National Recovery Plan, dine-in is permitted (dengan izin) but on condition that customers must have two (2) doses of vaccine and that is only after a 14-day interval following the second dose injection. Most restaurant operators welcomed this suggestion, but the anxiety and lack of confidence among customers to dine in in air-conditioned and enclosed places have to some extent affected restaurant operators.

Bertam would like to recommend that the Local Authorities, the Penang Island City Council and also the Seberang Perai City Council consider whether these dine-in areas can be opened in open spaces near restaurants, such as in the areas of the Program Street Food. In Bertam, it is proposed that open spaces near Bertam Boulevard and the areas in front of kiosks, or shops and restaurants be allowed to place tables outside so that these dine-in activities can be carried out. And Bertam is ready to prepare a plan for the implementation of this. In Sha-Allah.

Deputy Speaker of the HouseEN

Bertam, 1 more minute.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Eh, really?

Deputy Speaker of the HouseEN

I've noted here what time you started, and what time you finish.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Okay, alright. 5 minutes?

Deputy Speaker of the HouseEN

No, no, five minutes. Only one minute.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Dato' Yang di-Pertua and Honourable Members, recognising that the COVID-19 pandemic has had an impact, causing financial decline and business performance deterioration for many small and medium entrepreneurs, therefore through the Penang Regional Development Authority (PERDA). An interest-free moratorium initiative has been given to tenants of PERDA premises, stall tenants, land and PPRT PERDA house tenants, borrowers of funds and also the PERDA Aid Scheme, starting from May 2021 until December 2021. Congratulations and kudos from Bertam to all PERDA staff and management. This incentive is in line with the public protection package and the economic recovery plan. This moratorium involves a financial implication for PERDA of almost RM2 million, and almost 700 tenants and borrowers have already received this benefit. Through the PERDA4U Free Ride Vaccine programme, free transport services to the Vaccine Administration Centres have been provided to target groups who need them. This programme is an initiative to help the government achieve the targets of the National COVID-19 Immunisation Programme optimally by increasing the number of vaccine recipients through free transport assistance.

Deputy Speaker of the House

Bertam, your time is over, you are consider finished already.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

I just want to also suggest, as Bertam mentioned earlier regarding the moratorium for traders under PERDA rental buildings. I also suggest, for the earlier reason, that the State Government has already given rental exemption assistance under the PBT involving council buildings. Perhaps for the latest one, although they can trade, if we look, they are affected because people cannot dine in and sometimes their income has indeed declined. Whether this proposal is considered, whether an exemption for a period or a half monthly payment to these PBT-owned buildings. Does Bertam agree with this proposal?

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

I agree. May I continue? Thank you. Easy. Dato' Yang di-Pertua and Honourable Members, this COVID-19 pandemic has given much awareness to all of us to unite in fighting this outbreak. The slogan 'Kita Jaga Kita' carries the meaning that we ourselves must become the barrier to break the chain of COVID-19. All of us need to ensure and comply with the standard operating procedures that have been determined by the National Security Council. Regardless of race, religion, age and status of life among us, everyone is obliged to comply with the SOPs. COVID-19 does not recognise Dato' Yang di-Pertua, does not recognise Honourable Members, nor ordinary citizens. If the SOPs are not complied with, the infection rate is extremely high.

In conclusion, it is Bertam's great hope that all Honourable Members can pool their energies, regardless of party, government or opposition, to help the people of Penang in times of hardship, anxiety and difficulty to continue their lives during this COVID-19 pandemic period. Bertam would like to appeal to all Malaysians in general and Penang in particular to continue to stand together to support the government's efforts to ensure the chain of COVID-19 is broken. Kita Jaga Kita, Insya-Allah, we will become a caring Malaysian family.

And at the last opportunity, Bertam also wishes to extend many thousands of thanks to Dato' Yang di-Pertua, Mr Speaker himself, for having rejected a motion that was raised earlier by Pinang Tunggal for the vacating of the Bertam, Seberang Jaya, Sungai Acheh and Teluk Bahang seats. And Bertam believes this motion is not appropriate to be raised at this time, given that a case is ongoing at a higher level. Thank you, Assalamualaikum.

Deputy Speaker of the HouseEN

Thank you, Bertam. Next, Batu Uban. The time given is only 15 minutes. Look at the time earlier, 12.52pm plus 15 is?

Kumaresan A/L AramugamPKR · PHBatu Uban

1.20pm?

Deputy Speaker of the HouseEN

Huh?! Please collect my SPM certificate for me tomorrow.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Thank you, Dato' Deputy Speaker, for giving me the opportunity to take part in the debate on the speech of the TYT Yang di-Pertua Negeri of Penang. I understand, Dato' Speaker, with the time constraints we face, I will abide by the Deputy Speaker's advice to expedite or limit my speech. Deputy Speaker, this sitting of the House has largely touched on matters concerning COVID-19, such as pandemic management, vaccination programmes, assistance to hawkers, the affected community and economic sectors, and also post-pandemic planning. We understand, my other colleagues, Honourable Members in this House are very concerned (dengan izinnya) about these COVID-19 issues, because we are worried just by the data or statistics on the number of community cases, as of yesterday, 1 September, there were 88,253 positive cases in Penang. Therefore, I feel that the authorities such as the KKM, the State Health Department (Jabatan Kesihatan Negeri, JKN) and the State Government need to urgently take strategic steps to ensure the spread of the COVID-19 outbreak can be cut off within the community.

As a people's representative, I also receive many calls from the local community in Batu Uban. The local community needs assistance when some of them test positive for COVID-19, but they are only asked to quarantine at home without any clear guidance. The elderly and the less well-off, all of these people may be left behind in receiving information through social media or effective communication. Therefore, I want to raise this issue in this esteemed House, so that effective communication can be carried out to help these groups. I would like to propose that the KKM or the State Government print a comprehensive leaflet on SOPs for self-quarantine patients. The ADUN's office, we as Honourable Members, can help to distribute them when we deliver assistance to patients in quarantine or positive patients who are quarantined at home.

In addition, I would also like to propose to the State Government that we help establish a system or support system application, for example in the app, we can place an SOS button, where when those quarantined at home face problems such as shortness of breath, oxygen dropping and so on, they can quickly press this SOS button and their information will reach the hospital, and the hospital can immediately send assistance directly based on the patient's GPS. We do not want, don't just ask for help in an emergency, ask these patients to call 999. Because we know, when these quarantined patients face problems, even if they want to call 999, I myself have tried calling 999 when helping one quarantined patient, many pieces of information were requested, much information had to be given by that patient, so all of this will hinder or delay the process of providing help to these patients. Therefore, I ask that we as the State Government, we must lead, we may be able to create an application, where that application can provide help so that those quarantined at home, when they need ambulance assistance and so on, they only need to press that SOS assistance, and immediate help will be provided. There are also patients who told me…(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Seeking clarification, Batu Uban. Thank you for the arguments raised by this Honourable Member for Batu Uban, particularly regarding the use of applications when we face the COVID-19 pandemic, and especially for those who have to undertake self-quarantine at their own homes. Actually, I think the homes assessment application has indeed been included in this MySejahtera system, but unfortunately we see that this system, which was developed with a very large budget of RM70 million that has been spent to develop the MySejahtera system, vaccine appointments from Penang, they can give even to Kota Kinabalu, Sabah. So, I think we should look at developing a suitable application so that we can channel assistance quickly to our friends who have to undergo quarantine at home, but we need to look at these detailed details so that we ensure the application really can function as we asked. Thank you.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Thank you, my friend from Pengkalan Kota. Yes, I agree, I strongly agree. We understand, and we cannot deny that the MySejahtera application also has many flaws. In my constituency of Batu Uban, some people have received appointments, in Seberang, at SPU, at SPT and so on. What about senior citizens or those who have no transport? They cannot afford to go there. Moreover, the cases in the Seberang area are also extremely high. So they are frightened. When they use the Help Desk available in MySejahtera, they cancel their appointments and so on to get new appointments, and it takes far too long, some up to two (2) to three (3) months, and they do not get a new appointment. Therefore, I hope the JKN can also help to resolve the issues raised by me and my friend from Pengkalan Kota. Dato' Deputy Speaker, there is also a patient who told me that when he called an ambulance, the hospital informed him that there are not enough ambulance services. So I would like to ask in this honourable House, is this true? If it is true, I feel that the KKM or the JKN should table a plan to overcome these matters. I believe the State Government and also the NGOs are ready to help, but they need the full cooperation of the agencies involved. I also request that the JKN in particular share information or data on positive COVID-19 cases with the Honourable Representatives of the People. We, as Representatives of the People, sometimes do not receive any information at all: how many people have tested positive, how many houses are under quarantine and so on. We do not have all this information. If in this honourable House, in written questions, the JKN can give a response, why is such a response not given from time to time to the people's representatives? Why do they not want to disclose this information? Because I feel this information is important, we as people's representatives need this data, need this information, so that we can deliver the proper assistance.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

May I interject. Batu Uban, yesterday the Minister of Health, in his press conference, stated that from now on, the Ministry of Health will do it transparently, meaning all details and all figures will be provided transparently. So I myself hope so. We hope so. Thank you.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Thank you, Bayan Lepas. That is right, we hope for cooperation. This matter is a disaster, a pandemic; we are facing a pandemic, so we need to be transparent in this matter and we need to share the information that we have. Dato' Deputy Speaker, I would like to touch on another matter. The COVID-19 matter has ended because many Members have already raised it... (interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Clarification, if permitted. On tackling this pandemic, just now Batu Uban touched on the lack of efficiency of the hotline and so on, and my question is, does the Honourable Member agree that the State Government needs to increase the number of field quarantine centres to ensure that the problem, the first being Brought in Dead, and also the problem of home quarantine without close monitoring by the KKM, is addressed? This is an efficient step to tackle the rising death problem among the people of Penang.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Yes, I strongly agree. 10 minutes more. I agree with that view, because from the beginning I have felt that many of my colleagues have given this idea that we should increase quarantine centres so that we can help. Dato' Deputy Speaker, I also want to obtain the latest status from the State Government regarding the proposal to build the first Tamil secondary school in Penang. The former Chief Minister of Penang, the Honourable Air Putih, at that time allocated a plot of land to build the first Tamil secondary school in this country, namely in Bagan Dalam. However, at that time Putrajaya rejected the proposal, so I recommend in this House that the State Government once again make an appeal to Putrajaya and then proceed with this proposal to meet the educational needs of the Indian community. Dato' Deputy Speaker, I would also like to take this opportunity to record my millions of thanks to the State Government, especially the Chief Minister, who intervened and resolved the relocation problem involving 14 houses, four (4) temples and one (1) shrine on the Ministry of Home Affairs land lot in Sungai Dua, to make way for the construction of the new Contingent Police Headquarters together with police quarters. This issue has arisen for a long time, since 2007. Two representatives before me and I am the third representative, with the assistance provided by the State Government and so on, this issue was resolved well, through the negotiations we have carried out, and the residents have received fair compensation for those involved in this construction. Furthermore, the State Government, through the RIBI Committee and also the Hindu Endowment Board, has provided land for the relocation of four (4) temples and one (1) shrine on the adjacent land lot owned by the State Government, with an area of 4,000 square feet for each place of worship involved. I, as the State Seat Assemblyman, thank the State Government. I also request the assistance of the agencies involved to help and facilitate the construction process of these places of worship. Dato' Deputy Speaker, I would also like to raise an issue or my written question. Written question number one, which I asked about the work to upgrade the drainage system in Minden Heights. In the reply I received from the Honourable EXCO, it was stated that the work to upgrade the drainage system in the Minden Heights area was completed in 2020 with a total cost of RM500,000.00, but I am not sure whether the JKR has repaired the drain that I have raised several times in this honourable House, because up to today, flash floods still occur in that area, when rainwater from the USM area flows down into this area. So I hope a precise explanation can be given to me. I would also like to raise another issue that has been delayed for so long, namely the repair of the roof leak in the Halaman Kenanga low-cost flats block by the PDC. The reply I received was that the PDC is still in discussion and they will also carry out a site visit as soon as possible, but however, the site visit could not be carried out because of the Movement Control Order in force throughout Malaysia.

Deputy Speaker of the HouseEN

Thank you, Batu Uban.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Dato' Speaker, just a little more.

Deputy Speaker of the House

Terima kasih.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Dato' Speaker, just a little more. I hope and beg that the Honourable EXCO can intervene and resolve this issue, which has been delayed for almost seven (7) years. I feel pity, seeing that some occupants have to rent other houses because the current condition of the houses is not safe for occupation. Dato' Deputy Speaker, lastly, I would like to take this opportunity to thank the State Government for tabling the Amendment Bill to lower the eligible age of candidates to contest in the general election (PRU) from 21 years to 18 years. I should have been one of the debaters, but at that time the time was limited. So I ask for five (5) minutes more from Dato' Speaker... (interruption).

Deputy Speaker of the HouseEN

Thank you, Batu Uban. Everyone has already spoken about the age.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Just five minutes, Dato' Speaker, five (5) minutes.

Deputy Speaker of the HouseEN

I think, I have to.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Five minutes, Dato', five (5) minutes, Dato' Speaker. As a young person, Dato' Speaker.

Deputy Speaker of the House

Saya tau.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Therefore I support and welcome the amendment Bill. If young people don't speak, it's not possible, Dato' Speaker. So I welcome the amendment Bill that was tabled by the Honourable Bagan Jermal. So I extend my congratulations to him, because I see this amendment as a positive step and also an Independence gift for our young people. Lowering this age limit and allowing 18-year-old candidates to contest will enrich the democratic process of the State of Penang, and at the same time test the capability of the young generation in the arena of national politics, and will open up space and opportunities for young people to emerge as members and leaders in mainstream politics in Malaysia. More young people participating in mainstream politics will help strengthen the democratic process in Penang, because this is a formal method of involving the young generation in the formal political process and the national political landscape. We want to see more young candidates who will be with us in this House, and we can debate policies and laws for the good of the state. Therefore, the preparation for the age of 18 to become candidates and voters needs to be enhanced by all parties. The readiness and maturity of young people to take part in the democratic process must be polished before they are given the opportunity to become people's representatives. The most important element is education on politics and also democracy. I recommend that bodies such as PYDC should play an important role in providing exposure to political knowledge to young people in order to produce the best leadership quality for the state and nation. Organise more discussion and forum programmes so that young people are exposed and improve their political skills through training and also mastery of communication. I also wish to propose in this honourable House that a political education institution, with respect, a school for young politicians, be established, perhaps under PYDC, so that we can provide training and also nurture a positive and responsible democratic process by strengthening the capabilities of Penang's young people. In addition, this institution can also develop young political leaders who will lead responsibly, with discipline and accountability in the political parties they represent.

Deputy Speaker of the HouseEN

Thank you, Batu Uban.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Democratic unity through understanding and appreciation, last sentence, Dato'. A better understanding of the role and function of political parties in a democratic society is very important so that we can appreciate the principles of good governance, namely good governance. With this, I support it, thank you, Dato' Speaker.

Deputy Speaker of the HouseEN

Thank you, Batu Uban. Next, the winding-up speech of the Yang Terutama Yang di-Pertua Negeri of Penang. Please, Penanti.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Speaker, I ask that Members who could not debate be given room to interject during the winding-up.

Deputy Speaker of the HouseEN

If the question is not a repeat, a relevant question, I will allow it, but if it is repeated again, COVID-19, COVID-19, COVID-19, I will not.

Satees A/L MuniandyDAP · PHBagan DalamEN

The biggest COVID-19 issue.

Deputy Speaker of the HouseEN

The issue has been raised for two (2) days and we have given everyone the opportunity to speak about COVID-19. About preventing, treating and everything. And also the procedures of the Ministry of Health. So I now ask Penanti to wind up.

Lee Chun KitDAP · PHPulau TikusEN

But Dato' Speaker, if he winds up, we must also give feedback. So I ask for permission later to interject.

Deputy Speaker of the HouseEN

We give good suggestions. We allow entry.

Satees A/L MuniandyDAP · PHBagan DalamEN

If there is any wrong information, it must also be corrected.

Lee Chun KitDAP · PHPulau TikusEN

Yes, we have to correct it, Dato' Speaker.

Deputy Speaker of the HouseEN

That, if you can, you can be corrected outside too with the winding-up. Not in the House. Thank you, sit down, Bagan Dalam and Pulau Tikus, sit. Penanti.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, and greetings of peace to... (interruption).

Deputy Speaker of the HouseEN

Sorry Penanti, I did not give you time. I give you only 20 minutes. So please do not repeat what has already been discussed.

Yes. First of all, Honourable Dato' Yang di-Pertua and Honourable Members, Deputy Speaker. First of all, allow me to record my words of thanks and gratitude that I am still given the opportunity to deliver the winding-up speech in this honourable House. For MMK Agro Technology, Food Security, Rural Development and Health. I would also like to say millions of thanks to all the Honourable Members who have actually told all the anxieties felt by the people of Penang in their respective areas. Actually, we understand, but I want to say thank you, that this matter was debated well in this State Assembly sitting. I want to start with the most important thing first, which was raised by everyone, but before that, regarding the BID data just now, sorry, the death data for stay home for patients registered with CAC. So I just received, like two seconds ago, actually it is not one but seven (7). This is what has been told.

Satees A/L MuniandyDAP · PHBagan Dalam

Brought In Dead.

What is this, the deaths, deaths of patients under the supervision of CAC, but, this, it's alright, later I will give other data as well. I also keep asking, even I asked the Minister, please check whether this data is correct or not?

Lee Chun KitDAP · PHPulau TikusEN

Honourable EXCO, I want to ask Penanti, I just want to say something first. I hope the State Government under the leadership of the Honourable Penanti will also take steps and take its own initiative. Do not just blindly follow the Federal Government.

I think I want to correct the perception of you, my colleagues. I want to tell you what is actually true if.... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Deputy Speaker, I just want to correct it. What I raised is those who died after being quarantined at home only, without receiving any assistance or health guidance from the Ministry of Health or, you know, people who can give advice, doctors and so on, but not about CAC. About the brought in dead cases in Penang who were quarantined at home before they died.

Under CAC supervision, according to the Deputy Director of Health it is seven (7), he has just updated it, but if we look at the distribution of deaths, from COVID-19 in terms of brought in dead, this is the data I received on 29 August, no new data has been received by me. Okay, if we look here, brought in dead males 77, 64.7%, females 42, 35.2%, Malaysians 95 persons, 79.8%, non-Malaysians 24, 20.2%. According to district, Northeast 36, Southwest 20, North Seberang Perai 20, Central Seberang Perai 30, South Seberang Perai 13, in terms of each group child zero... (interruption)..

Satees A/L MuniandyDAP · PHBagan DalamEN

No, Honourable Penanti, sorry for interrupting,

Deputy Speaker of the House

Penanti, I think you are giving record of the death, death of COVID-19.

This is brought in dead due to COVID-19...(gangguan)..

Satees A/L MuniandyDAP · PHBagan DalamEN

That means, these brought in dead, before that they were quarantined at home, right, because... (interruption)..

What I got under CAC... (interruption)..

Satees A/L MuniandyDAP · PHBagan Dalam

No..no..no..not CAC...(gangguan)..

No, this one is just brought in dead, yes...(gangguan)..

Satees A/L MuniandyDAP · PHBagan DalamEN

Brought in dead who were quarantined at home, la, or without any quarantine, or they themselves did not inform... (interruption)..

That means he did not die in hospital... (interruption)..

Satees A/L MuniandyDAP · PHBagan DalamEN

Not died in hospital, we are asking about those COVID-19 patients who were positive... (interruption)..quarantined at home who were brought in dead to the hospital... (interruption)..that means 100 more, the total number... (interruption)..

This is the one I gave data on. What I mentioned just now is 119 persons... (interruption)..

Satees A/L MuniandyDAP · PHBagan DalamEN

That means what was said before, that only one died, is not true, 119 persons... (interruption)..

The non-brought in dead is 437, the brought in dead is 119... (interruption)..

Satees A/L MuniandyDAP · PHBagan DalamEN

That means 20% of those who died in Penang were also quarantined at home, that is what the Minister stated, I think the number tallies now, thank you.

So what this means here is child (1 person), young adult (17), matured adult (51), elderly (50). In the term for comorbidity status (78), that means 65.5%. Vaccination status for those brought in dead: completed 2 doses (12 persons), 10% who had none, incomplete vaccination (107), 90%. Okay, so that is the data for those brought in dead. I want to say here what I did as EXCO for Health of Penang during this pandemic. I wrote to the Minister of MOSTI at that time, because vaccines fall under MOSTI, and what I wrote and gave as the planning proposal for Penang was to use the concept of decentralisation. The first thing we should have done at that time was to look at the elderly home clusters. So the first thing we did was send outreach teams to 132 elderly homes to vaccinate them, even before the frontliners. We had already vaccinated 132 elderly homes. Then, at that time, I thought, why not go to the source, because out of the 80 clusters we had, 60 were factory clusters, and only 6 were workplaces that were not factory clusters. So factory clusters were indeed very high. So the first thing in my letter, and also in the meeting, I asked that they pay, meaning we give the vaccines free, and the factories set up PPVs at their premises and pay for their own doctors to vaccinate. So we have set up 14 industrial PPVs, as I mentioned before, under PIKAS. We have also set up in Penang, under the State Government under BPEN, PPVs for livestock farmers, fishermen, and mamak shops, which also received vaccines, and we set up under the State Government, meaning not under MITI for non-manufacturing. So 1,500 chicken farmers have all been vaccinated. We gave, what is it, 20,000 vaccines there, and at the moment we have vaccinated around 10,000 for food shops, because when we open we want all the workers to be vaccinated. So we have another strategy, which is mobile outreach as I mentioned earlier, not only to elderly homes but mobile outreach to elderly in villages or anywhere, and hotspot areas that find it difficult to go to a PPV themselves or do not trust the vaccine. According to the data, we have sent more than 9,600, where the State Assemblymen asked for mobile outreach or mobile PPVs to go to their areas. We used buses, first we used the LPPKN bus, then we used the Rapid bus, so we sent them to schools or wherever to vaccinate inside the bus, which we have done. Apart from that, we have... so at the end of the day, we have 45 PPVs in Penang, and the largest number of industrial PPVs in Malaysia, up to 14, have all finished vaccinating. We also did common PPVs, okay. So that is one of the ways, and the good news is that when I was in CITF, actually, in CITF, if we look at Selangor, the EXCO for Health of Selangor is not in CITF. The National CITF meeting is attended only by the SUK or the Director of Health. I am the only EXCO at the federal level, I mean in Peninsular, who attended to represent the Penang State Government to obtain vaccines. Everything the CM told me to do, to get more vaccines, go and find all those vaccines, that is my job...(interruption)..

Deputy Speaker of the HouseEN

Honourable Penanti…

No, no, can I just finish?

Deputy Speaker of the HouseEN

If possible, please do not repeat the same things that you have already discussed in the question...(interruption).

No, tak, tak ini tak disebut... semua orang kata in the EXCO we are not doing anything (gangguan).

Deputy Speaker of the House

Sudah disebut kami dah dengar dah, we already heard that thing abput you have been seating there..(gangguan)..

Okay, let me finish…(interruption)..

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Honourable Penanti, I have an issue regarding CITF…

Deputy Speaker of the HouseEN

Comes with something new…(interruption)..

Yes, sekejap-sekejap, based on this…(gangguan)..

Satees A/L MuniandyDAP · PHBagan Dalam

Timbalan Yang di-Pertua Dewan, I think she has to withdraw dia perlu tarik balik kenyataan yang menyatakan “..semua orang panggil saya (kurang jelas Exco)..” who called that? So we need to know. Tak ada orang yang panggil ..(gangguan)..kita ada tanggungjawab terhadap rakyat yang mengundi kamu di luar.. ..(gangguan)..kami tanya soalan ini sebab COVID-19 is killing of people, just because we are asking does not mean you being a lainda… (gangguan)

No, no, I am not angry at all…(interruption)

Satees A/L MuniandyDAP · PHBagan Dalam

She cannot make that kind of comment here...(gangguan)..

No, not at all, I am not blaming anyone, I just want to try to correct the perception....interruption).

Deputy Speaker of the HouseEN

It's alright, Honourable Bagan Dalam, sit down first..sit down first...(interruption)..

Okay, so with this I want to announce that the issue Doctor Afif asked earlier, why Selangor only gave 20,000 free. That is actually wrong. Selangor gave us a loan to accelerate 200,000, and we received a letter in black and white on 30 August approving that if we take the loan from Selangor, and Selangor and the Central Government will return Penang's vaccine quota to Selangor when we finish vaccination. But this morning I also received good news from the press conference yesterday of YB KJ, who announced that Penang gets 1,015,500 vaccines for this September, and we get additional ones. So we do not need to borrow from Selangor. Of course Selangor has been so kind to us, even offering a loan which is worth maybe 30 million...(interruption)..

Lee Chun KitDAP · PHPulau TikusEN

Honourable Penanti...(interruption)..

Wait, let me just finish this, just a moment, this is important. For week one of September, we were only supposed to get 140,000 vaccines, but he added another 200,000. I spoke to YB KJ just now, who met with our vaccine head, Dr. Farzana, and also met this morning at 8.30 am with Dr. Rafidah, so we got it...(interruption)..

Lee Chun KitDAP · PHPulau TikusEN

Honourable Penanti, I just, can you just make sure, just make sure…

So that means in September we get 360,400 doses, and in week two we get an additional 218,900, so that means in week three we get another 110,000. Before this, we did not yet have these figures, but now we have fresh ones from the meeting. I just got them from the Deputy State Secretary (SUK). So with the vaccines we receive, 360,400 for the first week of September will arrive tomorrow, and with the 218,900, InshaAllah we can vaccinate, since we still have more than 160,000 Penang residents who have not yet been vaccinated, and the data that ..(interruption)..

Lee Chun KitDAP · PHPulau TikusEN

Honourable Penanti, allow me a moment, I want to speak...(interruption).

No, I don’t have that much time I have to finish I just want to finish sekejap...(gangguan).

Lee Chun KitDAP · PHPulau Tikus

Can we just say something..(gangguan)..

Deputy Speaker of the House

Pulau Tikus I think you can keep your question for the last lah I give you two minutes to let her finish her penggulungan…(gangguan)..

Okay, so that means, up to 1 September, those who have received at least 1 dose is 1,159,739, which means 1.1 million (65.4%), and in terms of the adult population, adult, adult, sorry, adults, 84.8%, and two (2) doses 57.9% as of 1 September yesterday. So the types of vaccines we received, yes, based on this morning's meeting, are Pfizer 765,000, Sinovac 200,000 which we will receive tomorrow, additional to the Pfizer 140,000, AstraZeneca 40,000, and Cansino for one-dose vaccines, so that we can, you know, for refugees, people who are difficult to reach, people who are difficult to meet for the second dose, we get 15,000. InshaAllah we should get it in August, a week before they give it to those foreigners, that we get more than 1 million vaccines. So all this is not without effort; if we did not ask, we would not get it. Another thing I asked for is that, because cases have risen too high, CAC does not face constraint problems. We hope that what I have requested and discussed with the Director of Health and also the Minister is that, as happened to all our public PPVs, all our public PPVs have been handed over to Protect Health, to GPIS and Private Health Care, so not a single public PPV is being managed, which means we need to deploy doctors from the State Health Department (JKN). Another thing I also asked for, which has happened as of today, is that for our CAC, where 7,800 people are quarantined at home under its supervision, only categories 1 and 2, but it can escalate. As we saw just now with the brought in dead figures, I have asked Protect Health to come, because our GPIS have all finished vaccinating. Most have finished vaccinating at the industrial PPVs, because all this private sector vaccinated at the 14 industrial PPVs. Most of our industrial PPVs, now how many are left? Only the common PPVs like Exora, Pearl View Hotel in Prai, both in Prai. The others are no longer needed...(interruption)..

Deputy Speaker of the HouseEN

Honourable Penanti, only three (3) minutes left.

The other thing I want to mention in three minutes is that we have also asked to use the Act to force our private hotels to take 30% of level three to five patients, because now they only take level one and two. So, to help, we use the Act. Currently only 5% of COVID-19 patients from hospitals are taken by private hospitals, so they must play their part, because private hospitals have 66 ICU beds, 49 HDUCCU beds, and 78 ventilators, so they can help. The most important, another important thing mentioned by all the State Assemblymen here, is the anxiety and fear faced by COVID-19 patients who stay at home. That is why I, together with Doctor Liong and Doctor Darin, this means we really cooperate, we help our JKN. We set up this PUCC, which is a COVID-19 command centre. We set up the COVID-19 emergency careline. That means calls to the 999 number for COVID-19 patients will go to the COVID Emergency Careline, where we will text all the staff there, they have shifts, and they will call the patient. The caller could be her sister in Johor, and there are also those who are 94 years old. They call the patient, and there is an assessment. There is an Emergency Physician who will do the assessment, send their call, and then based on their condition, we will send what is called a high-risk transport vehicle, because COVID-19 patients, when they are in a condition where they often call 999, cannot breathe. This morning I also received a call from 35 elderly people at an elderly care centre in BM, they can't [breathe], they are already worried, they have already panicked. So that is what we do. Our team, when we call them, sometimes we come and pick them up. 90 percent of the cases are because they panic. But we know, as I said, we just set this up, because as I said, actually this matter under the Health Department, Act 342, is under the Director of Health, and when they ask for help, and we know, so we created a backup team to provide this Rapid bus which will transport patients to PKRC level 3 and 4, and if they are severe we send ambulances. We also have vans. We cooperate with Kembara Kitchen, also under NAFAS, which helps us...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Excuse me, Penanti. I take this opportunity not to blame Penanti or anything, this is not to blame Penanti.

No, its okay, I don’t mind, actually.

Satees A/L MuniandyDAP · PHBagan Dalam

What I’m saying is because...(gangguan).

Deputy Yang di-Pertua Negeri

Bagan Dalam. Question or suggestion? Come to the question.

Satees A/L MuniandyDAP · PHBagan DalamEN

I ask a question to get clarification.

Deputy Yang di-Pertua Negeri

Come to the question.

Satees A/L MuniandyDAP · PHBagan DalamEN

What has been stated here about the COVID-19 Command Centre and so on, okay, we appreciate it. The problem now is that those quarantined at home, not all know how to call. Sometimes there was one case of my friend from Air Itam, an uncle who suddenly had breathing difficulties, and he went to the Service Centre yesterday, a COVID-19 positive case. So we ask that the home self-quarantine policy be reviewed. I understand the Health Department has constraints, the manpower problem, recruitment and everything, but the Right Honourable Chief Minister and also the Honourable Member for Sungai Puyu have already obtained assistance from this party, so can we open more low-risk quarantine centres across the constituency? That is what we need now. It is an immediate need, Penanti. Thank you.

I know. Yes, the solution is that what the Health Department asks for is to have more private PKRCs in hotels or budget hotels, because in hotels and budget hotels there are proper beds, there are toilets. If staying at MEC, KMP, Kompleks Masyarakat Penyayang, it is almost like a hospital...(interruption).

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Excuse me, Penanti.

Want to answer the question.

H’ng Mooi LyeDAP · PHJawiEN

I want to answer regarding private hotel PKRCs. Are people who are facing economic problems now still able to pay such high costs, like Royal Chulan at RM250.00 a day?

Not telling the people to pay. We want to use money from the Federal Government under NADMA, which pays for people staying at PKRC. It pays. It costs about RM50.00 per person per day. Now, instead of staying uncomfortably, crowded together in piles, staying in hotels paid for by NADMA. That is what we asked for.

Satees A/L MuniandyDAP · PHBagan DalamEN

Will this be implemented in Penang?

Yes, we have already requested this.

Satees A/L MuniandyDAP · PHBagan DalamEN

Requested, but will it be implemented? Why was it not implemented before, until the cases were every day around 2,000? So when will it be implemented?

As I said, the surge in cases.

Satees A/L MuniandyDAP · PHBagan Dalam

Adakah Kerajaan Negeri bercadang untuk inject some fund on this or only NADMA or some other way. Is there any other way (dengan izin). Saya setuju.

Everything, sometimes the money arrives late. For example, even our PPVs, even the money we first spent, even the ICU field unit at Kepala Batas, we spent our own money first. As for the ICU field unit we have now, it is only suitable for staying two or three days, that is fine, but if one wants to stay there for a long time, the ICU field unit is for disaster situations, floods or anything. But for a long period, like COVID-19, it is better to have PKRCs, which are actually hospitals, with oxygen, with air-conditioning, comfortable, rather than staying in a tent. That is why, even for the PKRCs now, we upgrade them to level three and four. Then, for people staying in proper hotels paid for by NADMA, after all NADMA now does pay. It pays for utilities, it pays for food, it comes to RM50 a day. It is better, we help all our tourism sectors, there are no people. It is category one and two, and then we get Protect Health, as I said just now, to monitor them. That is our plan.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, I think it is a good suggestion. Can we carry out, implement this as soon as possible, and go to the categories of areas which are severe? I got the answer from Honourable EXCO about the areas that are very severe in terms of deaths. I think the highest deaths are in Air Itam, Penaga, the Jawi 13 area, and the Batu Lanchang 10 area. Do we look at, through the high deaths, whether they are given priority? That is, expedited, because quarantine really cannot wait long, many patients are still at home. First thing I ask. Second thing I ask, can YB. EXCO obtain an allocation for all representatives here? An allocation to buy test kits for COVI-19 patients in our areas, or oximeters for us. Get an allocation for Members of the State Legislative Assembly.

I strongly agree....(interruption). Especially every house must have an oximeter, every house should have one.

Ong Ah TeongDAP · PHBatu LancangEN

We hope there will be an allocation from Honourable EXCO or an allocation from the State Government to help us.

I ask the State Financial Officer to please give, because my MMK money is not enough..(interruption).

H’ng Mooi LyeDAP · PHJawiEN

Okay, Penanti. Dato' Speaker, just one question. The situation at the PKRC MEC Jawi is quite bad. I want to ask whether the YB. EXCO can kindly give a message to the person in charge, especially for cleaning inside the PKRC, because I often receive calls from members of the public, even patients at the PKRC MEC Jawi, because they think the area is under Jawi, but actually it is under the Sungai Bakap area. However, I will try to carry out my responsibility to everyone. The situation inside the PKRC is indeed quite bad, but we also cannot blame the party or the Ministry of Health (KKM), because there may be patients who like to throw away face masks or other things and cause blockages. So I feel the State Government should monitor this case or pay attention to these issues. The second point is related to home quarantine in the Bukit Panchor area, which is an industrial area, so the situation in Bukit Panchor is indeed serious. If our hotspot keeps increasing, the number reported to the KKM is at least 350 cases. Only three (3) are reported, but there are some cases that are not reported. I know that some factories conduct self-tests, and they do not dare to report to the KKM. Some workers have also contacted me saying their factory has 40 cases, but when I checked with the PKD, only five (5) cases were reported. The residents around their houses often make complaints. Yesterday, I succeeded in getting one homestay to evict 17 people on that same night, just yesterday. So I hope we must pay attention to the foreign workers' hostels located in residential areas.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Penanti, please give me a chance. This is also an issue of the PKRC cases and is also related to the addition of vaccines to Penang. Congratulations to our state for receiving more vaccine doses. However, we know that even though the vaccine doses have been increased, it will take time for people to be vaccinated. That is why experts now say the COVID-19 crisis we are facing in Penang may continue for another two (2) months, because it will take time to administer these vaccines. I return to the PKRC. The PKRC was mentioned earlier, and there is a proposal to use private hotels, which I want to focus on. I hope the EXCO can help with this issue. What has not yet been answered is about the PKRCs that were previously proposed to factory employers to be opened to quarantine their workers. As mentioned earlier by Jawi, the same thing happened in Bukit Tengah and also in SPS. I believe these factory employers are using houses in residential areas and housing estates as quarantine centres, and there are many complaints where these employers, late at night, Dato' Speaker, bring large groups of workers into the housing estate to be quarantined. Under very suspicious circumstances, in the middle of the night, they will come. So we must have a method to control this. I mean, even now, during a full lockdown, according to the SOP, even locals cannot move around, they cannot move houses, but here the factory is moving people from one housing estate to another housing estate....(interruption).

Deputy Yang di-Pertua NegeriEN

Honourable Member for Bukit Tengah, if there is such a case, it is the responsibility of the State Assemblyman of the area to make a police report, and police action will be taken.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

We have indeed made police reports, Dato' Speaker. We have made police reports, we have made reports to the JKD, we have made various reports, until the MPKK. I said he was very embarrassed. He said to me, "YB, I want to provide breakfast outside, the kampung..." He was also embarrassed, because the public will be angry with him because no action has been taken. So that is why I hope for attention and for it to be given.

Actually no.. actually, we have, what is it.. the JKN has.. we have done, what, we received 13 applications from, this is for the workers, yes... applications to become private PKRCs only. Out of the 13 days ago, only two (2) were willing. So, according to the conditions, perhaps we have to look at it.. I want to read out the numbers. Yes, Hotel Vouk in George Town has 230 rooms, but only 69 were used. It opened on 24 May 2021, and on 25 August 2021 there were 99 people, only 30 percent, meaning there were charges and it was paid by the employer. Hotel Royal Chulan, where JABIL workers numbering 46 people were quarantined from 20 June 2021, opened on 4 June 2021 and closed on 20 June, 129 rooms. This means these are hotels that have previously become private PKRCs. Hospital Seri Malaysia Bayan Baru has 135 rooms, and only 19 people stayed there, opened on 6 August 2021. The room charges include food, all of it, but on 25 August 2021 there were 32 people. The private PKRC Hotel Mei in Penang has 69 rooms, and this is free for B40 sponsored by NGO Crest. That is all. Actually, as I said, there are 13 other hotels that applied, but when they were offered, they withdrew, leaving only two (2).

Satees A/L MuniandyDAP · PHBagan Dalam

Okay Penanti.

But we will try,,.(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Why did they withdraw? Is there any specific reason?

According to the JKN, it is because of the conditions, the conditions, because these are COVID-19 patients, so there are some SOPs that must be followed,...(interruption).

H’ng Mooi LyeDAP · PHJawiEN

Honourable Penanti, Dato' Speaker, a proposal from me, from Jawi, where I ask the KKM or the PKD to report factories where there are positive cases and which are asked to close or asked to quarantine, to report to the District Police Headquarters, because the OCPD once told me, I once asked the IPD SPS whether the PDRM received any information from the PKD, and the answer was there was none at all. So we ask for the cooperation of the PDRM so that the PDRM can help us conduct frequent patrols in residential areas, especially for hostels in residential areas, because at this time the PKD really does not wear pink, the pink wristband, everything they just let it be, or you quarantine yourself. Foreign workers, but foreign workers still go out. So I ask for cooperation between the PKD and also the IPD. Thank you.

Speaker (Speaker)EN

The question is clear. What is your name, Penanti?

Just want to explain,,..(interruption).

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Penanti, I think the issue of the PKRC...(interruption).

Actually, the powers under Act 342 have been delegated down to the DO. Actually, the DO, you can all ask the DO for this information, but it has not reached me, it has reached the DO, yes...(interruption).

H’ng Mooi LyeDAP · PHJawiEN

I think the YB. EXCO can propose this in meetings, because there are meetings that we are not invited to. Therefore, in this honourable House, we ask, through the goodwill of the YB. EXCO, to help the representatives of the people to channel important information from meetings. Thank you.

I have, I have already asked, I want to say here, in a meeting together with the MKN, all of them, I have applied for the Disaster Committee that deals with all the details of COVID-19 at the district level, and I think several ADUNs have also joined. I definitely applied, I asked to be included in the EXCO Meeting as well. I myself was not included, and after I complained many times in the EXCO Meeting, only then was I able to join the disaster committee meeting of my own district, SPT. So I was able to attend two (2) meetings. But like this, like now, I think we are all working together, because we must understand that the JKN is a federal agency, and I think we now have a good relationship. We support each other. For example, the CAC does not have enough people, its ambulances and everything are not enough, and its emergency lines also have no one to follow up. Let us help with that...(interruption).

Satees A/L MuniandyDAP · PHBagan Dalam

Dato’ Speaker, we are coming to the original point again…(gangguan).

Speaker (Speaker)

Then you abort it…(gangguan).

Satees A/L MuniandyDAP · PHBagan DalamEN

Our concern is not about cooperation. What we ask is for more quarantine centres everywhere, PKRCs. Earlier the YB. EXCO answered that budget hotels can be turned into PKRCs...(interruption).

Ah yes, that's right, yes...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Or low-risk quarantine centres. Our question now: the EXCO himself answered that there are 16 hotels..(interruption)

13…

Satees A/L MuniandyDAP · PHBagan DalamEN

Offered themselves to be, but only two (2) succeeded, and…

Agreed, I have, I have already explained earlier...(interruption).,

Satees A/L MuniandyDAP · PHBagan DalamEN

Fourteen others withdrew. So we want to know why they withdrew. In fact, according to the information received from the EXCO, another 7,000 people are still being quarantined at home. If we count, the hotels in Penang are plentiful. I think there are enough to accommodate all of them in hotels. What problems are being faced, and when can it be implemented? This is what we want to know. Do not let it be that after this, at the next DUN sitting, we are told, okay, 50 hotels are ready but only two (2) can operate, the other 48 cannot...(interruption).

Speaker (Speaker)

Bagan Dalam?

Satees A/L MuniandyDAP · PHBagan DalamEN

Many will have already died by then, Dato' Speaker...(interruption).

Speaker (Speaker)EN

Penanti, what is it? Please give the summing up.

Okay, the summing up. I will work on this matter. As I said earlier, if it is about NADMA, the issue is also about cost. For ordinary people, such as employers, they may be able to pay, but if NADMA pays, that RM50 per day, meaning there is a subsidy, so the cost will be even lower. The other thing I want to mention is about the Delta variant, which I obtained the other day from the Deputy Director of Health during my morning session. At that time the data came out, so sorry, I did not have time, but the latest data I have received is that the Delta variant as of 31 August 2021 was 32. The North East District had 4, South West 16, North Seberang Perai 1, Central Seberang Perai 9, South Seberang Perai 1, okay.

Speaker (Speaker)

Sambung.

Okay, I also want...(interruption).

Speaker (Speaker)EN

I give a little additional time since this issue is the most important issue for this session. Other EXCOs do not have such privileges, okay.

Ahh, thank you. For.. I want to go to...(interruption).

Speaker (Speaker)EN

Just do not go back and forth, the arguments that have already...(interruption).

No, I want to move to another important portfolio. For the portfolio of Food Security and Agrotechnology, we have already, what is it, new things we have done to help the B40, low-income people and fishermen as well, especially fishermen who are sometimes affected by any projects, development... So, for example, to help increase income for fishermen in Penang, this year we have spent RM660,000 to carry out an oceanography study in SPU, SPT and SPS for mapping cockle farms. Cockle farming is a project where 21 hectares are given to fishermen or B40, young people or whoever, and they are given TOLs, and we have completed this for SPU. This means that SPU previously did not have cockle lot TOLs, but now we have 13, and we have opened it. The Fisheries Office has opened the advertisement, the closing date is 22 September 2021, and we want, we have already seeded the cockle seeds, and by September we will seed 10 tonnes...(interruption).

Speaker (Speaker)EN

Penanti, wrap up what has been touched on in the debate session, otherwise it will never end.

Tak ni...(gangguan).

Speaker (Speaker)EN

Those, the Honourable Members who rose in the debate session, the winding-up should prioritise that first, the others can be avoided.

But this is important to help, help everyone...(interruption).

Speaker (Speaker)EN

If the type of Honourable Member does not rise...(interruption).

Agroteknologi lah…(gangguan).

Speaker (Speaker)EN

I ask the Honourable Member to make the announcement through the Honourable Member's channel. Please. I want to tidy up. In this House, wrap up only what was raised...

Okay, okay, for the questions, those are questions related to agriculture too.

Speaker (Speaker)EN

Is there a question of that type?

Yes, there are questions that were raised. The programme for community farming is also to help our people get an increase of RM1.2 million, and we have started the Farmer to Farmer project to help those who have lost their jobs. 10 communities, an allocation of RM320,000. Okay, the cockles mentioned earlier can also generate income of, just a moment, yes... ah okay, for, we have three (3) places for the cockles mentioned earlier, just want to add, Beting Selatan, SPU and SPT. At Beting Selatan, which is in SPS, 80 lots have been offered and will produce 120 metric tonnes per lot, so if multiplied by RM7 per kilogram, it will generate RM67.2 million in income for fishermen and B40 in SPS. The estimated income per participant per harvest is RM105,000 per harvest, meaning RM17,500. So we have done it, we have started, and we also give exemptions, what is this, the TOL for the fisheries earlier has ended. For livestock farming, for livestock farming, we have a collaboration with FELCRA in Penang. We have about 300 hectares of FELCRA land where the oil palm plantations are already old, and we have made a collaboration where the cattle, the thousands of cattle in Penang, will be moved to FELCRA land. For example, in DTL and on the island, all the cattle do not have licences from the MBPP, so we will move them to FELCRA land in the South West District. Likewise in SPT, along the riverbanks, we have obtained FELCRA land and the farmers have agreed. So, this is among what we are doing, to help ensure Penang continues to have fishermen who will give us cheap fish, and also poultry farming and all that. We help them, and so that when they are in illegal places, I mean places that are unlicensed or will not be given licences, they will go to places with a symbiotic relationship with FELCRA. Thank you very much...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Speaker, I cannot debate on agriculture. Actually, I want to ask in my debate about the Perda Agrotechnology Farm Park. I received a written reply stating that nearly 147 hectares or acres of land, which was the former site of the Northern Corridor Implementation Authority project, has been left abandoned. What is the plan, here I ask the question, what plan, how the land will be developed. It is stated here that it will be developed as the Perda Agrotechnology Farm Park. What specific plans are there there, is there any development, or will it remain abandoned?

Yes, yes... the remaining lots that have been left abandoned, please remember Perda is federal, meaning it is not under the Penang State Government, even though it is land, okay...

Satees A/L MuniandyDAP · PHBagan DalamEN

But the land was leased to the Penang State Government?

No, no.. This is Perda land, 1,000 acres, leaving over 100,000 acres, sorry, just over 100 acres. Twenty acres we have set aside for an autonomous smart farm on that land, the part that was mentioned as abandoned. It was abandoned not because, we know, it was a federal project from long ago, so we rescued it. We placed the best local automation company, a local company, I cannot mention the name... but it is, what is it.. Perda has agreed, the Department and the Ministry have agreed that we build this autonomous smart farm like an assembly line, but actually this smart farm involves about youth on 20 acres, and the rest of the 80 acres involves youth. That is what we are doing.

Speaker (Speaker)EN

Penanti, I give you maximum time not exceeding five (5) minutes. I give it.

I would also like to mention here that we have increased or enhanced assistance to fishermen in Changkat. They began with the design made by JKR, which the fishermen rejected, so we made a new design. It includes a fish market. This is to help about 150 fishermen who have boats there, so that when we hopefully emerge from COVID-19, they can develop the fishing sector and anglers can come there. We have already given money there, and also for fishermen affected by the sea reclamation project in the Northeast district, namely the fishermen of Gurney, Tanjong Tokong, Paramount and Tanjong Bunga. We also help them with what they need, such as a sneakway, and they also asked for TOL and so on. That means the sea reclamation is ongoing. So we are helping them so that they can carry out their fishing activities. They also asked for floating jetties and jetties. All these costs are being calculated by BPEN, and the Chief Minister has asked that BPEN table a holistic plan at the EXCO meeting on how we can help fishermen affected by the sea reclamation. Also, for fishermen in the PSR area, we are allocating clam TOL. There, because we have calculated it, we are working with FRI so that they can increase their income there. Also in the village, the silted jetty on the SPU side and also in Penaga, their jetties are being upgraded so that they become usable, and also the Bagan Ajam jetty to become a site for commercial clam landing.

Speaker (Speaker)EN

Okay, only two (2) minutes left.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, I want to ask about the COVID-19 question I raised earlier in my debate. It was not answered at all. My debate was about a proposal. My proposal is that when wearing the pink bracelet, you go back to basics, meaning we look back at Phase 1, when we were able to control it strictly. Now it has indeed been relaxed, because most positive COVID-19 cases are not wearing the pink bracelet. This means that some people wander out without being controlled, and for up to five (5) or seven (7) days they can still go out. So I propose: is there a way we can devolve power, delegate power to hospitals, clinics and the private sector? Give them the authority, allow them to put the bracelet on positive cases.

Yes, that's right. This has actually already been proposed, so that when people go to a clinic they can be braceleted.

Ong Ah TeongDAP · PHBatu LancangEN

Once they are positive, they are given it immediately. So we want an answer. And secondly, it concerns the third dose of the vaccine. What proposals are there from the EXCO or the government regarding the third dose? We have heard that it has already started in other parts of the world, so we do not want to be late again.

Speaker (Speaker)EN

Okay, Batu Lancang. Clear. Is there an answer?

On the third dose, we have discussed it, but for now it is not in Penang, and I think in many other states too, because the vaccine surge of seven (7) million was given to Klang Valley. Seven (7) million, together with Sarawak. Sarawak also received this additional supply. Klang Valley means that now we want to vaccinate, at least, the whole population to receive the second dose.

Speaker (Speaker)EN

What is the name, Penanti, the last summary I am assisting with? In the case of COVID-19, many Honourable Members have stood up, but the Honourable Members in this House must also understand. Nevertheless, under the Federal Constitution, health is in the Concurrent List, meaning it is a shared responsibility between the Federation and the States. And we must also be fair to those who are responsible; it is not that they can get a decision here just like that. So I hope there are good proposals, and we send them to the Honourable EXCO or the government, and not just stop within this sitting of the House. And what I can request from the EXCO or the government is to receive them well, and we try, through a joint mechanism with the Federal Government, that we ask. So I ask, what is the name, Penanti, let us summarise.

Just one minute. I will summarise.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Explanation, Honourable Penanti. Before you go to, it's just a proposal, don't worry, just a proposal. Thank you, Honourable Penanti. As the Dato' Yang di-Pertua the Honourable Dato' Yang di-Pertua raised earlier, indeed we saw that when the EXCO Penanti made the wrap-up, there was a lot of data, and in fact many actions have also been taken by the State Government. We agree with that. Not to say that the State Government has not made efforts, many efforts and much allocation that we have delivered; we try our best to do the best even though we know all this is a failure of the Federal Government, which could not control the COVID-19 pandemic. However, I hope that Honourable Penanti, if possible, the matters or information that you have shared earlier can be made into a statement for the public, so that people out there know. I give an example: today I myself, together with the Honourable Air Itam, have had to respond to false accusations that Air Itam Market was closed, Lebuh Cecil Market was closed. Our task now is to respond to fake news outside. So I request that, if there is accurate information, correct information on the efforts that have been made, we convey it to the people so that everyone knows what initiatives or efforts we have taken. That is my proposal.

Speaker (Speaker)EN

Thank you, Pengkalan Kota.

I strongly agree. I have asked many times in meetings that everyone will. Okay.

Speaker (Speaker)EN

Penanti, summarise. I don't have time.

I want to summarise here, in terms of the proposal about the people with bracelets. Actually, from the very beginning I proposed using RFID, so we don't need bracelets at all. Use RFID on the person, or the IC or whatever, I don't know exactly, but since our IC already has a chip, anyway I have proposed it, but I don't know whether, legally, it is not allowed to RFID people. I am not sure, but I applied for it a long time ago. Another point is the utilisation rate of vaccines in Penang, which means when people are given vaccines, we use them up completely. 95%, among the highest in Malaysia. So I have planned together with PDC and NCIA. We already have one thousand acres of land that we want to make a plan for vaccine production. All the PPV, with all the mass testing, whatever it is, we will do it there at Jarak, SPU. So now the blueprint is being completed in a short time, and the landowner has also agreed, only a joint venture with the State Government. So that is the timeframe, because we know this vaccine means we must have the third dose, fourth dose and so on. With this, I respectfully request to support.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Please clarify. Honourable Penanti, please clarify the proposed location, because I think it is within my area. Thank you.

Yes, the 1,000 acres is on the PERDA side. On the PERDA side, it is a thousand. What we plan is an integrated Biomedical Park with Smart Farming, because on that side we have an Autonomous Smart Farm. And we have USM, which is a Biomedical Faculty. So that means the need for graduate manpower is very close. That is what I can tell you in the plan. Thank you. With this, I respectfully request to support. Thank you.

Speaker (Speaker)EN

Thank you, Honourable Penanti. It is not easy for the Health EXCO in such a serious pandemic period. I thank you sincerely, and I would like to ask Bagan Jermal just to wrap up what was raised. If not, I will stop immediately.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Mr Speaker, Honourable State Assemblymen, Heads of Government Departments, gentlemen and ladies, good afternoon and greetings. I would like to express my appreciation and thanks to all the Honourable Members who took part in the debate this time, especially those involving my portfolio. I would like to thank Tuan Yang di-Pertua Tun, who has graciously agreed to be appointed patron of the Penang State Sports Council. Sports development in the State of Penang must be seen as a chain or ecosystem that requires various stakeholders moving in step with appropriate programmes and strategies, to ensure that a long-term sustainable performance chain and a more comprehensive grassroots high-performance sport can be achieved. The concept of the chain in sports development refers to the importance of several components: strengthening the State Sports Associations, developing state athletes, developing quality coaches, providing state sports facilities and infrastructure, and state athlete welfare programmes.

Allow me to share two (2) main focuses of the State Government's efforts in sports, namely the development of state athletes and the state athlete welfare programme. In line with the State Government's efforts to further increase the number of quality coaches and to build a potential and bright career path for Penang athletes, the Penang State Sports Council launched the Penang Junior Coaches programme, or PJC for short, on 12 August 2021. The objective of PJC is to increase the number of quality young state coaches, to further expand efforts to absorb them into the sports field from the grassroots level. Apart from providing career opportunities for state athletes and former state athletes as young coaches or junior coach... (with permission), under the MSN athlete development programme. The PJC programme begins in its first phase involving ten types of sports, namely badminton, netball, basketball, hockey, petanque athletics, sepak takraw, silambam, silat and boxing. The programme registration for applications to join the programme is open to all athletes and former athletes of the State of Penang who are interested in becoming young coaches, aged from 18 to 25 years, and residing in the State of Penang. To ensure their technical skills are at a high level, their basic eligibility is based on experience as a state athlete in national-level championships or equivalent, subject to the stipulated conditions. The State Government places its full hope that the planning of this programme can help state athletes and former state athletes to develop their success in the field of coaching as one of the career paths. Young coaches who have been identified will then be eligible to be appointed by MSN on a part-time basis, or to help and introduce, and further strengthen, sports at the grassroots level. They will be paid allowances. For your information, we estimate, and I believe, that through the PJC programme, it will contribute and provide almost 200 job opportunities for them. The State Athlete Welfare Programme (PACE), a welfare programme component that is the sustainability of state sports development, the basis of which is a balance of an athlete's working life. In this modern era, the main challenge faced by sports bodies in retaining the group of state athletes is in the puzzling phase of whether those athletes will remain active in the sport they have taken up, or take steps to stop, to pursue education or work in another field. Accordingly, the Penang State Government is very concerned about such situations and continues to take proactive steps in establishing a special programme with the concept of caring for the welfare and future of athletes, namely PACE. The PACE programme started on 1 August 2020, last year. This aims to help and support the success of Penang State athletes towards education, success and welfare. Since its establishment, PACE has helped as many as 80 athletes who have benefited from and received assistance from the fund. The sports index, given the limited time. I will only share these two (2) aspects. The sports index, in response to the call of the Honourable Chief Minister, the State Executive Councillor for Youth and Sports (MMK Belia Dan Sukan) has collaborated with Penang Institute to conduct the Penang Sport Index survey online from 4 January to 15 April 2021, and succeeded in collecting data analysis according to the needs and preferred sporting activities of all segments of society in the State of Penang. The number of respondents received was 1,530 people. Based on the results of the study, the State Government was able to identify and provide complete sports facilities that meet the current needs of the people of the State of Penang. This sports index aims to identify the community's experience of existing sports facilities. Popular types of sport among the Penang community, the frequency of sports and recreational activities among the Penang community, the sports facilities desired by the Penang community, and also the community's views on sports facilities that need to be upgraded.

Below are three (3) categories of aspects of the study, namely popular types of sport among the Penang community. Jogging activities obtained 56%, being the most favoured sport. The second most favoured type of sport is badminton at 34%, while hiking and jungle tracking are third at 32%. The fourth popular sport is cycling at 31%, while 19% of all respondents chose gym workouts and 16% of them chose exercise activities such as aerobics and zumba. Sports facilities desired by the Penang community. The sports facilities most in demand are jogging tracks at 53%, gyms at 35%, 33% of respondents chose public exercise areas for the elderly, and 27% chose children's playgrounds. There was also demand for swimming pools at 26% and badminton courts at 25%. In brief, this study recommends several matters: we will upgrade and improve the facilities that need to be built, and also the frequency of community use of such facilities. To answer the question raised by the Honourable Sungai Dua, who requested that the construction of the Pokok Sena Sports Complex be refined, given that the Tasek Gelugor area still has no facilities such as a sports complex. For the Honourable Member's information, the proposed development of the Pokok Sena Sports Complex is located on Lot 4377, with an area of 32,364 square metres. The lot is government land that was gazetted for public purposes, namely a public field and sports complex, in 1992. The Penang Stadium and Open Spaces Corporation has completed the updating of the preliminary sketch drawings for the proposed development of the Pokok Sena Sports Complex project. Several components have also been placed and proposed. Besides that, the Penang Stadium and Open Spaces Corporation will hold a public engagement... (with permission) Dato' Speaker, or focused discussion programme to obtain special information from local residents and the surrounding community for the proposed development of the Pokok Sena Sports Complex project, after the funds applied for are approved. At that time, we will also invite the ADUN Sungai Dua to come and join us for the public engagement. Penang FC, Penang Football Club, in line with the approval of the proposed takeover of Penang FC Sendirian Berhad on 3 February 2021. The State Government has decided that Penang FC Sendirian Berhad be placed as a subsidiary of a GLC under Chief Minister Incorporated, or CMI, in an effort to develop football in the State of Penang. Among Penang FC's achievements in the Malaysia Super League season of 2021, Penang FC is now in fourth place.

Speaker (Speaker)EN

The Honourable, the TYT has already mentioned this. Can you summarise?

Soon Lip CheeDAP · PHBagan JermalEN

Yes, with 37 points as of 1 September. Youth development in the State of Penang. The Penang State Government would like to take this opportunity to record a thousand thanks to the Honourable ADUN Seri Delima, who focused on the increase in the youth unemployment rate, or gerjen. The State Government is very concerned about this issue and is committed to helping young people who are... (interruption).

Speaker (Speaker)EN

Honourable Member, I have already heard that answer in this House just now. If possible, please summarise.

Soon Lip CheeDAP · PHBagan JermalEN

Okay, I will summarise. Indeed we have many plans, I will summarise. Based on the public-private partnership (PPP) principle, the Post-COVID-19 Penang State Youth Economic Development Action Plan will be implemented by the Penang State Government, in collaboration with PYDC, which will generate and optimise comprehensive economic programmes for the youth. One (1) of the aspects emphasised in this programme is the employment aspect, with three (3) objectives and six (6) strategies envisaged. I will not go into detail, I will go into detail in the future. So, in line with the concept of social development under the future youth initiative, the State Executive Council (MMK) for Youth and Sports and PYDC have established, and will establish, 40 youth centres, and the first youth centre established is in Penaga. I want to answer the question from Seri Delima, who also proposed the establishment of a Seri Delima KADUN youth centre in Kampung Sungai Gelugor. For information, we will extend the application to the Bertam youth centre as well as the Balik Pulau Youth Centre, which officially began operating in August. Youth centres that are in the process of preparation and will begin operating are in the Penanti area, the Batu Kawan Youth Centre, the Sungai Pinang Youth Centre, the Bagan Jermal Youth Centre and the Seberang Jaya Youth Centre. Meanwhile, the establishment of the Seri Delima and Machang Bubok Youth Centres is under discussion. For the information of this esteemed House, the Penang State Government has established Best Anak Penang. The Penang Young Talent Excellence Incentive Scheme, through approval of MMK Kertas MMK on 30 July 2021, is to show appreciation to youth aged 15 to 30 who have brought honour to the name of Penang State at national and international levels, in terms of academic achievements as well as KK activities. Applications for this incentive scheme will be opened next year, 2022. Further announcements and information will be carried out at a later date. Mr Speaker, once again I extend my highest appreciation and thanks for the continuous attention, comments and support from Honourable Members, particularly towards the efforts carried out by the Penang State Government to add value and strengthen the quality of delivery under the Youth and Sports portfolio for comprehensive development at the state level. Thank you. I beg to support.

Speaker (Speaker)EN

Thank you, Bagan Jermal, congratulations. Paya Terubong, I request.

Yeoh Soon HinDAP · PHPaya TerubongEN

Mr Speaker, Honourable Members and Heads of Department, Gentlemen and Ladies. Greetings of peace. I would like to record my highest appreciation to this esteemed House for giving me the opportunity to deliver the winding-up speech to present, to some extent, the issues of tourism and the creative economy.

Mr Speaker, as Honourable Members are well aware, the COVID-19 pandemic has disrupted development and caused the performance of various industries, including the tourism sector and the creative economy, to decline, particularly with the recent increase in cases. Both these sectors are among the very important assets of Penang State and have also contributed to the economic development of Penang State. Various actions and strategies have been, are being, and will continue to be taken by the State Government to curb the impact of the spread of the COVID-19 pandemic. In terms of the State Government's policy, it will focus on domestic tourism to revive the tourism economy and the creative economy while awaiting the reopening of the national borders. In fact, my office has drafted one (1) careful tourism recovery plan, a tourism recovery action plan, which also covers short-term, medium-term and long-term actions. Due to time limitations and not being permitted, I will not explain it thoroughly in today's speech. I would like to help, to some extent, with the issue of quarantine centre hotels that was raised by Honourable Members, including the Honourable Member for Bukit Tambun and the Honourable Member for KOMTAR. Regarding the matter of the use of hotels in Penang State as Quarantine and Low-Risk Treatment Centres (PKRC). The State Government takes note that COVID-19 cases are becoming increasingly serious and existing quarantine centres may not be sufficient to accommodate the growing number of COVID-19 patients. In fact, the State Government has often called for such transformation through media statements and also tourism industry associations. For information, Royale Chulan Penang will function as a PKRC starting 2 September and will be opened to the public, where one (1) medical team or medical team will be provided at the premises. As of 1 September, the State Government, through my office, has received one (1) more application from a hotel on the island, on this island, that is interested in being made a PKRC, and as additional information, two (2) hotels in Seberang Perai have also submitted applications to become quarantine hotels. Both these applications have been forwarded to the State Health Department (JKN), and for further action it is hoped that the State Health Department (JKN) can expedite the appropriate process to curb and overcome the problem of the shortage of quarantine places in Seberang Perai, and at the same time my office has also helped to schedule one (1) discussion session between the Penang State Health Department and Penang State hotel operators. The session will take place at the nearest possible time, most likely to be scheduled next week, where the mechanism for using hotels as PKRCs and also quarantine centres and also quarantine centres for close contacts will be discussed, as well as the relevant procedures. In fact, hotel quarantine is one (1) alternative apart from public PKRCs for those who are willing to pay and also for those who are able to pay, and indeed at the initial stage many hotels were interested in being made PKRCs. Because the criteria or conditions, which may be somewhat stringent or strict, many hotels could not comply with the criteria determined by JKN. That is why most hotels have withdrawn, and as circumstances have changed, it is most likely that JKN will also discuss with hotels so that these criteria or conditions can be relaxed somewhat so that more hotels can be used as alternatives for quarantine.

And here regarding the creative economy. The State Government thanks Seri Delima for its concern towards the creative economy industry in order to help the creative economy. The State Government launched the Creative Live Loan Scheme to ease the financial burden of creative economy industry players, and the State Government also often works together and supports programmes of non-governmental organisations (NGOs) as well as associations and individuals involved in the creative economy field to help those who have been severely affected by this pandemic. Among the initiatives recently introduced, we have provided a platform and channel for artists to generate income during this difficult season, such as the Caricature Corner, and also sand sculptures at PPV SPICE, and this has made Penang a state that has PPV that provides ... has created PPVs that have elements of arts, and we are now also discussing with artists and PPVs to possibly bring in virtual artists, not performing arts, to give presentations or performances in these PPVs to help them generate a little income. Apart from that, the State Government has also encouraged artistic groups to organise art activities and programmes online to enhance the digital experience among such groups so that they can adapt to the new norm. The recovery process of the tourism and creative economy sectors is expected to take time, and the vaccination process is an important factor that will help to improve the pandemic situation and reduce its impact. Therefore, the State Government has accelerated the vaccination process among workers in the tourism sector through the Penang State Government Frontline Economic Sector Vaccination programme (PVac). More than 90% of workers in the tourism sector have been vaccinated with at least one dose, and the reopening of the tourism and creative economy sectors is subject to the current pandemic situation across Malaysia and will be in line with the decisions of the Government through the National Security Council (MKN). In conclusion, the State Government will continue its efforts to restore and also to develop the tourism and creative economy sectors so that both these sectors can become major contributors to the Gross Domestic Product (GDP) of Penang State. Thus, thank you. I beg to support.

Speaker (Speaker)EN

Thank you. And next, Batu Maung.

Zairil Khir JohariDAP · PHTanjong BungaEN

Batu Maung is not here, so I will reply first.

Speaker (Speaker)EN

Does Batu Maung not want to wind up or want to skip?

Zairil Khir JohariDAP · PHTanjong BungaEN

I am not sure, Mr Speaker, but since he is not here, I will wind up first.

Speaker (Speaker)EN

Next time must be prepared. Please, what is the name, Tanjong Bunga.

Zairil Khir JohariDAP · PHTanjong BungaEN

Mr Speaker, I will focus on the questions raised in the debate only. I will not touch on other issues.

Speaker (Speaker)

Ya. Betul

Zairil Khir JohariDAP · PHTanjong BungaEN

First of all, Mr Speaker, I would like to take this opportunity to convey congratulations to TYT Tun Dato' Seri Utama Yang Terutama Tun Dato' Seri Utama Ahmad Fuzi Haji Abdul Razak on his appointment as the eighth Yang di-Pertua Negeri of Penang State, and thanks for TYT Tun's kindness in attending and officiating the State Legislative Assembly sitting. Our hope is that Penang State will become increasingly progressive and prosperous under the administration and governance of TYT Tun. Not forgotten also is a message of greetings on the celebration of the 64th National Day of Malaysia to all Malaysian citizens, particularly the residents of Penang State. Although we are all experiencing difficulties due to the COVID-19 pandemic which is still spreading, I am confident that with the resilience of the people of Penang State, who have never admitted defeat, this state will certainly rise again in the future. Therefore, the State Government is taking proactive steps to draft short-term, medium-term and long-term plans to study and plan strategies to restore the economy, especially those related to infrastructure and transportation sector development issues in Penang State, in order to drive sustainable economic growth and reduce the negative impact on this sector. Mr Speaker, the Honourable Member for Bukit Tambun asked about the status of the Valdor Bridge project across Sungai Tengah as well as the extension of Jalan Perusahaan Valdor which should have been completed. In addition, the Honourable Member also asked about the issue of the road connection from Bandar Tasek Mutiara to Hijauan Hills. For the Honourable Member's information, there were issues of plan approval and road damage that occurred in the implementation of the Valdor Bridge project. For the issue of plan approval, the Seberang Perai City Council (MBSP) has required that a U-turn be provided for heavy vehicles. The PDC will discuss with the MBSP in the near future regarding the sharing of how to share funds among developers in Valdor. As for the issue of road damage, it was caused by design factors by the consultant who did not comply with the specifications, and construction by the contractor who did not comply with the plan. Therefore, the meeting with the Honourable Member for Bukit Tambun himself on 27 July last agreed that plan approval be obtained and fund sharing be agreed before construction work is carried out on site. Besides that, for the issue of the road connection from Bandar Tasek Mutiara to Hijauan Hills, the State Government has decided that the construction of the road be made a condition for the developer Tetuan Palmington Sdn. Bhd. if the developer submits a new Planning Permission Application (PKM) for a project at Bandar Tasek Mutiara in the future. This also includes projects around Bandar Tasek Mutiara and is not only subject to development in the township. The construction of this road must be carried out before a new project can be started. However, until now the MBSP has still not received any PKM from the developer. Mr Speaker, the Honourable Member for Permatang Berangan raised the matter of frequent accidents occurring on the main road of Tasek Gelugor and the Simpang Tiga Kampung Tok Bedu junction. Jalan Kampung Tok Bedu is the main route for residents in the surrounding area, including from Kepala Batas, who frequently use the road. For the Honourable Member's information, the Public Works Department (JKR) has conducted a traffic count, and the results of the traffic count found that there is a need for the installation of traffic lights at the junction. So JKR will table the results of this traffic count to obtain approval through the Traffic Committee Meeting at MBSP level. Subsequently, the JKR will apply for allocation through the 2022 development budget for the purpose of constructing these traffic lights. Besides that, the Honourable Member for Permatang Berangan also raised the issue of building traffic lights to reduce congestion at the Simpang Tiga Pokok Tampang junction. For this issue, Honourable Member, JKR has no plans to install traffic lights at the junction because there are already traffic lights at a distance of approximately 50 metres from the junction there. Besides that also, if the construction of traffic lights is carried out, it will involve relocation work for existing shops and require road widening for smooth traffic. However, the JKR will make improvements by adding the number of transverse bars and warning signboards in the area so that drivers and riders are more alert. Next, the Honourable Member for Permatang Berangan

Member for Permatang Berangan (YB. Nor Hafizah Binti Othman):

Please let me interject.

Zairil Khir JohariDAP · PHTanjong BungaEN

Please

Member for Permatang Berangan (YB. Nor Hafizah Binti Othman):

Thank you, Mr Speaker. Thank you, Tanjung Bunga, for the explanation. However, there may be some confusion about the location. What I understood just now is that there is no need for Simpang Pokok Tampang, but what I meant in my debate yesterday was the junction from, if from Tasek Gelugor, the Pokok Tampang junction heading towards Lahar Yooi on the right and on the left to Padang Menora. That means there may be a need there. It may be possible to review whether it is necessary or not, because there is also congestion there due to the main route from Tasek Gelugor to Sungai Dua. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

I will ask the Honourable Member's officers to contact the Honourable Member to confirm the location, and also perhaps to discuss the need with the JKR officers.

Member for Permatang Berangan (YB. Nor Hafizah Binti Othman):

Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay. Next, the Honourable Member for Permatang Berangan also applied for the upgrading of the bund road in the paddy field area at Lorong 28, Pengkalan Batu Pokok Tampang along the bank of Sungai Tok Keramat. Correct? Okay. The Drainage and Irrigation Department (JPS) has informed that the Jalan Ladang bund road in the coastal bund area is a road for the purpose of estate mechanisation and is used for the transport of agricultural inputs such as fertiliser, pesticides and seeds for the rice granary area.

The road falls under the Integrated Agricultural Development Area (IADA) Penang State project, where the original function of the agricultural road is suitable for agricultural machinery. For this issue, the need to upgrade the road will be studied and proposed, and if approved will be proposed by JPS to IADA. The Honourable Member for Permatang Berangan also raised the construction of a riverbank wall along the irrigation canal in Kampung Belukar, where an accident has occurred. For the Honourable Member's information, the construction of the retaining wall has already been approved in the Eleventh Malaysia Plan and has been implemented along the 700-metre Tali Air G Blok M5D after the accident occurred.

Mr Speaker, regarding the flood mitigation issue raised by the Honourable Member for Sungai Dua about the impact of floods in Penang State, I think the State Government has already informed many times of the large allocations spent through high impact projects and also Federal projects to address the flood problem. For everyone's information, two (2) high impact projects have been completed this year, namely RTB 4 and RTB Parit 5. RTB Parit 4 and RTB Parit 5 are both in the SPT area, and for the SPU district, RTB Mak Mandin will also be completed in the coming months, as well as RTB Sungai Nipah and RTB Bayan Baru in the Barat Daya district, which will also be completed this year. Another high impact RTB, namely the Alma Retention Pond in Bukit Mertajam, is also under construction and is expected to be completed by the end of 2022. In addition, JPS through the Federal Government has also completed the RTB Sungai Kerian project in SPS, while RTB Teluk Kumbar is in the construction process and is expected to be completed by the end of this year.

Mr Speaker, the Honourable Member for Sungai Dua raised the issue of floods and the main cause of floods. Honourable Member, I think the Honourable Member is aware that flooding has many factors. Among them is the geography, where Penang State is actually located downstream of the rivers flowing from Kedah State. Most floods in the Seberang Perai area sometimes occur not because of rain in Penang but because of rain in Kedah, where the water overflows excessively into the Seberang Perai area, especially when the sea tide is high, creating a clash between sea water and rain water. Apart from that, the causes of flooding are also drainage systems that are blocked by utility debris or old and low bridges. JPS always addresses issues related to this by using the development allocations of the State Government as well as the allocations of the Federal Government. The State Government has identified 63 active flood hotspots across the state, and it is expected that with the flood mitigation projects currently being planned, by 2030, 48% of all hotspots can be reduced.

The Honourable Member for Pantai Jerejak asked about the flood hotspot areas that occur in his state constituency. For information, the flood hotspot areas concentrated in the Pantai Jerejak state constituency are in the Bayan Baru area, and therefore the State Government has taken the initiative to implement the Bayan Baru flood mitigation project as one of the high impact projects, at a cost of RM20.2 million. The physical construction progress is 78% and it is expected to be completed at the end of this year.

Mr Speaker, the State Government's PTMP Project is responsible for ensuring that the projects planned under the PTMP or the Penang Transport Master Plan, including the PSR (Penang South Reclamation) project, are implemented for the benefit of the people. Although there are criticisms or objections, the State Government remains committed to helping the people understand the benefits that will be obtained from these projects and ensuring that no community is left out of the development current. These projects are major contributors to infrastructure investment and economic growth in Penang State. The role of the PTMP is to solve traffic problems, particularly by providing a rail public transport system that will reduce the dependence of Penang State residents on private vehicles. In addition to improving the standard of living and comfort of the people, this project will also help increase the productivity and competitiveness of this state as an international investment and tourism destination.

The current status of projects under the Main Roads and Tunnels is as follows: Package 1, the Twin Road from Tanjung Bunga to Teluk Bahang, is in the process of determining the alignment option; Package 2, the Tun Dr. Lim Chong Eu Expressway Bypass to Ayer Hitam, preliminary works for the construction phase of Package 2 were carried out on 31 October. In addition, the process of land acquisition is also being carried out. However, there were delays caused by the MCO, and much work could not be carried out, including consultant work such as soil investigation, where consultants were not allowed to enter the site due to the Movement Control Order; Package 3, namely the Bypass Project from Persiaran Gurney to the Tun Dr. Lim Chong Eu Expressway, is currently in the process of the contractor finalising the detailed design; and Package 4, the State Government is still in the process of finalising the approval for the draft feasibility study report submitted by the contractor for the tunnel. However, the spread of the COVID-19 pandemic has caused the implementation of PTMP component projects to be delayed significantly at the early stage due to constraints and obstacles to the planned work.

Mr Speaker, the State Government still considers the implementation of this PTMP to be very important, especially in the current situation, because this project will play a role as an economic catalyst, particularly in the post-COVID-19 situation to come. In the short term, the implementation of the PTMP and PSR will generate business opportunities for many local construction material and service supplier companies. These business opportunities will enable these companies to generate income and retain their workers, in addition to paying taxes to the government. Meanwhile, for the long term, PSR targets Foreign Direct Investment (FDI) with an estimated value of RM70 billion, and Gross Domestic Product (KDNK) is estimated at RM1.5 trillion, and creating more than 300,000 jobs by 2050. This development will become a catalyst for the growth of the manufacturing and services sectors that drive the state's economy. All these efforts must be implemented according to plan so that Penang State does not fall behind in an increasingly challenging world economy. If further postponed, the implementation of the projects involved will incur higher costs in the future.

One of the plans to make Penang more competitive is through the expansion of the Bayan Lepas free industrial zone to attract investors, namely to Pulau A, which will be located in the southern area of Bayan Lepas. The industrial zone in Pulau A will be developed as a high-technology industrial park which we call "Green Tech Park" to attract international investors in the high-technology E&E sector in the future. The development of Green Tech Park is different from existing industrial parks because it is specially designed to provide infrastructure to support the needs of IR 4.0, such as digital technology, e-commerce, Artificial Intelligence, 5G, Internet of Things, robotics and automation. In addition, the development of Green Tech Park will also comply with the principles of Environmental, Social and Corporate Governance and Sustainable Development Goals and take into account the proposed Low Carbon Cities Framework. This new industrial park will also be adjacent to a "software campus" which has the State Government administrative centre, arts and culture centre, convention centre, commercial centre and tourist attractions.

The State Government is confident that Green Tech Park will become a new international brand in enhancing and strengthening Penang's position in the global E&E sector value chain for the next 30 years. Mr Speaker, although there are challenges in obtaining approval and allocations for these projects, the State Government has never given up. For the time being, the State Government is still awaiting approval of the Environmental Management Plan (EMP) for the PSR project, and in the meantime, pre-construction activities such as survey work and soil investigation will continue at the project site. However, reclamation work will not be carried out until EMP approval is granted by the Department of Environment. Therefore, Honourable Member for Sungai Dua, do not worry, because the State Government guarantees that the implementation of the PSR project will only begin after EMP approval is obtained. The State Government will also ensure that impacts such as silt and mud will be controlled with mitigation measures.

In addition, the State Government is pursuing final approval to finalise the Bayan Lepas LRT, which had already received conditional approval on 18 July 2019 and is expected to receive full approval from the Land Public Transport Agency (APAD), hopefully next year, as the State Government is still in discussions with MAHB to finalise the alignment and stations of the Bayan Lepas LRT in the Penang International Airport area. The State Government is also now in the process of obtaining approval for the EMP report for the Pan Island Link 1 Project. In addition, at this stage, the appointment of consultants for the implementation work of the PIL1 project is also being carried out and is expected to begin design work by the end of September 2021 for Phase 1A, namely from the Tun Dr. Lim Chong Eu Interchange to the Tun Dr. Awang Interchange.

Mr Speaker, there is one issue that has been raised by several Honourable Members here, namely regarding the proposed Kulim International Airport (KXP). The Honourable Member for Pantai Jerejak and the Honourable Member for Machang Bubuk have raised the proposed development of Kulim International Airport or KXP. As the Honourable Member is aware, the construction of KXP falls under the jurisdiction of the Ministry of Transport. The State Government's stand is that the proposal to build KXP needs to be examined in depth and in more detail. This stand has been consistently expressed in the State Government's comments to the National Physical Planning Council (MPFN) through the MPFN Working Committee Meeting and the MPFN Steering Committee Meeting. In addition, JPS has also raised concerns about the river located in the middle of the proposed KXP site and the unsuitability of implementing a diversion for the Sungai Jerung there. JPS also informed that the water quality of the Sungai Muda, which is close to the proposed KXP site, needs to be protected, since the river is a source of clean water for Penang State and also Kedah State. In addition to the risk of threats to the river, the State Government also holds the view that the Federal Government should provide clarification regarding the status of this KXP project, as it is also directly related to the enlargement and upgrading project of LTAPP, namely Penang International Airport. As the Honourable Member is aware, the enlargement project of LTAPP is very much needed because statistics show that the capacity of Penang Airport has long been exceeded. In 2019, the number of passengers reached 8.3 million, even though our airport capacity is only 6.5 million, meaning we are already overcapacity. However, the LTAPP enlargement project that had been approved by the Pakatan Harapan Federal Government has been postponed in its implementation when the new Federal Government was formed early last year. The reason given by the Minister of Transport is that all airport projects in Malaysia will be postponed comprehensively until the results of the National Airports Strategic Plan (NASP) study are finalised. Therefore, the Federal Government needs to clarify whether this KXP has been agreed to or not, because the National Airports Strategic Plan study is still not complete. Mr Speaker... (disturbance).

Request for clarification, thank you. Honourable Member for Tanjung Bunga, regarding the winding-up on the issue, particularly the issue of Kulim International Airport (KXP) and also regarding the enlargement project of Penang International Airport. So for Kulim International Airport (KXP), I was challenged by MCA Penang to bring up this issue because they have forgotten that their President is the current Minister of Transport. So I am bringing up the KXP issue. For me, the interest of the people of Penang State, especially the water resources, namely the Sungai Muda that will be affected in connection with the development project, will have an impact on Penang State, but that is a matter for Kedah State. I accept that this is not the forum to discuss infrastructure development projects of other states. But as just now the Honourable Member for Tanjong Bunga raised the reasons of the Minister of Transport who stopped the enlargement project of Penang International Airport, I want to refer to a newspaper report from The Vibes dated 4 August 2021, which quoted a State Assembly Member of Penang, namely the Honourable Member for Seberang Jaya, who proposed that Penang State should close Penang International Airport to make way for the proposed development of Kulim International Airport or KXP. Just now the Honourable Member for Tanjong Bunga raised that many reasons were given, but now Kulim International Airport is being given a green light to proceed. Is this a sign regarding the decision or stance of the Federal Government, where there is a threat to Penang International Airport... (disturbance).

Speaker (Speaker)EN

Okay, the problem is clear.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member for Pengkalan Kota, this is exactly what we want to know. Mr Speaker, the State Government really wants to know a clear stance from the Minister of Transport: what is the Federal Government's stance, has the KXP project been agreed and approved, and if so, what will happen to the enlargement project of Penang International Airport. But what is surprising is that on that day we read in the newspaper that there was an MCA representative in Penang who opposed the KXP project, even though the President of MCA himself is the Minister of Transport, so he should have objected to the President himself.

Lee Chun KitDAP · PHPulau TikusEN

Excuse me for a moment. Does what the Honourable Member for Tanjung Bunga said give me the view that the Kulim International Airport is deliberately meant to threaten Penang, like a political issue, there are no other issues, this is purely a political reason. Therefore MCA has also become a Minister of Transport who has no power at all, but being in the government is only to get a position. I want to ask the Honourable Member for Tanjung Bunga, what is the logic of building a Kulim International Airport if it is not just to persecute Penang State... (with permission).

Speaker (Speaker)EN

Honourable Member for Tanjung Bunga, I want to remind you that it has been more than 20 minutes.

Zairil Khir JohariDAP · PHTanjong BungaEN

Not much left now, Mr Speaker.

Speaker (Speaker)EN

I request that, if possible, you summarise.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, good. Mr Speaker, all of us here are aware that Penang International Airport is among the most profitable airports for MHAB. It has among the highest passenger growth in Malaysia and the second highest cargo volume in the country. It is a very important and critical airport for the northern region. So that is what we want to know: whether it should not be politicised. We hope that the Federal Government does not play politics with Penang International Airport, and focuses on what was approved earlier, namely the expansion project to 12 million passengers per annum. We also want to know the position regarding KXP.

Okay, Mr Speaker, the Honourable Sungai Dua raised the issue of water supply cuts and hoped that PBA could give leeway to consumers, especially in this COVID-19 situation. For the information of the Honourable Member, the Penang Water Supply Corporation (PBAPP) will consider not cutting water supply for Tariff 1, namely domestic customers, during the pandemic until a period to be announced later.

As for the replacement of main water pipes, the replacement of main pipes in the Sungai Dua State Assembly constituency area will be studied and allocated in the PBAPP budget for 2022. However, the water pipe replacements that have been and are being carried out by PBAPP in the Seberang Perai Utara district are as follows: In 2019, one project was completed at Kampung Sungai Korak. In 2020, one project was completed at Jalan Mohd Saad. In 2021, two (2) projects are being carried out at Jalan Padang Tembusu, Penaga, and at Jalan Kampung Tok Bedu to Kampung Pokok Jenerih.

In addition, the Honourable Sungai Dua also raised the question of what actions and alternatives the State Government has in providing raw water sources for the State of Penang without depending on water sources from the State of Perak and the State of Kedah. For the information of the Honourable Member, Sungai Muda can only meet the raw water needs of the State of Penang until 2025.

Additional raw water sources for the State of Penang have been identified in the Penang Water Supply Initiative 2050 proposed by PBAPP. Therefore, the additional raw water sources identified are through the Sungai Perai Water Supply Scheme and the Sungai Perak Raw Water Conveyance Scheme. The Sungai Perak Raw Water Conveyance Project has stalled because the Perak State Government wants to sell treated water, while the State of Penang wants to buy raw water. As for the latest status, the Ministry of Environment and Water (KASA) has agreed to appoint consultants to carry out a study on the options suitable for implementing this project. This study is currently being conducted and is expected to be completed in November 2021. We hope that at that time, after the study is conducted, we can obtain a final decision on the future of this project.

In addition, PBA is also considering a desalination scheme as an alternative source of water.

This project is proposed to start if the raw water conveyance project from the State of Perak remains delayed until 2025.

This means that if we reach 2025 and still cannot get water from the Sungai Perak, the State of Penang may have to use the method of seawater desalination. However, you should know that if we do desalination, the cost of water is very high.

Okay, Honourable Mr Speaker...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Mr Speaker, I want to interject briefly about water, the source of this water. We always discuss this water. Kedah, especially one of its leaders, always says as if we are robbing Kedah's rights and so on. I do not want to go into that issue. But it was stated, "we are talking about desalination now, so...(with permission)", what about the earlier plan that was publicised, that there was also a plan to take water from the Sungai Perai. Is that still on? If it is Perak, then what about the Sungai Perai? This is my question.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member.

Speaker (Speaker)

YB. Tanjong Bunga, I give you another two (2) to three (3) minutes.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, the scheme for the Sungai Perai water conveyance is indeed in planning, it is among the options. But the problem with the Sungai Perai is that its capacity is not very large compared with the Sungai Perak. So even if we do it, it will not be enough to meet the needs of the State of Penang. This means other sources are still needed. Even if we do it, if we take Sungai Perai water, it will at a certain level still not be sufficient. Therefore, among the other options is desalination, desalination. Because we need it on a large scale, we will have new islands that will be reclaimed. Water needs will definitely increase in the State of Penang. Okay, because of lack of time, I will go straight to the last issue, which is telecommunications infrastructure. I will go to the PdPR issue. Earlier, in my oral answer, Mr Speaker, I already answered, so I will not repeat it. Only here I see, okay, the Honourable Machang Bubuk and the Honourable Permatang Berangan both raised the State Government's initiative in helping the underprivileged who cannot afford electronic devices. For information, although education falls under the jurisdiction of the Federal Government, the Penang State Government has taken the initiative to establish a special task force, the e-Learning Computer Programme task force. This is under the Honourable Padang Lalang, and I am confident the Honourable Member may also add more later. Through this programme, we have received contributions from companies that have helped, and then we distributed laptops to students. So, to conclude, Mr Speaker, the State Government is very committed to ensuring that infrastructure and transport development is carried out using the most efficient and sustainable methods for the benefit of the people of Penang. Therefore the State Government hopes that all parties, including government departments and agencies, the private sector, the Federal Government and indeed every level of society, can cooperate and always support every State Government initiative to develop and advance the State of Penang towards achieving the mission and vision of Penang2030. Thank you, I move to support, Mr Speaker.

Speaker (Speaker)EN

Thank you, Tanjong Bunga, neat. Thank you. Sungai Puyu.

Eh? Is it possible, Batu Maung…

Speaker (Speaker)

Nak bergulung?

Ya sikit…bergulung.

Speaker (Speaker)EN

Oh.. thought you didn't want to..

Already there… okay, proceed, Mr Speaker.

Speaker (Speaker)EN

Please, what's the name.. Batu Maung, 20 minutes.

Okay, Assalamualaikum and…(interruption).

Speaker (Speaker)EN

Only one thing mentioned in the House, the debate session only.

Okay. Thank you, Mr Speaker. Assalamualaikum and greetings of peace, Mr Speaker, the Most Honourable Chief Minister, the EXCO line-up, and all fellow State Assemblymen. Thank you for the opportunity to wind up the debate today at the First Meeting of the Fourteenth State Legislative Assembly. Congratulations to the Honourable Members who asked questions involving the portfolio of the State Executive Councillor (MMK) for Trade, Industry and Entrepreneur Development. Congratulations and gratitude are extended to His Excellency Tun Ahmad Fuzi bin Abdul Razak, who has been appointed as T.Y.T Yang di-Pertua Negeri of Penang. Penang is fortunate to have not only a son of Penang as T.Y.T Negeri Pulau Pinang, but also someone with extensive experience in the fields of diplomacy and foreign relations, who previously held the position of Secretary of the World Islamic Economic Forum (WIEF) Foundation from 2017 to 2021, and chairman of several public-listed companies. This experience and these credentials can certainly be put to good use by the Penang State Government.

Mr Speaker, we celebrated Merdeka this year just two (2) days ago in a rather sombre atmosphere. The COVID-19 pandemic has claimed nearly 500 lives in Penang. Earlier, Air Putih mentioned that in the past two (2) weeks, more than 200 lives of Penang's children were lost to this outbreak, and across Malaysia 15,000, and if we look across the world it has reached 5.5 million, compared with the Spanish flu 1933 which claimed 3 million people worldwide. We are losing this large number of lives like casualties of war. In fact, we are at war with the COVID-19 virus, which is why Penang adopted the theme Penang Lawan COVID-19, showing how serious this pandemic is. This is the time to unite all coordination and all machinery, individuals, Federal and State agencies, and it is time to stop politics that do not benefit the people. We must free the people from political turmoil that does not benefit them, free the people from COVID-19 and free the people from economic recession.

Mr Speaker, the State Government always gives primary focus to the welfare of the people, the well-being of the people. Safeguarding the welfare of families and communities, as well as preserving the integrity of public institutions. The Penang2030 vision very clearly places the family institution, "a family focus state", as the priority focus, which is accurate in that the welfare of individuals, families and communities is the policy of the State Government. Family welfare, a clean green environment, a healthy lifestyle and a smart state are exactly right. The welfare of the people will not happen if the environment is shrouded by the COVID-19 outbreak.

We welcome the effort of the Most Honourable Prime Minister, Dato Sri Ismail Sabri, in extending a hand to the Opposition Leader, Dato' Seri Anwar Ibrahim, leader of Pakatan Harapan, to together fight the COVID-19 outbreak and restore the nation's economy. We also welcome the appointment of the Honourable Khairy Jamaluddin as the new Minister of Health. We hope there will be good cooperation between the State Government and the Federal Government in tackling this outbreak. However, the appointment of Cabinet ministers drawn from the same leadership that was involved in administration during the 18 months of this COVID-19 outbreak, which failed to tackle the outbreak, has certainly left many unconvinced.

Next, in answering the questions raised by the State Assemblymen who asked. The Honourable State Assemblyman for Bukit Tengah proposed that the State Government set up a Special Committee to examine ways of resolving the factory cluster issue. For the information of the State Assemblyman for Bukit Tengah, the State Government welcomes that proposal. However, the State Government will study the feasibility and need to establish the said Special Committee, and if it is practical with an appropriate methodology, having taken into account factors such as cost, expertise, risk assessment and other relevant matters, the matter will be considered before being finalised and implemented. This matter will be discussed through the Industry/SMI/SME/Retail Sector Working Committee under the Penang Socio Economic Recovery Consultative Council (PSERCC). For the information of the Honourable Mr Speaker, the factory cluster issue is constantly discussed at the Penang COVID-19 Working Committee (CITF) Meeting and the State Security Committee Meeting, weekly, for the attention and action of each agency.

The next question concerning the factory cluster was again raised by the Honourable State Assemblyman for Bukit Tengah, requesting the State Government to conduct more integrated operations to monitor compliance with the Standard Operating Procedure (SOP) at factories. For the information of the Honourable Bukit Tengah, the State Government, with the cooperation of various departments and agencies at both Federal and State levels, and in particular the Local Authorities (PBT), constantly carries out compliance operations at factories on a regular basis.

The next question is still on this, and we find that the factory cluster issue is caused, as we know, by starting with the Movement Control Order (PKP), the Recovery Movement Control Order (PKPP), the Conditional Movement Control Order (PKPB), how many PKP. SOPs that keep changing have also affected enforcement authorities and the factory industry somewhat.

The next question on the factory cluster was from the State Assemblyman for Permatang Berangan, who recommended that the State Government examine methods to temporarily close factories with high positive case numbers. For the information of the Honourable State Assemblyman for Permatang Berangan, regarding the proposal to reduce the spread of the COVID-19 outbreak through closing the manufacturing sector with high positive cases, the State Government is subject to the strategies and policies set by the Ministry of International Trade and Industry (MITI) and the SOP. However, factory closures are often carried out based on preventive directives from the Health Department if there is a high number of positive cases. In addition, factories will also be closed if there are serious breaches of SOP compliance...(interruption).

Azrul Mahathir Bin AzizAMANAH · PHBayan Lepas

Mohon laluan.

Ya. Silakan,

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, Dato' Abdul Halim. The same issue also occurs in manufacturing. The complaints I have received are that when sick workers are treated at the in-factory clinic, it is just like that: they are given Panadol and no swab. When they check temperature, COVID-19 sometimes does not cause fever, like we say 39-40, right? Its symptoms are just that they feel weak, cough and so on. They go home, and go back again the next day, right? That is what happens, and then the virus spreads. So I ask that there be a directive in this manufacturing sector, likewise making screening mandatory if there are complaints from those workers, and not to force workers to still come to work. Thank you.

Speaker (Speaker)

Sila sambung.

State Assemblyman for Bayan Lepas, regarding that, in fact we have made a statement. I have made a statement asking all employers, whether factory or non-factory, to show mercy and compassion if their employees or workers are unwell. Give leeway and do not deduct wages, because workers sometimes fear having their pay cut and so keep working even though they feel unwell. A statement has been made on this. This is what I said requires cooperation from individuals, employers and so on.

Next, the earlier question from Permatang Berangan. In containing this factory cluster outbreak, the State Government is intensifying efforts, opening up and optimising the use of the PPV Vaccination Centres (Pusat PPV), as well as increasing inoculation. As mentioned by the Most Honourable Chief Minister and other Members of the House, the Honourable EXCO for Health, regarding the achievement of reaching 100% first dose by September and then the second dose so that we reach Phase 3.

Next, the efforts of my colleague from Local Government, my colleague the Honourable Datok Keramat, the efforts of Penang Saring COVID-19 (PSC-19), and also the efforts of The Federation of Malaysian Manufacturers (FMM), the S.A.F.E. programme. Another effort is from MITI itself through Safe at Work. The war against COVID-19 requires the coordination and cooperation of all individuals, agencies and authorities at all levels. The State Government welcomes contributions in the form of manpower, money, ideas, expertise and feedback from all parties to jointly fight this outbreak.

The State Government, in discussion sessions with CREST (Collaborative Research in Engineering, Science and Technology), will launch and share the "COVID-19 Management Best Practice SOP", a compilation of best practices in COVID-19 management by companies that have succeeded in containing infection at the workplace, as a reference, with the aim of helping SMEs (PKS) to operate safely at optimum capacity. A focus group is proposed, comprising representatives of CREST, MITI, CITF, InvestPenang, PDC and FMM, will be established. This focus group will act as a communication channel between authorities and industry players to discuss matters relating to COVID-19 control plans and procedures. The "COVID-19 Management Best Practice SOP", known as the Enhancement Health System (EHS) SOP, covering these 21 best-practice features, can be accessed via the websites www.penanglawancovid19.com and www.buletinmutiara.com starting next week...(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Request for explanation, Honourable Batu Maung. Thank you, Honourable Batu Maung, for raising in particular that, in the situation of the COVID-19 pandemic in our state, as disclosed by the Honourable Penanti, 70% of COVID-19 infections originate from the workplace. But this issue is actually about the "safe at work" initiative developed by MITI. Earlier, at a special sitting session, I raised that there was a complete SOP which covers preventive measures at the workplace, health screening, and also accommodation, transport and supervision mechanisms for workers. However, this SOP, which was introduced in early March this year, seems not to have been fully implemented at workplaces, and I think this is one of the main reasons for the spread of this COVID-19 outbreak at workplaces. So, perhaps I seek the views of the Honourable Batu Maung on this "safe at work" SOP.

If we look at the "safe at work" SOP, at the early planning stage its focus was more on isolation of the workers...(with permission) who were affected by COVID-19; the focus was there. But after that, there were complementary efforts on how to contain it, and additional SOPs came later. But originally, it only focused on isolation of the workers. That answers the question from Pengkalan Kota. Next, I go to the MMK for Entrepreneurs; before that there was another question from Buki Tambun. Please.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Request for an explanation on the screening issue. Could the Honourable Member give us the SOP on factory screening? I have read that there are many proposals, and I also want to know whether the Federal Government sees a need for periodic screening at factories, because there is no point in conducting screening once, and then two or three weeks later, or a month later, workers infect COVID-19. So, what I see now is that there are indeed many calls for periodic screening. What is the Honourable Member's view, and how will this be implemented? Thank you.

Thank you, Honourable Bukit Tengah. Actually, the factory industry is already required to conduct screening once every two (2) weeks. It is already in place. Since, I think, it was issued two (2) weeks ago.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

It only started two (2) weeks ago, right? Can we obtain data on how many workers have been screened according to the rules provided? Because the answer I received during this State Assembly sitting, when I asked how many factories, or workers in Bukit Tengah, had conducted screening, was 107. In my view, this is a very small number, because in Bukit Tengah, as I understand it, there are more than 1,800 factories. Given the critical period we are in, where we see the COVID-19 outbreak coming from these factories, more must be done to monitor the situation. We cannot go undertesting, we must ramp up our testing, as the Penang State Government has also done with the free screening previously offered in Penang, but specifically for factory workers. What is our plan to ensure periodic screening is carried out for factory workers? Thank you.

Thank you. I think the figure given, more than 100,000, relates more to vaccines. Vaccine doses for the industrial sector, 100,000 more than 250,000. However, we will ask CITF and the Ministry of International Trade and Industry (MITI) to refer back and verify our answer.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

For the information of Dato', so that action can be taken. My question is, how many manufacturing companies have conducted COVID-19 screening for their workers in Seberang Perai Tengah, particularly in the Bukit Tengah State Constituency (KADUN), since 16 March? The answer here: a total of 107 factories in the Bukit Tengah area have carried out COVID-19 screening on their workers. One, 40 factories conducted screening under the COVID-19 screening programme for foreign workers by PERKESO, and the remainder, the screening at factories, is a follow-up to the reporting of positive cases. So, what this means is that the answer given here is 107. Still very few, Dato' Honourable Member.

Thank you, Bukit Tengah, for raising the issue…

Deputy Speaker of the HouseEN

Batu Maung, just three (3) more minutes.

We will obtain an accurate response from CITF and also from MITI. Two more questions before I conclude. The ADUN (State Assemblyman) for Bukit Tengah proposed that the EXCO for Industrial Development act as an intermediary between food operators and the manufacturing sector, to enable food operators to open canteens in factories. We will discuss the feasibility of this initiative. The ADUN for Sungai Dua asked about entrepreneurship programmes. The State Government's programme to help SME entrepreneurs affected by COVID-19. Last year, in June 2020, the State Government set up the Penang Socio Economic Recovery Consultative Council (PSERCC). This is specifically for, under this sector, the MMK (Government Committee) for Trade, Industry and Entrepreneur Development, chaired by myself. From time to time, we hold meetings to plan action steps to overcome these economic problems. Among them is also to coordinate vaccination campaigns, such as cooperation with PIKAS and PVac, which carried out massive COVID-19 screening. I would also just like to mention the issue of the unemployment rate, which has risen again to 4.46%, and many people are under mental stress, depressed, and even committing suicide, as a result of being affected, vulnerable groups because of COVID-19. Therefore, the State Government, and the sector most affected, was closed for a period of four (4) months and not permitted to run businesses. Now, it is no longer, this is essential, this is non-essential, everything has become essential. When they cannot open for four (4) months, of course, there is desperation and so on. That is why we want to increase the doses, and that is why we want everyone's cooperation to tackle it. The State Government, on the basis of helping especially the groups that cannot run businesses, apart from the loan schemes and existing package assistance programmes before this, has also held a PEKA loan scheme of RM30 million in April last year and RM10 million PEKA for the tourism sector. The State Government, through the recent MMK meeting, has approved a total of RM5 million named the PKP 3.0 Scheme, for loan amounts of RM5,000 to RM20,000 to help these entrepreneurs. YB. As I mentioned earlier, 30% will be focused on young people under 40 years old, 30% of the loans will be for young people under 20 years old, and loans will be for a period of 30 months, with a six (6) month interest-free moratorium, whose secretariat will be handled by PDC. We will announce further details in the third week of this month. Due to time constraints, I have answered all the questions raised, and I once again thank all the agencies, especially the Chief Minister and fellow EXCO members. The agencies: the Health Department, PDRM (Royal Malaysia Police), MITI, APM (Malaysian Civil Defence Force), Tzu Chi, and NGOs also helped us in this crisis. Also frontliners such as MPKK, and staff of the Pusat Khidmat (Service Centres) who took risks to help the people in this crisis. Once again, let us work together to free ourselves from COVID-19, free ourselves from economic downturn, and free ourselves from politics that does not benefit the people. That is all, thank you. Assalamualaikum.

Deputy Speaker of the HouseEN

Thank you, Batu Maung. Please, Sungai Puyu.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you to the Deputy Speaker. I have many issues, but I will summarise. Of the time I have, I will give half to my colleague, because my colleague has many very important matters. I want to touch on the environment, and I want to congratulate and thank all the members of the Department of Environment (JAS) who have been very successful in controlling waste materials coming into Penang for recycling. We have succeeded in detaining a number of containers and sending them back. JAS has also been very successful in taking notice of open burning. And the law, the Environmental Quality Act, has been implemented, and there have been many successful cases too. I thank them. For the biogas at Valdor, everything has been resolved, and now they want to call for quotations, and there is confidence that construction will begin at the end of this year, and it will be ready at the end of the fourth quarter of 2022 and will operate in 2023. Here too I congratulate PGC, which represented the State of Penang and succeeded in the SEA Circular, namely the United Nations Environment Programme, coordinating with COBSEA, namely the Coordinating Body on the Seas of South East Asia, regarding plastic waste in the sea. Only two (2) states were appointed by UNEP, namely Selangor and Penang. I also congratulate PGC, which succeeded in the effort called the Cities Circular, where only three (3) cities, namely Melaka City, Seberang Perai City Council (MBSP) and Penang Island City Council (MBPP). Three (3) of them were appointed by the EU to carry out this project. Reports have been submitted and published by UNEP. Regarding welfare. Indeed… as raised by Penaga regarding the homeless. For the information of the Honourable Members, no centre for the homeless has been built by the government since independence until now. In 2003, the Federal Government held discussions with the State Government at that time. And there was a land exchange, one on the island and one federal government land in Jawi. Everything was completed, but very regrettably, until now this centre, named Kompleks Penyayang Sinar Kasih, has not yet been completed. I understand it can only be completed in 2023. That is what people call the performance of the Federal Government. Cannot build even one. On the other hand, in the State of Penang, the State Government allocated RM4.8 million to MBPP to build a homeless centre, a night shelter, on Jalan C.Y. Choy. If we look at it, according to the schedule, it should be 90 percent. But now it is only just over 60. This is what, roughly 100 days, a loss of 100 days because of the MCO. Could not succeed, could not succeed. Therefore, I am confident that if this MCO is lifted, and they are allowed to work, they can finish within 100 days of the scheduled date. These are problems with MITI, where the contractor has applied for permission and approval to continue working. They want it shown where is the focus quarters? This is not dangerous, we have made an appeal. But until now, permission has not been granted. I will probably discuss with my friend from Seberang Jaya, please help. Give me the opportunity to prepare this centre, because if I have prepared this centre, I can bring my friend from Penaga to visit there. But they cannot stay there because you are not homeless. On the issue of poverty. We have shown that in Penang, we have been very successful with AES. Where the State Government has given a guarantee in Penang that one family under one house, their income must not be less than RM790.00. Now it has been upgraded to RM1,300.00. And here we also succeeded in that in this time, in this year, we have brought 13,864 family units out of poverty with expenditure by the State Government of RM42,315,395.00. Programmes to repair houses and rebuild have also been managed and carried out. I believe these welfare issues have all been successfully addressed by us. Penaga also raised the food basket. I thank Penaga because Penaga at least took the initiative to send their representative only. Never mind, I gave food baskets to people who received them on the Penaga list. If Penaga, the Honourable Member for Penaga himself came down, I would be more generous. Compared with Permatang Berangan, at least he phoned my office. Thank you for receiving the food basket. That shows the State of Penang, the Penang State Government, is very caring to everyone. In welfare efforts, we do not take into account race, religion, political understanding, and so on. The Opposition Leader first received RM30,000.00, the Chief Minister received RM30,000.00. This year everyone received RM50,000.00. The Chief Minister also received RM30,000.00 until RM50,000.00. Everything has been done. Therefore, I believe that in Penang fighting COVID-19, if we all set aside political differences, we will succeed. I have confidence. But there must be cooperation between all parties.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Sungai Puyu. I thank the Honourable Sungai Puyu for his concern and also for the efforts he has made. I also acknowledge that the Honourable Sungai Puyu is often in contact with Seberang Jaya to provide assistance. Honourable Sungai Puyu, could you agree to what you mentioned just now, how much? That RM50,000.00 just now, perhaps the Honourable Sungai Puyu could propose to the Chief Minister to add more for this Opposition, so RM100,000.00 to RM300,000.00, Honourable Sungai Puyu?

Phee Boon PohDAP · PHSungai PuyuEN

Good afternoon, good afternoon, Honourable Members from Seberang Jaya. Just now, what I said, what is channelled to the ADUNs from the government is also channelled to the ADUNs from the Opposition party, the rival party. So I, wait a moment, wait a moment. If you want to ask for more allocation, I believe you can ask the Chief Minister later. Right?

Deputy Speaker of the HouseEN

Honourable Sungai Puyu, the MOU that was made was 10 minutes. It is already more than 10 minutes.

Phee Boon PohDAP · PHSungai Puyu

Okey.

Deputy Speaker of the HouseEN

And also do not entertain the Seberang Jaya questions, because they eat from both sides, left and right eat, that is all.

Phee Boon PohDAP · PHSungai PuyuEN

Okay, fine. Finally, I want to inform. I have promised, I am bound by my promise. A cow is tied with a rope, a person is tied by a promise. I promised 10 minutes, and there is only one minute left. Fine for… (disturbance).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Honourable Sungai Puyu, just one question.

Phee Boon PohDAP · PHSungai PuyuEN

This is injury time, yes.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Injury time. Thank you, Honourable Member. Only I want to speak briefly on the issue relating to the homeless raised by the Honourable Sungai Puyu just now. Recently, we saw the EXCO for Local Government, Housing and Health of Kelantan inform us that mental patients and the homeless will not be infected with COVID-19. This is indeed a statement that was issued. So I want to ask for the Honourable Sungai Puyu's opinion, does he agree with this statement, because for the Honourable Sungai Puyu, I thank you, because during the COVID-19 pandemic, the Honourable Sungai Puyu together with Tzu Chi has helped to prepare the Caring Community Complex as places where we check and look after the homeless in the State of Penang. But I want to ask the Honourable Sungai Puyu's opinion, does he agree with this Kelantan EXCO statement, that the homeless will all not get COVID-19?

Phee Boon PohDAP · PHSungai PuyuEN

I did not dare listen to what he said, because if I listened to his, I could vomit. Yes, indeed Dato' Deputy Speaker, when I proposed saving the homeless, especially at KOMTAR, I asked permission from JKM, but it was not allowed. But I asked the Chief Minister, who said Penang Fights COVID, everyone must be saved. Because we saved them, we placed them in the Caring Community Complex, fully supported by Tzu Chi. And we have shown evidence that we are capable of managing all of them. I asked the doctors, they did not want to give. I had to ask from the private sector, and the private sector came to help me. Dato' Deputy Speaker, the Penang JKM Department has also received an instruction, an instruction that we should no longer carry out any operations regarding the homeless because there is no place to put them. This is the problem which we are facing.

Gooi Hsiao LeungPKR · PHBukit TengahEN

Sungai Puyu, I also have a question regarding the homeless, and I am interested in the view from Sungai Puyu just now, Honourable Member, who said that even now, if there are homeless people, there is no place to accommodate them. Honourable Member, in Penang we do not have a care centre like Rumah Ehsan, or Rumah Desa Bina Diri, or Rumah Seri Kenangan, as in other states, which can help to act as a safe house or temporary protection, a shelter for the elderly or people who are homeless. There have been several cases in my area too, Honourable Member, where we hear from complaints or information conveyed by residents that there is someone homeless. Recently an Indian man, whom we helped, lived on the roadside, his whole leg, Honourable Member, was totally infected, yet he had no one to care for him. So of course, we asked. We asked for an ambulance to come and help, and also JKM. And I was informed by JKM that now in Penang we do not have a specific centre to accommodate these people. Usually what happens is we will ask for help from NGOs or private old folks' homes to help place them there. So I want to get the view of the Honourable Member, whether we, the State Government, or we, can apply to the Federal Government to set up a shelter or care centre for homeless people, especially for these elderly people. Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

Yes. Just now I said that one complex, namely the Penyayang Sinar Kasih Complex, will be built. It has been under construction since 2003 and will only be completed in 2023. That is a Federal Government project at SPS. The area there is six (6) hectares. So we have to wait. But the project carried out by the State Government at Jalan C.Y. Choy will be completed once they are given permission to resume work. Currently, according to the schedule, it is already about 100 days behind because of the MCO. I have confidence that this contractor is a young bumiputera company, that it has the capability, and I have confidence in him. I believe it will be completed here in 2022, because of weaknesses in the administrative system or methodology of the Federal Government. I, together with several ADUNs, am working with NGOs and MMC to set up a Penang Care Alliance. It was established on 16 July. The first meeting was on 16 of July and it was launched by the Chief Minister on 11 August. Now we will have four (4) sectors, namely mental health, because every 60 hours, or two and a half days, there is one report of a suicide case. Therefore, we obtained experts from all parties, whether from government hospitals, private hospitals, or people who have retired, to help, to give talks and so on. Everything has been prepared. Penang Care has also conducted courses for service centres. All service centres were invited to send one representative to this training session. But, I regret very much, Penaga did not send anyone and did not respond. Free. Permatang Berangan attended, but Penaga, sorry, there was none. We also have a programme for employment, because in this crisis many people have lost their jobs and are looking for work. Penang Care has worked together with SOCSO and other factories to collect information and also to carry out so-called matchmaking, especially for people from the tourism industry who do not have skills, and enterprises. We offer them training, we offer them matchmaking, and food and accommodation are also arranged, as was mentioned earlier as the safe house. There is indeed a safe house in SPT, but I cannot disclose it, because the safe house is used by my colleague, the Honourable Padang Lalang, to shelter cases of violence and so on. You know, I cannot say the location of the safe house, but food has also been arranged, and we have collected information on this. If we count the assistance from the Federal Government and the assistance from the State Government, it is sufficient. For MPT, hundreds of thousands, one box is RM100, including RM3,000 from the State Government. RM200 from 3 KADUN, so RM600. For Parliament, RM100, that is RM700, RM3,700 for one Parliament. Everything is sufficient. But we also feel very worried that it is not enough, because on the instructions of the Chief Minister, in every district we put 50 packets, which is not enough, so it was topped up by Mutiara Food Bank, which gave everything. What I regret is that although the State Government has taken steps to help, we are facing a difficulty. The EXCO has agreed that every quarantine home case must be reported to the District Office, because the DO is the Chairman of the Disaster Committee. The District Office, upon receiving information, will ask the Penghulu to hand it directly to the ADUN so that the ADUN can contact the families under home quarantine. What is needed, what can be helped? The State Government has done all this, but despite the instructions and requests from the State Government, we could not obtain the information. In SPU, however, everything was obtained. SPU received it. Other districts such as DTL, I understand, have none, and DBD has none. Why? Are they simply too busy, perhaps? Is this instruction not reaching down to the ground, perhaps? But I beg, I beg that this must be tackled, we must take care of the people who are really in difficulty. Right, Honourable Penaga? Right...(interruption)...

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Dato' Deputy Speaker, the Honourable Sungai Puyu. Regarding the quarantine of the community during the COVID-19 pandemic, at the same time as what was raised by the Honourable Bayan Lepas, namely the test of the flash flood on 18 August last year that occurred in Pulau Betong. We have faced this test, and at the same time there were families in quarantine. At the same time, this flash flood, among other things, is what we want to raise, as the Honourable Bayan Lepas raised, regarding assistance. As usual, the initial response is food assistance that we distribute. But as we are aware, there were urgent demands, namely furniture and also rubber mats and so on, and mattresses and so on were damaged. So I want to ask the Honourable Sungai Puyu to help in the affected areas, including Pulau Betong with 500 families. For the State Government to provide at least a one-off assistance to residents affected by the flash flood, and also to families who are in quarantine. That is the first question. I take this opportunity too, because I was not given the chance during the earlier debate. The second...(interruption)...

Deputy Speaker of the HouseEN

You must get permission from the Honourable Sungai Puyu, because the time of the Honourable Sungai Puyu has already exceeded, and it was already cut off earlier.

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Honourable Sungai Puyu, I request one more question, regarding the JKM office in Balik Pulau. I understand that near the JKM Office there is a CAT for dialysis. I understand its area will be expanded to include the JKM Office. I understand it will be moved to the upper floor of the City Council Complex in Balik Pulau. The area was originally 3,500 square feet, but when moved to the upper floor, the situation becomes a little smaller, 1,000 square feet, involving 30 staff capacity so...(interruption)... anxiety has arisen among the community because moving to the upper floor will make it difficult, among others for the OKU group since there is no lift, and also for the senior citizens who often visit the JKM Office. So this has become a problem in Balik Pulau. We hope that the government will consider which suitable place is still available for this JKM Office, so that it is convenient for the public to transact business as it is currently. So I request the Honourable Sungai Puyu to explain the developments regarding the relocation of the JKM office in Balik Pulau. Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

The JKM Office in Balik Pulau has been rented. The space was rented from MBPP, and MBPP will make the decision. Yes, there, but we have a CAT dialysis centre where, until now, we have 84 patients, and of these 70 patients are from DBD, and 9 patients are from DTL. It is indeed not enough. We have run 4 shifts and we will add more machines. JKM has searched for many places but could not find one suitable place. However, here we have given an assurance that efforts to safeguard the interests of OKU and senior citizens have been taken into account, where only half of the existing office, namely the half for administration, will be moved up to the top floor only. This issue was discussed during the EXCO Meeting, and there was an agreement from MBPP to give a bigger space for welfare to move upstairs. The meeting is ongoing and negotiations are ongoing. I am confident that this can be resolved. We chose the MBPP building in Balik Pulau because it has a community and public transport, and all of this has been taken into account. And possibly, I have to find a place for JKM, a building that is the same, but this is subject to land and to receiving an allocation for construction and so on. I assure you that services will not be affected because we will make efforts. So, Deputy Speaker of the House, I will end here with a word of thanks, especially to NGOs such as Tzu Chi, One Hope Foundation, Ji Sang and many more who have contributed to the community of the State of Penang that is facing this, because I dare to say here that 70% of the medical equipment used by health services comes from the public and the State Government to help health services that were delayed by the Federal Government. Therefore, I appeal to everyone to set aside politics, to unite together to fight COVID-19, stay safe everyone. Thank you, I request your support.

Deputy Speaker of the HouseEN

Thank you, Honourable Sungai Puyu. I invite the Honourable Datok Keramat to speak.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Dato' Deputy Speaker of the House. To all my colleagues, thank you for the many inputs given to the three portfolios under me: Housing, Local Government and Planning. I have noted what several honourable colleagues have asked, but what I want to focus on, mainly before I answer the questions, and perhaps those questions can be answered, is the opening message by Tun the first, on his behalf, in which there are many matters under my portfolios that he touched upon. Although that is so, we can see that Tun is up to date with the State of Penang and its developments in all sectors. First, I would like to quickly, I don't want to repeat too many, I have in several of my answers stated some facts that need to be made, because my portfolio involves many figures, so I ask for everyone's patience so that I can give a little. As Tun stated on page 21 of his message, we have a plan for 220,000 units of Affordable Housing, of which so far I have given a little detail. I'm just going to go very quickly on the number, Dato' Deputy Speaker of the House. We have reached 119,116, precisely, of the speech or message from Tun, of which we have Low-Cost Houses that have been completed, 38,190, those that are in various stages of construction, 19,640, and in planning, 61,286, which is very correct. So we will continue our efforts. 119,116 units represents 54%, 54.2%, of our target by 2030. We are more than 50%. We still have another almost 8 years to go, and we are confident this can be achieved, especially in the circumstances of the COVID-19 pandemic. I want to state to everyone here, for ten years when I was EXCO for Housing, we saw how I pleaded with developers to build Affordable Housing. It was very difficult. I always said, "don't put all your eggs in one basket," never do that, no one listened. But now the developers who built that come to the office pleading whether they can change the plan or not. Build one at RM1 million, cannot sell. Those who build at RM300,000, the people can breathe, and the developers too can breathe. See how things can change. Things can change overnight. Of course, this is two years now with COVID-19. And we see, Mr Speaker, I want to inform everyone, the only sector of housing that is moving without an overhang is affordable housing, and that is the way Penang wanted it to be. I don't want to thank COVID or anything, but it is reality, it is necessary. There was no foresight that there would be COVID-19, but we planned a long time ago and it is happening. Luckily we planned, there is some help, and I am confident. Therefore, we don't know how long COVID-19 will go on, but that is the reality, the fact on the ground in the housing sector. Developers cannot breathe, and the people cannot breathe either. Do not look at projects of RM300,000, RM400,000 and beyond. That is the reason why we brought the HOC down by another 10%, and we are looking into more ways to assist both sides. First of all, for me, what is important is the buyer, and then of course for the buyer to be assisted. We also have to look at the other side, the developer. So now we have one very good thing: we have the Penang State Housing Board (LPNPP) for the first time this year, timing... see the timing. Everything is falling into place for the Penang State Housing Board. Dato' Deputy Speaker, we have already made some plans. We have 14 projects that we have planned under LPNPP, namely nine are Affordable Housing developments and five are URC or redevelopment developments. I said this this morning, and we are going to start two, one each. One Affordable Housing at Bukit Gedung in Bayan Baru, I think, or Bayan Lepas, that side. The ready tender has been called and we will close it and hope that it can start. I will go with my Chief Minister at the end of this year for that first Affordable Housing by LPNPP in Bukit Gedong. It is going to happen, of course. Mahsuri is the second one, also going to happen. So these are our achievements in housing, in line with what Tun Yang Terutama stated in his message. That is his aspiration and what he wants to see Penang do, and I want to assure Tun that we are and will ensure this happens. Apart from this, we also have various projects such as rent-to-own. I do not want to repeat, but it is important because Tun also mentioned how difficult it is for the people to access loans and so on. So, this is one of the things he correctly pointed out again. So far we have 2,510 units at a price of RM120.00 up to RM200.00 per month payable to the board, and you get the house directly. 2,510 are ready, but there are many more being planned and almost ready, so we want to expedite this during this period. That is what I promised to Tun Yang Terutama, what the State Government will do. I also want to state to the ADUN for Penaga regarding housing, just very quickly, there is an issue about Majestic Heights. Very good question. In fact, Majestic Heights has several phases that were abandoned. That was the first project I rehabilitated, and the State Government rehabilitated it, where the abandoned Phase 1 project covers 375 units. What happened is that we have rehabilitated it, and all were able to be given units in Phase 1. But there are many other phases that could not be continued because their status is less than 10 or 15 per cent, so the cost to do it is too high. However, for the first phase, the status is almost complete, so we completed it and they have moved in, no issue. But what the State Government discussed with the developer is that overall we want to see whether they can help with more Affordable Housing, namely Affordable Housing priced at RM300,000.00 and below. In this regard, for everyone's information, including my colleague from Penaga, there is indeed one project that has been completed...(interruption)...

Deputy Yang di-Pertua NegeriEN

Honourable Datok Keramat, Pulau Betong has been waiting a long time, poor them.

Pulau Betong is where? Can I finish this part first on Majestic Heights?

Haji Mohd Tuah bin IsmailPKR · PHPulau Betong

Okey,teruskan.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

So, Majestic Heights, they are indeed continuing, because the question I found is what assistance will be given to the other buyers who could not get units because of the abandoned subsequent phases. What we have discussed and what is happening is that there are several phases for Affordable Housing that will be built by them. But of course, with the pandemic, we are thankful that before that, there was a project known as The Stone, for which in 2017 we also gave them planning permission, and so far 960 buyers have signed sale and purchase agreements. Of course, we will always discuss with all the original buyers for the earlier phases too, and now to see how we can help, because we have regular discussions with all parties. Maybe you want to say something, Pulau Betong?

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

I would like to congratulate Datok Keramat. The target set in Penang2030 is the provision of 220,000 units of Rumah Mampu Milik in the State of Penang. The current achievement is 100,916 units, which is 54.17%. Based on data from the Housing Information System, the total number of applicants for RMM A and B for Pulau Betong from 2008 to 2021 is 1241, namely 773 units of RMM A and 468 RMM B. Meanwhile, the latest waiting list for the Pulau Betong State Assembly constituency recorded 234 applications for RMM A. I would also like to bring up my question and draw attention of Datok Keramat to the residents of G-13 Jalan Baru Balik Pulau, which was raised by the Honourable Member of Parliament Dato' Muhammad Bakhtiar for Datok Keramat's attention in March last. These G-13 residents have received a notice to vacate their homes within 14 days after the final judgment date, which took place on 30 March 2001. Datok Keramat's consideration is very much hoped for with urgency, so that all these residents are given priority to obtain Rumah Mampu Milik in areas near them, because these residents are very much affected. So I request feedback from Datok Keramat regarding the matter raised by the Member of Parliament for Balik Pulau. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Honourable Member for Pulau Betong. Thank you for the very important question, because it will have an impact on the overall efforts we have across the state in all five districts. Just want to double check, which project is that?

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

G-13 Jalan Baru Balik Pulau.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Village housing scheme. Usually when a notice is issued by any developer regarding any development they will undertake, they must comply with the guidelines that we have already established, I think nearly six (6) or seven (7) years now, where we have minimum standards on how compensation must be given to them, how they must be relocated and so on, and we will ensure that this happens if there are any applications made to the State Government at the State Planning Committee level. We will look into that. That will definitely be done. Number two, most importantly, I totally agree with Pulau Betong: priority will always be given to them, to the local areas. Whatever development takes place on our selection list, where we hold meetings every month in which many of my state representatives are present, they know that among the priorities given are those who need to move. That is one of the main priorities that we give; it is always number one on the list. Of course, in addition, we will always receive, as we have done for so long, views from especially all state representatives. They will give views to the committee and we will take note. That is the most important, so I think what you have said is very important for everyone to understand. If there is any development anywhere, and if there are projects in places near the site to be developed, priority will be given to number one, local people, and also number two, those who are recommended by the ADUN. The ADUN is always number one; we always take into account what is stated and recommended by the ADUN. Of course we must continue the process, and there are conditions that must be complied with, because our waiting list is also long. If each project has 100 or 200, but the village to be developed has 500, don't forget there are 2,000 more in that district still waiting, perhaps for a long time. So that is why we have to strike a balance, and that is our job, and we will look into it, but yours are always given a priority. Thank you very much for that point.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Excuse me for interrupting. Thank you, Deputy Speaker, and thank you, Datok Keramat, for the explanation just now. On housing issues. I would just like to refer to the answer to my written question number 10 regarding the total number of housing projects being built in the Tasik Gelugor area. Based on the answer at number 10 (B), there are seven (7) housing projects under construction in Tasik Gelugor offering a total of 3624 housing units. After examining all seven of these projects, of the total 3624 housing units, those priced above RM250,000 number 3322 units, with only 302 units remaining priced below RM250,000. As we know, the Permatang Berangan area is a suburban area that needs many more Rumah Mampu Milik priced below RM250,000. Perhaps I would like to ask Datok Keramat's view on whether there are other areas that can be developed with affordable housing for people in the low-income group. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you to the Honourable Member for Permatang Berangan. This is a very important question, which again will involve all places and areas. I would like to state our efforts in developing housing in Penang, an effort that is not static. It is an effort that is alive, which means it is always moving. Yes, perhaps the number just mentioned, I can check the question later if there is a need for more housing below RM200,000. We will always look at it to ensure it is done, because any development is also still subject to a percentage of Rumah Kos Rendah and Rumah Kos Sederhana Rendah that must be built. So we will ensure that happens. In Penang I would like to remind everyone that we still hold to the prices of RM42,000 and RM72,500 for Rumah Kos Rendah and Rumah Kos Sederhana Rendah. In fact, for your information, Honourable Member, I am so happy to note that on the Seberang side we have Rumah Kos Rendah at RM42,000, two (2) storeys, at Scientex with a car park at a price of RM72,500, which was launched by my own Chief Minister. That is the latest, so if possible, do it, especially on the Seberang side.

If there is land, we are looking into that, we are really looking into that. I wish we could do that on Penang Island, but we are also looking into that here, because that is an example for Penang. Never have we seen such a development. But I give assurance of my commitment to the Honourable Member for Permatang Berangan that we will continue our efforts. Of course, the more we can get, the better. In fact, there are developments now. As I said, I don't want to thank COVID-19, but because they cannot sell, some of them have not given 30 per cent, and some have given more than 30% so that they can breathe. So let's see how it goes, we are working on it. There are one or two projects already happening with more than 30 percent.

Nor Hafizah Binti OthmanUMNO · BNPermatang Berangan

Terima kasih Datok Keramat. Please look into it.

Saya teruskan Dato' Timbalan Speaker, very quick one I think I more less covered my housing, already covered penyelenggaraan this morning with the pricing what we have spend, what we asking with the federal government, HOC I have covered, of course incentive housing both side buyer and developer. I will go now to one important thing before I end. I will go to PlanMalaysia perancangan the quick one just a couple things because ada disebut di dalam ucapan Tuan Yang Di-Pertua dan I would like all my Yang Berhormat to be with me here today. Now this morning saya ada sentuh tentang Gurney Wharf saya tak mahu sentuh lagi details sudah saya berikan tapi Gurney Wharf yang mana hampir 131 acre lah yang akan diserahkan kepada Kerajaan, sudahpun diserahkan untuk projek tersebut. Disebut secara khusus oleh Tuan Yang Terutama, we will continue with it, the reason why I’m bringing this up is because we are very in advanced state, saya hendak nyatakan lah ini adalah masterplan terkini pada 21 Ogos 2021 kita ada satu mesyuarat ataupun awal Ogos and the, this is in relation to very specific details berkenaan hawker centre kita akan pindah astaka daripada Gurney Drive kepada Gurney Wharf, kita akan ada sekarang 157 gerai dalam astaka, lebih daripada apa yang ada, bukan begitu banyak lebih, but more, kerana kita nak menampung mereka yang memerlukan, ada banyak, ramai di persisiran jalan dan sebagainya we want to assist them, like there are many questions that been asked by all my YB., how do we help pengerai kecil during COVID-19. The answer is very simple, I just refer to this as a gambaran besar untuk semua soalan yang saya terima. Kita akan cari tempat untuk tempatkan mereka semula, bukan sahaja di sini yang baru tetapi yang sedia ada kita ada ratusan dan kita sedang buat kerja untuk bantu mereka and this includes the Gurney Wharf that is going to come about, kita juga ada mobile kiosk iaitu bukan gerai tetapi mobile kiosk, boleh jual makan for our simple nasi lemak seller on the street, always get saman, get notice for what, kita hendak bantu mereka. Kiosk pun kita ada, banyak yang kita hendak pastikan ada dan kita juga ada pelbagai kemudahan lain. I think seperti mana saya nyatakan tadi ada open carpark untuk bantu dari segi saliran trafik there is also part and parcel of our planning and there is of course all the kemudahan yang lain. Why am I raising this Dato’ Speaker…because that is one important thing in Tun's speech, at paragraph 40 or rather that is generally on Gurney Wharf, but I want to refer everybody, we have the speech, kepada mukasurat 36 iaitu perenggan 67 kalau ada semua. Kerana ini akan melibatkan semua kita di sini, ia adalah berkenaan ayat ini yang diutuskan beliau dan saya baca. Middle of the paragraph, or I can read the whole thing, second sentence “…justeru saya amat berharap supaya Kerajaan Negeri dapat meneruskan idea yang telah dibangkitkan di dalam Dewan yang mulia ini pada 2015 sejauh itu dan juga 2019 yang lalu untuk mendirikan Dewan, bangunan Dewan Undangan Negeri Pulau Pinang yang baru…”. We all remember that you would definitely remember that Dato’ Speaker, all my friends here, semua YB. akan tak boleh lupa lah ini first time speech dia, dia sudah nyatakan ini, “…semoga dengan wujudnya bangunan yang baru, fungsi dan keberkesanan Dewan Undangan Negeri

dan Jawatankuasa-Jawatankuasanya dibawahnya dapat dipertingkatkan dan akan menjadi mercu tanda kemegahan rakyat dan Negeri dalam mendokong sistem demokrasi di negara kita…”. So why did I bring this up? Ini tanah sudahpun ditambak, siap, mungkin ada kawasan di situ yang kita boleh pertimbangkan untuk didirikan Dewan Undangan Negeri yang baru. Siapa sokong di sini? [Ahli-ahli Dewan Undangan menepuk meja]

Ada? Ini Tun mahu dengar, dia sedang lihat. Tapi bukan di situ sahaja. Saya ada banyak cadangan lain juga yang mana saya boleh beri kepada semua rakan saya and then kita lihat lah sama ada kita hendak, apa yang hendak dipilih, some of them basically are not ready but in the pipeline kita ada seperti mana semua maklum PSR, 4,500 acre bakal ditambak di bahagian selatan boleh dipertimbangkan suatu hari. But that would probably be 10 to 15 years time. If you go to Gurney Wharf, it can happen next year because it is ready. Kita ada dua (2) water body di situ hampir 15 acres very very nice but of course we have to see whether it can be done or not. I’m just giving suggestion to answer Tun, because let’s have a bigger picture, all of us are involve in this, so you need to let me know, so that I would let Tun know, we also have on the other side of the Penang, don’t forget Penang seperti mana Ketua Menteri saya selalu nyatakan, the future of Penang is in Seberang. Seberang pun kita ada banyak program tebus guna, of course Timbalan Speaker juga dari Seberang mungkin ada prejudis sikit tetapi it’s okay we take things into account, of course we know another very big programme there nearly 1,600 acre, and of course this all will take time, but if really we want to there is another one on the Island as well, we have the rehabilitasi Jelutong, Tapak Pelupusan Sampah Jelutong, this can happen from our discussion maybe in 5 to 10 years completed. That happens on the Island actually got two, one ready, one in about 5 years to 10 years at least, and then of course PSI that is about 10 to 20 years at least and then you got Rayston on the other side and that is about 10 to 20 years also. So we have got a lot of opportunities, ada banyak tempat, saya harap semua wakil rakyat dapat beri sedikit maklumat kerana ini adalah permintaan daripada Tun kita sendiri. Sebagai T.Y.T pada kali pertama beliau berucap, dia kata itu yang terpenting dan dia berakhir perutusannya dengan menyatakan itu. Jadi itulah dalam minda dia penting. So I hope all can look into it, there is a reason why it is raised any questions or any pandangan daripada rakan-rakan saya kalau ada? Dato’ daripada Sungai Udang, Sungai Dua, thank you.

Thank you, Datok Keramat. I think in terms of what was raised about preparing to build a new State Legislative Assembly building, I very, very much agree, and we need to look at a suitable place that we can propose immediately. I request the State Government to arrange a programme for immediate implementation, and the place is up to... I think if it is at Gurney Wharf, that is also nice, isn't it. The place is ready. Very fast, find a place that is ready. Because perhaps if it is at PSR, it may not even be in time. You have to wait… Not even in time, I think. So I just want to raise two or three things so that they can be recorded.

First, regarding PPR, I want to raise again that PPR houses are quite important, because many people cannot afford and need PPR houses, and we feel PPR houses are no longer sufficient for rent by these people who cannot afford them. I think there was an acknowledgement from Datok Keramat's side during engagement that the State Government would implement the building of PPR houses. So I hope we can continue, and I will try to discuss with this new Minister so that we can discuss together, so that we can reach a decision to build PPR houses in every district.

Second, regarding the quota for RMM A and B. So I just want to get a little answer from this question, the written question. Its breakdown: RMM A, Bumiputera 50%, Chinese and others 35%, Indian 15%. RMM B, 30% Malay Bumiputera, Chinese and others 55%, Indian 15%. And RMM C is the same as RMM B, but if possible for areas with a Malay Bumiputera majority, if possible increase RMM B, because at Scientex itself I see many Malay buyers who are interested and come to fill in the forms. That is one. So perhaps we can consider increasing the Bumiputera quota in these Malay-majority areas to 50%, perhaps.

Third, regarding rent to own. I proposed in my speech that it be increased from 10% to 30%. If possible, please consider 30%. And if there was a proposal just now to add rent to own, I think this really aligns with the recommendation of T.Y.T Tun himself, who wanted more rent-to-own houses. Another thing, regarding RT, Rancangan Tempatan: if possible, the objections that were made can also be reviewed in the RT of MBSP, because I submitted many objections. Also, in terms of the difference between what I raised just now: why is there a breakdown in RS but not in RT? What I understand is that RT is the detail of RS, and I see the development of Bagan Ajam is not in RT, so I question why it is not in Rancangan Tempatan but is in RS. Likewise, traditional villages to be developed into planned development are in RS, and are included in RT, but in RS I do not see the villages whose construction plans are to be changed. So I think that is all for now. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you to my colleague from Sungai Dua, who always states very precise questions.

Deputy Speaker of the HouseEN

Honourable Datok Keramat, it has been half an hour. I am giving only 20 minutes.

Pertama sekali.. Owh, sorry, I’m on my last. Just give me about five minutes, im on the last portfolio, KT, I finished two but then I can’t answer the plan now because of the question Dato’ Sungai Dua ingin saya nyatakan berkenaan RT dan apa yang disebut tadi ada perkara dalam RT yang tidak ikut RSN. Kalau ada, saya ingat masih ada ruang kerana kita hampir habis ataupun sudah habis I think this month we are going to finish for Seberang Perai RT di mana kedua-dua kita adalah dalam deraf akhir RT SP dan RT Pulau Pinang and we anticipate December kalau boleh untuk diwartakan but it is draft akhir, so ialah deraf, cepat-cepat kalau ada apa-apa untuk maklum, maklum, kita akan pastikan ia dimasukkan untuk pertimbangan. Untuk makluman semua, untuk kedua-dua RT kita sudah terima hampir lebih daripada 5,000 bantahan, yang terbesar daripada Seberang Perai Utara, 4,700 something. I don’t have the exact number but it is the highest so we are taking into consideration and we would of course try to accommodate kalau belum diambil pertimbangan dan ada keperluan untuk menyelaraskan, have to, you are right, RSN is the yang payung, so the rest is the detail which have to ikut, so we have to ensure that there is penyelarasan, so that one is no issue please come forward we are agreeable to assist you. Going back to another issue on kita punya ada percentage daripada dari segi perkauman dalam pengagihan perumahan RMM A dan B, itu adalah satu keperluan di bawah RSN, saya telah nyatakan sebelum ini and I think ini telah dibangkitkan sebelum ini dan kita faham, kita terikat dan di pemilihan seluruh pasukan kita perlu terikat and go through what is diperuntukkan di bawah RSN kerana RSN-Rancangan

Struktur Negeri ada kuasa perundangan so kalau kita tidak ikut itu bermaksud kita tak ikut undang-undang so we cannot just overwrite tetapi Dato’ sebelum tu kita mungkin kaji sama ada dalam RSN nak buat pindaan terhadap itu, buat sedikit kelonggaran case by case basis atau apa which we are thinking about, kita telah ambil beberapa case ke Kerajaan Negeri, untuk menjawab soalan Dato’ YB. Sungai Dua. In fact, one or two cases Dato’ already done di mana populasi dia dari kaum lebih banyak tak boleh dapat yang lain untuk fit in the percentage it work both ways, bukan kawasan yang ramai Melayu atau bumi atau ada kawasan yang ramai Cina, same thing, it can work both ways, but you must understand at the end of the day the RSN objektif mereka hari ini dari tahun 2007 adalah supaya kita dapat memajmukkan penduduk tempatan supaya semua ada. That is the whole idea, so we have to balance out again, so when we discuss when we kaji these are the factors that we are looking into. Dato’ Speaker, itu saja yang saya hendak nyatakan ada satu…(gangguan). One minute, one minute, let me finish Dato’ Sungai Dua first…

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Pardon me, Datok Keramat.

Deputy Speaker of the HouseEN

I am giving you only two (2) more minutes, Datok Keramat.

Got my KT ya, very fast, very COVID-19, KT very important, some numbers, but just Dato’ another very important. PPR, of course sekarang kita PPR adalah kaedah di mana kita hendak sewa untuk rakyat tapi kita alih kepada RTO supaya mereka pada akhir hayat itu boleh milik, so we are looking into that as you know it is 10 percent now. I know Sungai Dua has mentioned, you want to go to 30 percent, very good idea and I tell you what, kalau kita boleh cecah 10 percent and I’m confident, yakin itu then I would suggest. Let us do one thing at a time, kita sampai 10% saya akan contact Dato’ bagitau then we will decide berapa lagi percent kita akan teruskan. No issues. Okey, saya terus kepada Kerajan Tempatan. Saya ingin nyatakan of course keseluruhan perbincangan kita adalah berkenaan COVID-19. Keutamaan Negeri Pulau Pinang keselamatan awam, keselamatan kesihatan, saya nyatakan selalu. I’m very happy semua Yang Berhormat kita telah melibatkan diri dalam program kita untuk di peringkat negeri untuk lawan COVID-19. Yang pertama, Penang Saring COVID-19. Thank you so much for all your assistance to all my friends, my brothers, and sisters here. Tak boleh berlaku tanpa bantuan kamu semua. Now kalau kita lihat pada number yang kita hendak capai ia adalah 40,000, di satu kawasan DUN 1,000. For your information, kita telah dapati dalam program itu jumlah pendaftaran yang termuktamad 46,875. Melepasi sasaran kita, dan daripada itu semua telah pun dapat saringan yang datang 40,000 warganegara 90.62%. 90.62%, just to let you all have a understanding although we know that warganegara is the yang pertama contributor kan 70 percent but they don’t want to come, mungkin dia takut, that is the issue there, number one. Bukan warganegara was only 9.38% Dato’, and the percentage in terms of berapa yang positif dan negatif kita lihat yang negatif cuma 6% keseluruhan dan yang positif 6.6% yang negatif the balance 93.4% and for your information kita terus akan teruskan kaji sama ada perlu atau tidak. Saya ingat saya dengar banyak YB. saya tanya sama ada ini akan diteruskan atau tidak, of course just now Air Putih pun ada nyatakan perlu bantuan daripada Pusat ada banyak soalan pada beliau but at Penang we are looking into it.

Ketua Menteri saya telah minta saya kaji, kita akan lihat. But like I said, vaccination first. Let’s try to complete that. In the meantime, we look into whether we want to continue and there was a question just now which is right to the point, saringan ini tidak boleh berhenti ia perlu dilakukan berkala walaupun kita sudahpun divaksin dua (2) kali so this very importance for us to study. Number dua and the last one Dato’, one more programme yang akan berakhir pada petang ini dalam satu jam Program Mobile Vaksinasi untuk peniaga dan penjaja. Tadi Air Putih pun ada nyatakan penting untuk kita lihat pada kategori orang warga emas dan juga peniaga-peniaga, itulah program kita. Pulau Pinang sendiri dah keluarkan 11,000 vaksin untuk para-para penjaja itu dan kita hendak lihat setakat semalam, 8,280 telah divaksin di bawah program ini di lima (5) daerah yang bermula pada 30 haribulan Ogos untuk empat (4) hari sehingga hari ini, 2 haribulan September. Kita ada baki semalam, 2,730. Setakat pukul 3.00 tadi, saya nampak kita sudah sampai 1,500 and I think by 5.30 it will complete. That means we will have 100 percent, for the last two days it has been 100 percent. This also we will look into how we can assist, but again the vaccination was assisted and given by the Federal government. We want the Federal government to assist to give us more so that we can go for the second dose because this guys came for first dose under us but it was a collaboration with KPKT, dengan kata-kata itu....(gangguan).

Deputy Speaker of the HouseEN

Thank you, Datok Keramat, and so on.

Thank you very much.

Deputy Speaker of the HouseEN

The Honourable Chief Minister has something to say.

Y.A.B. Chief Minister: Mr Speaker, in accordance with Rule 6A(1) of the Rules of Procedure of the Penang State Legislative Assembly, I request that today's sitting be extended until 6.30 p.m.

Deputy Speaker of the House

Ada sokongan?

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

I beg to second the motion.

Deputy Speaker of the HouseEN

Honourable Members, the Honourable Chief Minister has announced a motion under Rule 6A(1) to extend the duration of today's sitting, Thursday, 2 September 2021, until 6.30 p.m. Honourable Members who agree, say 'Yes'.

State Assembly Members:

'Yes'

Deputy Speaker of the HouseEN

Honourable Members who do not agree, say 'No'. The majority agree. The motion is carried. Unanimously.

The floor is given to Padang Lalang.

Chong EngDAP · PHPadang LalangEN

Thank you, Mr Speaker. First, I would like to thank all parties who have consistently stood with the Penang State Government in efforts to empower women economically and in leadership, and to nurture safe families and social harmony in this state. Although we are still facing the COVID-19 pandemic, the State Government remains committed to holding various programmes and policies for the development of women and families through the Penang Women's Development Corporation (Perbadanan Pembangunan Wanita Pulau Pinang), or PWDC, and online programmes on unity and harmony through the Penang Harmoni Corporation Sdn Bhd, or HARMONICO. I thank Tuan T.Y.T for expressing pride in the achievements of the Penang State Government in driving the development of women in leadership and women's representation in the economy in Penang. I would also like to take this opportunity to record my congratulations to YB. Senator Puan Lim Hui Ying and YB. Senator Puan Fadhlina Sidek as Members of the Dewan Negara representing the State of Penang. I believe both senators are able to take steps to bring a more comprehensive perspective, based on the principle that different groups have different needs, so that no one is left behind. The Harvard Business Review in 2020 said that women and men have different leadership styles, where women are more efficient in communication and men are more inclined to form strategic perspectives. Therefore, if given the opportunity and platform, both women and men can work together to form a more perfect leadership model. With the aim of increasing platforms to discover women's talent in leadership and, in turn, increasing women's representation at decision-making levels, especially in the field of politics, the Government through PWDC has established the Women's Sitting (Sidang Wanita) project and the Women and Family Development Committee (Jawatankuasa Pembangunan Wanita dan Keluarga), or JPWK. Throughout Malaysia, only Penang has the Women's Sitting project and JPWK. There is none elsewhere, yes. Only in Penang. Both of these projects are to provide a platform for women. The Women's Sitting project was also mentioned by His Excellency in his speech. So, the Women's Sitting 2021 will be held online this year, and this year, because it is online, there are 14 participants from outside states such as Kuala Lumpur, Selangor, Putrajaya, Kedah and also Terengganu. So, perhaps in the coming years we can hold a women's mini-Parliament in Penang. I would like to take this opportunity to record my appreciation to Dato' Yang di-Pertua, who is the main catalyst of the Women's Sitting by providing sound advice and facilities so that the Women's Sitting could run smoothly. My thanks also go to the Honourable Chief Minister, the EXCO team, and YB.-YB., Telok Air Tawar, Permatang Pasir, Berapit, Machang Bubuk, Bukit Tambun, Pengkalan Kota, Sungai Pinang, Seri Delima, Air Itam and Batu Uban, Member of Parliament for Batu Kawan

and the Coordinating Officer of KADUN Penaga, who contributed and gave strong support in making the Women's Sitting Programme a success. Thank you to the ADUN for Seri Delima, who supports the agenda of Top-Up Women-Only Additional Seats, or TWOAS. To inform this august House, almost all ADUNs understand the importance, diversity and inclusiveness (with permission)... diversity and inclusiveness in producing decisions that are perfect and beneficial to all levels of society. The TWOAS initiative is a temporary measure or temporary measures to close the gender gap in the political arena. This system ensures at least 30% women's representation in the State Legislative Assembly through appointed members if needed. In other words, this system will only be implemented if the percentage of women ADUNs is less than 30%. However, I would like to emphasise here that women representatives under this system will be selected from among those who are qualified. This means they must have backgrounds that show their ability to fight for the rights of the people, especially women and children. To date, the TWOAS working committee has held 20 Engagement Sessions with stakeholders including ADUNs, Members of Parliament, councillors, political parties, NGOs and the public to obtain feedback in order to improve this initiative. The input and feedback obtained through these Engagement Sessions are used to strengthen and consolidate the implementation of TWOAS in the State of Penang. The support received has been very encouraging from every group of stakeholders, whether from politicians or from NGOs and the public. Although facing constraints in organising programmes due to the Movement Control Order (Perintah Kawalan Pergerakan), JPWK remains committed to carrying out programmes focused on this COVID-19 pandemic. Up to 10 August 2021, JPWK has carried out 344 activities involving women and families who have lost their livelihoods by providing online workshops so that they are exposed to financial and online business management. In addition, parenting skills activities, including online education programmes and seminars on family topics, are held to encourage them to spend quality time with their children and to provide exposure in facing the challenge of family burnout. Mental health management activities have also been organised to help those who are experiencing stress from being confined at home for too long and other problems they face. As said by the representative for Sungai Pinang, social problems such as domestic violence must be stopped entirely. Based on data from the Royal Malaysia Police, a total of 304 cases of domestic violence were reported from January to July this year, compared with 192 cases in the same period last year. This shows an increase of 58% from last year. Very worrying data. Therefore, in July 2020, as a response to the increase in domestic violence cases, the State Government launched the First Support Point under the Safe Family Policy to provide immediate assistance to victims of domestic violence. This initiative is also aimed at preventing the increase in domestic violence cases since the MCO 1.0. Up to now, 29 ADUN Service Centres and 12 non-governmental organisations have been recognised as First Support Point operators. From March 2021 to July 2021, there were 81 cases received and handled by the First Support Point. I agree with the representative for YB. Sungai Pinang and Pengkalan Kota that the handling of this social problem should not be divided between the government and the opposition. All representatives at KADUN, all people's representatives, must be involved in setting up a First Support Point in their respective KADUN. Recently, YB. ADUN Batu Lancang, whom I would like to praise because she has succeeded in helping a victim of violence who had been abused by

her own father. She accompanied the victim to make a police report and looked for a temporary shelter for the victim. Ini ini... (interruption).

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Permission to interject.

Chong EngDAP · PHPadang LalangEN

This is from a victim who is from Bayan Lepas. She helped YB. Bayan Lepas. Right?

Azrul Mahathir Bin AzizAMANAH · PHBayan Lepas

Okey betul

Chong EngDAP · PHPadang Lalang

Betul?

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Padang Lalang, on this occasion I also extend my millions of thanks to the ADUN for Batu Lancang for helping to handle the abuse issue, because at that time there was a flash flood and I really could not handle this issue. Thank you very much.

Chong EngDAP · PHPadang LalangEN

Yes, thank you. The intervention of ADUNs is very important in combating this social problem because people's representatives are also responsible for helping and protecting the people in their areas. If more ADUNs could act, yes, like Batu Lancang, I think cases of violence can be addressed, but I, I still face the problem that I cannot, I don't know what to do, how to help in cases of domestic violence. For example, a victim asked me to accompany her to negotiate with her husband because she wanted, she wanted a divorce, but the husband did not want it. So I, I have also consulted several male YBs on what they would do if they faced this kind of problem, yes, and among them someone told me, "You must find a man to negotiate," and I think this is perhaps, we will set up a committee to deal with problems like this, yes, so that male YBs can help, the Speaker can also help. This is so that everyone knows that violence against family members is wrong both legally and morally. One must not be violent towards anyone, especially family members. So we must run a campaign to disseminate messages like this. And I think I can get the support of all Members here. Right, yes? So I also agree with YB. Sungai Pinang that the implementation of policy alone cannot solve the issue of domestic violence in the short term. We need a long-term, long-term campaign. So I hope that after this, after this House, I will hold a campaign to invite RIBI, or religious organisation leaders or employers, to implement Safe Family in their workplaces, and I hope all parties can respond well.

So I would like to thank several NGOs that have been involved in helping us to prepare or implement this Safe Family, such as The Safe Harbour, religious organisations, St. Anne's Church and educational institutions Wesley Methodist School Penang International, Agape, WCC, Sneham and many others. But what is most important is the ADUNs, intervention of ADUN is very effective because if ordinary people only go to the police station, perhaps it may not have such an effective impact, yes, but if the ADUN goes there, I think many problems can be solved. Yes.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Yang di-Pertua, I want to comment briefly on this domestic violence because I think three (3) months ago a woman came to my office in a wheelchair, with no legs, she was indeed amputated due to diabetes, came. She came to complain that her husband was beating her at home, and I contacted the chairman of MPKK, the secretary of MPKK in the same block who indeed admitted there were cases like this. I, okay, I said, she said she wanted a temporary place. I, I booked one room in one budget hotel, budget hotel, sent her there so that her husband could not find her, right. She said she wanted to get out of that area. Within 12 hours her husband had already gone to the budget hotel, and she also slept at that budget hotel. The next day when she came, she had already made up again. After that, the wife came back to me and she said, again complaining that I was beaten. Then that day what happened. That day she apologised, today she did it again. So, this one Dato' Speaker, it will become a problem that if we keep, what is this, if left to us the ADUN forever we have to book hotels to solve issues like this. So there must also be a policy that if domestic violence, say the husband to the wife or wife to husband beats, they, they must be taken, another thing is that the wife does not want to make a police report against her husband...(interruption). She said he is good, but only when he drinks alcohol does he become like this, so how can we solve this problem.

Speaker (Speaker)

Okay we leave it to pakar

Satees A/L MuniandyDAP · PHBagan Dalam

I think if leave it to the ADUN we will face problems every day. Semua masalah akan datang cari kami. Thank you.

Chong EngDAP · PHPadang LalangEN

Yes, this is a problem that the police often face too. Today she makes a police report, tomorrow or later she withdraws it. This is a really big problem. But usually we advise the victim that she must be counselled or she must have intervention. If there is no intervention, she will often cycle, this cycle will repeat, that is, today they quarrel, he beats her, then later he will ask for forgiveness and say everything sweetly and make all kinds of promises, but after that it will happen again. And if there is no intervention, the violence will increase until it may even cost lives. So we must tell...(interruption).

Speaker (Speaker)EN

Honourable Member, the time is up...

Chong EngDAP · PHPadang LalangEN

Okay, also tell the victim, and I also tell her to be careful if you want to, you want to arrange, yes, a place for her, especially a male ADUN for a female victim, bring a third person, and it is also better if it is a woman, so that she does not become an issue for her husband. Her husband may accuse her of all sorts of things. So it is better for the ADUN himself to inform the police too. What you want to do, what you want to help because it can become an issue. Okay, so I think during this pandemic, PWDC also has several programmes to help families or women, single mothers affected by COVID-19. For example, the Single Mothers' Business Support Project, the Women Earn Income Programme 2021, and also the Women Entrepreneur Mentor Programme continues, and another one that the State Government has implemented as a response to COVID-19 is support for initiatives or programmes or support for online learning, e-learning programme, because we found that...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Yang di-Pertua, I apologise.

Chong EngDAP · PHPadang LalangEN

...about 36%. Let me finish this. Students do not have devices, do not have tools, let me finish this, students do not have devices, no computer equipment. If there is no computer or any other tool, e-learning is not possible. So the Government has taken the initiative to cooperate with several parties to obtain used or new devices to be given to students from poor families. For last year, a total of 749 computers were repaired and 97 computers were given to selected students and schools, while 438 computers were loaned to students who needed them. For this year, we, in cooperation with the Malaysia Semiconductor Industry Association (MSIA), have managed to provide a total of 1,552 laptops to students from the B40 group in the State of Penang. So, we hope, just now I know YB. Bagan Dalam is also already there, have raised the question where the computers are supposed to come from, the Federal Government, so I also ask that the Federal Government be transparent, yes, to tell how many computers have arrived in Penang, to which schools and how many for each school? This is so that we will know who has got the computers and who does not have any.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Yang di-Pertua, thank you. Padang Lalang, actually I want to ask before going into this e-learning issue. Dato' Yang di-Pertua, Penang is the first state to announce that a pregnant woman will get 90 days of leave, maternity leave, yes. But I have only just learnt that there are two standards within this leave itself. This is only for permanent State Government employees or Contract of Service staff who get 90 days. My Pegawai Seranta, my PA who has just given birth, when she asked the SUK, he said it does not include Pegawai Seranta who work under Contract for Service. Why are there two standards in our state where the 90 days, why? Are these women's burdens less than those women's? Why is there a double standard? So if I may ask, please harmonise it. Everyone must get it, all women who work in the State Government, State Government agencies, whether it is Contract of Service, Contract for Service, permanent, all must get 90 days. I really want to raise this issue during my debate, I could not, so I ask YB. EXCO to pay attention to this issue. Thank you.

Chong EngDAP · PHPadang LalangEN

Okay, this is a good issue. Previously, those on Service of Contract or Contract of Service did not get any benefits at all. This is after we raised it in the EXCO, and all EXCO members were of the view that at least they should get 60 days' leave as before, but we can see how, because there are guidelines to guide what kind of scope and benefits they can enjoy, it is in the terms and conditions.

Satees A/L MuniandyDAP · PHBagan DalamEN

But it shows an injustice. So I ask that it be harmonised if possible, State Government. Thank you.

Chong EngDAP · PHPadang LalangEN

I also agree. Okay, so I want to inform the Honourable Members here that now we have one GLC called HARMONICO, Penang Harmoni Corporation Sdn. Bhd., and we have several programmes, and we will increase the programmes, and its programmes may be with celebrating, to celebrate the festival, and also carrying messages such as "Sayangi Keluarga, Jangan Ganas Ahli-Ahli Keluarga", it combines these two...(interruption).

Speaker (Speaker)EN

Please, Padang Lalang, make a summary.

Chong EngDAP · PHPadang LalangEN

So, finally, I want to extend my highest appreciation and thanks for the concern, views, criticism and continuous support of the Honourable Members. Let us together join hands in tackling the spread of the COVID-19 outbreak. So, observe the SOPs and take care of yourselves. That is all, thank you. I beg to support.

Speaker (Speaker)EN

Thank you, Padang Lalang. I now invite the Honourable Member for Perai, please.

Thank you, Dato' Speaker. So I do not want to touch on the debate. I go straight to the questions; I have several questions that I need to answer.

Speaker (Speaker)

Cantik.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

To the Honourable Member for Berapit: the Honourable Member for Berapit's first question asks that the State Government set up a trained team to assist individuals who have lost their jobs. The State Government, through the Labour Market Sector Working Committee under the Penang Socio Economic Recovery Consultative Council (PSERCC), has identified strengthening the role of the Penang Career Asistance and Talent Centre (Penang CAT) in job matching as one of the strategies to address the challenges currently faced by the labour market in Penang. Following that, the Penang CAT Centre has implemented various initiatives to help Penang residents who lost their jobs due to the COVID-19 pandemic, such as job matching (job matching) and also a series of webinars in which representatives from industry such as Micron, Clarivate, Keysight and Vitrox share information on new job opportunities and also tips on career advancement with job seekers. In addition, individuals who have lost their jobs and apply for the Employment Insurance Scheme from the Social Security Organisation (PERKESO) will automatically receive an ID for My Future Jobs, PERKESO's official job portal, and a caseworker will be assigned to manage each job seeker's application. However, I am pleased to report that, based on investments approved in the manufacturing sector in Penang from January 2020 to March 2021, an estimated 15,596 job opportunities will be created in Penang in stages over the next three (3) to five (5) years. The State Government will continue to cooperate with other agencies through InvestPenang in efforts to promote and attract investment, whether from new investors or additional investment from existing investors, as well as assist the development of local Small and Medium Industries (IKS) to create more job opportunities for the people of Penang.

The Honourable Member for Sungai Dua asked about the achievements of the human capital development programmes that have been implemented and the participation of rural residents in those programmes. For the Honourable Member's information, in 2020, up to 775 students took part in programmes at the Penang Skills Development Centre, namely PSDC, in programmes such as the following: Malaysian Skills Diploma and Certificate, Engineering Diploma and Certificate, Industrial Skills Enhancement Programme and the German Dual Vocational Training (GDVT) Programme, where the employment rate of participants in these programmes and courses in the labour market is 100%. Meanwhile, the Northern Corridor Implementation Authority (NCIA) has implemented the following human capital development programmes: for a total of 4691 participants in 2020, the NCER Talent Enhancement Programme (NTEP), the empowerNCER Programme and the JomKerja@NCER Programme. The human capital development programmes run by PSDC and NCIA have achieved results such as improved employability and providing job opportunities to unemployed graduates, retrenched workers and school leavers, through collaboration with the private sector, including those from rural areas. For the Honourable Member's information as well, I have often stressed the importance of giving priority to the participation of rural residents in programmes organised under the Human Capital Development Committee of the MMK, so that more opportunities can be offered to this group.

The third question relates to the Honourable Member for Sungai Dua. Regarding, asking about the effectiveness of PdPR, namely Teaching and Learning at Home, and the performance of students who follow PdPR. It is indeed undeniable that face-to-face learning is more effective. However, in the current pandemic situation, the effectiveness of PdPR is seen as rather satisfactory, given that teachers and students fully use technology that suits the instincts of the present generation, where various information can be accessed through audio and video. In addition, according to periodic monitoring by the Penang State Education Department, student attendance in PdPR classes is also at a high level, namely over 91%. Meanwhile, the Classroom Assessment (PBD) conducted in June 2021 shows that the percentage of primary school pupils who have mastered the minimum learning level for Bahasa Melayu, English, Science and Mathematics is between 82% and 97%. In the meantime, the State Government hopes that the Federal Government can expedite the provision of vaccines to all students before the reopening of schools is carried out.

I agree with the fourth question, namely the view of the Honourable Member for Machang Bubuk that the reopening of schools should be postponed until all students, especially those below the age of 18, are given vaccine injections to create a safe learning environment. In addition, the State Government takes note of and will consider the proposal, namely the fifth question of the Honourable Member for Batu Uban, to submit an appeal to the Ministry of Education for the construction of a new Tamil secondary school.

Honourable Dato' Yang di-Pertua, the world of technology has developed far faster than expected due to the spread of the COVID-19 pandemic. To ensure that the State STEM centres, such as Tech Dome Penang and Penang Science Cluster, continue to fulfil their responsibility of nurturing students' interest in Science and Technology under this new normal, the STEM centres have increased the organisation of online workshops to continue stimulating participants' curiosity in the STEM fields. However, it cannot be denied that practical learning methods remain the most effective for STEM learning. Therefore, the Science workshops that have been conducted since before the enforcement of the Movement Control Order (PKP) continue, where the required workshop materials will be delivered to students' homes. In addition, Tech Dome is also developing new exhibition equipment in collaboration with several universities in preparation for when physical visits are allowed again in the future.

In closing, to conclude my winding-up speech, I once again extend my heartfelt thanks to the Honourable Members who raised questions regarding my portfolio, namely Human Capital Development, Education, and Science and Technology. I hope that the proposals and issues raised by the Honourable Members will help me and the State Government to further strengthen the implementation of the planned direction in adding value to education and human capital development in Penang, as well as empowering Science and Technology in everyday life. That is all, thank you. I beg to support.

Speaker (Speaker)EN

Thank you, Perai. I now invite the Honourable Member for Pinang Tunggal, please.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Assalamualaikum warahmatullahi wabarakatuh and Salam Sejahtera. Honourable Members of the State Executive Council bench, Honourable State Assembly Members, distinguished gentlemen and ladies. Alhamdullillah, allow me to record my appreciation and thanks for the opportunity given to me to wind up the debate on the Speech from the Throne delivered by His Excellency the Yang di-Pertua Negeri of Penang on 30 August 2021, particularly on matters relating to the portfolios of Islamic Affairs, Cooperatives and Community Empowerment.

I also wish to thank all Honourable Members who took part in the debate and made suggestions so that we can together improve the State Government's planning in providing the best services to the people of Penang. Whether we realise it or not, we have struggled with the COVID-19 pandemic for more than a year and a half, so let us take lessons from this to together comply with the SOPs, practise the new normal way of life, and strengthen personal safety controls wherever we are, in order to curb the spread of COVID-19 in our country. I begin by touching on matters relating to Islamic Affairs. As Chairman of the MMK Islamic Affairs Committee, I wish to take this opportunity to thank all parties involved for the support given to the State Government in its efforts to uphold Islam as the official religion in Penang. Several development elements were introduced in explaining the Rabbani concept, such as the development of human capital, organisations and the nation based on the maqasid Syariah. There are five (5) important elements emphasised in maqasid syariah, namely the protection of religion, life, intellect, lineage and property. In today's circumstances, the challenges faced in the effort to build "Khaira Ummah" or a Quality Ummah are not an easy matter. Development at the policy level needs to be strengthened properly, beginning from the smallest unit, the family. The cultivation of noble values must be nurtured from an early age in order to produce a quality society to develop the state and nation. This is in line with one of the five (5) pillars of "Khaira Ummah" that is the agenda of the Penang State Government, as outlined by the State Government, namely the concept of "baiti jannati", that is, the concept of "My Home is My Paradise", to focus on strengthening the family institution. I wish to record my appreciation and thanks to His Excellency the Yang di-Pertua Negeri, who gave attention and support to the Khaira Ummah 2030 agenda in the recent Speech from the Throne. This reflects the commitment of His Excellency Tun in ensuring the success of the development plan specifically for the Muslim community in this state. Regarding the question raised by the Honourable ADUN Sungai Dua, who asked about the effectiveness of the implementation of the Khaira Ummah 2030 Programme during the debate yesterday. Since the Khaira Ummah 2030 agenda is only one year old from the date of its launch, it is still too early to assess the effectiveness of the implementation of this programme. However, the activities identified through the induction sessions held in September 2020 have been arranged to ensure that the objectives, namely recognising the contribution of young people as the backbone of Khaira Ummah and upholding the mosque as a centre of ummah development by 2030, can be achieved. To ensure the smooth implementation of Khaira Ummah 2030, the Office of the Deputy Chief Minister I, through the MMK Islamic Affairs Committee, has mobilised 100 stakeholders consisting of Islamic administrative agencies, Government Departments, Non-Governmental Organisations (NGOs), professionals, religious scholars and community activists. As a comprehensive development plan for the Muslim community, the first induction for Khaira Ummah 2030 on 21 September 2020 outlined the following breakdown of components, named "HEBAT". The "Hikmah" pillar, whose main components are the Al-Hady Centre, Empowerment of Islamic Education and Legal Literacy. The "Economy" pillar, namely utilising Waqf and Muslim Assets, Muslim Entrepreneurs and Zakat Rejuvenation. Under the "Baiti Jannati" pillar, the focus is on Sakinah Families, Parents and Community, and Islamic Families and Law. Under the "Anak Muda" (Youth) pillar, the focus is on Youth and Knowledge, Youth and Skills, Youth and the Mosque, and under the "Tarbiah" pillar, on Fardiyah Dakwah, Digital Dakwah and the Ummatik Mosque. The current pandemic situation requires me, together with the MMK Islamic Affairs team, to make several adjustments to implement Khaira Ummah 2030 (KU2030). Therefore, a follow-up induction was conducted involving 40 stakeholders from 9 to 11 April 2021. The resolutions of the workshop focused on restructuring and prioritising all programmes that had been workshopped during the first workshop, with 69 activities and 133 KPIs identified as the focus for the implementation of this agenda. To ensure the smooth and consistent implementation of KU2030, a mechanism has been identified and named the KU2030 Dashboard. This team is responsible for monitoring the progress of the programmes that have been shortlisted and agreed to be implemented. The members of this task force are 8 main Islamic administrative agencies in this state, namely the Penang State Islamic Religious Council (MAINPP), the Penang Islamic Affairs Department (Jabatan Hal Ehwal Agama Islam Pulau Pinang), the Mufti Department of Penang (Jabatan Mufti Pulau Pinang), Zakat Pulau Pinang, Kolej Islam Teknologi Antarabangsa Pulau Pinang (KITAB), Wakaf Pulau Pinang (WPP), the State Syariah Judiciary Department (Jabatan Kehakiman Syariah Negeri) and Yayasan Islam Pulau Pinang (YIPP). As with other development plans, KU2030 is planned in five (5) main phases, namely 2020 – Planning, 2020 to 2021 – Promotion and Explanation, 2021 to 2030 – Implementation, reviews will be carried out in 2024 and 2027, and Achievement Assessment in 2030. Regarding Kolej Islam Teknologi Antarabangsa Pulau Pinang (KITAB), which has been much discussed by Honourable Members. During this Assembly sitting, I have received several questions involving the Islamic College, KITAB. I thank the ADUNs who paid attention to the development of KITAB in order to drive the legacy of tarbiah education towards producing ulul albab. In yesterday's debate session, the Honourable ADUN Sungai Dua and the Honourable ADUN Pantai Jerejak mentioned the sources of allocation channelled for KITAB's use. KITAB received an allocation of RM4.5 million in 2021 from the Penang State Islamic Religious Council through the contribution of Zakat Pulau Pinang as asnaf fisabilillah. The allocation channelled was for administration, development and living allowance scholarships. The Honourable ADUN Pantai Jerejak proposed that the State Government consider providing an allocation for KITAB's development use. For the Honourable Member's information, the State Government in 2021 allocated a sum of RM500,000 under the P13 Development Budget of the Penang State Islamic Affairs Department to carry out repair works at KITAB. KITAB has prepared plans to continue cooperation with Zakat Pulau Pinang and Wakaf Pulau Pinang to ensure long-term financial sustainability. Honourable Members, regarding waqf land in Penang. The Penang State Islamic Religious Council is constantly striving to carry out its functions and powers relating to the development and management of waqf property in Penang in order to defend the rights and interests in developing the economy of the Muslim community in the State of Penang. This role is in line with the provisions in Section 7(1), Duty of the Council Regarding the Economic and Social Advancement of Muslims, Islamic Religious Administration (State of Penang) Enactment 2004. For this purpose, MAINPP has made efforts to develop waqf property by implementing projects that can provide economic impact

to the Muslim community by developing shophouses, commercial centres and leasing waqf land for the economic activities of the Muslim community. The Honourable Sungai Dua also asked about the development of waqf land for affordable housing for the B40 group in Penang. For the Honourable Member's information, the development currently carried out on waqf land involves residential development, where the Siti dan Hajah Norijah Waqf Apartments, Sungai Nibong, and the An-Nur Waqf Apartments, Telok Ayer Tawar, have been built using allocations from the Department of Endowment, Zakat and Hajj (JAWHAR). The units of the Siti dan Hajah Norijah Waqf Apartments use a rental concept by offering rents 30% lower than the current value. A total of 25 housing units have been given to Zakat Pulau Pinang to provide shelter for the asnaf group in Penang at a rent of RM300 a month, where RM200 is borne by Zakat Pulau Pinang and only RM100 is borne by the asnaf concerned. To date, 17 housing units have been occupied by the asnaf group. The An-Nur Waqf Apartments, Telok Ayer Tawar, offers a total of 107 housing units for rent by providing a 30% lower reduction to the B40 from the market rate, namely at a price of RM700 and RM730 depending on the size of the house. The Penang State Islamic Religious Council has agreed to reduce the rental rate to RM550 and RM580 depending on the type of room for one year during the COVID-19 period. MAINPP is also planning to implement a rent-to-own concept for the An-Nur Waqf Apartments to facilitate the B40 group in owning homes. The Honourable ADUN Pantai Jerejak proposed that Zakat Pulau Pinang provide allocations to finance outstanding students to pursue higher education. For the Honourable Member's information, Zakat Pulau Pinang has provided assistance as follows; (a) Initial Assistance for Higher Education Institutions in and outside the Country, this assistance is provided to children of asnaf who receive offers to pursue studies at public and private IPTs in and outside the country, starting from the Certificate, Diploma and Bachelor's Degree levels, based on the conditions and eligibility determined. Applications are made online and are open throughout the year. For 2021, Zakat has provided an allocation of RM6 million for Initial Assistance to Higher Education Institutions. As of 31 August 2021, a total of RM873,500 has been disbursed to 1,031 recipients. The rate of assistance for each recipient is RM600 for the Certificate level, RM800 for the Diploma level and RM1,000 for the Bachelor's Degree level; (b) Study Scholarships at Higher Education Institutions, these scholarships are provided to children of asnaf who have pursued studies at local and overseas universities recognised by the Government in various fields of study from the Diploma, Bachelor's Degree, Master's Degree and Higher Degree levels based on the conditions and eligibility determined. Applications are made online and opened according to the period determined by Zakat (ZPP). As for Study Scholarships at Higher Education Institutions, the allocation is RM11,176,000. The amount of the scholarship is subject to the level, field and location of study, ranging from RM2,500 up to RM20,000 per year for each recipient; and (c) Special Sponsorship Assistance for Outstanding Students in Collaboration with Malaysia Professional Accountancy Centre (MyPAC), this assistance is given to students to take the ACCA course in an effort to produce professional accountants from among the children of asnaf in Penang. A budget of RM300,000 a year is allocated for this purpose, with a target of five (5) students a year.

Proposal for the establishment of a Death Benefit Scheme (Khairat Kematian). The Honourable ADUN Machang Bubuk proposed that a fund for the Death Benefit Scheme be established to assist COVID-19 patients who have passed away. Khairat means welfare. Khairat kematian is money collected from contributors to assist heirs in death and burial matters. So far, Death Benefit Funds already exist at the level of each Kariah Committee. The proposal to establish a Death Benefit Fund for COVID-19 patients who have passed away is very good and relevant to the present situation, which has witnessed a high death rate. The relationship of Muslims with adherents of other religions. The element of diversity is a unique programme created by Allah S.W.T. as a form of order and provision established for humankind. The rights and interests of adherents of other religions are still respected in their capacity as lawful citizens. However, there are still attempts to claim and dispute certain rights in the name of justice or fundamental liberties. The situation becomes increasingly troubled when racial issues also drag in religious issues, since a certain race in Malaysia is usually synonymous with a particular religion. Thus, the harmony that has been nurtured for a long time is seen to be increasingly eroded due to the role of irresponsible parties who like to manipulate various issues for their own interests. If not given attention, the situation could bring seeds of division that will destroy the bulwark of harmony and unity built all this time. As stated in the verse of Surah Al-Hujurat Verse 9, when two (2) groups of believers fight, then make peace between the two. If one of them transgresses against the other, then fight against the group that transgresses until it returns to the command of Allah S.W.T. If it returns, then make peace between them with justice and act justly. Indeed, Allah S.W.T. loves those who act justly. All parties are responsible for ensuring that the harmony and well-being of the people and the State of Penang are preserved and passed on to the young, to the generations of the future. Honourable Members, I now touch on matters relating to the MMK Cooperatives. The empowerment of cooperatives in the State of Penang is important in efforts to make a positive contribution to the economy and society of the people of Penang. According to the Malaysian Cooperative Commission (SKM), as of December 2020 there were 754 cooperatives registered in Penang with a membership of 152,172. The asset performance of Penang State Cooperatives showed an increase of 51% compared to the previous year, amounting to RM847 million in 2020. However, revenue performance decreased by 28% to RM169 million in 2021. This performance was driven by several factors, among them constraints in carrying out business activities during the COVID-19 pandemic and a shortage of business capital. As a state that is concerned about cooperative development, the Penang State Government launched the Penang2030 Coop Grant on 2 February 2021 to stimulate and help the cooperative ecosystem become more competitive in facing the new normal. A total of RM300,000 has been allocated to cooperatives that are competitive and to help cooperatives affected by COVID-19. As of August 2021, a total of 21 cooperatives have obtained financing approval amounting to RM287,734. Under the MMK Community Empowerment, a total of 373 MPKKs have been established throughout the State of Penang. My office has organised the COVID-19 Green Zone Community Competition for MPKKs in August 2021 to recognise the role of MPKKs in activities to fight COVID-19. The State Government under the Community Empowerment portfolio also took the initiative to hold a Group Personal Accident Takaful for MPKK Members in the State of Penang.

The State Government has appointed Etiqa Insurance & Takaful to provide the said Accident Takaful. A total of 5,399 MPKK Members have been covered by Personal Accident Takaful effective 1 May 2021 for a period of one (1) year, and the benefits obtained are as follows: death RM20,000, permanent disability RM20,000, accident treatment RM500 maximum per incident / per case, and for burial arrangements RM1,000. Next, I will touch on the Fishermen Task Force Committee. As mentioned in the speech of His Excellency the Yang di-Pertua Negeri, Tun Ahmad Fuzi bin Abdul Razak, regarding the Penang South Reclamation (PSR), initiatives under the Social Impact Management Plan (SIMP) are being coordinated. The State Government is conducting a review to identify the number of fishermen involved in the Penang South Island Reclamation Project PSR by examining lists from the Penang State Fisheries Department and the Malaysian Fisheries Development Authority (LKIM). As of 31 August 2021, a total of 535 fishermen from fishermen units in the southern area of Penang have registered their names to receive SIMP benefits. The Honourable ADUN Sungai Dua touched on the initiatives that should be set up by the State Government for fishermen affected by this PSR project. For the Honourable Member's information, the Fishermen Task Force Committee was established to draft and implement initiatives that will benefit the eligible fishing community affected by the PSR project. Therefore, the State Government is implementing the SIMP Management Plan through the following assistance packages;

1) Living Assistance Package through ex-gratia compensation payments, boat assistance and boat engine assistance. The amount of this compensation is paid to fishermen according to the level of the fishermen's location, whether level 1 or level 2. Boat and boat engine assistance will be offered to boat owners or skippers at level 1, namely from the fishermen units of Permatang Tepi Laut, Sungai Batu, Teluk Kumbar and Gertak Sanggul;

2) Empowerment Package through the construction of new modern fishing jetties equipped with various facilities and navigation channels that enable fishermen to go to sea for a period of 24 hours or go further out to sea regardless of whether the sea water is high or low tide, empowerment of fishermen's cooperatives, tuition and education schemes for fishermen's children, training or courses such as navigation, boat making, boat maintenance and so on for fishermen and their children, as well as employment opportunities for those who are qualified; and

3) Priority for registration for Affordable Housing to help fishermen who do not yet own their own homes. In addition, for housing too, the State Government is considering several proposals that have also been submitted to the government.

For the Honourable Member's information, the full implementation of the SIMP scheme will only begin after the PSR project is granted approval of the Environmental Management Plan (EMP) by the Department of Environment (JAS), which is being handled so that reclamation can be permitted to start. For the time being, a total of 385 members of Fishermen Units have received advance ex-gratia payments of RM500 after registering their names for the SIMP scheme. The State Government is still reviewing and updating the list of fishermen's names to identify the number of individuals eligible to receive SIMP benefits.

The State Government, through relevant departments and agencies, constantly receives proposals and input to improve assistance to fishermen affected from time to time, in order to ensure that the welfare of the fishing community affected by this PSR project is protected. During the speech of YB. Penaga, YB. Seberang Jaya asked about the support of my party, KEADILAN…(interruption).

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Dato' Speaker, may I have the floor briefly. YB, regarding this PSR project, I would like to ask a little about compensation: will the compensation element, including house compensation, also be considered by the State Government under this proposal for the affected fishermen? Thank you.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

No compensation element has been proposed so far. What I mentioned earlier is ex-gratia and also empowerment programmes. Compensation means there is a loss on the part of those affected. We do not consider it as such. During the speech of the Honourable Member for Penaga, Seberang Jaya, he asked about the support of my party, KEADILAN, which is also his party, the Honourable Member's party too, towards this PSR project. I would like to inform you that there have been discussions at party level on the planning and implementation of this project, and there are also critical views from the leadership, but officially there has been no objection or withdrawal of support for this project.

Speaker (Speaker)EN

That is a party matter. It is the party's internal affair. No need to mention it.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Because I was asked, I am answering here for his information.

Speaker (Speaker)EN

For information, but it has already entered the Hansard.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

The River Pollution Taskforce Committee arising from Pig Farming in Penang. I touch on this briefly because I am also the Chairman of the River Pollution Taskforce Committee. The Honourable ADUN for Sungai Dua also sought clarification on the implementation of Enclosed Pig Pen Farms in Penang. For the information of the Honourable Member, the Penang Veterinary Services Department is conducting verification of 153 pig pens throughout Penang starting from 2 August 2021, and it is expected to end at the end of the year. The Veterinary Services Department will present the verification results to the State Government for further decision. The Penang State Government is indeed committed to resolving the issue of river pollution by pig waste throughout the State of Penang, especially in two (2) rivers, namely the Valdor River and the Kereh River in North Seberang Perai. As an initial step, a taskforce committee has been formed with the role of proposing long-term solutions to cases of river and drain pollution by pig waste in the State of Penang. Second, to recommend all decisions relating to the taskforce on managing river pollution by pig farms in the State of Penang, and third, to act as implementer and monitor for the implementation of water quality restoration programmes in the rivers involved.

Up to August 2021, the taskforce has held three (3) discussions or meetings, and several matters have been discussed, including, one, funding initiatives by the private sector in a proposal to establish biogas energy technology and lagoons for pig waste, and two, monitoring related to the implementation of the Pig Farming Enactment 2016 and the Pig Farming Licensing Regulations 2020. Before I take my leave, I would like to record my highest appreciation to the Office of the State Secretary, BPEN, the Management Services Division, all District and Land Offices of Penang, the Penang Islamic Religious Affairs Department, the Penang City Council, the Seberang Perai City Council, the Penang Islamic Religious Council, the Malaysian Cooperative Commission (SKM) Penang, all members of the Village Community Management Council, members of the Women and Family Development Committee (JPWK), the management of mosques and surau throughout the State of Penang, and all related agencies, departments and institutions that have carried out their responsibilities earnestly to make a success of and implement the policies and planning under my portfolio. May the cooperation established continue in the future for the progress and prosperity of the State of Penang. Mr Speaker of the State Legislative Assembly, I beg to second.

Speaker (Speaker)EN

Thank you, Pinang Tunggal. Next, we return to the Most Honourable Chief Minister to wind up.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you, Dato’ Speaker. Honourable Members of the State Legislative Assembly, first, I would like to take this opportunity to express my appreciation and thanks to His Excellency the Yang di-Pertua Negeri of Penang for his concern over current issues in the State of Penang, as conveyed through the royal address at the First Meeting of the Fourth Session of the Fourteenth State Legislative Assembly of Penang. My thanks also go to all Honourable Members, both from the State Government and from the opposition benches, who took part in the debate on the speech of His Excellency the Yang di-Pertua Negeri of Penang. Although we are faced with the very challenging COVID-19 pandemic, the commitment shown by all Honourable Members in bringing the problems that burden the people, especially in their respective constituencies, into this august House is indeed commendable and deserves praise. [Members thump the table.] I welcome all the questions and issues that have been raised. We in the State Government leadership are responsible for ensuring continuity not only in the economic aspects of this State, but the State Government is also optimistic about ensuring that social and welfare aspects of the people remain a main agenda in driving the Penang2030 Vision, namely a Smart and Green State, Family-Based, an Inspiration for the Nation.

The issue regarding State Revenue. The State Revenue of Penang that was successfully collected for the year 2020 amounted to RM467.56 million, or 90.06% of the revenue estimate for 2020 of RM519.16 million. For the year 2021, up to 30 June, the revenue successfully collected amounted to RM386.90 million, or 76.46% of this year's revenue estimate of RM506.02 million. The existing revenue for 2021 has not been fully collected up to now due to the exemptions on revenue collection approved by the State Government following the COVID-19 pandemic. Accordingly, the State Government is experiencing a shortfall of revenue this year, therefore several strategies have been planned to cover this reduction, among them the first strategy, disposal of land by tender. At present, the disposal of Government land is carried out directly to certain applicants, with a premium charged at the prevailing market price based on the land valuation by the Valuation and Property Services Department (JPPH). Apart from this method, what can also be considered is disposal of land through tender. Through this method, Government land will be disposed of to the highest bidder, subject to land conditions, in order to maximise and generate higher returns for the State Government. The second strategy is to alienate industrial land to the Penang Development Corporation (PDC). At present there is Government land that arose from land acquisition activities for industrial purposes. This Government land has not been disposed of until a suitable investor who is interested submits an application for alienation. In this situation, the land is dormant and the State Government does not receive any revenue from this land. The mechanism that can be considered is that this Government land for industrial purposes be disposed of to PDC. Through this method, the State Government will receive consistent returns through land assessment from this land bank. The third strategy is the reclassification of land from rural land to urban land. The rapid development that has taken place has transformed some rural areas into advanced areas that have grown into towns. The reclassification of rural land to urban land is necessary and unavoidable for areas that have already become urban, and this activity does not involve village areas. It covers the expansion of existing town boundaries, such as the town of Bukit Mertajam for example, and the establishment of new towns such as Bayan Baru. If this reclassification activity is not implemented, it would be unfair to residents in urban areas that have been gazetted. The most striking examples are Bayan Baru and Bayan Lepas. Bayan Lepas is urban land although it is only a small town. Meanwhile, Bayan Baru is rural land, yet if we look at the development that has taken place, development in Bayan Baru exceeds development in Bayan Lepas. The general concern that should be set aside is an increase in the land assessment rate. With this reclassification, owners of rural land assessment will pay according to the land assessment rate for urban land, which assessment rate has not changed and has been used for 26 years, namely since the year 1994. Although the land assessment review is carried out every year, given the COVID-19 pandemic, the State Government has decided to postpone the enforcement of this reclassification until a more suitable situation. The fourth strategy is the conversion of interim register titles for unclear titles. At present there are tens of thousands of land titles that have not yet been converted to land titles under the National Land Code 1965. Of these thousands of titles, some are unclear titles, meaning ownership of the land cannot be ascertained. The estimated period to fully complete the process of converting interim register titles is expected to be between three (3) to five (5) years depending on the complexity of the IR title issues, and this process has already begun. Once the process of converting IR titles begins, indeed it has already started, the State Government is likely to benefit in the form of land being returned to the Government in respect of unclear titles, and this land may be disposed of or used for development purposes.

Apart from these four (4) strategies, Dato’ Speaker, several other measures will also be implemented by the State Government to increase revenue, namely monitoring the collection of State Revenue. For the year 2021, the State Government's revenue collection is estimated at RM506 million, and the State Government is always striving to achieve the collection target that has been finalised, as well as constantly reviewing the State Revenue collection reports on a monthly basis and holding various meetings on State Revenue collection management on a regular basis. Increasing State Revenue through investment activities. Among the other measures taken by the State Government to increase State Revenue is through investment activities, namely investment in fixed deposits, investment in the equity market, and monitoring new shares. Increasing the collection of State Revenue arrears. Up to June 2021, the total State Revenue arrears amounted to RM93.59 million. If these arrears can be collected, State Revenue will increase and will be able to reduce these arrears. The State Government is always committed to redoubling efforts to increase State Revenue and reduce revenue arrears by taking legal enforcement action and continuous monitoring. Gazetting unclaimed deposits. The State Government is taking action to review the status of deposit accounts and to gazette unclaimed deposits after a period of 12 months from the date the deposit can be returned, so that they can be credited into the Consolidated Revenue Account. This action will indirectly increase State Revenue. Increasing the amount of allocations from the Federal Government. The State Government also requests the Federal Government to increase the amount of allocations to the State Government, considering that the State of Penang is among the states that contribute the highest to Malaysia's foreign direct investment, or FDI, and this in turn contributes to national revenue in the form of taxes. These allocations from the Federal Government include allocations based on population, service fee payments of 10% for implementing Federal development projects, allocations of additional Federal Government revenue, allocations to finance operating expenditure under the concurrent list, tourism allocations, allocations based on the level of economic development, infrastructure and quality of life, as well as Federal Government allocations to the State Road Maintenance Trust Fund, or MARRIS. Dato’ Speaker and Honourable Members, with regard to the land development problem raised by the Honourable Member for Sungai Dua, which involves the sale of 1,100 acres of State Government land valued at RM12.5 billion since 2011. I wish to emphasise that the sale of these lands refers to the sale of land by PDC, the State Government and the Penang Island City Council, which is managed by PDC. Through a review of the revenue from the sale of State Government land totalling 485 acres to several companies such as Ivory Properties Group Berhad, Zubicon Sdn Bhd, PE Land Sdn. Bhd., Paramount Corporation Berhad, Aspen Vision Land Sdn. Bhd., Tanjung Villa Development Sdn. Bhd., Nada Samudra Sdn. Bhd., Pertubuhan Buddhist Tzu-Chi Merits, Biopolis Resources Sdn. Bhd. and Pentamaster Engineering Sdn. Bhd., the value is RM1.9 billion only and not RM12.5 billion as stated by the Honourable Member for Sungai Dua. It should also be emphasised that the sale of these lands is to revitalise the State's economy for the benefit of the people as a whole. PDC, as the state development agency, plays a very significant role in leading socio-economic growth, creating more employment opportunities and improving the quality of life of the people of this State. PDC is also responsible for using the surplus from these sales to enhance PDC's land bank so that industrial and mixed development, infrastructure development and new development projects can continue to be implemented.

That means the proceeds from land sales, especially for industry, are reinvested to provide very expensive infrastructure, build roads, bridges, provide telecommunications facilities and flood mitigation, and so on, and also to acquire new land to continue the industrial development agenda in our State. Next, in answer to the supplementary question of the Honourable Member for Bukit Tambun regarding the land acquisition by PDC at Jalan Paboi, it is for a proposed new interchange for the purpose of decongesting traffic entering and leaving Bandar Cassia and Bukit Tambun. I wish to inform you that the re-acquisition of this land is in the process of re-gazettement under Section 4 of the Land Acquisition Act 1960. The land acquisition has been delayed due to several key factors, including the application for the allocation of land acquisition costs under RMK-12, the Twelfth Malaysia Plan, and the implementation of a Traffic Impact Assessment study to identify the need to implement this project. With regard to the issues raised by the Honourable Member for Bukit Tambun and the Honourable Member for Batu Lancang that the District and Land Office and the Land and Mines Office should improve efficiency in processing land management applications during the COVID-19 pandemic period. I wish to inform you that this issue arose since the implementation of the Movement Control Order (PKP) to curb the spread of COVID-19 throughout the country starting 12 May this year, and the instruction to comply with SOPs at the workplace by the State Secretary, as well as the announcement by the Chief Secretary to the Government on 29 June regarding the operation of counter services for government offices with capacity not exceeding 50%, while the overall attendance percentage of departments involving officers and staff has been reduced to 20% and most recently to 60%, in line with the rules that have been set. On 30 August, with the very limited counter capacity and staff, the PTG successfully settled all the list of outstanding transactions submitted by the Penang State Bar Committee. Following that, the PTG agreed that the Penang Bar Committee should submit all lists of outstanding transactions of all law firms in Penang up to the latest. So far, the list of outstanding transaction applications submitted through the Penang Bar Committee involves approximately 300 law firms, with an estimated total of 9,045 transactions involving 3,015 title documents, and the Penang Bar Committee agreed with the PTG to arrange appointments and settle all the above applications with the limited counter capacity. The Penang Bar Committee has also informed that law firms will not submit new applications until all these applications have been settled. In addition to law firms, the PTG is also responsible for settling applications from outside law firms from the State of Penang, from the Royal Malaysia Police (PDRM), the Malaysian Anti-Corruption Commission (SPRM), surveyors, developers, Government departments, JMB, MC, licensed valuers, members of the public and other parties as well. The PTG has also taken various initiatives to settle applications from all parties, among them by providing a drop box service for official searches, private searches and unlimited consents for all customers. The work at the PTG is also not limited to transactions involving the sale and purchase of land or houses alone, but also involves the registration and issuance of strata titles, the issuance of temporary titles and permanent titles, document review, judicial matters, processing land applications, and providing advice to stakeholders on land issues and much more.

The PTG is planning to provide online services for private searches and booking of official searches. Three (3) companies have made presentations and will submit tender offers for the cost of developing the system. The PTG will table the selected proposals for the attention of the ICT Steering Committee chaired by the Honourable SUK, and the Government will make a decision. However, this plan can only be implemented if it is ensured that the system is suitable and obtains the approval of the ICT Steering Committee, and also involves special financial allocations for this purpose. If the project proposal is approved, it is estimated that the system can be put into use by the end of this year. It is expected to provide convenience to customers to conduct searches without having to be physically present at the PTG counter. The redevelopment of the e-tanah system needs to be implemented urgently, whether using Federal Government or State Government allocations. This is so that more online transactions can be carried out and a safer and more up-to-date system can be operated by the Land Offices, especially the PTG. If approval is granted, the entire development process is expected to be completed within two (2) to three (3) years, depending on the agreed development and implementation method. Apart from that, the arrangement of space and the number of counters and office space at the PTG is to allow the capacity of staff attendance and counters to be optimised without posing safety risks to staff and customers. Penang Land Rules 2021. Dato’ Speaker, looking at the current situation and based on the amendments that have been made to the National Land Code, there is a need to enact new Penang Land Rules to replace the old ones, which were enacted in 2005. Accordingly, a draft of the Penang Land Rules 2021 was tabled and approved in the State Government Executive Council on 6 January 2021 and was gazetted on 22 July 2021. However, the Penang Land Rules 2021 have not yet been enforced, and the decision regarding the enforcement date will be gazetted on another date to be decided later by the State Authority. The reason is that the time is not suitable because of the COVID-19 pandemic. So we have indeed given various considerations when it involves taxes, which in turn involves taxpayers, namely the people and voters. The Penang Land Rules 2021 is a continuation and is to replace the application of PLR 2005 which is currently in force. PLR 2021 contains three (3) main components or sections, namely the rules in Schedule 1 which contain the forms, and Schedule 2 which contains the fees and application payments. I think I can summarise this. Let us move on to the current COVID-19 situation. On 23 August last, I sent a letter to the Right Honourable Prime Minister regarding additional supplies of vaccines to the State of Penang, and yesterday our state was informed by the State Health Department (JKNPP) that we will receive 1,015,500 doses of vaccine. [Members of the House thump the table.] Vaccine doses for the entire month of September. I think for the past few months, I have had no other work than monitoring the vaccine supply. [Members of the House thump the table.] Because we had planned, we increased the capacity of PPV to reach a capacity of 45,000 doses a day. But the supply we receive does not allow us to reach this capacity, and at the highest we only managed 35,000 in three (3) or four (4) days. The rest on average may be in the range of 28,000 to 30,000 only. That is a problem not only faced by the State of Penang, but the whole of Malaysia, other states and indeed the whole world, because we understand that the global vaccine supply has some countries that have controlled this supply with stockpiles in their own countries, even though their populations are far lower than their vaccine stockpiles.

So we thank you, because with more than a million vaccines we can complete the first dose in perhaps 10 to 14 days to come. The first dose can finish, but when we say finished, it is not really finished, as in Selangor State now, which has already reached more than 100%, because the adult population is only an estimate based on the Department of Statistics. The statistics are from ten years ago, so even at 100% we may need to use walk-in or mobile PPV methods so that people who have not registered will also get the opportunity to receive the vaccine. So the delivery for September's supply will be obtained starting tomorrow, 3 September, which includes 200,000 doses as per the special approval by the Ministry of Health (KKM) last week. I believe Honourable Norlela or the EXCO for Health has informed this House. With the MOH approval, it does not mean that we reject the offer of a vaccine loan from the State Government of Selangor. On the contrary, during the courtesy visit of the Menteri Besar of Selangor to me on 31 August recently, both parties agreed that the offer remains open and discussions will continue based on future current needs. On the aspect of supply of medical manpower and equipment, I welcome the announcement by the Minister of Health yesterday, and that assurance was reiterated once again at the meeting of the National Security Council (MKN) on COVID-19 Management this morning, where I attended in the room next door, this morning, and it was informed that previously Penang also channelled medical manpower to the Capital City to bring down cases under the Greater Klang Valley Programme. Therefore, the same approach now needs to be used, focusing on the northern states of the Peninsula, especially the State of Penang, perhaps Kedah and Perak. Apart from the supply of medical equipment, especially to the Intensive Care Unit (ICU), emphasis also needs to be placed on increasing the capacity of Quarantine and Low-Risk COVID-19 Treatment Centres (PKRC), and indeed the voices of the Honourable Members have been very loud and we believe this matter needs to be improved immediately to ensure such cases do not ultimately result in the loss of many lives. One issue that is shocking concerns the 32 cases identified as involving COVID-19 Delta variant infection in our State, as announced by the Director-General of the MOH on 31 August recently. JKNPP informed that of these 32 cases, 8 involved deaths and the other 24 have completed treatment and been allowed to leave the treatment centre. Actually these 32 cases are not new cases but occurred several weeks ago, only that when JKN sent samples of these cases during epidemiological week 27, namely 4 to 10 July, up to epidemiological week 33, namely 15 to 21 August, the sample results were only received on the date of the announcement by the DG of MOH, namely 31 August 2021. So, I think we waited for more than one (1) month for the result and finally it was confirmed as Delta but all this caused 8 death and the rest has recover lah. This means that laboratory results for Delta variant cases require a fairly long period, namely almost a month or more. Therefore, as further monitoring, JKNPP continues to send samples according to the prescribed criteria, and hopefully this can control the spread of the Delta variant in this State. As additional information, of the 32 reported cases, 27 patients had not received any vaccine injection, 5 received one (1) dose, and no cases involved those who had completed two (2) doses. So from this small sample we see the effect of the vaccine on severity when infected. This includes 27 had never received vaccine, one (1) dose five and none received full vaccination. Since the spread of COVID-19, the State Government has spent approximately RM180 million to meet the needs of medical equipment in hospitals throughout this State, in addition to several major allocations such as the Rakyat Assistance Package, Penang Saring COVID-19 and so on. So the final point I think, because there are still many more matters and time does not permit, the Chief Minister is also not exempt from time, time limit… (interruption).

Speaker (Speaker)EN

You still can go until another 15 minutes bonus for you.

The Honourable Chief Minister: I state that the State Government is indeed committed to protecting and ensuring that all the people of this state, especially the adult population, receive vaccination and achieve herd immunity in this state. A balance between health, economy and society needs to be achieved for the overall well-being of our beloved State of Penang. On 1 September 2021, the Honourable Minister of Health announced that Malaysia will enter the COVID-19 endemic phase starting late October this year, after 80% of the adult population in this country have completed two (2) doses of vaccine. In this phase, the people must accept the concept of living with the virus, even though the country has succeeded in controlling the COVID-19 pandemic. With vaccination, efforts to change behaviour and continuous efforts to practise the SOPs, we can begin to enter the new phase of living with the COVID-19 virus. This step also enables various sectors in the country to reopen and the people's lives to return to normal in the new norm. The State Government welcomes the announcement made today by the Ministry of Health Malaysia (KKM) and the Ministry of Domestic Trade and Consumer Affairs regarding the wholesale ceiling price and retail price for the COVID-19 Antigen Rapid Test Kit or self-test, which are priced at RM16 wholesale and RM19.90 retail respectively. However, the Penang State Government hopes that the announced prices can still be reduced further, as the use of the kits will certainly increase further during the endemic period. Hereby I am pleased to announce that, as a start, the Penang State Government will allocate 500 sets of these test kits to each State Assemblyman and each Member of Parliament in the State of Penang for distribution to people in need. The method of distribution will be announced in the near future. This involves more than RM400,000. [Members thump the table]

So, Honourable Speaker and Members of the House, I would like to summarise and move on to the closing, and I would like to extend my appreciation and thanks to everyone involved in ensuring the smooth running of the House during this session, although it had to be carried out in a short and brief period. Our House was still able to sit well so that the principle of checks and balances can be implemented perfectly. My thanks and appreciation to all Members of the House who have conducted self-screening and declared themselves fit to attend. Indeed, this is a new norm that we must observe in order to control the spread of the COVID-19 outbreak. I also record my highest appreciation and thanks for the commitment and efforts of all members of the civil service who are involved in contributing towards the development, peace and prosperity of the state and the well-being of our people. On this occasion too, I would like to extend my highest thanks to the frontliners who have worked hard in efforts to curb the spread of the COVID-19 pandemic.

I would like to take this opportunity to wish good luck in the new post to the Penang State Health Director, Dr. Ma'arof Bin Sudin, who replaces the Esteemed Datuk Dr. Asmayani Khalid who was recently appointed Deputy Director-General of Health (Medical) of KKM. The State Government hopes to further strengthen the collaboration between the State Government and the Penang State Health Department in the war against COVID-19, especially in curbing the spread of the Delta variant in our state. Finally, I urge all the people of the State of Penang to continue to comply with the SOPs that have been set to curb the spread of this COVID-19 pandemic. Hereby, Honourable Dato' Yang di-Pertua, I respectfully second the motion. Thank you. [Members thump the table]

Speaker (Speaker)EN

Thank you, Padang Kota. Honourable Members, the winding-up session for information has been completed. Therefore, the question before us now is the motion "Bahawanya kami Yang di-Pertua Dewan Undangan Negeri dan Ahli-ahli Dewan Undangan Negeri Pulau Pinang memohon mengucapkan terima kasih kepada Tuan Yang Terutama Yang di-Pertua Negeri Pulau Pinang kerana berkenan melafazkan ucapan kepada Dewan ini di Mesyuarat Pertama Penggal Keempat Dewan Undangan Negeri Pulau Pinang Yang Keempat Belas pada 30 Ogos 2021" which has been agreed to. Those who agree, say 'Ya'.

State Legislative Assembly Members: 'Ya.'

Speaker (Speaker)EN

Those who do not agree, say 'Tidak'. 'Ya'. Unanimously, the motion is agreed to.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Honourable Dato' Yang di-Pertua, I respectfully propose that this House be adjourned now.

Speaker (Speaker)

Ada sokongan?

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Honourable Yang di-Pertua of the State Legislative Assembly, I respectfully second the motion.

Speaker (Speaker)EN

Thank you, Pinang Tunggal.

Secretary of the HouseEN

Honourable Members, the Most Honourable Chief Minister has proposed that this House be adjourned and the motion has received a seconder.

Speaker (Speaker)EN

Thank you. Honourable Members, once again I would like to extend my thousands of thanks to everyone for your cooperation throughout this session of the House. In particular, I thank the Health Department, which has helped in all aspects of controlling and taking preventive measures against COVID-19, especially thanks to the Health Department. I also apologise to everyone for all the shortcomings in this House during this session, especially since we are in a pandemic situation. Therefore, the House is hereby adjourned to a date to be announced later. Thank you. [Members of the House thump the table]

Honourable Members, there will be a group photo session from the back here.

The House was adjourned at 6.35 p.m.