Pulau Pinang · 30 November 2021

14th Assembly, 4th session, 2nd meeting · 408 turns · 45,426 words · official PDF ↗

324 of 408 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

Absent: Lim Guan Eng (Air Putih), Datuk Seri Saifuddin Nasution Bin Ismail (Pantai Jerejak), Zulkifli Bin Ibrahim (Sungai Acheh), Dato’ Seri Abdul Razak Bin Jaafar (Setiausaha Kerajaan Negeri)

(Opening)

Secretary of the HouseEN

Honourable Members, YB. Mr Speaker of the Dewan Undangan Negeri (DUN). Prayer recitation. Oral questions

Speaker (Speaker)EN

Good morning, Honourable Members, and we resume sitting with the oral question session. I am pleased to invite question number 16.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Thank you, YB. Mr Speaker of the Dewan Undangan Negeri. My question is question number 16, No. 16. Please list every beverage categorised as liquor in Penang. (a) What is the total number of liquor buyers in this state? Please list the figures by DUN and by race. (b) Please list the cases and number of cases, as well as the accidents caused by liquor or drunkenness.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker, and thank you to the Honourable Member for Penaga. Referring to the Akta Aksais 1976, the definition of liquor is intoxicating liquor, which carries an RT given under Section 2(1) of the Customs Act 1967, namely any alcohol or any liquid containing more than 2 per cent proof spirit, which is suitable or intended for, or can in any way be converted for use as, a beverage, while beer includes all stout, bottled and other liquors made from malt. To answer the question of the Honourable Member for Penaga, the State Government does not have information on the total number of liquor buyers in Penang because there is no law requiring buyers to register their names for the purchase of liquor, or any law requiring premises to record the number of liquor buyers. As for the number of accidents caused by liquor or drunkenness, these are as shown in Appendix A and Appendix B, which will be placed on the Honourable Member's desk after the oral question session ends. Thank you, Mr Speaker of the Dewan Undangan Negeri.

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

Supplementary question. Thank you, YB. Dato' Speaker, and thank you to the Honourable Member for Tanjong Bunga for the answer that has been given. I see that the liquor issue does not only revolve within our state but across the country, and there are many cases involving loss of life or accidents resulting in death. Our state also recorded in 2019 that an MBPP worker was killed after being struck by a drunk driver,

and also there was a case in February 2020 where two (2) friends died when the motorcycle they were riding was hit by a drunk driver. Also this year, on 10 June 2021, there was an accident on the Butterworth Outer Ring Road caused by a drunk driver. We also see cases where a drunk driver driving a Toyota Vellfire crashed through an SJR, a road block set up by the PDRM, on the highway...(interruption).

Speaker (Speaker)EN

YB. Honourable Member for Penaga, question, question?

Mohd Yusni Bin Mat PiahPAS · PNPenagaEN

So, looking at the statistics I have mentioned, my supplementary question is whether the State Government is prepared to take preventive measures and also controls, as done by Kuala Lumpur City Hall (DBKL), which decided not to allow, for example, the control that does not permit grocery stores and also convenience stores to sell liquor starting October 2021. I also see a good response from Sahibus Samahah, our Mufti, the State Mufti of Penang, who also recommended that this step be followed by all states, and this may also include the State of Penang. So my supplementary question is whether the State Government is also prepared to take preventive measures and controls? Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. To answer the question of the Honourable Member for Penaga, as far as I am aware at the moment, the State Government has no new plans to impose any additional restrictions. I think that even at present there is already legislation. Just now the Honourable Member raised the issue of road accidents and so on. We have the Road Transport Act 1967, in particular Section 44(1) and Section 45A(1), which specifically apply to drivers who drive under the influence of alcohol. As for cases like that of DBKL, at this time the State Government has no plan to prevent shops that may sell liquor. Thank you.

Soalan tambahan.

Speaker (Speaker)EN

YB. Leader of the Opposition.

Thank you, YB. Mr Speaker. Firstly, regarding the enforcement of liquor sales in shops such as 7-Eleven and so on, so far I think enforcement is carried out by the City Council. Can we or can we not extend this enforcement, perhaps to the Islamic Religious Department and others who can monitor it? If only the Council monitors it, there may not be enough personnel to carry it out. Secondly, regarding punishment, I see that the punishment imposed on drivers who are drunk under the influence of alcohol, who collide and cause serious injury and death, is rather low or inadequate for a death. So, if possible, perhaps we could propose or discuss, agree or not? for us to increase or impose heavier punishment on those who have hit someone under the influence of alcohol and caused death. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. As the Honourable Member is also aware, this is an issue of federal law. However, I think there is no problem if the Honourable Member wishes to propose to the federal government that punishment be increased. I think many people will support this. As for enforcement, the power to carry out enforcement, we need to look at the source of authority. So at the moment, enforcement officers from local authorities do have the power to enter premises to ensure that goods are sold in accordance with existing regulations. But if it is the Religious Council, I do not think it has such a source of authority. The State Government takes note of the Honourable Member's proposal and this will be discussed. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. YB. Honourable Member for Sungai Pinang.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you, YB. Mr Speaker of the Dewan Undangan Negeri. My question is question number 17. No. 17. So far, how many MOUs have been signed between the Penang Youth Development Corporation (PYDC) and institutions of higher learning (IPT)? (a) What were the purposes and outcomes after the MOUs were signed?

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, YB. Mr Speaker of the Dewan Undangan Negeri. Thank you, I will answer question number 17. So far, the Penang Youth Development Corporation (PYDC) has signed MOUs with 14 institutions of higher learning (IPT) such as USM, UOW Malaysia, KDU Penang, Penang Skill Development Centre (PSDC), Han Chiang University College, SEGi College, Tunku Abdul Rahman University College, Politeknik Seberang Perai, UNITAR International University, IPK College Penang, Management and Science University Penang, MSU, INTI (International College Penang), Disted College, Peninsular College Penang and Advance Tertiary College. The purposes and outcomes after the MOUs were signed are

to develop and assist, and to encourage research, education, transfer, skills, student exchange, entrepreneurship, talent scouting, graduate careers and the holistic development of youth empowerment programmes. To encourage the sharing of resources between both parties, including infrastructure expertise, equipment and so on. The Government becomes a platform for building relationships between university students to advance their careers before they start work. We also provide a platform for them to secure the job, and an internship programme will also be organised for them. At the same time, the purpose is also to share experiences and broaden the perspectives of students in the various agreed fields. In addition, it can also set a general framework for academic relations to discuss academic and industrial scope among students. Indeed, the IPTs that have signed MoUs with the Government and PYDC agency, we are targeting several series of webinars and online and physical forums to discuss topics related to careers, entrepreneurship and soft skills, for example Live Streaming, Star Championship 2021, digital marketing course, web design competition, international youth conference 2021, web development training programme, web development training and also virtual career fair, Industrial Talk: How to Write a Good Resume, an education project themed effectiveness, programme (NEET) Not in Employment, Education and Training. These are the programmes and also the outcomes that we have collaborated with IPTs on.

Lim Siew KhimDAP · PHSungai Pinang

Soalan tambahan

Speaker (Speaker)

Silakan.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you, Bagan Jermal. So, will PYDC continue to sign MoUs with IPTs in Malaysia or outside Malaysia after this? And besides collaboration in terms of academics, does PYDC plan to provide a platform or programme where or for students at different IPTs to interact with each other? Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Dato' Speaker. I am answering the supplementary question from Sungai Pinang. Indeed, PYDC, besides the IPTs that have signed MoUs, also intends to collaborate or sign MOUs with IPTs or universities overseas. At present we are not restricted; we are currently signing MoUs beyond the state of Penang, because we understand that there are indeed many students originating from Penang who study at other universities and also overseas. So one of the goals we can achieve is to be able to collaborate with more universities to educate, develop and empower youth towards holistic development, so indeed we do have such an intention.

Besides collaboration in academic terms, PYDC also plans to collaborate with other fields, including leadership programmes, community service projects, training and talent development, soft skills empowerment, e-sports, entrepreneurship, exchange programmes and so on. These collaborations are open to students who come directly from different IPTs. These collaborations have become a platform for youth who come from different states or different countries to share and interact, which is a very valuable experience for youth development. Thank you.

Speaker (Speaker)

Terima kasih.

Supplementary question. Thank you, Dato' Mr Speaker. I was very interested in what was explained by Bagan Jermal regarding the approach or the MoUs that have been made with IPTs. This is important because we want to bring IPT students closer and also add skills and so on so that they become more qualified. However, I am somewhat worried about the involvement of these IPT students in bodies or associations. They are rather less involved in associations and also bodies. What approach do we take to ensure that once we approach them, they will be interested in joining associations to carry out activities under NGOs and associations that exist in their respective areas across the state of Penang? Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the supplementary question from Sungai Dua. This question is indeed good, in that the involvement of university students in associations is indeed somewhat less active; some are indeed active. So when we met with all the universities we discussed how to collaborate and cooperate to develop students or undergraduates who study at universities. There are universities where they have programmes for community service, such as MMU, which has many clubs. The clubs that have been established organise several programmes every year, and at the same time they also go to other states. For example, in December 2021 several universities will organise delegations of their students to come to the state of Penang, and they will work with Penang Youth Volunteer to go to areas such as rural areas to cooperate, interact and also contribute some of their knowledge at youth centres. We do plan to work with their students, and the students from these universities do not necessarily come from Penang; they follow their associations to attend together. This is one piece of information, because in Penang at the moment we have 2030 youth volunteers from those 7 categories.

Speaker (Speaker)EN

Yes? You want to ask question to EXCO? No need lah (inaudible) no need, Bagan Jermal.

Soon Lip CheeDAP · PHBagan JermalEN

So in terms of the youth volunteers, we have 2030 from the 7 categories, so we will give them the opportunity to share and interact. At the same time, the universities that have signed MoUs with us in the state of Penang are also prepared, if students from other universities come, that they are willing to share knowledge, such as USM, Politeknik and SEGi College, KDU and others. This is the goal we want to achieve, to provide more platforms. I agree with what Sungai Dua said, that it provides many opportunities or platforms for students or undergraduates to get involved in community service.

Speaker (Speaker)EN

Thank you for the MOU question. Next is question number 18, but question 18 has already been answered together with question 12 yesterday, so I invite question 19, please.

My question is question 19. No. 19. Is the State Government of Penang aware that a sea reclamation project can produce a lot of carbon dioxide? How do we solve this and achieve a low-carbon city? (a) List the Townhall sessions held by the Consultant/JAS. Describe the outcomes of the discussions. (b) The Bagan Ajam reclamation mixed development project will expose Malaysia's military secrets. Please explain.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, and good morning to all my colleagues. Dato' Speaker, thank you, and to my colleague from Sungai Dua, Dato' Sungai Dua, thank you so much for your question, which is most important, why? The question is very relevant in the current situation, namely whether or not we are aware that a sea reclamation project can produce a lot of carbon dioxide, and how we are going to solve it and also achieve a low-carbon city. So I think your question is extremely relevant, Dato'. Why? Because it is at a time when the whole world is experiencing a climate crisis; previously it was called climate change, now it is a climate crisis, last time it was climate change, now it is climate crisis, so indeed the Penang Government has various projects to ensure how we can see what we can do to solve it. Of course the question has two parts, one concerning townhall sessions and consultants, and what the outcomes of the discussions were, and of course that is another question, which is specifically that the Bagan Ajam mixed development project will expose Malaysia's military secrets. I will go straight to the answers first, Dato' Speaker. We, of course, as I stated just now, the State Government does take note that any sea reclamation project will have an impact on the environment.

Therefore, we will always ensure compliance with all the necessary requirements from all the relevant agencies. So, as a follow-up action, Dato' Speaker, we have passed the Penang State Structure Plan 2030, which outlines, Dato' Speaker, environmental pollution control through green technology approaches and the low carbon city framework or LCCF practice under main planning policy 5.4 to achieve a low-carbon city in the state of Penang. We want to become the leading state in Malaysia with the least carbon footprint, and we will do it with all the projects that we have, which I can explain to you, but let me quickly respond to your question first. Schedule Two under the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015 requires, Dato' Speaker, public exhibition and public comments from the people. The public exhibition of the Bagan Ajam reclamation mixed development project, to answer specifically Dato' Sungai Dua, was held from 13 September 2021 to 12 October 2021. Number two, the State Government will also pay attention to that second question seriously; we will give serious attention to the aspect of the secrecy of Malaysia's military during the implementation of this project. I think that there is no doubt about that. We have collaboration and will receive input from the Royal Malaysian Army. The State Government has held a meeting on the proposed master plan of this project, as I have stated, and it was attended by the Royal Malaysian Air Force (TUDM) and the Office of the Chief Government Security Officer to discuss land security issues and so on. So all this must definitely be taken into account; we cannot proceed with the project unless we get their input. That concludes my reply, thank you.

Speaker (Speaker)EN

Please ask supplementary question.

Soalan tambahan

Speaker (Speaker)

YB, YB.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Thank you, Dato' Speaker. Firstly, on the issue of carbon, reclamation at sea produces a lot of carbon. So this is a serious matter. It will happen after implementation, not before implementation, so what steps will we take? We do say here that we will resolve it, but I am worried that when we implement it tomorrow, it will happen, and there will be no one who wants to implement the conservation solutions. This will involve many villages and housing estates in the surrounding areas, such as Taman Tun Dr Awang, Kampung Contoh, Taman Mas and so on. Many housing estates in that area, all the way to Teluk Air Tawar. Who is able, or who should be the one to carry out carbon conservation?

Secondly, regarding security confidentiality, this has indeed been discussed and presented, but we want a consent or an official written statement from the Ministry of Defence or the military, that there is no problem in terms of military confidentiality matters in that area. Because we are well aware that when you climb a tall building, from above you can see what activities are taking place in the base or air base.

Thirdly, regarding the Bagan Ajam reclamation project, this mixed development, I also want an explanation from Datok Keramat: will it be the same as the Dream City project in terms of the breakdown of the forms of housing development valued at RM1 million to RM2 million in that area, because it is a very elite development, by the sea, where you can see the sunset, see the island and so on. If possible, we want a consent on whether this mixed development will have RMM units built there. Thank you.

Lee Chun KitDAP · PHPulau TikusEN

Dato' Speaker may add a little too, because the Gurney Wharf project is also related to reclamation.

Speaker (Speaker)EN

This question is related to Bagan Ajam.

Lee Chun KitDAP · PHPulau TikusEN

But I want to add a little: regarding Gurney Wharf, what steps have been taken to help it, yes, thank you.

Terima kasih, Dato’ Speaker, thank you very much to Dato’ Sungai Dua, of course my answer will answer Pulau Tikus as well. Okey yang pertama I think we go to keselamatan kita kerana ada based tentera di situ TUDM sepertimana saya nyatakan tadi dalam perbincangan kita sememangnya dalam Pelan Induk projek ini ada perbincangan dengan pihak yang tertentu iaitu yang penting TUDM, Dato’ Speaker and of course Ketua Pegawai Keselamatan Kerajaan Malaysia, which is still on going ada beberapa permohonan ataupun permintaan supaya dilihat semula keseluruhan Pelan Induk so it’s the reason why and we are looking into this, we still have to continue with our conversation dan perbincangan kita dengan semua pihak yang tertentu tapi untuk isu keselamatan sememangnya kita tak akan kompromi. I give you that commitment, Dato’ Sungai Dua but of course this is will come also from the Federal Government kita akan lihat dan dengar kepada apa input dan cadangan pandangan mereka certainly without a doubt.

That’s is number one (1), number two (2), I think I want to come back to the most important issue that Dato’ Sungai Dua has probability had a four side to ask in relation to how do we reduce carbon emission and try to be zero, 1 negeri dan sifar karbon dalam krisis iklim yang kita lihat bukan perubahan iklim sekarang kita krisis, come back to that, let me give you a few example, because it’s very important I think it’s something new, you see because pandemic COVID-19 supposed to become endemic but then now we got the latest strange antico or something which I don’t know we are probably going to greaten to pandemic or not...(gangguan) was not going to but let me get to carbon, carbon reduction…..(gangguan).

Speaker (Speaker)

Use your Bahasa Kebangsaan more….

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Yes, yes, no problem. I want to state that the pandemic is the first crisis that we are still in the midst of trying to deal with, but I think Dato' Speaker, now we need to look at another pandemic which is even worse, namely the climate crisis, not climate change, and why this is relevant, because it is relevant since in Penang, according to our most important document, namely Penang Vision2030, Dato' Speaker, our core is that we become a green state, and when we become a green state, then we will address and answer this question of the climate crisis, Dato' Speaker, and to Dato' Sungai Dua, not only in Bagan Ajam when we do reclamation, and I answer your question regarding the components there. Indeed there are components that will also include affordable housing, and since it is a mixed project, Dato' Speaker and Dato' Sungai Dua, certainly we will have all the components that are needed, which will be required, such as perhaps low cost, medium-low cost and so on. That is a normal requirement under both our PBT's.

That is number one (1). Number two (2), I want to state regarding reclamation. The question that was asked earlier: reclamation will cause an increase in carbon emissions, that is what was the question, Dato' Speaker. So let me put it in perspective. Actually I can give you a few examples. The others are not yet complete, but one is already complete, namely Gurney Wharf, and Gurney Wharf is 115 acres, Dato' Speaker. Out of that, much will become green areas and so on. Because I have stated that in our battle against the climate crisis, which we have already experienced, we need to plant more trees, we need to have more green spaces in line with the Penang Vision 2030. And Gurney Wharf is the best example, it's going to be a green area, Dato' Speaker, which will then reduce carbon emissions and assist us in battling this crisis that we are facing. Not only that, Dato' Speaker, let me give one (1) or two (2) examples, because this question is so important and so relevant in the current situation. We in Penang also want to reduce vehicle use through other ways for us to travel. One of them…..(interruption) just give me one minute, one minute, I want to finish, very important Dato' Speaker, this one is extremely important for me, for you, for your children, for your grandchildren, very important…..(interruption).

Speaker (Speaker)EN

And I know. But summarise.

Member for Datok Keramat (Honourable Jagdeep Singh Deo A/L Karpal Singh); Let me finish, it's still early… just give me another one or two (interruption). I give you examples. Gurney Wharf as one. So Bagan Ajam, certainly we will have green area, no issues. This green area will help us fight the carbon emissions that are increasing, no. 2, and already executed Penang Smart Parking, Dato' Speaker. Let me just say why it is important for carbon reduction, reconcern footprint….(interruption)

Speaker (Speaker)EN

The core question is not related to Smart Parking, please proceed.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

The core question is carbon……..(interruption)

Speaker (Speaker)EN

Never mind, later when you wrap up,…(interruption) Thank you, Datok Keramat. I would like to invite question 20, please, go ahead.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

I want to answer, just give me one minute, one minute, Dato', if it's okay, one minute, that's all I have.

Honourable Speaker of the State Legislative Assembly; Answer the question that was asked, don't go off elsewhere.

We are giving a examples like Penang Smart parking how we reduce.

Speaker (Speaker)EN

He didn't ask about smart parking.

Alright then the others one is bicycle lane…..

Speaker (Speaker)EN

He didn't ask about bicycles either……

Yes, this is all important for us to reduce carbon emission…(gangguan) you see we can laugh about this but one day you all talk about all this and become even worst and I’m saying we all to be ready for this crisis otherwise it’s goanna be too late.

Speaker (Speaker)EN

Thank you, Honourable Member, concern…(interruption)

Datok Keramat, please answer about the type of housing and current prices. Wrap up, wrap up, later answer about Dream City...(interruption)... about the City housing just now.

Speaker (Speaker)EN

Already said there is mixed housing development. Question 20, please.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

Dato' Speaker, my question is Question No. 20. No. 20. Penang's Economy: (a) What is the economic impact, particularly on the Gross Domestic Product (KDNK) for the State of Penang, due to the COVID-19 pandemic? (b) What are the State Government's initiatives to ensure that income, achievements and economic growth remain robust and stable? (c)

Honourable Chief Minister; Thank you, Dato' Yang di-Pertua. Before answering the Honourable Member for Teluk Bahang, the experience in the Dewan Rakyat now is that Ministers answer in just 3 minutes, and the question is asked in just one minute. If we look at the Penang State Legislative Assembly, perhaps we should think about what is happening in the Dewan Rakyat. Limiting answering time is not the same as limiting debating time. To answer the Honourable Telok Bahang, the COVID-19 pandemic has affected the state economy through the implementation of the Movement Control Order (PKP) and the closure of the relevant economic sectors. Based on the Department of Statistics Malaysia (DOSM), Penang's KDNK for 2019 and 2020 is RM94,666 million for 2019 and RM92,631 million for 2020, which shows that KDNK contracted by 2.1 per cent.

The State Government's initiatives to ensure that income, achievements and economic growth remain robust and stable are as follows, which in fact I have already mentioned in the Budget speech. These include providing allocations for incentives to help the affected sectors, establishing the Penang Social Economic Recovery Consultative Council to discuss and take actions, and also the Penang Strategic Investment Advisory Council (Jawatankuasa ataupun Majlis Penasihat Pelaburan Strategik Pulau Pinang) to ensure continuous industrial development in Penang. This is also a communication platform between government agencies and the private sector, and the opening of industrial parks, as I have stated, to attract more investment and create more jobs in the State of Penang, and also to implement projects such as the Penang South Reclamation, infrastructure projects and so on, which will have a very big impact on the State of Penang.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

Thank you. Supplementary question. Thank you to the Honourable Member. We understand that during the pandemic and PKP many people stopped working, and they are part of the taxpayers to the Penang State Government. Now, is there a plan to ensure they return to work? Because some of those who stopped have become hawkers, and many have become hawkers among the fishermen. They are affected because they only depend on the market at the wet market, since all the night markets did not operate, causing at times a glut of fish, prices fell, and throughout the PKP period they also never received assistance again, such as for nets and the like. And we see another sector, tourism, like in Balik Pulau itself, we have….(interruption).

Speaker (Speaker)EN

The Honourable Member is only asking a question, you can debate later.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

No, I must say….(interruption) zoo and museums were affected because there was no attendance, and the last one is because of jobs. It is not our problem to find workers, we lack jobs. I was informed that industry has to take anyone who has hands, has legs, is enough, even if there is no certificate, because we have no foreign workers now, because we have no foreign workers now, and there is theft of workers, not like what Bagan says, people from Kedah come, there is absolutely no theft of plantation workers, even when bringing them from Cameron Highlands to Penang it is still not enough. How can we sustain if we don't have enough workers and we bring in investors?

Honourable Chief Minister; Thank you, Honourable Member Telok Bahang, for raising an issue that is very relevant today, when many people are discussing where the job opportunities are, but in Penang the opposite is happening. At this time we do not have enough workers for the sectors that have recovered after the transition to Phase 4. As the Honourable Member said, factories have to pay higher wages to attract workers and to poach jobs from other sectors, which causes the tourism sector, particularly hotels and F&B, at this time, even after the opening of interstate travel, the domestic tourism to rise very sharply.

Although hotels can achieve 100 per cent occupancy, most do not, and why not? It is not that they do not want business, but because some of their workers, during the period when the hotels were closed, had already looked for jobs in the manufacturing industry and so on, which during this whole pandemic still had many job opportunities. So the affected sectors lost workers to the manufacturing sectors, and hotels had to achieve only 80 per cent occupancy, not up to 100 per cent, because there were not enough workers to provide the proper service. So this is a new challenge, different from what we said about where the job opportunities are. In Penang we need to ask, where are the workers, especially foreign workers, who still face the challenge of the opening of the national border so that foreign workers in certain sectors are permitted to enter again to fill the vacancies needed by our economic sectors.

Speaker (Speaker)

Terima kasih.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Ask for explanation, a question cannot ask for explanation. This is actually my field….(interruption). Never mind, I too am interested in this issue. There are many worker vacancies, and most of the workers who come are from Kedah, and the Menteri Besar of Kedah does not know about that. I propose that we encourage many workers from Kedah to come here. Haa, so then I think Kedah is finished…(interruption).

Speaker (Speaker)EN

Okay, thank you, Honourable Member for Perai. Bring it into the EXCO to discuss thoroughly…(interruption)

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

Perai must understand, it is not a problem. When Penang had no private hospital workers, there were not even nurses. Where to find nurses in Kedah…(interruption).

Speaker (Speaker)EN

Enough… enough… Next, I invite question 21.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Honourable Dato' Yang di-Pertua of the House, my question is Question 21. No. 21. State the latest total number of Penang adult residents who have received the COVID-19 booster dose compared with other states? (a) What is the State Government's plan to urge the Federal Government to expedite the implementation of the COVID-19 booster dose for Penang residents?

Speaker (Speaker)EN

No answer.

Ada, it was on my table just now. Just looking on that…(gangguan)

Speaker (Speaker)

Seterusnya.

Yes, found it. Just found it, okay. Question 21 concerns the latest data on the booster dose and how the State Government will urge the Federal Government. Indeed we have been urging them until 29 November. The total number of booster dose recipients in Penang is 84,541 persons.

Speaker (Speaker)EN

Thank you for the answer…(interruption)

Not yet… not yet… wait… wait, the answer is not finished yet. I want to give the latest information on the booster dose. Okay, the Penang State Health Department is working together with PH Corp. or Protect Health under the Ministry of Health (KKM) to increase the involvement of private facilities in terms of number and also the addition of doses at facilities that are implementing the booster dose. As of 24 November, in the State of Penang there are 86 private clinics, 8 private hospitals and 3 offsite vaccination centres (PPV) involved in administering COVID-19 vaccines. From 22 November 2021, those who wish to register as a back-up list at private health facilities, namely as I mentioned just now, including at the offsite PPVs, namely at Flextronics PPV at the Tapak Ekspo Seberang Jaya and also at Sunshine on the island side, may contact the PPV directly or the private clinics and private hospitals listed on the Protect Health website, namely VaccineCovidProtectHealth.com.my. This is open to eligible booster dose recipients, especially those aged 40 and above, senior citizens, those aged 18 and above with comorbidities, and also frontliners.

So far, there are 503,000 people on this list who are encouraged to take the booster dose, and we have reached 84,541 at the moment. As for those who have not yet received the vaccine, perhaps they previously did not want to take the vaccine, but now they have decided to take the vaccine too, they can directly contact these PPVs by phone, or those who missed the second dose, perhaps at that time they were in quarantine. At present in Penang we are offering the Pfizer vaccine, but in the MMK meeting on Thursday recently, I was informed that earlier we had received an announcement from the Minister that Sinovac and AZ have also been approved, and in Penang we have a surplus of 200,000 Sinovac vaccines which we will open to those who do not want to take the Pfizer vaccine starting next month, in December, InsyaAllah.

The list of private facilities involved in the National COVID-19 Immunisation Programme (PICK) for the State of Penang, and also the media statement from Protect Health, I have listed just to inform you, in terms of the status of the State of Penang, our progress on booster doses, we are the bottom five among other states, even though we have increased booster doses. At the MMK Health meeting on Thursday, 25 November, I asked why we are lagging at the bottom. The answer I received is that other states such as Sarawak, Klang Valley, and also Johor, Negeri Sembilan, still have them, even though the Ministry made an announcement that all PPVs were to be closed, like Penang. We were supposed to close on the 15th, we received the letter, but we applied for an extension until 30 October. But many other states, because they had the issue of their vaccines expiring, gave booster doses in October before the PPVs were closed, and many, especially in Sarawak, continued to open PPVs, meaning the PPVs were not closed.

So that is why I now want to ask our fellow ADUNs here, and I have discussed with Protect Health, the way to increase booster doses in Penang is if the ADUNs have halls, because previously we opened mega PPVs, and all of that was borne by the government. Now Protect Health only pays the GPs and private doctors for the jabs, but there are no halls. But if in your respective constituencies there are halls, you all can reduce the cost of halls, MPKK or whatever, then GPs, private doctors and their clinics can open offsite PPVs, because most of their clinics can only do 20 to 30 a day. The big PPVs, the offsite ones like at Sunshine Bayan Baru, have a capacity of 1,500 a day. For example, the offsite PPV in Seberang Perai Tengah at the Tapak Ekspo by Poliklinik Bagan has a capacity of 1,600 a day, but 500 people who came entered the hall and went back because they wanted Sinovac…(interruption)..

Speaker (Speaker)EN

Honourable Member, wrap up.

Okay, just Flextronics in Bukit Minyak, 1,500. So now offsite PPVs can administer 5,100 booster doses a day….(interruption)

Speaker (Speaker)EN

For the question relating to vaccines and COVID-19, I understand that much information the Honourable Member can obtain from the website of the Ministry, that type of thing I think can be avoided…(interruption)..

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Mr Speaker, I think I will not ask questions that have already been reported, but what the Honourable State Executive Councillor has answered, the booster shot is of course very important for restoring economic activity and reopening the sectors so that we can move towards economic and social recovery in Penang. From the answer of the Honourable State Executive Councillor, if we look at the comparison with other states as mentioned earlier, we are indeed in ninth place. In the first place, Klang Valley, the booster shots already administered number 697,546, in Sarawak 648,885, compared with Penang, which currently has only 84,541.

Earlier I heard the answer given by the Cabinet (MMK) that in the other states this is because they have additional stock and they used the booster shot first, which is one reason why they started and obtained more boosters. So my question is whether this is a supply issue in Penang, whether we do not have sufficient supply of booster shot vaccines for us to carry out these boosters. My second question is, as mentioned earlier regarding Sinovac, we all know that many people, especially the Chinese community, are very unsure or have hesitancy about using Sinovac.

My question is what steps the government can take to convince the many people who still do not trust Sinovac so that they can be persuaded to come and receive this booster, because I think this is also an issue that has caused the booster shot uptake in Penang to be low at the moment, thank you.

Okay, actually, earlier, when I first raised this issue in October, yes, in the Pandemic Management Committee chaired by the Prime Minister of Malaysia, I did request that the booster shot appointments be expedited. We do not have an issue of Pfizer not being sufficient; we do have enough Pfizer. The problem was that when we first opened the booster dose, all approvals were given only to private clinics and private hospitals. At the beginning, there were about 48 clinics here, but because they could only do 20 to 30 each, and 8 hospitals, I raised this issue with the CEO of Protect Health, and our figures have increased. At one point we could do nearly 7,000 a day. And actually, the many that I mentioned, such as the offsite booster at the PPV, like at the Expo Site and other places, many senior citizens, when they came in and saw the vaccine was Pfizer, about 500 people a day refused. They wanted to wait for Sinovac, but there were also some who took it immediately. That is why I requested that Sinovac be allowed, and we do have an excess of Sinovac vaccine.

One more thing, the other one, which in other states apart from the vaccine that is nearly expired, is that they still keep their public PPV open even though they have received instructions to close it, but in our case we closed it because the cost of the PPV is also very high, and that is why we are now carrying out offsite PPVs. So as I mentioned earlier, please, if there are State Assemblymen (ADUN), if there are halls that can be used for offsite PPVs, give them to me, and I can give them to the President of the Medical Society, the Medical Practitioner Society, for them to... (interruption)

Speaker (Speaker)

Terima kasih…(gangguan)

Lee Khai LoonPKR · PHMachang BubukEN

Supplementary question on this vaccine. Earlier the Honourable State Executive Councillor mentioned Sinovac, and among the reasons mentioned yesterday, 500 people went to the PPV at the Expo Site and returned because they found out it was Pfizer. So I earlier heard that the Cabinet (MMK) had approved 200,000 doses for next month. I just want to get some certainty: how can we inform the recipients of the booster vaccine that they will get Sinovac, and not that they go there, find out, "Oh! Pfizer again." Sinovac is no longer available. Then it will create chaos at the PPV Centre. So I want to know whether the State Government has a system to inform people who did not go to get the booster that they will receive Sinovac on certain days. That is all from me. Thank you.

Yes, Insya-Allah, we will make an announcement and, you know, statements to the media. One more thing, but in any case, based on the efficacy data or the booster dose efficacy data, the best booster dose is still Pfizer and also AZ. That means that Sinovac, if after the second dose three months has passed, can be taken. The problem with Pfizer, as an example, is one of the issues faced by clinics, that's why

the clinics have to open offsite because they have to wait for six people before they can administer injections, so as not to waste Pfizer vaccine.

Speaker (Speaker)EN

Okay, thank you. I would like to call Question 22. None? Question 22 by the Honourable Air Putih, he is not in the House.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

I am ready to answer. May I?

Speaker (Speaker)EN

No, no. It is not necessary. Air Putih is not in the House, so the question is passed over. Please proceed to Question 23.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you to Dato' Yang di-Pertua. My question is number 23. No. 23. Is the Federal Budget 20-22 fair to Penang if a comparison is made of the taxes collected by the Federal Government from the people of Penang? (a) Of the seven (7) projects proposed by the State Government, how many projects have received allocations in the Federal Budget 2022? (b) List the programmes/projects for Penang in the Federal Budget 2022.

Y.A.B. Chief Minister: Thank you, Dato' Yang di-Pertua. To answer the question of the Honourable Bagan Dalam, according to the Department of Statistics Malaysia, basically Gross Domestic Product (KDNK) is a value-added concept. It is the total value added of all resident producers plus taxes less subsidies on products not included in the calculation of output. Based on the GDP of the State of Penang over the last three (3) years, Penang contributes between 6.7 per cent and 6.9 per cent to the national GDP. The Federal Government has announced the Budget 2022 allocation totalling RM332.1 billion. Of that amount, RM75.6 billion was allocated for development expenditure. The estimated allocation for 2022 approved for the State of Penang is RM996 million, which is equivalent to 1.3 per cent of development allocation. If a direct comparison is made with its contribution to GDP, the State of Penang should receive an allocation totalling RM5.2 billion. That is a difference of RM4.2 billion. That is according to our percentage contribution to National GDP, taking into account the amount allocated in the Federal Budget 2022. We should have received RM5.2 billion, but in fact we only received RM996 million or RM0.99 billion. The State Government is aware that balance of development between states and regions is important to ensure that all Malaysians can enjoy the results of development.

However, the Federal Government should consider a higher development allocation for the State of Penang. The State of Penang has proposed seven priority projects to be implemented under the second Rolling Plan of the Twelfth Malaysia Plan (RMKe-12). The approval status of the projects is still unknown because the State Government has not received a detailed list of projects approved under the Federal Budget 2022. The estimated allocation approved for the State of Penang is prioritised to the economic and social sectors. The economic sector covers 63.9 per cent, Security 4.4 per cent, Administration 2.7 per cent, and Social the remainder. The State Government has not received the list of projects as I said earlier. The Penang State Development Office has informed that development projects approved will be updated by all Ministries in the myProject system in January 2022.

Speaker (Speaker)EN

Thank you, Honourable Member.

Satees A/L MuniandyDAP · PHBagan Dalam

Soalan tambahan.

Speaker (Speaker)

Sila.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Yang di-Pertua, the Right Honourable Chief Minister for answering, and I am shocked by the answer received. Although we are a contributor of taxes, one of the highest tax contributors in Malaysia, we are often treated as stepchildren by the Federal Government, and it is often said that developed states do not need many allocations, which are channelled to states that are supposedly not so developed. This is an injustice, and how does the State Government plan to overcome this problem? Because every year we contribute a high GDP to the Federal Government, but what we get is less, and every year the budget that we, we are tabling in this House...(with permission), is a deficit. Does the State Government have any method or other mechanism to receive grants or to obtain what we are supposed to receive from the Federal Government in the form of taxes to the Federal Agencies, or indirect taxes that we can impose on the Federal Government, or indirect fees from those, companies that obtain licences from the Federal Government? Thank you, Dato' Yang di-Pertua.

Y.A.B. Chief Minister: Thank you, Dato' Yang di-Pertua, thank you to the Honourable Bagan Dalam for the supplementary question. Indeed, the State Government often raises the issue of injustice in terms of allocations to the State of Penang, considering that the State of Penang has limited sources of revenue. Therefore it requires development allocations from the Federal Government,

but although our GDP contribution is so large, what we receive is less than it should be. And recently, on Tuesday last week, on the occasion of the meeting of the Prime Minister with all Menteri Besar and Chief Ministers, where the presentation of the Twelfth Malaysia Plan (RMKe-12) was given at that meeting, I voiced the dissatisfaction of the State of Penang because it was not given treatment commensurate with the role and contribution of the State of Penang, and I asked the Minister of International Trade and Industry (MITI) and the Minister of Finance to look at the State of Penang. Do not always, we understand as I answered, balance between states, regions and so on, some states need more allocations. Especially for Budget 2022, six states were given attention: Sabah, Sarawak, Kedah, Kelantan, Terengganu. There is one more that I do not remember, but we understand that they too need allocations. But for the State of Penang, to continue to play, I raised, continue to play the role as an industrial state that contributes to GDP, contributes to exports, contributes to surplus, we need more infrastructure projects. I mentioned in PKIP, we are opening new industrial parks, but we need allocations to implement infrastructure projects, before these industrial parks can be completed, land readiness to receive investors. So I hope the Federal Government will be fair to the people of the State of Penang and give development projects more than RM996 million for the year 2022 when we are entitled to receive at least RM5 billion. Thank you.

Thank you, Honourable Member, Dato' Yang di-Pertua.

Speaker (Speaker)

Sokong penuh.

I want to raise something a little. So, is the distribution of allocations in the Penang State Budget 2022 distributed fairly? I want a written answer, that's fine. The breakdown of distribution, all districts including the Sungai Dua area and other areas, so that it is fair, and secondly, is the distribution of allocations to the people in all areas under the administration of the local authority (PBT) distributed fairly, because all the people pay taxes. Sungai Dua pays taxes, house assessment tax and so on, but is this distribution commensurate with the tax contribution from the Sungai Dua, Bertam, Penaga areas and so on? The return to those areas, whether commensurate or not with the tax contribution that has been generated for the State Government. That is the first, and insya-Allah I will try to discuss to obtain some amount of development projects in the area, only, YB. Padang Kota, please give me the list... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

The stance, the stance of Sungai Dua, do you support that we are treated as stepchildren by the Federal Government? We need equal treatment. Does Sungai Dua agree?

From one angle. From one angle, we are a state that has developed and advanced; when it has advanced, perhaps its allocation is rather less.

Satees A/L MuniandyDAP · PHBagan DalamEN

The Leader of the Opposition must state his stance first.

I also want to ask the stance on the distribution to the Sungai Dua area and so on.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

May I interject?

Speaker (Speaker)EN

Do not interject.

Y.A.B. Chief Minister: Although the Leader of the Opposition does not want to state the stance that the State of Penang should receive more allocation than the Federation, I am trying to use the logic of the Honourable Sungai Dua. If, according to what we say, if the tax contribution is higher, we should receive a higher allocation. So using this logic, we know that tax payments from the areas mentioned by the Honourable Member, compared with DTL or Pulau, are indeed not commensurate. But our stance is that we still continue development. That is more important. But in contrast to what we are saying, we also want to uphold justice. We want to keep advancing. A Chinese proverb says: "you want the horse to run fast but don't give food to the horse", like the State of Penang, a horse that runs so fast in terms of socio-economic development, we need infrastructure projects but do not get them. Therefore we need to use methods such as PSR, PPP and so on. For example, PSR is one example. The method of using land yield to finance LRT projects. As we have said since the first day. That is the method we use to overcome the lack of allocation from the Federation.

Speaker (Speaker)EN

Thank you. YB. Horse? (laughter).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

But the allocation received from the Federal Government was not mentioned at all? How much did Abah give, not mentioned at all?

Satees A/L MuniandyDAP · PHBagan DalamEN

The Federation gives allocations to ADUN...(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Abah, Abah is in charge. Abah is in charge, Abah loves it, ask Abah.

Speaker (Speaker)EN

Look, look, look, I just pretended not to know and now I've been caught. Question 24, do you want to ask?

Ong Ah TeongDAP · PHBatu LancangEN

Mr Speaker, my question is number 24, I do want to ask. No. 24. Following the global climate change, does the State Government take that factor into account when drafting the Flood Mitigation Plan? (a) Is the method of energy and natural resources as practised in Singapore, China and elsewhere intended to be used? It not only helps the residents of Penang and reduces the effects of heat on the island.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker and the Honourable Batu Lanchang. Honourable Member, the climate change factor, or Climate Change Factor, is a parameter that is now taken into account during the preparation of hydraulic design simulation in the initial design phase before a flood mitigation concept is selected for further detailed design. The Nature-Based Solution method has not been applied directly. However, holistic flood risk management in line with nature and ecosystems, comparable to Nature-Based Solution methods, has already been emphasised in the Environmentally Friendly Drainage Manual (MASMA), which has been applied since the year 2000. New development must comply with MASMA by, among others, introducing water quality ponds, wetlands, swales, bioengineered channels and ecological plans for flood management. Another method that is emphasised is upstream water retention as an alternative to the common method of merely upgrading drains or rivers in downstream areas only. For example, the High Impact RTB Sungai Permatang Rawa Project, which we are now redesigning using the upstream water retention method so that we can save land acquisition costs as well as solving the flood problem. At present, the Penang State Irrigation and Drainage Department, as an effort in holistic flood management, is constructing the Alma Flood Retention Pond in SPT and is in the process of procuring works to implement a dual-function flood mitigation project that optimises the use of open areas with flood mitigation components at Solok Van Praagh in cooperation with the Penang Island City Council (MBPP). So there are various methods we use, some of which have Nature-Based Solution characteristics, and some

that we are using now are more about retaining water in upstream areas rather than focusing only on upgrading drains and rivers. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

Ong Ah TeongDAP · PHBatu LancangEN

Supplementary question, Dato' Speaker. Since one of the components of the Penang2030 Vision is to make Penang a sponge city. So does the government plan to improve construction methods that are more environmentally friendly than grey to green, such as converting back rivers that have been concretised to their original state, as well as using bioswales to reduce pollutant waste before the water is channelled to the retention pond. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Batu Lanchang, for the supplementary question. Honourable Member, government agencies indeed respond to and support the Penang2030 initiative, which focuses on planning green-oriented projects, particularly for new projects, subject to site conditions and site space. Your proposal, namely adopting the grey to green approach, for example restoring rivers that have been concretised to their original condition, as well as using bio-sway, is in fact a good idea and is in line with the concept of Nature-Based Solutions. However, we can only consider it if the area we intend to develop has sufficient river reserve space. I believe the Honourable Member is also aware that one of the problems faced in Penang when we want to carry out Flood Mitigation Projects is that river reserves are often insufficient or there is already development, whether lawful or unlawful, on our reserves, especially in urban areas. So it is not so easy for us to do. Nevertheless, to control pollution, the State Government considers that control at source is the best approach to controlling and reducing pollution in our waterways. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

I have no supplementary question. I only ask that you include grey to green for the dead rivers in the Sungai Dua area and in three places that cause flooding: three at Merbau Kudung, Air Itam and also in the area next to Jarak.

Speaker (Speaker)EN

Thank you. Question 25, please.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Dato' Speaker. My question is question 25. No. 25. How reasonable is it, in terms of law, for Kedah to claim RM100 million a year as royalty for the leasing of Penang? (a) Apart from not entertaining Kedah State's claim, what efforts and strategies does the State Government have in dealing with the diplomatic issue between Penang and Kedah?

The Honourable Chief Minister: Thank you, Dato' Speaker. Thank you to the Honourable Machang Bubuk for the question, and it was in fact also asked by the Honourable Batu Uban, who did not manage to submit a question yesterday. So, to answer this issue: this issue touches on the Federal Constitution and the State Constitution of Penang, under which the State of Penang is a sovereign state in the Federation of Malaysia since independence in '57. This is the National Constitution and the State Constitution. Clearly, the State of Penang is recognised as a sovereign state in the Federation of Malaysia. Accordingly, the State Government of Penang and the Federal Government have no need to consider any claim from the Kedah State Government, and when the sovereignty of the State of Penang is questioned, I, together with the State Government, and I believe all Members of this House, whether government or opposition, are called upon to defend the sovereignty of the State of Penang. The State Government urges that any allegation regarding this issue, namely that the State of Penang belongs to the State of Kedah, should be carefully examined and be given an in-depth and comprehensive assessment from the legal aspect, so as not to cause unnecessary confusion and anxiety among the people, especially the people in Kedah and in the State of Penang. That is all.

Speaker (Speaker)

Terima kasih.

Lee Khai LoonPKR · PHMachang Bubuk

Soalan tambahan.

Speaker (Speaker)EN

Yes, Machang Bubuk.

Lee Khai LoonPKR · PHMachang BubukEN

Okay. Wait. My supplementary question: I want to identify from the Chief Minister what the role of the Federal Government is in this matter. In this regard, I see that they seem to endorse the irresponsible statements issued by this Menteri Besar of Kedah. Earlier the Chief Minister also mentioned that the Chief Minister also attended the Prime Minister's Meeting of Menteri Besar and Chief Ministers chaired by the Prime Minister. Was this issue also raised by the Menteri Besar of Kedah? If he wants to claim anything from the State Government, is he claiming from the Federal Government? He should be looking to the Federal Government for royalties or compensation. Thank you.

The Honourable Chief Minister: Thank you, Honourable Machang Bubuk. At that meeting, I did not hear the voice of the Menteri Besar of Kedah at all, in a forum involving the Prime Minister and all Menteri Besar and Chief Ministers, raising this issue. Perhaps the Most Honourable Menteri Besar of Kedah did not dare to mention it at an official meeting, but only dared to say it outside through statements or responses to the media. So far, we have indeed not received anything. If the Menteri Besar of Kedah is so serious about this matter, he should write to the Federal Government clearly and explicitly regarding this matter. .....(interruption)

Okay, I want to ask one thing. I am also a Penangite, born in Penang. Does the State Government of Penang have accurate historical evidence in rejecting this issue, and what action will be taken if there is clear and authentic evidence related to this matter? Secondly, can the Penang State Government and the Kedah State Government sit down and discuss to resolve the problem? I too am worried, and the people below me are also troubled and tense from hearing this story. .....(interruption)

As Chairman of the Focus Group on Historical Heritage and so on, there is also such evidence at the USM level. There is evidence, we have done a comprehensive study of history and so on. If possible, let us sit down, take these facts, and resolve it so that it does not become a problem. I also want this matter to be resolved promptly so that it does not become a major problem.

Satees A/L MuniandyDAP · PHBagan DalamEN

It will only be resolved when PAS is no longer the government in Kedah.

The Honourable Chief Minister:

Thank you to the Honourable Sungai Dua. In addition to discussions in accordance with the very clear principles of law and the Constitution mentioned earlier, not only the Federal Constitution, the State Constitution, the Kedah and Perlis State Boundary Act that took place in 1986, and before that the Federation of Malaya 1948, the dispute should not be raised. The State of Kedah has never made a claim that the State of Penang is part of Kedah. Through these processes, it shows that since the early 1990s there has been no dispute regarding the sovereignty of the State of Penang. It has never been disputed. But if any university or experts in history or culture wish to examine the origins of history, they are invited to do so, and perhaps if we look further, the Buddhist influence and Hindu influence in this Northern Region can clearly be investigated. However, in terms of the principles of law, it is very clear that the State of Penang is a sovereign state and cannot be questioned. Thank you.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Speaker, just one moment.

Speaker (Speaker)EN

Not even one. Please sit down. I must also follow the rules and principles of law.

Satees A/L MuniandyDAP · PHBagan Dalam

Dua minit.

Speaker (Speaker)EN

Not even two minutes. Please sit down. Honourable Members, the oral question session of 1 hour 30 minutes has now ended in accordance with the Standing Orders of the State Legislative Assembly (DUN). So, please, Honourable Chief Minister.

The Honourable Chief Minister: Honourable Dato' Speaker, the answers to the questions answered earlier will be given to Members and also included in the Official Report.

Speaker (Speaker)EN

Thank you. Okay, Honourable Members, we now return to the debate session on the Bill that has been tabled together with the Motion on the Development Estimates for 2022. I would like to invite Honourable Members who wish to take part in the debate.

Heng Lee LeeDAP · PHBerapit

Dato’ Speaker.

Speaker (Speaker)

Mana?

Heng Lee LeeDAP · PHBerapit

Berapit.

Speaker (Speaker)

Oh, sila.

Heng Lee LeeDAP · PHBerapitEN

Greetings of peace and hope to Honourable Dato' Speaker, Honourable Members, gentlemen and ladies who are with us in this honourable House. I thank you for giving me the opportunity to take part in the debate on the Supply Bill and Development Expenditure Estimates 2022, which carries the theme "Mempercepat Pencapaian Penang2030" and which was successfully tabled by the Honourable Chief Minister. I would like to take this opportunity to thank the frontliners for protecting public health in our state. The COVID-19 pandemic situation has not yet returned to how it was before. So I hope the frontliners will take care of themselves while serving the community. Dato' Speaker, I would first like to touch on an issue in the Berapit State Assembly constituency. First, the Bukit Mertajam Rest House. For ten years the Bukit Mertajam Rest House, or BM Rest House, has been neglected. Since I was elected as the State Assemblyman for Berapit in 2018, I have always been concerned about this place. Several times I asked about the status of this place, but the answer I received was that this area would be used by the Bukit Mertajam Hospital. However, now the Bandar Perda Clinic has been completed and outpatients from the Bukit Mertajam Hospital will be sent there. So this place will certainly not be used by the hospital. The open land must be fully utilised. Recently, I received a letter stating that the CMI has informed that it will use this open land. I very much look forward to this project being successful later. I am of the view that this area is very suitable for teenagers and families to carry out activities. Moreover, it is near four (4) schools, namely Jit Sin Independent High School, SMK and SK Convent, as well as SJKC Kim Sen, and also the Institute Bukit Mertajam, which has more than 4,400 students. Within a radius of 500 metres there are already about 4,000 students. So I feel this strategic and good place is very suitable and can be fully utilised. I am very pleased with the announcement by the Honourable Chief Minister that the State Government will set up Penang2030 centres in every KADUN as shared spaces for community activities next year. Together with the EXCO for Youth and Sports, who also announced the construction of Youth Centres in every KADUN during the previous sitting of this House. This is a suitable opportunity for families, in line with the Penang2030 mission, which is based on families. So I feel this open land is suitable for a Youth Centre and for families, not only in the Berapit area but throughout Bukit Mertajam. I myself have asked the CMI about the progress of this open land, and I was informed that they need to carry out a placemaking exercise to understand the needs of the local community. And the process of assessing local needs requires a cost of RM20,000. I agree with this process to ensure that the public are in a safe, comfortable and attractive place. I hope this project will receive support from the State Government. The location of the BM Rest House is in the heart of Pekan Bukit Mertajam. And Pekan Bukit Mertajam is an old town that is increasingly losing its economic competitiveness. By revitalising the BM Rest House into an attractive shared space, I believe it can become a catalyst for the economy of Bukit Mertajam. I am also informed that the Jalan Betek Stadium will create a place for e-sports, and this is greatly anticipated by the youth. But I also want to mention here. It must be understood that every young person has different interests.

So we need a place for them to carry out activities together. Another attraction of the BM Rest House location is that Pekan BM is a memory for the elderly. Those who were born and raised in Bukit Mertajam. This open land can be made into a place where the elderly can learn, exercise, read and much more. Bukit Mertajam lacks places for arts, play, exhibitions and facilities that are conducive to the community. I believe that with good infrastructure, Bukit Mertajam can be brought back to life and move towards the Penang 2030 mission. Next, I would like to touch on the digital library. The Phase 1 digital library of Penang Island was built in 2016. And it received a good response, with a total of 5,579 usage accesses. In 2019, the Phase 2 digital library was built with an estimated 188,000 people. Looking at it now, there are four (4) digital libraries in Penang, of which three (3) are on the Island side and only one is on the Seberang side, namely in Butterworth. The residents of Seberang Perai are very anticipating this digital library. And I am often asked about the proposal for when a digital library will be set up in Bukit Mertajam. However, the answer I received through a written question in this sitting of the House is that there is no proposal to set up a digital library, given that there is already one in Butterworth. I feel this decision can be reviewed because, looking at the population and land area, Seberang Perai is larger than the Island side. According to the book Penang Socio-Economic Basic Data for 2016, the total population is 1,725.8 million, of which 791.8 million are on the Island side, but Seberang Perai has 933.9 million. As for land area, the Island side is 292 square kilometres. But Seberang Perai is 740 square kilometres. If the Island side has three (3) digital libraries, Seberang Perai should have an equal or greater number according to population and land area. I once visited one of the digital libraries on the Island side and I myself saw that 90 per cent of the users were students who read and studied there. Our community lacks an open space, which makes this digital library very popular as a place for them to gather and study. In Seberang Perai there is only one digital library, in Butterworth. If members of the public from Bukit Mertajam want to use the digital library in Butterworth, the round trip alone would take at least one hour or more. I feel their parents may not have time to send their children to a digital library that is far away. So this matter cannot benefit students across Penang. I received an offer from the Jit Sin Old Students' Association for the State of Penang to propose using the first and third floors of their building as a digital library, with areas of 120 square metres and 300 square metres. This is because the building has two proposed floors with a parking capacity of 50 cars. Its location is near Pekan Bukit Mertajam and surrounded by the High School, SMK Jit Sin and Convent BM, which have large numbers of students. This is a strategic place. The association of Jit Sin students also offered this several years ago to the State Government, but they said no decision had yet been received from the government. In July and August this year they have once again sent a letter to the State Government. So here I want to show two letters from them. One is dated 23 July. An offer of cooperation to set up a digital library in Central Seberang Perai in the building of the Jit Sin Bukit Mertajam Old Students' Association, and another letter which is more detailed is the details of the building proposed for setting up a digital library in Central Seberang Perai in the former building of the Jit Sin Bukit Mertajam Old Students' Association,

dated and issued in August. Attached to this letter are also the approval letter for the Building Plan, as well as the location plan, building sketches and so on. All of these show that the Jit Sin Old Students' Association is sincerely offering their building so that it can benefit the community or students throughout SPT, especially in Bukit Mertajam. Dato' Speaker, I am of the view that this digital library should not only be used to access digital books but also as a place for discussion for many students. Bukit Mertajam lacks an open space for students. So now many students have to go to cafés or coffee shops that are more modern to make them their spot to hold brainstorming sessions or study and discuss together. I propose and hope that the State Government can consider setting up many digital libraries in Seberang Perai, given the higher population density compared with the Island side. The next issue: bring Penang back to the Silicon Valley. Penang was once known as the Silicon Valley of the East, where the E&E industry, namely electrical and electronics, which lasted for 47 years, before losing its influence to China. The trade war between the United States and China has opened opportunities for Penang to rise again. Penang is one of the areas in Asia competing for chains and supplies that want new locations or lower tariffs. Foreign direct investment into Penang increased by 1360 per cent, which is approximately RM8,500 million in the first quarter of 2019, when the trade war had just started. And the E&E industry gained many benefits; for example, I know that Hotayi Electronic opened its second factory with an area of 350,000 square feet, which was larger than its first factory in that year, namely 2019. And now the company has begun expanding its factory again this year, which is expected to bring 600 high-paying jobs. This shows that the Penang State Government needs more industrial land to support the needs of investors in the Industrial Revolution 4.0 era. I welcome the good news that PDC is developing two new industrial parks in phases, namely Batu Kawan Industrial Park 2 and Batu Kawan East, with an area of 1,500 acres, and they are expected to begin operating in 2023 and 2024 respectively. While we wait for the new industrial parks to be ready for use in 2022 and 2023, I hope we still have wide industrial land so that we can attract investors, especially international investors. I would like to ask whether the industrial parks in this state still have land lots exceeding 5 acres so that they can be supplied to investors who will have a major impact on the state's economy, and how PDC can handle the demand for land by international investors or big investors in 2022 and 2023 before the new Industrial Park is completed, so that the state's industrial parks do not lose their competitiveness against our neighbouring state. Dato' Speaker, I would like to touch on Eco-Tourism. Penang's Eco-Tourism has long been a tourist attraction for the world, but the tourism sector has also been badly affected by the COVID-19 pandemic. At the moment our tourism is still not open to international tourism. So I am of the view that the government should seek opportunities to develop more domestic tourist attractions. Among them, Eco-Tourism is one of the products with very high potential. I understand that the State of Penang recently approved a special site to develop an SPU Eco-Tourism centre near Pinang Tunggal, Kepala Batas. The SPU Eco-Tourism centre here shows its high potential because it is close to attractive places and natural attractions. I have visited that place and I agree with the State Government's decision. The attraction of SPU Eco-Tourism is not only a sale of local agricultural products, such as visiting fruit and vegetable orchards, but also tourists can enjoy the natural environment. For example, cycling in the surrounding paddy fields. That location will certainly attract tourists from this state and also from northern Malaysia. Dato' Speaker, I was very surprised by a recent news item announced by the Kedah State Government. Yes, the Kedah State Government, which is led by PAS. The Kedah State Government recently announced a ban on tourists taking boats to Pulau Songsong via Penang, and that government, I feel, is not only, as my colleagues in this honourable House have said, bullying the State of Penang. But I feel that in this case it is also bullying tourists from Penang. With the accusation made by its EXCO for Tourism that tourists who enter by boat from Penang to Pulau Songsong cannot help their economy, but only leave rubbish at that place. So that restriction was made so that tourists from Penang cannot enter by boat or waterway. I was very shocked by this accusation because all governments that develop the tourism sector will only try their utmost to make it easy for tourists to enter their own state. Unlike what has been announced by the Kedah State Government. Given that our neighbouring state does not welcome tourists from the State of Penang. I am of the view that this is the golden time for us to diversify tourism products so that tourists stay in Penang. By this we also show Malaysians or world tourists that Penang is a state that values freedom, namely freedom, and is friendly to tourists. It does not prevent tourists at will as our neighbouring state does. I welcome the allocation by the State Government totalling RM50 million to revitalise the tourism sector next year. I suggest that the State Government give more attention to the Eco-Tourism that we are now going to develop, such as upgrading access roads...(interruption).

Speaker (Speaker)

Yang Berhormat.

Heng Lee LeeDAP · PHBerapitEN

Just one minute, Dato' Speaker. Because Eco-Tourism places are usually in more rural or remote areas. Their access roads are usually smaller. So I respectfully ask the State Government to develop access roads in the places we intend to develop as Eco-Tourism so that our tourists can access the place more easily, and also my proposal to operate a shuttle bus to bring tourists from the Island side to the Eco-Tourism area on the mainland, in order to diversify tourism products for this state in the Post COVID-19 period. Finally, I thank the various parties who helped to prepare the 2022 Budget Plan. The COVID-19 outbreak has brought changes to the face of the world, and the challenges ahead of us are great. Returning to normal life as before COVID-19 is a major challenge for everyone. With a State Government Budget that is caring towards the people, I am confident we will win. With this, I respectfully ask for support.

Speaker (Speaker)EN

Thank you, Berapit. That was quick. Honourable Member for Permatang Berangan. Please.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Thank you, Mr Speaker. Assalamualaikum W.B.T., good morning and greetings of peace. (Prayer). Above all, we ask our God for help and guidance. Blessings and salutations and all praise be upon our great Prophet Muhammad S.A.W. Allow me to extend my respects to the Honourable Mr Speaker, the Honourable Deputy Speaker, the Right Honourable Chief Minister, and the Honourable Members of the Executive Council, the Honourable Leader of the Opposition and the YB.-YBs of the Opposition, the Honourable Members for Penang, the heads and representatives of departments and agencies, the media, secretariat staff and all observers. Alhamdulillah, thanks be to God for this opportunity. Let us together express our deepest gratitude to Him. By His grace and permission we are able to be here to sit in the Second Meeting of the Fourth Session of the 14th Penang State Legislative Assembly. Once again, Permatang Berangan thanks you for the opportunity to take part in debating the Appropriation Bill and the Development Estimates for the year 2022, under the theme "Mempercepat Pencapaian Penang2030".

Honourable Mr Speaker, Permatang Berangan welcomes the State Government's efforts in planning actions to accelerate the achievement of the mission and vision of Penang2030, by setting aside all differences of opinion and being ready to unite in order to overcome the COVID-19 pandemic and help revive the people's economy. Referring to the 2022 Budget Speech of the State of Penang, tabled by the Right Honourable Padang Kota as Chief Minister last Friday, Permatang Berangan would like to congratulate him on the tabling. However, several matters need to be emphasised to ensure that the financial allocations finalised in the 2022 Budget achieve their targets and objectives. Having studied the passages of the speech, Permatang Berangan sincerely hopes that the State Government's plans to realise the main focus of economic recovery for the people can become a reality. The 2022 Budget of the State of Penang will not achieve its objective if only the State Government feels comfortable, while the people are still sorrowful and depressed, held back by unresolved problems such as poverty, inadequate basic amenities, rising prices of goods, burdensome inflation, and an increase in crime rates and social ills that are becoming increasingly worrying. What are we, the Honourable Members and ADUN, if we are not sensitive to these problems and do not know every view and analysis that we put forward? Our economic policies will concern not only the country in the form of figures and statistics, but more so the lives of the people, namely children's education, the price of goods, and our friends in the city, the villages and the rural areas who struggle to obtain good opportunities and facilities. What we do here today, in determining the budget every year and deciding it in this noble House, does not only affect us as Honourable Members, but all the people who are waiting for good news on renewal and development in their lives.

Honourable Mr Speaker, before continuing the debate on this budget speech, Permatang Berangan would like to ask the Right Honourable Chief Minister, in the presence of this noble House, how far the achievements of the 2021 Budget have been realised. Did the focus of the 2021 budget, themed "Transformasi Pemulihan dan Ketahanan Ekonomi Ke Arah Dimensi Baharu Terbilang", with its four main strategies, meet its objectives? Under the first strategy: investment performance, industrial potential, the success and sustainability of agriculture, livestock and fisheries, and the tourism and heritage industry. Were its objectives achieved? Under the second strategy: transport networks, telecommunications access and community digitalisation, sports and recreation infrastructure, and a clean and safe environment. Has it achieved its objectives? Under the third strategy: the liveability of the people, welfare, well-being and health of the people, as well as the sustainability of water supply. Has it achieved its objectives or not? And under the fourth strategy: strengthening the role of the family institution, women and youth, human capital development and education, and upholding the religion of Islam without disparaging other religions. Has its target been achieved? Therefore Permatang Berangan sincerely hopes that the Right Honourable Chief Minister can provide a detailed answer, backed by data, on the performance achievements of the 2021 Budget before we fulfil the responsibility of approving the 2022 Budget.

Honourable Mr Speaker and the august House. Permatang Berangan agrees with the implementation of assistance to the people and groups affected by the COVID-19 pandemic through the special aid package for the people of Penang, which has been implemented by the State Government since this pandemic struck last year. Such assistance should be continued to encourage the people to restore their lives after being struck by this outbreak. These aids will be an incentive for the people to revitalise economic recovery after COVID-19. Permatang Berangan commends the State Government for being able to cooperate with the Federal Government despite differences in background, for the sake of the survival of the people of Penang. The opening of Vaccination Centres (PPV) for the 2-dose immunisation of adults, adolescents and target groups, as well as the opening of COVID-19 Screening Centres (CRC), has achieved the goal of containing this outbreak. Warm congratulations to all parties, including departments, agencies, frontline workers, leaders and the people of Penang, who have united in efforts to break the chain of transmission of this outbreak.

Honourable Mr Speaker, it cannot be denied that the manufacturing, construction, services, tourism and investment sectors are the biggest contributors to the economy, and they require hard work to revive the economy of this state after COVID-19. Although their growth is rather slow, more aggressive efforts need to be implemented to overcome the current economic decline. In the present situation, Permatang Berangan can agree with the State Government's proposal to accelerate the achievement of Penang2030 through the 3 main initiatives outlined. Among other things, the implementation of these efforts will contribute towards the redevelopment of this state's economy, which has been affected for more than a year. Referring to the answer to my written question number 14, the number of unemployed persons in Malaysia in 2020 was recorded at 711,000, of whom 30,600 persons or 4.3 per cent were from the state of Penang. To overcome or reduce this unemployment problem, Permatang Berangan would like to propose that the State Government build networks with Federal Government agencies and private companies to open more job opportunities, especially for young people and youths who have left school or further studies, as well as groups who lost their jobs during the pandemic, so that they can become part of the driving force for success that contributes to the socio-economic recovery of this state.

Honourable Mr Speaker, apart from that, Permatang Berangan can also agree with the establishment of the SMART Centre, which provides exposure and efforts to increase the capacity of companies in the fields of trade, industry and entrepreneurial development. This is because more than 300 small entrepreneurs and traders in Tasek Gelugor in particular can also enjoy this opportunity. In addition, the provision of interest-free loans under the PEKA Scheme valued at RM45.0 million is hoped to help micro, small and medium entrepreneurs in restoring their business performance. In this regard, Permatang Berangan would like to suggest that the State Government, through the relevant parties, improve monitoring and scrutiny of the procedures for selecting and approving these loans, so that all eligible applicants can benefit without leakage, abuse and bureaucratic selectivity by the party approving the applications. Besides that, the Harapan Loan Scheme (SPH) has enabled 3,662 hawkers and small traders to enjoy this facility up to 31 August 2021. This is for those who are registered with SSM. In this regard, please also look at those who are not registered and who became small traders or hawkers after the pandemic because they lost their jobs, so that they too are eligible to apply for assistance to have the opportunity to expand their businesses. In addition, emphasis should be placed on women entrepreneurs, who generally form a large part of the workforce that helps boost the economic development of Penang. In this regard, Permatang Berangan would like to propose that the One-Off Special Aid Package be given to Women Entrepreneurs as an incentive to empower their economy ahead of the endemic phase. In support of efforts to empower women economically, Permatang Berangan can also agree with Padang Lalang on the proposal of (TWOAS) Top-Up Women-Only Additional Seats...(with permission) to achieve 30 per cent women as a main policy determinant.

Honourable Mr Speaker, Permatang Berangan would like to turn to the basic needs of the people, especially in the Permatang Berangan State Constituency area, Tasek Gelugor. Here, allow me to draw the attention of this noble House to refer to issues related to the area. Firstly, Permatang Berangan welcomes the efforts of cleaning and maintaining drains, ditches and drainage systems carried out periodically by State Government agencies through the Local Authority (PBT), the Land and District Office and the Drainage and Irrigation Department (JPS), so that no drains or ditches are blocked, causing flooding during heavy rain. Thanks are also recorded to Wira Oren, who also took part in helping to cut down trees and clear road access in the area when it was hit by a storm. However, what I want to stress here is the latest issue that occurred at Simpang Tiga, Pokok Machang, Pokok Tampang and, most seriously, at Taman Desa Ara Permai, Ara Kuda, during heavy rain several times recently, which caused severe flash floods in the residential areas of the area, believed to be caused by an unsystematic drainage system. It is hoped that there will be efforts from the State Government to look into and identify the causes of the flooding and what measures can be taken to overcome flooding again, especially when the monsoon season arrives at the end of every year.

Honourable Mr Speaker and the Honourable Members of this noble House. Once again, this issue has been raised before. Permatang Berangan would like to request the State Government, through the agency or the parties involved, to inspect the position of the street lights on main roads such as Jalan Lahar Yooi towards Lubok Meriam and Pokok Sena, Jalan Pokok Tampang, Jalan Hashim Awang to the entrance to Taman Sepadu and Taman Saga, Tasek Gelugor, as well as Jalan Jarak Atas towards Padang Chempedak. There are indeed street lights installed along those roads, but they still appear dark because leaves from big trees block the light and make the route gloomy and dangerous for road users at night. Urgent action is needed from the PBT to trim the branches or cut down the trees that are blocking the light from the lamps. In addition, Permatang Berangan would also like to record its appreciation and thanks to the MBSP team, which burned the wasps' nest in a tall tree that had long been raised by residents in Padang Chempedak. The action of the MBSP is greatly appreciated because it has helped resolve the residents' safety problem. Complaints were made to me at the Service Centre about many wasps disturbing people. The safety of children in particular, this matter is now settled, thank you. Honourable Mr Speaker, earlier it was also raised that the ADUN Permatang Berangan Service Centre has received many complaints regarding weak internet access, especially in the areas of Pokok Machang, Pokok Tampang, Permatang Indah, Ara Kuda, Labuh Banting, Nyior Sebatang, Lahar Yooi and Pengkalan Batu, where most residents cannot receive full internet coverage. A follow-up issue, Honourable Member. Many, especially parents, are complaining because they do not get internet coverage and are often left behind because there is no signal for that purpose. How can their children, as students, carry out online learning even though they are now allowed to go to school? Yet they themselves, as online traders, find it difficult to promote their sales without smooth and up-to-date coverage. Therefore, I humbly request the State Government's attention in accelerating efforts to meet the digitalisation of this new normal era with urgency.

Honourable Mr Speaker, there is another follow-up issue. The follow-up issue concerning the land filling of paddy fields continues to be a repeated complaint at the ADUN Permatang Berangan Service Centre. It is hoped that the State Government can provide up-to-date information on the status of paddy land in the Permatang Berangan area whose conditions have been changed, so that the complainants can receive an explanation. This matter also requires serious attention so that agricultural land that must be retained as rice planting ground is not lost. Another request is to ask the PBT to maintain the football field at Anjung Gelugor, opposite the Bakti Tasek Gelugor National Secondary School, so that recreational activities can be carried out more safely and comfortably. Currently there are only cable coils for the purpose of upgrading copper cables to fibre optic, which appear not to have moved and endanger users there. Therefore, I request urgent action by the PBT to resolve this problem.

Honourable Mr Speaker, another complaint from the residents of Taman Sepadu and Taman Koskam concerns the groups of stray dogs roaming in their housing area, causing discomfort and worry about the safety of their children, at the risk of being chased or bitten by these animals. The service centre has already made several applications, but these dogs seem clever and manage to disappear when searched for. However, I ask the PBT to monitor and take appropriate action to address this problem.

Honourable Mr Speaker, allow me to thank the Honourable Datok Keramat, who has given answers to my oral and written questions regarding housing in the Tasek Gelugor area. However, there are still questions that need explanation for the people of Permatang Berangan, especially concerning the answer given by him. I refer to question No. 5(a) on the provision of affordable housing or RMM, and based on records there are 19 developments in Tasek Gelugor involving eight (8) under construction and 11 that have been approved a Planning Permission Plan (Pelan Kebenaran Merancang, PKM), with a total mixed unit count of 5,167. However, after studying all eight developments under construction, I was able to identify that there are indeed affordable housing units totalling 3,250, but all of them are RMM C. There is no RMM A or RMM B, and for the 11 projects approved by the PKM, out of that total there are 660 units of RMM C and no RMM A or RMM B. Therefore, I would like to ask the State Government for the answer on the condition imposed by the State Government on housing developers who submit a Planning Permission Plan but do not include RMM A and RMM B, although development areas, for example in Tasek Gelugor, really need more RMM A and RMM B compared with RMM C, and what is the rationale or justification that allows developers not to build both types of RMM in the development plans they submit. I seek an explanation from the State Government so that the people of Permatang Berangan are satisfied with these answers and decisions.

Thank you. Please allow me to interject.

Member for Permatang Berangan (YB. Nor Hafizah Binti Othman) Please.

I am interested in the issue raised by Permatang Berangan and also in the Tasek Gelugor Parliament. That is related to the housing projects being implemented and to be implemented, so many, eight (8) being carried out, 11 under implementation, and perhaps already having received Planning Permission approval. But I see that apart from these small houses, whose number is not large, below 150, below 150, which I understand was previously a condition that developers building housing projects exceeding 150 units must provide low-cost or low-medium-cost houses, RMM A or B. So I see there is absolutely no RMM A and B, not that there are none at all, but absolutely none, for the projects being developed in the Tasek Gelugor Parliamentary area. What exists is only RM250,000 and above, where affordable housing is concerned. Is this becoming the new policy of the State Government in terms of housing, namely prioritising affordable housing valued at RM250,000 on the mainland side and RM300,000 on the island side? I may ask for this to be added in the explanation. Thank you.

Speaker (Speaker)

Sila

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Please give a brief explanation, Permatang Berangan. Just a little.

Member for Permatang Berangan (YB. Nor Hafizah Binti Othman) Okay. Please.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Okay, thank you, Honourable Member for Permatang Berangan, who raised the issue, especially on housing. I do not intend to give an answer because later the EXCO will wind up. However, earlier I was interested in the argument of the Honourable Leader of the Opposition that there is not a single unit like this in the Tasek Gelugor Parliamentary area. But today we are fortunate that we have the chairman of PERDA with us in this House. Perhaps we can invite the chairman of PERDA to share, because we know that one of the main purposes of PERDA's role is to develop truly affordable housing, especially in the areas around that location. Perhaps we could invite the chairman of PERDA to give a little comment.

Speaker (Speaker)EN

This is not the way. Discuss it outside. PERDA is not accountable to this House. Please.

Member for Permatang Berangan (YB. Nor Hafizah Binti Othman): Thank you, Dato Speaker. Thank you, Honourable Sungai Dua, for raising the same issue that is often a need of the people in our area in Tasek Gelugor. Thank you also to Pengkalan Kota for proposing that PERDA take action, and I am confident that Honourable Bertam has plans brought by PERDA, and most of the mixed development, indeed much of it, was also proposed by PERDA and PERDA Ventures Incorporated. Thank you. Mr Speaker, I emphasise this reply so that our side can give an explanation to the people, because many residents are truly seeking the opportunity to obtain homes to own, since many families in the B40 and M40 income groups who have been married for more than 10 years are still unable to own a home. Therefore, rather than renting but still not having ownership rights, it is better that they be given the opportunity to own affordable homes for the future.

Dato Yang di-Pertua, in order to build a healthy and aggressive society, especially to ensure the continued excellence of the performance of young people and youths, the Sports Centre can become the most positive venue for improving their stamina and physical endurance. Moreover, it is more a good place to hang out to avoid unhealthy behaviour. Here Permatang Berangan wishes to ask Bagan Jermal, as Exco for Youth and Sports, about the status of the construction of the Sports Complex in Pokok Sena. What is the latest status, and can its construction be realised? Before I sit down, Dato Speaker, I am almost finished, Permatang Berangan takes this opportunity to record our thanks to all the security forces, frontline workers and cleaners, all parties including local leaders and residents, especially in Permatang Berangan and throughout Tasek Gelugor, who have helped channel information and worked together with the ADUN Permatang Berangan Service Centre to assist groups affected in the effort to fight COVID-19. And it is Permatang Berangan's hope that the achievement of the goals towards recovery and economic improvement for the welfare of the people as a whole, and may the Penang Budget 2022 be beneficial and felt by all the people of this state. Thank you.

Speaker (Speaker)EN

Thank you. Bertam. Please, Bertam.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Thank you, Dato Speaker.

Honourable Mr Speaker of the State Legislative Assembly, Oh Bertam has already stood up.

Khaliq Mehtab bin Mohd IshaqBERSATU · PHBertamEN

Assalamualaikum Warahmatullahi Wabarakatuh, greetings of peace to all Honourable Members. Bismillahhir Rahmanirrahim, praise and thanks to the Divine, for with His abundance, bounty and grace we are all able to gather and sit in this noble House at a time when Penang is in the fourth phase of the National Recovery Plan (PPN). It often plays on our minds: when will we face the COVID-19 pandemic? Most of the people are thinking of the best way to continue their lives with the support of the government, whether at the State or Federal level, but life must go on; the fight to eradicate COVID-19 will not stop. The SOPs being enforced must be followed, and enforcement must be carried out without knowing weariness, and we must not be complacent about our surroundings. Perhaps now the people are already fed up or have become used to the rise in cases, and some have even stopped caring. Some regard it as no different from the news of fuel prices going up and down every week. Dato' Yang di-Pertua and Honourable Members, the COVID-19 pandemic has had a very profound impact on the country. Penang is no exception; it even once reached a daily infection rate of 2,400 cases, but thanks to the cooperation of all the stakeholders, we are now in the fourth phase (PPN). Bertam wishes to remind everyone: let us not be complacent, let us not be negligent, SOPs must always be prioritised. Bertam once again wishes to extend thousands and millions of boundless thanks to all frontliners and also volunteers who have helped the Federal Government and also the Penang State Government in carrying out the work of assisting the people in this pandemic. Bertam also thanks all the people of Penang who have shown dedication and a sense of responsibility to ensure that the COVID-19 pandemic can be contained for the welfare of all. Dato' Yang di-Pertua and Honourable Members, in the Penang State Budget Debate for the year 2022, there are several issues or hopes that Bertam wishes to raise. Bertam would like to bring up once again the problems in Bertam Kiosk, or the Bertam Perdana Town Centre, and Bertam once again humbly requests that the Bertam Kiosk area receive attention from the State Government. This area is a commercial area that is the economic hub of the Kepala Batas area and of the people of Kepala Batas. What Bertam wishes to voice is that it is already the second time Bertam has proposed in this noble House that Bertam Kiosk be elevated into a halal food hub in the State of Penang, but it still has not received a positive answer. Bertam hopes that the Bertam Kiosk area can be listed in the State Tourism Master Plan of Penang so that it can be made a new tourism product area in this state. Likewise with the proposal to create murals at the kiosk area for beautification of the area. Bertam very much hopes that the Seberang Perai City Council can channel some funds for this purpose. Bertam understands that perhaps now is not the right time, but Bertam humbly requests that the relevant parties make an important note of this application. Dato' Yang di-Pertua and Honourable Members, Bertam also wishes to voice its hope and proposal to the Agriculture Exco and also any agencies involved in the Clam Farming Project in the area from Pantai Butterworth to Penaga. Bertam humbly requests that every application submitted be scrutinised carefully and that more opportunities be given to the fishermen's associations in the area. Clam farming can also become another activity to increase the income of the fishermen around Bagan Tambang, Padang Benggali and also Penaga. Dato Yang di-Pertua and Honourable Members, manufacturing activity in the Bertam area is not as impressive as in other areas...(disturbance).

Please allow me to interject. I am interested in the Clam Farming Project that has been implemented by the Agriculture Exco, clam farming in the area from Bagan Ajam to Penaga. Firstly, that area is used for clam farming, and that same area will also be developed into the Sea Reclamation Project. The consequence is that we will face losses. Secondly, the selection of participants. Bertam has raised it, and I also want to raise it, if possible, that we carry out the project through groups, or that NGOs and associations involved be established to obtain projects there. I see many siblings on that list, many parents-in-law and fathers too who received it, so this will not achieve our goal of clam farming in that area. Thank you.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Thank you, Honourable Sungai Dua. Dato' Speaker and Honourable Members, manufacturing activity in the Bertam area is not as extensive as in other areas, but the existence of this small industrial area at least creates room for opening employment opportunities for the surrounding community. What Bertam is concerned about is that there are still factories operating without licences, and this disrupts the lives of the local community. Factory areas that are set up, even on private land, should still obtain the proper approval from the relevant authorities. Although residents of the area have voiced the problem of these unlicensed factories several times, the response remains unsatisfactory. Must we simply close our eyes and let the people around us suffer as a result of errors and the lack of effectiveness in enforcing the law? Bertam is certain that if this factory were next to the homes of Honourable Members or close to the residences of government officers, complaints would surely pour in and action would be taken quickly. Nothing sprouts and nothing creeps unless there is truth to it; people do not gossip without cause.

Dato' Speaker and Honourable Members, Bertam thanks the State Government for allocating a total of RM71.137 million for the development of Islamic affairs in the State of Pulau Pinang. Bertam also wishes to thank the State Government of Pulau Pinang for providing an ex-gratia payment of RM50 a month to teachers at KAFA schools. For the information of Honourable Members, the breakdown of the salaries and allowances of KAFA teachers is as follows. First, the payment from the Department of Islamic Development Malaysia is RM1,000 a month. Second, the payment from Zakat Pulau Pinang is RM150 a month, and third, the State Government's ex-gratia payment is RM50 a month. The total is RM1,200 a month. The question is whether this ex-gratia payment is appropriate, or commensurate, for a teacher who works five (5) days a week or 20 days a month. Bertam would like to request that the Honourable Pinang Tunggal, as EXCO for Religious Affairs, look into and reassess this ex-gratia payment for KAFA teachers. If possible, please provide a payment that is more commensurate with their position as teachers who educate our nation's children. Bertam also wishes to thank the authorities who approved the application and corrected the earlier oversight. Alhamdulillah, married female KAFA teachers will enjoy maternity leave benefits starting January 2022. These benefits should be given to these teachers, like the benefits enjoyed by other civil servants and private-sector employees. And Bertam hopes that male teachers who are married may also be given paternity leave...(with permission), to facilitate the registration of children and other matters that can be done during that leave period.

Dato' Speaker and Honourable Members, Bertam would like to raise a question on the effectiveness of the free bus service (CAT) in the Bertam area. It is understood that the CAT Bertam service has not operated since 4 April 2020 due to the spread of the COVID-19 pandemic and also because of the low number of passengers. Because its routes mostly pass through housing estates, and we understand that residents of such estates usually have their own vehicles, the use of the free bus service was indeed low, and it received little response. As a replacement, the State Government launched the Unlimited Travel Pass collaboration financing, or My30, on 1 March this year, using the Rapid Penang routes. This is a good approach by the State Government in helping low-income people who still need to travel using public services. Bertam would like to suggest that the Rapid Penang service be changed to new routes to facilitate school students, especially in the areas of Permatang Sintok, Permatang Rambai, Permatang Kuala, Permatang Pauh, Permatang Berah, Penaga 2 up to Padang Benggali. Students and residents in these areas face difficulties because there is no shuttle bus service, and this will certainly make it difficult for students to get to school in the said areas. Bertam believes it would be sufficient to have a daily bus for school students, namely in the morning and also after school ends. This service is greatly needed by residents in the surrounding areas mentioned earlier, and Bertam very much hopes that the State Government, together with Rapid Penang, can consider and refine this proposal.

Dato' Speaker and Honourable Members, Bertam would like to take this opportunity to congratulate and commend the Honourable EXCO for Youth and Sports, the Honourable ADUN for Bagan Jermal, for his efforts in refurbishing the Bertam Hockey Stadium, which has also been fitted with lights. However, we are still waiting for the full use of this Hockey Stadium in the future, insya-Allah. It is hoped that with Budget 2022, the Federal Government's allocations can be utilised by the State of Pulau Pinang for the advancement of sports in this state. And I quote from the highlights of the Federal Government's Budget 2022 for sports as follows: "RM159 million is allocated to build, upgrade and maintain sports facilities throughout the country, and RM50 million for cultivating an active lifestyle, namely Fit Forever and National Sports Day. And RM20 million has been allocated for the development of national e-sports, including RM5 million to establish a Drone Sports Excellence Centre." Bertam hopes that the State Government, especially the EXCO for Youth and Sports, can use this budget for the development of sports, whether traditional or electronic. Bertam also hopes that the spillover from sports programmes organised by the state in the Bertam area can benefit the residents around it. And one more thing, lawn bowls, or Boling Padang, also needs to be revived in the Bertam State Constituency. Bertam also requests that the EXCO for Youth and Sports allocate a small budget for the repair of the lawn bowls green at the MBSP Bertam Stadium, including the repair of the lights and the facilities surrounding the lawn bowls green. The MBSP Bertam Football Stadium also needs floodlights to provide facilities for football teams that wish to use the field or stadium at night. This means that matches, training, or any other use of the field can also be carried out at night and not be limited to daytime only. Bertam has made this request before, but until now it has still not become a reality.

Dato' Speaker and Honourable Members, Bertam would like to draw the attention of the relevant authorities, especially those directly involved in the construction of the project to widen the road from 2 lanes to 4 lanes along Jalan Kedah and Jalan Butterworth to Titi Merdeka, which passes through the Bertam area. Bertam requests that the Public Works Department, Special Projects, look into the problems faced by the users of that road. First and foremost, there is the condition of the signboards at the junction entrances to Kampung Padang and Lahar Kepar. Road users are rather confused by the signboards or direction signs, especially at night when it is very dark. The "U-turn" direction sign at the junction of Jalan Datuk Haji Ahmad Badawi in front of the Lahar Ikan Mati cemetery, and the "U-turn" at the junction entering Jalan Paya Keladi, this area is also quite dark at night because of poor lighting. And third, the cones placed for separation, dividers...(with permission), on the road also cause problems for users at night, especially when the road is changed suddenly without warning lights being placed. Bertam also requests that the relevant party review the cleaning of the road drains along the length of this project, because most of the new drains, these new drains, have already begun to be covered by sand and wild grass. We hope the relevant authorities can ensure that the project area does not inconvenience users and residents of the surrounding area.

Dato' Speaker and Honourable Members, recognising the reality that the difficulty of living through this pandemic does not discriminate by age, race, or place of residence, Bertam feels it would be good if the State Government of Pulau Pinang, under the leadership of the Chief Minister, who has a big heart, the Most Honourable Tuan Chow Kon Yeow, could channel the same allocation to all State Assemblymen regardless of bloc and party. At the Parliamentary level, most Members of Parliament have also received the same allocation. Recently, in the sitting of the Selangor State Legislative Assembly, the Most Honourable Menteri Besar of Selangor also informed that opposition ADUNs would be given the same allocation. Bertam requests that the State Government give us, the seven (7) of us in the Opposition Bloc, the same amount from the Special Account as State Government ADUNs. Let us avoid trivial politics in times of pandemic. The lives of the people must be valued, and Bertam believes the State Government leadership is very caring towards the people of the State of Pulau Pinang regardless of State Assembly constituency.

Dato' Speaker and Honourable Members, Bertam also wishes to take this opportunity to express thanks to the Federal Government for tabling Budget 2022, which carries the theme "Keluarga Malaysia Makmur Sejahtera", based on an emphasis on 3M or 3R, namely restoring livelihoods, recovery...(with permission), rebuilding resilience, resilient...(with permission), and catalysing reform, reformed...(with permission), where the Government has provided a large allocation totalling RM8.2 billion under the Keluarga Malaysia assistance, which will benefit approximately 9.6 million recipients, including the single group. Budget 2022 allocates a total of RM322.1 billion, which is the highest budget compared with previous budgets, and is a continuation of the assistance and economic stimulus packages announced during the administration of the Perikatan Nasional Government. This budget is intended to support the well-being and livelihoods of the people, ensure business sustainability, and drive economic recovery.

Dato' Speaker and Honourable Members, the COVID-19 pandemic has raised awareness among all of us that we must unite in combating this outbreak. The slogan "Kita Jaga Kita", which means that we ourselves are the shield to break the chain of COVID-19. Regardless of race, religion, age, and status of life, every one of us must comply with the SOPs. COVID-19 does not recognise Dato' Speaker, does not recognise Honourable Members, or ordinary people. If we fail to comply with the SOPs, the consequences will be dire. We have also learned to be patient when the pandemic strikes. We are taught to strive to overcome all the problems we face. Every calamity that befalls us surely has a wisdom behind it. Innama'al usriyusra, which means "Indeed, with hardship comes ease." And a pantun: Berakit-rakit ke hulu, berenang-renang ke tepian, bersakit-sakit dahulu, bersenang-senang kemudian. Insya-Allah.

Dato' Speaker and Honourable Members, in closing, Bertam wishes to request all Malaysians in general and Pulau Pinang in particular to continue supporting the Government's efforts to ensure that the chain of COVID-19 can be broken. Let us look after one another, insya-Allah, and we will become a caring Keluarga Malaysia. That is all. Wabillahitaufik Walhidayah Wassalamualaikum Warahmatullahi Wabarakatuh. Thank you.

Speaker (Speaker)

Terima kasih.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Dato' Speaker, may I touch briefly on the housing project raised earlier by...(interruption).

Speaker (Speaker)EN

Later, when it is time to wind up, please.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Okay, okay. Thank you.

Speaker (Speaker)EN

Batu Uban? Batu Uban first. Please, Batu Uban.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Thank you. Greetings of peace and greetings of reform from Batu Uban to the Honourable Dato’ Speaker of the House and to all the respected Honourable Members. First of all, Batu Uban would like to thank all frontliners for their sacrifices in curbing the spread of the COVID-19 pandemic. As everyone is aware, 2020 and also 2021 have been extremely challenging years for all our frontliners, and Batu Uban also extends its heartfelt congratulations to the Health EXCO, the COVID-19 taskforce and everyone involved in fighting COVID-19. Batu Uban also thanks Dato’ Speaker of the House for giving the opportunity to debate the Supply Bill and Development Estimates Motion 2022 that was tabled by the Honourable Chief Minister. Dato’ Speaker, Batu Uban would like to extend congratulations to the Honourable Chief Minister and the Penang State Government for tabling a budget that is the best for the people of Penang, although everyone knows that the country is facing the effects of the COVID-19 pandemic. Nevertheless, Batu Uban commends the proactive measures taken by the State Government with this budget, which places main focus on the economic recovery of the state.

Three (3) main sectors such as Manufacturing, Services and also Tourism have been given due priority in Budget 2022. We understand that in the face of the COVID-19 pandemic, many IKS and PKS are affected. In my written question that I submitted, I asked about the number of businesses that have gone bankrupt, closed down and ceased operations during the period of the Movement Control Order (PKP), and I have obtained information that, based on the statistics of the Employment Insurance System of the Social Security Organisation (PERKESO), a total of 4,554 businesses have been forced to stop operating since the COVID-19 pandemic began, namely from March 2020 until 12 November 2021. Meanwhile, the number of local job losses due to the implementation of the Movement Control Order is 13,009 people who have lost their jobs. Dato’ Speaker, I welcome the assistance from the PEKA PKS scheme, which provides loans of up to RM20,000 for a period of 30 months with a moratorium for the first six (6) months, because I believe that assistance like this can give hope and support to them to face this very challenging period. Dato’ Speaker, with the establishment of the Penang Socio Economics Recovery Consultative Council, this council has the role of planning short- and medium-term strategies to stimulate the growth of the state economy. Based on the answer to my written question, I had earlier raised that about 4,554 traders have been forced to stop operating as a result of this COVID-19 pandemic. However, I also would like to recommend that the State Government, together with PERKESO, expand promotions to help the unemployed find new jobs. The CAT Centre, which functions as a job matching... (with permission), needs to be more aggressive in helping this group. Engagement sessions with the State Assemblymen should also be held so that we, as representatives of the people, can also jointly help those who are looking for work. Dato’ Speaker, for 2022, the State Government has allocated a sum of RM6.8 million for the Maximum Maintenance Fund 80% (TPM80). On this occasion, I, as the people's representative of the Batu Uban state constituency (KADUN), would like to record my millions of thanks and appreciation to the State Government and the Penang State Housing Board for channelling an allocation of nearly RM4.0 million for 29 projects from 2018 until 2021 in KADUN Batu Uban. However, I would like to convey some feedback received from applicants, namely that they have to wait a very long time to obtain approval. There are management corporations (JMB) or management committees (MC) that have paid or settled their share of 20 per cent, but they still cannot carry out the projects because they are still waiting for approval. I also would like to request the Penang State Housing Board to review the procedures, and also that bureaucratic red tape must be handled as well as possible, and critical projects must be given consideration with urgency. One more thing, YB. Dato’ Speaker. I have been informed that outside there are residents from Centrio Avenue who came to the House to hand over a memorandum to the Honourable Member for Penaga. Centrio Avenue is a low-cost flat located in my area, namely at Jalan Permai, Bukit Gambir. For the information of Dato’ Speaker, and also the respected Members of this House, when I was the people's representative, I helped the Centrio Avenue apartment flats apply for 80:20 assistance to repair their roofs that were leaking. This project was a project from Boon Siew, and after we carried out the repairs, through my efforts obtaining assistance from the 80/20 fund, we carried out the repairs, and the contractor was appointed by the Penang State Housing Board.

However, less than one year later, leakage occurred again in the same area, in the same place. I have written many times about this matter to the Housing Board, and unfortunately I was informed that the contractor who was appointed had disappeared, that he had closed down, so that within the warranty period, which is less than one (1) year after the repairs were carried out, the same thing happened, but we could not take repair action because the contractor who was supposed to provide the warranty had disappeared and claimed that his factory and company had closed down and he could not help. For more than two (2) years this matter has dragged on. I have also brought this issue to the Housing Board, but still there is no solution. The solution given by the Housing Board is to ask the MC or JMB to reapply for the 80:20 fund. However, the matter raised by the residents is why they must once again pay out the 20 per cent share, since they had already paid that 20 per cent before, but within just one (1) year the same problem, the same leakage in the same place, has happened again. Therefore, I would like to request the State Government, to the EXCO for Housing and also the Penang State Housing Board, to take serious action so that we can resolve this matter. And if possible, I would ask the Housing Board to carry out the repairs again without asking for contributions or the 20 per cent share from the residents, because in my view it is not fair for the residents to have to spend their money again, as it involves very high repair costs. I take this opportunity to request the Housing Board to take action immediately and carry out the repairs without delay. Dato’ Yang di-Pertua, the environment of Batu Uban commends the State Government's action that places emphasis on and also addresses the issue of climate change, and also protects heritage, habitat and water resources. I have received the answer that the State Government has taken steps to gazette 5,386.77 hectares as permanent forest reserve. 70 per cent of the permanent forest reserves in Penang have been designated for the purpose of protecting water catchment forest areas. Therefore, I would also like to ask the State Government about the large-scale development project on Pulau Jerejak. I would like to propose to the State Government that it strive to gazette Pulau Jerejak as a UNESCO heritage site. Dato’ Yang di-Pertua, everyone takes note that Pulau Jerejak is well known as the first leper colony isolation centre in the world in the early year of 1926. At that time there was no medicine or vaccine that could cure the disease, so it is the responsibility of the state government to be committed to and to preserve the heritage of Pulau Jerejak and to obtain UNESCO status. Earlier, former Deputy Minister of Tourism, Arts and Culture and Member of Parliament for Balik Pulau, Honourable Dato’ Muhammad Bakhtiar Wan Chik, also put forward this proposal to the State Government. As the State Assemblyman for this area, I will also give full support if Pulau Jerejak can be granted or become a UNESCO heritage site.

Phee Boon PohDAP · PHSungai PuyuEN

Excuse me, I would like to inform this honourable House that Pulau Jerejak was gazetted as a Permanent Forest Reserve on 26 March 2020. The Government Gazette is PP number 322 and the area is 285.84 hectares, all of which has been retained and there has been no progress apart from what was sold by the previous government. This has been done, namely every

land was sold by the previous government, while the rest has been gazetted as permanent forest reserve.

Speaker (Speaker)EN

Thank you. Continue

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Dato’ Yang di-Pertua, I would also like to propose to the State Government the installation of a rubbish trap system in drains to keep rivers from being polluted. This rubbish trap system can be used by applying technological systems such as the modular floating rubbish track and also the anti back flow rubbish track. This system is able to tackle and also minimise the most significant problem, namely rubbish in river drains and also water pollution. By using this systematic and innovative management system and method, and this system has been proven to be successful and also able to save rivers and preserve sources of life. I received feedback from JPS that there is an average of one tonne of rubbish collected per day in the Sungai Pinang drains. There is approximately one tonne of rubbish collected per day in the Sungai Pinang drains. To ensure that this rubbish cleaning programme is successful, cooperation is needed between two agencies, namely JPS and also the local authority (PBT). JPS as the implementing agency and also the maintenance agency, and the PBT must carry out the cleaning of the segregated rubbish. Dato’ Yang di-Pertua, in KADUN Batu Uban I often receive complaints from residents regarding problems with the cleaning contractors of the Penang Island City Council (MBPP). There are MBPP contractors who were awarded tenders but failed to carry out their duties well. Among their failures are not following the schedule, not meeting the required number of workers, working only when complaints are received, and MBPP does take action by imposing LAD, but the contractors pay it and repeat the offence because the penalty is very small. MBPP's supervision is also not firm, namely the supervisors fail to take firm action. Batu Uban would like to propose to the Penang Island City Council that contractors who fail to perform their duties well, or contractors who receive many LADs, must be removed immediately and replaced with new ones. Require contractors to submit daily written reports, and MBPP officers must also be diligent in going to the field to monitor these contractors. I have also received complaints that only the same contractors obtain tenders even though their records are not very good, and there are also contractors who merely change the company name and join the new tender process. It's just going round and round. They only change the company, but it is the same person who runs the company, so I would like to request MBPP to examine thoroughly the background of every contractor who takes part in the tender process, and new contractors must also be given the same opportunity. Dato’ Yang di-Pertua, Penang has now moved to phase 4 of the National Recovery Plan, but as the Honourable Chief Minister mentioned in the budget speech, we have still not fully won, we must continue to make efforts and take cautious steps by complying with SOPs and monitoring the spread of COVID-19 more closely.

However, what I myself have observed is that there are food shops, convenience stores or mini markets that do not monitor the SOPs of their customers. They do not check temperature, scan customers' MySejahtera, and also do not provide log books for those without gadgets. Social distancing is also not observed. I call on the Ministry of Health (KKM) and also the PBT to take this matter seriously and carry out inspections at all premises and take firm action against those who defy government directives. If possible, PBT should not renew the licences of traders who do not take the COVID-19 SOPs seriously. Dato’ Yang di-Pertua, before I end my speech, I would also like to request the State Government to examine the allocation in Budget 2022 to look after the welfare of staff, especially contract or political appointment staff who work at the service centres of each KADUN. There should be a scheme that is considered appropriate or the award of gratuity for the period of their service after their service has ended. When the Honourable Member is not nominated again or loses a general election (PRU), what will be the fate of the staff who have served for a long time and also contributed to the Honourable Member and also to the State Government. There are staff who are willing to resign from their jobs simply because they want to contribute or work with the State Government and also the Honourable Member. Batu Uban asks that we do not ask for RM100 million, but a little appreciation for these staff so that they can continue their lives. With this, I request to second the motion. Thank you.

Speaker (Speaker)EN

Thank you, Batu Uban. Yes, Honourable Member for Bukit Tengah, please

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Thank you Dato’ Speaker, for giving me the opportunity to take part in the debate on the 2022 Budget. I would first like to congratulate the Honourable Chief Minister on tabling the fourth budget for the state of Penang. Of course we know these two (2) years have been difficult, as has been debated by many of our State Assembly Members, and we have gone through a very challenging time. I want to state here that, were it not for the leadership of the Honourable Chief Minister and the entire EXCO of the Penang State Government, we certainly would not have succeeded in getting through the most difficult period of these two (2) years. Although Dato’ Speaker, with respect, we are under fiscal constraints with a shortage of revenue, we see in Budget 2022 that the Honourable Chief Minister still places the welfare of the people of Penang at the forefront, in fact by further increasing the allocation for development for 2022. And if we also look at programmes that benefit the people’s welfare, such as i-Sejahtera, in just these two (2) years, from 2018 until Dato’ Speaker, until 2022, the government has funded as much as RM100 million, RM137,106,000 in fact, for i-Sejahtera. Bukit Tengah alone has had RM3.467 million funded to benefit 23,141 recipients. Dato’ Speaker, I want to say here that in politics or in government our main goal is to bring positive change, a better difference, a positive difference, to the lives of the people of Penang and generally. We cannot have what we see here, which is extremely unhealthy politics of hatred and racial politics that we often see in the situation in Malaysia and Penang,

Penang is now the target of PAS, non-stop, PAS attacking Penang, not long ago... (with permission) Dato’ Speaker, the Secretary of PAS Penang equates Malay people, the Malay community, with the fate of the Palestinian people in the West Bank and in Gaza. This should not have happened, Dato’ Speaker. I want to ask our Honourable State Assembly Members from PAS, from UMNO, I want to ask here, has the State Government, in any of its policies in this State of Penang, ever oppressed or discriminated against the Malay community in Penang? I think not, definitely not. If we look at the Religious Affairs budget presentation for the State of Penang, it allocates RM71 million for religious affairs for Muslims. I have asked my office to make a comparison of the budget with the budget in Kedah. Kedah always likes to attack us, and indeed if we compare the budgets allocated in Penang and Kedah, our budget for Islamic affairs is far larger than Kedah’s. Far larger. Wait a moment, Dato’ Speaker, here are the figures, yes, we spend RM71.13 million on development allocations for the promotion of Islam in Penang. In Kedah there is only an allocation to the Majlis Agama Islam MAIP of RM3.5 million. We have the Gagasan Khaira Ummah 2030 Programme, Dato’ Speaker, I think Kedah does not have it. We also make payments and allocations to KAFA supervisors and teachers, Kedah does not have them, I think, to religious school teachers, to the people's religious secondary school teachers, teachers and staff of private Chinese schools also receive them, our tahfiz teachers receive allocations, Kedah does not have them. Teachers of pondok schools we give allocations from the state and also TADIS teachers and many more. If we compare with Penang, what I want to stress here is that there is certainly no oppression at all against the Malay community in Penang, but on the contrary, the Penang State Government is very caring in looking after the welfare of all the people of Penang regardless of background, religion and so on. When will we stop stoking this politics of hatred? I am very saddened, if I still remember clearly the words of the PAS President, with permission, Dato’ Speaker, excuse me, which have been carved in my mind, he once said, “if that leader is a Muslim, even if his oppression is at least able to make him a cowherd; if that leader is not a Muslim, he says, however good he is, in the end he will still go to hell.” I want to ask the State Assembly Members, is it right that the current Government, the Malay majority government in the PN BN cabinet in the Federal Government, can give land and a house worth RM100 million to a former Prime Minister who has been convicted in court of stealing the people’s money, can they? This is very shameful Dato’ Speaker, we must not forget also the Chief Minister... (disturbance).

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai Dua

Pencerahan?

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Yes, yes. Please go ahead.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Thank you Dato’ Yang di-Pertua, YB Gooi here is sometimes okay, sometimes not okay.

Speaker (Speaker)EN

YB, did you take a self-test today? Did you do a self-test?

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Yes, yes. Definitely negative.

Speaker (Speaker)EN

Definitely negative today, okay.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Today there is a check.

The issue concerning the allocation provided by the Government to the former Prime Minister, I think this matter was indeed agreed or decided, a decision was made that the former Prime Minister is eligible to apply, and he applied. Previously there was no PM, during Tun Mahathir's time onwards there was, Pak Lah also received it, so he applied after he fell, after he failed to remain Prime Minister in 2018, and I think it was not approved even then, so that is his entitlement.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Not enough time, later I will not be allowed to debate.

Speaker (Speaker)

Yes

Gooi Hsiao-LeungPKR · PHBukit TengahEN

I want to say my answer is simple, perhaps Sungai Dua is also not okay today. There is no government, although we will indeed give contribution to the Prime Minister’s contribution at normal times, but this consideration was made after learning that the Prime Minister stole the people’s money and has been sentenced by the court, that is the issue. Still being considered is the biggest scandal in Malaysia, not Malaysia, the biggest financial scandal in the whole world, 1MDB, during his time.

Speaker (Speaker)EN

Honourable Member, move on to other issues.

Gooi Hsiao-LeungPKR · PHBukit Tengah

Ya.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato’ Yang di-Pertua,

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Sorry, I apologise, later I will not be allowed time. The same goes for the Menteri Besar who always wants to target Penang, I don't know why he is so obsessed with Penang. Do the people of Kedah have no problems? I want to give one example, Bandaraya Getah in Kedah, which has been raised since 2011 in the Barisan Nasional manifesto, Aku Janji Barisan Nasional Election 2013. He said this is the best project to attract the young generation, it will offer thousands of jobs. That was in 2013, until today, Dato’ Speaker, Bandaraya Getah has no water, no electricity either. Go and solve the problems of the people of Kedah, don't come and create trouble in Penang, Dato’ Speaker. Dato’ Speaker, I want to state... (disturbance).

Satees A/L MuniandyDAP · PHBagan DalamEN

Bukit Tengah, just briefly about PAS and Islamic administration in this state, I want to add just a little, Dato’ Speaker. Regarding the view of Bukit Tengah, that PAS always spreads lies, usually PAS is the one who will slander Penang as oppressing Malays, oppressing Muslims and so on, but this is from my own observation. I have seen, since the Honourable Member for Pinang Tunggal took over the leadership of MAINPP (Penang Islamic Religious Council) and also Zakat, we see in my own area that when poor people ask for help, they now get it easily, not like before when PAS was the head of the Islamic organisation in Penang, they did not help the poor. Now, the other day, there was an auntie who asked for help for an eye operation, only RM6,000 a week was approved. So I do see that the assistance reaches the grassroots. So I congratulate the Penang State Government and Pinang Tunggal, who are so dedicated in their duties, and let us not listen to PAS’s slander, do not be afraid of PAS’s slander, continue to serve.

Speaker (Speaker)EN

Okay, enough, continue.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

I agree with YB Satees, in Penang the Government is very caring towards raising especially the young generation and women, that is why we have the Penang Youth Development Corporation with various programmes that we offer, and we have the Women's Development Corporation to develop the human capital of the youth and women of Penang. We want young people who can think openly, we want liberal, progressive, inclusive people, these are not words we should fear and avoid like ghosts, but for PAS all these words cannot be used, liberal is absolutely haram and cannot be used. But if we want to compete in the world, and if we want to be the best in the world, we must have people who are open-minded and creative, so that they can not only get jobs but also later they will create employment for others, ladies and gentlemen.

Dato’ Speaker, I would like to touch briefly on the allocations as mentioned by the Honourable Chief Minister regarding the allocations given by the Federal Government, I indeed agree with YB. Bagan Dalam too, we are indeed treated as stepchildren, and it was mentioned earlier by the Honourable Member that we should receive RM5.4 billion a year based on our GDP (KDNK) contribution, which is the fourth highest in Malaysia. Last year our KDNK contribution was RM64.7 billion, Dato’ Speaker. But what we get back is indeed not balanced with what we give to the whole country. So we need, I agree with Bagan Dalam, a mechanism, Dato’ Speaker, that we can use so that we can then negotiate with the Federal Government to ask for what Penang should rightfully receive. Therefore I have previously proposed that an Independent Committee be established to study federalism issues, the relationship between federal and state, and make recommendations that will become a roadmap for Penang to ask for what the State of Penang should rightfully receive. One issue that I feel is very important, which we must bring to attention, Dato’ Speaker, is that the greatest threat to our civilisation, our children and our grandchildren, is the climate crisis that we have heard about earlier. Only last month we heard, and I myself read and studied the COP 2006, The Conference Of Parties in Glasgow. When reading about what is happening to our climate, the climate crisis is truly, Dato’ Speaker, very frightening. If we cannot control the rise in temperature of the whole world by 1.5 degrees by 2050, it is a very very scary situation for the whole world. In scientific reports, Dato’ Speaker, it is stated, maybe in the future, not maybe, most probably, some parts of the continent, places of considerable size, if people want to go out of their houses they cannot go out for more than 6 hours because it is too hot and our bodies cannot adapt, and we will die outside the house. If we want to go out of the house we must wear a special mask because it is too hot, polluted and so on. In Malaysia we will not be exempted from the effects of this climate crisis either. The Penang Institute has indeed previously issued a report stating that cities in Malaysia, including Penang, is experiencing rising temperatures over these 30 years, from 1988 until 2020, the weather has gone up by a lot. So we must have, I want to suggest here, we must have a, what is it, a roadmap, a proper action plan, we must have track assessment adapt, and to make an assessment of how we will mitigate the problems that will come in Penang. I welcome it, I understand that the Penang State Government has already started efforts to do accounting. That means to calculate how much carbon is emitted from the State of Penang, but I want to advise here, let us not follow the example of the Federal Government, which sent a report to the United Nations and was laughed at by the international community. The Washington Post a few weeks ago issued an investigative report mocking Malaysia's national report, why? Because it said our report in Malaysia seems like a report from another universe. Why did it say that, Dato' Speaker? Because we reported very strangely that trees in Malaysia are so special that they can absorb four times more carbon than trees in Indonesia. It said that is impossible, a myth, that our trees could be less than Indonesia's trees, but that trees in Malaysia can absorb carbon 4 times greater and faster than Indonesia.

Satees A/L MuniandyDAP · PHBagan DalamEN

Not surprising at all, the Minister of Environment is from PAS.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

So I want to say here that the Penang State Government is indeed concerned about the climate issue, but there must be a roadmap or a committee, a take action plan, to plan for the coming climate crisis. I am greatly encouraged by the Datuk Bandar Seberang Perai, who already has a mission to make MBSP (Seberang Perai Municipal Council) a Carbon Low Carbon City and has already allocated more than RM30 million for various programmes, which I do not have time to state, to achieve this mission. Mr Speaker, so I would like an explanation later during the winding-up, on what steps have been taken to address this climate crisis. I now return to issues in my constituency. There are not many, just a few, so allow me 5 minutes. One issue is the quarry issue, Mr Speaker. The quarry issue at Bukit Juru: the residents there have long been objecting to the quarry activity, which has brought no benefit, but on the contrary the people there are truly suffering from what is happening in the area. There are five (5) villages there, three (3) mosques, one school, and every day their lives have to bear various problems, from pollution to disturbance from lorries, and much more that I do not have time to mention here. The residents there have indeed previously brought this issue to the State Government, and the residents now fully support the government's decision to reject the 4C permit application that had been submitted by the quarry operator to carry out this quarry operation. What is their effort for, to enlarge the quarry area? That is the intention of the quarry party, the quarry operator, but unfortunately, Mr Speaker, the quarry operator has now begun a civil suit against the land administrator and also the State Government to claim compensation. I am here on behalf of the residents of the Bukit Juru area to state that the residents there completely oppose the civil legal action brought by this quarry operator against the State Government, and they will continue to support the State Government in fighting this unjustified legal action. Mr Speaker, the second issue I want to raise is regarding the Village Improvement Master Plan. I have raised this issue before. I have proposed that the State Government be asked to consider holding a village improvement plan to upgrade the condition of villages, particularly to resolve the problems of the drainage and sewerage systems that have long afflicted the villages. This is an issue that I feel needs to be done. There are 288 villages in Seberang Perai, and most of the village residents live in Seberang Perai, so we must, in moving forward, have a Village Improvement Master Plan. Also regarding civic infrastructure and assets, Mr Speaker. Civic infrastructure and assets are very important for the community wherever it is, the places where families and friends gather and carry out their daily activities. However, many of these assets have been neglected and need to be upgraded. I want to say here that almost all villages in the KADUN Bukit Tengah do not have playground facilities, public fields and sports courts as found in other housing estates, and at the same time there are still villages that do not have public amenities, village halls, such as in Kampung Sekolah, Kampung Kebun Sireh and also Bukit Kecil Juru.

I want to say here, Mr Speaker, that there are 3,000 residents in Kampung Sekolah, 1,200 residents in Bukit Kecil Juru and 3,880 residents in Kebun Sireh, according to the recommendation of the Department of Town and Country Planning (JPBD), that if an area has between 2,000 and 5,000 residents, a village hall must be established. I would also like to mention here one more issue, regarding traffic jams or traffic congestion, particularly in the area of the junction of Jalan Chiang Heng Kai, Jalan Kebun Nenas and Jalan Bukit Tengah. This is a main arterial road, the north-to-south road of BM used by the public, but until today, with the increase in vehicles and so on, traffic jams frequently occur. I hope the government can look at how to solve this problem. Although I know, Mr Speaker, that the Public Works Department (JKR) once applied to the Federal Government for an allocation of RM350 million to widen the road from the Bukit Minyak junction all the way to Bukit Tambun, Simpang Empat, but that too was not approved by the Federal Government in the Eleventh Malaysia Plan. This is the problem, the problem when we are treated as stepchildren. The issue of the foreign workers' dormitory, just two more issues …(interruption).

Speaker (Speaker)EN

The Honourable Member did not keep his promise, make it short and summarise.

Member for Bukit Tengah (YB. Gooi Hsiao-Leung);

Just two quick issues. One (1) issue is regarding the settlements of foreign nationals in residential areas of Bukit Tengah, where, as we know, due to the lack of good control, all these foreign workers are gathered together in one house, and this has contributed to the problem of the spike in COVID-19 cases previously. I ask the government to further increase enforcement in these areas, particularly with the cooperation of the Department of Labour (JTK), using the existing Acts such as the Minimum Housing Act (Akta Perumahan Minima), the minimum standard that should be applied there. And the last issue is the flood issue at Kampung Dock. I hope that the government can look at how to resolve this problem. I know that the area is in a low-lying area, but the drainage system there and so on has long needed to be improved and upgraded. I want to say that it is not the fault of the Drainage and Irrigation Department (JPS). If we look at the efforts of the State Government, there have already been two (2) major projects carried out in Bukit Tengah. One is the RTB Parit 4, and the other is the RTB Parit 5. Since RTB Parit 5 was completed, there has been no flooding in Taman Mangga, Kampung Juru, Taman Pinang, Taman Sentul and Taman Sentul Jaya. So I would like to express my appreciation, particularly to the State Government and JPS, who have done a good job in resolving most of the flood problems in Bukit Tengah. Therefore, Mr Speaker, I request to support the budget that has been presented by the Honourable Chief Minister of Penang, thank you.

Speaker (Speaker)EN

Thank you to Bukit Tengah, next then, yes... yes... the Honourable Member for Bayan Lepas, please.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, Mr Speaker. Bismillahi Rahmanir Rahim Alhamdulillah Amin Alamin Wassalatu Wassalamu Ala Asrofil Ambia Mursalin Wa'ala Alihi Wasahbihi Ajma'in, Assalamualaikum Warahmatullahi Wabarakatuh Dan Salam Sejahtera. Thank you, Mr Speaker, for allowing me to use this space to convey several matters regarding my constituency. First, I offer my congratulations and compliments to the Penang State Government for successfully completing a comprehensive Budget covering various aspects, and secondly I also offer my congratulations because we succeeded in bringing our state out of the quite severe COVID-19 pandemic that occurred previously. Mr Speaker, every time the State Assembly sits, I may raise the same matters until the core or main issues can be resolved as best as possible, whether by the State Government or the Federal Government. The core issue or the first issue that is a problem for us in the DUN Bayan Lepas is the traffic jam problem, the traffic that still cannot be resolved, from Bukit Belah to Puspakom FT6. Every time the State Assembly sits, I raise the same matter, why? Because this is the matter that we, in that area, have to face daily, especially in the morning and on the way home from work. In my written question, I asked for some assistance or suggestions from the State Government, so that if we cannot widen that road at this time, what steps can the State Government take to help control or implement some assistance? For example, placing Royal Malaysia Police (PDRM) personnel or also road wardens by Majlis Bandaraya Pulau Pinang (MBPP). For your information, we sometimes see traffic personnel there, but that is occasional, and I have never seen, I think in a whole year I have never seen, any MBPP traffic unit on motorcycles there. So I ask that if the State Government also helps to ease the traffic problem at Sungai Batu, Teluk Kumbar, and preferably place two (2) personnel, it cannot be, for example, only at the Masjid Batu traffic junction, but there must be another one near Lexis. So I ask that there be an interim solution to reduce the traffic burden in that area. Second, the same issue, Pasar Teluk Kumbar is still a wasteland until now, the site has been visited many times, how many times has the Honourable EXCO answered, yes, some answered it is being tendered and so on, lastly what I was informed is that Pasar Teluk Kumbar has been issued an RFP. For us there, we do not care whether it is an RFP or borne by the State Government through MBPP. It would just be good if, through this RFP, it will be done in a mixed manner, and I was informed that affordable housing will be provided. On that occasion, I also ask that if this RFP has been or is being planned or has been put out to tender, the State Government or MBPP should include one element to provide a kiosk for the convenience of the people there, I mean a banking kiosk or a mini post office, because the population capacity of Teluk Kumbar and Sungai Batu is too large. If we want to go to the bank, we have to travel 7 km or 8 km, and to go to the post office we have to go to Bayan Baru or Batu Maung. So I ask that, if possible, this people's convenience element be included in the new market. Third is the matter of the Bayan Lepas clinic. In the last two State Assembly sittings, the Y.A.B. Chief Minister announced approval, approval for a new construction by the Central Government, the Federal Government, but until now the status, which I was informed in the answer to my written question in the previous sitting, is that the proposal to enlarge the Bayan Lepas Clinic or to build a new Bayan Lepas Clinic seems to have been stalled, or has even been withdrawn from using funds from the Central Government, when I was informed the answer was that the construction of the Bayan Lepas Health Clinic will be borne by private financing, wallahualam. How this private financing works, whether through an RFP as well or otherwise, but we have raised the issue of being treated as stepchildren and so on, and I see the Bayan Lepas Health Clinic is a major issue regardless of the source, we hope this matter or the Bayan Lepas Clinic with complete facilities can be established in the DUN Bayan Lepas area. So regarding the matters above, I hope that in the proposals in the budget presentation presented by the Y.A.B. CM there is a proposal for 111 projects in the RMKe-12 for the State of Penang, so I want to hope that these matters can be included as well. Deputy Speaker, when a settlement or area is booming with development, of course various problems arise. In village areas, water pressure is low. Indeed the location of Teluk Kumbar or Sungai Batu is at the end, so we want PBA (Penang Water Supply Corporation) to plan so that water pressure can be prepared for the future, when even now water pressure is very low in hilly areas. I can give an example in Sungai Batu, a hilly area, and also in Kampung Matahari Naik and Matahari Jatuh. Deputy Speaker, Alhamdulillah. Flooding in Teluk Kumbar, for the moment, we see it is not like before, rain for one hour, flood, one or two hours later it is worse. Alhamdulillah, the flood mitigation plan has been completed, the pump house is completed. Alhamdulillah, and a new bridge has been added which is being built, and I think it has been completed and will be officially opened on 10 December. A concrete and comprehensive solution, Honourable EXCO has just come in. Alhamdulillah, the RTB Teluk Kumbar has succeeded in resolving the flood problem, but it is not the complete solution. It is good that it is completed and so on, but not, not to say that once it is completed, activities have built a new bridge, there is no flooding, but after four (4) hours it floods again, or during extraordinary rainfall it floods again. So here I would like to call on the State Government to make a plan so that we can solve what we said earlier, that after one hour of rain it floods. Okay, now we have skipped another achievement, four hours, five hours before flooding, and preferably we there do not want to make people suffer, and we do not want it to flood completely, so we hope that JPS and the State Government can plan from the beginning for the next phase, to build retention ponds to upgrade existing drains and rivers, and also must plan how to acquire land when we want to enlarge the river or drain in question. Deputy Speaker, the second issue or second matter is regarding what has been proclaimed by our government, the Penang State Government, on the vision Penang2030 under Theme A, namely to enhance liveability to improve the quality of life. I am very pleased with the State Government project with an allocation of as much as RM60 million for my neighbour across the way, the Pulau Tikus area, namely the Gurney Wharf Project as the provision of green areas, congratulations. Maybe no one on the other side has eaten yet, I have not eaten yet. Mr Speaker, I will not say much more, we want to eat, yes. I also hope that my constituency in DUN Bayan Lepas remains green without having to sacrifice hilly areas and turning them into settlements for foreign nationals. Local people can use the beach reserve as it is now, continue to breathe fresh air, and further make the area a focal point for local people, as a place to live in to build family life with a better quality of life.

In this august House, I want to explain once again and state that I reject the plan to build a foreign workers' dormitory in Teluk Kumbar and Sungai Batu. It is clear because, for me, it is an opposition or contradiction to the aspiration of our state to make the Penang2030 vision, as we noted just now, enhancing liveability and improving the quality of life of the people of Penang State. From the district of Teluk Kumbar and Sungai Batu, and indeed the whole DUN Bayan Lepas, the best place to live for workers from Malaysia who contribute to our economy and our country. If we need, and really need, the provision of a foreign workers' dormitory, in the budget presentation presented by the Y.A.B. CM, we have been informed that the State Government through PDC is ready to provide as much as 1,500 acres of land in Batu Kawan, not Sungai Bakap. Sungai Bakap, to put foreign workers there en masse, I do not want that either, placing them in Pengkalan Kota, I do not want that either, because for me the placement of these foreign workers must be centralised …(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

The Honourable Member asks… The Honourable Member for Bayan Lepas, even if you do not want them, they have already been there for decades. So if this foreign workers' dormitory issue cannot be resolved, they will remain there forever.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

So it is best to do the best planning. To set up a settlement for these foreign nationals is not like opening a coffee shop, not like opening a burger store. Yes, good planning is needed so as not to trouble others. We want to solve one problem but we create a bigger problem. Ideally, if we could use my proposal, if permitted, to use the land that PDC intends to give for economic and industrial development, build it there. It would be easier, everything there, but what is being planned in my constituency is three settlements of 40,000 within a five-kilometre radius and also….(interruption) and also perhaps the Honourable Member… the Honourable Member does not understand what is happening…(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Bayan Lepas, I want to add a little. I just want to ask for an opinion….(interruption)

Deputy Speaker of the HouseEN

Bagan Dalam, what topic is this, the relocation of workers' dormitories….(interruption)

Satees A/L MuniandyDAP · PHBagan DalamEN

Deputy Speaker, two minutes of extra time. Bayan Lepas, I just want to ask one thing. If those who are now in Bayan Lepas work in industries in the area around Bayan Lepas, and if we want to place them in Batu Kawan, then every day they have to commute, that is one carbon, so they would need to use the Second Bridge. That is one issue. Another thing, what zone is this for Batu Kawan Industrial Park? What I have seen in Batu Kawan Industrial Park, I think my friend from Bukit Tambun, the companies or multinationals that build their companies there now. They build,

they provide workers' quarters in their own areas, yes, not all, but I have seen that some already exist, and I think one way too, when in future PDC or MBSB needs to make it a condition that if the factory they build is on 100 acres, they build the workers' quarters together with it. I have seen the workers quarters at…(Interruption)

Deputy Speaker of the HouseEN

Okay, Bagan Dalam, it is a good proposal, you can sit down…(Interruption) Bagan Dalam can sit down.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, Bagan Dalam.

Deputy Speaker of the HouseEN

If it comes to Sungai Bakap, you can bring those companies along too, not just the workers.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Like this, it is not that we, I explained from the beginning that we are not rejecting, but do careful planning so that we solve the problem holistically. We do not want this to be resolved, then complaints, and then we create something troublesome for a long period. Listen first to my argument. The first thing we are fighting, it is not me who is fighting, I am carrying the voice of the people. MPKK 16, my MPKK, DAP or PKR or Amanah, all reject it. Mosques and suraus have all signed the referendum memorandum. This is the voice of the people, we must accept it. The fishing unit rejects it. So if we do not use the referendum, what is the use of me as the people's representative? And most importantly, this proposed site will affect about 70 fishing boats or so that park in that area and moor their boats there, and this company wants to take the coastal reserve land included within their development area. So where will these fishermen put their boats, hang them on the flats? So we need to look at the whole picture, as I said just now. Do not solve one problem and create another. Do not put a curse on people's rice pot with sand, we want to fill our pot with biryani rice, that is what I mean, yes. And the location where they want to build, a hostel, at the fishermen's parking area, to shelter from the southern winds and so on. Second, we object because the location is very close to people's housing, public housing, low-cost flats, village houses and so on. I think, wherever it is placed, any YB may have a view, agree with me that this matter is not appropriate, that this placement should be separated. Do not include it in one community. Thirdly…(Interruption)…

I think it is good that the Honourable Bayan Lepas does not feel that not supporting or not rejecting is enough, but proceeds with the decision to reject. Because I think this matter has logic and rationale to reject, because everyone in that area rejects it. So do not

say "it's okay, not rejecting just now," continue the resolution of not supporting and rejecting, that is what I want certainty on. Do not hedge. We are not rejecting but continuing to firmly reject, because like I rejected the hostel project in Taman Teluk Molek, I rejected it but it was still built, that is the problem.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

I take up the spirit of the Opposition Leader, I reject it completely. We reject it because there are reasons, the Opposition Leader's reasons. Yes, if it is said I gave the example just now in Batu Kawan, because we see that the area in question is open land, the area at Teluk Kumbar and Sungai Batu is densely populated. How can we place 40,000 people there with no road infrastructure? In my argument from the beginning, in my speech from the beginning, even the road traffic problem now cannot be solved. How many sittings of the DUN already, and now we want to add the problem of bringing 40,000 foreign nationals, 40 people per bus, a thousand buses….(Interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

May I have way, Bayan Lepas?

Azrul Mahathir Bin AzizAMANAH · PHBayan Lepas

Boleh, boleh.

Deputy Speaker of the HouseEN

Bayan Lepas, just one more minute. We cannot allow many people to keep interrupting like this. Just one more minute, Bayan Lepas.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I admire the spirit shown by Bayan Lepas in representing the community in his area, and he has clearly stated just now that he rejects the State Government's project. So, my question to the Honourable Member is, if the State Government still continues this project, is the Honourable Member prepared to withdraw support from the State Government….(Interruption)

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Don't stir up trouble like that…(Interruption)

Satees A/L MuniandyDAP · PHBagan DalamEN

This is a people-minded State Assemblyman, he fights for the people….(Interruption)

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Seberang Jaya, don't think, Bayan Lepas is not like Seberang Jaya…(Interruption). Go, dear daddy.

Deputy Speaker of the HouseEN

Sit down…sit down, everyone asked to sit down….(Interruption)…Pulau Tikus, sit down..everyone sit down…just one more minute, Bayan Lepas….(continued)

Lee Chun KitDAP · PHPulau TikusEN

We respect his right to ....(Interruption).

Deputy Speaker of the HouseEN

Sit down, everyone asked to sit down.

Lee Chun KitDAP · PHPulau TikusEN

But do not instigate like this. Honourable Seberang Jaya, all of us sit down, let him answer.

Deputy Speaker of the HouseEN

Pulau Tikus, sit down, everyone sit down. Just one more minute, Bayan Lepas. It has been 15 minutes.

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

Thank you to Seberang Jaya for raising the spontaneous question. We, I did not have the slightest thought of withdrawing support as long as we can use the existing platform. This is my last platform after I met the Y.A.B. CM to carry the voice of the people. If they still do not accept it, what can I say? What the people want, we have already brought it.

Deputy Speaker of the House

Bayan Lepas.

Azrul Mahathir bin AzizAMANAH · PHBayan Lepas

Okey, okey.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Bayan Lepas, please give way to Pulau Betong.

Deputy Speaker of the HouseEN

Pulau Betong, wait behind.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

A question. For Pulau Betong to get to Bayan Lepas, one must pass through Jalan Teluk Kumbar. So I want to ask Bayan Lepas himself for a picture of it, even now there is already a traffic jam on Jalan Bayan Lepas. Just imagine, if…(Interruption).

Deputy Speaker of the HouseEN

Please ask Pulau Betong to properly wear a facemask first. Follow the SOP.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Okay, thank you, Pulau Betong.

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Please describe how, if the project happens, what will happen to the traffic or on the Pulau Betong – Bayan Lepas road?

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

That is what we mean. When you want to do something, you need great planning. We do not want to do great planning, we make a settlement of 25,000 foreign nationals with 6 blocks, 29 storeys, an exit road of 66 feet, four lanes, four lanes, but the road that exists now is 2 lanes. Where to go? Jump into the sea, I'm sorry. Okay, I think that is my explanation regarding the foreign nationals' settlement there.

Deputy Speaker of the HouseEN

Thank you. Wrap up, please.

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

More, there is still more. Okay, then on this occasion I would also like to raise an issue, namely the low-cost housing issue. This is an issue of the people, Dato' Deputy Speaker, where low-cost housing has no management. I humbly ask the State Government to help them build or set up a management body. We do not want, when the water tank leaks, what, the bill soars, and no one wants to repair it. Look for the YB. One water tank is RM25,000.00. So we ask, at the same time we can reduce water wastage and also help PBA in tackling the problem of stale debts. So we ask the State Government, whether MPPP, JAB and so on, please find a way so that a committee like JAB or MMC can also be formed to help them collect money and so on, because now, looking at these low-cost houses, they are really out of control, really cannot, even if we want to help, cannot. Once in a while, gotong-royong is fine, but

if it is every single day gotong-royong, even the Deputy Speaker will run away. Okay, I will summarise, there is a lot I have to skip. There are two (2) matters I ask the House Secretariat to correct the answers given to me. Regarding my written question number 15, which reads: "What is the total number of retail liquor sales licences issued in the Bayan Lepas State Assembly seat for the years 2018 to 2021". This one seems not serious, but this material is what PAS attacked me with. When YB. Penaga made a written question and published it on Facebook, "oh! YB. Azrul (AMANAH), up to 80 liquor licences, right?" Whereas when I looked at my question, I directly asked for the following names and the following addresses to be detailed. What I regret is that of the 114 new licences issued for 2018 to 2021, only 12 are in my DUN. The rest are not in my DUN. Indeed Batu Maung, Bayan Lepas; Pantai Jerejak, Bayan Lepas; Sungai Ara, Bayan Lepas; I ask that the officer answering the question on behalf of the State Government must know the electoral boundaries, through PEGIS and so on. Just like earlier, regarding the factory issue and so on, do not assume all those factories are in Bayan Lepas. In the Bayan Lepas area, my DUN area, there are only small factories. Those are all in Pantai Jerejak and Batu Maung. Then there is also the second, which needs to be corrected is question number 7, if I am not mistaken, my proposal for the construction of Rumah Mampu Milik on Lot 244, Mukim 9, Teluk Kumbar. But they answered it, the answer given was off-target to Mukim 12, Permatang Damar Laut. That one, the two that need to be corrected. The second and last is the allocation to strengthen the Islamic propagation. I thank the State Government which is so sensitive to Islam, Islamic propagation in the State of Penang, where a large allocation, RM71.13 million, has been planned and implemented for next year. Only, I want or I hope that MAINPP must be strengthened so that it can carry out responsibilities that benefit Muslims and not become a liability, and the agencies under MAINPP whose roles are unclear. Sick projects. Perhaps I do not need to be direct, they should be reviewed and the best planning made for the Muslim community. I also on this occasion congratulate Zakat Pulau Pinang which has served excellently and always cares about the people's issues. I was also surprised. Assistance to build new houses, from Zakat Pulau Pinang, and I have pursued it, RM73,000.00 per house. State how many thousand? RM56,000.00, previously RM42,000.00, right? RM56,000.00. And that is a good improvement. Square feet, it is single 800, and we are working on it in Kampung Masjid. And I also thank Zakat Pulau Pinang for contributing flood aid on 18.08.2021, which was delivered at the end of November to 259 families in Teluk Kumbar. Finally, I thank the EXCO for Youth and Sports for approving the upgrading of the Teluk Kumbar football field. Previously, if you played, the ball could roll on its own. The ground was uneven, but now it is in the process of being upgraded into a proper field, one that can be used for games and so on. And also a long jump track is being provided, and thank you also to YB. EXCO for Sports, for approving the upgrade of the futsal field in Sungai Batu, and I hope that for this DUN, one futsal court is actually not enough. I have already had a slow talk with YB. EXCO, one futsal court is not enough, we ask for one more, hopefully this time we can get one with a roof too, insya-Allah. God knows best. Once again, I thank everyone, the Chief Minister, YB. EXCO, all my fellow YBs, and also the civil servants who have worked with me for so long. God knows best. Assalamualaikum warahmatullahi wabarakatuh, I humbly ask to support the budget tabled by the Y.A.B. CM.

Deputy Speaker of the HouseEN

Thank you, Bayan Lepas. Please proceed, from Pulau Betong.

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Assalamualaikum Warahmatullahi Wabarakatuh, Peace and blessings. Honourable Dato’ Deputy Speaker, to all the Honourable Members, the EXCO of the Penang State Government, and all respected heads of department. Alhamdulillah, we have once again been granted permission to be in the Second Meeting of the Fourth Session of the fourteenth State Legislative Assembly (DUN) in this pandemic and new normal era. As the State Assemblyman for Pulau Betong, I welcome the tabling of the State Government's budget for the year 2022. As for the empowerment of women, I also welcome the tabling of the white paper on the task of increasing women's representation in this honourable House and opening up space for women politicians to become State Assemblymen. Members of the House, I also wish to draw the attention of the House to a problem that I will raise concerning my area of Pulau Betong, namely the problem of chicken traders who trade in public markets. My side has received a complaint from the Chicken Traders' Association regarding the directive to stop slaughtering activities at the market, which was enforced in June 2021. The directive has been complied with by the traders, but the traders respectfully request the good offices of the Penang State Government, especially the Penang Island City Council, to provide a slaughterhouse under Act 171, Section 73 (1)(e), which is provided for. Commercial slaughterhouse facilities have not yet been established in the island area to facilitate fresh chicken traders in carrying on their business and carrying out slaughtering activities systematically, as well as to maintain product quality and to keep the market area and the environment clean. As the State Assemblyman for Pulau Betong, I understand the grievances of these traders, and I respectfully request due consideration so that we may together look at this issue seriously to help these traders, and indirectly we can together protect the environment in a more systematic and environmentally friendly way. I especially hope that EXCO Datok Keramat will closely examine this matter and find a good approach that is acceptable to all parties. I have also forwarded this issue in writing to the Office of the Honourable Datok Keramat, and until now my side has not received any response. And I would be very honoured if this issue could be answered by the Honourable Datok Keramat during the sitting of the DUN in the winding-up speech later. To prove that the Pakatan Harapan Penang Government cares about the problems of the people, especially those raised by the Chicken Slaughtering Association, who have hoped that this matter would be brought by me to this DUN sitting. Members of the House, Dato’ Speaker, I thank the Honourable Paya Terubong, as EXCO for Tourism, who was creative in answering my question regarding the plan to develop eco-tourism in Balik Pulau. However, I would like to suggest several additional ideas. After this, I hope for the involvement of representatives from the local State Assemblyman's Office itself, especially representatives from Pulau Betong, to also take part in planning and developing eco-tourism in Balik Pulau. Besides that, representatives from industry players and the three existing eco-tourism operators in Balik Pulau should be involved together. I hope that the eco-tourism destinations in Balik Pulau that have been promoted by the State Government, especially by the EXCO for Tourism, will be detailed. I also request an explanation regarding the bird watching that has been promoted by the State Government, where the bird watching location is, when the most suitable bird watching season is, and what the upgrading plan at the bird watching site is.

I thank you very much for organising the Familiarization Trip to Balik Pulau. It is hoped that the eco-tourism products highlighted during the organising of the trip will be listed, and the eco-tourism destinations involved during the organising of the Familiarization Trip to Balik Pulau must also be stated. The production of promotional videos such as the video “The Other Side of The Island”, which aims to highlight the uniqueness of the Balik Pulau area, should also be increased. Therefore, I hope and also propose the establishment of an eco-tourism hub in Balik Pulau. All parties such as the District Office, the Penang Island City Council, the Council Members themselves, namely the EXCO of the State Government involved, the Ministry of Housing and Local Government, and the Ministry of Tourism, Arts and Culture should join forces to realise this idea. Members of the House, Balik Pulau, as one of the oxygen tanks of Penang, should be appreciated with environmentally friendly development projects and eco-tourism activities. Among them, the Pasir Panjang location has great potential to be made a centre for eco-tourism, recreation and leisure activities. Its beautiful beach with the refreshing sea breeze has the potential to be developed and upgraded as a focal place for visitors. However, the tar road connecting the town of Pulau Betong to Pasir Panjang needs to be widened to two lanes for the convenience and comfort of visitors. The proposal to build a jogging track and also a cycling track passing through the Pasir Panjang Beach promenade would be very attractive if this is developed. Secondly, the sunset view is also among the attractive places at the Pantai Malindo location, namely at Sungai Burung, where the construction of a unique and iconic jetty is needed and will become a new attraction at Pantai Malindo, which is located at Sungai Burung, Balik Pulau. Stalls selling fresh seafood, food and drinks really need to be upgraded, and parking space should be increased. Likewise, signboards and attractive directional signs to popularise this attractive place at Pantai Malindo. Likewise, to attract tourist attractions, among them the jogging track and also the cycling track need to be repaired and increased to attract the attention of visitors who come to Balik Pulau, especially here in Pulau Betong, to be upgraded and as. This is known as our role in popularising the area, namely in Balik Pulau. Members of the House, the Pakatan Harapan Government has led the Penang State Government since 2018 until now, and many welfare schemes have been implemented as suggested or mentioned by all our representatives today, namely reflected in the welfare of the people that has been brought by the Penang State Government. Among them is the i-Sejahtera scheme, which involves the elderly, non-working women, single mothers, persons with disabilities (OKU) and trishaw riders. The time has come for the payments under these i-Sejahtera schemes to be increased from the usual rate, such as the single mothers' payment of RM100.00 a year, which needs to be increased. We all understand the current increases and our own health, especially the people's representatives, are also feeling the strain due to the rising prices of goods now. This cannot be denied, and we hope that the State Government, which is well known as a government that cares for the people's welfare, will reconsider, among others, these i-Sejahtera schemes to be increased for the welfare of the people. Likewise, the contributions or allocations that are available under the people's representatives should be enhanced as suggested by Pulau Tikus, and by all of the people's representatives, for us to increase so that it is easy for us to provide welfare to the people. Members of the House, to conclude, today, which is the vision of the State Government, I call on the State Government to focus on the suggestions that have been made about the welfare of the people, about eco-tourism, about the problems of small traders, especially the traders who are the Chicken Slaughtering Association, who asked that the representative of Datok Keramat should give comments in the debate speech on what was requested by the Small Traders' Association, namely chicken slaughtering, so that the EXCO gives the best response in the speech later. So I call on the State Government to focus on those suggestions and to consider them carefully and give due consideration in line with the Penang2030 mission and the Safe Family Policy so that these can be achieved effectively and not merely placed on paper for presentation purposes only. Rain falls, a typhoon strikes, One step of the staircase breaks, Though we are all different, Living in harmony must be preserved.

Members of the House, I hereby respectfully move to support. Assalamualaikum Warahmatullahi Wabarakatuh.

Deputy Speaker of the HouseEN

Thank you, Pulau Betong. I ask the Honourable Members to follow the example of Pulau Betong with the right timing. Please proceed. I would like to remind all the Honourable Members that if they do not wish to debate, that is fine, I will go straight to the winding-up session. Please speed up the debate. Thank you.

Goh Choon AikPKR · PHBukit TambunEN

Good afternoon, Dato' Mr Speaker, the respected EXCO line-up, fellow comrades, and all heads of department. Warm greetings. First of all, I would like to express my gratitude to God because, by His abundant blessings, I am able to sit in this honourable House to debate the Supply Bill and Development Estimates Motion 2022. Based on the performance of the State Government's revenue for the years 2016 to 2020, tax revenue has been static, within the range of RM130 million to RM136 million. Therefore, the performance of the State Government's revenue depends on the performance of non-tax revenue and non-revenue receipts. The decline in both of these revenue components has caused the revenue obtained in 2020 to be only RM467.28 million, resulting in a deficit of RM117 million. After taking into account this deficit and the amendment of RM150 million to the Development Fund, the accumulated balance of the consolidated revenue account for the year ending 2020 is only RM880.78 million. Accordingly, the State Government needs to expedite the reclassification of rural land to urban land by changing rural areas that are rapidly developing or already on par with urban areas under Section 51(2)(a) of the National Land Code. At the same time, what is the State Government's status for amending the original urban boundary under Section 11(c)(a) of the National Land Code and establishing new towns under Section 11(d) of the National Land Code. The State Government is expected to generate tax revenue through the implementation of the programmes mentioned. This is to ensure that the contribution of non-tax revenue related to land matters to the State Government's revenue increases sustainably, PDC must complete the development of Batu Kawan Industrial Park 2 and Batu Kawan Timur as soon as possible. Both of these industrial parks, totalling 1,500 acres, will contribute premium proceeds from land sales for the grant of land ownership, premium for the grant of ownership rights and special charges for the grant of ownership to the State Government.

In line with that, PDC must produce efficient, innovative management leadership that is always ready to face current changes and challenges. The new leadership must also nurture work values and culture that are based on performance, quality and productivity. The failure of the Batu Kawan Bridge Project, the irregularities in the Tanjung Berembang Bridge Project and the defects in the Valdor Management Road must be taken as lessons.

Heng Lee LeeDAP · PHBerapitEN

Excuse me, Bukit Tambun. I was very interested in Bukit Tambun because it touches on the industrial park. This is indeed very important to the state of Penang in our economic development, but what I understand about Batu Kawan 2, that is Byram, right? Byram. It is only two kilometres from the waste disposal site at Pulau Burung, and I am puzzled, and because I am often asked by investors who know me, whether this will have a negative impact or effect on foreign investors who wish to invest in that place, and how we can solve this problem?

Goh Choon AikPKR · PHBukit TambunEN

Dato’ Deputy Speaker, I just want to answer the question that was raised by Berapit. Indeed, in my debate speech, we understand that I have a request where we need to rebrand the rubbish disposal site at Pulau Burung because we are worried that when investors come to make visits, the situation near the site is indeed worrying. As the representative of the area, so I would also like to ask MBSP to look again at the planning in future, if the master plan.....(with permission) submitted by PDC perhaps at the front of the road to the waste disposal site.

Deputy Speaker of the HouseEN

The Honourable Jawi has already informed about the proposal yesterday to green the area around Pulau Burung.

Goh Choon AikPKR · PHBukit TambunEN

Okay, thank you.

Heng Lee LeeDAP · PHBerapitEN

Give me a little opportunity.

Goh Choon AikPKR · PHBukit TambunEN

Thank you to Jawi and Berapit.

Heng Lee LeeDAP · PHBerapitEN

I want to give support to both of the Honourable Members, because that place is one of the only places that we now want to develop for an industrial park. So although I am not originally from SPS, I feel that this proposal should be studied very carefully and explained to all the people of Penang so that we have confidence in ourselves.

Deputy Speaker of the HouseEN

Thank you, Berapit.

Goh Choon AikPKR · PHBukit TambunEN

Thank you to Berapit. As is well known, I, as one of the Board Members of investPenang, from the very first day have conveyed what Berapit conveyed about the unsuitability of the Byram area for development as an industrial area for foreign direct investment .....(with permission) and that this area needs to be developed as general industry. Industry that is more suitable to the existing conditions. Therefore, I am one who has always championed the development of Batu Kawan Timur, and the issues highlighted by Jawi have indeed been noted in the investPenang meeting. Furthermore, over the past five years, the progress of infrastructure, especially roads and traffic management, has lagged far behind the rapid growth of industry. Especially in Batu Kawan and the surrounding areas. This has caused traffic congestion during peak hours on Jalan Bukit Tambun, Jalan Batu Kawan, Jalan Perusahaan Valdor and Jalan Persekutuan, and ADUN Perai, Dato' Deputy Speaker, ADUN Jawi, ADUN Sungai Acheh are among the ADUNs who are trapped in this traffic congestion every day. I agree with the proposal of Honourable Jawi to set up a special committee to address this issue. Apart from relying on proceeds from the sale of industrial land, it is time for the State Government to run a programme to extend the lease period of industrial land that will expire within the next 10 to 15 years. Especially in Bayan Lepas, Perai and Mak Mandin. Has a study begun to determine the amount of premium that can be charged for the new 60-year lease? The State Government certainly wants to retain industry here, with the hope that they will contribute, expand their operations and create more job opportunities. Meanwhile, the factories are thinking about the implications of this premium on their operating costs. With 52 years of experience in transforming the development of the State of Penang, PDC should rightly offer itself to rejuvenate the Mak Mandin industrial area together with MBSP. This rejuvenation programme may involve upgrading infrastructure and restructuring the types of industry to attract investment of higher value. As for the factories, they will benefit from the higher market value of the land. Besides that, PDC needs to make plans for the land it owns. What are PDC's plans for the land of approximately 100 acres near the Penang International Airport? What about plans for the hilly land in Bukit Jambul and also Paya Terubong, measuring approximately 616 acres?

Is PDC limited only to industrial development? Is PDC prepared to venture into fields such as agro-tourism involving the durian orchards mainly in these two areas? To reduce dependence on land revenue, the State Government needs to strengthen the returns and earnings from investments. The State Government can also use CMI and PDC to venture into various business fields that are able to bring in profits. Apart from measures to increase revenue, I support the State Government's action to control expenditure on emoluments, services and supplies, which increase every year, including controlling the creation of new posts. However, this year we have created the post of General Manager for Penang FC, and next year we will create the post of Chief Executive for the Penang Library Corporation, as well as what will be discussed in this State Assembly sitting, namely creating the post of General Manager for CMI. These are just a few examples that I am aware of of posts that have been created. Does the State Government intend to restructure the State GLCs and the subsidiaries under CMI? Mr Speaker, while the State Government controls the financing of projects or programmes by state departments, the cost of construction materials and transport costs have soared. How can the State Government address this challenge? For example, the tender for the Batu Kawan - Byram Bridge Project had to be recalled because the lowest tenderer was far higher than the estimated project cost. Among the construction materials whose prices have surged is ready mixed concrete .....(with permission). Based on my understanding, the rise in the price of this ready mixed concrete is due to four factors. First, the increase in cement prices. Second, the increase in quarry products such as sand and aggregate stone. Third, the increase in diesel prices. Fourth, the difficulty in obtaining workers, especially foreign workers. The supply of quarry products has faced problems after the closure of several quarries in the Central Seberang Perai area and the cessation of operations during the Movement Control Order (PKP). Now the quarries are concentrated only on Jalan Tasek Valdor, which is in the DUN Sungai Bakap area. One is in Bukit Tambun, and another is in Juru. The quarry in Juru does face the issue of a permanent forest reserve owned by the State Government. The quarry in Bukit Tambun is increasingly being encroached upon by housing and industry. Therefore, only the quarry on Jalan Tasek Valdor is still suitable and can be continued. This also causes problems for ADUN Sungai Bakap. Nevertheless, the quarries here face the problem of elevation exceeding 76 metres. Is the State Government prepared to allow existing quarries to operate in areas above 76 metres? This is for the existing quarries. If not, where is the new area that will be zoned as a quarry in Seberang Perai, according to the local plan that is in the process of being gazetted? Moving on from stones, I turn to the issue of chicken prices. The price of chicken and other food prices has now become a very big issue, especially for the common people. For the information of the House, the actual price of chicken: the cost per kilogram of chicken at the farm, according to the Veterinary Department at this time, is approximately RM5.50 per kilogram, and the farm selling price is RM6.30. The wholesale price is RM8.40, and the price of standard processed chicken sold retail is approximately between RM10 and RM10.50. From the prices I have just presented, we can see where the main problem lies regarding the increase in chicken prices. This is not only happening to chicken but also to other foods, including the price of palm cooking oil and the price of vegetables.

Although the price of chicken appears to have soared since September until now, do we realise that throughout this PKP, throughout these twenty months, the price of chicken has indeed fallen, the farm chicken price has indeed fallen below the cost price. Companies that rear or are involved in the poultry industry have suffered losses throughout the PKP. And many chicken farms have been closed or these companies have reduced their rearing, so that when the PKP ended and economic and social activities resumed, demand exceeded supply. Therefore, the Federal Government in this matter needs to examine why the cost of rearing has increased. Firstly, regarding chicken feed and fish feed, and livestock fish, most of these raw materials are imported. Soya and maize are all imported from Brazil, Argentina and the United States of America. When the Ringgit Malaysia weakens against foreign currencies, prices will soar. And at this time we are facing the problem of transport costs, namely freight. Transport costs have also increased manifold. And at the same time, livestock feed also uses CPO (crude palm oil). Before the pandemic the price was approximately 2,400 metric tonnes. Now it is 5,500. The raw materials for processing chicken feed, which involve local crops, namely oil palm, have also increased manifold. Therefore, for the State Government, we need to work together with the Federal Government to plan suitable areas for cultivation. Cultivation is not only for food, but also for livestock feed, and as I have often discussed, namely that livestock areas need to be preserved. We need to gazette in the Local Plan to ensure that there are no projects, especially housing, close to agricultural areas or livestock areas. Mr Speaker, here I will also raise issues in the area. Firstly, as mentioned earlier, traffic congestion. I hope ADUN Tanjong Bunga, through the JKR, will ensure that the section of Jalan Persekutuan after Phase 5 of the Upgrading Project be upgraded at least to the junction of Jalan Persekutuan and Jalan Perusahaan Valdor, that is the first. Secondly, the problem of defects on Jalan Perusahaan Valdor and the Batu Kawan Bridge by PDC, which has continued for one year, needs to be completed urgently. Thirdly, the connecting road of Jalan Tasek Mutiara 10, which should be connected to Jalan Hijauan 1, which was raised by ADUN Jawi yesterday. The road is only 380 metres long. I have been informed that the MMK meeting has already made a decision. Therefore, I hope MBSP will ensure that the developer involved connects the road to ensure that traffic dispersal in Bandar Tasek Mutiara can be resolved in the near future. Next, fourthly, regarding Stadium Batu Kawan. I extend my thousand thanks to ADUN Bagan Jermal for, through the Stadium and Playground Management Corporation, upgrading the track at the stadium. Here, I would like to seek clarification from the State Government and also from Honourable Bagan Jermal. The remaining stadium land is approximately 100 acres. What are the plans for it, and when can the projects related to this stadium be implemented in the near future? The issue, fifth, is about Jalan Paboi. Since 2018, I have raised questions with PDC about the land acquisition on Jalan Paboi, and until now there is still no further action, and at the same time the landowners cannot do anything because it has been brought under Section 4 of the Land Acquisition Act.

And next, sixth, the issue relating to DUN Sungai Bakap, namely the flooding issue at Sungai Kecil, in front of the Nibong Tebal Paper Mill, namely the bridge or box culvert crossing a river is quite low, in the area of the highway the waterway flows smoothly because the bridge on the highway is quite high, but when it reaches Jalan Sungai Kecil, the water cannot pass through and overflows along the road in front of the Nibong Tebal Paper Mill (Nibong Tebal Paper Mill). Seventh, regarding the flash floods that always occur in Kampung Sepulau and also Kampung Sethu, which have continued for decades. What action or plans will the Drainage and Irrigation Department or the MMK for Flood Mitigation take to overcome this problem? This also includes the junction of Jalan Changkat and Jalan Persekutuan, which constantly faces overflow from Sungai Jawi. And next, the issue of cage fish farming, especially in the Sungai Udang waters. Every time there is a storm, the cages suffer damage. Is the area, namely near the Second Bridge, still suitable to be used as a farming area, or does the Department of Fisheries have more advanced technology to ensure these fish cages are sturdy and able to withstand storms? And the cage fish farming area also faces the problem of disturbance or pollution, namely water pollution and disruption of the aquatic ecosystem, which causes a lack of oxygen in the water, and once the fish in the cages face a lack of oxygen, all the fish in those cages will die, and the losses amount to millions, and we are well aware that cage fish farming is one of the main sources of income in the fisheries sector in Penang and also among the largest farming areas in Malaysia. Therefore, it is the responsibility of the State Government, together with the farmers, to ensure that this industry can be developed and sustained in a sustainable manner.

Deputy Speaker of the HouseEN

Honourable Bukit Tambun, two (2) more minutes, unless there is an issue regarding Sungai Bakap.

Goh Choon AikPKR · PHBukit TambunEN

Okay. Regarding Sungai Bakap, indeed… Simpang Ampat in Sungai Bakap just now, apart from connecting Jalan Tasek Mutiara 10 to Jalan Hijauan 1, the main problem is also Jalan Tasek and also Jalan Valdor. The TIA study has been completed, and it is time for the State Government or the Federal Government, especially at the level of the Ministry of Works, to act. Based on the results of the TIA study, upgrading the length of 1 loop of that road to become the Jalan Tasek Valdor ring road is very important. Another point is the proposal for an industrial area in Sungai Bakap. Honourable Dato' Deputy Speaker has often voiced the problem of the movement of lorries carrying red soil and lorries carrying stone from Tasek Valdor to Byram to Batu Kawan. Is Sungai Bakap suitable for development as an industrial area? In fact, the Sungai Bakap area has a large oil palm plantation area, especially along the road in Penjara Pulau Pinang, that is…

<t n="220"> Penjara Sungai Duri.

Deputy Speaker of the House

Penjara Sungai Duri.

Goh Choon AikPKR · PHBukit TambunEN

Yes, in Sungai Duri. There is an area there of approximately 700 acres. That area may be suitable for development as an industrial area because it does not need to involve earthwork. When it does not involve earthwork, we reduce movement, the movement of lorries, and reduce congestion, while at the same time creating job opportunities for the residents nearby and also enabling industries based on livestock farming or agriculture to be carried out in that area. And finally, the issue of Dewan Dedaun in Bandar Cassia. Last month, MPKK received information that the hall had been proposed, and there was an application to change its use to academic zone. For the information of the State Government, Dewan Dedaun is the only public hall for the Bandar Cassia area. The hall was indeed left abandoned for a long time, but it was refurbished with an allocation from the ADUN for Bukit Tambun in 2019, and it was used for community activities before the PKP and is suitable to be used as a venue for badminton training or competitions. Bukit Tambun did not apply for RM700 million, RM7 million as Jawi did, to build a new hall or badminton court. The hall can accommodate three (3) courts with sufficient height, and it is adequate to be upgraded as the first badminton court in the DUN Bukit Tambun, and at the same time can be used as a hall for kenduri-kendara when permitted later. And as a Member of the MMK for Social Development, I am indeed impressed and also always support the programmes organised by PWDC. Over these three (3) years, over these two (2) years, PWDC, apart from PWDC itself and also through the programmes of JPWK, has launched and held various continuous programmes, including during the PKP, the programmes have never stopped. And regarding the new proposal for the Top-Up Women-Only Additional Seat, as a Member of the MMK for Social Development, I give my full support. However, filling this quota is not merely about filling it. We must ensure suitable candidates, candidates who are capable, candidates who are qualified to fill these positions. We must not simply do it to show that we want a 30% quota, and the candidates who will be filling these seats must bring an agenda about the voices of professional women, the voices of single mothers, the voices of related women, because at this time, why do women…

<t n="222"> Honourable Bukit Tambun, this one, if not in between, Bagan Dalam also cannot sleep. Give him one minute.

Deputy Speaker of the House

Yang Berhormat Bukit Tambun, boleh ini kalau tak celah tengah-tengah, Bagan Dalam pun tak boleh tidur. Bagi dia satu (1) minit.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you, Dato' Deputy Speaker, for the recommendation just now. Okay, I agree with Bukit Tambun. On the Top-Up Women-Only Additional Seat here, we all support it. And as I stated yesterday too, parties that do not nominate women should not be given the opportunity, that's one. Even though they have representation in this House. That's one, like PAS lah.

Deputy Speaker of the House

Repeated again. Yesterday already talk about that.

Satees A/L MuniandyDAP · PHBagan DalamEN

Different point. I also agree with the view of Bukit Tambun who said we should not use this TWOAS as if merely to fill up that 30 per cent quota. So, we need to ensure that those who are chosen are... because in my understanding, an ADUN elected through TWOAS cannot exceed one term, only one term, one session only they can become a TWOAS ADUN. So, we want those who are chosen to truly understand the function and what they are capable of, and most importantly they must be permanent residents and also residents of Penang. We do not want later, because of a shortage of candidates, to go and take from Selangor, go and take from Kedah, go and take from Negeri Sembilan, we don't want. State Legislative Assembly, ha, not now, he has already become a Penangite.

Deputy Speaker of the HouseEN

Honourable Bagan Dalam.

Satees A/L MuniandyDAP · PHBagan Dalam

Ini.

Deputy Speaker of the HouseEN

Still, you have repeated it once more. You said it yesterday too.

Satees A/L MuniandyDAP · PHBagan DalamEN

This one, I didn't say.

Deputy Speaker of the House

Harini pun you cakap.

Satees A/L MuniandyDAP · PHBagan DalamEN

No. No. No. Yesterday I didn't say this.

Deputy Speaker of the HouseEN

I still remember, yesterday you said this one.

Satees A/L MuniandyDAP · PHBagan DalamEN

No, I didn't say it.

Deputy Speaker of the HouseEN

Bukit Tambun is requested to continue.

Satees A/L MuniandyDAP · PHBagan Dalam

Tentang Pulau Pinang, tak cakap semalam. So, we want.

Deputy Speaker of the House

You sudah cakap semalam.

Satees A/L MuniandyDAP · PHBagan Dalam

Local Penang women to be presented.

Deputy Speaker of the House

You are repeating the same thing.

Satees A/L MuniandyDAP · PHBagan Dalam

That’s my, that’s my.

Deputy Speaker of the House

Please consult your doctor.

Satees A/L MuniandyDAP · PHBagan DalamEN

No. No. No. didn't. I didn't say this yesterday.

Chong EngDAP · PHPadang Lalang

Dato’ Speaker.

Deputy Speaker of the House

Please consult your doctor, I remember you say it yesterday.

Chong EngDAP · PHPadang LalangEN

I ask, I ask for just two minutes for this.

Deputy Speaker of the House

Bukit Tambun, your time is running.

Goh Choon AikPKR · PHBukit Tambun

Okay ah.

Deputy Speaker of the House

Okay.

Chong EngDAP · PHPadang LalangEN

It's okay, two minutes only. Firstly, surely all these top-out women have a certain mission, namely to bring the voice of women. Perhaps women not only in equal rights, women in the economy, women in politics, women in agriculture, women in health, the health sector. Various, and they must be Penangites, because the ADUN elected must also be permanent residents of Penang, right.

Deputy Speaker of the House

Betul.

Chong EngDAP · PHPadang LalangEN

Penang people. Yes, and to choose who it actually is depends on each party. Each party chooses. But we have one condition, which is that he must attend the gender course, the gender course, the PWDC gender awareness course. So, there must be gender awareness and gender lens, so that whatever issues they bring up, they will remember women and men, boys and girls. This is only for now. Okay, thank you.

Deputy Speaker of the HouseEN

The Honourable Padang Lalang, the proposal of Bagan Dalam is saying quantity is okay, but quality they want. Yes, okay. Bukit Tambun.

Goh Choon AikPKR · PHBukit Tambun

Okey.

Chong EngDAP · PHPadang LalangEN

Guarantee there is quality.

Goh Choon AikPKR · PHBukit TambunEN

Okay, I think. Thank you, thank you to Padang Lalang and also Bagan Dalam.

Deputy Speaker of the HouseEN

Bukit Tambun, one more minute.

Goh Choon AikPKR · PHBukit Tambun

Okay.

Deputy Speaker of the HouseEN

You have already exceeded 10 minutes already.

Goh Choon AikPKR · PHBukit TambunEN

Okay. On this matter, returning to the Supply Bill and Development Estimates Motion 2022, I indeed invite my fellow comrades to be the backbone of the Most Honourable Padang Kota and also the respected EXCO team, so that together we seek state government revenue. We all indeed want more allocations and more expenditure to benefit the ordinary people in their respective areas. However, the State Government's revenue so far is limited. Therefore, we need, we need to ensure state revenue increases, especially in terms of tax revenue, even though this may burden some people, but we need, we need to implement, for me, the Penang Land Rule. The time has come for us to implement it, especially for areas where villages have become towns, which should be subject to appropriate taxes. That is very important because our land tax is only paid once a year. These matters may be manipulated and turned into attacks by politicians. I hope the Leader of the Opposition will not oppose such matters. That is because we charge land tax based on valuation. And this valuation is carried out by the Property Valuation Department at the Federal level.

Deputy Speaker of the HouseEN

Bukit Tambun. One minute more.

Goh Choon AikPKR · PHBukit TambunEN

Okay. One minute more, ha. Thank you to Dato' Speaker. That is all, and before I withdraw, I also wish to extend best wishes for continued success to Dato' SUK, Dato' Seri State Secretary, who will serve at the Ministry of Higher Education, and especially during the pandemic, he steered the State Government machinery to visit, to fight COVID-19, especially in terms of CITF, preparing vaccination programmes, assisting the State Government, assisting the Health EXCO to ensure that the, the vaccination process could proceed very smoothly. With those words, here I support the presentation of the Supply Bill and Development Estimates Motion 2022 by the Most Honourable Padang Kota. That is all, thank you.

Deputy Speaker of the HouseEN

Thank you, Bukit Tambun. Machang Bubuk, please.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Dato' Yang di-Pertua. Greetings of peace and greetings of hope. Thank you to Dato’, for giving me the opportunity to take part in the 2022 Budget Debate. The 2022 Budget presented by the Chief Minister is extremely important for the State of Penang, especially for the people who need to rise again from the very severe impact of the COVID-19 pandemic. We will not forget the COVID-19 pandemic. But what we need to remember is what we learned from this pandemic. Although, now we see this pandemic seems to have reached its end, with high vaccination rates, and even Malaysians have been given the opportunity for booster doses. However, the difference between a well-planned course and a chaotic course will be measured by how many lives are lost. Decisions made by the government can affect whether a person lives or dies. We seem to have reached the end of the pandemic. This is also a final opportunity for the government to show what the government has learned from the mistakes they made at the beginning. As we look ahead, what we must anticipate for the health and daily lives of all of us. Although the future is uncertain, if the government cannot rethink how we arrived at today's situation, or what we can avoid, then it will become a catastrophe and a failure for the government and all the Members of Parliament who have been entrusted and trusted by the people. So, Dato' Yang di-Pertua, is our government learning to take action swiftly and effectively. The hope that vaccines will eliminate COVID-19 is naive, and also impossible to achieve. What is even worse now is that the virus has evolved, yes, with various variants, yes, from Alpha, Beta, Delta, and recently we were also shocked by a new variant originating from South Africa, namely Omicron, which is a vaccine-resistant variant.

Yes, so how quickly can we enter the endemic stage, yes. Many of us talk about endemic, but have we reached endemic. With Penang entering Phase 4, the National Recovery Stage, as well as the reopening of the national borders which will take place next year, we will receive many visitors and foreign tourists next year. No one knows what will happen after this. Yes, we have no solid evidence that we will become immune and the virus will disappear in the future. To reduce the chance of this virus mutating or evolving in a more problematic direction, the only thing we need to do is ensure the infection rate declines, not only in our country but across the whole world. Yes, given that we can no longer afford to carry out lockdowns. Yes, forever, because it is not a reasonable option. So I have a proposal for the State Government, where there is a relatively cheaper method, namely the Surveillance Strategy, which is conducting testing of our sewage system. That is monitoring the levels of sequency, sequencing the genome of the virus in the municipal wastewater to get the rate of infection and detect or track the new variant. This is a cheaper way for us to identify whether our sewage system contains viruses with this new variant. Yes, we need to strengthen capacity and resilience for our future pandemics. Dato' Yang di-Pertua. We understand that it is very dangerous for all of us if our society is not prepared and resilient to face pandemics in the future. Yes, so are we future ready? Yes, and can we face such extremely difficult challenges. Yes, there is too much that we need to do. I propose that the State Government should draft a road map to prepare for the various extremely critical challenges, before we reopen to tourists and residents across the world who will come to Penang. And I also wish to extend congratulations and well done to the State Government of Penang for successfully obtaining an allocation of US Dollar 10 million from the Climate Adaptation Fund for the MBPP (Penang Island City Council), JPS (Department of Irrigation and Drainage) and Think City to implement climate adaptation projects based on nature-based solutions. My question is why only MBPP received this allocation? Yes, why was MBSP, Seberang Perai City Council, not included in the projects subject to the US Dollar 10 million Climate Adaptation Fund? I request that the State Government also provide an explanation as to why MBSP was not included in this matter. Next, I also feel that the time has come for the government to focus on R&D as well. R&D is very important for developing technology that can shape ways of living, not just now but for the next 10 years. The government needs to develop and prepare its organisations to move towards Penang2030. Although we must go through the disruption of election cycles, yes. But we still need to plan for Penang2030. The government needs to have a clear direction and with priorities, a nation with clear targets. Yes, we need to learn from this pandemic, where human capacity to produce vaccines in such a short period of time is compared with the past. Yes, this also shows that cooperation between government and the private sector, public private partnership, can help us face the challenges in 2022.

Satees A/L MuniandyDAP · PHBagan DalamEN

Excuse me, make way for Machang Bubuk.

Lee Khai LoonPKR · PHMachang Bubuk

Okey.

Satees A/L MuniandyDAP · PHBagan DalamEN

Regarding Seberang Perai just now.

Lee Khai LoonPKR · PHMachang Bubuk

Okey.

Satees A/L MuniandyDAP · PHBagan DalamEN

Climax funding received from the UN (PBB) or United Nations that day, I also heard, is more specific to the island portion only. Whereas Seberang Perai, or the Seberang Perai City Council (MBSP), has had the aspiration to become a Low Carbon City, in fact efforts towards greenery or sustainability began in Seberang Perai when all of us became Councillors, including Dato' Deputy Speaker. So, Seberang Perai is, I think, Seberang Perai is the first city or municipality in Malaysia to join the International Council of Local and Environment Initiatives. At that time Dato' Maimunah was the Mayor (YDP), first. After that, we in Seberang Perai held the Seberang Perai SPICEC (Seberang Perai International Conference on Ecotourism and Conservation), so I think Seberang Perai is indeed on the right direction, and we feel Seberang Perai should also get a share if it is specific to the island portion. Maybe in future the State Government can get grants from other agencies for Seberang Perai as well, because greenery aspects or green initiatives are indeed one of the agendas of Seberang Perai itself. Thank you, Machang Bubok.

Lee Khai LoonPKR · PHMachang BubukEN

Yes, thank you, Bagan Dalam. That is a very insightful view, and I truly hope that what the MBPP State Government has done under the adaptation climax fund can serve as an example for other relevant departments too, where we can try to obtain more results for the state so that there are more projects while we wait for the Federal Government to allocate funds. This is an alternative approach that we can pursue. Yes, congratulations, congratulations once again that we received US Dollar 10 million, although it is not that much, it gives motivation and encouragement to all of us. Dato' Yang di-Pertua, the next thing I also want to touch on is the issue of accelerating in the digital world. I welcome the efforts of the State Government, especially in the Chief Minister's budget speech, which will establish Penang2030 centres in every KADUN. I suggest that the Penang2030 centre could start from the State Assemblymen's Service Centres, where these service centres are always in contact with local residents, and are also a destination for the public to seek assistance, to seek advice or contributions from the State Government and/or welfare agencies, yes, so that they can direct their complaints too. So these Assemblymen's Service Centres could be transformed into a Digital Integrated Services Centre, which was mentioned by Digital Penang, yes, which has stated how they want to integrate all the services provided by the State Government to the residents. Yes, they can come to the Assemblymen's Service Centre like a one-stop centre. Yes, if they have any problems, all of that can be handled using digitalisation so that their issues can be resolved. Thus, the digital role of Penang needs to be strengthened by providing an IT system that can improve the quality of service of the people's representatives to the residents. Yes, besides that, I feel the Penang2030 centre can also be equipped with a first support point, a first support point initiated by YB. EXCO Padang Lalang, yes, which was set up by PWDC, yes, in every KADUN under this Safe Family policy so that the issue of domestic violence can be handled better and also more professionally. So I feel the Penang2030 centre can play an important role, yes, that can become a destination close to the people, and the people will feel very comfortable; if they have any problems and come to the Penang2030 centre, their problems will be heard or handled well, yes. So, and we can also add to the Penang2030 centre, we can also place the SME Market Advisory Resources and Learning Smart Centre. A Smart Centre that functions, yes, as an Advisory Service Centre on the information and knowledge needed to start a business, can also be established in every KADUN so that young people who wish to find opportunities to set up their businesses can go to our service centre. Dato' Yang di-Pertua, the next issue concerns the infrastructure in Machang Bubuk. I would also like to take this opportunity to thank the State Government because the Alma retention pond, which is so important for tackling the flood problem in the Taman Impian and Taman Sukun Markisa areas, will be completed next year. This is one of the projects that has been eagerly awaited. Yes, furthermore, we also received news, it was informed that the procurement of consultants for the Rumah Pam Junjung Mati is also being carried out and it is expected that the appointment will be made, yes, the appointment of consultants will be made in December 2021, next month. Yes, this is good news for the people of Machang Bubuk, yes, because this will also at the same time address the flood problem that has often occurred in the Machang Bubok areas. Yes, so I would also like to take this opportunity to thank especially the State Government and also the Drainage and Irrigation Department (JPS), which has always been looking for solutions to reduce the flood risk in the Machang Bubuk area. And I also want to say, thank you to the State Government for deciding to upgrade Jalan Bukit Minyak up to Alma phase 2, which is not yet completed, and I understand that RM3.8 million has been allocated to complete the project, and next, regarding the Taman Eco Rimba Bukit Mertajam, which is at Cherok Tokun, at Cherok Tokun. This issue has also often been raised in the State Assembly sitting and also in my written question No. (9) nine, yes, we have already obtained, we have already obtained approval for the Slope Repair project under the RMKe-12 with an overall ceiling of RM15 million. We want to say thank you to the Federal Government, but in 2021 they only approved RM1.5 million. Yes, for the initial works, yes, but we hope that next year, 2022, the Federal Government will approve the remaining amount so that the damage to slopes along the road from the foot of the hill to the top, there are 66 spots that have experienced this, landslides. Yes, so urgent action is needed.

Yes, so I would also like to suggest to the State Government that they put every main infrastructure project onto a public dashboard, yes, a public dashboard, meaning all the projects can be placed online and everyone can follow and also monitor the progress of these projects online. Yes, this public dashboard will ensure the implementation of projects and that contractors will be accountable to the public, yes, and also ensure that the projects carried out follow the schedule that has been set and the budget that has been allocated. Yes, so every member of the public, those who are concerned about the progress of the project, can go online to check, for example, Tokun, yes, Taman Eco Hutan Eco Rimba Bukit Mertajam, we have RM15 million from the Federation, we place it there, estimate when the money will come in, when the work will be, when it will start, we can put all that information online so that interested members of the public, concerned citizens, can go and check and can become the eyes and ears of the government to ensure that these projects are carried out properly, and also ensure that the tax payer money, the money of taxpayers, is used prudently, yes, and involve the public in the process of monitoring the project's implementation. Dato' Yang di-Pertua, the next thing is about digital democracy. Crowdsourcing is a new instrument for us to make policy making, yes, in order to restore the legitimacy of representative democracy as well as public confidence in our democratic system, there is a need for the government to practise transparency towards open government that practises openness and transformation. For example, in Taiwan, anyone can file a petition regardless of their political party background, yes, every two (2) months, for any petition they wish to file with the government, if they have obtained 5,000 signatures, then the Taiwanese government will hold a collaborative meeting with the relevant ministries to study and also champion the proposals that have been suggested by the public, yes, in that way, young people who are not yet eligible to vote can also take part in the process. Yes, this is one of the ways we can produce or motivate the public to produce innovative policies. Dato' Yang di-Pertua, this is the end, searching for hope, yes. This is not the time to feel hopeless. It's a time for us to stand up and make a differences....(with permission). In times of crisis, people need to tell stories that can touch on their feelings and also their hardships, yes. We need to voice their feelings by telling what hardships they have gone through. I think everyone can make this world better, faster, more, more kind, yes, we can do it. This with better this. Now is the critical moment for us, not just for our planet but also for our leaders. The desire to act to restore people's confidence in governance and democratic government needs to be enhanced. The threat of disasters and pandemics will always exist, but the test is whether we are always prepared and also responsive. Only with confidence and cooperation among all of us, regardless of race, religion and political ideology, can we open a new and better curtain. The Penang State Budget may be the last budget before the State Assembly is dissolved next year. I don't know, perhaps the beloved Honourable Chief Minister can tell. The 2022 budget is also the largest deficit budget in history, amounting to RM 449.8 million. So we must make our spending work, yes, social spending must work, yes, the budget must not only be implemented with full responsibility and prudence to ensure that every ringgit allocated achieves its targets and benefits the marhaen people. Before I end my debate, allow me to take this opportunity to record my condolences to all the family members of the victims, especially the frontliners who passed away due to the COVID-19 pandemic. I asked a question in my written question, yes, I asked that the State Government provide a list of names of victims who have passed away due to this COVID-19 pandemic, especially for frontliners and also government staff who have passed away due to this pandemic, yes. But the list could not be provided, perhaps due to the sensitivity of the families or whatever. But I want to suggest here that the government can build a memorial park for all the COVID-19 victims so that we all, and future generations, will remember this pandemic which has taken so many lives, and also remind all of us about our preparedness to face future pandemics. So I would also like to take this opportunity to thank all the frontliners who have worked tirelessly without regard to exhaustion, and not forgetting all the staff of the Federal and State Governments who have served the people, especially in implementing people-centred projects in the Machang Bubuk area. Hereby I request to support.

Deputy Speaker of the HouseEN

Thank you, Machang Bubuk. The floor goes to Kebun Bunga.

Ong Khan LeePKR · PHKebun BungaEN

Thank you, Deputy Speaker. Peace and respect to the Yang di-Pertua, the Deputy Speaker of the House, and also all Honourable Members. I am also very happy because I still have the opportunity to take part in the debate on the Penang State 2022 Budget. Honourable Yang di-Pertua Dato' Speaker, since I was only given 20 minutes for this debate session, I request to support this 2022 Budget straight away. These are just some brief summaries and comments, I'll support it first.

Deputy Speaker of the State Legislative AssemblyEN

I'll add 5 minutes for you.

Ong Khan LeePKR · PHKebun BungaEN

Thank you, Deputy Speaker.

Deputy Speaker of the HouseEN

You were already crying from the start.

Ong Khan LeePKR · PHKebun BungaEN

Thank you very much, this is truly an extraordinary situation. Honourable Deputy Speaker, our country is still being hit by the COVID-19 pandemic, where the infection rate is still considered high, even though the National COVID-19 Vaccination and Immunisation programme implemented in the state of Penang has reached one hundred per cent for adults who have received two doses. With variants such as Delta, Lambda and recently the emergence of a new variant known as Omicron. The Penang State Government needs to be more vigilant in taking more comprehensive action to ensure the third wave of COVID-19 does not occur. For this purpose, I would like to suggest that scheduled sanitisation be carried out compulsorily in all agencies, government departments and public places such as stations, bus terminals, railways, ferries and airports. It is clear that vaccination is not a quick solution to COVID-19. Therefore, awareness campaigns and health knowledge on strengthening the body's resistance (with permission)....immune system for every individual must be expanded. Besides that, I suggest that quality vitamins and supplements be provided to all frontliners. I also find that some food stalls are still uncomfortable with the relaxation given by the Central Government to operate dine-in (with permission)...Mr Speaker, at shop premises. This is an indication showing the maturity of the people of Penang in tackling this COVID-19 war. However, Dato' Yang di-Pertua Speaker, the cases that remain high have raised the question of whether we know the cause of these cases and whether we can take steps within our means to prevent this virus from continuing to spread. In the meantime, I suggest that all, all foreign workers must be vaccinated, including undocumented foreign workers, as soon as possible. Dato' Deputy Speaker, now I want to move on to the topic of internet infrastructure development and cashless payment services (with permission)...cashless payment. According to a McKinsey & Company report, COVID-19 has accelerated the digitalisation process of businesses by at least three to four years ahead. Meetings and programmes are now also often held online via the Zoom application. Internet access has already become a necessity and is no longer just a want. The broadband penetration rate is now also considered a key economic indicator. As the next step to stimulate the economy in Penang, and also to ensure the existence of broadband and wifi coverage, I agree with the Penang State Government's direction to focus on developing internet infrastructure and achieving high internet connectivity in this state. With stable and fast internet access, the use of cashless payment services can be further expanded, as has been successfully implemented by the Penang Government, which now involves almost all government departments and agencies. I myself have many times (with permission)...I have so many times in fact through cashless platform making payments at various government agencies and departments electronically. For example at JPJ (Road Transport Department) and also the National Registration Department. I have also made payments cashless before. For example, traders who previously did not accept e-Wallet, FAVE or digital payments can be encouraged to do so if internet access and devices are provided, especially in public places such as markets and at morning and night market sites.

The Berita Harian report in July 2021 told the story of a rural student in Pulau Aman, Batu Kawan who had to go to the end of the island to get internet access. In fact, this problem could be resolved if telecommunications companies were directed to improve internet services in that area. Honourable Deputy Speaker, now I want to touch somewhat on the Kulim Airport. According to the national plan that is systematic, orderly and equitable, it is not economical and practical to build two international airports between two distances that are too close, namely approximately 30 kilometres from each other. Considering that Kedah State already has one airport in Alor Setar. The Kulim Airport that will be built in Kulim, Kedah will certainly compete with the Penang International Airport with a distance that is too close to each other. Such a situation is not only not conducive but also cannot optimise (with permission)...optimise national resources effectively and strategically. Dato' Yang di-Pertua Speaker..(interruption).

Lee Chun KitDAP · PHPulau TikusEN

May I have the floor for a moment?

Ong Khan LeePKR · PHKebun Bunga

Boleh.

Lee Chun KitDAP · PHPulau TikusEN

I am interested in what was raised by the Honourable Kebun Bunga just now regarding the airport that has been planned or is still in the discussion phase for Kulim. I think we, I mean if they want to build an airport, is the demand there or is the demand in Penang State? If they deliberately want to build an airport near Kulim? Is this a case of cutting up your nose to spite your face kind of issue? You know if the Federal Government really wants to develop the Northern Peninsula region, concentrate on Penang. Does the Honourable Kebun Bunga agree?

Ong Khan LeePKR · PHKebun BungaEN

Thank you, my friend from Pulau Tikus. For this purpose, the purpose of building an airport in Kedah, we know that many matters have been discussed and much debate has taken place. For this I have a proposal, to make a developed nation, Central Government policy must develop in line with trends and always move forward in ensuring that all states in Malaysia have their own industrial strength and stand shoulder to shoulder with the other states. In fact, Kedah, Penang and Perak can be integrated as one "Golden Triangle" with economic connectivity (with permission)...that is integrated. For example, in a developed country that has just gained the number one position in the world, such as China, the financial hub (with permission)...financial hub, trade, stock exchange, and exhibitions are located in Guangdong, Hong Kong and Macau, known as the greater bay area (with permission), whereas technology, logistics and financial services are centred in Shenzhen. Meanwhile, the IT (information technology) industry and the heavy machinery industry, which are rapidly developing, are located in Hangzhou Bay, Zhejiang.

In such synergy, following the greater bay area module, all the regions or all the states involved can develop and progress together.

In this situation, the people and the Government of all the regions or states involved will reap benefits. This means we do not need competition with other states; instead we can (with permission)... complement one another and progress together for the welfare and prosperity of the people and the nation. However, if the construction of Kulim Airport cannot be avoided, the Penang State Government must find a way to overcome the problem of the impending loss of investors to Penang. As a result of a chain reaction (with permission)...chain reaction, the loss of investment will contribute to the loss of investment and job opportunities, which will also affect our productivity. In such a situation, the government must find ways to strengthen and upgrade the existing industries in Penang, especially in the electrical and engineering field involving OSAT, or better known as Outsource Semiconductor Assembly And Test, ATE (automated test equipment), wafer manufacturing and so on. The PSDC (Penang Skills Development Center) needs to be upgraded to a university or institution of higher learning that is able to grant degree recognition to its students in line with the needs of IR 4.0. In short, the existing E&E industry in Penang must be given due emphasis to (with permission)...move up the value chain quickly so that we do not fall behind the current of IR 4.0, 5G and the strengthening use of EVs (electric vehicles), where we must also be able to attract investment and reinvestment (with permission)...reinvestment, whether from foreign companies or local companies, for R&D covering (with permission)...integrated circuit designing, manufacturing of microchips, microprocessors, motherboards, circuit boards or NAND, storage and flash memory, and other products that can generate higher-value income. Apart from an efficient human resource, we should also lead our neighbouring countries, as was suggested just now, in terms of fibre optic infrastructure and internet speed. This is among the best ways to encourage investment, trade, services including tourism, and thus economic development. Deputy Speaker, to achieve the Penang2030 Vision, I believe we should also target that urban poverty reaches zero by 2030. Here I would like to propose that the allocation for the Department of Social Welfare (JKM) be increased to RM30 million so that every poor family can be assisted more effectively and quickly. Besides that, with the rapid development in Penang, we must also remember the supply of food, where our agricultural sector must also be preserved and developed prudently. On this occasion I propose that the allocation for the Department of Agriculture be increased to RM20 million so that the promotion of (with permission)...Smart Urban Farming using the (AI) Artificial Intelligence method can be expanded to urban areas as well as rural areas. Dato' Deputy Speaker, I would also like to congratulate the visionary and caring Penang State Government, which together with MBPP and the Malaysian Architects Association (PAM) has succeeded in organising an international competition themed (with permission)...Rifle Range Penang Malaysia Urban Renewal Design Ideas Competition 2010 in 2010, when I was elected as the State Assemblyman for Kebun Bunga in the first term. This is an international competition that was held for the first time in Malaysia, Penang leads.

Recently we also received good news that Honourable Jagdeep Singh Deo A/L Karpal Singh, EXCO Perumahan (Housing EXCO), announced that the commitment of the Penang State Government, through the Urban Regeneration Committee (URC), will implement Urban Regeneration for the Padang Tembak flats, where a size of 800 square feet per unit can become a reality if the Federal Government, through the newly appointed Minister of Housing, also extends assistance in supporting this initiative. And one more point, Dato' Deputy Speaker: earlier I met the General Manager of CMI regarding Smart Urban Farming in the Kebun Bunga area. In a prime location there is a piece of government land of approximately 4 acres that can be made a suitable site for Smart Urban Farming, and I hope the Penang State Government will give support to this initiative for the cultivation of crops such as vanilla as well as high-value fruits. Finally, Dato' Deputy Speaker, I would also like to offer congratulations and kudos to the visionary and courageous Penang State Government for allocating approximately RM317 million for development, which will certainly help revive our economy that has been badly affected by the COVID-19 pandemic. Thank you, Dato' Deputy Speaker, and once again I respectfully request to support the motion.

Deputy Speaker of the HouseEN

YB. Kebun Bunga, you still have eight (8) minutes left.

Jason Ong Khan LeePKR · PHKebun BungaEN

Oh, thank you, but it's alright, I can give way to my friend from Seberang Jaya who is already impatient to stand up, lah.

Deputy Speaker of the HouseEN

So, Seberang Jaya, please.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Deputy Speaker, for allowing me a little time to take part in the debate on the Supply Bill 2022, which was tabled by the Honourable Chief Minister. I will begin my debate this afternoon with several pantun:

Picking palas at the edge of the swamp, A hand in pain, yet no medicine brought, COVID-19 is truly dangerous, An infectious disease that takes lives.

COVID-19 is not a joke, It brings death to the poor and the rich alike, Do not forget to wash and rinse, So that you are not caught by a dangerous disease.

Basil bushes are planted in abundance, Their shoots are plucked in great numbers, Thank you to the frontliners, Sweat dripping to defeat COVID-19.

Honourable Deputy Speaker, I want to draw the attention of the House to an issue we have faced for more than a year and nearly two (2) years, namely COVID-19, and Penang is no exception to facing this situation. I wish to record my highest appreciation to the Honourable Bukit Mertajam for kindly inviting me to join the COVID-19 Secretariat of the State Government of Penang, which also involves State Assemblymen from the opposition, to contribute ideas and thoughts to help the State Government's efforts to resolve and overcome the COVID-19 problem in the State of Penang. At the same time, I also acknowledge several initiatives taken by the State Government of Penang, especially in overcoming this COVID-19 problem, including with the assistance provided by the Federal Government. I am pleased to inform the House that, as a result of the efforts of the Federal Government under the Perikatan Nasional Government led by Tan Sri Muhyiddin at that time, which took the initiative to purchase vaccines early by signing the COVAC agreement and ensuring that vaccine supplies could be brought into the country, this was in fact the key measure that succeeded in bringing us out of the COVID-19 crisis that occurred recently. Like it or not, we have to accept the fact that the State Government and the Federal Government at that time had announced that by October 2021 the number of cases would fall because of herd immunity, and herd immunity had been achieved, namely more than 80 per cent of the adult population of the country had been vaccinated, and this had been achieved in Penang as reported by the State Government. I also wish to thank the State Government agencies, especially the Health Department and the District Health Office, which also helped my efforts to mobilise vaccination efforts in the Seberang Jaya and Permatang Pauh areas and also in the Seberang Perai Tengah District, where two (2) vaccination centres are located within my own constituency, namely at the SP Arena Hall and the Seberang Jaya Expo Site Hall. I extend special thanks to PDC for resolving the air-conditioning problem that occurred at the SP Arena Hall, which ultimately provided comfort not only to our frontliners but also to those receiving vaccines at the SP Arena Hall, and now the Seberang Jaya Expo Site Hall is being used as a hall for administering the third booster to the public. I want to draw attention to the fact that I had raised before with the State Government the matter of the COVID-19 Fund. We have more than RM4 million that has not yet been spent, and these contributions came from individuals, the private sector, State Government agencies and various other parties who have contributed to the COVID-19 Fund of the State of Penang.

This also applies to the ADUNs. I suggest to the Honourable Chief Minister and the State Government that the remaining allocation may be spent promptly before the end of this year by involving all ADUNs in programmes and specific plans that can help and be more targeted at those who need it in the State of Penang. I also wish to draw the attention of the ADUNs and the State Government to the implementation of all the People's Aid Packages 1.0, 2.0 and 3.0 provided by the State Government of Penang. Why I want to raise this matter: I accept that a very large allocation has indeed been provided, but there are still aids, if we go by the written reply given, which show that the actual expenditure does not reflect the allocation provided. Among them is the Special Financial Assistance of RM500 one-off to hawkers and stallholders who trade in food complexes, namely private shops, for phase 2, out of 1,670 hawkers and stallholders, for which the allocation provided was RM1.5 million, but only RM835,000 has been spent. I am not sure whether all these hawkers have received it or whether there are hawkers who have not yet received it? So I hope the State Government can look into this, and also as an example of the Special Financial Assistance of RM500 one-off to hawkers and stallholders who have tagging and are registered with the PBT. For this one too, an allocation of RM2.83 million was provided, but only RM793,000 has been spent to date. I also wish to draw the attention of the Honourable EXCO for Tourism to the Penang Business Continuity Interest-Free Loan, or the Pinang Business Continuity Zero Interest Loan, for which an estimated allocation of RM10 million was provided, but only RM3.245 million has been disbursed. Perhaps these traders do not want loans; they want grants or aid such as that provided by the Federal Government to help them face a time when tourism economic activity has still not picked up fully and has still not reached its optimum level, because our borders are only just beginning to open, and even after they opened, people are still hesitating and calculating whether or not to travel. That is why, out of all these phases that have been provided, I wish to suggest to the State Government that a special secretariat or committee be established, involving all parties, whether from the government or the opposition, to monitor all forms of expenditure and also to see for ourselves how these aids are delivered, because I feel this is necessary in the current situation, where we can no longer rely only on our old ways of working. This is the age of data and science, where data can show whether our aid truly reaches its target or not, and this is important for Penang because I see Penang as a state that is not very large; by the latest statistics its population is only 1.7 million people, which we can manage, and at the State Government level, in terms of delivery of governance, this can be improved if a secretariat like this is established. This has been done by the Federal Government with the establishment of agencies such as LAKSANA, which monitor all the recovery and economic stimulus plans made by the Perikatan Nasional Government at the Federal level, where they have implemented auditing and provided regular reports every month on the performance of all aid programmes provided by the government. I think this is important, because I appreciate the State Government's efforts to provide aid, but at the same time we must ensure that our aid truly achieves its purpose and targets those who need it.

At the same time, I also wish to draw the attention of the State Government and all Members of this House. I had put a question to the Honourable Jagdeep Singh, the Honourable Member for Datok Keramat, on the issue of small traders affected by COVID-19. Unfortunately, the reply I received was, I think, rather unsatisfactory, because I had asked for the number of traders affected to the point of having to close their businesses, especially in Seberang Perai Tengah. So far, MBSP has not received any application for licence cancellation citing closure of business as the reason for cancelling the licence of a trader in the Seberang Perai Tengah area. I feel this answer is not logical. Surely a person who has closed down would not go and report to MBSP, "I am bankrupt, I want to cancel my licence." I feel this is not a way for us to look at data. I am confident that many traders have been affected, many traders have closed down, but if this is the answer from the Local Authority, then what does this really reflect about our efforts to help them? That is why it is not impossible that the allocation provided earlier was not fully spent, because our data is not accurate; our officers see that no one has come to report a closure, so no one has gone bankrupt. I understand that perhaps many people are working from home, but we must not reach the point where we do not see the real situation, the real plight of traders who faced problems during COVID-19. So I ask that perhaps the Honourable Datok Keramat may refer back to the Council to obtain detailed data. Who has truly been affected and closed down, because I know that at my Service Centre there are traders who come every day to complain and tell us of their problems: no working capital, unable to trade because of the movement control order, unable to carry out their activities. So it is impossible to say that nobody at all has closed down. So I hope the Honourable Datok Keramat can give me some clarification on this matter, so that we can together look at and solve the problems of our traders who have only just begun to recover from COVID-19. In the meantime, I wish to draw the attention of the House to the Budget of the State Government of Penang tabled by the Honourable Chief Minister. Earlier, the Honourable Machang Bubuk said that perhaps this is the last Budget before the election. If I look at this Budget, it seems not ready for an election, because I do not see a clear focus, I do not see any major announcement that can truly stimulate the economy of Penang again. But what troubles me more is what was tabled by the Honourable Chief Minister regarding the projected state revenue, which shows operating expenditure and the budget deficit to be announced for 2022, where projected state revenue totals RM485.42 million, with operating expenditure totalling RM935.22 million, so the budget deficit is expected to be RM449.8 million. I accept that, in a situation where we face a pandemic and the people need assistance, the government has to spend more, but the point of my dispute here is that this is the second year in a row that the State Government wants to use the state's accumulated savings or state reserves to finance the deficit that will be recorded at the end of the State Government's expenditure year, where currently the balance of the state's accumulated savings is only RM887.78 million as at the end of 2020.

If my State Government were to take an average of RM400 million deficit every year, then we would only have two (2) years left of our reserves. What will happen to our State reserves, whereas the State Government should adopt a new strategy and think of new measures, using all the State GLCs to add state assets and also add state revenue. Not using state reserves, which previously were worth more than RM1 billion. This is the second year in a row... (with permission) Mr Speaker, the State Government is using the state's accumulated savings to manage the State Government.

Satees A/L MuniandyDAP · PHBagan Dalam

Minta laluan..

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Wait a moment, I will give way after this. That is why I want to suggest to the Honourable Chief Minister that I see our GLC agencies, both PDC and PBA and many others including the Council, and we need to look again at the expenditure where the State Government provides special grants to them, including to PDC, which, as the development arm of the State Government, should look for new strategies to expand state income and not rely only on subsidies or bailouts from the State Government, because if this continues to happen, I am afraid that when we take over the Government, there will be no money left in the reserves of this State Government.

Lee Chun KitDAP · PHPulau Tikus

Minta celah

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Bagan Dalam first.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you, Dato' Deputy Speaker, thank you, Honourable Seberang Jaya, for giving way. Seberang Jaya said that we need not touch the state reserves, but in the current pandemic situation, an economic downturn in which state government revenue has also decreased, we cannot take hasty action to go after those businesses in Penang... (with permission) because this will have a long-term impact on the State of Penang. But I want to ask for Seberang Jaya's view. One of the reasons why we do not have enough money, or why our finances are weak, and why we have to touch our reserves, is that the Federal Government under Perikatan Nasional, and Barisan Nasional, have never treated us fairly.

This morning the Honourable Chief Minister said that, according to the GDP that we contribute to the Federal Government, we should have received RM5 billion from the Federal Government as an annual grant, but what we got was less than RM1 billion, only RM960 million. So I ask the Honourable Seberang Jaya to convey our voice to the party or to the leaders at the Federal level, to treat Penang fairly. Give us what we deserve, then we don't have to touch the reserve... (with permission)

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Bagan Dalam, I do not agree with the Honourable Member... (interruption).

Lee Chun KitDAP · PHPulau TikusEN

Give way a little first.

Deputy Speaker of the House

Pulau Tikus.

Lee Chun KitDAP · PHPulau TikusEN

Let me speak first, okay. Thank you, Honourable Seberang Jaya. Earlier, I was very interested in what the Honourable Seberang Jaya said, that this is not a budget for the election. But I feel that now the most important thing is that the budget is to sustain what we have here, and not only that, because as the Honourable Seberang Jaya made an admission that the leadership during the MCO under the Honourable Pagoh had failed. I also wish to state that it is also very important that the GLCs, as arms of the State Government, are for planning for the future, and what we are doing now with the use of reserves is to sustain what we have. There is no point if we do not use the reserves and more people suffer at this time, because the damage is already done during the MCO, and what we have lost may not be recoverable. What we need to do now is to help. With Omicron, another new variant that has arrived, we must sustain what we already have now. At the same time, it is not a bailout of GLCs but GLCs for planning for the future, because we do not want that after the MCO, after this pandemic, the development of the state simply stops. Thank you.

Deputy Speaker of the HouseEN

Yes, Sungai Dua.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Honourable Seberang Jaya, I just seek a bit of clarification or agreement from the Honourable Seberang Jaya. In the 2022 Budget, revenue income is only just over RM400 million, whereas, as I said in my speech, the achievement up to October 2021 was over RM500 million, 113 per cent. So why was the estimate of revenue included so low compared with the 2021 achievement, and is there a hidden intention or something planned, by setting expenditure so high at over RM900 million, which by the end of the expenditure year will become lower, perhaps RM500 million, leaving a balance of RM400 million to reimburse back to non-revenue income? I see it happening like that. I would like your view.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Members who are interested in helping me in this debate. As I mentioned earlier, I did not question the decision on why we had to use reserves, because I understand that, since our revenue has decreased and we need more expenditure in a crisis situation, we need to do so, but this cannot continue; it has been two years in a row. What I meant earlier is that perhaps we need to rethink the special assistance given to the State Government's GLCs, because these GLCs should be the ones giving more revenue to the State Government, not the State Government bailing out these GLCs. That is why the strategy must change, because from my experience serving in the State Government before, as I understand it, the GLCs in the State of Penang do not have any assets or investments outside the State of Penang. Whereas other State Governments implement this through their State GLCs, and this is what I think we need to consider, because if we are thinking of the future of Penang, I have not yet touched on the Penang2030 vision, which I see may be affected and somewhat blurred by several issues, not only the COVID-19 issue but also the weaknesses in our own administration in the State of Penang, which have caused this vision to possibly be stunted.

Satees A/L MuniandyDAP · PHBagan Dalam

Lack of support from the federal government

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, the Honourable Member for Bagan Dalam, support from the federal government this has a lot of allocations from the Federal Government that were collected from revenue not only of the State of Penang but of taxes from the whole country and brought to the State of Penang too. In terms of building hospitals, which the State Government did not build, building health clinics, which were not built by the State Government, building bridges and roads, which were built by the Federal Government, all of that was built by the Federal Government, ports were not built by the State Government. So that is why, if we want to say that the State Government should receive a lot, it has received perhaps not in the State Government's accounts.

Lee Chun KitDAP · PHPulau TikusEN

It is not that the State Government does not want to, but the Federal Government does not want to give.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

But the benefits have been received by the people of the State of Penang, so that is why I did not have much time to apologise, so I wanted to, that is why, the Honourable Member.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Just one question, the Honourable Member for Seberang Jaya.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I would like to propose that the State Government look at strategies and also new measures on how we want to increase state revenue, not only by increasing taxes, not only by increasing tax collection, but in terms of new investment and new investments, where Penang has potential, so that is why I want to mention the Penang 2030 vision, where.. (interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Just a little, thank you, the Honourable Member for Seberang Jaya. Okay, I am interested in the claim about us using reserves. I request an explanation on whether using the State's own reserves is better than the budgets of some states that borrow from the Central Government, and another thing is that the Central Government itself borrowed with the people's money to buy vaccines. Earlier, Seberang Jaya said that vaccination was done well, supposedly to resolve the pandemic and so on, but are you aware, the Honourable Member for Seberang Jaya, that Pagoh borrowed money from the Tabung Amanah Negara to buy vaccines worth RM5 billion, even though RM3 billion had been allocated in the 2021 Budget? I request an explanation from the Honourable Member on whether the action of the Penang State Government using state reserves is better than other State Governments.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, the Honourable Member for Permatang Pasir, that is why, if the Honourable Member looked earlier, that is why I mentioned our reserves are only RM887 million now, what I mentioned is that we need to top them up. I did not say there is a problem with taking reserves, taking reserves is fine, but our strategy to increase revenue does not exist, that is why it is true, the Honourable Member for Pagoh did this in a pandemic, in a situation where we face a war whose enemy we cannot see, we used the existing funds to buy vaccines for the people, not to buy... (interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Those are the people's funds, the national trust funds, the people's money, whereas the budget has already.... (interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

The Honourable Member does not agree that the Federal Government should buy vaccines?

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

It should buy them, but not by using the people's trust fund money... (interruption).,

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

The people's trust fund is for use in emergencies... (interruption)

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

What happened to the RM3 billion in the budget that was approved... (interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Parents dying from COVID-19, children dying from COVID-19, wives losing their husbands, in that situation, are they not desperate enough, Honourable Member?

Muhammad Faiz Bin FadzilAMANAH · PHPermatang Pasir

Okay, that is why we use our reserved, that is why we use our reserved.. for our own sustainability. ...(gangguan).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I have no problem with the State Government using reserves. ... (interruption).

Deputy Speaker of the HouseEN

Permatang Pasir may sit down. Okay, Seberang Jaya.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

But what I mentioned earlier was about the revenue and how to restore the reserves... (interruption).

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

My boss says the problem is from Muhyiddin, my boss says so, what about that?

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I understand, the Honourable Member for Perai now supports my boss, it's alright, I have no problem, because I maintain my principle that we do not support kleptocrats, and also your boss. If the Honourable Member wants to support your boss, that's fine.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

But how about your boss who supports the current Government at the Federal level?

Deputy Speaker of the House

Minta sorang-sorang

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

I am telling you that my boss's view is supported by Sungai Dua.

Dr. Afif Bin BahardinPKR · PHSeberang Jaya

Disebabkan kalau Yang Berhormat Perai suka sangat nak quotekan bossku tak apa continue you can do it, Yang Berhormat you can say it in pergulungan.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

It is not that I support the root of the problems under COVID-19 earlier under Muhyiddin, the root of the problems.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

No, the root of the COVID-19 problem, we only got one enemy here... (interruption)

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

One question only, why did you say one thing before and say another now? Before you supported Pakatan Harapan, now you do not support Pakatan Harapan, how so?

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Honourable Member, Honourable Member.. ... (interruption).

Phee Boon PohDAP · PHSungai PuyuEN

Excuse me, excuse me.

Deputy Speaker of the House

Boleh tak?

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Yes, the Honourable Member, this is my friend, I have to let him.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you, number one in this august House. I would like to draw attention to the fact that he himself acknowledges that this budget here is not an election budget, compared with the budget in Parliament, where people say it is a budget for elections. Second, the reserves have fallen to as low as RM885 million. Does the Honourable Member for Seberang Jaya acknowledge that when this Government took over from the previous government, how much were the reserves at that time? This means that this Government is not playing politics, this Government has always wanted to safeguard the interests of the people, compared with the Central Government in Parliament. What is the percentage given to Bumiputera and how much to others? I do not want to make this a question-and-answer session here, but there is strong evidence that... (interruption).

Member for Seberang Jaya (YB. Dr. Afif bin Bahardin): Honourable Member, I thought if the Honourable Member wants to raise the issue of Bumiputera because of that distribution, I think the Honourable Member must see clearly that the majority of the population in Malaysia is still Bumiputera, including Bumiputera of Sabah and Sarawak, and the majority of people who still need assistance are not only Bumiputera but also the Indian community. We must accept that those who need help, we give help. ... (interruption).

Member for Bagan Dalam (YB. Satees a/l Muniandy): Seberang Jaya, we do not object to Bumiputera being helped because indeed they have been left behind economically, but it is unfair to non-Bumiputera at all if not from the mainstream of the budget, it's not fair, right. ... (interruption).

Member for Seberang Jaya (YB. Dr. Afif bin Bahardin): Honourable Member for Bagan Dalam, I want to discuss the Penang State Government Budget. If I want to discuss the Federal Government's budget, we wait for the next term if I enter Parliament. If not, I discuss the Penang State Legislative Assembly first.

Member for Bagan Dalam (YB. Satees a/l Muniandy): Entering from where? Shah Alam? ... (interruption).

Member for Seberang Jaya (YB. Dr. Afif bin Bahardin): Permatang Pauh where, later we will discuss, but what is important now is that I am the State Assemblyman for Seberang Jaya, I want to discuss the matter of the Penang State Government Budget. May I, Honourable Member?

Member for Permatang Pasir (YB. Muhammad Faiz Bin Fadzil): Repeating the mention of Permatang Pauh outside the House.

Member for Seberang Jaya (YB. Dr. Afif bin Bahardin):

No problem, Honourable Member, I have already said it... (interruption)

YB. Deputy Chief Minister II: I support Seberang Jaya contesting in Permatang Pauh. I support you. May I?

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): Thank you, the Honourable Member for Perai. I would like to continue, Honourable Member, on the Penang 2030 Vision. In this vision, I know I myself was involved in drafting the Penang 2030 Vision or Wawasan before, when I was still supporting Pakatan Harapan at that time. Among the major issues raised was how we make Penang a state that is competitive and able to progress in a sustainable manner, and among the major projects to be raised are the PTMP (Penang Transport Master Plan) and also the Penang South Reclamation. I have looked carefully at the Honourable Chief Minister's budget speech when discussing the PTMP and also the PSR, and I am somewhat worried because if we look at public response, the PTMP project has received very good support, including the road and highway projects to be built under this Master Plan, but unfortunately these projects are tied to the PSR (Penang South Reclamation Project), which is now tied to an EIA that will be resubmitted for approval. So I want to ask the State Government, does the State Government still have the political will to continue this project? This project not only attracts controversy in terms of its environment, not only in terms of politics, but has also been investigated at the MACC (Malaysian Anti-Corruption Commission, SPRM) level and is now in trial, including one involving the Honourable Air Putih. Only yesterday the Honourable Padang Rengas gave an admission in court that he received donations from contractors involved in the PSR project, the Transport Master Plan highway project, so I am worried... (interruption)

Deputy Speaker of the HouseEN

Sub judice here, there is a case in court, I ask Seberang Jaya not to touch on that case... (interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I did not touch on it, it came out in the papers.

Deputy Speaker of the HouseEN

I know.

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): I am only reading the paper, I can read the New Straits Times.

Deputy Speaker of the House

But its still in the house of justice...(gangguan)

Ahli Kawasan Seberang Jaya (YB. Dr. Afif Bin Bahardin); Nazri reveals of meeting with Yang Berhormat Air Putih and Zarul in a park at ShangriLa…(gangguan)

YB. Timbalan Yang di-Pertua Dewan; Seberang Jaya don't jump to conclusion.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang Pasir

Yang menerima itu tuan Timbalan Speaker, bukan daripada Pakatan Harapan, Nazri not from us, from BN, from his side.….(gangguan)

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

I ask the Deputy Speaker to make a ruling, so it is not that this is...

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): I cannot read the newspaper?

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · Perai

Not, surat khabar you bincang dalam you, walaupun ada kebal, it’s a sub judice. …(gangguan)

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

No, let me finish my speech, let me finish my question. …(interruption)

Member for Bagan Dalam (YB. Satees A/L Muniandy):

Point of order, Dato' Speaker.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Just a minute, Dato' Speaker, I think Afif, the Honourable Member from Seberang Jaya, I think you must understand this is a court case that is ongoing, agree or not? I am asking a question now, agree or not?

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): True, it's a court case.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Until today, agree or not? Listen and answer the question.

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): Honourable Member, this is my floor, Honourable Member.

I am asking you now so that I can get a ruling from the speaker.

Ahli Kawasan Seberang Jaya (YB. Dr. Afif Bin Bahardin); Let me finished the question.

You answer the question.

Dr. Afif Bin BahardinPKR · PHSeberang Jaya

Let me finished my question, saya belum habis soalan.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Now, is the case still ongoing, true or not?

Dr. Afif Bin BahardinPKR · PHSeberang Jaya

Betul.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Until this moment!....

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): I did not duplicate anyone.

Deputy Speaker of the HouseEN

I hope that topic does not need to be touched on.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Whoever can make any decision or any comment, listen first.

Dr. Afif Bin BahardinPKR · PHSeberang Jaya

This is my floor.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Only the judge in the court can make comments.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

True.

Member for Datok Keramat (YB. Jagdeep Singh Deo A/L Karpal Singh): So that is the reason why we have a provision in our Standing Orders stating that if there is anything in court that you agree is still before the court at this time, it cannot be discussed here!

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Okay, okay, I withdraw, Honourable Member.

Deputy Speaker of the HouseEN

Okay, Seberang Jaya, continue.

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): Let me refresh my question, okay, my question is about the future of the State of Penang in terms of the PTMP and PSR projects, because these projects are important to me, important because they maintain Penang's vibrancy as a progressive, competitive state able to attract investment and also create job opportunities for the people, but when these projects are tied to many controversies in terms of the environment, in terms of the unfinished EIA, and in terms of the court case that is ongoing, where is the direction of this project actually heading? What I am worried about is that we are holding invested time, we are holding invested money, we have been noisily debating this issue, but up to today we have not seen the implementation of the project. This is what I want to raise, Honourable Member. If we do not resolve this matter one and for all, then I fear Penang will lose its potential to become a more advanced state in the future.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Penang will not disappear from the world.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, the Honourable Member for Hang Perai.

Satees a/l MuniandyDAP · PHBagan DalamEN

I want to ask for Seberang Jaya's view, this PTMP, I want to ask only for the view on this PTMP, does Seberang Jaya actually agree, in the opposition, I think Seberang Jaya, when it comes to issues like PSR and PTMP, is more reasonable, he supports the efforts of the State Government because he was once part of the State Government before. I want to ask Seberang Jaya, do you agree if I state here that the PTMP project will bring benefits to the State of Penang, and at that time Seberang Jaya was part of the State Executive Council that made this decision. Were all the rules and procedures followed according to Seberang Jaya's understanding, when he was also an EXCO member at that time? If not, Seberang Jaya must also take responsibility, because he was part of the EXCO at that time.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, the Honourable Member for Bagan Dalam, for reciting my life history. Honourable Member for Bagan Dalam and also Members of the House, as I mentioned earlier, I think you have to hear me clearly. I indeed have no objection to this project, because if I objected to this project or did not support it, I would be a hypocrite, because I was involved in that committee before, in fact the 1st EIA was approved when I was in the committee, and I helped the State Government to obtain that approval, and that is why I wanted to mention earlier, what I raised earlier is that the PSR is related to the PTMP, the answer from or speech by the Y.A.B. Chief Minister, which depends on the approval of the PSR.

So that is why I hope the State Government can really think about how to resolve the PTMP & PSR issue today, because I see that during these two (2) years of the pandemic, that time should have been used to resolve this problem, but I see that did not happen, perhaps, perhaps because within the State Government itself there is no consensus among several parties in the State Government... (interruption).

Lee Chun KitDAP · PHPulau TikusEN

Excuse me, Honourable Member for Seberang Jaya, near your party, your own party coalition, they are not supported by them, that is why if you want to know why there is a delay, it is because you cannot ask.... (interruption).

Member for Seberang Jaya (YB. Dr. Afif bin Bahardin): Earlier we and the Honourable Member for Bayan Lepas mentioned, the Honourable Member for Bayan Lepas mentioned he does not support it. If backbenchers cannot convince Bayan Lepas, how can they convince the people? And I understand... (interruption).

Lee Chun KitDAP · PHPulau TikusEN

Honourable Member for Seberang Jaya, listen if.... (interruption).

Member for Seberang Jaya (YB. Dr. Afif bin Bahardin):

Even before this... (interruption)..

YB. Deputy Speaker of the House: Pulau Tikus. Honourable Member for Pulau Tikus, sit down.

Lee Chun KitDAP · PHPulau TikusEN

Honourable Member for Seberang Jaya. Okay, give way to the Y.A.B. Chief Minister.

Y.A.B. Chief Minister: We can accept that Members of the House do not support this project, but we will not accept any State Executive Council (MMK) Member not supporting this project.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I hope the Honourable Member for Penanti, Pinang Tunggal, everyone will support this project, as the Y.A.B. Chief Minister has just mentioned.... (interruption) The Honourable Member for Batu Maung, do you support the PSR project? The Honourable Member for Batu Maung, do you support it?... (interruption). It's alright, the Honourable Member can answer in the winding-up.

Deputy Speaker of the HouseEN

Honourable Member, do not direct questions to other Honourable Members – other Honourable Members, you face me and you talk to me, you do not drag other people into it for the YBs... involved, I ask all Honourable Members, Seberang Jaya, I give you another two minutes only... (interruption)

Member for Seberang Jaya (YB. Dr. Afif Bin Bahardin): No, Honourable Member, I have a lot more.

Member for Pulau Tikus (YB. Lee Chun Kit): Dato' Speaker, you have already given 20, two minutes for twenty minutes already.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I want to say something about the future of the state of Penang just now, when I wanted to say, I leave it to the state government to answer on this issue of PTMP & PSR. I want to raise the issue of industry in the State of Penang. I welcome the announcement by the Honourable Chief Minister to establish the new, larger Batu Kawan Industrial Park, which I am confident will help the efforts of the State of Penang to maintain its investment level of RM5 billion a year as its target. Although this year Penang fell to number 5 in terms of FDI, there are several core issues that I feel need to be resolved in the State of Penang. I agree. Just now the Honourable Member for Bukit Tambun raised the matter of land leases, which industry players have informed me about, especially myself, and have newly informed me about this leasing issue. It is hoped that it can be resolved so that they can look at bigger investments. At the same time, there is the issue of limited industrial areas, because I happened to previously chair the industry and new resources focus group under the Penang State Bumiputera Council. Among the issues raised is the need for new industrial locations for the Bumiputera community, who are also affected because they cannot afford them due to the high prices, the high price of land, and the lack of viability of Bumiputera industrial lot areas. I hope the State Government can consider this, perhaps not in terms of quotas but by also using the concept of hire-purchase for these Bumiputera industry players, so that they too can build factories in the State of Penang. When I asked why they want to build factories in Penang, they informed me that the address is important, that the Penang address is very vibrant and very attractive to other business partners, and we must acknowledge this. I also want to draw the attention of the State Government to the issue of the supply of skilled workers in technical fields for the State of Penang, because many large MNCs have informed me that they have to take on workers from outside the State of Penang because the domestic supply is insufficient. So there needs to be another effort, perhaps from the Honourable Deputy Chief Minister, Perai, and also the Chief Minister, to see how skills development can be further enhanced and how more young people in Penang can be trained in technology and science fields, because I am confident that Penang can become a hub or a state that drives the Industrial Revolution 4.0 and also catalyses the digital economy in line with the Federal Government's efforts under Malaysia's digital economy action plan.

Next, Honourable Member, I want to raise several issues in my constituency of Seberang Jaya. Firstly, I want to draw the attention of the Honourable EXCO for Sports to the Seberang Jaya swimming pool. I hope the State Government can look into upgrading and repairing this pool and turning it into a world-class facility in Seberang Jaya, because I have been fighting for this since 2013. Although I am now in the opposition, it does not mean the people of Seberang Jaya should be denied this development. So I hope for certainty from the State Government that the Seberang Jaya swimming pool can be improved. I also want to thank the Honourable Chief Minister and the State Government for enabling and ensuring the implementation of the Permatang Rawa Sports Complex project, the Permatang Rawa Mini Football Stadium, which has been completed and is the first synthetic turf field in Seberang Perai. I have also visited the place several times and played football there. Later, I hope I can arrange a special match with the Speaker of the State Legislative Assembly, the Deputy Speaker, on that field and…(interruption) just the two of us. We will do it. I will invite the other State Assemblymen to join the match, because the field is very beautiful and is indeed used by the majority of the community and football fans now. At the same time, I want to raise a big issue that I see is haunting us again. Why do I say haunting? Because during the MCO that thing did not happen, but once the MCO ended, that thing happened, namely traffic congestion. During the MCO there were no people on the roads, so there was no problem. Now that things have reopened, if on a Friday we from Penang want to go back to Seberang, it will take at least two (2) hours. If we want to go back this afternoon, it will take at least one (1) hour. Among these congestion points, I believe they occur at the roundabout in Seberang Jaya and several bottlenecks in the Perai area, and just after we come down from the bridge. So that is why I mentioned earlier that the Penang Transport Masterplan is important, because I do not want to sit in a car for two (2) hours. That is why I hope the State Government can also look at my area, Seberang Jaya, regarding upgrading the Seberang Jaya roundabout. Secondly, to also look at upgrading the Permatang Pauh road, because the Permatang Pauh road has become a main road that is still only one lane, now two lanes, for going and returning. If we can upgrade these roads, widen them and open new roads, I am confident it can slightly reduce the congestion occurring from there, and also that leading to the Penang Bridge, because…(interruption)

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Thank you to the Honourable Member for Seberang Jaya. I was interested in the arguments given by the Honourable Member for Seberang Jaya on this issue of traffic congestion. Does the Honourable Member for Seberang Jaya agree that one of the causes of this traffic congestion is that the Federal Government has cancelled the ferry service for our cars, precisely because people have no other way, so if the ferry service for cars is stopped, everyone will go to this bridge, which will cause traffic congestion? I want to ask for the view of Seberang Jaya.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Even with the ferry there is still a jam, Honourable Member. I do not see the ferry as a way of committing, but I do not see it as a solution. The solution must look at better public transport linking the Island and Seberang, which is very important, because we can see that the migration of the younger generation, my generation and below, the generation of Daniel, sorry, Pengkalan Kota and Bagan Dalam, where Padang Kota…(interruption), the new generation who want to buy houses, Honourable Member, the majority of whom take the opportunity to buy houses in Seberang and work in Penang because house prices here may be somewhat high. So they buy houses in Seberang, and Seberang now has many new townships and new housing estates being built. That is why I see that if we do not implement the Transport Masterplan immediately, which involves to ease the congestion between Seberang and the Island, it will to some extent disrupt…(interruption) decision... (interruption) disrupt the decision of individuals to choose to live in Penang...(interruption). Bukit Tambun, please.

Goh Choon AikPKR · PHBukit TambunEN

Seberang Jaya, just a moment. Seberang Jaya earlier touched on the roundabout in Seberang Jaya. In fact, the traffic bottlenecks in Seberang Jaya and Perai originate from the North-South Expressway, which is under the responsibility of the Malaysian Highway Authority. Therefore, I hope Seberang Jaya can convey this message to the Minister of Works, especially at the Penang Bridge junction. The Seberang Jaya roundabout is the junction between the BKE and the PLUS Expressway, and also the junction at Autocity. All the traffic bottlenecks in Seberang Jaya and Perai originate from roads or matters under the jurisdiction of the Federal Government. Thank you.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Member for Bukit Tambun. I raise this because I hope the planning is implemented on both sides, not only at the level of... because at the State Development Meeting chaired by YB Dato' Sri Reezal Merican, we also raised this issue through the ICU, and I hope the State Government can also help us look at this planning, because in the end it will help solve this problem for all the people of the State of Penang...(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Seberang Jaya, just let me add a little to this issue because it is also related to Bagan Dalam. Seberang Jaya, Perai and Bagan Dalam are neighbours, and this traffic issue is a headache we face, not only when we return to Seberang from the Island, but every morning from Butterworth until they want to go to Bandar Perda. It will take time; if you leave home at 8.00 it will take 45 minutes just to pass along that particular road. So I ask for this, and I support Seberang Jaya. The State Government and the Federal Government also need to find a way, especially at the bottlenecks where I see there is still a large road reserve that has not been developed at all. So there must be planning, and we must hasten the widening of these roads as quickly as possible. As when we come down from the bridge, the bottleneck occurs because all the cars get stuck on that narrow road. Now there is already a connecting road between Seberang Jaya and Perai via the Prai Industrial Area, so there must be a dedicated exit to enter the Prai Industrial Area, and this will as much as possible also reduce congestion on the bridge and in the other parts of the exit. Thank you…(interruption).

Deputy Speaker of the HouseEN

Honourable Member for Seberang Jaya, two minutes more.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

5 minutes more?

Deputy SpeakerEN

Two minutes more. I also have a target.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you. Thank you, Mr Speaker, Deputy Speaker, for giving me the opportunity to debate this afternoon. I would like to say thank you once again and express my highest appreciation to all government agencies, both the State Government and the Federal Government, and to all frontliners for helping the efforts of the State Government and all of us here in tackling the COVID-19 problem. I hope the State Government will take seriously the views from us on the Opposition side, because surely our aim is the same: we want the welfare and the future of the State of Penang to be secured, and we can together develop the State of Penang after this COVID-19 pandemic. That is why I want to support the motion proposed by the Honourable Member for Bertam regarding the need for equal allocation between Opposition State Assemblymen and the Government, because in the end these allocations will be channelled to the people. These allocations will be channelled to those in need. Moreover, in the current situation at the Federal Government level, Members of Parliament also receive the same allocation. I believe the Honourable Chief Minister also receives allocations from the Federal Government. If the Honourable Chief Minister does not want to spend that, it can be handed over to us, and we can spend it. Once again I thank the Members of the House and the Honourable Speaker of the State Legislative Assembly. I hereby do not support the State Government of Penang's budget.

Deputy Speaker of the HouseEN

Please repeat that once more, Honourable Member for Seberang Jaya.

Dr. Afif Bin BahardinPKR · PHSeberang Jaya

Tidak sokong.

Deputy Speaker of the HouseEN

Yes, Permatang Pasir...(interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Bismillahirrahmanirrahim…(interruption) Alhamdulillah al amin….mursalin…thank you, Honourable Deputy Speaker, for giving the opportunity…(interruption).

I support that because there is an MOU. We in Penang do not need an MOU. We are almost, strong majority, we have a strong majority...(interruption).

Deputy Speaker of the HouseEN

Honourable Member for Permatang Pasir, your time has started. Okay, I'm recording your time…(interruption)

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Thank you for this opportunity. First, I would like to record my thanks and appreciation to the Penang State Government. Over the two (2) years we have faced a phase of life that is very challenging, a very challengers phase in our life, that has never happened before, unpredicted, and......The Penang State Government has been prepared and has also disbursed various financial assistance, which we call cash handout….(with permission) Honourable Dato' Deputy Speaker, and also assistance, people's assistance packages to various segments or economic sectors, which are now gradually recovering, and in helping them to drive their business fields, especially PKS (small and medium enterprises), and so on. Thank you also. Before I debate the Penang State Budget 2022, I would first like to record my thanks to all government officers, especially the frontliners, who have devoted all their dedication, time and energy to ensure that Penang Lawan COVID truly succeeds, and this effort, God willing, will continue. Together we strive, because proactive effort and togetherness will produce very good results. I would like to take the words of an Indian politician, Sonia Gandhi, who said, "together we can face any challenges as deep as the ocean and as high as a sky". So togetherness, or kebersamaan, has shown very good results, where Penang's economy has now been revived, and many visitors from across the country are coming to Penang. We hope for the readiness of our frontliners and our officers to face whatever possibilities may occur, and we pray for one another that this pandemic will end. We are indeed in the final phase of the pandemic, and the whole nation is ready for the COVID-19 endemic phase at the national level in general and at the Penang level in particular. What is important is how we look at long-term solutions, or jangka panjang solutions. Cash handouts and people's assistance packages, which amount to approximately RM176.45 million, are a short-term solution. But how do we look at the methods, plans or policies that need to be formulated by the Government to ensure the continuity or sustainability of Penang's economy, or what we may call sustainability. How do we ensure that the economy of the people of Penang remains stable and continues to be sustained.

And here we need to look at how we can find or create projects that are able to stimulate the economy. This is because the most important thing during this pandemic is that we have lost many jobs. If we look at the statistics of the Department of Statistics (Jabatan Perangkaan), across the country unemployment or jobless figures have reached almost 700-800 thousand. We cannot set aside this unemployment problem in Penang, and in the coming years we will also face the same situation because the population of Malaysia is increasing and the number of graduates from universities is also increasing every year. But they do not have good job opportunities, or there are no job opportunities at all. Here, we as the legislative branch need to adopt an honest stance on how we can support the State Government's efforts to create economic projects that can stimulate the economy below, in the sense that job opportunities can be created. Business opportunities can be created, helping the PKS below. Therefore, when we talk about several projects mentioned by several ADUN here, about the PTMP project and the PSR project, we as ADUN, I hope we are honest with our views. Some support, some have views, some oppose, and they have views, but let those views be honest, honest from the perspective of being constructive, on how we can give a view that can build, or a view that can add value to this project.

It is not that we attack this project, or oppose this project on the basis of race, on the basis of creating political polemics, taking political advantage solely to win support from the people below, when the people outside are thirsty for the Government's support. We cannot allow the people of Penang to live without work. Certainly there will be groups that are affected. I understand this issue because when we were in government before we were toppled by the 'Langkah Sheraton' backdoor, I steered an entity that manages the welfare of fishermen, the economy of fishermen across the country, called LKIM.

So we understand what fishermen need. What fishermen need is a form of assistance from the Government to stimulate their economy. We cannot let fishermen remain trapped in old methods, traditional methods. We want modern fishermen, fishermen who can go to deeper seas so that their catch is greater. With a greater catch, they can increase their income, and this is why we say that when we criticise this issue, we need to see how we can help this group. It is not merely that we oppose without any constructive opinion or view that can add value to this project for the maslahah of the people of Penang in general and also for the interests and welfare of the fishermen. Therefore, when I asked the State Government questions about what assistance or compensation had been proposed in meetings with fishermen, the answers given were ex-gratia, ex-gratia assistance, cash compensation, assistance for boats and engines, construction of new jetties, there is a tuition scheme or free tuition education for fishermen's children, and there will be a Perumahan Mampu Milik project that will give priority to fishermen. All of this shows that the State Government has given priority, namely placing these fishermen as a group that is given priority in how to solve their problems.

So here we need to be honest. We as legislative members in this state are responsible for jointly developing this state, whether we are at the ruling party level or at the opposition level. We have that responsibility. We need to be honest in our politics. If this project is good for the State of Penang, the future of Penang, sustainability of our people, why can't we support this project, if, when we see that there are shortcomings,

there is leakage in it, whatever leakage or loopholes there are in this project, we give opinions that can add value. Therefore, in my meetings with fishermen, the fishermen's leaders, when I led LKIM before, I said to them that what needs to be discussed is how we can pursue several matters that can develop our economy, and I believe these three (3) islands will involve a small part of the sea, whereas the sea is wider, and fishermen should be encouraged to go to deeper seas. This is what needs to be looked at. I also advise my friends in the PAS party and the UMNO party not to play with political sentiment. We were affected when the former Minister of Agriculture and food industry, the food industry, before the previous Deputy Minister, before Tan Sri Muhyiddin was toppled, came to Penang and stated that this was the Penang State Government's effort to drive out Malays. This is a sentiment that is being played, which is not good. Do not manipulate this issue for the sake of gaining cheap political interests. So we need to be honest. I repeat once more, so that the economic sustainability of this state, moreover as we have just come out, or are coming out, of this very challenging phase, the pandemic phase, and we are entering the endemic phase, and we will see Penang moving towards 2030, Penang2030, and then we want our children, we want the young people outside there, those still in school, those still at university, to have job opportunities. This is among the projects that will help the people of Penang, and I also look at the issue of sustainability. We do not, the State Government also needs to mobilise these GLCs as the tools of development, the tools of economic growth, as an instrument or a machinery to drive the economy below. The GLCs in Penang need to play a more active role in how to help the traders below, or we categorise them as PKS, to generate more business opportunities and, subsequently, drive the economic prosperity of these people. I would like to propose, among others, that the Penang International Convention & Exhibition Bureau organise an online trade exhibition, or with permission, Deputy Speaker, a Virtual Trade Show, free of charge, where PKS can market their products and services directly to industry players. This Virtual Trade Show can also hold business matching sessions where PKS in this state can be connected with interested buyers or vendors. But that aside, I also would like to propose that Penang Halal International Sdn. Bhd. provide matching grants...(with permission) to help more PKS introduce halal products and, subsequently, be assisted to penetrate the global market. We need to help these PKS to market their products. The problem beneath it is their access to the market. Many people, especially Malays outside there, who are capable of producing food products, especially TERutamanya, but the access to the market is the crucial problem here, so we use their assist, such as this Penang Halal, to help these PKS market their products. I also would like to propose that the State Government act as a guarantor for PKS to purchase raw materials on credit from vendors. Apart from the cash handouts we have given before, there is still, when there is, even in the budget, a mention of the Pinjaman Harapan amounting to RM1.0 million, but this may not be sufficient, so I propose that the Government become a guarantor, become a guarantor for this easy credit loan for purchasing raw materials from vendors, and it can also be channelled through GLCs to help the PKS under them. I also would like to propose that, in facing this endemic, it is not only the problems I mentioned earlier, which are first, the problem of job opportunities, second, helping the PKS group, which we know is now burdened, and third, I

would like to draw the attention of this House to how we are to deal with the issue of the cost of living. Today, the issue of the cost of living has become a very critical issue faced by the people today. Across the country, there is an uproar over rising prices of goods, rising prices of food. Oil has gone up, onions have gone up, vegetables have gone up, meat, eggs, everything has gone up. This is closely related to the agriculture industry, or the farming industry. We cannot escape this problem because food is the essence of our life. The essence of our life is food, which is why we talk about food security in the country. If we take the statistics, total agricultural imports in the country have reached more than 50 billion every year. This is a worrying matter, as if this country regards agriculture as not an important sector. That is why the State Government of Penang's effort to implement a project that we call ZIA (Aquaculture Industrial Zone) at Kepala Batas must be viewed thoroughly and must be continued. If it is permitted in terms of its environment, its EIA, and because this can provide not only job opportunities and business opportunities to fishermen, but can also produce more food products, our own food products. And further, with more agricultural products or fresh ingredients being supplied, automatically, from the economic perspective, goods will become cheaper. The problem occurring today is the problem of disruption in the supply chain, in the in the in the in the supply chain, where there is disturbance that causes prices to rise, supply to decrease, or supply to be manipulated by middlemen and so on. That is what causes prices to rise, and when prices rise while people are losing their jobs today, people will become increasingly burdened with empty pockets. Goods prices rise, and inflation even increases, and this will subsequently mean that the burden will be borne by the Government. In the end, in order to help the people, this is why we need to look at the issue of food security in the State of Penang.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

Thank you, the Honourable Member for Permatang Pasir. As a former LKIM, do you agree or not, Honourable Member, that this price increase is related to the COVID-19 case, which has restricted movement across the world, and it also restricted food production across the world, and this is something we had estimated would happen, and all countries made preparations for it, but the effect of COVID is greater. It is not merely being disrupted by political hands or middlemen only, but it is the effect of COVID that we all have to bear together.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

The Federal Government, The Federal Stage, Federal Level, if they had a political will to mitigate this problem at an earlier stage, it would not have happened. That is why there must be political will. The preparation must be there. If we already anticipated that the price of goods would rise during this pandemic, the effects of this pandemic. What were our preparations? But there were none, why? Because they were busy with politics. An emergency was declared and so on, and in the end the government changed. The government changed not as a result of pressure from Pakatan Harapan but from the struggle among the parties within Pakatan Nasional itself. UMNO against UMNO, which caused the government to fall. For 18 months we wasted time on political polemics, there was no political will on the part of the Government, Cabinet Ministers, to look at the importance of solving this problem from the beginning. Why do I say this? Because no early method was established.

We are talking about the price of goods. I said in the economic formula earlier, when supply increases, prices will fall. So throughout the pandemic, no scheme was planned, but we proposed it, I issued a joint media statement with the Honourable Member Sim, former Deputy Minister of Agriculture. We proposed that the Ministry of Agriculture, through the Malaysian Fisheries Development Authority (LKIM), implement a "Buy Back Scheme". Because during the pandemic there was a glut of agricultural produce, especially from the fisheries sector. Many catches were not sold. There was a glut. They were simply thrown away, even dumped into the sea. We raised not only the issue of wastage but also how we can ensure that the problem of rising prices does not occur. If there are schemes like this, a "Buy Back Scheme", the government buys early, the government is ready with all its cold rooms, its cold rooms storing fish, storing these agricultural products, so that when there is a shortage of supply, the shortage of supply now, or the demand is high today, we have our supplies to market to the people. And this can control the price of goods. And likewise, when the Pakatan Harapan Government was in power, we had a scheme. A maximum price during festive seasons. Those were the methods taken by Pakatan Harapan, which had the political will to mitigate price increases of goods. But throughout the time Pakatan Nasional was in power, including the 100 days when Ismail Sabri was Prime Minister, we did not see what that political will was. In fact, the answers given by ministers hurt the feelings of the people. When prices rise, the whole country is in an uproar about rising prices. They said, they answered, that it is not a burden on the people, it does not burden the people. This is an unsympathetic answer. That is why I say that the answer from my friend, it's not, is not related to the pandemic. But there is no political will on the part of the Federal Government to solve the people's problems. We can look at the economies of neighbouring countries, Indonesia, they are developing very well. To the extent that domestic investment, Hyundai, Toyota, has run away from Malaysia, run away to Indonesia. Because they manage their economy better than our country. That is why do not blame the pandemic. The pandemic is not the problem. The pandemic is a challenge to us. It's our new norm, a new normal, but the failure of the government, which is made up of my friend, in Pulau Betong, Teluk Bahang, I apologise. Teluk Bahang, its own party that failed. So it would be good to bring this issue to the party's annual general assembly and question the leaders there about their failures. So, returning to the issue of food security in our state. We need a sharp and firm vision, on how we are going to create these agricultural products so that food security is guaranteed. The supply to the people of Penang is guaranteed. It is not a matter of whether supply is sufficient or insufficient, it does not consist only of that, but the supply must be of quality, quality not only in terms of the freshness of the food but also in terms of price. So when there is that quality, then we can guarantee a quality life for the people, which we call a just life for the people. Does the Leader of the Opposition want to ask something?

Thank you Permatang Pasir. I strongly agree with what Permatang Pasir said about food security. And I have also mentioned in my speech, we need to raise agriculture to a better level. Even greater, because we want to supply food to the residents of Penang. If we do not have to buy from outside, do not have to import, perhaps the problems of rising prices and so on would not occur. So, is an allocation to agriculture of just RM6 million sufficient? Veterinary RM3 million to develop agriculture in a better concept, a more modern concept. The agriculture side, the State Government side, must think about what concept to adopt for the State of Penang

for its residents, who are only about 1.82 million, whom we must meet, while even paddy has not yet reached the SSL level. That is what we are worried about, because we have to ask the State Government to look at this matter, to see this matter as the most important thing. Agriculture is the most important. Indonesia is not difficult because it has agriculture. Every house has a vegetable garden, every house has a fish pond. It can eat, there is no problem even when there is an economic downturn and so on, even if the wages are low there is no problem. That is what is happening in other countries, we must look at it. The concept of agriculture in Thailand, we must look at it. To develop it in the State of Penang. Insya-Allah.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Thank you Leader of the Opposition. Indeed the allocation is small compared with the needs for food security. Dato' spoke about SSL, sufficient level, all of that must be looked at, and if there is a need to add to the allocation for agriculture, I think all ADUNs, including Seberang Jaya even though he is not present, may also support the use of state reserve funds for the continuity and sustainability of food security in our country. So, speaking about agriculture, I would like to make a proposal, apart from the "Buy Back Scheme" I mentioned earlier, we must also be able to create, that is, look for a long-term solution, Deputy Speaker, namely neighbourhood farming, as we call it. We have smart farming, we have vertical farming, which has been mentioned as very popular overseas. Smart farming uses various technologies today, AI, drones and so on, that capacity needs to be enhanced. We need to create neighbourhood farming, namely that idle government-owned land in every DUN should be developed for large-scale vegetable cultivation. Do not do it only in Penanti. Do it in all DUNs as well, because Penang involves 40 DUNs, so that need must be looked at. If in Pulau, in KOMTAR, perhaps there is no land. We can implement vertical farming. All of this can be done as long as we have political will. Because nowadays is the age of technology, of science. Do not look at agriculture as a sector that causes losses, but it is actually a sector that is profitable, Deputy Speaker.

Just a little to add. I once proposed in an earlier speech that we create a hectare equivalent concept because we have little land in Penang. Only the villages have land. The hectare equivalent is something the Department of Agriculture (Jabatan Pertanian) may understand better. We build the concept like what I just gave for lime trees, lime nipis and lime kasturi in the villages. I will choose villages including in Permatang Berangan to create one village, one commodity, so that if each person is given 10 trees, if there are 20 people that is 200 trees, if the lime trees are nearly 2 acres, a little more than one acre. So perhaps we can do the important thing, we must appoint one person to handle marketing. In a concept involving many people, one person handles marketing. So he will market it. So there is no problem if we want to ensure we can supply food to the community in this hectare equivalent way. That we can implement. The Department of Agriculture is well aware of this matter. Thank you.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Thank you for the good proposal from the Leader of the Opposition.

Deputy Speaker of the HouseEN

Permatang Pasir has one more minute left. I have already given you extra time. Even though this game has no context?

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

There is still a lot, even if only a strand, but there is a lot.

Deputy Speaker of the House

Faster, faster.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Okay, back to that neighbourhood farming. We create one green zone for each DUN. Whether by way of vertical farming's, smart farming, but the important thing is, we have one source of agricultural produce in each DUN from which B40 groups or asnaf can obtain these sources of agricultural output, vegetables or broiler chicken farming, at a lower price because the supply chain, the chain of supply, we can shorten. It becomes an economic philosophy that the price of goods can be reduced if we can shorten the supply chain. We have no disruption in this supply chain. So this must be looked at over the long term. This is a long-term solution. It's not a short-term solution but a long-term solution that requires political will and also support from the people at the grassroots. Not only can we create employment opportunities, or business opportunities for SME groups, but we can also help the people to fatten their pockets because they get goods at low prices. When I led LKIM before, I can share that we increased the number of fish markets. Fish markets were built in areas with fishing jetties, where the fishermen themselves sell. Fishermen catch their produce at sea and bring it to the jetty, their wives sell it. There are no middlemen exploiting them, and consumers or customers can buy at low prices, and this helps the people. So these are among my proposals on how we can ensure food security is guaranteed, and thirdly, the group I want to emphasise is the youth group who are heavily involved in today's gig economy. The Government has helped up to 38,000 entrepreneurs involved in this gig economy, and as a result, within five (5) months, RM10 million in revenue was generated, and I hope more GLCs will help the Penang State Government, help these gig economy groups, because it is a new economic sector, one that is seen as able to help the youth, young people out there, to obtain their sources of income. I have a few issues… (interruption).

Deputy Speaker of the House

Permatang Pasir.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Just a little. I ask for five minutes.

Deputy Speaker of the HouseEN

Injury time is already out, fracture time is also already out. The game is also over. Thank you Permatang Pasir.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Five minutes, five minutes. I have a local issue. Five minutes. I will go… (interruption).

Deputy Speaker of the HouseEN

The Honourable Member who is about to enter will not get time… (interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

I will get it, I will go point by point. That is all.

Deputy Speaker of the House

Point to point please.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Thank you Deputy Speaker. The next is a local issue. I look at balanced development between urban and rural areas. The problem in rural areas is unbalanced development from its root, from the roots problem, namely excessive sale of tanah lidi (lidi land). When tanah lidi is sold excessively without controlled infrastructure facilities, and eventually causes flash floods and so on when these houses are built. So the State Government needs to take proactive steps to enact the laws necessary to control the sale of tanah lidi, which we know from applications to change the conditions and so on, or the development taking place aims to sell land for bungalow lots. Furthermore, I also request the State Government to review the allocation to ADUNs, especially P16(2), which we see is too small, an allocation of RM180,000 a year is really not enough with the rising price of iron, with the very high price of construction equipment today, we can provide many infrastructure projects to the people, whereas we in the rural areas of Permatang Pasir need more infrastructure development projects for the residents there, and with an allocation of RM180,000 a year it is really not enough.

I hope for a higher increase in the amount, and I also request that the circular called the Penang State Financial Circular No. 3 Year 2010 be amended, because the problem I am facing now is that there are several applications from individuals for us to repair their houses, but they cannot be approved because it is included in this circular, which does not permit it. I ask for an exemption for the houses of these poor people. If we want to help them obtain assistance from AES, it cannot be done because the AES conditions are very strict, namely that the salary must be RM1,500.00, whereas a salary of RM1,500.00 is too easy to reach. So if we want to help those under us, we need to loosen this circular, because we at the ADUN level have allocations but cannot use them. So these are all bureaucratic matters that need to be looked at again, that need to be reviewed by the government for the interest of the people, not for the interest of the ADUNs but for the interest of the people, Deputy Speaker. I would like to ask for the goodwill of the local council not to take drastic action against the roadside food stall traders here. We have received complaints that they are being prevented from trading and so on because of complaints of traffic congestion. If Deputy Speaker looks at the actual situation, what causes this congestion is not the stalls but the buyers who stop at the roadside. If these buyers are disciplined enough to park their vehicles in the designated places and walk to these stalls, there would be no congestion, but the problem is the lack of discipline among buyers who buy at the roadside. Parking vehicles at the roadside causes congestion. So we need to be smart in managing this matter… (interruption).

Deputy Speaker of the HouseEN

Thank you Permatang Pasir.

Yang terakhir.

Deputy Speaker of the House

Terima kasih.

The last thing I want to mention is… (interruption).

Deputy Speaker of the House

Just the point will do. You no need to such exaggerate.

I also request a new market in Permatang Pauh. We have government land that can be developed, because Pasar Sama Gagah is already very congested. We are facing an endemic and need a large market, and I also request that PPR houses be built in Permatang Pasir, and finally… (interruption).

Deputy Speaker of the House

Tidak habis-habis.

Last, last is about Khaira Ummah. For the allocation of RM350,000, I hope the Penang Government and the Islamic Religious Council (Majlis Agama Islam) will look at how to build this best ummah in terms of understanding the concept of unity, the concept of tolerance, so that no division arises among the Malay community especially. The Malay community must be progressive and dynamic and understand the attitude of tolerance, unity and also integration in society. I thank once again… (interruption).

Deputy Speaker of the House

Sokong?

Wait first. Thank you to the Deputy Speaker for giving me the opportunity. Thank you to the State Government for having given much assistance to the people. With this, I beg to support.

Deputy Speaker of the HouseEN

Thank you Permatang Pasir. Telok Air Tawar, Dato' Telok Air Tawar, you have the floor.

Dato’ Mustafa Kamal Bin AhmadPKR · PHTelok Ayer TawarEN

Assalamualaikum warahmatullahi wabarakatuh. Peace and well-being. Bismillahirrohmanirrohim (In the name of Allah, the Most Gracious, the Most Merciful). Honourable Dato' Deputy Speaker, the Honourable Chow Kon Yeow, Chief Minister of Penang, heads of department, and gentlemen and ladies whom I respect all. Thank you to Dato' Deputy Speaker for giving me the opportunity to take part in the Penang State Budget Debate for 2022, which was successfully tabled last Friday. Alhamdulillah, the highest gratitude is offered to Allah Subhanahu Taala, for by His permission and grace we are able to gather in this honourable House. First, I take this opportunity to congratulate the Honourable Chief Minister on the tabling of the balanced and inclusive 2022 Penang State Budget, which does not neglect the welfare of the people, under the theme "Mempercepatkan Pencapaian Penang2030" (Accelerating the Achievement of Penang2030). It has three (3) main initiatives, namely local initiatives, community development initiatives and industry engagement initiatives. I am confident that the Honourable Chief Minister will continue to lead the State of Penang to greater heights of success.

Honourable Dato' Deputy Speaker, in this sitting we are still in a situation that differs from the norm and its customs. At this time our country is still struggling in efforts to combat the spread of COVID-19. Nevertheless, we have faced and tackled this outbreak united as a strong, resilient and disciplined Malaysian nation in this difficult time. The nation's frontline personnel, especially health services, the Malaysian Armed Forces, the Royal Malaysia Police, the Fire and Rescue Department of Malaysia, the Immigration Department of Malaysia, the National Disaster Management Agency, the Malaysian Civil Defence Force, the Malaysian Volunteer Department and other agencies that are also involved, have stepped forward with a high degree of dedication to face the situation of this outbreak. Their sacrifices know no exhaustion or fear, to the extent that their own lives and safety become a demand in order to protect the welfare and interests of the public. Honourable Dato' Deputy Speaker, I take note that the COVID-19 pandemic has had a worrying effect on the economic paradigm significantly, in which it has changed the global lifestyle in every state through the implementation of quarantine and movement restrictions. As of 30 June 2021, the State's economy recorded revenue collected amounting to 76.46 per cent of the estimated annual revenue for 2021, compared with 90.06 per cent of revenue collected for the year 2020. Based on those statistics, I am confident that this is the time for us to look back, reassess achievements, study the strengths we possess, and also identify areas that can be improved in facing the challenges ahead. The coming period is not only important but can also be considered critical. We must make effective and continuous efforts to ease the burden of the people and ensure that the economy and development agenda continue despite being pressed by a prolonged pandemic and an outbreak that has not shown any sign of ending in the near future. I hope the assistance channelled by the State Government reaches the target groups and affected groups accurately and on time, to ease the burden of certain sections of the people so they can continue their survival. Honourable Dato' Deputy Speaker, I welcome the State Government's intention to instil the culture of the Industrial Revolution 4.0 in education with the vision of Penang2030. The Industrial Revolution 4.0 is the empowerment of industrial and commercial management structures that emphasises the development of digital technology to reduce human labour costs...(interruption).

Deputy Speaker of the House

Your tie is not straight.

Dato’ Mustafa Kamal Bin AhmadPKR · PHTelok Ayer TawarEN

And increasing productivity. Thank you, Dato' Mr Speaker. The developments of the Industrial Revolution 4.0 have a direct impact on various fields, including the field of education, because it forms the foundation for providing the workforce of the future. Therefore, emphasis on the education sector is a necessity so that the workforce produced through the national education system can meet the needs of the job market based on revolution 4.0, which is high-technology, such as science and sports. The Digital Technology System also facilitates the use of data on a wide scale and globally to enable various work to be carried out quickly and with effective long-term cost savings. Academic dance classes must be improved by applying digitalisation elements

in the mainstream of learning, which will certainly help students' achievement while also educating their minds to be better prepared for career and life competition. The world is changing day by day, and so is the learning system; we must all accept the fact that digital education knowledge has become the pillar of knowledge in ensuring academic achievement can be utilised, otherwise later, better later. Penang must make digital education a resource that moves towards a competitive society; learning in digital education is an investment in human resources and a moral responsibility. As a result, the State of Penang will be able to provide a workforce that is equipped with soft skills and intellectual capacity to face the challenges and markets of the future. Honourable Dato' Deputy Speaker, I also record my gratitude that the State Government continues its efforts to safeguard the welfare and well-being of the people, especially children, women, senior citizens, persons with disabilities and those in need. To strengthen the protection and rights of children, efforts are taken by the government to ensure that they are not exploited in any form and, at the same time, that their full potential can be realised. I also welcome the i-Sejahtera programme, which is continued with an allocation of RM50 million to establish the Mutiara Food Bank Operations Office in Seberang Perai, special financial assistance, the Homeless Transit Centre and others, which give a new dimension to the welfare landscape of the State of Penang. In the meantime, affected groups must continue to be helped so that they can receive appropriate benefits. Therefore, I request that the government also be committed to improving equitable access to welfare services for the people in a holistic manner. Honourable Dato' Deputy Speaker, every year the State of Penang becomes the preferred destination of many tourists from all over the country and abroad, as a result of continuous promotional efforts by the State Government. Indeed, the tourism sector is among the sectors severely affected by the spread of COVID-19. However, I believe the State Government can still focus at this time on domestic tourism if the Malaysian Government allows interstate travel. As a tourism state rich in cultural and historical elements, the State Government of Penang is hoped to remain committed to reviving this sector by ensuring that existing tourism products consisting of history and culture, recreation, education, sports, health, conventions, food, shopping centres, agro-tourism, exhibitions and others always remain in good condition. In addition, continuous efforts are necessary to help tourism developers remain actively engaged when they are allowed to operate. Therefore, I agree with the State Government's plans to revive a higher level of attraction to tourism in Penang. Among them is developing the local economy and encouraging domestic spending by reintroducing Experience Penang Year as a tourism campaign theme. With the launch, the launch of the Penang Tourism Master Plan 2021 and 2030 on 3 May 2021 last year, it is hoped that it can help and drive the growth of the State's tourism sector until the year 2030. In addition to setting goals in developing sustainable tourism in Penang as well as strengthening Penang's competitive position as one of the main tourist destinations.

Honourable Dato' Deputy Speaker, once again I would like to thank the Penang Government for deciding to continue four (4) programmes

to encourage the use of public transport in Penang, involving expenditure of RM10 million. The programmes are as follows: (i) Continuing the BEST Komtar Service; (ii) Continuing the Free Bus Service; (iii) Financing the Unlimited Travel Pass, namely the Mutiara Pass; (iv) Financing the Penang Ferry Service fares.

Honourable Dato' Deputy Speaker, in living the new normal life, the people of Penang need the focus of all Honourable Members in solving all problems. As State Assemblymen, every action and conduct of Honourable Members always attracts public attention. Therefore, I request that Honourable Members practise noble values so that they become an example to the general public and reflect the maturity of leaders. Let us carry out transformation, become a foundation towards teamwork and provide the best service to the people and the State of Penang that we love. In conclusion, I pray that the State and people of Penang continue to receive the protection of Allah SWT and are always showered with His mercy. So that the multiracial people can together strive to ensure peace and prosperity that can be passed on to future generations. Sekian, wabillahi taufiq wal hidayah (That is all, and with Allah's guidance and grace). Assalammualaikum Warrahmatullahi Wabarakatuh. I beg to second the motion.

Deputy Speaker of the HouseEN

Thank you, Telok Air Tawar. Honourable Members, the House is adjourned and will sit tomorrow morning at 9.30 am. Thank you,

The House was adjourned at 4.50 pm.