Pulau Pinang · 2 December 2021

14th Assembly, 4th session, 2nd meeting · 316 turns · 38,486 words · official PDF ↗

263 of 316 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

Absent: Lim Guan Eng (Air Putih), Datuk Seri Saifuddin Nasution Bin Ismail (Pantai Jerejak), Dato’ Seri Abdul Razak Bin Jaafar (Setiausaha Kerajaan Negeri)

(Opening)

Secretary of the HouseEN

Honourable Members, Honourable Speaker of the State Legislative Assembly. Recitation of prayer. Oral questions

Speaker (Speaker)EN

Good morning Honourable Members, we reconvene, and today's oral question session begins with inviting question 40.

Lim Siew KhimDAP · PHSungai PinangEN

Dato' Speaker, my question is No. 40. No. 40. The Keluarga Malaysia Concept was launched by the Federal Government under the leadership of the Prime Minister recently. (a) State the plans that will be taken by the State Government to ensure this concept can be realised in Penang, and whether there are any allocations for making this strategy a success for national recovery?

Y.A.B. Chief Minister: Thank you Dato' Speaker, thank you Honourable Member for Sungai Pinang for the question on the Keluarga Malaysia Concept. For the information of this august House, the objective of Keluarga Malaysia is as a long-term aspiration that is resilient to future challenges in achieving the status of a developed nation with high income, based on or grounded in achievement and happiness. Indeed, the Keluarga Malaysia Concept that has newly been introduced is in line with Wawasan Penang2030 Negeri Pintar Dan Hijau Berteraskan Keluarga Inspirasi Negara. There is no special allocation dedicated to the implementation of the Keluarga Malaysia Concept in Penang, and if what we are doing for Penang2030 can also be considered as part of the effort to achieve the objectives of Keluarga Malaysia. The State Government will always stand shoulder to shoulder with the Federal Government to make this strategy a success for national recovery. However, on this occasion I would also like to express views based on the public reaction to what has happened in the country since the Keluarga Malaysia Concept was introduced, namely in relation to Budget 2022 regarding allocations based on ethnic groups, and also the Prime Minister's wish to accelerate the Bumiputera agenda and related policies, which have raised questions about the values within this concept, including Inclusiveness, Togetherness and Gratitude. If these issues are not addressed, then the Keluarga Malaysia Concept will remain just a concept and will not achieve the desired objectives.

Speaker (Speaker)

Terima kasih.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you, Padang Kota. If, as Padang Kota has said, there is no allocation to make that strategy a success, and as was mentioned just now, that if the three (3) concepts, the three main pillars of Inclusiveness, Togetherness and Gratitude, are not, then they are merely a slogan or a concept that is only spoken, then what about the State Government? What steps can be taken so that the people of Penang can see and benefit from them, if there are any programmes? If there are none, I feel that just as Padang Kota said, Inclusiveness, will it really be implemented, Togetherness, which is important? So what about Penang? Thank you.

Y.A.B. Chief Minister: Thank you Dato' Speaker, thank you for the supplementary question, Honourable Member for Sungai Pinang. Indeed, what was mentioned as the core values in Keluarga Malaysia, Inclusiveness, Togetherness, Gratitude, we have indeed gone through Wawasan Penang2030, 4 Main Themes and 16 strategic initiatives, and also through policy programmes and initiatives implemented by the state GLCs, have made efforts to achieve this objective so that both Keluarga Malaysia and Penang2030 do not become mere slogans but become a direction for the State of Penang or even Malaysia. We need to measure how far the people understand this concept. We understand that Keluarga Malaysia is a new concept, but for Penang2030 it has already entered its fourth year. I would like to draw the attention of the Honourable Member for Sungai Pinang that recently the Penang Institute announced the results of its study, the Happiness In Penang Index. Indeed, it is something mentioned in Penang2030 as important, that we intend to have a measure of what we implement, and we will implement a Happiness Index as in the advanced Western nations, which have this index to measure the level of satisfaction of the people with what happens around them. It was found, in the study conducted by the Penang Institute, that even during the pandemic, 7.65% of Penang people considered themselves happy and satisfied with issues such as liveability, the green agenda and so on in the State of Penang, which are the core of Penang2030. We may propose that such a study be conducted every year or every two years as planned, so that this measurement is sustained. The findings also enable agencies and the State Government to see whether what they do has an impact and effective results as set, and if not, then a re-evaluation of methods or strategies must be made to change, in order to fulfil the aspirations and wishes and expectations of the people towards the liveability ecosystem and so on, the important issues in recognising the level of happiness among the people.

Speaker (Speaker)

Terima kasih.

Satees A/L MuniandyDAP · PHBagan Dalam

Soalan tambahan.

Speaker (Speaker)

Sila.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you Dato' Speaker, thank you Honourable Chief Minister. The Keluarga Malaysia Concept introduced by the new Prime Minister is a concept that seemingly shows that all Malaysians are in one family. In a family, usually a mother or father will not step-parent, will not treat their children differently in terms of region, race and so on. I want to ask the Honourable Chief Minister, this is about budget allocation, not only for the state, this is The Former Policy Research Director of Khazanah Institute, Dr. Muhammad Abdul Khalid, he said, he has stated: "Malaysia is the only country where its budget is race specific". Total contrary to what we have in Penang. We take care of all communities, Chinese national-type schools, Tamil, Peoples' Religious Schools, National Schools, all are taken care of under this. So what is the stand of the Honourable Chief Minister, will we follow this Keluarga Malaysia concept, which is only rhetoric and also just publicity, not the Keluarga Malaysia that will truly be practised, because in the budget too we see it is very imbalanced where non-Bumiputera only get RM345 million. So is there, what is the view and stand of the Honourable Chief Minister?

Y.A.B. Chief Minister: Yes. Thank you Dato' Speaker, thank you Bagan Dalam. Actually, in answering the question of the Honourable Member for Sungai Pinang, I have already voiced the concern of the parties here about what has happened since the Keluarga Malaysia Concept was introduced. We know that the Honourable Prime Minister suddenly became Prime Minister and suddenly had to release a concept that would reflect his commitment to our country, and suddenly we have the Keluarga Malaysia Concept. So we do not want to dispute the Keluarga Malaysia Concept because this is indeed the aspiration of us all, that Malaysians live in harmony, tolerance, inclusiveness, togetherness, gratitude for what we have in this country, treasures and wealth, happiness and so on. That is a concept we welcome. But as soon as this concept was introduced, not even 100 days, we saw what happened in budget allocations and so on, which may give the perception that the Keluarga Malaysia Concept is not a serious concept but merely a concept for the sake of having a concept, to introduce the new Prime Minister to the country. So this has caused a situation of concern among the people, some people, as to what is actually the objective of Keluarga Malaysia? Is this a continuation of policies based on ethnic considerations or otherwise, in line with the core values of Inclusiveness, Togetherness and Gratitude of Keluarga Malaysia?

Speaker (Speaker)EN

Thank you. Question number 41.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Thank you, Honourable Dato' Speaker. My question is number 41. No. 41. Social Welfare Department (JKM). (a) List the types and locations of existing shelters under the purview of JKM throughout the state. (b) How much allowance has been paid to OKU since 2018 until now? Detail by race and gender. (c) How many applications for assistance have been rejected since 2018 until now and what are the reasons for rejection? Provide statistics by race.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you Dato' Speaker. Thank you to the State Assemblyperson (ADUN) from Permatang Berangan. I would like to answer question number 41. There are two types of shelters operated by the Social Welfare Department (JKM), namely for the target group of rescued children and the target group of women victims of domestic violence. For child cases, there is one child shelter under the purview of JKM in Penang, namely Rumah Kanak-Kanak Taman Bakti at Kepala Batas, North Seberang Perai. RKKTB is a Place of Safety institution for cases of care and protection of children under Section 54 (Place of Safety) and Section 30(1)(d), Child Act 2001 (Act 611). The operation of RKKTB, for cases of women victims of domestic violence, there are two interpretations of shelter according to Section 2, Domestic Violence Act 1994 (Act 521), namely: (i) Place of Safety refers to any house or institution maintained or managed by the government or voluntary organisation approved by the Minister responsible for social welfare; or (ii) Shelter refers to any house, institution or any other suitable place, which is occupied, whose occupants or owners are willing to accept a victim temporarily.

Up to now there are 42 Places of Safety approved by YB. Minister of the Ministry of Women, Family and Community Development (KPWKM), of which 35 are operated by the government and seven (7) by Voluntary Welfare Organisations (NGO) throughout the country. For the State of Penang there are two (2) Places of Safety that have been approved by KPWKM. From 2018 to 2020, the total involved was RM4,563,450.00 for programmes related to its purpose. From 2018 to 2020, a total of 6,870 applications for assistance were rejected because they did not meet the eligibility requirements of the application, this is for OKU and others. The breakdown by race and gender is as in Appendix C which will be placed on the Honourable Member's table after this oral question session. Among the reasons for rejection of applications are as follows: (i) Not a Malaysian citizen. (ii) Family income exceeds the eligibility limit to receive assistance from JKM.

(iii) Has adult children who are working and able to contribute/support the applicant's living; or (iv) Still healthy and able to work and be self-reliant to support one's own/family's living.

Speaker (Speaker)EN

Thank you. Yes?

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Supplementary question. Thank you Honourable Dato' Speaker, thank you Honourable Member for Sungai Puyu for the explanation on question 41. My supplementary question, referring to children who have no parents. If they are not placed under a shelter or care centre by JKM, how does JKM identify the safety of children who are under the care of guardians? Secondly, apart from financial assistance, what other facilities or privileges are provided by JKM to the Persons with Disabilities (OKU) group, and what categories allow OKU or heirs to apply for monthly or one-off allowance assistance. And referring to applications that were rejected, can applications be made again or can any application be made annually or as one-off assistance. Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you. For those who have been rejected, they have the right to make an appeal. Usually we allow them to go directly to the District JKM Office and if there is anything, they can meet with the ADUN to make an appeal. If the ADUN is still dissatisfied, they can also refer to me and I will ask them to send the file and I will conduct a review. And for children who have no parents, usually they are placed in government-approved childcare homes and there they also receive assistance, namely what is called Empower of the Street Citizen. It is a programme that has been launched and there are indeed rates that can be given to them to help the NGO homes that look after those children. And for others, there are indeed certain conditions. Certain conditions such as for assistance for those who work, and if studied they are not more than RM1,200.00, additionally it will be distributed to them because JKM encourages all OKU to work, and those who cannot work such as bedridden OKU and others, we also give monthly assistance. Anyone who cannot work may also be given monthly assistance. And the amounts will be calculated according to family income because here it is supported by a policy called BAES (Bantuan Agenda Ekonomi Saksama). Thank you.

Speaker (Speaker)EN

Thank you. I would like to invite… (disruption).

Lee Khai LoonPKR · PHMachang BubukEN

Supplementary question, on shelters.

Speaker (Speaker)EN

Already been asked enough. Please sit down. I would like to invite 42.

Thank you Dato' Speaker. My question is question 42. No. 42. Explain sustainable development in the context of the Penang 2030 Green Agenda. (a) Developments such as highways, sea reclamation, Bukit Bendera affect and damage the environment. Explain how this development can be considered sustainable development by the State Government of Penang. (b) Sustainable management. Explain the form of management implemented.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you Dato' Speaker. Thank you to the Opposition Leader from KADUN Sungai Dua. The Penang Green Agenda launched by the Penang Green Council is a guide containing strategies and action plans including indicators of sustainable development according to the United Nations Sustainable Development Goals (UNSDGs) in facing global environmental challenges in the future. The UN Sustainable Development Goals consist of aspirations to improve social, environmental and economic well-being of the people. It is the mandate of the elected government, with the support of the people, to decide the best way to continue sustainable development that will benefit the people and the environment in the long term. The Penang Green Agenda 2030 has begun to change the practices and perceptions of the State Government in environmental considerations, especially the issue of climate change and policy formulation across all fields. The transition to greener development will take time and effort by all stakeholders, and will be reviewed and re-evaluated periodically. The State Authority is very committed to efforts to preserve and conserve environmentally sensitive areas through the Land Use Strategic Plan under the Penang Island 2030 Structure Plan. To maintain the balance of development and the interests of land use in the long term, forest areas have been retained as forest zones. Zoning of forest zones directly has strict rules and development guidelines, including taking into account the Environmental Impact Assessment (EIA) if according to the type of development carried out. For permanent forest reserves, activities such as development within permanent forest reserves are not permitted unless with a usage permit as provided under Section 32 National Forestry Act 1984 Act 313. However, this usage permit is only allowed for the types of activities listed under Section 34 of Act 313. At present there has been no gazettement out of permanent forest reserves intended for development carried out by the State Government for these 20 years. The concept of sustainable governance under the Penang 2030 Green Agenda refers to a competent administrative body and sustainability concepts as well as decision-making processes that help achieve sustainable development. The main elements of this sustainable governance include increasing the capacity of civil servants to implement sustainability programmes and increasing the effectiveness of leaders to act on development

sustainable, encouraging the government to make science-based decisions, accountability and transparency, and increasing the readiness capacity of the public to take part in the policy change process.

Thank you Dato' Speaker, my supplementary question on sustainable development. What is meant by sustainable development is development carried out in a planned and continuous manner with the principle of meeting present needs without sacrificing the needs of future generations. Meanwhile, sustainable development is defined as development implemented to avoid depletion of resources and ensure minimum damage to nature. So what I want to ask here, what I am worried about is that during the implementation of projects damage will occur, and what effective action will be taken by the State Government of Penang and implementing agencies besides enforcement, and secondly, will conservation and protection of the environment become the main core in the implementation of projects to be developed such as sea reclamation and so on. Thirdly, various conditions are listed by the EIA of the Department of Environment, sometimes up to 72 conditions, most of which are during implementation, before and after implementation. So what is the action if these conditions are not complied with, as happened at Gurney Drive when sea reclamation was carried out, various problems occurred such as silt accumulation, fishermen unable to carry out activities and so on. So what is the current action, as I am worried that during implementation many problems will occur even though we have complied? So what is the action, thank you.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you, the Honourable Member for Sungai Dua, the Leader of the Opposition. I congratulate Sungai Dua for speaking from his own experience. It is true that Gurney Drive has so many problems arising from the sea reclamation, but that was under the Barisan Nasional administration. I still remember that in 2004, when I sat in the Opposition Leader's seat in this honourable House, I had already shown evidence that I had raised these issues, namely at Tanjung Pinang 1, yes you are very right. Therefore, when the second phase that they wanted to carry out for the first time across Malaysia, the Department of Environment brought in all the directors and experts from all the states....(interruption).

Speaker (Speaker)EN

Honourable Member, answer on behalf of this Government and for this era.

Phee Boon PohDAP · PHSungai PuyuEN

I am now answering.

Speaker (Speaker)EN

The three questions asked have been answered.

Phee Boon PohDAP · PHSungai PuyuEN

I am answering, please be patient a little, Dato' Speaker.

Speaker (Speaker)EN

If you are impatient, then if there is none, I will stop.

Phee Boon PohDAP · PHSungai PuyuEN

But Mr Speaker has taken up my time because I want to use it. I am saying that for the first time, for sea reclamation, we have more than 100 new conditions imposed. How many times, when we are not satisfied with their work management, have we also issued notices to them to stop work? How many times have enforcement teams raided there, not only in relation to sea reclamation but also in relation to not following regulations and using foreign workers who are unregistered and without permits? All of this has been done, and I give the assurance that when they carry out sea reclamation at Tanjung Pinang 2, every single month they must submit a report on work management to all offices. And here we have also set up an administrative committee, namely Ops Lumpuh, chaired by the Honourable Member from Tanjung Bunga and supported by me, to monitor all the conditions that have been approved and agreed. This has been handed over to the members of the Ops Lumpur committee so that when they carry out integrated enforcement, we go down there and check everything carefully. The related laws, where we find they are not in line with the present era, have been reviewed and applications made for approval from the EXCO, and they have been gazetted so that the fines are increased. I can give one more example, the Green Agenda managed by the State Government, such as Pulau Jerejak. The issue of Pulau Jerejak, I know, I believe the Honourable Members from UMNO all know that the land that could be developed was sold to UDA, and there are other stories that I do not want to speak about. I got into the Green Agenda. For the whole of Pulau Jerejak, apart from what was sold by the Barisan Nasional Government to UDA, I applied for permission and managed to gazette Pulau Jerejak as a permanent forest reserve, namely Warta 332, covering 285.4 hectares.

Speaker (Speaker)EN

Honourable Member, summarise.

Phee Boon PohDAP · PHSungai PuyuEN

I have to give an explanation.

Speaker (Speaker)EN

Has the question asked been answered?

Phee Boon PohDAP · PHSungai PuyuEN

It is not finished, if I do not have time to finish.

Speaker (Speaker)EN

Whether it is finished or not is determined by me. Please summarise.

Phee Boon PohDAP · PHSungai PuyuEN

I summarise, I say I want to tell him that if he is not here any more, in later sessions, do not ask the same question again.

Speaker (Speaker)EN

Do not waste time, please summarise.

Phee Boon PohDAP · PHSungai PuyuEN

I also ask Dato' Speaker not to waste my time. I want to answer fully.

Speaker (Speaker)EN

Sungai Puyu, sit down, I want to ask for question 43.

Phee Boon PohDAP · PHSungai Puyu

Tidak patut.

Speaker (Speaker)

Duduk.

Phee Boon PohDAP · PHSungai Puyu

Tidak patut

Speaker (Speaker)EN

Should one follow instructions or not?

Phee Boon PohDAP · PHSungai Puyu

Arahan tetapi...(gangguan).

Speaker (Speaker)EN

Question 43, please. Sungai Puyu, sit down.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

Thank you, Dato' Yang di-Pertua. My question is question 43, No. 43. Government Linked Companies (GLC) (a) What is the role of GLCs and their strategy in the economic development of the State of Penang? (b) List the State Assemblymen and Members of Parliament who hold positions in GLCs and their emoluments.

Honourable Dato' Speaker, thank you to Teluk Bahang for the question given just now. There are 16 companies related to the State Government, namely Government Linked Companies, and information relating to the role and strategy in economic development, the membership of State Assemblymen and Members of Parliament in these GLCs, as well as their emoluments, is as listed in Annex A, which will be placed on the Honourable Member's desk after this oral question session. However, I will read out these 16 companies for immediate information for Teluk Bahang: (i) Penang Science Cluster; (ii) Penang Tech Centre Bhd.; (iii) PYDC Strategies Sdn. Bhd.; (iv) Digital Penang Sdn. Bhd.; (v) George Town World Heritage Incorporated; (vi) Penang Harmony Corporation Sdn. Bhd.; (vii) Penang FC Sdn. Bhd.; (viii) PGC Strategies Sdn. Bhd. (Penang Green Council); (ix) Penang Global Tourism Sdn. Bhd.; (x) PICEB Sdn. Bhd. (Penang Convention & Exhibition Bureau; (xi) PWDC Sdn. Bhd.; (xii) Penang Stem Sdn. Bhd.; (xiii) George Town Conservation & Development Corporation Sdn. Bhd. (GTCDC); (xiv) Invest-In-Penang Berhad; (xv) Penang Halal International Sdn. Bhd.; and (xvi) Penang Infrastructure Corporation Sdn. Bhd. These are the 16 GLCs related to the State Government.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

My supplementary question here is that I see there is no listing of the position of PBA, PDC, Penang Hill Corporation and the State Housing Board, which were mentioned as the new agenda of Penang. Is it involved, is it placed under GLCs or not? And are these corporations or bodies profit-making bodies that are not placed under the list just now? And is it outside of us? We find that the Government, in the budget presentation, shows a decline in collections. Is that why it was removed? Thank you.

Thank you once again, Teluk Bahang. PBA is a company listed on the Bursa Malaysia stock exchange. PDC is a statutory body company, as is Penang Hill Corporation. As for Housing Penang, the State Housing Board is a statutory body, and its status is also that. Thank you.

Thank you, Dato' Chairman, for the supplementary question. Just now, 16 companies under the State Government were presented. I want certainty about these 16 companies: how many companies are service-based and how many are profit-based? That means they must seek profit, so that there is profit. Bukit Bendera must have profit and must have income.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

What kind of question is this? Ask a good question.

Speaker (Speaker)

Habiskan soalan.

What profit is achieved by the companies that give profit back to the State Government, for example Bukit Bendera and so on, which have income? If those that provide services may not have income, so thank you.

Thank you, Sungai Dua. Most of these 16 GLCs are non-profit. However, to answer Sungai Dua's question, which of them are under the Companies Act: those that can engage in commercial life, I will give a report later, but most of them are non-profit.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Please give a little explanation about profit and non-profit?

Speaker (Speaker)

43.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Because there is much misunderstanding about profit and non-profit. A company makes a profit, but the profit is not distributed to shareholders. But they make a profit, and it is not distributed to the Board of Directors. If they make profit, the earnings, and it is not distributed to the Board of Directors, that is non-profit.

Speaker (Speaker)EN

Thank you. Question 44.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Dato' Speaker, my question is number 44.

No. 44. What is the State Government's plan to resolve traffic congestion on several main roads in the Bukit Tengah State Constituency (KADUN), specifically at: (a) Jalan Permatang Tinggi; (b) Jalan Perusahaan Autocity; and (c) the Juru Plus Highway exit, Jalan Kebun Nenas.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Dato' Speaker, and the Honourable Member for Bukit Tengah. As a plan to resolve traffic congestion on the main roads within the Bukit Tengah area, the Public Works Department (JKR) will apply for the following allocations, especially Jalan Permatang Tinggi, which is a Federal Road, and the allocation has already been applied for through the 12th Malaysia Plan (RMKe-12). The widening project of Jalan Permatang Tinggi from the SPS boundary to the Bukit Tengah roundabout will be implemented after obtaining approval from the JKR and also the Economic Planning Unit, Prime Minister's Department. Second, Jalan Perusahaan Auto City is a State Road, and the JKR will make a new application for State Government approval for the proposed road widening in that area. Meanwhile, PDC is carrying out work to widen Jalan Perusahaan into a four-lane two-way road from the Jalan Kebun Nenas junction to Jalan Juru. Jalan Susur Lebuhraya PLUS Juru is under the supervision of the Malaysian Highway Authority (LLM), while Jalan Kebun Nenas is a State Road. So the JKR, together with the LLM, is in discussions to find alternatives for dispersing traffic in this area. There are several proposals, Honourable Member, including contraflow and so on. I chaired a meeting only two weeks ago, if I am not mistaken on 17 November, regarding congestion in this area, and the State Government agreed to request the JKR to appoint consultants to carry out a Traffic Impact Assessment (TIA). After carrying out this TIA, there will be options that we can study and see how we can improve traffic at that intersection, which is indeed very bad.

Besides that, Honourable Member, the Royal Malaysia Police (PDRM) will do its utmost to try to reduce traffic congestion on the roads by placing traffic personnel at places where road users gather, to carry out traffic control especially during peak hours. Apart from traffic control, obstruction summonses are also issued to ensure road users do not park their vehicles at will on main roads, which is the main cause of traffic congestion, especially in the Bukit Tengah area, which is the main route to the Penang Bridge. These actions can to some extent reduce congestion, but the existing road structure is no longer able to accommodate the number of vehicles that increase every year. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Thank you to the Honourable EXCO for answering the question on traffic congestion. The areas I mentioned just now, especially the intersection entering from the Juru exit towards Bukit Tengah, are the main road or artery serving areas from Bukit Tengah, BM and so on, up to the roads to Permatang Tinggi and Machang Bubuk. This problem has been in that area for a long time, and the residents there often make complaints about this problem. So I am very pleased to hear the proposals that have been given just now, especially the proposal to carry out a Traffic Impact Assessment (TIA). I want to ask here, when will this Traffic Impact Assessment be carried out and completed, because I feel this is a problem that needs to be addressed by the government as quickly as possible. Thank you, Honourable Member.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. Considering that the decision was only just made in November and the allocation for this year has already been used up, we will use the allocation for 2022. But the first thing in 2022, the JKR will carry out that appointment. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. The next question, I would like to invite question 45. There is no Air Putih, so the Air Putih question 45 is skipped and we go to question 46. Please.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you, Dato' Yang di-Pertua. My question is question number 46. No. 46. Penang continues to be the focus of foreign investors because of the availability of skilled foreign capital and related facilities.

(a) Many people of Kedah State also choose to work in the private sector in Penang. Please provide an estimate of the number of Kedah State people working in Penang, especially in the private sector.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Thank you, the Honourable Member for Bagan Dalam. I was also waiting for someone to ask a question like this. Information on the number of Kedah State people working in Penang State cannot be obtained, and only the people who migrated to Penang are published by the Department of Statistics Malaysia. From 2014 until 2020, the average number of people who migrated from Kedah to Penang per year was 3,500. This accounts for nearly 10 per cent of the total inward migration to Penang. Of this total, the number involved in the labour force is estimated at 2,000 per year. However, in reality it is estimated to be higher, because many Kedah residents work in Penang but do not settle in Penang and commute daily. According to the analysis of the Penang Institute, migrants from Kedah to Penang showed a decline from 2014 to 2018. Nevertheless, the number of migrants who moved from the northern states of Peninsular Malaysia, namely Kedah, Perak and Perlis, has been fairly stable, at about 7,550 migrants per year. The labour force from this total is estimated at 4,300 people per year for the years 2014 to 2018. However, in 2020, the number of migrants fell by 35 per cent, namely from 6,500 people in 2018 to 4,200 people in 2020. This decline is most likely due to the COVID-19 pandemic, therefore only an estimated 2,500 migrant labourers are estimated for 2020. The estimate of the number of migrants from Kedah State to Penang who are involved in the labour force, as well as the estimate of the number of migrants from the Northern Peninsula, the northern states of Peninsular Malaysia, namely Kedah, Perlis and Perak, to Penang who are involved in the labour force, will be placed on the Honourable Member's desk after the oral question. Thank you.

Speaker (Speaker)

Terima kasih.

Satees A/L MuniandyDAP · PHBagan DalamEN

Supplementary question. Thank you, Dato' Yang di-Pertua, thank you to the Honourable Member for Perai for answering my question just now. This clearly shows that there is indeed migration from Kedah. They come to Penang because employment opportunities or economic opportunities for the people of Kedah are more stable or guaranteed in Penang, compared with Kedah itself. However, since 2020, after the new government took over in Kedah, we are often harassed, supposedly having to pay for land, having to pay for water, even though we are a place that provides employment to the people of Kedah. Is this right? Secondly, now with the policies of the Kedah State Government, which are seen as more extreme, which disturb SJK, Sekolah Jenis Kebangsaan, disturb non-Muslim people and so on. Are there new investments, even though they have a high-tech park in Kulim that is so sophisticated and gets cheap electricity, a competitor to Penang, with a government that is not so pro-investor or pro-business? What are our chances in Penang to attract foreign investors? Even though their high tech is so sophisticated and has many facilities. Are our chances open? Thank you.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Thank you. I think the intention is not that one state must compete with another state. We feel that in Malaysia, all states must be developed. We have no jealousy like the Menteri Besar of Kedah, who is a racist and an extremist. I have said in this House, I have said outside, he is an extremist and a racist. So, returning to the question of Bagan Dalam, I think Bagan Dalam, not Bagan Luar? Bagan Dalam. Okay. So both states are developed, and I think Penang is more developed than Kedah. This does not mean that Kedah cannot develop in terms of land supply and so on. There are restrictions in Penang, and perhaps some companies went to Kedah because of the shortage of land, but there are also companies that went to Kedah and came back to Penang because Kedah does not have an ecosystem like Penang. So, whether I feel that the State Government of Kedah, especially from the PAS Government, is an unstable government that often insults the Penang Government and Penang leaders on water issues and so on. I do not mention the things I have written extensively, but what is important is this, the residents of, what figures I gave are conservative figures, more people from Kedah come to work in Penang. Now that the pandemic has indeed declined, we see more people coming. Penang people and residents have bought houses in Kedah and they commute. So what I have been supplied with is that the conservative figures are higher because employment opportunities are a natural thing, from one country to another, one state to another, this is indeed something common and should be encouraged. We also say thank you to the people of Kedah who come and serve in Penang. But we are not like the PAS state, the PAS Government which often insults non-Muslims. Three Hindu temples were demolished in Alor Setar, Kulim and so on. Thaipusam, the Thaipusam holiday, was abolished in Kedah. This is the tolerance of PAS. So I feel that in answering this question, I feel Penang, we compete, because of land constraints we will compete. We will create other mechanisms so that we attract investment. We have no obstacles to them going to Kedah. We have no obstacles towards the people of Kedah, together we are Malaysians, but I feel the problem that has arisen is that the PAS Government of Kedah is the major obstacle to Malaysian unity or Malaysian solidarity. Thank you.

Speaker (Speaker)EN

I want to invite question 47.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, my question is question number 47. No. 47. What is the number of applications received under the Harapan Loan Scheme since 2020, and what is the total allocation that has been approved? (a) What is the percentage and number of applicants aged below 35 years? (b) State the number of applications by type of business, race and place of business.

Speaker (Speaker)EN

Yes, question 47. Please answer. None? Oh, Batu Lancang. Correct?

This question concerns applications. Thank you, Honourable Batu Lancang. The number of Harapan Loan Scheme applications received each year since 2020, and the total allocation that has been approved. Applications for the Harapan Loan Scheme, or SPH, received since 2020 up to October 2021 total 273 applications, and the loans approved amount to RM1.721 million to 195 entrepreneurs. And if we look, this is the COVID-19 and PKP period, there was a drastic reduction in loans because businesses could not open for some time, so loan applications also decreased compared with previous years. Answering the next question, "What is the percentage and number of applicants aged below 35 years?" The number of borrowers aged below 35 years is 73 persons, with a percentage of 37.4 per cent. For the 195 approved applications by type of business, Honourable Batu Lancang asked for the categories of business type, race and place of business. These are as detailed in Appendix A, which will be placed on the table of the Honourable Member after the oral question session is completed.

Ong Ah TeongDAP · PHBatu LancangEN

Mr Speaker, a supplementary question.

Speaker (Speaker)

Okey.

Ong Ah TeongDAP · PHBatu LancangEN

Thank you, Batu Maung. From the answer just now, a total of 273 applications were received and 195 were approved. My question is whether the State Government will relax the application conditions for those who failed to apply or could not be approved, considering that these small entrepreneurs and traders are indeed in difficulty in the post-COVID-19 period. So, is there any consideration from the State Government?

Thank you, Honourable Batu Lancang. Some applications are incomplete, the documents submitted are incomplete, but if there are any that we can open for appeal, we believe, as the Honourable Batu Lancang mentioned, because of the MCO and COVID-19 many have been affected. They can submit appeals, but most, because the documents are incomplete, I will ask for them to be completed so that such cases can be reviewed again.

Satees A/L MuniandyDAP · PHBagan DalamEN

Supplementary question, thank you Dato' Speaker. Honourable Batu Maung, I would like to ask about this Harapan Loan Scheme. I had raised this issue earlier also in my debate on the company CTOS, which is a Credit Reference Agency, where credit lending companies or motorcycle shops use this CRA CTOS, and when a boy, when he was in school, borrowed RM2,000.00 and could not repay after a few years, his name was blacklisted. When he goes to apply for a loan, the motorcycle shop tells him to pay RM12,000.00. This really happens. So I would like to ask whether for this Harapan Loan Scheme, the Credit Reference check will be done, will the CTOS service be used? If it is used, I propose that we remove CTOS from the CRA and use only CCRIS from Bank Negara. This is my question, Dato' Speaker, thank you.

In the screening of applications, this is indeed used. So what happens is that those who are in arrears for three (3) months will come out, as listed in it. So usually we will contact the applicant and obtain what actually, if that, except now under the new Bank Negara rules, they do not, when we do a search, it is not permitted, we will not get the details. It will only show something like, let us say, if we have arrears, but we will not get the details except for bankruptcy. So for applicants, for example, recently under the PEKA 3.0 Scheme, we call back the applicant to obtain what actually, the details. So if he informs us that it is only because of arrears, we consider it.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Speaker, I would just like to add that if CTOS, Maybank also does not use CTOS, because CTOS is not prudent and they do not do diligence, allowing credit companies or licensed moneylenders to use CTOS to extort money from borrowers. So I hope they do not use CTOS. Thank you.

Ambil maklum

Speaker (Speaker)EN

Thank you, question 48, Machang Bubuk Constituency Member.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you Dato' Speaker, my question is question 48 No. 48. How does the State Government ensure the quantity and quality of care and treatment centre services for senior citizens, just as early childhood education or the hospitality industry is provided in Pulau Pinang? (a) To what extent is the participation of young professionals in geriatric nursing care?

(b) Can geriatric nursing care services be made a career for young people or graduates?

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Question 48 from the Honourable Machang Bubuk regarding care centre services. I have been asked to answer this question. The State Government, through the Social Welfare Department (JKM), as the responsible agency for the registration of care centres under the Care Centres Act 1993 (Act 506) and the Care Centres Regulations 1994, acts as the regulatory agency for the operation of registered care centres run by non-governmental organisations (NGOs) and private operators, to ensure the quality of senior citizen care centre services. The Certificate of Registration is issued by JKM, ensuring that care centre operators comply with the following registration conditions: (i) Registered with the Companies Commission of Malaysia (SSM) or the Registrar of Societies Malaysia (ROS); (ii) Obtain support or approval from three (3) technical agencies, namely the Local Authority, the Town Planning Department and the Licensing Department, the Fire and Rescue Department and the Health Department; and (iii) Meet the minimum standards stipulated under the Care Centres Regulations 1994 for the following aspects: 1. Compliance with the carer-to-resident ratio (a) For senior citizens who are able to care for themselves, the ratio is 1:18; and (b) For bedridden senior citizens, 1:4

2. Recruitment of carers for work (a) Persons with appropriate qualifications or experience; and (b) Attending care and handling training for senior citizens organised by external departments or agencies.

3. Compliance with the resident-to-floor space ratio (a) For senior citizens, the ratio is 3 square metres for each resident.

4. Provision of a balanced menu (a) All food and drinks provided for residents or persons received for care at a care centre must be prepared properly, cleanly and sufficiently to meet the nutritional needs of residents; and (b) The diet scale and food menu to be provided must be approved by the Director-General of Health Malaysia and checked by the Nutrition Officer of the Health Department, and displayed in a place easily visible at the centre.

5. Provision of daily activity programmes (a) Training, treatment, therapy, religious activities and recreational facilities for residents

6. Provision of suitable furniture and equipment facilities

7. Storage and maintenance of records at the care centre, namely (a) Records of employees and residents; (b) Records of visits by authorised officers and officers of other government agencies; (c) Records of fire drills and building evacuation drills conducted by the centre; and (d) Log books for recording activities and events

8. Control of cleanliness and safety inside and outside the care centre (a) Besides that, operators at care centres must ensure that all cooks and carers recruited to work at the centre undergo medical examinations at least once a year.

Any non-compliance with and violation of the established regulations may be subject to enforcement action by the Social Welfare Department, namely written directives, compounds, temporary closure and prosecution.

Speaker (Speaker)

Habis?

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

(a) Geriatric nursing care requires a multidisciplinary team consisting of geriatric specialists, gerontology nurses, physiotherapists and occupational therapists, as well as strong support from the welfare unit. Among the activities held are comprehensive Geriatric Assessment for all new patients, daily functional recovery training, training for family members and carers, and various types of pamphlets for the education of patients, family members and carers. A senior citizen admitted to a hospital care centre, the responsible nurse must ensure that a Comprehensive Geriatric Assessment is carried out within 24 hours of the patient's admission, zero falls incidence and zero pressure sore incidence. At present, in the facilities of the Penang State Health Department, there are only 2 nurses who have a post-basic gerontology nursing qualification and who can provide geriatric nursing care and Comprehensive Geriatric Assessment. To provide comprehensive geriatric nursing care, a person must have: (i) A certificate/diploma/bachelor's degree in nursing; (ii) Registration with the Nurses Board; (iii) A current or valid Annual Practising Certificate; (iv) Clinical experience of at least 2 to 3 years; and (v) A post-basic / postgraduate certificate in gerontology.

Meanwhile, based on a review of information on registered senior citizen care centre operators, some operators and staff of care centres have educational backgrounds at degree and diploma levels in various fields, including nursing, while others only have SPM qualifications. (b) Geriatric nursing care services can be made a career for young people or graduates because there are career opportunities offered. Care and treatment services for senior citizens are currently increasing, given that Malaysia is moving towards an ageing nation by 2030. However, it requires high skills, interest and patience to handle the needs of senior citizens.

Speaker (Speaker)

Panjang lebar.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you Dato' Speaker for my supplementary question. Thank you to the Honourable Pinang Tunggal for explaining this important issue. Yes, just now the Honourable Pinang Tunggal mentioned that in Pulau Pinang there are only two (2) nurses with expertise in this geriatric nursing care, so this is a truly astonishing and shocking figure, because our Pulau Pinang State has so many senior citizens, and we see this is a figure that is too low and insufficient for the needs provided. So, is there any plan by the State Government to ensure that these needs can be met better? My second question is whether there are any efforts to encourage young people to take up geriatric nursing care services as a career. I see that there are many "Jom Kerja" or other career programmes, but this field does not seem to be included to attract young people's interest in entering this field. Thank you.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Dato' Speaker, regarding the qualifications required to be involved in this geriatric nursing care, as I mentioned earlier, certificates, diplomas, degrees registered with the Nurses Board, these matters fall under the purview of the Ministry of Health. I believe the Health Department does promote this field to interested Malaysians, but if possible I... (interruption), if there is a Member of the MMK... (interruption).

Speaker (Speaker)EN

The Member of the MMK who is present is not here, never mind, answer whatever can be answered.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Okay, that is all. For the State Government itself, we do not have any plans for this field because it falls under the Ministry of Health and the State Health Department (JKN) itself... (interruption)..

Speaker (Speaker)EN

No more, I don't understand, is it a new field or an old field? You must do your homework. Okay, next question, Air Itam.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you Dato' Speaker, although my next question has largely been answered by the Honourable EXCO in the winding-up, my question is question 49, thank you.

Speaker (Speaker)EN

Has it already been wound up? The answer has been given in the winding-up, if not, please answer.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you Dato' Speaker. In this post-pandemic period, the State Government prioritises restoring visitor confidence and increasing Penang's exposure as a major responsible tourist destination. Apart from highlighting the Standard Operating Procedures, SOP such as the Accreditation System Programme for post-COVID-19 preparedness and the responsible tourism campaign, the State Government also prioritises the sustainable tourism campaign and activities in nature. Strategies at this level will encourage demand through a branding campaign, increase revenue through a strategic partnership tactical campaign, brand engagement and also industry alignment. Thank you…. (interruption)

Just a short supplementary question.

Speaker (Speaker)

Pelancongan ka?

Regarding this tourism, we want to reopen and so on. However, I would like to ask for some clarification about the new variant case, the Omicron variant, like a transformer, its name is Omicron. So if possible, we must ensure that tourists from abroad who will enter must be dealt with, if possible I request clarification, and if possible we must ensure Omicron does not come to Malaysia. A very dangerous variant, thank you.

Speaker (Speaker)EN

Omicron, Omicron, please.

Yeoh Soon HinDAP · PHPaya TerubongEN

Indeed, the recovery of tourism depends largely on the current COVID-19 situation. There are many plans and many actions to be taken, but due to the constraints from the virus, especially this virus, what is it, Omicron, Omicron is now greatly affecting the plans to be implemented. However, to combat COVID-19, we need action not only from my office, including the Health Office and other offices or agencies. So the State Government will continuously monitor the COVID-19 situation, how to tackle it and at the same time develop tourism and also combat COVID-19. This is a plan or action that involves many parties and must also be carried out cautiously.

Speaker (Speaker)EN

Thank you, I want to invite a question from Bukit Tambun, who asks a question on Sungai Dua, 50.

Goh Choon AikPKR · PHBukit TambunEN

Yes, my question is question number 50. No. 50. Describe the daily capacity of treated water production at the Sungai Dua Water Treatment Plant. (a) Explain the average effective capacity of water each month at the Teluk Bahang, Air Itam and Mengkuang Dams. (b) What is the status of the Sungai Perai Raw Water Distribution Scheme project? (c) Describe the plans to treat raw water from Sungai Perai and Sungai Juru.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you Dato' Speaker, thank you Honourable Bukit Tambun for this matter regarding the Sungai Dua water treatment plant. Don't worry, Leader of the Opposition. Honourable, PBA informs that the daily capacity of treated water production at the Sungai Dua Water Treatment Plant is an average of 950 mld, or million litres per day. The effective capacity of water each month at the Teluk Bahang, Air Itam and Mengkuang Dams is as in the table, which I will provide later, because reading out everything is very detailed. However, I did a little calculation using a calculator to average the Honourable Member's figures for the year 2021 up to October, meaning 10 months. The average effective capacity for Air Itam Dam is 75.13 per cent, for Teluk Bahang 60.28 per cent and for Mengkuang 93.91 per cent. That is on average, but if we look at the latest figures, Air Itam is 92.9 per cent, Teluk Bahang 85.6 per cent and Mengkuang 93.6 per cent. So the effective capacity is very satisfactory, and it is quite sufficient for next year.

(i) The Penang State Government has still not received further feedback regarding the official letter dated 19 October 2020 from the Chief Minister to the Minister of Environment and Water on the application to purchase raw water at a reasonable price; (ii) Secondly, the State Secretary of Penang wrote to the State Secretary of Perak in a letter dated 10 December 2020, offering a raw water price higher than before, or equal to the rate applied in the raw water sale agreement between the State of Pahang and the State of Selangor; (iii) Thirdly, the newly appointed Menteri Besar of Perak informed that the Ministry of Energy and Natural Resources is carrying out a study on the capacity of the Perak River to meet water needs. The Perak State Government noted the options presented by the Penang State Government, such as the higher raw water rate and also the proposal for a joint venture on the Sungai Kerian water treatment plant. The study is expected to be completed on, it should have been completed by now, and after the study is completed, it means there will be options to be considered by the Ministry and also the Perak State Government and the Penang State Government. The State Government was also informed that consultants have been appointed for the Option Assessment and Pre-Design study for the scheme. Honourable Member, lastly, the Penang Water Supply Corporation (PBAPP) informed that the plan to treat raw water from the Perai River and Juru River is through the Perai River Water Supply Scheme, which aims to utilise the Perai River as an additional raw water source for Penang. However, earlier engineering studies showed that raw water from this river may not be safely treated using conventional water treatment technology, due to excessively high pollution. Therefore, this scheme will explore the possibility of using alternative water treatment technology to treat raw water safely. The Juru River cannot be considered as a raw water source because the quality and quantity of its raw water are at an inadequate level. The BKSA also informed that the State Government is looking at the potential of the Perai River as an alternative source of raw water supply to meet the needs of the people in this state. Although the water capacity of the Perai River is unable to meet the people's needs in full, it will become an additional source. Thank you, Honourable Member.

Goh Choon AikPKR · PHBukit TambunEN

Supplementary question, Dato' Speaker. Thank you, Tanjung Bunga. Given that the Perak River raw water conveyance scheme cannot be finalised, can we build the Sungai Kerian water treatment plant? That is the first question. The second question: given that South Seberang Perai, particularly the State Legislative Assembly (DUN) seat of Sungai Acheh, the Taman Seruling Emas area in the DUN seat of Sungai Bakap, and part of the DUN seat of Sungai Jawi, are experiencing low water pressure, does PBA intend to build water tanks to increase water pressure, and also as strategic storage tanks like the Mengkuang Dam, but this is more in the form of water tanks for emergency purposes during the dry season, thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member, for the question. Actually, Honourable Member, we did plan to build a treatment plant at Sungai Kerian, but with the existing water resources it is indeed not sufficient. Sungai Kerian only has sufficient water during the rainy season; during the dry season the water is indeed insufficient, and that is precisely the objective of the water transfer scheme from the Perak River. We actually want to bring water from the Perak River into the Sungai Kerian so that we can draw from it and then build the treatment plant. So in other words, that plan is linked to the raw water conveyance scheme from the Perak River. Nevertheless, PBA does have a contingency plan should the Perak River conveyance scheme be delayed further. Among the contingency plans available is to build a pre-treatment plant for the Perai River, as I mentioned earlier. The Perai River may potentially become an additional raw water source of 136 mld, but the treatment method must be a different method because of the higher pollution. Apart from that, PBA also plans to build the Mengkuang water treatment plant at Mengkuang Dam to supply water to SPU and SPT, and this will also directly increase the supply to SPS. So, apart from the two options just mentioned, PBA will also build 3 treated water reservoirs of 45 mld each at Tok Kangar. This will directly increase treated water storage capacity and will stabilise the water supply in SPS, as the Honourable Member mentioned earlier, thank you.

H’ng Mooi LyeDAP · PHJawiEN

Supplementary question. First, regarding the water treatment plant at Sungai Dua. Since we often receive or obtain news about water pollution in Sungai Dua raised by certain parties, especially from the NGO Cintai Alam association, what actions and initiatives will PBA take in future regarding the residues after treatment?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. I think the Honourable Member means the residues from the treatment plant, is that right?

H’ng Mooi LyeDAP · PHJawi

Ya..ya..betul.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, this is actually an issue that also requires cooperation from the Federal Government, and PBA, through the State Government, has written several times to inform the Ministry that, well, there is a need to amend the Act so that these residues are not classified as scheduled waste. It is indeed a problem because disposing of scheduled waste has specific methods, and not every place is one where we can send it. So it has indeed become a problem, but PBA has also planned and taken steps to acquire land next to the treatment plant so that we can perhaps carry out a treatment process and also recycling of the waste, the residues from the treatment plant, thank you, Honourable Member.

Speaker (Speaker)EN

Thank you, Honourable Member, and fellow Honourable Members. The one-hour-and-thirty-minute oral question session has ended in accordance with the Standing Orders of the State Legislative Assembly, so I invite the Most Honourable.

Y.A.B. Chief Minister: Honourable Dato' Speaker, the answers to the oral questions that have been answered just now will be placed on the tables of the Members who asked them and will be included in the Official Report.

Speaker (Speaker)EN

Thank you, Most Honourable. Honourable Members, we now move to the winding-up session on the Bills and the Supply Motion. I would like to invite Honourable Members who wish to wind up, please.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker… (interruption)

Speaker (Speaker)EN

Likewise, the Honourable Member has already answered in the oral question session, so it can be avoided.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, I understand, Dato' Speaker. Any questions that were raised in my oral questions, I will, er, set aside. Okay, Dato' Speaker, first of all I would like to take this opportunity to record my highest congratulations to the Most Honourable Chief Minister on the tabling of the Supply Bill and the Development Estimates Motion for the Year 2022 on Friday last week, under the theme "Mempercepat Pencapaian Penang2030" or "Accelerating Penang2030". The State Government is clearly committed to efforts to revive the economic sector after the COVID-19 pandemic. The allocations to be channelled to infrastructure projects, flood mitigation, and public transport in the State of Penang next year are hoped to help and drive sustainable growth and reduce the negative impact on our state's economy.

Dato' Speaker, I begin with the Honourable Member for Bertam, who raised several issues concerning the construction of the road project from two (2) lanes to four (4) lanes from Permatang Pak Elong to Jambatan Merdeka. For the Honourable Member's information, the contractor is now in the process of removing the plastic barriers from the areas that have been completed, namely the roadside curb installation. As for the location at Jalan Permatang Manggis, the process of marking the road lines is being carried out on site and is expected to be completed within one week before it is opened to road users. Regarding the traffic light timing at the Permatang Sintok junction, the time period has been coordinated to 40 seconds in one cycle, or 40 seconds in one cycle. As for the issue of lighting, lighting along the entire alignment, the design of this road includes the installation of street lights at every junction with traffic lights, in addition to one-to-one replacement in existing areas that have street lights. Temporary route changes occur from time to time as the construction process is still being carried out on site, Honourable Member.… (interruption)

Khaliq Mehtab bin Mohd IshaqBERSATU · PHBertamEN

The Honourable Member apologises.

Zairil Khir JohariDAP · PHTanjong Bunga

Okey.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

Just one question. I raised it in my debate. The new drains built along the road widening, if we look at them, were built with a large deep capacity. Okay, to also accommodate heavy rainfall. Because we know that area is one that is easily hit by flash floods. So the problem now is that when we look at these new drains, they are already covered with sand and wild grass, so in some places, almost half of the drain is already filled with sand. So if these drains are not cleaned, the concern is that when there is prolonged heavy rain, water will still overflow. So I request that the State Government look into this problem. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. I will inform the project team from the Public Works Department (JKR) Malaysia who are currently managing the project, and I will request, if possible, that they take action to clear the sediment. The Honourable Member for Bukit Tengah raised several issues, but I think they have already been answered in the oral question session. The Honourable Member for Bayan Lepas applied for the upgrading of Federal Route FT006 from Teluk Kumbar to Puspakom, in addition to raising the problem of traffic congestion at Sungai Batu. I think the Honourable Member, every time in the State Legislative Assembly (DUN), has brought up that application, but as the Honourable Member also knows, this is a Federal Road. However, JKR has applied through the Eleventh Malaysia Plan (RMKe-11) and the Twelfth Malaysia Plan (RMKe-12), but so far it has not yet succeeded. But we will try again. Honourable Member, do not worry. Regarding the congestion at Sungai Batu, one of the causes is also the existing traffic lights. So I will ask the Penang Island City Council (MBPP) to review whether the traffic light phasing can be optimised further, in addition to which, with the help of the police and so on, we will try, but the Honourable Member is aware that the area is indeed very severely congested at peak traffic hours. The Honourable Member for Jawi raised the matter of plans for… (interruption)

Azrul Mahathir Bin AzizAMANAH · PHBayan Lepas

Dato’ Speaker.

Zairil Khir JohariDAP · PHTanjong Bunga

Sila.

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

Thank you, Honourable EXCO Member, for answering the question. Indeed, every time at the State Legislative Assembly sitting, I raise the same matter, but what is most important, I request, we know we are in a different government situation, so it is indeed difficult to obtain a very large allocation. However, at the same time, I request an interim solution, a temporary reaction, as the Honourable EXCO Member just mentioned, there is traffic control and so on, but this has not actually happened. It has happened, but not permanently. That is why in my debate, I request that if the Royal Malaysia Police (PDRM) does not have enough manpower, we request that traffic wardens and so on through the Penang Island City Council (MBPP) be provided, and be stationed permanently, at least there should be two (2) people, one at Lexis at that junction, and one more at the Sungai Batu junction. And as for the problem of setting the traffic light timing and so on, I do not see a solution; it will still have to be handled manually. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, thank you, Honourable Member. Okay, I will forward it to MBPP, provided they can have sufficient staff, and if possible send traffic wardens. The Honourable Member for Jawi raised the plan to build a road linking FT001 at the Jawi toll interchange to Batu Kawan Industrial Park 2, or BKIP 2. For the Honourable Member's information, this project has already been applied for in the RMKe-12 project list under the title Projek Membina dan Menaiktaraf Jalan dari Laluan Persekutuan FT001 di Jawi Ke Persimpangan bertingkat Jambatan Kedua Pulau Pinang (Project to Build and Upgrade the Road from Federal Route FT001 at Jawi to the Second Penang Bridge Interchange). Apart from that, there is also a plan by NCIA to link the new highway, namely the Northern Corridor Highway, from Serdang to Bandar Cassia, Batu Kawan via FT001 and BKIP 2 in the future.

To elaborate further on the arguments of the Honourable Member for Jawi regarding infrastructure at BKIP 2 and also Byram, PDC will build a road and bridge across the Sungai Tengah that will link Batu Kawan with BKIP 2. PDC will also provide other basic infrastructure such as extensions of water and electricity supply to the BKIP 2 area, including the construction of a centralised sewage treatment plant and the installation of fibre cable. A drainage system study, EIA, TIA and also SIA will be carried out. The EIA and TIA have already been carried out. The SIA is currently being carried out to assess the impact of development on the existing environment. The upgrading project will be implemented in accordance with the findings of the approved studies.

Mr Speaker (Dato' Speaker), I refer to the matters raised by the Honourable Member for Bukit Tambun. Among them are traffic congestion on Jalan Bukit Tambun, Jalan Batu Kawan, Jalan Perusahaan Valdor and the Federal Road, as well as the defects on Jalan Perusahaan Valdor and Jambatan Batu Kawan. In addition, the Honourable Member also raised the issue of the connecting road or missing link between Jalan Tasek Mutiara 10 and Jalan Hijauan 1. For the Honourable Member's knowledge, the Public Works Department (JKR) has appointed surveyors to carry out boundary survey work for the proposed widening of the left-turn lane from Jalan FT001 to Jalan Perusahaan Valdor. At the same time, the project to upgrade that junction has already been included in RMKe-12 for approval at the Ministry level. Regarding the Jambatan Batu Kawan, the current progress status is 69%. As the Honourable Member himself is aware, this project was supposed to be completed already, but there was a delay caused by the collapse of the second pier. The geotechnical consultant appointed from Kuala Lumpur has investigated and found that the cause of the incident was the construction of a temporary working platform. The contractor has been held responsible for the repair works, and the new completion date is May 2023. Meanwhile, for the Jambatan Valdor project, the progress status is 95 per cent and it is expected to be completed in the second quarter of 2022. For the extension of Jalan Valdor, premix work is being carried out and is expected to be completed in early 2022.

Regarding the missing link between Bandar Tasek Mutiara and Hijauan Hills, in fact, the Honourable Member, this matter has been brought to the attention of the State Government, and a decision has already been made at the State Executive Council (MMK) level to impose a condition on the developer, Tetuan Palmington Sdn Bhd, to build the 380-metre road, namely the missing link, whenever any Planning Permission Plan (PKM) application is made for any project in and also around the Bandar Tasek Mutiara area. So, as soon as the PKM comes in, it will be required to build that road.

Mr Speaker (Dato' Speaker), the Honourable Member for Seberang Jaya raised several issues on traffic congestion. For the information of the Honourable Member for Seberang Jaya, the Seberang Jaya Roundabout is a State Road that was upgraded from two (2) lanes to three (3) lanes in 2018. However, this roundabout no longer has sufficient ROW for widening to four (4) lanes. As for Jalan Permatang Pauh, which was complained about by the Honourable Member for Seberang Jaya, it is in fact Federal Road FT3111, and JKR has already escalated the application for widening this road to the Ministry level. Perhaps the Honourable Member for Seberang Jaya is not here, but he may have good relations with the Federal Government, so perhaps he can request the widening. Yes. Perhaps it can succeed.

The Honourable Member for Sungai Acheh has raised the problem of road congestion in the Sungai Acheh area. For the Honourable Member's information, the traffic congestion on the Federal Road from Simpang Ampat to Simpang Sembilan is caused by the existing road capacity having reached saturation level and being unable to accommodate the volume of vehicles, especially during peak hours. Traffic lights at the junctions along the Federal Road function as traffic control and provide facilities for road users to make turns. The following improvement proposals can be implemented to improve the smoothness of traffic flow on the Federal Road, namely widening the road to increase road capacity, closing the operation of traffic lights at several junctions along the Federal Road, and upgrading junctions to grade-separated interchanges. However, the closure of traffic lights can only be considered once JKR is able to provide U-turns at suitable locations to give convenience to road users.

Mr Speaker (Dato' Speaker), before I move on to issues related to flood mitigation, I would like to take this opportunity to inform you that during this debate I have heard and observed much praise by the Honourable Members for the Penang State Drainage and Irrigation Department (JPS). So I too would like to take this opportunity to record my immense gratitude to the entire JPS Penang State team, led by Engineer Zainuddin and his team, Deputy Director Ooi, all the JDs, and also an officer who has just been transferred to Perak State, who managed all the high-impact projects in Penang State from the beginning until the end, namely Encik Yogen, who has been promoted to JD in Perak. So the State Government is truly indebted to all these officers who have worked tirelessly to contain the flood problem in Penang State. However, I used the word "contain", and whether it resolves the problem is another matter, Honourable Member, because you too must understand that when we discuss this flood issue, there is no one hundred per cent solution. The most we can do is to cope with rainfall up to certain levels; if rain is extremely heavy, exceeding the design level, it will certainly flood too. I hope the Honourable Member can understand this. Okay.

Mr Speaker (Dato' Speaker), regarding this matter, the Honourable Member for Sungai Dua has asked for a list of flood mitigation projects by the State Government and the Federal Government. This list is rather long, so I will give it to the Honourable Member for Sungai Dua in writing.

The Honourable Member for Permatang Berangan raised the issue of flash floods in the areas of Simpang Tiga, Pokok Machang, Pokok Tampang and Taman Desa Ara Permai, Ara Kuda. For the information of the Honourable Member, the village drainage system in Simpang Tiga, Pokok Machang and Pokok Tampang is located on privately owned land and requires the landowner's permission for repair works to be carried out. For the drains involved, MPKK and also the residents are in the process of obtaining written permission from the landowners. However, the administration constantly monitors and immediately carries out repairs in areas where permission has already been given by the landowners. As an example, in 2021, the State Government carried out drain repair works at Kampung Chegar and Kampung Banggul in the Permatang Berangan State Assembly seat (KADUN), at a repair cost of RM130 thousand. For Taman Desa Ara Permai, the developer is in the process of resolving the flood problem by upgrading the existing drainage system as well as constructing a diversion drain to fully resolve the issue concerned. Among the upgrading scope is the construction of a 3.6-metre monsoon drain in front of the housing estate. The current status is that the developer is in the process of obtaining approval from JKR for the construction of a diversion drain crossing Jalan Ara Kuda. In addition, improvement works on the existing retention pond are also being carried out on site.

Mr Speaker (Dato' Speaker), the Honourable Member for Batu Lancang raised the issue of Solok Van Praagh. It is my pleasure to inform that the tender for the project was advertised on 17 November and the site visit was held on 24 November. The closing date for the advertisement is scheduled for 23 December and the appointment of the contractor is expected to be made in mid-February 2022. The Honourable Member for Batu Lancang also raised the matter of the monsoon drain under Jalan Kurau that is poorly maintained due to unclear jurisdiction issues. Regarding this issue, JPS will arrange a meeting with MBPP to find the best solution.

The Honourable Member for Jawi has touched on... (interruption). Please.

Ong Ah TeongDAP · PHBatu LancangEN

Mr Speaker (Dato' Speaker), sorry, regarding the question about the structural strength of the monsoon drain under Jalan Kurau, because a meeting was held between us and MBPP together with JPS. But at the most recent meeting together with the District Office, JPS refused, saying it is not under their scope. And they passed it back to MBPP. So, it's a case of being passed back and forth. So, it cannot be resolved. So, now I request JPS to, not maintenance, but to investigate the structural strength of the monsoon drain on Jalan Kurau, because a collapse occurred at Solok Perak and also a collapse occurred in 2005 on Jalan Kurau as well. I am afraid it will recur as it did at Solok Perak. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Alright. Thank you, Honourable Member, I will direct the relevant departments to investigate the structural strength of the structure. So that we ensure the structure, the structural integrity, is still in a safe condition. The Honourable Member for Jawi has touched on the problem of infrastructure at BKIP 2 in Byram. For the Honourable Member's information, the entire development of BKIP 2 involves an area of 1,327 acres. The land filling work currently underway involves the development of the first phase, namely an area of 100 acres. The construction of infrastructure such as high-capacity pump houses and a proper drainage system with sufficient capacity is very important to ensure sustainable development and to avoid problems in the future. This proposal has been conveyed by JPS to the project promoter, PDC, through a series of workshops and written comments. This is an important requirement, especially because the Byram area is a flood plain in South Seberang Perai.

The Honourable Member for Jawi also raised the matter of Sungai Jawi. For your information, JPS, through the State Government's allocation, has prepared the Flood Mitigation and Environmentally Friendly Drainage System Master Plan Study, namely the Drainage Master Plan for SPS, which was completed in 2017. Through this comprehensive and thorough study, it is estimated that RM835 million is required for the cost of flood control infrastructure development across the whole of SPS. The estimated cost for the development of Sungai Jawi is RM383 million. Because it involves a high cost, JPS has planned the development in stages based on priority. For Sungai Jawi, JPS has applied for an allocation from the Federal Government of RM70 million for the proposal to upgrade Sungai Jawi in RMKe-12, but the application was rejected. Considering its importance and urgent needs, JPS will re-submit the proposal for this project in Rolling Plan 3 under RMKe-12. With reference to the approval of allocation to raise the riverbank level of Sungai Jawi that was newly approved by the State Government, JPS will study the proposals recommended by the Honourable Member. The works will be implemented based on the amount of allocation received and other technical requirements. The narrow river, steep riverbank slopes and limited river reserve are among the main challenges in drafting proposals for upgrading works in this area. However, JPS will do its utmost to deliver the best service for the welfare of the residents in this area.

Mr Speaker (Dato' Speaker), with reference to the RTB Teluk Kumbar Project, the Honourable Member for Bayan Lepas requested the State Government to make early planning for the coming phases, including the construction of retention ponds, upgrading of existing drains and rivers, and planning for land acquisition. For the Honourable Member's information, the RTB Teluk Kumbar Project currently being implemented has been designed to provide protection up to 20 ARI and is expected to be completed at the end of this year. After that, JPS will carry out an outcome assessment of the project. Based on that assessment, JPS will redraft the proposal for the second phase project, which will provide protection of 50 ARI, followed by an application for allocation. Among the proposed work components in the second phase project are the construction of flood retention ponds, building embankments, and of course land acquisition will be involved.

The Honourable Member for Bukit Tambun raised the problem of the box culvert structure at Sungai Kechil opposite the Nibong Tebal Paper Mill. For the Honourable Member's information, the main cause of the overflow of Sungai Kechil in the area is due to the small size of the culvert structure, or culvert. JPS has taken a proactive action by prioritising the proposal to replace the culvert with a new bridge under RTB Sungai Kechil. The proposed upgrade is still at the detailed design stage and the tender advertisement is scheduled for 2022. So, this is another major RTB in the SPS area.

The Honourable Member for Bukit Tambun also raised the issue of flooding at Kampung Sepulau, Kampung Sethu, as well as the junction of Jalan Changkat and the Federal Road. As the Honourable Member is aware, the flooding at Kampung Sethu and the junction of Jalan Changkat - Jalan Persekutuan is caused by the overflow of Sungai Jawi when the catchment area receives a high amount of rainfall. This situation is worsened when there are obstructions to the flow of Sungai Jawi by the Federal Road and State Road bridge structures that were built too low. For long-term planning to reduce flood risk in the area, JPS has applied for an allocation from the Federal Government of RM70 million for the proposal to upgrade Sungai Jawi under RMKe-12. However, this application was rejected. But it will be re-applied for, Honourable Member. As for Kampung Sethu, JPS's records show that this area is the most frequently flooded area in SPS. Development in the surrounding areas of Kampung Sethu has made it the lowest-level area. Therefore, apart from structural measures to reduce the flood risk in this area, perhaps an alternative solution that can be considered is to carry out resettlement.

But that is also not easy. But sometimes we see in other countries, when there is a flood plain, resettlement is one method to solve the problem.

The flooding at Kampung Sepulau, on the other hand, is related to Sungai Junjung, which forms the boundary between South Seberang Perai and Central Seberang Perai. Sungai Junjung also receives runoff from the hilly catchment area in Kedah State, which causes the water flow to become swift with a large volume when heavy rain occurs. A narrow river and the absence of embankments often cause river overflow, which in turn results in flooding. As a solution, JPS has put forward the project proposal for the Sungai Junjung Corridor Rehabilitation Plan under RMKe-12, amounting to RM85 million. The short-term initiative to reduce flood risk in the area is by constructing temporary embankments at critical areas and river maintenance works, ensuring that every obstruction is cleared immediately.

The Honourable Member for Bukit Tengah raised the issue of flooding at Kampung Dock. It is my pleasure to inform that the State Government has already approved an allocation to carry out survey work to determine the scope of upgrading works at Kampung Dock.

Mr Speaker (Dato' Speaker), I now move on to PTMP... (interruption).

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Honourable Zairil, Honourable Member. Briefly. Yes, yes.

Zairil Khir JohariDAP · PHTanjong BungaEN

Please, Honourable Member.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Thank you. Regarding Kampung Dock, earlier we heard that there have been many efforts before this, and our work in appreciating the Department of Irrigation and Drainage (JPS), but today I also want to take this opportunity. I understand that the announcement earlier about the level survey of the drainage flow for Kampung Dock and also Kampung Tok Panjang has been approved. I want to record my appreciation also to the District Office, the ADO, who has already taken the initiative to make a visit and also proposals to MMK. This is one matter that I want to say. Second, regarding what was mentioned earlier about Sungai Junjung, long-term planning and so on. I want to raise the issue once again regarding the climate crisis, which will certainly be in the long term, from 2050 until the end of this century, 2100. We will see the effect where the amount of rain that will fall in the areas of Penang and Malaysia will increase. And this can result in more rain and also floods. Although it is not the specific issue that was raised earlier, I hope perhaps the Honourable Member can give a suggestion on what we will do to tackle the long-term problem, because if we do not do it now, when we are later struck by heavy rain, which will definitely increase in the future, these floods will result in huge losses and huge expenditure for the government later. So, specifically, my question is whether we will carry out a risk track assessment regarding this climate crisis. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Bukit Tengah. In fact, the issue raised by the Honourable Member for Bukit Tengah is an issue that needs attention not only by the State of Penang but the whole of Malaysia and the whole world, as a result of the climate change that is currently happening. Therefore, for the State Government of Penang, we have established a Resilient Infrastructure Taskforce chaired by myself, with Think City as the secretariat. To look at the actions that can be taken and planned for the future, specifically to tackle this climate change problem. So, this matter is also under the attention of the State Government, thank you. Honourable Dato' Speaker, the PTMP and PSR projects have already been identified by the Penang State Socioeconomic Recovery Consultative Council (PSERCC) as among the main drivers of economic recovery in the post-COVID-19 era. Regarding this project, the Honourable Machang Bubuk has asked a question about ESG criteria. However, I think my oral question has already covered it, Honourable Dato' Speaker. So, I will move on to the next question. Honourable Machang Bubuk, although you have already raised the matter of green financing during oral questions as well, I want to add a little more information here. During the oral question, I did not have time. For the Honourable Member's information, green financing encourages and supports financial flows and related services towards the implementation of development, business models, investment, trade, economy, social projects, and environmentally friendly and sustainable or viable policies. The State Government believes that green financing can be used to finance the PTMP project. In fact, for the Honourable Member's information, I myself was invited to make a presentation on the PSR project at the 6th OECD Forum on Green Finance and Investment, which was held in Paris, France in 2019. This was before the COVID era, Dato' Speaker. Basically, the PSR project received a good response at that international conference, among industry players and international financial institutions. In fact, the State Government has succeeded in attracting the interest of the Asian Development Bank to provide green financing for the LRT project. However, as the Honourable Member is aware, any financing, including green financing, that the State Government wishes to receive depends on the consent and approval of the Federal Government. Unfortunately, after the change of Government occurred in early 2020, among the decisions made by the new government was to cancel the financing of the LRT project by the Asian Development Bank. So, unfortunately, after the change, earlier, the previous Minister of Finance had given a lot of help in terms of approvals, the previous Prime Minister also gave approval for Penang to receive financing from the Asian Development Bank. But unfortunately it was withdrawn by the new Minister of Finance. Once again, it seems Penang has been made a victim. Although the financing, we are not asking for money from the Federal Government at all, Dato' Speaker. We ask from international financial institutions. What we ask from the Federal Government is only approval, and even that can be withdrawn. Once given, it can be withdrawn. This is what can be done, Dato' Speaker. Perhaps the Honourable Seberang Jaya can help a little... (interruption).

Lee Chun KitDAP · PHPulau TikusEN

Excuse me for a moment, please. Thank you, Honourable Tanjung Bunga. I feel very disappointed if the Federal Government seems not to support the State of Penang in the development and progress of our state. So, therefore, I hope that here, our friends from the Opposition may be able to bring this to the Federal Government. Because their loyalty should be to the State of Penang and not elsewhere, like the State of Kedah. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, I agree with the Honourable Pulau Tikus.

Lee Khai LoonPKR · PHMachang BubukEN

Request for clarification. Thank you, Tanjung Bunga, who has reminded the House that we actually received approval to obtain a loan or grant. What I want to know about this Asian Development Bank (ADB) is, what reasons were given by the Federal Government that the loan or grant that would finance this LRT project was rejected. And what reasons were given by the Federal Government. Why was it rejected. Someone wanted to give a grant or give a loan, why did we reject it. Were those conditions not favourable to us.

Zairil Khir JohariDAP · PHTanjong BungaEN

I think that question should be directed to the Ministry of Finance, Honourable. I would find it difficult to answer. But what I know is that we have indeed received a letter from the Ministry of Finance which cancelled the financing. Regarding the question of the Honourable Machang Bubuk also on the allocation that has been given to the Penang Infrastructure Corporation since its establishment on 9 July 2020 until the end of November 2021, the State Government has given an allocation amounting to RM13,871,845.90 million. However, the allocated cost has not been fully used. This is because the manpower required at PIC has not yet been fully filled, since the PTMP and PSR projects have not yet physically started. So, this allocation includes the costs of company establishment, purchase of office equipment, office space rental, emoluments, salaries and so on. Dato' Speaker, in answering the question of the Honourable Seberang Jaya regarding the preservation and conservation of the environment, I am pleased to inform that the development of PSR will be implemented in line with the regulations and guidelines that have been set by the relevant departments. During the implementation stage, the State Government will ensure compliance with the control and mitigation measures proposed in all approved reports. Among them are water quality monitoring, air quality monitoring, vibration and noise monitoring, solid waste management, disposal of excavation materials, and also the installation of silt curtains (silt curtain) or and the installation of online monitoring equipment for water quality. In addition, a Third Party Environmental Audit will also be carried out periodically during the construction stage to ensure effectiveness and compliance with the stipulated conditions. Besides that, the development of PSR also includes green initiatives to protect the environment, among them the provision of 20% of the land of Pulau A for

the creation of public parks, water canals, wetlands, floodplains and also bioswales to enhance biodiversity and prevent floods, and planting mangrove trees on land of 20 acres to create new habitats and nursery areas for fish and prawns. Mangrove trees are good carbon absorbers and can also help overcome global warming. The State Government has also proposed long-term control measures including implementing ecological balance programmes such as mangrove planting, placement of artificial reefs and sinking of structures, release of fish and prawn seeds, construction of friendly shorelines (shoreline) on the perimeter of the PSR island to encourage biodiversity, growth of micro habitats and eco-tourism, and the provision of funds for research on marine ecology, fisheries, turtles, reefs and others. Thank you to the Honourable Seberang Jaya for continuing to give support to the PTMP and PSR projects. In answer to the Honourable Member's question, the State Government and implementing partner, the SRS Consortium, are addressing the technical issues that have arisen in the implementation of PTMP and PSR, especially the issue of the approval of the EIA Report for the PSR project that was cancelled. The State Government is now in the final process of applying for judicial review of the decision of the Appeals Board. In addition, the State Government will also update the EIA Report and resubmit it, as I have mentioned during the oral question, Honourable Member. As the Honourable Seberang Jaya stated, this project has taken a lot of time and cost. Because PSR is important for the economy and the future of the people of Penang, the State Government will still continue efforts to obtain the approvals needed to begin the project. The State Government also guarantees that until all approvals are obtained, this project will not be started. Dato' Speaker, the State of Penang is indeed a pioneer in efforts to encourage the use of public transport among the people. Oh, please.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Tanjung Bunga, for the commitment given to continue this PSR project. But among the matters I raised, when we refer to the Budget Speech of the Honourable Chief Minister, the first PTMP, the Penang LRT project, is linked together with the PSR project, because according to what was prepared by the State Government, the Project Transport Masterplan's depot is on the island that is to be built. That is why I raised in my debate that if this is linked together, then you jeopardise the whole project, the State Government's planning, including in terms of solving the traffic congestion problem and creating better public transportation. Does the State Government intend to separate these two (2) projects so that approval for PTMP also does not have its own problems? So, when it is linked with another bigger problem, namely PSR, I am afraid that because PSR does not pass, the State Government will immediately decide to cancel the project too... (interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Honourable. Honourable Seberang Jaya, I want to make a small correction. That "jeopardise the whole project" refers to the Federal Government, not the State Government of Penang. That is a fact that needs to be corrected. Thank you.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Honourable. I think we are here to discuss facts. Jeopardise in the sense that EIA has been submitted. It's in the process. It's a deal process. We respect the process. Whatever decision is made later by the State Government. I am discussing this from the strategy aspect. This means that if PTMP is viewed separately from PSR, then perhaps the depot alignment may need to be relocated so that we can start the first PTMP. Because if, I think the Project Transport Masterplan is supported by everyone. I think the ADUNs here also support it. Including the Opposition ADUNs. Only the PSR issue indeed has differing views. Even the Government ADUN does not support PSR, the Government Members of Parliament also do not support PSR. So I do not believe, I do not know, perhaps some EXCO members say they support it, but in their hearts they do not support it, perhaps there are... (interruption).

Speaker (Speaker)

Pendekkan.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I am not sure. So that is why I mentioned earlier, this is my concern, the PTMP Project. ... (interruption).

Speaker (Speaker)

Jelas dah.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Which I hope, if possible, the State Government will consider separating these two projects so that PTMP can be implemented first, Honourable.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Seberang Jaya. The State Government takes note, and as I have said earlier during the oral question session, the State Government does have plans and is studying whether we can call for an RFP next year, which will include options where, if PSR does not become a financing model, other financing models may be considered. So this is among the fallback plans. But the State Government is indeed confident, Honourable, confident that all compliance has been done, all conditions imposed have been complied with, and the State Government is confident that the EIA Report that will be given to the Department of Environment will be approved once again, Honourable. Do not forget, the previous EIA was not rejected, it was approved. It is only that on technical grounds, which the State Government certainly did not agree with, the approval was set aside. This does not mean there is a problem with the EIA, Honourable. So we are confident that the issue raised in the Appeals Board's decision has been resolved. PSR has already been gazetted in the State Structure Plan. So the same issue no longer arises. So we are confident, this time we can get approval and can begin work without problems.

Speaker (Speaker)EN

Honourable, the Honourable Member's reminder is five minutes remaining.

Zairil Khir JohariDAP · PHTanjong BungaEN

Whoa, 5 minutes. Okay, then. I will make an important announcement. Honourable Dato' Speaker, the State Government of Penang is indeed keen to encourage the use of public transport among the people. Yes, from long ago we started with the Central Area Transit (CAT) service in George Town. It is a free bus in George Town, and then the BEST, or Bridge Express Shuttle Transit, was introduced, which is still running after many years, where we also operate free buses from the mainland to the island. And last year the State Government took a major step by implementing a free bus initiative across the entire State of Penang through full funding of Pas Mutiara. This means that every Malaysian citizen who has a Pas Mutiara can enjoy free travel using Rapid Penang buses on every route and at every time in this state. There is no other state, I do not know if there is any other state in the whole world, Honourable Dato' Speaker, where the use of public buses is free for everyone. And I am pleased to inform the House that the State Government has agreed to continue the financing of this Pas Mutiara for next year. Although Penang was not included among the states that benefited from My50 in the Budget 2022 announcement by the Federal Government, the State Government remains committed to helping ease the burden of the people. However, the allocation for next year is limited to a maximum of 7,500 customers per month. But I think this is not a big problem if we compare it with November, when customers were only around 7,000. Nearly 7,000 customers. So the limit we have set of 7,500 customers per month, I think, can benefit many public bus users in this state. Although this amount is slightly less compared to the current year, it is hoped that it can encourage the use of the public transport system. Besides bus subsidies, the State Government has also introduced free ferries for all Malaysian citizens starting 1 July 2021, limited to 65,000 tickets a month. I am pleased to inform that the free ferry programme will be continued for 2022 as well. So Honourable Members all, there is no other state in Malaysia where all public transport is free. Free buses, and free ferries too. I think this is truly Penang leads lah. Sungai Acheh, do you want to speak?

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

I thank the Honourable EXCO for presenting the matter regarding free buses across the entire State of Penang. But it is very regrettable that the Rapid Bus in the Sungai Acheh area has been cancelled, and it is very important for users including school students in the Sungai Acheh area. Indeed, this matter has been raised before, that the cancellation, although the reason given was that it was not profitable, I ask for the consideration or goodwill of the EXCO and also the State Government to reinstate free Rapid buses at least during school hours in the morning and when returning home. Because this area of Sungai Acheh, as we know, is on the periphery of the State of Penang, and we ask that in the privileges given to other places, it not be marginalised. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Sungai Acheh. Your request will be forwarded to Rapid Penang. Okay, Honourable KOMTAR has put forward a proposal that the Hino buses currently on trial by Rapid Penang be provided with seats. For your information, the Hino bus is a trial bus under a collaboration between Rapid Penang and Hino Motors. The proposal that seats be provided will also be forwarded to Rapid. Honourable KOMTAR also proposed that the State Government discuss with the Federal Government to obtain 100 electric buses. The State Government does agree with this one, because this is what we have been asking for all along, but the final decision rests with the Ministry and also with Prasarana. Honourable Pengkalan Kota raised the issue of the ferry timetable. For your information, Honourable, Penang Port Sdn Bhd (PPSB) has issued a new travel schedule that began on 20 November, where the frequency during peak hours is 30 minutes while during off-peak hours it is one hour. Honourable also recommended that ferry services start earlier, before 7.00 a.m., so that more passengers such as students and workers can use the ferry service. The State Government agrees and will discuss these proposals with PPSB so that the ferry service can be improved. Okay, Dato' Speaker, to conclude, since this is my last issue, I would like to say a little about digital initiatives. To ensure that the state of Penang is ready for the digital era, the State Government has established a new agency, Digital Penang, which is responsible for drawing up the direction of digital development in four (4) critical sectors, namely digital infrastructure, digital economy, digital governance and also digital community. Since its establishment in April 2020, Digital Penang has already drafted the Digital Transformation Master Plan, which covers short-, medium- and long-term plans. Within just 18 months since its establishment, Digital Penang has succeeded in implementing various initiatives and programmes, among them the DahDigital campaign that Honourable Batu Maung mentioned, Go Digital Go International. In addition, Digital Penang has also organised several series of e-commerce workshops and published the book Funder's Grit, as well as facilitated the provision of a Special Financial Aid of RM 1,000 to 961 PKS or Small and Medium Enterprises for the use of digital applications. Furthermore, Digital Penang has set up the Coffee and Curry Puff community as a knowledge-sharing forum and to connect technology startup companies. A total of 13 webinars have been held with the participation of 1,584 technology entrepreneurs and technopreneurs. The Alpha Startups Digital Accelerator was also organised in collaboration with a private company, 1,337 or Leeds, as a bootcamp for 11 local startup companies. A fintech hackathon was also successfully arranged with the company Finexus, which attracted the participation of 34 teams from across Malaysia. Additionally, Digital Penang has identified an area in George Town to be developed as the Creative Digital District (CD2), which we call CD2 Square, that will become a digital hub for technology companies as well as a learning centre and test bed for strategic initiatives such as the Smart City of Excellence and also the 5G Sandbox. Most recently, Digital Penang has signed a Memorandum of Understanding (MoU) with AngkasaX and USM to develop the aerospace engineering subsector in Penang. Under the MoU, AngkasaX will set up an Assembly, Integration and Testing (AIT) facility at USM for the development of Low-Earth Orbit (LEO) satellites. In terms of digital infrastructure, Digital Penang is following up on the proposal to establish an Internet Exchange as well as a data centre in Penang. These facilities are extremely important for improving the quality of internet connectivity services in this state. Furthermore, Digital Penang is also exploring the possibility of establishing an integrated geospatial database to digitise the application and monitoring process for underground utilities. With such a system in place, it will facilitate the development planning process throughout the state.

Finally, Digital Penang is also in the process of evaluating tenders for the Digital Integrated Service Centre (DISC) project. This is very important because it will be the application to be used at every Service Centre of the State Assemblypersons of Penang. The system will enable the Service Centres to register customers digitally and to connect various State Government applications such as iSejahtera and e-Rumah, as well as to track and follow up cases in progress. This project can help to cultivate a culture of digital work, where information management can be overseen more efficiently and in a more orderly manner. In addition, it will also reduce manual management by Service Centre officers, and this will help them provide more efficient and value-added services. So in future, when people come to our Service Centres, we will ask them to insert their IC into the machine, and all the data will come out. We can see their history of receiving mySejahtera, their history of receiving any assistance, and we can also see whether any complaints have been lodged by that person, and whether those complaints have been resolved or not. So this will help digitise the services of the State Assemblypersons in Penang. So, Honourable Dato' Speaker, do I still have time?

Speaker of the State Legislative AssemblyEN

No.

Member for Tanjung Bunga (YB. Zairil Khir Johari): Enough? Okay, so to conclude, Dato' Speaker, the State Government is very committed to ensuring that infrastructure and transportation development is carried out using the most efficient and sustainable methods for the well-being of the people of Penang. Therefore, the State Government hopes that all parties, including government departments and agencies, the private sector, the Federal Government and also the people of this state, can cooperate and always support every State Government initiative to develop and advance the State of Penang towards achieving the vision and mission of Penang2030. Thank you. I humbly request to support.

Speaker of the State Legislative AssemblyEN

Thank you, Tanjong Bunga. Next, Sungai Puyu, don't you want to? Is Sungai Puyu still sulking, perhaps?

Phee Boon PoohDAP · PHSungai PuyuEN

No, he has obtained the permission of the Chief Minister to wind up first.

Speaker of the State Legislative AssemblyEN

I did not sit down earlier because I was sulking. Datok Keramat, you are invited to proceed in your own time, yes.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Dato' Speaker. It is hoped that in my speech, Sungai Puyu can be a little calmer. So, I would like to take this opportunity this morning to answer several questions, as advised by Dato' Speaker, I have taken note. I will not try to repeat anything that I have stated in the oral questions addressed to me. I move on to my first portfolio, Dato' Speaker, which is this morning's PlanMalaysia in Penang, or previously known as the Town and Rural Planning Department (JPBD), Jabatan Perancangan Bandar dan Desa. So, I think there is one question that has been consistently raised by many YBs, namely I have seen it from Honourable Pengkalan Kota, Honourable Air Itam, Honourable Jawi, Honourable Bayan Lepas, concerning the construction of foreign worker dormitories. Dato' Speaker, I think this is a very clear issue so I will address it quickly. For the information of all, Dato' Speaker, we have a policy to ensure there are areas for foreign workers to be accommodated in a controlled manner throughout the State of Penang. This is a policy that had already begun before COVID-19, before the pandemic, it is just for your information to put the perspective in place. But after the pandemic, Dato' Speaker, it seems it has become more necessary, why? Because the fact is that most cases come from foreign workers from factories, which are our main clusters. This cannot be denied, it is a fact. So we have several programmes that we have already started, and we want to ensure that the provision of more specific, safe, systematic and conducive worker accommodation is in line with a guideline that we have established, Dato' Speaker, namely the Guidelines for Planning the Construction of Worker Accommodation in the State of Penang, which is also based on the legal provisions, namely Section 24H, the Workers' Minimum Standards of Housing and Amenities (Amendment) Act 2019, we call it Act 446, Dato' Speaker. Where this Act of course has standards that we must ensure are complied with, because they are also human beings, and we must ensure that there are standards that are applied, because one of the factors is that many of our factories in Penang are multinational companies or MNCs that need to ensure that their workers live in conducive conditions, and our laws and guidelines based on and anchored in that legislation do indeed look at these international standards, Dato' Speaker. Apart from that, Dato' Speaker, there are various questions when we want to establish a worker dormitory in a certain place, there may be social impacts. But I would like to stress here that, among other things, a Social Impact Assessment (SIA) report is required from all developers, and this study will identify the impact on the surrounding community and see whether mitigation measures need to be taken, Dato' Speaker. Therefore, Dato' Speaker, we are of the view that not only the guidelines but also the existing legal provisions are sufficient to address the issue of the spread of COVID-19, especially at the present time among foreign workers, and therefore

we will continue with our efforts. Before the pandemic, to inform my colleagues in the House, two schemes had actually already been developed, one here in the island, namely in Batu Maung, and one on the mainland side, namely in Bukit Minyak, and the current status, Dato' Speaker, is that we have 10 schemes already completed, as I mentioned, two of which have 9,542 beds, which means for 9,542 residents, Dato' Speaker, and under construction and also in planning, 8 other schemes will be built which will have 64,118 beds for occupants, where the total for these 10 schemes, Dato' Speaker, is for 73,660 occupants.

Here on the island and also on the mainland side, and what is important, Dato' Speaker, I want to state, I will move on to a very important matter. At the National Council for Local Government meeting recently concluded this year, where we, I represented the State Government, which was chaired by the Prime Minister himself, and of course Dato Seri Rizal was there, the Minister of KPKT, we discussed this issue because this issue is not a Penang issue, it is a national issue. When the pandemic struck, we saw that the clusters came from factories, foreign workers. Unfortunately, I do not blame them, they are also human beings, but the fact is that is how it is. So, in principle we agree that there needs to be worker dormitories, but the issue is this, Dato' Speaker, the pandemic does not wait, but to build a dormitory we have to wait three years, four years to build one building. That's the problem. So in this last meeting, Penang through me, I said we also need an approach or solution for the short term and medium term. Yes, worker dormitories, as I mentioned just now in the background, we have ten, but we cannot wait for three years. So we have proposals, several proposals from all states in Malaysia, in fact, and among the proposals, Dato' Speaker, we want short term and medium term, so two things are very important. So, first, to place our workers in factory areas that are suitable, that means large enough, and secondly, of course, in commercial areas if they are not close to a Housing Scheme. That is the whole point, if you try to get them out of housing schemes, so that they do not affect, it will not have an impact on the local population. And for the information of Dato' Speaker, this has been agreed by all states in Malaysia, but I want to tell you one thing, there is a proposal from the Ministry that these short-term and medium-term worker accommodations also be permitted in residential areas, and I personally do not agree, and when that happens I see that most states in Malaysia also do not agree with the Central Government. So they take lessons from the state of Penang, so we are moving forward, Dato' Speaker. In fact, for temporary permits for worker accommodation, this is for the short term and the medium term I am talking about just now, several have already been approved, many also in the Penang City Council and also the Seberang Perai City Council, and we will continue this effort because this is important for the short term and medium term while we wait for the longer-term dormitories to be built, and that one will take time. Already ready, we will try to assist and expedite the process. Both the mayors, both Datok Bandar, have already been asked, because this has become a very important issue for public safety and our health. Please.

Gooi Hsiao LeungPKR · PHBukit TengahEN

Thank you, Honourable Member. Honourable Member, regarding the issue of foreign worker accommodation, it is extremely serious, as raised by the Honourable Member himself. Many of these foreign workers' accommodation places have already become COVID-19 clusters before this, and my area is not spared, where my area is a large industrial area and many of these foreign workers are placed not in dormitories but in residential premises, and for this short-term problem, which I have previously proposed that more enforcement be carried out, because

in my view, Honourable Member certainly knows that under Act 446, the Workers' Minimum Standards of Housing and Amenities Act, every employer, I mean employers, must obtain a Accommodation Certificate. Accommodation Certificates for housing their workers in residential premises, including, and I think there is no enforcement to ensure this is done. Earlier I asked in my question to state the number of surprise enforcement inspections, spot-checks under this Act, Honourable Member, in my area, on worker accommodation units in the DUN Bukit Tengah area throughout 2021, and the answer given, of course I know this is under the Labour Department, it's under them, where it was stated here that there were only four (4) integrated operations and these operations were also carried out in manufacturing areas and construction sites. It's not enough to inspect the factories and construction sites. They have to go down to the residential estates, Honourable Member, to check whether they have the Accommodation Certificate, and I hope the Honourable Member can take this issue seriously to press the relevant departments such as the Labour Department to carry out more spot-checks at these places. Thank you.

Terima kasih kepada Bukit Tengah, soalan yang begitu penting sekali. Dato’ Speaker, apabila kita mula sebelum pandemik pun, pre-pandemic, apabila kita datang dengan satu pendekatan untuk ada asrama pekerja, ingin saya nyatakan, ia bermula dengan senario di mana ada banyak aduan daripada skim-skim perumahan akan ada banyak warga asing di dalam skim-skim mereka. Contoh I bagilah, I ingat saya telah pun nyatakan but just to give a background to your answer, your question is very important. Di Batu Maung pada tahun 2017, kita ambil tindakan kerana di bawah undang-undang, di dalam sesuatu rumah itu sekiranya ada lebih daripada sebilangan orang kita boleh ambil tindakan. Ada peruntukan perundangan dan telah diambil. Cuma saya didatangi oleh apa ni pengusaha factory dan sebagainya. Dia cakap, okey, you have won the case. Ada perintah untuk keluar, untuk beri vacant possession, tapi kita nak pi mana. So they went to the adjacent scheme, that was the reason why we have to think about how to solve this problem and that is the reason while pre-pandemic, kita telah putus ada asrama pekerja. I agreed with Bukit Tengah. Yes, kita perlu ada lebih tindakan pengkuatkuasaan sekarang juga especially in your area that’s the reason why in near your area Bukit Minyak, we have one (1) because we already identified that is the hot spot. You know Taman Nagasari, everyone here knows, I openly can say it. Dato’ Speaker also probably will know. I mean this is majority is warga asing they even thinking may be convert the whole thing but there are legal issues if we can buy over and convert the whole thing faster also but this are legal issues also we are looking into, but I agree with your sugestion. But let me tell you the problem, the problem is kita telah daripada Lembaga Perumahan Negeri mohon kerjasama daripada Jabatan Tenaga Kerja (JTK) untuk dapat senarai nama daripada semua pengusaha kerana actually kilang-kilang perlu maklum dia punya pekerja siapa, dia duduk di mana, so that information cannot come to us, they go to JTK and Lembaga Perumahan has already asked so that we can get that information. And once we do, then we can see which agency is the right agency untuk ambil tindakan penguatkuasaan tersebut, dan saya beri commitment kita sedang in fact soalan yang baik kerana sedang dilakukan and of course saya ingin pergi kepada rakan saya daripada Bayan Lepas, I think, yang selalu ada buat pertanyaan tentang isu asrama pekerja and kita selalu akurlah kepada pandangan semua Ahli Dewan Undangan Negeri. Ini yang terpenting, itulah satu kerajaan yang telus yang mendengar and yes, there are 1 or 2 cases yang telah pun dinyatakan terlalu ramai di situ. I won’t go into the lots and all that I think, ini yang

dirujuk oleh rakan saya di mana memang dalam Mesyuarat Jawatankuasa Perancang Negeri telah dibangkit dan kita sendiri telah pun mengambil tindakan untuk bincang sama ada kita boleh kurangkan number pastikan semua syarat-syarat dipatuhi, I think, one of the other issue of course is berkenaan trafik dan sebagainya tapi itu semua adalah syarat yang diperlukan so jangan risau sememangnya kita akan lihat pada itu, and saya ingin juga beri komitmen di sini bahawasanya atau pun beri penjelasan bahawasanya kita tak hendak letak semua pekerja asing di satu tempat sahaja.

Kita hendak letak mereka di semua tempat yang memerlukan penempatan pekerja iaitu di bahagian-bahagian kilang dan sebagainya dan bukan satu tempat sahaja ada kilang di Pulau Pinang. Pulau Pinang satu tempat industri kilang yang pesat sekali di seluruh Malaysia so kita ada banyak tempat so perancangan kita bukan di satu tempat saja. Ia di tempat yang berlainan, let me just allay your fears, Bayan Lepas. Seolahnya kita semua hendak datang ke Bayan Lepas, No, that is not the right thinglah, but we will take into consideration. Kita akan ambil pertimbangan apa yg dinyatakan dan in fact for your information, that particular project that you mentioned, we have already reduced it, the number was not 40000. Dalam speech Bayan Lepas dinyatakan 40000, I think from the information I got, it will only 30000 but even than we have reduced it now to 25000. And it’s a very big area, it is a self-sustaining area, the whole idea, Dato’ Speaker, kita hendak pastikan mereka boleh berada dalam satu tempat di mana mereka berdaya huni sendiri tak perlu keluar, that was the whole idea because mereka dulu dalam skim-skim perumahan ada masalah sosial so when we have such new asrama pekerja our syarat is very detail begitu terperinci sekali, sehingga banyak kemudahan perlu diadakan dalam kemudahan atau pun asrama pekerja itu. Any question from Bayan Lepas?

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you to Honourable EXCO for commenting on my speech or my objection to the proposal to build a foreign workers' hostel in Teluk Kumbar. I spoke on the basis of what I have received. These 40,000 people are not a project that is within my knowledge, Honourable EXCO. You said just now that 25,000 is only the Zantalite project on Lots 1435 and 1437, right? The others still exist: Lots 1859 and 1865 in Taman Perda, and another one at Sungai Batu. All of them exist, and the information has already been conveyed to Honourable EXCO and to the Honourable Chief Minister himself. And if we listen to what Honourable EXCO just said, that there have been discussions between states and so on, wanting this settlement not to take place in areas close to local residents, that is what I have heard. So among the problems we opposed there is that when Zantalite wants to proceed, it takes in the coastal reserve where fishermen land their boats, and they want 70 boats, 80 boats there. That is one. Second, the proposal to take over land for an access road from State Government land, state land, which I have also suggested Lot 244 be made into a buffer for building RMM houses. And third, we there are worried about a large volume, 25,000 people in one settlement. That is only the first one. The second one, on Chong Co. land, is right in the middle of the Taman Perda community, and there is another at Sungai Batu. We are worried, first of all, that the infrastructure is not there. Right now in Teluk Kumbar, the police station is small, with only a few people. We do not want to be like Batu Maung the other day during the PKP, where just a few thousand people, 4,000 people, and "bebaskan, bebaskan, bebaskan" protests already happened. Imagine if there were 25,000 people; the 29-storey consulate building could collapse, that is what we think. This is for the future, and our facilities are still lacking too. There is no fire station, the fire brigade has to go to Kampung Terang, Balik Pulau, which is far, or Bayan Baru. There is no clinic either, so these are the things we think about for the community there.

And another thing we must remember is that when there is a large settlement of thousands of people there, there are another 8,700 within less than 2 km. Another 1 km, another 2 km, another 11,700. So, we, the original residents there, the indigenous people there, who bought property there, will worry that the value of our property will fall. Who will buy?

Speaker (Speaker)EN

Okay, it has been long, and the debate has also been lengthy and wide-ranging.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Bayan Lepas. Indeed, you are so enthusiastic in saying "bebaskan, bebaskan". I want to free the people of Penang from the problem in our housing scheme, because that is the problem now. Therefore, we have workers' hostels so that we can place them in a controlled manner in one place. Otherwise, that is the social problem that started almost 10 years ago in my office, and up until now, and with the pandemic, 70 per cent of those infected with COVID-19 are foreign nationals from factories, whether they want to or not, living in our housing scheme areas. I don't think so. Do not say that in these workers' hostel schemes there are no facilities; there certainly are. There are clinics, there are ATMs, they can send money home to any country they come from without going to our banks. Moreover, the conditions now are very strict. There are even hairdressers. Honourable Member can go there to get a haircut. No problem. You can check whether they are free or not. No problem. But don't ever say that we are doing this not humanitarianly, because that is wrong. That is why the international standards that we have accepted in national legal provisions, first of all, and in our state guidelines, because it is a requirement by our MNCs. I don't want to repeat, but this is the fact. 1 minute, 1 minute.

Speaker (Speaker)EN

The hostel, we don't need to go into it, now we don't have time…. (interruption).

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

One more.. one more.. one more question. I want to ask, okay, now there is an SIA underway, and the consultants have even met me personally, and I have stated what is right and what is wrong, all of it. MPKK and what the residents all say. So, will the State Government still proceed, or if the SIA receives a report that is truly transparent and so on, saying this cannot be done, or if there is opposition with various reasons that these conditions are not permitted, will the State Government still carry it out?

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Certainly, that is the requirement, Bayan Lepas. All projects, not just workers' hostels, have conditions that must be complied with. All reports must be submitted: the SIA (Social Impact Assessment Report), the TIA (Transport Impact Assessment Report), all of them must be given to us. If the consultant says it cannot be done, then if there is a mitigation plan, the developer must comply. If they cannot comply, then when it comes to us, we will reject it. Certainly, this is the condition, Bayan Lepas. Okay, I move on, Mr Speaker.

Speaker (Speaker)

Ya.

Thank you. I think for me on Plan Malaysia that’s the most important because everybody seems to very confuse about the position, in fact we are trying to assist everyone here. Saya pergi kepada perumahan dan perumahan of course dekat pada hati saya tapi saya ingat pada hari pertama saya telah sentuh banyak perkara saya tak mahu sentuh lagi number number tentang pembekalan semua saya dah sentuh, penyelenggaraan saya sudah sentuh, cuma saya hendak tanya dua perkara tentang dua isu ini, pembekalan kita telah sampai 126,816 unit, pelbagai unit 42,000 to 300,000. Dato’ Speaker, I made a check because just to update I don’t want to repeat much, ada banyak negeri yang sekarang saya dapat maklumat yang sudah pun tidak ada Rumah Mampu Milik seperti kita jenis A, low cost Dato’ Speaker this is 42,000. I got a report here from my Lembaga several state, 1,2,3,4,5,6 at least the RMM A sekarang sudah pun naik daripada 42,000, ada yang naik juga kepada 90,000. This is RMM A, RMM B ada yang sudah tak ada pun they straight to RMM C kita masih ada so i think this is the important thing I want to raise to all my friend here because we are still maintaining the price very important something that Penang will continue to do, it is not easy because of course no developer wants to do this and that’s why I come to my next questions, next point Dato’ Speaker kepada Permatang Berangan yang atas dia tanya satu soalan baik how can we have more rumah Rumah Mampu Milik jenis A dan B for Low Cost and Low Medium Cost? I give the answer very quickly. Untuk makluman semua, apabila sesuatu pemaju itu tak dapat membina Rumah Mampu Milik A dan B dan mereka perlu dalam mana-mana pembinaan dia disyaratkan secara peruntungan, peruntukan, perundangan which is RSN, Rancangan Struktur Negeri mempunyai kuasa perundangan dan mereka perlulah we know 30% LC, LMC depending on the area sometimes dia punya area is too small so they cannot build, so apabila dia tak boleh build apa yang berlaku mereka perlu bayar sumbangan. So itu akan diakaunkan di bawah Akaun Amanah pelbagai kita. Untuk makluman Dato’ Speaker, setakat 31 Disember 2020 last year, end of last year my report that I have is kita ada baki akaun di situ RM216.86 juta as a result of bayaran sumbangan and the question by my learned friend from Permatang Berangan of course, how can we provide more Low Cost, Low Medium Cost? Jawapan dia senang. Dengan apa yang kita ada dana ini dalam akaun ini sekarang of course di bawah Lembaga Perumahan dulu daripada Jabatan Perumahan, kita akan membuat berbagai perkara saya beri sekarang itu something new just to informed everyone kita akan membiayai pembelian dan pengambilan balik tanah dengan tujuan untuk apa Permatang Berangan kata, mendirikan unit-unit rumah kos rendah dan kos sederhana rendah. Kita akan juga membiayai pembangunan baru atau pun pembangunan semula rumah kos rendah dan kos sederhana rendah, kita akan membangunkan tapak dengan menyediakan infrastruktur yang diperlukan di kawasan perumahan yang dikenal pasti dengan of course yang penting selain daripada itu kita juga akan memberi insentif dan sebagainya kepada kontraktor-kontraktor yang hendak bantu kita dalam usaha kita untuk pembekalan lebih perumahan RMM A dan B sepertimana disarankan oleh Permatang Berangan yang saya setuju, I fully agreed with you but this is the kaedah yang kita perlu guna and we hope you know, we are just beginning I will cometo a few more points because I want to give a perspective inilah satu dana yang kita ada not much

dana we have in fact kita perlu lebih untuk bina satu-satu blok perumahan RMM, now we have Lembaga we are waiting start building our own in my lisan answer Bukit Gedung I mentioned, Mahsuri mentioned we know it is the minimum GDV of 150 millions. Easy to build one blok, so if 200 millions one block that’s it yang penting ingin saya nyatakan dengan Lembaga Perumahan apabila kita bina projek pertama kita di Bukit Gedung, projek pertama kita di Mahsuri saya yakin dan percaya akan ada pulangan baik kepada Negeri Pulau Pinang yang akan jawab lagi soalan Pematang Berangan RM216 juta itu akan meningkat. So it is a live number and we continuously try to assist by building, like I said in my answer lisan we want to prioritize Low Cost, Low Medium Cost in Lembaga Perumahan. Silakan Bagan Dalam.

Satees a/l MuniandyDAP · PHBagan DalamEN

Mr Speaker, may I have the floor? Thank you to the Honourable Datok Keramat, who has given an answer on the state's commitment to providing housing. Housing is a basic right, as we always proclaim. Honourable Datok Keramat, I agree our prices are still low compared with the whole country. In Kuala Lumpur, or at the national average, RM100,000 is affordable. In Penang, we have RM42,000 and also RM72,500, which is very affordable, but there are also developers who take advantage in the building of low-cost housing. I have just received this information; if not, I would have raised it earlier. One low-cost flat project at Taman Pasir Indah, in the area of my friend Permatang Pasir, was indeed a low-cost housing project that should have been sold to Malaysians at RM42,500, but it has now been found to have been changed into a foreign workers' hostel. Is this within the knowledge of the State Government, and does the developer, who has already obtained approval to build low-cost flats, suddenly change it into a foreign workers' hostel? That is my question.

Thank you very much Yang Berhormat Bagan Dalam. Well, this is a important question of course first of all I wanted to answer Permatang Berangan dengan apakah usaha kita and I hope some answer is there I take your question after I answered Bagan Dalam. First of all untuk kos rendah, kos sederhana rendah dalam borang PN1 apabila kita pohon untuk beli tidak dibenarkan untuk disewa simple as that bukan pada pekerja asing, kita punya orang tempatan pun you tak boleh sewa it has to be owner occupied yang perlu dihuni pemilik very simple, isu is perundangan now and I said this many times and I think you all tired of listening to me say it again but let me give you one development, Kementerian baru, Menteri baru Datuk Seri Reezal apabila dia masuk, dia datang panggil saya sendiri, dia tanya apa isu penting and I told him this is one of the biggest issues because ada penyalahgunaan perumahan kos rendah, kos sederhana rendah tapi kita tak boleh buat apa saya telah nyatakan dahulu ialah satu isu perundangan Jadual G, Jadual H dalam Akta yang berkenaan dia tidak membezakan antara perumahan kos rendah dan kos sederhana rendah dan kos biasa, so kalau saya beli rumah kos biasa sememangnya saya ada hak untuk sewa, everybody know that and that’s yours right but in law they don’t differentiate. Jadi saya bagitau Reezal please we have to look into this dan dia setuju and I want to thanks Federal Goverment dia setuju untuk adakan bengkel dan kita ada bengkel dulu tapi saya sudah mengharungi atau pun melalui 4 Menteri sekarang sejak saya jadi EXCO Perumahan, so I have to advice and repeat the same thing always this problem with turnover high turn over on your side that’s problem. So Reezal said as soon as possible bengkel will be held we look into it for sure of course this particulars case Pasir Indah been turned in to hostel pekerja we might be the only one like I said you don’t have to go far walk down the road go to Macallum, you can see.

Satees a/l MuniandyDAP · PHBagan DalamEN

Actually, Honourable Member, it is not the buyer who changed it into a workers' hostel. The developer himself refused to sell it to the people of Penang, and said the original approval was for low-cost flats. Now, once it has been built, he has gained an opportunity to change it into a foreign workers' hostel. They want to turn it into a foreign workers' hostel. This is unfair to the people of Penang.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

If the approval was for low cost, then it certainly must be low cost…(interruption). If there is permission, but if he got permission, we will check, but definitely no.

Satees a/l MuniandyDAP · PHBagan DalamEN

I bring this to the attention of the Honourable Member, who can take action…

I will check there is no such things on your own whim and fancy just changing the plan because we have to abide a plan by both City Councils so we can see unless we have been some application subsequent to it yang mereka pohon untuk ada dipinda perancangan tersebut tapi I will check this is your Pasir Indah. I will check Pasir Indah, Dato’ Speaker I will go on, anything from Permatang Berangan?

Nor Hafizah binti OthmanUMNO · BNPermatang BeranganEN

May I interject. Thank you, Honourable Mr Speaker, and thank you, Honourable Datok Keramat, for the explanation on the issues of RMM A and RMM B, particularly for the Tasek Gelugor area. I only wish to request the kind assistance of Datok Keramat. As in the question answered a few days ago, Datok Keramat promised to hand over in writing the conditions that allow housing developers not to supply RMM A and RMM B houses, and I have not yet received that answer in writing. So perhaps the office of the Honourable Member can prepare it so that I can give an answer to the residents of Permatang Berangan. Thank you.

Okey,yhank you very much. Secara am sekiranya orang pemaju tu tidak dapat sediakan secara fizikal maka sumbangan perlu dibuat persoalannya ialah apakah, what’s other condition, keadaan yang kita boleh ambil kira untuk lulus atau pun tidak permohonan dia untuk tidak bina. So secara lazim dia tak boleh kalau dia kita boleh pertimbangkan kalau dia punya tapak itu kecil especially on the island sometimes on the island, Dato' Speaker when you want to build you got 1, 2 acres memang dalam tapak itu you tak boleh bina but let me tell you one thing di Pulau kita on island di mana kes-kes sebegitu rupa berlaku. Kita sekarang last result adalah untuk terima sumbangan kita boleh bagi syarat okey kalau you tak boleh dibina atas tapak bina tapak lain, so

they will go to other places sometimes Balik Pulau some area di some land they can build it there so we get them to build it because that’s their responsibility itu tanggungjawab mereka.

Thank you. Only about the problem that has arisen in Tasek Gelugor. I see there are small projects, I understand that if the land of the project is small, less than 150, perhaps we can consider not building RMM A and B houses. But I see two (2) projects, three (3) projects where the land is large, the number reaching 2,000, more than 1,000. Why not, if we do not allow them to build only C houses but they build A and B together? That is one. Second, on the issue of the Trust Account: I heard just now that there is RM216 million in developers' contributions to the account. I feel this account should be used to build, I ask for an explanation, we build, we build low-cost houses, or the purpose is related to low-cost matters, low cost, or A and B. So, it is possible, I would say, if we have land to build low-cost houses A and B, can the Housing Board consider using this trust account to build houses? We have land, my land, I can look for in Tasek Gelugor, but we build A and B houses. Thank you.

Speaker (Speaker)EN

Thank you. I only want to remind you that there are only 10 minutes left of the balance.

Thank you, thank you, terima kasih kepada Dato’ Sungai Dua atas itu iaitu boleh bagi tanah. Okey very important because at the end of the day the first important cause is land tapi saya gembira pada pagi ini rakyat Pulau Pinang dapat lagi satu komitmen daripada Sungai Dua, Of course Reezal has already committed dua PPR, satu di sini, satu di seberang. And today if you can commit mungkin saya nak tanya mana tempat dia? Maklum kepada Lembaga and then kita akan ambil, we will take the next step.

Speaker (Speaker)

Esok lulus.

Esok lulus? Hari ini boleh lulus. Lepas lunch. With that RM216? Of course, but you give me that but of course that’s the whole point now that tabung, because it is coming back to account. It is there for us to develop on our own, but it is not easy for us to develop but kita dah sampai masa dia. Sebelum ini Jabatan Perumahan tak boleh buat tapi sekarang Lembaga Perumahan melalui enakmen peruntukan undang-undang, kita akan buat. That is the reason why I mentioned, day 1, Bukit Gedong mentioned Mahsuri. We are doing it ourselves. So let us know if you have the land, easier for us. Itu satu cadangan yang terbaik pada pagi ini. Thank you very much.

Dato’ Speaker, I’ve only 10 minutes more, I will very more quickly not to touch on anything else but for perumahan, satu perkara yang begitu penting adalah di Pulau Pinang, kita ada kekangan dari segi tanah and then you know, it is not easy while we wait untuk penambakan lebih dilakukan dan sebagainya. Itu akan ambil masa 10-20 tahun, tak tau pun kita ada di sini atau tidaklah. So, we have to act quickly. Our children, they’re growing up fast. Your children, their grandchildren, all growing up very fast, so they need houses, roof over their heads. I’ve always said perumahan adalah satu hak asasi, so we have to provide and get ready. So how? Yes, we can, you know in Penang, we were very strict, we don’t want to go ti the 76-meter dan lebih, tak boleh. Which means we can’t ever go to our hills. Which is good. This will maintain. We will never ever allow that not to happen or to happen, never. We will maintain but then we had to look then where do we go? Penambakan will takes time. So, yang terpenting adalah satu kaedah baru iaitu pembaharuan semula bandar. Kita ada banyak bangunan, I’ve said this before, just want to put on record of few details Dato’, di mana kita telah pun mulakan perbincangan ini, lama sudah. I think we were the first state to comes out with The Urban Regeneration Committee (URC) under at that time Jabatan Perumahan. And in fact, Pusat to keep on their shoulder as well but as I’ve said, due to the high turnover Ministers, I’ve to brief Reezal again tentang ini kerana sudah berhenti tiba-tiba kerana banyak menteri masuk keluar dan sebagainya. So, the issue is also perundangan but in Penang kita akan teruskan walaupun ada isu perundangan, kita ada kaedah kita tersendiri di mana kita lihat, pada sesuatu tempat itu, kalau kita boleh dapat buy in iaitu persetujuan daripada penduduk, then kita boleh move. But that is the issue because if you don’t get the buy in by the certain percentage, then we cannot move. But we are looking at the way whereby we build not at the blocks that are existing but in the surrounding area and asked them to move forward and if they can’t come forward, looking at the new facilities that we can move into their building to rejuvenate and regenerate. Jadi dalam ini, Dato’ Speaker, hari itu saya ada nyatakan, first project will be Mahsuri but actually Dato’ Speaker, we have many, we have three (3) on the island and two (2) on the other side. I’ve said before, apart from Mahsuri we have on the island, Taman Free School and also Rifle Range. On seberang side, we have got if I’m not mistaken, Siakap URC and also Mak Mandin. And we will move forward. We will move forward Dato’ Speaker. I don’t want to take much time up any more but we are looking at several thousand units that we can make available. On top of giving one to one, that’s mean, yang penduduk sedia ada akan mendapat, kalau mereka duduk dalam dua tiga ratus kaki persegi, kita akan bagi minimum 750 kaki persegi. In facts some project like Mahsuri, they’ve requested for 900, if I’m not mistaken. We are already considering. So, and you got new facilities and then on top of that you will get extra unit. Very important. This is one way forward Dato’ Speaker to achieved our vision Penang2030 as well, which is a very big challenge for us because of shortage of land. Dato’ Speaker, one more thing that I would like to mention is, before I end, I know it’s coming to my time now is dalam segi Kerajaan Tempatan iaitu satu portfolio yang saya begitu berminat dengan sekarang kerana kita dalam portfolio ini banyak kerja yang telah buat. Selaras dengan keperluan di bawah dokumen terpenting kita iaitu visi atau pun wawasan 2030 Pulau Pinang. It’s not been easy, but I think we’ve achieved quite a bit in the last two years because it was mentioned in August rather than a launched in August 2018 by the Chief Minister. And come now, two (2) years already, saya di dalam Unit Inisiatif Pintar kerana dalam dokumen itu, visi itu mempunyai sebagai satu tema “payung”, umbrella theme. Pulau Pinang sebagai satu negeri pintar, hijau, berfokuskan keluarga yang akan inspirasikan negara. So, for us pintar is very important on top of housing. That was, I’ve said that before my Chief Minister is said number 1, bab 1 was housing but also very important, tema pintar kita.

Untuk makluman semua dalam Dewan ini, kita telah pun melaksanakan pelbagai inisiatif pintar setakat ini dan saya hendak beri laporan yang ringkas. Kita pada hari sudah sampai 81 inisiatif. I don’t want to talk too much about all the initiatives but maybe I touch on one or two. I know that day, when I spoke about this in answer to the very important question by if I’m not mistaken was YB. Chris from Pulau Tikus. I can’t remember whether it was him but no, no I think was this side on the low carbon, Dato’ Sungai Dua. Keperluan kita kurangkan emission of carbon kita. And of course, kita menggunakan banyak teknologi pintar untuk kita hendak capai objektif tersebut Dato’ Speaker and we have to do that. And we are doing it and some of the many initiatives that we are already achieved, the 81 I’m mentioned will assist us. And as you can see this morning yang sebut tentang perubahan iklim atau pun climate crisis, actually it is not perubahan, like I say crisis and I’m very happy to know, all my EXCO are looking to it and every portfolio we have to look into it because that’s the agenda number one now. And if I can just mentioned, in Penang Dato’ Speaker, we’ve got many initiatives that we’ve already, what they call? Implemented or are in the process of implementing. Satu daripada isu atau pun tanggungjawab terbesar di kedua-dua Pihak Berkuasa Tempatan adalah pengurusan sisa pepejal. Dan ini ada satu impak besar kepada pengeluaran…(gangguan).

Speaker (Speaker)EN

Datok Keramat, the time is also up.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Yes. Just the quick one.

Speaker (Speaker)

Last point.

Ya. This is the last one. After this one I’m done. So impak besar daripada karbon adalah bagaimana kita uruskan sisa-sisa pepejal kita. And we are going newer technologies, Dato’ Speaker. For your information, your area Dato’ Speaker, kita sedang ada satu RFP di Ampang Jajar untuk diperbaharui tempat pengurusan sisa pepejal di situ. And in the RFP, for your information, we’ve requested for new technology which include waste energy and that’s extremely important one example that I give you. The other example and I want just to end by saying this of course, Gurney Wharf was mentioned by Pulau Tikus, you know why I mentioned all this? It’s because like just now I think for reclamation, we talk about reclamation, kita akan pastikan ada tempat hijau. Gurney Wharf is fully hijau lah, technically speaking, the dream park. You need that to balance the carbon emission, because that’s where oxygen comes out, so very important. In Penang so far Dato’ Speaker, one important thing, I just want to end, we’ve planted around 400 thousand trees from my report since 2008 until now 2021. And we are of course targeting for more lah. We are moving from that. Now one thing I want to know, let everyone know dalam Bajet Persekutuan yang baru-baru selesai dinyatakan oleh pihak Perdana Menteri, 10 juta pokok setahun akan ditanam oleh Kerajaan Pusat so I would like to know, for Penang berapa kita akan dapat? Kerana kita tak ada maklumat itu. So that is important, so this is part and parcel of the entire agenda. I think the rest all for I’m running out of times. Rakan-rakan ADUN saya yang ada soalan, as usual my door is always open, please just come and see me, I

give you the information. Sekian, terima kasih. Saya pohon untuk menyokong. Thank you very much.

Speaker (Speaker)EN

Thank you, Datok Keramat. I would like to invite the Honourable Sungai Puyu.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you for being invited to wind up this afternoon. First, I would like to express my gratitude and thanks for still being entrusted to shoulder the responsibility as Chairman of the State Executive Council (Majlis Mesyuarat Kerajaan, MMK) Committee for Environment and Welfare, and to deliver the winding-up speech on issues related to the portfolio by the Honourable Member on the Supply Bill and the Development Estimates Motion for the Year 2022, as presented by the Honourable Chief Minister. With full conviction, I believe the Penang State Budget for the Year 2022, with the theme "Accelerating the Achievement of Penang2030", will give new life to revitalising the economy of the State of Penang while we strive towards victory in the ongoing fight against COVID-19. In the field of the environment, we all indeed realise that environmental issues are becoming increasingly challenging, and efforts to address them require high cooperation and commitment from all parties. Environmental problems such as air pollution, water pollution, solid and toxic waste disposal, illegal logging, depletion of natural resources and so on, have resulted in an imbalance in the environment. Landslide tragedies, flash floods, air, water and land pollution, global warming and so on are the effects of ecosystem instability caused by climate change. Now it is a climate emergency. These environmental issues are among the challenges. Here is a question from the State Assemblymen (ADUN), especially the ADUN for Sungai Dua, regarding environmental well-being. The State Authority is indeed very committed to efforts to sustain the environment in the State of Penang, and this is not only translated into the Penang2030 vision to make Penang a Green State, but this environmental sustainability is also translated through the strategic land-use plan in the Penang State Structure Plan 2030 (RSNPP 2030), namely to maintain forested areas and further protect environmentally sensitive areas. This is the State Government's commitment to preserve the balance of development and the importance of state land use as well as environmental protection. In 2008, the total Permanent Reserved Forest was only 5,139 hectares. Now, the State of Penang has 6,568 hectares of forested area that has been gazetted under legislation for protection purposes, of which 5,366 hectares are Permanent Reserved Forest gazetted under the National Forestry Act 1984, and 1,182 hectares are the Penang National Park gazetted under the National Park Act 1980. Furthermore, under RSN 2030, the State Government has set a strategy to gazette all marine mangrove forests in the State of Penang, as coastal swamps are sensitive areas and environments that must be protected, not only functioning as coastal forests for the marine industry. Here I want to inform that all mangrove forests in the State of Penang will be gazetted as permanent reserved forests here. Although the Penang RSN 2030 has been gazetted, and especially the Middle Bank and also Pulau Gazumbo, are not listed as environmentally sensitive areas, and this

possibility could be made into a development site. The State Government has taken an action and a decision that the area there will be gazetted as a Marine Sanctuary, with an area of approximately 29 square kilometres. This is very important because we have seagrass at Middle Bank. This seagrass extends approximately 2 kilometres and its area is approximately 40 metres wide, and there we have many, as here there are a total of 4 types of seagrass identified at Middle Bank, and there are also 52 species of 39 genera and 24 families of molluscs found there, and there are indeed 37 species, 15 new species of bivalves reported. Now the Penang Institute together with CEMACS has conducted research and so on. I thank the Federal DOF (Department of Fisheries) for giving full support that the area there will become a marine sanctuary and can be gazetted. By establishing a marine sanctuary, where we will become a food security site there. On Jerejak Island, some people have made certain statements related to this. After gazetting as Permanent Forest, the remaining lands that cannot be sold, and the island becomes a smoke-free island, meaning smoking is prohibited anywhere except in one's own residence. Here, we have also made it a place where, after crossing the bridge, only EVs may enter there, apart from Government vehicles and vehicles for emergency purposes only; all others must be EVs, electric vehicles. This is one of the steps taken by the State Government to protect the environment. Here I also want to tell you that in the environment, there is a study conducted by Think City and the Think City Report to the State Government on climate emergency. The State Government has made a decision that for all new development places, we will encourage that all walkways and driveways must use recycled material, that is construction and demolition waste, which will be used as interlocking bricks. This can solve the problems of construction and demolition waste disposal, which has also been addressed. One question from Tambun, the ADUN for Tambun is not here, is he? Regarding aggregate at present. Indeed, there are currently 8 quarries in operation. Before this Government in Penang, we had no quarry rules. I thank the relevant EXCO members, namely the former ADUN for Batu Maung, who helped coordinate with the Penang Quarry Rules. The Penang Quarry Rules have been enforced because they have been gazetted. If there was none, I am not lying, we have the latest total of 5 quarries that have not yet obtained a licence, 4 of them in Penanti, because they do not have a rehabilitation plan. The State Government will propose that an RFP be called so that those four can work together, or a company or group can use the site to turn it into a nature water reservation area. Once done, we can take water after intake by PBA (Penang Water Supply Corporation) and store the water there as water security for the State of Penang, and it can also be used for agriculture. This is called food security. This is being addressed now. In Juru, because of complaints and disturbances caused by residents there, its licence was not approved, because they have to resolve local problems. The Penang State Government fully supports the Federal Government in enforcing the Rio de Janeiro Declaration of 1992, which says that any development must have 4 pillars: one pillar is the economy, the economy must protect the environment, and the economy and environment must be protected for the stakeholders, namely the residents there. This is also enforced by the State Government under LA 21. I believe the State of Penang is the only state that enforces these policies. Another is at Teluk Bahang, although it is a development quarry, it violated the conditions, and MBPP (Penang Island City Council) has taken court action. This is how Penang protects the interests of the environment.

Speaker (Speaker)

Habis dah?

Phee Boon PohDAP · PHSungai PuyuEN

Not finished, there's a lot.

Goh Choon AikPKR · PHBukit TambunEN

Mr Speaker, may I have the floor. Thank you, Honourable Sungai Puyu, regarding what you said earlier about these quarries. Is it true that the existing supply is insufficient? That is first. Second, the issue I highlighted is whether existing quarries face problems with levels exceeding 76 metres. Can existing quarries be permitted? And third, is the Government still open to allowing new quarries to be opened? That is all.

Phee Boon PohDAP · PHSungai PuyuEN

They must follow what is in the RSN. I thank Tambun for confirming that beyond 76 metres we do not grant them permission, and if they wish to appeal, the appeal too must protect the environment, which is extremely important. Why is there not enough aggregate in Penang? I do not want to blame the MCO, but another reason is the rate of development in Penang. If the State Government does not enforce the Penang rule and the quarry rule, does not supervise and does not take action, there will certainly be plenty of aggregate. But they must coordinate properly. Whether they are freehold or leasehold, they will be separated out for payment of whatever licence 4C is concerned, because the royalty to be paid is in the interest of the people of Penang, and all of that is also a source of revenue. Next is a step that is also reflected in the Penang Green Agenda, which was launched by the State Government in 2021 as a state policy document setting out the target of Penang achieving a Green State by 2030. The Penang Green Agenda is a strategic planning guide, including indicators of development capacity in line with the industrial development goals of the UN (United Nations) Sustainable Development Goals, in facing global environmental challenges now and in the future. Dato' Speaker, here too there are people who raise issues, as the Honourable Tambun did, about more than 76 metres. I thank the MBPP because there were many complaints or allegations that there is development, people say agriculture, on the hills and elsewhere. Penang is the first state to create right-of-way guidelines to control development, especially agriculture carried out on hills. In 2020 a meeting was held with all landowners, especially in Bukit Bendera, and there were discussions. An agreement was reached on the way machinery could be used there. All this has been done...(interruption)

Speaker (Speaker)EN

Honourable Member, roughly how much longer?

Phee Boon PohDAP · PHSungai PuyuEN

Another half an hour.

Speaker (Speaker)EN

No, sorry, I want to adjourn the House for a break, and after the break, according to the time allocated, the Honourable Member still has another 20 minutes to conclude the winding-up speech of the Honourable Sungai Puyu, so Honourable Members...(interruption)

Phee Boon PohDAP · PHSungai PuyuEN

Dato' Speaker, may I make a statement? It is not about the time, but the questions raised in this honourable House must be answered by a responsible person.

Speaker (Speaker)EN

Another 20 minutes, no problem, I will allocate it. Honourable Members, we will take a break and reconvene at 2 p.m.

The House was adjourned at 1.00 p.m.

The House resumed at 2.30 p.m.

Secretary of the HouseEN

Honourable Members, Honourable Deputy Speaker of the State Legislative Assembly.

Deputy Speaker of the HouseEN

The winding-up session for the Appropriation Bill 2020 and the Development Estimates Motion 2020. Please proceed, Sungai Puyu.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you, Deputy Dato' Speaker. The State Government also, on 30 September 2021, gazetted 3,685 hectares of permanent forest reserve as water catchment forest under the National Forestry Act 1984. This gazettement further strengthens the protection of this area as a double protection, together with future development, which will likewise be gazetted as a water catchment area under the Water Supply Enactment EPA 1998. The Water Supply (Catchment Areas) Order 2004 was made on 2 December 2004. 2 December, that is, in 2004 there was indeed this law, but it was not gazetted, and today the State Government has gazetted double protection one, as permanent forest reserve one on the water catchment area. Compared with Kedah, where forest reserves can be logged, in Penang that is not allowed. This place at Telok Bahang we have gazetted. Water catchment area, it's a double protection for the people of the state of Penang. Based on the records of the State Forestry Department, a total of five cases of illegal clearing in permanent forest reserves were recorded in the period from 2016 to 2020. These activities were detected and carried out by local residents for agricultural purposes, and this arose because the landowners were unaware of the true boundaries of their respective land. From 2016 to 2020 there were only five cases, and these five cases were from landowners who did not know where their boundary was. Here I wish to record my thousand thanks and deep gratitude to PBA, where PBA also has a system. Every month they give reports on the sites that have been gazetted as water catchment areas. Whatever they do is all reported to the office of the EXCO, to me, and to the ADUN for Tanjong Bunga. This is the system we have, so to the Leader of the Opposition, do not worry; we do not sleep, our work is done 24 hours. The State Government, through its departments, agencies and Local Authorities, will continue to channel energy into monitoring and enforcement, to carry out site clearance work by landowners specifically for forested land located on hills. The State Government also greatly welcomes information from the public in channelling information on suspicious activities in hilly areas to the departments, agencies and PBT. So I thank one NGO group, people who love the hills, because every week they jog and run on the jungle trail. They also help the State Government to obtain signs, and they also provide reports on activities there by taking photographs and sharing locations. That is one form of support from people who love the hills.

Budget for the environment covering other areas. Answering the question from the ADUN for Sungai Dua. Regarding the environment budget, it is focused only on the hill and botanical areas. For the information of the Honourable Member, the Development Budget for 2021 for the State Forestry Department of Penang is RM2.22 million involved, and this we also received similarly. Not the amount of allocation, but the amount of work done. This is not the amount of money; this is the among of commitment. If it is not enough, I believe the Chief Minister can give additional allocation.

Seeking clarification. I am very interested in what was raised by Sungai Puyu regarding the programmes carried out to overcome the problem of hill clearing and also the denudation of hilly areas. What I am concerned about in terms of monitoring action is that there are NGOs that help and so on. But the focus of the Forestry Department is only on areas within forest reserves, forests that must not be disturbed. For these privately owned areas, private land, it is in these areas that hill clearing often occurs, which causes water flow to run downhill and causes flooding. So what is the action to address the problem of individual land, private land that is cut, cleared, sometimes takes quite a long time? So what is the action for individual land?

Phee Boon PohDAP · PHSungai PuyuEN

Good, I will give one example. There is a plot of land, privately owned, even though they obtained permission, approval and allocation from the Department of Agriculture to improve the soil and plant better species of durian, and because they had already obtained agreement and permission, they proceeded straight away with the land work. The State Government did not accept this. The State Government has blacklisted this contractor. All projects in the state of Penang. All blacklisted. No more plans are allowed to be submitted or amended for about one year. Today too, the sites they worked on without submitting a planning plan may do nothing and may only rectify. I give assurance that the Ops Lumpur Committee also does not sleep, and every month they must submit reports, and every three (3) months we hold a meeting. We meet to receive reports and what action has been taken, and not only once; after action is taken, we check again with them. This has been done because at first we invited Honourable Members from the Opposition Party to sit on the committees to be established, but they did not want to. Not willing to work, only willing to talk. Right? Should I call and invite? It was not accepted because the state administration does not want political elements, but more than that, contributions from all parties, including the opposition, are welcome. The State Government has missed out several times, like the fight against COVID. Should I invite them this time? I want to thank the Opposition Members when I was asked to lead COVID. I invited them to give assistance, namely now a 24-hour call centre, they also sent representatives, we also gave training and so on. Time is not permitted. In the environment, one very hot issue is plastic waste, a waste plastic recycling industry. Since 2016 I have raised this issue, and in 2018, when there was a change of government, I was only able to make some progress because Penang is not a dumping ground for plastic waste to be recycled. No, but they bring it in through certain methods by saying a good friend or they get an AP...(interruption)

Deputy Speaker of the HouseEN

Bukit Tengah and Kebun Bunga, please reduce your volume.

Phee Boon PohDAP · PHSungai PuyuEN

And as for the plastic recycling industry, the State Government firmly holds that we do not want to accept counsel waste, only pre-consumer waste, not the waste they collect from landfills and so on, no way. The State Government's position is that we will enforce Circular 9/99 from the KPKT, the KPKT of 1999, which itself issued this circular; enforce it. Before an AP can be granted, there must be reasons and agreement from the Local Authority in the State of Penang. We are not trying to take away rights, but we want to enforce that, when entering the village, according to custom, comments must be obtained from the Local Authorities: does this company really have its base in the State of Penang? Does it have a factory here? Is the factory in the correct zone or is it an illegal factory? And also request from the JAS Penang. Are their equipment for water filtration before discharge, the discharged water, all perfect? Once it is all perfect, only then can we give them approval for an AP, and one additional condition is that they must help the industry of the State of Penang, namely that, with its capacity, it can only bring in 70 per cent, and the remaining 30 per cent must be purchased from and by local people, so as to support the recycling industry of the State of Penang. Today, it is very regrettable that even though the circular was issued by the KPKT itself, it is not respected. And now, when we make an appeal, push and pull, I say MITI, push here, there is nothing. I want to enter the house of the YB. Deputy Speaker, I have to knock on the door and ask permission before I can enter, right? This is the policy we want: all recycling that wants to come in, whether plastic waste or e-waste, must obtain agreement from the Local Authority. On one issue that is often questioned and is also affecting the development of the estate industry, this is the word pig, especially at Valdor. I wish to inform this honourable House that after four years of the State Government striving to obtain permission and approval from the Federal Government, recently we were able to set up something called biogas that generates electricity from pig manure. Now they have obtained all approvals, they have called tenders and they will start work in December. I hope that within two years they can complete and begin operation. An agreement has been reached with the pig farms, where three public consultations have already been held. I hope and pray that within the two years from now everything can be completed, and when it is completed my fellow EXCO will begin the clean-up; after his ponds are cleaned, the JPS will clean the drains, and our rivers will be cleaned, and this will also be done in line with the scheduled timetable for the PDC to develop the industrial estate at Batu Kawan and also at Byram Estate...(interruption)

Goh Choon AikPKR · PHBukit TambunEN

I seek clarification. Thank you, Deputy Dato' Speaker, thank you YB. Sungai Puyu. Indeed the biomass project began to be discussed at the end of 2015, and the EIA approval was obtained only at the beginning of this year, if I am not mistaken, and now the building plan has obtained approval. Therefore, I hope YB. Sungai Puyu, we can ensure that all livestock breeders join this programme, because until now there are still not all livestock breeders who have signed an agreement with this company to ensure all sewage is channelled to this biomass plant, that is the first point.

Second, for me, the control of sewage discharge is more important than a closed system, because at this time there is indeed uncontrolled discharge of sewage that enters drains, then passes through residential areas and goes directly into the waters of Pulau Aman and Bukit Tambun. This has caused many problems along the drains or rivers, apart from pollution. Taman Hijauan Valdor, namely Lorong Hijauan Valdor 39 and 40, has experienced problems where all metal materials face rust and corrosion. This corrosion is truly frightening, like termites eating wood; this air eats iron. I also wish to thank the State Department of Environment, which carried out an on-site survey, and the evidence has been submitted to the State Government, and I hope this project can be carried out as quickly as possible. Within two years, if the development of the Batu Kawan Timur industrial area is also completed, within two years we will resolve the pollution problem, and we will also obtain an industrial area of approximately 700 acres. Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

Honourable Deputy Dato' Speaker, the statement from the Honourable Bukit Tambun is well founded. In the investigation by the Department of Environment, it was confirmed that one of the causes of erosion comes from the air, and the air comes from a fumes that fumigated.

Deputy Speaker of the House

Sulfur dioxide.

Phee Boon PohDAP · PHSungai PuyuEN

Yes. Here I wish to make a further appeal that the Ministry of Agriculture conduct a legal review of which chemicals may be used in animal feed. One source is from the feed meal, so we need to look into all these chemical substances that we put in the feed meal. I ask the Director to also convey this in the report to the Ministry.

A small addition, YB. Sungai Puyu: will this biogas, biomass project also involve a collection centre in the Kampung Selamat area to collect this pig waste and send it to a processing place there, so that it is no longer discharged into the rivers? Will that also be done in Kampung Selamat?

Phee Boon PohDAP · PHSungai PuyuEN

Yes, this will be done, and for this project now. The chairman who will look after the cleanliness of the rivers and this problem is chaired by the Deputy Chief Minister I, and I am also a Committee Member there, and we have conducted a review and met several times, namely we are very concerned about the problems there, even though it has been going on for more than 60 years.

Honourable Deputy Dato' Speaker, the reclamation project of 650 hectares from Bagan Ajam to Telok Air Tawar that was raised by the Honourable Member for Sungai Dua is indeed a project by Rayston Consortium Sdn Bhd, and the reclamation agreement was signed on 16 June 1999. Here I give assurance that all the conditions applied and the recommendations applied for Gurney Drive will be used there, and this is not, as people say, a passed stone but a living document. Whatever additions are to be made will be done there, as raised by the ADUN for Sungai Dua, saying that refund discharge is also taken into account afterwards, so accordingly, although at that time they did not have a condition that this reclamation could not be connected to the mainland, there was no condition, and remember the developer has rights. I have appealed that it must be reviewed again and asked them that when reclaiming land, it must be about 200 metres from the mainland. Even though it has been signed, I have made an appeal that it must be reviewed again, because if this had been made a condition and agreed, the problems raised by the Honourable Member for Sungai Dua would all be resolved. We have taken note of this, because the problems of floods and discharge of land, these were indeed discussed by us before the Honourable Member for Sungai Dua raised them. But I also wish to say thank you, we are very concerned.

Honourable Sungai Puyu, the project at Bagan Ajam was originally a reclamation project from BORR. And what I see there is that we also need to look at other aspects besides the damage to the natural environment, fishermen and so on. I did raise that issue, and whether, given the security issues and so on, it is possible for this project to be stopped or not implemented. Are there any other problems if termination occurs, such as an increase in lawsuits or claims for payment from the companies and so on against the State Government, is there such a thing, and perhaps the EIA will consider the objections we have made. I am afraid there may be, in terms of the security of the TUDM (Royal Malaysian Air Force) and so on, that it may hamper development, and that is why we are trying to object. If possible, please explain a little more about these issues.

Phee Boon PohDAP · PHSungai PuyuEN

Indeed, in terms of security and other matters, all projects close to the airport and so on, they have the power to limit the number of storeys for security reasons. Indeed, in the Bagan area many applications for the development of multi-storey flats have been rejected and restricted because of air force ways and security, there is indeed a law. If a proposal such as that put forward by Honourable Sungai Dua to cancel it is made, the Federal Government indeed has no power. Alright, to guarantee the social impact to address the social effects that will occur, the State Government has required developers to prepare a Social Impact Assessment (SIA) report. The preparation of this social report is carried out in accordance with the provisions of the Akta Perancangan Bandar dan Desa 1972 Akta 172. Under Akta 172, the State Government is indeed committed to reclamation projects in the State of Penang needing approval, especially approval of the Environmental Impact Assessment (EIA), and recommendations to have an appropriate action plan to address mitigation in Penang due to carbon effects and because of the crisis and the measures to address the climate crisis. My State Government would like to answer the question raised by the Honourable Bukit Tengah, that the Penang Green Council

has published a report on the impact of climate change in Penang in March 2021, and has gathered information, data and findings from various sources to highlight the risks and impacts that Penang will face due to climate change and….(interruption)

Deputy Speaker of the HouseEN

Honourable Member, two minutes more… wrap up..

Phee Boon PohDAP · PHSungai Puyu

Saya belum…(gangguan).

Deputy Speaker of the HouseEN

It is already more than the time given.

Phee Boon PohDAP · PHSungai PuyuEN

Injury time, alright.. for the environment I cannot answer because time is limited, it is not that I do not want to…(interruption)

Deputy Speaker of the HouseEN

You may give a written reply directly to the Honourable Member who asked.

Phee Boon PohDAP · PHSungai PuyuEN

If they are still interested. For welfare, I have several issues that I flip over, indeed it is said the problem of homelessness. The State Government has given an allocation to MBPP (Penang Island City Council) to establish a homeless centre in the State of Penang. Initially we had a schedule to follow, but because of the MCO we were delayed by about 4 months. An EOT (extension of time) has been given and agreed. Initially they were given a schedule in October because our MCO had allowed them until this March, which has been agreed. One very important issue is about dialysis, because dialysis, this issue has been raised several times, especially by Bagan Dalam. Now, dialysis stations across Malaysia in 2021, we only got figures up to 2018 from the Ministry of Health. In Malaysia there is a total of 44,136 patients, in the State of Penang there are 1,751 patients. If we take the growth rate of dialysis patients, Malaysia will have in 2021 about 45,000 and in the State of Penang about 3,300. Across Malaysia, the total number of dialysis machines is 11,100 machines and in the State of Penang it is 870. The State Government is very proud that the State Government has established a centre in Balik Pulau called the CAT Dialysis Centre, there we have 80 patients and a total of 14 machines, and here if we take into account the growth, we will get about 180 patients by 2030. Here the dialysis centre is indeed the cheapest because it is supported by the State Government, patients only pay RM10.00 for everything, not only from the State Government but supported by NGOs, NGIs in Penang, they give support through an association, the Penang Community Chest. The Penang Community Chest, we have a permanent Chairman who is the Chief Minister and

the Deputies are the Deputy Chief Ministers I and II, and the EXCOs are the committee members. We give assistance to them….(interruption)

Deputy Speaker of the HouseEN

Honourable Sungai Puyu, are you alright? Finished?

Phee Boon PohDAP · PHSungai Puyu

Belum.

Deputy Speaker of the HouseEN

So because according to the schedule it must stop at 2.30, I have added 7 minutes for you, I will give you the last 3 minutes until 2.40.

Phee Boon PohDAP · PHSungai Puyu

Hampir 2.40.

Deputy Speaker of the House

Okey.

Phee Boon PohDAP · PHSungai PuyuEN

Alright, I thank the NGOs that gave full support to the Penang Care Alliance. Here I would like to record a thousand thanks to two very important NGOs in Penang Lawan COVID-19, namely Tzu Chi and also One Hope Foundation, where both these associations have given very generous contributions, whatever is needed by the JKN, the State Health Department (JKN), whatever their request, they try their best to give it…they do not give up and every day there is support. As chairman of the Penang Care Alliance, I thank the Honourable Chief Minister who gave assistance and also the encouragement so that all this could come into being. This is not just dealing with COVID cases today, we are dealing with post-COVID cases because now we have about 210 oxygen concentrator units which we have given as assistance to those in need, all…(interruption)

Satees A/L MuniandyDAP · PHBagan DalamEN

Honourable Deputy Dato' Speaker, this is about the dialysis centre that I have made…(interruption)

Deputy Speaker of the HouseEN

Honourable Bagan Dalam, I recall about the dialysis centre, your question has been answered by Sungai Puyu…(interruption)

Satees A/L MuniandyDAP · PHBagan DalamEN

Not yet. That is what I want to point out, I want the question I asked to the health side, but the Honourable Sungai Puyu answered. My application is to establish a dialysis centre and also a wound care centre in Butterworth, in the Jalan St. Mark area, in the old government building there, so will this become a reality, Honourable Sungai Puyu? That is all.

Phee Boon PohDAP · PHSungai PuyuEN

Yes, if you ask me, the State Government indeed wants to have a dialysis centre in Bagan on Bagan Luar Road. We have made several applications but the applications were rejected, rejected by the Federal Government, namely the Director of the Ministry of Health (KKM). It was rejected because he said the dialysis centre was sufficient, but with the people on the ground, such as the ADUN for Bagan Dalam, we see that it is not only a dialysis centre but a wound centre. This is a place where they enter a room, press and full oxygen treatment, this is also what someone calls modern therapy for sportsmen. David Beckham, when he wanted to play for England in the World Cup and was injured, he entered there, so it increases the rate of recovery, this is also used by the navy. When they go deep-sea diving at Pulau Lumut, they have a facility, they go in there for treatment. This is important, I hope the JKN can give consideration to all these applications, and before I end or before being ended by the Speaker just now, I want to do this, I want to record my thanks to all the ADUNs who have made great efforts when we said that the public delivery system, that is, we obtained a list of names from the District Office of anyone under home quarantine or home positive cases, they contact their families, ask what facilities they want, oximeters too, the State Government received donations and handed them over to them, food handed to them, who went down to the ground? The ADUNs who went down to the ground, including the ADUNs of the Opposition, and the ADUNs of the Opposition must record in this honourable House that Penang Lawan COVID, the Penang State Government, is the only state that does not play politics…(interruption)

Deputy Speaker of the HouseEN

Thank you, Sungai Puyu…(interruption) Honourable Sungai Puyu.

Phee Boon PohDAP · PHSungai PuyuEN

One minute.. why did the Chief Minister receive it, the Leader of the Opposition also received it, how many food baskets did the Chief Minister get? The Leader of the Opposition also received one. Unlike the Federal Government, where although it has already approved RM22 million, every MP got 1000 boxes of food worth RM100 per box, lost, misplaced, right? When the State Government distributes donations, we take the names from the JKN. Whoever has names at the JKN who receive monthly assistance, we will hand it to them, the names we obtained from the District Office, we will hand them over to them. This is the performance of all…what ADUNs in the State of Penang led by the Honourable Chief Minister, this is how we do it, so I hope my voice here is recorded and conveyed to the Federal Government, follow Penang. Penang leads in the management of COVID. That is all, thank you and I support.

Deputy Speaker of the HouseEN

Thank you, Honourable Sungai Puyu, the floor is given to Padang Lalang.

Chong EngDAP · PHPadang LalangEN

Honourable Mr Speaker, first of all I would like to record my appreciation and thanks for the opportunity given to me to wind up the debate on the 2022 Budget speech. Thanks also to the Honourable Members who touched on matters related to my portfolio, namely Social Development and Non-Islamic Affairs.

Dato' Mr Speaker, the Social Development EXCO has received 13 questions on social issues, especially involving cases of domestic violence, cases of suicide and baby dumping. I would like to thank the ADUNs who raised these issues, which are equally important as other issues. Statistics from 2015 to June 2022 reporting cases of baby dumping in Malaysia number 652 cases. This shows how serious the social issue is that is plaguing our country. Therefore I also support the proposal of the ADUN for Batu Lancang to expand awareness and the factors contributing to the increase in this issue. Most mothers who become pregnant without a valid marriage are often labelled with a bad stigma, causing them to be more inclined to abandon or dump babies because of shame and fear. This is not an excuse for them, but this is a fact, yes. Moreover, these mothers will feel desperate when they do not receive emotional support from their own families, no one supports them, they should not be blamed by society, but a better support and education system must be established by the family, teachers, non-governmental bodies and the government itself must play a more effective role in curbing the issue of baby dumping. This is a complicated and complex issue and requires the efforts of all parties to curb this issue. In addition, social issues such as suicide have also been increasing during this pandemic season. The Department of Statistics Malaysia reported 78 suicide cases in 2020 and 65 cases in 2021, the first six months I think, where 78 percent of victims out of total cases were men. However, for attempted suicide cases, statistics show that out of a total of 137 cases reported from 2015 to July 2021, 63 percent of victims were men. This means more men die or are dead from suicide compared to women. Why is it like this?

Deputy Speaker of the House

Stress and tension.

Chong EngDAP · PHPadang LalangEN

Ha, that's right. Men are more stressed. But many men don't realise they are very stressed. (laughter)

Deputy Speaker of the HouseEN

CM, directed. Directed to the CM...(laughter).

Chong EngDAP · PHPadang LalangEN

Women can complain, can cry, can talk with friends. They will call a hotline. But men don't do like this. They all keep it in. This is...(interruption).

Deputy Speaker of the House

Champions.

Chong EngDAP · PHPadang LalangEN

Gender stereotype. Yes. A man must show that he is strong. He....(interruption).

Deputy Speaker of the House

Champions.

Chong EngDAP · PHPadang LalangEN

Masculine. If you are a man, don't cry. That is always taught from childhood. So it becomes a characteristic of men. So men are often associated as masculine and strong, causing them to dare to choose more violent methods of suicide which result in death. Meanwhile for women, who are seen as gentle, they will be more inclined toward methods that are less violent and have a high possibility of not resulting in death. Women, many of them take medicine. They take sleeping pills, some also after taking them they call on the phone. There are also, cutting...(interruption).

Deputy Speaker of the HouseEN

Most cut themselves, cut their wrist veins.

Chong EngDAP · PHPadang LalangEN

Yes. They, they as they commit suicide, for women it is a way to make a protest and not really wanting to die. But for men, they really want to die. That is why, more men die from suicide.

Deputy Speaker of the House

Hesitation cuts, they called it.

Chong EngDAP · PHPadang LalangEN

Yes. So, the first problem is baby dumping, the mothers. Mothers who are not supported, mothers who are very young teenagers, not yet married. So they are seen as a, a very bad phenomenon. They are looked down upon, they are discriminated against, no one will support them. Even though there is no human who does not make mistakes in life. Adults also make mistakes. So, if they are young people who are just learning, I think we need to be, more, more, more sympathetic towards them. Pity them and provide guidance, yes. Let them have a second chance and not be unwilling. Not only are they not willing to support them, but they always speak badly of them. So both these social issues reflect the impact of gender stereotypes on women and men. Although they face different life pressures, both fall victim to gender stereotypes until they can take their lives. Therefore it is important that we stand, equip ourselves with knowledge and be more sensitive to gender or gender sensitive so that these stereotypes can be eliminated. The Penang State Government through PWDC (Penang Women's Development Corporation), is very concerned about the issue of gender stereotypes in Penang and constantly carries out programmes to provide knowledge and share about the importance of curbing gender-based violence. This also includes domestic violence. Yes, gender-based violence is due to the inequality of power between perpetrator and victim. "It is power based, it's not simply gender based". I would like to take this opportunity to thank the ADUN for Bukit Tambun who recognised the efforts of the State Government through PWDC and always gave full support to our programmes. Yes, Tambun, Bukit Tambun, Honourable Bukit Tambun has a group of women under its JPWK (Women's Development Department). It has been very, very successful in the JPWK programme. Congratulations, Honourable Bukit Tambun. So, regarding support services for social development in Penang. The Safe Family Policy is a State Government initiative to establish a support system of First Support Points to give immediate assistance to victims of domestic violence by making referral cases to the appropriate parties. At present, 42 First Support Points involving ADUN Service Centres, Non-Governmental Organisations and Religious Organisations have been established. I agree with the ADUN for Sungai Pinang and Seri Delima, to increase and expand further support and assistance to victims in Penang, especially in different sectors. Therefore, through the Peace Start From Home campaign launched in October, a total of eight (8) awareness sessions have been held, and attended by 300 participants from Non-Governmental Organisations, Educational Institutions, Medical Institutions and Religious Organisations. This initiative is to enable more members of the public to understand the issue of domestic violence and to extend help to victims. So...(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Request for explanation. Request for explanation.

Chong EngDAP · PHPadang Lalang

Ya. Okey.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Thank you to Honourable Padang Lalang, who raised the First Support Points efforts that have been carried out. I still remember at the last meeting, I also asked our friends on the opposition side to join with the State Government in setting up First Support Points at their respective service offices. So, I would like to know from Honourable Padang Lalang whether our friends from the opposition have applied for these First Support Points to be provided at their Service Centres. And one more thing, Honourable Padang Lalang did indeed raise the issue specifically involving men in this suicide phenomenon. So, perhaps we can try to include, through these First Support Points, a channel for them to lodge complaints, since Honourable Padang Lalang just now tried to explain a little, specifically the characteristics of these men who are less inclined to share the problems they face. So, perhaps that can also be included in the publicity material and promotion of First Support Points so that they know there is a suitable channel for them. Thank you.

Chong EngDAP · PHPadang LalangEN

Okay. Thank you to Pengkalan Kota. This is indeed a good proposal, and we, in the coming year, will expand our programme called Girls and Boys Empowerment. From there we will tell all the boys, all the boys, about gender differences and behaviour, and we also want to tell the girls how to protect themselves. Don't, don't be easily deceived.

Deputy Speaker of the House

Goda.

Chong EngDAP · PHPadang LalangEN

So that she, she does not become, become unwanted, let it not happen. In becoming a character in an unwanted pregnancy, teenage pregnancy. And we also want to suggest that boys do not take advantage and carry, behave responsibly, yes.

Just like now, tourism must also be responsible. So if they go on dating, they must also be responsible, yes. So earlier I had, had a little time, an opportunity to speak with our YB. Permatang Berangan, yes. And we talked about this, violence and women's issues, and he really supports it, and perhaps even though it is not, not under the State Government or the PWDC (Penang Women's Development Corporation), perhaps the opposition parties can also hold the same programme, yes. The same programme to help the community. And he is very positive about this matter. Okay, so, to promote the concept of a family free from any violence, the Penang Goes Orange campaign, or PGO, has also been carried out every year in Penang. In 2021, it had a theme related to "Committed, Collective", which aimed to create awareness about domestic violence and the establishment of First Support Points. This campaign was officiated by TYT. Tun Datuk Seri Utama, Yang di-Pertua Negeri of Penang, on 22 November. At the same time, a mobile application called "Penang Stops Violent" was also launched to make it easier for victims of domestic violence to find the nearest First Support Points and obtain emergency hotlines that can be contacted. Here, allow me to express my thanks to the ADUN for Padang Kota, Pinang Tunggal, Permatang Pasir, Penanti, Berapit, Machang Bubuk, Perai, Telok Air Tawar, Bukit Tambun, Pulau Tikus, Batu Lancang, Sungai Pinang, Seri Delima, Air Itam, KOMTAR, and the partner friends who actively supported this programme and spread the message to stop gender-based violence.

Deputy Speaker of the HouseEN

Sungai Bakap did not mention it at all.

Chong EngDAP · PHPadang LalangEN

Yes. Sungai Bakap did not mention it... (laughter). Okay, what does she mean by gender-based violence? Gender-based violence, for example, if the Deputy Speaker, because he is a man, is subjected to violence. If women are not, only men are, ha, that is what gender-based means. If only women are subjected to violence because they are women, there are several crimes that are gender-based, for example, the majority of their victims are women, namely sexual harassment. Sexual harassment and sexual crimes such as rape, extortion, these are mostly women. Domestic violence victims are 80 per cent women. So this is called gender-based, gender-based violence. This matter is very rarely found in other states, but in the state of Penang, that is why we are very active in promoting awareness of gender-based violence. I am very proud to say that most of our YB. ADUN are very sensitive to gender and support all initiatives that empower gender. I greatly appreciate the continued support from all of you, and they also take up cases. If there are cases of violence, they also help, such as in Batu Lanchang. Dato' Speaker, I would like to report on the confinement centre. The issue of the Postpartum Care Centre, which in English we call the 'confinement centre', has often been raised in this august House. This issue is very important because it is related to the health of mothers and newborn babies. At present, care centres are only recognised as businesses and registered under business licences issued by the Local Authority (PBT), and are not provided for in the Private Healthcare Facilities and Services Act 1998 or Act 586.

Therefore, the State Government, through the State Executive Council (MMK) for Social Development, has taken the initiative to set up a Working Committee to produce Guidelines for Postpartum Care Centres so that the safety of mothers and children cared for at these centres is better assured. So, I extend my thanks and congratulations to YB. Sungai Pinang, who led the Working Committee and succeeded in producing guidelines that are very, very comprehensive. I also do not forget YB. Bukit Tambun and Berapit, who also took part in the Committee. The guidelines produced will be tabled for approval at the EXCO Meeting before being adopted, because now each agency says they have no authority to implement these guidelines. So we need to give authority to the most suitable agency. I hope our Government will lead this initiative, in addition to being in line with the Penang Leads Vision. As the EXCO for Social Development, who is responsible for safeguarding the interests of women and children, I would like to propose that the State Government give authority to the Local Government, because they are the agency most suitable to issue licences for these centres. Apart from issuing licences, they also carry out regulation. So, for active ageing, active ageing in Malay is penuaan aktif. To answer the question raised by Honourable Komtar and Honourable Sungai Pinang regarding an ageing country, ageing country and active ageing…(with permission), the State Government is committed to meeting the challenges of an ageing society and is very concerned about the needs of senior citizens. At present, there are 28 registered Senior Citizen Care Centres in Penang, while 51 Senior Citizen Care Centres are not registered. Therefore, the State Government, through the Local Authority and the Social Welfare Department (JKM), is actively carrying out enforcement and whitening exercises to ensure that all Senior Citizen Care Centres in Penang are registered and operate legally, in order to guarantee the safety and healthcare of the elderly. However, apart from providing facilities, the senior citizens themselves must also practise active ageing from the social aspect, by engaging in social and physical activities such as exercise, aerobics, walking in parks, or any activities that keep their minds active, whether alone or together with family members, neighbours and the community. Older people should not be seen as a burden to a family; rather, they can still contribute to the country. More than 65 per cent of people aged between 55 and 64 in Korea, Japan and Thailand remain active in the labour market. But in Malaysia, only 45 per cent of people in this age group are actively working. In order to plan an active ageing action plan, a baseline research study will be conducted by PWDC and the Penang Institute to study the active ageing situation in Penang and to recommend appropriate measures to encourage the practice of active ageing in this state. Regarding balanced participation of women and men in leadership, we have the Gender Inclusivity Policy, the Women's Development Department (JPWK), and the Women's Assembly. The social issues mentioned earlier will always be raised if there is no gender perspective, and will continue to become serious if our legal system is dominated by only one gender. For example, the issue of the Confinement Centre was raised by a female representative, namely usually the ADUN for Sungai Pinang.

The participation of women, especially in the legislative and administrative processes, is very important, and its impact was clearly seen during the COVID-19 pandemic. Based on a study by Bloomberg this year, eight out of the ten best countries on the COVID-19 pandemic management list achieved more than 30 per cent female participation in the field of people's representation, including Finland, Switzerland, the Netherlands, Denmark, Ireland, France, Norway and Spain. These countries are also in the top ten of this year's Gender Equality Index. Therefore, balanced gender representation in the legislative and administrative system is very important for generating state development policies that guarantee the well-being of all people in Penang. The Gender Inclusivity Policy, which has been implemented since 2019, is one of the efforts by the State Government to cultivate the values and practice of gender inclusivity. This includes the practice of Gender Balanced Management, which emphasises at least 30 per cent female participation in State Government departments in Penang, the appointment of MPKK and Members of the Local Authority. Now, for the first time, the appointments of Members of the Local Authority have reached more than 20 per cent female representation since 2018. Meanwhile, at MPKK level, the majority have achieved the 30 per cent quota of female members.

YB. Deputy Speaker: Bagan Lalang, someone wants to speak.

Ong Ah TeongDAP · PHBatu LancangEN

YB. Bagan Lalang. I want to clarify a little. I have been waiting a long time. If YB does not stop, I cannot get a chance. Regarding the confinement centre, we are indeed very interested in the confinement centre. Because we see that confinement centres nowadays have indeed been set up in many places that are now more modern, even hotels have been converted into confinement centres.

YB.Chong EngDAP · PHPadang Lalang

Betul. Betul.

Ong Ah TeongDAP · PHBatu LancangEN

So my question, I want to ask now, for making a new law, so I want to know, up to what stage is it now? How far has our preparation reached? If it is to be handed over entirely to the PBT, I think the PBT will also face constraints in terms of enforcement. Because the PBT is not skilled in health matters. So, involving health with young babies, I have been there to see, but I feel afraid that there is no stricter control. There are babies, ten or even twenty, in one room. So I understand that if babies are infected, it spreads very quickly, from one to another, very quickly. So I recently also heard of one confinement centre that was infected with COVID, just one, one case, which spread to many babies who are only a month old, not yet...(interruption).

YB. Deputy Speaker: Batu Lanchang, is it a confinement centre for mothers or the child?

Ong Ah TeongDAP · PHBatu LancangEN

Both, their now, their all, both. Now all together as one. So the problem is who will go and take care of it in terms of health. What I mean is, how big must a room be to control how many babies and mothers, how? So I think the PBT does not have the jurisdiction and the expertise in terms of this enforcement. So I want to know whether other departments are involved together in making a permanent guideline and enforcement for them.

YB.Chong EngDAP · PHPadang LalangEN

Okay. Thank you. Indeed, I have also heard about this issue, because at the previous sitting, when questions about the confinement centre were raised, everyone said it was not their scope of work, not their jurisdiction. No agency wanted to answer the question, that is why I want to make a guideline and find an agency to be responsible for this issue. Because there is indeed a demand, yes, we will perhaps need to see which one is most suitable if we look at what they cannot, cannot, cannot do. What is weakness if they say they cannot? So I think the Penang Government can give support until they are able to do it. If not, how? Everyone says it is not their authority, they have no authority. We will give them authority and we will provide resources if they do not have them. But I think the guideline already has provisions on how to look after these babies. What are the rules or conditions? This is like in a hospital, where there is also a baby room, we follow the conditions of that baby room. One, one caretaker for how many babies?

YB. Deputy Speaker: Due natal-ward, due-natal, the word is due-natal.

YB.Chong EngDAP · PHPadang LalangEN

Due-natal. He or she, social, what is social distancing between them, yes. I think we can do it if we have the determination... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Of course I support it, Padang Lalang.

YB.Chong EngDAP · PHPadang LalangEN

Indeed, Padang Lalang.

Ong Ah TeongDAP · PHBatu LancangEN

Indeed, indeed I support it, it must be done, because indeed..... (interruption) you must do it, must do it, it must definitely be done, because if no one controls it, it will become even more difficult, and when I was a Councillor, I had already raised these issues, but nothing happened, so I am very happy today if..... (interruption)

Deputy Speaker of the House

Jarakkan distance maybe before, during before COVID was different, now we COVID we should be practice differently lah.....(gangguan).

Ong Ah TeongDAP · PHBatu LancangEN

No, this issue has been around for five or six years, with respect..... (interruption) more than six years, six or seven years. Indeed I support it if there are conditions or laws enforced on this issue. Thank you.

Chong EngDAP · PHPadang Lalang

Okey.

Satees A/L MuniandyDAP · PHBagan DalamEN

Honourable Padang Lalang.

Chong EngDAP · PHPadang LalangEN

I, I will give the chance to Sungai Pinang because it was she who drafted those guidelines.

Deputy Speaker of the HouseEN

The confinement centre issue has been raised for three terms..... (interruption)

Satees A/L MuniandyDAP · PHBagan DalamEN

Her children are all grown up.

Chong EngDAP · PHPadang LalangEN

(interruption) this is the champion of other women, other mothers..... (interruption)

Lim Siew KhimDAP · PHSungai PinangEN

That is why my child..... (interruption) even though my children are grown up, I will still have grandchildren, right..... (interruption) so now we want to resolve it. I am confident, it will definitely be resolved, it will be resolved.

Deputy Speaker of the HouseEN

Still fighting for children or grandchildren?

Lim Siew KhimDAP · PHSungai PinangEN

Children, grandchildren, great-grandchildren. Then I would like to give some information that we indeed held a meeting and involved the State Health Department (JKN). And thanks to Doctor Iqbal, who gave his views, such as the distance from the wall and from the bassinet. So it is 15.2, I think 15.2 centimetres, or the distance, the distance of the bassinet is 0.3 metres. There is, there is its own SOP. We take into account, we follow what was recommended and advised by the doctors, where the guidelines are used, possibly in hospitals. So we adopt them. I think this issue has been around for a long time. There is no authority, so I think we create the authority. And one is that, wait, what else should I say..... (interruption).

Deputy Speaker of the House

Terima kasih.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, yes, yes, yes. One, there is also, oh, so another point is that when we touch on health, we usually think that a confinement centre is only a place, a place where mothers rest and someone looks after them. There is a carer who looks after the baby, right, because after giving birth the mother is tired, weak. So there is a place for her to rest. She is not a patient. So, for health, if there are any health issues, they should go to the hospital, and usually many parties try to say this falls under health. So if the mother or the baby has a health issue, go to the hospital. So I think the local government, we have public health, we have doctors, so we can look into this and then we create the authority. Okay, thank you.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Honourable Member, just a moment, Honourable Member. I want to support what the Honourable Sungai Pinang said, because the Honourable Member raised the matter of the source of authority. The Honourable Member from Padang Lalang has raised this issue for many years. When we discuss the source of authority, I recall that in Penang, in the past, we hoped that the Federal level would have this source of authority, but that did not happen. Now, public health matters involve the Local Authorities (PBT), and I think that is actually the key. This means both Councils, MBPP and MBSP, can take the initiative to give that authority so that confinement centres can be regulated in the State of Penang. I believe that even at the opposition level, we have no problem supporting a proposal like this, because it is for the sake of......(interruption) yes, service. Not just for me, but for everyone, because I see that the trend in the use of confinement centres is not concentrated on just one race, in fact all races. Even within the Malay community today, many people see the need to stay at confinement centres for better care. So I hope the Honourable Padang Lalang can quickly move this proposal through the PBT, with the PBT giving that authority, both at MBPP and also at MBSP, and I am confident that can be done.

Satees A/L MuniandyDAP · PHBagan DalamEN

Honourable Member, I only disagree slightly with Seberang Jaya. If possible, the authority should come from the State Government, a parallel guideline. Later, Penang will make one, Seberang Perai will make one. That will also become a problem. Then the day after tomorrow, there will be operators who come and ask why this is allowed in the Island but this is not allowed on the other side. So there should be one guideline from the State Government applied to both PBTs.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, yes, a little addition. Yes, indeed the guideline we proposed is uniform across one state. Thank you.

Chong EngDAP · PHPadang LalangEN

Okay. Yes, this guideline will be used at MBSP and also at MBPP, first. Second, I will request, I will bring a paper to the EXCO to ask the EXCO to delegate the authority to both of these PBTs. Okay, thank you to everyone for your support. As I have said, our State Assemblymen are indeed very gender sensitive. To encourage the participation of women in leadership, the State Government has implemented various initiatives such as the organisation of the Women's Sitting Programme and the establishment of the Women and Family Development Committee (JPWK). The JPWK has been established since 2019 and has given the opportunity to more than 600 women to sit on the committee, where they are directly involved in planning and implementing more than 2,000 programmes and projects based on women and family. Just to share, JPWK Padang Lalang recently won an award from JCI Malaysia, the Sustainable Development Award in the category of SDG 5: Gender Equality. The State Government, through PWDC, has also organised the Women's Sitting to give all women the opportunity to experience a new experience as representatives of the people and to gain exposure to the actual proceedings of the State Legislative Assembly. I would like to reply to the State Assemblyman for Pulau Tikus that the Women's Sitting will continue, and thank you for always supporting this programme. Women's Sitting 2.0 will continue this year and will be held on the 4th day of December. I would also like to thank Dato' Speaker for once again giving the opportunity and supporting the course of this programme. The introduction of the Top-Up Women Only Additional Seat, or TWOAS, or Kerusi Tambahan Untuk Wanita Sahaja, in 2020 into the State Government's legal system is a natural process after the 30 per cent quota policy was implemented at the level of MPKK, Councillors and State Government Departments. So this is all in line with the Gender Inclusivity Policy in Penang. It is the only state in the whole country that has this policy. First, I would like to thank the State Assemblymen for Jawi, Seri Delima, Permatang Berangan, Bagan Dalam, Pulau Betong, Bukit Tambun, and Sungai Pinang, who showed support for the TWOAS initiative and called on all political parties to field at least 30 per cent women candidates in the upcoming general election. I strongly support this proposal. I think YB Pengkalan Kota and Machang Bubuk, they also support it too, but they did not have enough time to say it in the House. And I would also like to thank all my EXCO colleagues who all support this TWOAS, this TWOAS system. To the State Assemblymen for Air Itam and Bagan Dalam, I guarantee that the implementation of TWOAS will not become the starting point for eroding democracy, and it is not a free ticket to enter the State Assembly. Instead, this initiative will prevent abuse of the system. TWOAS candidates will be selected from the list of candidates submitted by political parties and the results of the State Election from the Election Commission, by using that list and those results in the selection process. Besides that.....(interruption).

Deputy Speaker of the HouseEN

Honourable Member, two more minutes.

Chong EngDAP · PHPadang LalangEN

I, I ask to be given more time because wearing this face mask, I cannot speak quickly. Not enough oxygen, yes. So please, please.

Deputy Speaker of the HouseEN

As requested by Perai as a widow, okay, I will add five minutes for you.

Chong EngDAP · PHPadang LalangEN

This is only one portfolio. This is because social development is big, covering all the people in Penang, and women make up 51 per cent of the population, and there are also religions other than Islam. So please.

Deputy Speaker of the HouseEN

The additional five minutes has been approved.

Chong EngDAP · PHPadang LalangEN

Besides that, to also answer the question of the State Assemblyman for Bagan Dalam, the State Government also guarantees that these TWOAS candidates are qualified and domiciled in Penang. This system is similar to the Party List system implemented in Germany, Taiwan and New Zealand. Therefore, TWOAS candidates are also chosen indirectly by the people and this is a democratic process. At this time, the TWOAS Paper Committee and the TWOAS work have produced a White Paper, and this document has been distributed to all State Assemblymen. This document provides an in-depth explanation of the method of implementing TWOAS and its benefits. I hope the Honourable Members can read this White Paper and give full support to this initiative, and the members of the TWOAS Paper Committee suggest that I thank everyone, and especially the State Government for daring to make, to make a structural change, which is bold. So, to inform this honourable House, the Penang2030 Centre is a shared-space centre that can be utilised optimally to carry out.....(interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

YB, I request a little passage regarding this TWOAS.

Deputy Speaker of the HouseEN

The time given is sufficient for him.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Honourable Member, regarding the issue of 30 per cent representation of women, I have supported this effort from the beginning because I feel women's participation is important, not only in daily life but also in state development and government administration. But the policy you want to bring, or the proposal brought by the Honourable Member, I am worried there are two risks. First, the risk is that when TWOAS exists, political parties will choose not to field candidates for the election, and then just enter through TWOAS, one. I, I see this is actually to give power to, because this is an appointed State Assemblyman, the concept is almost the same as an appointed State Assemblyman. So its conditions need to be studied or looked at, because this involves the State Constitution, first. Second, although we see there is representation, if TWOAS is to be implemented, it should be looked at from the beginning, meaning if the total State Assembly seats are 40, only if the 40 State Assemblymen do not have 30 per cent women representation, then we go to TWOAS. So for me, now, if we look at TWOAS, it will simply cause problems, for example, then we look at those who are 18 and above, how then do we discuss those aged 25 and below who have no representation in the House. So if we want to change this, it will involve the State Constitution, so I see that perhaps it should be expanded or enlarged further, and not only for women but also for other minority groups in the matter of this appointed State Assemblyman issue, and at the same time we also have to address the issue that the seats in the Penang State Legislative Assembly are only 40. If any crisis happens that results in 20-20, it means it's not odd, no, it's even, no. Here I think maybe we need to study this together, not only the issue of 30 per cent women representation, which will lead to re-legislating the State Constitution. I ask for the views of the Honourable Padang Lalang.

Chong EngDAP · PHPadang LalangEN

Thank you, Honourable Seberang Jaya. The issues raised by Seberang Jaya have all been discussed by this Committee and have also been raised by other State Assemblymen. We have examined them all, and everything is in this book, this White Paper. I hope everyone can read it there. If we are fortunate, I hope at the next sitting we can debate, we can table this, to, to amend the constitution and to have a Bill so that we can implement it. I think what has been stated has a point and is important, but at the present time, let us do what is first for women, and after that we can make amendments, we can include other groups.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Request for clarification, thank you, Honourable Padang Lalang. That day, I did indeed want to debate and touch on TWOAS, but that day the Deputy Speaker was very strict about the time given. But I hope you will give me a little more time to give my view. For me, I do support the implementation of this TWOAS, but from what I have observed, especially at this meeting, I listened to the debates of the Honourable Sungai Pinang, the Honourable Seri Delima and the Honourable Berapit, and the thing is, during our sitting, we understand that they are representatives of women in this honourable House, but for various reasons, perhaps in terms of time and also the opportunities available. I think that in the overall time given for holding the debate, the issues closely related especially to women and families have actually been cut short, because I also understand that the Honourable Sungai Pinang, the Honourable Seri Delima, the Honourable Berapit and the Honourable Pematang Berangan also need to raise issues from their own constituencies, that is the constraint mentioned. So I have also proposed that perhaps we can look at our meeting system, our sitting, whether to have one special day where we only discuss issues concerning women and families. I believe the Honourable Seberang Jaya, too, if given the opportunity and enough time to speak on issues concerning women and families, and I am also confident that my fellow comrades, the Honourable Members who are men, if they have the opportunity, can also bring that up. But that is the time limit, and our existing sitting system may be part of that restriction, so I hope this proposal can be considered.

Deputy Speaker of the HouseEN

Thank you, 20 minutes plus 2 minutes, that is 22 minutes already.

Chong EngDAP · PHPadang LalangEN

Okay, thank you, Honourable Pengkalan Kota. Regarding this Penang2030 Centre, I want to explain one point: this centre is not intended to take over the function of the State Assemblyman Service Centre (Pusat Khidmat KADUN), but to enable the State Government to get closer to and understand the needs of the people, and also to organise community programmes and to convey Government messages to the community.....(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Deputy Speaker, I have, I want to ask just one thing, not a question...(interruption).

Deputy Speaker of the HouseEN

There is no time. Bagan Dalam, sit down first, because the time here has already run out.

Chong EngDAP · PHPadang LalangEN

Later, later, I have an issue regarding Non-Islamic Affairs. Thank you to the Y.A.B. Chief Minister for continuing to support and allocating a budget totalling RM1.1 million to Penang Harmoni Corporation Sdn. Bhd. to continue various religious and harmony programmes under my portfolio next year. Strengthening the governance of Non-Islamic Affairs, that is why we established Penang Harmoni Corporation, or HARMONICO. As the Honourable Members are aware, the State Government has established Penang Harmoni Corporation Sdn. Bhd. or HARMONICO, aimed at strengthening the governance of Non-Islamic Affairs, while at the same time playing a role in nurturing universal values and spiritual understanding among different religions as a basis for an inclusive and harmonious society. HARMONICO has also implemented various activities and programmes such as Cycle The World, Cycle For Peace, to convey the true message of peace in conjunction with the International Day of Peace. Harmony and peace will not be achieved if there is no mutual understanding among races, religions and cultures. Through HARMONICO, the State Government has taken the initiative to produce a series of videos on festivals in Malaysia named Kenali Perayaan Kita. The video series showcases the background of the festivals and also emphasises noble values for the community to appreciate. Among the videos that have been produced are for Hari Raya Haji, the Hungry Ghost Festival, Navaratri, My Emperor God and Kathina. I believe that by understanding the customs and culture of other races, respect will arise. A spirit of mutual respect and understanding among the various races is the key to the peace, harmony and unity we have enjoyed all this time. Besides that, to support the National Immunisation programme, HARMONICO has collaborated with several religious organisations to encourage their followers to get vaccinated. HARMONICO will continue to work with stakeholders to ensure we can form an inclusive and harmonious society. The State Government has established a Non-Islamic Places of Worship Coordination Committee for the purpose of implementing several initiatives, among them to resolve any issues involving Non-Islamic Places of Worship (RIBI), and to endorse applications for the alienation and leasing of land for new sites or the replacement of non-Islamic religious building sites. For information, any enforcement action against RIBI built without a permit must also be referred to this Committee so that Non-Islamic Places of Worship in this state are better protected. The State Government has allocated a total of RM8,479,009.44 under the RIBI Trust Fund Committee, or Non-Islamic Places of Worship Trust Fund, since 2016. Up to now, this has been given to various Chinese and Buddhist temples, Indian temples, churches and gurdwaras. For the information of all, the government has also allocated a sum of RM300,000 every year since 2018 to the MMK Non-Islamic Affairs to organise religious programmes and to support community and social activities organised by religious bodies as well as Non-Islamic Places of Worship. Up to now, a total of 74 RIBI have received allocations through the MMK Non-Islamic Affairs. This allocation is also given to RIBI that organise community programmes. This fulfils the aspiration of the Penang State Government to create an environment where RIBI also play a role as Community Centres. For example, for the Christmas celebration this year, RM47,000 has been allocated to 10 churches in Penang that are involved in community activities. I also believe that many Honourable Members also organise various community programmes together with RIBI or religious associations using their respective financial allocations.

Dato' Speaker, we, I, give all these allocations because some people have criticised the State Government, asking why for non-Muslims it is only RM1.1 million but for Muslims RM70 million. They make such a comparison. I think the comparison cannot be made just like that, because there are many other allocations not stated in this Budget, so I only have a little. The Government, through the Local Authorities, has also stipulated that every Planning Permission application submitted by developers to drive housing development is required to provide a RIBI site. I do not know whether the Barisan Nasional Government had such a condition, or such a policy. Here I also want to draw the attention of all the Honourable Members that from 2013 until this year, the State Government, through the PBT, the Penang Chief Minister's Incorporated (Perbadanan Ketua Menteri Pulau Pinang), the District and Land Office (Pejabat Daerah Dan Tanah) and the Penang Development Corporation (PDC), has allocated an estimated land area totalling 41.68 acres to 134 RIBI. So we see the allocation of land to RIBI as the social responsibility of a government. I hope the Federal Government will do the same.

Deputy Speaker of the HouseEN

The Honourable Member has already been speaking for one hour and 3 minutes.

Chong EngDAP · PHPadang Lalang

Sikit saja.

Satees A/L MuniandyDAP · PHBagan DalamEN

First, Kedah must learn from Penang. Don't meddle with RIBI in Kedah.

Chong EngDAP · PHPadang LalangEN

RIBI is among the groups affected by the spread of the COVID-19 pandemic, so following that, the Government provided a one-off Special Financial Assistance of RM1,000 to RIBI in Penang. Thus a total of RM925,000 has been allocated to help RIBI affected by COVID-19. So, a total of RM601,000 has been allocated to, there is 1.1 and 2.1 ya, so quite a large amount has also been given to RIBI as part of the Penang People's Assistance Package.

Deputy Speaker of the HouseEN

Thank you, Padang Lalang.

Chong EngDAP · PHPadang LalangEN

Finally, we are nearly out of time. I would like to record my appreciation to the Honourable Members who have voiced their views and suggestions for improvement on matters under my portfolio. The cooperation and support shown by all Honourable Members towards the initiatives implemented by the State Executive Council (MMK) for Social Development and Non-Islamic Affairs is greatly appreciated. My sincere thanks once again to the Honourable Chief Minister… (interruption).

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, last. Just a small request.

Deputy Speaker of the HouseEN

There is no time, Batu Lancang. Later you can ask; whatever you want to ask, you can ask outside with Padang Lalang.

Ong Ah TeongDAP · PHBatu Lancang

Permintaan, permintaan.

Chong EngDAP · PHPadang LalangEN

On the trust given and the budget allocated to the State Executive Council (MMK) for Social Development and Non-Islamic Affairs.

Deputy Speaker of the HouseEN

Batu Lancang, sit down. Batu Lancang, just sit down.

Chong EngDAP · PHPadang LalangEN

It's not that I don't want to give, but I don't have the time, okay. Sorry, okay.

Deputy Speaker of the HouseEN

Batu Lancang, sit down twice.

Chong EngDAP · PHPadang LalangEN

The support of the Y.A.B. Chief Minister for the Gender Inclusivity Policy has made him a champion of the women's agenda. Can everyone clap a little? In conclusion, I will continue my efforts and be more proactive in achieving the social development agenda. I call on all parties, whether men or women, mothers and fathers, including the surrounding community, to be more caring in playing their roles and carrying out their respective responsibilities. Remember, peace begins at home. Peaceful Families, United People, Developed State. That is all, thank you, I beg to second.

Deputy Speaker of the HouseEN

Thank you, Padang Lalang. I invite the Honourable Member for Perai.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Honourable Dato' Yang di-Pertua Dewan. Honourable Members of the State Executive Council, Members of the State Legislative Assembly, Honourable Dato' Yang di-Pertua. COVID-19, which has swept across the world, has had a major impact on the labour market. Penang State is also not spared from the spillover, where the Social Security Organisation (PERKESO) has reported that the number of workers terminated through permanent or voluntary retrenchment from March 2020 to October 2021 was 13,000 persons. Meanwhile, in terms of the labour force, the Labour Force Survey (STB) conducted by the Department of Statistics Malaysia (DOSM) reported that Penang recorded an unemployment rate of 3.5 per cent in the first quarter of 2021, and this rate continued to rise to 3.9 per cent in the second quarter of 2021. Thus this had a negative impact on the state's labour market. However, in the third quarter of 2021, the unemployment rate in Penang showed a downward pattern, where the unemployment rate fell by 0.2 per cent and recorded a value of 3.7 per cent. Meanwhile, the number of unemployed persons in Penang continued to fall marginally by 0.1 per cent, namely from 37,200 unemployed persons recorded in the second quarter of 2021 to 34,000 unemployed persons for the third quarter of 2021. This shows that, in line with the Government's decision to reopen economic sectors to operate in accordance with the transition phases of the National Recovery Plan, employment opportunities have been revived and the economy has been boosted. Not to be forgotten, the efforts of the State and Federal Governments in providing vaccines to the people of Penang played an important role in reducing COVID-19 cases. In answer to the question of the Honourable Member for Sungai Dua regarding job opportunities provided to those who have lost their jobs in Penang, particularly to local citizens, as well as the suggestion of the Honourable Member for Batu Uban that the State Government cooperate with PERKESO to expand promotion and help the unemployed obtain employment, I would like to inform that according to the MyfutureJobs portal, the total number of job vacancies in Penang State as of 26 November 2021 was 19,392. The State Government has implemented various initiatives to help Penang people who have lost their jobs, among them the State Government of Penang, through the Penang Career and Talent Assistance Centre (Pusat CAT), has implemented group job matching to help job seekers by carrying out suitable position matching upon receiving requests from employers or companies. Second, outreach to other employment agencies has been proactively carried out by Pusat CAT to understand active job opportunities to be relayed to job seekers through the website and Pusat CAT's Facebook, and this also includes cooperating with PERKESO in helping job seekers through programmes such as training, counselling, financial incentives and others. In addition, thirdly, the State Government of Penang, through Pusat CAT, has played a role in enhancing human resource development through the My Penang, My Workplace campaign, which aims to help those who have lost jobs and sources of income. Under this campaign, there were several webinar series titled Onwards & Upwards: Explore New Careers in Penang organised by Pusat CAT, participated in by companies in Penang to share information with job seekers.

The Honourable Member for Sungai Dua also asked about the issue of the unbalanced participation of urban and rural students in Science, Technology, Engineering and Mathematics (STEM) programmes. For the information of the Honourable Member, every STEM programme implemented by the agencies involved is in fact open to all schools in Penang and is carried out after obtaining approval from the Penang State Education Department (JPNPP). According to data from the Penang Science Cluster, which organised the Coding for All programme covering competitions and training for teachers, a total of 2,300 students and 430 teachers have joined these programmes. Meanwhile, based on information from Tech Dome Penang for 2021, a total of 54,000 students were involved in programmes organised by Tech Dome, namely the Women in Zcience programme, Grand STEM Challenge, Step Up, Robomania, Ahli Teknologi Muda (AI) and Penang Digital Literacy Camp. Of this total, nearly 40,000 students, or 72 per cent, were from urban schools, while 15,220 students, or approximately 29 per cent, were from rural schools. So, we can see that there is a significant difference in the participation of rural schools compared with urban schools. However, I would like to clarify here that this difference is because rural schools are usually small-sized schools, so the total number of students is smaller compared with urban schools. In addition, internet access is also among the determining factors for rural schools in joining programmes online. Apart from this, the Science and Technology Promotion Programme (PPST) is a programme that provides exposure to scientific and technological knowledge and its applications in daily life, in order to foster students' interest in pursuing careers in the fields of science and technology. This programme is open to all schools in Penang. However, to increase the participation of students from rural areas, priority is given to schools from rural areas and to students from the B40 group.

For the clarification of the question of the Honourable Member for Permatang Berangan on whether the State Government will cooperate with the private sector to create more job opportunities, for the information of the Honourable Member, the State Government always cooperates with agencies, namely through InvestPenang and the Northern Corridor Implementation Authority (NCIA), to encourage multinational companies to localise supply chains and to provide facilitation services in business matching, which indirectly creates job opportunities for local businesses. Based on investments approved in the manufacturing sector in Penang from January 2020 to June 2021, it is estimated that nearly 16,000 job opportunities will be created in Penang in phases in the coming years. As suggested by the Honourable ADUN for Permatang Pasir, initiatives by the State Government like these should be supported and given focus to ensure job opportunities can be created in the future, especially for graduates, so that the livelihood of the people of Penang State remains assured.

Regarding the suggestion of the Honourable Member for Air Itam that attention be given to traffic congestion and the movement of students at schools, since face-to-face school sessions have commenced, and the question regarding teachers' vaccination and the cooperation of the Penang State Education Department (JPNPP) in supporting State Assemblymen to make contributions to students in their respective ADUN areas. For the information of the Honourable Member, to overcome the issue of traffic congestion, the Ministry of Education Malaysia (KPM) has issued Guidelines, FAQs and 5 Pupil Dispersal Models. Model 1 relates to using waiting areas within the school compound, and Model 2 is directed and one-way routes. Model 3 recommends control of pupils' presence by the Police, Rela, Local Authorities, Parent-Teacher Association, Alumni, mothers' support groups and volunteers, namely parents and the community. Model 4 is phased pupil dispersal, while Model 5 is waiting in classrooms or a call system. According to feedback from the State Education Department, all District Education Offices in Penang have held engagement sessions with all school PIBGs under their respective districts, and all schools in Penang have chosen the dispersal model suitable for their respective schools; this information was sent to JPNPP on 18 January 2021 to be forwarded to the Ministry of Education Malaysia for further action. In addition, the Royal Malaysia Police has also deployed police personnel at locations identified as having congestion to control traffic. As for the vaccination status of teachers, this matter falls under the jurisdiction of the Federal Government because teachers and staff in schools are subject to regulations issued by the Public Service Department (JPA); however, JPNPP has already identified and managed information and data relating to officers, teachers and members of the implementing group who have not been vaccinated, including those who are not vaccinated for health reasons and those who refuse vaccines. JPNPP will ensure that all JPA directives through Service Circular No. 4 of 2021, the COVID-19 Immunisation Implementation Policy for Federal Public Service Officers dated 18 October 2021, will be fully complied with. Regarding the permission for the Honourable ADUN of the area to give contributions to school pupils, the State Education Department states that there is no obstacle for the ADUN of the area to do so, however the State Education Department and schools must comply with the School Operations Guidelines 3.0 by KPN, which still does not permit outsiders, namely members of the public, to enter the said premises. Assistance and contributions to be delivered may be channelled through the respective school PIBGs.

The suggestion of the Honourable Member for Bagan Dalam to review the existing education system and policies in order to strengthen students' proficiency in the Bahasa Melayu subject, and that this matter does not only involve National-Type Schools but also National Schools, I recommend that the Federal Government review all policies in the existing education system and take steps to improve the level of proficiency in Bahasa Melayu among students comprehensively, involving all students. The State Government will cooperate with the Federal Government on this matter. This is because the statement that proficiency in Bahasa Melayu is better among National School students is not based on solid evidence, and this should not be used as a reason to stop the operation of National-Type Schools in this country. We can see that the enrolment rate of Malay students in National-Type Schools, especially Chinese National-Type Schools, is increasing. This reflects the high standard and quality of education in National-Type Schools, so closing these schools on the ground that they do not show excellent performance is baseless.

Satees A/L MuniandyDAP · PHBagan DalamEN

Dato' Deputy Speaker, the Honourable Member for Perai asks for passage.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Yes, let me rest a bit because I need to catch my breath.

Satees A/L MuniandyDAP · PHBagan DalamEN

Regarding this issue of mastery of the national language. This is always played up as if all students of National-Type Schools are

Deputy Speaker of the HouseEN

Bagan Dalam told us yesterday, didn't he, saying you too are from a Tamil school, your language is good.

Satees A/L MuniandyDAP · PHBagan DalamEN

Wait, it is indeed played up after we raise it, even though we discussed it in this House; after that too there are still those who use the same argument. I want to ask, is the level of language proficiency, comprehension or national language among international school students, especially citizens, children or Malaysian citizen students studying in international schools throughout Malaysia, is the Bahasa Malaysia subject made compulsory for all of them, or is this Bahasa Malaysia subject only compulsory for those studying in government schools and also grant-aided schools only? This is my question: why, if they are exempted from mastering Bahasa Malaysia, they do not need to sit for Bahasa Malaysia, BM SPM why, why do we still allow international schools to operate in this country if they sideline our national language? Why are SJKC or SJKT, which teach Bahasa Malaysia, condemned, scolded, and told to close, yet if there are international schools that do not teach Bahasa Malaysia, why are they given the opportunity to do so? This is my question. That is all, thank you.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Thank you, Bagan Dalam. So I will answer this briefly. The issue of proficiency in Bahasa Melayu is an issue that needs to be heard comprehensively, and the weakness of students in Bahasa Malaysia is not in vernacular schools but in National Schools. Furthermore, the question of international schools has arisen. Many international schools have been established, and I think 40 percent, and what, local parents can send 40 percent of their children to international schools, and many politicians also send their children to schools in London, Paris and so on. So, do they comply, do they really give importance to Bahasa Melayu and so on? So I do not agree that it seems as though they feel there is a court case, many have now commented that these schools, vernacular schools, Mandarin and Tamil schools, do not allow these students to be fluent in Bahasa Melayu, have no proficiency, and therefore cannot compete with other students. I think I cannot accept that. But in my view, the mastery of Bahasa Melayu is weak across all, so we need a committee established by Parliament to study this matter, not focused only on National Schools and vernacular schools but also at the universities. The Education Act gives two (2) universities that use English as the medium of instruction. Is this commensurate with the intention, or where Bahasa Melayu is the national language? For example, Universiti Antarabangsa Islam (UIA) uses English as the medium of instruction. MARA uses English as the medium of instruction. I have no objection, as long as we do not say that

we have Bahasa Melayu, our national language, we accept it, there is no problem. We speak in Bahasa Melayu, the lingua franca. More Malaysians can speak Bahasa Malaysia, not only Bangladeshis or those from Pakistan. So, so what the problem is, is that when we look at the development of our language, we must look at it more comprehensively so that we improve the use of Bahasa Malaysia and the writing of Bahasa Malaysia. In addition, there is also English. English is a language, not my language, not my mother tongue, not the mother tongue of TKM I who is here, not the mother tongue of Satees or anyone else, but we emphasise English because it is an international language that we must master. For example, let me take the case of my office. Everyone is fluent in Bahasa Melayu, their writing in Bahasa Melayu is good. When I ask them to write in English, there is weakness. They cannot. Writing in Bahasa Melayu, when I want to write a letter to the embassy, the consulate and so on, we need to use English. So when my staff cannot draft a letter in English, Bahasa Melayu is no problem at all, their Bahasa Melayu writing is good, better than my Bahasa Melayu. So they follow the Bahasa Melayu stream. I followed the English stream in my time, so my children all followed the Bahasa Melayu stream, no problem. But why has language become a political issue after 60 years of our independence? Surely we do not accept Mandarin or Tamil, for example, my state driver sends his child to a Mandarin school. Earlier I asked him, I will not mention his name, why he sends his child to a Mandarin school. He said, YB, for my child's future. So he is a Malay descendant who sends his children to an English-language school. I think 30% of the Malay community send their children to Mandarin schools, Chinese schools, there is nothing wrong with that.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

For the information of the House, my two (2) children attend Chinese schools.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

So on this issue, I see that ordinary people, whether the Malay, Indian and Chinese communities, are more rational than politicians. They know their children's future is more assured in their view. I am not saying whether that is right or wrong, so that many of my friends from the Malay community send their children to Chinese schools. So why do we mention it, but politicians say that vernacular schools are anti-national, not fluent in Bahasa Melayu and so on. There is a court case now on this matter. But I think we want to see which language, where the language more, our society can master better for them. I hope that I know only three languages. Previously I studied French, I have forgotten everything. If I could, if I could master more languages, the better for me. So that is my view on the language issue, only do not politicise language. It is easily politicised, and we accept that we have no issue, this respect has all been resolved in our history. This issue was raised again because of politics. Where did I stop just now, okay, so we can see that the rate of participation of Malay students in National-Type Schools, especially National-Type Chinese Schools, is increasing. This reflects the high standard and quality of education in National-Type Schools, so the closure of these schools on the grounds of not showing outstanding performance is unfounded. All schools, whether national schools, national-type schools, vernacular schools, all have the best students. Whether, I am not saying that all students in vernacular schools are good and all students in national schools are not good, there are also high-quality students in vernacular schools, national schools and so on. So what I am saying is that we should adopt a more rational attitude. I will continue regarding the questions raised by the Honourable Member for Bukit Tengah on whether enforcement will be increased in the Bukit Tengah area to control the spread of COVID-19, which is mostly caused by the settlement of foreign nationals in the area, as well as the questions by the Honourable Member for Air Itam and Pengkalan Kota regarding the settlement of foreign workers that disturbs the local community. I think this matter has been raised and explained by Datok Keramat, so I do not want to repeat it.

Deputy Speaker of the House

Boleh lonjak?

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Okay, so I will go to the question of the Honourable Member for Bayan Lepas. The Honourable Member also raised the issue regarding the construction of workers' hostels in the Bayan Lepas area, which has also been answered, okay, I will skip it. The Honourable Member for Seri Delima proposed that employment opportunities for persons with disabilities (OKU), not persons with disabilities but persons with differing abilities, be given emphasis. For the information of the Honourable Member, the State Government is always concerned about the progress of the lives of the OKU group. Among the initiatives implemented by the State Government to help the OKU group obtain opportunities and employment and generate income are as follows: the Job Coaching and Disabilities Training Programme, Disability Equality Training, which is a cooperation programme between the Social Welfare Department (JKM) and other agencies such as the Labour Department, the State Health Department Office, and potential employers who can take OKU as workers. Two, the OKU career carnival organised by JKM, held to facilitate OKU individuals in finding employment to obtain announcements and job offers from prospective employers who participate in the carnival. Three, the Dual Year Exit Programme run by JKM, based on productive welfare, aimed at training and building capacity so that they can get out of the cocoon of poverty, and four, human capital development programmes, namely programmes implemented by the District and Land Office to train course participants in developing skills such as cooking or sewing. The OKU group can take advantage of these courses to increase income, whether through their own business or employment. Regarding the question of the Honourable Member for Seberang Jaya on the State Government's plans to enhance skills in the fields of science and technology to increase skilled workers from Penang, as well as the suggestion of the Honourable Member for Telok Air Tawar on emphasis on the education system to produce a workforce in line with the Industrial Revolution 4.0. As we are well aware, the shortage of skilled workers is not only an issue for the State of Penang but is also a national issue. As a long-term plan, the State Government has taken proactive steps by establishing agencies under STEM, namely the Penang Science Cluster, Creative Animation @ Cat, Tech Dome and other programmes or agencies to promote the fields of science, technology and animation in this state, because we feel we are concerned that those who take science in secondary school may have declined, the numbers have dropped, we are afraid that they have no interest in science and mathematics, so we provide programmes that can cultivate interest so that they follow the programmes from school until, or even until they leave school. These agencies

play a role in preparing students and the public with skills such as robotics and coding, and in nurturing interest in the fields of science, innovation, technology and entrepreneurship. In addition, the State Government always works together with the Penang Skill Development Centre (PSDC) in training human capital in various skill fields to meet the needs of high-technology-based industries in this state. Among the specific programmes that are the main agenda of the State Government through PSDC are in the fields of technology, machining, software, computer engineering, electronics, mechatronics, telecommunications and manufacturing technology. The State Government has provided an allocation of RM3.24 million for the establishment of Maker Labs (Makmal Pencipta) in 87 schools in Penang in 2020. Following that, in 2021, the State Government allocated RM800,600 to the Penang State Public Works Department to carry out electrical wiring works in the laboratories involving 32 schools. The Maker Lab is an initiative that provides equipment for coding, embedded systems and 3D design and printing to complement the co-curricular learning of school students in technology design and computer science fundamentals subjects, which are important skills in Industry 4.0. In addition, the State Government also plans to implement a talent development programme for Technical and Vocational Education and Training (TVET) in 15 State Secondary Schools in Penang for the year 2022. This programme is a step in addressing the shortage of skilled students in the TVET field, especially in the fields of mechatronics and precision machining. Precision Machining is estimated that a total of 250 students undergoing this TVET training will enter technical employment every year until 2024. As for the proposal of the Honourable Member for Kebun Bunga that PSDC be upgraded to a university that awards degrees to students and places emphasis on IR 4.0 and the electrical and electronics industry. For the information of the Honourable Member, PSDC is a non-profit organisation established based on a tripartite model consisting of industry, academia and government. PSDC's mission is to meet industry needs and support the need for skilled manpower in the fields of design and development, manufacturing and services in a rapidly changing business environment. Therefore, for this third point, PSDC has no intention to upgrade its status to a university and will continue to focus on meeting the needs of PSDC company members in the field of Industry 4.0. Nevertheless, PSDC will continue to work with partner universities to offer related Bachelor's Degree Programmes. In conclusion, to end my winding-up speech, once again I extend my thousand thanks to the Honourable Members who raised questions on my portfolio, namely Human Capital Development, Education, Science and Technology. I hope that with the proposals on the issues raised by the Honourable Members, they can help me and the State Government to further strengthen the implementation and direction planned in enhancing the economy of Penang, giving value to education and human capital development of this state, and empowering science, technology and innovation in daily life. Thank you. I move to support.

Deputy Speaker of the HouseEN

Thank you, Perai. I invite Pinang Tunggal to speak.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Assalamualaikum Warahmatullahi Wabarakatuh. Greetings of peace to Mr Deputy Speaker of the State Legislative Assembly, the Honourable Chief Minister, the Honourable Members of the State Executive Council, the Honourable Members of the State Legislative Assembly, and gentlemen and ladies whom I respect. First, allow me to record my appreciation and thanks for the opportunity given to me to wind up the debate and deliver the winding-up speech on issues related to this portfolio that have been debated by the Honourable Members on the Supply Bill and the Development Estimates for the Year 2022, as presented by the Honourable Chief Minister. I also wish to thank all the Honourable Members who took part in the debate and gave suggestions so that we can all together improve the State Government's planning in providing the best services to the people of the State of Penang. With full confidence, I believe the Penang State Budget 2020 with the theme "Mempercepat Pencapaian Penang2030" will bring a new breath in revitalising the economy of the State of Penang, while we continue to strive towards victory in the war against COVID-19. Dato' Deputy Speaker, I shall begin with matters relating to the State Executive Council (MMK) for Islamic Religious Affairs. As Chairman of the MMK Committee for Islamic Religious Affairs, I would like to take this opportunity to thank all parties involved for the support given to the State Government in efforts to uphold Islam as the official religion of Penang. In line with Article 5(1) of the Penang State Constitution. My highest appreciation to the state government for the commitment shown in strengthening Islamic practice in this state. The provision of RM71.13 million for the year 2022 is an increase of RM6.97 million compared to the year 2021. This is certainly very significant in addressing the welfare of all Muslims in this state. Every year, various official religious events at the State of Penang level are organised by the Islamic Religious Affairs Department of Penang (JHEAIPP), such as the Al-Quran Recitation and Memorisation Competition, Maal Hijrah Celebration, Maulidur Rasul and the Nasyid Festival, with allocations disbursed by the State Government totalling RM718,250.00 for this year. The organisation of these events is very important in commemorating important events in the Islamic calendar, as well as selecting candidates who will represent the State of Penang at the national level. The implementation of programmes under MMK Agama is also disbursed by the State Government every year, totalling RM500,000.00, to ensure that all Islamic religious departments and agencies in the State of Penang can organise programmes beneficial to Muslims. In response to the question of the Honourable Member for Sungai Dua, who asked about the complaint regarding the appointment of Mosque Kariah Committee members being postponed due to the spread of the COVID-19 pandemic. As is known, the postponement of the Kariah Election General Meeting is aimed at reducing high-risk activities at mosques. High-risk activities that may spread infection, where the transmissibility of COVID-19 is high among the community. This is because holding an Election General Meeting will surely involve large gatherings, and although there are SOPs that allow the General Meeting to be held, based on past experience most mosques were unable to enforce the SOPs effectively. Therefore, the meeting needs to be postponed to safeguard the safety of kariah members. In line with the need to postpone the implementation of the Election General Meeting of the Kariah Committee this year, the tenure of the Kariah Committee appointment

also needs to be extended to ensure the smooth management of mosques and that mosque management is not affected. The Penang State Islamic Religious Council (MAINPP) Meeting Number 4/2021 dated 30 September 2021 agreed to postpone the Election General Meeting and to extend the term of service of the existing Kariah Committee until 31 December 2022. The meeting also decided that for any Kariah Committee member who wishes to resign, the Committee may replace them with another nominee. In addition, kariah members may also nominate new replacements to fill the vacancy of the Committee. However, any proposal must be submitted to the Religious Affairs Officer at the respective District Religious Office. For the question of the Honourable Member for Sungai Dua also concerning the land for a burial ground in Sungai Dua, the State Authority, in its meeting dated 21.10.2021 and confirmed on 28.10.2021, approved the acquisition of land for that purpose and gazettement was made on 18 November 2021. The land acquisition carried out by the Seberang Perai Utara District and Land Office is expected to be completed around May 2022. In answer to the question of the Honourable Member for Sungai Dua as well, the current rate of assistance given to asnaf is based on the Had Al-Kifayah study by a research team from Universiti Teknologi Mara (UITM), Penang Branch, in 2019. This study was endorsed by the State Fatwa Committee of Penang. The amount of this assistance rate came into use in 2020. The Had Al-Kifayah study will be carried out once every five (5) years. Nevertheless, Zakat Pulau Pinang is always alert to and monitors the needs of each asnaf category according to the assistance schemes provided and also according to current circumstances. For example, the monthly financial assistance rate has been increased from a minimum of RM250 up to RM500 to a minimum of RM300 up to RM600 per month, depending on the size of the asnaf's family. Likewise, the house-building assistance rate has been increased from RM57,500.00 to RM72,000.00 effective July 2021. Other assistance schemes implemented by Zakat Pulau Pinang are the highest among the State Islamic Religious Councils (MAIN) and Zakat management bodies in Malaysia, including the Overseas Higher Education Student Scholarship, the Monthly Food Assistance Scheme and so on. In addition, medical and surgical assistance schemes are based on the cost and needs of asnaf, with the current maximum amount being RM10,000.00, as a contribution and not as a means of financing.

Thank you, Pinang Tunggal, I just want to ask one small thing. Does the Zakat side, in terms of building houses and repairing houses for asnaf, have any intention for us together to build one house complex that can accommodate asnaf groups? Start a fund or collection from zakat, so that we can build houses on land that we have.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Do you mean to make one scheme? Perhaps it is also mentioned here about a proposal being implemented at Wakaf Seetee Aishah where Zakat is involved in the construction of several houses; I will mention it when we reach that matter. The planning for the distribution of zakat assistance is based on the needs of asnaf each year through the existing assistance schemes for asnaf, and ZPP's commitment is according to the annual budget approved by MAINPP. Every increase depends entirely on the total zakat collected by Zakat Pulau Pinang each year.

In response to the questions and proposal of the Honourable Member for Pantai Jerejak, Zakat Pulau Pinang (ZPP) accepts the proposal of 'top achievers'. It is indeed being planned and studied to sponsor more outstanding asnaf children who wish to venture into critical fields needed in the job market, particularly in the State of Penang. At present, ZPP is sponsoring four (4) outstanding asnaf students to follow the ACCA Course in cooperation with MyPAC (Malaysia Professional Accounting) starting from 2019, to produce professional accountants among Muslims. ZPP has also agreed to sponsor five (5) outstanding asnaf students in this field every year. For the year 2022, ZPP will explore other critical fields for outstanding asnaf children to be sponsored using zakat funds. For your information as well, ZPP has allocated RM11 million a year for the purpose of scholarships for Muslim children of Penang who pursue studies at higher education institutions locally and abroad, and among those who benefit from this assistance are the outstanding asnaf children or 'top achievers' mentioned earlier. The Honourable Member for Bertam raised the facility of No-Record Leave for male KAFA teachers whose wives give birth. It is gladly informed that matters relating to appointment, allowances and all facilities for KAFA Teachers are under the jurisdiction of the Federal Government through the role of JAKIM (Department of Islamic Development Malaysia). This includes the Maternity Leave with full allowance for female KAFA Teachers that was announced by the Minister of Religious Affairs on 21 September 2021 in the sitting of the Dewan Rakyat and will begin to be implemented starting 1 January 2022. However, so far there is no allocation for No-Record maternity leave for male KAFA Teachers. Nevertheless, JHEAIPP will convey this proposal to JAKIM for consideration in the future.

Ex-gratia payment for KAFA Teachers. The Honourable Member for Bertam also raised matters relating to ex-gratia payments to KAFA Teachers. For your information, the ex-gratia payment for KAFA Teachers in the State of Penang is RM50.00 a month. This payment is among the lowest when compared with the additional allowances provided by other states such as the Federal Territory at RM500.00, Perak: RM200.00, Pahang: RM100.00, Johor: RM512.00 and Melaka RM850.00. The State Government will consider reviewing the amount of ex-gratia payment to KAFA Teachers in the State of Penang but subject to the financial position of the State Government.

The proposal to increase the rate of the allowance for jurunikah and to pay EPF contributions to jurunikah. The Honourable Member for Penaga raised matters relating to the increase of the jurunikah allowance and EPF contributions. For your information, Honourable Member, the Proposal Paper for Increase of the Allowance for Assistant Registrars of Muslim Marriages, Divorces and Remarriages, also known as jurunikah, has been submitted to MAINPP to be tabled at the upcoming MAINPP Meeting. Regarding EPF contributions to jurunikah. For the information of the Honourable Member for Penaga, the service of Assistant Registrars of Muslim Marriages, Divorces and Remarriages (jurunikah) is only paid an allowance of RM100.00 per solemnisation ceremony and RM1,200.00 annually, and is not eligible for EPF deductions. However, the Islamic Family Law Division, JHEAIPP is prepared to hold meetings and further discussions with the EPF regarding this matter.

The Khaira Ummah 2030 Concept. In today's climate, the challenges faced in the effort to build a quality ummah or 'Khaira Ummah' are not an easy matter. Development at the policy level needs to be strengthened properly, starting from the smallest unit in the family. The inculcation of noble values needs to be nurtured from an early age in order to produce a quality society to develop the state and nation.

Khaira Ummah 2030 is also empowered in terms of research and monitoring up to the establishment of Al-Hady Centre (AHC). Al-Hady Centre (AHC) is a manifestation realised from the Pakatan Harapan Penang Manifesto in the last 14th General Election (PRU-14). Acting as a specialised research and thinking agency for Islamic development, Al-Hady Centre helps to prepare all studies and findings to fill the agenda of the Khaira Ummah 2030 development. Al-Hady Centre is positioned under the management and administration of the Penang International Islamic College of Technology (KITAB), which also acts as the Centre of Excellence (COE) for KITAB.

In answer to the question of the Honourable Member for Permatang Pasir regarding Khaira Ummah 2030, I am pleased to inform that Khaira Ummah 2030 is in fact the strategic implementation of programmes and activities of existing Islamic departments and agencies, which is a continuation of the Rahmatan Lil Alamin mission that has already been driven by the MMK for Islamic Affairs since 2013. Various intellectual enrichment programmes for the ummah have been implemented since then, such as academic discourses, Quran months and others. In the aspect of enhancing the understanding of the Muslim ummah, Khaira Ummah 2030 under the HIKMAH pillar has planned various Islamic education programmes under the Strengthening of Islamic Education component. In efforts toward unity of the ummah, this matter has become a priority under the TARBIYAH pillar in the T3 component (Ummatic Mosque), which has seen mosques elevated to become centres for the development and unification of the ummah. So, in summary, the Khaira Ummah 2030 Concept emphasises two important aspects in the life of the ummah, namely strengthening education and revitalising mosques to play a role as community development centres.

In answer to the question of the Honourable Member for Sungai Dua also regarding the role of young people in the implementation of Khaira Ummah 2030, it falls under the Youth pillar. Three main components will be further mainstreamed, namely the Youth and Knowledge Programme, the Youth and Skills Programme and the Youth and Mosque Programme. In addition, through another State Government agency, namely the Penang Islamic Foundation (YIPP), another programme focusing on the youth group is the KAFA Menengah Programme, which is a continuation of the existing KAFA Rendah. After its initial implementation in 2019, followed by constraints in its implementation due to the Movement Control Order (PKP), the KAFA Menengah Penang Programme will only begin full operation in 2022, with implementation at 10 new mosques, making the total for next year 13 mosques. This KAFA Menengah Programme is expected to benefit more than 500 youths who are still in Daily Secondary Schools and who did not obtain a place in Religious Secondary Schools, whether SMKA, SABK or SAR.

Dato' Deputy Speaker, the Penang State Islamic Religious Council (MAINPP) is always striving to improve housing development for asnaf and B40 groups in the State of Penang. To date, MAINPP together with its agencies under it, such as Zakat Pulau Pinang and Wakaf Pulau Pinang Sdn Bhd, have developed a total of more than 600 housing units for the Muslim community in the State of Penang. In addition, MAINPP is also implementing a low-cost housing development project for asnaf groups at Wakaf Seetee Aishah (Phase 2), next to the completed Seetee Aishah Project which has shops at the front, totalling 150 units. MAINPP remains committed to expanding the development planning of waqf lands across the State of Penang for housing facilities for the Muslim community of Penang through waqf property instruments, baitulmal and zakat.

In answer to the question of the Honourable Member for Bayan Lepas regarding the projects of the Penang State Islamic Religious Council (MAINPP) that were categorised as sick. It should be explained here that at present there are no MAINPP projects that can be categorised as sick in the manner stated. Perhaps the project meant by the Honourable Member for Bayan Lepas is the two (2) projects under the Penang Islamic Foundation (YIPP), namely the Islamic Hospital Project and the International Islamic School Project, which I mentioned in answering the oral question from the Honourable Member for Penaga a few days ago. At this opportunity as well, I would like to take the chance to correct slightly the statement of the Honourable Member for Sungai Acheh, who said that PDC had already taken over the construction of those projects. I would like to clarify that PDC's involvement in the Islamic Foundation projects is as a consultant, namely as the Project Management Office (PMO) which plays a role in consultancy work and restructuring of the projects, and not as the contractor of those projects.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Dato' Deputy Speaker, I seek clarification from the Honourable Deputy Chief Minister regarding the International Islamic School that I was referring to, the sick project in question. What is its status now, and what is the plan? If I am not mistaken, this project was publicised in 2016 and until now there is nothing more. 2016 or 2014? I seek clarification, and at present there really appears to be no improvement at all to this project, thank you.

Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. RahmanPKR · PHDeputy Chief Minister I · Pinang TunggalEN

Baik, terima kasih Honourable Member for Bayan Lepas. Untuk makluman, disebabkan oleh Movement Control Order (PKP) dan juga masalah funding, pelaksanaan projek International School tersebut telah terbantut. Pembinaannya telah bermula, dan saya ingat sudah siap sampai ground beam, yang siap sampai first floor column, kalau tak salah. Jadi, pembinaan tersebut sedang dihidupkan semula oleh Yayasan Islam Pulau Pinang. Sebagai tambahan, berkaitan projek International Islamic School ini, buat masa sekarang Yayasan Islam sedang memuktamadkan perjanjian kerjasama dengan operator sekolah tersebut, iaitu sebuah operator International Islamic School di Cyberjaya di Kuala Lumpur yang menerapkan kokurikulum Bahasa Arab, Inggeris dan mengambil peperiksaan International General Certificated of Secondary Education (IGCSE). Dalam masa yang sama, pihak YIPP juga telah memohon pembiayaan kewangan daripada bank tempatan untuk memastikan pelaksanaan pembinaan dan operasi kelak berjalan lancar, Insya-Allah.

Bagi menjawab persoalan yang dibangkitkan oleh the Honourable Member for Teluk Bahang berkaitan dengan perkembangan terkini pembinaan Masjid Botanica City, dimaklumkan bahawa satu lawatan tapak telah diadakan pada 5 Oktober yang lepas selepas pihak pemaju telah mencadangkan penggantian tapak masjid yang dicadangkan, iaitu Lot 1100, Mukim 4, Daerah Barat Daya, dengan sebahagian lot berhadapan dengan lot tersebut, iaitu Lot 1102, Mukim 4, Daerah Barat Daya. Penang Islamic Religious Council (MAINPP) telah memutuskan untuk tidak menerima cadangan tersebut dan mengekalkan kedudukan asal tapak cadangan masjid di atas Lot 1100, Mukim 4, Daerah Barat Daya. MAINPP juga telah mengarahkan agar pemaju melepaskan gadaian di atas lot tapak masjid berkenaan bagi membolehkan tindakan selanjutnya boleh diambil oleh MAINPP untuk merancang pembinaan masjid baharu bagi keperluan penduduk setempat.

Saya sentuh sikit MMK Koperasi. Pemerkasaan koperasi di negeri Pulau Pinang adalah penting dalam usaha memberi sumbangan positif terhadap ekonomi dan sosial kepada masyarakat di Pulau Pinang. Menurut Malaysian Cooperative Commission (SKM) Pulau Pinang sehingga Disember 2020, terdapat 754 buah koperasi telah didaftarkan di Pulau Pinang dengan anggota seramai 155,172. Prestasi aset koperasi di Pulau Pinang telah menunjukkan peningkatan 51 peratus berbanding tahun sebelumnya dengan jumlah aset sebanyak RM874juta pada tahun 2020. Walau bagaimanapun,

prestasi perolehan menurun sebanyak 28 peratus dengan jumlah perolehan sebanyak RM169 juta pada tahun 2021. Prestasi ini didorong oleh beberapa faktor, antaranya kekangan dalam menjalankan aktiviti perniagaan sewaktu pandemik COVID-19. Sebagai sebuah negeri yang prihatin terhadap pembangunan koperasi, Kerajaan Negeri Pulau Pinang telah melancarkan Penang2030 Coop Grant pada 2 Februari 2021 bagi merangsang dan membantu ekosistem koperasi untuk lebih kompetitif dalam menghadapi norma baru. Pihak Kerajaan Negeri telah menyalurkan dana bantuan sebanyak RM450,000.00 kepada koperasi-koperasi kecil di Pulau Pinang pada tahun 2021, dan sebanyak 40 buah koperasi telah mendapat manfaat daripada program ini. Selain itu, Kerajaan Negeri Pulau Pinang juga membantu koperasi-koperasi dalam mempromosikan produk dan hasil keluaran mereka dengan mengadakan Pasar Khaira Ummah. Aktiviti ini dijalankan serentak dengan Jelajah Khaira Ummah ke masjid-masjid di seluruh pelosok Negeri Pulau Pinang.

MMK Pemerkasaan Komuniti: 375 MPKK di seluruh negeri Pulau Pinang yang ditubuhkan telah memainkan peranan yang sangat penting dalam usaha Kerajaan Negeri melawan COVID-19. Sebagai pengiktirafan, COVID-19 Green Zone Community Competition MPKK Negeri Pulau Pinang telah dianjurkan pada Ogos 2021. Pertandingan ini melibatkan penyertaan 24 MPKK terbaik dari seluruh negeri Pulau Pinang, di mana lima (5) MPKK terbaik telah terpilih bagi saringan peringkat akhir. Pertandingan ini dapat membudayakan amalan norma baru dalam kalangan masyarakat Pulau Pinang sebagai satu strategi dalam membendung seterusnya memutuskan rantaian penularan pandemik COVID-19. Kerajaan Negeri di bawah portfolio Pemerkasaan Komuniti juga telah mengambil inisiatif untuk mengadakan Takaful Kemalangan Peribadi Secara Berkumpulan (Group Personal Accident Takaful) untuk Ahli Majlis dan Ahli MPKK di negeri Pulau Pinang. Kerajaan Negeri telah melantik Etiqa Insuran & Takaful bagi menyediakan Takaful Kemalangan tersebut. Takaful Kemalangan ini diberikan kepada semua 375 MPKK sedia ada yang melibatkan seramai 5,399 ahli MPKK. Takaful Kemalangan Peribadi ini berkuatkuasa dari 1 Mei 2021 bagi tempoh satu (1) tahun. Pampasan akan dibayar kepada ahli MPKK bagi sebarang jenis kemalangan dan dilindungi dalam tempoh 24 jam. Tuntutan bil hospital boleh dituntut setiap kali kemasukan ke hospital berdasarkan jumlah bil dan maksima bayaran sebanyak RM500. Bayaran tuntutan pampasan akan dimasukkan terus ke dalam akaun penerima.

Berkenaan cadangan the Honourable Member for Pantai Jerejak supaya Kerajaan Negeri memberi sumbangan kepada enam (6) orang ahli MPKK yang telah meninggal dunia akibat COVID-19, pihak Kerajaan Negeri akan menimbang cadangan tersebut walaupun pihak Insuran Takaful telah memberi sedikit sumbangan saguhati kepada keluarga mangsa. Adalah difahamkan pihak-pihak lain juga telah turut memberikan sumbangan kepada keluarga mangsa.

Sebelum saya mengundur diri, saya ingin merakamkan setinggi-tinggi penghargaan saya kepada State Secretary's Office, State Economic Planning Unit, Management Services Division, semua District and Land Offices, Penang Islamic Religious Affairs Department, Penang Island City Council, Seberang Perai City Council, Majlis Agama Islam Negeri Pulau Pinang, SKM, semua Ahli-ahli Jawatankuasa MPKK, anggota Jawatankuasa Pembangunan Wanita dan Keluarga (JPWK), pengurusan masjid dan surau, serta semua jabatan/agensi-agensi dan institusi berkaitan yang menjalankan tanggungjawab dengan bersungguh-sungguh untuk menjayakan dan melaksanakan dasar serta perancangan di bawah portfolio saya. Semoga kerjasama yang terjalin ini dapat diteruskan pada masa-masa akan datang bagi kemajuan dan kemakmuran negeri Pulau Pinang. Sekian, Wabillahi Taufiq Wal Hidayah. I beg to support.

Deputy Speaker of the HouseEN

Thank you, Pinang Tunggal. Honourable Members, the House is adjourned until tomorrow morning at 9.30 a.m.

The House was adjourned at 4.55 p.m.