Pulau Pinang · 22 November 2022
14th Assembly, 5th session, 2nd meeting · 180 turns · 40,348 words · official PDF ↗
ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.
Absent: Dr. Hajah Norlela Binti Ariffin (Penanti), Dato‘ Dr. Amar Pritpal Bin Abdullah (Sungai Bakap), Datuk Seri Saifuddin Nasution Bin Ismail (Pantai Jerejak), Lee Khai Loon (Machang Bubuk), Gooi Hsiao-Leung (Bukit Tengah), Jason Ong Khan Lee (Kebun Bunga), Muhammad Faiz Bin Fadzil (Permatang Pasir), Dato’ Muhamad Yusoff Bin Mohd. Noor (Sungai Dua), Dr. Afif Bin Bahardin (Seberang Jaya), Zulkifli Bin Ibrahim (Sungai Acheh), Zolkifly Bin Md. Lazim (HADIR)
(Opening)
Honourable Members, Honourable Speaker of the State Legislative Assembly. Recitation of prayers.
“Bacaan Doa”
Soalan lisan.
Honourable Members, we resume sitting with oral question time. Before this, I would like to inform the House that I have received 2 notices applying for sick leave: one from Dato' Leader of the Opposition, who has informed us that he is ill and cannot attend today, and also the Honourable Member for Machang Bubuk, who has informed us that he has tested positive for COVID-19. So once again I ask Honourable Members to take precautions and follow the SOPs as best as possible, just when you want to wear face masks. (laughter) Okay, let us continue with oral question time. I would like to invite the Honourable Member for Sungai Pinang.
Thank you, Dato' Speaker. My question, Question No. 23. No. 23. The Penang State Government, through the Penang Women's Development Corporation (PWDC), has signed an MoA with Malaysia Healthy Ageing Society (MHAS) to make Penang an age-friendly city, or Age Friendly City. State: (a) What are the objectives and purpose of this initiative? (b) What implementation strategy will be used to benefit the people?
Thank you, Dato' Speaker, and also to the Honourable Member for Sungai Pinang, who asked about the Age Friendly City: what are the objectives and purpose of this initiative? The State Government launched the Active Ageing roadmap on 30 September 2022, which aims to recognise and empower senior citizens as an asset to state development, in line with the Penang2030 strategic initiative "Empowering the Rakyat to Strengthen Civic Participation". The status of achieving "Age Friendly City" is one of the initiatives under this roadmap. The State Government recognises that efforts to develop an "Age Friendly City" are extremely critical in the state of Penang, since this state will become the oldest state in 20 years' time. Therefore, to ensure it can be implemented holistically and sustainably, the framework built by the World Health Organization is more suitable to be adopted. At present, 830 cities and communities in 41 countries around the world have been recognised by the WHO as Age Friendly Cities.
To implement this initiative, the Penang Women's Development Corporation (PWDC), together with Malaysia Healthy Ageing Society (MHAS), is working to make the State of Penang an age-friendly state. This project will begin in the city of George Town under the supervision of the Penang Island City Council (MBPP). The existence of an "Age Friendly City" will encourage active ageing by increasing opportunities in the aspects of health, community participation and safety to improve quality of life along with increasing age. There are 8 domains that form the basis of the existence of an "Age Friendly City", covering the aspects of housing, transportation, social participation, civic participation and employment, communication and information, community support and health services, outdoor spaces and the built environment. This comprehensive approach will look at the needs of various levels of society so that no one is left behind, in line with the United Nations Sustainable Development Goals. The period for implementing this project is 3 years, and there are 4 main implementation strategies that will be used in carrying out this project, namely as follows: (i) conducting baseline studies to understand the current situation and identify gaps in the 8 domains through a top-down and bottom-up approach; (ii) developing indicators to reduce the identified gaps; (iii) involving various stakeholders, including the public sector, academic experts, non-governmental organisations (NGOs), as well as individuals, in identifying issues and solutions, in addition to creating a sense of ownership; and (iv) monitoring and evaluation to ensure the project is carried out exactly on the stipulated time. Thank you.
Supplementary question. Thank you to the Honourable Member for Padang Lalang. Given this strategic initiative that will benefit the people, what are the main success factors... (with permission), Key Success Factors in making this initiative a success? Thank you.
Thank you to the Honourable Member for Sungai Pinang. The Key Success Factor that is the most important is cooperation from all parties, especially the parties involved. So it involves the key stakeholders, namely mainly MBPP as project owner, this initiative, because this application is in the name of MBPP even though it is represented by PWDC. I am very proud of the commitment given by the Mayor to obtain recognition from the World Health Organization, or WHO. We have already had meetings, there have been discussions, and the MBPP side is very supportive. There is also involvement of the relevant stakeholders, namely in the 8 domains, all the Exco members who oversee these domains must give full support and cooperation, as well as the involvement of State Government agencies and departments, NGOs involved in Active Ageing, and local communities also play a very important role. So here we take an inclusive approach, we also take bottom-up, we have top-down and we also have bottom-up. So bottom-up means the communities, and all NGOs are very important. We want a whole-of-society approach.
We want all Members of the State Assembly also to be able to give, to play a very important role. I think with the cooperation of all parties, we can achieve the success of this initiative. Thank you.
Thank you. Next, I would like to invite the Honourable Member for Pematang Pasir. Permatang Pasir is not here, but I was not informed, perhaps due to election sickness too. May he recover quickly from election sickness. Next, I would also like to invite the question of the Honourable Member for Kebun Bunga, who did not even contest, also election sickness. Is Kebun Bunga here? No. The Honourable Member for Bukit Tambun, please.
Thank you, Dato' Speaker. My question, Question No. 26. No. 26. Detail the industrial development and sale of industrial land by the Penang Development Corporation (PDC) since 2008. (a) Describe the proposed new industrial areas at Batu Kawan and the related BKIP 3. (b) Detail the development of the Penang Technology Park in Bertam and state the latest status. (c) List the industrial projects that obtained Planning Permission approval from the Penang Island City Council (MBPP) and the Seberang Perai City Council (MBSP) since 2018.
Thank you, the Honourable Member for Bukit Tambun. I will answer the question of Bukit Tambun with proposals. Describe the proposed new industrial areas at Batu Kawan and the related BKIP 3. Since 2008, the Perbadanan Pembangunan Pulau Pinang (PDC) has developed 3 industrial areas, namely the Batu Kawan Industrial Park or BKIP (Batu Kawan Industrial Park) with an area of 1,151 acres, Penang Science Park (PSP) and Penang Science Park North (PSPN), each with an area of 298 acres. So far, almost 92 percent of industrial land lots in the BKIP area have been sold, followed by almost 95 percent of industrial lots in PSP, and almost 78 percent of industrial lots (PSP) have also been sold. (a) For Bandar Cassia Technology Park, with a net area of 257 acres, it has been identified as a continuation of the BKIP industrial area, which has demand from local and foreign investors. The activities planned to be located in this area are the types of industry that are encouraged, promoted industry, such as E&E (electrical and electronics), medical devices, engineering, and aerospace, aero space. The first phase of Bandar Cassia Technology Park, with an area of 113 acres, is expected to be completed in 2023. For the development of Batu Kawan Industrial Park 3 (BKIP 3) with a net area of 420 acres, the first phase of 55 acres is expected to be completed in 2024, covering the types of encouraged industrial activities as mentioned earlier, which are also promoted industries, namely E&E, Medical Devices, Engineering, Aerospace, Logistics and general industry.
(b) The second question, detail the development of the Penang Technology Park in Bertam. The Penang Technology Park in Bertam is a new high-technology-based industrial area developed by the private sector, to meet the need for industrial land following the increase in interest from foreign and local investors for the manufacturing and services sectors in this state. So far, there are three (3) industrial companies that have shown interest in investing in the Penang Technology Park in Bertam, together with their latest status, as in Appendix A, which will be placed on the Honourable Member's table after the oral question session is over. (c) Next, the list of industrial projects outside the Bayan Lepas Free Industrial Zone (FIZ) that obtained Planning Permission approval from the Penang Island City Council (MBPP) since 2018 is as in Appendix B, which will be placed on the Honourable Member's table after the oral question session is over. However, for industrial projects in the Bayan Lepas Free Industrial Zone (FIZ), Bayan Lepas Industrial Park (BLIP) and Technoplex, Planning Permission is exempted and only involves approval of the Building Plan. The list of industrial projects that obtained Planning Permission approval from MBSP since 2018 is as in Appendix C, which will be placed on the Honourable Member's table after the oral question session is over.
Terima kasih.
Thank you to the Honourable Member for Batu Maung. Here I have a question. We are well aware that Penang indeed has the highest foreign investment in Malaysia for several years, and at the same time we face a shortage of land, especially industrial land under PDC's planning. Usually, whenever there is a lack of land, PDC or InvestPenang does not refer investors, especially foreign investors, to private industrial areas. Therefore, will the State Government need to hold a coordination between PDC, InvestPenang and also private industrial area developers? That is the first question. Second, the private industrial areas, as informed by Batu Maung earlier, indeed mushroomed like mushrooms after rain, but the main problem faced by private industrial areas is that there is no specific management or management body, causing these industrial areas to be unmanaged, whatever type of industry they give to the private party, and they build without control. We only control it in terms of Planning Permission applications, but there is no control over the types of industry as we control in PDC industrial areas. Therefore, here, will the State Government intend to set up a management corporation or create a special department in both local authorities (PBT) to regulate industrial areas, like the PBTs in Pasir Gudang and also in Kulim Hi-tech? Thank you.
Thank you, the Honourable Member for Batu Kawan.
Bukit Tambun.
Batu Kawan... sorry, Dato' Speaker, yes, Bukit Tambun, because I am fresh from the parliamentary election...
Election sickness too. Okay.
The Penang Technology Park in Bertam is the first large-scale private project, as all previous industrial area projects were developed by PDC. Besides that, as mentioned by Bukit Tambun, there are indeed small light industries, indeed there are SMIs developed by the private sector, as also mentioned by Bukit Tambun regarding what control we have in terms of infrastructure development and so on. First, PDC is now also negotiating for several lands to enlarge and add to our land bank. Right now we are negotiating with status, I do not want to say anything more until, until the agreement to add to that land bank is concluded. And then PDC also recently made a visit to, the latest is in Bangkok, where we saw how the government there develops, and the private sector develops this private industrial park, where both parties cooperate: the Local Government, the Central Government and the private sector develop this private industrial park. That is why under PS (Penang Social Economy Consul Community), I was asked to chair a committee to review and improve the is of doing business, as stated in the budget speech by the Honourable Chief Minister: how we can continue to improve efforts to improve further, what is this, so that what we say is of doing business facilitates business for investors, and also improves infrastructure, where the needs of all agencies, state and central agencies, and the private sector are met. This has indeed been discussed under PS (Penang Social Economy Recovery Consul Community), the latest, and PDC will also come out with a presentation after they have made a visit to Bangkok recently, and several other states mentioned earlier, Johor, proposals to improve the management of industrial parks, whether private or new buildings, are still under consideration.
Thank you. I would like to invite the Honourable Member for Batu Lancang.
Dato' Speaker, my question is number 27. No. 27. What is the annual ratio of public transport usage compared to private vehicles since records were kept? (a) What measures has the State Government taken to increase the reliability and connectivity of public transport to encourage more Penang residents to shift from private vehicles to public transport to reduce traffic congestion?
Thank you, Dato' Speaker, and thank you to the Honourable Member for Batu Lancang. Honourable Member, based on records from Rapid Penang regarding passengers or ridership using only Rapid Penang public buses, as of September 2022 the usage percentage is 2.64 percent. This rate shows an increase compared to 2020, which was 2.07 percent, and 2021, where it decreased to 1.23 percent due to the COVID-19 pandemic. However, this rate is still lagging behind the record in April 2019, before COVID-19, where the recorded percentage was 4.47 percent. (a) Among the measures taken by the State Government, in cooperation with Rapid Penang, to increase the reliability and continuity of public transport to encourage more Penang residents to shift from private vehicles to public transport to reduce traffic congestion are: (i) allocating subsidy funding for the implementation of public transport programmes such as the My50 Mutiara Pass, the CAT Bridge free bus, the CAT George Town free bus, the BEST Komtar bus, and also financing ferry fares for Malaysian citizen pedestrian passengers; (ii) working with public transport operators such as Rapid Penang to provide a network of stopping bus services throughout the State of Penang with the most optimum service; (iii) improving public transport services by increasing efficiency, comfort, and also upgrading infrastructure facilities such as terminals, hubs and bus stops; (iv) providing an annual allocation through PBTs for the construction and maintenance of public transport facilities such as bus shelters, stop signboards and so on. New covered bus stops are built every year through government allocation and also sponsorship from the private sector; (v) implementing an Integrated Regional Public Transport System centred at Penang Sentral, involving various modes of public transport; and (vi) lastly, establishing an integrated public transport stopping network in every area, such as at the Bukti Mertajam hub, Bayan Baru hub and Bukit Jambul hub. Thank you, Honourable Member.
Thank you. Yes, please go ahead.
Supplementary question, Dato' Speaker. Does the State Government intend to build mass transit lines in areas that people visit frequently, such as residential areas, shopping centres, public facilities such as libraries and university gardens, and so on? Second question, how will the State Government ensure that the operation of a mass transit system such as the LRT, where the Penang Transport Masterplan is concerned, is sustainable in the long term without burdening the State Government?
Thank you, Honourable Member, for your supplementary question. Firstly, the State Government does have a long-term plan to build a transit system route through areas with high population density, among them by constructing an LRT system, or Light Rail Transit, with the first line running from Komtar to Bayan Lepas. It will pass through popular public places such as Komtar, Bandar Sri Pinang, Jelutong, USM, Batu Uban, Sungai Nibong, Sungai Nibong Bus Terminal, Bayan Baru and the Free Trade Zone. The Bayan Lepas LRT route will be 26.8km long and will have 23 stations, and 5 park & ride facilities will also be built to encourage people to use the transport system. For the Honourable Member's second question, on the feasibility of the LRT project: the construction of the LRT will be carried out through an open tender, in which we will implement an RFP (Request for Proposal). The pre-qualification invitation process has already taken place and ended on 7 October 2022. After evaluating all the interested bidders, the official invitation to the companies that have been shortlisted will take place at the beginning of 2023. The State Government will then evaluate and scrutinise the proposals from those companies and take into account their experience, technical expertise and the financing module they propose for implementing the LRT project. This is to ensure the feasibility of the project in the long term so as not to burden the State Government. That is why we have also asked for a funding mechanism to be proposed, because it is rather difficult for us to take funds out of the State Government. Thank you.
Thank you. I will now invite the next question. The question from the Honourable Machang Bubuk, as is already known, is on quarantine leave. The question from the Honourable Batu Uban, please.
Dato' Speaker, my question is question number 29. No. 29. Cases of child abuse. (a) What is the total number of recorded cases of abuse and the types of abuse by district for the period of the year 2022? (b) What immediate action and support has been provided by the State Government to victims of abuse? (c) What are the factors and causes of child abuse occurring?
Thank you to the Honourable Member for Batu Uban for asking the question on cases of child abuse involving children. The total number of recorded cases of abuse from January to September this year, by type of abuse and based on the districts SPU, SPT, SPS, Timur Laut and Barat Daya, is in total, for this period, this month, 209 cases. So from this we can see that every day there is at least one case reported, and there are more that are not reported. The types of abuse are physical, sexual, emotional and neglect. In SPU there are 21 cases in total, SPT 97 cases, the highest in SPT, and SPS 14 cases, TL is 58 cases and Barat Daya is 19 cases. The highest of all is sexual abuse. The highest is sexual abuse at 91, the overall total is 91. The second type is neglect at 67, and physical at 42, emotional 9. So for physical: SPU - none, SPT - 14, SPS - 3, TL - 19, BD - 6. Total 42. Sexual: SPU - 20, SPT - 30, SPS - 2, TL - 29, BD - 10. Total 91. Emotional: SPU - none, SPT - 5, SPS - 3, TL - 1, BD - 0. Total 9. Neglect: SPU - 1, SPT - 48, SPS - 6, TL - 9, BD - 3. Total 67. The Social Welfare Department (JKM) always provides immediate action and support to victims in accordance with the SOP, the department's Standard Operating Procedure, as follows: (i) Rescuing the child within 10 hours after a complaint or information relating to abuse is received; (ii) Taking the victim to hospital to receive proper treatment if necessary and upon confirmation by a Medical Officer that abuse has occurred; (iii) Interim orders under Section 19, Child Act 2001, and permanent orders under Section 30 of the Child Act 2001 will be obtained from the court to place the child under the care of a suitable and appropriate person or in a safe place; and (iv) Advisory services and counselling intervention.
In addition, the Child Protection Team appointed under Section 7 of the Child Act 2001 also plays a role in implementing advocacy programmes on child abuse at the local community level. What are the factors that cause child abuse? The factors are financial problems, negligence of parents/guardians/caregivers, the abuser being involved in crime, hyperactive children, cyber influence, health problems of parents/guardians/caregivers, children following boyfriends, and peer influence. That is all, thank you.
Terima kasih.
Honourable Padang Lalang, I feel that the trend of sexual abuse is increasing, it is said there are 91 cases, so what action is the State Government taking, especially since we have the JPWK under every KADUN, what programmes can we carry out or how can we reach the victims or rescue these victims? Thank you.
What the JKM does is intervention, or trying to help once this has already happened. But in the State of Penang, we at PWDC want to prevent it, so we do a lot of prevention, for example awareness. For example, every year we hold Penang Goes Orange. That is awareness to reduce violence against women and children. And we have a policy called the Safe Family Policy. The Safe Family Policy is to raise awareness that abuse is wrong under the law, and also to increase support for families like these, families experiencing violence, and especially for the victims. And we also have the PKW, the PKW is the Women's Service Centre supported by the State Government. They run a programme called 'Ok tak Ok' in schools or in the community to teach parents or children what touch is 'ok' and what touch is 'not ok', so that children know, if it is a 'not ok' touch, how they can, how they can seek help or how to tell? So that they can get out from there. Or how to escape from such touch. And I also hope that education, the Ministry of Education, will hold more programmes in schools because it is difficult for us to reach out to such children. If we run programmes in schools, all schools are taught, all children are taught, so children can also know how to protect themselves. There is a lot more we can do. So I also hope the JPWK can run more programmes.
So I also, I also call on all Honourable Members to run programmes like this at the Penang2030 Centres in their respective areas. That is all, thank you.
Thank you. I will now invite Pulau Tikus. Please.
Dato’ Speaker.
Pulau Tikus.
Thank you, Dato' Yang di-Pertua. My question is number 30. No. 30. What is the State Government's plan to coordinate government agencies to ensure that infrastructure upgrading projects and drainage and stormwater systems such as drains and ditches throughout the State of Penang can be carried out smoothly without confusion in terms of jurisdiction, expenditure and maintenance?
Thank you, Dato' Speaker, and thank you, Pulau Tikus. Honourable Member, in ensuring that infrastructure upgrading projects and drainage and stormwater systems such as drains and also ditches throughout the State of Penang can be carried out smoothly without overlapping jurisdiction, expenditure and also maintenance, the State Government has established an Infrastructure Coordination Committee among the State Government departments and agencies in Penang in 2019, which I myself chair. The membership of this committee comprises the Deputy State Secretary (Development) and the Senior Assistant State Secretary, Local Government Division, as Secretary or Committee Secretariat, and the committee also consists of the BPEN, the State Finance Department, the Land and Mines Office, the Town and Rural Planning Department or PlanMalaysia, the Public Works Department (JKR), the Irrigation and Drainage Department (JPS), the Malaysian Highway Authority Northern Region, MBPP, MBSP, the District and Land Office for all five districts, and therefore the committee, and apart from that the committee is also made up of all the District Engineers of JKR and JPS. Accordingly, this committee was established as a platform to coordinate the duties and responsibilities of State Government departments and agencies in Penang in relation to maintenance work, alongside fostering cooperation and subsequently resolving arising issues promptly as needed. The maintenance expenditure allocations concerned will be coordinated by the agencies involved, using existing allocations, whether from the Federal Government, State Government or PBT. Meanwhile, the State Government has also established the Guidelines for Determining Responsibility for Maintenance of Roads, Drains, Trees and Landscape by Government Agencies and Departments in Penang, as follows, to be implemented by all departments and agencies involved in infrastructure maintenance throughout the State of Penang. These guidelines are prepared to help the State Authority, local authorities and implementing agencies to ensure there is no overlap in the maintenance of roads, drains, waterways, coastal land and others covering government assets in terms of cleaning or maintenance. Thank you, Honourable Member.
Soalan tambahan.
Sila.
Thank you, Honourable Tanjong Bunga. I would like to ask, in situations that often happen when the Federal Government and State Governments are governed by opposing political parties, what methods can the State Government consider to speed up matters when an infrastructure issue, an infrastructure problem, is, let's say, very, it's an emergency situation, like weather issues like this, or if an infrastructure is not done as quickly as possible, it will slow down other infrastructure issues? Thank you.
Yes, thank you. In an emergency situation, Honourable Member, normally a decision will be made if the asset belongs to the Federal Government, for example. However, because it is very urgent and there is an emergency that requires it, for example immediate repairs or temporary repairs, in such circumstances the State Government will usually take action, and if the Federal Government cannot take action immediately. We have, there have already been several examples when that has happened. It is not a problem. The most important thing we want to protect is that safety becomes the priority. Thank you, Honourable Member.
Sila.
Thank you. On this occasion I would like to ask Honourable EXCO, to what extent has the leniency been given for us to use MARRIS allocations, since we were previously informed by the previous government that there was leniency to use MARRIS allocations. So what is the situation?
There has been some leniency in the past few years. And the most notable is after the major flood in the State of Selangor. In 2019, last year, right? Just last year. After that, the Federal Government relaxed the MARRIS conditions to allow us not to use upgrading work but to enlarge drains and ditches for the purpose of preventing floods. So, before that, MARRIS could not be used for enlarging drains. It could only be used for repairs to the original specification, but with this leniency, it can be used for flood mitigation purposes. Thank you.
Thank you. And the next question is from the Honourable Seberang Jaya. Seberang Jaya is not here, suffering from election fever again. I wish a speedy recovery. I will invite the Honourable Air Itam, please.
Thank you, Dato' Speaker. My question is question 32. No. 32. Cases of being crushed by fallen trees during storms are unforeseen events. (a) State the procedure for members of the public who suffer losses and injuries from being struck by roadside trees supervised by the State Government to obtain compensation from the government. (b) Also list the amount of compensation that has been paid by case and the total amount.
Thank you, Dato' Speaker, and to my colleague from Air Itam. As we can see, this morning I have 23 questions, but three have been skipped. They were skipped not because of a health issue, but skipped because there is no health issue, such as question 31 from Seberang Jaya, where is he? He must answer to his constituents, that is the duty of the State Assembly, our duty. I am ready to answer all the questions, but we see that there are those who are not willing to come and see the fate of their people in their areas, that is not right...(disturbance).
Cukup?
Okay I will now answer. Thank you very much, thank you to the Honourable Air Itam. Of course we see this as an unforeseen matter, Dato' Speaker, regarding cases of trees that have been crushed and uprooted during storms, and I will also answer the next question, which is the compensation that we have given for these cases. Dato' Speaker, this incident during storm conditions is, like I said just now, completely unforeseen. My answer is that it is the result of the effects of climate change, but I want to state that this is not the effect of climate change, this is the effect of a climate crisis. It is a climate crisis not here in Penang, not here in Malaysia, but throughout the world, and we need to see how we can deal with it and we are looking at it across all our agencies. So both Local Authorities always ensure the maintenance of trees located on the road shoulders at all times to ensure there are no such cases, Dato' Speaker. Now, members of the public who suffer losses and injuries from such incidents, we will look into it and always pay attention, Dato' Speaker, and for your information to my colleague from Air Itam, the compensation, Dato' Speaker, that has been paid by MBPP so far is RM223,185.00 for nine (9) cases, and for MBSP, on the part of MBSP we have paid RM2,721.00 for five (5) cases, Dato' Speaker. Thank you, thank you.
Terima kasih
Supplementary question, thank you. For your information, last year we were shocked by an incident where a coconut fell on a person's head by the roadside. The issue went viral and became a major issue, and when that incident happened, immediate action was taken to remove all the coconut trees along that road. However, after that incident I applied to MBPP to take action on trees that we think are at risk of danger, but unfortunately until now there has been no response from MBPP. Are we going to wait for this to happen again before we act? Thank you. Secondly, I want to ask about a tree that fell in a village area blocking a village road. Recently this happened in Sungai Batu, when we asked the unit for help, the tree was quickly felled and cut into pieces, but the remaining trunk pieces were left at the villager's house. When asked whose responsibility it was, the Landscape Unit said it was the responsibility of the homeowner. So please explain whether MBPP is responsible for removing it or is it really the homeowner's? The homeowner does not have the money to remove the timber, thank you.
Thank you to my colleague for the question raised earlier, where I have already given an explanation that we are monitoring all places where we have trees. Of course your question is about a fallen coconut tree, but I want to state that throughout the State of Penang we have thousands of trees that are also heritage trees. So we are indeed always monitoring and always carrying out work to inspect all these trees by both of our City Councils to ensure they remain alive, and of course in places where there are problems when we are informed, we will take the necessary action. That is all, thank you.
Thank you. I will now invite Pulau Betong. Pulau Betong has no question either, so it will be skipped and I will invite question 34. Honourable Member, please.
Thank you, Honourable Dato' Yang di-Pertua. The question from Pengkalan Kota is question 34. No. 34. Supply of affordable housing by the State Government. (a) What is the performance of the Federal Government in supplying affordable housing in Penang? (b) What is the status of construction of the Rakyat Housing Project (PPR) in Penang that should have been provided by the Federal Government?
Thank you, Dato' Speaker, and also to my friend from Pengkalan Kota for an issue that is very close to my heart, namely housing. It is a question on the supply of affordable housing by the State Government and our performance compared with the Federal Government previously, where we are waiting to see what will happen, and also the current status of the construction of the People's Housing Project (PPR) that should already have been built by the previous Federal Government. Dato' Speaker, I want to try to be brief, but this issue is so important that all the people of the State of Penang should be reminded that in Penang our priority is to ensure there is sufficient supply of affordable housing for the people of Penang, and that is our first agenda in our most important document, the Visi Pulau Pinang 2030 (Penang2030). It is our first chapter, Dato' Speaker. For your information, and I want to state that originally our target for the various affordable home units (Rumah Mampu Milik) was 200,000, but after discussion with the Chief Minister, when we saw that there was a very large response for affordable home units, we increased it to 220,000 units, Dato' Speaker. And so far we have achieved, Dato' Speaker, 62.9 per cent, that is, we have achieved 138,545 units of various affordable home units in Penang. That is our achievement, and for everyone's information, in the overall achievement, we have units that have been built, that are being built, and that have been approved for construction. We have also, I want to state, made a policy decision in the State of Penang, because we know we have a problem with people's access to low-cost housing, and so we made the decision, Dato' Speaker. Let me just explain: to diversify access to affordable housing through the rent-to-own scheme, and I am happy to state to everyone that we have now achieved nearly 3,600 rent-to-own units, where our target is 10 per cent of the 220,000 various affordable home units, and we will achieve it because we took only one year to do it, and we have achieved it, and that is the difference between us and the Centre, to answer my friend from Pengkalan Kota. We also, Dato' Speaker, unlike other states in Malaysia, will not increase the controlled prices for low-cost houses and lower-middle-cost houses, where we will ensure they remain maintained, Dato' Speaker, at RM42,000 for low-cost houses or RMM A, and RM72,500 for RMM B. And also, for your information, just a little bit of explanation, Dato' Speaker, we have RMM C, that is, affordable homes where in Penang, at the beginning, we had a ceiling price on the island of RM300,000 and on the mainland of RM250,000, but in Penang we are caring and we have reduced that RMM C by 10%, Dato' Speaker. Now it is RM270,000 on the island and RM225,000 on the mainland, and that shows what we can do in the State of Penang, and we will continue to do so, Dato' Speaker. Of course I appreciate your question from Pengkalan Kota about what was done regarding the PPR by the previous Federal Government. Now, for your information, the People's Housing Project (PPR) is a federal project, and what happened is that we provided the land,
and in Penang, as I have stated many times and repeatedly, we have indeed identified, Dato' Speaker, five (5) pieces of land totalling 73 acres for them to see how they could build this PPR in Penang, but unfortunately, Dato' Speaker, unfortunately, the previous Federal Government failed to respond, did not even come to look at the land. So we want to see what will happen with the new Federal Government, but in any case, in the State Government of Penang, if they cannot do the work, if they fail, if they are lazy, negligent in their responsibilities, we in the State Government of Penang will do it, and I give that promise and that commitment, because that is what we want to do and we have that plan. Thank you, thank you...
Terima kasih
Supplementary question. Thank you, Honourable Dato' Yang di-Pertua. Thank you for the answer given by the Honourable Datok Keramat, which was very thorough, especially on this housing issue, but I always remember that when the Honourable Datok Keramat raised the matter of former Housing Ministers in Kepala Batas, in Kota Belut and in Ampang, they all failed. So my question is actually directed at the development of the People's Housing Project (PPR), where according to the answer given by the Honourable Datok Keramat, indeed the State Government has always been committed and has even provided land for the development of this People's Housing Project. So my question is whether that commitment will continue, never mind who will form the Federal Government this evening, whether the State Government's commitment will remain the same, where we will provide this land for the purpose of PPR development. Thank you.
Thank you. I have two matters to state. The first is that since the Housing EXCO came into being in 2013, I will now see the fifth Housing Minister. That is what has happened, which has caused us not to be able to continue our efforts, because there have been changes that are so rapid. Like I said, they change governments and change ministers like changing clothes. That cannot be done, because we need consistency so that we can continue our obligation to do the work. That is what we want to do. First question I answer. It is very shaming, Dato' Speaker, if I can say it, that it is the fifth housing minister that I will see, secondly of course, as was asked earlier by my friend from Pengkalan Kota. Thank you. We are committed. We now have many and varied plans with the Penang State Housing Board, not only for affordable housing, which we will begin at the end of this year, the first, and also the renewal, for which we have already started the process for an RFP, and which we hope we can begin. The question regarding the PPR. I have already answered it earlier. If they cannot do it, we will commit to doing it ourselves, and we also have plans for that.
Thank you, Honourable Member. Bertam? Has it left? There is no one in the House, so the question is skipped. The Honourable Member for Jawi, please proceed.
Thank you, Dato' Yang di-Pertua. My question is Question No. 36. No. 36. What initiatives have been taken by the State Government to rebuild investor confidence in BKIP2 following the fire incident at the Waste Disposal Site? (a) What is the current status regarding management at the site?
Thank you, Dato' Speaker. To my friend from Jawi regarding the initiatives taken, Dato' Speaker, can we give confidence to investors in the Seberang area following the fire incident at the solid waste disposal site, and what is the status now? Thank you very much for the question. The State Government's initiative to rebuild investor confidence in BKIP 2 is by starting the rehabilitation process, or Phase 1 Rehabilitation of the Pulau Burung Solid Waste Disposal Site, in order to reduce the risk of pollution and fire. We at MPPP and also MBSP have, for everyone's information, terminated the concession with the previous operator in August 2022. For everyone's information also, Dato' Speaker, the Pulau Burung Solid Waste Disposal Site (TPSB) Phase 3 is now being operated by ourselves, namely MBSP, since the termination of that concession, and MBSP still practises the method of land filling at TPSB, with the intake of waste of Dato' Speaker, between 2,100 and 2,400 tonnes a day. Long-term planning for TPSB is also being studied by us to ensure we can secure the latest technology. That is the most important thing. We have moved so much for work, the whole world has moved so much forward in terms of management, and we want to look at the best methods, Dato' Speaker. The State Government is now in the process of preparing the RFP (Request For Proposal) documents for the development and operation of TPSB, by establishing, as I have stated, the best technology for solid waste treatment. We are considering various methods that are more reliable for us; what is needed is a method, one of which has already been working, Dato' Speaker, with energy, and we are looking at where there is a method, Dato' Speaker… (with permission). Thank you.
Thank you. Please proceed.
Thank you, Dato' Speaker, for giving the opportunity to the Honourable EXCO. Regarding the fire at the waste disposal site, has the State Government studied any alternatives other than landfill for disposing of waste in the State of Penang, because we see that landfill takes up a great deal of space and also carries a risk of fire due to the release of gas and so on? Are there any alternatives apart from this, Honourable Member, that can generate income for the State Government too, such as biogas plant, something of that? Thank you.
If you follow, we have already read the long answer just now. Waste to energy. Seri Delima.
Thank you, Dato' Speaker. My question is Question No. 37. No. 37. What actions are being taken to reduce traffic congestion, especially at Jalan Masjid Negeri and Jalan Scotland, especially during peak hours? The existing traffic flow is less effective and the people need alternatives urgently.
Thank you, Dato' Speaker. Thank you to the Honourable Member for Seri Delima, regarding the specific question, namely to reduce traffic congestion at Jalan Masjid Negeri and Jalan Scotland during peak hours, where the existing traffic flow is less effective. Dato' Speaker, I would like to state briefly that this is an important question, because when we talk about traffic, I have stated that as a state where everyone wants to come, that is a problem. So the State Government, Dato' Speaker, is indeed concerned about traffic congestion, specifically as stated by my friend from Seri Delima. Where during peak hours there is indeed traffic jam congestion at areas such as Masjid Negeri and Scotland Road. So the road situation for both roads in the morning and also in the evening, for the information of Dato' Speaker, has exceeded capacity, which causes traffic congestion in the area, and the factor is that we see a narrow road condition and also there are many places such as schools in those areas that were mentioned by my friend earlier. So what we want to do, Dato' Speaker, is that through MBPP we have already taken, and are taking, several actions to reduce that traffic congestion. Among them, Dato' Speaker, are: (i) we have already made traffic light coordination at the junction of Jalan Scotland and Jalan Batu Gantung by adding green phases for vehicles on Jalan Scotland; (ii) coordinating traffic lights along Jalan Masjid Negeri to create a green wave flow on Jalan Masjid Negeri; (iii) carrying out road widening works on Jalan Masjid Negeri and upgrading the junctions in the surrounding areas; (iv) installing CCTV to enhance traffic monitoring security and control that congestion, and this CCTV also, Dato' Speaker, under my portfolio, to ensure we are a smart state, we are upgrading the existing CCTV. Across the whole State of Penang we have already reached nearly 1,200 units. Where we want to use the CCTV with a video analytics system, where we can see faces and identify people who commit offences, or look at vehicles that commit offences, and that is what we are upgrading. (v) We also, Dato' Speaker, are implementing a one-way system in the areas where congestion occurs; and (vi) finally, Dato' Speaker, we will also continue to carry out enforcement actions by both of our local authorities (PBT). Thank you.
Thank you. I would like to invite Permatang Berangan. Please, Honourable Member.
Thank you, Dato' Speaker. My question is Question No. 38. No. 38. The progress status of solutions to traffic and congestion problems on main roads and junctions around Tasek Gelugor. (a) Please detail the position and progress of the study on the need to solve traffic and congestion problems around Tasek Gelugor. (b) What is the State Government's plan in addressing traffic congestion and the frequency of accidents on main routes?
Thank you, Dato' Speaker, and thank you to my friend from Permatang Berangan for his question, which concerns the progress in resolving traffic and congestion on the main roads of Tasek Gelugor, and what our plans are for the future. To resolve the traffic and congestion problems on the main roads and junctions around Tasek Gelugor, we, through MBSP in the area of Majlis Bandaraya Seberang Perai (Seberang Perai City Council) and the Public Works Department (JKR) Penang, and various developers, have already taken several actions, some of which have been completed, Dato' Speaker: (i) Installing traffic lights at the junction of Jalan Pokok Tampang, Jalan Tasek Gelugor and the junction of Jalan Kubang Kubang Menerong and Jalan Tasek Gelugor; (ii) Installing push-button traffic lights for pedestrian crossings on Jalan Padang Menora near Masjid Lahar Yooi in Tasek Gelugor; and (iii) Installing pedestrian crossing traffic lights on Jalan Kubang Menerong in front of Sekolah Menengah Kebangsaan Bakti in Tasek Gelugor. 9i) We also have other proposals that we are looking at and studying, namely in the first plan, Dato' Speaker, are the proposals (i) Installation of traffic lights at the junction of Jalan Tasik Gelugor and Jalan Gelugor; (ii) Proposed installation of traffic lights at the junction of Jalan Pongsu Seribu and Jalan Permatang Indah; (iv) Proposed installation of traffic lights at the junction of Jalan Gelugor and Jalan Permatang Berangan; (v) Proposed installation of traffic lights at the junction of Institut Kemahiran Mara Seberang Perai Utara; (vi) Proposed installation of traffic lights at the junction of Jalan Telok Ayer Tawar to Tingkat Laksamana 8; (vii) Proposed construction of a bridge linking Jalan Kubang Menerong with Jalan Tok Bedu; (viii) Proposed construction of a bridge linking Jalan Merbau Kudung with Jalan Guar Jering;
(ix) Proposed widening of Jalan Kubang Menerong from the junction of Jalan Gelugor to Jalan Kampung Baru Kubang Menerong; (x) Proposed widening of Jalan Pongsu Seribu from the Taman Kostum junction to Taman Alamanda; (xi) Proposed widening of Ara Kuda from the Jalan Lunas junction to Kampung Desa Puri; (xii) Proposed widening of Jalan Lunas from the Ara Kuda junction to Taman Desa Ara; (xiii) Proposed widening of Jalan Telok Ayer Tawar from the Jalan Bayu Aman junction to Tingkat Laksamana 8; (xiv) Proposed widening of Jalan Teluk Ayer Tawar from the Jalan Bayu Aman junction to Jalan Tuanku Putera; (xv) Proposed widening of Jalan Gelugor from Sungai Kereh to the Jalan Pokok Sena junction; (xvi) Proposed construction of a 100-foot road from the Jalan Gelugor junction to Jalan Tun Hamdan Sheikh Tahir; (xvii) Proposed installation of traffic lights at the junction of Jalan Nyior Sebatang and Jalan Lebuh Banting in Seberang Perai Utara; (xviii) Proposed change of traffic flow from two-way to one-way in Pekan Sungai Dua involving Jalan Seri Murni, Lorong Machang, part of Jalan Sungai Dua and part of Jalan Merbau Kudung. We are also looking at and studying the position and conducting research on the need to resolve traffic and congestion problems around Tasek Gelugor. There are several studies that I want to state, Dato' Speaker, that are being carried out, namely the Traffic Impact Assessment (TIA) study in Pekan Sungai Dua, which we have already approved at MBSP. We also have another TIA study on Jalan Kubang Menerong, where we have proposals for traffic improvements there by the developers, which will be required when the CCC (Certificate of Completion and Compliance) is issued. We think we also have another TIA study on Jalan Ara Kuda and also Jalan Lunas, which has also been required in the planning permission for developers when their projects are completed. Also, another TIA study, Dato' Yang di-Pertua of the State Legislative Assembly, on Jalan Telok Ayer Tawar from the Jalan Tunku Putra junction to Tingkat Laksamana Lapan, which we have also required for planning permission to be reviewed before the CCC is issued. One more thing, Dato' Speaker, the TIA study on Jalan Gelugor, from Sungai Kerih to Pokok Sena, where we have also already required it in the Planning Permission. We will always be concerned, and I am giving a detailed account of what we have done, and we will continue to do so, not only in the Seberang side but also in the island side, Dato' Speaker. We have many short-term and long-term measures, which I believe I will inform my friend about. If we cannot allow others to ask questions too, but it's all that, we are working on it. We will always look at and be concerned about this problem. Thank you.
Thank you, please.
Thank you, Dato' Yang di-Pertua, thank you, Datok Keramat, for the explanation regarding question 38 that I raised. My supplementary question concerns the additional traffic areas that still arise and still experience peak-hour congestion problems and also the frequency of accident risks, namely the Tasek Gelugor T-junction, the Kampung Tok Bedu junction, the Pokok Tampang junction to Lahar Yooi and Padang Menora, and the Kampung Aman junction to Jalan Pokok Sena. So these four roads and routes often experience peak-hour congestion and also accident risks, which frequently occur; once at the Tok Bedu junction there were four (4) accidents in a single day. So residents around there often raise traffic problems there, and my question, apart from the answer provided by Datok Keramat just now, is: What is the simplest or fastest short-term alternative to be implemented to overcome this problem while waiting for the actions taken earlier, whether upgrading the status or any alternative routes as well? How can immediate action be taken, apart from educating drivers and road users to practise safe driving? Thank you.
Thank you very much. Thank you, Dato' Speaker, and my friend from Permatang Berangan. Thank you. I think my answer has indeed touched on the efforts we are undertaking, the actions that are taking place, so it's an ongoing process, and it indeed answers the concerns and worries from Permatang Berangan, who always cares for the people in his area, where we will speed up those processes. But if there are any actions or methods that we can speed up, we are indeed studying them as I answered just now, Dato' Yang di-Pertua of the State Legislative Assembly. Thank you, thank you very much.
Thank you, I would like to invite the Honourable Penaga, please.
Thank you, Dato' Yang di-Pertua, my question is question number 39.
No. 39. When and how many times has flash flooding occurred at Penang International Airport (LTAPP) from 2017 until now? (a) What measures have been taken to overcome it? (b) How many flights have been disrupted because of it? (c) The situation will get worse if the airport is enlarged. Is the enlargement of LTAPP relevant?
Thank you, Dato' Yang di-Pertua of the State Legislative Assembly, and thank you, the Honourable Penaga. Based on the records of Malaysia Airport Holding Berhad (MAHB),
Lapangan Terbang Antarabangsa Pulau Pinang has experienced serious flash flooding three times since 2017. Namely on 28 October 2018, 3 September 2019 and also the most recent on 24 September 2022. To overcome the flooding incidents, MAHB has implemented several measures, including building two On Site Detention (OSD) tanks in 2015. The OSD tanks, with capacities of 264 cubic metres and 190 cubic metres, were designed based on the rainfall received by the airport catchment area, which is around 30 to 40 mm per hour. The OSD acts as a buffer reservoir that stores surface runoff during rain and releases it into the open drainage system after the rain stops. The construction of the OSD can prevent flooding in several areas of the airport. MAHB also upgraded the pump system in the turboprop aircraft apron area and raised the floor level of the terminal building in that area in 2018. This has proven effective, as after this project was implemented, the area is no longer inundated during heavy rain. Then in 2019, MAHB built another OSD tank with a storage size of 1,200 cubic metres, which is indeed very big. This OSD was built concurrently with the multi-storey car park project. This project has been completed, the construction of the OSD was completed in September 2022. However, MAHB is currently in the process of planning the flow of rainwater from the drains into the pump sump and then from the pump sump directly into the OSD tank. What this means is that the latest MAHB built a very large OSD tank, underground, actually under the open car park, of 1,200 cubic metres, and then, although it has been completed, it still needs a connection from the place that is flooding. The water needs to be channelled into the OSD, and the construction is ongoing and is expected to be completed and ready for use by the first quarter of 2023. I myself have visited the site and seen the progress of the construction. For the long-term plan, MAHB is in the process of designing a larger OSD tank to accommodate high-intensity rainfall. This plan will be included in the enlargement plan of LTAPP prepared by MAHB. The long-term solution taken by the State Government through JPS is the implementation of the RTB project, namely the RTB Sungai Tiram at Kampung Naran, as well as through the allocation of a high-impact project to reduce the risk of flooding around the airport area. To answer the Honourable Member's second question, no flights were affected by flooding in the terminal area because the flooding only occurred in the terminal area. The airport was also not closed due to the flooding incidents, and flight operations continued as usual. Finally, the Honourable Member's question: to support economic development in Penang and the yearly increase in the number of passengers, enlarging the airport is very relevant. However, careful planning and preparation, such as the construction of RTB and other infrastructure, are needed to ensure that undesirable incidents such as flash flooding can be avoided in the future. The proposed enlargement of Penang Airport will also involve a study of the drainage and channel system to prevent flooding, and therefore MOT (Ministry of Transport) and MAHB are working with all State Government agencies as well as stakeholders to ensure that the design takes this issue into account. Thank you, Honourable Member.
Thank you, I would like to invite the next question, Sungai Dua. There is no skipping, Bayan Lepas, please.
Dato' Yang di-Pertua of the State Legislative Assembly, my question is number 41. No. 41. How does the government consider the need for physical development to drive the economy while not neglecting the value of harmony between humans and nature? For example, when there are proposals for development of hilly areas, construction of large-scale foreign worker dormitories and proposals for sea reclamation? (a) State the effects on the environment and humans, and what mitigation methods need to be taken?
Thank you, Dato' Speaker, from my friend from Bayan Lepas for an important question, namely how we, in continuing development in the State of Penang, do not neglect the value of harmony between humans and nature. I wish to state that the matter of neglecting the harmony between humans and nature does not arise at all. Every development in the State of Penang is for the future and the future generations of the State of Penang, and what is most important is that we do it sustainably. Sustainable done and we have move forward. We cannot be living in ancient times. We need to move forward. As for how we do it, that is what we want to do, and that is the sustainable development method that we will carry out. Dato' Speaker, under Visi Pulau Pinang 2030, which is the most important document for us that looks at how we will reach 2030 to ensure the sustainability of all the people of the State of Penang is achieved, and it is in that document that we will ensure a green agenda and a smart agenda focused on families, which will inspire the whole nation. I do not want to take too much time, too much time, but this is an important question for us under, under the State structure plan, Dato' Speaker, we have a responsibility to follow that document which is legislation, where we are bound by our State structure plan, under which, among other things, Dato' Speaker, is to ensure that all development carried out has benefits for the people of the State of Penang, and we will ensure that when we have any development, Dato' Speaker, we will make sure, as here, that we comply with all mitigation requirements such as in the SIA (Social Impact Report) and EIA (Environmental Report) for all such developments, we are subject to that because that is what is required under the State Structure Plan and brought under all Planning Permission Plans, and organised, and I will not take too much time, but in the process of approving any development, all of this will certainly be taken into account, Dato' Speaker. That is all. Thank you.
Thank you. Just one. It's already come.
Okay. I agree with the views of the Honourable Member. The EXCO only needs us to look at the flooding incidents that have happened in Bayan Lepas, at Teluk Kumbar previously, and also at Kampung Seronok. Most of it is development on hills. When development is on hills, the rivers are the same, small rivers, and if flooding occurs in Bayan Lepas, water from the hills flows down to the river, and the water catchment is not able to cope, the water catchment is not sufficient. So I hope that when planning future projects, please take carefully into account the water catchment that the river is able to carry. Because we cannot make the river bigger anymore, we simply cannot, we can of course build embankments, but however high we build the embankments. Now development is taking place at Bukit Belah. That is also what I am worried about, because the development at Bukit Belah is all on the hill. This water will cause Kampung Seronok and Kampung Binjai to flood. But this river now, there isn't even a river. The river is under the FT Tank road. So we want the authorities in approving plans, please look at it from the downstream while we approve projects upstream, all projects need to look at the downstream, how the water catchment will be brought to the sea. Thank you.
Dato' Speaker, I have already stated, very generally but specifically also, I want to state specifically, all the developments we have are subject to many reports, which we want to ensure make the development a sustainable development in the State of Penang.
Thank you, thank you, Honourable Members. The 1 hour 30 minutes for oral questions has also ended, in accordance with the Sub-Rules of the Standing Orders of the Penang State Legislative Assembly.
Y.A.B. Chief Minister: Mr Speaker, the answers to the oral questions that have been answered just now will be placed on the table of the Members who asked and included in the Official Report.
Thank you, Most Honourable Member. Honourable Members, we are now in the Debate Session on the Appropriation Bill 2023 and the Motion on the Development Estimates 2023. Honourable Members, before I begin the debate session, a brief announcement for Honourable Members: we will not stop for lunch break and also for prayers, this is all according to the suitability of each Honourable Member's time; there is no obstacle for Honourable Members to leave to pray or to have lunch later. Yes, I want to ask who would like to take part in the debate session first? The practice is that we invite the Leader of the Opposition. But the Leader of the Opposition is on sick leave today. So I would like to invite the Opposition Members first, if there are any. If not, I would like to invite the Honourable KOMTAR, the acting one.
Pemangku apa?
There is no acting replacement for the Leader of the Opposition.
Okay, I would like to extend my millions of thanks to the Honourable Dato' Yang di-Pertua for giving me the opportunity to take part in the Budget Debate session... (interruption).
Honourable Member, the time limit is 20 minutes. Please proceed.
Debate on the 2023 Budget of the State of Penang, themed "Sustainable Development, Ensuring the Welfare of the People", in this honourable House. With reference to the Report of the Auditor General, the Financial Statements of the Penang State Government and State Agencies for the Year 2021, overall the financial statements of the State of Penang show a true and fair picture of the financial position of the Penang State Government for the financial year ended 21 December 2021. The accounting records have also been maintained in an orderly and neat manner. I wish to record my congratulations to the State Government, as the administration of the State Government, particularly on financial matters, is on the right track. Mr Speaker, I welcome the announcement of the granting of a premium discount for the extension of the leasehold tenure to owners of leaseholds whose tenure has expired but who still wish to continue the lease for residential, agricultural, commercial or industrial use. This is certainly good news for all state leaseholders, particularly for industrial use. Most industrial land in the State of Penang is held on 60-year leaseholds. The leases given to foreign investors and manufacturers in the 1970s, when Penang developed the E&E Industrial Sector, are now nearing the end of their lease periods. This announcement is indeed timely to reassure investors to continue their operations and investments in Penang, and to encourage long-term planning by investors who will continue to operate in the State of Penang. This will also enable them to reinvest in Penang to expand their factories, and at the same time will also stimulate the local economy. I would also like to propose that the State Government provide flexibility in the payment of the premium, and that the premium be paid in instalments. With the world economy currently experiencing a recession, we should help our own local economy. This is not only to ease the burden on leaseholders but also to increase the amount of disposable cash that can be spent and to ensure that cash flow for the local economy remains healthy.
Mr Speaker, the George Town World Heritage Site (UNESCO) has been an attraction for the tourism industry in the State of Penang since July 2008. The Penang State Government has established George Town World Heritage Incorporated (GTWHI) to spearhead efforts to preserve the outstanding universal value of the George Town World Heritage Site (UNESCO). There are many efforts to manage, preserve and promote George Town as a sustainable heritage city. As everyone is aware, the cost of preserving or restoring heritage buildings is higher than that of ordinary development. To help ease the burden on owners of heritage buildings, the State Government has allocated RM3.0 million for the George Town Heritage Habitat Seed Fund project. Owners of heritage buildings in the George Town World Heritage Site (UNESCO) who rent out their buildings may apply for this fund to carry out repair and conservation work on their buildings, on condition that the units are rented out for the long term at reasonable rental rates. This is not only to preserve the face of the George Town World Heritage Site (UNESCO). But also to address the problem of gentrification that has occurred in our heritage site, where residents are forced to move out of the heritage site due to high rental rates. The State Government has achieved positive results from the programme with six (6) buildings receiving assistance under this programme. However, the construction cost for each project requires at least RM200,000. This is the combined cost of purchasing the specified materials and payments to the professionals carrying out the repair work. All repair work on heritage buildings has criteria and guidelines that must be followed to ensure that the face of the building remains as original. Many of the original materials for heritage buildings are no longer easily found and sometimes have to be specially ordered for the repair work, and this will increase the cost of repairs. For the information of the buildings (GTWHI) that have been repaired and were launched last July, RM1.8 million is needed to continue the repair and preservation efforts of the Heritage Site, and we need additional allocation through a special grant from the Federal Government. This issue is faced not only by the Penang State Government, but the same issue has also been raised by the Melaka State Government. I am of the view that the Federal Government should provide allocations for the conservation of our nation's culture and heritage, or as proposed by the Melaka State Government. The Federal Government could once again issue a special grant given to Penang and Melaka when both our cities were recognised as UNESCO World Heritage Sites, namely RM50 million for both states. Mr Speaker, I fully support the State Government's efforts to continue negotiations with the Perak State Government for the implementation of the Sungai Perak Raw Water Transfer Scheme (SPRWTS). The incident on 6 July last, in which the Sungai Dua Water Treatment Plant had to be temporarily shut down because the raw water source from the Muda River became too turbid to be treated, is a reminder to us of how important it is to obtain an alternative raw water source as soon as possible. This project (SPRWTS) is very important as an additional raw water source to meet the water demand of the State of Penang up to the year 2050. The results of a study conducted by the Ministry of Environment and Water (KASA) have shown that the water capacity of the Sungai Perak is sufficient to meet the needs and demand of north Perak and the State of Penang. Therefore, this project is a common good, bringing common benefit, especially with the transfer of power that took place in conjunction with the 15th General Election, and Perak is now under the joint administration of the Pakatan Harapan Government with Barisan Nasional. This is a golden opportunity to make the SPRWTS project a success, a project that has been under discussion since 2009. The State Government has planned and worked diligently on the transport system in Penang under the Penang Transport Master Plan. However, it is very heartbreaking that the PTMP has been sabotaged. The State Government has not received cooperation from the Federal Government, so the progress of the PTMP has been slow. Traffic problems in some areas are becoming increasingly critical by the day. I give the example of the situation that occurs on the First Penang Bridge, where normally we only take 10 minutes to cross the bridge, but at peak hours the same journey takes more than 1 hour. Traffic congestion like this does not only occur on the Penang Bridge but occurs in many places around us. Sometimes at peak hours and with no accidents, no rain and no maintenance work on the road, those who drive have to take three times or even four times as long to get home. This shows how important the PTMP is and that it must be implemented as soon as possible. Especially the undersea tunnel project. I hope the State Government can resolve the problems that need to be addressed with Penang Port Sdn. Bhd. (PPSB) regarding the alignment of the undersea tunnel so that this project can be started immediately. Mr Speaker, in the 2023 Budget speech, the State Government has allocated RM13.5 million specifically to finance public transport so that the people of Penang can enjoy public bus and ferry services free of charge. This effort is good to encourage people to use public transport more often, while we are all still waiting for the State Government to provide LRT services. I would like to propose that the State Government provide dedicated bus lanes on the First Penang Bridge and the Tun Dr. Lim Chong Eu Expressway during peak traffic flow. With the provision of these dedicated bus lanes, bus users will be able to avoid traffic congestion and reach their destinations on time. This will boost confidence and encourage more people to choose bus services over using private cars. This effort is to ensure smooth traffic and provide convenience to affected parties. For example, in Kuala Lumpur, Rapid Bus Sdn. Bhd. and Kuala Lumpur City Hall (DBKL) have jointly conducted a pilot test of a dedicated bus lane on the Jalan Ipoh corridor since 1 March 2022, with the aim of reducing travel time, assessing the level of travel experience and passenger safety of Rapid KL bus services. We can first carry out a pilot project to ensure that bus movements are not congested with other vehicles, saving time and guaranteeing the safety of users when boarding and alighting from buses because they can stop at designated bus stops. Mr Speaker, the Penang State Government is often accused of marginalising Islamic Affairs, but the allocations provided every year have proven that these accusations are untrue, and no one has been marginalised. The State Government has provided allocations every year to empower the development of the Islamic Religion in the State of Penang, including the repair, construction and upgrading of surau, mosques, religious schools, education assistance payments for religious schools and others. Various official Islamic religious events at the State of Penang level have also been organised. There are seven (7) mosques within the Komtar State Assembly seat (KADUN). As a representative of the people, every year I also allocate funds to celebrate the month of Ramadan. In addition, if the Mosque Qariah Committee submits an application to repair, upgrade or request equipment for the mosque, my Service Centre also provides support and assistance.
Mr Speaker, for Non-Islamic Affairs as well, the State Government has taken the initiative to establish the Trust Fund for the Maintenance of Non-Islamic Places of Worship (RIBI). This trust fund is established for RIBI to maintain or build places of worship, with a maximum allocation of RM50,000 for each project implemented. To date, a total of RM9.24 million has been channelled to non-Islamic places of worship through the RIBI Fund. 220 projects have benefited from the RIBI Fund, namely Chinese Temples (109), Indian Temples (56), Churches (44) and Gurdwaras (11). This is the effort of the Penang State Government to help all RIBI in Penang. During the Movement Control Order (PKP), the State Government also provided assistance to 1,771 registered Non-Islamic Places of Worship Organisations (RIBI), each of which received a special financial aid of RM1,000 on a one-off basis. The State Government is currently collecting RIBI data through the e-RIBI system. I propose that the State Government study and consider giving a special grant of RM3,000 every year to all RIBI that register with the State Government. All RIBI may use this special aid to organise activities for their respective organisations. The State Government has also established the Penang Harmony Corporation (HARMONICO) last year with the objective of building and promoting the concept of religious harmony, and a budget of RM1.30 million will be provided in 2023 to carry out its role. Mr Speaker, the tourism sector of Penang needs to be developed more rapidly in facing increasingly fierce competition from regional countries. I support the efforts of the State Government in channelling more allocations and grants to empower the tourism industry so that Penang can compete with these tourist destinations. Penang is ready to receive more local tourists and tourists from abroad, especially now that Malaysia has reopened its borders. Penang, as one of the most visited tourist destinations in Malaysia, must always adapt to changes in the world compared with tourist destinations on other islands in Southeast Asia such as Bali, Phuket and Singapore. On average, the annual number of tourists for these tourist destinations is as follows: (i) Bali 6.3 million; (ii) Penang 8.3 million; (iii) Phuket 9.89 million; and (iv) Singapore 19.1 million.
I would like to propose that the State Government set clear objectives and learn from tourist destinations that have a larger number of tourists than Penang, in order to increase the attractiveness of tourism so that Penang continues to be a sought-after tourist destination. I also urge the Ministry of Transport to begin the upgrading work of the Penang International Airport as soon as possible. Mr Speaker, I would like to touch briefly on the issue of pork prices, which have increased nine (9) times since January this year. The price of raw pork has risen from RM670.00 per 100 kg in January 2022 to RM1,350.00 per 100 kg at the end of October 2022. This increase in price is double the original price.
There are several factors that have caused this situation, mainly due to the increase in the price of raw pork ingredients, most of which must be imported from abroad. The situation worsened when African Swine Fever (ASF) entered Malaysia and caused many pig farms to have to dispose of all livestock infected with the disease. Although the Penang Pig Farming Enactment came into force from 2017, the State Government has given farmers time to adapt and carry out all the modification work to meet the conditions stipulated in the new enactment. The conversion to a closed-house system will not only improve the level of farm hygiene, but will also protect local residents, farmers and pigs from disease and pollution. However, the reality of implementing this enactment is a drastic reduction in the number of farms, because some small-scale farmers do not have the funds to undergo the necessary modification work and consequently choose to end their farm businesses. This has further worsened the situation of pork prices with a shortage of pork supply. Therefore, I hope the State Government can provide a scheme to help small farmers switch to modern pig farming systems and assist small farmers affected by COVID-19 as well as African Swine Fever. At the same time, as a measure to control the price of pork, I also hope the State Government can help provide subsidies for the purchase of raw food ingredients, thereby encouraging domestic farmers to increase the cultivation of crops that can be used as animal feed, such as maize and legumes. Mr Speaker, I thank MBPP for providing free electric motorcycle charging stations at eight (8) identified locations. This measure aims to promote the use of electric motorcycles in line with the Penang Vision, which targets a 50 per cent reduction in carbon by 2030. However, I would like to propose that the State Government provide electric car charging stations in Penang. These can be provided at suitable places such as public buildings. I believe such efforts can give users confidence to use electric vehicles and at the same time ease the fuel costs that they have to bear. Mr Speaker, in recent years, George Town has transformed into the state capital of street art, brightened with mural paintings covering various concepts through the beautification of back lanes and side lanes of buildings around the city, step by step. MBPP has succeeded in transforming back lanes that were once pitch dark, unsafe and dirty into areas that are safer, cheerful and clean. This noble effort has indeed given a new image to these lanes because it has succeeded in becoming a tourist attraction. MBPP took a period of five (5) years to upgrade back lanes spanning nine (9) km as well as open areas covering ten acres around George Town, the UNESCO World Heritage Site. Here, I would like to propose that MBPP may begin the upgrading work of back lanes 2.0 by adding value through allowing business activities in suitable lanes. MBPP should select back lanes that have the potential to generate income for prospective new traders...(interruption).
Time has already run out.
A little more, please. We can take as an example the beautification project of Lorong Panggung, better known as Kwai Chai Hong Lane in Kuala Lumpur. This back-lane beautification project involved ten (10) shophouse units categorised as heritage buildings, in line with Jalan Petaling. The project has enabled the shops there to carry on business in two sections, at the front and at the back of the shop. Previously, the community only sat inside the buildings. However, they now feel comfortable coming out to enjoy various interesting activities. Tourists who go there not only can take photographs but can also stop by to enjoy coffee, cakes and ice cream. This is a value that Penang can emulate. Therefore, if the back lanes in Penang are successfully upgraded, they will surely breathe new life into the tourism sector in our state.
Mr Speaker, not far from the Komtar Building, there is a public housing scheme of the Penang Island City Council (MBPP) developed in the 1950s, namely People's Court, which has three (3) blocks with 78 housing units and 60 units without bedrooms. At that time, there were already studio-type designs with only 250 square feet, and 18 units with one bedroom with an area of 305 square feet.
In the past, one of these small housing units could accommodate six or seven family members living together. Please, Honourable Members, imagine how difficult the situation was at that time. But time has passed. Many residents of the second and third generations have moved out, and now only elderly people live in each unit. Most units are occupied by only one or two senior citizens. Here, I extend my heartfelt thanks to MBPP for approving a budget of RM115,550.00 to repaint these three blocks. This is indeed a very welcome effort. I would like to represent the residents of People's Court in thanking MBPP. Since all the units are owned by MBPP and the units are also more than 60 years old, the units face problems in terms of dilapidated toilet fittings, sewerage pipes and water supply that need replacing, old electrical cables, leakage problems and many others. I would like to propose that MBPP carry out the work of upgrading all units in phases. The new designs should be more suitable for elderly residents, and it is hoped that the elderly occupants can be moved to units on lower floors.
Mr Speaker, the shortage of parking spaces is one of the complaints that my Service Centre frequently receives, particularly at Lebuh Campbell. Lebuh Campbell is a historic commercial hub within the World Heritage Site, but the problem it faces is insufficient parking. Last year, I allocated RM45,000.00, and another RM45,000.00 was also allocated by MBPP to carry out a pilot project to widen Lebuh Campbell road from the junction of Jalan Penang to the junction of Jalan Kuala Kangsar, with the aim of allowing more parking bays to be added on both sides of Lebuh Campbell. The result of this project has successfully added 15 car parking bays and 24 motorcycle parking bays, and it has been well received by the traders there. Accordingly, the traders hope that the road widening project can be continued with the widening of this road across the whole of Lebuh Campbell up to Pasar Lebuh Campbell. I often receive feedback from traders that
the main factor for the decline of business on Lebuh Campbell is that their customers do not have sufficient parking spaces. Their customers constantly complain that they are often issued summonses, have their cars clamped or towed by MBPP enforcement officers. Therefore, the traders very much hope that this project can be carried out as quickly as possible, and that more than 30 new parking bays can be added, which will surely stimulate the income sources of the traders in this area. In addition, I also hope MBPP can carry out a decorative lighting project suitable for Lebuh Campbell to enhance the atmosphere around the area. Mr Speaker. Since 2008, the State Government…(interruption).
Sila rumuskan.
Mr Speaker, the first one, please give me a little more time. It is almost over.
The Honourable Member has had plenty of time.
Okay, okay. Since 2008, the State Government, through the Penang Development Corporation (PDC), has carried out many efforts to rejuvenate the KOMTAR building. Among the efforts are upgrading KOMTAR Walk, ICT Mall, a programme to buy back units owned by private parties, The Top and UTC. In the previous State Legislative Assembly (DUN) sitting, I put forward an idea to PDC to rent out the vacant units at KOMTAR that have not been rented for a long time. I have also repeatedly proposed zero rental to attract tenants, but until today this proposal still has not been implemented. I have also offered myself to lead a task force to deal with this issue. For the information of Honourable Members, I view this proposal seriously and I also want PDC to start a programme to buy back units according to targets. I would also like to propose to PDC that, in efforts to rejuvenate the KOMTAR building, PDC may collaborate with PWDC, PYDC and Digital Penang to promote the vacant space at KOMTAR as office space. To make this effort successful, the KOMTAR building also needs faster internet speeds; if combined with 5G services, it would be better. I would like to thank the Executive Committee Member for Youth and Sports, through the Penang State Sports Council (MSNPP), which has allocated RM200,000.00 to set up an Esports Academy on the 3rd floor of KOMTAR. With the existence of this academy, it will attract more young people to come to KOMTAR and further stimulate business activity at KOMTAR.
Mr Speaker, last. The State Government of Penang, in strengthening the agenda of social development at the local community level by creating a collaborative space known as the Penang2030 Centre in every state constituency (KADUN), is very much welcomed. I am pleased to inform that the Penang2030 Centre has attracted the attention of all levels of society, including young people, women, senior citizens and especially non-governmental organisations (NGOs).
With permission, I would like to inform that the Penang2030 Centre for the KOMTAR state constituency was completed at the end of October and is ready for use by the public. This is a collaboration between my Service Centre and young people from Equator College Penang in the interior design of the Penang2030 Centre for the KOMTAR state constituency so that the centre meets the basic needs of all groups in society. The Penang2030 KOMTAR Centre includes a small hall that can accommodate 60 to 80 people and a meeting room that can accommodate up to 20 people. In addition, a lobby area and a pantry are provided. The centre has already started to be used and we are now waiting for a date to hold the opening ceremony. Mr Speaker, the problem that Malaysians are facing now is a serious economic problem: prices of goods are rising, inflation, and the value of money is falling, as a result of the unpredictable global economic crisis, and furthermore, the management and administration of the Federal Government has failed. I hope that the 2023 Budget can help the people of Penang in tackling economic problems, and that all Members of the House can share sound ideas to help the people get through this difficult time. With that, I humbly move to support.
Thank you, KOMTAR. Time is up. I want to invite, yes please. Batu Lancang. The extra time will be deducted from the time of Batu Lancang.
Dato' Speaker, I move that the time be extended from the Opposition. Thank you, Dato' Speaker of the Penang State Legislative Assembly, Honourable Members of the State Legislative Assembly, and Heads of State Departments. Greetings of peace, greetings of hope and greetings 2030.
Honourable Dato' Speaker, I am happy to place on record my highest appreciation to this august House for giving me the opportunity to debate the 2023 Penang Budget speech delivered by the Chief Minister yesterday, under the theme ‘Pembangunan Mampan Mensejahterakan Rakyat’, focusing on the four main pillars of the Penang2030 Vision, namely “Meningkatkan Daya Huni, Menaik Taraf Ekonomi, Memperkasakan Rakyat dan Melabur Dalam Persekitaran Fizikal”. It was drawn up so that the state's development agenda can continue, with the well-being of the people continuously enhanced in line with the Penang2030 Vision. The 2023 Budget recorded a deficit of RM467.12 million. This projected deficit has increased by RM17.32 million compared with the 2022 deficit, which totalled RM449.80 million. The projected annual revenue for 2023 totals RM522.35 million, compared with Operating Expenditure of RM989.47 million. The contribution and role of the Village Community Management Council (MPKK) are very important. To recognise the role it plays, the State Government has approved the payment of an allowance of RM300 a month to the MPKK Treasurer, and an increase in the Meeting Attendance Allowance from RM50 to RM100 a month, effective from 1 July 2022. Taking this increase into account, a total of RM12.98 million will be allocated to MPKK in 2023. RM300 each will also be given to Supervisors and Teachers of KAFA, Teachers of Public Religious Primary Schools, Teachers of Public Religious Secondary Schools, and Teachers and staff of Chinese Private Schools. RM200 will be paid to Tahfiz Teachers, Pondok Teachers and TADIS Teachers in the State of Penang, which will involve additional expenditure totalling RM900,000.
For the payment of the Equitable Economic Agenda Assistance to low-income groups through the Department of Social Welfare, an allocation of RM8.2 million has been made for 2023, where last year it benefited 1,305 recipients. As a token of appreciation for the solid support of all civil servants of Penang, the State Government agreed to approve a special year-end financial assistance payment equivalent to half a month's salary or a minimum of RM1,200. The payment involves a total of 3,920 civil servants, with a financial implication totalling RM6.13 million, and will be made this December. This assistance is expected to raise the spirit of civil servants to provide more excellent service.
Honourable Dato' Speaker, the issue of floods. The flood mitigation project at the Sungai Jelutong Diversion (underground) at Jalan Tengku, the junction of Jalan Jelutong and Solok Perak was started on 3 August 2018 and completed in 2020. This project is under the State Government's allocation, which cost RM13.3 million. The main scope of this project is to upgrade the existing underground drainage structure (Sungai Jelutong Diversion) which needs to be rehabilitated over a length of 495 square metres, to upgrade the Jelutong Junction, to upgrade Jalan Tengku over a length of 300 metres, and Solok Perak over a length of 100 metres. These upgrading works will directly help resolve the problem of the structural integrity of the underground drainage diversion, as well as redistribute traffic around the project alignment and reduce the impact of floods downstream of the catchment areas of Sungai Jelutong and Sungai Pinang. There were 12 flood incidents at Solok Van Praagh from the end of 2018 to 2019. Homes at Solok Van Praagh must be inundated by floodwaters within 30 minutes when the rain does not stop. Apart from that, homes on Jalan Van Praagh and Jalan Sir Ibrahim were also affected. Officers of the Drainage and Irrigation Department (JPS) and the Penang Island City Council (MBPP) have also carried out several site visits to the Solok Van Praagh area. Finally, the Office of the State Assemblyman for Tanjong Bunga, the State Executive Councillor for Infrastructure and Transport of Penang announced two (2) projects to upgrade the drainage system at Solok Van Praagh, which were announced on 29 August 2019. Phase 1 of the project began on 26 August 2019. To overcome the flood problem at Solok Van Praagh, JPS carried out works to widen the river from 0.9 metres to 5.0 metres and works to dredge sediment over a length of 200 metres. In addition, the construction of an online pond at Sungai Jelutong and the upgrading of the existing concrete wall structures on the left and right of the river to increase the capacity of Sungai Jelutong was carried out by the developer, Setia Sky Ville. The cost of the project was RM350,909.32 and it was completed on 26 November 2019. Phase 2, the upgrading of the drainage system works implemented by MBPP, began in January 2020 and was completed in December 2020. The project cost RM378,000.00, including the installation of a box culvert, duck bill type one-way valves at the outlet to Sungai Jelutong, and the construction of a flood detention pond with a dry pond concept. This Phase 2 also involved the construction of two small water reservoirs and the widening of the road to 4 metres. Phase 3, the flood mitigation project with the construction of an underground water retention pond at Solok Van Praagh, has been funded by the State Government since 1 June 2022 at a cost of RM5.7 million, and is expected to be completed on 31 May 2024. This project involves an underground flood retention pond with a capacity of 5,175 square metres, an area of 2,200 square metres and a depth of 2.6 metres. It is equivalent to two Olympic-sized swimming pools. The mitigation works in Phase 3 involve enlarging the existing drain and the mitigation project also includes access ramps. In addition, this project includes a diversion channel measuring 1.5m x 0.75m and 80 metres long, which functions to channel some of the water flow from Jalan Hamilton to the retention pond. It also has two flap gates with a diameter of 0.75m at Sungai Jelutong. The existing Sungai Jelutong diversion, 1.2 kilometres (km) long, is the main river basin for the Solok Van Praagh area with a total catchment area of 0.57 square km. More than 300 residents, involving about 70 houses in the Van Praagh and Jelutong area, will benefit from the flood mitigation project at Solok Van Praagh that is being carried out to solve the problems faced for the past 30 years.
Among the critical flood areas are Solok Van Praagh, the junction of Jalan Van Praagh, Jalan Sir Ibrahim, Lengkok Hijau and Lintang Slim. Although the flash flood incident in Batu Lancang did not result in loss of life, this disaster, which frequently occurred previously, has affected the residents. The frequent occurrence of flash floods has caused great losses to the community, especially traders, in addition to people's property. Therefore, the measures taken by the government, including MBPP, are not only to reduce the flood problem but also to give confidence to the people that their interests are being given attention by the government.
Issues of Electricity, Hawkers and the Jelutong Expressway For the Batu Lancang State Constituency, power outages have occurred four (4) times within a period of one month, including incidents on 29 September, 6 October, 8 October and 18 October 2020. The areas affected include Taman Hijau, Jalan Hamilton, Jalan Van Praagh, Lorong Slim, Jalan Sir Ibrahim, Jalan Kurau, Eastern Court, Medan Hikmat and several other areas. Tenaga Nasional Berhad (TNB) has promised to overcome this problem, which keeps recurring, and will improve the electricity supply services in the area. After a discussion with TNB officers and technicians, the cause was found to be a low voltage problem and electricity could not be supplied to the entire area. Therefore, the action to be taken by TNB is to upgrade the low voltage system in the affected areas, including Taman Hijau, Mewah Court and Desa Green by May 2021. TNB has increased the voltage in the affected areas to 11kV involving three sub-stations, namely at Taman Hijau, Desa Green and Mewah Court. This is to cope with the shortage of power in those areas, where power outages have frequently occurred. This is also something that has long haunted residents in the area for 20 years. It was also among the complaints made to me as soon as I became the State Assemblyman for Batu Lancang. At the same time, TNB has indeed often helped whenever problems arise with the electricity supply, and I am very grateful. In 2022 so far, there have been no incidents of power outages. I also appreciate TNB's efforts in upgrading by installing a controller system on all the main roads in Taman Hijau. Previously, if a power outage occurred, it affected an entire housing estate, but with the control system, only one affected road is involved and not all of the large housing estates.
Regarding the hawker issue, last month I met with hawkers who were trading in the lower area of Flat 328, Taman Perak. They have been trading there for 40 years, but did not have licences. I helped these traders after meeting with the MBPP Licensing Department as well as with the assistance of a Councillor. A session was held between these hawkers and MBPP officers and they were given explanations on how to apply for licences along with the required documents. Out of a total of 34 small traders under this flat, 31 have succeeded in obtaining licences, two are in the approval process and one other has only just applied. These traders are very happy that they can now trade legally after 40 years of trading without a licence.
Regarding the issue of the Jelutong Expressway, I have succeeded in obtaining an allocation from MBPP of RM400,000 next year, which is 2023, to build a large drain with a width of 1,200mm x 900mm and a length of approximately 300 metres along that area, together with a walkway area to make it easier for the public to walk to the market. With these works, it can solve the flood problem from the high areas, namely Lintang Jelutong and Tingkat Jelutong, when rainwater overflow from here flows down to the low areas along the terrace houses on the Jelutong Expressway. The cause is that there are no small drains. This situation causes flash floods. When the construction of this drain is completed, it will resolve a long-standing issue that has dragged on. In conclusion, this is an example of a problem that has lasted for decades and could not be solved, but which I have successfully overcome in this term. There is a lot more work that we have done, but I have not brought it to this august House to be debated.
For the issue of EPF savings. If an individual who retires at the age of 60 lives until the age of 80, this means they have 20 more years of life. Assuming they have EPF savings of RM1 million, this means they are able to sustain their living with RM4,000 every month for 20 years to spend. But if the EPF savings are RM600,000, the money that can be spent during retirement for 20 years is RM2,500 a month. Based on the percentage of individuals who have EPF savings of RM600,000, only 4 per cent, this means that the EPF savings of contributors are indeed very low. If we follow the current trend of calculation, more than 56 per cent have savings below that amount. Therefore, the Federal Government needs to look into this issue because senior citizens who are about to retire cannot live comfortably as they do not have sufficient contribution money. According to a report in the newspaper The Star, which quoted the Chief Strategy Officer of the Employees Provident Fund (KWSP), Nurhisham Hussein, the sum of RM1 million is the minimum savings rate after deducting several other factors including inflation and medical bills. A person needs approximately RM600,000 to have a retirement if they live in a big city like Kuala Lumpur. The sum of RM600,000 can only cover the normal medical needs of outpatient or routine treatment and not any major medical needs. Based on the EPF's calculations, Malaysia has now reached a group of society that is ageing, with approximately 65 per cent of contributors aged 54 having savings of less than RM50,000 only. With RM50,000, a person can only last just over four years, assuming their expenses total RM1,000 a month. At that time, approximately 50 per cent of EPF members have less than RM10,000 in their accounts, while approximately 27 per cent have less than RM1,000. If what the EPF has stated is true, the sum of RM50,000 in contributors' savings means they can only spend RM210 a month for a period of 20 years. Indeed, the living conditions will be even more miserable for contributors with low savings. Therefore, the government needs to look at this issue seriously. In conclusion, if this trend happens, it means that the people of Malaysia will face difficult and hard living situations after retirement. This could also become a frightening catastrophe, so the Federal Government needs to act. Surely every pensioner envisions a comfortable and good life, but unfortunately, according to the EPF report, this means that workers who have retired have to keep working until the end of their life to support their living. The EPF needs to implement various new measures to increase members' returns. The EPF's dividend distribution strategy also needs to be reviewed to increase members' savings, especially for those who have withdrawn their savings through the special programmes i-Citra, i-Lestari and i-Sinar. The EPF can introduce a new investment model, namely diversifying investments separately according to the type of contribution with the lowest possible risk.
Rebuilding Penang Phase The pandemic, which is increasingly ending, now sees Penang needing to be urgently revitalised so that the economic recovery phase can be implemented quickly. Leading this work is the Chief Minister of Penang, Honourable Chow Kon Yeow, with a focus on various aspects and important economic sectors. Penang is an attractive investment location and it continues to develop and progress today. Efforts towards growth and giving new breath to the economy are due to the interest and investment from local and foreign investors. What makes Penang an attractive investment location is its strong economy, especially in industries such as information technology (IT), manufacturing and tourism. Being the second smallest state by land size, Penang has nevertheless created its own history when it attracted foreign investment worth RM74.4 billion last year, which is a great achievement of 6.06 per cent compared to the previous year.
Moreover, the investment value received by Penang has increased by 29.3 per cent, which is RM363.7 billion, on the chart of the country's total export value, which stands at RM1.24 trillion. Penang also recorded an achievement of Gross Domestic Product (KDNK or GDP) of 6.8 per cent, one of the highest compared to other states, exceeding the national figure of 3.1 per cent. This places Penang in third position with a GDP per capita value of RM58,527, after Labuan and Kuala Lumpur. Penang recorded approved manufacturing investment totalling RM6.3 billion in the first quarter of 2022, paving the way to become one of the major contributors to the country in terms of the total inflow of investment this year. Penang obtained a record high of RM76.2 billion in the total approved manufacturing investment in 2021, significantly exceeding the performance of previous years. Penang's economy over the past 50 years has been supported by the industries of Bayan Lepas and recognised as a semiconductor and electrical and electronics hub for this region. Foreign investors have also created thousands of job opportunities, especially for highly skilled labour, therefore the Penang State Government must ensure that the rapid development of this human capital keeps pace with the economic progress of the state. It must also be in line with the three pillars laid down by the Chief Minister himself, namely T-I-P, which covers talent, basic facilities and planning. Through the aspect of talent development to produce the human capital needed in the job market, Penang Future Foundation has awarded scholarships to approximately 650 graduates in the fields of science, technology, engineering and mathematics as preparation for the future. Apart from scholarships, the State Government has also allocated annual funds to finance the operating and development needs of several schools. This grant helps provide a conducive learning environment for students. This practice only began 14 years ago, namely after the victory of the then government in the 2008 General Election. Over the past four (4) years, the then State Government administration channelled a total of RM62 million in assistance to several Public Religious Schools, Chinese-stream schools, Tamil schools, Punjabi schools and Mubaligh schools. Believing that effective education must begin early, the Penang State Government also finances tuition class fees for 3,000 students under the initiative of Penggerak Komuniti Muda's Tuisyen Rakyat (PEKA). In further boosting the state's development, apart from the aspects of developing human capital and having the best infrastructure, the factor that is also emphasised is direction or directive. This is because Penang's success in the past four years would not have been achieved without good planning as a guide for the policies set. Under the administration of the Chief Minister, the Penang Government has i. Built more than 138,545 affordable housing units ii. Boosted the economy with a high value of foreign investment iii. Built eight flood mitigation projects iv. Added approximately 286 hectares of forest reserves v. Financed free tuition for 3,000 students vi. Increased the welfare payment for senior citizens and persons with disabilities. This is also among the promises of the 2018 manifesto that were subsequently fulfilled by the State Government, resulting in successes as enjoyed today. Now, the administration of the Penang State Government is planning a development plan for the next 10 years… (disruption).
YB., masa.
One more minute. Having achieved about 90 per cent of the 2018 election promises, the Penang Pakatan Harapan Government is now ready to carry out the State's future plan and a new manifesto in preparation for the upcoming State election. As a government today, a manifesto is not merely a sheet of paper or a brochure, but contains what is planned for the future of the State of Penang. Honourable Dato' Mr Speaker, before I end my debate speech, once again I would like to extend a thousand thanks to everyone involved in this session of debate. That is all, thank you, and I beg to support.
Thank you, Batu Lanchang. Yes, Bukit Tambun. Please. Time is running.
Okay. Thank you to Dato' Mr Speaker for giving me the opportunity to take part in the debate on the Supply Bill and the Development Estimates 2023, themed "Sustainable Development for the Welfare of the People". Based on the presentation by the Honourable Padang Kota, Penang shows the highest growth rate, namely at 6.8 per cent. Its contribution to GDP increased to 7.1 per cent, manufacturing output grew to 47.3 per cent, and Penang also became the most important contributor to international trade for Malaysia's trade. Penang also remains the leading exporter, with a contribution of 33.2 per cent to the country's export value as of September 2022. However, based on these achievements, in fact the returns obtained by the Penang State Government from the Federal Government are among the lowest compared to other states. Therefore, here I call upon whichever Federal Government will be formed in the near future not to continue step-motherly treatment of Penang. We are the highest foreign investment generator and the highest export contributor in this country, but the returns obtained are too low. It is not fair for us to ensure sustainable development in the State of Penang and it is also difficult for us to achieve a more comprehensive welfare of the people. In the 2023 Budget presented by the Honourable Padang Kota, which emphasises 4 Main Pillars. First: Enhancing Liveability to Improve Quality of Life. In this regard, during the last GE, the Honourable Padang Kota, who contested in Batu Kawan, and other EXCO members who did not contest had the opportunity to campaign throughout the State of Penang to help candidates at the Parliamentary level. I believe the Honourable Padang Kota and the EXCO line-up have become closer to the people, understand the real situation at the grassroots level better, and also understand the problems faced all this time better. Therefore, for the Seberang Perai level, I once again emphasise the need for a Seberang Perai Transport Master Plan, or known as the Seberang Perai Transportation Master Plan. Traffic congestion has become increasingly severe in Seberang Perai. From the Jawi Toll to the Sungai Dua Toll, along the Federal Road and State Roads, there is indeed very severe congestion. This morning, I travelled from Bandar Tasek Mutiara to the Second Bridge, which took approximately 45 minutes. From the Second Bridge to here took only half an hour. Therefore, a comprehensive action must be taken, and to ensure this Master Plan can be realised, allocations from the Federal Government are compulsory. We cannot keep waiting for the 12th Malaysia Plan, the 13th Malaysia Plan, the 14th Malaysia Plan; instead, immediate action is needed. Treat this as a crisis and solve this problem. Apart from that, the issues of river pollution must be overcome. Rivers are a gift from God as a source of drinking water for us. When we pollute rivers, it means reducing our drinking water supply and daily use. Therefore, on the issue of river pollution, in fact we have identified the main sources of pollution, and we need to take firm action to cut off these sources of pollution and take action against these polluters. At the same time, the Seberang Perai Municipal Council has been upgraded to the Seberang Perai City Council. Therefore, residential areas must have recreational areas, leisure areas or open spaces that function to ensure this environment is more suitable to live in, namely in line with what was conveyed by the Honourable Padang Kota, that is enhancing liveability and improving quality of life. Reduce congestion, tackle the pollution issue and increase recreational areas. Second: Regarding the Issue of Increasing Household Income.
Although we have achieved very encouraging results, especially in the industrial sector, nevertheless, this industrial sector indeed creates employment opportunities, but it is more for skilled and semi-skilled workers in the fields of engineering science, science and mathematics, and in terms of animal husbandry and agriculture, we need more foreign workers. A gap has arisen where our young people, or Penang citizens who do not have a background in science, technology or engineering, do not have quality jobs or jobs that can generate income that can increase their earnings. Therefore, regardless of the industrial, agricultural and livestock sectors, we need to find ways to involve all Penang citizens, ensuring all levels have the opportunity to take part in the job opportunities created through investment and also the sectors I mentioned earlier. In terms of tourism, Penang is the first state to establish the creative economy, or creative tourism sector. This can in fact create employment opportunities for small-scale tourism operators, especially in areas outside George Town. The EXCO for PITECH needs to be, needs to be more sensitive and also needs to be more comprehensive to ensure this tourism is not only confined to George Town and Bukit Bendera but covers Seberang Perai so that this creative economy is everywhere. Ensuring all industry players get the benefit. With permission. Third pillar: Regarding Regarding Increasing Community Participation.
At this time, we have MPKK, and JPWK and JBPP which indeed open a fairly wide space to empower community participation. However, this community participation is still limited to MPKK members or perhaps from among members of political parties. I hope MPKK, JBPP or PYDC can be more active like PWDC. PWDC, through JPWK, organises more comprehensive programmes and involves more women reaching the grassroots level
and can also reach the elite level from the grassroots level, where all levels have the opportunity to take part in the programmes produced by PWDC. In the recent election, we were always worried about the voter turnout of young people, or better known as the 18-year-olds, as in Melaka and Johor. However, in the last two polling stations at each polling centre, the voter turnout reached more than 90 per cent. Early on polling morning, I was surprised to see young people already queuing long since 7.45 am to vote. I did not know them, fortunately they still knew me, among them were my former tuition students when I was a tuition teacher and friends of my children. Throughout the 14th campaign, we did not have the opportunity to approach them; the programmes we held never saw young people, but on polling day they were among the largest groups coming out to vote compared with other age groups. Therefore, here I can conclude that in fact these young people follow current political developments. They also actually want to take part in developing the state or the country. I asked them, why are you all able to come out to vote? They informed me that in fact they follow daily developments on politics, economy, society, state and country. They informed me that they use social media differently from us; they rarely use Facebook or WhatsApp. They use their own social media that they talk about, and until now I still cannot identify what kind of apps they use apart from TikTok. They actually exchange views and disseminate information among themselves. Therefore, here I call upon the PYDC and also the EXCO for Youth and Sports to organise programmes that are liked by the youth, hold programmes that can reach them, so that we obtain ideas or actually know what these young people want. We need to be together with them and invite them to take part in the programmes we hold and invite them to contribute to development at the grassroots level, the District, the State, or even the National level. They are in fact our future; they are the ones who will administer this state and country. Since the constitution has been drafted, they have the right to be candidates and also to vote. Therefore, although they are still studying, once they reach the age of 18, they must be given the same opportunities to take part. Fourth: Regarding investing in the physical environment will increase resilience.
In this matter, I do not see a more detailed plan or proposal in this budget. Therefore, I request that the Honourable Padang Kota elaborate in more detail in the winding-up session on what exactly the investment in the physical environment that can lead to increased resilience is. I welcome the State Government's decision to provide premium discounts for extension of lease tenure and purchase of ownership, but here I once again urge the Honourable Padang Kota and also the PTG or the District and Land Office to ensure that the process of considering TOL applications, where TOL payments need to be simplified and expedited. I would also like to request the Honourable Padang Kota to elaborate more carefully on PG Land, the Local Land Services Online System of Penang, what it actually is, the function of this service, and here I also welcome the approval of permanent ownership titles for low-cost and low-medium-cost houses free of charge for non-strata State Government projects. This is a promise we have kept, even though it only involves about 2,545 non-strata low-cost and low-medium-cost house ownerships, but this is an achievement that our State Government should be given credit for. At the same time, we request the Federal Government to amend the legal aspects of the National Land Code and the Strata Titles Act 1985 concerning this, to enable the State Government to grant permanent ownership to low-cost and low-medium-cost flats in State Government projects, because for PDC alone we still have non-permanent ownership. In Penang alone we have 12,2062 units of low-cost and medium-cost strata housing, because for non-strata we have already completed. For strata, we cannot implement it because of obstacles in the legal aspects of the National Land Code and also the Strata Titles Act 1985. On the issue of water, given the formation of the Perak State Unity Government on the evening of yesterday, the State Government needs to quickly continue negotiations with the Perak State Government for the implementation of the water transfer scheme project from the Kerian River, namely SPRWTS, Sungai Perak. We need to transfer water from the Perak River to Bukit Merah, then to the Kerian River and treated to be supplied mainly to users in South Seberang Perai. This water supply has become a very big issue in the State of Penang, especially in Seberang Perai, with the rapid development in Penang, especially over the last 10 years. We need to solve this problem. The Muda River water supply can no longer cope, or the water does not reach SPS, Taman Seruling Emas and Sungai Duri in Mukim 5, SPS. On this occasion, they staged protests, where the voter turnout in this area was rather low. They did not side with anyone; they were angry at all parties at the Federal, State and ADUN levels. Without water, one cannot live comfortably; the water rationing imposed by PBA at present indeed causes public anger. I hope the Booster Pump at Permatang Tinggi, which is expected to be completed at the end of this month, can reduce the water shortage problem in SPS. I hope that on 1 December, we can go and officiate this pump house without any further delay.
Here, I also want to obtain an explanation on the initiative of Top Up Women One Only Additional Seats (TWOAS). Will this proposal still be continued? To my knowledge, this motion will not be brought up in this State Assembly sitting. Will this initiative be finalised before the State election next year? In this general election, we can see that the participation of women Members of Parliament is still decreasing. Therefore, we need to bring this initiative to be discussed in the State Assembly so that it can be finalised, ensuring women's representation can reach 30 per cent after next year's State election…(interruption).
Honourable Member, please summarise.
After 14 days together with the candidate for my constituency, namely the Honourable Member at the ground, I believe YAB the Chief Minister now understands local issues and the existing situation. Therefore, in this sitting, for the first time I will not raise local issues, since we have already discussed them outside the House. Therefore, YAB can formulate policies or discuss with the EXCO Members and Government Departments so that we can resolve the delayed problems at the lower level. When problems that should be solved at the departmental level are not resolved, it is the political members who are reprimanded or scolded. As ADUN, we are not directly involved in making decisions discussed at the departmental level. Therefore, I call upon once again, I hope PDC, the District and Land Office, the Fisheries Department, the Agriculture Department, Veterinary, JKR, JPS and also MBSP are among the departments involved in the Bukit Tambun State Constituency, to resolve the delayed problems
as quickly as possible, without ADUNs needing to bring them up to the level of the House. Let us solve the people's problems at the departmental level. That is not the ADUN's problem; that problem is the people's problem, because within our pillars that were presented by YAB the Chief Minister, namely emphasising enhancing quality of life, increasing household income, and increasing resilience. Of these four pillars, three must be resolved at the departmental level. In conclusion, I once again extend a thousand thanks throughout these four and a half years to all government officers who helped handle, draft policies, and deal with local issues, and I hope we continue together to achieve sustainable development and ensure the welfare of the people can truly be enjoyed at all levels. That is all, I beg to support.
Thank you, Bukit Tambun.
YAB Chief Minister: I am not asking to reply, Speaker of the State Legislative Assembly. In accordance with Standing Order 6A(1) of the Standing Orders of the Penang State Legislative Assembly, I ask that the sitting time today, 22 November 2022, be extended until 7.00 pm.
I beg to support.
Thank you, Honourable Member and Honourable Member for Pinang Tunggal. Honourable Members, YAB the Chief Minister has moved a motion under Standing Order 6A(1) to extend the sitting time today, 22 November 2022, Tuesday, until 7.00 pm. Honourable Members who agree, say "Yes", Honourable Members who do not agree, say "No". We all agree, the motion is carried, and next I would like to ask, Honourable Member for Jawi, please.
Thank you, Mr Speaker, the Honourable Member, the leaders of the EXCO bench, Honourable Members, greetings of hope and peace. First, I would like to take this opportunity to record my highest appreciation to this esteemed House for giving me the opportunity to take part in the debate on the Appropriation Bill and the Development Expenditure Estimates for the Year 2023 tabled by the Honourable Member in the Second Meeting of the Fifth Session of the 14th Penang State Legislative Assembly, under the theme "Sustainable Development, Ensuring the Well-being of the People".
Mr Speaker, today I would like to touch briefly on a problem in the KADUN Jawi area relating to the infrastructure of fishermen's jetties in KADUN Jawi, where previously I had debated in the last sitting of the State Assembly the issue of jetties that have been built either individually, or with allocations from the State Government, or by the Department of the Malaysian Fisheries Development Authority (LKIM), or by other agencies. Up to now, in KADUN Jawi there is only one (1) fishermen's jetty under maintenance by a management body to manage it, namely the Changkat Fishermen's Jetty. Within the DUN Jawi area, during my debate in the Sitting at the previous meeting, I had informed the House that there are four (4) fishermen's jetties, of which one (1) fishermen's jetty has a management body and three (3) other jetties have no association or management body to manage them. We can clearly see the difference between the jetties managed by the Management Committee and the jetties without any management body. Cleanliness is very evident to everyone, especially to the fishermen, who can compare the jetties they use with the existing jetty, namely the Changkat Fishermen's Jetty. Mr Speaker, in my debate this time, I would like to inform the House that in KADUN Jawi there is already an addition of one (1) fishermen's jetty being built at Teluk Impir, which I was informed had been undertaken privately. If no rules are set, I am very worried that more jetties will be built without our knowledge or that of the State Government, which is responsible, especially the Department of the Malaysian Fisheries Development Authority (LKIM). I would like to inform this esteemed House that I wish to extend a thousand thanks to the Honourable EXCO for Agriculture and Agro-based Industry, Rural Development and Health of Penang, the Honourable Member for Penanti, who has helped to further add to the infrastructure at the Changkat Fishermen's Jetty by providing allocations to build four (4) units of food and beverage outlets and a slipway, namely a place to haul fishing boats ashore for maintenance purposes and a place for fish processing. For these works, the EXCO for Agriculture and Agro-based Industry has allocated a total of RM800,000. I have also been informed that these works are in the documentation process and the works will be carried out early next year, in 2023. I hope these works will be carried out according to the schedule standard and will not be delayed any further. With this infrastructure, it will attract even more tourists to the Changkat Fishermen's Jetty. The facilities that have been provided at the Changkat Fishermen's Jetty, together with its very strategic location, make me very confident that the Changkat Fishermen's Jetty will become better known with the presence of a foodcourt, a place for recreation, a place for anglers to go out to sea, and many more. As the saying goes, "tak kenal maka tak cinta", so for anyone who has never come, I welcome them. With the tarred mini road leading to the jetty concerned, it has become better and gives more comfort to the public to visit the Changkat Fishermen's Jetty. Not only that, this road also helps people living in the areas of Nibong Tebal, Sungai Udang and Parit Buntar to go directly to the Batu Kawan industrial area, which takes less than 15 minutes, compared with using the federal road, which may take more than 30 minutes up to one hour. Honourable Member, Mr Speaker, I thank the Honourable EXCO Member for Penanti, where there was a very swift action upon receiving a complaint submitted by me, namely damage to the platform at the Teluk Impir Jetty, Nibong Tebal, and a visit was carried out by the Honourable Member for Penanti in October. I understand the fishermen had submitted an application to LKIM in February earlier this year, but up to today there has been no feedback or response from LKIM to those fishermen. The structure of the Teluk Impir Jetty is old and many planks have broken, and a large part of the platform can no longer be used by the fishermen. Therefore, I very much hope the State Government can help at least to repair it minimally according to the current situation so that the fishermen in Teluk Impir can use the Teluk Impir Jetty. Once again, I would like to appeal to the relevant departments or agencies to pay attention to the matter of building fishermen's jetties that are built without approval or without knowledge, because we must look at their use in the future. If there is no proper control, I am very worried that these jetties will be abandoned and in time will suffer even worse damage, because no department or agency will be responsible for repairing them again. Mr Speaker, the people of Penang, especially the youth and young people, really need places for them to play sports such as football, badminton, futsal, basketball and many more. All of these require special courts, and the State Government through the EXCO for Youth and Sports must create more courts like these in the Seberang Perai Selatan District. I record my thanks to the Honourable Member for Bagan Jermal, who has developed the sports sector in the State of Penang at SUKMA, and at the last SUKMA the Penang State Contingent achieved very outstanding results. Congratulations and well done to all the leaders and athletes involved. Since Pakatan Harapan has administered the State Government of Penang, it cannot be denied that we have always cared and tried our very best to complete these playing courts in every district in the State of Penang. For example, the construction of the Nibong Tebal Arena, which contains nine (9) badminton courts, and also the upgrading of the basketball court in Bukit Panchor. Although these efforts have been implemented, there are still many areas that need further sports facilities. I will give one example in Seberang Perai Selatan, particularly in KADUN Jawi. In KADUN Jawi we can see football, sepak takraw, badminton championships, chess, basketball and futsal. All these games are very popular, and not only in my area; I believe in every district, in villages especially within this State of Penang, and surely there are courts for these games. In this esteemed House, I would like to share some courts that have been provided so that young people can play comfortably, such as the basketball court in Taman Berjaya Nibong Tebal, the basketball court in Taman Jawi, in Bukit Panchor, and I believe in the other KADUN areas there are also such sports facilities. These courts are often filled with young people every evening or at night, playing. As for sepak takraw courts, there are several that have been built by the State Government administration in the Jawi area, namely in Kampung Bagan Buaya, Changkat, and also in the Kampung Che Aminah area, and in Bagan Buaya there are now two (2) courts, of which one (1) court is roofed. I can see that every evening or night, many young people play, and indeed this court has been used as one of the courts for the annual open Sepak Takraw Championship organised by the ADUN Jawi Service Centre. As for futsal, it has become very popular at this time, and many young people feel disappointed because there is only one futsal court in the KADUN Jawi area, located at Padang Awam Jawi, and it is also not roofed. In this regard, I would like to propose that the relevant parties look at this matter by building more futsal courts to overcome this problem. For example, in Teluk Impian, Nibong Tebal, there is one (1) Teluk Impir Futsal Club, which many young people have joined. These young people are forced to rent a private futsal court located at Jalan Bukit Panchor to play at a very high rental rate, or to play at the Sungai Kecil futsal court in Sungai Bakap. This will burden them and is far from their homes.
Here, I would like to propose to the relevant parties that they look at this matter: if there is a plot of State Government of Penang land with an area the size of a futsal field and a suitable location, I very much request that a roofed futsal court be built next year in KADUN Jawi, as well as in Kampung Kebun Baru Byram. Recently, I received information from a casual programme with young people in Kampung Kebun Baru, where their young people really requested to welcome something being done in Kampung Kebun Baru so that the young people of this village can take part in sports to avoid them becoming involved in unhealthy activities such as becoming "mat rempit" and many more. I have made a visit to that village, namely Kampung Kebun Baru, where I have identified one (1) location that is really suitable for building a futsal court for sports for the young people of Kampung Kebun Baru. Mr Speaker, as a leader entrusted with responsibility in the KADUN Jawi area, I particularly am of the view that the construction of sports facilities needs to be expanded to the villages and hamlets as well, because many young people are very keen on sports. Whatever the sport, they need a suitable place to play. Therefore, I request that the relevant parties ensure that these sports courts can be built in line with the suitability of the involvement of the young people of the village in the sport they are interested in. Datuk Speaker, regarding the issue of flooding in the Jawi area, we are well aware that a media statement was issued by JPS Malaysia under KASA, the Ministry of Environment and Water, on 10hb November recently. Coincidentally, at that time all parties were busy with the PRU 15 campaign, but this statement was issued by JPS. The statement said that following the flood incidents that frequently hit the Sungai Jawi and Sungai Jejawi basin. The Federal Government has approved the Sungai Jejawi Seberang Perai Selatan flood mitigation plan project (RTB) under the flood mitigation programme on an off-budget basis, and the Ministry of Environment and Water. The total area affected by flooding is 78.92 square kilometres, involving Taman Sungai Duri Permai, Taman Sungai Duri Indah, Kampung Sungai Duri, Taman Jawi Permai, Taman Jawi Jaya, Kampung Setol, the Jawi settlement, Kampung Titi Hitam, Kampung Surau, the Federal Road facing the Changkat Kampung Setol junction and the State Road at Changkat, including the area, and some areas in Nibong Tebal, namely Kampung Sarang. The design of this RTB project is based on the results of the study of the Flood Mitigation and Eco-friendly Drainage System Master Plan for the Seberang Perai Selatan District prepared by JPS in 2017. I think Mr Speaker was also involved in a meeting on the study for this flood mitigation in the previous year. Up to today, the value study laboratory for the completed RTB Sungai Jejawi was held in September 2022. I would like to request that the State JPS arrange a task force for us as people's representatives from SPS, namely the Member of Parliament for Batu Kawan and also the Member of Parliament for Nibong Tebal, so that we can review more thoroughly or scrutinise the reports from JPS relating to this flood mitigation. KASA has also informed that the RTB Sungai Jejawi project is planned to be implemented on a design-and-build basis to expedite implementation, and to be completed by 2030. Upon completion, this project is expected to benefit and protect more than 6,000 residents from flood disasters, and the area at risk of flooding will also be significantly reduced from 7,892 hectares to only 790 hectares, involving residential areas including commercial and agricultural areas. The former Deputy Minister of KASA, who is also the candidate of Perikatan Nasional contesting under P.047 Nibong Tebal, has announced that KASA has approved the project at a cost of RM3.6 Billion, and the project will begin next year, in January 2023. I welcome and receive well the flood mitigation project in the SPS District, but I am very worried and confused whether this announcement of the flood mitigation project, whether this announcement of the flood mitigation project, is one of the sweet promises issued by the Perikatan Nasional candidate during the PRU 15 campaign. Are the EXCO and JPS themselves informed about this project? Who will be responsible under this flood mitigation project? I need a report or, as I have debated just now, a task force needs to be set up, a task force team that involves all people's representatives in the SPS District, including the Members of Parliament. Mr Speaker, I certainly agree with my friend, the Honourable Member for Bukit Tambun, that a Seberang Perai Transport Master Plan should be created immediately. Traffic congestion in SPS. I think it is not only in SPS but also extends as far as Bukit Tengah. It has indeed been serious these days. The transport system and infrastructure in the SPS district really need to be improved. We need more allocations from the Federation, the Federal Government, because many roads under the Federal Government really need to be improved or upgraded further, for example at Jalan FT001, Jalan Perusahaan Valdor, which leads out to Jalan FT001. We indeed face a major problem, no matter whether from the State Assemblymen for Sungai Bakap, Jawi, Bukit Tengah, Bukit Tambun, including also at Machang Bubuk. So, I really hope a Seberang Perai Transport Master Plan will be established immediately. Earlier this year, I made efforts to reopen the shortcut road linking the Changkat area to the Batu Kawan Industrial Park. The use of this shortcut has been very well received, but the maintenance cost of this shortcut road is also a burden to me. I really hope JPS can gazette this shortcut as a JPS Ban road so that JPS can help me with the users by using the allocation of MARRIS, under the MARRIS Fund, to build that tarred road. Regarding the issue of water supply, I think, as informed by the Honourable Member for Bukit Tambun, two (2) projects have indeed been carried out in the area specifically to overcome the water supply problem in the SPS area, especially in Mukim 5. Many residents of Mukim 5 feel disappointed about the water supply problems, but I urge the residents of Mukim 5 to give a little time, because the PBA (Penang Water Supply Corporation) has implemented two (2) projects to overcome the water supply problem in SPS, specifically for SPS, namely one installation of a pump at Permatang Tinggi and one project to increase treated water at the Bukit Panchor Water Treatment Plant, which is expected to be completed next August, and the pump installation will be completed this month. With these two (2) projects, I believe the water shortage problems in the SPS area, especially in Mukim 5, will be overcome or reduced. So, with this, I conclude my speech and I request to support it. Thank you.
Thank you very much, Jawi. Perfect timing. Please. You go ahead. Please, Bukit Tengah.
Thank you, Dato' Speaker, for allowing me to take part in the debate on the 2023 Budget. I would first like to state that we have recently gone through a General Election that was very challenging in the history of our nation, and also for the people of Penang. In this regard, I would first like to say a very big thank you, particularly to the government agencies involved, namely teachers, the Royal Malaysia Police (PDRM), and the Election Commission (SPR), which conducted this election very professionally. In this regard we see that although now
we are all waiting for the result of which coalition of political parties will form the new Federal Government. I would first like to congratulate all the Members of Parliament who have just won in the PRU15 General Election in Penang, and also those who took part but did not win, who have undertaken the process of participating in the most important democratic process in our country to return the mandate to the people of Malaysia. However, Dato' Speaker, I would like to state here one rather important issue that I see in the conduct of this election. This is the polarization or polarisation among the voters who took part in this election, where we see with some concern that in terms of voters' choices, these voters are divided by race and so on, and also that this election involved many campaigns using racial and religious politics, which is also rather worrying. This is something I feel that in the long term, we must hold a discussion or deliberation on how we can unite our country without taking into account the games or influence of racial and religious politics. Dato' Speaker, I think that the government in Penang and the Penang State Government is something good, namely that the Penang State Government always prioritises development and takes care of the welfare of the people without taking into account race, religion and their background. We have, I mean, heard in this honourable House how the State Government has, with great generosity and care, looked after all matters of Islamic Religious Affairs, and the religions of the various races in Penang, whether the religion of Islam, Christianity, or Buddhism, Hinduism and so on. Just yesterday we heard the speech of the Honourable Chief Minister, in which every year we see an increase in allocations for Islamic Religious Affairs. I think that if compared with other states, we are a state that spends a lot of money on the development of Islamic Religious Affairs. Every year it increases; this year, next year, we will increase to RM75 million from RM71 million, if I am not mistaken. These are the matters I see in the state of Penang, which truly looks after everyone, not only Islam but also the residents who are not Muslim. So I think, whenever we look at Penang, we are ahead in terms of the fact that many people like to come to Malaysia to holiday and come to Penang for holidays, and something that is usually when we are always appreciated and tourists are astonished is when they come to Penang they can see that there are various races, the diversity, that exist here, and everyone can live in harmony and well, and I think that is an achievement of the Penang State Government effort, including the cooperation of government agencies in Penang. This is an achievement of our state, Dato' Speaker. So, if I look at development in Penang, we lead, we indeed contribute greatly as contributors to our nation's economic development even during COVID or after COVID. We see that the unemployment rate in Penang is now among the lowest, and we still contribute the highest percentage of GDP (KDNK), among the highest in Malaysia. Every year we are contributing, the percentage is going up higher and higher, Dato' Speaker, and if we also look at the Chief Minister's speech, we see that many efforts are being made to overcome the problem of the shortage of workers' skills.
The issue in Penang is not because we do not have enough jobs. Investment that came in, in terms of manufacturing, even next year, last year RM76 billion, among the highest in Malaysia. And in terms of almost just up until the second quarter, I believe what has been announced is already RM7.9 billion, Dato' Speaker. So, all of this will generate employment in Penang for many families, especially like in Seberang Perai, my constituency has many factories, where all of us, the residents, depend on industry for their employment. So I think, just ask the State Government, which has carried out a job, the work, the effort, that is good to develop the State of Penang. Now there are a few issues that I want to raise about my constituency. The first is regarding floods. On 11 November, the whole of Penang faced floods in several places. But particularly in the Bukit Tengah area, at Taman Mangga and Taman Sentul Jaya, there were very severe floods. More than 200 people were moved to Temporary Relief Centres (Pusat Penempatan Sementara), and before this, I, yesterday, congratulated Tuan DO who is in the House today, the District Office, PDRM, Bomba, and all the other government agencies that acted quickly to help the affected areas and then quickly set up relief centres. However, Dato' Speaker, I hope that the State Government will carry out a thorough investigation, how these floods can still happen when we have already completed two (2) major flood mitigation projects in SPT, namely Parit Lima and Parit Empat. Perhaps when these projects were completed, there was no proper and complete testing. But we have seen that even though these pump houses have been completed, floods can still occur in the said areas. Perhaps they need fine tuning, perhaps they need further study. But I hope the State Government will take this issue seriously, to see how we can reduce flood incidents at several hotspots in Bukit Tengah, particularly in Kampung Dock, Kampung Tok Panjang, Kebun Nanas, and also what is now happening at Taman Mangga and Taman Sentul Jaya, Dato' Speaker. The traffic jam issue, Dato' Speaker, earlier two (2) of my friends from Jawi, the Honourable Jawi, and also Bukit Tambun, have already raised the issue of traffic jams that are getting worse. Of course we know that part of what contributes to this problem is due to the very rapid development in the Bukit Tengah and Central Seberang Perai areas. So, but this problem is getting more difficult and the people there, the residents there, are experiencing more hardship, Dato' Speaker. Every day they go to work and come back from work, they experience long hours of suffering in this traffic jam, particularly in Bukit Tengah, at the Juru Interchange and also the Simpang Ampat intersection on Jalan Bukit Tengah and Jalan Cheng Heng Kai, and all the way to Permatang Tinggi. So, I hope that although I know this is also subject to the allocations received by the State Government and also from the Federal Government, nevertheless, I hope the State Government will continue to give attention to see how to solve this problem. Yes, please proceed.
Thank you. Excuse me for interrupting. Does the Honourable Member agree with my view that a mistake or a wrong calculation has occurred in the mitigation planning of this TIA? If a TIA had been done, this matter should not have happened. Every development that has a TIA, when the TIA is done effectively, it will not produce results like this. So, does the Honourable Member agree that this TIA needs to be extended further? I mean it needs to be expanded further. If this TIA is effective for five (5) years, we must do this TIA for a period of 10 years or 20 years so that this problem does not come quickly. Thank you.
I very much agree that there must be systematic planning when making or doing planning, there must be long term planning, not short term planning. And I hope that later on, the responsible EXCO can also answer, taking up the issue that has already been raised by the Honourable Member, the Honourable Bayan Lepas. Traffic jams. So, I hope this is something the State Government can look at and resolve. Another issue that I want to bring up concerns Basic Services and Basic Amenities such as drainage systems and cleaning in village areas. Dato' Speaker, we have 638 villages, if I am not mistaken, across Penang. And a large part of these villages are in Seberang Perai and also in my constituency. Previously I proposed that the State Government could consider preparing a Master Plan for the Improvement of Villages in Penang. I think this is very much needed, considering that a large part of our residents live in villages. I think this is also something when the Honourable Chief Minister came to campaign this time at Batu Kawan and my constituency and perhaps other villages. He himself saw the condition of the villages, the roads and also the drainage systems that I, that I think really need to be upgraded. So, maybe we can have a master plan for all the villages, and this also involves things like cleaning. Cleaning services, the services provided by MBSP now, what services can be provided by the District Office is limited? And in the villages we see that, of course, unlike housing estates, the system of collecting rubbish, for example in housing estates, they do it house to house. But in the villages, they put one (1) large communal rubbish bin far from the houses in the villages. I don't see why it cannot be implemented house to house. If we have political will, of course this can be implemented, and there are also several other states apart from Penang that have implemented this. So, I, yes?
Thank you, Honourable Bukit Tengah. I agree with the view of Bukit Tengah, because in Seberang Perai we do have village houses or villages within our area. As was agreed previously, when I was a Councillor, Dato' Deputy Speaker and whoever else, Jawi, when we were Councillors of Seberang Perai Council, there was a policy stating that when we apply to MARRIS, road cleaning that has been gazetted under MARRIS will be carried out by the MARRIS contractor, and the Council staff or Council employees will be deployed for cleaning work inside the villages.
This is what was agreed, I still remember we agreed at that time in 2017 or 16 if I am not mistaken. But what we see is that this practice is no longer applied. And when we call MBSP to do cleaning, they say this village area is not under our maintenance. But what we previously acknowledged and had agreed to was for the Council to enter at least once a week. Enter and clean the roads, drains, ditches and so on. Why this policy is not implemented, I too do not know. The Council has forgotten this policy that was made, or perhaps they have other reasons, we are also not sure. But what I agree with Bukit Tengah on is that this needs to be practised at least once a week, because indeed the rubbish or cleanliness in the village is not as bad as in urban areas. But MBSP still needs to provide services as agreed, because that is why they take the allocation from MARRIS, for areas that have been gazetted within the MARRIS area. Why they do not enter, I too do not know? Do not use the excuse that village people only pay quit rent of RM5.00 or do not pay at all, since the State Government gives exemption from payment of quit rent. So, we don't want to hear this excuse, and I think we, the State Assemblymen from the Seberang area, are unanimously in agreement that MBSP must provide services to village houses as well. I support the comments from Bukit Tengah. Thank you.
Honourable Member for Bagan Dalam, to inform this honourable House of what has already been discussed and decided in MBSP previously. I also very much hope, because we are not only looking after the gardens but we must also look after the quality of life in the villages. As I said just now, it concerns a large group of residents in Penang. These are basic necessities, basic services to improve the quality of life of the village residents. So, I hope this matter can be looked at seriously by the State Government. Another issue I want to raise concerns services or assistance from the Department of Social Welfare (Jabatan Kebajikan Masyarakat, JKM). We are aware that the Central Government or the Federal Government has already set the Poverty Line Income at a value of RM2,208.00 as the household income. That is what the Federal Government has already set previously. Nevertheless, we see that the Central Government is still failing. Failing to implement the assistance that JKM can provide to those whose household income is below RM2,208.00. This is a big issue. When this happens, it means that many people who need assistance cannot receive assistance from JKM. The practice right now, Dato' Speaker, is that only families with a household income below RM1,169.00 can receive assistance. And we know that now, after COVID and the economic challenges that the country is facing now, many groups, families, need assistance. But with the setting of that policy, many more residents in Penang cannot get assistance from JKM. I do not blame the officers or the officials in JKM. They are only the implementing agency, and we also know they feel they are under pressure because the allocation given to JKM is in fact insufficient, and the human resources, the officers, are also insufficient to solve these problems.
When they are totally understaffed, Dato' Speaker. But, returning to the policy for providing this assistance, I think perhaps the government can also look at, look again at the assessment for providing assistance. Now there are two types. One (1) according to household income, as I said, RM1,169.00. The other that they use to assess whether a family can receive assistance is according to per capita. The Central Government now sets the per capita for each individual in a household at RM369.00, if I am not mistaken, and in Penang we have set it at RM260.00. I may be wrong, perhaps later the Honourable EXCO Member can clarify, but in the current situation, with the per capita of RM260.00 and also RM1,169.00, only people in the very poor group are eligible to receive assistance. And we as ADUNs (State Assemblymen), when we go into our constituencies, our villages, we often meet many residents who tell us that they have already applied to JKM for various assistance but cannot get it because the criteria they set, Dato' Speaker, are too high. It is time that we give more emphasis to the reform and restructuring of our JKM system so that more assistance can be channelled to residents who really need it. And finally, perhaps I just want to touch briefly on another problem often experienced in my constituency, which is foreign workers. Recently, even before the election, there was in the newspapers a report describing Taman Nagasari now in Perai as a kind of hell garden. This stems from the fact that many foreign workers are now being placed in housing estates, and we certainly know that, as in Perai and many other places in my constituency, these are industrial areas. So indeed many come there and stay there, but what I have observed, the problem is two (2). One, there are irresponsible employers who simply place these foreign nationals in housing estates without any supervision. They just leave them there, in many cases in houses in terrible condition, with no monitoring and no advice given to them. And this is a problem because subsequently, when social problems arise involving these workers, it is the local residents who will suffer. They experience various problems. So in this issue, I have previously raised this issue with the hope that government agencies such as MBSP and especially the Department of Labour, Sumber Tenaga, what is this, English is human resource.
Deputy Speaker: Human resources.
Member for Bukit Tengah (YB. Gooi Hsiao-Leung):
JTK, this one. They have many powers under the Act to take action when these employers place workers in unsuitable places. So, carry out enforcement together with the police and MBSP. What is this, joint, the "reading raid", go and carry out investigations, arrests and so on, so as to hold these employers accountable for their foreign workers. That is the first. And the second, I also think we must look at how, in the long term, we want to solve this matter, and I hope the State Government will give due attention to solving the problems of foreign workers who live in housing estates. Not all of them, but quite a number of them also cause social problems in local areas, and I hope a solution or resolution can be found.
Deputy Speaker: Thank you, Bukit Tambun.
Member for Bayan Lepas (YB. Azrul Mahathir bin Aziz): Yes, just a little.
Deputy Speaker: I guess the question on these foreign workers is raised in every DUN, and the answers are similar too.
Member for Bayan Lepas (YB. Azrul Mahathir bin Aziz): Dato' Speaker, I have one (1).
Time is up, so I ask everyone to sit down and we will continue with the Constituency Members.
Member for Bukit Tengah (YB. Gooi Hsiao-Leung): No, he may have Bayan Lepas.
Member for Bayan Lepas (YB. Azrul Mahathir bin Aziz): No, I don't.
Deputy Speaker: No, it's the same as Bayan Lepas, isn't it? Also talking about the workers' hostel that will be coming up in Bayan Lepas.
Member for Bayan Lepas (YB. Azrul Mahathir bin Aziz): No, no, this is not related to Teluk Kumbar. I just want to inform how necessary supervision and coordination are, as YB. Gooi just mentioned. If it comes to hostels, as I saw for myself in Batu Maung, they still come and go freely. That is their social problem. So what is most important is coordination and enforcement. That is the most important, no matter where they live, even in any housing estate. If there is enforcement, if there is someone who takes care of them, InShaa-Allah, bad things will not happen. Even if they live in a big hostel, if there is no supervision, they can come and go and so on, it will become an even bigger problem for the surrounding community. That is what I wanted to convey.
Member for Bukit Tengah (YB. Gooi Hsiao-Leung):
As a conclusion, I hope MBSP will also take action. I know MBSP is trying their best, but they must continue to monitor and solve this matter.
And finally, Dato' Speaker, I congratulate our Yang Amat Berhormat Chief Minister, who won handsomely in Batu Kawan. And as for me, he has come to Batu Kawan, he is walking the walk. He always says that Batu Kawan and Seberang Perai are the future of Penang, and we very much welcome the coming of our Chief Minister to become the Member of Parliament for Batu Kawan. And lastly, I support the expenditure that has already been tabled by the Yang Amat Berhormat Chief Minister. Thank you.
Deputy Speaker: Thank you, Bukit Tengah, and next, the Member for Bertam.
Member for Bertam (YB. Khaliq Mehtab bin Mohd. Ishaq): Thank you, Dato' Yang di-Pertua Speaker. Bismillahirrahmanirrahim, Assalamualaikum Warahmatullahi Wabarakatu, Salam Sejahtera. Alhamdulillah, we give thanks to the Divine for, by His abundant grace, this sitting of the Penang State Legislative Assembly has been able to proceed smoothly. The 15th General Election (PRU15) has come to an end, yet its heat is still felt because the formation of the new Central Government has not yet been carried out. Bertam calls on all Malaysians and Penangites to pray that the government to be established will be a caring and clean government for the stability of the country. Bertam expresses thanks to all Malaysians who have fulfilled their responsibility to go out and vote to ensure our future is secured. Dato' Yang di-Pertua and Honourable Members, there are several matters that Bertam wishes to raise in this honourable House concerning Bertam itself. Bertam wishes to touch on infrastructure in the Taman Rupawan area. For the information of Dato' Yang di-Pertua and Honourable Members, the shortcut road from Taman Rupawan to Pusat Bertam Perdana is an alternative route frequently used by residents around Pongsu Seribu, Taman Seri Serdang, and Taman Rupawan, and it has even become the main route for residents who want to go straight to the city centre of Bertam Perdana. Through this kiosk road, this is, sorry, this road is a very important road used by road users every day because this road is a quick and safe shortcut. However, when this area is used as an alternative route, the junction leading from Taman Rupawan to Pongsu Seribu or Jalan Pajak Song is also affected by the number of vehicles passing along that road. That area becomes congested at peak hours. Therefore, Bertam once again wishes to request that the authorities look again at the need to install traffic lights at the exit junction to Pongsu Seribu, Jalan Pajak Song from Taman Rupawan or Taman Seri Serdang. Bertam also wishes to draw the attention of the Seberang Perai City Council to inspect and monitor the roads under the supervision of the Seberang Perai City Council (MBSP). For your information, the road in front of Bank Islam, Kepala Batas needs repair because the area is a hotspot and its road is pitted. Complaints from residents and road users of that road have also been submitted to the Seberang Perai City Council (MBSP), but there has still been no proper reaction or response. Dato' Yang di-Pertua and Honourable Members, we are talking about sports that build relations between races in our country in general and our state of Penang in particular. Bertam wishes to draw the attention of the Penang State Sports Council to look at
and inspect the State Sports Council courts at Titi Mukim. A cursory survey of the court shows that it does not seem to be fully used. The hall in that area is poorly maintained and needs repair, and it is rather unfortunate that we have courts and halls but they are not used optimally. Bertam hopes that the parties responsible will give more attention to these existing courts. And martial arts such as silat, karate, judo, muay thai and so on should be encouraged at all levels. What Bertam observes is that Malay silat is rather marginalised in terms of training facilities. The courts available are very uncomfortable and no longer suitable for use, and Bertam takes as an example the silat court in the village. The court is open and only fenced with a roof or zinc, with no flooring at all, mat…(with permission), when training, in short, safety during training at the court is not given much importance. Bertam's question is whether these silat associations are registered with the Penang State Sports Council, or whether they do not need to register, or how it is. If registered, can they obtain or receive grants or contributions from the State Government. Dato' Yang di-Pertua and Honourable Members, Bertam wishes once again to draw attention to the floodlights at the Seberang Perai City Council Football Stadium in Bertam. This issue has previously been raised regarding the application for this facility to be provided. As we know, that area or that stadium is used for football, but it would be good if floodlights could be provided so that football can also be played in the evening and the stadium can be used to its best potential (to usefull potensial). Bertam hopes that this application can be given serious attention, and Bertam hopes that a firm answer or a specific answer can be given as soon as possible. And Bertam also requests that the field for lawn ball, sorry, at the MBSP complex be repaired immediately, as this is the only field for lawn ball for us to train in North Seberang Perai, and the initiative of the EXCO Office for Youth and Sports to expedite this restoration or repair process is very, very much hoped for. Dato' Yang di-Pertua and Honourable Members, the area of Padang Benggali, which Bertam proposes as an eco-tourism area, still has no definite answer yet. The area from Padang Benggali to Kuala Bekah is an area of growing api-api trees and must not be disturbed. This area also has its own attraction, namely the presence of migratory birds that stop over in that area. Therefore, Bertam requests the State Government, through the EXCO for Tourism, to assess the suitability of this area to be developed as a tourist attraction. And for everyone's information, Bertam has a network of attractions that are no less impressive, and if they are developed like the Padang Benggali area, Kepala Batas town could be made a Heritage Town, the Bertam Herb Garden, a network of two- to three-star hotels as well as budget hotels, and also the food hub at Kiosk Bertam. Bertam has previously proposed that a study be carried out to enable Kepala Batas town, which is famous for its own history, to be made a Heritage Town. Kepala Batas is the birthplace of the religious scholar who set the date of our country's independence, and Kepala Batas is a town with a historical connection to our country's independence. The birthplace of Tun Abdullah Badawi, the former Prime Minister of Malaysia, the historic house that is the birthplace of Yang Berbahagia Tun Abdullah Badawi, should also be given attention. Make this house an attraction for tourists from within or outside the country. This birthplace can be preserved as part of Malaysian and Penang history, as was done for the birthplace of Yang Berbahagia Tun Mahathir in Kedah and other figures throughout the country.
Kepala Batas is also the place where the famous party ghazal phenomenon began some time ago, and unfortunately at this time, there is no longer any YouTube channel or Facebook, Instagram and so on. If there were, this would be an extraordinary phenomenon. Efforts to introduce Kepala Batas as the birthplace of the party ghazal group as cultural heritage have been made by several NGOs, but these efforts have gone nowhere because of a lack of support from the State Government, and Bertam hopes and proposes that the efforts of these several NGOs will receive attention from the EXCO for Tourism. This Malay heritage in Penang must not be allowed to be wiped out. Therefore, once again Bertam requests that the State Government assess and consider making Kepala Batas town a historic Heritage Town. The row of shops from the colonial era still remains around Kepala Batas town, although it is not as grand as Armenian Street, but those remnants still exist and can still be felt. In conclusion, Bertam wishes to extend millions of thanks to all the PRU machinery of Perikatan National in Kepala Batas, and all the supporters and voters who joined hands and worked hard to ensure the victory of Perikatan National in Kepala Batas. Bertam is proud to be part of the strong team that has created history in Kepala Batas.
The desired shoot, the herb comes unbidden, The pauh shoot, the pomegranate on the stone.
Although Bertam is in the opposition here, we remain united. That concludes my speech. Wabillahitaufik Walhidayah Wassalamualaikum Warahmatullahi Wabarakatuh.
Thank you, Bertam. Continue, Honourable Member for Batu Lancang or Pulau Tikus.
Batu Lancang has already spoken earlier. Thank you, Dato' Deputy Speaker of the State Legislative Assembly. First of all, because we are also in the World Cup season now, I hope Dato' Deputy Speaker can give injury time for my speech.
But not like yesterday, right, 14 minutes and 10 minutes, sorry.
It's okay good afternoon and greetings of peace Dato' Deputy Speaker and Honourable Members. Our country is still in a situation of uncertainty now. We have just finished the 15th General Election, and the situation around everyone is not yet settled and remains pending. But we can take comfort that the State Government of Penang remains intact and unaffected, and is still fighting for the rights of the people of Penang. The people of Penang will always receive stability from our Government. Since 2008 we have all indeed brought stability and progress, and that is precisely why, when the state election comes next year, we are not afraid and will continue to give the people the right to choose. We believe they will choose us again as the State Government of Penang, because the success of the State Government of Penang simply cannot be compared, one can see it. Among the issues we face in this administration, because every administration has the opportunity to make improvements.
I would like to thank the Most Honourable Chief Minister for tabling the 2023 Budget at a time like this. A strong budget will give assurance to the people of Penang. Congratulations to the State Government of Penang, because under this state's leadership we have become the leading exporter, with a contribution of 33.2 per cent of the country's export value as of September 2022. Dato' Mr Speaker, among the greatest and most important assets for us in Penang are the talents of our young people. These talented young people are very precious, and if we lose them, not only to the capital city but to neighbouring countries, it will be very difficult to get them back. Perhaps one generation will still return, but if future generations, we must face the reality...(with permission), that if they settle in other countries, they will most likely not return. So we must work hard to ensure that our talented young people can remain in the State of Penang and contribute to our economy and to our future, because a state or country without talented young people simply cannot, simply cannot move forward. This is something important, but we hope that from the State Government's side, we can do our part. We will try our utmost to retain our young people, but I hope that from the Federal Government's side, they will also do what is right on this issue. Do not, just because there are issues where there are not enough manpower for certain jobs, open it up to foreigners to take those jobs, because we can see in other countries that if there is income from talented foreigners, skilled migrant workers, they may be able to contribute to the economy and help us learn a new skill set. But if what is brought in is only unskilled migrant workers, we will certainly become trapped in an economy. So, before we talk about bringing migrant workers to the State of Penang, we should concentrate first on retaining talent here, and that is something we cannot take for granted, because innovation is important. Without innovation we cannot learn new skill sets. But if talented young people cannot see that the opportunities or recognition for their talent are not valued here, they will certainly look for another place, because many have already gone to other countries to study a field that has no market here. So when they come here to look for work, they simply cannot find work that requires their skill set, and they are forced to go elsewhere. But if we can learn your hardness skill set, this new one, for our economy, perhaps we can attract them to return, because we can see in other countries they are always looking into new skill sets, new industries, new innovations. We too must move forward. I know the Penang Digital State Government has taken many steps for hardness innovation, but we still have a lot of work to do, lah, to retain our talent, because even in our own generation there are many who always tell young people, once you have studied at a high level, go and look for work in another country and do not come back. This is not something I want to hear in the coming years already, alright? Because the State Government of Penang has provided many new opportunities that, before we took over the government in 2008, simply did not exist. Now we have hope in the State of Penang, too, intended. Also, we must study why other countries are able to entice or attract our talents. What do they have that we don't have? We have to learn from them, because it is not only about looking at the exchange rate. We know that the ringgit is under-performing right now, but that is not the only reason. There must be reasons why we are still lagging behind in that situation.
I would like to congratulate the State Government of Penang for continuing the Penang Future Foundation scholarship programme and institutions such as the Penang Science Cluster and Tech Dome. This will ensure that our young people will have an interest in innovation and will also move into industry in the field of science. But it's still the overall big problem that we still have to work on, and also what is stopping people from being attracted from here. We can also attract from other places, and I believe Penang is an attraction for talented young people from the northern region of Peninsular Malaysia, indeed, because we are the most successful government in this area, and I believe I can say the Penang State Government is the most successful state government in the whole of Malaysia. Dato' Mr Speaker, I would like to express my thousand thanks to the State Government of Penang for always being caring towards the disabled community, or OKU. As an elder brother to a younger sister with disabilities who has autism, I will always fight for the rights of persons with disabilities until universal design is fully achieved. Many do not understand the importance of this universal design, but even though we still have full ability now, one day everyone will become old. As age increases, our ability for accessibility will become more limited. I hope the State Government will constantly improve our accessibility audit checklist by comparing it with the methods of other states or countries. I feel that if we want to compare, we must compare with other countries, because comparing among states, Penang is simply the greatest, Penang Leads. I also hope the State Government can strengthen enforcement power by appointing full-time inspectors for universal design to ensure compliance with this audit checklist. Dato' Mr Speaker, I would like to ask the authorities, whether state or federal, to also help in the Pulau Tikus state constituency (KADUN). There is only one place that frequently floods, namely the Tanjong Tokong area, the Kampung Masjid area and its surroundings. We indeed know that drainage infrastructure is the cause of flooding, and this is not something new, and there have been many already, close by. I hope that because of the perfect storm of high tide and heavy rain, flooding will occur. It is not as frequent as in other places, but it is still something we can see, and we should try to make improvements. I hope the federal authorities will also help with a larger allocation for flood mitigation across the whole State of Penang. Let us all serve together for the safety and comfort of the people.
Dato' Deputy Speaker, Persiaran Gurney or Gurney Drive is a place that is close to my heart. It is really painful that before we took over the State Government in 2008, the previous administration destroyed Gurney Drive. I would like to express my thousand thanks to the Pakatan Harapan State Government, which is implementing the Gurney Wharf project so that Gurney Drive can shine again. To the critics who previously looked at it and gave many negative comments, I said, if you are not from around Gurney Drive, please do not think you know how it feels to see it being destroyed. Okay, I have seen the destruction of Gurney Drive during my school days, and I have seen that it is truly painful. Those critics simply do not know. If you prefer the rubbish and mudflats, I do not know what you are talking about, lah. This project will become our new legacy. I am very proud to be the State Assemblyman for Pulau Tikus from Pakatan Harapan, bringing reform, not the other administrations that brought destruction. Dato' Deputy Speaker, I still hope that the State Government will meet directly with stakeholders in the arts industry, not only in visual arts but also in performing arts. Until now, many artistes still need help in every performance. They come to meet me because, from the past, I have been a performer in this performing arts field, so old friends always come looking for support, not only in financial terms but also in publicity, which is very important, because they say that our economy here is still not sustainable for them to survive as full-time artistes. They are willing to perform, and some are willing to perform in Kuala Lumpur and other countries. They say that exposure and spending here, the level of spending here, is not enough. I will continue to fight for their rights, and I hope that in terms of publicity and also support, the State Government will indeed help more, not only according to how to say companies that promote this art, but also by continuing to negotiate with stakeholders in this art. These artistes sometimes want an outlet to voice the issues they face, and we, as a people-centred State Government, must invite all artistes in this industry to a session of dialogue or a forum.
Dato' Deputy Speaker, I hope the Local Authorities (PBT) will always raise the level of cleanliness. What distinguishes our administration from other administrations is not only a clean administrative system, but also that we ensure the environment is clean. I thank the PBT workers who work hard to keep the city clean, but with every or all the performances we have achieved, everything can still be improved. I also hope the State Government will increase the allowances of Councillors, although the allowances of PBT Councillors are already among the highest in Malaysia. However, if we want to attract or entice new talents to help us in the administration of the state that we love, we should also be prepared to compete with the private sector for these talents, because the private sector will certainly pay higher salaries. And when we want PBT Councillors to serve the people full-time, we must also consider the burdens they face. If we want the best talent, we should also be prepared to compete with the private sector.
Dato' Deputy Speaker, among the main problems in the State of Penang is the increasing traffic issue. The success of the Penang State Government administration has attracted many people from all over the northern region of Peninsular Malaysia, as I raised earlier, especially to come looking for work, and with this also come many cars and a large population increase throughout the State of Penang. Therefore, this traffic problem will continue to increase. I am very grateful to the State Government of Penang for building many new routes, the elevated road, and also the Penang, of course you know, our Master Plan that we have long wanted to implement, but I hope it will be accelerated, because this traffic issue is increasing, and we must do what we can to help our people. Because we know what the critics say about our Transport Master Plan. They say it is a waste of time, that it is all about the environment, cycling. I have never seen a critic who cycles, but many comments come from them. We, as the State Government of Penang, have been chosen by the people to enhance their lives, not to burden them. If they want to say that traffic jams are normal, I would like them to try it every day going to work and coming back. We must accelerate what we can to ease the burden on the people.
Two (2) years of COVID-19 have added many burdens to our people. Many factories and jobs, and many are now rebuilding their lives. We should help them, and one of the best ways is sustainability. Earlier I spoke of accessibility, I spoke of it for persons with disabilities. Now accessibility to go from point A to point B for work, this is very important, because the economy runs fast, economy time is money in economy. If we are only slow, we will certainly lose the opportunity to compete with other places in globalisation. We can see now that there are countries that previously, you know, were not competitors to us, have already become competitors. Competition will certainly increase from time to time. Our country's economy is still not enough, our economy is still not large enough to provide job opportunities for all the people.
Therefore, we still need FDI. Because we need FDI, we are not short of competitors from other countries for this same FDI, you know. Therefore, we must accelerate the upgrading of our infrastructure, not only public transport infrastructure but also infrastructure for connection from point A to point B...(disruption).
Honourable Member for Pulau Tikus. One more minute.
How many minutes of injury time?
Six minutes have already passed, one minute left.
I thought it was still World Cup season, so you can give more. Dato' Deputy Speaker, the people have chosen us to administer the State Government of Penang for five (5) years. Now it is the fourth year, the middle of the fourth year, and our aspiration and that of everyone here, I believe, is to fight for the progress of the State of Penang, which we all love together. It is clear from the results of the recent General Election that the people of the State of Penang still place their trust in us, and we will not betray the people's mandate like some Nasional traitors. We will continue to fight for the rights of the people of the State of Penang and also to improve their daily lives. That is the foundation of our struggle as People's Representatives of Pakatan Harapan. With this, I respectfully move to support. That is all, thank you.
Thank you, Pulau Tikus. Continue with the Honourable Member for Pengkalan Kota.
Thank you, Dato' Deputy Speaker. Thank you for the opportunity and also the chance to take part in the debate on the Appropriation Bill and the Development Estimates 2023, which were tabled by the Honourable Chief Minister on 21 November 2022. Here I also extend my congratulations and well done to the Honourable Chief Minister, who has succeeded in tabling the budget for the fifth time under the theme "Pembangunan Mampan Mensejahterakan Rakyat". I wish to commend the state government under the leadership of the Honourable Chief Minister, which has adopted an inclusive approach by holding engagement sessions with stakeholders and the agencies involved in formulating the budget tabled here for the year 2023. In this post-COVID-19 pandemic era, our country faces various challenges, particularly economic challenges, where the weakness of the ringgit has resulted in higher raw material costs and in the implementation of development projects for the people of Penang. Every sen spent at present is of different value compared with every sen we spent before the COVID-19 pandemic struck, but I am confident about this budget, in which, although we have tabled a deficit budget, I am confident this shows the determination of the Penang State Government to continue our development agenda for the sake of the people of Penang whom we love. I believe that in this way we can, directly or indirectly, provide an injection to economic and social development in the State of Penang at a time when our country faces an uncertain economic situation.
Dato' Deputy Speaker, the 15th General Election (PRU15), which has just been finalised, is the first GE held in history that was not held together or simultaneously with the Penang State Election. I would like to take this opportunity to thank all the people of Penang who gave strong support to Pakatan Harapan, which won 10 of the 13 Parliamentary seats contested in Penang. The results recorded in this General Election are an indication to everyone that efforts or work should be enhanced in preparation for facing the State Election that will be held next year. We can take the decision made by the people of Penang through the General Election for Parliamentary seats this time to look again at the matters that must strengthen, reinforce. Actually, I feel this election is a midterm election, particularly for the State Legislative Assembly seats in Penang, and we need to take lessons from it to further improve our particular weaknesses. Nevertheless, I feel very worried about the dissemination of inaccurate information based on race, extreme religious sentiments and its impact on our society, particularly on the youth. Earlier, my colleague from Bukit Tengah also raised his concern, and in fact we can see on new social media platforms such as TikTok that racial and religious sentiment issues have flared up, and this is certainly a negative situation, particularly for the multiracial and peaceful Malaysia. The issue of widespread money politics has also tarnished the democratic electoral system of our country. Let us not gamble away the future of the country merely for the benefits right before our eyes now. Our beloved nation Malaysia deserves positive politics that is better than what we see today. Do not jeopardise the progressive and democratic Malaysia by using extreme racial and religious issues.
Dato' Deputy Speaker, I also wish to record my thanks to the State Government, because in the budget that has been tabled, maintenance work for public and privately owned housing projects has also been given priority by the state government, with an allocation of as much as RM13 million for construction work, upgrading and maintenance of low-cost housing projects, and RM6.8 million has been allocated to the maintenance fund, with a maximum of 80 per cent, to help particularly projects for Low-Cost Houses and Lower-Medium-Cost Houses whose original selling price did not exceed RM150,000, to assist them in the upgrading and appropriate maintenance work. The continuous maintenance project by the State Government, and also at some time in the past carried out by the Penang Development Corporation (PDC), has borne fruit, because this year all the eligible housing schemes in the DUN Pengkalan Kota area have received at least one maintenance project as a result of this good policy and approach, and this project has also been carried out through a cost-sharing method, or as they say, with permission, cost sharing, together with the relevant management corporation or joint management body.
The impact of this maintenance project can be clearly seen, where apart from ensuring that all the lifts can function properly, we also see its effects, for example recently when the State of Penang was hit by water supply problems caused by the floods that struck the District of Baling. We can see that there are flats and apartment schemes where their water tanks have been successfully maintained and their water tanks function well. Residents in that area do not need to worry about this interrupted water supply, because as long as the water tank functions, they still have water storage for at least 24 hours. I feel this is one of the results of the continuous efforts of the State Government in channelling allocations to assist maintenance work for these apartment blocks. So we see that these schemes have received benefits, but we also need to look at the schemes that were developed by the Penang Development Corporation (PDC), where I understand that originally PDC also played such a role, through a partnership method with the Management Corporation or Joint Management Body to carry out maintenance of facilities and infrastructure. However, this role, since the operation of the Penang State Housing Board (LPNPP) officially in 2021, has been handed over to LPNPP. But I also want to take this opportunity here to call upon the Penang Development Corporation (PDC) to speed up maintenance work, specifically for the Pangsapuri Pelangi project, where originally, when we helped to establish the Management Corporation, one of the commitments given by the Penang Development Corporation (PDC) was to help carry out maintenance work for the scheme, and not forgetting the Cluster housing area at Pintasan Cecil, particularly in terms of the condition of the drains and gutters, which have not been upgraded for a long time, and also the main roads in the Pintasan Cecil housing area. I hope PDC can play its role and take immediate action to further improve the conditions and facilities in that area for the well-being of the residents of the local area.
Dato' Deputy Speaker, the Clan Jetties area, which is a focal point for tourists from within and outside the country, has been restored to its vibrancy in the post-COVID-19 pandemic era. As mentioned by the Honourable Chief Minister when tabling the budget, regarding how brisk the tourism or cruise ship tourism is, berthing at this cruise ship terminal. Where the Clan Jetties area is the tourist attraction closest to this cruise ship terminal, where by walking these tourists can reach Clan Jetties, and the best part is that this is a free attraction, free for these tourists. However, the economic challenges as I mentioned earlier have caused the costs of maintaining facilities and infrastructure in the Clan Jettie area to keep soaring, where one of the very important issues is the supply of Cengal Batu wood, which is the only raw material used for the maintenance of jetties and the maintenance of residential buildings in the Clan Jettie area. So this is not only limited in terms of supply, its price has been raised, but the stock or supply available in the market now, the wood has not yet reached the appropriate age. Because when the price of this wood is high, some people rush to sell, to prepare the supply first, but they have forgotten that if the tree, the age of the wood, has not reached a suitable level, when it is exposed to water it will swell. So that is among the major challenges, particularly for maintenance in the Clan Jettie area. I would also like to take this opportunity to thank the Honourable Chief Minister, who is a former Member of Parliament for Tanjong, and the relevant agencies, because since 2018, over these few years, they have succeeded in carrying out jetty maintenance work at Ong Jettie, Lee Jettie, Tan Jettie and Yeoh Jettie. Not forgetting the assistance of the village house repair project under MMK Pembangunan Desa, chaired by the Honourable Member for Penanti, where several dilapidated houses within the Clan Jettie area were also successfully given appropriate maintenance work to help particularly low-income residents in that area. However, one issue that is often raised when we talk or question the sustainability of residents in the Clan Jettie area is closely related to temporary occupation licences in the area. As we also understand, and we also accept, there are certain conditions that allow an individual to submit an application for a temporary occupation licence from the District and Land Office and also from the State Government, but my concern is that the conditions imposed will have an impact, particularly on the next generation of the original occupants in the Clan Jettie area, who most likely already own property or houses in other areas of Penang. To avoid a situation like the one we can witness in the Sardinia area, in Italy, where the government there offered as much as Euro15,000.00 to attract new residents to return to that village area to settle, and the same situation we have witnessed in Japan, where the phenomenon (with permission)… known as Ghost Village or AKIYA also saw subsidy incentives introduced in terms of offering houses at low prices or providing maintenance subsidies to residents so they return to housing areas or villages whose houses had been abandoned, in order to sustain those housing areas. So, to ensure the same situation can be avoided in the Clan Jettie area, I feel that an early plan needs to be looked at by the State Government to avoid the situation I mentioned earlier. I would like to take this opportunity to propose that agencies such as the Chief Minister's Corporation could examine the feasibility of implementing an appropriate and reasonable lease term, and we could also impose appropriate conditions, for example in terms of the period of determination or maintenance, to guarantee the sustainability of the Clan Jettie area.
Dato' Deputy Speaker, the derelict heritage buildings in the George Town city area are also one of the main issues that are often raised, where there are derelict building units that have been abandoned by their original owners, perhaps due to certain reasons or factors. Sometimes it may be a legal matter concerning their heirs, and there are some among them who are also waiting for a better market price before being able to make any decision on whether to sell the building or not. According to the written reply I received, the Penang Island City Council (MBPP) has identified as many as 70 derelict heritage buildings within the George Town area, and in the reply given, legal measures such as Section 82, Local Government Act 1976, and also Section 83, Street, Drainage and Building Act 1974, are the main methods by which MBPP can take action against these derelict heritage buildings. But I feel that we could do much more to address the issue of these abandoned derelict heritage buildings. Recently, on 14 November, a derelict heritage building suffered damage when a large tree within the compound of the building fell at Jalan C.Y Choy, and fortunately the damage did not result in any accident involving road users, namely at Jalan C.Y Choy and also near Gat Lebuh Noordin as well. I take this opportunity to thank MBPP, which took immediate action to clear the fallen tree
through the Landscape Department and also the Building Control Department, which had also issued notice after notice to the building owners, but no action has yet been taken to prevent this from happening. I feel it is time that more drastic and active action be taken to prevent this incident from happening. The situation of these derelict heritage buildings is not only a threat to road users and the neighbouring lots close to this building, but it also has an impact that I consider rather negative, particularly on the scenery around the George Town city area, this heritage city. So I hope the State Government may be able to put forward proposals or take more firm and active action to ensure these derelict heritage buildings are not left alone like this. Dato' Deputy Speaker, the maintenance of utilities such as electricity, water and sewerage, and also telecommunications, particularly in the George Town area, is a major challenge, where we are faced with the built environment, or as they say, with permission, Build Environment, and also an increase in demand and usage with the emergence of new residential and commercial schemes. I still remember this issue was once brought to this august House, and the Honourable Member for Tanjong Bunga this morning during the oral question session also answered the question raised by the Honourable Member for Pulau Tikus about the very same issue. Where there is a committee monitoring, particularly the works carried out by various agencies and various parties in the maintenance of utilities in the George Town area. But I feel that, although there is a committee, we still face constraints in terms of allocation or different timing for the agencies involved to carry out maintenance work simultaneously, or at the same time, and… (interruption).
Honourable Member, one more minute.
Yes, I am almost finished, do not worry. This issue involves not only the utility agencies but also agencies or private sector developments, where among the conditions imposed on them on their planning permission applications is to maintain or add to these utilities and infrastructure in the George Town area. But I would like to take this opportunity to thank MBPP (Penang Island City Council) for not hesitating to take action by issuing stop-work notices for development and infrastructure maintenance works that have had a negative impact on residents and road users around George Town. However, I urge that these matters be closely monitored by all the relevant agencies, especially when the infrastructure maintenance works are being carried out. Recently we faced an issue concerning IWK (Indah Water Konsortium). Although we look at the map or, (with permission).. mapping, that has been prepared, please understand that George Town has seen a lot of development and planning carried out after a long time. Even if we follow the mapping, when looking for a manhole the location can sometimes be wrong. This is a problem that really happens, where the cause of the damage still cannot be identified because the mapping does not follow the built environment on this site. So I hope the State Government may need to monitor more closely to prevent such issues from happening.
Honourable Deputy Speaker, one of the issues I want to raise for the attention of this honourable House concerns the reclaimed land located at PT 356, next to Lot 319 Section 11E in the North East District. This is reclaimed land that was developed in line with the construction of the third PTSP twin submarine pipeline, which was completed in 2020. After the land was completed, we indeed see that issues have arisen, where the climate change situation that came along has caused flash floods even without rain in the car park compound of Pangsapuri Pelangi. But I also thank the MBPP Engineering Department for taking swift action to install duck-bill outlets to reduce the impact of the flash floods. However, I still hope the responsible parties, such as the Penang Water Supply Corporation (PBA) and also the Chief Minister's Incorporated (CMI), can take immediate action to overcome this issue. But one issue that worries me is that after the land was recently completed, we can see ships anchored on the land, and I have obtained confirmation from the District and Land Office, which has also identified that no approval has been given by any company or any ship to anchor on the land. So I call for enforcement action to be taken, because I fear that the ships anchoring there do not know what activities they are carrying out, which may threaten or disturb the peace of residents in the local area… (interruption).
Thank you, Honourable Pengkalan Kota.
Last one. Last one, regarding Penang FC. Last one. Thank you, Dato' Deputy Speaker. Before I end my debate, indeed in this honourable House my colleagues such as those from Bagan Dalam have raised the issue of Penang FC. I take this opportunity to comment a little as a Board Member of Penang FC. I am together with my colleague, the Honourable Batu Uban. As… (interruption).
To answer on behalf of MMK Sukan?
As… as… as football fans, we understand that when the results are not good, all the fans, all the supporters, will point the finger at the management. That is usually normal, because I am a football fan and I also do the same. But when the team wins, no one thanks the management. Everyone will say it is the players who performed… (interruption).
Deputy Dato' Speaker, I ask for just one… (interruption)… wait, wait, one minute.
I apologise, later on this topic you all can discuss with the Penang FC Club… (interruption).
If it is once or twice, okay. It always loses until it sits at the bottom of the table, really cannot… (interruption).
If the team wins every time, we would have entered the World Cup long ago.
Honourable Bagan Dalam… (interruption).
Don't go into the Premier League already… (interruption).
Bagan Dalam should go in as a player...
Honourable Bagan Dalam, it is not that we lose every time, there are also wins. When we won against KL, it was two (2) times… (interruption). But in those two (2) wins, nobody thanked the management… (interruption). I understand. I understand, but that is just how it is… (interruption).
This is the House, not a football stadium.
We take this criticism and this reprimand seriously, we do not say that we do not take it seriously. We indeed view the fans' requests in this respect very seriously, and we have also taken drastic action, where committees, particularly together with the technical team, are formed to overcome issues such as player selection. We thank Dato' Deputy Speaker for kindly agreeing to help in terms of the committees, particularly the player selection committee and also the committee to look at player performance, physical fitness, marketing and sponsorship, and to set the relevant SOPs to ensure that Penang FC management can function well. We understand there is criticism, but do not forget that the Penang SUKMA squad, which is also part of Penang FC, recorded a very good result in the recent SUKMA football competition, where after
22 years, under the leadership of coach Akmal Rizal, we succeeded in bringing our football squad into the final match. The last time we entered the final was when SUKMA was held in Penang in the year 2000. And my colleague from Bagan Dalam also raised the issue of the SUKMA squad being absorbed into the first team, as was answered by the Honourable Bagan Jermal: two (2) players will enter the main squad, but 11 players will play for the reserve squad. In the new format, the reserve squad and the main squad can swap. That means if there are players whose performance is good, we can promote them to the main squad, and vice versa, if there are players whose performance is poor, we can ask them to play in the reserve league. That is the new format, and I hope this will bring new life… (interruption).
Thank you, Pengkalan Kota.
In conclusion… in conclusion…
Thankfully there is no delegation, otherwise we would already be in the Premier League… (interruption).
Okay, in conclusion, Honourable Dato' Deputy Speaker, I feel that the budget tabled this time indeed places the State of Penang on a good and stable path to achieve the Penang2030 Vision, to make the State of Penang a smart green state based on family, and indeed to be an inspiration to the Nation of Malaysia. The responsibility to realise the Penang2030 Vision does not rest solely on the shoulders of the State Government, but also on you, Honourable Members of this honourable House, regardless of whether you are on the government or opposition side. We must play our part so that the State of Penang can continue to be a dream state that brings hope to everyone regardless of race, religion, age, gender and socio-economic status. So with these words, I humbly move to support. Thank you.
Thank you, Pengkalan Kota. A reminder to all Honourable Members, the time given is only 20 minutes. Do not use football or the World Cup to add time. Please, a little. The Honourable Member is requested to continue.
Thank you, Deputy Speaker. Greetings of peace and hope to the Honourable Deputy Speaker Dato’, the Most Honourable Padang Kota, Tuan Chow Kon Yeow, Chief Minister of Penang, the Honourable Members of the State Executive Council, the Honourable Members of the State Legislative Assembly, Heads of Departments, and respected ladies and gentlemen. Thank you, Dato’ Deputy Speaker, for giving me the opportunity to take part in the debate on the Supply Enactment 2023 and the Development Estimates Motion for 2023 in this august House. Dato’ Deputy Speaker, first of all I would like to take this opportunity to extend my heartiest congratulations to the Pakatan Harapan Government for its success in defending the Dewan Rakyat seats in this state and, at the same time, for succeeding in recapturing the Dewan Rakyat seat of Nibong Tebal with a solid majority. I also wish to extend special congratulations to three (3) Members of this House, namely the Most Honourable Chief Minister, the Honourable Air Putih and the Honourable Seri Delima, on their success in defending the Dewan Rakyat seats of Batu Kawan, Bagan and Bukit Bendera. May there be more Members from this August House in the Dewan Rakyat. Important matters involving the State and the Federation will be raised more forcefully in the Dewan Rakyat in future. Dato’ Deputy Speaker, this success reflects the confidence of the people of the State of Penang in the prudent governance and the capable leadership of Pakatan Harapan in this state. Therefore, it is clear that this confidence has been translated into unwavering support for the Pakatan Harapan Government of the State of Penang at the ballot box last Saturday. Our ability to fulfil 90 per cent of the manifesto promises of 2018 has given assurance to the people that we will continue to put the people first, and it is also a yardstick of this government's sincerity in bringing about genuine change and reform. Accordingly, the essence of the 2023 budget presentation reflects this government's continuous efforts to bring prosperity and well-being to the people of the State of Penang. Thus, in my debate today, I will also touch on several matters involving state development, administrative management, housing, transportation, public safety and inclusiveness. Dato’ Deputy Speaker, the first matter I wish to raise concerns transportation. The problem of traffic congestion is a dilemma that has been faced for decades. Because this government is determined to address this difficulty effectively, as is well known to the public, the Penang Transport Master Plan, abbreviated in English as ‘PTMP’, has been conceived. PTMP is a comprehensive, efficient and integrated transport strategy that covers land and sea transport infrastructure. Under the component of Main Roads and Third Route (PMRT), which consists of three (3) toll-free main roads, namely: Package One – North Coast Twin Coastal Route (NCPR) from Tanjong Bungah to Teluk Bahang, Package Two – Air Itam Bypass – Tun Dr Lim Chong Eu Expressway and Package Three – Gurney Drive Bypass – Tun Dr Lim Chong Eu Expressway. I am pleased to inform this August House that Package Two – Air Itam Bypass to the Tun Dr Lim Chong Eu Expressway is beginning to be carried out after a long wait. Construction activities such as earthworks and road widening involving heavy machinery can be seen along the Thean Teik Expressway and Thean Teik Road. The road shoulders have also been closed. Road barriers have been placed to ensure the safety of road users while construction is being carried out. However, this has indirectly caused the existing road to become narrow and has resulted in traffic congestion during peak hours, (with permission)…rush hours. The Air Itam area and the surrounding Thean Teik Road are high-density residential areas, therefore it cannot be denied that road usage will increase, especially during busy periods.
I wish to emphasise that in our efforts to address one problem, it should not become the cause of another problem. We take note that Package Two – Air Itam Bypass – Tun Dr Lim Chong Eu Expressway is a long-term solution. Nevertheless, short-term solutions also need to be provided. In the meantime, I propose that traffic control during those periods be enhanced by deploying traffic police from the PDRM (Royal Malaysia Police) and traffic wardens from MBPP (Penang Island City Council) at junctions and focal areas, (with permission)…congestion hotspots. The second proposal as a short-term solution is to increase the use of public transport in the area, such as public buses. This measure will not only reduce the number of vehicles on the road during busy periods but also is in line with the PTMP's goal of achieving public transport usage of up to 40 per cent. Here I would like to draw our attention to one specific issue. At the end of 2017, the Management Corporation of Shineville Park and Shineville Garden, which is under the Air Itam State Assembly (KADUN), sent an application letter to Rapid Penang Sdn Bhd to apply for public transport services, public buses, from the residential area to George Town City through the Jalan Dato’ Keramat route, which is close to the Penang General Hospital. After a session of dialogue with residents, the matter was raised again and, on my advice in September this year, this matter was brought to the attention of Rapid's company, and I also sent a letter to Rapid to obtain the latest feedback regarding the application. However, until today, more than two (2) months after the date of the email and letter, Prasarana has still not given any response. I hope Rapid can provide the latest development on the application to me and the management corporation, and not give the excuse that the route lacks capacity for use and therefore is not operated, because it is Rapid's responsibility to provide a complete bus route service to the people of this state, whatever the means. Dato’ Deputy Speaker, the next matter, the second matter I wish to raise, concerns housing. The State Government, in an effort to ensure sustainable development that meets the needs of all levels of society and to provide shelter for residents, has policies such as the Affordable Home Provision Policy, the Home Ownership Campaign Policy, (with permission)…Home Ownership Campaign (HOC), the Policy for the Continuation of the Home Ownership Campaign Implementation, (with permission)…Home Ownership Campaign 2.0 (HOC 2.0 Plus), which took effect from 1 July 2022 to 31 December 2022. The Home Ownership Policy through hire purchase and rental housing are all managed by the Penang State Housing Board (LPNPP). These policies ensure that the prices sold, hire-purchased or merely rented are controlled at a reasonable level for all parties, in accordance with changes over time and market conditions based on each person's ability. However, I wish to emphasise in this August House that apart from providing housing opportunities to the people, we also need to ensure that the homes that are occupied are always comfortable and sustainable. The upgrading of infrastructure and public facilities, especially for rental housing and low-cost housing types, from time to time is extremely important. We must not only ensure a comfortable living environment but, more importantly, ensure that it is safe to guarantee a quality life for residents, (with permission)…‘Quality Life and Quality Living’. Therefore, we need to ensure that the agency responsible for housing upgrading under the State Government is implemented in a financially well-managed and transparent manner in procurement. We must curb the vices of leakage and
waste when these upgrading works are carried out so that State Government funds are not wasted. Matters such as ensuring that repair maintenance works are addressed quickly and that rectification is completed by suppliers and contractors within the time allocated are basic principles that must be complied with. Dato’ Deputy Speaker, Matter Three. What I wish to raise concerns public safety. Recently, a video recording of an incident in which livestock cattle charged into a restaurant and a market went viral on social media. There are also pictures that went viral on social media showing livestock cattle blocking the road and endangering road users. It is regrettably reported that both incidents occurred in the Air Itam area. This matter has been raised with the Local Authority repeatedly, yet such undesirable incidents continue to recur. In this matter, the Local Authority, together with the presence of the Enforcement Department and the Vector Control and Veterinary Department, should take firm action against irresponsible cattle breeders to the extent that they endanger the safety of the public. The Air Itam Market and the restaurants around the Air Itam Market are always filled with visitors, among whom are senior citizens, children and tourists. Therefore, we need to ensure that public places such as these are safe and that nuisance does not occur. According to the census conducted by the Veterinary Services Department to identify the number of livestock by district in the State of Penang, in 2019 there were a total of 19,667 cattle, comprising beef, dairy and feedlot types. Therefore, the phenomenon of cattle escaping is an issue that needs to be monitored not only in Air Itam but also generally throughout the State of Penang. I propose that the relevant Honourable Member of the State Executive Council hold an engagement session with the Local Authority and the State Veterinary Services Department to address this issue. The authority given to the Local Authority through the By-Laws and the powers given to the departments through regulations and acts are sufficient to take firm action against irresponsible cattle breeders who are negligent of the welfare of livestock animals and the safety of the public. Dato’ Deputy Speaker, the next matter concerns the recognition of the ‘Michelin Guide’ award for Penang. I would like to quote from my debate speech in the House session in May this year, when I proposed that the Executive Council Committee for Tourism and Creative Economy find a way to obtain recognition from the ‘Michelin Guide’. The following is an excerpt from my speech at that time: “Penang is known as a food tourism destination in this region, but compared with Singapore, which already had 38 food premises that received recognition in 2017, and several cities in Thailand such as Bangkok, Chiang Mai and Phuket, which had 32 food premises that received recognition in 2020, the Michelin Star award in Penang can stimulate our tourism industry.” I am proud and honoured that when a memorandum of understanding was signed together with the Greek National Tourism Organisation (GNTO), (with permission)…Greek National Tourism Organisation (GNTO), and the Michelin Guide in October recently, which received extensive media coverage. I want to draw the attention of the Executive Council Committee for Tourism and Creative Economy to the fact that the Air Itam area is a main focus for tourism, such as Penang Hill, which this year was recognised by UNESCO as the Penang Hill Biosphere Reserve recently. Kek Lok Si Temple, the World War II Memorial, the Air Itam Dam and the mural art around the Air Itam market. Within that area, there are renowned eateries that are the main destinations for tourists, such as Laksa Pasar Air Itam, Mee Kari Jambatan Air Itam, Mee Goreng Jalan Bukit Bendera, Nasi Kandar Kampung Melayu and many more. I hope the Executive Council Committee for Tourism and Creative Economy, together with the Greek National Tourism Organisation and the Michelin Guide, can consider Michelin star recognition for those who have run food outlets in Penang for generations, especially in Air Itam. The next matter, Matter Five, concerns the State Budget for next year, namely the Supply Enactment 2023 and the Development Estimates Motion 2023. Dato’ Deputy Speaker, this Budget, which carries the theme “Sustainable Development for the Well-being of the People”, reflects the continuity of this government's resolve and determination to continue uplifting the dignity and interests of the people of Penang. I take note that in 2022, a total of 39 small-scale flood mitigation projects were identified for implementation using allocations from the Ministry of Finance. In this regard, I would like to quote a report from ‘The Star’ dated 4 July this year, in which residents around Thean Teik Expressway requested that the State Government build additional monsoon drains to overcome flood disasters. The news report also stated that the construction works for Package Two – Air Itam Bypass – Tun Dr Lim Chong Eu Expressway were the cause of flash floods in the area. At the same time, news from MyMetro dated 18 November reported that the Malaysian Meteorological Department, the Southeastern Asia-Oceania Flash Flood Guidance System and the flood forecasting model of the Department of Irrigation and Drainage Malaysia stated that there is a risk of flash floods at several locations should heavy rain and thunderstorms continue. According to the report, Air Itam is among the areas listed as high-risk locations. Therefore, based on this feedback and the media reports, I request that Air Itam be allocated additional allocations from funds to address the flood problem. Dato’ Deputy Speaker, before I conclude my debate, I would like to take this opportunity to extend my thousand thanks to our Most Honourable Chief Minister for approving the application to build a roof for the Penang2030 Centre at the Desa Mawar field during the Love Penang Jelajah last September. This improvement will certainly benefit local residents, and the project will be managed by the Penang Island City Council as the implementing agency, and here I hope the construction can be completed early in 2023. Air Itam humbly hopes that the proposals that have been submitted can be put forward and refined for the sake of common well-being. Let us together shoulder this responsibility for the sake of the survival of the people and the prosperity of the State of Penang.
Hereby, Air Itam supports the Supply Bill and the Development Estimates Motion 2023. Thank you.
Thank you, Air Itam. Please, Berapit.
YB. Dato’ Speaker, I would like to take this opportunity to thank you for the opportunity to take part in the debate on the Supply Bill and the Development Estimates 2023, which was tabled by the Most Honourable Chief Minister on 21 November this year. Here, I also extend my thanks, thank you, I extend my congratulations and well done to the Y.A.B. Chief Minister, who has succeeded in tabling the Budget for the fifth time, bearing the theme “Sustainable Development for the Well-being of the People”. Dato’ Speaker, I would like to touch on the matter of the psychiatric ratio in Penang. The level of mental health among the community in this state needs to be given serious attention, considering that the number of suicide cases reported has increased in recent times. Which is associated with stress due to the COVID-19 pandemic, according to the answer to a written question that I obtained, there were 119 suicide cases in 2021, compared with previous years when the number did not exceed 80 cases a year. Meanwhile, this year up to September, there were 74 cases. However, I was shocked by the ratio of psychiatrists in this state. According to the answer I received at the Penang State Public Hospital, the ratio of psychiatrists is approximately one to 100,000, compared with the WHO recommendation of 1:10,000. The ratio of clinical psychologists to the population at the Penang State Public Hospital is 1:600,000. Compared with the WHO recommendation, which is 1:5,000. With such an imbalanced ratio, I am also worried about the work stress of our specialists in Penang. Are they under very high work stress? I also want to ask the EXCO for Health. When, at what time, did the EXCO know of the problem of the shortage of these specialists? Was this problem ever brought to the Federal level? And what, what is the response from the Minister of Health? Our society is facing very great life stress from the post-pandemic, ageing, domestic violence and commit suicide. Sorry?
Siapa PM?
Siapa PM?
That is also stressful.
That is a stress, I agree. They all really need help from psychologists or psychiatrists. But, with ratios many times below the WHO standard, how can we help the oppressed groups? Please imagine a patient with depression who does not get proper treatment at General Hospital because of a shortage of specialists. But the mental condition cannot cope with the pressure at work and he is forced to quit his job. A patient who also has a mental health problem has to see a doctor at a private clinic. But without a job, there is no money to pay. This will worsen and become a more serious situation. So, I also request, I think Penang, our state, must seriously look at cases like this. Do not let the ratio fall too far below the WHO so that we do not reach the international standard. I also ask that we give support to single mothers. The Penang State Government has taken a very good initiative to establish safe families and has launched first support point services at 53 locations, including the ADUN Service Centre. Efforts to overcome and assist victims of domestic violence so that they can get consultation more easily, more conveniently in this state. However, I myself have heard of a case involving a mother, a woman with three children who constantly faces domestic violence but does not dare to lodge a police report and does not want to be treated at the hospital even though she was persuaded by her friend and also her family members. When asked, the victim always answers that if a police report is made, her husband will be arrested, so this will cause her family to have no source of income because the mother has to look after the children at home and cannot work. So here, I ask the State Government to also be able to make a cooperation with associations or NGOs, such as orphanage NGOs of a private nature, so that they can set up child care centres, send the children to such centres, and let women, especially single mothers, go to work and earn an income to raise their children.
I understand that the Penang State Government has launched the "Penang Human Entrepreneur Monitoring Program" and also Wanita Jana Rezeki, but I think one mechanism that makes it easier for mothers to work without having to worry about their children is necessary, and in this we can make a cooperation together with all NGOs, not only the efforts of the Penang State Government. But this may require an injection of financial funds, and we can think about how to give incentives so that we can achieve a win-win situation.
Dato' Speaker. I would like to touch on disasters and climate change. Thank you to the Y.A.B. Chief Minister for holding a stakeholder engagement session together with all the Honourable Members, the Honourable ADUNs and all Members of Parliament, and also for accepting the proposal to set up a disaster humanitarian logistics centre or disaster depot. Climate change is something we cannot take lightly at the moment. Areas that were previously said to have no floods are now also often heard of; perhaps with only heavy rain there are floods, or sometimes there are landslides too, and the State Government's initiative to be able to set up this disaster depot to store essential goods for disaster management in Penang is very appropriate. I hope this depot can be set up in every district and provide training to the personnel who will participate in disaster relief. At present, every Volunteer Fire Brigade Association in Penang can be said to be a back-up team to the State Government. Most of them have sufficient experience and training, but we also have, we also have some volunteer associations or NGOs such as the Rondaan Teams that are ready
to help if a disaster occurs. So I hope training can be provided to them.
Sports facilities. I welcome the Honourable Chief Minister for increasing the allocation for upgrading public courts to RM3.5 million for next year, with the development of facilities such as roofs, fences and so on. In Bukit Mertajam there are (8) eight covered basketball courts, but in KADUN Berapit there is only (1) one. So, that one is the covered basketball court with the longest history in Bukit Mertajam. So I hope that with the project to add roofs, basic facilities, toilets and so on next year, KADUN Berapit can be considered first so that the needs of the local residents, especially our young people, can be met.
Dato' Speaker, water supply, with the water disruption issue this year in July, has become a major problem and almost all Penang residents were affected. We know that this problem, this which occurred, happened as a consequence of the phenomenon of the water source and flooding in Baling. This matter has affected residents around Penang, especially residents living in higher areas or multi-storey residential areas. Water was not distributed well to those places after the incident occurred. Therefore, I welcome the State Government's cooperation to cooperate with PBAPP to propose a policy to enforce an audit review of the inspection and maintenance of the pipe and tank reticulation systems in multi-storey residences throughout Penang. However, there are also non-high-rise residential areas facing water pressure problems. During the July incident, Taman Kuali in Berapit, a place with terraced houses that are not high-rise, also faced a problem of no water supply until the last few days when water supply was redirected, and almost every day I, together with the Volunteer Fire Brigade Association, went there to distribute water. Accordingly, I request that more pumps be considered for installation in this state so that higher places do not face problems with water pipes reaching the houses of those places that are further from the water treatment plant.
Dato' Speaker, I would like to record my highest congratulations to the State Government because, not long from now, we will indeed become the first Age-Friendly City in Malaysia. This initiative, namely "Aged Friendly City", the age-friendly city, Age-Friendly City, has proven that Penang always leads, and I saw the presentation on the Age-Friendly City when attending the RMK Social Development State Government Meeting recently. Not long from now, by 2040, our state will become the first state to face the phenomenon of ageing, which will become an older society, yes. Therefore, as a Government that has never failed to give attention to all parties, I feel we must also make this policy, namely the "Aged Friendly City", a success. With the implementation of the Age-Friendly City, it will not only benefit senior citizens, but OKU persons, children, mothers and many others will also share these benefits. As a mother with a two-year-old child, I greatly welcome this initiative by adopting universal design in planning to make the Age-Friendly City achieve the goal of sustainable development, making cities and human settlements inclusive, safe, resilient and sustainable. I also support the active ageing direction plan made by the State Government to ensure that senior citizens are not left behind. I hope that together we can further create programmes and employment opportunities for senior citizens so that their talents and experience can continue to benefit the present generation.
Dato' Speaker, as always mentioned by the Y.A.B. Chief Minister, the State Government always strives hard to ensure that Seberang Perai becomes the catalyst for Penang's future growth. I welcome the State Government's efforts towards the Green State. The State Government's proposal through the local authorities (PBT) to improve the infrastructure of stations for electric vehicle charging is good, but I feel it is pressing to ask why only MBPP is involved in the initial stage, and by identifying eight (8) suitable locations to place electric motorcycle charging stations. I understand that these electric motorcycle charging stations are free for all electric motorcycles in Penang, and here I hope that all Pilot Projects in this state, whether in terms of technology or culture, also cover the Seberang Perai area so that development is balanced, and we move together towards Penang2030. With this, I respectfully move to support.
Thank you, Honourable Member for Berapit. The floor is given to Pulau Betong.
Assalamualaikum Warahmatullahi Wabarakatuh. Salam sejahtera. Dato' Deputy Speaker of the House, Chief Minister, members of the State Executive Council, members of the State Legislative Assembly (DUN), heads of departments and members of the media. Alhamdulliah, now it is my turn, from Pulau Betong, to debate the Tabling of the Supply and Development Bill 2023. On this occasion I extend my warmest congratulations and well done to Y.A.B. the Chief Minister for tabling a comprehensive budget for sustainable development to secure the well-being of the people of Penang. The budget was drawn up in line with the Penang2030 Vision and places emphasis on 4 Main Pillars. The first, improving liveability. The second, raising economic standards. The third, empowering the people. The fourth, investment in the environment. A comprehensive budget like this requires active and proactive action to secure the well-being of all of Penang, whether in the towns or in rural areas, because to realise this sustainable development it must ensure that no one is left behind, "Leaving no one behind". The State Government needs to take action by implementing plans to ensure the gap between urban and rural areas is closed. I therefore recommend to the State Government that it provide budget and also planning within the scope of tourism development and the creative economy for the South West District as well. The South West must also be developed as a green town for agro-tourism, because the South West District, especially Balik Pulau, has many attractive places for tourists who want a natural and green atmosphere. Dato' Deputy Speaker, the State Government should open up and provide as many opportunities as possible, firstly for economic development, secondly for infrastructure development, thirdly for the development of human capital and mind, fourthly for the development of water supply, fifthly for the development of internet technology, and other rapid developments in the towns must also take place in rural centres. This year's budget has also been drawn up to address these aspects, but it has not been specifically allocated by district, especially Balik Pulau, so that it can be seen that this budget will be able to benefit all the people of Penang, and the people of Penang will receive these benefits.
We want economic growth that keeps getting better, to be enjoyed and felt by all the people in Penang. Members of the House, I also extend my thousands of thanks to the Penang State Government for remaining committed to upholding Islam as the Official Religion of the Federation and strengthening Islamic practices in the State of Penang. The provision of RM75.08 million to strengthen the development of Islam in Penang proves that the Islamic faith and the Muslim community in Penang continue to be strengthened and defended. Unlike what is being propagated now. For the construction of mosques, the State Government has also allocated financing of RM18 million. I hope that with this planning it will have a good impact on the welfare of the Muslim community in Penang and can put an end to the narrow political rumours and speculation about the fate of the Muslim community in Penang under the Pakatan Harapan government, where Islam is raised as something only for the Malays, whereas Islam is universal for all races, bringing the blessing of mercy to all the worlds. Members of the House, I would also like to welcome the efforts of the State Government in developing and strengthening the agricultural sector in this state by providing development budget that will be channelled to the State Agriculture Department, amounting to RM6.92 million. Through this allocation, the Farmer to Farmer programme and also the one-off payment of RM500 to paddy farmers can also be continued as an initiative for the state's paddy farmers, especially paddy farmers in the Balik Pulau area. The allocation in 2022 of RM160,000 was successfully channelled to entrepreneurs in my own State Assemblyman (ADUN) area in Pulau Betong. I take this opportunity to say many thanks to Penanti, which approved RM160,000 thousand for 30 entrepreneurs in the Pulau Betong area. Dato' Deputy Speaker, health services are a basic human need and essential for residents across all ages, health across all genders and races, and having good health is a priority for mankind. A healthy society is the catalyst for national development. The best health facilities are the compulsory responsibility of the Federal Government. This responsibility covers raising health status for the quality of life of a healthy and productive society through health services that are efficient, effective and comprehensive in promotive, preventive, curative and rehabilitative care, and covers overall health for communicable and non-communicable diseases. To achieve this, strategic management in the health system is needed, yet this health aspect has not been specifically described in this year's budget tabling. I recommend that the State Government also be able to provide a specific framework regarding this health budget, showing that the State Government cares about the health of the people, although the provision of health services is the responsibility of the Federal Government, the State Government also contributes to the health welfare of the people. Members of the House, the Safe Family policy towards a Penang free of violence has been in place since July 2020. Congratulations to Honourable Chong Eng, who took the initial step by establishing First Support Points at the State Assemblyman Service centres towards the Penang2030 Vision. The State Government has also provided allocation for workshops and training for 234 First Support Point officers through PWDC, and the State Government has provided a budget of RM2.5 million for Women's Development and Training. Seeing the increase in cases arising from family problems, financial difficulties and emotional stress, First Support Point officers cannot merely be given training, therefore, in line with the family policy all this time, the time has come for the Penang State Government to initiate the establishment of family health clinics activated in all districts so that they are effective, and hotlines are activated at all First Support Point centres to make it easier for the target groups to deal with, because most victims are ashamed to come face to face to seek assistance. Staff involved with First Support Point are given regular training to improve efficiency in helping victims. Family health clinics also provide mental health services in building psychological well-being, so an effective support system needs to be implemented urgently and effectively. Dato' Deputy Speaker, I extend my million thanks to all government officers who are so efficient and always ready to help us provide good service to the people. I sincerely hope that such performance will always be improved. As an appreciation to officers and also state civil servants, Y.A.B. the Chief Minister has approved a Special Financial Payment of one month's salary and also a minimum of RM1,200 involving 3,920 state civil servants, with a total allocation of RM6.13 million. Likewise, supervisors and also teachers of KAFA, Al-Quran and Fardhu Ain classes have not been left out in this year's budget, a total of RM300 per person will be disbursed, while Tahfiz Teachers, Pondok Teachers and TADIS Teachers, Islamic Kindergarten, will receive RM200 each. This special payment will be disbursed in December 2022. Thank you to the Penang State Government, for although it is slandered as a government that sidelines or threatens Islam, in fact this is what we hope for from a model State Government, one that upholds the Islamic faith by taking actions such as these. This is the catalyst for the Islamic faith to move forward in Penang, dakwah activities inviting people to the teachings of Islam, there is no obstruction in Penang. Thank you to the State Government for continuing this effort even though others slander it. As a member of the Islamic Religious Council, I completely deny that there is any other religion interfering in the affairs of Islam in Penang. Members of the House, in line with the Penang2030 Vision, which gives focus and emphasis to the development of family institutions and also includes green and smart aspects as the direction of state administration over the next 10 years, the tabling of the 2023 Budget gives the main focus to targeting Penang's development in a sustainable manner. Therefore, the issues that I have described in this debate are very worthy of consideration and given attention and priority in the present situation. The family institution must be given main focus in ensuring this state is prosperous and develops rapidly, without the issues of certain moral decline among the people that will affect the development of human capital among the people of this state. To make this state well-being and developed, make sure the formation of a happy and well-being family institution can be made prosperous in this state, and so that the people can drive sustainable development.
Dato' Deputy Speaker, "A kitten on top of a rock, A parakeet being harassed by a hawk, A plural society can unite, Sustainable welfare is beyond measure."
"Buy a jar of gulai, Gulai mixed with honey water, The people's wishes must be attended to, Hopefully society will be united in solidarity." I support, that is all. Assalamualaikum warahmatullahi wabarakatuh
Thank you, the Honourable Member for Pulau Betong. I invite the Honourable Member for Batu Uban to speak.
Thank you to Dato' Speaker for giving me the opportunity to debate the Supply Bill and Development Estimates Motion 2023 tabled by the Honourable Chief Minister. Dato' Speaker, I would like to congratulate the Honourable Chief Minister and also the Penang State Government for tabling a budget that is the best for the people of Penang, even though the country is facing inflation and also uncertain economic effects caused by the weakness of the ringgit. Although this is a deficit budget, I believe this budget was tabled taking into account sustainable development policies and also the well-being of the people, as is the theme of the budget this time. Mr Speaker, I would like to congratulate the State Government because we have been able to attract foreign direct investment (FDI) and also domestic investment to Penang. Now more and more multinational companies are interested in operating in the state of Penang, and this also opens up wide employment opportunities not only for the people of Penang but also for residents from outside Penang. More than 21,000 job opportunities or vacancies by industry in Penang. I have also been informed that many people from Sabah and also Kelantan, and these are two states whose many residents have migrated to Penang solely to seek employment opportunities. So with the increase in the workforce and population, especially in the island area, I hope the State Government will also give emphasis to issues such as traffic, especially in areas close to industry such as Bayan Baru, Jalan Tengah and also Sungai Dua. Mr Speaker, the traffic conditions in the areas I have mentioned have become very congested, especially during peak hours after work and also from the start of work, namely early in the morning. I would also like to request the State Government to obtain consultant advice or conduct a comprehensive study so that we can solve this traffic congestion problem. If possible, I ask that we also place traffic wardens or traffic police at these hotspots so that we can also solve the problem of long vehicle and traffic queues. There may also be a proposal for us to install smart traffic lights, smart traffic lights where the waiting time or the green and red light durations can be coordinated, especially at the roundabout in Bayan Baru. The Bayan Baru roundabout is, during peak hours, certainly the only area with very severe congestion. Therefore, I hope especially the local authorities (PBT) can conduct a comprehensive study on this issue. And one more thing is in my area at the Phor Thay National-Type Secondary School, Sungai Dua, especially after school dismissal, I see many parents coming to pick up their children or students, causing the two-way road to become one-way and also causing traffic to be too congested in that area. However, several times I have met with the school and also discussed with the Council, but until today there has been no solution. So I am here, in this Honourable House, hoping that we can find a method of solution. Perhaps we can hold discussions with the school, the police and also the PBT involved so that we can solve this traffic issue.
Dato' Speaker, I also often receive complaints from residents regarding problems with the cleaning contractors of the Penang Island City Council (MBPP). I feel this issue I have raised before in this Honourable House during the previous sitting, but recently I and also, I think, my fellow State Assemblymen are also facing this issue, where the MBPP contractors who were awarded the tenders have failed to carry out their tasks properly. Among their failures are not keeping to schedule, not meeting the required number of workers, and only doing work when this complaint is received. This usually happens when we as people's representatives or Councillors and also our officers make complaints, only then do the staff or contractors carry out cleaning and collection, and unfortunately there are also places where rubbish collection is not done for two to three days, especially in strata buildings and flats, so this causes many complaints that we receive, not only about rubbish collection but also about cleaning such as grass cutting in drains. For information, Batu Uban is also one of the hotspots for dengue outbreaks. Every week there is a dengue outbreak, and every week we also have to carry out gotong-royong activities, but what we find is that this problem is caused by cleaning issues, especially in the drain areas. I also request the Public Works Department (JKR), namely Jabatan Kerja Raya, to upgrade the drains that have burst or that were built long ago so that the water flow can run smoothly, because this is one of the problems, water segment (with permission), where water stagnates and also mosquitoes such as Aedes breed, and so on. Returning to the Penang Island City Council (MBPP), I feel that although MBPP says it takes action against contractors who fail to do work or carry out the tasks given to them, they impose LAD or fines, but I see these offences recurring. Perhaps the LAD imposed is too small or the action taken by MBPP is not strong enough. I hope that the supervisors and MBPP officers, I see, are not very strict at all. We have failed to take firm action. So I would like to propose to MBPP that these contractors must be removed immediately if they fail, and replaced with new contractors. Do not just give LADs, impose fines and so on, but every year they are the ones who obtain the contract or their contracts are renewed every time. Firm action must be taken, and contractors must also be required to submit daily work reports, and MBPP officers must also be diligent in going to the field and monitoring these contractors, because I have also received information that only the same contractors obtain tenders even though their records are not very good. These issues must be looked at again, especially by MBPP.
Dato' Speaker, I would like to take this opportunity to also thank the State Government, which every year allocates funds for religious schools, mubaligh schools, Chinese schools and also Tamil schools. Although we know that education responsibility falls under the jurisdiction of the Federal Government, the State Government still carries out its responsibility to ensure that the infrastructure of schools in Penang is in a safe and good condition for occupation. Here, Dato' Speaker, I would like to request assistance from the State Government to provide allocation to SJKT Subramaniya Barathee, Gelugor, under my area, for the purpose of them building a playing field for the use of about 250 students of that school. For information, Dato' Speaker, this school is the only Tamil school in my area out of 12 schools, and this school was established in 1952, and originally the students of this school only studied in a container, and after 2008, when the State Government of Penang, Pakatan Harapan took over, the State Government gave a piece of land to this Tamil school to build a new building. Now they have a new four-storey building, but they lack a playing field for sports and also recreation for the students of that school. Therefore, I, as the People's Representative for this area, request the goodwill of the State Government of Penang so that we can provide some allocation so that the work to build a field for sports activities for that school can be carried out immediately, because we are a state that places importance on youth and also sports development. I thank our EXCO for Youth and also Sports, because I see many sports infrastructure facilities have been upgraded and some new facilities have also been built. However, we also need to give consideration, especially to these Tamil schools, most of which do not have an area for them to do sports and so on, and for Subramaniya Barathee School, they have land that was given by the State Government, but the land is somewhat steep, so they need a large allocation of about RM150,000 to build or set up a playing field. I hope the State Government can look into this issue.
Dato' Speaker, I would also like to request the State Government to give serious emphasis to curbing street gangsterism, formerly known as mat rempit. Recently this issue has become very heated, as every weekend there is street gangster activity, and also an accident recently occurred on the Lim Chong Eu Expressway. This not only causes disturbance to residents but also the safety of other road users. Every Friday night and Saturday, several of these street gangsters gather from N Park Batu Uban and pass through the areas of Sungai Dua, Lip Sin, Jalan Bukit Gambier, Bukit Jambul, and then they go out to the Lim Chong Eu Expressway. They not only just do mat rempit riding and so on, but also cause noise disturbance to residents in the areas I mentioned just now. I have raised this issue several times in meetings with the DO, and I thank the Penang Police Chief, who has responded and also taken swift action by setting up roadblocks, and he has also held a dialogue session with me and the local community to find or seek a way forward for the street gangster issue. However, in that discussion session, several issues were raised by the Penang Police Chief, among them that he requested that we have a By-law to monitor motorcycle accessory shops, where these motorcycle accessory shops mostly sell accessory equipment that does not follow specs for these mat rempit groups. Therefore, I am here to request that the State Government, through the PBT, enact a By-law so that we can monitor the activities of motorcycle shops that sell motorcycle accessories that do not follow specs. In addition, I request that the hotspots I mentioned earlier, or these gathering areas, be given additional CCTV. We install CCTV so that the Royal Malaysia Police (PDRM) can take legal action against them, because what the police told us is that when they arrive at the location, they cannot make arrests, and also sometimes the CCTV that exists is far from the location, so they cannot identify the number plates. Therefore, for the hotspots I mentioned earlier, I request that if possible we install new CCTV so that we can monitor this activity. Dato' Speaker,
I also congratulate the launch of the slogan 'Keusahawanan Satu Budaya' (Entrepreneurship Is a Culture), where I believe the State Government often places emphasis on empowering entrepreneurs. I hope that more entrepreneurs in this State of Penang can be empowered by providing technical assistance, business opportunities, training and also micro-credit loans. Dato' Speaker, I would also like to propose to the State Government, through the State Government Committee (MMK) for Trade, Industry and Entrepreneurship Development, that we take over the festival site. This festival site is located in my area in KADUN Batu Uban, but sadly we have large infrastructure and a large car park, yet this place looks gloomy and is only used once a year for the organisation of the Pesta Pulau Pinang. I would like to propose that the MMK for Trade and Entrepreneurship take over this festival site so that we can also rebrand it so that the festival site can become a tourist attraction by placing local entrepreneurs to trade there, as we have in Chowrasta, and the organisation of the Pesta Pulau Pinang should also be organised by the MMK for Trade, Industry and Entrepreneurship Development so that we can focus on the development of local industry, local market. Currently the festival site is organised by the State Secretary (SUK). I propose that the MMK for Entrepreneurship take over so that in the following years the Pesta Pulau Pinang can be organised by the MMK for Entrepreneurship. I understand that now those who obtain the sites or lots to trade at this festival site are mostly from outside. Traders who come from Baling, Sik, Nilai, and from Johor are also there, but local traders have less access and opportunity to trade. Recently, there was an auntie who sold drinks in my area, and she told me she had applied many times to trade on a festival site lot, but she was not given the opportunity, and what was stated was that she had to enter a tender. In my view, it is a bit difficult for these small traders to enter a tender at all, as it is hard for them to fill in the procedural forms. I have no objection if outside traders come here, but we need to focus on local traders, because the name is Pesta Pulau Pinang, moreover if it is Pesta Pulau Pinang but the opportunity for the people of Penang does not exist. This needs to be done immediately, and I hope the MMK for Entrepreneurship will place emphasis on this issue. Perhaps in the coming years we can further promote our traders, our local traders and so on, to trade at the festival site, because I know this festival site for this one month is very good business, very, very good, because I was also surprised when told that the tender to get a drinks lot was as high as thirty thousand. To sell a food and drink stall lot is thirty thousand, and if it is a carpet, more than two hundred and fifty thousand. This is information I obtained from the SUK website. I feel these issues need to be reviewed again... (interruption)
Honourable Member for Batu Uban, you have one more minute.
Thank you. That was about the festival site, Dato' Speaker. Dato' Speaker, lastly I would like to raise the issue of flood mitigation, not in my area. I thank our EXCO, Tanjung Bungah, that at Minden Heights, when I raised this issue in this Honourable House, recently a project at Minden Heights was carried out, and we have been able to solve the flash flood problem in that area that had lasted for about 30 years, but with the widening of the drain. I thank the JPS Northeast and also the JKR Northeast, which conducted a comprehensive study so that we could solve the problem on Jalan Minden. This one I was asked by the new Member of Parliament for Bayan Baru, Saudara Sim, that is, the issue of flood mitigation in the Bayan Baru area. The State Government, through JPS, approved the construction of a pump house valued at RM20 million, but recently when heavy rain occurred, the pump house did not function and also caused severe flooding in several areas of Batu Maung. The Honourable Member for Batu Maung faced several major issues like this while we were campaigning and so on, and at that time it was really bad, we received complaints from all the residents. Although we explained to the residents that this project had been completed, the State Government had spent RM20 million, but the pump house did not function. So I would like to request the State Government to review the construction of this pump house, and if there is a design problem, I ask that action be taken firmly against the consultant for this construction, and they must also be held responsible for this issue, because this issue causes financial loss, and we must be transparent and also ensure that the projects implemented really meet the targets and also solve the problems in that area, not only in Batu Maung. We also face problems at Pantai Jerejak, where when it rains flash floods occur, and this is an issue that has dragged on for some time. I request that the State Government and JPS Southwest be able to resolve this issue by conducting a comprehensive study, not just building a pump house. Perhaps we also need to look at the condition of the drains and also the drainage system so that we can solve this issue. With this, I support the budget tabled by the Honourable Chief Minister. Thank you.
Thank you, Honourable Member for Batu Uban. The floor is given to Bayan Lepas. The microphone at the back there is off. Okay.
In the name of Allah, the Most Gracious, the Most Merciful. (Recitation of prayer). Thank you, Deputy Speaker, for giving me the opportunity to debate the Budget presentation by the Most Honourable Chief Minister. I extend my congratulations and well done to the State Government for tabling a budget that gives balanced attention to the various segments in order to drive the state towards the success of Penang 2030. Deputy Speaker, after GE15, voting patterns appear to be more influenced by unhealthy sentiments towards the state and the nation; no matter how good the government in place, it will be sunk by the issues that are played up. Therefore, the State Government must market its strategies and further strengthen national unity programmes, and most importantly, the dissemination of information must be expanded, not relying only on the Buletin Mutiara in hard copy, not relying only on the Buletin Mutiara on the official Facebook page, but it must be expanded to other social media such as TikTok, Instagram and Twitter. The explanation and clarification of any issue raised must be answered promptly, as it may disrupt the stability of the State of Penang, while we also showcase the good work we have carried out previously. Deputy Speaker, we are still wondering who the 10th Prime Minister of Malaysia will be? Previously, we encouraged, or we tried to give, as much space as possible to young voters aged 18, and Alhamdulillah, our country has achieved what we hoped for. How remarkable these young people are, that Parliament has been suspended for several days, and until now we still have not been able to resolve the administrative problems of the nation, which should have been resolved immediately. This is the space we gave to the 18-year-old voters; we must view positively the impact on the nation, and we can expand it further to our young people. How necessary is political education before voting, so that they are not influenced to vote for any political party, because what matters most is that the administration of the nation must be carried out well. I also congratulate the young people who have made their choice; perhaps for them it is right, and some may hold different views, but we must still respect the decisions they have made.
Dato' Speaker, I also welcome the State Government's attention to the great importance of the large allocation for Islamic affairs, amounting to RM75 juta, RM75.08 juta, and most proudly, the State Government has agreed to host the national-level Quran Recitation Competition (Majlis Tilawah Al-Quran) for the year 2023. Moreover, the State Government also contributed RM3.52 juta for the organisation of the event. Thank you for the State Government's commitment, and this is precisely what we should publicise as widely as possible through social media. We need not wait for the Buletin Mutiara to be published once a week, twice a week, and so on. We must play our proper role, as well as the Information Department at the Chief Minister's Office or the offices of the YBs and so on, so that we can convey what the State Government has done and will do, and we once again must not play up racial issues and must never sideline Islam in this State of Penang. I also greatly appreciate all the efforts of the State Government to ensure services for all levels of society, by establishing the MPKK and establishing the JPWK for Family and Women, and most recently establishing the Penang Youth Department, despite the increased costs to the State Government. I am also keenly interested in opening a Penang 2030 Panel Service Centre for the Bayan Lepas State Constituency, using the existing site and building, namely the old Chinese National Type School, which is now the office of the Chief Minister's Corporation. I also sincerely hope to obtain good cooperation from the Chief Minister's Corporation and the State Government so that we can get closer to the people. Given the high value of land for something good, I would like to propose that the site, which is located right in the town of Teluk Kumbar and is now neglected, abandoned, obsolete and so on, be developed, or that we build a new building, to create a Penang2030 Centre under the State Government. And if we want to save costs, we can combine it with the construction of a Penang Digital Library and a Penang Islamic Digital Library there, to nurture outstanding human capital that will not be swayed by propaganda that could break the unity of the residents of this State of Penang.
Next, the residents of the Bayan Lepas State Constituency urgently need a large and comfortable public hall. Therefore, once again, I urge the State Government to take over the Teluk Kumbar Community Hall, which was previously built by PERDA and is located on land owned by the State Government. At present, the hall is very dilapidated, neglected and no longer used. I also hope that the Chairman of PERDA, who is here with us in front, YB. Bertam, can hand over the building to the State Government, because the land belongs to the State Government, but the building was built by PERDA and cannot be used properly for the benefit of the people. We also hope that the State Government can build, if it cannot be repaired, or if it can be restored, we hope the State Government will build a new, large hall with a badminton court and which can host indoor sports activities as well as community activities. I sincerely hope this can be made a reality, because previously the hall was indeed
used for feasts, for playing badminton, and most importantly, when there are floods, that is where the People's Centre is, that is where the Wakil Rakyat is, that is where the District Office gathers to deliver services to the people, but now it is simply left abandoned, the roof has even blown away and so on. If PERDA is unable to help, please hand it over to the State Government. The District Office has already taken action, and until now there has been no response from PERDA, and as far as I recall, PERDA has only been represented at a meeting once. So I hope for the goodwill of PERDA, and the Chairman is also my friend. I hope to receive an appropriate response so that it can be utilised by the residents of Teluk Kumbar in particular and the residents of the State of Penang in general. Around the hall there is a large area of land, and I have now developed it together with YB. EXCO for Sports and the District Office to upgrade the football field to a better standard, and I hope that the field can be turned into a mini stadium that has various facilities, and that the football field, in its size, can be made to meet the FAM standards and can be used for league tournaments and so on. At the same time, I also see that there is still vacant space to build a futsal court to meet the sporting needs of young people, located at the end of the field, which is still empty. I extend my heartfelt thanks to the Most Honourable Chief Minister, who kindly visited the field during the Love Penang Jelajah Programme and saw the participation of young people in the programme. Dato' Deputy Speaker, my voice is hoarse from campaigning..(interruption).
Yellow card Bukit Tambun..yellow card..
Five minutes are up..I cannot say much, my voice is hoarse. Dato' Deputy Speaker, I also request one more sports activity centre to build a futsal and basketball court, located at Sungai Ara adjacent to Lavendar Apartment, which is currently gazetted as open space on lot 1103, mukim 10. The open space covers 5.08 ekar. I think it would be good if it were utilised rather than remaining merely open space, which sometimes becomes a jungle wilderness. So I request that the State Government, through the Office of YB. EXCO for Youth and Sports, cooperate with MBPP so that at least 1 ekar, or however much, can be taken so that we can build a futsal court and also various facilities, such as a basketball court for example. Deputy Dato' Speaker, Bayan Lepas once again still hopes for the construction of a public market in Teluk Kumbar to meet socio-economic needs, as well as to create stalls for traders so that the economy can be generated more vigorously. At present, it is seen that small traders are trading without control, because we ourselves have failed to provide premises for small traders. I also take this opportunity to call on MBPP to assist the traders at the Taman Sahabat morning market, who have been operating for a long time, so that they can be licensed and provided with a special site so that it is more orderly and does not cause discomfort, and there are residents in the morning. An improvement action must be taken for this morning market at Taman Sahabat to assist the existing traders and also to ensure comfort. It has been very long, more than 10 years, I think nearly 20 years, the same since the Taman Sahabat Flats, but it has been left like that. Deputy Speaker, I also hope that MBPP can propose a centralised site for food stall traders by providing temporary hawker sites for those who trade along the road crossing Kampung Masjid, namely Taman Perda road, given the very large number of stalls, it is fun Dato' Speaker to go there, it is very enjoyable.
There are many kinds of food available because of the large number of stalls, and the response from buyers is also big, because it is near residential areas. We can propose, if we really want to help, we can try to obtain the road shoulder to use as a temporary trading site and so on, so that they can trade in an orderly manner. Deputy Speaker, I also ask that the fate of the fishermen continue to be protected. When storms occur, with strong southerly winds and gusts, their boats and sampans are often damaged, and some even capsize, struck by the wind while they are mooring the boats and sampans. Therefore, I extend the request of the fishermen of Sungai Batu to extend the existing wave breakwater, to extend it, because the existing barrier is still insufficient to protect their boats from being struck by the wind until they capsize. When it capsizes, YB, it's confusing. To repair a boat, they come with letters to us, with application forms, complaints and so on, and the repair costs more than RM5,000.00. So we feel pity for them. Therefore, we ask the State Government, LKIM or JPS to work together so that the wave barrier can be extended as well. And at the same time, we see that the Teluk Kumbar Jetty is very dilapidated. Earlier at Sungai Batu, now at the Teluk Kumbar jetty. Very dilapidated. It needs to be repaired because its condition is dilapidated and unsafe. Many people fish from it, but there are no safety railings. If unlucky, one could fall and catch fish directly in the sea. So this jetty is really unsightly. I also request that the bridge connecting Teluk Bayu Beach with the government reserve land leading to the fishermen's unit, this is a shortcut to Teluk Bayu, which motorcycles can use, built by JPS, small. If possible, we want the bridge to be enlarged so that cars can cross it to reach Teluk Bayu Beach. I cannot answer visitors and netizens who want to go to Teluk Bayu. On weekends, nearly 1,000 people, more than 1,000 people, the road is full of potholes, very bad. Recently, thankfully, the State Government through BPEN gave RM80,000.00, so we can put sand. Land, PERDA land. PERDA again, it must be my friend again, but the area has already had plans…(interruption).
Bertam, respond a little.
There are plans to carry out a project there. Indeed we cannot put up a retaining wall. So I ask that this alternative road be built immediately, on the government reserve land from the garden road, straight to the end. So I ask…(interruption).
I just want to interject a little.
Boleh, boleh.
May I? I ask my friend, the Honourable Member for Bayan Lepas, to send me all complaints in the form of official letters, and I will ensure they are answered. Thank you.
Thank you. Continue. The Chairman of PERDA.
One more minute.
Eh! Still new, feels like I have only just picked up the mic. Then the problem, the big problem, earlier the bridge, roads and so on, those are the roles of the State Government and also the District Office and JPS, to help me. As for that road, PERDA will certainly not give it, because it sits in the middle, it crosses land that is being developed. So this matter is serious, I am already too tired to answer. What is it, the road is bad, the road is bad. Then there is a problem that is often faced by residents. I was just recently chased by a dog, a dog riding, the dog chased and wanted to bite. The dog problem. The dog problem is too much now. Especially at Kampung Bukit in Mutiara Perdana, and some have even gone into Saujana Height Flats. I call MBPP, MBPP comes, the dogs disappear. Then they come back, the dogs reappear. Two people have already been bitten, Deputy Speaker. So how do we deal with this problem? It is not just in one or two places, one can say the dog breeding is very large. At Kampung Teluk Kumbar and so on. Schoolchildren are worried. There have been many cases already. So could MBPP find a solution on how we can fight, how we can overcome the problem of stray dogs, which are unlicensed?
May I interject briefly? Okay, the Honourable Member for Bayan Lepas, I just want to update the Honourable Member for Bayan Lepas that our MBPP has a programme called TNR, which is Trap-Neuter-Release, to catch the dogs, to neuter them so that they cannot breed, and then release them back. After releasing them back, it is to ensure that because the dogs are territorial, other dogs cannot enter the area, but the presence of the dogs will eventually end within a generation. They will not breed anymore. That is to ensure that breeding is controlled throughout the MBPP area, within MBPP's controlled area. This is a programme that has been carried out between MBPP, Councillors, Connie and also IAPWA, with an NGO. Thank you.
Thank you for the information, but while waiting for the dog generation to end, people are being bitten. Another thing, we do not know what tags the dogs have. We do not have any, scanning barcodes, so when we scan people... So any immediate steps must be taken, especially those that threaten the safety of residents' children, there have been many cases, indeed. In Gertak Sanggul, even dogs crossing the road is a problem, people have been seriously injured, right. So we ask MBPP to think about it. Earlier, that idea was good, but if possible, catch those dogs and place them in one centre first to sterilise them all there, do not let them out again. Because we cannot tell whether they are wearing a cap or something. Then the problem we face is, as mentioned earlier, dogs, and now pigs. Even saying the word pig is difficult, wild boar. Wild boar is also a problem. Too many. It is not that the veterinarians do not cooperate, they do, but the capacity of the veterinarians is also not large, if I am not mistaken only three or four people. So, there are many complaints,
plants and crops being damaged, wild boars reaching the doorsteps of houses. Earlier I heard KOMTAR say the price of pork is RM100 per kilo. I do not know whether wild pork sells or not, if it sells, bring it to Teluk Kumbar. We are already confused…(interruption).
Dato' Speaker, that is a protected animal, a protected species. You cannot just shoot or kill wild boars, although we all know that in many places they sell wild boar meat, but it's a protected animal.
Okay, no problem. The problem is this cannot…(interruption).
Bayan Lepas, Bayan Lepas.
Ya.
They usually say it is RELA who shoots them all, but they also sell them, but they say they are selling timber. That's all.
No, there are too many, I, we are also confused. We do set traps, we do catch some, but, well, they are still more numerous than us now.
One more minute, Bayan Lepas.
Okay, another 10 minutes because others interrupted earlier. Okay, regarding natural disasters. Interject, interject. Floods, storms, heat, rain, humans often, we humans often blame nature, natural disasters, crises, what crises, climate crisis and so on, but we never learn the lesson. We are too, we feel we are egotistical, we feel we are good with our own greatness, everything is good with us, if it is not good, then nature is at fault. If it is good, then we are all right. So in my view, we need to keep pace with challenges. If nature changes, its threats change, so we too must change. Technically speaking, we approve town planning and so on. Previously a 2-foot drain was acceptable, but now it must be a requirement. It must be upgraded. These drains, these culvert drains, are 4 or 5 feet. That is the matter, that is the matter we mean to study thoroughly. The time has come for the existing technical guidelines to be constantly monitored by the government so that they are truly sustainable. Speaker has asked me to finish early, so I'll wrap up.
Good, thank you.
Okay, in my oral question, I raised the issue of floods in Bayan Lepas and Kampung Seronok, which are caused by the large volume of fast-flowing hill water, caused by development on Bukit Setia Triangle, and it will become even worse if the Bukit Belah development that we are currently carrying out also flows through to Kampung Seronok, and continues on to the Sungai Bayan Lepas. I believe many more developments will take place on that hill, now and in the future, but the river remains the same. So I urge the Town and Country Planning Department and the Penang Island City Council (MBPP) to look at this matter seriously and appropriately, so that there are alternatives to divert the water so that not all of it is concentrated in Sungai Bayan Lepas and Kuala Binjai alone, because the river cannot be enlarged any further except by taking land acquisition, which of course involves high costs. Just a little more, I want to finish, it feels like only 5 minutes. Dato' Speaker, I extend my millions of thanks for the response to my request that the State Government help resolve the traffic congestion problem at Bukit Belah and Sungai Batu by approving, if I am not mistaken, almost RM500,000.00 for consultation and survey work. Although we cannot solve everything, it means a great deal. There is action from us. Hopefully it will ease the problem a little, easing the road users who are often stranded going to and returning from work. We will continue to press the Federal Government to carry out the widening of that road, and we will also press for the reinstatement of approval for the construction of a Type 2 health clinic in Bayan Lepas, which we really need because of the population density, which urgently needs modern and complete health facilities. The last point in my speech, when touching on water, water audits and so on. In the previous session, I spoke up asking the government to also take part and help resolve the problem of these leaking tanks. Low cost. I, if I am not mistaken, have already repaired five or six tanks, a lot of money, all spent. So if the State Government can, the Penang Water Supply Corporation (PBA) itself can help low-cost houses to repair these tanks, I think we can save water in this State of Penang. And again, PERDA, low-cost houses in PERDA have the most leaking tanks. So I urge that there be action from PERDA, there are already 7 blocks there, please. If they want to hand over, want to set up a JMB (Joint Management Body) in PERDA, please resolve the tank problem first, please settle the debt with PBA, if I am not mistaken more than RM1 million, then I will encourage the residents there to take on the responsibility of setting up a JMB. Finally, I extend my millions of thanks to the State Government of Penang, which has always stood by me in serving the residents of the Bayan Lepas State Assembly seat (DUN). So I, hereby, fully support the Budget that was tabled by the Honourable Chief Minister of Penang so that our state continues to be peaceful, harmonious and blessed by God. Wallahualam, thank you.
Thank you, Bayan Lepas. Please, there are two more left, namely Bagan Dalam and Seri Delima. Not ready? Not ready. Honourable Members, since no one is debating, we will adjourn the House until tomorrow morning at 9.30.
The House was adjourned at 4.00 p.m.