Pulau Pinang · 27 November 2023
15th Assembly, 1st session, 2nd meeting · 258 turns · 42,660 words · official PDF ↗
ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.
Absent: Lim Guan Eng (Air Putih), Gooi Hsiao-Leung (Bukit Tengah)
(Opening)
Honourable Members. Recitation of prayer.
“Bacaan Doa”
Soalan lisan.
Honourable Members, I would like to invite Honourable Permatang Pasir.
Thank you, Dato' Speaker. My question is number 38.
38. Has the access route between the Green View condominium in Seberang Jaya and Taman Wakaf Setee Aishah been gazetted?
(a) Has this access route received the approval of residents? (b) Has the Majlis Agama Islam Pulau Pinang (MAINPP) permitted waqf land to be used as an access route for this project?
Thank you, Dato' Speaker, and thank you to the Honourable Member for Permatang Pasir for question number 38 concerning the access route between the Greenview Condominium in Seberang Jaya and Taman Wakaf Seetee Aisah. Has it been gazetted? Has this access route received the approval of residents, and has the Penang Islamic Religious Council (MAINPP) permitted waqf land to be used as an access route for the project? This matter occurred around 2014, about 10 years ago, so based on the records of the Penang State Islamic Religious Council (MAINPP), the access route from Greenview Condominium, Seberang Jaya to Taman Wakaf Seetee Aisah is waqf land and has not been gazetted or handed over, in line with the decision of the Penang State Fatwa Committee meeting number 5 of 2013. However, there were objections from residents, and their objections were submitted to the Penang Appeals Board, but these were subsequently struck out because the appellant failed to attend the case mention on 12 January 2017. On 20 January 2014, the Penang Islamic Religious Council (MAINPP) issued a letter to the Public Works Department (JKR) regarding approval for the road to be used by the public for the purpose of registering the road in the Malaysian Road Record Information System, MARRIS, in order to obtain annual maintenance allocations from the Federal Government to the JKR. However, to ensure there was no disruption to residents of Taman Wakaf Seetee Aisah during construction work, the Islamic Religious Council signed to permit the developer to use lot 200 in front for the purpose of a temporary route during construction. There is a letter dated 3 June 2014 from the Penang State Islamic Religious Council (MAINPP) itself, dated 3 June 2014, addressed to the President of the Seberang Perai Municipal Council (MPSP) concerning the development of 76 units of two-storey terrace houses and 9 units of shops on lot 144. So, regarding this letter, it is stated that the land at lot 144 Taman Wakaf Seetee Aisah is waqf land and, as per the decision of the Penang State Fatwa Committee meeting number 5 of 2013, this land is not permitted to be transferred to any party. Nevertheless, according to the Islamic Religious Council letter dated 20 January 2014 addressed to the Public Works Department and copied to the MPSP at that time, the MAINPP had already given permission for the Taman Wakaf Seetee Aisah road to be used by the public for registration under MARRIS. So, there is another complaint from residents now, and therefore on 19 November I, together with the Secretary of the Religious Council, went to inspect the road together with residents' representatives. So, the MAINPP will hold discussions with the local government, MBSP, to find a more harmonious solution between the developer and residents. So, because there is a letter from the council and the Fatwa Committee's own decision that it may not be transferred, but this letter was handed to the JKR for maintenance purposes and registered under MARRIS. So, for public access, based on that basis, the road can be used by the public. So, I think with the answer I have given, this is an issue related not to law, not to fatwa, but to residents' harmony. That means the condominium has already been built and is using the access road registered under MARRIS.
Terima kasih.
Soalan tambahan.
Sila.
So what is happening now is that when waqf land is given as access to a condominium, and the condominium is not a right and not related to the council, the disputes that have arisen are: first, when the road is used, it is waqf land; second, there will be a flood of traffic because of the double use by residents of Taman Wakaf Seetee Aisah. Third, there may be an influx of cars because condominiums like this usually do not have enough parking. So my question is: will the Religious Council resolve the dispute that has occurred between the residents and Wakaf Seetee Aisah?
That is what I answered earlier. Number one, although it is waqf land, it is related to the decision of the Fatwa Committee; it cannot simply be transferred, but the route can be opened for public access. Based on the decision of the Fatwa Committee, approval was given by the President of the Islamic Religious Council himself at that time, over there, Dato' Salleh Man, in 2014, and this letter was issued to MARRIS to be registered as a public access road for the purpose of maintaining the road, so if there is any damage, it is under the responsibility of the JKR. So, for that reason, this letter is used as planning permission for the construction of the adjacent condominium named Greenview, Greenview condominium. That is why I mention here that, on that basis, the Islamic Religious Council will hold discussions again in a harmonious manner between the residents and also with the developer, together with the local government, the City Council, to find a more harmonious way to resolve this problem, and there is a temporary permitted route in front on lot 200 just now, which is also MAINPP land, and I have been informed that this land is not waqf land but baitulmal land; I have been informed so. So perhaps we can hold discussions to find what was mentioned by the Honourable Permatang Pasir, a win-win between the developer and the residents there.
Thank you. I would like to invite Air Putih. Please.
Thank you, Dato' Speaker. My question is question 39. 39. State the list of lands of the 'Penang Development Corporation' (PDC) that have been granted to private parties for redevelopment as industrial land to attract investment. (a) Will the PDC continue to play its main role of opening up and developing industrial land, whether on its own or through joint venture?
Thank you.
Y.A.B. Chief Minister: Thank you, Dato' Speaker, for answering the question from the Honourable Air Putih. Up to now, the Penang Development Corporation (PDC) has never granted land to private parties to be developed as industrial estates. This is because the PDC's industrial land bank is located in strategic locations and can be marketed to investors in the promoted industries category. However, the PDC is currently facing constraints in developing a new industrial area known as Batu Kawan Industrial Park 2 (PKIP 2) due to location factors and an unconducive environment. Therefore, the PDC intends to collaborate with private companies to develop part of PKIP 2 in order to reduce risks and costs for the PDC. The PDC has successfully developed nine industrial estates in Penang to ensure that a sustainable industrial sector ecosystem can be achieved. To realise this goal, the PDC will continue to play its role as the main developer of industrial areas in Penang, although there are currently several private developers also involved in this field. With more than 50 years of experience and expertise, the PDC is confident that the industrial areas it develops will continue to be the focus of foreign and local investors. The PDC will develop strategic areas on its own without private involvement. Proposals for collaboration with the private sector are only for less strategic areas with high risk and uncompetitive costs. Thank you.
Terima kasih.
Thank you, Dato' Speaker. I thank the Most Honourable Member for the answer that the PDC will continue its main role of developing industrial land. Can the Most Honourable Member state the amount of industrial land still available to attract not only foreign investors but also local investors, because this has become an issue for many investors due to the lack of available land, and at the same time, regarding the proposal for the PDC for the first time not to develop industrial land itself but to be ready to cooperate with private companies, does this cover joint venture or direct sale, because if it is a joint venture it may be able to avoid violating the Land Acquisition Act, whereas if it is a direct sale it may become an issue whether it violates the Land Acquisition Act. And finally, Dato' Speaker, regarding the sale of land to UMECH Construction that has already been cancelled, was approval given by the PDC Board of Directors to UMECH Construction or UMECH Land on 28 November 2022 and 9 February 2023. Thank you.
Thank you.
Y.A.B. Chief Minister: Thank you, Honourable Air Putih, for the supplementary question. For the information of this august House, the other day I did give an answer that at this time the PDC is focusing its attention on the Bandar Cassia Technology Park and East Batu Kawan, which can be named PKIP 3 after one, two and three, but in the East Batu Kawan part, which provides approximately 800 acres to be developed as an industrial estate, it will be done in phases, because for Bandar Cassia Technology Park, construction can definitely begin this year, until 2025, because earthwork and basic infrastructure works have already begun and have already been offered to the first investor. As for East Batu Kawan, it is at the earthwork stage which began in mid-this-year. And it will take some time, and the land concerned may be offered after perhaps 2025, when land reclamation and basic facilities can be prepared. As we have answered, the PDC's policy is to ensure that every year, we have at least 200 acres to offer. And in addition, works to prepare the lands identified and acquired will be carried out in phases. The second question, regarding the Land Acquisition Act, that is why in the UMECH case, from the first day until now, we have used the term collaboration. And we do not use the term sale, because on the issue raised, where land acquisition is for the PDC to develop industrial estates. But through the concept of collaboration, the PDC still has a role in the lands concerned, yes, so that it does not violate the Act concerned. Regarding the third part, indeed the Board in February this year, what was offered was to UMECH Land. Actually, in the meeting in November already, when UMECH was invited to present their proposal in more detail to some of the Board Members who were selected to receive the briefing, at that time, it was already informed that the next negotiation would use the UMECH Land identity. And this was also based on a letter from UMECH Construction to the PDC in August, stating that they wished to continue negotiations using UMECH Land, one entity under the UMECH group which in fact has the same directors and shareholding. So, that is the decision made by the Board. Perhaps in the minutes, the PDC's minute headings did not replace the heading from UMECH Construction to UMECH Land. But in the offer letter, it was indeed signed with UMECH Land, and the entry of Sunway into the company, that too was the company UMECH Land and not UMECH Construction.
Thank you. I would like to invite the Honourable Air Itam. Please.
Thank you, Dato' Speaker. My question is question number 40. 40. By the year 2040, Penang will have the largest rate of senior citizens in Malaysia, where around 26.2% of the population will be aged 60 years or above. Provide information on the preparations that have been made by the Penang State Government and list in detail the related policies and plans.
Dato' Speaker, thank you for the question from Air Itam. So, the Penang State Government, through the Penang Island City Council (MBPP), is striving to make Penang an age-friendly city that is comprehensive in terms of the services and facilities provided. MBPP was accepted as a member of the Global Network of Age Friendly Cities and Community by the World Health Organization (WHO) on 28 July 2023. This initiative is a collaboration between MBPP, the Penang Women's Development Corporation (PWDC) and the Penang State Government. Among the efforts that have been taken by the State Government to establish an Age-Friendly City for senior citizens are the following: A-Two engagement sessions involving 70 government officers and non-governmental bodies were held in January this year, to identify Penang's achievements as an Age-Friendly City. B-A survey involving 1,500 and 1 respondents in the Southwest and Northeast districts was carried out from February to June 2023. C-Implementers of the Penang Island Age-Friendly City initiative were invited to share experiences in the Age Friendly Environment Echo Programme, which is a mentor-mentee programme by WHO and the International Federation on Ageing (IFA) in November 2023. And D-A Strategic Action Plan engagement meeting will be held in December this year to discuss and draft the action plan for the Age-Friendly City Action Plan, namely for Penang Island. So, next year, the Penang Island Age-Friendly City Action Plan will be finalised. This plan is based on eight domains established by WHO in drafting programmes involving Age Friendly Cities in order to create an environment that encourages active and healthy ageing. The implementation of this action plan is together with MBPP. The period of this action plan is from 2024 until 2025, which focuses on four domains as follows: A-Providing a variety of suitable housing options for senior citizens, yes, in the housing system. B-Making senior citizens an important and valued group in the community, namely mutual respect and social inclusion. C-Providing diverse access and services to senior citizens in communication and information. And D-Facilitating access to health and support for senior citizens, namely community support and health services. So, in addition to this, an active ageing roadmap has been established to provide access and opportunities to every group, especially senior citizens, to continue living an active life throughout the ageing process. This roadmap is divided into three phases: A-Awareness phase, B-Integration phase and C-Sustainability phase. So, in realising this roadmap, the Penang State Government together with PWDC, the Women and Family Development Committee (JPWK) and NGOs are carrying out programmes, advo, advocacy and activities to increase the participation of senior citizens in everyday lifestyles. The Department of Social Welfare (JKM) also plays an important role in safeguarding the well-being of senior citizens. JKM, through the services of the Senior Citizens Division, helps non-governmental organisations to establish activity centres that can bring senior citizens together with younger groups from various races and backgrounds, and to carry out suitable activities there. So, the Senior Citizens' Activity Centre (PAWE) is a place for senior citizens to carry out daily activities in the community. It is a social outreach service, namely reaching out and development for senior citizens, involving strategic cooperation between the Ministry of Women, Family and Community Development with other government agencies and non-governmental organisations. Apart from this, at the federal level, the National Advisory and Consultative Council for Senior Citizens has been established as a mechanism for implementing policies related to senior citizens and population ageing. The Senior Citizens Division of the Department of Social Welfare is the secretariat of this council, which is chaired by the Minister of Women, Family and Community Development. The roles of this council are as follows: A-Supervising the implementation of national senior citizens' policies and action plans. B-Developing programmes and strategies to educate the public to raise awareness about senior citizens. C-Making recommendations to the government on the care, protection, development and well-being of senior citizens. D-Recommending to the government changes to existing laws and also proposing new laws to guarantee the well-being of senior citizens. And E-Advising the government on senior citizens' issues, including international developments, collecting data and information, and encouraging research on senior citizens. Thank you.
Terima kasih.
Supplementary question. Thank you, the Honourable Member for Sungai Pinang. There are 2 supplementary questions. For the implementation of the Age-Friendly City policy and the Active Ageing Roadmap Plan, please state the total financial allocation that has been provided for the above purposes and also the method of allocating funds for the active ageing policy. Can the State Assemblyman's Office (Pejabat KADUN) ensure that this policy or the activities will bear the cost of implementing the Age-Friendly Policy? My second question: in the written reply, it was mentioned that NGOs would be involved in implementing the policy together. Please explain the method and conditions of the State Government in selecting the NGOs involved. Thank you.
Sila.
Yes, thank you to Air Itam for this supplementary question. Regarding the Age-Friendly City Policy and the Active Ageing Roadmap Plan. I wish to inform that so far the State Government does not yet have a specific policy for the Age-Friendly City and Active Ageing. Penang is taking a more pragmatic approach by using the age-friendly city framework, that is, this framework, which is clearer and more holistic, will be used to draft a strategic action plan. Furthermore, when we are in the WHO network community, we will learn best practices, or (with permission) the best practices, from this region and around the world. So for the Age-Friendly City initiative, a total of RM400 thousand.
Yang Berhormat.
Telah diperuntukkan.
Cost and mechanism.
Ya.
Working together with NGOs. Two.
That is the second question.
Dua.
I will answer the first one.
Sila.
And an allocation of RM400 thousand has been provided for consultation with the Malaysia Healthy Ageing Society (MHAS). So this amount will be disbursed in stages over a period of three years according to the achievements agreed with PWDC. So, through engagement sessions with stakeholders, including federal, state and local government agencies, together with NGOs and the private sector. In December this year, we will identify the priority action plan or programmes or projects to be carried out, as well as the budget required. What is certain is that the success of implementing this Age-Friendly City initiative requires cooperation and the involvement of the Honourable Members of this August House, as well as grassroots leaders such as KRT, MPKK and JPWK. So, for the second question. The second question is about the involvement of NGOs. What is the process of selection. So, there is no specific method of selection because we welcome any NGO that is interested in becoming part of this initiative, especially those that provide services to senior citizens. So, through the involvement of NGOs as strategic partners, the State Government will be able to better understand the needs of the senior citizens. Thank you.
Pulau Betong. Please, Pulau Betong.
Question 41. 41. What is the status of the construction of the foreign worker hostel at Teluk Kumbar? (a) How many foreign workers will be housed there? (b) Does the government intend to change the construction location to another place?
Ya.
Thank you, Dato' Yang di-Pertua. Thank you, Pulau Betong, for raising a good question for me to answer. The State Government, through the Penang State Planning Committee, has approved two applications for the construction of workers' hostels in the Teluk Kumbar area. As follows, an application to erect one 27-storey workers' hostel block comprising six shop units on the first floor, facilities on the first, second and 26 floors, and workers' hostel accommodation involving 512 units on Lot 1859, 1860, 1865, Tingkat Teluk Kumbar, Mukim 9, Teluk Kumbar by Tetuan Chong Company Sdn Bhd. An application for rezoning from General Residential Zone, Coastal Reserve Zone and Existing Road Zone to General Commercial Zone, and for an increase in building height from a maximum of 5 storeys to 30 storeys for development on Lot 1435, 1437, Mukim 9, Teluk Kumbar by Tetuan Zantalite Enterprise (M) Sdn. Bhd. However, until now the Penang Island City Council (MBPP) has only received a Planning Permission Application (PKM) from Tetuan Chong Company, on 27 June 2023, and the application is still under consideration. To answer the supplementary question from Pulau Betong, namely question number a, which is how many foreign workers are stipulated there. For the information of Pulau Betong, based on the approval endorsed by the Penang State Planning Committee, an estimated 32,680 foreign or local workers will be placed in the Teluk Kumbar area, and until now the location of Lot 1859, 1860, 1865 Tingkat Teluk Kumbar, Mukim 9, Teluk Kumbar, submitted by Tetuan Chong Company Sdn Bhd for the workers' hostel project, remains the same in accordance with the decision of the Certification of the Penang State Planning Committee on 25 June 2022. Any proposal to relocate the site must be referred to the State Authority for reconsideration, and also for the information of Pulau Betong, if a development is to be moved to a new location, it is subject to the landowner or subject to the developer. Thank you.
Tambahan.
Sila.
Soalan tambahan.
Pulau Betong first.
So I want to get an idea of the foreign worker ratio in Teluk Kumbar by country, for example how many from Indonesia, how many from Bangladesh, and also the views of the Honourable Member on the matter, since the think-tank body, namely the Penang Malay Think Tank Association, has requested that the State Government relocate the construction of the foreign workers' hostel from Teluk Kumbar to the Batu Kawan industrial zone.
As for my answer to Pulau Betong, if you want data by country, for the time being I cannot provide it. But for Pulau Betong, during the winding-up speech last week I indeed raised this issue, which is quite important: in Penang, as of 31 October 2023, a total of 147,344 foreign workers registered under Immigration who obtained a Temporary Work Visit Pass (PLKS), of which 69,859 are foreign workers who obtained the Certificate of Accommodation for Workers (COA) issued by the Labour Department (JTK). And for the information of Pulau Betong, 30,956 have not yet received a COA, have not yet received the Certificate of Accommodation for Workers, of which these 30,950 are indeed living in residential areas or in areas that did not receive an application, did not receive a certification from the Local Authority, for their employers to apply for a COA from JTK. For the information of Pulau Betong, we must remember that 46,529 foreign workers have not yet submitted a COA application, of which 46,000 we are not sure where they are located, therefore there are many objections and many complaints sent to the PBT, because these housing estates are occupied by foreign workers, and this will become a nuisance issue. Therefore, the State Government supports the construction of hostels for workers, whether for foreign workers or for local workers, and we must remember, as I have said, if we want to relocate a construction or a project, not to mention a foreign workers' hostel or a workers' hostel, if we want to relocate a project to another place we must go by the landowner and the developer. If the developer has land elsewhere, then they can make an application. If you want to move to Batu Kawan, we must remember that in Bayan Lepas there is an industrial area; workers do not necessarily have to live in Batu Kawan to work.
Bayan Lepas, every day they have to take the bus and come to Bayan Lepas, correct, Pulau Betong? Thank you.
Mr Speaker, I seek to interject.
Sila.
Thank you, Mr Speaker, and EXCO Jawi. My question concerns five (5) bungalows at Taman Kuala Sungai Pinang that have been occupied by these foreign workers, whether they have a COA and PLKS, as well as the bungalow itself, which we previously understood did not obtain an OC. And secondly, at Taman Green Ville Air Puteh, as well as foreign workers occupying two (2) bungalows behind Taman Green Ville Air Puteh, Balik Pulau, not Air Putih Tanjung, so Air Puteh.
T.E.H.?
So we want to know whether the PBT is aware of their situation or has taken note of their status, as they usually enter the villages and so on to catch fish and so on, so we are rather worried, as this causes problems for the local residents. Thank you.
Terima kasih.
To answer the supplementary question from Teluk Bahang, I indeed thank Teluk Bahang, as Teluk Bahang itself is also worried about the situation of foreign workers living in various places, correct, the Honourable Member for Teluk Bahang. Therefore, in the State of Penang we have established a guideline, namely the TLQ (Temporary Labour Quarter), and this TLQ guideline we are currently carrying out relocations, and this TLQ guideline, for all residential areas, we indeed do not allow, okay. And for the information of Teluk Bahang, as for the five (5) bungalows occupied by foreign workers, we indeed do not allow them, because for these foreign workers, whether they obtain a PLKS or not is up to the Immigration Enforcement. Immigration has the right to arrest and make arrests if they are foreign workers who do not have or do have a PLKS, so enforcement is subject to Immigration. To answer Teluk Bahang, regarding the status of foreign workers in strata title areas, okay, apartments or multi-storey buildings under common area strata title, where in the TLQ GP there are indeed several conditions, we will, I will hold a press conference this week, because the latest GP we are currently studying, where we understand that in areas such as strata title, if it is completely abandoned... (with permission), which we say is derelict, okay, strata title buildings that are indeed derelict, for example in my constituency, Jawi, Taman Sinar Indah, there was one building that was indeed derelict before, but with the presence of workers rented by employers to provide accommodation for foreign workers, that area, with well management... (with permission), by providing all basic facilities and also keeping the area clean, then we will see whether for foreign workers, for local workers who wish to occupy the strata title area, they must obtain a statutory declaration or a letter of permission from the management community, namely the management corporation for that area, and only then can we refer to the Local Authority to issue a letter of support for the employers or agents of the foreign workers to apply for a COA from JTK. This is only for the Temporary Labour Quarter, namely we will give three (3) years, and after three (3) years we will not consider any applications. Thank you.
Honourable Member, Mr Speaker, I want to... (interruption).
Next question, Penanti.
Mr Speaker, this is not the question, this includes a suggestion too.
Cannot be a suggestion, questions only.
Okay, it's alright, it's alright, questions only, regarding the Honourable Member for Teluk Kumbar just now, because we know the entry...
Penanti, Penanti constituency, next question.
Oh, not this one, but just a moment, because in Teluk Kumbar we have 15,000 residents; if 32,680 foreigners are added, all kinds of problems will arise.
Penanti, next question, also a Penanti question.
Oh, Penanti constituency too. So my question is number 42, Mr Speaker, but if he wants to answer, it may be fine, Mr Speaker, that is what he wants to answer. 42. What are the basis and guidelines regarding the prohibition on teaching/preaching for more than 16 preachers in Penang, including Ustaz Kazim Elias, following instructions from the relevant party, and the decision to no longer teach in Penang?
Not allowed. Please.
Good, thank you to the Honourable Member, Mr Speaker, and Penanti for question 42, question 46 and question 75. With the permission of Mr Speaker, I will combine them together, as they still revolve around the matter of the teaching licence (tauliah), and I have already answered in the winding-up for 46. What are the criteria for granting a temporary licence to invited preachers at mosques or surau in Penang? (a) List the names of controversial preachers who have been barred from delivering lectures at mosques throughout Penang. (b) List the preachers who applied for a licence from 2018 to 2022 but have not been approved until now. 75. State the SOP for applying to obtain a licence to deliver lectures at mosques and surau in the State of Penang. (a) List the number who succeeded in obtaining a licence and the number who applied from 2018 to 2022 by each district.
Just the summary is enough.
Good, question 42 also concerns the basis and guidelines, which I have answered in my winding-up speech in relation to this, which is Rule 13. It has seven (7) matters, so I have answered based on the Enactment Rule 13. Question 46 from the Honourable Member for Sungai Bakap, the criteria for granting a licence, has also been answered, and question b, list the preachers who applied for a licence since 2018, if we are to list the preachers, then from 2018 until 2022, the list of the total number of preachers who succeeded in obtaining a licence to teach Islamic religion in the State of Penang from 2018 until 2022, which I informed in my winding-up speech, totalled 1,793, but for the period 2018 until 2022 it was 753 persons, of which the details are: in 2018, 67 persons passed the interview, 42 persons did not pass the interview and 59 persons did not attend the interview. In 2019, 132 persons passed the interview, 70 persons did not pass the interview and 143 persons did not attend the interview. So the total for 2019 is 345. For 2018 earlier, 168 persons. In 2020, 41 persons passed the interview, 38 persons did not pass the interview, and 36 persons did not attend the interview, making the total number of licence applications for 2020 115 persons. In 2021, 22 persons passed the interview, 18 did not pass, and 30 did not attend the interview, making the total number of licence applications for 2021 78 persons. In 2022, attendance of candidates was full, 22 persons passed the interview and 25 persons did not pass the interview, making the total number of licence applications for 2022 47 persons. For oral question 75 from the Honourable Member for Pinang Tunggal, the same question also concerns the number who succeeded in obtaining a licence from 2018 to 2022. After coordinating among ourselves, I think the questions do not overlap. So, (b) list the names of the licence interview panel, which I answer as follows. Licence interview panels are not appointed in each district; instead, licence interviewers are appointed under the provisions of Section 118 Subsection 1, the Council shall appoint a committee called the Islamic Religious Teaching Supervisory Committee, which shall consist of the Mufti as chairman. Two, not less than 3 persons and not more than seven (7) persons who have suitable experience, knowledge and expertise. And the list of the committee concerned is as follows: Sahibus Samahah Dato' Seri Dr. Haji Wan Salim Bin Wan Mohd. Noor, Mufti of the State Government of Penang. Second, based on the requirement of not more than three (3) persons, not less than three (3) persons and not more than seven (7), are Yang Berbahagia Dato' Rosli bin Osman, Member of the State Fatwa Committee of Penang, Prof. Madya Dr. Atikullah bin Abdullah who is also a Member of the State Fatwa Committee of Penang and a lecturer at the School of Humanities, USM, Ustaz Ahmad Hashim Al-Hafiz, Head of the Centre for Quran Memorisation Studies (KITAB), Ustazah Rohayati binti Daud, former Coordinator of the Counselling Intervention Programme, namely a counsellor at USM, Ustaz Mohamad Salmi bin Suhaimi, who is a Member of the State Fatwa Committee of Penang and currently Head of the Research Unit at the Department of the Mufti of the State Government of Penang, Ustaz Subki bin Muhammad, who at that time was a lecturer at IPG Kampus Tuanku Bainun, and then Ustaz Muhammad Hanif bin Omar @ Wahab, who is the Head of the Dakwah Division of JAIPP. That is all.
Thank you. Please, Penanti first.
The drastic action taken today under the EXCO for Religious Affairs, although it is said to be in accordance with guidelines and regulations. We have discussed this matter at length two or three days ago. So what guarantee is there to ensure that these rules and enactment are not misused for political interests? That is all.
In response to the question on whether it is not misused: it is based on regulation 13, which I answered earlier, namely that after being granted a licence under regulation 13, or for those who already hold a licence, they must still comply with the conditions set under regulation 13. There are seven matters based on that: not spreading teachings that contradict Ahli Sunnah Wal Jamaah, not touching on any matters relating to royalty, not offending the feelings of any race, not insulting matters of khilafiah, not touching on party political issues, not touching on the personal affairs of individuals, and they must comply with any regulations, and also based on the answer I gave earlier regarding the Tauliah Monitoring Committee chaired by Sahibus Samahah. These persons are not directly involved in any activities or political parties that I mentioned earlier, where its members consist of those chaired by Sahibus Samahah, and there are also State Fatwa Committee members: Dato' Rosli Osman, Prof. Madya Dr Atikullah bin Abdullah, Ustaz Ahmad Hashim Al-Hafiz, Head Lecturer of the Centre for Tahfiz Al-Quran Studies and Counsellor at USM. The fatwa members are also ustaz, and they are not involved in any party politics, and in terms of the process, it will go to the Tauliah Monitoring Committee for Islamic Religious Teaching, and they are not involved in any party politics.
Terima kasih.
Soalan tambahan.
Sila.
Thank you, Dato' Speaker. My first question: earlier I heard the rather high figure of those who failed. For those who failed, were they told the reasons for failure, and were they called for a second time? My second question is, what efforts has the Penang State Islamic Religious Council taken to facilitate the process of obtaining a licence?
The application process for a licence, the process of obtaining this licence, is not carried out at the Penang State Islamic Religious Council. It is carried out under the Penang State Islamic Religious Department, under the Director of Islamic Religious Affairs, and under the Dakwah Department. Those who fail will be allowed to apply again and retake the examination, which I have announced during the winding-up session of my speech regarding certain categories. Some among them are not proficient in certain areas, so they need not apply for category (d), which covers all sections, meaning a licence for all sections. In terms of future improvements, we will improve the application process online. We are currently working on building an online application system, and God willing, once this online application system is completed, the process will be like applying for universities. Within one week we will know whether it is approved; the forms are being processed. Even now there is a time frame, but it is done manually.
Thank you. Perhaps one more. Yes, please, Sungai Bakap.
Thank you to Dato' Yang di-Pertua, for the EXCO from Batu Maung. So regarding this licence, what about political figures, because previously there was a letter stating that Honourable Members are not allowed to give lectures at mosques or surau even if they have a licence. My question is, does the definition of politicians include those who have become Honourable Members, or those who usually contest elections? We want to make these matters clear. Thank you.
Terima kasih.
Alright, regarding who is a politician. These are politicians who are not permitted, namely politicians who hold the position of people's representative. That is the first. The second, politicians who contested but have not won, not lost, and are given a certain period, for example under the regulations issued, for a period of five (5) years they are not permitted to give lectures or talks. That is in terms of the regulations that have been approved, whether politicians who contested in this state or in other states, to prevent what cannot be avoided, because in monitoring matters involving regulation 13, clause 5, not touching on party political issues, it still happens even though they say no, but through monitoring it touches on party matters too, so they violate regulation 13, clause 5. That is why the regulation was made and approved.
Terima kasih.
Add one more. So I, Batu Maung, mentioned that politicians who contested and who lost within five years, after this, please come and see me, because I indeed have politicians who have not yet won but who give lectures in my own area in Sungai Bakap. Thank you.
Okay, thank you. I invite Bagan Jermal. Please.
Dato' Speaker, my question is question 43. 43. Will the State Government take steps to review all drainage systems, for example those more than 30 years old, so that they can be upgraded to cope with today's rainfall capacity?
Thank you, Dato' Speaker, and thank you to the Honourable Bagan Jermal. Honourable, the State Government, through the local authorities (PBT), indeed gives attention to drainage systems, especially drainage more than 30 years old, so that they can be upgraded to cope with today's rainfall capacity. Among the early steps that have been taken is the preparation of a list of priority flood hotspot areas. Next, certified surveyors will be appointed to carry out basic measurement work and prepare utility plans based on the priority of these hotspot areas. Design plans will then be prepared either in-house at the PBT for small-scale studies, or by appointing consultants for large-scale studies, to upgrade the drainage system concerned. Allocations for implementing the study results will be applied for through the State Executive Council (MMK) Flood Mitigation Committee and also to the Federal Government according to the priority of these areas. However, project implementation is subject to the approval of the allocation obtained. Thank you, Honourable.
Soalan Tambahan.
Sila.
Thank you, Honourable Tanjong Bunga. We know that upgrading is very important because it not only can minimise flash floods but also helps in one more matter, because we can see the similarity between dengue hotspots. Dengue hotspots are usually old housing estates, for example in my area, Taman Melur. As we know, old drains will silt up, and that will affect the gradient and cause water to pool, which provides a very suitable place for Aedes mosquito breeding. So my question is, does the State Government provide a specific budget for this purpose, to solve both problems: first, flash floods, and at the same time, mosquito breeding from its source, because I feel fogging and gotong-royong are reactive approaches, and I think we should adopt a preventive approach, "prevention is better than cure", and also "one stone two birds", which is more effective. Thank you.
Thank you, Honourable Bagan Jermal. The State Government has several sources of allocation for implementing drainage upgrading. It depends on the agency that owns the drainage system. For example, if the drain belongs to the Public Works Department (JKR), then as the owner agency, JKR will prepare it, and the allocation can come from several sources. For example, it can be taken from state applications, or at the PBT level there is also a specific allocation, for example the Seberang Perai Municipal Council (MBSP), if I am not mistaken, RM300,000.00 a year is set aside to upgrade old drainage systems. But apart from that, owner agencies, for example the PBT or JKR or the Drainage and Irrigation Department (JPS), can also apply for allocation directly to the Flood Mitigation Committee of the State Executive Council (MMK), where the proposal will be examined, and if approved, the allocation will be given to carry out the upgrading work. Thank you, Honourable.
Terima kasih.
Supplementary question. Let's say in my area there are 17 housing estates that are more than 30 years old. Does that mean all of them will be taken for study, and how will priority be given? Is it on a case-by-case basis, or do we need to apply first before it will be considered for approval?
I think that matter can be discussed with the Council or Council Members as well, and if necessary, a more detailed planning for those 17 areas can be done, but to do all 17 at once, I think the cost is quite high, Honourable. So perhaps we can plan it in terms of timeline and so on. Let's discuss with the Honourable Jawi as well.
It doesn't matter. Today's pay, half of Jawi's pay, for Tanjong Bunga, because Tanjong Bunga answered his question. Okay, next I would like to invite Seberang Jaya. Seberang Jaya is not present and I have not been informed, so this question will certainly be skipped and cannot be answered. But it is a great pity, as a reminder to all Honourable Members here, that as long as you are not in the House, your oral question will not be answered. It is a pity the House cannot hear the question and the House also cannot hear the answer, which is a very great pity. And although on the previous occasion some Honourable Members were also absent, they did inform the Speaker, but Seberang Jaya did not inform me. Even if he came, I would not allow it. Okay, I would like to ask, who? Question 45, please. Bukit Tengah. The same reminder also applies to Bukit Tengah, he did not, but what's his name, Bukit Tengah did inform yesterday.
We have this evidence.
No. Because he had, what's the name, a death in his family, so he informed me. But it's a friendly reminder. Sungai Bakap, please. Oh, question 46 was already answered together with question 42. So this question has also been answered. So I would like to invite Sungai Dua.
Mr Speaker and all my beloved fellow members of the State Legislative Assembly, my question is question number 47. 47. To what extent does the discharge of waste from the Bukit Toh Alang Water Treatment Plant (LRA) in Sungai Kulim affect the water pumped at the Mak Sulong Pump House for raw water storage at Mengkuang Dam? (a) What preparations has the State Government made to face the El Nino phenomenon, which affects the water supply for the people of Penang?
Terima kasih.
Thank you, Dato' Speaker, and thank you, Honourable Member.
Is this also PBT?
This one is not, this one is PBA.
Oh.
Dato' Speaker, so to answer the Honourable Member's question, based on PBA's observation so far, there is no problem caused by the effects of waste discharge from the Bukit Toh Alang Water Treatment Plant. That is all so far, Honourable. This is because the treatment plant is small, only 40 MLD. The waste is also not much. Furthermore, for the information of the Honourable Member from Sungai Kulim, at the Mak Sulong Pump House we only use it for 3 months a year, only during heavy rainy season. Other than that, because the water level of Sungai Kulim is insufficient, not high enough, we will not pump. This is because if we pump, it will affect irrigation and so on. So for the second question, Honourable Member, El Nino, which causes hot and dry weather, is a challenge to the whole world in supplying clean water. The enlargement project of Mengkuang Dam has been implemented to increase its capacity from 20,000 million, or 20 billion litres, to 86 billion litres of water. This project was completed in 2017, and at the same time the State Government is also in the process of ensuring that the Federal Government continues to implement Phase 2C, which enables the transfer of 1,000 MLD of raw water to the Sungai Dua Water Treatment Plant. With such a transfer, we can ensure that the Sungai Dua Water Treatment Plant can function optimally even if something happens, such as pollution of the Muda River. In addition, the State Government will continue to hold negotiations with the State Government of Perak to ensure that the Perak-Penang Water Project can be implemented speedily. Thank you, Honourable Member.
Terima kasih.
Supplementary question. Mr Speaker, and also Tanjong Bunga, regarding this water treatment plant waste, it's not only today. I forgot to raise it for Sungai Dua as well, because this waste causes the drain, or ditch, let's use our village language, we call it parit, so it becomes silted up, causing what do people call it, the Sungai Mati Perai cannot be silted. Previously that river was a deep river. Recently the cleaning work carried out, I see, means that dredging has not been done, which causes the waste to increase, as people say "padan sungai", people say it becomes cangkat, and when heavy rain falls it will cause flooding. I, that is, I need attention to be given to what do you call it, this issue.
Thank you, Honourable Leader of the Opposition. Actually this issue is already under PBA's attention. The waste or sludge produced from the treatment process, and PBA has indeed made plans to carry out sludge management, and I have been informed that a contractor has just been appointed so that this problem can be overcome, thank you.
Thank you. Before I continue, I have just received information that although I gave a reminder to the Honourable Seberang Jaya, he had actually informed the Honourable Chief Minister that he could not attend because he had to go to the clinic and would return at 11.30, but he made a mistake. He should have informed the Dewan Secretary or me, that's all. He didn't know, this reminder must be a bit stronger, he didn't know who looks after the House. Okay, we forgive Seberang Jaya because he wanted to go to the clinic. Okay, and I would like to invite the Honourable Penaga. Please.
Thank you, Dato' Yang di-Pertua. Penaga's question number 48.
48. How much is the State Government's annual allocation to the STATE ASSEMBLYMEN (ADUN) of the State Government for each State Legislative Assembly (DUN)?
Y.A.B. Chief Minister: Thank you, Honourable Penaga. For the information of this honourable House, the allocations disbursed by the State Government to Members of the Government side are as follows. KADUN Special Account RM200,000.00, Community Development Project P16(02) RM120,000.00, and Special Programme and Training P16(03) RM180,000.00. Total RM500,000.00.
Thank you. Please.
Thank you, Dato' Yang di-Pertua, and thank you to the Honourable Padang Kota who has given an answer relating to my question, the annual allocation of the State Government to the STATE ASSEMBLYMEN of the Government for each State Legislative Assembly (DUN). Only on the Opposition side, that allocation is not given, and we are only given for infrastructure, RM60 thousand a year. I see this scenario, if the times, and the Honourable Padang Kota may also have experienced the situation as an Opposition during the era when BN administered this state of Penang, it was very painful, complicated and difficult when allocations were not disbursed. For the near future, or let us take the scenario of the change in our country's political climate and towards a more transparent democracy, as we see today, if we look at our neighbouring states to the north and south, the Honourable Menteri Besar of Kedah dared to take the responsibility and decision to distribute allocations equally to all people's representatives, whether Government or Opposition, and likewise the Menteri Besar of Perak also took the same stance. So my question to the Honourable Padang Kota is, perhaps the policy that was made is a policy from the last term inherited from the Honourable Air Putih as Deputy, Air Putih as Deputy, as Chief Minister, perhaps that policy was taken from the last term, that policy should be changed. And I want to ask, my question is, does the Honourable Padang Kota have the courage to change the policy that has already been made by the former Chief Minister, because courage is needed to change a policy that has already been made. And finally I want to give a pantun to the Honourable Padang Kota: "Pisau tajam mengenai kaki, darah tumpah mengalir ke lantai, walaupun kita berlainan parti, demi rakyat peruntukan mohon diberi."
A sharp knife cuts the foot, blood spills and flows to the floor; though we belong to different parties, for the people, please grant the allocation.
Pantun balik.
Thank you to the Honourable Penaga. For the answer to this honourable House, my courage is to maintain the allocation until it is reviewed.
Okay. I want to ask, what's the name of the Honourable Permatang Berangan. Please.
Thank you, Dato' Speaker, Negeri Johor, Negeri Sembilan, my question is number 49. 49. State the efforts and action plan of the State Government in ensuring food security for the people of Penang, especially in strengthening the paddy, vegetable, livestock and fisheries sectors.
Thank you, Dato' Speaker.
Already answered during the winding-up, you may summarise, yes.
Okay. In my winding-up, I have discussed many matters, but I would like to add three work initiatives to be carried out in the coming session. The first of these three additional initiatives concerns the Penang Agrifood Digitalisation Project. We will digitalise this agriculture sector, and at the same time it will help farmers, operators and the other related parties to be more efficient in identifying the level of our food stocks, and also help the State Government to plan for food security. The second, we encourage the use of IoT, namely (with permission) Restructuring and Digitalizing Paddy Farming, which aims to ensure that paddy production is carried out optimally using IoT technology. We will implement this in stages across the whole State of Penang, and also with the permission of the landowners. Finally, we will carry out the Penang State Integrated Ruminant Centre Project and the Penang State Integrated Ruminant Food Production Centre, in stages, with assistance from the Government or the Ministry of Agriculture and Food Security (KPKM). Thank you.
Thank you. Yes, please, Permatang Berangan.
Supplementary question, Dato' Speaker. For how long can our stocks of basic raw materials and staple food last if disasters occur, for example a prolonged drought or a major flood? We must have stocks, surely. Food security must exist, right? How long do we have stocks? For how long are these stocks meant to last?
Thank you, Honourable Permatang Berangan. In fact, at the State Government level we do not have data directly. That is why we are actively implementing this Agrifood Digitalisation Project. From this, we can create or identify our food security, the total of existing food stocks, and also predict what will happen in six months or three months' time. Thank you.
Thank you. Please.
I am interested in the answer given by the Honourable Member just now. I would like to ask whether there are proposals for the production of cage fish in the sea and also in brackish water cages, because this is a fairly large industry. Before COVID, its value was nearly, not nearly, it was more than RM700 million. So, that is an industry of great value for Penang, and whether the Honourable Member proposes to introduce digitalisation as mentioned just now, and whether the Honourable Member has also met with cage fish farmers and freshwater and brackish water farmers so that we can develop it. And we also have a, what is it, Bangsa-Bangsa Bersatu Fish. How can they be asked to help the government so that this industry can be expanded and developed? Thank you.
Thank you, Honourable Air Putih. The State Government has planned, or is finalising, a white paper, namely the Penang Aquaculture Industry Zone Paper, which is to gazette these areas for cage fish industry players. Currently there are five, and we will add more areas where we can further increase the number of these industry players. As Honourable Air Putih said, the Penang State Government has achieved high yields, and Penang is among the highest states in the production or industry of cage fish, and I will study the Honourable Air Putih's proposal for assistance from outside parties, especially for these cage fish industry players. Thank you.
Thank you. I would like to invite Pinang Tunggal, please.
Thank you, Dato' Speaker. Salam Penang 2030. My question is number 50.
50. The population in the Pinang Tunggal state constituency (DUN) has increased drastically. What efforts are being made by the State Government to build a health clinic in this DUN? (a) What is the ratio of one doctor to the population in Penang and in the Pinang Tunggal DUN at present? (b) What action will be taken if that ratio is not achieved?
Thank you, Honourable Dato' Yang di-Pertua. Thank you to my colleague. Sorry for my voice; yesterday a leopard mauled an elephant's grandfather. Sorry, today my voice is a little weak. Thank you for the question raised by the Honourable Pinang Tunggal regarding the issue of clinic development in the Pinang Tunggal area. For the information of this august House, the Penang State Health Department is still planning to build a health clinic in the Pinang Tunggal area. This plan requires the approval of the Ministry of Health Malaysia and also the Ministry of Finance Malaysia. However, the Skim Perubatan Madani, which has been introduced in all districts in the State of Penang, allows all recipients of the Sumbangan Tunai Rahmah (STR) from the B40 group to obtain treatment at registered private medical clinics. And for the information of this August House, in the Seberang Perai Utara District, 19 private medical clinics are now offering the Skim Perubatan Madani, and this number is expected to increase with the participation of more local private medical clinics that will benefit residents, especially around the Pinang Tunggal area. The Honourable Pinang Tunggal's question also asked about the ratio of doctors, especially in the Penang area. For the information of the Honourable Pinang Tunggal, we do not have a ratio by State Legislative Assembly (DUN) area, but for the information of this Honourable House, the ratio of the total number of doctors to the population in the Penang area is 1 to 405 residents. The World Health Organization (WHO) recommended ratio of doctors to population is 1 to 500 residents. So, for the situation in the State of Penang, we are actually better than the recommendation put forward by the World Health Organization, where 1 doctor can serve 405 residents in this State of Penang. However, planning to increase public health services, including the addition of health personnel, is constantly carried out at the State Health Department and also the Ministry of Health Malaysia level. Thank you.
Soalan tambahan.
Sila.
Okay, I would like to touch on the opening of Setia Fontaines, which will create 10,000 houses, and the opening of Bertam Pinggiran, which will create 2,500 houses. So, if there are 12,500 houses with 3 or 4 people per house, the population will increase by double what it is now. So, what action will the EXCO take in this matter to follow that ratio?
Thank you, Honourable Pinang Tunggal. As I answered earlier, we are looking at whether there is population growth in certain areas, which will certainly be one of the factors for us to consider in providing more public health facilities in the local area. However, for the present period, as I raised earlier, especially in the Seberang Perai Utara District, we currently have 19 private medical clinics offering medical services. It can be said that these services are free, especially for the targeted group, namely the B40 group. So, I request that not only the Honourable Pinang Tunggal, but also our colleagues in this House, refer to the Skim Perubatan Madani website and refer and help the people in our areas, especially those in the B40 group, to obtain free treatment under this Skim Perubatan Madani. Thank you.
Thank you. Berapit, please.
Thank you, Dato' Yang di-Pertua. My question is question 51. 51. State the status and infrastructure plan for electric vehicle charging stations in the state. (a) How does the State Government encourage the use of electric vehicles?
Thank you, Dato' Speaker. I think it is half-salary Jawi.
Must give it too.
Must give. More than this. All my answers are about local government (KT) as well. Honourable, at the level of the Ministry of Local Government Development (KPKT), the guidelines for electric vehicle charging bays and development application procedures have been presented at the National Physical Planning Council (MPFN). It has been agreed for application and implementation in all State Authorities (PBN) and Local Authorities (PBT). These guidelines will be presented at the State Town and Country Planning Committee level for approval of application in both PBTs. The State Government always works together with the Federal Government and also industry players in an effort to encourage the use of electric vehicles in Penang. Among the efforts that have been implemented by the State Government are installing free electric motorcycle charging points in areas owned by PBTs on the Island and also in Seberang Perai. Holding engagement sessions with industry by organising discussions and presentations related to electric vehicles. MBPP has issued RFP Phase 1 for the installation of EV charging stations at 26 locations across the entire administrative area of MBPP, where this RFP is still at the evaluation stage. This installation will involve MBPP car parks, on-street parking and MBPP premises car parks, covering DC and AC Charging Stations. The installation work for EV charging stations is expected to begin in the first quarter of 2024. MBSP has prepared a site for charging electric cars at the staff car park at Menara Bandaraya, Bandar Perda. Encouraging developers to provide electric vehicle charging stations at several public facility areas in Seberang Perai and also facilitating the approval process of plans at the planning permission application stage. Thank you, Honourable.
Supplementary question. Thank you for the answer. My supplementary question is, given that the State of Penang is a green state. So, in order to achieve the Sustainable Development Goals, a green State Government of international standard. What are the challenges we are facing in adding EV charging stations, and also what are the KPIs of the State Government within 1 year or 2 years to increase the use of EVs. Thank you.
Thank you, Honourable Berapit. I will answer your second question first. Under Penang2030, we have set KPIs targeting 500 EVCBs, or EV Charging Bays, by 2030. 500 for the whole state, okay. As for the first question, the challenge, Honourable, at the level of the State Government and Local Government, we can only create parking places on land that we own. For privately owned land, that is up to the private sector. However, in terms of planning, through the guidelines we have made, which have been approved by KPKT, we can require several EVCBs in new developments. Apart from that, if we want to install DC Charging, the requirement for electricity is also one of the factors that must be considered. For example, if we want to build DC Charging, it requires a lot of electricity. So, one substation needs to be built.
If it is AC Charging, that can be done anywhere, Honourable. However, the charging time is rather long, Honourable. Thank you.
Thank you. Next, I would like to invite Bagan Dalam. Please.
Thank you, Honourable Dato' Speaker. My question is question number 52.
52. What short-term measures will be taken to address the severe traffic congestion problem throughout the State of Penang, especially from Butterworth and Seberang Jaya heading to the other side of the island such as Bayan Lepas and George Town?
Thank you, Dato' Speaker. Honourable Bagan Dalam, the State Government always strives to find solutions to overcome the traffic congestion problem, especially from Butterworth and Seberang Jaya heading to the Island such as Bayan Lepas and also George Town. The short-term measures and efforts taken by the State Government are as follows. Encouraging the use of public transport. At present, Rapid Penang has 237 buses operating in Penang. The number of buses will be increased in stages according to needs, to provide more efficient and quality services that cover social routes. In addition, the State Government has fully funded the Pas Mutiara for unlimited free travel for all daily users. Providing a Free Bus Service (CAT) within the George Town city centre to create an efficient transport system and also encourage the use of public transport. Thirdly, providing the CAT Bridge bus service on 2 routes, namely from Bayan Baru to Seberang Jaya and back, and from Bukit Mertajam to KOMTAR. Fourthly, the provision of the BEST service, or Bridge Express Shuttle Transit (BEST KOMTAR), for staff working at KOMTAR. This also helps solve the congestion problem from Butterworth and Seberang Jaya heading to the Island. Implementing several measures to reduce congestion faced by users, especially on the Juru-Sungai Dua Expressway, with the following. Reconfiguring road markings at certain locations between Juru and Sungai Dua to increase the number of lanes from 3 lanes to 4 lanes. Reducing conflict or weaving problems of vehicle movement from the service road entering the main route, such as installing New Jersey Barriers so that vehicle movement is smoother. Expressway users heading to Perai-Butterworth have the option of using the Butterworth Outer Ring Road to avoid congestion on the expressway stretch between Sungai Dua and Perai. Disseminating information to expressway users through social media, electronic media and also variable message signboards regarding current traffic conditions so that users can plan their journeys. Implementing an RFID system at the Toll Plaza. Realigning road markings at the following areas. The entrance to the Penang Bridge, southbound, KM 138.7, for realigning road markings to create a 5-lane route. The Penang Bridge southbound junction, KM 139.5 to KM 140.2, for realigning markings to make 3 lanes. The area before exiting the Juru Toll, northbound, by widening the route as a storage lane. The rest area on the northbound Juru side to the Penang Bridge exit slip road, by realigning road markings to make 4 lanes. The exit from the Penang Bridge to the north exit of the Seberang Jaya Mosque slip road, by widening the slip road and realigning road markings. Increasing enforcement actions and cooperation with the Police to control traffic on the Penang Bridge and other junctions. And finally, providing a high-speed boat ferry service for passengers and motorcyclists from Georgetown to Penang Sentral. Thank you, Honourable.
Thank you. And Bukit Tambun, please.
Thank you, Dato' Speaker. My question is question number 53.
53. Describe the daily production capacity of treated water at the Sungai Dua Treatment Plant (Loji Sungai Dua). (a) Describe the effective monthly water capacity at the Teluk Bahang Dam and the Air Itam Dam. (b) What is the status of the water treatment plant at the Mengkuang Dam and the water route to the Sungai Dua Plant? (c) Detail the status of the project to address the water supply in SPS.
Thank you, Honourable Dato' Speaker. Thank you, Honourable Bukit Tambun. PBA, as the operator of the water treatment plant, has recorded that the daily treated water production capacity at the Sungai Dua Water Treatment Plant is on average 983.4MLD. This is based on last year. Here is the record of the monthly effective capacity of Empangan Air Itam and Teluk Bahang based on the readings recorded at the end of each month. I remember this is in a table. Many statistics. I will give it to the Honourable Member in writing. But the latest I read for October, Air Hitam 81.5% and Teluk Bahang 94.4%. What I know now is that it is still increasing. Honourable Member, the State Government, through PBA, has reported that the water treatment plant at Empangan Mengkuang is in the final design phase, final design review by consultants appointed by PBA. Changes to the original design were made so that the new water treatment plant at Mengkuang is based on the concept of a park, or as PBA wants to call it, Mengkuang Park. It has aesthetic value and is also environmentally friendly. These design changes were made without neglecting the actual objective of LRA Mengkuang, namely
to produce 114MLD of treated water. Meanwhile, the construction project for the raw water conveyance from Mak Sulung Pump Station to the Sungai Dua channel has been completed. It is in testing and commissioning, as I reported the other day. And this is expected to increase our water capacity to convey to LRA Sungai Dua by 600MLD, yes. Honourable Member, apart from that, the State Government is continuing to press the Federal Government to implement Phase 2C, namely the remaining 400MLD, and also to build a new pump house, namely the Lahar Yooi Pump House. Thirdly, for question c, Honourable Member. The State Government or PBA has drawn up several water supply infrastructure projects to overcome the water supply problem in SPS, as follows. The first is the mobile water treatment plant at Taman Sungai Duri Indah, which is in the testing phase. I think, Honourable Dato' Speaker, all of these I have already mentioned last week when asked by the Honourable Sungai Bakap. Besides that, to add. The State Government is also planning to build the Sungai Kerian Phase 1 Water Treatment Plant in SPS with a treatment capacity of 114MLD, also to address the high water demand specifically in SPS. Thank you, Honourable Member.
Sila.
Thank you, Dato' Speaker. Thank you for the answer from Tanjong Bunga. We are well aware that the Perak-Penang water project can only begin operating within the next 10 years if all negotiations proceed smoothly. However, Penang, especially Seberang Perai Selatan at this time and also in the next 10 years, faces a water shortage issue. Until now, PBA's comments have been decisive in approving applications for planning permission for the construction of factories or industrial projects in Seberang Perai Selatan, especially in Batu Kawan, before we submit planning permission applications at BKIP 2 and BKIP 3. In the answer given by Tanjong Bunga just now, it was said that we are still waiting for federal approval regarding the Lahar Yooi Pump House project, Phase 2C. If the federal government still does not carry out this project, and the Sungai Kerian pump house project only involves 114 MLD, can we withstand the challenges in the next 10 years? Apart from the details of the status of the minor upgrading in SPS, what other ways are there for us to withstand this challenge? That is all, thank you.
Thank you, Honourable Bukit Tambun. We, Honourable Dato' Speaker, actually all these small projects will help SPS in the short and medium term, and the medium term is the Sungai Kerian Water Treatment Plant (LRA). So if the 114 MLD is completed, Honourable Dato' Speaker, then the issue in SPS is actually resolved. Because it will be sufficient. But apart from that, PBA has now asked PDC to impose 25% internal recycling so that in all new developments of new factories being built, the water
that can be recycled will reduce the burden on water from PBA. This will help to reduce it, and at the same time we have projects that I have mentioned earlier, which were in the winding-up last week, no, not winding-up, but in answering oral questions last week too, it was mentioned. Apart from that, we have Bukit Panchor, which has already started at 10 MLD, and also other projects that the Honourable Member also mentioned earlier, such as the Mengkuang water treatment plant, which will also help. That is an additional 114 MLD. What I did not mention in my answer earlier is the proposed water treatment plant at Sungai Muda as well. So three water treatment plants totalling 114 MLD are being planned by the State Government. Then Sungai Dua will be upgraded, which will also add about 100 MLD. So we can see that in the short to medium term, an additional 300 to 400 MLD. This alone is actually enough to meet our demand until 2030. Thank you, Dato' Speaker.
Thank you. Honourable Members, the one hour and thirty minutes for oral questions has now ended in accordance with Sub-Rule 26 (7) Peraturan-Peraturan Majlis Mesyuarat Dewan Undangan Negeri Pulau Pinang. Please, Honourable Chief Minister.
Y.A.B. Chief Minister: Honourable Dato' Speaker, the answers to the oral questions that were answered just now will be placed on the tables of the Members who asked them and will be included in the official record. Also, Honourable Dato' Speaker, in accordance with Rule 6A (1), Peraturan-Peraturan Majlis Mesyuarat Dewan Undangan Negeri, I request that the sitting today be extended until 6.30 pm.
Thank you, Honourable Chief Minister. Honourable Members, the Chief Minister has moved a motion under Rule 6A (1) to extend the time of today's sitting, Monday, 27 November 2023, until 6.30 pm. Honourable Members who agree, say "Ya".
Members of the House: "Ya".
Honourable Members who do not agree, say "tidak". The motion is accepted and agreed. In addition, while we extend the time until 6.30 pm, I also wish to announce that we will take a break for lunch, expected to be from 12.30 until 2 o'clock. Honourable Members, we are now in the debate session on the Rang Undang-Undang Perbekalan (Appropriation Bill) for the year 2024 and the motion on the development estimates for 2024. I would now like to invite Honourable Members who wish to take part in the debate session. Perhaps I will give the floor to the Honourable Leader of the Opposition. Please.
Assalamualaikum warahmatullahi wa barakatuh, and greetings of peace. Alhamdulillah. (recitation of part of a verse from the Quran). Dato' Speaker, the Honourable Chief Minister, all members of the State EXCO, fellow Honourable Members, heads of departments and agencies, and also directors-general. Next, with permission, Speaker, I welcome the delegation from Dewan Muslimat who are visiting the House on this occasion. Next, all of you whom I love. Thank you, I extend my thanks to Dato' Speaker for providing the space and opportunity for me to debate the 2024 Budget that was delivered by the Honourable Chief Minister of Penang on 24 November 2023. Mr Speaker, Allah SWT says in Surah Al-Maidah, verse 8 (recitation of part of a verse from the Quran). The word of Allah Ta'ala, which means: "And let not the hatred of a people prevent you from being just. Be just, for that is nearer to righteousness." And again the word of Allah SWT, (recitation of part of a verse from the Quran), "so that wealth does not circulate only among the rich among you." In Islam we are taught to be just to all, including to a people whom we do not like. Islam forbids the hoarding and monopoly of wealth by the rich. Indeed, it commands that distribution be carried out justly. Justice according to Islam is not the same as the Western understanding, which interprets it as equality. The Western interpretation is that justice is equality. Islam's definition of justice is to put something in its right place (recitation of verse from the Quran). There is a saying, "Whatever you do, cut the shirt so that it fits the body." The size of the shirt we give to someone must match the size of that person's body. With permission, the body size of Telok Ayer Tawar, he has his own size. Because he wants to be compared with me. I am XL, he may be... I don't remember how much, I don't know.
Don't make insinuations. Don't make insinuations.
Here I want to make one comparison. It is not the same. So the shirt size given to me, if it were given to Telok Ayer Tawar, might not be fair. Especially if our friend, our colleague from Pengkalan Kota, gave his shirt to Telok Ayer Tawar, that would be unfair because it cannot be worn. Likewise, if we give a teluk belanga to a son and a baju kurung to a daughter, that is fair. Do not, because we want to follow the Western interpretation of equal sharing, give a baju kurung to the son and also a baju kurung to the daughter. That is not fair.
Justice means putting something in its right place. That is, a teluk belanga for the son, and a baju kurung for the daughter. That is fair. It is unfair to give everyone one size of shirt only. It is unfair for us to make shirts in one size. What is clear here is that the definition of justice according to Islam is more precise and perfect. Mr Speaker, winning in an election is not like winning at gambling. In gambling, whatever is at stake becomes the property of the winner. Instead, winning in an election is for the purpose of upholding the Government, to fulfil the trust and to carry out justice. Do not practise the politics of colonialism, which monopolises revenue and oppresses and squeezes its people. As Allah SWT has revealed through His word in the verse (recitation of Quranic verse). Its meaning: "The Queen of Sheba said (in her response to the letter sent to her by the Prophet Sulaiman AS), she said that indeed kings (whom she had witnessed), when they conquer a land, they destroy it and make its people, the noble ones among them, into the lowly; thus they will do." Be leaders of the Government who fulfil the trust and carry out justice. Do not practise the politics of the very rapacious coloniser. The treasures of the government must be managed in the best way. Give rights to those who are entitled, for the sake of goodness and prosperity shared together, so that the running of the government and this state will receive blessings. Here I wish to call upon the Government that in allocating funds it must be fair. Fair to all communities and races, all the people regardless of their political beliefs, religion and position. Allocations to the opposition ADUNs must be given fairly to fulfil the equality of fundamental rights as legitimately elected people's representatives. Every ADUN has its role in helping the people in their area who need assistance. Do not let it come to "genggam tak tiris", as the old proverb goes, that is, stinginess. Let it be "rahmah", which is indeed suitable to the nature of Madani.
Mr Speaker, the Budget 2024 that was tabled by the Chief Minister shows that for the first time, expenditure exceeds RM1 billion compared with revenue of RM533.08 million, a deficit of what do you call it, RM514.5 million, which is equivalent to 55%. The budget has been seen to be in deficit since 2011 until it reached 2024, causing the reserves to shrink more and more, or savings to fall further, to as low as RM1.67 billion on 15 November 2023. This trend is very unhealthy for the finances of the state of Penang. If this strategy continues, it is feared that the State Government's finances will not be sustainable over the long term. I want to know what the government's solution is for replenishing the savings reserves and reducing the deposits for the future. The proceeds from the sale of land to meet the demand on the government is a step that causes us to increasingly lose valuable assets in this state; do not let all the land of this state be mortgaged to other parties. The State Government can develop government land using the Private Public Partnership (PPP) method, Government and Private Sector Joint Venture. Land owned by the government is developed by a private company in return, so the private party pays a concession to the government.
Mr Speaker, from my reading, the gross domestic product (GDP) for the State of Penang was 5.1% in 2018, fell to 3.8% in 2019, rose again to 5.6% in 2020, continued to increase in 2021 at a rate of 6.8%, and most recently soared to 13.1% for 2022. I strongly agree with the speech of the Tun Tuan Yang Terutama Negeri Pulau Pinang earlier, who requested that development allocations from the Federation be increased for the state, considering that Penang has succeeded in raising the state's GDP from 6.8% to 13.1%, which benefits the nation. The increase in GDP in 2022 is very high compared with 2021, namely an increase of 6.3%. My question is, why is this increase so high compared with the previous year? If we look at the GDP before the COVID-19 period, it was not as high as the GDP for 2022. Is it not true that at this time the country's administration was run by Perikatan Nasional? This shows how the Perikatan Nasional Government acted fairly while administering the country, regardless of the state's political party background.
Mr Speaker, in the Budget 2024 speech, it was mentioned that the State Government also received approval for funding from the World Bank to implement projects such as Urban Greening for the construction of Pocket Parks. My question is, is this allocation a loan or a grant? How much funding has the State Government received from this project? What are the conditions that have been set by the World Bank for this fund? I am worried that the state's expenditure, which has been in deficit for 11 consecutive years as informed by the Chief Minister earlier, will persist when the State Government has to pay the loan taken from the World Bank.
Mr Speaker, from what I understand in the Budget 2024 speech, InvestPenang and the Penang Development Corporation (PDC) play a major role in supporting industrial growth. My question is, the special adviser on investment to the Chief Minister of Penang and board member of InvestPenang, Datuk Seri Lee Kah Choon, resigned on 2 October, while investment is increasing in Penang. Why did he resign? Has he been replaced? I request an explanation. I was rather surprised when checking the PDC report book provided to us why the houses built by PDC are sold at high prices. I would not be surprised if such a project were sold, if I were not surprised if such a project was sold by the private sector, expensive houses sold by the private sector. But if a project from a subsidiary of the State Government sells expensive houses, this is rather strange, because a government subsidiary should help the government, that is, provide solutions to the housing problems we face in the State of Penang. Mr Speaker, I was informed from the Budget 2024 speech that, in the government's effort to assess the feasibility of redevelopment of the scheme, five schemes or five locations have been identified for implementation of this scheme, namely Mahsuri 5 Point Block, South West District, Taman Free School, North East District, Padang Tembak Flats, North East District, Mak Mandin Flats, North Seberang Perai District, and Siakap Flats, Central Seberang Perai District. I want to know further: first, what percentage of the new development is for Affordable Housing? Second, what offers are there for the original residents? Third, will the original residents return to their original area or be relocated to another area after the redevelopment? Fourth, will they be offered new, larger homes, or will they receive compensation? Fifth, where will they live temporarily during construction? If they live in rented housing, must the rent be paid by the government until the house is completed? I request an explanation.
Mr Speaker, I want to get an explanation regarding the 4,738 new job opportunities from 60 projects recorded by MIDA this year, from January to June 2023. Which sectors are providing these job opportunities, and are these jobs for local workers or foreign workers? I request an explanation.
Mr Speaker, I am also interested in the Penang Skills Development Centre (PSDC), which is the leading training institute in the state of Penang, enabling local industry to obtain suitable workforce for their companies. I understand that students at PSDC are always in demand by industry when they graduate. I want to know more about the fields offered by PSDC and what are the eligibility requirements for entry there? Is there a special State Government scholarship for them, given that their chances of getting a job are bright, and indirectly this helps to increase the state's economic growth? I request an explanation. In addition to providing a suitable workforce for companies that need it, I would also like to suggest that the government provide a special allocation within human capital to produce occupational safety and health professionals to prevent workplace accidents, based on statistical data from the Department of Statistics for 2022 showing that Penang is among the five states with the highest rate of occupational accidents or injury rates, namely 3.35% per year, or 2,925 workers. The government needs to set a target to reduce this occupational accident rate.
Mr Speaker, based on what the Chief Minister said in the Budget 2024 speech recently, the installation of closed-circuit television (CCTV) cameras totalled 1,217 units installed by both local authorities (PBT), namely 1,019 CCTVs installed in the Island area while 198 CCTVs were installed in Seberang Perai. My question is, why are so many CCTVs installed on the Island compared with Seberang Perai? In which areas are most CCTVs installed? What are the achievements from installing so many CCTVs? I want to request an explanation.
Mr Speaker, the total collection obtained through the e-payment platform at all 56 public markets in Penang is 4.1 million transactions valued at RM39,771 million. That is a very large amount and is actively generated by those who trade in public markets. My question is, does this collection involve rental of market premises or buying and selling transactions? Do these 56 include the Teluk Kumbar Public Market, which people say has still not been upgraded, the market in Bayan Lepas, and also the one in Sungai Dua? I have not yet used this cashless transaction at markets; at the market people still bring cash to spend at the market.
Mr Speaker, the Federal Government has announced an allocation of RM10 billion for the implementation of the Penang to Seberang Perai Light Rail Transit (LRT) project. I want to know further whether this RM10 billion is a loan or a grant from the Federal Government. Is this amount sufficient to build an LRT linking the Island and Seberang Perai, together with the LRT alignment that has been approved on the Island connecting KOMTAR to Bayan Lepas and onward to Seberang Perai? I request an explanation.
Mr Speaker, regarding the PSI project, whatever it is called, Penang Silicon Island or Penang South Island or Penang South Reclamation, I want to know from where the stones and sand to be used for this project will be obtained. Will the sand and stone come from quarry projects that will be studied by the State Government, as stated in the answer, to be used for housing projects? Is the purpose of that project also reclamation for the PSI as I mentioned earlier? Does the water management plan in this state take into account the island that will be built, considering that treated water from Perak takes 6 to 10 years? We are worried that this state will experience a water crisis as stated in the Budget 2024 speech if this problem cannot be overcome.
Mr Speaker, in the Chief Minister's speech, the State Government also received an allocation of RM25 million from the Federal Government for the conservation and management of the George Town UNESCO World Heritage Site. This is a logical value, considering that preserving heritage requires a large cost and to remain relevant as heritage. My question is, what about other heritage sites in this state? There are two mosques in Sungai Dua that are listed as heritage buildings, namely Masjid Tuan Haji Rashid in Sungai Dua and also Masjid Tuan Samad, also in Sungai Dua. How much allocation has been provided by the State Government for these mosques so that they remain as heritage that is not swallowed by time? I often pray at this mosque. This mosque's roof is already old and the roof has rotted. When it becomes a heritage building we cannot touch it, we cannot do as we wish, we must renovate, but I was told by the chairman that they have so far not received anything, that is, an allocation from the Heritage side or from the government through Penang Heritage. We hope that the State Government can look at this matter, so that only colonial heritage is not looked after, while Malay heritage, which took root earlier than colonial heritage, earlier than the arrival of Francis Light here. The valley from what do you call it, from Butterworth all the way to Kepala Batas, is a valley visited by the ulama who travelled back and forth from Mecca to come here, so much so that those who travelled back and forth married local people, making that area rich with ulama and also descendants of the alim ulama, which consisted of that area being a very rich area with a centre of learning at one time, that came from all corners of this Asian region to come and study or live in a pondok in those areas. There were many great figures in that area, as well as the history of the pilgrim ship, which vanished without a trace, how the vessels or transport that once carried pilgrims to perform the Hajj in Mecca no longer exist today, and history is increasingly forgotten.
Mr Speaker, I am also interested in the Future Foundation Scholarship (PFF) provided by the State Government to students pursuing studies at institutions of higher education (IPT). I want to know further, of the 700 recipients, how many people received it according to race breakdown and also the State Assembly (DUN). And how much allocation has been disbursed by the State Government to them? What field, what field can, what do you call it, applicants apply for this scholarship, and what are the requirements for children of Penang to apply for this PFF? I request an explanation.
Mr Speaker, the State Government has also provided 98.50 million for the provision of grants to subsidiary companies, statutory bodies, state statutory bodies and other agencies. I want to know further what grants are provided and who receives these grants, and I request an explanation from the Government. That is all that can be said in the debate this time, and there may be other matters that I will take part in during the debates as long as this debate is held, so that we can nurture, that is, the practice of democracy in this august House, so that the running of this State Government will proceed correctly and in line with its purpose and objectives of establishment. That is all, may the good be to Allah, and any shortcomings are from me. I conclude with (reading of prayer) Assalamualaikum WBT and greetings of peace. Thank you.
YB..
Terima kasih.
Speaker, mohon.
Penanti. Sila
Assalamualaikum warahmatullahi taala wabarakatuh dan greetings of peace. Dato' Speaker, Penang is a state blessed by Allah SWT because of its very strategic geographical location in economic terms. Historically, Penang has attracted traders from the east and the west to settle and trade.
Therefore it is a failure, a failure if the Government in power cannot continue the success of these attractive factors to bring well-being to all levels of the people; the status quo, the positive development of the people, is something, with permission, by before and expected from any government in power. Dato' Speaker, as was informed just now by our Leader of the Opposition, he is very interested in the World Bank funds for the Urban Greening and Pocket Park projects. If these funds are a liability, or in other words a loan borne by the State Government, the use of these funds must follow the guidelines set by, to prevent leakage and misuse. The question arises: how can store management also be classified as Urban Greening? When a retention pond is seen as a Pocket Park. Perhaps the World Bank has given the green light, but with limited information such as the amount of funds and the status of the project, it is important so that the people as a whole can benefit from these funds. Economic growth as well as agriculture at 3.4% compared with 13.1% economic growth in Penang, and far lower than the economic development of the manufacturing and services sectors for example, has not had an even impact on the people of Penang, especially the farmers and fishermen. The Government should increase its efforts and attention, perhaps 200%, towards the contributors of this sector, who consist of the B40 group, in order to uplift their economic position. Programmes such as the petani pelapis and the tabung usahawan tani should be reviewed so that the impact is more positive and tangible. This sector should not be step-childed with support that is like scratching an itch from outside the shoe. Dato' Speaker, we see Penang2030 as an important initiative to set the government's goals on a realistic timeline. It should also be regarded as a work in progress with room for improvement. All 8 priorities are areas that help uplift the socio-economic paradigm of the people, but special emphasis should also be given to the development of housing and an environment suitable for all levels of society. This strategic initiative must take into account the economic breakdown of groups between B40, M40 and T20 and their specific needs. Housing project development should not be based only on corporate profit but also on corporate and government social responsibility. Today the majority of the people are forced to live crowded together in houses of 300 to 400 square feet under cost pressures and family size. The launch of PPR for single people, which is very critical, should be accelerated in order to help economic growth in terms of the supply of the workforce. Therefore, once again, emphasis on the field of public housing must become a main agenda of the state's economic development. Dato' Speaker, the State Government should consider more appropriate and effective methods in organising community, human capital and entrepreneurship programmes for SMIs and youth, so that the media network covers the whole society more widely. The use of digital bulletins, the State Government web portal, soc med or social media, and digital marketing techniques will help target programmes to those who need them. Programmes such as the SMART industry conference and SME Centre, i46 fun (unclear), founders greek 6 programmes GET, Tech Dome Penang, Techlympic Malaysian Digital CDD, ESG Incubation hard, SME 100, Penang CAT, PFF, all the themes of the PSDC courses, PISP BAES and others. At present, it is feared that these programmes are only concentrated among a small portion of society, the majority of whom are not aware of current people's programmes. According to the report, only 40% or 17 out of 41 KADUN have actively used the disc system. Is it because of weaknesses in the disc system that need attention? We do not want programmes and initiatives like this to end up as, with permission, white elephants. The project to install fibre optic cable throughout Penang is an important step in empowering the digital life of the people of Penang. The question is what the action plan will be after phase 4 to cover the Seberang Perai area, which appears to be left behind in digital development, and whether this fibre optic installation uses State Government funds or MCMC funds. Dato' Speaker, the BAES programme is important to ensure that every group in society is not left behind and is helped for the sake of survival. The programme aimed at PGK should be reviewed because of inflationary pressure and the rise in the cost of living since 2016. If we look at the report, it says it was taken in 2016. How many years have passed until today, and whether that study is still valid or not. And the expenditure of 3.7 million, or 0.35% of the 2024 management cost, must be given serious attention. Dato' Speaker, Penang has recorded budget deficits throughout this government's term since 2020. For example, the total revenue deficit against state expenditure exceeds 2.1 billion. Management cost expenditure of 1,047 million for the 2024 budget is twice the revenue, giving a deficit of 514 million, which is the highest deficit so far. If the government were transparent and frugal, and if the management costs recorded up to November 2023, amounting to 709 million, were used as a yardstick, then the total up to December this year is estimated at around 773 million, status quo, compared with the estimated management cost for 2023 of 989 million. So why should the 2024 management cost be nearly 35% higher than the actual 2023 management cost? On the increase in this management quota, the State Government estimates an addition of 10 million in revenue, while management cost rises by 274 million. Revenue rises by 10 million, so Penang goes bankrupt, Dato' Speaker. So our hope, Dato' Speaker, is that the State Government will re-examine the plan for the actual management costs needed for 2024 and take initiatives, perhaps as much as 400%, I don't know, to raise or increase government revenue so that the deficit can be better controlled, leakages are monitored and eliminated, management efficiency is improved, and controls are established for every high-impact project. KPI, with permission, Key Performance Indicator, is set and reviewed periodically by external auditors under the PAC, presentation of a report card, and follow-up actions that must be taken for more efficient, robust, trustworthy, honest, effective and transparent state financial management. Thank you, Dato' Speaker.
Thank you, Honourable Penanti. I invite Bukit Tambun.
Honourable Dato' Speaker, the Right Honourable Chief Minister, fellow comrades, heads of departments, gentlemen and ladies, good morning and greetings of peace. I feel grateful for the opportunity given to take part in the debate on the Supply Bill and Development Estimates 2024 in this honourable House. Honourable Dato' Speaker, based on the projected revenue for 2024 totalling 533.08 million, this shows that the Penang State Government is not a rich state. Furthermore, the proposed development budget for 2024 totalling 374 million also reflects that the State Government's budget is so pitiful. It is lower than the development budget of a public university in Malaysia. What is more worrying to us is that the 2024 Budget is expected to incur a deficit of 514.53 million, which will be financed from State Government reserves, including the consolidated trust account, which only had a balance of 1.67 billion in 2, up to 15 November 2023. In 2022 we had 1.859 billion, and in 2021 we had 2.17 billion, meaning a decline every year. This means the consolidated trust account will be exhausted if the state faces consecutive deficits in the future. This projection is indeed worrying, and that is why I have repeatedly urged the Federal Government to allocate large allocations to implement infrastructure development to tackle the problems of traffic congestion, flash floods, and also water supply. It is not that I intentionally want to pressure the Federal Government; just look at our accounts. Therefore, on this honourable morning, I want to debate in detail the operating expenditure, development expenditure, and also efforts to generate new revenue. Dato' Speaker, operating expenditure will increase by 58.13 million to 1.047 billion in 2024. Under the 2024 operating allocation, 205.9 million is for emoluments, which is 10 million higher than in 2023. In line with the digital era, the State Government, land administrators and also Local Authorities have implemented eTanah online submission, ePembayaran and various online applications. Accordingly, restructuring of positions in the public sector should be carried out. We do not want to dismiss civil servants; we want restructuring. That is important. Positions that are no longer relevant can be abolished, and existing civil servants need exposure to information technology and digital knowledge through training and courses. Implementing training towards improving civil servants' skills not only ensures they are more competitive but can also reduce the recruitment of new staff. The 21st century generation, our children, need to be cultivated with STEM education in line with the upcoming trend of technological modernisation, and be able to enter the manufacturing and services sectors. If these developments take place, the electronics, electrical, machinery and equipment, scientific and medical sectors, and green technology can reduce dependence on foreign workers, as the wish of all Honourable Members. There will be no issue of Pulau Betong objecting to the construction of the CLQ at Bayan Lepas. Dato' Timbalan Speaker can also sleep soundly if our children can fill the vacancies that will be left by foreign workers. Dato' Speaker, expenditure, grants and fixed charges, namely in (4,000), if according to what was distributed, remain the largest component of total operating expenditure, namely 622.59 million. This is an increase of 44.37 million compared with 2023. Among them is the state welfare programme including iSejahtera, which has cost 110.54 million. This is an increase of 12.19 million compared with 2023. It is high time the State Government conducted a comprehensive study to ensure that iSejahtera only benefits targeted groups. I am well aware that for the State Government or political figures, if a welfare or a programme that benefits the people is withdrawn, they will certainly lose popularity. Therefore, a comprehensive study must be carried out. This falls under the responsibility of Honourable Sungai Pinang as EXCO for Social Development; we need to examine it. We can no longer afford to spend recklessly. On the provision of grants.
Mohon pencerahan.
Machang Bubuk has already objected, already.
No, no. I, thank you Bukit Tambun, who has raised a matter that is very sensitive but extremely critical to consider. I feel that it has been 15 years since the Pakatan Harapan Government, and now the Unity Government is in power, and the Federal Government is also currently reviewing these targeted subsidies. Will the State Government also consider or review the provision of the iSejahtera scheme to targeted groups only, and no longer give it to all eligible Penang voters? So that is a good proposal, and I request that the State Government take this matter seriously, considering the financial constraints the State Government faces.
Thank you, Machang Bubuk. It is indeed a good proposal, but perhaps when the newspapers publish my proposal, I will become… (interruption) a person who is shot at.
Machang Bubuk at the back.
It's all right, Machang Bubuk at the back. On the provision of grants to subsidiary companies, statutory bodies of the state and other agencies, I would be glad if the Right Honourable Chief Minister could elaborate on the distribution of this grant totalling 98.5 million. Although operating expenditure increases every year, the Penang State Government continues to succeed in maintaining financial management with integrity, by receiving a clean certificate from the Auditor General for the Financial Statements in 2022. Dato' Speaker, here I want to emphasise that the recognition of an unqualified audit opinion refers to prudent financial management with expenditure free of leakage; it does not mean that the Penang government is a rich government. I stress once again that Penang is not a rich government.
Faham-faham.
Revenue estimates… (interruption) must speak again.
Repeat it again for those who need to hear, hear.
Yes. Dato' Speaker and Members of the House. The estimated revenue that can be collected in 2024 is only 533 million, which will result in a deficit of 514 million. Revenue 553, 533, but a deficit of 514 million. I think Perai, when he looks at this account, he laughs because he has been in the corporate world for more than 30 years, but this is the reality. We will face a deficit of 540 million compared with operating expenditure totalling 1.047 billion. This estimated deficit, as I mentioned just now, will erode the Consolidated Trust Account. Therefore, the State Government needs to be serious in exploring new revenue generation. First, the opening of industrial land by PDC and the private sector. This new industrial land will increase land application fees, land registration fees and first-year assessment, as well as recurring assessment once the industrial buildings are completed. In my opinion, oil palm and rubber plantations are no longer economic in the context of the State of Penang, due to constraints of economic scale, economies of scale, shortage of labour and pressure on demand for industrial land. We need to be aware that agriculture is divided into, if we follow our structure plan, padi granary plantations that must not be touched at all, livestock areas for chickens, goats, cattle, pigs, livestock areas in ponds as mentioned by Air Putih a while ago, and we also have permanent reserves. Permanent food production crops. Therefore, in this context, in my view in the State of Penang, oil palm and rubber should be relaxed for re-zoning or changed directly in the local plans. Second, I fully support the State Government's effort to nominate the Paya Laut Forest Reserve Complex along the coast from Penaga to Telok Ayer Tawar as a flyway site network. This new eco-tourism destination will attract more international tourists to land at Penang International Airport. This will drive a sudden surge in the services sector, especially the hospitality, transport, and food and beverage retail subsectors. In view of this, Honourable Perai and Honourable Paya Terubong need to ensure this nomination succeeds and that supporting infrastructure is developed. Dato' Speaker, thirdly, I also support the State Government's proposal to gazette the central reef area including Pulau Gazumbo as a sanctuary marine middle park. The success of this gazettement will revive the long-delayed water taxi service. The introduction of water taxis will make Penang a marine tourism destination through island hopping involving the national park, namely Pantai Kerachut sanctuary marine middle park middle banks, Pulau Aman, Pulau Gedung, Pulau Jerejak, Pulau Rimau, Pulau Kendi, and also the flyway site network mentioned earlier. Government-owned islands can be opened for RFP for the development of tourism products that can generate income. I have raised the question of ownership of the islands in Penang since 2018. The time has come for us to study exploiting or carrying out development, exploring the exploration of these islands. Thank you. Thank you to Bagan Jermal. Fourthly, the State Government needs to be aggressive in pioneering renewable energy (TBB) to generate new income, in addition to reducing carbon dioxide emissions and saving on electricity bills for government premises. Fifthly, given the change in housing demand patterns in Batu Kawan, the 23 phases of Affordable Housing development will need to be re-planned. We have 25 phases for the construction of 11,800 affordable housing units. The Penang State Housing Board and PDC should plan housing that the M40 group can afford. B40 is, of course, a continuing plan. The time has come for us to look after the M40 group, especially technicians and engineering assistants who are not eligible to buy affordable housing, and who cannot afford to buy higher-priced housing or luxury housing developed by private developers. Through the profits that will be obtained, the Penang State Housing Board and PDC can develop affordable housing in other areas that need it more. Everyone focuses on Bukit Tambun, and the others are jealous then. A small part, part of the remaining phases of this development can also be developed into a Special Rental Housing Scheme for the young or single people here who own land to implement this scheme. Dato' Speaker and Members of the House, although the development budget for 2024 has increased by 47.96 million to 374 million, it is still not commensurate with Penang's status as a rapidly developing state. The development budget, which has been described as a small-potatoes budget by the Honourable Chief Minister compared with the Federal Government's budget, is because the Federal Government's estimated allocation is only 21.6 million. We cannot even build an elevated highway from Sungai Dua to Juru. Out of the 374 million estimated development expenditure for 2024, only RM35,826,510.00 is allocated to JKR. Therefore, I really no longer dare to place hopes in JKR to resolve or upgrade roads that face traffic congestion next year. If large-scale allocations are no longer approved by the Ministry of Economy, this means the people of Penang will continue to face traffic congestion, especially during peak hours. In the Development Budget 2024, under VOT P01, it is found that the allocation for the Gurney Bay project has increased from 60 million to 80 million, and the allocation for PTMP has increased from 17.23 million to 21.23 million. May the Honourable Chief Minister explain the expenditure allocation for Gurney Bay and the period of future allocations. In the Budget speech, the Honourable Chief Minister mentioned that this project will be fully completed in 2025. What is the financial return if this project can bring financial returns to the State Government when the project is fully completed. The Honourable Chief Minister is also requested to give a more detailed explanation of the allocation for PTMP. Honourable Dato' Speaker, regarding the budget for sports and open-space development, although it has decreased from 18.9 million to 15.3 million for next year, will the State Government or the Sports Complex and Open Spaces Management Corporation be able to remain sustained or self-sufficient, especially through the development of Batu Kawan Sport City and the redevelopment of the Sony Complex in Seberang Jaya in the future. Dato' Speaker, in the expenditure estimate chart for 2024, the allocation for the Department of Agriculture is 6.93 million and for the Veterinary Department is 4.6 million. The Honourable Pantai Jerejak is requested to explain more clearly its use. In addition, under item 119, page 78, in the Budget speech, the Honourable Chief Minister, the State Government has channelled 1 million to the State Fisheries Department of Penang to boost the cockle industry. Here I would like an explanation: is this allocation for this year or the estimate for next year, and also the Honourable Chief Minister is requested to inform the amount of allocation to the Fisheries Department, because in the chart there is none for the Fisheries Department. We are well aware that Penang is the highest contributor to aquaculture production in this country, amounting to 681.2 million in 2022. Therefore, the aquaculture sector needs more attention from the State Government, not only for the cockle farming industry but also covering caged livestock, pond livestock and also fishermen. Next, I will put additional questions to the Honourable EXCO, about CCTV, which the Leader of the Opposition has highlighted. Second, the replacement of optical fibre cables in island areas has entered the third phase, and the fourth phase is currently being planned. Where are the plans and expected implementation timeline for telecommunications infrastructure, especially optical fibre installation, in Seberang Perai. Third, according to the records of the Halal Management Division, Penang Islamic Religious Affairs Department, as of September 2023, there are only 1,784 holders of the Malaysian Halal Certification in Penang. Is this figure encouraging, Honourable Batu Maung. To my knowledge, many Bumiputera entrepreneurs do not have Halal Certification because they consider the process rather difficult and burdensome, and when I buy belacan in Pulau Aman and I give it to my friends in Kuala Lumpur, they receive it with doubt. I have to explain that this belacan is made and processed by Malay Muslims. There is no halal certificate.
Malays make it halal, la.
Who knows, he doesn't know.
Malays certainly make it halal.
I am from Penang (interruption).
Malay… the Honourable Tambun, he must be halal, he is not non-halal. Unless the oil is cheated by Chinese factories or their factories (interruption), then it is not halal…
Withdraw, withdraw.
Telok Ayer Tawar.
Tarik balik.
Telok Ayer Tawar.
Withdraw, withdraw.
Tarik balik.
Tarik balik.
Withdraw this, Dato' Speaker. What is this.
Mr Speaker,
Chinese always cheat, aa. (interruption).
Telok Air Tawar, withdraw the word …
Eh. Telok Ayer Tawar, must withdraw.
I withdraw, okay, okay.
Don't be like that.
Telok Ayer Tawar does not understand… (interruption)
Say one thing, do another.
What I conveyed.
Pengiktirafan.
Goods that I buy from Malays to give to Malay friends, they don't know that I bought them from Malays because there is no halal certificate. If visitors go to Pulau Aman, they buy, they eat without doubt. What I mean is we need to help small entrepreneurs.
Ya.
In rural areas, to obtain halal certification, I have already raised this for a long time. We need to help small entrepreneurs, especially Bumiputera entrepreneurs in rural areas, that's all. We will continue. I congratulate PWDC for holding the women's session, the establishment of JPWK in every State Constituency, implementing the safe family policy, finalising the guidelines for the central postnatal and infant care centre, and facilitating the whitening of kindergartens and nurseries. Therefore, it is the responsibility of the Honourable Sungai Pinang once again to draft guidelines for elderly care homes. I am nearly 50 years old, in 10 more years I will need to enter an elderly care home. Therefore, let us together, Sungai Pinang, we need to draft a comprehensive guideline and at the same time, I propose that we plan elderly villages in Balik Pulau and Batu Kawan, for us to retire there later, for all the people of Penang. Next, Penang is a strata state and the State Government has allocated 348.5 million to maintain strata housing schemes. The problem with strata housing is inefficiency and lack of maintenance of buildings and shared facilities. Therefore, I call on the local authorities, especially MBSP, to empower the Commissioner of Buildings Department (Jabatan COB) to assist in the establishment and activation of JMBs and Management Corporations. Sixth, the site of the Penang Festival is owned by the State Financial Office. What is the plan to redevelop this site so that it is more competitive, along with rebranding the Penang Festival. Seventh, regarding human capital development apart from PSDC, Penang Science Cluster and Tech Dome, does the State Government intend to forge closer ties or cooperation with WCOE and Withdrop Campus, which also offer TVET courses in Batu Kawan. And finally, I would like to express thanks to the State Government of Penang, especially Batu Maung, because we have started the Bandar Cassia Mosque in early November. This mosque, I have fought for since 2019. Finally, the final construction works have begun. My question here is, in the development expenditure chart in the 2024 Budget, the Religious Department, the Islamic Religious Affairs Department is allocated 210,480,000. Does this allocation cover minor upgrading projects for existing surau and mosques. This is important because most Mosque and Surau Committees constantly bring this problem to the State Assemblymen of their areas to allocate upgrading funds. PKN is well aware that the allocation to State Assemblymen is indeed small and cannot enable us to implement these upgrading projects. Therefore, perhaps this task or responsibility should be specifically assigned under the Batu Maung Portfolio. And in conclusion, I once again wish to express a thousand thanks to the State Government and all heads of departments for always providing assistance and support throughout my performance of my responsibilities as the people's representative for Bukit Tambun for the sixth year. That is all, thank you, I request to support.
Thank you, Honourable Member from Bukit Tambun. Honourable Members, the House is adjourned and we will reconvene at 2.00 p.m. later. Not enough time for you …
Just to add a little heat, it doesn't stop.. (interruption).
The House was adjourned at 12.15 p.m.
The House resumed at 2.00 p.m.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Honourable Members all, we continue to the debate session. KOMTAR, you are invited to speak.
Mr Speaker, Honourable Members, greetings, greetings from Penang2030, greetings from Malaysia Madani. The Honourable Chief Minister has tabled a budget deficit that is the largest in the history of the state of Penang, namely RM514.52 million. This is because there has been no increase in the state's annual revenue, yet state expenditure rises every year. In truth, managing a country or a state cannot be compared with managing a company. A budget deficit is sometimes necessary for the good or welfare of the people and the development of the state. The Honourable Chief Minister often repeats that most of the tax collection has been channelled to the Federal Government and not to the State Government, although the State of Penang is always said to be a developed state, (with permission) but a developed state is not equal to a rich state. Although the State of Penang is always in the top position, whether at number 1, 2 or 3 in Malaysia in paying taxes, it is very disappointing that the allocation to the State of Penang is not commensurate with the position achieved, namely at 1, 2, 3 from the bottom of the count. The reason always given by the previous Prime Ministers was that Penang is already developed, Penang is fine, Penang can stand on its own, and the Federal Government can focus on states that are less developed.
I was very glad when Datuk Seri Anwar Ibrahim was appointed as the 10th Prime Minister, and he has brought improvements to this kind of situation. Recently the Federal Government allocated as much as RM10 billion to implement the LRT project and another RM100 million for the Bayan Lepas International Airport Enlargement Project. However, these efforts are still not sufficient because Penang has long been neglected, especially in terms of allocations. Most of the infrastructure in Penang is still far behind when compared with other international cities. Therefore, KOMTAR hopes that the leadership of the State Government can continue to strive to obtain a larger allocation from the Federal Government.
Mr Speaker, here KOMTAR would like to take Xiamen in China as an example. This year marks the 30th anniversary of the George Town and Xiamen sister-city relationship, which was established since 1993. This relationship is reflected not only in exchanges and cooperation in fields such as culture, economy and education, but also has unique similarities, especially in the aspect of arts.
The Honourable Chief Minister also led the delegation of the Penang State Government's Working Visit to Xiamen, China in September last. If we look back 30 years ago, the leadership of Xiamen at that time sent a delegation to Penang to learn from us, but after 30 years, if Honourable Members in this august House can make time to visit Xiamen, you will surely be amazed and impressed by its very rapid and modern development. Now it is we who must make a visit to learn from Xiamen.
What is the secret behind Xiamen's such rapid development? Xiamen was recognised by the People's Republic of China as a Special Economic Zone, among the first four, in 1980. The Chinese Government gave primary focus to developing Xiamen. The Chinese Government also channelled adequate contributions to Xiamen to ensure that the development of Xiamen was given priority.
Rapid development not only benefits Xiamen but also helps in developing surrounding areas, providing employment opportunities to residents in nearby cities. To my knowledge, Xiamen had a small original population, about 500 thousand people only in 1980, and the current population has risen sharply and reached as high as 4.3 million people.
Mr Speaker, returning from Xiamen to Penang, KOMTAR hopes that the Federal Government can change the existing perception of Penang. In fact, if Penang is not neglected and is instead given full attention, Penang will achieve a higher level of progress and be able to compete on the world stage with other international cities.
The more Penang becomes developed, the more assistance Penang can extend to neighbouring states such as Kedah, North Perak, Perlis and Kelantan so that they can develop together. The Federal Government needs to discard such thinking, namely that a developed state does not need support from the Centre compared with other states. The Federal Government must give full support and continue to develop the State of Penang, and not shift that responsibility to the State Government or the private sector.
Mr Speaker, first of all I would like to record my appreciation to the Federal Government for keeping its promise to approve the Penang International Airport (PIA) Enlargement and Upgrading Project. The cost of this project will be financed by Malaysia Airport Holdings Berhad (MAHB) and it is scheduled to begin work in September 2024 and is estimated to take 48 months to complete. Since the airport is the main gateway for foreign tourists entering Penang, we must ensure that the first impression we give to tourists is positive. In 2019, PIA received as many as 8.3 million passengers a year, more than its original capacity of 6.5 million passengers a year. If not for the two-year pandemic, I believe this figure would be even higher. Therefore I would like to urge MAHB to carry out this upgrading work as quickly as possible. Moreover, there is good news from the Honourable Datuk Seri Anwar Ibrahim, who announced a 30-day visa exemption for tourists from China, India and East Asian countries.
Mr Speaker, entertainment duty is one of the sources of income for the State of Penang. Before the pandemic, the State Government collected entertainment duty of RM14.2 million in 2019. In 2021, due to the impact of the pandemic, entertainment duty collection experienced a serious decline and we could only collect entertainment duty of RM800 thousand. This was also because the State Government had exempted entertainment duty to assist the tourism industry during that period. In 2022, the economic situation continued to improve and we succeeded in collecting entertainment duty of RM1.63 million. I hope that the State Government can implement and take efforts to encourage concerts, even though there are parties who want to stop concerts, film screenings, the establishment of theme parks and healthy entertainment activities in the State of Penang. These efforts can not only increase entertainment tax revenue but also boost the tourism and service industries. Indirectly it has a positive influence on other economies, such as further stimulating the hotel, restaurant, taxi and souvenir shop businesses and so on. The Honourable Prime Minister, during the tabling of Budget 2024, has announced that the 25% duty rate will be fully exempted for stage performances by local artistes. A reduction to 5% entertainment duty was also given for theme parks, family recreation centres, indoor game centres and simulators. The Federal Government will also implement a reduction to 10% entertainment duty for stage performances by international artistes and other entertainment events such as film screenings and sports and games events. I would like to propose that the State Government conduct a study and implement the duty rates proposed by the Federal Government as one of the efforts to encourage artistes to hold more entertainment activities or performances in the State of Penang. However, the State Government also needs to provide adequate facilities and infrastructure such as performance spaces or venues of international standard to meet this kind of need. Big concerts are usually held in Selangor. We must also learn from the Selangor State Government to develop Penang in the entertainment sector. Effective from 1 January 2022 until 31 December 2026, the Selangor State Government agreed to reduce the entertainment duty rate from 25% to 5% on every admission payment to theme parks in Selangor for five years. Throughout last year too, the Selangor State Government also provided a one-year entertainment duty exemption for ticketed admission to stage performances by local artistes.
Mr Speaker, the State of Penang is a unique state with a diverse population. According to statistics from the Department of Statistics Malaysia (DOSM), for 2022, 43% of Penang's residents are of Chinese ethnicity, while 10% of Penang's residents are of Indian ethnicity. The Non-Islamic Places of Worship (RIBI) site is a place of worship that must be provided by developers when they develop any residential area for use by local residents, as stated in the conditions of compliance for planning permission applications to the Local Authority. For developers who are unable to provide such a site, they are required to make a contribution to the RIBI Fund. The State Government will use the contributions in this fund to provide suitable sites and allocate contributions for repair and relocation works of places of worship. Since the RIBI Fund will be used to provide RIBI sites, I hope the State Government can actively look for suitable RIBI sites using the said fund. I also propose that pocket land owned by the government which is not used may be converted to RIBI sites if the land is suitable.
Mr Speaker, as the Member for the KOMTAR area, I have never missed an opportunity to raise KOMTAR issues in every sitting of the State Legislative Assembly (DUN). My wish for the rejuvenation of KOMTAR is always in my heart. The number of visitors coming to KOMTAR has increased after the Urban Transformation Centre (UTC) began operating at KOMTAR. Apart from the UTC project, the Penang Development Corporation (PDC) is also carrying out the project to upgrade KOMTAR Walk. This project has also received a warm response, to the extent that PDC had to provide two new units to accommodate the demand from traders who wish to open new shops at KOMTAR Walk. I have many times proposed to PDC that it appoint consultants to assist in the rebranding of KOMTAR and to determine a clearer direction for the rejuvenation of KOMTAR. Referring to the reply by the Honourable Chief Minister to my written question number 4, I am happy to share in this August House that PDC has accepted my proposal, and has held discussions with several property consultants for the purpose of rejuvenating KOMTAR and is now planning to appoint consultants to conduct a study on re-zoning at KOMTAR. This is to ensure that all promotional and leasing activities at KOMTAR are in line with the current situation and help in increasing visitors and planning the organisation of business activities and events there. PDC will call for quotations to appoint these consultants in the near future. I welcome this decision by PDC. And I hope the management of PDC will also involve me in the rejuvenation progress of KOMTAR, so that together we can develop and enable the glory of the KOMTAR building.
Mr Speaker, there is another issue in the KOMTAR area that I wish to raise in this honourable House. Last week, while debating the motion of thanks to the Yang Terutama Yang di-Pertua Negeri of Penang, I also touched on the matter of the KOMTAR bus station, where the problem of vagrants has been reduced. And I extend my congratulations to the responsible EXCO. Referring to the reply to my written question number 21, the State Government has upgraded the KOMTAR bus station this year with the cooperation of the Penang Island City Council (MBPP). MBPP has allocated RM37,800.00 for work to repaint the existing pillars, upgrade the lighting by changing HSPV-type lamps to LED-type, replace concrete seats with stainless steel seats and also allocate RM50,000.00 to upgrade the existing interlocking flooring. These are indeed good efforts. Unfortunately, the request that I have repeatedly raised, namely to build public toilets at the bus station, is still not accepted. In fact, the written reply I received said it is not in the plan. The KOMTAR bus station is one of the important transport hubs for Rapid Penang buses in Penang. The regular bus service hours start from 6.00 am until 11.45 pm at the latest. At that time, the KOMTAR building is already closed. So, how can passengers use the toilets? Let us not forget that Penang is one of the most developed states in Malaysia. If the most important transport hub in George Town does not even have a public toilet, how can we tell the public that we are an International-Standard City. I am not asking the authorities to build toilets of BMW standard as mentioned by the minister. I only ask that the relevant party or the responsible party may review and build a public toilet that can be used by the public at the KOMTAR bus station.
Mr Speaker, as a conclusion, once again KOMTAR would like to appeal to the Honourable Datuk Seri Anwar Ibrahim to grant a fixed grant of 20% of the tax revenue from the State of Penang that has been paid to the Federal Government. As an example, companies and the people of Penang have paid taxes of RM10 billion to the Federal Government, so the Federal Government should channel back RM2 billion to Penang. And this RM2 billion does not include the infrastructure and development allocations, and the allocations given every year. Let us all pray for the rather important news, namely the latest study by Petronas on the Langkasuka Basin, which shows the potential of hybokardon, hybo, hydrocarbons, existing in a deeper pre-formation that has not yet been tested. I hope we will receive positive developments. Then our state will obtain new revenue to carry out state development and safeguard the welfare of the people.
The state's progress reaches the peak of glory, its leaders are diligent in building the nation, rapidly developing, transformation succeeds, creating a name that reaches to the international level.
With this, I support the motion.
Thank you KOMTAR. I now invite the next speaker.
Thank you Dato’ Deputy Speaker.
Member for Berapit.
Ya.
Sila.
I extend greetings of peace and greetings of unity to the Honourable Deputy Speaker, the Honourable Members, and to the gentlemen and ladies who are with us in this House. I say, I extend my thanks for giving me the opportunity to take part in the debate on the 2024 Development Estimates which were successfully tabled by the Honourable Chief Minister. Dato’ Speaker, the first issue that I wish to touch on is also the concert economy. I welcome the proposal of the Honourable KOMTAR, who mentioned it earlier. But I would like to elaborate a little. After the pandemic is fading, it appears that foreign tourism is bringing a strong recovery. In fact it also has an effect on the growth of the concert economy. This year, many singers and music groups have performed at home and abroad. The well-known music group from the UK, Coldplay, has also just completed a concert at the Bukit Jalil National Stadium, Kuala Lumpur. According to one report, the recovery of concerts is a global trend at present, particularly seen as rapid this year, and bringing an astonishing economic effect. For example, the price of Coldplay concert tickets ranged from RM228.00 up to RM3,088.00, higher than the salaries of some people. Although the price is high, there are still many who queue for a long time to get tickets, along with side products. And there is also demand for hotels, F&B and so on. For example, Taylor Swift, the American singer who started her World Tour in March this year, and is expected to hold 131 concerts around the world. The economic impact in the USA alone has been estimated at as high as USD 5 billion, equivalent to RM2.34 billion. This figure is higher than the gross domestic product (KNDK) of many countries. Besides that, thank you. So, I will continue.
Teruskan, teruskan.
Besides that, to see Taylor's style, there is also a large group of people who use various ways to secure tickets. Bloomberg calls this big mosque "the swiftonomics effect". There has been a good response.
Sungai Acheh.
On this matter. In short, the economic benefits of the entertainment industry, especially concerts, are faster and more effective than those of the semiconductor industry, which requires investors with high investment over a longer period. Not every place has the potential to become an entertainment hub like this, as has been proposed by the Honourable Member for Komtar. It must be in a well-known city with facilities and public transport to hotels and so on. And for now, the Mega Concert, which drew more than 10,000 people, has only been held in Kuala Lumpur. But I believe that Penang is a state with great potential, because our state is not only well known in the world but also upholds freedom and equality and respects one another. According to the Penang State Budget Book 2024, the estimated cinema ticket tax collected was RM16,350,000,00. Meanwhile, the tax on entertainment show tickets and also the stage performance tax was only RM10,000.00. This shows there is still a big room for us to develop the concert industry. So, I call on the state to build an international-standard hall that can accommodate more than 10,000 people. Moreover, our state will build an LRT, so I propose that the Dewan Besar should connect, menyambung, with the LRT system to handle the large traffic impact. However, before the Dewan Besar is completed, let us not let this golden opportunity slip away to attract greater funds from the wave of concerts, which can provide incentives and also facilities support to international concerts. So, I hope the State Government can also study how we can benefit from the economic impact of these concerts. Today there is news from the Honourable Prime Minister that Chinese tourists will be eligible for a 30-day visa exemption to visit this country, starting next month. It is expected that this will increase the number of Chinese tourists and help the Malaysian tourism industry. Penang is a state that is favoured by Chinese tourists, because of the beauty of Penang, its culture, suitable weather, language and food.
In July this year, Public Invest Research stated in its report that the reopening of the China border witnessed an extraordinary entry of 178,000 Chinese tourists into Malaysia in the first quarter. And I am confident that with the tax exemption starting next month, even more will come into Malaysia. However, given the very encouraging trend of tourist arrivals and the recovery of tourism, how do we attract tourists from China to enter and stay for more days in Penang compared with other states? I would like to call for Penang to make preparations, including providing a more friendly, beautiful and clean environment for them, because many Chinese tourists have purchasing power, that is, purchasing power, who can stay longer in Penang. According to the newspaper Al-Ahram, which is a newspaper from Egypt, the country of Egypt. In Egypt, they not only launched special tourism packages for Chinese tourists. However, they optimised the experience and the travel of Chinese tourists to Egypt. Famous scenic places such as the Pyramids and other places. There are sound and light shows also equipped with Chinese language, enabling Chinese tourists to better understand the history and culture related to those beautiful places. And historical attractions explained in Chinese will increase the sense of participation and also the experience of tourists from China. And this will attract more Chinese tourists to visit those places. And Dato' Speaker, Deputy Dato' Speaker, I would also like to touch on the ESG challenges that we will face. The application of environmental, social and governance principles, that is ESG, has become a main factor in today's investment market. The term ESG was first introduced in 2004, in 2004, in a report titled "Who Cares, Win" by the United Nations, and this principle has been expanded and prioritised by the United Nations since 2020, and also includes the Sustainable Development Goals (SDGs) up to the latest year. The carbon border adjustment mechanism, that is CBAM, an agreement with the European Government to encourage the prevention of carbon leakage, will begin in 2026 and be fully implemented in stages by 2034. By 2025, the commission will assess the risk of carbon leakage for goods produced in European countries that are intended for export to non-European countries, and then this assessment will be applied across its supply chain, that is the supply chain. The State of Penang has more than 4,000 small and medium enterprises, that is SMEs, involved in products in the manufacturing sector, especially in the electronics and semiconductor sectors. Our SMEs will not be excluded from this supply network, which requires CBAM standards. Therefore, the Penang State Government should focus on providing a platform or one stop centre that can give clarity on the adoption of the ESG concept in their operations. I understand that the Penang Green Agenda, that is PGA, was launched in 2021 in line with the Penang 2030 mission. The Penang State Government is focusing on the green industry, and the Penang green industry programme, or known as the Penang Green Industry Programme, introduced by the Penang Green Council in 2022, aims to help the industrial sector, especially in the fields of electricity and electrical.
Honourable Member for Sungai Dua, pull out the battery, pull out the battery. If it still makes noise, pull out the battery.
Improving environmental performance and productivity. Through this programme, Penang is striving to become a green and sustainable industrial hub. Indeed, through the Green Industry Programme, activities and ESG capacity-building workshops have been organised among government, private sector, financial industry, MNCs, LLEs, LLCs, SMEs and so on, but it is still insufficient because CBAM will begin in 2026, leaving only 2 years for preparation. Therefore, I would like to propose that the state government provide an environmental, social and governance fund, that is an ESG fund, to help SMEs begin their ESG commitments. The Penang Green Industry Programme can be further enhanced and become a one stop ESG centre, that is an ESG hub, for all SMEs in Penang that need assistance in terms of funding or in applying the ESG concept. The green economy will become a main driver of global economic growth, and Penang can continue to lead in this field. Honourable Deputy Speaker of the State Legislative Assembly, the natural ecological education that can now be seen developing in Penang. Penang is a fortunate state, rich in natural resources, development, and places of natural ecological education. Government support for this has various importance for sustainable development and also the conservation of the environment. I welcome the proposal of the State Government to nominate the Paya Laut Forest Reserve Complex along the coast from Penaga to Teluk Ayer Tawar as a 'Flyway Shift Network' area. This migratory shorebird stopover site is the first in Peninsular Malaysia and the second in the country after Sarawak. The proposal to protect the Middle Bank area and also rebrand it as the Sanctuary Marine Middle Bank is a very good proposal. This Middle Bank not only has high marine biodiversity but also, because of its location, is close to the city centre of Penang. I also agree with the proposal from the Honourable Member for Bukit Tambun who earlier touched on this matter, but I see this proposal is good not only in terms of tourism economy, but I see both proposals are good for making a natural ecological education hub for all levels of society, especially students and families, whether through bird watching activities, or understanding seaweed and also various marine species. Both of these can also enhance awareness of environmental diversity, help individuals understand ecosystems and also the relationships between marine species or birds, flora and fauna in the ecosystem. Through the development of places for this natural ecological education, the government can play a major role in shaping a society that is more aware of the environment and also contribute to the aims of sustainable development, turning derelict buildings into creative economy spaces for the young generation. Honourable Deputy Speaker of the State Legislative Assembly, there are now Category 2 heritage buildings in the George Town World Heritage Site that require the attention of the State Government. According to a report from the newspaper Guang Ming Daily, four Category 2 heritage buildings on Campbell Street collapsed in September this year because they were not restored and were in a damaged condition. This situation not only poses danger to our residents but also gives a negative image to the George Town World Heritage Site. I understand that since the Heritage Centre of Excellence GTWHI was launched on 7 July last year, this centre has organised more than 350 consultation sessions, education briefing sessions and practical demonstration sessions for owners of community heritage buildings, local contractors and so on. This centre can be a model of good practice that can be applied to Category 2 heritage buildings based on the needs and conditions of the site and building, in accordance with the guidelines of the George Town Special Area Plan. Heritage buildings have high commercial value. I believe this centre can be developed to provide more information and awareness programmes related to cultural heritage for the community. Accordingly, I propose that the Penang State Government take over and restore potential derelict buildings found in the George Town UNESCO World Heritage Site, and also renovate them for use as an addition to the heritage centre of excellence. Restored buildings can be used as places for the public to learn and for research on cultural heritage to overcome existing problems, for example climate change, shortage of basic materials, termite problems. These buildings can also become a sandbox that provides benefits and support for the new generation, that is young people, to start their livelihoods in the creative economy based on the elements of our state's cultural heritage. Our state needs even more places for the creative economy, such as the Hin Bus Depot, which holds exhibitions every weekend, weekend, and the vacant buildings we already have can also be developed so that they become places not only for the young generation to sell creative goods, but at the same time also become a place for art exhibitions. For example, university students could have a place to hold exhibitions for the public. Here I would also like to touch on historical buildings outside the UNESCO George Town area. For example, the house of former Chief Minister Tan Sri Wong Pow Nee, located in Bukit Mertajam, has valuable heritage value but is not being taken care of. The house is near the Bukit Mertajam Public Market, and last year we welcomed good news, namely that the Ministry of Housing and Local Government announced that it would allocate RM23 million for the reconstruction of the Bukit Mertajam Public Market. The project involves the construction of 5 main components that will begin this year and be completed in 2026, and I believe this project will revive the image of Bukit Mertajam town. I hope the State Government will take this opportunity to revive the Bukit Mertajam town area, and not forget the house of former Chief Minister Tan Sri Wang Pow Nee, which is an icon of Bukit Mertajam town, and that it receives support from the Honourable Member for Padang Lalang.
Summarise, summarise, almost out of time.
This touches on empowering working mothers. Mothers who wish to return to the workplace face many challenges. However, I know that there will also be fathers who will let me know of the same problems, and I welcome this, especially those related to childcare. Providing affordable childcare services and flexible employment opportunities is very important. The Government can work with the private sector to provide childcare services and review the standards of registration for family childcare centres, with financial support, changes in guidelines and so on. Although there are currently guidelines for registering family childcare centres, the standards may not be encouraging, and I hope for a study to show that I can know a study has shown that women face the double burden syndrome, that is looking after children and also looking after elderly parents.
Burden, Honourable Member, burden.
Beban.
Not "beban" (burden), this "beban" is less clever.
Burden, sorry, the double burden, that is looking after children and also looking after elderly parents, especially childcare after childbirth. I am not sure whether the State Government will continue this year's initiative of providing an allocation of about RM800,000.00 a year to benefit 592 children in 124 childcare centres and kindergartens. I understand that although this scheme is not large, it encourages childcare operators and kindergartens and also childcare centres to provide their social services, and at the same time ensures an education, a pre-school, that is always reflected and guaranteed, and this effort should be expanded further. I hope it will encourage home carers to also register under this system, and also help parents who are less able financially, and at the same time also normalise pre-school standards. I would also like to touch on the status of the plan for the new building of the State Legislative Assembly that I debated in my speech last week. I ask the State Government to consider that we have this plan, which was mentioned several years ago, but I have not received any status or feedback until now. And finally, the State Government, unity is a hope for the people of Penang. We must empower the people of Penang in all aspects and continue to keep Penang leading. Accordingly, I respectfully request to support.
Thank you, Berapit. Please, Permatang Berangan.
Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. Praise be to Allah, Lord of the worlds, and may blessings and peace be upon the most noble of the prophets and messengers, our master and leader Muhammad, and upon his family and all his companions. Honourable Dato' Deputy Speaker, the Honourable Chief Minister of Penang, Deputy Chief Ministers, Members of the State Executive Council, Honourable Members, Heads of Departments, and ladies and gentlemen, all. First of all, Permatang Berangan would like to invite everyone to give thanks to Allah s.w.t. for all the blessings bestowed upon us. Thank you for giving Permatang Berangan the opportunity to debate the 2024 Budget tabled by the Chief Minister last Friday, which focuses on realising the Penang2030 Vision, a Smart and Green State Based on the National Inspiration Family, for shared prosperity. From the Budget, we find that the growth of Penang State's GDP in 2022 exceeded national GDP growth, at 13.1 per cent compared with 6.9 per cent in the previous year, amounting to RM112.1 billion. The manufacturing sector was the highest contributor to economic growth, at 15.9 per cent compared with 12.4 per cent the previous year, followed by the services sector, which showed encouraging growth of 11.3 per cent. Other sectors such as construction, agriculture, mining and quarrying also did likewise.
Dato' Deputy Speaker, Permatang Berangan is the second-highest DUN with many poor families after Penaga. Therefore, Permatang Berangan strongly supports that the Equitable Economic Agenda Assistance (BAES) be expanded and given emphasis. Efforts to help these poor families need to be enhanced so that the aspiration to eradicate poverty can be realised. As of October 2023, a total of 1,011 Poor Household Heads have been assisted, involving expenditure of RM3.7 million. Permatang Berangan believes that more Poor Household Heads need to be helped, and these efforts need to be continued and enhanced from time to time. What is the use of a state that is advanced and rapidly developing if its people are poor and many remain unprotected?
Dato' Deputy Speaker, the Honourable Chief Minister has stated that special consideration would be given to home buyer applicants who fail to obtain bank loans. The Penang State Housing Board has targeted 22,000 affordable housing units to be offered through the hire-purchase or rent-to-own (with permission) method, but unfortunately, so far only 4,191 affordable housing units have been identified under this method for offer to the people of Penang, which is about 19 per cent of the earlier target of 22,000 units. Therefore, Permatang Berangan very much hopes that the State Government can give special focus to achieving the set target.
Dato' Deputy Speaker, regarding rural development, Permatang Berangan proposes that the State Government give more attention to development in rural areas, especially development in the constituencies of North Seberang Perai, Central Seberang Perai and South Seberang Perai, which are rather lagging behind development in the Island area. Apart from that, the house-building programme, other than the new house-building programme and the repair of houses of poor people, which was increased from RM56,000.00 to a maximum value of RM75,000.00, as well as equipment assistance in every district totalling RM50,000.00 under the Economic Enhancement and Recovery Programme for poor small traders. Permatang Berangan very much hopes that the State Government can provide additional allocations for infrastructure such as roads, hawker stalls and economic activity centres for the community. This is needed so that infrastructure development, socio-economic development and human capital development in rural areas keep pace with the development taking place in urban areas.
Dato' Deputy Speaker, regarding environmental sustainability. Permatang Berangan supports and welcomes the Penang Green Agenda 2030. By practising sustainability in achieving sustainable development and preserving the environment, which contributes to the enhancement of sustainable economic growth. Therefore, the quality of life of the people needs to be improved in line with the State's economic growth. Permatang Berangan would like to suggest that the State Government rehabilitate the severely polluted rivers in Penang State, especially Sungai Kereh within my constituency, which has long been polluted. Pollution of this river has given a bad image to the Penang State Government and has caused the quality of life of the people to be affected and impaired. Firm action needs to be taken to resolve this pollution problem, starting from the source where the pollution occurs.
Dato' Deputy Speaker, Permatang Berangan very much supports the State Government's initiative to help ensure the nation's food supply is sufficient. Permatang Berangan believes that the large investment and considerable allocations that have been spent on the Development of Food Production Preservation Parks, or TKPM, at Ara Kuda, TKPM Mayfield, Taman Agro Batu Kawan and the Agro Park Agricultural Park in Permatang Pauh. Therefore, Permatang Berangan would like to propose that all the above projects be declared as Permanent Sites for agro-food production to ensure food security for the State of Penang. Likewise, the paddy field areas should also be preserved and prevented from any development in paddy field areas. Permatang Berangan also would like to propose that good agricultural practices be emphasised to guarantee that agricultural produce remains safe for consumption. The development of modern technology use also needs to be enhanced from time to time so that production output can be increased and so that we can minimise our dependence on foreign labour. The use of drones, for example, has successfully increased work efficiency in paddy fields.
Dato' Deputy Speaker, Permatang Berangan congratulates the State Government of Penang on its success in recording the highest average paddy production yield in the country for six consecutive years. Members of the House thumped the table.
That is from 2018 to 2023. Congratulations to all paddy farmers and staff of the Agricultural Agencies who were involved in charting this success. Permatang Berangan believes there is still room for us to further increase this paddy yield if the problems faced by farmers can be overcome and controlled as well as possible. The primary agricultural industry also needs to be given attention so that downstream industries can be developed and farmers can generate additional income from value-added activities, or with permission, value added, on the agricultural produce that is produced.
Dato' Deputy Speaker, the increase in the price of animal feed is very evident at present. Many livestock breeders have complained about the increase in the price of livestock feed, especially breeders who raise livestock using the feedlot system. Therefore, Permatang Berangan would like to suggest that the State Government look at this issue in depth and find alternatives to help breeders reduce their dependence on feed or pellets for livestock available on the market. It is greatly feared that if the cost of livestock feed continues to rise, many breeders will not be able to survive and this will affect the existing livestock industry.
Dato' Deputy Speaker, once again, congratulations to the State Government of Penang for succeeding in being the highest contributor to aquaculture production in the country. Furthermore, total revenue of RM1.8 billion was generated through the fisheries sector. Permatang Berangan supports all measures to help fishermen, such as obtaining assistance for nets and others. Fish-finding equipment assistance is also very beneficial and can help fishermen catch fish efficiently and effectively, if it can be considered. In addition, Permatang Berangan also proposes that assistance to river fishermen not be forgotten. Permatang Berangan has no sea and no coast, only rivers. Even those are severely polluted with pig waste. Fish cannot even live in this polluted Sungai Kereh. Finally, Dato' Deputy Speaker, there is some sad news that has just happened in the Permatang Berangan DUN at midday today, where a fire broke out involving the Ma'hadul Azhar Pokok Sena School, which caused part of the maahad building to be severely burnt, and the cause of the fire and the amount of loss have not yet been assessed. Therefore, I finally request to support this. Thank you, Wassalamualaikum warahmatullahi wabarakatuh.
Thank you, Permatang Berangan. The House records its sympathy for the incident at the Ma'hadul Azhar school in Permatang Berangan, and we hope the management can be patient and, God willing, we will help one another. And next, Batu Lancang. We alternate between the Government bloc and the Opposition bloc. Batu Lancang, you have the floor.
Thank you, Dato' Deputy Speaker. Thank you, Dato' Deputy Speaker of the Penang State Legislative Assembly. The Honourable Chief Minister of Penang, the Honourable members of the Penang State Executive Council, the Honourable State Assemblymen, heads and representatives of State Departments, friends from the media. Salam Harapan, salam 2030 and salam Madani. Honourable Dato' Deputy Speaker, I am happy to record my highest appreciation to this esteemed House for giving me the opportunity to debate the 2024 Penang State Budget speech delivered by the Chief Minister last Friday. Penang's economy grew 13.1 per cent in 2022 compared with 6.9 per cent the previous year, with a GDP value of RM112.1 billion. As usual, the manufacturing sector contributed the highest economic growth. Projected revenue for 2024 totals RM533.08 million compared with operating expenditure of RM1.1 billion, causing the 2024 Budget to record a deficit of RM514.53 million. Although the deficit in this Budget has increased by RM47.41 million compared with last year, I believe the State Government will strive and endeavour to boost the development of the state while ensuring the welfare of the people is always safeguarded. Penang also continues to remain on a strong footing, having succeeded in attracting new high-impact investments throughout last year despite global economic uncertainty. Therefore, the State Government is committed and serious in its efforts to pioneer new income generation through other sources in order to continue driving the comprehensive development of this state. The State Government is determined to continue the inspiration and vision of Visi Penang2030 towards realising Penang as a Smart and Green State Anchored on Family, an Inspiration for the Nation. Furthermore, it will ensure that Visi Penang2030 remains on the right track as an aspiration and an appreciation to 3,867 state civil servants. The State Government provides special financial aid (BKK) of half a month's pay or a minimum of RM1,000, paid in December, involving an allocation of RM6.1 million. A payment of RM300.00 will also be given to supervisors and teachers of Religious and Fardhu Ain Classes (KAFA), teachers of Rakyat Religious Primary Schools, teachers of Rakyat Religious Secondary Schools, as well as teachers and staff of Chinese Private Schools. At the same time, teachers of Tahfiz, Pondok teachers and teachers of the Penang State Islamic Kindergartens will likewise receive the same payment, involving additional expenditure of nearly RM1 million.
Honourable Dato' Deputy Speaker, it is exciting news for us all that Petronas has reportedly begun a new offshore multichain 2D seismic survey in the northern area of the Strait of Malacca, near the waters of Penang, Kedah and Perlis
to explore and map the hydrocarbon potential in open blocks PM 320 and PM301 of the Langkasuka Basin. The survey, which is currently being carried out, commenced in October 2023 and is expected to end at the end of December this year. The findings of this discovery will later be presented to the Penang State Government Executive Council, a study on the potential of high-quality oil and gas fields near the waters of Penang. This is certainly something exciting for us all. If the findings are positive, Penang will explore a new economic resource, namely oil and gas, a raw material source that can contribute billions of ringgit in revenue a year in the form of taxes to the State Government. Certainly, with this economic resource, it will help to drive and further advance the development of our nation. Sarawak, for example, is today known as the state that obtains the highest income in Malaysia, namely through oil and gas revenue reaching approximately RM4 billion a year. Therefore, if this mineral exploration becomes a reality, Penang's finances will most likely be secured, just like Sarawak's. As we can see, the deficit of the Penang State for this Budget is RM500 million, but if the state has an income source from oil and gas exploration, we will not be worried about such a deficit because it will help Penang just like Sarawak. Certainly, the Penang State Government will also use the income from oil and gas to develop new infrastructure and upgrade existing facilities in Penang. The people of this state will also be assured of a future to live here and enjoy economic prosperity. Honourable Dato' Deputy Speaker, I take this opportunity to raise the issue of cases of nuisance and disturbance caused by those who display symptoms of being mentally unwell. Often, when we receive public complaints regarding the behaviour of these individuals, there is indeed confusion over the SOPs on how to handle such cases. For example, when the police are contacted, the recurring issue is that the individuals suspected of being mentally unwell have not committed any act that violates the law, but their behaviour is simply not quite appropriate in the context of our society. In addition, when the police act after receiving a complaint by sending psychiatric health personnel, these mentally unwell individuals will reappear a few days later and cause nuisance and disturbance. There are several issues in handling these cases, where some of the individuals suspected of being mentally unwell do not have any valid identification documents, making it difficult for the authorities to take action. Accordingly, I would like to seek clarity regarding this situation. What is the appropriate SOP for handling these cases? Can cooperation or understanding between the different agencies be coordinated to handle such complaints? This is because if mentally unwell persons are reported to the Social Welfare Department (Jabatan Kebajikan Masyarakat, JKM), they too do not take action. Instead, they state that it falls under the responsibility of the police and the State Health Department. These problems cannot be resolved properly without a clear SOP. In the end, the problem will fall back on the community when mentally unwell persons do things such as scribbling on walls, sleeping on the five-foot way or outside shophouses, defecating or urinating everywhere, shouting and frightening people with sticks or knives, littering, causing disturbance on the roads, and many other such behaviours.
I move on to senior citizens and Persons with Disabilities (OKU). The Penang State Government has introduced the i-Sejahtera welfare programme since 2010 until now, including the Senior Citizens Appreciation Programme, the Single Mothers Programme, the Golden Wives Programme, Golden Children, OKU assistance, and taxi and school bus assistance. Throughout this period, up until June 2023, the total expenditure for payments under the i-Sejahtera Welfare Programme was RM400.29 million. In the 2024 Penang State Budget, grants and fixed charges remain the largest component, covering 59.43 per cent of the total operating expenditure of RM110.45 million for state welfare programmes, including i-Sejahtera. As the ADUN for Batu Lancang since 2018, my service centre has received a lot of feedback from residents. One of them concerns i-Sejahtera, the OKU assistance. I understand that this assistance falls under the purview of the Social Welfare Department, not the district office. As far as I know, the payment timing for the Senior Citizens Appreciation Programme and the OKU assistance is not the same. Recipients of the Senior Citizens Appreciation Programme usually receive money first and only then the OKU assistance comes. In fact, many OKU are over 60 years old. Recipients of OKU assistance have come to my office asking why all citizens, all the money from the Senior Citizens Appreciation Programme has been paid, but the OKU assistance money has still not been received even though they are already over 60 years old. I am of the view that there is a problem with this method of distribution because for the Single Mothers Assistance and the Golden Wives Assistance, when they reach the age of 60 they will be automatically transferred to the Senior Citizens Appreciation Programme, but the OKU assistance does not use such a method. To overcome this problem, I propose that the JKM work together with the district office to automatically convert the OKU assistance receipt programme to the Senior Citizens Appreciation Programme when they reach the age of 60. This can reduce the injustice felt by senior citizens in this OKU assistance. Honourable Dato' Deputy Speaker, I now move on to the 2024 Budget questions. I have many questions to ask here, with your permission. Following the budget presentation last week, I have several enquiries regarding the 2024 Penang State Budget that require the following clarification.
The questions I will raise are arranged in sections. On page four (4) of this budget book and page 3, the summary of revenue estimates for 2024, code 81000, titled Return on Budget Allocation. It is stated here that for 2022 the amount was RM19,015,432.27 million, but in 2023 it dropped to RM13,123,166 million. Why did the 2024 estimate drop by as much as RM4,595,232 million compared with 2022 and 2004. The difference shown is RM14.4 million. My question is why the difference is so large. On page 4, code 61102, titled Land Tax First Year Income, the amount shown for 2022 is RM9,701,498 million but the estimate for 2024 is only RM240,000 million? Can a reason or justification be given as to why first-year land tax income has dropped so much? My next questions concern the following matters: Code 62000, titled Indirect Taxes; Code 62801, titled Cinema Ticket Tax; Code 62802, titled Theme Park Ticket Tax; Code 62803, titled Entertainment Show Ticket Tax.
The Honourable Chief Minister:
Explanation. I do not want to disturb Batu Lancang's speech, but actually I am disturbing too. What the Honourable Member said is not wrong, but the practice is that this matter should have been raised at the committee stage because it contains details. When it reaches the committee stage, this House is in committee, so the head one bla bla bla….. that is when the Honourable Member raises such issues. All the MPs this year have already reached the budget debate, but if it is not many I think it is all right, but do not go through the whole book.
Okay, Dato' Deputy Speaker, because I am not on that committee. It is indeed in the budget book. It is important, I have much to ask because there is confusion here. The difference is quite large, so if possible I ask to be given an explanation.
I now move on to what is more important. I raise something about a new tax that was never seen in 2022 and 2023; this tax did not exist at all. I ask why there is such a tax in 2024. Okay, I will summarise. I am very interested in the dividends, code 75020, titled Dividends from Share and Stock Investments. I am sure many ADUNs here, they too do not know what dividends and shares held by the Penang State Government are. I believe all ADUNs do not know either. Let me get clarification from the EXCO later, let us see who answers. I want to know from code 75202, titled Dividends from Share and Stock Investments, Estimate for 2024, RM8 million. My question is, what types of shares does the State Government own? Have the shares it holds ever suffered losses? Who are the advisers or committee that determine the sale and purchase of these shares? Are these shares bought or held permanently just for dividends? Please state the names, the purchase value at that time and the current value of the shares that the state government owns at this time.
I think we need to know from whom the advisers or committee come who will advise whether to buy or to hold forever to obtain dividends. That dividend of 8 million is quite high, so I want to know the value of those shares as well, how much. How big is the government's asset, how large is that investment.
I think many ADUNs want to ask these questions. It is all right, I can summarise, or you can give me the opportunity to ask several departments. I think of two departments, the Veterinary Department. I see that in the Veterinary Department on page 129, Veterinary Services, with code 6, titled Poultry Industry Farming, Estimated Expenditure for 2022 was 505 but for 2024 only 200. I want to ask why this expenditure has decreased. Do poultry, duck and goose farmers no longer need guidance from the Veterinary Department, or am I informed that food security has become a concern at national and global levels?
For the next one, code 15, titled Veterinary Head Office Complex, RM1 million for Estimated Expenditure for 2024. Please explain what this expenditure is. So, for page 132, P18, Agriculture Department, code 10, titled Industrial Development, Fruit Crop Industry, Estimated Expenditure for 2023 is RM500,000 while for expenditure in 2024 it is 850,000. My question is, I want to know what types of fruits are planted, where they are cultivated, and how much net income is obtained from the yield of these crops. Honourable Dato' Deputy Speaker, before I end my budget debate speech, I once again wish to extend my thousand thanks to all Members of this House who took part in this session of debate, and thus, thank you, and I respectfully move to support.
Thank you, Batu Lancang, and next we invite Telok Ayer Tawar.
In the name of Allah, the Most Gracious, the Most Merciful, and peace and the mercy and blessings of Allah be upon you, and greetings of peace. Dato’ Deputy Speaker and fellow Members of the Penang State Legislative Assembly. First of all, I would like to record my thanks for the space and opportunity given to me to take part in the debate on the Penang state budget for the year 2024. On this occasion, I would also like to congratulate the Most Honourable Chief Minister, on behalf of all the residents of the state constituency area and also of Telok Ayer Tawar, for tabling the 2024 Penang State Government Budget successfully the other day. Although we come from different parties, as a people's representative I will always support any effort by the government for the good of the citizens of Penang. Dato’ Deputy Speaker, the Speaker, as we are all well aware, last year Penang's GDP grew beyond the national GDP growth, and Penang also recorded GDP growth that surpassed other states throughout Malaysia. This matter is a source of pride for us all, and I welcome the State Government's efforts to continue ensuring that our state's economy keeps developing and advancing. However, this increase is largely due to the manufacturing sector, namely from 12.4 per cent in 2021 to 15.9 per cent in 2022. The reality is that this increase has not had a major impact on the daily lives of the people, especially the residents of Penang in rural areas such as the KADUN of Telok Air Tawar, Seberang Perai, Penang.
Dato’ Deputy Speaker, here I see room for improvement, especially in terms of the policies and policy approaches implemented by the State Government, to ensure balanced development in urban and rural areas. For example, the tourism sector has great potential to help develop a more balanced economic development, as we are all well aware that the number of international passengers arriving at the Penang International Airport (PIC) increased to 629,476 persons in the past year. Likewise, the record number of hotel guests from foreign tourists, which for this year has increased drastically, rose from 1.32 million persons in 2021 to 5.58 million persons in 2022.
We must remember that most of these tourists are from neighbouring and regional countries that are already familiar with our rural way of life. Why does the State Government not try to plan a tourism industry development strategy based on contemporary tourism concepts such as agro-tourism or community-based tourism, especially for rural areas on the other side of the island? This effort should be seen as a two-pronged strategy that can help the State Government achieve several targets. Firstly, when we give additional focus to creating more tourist attractions across rural areas more comprehensively, we will be able to help reduce traffic congestion on the island side. We here are all well aware of how severe the traffic congestion can be on the island, especially during school holidays or festivals, to the extent that a journey of only 10 kilometres can take up to one hour. For example, earlier this year, during the Chinese New Year holiday, about 2.4 million vehicles were estimated to enter Penang, while during Hari Raya Aidilfitri, some 3 million vehicles were estimated to enter Penang. We must remember that most of them are not merely coming to our state to celebrate the festivals, but also to take a holiday, so when more tourist focal points are created on the other side, more people will likely start shifting there and at the same time help reduce traffic congestion.
Secondly, from the economic perspective, the economic imbalance between residents on the island side and the mainland side remains significant. When we implement this strategy, I am confident that the economic spillover effects will also be felt in a more balanced way, especially by the people of Penang in rural areas. It is an important phenomenon in the tourism field that in 1984, Gitelson and Crompton were the first to recognise the importance of repeat visits and their contribution. They believed that coastal areas very much need multiple tourist visits to grow in order to fulfil this aspiration, and a diversity of activities must be implemented to make the atmosphere that tourists experience lively. Telok Air Tawar has taken a step by requesting that the coastal area of Pantai Bagan Ajam, near the fishermen's jetty, and Bagan Dalam be given emphasis for tourism industry development, which indirectly generates economic income for Penang. Tourism in the state, and indirectly, helps the economy of the people, the economy of the people that is connected. For example, we recently saw on social media a viral local young entrepreneurial venture called Laman Tok Mah, located in Kampung Pokok Tampang, Tasek Gelugor. The main concept of this venture is to offer coffee and classic menus in a traditional house setting. Not only that, Laman Tok Mah also offers a more comprehensive village life experience with special package offers such as cycling and enjoying the beauty of nature and paddy fields. The State Government, together with its agencies, should be able to make Laman Tok Mah one of the tourist attractions in the Seberang Perai area that offers tourists a comprehensive experience of the rural life of the Malay community. With initiatives like these, we can attract more tourists to Seberang Perai, which will indirectly help strengthen the local economy and indirectly reduce the economic development gap between urban and rural areas of Penang.
Thirdly, from the perspective of promoting local community culture, our state of Penang has a very unique population composition with multiple races, religions and cultures, which for foreign tourists, especially from Western countries, has now become a very big attraction factor. They not only want to learn, but also want to try to experience our way of life for themselves. On this matter, I think it is appropriate for the State Government to consider the proposal to create a special village area for the Malay community of Penang, such as Chew Jeti for the Chinese community and also Little India for the Indian community. The State Government may be able to list briefly several existing Malay village areas and possibly collaborate with the bumiputera development agency as well as PERDA and MARA to develop these areas as community-based tourism areas. With strategies like these, I am very confident that we can further strengthen the tourism sector as one of the major contributors to the state's GDP, while ensuring that the economic spillover generated truly reaches the people out there.
Dato’ Deputy Speaker, in this local area, I would also like to record my thanks to the Penang State Government, which has announced its intention to establish the Paya Laut Forest Reserve, stretching from the coastline of Penaga to the area of my own constituency, Telok Air Tawar, as a Flyway Site Network. The Flyway Site Network is a stopover site for migratory shorebirds under the East Asian Australasian Flyway forum. This will be the first in the Peninsular Malaysia and the second in the country after the Bako-Buntal Bay Flyway Site Network. Following the official establishment of this Flyway Site Network, it will become a new eco-tourism hub in Penang that is able to attract domestic and foreign tourism interest.
Dato’ Deputy Speaker, apart from focusing on the development of projects, I also believe we need to continue to strive to strengthen the existing tourist focal points, especially in rural areas around the Seberang Perai region, as a step to balance economic development at the state level, in line with the Penang2030 vision. For example, we can focus on efforts to strengthen the Hutan Pelajaran Air Itam, such as the Sungai Dua river cruise, tourism around Pantai Robina, and so on. This is important so that we can use the existing natural resources, which have already become tourist attractions, as best as possible for economic development. In this regard, I respectfully request that the State Government explain what strategies have been identified for implementation to achieve this goal, and how much allocation will be provided through the 2024 Budget to realise this agenda.
Dato’ Deputy Speaker, I see that the development efforts and the efforts to develop the tourism sector as one of the main pillars of our state's economy need to move in tandem with proper infrastructure development in order to attract more investors and consumers in general. This is especially important in the context of developing tourist attraction areas in rural areas, which still face significant infrastructure development issues. For example, tourist areas, especially in rural areas, still face the issue of connectivity, (with permission). I ask the State Government to explain what efforts will be implemented, especially in terms of infrastructure development, to strengthen this agenda. For example, can the State Government consider providing free bus facilities for tourists to travel to tourist attraction areas in these rural areas? Such measures will, of course, facilitate the movement of tourists and at the same time encourage more tourists, whether from within the state or from abroad, to choose these rural tourist attractions. Likewise, regarding the development of small and medium industries in rural areas that offer various forms of services and products that can promote Penang as a preferred destination for people to travel to. I welcome the State Government's announcement to continue supporting the development of small and medium industries (IKS) through InvestPenang and PDC. Among the initiatives identified as catalysts for this agenda is the establishment of the Market, Resource and Training Advisory Centre for IKS (SMART) under InvestPenang, which functions as a one-stop centre. Since its establishment in 2010, through advisory services, advertising and investment support for IKS development, SMART has provided advisory services to more than 2,600 entrepreneurs and companies. Meanwhile, more than 610 local companies have been successfully registered under the online category of InvestPenang. For marketing and seeking investment purposes, I see that these two initiatives serve as a support system, (with permission), in efforts to achieve this target. However, they need to be strengthened further so that these initiatives can provide better and greater opportunities to all small and medium entrepreneurs in the State of Penang. This means that the implementing agencies of these policies need to go down to the ground and move more actively, especially in rural areas, to identify more IKS entrepreneurs so that they can also be helped more comprehensively to develop their businesses, in line with the strategy to develop the tourism industry in rural areas. Thus, IKS entrepreneurs in rural areas, especially around the Seberang Perai region, will also receive more direct benefits so that they too can play a role as major stakeholders in the state's economic development through the tourism industry. In this regard, Dato’ Deputy Speaker, I respectfully request that the State Government provide additional allocations to the agencies or institutions named with this responsibility so that they can move more actively in achieving this target.
Through this initiative, the Penang State Government has also succeeded in developing the Penang IKS Centre in the Bayan Lepas Industrial Area to help new and existing entrepreneurs in Penang reduce their operating costs by providing operating space, meeting room facilities, pantry rooms, cargo lifts, utility areas, security guards and surveillance cameras at subsidised rental rates. I hope that a centre of this kind will also be developed in the Seberang Perai area so that small and medium entrepreneurs from that side can also enjoy initiatives like this. Although the cost of operating in the Seberang side is much lower compared to the island side, of course, with more IKS centres like this, the State Government can help strengthen the IKS sector in the State of Penang more comprehensively.
Dato’ Deputy Speaker, I see the 2024 Budget tabled by the Most Honourable Chief Minister the other day as an action plan with great potential. Even so, I am of the view that too much focus is being given to aspects of developing new economic sectors, to the extent that the development of existing economic sectors, especially in rural areas, seems to be neglected. Although Penang is becoming more rapidly developed by the day, we cannot at all focus only on urban areas. We also need to give proper attention to the development of rural areas so that we can achieve balanced development goals more actively. Therefore, Dato’ Deputy Speaker, I respectfully request that the proposals I have put forward be given proper attention and consideration by the State Government. I beg to support. That is all, thank you.
Thank you, Telok Ayer Tawar. Next, the Honourable Member for Air Itam is invited to speak.
Thank you, Deputy Speaker. Honourable Tuan Chow Kon Yeow, Chief Minister of Penang. Honourable Members of the State Executive Council, Honourable Members of the State Legislative Assembly, heads of department, media friends, and distinguished ladies and gentlemen. Greetings of peace, greetings of Penang2030, greetings of Malaysia Madani. Thank you, Dato' Deputy Speaker, for giving me the opportunity to take part in the debate on the 2024 budget in this esteemed House. Congratulations to the Honourable Chief Minister on the tabling of the budget last week. Here I wish to raise several matters concerning this budget for everyone's attention. The first matter in this debate is the macro issue of the budget. The ringgit's position is now weak and unpredictable. On 24 January this year, the exchange rate of the ringgit to the USD was RM4.24, and on 27 October the exchange rate of the ringgit to the USD was RM4.77. Within these 10 months, the value of the ringgit has fallen by 50 sen against the USD. This is equivalent to a depreciation of 11.7%. The national inflation rate is now hovering between 1.9% and 2% in the fourth quarter. Air Itam believes that the department began preparing the 2024 Budget as early as the second quarter of this year. At that time the value of the ringgit was still strong, but now the ringgit is weakening further. Raw materials, equipment and others will certainly rise in price. This means that the department's actual procurement next year will be at least 10% more expensive. To the departments listed in this budget, under these circumstances, what steps will be taken to ensure that expenditure and procurement meet their targets despite the rising prices of goods next year? I understand this is beyond expectation. Will the quality, (with permission), the quality of goods to be purchased decline, decline or will the number of procurements be reduced because the amount of money approved is no longer sufficient due to the weakness of the ringgit and inflation? Air Itam is confident that this core issue will be faced by all government departments and agencies, so here I ask the departments and agencies in this House to put forward methods of resolution during the winding-up session.
Dato' Deputy Speaker, the second matter is food security. This is a basic issue of people's livelihood. Air Itam notes that the State Government also takes this matter very seriously. Referring to the budget book, second volume, page 118, under the major heading, Development Estimates 2024, the Department of Veterinary Services (JPV) is allocated only RM4.6 million, equivalent to 1.2% of the overall total. The Department of Agriculture is allocated RM6.9 million, equivalent to 1.8% of the overall total. The cumulative percentage is only 3%. This is a very small figure to bear such a gigantic responsibility. This is not balanced. For the information of the House, although the self-sufficiency ratio (SSR), (with permission), for chicken eggs, ducks and meat has achieved its target, congratulations to JPV. However, the department still needs to carry out continuous disease monitoring and control work so that the SSR can be maintained. Adequate allocation is important to ensure that the goals of the National Food Security Policy 2025 in Penang are achieved, and the percentage distribution of funds must reflect our seriousness in tackling this fundamental issue. Dato' Deputy Speaker, at the same time, the high-value plantation sector that can generate revenue for the government also needs attention. I wish to record congratulations to JPV for the success in increasing the production of swiftlet nests by 1.14 tonnes, from 7.79 tonnes in 2020 to 8.93 tonnes, equivalent to 14%. I hope JPV can target an increase in net EBN up to 20 tonnes by 2025, which is equivalent to the value of finished goods of RM168 million. I would like to recommend an approach of skills enhancement, (with permission) upscaling, effective marketing and the application of technology to achieve this goal. I request that the department provide comments during the winding-up as well. For the third matter in the debate, I extend congratulations to the State Government on the opening of the first Homeless Transit Centre in Penang. I would like to draw the attention of the State Government also to the problem of vagrants, namely beggars, vagabonds and the destitute in the State Assembly seat of Air Itam. Air Itam is now a focal point for many tourists who visit famous places such as Bukit Bendera, Kek Lok Si Temple and also the Michelin-listed hawkers and others. Therefore, Air Itam has unintentionally become a haven for vagrants. They come from outside the area to take the opportunity to beg for donations from foreign tourists. Incidents like this give a negative impression to visitors and guests from abroad as well as locals. This hurts the good image of Penang in the eyes of our guests. The activities of people, destitute persons, peleser and the mentally unwell who cause unease to members of the public visiting the place and create disturbance. Air Itam requests that relevant agencies, among them the JKM, MBPP, PDRM, RELA, the National Anti-Drugs Agency, the Health Office and others, frequently carry out integrated joint rescue operations, as these departments have been given powers under the Destitute Persons Act 1977, which replaced the Vagrants Act 1965, and section 27(C) of the Minor Offences Act 1955. The JKM has been allocated RM11.3 million next year, with fixed grants and charges amounting to RM8 million. I note that this is RM200,000 less than in 2023, but I request that with the approval of this budget, the JKM will take immediate action and make use of the new Homeless Transit Centre to resolve the problems I have raised.
Dato' Deputy Speaker, the fourth matter concerns the development of tourism in Air Itam. As is known, the State Assembly seat of Air Itam is increasingly famous on the world map with the latest Michelin award for duck rice at the Air Itam Market stall. At present Air Itam has 7 well-known attractions, namely firstly Bukit Bendera, secondly the UNESCO Biosphere Forest Reserve, thirdly the Air Itam Dam, fourthly the War Memorial, the curry mee on the bridge, Kek Lok Si Temple, Nasi Kandar Kampung Melayu and the laksa at Air Itam Market. If in the world there are 7 famous tourist attractions named The 7 Wonders of the World, I wish to brand the 7 tourist places of Air Itam as The 7 Tourism Wonders of Air Itam (with permission). There are many more attractions with potential to be developed as tourist places, and here I wish to propose one Air Itam tourism cycling circuit. For the information of the House, this 21 km circuit starts from Air Itam Market, passes along the route of Kek Lok Si Temple to the Air Itam Dam and Bukit Bendera, and also passes through the route in the State Assembly seat of Air Putih. The Air Itam tourism cycling circuit can be developed in the manner of the famous Shimanami Kaido cycling route in Japan. Previously, AED installation was carried out along the cycling route from Air Itam Market to the Air Itam Dam. I request that the State Government, under the Health EXCO, add AEDs in the route areas not yet covered. The installation of street lights for areas that are poorly lit and the installation of emergency telephones for areas without mobile phone coverage will make these areas safer and suitable to be developed as tourist places. Air Itam requests that the State Government intensify the promotion of Air Itam tourism, and I welcome the use of The 7 Tourism Wonders of Air Itam (with permission) as a new and creative branding for that purpose. Air Itam requests that dialogue be held with residents, agencies and the State Assembly office on this matter, and that sufficient funds be channelled to make this aspiration a success. This effort can bring more tourists to Air Itam and directly create more employment opportunities and businesses.
Dato' Deputy Speaker, for the final matter, which refers to education: in 2022 a total of RM4.18 million was channelled to mission schools and national-type schools by the State Government. This year, RM2.39 million is channelled by the State Government to Tamil schools. In the budget tabling last Friday by the Honourable Chief Minister, the allocation to be channelled to these schools was not specifically stated in detail by category. Since 2008 the State Government has allocated a sum of money to help these schools, but this year no announcement was made during the budget tabling. Therefore, as I have stressed earlier under point one, I request that the Finance Department provide detailed information under the heading of grants and fixed charges. I request that the State Government provide information on the distribution of that allocation, if any remains. Dato' Deputy Speaker, allow me to conclude with a pantun:
Pulau Pinang, a sovereign state, its history recorded for hundreds of years; its people are diligent and spirited, its citizens brave, loyal and obedient.
Therefore, I hereby support the speech on the Supply Enactment 2024 Bill and the 2024 Development Estimates Motion, Second Meeting of the First Session of the Fifteenth State Legislative Assembly of Penang. Thank you, Dato' Deputy Speaker.
Thank you, Air Itam, and I invite the Member for Pengkalan Kota. Please.
Thank you, Dato' Deputy Speaker. Thank you once again for allowing me the opportunity to take part in the debate on the Supply Bill and the Development Estimates Motion, namely the Penang State Budget for 2024, which was tabled last Friday by the Honourable Chief Minister. Dato' Deputy Speaker and Honourable Members, George Town has been recognised as a UNESCO World Heritage Site since 2008. The people of the State of Penang are very grateful and proud of this recognition, because this status has stimulated our state's economy, especially the services and tourism sectors. Tourists, whether from within the country or abroad, visit the State of Penang and the city of George Town to see (with permission) the streetscape of this World Heritage Site. I welcome the implementation of the visa exemption policy by the People's Republic of China, under which holders of ordinary passports who are our citizens no longer need to apply for a visa to visit China, starting from 1 December 2023 for a period of one year. At the same time, citizens of China are also allowed to visit our country for 30 days without a visa. This is good news that can stimulate our tourism sector, particularly our state, which is inclusive and well known for its culture, food and World Heritage Sites. I am confident that the Honourable Member for Paya Terubong will certainly have plans and strategies to make the State of Penang the first choice for tourists from China in their travel itineraries, because our state has several direct flights to China. Our state has Category 1 and Category 2 heritage buildings that are very valuable and historical. However, there are heritage buildings in the city of George Town that have been neglected and become dilapidated. Since 2018 until now, there are as many as 88 dilapidated buildings and 92 buildings in unsatisfactory condition in the George Town area. I thank the Penang Island City Council (Majlis Bandaraya Pulau Pinang, MBPP), which has taken the initiative to help repair dilapidated buildings for the safety of the public and also to preserve these valuable Category 2 buildings. In fact, apart from owners who are overseas or who cannot be traced, most owners and occupants at the George Town World Heritage Site face constraints in maintaining these Category 2 buildings. This is because the cost of maintaining these Category 2 buildings is very high and requires compliance with the heritage building guidelines, including the use of original raw materials for repairs to walls or roofs.
Compliance with these conditions has caused maintenance costs to be higher than for ordinary buildings. Therefore, many owners feel it is not worthwhile or are unable to maintain heritage buildings, and simply leave their buildings in unsatisfactory and unsafe condition. Generally, these approval applications take months to obtain approval at each technical level. This bureaucratic system not only delays the approval application process, but also increases professional fees and burdens every applicant. This has resulted in many reported cases where works were carried out without permits and without approval on heritage buildings. For a long-term plan to ensure that the status of the George Town UNESCO World Heritage Site is preserved, the Penang Island City Council has introduced various types of development guidelines that can encourage the conservation of existing heritage buildings or the development of in-fill land (with permission). With what the Honourable Chief Minister has tabled in the 2024 budget, I warmly welcome the State Government of Penang's plan to allocate RM25 million for the conservation and management of the George Town UNESCO World Heritage Site, in order to strengthen the outstanding universal value of the World Heritage Site. In fact, this was also one of the written questions I submitted to the State Government, and I thank the Honourable Chief Minister and the State Government for sending a very clear message to industry players, including UNESCO, that the State Government of Penang supports and upholds the conservation of the World Heritage Site. I fully agree with the State Government of Penang's intention to help owners of heritage buildings who wish to maintain their heritage buildings. With the government initiative provided, I am confident that many owners of heritage buildings who have plans to restore their heritage buildings that are in unsatisfactory condition will welcome the State Government's initiative if the proposed incentives can be realised. The State Government can also consider simplifying the approval application process for repair and conservation of heritage buildings, including simplifying complicated bureaucracy so that conservation works on heritage buildings can begin within a short time. A whitewashing moratorium programme can also be considered to whitewash works that have been carried out without approval on heritage buildings, if these heritage building owners are willing to come forward and meet the conditions set by the authorities.
Dato' Deputy Speaker, regarding the government's efforts to strengthen the outstanding universal value of the World Heritage Site, I humbly inform this Honourable House that the conservation work on the Klan Jetties at Pengkalan Weld has already been carried out, on the initiative and efforts of the Members of Parliament and State Assembly representatives of the area, with the cooperation of government agencies such as the District Land Office (Pejabat Daerah Tanah) and the Forestry Department (Jabatan Perhutanan). The jetty boards at Pengkalan Weld have suffered material fatigue, also known as "Material Fatigue" (with permission), over time because they are used by local residents, whether walking, cycling or riding motorcycles. After our state received the recognition of UNESCO World Heritage Site status, the Klan Jetties at Pengkalan Weld also became a focal point for tourists. This situation has caused the lifespan of the jetty boards to be shortened due to overloading (with permission), and roughly every 4 or 5 years, a jetty must have its boards replaced based on previous records. In the previous term, through the efforts of the Pakatan Harapan representatives, namely the former Honourable Member for Pengkalan Kota and the former Honourable Member for Tanjong (who is now the Honourable Padang Kota), the jetty boards at Lee Jetty, Tan Jetty, Ong Jetty and Yeoh Jetty were maintained and replaced. For this term, we have two more Klan Jetties, namely Chew Jetty and Lim Jetty, where the work of replacing their respective jetty boards is ongoing. I record my appreciation and thank the Honourable Member for Tanjong for the contribution of an allocation totalling RM400,000 to finance these works for the safety and comfort of local residents and tourists as well. At the same time, Pengkalan Kota itself has already received further requests to help residents at Tan Jetty and Lee Jetty return to Tan Jetty and Lee Jetty again for the same maintenance work, because the lifespan of the jetty boards replaced in the previous term has become a five-year cycle. I mention the examples above to inform Honourable Members that we, as representatives of the people, and as the State Government of Penang, always play a role in supporting the people of the State of Penang, including maintaining the properties of the World Heritage Site. Even today, we can still see evidence that the Honourable Padang Kota funded allocations to install electric poles at the Klan Jetties as well. Therefore, I am honoured by the announcement in the 2024 budget and hope that this will be realised next year.
Dato' Deputy Speaker, I am interested in the State Government's efforts to upgrade the five-foot ways in the UNESCO World Heritage Site of George Town under the RM25 million allocation by the Federal Government. I mentioned last week in this Honourable House that the heights of five-foot ways in our city are not uniform, and I am grateful that the State Government also takes care of the problem of five-foot ways that have large areas to be upgraded. I would be honoured if my suggestion raised in the debate, to build road ramps between premises that have different five-foot way heights, could be considered. I am also pleased with the announcement of the RM10 billion allocation by the Federal Government for the LRT Project. The implementation of this will certainly benefit residents of Pengkalan Kota and ease traffic between Bayan Lepas, George Town, Tanjung Bungah and Seberang. I am well aware that the long-vacant development site of KOMTAR Phase 5 is intended to make way for a station or terminal to be developed under the LRT Project. There are more than 20 dilapidated Category 2 buildings that have been vacant for years on the KOMTAR Phase 5 site. I am of the view that if these buildings have heritage value and will not be demolished or relocated to another location, the State Government can consider repairing these buildings for community purposes immediately, without waiting for the LRT Project that will be implemented within the next few years. Both the LRT Project and the repair of the dilapidated Category 2 buildings can be carried out simultaneously so that the people can benefit earlier from the use of these Category 2 buildings. I recommend that the State Government of Penang establish a RIBI site on the KOMTAR Phase 5 development site, because there is high demand for RIBI sites in the George Town area, North East District.
Dato' Deputy Speaker. On 23 February 2023, our state received a fund totalling US Dollar 10 million from the United Nations for the purpose of financing the Climate Change Adaptation Programme, under the project name (with permission) Nature Based Climate Adaptation Program for the Urban Areas of Penang Island (NBCAP). I record my heartfelt congratulations to the State Government of Penang for being selected by the United Nations among competition from countries, among competition from other developing countries at the international level. I am confident that the State Government, through the relevant agencies, will use these funds to further green the natural environment and give more focus to social resilience in line with the Penang2030 Vision. I am interested in the data provided by the Honourable Member for Perai through the reply to one of my written questions, where a sum of US Dollar 3.175 million will be used to reduce the effects of the Urban Heat Island in Bandar George Town and Bayan Lepas. As one of the State Assembly Members for the George Town area, Pengkalan Kota welcomes this project to plant trees and create more pocket parks with a micro-climate orientation. Pocket parks have been widely introduced by the Penang State Government over the past 15 years, which are importantly welcomed by the people and communities in their respective areas. I support the concept of turning open land into pocket parks with a micro-climate orientation, and at the same time creating more recreational places for the people of the State of Penang. If we look at the existing Armenian Park, many have brought their family members to visit Armenian Park in the evenings and at night. But at the same time, there are staff working in offices near the park who bring food to the park to eat lunch during their break. Among them, one group comprises staff from Georgetown World Heritage Incorporated. I think this is a good trend, and we should introduce it to the public so that others will follow, and the State Government's efforts under this Greening Agenda will not be wasted. Part of the allocation from this project will be used to plant trees along roads that will complement existing trees to introduce shade trees at car parks. This is a good proposal, where trees and plants can help reduce the heat of the environment and provide shade to overcome the hot weather that we face in our state. Only that, in terms of planning, it needs to be refined before planting, before they are planted. Based on experience, trees planted either by the Local Authority or by individuals often cause nuisance to residents and the environment. Dry leaves, twigs and branches falling over time have destroyed buildings and cars, and some have even caused injuries to members of the public. Large roots also damage drains, road surfaces and walkways. These are the problems and constraints faced by our city. The types of trees planted by some developers are also unsuitable and do not contribute much in terms of greening and shade for our society. When I touch on this point, I would like to record my appreciation to MBPP, which works hard to ensure that trees on the island side are maintained well and often responds efficiently after receiving complaints from the public. If I am allowed to comment, state land that is not under the supervision of MBPP, such as land of the State Government, District Offices, CMI, PDC, JPS and so on, cannot be properly managed by MBPP directly. And this has caused public nuisance that cannot be handled because of trees and plants. So I request that careful planning be prepared on which types of trees are suitable to be planted in a particular area. And whether the capacity and skills of the Local Authority can cope with the high demand in terms of maintenance work for trees from 5 to 20 years after the saplings are planted for the time being. Based on the information provided, a total of US Dollar 2.725 million has been channelled for the stormwater drainage and flood management project. I sincerely request and plead that part of this allocation can be channelled to overcome the recurring flood problem in Pengkalan Kota caused by high tides, which stem from global warming. The high-density local residents will certainly be grateful and welcome the efforts of the State Government of Penang, which is caring towards these people.
Dato' Deputy Speaker. I was very shocked when I received feedback that the Penang Development Corporation (Perbadanan Pembangunan Pulau Pinang, PDC) has no record of upgrading or resurfacing work on the roads in their highway areas and also the Pengkalan Weld Bypass. Ten years ago, this area was built by PDC. The roads around the Pengkalan Weld Bypass have not been handed over to MBPP. Therefore, MBPP has no right to carry out any upgrading work in that area when requests are submitted to them. PDC has many development and housing projects from the past until now. The State Assemblyman of Pengkalan Kota has 2 landed housing schemes developed by PDC: one at Cecil Bypass and the other at Pengkalan Bypass. Because the roads in housing areas developed by PDC have not been handed over to MBPP, those roads cannot be upgraded, at least within this 10-year period. I sincerely request the goodwill of PDC to give special consideration, given that residents in these areas are among the earliest groups to occupy PDC-developed houses decades ago until today. I hope PDC can take the initiative to resurface its roads, which are now in poor condition, for the safety of the public, and to upgrade the drainage system in the surrounding area so that water runoff functions properly and does not become a breeding ground for mosquitoes and other pest insects. State welfare programmes such as the i-Sejahtera programme have cost RM110.45 million every year. Although this amount is large, the State Government of Penang, which is always caring towards the people, continues to channel this budget to ensure the welfare of the common people is preserved. In one of my questions, my written question on the Single Father Gratuity Programme. I was given an answer, I was given an answer that the State Government currently has no further plans to expand i-Sejahtera assistance to cover the single father category. Single fathers play an important role with a great responsibility to bear the burden. Not a burden. The burden of the family on their own shoulders. Although a single father is male, he is also a highly respected figure. The State Government of Penang practises a gender inclusiveness policy that prioritises balance and gender equality. I urge that the single father category should be included in the i-Sejahtera programme if the state's financial position permits, because single fathers are no different from single mothers in terms of their role in raising their respective children. This can show that the State Government practises these principles and also gives meaningful recognition to this group of single fathers.
Dato' Deputy Speaker and Honourable Members, as stated in the Budget Speech by the Honourable Padang Kota, our state does not have sufficient sources to generate state revenue. The budget for next year is also reported to be in deficit. However, at the same time, our beloved state has the leadership of the Unity Government, which administers and manages the government well, with integrity and also with prudence. Based on this year's trend, expenditure has actually been well below the budget, with RM280.27 million saved in operating expenditure as of 15 November 2023. Therefore, I am very confident and hopeful that with the leadership team of the Penang State Government, our beloved state will continue to progress and prosper. Let us not forget the suggestion of the Honourable Member, and let us together pray that these hydrocarbon resources and rare earth elements can be discovered and explored one day, in a safe manner and, most importantly, without compromising the existing natural environment. May the State of Penang always be blessed. With this, I humbly move to support. Thank you.
Thank you, Pengkalan Kota. Next, I invite Machang Bubuk. Please proceed.
Thank you, Dato' Speaker. Salam sejahtera, Salam Penang2030, Salam Malaysia Madani. First, I would like to thank Dato' Speaker for giving me the opportunity to debate this Budget 2024. Congratulations and well done to the Chief Minister, who tabled a Budget 2024 that is so comprehensive and takes into account what is best for the State of Penang in moving towards Penang2030. Dato' Speaker, the future of the State of Penang will be determined by two matters. The first is whether Penang can sustain the core advantages in geopolitical and geostrategic competition. The second is how we can build resilience, whether we can address the challenges of climax change, health, food security and also sustainable economic development. So, if we can address these two matters well, then we can move towards a brighter future for the State of Penang. Therefore, I feel that the State of Penang needs to invest in the future of our state. So, to invest in the future of our state, the infrastructure needed to develop our state is very important. So, how we build resilient infrastructure will determine whether we can continue to adapt and also grow amid climate change and this uncertain economy. I want to draw the attention of this honourable House to an Enactment that was passed by this honourable House, namely the Enakmen Pinjaman Negeri Pulau Pinang Bank dan Sumber Kewangan Lain 2017, under which the State Government of Penang
is indeed empowered to make loans to finance investment, the implementation of physical, economic and social development for the State of Penang. And the development of infrastructure is also a long-term investment. So, we in this House, since the beginning of our sittings until today, have always pressed for or waited for allocations from the Federal Government. Apart from pressing and waiting, we can also consider or begin to look for ways to obtain loans from banks to finance the infrastructure development projects that we need to carry out. Why? Because the State of Penang, our government, has excellent financial management, and we are also the state with the lowest loans in the whole of Malaysia. So, this is an excellent record that allows us to borrow so that proposals and important projects, critical infrastructure, can be carried out. Among them, the matter that we often raise includes the replacement of the old and leaking PBA water pipes, and on that day the Chief Minister also mentioned that we need a very high allocation to replace those pipes. So, could the government also consider, yes, we can also borrow so that these PBA water pipes can be replaced in the near future. And one more issue, such as infrastructure development at BKIP 2. On that day, the Chief Minister also mentioned that whoever wants to develop the BKIP 2 land would have to bear the high cost of building the infrastructure. But we can also think the other way: can we borrow if PDC can borrow to develop the infrastructure, then that land could be sold, not sold as such because the State Government, PDC land cannot be sold. It can be done through a JV or commercialised with the private sector so that the land can be developed. So, this is one example where we need to act earlier so that infrastructure construction or development is not merely a cost, but is an initial cost that can bring handsome returns in the future. Dato' Speaker, I am also very pleased that while we know the financial position of the State of Penang is that we indeed have an expenditure, a budget that is in deficit, we have also been informed that this Langkasuka Basin, including in the waters of Penang, we have received good news that hydrocarbons are indeed there, and we have also received a reply from Perai that the State of Penang also has ray earth element. So, this is in the areas of Teluk Bahang, Balik Pulau, Bukit Mertajam, Bukit Panchor. All of these have non-reactive, non-radioactive ray earth element of approximately 1.7 million metric tonnes with a value of around US Dollar 21 billion. So, I feel this matter does seem like good news, and earlier many people also mentioned that this may bring a handsome yield for the State of Penang. I feel we cannot just wait for a windfall or just wait for royalties, but for the State of Penang, I feel one thing we need to take into account is the role of the State Government or State Subsidiary Companies, which also need to study or undertake how to extract these minerals. Like this, the State Government does not merely wait for royalties or wait for returns, but takes action as well. I want to give the example of the State of Selangor. We understand that Kumpulan Semesta Sendirian Berhad (KSSB), the State of Selangor established KSSB to manage the exploration, extraction, production and sale of sand, rock materials and also mineral resources.
So, they have expanded their business to venture into new industries and also to offer services such as consultancy, digital innovation, trade infrastructure, mining and also mineral water development through that subsidiary. So, ah, why am I sharing this matter? I feel I am proposing that the government needs to set up a state company to look into this matter, and not merely wait and just wait to get royalties, but we must make efforts because this is land within the State of Penang. And we need, I agree with what Pengkalan Kota said earlier, the State Government needs to have a strategy to optimise the discovery of these mineral resources and also to minimise the negative impacts that will occur when this is carried out.
Clarification from Machang Bubuk.
Bukit Tambun.
Dato' Deputy Speaker, in fact, during the current debate on amending the CMI Enactment, I also once proposed that the State Government should set up subsidiary companies that are more of an enterprise agency in nature, but some parties thought that as a government we should not be involved in business. So, what is Machang Bubuk's opinion on this dilemma? Should we continue to play the role purely as a government, or can we venture as an enterprise agency?
Thank you, Bukit Tambun. I feel that whether we like it or not, we are already involved in business, including when PDC began selling houses; we also have GLC bodies that carry out such business activities. PDC is one of them. So, what is important is how the proceeds are managed and how those proceeds are returned to development and to the welfare of the people of the State of Penang. I feel that is the most basic matter we must ensure. And this is in contrast to the example I mentioned earlier. For instance, in the State of Penang, we also have many rivers that contain sand. When we want to maintain those rivers, we also give permission to private companies to run sand mines in this State of Penang. If we have a company owned by the State Government to control or manage all sand mining activities, which have been proven to need to be carried out according to time and time scale, then they can be well regulated. So, this is one of the things I see this subsidiary company playing a role that is so important, not merely sand, and now we have hydrocarbons, we have rare earth, all of which must be managed well so that the future of our state can be secured.
Dato' Speaker, another issue I want to raise here concerns the 1MDB land in the State of Penang. I have asked a written question to the State Government about the status of the 1MDB land in the State of Penang. There are three (3) parcels of land in Penang owned by 1MDB, but the reply I received is that there is no land registered in the name of 1Malaysia Development Berhad (1MDB) in Penang. So, I was very puzzled because at the previous session of the State Assembly, Term of the State Assembly, we received an oral reply from the Chief Minister on 9 August 2018 that the Land and Mines Officer (PTG) had received a letter from a lawyer dated 14 April 2018 informing that the company 1MDB RE, that is real estate, Air Itam Sendirian Berhad, had changed its name to Air Itam Properties Sendirian Berhad. This means that 1MDB indeed no longer exists, but the land is still there. Only, the owner of the land has changed to Air Itam Properties Sendirian Berhad. I understand, Dato' Speaker, that these lands have been placed with a caveat by the registrar to prevent any sale or purchase transactions on these lands. My question is, apart from placing a caveat, what is a win-win solution for the private party or the landowner and the government to develop the land, the land for the public interest. I understand that in previous terms, the land was to be developed as Affordable Housing land. So, is the government planning to make these lands into Affordable Houses? One more thing, Dato' Speaker, the land in Taman Manggis, the land in Taman Manggis as well. I also asked a written question on the issue of the Taman Manggis land. This Taman Manggis land is located in a very strategic place within George Town, and that land was given ownership to Kuala Lumpur International Dental Centre Sdn Bhd (KLIDC) for the purpose of a hospital. 66% for a hospital and 34% of the development land must be developed as service suites or a hotel, and the hotel, and the hotel is not for sale to the public. So, on 20 July 2010, the State Tender Board (Lembaga Perolehan), according to the reply I received, the Penang State Tender Board agreed to accept KLIDC's tender offer with conditions. One condition imposed on KLIDC is that it must submit a planning layout for the Development Planning Permission (KM Kebenaran Merancang) for the development of a Specialist Medical Centre from MBPP within one (1) year, yes, within one (1) year from the date of the letter of acceptance. Second, it must also complete the development of the Specialist Medical Centre within 3 years from the date of the letter of acceptance. So, my question is, since the land was given ownership to KLIDC more than 13 years ago, the land still has no activity at all. So, my question is, has the sale payment for this land been fully paid by KLIDC? What action is the State Government taking on the issue where the landowner, that is KLIDC, does not comply with the conditions imposed on the grantee of the land. So, I ask that the State Government may provide clarification on the Taman Manggis land. Dato' Speaker, I would also like to draw attention to the Pulau Burung Waste Disposal Site. In the Chief Minister's budget speech, he also mentioned a total solution policy for solid waste management. I also understand that Seberang Perai City Council (MBSP) has taken over the operation of the Pulau Burung Waste Disposal Site since 1 August 2022. My question is, how much is the operating cost that MBSP must bear every month for solid waste management at Pulau Burung
and what is the State Government's plan for this waste disposal site, considering that in the Chief Minister's budget speech he also mentioned that the total solution would include whether waste to energy will be built, and if it is built, is there a road map as to when it will begin operations? Dato' Speaker, also related to solid waste management, we in the State of Penang also have another Jelutong Waste Disposal Site, yes. So, this Jelutong Waste Disposal Site, which we once proposed to build a hall on, the State Legislative Assembly building on the Jelutong Waste Disposal Site. So, I also want to know whether there are any future plans for this Jelutong Waste Disposal Site, considering that the land is also located in a very strategic place, and what efforts the State Government is making to rehabilitate the Jelutong Waste Disposal Site? Dato' Speaker, the next matter I want to bring to the attention of this House is about SJK(C) Lim Chong Eu. I have asked a written question about the current status of the proposal to build the school in the Alma area in Machang Bubok, and according to the government's reply, no application for the construction of a new school has been submitted to the Penang State Education Department. This is something I also want to get clarification from the State Government, because the news about SJK C Lim Chong Eu emerged in 2000, I think 2019, 2019, and we also once received very encouraging news that, as we understand, there is a developer who wants to offer land for the construction of that school, but we do not know the status of negotiations with the developer who wants to offer the land. And here I also want to ask the State Government what efforts the State Government will take to ensure that the construction of this school can be carried out.
Dato' Speaker, this is another issue I want to share here, concerning the workers' dormitory issue in Teluk Kumbar. Earlier this morning, I also received an oral reply from the EXCO, and here I would like to request whether we can be given a report on the Social Impact Assessment study, what was found in the Social Impact Assessment and how the proposed mitigations will be carried out, considering that there are issues including traffic congestion and also social problems that will occur for the local residents. So, I propose that we need to handle this matter more carefully so that we can address these implications well. Finally, Dato' Speaker, in the past we often stated that one of the causes of the State Government's financial problems or constraints was that we were the Opposition at the Centre. However, now that we have a Unity Government at the Centre, we should have more advantages to cooperate and collaborate with the Federal Government. We cannot be too complacent, yes, we need to strive to find solutions that are more innovative and also creative to address the issues faced by our people. Although we are a small state, yes, we also need to ensure that we must reduce bureaucratic red tape and also expedite the approval of permits, and we must also remove or remove the outdated policies, yes. Dato' Speaker, I feel that democracy is a system that helps us achieve a system that is fair, equitable, equitable, yes, for all of us. So we need to ensure that democracy is indeed able to really ensure that democracy functions for our people. So, with these words, once again I would like to thank the State Government and also all
the State Government and Federal Government staff who have, throughout this time, provided us with cooperation and helped us deliver the best service to the people. With these words, I respectfully ask to second the motion, thank you.
Yes, thank you, Machang Bubok, and I invite Bagan Dalam to proceed.
Terima kasih.
Bagan Dalam requests a little more volume, because the timing is a bit low in the evenings.
Make it a little warmer.
Make it a little warmer.
Thank you, Honourable Dato' Deputy Speaker. Salam Perpaduan, Salam Penang 2030 and Salam Malaysia Madani. Inbhame Sulgha Ellorum Valghe (with permission). Thank you for giving me the opportunity to take part in the Debate on the Appropriation Bill 2024 in this honourable House. Dato' Deputy Speaker, the record shows that in 2022, the state of Penang recorded an impressive economic growth in Gross Domestic Product (KDNK), exceeding the growth of the national GDP and that of other states in Malaysia. Penang's economic growth was recorded at 13.1 per cent, compared with 6.9 per cent in the previous year, with a GDP value of 112.1 billion. The manufacturing sector recorded an increase of 15.9 per cent in 2022 compared with 12.4 per cent in the previous year. This proves that Penang remains significant as a destination attracting investors, particularly in the electronic and electrical (E&E), machinery and equipment (M&E), scientific and medical, and industrial equipment industries.
Penang can become an alternative destination for international investors in an era of geopolitical imbalance in Europe, competition in the global economic market between the United States of America and the People's Republic of China, and global economic uncertainty. Therefore, it is very important for Penang to ensure that ease of doing business in Penang (with permission) is improved by strengthening the role of InvestPenang as a One Stop Centre for licensing, factory construction and other support services. InvestPenang should play a role in coordinating with Federal and State agencies such as the Ministry of International Trade and Industry (MITI), the Malaysian Investment Development Authority (MIDA), the local authorities (PBT), the Penang Development Corporation (PDC) and so on. The consolidation of the Penang Skill Development Centre (PSDC) in the development of upskilling and reskilling is to prepare a talent pool that can support industry in Penang. The rebranding of the PBT in providing first-class infrastructure and basic services such as city cleanliness, traffic management, parking management, utility management, flood management, road maintenance and balanced urban management. Accordingly, it would be appropriate if the State Government could hold negotiations with the Federal Government through existing and new Industrial Parks to make Penang one of the Special Financial Zones or Zon Khas Kewangan in the North. In addition, it is appropriate for the State Government to carry out a study to establish new Local Authorities in South Seberang Perai and Barat Daya to manage the rapid development in Batu Kawan as well as the development that will be carried out in PSI. The services sector recorded growth of 11.25 per cent in 2022, while the tourism sector recorded a significant increase in international passenger arrivals at Penang International Airport (PIA).
Penang maintained its status as Malaysia's main exporter, contributing 34.6 per cent of the country's total exports up to September 2023. PIA plays a role as the largest export channel in Malaysia. Therefore, it is appropriate for the State Government to consider establishing a dedicated Terminal 2 Penang International Airport (PIA2) for cargo and not merely expanding the existing airport. The development of PIA2 is proposed to be carried out in Batu Kawan or in PSI, and PIA and PIA2 are to be connected through an express train service as well as an LRT line. The development of PIA2 can boost the growth of the manufacturing sector, the trade sector, the tourism sector and the services sector in Penang, and at the same time can increase the GDP of the State of Penang and make Penang an important economic hub in the Southeast Asian region. Dato' Deputy Speaker, congratulations to the leadership of the Penang State Government for its excellence in developing the state of Penang into one of the most advanced states in Malaysia. Among the mega projects still in the development phase are the Gurney Wharf Project, the Air Itam to Tun Dr Lim Chong Eu Highway Bypass Project, the Penang Waterfront Convention Centre (PWCC) Project, the Andaman Development Project in Tanjung Bungah, and the Penang Hill Cable Car Construction Project in the second quarter of 2024. These projects are in an effort to meet the need for electricity supply in line with rapid development in parts of Penang. TNB is also implementing a project worth RM500 million for the Penang Electricity Supply Strengthening Project, which is expected to be completed in the fourth quarter of 2024 and is expected to be able to supply 2,000 megawatts in an effort to maintain the stability of electricity supply in Penang, and at the same time become a catalyst for economic growth in various fields of industry, infrastructure development, transport and tourism.
Dato' Deputy Speaker, the Penang LRT, which is expected to begin construction in the first quarter of 2024, is a much-anticipated project. The Honourable Prime Minister has given a commitment by allocating funds of RM10 Billion for the development of the Penang LRT through Budget 2024. This project will become a turning point for public transport and traffic management in Penang. This project will also bring Penang to a level equal to development in advanced countries across the world. These mega projects are not only beneficial to the people of Penang but also open up new job opportunities to meet the needs of the people of Penang. In addition, with the development of these projects, the flow of the economy in Penang will become increasingly vibrant and grow in line with the development of the state. Congratulations once again to the State Government of Penang for its very good and effective state administration in line with the principles of good governance based on CAT (Cekap, Akauntabiliti dan Telus, efficient, accountable and transparent).
Dato' Deputy Speaker, the study being carried out by the national multinational oil and gas company on the mapping of 2D seismic hydrocarbons in the waters of the Strait of Melaka's North Sea to explore the hydrocarbon potential by the State Government of Penang. Sorry, in Penang is news that is encouraging for all of us. If successful, it will be a new page in history for the state of Penang. The oil and gas sector is a sector that requires highly skilled manpower and can create new job opportunities for professionals in Penang. Therefore, Penang must be prepared to provide public facilities that support the growth of this sector, as well as the development of a talent pool to supply matching manpower. The development of Penang South Island A should take into account the exploration developments of this sector so that oil and gas-based industries can be expanded in Penang.
Dato' Deputy Speaker, another matter is the discovery of the potential of Rare Earth Elements or REE in Penang, where the EXCO for Housing and Environment announced on 25 November 2023 that the discovery of an estimated 1.7 million metric tonnes of Rare Earth Elements (REE), worth nearly RM100 billion, in Penang involves four areas, namely Teluk Bahang, Balik Pulau, Bukit Mertajam, and Bukit Panchor in Nibong Tebal. This matter must be examined more carefully because it involves areas that are actively developing as well as locations that have been zoned as forest reserves and environmentally sensitive areas. This should be discussed with the agencies that play a major role in land administration and urban planning in Penang, such as the Land and Mines Office, the District Office, the Local Authorities, the Department of Town and Country Planning and other related agencies. Although the REE mining sector can become another economic leap for the state of Penang, we should not jeopardise the safety and lives of our people. I urge the government to carry out a detailed study, especially in terms of the impact of this project on the environment, before any approval is given for this project. I would like to ask the EXCO for Housing and Environment, what are the findings of the Environmental Impact Assessment for this project, if it has been carried out? What steps will the State Government take to ensure the safety of the people?
The State Government should review the Local Plans that have not been gazetted by both PBTs to detail this matter. Furthermore, before a decision for exploration or mining is made, an appropriate enactment should be tabled in this honourable House to detail the safety and environmental control measures to be outlined. Dato' Deputy Speaker, National Energy Transition Policy, National Energy Transition Policy (with permission). In an effort to achieve energy sustainability, the Ministry of Economy has set two main targets under the National Energy Transition Policy, namely the first target of renewable energy use of 70% by 2050. With the commitment to reduce dependence on fossil energy sources, the production and use of renewable energy is targeted to be increased to reach 70% by 2050.
And the second target is an increase in energy efficiency of 20% by 2050. The Federal Government is also committed to increasing energy use efficiency by 20% by 2050. Although the Ministry of Economy has outlined 10 catalyst projects, until now there has been no financing plan for these projects, nor the incentive mechanism offered. Nevertheless, the State Government needs to seize the opportunity to ensure that the implementation of this policy in Penang is intensified to improve the supply of renewable energy to meet the needs of the state of Penang. I would also like to suggest to the EXCO for Infrastructure, Transport and Digital, what is the status of achievement for Target 1 and Target 2? What is the State Government's plan to ensure that we can achieve both of these targets by 2050? Dato' Deputy Speaker, another issue I would like to raise is the additional budget allocation from the Penang State Government for the 28 Tamil National-Type Schools in Penang. For the information of this honourable House, there are 28 Tamil schools in the state of Penang, namely 7 on the Island and 21 in Seberang Perai. I am very grateful to the Penang State Government because since May 2008, Penang has been the only state in Malaysia that succeeded in forming the Penang Tamil School Special Committee to identify the problems faced by Tamil schools in this state and to recommend steps to improve the quality of learning and improve the infrastructure of Tamil schools, especially those located in rural areas. Starting in 2009, the Penang state government has provided budget allocations to all Tamil schools in this state until now. Most Tamil National-Type Schools are vernacular schools built in the colonial era, which do not receive full assistance from the Federal Government like national schools. Most Tamil schools do not receive funding assistance from the Federal Government. The allocation of RM2 million given by the Penang State Government each year, if divided on average among 28 schools, is very inadequate to cover the costs of teaching and learning in Tamil National-Type Schools.
The significant increase in the number of students in Tamil schools, where the basic needs of schools in all internal and external aspects have also increased, need base to achieve excellent results, excellent outcome (with permission). The additional budget allocation can help Tamil National-Type Schools improve teaching techniques as well as learning of subjects that now involve high costs for schools and burden parents and teachers, especially those from the B40 group. I sincerely believe it is unfair, unreasonable and inappropriate for any school where students fall behind due to lack of essential requirements in the education system with the principle of no student shall be left behind (with permission). Therefore, I humbly request the kind consideration and deliberation of the Honourable Chief Minister of Penang and the Penang State Government to give due consideration to the allocation of additional funds to Tamil National-Type Schools in the coming state budget.
Dato' Deputy Speaker, I would also like to propose Bagan Dalam as the main public transport and logistics hub for the economic development of Penang. In the early 70s, Bagan Jermal was the main industrial hub in Seberang Perai, while Bagan Dalam was the most important transport hub in driving industrial growth in Penang. However, in an era of rapid development in Penang, Butterworth has been sidelined and not taken into account in the state's major development. Therefore, it is appropriate to give new life and focus to the redevelopment of Bagan Dalam towards becoming the main public transport and logistics hub of the state of Penang. Among them is the Penang Sentral Development. The continuation and consolidation of development at Penang Sentral is an important step in strengthening the role of Penang Sentral as an integrated public transport hub for the northern region. The development of Penang Sentral should be continued with the provision of an LRT network, ETS, KTM Komuter, traditional ferry facilities, an Integrated Bus Terminal, a freight train network (freight train), in addition to the road and highway network that will connect directly to the North-South Expressway. It is hoped that the State Government will hold negotiations with the Federal Government in continuing the implementation of the Penang Sentral development plan. And the second is the renewal of Penang Port and North Butterworth Container Terminal (NBCT). The improvement of Penang Port and NBCT is strategic for expanding the capacity for handling the transport of goods. This improvement should focus on operational efficiency, increasing cargo handling capacity, and improving logistics facilities. By maintaining international standards, Penang Port will be able to remain a main logistics gateway, supporting the state's economy and facilitating international trade. And the third, the addition of warehouses in Bagan Dalam. The addition of warehouses in Bagan Dalam is a practical step to deal with the increase in the entry and exit of goods through Penang Port and NBCT. Sophisticated and effective warehouses can speed up the process of storing and distributing goods, as well as reduce logistics congestion. This initiative plays an important role in increasing transparency and efficiency in the supply chain, benefiting local businesses and international traders. The State Structure Plan (RSN) and the Local Plans should identify Bagan Dalam as the main public transport and logistics hub for the Economic Development of Penang. The Local Plans should take into account the need for warehouse development in Bagan Dalam. And the fourth, the development of the area in Bagan Dalam. The comprehensive development of the Bagan Dalam area may involve the integration of various sectors such as housing, trade, recreation, industry and transport. This development should take into account the needs of the local population and ensure environmental sustainability. By providing well-planned space for business and services, this area can become a dynamic economic centre, providing a variety of job opportunities and generating sustainable economic growth. Dato' Deputy Speaker, through these measures, Bagan Dalam will not only become an effective public transport centre, but also a main logistics centre that will support the economic growth of Penang. This development should be in line with the aspiration to make Penang a main destination for investment and business, and ensure sustainability in economic and infrastructure development. Dato' Deputy Speaker, Penang State Budget 2024 has been prepared by adopting the principle of outcome, focusing on the success of state planning to improve the well-being of the people. The State Government's commitment in implementing projects and programmes to drive the state's socio-economic growth, in line with the Penang2030 Vision, is much praised. The Honourable Chief Minister has tabled Budget 2024 with operating expenditure of RM1.047 billion for 2024, where the projected deficit increases to RM0.514 and revenue collection is expected to continue contributing RM0.533 billion. Nevertheless, the deficit is expected to be financed through the consolidated trust account, which has a balance of RM1.67 billion. However, it is reminded to the State Government that the proposed deficit value is 96.4% of revenue for 2024. This percentage is very high and is likely to affect the fiscal position of the State Government in the coming years due to the reduction of government savings reserves. Therefore, it is advised that the State Government practise economical spending and take appropriate saving measures to ensure that the financial sustainability of the State Government is continuously preserved, while ensuring continuous development for the welfare of the people and the economic growth of the nation. The Penang State Government also needs to take into account issues of urbanisation, the impact of climate change, food security, water security and traffic management related to economic growth. The welfare of the people of Penang should become the basis of the Penang2030 vision in becoming the discourse of the administration of the Penang State Government. Dato' Deputy Speaker, I humbly request to support Budget 2024.
Thank you, Bagan Dalam, and now I invite Permatang Pasir.
Assalamualaikum WBT and greetings of peace.
Ada pantun?
Yes, there is Dato'. Alhamdulillah. (Recitation of prayer). Thank you Dato' Mr Speaker, the Honourable Chief Minister, all Exco members of the State Government, Honourable colleagues, heads and directors-general of departments and agencies. Next, ladies and gentlemen. There is a pantun: My apologies (unclear), Permatang Berangan asks to debate. Thank you to Dato' Mr Speaker for giving me the opportunity to also debate the Supply Bill and the Development Expenditure Estimates 2024. Dato' Mr Speaker, as we pursue the aspiration of a smart and green state based on the family as the nation's inspiration, we must also realise and be mindful that the economic growth of this state must not marginalise the lower-income groups and the hardcore poor. Although our GDP has grown beyond national GDP growth and that of other states. The reality is that the state's budget deficit has continued to rise since 2020. In 2020 our deficit was around RM273.5 million. In 2021, our deficit was RM403.8, in 2022 RM449.8, in 2023 RM467.12, and in 2024 it rose to RM514.52. And what is the main cause of this increase? Is it because the State Government, in pursuing the target of a developed and high-technology state, is spending a large amount while state revenue is limited? Or is the Federal Government neglecting the State Government in the development stream of the state, as mentioned by the Honourable Chief Minister when tabling the Supply Bill last Friday. I request an explanation. Job opportunities. Dato' Mr Speaker, I would like to draw attention to the 67 projects and 4,738 job opportunities mentioned by the Honourable Chief Minister. What guarantee does the State Government have to ensure these job opportunities are obtained by local people, and how will it ensure that the opportunities benefit local workers rather than foreign workers? Dato' Mr Speaker, at the end of 2022 and early 2023, Penang through InvestPenang carried out investment missions to targeted countries such as Singapore, South Korea and several countries in Europe. From these investment missions, what results were obtained, and how many companies have shown interest in investing in this state? The Cassia City Technology Park offers 250 acres of new industrial land, and investors are expected to begin 16 factory construction projects there. Of these 16 factories, I would like to know how many have been built and have begun operating. Dato' Mr Speaker, in the effort of small and medium industry (IKS) entrepreneurs to increase business opportunities and expand their businesses (interruption).
Oh ship. Just now... because just now I mentioned Singapore. We can go to Singapore lah. (Interruption) Okay, continue, continue.
Dato' Mr Speaker, in the effort of small and medium industry (IKS) entrepreneurs to increase business opportunities and expand their businesses, what efforts does the State Government make in helping these IKS entrepreneurs. On the InvestPenang website I found that company profiles are listed, and I have been informed that so far a total of 610 companies have registered in this directory. I would like to request an explanation from the 610 that are registered: how many companies have obtained business opportunities together with foreign investors? We also hope the government does not forget the small and medium enterprise (PKS) sector, which has been widely operated all this time. I request that the State Government list the efforts and steps the State Government takes to drive this sector. Dato' Mr Speaker. In an effort to improve service delivery at community centres, the state assembly constituencies (KADUN) in Penang, the State Government has launched a digital system, the Integrated Service Centre (ISC), in 40 KADUN across the state. So far only 17 KADUN have actively used this system. I request an explanation from the Honourable Exco member: why do the other 23 KADUN not use it? Is it because they are worried that the stored data is not secure? Dato' Mr Speaker. A total of RM10.18 million has been allocated for the construction, renovation and improvement of mosques and surau in Penang, and RM718,250 to strengthen Islam by organising state-level events. I request an explanation from the Honourable Exco member: how much allocation is there for dakwah efforts, and does the State Government intend to allocate funds to Islamic dakwah NGOs in Penang. Dato' Mr Speaker. As we pursue the state's progress, let us not forget rural areas that still lack infrastructure facilities such as roads, drains and ditches. What is the government's effort to ensure that those in rural areas can share in the progress together. Mr Speaker. Out of a total of 42 beneficiaries with a total allocation of RM2.23 million, list the total number of new houses built and list how many have been repaired, and what are the main conditions for applying for house construction? Dato' Mr Speaker, Penang is well known for CAT: Cekap (Efficient), Akauntabiliti (Accountability) and Telus (Transparent). In the report of the Malaysian Anti-Corruption Commission (SPRM) in 2022. Abuse of power and receiving bribes is worrying. Titled, let me say the title. Abuse of power and receiving bribes is worrying in Penang. In a report by Harian Metro on 29 September 2022, the SPRM received 919 complaints; of that total, 312 involved receiving bribes and 147 cases were abuse of power, and the remainder were false claims. It is common knowledge that this corruption also exposes the state to risk and has great potential to cause loss of confidence among investors at the global level and cause losses to the state. My question to the Honourable Chief Minister is: what is the total number of civil servants who have been subjected to action in the state of Penang during the period 2018 to 2023 due to corruption, and what is the State Government's plan to ensure the CAT slogan is realised, and not merely a slogan. Dato' Mr Speaker. I also thank the State Government for the allocations and contributions to KAFA teachers, religious school teachers, tahfiz teachers and pondok teachers. I also hope that the State Government will not forget the Quran teachers who teach in mosques, surau and in homes, although Zakat Pulau Pinang does give contributions through applications made via the mosque chairmen. My suggestion is that it would be better for the State Government to allocate a budget as appreciation for their service in teaching the Quran to the community. Dato' Mr Speaker, as we seek to achieve environmental sustainability, we also need to balance development so as not to disturb wildlife ecosystems. This is so that wild animals do not disturb and damage crops in residents' surroundings. For example, what happened in Permatang Pauh, the matter of pigs, wild boars that roam a lot in the village, in almost all villages, pigs roam a lot. So, when we cut down forests for development, ensure that there are places for wild animals to live. Digital economy. Dato' Mr Speaker, the installation of closed-circuit television (CCTV) cameras, where a total of 1,217 CCTV units have been installed by both local authorities (PBT), namely 1,019 CCTV in the island area and 198 CCTV in Seberang Perai. How much is the maintenance cost and what efforts does the government make to ensure all these CCTVs function well? I would like to know the contractors involved in the maintenance work for these CCTVs. The Penang Smart Parking (PSP) application, which has been widely used by Penang residents since it was launched on a pilot basis in 2019. The total number of downloads as of 22 October 2023 is 1.2 million. This application is also understood to be actively used by 262,778 users. As mentioned, PSP has recorded total parking collections of RM68.66 million for both PBT, with a breakdown of RM45.7 million at the Penang Island City Council (MBPP) and collections at the Seberang Perai City Council (MBSP) totalling RM23 million. My question is whether these collections are calculated based on each user's top-up, that is, the reload value, or based on the number of parking sessions and the amount paid for parking. So that is all I can convey. Thank you, I beg to support.
Thank you. Permatang Pasir, who also supports. Please proceed, Kebun Bunga.
Thank you, Dato' Deputy Speaker. The Honourable Chief Minister and also my fellow colleagues in this august House. I beg to debate the Supply Bill 2024 for the state of Penang. Earlier we heard, Dato' Deputy Speaker, that many colleagues had raised the deficit that the State Government has to bear in the 2024 budget. Expenditure for the 2024 budget is valued at RM1,011,170,179.00. Only I understand that the reimbursement from the Federal Government to the state of Penang totals only RM21 million. If we look at the federal government's contribution based on the level of economic, infrastructure and well-being development, perhaps the State Government could explain to this august House what indicators the State Government takes into account in giving reimbursement to the state.
I think the same indicators are applied by the Federal Government to all states so that we can understand why the total contribution of the Federal Government to the State Government is only RM21 million when compared with Penang's economic contribution to the Federation. Dato' Deputy Speaker, in 2024 Operating Expenditure is RM1.04 billion, which will increase by 58 million. In my view, if activities and programmes carried out bring benefit and well-being to the people, then there is nothing wrong with the State Government increasing Operating Expenditure. Because the State Government is not a corporate company that is only motivated by profit. The main aim of a government is to look after the well-being of the people and also to carry out good activities and projects for its people, and I also give appreciation to the State Government for good management of financial funds and in accordance with excellent governance, to the extent of receiving praise from the Auditor General. Dato' Deputy Speaker, my suggestion to the State Government is that, to ease the financial burden, especially the RM100 million that the State Government has to bear for the programme or scheme I-Sejahtera, perhaps the State Government could transform these schemes into a more effective social safety net programme, in my view, especially like the I-Sejahtera contribution that gives support to housewives. Perhaps we could encourage these housewives to contribute to PERKESO (Social Security Organisation) or the EPF (Employees Provident Fund), which in future will provide contributions or returns that are much more substantial than just paying RM100.00 a year.
Dato' Deputy Speaker, here I would also like to raise one issue with the State Government because I see it has not been raised in the budget. In the Penang Pakatan Harapan State Manifesto, the Program Mempelai Emas was pledged, namely RM500.00 for couples who marry, because during the State Election campaign, I often gave speeches and I gave a guarantee that after this, everyone who marries would receive RM500.00. So I want certainty: will this programme be carried out in 2024, and also what financial implications will be borne by the State Government. Dato' Deputy Speaker,
Kebun Bunga, are you married yet?
Alright. Dato' Deputy Speaker, I would like to move on to the issue of the HPV vaccination. According to news reports, it is understood that, according to the Deputy Minister of Health, there are 820,000 students who were left out of this HPV vaccination through the National Immunisation Programme, especially in 2020 and 2021, when the country was facing COVID, the pandemic, school closures, and also a reduced supply of vaccines on the world market. So I also want to know how many more students in the state of Penang have not received this HPV vaccine. Based on the guidelines from the Ministry of Health (KKM), female students aged 13 in every school will be given the vaccine as a measure to protect against cervical cancer, where cervical cancer is the third most common cancer among young women. Furthermore, the detection rate for this cancer is only 40%. The cancer is detected at stage 3 and 4, which is why the importance of this vaccination is that it provides an early measure to curb
young women from suffering from cervical cancer. So I want to know the number of students in Penang who have not yet received this HPV vaccine, so that none are left out and so that it does not become a medical burden on the country in the future. Dato' Deputy Speaker, during the winding-up of the Honourable EXCO Member for Local Government, I did not have the opportunity to ask, but this question, so I take this opportunity to ask the Honourable EXCO Member. First, I would like to congratulate the Penang Island City Council (MBPP) for gaining global recognition for its services, especially the Special Award for Sustainable City 2023, the Malaysia Smart City Rating Award and also the Financing Sustainable Urbans Award. I extend my congratulations and appreciation to MBPP. This means the service quality of MBPP is improving and is recognised in the global community. However, I feel there is still room for improvement, especially, for example, cleaning contractors must carry out cleaning work according to the schedule that has been set, not only when there are complaints or when there is a complaint from MPKK, or the State Assemblyman's Office, and only then action is taken. Regarding these complaints, I want to raise the issue that some MBPP officers often disclose the complainant's information to the offender. I am also one of the victims of this issue. So I hope MBPP will continue to practise professionalism in carrying out its duties and must protect complainants who provide information. I suggest that MBPP improve the existing complaint system so that it is not leaked so easily. In this honourable House, I also want to seek certainty from MBPP as to whether letters written by the Honourable State Assemblyman or the Honourable Member of Parliament will be considered by MBPP for reducing compounds, reducing fines, or reducing or not taking action at all. This is because my Service Centre is often visited by offenders who committed these local authority offences, asking for a letter from the Honourable Member so that they can give it to MBPP. If they are told this is a recommendation from MBPP, then I want certainty here as to whether this letter will provide a guarantee that it will be taken into account in reducing the compounds or fines for the offences they face. Dato' Deputy Speaker, on tourism, the Federal Government previously granted VOA to tourists from China. Yesterday, the Honourable Prime Minister announced visa exemptions for tourists from China and also India to enter Malaysia for 30 days. I think this will certainly boost the tourism sector in Penang. The only question is whether the State Government is ready to receive an influx of tourists, with better facilities at the airport. I do not wish to debate infrastructure, but by facilities I mean things like information signage, sign boards, and also the placement of language interpreters at Penang International Airport, so that tourists entering Penang can enjoy higher-quality services. And also in promoting the tourism industry in Penang, how aggressive will the State Government be in taking initiatives or steps in line with the Honourable Prime Minister's announcement? Besides that, I also want to raise an issue regarding parking at the International Airport. I have received many complaints from users of the airport parking building, where the parking system is troublesome for users who are parking their cars. Perhaps the State Government could review or discuss with MAHB to improve the parking systems so that payments are easier to make. Dato' Deputy Speaker, I now move on to the issue of Science, Technology, Engineering and Mathematics. The Federal Government has set up this STEM Committee to address several issues that need to be resolved, especially the mismatch of graduates in this field. This committee is made up of the Ministry of Education, the Department of Higher Education and also the Ministry of Science, Technology and Innovation (MOSTI). Recently, the State Government sent 300 students and undergraduates to take part in the Techlympics competition organised by MOSTI, where last year the state of Penang was the champion, and this year we are still waiting, so I hope this year the state of Penang will also win the championship. However, based on the public awareness survey on S&T, Science, Technology and Innovation in Malaysia in 2022 conducted by MOSTI, it was found that the percentage of students joining the STEM stream from 2017 to 2022 recorded a decline, from 45% to 40.9%. I would like to ask the State Government, as Penang is the backbone of the development of high-technology industries such as semiconductors, what more aggressive steps will be taken to attract students to join this STEM field? Collaboration between Tech Dome Digital Penang, Penang Science Cluster and other agencies in Penang is needed to ensure that these efforts achieve their objectives, especially in today's world where we place emphasis on STEM studies. Dato' Deputy Speaker, coastal areas and the sea are indeed a robust ecosystem that is reciprocally interconnected. The forests in Penang consist of various types, and one of them is the mangrove forest. According to global statistics, mangrove forests make up only 4%, and Penang is fortunate to have these mangrove forests. According to studies, mangrove forests succeed in absorbing carbon in the atmosphere and breaking down stored carbon through the process of decomposition. Based on the importance of these mangrove forests in the Penang State Structure Plan 2030, what is the State Government's plan to gazette more mangrove forests as gazetted forest reserves in this state, as announced previously, because based on current records there are only 381.4 hectares of mangrove forest that have been gazetted as forest reserves in this state, which is only 7% of forest reserves, and the area of mangrove forest has also declined from 1,967 hectares in 2017 to 1,050 hectares in 2020. So what steps is the State Government taking to ensure that these mangrove forests will no longer decline and are gazetted as forest reserves? Regarding the issue of food security, I also extend my appreciation and thanks to the State Government for succeeding in ensuring that, for 6 consecutive years, it has been the highest producer of paddy in this state, namely an average of 5.7 metric tonnes per year, but this figure is meaningless if the people of Penang cannot enjoy cheaper rice. So what steps will the State Government take to ensure that the people of this state enjoy cheaper rice compared with other states, since we are the highest producer nationally? I want to know the steps that will be taken by the State Government, including whether the State Government will set up its own rice mill so that the people of Penang can enjoy cheaper rice. I also want to propose to the State Government, Dato' Deputy Speaker, that in facing the ageing population, will the State Government transform the Penang 2030 Centre into an entity that focuses more on
the affairs or programmes for the elderly? We have MPKK which looks after the welfare of all citizens, JPPP which looks after the affairs of young people, and JPWK which looks after the affairs of women. So as a state that will receive a high impact from this ageing, will the State Government also set up an entity to ensure that we can face this challenge more perfectly and can produce or establish policies and programmes that ensure this ageing will not become a bigger problem for the State of Penang. Dato' Deputy Speaker, finally, I move on to issues in areas that I did not have time to complete during the debate last week. Here I would like to propose to the State Government the Equipment Assistance Scheme. Under this Equipment Assistance Scheme, the State Government will give three, a maximum of 3,000, to recipients to purchase business equipment, business equipment and its approval is subject to the District Poverty Eradication Focus Group (FGD) Committee, where this committee will only meet once a month, Dato' Deputy Speaker. So the process can take up to 2 months. Will the State Government consider reducing this red tape, where perhaps approval could be given only by the District Officer or certain officers, so that it does not have to go through the committee, because RM3,000 is not... (disturbance).
Request for the floor, Kebun Bunga. Honourable Dato' Deputy Speaker, I would like to add to what was proposed by Kebun Bunga, that at this time the process of approving equipment assistance does indeed take far too long. By the time the approval is obtained, the entrepreneur may already have bought the equipment and it is no longer relevant, or without government assistance they may not be able to continue the business. Most of these applicants are indeed small traders who really need assistance from the government. Therefore, I support Kebun Bunga that the State Government expedite the consideration process in this matter.
Thank you, Bukit Tambun. I agree with my friend because indeed the process now takes up to 2 months. So after 2 months, that thing may no longer be needed, so I hope the State Government will give due consideration to shortening the application period and also reducing this red tape. The last issue is that I would like to call on the State Government, especially the local authorities, to ensure that developers of any housing project fulfil the infrastructure requirements they have promised, whether under the Planning Permission (KM). One issue is that from Persiaran Halia 3, the road project from Tri Pinnacle to Mont Residence is not completed, even though it was included in the Planning Permission, but the developer has not completed this road project, and this causes the housing area to often have too many vehicles and traffic congestion.
So I hope that from now on the State Government will exercise tighter control to ensure that developers can implement the infrastructure projects that they have been required to provide in this Planning Permission. That is all for my debate, as I request to support this Bill. Thank you, Dato' Deputy Speaker.
Thank you, Kebun Bunga. The floor is given to Seri Delima.
Thank you, Dato' Deputy Speaker. Good afternoon. Greetings of peace. Greetings, Penang 2030. Greetings, Malaysia Madani. I address my greetings to Dato' Deputy Speaker, the Honourable Chief Minister, the Honourable Members of the Exco, fellow ADUN, Heads of Department, and all the respected ladies and gentlemen. First, I would like to thank Dato' Deputy Speaker for giving me the opportunity to take part in the debate on the Supply Bill and the 2024 development estimates motion in this esteemed House. On this occasion, I would like to extend a hearty congratulations to the Honourable Chief Minister for tabling the comprehensive, progressive and robust 2024 Annual State Budget of Penang, which covers various aspects of development, even though this year's budget deficit is larger than last year's. Therefore, I am confident that the administration under the leadership of this Honourable Chief Minister will ensure that every sen spent yields the optimum margin of benefit to the people. The Clean Report given by the Auditor General to the State Government is proof that this government is one of integrity. This expansionary budget is seen as able to drive the Penang economy in the face of global economic uncertainty. The strategies taken, such as the development of Gurney Bay, the modification and improvement of the public transport system, the creation of new open spaces and the provision of more affordable housing, will certainly enhance the economic competitiveness of the state while at the same time not neglecting the liveability and viability of the people. Dato' Deputy Speaker, in navigating the waves of global challenges in terms of geopolitics, public health and rapid climate change, the Penang Government has drawn up a sufficiently comprehensive plan in this budget that is intended to protect the future of the people, or future-proof, with permission. My speech today is divided into 5 main aspects, namely Caring for Education, Caring for Sustainability, Caring for Welfare, Caring for Creativity and Caring for the Economy.
Number one, Caring for Education. Education is a very important aspect for creating a future-proof society. Penang has many high-quality institutions, and each of them plays an important role in the development of the state. I welcome the decision of the Court of Appeal that ruled that the existence and establishment of vernacular schools, and the use of Mandarin and Tamil in those schools, are constitutional.
The Court ruled that the establishment and existence of vernacular schools does not violate Article 5 on personal liberty, Article 8 on the right to equality, Article 10 on freedom of speech, assembly and association, Article 11 on freedom of religion, and Article 12 on rights relating to education of the Federal Constitution. In this regard, I would like to extend congratulations and well done to the Penang State Government, which is forward-looking, and the Penang State Government is the only State Government in this country that systematically allocates special funds to various vernacular schools, including Tamil schools, Chinese schools, Mission schools, private secondary schools and so on, since 2009. Accordingly, in 2024 the Penang State Government will also allocate more than 10 million to various schools to support the infrastructure of schools in Penang. I would like to call for the issue of vernacular schools to no longer be politicised, and the efforts of the State Government can be taken as a good example and model for other states. Members of the House thumped the table.
Second, Caring for Sustainability. I am very proud as a Penangite that our government is always caring towards the aspect of sustainability. An efficient public transport system is very important in this sustainability agenda. This is because, according to the International Energy Agency (IEA) in its study in 2019, transport was the second largest contributor of greenhouse gases in Malaysia, with approximately 50 million metric tonnes. Imagine 50 million metric tonnes is equivalent to the weight of 150 Empire State Buildings in New York. Therefore, we need to increase the use of greener modes of transport to realise the investment of 21 million for the Penang Transport Master Plan. The government can also explore the use of electric vehicles and extend the water transport network through sea routes, which has been widely publicised. A comprehensive water public transport system is certainly suitable for Penang's geography, which is surrounded by the sea. Therefore, I would like to ask what is the status of the water taxi service, or water taxi, that was proposed previously. This water taxi service, which connects the areas of Straits Quay, Georgetown and Batu Maung, is also a complement to transport facilities, and moreover it does not disrupt the smooth flow of traffic and can become an alternative attraction for tourists. In addition, it also benefits local residents as an alternative mode of transport besides buses, and thus tends to reduce the use of private vehicles. Therefore, I hope the State Government will consider expanding the water taxi system to more areas such as Seberang Perai, Telok Kumbar and Batu Feringgi, so that residents in these areas are also given an alternative public transport. Furthermore, noting the special assistance to buyers of electric motorcycles given by the Honourable Prime Minister, amounting to 2,400 in Budget 2024, efforts should be stepped up to promote the ownership of electric motorcycles by providing more battery charging points and special parking spaces for electric motorcycles. Besides that, the government's efforts to ensure that the State of Penang continues to be a bicycle-friendly state should be continued, to help reduce carbon emissions. Although cycling tracks have been provided along 205 km across the entire island, including 45 km of dedicated cycling tracks, will they be further expanded, and will the cycling track master plan be reviewed to make our state the first cycling state in Malaysia that is truly bicycle-friendly?
In terms of energy generation, the government needs to study making Penang one of the centres of solar energy generation because of its location on the Equator, with an average of 2,473 hours of sunlight receiving sufficient solar heat throughout the year. This can significantly reduce dependence on coal and oil. At the same time, in line with the views of the Honourable Minister of Economy, house occupants who plan to install solar panels should also be given incentives to ease the installation costs, and likewise for housing developers who plan to turn the rooftops of houses in their projects into mini solar farms, as well as on all premises including schools, factories and other commercial centres. The energy generated by these private solar panels can be sold back to the government to supplement our national grid electricity supply. Therefore, it brings benefits to those who install solar panels, the government and the environment. A win-win situation for all, with permission.
Third, Caring for Welfare. In the mission to create a family-based city with high liveability, the welfare agenda for women cannot be neglected. As the proverb goes, the hand that rocks the cradle can shake the world. I would like to welcome the efforts of the PWDC, the Penang Women's Development Corporation. The government's proposal to further strengthen the safety and dignity of women through the First Support Point programme is commendable, as it will save more women from becoming victims of abuse. Household harmony is indeed important for empowering women. However, to complement the psycho-social welfare of women, especially housewives and single mothers, they must also be protected in terms of economic welfare. Therefore, I am of the view that, just as with the special allocation of the Penang i4.0 Seed Fund managed by investPenang, I am of the opinion that the government should provide start-up grants that act as micro-credit support for starting businesses for women. We also need to create a competitive women's entrepreneurship ecosystem. Selangor State, for example, has the Selangor Women Entrepreneurs League, which provides a support community for women traders. The question is, does Penang have its own women entrepreneurs league in planning, and when will we implement our entrepreneurs league? Support in the form of guidance, or partnership with experienced traders, is very important to enable women who wish to do business to strengthen their skills, knowledge and self-confidence.
Dato' Deputy Speaker. Turning to another important aspect of people's welfare, health. The rise in cases of unknown pneumonia in the Beijing and Liaoning regions of Northern China has caused us concern. Although investigations by the WHO have assured the world that these cases are caused by existing pathogens, the reality is that it has led to congestion in hospitals, because this pneumonia is tending to have a bad effect on children. Therefore, we in Penang must be prepared to increase the capacity of our public hospitals, and to mobilise private hospitals to cooperate with public hospitals to receive patients through the decanting process. The supply of medicines, especially anaesthetics, fever medicine and flu medicine, must be increased, and surveillance of pneumonia must be strengthened. If necessary, the Health Department should also identify and prepare sites for field hospitals to accommodate the influx of patients, as happened during the delta pandemic wave in mid-2021. The State Government should also aggressively urge the Ministry of Health to upgrade the ward facilities and health facilities at Penang Hospital and Bukit Mertajam Hospital. The facilities of community clinics and village clinics also need to be improved.
Fourth, Caring for Creativity. Dato' Deputy Speaker. The uniqueness of George Town's architecture, which has been influenced by Britain, the Netherlands, France, China and the Middle East, certainly places it in a suitable position as a filming location. Two weeks ago, a film titled The Locksmith was screened in cinemas across the country. This film stars several leading Hong Kong stars as well as local stars. More proudly, the director, Wu Peoi Ji, is a native son of Penang. With attractive urban architecture and landscape, as well as a fairly high quality of life, Penang actually has the potential to host international film companies as an operational base for their film production in Southeast Asia. Therefore, I would like to propose that the film application process be made easier, such as by giving tax rebates or exemptions, as well as professional film production support services, which indirectly showcase the beauty of our state in cinemas and on television screens around the world, and further boost the economy of this state. In addition, the government also needs to be active in attracting investment to create an integrated international media and creative arts hub in this state. This hub can be integrated into new development projects, for example the Penang South Island Project, The Light or Gurney Bay. Lessons can be drawn from the Media City UK project in Manchester, where a waterfront area that had become dim and neglected was redeveloped with television studios, film studios, along with condominiums, hotels and recreational areas. I welcome the development of The Light, which in particular will house the Ling Xiang Xiong art gallery, which upon completion will become a new icon and can be further utilised to create a creative hub that houses graphic studios, film studios and music studios from within and outside the country, thereby creating an active arts ecosystem there. If my proposal is realised, it will make The Light IJM Waterfront a focal point of arts activities in the Southeast Asian region. At the same time, the convention, hospitality and residential facilities that are also being developed can attract more arts enthusiasts to visit The Light and make it a suitable residential destination for arts practitioners who settle there.
Fifth, Caring for the Economy. In connection with recent economic care, the people of Penang must certainly be pleased with three good pieces of news. Firstly, the relaxation given by the Chinese Government in terms of visa exemption for work visits and holidays not exceeding 15 days, and the reciprocal policy of the Federal Government that allows Chinese citizens to holiday or conduct business in Malaysia without a visa for up to 30 days. Secondly, a seismic study of the potential for hydrocarbon extraction carried out by PETRONAS in two plate tectonic blocks near Penang and Langkawi Island. Thirdly, regarding Penang, there are Rare Earth Element (REE) deposits worth nearly 100 billion discovered in four (4) areas in the State of Penang. Regarding the first news, the people of Penang will certainly welcome the positive policy launched by the Chinese Government on the eve of the 50th year of its diplomatic relations with Malaysia, as well as the reciprocal policy by our Federal Government. The visa relaxation between these two countries for the coming one-year period starting from 1 December 2023 will open up more opportunities for our state to explore new investment opportunities emerging in China and, at the same time, target Penang as an attractive tourist destination for the middle-income and elite groups alike.
Relevant agencies such as investPenang, PCEB and PETACE must start multiplying promotion in China and explore opportunities for negotiation with more Chinese airlines to start direct flights to major cities such as Shanghai, Beijing and Chongqing. The Federal Government, on the other hand, should appropriately play a role in fulfilling its promise to expand Penang International Airport as soon as possible, so that the state can compete as an aviation hub in the north of Malaysia, and thereby attract more high-value residents to the MM2H programme. The second news: the potential for hydrocarbons in the plate tectonic area of the Langkasuka Basin around our island. This news has given rise to the impression that Penang may develop further and become like Dubai or Qatar in the near future. Although the realisation of this dream depends on confirmation of the existence of oil resources in the area, it also depends on the distribution of oil royalties by the Federal Government. Therefore, I would like to call on the Federal Government that, if it is confirmed that there are hydrocarbon deposits around our island, the State of Penang must, must be given a fair distribution of oil royalties and be allowed to obtain tax revenue from such extraction. Members of the House thumped the table.
Fifth. Conclusion, we have come to the end, okay. In conclusion, the 2024 Budget of this island... Penang... clearly reflects how committed the State Government is to improving the viability and quality of life of the people of Penang. However, the government's deficit must be given attention. Therefore, the government must ensure that every project developed from now on is fully utilised by the people. At the same time, we must explore alternative income to diversify our sources of funds. Thus, I humbly ask for support. That is all, thank you.
Okay, thank you, Seri Delima. Next, I invite the Member for Batu Uban. Please proceed.
Thank you, thank you, Dato’ Deputy Speaker. Greetings of peace, greetings from Penang2030 and Malaysia Madani I extend to the Honourable Deputy Speaker of the House and to the Honourable Members of this House. First, I also wish to thank all the government staff and the agencies for their commitment to developing this state of Penang. I also wish to thank Dato’ Deputy Speaker for giving me the opportunity to debate the Supply Bill and Development Estimates Motion 2024 that was tabled by the Honourable Chief Minister. Before that, I take this opportunity to congratulate Penang FC for winning 3-2 against Pahang yesterday. Members of the House thump the table.
My congratulations to our chairman, the Honourable Padang Lalang, and to the other members of the Board, because this is a long-awaited victory, and we have two more matches left, against Terengganu and JDT. We ask our fellow Honourable Members to come to the stadium to support, hah. That must be asked of... yes, the Honourable Padang Lalang (laughter). Let us return to the budget speech, Dato’ Deputy Speaker. I also wish to express my congratulations to the Honourable Chief Minister and to the State Government of Penang for tabling a budget that I can say is the best for the people of Penang, even though the country is facing the effects of an uncertain global economy arising from the trade war and the instability of world politics. I commend the State Government for the growth of the state's gross domestic product (KDNK), which recorded RM112.1 billion, which exceeds national GDP growth and also surpasses the state GDP of other states in Malaysia. Congratulations to Penang. Generally, the main sectors such as electronics and electrical (E&E), machinery and equipment (AME), services and tourism have contributed to the positive development of this state's economy. Penang also continues to stand on firm ground, having succeeded in attracting new, high-impact investments throughout last year despite global economic uncertainty. These are certainly due to the political stability of the state of Penang, good and sustainable infrastructure, and the extensive provision of human capital in the fields of engineering, science and technology through Penang STEM, Penang Science Cluster, Tech Dome and vocational institutions, as well as overseas visits by the State Government leadership, which have succeeded in attracting larger and broader investments into this state of Penang.
Dato’ Deputy Speaker. However, the State Government must ensure that these investments remain, because we are also facing competition not only domestically but also from abroad, such as Singapore, Indonesia, Vietnam and Thailand. Therefore, I hereby wish to outline five (5) strategies that the State Government should focus on in order for us to attract investors and retain these investments. First, we must create a stable and predictable business environment, because a stable and predictable business environment is among the important matters investors consider when deciding to invest. This means the State Government must have a transparent regulatory framework, clear laws and policies, and consistent policy implementation. I also wish to congratulate the State Government of Perpaduan because we have been able to maintain political stability in the state of Penang by retaining the two-thirds majority in the last general election. Second, the State Government should consider offering various incentives and tax exemptions, and I also support the proposal put forward by the Honourable Air Putih in the Dewan Rakyat, namely that the Federal Government should establish a financial zone in the state of Penang to drive development and accelerate the growth of the services sector. I believe these incentives will also support investment in the state of Penang. Dato’ Deputy Speaker, the third is an important matter, namely that we must develop skilled and semi-skilled workers, because skilled workers are essential for us to attract foreign investment. Penang is the home of the E&E and M&E industries as I mentioned earlier, and Penang is also known as the Eastern Silicon Valley. Therefore, I request that the State Government give special focus to allocating larger allocations for education, training, development and skills programmes for the workforce in this state, to ensure the State Government remains competitive in the global market and attracts and retains young talent. For that reason, we need to give Dato’ Deputy Speaker a greater focus on STEM. Because since the possibility after the pandemic and COVID... We find that many school leavers now concentrate on the gig economy sector, such as riders, food delivery and so on. Although the gig economy sector does offer large wages and large commissions, for the future of the workforce and the future of the state of Penang itself, I see that we must look ahead and we need to review, because based on records from the Ministry of Education Malaysia itself, roughly 300,000 SPM school leavers do not want to continue their studies. I am not sure how many SPM school leavers in Penang do not want to continue their studies and so on. Nevertheless, I would like to know. What are the State Government's plans, specifically, for us to overcome this issue? Because it affects human resources, and there are many factors; perhaps these students are not interested in continuing their studies after SPM, perhaps due to poverty, family factors, or they are not interested in continuing their studies, or they cannot study in the field they want to pursue. So, we need a specific plan, particularly from the State Government, and if possible we should collaborate with other private sectors so that we can also ensure they are given skills (with permission), so that we can supply these workers for the future. Dato’ Deputy Speaker, we must also invest in infrastructure such as transport networks, energy and water supply, and communication technology to create an attractive environment and improve the quality of life of the people, making this state a more attractive place to live and work. And the LRT project that has been postponed for a long time must also be started immediately; I do not know what stage it is at now. Likewise, infrastructure projects such as highways must also be started immediately, and we must ensure those projects meet their implementation timelines. We know that this LRT project will cost more than 10 billion. I also wish to propose that the State Government request the Ministry of Transport to consider giving opportunities to local contractors to take part in the implementation of this LRT project later. Because priority should be given to local contractors involved in this mega project, and at the same time they can contribute to the state's economy. I also express my appreciation to the State Government for its success in negotiating with the State Government of Perak to secure treated water supply, to guarantee the sustainability of a continuous supply of water resources to domestic and industrial consumers in Penang. And regarding telecommunications, I feel 5G networks should also be expanded, because we often receive complaints that when in taller buildings in strata developments, sometimes our connectivity is not very good, and often when we pass through the second bridge, our friends also experience telecommunication disruptions. I feel the State Government needs to look into this matter.
Dato’ Deputy Speaker, the State Government must also build strong international relations; moreover, we must also explore new opportunities, with the expansion of this airport. The State Government should increase the number of direct flights from other countries. I have raised in my earlier debate the matter of direct flights from countries with large populations, and we see the economic opportunities that we can achieve. We also need to intensify the promotion of Penang at the international level. Dato’ Deputy Speaker, I also wish to ask the State Government about the proposal to build a new State Legislative Assembly (DUN) building. It was not stated in the 2024 Budget, so I would like to propose that the State Government give attention to this project, where I believe this august House has also been informed that this proposal has been raised for a long time. I sometimes feel sorry seeing the congestion faced by our fellow Honourable Members in this House, because it is cramped, and we also have to share sockets. Three (3) state assemblymen have to fight over charging phones and laptops. It is a pity, it is a pity for us...
Tambah socket…
We have to share, three people get only one, and sometimes we have to wait in turns for its use. Therefore I feel this is also a necessity when we see that we have a new State Legislative Assembly (DUN) building that is larger, with greater parking capacity and suitability. Dato’ Deputy Speaker, I wish to raise an issue that is often discussed, namely the issue of discrimination in housing rentals. We often hear complaints of discrimination and racial problems in the property market, particularly involving the Indian community. In particular, young people, students and those who have just married. When they want to rent a house from landlords and so on, they face difficulties because landlords do not want to rent to the Indian community and so on. I feel this issue and this complaint need to be taken into attention.
Therefore, I would like to suggest to the State Government, particularly the Honourable Perai, that if possible we establish a residential tenancy act to put an end to this issue of discrimination. And the renting of any property should not take into account ethnicity or racial background. Because we in the state of Penang are a state that embraces all segments of society and does not leave out any race.
Dato’ Deputy Speaker, I also want to ask about the proposed policy of 30% women's participation in the State Legislative Assembly, namely the Top-up Women Only Additional Seats (TWOAS). I want to know, "What is the status of the 30% of women State Assembly representatives?" through appointment, if the 30% quota cannot be achieved through the General Election. So today I also bring the voice of women in this House.
Dato’ Deputy Speaker, Batu Uban also wishes to know whether the State Government has any plans to add State Assembly seats. The addition of State Assembly seats is not for political reasons but for the interests of the people, demography and the groups of residents living in a particular area. Adding State Assembly seats will help improve living standards and facilitate the development of a State Assembly constituency based on social and economic interests. If the State Government has no plans in the near future...
I would like to request that the State Government also consider additional allocations for representatives of the people, to facilitate planning and to ensure assistance can be delivered to all the representatives of the people they represent. Do you not agree? (table thumping). For example, in Batu Uban I have roughly 43 thousand voters, and also a high number of residences, namely more than 131 strata buildings, and this does not take into account the new development projects that are being implemented and are in the planning process.
And also schools.
Macam mana
And also schools. Asking for a contribution from YB…
Yes, and also schools. So now I have around (11) schools in my area. When we have new plans, perhaps more schools will be added, and the population capacity will also increase. Therefore I feel the allocation we have now, taking into account rising costs and so on, is in my view insufficient. Therefore, I hope this additional allocation can be considered for the development and welfare of the people of Penang. Dato’ Deputy Speaker, the last issue I wish to raise is the approval for the construction of a workers' dormitory in the Teluk Kumbar area. This is also Dato’ Deputy Speaker's area. What we are worried about is that, although this project has received approval, most residents there are worried about the proposed construction, because the proposed construction area is right between residential areas that are already dense, and there are many low-cost houses, primary schools and mosques nearby. Residents are concerned that this may lead to social problems and also cause traffic congestion, and the greatest worry is that they will lose a good living environment for the local residents.
Therefore, I hope the State Government will reconsider this approval so that any construction involving this workers' hostel takes into account the issues or demographics of the area concerned. Hereby, I request to support. Thank you.
Thank you, Batu Uban. (table thumping). Okay, Members of the House. Today we adjourn (laughter) the sitting of this House, and it will resume at 9.30 a.m. tomorrow, Insya-Allah. Thank you to everyone who took part.
The House adjourned at 6.15 p.m.