Pulau Pinang · 29 May 2024
15th Assembly, 2nd session, 1st meeting · 481 turns · 51,171 words · official PDF ↗
ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.
Absent: Jagdeep Singh Deo a/l Karpal Singh (Datok Keramat), Dato‘ Seri Reezal Merican bin Naina (Bertam), Tan Hooi Peng (Seri Delima), Bukhori bin Ghazali (Pinang Tunggal)
(Opening)
Honourable Members. Honourable Speaker of the State Legislative Assembly.
Prayers.
Oral questions.
Honourable Members, I invite the Honourable Bagan Jermal.
Congratulations to the team of the Most Honourable Chief Minister and the EXCO members for answering more than a dozen oral questions successfully and excellently. Now it is the turn of the Bagan Jermal question. Question No. 17.
No. 17. What is the current domestic water consumption per capita compared with current non-domestic water consumption such as by industry, business premises and so on?
Thank you, Honourable Dato' Speaker. Thank you, Honourable Bagan Jermal, good. PBA has recorded average domestic water consumption per capita in 2023 of 284 litres a day. By comparison, the national average per capita water consumption in 2022 was 237 litres a day, while the national target is 180 litres a day. This shows that domestic water consumption per capita in the state of Penang is very high compared not only with the national average but with all other states in our country. We are the highest, Honourable Member. As for non-domestic consumption, water used by industry, business premises and so on is not measured on a per capita basis, but the total recorded in 2023 was 136,395,657 cubic metres a year, compared with domestic consumption of 183,725,917 cubic metres. Thank you.
Supplementary question, Dato' Speaker. What is the projection for water consumption for domestic purposes, based on population growth, and also for the non-domestic category, because we know that industry and manufacturing are developing very rapidly towards 2030. Thank you.
Thank you, Honourable Member, for the supplementary question. I do not have statistics that separate domestic and non-domestic use, but the information I have from PBA on total water use is that the projected water consumption for 2030 is 1,532 million litres a day. At present, our water demand is approximately 800 to 850 million litres a day, and towards 2030, with population growth, industrial growth and new islands and so on, we project 1,005 million litres. To meet this rising demand, PBA has already drawn up projects worth RM1.18 billion, which we call the Water Contingency Plan 2030, to be implemented over the next five years.
Apart from that, Honourable Member, PBA and the State Government are also exploring several alternative sources, because to obtain such a large volume, besides water treatment plants and existing sources, we need new sources other than rivers. We are perhaps exploring, for example, ground water, because there is now new technology that can extract water from underground more effectively and more safely, without causing land subsidence. And as the Honourable Member mentioned in the debate speech, seawater desalination can also be considered as one of the alternative sources. Besides that, we are also exploring coastal reservoirs and riverside storage ponds or reservoirs, known as TAPS. Finally, PBA has signed an MOU with IWK to explore sewage water, recycling or reclaiming sewage water, known as water reclamation, as one of the sources, as implemented in Singapore and other countries. Thank you, Honourable Member.
Honourable Member, supplementary question.
Sila.
Does PBA not see the Perai River as one of the water sources, when the Perai River is currently at Class III pollution level? Does the government or PBA not have any effort to resolve the pollution problem so that the water of the Perai River can be taken and used as a source to solve the water problem in our state?
Thank you, Honourable Sungai Dua. A good question. Actually, I mentioned earlier that we have the Water Contingency Plan 2030, under which several new water treatment plants will be built, among them at Sungai Muda, at Mengkuang, at Sungai Kerian, and another one that is being considered and is under study is the Perai River. We expect that we can obtain 132 mld from the Perai River, but the problem with the Perai River, the first point the Honourable Member mentioned, is pollution, but pollution is something that can be addressed. Another point is that the water of the Perai River is what we call brackish water, a mixture of seawater, salt water and fresh water. So the cost of treating brackish water will be somewhat higher, but PBA is in the planning stage and has already appointed consultants to prepare a proposal for us to use the water of the Perai River, precisely because, as the Honourable Member said just now, it is indeed one of the river sources we have in the state of Penang. Thank you.
Supplementary question, Dato' Speaker. Since the Honourable Member just said the air contingency plan involves RM1.18 billion, I would like to know how the State Government intends to obtain these funds to cover this cost.
This funding, Honourable Member, will come from various sources. Among them, we have the option of issuing sukuk bonds, and also the revenue we receive every year from PBA, to repay the loans we take, and among other methods, we will ask PAAB, Water Assets Corporation Berhad, to build those projects. But it is not free, Honourable Member; we have to pay it back. However, by using PAAB's assistance we can implement them simultaneously. For example, Sungai Kerian, PBA will do it, perhaps Sungai Muda we ask PAAB to do it, and for Sungai Perai the PBA proposal is to ask PAAB to take over and build the treatment plant, but as I said, PAAB does not work for free, we have to pay it back too. So that revenue we still have to find to finance all these projects.
Thank you. I would like to invite Permatang Berangan.
Honourable Dato' Speaker, my question is No. 18.
No. 18. What is the capacity of the Toh Alang Water Treatment Plant (LRA) and list the areas that receive water supply from this plant.
(a) How does the government ensure that pollution of the Kulim River does not affect the water quality from this LRA?
Honourable Member. Dato' Speaker, the current production capacity at the Bukit Toh Alang Water Treatment Plant is approximately 37 million litres a day, and the areas involved in supply from the Bukit Toh Alang LRA are as listed in the appendix that will be placed on the Honourable Member's table, because it would be tiresome to read them all, there are over 27, over 30, 40 areas. Honourable Member, monitoring is carried out in an integrated manner through several agencies and government departments such as the Water Regulation Division (BKSA), the Ministry of Health Malaysia (KKM), PBA, and all of them conduct sanitary inspections and periodic water sampling to ensure that the water quality of the Kulim River is in good condition and that its quality meets the standards set by KKM for drinking water. If the water quality is found to be at an unsafe level, we will stop the water treatment plant and an investigation will be carried out to identify the source of the pollution. To ensure that river quality is always at an optimum level and does not affect water quality for supply purposes, the Department of Environment also implements an environmental quality monitoring programme, namely EQMP, specifically for river water quality monitoring.
Under the EQMP programme, river water quality monitoring is carried out through in-situ and ex-situ sampling at automatic water quality stations located upstream of the water treatment plant intake, to obtain readings of the main water quality parameters. For the Kulim River, Honourable Member, this automatic monitoring station is located at Kampung Tun Sardon, approximately one kilometre from the Tok Alang intake. EQMP is also a programme that can provide early warning of pollution in this river, and requires action, investigation by the Department of Environment to identify the sources of pollution if it occurs. Thank you, Honourable Member.
Terima kasih.
Soalan tambahan.
Sila.
Is the water of the Kulim River pumped into the Mengkuang Dam and then channelled to the Sungai Dua LRA to be processed and used as drinking water for all the people of the state of Penang? And secondly, a supplementary question. Recently, on 18 February 2024, the Director of the Department of Environment (JAS) of the state of Kedah reported that the Kulim River was polluted with pig waste. Then the EXCO for Agriculture answered on 19 February that the pollution was caused by duck droppings, but whatever the case, the pollution still occurred and we are worried about this pollution.
What steps have we taken to resolve this pollution problem so that it does not continue and cause us, the people of Penang, to drink polluted water? You said just now that quality is being maintained, but if we can, we want to protect it before pollution happens. We must avoid it so that pollution no longer occurs. And I would like to ask what legal action has been taken against these illegal breeders who raise ducks in Sungai Lembu. Thank you.
Thank you, Honourable Member. Two good questions. The first asks about the Kulim River. Is it one of the sources for the Mengkuang Dam? The answer is yes. We abstract water from the Kulim River through the Mak Sulong Pump House to be put into the Mengkuang Dam, but this Mak Sulong Pump House can only operate during the rainy season, because it requires the water to reach a certain level before we can pump, since the water in the Kulim River is also used for irrigation. So it must follow the JPS guidelines, so when the water reaches a certain level we can pump it into the Mengkuang Dam. So we do not pump all year round.
As for the second question, the polluted river, pollution must actually be addressed at its source, Honourable Member. I think the Honourable Member is also aware that if we clean the river every day, but the source is still polluting the river, it will not solve the problem at all. So to address it at the source, in terms of enforcement, this can be done when complaints are received or when pollution is found to have occurred, and an investigation will then be carried out, and if we can identify the source, of course any existing laws can be used to take action against them. At the same time, in terms of legislation, we can also strengthen, as we have implemented the Pig Farming Enactment in the state of Penang, to impose strict conditions on pig farms, where they must implement a closed system, meaning that any discharge released from their farms must be treated first before it can enter the river. And besides that, as I said at the beginning of my answer, monitoring is carried out 24 hours a day, we have sensors placed at all intakes, close to the intakes and also at the plants, so that we control water quality before treatment. So if it is found that the parameters are too high or beyond normal, the plant will be shut down, we will temporarily stop it until we identify the source. Thank you, Honourable Member.
Thank you. Pengkalan Kota.
Soalan tambahan.
Pengkalan Kota.
Thank you, Dato' Speaker. My question is question 19. Thank you.
No. 19. Describe the allocations channelled to RIBI from August 2023 until now.
(a) State the method of implementation under the RIBI allocation initiative. Is it carried out fairly and equitably to all RIBI that require such allocations?
(b) Are the allocations channelled restricted to worship ceremonies? Can the allocations be used to upgrade RIBI?
Thank you, Dato' Speaker, and thank you to Pengkalan Kota for the question about RIBI. The Penang State Non-Islamic Places of Worship (RIBI) Special Trust Fund Committee has held meetings three times, yes. A total of 55 applications were raised and discussed by this committee, and among them 43 applications were approved. The total allocation certified and approved for all 43 applications is RM1,730,000.00. The detailed list of RIBI that have received allocations from the RIBI Trust Fund is in APPENDIX A, which will be placed on the Honourable Member's table after the oral question session. The RIBI Trust Fund Committee assesses and considers the approval of these allocations based on eligibility conditions complied with by the association, in line with the guidelines of the RIBI Trust Fund, namely TARIBI, such as feedback from technical agencies on land status, building status and association registration. B, the function of the approved TARIBI allocation is for repair, maintenance and site preparation as contained in the TARIBI guidelines, and it is limited to worship sites in the form of buildings provided by adherents for conducting worship ceremonies, activities and religious celebrations. Meanwhile, the scope of repair, maintenance and site preparation works involving civil, electrical and mechanical work covers a restructuring of the RIBI building. Second, repair of ceiling and roof leaks. Third, repair of wall cracks and tile floors. Fourth, repair of drainage systems. Fifth, repair and installation of fences. Sixth, replacement of wiring systems and electrical circuits, and eighth, emergency assistance. Thank you.
Terima kasih.
Soalan tambahan.
Sila.
Thank you, Dato'. We know that Penang has many RIBI that have existed for decades, and some of them for more than 100 years. About 100-plus years. However, they do not have recognition or permits from the authorities, as the Honourable Sungai Pinang mentioned just now, whether because of land status, assessment status, they have no status. So my question is whether the RIBI allocation mentioned earlier can be approved for RIBI of this kind. This is because many RIBI that have existed for a long time are facing building damage, especially leaks, and also structural strength that may pose risks or safety issues to adherents. This case is chronic and the government should examine it carefully. Thank you.
Thank you, Pengkalan Kota. So according to the application guidelines of the Penang State Non-Islamic Places of Worship (RIBI) Trust Fund or Special Allocation, the eligibility conditions just mentioned for applications require that they be registered with the Malaysian Registration Department (ROS), or established under the Malaysian Constitution Act or the Government Gazette, and must be registered in the Penang State Government e-RIBI System. Applications must also submit documents, valid land ownership status documents or approval for land use permission, as also outlined. However, applications with such issues raised by Pengkalan Kota will still be accepted, and we will process them and bring them to the meeting and deliberation of the Assessment Team Committee, which is made up of department officers who will be responsible for examining these applications and providing appropriate technical feedback. Such applications will be screened on a case-by-case basis, according to the issues or factors faced by each RIBI. Site visits will also follow. All applications by RIBI will be followed by site visits before we hold a meeting to consider or approve any application. So the site visit will be followed up and carried out by the HARMONICO secretariat as a verification action to examine, understand and survey the situation or problems faced by each RIBI. Thank you.
Soalan tambahan.
Batu Uban, please.
Thank you, Sungai Pinang. I would like to know that when we apply for RIBI allocations, sometimes it takes a very, very long time. And sometimes these places of worship need urgent allocations because of disasters and so on. So what action or procedure is taken to facilitate that these allocations can be channelled quickly? And secondly, regarding RIBI land, we know that some RIBI land, when handed over by developers and so on, is sometimes unsuitable, perhaps on a hill, a hilly area near Indah Water and so on. So, what is the explanation from the Honourable Sungai Pinang? Thank you.
Thank you from Batu Uban. Yes, if there are applications from RIBI due to an emergency. So we do have emergency assistance. So please submit those applications to us, and we understand these are emergency applications. We will hold a meeting to carry out a meeting so that we can examine and provide emergency assistance if eligible. Okay. And the second question, about the RIBI lands, has been raised many times. And if this one is before that. Before that. We have taken note, and this has also been discussed, because previously the developers did provide those plots, which were not suitable. I hope the Local Government will examine again when developers contribute the plot, and scrutinise the suitability of that plot. Thank you.
Thank you. Question 20 will be skipped. I would like to invite Pulau Betong.
Pulau Betong, Question 21.
No. 21. What is the total number of stray dog captures carried out in the Pulau Betong State Legislative Assembly (DUN) seat over the period 2022 to 2024?
(a) What action has been taken by MBPP to address this problem, which is disturbing the environment of the Malay community?
Thank you, Dato' Yang di-Pertua. To answer Question 21 from Pulau Betong. The total number of stray dog captures in the Pulau Betong State Legislative Assembly (DUN) seat from 2022 until April 2024 is as follows: in 2022 the total number of captures was 58 dogs; in 2023 the total number of captures was 64 dogs; and up until April 2024 the total number of captures was 22 dogs.
To answer question (a) here, I actually see that the question raised is what action has been taken by MBPP to address this problem, which is disturbing the environment of the Malay community. In fact, in my view this is not only among the Malay community but also among the local community. The State Government, through MBPP, is always alert and carries out capture and control operations against stray and abandoned dogs based on complaints received, where implementation is in accordance with the Standard Operating Procedure (SOP) that has been established. MBPP has two (2) teams named as the stray and abandoned dog capture squads, which are assigned to carry out capture and control operations in the North East District and the South West District. Among the challenges faced by MBPP is the difficulty of capturing these dogs in forested or hilly areas. A Memorandum of Understanding (MoU) was signed on 17 August 2017 between MBPP and Independence Aid For Protection and Welfare of Animals (IAPWA) to control the population of stray and abandoned dogs using the TNR method, namely Trap, Neuter and Release, which is more humane and effective in the long term by breaking the breeding cycle. This programme aims to achieve the goal that the MBPP administrative area is free of stray and abandoned dogs, in order to guarantee the safety, harmony and well-being of the public. In addition, the State Veterinary Services Department together with MBPP will carry out a Study on Public Perception and the Effectiveness of the TNR Programme for stray dogs in Penang in June 2024.
Terima kasih.
Soalan tambahan.
Sila.
Is it true, as understood, that those dogs were captured with NGOs and then released back? Then they were released again within a period, meaning that after being captured, they were let go and released back to the area where they were captured. Then I would also like to get an answer on how long the period of the memorandum made is. Okay, thank you.
I think for the question raised, please refer to question number 10, a written question from Pinang Tunggal, on how the government controls stray dogs in this state. Actually, it is more or less the same as what I want to answer here. The State Government, through MBPP and MBSP, controls stray dogs using the following methods, namely daily capture operations; joint efforts with the community and local non-NGO organisations through the Trap, Nueter, Release, Manage and Community Engagement Programme, where after we carry out captures we will conduct neutering, which is subsidised at private veterinary clinics, and also the involvement of both MBPP and MBSP in community service programmes with NGOs within their respective administrative areas. What this means is that after we capture these dogs, apart from having NGOs to keep these roaming dogs, we will also carry out neutering so that the population in the future can be reduced. That is the effort of the State Government so that we can monitor the abandoned dogs roaming in their respective areas. Thank you.
Supplementary question. Thank you, Dato'. Apart from dogs, the issue of cats also causes nuisance and disturbance to the public and certain parties.
That is not relevant to the main question.
Will the PBT also take action on the issue of cats roaming like stray dogs? Yes, the issue of cats, whether the PBT will take action against cats roaming, because it is more or less the same as the dog issue. And is the technique mentioned by YB Jawi earlier, which ultimately releases them back to the original site, effective? Because this issue is a recurring one and they are returned to their original place again, as mentioned by the Honourable Pulau Betong earlier. Thank you.
Thank you, former MBPP Councillor. I think this issue needs us to study it. Where roaming cats are concerned, the PBT, upon receiving ordinary complaints, do try to make captures, but it is not easy with cats. However, for cats and kittens, they do make captures, and I also often receive messages and complaints from the public about cats roaming in public markets. And do not forget, there is also one NGO devoted to cats that often contacts me, where they wish for us to help them carry out a neutering programme, so that the State Government through both PBTs provides subsidies to their organisation, particularly in Padang Tembak. I am not sure about Padang Tembak, but I did receive from that group that they have carried out cat captures apart from dog captures. For cat captures too, they want to rescue cats; there are abandoned cats that are injured, and they capture those cats and they bear the cost of treatment for the injured cats. Perhaps I will study what was raised by Pengkalan Kota, and if Pengkalan Kota is willing to make it a lead, as a foster father for this task force, I will proceed to hold a task force to look into the causes, because indeed after this sitting of the House, before this I met with a group of cat lovers. I have met them and considered the proposals from that NGO, and I have taken note. I thank Pengkalan Kota for raising this issue today. Thank you.
I seek an explanation from my side as a former Councillor, for the information of YB Jawi, as in fact, as a former Councillor. Thank you.
Already answered. All the former ones here, there are also former EXCO members seated at the back. We welcome you. Bagan Dalam, please, Bagan Dalam.
Good morning, Dato' Yang di-Pertua. My question is Question 22.
No. 22. What are the annual statistics on the usage of the Urban Transformation Centre (UTC) KOMTAR since it began operations?
(a) Does the State Government intend to establish a UTC in the Seberang Perai area, considering the larger population in Seberang Perai?
Thank you to Dato' Yang di-Pertua for answering the question raised by the Honourable Bagan Dalam regarding UTC KOMTAR. UTC at KOMTAR or simply UTC is a programme under the Ministry of Finance Malaysia (MOF) that offers the services of multiple agencies under one roof and operates beyond the normal office hours of Government. UTC Penang has been operating since 15 August 2020 at KOMTAR, Penang.
Since its opening until April 2024, UTC Penang has received a total of 1,211,721 customers, as per the following details:
In 2020, starting from 15 August, 81,771; in 2021 it increased to 192,332, even during Covid-19; in 2022 it increased to 346,399; while in 2023 it increased further to 428,074 customers; and for 2024, up until 30 April 2024, a total of 163,145 customers have used the services at UTC.
There are many factors that the Government must consider in establishing a UTC. Based on Clause 4 of the Guidelines for the Establishment and Management of UTC, when establishing a new UTC, MOF must bear the cost of alteration, upgrading of buildings, and provide allocations for the procurement of special agency equipment and other office furnishings, which involve quite large allocations. Meanwhile, once the UTC is operating, the Government must cover the rental and maintenance costs of office space for Federal agencies, as well as the operating costs of agencies at the UTC such as utility bills, overtime allowances for staff, and various related costs. MOF at this time is focusing on strengthening the existing policy and direction of UTC to improve the quality of service delivery, including the implementation of digitalisation in the public service. In addition, the consideration of establishing a new UTC must take into account the capacity of the relevant agencies to carry out the redeployment of existing officers without involving an increase in positions, which is among the main challenges faced by agencies. Therefore, taking into account the country's financial position and priorities, MOF is of the view that the existing 23 UTCs are sufficient and has no plans to develop any new UTC. Thank you.
Terima kasih.
Supplementary question, thank you to the Most Honourable Member for the answer just now. Okay, we take note that the population density in the Seberang Perai area is higher than in the area on the Island. So we face difficulties, especially for senior citizens and the elderly if they want to come to KOMTAR to carry out their matters, if the UTC proposal cannot be considered or takes time to be implemented, because from my side, I have also made a formal application directly to the Prime Minister and MOF. What is the State Government's proposal to centralise federal services or state services to facilitate matters for the people of Seberang Perai, and what efforts can be taken by the State Government to ensure that service delivery to the people of Seberang Perai, especially senior citizens, can be improved. Thank you.
Thank you to the Honourable Bagan Dalam for the supplementary question. It is indeed the current practice that State Government and federal offices are centralised in the respective districts, for example in Bertam, where many federal agencies have been established. At one time there was a relocation from the town of Butterworth to Bertam when the Prime Minister came from Kepala Batas, and we believe services can be obtained at the district offices which have been established in their respective districts.
Meanwhile, services from the Local Authorities do have branches apart from the head office; for example, PBA, which is beloved by all the ADUNs, also has operation centres in certain locations to provide services closer to consumers. However, we know that this also has its weaknesses, where it is not easy for senior citizens in particular to go to various places to receive services from the departments and agencies. Therefore, the direction towards digitalisation of government and private services, for example revenue collection at offices, State Government departments at KOMTAR, nearly all 23 departments have successfully begun receiving payments online, and this is also one method to make revenue collection more efficient. This is the way forward, and so we are indeed in a process of digitalisation reform. There are groups that cannot adapt to this trend, and indeed, for example, Digital Penang organises many classes of guidance to enable senior citizens to attend classes on using smartphone applications so that they too can carry out simple transactions online, so that this will be a way forward. But we know the Honourable Member has already made an application to MOF to hold a UTC in Butterworth or in Seberang Perai. I am pleased to inform that at one time a Rural Transformation Centre was established in SPS, but it could not survive and had to be closed some years ago. There was indeed an RTC in Seberang Perai; perhaps the customers were not sufficient and perhaps there were other constraints.
As for UTC KOMTAR, this project was in fact undertaken by a former Finance Minister, who imposed very strict conditions on the State Government if a UTC were to be established at KOMTAR. What I have answered may apply to other states, but for UTC KOMTAR, PDC, as the owner of the premises, is also responsible for carrying out alterations and sometimes providing certain equipment to bring the UTC to KOMTAR, and MOF will pay rent every month so that we get a return on what was paid upfront by PDC to establish the UTC at KOMTAR. So we have spent more than RM10 million getting the place ready. It should be MOF paying everything, but since MOF is from Penang, PDC was asked to collaborate to make the UTC at KOMTAR a success. Thank you.
Bukit Tengah, please.
Thank you, Dato'. My question is Question 23.
No. 23. State the State Government's achievements in attracting FDI investment, particularly in the semiconductor sector, from 2018 until the latest, and the State Government's next detailed plan to maintain Penang's position as the main strategic destination of the semiconductor industry in the Asia Pacific.
Dato' Yang di-Pertua, thank you to the Honourable Bukit Tengah regarding efforts to attract Foreign Direct Investment (FDI), particularly in the semiconductor sector. As usual, we are all aware that the State Government, through Invest Penang, is always actively engaged in creating a conducive environment to increase strategic investment. As a benchmark for measuring sector performance, the FDI value for the electric and electronics sector will be emphasised for the State of Penang.
Based on data obtained from the Malaysian Investment Development Authority (MIDA), the value of approved manufacturing FDI for the E&E sector for the years 2018 to 2023 is as follows: 2018 - RM1.5 billion, 2019 - RM9.5 billion, 2020 - RM4.2 billion, 2021 - RM73.5 billion, 2022 - RM5.2 billion, 2023 - RM53.3 billion. Perhaps the Honourable Member will ask why sometimes we announce, for example for 2021, what was actually announced as RM76 billion, but I state RM73 billion now, because the RM73 billion is specific to E&E, while the others may be other sectors including the services sector. So that is the performance we are proud of, to the extent that the Honourable Prime Minister, in his latest speech yesterday regarding the development of the semiconductor industry in our country, used the example of the State of Penang as an effort to be a springboard towards making Malaysia a semiconductor hub in this world.
Therefore, I have already given an answer on the first day regarding this matter, and I do not intend to repeat it. We always consider that the E&E and semiconductor sectors need to be given attention, and from the billions of ringgit announced in the Honourable Prime Minister's speech yesterday, RM25 billion as incentives. We also hope that InvestPenang, PDC and the State Government can help entrepreneurs in the State of Penang to gain access to these incentives so that we can strengthen our ecosystem in the State of Penang.
Terima kasih.
Supplementary question, thank you Dato'. Thank you to the Most Honourable Member for the answer that has been given, and I also took note of the statement issued by our Honourable Prime Minister yesterday, in which he stated that the Federal Government will allocate as much as RM25 billion to develop The National Strategic Plan For Semiconducters.
So, my question is, how, and before that I was also interested in what the Most Honourable Member mentioned about how we can also help strengthen the ecosystem of local companies, which I think is so very important. Because if we look at examples like Taiwan now, Taiwan is the biggest producer of semiconductors, 60-70% of producers worldwide, and also high-tech, high-tech chips, they control 90% of the market. So my question to the Most Honourable Member is, what steps will the State Government take to collaborate and cooperate with the Federal Government, for us to be able to take advantage of The National Semiconductors Strategic Plan to develop not only talent but also SME companies in Penang, the eco-system supporters of the E&E industry, to develop them into world-class SME semiconductor companies for the whole world. Thank you, Most Honourable Member.
Thank you to the Honourable Member for Bukit Tengah, who is concerned about the economy in the state of Penang. As the Right Honourable Prime Minister has stated, Malaysia wants to be a bridge, a bridge where we can help local companies that have expertise from local people who fill important positions in MNC factories, a bridge where we become a launchpad to attract investment from abroad that can use the expertise and facilities of the ecosystem here in Malaysia to develop this semiconductor sector. This is because we are indeed an important semiconductor hub in the world, and with the National Strategic Plan for semiconductors, we believe a more specific direction has already been outlined, and Penang is ready to play a role in making this National Strategic Plan a success, because we are indeed the state that is most advanced in terms of the semiconductor and E&E ecosystem in Malaysia. And we hope that, besides expanding this sector into an attraction for higher-value human capital and creating high-value job opportunities and boosting property development in the state of Penang, because industry usually has spillover effects on the economy including other sectors, especially the property, transport, services, recreation sectors and so on, this will boost development in the state of Penang. But there is just one shortcoming: most of the proceeds from this development are channelled to the Federation. So the time has come, apart from the incentives announced, for us, and I actually wanted to answer in the winding-up session, but I can draw attention now, to review the distribution system to the states in the Federation. This is not an unfamiliar matter, as some countries do practise it. If we could ask the Federal Government to return, from the taxes collected from the state of Penang, apart from projects, which is a different matter, 20 per cent of the taxes collected from Penang back to Penang, we already have more than one billion every year.
Because I have been informed that the Lembaga Hasil Dalam Negeri (Inland Revenue Board, LHDN) collects only seven to eight billion ringgit in taxes from the state of Penang, and other Federal taxes may be more than this figure. If 2 per cent of what is collected by the Inland Revenue Board (LHDN) is, say, 8 billion, 20% is 1.6 billion ringgit, which would certainly provide a very large space for us to run the state of Penang, including responding to requests from Telok Ayer Tawar as well. That is the hope: that with the rapid growth of the semiconductor development economy, we also thirst for important funds from the Centre to be returned to the states so that we can implement programmes and projects more effectively. Thank you.
Thank you. Sungai Dua.
Thank you Dato' Speaker, my question is question number 24.
No. 24. List the annual profit/loss of PBA from 2020 to 2023.
(a) What is the rationale for PBA raising water tariffs by up to 200 per cent, which burdens the people?
(b) Can water meter readings be done once a month so that leaks that occur can be detected earlier and the burden on the people when paying bills be reduced?
Thank you Dato' Speaker and the Honourable Sungai Dua. Dato' Speaker, allow me to answer questions 24, 32 and also 76 together, which all concern water tariffs.
Boleh.
Thank you Dato' Speaker. Honourable Member, the total profit of PBA, namely Profit After Tax, for the years 2020, 2021, 2022 and 2023 is as follows: for 2020 - RM34.21 million ringgit, for 2021 - RM44.03 million ringgit, for 2022 - RM77.89 million ringgit and for last year 2023 - RM34.32 million ringgit. Regarding the water tariff, Honourable Member, allow me to give some clarification,
The State Government has taken note of complaints regarding the increase in the new water tariff rates. For everyone's information, the last revision of the tariff for the First Band was implemented in 1993, 31 years ago, while for the other Bands there was also an adjustment, the last one in 2015, 9 years ago. In fact, the old water tariff rates could not cover PBA's costs for carrying out repair work, infrastructure development and also water supply operations, which are very much needed. I am confident many Honourable Members also agree with this; I have listened to the debates of all Honourable Members, and many agree that the old water tariff rates were indeed not sustainable… (with permission), Honourable Member. And it must also be remembered that the original tariff was at a very low rate, very, very low, the lowest in Malaysia. So, any increase in percentage terms will certainly sound high, Honourable Member. When we start from a low base and raise it, the percentage increase is indeed high, people say 100 per cent or more and so on, but we must look at it in terms of absolute increase.
Now, the average rate for the first 35 cubic metres, that is for Band 1 and the Second Band, is RM0.85 sen per cubic metre, compared with the national average of one ringgit per cubic metre. In other words, even with this new tariff increase, the state of Penang is still among the lowest states in terms of water tariffs in Malaysia. Moreover, for the information of all Honourable Members, almost half of all domestic water users in the state of Penang fall under the First Band category, paying the minimum bill of RM12.40 every 2 months with the new water tariff. In other words, Honourable Member, half of the people of the state of Penang only pay RM0.20 a day for clean water supply, RM0.20 a day, Honourable Member, for 2 months RM12.40. This is half of the water users in the state of Penang.
As for Second Band users, that is up to 35 cubic metres of water a month, for 2 months 70 cubic metres, users will pay in the range of RM27.00 up to a maximum of RM60.00. If we use a maximum of 70 cubic metres in 2 months, the bill is RM60.00 ringgit for 2 months, equivalent to one ringgit a day. Band 1 and the Second Band make up 78% of water users in the state of Penang. In other words, nearly 80% of water users in the state of Penang will only pay a maximum of RM60.00 in two (2) months, equivalent to RM1.00 a day. And here allow me to also give an illustration: when we say 70 cubic metres, 35 cubic metres. Perhaps people do not really understand. This 70 cubic metres is a lot, Honourable Member. Do we remember during the water crisis, when we brought large jumbo tankers from KL? 70 cubic metres is 70,000 litres of water, nearly two (2) jumbo tankers. How much water do we use in a house, Honourable Member?
Imagine a large mineral water bottle, yes, not a small one, a large one, Honourable Member. 1.5 litres a bottle. If we use 70,000 litres of water in two (2) months, that is equivalent to nearly 47,000 large mineral water bottles. I do not think any house can store 47,000 large mineral water bottles, Honourable Member. And if we buy that water at the market, say at Mydin, how much would we have to pay. I have checked on Shopee, not Mydin, Honourable Member; on Shopee, if we want to pay, if we want to buy 47,000 bottles, the cost is RM60,000.00. But we pay PBA, not RM60,000, Dato' Speaker, RM60.00.
So the State Government's view is that the water tariff of the state of Penang, which is still among the lowest in Malaysia, is a reasonable tariff. If it were not reasonable, the State Government would not agree. Not only the State Government, SPAN would not agree, and not only SPAN, the Malaysian Cabinet would also not agree, Honourable Member Dato' Speaker. And why, why is it necessary for us to increase the tariff? It is to ensure that PBA has sufficient cash flow to meet the needs of operations and also the development of water supply infrastructure. Here there are several projects we want to carry out. I mentioned them earlier. The Water Contingency Plan 2030, in which we want to build water treatment plants. We want to explore new water sources.
The Honourable Member for Sungai Dua asked for a water treatment plant to be built in Sungai Perai. The Honourable Member for Bukit Tambun, who has already left the House, asked during his debate for a water treatment plant in Sungai Kerian. We do want to build them, Honourable Member. They all ask easily, but how much does it cost to build a water treatment plant, Honourable Member. Money does not come from the sky. We have to find the money… (interruption) Water comes from the sky.
Find it from water.
But not money. The problem is that to build water treatment plants, we cannot pay with water, we pay with money. So, Honourable Member Dato' Speaker, I hope you understand. Apart from water treatment plants, we also want to build a 1,300 mm water pipeline across the Sungai Perai, which has just been built across the Sungai Perai. Additional 400 mld pipelines to increase the capacity of water conveyance from Mengkuang Dam to the Sungai Dua Water Treatment Plant. We have asked the Federation for this, but if the Federation does not give it, we will have to carry out the pipeline project and pipe replacement ourselves. This is the NRW issue, Honourable Member. Many Honourable Members here have raised the NRW issue, Honourable Member Berapit mentioned it. He said in Copenhagen, NRW is 6%, but Honourable Member Dato' Speaker, if we want to quote that figure, we must give a clear and full picture. I want to ask Honourable Member Berapit, does the Honourable Member Berapit know how much the water tariff is in Copenhagen? The answer is RM50.00 per cubic metre, Honourable Member Dato' Speaker. In Penang it is less than one ringgit, 50 times difference. We want to reduce NRW in the state of Penang, we can do it. I am confident that if PBA can charge RM50.00 per cubic metre, we can also fight this 6% NRW, Honourable Member. It is not a problem. But with the water tariff rate we have, how can we do it? Replacing water pipes in the state of Penang requires RM1 billion ringgit. If we want to reduce our NRW, what we can achieve is only 150 million, which the YAB CM, as Chairman, has approved. Even so, we can reduce it a little. But
if we do not need to mention Copenhagen, Singapore too, how much is the water tariff there? RM10.00 per cubic metre. 10 times. If we want to reduce NRW, we can, if we want to build new infrastructure, build water treatment plants, we can, Honourable Member Dato' Speaker, we can, everything can be done. But money… (interruption). So we need this water tariff. I hope everyone understands. This is for the future of the state of Penang.
The Honourable Member for Bukit Tambun has come in. (interruption) Asking for a water treatment plant… (interruption). It is easy for us to ask, Honourable Member Dato' Speaker, we want this, we want that, we want to change this, but that money must still be found. Yes. And the water tariff is one of the mechanisms to generate revenue for PBA, and this revenue will be reinvested in infrastructure and in PBA's daily operations, Honourable Member.
Second question, Honourable Member Dato' Speaker, Dato' what is this, Sungai Dua asked about billing. In fact PBA has carried out an analysis on monthly billing and also once every two (2) months, and in fact we found that there are savings if billing is done once every two (2) months. This is because we do it on a pro rata basis, Honourable Member Dato' Speaker. Let me give an example so it is easy to understand. For example, a customer uses in the first month, say they are not at home much that month, and only use eight (8) cubic metres of water, and in the second month perhaps during Raya or something, they use a lot, 38 cubic metres of water. So for the first month they will be charged RM6.20 and for the second month RM36.16. The total is RM42.36.
But if under the two-monthly billing system, we will average it. PBA will average it and the bill will only be RM31.82. This means there is a saving of RM10.54. There are various scenarios that we will show in the attachment that will be given to Honourable Member Dato' Speaker, but from… (interruption) there is no water. The conclusion, Dato' Speaker, the conclusion is that because PBA practises pro rata, or we average the bill, it is in fact a saving for consumers. Nevertheless, with the implementation of smart meters that PBA is currently implementing, once smart meters are installed, customers can choose whether they want to be billed monthly or once every two (2) months.
So that option will be given to users. InsyaAllah. Finally, Honourable Member, to answer the Telok Air Tawar matter. The initiatives implemented by the State Government in helping the hardcore poor and B40 to settle PBA bills are the rebate for the poorest people's housing project, the family-friendly rebate for large families, the KAMPUL loan for advance payment for meter and water pipe connection, water leakage rebate, instalment payments and also subsidies for domestic users. A subsidy of RM116 million for the year 2023. Honourable Member, even with the new tariff rates, PBA will still subsidise domestic water in the state of Penang. So with what bill, this new tariff is not that we can make such a huge profit. We are still subsidising.
And this subsidy in fact reduces PBA's profit, and this subsidy also takes money from the funds that could be used for pipe replacement. So but
we also understand. We want to ensure the water tariff rate in the state of Penang is not too high, we are still competitive, among the lowest. So to ensure that, yes, a decision has been made to raise the tariff, but it is still not high even though the percentage looks big, it is still reasonable as I have explained earlier. Thank you Dato' Speaker.
Terima kasih.
Soalan tambahan.
Sila.
My question is whether PBA can give a special rebate because, what's it called, after the change in value, there was strong pressure which caused many, what do you call them, tap heads or pipe heads in the Sungai Dua Utama area and in the Sungai Dua area to come off, and when they returned from work, the floods had completely filled their houses. This means a lot of water came out, and also another matter concerning water leaks that cannot be detected. For what reason? Because these water pipes, in the houses built in the past, when they were built, were fitted with beams. So leaks in the beams cannot be detected. So with heavy water usage, there are bills, what's it called, users whose bills reach over RM1,000.00, up to RM9,000.00, up to RM11,000.00, meaning a lot. So when it is time to pay, people naturally say, what a large amount, and with the situation or incident that happened after the wharf change, people say, what's it called, the pipe in Sungai Perai also leaked. If the pipe in Sungai Perai also leaked, the pipes in the houses must certainly be experiencing the same problem. Can PBA, what's it called, give a special rebate.
Secondly, regarding the water-saving surcharge. Sometimes there are houses with many people, many people, and there are madrasahs that were not registered, and previously the water meter was under the name of the madrasah. Of course many people use it. Likewise with markas, their usage is also high, but the water-saving surcharge is imposed on, what's it called, premises where many people use water. So, what steps have been taken by PBA and also the government on this matter. Thank you.
Thank you, Honourable Member for Sungai Dua. Regarding this water leakage, if we follow the Act, it provides that any leakage before our meter is the responsibility of PBA or the water operator. And any leakage after our meter is the responsibility of the consumer. But I think that, case by case, appeals can also be made. We also receive appeals case by case, and we can look at whether any rebate or anything else can be implemented, but if we follow the law, it is indeed the consumer's responsibility.
Yes. So we must also ensure that the pipes in our homes do not leak. If leakage does occur, we can do this, but if bills of thousands of ringgit arrive that people cannot afford to pay, we have an Appeals Committee in PBA, where one must write a letter and make an appeal, Honourable Member. Perhaps the Honourable Member can also help any voters in the Honourable Member's constituency to write letters to PBA. As for the issue of a special rebate concerning the incident during the installation of the valve, we do not have that, and at the moment there is no plan, but later I may be able to discuss with the PBA management to see how many cases occurred. Perhaps if the Honourable Member has information, the Honourable Member can inform our side. We can see whether these cases can be helped or not. Thank you, Honourable Member.
Terima kasih.
Thank you, Dato' Speaker. Supplementary question.
Batu Lancang
Thank you to the Honourable EXCO member, who explained at length just now. I think the comparison made by the Honourable EXCO member was between a Mercedes and a Myvi. In my view, if we are talking about mineral water and raw water, the comparison is between a Myvi and a Mercedes-Benz.
Treated water is drinkable.
I still remember PBA once said that water that enters the house has to be boiled. It is not guaranteed to be drinkable. We have to boil it first, or better still, install a filter outside first. Have you seen it in the press? You have, right. That is the difference. Here I want to say that complaints from the people, we do hear them. All of us as representatives of the people here, more than 27 complaints were debated over these two days, and we clearly see the objection to this sudden increase. We do not object to saying tariffs cannot be increased. They can. But please don't make it so expensive, 200% all at once. Usually we all agree, but we ask for the increase to be phased. Don't give the burden, give such a heavy burden to the people; we all receive the people's complaints. They certainly do not object. Here too we do not object, we just want to ask for a rebate.
Not debate. Honourable Member, supplementary question.
We are asking for a rebate. Not that I have a supplementary question. Because this has already been explained, there will definitely be no more winding-up later.
There definitely isn't.
I have to say it here. We are only asking for a rebate. At least a rebate to the public. Thank you.
Thank you, Honourable Member for Batu Lancang. Firstly, I want to say and inform the Honourable Member for Batu Lancang that the quality of water from PBA is among the best in Malaysia. It can be drunk straight from the tap. I have seen our PBA CEO drink straight from the tap, Honourable Dato' Speaker. Next time I will ask the CEO to make a video of himself drinking from the tap, and we can send it to Batu Lancang. I would also dare to drink it; it is definitely safe, because we have water monitoring. We have sensors everywhere, throughout PBA's entire pipe network, where water quality is guaranteed. So I think the comparison, no, is not a Mercedes versus a Myvi, Honourable Dato' Speaker. We are discussing water that can be drunk. In other words, the comparison is between like things. The second matter is the issue of a tariff that can be implemented in phases. Actually, the implementation of this tariff, if the Honourable Member takes note, is implemented throughout the country, because water tariffs are ultimately decided by the Cabinet of Malaysia. It is not PBA; tomorrow it wants to increase, it increases its tariff, or next year it wants to increase and it increases. It has to go through a difficult process. We must apply first, PBA must table the OP, yes, to SPAN, SPAN must approve it, bring it to the Cabinet, and perhaps there will also be amendments, and then the Cabinet will approve it. It actually takes a long time. The tariff we are implementing was actually requested in 2015, and then only just approved, not 2015, 2019, and only just approved in 2024, or approved last year to be implemented in 2024.
So it actually takes years to implement a water tariff, what is it, the addition of water tariffs. And Honourable Member, I am not against it at all if we want to increase water tariffs in phases and not wait until 30 years later to do it. I agree with that, and perhaps in the future we will practise water tariff increases in phases. I did not say every year, Honourable Member. But perhaps future increases will go up a little at a time, in phases, and not suddenly, waiting 30 years before doing it. That I agree with. Thank you, Honourable Member.
Supplementary question. Just now it touched on Berapit. Thank you, Honourable Member for Tanjong Bunga. Given such an excellent explanation in this oral question, through the explanation from the Honourable Member for Tanjong Bunga just now, I have now learned about a broader picture, so I thank you. But here is my question: do you agree that PBA's communication has not been done well? Because this water tariff increase was only done through PBAPP's own social media or through the press conference of the Honourable Chief Minister. I think this is too passive, to the extent that the Honourable Members in this august House had to stand up in this sitting to object. And just now you touched on NRW, water treatment plants and pipes that require funds, and we understand that, but here I want to know whether effective communication from PBA itself also requires a high budget? If not, how can we achieve communication that is much better so that we do not have to object in this House, thank you.
Thank you, Honourable Member for Berapit. On this one, I actually agree regarding PBA's communication. It's not that it is wrong to say it does not inform the public, but it only uses traditional channels. We are already in the 21st century; people no longer read newspapers, people no longer read press statements, people watch TikTok, WhatsApp and so on. Perhaps PBA needs to improve in terms of communication, using video, using animation, using infographics and so on, in line with how people today receive information. I think, I am confident, that if we issue a press statement, people won't go viral on WhatsApp, but if we make videos and so on, it may receive a better response from the public. So this criticism, I will inform PBA so that communication quality can be improved. Thank you, Honourable Member.
Soalan tambahan.
Sila.
Yes, about Tanjong Bunga mentioning Telok Ayer Tawar 32 just now. I live in Sungai Dua; my question was number 32 earlier. Thank you, Honourable Member for Tanjong Bunga, an excellent question, with wit and humour. Now, I want to ask… (interruption).
PBA pays PBA, then Tanjong Bunga will pay.
The Honourable Member said just now that this water is the best in Malaysia, Penang. Honourable Member, do you monitor the water in… It indeed comes out of PBA, the best quality, but when it enters the pipe system to houses, the system has become not good. Why? The pipes are old; a house of 100, a house of 60 years, a house of 40 years, their pipes have indeed rusted. So the water becomes not good. This is something PBA must study. So we cannot say best, half best, just about best. This is what I see, especially in the flats. In the flats, when PBA has raised the surcharge on water for consumers, PBA must look at the water pump system in these flats because the pressure does not reach the fifth and sixth floors. It happens often in Telok Ayer Tawar. Even in the middle of the night they phone the YB: YB, there is no water, fourth floor, fifth floor. Today I ask PBA, EXCO, Tanjong Bunga, to study this matter. I have reported this many times already: come in a week, it'll be fixed tomorrow; come in a month for repairs, it'll be fixed tomorrow. Thank you, Tanjong Bunga.
Thank you, Honourable Member for Telok Ayer Tawar. I think from the Honourable Member's question just now, the Honourable Member also understands that, to be honest, the issue is not the quality of water coming out of PBA. Most of the problems lie in internal pipes that are worn out and old. This becomes a problem not only in terms of quality, perhaps rusted pipes and so on, but also for old flats that do not have a suction tank system, and that do not have a pump system to raise the water pressure upwards. So recently, at the PBA Board of Directors Meeting, PBA has approved a fund of RM2 million that will be given to the Housing Board, which is not here, for any public housing that can apply for upgrading, replacement of pipes or suction tanks.
So this is a contribution from PBA to help, but it is not PBA's responsibility to go and repair pipes inside people's houses. That can be done by the housing authority or the State Government. So they can apply through the channels of the State Government, but PBA also plays a CSR role by giving a large contribution, RM2 million, Honourable Dato' Speaker.
Dato' Speaker. Thank you to Tanjong Bunga for the lengthy explanation. According to the answer just now, in 2020 the profit was more than RM30 million, then RM44, RM77, and in 2023 it was RM34 million. What is the profit projection for 2024 with this surcharge increase? That is the first. Second, in SPS, two weeks ago the COO met all the ADUNs in SPS and showed the NRW hotspot areas, which means there is leakage or water theft. At the same time, Mukim 5 SPS is facing a water shortage. For me, the water shortage has lasted about 6 years. What is PBA's action on this? In one place there is indeed water loss, in another place there is no water at all.
Yesterday I just received a complaint: opposite Hospital Sungai Bakap, that is Taman Rasa Ria, the place of the former ADUN for Sungai Bakap, Doktor Amar, will have no water from 6.30 to 9.30 at night. What is this, what is PBA's action? And third, for roads we always receive allocations from the Federal Government to upgrade in every state. Regarding the upgrading of water pipelines or the replacement of water pipes that are more than 40 years old, are we entitled to receive allocations from the Federal Government? As was recently announced by the Prime Minister, if I am not mistaken, from Sungai Perak to Kerian will receive allocations from the Federal Government.
Therefore, is Penang entitled to claim the upgrading of the main water pipelines in Seberang Perai, or is the whole of Penang entitled to claim allocations from the Federal Government? That is all.
Thank you, Honourable Member for Bukit Tambun. The issue is that the Federal Government does indeed provide funds for pipe replacement, but its conditions are rather strict: any operator must show a reduction of NRW by 2 per cent before we can receive money from that fund. For states with very high NRW, for example Kelantan and Pahang and so on, where NRW is more than 50 per cent, reducing it by 2 per cent is easy. But for the State of Penang, where NRW is already low compared with other states, reaching that 2 per cent is actually quite difficult. So that is an obstacle in terms of the funds provided by the Federal Government.
The Honourable Member asked earlier how much the new water tariff is expected to add, RM89 million, but even with that additional profit, we still expect to provide water subsidies of, if I am not mistaken, RM36 million, RM70 million more, less than this year, last year when we subsidised RM117 million, but we will still provide subsidies.
Honourable Member, what else did you ask earlier? SPS, yes, yes. For SPS, as the Honourable Member may also know, there are several short-term projects being implemented to overcome the problem, especially in Mukim 5, Honourable Member. For example, the dissolved air flotation water treatment plant at Bukit Panchor of 10 MLD, RM18.6 million, completed on 5 December; a pump house at Permatang Tinggi of 16 MLD, RM800,000.00; a mobile water treatment plant at Taman Sungai Duri of RM680,000.00; a suction tank at the Taman Widuri pump station of RM735,000.00; a suction tank at the Taman Wessley pump station, also RM493,000; a compact water treatment plant at Sungai Kerian of RM6 million, another compact water treatment plant also at Sungai Kerian of RM4 million; both of these compact water treatment plants are expected to be completed by the end of this year.
What I mean is that in SPS, there are hotspots where PBA has identified NRW occurring, and some places have no water at all. If we could resolve the NRW issue, perhaps it could to some extent resolve the water shortage in some areas.
I am confident PBA has it. But I do not have that information. Later we can discuss it with the management. Thank you.
Speaker.
Thank you. Honourable Member, your time is up.
Two minutes. Two minutes. One minute. One minute.
Winding-Up by State Executive Councillor on the Motion of Thanks for the Speech of His Excellency the Yang di-Pertua Negeri of PenangMotion
Wait. It's all right. That's just how we do it. Honourable Members have the right to ask anything. But the Honourable Members and the Honourable EXCO members must answer here, yes. So, whatever was not answered in time, there will be an opportunity in the winding-up session. Those already answered need not be repeated.
Honourable Members, the one hour and 30 minutes for oral questions has now ended.
Dato' Speaker, the answers to the oral questions that have been answered just now will be placed on the desks of the Members who asked them and will be included in the Official Report.
Thank you, Honourable Chief Minister. So, Honourable Members, after we have witnessed the debate session, we are now in the winding-up session on the motion of thanks to His Excellency Tun, who graciously delivered the address in this House on 24 May. And I invite the Honourable Member to take part in the winding-up session. Please, Pantai Jerejak. Keep to time.
Bismillahirahmanirrahim. (recitation of prayer). Salam Sejahtera, Salam Penang2030, Salam Malaysia Madani.
The canary bird perches on the areca palm, Perching until the early hours of the morning; Thank you is extended to the Yang di-Pertua Negeri Pulau Pinang, For the opening speech delivered the other day.
I would also like to record my highest appreciation to the Honourable Members who took part in the debate session in conjunction with the Opening Ceremony of the First Meeting of the Second Session. Likewise, I would like to extend my highest congratulations to the students who obtained their SPM results, especially the students of Pantai Jerejak, in the Pantai Jerejak area of my constituency, and generally in the constituencies of the state of Pulau Pinang, and also generally in our country.
On this occasion, I would also like to record my condolences to the entire family of the late Honourable ADUN for Sungai Bakap, who has left us. I would also like to extend congratulations on performing the haji to all my friends and the people of Pantai Jerejak who have been called to perform the haji. Pray that I too may be called in the times to come. Dato' Speaker, before I continue my speech or wind up this session. First, I would like to refute the unsound debate by the Leader of the Opposition, because at the outset he sneered at the Prime Minister by putting forward a negative and also false narrative. I would like to ask the Leader of the Opposition, as was said, or what was said in his speech. I want to ask, the question is whether the RUU355 Act is still being championed by the Leader of the Opposition. Previously, we saw the Leader of the Opposition and the Opposition team mention RUU355. But now, they are not championing it. Just as I said earlier, at the outset the Leader of the Opposition's debate sneered at our Prime Minister by making a wrong narrative. Likewise, regarding the Opposition, which initially championed RUU355, but now it is not heard.
Dato' Speaker, it is as clear as daylight that day by day we are approaching the threshold of 2030. My modus operandi, particularly in the MMK for Agrotechnology and Food Security of Penang, is to achieve a high level of self-sufficiency, regardless of social strata, holistically, with food supplies always sufficient and not wavering under the pressure of current trends. In conclusion, I would like to extend my thousand thanks to the State Government for approving the proposal to establish a locally branded rice, Cap Feri, which to some extent helps the B40 group and, throughout, helps the people of the state of Penang. Thus, arising from this, a Penang State Rice Steering Committee was established to monitor implementation from the beginning until now, and with the existence of this Cap Feri rice, it indirectly answers the questions of the Honourable Member for Sungai Dua and also the Honourable Member for Permatang Berangan. For decades, scientists all over the world have endeavoured to find solutions to increase the rate of photosynthesis so that plants can grow faster and healthier. The solution lies with Dr. Suraya Abdul Rashid, a Malaysian, a graduate of Imperial College London. The State Government has collaborated with her team, namely Dr. Suraya Muhammad Abdul Rashid, in applying the results of her research in the state of Penang, to increase yields faster and healthier. The State Government places primary focus especially on paddy cultivation and also on kontan cultivation. Our pilot project will be channelled to participants who take part in the Malaysia Good Agricultural Practice Certification Scheme, namely (myGAP). This is what is referred to as Agrotechnology: a combination of technologies that we adopt together with agriculture, animal husbandry and also fisheries to increase the yield and quality of agriculture in our state.
Next, the question of the Honourable Member for Sungai Dua concerns the Temporary Occupation Licence (LPS). According to Schedule 2, the Penang Land Rules 2021…(with permission), have stated that such applications will be processed and a fee will be imposed, and such applications will not be refunded whether they are approved or rejected. This has been practised not only in the state of Penang, Dato' Speaker. It is practised in other states, for example in the state of Kedah, where a fee is also imposed for this LPS process. For the information of the Honourable Member for Sungai Dua, the LPS application adjacent to Lot 4003 in Petak B, Mukim 16, Seberang Perai Utara, was rejected on the basis of comments and remarks from the Seberang Perai City Council (MBSP) and also the Department of Irrigation and Drainage (JPS), because it is located at Sungai Perai. InshaaAllah, if applications at other locations are deemed worthy of consideration, I and also the government departments and agencies will consider them, especially in the aspect of agricultural land.
Mohon mencelah.
Silakan.
Is Pantai Jerejak not aware that along this river there are farmers carrying out, what's it called, kontan farming? So, the application is an application for kontan crops. Kontan crops are not permanent crops, not big crops. If there is acquisition, if we want to carry out any work related to the river, then the relevant party may do so. But, we see that in some places there is no problem carrying out agriculture. But, in certain areas it is not allowed. Yet I went down and saw that area. The area is big, exceeding the limit of what's called the river reserve. So, surely they cannot be allowed to apply? That's why they applied. So, that's why I think this, what's it called, Pantai Jerejak, perhaps if you are keen to see that area, you could come down with me so that we can meet the farmers and see the area.
Okey.
So that what's the rationale of that action, what's it called.
Okay, yes. Thank you, Dato' Honourable Member for Sungai Dua. In Shaa Allah, I will scrutinise the application. I am not rejecting it at all, because it was made in a large meeting, a big one, attended by various agencies and departments. You may make an appeal, I ask to make an appeal. In Shaa Allah, if possible, I also want to see this land approved for the agriculture sector. No obstacles. For me, if it can be considered for an appeal, I hope the government agencies and departments will grant approval, because this land is Lot 4003, Mukim 16, Seberang Perai Utara.
In response to the question of Permatang Berangan, on the issue of pest attacks in agricultural areas, namely paddy fields: for this issue, the State Government would like to thank the Federal Government, because nearly RM500,000.00 this year, the Federal Government, through the Ministry of Agriculture and Food Security (KPKM), has agreed to be channelled to the State Government through IADA to implement the Smart Agriculture Project using IoT technology for paddy cultivation in the paddy granary areas throughout the state of Penang. Furthermore, this project at the same time can provide information to paddy farmers about pest attacks and disasters through an early warning system (EMS), and can also help monitor the paddy according to the water supply schedule and the mechanical activities of the farm. We believe and are confident that with the implementation of this project, which uses IoT, it will to some extent help paddy farmers in tackling this problem. Honourable Member for Sungai Dua, Honourable Member for Permatang Berangan also raised the issue of expensive paddy seeds. I want to stress that in our country there are three sectors. The first sector is the Local Government sector, the second is the State Government, and the third sector is the Federal Government.
Regarding certified paddy seeds in particular, ek, it falls under the jurisdiction of the Federal Government. I am in the State Government sector, the Honourable Members are in the State Government sector, and below us is the Local Government sector. All matters concerning paddy seeds fall under the jurisdiction of the Federal Government. However, I am not washing my hands of the responsibility to ensure that this seed issue can be addressed. Through the MMK under my portfolio, I have formed a Paddy Industry Steering Committee that brings together almost all agencies under the State Government and also under the Federal Government, such as the IADA, the Department of Agriculture, and the Padi and Rice Control Department (KPB), to overcome the seed problem, this seed issue. In Shaa Allah, in this committee, we will meet monthly to obtain information on the problems below, including the questions of the Honourable Members, so that we can overcome the seed problem.
Here, I beg to interject. Regarding what.
One minute. Just one minute.
Regarding what was said by Pantai Jerejak just now. What drastic action is there regarding this paddy seed issue, because now paddy farmers are about to start planting. They want to start this, what's it called, paddy cultivation. Right, so what drastic action can help them?
As I mentioned just now, we have implemented, or set up, the Paddy Industry Steering Committee, comprising various agencies under this, to resolve this problem. And I stressed earlier that the authority, the authority which rests entirely with the Federal Government. If the Honourable Member for Sungai Dua were to send me into this Parliament, In Shaa Allah I would try to bring up this issue and also resolve it urgently. No, I did not say that.
No, Pantai Jerejak…(interruption).
I don't want to prolong the reason. …(interruption).
Speaker, (with permission) Speaker.…(interruption).
The authority of the Federal Government…(interruption).
Him, anyone can answer. That one…(interruption).
Dato', no, no. I…(interruption).
But how can we help? Now, I am asking about the matter.
I mentioned earlier, I have set up the Paddy Industry Steering Committee.
Yes, if you set up a committee…(interruption).
Didn't you hear? There is…(interruption).
In the near future, they are going to plant already…(interruption).
Surely I am not going to go and shake…(interruption).
That is the answer, like that. (unclear).
I mentioned it just now.
The Honourable Member for Pantai Jerejak.
Paddy Industry Steering Committee…(interruption).
Sit down. Sit down. …(interruption).
In discussing the paddy seed issue…(interruption).
Pantai Jerejak, please sit down first, okay. Telok Ayer Tawar…(interruption).
But my floor, Dato' Speaker …(interruption). .
Can't. Can't…(interruption).
Honourable Member for Pantai Jerejak…(interruption).
Yes, I know your floor, but you have to listen to me. Sit. Sit. Sit a moment. Whoever is winding up, I asked you to wind up in the best way possible. Whoever asks questions, ask in a good manner. But every time one person already… Don't…(interruption).
Ha.
Sit down first. Sit down a moment, ha. Whoever is winding up, I asked to wind up in the best way possible. Whoever asks, ask in a good manner, but every time one person already. Don't have several people standing in their places. It's hard for me to control, okay. Pantai Jerejak.
I mentioned earlier, I wound up respectfully and politely, and I also give room to any individual or Honourable Member to interject, but if this is the way it is going, I also cannot control it within this very limited time. Following that, the Department of Agriculture has also encouraged agricultural stations under its supervision that are involved in paddy planting activities to implement seed farm programmes. Accordingly, the State Government has identified new farmers to manage seed farms in the state of Penang. New plots, for example at the Bumbung Lima Agricultural Complex with an area of 24 hectares, will run in the second season of 2024, namely May, which is now. As for other plots, the paddy plots at the Bukit Merah Paddy Station, Permatang Pauh, will be registered as seed farms, and the planting programme is expected to start in the second season of 2025, namely May 2025, indirectly increasing BPS production and subsequently helping to control BPS prices. BPS means Benih Padi Sah (certified paddy seed). These are steps taken by the State Government; it is not that we are doing nothing.
Dato' Speaker, next, answering the question of the Honourable Member for Penaga on the same issue. I want to say again about these three sectors: we have the Local Government, we have the State Government, and we also have the Federal Government. Let me read, I will read what has been done by the Padi and Rice Control Department (KPB) under KPKM. The steps taken are: first, monitoring and strictly controlling the approval process for farms and laboratories for the 12 certified paddy seed producers, based on the SOP set by the department and agencies, before this BPS is sold to paddy farmers. Second, conducting continuous intelligence and enforcement to ensure sufficient BPS supply, as well as ensuring all parties comply with the BPS price stipulations. And finally, the third, advising paddy farmers or any interested parties to lodge complaints directly with KPB branches, State KPB offices, or through agencies such as the Department of Agriculture, the Muda Agricultural Development Authority (MADA) and the Farmers' Organisation Authority (LPP), if they face problems related to seed supply and seed issues. Besides that, in…(interruption)
Pantai Jerejak, just a little, can?
If I say no, how?
Tak boleh?
Boleh, boleh.
In this House, to discuss, if it is not allowed, can't, better we go out. Ha... Honourable Member for Pantai Jerejak, these seed plots, is the Agriculture side reviewing this, especially what we see at Simpang Ampat and Permatang Buloh? The application to make seed plots, and to do it twice, became a furniture factory. What action has the Agriculture side taken, Agriculture EXCO? Thank you.
The question just now, what… seed plots that have been applied for?
It has now been done two or three times.
By whom, who applied for this, Honourable Member?
This is by the private party, to make paddy seed plots, and it must be approved by Agriculture.
Okey.
He applied to make seed plots. But he did it about three or four times, and what came out were seeds.
And he directly made a furniture factory?
And then made a furniture factory.
Okay.
Apakah tindakan?
Give me the information. In Shaa Allah, the Department of Agriculture will take immediate action.
Thank you, Honourable Member.
You're welcome. In answering the question, answering back the questions of the Honourable Member for Sungai Dua and also the Honourable Member for Permatang Berangan regarding the State Government's initiatives for paddy farmers, especially in the state of Penang. This year, the State Government together with IADA has delivered an initiative of RM531,000.00 for the Soil Conservation and Soil Fertility Enhancement Management Project, and this incentive has been given to the District of Seberang Perai Selatan amounting to RM185,400.00, the District of Seberang Perai Tengah amounting to RM156,800.00, and to Kelompok Padi Pasir Gebu amounting to RM188,800.00. I want to say here that the State Government has never taken the Opposition areas lightly, and I want to say once again the efforts of the State Government towards areas, especially Opposition areas, as I mentioned earlier: Seberang Perai Selatan and also Seberang Perai Tengah, including in the Penanti area. Not that I am mentioning the Sungai Dua area, Leader of the Opposition. I want to mention Seberang Perai Tengah, such as Penanti, Seberang Jaya and others. The efforts made by the State Government are hoped to lead to these Opposition areas shifting towards the State Government in the upcoming election. Not enough with that, the allocation…(interruption)
What is this. Even responsibility, must there be something in return?
…amounting to RM169.000.00…(inaudible)
I apologise, Pulau Jerejak. Please answer the question, not a question for campaigning or for shifting allegiance. Please, Pulau Jerejak. Don't provoke him to the point of offence. Can't. Pulau Jerejak, please answer the question, not his question like that.
Let me answer. Let me continue with my speech. In addition, an allocation of RM169,500.00 has also been given for the large-scale paddy management project to two main cooperatives in North Seberang Perai. Ha, another opposition area, and also the Kelompok Paya Keladi, RM129,700.00, sorry, Kelompok Padi Lahar Kepah, RM129,700.00, and also what I mentioned earlier about Kelompok Paya Keladi, RM39,800.00. Pipit is not just one bird, Jagung is not just one stalk. It is clear that the State Government has never forgotten the welfare of farmers and paddy planters in this state. On the second day of the debate, the Honourable Member for Pinang Tunggal also raised the issue of paddy planters not selling to Padiberas Nasional Bhd (BERNAS). As I said earlier, the same answer applies: BERNAS falls under the purview of the Federal Government, but the State Government is always involved in discussions at the Federal Government level to obtain information on new policies and related changes in the paddy and rice industry, especially to help the paddy planters who are affected.
Dato' Speaker, the Honourable Member for Telok Bahang also mentioned in his debate the proposal in the durian cultivation industry, particularly in the State of Penang. Dato' Speaker, the Honourable Member, the Sedusun Tech Valley Project, in collaboration with the Northern Corridor Implementation Authority (NCIA), which cost almost RM50 million and was approved by the Ministry of Economy, is an initiative to develop the durian industry with higher technology. In addition, the development of the Durian Valley@Relau projects in the area I mentioned earlier will also make it an agro-tourism centre in the state of Penang and at the same time make the Northern Region of Peninsular Malaysia a durian hub, and it will also attract more tourists, especially from within the country and abroad, namely from China, Singapore and so on. Also, the State Government has accepted the good proposal to ensure that the promotion of the durian industry is carried out more, more digitally and more widely.
Dato' Speaker, I now turn to the livestock sector. Earlier I spoke at length about agriculture. Responding to the issues of paddy fields, I now move on to the second sector, which is the livestock sector. To strengthen food security in the state of Penang through the Penang State Veterinary Department, we have identified the recipients of the Livestock Industry Project Development Programme this year, estimated at 32 persons, with an allocation of RM612.00. This annual assistance is actually intended to help livestock farmers in this state increase their livestock production. Dato' Speaker, in response to the statement made by the Honourable Member for Pulau Betong regarding the veterinary doctor posts in the district that are not, the shortage of doctors that makes it difficult to carry out major treatment. For the Honourable Member's information, the filling of posts in the Veterinary Services Department is based on the approved post warrants. At present, at this moment, Veterinary Officers have been approved and posted to the North East District, and we will also make representations at the Federal level to ensure that these posts will also be placed in districts such as Central Seberang Perai, North Seberang Perai and also South Seberang Perai.
I acknowledge that this idea and proposal is very good because indeed we lack Veterinary Officers, especially in the districts, as everything is concentrated at the Head Office. If we want to do surgery or an operation, it is difficult, we have to go to the private sector, and it costs quite a lot.
Don't forget the South West District.
Ah, yes, South West. In response to the questions of the Honourable Member for Telok Bahang and also the Honourable Member for Pulau Betong regarding the nuisance of wild animals. I urge the Honourable Member to lodge a complaint directly with the Penang State Department of Wildlife and National Parks (Perhilitan). I am confident the department always conducts monitoring in the areas where complaints are received. Traps that are set will be activated at all times for a period not exceeding three (3) months in an area, and I am confident the officers will comply with the guidelines that have been established and will also take action if complaints have been submitted to them. In response to the questions of the Honourable Member for Sungai Dua and also Permatang Berangan. I have answered many questions, yes. Regarding the pollution of Sungai Kereh and also Sungai Perai due to the discharge of pig waste, "bab 1", pig, "bab 1". For the Honourable Member's information, the State Government has built a biogas system to collect all the "bab 1" waste in our state so that it is no longer discharged into the rivers.
I want to say this problem is not a current problem, it has been around for a long time, decades, they have been here, this "bab 1" has long existed in areas such as Valdor and Kampung Selamat. They were there first, and generation after generation for decades. The State Government, only the Penang State Government, is the only state government that has implemented the Pig Farming (pardon the expression, Bab1) Enactment 2016 and also the Penang Pig Farming Regulations 2020, which stipulate that these pigs, or "bab 1", must be kept in what is called a closed house. Now I have also made a visit... (interruption)
Closed house system, closed house system.
Ha... closed farm, yes, closed farm, ha, closed house system, where the "bab 1" stays in an enclosed shed, where people sometimes also put themselves inside, meaning it is in the air-conditioning. A good air system and also a discharge system, and now the State Government has developed a biogas system in which the waste is collected and turned into power, gas and can also be managed as power and electricity. But the problem now... (interruption)
Ah, Pantai Jerejak.
Silakan.
If the government does that, I think that is a good effort. But why does the pollution still happen up to this day? Sungai Kereh and also the river that enters the Sungai Perai basin, people say it is polluted. It is still polluted.
Perhaps me. Dato' Speaker... (inaudible)
I also agree with what was said by Sungai Dua just now, because complaints from residents there, at certain times, sewage discharge still occurs.
Dato’ Speaker.
And the odour pollution still occurs. We thank the government for the initiatives taken to build closed farms and so on. But the pollution problem still occurs, and we ask that the government help the farmers. We are not asking them to close the sheds. We want the pollution to be controlled so that the communities living around the area can be spared from odour pollution and so on. That is the purpose of our raising this. Thank you for the efforts that have been made.
Thank you, Dato' Speaker.
Nak bantu?
Dato’ Speaker.
I allow you to help.
I just want to answer regarding the pig enactment, which has indeed been enforced, and at Kampung Valdor we have also set up one (1) biogas system, as my friend mentioned, and we will move on to Kampung Selamat. I will meet the farmers, especially the Farmers' Association in Kampung Selamat, in June. They will come and meet me, and we, as an initiative to encourage either a pyrolysis system or biogas to generate green electricity, green energy to reduce the problem that Sungai Dua mentioned, where we will use the waste from pigs, from the farm, to generate electrical power, and give us a little more time. In Kampung Valdor we already have one, and I believe that before long we will also have one in Kampung Selamat. Thank you.
Pantai Jerejak.
Thank you. I have 30 more minutes left.
No, no.
How many minutes do I have left, Dato' Speaker, in total?
You carry on.
Okay, carry on. I have already spoken for 30 minutes …
It has been 30 minutes.
I am very pleased that the opposition also understands the State Government's efforts. I am happy with the current atmosphere, harmonious, when the State Government explains well and the opposition also gives good ideas. This is what we want in this House of ours.
Don't provoke anymore.
No, no, that's right, that's right. Harmony.
I agree, don't provoke. Don't make politics, Pakcik Kordi. We don't want childish behaviour; act mature like adults.
I would like to give a speech of thanks on
Pulau Jerejak..
Hey, a little, a little... he wants to come in too... oh dear
Send him off to an island, Pantai Jerjak, excuse me ah. Dato' Speaker, regarding this closed house, I have personally experienced something in this closed house. I raise chickens, I know, but if I look at Kampung Selamat, did anyone go and see? They do not have a "track tanker" for when they wash the shed, when they wash the shed, bathe the pigs, what do you call it, bathing, that water, they do not have a tank, what people call a track tank, to filter the water clean before discharging it. Here they directly let it flow out into the drain, and that is what we got at Sungai Kereh, the black water. Indeed, although the closed house is very good, its system is very good, so we also raise chickens with a good closed house system, but when we clean the waste and so on, we must have that tanker, people call it track, the water must go through how many, how many layers before we discharge it. Okay, thank you.
Thank you. Suggestions like this, we want to hear. Good suggestions we take note of, so that we can implement them, to ensure that the State Government and all the people of the state of Penang live in a clean environment. We will take these recommendations and we will ensure that this will not happen. Just to give information. We had 153 pig farms in 2020, and in 2024 only 105 were recorded, and the rest have been closed because they did not comply with the guidelines we have implemented, with 15 farms complying fully, 100%, and 88 farms passing with conditional rates. In other words, there is good improvement and good management by the State Government. Here I want to give my appreciation, a very good appreciation, to the government officers, especially the Veterinary Department. They are the implementers below who constantly work hard to ensure that the Penang Pig Farming Enactment is implemented well and harmoniously. Thank you to the Veterinary Department.
I now move on to the fisheries sector, the third, before I land on that, cooperatives. Dato' Speaker, as a step to regain the glory of the Penang State Tuna Landing Hub industry, the State Government has studied proposals made by various parties for the information of the Honourable Members in this House. Penang is the only state that operates the tuna fishing industry. Everyone does not know, everyone does not know, even if I were outside this context, I would not know. I want to say Penang is the only state that is still active at a location gazetted as a tuna port apart from Langkawi. We have two (2) in our country, namely in Langkawi and in Butterworth. In Penang, up to now, we are the only state that runs the tuna fishing industry. This should be a source of pride because although the government or the state of Penang is a small state with a small sea area, we are champions in various issues. We are tuna champions. We must give recognition to the administrators.
Pantai Jerejak, how much profit did we obtain from tuna landings or the tuna industry mentioned by Pantai Jerejak just now?
Tuna landings have been declining every year. Now it is declining because of factors below; we do not have an internationally standard tuna landing hub, but the profit, from A to Z, which is from the industry, from the ownership of the tuna, then from the enforcement authorities, right up to the final test port to countries such as Japan, exceeds hundreds of thousands... (interruption).
Pantai Jerejak, may I interject a little, what types of tuna are we focusing on, blue fin or red fin, the types of tuna we are focusing on.
I will give a written answer. I do not remember all the types of tuna, but I am happy when the Honourable Members ask about fish types, InsyaAllah after this I will provide the types of fish we are focusing on. If there is a suggestion for tuna species that we catch or focus on that are more expensive, you may suggest them to me so that I can tell them to go and catch more.
But this is a big industry for the State Government to show, or focus on, just as I accept the challenge and proposal from the Honourable Member for Berapit and also the Honourable Member for Telok Bahang to ensure that an internationally standard tuna landing hub is established. But I would like to remind that we must look at it from all aspects. We cannot simply say we want tuna, we can build a tuna port, but we must look at it from all aspects, in terms of depth, in terms of many other aspects that must be looked at, in terms of traffic, in terms of the land available to the State Government, not all land can be used, only certain lands that we can use for the tuna industry.
Honourable Member, Honourable Member Dato' Speaker, for the information of the Honourable Member for Berapit, the proposal for the State Government to cooperate with fishermen so that we can help them increase their income by getting involved in the tuna industry, I accept that challenge, but generally we know that for the tuna industry we take a long time, two (2) weeks they have to go there, then the fishing process takes a period of three (3) months for our fishermen, which I think is less suitable. But if there are fishermen who want to get involved, we encourage it, but for the time being I think it is less suitable, the three (3) months, they must go out. It's nearly done. Dato' Speaker, I will continue... (interruption).
Pantai Jerejak, interjecting a little.
Honourable Member, let me finish my own... (interruption).
One (1) minute. YB Pantai Jerejak, for the information of this esteemed House, how many local fishermen, especially those who hold deep-sea fishing licences, are involved in this tuna industry, or are they all from outside? Thank you.
Honourable Member, in the state of Penang, and across the whole country, we have five (5), only five (5) licence holders who can obtain or are in the process of tuna fishing. Only five (5), and currently only one (1) is active. Of the five (5) we approved in our country, but at this time only one (1) tuna fishing licence holder is operating, namely operating in Butterworth. In other words, it is getting fewer by the day. Honourable Member, continuing to answer regarding Sungai Dua, regarding the silt problem caused by the reclamation project. I want to correct what the Honourable Member for Sungai Dua said. Yesterday, he mentioned 72 EIA conditions, whereas in the exact document, there are 71 correct conditions. In other words, the Honourable Member is lying, no, not lying, misleading the House. The Honourable Member misled the House. The fact is 71, but the Honourable Member said... (interruption).
It's one (1) mistake, ah, not ten (10) mistakes... (interruption).
This misleads the House... (interruption).
Alah... even if Pantai Jerejak says it, it is also a mistake.
No, no, he misled the House, because it has been displayed on social media and also picked up by newspapers. Some newspapers said 72, whereas in the EIA conditions it is the correct 71. Honourable Member... (interruption).
What is this... 71 or 72, what matters is whether there are, whether there are the names of the conditions. ... (interruption).
As I informed earlier, on 22 March 2024, there is no consistent data on the decline in catches due to the reclamation that has been carried out. ... (interruption).
What, who is this. ... (interruption).
LKN mentioned 22 March. I have already said to the Honourable Member, if in future in this House you bring a scientific report, please do not take silt from anywhere and bring it into this House; we looked and it was not convincing.
I, I invite you to come down, you can come down with me. ... (interruption).
If possible, rent a boat. ... (interruption).
Yes, yes, come down, ah, renting a boat is not very expensive.
The third body to produce a scientific report where the decline in yield due to the reclamation project, that we can accept, or we are more convinced that this one brought silt into the State Legislative Assembly. Not convincing, not convincing at all.
I want to take them down, let's go down, Sir, Mr Speaker, (interruption) I am responsible and I also want to take the people in this House, yes, can go down…(interruption) we will take you all out.
Honourable Member, I will continue with the next matter in helping these fishermen. I thank the Federal Government for giving RM350,000 so that we can buy or release fish fry and also prawns. In answering the question of Honourable Penanti, regarding the issue of fishing licences not being renewed, which also results in the number of fishermen decreasing. For the information of Honourable Penanti, the Department of Fisheries Malaysia (JPM) has frozen all issuance of licences and Fishing Vessel Permits for Zones A, B and C since 1982, not today but since 1982, in line with our country's commitment to international regulations under the Food, And Agriculture Organization and also the
Sustainable Development Goals (SDG) through the Life Below Water theme, which ensures fishery resources can be explored sustainably. Honourable Member. …(interruption).
Honourable Pantai Jerejak, the boats that. …(interruption).
Also, the Department of Fisheries Malaysia (JPM) always carries out the process of regularising licences that are inactive. Within this period of three (3) years, we will consider new applications.
Honourable Pantai Jerejak. …(interruption).
To finish, I want to use up my time, I am not giving way, I am not giving way, I want to settle my own problem.…(interruption).
If you cannot give way, what…Honourable Member must give way. Otherwise, how are we going to solve this problem. …(interruption).
Saya sebut….(gangguan).
Honourable Member, do not hold back one (1) minute or two (2) seconds, give way, Leader of the Opposition give way, we can add time, do not struggle to finish until today, there is Thursday tomorrow, there is Friday, we wait….. perhaps not, we continue until next week.
No, no. I have been speaking for 41 minutes now, okay. Honourable Member, the proposal regarding the Pasar Bisik in the area of Honourable Telok Bahang, we see that it is less suitable, not that it cannot be done but it is less suitable because there are seven (7) existing fish markets in the Balik Pulau Parliamentary constituency, and the implementation of Pasar Bisik will actually not give consistent advantages or profits to the fishermen, but if Honourable Telok Bahang…(interruption)
YB Pantai Jerejak, let me interject a little. …(interruption).
Let me finish first.(interruption).
About this Pasar Bisik, just wait a moment, only a little.
No, no, ha okay, yes.. (laughter).
YB Pantai Jerejak, this Pasar Bisik we hold, we set it up with the aim of giving more income to fishermen and reducing middlemen, because the fishermen who go out to catch fish, when they come back they bring the fish, put it there in front and immediately whisper. If we. …(interruption).
No need to whisper, can you not?
Apa dia.
No need to whisper, can you not?
It cannot, because there are middlemen, we want to reduce the involvement of those middlemen.
Okay, okay, I actually do not object, but I received a reply from which department, the Department of Fisheries, that if you want to do it there is no objection, but its view is less favourable. However, I think if you want to proceed, proceed, it is not a problem.
Yes…that is what we asked for approval from. …(interruption).
Yes, there is no objection, no objection, but let me just elaborate, I want to finish my winding-up, I will elaborate a bit longer. Dato', Honourable Telok Bahang, I have no objection if you want to set up a Pasar Bisik. If you want to set up the Pasar Bisik, perhaps it will add more value compared with an ordinary market, just ordinary, right, but the feeling is that everyone wants to come to a Pasar Bisik. That is up to Honourable Teluk Bahang; we can discuss implementing it in the area of Honourable Teluk Bahang. Dato' Speaker, I want to touch on Honourable Penanti questioning the data released by LKIM (Malaysian Fisheries Development Authority). I want to continue finishing this; I will add about 10 minutes because I am giving space to others. We, the Department of Fisheries, have also shown that there was indeed a decrease at the level of species, prawn landings, namely in August, but for October, November, December 2023 there was an increase. Although not significant, there was an increase. For the Penang State Cooperative, the State Government has implemented or directed all agencies under the Malaysian Cooperative Commission (SKM) to implement, monitor and ensure that cooperatives are run at state level, at district level, in the districts there are five districts that ensure the B40 groups can increase their income through cooperatives, indirectly putting an end to poverty, especially in the state of Penang. The last step, the last step by the State Government, we have gathered six giants, six cooperatives in the state of Penang to join with the State Government.
I, I will list the first one: Koperasi Tunas Muda Sungai Ara, Koperasi Guru Besar SUK Pulau Pinang Berhad, Koperasi Kerjaya Permatang Nibong Pulau Pinang representing the Agriculture Cluster, Koperasi Dagang Emas Pulau Pinang representing the Ar-Rahnu Cluster, Koperasi Penternak Burung Walit Malaysia for the Industrial Cluster, and finally Koperasi Pegawai Kerajaan Negeri Pulau Pinang for the Finance Cluster.
Alhamdulillah, in conclusion, as a state driving towards improving quality of life, guided by the Penang2030 vision, the State Government always focuses on the agriculture, fisheries and livestock sectors, although we are hampered by ENE industries.
Dato' Speaker, the durian season has arrived, as have mangosteen and dokong. Let us advance the state for everyone, I ask for your support.
Dato' Speaker, thank you, may I have a little (time).
Done, done.
Regarding the winding-up speech just now, I noticed that one issue that I raised earlier was not touched upon.
Later, what was not touched upon. …(interruption).
Regarding the one-off aid to paddy farmers who experienced a decline in yield in the last season.
Okay, I will give it later.
Mohon pencerahan.
Wait, okay, thank you Pantai Jerejak, I would like to call on Perai, please.
Honourable Dato' Yang di-Pertua Speaker, Honourable Chief Minister of Penang, Honourable Deputy Chief Minister I, Honourable Members of the State Executive Council, Honourable Members of the
State Legislative Assembly, Heads of Departments, Gentlemen and Ladies. First of all, I want to express my gratitude and thanks to the State Government and the people of Perai in particular, who have given cooperation and support to me in carrying out my responsibilities as Chairman of the State Executive Council Committee for the Housing and Environment Portfolio and as Member of the State Legislative Assembly for Perai State Constituency (KADUN). Upholding the opening address of Tuan Yang Terutama Tun Dato' Seri Utama Ahmad Fuzi bin Haji Abdul Razak, Yang Dipertua Negeri of Penang. On the occasion of the Opening of the Second Meeting of the First Session of the Fifteenth Penang State Legislative Assembly, which has many benefits and very comprehensive suggestions to be implemented by the State Government. On this occasion, I also want to express condolences to the family of the former Honourable State Assemblyman of Sungai Bakap, who passed away last Friday. I hope the family will remain steadfast in facing this trial and test.
First, I want to explain that several follow-up questions have already been answered during the House yesterday, and today I will try to summarise, summarise the winding-up by answering only the follow-up matters. Therefore, I will answer the housing issues first, then I will answer the environmental issues. Honourable Dato' Yang di-Pertua Speaker, many thanks are extended to Tuan Yang Terutama Tun during the opening address who was attentive to the housing issue for the people of Penang, especially for low-income and lower-middle-income groups. The State Government has outlined a target of providing 220,000 affordable housing units under the Penang2030 agenda to assist those target groups. So far, 160,744 units, that is 73.07 per cent of the target, have been supplied in Penang at various stages, namely 50,700 units have been completed. And 20,547 units are under construction and 89,497 units at various stages of planning.
Besides that, the State Government is also very honoured by the address of Tuan Yang Terutama Tun, who welcomed the State Government's intention to create a new category of affordable housing, type B2, priced at RM100,000 with a minimum area of 750 square feet without finishes. This category will fill a fairly large gap previously, between affordable housing category B priced at RM72,500 with a maximum household income of RM3,500 and RMM C1 priced at 150,000 with a limit, with a maximum family household income limit of RM8,000. It will benefit, including young married couples, families with a maximum household income of RM5,000 in line with the development, the MADANI Inclusive Housing Project. It is also a continuation of the implementation of the Penang 2023 unity manifesto under the main theme of empowering women and youth, namely introducing a special rental housing scheme for young people and also singles. The supply of rental units and rent-to-own, thank you, I thank the Honourable State Assemblyman of Teluk Air Tawar and also the State Assemblyman of Sungai Puyu. Regarding the need to supply low-cost public housing, PAKR, and rental units including PPR in Penang, I also want to say many thanks to the leadership of the Honourable Prime Minister and the Minister of the Ministry of Housing and Local Government (KPKT) for their commitment to ensuring that most of the housing welfare of Penang's people is secured through the assistance provided.
The State Government will continue to request the Federal Government to supply PPR units in Penang, especially on the island portion, considering that Penang is among the highest tax-paying states to the Central Government. The State Government will also always look for new land and sites to submit to the Federal Government for the purpose of developing PPR-type housing through the latest application to KPKT under RP 5 years 2025 of the Twelfth Malaysia Plan. The State Government has proposed several sites on State Government land to KPKT for the development of PPR type. I am pleased to inform that KPKT has conducted an assessment session, an initial assessment, on these sites, and one site has been selected for a site visit at the further assessment stage, namely land located on Lot 5381 and 5395 in Mukim 21 Central Seberang Perai, Penang, located only approximately 14 kilometres from the Teluk Air Tawar State Constituency. This PPR project will contribute to the supply of these housing units in that area. KPKT will forward the assessment report on that site to the Ministry of Economy for approval of financing of the PPR project under RP 5 years 2025 of the Twelfth Malaysia Plan.
The implementation of urban renewal projects, as raised by the Honourable Kebun Bunga and Pulau Tikus, is the main focus of the State Government through the Penang State Housing Board, in ensuring the supply of RMM can continue, besides providing comfortable and safe housing to the people of Penang. Strata residences in Penang have also begun to reach an obsolete stage, with units ranging from 240 square feet to 527 square feet not meeting the minimum requirements for residences, besides deterioration, the deterioration of residential building structures. In Penang, indeed we have many projects of this kind that were formed for small families in the past, which did not bring many benefits to the owners of those properties, those properties. So, we have a proposal to redevelop under our URC programme, yes. Five URC pilot projects are being and will be implemented, and under the urban renewal guidelines, other schemes may apply to the State Government through the Penang State Housing Board to be studied for feasibility, their feasibility, as everyone is well aware, the constraints of existing acts such as the Strata Management Act 2013 (757), the Strata Titles Act 1985 (Act 318) and the Land Acquisition Act 1960 can hamper the implementation of urban renewal projects. On this occasion, I want to record my highest appreciation to the Federal Government, especially to the Honourable Minister of KPKT, Honourable Dato' Nga Khor Ming, for his proactive initiative in the effort to establish the Renewal Act that can empower URC projects. Therefore, as raised by the Honourable Kebun Bunga, to expedite the implementation of these urban renewal projects, the State Government is working with the Federal Government through KPKT to draft acts related to urban renewal or amendments to the existing acts.
As additional information, the Town and Country Planning Department (JPBD) at KPKT level has held several engagement sessions with state and federal agencies in finalising the final draft for drafting the urban renewal act. Besides that, JPBD is also in the process of preparing a special area plan report, namely RKK Padang Tembak under the State Constituency of Kebun Bunga, which was raised yesterday. To see the potential feasibility of urban renewal projects in Padang Tembak with the involvement of the Federal Government. This RKK will add value and will facilitate, facilitate the implementation of urban renewal projects at the policy level, and is expected to further expand the area for urban renewal, especially involving land owned by the Federal Land Commissioner. As raised by the Honourable Bertam, regarding the issue of land ownership by young people who mostly face difficulties in obtaining financing facilities from financial institutions. Therefore, the State Government through Syarikat Jaminan Kredit Perumahan Berhad, namely SJKP, has introduced a housing credit guarantee scheme allocated with RM5 billion by the Federal Government, with higher financing limits, not only up to RM300 thousand but up to RM500 thousand, with a financing period that is usually 30 years, here it is extended to 35 years. Currently this scheme is offered through 15 major financial institutions in the country. With such financing schemes, it can at the same time help prospective first-time home buyers, especially young people with low and lower-middle incomes. Besides that, the State Government through the Penang State Housing Board is studying the need to improve the substance of the affordable housing guidelines.
To help the people of Penang, especially young people, in obtaining financing for home ownership, besides it being able to provide incentives to developers who wish to advance affordable housing projects in Penang so that those projects are viable. Improvements and amendments to these guidelines policies are targeted to be announced perhaps next year. One of the biggest problems for young people to own a home is the 10 per cent down payment. So, although we offer affordable housing to young people, our young people find it difficult to find the 10 per cent down payment, and according to the sale and purchase agreement, buyers have to pay a 10 per cent down payment before they can sign the sale and purchase agreement. This is one of the factors why our young people cannot buy houses. So, as a government, if possible, we should overcome this policy by providing room for easy entry for our young people, the likelihood of young people owning homes will be increased.
Perai requests clarification. Dato' Speaker, recently one of my voters received a low-cost offer of RM42,000 in Bandar Tasek Mutiara. And was asked to take a bank loan, but to take a bank loan for a RM42,000 low-cost house, the legal fee is about seven thousand, seven thousand. This is the legal fee for the
bank loan. Therefore, here, first-time buyers indeed find it difficult to get a low-cost housing offer. Second, when they get an offer, it is difficult to obtain a bank loan. Once they get a bank loan, the legal fee to sign the S&P for the loan is RM7,000 for a loan of about RM30,000 more, because he had paid an advance. Therefore, he had to look for relatives to pay in cash according to progress, because construction is still in progress. That is the problem faced outside. That is all.
Terima kasih.
Perai, yes, may I ask related to this. Regarding this loan, what is the long-term plan or is there a long-term plan from the State Government to help especially these young men and women to obtain loans from banks outside, or will the State Government provide land to them to take loans. Thank you.
Okay, for my colleague from Bukit Tambun, I too was shocked by the legal fees of RM7,000. Usually, usually the legal fee charged on the loan amount is 1 per cent of the loan. So I was also shocked. If possible, I would ask the buyer to find me, and I can look into it, because RM7,000 for a house priced at RM42,000 is really unreasonable, isn't it. I think the legal fee charged is rather high. That is equivalent to a house priced at roughly RM200,000 to RM300,000. Something wrong somewhere. I hope the buyer will be referred to my office so that I can help them further, okay.
And for my colleague from Kebun Bunga, indeed we have been facing this problem for a long time, haven't we. So, as I mentioned earlier, the 10% deposit is a high hurdle for them to cross. At present, the State Government does not have such a scheme, but the Federal Government does. Our problem is at the state level: many banks are willing to give loans of up to 110% of the house loan.
But the problem is that the developers who sell these houses want the 10% deposit paid. There is a reason for that too. When buyers are allowed to pay only RM100, RM500 or RM1,000 as deposit, and then the sale and purchase agreement is signed, what will happen if the buyer decides to withdraw? The developer would waste quite a lot of time waiting to complete the sale. So that is the problem. Nevertheless, we want to amend the existing Acts. And we have several plans which we will announce towards the end of this year, where we will also hold negotiations with developers, to see how we can allow flexibility in deposit payments to buyers.
For the information of the honourable State Assemblymen here, when I was in the corporate world, we did have a programme where buyers only had to pay RM500. All you pay is RM500 until
you collect the case. Indeed, schemes like that have been approved by KPKT (Ministry of Housing and Local Government) in the past. Together with the Penang State Housing Board (Lembaga Perumahan Negeri Pulau Pinang), we are indeed holding several meetings with banks and our other state stakeholders, namely the developers, to formulate new terms and conditions of sale, okay. Continue, he's gone.
Mr Speaker, on this occasion I once again wish to record my thanks to the Federal Government through KPKT, in particular the Honourable Ngar Khor Ming, for the continued commitment in approving allocations under the Housing Maintenance Programme (Program Penyelenggaraan Perumahan, PPP) for eligible stratified public housing, and the Malaysia Housing Maintenance Fund (Tabung Penyelenggaraan Perumahan Malaysia, TPPM) for eligible stratified private housing, since 2022. In addition, the provision of sufficient affordable housing to the people of Penang, and the maintenance aspect in eligible public and private housing schemes, will continue to receive serious and sustained attention, in line with the matter raised by the Honourable Member for Bagan Jermal. Here I would like to note that throughout the country, only Penang extends assistance for maintaining houses after they have been sold to our people. This is a very, very special initiative compared with other states in Malaysia. Among the assistance provided by the State Government for maintenance in low-cost housing schemes is the Penang Maximum 80 Per Cent Maintenance Fund (Tabung Penyelenggaraan Maksimum 80 Peratus Pulau Pinang, TPM80PP), which is open throughout the year under the supervision of the Penang Housing Board, to help finance up to 80% of total maintenance costs in low-cost and low-medium-cost housing schemes. I am pleased to inform the House that Penang is the only state that approves maintenance assistance allocations for low-cost private housing, where the management and maintenance responsibility under strata housing rests with the Joint Management Body (JMB) or Management Corporation (MC), in line with the Akta Pengurusan Strata 2013 (Akta757). Under efficient governance, the State Government has spent 369 million involving 30,489 jobs from 2008 to May 2024.
Mr Speaker, I am answering the question on the topic of the environment. Conservation and preservation of the environment is one of the aspects that is a priority for the State Government. This can be seen through the strategic land-use plan in the RSM Penang 2030 State Structure Plan, to safeguard the balance of development and the long-term interests of land use in the state, including forested areas. For the information of the House, through the 2024 budget tabling, the Federal Government allocated RM200 million for the ecological fiscal transfer (EFT) in 2024, compared with RM150 million in the previous year, to strengthen the State Government's efforts in conserving and gazetting protected areas. In connection with this, the Penang State Government received Ringgit Malaysia RM2 million at the town hall session on the implementation of EFT and the handing over of the EFT allocation letter on 20 May last. This allocation will be used to implement programmes and activities for the protection and conservation of forests and other biological diversity.
Mr Speaker, I thank the Honourable Member,
ADUN for Pulau Betong, who raised the issue of nuisance from wild animals, including dogs and monkeys.
The State Government authorities, through the Department of Wildlife and National Parks (Jabatan Perhilitan, PERHILITAN), have taken note of this problem and will take immediate action by monitoring, catching, and setting traps in the area. Regarding the same issue, the Penang State PERHILITAN has received complaints from the areas of Kampung Genting, Balik Pulau and Kampung Pulau Betong. Monitoring and control of this problem has been carried out. As for the issue of squirrel damage to crops as raised, PERHILITAN has identified that the species causing the damage is the common treeshrew (tupai muncung besar). This animal is classified as an unprotected species and is not included in the Akta Pemuliharaan Hidup Liar. PERHILITAN has also provided advisory services to farmers on preventive measures and methods to avoid such disturbances from recurring.
Mr Speaker, in answer to the question from the Honourable ADUN for Seri Delima regarding hydrocarbon potential on 15 November 2023, if this indeed happens, if this dream becomes reality, the Chief Minister would not need to worry about asking the Federal Government for 20%. In addition, for my colleague who complained that there is no money to build water tanks and water treatment centres, this can be overcome, yes. So this is something very big; we are just waiting because it is still under research. Petronas has announced that a new offshore multiclient 2D seismic survey has been conducted in the northern Strait of Malacca to explore and map hydrocarbon potential in open blocks, namely PM320 and PM321, Langkasuka basin.
This survey will increase the availability of larger and more comprehensive seismic data. The survey began in October 2023 and was completed at the end of December 2023. Meanwhile, the process of analysing the collected data is expected to be completed in June 2024. However, up to now, the discussion session between the State Government and Petronas has not been able to be held, due to Petronas's request to complete the data analysis process. The State Government is still at the discussion stage to maximise hydrocarbon discoveries in Penang based on the results of the survey carried out by Petronas Klang. The State Government, through the relevant agencies, will make integrated efforts to ensure this project meets the wishes and aspirations of the State Government. Besides that, the State Government is also conducting discussions and studies on exploration in the mining of rare earth elements (REE). Discussion sessions between the State Government and relevant companies have been held, and a visit to a pilot project site in the state of Perak is being arranged to look at implementation methods and the benefits to be obtained in terms of revenue returns to the state, comprehensively. This is so that our project, when implemented in future, meets the conditions and guidelines set by the relevant agencies to safeguard environmental interests. At present, many companies undertaking projects of this kind have met with us to make presentations, and we will make several visits, as this is new to us, so we too want to read and to know how we can expand our efforts.
Mr Speaker, regarding the pollution of Sungai Kereh, my colleague has already answered. This issue was raised by the Honourable ADUN for Sungai Dua and Permatang Berangan, which was answered earlier by the Honourable EXCO for Agrotechnology. Mr Speaker, answering the question raised by the Yang di-Pertua, the Honourable ADUN for Bukit Tengah, regarding the current status of the quarry site in Juru. For the information of the Honourable Member, the quarry sites operating around Hutan Simpanan Bukit Juru have been operating since 1950, and the quarry operation at Lot 3460 has been excised from the permanent forest reserve and granted title under Seksyen 410 Kanun Tanah Negara 1965 through Pelan Warta PW288. On 20 January 2024, the State Government approved the application for revocation of the transfer and transport of rock material permit 4C for PT9 PT4005, namely Lot Lama 1545 and Lot 833, Mukim 12, Seberang Perai Tengah. The State Authority also approved the revocation of the transfer and transport of rock material permit 4C for PT659, Mukim 12, Seberang Perai Tengah on 20 March 2024, and its minutes were confirmed on 2 April 2024. Mr Speaker, on this occasion I wish to extend millions of thanks and congratulations to. …(disruption).
Honourable Member, I would like to interject and ask a question.
Belum, nanti.
Because this issue is very important to my constituency. Although I thank you for the answer given. Last year I had already asked about this issue, and I was rather despondent or disappointed, because I was informed that the decision to approve the 4C was made in January this year. So at least at that time we had already raised, or I in this House had already raised, our objection, although this quarry is said to have started from the 1950s. But at that time it was only a small part of the hill that was worked, and what is now being objected to by residents is the enlargement of the area up to 30 acres of that hill. And we must not forget that the hill surrounding the quarry is, first, as mentioned, the forest reserve that we want to protect.
Secondly, the road leading out of the quarry is the only access road, which surrounds five village areas in that area. I understand that, according to the JAS department, if you want to build a quarry, you have to not go through residential areas. Perhaps Bukit Tambun knows more about this issue. I also want to point out that we have objected several times before, and I want to draw attention to a letter from the Department of Environment dated 29 Jun 2021. At that time the quarry wanted to apply for 4C, and JAS at that time rejected it, saying the EIA had already expired. Also, at that time, the letter issued by the Department of Environment had already highlighted the first objection of local residents. The second concerns the zoning of the quarry and the village, which does not comply with the requirements of the guidelines on fossil thing and zoning of industries and residential areas. Thirdly, the department had also received a petition of objection from residents, with the reasons given. Fourthly, other visual observations of traffic and roads found that the frequency of lorries entering and leaving the road is high, and this is a concern for safety. So JAS had also already done their investigation, and they found that there was evidence that indeed it pollutes, and so on. Previously, the former EXCO for environment, Dato' Seri YB Phee, had held engagement sessions with residents several times, and he was very concerned about this issue. Among other things, he had asked the quarry, he wanted to be very strict, what is the risk, have a rehabilitation plan, because this project will take thirty to forty years. It will destroy an entire hill, and it will continue to affect
YB, pendek.
the lives of the residents there. So I would like to ask what the rehabilitation plan is and what control will be put in place to ensure the well-being, safety and so on from the impact of this quarry? So I hope this matter can be answered. Thank you.
Thank you, YB. I take note. The problem we face is indeed a shortage of rock in the construction industry. Because of this problem, construction costs have also risen, so there was pressure for us to open several factories and quarries at that time, and we did open them, but I take note of the Honourable Member's concerns. Indeed, when we grant permission to these quarries, we can expect a certain level of pollution, but as a Government we must ensure that quarrying work is carried out professionally without disturbing the lives of those nearby, the way of life of the people beside it, especially what the Honourable Member raised earlier, that there is only one access road in and out, which we must examine again. I will call a meeting immediately after this meeting, and I will re-examine what we need to do to improve the existing situation, and if necessary we will reconsider whether to renew its licence in future for the sake of the people of Penang. We will consider it. Thank you.
On this occasion I wish to extend millions of thanks and congratulations to His Excellency Tun Dato' Seri Utama Ahmad Fuzi Bin Haji Abdul Razak on
the initiation of the One Million Trees in One Day Planting Programme in conjunction with Earth Day for the State of Penang. The State Government believes that this programme has brought many benefits to the surrounding environment, such as reducing the effects of greenhouse gases in the atmosphere and serving to absorb carbon dioxide from the air, especially in developing areas. According to the Malaysian Green Technology And Climate Change Corporation, one million trees can absorb 40,000 tonnes of carbon dioxide a year once these trees mature. Directly, this programme can create a lasting impact on the state of Penang, in line with the goals of Sustainable Development 13 and Environment Social and Governance. More proudly, this planting programme has also received recognition from The Malaysian Book Of Record (MBOR) as the Largest Simultaneaus Tree Planting. To conclude before I end this winding-up speech, many thanks are extended to Mr Speaker for carrying out his duties with such patience and also being fair. I also invite all Honourable Members in this House to continue to work with the State Government, particularly on my portfolio, namely Housing and Environment, to ensure that affordable housing for the people and the greening of the environment can be implemented for the welfare of the people in the future. Thank you.
Thank you, Perai, and next I would like to invite Padang Lalang. Please.
Thank you, Honourable Member, Mr Speaker, the Most Honourable Chief Minister, the Honourable Members of the State Executive Council, and all the Honourable Members of the State Legislative Assembly whom I cherish. First of all, I would like to take this opportunity to thank you for giving me the chance to take part in the winding-up session for the motion of thanks for the speech of His Excellency the Yang di-Pertua Negeri of Penang at the opening of this session of the House. Also, on this occasion I would like to extend my condolences to the friends and family of the late Honourable Member for Sungai Bakap, better known as Abang Zam. May Abang Zam's family be strong in facing this loss. Mr Speaker, personally, I feel the passing of the late very keenly, because in the last sitting Abang Zam often raised the issue of football. At present, I think my friends on the other side... the other day I had a chat with the Honourable Member for Permatang Berangan, but he is not very knowledgeable about football; only the late Abang Zam took an interest in football. So on this occasion I also do not forget to extend best wishes for success to our athletes who will compete in the Malaysia Games this year, which will take place from 17 to 24 August in Bumi Kenyalang, Sarawak.
Mr Speaker, I would like to begin with an issue closely related to Youth Affairs first. Youth are a major pillar for this state to continue to be competitive up to the global level. Penang also does not fail to celebrate the youth of this state so that they can boost their performance to continue to contribute and bring honour to the name of the state of Penang. Therefore, the Youth Day 2024 State-Level Celebration of Penang was held on 18 May 2024 in collaboration with the Penang State Youth and Sports Department, the State Government of Penang, and also the Penang State Youth Council, at the Lotus compound in the Seberang Jaya area. So for this celebration we also held the presentation of the State-Level National Youth Excellence Award of Penang for the association category, the male individual category and also the female individual category. Following that, I am pleased to inform you that the winner of the State-Level National Youth Excellence Award of Penang in the female individual category, namely Ms Nur Kamiliah binti Khairul Ed'zuan, Assistant Secretary of the Penang 4B Youth Movement Association, has won the first runner-up of the National Youth Excellence Award in the female individual category. So congratulations and well done to Ms Nur Kamiliah. This achievement shows, one could say, that our state of Penang is able to produce youth leaders who are also able to receive recognition and awards at the national level. Congratulations and well done. So, under the theme "Yakin Boleh" (Confidence Can), the State Government places its hopes on our youth and young people to contribute to the development of the state and national community with high confidence.
Mr Speaker, the Youth Day celebration that I mentioned just now does not end on 18 May 2024 only, but we have also planned since the beginning of the year the Jelajah Belia Programme Series to mark the Youth Day celebration for this year too. So this Jelajah Belia can be categorised as a unique programme, where our main target is to get closer to youth throughout every corner of the state. For example, on 26 May recently we held the Jelajah Belia 2024 convoy together with young people at Teluk Kumbar, which was attended by young people around the South West District and was also attended by the Honourable Deputy Speaker of the State Legislative Assembly. Not only that, on 24 March 2024, the Sahur Stop Programme at Permatang Pasir National Secondary School was also held together with approximately 100 youth in the Permatang Pasir area. This programme was also joined by my friend from Pantai Jerejak. So for the times to come, we will plan more programmes using such approaches so that we can get even closer to our young people and younger generation throughout every corner of the state of Penang. The "Jelajah Belia" series is carried out on a micro level at village and housing area level. This is in line with the Penang2030 Vision for the State Government to listen to the voices and views of youth more closely, to mobilise young people to contribute to the formulation of Government Policies that can help and guarantee the welfare of life and the future of youth, under various government initiatives whether by the State Government or the Federal Government.
Mr Speaker, through the Penang Youth Development Corporation (PYDC), one of the new policies introduced to empower youth is the Youth Development Fund. The Youth Development Fund is a State Government initiative to support youth organisations, youth wings of associations registered under the Registry of Societies (ROS), as well as organisations established under an Act of Parliament. I am pleased to inform you that as of April this year, out of a total of 46 applications that have been submitted and received by the evaluation panel, a total of 38 applications have been approved, involving a cost of RM100,000.00. So the programmes approved for this allocation are centred on skills, employability, volunteerism, association, leadership and recognition of youth. I also do not forget to inform you here that the Penang Talent Excellence Scheme, better known as the "Best! Anak Penang" scheme, continues this year as an incentive from the State Government to give encouragement and appreciation to Penang youth who have won competitions in academic and co-curricular fields at national and international levels. So, so far a total of 484 youth have received this incentive scheme, with a total amount of RM150,618 since 2022.
Mr Speaker, the Government today also does not forget those who are undergraduate students, male and female, and moreover the present generation is the generation that carries on, and the present Government constantly strives to prepare a path for these students to continue to bring the state of Penang to the pinnacle of success. So, to realise that aspiration in shaping the mindset and attitude of the new generation, we must understand what their instincts truly are, not through a top-down approach but through a bottom-up approach. So students, male and female, should be given the widest possible opportunities, so that the energy, creativity, abilities and skills of these students stand out more and make youth able to bring about great change to our state. Therefore, there are indeed plans under the State Government for us to look at, as I raised just now, the Youth Development Fund, which is specifically for youth organisations. Now we are drafting a special programme fund for public or private institutions of higher learning which focuses on students, male and female, to finance activities that can enhance their capacity in this state. Mr Speaker, I would like to answer the issue raised by YB Sungai Puyu and YB Pulau Betong... (interruption)
Mr Speaker, may I interject...
Please, the Honourable Member for Penanti...
May I ask whether the EXCO can also express regret over the acid attack case. Is there? Ah, okay. Because the topic of football is finished now.
The Honourable Member for Penanti, the youth matter will come later when we get to sports. Not yet. Let me have the space... (interruption)
Excuse me, YB, just a moment, YB...
It seems the Honourable Member for Penanti can read my mind, I already know. Please, Honourable Member...
Honourable Member, this concerns the youth associations in the area which are not registered; they are carrying out sports activities, especially football, sepak takraw and beach volleyball. So, is there any assistance that they need which we can channel to the EXCO?
Thank you, Honourable Member for Telok Bahang, for raising this. I think what Telok Bahang means refers more to those who wish to organise programmes or sports activities. Earlier, the fund I referred to is more about overall capacity building for sports. Indeed, under the Ministry of Youth and Sports (KBS), we have provided a community sports fund, namely financing for each programme ranging from RM5,000 to RM20,000. So I invite you, if possible Honourable Member, to ask them to register as an association that can be recognised, to make it easier for them to submit applications for this kind of allocation. I return to the issue raised by the Honourable Member for Sungai Puyu and also the Honourable Member for Pulau Betong concerning the problem of mat rempit or illegal street racing. The problem of mat rempit or street gangsters has become a national issue and has been widely discussed too. The Royal Malaysia Police (PDRM) Penang has identified several hotspots where motorcyclists gather and perform dangerous stunts that violate road traffic laws. So, among the rempit hotspots in the state of Penang that have been identified in the South West area are: Tun Dr. Lim Chong Eu Expressway, Bayan Baru Roundabout, Jalan Mayang Pasir, Jalan Mahsuri and also Jalan Tun Dr. Awang. Meanwhile, under the North East District: Padang Kota Lama, Tun Dr. Lim Chong Eu Expressway, Jalan Bukit Gambir, Jalan Sultan Azlan Shah. In Seberang Perai Utara (SPU): the Butterworth Outer Ring Road on the PLUS Expressway; in Seberang Perai Tengah (SPT): the PLUS Butterworth-Kulim Expressway (BKE); while in Seberang Perai Selatan: the Second Penang Bridge and also Taman Ilmu. For the information of the Honourable Members, this year up until April 2024, the total number of summonses issued in relation to this rempit problem is 4,169, where as many as 150 operations have been carried out by the authorities. PDRM has conducted integrated operations together with the Road Transport Department (JPJ), the Department of Environment and the local authorities.
Apart from that, PDRM Penang has carried out operations such as inspections of shops that modify motorcycles and other enforcement under the existing provisions of the law, and also conducted integrated operations during weekends and road blocks by the traffic unit, as well as 24-hour patrols by Police Patrol Cars and the Motorcycle Patrol Unit (URB). So we extend congratulations and well done especially to this initiative led by PDRM as our effort to tackle the problem of illegal racing. But on the part of the State Government, we actually understand our young people who often have a strong craving for adrenaline, the spirit to take part in activities of this kind. Actually, there are several solutions that we are looking at, one of which is the State Government through the introduction of extreme sports, for example recently at Gurney Bay, and we have also provided a skate park at Pokok Sena, and there is a skate park designed by our legend Padin Musa. Indeed, that skate park is for our young people to pursue that adrenaline spirit. We also understand that many of our young people, when they were young, also liked rugged activities like these. So we are also looking at whether the proposal to provide, in certain areas, a circuit on an ad hoc basis, not a permanent circuit, for motorsport enthusiasts to take part is feasible, because that is in discussion, and we hope there will be good developments on this issue.
So, Mr Speaker, I now move to the sports portfolio. As a high-performance and the largest and most prestigious sporting event in Malaysia, Malaysian sport has succeeded in producing many outstanding young athletes on the national sporting stage, to the point that they are selected to wear the national jersey, representing Malaysia in international sporting competitions such as the SEA Games, the Asian Games, the Commonwealth Games, and even the Olympic Games. So this achievement is made even more glorious, where some of these sporting talents have also succeeded in making a name as world sporting champions or holding the position of the world ranking as "World Number One Player" ..(with permission).. as once attained by Dato' Wira Lee Chong Wei in badminton and also Dato' Nicole Ann David in squash, who is an athlete born in our state from Malaysian sport that has been showcased since 1986. So this legacy is continued by new-generation athletes who belong to Generation Z, namely those born between 1997 and 2010, up to Generation Alpha, such as Goh Jin Wei in badminton who will represent our country in the upcoming Olympic Games competition in Paris, and also Chan Lu Yi from wushu, Fauzi Khalid from silat, Ng Chun Chen and Zarith Imaan in gymnastics, Faisal Halim or better known as Mickey in football, Muhammad Arif Afiduddin in karate, Amir Daniel in judo, Nurul Aliana Syafika from cycling, Farwizah Aina and Nur Auni Maisarah from beach volleyball, and many more, namely athletes who competed for the state of Penang at the Malaysia Games level and who have made names for themselves at the international level. So, with only 80 days remaining, the 21st Malaysia Games, Sarawak 2024, is about to arrive soon, namely as I mentioned just now, 17 to 24 August in the State of Sarawak, which is synonymous with the name Bumi Kenyalang. I believe, am confident, and am enthusiastic to state that the Penang State Contingent as a whole will, with sincere hearts, receive and convey the message from His Excellency the Yang di-Pertua Negeri who prayed for the glorious success of the State Contingent in Bumi Kenyalang in the opening speech at the opening of the State Assembly on 24 May last. So we target Bumi Kenyalang, we want to make Bumi Kenyalang Sarawak a gold mine for the state of Penang, and we want to go there to take back gold medals for us. So for this edition a total of 300... (interruption)..
Mohon mencelah…
Please, Honourable Member...
Thank you, Honourable Member for Padang Lalang. I believe that in every aspect, if we want to train an athlete from start to finish, it requires a very large allocation to be invested. However, for the year 2024, I also see the report that has been issued by MSN, which is one of the agencies whose allocation has been slashed the most. So, is this a challenge for the Penang State Sports Council (MSN) to continue to hold talent programmes that can bring in more new players or athletes to continue Penang's challenge at the Malaysia Games level or at the SEA Games or at other international levels. Thank you...
Thank you, Honourable Member for Air Itam, for the question, particularly regarding the allocation provided under the Penang State Sports Council. Yes, that is true. If we look at it, sport is indeed a holistic, long-term development. One important aspect is finance, but however, through the realignment of the budget provided by the Penang State Sports Council, we are not just sitting without taking any action; there are many approaches or methods that we can implement, for example cooperation with sports associations, cooperation with the Ministry of Youth and Sports, and also the state youth and sports department, among others, as the Honourable Member is aware, regarding the community sports fund and also the Sports Matching Grant (GPS) that has been introduced.
Let me give one example of the Sports Matching Grant, namely for the purpose of sports associations organising programmes at national or international standard. The matching grant offered is up to RM1 million. So we encourage sports associations to take part in this initiative, and the allocation provided is for us together to advance sport and the development of sport in our state. So for the Malaysia Games, 80 days from now, I hope the Honourable Members can also continue to support our state athletes, as preparation for us to achieve the target of 40 gold medals in Bumi Kenyalang once again. Bukit Tambun, please.
Minta pencerahan Dato' Speaker, Penang telah menganjurkan sukan SUKMA pada 25 Mei 2000 dan pada masa itu acara yang diadakan adalah 29 sukan dan lebih kurang 32 acara. Atlet lebih kurang 5,208 dan pada SUKMA yang terkini acara adalah lebih kurang 37 dan atlet hanya 6,694 sahaja tambahan tak banyak. Oleh itu, bilakah Penang akan menganjurkan semula SUKMA selepas 24 tahun kita menganjurkan SUKMA di Stadium Negeri Pulau Pinang Batu Kawan dan 24 tahun sudah berlalu. Bilakah kita akan menganjurkan dan bagi sasaran pada tahun 2000 kita memungut 34 emas, yang lalu 30 emas ha so up tadi sasaran 40 emas. Adakah kita mampu mencapai sasaran tersebut? Itu sahaja.
Saya percaya dengan sokongan padu Honourable Member for Bukit Tambun kita mampu capai jadi saya pohon saya ingin menjemput jugalah Honourable Member for Bukit Tambun kalau boleh nanti bulan Ogos nanti berilah sokong kepada atlet-atlet kita di Bumi Kenyalang nanti tapi berbalik kepada.. …(interruption).
Ada tiket kapal terbang kah untuk Bukit Tambun ke Kuching?
Honourable Member for Bukit Tambun tadi baru saya ajak nak bagi sokongan pula la Honourable Member for Bukit Tambun minta tiket kapal terbang daripada saya. Tapi saya, saya nak jawab tentang apa cadangan Honourable Member for Bukit Tambun tentang penganjuran SUKMA itu memang itu salah satu perkara yang kita lihat di mana kalau Honourable Member for Bukit Tambun masih boleh ingat tadi Honourable Member for Bukit Tambun petik tahun 2000
kita pertama kali kita anjurkan SUKMA itu memang fasiliti-fasilti sukan itu menjadi aspek yang penting khususnya infastruktur, kemudahan yang sesuai bagi kita menampung keseluruhan jenis sukan yang akan diadakan. Jadi itu memang di dalam perancangan State Government untuk kita lihat juga sebagai persediaan kemudahan dan juga fasiliti sukan untuk kita cuba untuk menyediakan satu rangka ataupun base yang baik supaya mungkin dalam masa tahun 2030 ataupun masa yang selanjutnya kita boleh mengemukakan permohonan untuk menganjurkan Malaysia Games tertakluk kepada kedudukan kewangan negeri Pulau Pinanglah. Itu salah satu aspek yang penting juga.
Jadi, saya nak alih kepada industri sukan. Itulah tadi kita bangkitkan seperti mana Honourable Member for Air Itam dan juga Honourable Member for Bukit Tambun. Cakap pasal sukan, cakap pasal duit dan sen saja sebenarnya ringgit dan sen ini sukan ini ia lebih daripada ringgit dan sen sebenarnya. Industri sukan tanah air juga, kita di atas landasan tersebut berkonsepkan sintesi teras MADANI yang menggabung jalin amalan sedia ada dengan pendekatan baharu yang direka untuk menangani isu-isu baru dan tidak pastian, State Government melalui portfolio sukan tekad untuk terus mengemudi arus sukan negeri ke arah penghasilan pencapaian kejayaan, kecemerlangan dan kegemilangan yang berterusan membelakangi segala rintangan yang mendatang. Untuk itu, usaha untuk mempelbagaikan serta memperbanyakkan platform, program dan acara kesukanan jenis rekreasi bagi terus menerus menggalakkan penyertaan masyarakat melalui amalan pembudayaan aktif sukan sihat, rancak dan cergas sepanjang masa melalui jalinan kerjasama serta pengukuhan bersama pelbagai pertubuhan NGO Pulau Pinang tetap akan diteruskan. Jadi State Government juga mengalu-alukan semua pihak untuk bersama dengan State Government dalam membangunkan modal insan yang sihat buat Pulau Pinang. Jadi, Penang State Sports Council berteraskan visi ke arah mendokong pelaksanaan visi Penang2030 turut sedang melestarikan sasaran pembangunan sukan berprestasi tinggi di negeri Pulau Pinang yang diasaskan melalui penerapan, yang pertama Pengukuhan Program Pembangunan sedia ada agar seiring dengan keadaan dan kedudukan kewangan dalam tahun semasa.
Yang kedua, mengekalkan kelestarian sukan negeri berteraskan Inovasi, Inklusiviti dan Pembudayaan Sukan Secara Holistik. Ketiga, Pemampanan Skim-Skim Kebajikan dan Daya Saing Atlet SUKMA Negeri melalui platform AtletPenang365. Yang keempat, Mengarusperdanakan Pencarian Atlet Terbaik Negeri secara berterusan setiap masa. Kelima, Memantapkan Pelaksanaan Kod Sukan Selamat, bebas doping dan mengekang amalan manipulasi sukan dari puncak pangkal. Yang keenam, Mengiatkan Pembangunan Mampan ke arah Malaysia Games dan selanjutnya sehingga ke Olympic Games. Ketujuh, Pemerkasaan Warga Sukan Negeri melalui teknologi maklumat dan digital dan kelapan Merapatkan kerjasama bersama dengan Pemegang Taruh Sukan Negeri dan Negara. Jadi saya rasa dengan komitmen pelaburan masa, tenaga dan sokongan yang berterusan aspek ini, kita dapat bergerak ke hadapan dengan lebih padu mencapai prestasi yang lebih cemerlang. Saya ingin ucapkan terima kasih juga kepada Ahli-ahli Honourable Members yang telah membangkitkan tentang isu penyelenggaraan dan juga pembangunan kawasan lapang dan juga kemudahan sukan di kawasan masing-masing. Jadi, ingin saya maklumkan bahawa pintu pejabat saya selalu buka luas-luas sepertimana Honourable Member for Jawi kata pintu pejabat saya buka luas-luas jadi saya
mengalu-alukan lah kepada Ahli-ahli Honourable Members sekiranya ada cadangan untuk pembangunan ataupun penyelenggaraan kawasan tanah lapang ataupun dengan kemudahan sukan sila maklumkan kepada pejabat saya.
Minta pencerahan.
Cari jangan tak cari. Cari.
Okey.
Silakan, the Honourable Member for Bukit Tambun.
Dato' Speaker, memandangkan Padang Lalang buka pintu seluas-luasnya. Saya ingin mendapat status perkembangan cadangan sport city di Stadium Negeri Pulau Pinang, Batu Kawan di bawah Perbadanan sebab kita masih lagi membiayai tanah seluas lebih kurang 100 ekar. Bagi saya ini merupakan satu, mungkin boleh menjanakan pendapatan kepada perbadanan secara khususnya dan kepada State Government secara amnya.
Terima kasih Honourable Member for Bukit Tambun, tadi saya kata pintu saya buka luas, jangan cabut pula pintu saya. Tentang cadangan pembangunan sport city memang ada cadangan telahpun dibentangkan di dalam Penang Stadium and Open Spaces Corporation Board di mana kini kita turut melihat kepada kaedah RFP untuk menjalankan konsep pembangunan sport city tersebut. Tadi Honourable Member for Bukit Tambun sebut tentang penganjuran SUKMA, itu salah satu aspek yang saya percaya kalau stadium negeri kita dapat dipertingkatkan dengan konsep sport city ia akan memberikan satu persediaan State Government sekiranya pada masa hadapan untuk sebarang penganjuran sukan Malaysia itu adalah satu persediaan yang kita perlu buat masa kini juga. Honourable Dato'.
Boleh saya mencelah.
Sila, silakan the Honourable Leader of the Opposition.
Honourable, saya telah mengemukakan soalan bertulis namun saya suka untuk minta respon daripada Honourable berkenaan dengan masalah di Machang Bubuk, Machang Bubuk pula di Merbau Kudung. Merbau Kudung dalam DUN Sungai Dua yang menghadapi masalah padang bola. Pihak sana, pihak remaja, pihak kampung. Mereka sebelum ini bermain di padang bola di belakang Dewan Besar Sungai Dua tapi hari ini Dewan Sungai Dua di apa nama dinaiktaraf menyebabkan mereka tidak ada tempat bermain. Mereka memohon untuk mereka bermain disitu ataupun mungkin kerajaan boleh menyediakan satu padang bola untuk kegunaan masyarakat kampung di sana.
Terima kasih Honourable Member for Sungai Dua, nanti, nanti mungkin saya akan lihat tengok apakah jalan penyelesaian yang sewajarnya untuk kita menyelesaikan isu yang dibangkitkan tersebut. Deputy Dato' Speaker, saya nak alih ke bola sepak sikitlah di bawah Penang FC. Demam bola sepak sudah kembali selepas hampir 5 bulan berehat kerana perubahan jadual Liga Malaysia, jadi pasukan Harimau Kumbang ataupun Penang FC juga sedang hangat mempersiap diri untuk mengharungi cabaran Super League musim 2024/2025, Super League yang telah mula pada 11 Mei dan persiapan pasukan sebenarnya kita telah bermula seawal tahun lalu, November tahun lalu. Jadi untuk makluman, ketua jurulatih untuk skuad utama kini dikendalikan oleh coach Akmal Rizal Ahmad Rakhli bekas penyerang kebangsaan kita di mana coach Manzoor Azwira juga diberi tanggungjawab untuk mengendalikan skuad Penang FC II bagi MFL Cup Bawah 23. Jadi, Penang FC pada musim kali ini melihat satu peluang keemasan untuk kita meletakkan pemain-pemain yang berasal dari negeri Pulau Pinang untuk bermain bagi negeri ini. Untuk makluman, pasukan President's Cup (Penang FC III) dan juga Youth Cup (Penang FC IV), kita telah berjaya mencungkil bakat muda di mana lebih daripada 90 peratus pemain adalah anak negeri kita, anak daripada Pulau Pinang.
Musim ini, penjaga gol utama Pulau Pinang, Sikh Izhan Nazrel anak Pulau Pinang juga telah bersetuju untuk bermain bersama dengan pasukan Penang FC secara pinjaman daripada pasukan Selangor FC. Di samping itu, Syamer Kutty Abba, anak jati Pulau Mutiara, yang bermain untuk Johor Darul Takzim FC (JDT FC) juga telah dipinjamkan untuk semusim kepada Penang FC. Jadi suka untuk saya maklumkan untuk skuad masa kini kita ada tiga orang pemain yang telah dipilih untuk mewakili skuad kebangsaan Harimau Malaya. Itu bagi saya satu pencapaian yang baiklah.
Walaupun musim ini baru sahaja bermula, kita rasa amat gembira kerana tiga keputusan awal menentang Sabah FC, menentang Terengganu FC di atas tangga
yang tinggi dan juga menentang PDRM FC, kita seri. Kita tak kalah, kita tak kalah kita seri dan berjaya memungut tiga mata daripada tiga dan kini kita menduduki di tangga ke-7 dalam Liga seperti mana disasarkan musim ini. Target kita adalah untuk 7 dan keatas kita capai sasaran buat masa kini. Dan bukan senang untuk kita bersaing dengan pasukan-pasukan lain yang ada dana yang jauh lebih banyak daripada Penang FC tapi kita berbelanja secara berhemat kita dapatkan pasukan yang kuat kita mampu juga bersaing berlawan gergasi-gergasi besar.
Honourable Member boleh mencelah sikit.
Sila.
Honourable Member, saya tengok isu bola, sukan selain daripada dollar and sen. Saya bagi contoh pemain kebangsaan sebelum ini Baddrol Bakhtiar sekarang ini Honourable Member for Gurun di Kedah. Dia berasal dari Sarawak tetapi dia bermain dengan Kedah. Saya rasa dana Kedah mungkin tak sebesar Pulau Pinang, tapi dia main lima musim saya rasa hampir enam musim di Kedah. Faisal Halim hanya main satu musim di Penang. So, selain daripada dollar and sen mungkin sense of belong kepada negeri ataupun suasana, latihan berpasukan itu menjadi pendorong kepada pemain ini untuk terus bersama dengan pasukan Harimau Kumbang ini. Mohon komen daripada Honourable Member.
Honourable Member for Kebun Bunga, sebenarnya Kedah mempunyai bajet yang jauh lebih besar berbanding dengan Pulau Pinang, tapi saya setuju. Itu sebab, itu sebab kita pun cuba untuk beriktiar, misal katanya musim ini kita berjaya meminjam balik mungkin tidak terus untuk menawarkan kontrak secara langsung tetapi dengan cara peminjaman Sikh Izhan Nazrel anak Pulau Pinang dan juga Syamer Kutty Abba yang kita, itu susah kita kena pujuk, pujuk. Cuba usaha untuk meminjam kembali ke Penang FC daripada JDT. Itu salah satu langkah yang kita sedang ambil dan itulah. Dukacitanya pada 5 Mei yang lalu, negara kita juga telah digemparkan dengan kejadian yang menimpa pemain Kelab Selangor FC, Faisal Halim yang disimbah asid, tadi Honourable Member for Penanti telah bangkitkan tentang isu itu. Ia jadi peristiwa kemalangan ini yang terjadi kepada Faisal Halim yang juga merupakan anak kelahiran negeri Pulau Pinang, orang Penanti. Beliau baru sahaja dibenarkan pulang dari hospital selepas lebih 2 minggu berada dalam jagaan rapi doktor pakar. Kami di Penang FC amat berharap beliau akan cepat sembuh dan kembali berkhidmat semula untuk pasukan beliau dan menyarung jersi Harimau Malaya dalam masa terdekat. Jadi, bagi pihak State Government, kita turut telah menyampaikan saya bersama dengan Tuan Faidrol , Director of Licensing, Seberang Perai City Council (MBSP) yang juga merupakan Ahli Lembaga Penang FC, kita sempat untuk sampaikan sedikit sumbangan kepada
abang Halim lah, bapa kepada Faizal Halim dan kita mendoakan beliau dapat sembuh dan kembali pulih beraksi di atas padang.
Minta pencerahan lagi, sebab pasal bola tak boleh punya, saya perlu berucap juga ha. Tentang bola memang ucapan tahniah sehingga kini tiga perlawanan, belum kalah lagi. Masih belum kalah, tentang ini sebab memang sebelum ini pihak Bukit Tambun FC memang berkerjasama dengan Penang FC tentang pinjaman pemain seperti Marcus Mah yang kini bermain di Bukit Tambun FC. Saya mengalu-alukan pemain-pemain muda daripada Penang FC yang ingin merebut peluang bermain di kancah lebih tinggi saya alu-alukan sebab bagi Bukit Tambun FC minta semua sokong pada 14 Jun ini akan lawan Kedah pada FA Cup. Itu sahaja.
Honourable Member for Bukit Tambun itu nanti kita PM tepilah. Itu hal ehwal Penang FC dengan Bukit Tambun FC. Saya rasa kita kembali kepada Dewan inilah.
Pembangunan pemain.
Betul-betul.
Sebab kalau tidak pemain simpanan kita jangan jadi macam pasukan gergasi. Mereka beli player lepas tu simpan dalam cold storage. Kita biar pemain simpanan kita atau pelapis kita berpeluang bermain dalam liga. Itu saja.
Jangan risau Bukit Tambun kita boleh bincang itu. Jadi bagi pihak State Government kita haraplah Faisal Halim dapat kembali beraksi. Dan adalah harapan Penang FC dan semua penyokong negeri Pulau Pinang pada suatu masa yang akan datang tiba tidak lama lagi, beliau akan kembali pulang berkhidmat untuk pasukan Harimau Kumbang. Itu yang kita harapkan seperti mana yang disarankan oleh Honourable Member for Kebun Bunga kita cuba. Honourable Deputy Dato' Speaker, Honourable Member for Pengkalan Kota telah, Pengkalan Kota tiada dalam Dewan. Mungkin nanti saya akan menjawab secara. …(interruption).
Honourable Member. Berkenaan dengan bola sepak saya ingin sentuh sikit. Saya rujuk kepada jawapan bertulis yang diberikan kepada Pulau Betong. Jika, sekarang adanya Penang FC tetapi jangan kita lupa sebelum penubuhan Penang FC adanya FAP. Dan perjalanan FAP ini memang memerlukan dana dan sumbangan orang ramai. Jadi saya tengok di sini permohonan daripada pihak persatuan masih berada di peringkat pertimbangan. Jadi saya mohon pihak State Government boleh salurkan walaupun tidak banyak tapi boleh salurkan sebagai permulaan mereka untuk kick start aktiviti FAP semula. Terima kasih.
Thank you, Honourable Member for Seberang Jaya, we are indeed considering it. We have not forgotten FAP, the Persatuan Bola Sepak Pulau Pinang (Penang Football Association), which is among the oldest football associations on our continent. So do not worry, that is indeed under consideration by the State Government. I went to Seberang Jaya since the Honourable Member for Pengkalan Kota is not in the House. The Honourable Member for Seberang Jaya raised the issue of the Sony Sports Complex Project in Seberang Jaya. I would like to inform you that the development concept is as proposed, with no changes from the plan submitted by the party that obtained the tender. They have also taken early action in appointing consultants and conducting preliminary studies at the project site. The Stadium and Open Space Corporation (Perbadanan Stadium dan Kawasan Lapang) has also held several discussion sessions with the tender winner to finalise the agreement involving three parties, namely under the stadium corporation, the tenderer and the landowner, which is Majlis Bandaraya Seberang Perai. It is indeed in progress, but we want to finalise that agreement before we can kick-start the project. I admit there is indeed a slight delay there, but I have been monitoring the project closely.
Okay, I will finally move on to the Health portfolio. Dato' Deputy Speaker, health is an important element for us to build a competitive nation that is advanced in this increasingly challenging global environment. An optimal level of health not only increases the life expectancy of the population but also enables the people of this state to live more productively, actively and prosperously. The National Health and Morbidity Survey, with permission (NHMS) 2023, focuses on Non-Communicable Diseases (NCD) and also Health Care Demand (HCD). The main objective of this survey is to collect random data on several non-communicable diseases and their factors, and subsequently on ways to control and overcome these diseases so that they do not continue to worsen in our country, especially in the state of Penang. So, under the Penang State Health Department, we are taking several important steps to reduce the prevalence and incidence of Non-Communicable Diseases (NCD) so that they do not continue to rise in this state.
So, early measures such as periodic health screening to detect diseases such as diabetes and hypertension early, early screening for cancer, and large-scale health screening through the PeKa B40 health screening, the National Health Screening Initiative, with permission (NHSI), through the Agenda Nasional Malaysia Sihat programme, are also being further intensified to detect diseases earlier. Dato' Deputy Speaker, the latest health data from the NHMS that I raised earlier actually shows data that I can say is truly worrying. Where the prevalence of obese adults in Malaysia is the highest in Southeast Asia at 15.6 per cent, followed by Brunei at 14.1 per cent, Thailand at 10 per cent and Indonesia at 6.9 per cent. So from the data I mentioned earlier, we can see that obesity has become something normal in our country, and Penang is no exception. So this rising trend is actually worrying all of us. This situation stems from sedentary lifestyle practices and the cultivation of unhealthy living practices among Malaysians. As a result, premature deaths, that is deaths at ages from around 30 to 69 years, are increasing.
So this also causes an increase in treatment costs and a loss of national productivity. In Malaysia, as many as 73 per cent of deaths are caused by diseases related to unhealthy living practices. That is why, Dato' Deputy Speaker, we see obesity also leading to diabetes, a disease with quite high mortality, and Penang is not spared either. Statistics show diabetes is one of the diseases that can be said to be "top". It is a disease that causes death, where one in six people in Malaysia has this disease, or equivalent to 15.6 per cent of Malaysians. What is more worrying is that most of those aged 18 to 29 have no idea at all that they are suffering from this disease. So health care is very important for us to know our health status. This also worries us, as according to a recent study, data shows two (2) out of every five (5) people in Malaysia have not undergone any health screening for a year. Each has 1,001 excuses, among them not feeling any symptoms, feeling healthy, having no time and having financial problems. Without our realising it, Penang is also moving towards ageing, and I am pleased to inform you that through the Penang State Health Department, we are also devising initiatives to address this issue. Among them is the National Health Screening Initiative Programme, and under the Agenda Nasional Malaysia Sihat, launched since 2022 to encourage all of us to undergo health screening in this state of Penang. This programme has screened as many as 36,000 individuals in 2022, 34,000 individuals last year, and 17,000 in 2024 up to March this year. So I call on the people of Penang to continue joining this Health Screening Programme to empower the people in health care, enabling them to gain knowledge and skills and take appropriate action in disease prevention.
On this occasion I would like to thank the Honourable Members who have answered my invitation to undergo health checks. I know the Honourable Member for Sungai Pinang has also done so. The Honourable Deputy Speaker has also undergone a health check. I hope this can be an example and model to the people out there to also take the initiative to undergo health screening. So, to respond to the issue raised by the Honourable Member for Berapit about the mobile toilets provided at Klinik Kesihatan Berapit: the sewerage system repair project at Klinik Kesihatan Berapit actually began on 30 April this year and is expected to be completed on 9 July this year as well. So the contractor has rented two mobile toilet units for the use of patients and staff of Klinik Kesihatan Berapit. We understand that, indeed, at present two units alone may not be enough to meet the needs. But I hope the Honourable Member for Berapit also understands this is only temporary. I will try to discuss with the Penang State Health Department to see what methods we can take to address the issue raised by the Honourable Member for Berapit the other day. But I would also like to share that the management of the mobile toilets will carry out cleaning service every day, daily washing, and periodic servicing three times a week to address the issue of infection.
Thank you, Padang Lalang, but what is of concern is that the advisory panel of Klinik Kesihatan Berapit also raised issues such as how pregnant women, because they have to face it every day. When I was pregnant I also went to KK Berapit for checkups, and indeed the toilet is a necessity. So I hope that, regardless of how, the Honourable Member for Padang Lalang can expedite the process, so that more units of their mobile toilets can be added. Thank you.
Alright, I take note of the Honourable Member for Berapit on that issue. Dato' Deputy Speaker, the Honourable Member for Penaga and also the Honourable Member for Seberang Jaya also raised the issue of the harms of alcohol use. For the information of the Honourable Member, health education materials, with permission, are indeed printed and distributed to every district, especially at district health clinics. Within the existing legal framework, there are indeed limits and restrictions on alcohol use in our society, including severe penalties and fines for its misuse. So this campaign on the dangers of alcohol use is a good proposal, and I, together with the Penang State Health Department, welcome any party wishing to collaborate to make a campaign like this a success. The Honourable Member for Batu Uban and also the Honourable Member for Pinang Tunggal raised the issue of electronic cigarette or vape use, especially among young people and teenagers. As is generally known, the Ministry of Health Malaysia takes a firm stance on this issue and will fully enforce the Akta Kawalan Produk Rokok Demi Kesihatan Awam 2024 or Akta 852 next month to curb the issue. So please regard this, especially to the public out there, as the final warning: if the Act is enforced, fines and penalties that can be said to be quite effective will be imposed to curb the issue of tobacco, especially electronic cigarettes. So we will monitor together with the Enforcement Division under the Penang State Health Department, and we will ensure this issue is addressed well. For closing, Dato' Deputy Speaker, in conclusion before I end my speech at this sitting, the State Government will always remain committed to developing this state so that it keeps moving forward. We are grateful that in this term the State Government is walking in step with the Federal Government, and such a golden opportunity we will make the best use of. I also do not forget to thank the Federal Government, which always extends a helping hand to our state to keep developing. I want to end by concluding with a pantun.
Pulau Pinang, Place of Meeting, The eagle soars high, Let us discuss and bring knowledge, Build the state and keep it shining.
So on this occasion I would like to take the opportunity to extend Pesta Kaamatan greetings to our friends from Sabah, and Hari Gawai greetings to our friends from Sarawak, not forgetting Hari Raya Haji, which will arrive soon, and also the Pesta Perahu Naga (Dragon Boat Festival, in Mandarin), which will come in June, not long from now. So, with those words, Padang Lalang humbly moves to support.
Thank you, Padang Lalang, and I now invite the Honourable Member for Kawasan Jawi.
Thank you. Honourable Dato' Deputy Speaker, the Honourable Chief Minister of Penang, Honourable Members of the State Executive Council and Members of the State Legislative Assembly, ladies and gentlemen. Good afternoon, peace be upon you, Malaysia Madani greetings, Penang2030 greetings. Thanks be to God that by His leave we can be together again on this beautiful and blessed Wednesday in the winding-up session of the First Meeting of the Second Session of the 15th State Legislative Assembly. I would also like to extend condolences and sympathies on the passing of the late Honourable Nor Zamri bin Latiff, incumbent State Assemblyman for Sungai Bakap, on 24 May 2024. May his soul be showered with God's mercy.
On this occasion too, I am proud and deeply grateful to inform you that on 29 April 2024, The United Cities and Local Governments Asia - Pacific (UCLG ASPAC), through the Global Covenant of Mayors for Climate Energy (GCoM) Southeast Asia Secretariat, awarded the Mitigation and Adaptation Badge 2023 to Majlis Bandaraya Seberang Perai (MBSP) for its commitment to issues related to climate change and adaptation.
The criteria for this award were based on the CDP–ICLEI Annual Report submitted by MBSP. For everyone's information, MBSP also received the same award in 2022. Therefore, MBSP will continue to be committed to becoming a sustainable and liveable city. This achievement has injected a higher fighting spirit into me and the State Government to continue providing the best service and dedication to the people of the State of Penang. Congratulations and well done once again to MBSP on this achievement. May other departments and agencies make this success an inspiration to create other successes in the future for our beloved Penang.
Honourable Dato' Deputy Speaker and all Honourable Members, to begin my words, before I conclude the questions that have been put to me, I extend my thousand thanks to the Honourable Members for asking questions related to my portfolio, namely Local Government and Town and Country Planning. I am very pleased to answer every question that lies in the minds and hearts of all Honourable Members.
Drinking coffee without sugar, Sipped together with kuih suji, The EXCO KT answers promptly, So that the YBs need not ask again.
Selasih leaves on the rack, Made into food for the young men, Thank you, Dato' Deputy Speaker, Now I wrap up my speech.
Turning to the first question from the Honourable Member for Bukit Tambun regarding the SPEED System initiative of Majlis Bandaraya Seberang Perai (MBSP), namely whether it can be extended to sectors other than the industrial sector: at the initial stage, this system focuses on industrial development because that sector has a high impact on economic generation and job opportunities for local residents. Furthermore, due to high demand in the commercial housing sector as well as mixed development, MBSP is implementing the first pilot SPEED Housing project, and this project is expected to be presented at the Local Centre Committee Meeting, namely the OSC, in July 2024. The SPEED manual will also be updated to include the housing, commercial and mixed development categories.
As for the Honourable Member for Batu Lanchang, he expressed concern over whether the once-a-year inspection of at-risk trees under the Penang Tree Inventory System, namely PeTIS, is sufficient, and whether it can guarantee the safety of road users. For the Honourable Member's information, Visual Tree Assessment (VTA) inspections of trees are carried out once every year on trees at risk, such as those leaning, having limited root space and injuries, and will be monitored periodically by MBPP's arborists to guarantee road user safety. Next, I take note of and strongly agree with the Honourable Member's proposal that the Picus Sonic Tomograph method be used to address this "tree" issue. For the Honourable Member's information, at present, MBPP uses the Picus Sonic Tomograph and Resistograph methods to detect decay in the branches, trunks and buttresses of trees, that is, the lower part of the tree near the roots. I will propose that MBPP also examine the use of the IML-RESI PowerDrill Series method, if appropriate.
The Honourable Member for Sungai Dua stated that he had sent a letter to MBSP to arrange a courtesy visit, but to date no response has been received. On behalf of MBSP, I apologise for this oversight, which has caused inconvenience to the Honourable Member. For the Honourable Member's information, MBSP always practises a customer-friendly culture and a "No Wrong Door Policy"; our doors are always open for any courtesy visit or visit, whether from within or outside the country, for the common benefit. Nevertheless, on 3 March 2023, MBSP was pleased to receive a courtesy visit from the Honourable Muhammad Fawwaz bin Mohamad Jan, Member of Parliament for Permatang Pauh, while on 14 November 2023 we received a courtesy visit from the Honourable Bukhori bin Ghazali, State Assemblyman for Pinang Tunggal.
This clearly shows MBSP's openness in projecting the slogan "Seberang Perai Aspirasi Bandar Masa Hadapan". MBSP has also recently received many applications from various agencies, whether government, private, NGOs and so on. As there are substantive duties that need to be prioritised, the scheduling of courtesy visits or visits had to be rearranged to a more suitable date and time. However, please do not be saddened, Honourable Member. MBSP will take appropriate action on the application submitted by the Honourable Member and is ready to receive the courtesy visit. For the information of Sungai Dua, I believe Permatang Pasir, when sending me a message, where he also wished to come to my office as there are matters to discuss, my door is open at any time, and Permatang Pasir also came and brought complainants again.
Pardon me, Honourable Member.
...so that we can discuss and resolve problems for the sake of our people, please.
I hope that among the responses of the Honourable EXCO, to make it meaningful, to hold whatever it is called, Majlis Bandaraya Seberang Perai can provide the nearest possible date for us to visit. Thank you.
I repeat once more, but the Honourable Member should not be upset. MBSP will take appropriate action on the application submitted by the Honourable Member for Sungai Dua. Don't worry, I believe I will ask them to arrange a time for the Honourable Member so that a courtesy visit to Seberang Perai City Council (MBSP) can be made, or the Honourable Member may come and meet me at any time so we can discuss how to solve the problem, thank you. If MBSP is still negligent, the Honourable Member may also visit the MBSP Headquarters to follow up on the application, as was done previously by the offices of the State Assemblyman and the Member of Parliament. Indeed, issues relating to the Local Authority (PBT) are very complex, including issues faced by traders at Sungai Dua Public Market due to heavy rain that caused damage to their business goods. Therefore, MBSP has arranged a dialogue session with the traders at Sungai Dua Public Market, planned for mid-year.
The Honourable Member may interject, if possible, and involve the State Assemblyman for Sungai Dua in the meeting as well, thank you.
Okay, I take note. Furthermore, the Honourable Member for Sungai Dua and the Honourable Member for Permatang Berangan raised the issue of drain cleaning. For the information of both Honourable Members, MBSP carries out cleaning of rubbish traps in drains in housing estates every day. For the cleaning of rubbish, dry leaves and weeds in drains and ditches, MBSP carries out cleaning once (1) a week, while for the removal of silt and mud in drains and ditches, MBSP carries out cleaning once (1) a month. In addition, MBSP also carries out cleaning of drain rubbish traps and scupper drains during disasters, heavy rain and flash floods to ensure water flows smoothly. MBSP also conducts periodic monitoring of drainage systems in housing estates and will include these areas in the priority list of flood hotspots.
MBSP will continue to commit and cooperate with any parties, including government agencies, in ensuring that drain cleanliness issues receive serious attention, especially in housing estates in Sungai Dua. As for river pollution caused by pig farming, the State Government, through both PBTs, has taken firm enforcement action under the Local Government Act 1976 [Akta 171] and the relevant Trade, Business and Industry By-Laws. Any pig farm owner who violates the PBT's conditions will be subject to compound, notice and licence revocation in accordance with the prescribed law and enforcement procedures. PBT always places the nuisance issue from pig farming as one of the priorities in every enforcement action carried out. PBT conducts inspections and monitoring of every pig farm throughout the State of Pulau Pinang. However, every action taken is subject to the jurisdiction and existing legal provisions. Regarding the issue of foreign worker dormitories in Teluk Kumbar,
Excuse me, I seek clarification in Jawi on the issue of pig farming, Dato' Deputy Speaker. Can Jawi explain the latest developments on the biomass-based treatment plant at Kampong Valdor, and secondly, will this model be used at Kampung Selamat to solve the pollution problem in the Sungai Kerian, that's all.
Just now, when we answered that Bukit Tambun is not here, and for Kampung Selamat we have already answered that we will study and see whether the biomass, biogas or biolysis system can be used. I have also been informed that in June I will meet with the breeders from Kampung Selamat so that we can look at methods of helping each other to reduce river pollution and air pollution, and we will also improve environmental cleanliness, especially in Kampung Selamat. Returning to the biomass at Kampung Valdor, actually this project falls under the Honourable EXCO for Environment, and as far as I know, the project has reached approximately 80% and is nearly ready to begin full operation. Due to the ASS, ASF, African Swine Fever (ASF), sorry, due to the ASF that occurred two years ago, the population of pigs at Kampung Valdor was reduced. When the pig population at Kampung Valdor decreases, it will continue to result in the production of waste, pigment waste from the pens, to be sent to this biogas project. I believe that under the Honourable EXCO for Environment, he will certainly hold a meeting or discussion with the companies operating in Kampung Valdor. So, regarding the issue of foreign worker dormitories in Teluk Kumbar, be informed that all Foreign Worker Dormitory projects must comply with the technical conditions stipulated in the Planning Permission Application (PKM). All applications submitted must carry out a Social Impact Assessment (SIA) and a Traffic Impact Assessment (TIA). Meanwhile, for new dormitory applications exceeding a capacity of 10,000 workers, approval must be obtained from the National Physical Planning Council (MPFN).
Penang Island City Council (MBPP) has approved a planning permission application for the proposal to erect a 27-storey worker dormitory block with 512 units on Lot 1859, 1860 & 1865, Tingkat Teluk Kumbar, Mukim 9, Daerah Barat Daya, submitted by Tetuan Chong Company Sdn. Bhd. However, the Planning Permission approval (Borang C1) has not yet been issued by MBPP to Tetuan Chong Company Sdn. Bhd., because the company has not yet fulfilled the conditions stipulated under MBSP.
MBPP.
Oh! Sorry, MBPP. Dato' Deputy Speaker, he..
Alert.
Thank you, he is indeed staying focused. For the information of this honourable House, it is also noted that Tetuan Zantelite Enterprise (M) Sdn. Bhd. submitted a planning permission application for a worker dormitory in Teluk Kumbar on 16 November 2023. However, I would like to inform this honourable House that Tetuan Zantelite Enterprise (M) Sdn. Bhd. withdrew the PKM, namely the Planning Permission Application, on 9 May 2024. Got it.
Thank you (laughter).
Got it, Dato' Deputy Speaker, one person may thump the table.
Boleh, boleh.
In answer to the questions raised by the Honourable Member for Penanti and the Honourable Member for Permatang Pasir regarding the issue of illegal factories operating in the State of Pulau Pinang, I confirm that, so far, there are 98 illegal factories in the administrative area of Penang Island City Council (MBPP) and 390 illegal factories in the administrative area of MBSP, as stated in the answer given for written question ID481.
The existence of a list of business names placed under the name of Perbadanan Bekalan Air Pulau Pinang Sdn. Bhd. (PBAPP) is because the buildings or enterprises belong to PBAPP, which will be coordinated by PBAPP. This list is the result of the hard work of the State Government through MBSP's initiative, which constantly strives to create a transparent and integrity-based building database, and subsequently to take action against buildings without approval. Therefore, I urge PBAPP to submit an official application for further action. For the information of the Honourable Members, the lot involving PBA is actually a water treatment plant. This plant is very important because it has existed for a long time for the benefit and well-being of residents. For lots involving government agencies such as PBA, they will be coordinated with the relevant agencies. Honourable Member for Sungai Puyu, indeed the issue regarding the adoption of the Solid Waste and Public Cleansing Management Act 2007 [Akta 672] is very exciting for many Honourable Members, such as
Sungai Puyu has come in already.
The Honourable Member for Kebun Bunga, the Honourable Member for Bertam, the Honourable Member for Batu Uban, the Honourable Member for Seberang Jaya, and the Honourable Member for Machang Bubuk, who asked questions about it yesterday. For the record, all those questions have been answered by me during the oral question session yesterday. As for the Honourable Member for Sungai Puyu, who asked about the number of derelict and abandoned vehicles still stored in the impound store of the MBSP Enforcement Directorate, for the information of the Honourable Member, the MBSP carries out impoundment for obstruction offences under Section 46 of the Street, Drainage and Building Act 1974, Act 133, where under this section any obstruction offence, including obstruction by derelict vehicles, obstruction by trade goods, obstruction by structures and so on, may be subject to impoundment. Apart from that, impoundment is also carried out on vehicles parked at will, arbitrarily, under the provisions of Section 48, Road Transport Act 1987, Act 333, namely obstruction of vehicles on the road. Based on MBSP records up to now, the total number of vehicles still stored in the MBSP Enforcement Directorate Impound Store is 255 vehicles. Batu Uban is not present, I skip. Seri Delima. The Honourable Member for Berapit has expressed concern regarding the Temporary Workers' Dormitory at Hotel Summit, Bukit Mertajam, which is occupied by foreign workers. For the information of the Honourable Member for Berapit, the Labour Department (JKT) is the party responsible for issuing the Certificate of Accommodation (COA) to the company or employer applying for a premises to be used as a worker dormitory. Applications made must comply with the conditions stipulated as stated in the Workers' Minimum Standards of Housing, Accommodation and Amenities Act 1990 [Akta 446]. Act 446 has enforced the requirements and regulations that must be complied with by employers regarding the provision of housing, accommodation and amenities to workers. This enforcement aims to ensure employers provide accommodation that complies with the standards set by law and regulations. Apart from that, this enforcement also aims to create a safe, clean and conducive living environment. Therefore, compliance with Act 446 will guarantee and fulfil workers' fundamental rights. The Honourable Member for Air Itam has proposed… (interruption).
Honourable Jawi, thank you for the explanation, but my question relates to Summit Hotel, Bukit Mertajam, which is being used as a foreign worker dormitory. It also touches on the entry of more than 1,200 residents into the hostel under the TLQ guidelines, which were issued without any objections being heard. As the people's representative in that area, I myself did not know until after January this year, when I saw an influx of foreign migrant residents, and I was asked by the surrounding residents, as indeed no one had told us. So I ask whether a social impact study was also conducted, and since this is only a temporary dormitory, how long will it remain temporary, and until when will it be closed? I want to know all of this so that I can answer the local people. Thank you.
Thank you, Berapit. For everyone's information, for the policy and guidelines for TLQ, Temporary Labour Quarters, the new policy or new guidelines were established on 1 January 2024. However, during the COVID-19 pandemic we did set up these TLQs, but this year, under the new TLQ guidelines, we only gave leniency to commercial and industrial areas without referring to the State Assemblymen of the constituencies. If operators wish to house their workers in residential areas, they must obtain confirmation or approval from the State Assemblyman of the constituency under the TLQ application. For information, the TLQ period, the TLQ period for this is because the period for COA is three years, therefore if they obtained their COA starting in 2024, the COA would expire in 2026. This means that this year, when we establish the new guidelines, we are considering that next year, that is in 2025, there may be foreign nationals or workers coming in, therefore we allow them within this 2-year period to apply for TLQ in commercial areas and in industrial areas. If there are also many under strata buildings, actually they can apply if they obtain permission from JNB or their community management. I give an example at Taman Pelangi in Juru. When we made a visit, we could clearly see from the administrative aspect and from the control aspect in a four-storey strata building, they indeed meet the requirements with security guard control, and are separated for men and for women, and for
Honourable Jawi, please clarify, I repeat my stance because I do not object to any foreign worker dormitory projects. However, here, although Summit Hotel, Bukit Mertajam is a commercial building, within a radius of about 100 metres around it there are local residents, and all the local residents did not know about this project, including myself, and this is a fact. So I ask here, although it fulfils all requirements and so on, in terms of communication this is a shortcoming. So I would also like to know whether a social impact study was carried out, because with more than 1,200 people entering, it will cause confusion, questions will be asked, and that cannot be avoided, and I myself also have to answer them. I feel that if there is a TLQ guideline issued without hearing objections and so on, it can be reviewed so that local people's representatives can know, so it is also easier for us to answer the local people. Thank you.
Thank you, Berapit, I take note. Indeed, TLQs do not need to conduct an SIA or TIA to make a TLQ application. However, we take note of the proposal from the Honourable Member for Berapit to review these TLQ guidelines. Returning to the Honourable Member for Air Itam.
Just a brief clarification. Regarding this TLQ, because Honourable Member for Jawi once announced that the TLQ is only for a period of three years, but for the CLQs in the market, in Bukit Tambun only two are operating now, one has received a CCC, two, err, one is under construction, three are in the process of entering the plan. Therefore, in this PKM application and construction, which takes approximately more than three years, so will the CLQs to be built be able to accommodate those existing in the TLQs, including those from Bayan Lepas where the licences were withdrawn, all of which have been dumped in Bukit Tambun? Will we be able to accommodate the foreign workers who previously lived in the TLQs, because of the three years, and after three years, what then? That's all.
Thank you, Honourable Bukit Tambun. I believe that among the planning permissions (KM) approved previously, some have been approved but the developers have not yet started construction. As far as I know, in Permatang Tinggi there is one (1), from 2017, next to Taman Markisah, Bukit Minyak, and there is indeed one (1) under Asas Dunia that was approved last year. KM has been approved, but this depends on the developer. When the developer intends to build, I believe he will be able to cope. However, we will look from time to time to determine matters relating to PLQ or CLQ. Thank you.
Honourable Air Itam has proposed that action be taken not to renew stall leases for hawkers who set unreasonable or unaffordable prices for food and drinks. For the information of the Honourable Member, the local authorities (PBT) in the state of Penang have no power, source of power or regulatory control over the pricing of goods by hawkers. Nevertheless, if there are any complaints regarding high selling prices, the PBT will carry out an investigation and will then channel the information to the Ministry of Domestic Trade and Cost of Living (KPDN) for enforcement action against PBT stalls. As for the issue of foreign cooks working at PBT stalls and pavilions, PBT has never permitted traders or hawkers to employ foreign cooks in the state of Penang. However, this happens because traders or hawkers have defied compliance with the conditions of licences or premises that have been set. Appropriate action has been taken by PBT, such as identifying stalls that employ foreign cooks, integrated enforcement action together with the Immigration Department of Malaysia, and cancellation of business licences in cases of renting to foreign nationals. I welcome it if Members meeting here find that there are foreign nationals working as cooks; they may report to their respective PBT so that we can collect data and take further action.
Next, allow me to answer the matter raised by Honourable Permatang Pasir regarding the construction of an ash storage facility and the widening of Chinese graves at Kampung Kepala Bukit. I also take due note of Honourable Permatang Pasir's request that this matter be reviewed and re-examined, given that it is in an area surrounded mostly by Malay Muslims. For the information of this Honourable House, the application for rezoning from Village Zone to Institutional and Community Facilities Zone for Lots 263, 283, 729, 731 and part of Lot 922, Mukim 3, Seberang Perai Tengah, was approved by the State Planning Committee Number 4 of 2024 on 30 April 2024 and confirmed on 17 May 2024.
However, if an application for planning permission is submitted, it will be processed according to the existing procedures under Act 172 and is also subject to the technical conditions of the relevant agencies. The strict conditions to be imposed also take into account various aspects, including issues of locality and objections from the surrounding community, which will be considered before approval is granted.
Not to be left out, Honourable Penanti also asked me about detailed guidelines and planning to address the issue of foreign worker accommodation. For the information of the Honourable Member, the State Government of Penang has laid down, under the Guidelines for the Planning of Worker Accommodation Construction in the State of Penang in 2022, approved on 28 April 2022, the areas permitted for the construction of centralised worker accommodation, namely CLQ. In these guidelines, the existing land use zones and building types permitted for the construction of worker accommodation include industrial and commercial. At present, the State Government is studying the suitability of light industrial areas to be used as worker accommodation areas. Worker accommodation in the George Town World Heritage Site, as designated by UNESCO, is not permitted. MBSP has prepared the Guidelines on the Employment of Workers or Assistants at MBSP Hawker Centres, Business Premises and Hawkers, approved on 29 May 2017, to control the involvement of foreign workers in the business sector in the Seberang Perai area. These guidelines are being reviewed by MBSP in line with current changes in policy or regulations at the Federal level. To answer the issue of liquor raised, I indeed take this issue seriously and have directed both PBTs to carry out monitoring and firm action against breaches of conditions.
For the information of the Honourable Member too, until now the conditions on the time of liquor sales have indeed been stipulated in the licence conditions, where retail liquor sales are restricted, namely from 10 am to 9 pm only. However, until now there is no liquor sale for other categories such as public houses and wholesalers. For the safety of workers or visitors at government premises, especially at KOMTAR, we will direct the Security Division of SUK to raise the level of security, such as prohibiting intoxicated individuals from entering the premises. To answer the question raised by Honourable Pinang Tunggal, here, Permatang Berangan…(interruption).
Honourable, may I interject regarding the liquor just now? Where does 7-Eleven run its business 24 hours?
I want to correct the point: liquor and alcohol are not the same. Beer and liquor are not the same. Beer falls under..under…(interruption).
What did the YB mean just now by the sale of this liquor?
Liquor is subject to excise duty by Customs under alcohol that is more than... I need to obtain slightly more precise information on alcohol exceeding 15 per cent and above. …(interruption).
So what about what is sold at 7-Eleven?
7-Eleven alcohol. It's different. Don't, don't misunderstand, don't be mistaken.
Because the definition of liquor according to…(interruption).
Alcohol at 7-Eleven and liquor are indeed different.
The definition of liquor is anything intoxicating in the eyes of Muslims. Every intoxicating thing is haram in the eyes [of Islam], so we do not want that...
We take note, YB Sungai Dua.
This takes into account the sensitivity of Muslims, because only 7-Eleven can be visited by anyone, thank you.
We take note. Thank you, Sungai Dua, Teluk Bahang. I refer to the debate by Air Putih on the development of Gurney Bay. As everyone is aware, Phase 1 has been completed and opened to the public on 4 February 2024. Meanwhile, development works for Phase 2 are being carried out and have now reached 52% progress on site and are expected to be fully completed in 2025. JKR, together with the consultants, is closely monitoring the works in Phase 2 so that the delay in implementing the project does not recur. To date, the State Government has spent RM71,627,929.60, of which RM43,526,543.06 is payment to the main contractor. For Phase 1, RM 14,216,797.25. For Phase 2, RM29,309,745.81, and RM28,101,386.54 in payments to NSC, namely Nominated Sub-Contractor.
Dato' Yang di-Pertua, may I interject on this Gurney Bay issue. Gurney Bay has been opened for roughly four months, and payments have also been made. But there are still cracks in the floor, okay.
Let me finish first, thank you, I take note. Regarding the proposal to appoint an independent Government Expert Consultant to re-examine the project cost estimate, at present the State Government only refers to the cost estimate prepared by the Quantity Surveyor appointed for this project. The cost estimate prepared is based on the initial concept plan and design components prepared and presented by Tanjung Pinang Development Sdn. Bhd., namely TPD, in 2016 together with GDP Architects. In addition, this cost estimate was also checked by the JKR Quantity Surveyor before the tender invitation was made. Honourable Air Putih also raised the issue of the project supervisor not being appointed to supervise the Gurney Bay project. For the information of this Honourable House, on 3 June 2020 the State Government, through a document of agreement, appointed Tanjung Pinang Development Sdn. Bhd. as the Project Management Office to monitor this project on behalf of the State Government, and the appointment of Tanjung Pinang Development Sdn. Bhd. was at no cost to the State Government. Tanjung Pinang Development Sdn. Bhd. still supervises this project together with the project consultants on behalf of the State Government and attends the Project Monitoring Meetings.
I would like to explain that the Gurney Bay project is equipped with a monsoon drain built alongside the broadway along Gurney Drive to facilitate drainage of the area to the sea, and the provision of the monsoon drain follows the conditions stipulated by MBSP. I cannot deny that there are cracks in the concrete slab in Phase 1, and this matter is taken seriously. Phase 1 is now in the Defect Liability Period (DLP) until 3 February 2026, and all defects identified are being repaired by the main contractor.
Point of order. There are further questions. As for the contractors and also the subcontractors appointed, given that their work is rather poor, will they be blacklisted by the State Government? That is the first. And secondly, apart from the cracks, there are also issues regarding the trees, the types of trees planted and so on. We have also received many complaints from the public, so what is the action to ensure that the environment and the place at Gurney Bay can be developed optimally? Thank you.
Thank you, Pulau Tikus. For the information of Pulau Tikus, JKR, as the Project Controlling Officer (Pegawai Penguasa), has managed the appointment of the NSC, namely Nominated Sub-Contractor, according to the established procurement procedures. For this project, there are four (4) NSCs specially appointed according to their respective fields of expertise and placed under the main contractor, namely Arissa Engineering Sdn Bhd for Soft Landscape, Aizel Construction Sdn Bhd for Skate Park & Playground, Rites Sdn Bhd for Steel Roof Works and TPJ Engineering Sdn Bhd for Marine Engineering. The State Government will take drastic action against the main contractor or NSC that fails to carry out the repair responsibilities that have been identified. Therefore, the State Government has also set up a Gurney Bay Project Monitoring Committee, chaired by myself, to scrutinise the implementation of this project. The State Government will continue to give a high commitment to ensuring this project is completed within the stipulated period.
Regarding the blacklisting of contractors who fail to carry out their projects, I think we need to examine this in terms of the agreements that have been signed. Therefore, we have set up a Gurney Bay project monitoring committee. I believe Pulau Tikus is also invited to this Gurney Bay Project Monitoring Committee. Perhaps we can discuss further the failure of the NSC or the failure of the main contractor. Dato' Yang di-Pertua and all Honourable Members, the time has come for the Waste Separation at Source Policy to be enforced again towards preventing environmental pollution.
Honourable, I want to refer to the Gurney Bay Project. Some problems cannot be denied. The first is what is the current progress status of Phase 2. This is the first matter: whether it is delayed, and by what percentage it is delayed.
Thank you, Air Putih. The progress status of Phase 2 for now is 52 per cent. The delay is about 25 per cent, that is, about, if I am not mistaken, it's about 70 days.
Scheduled to be 80 per cent completed?
Ya.
But it is only 50 per cent complete now.
52.
52, so lewat...
Delay of 25 and above.. (interruption)
So lewat 28 peratus.
Ya.
Usually a project is 28 to 30 per cent late, which means it will be subject to late-completion penalties. If following common practice, when it is 28 per cent late with late-completion penalties, it means it will not make a profit on this project. I think Honourable Bukit Tambun, as an experienced surveyor, can calculate this. If a contractor cannot make a profit on a project, they will not be serious about completing the project well, so I think this matter can be considered by the government, because it seems that at 28 per cent there is no profit. If there is no profit, they will not try hard to complete the project. Bukit Tambun also knows, as a surveyor, this is what worries us, because if there are problems in the first phase, the second phase will become worse as it will involve such a huge amount of money. Up to now, RM71 million has been paid, right? The Honourable Member just mentioned that RM71 million has been paid….(interruption)
Honourable, this project is included among the troubled projects that need attention. Can it be categorised as a troubled project?
The project is not troubled; the project is still running. If it were a troubled project, it would have stopped; the project is still going on. Don't say that. I ask Sungai Dua to withdraw. A troubled project is indeed troubled.
I am not alleging, I am asking.
That’s why I minta you tarik balik. Ini bukan projek sakit, ini projek jalan.
Surely one cannot ask?
Withdraw, withdraw.
What would I withdraw for? I asked.
This is not a troubled project. This is slander….(interruption)
Go on, go on, continue.
So if RM71 million has been paid, it means there is 100 million ringgit. This is what worries us, because of the huge amount of money spent on contractors who may have problems. So here, is the State Government ready to consider this as a last resort to replace the contractor, because it is known that he will not make a profit on this project, and if there is no profit, problems will certainly arise, and when we pay, we not only pay, we may end up paying even more.
Thank you, Air Putih. Indeed, for this project, during Phase 1 the EOT was granted three times, and for these three times we gave a total of 122 days for the three EOTs. Therefore, the delay in Phase 2 was indeed unavoidable. What Air Putih proposed, we take note of, and we will see as the situation develops. As I said, we indeed have a monitoring committee, and we need to examine the agreements that were signed under JKR in 2020; we need to look at all the terms and conditions that were laid down.
Finally, I thank Honourable Jawi for trying to save this project, which is now in trouble. Some of the issues I raised, I will take up with the Honourable Member in the committee together with Honourable Pulau Tikus, including such matters as the damaged play areas being completed and built properly, and so on. One is about PDP: is there now a need for us to have a project manager? If we hand it over to JKR as discussed before, JKR does not have the capacity; it has more other works to be the PMO for this project. Earlier it was suggested that TPD, namely Tanjung Pinang Development, be the PMO for this project. But once it is done free of charge, when a company does something for free, it has no responsibility or obligation to carry out the work properly. So, this is always my view and my experience: whenever a company wants to offer something for free, we must be careful, because when it does so for free, it has no obligation to do it well. So it is better that we set a fee payment, so that when it does not do well it has an obligation, and legal action can be taken against it. But as for other matters, I also do not want to waste the time of this House; we will discuss them in the committee meeting. Thank you.
Thank you, Air Putih. The time has come for the Source Separation of Waste Policy (Dasar Pengasingan Sisa Di Punca) to be re-enforced, with the aim of preventing environmental pollution and maintaining ecological balance, while also reducing waste generation at disposal sites. This policy began on 1 June 2016 and was enforced from 1 June 2017. Re-enforcement of the Source Separation of Waste Policy will begin on 1 July 2024. The measures taken by the State Government through both local authorities (PBT), namely MBPP and MBSP, to enforce the implementation of the Source Separation of Waste Policy are as follows: they will carry out inspections every Saturday at landed and multi-storey premises as an initial step of notification and education for the public; installation of banners (kain rentang) in residential areas and areas frequented by the public; distribution of videos, posters and banners related to this on the social media pages of MBPP and MBSP via Facebook and TikTok, as well as LED billboards around the administrative areas of MBPP and MBSP; strengthening awareness through public education across all schemes, including schools, institutions, villages, commercial premises, factories, housing estates and multi-storey residences; and providing awareness briefings to the MPKK, KRT, and also representatives of the State Assemblyman's Office (ADUN) and representatives of the Member of Parliament's Office. If there is any non-compliance with this policy, I have instructed both PBTs to take firm action against any individual concerned. Dato' Deputy Speaker and Honourable Members, I have answered all the questions raised. Before concluding my remarks, I take this opportunity…(interruption)
A little clarification. I asked a question, why, QF25. An illegal factory that is so well protected.
Kilang…(ganguan).
Why is it so well protected, and not yet closed down. Why so well protected, that is my question.
Earlier, I happened to meet the Honourable Permatang Pasir, and I have already answered. Perhaps Permatang Pasir wants to announce in this August House so that the voters can see the wisdom or ability…(interruption)
Yes, yes, I want the complainant to know. I want the complainant to know.
For the information of Permatang Pasir, the PBT will follow procedures, and we must understand that when we take action against something, other than following the notice, as Permatang Pasir said, on such-and-such a month and on such-and-such a date the PBT had issued a notice to vacate the structure or building, but I hope Permatang Pasir will give the PBT a little time, and that it is not just one case for the PBT to resolve but many. We need to follow up, and do not worry, we believe that once a vacate notice has been issued, the PBT, MBSP, will certainly carry out their duties.
Okay, good, thank you.
Okay yes, agreed, ha. Thank you.
Honourable Jawi, a little more on what KOMTAR raised regarding the Octopus Pedestrian Overhead Bridge (Jejantas Pejalan Kaki Octopus). This is not the first time I have raised it in this House, about I cannot say the project is defective, but since the project was upgraded, it is not that the lift is broken, it is the escalator that is broken. So for the OKU to use this overhead bridge, imagine they are in a wheelchair at point A, they go up to the top, they want to go down at point B, but when they get there the lift is broken, they have to go back to point A and cannot cross that area. So maybe one day I will invite Honourable Jawi…(interruption)
I usually walk because I walk to go for lunch.
That problem, Jawi certainly understands how it is to see…(interruption)
Okay, I have taken note of what KOMTAR raised. In fact, we will hold a discussion together with the PBT. I understand this project was previously under the CSR Project, right. I will hold a discussion with the PBT regarding the overhead bridge raised by KOMTAR. I have already answered all the questions raised…(interruption) Before concluding, I take this opportunity to extend my heartfelt appreciation and thanks to the Honourable Chow Kon Yeow, Chief Minister of Penang, for the trust given to me to helm the portfolio of Local Government and Urban & Rural Planning. Also, my deepest thanks to all departments and agencies, whether government or private, especially the Local Government Division (BKT), the Penang Island City Council (MBPP) and the Seberang Perai City Council (MBSP), for providing very close cooperation and showing very high work commitment in helping me steer the portfolio I have taken on. Truly, without your help, I would not have been able to run this fast in facing all kinds of worldly vicissitudes to jointly lead this sovereign state to a higher plane as a sound and forward-looking advanced state. As I quoted from the speech of the TYT Yang di-Pertua Negeri during the opening ceremony of the First Meeting of the Second Session of the Fifteenth Penang State Legislative Assembly last Friday. Whatever I have done, am doing and will do is simply "For Our State".
For the dignity of a proud race, I willingly endure thorns and thistles; So that my Penang may remain proud, The Unity Government, pillar of aspirations.
Honourable Dato' Deputy Speaker, I beg to support. That is all, thank you…..(interruption)
Thank you to Jawi for the praise just now, and thank you once again to Jawi for the announcement of the withdrawal of the Application for Planning Permission for a Foreign Workers' Hostel at Teluk Kumbar, thank you very much. Next, we invite Sungai Acheh.
Okay, just briefly. Bismillahirrahmanirrahim… Honourable Dato’ Deputy Speaker, YAB Chief Minister, Members of the State Executive Council, Honourable Members, Heads of Department, and the government officers present today. First of all, let us together offer our highest gratitude to Allah SWT for His permission, that the First Meeting of the Second Session of the Fifteenth Penang State Legislative Assembly (DUN), which began with the Opening Speech by His Excellency Tun Dato’ Seri Utama Ahmad Fuzi Bin Haji Abdul Razak on Friday, 24 May 2024, has proceeded smoothly. On the same day, the passing of one of my comrades-in-arms and fellow villager in the District of South Seberang Perai, the late Nor Zamri Latiff, State Assembly Member (ADUN) for Sungai Bakap. May his soul be showered with mercy and return among the faithful. Condolences as well to all the family members of the late.
A house with pillars and plank walls, In the middle of the bridal house's yard, Even if all hope is lost, Still I stand firm with Palestine.
On this occasion too, I would like to draw the attention of Honourable Dato’ Deputy Speaker and Honourable Members to the current situation in the land of Palestine. They are bathed in blood; the sound of bombs shatters the silence, and a rain of bullets haunts its people. Pinch the right thigh, and the left thigh feels it too. That is the most fitting analogy for the feelings of the majority of Malaysians and indeed of the world community towards the war or genocide… (with permission), Deputy Speaker, taking place in Palestine now. The cruelty, oppression and violence of Israel against Palestine. This is a heinous act that takes lives, most of which belong to women and innocent children.
Therefore, let us all, regardless of race and religion, show solidarity with Palestine in protesting the actions of this cruel and tyrannical Zionist regime. Let us together pray that the people of Palestine receive justice and be protected by Allah SWT. Honourable Deputy Speaker, I would also like to record my congratulations to the Unity Government for all its efforts and initiatives that are caring and attentive to the grievances of the people, especially in Penang. The Unity Government under the leadership of the Honourable Prime Minister, Dato’ Seri Anwar Ibrahim, also continues to work hard in realising the Malaysia Madani agenda, which serves as a catalyst for harmony in a plural society, sustainable development and good governance. Before I touch specifically on the content of this winding-up, I would like to thank the Honourable Members who took part in the debate on the Speech of His Excellency the Yang di-Pertua Negeri, which touched on issues under my purview, particularly Trade, Entrepreneurship Development and Rural Areas.
Honourable Deputy Speaker, the rising cost of living is an issue that has long plagued the people, and the situation has become increasingly severe after the post-COVID-19 pandemic. Compounded by the readjustment of electricity subsidies and the increase in treated water supply charges, this has affected the people's financial strength in the months ahead. Without prejudice, there is an urgent need for the government to find short-, medium- and long-term solutions to help the people absorb the burden of the rising cost of living today and in the future. Dato’ Deputy Speaker, the implementation of the Jualan Rahmah programme organised by the Ministry of Domestic Trade and Cost of Living Malaysia (KPDNHEP) is a short-term measure to help people facing high living costs due to the global economic uncertainty that has hit the world. From January until 19 May 2024, the Jualan Rahmah Programme has been held 366 times, involving 13 parliamentary constituencies and covering 40 State Assembly (DUN) constituencies. On average, this Jualan Rahmah Programme is held 80 times a month. A target of 960 times has been set, including open sales as well as mobile sales covering all State Assembly constituencies in the State of Penang throughout 2024.
Dato’ Deputy Speaker, as was informed during the Opening Speech of the Sitting by His Excellency Tun, several initiatives have been implemented by the Government to reduce the cost of living of the people in the state through various clusters, by establishing the Affordable Home Ownership (RMM) category, the Pilot Outsourcing Project for Medicine Supply to Pharmacies and Communities (Ubat@Komuniti), intensifying the Urban Agriculture Programme or Community Gardens, creating a local rice brand named 'Beras Cap Feri', and the sponsorship programme for the Unlimited Travel Pass, better known as the Pas Mutiara. All of these are programmes to reduce the cost of living of the people. Furthermore, the State Government has also been involved in the National Cost of Living Action Council under the Ministry of Domestic Trade and Cost of Living. It is hoped that this direct participation by the State Government will help address the cost of living problems, particularly for the people of the State of Penang, in planning initiatives and implementation methods of a quick wins nature as short-term strategies that bring benefits over the long term, through the working groups for the food, education, health, transport, housing, utilities and income clusters. In addition, the issue of the rising cost of living must be addressed by adopting a multidimensional policy approach, including measures to tackle urbanisation challenges such as housing, connectivity, improved education, financial awareness, as well as increasing productivity and income. Most importantly, greater efforts need to be focused on raising the productivity level of the people of Penang.
Dato’ Deputy Speaker, the State Government is aware of and does not deny that there are traders who take advantage of the increase in the service tax rate to hoard or make excessive price increases in the market. To tackle these unreasonable profit-taking or hoarding activities, the KPDNHEP has enforced the legal provisions under the Price Control and Anti-Profiteering Act. Any trader who hoards and is found to have committed an offence under Section 14(1) may be fined up to 500 thousand, or companies up to one hundred thousand for individuals, or be imprisoned for a term not exceeding three years, or both. Therefore, to control this issue, the KPDN has carried out various operations to inspect premises in every district. The operations were Ops Tiris, Ops Menu, Ops Manis, Ops Pantau, Ops Pasar and Ops Catut, in which a total of 40 cases were arrested by KPDN during the operations, with a breakdown of nine (9) cases in the SPS and SPT districts, four (4) cases in SPU, and 27 cases in Timur Laut and Barat Daya, and the compound amounts paid by the premises have now totalled RM 7,200.00. KPDN Pulau Pinang also continues to conduct monitoring and enforcement at every premises to ensure all traders comply with the prescribed regulations, in addition to ensuring the availability of food supplies and essentials. Traders are also reminded to display price tags clearly and not to take advantage by arbitrarily raising the prices of goods. If consumers find that there is an increase in the price of goods, consumers may make a report and channel complaints directly to KPDN Pulau Pinang.
Dato’ Deputy Speaker, regarding Entrepreneurship Development: the programmes carried out with entrepreneur agencies for the year 2024. The State Government constantly works with various State and Federal agencies to ensure comprehensive benefits in developing entrepreneurs, and at the same time acts as a catalyst for the economic transformation of the state, based on the Penang2030 vision under the Achievement of Strategic Initiative Target B4, namely Building an Ecosystem That Nurtures the Creative Industry and Specialised Business Services.
From January 2024 to May 2024, the total number of entrepreneurship programmes carried out together with agencies for Entrepreneurship Development MMK was 230 programmes. Among the agencies involved are the MARA Penang Office (Council of Trust for the Indigenous People), the Penang Regional Development Authority (PERDA), PDC, PHI, the Malaysia External Trade Development Corporation (MATRADE), and various other agencies that benefited 1,162 entrepreneurs. The details of this programme are as follows. There are rather a lot, I think, if I read them all out. PDC, two (2) programmes, 90 entrepreneurs; Penang Halal, two (2) programmes, 98; MARA Office, 36 programmes, 450 people received allocations totalling 539,000 thousand ringgit. Besides that, ladies and gentlemen, PERDA, the Penang Regional Development Authority, also had six (6) programmes involving 129 entrepreneurs. Rural Entrepreneurship Strengthening Support Grant, RM 10,000 per company for the purchase of machinery and so on.
Taking this opportunity, I would also like to publicise the HARAPAN LOAN SCHEME (SPH) under PDC, the State Government, which is a cooperative programme between the State Government and PDC in offering business loans as additional capital for micro entrepreneurs around Penang. Up to 24 May 2024, a total of 4,204 Penang micro entrepreneurs have benefited from this SPH, with loans amounting to RM 29 million. The SPH collection rate at this time is 91 per cent. The remaining fund so far is 5.52 per cent. This means the State Government fully supports by providing loans to all eligible entrepreneurs. Entrepreneur programmes funded by the State Government, 2024.
For everyone's information, Honourable Member, for the year 2024, the State Government together with the entrepreneurs of the State of Penang has participated in several programmes overseas. I remember why Seberang Jaya said, if we go abroad, we will spend a lot of money. So we turned to domestic options. We answered the call to do things domestically; the money does not get spent much, Honourable Member for Seberang Jaya. The latest is that we were involved in the One District One Industry Showcase (SDSI) Northern Region held on 24–26 May 2024 in Ipoh, Perak. This participation proves that the State Government of Penang is always ready to cooperate not only with agencies, but also with other states in efforts to strengthen entrepreneurship development. It means we bring our entrepreneurs here, to other states. Besides that, the State Government is also very concerned and attentive to the needs of traders, in line with the target of the Penang2030 Vision, namely the Provision of Complete Infrastructure and Facilities that boosts entrepreneur development, with a target of 200 business spaces provided by the State Government by 2030. Although the target set was only 200 units, the State Government today has successfully provided 335 units under the supervision of PDC, covering areas in the districts of Seberang Perai Tengah, Timur Laut, Barat Daya, and Seberang Perai Selatan. This does not include the stalls provided by the local authorities (PBT). This means that in terms of the 2030 target, we have indeed achieved it, in terms of infrastructure provided by the State Government. This also does not include the stalls provided by the Federal Government, from PERDA, MIDEC and so on. And God willing, in terms of reality, the support from the State Government and the Federal Government for this effort is indeed very substantial, Honourable Member for Seberang Jaya.
On the proposal for container-concept shops, I will now go to the questions from the Honourable State Assembly Member for Batu Uban. In this regard, I would also like to thank the Honourable Member for Batu Uban for the proposal put forward regarding considering container-concept shops for hawkers in Batu Uban who do not have a permanent licence. This proposal, God willing, we can consider, because Batu Uban is involved with the Municipal Area of the local authority. Our area, the local authority brother we do not have. So we will cooperate with the PBT to facilitate, and the effort to build an entrepreneur area, although it involves entrepreneurs, requires planning that does not contravene the law. Let us, Honourable Member for Batu Uban, can be like me; we discuss a suitable concept for the area. Can you follow that? Okay, thank you, Batu Uban. Programme, entrepreneur programme planning. As we know, the programmes from Penang entrepreneurs will be held throughout the area. I take up the challenge from friends who said that expenditure should be saved, and at the same time, we as the EXCO also have to cut the budget. So the programmes we form are more in-house programmes, moving around the areas, from district to district. We will start the tour in the seventh (7) month; we will begin touring from five (5) districts, and there we will form, we will bring our entrepreneurs and form an entrepreneur carnival to introduce local entrepreneurs.
And I humbly request my friends, all Honourable Members for the constituencies, to get involved and bring entrepreneurs to the programmes that we will hold, and we will inform you. Only we will look for suitable venues. And today, I see several places that we should develop together, whether Education permits or not. We have the Community Hall, we have the Education Hall. But with the budget we have, if we want to hold it in areas with hotels and so on, I can only do it once. Then the budget will run out. So we take the opportunity today to go around the districts; we will use halls and the existing schools, perhaps we can collaborate with schools in an effort to form and develop young entrepreneurs. This is the concept we are bringing: we will join with Federal Departments together with the State for collaborative programmes. Perhaps at the same time, we need support from the departments, schools and so on to facilitate and save expenditure. So, when we save, we can hold many venues. Ladies and gentlemen, in the effort to build entrepreneurs, it cannot be done all at once. If we look at the concept of holding programmes at hotels and so on, we will be limited. And today the concept I am bringing, God willing, we will go around. Honourable Members can look, and can give views, can give venues, but what is important is there must be parking, so people can come easily.
So whichever Honourable Member stands up, saying the traders have no customers. This is the experience: when we want to hold an entrepreneur carnival, it must be in an area that is easy for people to reach, for the crowd, and to develop, because it is the entrepreneurs who will profit.
Minta.
Sila. Silakan.
Supplementary question from the Honourable Member for Sungai Acheh. The River Cruise at Pengkalan Machang has been operating for nearly three or four years now. How many visitors have boarded that cruise boat, and how much expenditure has PERDA incurred? Thank you.
Thank you, my friend the Honourable Member for Telok Ayer Tawar. The River Cruise, if I am right, is under PERDA's management, correct? I was only recently informed, and we have also made several visits. But I have not yet obtained, I did not take the information on how many people boarded or how much was spent. So, if I ask about old matters, it may not be appropriate, I think. So we only think about and plan for what new things can be seen. And if there is an Honourable Member with a new view, I know that the place has already cost us millions. From the information I received, the expenditure has already reached millions. But it has become less attractive because it is not very crowded. Let us think about how, and God willing, perhaps.
Lack of promotion. Not lack. But if we look at Melaka, there is no difference at all. Going up the river is not that big. If we are to compare, the Pengkalan Machang river is bigger than the Melaka River. Honourable Member.
Thank you. I need it. In fact, I need the concern of all the leaders here, including my friends over there. If there are interesting areas, we need to discuss the plans we should make there. And in shaa Allah, invite me over. We can see, we have spent millions; according to the information I received, we have spent millions, and we will
help in terms of promotion. Perhaps we can hold a Pekan Hari, or how about that. In shaa Allah. Next, I would like to go to… (disturbance).
Night market, right?
Ya, terpulang. Nanti kita duduk dalam perbincangan kita, kita ke arah ke arah disitu insyaAllah. Saya ingin mengambil kesempatan ini juga menjawab isu yang dibangkitkan oleh Dewan untuk ADUN Seberang Jaya berkenaan ADUN, berkenaan kadar sewa premis usahawan di bawah Penang Development Corporation (PERDA) yang meningkat secara mengejut dan mendadak. Seperti tadi, saya jumpa dah ADUN Seberang Jaya. Saya maklum saya memang terlibat dalam orang yang menaikkan harga sewa. Tapi bukanlah saya memang menzalim nah. Disebabkan ini adalah disebabkan tiada kenaikan selama 20 tahun. Dan, kenaikan daripada apa yang kami bincang pun tak la sampai tinggi sangat. Tuan-tuan, banyak sebab yang kita naik. Pertama sekali perbelanjaan dah tinggi untuk maintenance. Kadang-kadang saya tengok sewa, sewa ni sampai tahap kalau ambil duit sewa sebulan tu nak pi repair singki pun tak boleh. Tak lepas. Betul Seberang Jaya? Jadi kenaikan itu ada.
Jadi, insyaAllah kepada mereka yang berasa tertekan dengan kenaikan sewa, boleh buat surat permohonan dan maklum pasal apa nak minta kurang. Kerana dia macam ni. Hidup kita senang, simple. Kalau dah ada, kita bantu. Bagi yang mampu untuk bayar zakat, depa dah usaha boleh bayar cukai pendapatan, bermakna dia mampu untuk bayar. Kecuali yang tak boleh layak untuk bayar zakat pun tak boleh, bermakna kita bantu. Boleh tara tu? Ya. Silakan.
Terima kasih Sungai Acheh. Saya faham dari segi apa yang Sungai Acheh sebutkan, memang kenaikan tidak dapat dielakkan. Cumanya, seperti yang saya sebutkan semalam, biarlah kenaikan itu dilakukan secara berfasa. Sikit demi sikit, kerana kenaikan sebanyak RM700.00 mengikut kategori-kategori kedai sebanyak ada yang hampir RM1,100.00, 70% kenaikan. Itu tidak munasabah buat usahawan-usahawan. Tambah dalam pada masa ini, usahawan taklah semuanya boleh bernafas ataupun berniaga dengan selesa. Dan kalau mengikut surat ini, ada usahawan yang terima yang perlu membayar termasuk dengan deposit. Deposit kadar sewaan baru pada bulan Jun, terima dua minggu. Bulan Jun dah nak kena start sewa baru, jadi deposit baru tambah dengan kadar sewa baru dia jadi berbelas ribu jadinya. Jadi, diharap dapat dipertimbangkan semula supaya dapat memberi keselesaan sikit kepada usahawan-usahawan khususnya usahawan Melayu, Bumiputera kita. Terima kasih Sungai Acheh.
Terima kasih Seberang Jaya, InsyaAllah. Saya rasa, saya dah bincang dengan YB Seberang Jaya tentang apa kenaikan tu kita boleh bincang, dan buat surat yang menunjukkan. Dan saya akan membantu, saya bukan hari-hari ada di situ. Tapi, saya akan bantu sebaik mungkin, semampu mungkin kita akan bantu. In shaa Allah. Saya tak mau bukan kerajaan ni, tujuan kerajaan baik Kerajaan Negeri ataupun Kerajaan Pusat mana-mana jabatan bukan untuk menindas rakyat. Tapi adalah untuk membantu sebagai pemangkin untuk rakyat atau usahawan untuk lebih maju ke depan. Jangan 'jegey' saya teruk sangat, Telok Ayer Tawar.
Okey, seterusnya apa saya rasa tak banyak benda yang disentuh tentang usahawan ni. Sebenarnya bila kenaikan ni ada banyak benda yang kita bincangkan tuan-tuan. Mungkin dan ini saya rasa, satu kita tengok kadang-kadang kita kena terima hakikat hari ini bahawa premis, bengkel, gerai-gerai yang kerajaan bagi kita tak mampu untuk menambah. Kalau zaman dulu, kita boleh tambah kedai, tambah gerai. Kerana hari ini di Pulau Pinang, gerai terhad, bengkel terhad yang disediakan oleh kerajaan. Bermakna bila golongan tu dah boleh maju, dah maju kita bagi untuk generasi yang baru. Inilah satu punca yang kita, yang kita kenaikan harga mungkin untuk orang baru kita akan turun tengok di mana yang perlu. Kerana banyak juga golongan saya tengok, hari ini kita pi tengok dah pakai Alphard, pakai Mercedes dan sebagainya. Tapi, masih duduk di gerai Kerajaan. Dengan apa nilai sewa yang rendah, sedangkan generasi baru yang keluar daripada pusat latihan yang ingin berniaga, mereka dah tak dak tapak. Dan pada masa yang sama juga, kita tak dak gerai yang baru. Jadi ini salah satu sebab jangan, jangan kita memikirkan generasi yang yang muda yang untuk apa memberi peluang kepada mereka untuk memberi apa tapak untuk mula berniaga. Begitu jugalah, saya kata hari ini saya selalu dok bercakap kadang-kadang kita di Kerajaan Negeri ditipu oleh rakyat. Bila dia dah naik, dia dok habaq dia susah. Kalau tanya, bila masa susah. Tapi, sebenarnya hakikatnya dia senang. Tapi, tak semua juga kita tau yang berjaya. Tapi, kita akan bantu in shaa Allah. Okay, boleh faham nah. Telok Ayer Tawar okay?
Okey.
Okey, baik. Terima kasih. Seterusnya tuan-tuan, saya terus ke MMK Luar Bandar. Seperti yang kita sedia maklum, Pulau Pinang merupakan sebuah negeri yang kecil yang banyak memfokus kepada industri. Namun begitu, pembangunan luar bandar di Pulau Pinang bukanlah sesuatu perkara yang boleh dipandang enteng. Justeru ini, saya amat komited dalam pembangunan kawasan luar bandar di Pulau Pinang melalui pelbagai agensi Kerajaan Negeri mahupun Persekutuan. Antara inisiatif yang dibangunkan oleh Kerajaan Negeri Pulau Pinang, bagi memantapkan lagi pembangunan luar bandar di negeri ini adalah melalui "Projek Bina Baru dan Membaiki Rumah serta
Bantuan Alatan" kepada peniaga-peniaga kecil. Program ini diselaraskan melalui kelima-lima Pejabat Daerah di Pulau Pinang. Bagi tahun 2023 sehingga kini, bilangan penerima bagi Program Bina Baru dan Baiki Rumah adalah seramai 63 penerima. Manakala, bilangan penerima bagi bantuan alatan adalah seramai 83 orang.
Saya mengambil maklum dan menyambut baik cadangan daripada ADUN Pulau Tikus, berkenaan cadangan untuk mewujudkan Unit Penggerak Khas yang dipertanggungjawabkan untuk menghasilkan kerangka perancangan untuk jadikan usaha-usahawanan bagi menjana hasil kepada Kerajaan Negeri. Cadangan ini akan dipertimbangkan melalui penyelarasan semula struktur dan agensi sedia ada melalui Ahli MMK Pembangunan Usahawanan. Peruntukan Pembangunan KKDW bagi Negeri Pulau Pinang. Untuk makluman Yang Berhormat Timbalan Yang di-Pertua dan Ahli-ahli Yang Berhormat, Kementerian Kemajuan Desa dan Wilayah (KKDW) telah memperuntukkan RM3.5 juta pada tahun 2024 bagi pelaksanaan projek khusus di negeri Pulau Pinang. Pecahan peruntukan ini adalah seperti berikut, Jalan Perhubungan Desa sebanyak satu juta, Program Ameniti Sosial sebanyak dua juta dan Jalan Ladang sebanyak lima ratus ribu. Timbalan Yang di-Pertua. Selaras dengan Dasar Pembangunan Luar Bandar yang menjadi asas dan tunjang kepada segala inisiatif KKDW, terdapat dua daripada 10 teras utama yang berkait rapat dengan portfolio pembangunan usahawan saya. Dan suka untuk saya perincikan di sini. Antaranya ialah teras ekonomi berdaya saing dan mampan serta keusahawanan pemacu pembangunan ekonomi. Memetik nukilan seorang tokoh nusantara, Hamka pernah berkata 'Tegakkan cita-cita terlebih dahulu sebelum berusaha' dan 'orang berakal hidup itu masyarakatnya, bukan untuk dianiaya'. Oleh yang demikian, antara visi utama saya dalam membangun usahawan di luar bandar ini adalah untuk membuat penyelarasan bersama agensi-agensi negeri dan persekutuan dalam memajukan bidang keusahawanan khususnya di luar bandar.
Justeru itu, saya acapkali mengadakan program-program bersama Community Development Department (KEMAS), MARA, PERDA dan Rubber Industry Smallholders Development Authority (RISDA) yang merupakan agensi di bawah seliaan KKDW. Agensi-agensi ini juga mempunyai bilangan usahawan di luar bandar yang signifikan untuk dibangunkan. Program SejaTi MADANI. Dikesempatan ini juga, saya ingin menguar-uarkan berkenaan Program Sejati MADANI yang merupakan inisiatif baharu Kerajaan MADANI yang telah diumumkan oleh Yang Amat Berhormat Perdana Menteri ketika membentangkan Rang Undang-Undang Perbekalan 2024 di Dewan Rakyat pada 13 Oktober 2023. Peruntukan ini sebanyak RM1 bilion telah disediakan dan di ICU JPM telah diberi tanggungjawab untuk menyelia dan menyelaras program-program ini. Objektif utama pelaksanaan program ini adalah, untuk memperkasakan aktiviti ekonomi komuniti dan membuka peluang pekerjaan baharu serta peluang peningkatan pendapatan setempat. Dengan pertimbangan pemberian sejumlah geran RM50,000.00 hingga RM100,000.00 bagi setiap komuniti. Permohonan ini boleh dibuat di mana-mana wakil yang terdiri daripada kalangan Ahli Majlis Pengurusan Komuniti Kampung dan permohonan dibuat secara atas talian melalui Sistem SejaTiMADANI. Mohon setiap Ahli Dewan untuk membuat hebahan dan memberi sokongan, kepada penyertaan pihak MPKK dalam meningkatkan pendapatan komuniti kerana difahamkan bahawa masih belum ada penyertaan dari komuniti Pulau Pinang.
Bukan setakat MPKK ja yang sedia maklum, apa persatuan penduduk juga mampu untuk membuat. Jadi saya harap ada sokongan, dorongan daripada YB-YB yang kita boleh membantu masyarakat dalam usaha menambah penempatan untuk usahawan dalam bentuk komuniti.
YB, boleh? Dato' Speaker. Boleh? SejaTi MADANI, berkenaan SejaTi MADANI. Cuma, proses dia untuk permohonan tu sangat, sangat merumitkan. YB, dia ada kertas kerja yang sangat panjang yang perlu dilakukan oleh pemohon. Kalau boleh kita mintalah untuk simplekan permohonan ini supaya lebih ramai minat untuk mohon program ni.
Yang Berhormat Sungai Acheh. Satu soalan. Program ni memang bagus, kita tengok pasal dia bagi geran tanpa bayaran balik. Tetapi, apa yang cakap Tanjong Bunga tu adalah satu fakta.
Kebun Bunga. Kebun Bunga.
Kebun Bunga.
Belum lagi. Tak sampai lagi, Tanjong Bunga.
Tu fakta yang remeh tetapi, kita tengok pula dari segi yang boleh memohon tu. Saya cadangkan untuk Sungai Acheh bawa ke tengahkan. Makna NGO pun layak memohon untuk Program Geran MADANI ini. Sekian, terima kasih.
Okey, terima kasih daripada Kebun Bunga dan Telok Ayer Tawar. Saya rasa sambutan okay. Dan Insyaallah, saya akan jumpa dengan ICU, kita akan bincang macam mana untuk memudahkan program ini. Tapi sekadar yang saya dapat maklumat tadi, kalau bulan lepas saya dapat baru lima, lima persatuan yang masuk dalam kategori. Tadi ni saya dimaklumkan tak ada lagi. Jadi saya memang betullah apa Kebun Bunga cakap. Saya pun tak jumpa lagi dengan Lembaga-lembaga Pengarah yang terlantik dan in shaa Allah kita akan ada perbincangan untuk memudahkan.
Saya rasa kita kena ambil tahun ini untuk membangunkan komuniti-komuniti yang ada. Jadi seterusnya saya nak ke..seperti yang saya sedia maklum, program-program yang kita bawa untuk tahun ini lebih kepada meringankan perbelanjaan kerana peruntukan-peruntukan yang telah terhad dan saya tidak menjadikan itu satu alasan bila peruntukan dipotong dan saya tidak boleh untuk melakukan tugas sebagai apa…Ahli Majlis Usahawan dan Insya-Allah kita ada sokongan daripada persekutuan, jabatan-jabatan persekutuan yang boleh kita kolaborasi bersama, banyak program-program usahawan yang kita akan teruskan. Inilah peranan MMK Kerajaan Negeri untuk menjadi pemangkin kerana kita sebagai pemangkin kepada jabatan-jabatan untuk bergerak bersama sebagai Kerajaan Perpaduan tidak kira Agensi Negeri atau pun Agensi Persekutuan. Justeru, program-program yang dilaksanakan tidak akan terhenti, dalam tidak akan terhenti dalam keadaan ekonomi yang tidak menentu ini.
Kerajaan Negeri akan mengambil pendekatan dengan melaksanakan program bersama, di mana program-program ini akan disatukan sekali gus menjimatkan perbelanjaan dan memastikan lebih ramai menerima manfaat daripada program ini. Dan akhir, sebelum saya mengakhiri ucapan penggulungan saya pada hari ini, saya ingin merakamkan ucapan penghargaan dan terima kasih kepada Yang Berhormat Setiausaha Kerajaan Negeri, Yang Berhormat Pegawai Kewangan Negeri, Yang Berhormat Pegawai Undang-Undang yang banyak membantu dan menjayakan dasar Kerajaan Negeri. Tidak lupa juga kepada Ketua Menteri, dan semua kawan-kawan EXCO, YB-YB yang membantu dalam memberikan pandangan, pendapat untuk kerjasama. Dan termasuk juga kepada semua ketua-ketua jabatan yang telah membantu secara langsung dan tidak langsung dalam saya menggalas amanah selaku pengerusi MMK Perdagangan Pembangunan Dan Usahawan Luar Bandar. Di sini juga suka saya tegaskan amalan keterbukaan saya kepada semua Ahli-ahli Yang Berhormat yang mungkin mempunyai sebarang cadangan kerjasama tidak kira dalam bentuk penyertaan, penganjuran, penglibatan program dan lain-lain yang berkaitan portfolio yang dipertanggungjawabkan kepada saya. Umpama kata pepatah, kecil tapak tangan nyiru saya tadahkan. Akhir kata, saya ingin mengucapkan terima kasih sekali lagi kepada pengundi dan penduduk Sungai Acheh kerana sentiasa menyokong segala usaha dan inisiatif saya sepanjang saya menggalas tanggungjawab sebagai wakil rakyat dan terima kasih juga kepada Pejabat Daerah SPS, JKR SPS, IADA dan Pertanian yang menyelesaikan masalah pasal pertanian di kawasan Sungai Acheh. Khususnya kawasan Sungai Acheh ini adalah 60 peratus kawasannya melibatkan kawasan pertanian dan 40 peratus melibatkan nelayan dan sebahagiannya (gangguan) sebahagiannya adalah melibatkan yang bekerja di dalam industri. Dan inilah bila ada kerjasama daripada JPS, JKR, IADA, selesai masalah saya, boleh saya tumpu di Pejabat EXCO. Terima kasih semua. Saya mohon menyokong. Wabillahi taufik wal hidayah, Assalammualaikum warahmatullahi wabarakatuh.
Terima kasih kepada Sungai Acheh dan seterusnya saya persilakan Sungai Pinang.
Terima kasih kepada Yang Berhormat… (gangguan).
Wakil wanita…
Honourable Deputy Speaker of the Penang State Legislative Assembly, the Honourable Chief Minister of Penang, Honourable Members of the State Executive Council and Members of the State Legislative Assembly, ladies and gentlemen. Good afternoon, and greetings of hope, greetings of Penang2030, and greetings of Malaysia Madani. Thank you to His Excellency the Governor for the opening speech at the First Meeting of the Second Session of the 15th Penang State Legislative Assembly. Before I begin my speech, allow me to express condolences to the family of the late Nor Zamri bin Latiff, former State Assemblyman for Sungai Bakap, who passed away on 24 May 2024. May his soul be showered with mercy and placed among the faithful. I thank Mr Speaker for the opportunity given to me to speak today on an issue that touches on my portfolio, namely Social Development, Welfare, and Non-Islamic Affairs.
Mr Speaker, this portfolio is not only a large portfolio but also a great responsibility. It covers various categories of community, between men and women, from the young to the old, from birth to death. Directly, it relates to the well-being of the community. This portfolio covers the following aspects. Taking steps to improve quality of life through comprehensive social welfare programmes. Providing assistance and support to those in need so that the welfare of society is always protected. Managing and empowering non-Muslim communities by organising various programmes to foster the values of harmony, mutual respect, and muhibbah. This portfolio looks at outcomes that cannot be measured, but they are an important aspect for the sustainability of the State of Penang. Therefore, I have launched an umbrella initiative themed "Manfaat Rakyat" as a guide for all programmes and initiatives to be carried out under my portfolio. This theme is an action approach to policies, programmes, and initiatives that provide a return to social, economic, awareness and infrastructure well-being, to improve the quality of life of society. With the Manfaat Rakyat approach, we strive to ensure that every policy and initiative implemented has a positive impact on the well-being of the people. Just to share with all Members of the House, there are several initiatives that I have taken as efforts to bring the Manfaat Rakyat theme to community groups. Among them is the organisation of: Manfaat Rakyat Briefings, held to share information on initiatives and assistance carried out by my office with government-linked companies (GLCs), and agencies related to my portfolio, such as the Department of Social Welfare (JKM), the Penang Women's Development Corporation (PWDC), HARMONICO and the Citizenship Unit. Opposition State Assemblymen were also invited and attended the briefing. We also carried out the Manfaat Rakyat Journey, a programme conducted to bring food baskets to low-income families during festive seasons based on the list of BAES recipients. During Hari Raya Puasa, we visited several families in all districts to listen to their problems and strive to help resolve the challenges they face. Seeing these families for myself truly opened my eyes, and I hope to be able to do more for them. One of the families we helped required house repairs on waqf land in Kampung Makam. I received good news yesterday that this matter will be discussed at the MAINPP Asset meeting to obtain approval for a site lease.
Therefore, I would like to take this opportunity to express my thanks and appreciation to the Deputy Chief Minister 1, in his capacity as President of the Penang Islamic Religious Council, who was able to give consideration as trustee of the Waqf Land, in registering the family as a new site tenant on the Kampung Makam waqf land. And my side also plans to organise a Manfaat Rakyat Carnival to bring together all State Government initiatives under one roof so that they can be delivered to the local community. The Penang State Government and the Federal Government have various initiatives and programmes that will bring benefits to the people in terms of income, employment opportunities, monthly assistance, as well as various schemes. However, people in rural or remote areas face challenges in gaining access to all these schemes. Therefore, under the Manfaat Rakyat Carnival Programme, I wish to bring this Manfaat Rakyat umbrella to them, publicise this programme to them, and ensure that target groups receive benefits from the schemes for which they are eligible. This requires joint efforts not only from the government, but also from Federal Agencies, Local Agencies, NGOs, private sector parties and the local community.
As has been stated by His Excellency the Governor in his speech, the State is now facing a deficit and the State's income amounts to only RM500 million. The cost of funding the i-Sejahtera programme has now reached RM50 million. This means 10% of our annual revenue is used and returned to the people. That 10% is financed for the i-Sejahtera programme. So, in the coming years, this amount is expected to continue to increase. So, allow me to share a little history about this programme. This programme was introduced in 2010 as a gesture of appreciation when the State Government had a surplus of profits and decided to share it with the people, regardless of financial status, as long as they are citizens of Penang. However, the State Government is aware that since this programme was introduced until now, the amount of allocation for assistance to the people has continued to increase every year. Given the rather critical state financial allocation, there is a need for us to review this programme. Hence, I greatly appreciate the suggestion of the Honourable Seri Delima to focus payments on targeted groups in need. As the EXCO that also looks at the issue of people's welfare, the i-Sejahtera Guidelines Updating Workshop was held on 29 to 30 April 2024 this year. One of the main purposes of updating these guidelines is to look at the conditions of assistance for groups in need.
With this, I greatly welcome any sound proposals from ADUNs on using these funds in a prudent manner, and that can ease the financial burden of the State without compromising assistance to people in need. People's welfare remains my priority. Cooperation with the private sector and collaboration with Strategic Partners is important now because we not only need funds to sustain existing programmes. But also to involve the community as a whole in a more holistic approach to resolve the issues faced. With the resources collected, we can do things more efficiently and effectively. For example, Yayasan PETRONAS has provided food baskets, while Jambatan Kedua Sdn Bhd and JKP Sdn. Bhd. have contributed Raya clothing. In addition, Smith and Nephew Penang, Telekom Malaysia Sdn. Bhd., as well as the South West Welfare and Burial Rites Association have also contributed food baskets. Not forgetting the Tzu Chi Buddhist Association and Zakat Penang, who also helped a great deal in terms of giving contributions. I express my thanks to all parties who were willing to cooperate in people's welfare matters. The Mutiara Food Bank Unit, which is a continuation of the welfare programme implemented by the State Government, has also expanded its wings through cooperation with the private sector and non-profit organisations such as Food Aid Foundation, Motorola Solution, Stonyhurst International School, LOTUS, Pasar Borang Pulau Mutiara and Hard Rock Hotel. This unit fosters a culture of not wasting food and sharing sustenance by rescuing surplus food through collection from supermarkets, hotel premises, restaurants, and so on. This food is then distributed to identified target groups, including welfare homes, rehabilitation centres, food aid centres and non-governmental organisations (NGOs).
For 2024, among the new initiatives being implemented are, first, rezeki boxes (gerobok rezeki), which were introduced during the last Ramadan by placing boxes at Gurney Plaza to encourage visitors to share their sustenance with those in need. These boxes will be continued throughout all districts of Penang. The Infak RM1 Programme, which is a collaboration with Non-Governmental Organisations for the collection and gathering of funds to be used for the provision of food in retort form. This method ensures that food has a long shelf-life and can be stored as a food reserve of the State Government to be distributed according to needs and demand from time to time, and the Penang World Hunger Day, which was launched on 28 May 2024, with the cooperation of Green Heroes and Care Meals, aims to raise awareness and take initiatives to reduce hunger among the community. This initiative provides hot meals to be distributed to B40 families through cooperation with private companies under corporate social responsibility (CSR) projects. Cooperation with these various organisations gives us the potential to combine existing resources and expand our network to target groups in need. Since we are still discussing financial assistance, I would like to draw the attention of the Honourable Members and Members of the State Legislative Assembly to the issue of hardcore poverty. The Prime Minister of Malaysia, during a one-day working visit to Penang on 5 April last, announced to the media that the target is zero hardcore poor for the State of Penang by 1 June. The Government has removed a total of 4,949 hardcore poor in April this year. However, many parties are still confused about the term "poverty eradication". On this occasion, I would like to explain that the figure of 4,949 hardcore poor is data that was locked in by the Implementation Coordination Unit, Prime Minister's Department (ICU) on 31 January last year only. The data was locked in to enable the ICU to identify the issues of each Head of Household and to find solutions through assistance that can be provided by other relevant government agencies.
However, we must realise that the target of Zero Hardcore Poverty is very challenging because it depends on economic conditions that are difficult to predict and on events that may befall society such as death, health issues, accidents, disasters, loss of employment and other unforeseeable incidents. These unexpected circumstances mean that hardcore poor data is continuously updated in the e-Kasih system because the census verification process and data cleansing process are always being carried out. Thus, difficulties in implementing data cleansing as well as non-uniformity of databases also occur.
Honourable Sungai Pinang, may I interject? When I attended a case briefing at a briefing and dialogue with PERKESO, there was a term used, namely "mudah miskin" (the easily poor). This "mudah miskin" after the 25th of the month, pay, pay, pay, when you get your salary, pay, pay, pay, pay, pay, fall into poverty. Is this also being given attention by whatever the government is called? Thank you.
Thank you to Sungai Dua. Yes, indeed it is not only the hardcore poor that we focus on; the easily poor, as you mean, are also included. Everyone is in our target group too. So the State Government needs to address this issue, considering that various types of assistance are channelled through various agencies to the people of Penang. Therefore, we believe that the database needs to be updated. This will be a proactive action that I will take to ensure that the establishment of a centralised database to coordinate eligibility checks and records of aid recipients can be realised as quickly as possible. I would also like to quote the statement by the Minister of Economy, namely YB Rafizi Ramli, who explained that approximately 25 to 30% of hardcore poor people refuse the offer to join the Poverty Eradication Programme run by the government. In his statement, he also stressed that
these groups are more interested in continuing to receive cash assistance and less interested in income-generating programmes that can help their livelihood in the long term. So, we realise that this cash assistance is only temporary aid. Allow me to emphasise that we need to do our best to not just give them fish, but to teach them how to fish.. (with permission), so that they can (interruption) so that they can be self-reliant and our efforts are more sustainable.
Homeless Transit Centre. I would like to touch on this. As I said earlier, we must ensure that these vulnerable groups can stand on their own. Therefore, at the Homeless Transit Centre, we are implementing various initiatives through collaboration with strategic partners to organise programmes and skills for residents there. For example, we have a motorcycle washing programme that gives residents an opportunity to earn income. In addition, we are also implementing a job-matching programme with private companies to provide employment opportunities for residents. So, a total of 75 residents have obtained jobs as supermarket assistants, security guards, general workers, cooks and so on. So, this is what I mean: if we leave residents staying at the Homeless Transit Centre doing nothing, they will continue to depend entirely on the Government. Therefore, when we give them jobs, they can stand on their own. This indirectly develops these individuals and brings them back to the community. As the EXCO for the MMK portfolio of Social Development, I would like to clarify once again that social development is about developing a person. If we look at a problem and want to link it to social development, we must first assess whether it requires development. This is the role of the MMK for Social Development, namely to engage in developing aspects that require attention and effort to develop individuals in society in terms of policies and programmes to a more advanced level.
One of the target groups given focus through this MMK is women, therefore we emphasise a more strategic approach to help women in terms of economy and social life through PWDC. One of the programmes under PWDC that helps Women's Development now is the PEN-MENTOR programme. Some of you are more familiar with this programme under the name PWEMP - Penang Women Entrepreneurs Mentoring Programme. This programme has now been rebranded as PEN-MENTOR because it is more related to the community as a mentoring programme. The State Government is very concerned about the increase in basic living costs in Penang. To help family members strengthen household financial status, PEN-MENTOR is established as a platform to build and develop women in generating income through entrepreneurship. Therefore, this programme aims to achieve the Penang2030 vision, which is to increase women's business ownership to the level of 40%. Thank you to Seberang Jaya and Bertam for their concern over women's economic issues. For the information of Members of the House, the Penang Women Entrepreneurship has been carried out for four (4) years and has successfully built the capacity of 291 participants, where it focused on
digital marketing, business model canvas and financial management for women entrepreneurs in the small or micro category.
The distinctiveness of this programme is that the mentors involved are experienced entrepreneurs. This programme has successfully increased income by 30% on average among participants. For information, as of today, 282 out of 291 participants or 97% remain active in this entrepreneurship. Thank you also to the Honourable Sungai Dua for his suggestion to reduce shift cycles in factories involving local women so that they can spend more time with their families. Although this is a simple idea to accept, namely to give women more time with their families, I would like to stress once again that we need to view the role of women as more than just caregivers.
Saya minta…
Ya.
Today we see social problems occurring and the institution of the family is also threatened. I think the role of women is very important in the family. Whether she is a mother to her children or a wife to her husband. Therefore this is very important. That is why my suggestion is that the government look at this matter and the government can negotiate with employers, whether in industry or anywhere else, so that an appropriate method or an opportunity is considered for us to uphold the family. Thank you.
Yes. Thank you to Sungai Dua. Yes, I agree, but do I agree that it is not only the role of the mother that is important to the family, or the role of the wife to the husband. The role of the father is also important to the family, and the role of the husband is also important to the wife. So, here I want to say that this role should be held by both men and women, especially as parents, and not only be the responsibility of women alone. Child care is a shared responsibility, and therefore it is very important to obtain support services for working mothers as well. So, to respond to the target of the MADANI Economic Framework to raise the female labour force participation rate to 60% since 2013, the focus of the Penang State Government is to create an environment that enables women to reach their full potential, so that they do not have to choose between pursuing a career and managing a family.
In line with this, the State Government is working to provide suitable taska (child-care centres) specifically for workers who have children. One of these efforts is by increasing the number of taska at private workplaces, and one example is the Kanak-Kanak child-care centre at Micron Technology. There are also nine (9) taska operating within government buildings. With child-care centres like this, they can help parents to continue working, especially in challenging economic situations. In providing an inclusive environment in Penang, the Penang State Gender Inclusivity Policy has entered Phase Two, namely Institutionalising Practice in the DKG Roadmap (Roadmap) 2019 to 2030. In the fifth year of implementation of this policy, the five (5) year DKG report is being prepared for publication. In addition, to strengthen the institutionalisation of DKG, a Gender Inclusivity Policy Committee will be established. So far, the number of DKG Focal Point Officers is 150 people, consisting of State Government agencies, the Penang Island City Council (MBPP) and the Seberang Perai City Council (MBSP). In line with the Gender Inclusivity Policy, the Gender Responsive & Participatory Budgeting (GRPB) methodology at the Local Government level, through questionnaires and the MBPP People's Budget Town Hall 2025, has been held to ensure that the council's budget planning is people-oriented, with input and suggestions taken into account.
Age-Friendly City. According to statistics from the Department of Statistics Malaysia, the elderly population in Penang has reached 7.7 per cent. According to the World Health Organization (WHO), Penang is now an ageing state (Ageing State). In addressing this phenomenon, the Age-Friendly City initiative for Penang Island will implement the Age-Friendly City Action Plan. This plan is based on eight (8) domains set by the WHO in drafting programmes involving the Age Friendly City, in order to create an environment that encourages active and healthy ageing. The implementation of this action plan is together with the Penang Island City Council. The State Government has taken steps to implement Age-Friendly City to create an environment that is friendly to all groups, especially the elderly. The next step for this initiative is that it will be extended to Seberang Perai together with MBSP. For the information of Seberang Jaya, this Action Plan will examine every proposal that has been stated in the debate session, which also falls within the eight (8) domains under the Age-Friendly City framework. The target is for Penang as a whole to be an Age-Friendly State by 2027.
I also want to thank the Honourable Member for Kebun Bunga for his initiative in establishing the first PAWE in the North East District. The JKM team only assisted in the application process, but the initiative was the main driver that moved this effort. Congratulations, and I hope this centre will allow local elderly people to have a place to join community activities and contribute to community development. The issue of elderly people living alone
Requesting the floor. Sungai Pinang.
Sila.
Requesting the floor, Sungai Pinang, thank you. Interested in the ageing society. With the current situation, our Penang is heading towards an ageing society, and there are also many requests for care centres, especially for the elderly. At present I understand there are guidelines that specify certain areas, and within those areas there can only be a few care centres. So I want to ask for an explanation from Sungai Pinang for the future: what is our proposal to support initiatives, whether from the private sector or from the Government, to increase the number of these elderly care centres. Thank you.
Thank you to Batu Uban, who is always very concerned about the issue of the elderly. Indeed, there are certain guidelines and that area. But this falls under the Local Government. We have indeed had meetings. There has been a meeting that has examined the methods and guidelines on the establishment of elderly care centres. We encourage more care centres to be set up, because, because there are indeed many cases. According to the old practice, oh, it is not good to send our mother or father to an elderly care centre, but if you leave your mother or father alone at home, then they will go faster, becoming, ah, more, ah, quickly ageing, right. Sick. Growing old quickly. So if they are in a care centre, they have friends, they have activities, activities. So they will be more active and healthier. So thank you, we will examine it.
YB, may I seek permission. I have visited several elderly care centres in Sungai Dua, and the majority are run by Chinese groups, and the care providers there told me they have difficulties in finance to manage these centres. Can the Government look into this problem faced by them?
Thank you. Indeed there are many care centres, whether established by the private sector or by NGOs. Yes, so indeed for those from the NGO group. They often face difficulties and experience financial hardship. So agencies like these, we will often hold a raise fund, fund-raising. We will also often help them. The State Government thanks such organisations because they provide services on a voluntary basis, but whatever the case, these services need money for them to carry out operations and activities. So we will see and examine how we can help too. With the private sector, and also ask factories or parties that can provide CSR or contribute funds to them. Thank you to Sungai Dua.
Minta pencelahan
Oh ya.
Dato' Deputy Speaker, usually we have proposals for postnatal care homes, tadika (kindergartens), taska, and homes for the elderly. When there are proposals, former Padang Lalang or Sungai Pinang has to bear, bear this responsibility, set up a committee to draft guidelines. This should not be under the responsibility of the State Government Committee (MMK) for Social Development. I hope there must be support or it must be led by both the Local Authorities (PBT) and it should involve, if it is a postnatal care centre or an elderly care centre, it involves both PBT and sometimes the Ministry of Health. When led by the MMK for Social Development or PWDC, there is no strong support, the commitment is not strong enough, not enough commitment, because it needs instructions perhaps from the Honourable EXCO, Local Government or other agencies. We need strong support from all agencies to ensure that the guidelines produced are comprehensive. Thank you.
Thank you to Bukit Tambun. Indeed Bukit Tambun has been with me in meetings to study and examine the guidelines. He is indeed a champion for care centres. Thank you, I say. And indeed there are many difficulties, we face difficulties regarding the guidelines from our PBT. Right, for everyone's information I have already..
Requesting the floor, Sungai Pinang.
I have not finished.
Yes, regarding care centres and also confinement centres. Because this matter has been carried over from the previous term until now, and indeed the reality is that cross-department cooperation, cooperation between different divisions, is a necessity. So I call on this august House: perhaps if there is cooperation between EXCOs from different portfolios, must authority be delegated from the Honourable Chief Minister, I am not sure. This is a reality, that if there is cooperation between different divisions, it requires not only authority but also allocation, it is something real. So I hope, with great hope, that we can get an answer after this sitting of the House. Thank you.
Thank you to Berapit. This indeed falls under the authority of, right, whichever agency, and I have made visits and courtesy calls to the Ministry. Indeed it has problems. If, if it is said for care centres, usually it falls under the licence to be issued by JKM, but before that, the process, that process, they will face difficulties. Right, I also want to call out that from the process for planning, right, which is where we face problems. So there must be leniency from the Local Government, but only for safety issues there is no compromise, right. Although we need leniency in guidelines, safety must be looked at seriously. And Bomba has many conditions. We are bound by those conditions. What troubles operators in setting up their care centres, then we need the ministry to look into this issue. There have already been several meetings with several agencies, with Bomba, with JKM, with Local Government, Health have discussed, but look at which party can give leniency that can benefit and not sideline the safety of the residents living in that care centre. Right, we hope and that all of this we give support because it is indeed necessary. This is the trend right now. Care centres are not only for children. Now it is for the elderly. Right, thank you to the Honourable Member who took part.
Requesting the floor, requesting the floor. This issue is not only in terms of legislation and guidelines from the PBT. This issue also covers public sentiment, where we find that when a place is to be developed as a care centre, there are nearby residents who object. So I hope the State Government can also run a campaign to raise public awareness that we need to sign on to this issue as one state. Yes, thank you.
Thank you, that is indeed a very insightful view, and we will see the scope of that. So before that, we look at it, Local Government needs to make plans for the future so that, so that in future if there are care centres or taska wherever they want to be set up, they can get information or certain conditions, so they can make better plans, right, because now there is a problem from Bomba, namely, if, right, just as an example, we received a complaint that a taska operator. They set up their care centre on the first (1) floor, so it was approved as commercial. But when the floor below came to open a restaurant. It became a problem. They came first, right, they operated first, but who knows the floor below came to open a restaurant, so it cannot. So Bomba will not approve even though they had already been operating before that. So for this problem, I think the ministry and all agencies, please inform us with guidelines or those conditions so that it is easier, to make it easier for operators so they can more easily carry out their applications or complete, complete the conditions, meeting the conditions required, okay.
Now, next. Okay, issue. Earlier I touched on the issue of elderly people living alone, which is also something we are focusing on. Along with Penang moving increasingly towards an ageing state, there will be more elderly people who may live alone. So although we have a home help service, KBDR, the available resources have been fully used and we cannot expand the service to more people who wish to join this programme. Seeing the increasing need, we are now in the process of establishing the Mutiara Community Volunteers, which is a collaboration between the State Government, government agencies, NGOs and the private sector to form a system. NGO members will register as volunteers to visit these elderly people regularly, and as a reward, we will involve the private sector to provide vouchers and other rewards as appreciation for their time and effort in giving back to the community. This effort can also help to maintain community safety through periodic visits. I also want to take this opportunity to call on all members of the House to join me in making this initiative more effective. Members of the House can involve volunteer communities consisting of active elderly people, young people and women in their respective state constituencies (KADUN) to take part in the Mutiara Volunteer Programme.
The Safe Family Policy, which has been established since 2020, is a policy that provides a support system through First Support Points (FSP) for victims of domestic violence. The main purpose of establishing First Support Points is to provide immediate assistance to victims of domestic violence by making referral cases to the appropriate parties. This year is the fourth year of implementation of the Safe Family Policy since 2020, in which we have succeeded in training 456 First Support Points, of whom 173 are members of the Royal Malaysia Police (PDRM). So, to help victims get assistance, PWDC together with PeGIS has set up the mobile application Penang Stop Violence to make it easy for
victims or anyone to identify the nearest First Support Point location. This mobile application has also won the Geospatial World Excellence Award in Amsterdam. So this year the improvement and updating of the Penang Stop Violence application will be carried out, and its use will be publicised to the community, especially on social media platforms, websites and so on. Jelajah Harmoni Seberang Jaya is an Exploration Education Module at the Streets of Harmony Seberang Jaya in Penang, which uses community-based learning and Experiential Learning as the core of this programme. For information, Streets of Harmony Seberang Jaya is a site that brings together nine places of worship along Jalan Todak, Lorong Jelawat 4 and Jalan Sembilang, Seberang Jaya, which consist of multiple races and religions.
Among the main objectives of the Jelajah Harmoni programme is to foster appreciation of the value of cultural, religious and traditional diversity among participants, consisting mainly of youths and students aged 15 to 17. The Jelajah Harmoni programme also involves the communities and places of worship at Streets of Harmony Seberang Jaya, which allows participants to interact directly with those communities, such as interviews with representatives of the places of worship about the activities of the places of worship. So the core focus of Jelajah Harmoni is more to continue the role of each place of worship, especially at Streets of Harmony Seberang Jaya, as a community hub and their activities which also emphasise the welfare and well-being of the communities around them. Therefore, the focus of Jelajah Harmoni is also for participants to understand what values are shared across religions and how these places of worship practise those values. Five Jelajah Harmoni sessions were held in 2023 and this year, HARMONICO will hold 10 Jelajah Harmoni sessions. So far, 127 participants have joined this programme.
The eRIBI System is an initiative of the Penang State Government which is a paradigm shift in realising the modernisation and digitalisation of the management of non-Islamic affairs so that it is more systematic and institutionalised. The eRIBI System supports the aspiration to be a One-Stop Centre and a more efficient and transparent facilitator in the provision of services related to non-Islamic affairs. The main function of the eRIBI System is as a database and inventory of information on non-Islamic places of worship (RIBI). Referring to statistics as of May 2024, the total number of RIBI registered and updated in the eRIBI System is 1,129, of which, by religious breakdown, there are 561 Taoist temples, 204 Hindu temples, 183 Christian churches, 128 Buddhist temples, 10 Wat Siam / Wat Burma, 6 Sikh Gurdwaras, and 37 other RIBI of other religions. In addition, the eRIBI system also acts as an online application platform for the Trust Fund/Special Allocation for Non-Islamic Places of Worship of the Penang State. The MMK for Non-Islamic Affairs of the Penang State Government, through Perbadanan Harmoni Pulau Pinang (HARMONICO), will focus all efforts on transforming the manual financial assistance application process to online to improve the quality of service and implementation of this system. To increase the number of sessions
on discussions regarding the implementation of the eRIBI system, a briefing on the eRIBI system to the Honourable ADUN... (interruption).
Sungai Pinang, please wrap up, two minutes.
Okay. The officers of the State Constituency Office (KADUN), and the management of the Non-Islamic Places of Worship (RIBI), will also be involved. This briefing aims to explain the functions and use of this system. In addition, HARMONICO will continue the "Outreach Session with RIBI Management" and the "Mobile Counter for eRIBI System Registration at the KADUN Office" efforts to increase the amount of RIBI data in this system. Furthermore, eRIBI system registration has also been made one of the mandatory requirements when applying for allocations. This step is hoped to help intensify and increase discussion sessions on the implementation of the eRIBI system with all interested parties.
Okay, that's it. There's still a lot more.
Belum-belum.
Okay, I'll end here.
Yes, yes. Before I do, I'll summarise, okay.
Don't summarise too much, just summarise straight away.
I welcome the proposal put forward by the Honourable Air Putih regarding the increase of allocation by RM3.3 million to RIBI in need. Such an initiative is in line with the manifesto presented by the Penang State Government, namely channelling RM2.5 million every year
to RIBI through the Non-Islamic Affairs Allocation Account, under the Y.A.B Chief Minister, in order to continue meeting the needs of RIBI in the State of Penang.
Sekian, wabillah.
Can I have it? My portfolio is big, you know. Big, welfare. We're talking about welfare. I want to continue. So thank you. So we have the Penang State Non-Islamic Places of Worship (RIBI) Trust Fund and Special Allocation Committee, which has certified and approved 43 applications. 43 have been approved. That's answered, yes. So before I get to the closing, I would like to answer two questions raised by State Assembly Members (ADUN). The first is to the ADUN for Penanti, on the question raised regarding permission to verify applications on the i-Sejahtera form. Allow me to explain to the Honourable Member and all State Assembly Members that a review and whitelisting of access to the i-Sejahtera system has been carried out. The reactivation of user IDs is granted in a controlled manner and fully monitored by the State Government. The second is from Pulau Betong, which reported a fire accident involving 3 people who died. So assistance from JKM and counselling is needed for the survivors of the fire. I also sympathise with the incident that occurred. All forms of assistance will be channelled, whether in the form of financial aid, moral support, counselling and emotional support for the victims. JKM went down to the ground on the day of the incident and JKM will also expedite all forms of assistance that can be provided. Honourable Member and all Members of the House, the portfolio entrusted to me is difficult for me to carry out alone, because this responsibility covers the social and welfare needs of the people as a whole.
Therefore, I greatly appreciate the support of my fellow EXCO members and would like to extend a thousand thanks also to all parties, including government departments and agencies, NGOs, as well as communities and private institutions that have helped the State Government implement programmes for social development, welfare and non-Islamic affairs for the well-being and prosperity of the people of Penang. This portfolio and responsibility covers everyone from newborns to the elderly in their twilight years. However, with the support and backing of everyone, we will certainly achieve what we aim for, even in critical times.
Sailing upriver because of the captain, assisted skilfully by the boatman, young or old, no one will be left behind.
Going into the jungle to seek rattan, rattan taken to make baskets, initiatives for the people's benefit must be planned, so that the people may live in peace and ease.
So I ask for your support. Thank you.
Thank you, Sungai Pinang. Since there is one female EXCO member, let's give her the opportunity. Okay, next, let's invite Paya Terubong.
Thank you, Dato' Speaker. I stand to wind up on the topics of tourism, tourism and also the creative economy raised by Members of the House. According to the latest information from Tourism Malaysia, for the year 2023, the number of tourists staying overnight in hotels in Penang was 7.27 million people. This figure shows an increase of 30.2% compared with the same period in 2022, namely 5.58 million tourists staying overnight in Penang. This positive increase shows that Penang always remains the choice of domestic and foreign tourists, in line with the aggressive efforts carried out by the State Government together with industrial players to promote the State of Penang, especially in the eyes of the world. As a result of this increase, new hotels such as The George Penang, Marriott Hotel have been opened and are in operation. There have also been announcements that new hotels will open within the period 2024-2026. Among them are Crowne Plaza Penang Straits City in Seberang Perai, HARRIS Hotel in Sunshine Penang, Citadines Tanjung Tokong, LYF Georgetown Penang, Iconic Marjorie Hotel, Intercontinental Penang Resort, The Westin Penang and Le Meridien Penang Resort. This shows the confidence of hotel operators in the positive development of the tourism industry in Penang. I read it, Mr Speaker. Today Star Metro also carried a three-page report on hotels and the achievement of tourist arrivals on the rise in Penang. There are three pages of the report with pictures. We can see all references on how, in particular, the increase in tourist arrivals in Penang, and I think this is a positive report, and Star too, they know I am winding up today, they made the report today as well. Hotel fee collection. Honourable Members raised the collection of hotel fees. The hotel fee was introduced by the Penang State Government to finance tourism development and promotion programmes in Penang. Every hotel must collect the hotel fee: for three-star hotels the rate is RM2/night/room. For four-star and above, RM3/night/room. And to answer the questions and issues raised by the Honourable Air Itam and the Honourable KOMTAR, the hotel fee collection since its introduction is as follows: in 2014, I round up to about RM3.5 million, 2015 RM8.6 million, 2016 RM9.4 million, 2017 RM9.8 million, 2018 RM9.6 million, 2019 RM9.4 million, 2020 RM3.5 million, 2021 COVID RM92 only, 2022 RM3.8 and last year 2023 RM10.63 million, 2024 (until April) RM3.7 million. Therefore, we have collected RM72.16 million. Ten years of collection. To answer the additional question on hotel fee collection raised by the Honourable Air Itam, I have placed an additional information answer for the Honourable Member, and it is estimated that about 88% of hotel fees come from hotels in the Island area, and the other 12 percent from Seberang Perai. That is the answer to the Honourable Air Itam. As an effort to diversify and increase State Government revenue, the State Government has decided that the hotel fees collected be placed into the State Consolidated Revenue Account as state revenue. The State Government will channel part of the allocation from that revenue to Penang Global Tourism (a subsidiary of the State Government), PICEB Sdn Bhd (a subsidiary of the State Government), and MMK Tourism and Creative Economy for Local Authority (PBT) tourism programmes. For the year 2024, an allocation of RM1 million has been given to MMK Tourism and Creative Economy to be used for tourism-related programmes. That is my answer to the Honourable Member regarding the hotel fee. Before, after that, I will move on to entertainment tax.
In answer to the question from the Honourable Air Itam regarding entertainment tax: it is administered under the Entertainment Duties Act 1953. Entertainment duty has a list, very long; I will only mention a few: stage dramas, dances, music performances, lectures, circuses, sports games. Entertainment duty is also imposed on non-ticketed entertainment centres such as karaoke, pubs, discos, nightclubs, snooker, family entertainment centres, fun fairs, roller skating rinks and others at certain rates that have been set. Therefore, it is a very long and comprehensive list. Therefore now, the government is reviewing the entertainment duty rates to make them suitable for the current situation. I will move on to the next topic... (interruption).
Seeking clarification. Thank you, Paya Terubong. Paya Terubong did indeed state that the total hotel fee collected is about RM70.1 million, correct? million. So based on this collection and the feedback that was given that for 2024 only RM1.1 million has been allocated to MMK Tourism for promotion. Does the Honourable Member feel that this allocation is sufficient or proportionate to what has been collected from this hotel fee, thank you.
The Tourism portfolio is not a cost centre, we are a profit centre. We actually generate, we earn income through hotel fees, through various conventions and exhibitions that have been held, which have become a very important sector in Penang, and apart from semiconductors and factories, tourism is the second most important service and tourism sector for Penang. Therefore, perhaps if we keep asking, if our hotel fee can generate RM10 million, we only get 10%, only RM1 million. Therefore, if the Honourable Members don't get angry with me, if there is no allocation, no support for small programmes, it is because we need to focus on big programmes such as state-wide programmes like Bon Odori, like the Penang International Dragon Boat Festival, like the Penang Bridge Marathon and the Chingay parade, and various state-level programmes. Therefore, we may not be able to support it, because of this big cut we cannot support the small programmes in your areas, and we see that it is indeed not enough, I am frank, it is indeed not enough, and not only is RM1 million cut, but programmes are also cut by half, as was revealed by Bukit Tambun, which was revealed, we did not say it, but it was revealed, and GLCs too. And we will face challenges, because we face challenges because we compete not only with Selangor, with KL, we compete with flights from Bangkok, Singapore and other international cities. When other places can provide incentives, because when we say direct flights, we sometimes need to give marketing fund incentives so that they can launch the direct flight to Penang. If there is no marketing fund, they ask me, I go and meet them, they ask me, and it is difficult, difficult to get meetings.
Mohon mencelah.
Ya silakan.
Congratulations to the EXCO and the department for promoting many things about the State of Penang that generate income for us, okay. However, in promoting the State of Penang, we must be careful, because I am giving this reminder, for example, I also don't know where this came from, this is not for Penang. This example, they wrote here, "did you know Malaysia welcomes RM25 million visitors anally", not annually, so in Malay it means something obscene, a language that is not nice, but... (interruption), okay, it's fine, but let it not happen in Penang, so we must have monitoring from perhaps MOTAC or the Local Authorities to ensure this is monitored, because this is the image of our state. Secondly, in carrying out promotion, we must carry out monitoring, for example, programmes like this, LGBT programme, using the logo of the State of Penang, this in 2023, 2011, so, so, such things we must be careful, I will give this to the EXCO, yes later. ... (interruption). Here is the Penang logo, yes, 2023, okay, all of this was printed out, so such things.
Penanti Penanti.
Ya.
May I ask where you obtained this letter?
Someone sent this to me.
Yes, I know, but if the source is not correct... (inaudible), it will confuse people.
It's like this. I told you just now, this is to remind us to be more...
Yes, I understand, and when it is quoted in the House, they will remember us as the ones who did it, so if possible, please inform us where this source was obtained.
We know these things can be edited, okay, that's why I said just now, to remind us to be careful in guarding the promotion of our state's situation, so I will pass this to... can be given to the EXCO. That's all, EXCO, it's nothing, just a reminder to enforce monitoring.
Okay, where were we. Okay, therefore... (inaudible).
We need an explanation before continuing. Just now the Honourable Air Itam said RM70 million was collected, this year only RM1 million was received, giving an impression that out of the RM70 million collected, only RM1 million was disbursed. In fact, the RM70 million was collected over many years, not for this year's RM1 million. Previously, everything collected was indeed disbursed for promotional purposes and went directly not into the revenue account but straight to Penang Global Tourism.
Thank you, Chief Minister, because just now I already mentioned that the government channels allocations from that revenue to PGT and also PICEB and MMK, plus RM1 million, because for the State Government to give allocations to PGT, to PICEB also from that revenue, and I think this which was shown, I think this is baseless, this is not from our package. This is not from State Government publicity, we can, we can cut it from the Hansard if possible, both of these are not State Government programmes, yes, this is not the State Government, I also don't know where the source is, if you know, the Honourable Member can tell the reporter that this has nothing to do with the State Government, and yes.
Dato' Deputy Speaker, just now you mentioned because Paya Terubong mentioned that allocations have been cut and it focuses more on programmes of international or state level, therefore I would like to get an explanation from Paya Terubong about things like the Penang Marathon. Does the Penang Marathon generate income, is there a surplus of income for this programme? Secondly, can MMK Tourism focus more on state-scale or international programmes that can generate income, not just promotion where we spend allocations without direct returns. Answer.
Paya Terubong.
Ya.
Regarding the hotel fee, I also want to know whether there is a monitoring system for the collection of this hotel fee, because perhaps it will collect more, so Paya Terubong can get more of all this. So, is there a monitoring system for the collection of this hotel fee.
To answer the questions just now. Of course we can focus on activities not only of promotion but also through conventions and conferences, which can generate hotel stays, so that these participants can fill the hotels in Penang. But it is not counted as State Government revenue, it can be counted even if they stay at a hotel and then pay the hotel fee, which I said just now is RM2.00, RM3.00, that comes back to the state as revenue, but directly, directly it has not yet been generated as revenue. For the Penang Bridge International Marathon, we have a title sponsor from Aspen and Klippa, and for all major activities we try to get sponsors from the private sector too, including Bon Odori, we have a private sponsor, and for the Penang International Dragon Boat, we have a private sponsor. We have to do marketing to get them, because the expenditure has also been cut for these activities, and later I will mention in the next speech about matters related to that, and regarding hotel fees, actually it is under the collection of PBT, MBPP and MBSP (Penang Island City Council and Seberang Perai City Council), then channelled to the State Finance Department, and I, I indeed accept the proposal of the Honourable Kebun Bunga, we need to adopt it because we need better monitoring so that hotels do not... it is not leakage, it does not happen, non-reporting, they do not report fully and so on. I think I will remind the State Finance Department to set up a stricter mechanism so that this can be generated as revenue for the state.
I want to ask so that we are clear, so there is no confusion, whether the amount collected depends on the number of tourists. But what percentage will be given to PGT or MMK Tourism, because the intention of the hotel levy is at the State Government level or at the Central level, the Central level also has a hotel levy. After this it will be channelled to the State Government, so we want to know what percentage of the hotel levy in Penang is given to MMK and also PGT to promote tourism and also from the federal, the Federal Government, what amount has been collected and how much has been given to the State Government and the amount distributed to MMK Tourism, because if I am not mistaken RM10.00 is charged for each room by the Federal Government. Thank you.
Throughout my time as EXCO for tourism, we have tried to get that figure. Only last year, after August, we received just a few thousand ringgit from the tourism tax. This year alone, it has not yet arrived. Therefore, from the federal tourism tax, the amount we get is only a few thousand, and perhaps they will disburse it at the end of the year, and we still usually do not know what the amount is. Therefore we only rely on the Ministry of Finance to make that disbursement, and with regard to the hotel fee, the budget for PGT and the budget for PICEB. The budget for PGT plus PICEB and also MMK Pelancongan, the RM10 million that we collect for this hotel fee is actually enough, I mean when divided among these three entities it is roughly that amount, there is nothing more, including if the allocation for PGT, if I am not mistaken, is roughly RM6 million, which is only enough for office financial operations and also promotional programmes such as roadshows. For example, we hold roadshows in Xiamen, we hold roadshows, and right now PGT is at IPP China in Shanghai. If I, I am not, I am not leading, leading the delegation because I am at the DUN (State Legislative Assembly), where the MOTAC (Ministry of Tourism, Arts and Culture) minister is there with several other state EXCOs, and the expenses for the ITB China roadshow in Shanghai come from the PGT budget, la. Therefore we do not have hotel fees as in previous years. We used to have hotel fees for tapping, we used to have hotel fees for tapping, so we could hold major programmes, such as when I gave the answer to the Honourable Member for Air Itam earlier about the Penang International Food Festival, which used the hotel fee of RM1.2 million. We do not have such facilities for this. In previous years, we had, as in last year, we had the 2022 ITB Asia in Singapore, spending RM393 thousand using the hotel fee, and now we do not have such facilities in 2024.
Will the Honourable Member's side request that all the hotel levies collected be disbursed for tourism promotion, as stipulated for this purpose, la, and when we collect the hotel levy, what we say is for, for the promotion of tourism or for heritage, to preserve heritage, so from the perspective of this purpose I think it is not a problem, but we also do not know what percentage, whether all of it is disbursed or only part of it.
It is, it is included in revenue. Ok, last year we collected RM10 million, so it is included this year too, I expect it to be better than RM10 million. So it will be included in the consolidated fund account, the account is revenue, therefore within that revenue we have a budget for PGT, a budget for PICEB, a budget for MMK Pelancongan and Ekonomi Kreatif.
Not the full amount la.
Not a full amount la. Previously we had a budget like this plus RM10 million, so, so that is why we have a reduction from RM10 million to RM1 million, that is the problem, that is what is not good. However, we will see how we can use resources from the private sector or the federal side to, for us, continue our work. Regarding direct flights, to date there are 15 international cities with direct flights to Penang, 15 cities, and the 16th international city that we will open is Shanghai this Saturday, 31 May 2024. On the domestic route side, we have 8 domestic routes, domestic flights. The total passenger movement at Penang International Airport was 6,979,748 passengers, an increase of 64.5% compared with 4,242,997 passengers in 2022.
Of this total passenger movement, international arrivals have increased by 156.17 per cent. But arrivals, okay, for the first quarter of 2024, the total passenger movement at Penang International Airport was 1,756,584 passengers, a little less. Domestic is slightly reduced compared with last year. And the total passenger movement of international arrivals in the first quarter of 2024 recorded 922,551 passengers, an increase of 27.54% compared with the first quarter of 2023. In answer to the question from the Honourable Member for Batu Uban, we have held a roadshow in India. January, I visited India in January this year and we went to several cities. I visited Delhi and met with an airline in India. And they showed a very great interest and
because after COVID many airlines need to place aircraft orders. They have to train pilots, train ground workers, stewardesses and so on. And they expect to have a flight, to start a direct flight from Chennai to Penang, expected to begin in December 2024.
Yes. I ask for the Dato' Speaker's permission to interject. Regarding direct flights, does our side have statistics on passengers from Penang to that destination and vice versa? Because this is important to show whether such a direct flight generates tourism in Penang or encourages our people to travel to that destination.
What I have is statistics on arrivals, the arrivals of tourists, and I may be able to do a bit of analysis based on the Honourable Member's request, for example the chartered flight from Hainan. We have a chartered flight from Hainan where many of us go, while the other way there are fewer.
So we lose out.
Yes, the fewer ones are the chartered flights, la. We also, but to sustain a direct flight that is sustainable, there must be two parties. Therefore, opportunities such as in China, many of us go, many of them come, so the flight, like the inaugural flight this Saturday, is almost full already from Shanghai. The first flight from Shanghai is almost full already. So I will go to the airport at 11 p.m., it arrives late at night. So to welcome the first flight from Juneyao Airlines that will arrive from Shanghai. So I think we also face challenges from the Middle East, even though we started direct flights to the Middle East, to several cities, Dubai and Doha. We also face challenges because the passenger capacity going or coming is still not nearly full. So that is our challenge, whether, although we can encourage more direct flights, we must help airlines to do promotion and marketing so that there is two-way passenger movement, so the flights can be sustained and continued.
And regarding cruise ships, and cruise ships, also our cruises, we also obtained a good record because the number of international cruise ships berthing at the Swettenham Pier Cruise Terminal in 2023 was 156 ships, an increase of 85.71% compared with 84 ships in 2022.
And also an increase in passengers. There was an increase in international passengers at the Swettenham Pier Cruise Terminal, increasing by 30.56% in 2023 compared with the same period in 2022. Therefore, there is a good increase. Regarding museums. The National Level International Museum Day Festival was held for the first time, the first in Penang, organised by the Penang State Museum Board. This prestigious International Museum Day was attended by about 1,000 museum practitioners from all over Malaysia, including regional institutions from neighbouring countries and international ones. And as many as 214,000 visitors came to enliven the International Museum Day Festival this time in Penang. And various events were arranged. And I take note of the debate by Pinang Tunggal. Pinang Tunggal is not there. And I have also reprimanded the organising committee regarding the incident mentioned by Pinang Tunggal, and I hope the organising committee will not repeat what happened on that day.
And regarding archaeology. The Guar Kepah Archaeology Centre Project, this is in Seberang Perai. I think perhaps in the Penaga area, it is already in the final phase of development. And the Guar Kepah Archaeology Centre is expected to be completed by the end of 2024, taking into account the phase of transfer of the Guar Kepah skeletons and artefacts. And this Guar Kepah Archaeology Centre has an educational tourism archaeology concept covering various components, including interactive exhibition space, seminar hall, shell midden site, administrative space and facilities for visitors such as a surau and toilets. Our archaeological trail, we will begin from Gua Kelam in Perlis, Sungai Batu and Lembah Bujang in Kedah, and Guar Kepah in Penang and in Lembah Lenggong in Perak. And what is the biggest discovery in the gallery is the archaeological site called Penang Women, whose carbon dating is expected to exceed 5,000 years. Therefore, we can state that in prehistoric times there were settlers in the Seberang Perai area for more than 5,000 years. Heritage buildings. Honourable Member, the State Government always attaches importance to heritage buildings. And recently the State Government gave permission under the National Heritage Act 2005 for Rumah Teh Bunga, Jalan Hutton, to be a heritage site, and the next procedure will be gazettement by the Federal Government under the National Heritage Act 2005.
At present, Penang has 11 national heritage buildings that have been gazetted as heritage sites under the National Heritage Act 2005. Among others are the Cheruk To'kun Inscribed Stone, the Penang Museum Board Building, the Municipal Building (Penang City Council Hall), the Big Clock Tower, the Tomb of Sheikh Omar, St. George's Church, Masjid Melayu Lebuh Acheh, Kapitan Keling Mosque, Leong San Tong Khoo Kongsi, the Penang High Court, Penang Free School, and the 12th, which is Rumah Teh Bunga, which will be gazetted and finalised by the Federal Government under the National Heritage Act 2005. And in addition, I would like to give an update on the development of tourist attractions. Many have asked about the tourism Cable Car Project at Bukit Bendera, which will begin construction on site and is a tourism product that we are eagerly awaiting. Likewise with the opening of Gurney Bay, which is based on the waterfront with
the master plan concept of Gurney Bay that has been opened to visitors. Furthermore, there are also several other attractions such as Ferringhi Bay, the longest beachfront container boulevard in Malaysia, the Penang Waterfront Convention Centre which is in the process of construction, and the restoration works of Fort Cornwallis are expected to be completed by the first quarter of 2025. This project is undertaken by George Town Conservation and Development Corporation (GTCDC). To answer the issue raised by the Honourable Member for Air Itam, the Estimated Economic Impact method, or EEI, used by PCEB, Penang Convention and Exhibition Bureau, is calculated using the same indicators as the Malaysia Convention and Exhibition Bureau (MYCEB), and this formula is approved by the Department of Statistics.
The formula used to calculate congress or conference events consists of several factors included in daily expenditure, such as payment of conference fees, payment for hotel accommodation, transportation around the hotel and destinations, payment of flight tickets, expenditure on food and beverages, shopping expenditure, and expenditure involving suppliers involved in business events such as caterers, printing, marketing and so on. And we use this EEI calculation. It does not mean that the impact is to the State Government or the Federal Government, but to the economy as a whole. These EEI figures are an estimate of the impact on the overall local economy. And the EEI calculation according to The Business Events Penang 2023 Annual Review issued by PCEB, the EEI calculation totalling one billion is the estimated economic impact on 604 business events throughout 2023 in Penang. It has, it is simple, the statistics show there were 604 business events throughout Penang.
Of these, PCEB supported 66 events with the attendance of 73,843 delegates who brought an EEI of six hundred zero one million, which is 53.07% of the total 2023 EEI. What I mean is, when an event like V Conference, I think V Conference is an event by an international marketing company. They hold a huge conference in Penang. I attended twice. Last year I attended in September. The attendance was 9,000 delegates from international sources, not only from India, but from the USA, from Europe and so on, 9,000. Therefore, when they hold it for three nights, five nights, you know, at the Spice Arena venue. And they fill the hotels. They fill the hotels, hotel rooms, not only in Bayan Baru, but all the way to the city, all the way to Bukit Mertajam too. Because you have to find thousands of hotel rooms, the second V Conference that I attended this month had 6,000 attendance from international delegates, and this also filled the hotels. So all these calculations have a formula, they calculate how many hotels, how long the conference, flights, caterers and so on. Then these events bring a big impact, not directly to the State Government, but to local economies. For example, when we hold conferences, such as the Penang International Dragon Boat Festival, the hotels in Batu Ferringhi and Tanjung Bungah will be full because we bring about 1,000 to 2,000 participants and they will fill those hotels. So these big events, these major events must continue so that participants are brought, bringing participants not only local, not only from Malaysia but international, to come to Penang to spend, to fill the hotels and so on. Therefore, the aspects that generate income for our economy have a formula, as I said earlier, the estimated economic impact.
To answer the question raised by the Honourable Member for Teluk Bahang, is the Honourable Member for Teluk Bahang here? Oh sorry, yes. Making the traditional village in Balik Pulau a heritage village under UNESCO. In fact, there are 10 criteria for designating a site as a UNESCO World Heritage Site. In Penang we have George Town, we together with Melaka, and there are 10 criteria: must represent human creative genius; must show an important interchange of human values; must contain details of civilisation; must have a sense of wonder about a building; must have a sense of wonder about a place; must have a close association with an event; must have certain traditions; must contain extraordinary natural phenomena or natural beauty and aesthetics; must represent major stages in the earth's history; and must have features that have an important ecological and biological role, and there are 10 criteria, its conditions. Therefore, if, if any site can meet those criteria, we can consider it, however any nomination or proposal as a UNESCO heritage site must go not only through the State Government but also through the National Heritage Department to be submitted to UNESCO. Therefore, the conditions must be met, and for now we still have not been able to identify, although we have identified several areas that need to be preserved and maintained as they are, but it still cannot be raised to become a World Heritage Site. And to answer the question of the Honourable Member for Teluk Bahang and Pulau Betong, the Southwest District and Land Office has identified several projects suitable for implementation at Pantai Malindo and has applied for allocation from the Ministry of Rural and Regional Development to be implemented in the 5th Rolling Plan of the 12th Malaysia Plan in 2025 for Malindo, and the District Office has submitted the application to the ministry and the latest status is that it is still awaiting the decision on that application. And that is all I wish to convey, I think...(interruption).
There is a question from the Honourable Member for Paya Terubong.
Silakan. sila.
Honourable Member for Paya Terubong, Mr Speaker. The Honourable Member just now said we want to attract many tourists to Penang, and also local tourists, most of the tourists here in Penang. On the Seberang Perai side, I see the Honourable Member as EXCO.
Tourism must look ahead. Look at the area of Teluk Ayer Tawar. Now, at Teluk Ayer Tawar, every Friday, Saturday and Sunday, at Kampung Tersusun in Teluk Ayer Tawar, there are so many people, sometimes nearly 1,000, 500 people, on the shoreline bringing their children to bathe there. What we see at that place is that in the past people went to Batu Feringghi. When people from the Seberang side wanted to go to Batu Feringghi, it was jammed, so they came to Kampung Tersusun, Teluk Ayer Tawar. So many people, there are even wedding plans, candlelight dinners at night, celebrations, everything is already there. I ask the Honourable Member for Paya Terubong to consider that this is also a tourist attraction. That beach at Teluk Ayer Tawar is beautiful. But in the written reply to me, all the written replies on tourism that I sent, there was a mistake in meaning just now. Kampung Tersusun is not behind Masjid Jamek Teluk Ayer Tawar. Masjid Jamek Teluk Ayer Tawar is in Teluk Ayer Tawar. But this is common, I just want to give an accurate report. But it was not me who said it, YB Pantai Jerejak said it just now. It means YB Sungai Dua said one more thing, you cannot say we must answer and have given information in the House, it must be accurate. But I do not dispute this one, I just understand it. But it was not me who said it, YB Pantai Jerejak said it just now. We asked, it was not me who said it, YB Pantai Jerejak said it. Three (3) times I have said it was not me who said it. YB Jerejak said it. Thank you, YB Paya Terubong.
Sometimes ADUNs also already know the answer but still ask. They want to test us, whether we, sometimes from the sea side, are not familiar with places in Teluk Ayer Tawar. If later we correct what is wrong, that's all. Thank you.
Dato' Speaker, last last. Okay, maybe this is for consideration by the EXCO for Tourism. Recently I also learned from a friend from abroad, actually, when he told me, I was also shocked about what is happening with Bukit Bendera. This friend said he asked me, he knew I was from Penang, he asked me, do you know Bukit Bendera? I said of course I am from Penang. Then he said, do you know Hayao Miyazaki? I also thought of a famous animator, Hayao Miyazaki. Then I asked, why? So he told me that actually in his country, China, many people on their social media come to Penang because of Hayao Miyazaki. I was also, eh, shocked, why? So he said the people who come here do their own social media marketing, linking the atmosphere and scenery at the existing Bukit Bendera with the animation and comics by this animator, and this animator is indeed very famous all over the world. Two of his works won the Oscar, best animation. After that I called Penang Hill Corporation and asked, do you know about this issue, Hayao Miyazaki? We really did not know. And actually this is under current.... (requesting permission). That's happening that we don't know, we have a hidden. We have something that naturally serves as an attraction because of a person who is very... famous for his works, and therefore perhaps this is a suggestion or consideration for the EXCO for Tourism to see how to leverage this advantage. Thank you.
Maybe we have to learn Japanese too, I don't really know much. Okay, thank you for the suggestion of the Honourable Member for Pulau Tikus. Noted, thank you.
Thank you, and I now invite the Honourable Member for Tanjong Bunga.
Thank you, Dato' Speaker, and thank you to all Honourable Members. Alhamdulillah, the First Meeting of the Second Session of the 15th State Legislative Assembly has been able to run smoothly from the first day until today, 24 May 2024, from the first day, 24 May 2024, until today, 29 May 2024. Various information and future plans of the State Government have been explored and debated in the time available. Many questions and suggestions from Members of the House have also been raised. I hope that with my winding-up, I can answer the questions of all Honourable Members.
Dato' Speaker, the provision of infrastructure and services for the 5G network in Malaysia is implemented by the company Digital Nasional Berhad (DNB) under the Ministry of Digital as the sole neutral party to provide 5G coverage and capacity services wholesale to licence holders of Network Service Provider (NSP). The implementation plan for the provision of 5G infrastructure and services throughout Malaysia has been prepared by DNB and is being implemented in phases. The first phase of the project, namely Phase 1A, involves the Klang Valley area, namely Kuala Lumpur, Cyberjaya and Putrajaya, and began in 2021. Penang falls under Phase 1B and began in the second quarter of 2022. Up to April 2024, a total of 414 5G transmitter stations have been completed and are operational out of the 449 planned. This covers 90.8% of populated areas. This achievement is the result of the commitment of the State Government as the main coordinator together with DNB, with the cooperation of all State Government departments and agencies and the Federal Government. The State Government also targets that all remaining 5G transmitter station locations will be completed by the end of the second quarter of 2024. In addition, for 4G network coverage, Penang has achieved 99.88% mobile broadband coverage in populated areas. The State Government will continue to be committed to improving 4G coverage in areas with capacity and Internet coverage problems. Starting from the second quarter of 2024, the State Government has taken a proactive step by setting up a committee to monitor and ensure that the development of communication infrastructure is completed according to the schedule and time that has been set. As for the average mobile broadband speed, Penang has achieved 195 Megabits per second (Mbps), exceeding the national target of 100Mbps in the National Digital Infrastructure Plan (Jalinan Digital Negara).
Next, the implementation of the National Information Dissemination Centre (NADI), previously known as the Digital Economy Centre (PEDi), is led by the Federal Government through the Malaysian Communications and Multimedia Commission (MCMC), with cooperation from the State Government. The Most Honourable Prime Minister announced the addition of 38 NADI centres in Penang on 11 errr.. 16 February 2024. The State Government takes this opportunity to express its highest appreciation to the Most Honourable Prime Minister and also the Honourable Minister of Communications for the addition of these NADI locations. The State Government is confident that the implementation of NADI can become a catalyst for the local economy and at the same time accelerate digital transformation in Penang. Currently, three (3) NADI centres are operational in Penang, namely in the areas of Sungai Pinang, Sungai Pinang Barat Daya, not Sungai Pinang Daerah Timur Laut (DTL), Tasek Gelugor and Taman Prestij. Up to the third week of May 2024, 11 NADI centres have been completed in the State Constituencies of Permatang Pasir, Seberang Jaya, Perai, Bukit Tengah, Machang Bubuk, Berapit, Sungai Bakap, Pengkalan Kota, KOMTAR, Pulau Betong and Bertam. Meanwhile, 10 NADI centres are expected to be completed in the near future, involving the State Constituencies of Bagan Dalam, Bagan Jermal, Pinang Tunggal, Sungai Dua, Sungai Acheh, Air Putih, Air Itam, Bayan Lepas, Pulau Tikus and Batu Maung. The remaining 17 NADI locations are still undergoing premises renovation and awaiting approval from the parties involved. The State Government targets that the remaining NADI centres not yet operational can be completed by the end of June 2024. The State Government also plans to launch the first NADI Phase 2 in the State Constituency of KOMTAR in June this year, held at Taman Harapan, SP Chelliah. The hope and aspiration of the State Government is to make Penang an internationally standard smart state by 2030, in line with the Penang2030 vision. The State Government will continue to be committed to developing communication infrastructure that meets current technological needs and demands.
Yang Berhormat Yang di-Pertua Dewan Undangan Negeri, I would like to comment briefly on one of the State Government's strategic projects, namely the Bukit Bendera cable car project implemented through a public-private partnership (PPP). With a distance of 2.7km and a travel time of 10 minutes, this cable car will provide an alternative mode of transport to the top of Bukit Bendera, which will also reduce congestion in the existing Bukit Bendera Lower Station area in Air Itam. It will also become an iconic tourism product in our state. Because this project involves the sensitive area of Bukit Bendera, it was presented to the Meeting of the National Physical Planning Council (MPFN) on 11 December 2023, and the Council has endorsed and agreed to the proposal of this project, subject to compliance with the stipulated conditions and approval at the level of technical agencies, and taking into account the consideration and advice of MPFN. The Planning Permission application for the multi-storey vehicle park building was also approved conditionally at the OSC Meeting held on 12 December 2023, while the Planning Permission application for the lower station, middle station, upper station and cable car alignment components was approved conditionally on 29 January this year.
The SIA received approval on 27 November 2023 from PlanMalaysia@Pulau Pinang, and the Penang Hill Corporation together with the concessionaire and consultants held 18 Focus Group Discussions and a questionnaire survey, as well as several informal sessions, implemented from 16 August last year until 10 September last year, involving groups of stakeholders. The Traffic Impact Assessment (TIA) received conditional approval on 11 December 2023 from the Penang Island City Council (MBPP). Meanwhile, the Geotechnical Report received conditional approval letter on 11 January 2024 from the Penang State Public Works Department (JKRPP). The Environmental Impact Assessment (EIA) report received conditional approval on 16 January from the Department of Environment, and most recently, the Building Plan was approved on 24 April. So following the first-level approval from the technical agencies involved, the current measures or approaches are being finalised, namely the EMP or Environmental Management Plan, which covers the measures and monitoring methods to be taken during the construction period to ensure the project does not have a negative impact on the environment, has been submitted for approval by the Department of Environment on 20 May. Apart from that, the TMP or Traffic Management Plan is also being finalised by the consultant. This project has several components to be developed within a period of 20 months, expected to start in June or July 2024 and end at the end of 2025, and the construction timeline for the components is as stated earlier. Penang Hill Corporation is working hand in hand with the project concessionaire, Hartasuma Sdn. Bhd., to ensure the cable car project is implemented smoothly at all stages so that it can operate as a new tourism product in conjunction with Visit Malaysia Year 2026.
Dato' Speaker, the issue of traffic congestion. I think many Honourable Members have also raised this, because it is one of the issues faced in the state of Penang. Various initiatives have been implemented by agencies in planning and implementing infrastructure improvements to overcome this problem. In the speech of TYT Tun during the Opening Ceremony, TYT Tun raised the issue of traffic congestion in Sungai Dua and the North-South Expressway. This issue has also been debated by the Honourable Member for Sungai Dua, the Honourable Member for Bukit Tambun, Seberang Jaya and several other Honourable Members. The congestion from Sungai Dua to Juru and the surrounding areas in the north, central and south is not a new issue, and the State Government very much hopes this matter can be resolved urgently. As information for this august House, the Ministry of Works Malaysia (KKR) is now studying the proposal for a multi-level highway from Juru to Sungai Dua. KKR is now carrying out an Automatic Traffic Count work from the Juru Toll Plaza to the Sungai Dua Toll Plaza, which is expected to be completed at the end of this, what is it, expected to be completed this month, Honourable Member. A Special Task Force for the Study of Traffic Congestion from the Juru Toll Plaza to the Sungai Dua Toll Plaza and surrounding areas has been established, and a Technical Meeting was held on 20 May 2024. The traffic dispersal report and proposals will be prepared by KKR and are expected to be presented to the Ministry's top management and then to the Cabinet once completed.
Regarding the matter raised by the Honourable Member for Bukit Tambun about the issue on Jalan Bukit Tambun, as information for the Honourable Member, the Public Works Department (JKR) is carrying out land survey work to build a U-turn under the flyover, as well as utility mapping work for the purpose of utility relocation. The widening of the Federal Road from Bukit Tengah to Nibong Tebal has been raised to KKR under the Fifth Rolling Plan (RMK-12) through two (2) projects, namely first, the Upgrading Project of the Single Carriageway (FT001) from two lanes to a four-lane dual carriageway, from Permatang Tinggi (Section 740.4) to Sungai Juru (Section 746.4), Bukit Tengah, and also the Upgrading Project of the Federal Route (FT001) from the Permatang Keling Junction (Section 720) to the bridge over Sungai Junjung (Section 740), Simpang Ampat, SPS. Next, regarding the suggestion by the Honourable Member for Seberang Jaya that village roads and residential areas used as alternatives by users can be upgraded. As information for the Honourable Member, JKR has planned one (1) alternative road project to reduce congestion on the roads mentioned, namely the 100 Kaki Carrefour Road Construction Project which starts from the junction of Jalan Masjid Timah to Sungai Derhaka behind the AEON Big supermarket, previously called Carrefour. But because the project was made when it was still named Carrefour, the project title is still called Carrefour. This project is divided into two phases. Phase one starts from Jalan Masjid Timah to Sungai Derhaka, where JKR is now in the process of preparing design drawings and procurement documents. The project tender is expected to be advertised in December this year. For the second phase, its implementation will be considered after the phase one project is completed.
To respond to the request of the Honourable Member for Berapit that the widening project of Jalan Kampung Besar can be implemented while waiting for approval of allocation for the widening of Jalan Kulim from the Federal Government. As information for the Honourable Member, the project has been included in the list of projects under the Penang State Plan, and JKR has carried out a design study. However, the existing road land is within the Keretapi Tanah Melayu (KTM) Land Reserve and the land acquisition process needs to be carried out. The road upgrading work will be carried out when the land acquisition can be resolved. Regarding the traffic congestion in Pekan Tasek Gelugor caused by the housing projects of SP Setia and Scientex, as information for the Honourable Member for Permatang Berangan, the issue can be reduced by implementing the proposal for a one-way road from Pekan Tasek Gelugor to Pekan Sungai Dua. JKR has carried out a traffic study and is now in the process of appointing a consultant for the design study of the one-way road alignment. Next, the Honourable Member for KOMTAR raised the matter of setting speed limits on the Penang Bridge. As I answered in the written question, the speed limit on the highway alignment is actually determined based on the design and geometry of the road, with calculations by a qualified agency. Coordinating speed limits without considering road design will endanger the lives of road users. Therefore, the State Government urges all road users to comply with the speed limit signs. Dato' Speaker, Honourable Member for Telok Bahang...(interruption)
Honourable Member for Tanjong Bunga.
Sila, sila.
So the meaning is to keep part at 80, part at 70, because the written reply from the Honourable Member for Tanjong Bunga says that JKR or the Government will take 85%, and the Penang Bridge's design has a maximum capacity of 100 km per hour, so if 85 is the maximum, 80 is acceptable, can be considered. So now part is 80, part is 70. So if possible, we ask to harmonise the Penang Bridge, all at 80.
Kadang-kadang, ada lebuh raya yang di mana ada ataupun jalan yang di mana ada had-had yang lain di bahagian-bahagian yang lain. Dia sudah tentu ada disebabkan oleh reka bentuknya, Yang Berhormat. Jadi yang ni bukan sesuatu perkara yang kita boleh putuskan dalam Dewan ataupun Kerajaan Negeri yang putuskan. Saya rasa Yang Berhormat, perkara ini biar Jabatan Teknikal yang putuskan dan ada dia punya kebijaksanaan. Sekiranya kita tidak berpuas hati, mungkin kita boleh mengadakan perbincangan yang lanjut bersama Jabatan Teknikal, mungkin Yang Berhormat pun boleh join supaya kita boleh faham sebenarnya apakah isu-isu teknikal yang menyebabkan kenapa ada sebahagian jalan yang mempunyai had laju yang berlainan dan sebahagian jalan, lain. Mungkin di peringkat tu kita boleh bincang. Terima kasih Yang Berhormat yang prihatin. The Honourable Member for Telok Bahang rose regarding the condition of the broken and potholed road between Pondok Polis Sungai Pinang and Sekolah Kebangsaan (SK) Sungai Pinang. For the Honourable Member's information, maintenance works in the area have already been listed in the Periodic Pavement Maintenance Programme 2024. However, approval of the allocation has not yet been obtained, and if it is obtained, the works will be carried out.
In response to the Honourable Member for Penaga regarding the bridge at Pengkalan Bongor. For the Honourable Member's information, the contractor for the repair works to the damaged bridge railing has already been appointed, and the replacement works are currently being carried out and are expected to be completed at the end of July. As for the widening of the bridge, the application has already been submitted to the Ministry of Rural and Regional Development (KKDW) and is still awaiting approval.
Next, regarding the construction of the slip road at the Taman Sentri junction that does not follow the proposal in the Traffic Management Plan, the Honourable Member for Batu Uban is not here, I think. But to cut a long story short, amendments to the design had to be made because of utilities that were obstructing. In response to the question from the Honourable Member for Bukit Tambun regarding the status of land acquisition between Bandar Tasik Mutiara and Hijauan Hills, the missing link, since I became EXCO in 2018, every time the State Assembly sits, we hear about this missing link. I am pleased to inform the Honourable Member that, recently, we won a case in court in which the Penang High Court dismissed the application for Judicial Review. Two, two applications for Judicial Review by the developer Palmington Sdn. Bhd., and therefore the land acquisition process can continue and is indeed ongoing. But for the Honourable Member's information, Palmington has lodged an appeal once again, but because of the court, the High Court Judge has dismissed the Stay Order, what is it, the application for a stay, so the land acquisition works can be carried out. Therefore, in connection with that, the Land Administrator of SPS has issued Form E, Akta Pengambilan Tanah, namely a Notice of Inquiry against Palmington Sdn. Bhd. through a letter dated 14 May. Palmington has been informed and invited to attend the Land Acquisition Inquiry Session to be held on 5 June at the District and Land Office, South Seberang Perai.
With reference to the request of the Honourable Member for Seberang Jaya for clarification on the State Road Maintenance Allocation or the MARRIS allocation. For the Honourable Member's information, MARRIS allocations are channelled in phases by the State Finance Department (JKN) to the departments involved based on monthly receipts from the Federal Government through the Ministry of Finance (MOF). The departments involved are road-owning departments such as the Public Works Department (JKR), the Drainage and Irrigation Department (JPS), the Penang Island City Council (MBPP), the Seberang Perai City Council (MBSP), and the District and Land Offices. Therefore, the amount of MARRIS allocation channelled differs every year depending on the actual receipts from the MOF, and these receipts are based on the latest information in the MARRIS System that was updated by the State Government in the previous term. In 2018, I informed this august House that the MARRIS receipt for that year was only RM114 million. At that time, the State Government had already carried out a road survey project to update all state roads in Penang, and as a result the MARRIS allocation has now been doubled. For 2024, JKN projects receipts totalling RM240 million for MARRIS. We started with only RM100 million, 6 years ago.
Dato' Speaker, the State Government is very grateful for the commitment of the Federal Government to implement the Laluan Mutiara LRT Project. In response to the suggestion of the Honourable Member for Batu Uban, the State Government notes the Honourable Member's proposal regarding, he asked the Honourable Member to request an alignment through the Jalan Sungai Dua area, but for everyone's information, our existing alignment has a station at the Pesta site and another station at the USM main gate on Jalan Sultan Azlan Shah. The proposal of the Honourable Member for Sungai aaa..Batu Uban to enter Jalan Sungai Dua was discussed in the Alignment Finalisation Workshop held on 23 May, last week, and it was found that the proposal would pass through a very sharp turn (sharp turning radius), and the land acquisition in the surrounding area would also create a social impact. Therefore, we will retain the original alignment, which we found actually has a good balance and good ridership on both sides of the alignment. And in any case, we will ensure that when we implement this LRT, it will be together with a feeder bus system from Rapid Penang. So with the presence of the feeder bus service, it will act as a feeder to the LRT stations, and there will also be bus services at USM. The Honourable Member for Air Itam and also Berapit requested that future planning for the LRT be studied. On this, the State Government will certainly be involved in the study of future phase alignments, namely the Air Itam alignment, the Tanjong Bunga alignment, and also in Seberang Perai, but the time has not yet come, Honourable Member. We are all currently focusing on the implementation of the first alignment, namely Silicon Island to Penang Sentral, Butterworth.
In response to the statement of the Honourable Member for Machang Bubuk regarding the operating cost of the LRT and the views of NGOs. For the Honourable Member's information, in general, public transport projects are implemented and financed by the Federal Government. Therefore, development costs as well as operating costs are the responsibility of the Federal Government. The same applies to this Laluan Mutiara LRT. It actually has no cost to the State, to the State Government, nor in its operation later, because it is a 100 percent project of the Ministry of Transport. And the selection of the appropriate mode of transport will be decided in line with the projected passenger needs as well as development and operating costs that are proportionate to financial capacity, to ensure that the transport system built is sustainable in order to optimise infrastructure development costs. The Government will consider modular construction, taking into account current and future needs. This is important, Honourable Member, because when we choose the LRT system later, we want to choose a system that is scalable. That means not a system like, if we talk about LRT, this LRT is a light capacity system where for projected passengers at present, perhaps for 10 years it is sufficient, but perhaps in 20 years, 30 years, the capacity needs to be increased, and then we would need to build a new system. Honourable Member, Dato' Speaker. So we want to choose a system that is scalable, we can start perhaps with a lower frequency and with one or change the trains, so that when we want to add in the future we can put in three-car trains, four-car trains and so on. So the LRT system will be chosen, but also, Honourable Member, I know many people, when we discuss the LRT issue, imagine an LRT like the Kelana Jaya Line. But actually the system we are looking at for the State of Penang, Kelana Jaya, is a system that is actually medium-high capacity, 15,000 to 30,000 PPHPD, passengers per hour per direction. And this is a system that is not suitable for the State of Penang. It is too high capacity for the State of Penang, and we will not choose a system like the Kelana Jaya Line. The system we are exploring together with MRT Corp is a low-to-medium capacity system. Low-to-medium capacity, and this low-to-medium capacity system has many types. All of them fall under the LRT category. But under the LRT umbrella, there are many. There is LRT, actually part of the forms of LRT too, there is RRT, there is APM, AGT, LRV, tram, all of which are types of LRT, but which type will be chosen, that is for the Procurement Board in the ministry to decide, because it is a Federal project, but of course the selection will be based on passenger projections and also the needs of the State of Penang. In response to the question of the Honourable Member for Bagan Dalam regarding the sufficiency of electricity supply for the operation of the LRT. For the Honourable Member's information, the detailed design for the construction of the LRT certainly takes into account the use of sufficient electricity sources, where every few LRT stations will be interconnected with a Traction Power Sub Station that will supply electricity to the train system later. So it has certainly been taken into account, Honourable Member.
Honourable Member, Dato' Speaker, the airport issue, I have answered it in the oral question session. It is just that there is no need, I think, Honourable Member, to repeat it. The Honourable Member for Seri Delima also raised the issue of Package 2, most of which I have already answered in the oral session. The only new issue raised by the Honourable Member for Seri Delima concerns the excavator that slipped at Changkat Delima. Actually, that incident occurred during demobilisation, and it was moved again, lifted and placed onto a crane. So in fact it slipped from the trailer while being placed on top of the trailer, slipped, and was put back without any incident involving people or public property. Honourable Member, Dato' Speaker, regarding Silicon Island, the Honourable Member for Penanti asked about the appointment of consultants. For the Honourable Member's information, consultants are appointed by the project developer, namely Silicon Island Development Sdn. Bhd. (SIDSB), and SRS TC Sdn. Bhd., which is the contractor. However, it must be remembered that the State Government, as the project owner, is still involved in the process of appointing consultants through the involvement of Penang Infrastructure Corporation (PIC) in the shareholding of SID (Silicon Island Development) just now. The Chairman of the SID Board of Directors is also actually the Chief Executive Officer of PIC, namely YBhg. Dato' Seri Farizan.
Next, the Honourable Member for Penanti also raised the matter of local expertise and foreign experts in the field of geotechnical engineering. For the Honourable Member's information, reclamation projects are a method that is not unfamiliar in the State of Malaysia, the country of Malaysia. Local consultants have sufficient experience and expertise in geotechnical engineering to carry out works and studies related to reclamation projects. Geotechnical engineering is also a field that requires local expertise, namely consultants who are well versed in the condition of the soil in a certain place or state. Therefore, the knowledge and experience possessed by local consultants are more relevant for reclamation projects in our homeland compared with expertise from overseas. Regarding the allegation of the Honourable Member for Sungai Dua concerning the mud incident at Pengkalan Sungai Batu. I wish to inform this august House that the southern area of Penang is actually a shallow and muddy intertidal or tidal area and has been so since long ago. During the preparation of the EIA report, certified consultants identified this condition. And during the implementation of the project, the State Government carried out periodic monitoring including coastline monitoring and water quality monitoring. Based on the coastline monitoring reports carried out every three months, there were no
findings showing any increase in sedimentation in the areas around the Silicon Island project, including the Sungai Batu area. This report was submitted to JPS and its findings were also verified. In addition, water quality monitoring is also carried out every month. Monitoring of water quality (total suspended solids) carried out since September 2023 shows readings that do not exceed the permitted level at the monitoring stations, especially in the Sungai Batu area. So there is no problem, Honourable Member. There is also an allegation that marine resources have decreased as a result of the Silicon Island project. The State Government wishes to refer to the statement by LKIM on 22 March 2024, in which the Chairman of LKIM said there was no scientific finding showing that fish catches in Penang were affected by this reclamation project. According to him, data collected from LKIM fish landing centres in Penang in the months before and also after the start of reclamation works show that shrimp catches are in an upward and downward pattern. This pattern was also recorded at the LKIM Teluk Kumbar Fish Landing Centre, which is the main centre for fishermen in Sungai Batu. This pattern was significant in early September and October when reclamation works had just begun. At that time, shrimp catches had increased significantly, reaching 3.4 metric tonnes and 4.7 metric tonnes respectively. In December, shrimp catches remained high at more than 4.0 metric tonnes. Based on the LKIM findings, we cannot conclude that the Silicon Island reclamation has an effect on fishing activity in the surrounding area.
However, the State Government remains sensitive to the concerns of fishermen regarding their livelihoods. Therefore, the Social Impact Management Plan (SIMP) scheme has already been implemented to help fishermen improve their fishing operations. For example, registered fishermen receiving SIMP from Permatang Tepi Laut, Sungai Batu, Gertak Sanggul and Teluk Kumbar have received new boats of a larger size, namely 27 feet, and more powerful engines of 90-100HP so that they can go further to catch fish. From this aspect, their activities have not only not been affected but have become even better. The State Government also believes that we all realise that the issue of depleted marine resources is an international phenomenon that occurs due to overfishing, climate change and also various other factors. Therefore, the State Government strongly encourages more sustainable fishing activities such as cage fish farming that can be undertaken by fishing communities. The State Government is confident that cage fish farming will bring many benefits to fishing communities and contribute to the modernisation of the fisheries sector and food security in Penang. Dato' Speaker, regarding the issue of electricity supply. The issue of power factor surcharge as raised by the Honourable Member for Batu Lancang. This is a little technical, and I will try to explain. For the Honourable Member's information, Power Factor is an index used to measure the level of efficiency in electricity use. So it actually revolves around the issue of energy efficiency (efficiency of energy). This index is measured on a range from 0 to 1. Customers of Tenaga Nasional Berhad (TNB) from the Commercial, Industrial, Mining and Agricultural categories who take three-phase electricity supply are encouraged to consistently maintain a high Power Factor index, namely above 0.85 or
0.90. A high Power Factor index shows a level of efficient electricity use. This means that if the Power Factor is 0.85 and above, it means it is efficient. If it is below 0.85, it means it is not efficient. Conversely, a low Power Factor index shows inefficient electricity use or electricity wastage. Inefficient use of electrical energy can contribute to higher carbon emissions or carbon footprint, which in turn increases global warming. A Power Factor surcharge will be imposed if the Power Factor Index is recorded below 0.85. This applies to consumers who take electricity supply at 33 kV, and for consumers who take electricity supply at 132kV and above, the index used is 0.90. The increase in the electricity bill due to the power factor surcharge depends on the difference in the power factor range recorded compared with the minimum standard of 0.85 or 0.9, depending on what I mentioned just now, and the calculation of the power factor surcharge is as follows: for a power factor index of 0.85 to 0.75, the surcharge is 1.5% for every 0.01 point; for a power factor index of less than 0.75, the surcharge is 3 percent.
Among the measures suggested to improve the power factor index so that it remains within the range required to avoid a power factor surcharge are as follows: first, installing capacitors; second, avoiding operating electrical equipment without load or under the recommended load; third, using motor-based electrical equipment that has a high power factor index; and fourth, using electrical equipment certified by SIRIM and bearing the energy-efficient label. Next, regarding the issue of consumers experiencing increased charges after the installation of smart meters. For the Honourable Member's information, TNB guarantees that the increase in electricity bills is not caused by the installation of smart meters; any changes to the electricity bill are due to factors of inaccuracy of old meters and changes in usage patterns. Old meters may not function efficiently because some meter components have worn out or some meters have been tampered with. In addition, changes in weather may also cause an increase or decrease in electricity usage, with more frequent use of motorised electrical appliances such as air conditioners, refrigerators, heaters, washing machines and so on. Smart meters only measure the total energy used every half hour and record meter readings remotely. Consumers can view this information through the myTNB portal to help them track and manage energy use more wisely. Smart meter users can also set a monthly budget limit for their usage. This also helps to control, to regulate our electricity use.
Also, for the Honourable Member's information, smart meters do not have the capability to see, hear or spy on consumers. Smart meters comply with the Personal Data Protection Act (PDPA) and are also safe and approved by SIRIM and also MCMC. The Honourable Member for Batu Lancang also mentioned the increase in electricity tariffs that burdens end users. For the Honourable Member's information, the power factor surcharge that I mentioned just now is only imposed on commercial and industrial consumers and not on domestic consumers, but starting 1 March 2024, an 8% service tax was imposed on domestic tariff A customers, namely those whose electricity usage exceeds 600kWj, or in terms of ringgit, 231.80 sen. If the bill is more than RM231.00 ringgit, an 8% service tax will be imposed, and the billing period is 28 days or more. For the Honourable Member's information, before 1 March 2024, domestic consumers whose electricity usage exceeded 600kWj were subject to a service tax at only 6%, so what has increased is the service tax from 6% to 8%. So the State Government certainly urges all customers to always practise efficient and prudent electricity use in order to avoid wastage and to avoid being subject to the service tax, so if we use less than RM230 we can save a little. Honourable Member.
Okay, the Honourable Member for Permatang Berangan rose on the issue of electricity supply in rural areas. In fact, Honourable Member, if there are applications that are rejected because of supply, TNB wishes to ensure quality electricity supply. But if there are urgent applications, they can be submitted to TNB after the system upgrade has been carried out. But if it is very urgent, the applicant may also hand over a substation site to allow TNB to channel a higher quality supply. The substation site is very much needed by TNB to ensure that existing consumers do not suffer excessive load or overload and voltage drop when new consumers are connected to the existing electricity supply system. The need for electrical substations is based on the planning of the existing load system, and additional load will become a problem and must be resolved, as I mentioned just now, through system upgrading in the area. Dato' Speaker…(interruption).
Mohon pencelahan
Tanjong Bunga, do you have many more questions if…(interruption).
After this, the issue is water, but most of it has already been discussed during the oral question session, Honourable Speaker.
Thank you to Tanjong Bungah, regarding the rural electricity supply that I raised in yesterday's debate. New applications cannot be processed because, it is understood from TNB, there is not enough supply, and the existing supply is also insufficient, and TNB needs substation sites, yes, it needs substation sites. But the problem is obtaining substation sites. If we want to burden consumers to provide substation sites, it is really unfair, it really is not…
House Suspended
there is no site at all, so what we need to do is a study, or work together with TNB to think about how we can provide these substation sites so that TNB can build new substations and supply energy to the new consumers applying. And one more matter, regarding the traffic congestion from Tasek Gelugor to Sungai Dua just now, Honourable Member has already answered earlier, and a study is being carried out only in Sungai Dua town. In Sungai Dua town, it is proposed to make one-way roads as in Penanti town to avoid congestion in Sungai Dua town. But what I raised in my debate speech yesterday was our concern about the congestion that will occur between Tasek Gelugor and Sungai Dua when the Setia Fontaines housing estate and Scientex are fully opened, where vehicles are expected to increase greatly, and this congestion will worsen when these housing projects are completed and opened. So I ask the State Government to carry out a study to create an alternative route or road widening. Thank you.
Thank you, Honourable Member. I need to examine this matter more thoroughly with MBSP and also JKR, but as far as I know, when there are big projects such as Setia Fontaines and so on, usually a traffic impact assessment will be carried out, and then upgrading conditions will be imposed on the developer. So we can check for this project, for the road that the Honourable Member mentioned just now, whether that upgrading is required, and if it is or is not, we can take further action. Later I will take note from the Honourable Member about this matter. As for the issue of insufficient supply, Honourable Member, perhaps for this case, many people are facing this problem? This matter needs further discussion with TNB; I will obtain the information.
YB, I allow that little bit to be brought forward to tomorrow. I think three minutes is not enough for the Honourable Member to make a winding-up on the water issue even though much has been said, but with permission, I ask YB to be brief tomorrow as many explanations have already been delivered in this House. Okay, Honourable Members, for today we need to adjourn here, and Honourable Members, we will continue tomorrow at 9.30, yes.
The House was adjourned at 5.13 p.m.