Pulau Pinang · 14 November 2025
15th Assembly, 3rd session, 2nd meeting (Budget 2026) · 155 turns · 19,964 words · official PDF ↗
ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.
(Opening)
Honourable Members, Yang Berhormat Speaker of the State Legislative Assembly. Honourable Members, the prayer will now be read. Prayer. Announcement by the Yang Berhormat Speaker of the State Legislative Assembly.
Thank you. Honourable Members, good morning and greetings of peace. The Yang Terutama Yang di-Pertua Negeri has already fixed today, 14 November 2025, as the first day of the Second Meeting of the Third Session of the Fifteenth State Legislative Assembly, through a proclamation that was already gazetted on 2 October 2025.
Honourable Members, be informed that the late Tuan Gooi Hock Lye passed away on 16 September 2025. He served as a Member of the State Legislative Assembly for the constituency of Machang Bubuk for two terms, from 1986 until 1995, and Allahyarham Dato' Abdul Rahman bin Abdul Kadir passed away on 8 November 2025. He served as a Member of the State Legislative Assembly for the constituency of Penanti for one term, from 1999 until 2004. Therefore, my dear guests, I ask you to observe a moment of silence for one minute. Guests are requested to stand (the House observes a moment of silence). Guests, please be seated. Thank you.
Honourable Members, before we proceed with the business of the meeting for today, this august House extends a Welcome to Yang Berusaha Tuan Mohamed bin Abdul Rahman, Deputy State Secretary for the Development Division, and Yang Berusaha Tuan Muhamad Ghopran bin Yeop Hamzah, Deputy State Secretary for the State Management Division of Penang, who have already begun their duties on 3 June 2025.
Honourable Members, for this sitting, the time allocated for each Honourable Member's debate session is not more than 25 minutes, as usual. Honourable Members are requested to arrange their debate agendas so that they can run smoothly and perfectly. The Leader of the Opposition is exempted.
It is also reminded that all debate agendas should focus on the Development Estimates Motion for the Year 2026 which will later be tabled by the Yang Amat Berhormat Chief Minister. Honourable Members, and for this occasion the House will sit continuously without a break. Therefore, Honourable Members are requested to manage their own time, including meal and prayer times, as appropriate, as usual.
Honourable Members, for this session, we will consider a total of 73 oral questions, 73 oral questions, 766 written questions, 766 written questions, Two Bills and Three Motions. The Meeting will sit until all business of the meeting is completed.
Pembentangan Risalah.
Sila.
Thank you, Dato' Seri Speaker. I respectfully request to table on the Table of the House, Paper Numbers Four to Fifteen of 2025 as listed in the order of business of the meeting.
Thank you. We must not forget to wish a Happy Birthday to the Right Honourable Chief Minister.
Questions. Written Questions.
Debate on Oral QuestionsQuestions
Yang Berhormat Dato' Seri Speaker of the House, the answers to the written questions have been placed on the table of the Members who asked them in accordance with Sub-Rule 15(1)(h), Rules of the Penang State Legislative Assembly Meeting Rules, and will be included in the Official Report.
Terima kasih.
Soalan Lisan.
Honourable Members, we now move on to the oral question session. I now invite Machang Bubuk.
Thank you, Dato' Seri Speaker. My question is question number 1.
No.1 Soft power Seberang Perai.
(a) Explain the state government's achievements in increasing public awareness of history, culture and soft power;
(b) State the specific initiatives implemented together with Think City and the local community;
(c) How does Penang leverage historical figures, arts communities, diaspora and Institutions of Higher Learning as the state's cultural ambassadors?
Sila.
Thank you, Dato' Seri Speaker. Thank you to the question from the Member for Machang Bubuk, who asked about Soft Power for Seberang Perai.
The Penang State Government, through Penang Global Tourism, the Seberang Perai Municipal Council and the State Heritage Commissioner's Office, has implemented various strategic initiatives to increase public awareness of the state's history, culture and soft power strengths, in collaboration with Think City as well as public higher education institutions and various agencies.
Among the main initiatives are the publication of new promotional materials by Think City in collaboration with the State Government that were launched, such as the Book of History and Heritage of Haji in Seberang Perai. A tourism guide to Guar Kepah, the Permatang Tinggi Cultural Enclave, and Tourism Brochures for the districts of North, Central and South Seberang Perai. Seven promotional videos titled "Small Town of Seberang Perai," the result of Think City's initiative that introduced the history of communities and local cultural identity at the international level, were also produced.
MBSP has continued to strengthen strategic cooperation with Think City and the local community in efforts to upgrade the image of the Seberang Perai Town through the Place Making approach and community-based development to beautify the town, enrich public spaces and improve the quality of life of residents.
Among the main projects are the Seberang Perai Town Grant Programme 2024 to 2025, which supports socio-economic development and revitalises small towns in Seberang Perai. One example of Place Making success is the Butterworth Art Walk Project, an effort to revive an old lane with public art elements such as murals, sculptures and creative installations that highlight the history and identity of the Seberang Perai community.
In addition, the Beach Park Upgrading Project was also implemented to beautify the public recreational area with landscape art elements, walkways, community spaces and lighting that function as centres of social interaction and community tourism attractions. MBSP also implemented the Migratory Bird Information Board Project at Sungai Tembus, the Bird Flyway Project, in collaboration with the Sungai Tembus Fishermen's Association to increase public awareness of the diversity of migratory bird species and support nature-based tourism.
In addition, the Integrated Community Hub at the Lebuh Kampung Benggali Precinct, which houses the Butterworth Digital Library, a Pocket Park and a Public Swimming Pool, was also established as a social space for the community. Through the Seberang Perai Small Town Grants Programme, local residents were also given the opportunity to implement Community Tourism Projects based on heritage and culture to empower local premises. The State Government also collaborates with universities in this matter. The State Government collaborates with USM to produce a historical study and Haji Heritage in Seberang Perai. UPSI and USM are also involved in the Bird Flyway Project at Sungai Tembus, while UPM implements the Fun Map Seberang Perai Eco and Heritage, which introduces historical sites and eco-tourism interactively.
Research outputs such as the Seberang Perai History Book are also used as reference materials at MBSP and UiTM. At the same time, local arts communities play a role as cultural ambassadors of Penang through active participation in Arts and Cultural Festivals such as the Butterworth Fringe Festival, the Nibong Tebal Festival, as well as Pesta Penang2030 and Seberang Perai Heritage Day. That is my answer. Thank you.
Terima kasih.
Thank you, Dato' Seri Speaker and also Paya Terubong. My supplementary question is that we also know that soft power or cultural history is a very important creative economy, an element of the creative economy. So, I also would like to know, apart from the programmes that we have been working together with Think City, what comprehensive strategy there is in terms of how we can develop the creative economy in the State of Penang, especially in fields such as film, a field that grows from the art of music. How can we learn from, for example, South Korea. We can make Seberang Perai a place for people to shoot films or there are talents that we can showcase in this State of Penang. That is all my question. Thank you.
Thank you for that question. The State Government is concerned about the development of the creative economy in Seberang Perai, and we, together with several agencies, have launched the new Nordin Ahmad Gallery recently at Permatang Pasir, which is a tribute to an important arts figure. Likewise, with various activities such as boria, which is indeed active in Seberang Perai, among them figures like Boria Omara who have been honoured, and I think there is still great opportunity because through the seven short films I mentioned earlier, among other things, silat has been highlighted. How the art of silat is active in Seberang Perai, and when short films of one or two minutes are uploaded on the internet, they will gain worldwide attention. How the strength of diversity of arts, from martial arts, singing and so on, can gain attention. Because in the world of the internet and social media, I think the opportunity is very great, and we must use this opportunity. The State Government, together with the agencies I mentioned earlier, will continue to work with artists to further boost the development of the creative economy in Seberang Perai.
Thank you. Invite Telok Bahang.
Thank you, Dato' Seri Speaker. My question is question number two.
No.2 As of today, how many areas or villages have been gazetted as heritage villages or heritage zones in this state?
Terima kasih.
Thank you for the question from the State Assemblyman for Telok Bahang regarding Heritage Villages. The Old Malay Village of Air Itam has been nominated as a Heritage Site under the National Heritage Act 2005 (Act 645). The nomination is currently in the process of obtaining approval from the owners and the State Authority before further action is taken by the National Heritage Department for the purpose of official gazettement. This step reflects the State Government's continued commitment to preserving and protecting historic heritage sites and traditional villages as part of Penang's cultural and historical identity. That is my answer.
Thank you. Please.
Supplementary question, Dato' Seri. What are the criteria used to make an area, zone or village, apart from relics or those that have existed for a long time, to be registered as a Heritage Zone. And secondly, what are the benefits when an area is registered as a Heritage Zone. Thank you.
Thank you for the question just now. Apart from historical relics, historical relics are very important because the place must have a new history that can be recognised as heritage. But what is even more important is that the area must be inhabited. That means there are still residents, there are still residents carrying out social, artistic and community activities, it is not an empty place. But therefore, for the Old Malay Village of Air Itam, we have made a nomination because the Tomb of Sheikh Omar there has high historical value and is one of the sources of the spread of Islam in Penang, and Sheikh Omar was the first Mufti of Penang. And I think, apart from that, it must have universal value with its history, its inhabitants, its community activities and so on. And subject to the National Heritage Department, the National Heritage Department has set criteria specifying several elements that I mentioned earlier before they can approve it as a Heritage Site. It must meet the characteristics of history with the history of that community, and anyone who wishes to make a nomination must fill in a nomination form and must fill in the form with the important information I mentioned earlier before it can be considered as a Heritage Site by the National Heritage Department at Federal level. That is my answer.
Terima kasih.
Soalan tambahan.
Sila.
Honourable Member, may we know how many Heritage Villages there are today?
What I mentioned earlier are the names that we have nominated. If there are villages that have not yet been nominated, which have potential, anyone or any association can actually make a nomination, and it is subject to the National Heritage Department to approve it. And just now Telok Bahang asked about the benefits. Let me add a little on the benefits, because when a place is declared as a Heritage Site, it will certainly be publicised to the public, and it will be announced nationally or internationally to the public and will become a new tourist attraction. And apart from that, a Heritage Site at national level has a certain financial allocation, if there is a certain financial allocation, for refurbishment or upgrading of the Heritage Site, because it already has an important status, and that is the benefit I mentioned earlier. Thank you for that question.
Penanti asks for the list. Oh, just this one, thank you. I would like to request Bukit Tengah, please.
Thank you, Dato' Seri Speaker, my question is question number three.
No.3 Explain the detailed plan of the State Government to establish an international financial centre in Penang that has been proposed to the Federal Government, and how this plan is important as a new economic catalyst for Penang.
Terima kasih.
Yang Berhormat Dato' Seri Speaker, I respectfully request to answer Question 3 from Yang Berhormat Bukit Tengah together with Question 69 from Yang Berhormat Air Putih regarding the Penang International Financial Centre.
No.69 State the reasons why the State Government's application for a Penang Special Financial Zone within the island area was not approved.
(a) Is the selection of a site in Ampang Jajar within the Bagan Parliamentary constituency more suitable to ensure balanced development between the island and Seberang Perai areas?
Boleh, sila.
Thank you for the question regarding the Penang International Financial Centre (PIFC) proposed by the State Government. To answer the question:
(a) On the concept and mechanism for establishing the PIFC, it is a strategic initiative of the Penang State Government to strengthen the state's financial ecosystem and drive economic growth based on knowledge and high technology. The three main pillars of the PIFC are first, the State Industrial Investment Fund or State Sovereign Wealth Fund, which uses state assets such as land to generate investment capital without requiring direct approval from the Federal Government. Second, property digitalisation, which converts state-owned land assets into Real Estate Investment Trusts (REITs) to attract private investors. And third, the fiscal development of a financial hub, creating a Special Zone with modern infrastructure and a digital business ecosystem supported by a Fintech Data Centre and professional support services.
(b) The status of the application and the response of the Federal Government. In accordance with the provisions of the Federal Constitution, approval from the Federal Government is required if the proposal to establish the PIFC involves foreign funds or investment by international companies that are subject to the National Financial Policy. The State Government has submitted an application to the Ministry of Finance Malaysia (MOF) to establish the Penang Special Financial Zone. The application has not involved any cost to the State Government so far. However, the MOF has informed that there is currently no policy plan to establish an International Financial Centre. The MOF also explained
that the State Government's proposal to set up a Working Group, consisting of representatives of the Penang State Government, the MOF, Bank Negara Malaysia and related agencies, is not supported as the ministry concerned does not yet have any specific policy on the establishment of an International Financial Centre in Malaysia.
(c) Location and proposed site. Determining the location of the PIFC requires comprehensive consideration and further discussion with stakeholders, particularly involving legal, financial and industry requirement implications. By comparison, major international financial centres abroad take up to seven years before they can be fully operational. Therefore, the process of selecting a location for the PIFC will be carried out carefully, in phases and based on suitability analysis and current market needs. The proposal to establish the PIFC in Ampang Jajar, covering approximately 40 hectares, is greatly appreciated and will be considered together with other locations that have also been identified as having potential in line with the state's development planning, to ensure continuity of growth between the Island and Seberang Perai areas.
(d) Justification and economic benefits to the state. The establishment of the PIFC is projected to become a new economic catalyst for Penang and will focus on the integration between the semiconductor industry and the digital financial sector. This initiative is seen as a strategic step to strengthen Penang's position as a high-technology and competitive economic hub in the region. Among the main economic benefits expected from the implementation of the PIFC is the upgrading of the industrial value chain, or upgrading the value chain. Financing of high-value activities through the PIFC has the potential to attract venture capital and private equity to support research and development (R&D) activities, integrated circuit design and the specialisation of engineering services. This approach is in line with the aspirations of the National Semiconductor Strategy to bring Malaysia's industry to higher levels of the value chain. Secondly, attracting and retaining high-quality capital and talent. The International Financial Centre is able to provide the infrastructure, institutions and investment ecosystem needed to attract large-scale international funds. The existence of the PIFC not only supports the high-technology manufacturing sector
but also strengthens professional support services, while creating highly skilled job opportunities for local people and reducing the problem of talent migration or brain drain. Thirdly, pioneering digital financial innovation. The PIFC is expected to function as a regional digital finance platform that differentiates Penang from other International Financial Centres by focusing on financial technology (Fintech) and data-based industry integration, automation and AI. Fourthly, employment opportunities and local economic empowerment. The development of the PIFC will generate various new job opportunities in the financial, ICT, engineering and technical services sectors. Directly, it will strengthen local economic activity through the development of modern infrastructure, a comprehensive digital ecosystem and the improvement of the people's standard of living.
(e) Action plan and direction. Although this original proposal is not currently supported by the MOF, the State Government has not stopped the effort. Through the Penang Institute, a feasibility study is being carried out to detail the economic model and the potential of the PIFC as a regional digital finance hub. Follow-up steps include continuing engagement with financial agencies, investors and strategic property developers. Establishing initiatives in Fintech and Digital Finance that do not overlap with existing financial centres, and restructuring the strategy for implementing the PIFC in phases and on a self-reliant basis with the support of state funds and private sector collaboration.
Overall, the summary of the PIFC is the long-term aspiration of the Penang State Government to make the state a centre of digital finance and new technology that supports a high-income economy. Although it has not yet received policy approval at the Federal level, this initiative will continue to be refined through a phased approach of digital financial innovation development and public-private strategic partnership, so that Penang remains a leader in the country's modern economic development. Thank you.
Terima kasih.
Thank you to the Honourable Chief Minister for a very detailed answer to this question. The answer sorry, as has already been informed by the Honourable Chief Minister, this PIFC plan is very important for the future growth of the State of Penang. Its very important for our future in terms of diversifying our state economy, and as already informed by the Chief Minister, it will also be in line with the Master Plan Malaysia and will strengthen the Global Financial Centre Malaysia initiative that has already been implemented by the Federal Government. However, we all, I can say that I am quite disappointed that the Federal Government has already rejected the proposal to establish this financial centre at such an early stage, and from the reasons given earlier by the Chief Minister, the Federal Government's answer also seems rather unconvincing to me. So my question is specifically what follow-up action the State Government will take, even though the Honourable Government has already informed this honourable House that we will continue to pursue this project, but how will we convince the Federal Government so that we can proceed with this project. Thank you, Honourable.
Thank you, Dato' Seri Speaker, and thank you to the Honourable Member for Bukit Tengah for the supplementary question. I am not disappointed because we have only started this initiative at the pre-initial or initial stage, where only through a letter to the Prime Minister and possibly forwarded to the Treasury to take note of the State Government's initiative regarding this PIFC, and although the answer states that there is currently no policy plan. It is rather surprising that an initiative of this scale would be approved with just a letter. This should be a fairly lengthy process. Imagine if our LRT project took nearly 10 years of effort before it could convince the Federal Government, especially the Prime Minister, not just to approve it, but to take into account the importance of Seberang Perai by extending the Mutiara LRT from Penang to Seberang Perai. That is the result, even though we did not want to take note either. Give us some too, come on. (House laughs).
So I believe this proposal still has a lot of room, I have indeed not yet had the opportunity to engage with the Honourable Prime Minister on this matter, and at the State of Penang level too, what we can do still has a lot of room for improvement and strengthening, and the Penang Institute is still continuing this initiative. Recently, after the meeting that was held, we have asked the Penang Institute to ask three companies that responded to our expression of interest. We have carried out an expression of interest exercise so that they inform the State Government how these private companies can assist and become strategic partners to obtain approval, including from the Federal Government, and how they can attract financial support to help private companies in the State of Penang to implement the PIFC together with the State Government. We have asked these three companies to refine the initial proposal and deepen what was presented earlier, so that the State Government together with the Penang Institute can examine it better before this matter is raised again with the Federal Government. That is all, thank you.
Terima kasih.
Soalan tambahan.
KOMTAR dulu.
Thank you, because we have a positive Chief Minister. So, but I want to ask whether the Chief Minister has studied how Johor obtained the status of a finacial centre in a time considered rather short too. So, that may be one way for Penang to learn how to obtain that status, lah.
I hope the Prime Minister can also hear the views of the Honourable Member for KOMTAR, because there are things that Penang has, many kinds of char kue tiau and Laksa, Johor does not have, but there is something Johor has, we do not have. (House laughs).
Terima kasih.
Air Putih, please.
Thank you, Dato' Speaker. I want to thank the Honourable Chief Minister for the answer given, where the Seberang Perai area is also taken into account as one of the options for the Special Financial Zone or this PIFC. And indeed this is in line with the State Government's efforts to make Seberang Perai the future economic catalyst of the State of Penang. And here can priority be given, because if we look at Seberang Perai, this Ampang Jajar area involves two parliamentary constituencies. It is apart from the Bagan Parliamentary constituency and also the Permatang Pauh constituency. And I believe the opposition will also support the efforts made by the Honourable Chief Minister so that it can generate more income for the people of the State of Penang. Can this proposal also get blessing, because the Prime Minister is also a son of the State of Penang. But from all residents, so that all levels of Penang society. Thank you.
Thank you to the Honourable Member for Air Putih, under the leadership of the Honourable Prime Minister everything is possible, especially with regard to Penang and Seberang Perai. The Honourable Member for Bagan strongly supports it if Seberang Perai, especially Bagan, receives the benefit, but we do not know whether the Honourable Member for Permatang Pauh wants it or does not want it. (House laughs). But whether we like it or not, if it is suitable we will also give it, if suitable. But at this stage, according to what has been proposed by the three companies, they have their own considerations for choosing certain areas. But the stance of the State Government at this time is that we have not yet studied many matters, including its location.
Therefore there is room to explore, not in just one place, perhaps it can be held simultaneously in several locations that may offer specific services at location A, location B, location C and so on. So this is still at the initial stage, I am not sure, even though today is my birthday, if I make a wish, it cannot be granted today. So this is an effort that will be continued and I hope it will also succeed, thank you.
Terima kasih.
YB.
PIFC. Sila.
Good morning and greetings of peace.
Prospective Parliamentary candidate for Tasek Gelugor. Please.
Good morning, Dato' Speaker and Chief Minister. What was asked earlier by the three (3) companies to build the LRT, all that, this matter. Whether this matter will materialise or not, which we have always seen, for example, we have seen it being hyped up like the tunnel that has not materialised until today. Will this matter happen (Interruption). Honourable Member.
It is not relevant to the main question. (Interruption). But I will answer anyway.
Even if you do not want to listen, I will still answer. (House laughs). The State Government, in my specific case, has never stated that the tunnel project is not proceeding, we still state that it will proceed, but we have other focuses. Meanwhile, work is still ongoing. In the latest Executive Council (MMK) meeting last Wednesday, we still received presentations from related companies to see how to address issues related to the construction of this project because it involves the enlargement of the Penang Port. If a bridge is built as a replacement, what would be the height of the bridge, considering that Butterworth Airport is also very close. These are all technical issues that are still under refinement. Moreover, according to the master agreement, the study work has not yet been completed, they still need to continue until all parties are satisfied with the design, the proposed alignment, the financial arrangement and so on. Although this is something that is constantly said, at the Penang State level this is an active project and not an abandoned project or one that has been stopped, no. So I think the PIFC is the same. This is only at the initial stage. Earlier, the Honourable Member for KOMTAR said it would be good to have an optimistic, positive Chief Minister. Optimistic, positive, I invite the Honourable Member for Telok Air Tawar to join me on a more positive journey (House laughs) so that Telok Air Tawar, Tasek Gelugor and the entire State of Penang will experience a positive change and transformation for our children.
Thank you. Okay, thank you. I just want to inform that there is a slight correction because I made a mistake earlier, namely that I stated that the late Tuan Goik Hock Lai passed away on 16 September 2025, which is an error. The correct date is that the late passed away on 19 June, 19 June 2025, please correct the Hansard. And I apologise, and I want to invite the next question, Bukit Tambun.
Thank you, Dato' Seri Speaker. My question is question number four (interruption), yes.
No.4 Describe the preparations for the Penang Bridge International Marathon (PBIM) 2025.
(a) Describe the organisation of the PBIM 2024, which was held for the first time in Batu Kawan. (b) What is the impact of the organisation of the PBIM 2024 on sports tourism in Seberang Perai? (c) Describe the development of the sports tourism ecosystem in Penang as well as the promotion programmes that have been and will be implemented.
Thank you, Bukit Tambun. The Penang Bridge International Marathon 2025 is scheduled for 14 December 2025 and will start from Aspen Vision City in Batu Kawan and run across the Second Penang Bridge. Various preparations and improvements are being planned, including strengthening sponsorship, organising satellite activities and community festivals, and introducing racecation packages that combine running and tourism activities. Focus is also given to improving public facilities, traffic control and the participant experience, so that PBIM remains an internationally standard running event and a sports tourism icon of Penang. A total of 22,609 participants have registered. For the Full Marathon category, 4,287 people; for the Half Marathon, 10,237 runners; and for the 10km, 8,085 people. For PBIM 2024, the event was organised in Batu Kawan for the first time, with a new route across the Sultan Abdul Halim Muadzam Shah Bridge, namely the Second Penang Bridge.
The choice of this location offers the advantage of a wider start and finish area and more efficient logistics facilities. The 2024 event recorded participation of more than 22,000 participants from over 60 countries, making it the largest running event in the north of the Peninsula. In terms of organisation, PBIM 2024 was implemented by my office in collaboration with a subsidiary of the State Government, Penang Convention & Exhibition Bureau, as well as strategic partners such as Aspen-Klippa and several main sponsors. Various pre-event activities were also carried out.
Overall, the new location in Batu Kawan offers a more comfortable experience for participants through easy access, open spaces and well-organised facilities. The organisation of PBIM has had a significant economic and social impact on the Seberang Perai area, particularly around Batu Kawan. The presence of thousands of runners and companions has increased hotel occupancy rates, food spending and local economic activities. From a tourism perspective, PBIM has succeeded in branding Batu Kawan as a new destination for international sports tourism events, while at the same time balancing the tourism focus between the Island and Seberang Perai.
This event has also invigorated the sports tourism economic chain. Following the organisation of PBIM 2024 at Aspen Vision City in Batu Kawan, I am pleased to report that there were 8 running events in that area, namely after the 2024 organisation, the place has been elevated as a new running event destination. Among the 8 runs that have been held are the Milo Breakfast Run, Jabil Run, Leader Land I'm The Leader Run, Rotary Darkness into Light Run, Civil Servants' Grand Assembly Run, Jersey Ipal Run, Shell 5 Kilometre Casual Run, and the BMW Tian Siang Run. The State Government, through my office, will continue to strengthen the sports tourism ecosystem economy in line with the Penang2030 Aspiration, making PBIM a main event in the state's sports and tourism calendar, and that is my answer.
Thank you for the very comprehensive answer from Paya Terubong. My question is that the Penang Bridge Marathon has been held since 1986, and to my knowledge and observation, the Penang Bridge Marathon is the only marathon event organised by the Government. I see that in any marathon organisation, the party is private, but this one has been organised by the Penang State Government since 1986, and especially since the transfer of power under PETACH. Has the Penang Bridge Marathon, throughout its organisation, brought results or returns to the State Government? If not, what initiatives will the Honourable Member take to generate income for the State Government, considering that participants have reached 22,000 and Marathon participants number 4,287? That is my first question. My second question is whether the State Government intends to promote the Sport Tourism Event in combination with Batu Kawan and the Second Penang Bridge, and what are the challenges?. Thank you.
Thank you for the question. For example, the participation fee for an international marathon such as the Tokyo Marathon is USD250. That means roughly RM1,000, and we only charge a little over RM100 for the Penang Bridge International Marathon. So we also give a Finisher t-shirt; at the Tokyo Marathon, you have to buy the Finisher t-shirt yourself. And I think we have not, we have not collaborated with the private sector, with sponsors, to cover the expenses, and if there is no additional income to the State Government, we have maintained the participation fee for these 2 years so that the participation fee remains minimal so that it is affordable. That is the way. If we increase the fee like the Tokyo Marathon, I promise we would get income, but we do not do that because we feel this is an event that involves all runners.
Therefore, we maintain our fee, and we request additional support from the private sector, from the private parties, for sponsorship. As for the second question, the Second Penang Bridge is actually a critical infrastructure. That means it is a critical infra and is not managed by the State Government. Any closure of the First Penang Bridge or the Second Penang Bridge requires approval from three parties. For the approval of the Second Bridge, approval is needed from Jambatan Kedua Sdn Bhd, approval is needed from the Malaysian Highway Authority (LLM), and the Ministry of Works (Kementerian Kerja Raya) is also required; the Minister has to sign to close the bridge. And we have been informed that the authorities I mentioned earlier have limited the closure to a few times a year; it cannot be closed every month. If the bridge is closed every month, road users will flood the hotline, e-mail or social media of LLM and JKSB, because the bridge is a critical place.
Therefore, I say we still maintain PBIM as a main event, but if there is an opportunity to add more, approval from all three parties is needed. I would also like to take this opportunity to advise private event organisers that if they wish to use the First Bridge or the Second Bridge for sports activities and such, or sports tourism and such, they must obtain approval from these three authorities before announcing the event, because this is indeed critical infrastructure that cannot be closed arbitrarily. When we hold an event, we only need to get approval; we submit the approval application one year before the event, then after getting approval, we must make payments and so on, and it must be closed at a certain time but reopened at a certain time for public use. That is the uniqueness of the use of the Second Penang Bridge or the First Penang Bridge.
Terima Kasih.
Tambah sikit.
One person only.
Boleh, okey.
Sila-sila.
Thank you for the answer from Paya Terubong. Just now, Paya Terubong mentioned that after the organisation of the Penang Bridge Maratahon held in Batu Kawan, the organisation of marathons or Fun Runs in Batu Kawan has increased to 8 events. Therefore, does Paya Terubong intend to make the Marathon, Half Marathon or Fun Run more like the other events among these 8 events, and to raise the Penang Bridge Marathon to an internationally standard marathon event, which could increase fees to make the Penang Bridge Marathon one of the sources of revenue generation for the State Government? Because now there are 4,287, we can increase the number of Marathon participants.
We, I benchmark all of these against marathon events throughout the country. Marathons throughout the country include several Aim Certified ones, such as the Kuala Lumpur Standard Chartered Marathon and the Putrajaya Score Marathon. So we benchmark the participation fee against the two main marathons in the country. We cannot benchmark against the Tokyo Marathon or the Boston Marathon. That is why we benchmark against these, and we try to obtain more private sponsorship to further enliven the Marathon event. That is all my answer.
Okay, enough on the Marathon. Kebun Bunga, please.
Thank you, Dato' Seri Speaker. The first day brings back long-held longing. My question number five.
No.5 What are the State Government's achievements in attracting and promoting more MICE event organisation in Penang for the years 2024 to 2025?
(a) What additional steps will be taken to continue developing it?
Thank you, ADUN Kebun Bunga. Sorry, I do not have a pantun to reply with. For the period 2024 to 2025, the State Government of Penang, through the Penang Conventional Exhibition Bureau (PCEB), continues to strengthen the state's position as a main destination for business events, business event, in this region. Throughout 2024, Penang succeeded in attracting 2,059 business events involving 300,000 local and international participants, with an estimated economic contribution, economic impact analysis, exceeding 1.29 billion ringgit Malaysia. For the year 2025 until this August, more than 1,183 business events have been held in Penang involving 170,000 participants, with an economic impact analysis exceeding 800 million. In addition to active involvement in trade shows and road shows with the Malaysia Conventional of Exhibition Bureau or MyCEB, as well as the organisation of the Penang International Travel Exchange (PITE), PCEB has also implemented several new strategies to expand market reach with a new market in India, by opening a direct flight route between Chennai and Penang starting 21 December 2024. The Chennai-Penang flight has increased business tourism arrivals from India by more than 100% within the first nine months. In line with Visit Malaysia Year 2026, PCEB will launch a special promotion campaign on 24 November to attract more international event organisation to Penang. Furthermore, with the commencement of the already started operations of the Penang Waterfront Convention Centre (PWCC), PCEB has established a strategic operator partnership with PWCC, namely the Korea International Exhibition Centre KINTEX, to bring in more events from Korea, starting next week with the organisation of the KBeauty Expo from 20 to 22 November 2025. With the firm support of the State Government and industry partners, PCEB is confident that Penang will continue to emerge as a main regional business event hub, and at the same time invigorate the state's economy, while opening more high-impact job opportunities for the people. That is my answer.
Supplementary question. Thank you to the Honourable Paya Terubong. I would also like to know the latest status regarding the PWCC. Just now the Honourable Member said it would start next week, so I want to know the latest status of the PWCC, and also my second question, like Bukit Tambun, what income can the State Government obtain from organising the EXPO Perniagaan Conference? Just now the Honourable Member told us that for Year 2004 we had 2,500 activities up to August 2025, 1,800, but does it have a direct return, direct income to the State Government? If not, what steps or initiatives will the State Government take so that we not only see it invigorating the state's economy but also providing returns to state revenue. Thank you.
Thank you for the question. The PWCC has actually already started operations, I think in October; they have already begun operations with several national and international conferences. And I am pleased to report that on 20 November 2025, the Penang Waterfront Convention Centre was officially opened, it is already operational, but the official launch ceremony on 20 November will be attended by His Excellency the Governor and also the Governor of Gyeonggi Province, Korea, and the launch ceremony is on 20 November. And there are several international events being lined up to fill the PWCC. As was said earlier, the State Government helps the organisers to bid so that international events, like this week in Penang where we have the World Hainanese Congress organised in Penang with thousands of participants, and the State Government helps the organisers to manage and also bid for the project. And the figures I mentioned earlier, the economic impact analysis, are the secondary economy generated for hotels, F&B, airlines, restaurants, hotels and so on. And to answer the question from Kebun Bunga: the State Government receives returns from the State Government through hotel fee payments. If participants stay in hotels, they stay at our hotels and the hotels pay the hotel fee, collected by the hotel and then paid to the State Government. That is it, there is no other direct income apart from the hotel fee, but what I mentioned earlier is economic generation for all industries in Penang, because the arrival of these delegates in bulk, one international convention of 2,000 people, 3,000 people, they spend and so on, that is how we activate the economy, that is my answer.
Thank you. So I would like to invite Sungai Bakap, please.
Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Dato' Seri Speaker. Wake up in the morning and exercise straight away, my question number six.
No.6 What is the status of negotiations or implementation of the project to take water from the Perak River, and how far has it progressed to ensure long-term water supply for Penang?
Thank you, Honourable Dato' Seri Speaker, and thank you also to the Honourable Sungai Bakap. Honourable Member, the project to take water from the Perak River is a long-term strategic initiative to ensure the continuity of raw water supply to the State of Penang. This project is a solution to ensure the security and sustainability of the water supply and the long-term supply until the year 2050. The Perak State Government has appointed a consortium consisting of two (2) agencies, one being the Perak State Development Corporation (PKNP) and the other being the private company Gamuda Berhad, as the official representative of the State of Perak to hold negotiations with the Penang State Government. So a series of meetings have been held, and through the 3rd Negotiation Meeting of 2025 on 10 October 2025, both the Perak and Penang State sides have reached an agreed policy that will become the basis for the Penang State Government's consideration in making decisions regarding the proposal to purchase treated water from the State of Perak. The State Government, through PBA, has already signed a memorandum of understanding, or MoU, with the PKNP-Gamuda consortium on 6 November last, held at the Casuarina Convention Centre Hotel Casuarina Meru, Ipoh, for the treated water supply project from the Perak River. So with the signing of this MoU, it will enable Penang to purchase at least 300 million litres of treated water per day starting from 2031 from the State of Perak. This agreement is the result of intensive negotiations that set the main terms of water sales to Penang, including price, quantity and supply period, as the basis for the bulk water supply agreement that will be signed later. Both parties aim to finalise the Bulk Water Supply Agreement within six months, subject to the approval of the relevant authorities. Thank you, Honourable Member.
Terima Kasih.
Thank you, Honourable EXCO, for what was informed just now in this Honourable House that on 6 November 2025, recently, the Penang and Perak State Governments signed a memorandum of understanding, or MoU, for the sale of surplus treated water from the Northern Perak Water Supply Scheme (NPWSS) to Penang. My supplementary question is, what are the details of the MoU from the technical, financing and water distribution method aspects, including the water charges to be imposed?
My second question is, to what extent does this MoU guarantee Penang's water supply in the future, because what I understand is that Penang will receive a surplus from the project? So I ask the Honourable EXCO to please explain what has been raised. Thank you.
Thank you, Honourable Member, for your questions regarding the water project from Perak. Okay, the first question concerns the technical details. Based on the MoU that has already been signed, what is called the variable charge is RM1.70 per cubic metre. This is based on how much water we buy. Second, there is a fixed annual capacity charge of RM210 million a year. This is for the construction of a 500 mld water treatment plant, and there is also, these are the main costs,
which have already been agreed. Apart from that, the concession period is 40 years, yes, between the State of Perak and, what is this, this consortium, and after 20 years, in the 21st year, the prices set can be renegotiated.
So, Honourable Member also asked just now about the second question, whether this project can solve the problems we have, Honourable Member. In fact, the 300 mld that will be taken from the State of Perak is at least the minimum. The water treatment plant built is 500 mld, and this water treatment plant is built only to supply water to the State of Penang. For Perak's use, another separate water treatment plant will be built, which will draw from the Perak River, not 500 mld but 1,500 mld from the State of Perak. This is The Perak Water Transfer, where a pump house will be built downstream of the Chenderoh Dam, which will pump water into a tunnel that will pierce a hill and emerge near Bukit Merah. Then at Bukit Merah, a 500 mld water treatment plant will be built, or at any nearby location, it is up to the State of Perak to carry out water treatment for the State of Penang, and the plant to be built is specifically for the use of the State of Penang.
So, of the 1,500 mld that will be taken from the Perak River, the most Penang can take under this agreement is 500 mld, because the treatment plant built is at most only 500 mld, but at least 300 is what we will get. When it is said that the water is excessive, if we use the logic that 1,500 mld is a very large amount, if Penang takes at most 500 mld, that is only one-third of that large amount. I think there is no problem. However, in this agreement we have the minimum guaranteed amount, which is 300 mld. So, come what may, the State of Penang is assured of receiving 300 mld of non-stale water (interruption) Mr Speaker, the water is of high quality from the State of Perak. Thank you, Dato' Seri Speaker.
Supplementary question. Thank you, Dato' Seri Speaker. My supplementary question: I was interested in a piece of information where, in the MoU, the government, the State Government, must pay a fixed annual charge every year of RM200 million a year (interruption) RM210, not RM200. So I want to know how this amount was determined. Did the State Government agree to the RM210 million charge that must be paid for 20 years, if I am not mistaken, 40 years? So this is a very large figure. What I understand, and if I am wrong, perhaps it can be corrected, is that when this project starts, the State Government will only buy treated water from the State of Perak. Originally we wanted raw water, but we could not get it; the State Government of Perak only wants to give treated water. So what we understood in the State Assembly, the previous sitting, is that the State Government would only buy treated water, the cost is whatever, if they want to charge RM1.70 per cubic metre as mentioned by Tanjung Bunga just now. So, is it not that we only buy at the rate that has been set, the RM210 million, that is indeed the case? So how must we bear such a high cost? I ask for an explanation. Thank you.
Thank you, Honourable Machang Bubuk, a good question. I will try to give an explanation, (interruption) a little less, CM. A little less. Okay, as I said earlier, it is a water treatment plant, and not only a water treatment plant; it includes other infrastructure related to the project, built only for the State of Penang. It is different if there is already an existing large water treatment plant and we just want to take a little (interruption), ha, we just want to connect our pipes and pay, okay, perhaps the cost of connecting the pipes and the water we take. But this one requires building a new project, a new infrastructure: a 500 mld water treatment plant, which is very large, with a full reticulation system, a pipe system to bring water to Penang, balancing tanks and reservoirs, all of which must be built at the Kerian River as well. All of this will be borne by PKNP Gamuda, okay. So we also take into account the financing cost, because for PKNP Gamuda, all this infrastructure is in the region of three billion ringgit. Yes, three billion ringgit. So three billion ringgit with financing costs over 40 years, Honourable Member can calculate it yourself, is a very large amount. But the State Government also carried out due diligence. We looked and we did benchmarking. The benchmarking we did is based on projects we have done with PAAB, Perbadanan Aset Air Berhad, a federal government agency. So we compared the financing cost offered by PAAB and what was proposed by PKNP Gamuda. It is very competitive. Yes. So it is like us building a water treatment plant and building small infrastructure too, which would cost billions of ringgit.
So, but by spreading the cost over these 40 years, it means the State Government does not need to, and PBA does not need to, raise high capex. We only pay a fixed capacity charge, plus, in addition to that, we pay what, the variable charge, which is for the water we use, Honourable Member. I hope that is clear, clear enough for Honourable Member.
Thank you. I now invite the question from Pengkalan Kota.
Thank you, Dato' Seri Yang di-Pertua. My question is question number seven.
No.7 What is the status of Penang as a medical tourism hub, and what efforts are being taken to maintain Penang's status as that regional hub?
Thank you, Honourable Pengkalan Kota. Penang is now recognised as a leading medical tourism hub in Malaysia and Southeast Asia. This is the result of a combination of internationally standard medical facilities, globally recognised healthcare professional expertise, and robust tourism infrastructure support. The state contributes more than 40% of the total number of health tourists to Malaysia and has become among the main destinations for international patients, especially from Indonesia and China, seeking high-quality treatment at reasonable cost, compared with other regional destinations such as Singapore and Bangkok.
Penang has international-standard private hospitals equipped with the latest technology, including robotic surgery systems, cancer treatment based on modern technology, and cardiology and orthopaedic facilities comparable with those of developed countries. High-quality healthcare combined with a comfortable tourism environment and easy access make the State of Penang the top choice for international health tourists.
Through the Penang Centre of Medical Tourism (PMED) under Penang Global Tourism, which has 18 institutional and health members, the State Government continues to strengthen the medical tourism ecosystem through various strategic initiatives, including collaboration with airlines such as AirAsia through the boarding pass programme, joint promotion with the Malaysia Healthcare Travel Council, MHTC, participation in international expos such as the Malaysia Healthcare Expo, MHX, in Bandung and Jakarta, and organising familiarisation trips for tourism agents and foreign media practitioners.
In addition, Penang also stands out in the wellness tourism approach, which combines modern medical treatment with rejuvenation experiences based on a healthy lifestyle, such as health spas, holistic treatments and nature tourism. With a promotion strategy supported by Penang Global Tourism, PGT, and PMED, the State of Penang not only remains the main health tourism destination in Malaysia, but is also moving towards becoming a world-class regional medical tourism hub by 2030.
Supplementary question. Is the State Government planning to implement a health tourism tax on foreign nationals who come from afar to receive medical treatment in the State of Penang? My second question is, what is the impact on medical tourism, given the increase in the value of the Malaysian ringgit against foreign currencies, as well as the impact of the sales and services tax, SST, imposed on medical tourism? At the same time, Penang receives many direct flights from abroad and from overseas. Thank you.
Many questions, yes. Thank you. The State Government has not yet implemented a medical tourism tax. However, we only collect a hotel fee from those who stay at hotels and make accommodation payments. And regarding, in this fourth term, we will launch several important new flights. Among them, the airline TransNusa will launch its flights from Jakarta to Penang, and Batik Air will start flights from Medan to Penang and from Singapore to Penang. Scoot Airline will also increase the frequency of its flights from Singapore to Penang, and Hong Kong Express has increased the frequency of its flights from Hong Kong to Penang. Through the strategy of adding flights as well as promotion, we hope we can penetrate the medical tourism markets in this region. That is my answer.
With permission, Most Honourable Member. Just a very quick supplementary question. Regarding the question that was already asked just now, about SST. So, the Federal Government has now set SST on foreign patients at 6%. I hope the question I asked earlier can also be answered. What is the effect of this SST on tourism, on our state's medical tourism, considering that this medical tourism generates RM800 million
RM1 bilion.
RM1 billion a year for our state's economy. That is my first question, and the second: does the Most Honourable Member agree that if the Federal Government continues to impose this SST, our state should also demand that a portion of the SST collected be returned to Penang, as with the tourism tax that was done previously. Thank you.
Thank you to the Honourable Member from Bukit Tengah, who is also Chairman of the Federal-State Relations Committee. I do agree with the Honourable Member's proposal just now. The sharing of SST, and we may need to bring this issue to a higher level, the federal level, Parliament level and so on, so that there is a sharing formula like the sharing of the tourism tax between the Federal Government and the State Government. The SST side should also be considered, but. However, we do not yet have a specific study on what the impact of SST is on the medical tourism industry. We do not yet have a specific study, and I appreciate the Honourable Member's proposal, thank you.
Thank you. KOMTAR, please.
Thank you, Honourable Dato' Seri Speaker. My question is question 8.
No.8 What are the new strategies and achievements for the George Town Festival (GTF) this year?
List the efforts that have been taken to raise awareness and foster.
Thank you, KOMTAR State Assemblyman. The 16th edition of the George Town Festival was held from 2 to 10 August 2025. The George Town Festival 2025 introduced the theme "connection", focusing on art events that reflect the human life experience. GTF, or George Town Festival, highlights creativity, heritage and cultural innovation. GTF focuses on developing a sustainable and inclusive arts ecosystem by providing space for local, national and regional arts practitioners. Through international collaboration and the application of digital technology such as online platforms, virtual exhibitions and digital interaction, GTF expands reach and community engagement. The festival continues to remain relevant as a dynamic space that connects art, community and global society.
Through theatre, music, dance, photography and visual arts, this festival shows new ways of appreciating art, arousing imagination and emotion, and highlighting the role of art in human life. Workshops and sharing sessions were also held to foster interest among the local community, including community activities such as the George Town Festival, the first to be brought to GTF in Paya Terubong, and also activities such as Macam-Macam Berapit and several other activities. Digital activities such as Terang: Projection Mapping, with projection mapping onto the heritage building of Town Hall, which received a very good response. Symbiosis Crab Chronicle and stories emotion a videography workshop by Canon, and many more.
And activities by local artists were also given attention, and international activities under the sponsorship of the Spanish Embassy in Malaysia, in collaboration with the Taipei Economic and Cultural Office, and we also brought the Ombak Potehi performance held at GTF to the Singapore Night Festival held in August 2025. And we also carried out other activities. To raise awareness and foster interest among the local community, GTF 2025 organised more than 50 programmes, with 80% of those programmes opened free to the public. A total of 186,000 people, or 97.67%, took part in the free, or non-paid, programmes. This festival also involved 520 people, 526 people, that is 526 local participants, which is 71.96% are local participants. That is my answer.
Terima kasih.
Supplementary question. Thank you, Honourable Paya Terubong. Indeed, GTF is a good programme for raising Penang's name. So, could the Honourable Member explain the cost of organising GTF, and whether the State Government or the organisers will seek large sponsors to, together, support this GTF programme and make this GTF programme even bigger, and what efforts are carried out by the organisers to promote GTF overseas. That is all for my supplementary question.
Thank you for that question. The State Government, for GTF 2025, allocated RM1.5 million for organising this activity. Just now I mentioned Spain, Taipei and so on. We cooperate with foreign missions, which have sponsored several show activities. That is it, and we will also obtain private sponsorship as I mentioned just now to enrich it. But, and we will also, when we make visits abroad, tourism roadshows abroad, we will also highlight arts activities, among them GTF, everywhere, so that, and it has, it has stood out as a regional programme.
Therefore, we received support from Spain and also several embassies that I mentioned just now. And for the Honourable Member's information, in 2009, when GTF began, there was only one festival in Penang, GTF. But over the past 10 years, since GTF was born, several festivals have been born. Among others are the Butterworth Fringe Festival, the Nibong Tebal Festival, which will also be organised, the Kepala Batas Festival, the Seberang Perai Heritage Festival, and JKKN has also organised the Balik Pulau Festival. Thus, GTF as a foundation has now given rise to offspring festivals in several districts and locations. That is our aspiration: to see not only in George Town an arts festival, but beyond George Town, outside George Town, in various places we have arts festivals resembling the spirit of the George Town Festival. That is my answer.
Terima kasih.
Soalan tambahan.
Satu lagi.
Okay Dato' Speaker, thank you. Honourable Speaker, I have a question about the George Town Festival. Coincidentally, I have the figures for the George Town Festival through a written question. What I found here is that although the George Town Festival started in 2010 with an allocation of RM1 million, because it received very good response, the allocation reached RM4.5 million in 2017. However, now it has only reached, it has only RM1.5 million left.
With this, I also want to, I would like to ask that since the George Town Festival has gone to many places in rural areas such as Berapit, and for several consecutive years the Macam-Macam Berapit programme has received very encouraging response. It is also an extension programme of the George Town Festival. But I want to ask, does the Honourable Member for Paya Terubong intend for the allocation for the George Town Festival to be increased in the future so that we can truly get artistes, popular artistes from abroad, as in 2017? Thank you.
Thank you for this Berapit question. Indeed, we also want to add to the allocation for arts festivals, but as I said earlier, we have to divide the resources we have among the various festivals across Penang, because it seems we have to cut back a little for other areas, that is how it is, but there is an opportunity that we will further increase the allocation and also the prestige of the George Town Festival.
Thank you. Penaga. Please.
Thank you, Dato' Seri Mr Speaker. Penaga's question number nine.
No. 9 What is the actual location of the land purchased or identified by MAINPP (Penang State Islamic Religious Council) in Barat Daya District using the RM15 million allocation (2025)? (a) State the type of land, area and mukim. (b) What is the transaction status (finalised or under negotiation)? (c) What is the development objective for the land?
Thank you, Dato' Seri Mr Speaker, and also Penaga. Regarding this question number nine, which concerns the actual location of the land purchased or identified by the Penang State Islamic Religious Council in Barat Daya District using the allocation of 15 million ringgit, and states the type of land, area and mukim, what the transaction status is, and what the development objective is, my answer is simple: until now, there is no land that has been identified, negotiated and finalised using that allocation.
Thank you, Honourable Member for Batu Maung, for the brief explanation provided. Although if we look at the page of Dato' Seri, Dato' himself, dated 20 July, there is indeed an allocation for purchasing land in the Barat Daya area with a value of RM15 million. My question is because there are also some that I received here, land that is to be sold and has been forwarded to the Penang State Islamic Religious Council, the letter is dated 11 August, which means from 11 August until today it has been three months at the Penang State Islamic Religious Council.
So my supplementary question is, if possible, this land in the Barat Daya area with an area of approximately 204,000 square feet in Mukim 6 Pondok Upeh Barat Daya, can the Penang State Islamic Religious Council, and is it possible, for the council to consider the offer that has been made by the landowner to the council, so that firstly, the offer that has been made is that the council may purchase the land offered at a value of RM11,251,00.00, or secondly, the offer that has been made is a joint venture exclusively between the landowner and the Islamic Religious Council, so that the council can consider and ensure that the land remains in the ownership of bumiputera, in the ownership of, in the ownership of Malay Muslims in Penang, because that letter has already been sent and I request that the Honourable Member himself, as the Chairman of the Council, consider the land. Thank you.
Supplementary question or comments. Okay, as I announced, as I recall at Pondok Upeh school, I made that announcement, this RM15 million is from the istidal fund, and when this istidal fund is for us to replace the waqf land that has been taken over by the government, with a limited allocation. So I made that announcement at the programme at Pondok Upeh School to entice landowners to make offers to the Islamic Religious Council from that fund. My intention and purpose indeed, after that announcement, many offers have been made by landowners not only in Barat Daya District but throughout Penang to sell to the Islamic Religious Council, but we have not yet identified the process. Such matters will be brought up and tabled in the Meeting of the Islamic Religious Council's Asset and Property Committee, that is, the process will be identified. Secondly, when we identify the land to be purchased in Barat Daya District, the next process is through evaluation by the JPPH before being brought to the Penang State Islamic Religious Council meeting for a decision, and if the land is for development, we will first look at the status of the land. So, God willing, as the view put forward by Penaga will be considered in the meeting I mentioned earlier.
Thank you. The Honourable Members' 1 hour 30 minutes for oral questions has therefore ended, in accordance with the Rules of the Meeting of the State Legislative Assembly.
Honourable Mr Speaker. The answers to the oral questions that were answered just now will be placed on the desks of the Members who asked them and will be included in the official record. Thank you.
MOTIONS 6B AND 6C
Thank you, Honourable Chief Minister. Honourable Members, I, as Speaker of this House, wish to propose to this august House, in accordance with sub-rule 15(3) of the Rules of the Penang State Legislative Assembly Meeting, that the order of business of the meeting be amended by hearing Motions 6B and 6C first. The purpose of this change in order is to smooth the proceedings of the meeting, which will be adjourned at noon for Friday prayers, and I want to ensure that the tabling of the Supply Bill 2026 and the Development Estimates Motion 2026 can proceed more smoothly. So, Members who agree, say yes.
Ya.
Those who do not agree, say no. We all agree, yes. We will hear Motions 6B and 6C first.
Motion by the Honourable Chief Minister.
Thank you, Honourable Dato' Seri Speaker of the House. I humbly propose that this House approve the motion for the Reclassification of the Trust Agreement for the Caring Society Complex Management Trust Fund (KMP), which was established under Section 9 to Section 10 of the Financial Procedure Act 1957.
For the information of this august House, Section 10 of the Financial Procedure Act 1957, or Act 61, provides for the establishment of Government Trust Funds based on a resolution of the Federal or State Legislative Body to account for receipts from government allocations and payments for specific special purposes. Guidance on the procedures for managing Trust Accounts or Trust Funds is set out in the Malaysian Treasury Circular WP10.4. Based on that circular, every establishment and closure of a trust account under Section 10 of the Financial Procedure Act must be carried out through a resolution of the Legislative Body. The Caring Society Complex Management Trust Account in Penang was established in 2009 as a Public Trust Account under Section 9 of the Financial Procedure Act 1957. It was to account for allocations channelled by the State Government, receipts and contributions from various parties, as well as collections of rental for office space, halls and other facilities under the management of the Caring Society Complex, for the purpose of implementing and financing the programmes, activities and development of the KMP.
The establishment of this trust account under Section 9 of the Financial Procedure Act is inaccurate because it covers allocations channelled from the State Government, whereas the establishment of a Trust Account should properly be under Section 10 of the Financial Procedure Act. This was noticed through the rationalisation exercise of State Government Trust Accounts and Trust Funds carried out in 2023, which drew the attention of the National Audit Department in line with the requirement for channelling State Government allocations through the KMP Management Trust Account to finance and implement the programmes, activities and development of the KMP. Therefore, reclassifying this Trust Account from Section 9 of the Financial Procedure Act to the KMP Management Trust Fund, as a Government Trust Account under Section 10 of the Financial Procedure Act, is appropriate.
The management and administration of this Trust Fund are regulated by the financial and accounting rules in force, which are outlined under this Act and the Treasury Instructions, Treasury Circulars, Malaysian Accountant General's Circulars, and the Rules and Treasury Instructions and State Financial Authority issued from time to time. This Trust Fund will be closed when it is no longer required, through the approval of the State Legislative Body, namely the State Legislative Assembly, and its balance, if any, will be credited to the State Revenue Account. Dato' Yang, Dato' Seri Mr Speaker, I humbly propose.
Are there any Honourable Members who support this motion?
Honourable Mr Speaker of the State Legislative Assembly, I humbly support.
Thank you. Honourable Members, although this is a motion which I see only seeks to reclassify an old section into a new section, I also want to ask the House. Honourable Members who wish to debate the motion that has been brought by the Honourable Chief Minister may be invited. Okay. Then, Honourable Members.
Ya.
Sila.
Briefly, I only want clarification. Thank you for the opportunity given. As stated by the Honourable Chief Minister, indeed the Caring Society Complex Management Trust Fund must be classified correctly under Section 10 and not under Section 9, where many funds have already been reclassified, such as the Forest Development Fund which was done previously. The Government Trust Fund consists of Revolving Funds and Trust Accounts established to receive State Government allocations for payment for specific purposes under Section 10 of the Financial Procedure Act. Among them are the Humineter Vehicle Loan Fund, Personal and Miscellaneous Advances, Student Loan Fund, State Jana Raya Maintenance Fund, State Investment Trust Fund, State Disaster Relief Trust Fund and other funds.
Overall, if we look at the total in the Trust Funds, it has decreased by RM30.54 million in 2024 to RM118.61 million compared with 2023, which totalled RM129.15 million. I want to ask whether this amount will increase after this reclassification is carried out, and indeed this is a Trust Fund which will certainly not have a significant effect on the State's financial position, but as the Honourable Chief Minister mentioned, it is indeed necessary for audit requirements and also to ensure it follows the correct procedures. This issue is indeed supported by my side, and I believe by all the ADUNs, because this is an audit requirement, not for any other purpose. Thank you.
Thank you. Honourable Members, if there is no one else who wishes to debate, I would like to invite the Honourable Chief Minister to make the winding-up speech, please.
Thank you, Dato' Seri Mr Speaker. Thank you to Honourable Members of the House, especially the Honourable Member for Air Putih who took part in the debate. This motion is put forward to ensure that the financial management and governance of the Trust Account which channels State Government allocations to the Caring Society Complex, KMP, is implemented more accurately, transparently and in compliance with the existing legal requirements, especially when it has been identified by the National Audit Department, so this is a follow-up action that must be taken under the correct and relevant section. So I think in the speech to introduce this motion, I have also explained the purpose and why it needs to be implemented, and I give a commitment that the State Financial Office and the State Government will always be attentive to financial procedures and governance in managing the trust funds in the State Government Trust Account of Penang. So I would like to record my appreciation to all Members of the House and also to the Office of the State Secretary, the Legal Adviser, and the Secretariat of the State Legislative Assembly for their cooperation and support throughout the process of preparing and tabling this motion, and with this I humbly seek the support of the Honourable Members to approve this motion.
Thank you, Honourable Chief Minister. Honourable Members, the winding-up session is now complete. The question before us now is the motion that this House approves the Motion for the Reclassification of the Trust Agreement for the Caring Society Complex Management Trust Fund, which was established under Section 9 to Section 10 of the Financial Procedure Act 1957. Is it agreed? Honourable Members who agree, say yes.
Ya.
Those who do not agree, say no. So we all agree that this motion is accepted. Thank you.
Motion by the Honourable Deputy Chief Minister II.
Sila.
Good morning and greetings to the Honourable Dato' Seri Speaker and all my colleagues in the House this morning. I would like to humbly propose that this House approve the revocation of the appointment of YBhg Dato' Abdul Fareed bin Abdul Gafoor as Deputy Chairman and also Puan Regina Amalorpava Mary A/P Aboorvasamy as a member of the Appeals Board, effective from 15 November this year. The new appointments, the Deputy Chairman and four Members of the Appeals Board under the Penang Freedom of Information Enactment 2010, namely Enactment 16, for session 24 to 27 for the period from 15 November this year until 31 May 2027, are as follows. Dato' Seri Speaker, the Deputy Chairman will be replaced by Encik Simon Murali A/L Kalimuthu, and the new members are YBhg Dato' Roslinda Mohammad Shafie, Encik Harcharan Singh Najar Singh, Encik Dominic Pillai a/l RK Pillai and Encik Shamsul Azhar bin Hasan. That is all, Honourable Dato' Seri.
I need the Honourable Member to support this motion.
Thank you. Honourable Dato' Seri Speaker, I humbly support.
Thank you. Honourable Members, this too is a motion to update membership of the Appeals Board, so I would like to invite anyone who wishes to debate to do so. If there is none, I would like to ask whether anyone wishes to wind up.
Dato' Seri Speaker it is a formality just to regularize the position because Dato' Abdul Fareed bin Abdul Gafoor, who is to be replaced, has already become a judge, so he cannot, and then Puan Regina, who is a former magistrate, wants to retire, so that is the main reason. So, for the others, there are names that I have already stated. For the Chairman of the Appeals Board, Honourable Dato' Seri Speaker, it is still Dato' Seri K. Kumarendran, Dato' Seri K. Kumarendran he will continue. Encik Simon will become the new Deputy Chairman, and then I think there are eight (8) members in total, Dato' Seri Speaker, so, acting on the flow, I have to say because this motion is very formal. Thank you, Dato' Seri.
Thank you. The question before us now is the motion that this House approves the revocation of the appointment of YBhg Dato' Abdul Fareed bin Abdul Gafoor as Deputy Chairman and Puan Regina Amalorpava Mary A/P Aboorvasamy as a member of the Appeals Board, effective 15 November 2025. The new appointments of the Deputy Chairman and four members of the Appeals Board under the Penang Freedom of Information Enactment 2010 (Enactment 16), session 2024/2027, for the period from 15 November 2025 until 31 May 2027. The list of Appeals Board members is as follows: firstly, Encik Simon Murali a/l Kalimuthu as Deputy Chairman; secondly, YBhg Dato' Roslinda binti Mohammad Shafie as member; thirdly, Encik Harcharan Singh a/l Najar Singh as member; fourthly, Encik Dominit Pillay a/l Arkid Pillay as member; fifthly, Encik Shamsul Azhar bin Hasan as member, to be agreed. Members who agree, say yes.
All Members
Yes.
Those who do not agree, say no? So we agree to this motion. Honourable Members, the Supply Bill 2026 and the Development Estimates Motion 2026 will only begin at 3.00 pm later. The House is adjourned and we will reconvene at 3.00 pm later.
The House was adjourned at 11.24 am.
The House resumed at 3.00 pm.
Supply Bill 2026 and Development Estimates Motion 2026.
Please, Honourable Chief Minister.
Honourable Mr Speaker, I beg to propose that the Bill entitled, An Act to authorise the use of a sum of money from the Consolidated Fund for services for the year 2026 and to appropriate that money for services for that year, be read a first time.
Boleh.
Honourable Mr Speaker of the State Legislative Assembly, I beg to second.
Terima kasih.
A Bill entitled, An Act to authorise the use of a sum of money from the Consolidated Fund for services for the year 2026 and to appropriate that money for services for that year.
The Bill has been read a first time.
Honourable Mr Speaker, pursuant to Sub-Rule 59 of the Penang State Legislative Assembly Standing Orders, I propose that the second reading of this Bill proceed immediately.
Appropriation Bill 2026, second reading.
Sila.
Honourable Mr Speaker and Honourable Members of the House, I beg to propose that the Bill entitled, An Act to authorise the use of a sum of money from the Consolidated Fund for services for the year 2026 and to appropriate that sum for the year 2026, be read a second time now.
Sila.
Dato’ Seri Yang di-Pertua, Penang was once known as the Pearl of the Orient, or, with permission, The Pearl of The Orient, for its uniqueness and diversity, from the UNESCO World Heritage Site in George Town, the high-tech industrial areas in Bayan Lepas and Batu Kawan, the agricultural areas in Seberang Perai, to the tourist destinations in Batu Ferringhi and Teluk Bahang, which prove that Penang has everything, or, with permission, Penang Has It All.
Therefore, to ensure that the State Government continues to steer Penang on the right course in meeting the demands of the post-normal environment towards 2026, I stand in this August House to present the Penang State Budget 2026. As stated by the late Tun Abdullah Ahmad Badawi, the Fifth Prime Minister of Malaysia, during the 2006 Budget Presentation, spending is not merely a matter of figures but a matter of trust: every sen must give returns to the people and to the future of the nation.
Based on this statement, the Penang State Budget is not merely displaying figures but translating fiscal decisions grounded in noble values, accountability and social justice, which are the core of the Penang State Government. The Penang State Budget 2026 has been framed based on the core of the Penang2030 Vision to make Penang a smart and green state founded on family, inspired by the nation, which is also in line with the Malaysia MADANI Aspiration, as translated in the 2026 Budget speech by the Honourable Dato’ Seri Utama Anuar bin Ibrahim, Prime Minister of Malaysia and Minister of Finance, on 10 October 2025.
Mr Speaker and Honourable Members of this August House, 2025 witnessed trade competition between the major powers of the world. This situation is squeezing the fiscal and economic ecosystems of developing countries, including Malaysia. Inflationary pressures and tariff increases have triggered a domino effect of economic crisis, which can be seen through rising prices of goods and raw materials and the uncertainty of global financial markets.
In retrospect, Penang’s economy grew by 4.8% in 2024 compared with 3.3% recorded in 2023, with total GDP reaching RM121.5 billion, driven by the services and manufacturing sectors. According to the Department of Statistics Malaysia (DOSM), Penang contributed 7% of the national GDP in 2024. The services and manufacturing sectors remained the largest components of the state’s GDP, with a cumulative contribution of 94.3%. This was followed by the Construction Sector at 3.2%, the Agriculture Sector at 1.8% and the Mining and Quarrying Sector at 0.1%. For 2025, the State Government is confident that the state’s GDP can expand to 5.4%, driven by the growth of the Electrical and Electronics Sector and increased global demand for semiconductors.
Dato’ Seri Yang di-Pertua, the Penang State Government’s Financial Statements for 2024 received the Auditor General’s Certificate without qualification on 7 August 2025. This recognition truly reflects the principles of “Efficiency, Accountability and Transparency” that have been instilled as the work culture of the State Government administration. Therefore, I take this opportunity to record my appreciation to all State Civil Servants who have cooperated with the State Finance Department in ensuring that Penang continues to remain among the best states in terms of the auditing of financial statements.
On average, the State Government spent about RM831.37 million a year from 2020 to 2024, based on the awareness that such expenditure has reduced the state’s financial reserves, or known as the Consolidated Revenue Account. In light of this reality, the State Government always strives to minimise the expenditure deficit, knowing that the average state revenue is only about RM631.6 million, while the average decline in the balance of the consolidated revenue account is RM199.77 million a year for the latest 5-year period, from 2020 to 2024. Therefore, to ensure that the Consolidated Revenue Account remains stable, the Penang State Budget 2026 has been framed more systematically, by focusing on generating state revenue that has a direct impact on the people without compromising expenditure needs, especially those involving the interests of the people.
Today, the Supply Bill 2026 is tabled to obtain statutory authority to enable the State Government to implement supply expenditure for 2026 amounting to RM1,050,875,684.00, or in summary RM1.051 billion. Meanwhile, RM37,0072,950.00 is allocated to cover statutory obligatory expenditure for 2026 under the Consolidated Fund, making the total estimated state expenditure for 2026 RM1.088 billion, or in full RM1,087,948,634.00. The components of operating expenditure consist of emoluments amounting to RM226,733,229.00 or 20.84%, Services and Supplies amounting to RM200,509,235.00 or 18.43%, Assets amounting to RM3,593,203.00 or 0.33%, while grants and fixed charges amounting to RM645,731,927.00 or 59.35%, and other expenditure amounting to RM11,381,040.00 or 1.05%.
In comparison, the estimated Operating Expenditure for 2026 shows an increase of RM147.72 million or 15.71% compared with 2025, which proposes that all general objects, or OA, of operating expenditure for 2026 increase except for assets, or OA 30000. The increase in emoluments of RM19.19 million or 9.25% is due to the implementation of the second phase of the Public Service Remuneration System, SSPA, involving basic salary increases of 7% for the Management and Professional Group and the Implementation Group, while the Top Management Group will receive an increase of 3%. The increase of RM6.58 million or 3.39% involving Services and Supplies for 2026 is due to the increase in the minimum wage policy from RM1,500.00 to RM1,700.00, which involves the cost of State Government Contracts for cleaning, maintenance, security and existing contract services. In addition, the increase is also due to the rising cost of organising State Official Events, as well as increases in utility and fuel tariffs paid under OA 20000. The increase in grants and fixed charges of RM113.03 million or 21.22% is due to the increase in contributions to the State Development Fund from RM180 million in 2025 to RM265 million for 2026, to meet the needs of State Development Expenditure for 2026.
In addition, the increase in OA 40000 is due to adjustments of operating grants to government-linked companies, GLCs, statutory bodies and State Agencies, as well as allocations to the MMK Committee under the object of OS42000, which takes into account the needs for 2026.
The significant increase in other expenditure for 2026 of RM9.96 million occurs because the State Government has allocated RM10 million a year as repayment of the loan to the Penang Water Supply Corporation, involving the Restructuring of State Water Services with the Federal Government. As I have stated earlier, the estimated Development Expenditure for 2026 and the estimated Operating Expenditure for 2026, totalling RM1.088 billion, also cover the contribution to the State Development Fund of RM265 million to meet the state development expenditure commitments totalling RM318.62 million.
In comparison, the estimated Development Expenditure for 2026 increases by RM98.62 million or 44.83% compared with 2025. The main focus of the State Government for 2026 is on High-Impact Projects involving strategic interests, including land acquisition for the implementation of the Laluan Mutiara LRT Project, the Gurney Bay Phase 2 Project, the Silicon Island Development, as well as extension projects under the Penang Transport Master Plan, which are among the major developers of the state’s development.
Apart from new projects, 122 extension projects have been listed for 2026, covering various development categories such as public infrastructure, community facilities and special economic projects. This total reflects the continuing commitment of the State Government in implementing development projects for the benefit and convenience of the people. Among other development projects listed for 2026 are the Enlargement Project of the Museum and Art Gallery, the Bukit Bendera Development Project, the Construction of the Hostel Building for the State Sports Council, and the Construction of a New Building for the Northeast Syariah Magistrate’s Court.
In addition, several community hall construction projects, such as Dewan Batu Maung, Dewan Kampung Baharu Alma and Dewan Taman Senangin, are also listed as extension projects for 2026. On this occasion, the State Government expresses its appreciation to the Federal Government for approving several major and high-impact projects under the RMK-13 as announced by the Honourable Prime Minister during the presentation of the 2026 Budget recently.
This is because the Federal Government has approved all 10 first rolling plan wish list items of RMK13 submitted by the State Government, valued at RM283 million, with an allocation of RM54.5 million for 2026, involving 10 projects in our wish list: 1) Traffic and land use study on the proposed construction of Pan Island, Island Link; 2) Preliminary works for the upgrading of FT 006 from Bayan Lepas to Teluk Kumbar, Section 20 to Section 23, South West District, for design;
3) The Deputy Speaker is there, haa. He cannot speak, he can only clap. Thirdly, the Project to Upgrade Muka Sauk at Titi Kerawang and Teluk Awak, as well as the installation of raw water pipes from Muka Sauk to Teluk Bahang Dam and other related works; 4) Construction of Type 2 Health Clinic, Kubang Semang and the Central Seberang Perai Integrated Health Complex; 5) Preliminary Works for the Multi-Storey Block Construction Project at Kepala Batas Hospital; 6) Upgrading of Bertam Sports Complex, Kepala Batas; 7) New construction of Juru National Secondary School, SPT District, containing 36 classrooms and other facilities according to standards; 8) Preliminary Works for the Construction of an Underpass connecting Mount Erskine Road to Burma Road at the junction of Mount Erskine Road, Gottlieb Road, Burma Road and Bagan Jermal Road, Bagan Jermal Section A, Underpass; 9) Feasibility study on the Development of Tuna Investment in Penang towards National Food Security; and 10) Empowerment of Fish Market in the State of Penang.
Dato’ Seri Yang di-Pertua and Honourable Members, basically these approvals and commitments clearly reflect the concern and strong support of the Federal Government towards Penang in ensuring that the state’s development continues in step with the national development agenda under the Malaysia MADANI framework.
Taking this opportunity, I call upon all departments and implementing agencies at State and Federal levels to be mobilised in an integrated manner, with a spirit of shared responsibility, to ensure that each of these development projects can be realised successfully.
Meanwhile, the signing of the Memorandum of Understanding, MoU, between the Penang Water Supply Corporation and the PKNPk Gamuda Consortium for the Bulk Treated Water Supply Project on 6 November last, will enable Penang to purchase at least 300 million litres of treated water per day from Perak State starting in 2031 when the project is completed.
Overall, the MoU will provide access to a second major water source, which is very important for meeting the long-term needs of the state in line with the commitment to ensure that the Water Contingency Plan 2030 that has been drawn up runs smoothly according to plan.
Revenue estimate for 2026, Dato’ Seri Yang di-Pertua and Honourable Members of this August House, the estimated state revenue for 2026 amounts to RM1068,32,417.00, or in summary RM1.068 billion. Generally, the estimated revenue for 2026 increases by RM161.44 million or 17.81% compared with 2025. In terms of the breakdown of revenue, a total of RM269,783,213.00 is estimated as Tax Revenue. Meanwhile, a total of RM699,686,750.00 is Non-Tax Revenue, and a total of RM98,562,454.00 is Non-Revenue Receipts. As usual, Non-Tax Revenue is expected to remain the main contributor to state revenue through projections of premium payments and special charges receipts, as well as investment interest that provides consistent returns.
The State Government also anticipates an increase in tax revenue, especially Direct Tax through the New Land Tax Rates starting in 2026. Nevertheless, the State Government will introduce land tax rebates to ensure that landowners are not affected by the new tax rates, by taking into account the estimated state revenue of RM1.068 billion compared with the estimated expenditure of RM1.088 billion. The Budget for 2026 witnesses the lowest estimated deficit in the history of the Penang State Budget, which is RM19.92 million, compared with the projected deficit for 2025 of RM33.63 million.
2026 will witness the Penang2030 Vision entering its eighth year since its launch in 2018. Therefore, the 2026 Budget is based on four themes, namely;
a) Improving liveability to enhance the quality of life; b) Upgrading the economy to increase household income; c) Empowering the people to increase public participation; and d) Investing in the built environment to improve resilience.
Dato’ Seri Yang di-Pertua and Honourable Members, under theme (A), namely improving liveability to enhance the quality of life, the State Government focuses on four strategic initiatives, namely;
a) Addressing housing affordability and diversity issues; b) Continuously improving public safety and cleanliness; c) Improving welfare and care systems; and d) Diversifying recreational, sports, arts and cultural facilities.
The State Government has set a target of 220,000 units of Affordable Housing, RMM, which is now known as MutiaraKu Housing or RMKu, involving various categories by 2030. To achieve this target, the State Government through the State Housing Board, LPNPP, has set 17 development projects under the Development Planning Master Plan 2021 to 2030. Up to 31 October this year, the supply of RMKu units has reached 170,706 units or 77.59% to meet the high demand for RMM and to encourage the construction of RMKu in Penang. The Government through LPNPP has re-coordinated the conditions for the provision of RMKu A according to zones, while RMKu B and C become compliance options for developers.
In addition, the compliance conditions for providing low-cost and low-medium-cost housing through the Hire Purchase Scheme or Rent To Own have also been improved. Under this, the units are handed over free of charge to the State Government for developments located in Zone 2 and Zone 3 with a compliance rate of 10 per cent. The household income limit for open market applications or PN4, especially for the T20 group, is set at a maximum of RM20,000.00. This determination is in line with Department of Statistics Malaysia data which shows that households with an average income of RM18,000 a month fall within the T20 category and are not eligible to buy subsidised houses provided by the State Government. The State Government also welcomes the Federal Government’s plan to develop the People’s Residence Programme, or PRR, Kota Giam, which has been approved under Rolling Plan 3, RMK-12, with an allocation of RM55 million, and the PRR Central Seberang Perai project, which has been approved under RP5, RMK-12, with an allocation of RM30 million. The State Government is also concerned about single people and senior citizens, especially those living alone and needing urgent housing solutions. Therefore, the State Government has introduced a proposal for the rental of State Government houses and the People’s Housing Programme on a partnership basis, or, with permission, co-living space, to create equal opportunities for these groups.
Dato’ Seri Yang di-Pertua and Honourable Members. I would like to shift focus to two main pillars that are the lifeblood of a progressive and civilised city, namely public cleanliness and public safety. We are aware that the foundation of a civilised city begins with excellent cleanliness management, and more importantly, public safety is a priority that cannot be compromised. The State Government, through the Penang Island City Council and the Seberang Perai City Council, always implements continuous efforts to improve the level of public safety and cleanliness in our state.
To strengthen public safety, the State Government through the Penang2030 initiative continues to implement proactive measures through the installation of closed-circuit television, or CCTV, throughout the State of Penang. This initiative not only plays a role in preventing crime but also supports traffic monitoring and strengthens the implementation of the smart city concept towards a safer, more liveable and high-technology state. In line with the aspiration to make Penang a prosperous state by 2030, 5,000 CCTV units are targeted to be installed throughout the state. So far, 1,525 CCTV units, or 30.5% of the target, have been installed. This includes 1,137 units under MBPP and 388 units under MBSP. This effort is carried out continuously through strategic cooperation between the State Government and Local Authorities, enforcement agencies and the private sector to ensure that Penang remains a safe and liveable state.
Among them is adding high-technology CCTV units capable of recording with clear resolution and equipped with intelligent detection systems to assist the police and PBT in immediate action. Data indication with the Smart Command Centre, which enables continuous monitoring in a more efficient and integrated manner. Strategic cooperation with security agencies to improve the effectiveness of patrols and strengthen crime prevention actions. Installation of CCTV in high-risk areas such as public areas, housing estates, main roads, business areas and tourist and development locations, and the development of a smart city infrastructure system that enables CCTV to be connected with Internet of Things technology for real-time data analysis.
Apart from the main responsibilities of the Local Governments MBPP and MBSP, the State Government also attends to the pulse and current needs of the people with an inclusive approach based on community well-being. Among these initiatives are Operation Crow Sharpshooter and Operation Pigeon Purge carried out by MBSP to reduce the population of crows and pigeons, which are feared to pose a threat to the level of public cleanliness and health in the Seberang Perai area. At the same time, to address the issue of roaming animals such as cows, dogs and cats, MBPP has implemented control and placement operations for roaming or abandoned animals, including through the implementation of the Pantai Acheh Dominant Livestock Centre project and the Cat Sanctuary in Batu Feringghi.
Since 2008, recycling practices in this state have been cultivated through the Cleaner Greener Penang policy. It has been a while since we heard about Cleaner Greener Penang. The cultivation of this practice has continued to be strengthened, and based on records, the recycling rate in Penang has increased every year, namely 49.57% in 2023, 50.64% in 2024, and up to July 2025, 37.8%. As a continuous effort to strengthen recycling practices, MBPP will implement a solid waste management facility upgrading project, including the Nature Education Centre project being established at Jalan D.S. Ramanathan, which will function as an Incubator Centre for environmental conservation and learning, and become a centre of excellence in Urban Farming.
Mr Speaker and Honourable Members, in terms of welfare and health, the State Government has allocated RM83 thousand to the Health MMK Committee to implement health programmes in cooperation with the State Health Department in 2025. The State Government will continue the same commitment in 2026. Among the main programmes implemented this year is the National Health Screening Initiative programme involving 241,909 individuals up to September this year.
In addition, the wellness hub programme continues as a health well-being service through increasing knowledge and skills of healthy lifestyles. I take this opportunity to record my appreciation to the Federal Government, particularly the Ministry of Health, regarding the initiative to upgrade Penang’s health facilities. Up to 30 September, 42 upgrading, alteration and repair projects of health facilities for 2025 have been implemented with an allocation of RM8.99 million. Meanwhile, for the Fifth Rolling Plan, RMK-12, the State Health Department has been approved an allocation of RM9.4 million for two new projects, namely the upgrading of the water supply tank system at Balik Pulau Hospital at an estimated cost of RM5 million, and the upgrading of the chiller system and cooling towers at Kepala Batas Hospital at an estimated cost of RM4.4 million.
To continue the sports development agenda, the State Government has allocated a total of RM350,000.00 to the Sports MMK Committee this year. In addition, RM7 million has been allocated to the Penang State Sports Council to implement state sports programmes, and RM7 million to the Penang Stadium and Open Space Corporation. In preparation for the Malaysia Sports Festival, or SUKMA 2026, in Selangor, MSNPP is currently carrying out thorough preparations involving 37 events with a target of 60 gold medals. The State Government also continues the disbursement of operating grants of RM8 million to Penang Football Club, or Penang FC, as support for the development of state football.
Dato’ Seri Yang di-Pertua and Honourable Members, under Theme B, namely Upgrading the Economy to Increase Household Income. The State Government targets four strategic initiatives, namely to advance the readiness of local manufacturing industries for the digital era and green economy. To modernise and diversify sustainable agriculture, to create various quality tourism products throughout the Island and Seberang Perai, and to build an ecosystem that nurtures the creative industry and specialised business services. As a result of the support of the Federal Government through the commitment of an allocation of RM50 million and the grant proposed by the State Government, Penang Silicon Design @ 5km+ has begun to bear fruit. The number of integrated circuit design companies, or IC Design, operating in Penang has increased from 20 companies in 2024 to more than 45 companies in 2025. Moreover, the State Government is also proud of the achievements of two local companies, namely SkyeChip and Silicon X, which each develop high-technology chips and proprietary local chips made in Malaysia, Made by Malaysia.
To strengthen Penang’s position as a high-impact investment destination, the State Government has implemented targeted investment promotion to new and existing investors through the organisation of investment missions to major countries such as Japan and the Netherlands in 2025. This mission focuses on new companies with the potential to invest in Penang, as well as strengthening relations with existing investors who plan to expand their operations, particularly in the semiconductor industry. This effort also includes initial networking with existing supplier ASML from the Netherlands, which is now looking at opportunities to expand their production facilities to the Southeast Asia region. Through this tireless effort, we have witnessed a significant increase in approved manufacturing investment in the period January to June 2025. Penang recorded approved manufacturing investment totalling RM12.5 billion involving 86 projects, recorded by MIDA, and is estimated to create 11,116 new job opportunities. Of this total, RM10.5 billion is foreign direct investment, while RM2.0 billion is domestic direct investment.
The State Government has also implemented various preparatory measures in terms of infrastructure and the provision of a conducive space to boost the state’s economic growth. Among the main initiatives that have been and are being implemented are the development of new industrial parks equipped with world-class infrastructure, such as Bandar Cassia Technology Park, Batu Kawan Industrial Park 3 and Penang Science Park South. At the same time, the State Government remains committed to ensuring that this economic development runs in line with environmental conservation and preservation through the implementation of various programmes led by the Penang Green Council, at a cost of about RM424,000.00, including the Penang Green Data Programme, Penang Energy Study and Penang Green Industry Programme, which are expected to strengthen the state’s investment ecosystem, encourage green growth and drive Penang towards becoming a smart, sustainable and globally competitive state.
Penang is often seen as an industrial state, but many are less aware that our state also has green areas oriented towards sustainable agriculture. The State Government, through the State Agriculture Department, has implemented various initiatives by utilising Agrotechnology to increase the yield and quality of agricultural products. As a result, the state’s paddy production in 2023 reached 122,345 metric tonnes with a value of RM183.5 million. Meanwhile, in 2024, 116,402 metric tonnes with a value of RM174.6 million were recorded. Recently, the State Government has established cooperation with Fujian Agriculture and Forestry University, a leading agricultural research institution in Fujian Province, China, to explore ratoon rice cultivation technology, or, with permission, “ratoon rice”. This method allows paddy to be harvested twice from a single planting. If this technology succeeds, it will open a new chapter in the country’s paddy industry. Therefore, Penang is ready to be the pioneer in implementing this technology.
In addition, fruit production in 2023 recorded 33,560 metric tonnes valued at RM335.6 million, while 29,388 metric tonnes valued at RM293.9 million were recorded in 2024. Vegetable yield recorded 10,936 metric tonnes valued at RM32.8 million in 2023. 7,158 metric tonnes valued at RM21.5 million were recorded in 2024. According to the interim findings of the Penang Agriculture Census 2024, the livestock sector emerged as the largest contributor to the total value of agricultural sales in the State of Penang, namely 44% with a total of RM3.514 billion. Meanwhile, for the aspect of farm production, the value of livestock output has maintained earnings exceeding one billion ringgit every year since 2019. In 2024, the value of livestock output showed an increase totalling RM41.54 million, recording RM1.91 billion compared with RM1.86 billion in the previous year. This increase was driven by rising market prices, especially for chicken, duck and pig commodities, as well as increased production of dominant livestock. The State Government, through the Veterinary Services Department, implements the State Livestock Enactment involving independent livestock industries such as poultry and pigs to encourage the transformation of livestock farming in a modern manner, or, with permission, modern farming. The use of enclosed pens and coops, or closed house, is made one of the criteria for modern livestock farming to support this commitment. The State Government will provide an allocation of RM4.25 million for 2026.
Penang also contributes to the national aquaculture output, recording a value of RM866 million in 2024. The capture fisheries sector is also no less impressive, because in 2024, 39,441 metric tonnes were recorded as inland and marine fish landings. Since 2024, the State Government has received an allocation of RM350,000.00 for a joint project between the Ministry of Agriculture and Food Security and the State Government for the programme of releasing fish fry into inland waters. Through this programme, 1.35 million juveniles of giant freshwater prawn, baung fish and river lampam fish have been released into river waters. In 2025, this programme was further intensified with the approval of an allocation of RM880,000.00, involving releases into marine waters in addition to inland waters. In addition, the State Fisheries Department always cooperates with the State Government to increase investment and the presence of foreign national tuna vessels for tuna landings in our state. Uniquely, based on 2025 data, Penang is the only state in Malaysia that has issued tuna vessel licences for 32 local C3 vessels that go out to catch tuna in the Indian Ocean using longline equipment for 2 to 3 months and return to ports in Penang for landing.
Up to now, there are four foreign vessels from abroad that have landed their fish this year before being exported overseas. Last year, a total of 431 metric tonnes of tuna were landed and are expected to increase in 2025 and 2026. Moreover, the signing of the Memorandum of Agreement, MoA, between Asia Ocean Resources Sdn. Bhd. and Penang Port Sdn. Bhd., which took place on 16 September last, will transform Penang Port from providing conventional cargo services into a strategic gateway for the high-value seafood supply chain, thereby enhancing its position in the international fisheries industry. This confidence is in line with the approval of RP1 for 2026 RMKe-13 regarding the Tuna Port Development Study in Penang, which I mentioned earlier.
Dato’ Seri Yang di-Pertua and Honourable Members, Penang continues to strengthen its position as a quality tourist destination in the region. Up to the first quarter of this year, Penang received 2.1 million hotel guests, an increase of 10.2% compared with the same period in 2024. For the period January to August this year, Penang International Airport recorded 5.2 million passenger movements, an increase of 5.98% compared with the same period in 2024. In line with Visit Malaysia Year 2026 and the increase in direct flights to Penang, the State Government is confident that the state’s tourism sector will become more vibrant in the coming year. Since 2023 to 2025, a total of 372 tourism and creative economy programmes, products or projects have been implemented with total expenditure exceeding RM21.0 million. Support for the tourism and creative economy industry will continue in 2026. Among them, the improvement of the Guar Kepah Archaeological Gallery in SPU as a result of cooperation with the Northern Corridor Economic Region, as well as the opening of the Lin Xiang Xiong Art Gallery as a new cultural landmark at Pesiaran at The Light, which nurtures the spirit of creativity. It will become a meeting space between art, education and tourism, thereby strengthening Penang’s position as a creative hub and a world-class heritage destination.
The State Government will support the implementation of 100 tourism and creative economy programmes with a projected cost of RM7.0 million in 2026. The main focus is to ensure that every initiative carried out brings high added value in line with the goal of strengthening a resilient tourism and creative industry ecosystem. Penang also recorded 2,059 business events in 2024, an increase of 240% compared with 604 business events in 2023. For the period up to August this year, 1,183 events have been held in Penang with a projected economic impact exceeding RM800 million. This places the state as a major convention hub in Malaysia. In 2025, Penang, through the Penang Convention and Exhibition Bureau, PICEB, is intensifying the promotion of a new segment, namely exhibition events, or, with permission, Exhibition, through the opening of the Penang Waterfront Convention Centre, PWCC, starting October this year. Through the memorandum of understanding signed between PICEB and KINTEX Korea, more exhibition events will be held in Penang in the coming year.
Dato’ Seri Yang di-Pertua and Honourable Members, further under theme C, namely Empowering the People to Increase Public Participation, the State Government places emphasis on four strategic initiatives, namely helping vulnerable communities and reducing inequality, increasing the participation of youth, women and senior citizens in community life. Creating more platforms for public involvement in social development, and accelerating the delivery of programmes and institutional reform. In line with theme C1 under the framework of the Penang2030 Vision.
The State Government, through the MMK Committee on Education and Higher Education, remains committed to upholding the state’s educational institutions as progressive, inclusive and world-class education hubs. This effort reflects the State Government’s determination to produce a generation that is knowledgeable, skilled and of noble character, capable of becoming a catalyst for the state’s progress.
Since 2023, a sum of RM826,000.00 has been allocated under this committee to implement various initiatives, including education digitalisation programmes such as the provision of smartboards, and the implementation of programmes to address learning dropouts and to strengthen literacy and numeracy 3M, throughout the State of Penang. The i-Sejahtera programme is proof of the State Government’s seriousness in caring for vulnerable groups and appreciating the contributions of the people of this state. In 2024, the State Government distributed a total of RM56.24 million, including funeral management assistance, to 286,335 recipients under the Senior Citizens Programme. Up to 31 October 2025, the State Government has spent a total of RM53.57 million involving 287,923 recipients; the number of senior citizen recipients will increase every year. Who will be eligible this year? I have been eligible for a long time. Air Tawar Telok Ayer Tawar has always increased every year. In addition, as a state that cares for welfare, the State Government intends to continue the i-Sejahtera programme in 2026 with an estimated allocation of RM65 million to ensure that no group is marginalised or pushed to the sidelines. To strengthen the role of the Penang Youth Committee, JBPP, the State Government has allocated a total of RM1.39 million in 2025 for the payment of allowances and the implementation of youth development programmes.
For next year, the Penang Youth Development Corporation (PYDC) together with the Penang Youth Committee will continue to strengthen the implementation of this initiative with a target of 40,000 youths participating by 2027, in line with the State Government’s aspiration to produce a young generation that is competitive, visionary and has leadership spirit. It is well known that the Women and Family Development Committee (JPWK), established by the State Government through the Penang Women’s Development Corporation, PWDC, is the only official structure under the State Government in Malaysia with a membership of 15 women in each state constituency. The total number of JPWK in Penang has now reached 600 people.
Regarding the aging state, the State Government is aware of the statistics from the Department of Statistics Malaysia which show that in 2024, 8% of Penang’s population was aged 65 years and above, thus placing Penang among the aging states in the country. Therefore, the State Government, through MBPP, has launched the Age Friendly City Initiative. This initiative will be expanded to the Seberang Perai area starting this year, where a sum of RM403,800.00 has been allocated for its implementation, and it will be disbursed in phases from 2025 to 2028.
The State Government remains committed to creating more platforms or spaces for public participation involving social development through the implementation of the Gender Inclusiveness Policy, or DKG, which is now entering its second phase of implementation under the DKG 2019 to 2030 direction. This policy is driven to ensure that the principle of gender equality is integrated into all planning and implementation policies at state and PBT levels. Among the core pillars of the implementation of this policy is the Gender Responsive and People’s Participatory Budget, GRPB, which emphasises the active involvement of the people in the budget planning process so that it is more oriented towards the actual needs of the community through the implementation of GRPB, various workshops, dialogue sessions and people’s budget engagement programmes have been conducted to encourage community participation in the budget framework at the Local Government level. Penang is now a pioneer in this approach, and the GRPB model implemented in this state has been recognised as best practice in Malaysia and is referred to by agencies and PBTs from other states. This effort not only strengthens the state’s inclusive policy but also demonstrates Penang’s leadership in encouraging the people as partners in sustainable socio-economic development.
Through the commitment to realise the Penang2030 Vision by creating a safe environment for all, the State Government through PWDC remains committed to addressing gender inequality and family violence through the implementation of the Safe Family Policy, or DKS, since five years ago. This policy has successfully trained 2,086 individuals and 536 First Support Points comprising various Government Agencies, Non-Governmental Organisations and communities, and even 69 Police personnel have been trained to improve the competence of frontline personnel in handling domestic violence cases. More impressively, through PWDC’s cooperation with the Geospatial Information Management Unit, PEGIS, our efforts have produced the mobile application
Penang Stops Violence to help victims identify the nearest First Support Point, and the application has received international recognition by winning the Geospatial World Excellence Award 2023 and The World Summit on the Information Society Prizes 2025.
In addition, public awareness campaigns such as Penang Goes Orange, which is now entering its twelfth year, play an important role as a pillar in building a safe and sustainable community. Since the 2023 State Election, the State Government has continued to intensify institutional reform efforts and remains committed to strengthening the development of Islam through the Islamic Development Agenda 2030, which is based on five core pillars, namely Socio-Economic Development, Educational Development, Family Development, Youth Development, and Da’wah and Tarbiyah Development. In strengthening the people’s well-being through balanced development between physical and spiritual progress, one of the priorities given attention is the effort to develop mosques throughout the state to meet the needs of Muslims for conducive and safe worship facilities.
The development of mosques is implemented through an annual financial allocation for maintenance assistance, infrastructure development, as well as support for da’wah and educational activities in mosques throughout the state. This commitment is demonstrated through allocations and expenditure for every mosque and surau construction and renovation project in Penang for the period 2023 to 2025.
This year, five mosques have been completed, namely Masjid Papan, Masjid Taman Sungai Dua Utama, Masjid Bandar Cassia, Masjid Sungai Kecil Nibong Tebal and Masjid Mengkuang Titi, with a total State Government commitment of RM9.8 million. In addition, Masjid Bandar Putra Bertam is also expected to be completed this year with an allocation of RM2 million, while three other mosques are under construction and are expected to be completed in 2026 and 2027. They are Masjid Lama Sungai Bakap with a total allocation of RM6 million, Masjid Cherok Tok Kun Bawah at RM4.5 million, and Masjid Permatang Tinggi at RM3.5 million. The State Government also plans to develop a City Mosque at the Smart City Campus site of the Penang International Islamic Technology College (KITAB) in Bandar Cassia, Batu Kawan.
This year, the Penang State Public Works Department is carrying out preliminary works covering land investigation and surveying, as well as the preparation of mosque designs. In 2025, the main focus is also given to the development of People’s Religious Schools, SAR. The entire construction cost is fully borne by the State Government, involving two SARs that will be completed, namely in Cherok Tok Kun, SPT, with an expenditure of RM3.85 million, and in North Seberang Perai, namely in Telok Ayer Tawar, RM4.01 million. Meanwhile, three other SARs are under construction, namely in Kampung Selamat, SPU, in Taman Berjaya Nibong Tebal, SPS, and at Masjid Bandar Baharu Ayer Itam in the North East District. The total allocation for these three related projects is RM15.07 million.
As a harmonious state that also celebrates religious diversity, various major festivals, places of worship exploration programmes and inter-faith dialogue sessions have been held continuously. In addition, the Penang Harmoni celebration and the introduction of a new Streets of Harmony in Bukit Mertajam have also been implemented. Meanwhile, another new Streets of Harmony has been introduced in Bayan Baharu. Overall, the State Government has allocated at least RM5 million to support programmes and infrastructure projects for Non-Islamic Places of Worship in Penang, excluding allocations under the Non-Islamic Affairs MMK Committee totalling RM150 thousand and the RIBI Trust Account. Up to September 2025, a total of 77 non-Islamic places of worship, RIBI, have received contributions from the State Government for carrying out programmes and upgrading projects.
Dato’ Seri Yang di-Pertua and Honourable Members, under theme (D), namely Investing in the Built Environment to Improve Resilience, the State Government focuses on four strategic initiatives, namely balancing development through effective space planning, strengthening mobility, connectivity and digital infrastructure, integrating municipal services with smart technology, and implementing climate change adaptation plans. Penang will continue to advance development with an approach that is resilient to global challenges, especially the issue of climate change which now threatens the state with floods, droughts and marine ecological stress.
Hence, the State Government has set the direction of development towards a Resilience City through strategic planning initiatives and innovative infrastructure projects. Key efforts such as the Penang Nature-Based Climate Adaptation Programme, urban agriculture, large-scale tree planting, including strategic developments such as Silicon Island, will ensure that Penang moves towards a more sustainable and agile environment in line with the Penang2030 Vision. To realise this aspiration, the State Government, through PLANMalaysia, will continue to be committed as the leader in urban and rural planning by strengthening governance and the development legal framework. The State Government has achieved significant progress with the approval of eight new planning guidelines by the State Planning Committee up to July 2025, including the Managed Industrial Park guidelines and Micromobility Vehicle Routes.
In addition, the review of key planning documents is being actively carried out, covering the Penang State Structure Plan 2040 Review and the preparation of Local Plans and Special Area Plans. The State Structure Plan 2040 will take into account the latest planning policies and coordinate high-impact projects such as the Penang International Airport and the Silicon Island project. I would also like to present the progress achieved in the state's strategic development project, namely the Silicon Island Development. The Silicon Island development, covering 2,300 acres, continues to make encouraging progress. Reclamation works that began in September 2023 have covered an area of 250 acres up to the end of October this year. The land that has been reclaimed is now being compacted so that the site can be sold in accordance with the approved Development Progress Plan. The project is being implemented in two phases, with Phase 1 covering an area of 1,260 acres and expected to be completed in 2030, followed by Phase 2 covering 1,300 acres. For Phase 1, the critical sites scheduled for completion by the end of this year and the first quarter of 2026 include the Mutiara Line LRT Depot site that needs to be built on Silicon Island. Firstly, the Indah Water Konsortium sewage treatment plant site measuring 16 acres, and thirdly, part of the Green Tech Park industrial area measuring 100 acres. These are priority projects that must be completed within the period I have just stated. Meanwhile, other strategic sites such as the affordable housing site measuring 21 acres, the mosque site, the Heart of The Island area and the State Government Administrative Centre site will be fully completed between the fourth quarter of 2026 and 2030. To ensure the smooth progress of infrastructure works, the construction of a temporary bridge linking South Penang Island with Silicon Island has been fully completed. In addition, the construction of the permanent bridge together with the main access road to Silicon Island, namely
Pan Island Link 2A, Phase 1 with a length of 1.5 kilometres at a cost of RM389 million, has been commenced.
At the same time, the construction of the IWK Sewage Treatment Plant has received approval and is expected to commence no later than the first quarter of 2026. Regarding the State Government's commitment to the use of public transport among the people of this state, bus services are one of the public transport services that the State Government places great emphasis on. Among the main programmes being continued are the two free bus routes of the CAT Bridge service, the four BEST KOMTAR routes, the Central Area Transit (CAT) bus service in George Town, while the addition of a new route, namely CAT Hospital, will begin operations starting 1 January 2026. The State Government will also once again continue the funding of the Pas Mutiara next year, making all public bus routes, including Rapid On-Demand, free in Penang through the use of the Pas Mutiara.
Overall, this year a total of RM12.3 million has been allocated as State Government subsidies in the public transport sector. The State Government is also very committed to the Social Impact Management Plan (SIMP) and is pleased to report that the promises made to the fishing community have been kept and, indeed, are being implemented continuously. As promised, ex-gratia cash payments totalling RM11.9 million have been disbursed to 795 eligible fishermen from Tier 1 and Tier 2. The State Government also wishes to emphasise that the new boat assistance, measuring 27 feet in length and fully equipped with engines and fishing equipment, has been fully delivered to 77 fishermen from the Permatang Tepi Laut Unit. The delivery of boats for the remaining 3 units, namely Sungai Batu, Teluk Kumbar and Gertak Sanggul, is being carried out and is expected to be fully completed in the first quarter of 2027. As the State Government that is responsible, all nine affected fishing units have received ex-gratia assistance, while all four eligible fishing units from Tier 1 will receive boats and engines together with fishing equipment, even though the State Government is now only reclaiming one island as compared to the earlier plan involving three islands.
Although two islands have been reduced, the SIMP as first promised is still running in full. In the meantime, 14 out of 61 fishing sheds valued at RM1.039 million have been handed over to the fishermen of the Kampung Binjai area. These sheds
are built with a stronger structure together with boat mooring facilities. The handover of the remaining sheds, involving an estimated cost of RM4.22 million, to the fishermen of Permatang Tepi Laut and Kampung Binjai will be completed in phases by 2027. In an effort to improve facilities for the local community, a new replacement village activity centre building in Permatang Tepi Laut, at a cost of RM900 thousand, has been completed and handed over. This facility will be used by the Department of Community Development (KEMAS), Penang, as a kindergarten, digital services centre and sewing classes. In addition, the final planning work is being carried out to build the Matang Food Court in Permatang Tepi Laut, and this facility includes, among others, 10 business stalls including restaurants, an MPKK hall and a recreational area. For your information, in the same area, the entire construction works for the Matang Food Court facility, the suction tank and pump house for the provision of temporary water supply to Silicon Island as stipulated by PBA, together with land works in Permatang Tepi Laut will involve a total estimated cost of RM36 million.
Dato' Seri Yang di-Pertua and Honourable Members, regarding the State Government's Digital Transformation agenda, the commitment continues through the upgrading of the Geographic Information System, GIS, and SMARTPLAN under Penang GeoHub, which now comprises 18 modules including SMART Industry and SMART Penang Bay, to formulate more robust planning policies. In addition, the Penang State Smart City BluePrint is being prepared to replace the previous document and to apply Smart City components to improve the quality of life of economic organisations and a sustainable environment by 2030. The State Government has also launched the Penang State Industrial Master Plan 2030, demonstrating its commitment to upgrading the value chain of the industrial sector and strengthening Penang's position as a preferred investment destination in the region. Meanwhile, the Creative Digital District is an area centred on Gat Lebuh China, established to revitalise the core area of the Penang city and to form an innovation district based on digital technology and the creative industry. In 2022, this 114-acre area has grown rapidly with the presence of various institutions and companies, including the Faculty of Digital Technology, Wawasan Open University, Digital Penang, 42Penang, Finexus, Penang Science Cluster, Rekayu, Think City Sdn. Bhd., MDEC, the Northern Zone Office, and TS Cloud Sdn. Bhd. The implementation of the Creative District is also strengthened through various digitalisation development programmes for micro, small and medium enterprises entrepreneurs, PMKS, technical workshops and collaborative initiatives between Government Agencies and the private sector to
strengthen the capacity of technology companies, beginning with local ones. This initiative continues to grow dynamically with the participation of the digital creative community and technology to create a sustainable and competitive innovation ecosystem, and subsequently benefit start-up technology companies, PMKS, digital companies and the people of Penang as a whole.
The State Government, through Digital Penang, has developed the Digital Economy Master Plan, or DEMP, 2025, 2030 to form a connected, creative and competitive society, while supporting the state's strategic agenda, especially in positioning Penang as the IC Design Hub in Southeast Asia. The effectiveness of DEMP is determined by several key indicators as follows: firstly, increasing the contribution of Penang's GDP from RM116 billion in 2023 to RM156 billion by 2030.
Secondly, increasing the contribution of the digital economy to 35% of Penang's GDP by 2030. Thirdly, attracting digital investment of up to RM20 billion and investment in advanced semiconductor manufacturing of up to RM13 billion by 2030. And fourthly, increasing the median household income of Penang by approximately 17% to 7,700 by 2030.
Fifthly, creating 50,000 new digital job opportunities and increasing the skills of the workforce by 30%. And sixthly, reducing energy intensity by 25% and increasing the use of renewable energy to 10%. To strengthen digital mobility and infrastructure, the Penang Internet Exchange, or PIX, has been established to increase internet data speeds and the quality of digital connectivity. For 2026, the State Government, through Digital Penang, will focus on nurturing digital talent and innovation, including through certification, testing, software, and in addition, emphasis is also placed on strengthening cyber security and data privacy through the Penang Internet Exchange initiative, with a projected cost of RM300 thousand.
The State Government supports the efforts of MBPP to integrate municipal services through smart technology in 2026. Among the initiatives to be implemented are 3D Heritage Building Mapping, Weather Station and the use of Geotech Lidar Technology.
In addition, to ensure the advancement of smart technology can be optimised fully, the State Government also encourages the adoption of smart technology among start-ups and SMEs. A total of RM560,318.00 has been spent from 2023 to October 2025, covering digital literacy programmes, technology inclusiveness and community involvement in the digital transformation agenda. Additionally, Digital Penang has also introduced the PANTAU application, which is a real-time location tracking system or, with permission, real time location tracking, for public use, especially during the celebration of major festivals in our state. To date, this application has been utilised by more than 20,000 users. Meanwhile, efforts to enhance cyber security among KADUN members through the MyKADUN initiative continue and have now recorded more than 20,000 customers.
By 2026, a total of RM790,000 will be allocated for the implementation of the Digital Penang initiative to ensure comprehensive and inclusive dissemination of technology among residents of this state.
As a coastal state that constantly faces the challenges of climate change, the State Government remains committed to strengthening the resilience and sustainability of the city. The State Government continues to prioritise the comprehensive implementation of climate change adaptation planning, in line with Teras 5 of the Penang State Structure Plan and the Penang2030 Vision. This initiative includes the conservation of environmentally sensitive areas, control of development in highland areas, and the strengthening of land use policies based on the Resilient City concept.
Through the Nature Based Climate Adaptation Programme, the State Government is implementing an approach based on Nature Based Solutions, focusing on urban greening, reduction of heat impact and the creation of a more sustainable and liveable environment, especially at the UNESCO World Heritage Site, George Town. This initiative not only helps to reduce environmental temperatures and mitigate the risk of flash floods, but also indirectly improves the overall quality of life of the people. In line with this commitment, the State Government through MBPP will implement various initiatives under the Nature Based Climate Adaptation Programme as a new benchmark in the transformation of public spaces and to position Penang as an innovative and inclusive pioneer in climate adaptation in Malaysia.
To strengthen the state's drainage infrastructure, water resource management and infrastructure are also being upgraded through the implementation of flood mitigation programmes, the use of the Manual Saliran Mesra Alam, or MSMA, as well as measures to protect coastal areas from rising sea levels. This continuous effort reflects the State Government's commitment to protecting the well-being of the people and ensuring that Penang remains sustainable and resilient for future generations.
Through an allocation from the State Government totalling RM6 million, the implementation of the Sungai Sanglang Flood Mitigation Project, Phase 1, will help in upgrading the drainage system, culverts and pump houses in phases. This project is expected to reduce the risk of flooding in the Sanglang area and its surroundings.
The State Government has also approved an allocation totalling RM5.1 million under the High Impact Flood Mitigation Project for the extension of the Sungai Permatang Rawa Flood Mitigation Project, which involves river conservation works, the construction of crossings and outfall structures to reduce the risk and impact of flooding in high-risk areas. In line with this, the State Government has also launched the State Disaster Command Centre as an integrated control centre to consolidate disaster information between the National Disaster Management Agency (NADMA) and state agencies. This integration not only strengthens preparedness levels and improves disaster response, but also ensures that disaster management coordination and the delivery of assistance to the people can be carried out more quickly, orderly and effectively.
Dato' Seri Yang di-Pertua and Honourable Members, with effect from 1 January 2025, the State Government adopted the new recruitment policy for civil servants through Interim Contract Appointment (LKI), in line with the policy of the Federal Government. For your information, the period of LKI is three years or until the new method of permanent appointment takes effect, whichever is earlier.
As this LKI appointment is a contract appointment, the current procedure stipulates that LKI officers and Contract of Service holders are only entitled to 15 days of full-pay sick leave per year. Officers who require an additional period must apply for permission to be absent from duty on medical grounds, for which no emoluments are paid for the period concerned.
Therefore, the State Government has introduced a contract sick leave assistance initiative as an additional welfare measure to ensure that they continue to receive proper protection when facing serious health problems. Through the implementation of this initiative, LKI officers and Contract of Service holders who are confirmed as unable to work due to health reasons and who meet the stipulated eligibility requirements may be considered for an assistance payment, at a payment rate together with the current emoluments of the officer on leave. This initiative reflects the concern and commitment of the state towards the welfare of contract appointment officers, while also expressing the principles of good governance based on well-being, empathy and social justice in the human resource management of the state public sector.
In addition, with the implementation of the Public Service Remuneration System, SSPA, which took effect from 1 December 2024, it is hoped that civil servants throughout the State of Penang will be more committed to fulfilling the aspirations of the state. In line with the hopes of the Honourable Prime Minister expressed during the 20th Public Service Premier Advisory Council Meeting on 15 August last, this improvement must be followed by the spirit of "Perkhidmatan Awam MADANI Teras Kecemerlangan".
I would like to inform this August House that, as of this morning, 14 November 2025, the State Government has recorded revenue collection, namely the estimate tabled last year, amounting to RM920.15 million. This collection has exceeded the 2025 target of RM906.59 million, thereby placing the State Government on the right track to increase the accumulated balance of the Consolidated Revenue Account. With the continued commitment of the State Public Service Members, the State Government is optimistic of achieving total revenue collection exceeding RM1 billion before the closing of the final accounts this year, as was last achieved in 2016, when the State Government at that time recorded revenue collection totalling RM1.029 billion.
So, (interruption) as appreciation. I said this morning that Johor having it does not necessarily mean Penang has it. (interruption) For all 3,954 State Public Service Members, I am pleased to announce a Special Financial Assistance, BKK, of 0.75 months' salary (interruption) with a minimum payment of RM1,000.00, it's means quarter month, three quarter month. In addition, supervisors, Al-Quran Class teachers and KAFA teachers, SRAR teachers, SMAR teachers, SRAR, SMAR and SABK staff, tahfiz teachers, pondok teachers, Islamic Kindergarten teachers as well as
teachers and staff of private Chinese schools in the State of Penang, totalling 3,358 persons, will also be given an allowance of RM300 each on a one-off basis. With this pleasant announcement, it involves a financial implication of RM11.49 million, just imagine if it were two months, three months. Where is the State Financial Officer? Dato' Seri Yang di-Pertua and all respected Members of this House, before closing the State Budget for today, allow me to emphasise once again that every figure and allocation presented today is not merely a fiscal matter but a promise and a trust. A trust to ensure every family enjoys well-being, every young person gets opportunities, and every resident of this state experiences the fruits of balanced development. This Budget is the lifeblood of our journey towards the Penang2030 Vision, a state that is not only advanced and prosperous but also resilient, family-oriented and grounded in the values of Malaysia Madani. We want to build a Penang that is not merely pleasing to the eye but also prosperous to live in.
Concluding the presentation of the Penang State Budget for the Year 2026 this afternoon, let us together renew our resolve to continue serving with trust and dedication. With the spirit of togetherness, let us join hands so that every policy and initiative planned can truly give meaning to the lives of the people in every corner of the state. Armed with the spirit of "Untuk Negeri Kita", I am confident that Penang will continue to prosper and be on the right track to achieve the Penang2030 Vision by 2030.
Woven with resolve in this blessed land, Together with the people we struggle, This Budget is a promise of trust, Building the state, prosperous and glorious.
The morning dew greets the earth, Nourishing hope in the conscience of the heart. With the harmonious spirit of Penang2030, We uphold the concept of Malaysia Madani.
The sky is bright as a sign of a new beginning, The rising sun brings meaning, Together with the people, the government and leadership, We carve out a sustainable future.
That concludes my speech. Dato' Seri Yang di-Pertua, I respectfully move the motion.
Thank you, the Honourable Chief Minister.
Mr Speaker, I beg to second.
Terima kasih.
Motion on the Development Estimates for 2026 by the Honourable Chief Minister.
Sila.
Dato' Seri Mr Speaker, I beg to propose that this House approves the expenditure of RM318,622,100.00 only as stated in the Development Estimates for 2026 tabled as State Legislative Assembly Paper Number 4 of 2025, and determines that the said sum
Supply Bill 2026 and Development Estimates Motion 2026. House AdjournedBill
shall be used for the purposes specified in the Development Estimates for 2026.
Dato' Seri Mr Speaker, I beg to second.
Thank you. The Honourable Members' debate session on the Appropriation Bill 2026 and the Motion on the Development Estimates for 2026 will begin on Monday, 17 November 2025. Honourable Members, the House is adjourned and will reconvene on 17 November 2025 at 9.30 a.m. That is all.
The House was adjourned at 4:50 p.m.