Perak · 10 September 2026

15th Assembly, 4th session, 2nd meeting · 176 turns · 13,799 words · official PDF ↗ · Digital Hansard ↗

135 of 176 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPerak publishes one PDF per sitting day, from May 2020 (none for 2018-19), and a file of oral and written answers per meeting from December 2022.

(Opening)

HeraldEN

Honourable Members. Deputy Speaker.

SecretaryEN

Peace be upon you, the mercy and blessings of Allah, and greetings of wellbeing. Honourable Members all, we now begin the Third Sitting, Second Meeting, Fourth Year, of the Fifteenth Perak Darul Ridzuan State Legislative Assembly, on Thursday, 10 September 2026 at 9.09 a.m., with the first item of business, the recitation of prayers.

ALL praise is due to Allah, blessings and peace upon His Messenger. In the name of Allah, the Most Merciful, the Most Compassionate, this State Legislative Assembly is hereby opened.

O Allah, Who possesses infinite wisdom and abundant justice, Who bears the obligation over the Ruler and the Members of the Executive Council to govern the affairs of society, may there be peace, prosperity and abundant happiness, encompassing all the people of the State of Perak Darul Ridzuan.

O Allah, we are Your servants who have been permitted to become Members of the State Legislative Assembly, to fulfil the duties entrusted to us, above all for the State of Perak Darul Ridzuan and all its people.

O Allah, we gather before You and ask for Your blessing. We ask that Your guidance illuminate and direct us as we deliberate, consider and exchange views on all matters presented, with diligence and trustworthiness, upholding Your commands and majesty, so that there may be greater security, prosperity and wellbeing for the State of Perak Darul Ridzuan and all its people.

O Allah, we ask that our prayers be granted. Amen. O Allah, Lord of all the worlds.

The second item, announcements by the Speaker.

Deputy SpeakerEN

The Most Honourable Menteri Besar, Members of the State Executive Council, Honourable Members of the State Legislative Assembly, the secretariat, and all media personnel, before we proceed with the next business of the meeting, may I be permitted to make several announcements.

The first item: as is customary in the order of business of the meeting, the Order Paper and oral questions may be downloaded by scanning the QR code on the table in front of each of you. In addition, Honourable Members and heads of department are also required to register attendance using the same QR code. The second item concerns the official Hansard. I wish to inform Honourable Members that they may read and download the official Hansard of each sitting no later than 12.00 midnight. Thank you.

Questions That Have Been Given Notice, Oral QuestionsQuestions

SecretaryEN

The third item, questions for which notice has been given, oral questions.

Deputy SpeakerEN

For the information of Honourable Members, the time allocated for the oral question session today is 1 hour 30 minutes. Supplementary questions are limited to 2 questions only, and they must be related to the original question. Supplementary questions that are not related to the original question are not permitted. I now invite the Honourable Member for Pengkalan Baharu to put forward a question. Please.

Datuk Azman bin NohUMNO · BNPengkalan BaharuEN

Thank you, Deputy Speaker. My question is question number one.

Dato’ Seri Saarani bin MohamadUMNO · BNMenteri Besar · Kota TampanEN

Thank you, Madam Deputy Speaker. Peace be upon you, Assalamualaikum Warahmatullahi Wabarakatuh, greetings of wellbeing. The Honourable Member for Pengkalan Hulu asks a question regarding the process of registering a surau. For the information of the Honourable Member, an application to register a surau may only be made to the Perak State Islamic Religious Department (JAIPk) if the building site to be used as a mosque or surau has been made a permanent waqf. Therefore, the surau committee members must first deal with the Perak Islamic Religious and Malay Customs Council (MAIPk) to arrange the waqf of the building site. The Land and Mines Office (PTG) has made improvements to the process concerning the needs of the district and land offices to submit survey requests to the Department of Survey and Mapping Malaysia (JUPEM) for the preparation of gazette plans for the approved reservation plan, and for state authorities that already have an endorsed plan (PA) and have been allocated a lot number by the Surveyor-General, survey requests no longer need to be submitted to JUPEM. Instead, the district and land office only needs to notify JUPEM for recording once the gazetting and revocation of gazette processes are completed.

Based on JUPEM Perak records from 2021 to 2026, a total of 687 survey requests (PU) have been received from district land offices across the State of Perak for sites involving the Perak Islamic Religious and Malay Customs Council. The breakdown of the status of these survey requests is as follows. A total of 386, or 56%, of all survey requests have been completed and the gazette plans have been sent to the Perak State District and Land Office. A total of 228, or 33%, of all survey requests have completed preparation of the draft gazette plan and are still awaiting verification from the Perak State District and Land Office. A total of 73, or 11%, of all survey requests are still in the process of preparing the draft gazette by the Perak State Survey and Mapping Department. To that end, the eKadaster system has been fully utilised for all survey requests received from district and land offices in order to expedite the preparation of gazette plans. Thank you.

Deputy Speaker

Soalan tambahan.

Datuk Azman bin NohUMNO · BNPengkalan BaharuEN

Thank you, the Honourable Member for Kota Tampan, for the explanation regarding the question I raised. Before that, I also wish to record my thanks in particular to MAIPk, JAIPk, Yayasan Perak and other agencies for the process of sending our students to the Middle East recently. Yes, they have done a great deal of help for our children. In this supplementary question, I also wish to raise matters relating to applications that have been delayed for a long time in obtaining registration certificates. When we refer to them, most of these cases are stuck, possibly on the side of the land administrators, yes. But is there a mechanism or step that we can take so that these processes can be expedited? Let it not be that we have to wait for more than 4 or 5 years to obtain a registration certificate. Thank you.

Dato’ Seri Saarani bin MohamadUMNO · BNMenteri Besar · Kota TampanEN

Thank you. Deputy Speaker, I understand what the Honourable Member for Pengkalan Baharu intends, namely that any surau or mosque that does not obtain a waqf registration certificate will not receive assistance from the State Government, because the condition for the State Government to provide any form of assistance is that it must be based on valid registration from MAIPk. Therefore, as mentioned earlier, there are several applications for such registration that may perhaps be stuck at some stage, whether at the land office or at JUPEM, and we will look into them. If there are matters that may have been overlooked, we will try to improve them. Thank you.

Deputy SpeakerEN

Gunong Semanggol, please.

Tuan Haji Razman bin ZakariaPAS · PNGunong SemanggolEN

Yes. Thank you, Deputy Speaker, and thank you, the Most Honourable Member. There is a small question. We know that in every process there is a customer charter setting out the time period taken to complete each process. So, many of the applications from the start, regarding the purpose for which the land is to be made waqf, involve titles, involve whatever land status is brought to the district office. One point I wish to ask is what time period is taken according to this customer charter, first of all. Secondly, perhaps we want to go a little into this matter: we have, for example, lost titles. Sometimes the land title is lost. Yet for a lost land title, the process of transferring the name, which is a common matter, takes the land office more than 6 months. So, that is all, even though the documents are already at the land office. Why does it need up to 6 months, sometimes 6 months and even more than that? So, my question concerns the time period for the gazetting process of surau land: if possible, may a customer charter period be provided that can serve as a benchmark. If we say 6 months, then after those 6 months there must be an answer, there must be a reciprocal response, so that it does not drag on and on until we do not know the answer. I seek an explanation from the Most Honourable Member.

Dato’ Seri Saarani bin MohamadUMNO · BNMenteri Besar · Kota TampanEN

Thank you, Deputy Speaker. The Honourable Member for Semanggol, and Honourable Members, I also understand what the Honourable Member for Semanggol means. Yes, as usual, all departments should have a customer charter, namely a promise regarding the period of time for any applicant's application, so there is a period within which the department must resolve the matter. I do not have anything in writing regarding a customer charter for JUPEM and so on, nor MAIPk, but I will reply to the Honourable Member for Semanggol in writing. Just to share some experience. Sometimes this delay occurs because additional documents are required, including, if we know that for a particular title there is more than one name, the process of obtaining confirmation from every person named on a single title usually takes time. Sometimes some of them have passed away, and their heirs must be found, and some have not yet had a court hearing on authority, and this is a process that is rather slow. Honourable Member, if there are matters that are very specific, please inform me so that I can prepare reference material, and we will refer back to the relevant departments. Thank you.

Deputy SpeakerEN

I now invite the Honourable Member for Simpang Pulai to put forward a question. Please.

Cik Wong Chai YiPKR · PHSimpang PulaiEN

Greetings of wellbeing and good morning. Simpang Pulai Question No. 2. Thank you.

Thank you, Honourable Deputy Speaker. Thank you to the Honourable Member for Simpang Pulai, who has raised a question about gated and guarded communities, with permission. First and foremost, I wish to clarify a confusion that often arises among the public. We commonly mention the term "gated and guarded" as if it were one and the same concept. In fact, from the perspective of planning and law, gated and guarded are two different concepts. Based on the PLANMalaysia planning guidelines, a gated community refers to a Strata Community Housing Scheme. For example, condominiums, which are indeed planned from the outset as areas with fencing and entry-exit control, while the areas and shared facilities within them are managed as common property. Meanwhile, a Guarded Community Scheme usually involves an ordinary housing estate with individually owned titles. Residents may establish security control subject to approval from the local authority (PBT), but the public roads or facilities within that area remain public property or for public use. So, one matter we need to make clear is that a non-strata housing area will not become a gated community merely because it has a guardhouse (boom gate) or the support of the majority of residents.

As for the conditions for a gated community, the development must be planned and approved from the outset as a strata community housing scheme, including the concept of a perimeter fence, access control and common property management. For a Guarded Community, one of the main conditions is that the application is made by a residents' association registered with the Registrar of Societies (ROS) and obtains at least 85% consent from occupied houses. The construction of a guardhouse must also obtain a temporary building permit from the PBT and a temporary occupation licence (TOL) from the Land Office if the structure involves a public road reserve. The installation of a boom gate or other form of access control is subject to approval from the PBT and the technical conditions stipulated. Public roads may not be closed or turned into what are effectively private roads, and emergency access must always be ensured. It is important to clarify that 85% resident consent is a requirement for applying for a guarded community scheme, but it is not a right to close or take over a public road. The PBT still needs to look at the actual function of the road if it is a road to another estate, used for public facilities, or important for emergency access. It may not be closed at will. Imagine if there were a fire or a medical emergency, but fire engines or ambulances arrived late because the route was blocked, or residents in the back estate were cut off from their entry and exit routes because of an unsuitable guardhouse construction. That is why any access control must be planned so that the function of public roads and emergency access is not affected. The State Government understands residents' need to improve security, but security control must still be implemented within the framework of the law, without infringing on the rights of other parties or public interest.

Part B asks about the steps taken by the government to assist the control of existing housing. For the information of the Honourable Member, for existing housing areas, the State Government is aware that there are schemes that have operated for a long time without full approval. Some do not meet the conditions, and some are still in the process of obtaining approval. There are also disputes that have arisen among residents themselves about access or about the charges imposed. Therefore, the State Government's approach is not solely through enforcement. Our priority is to provide space for the process of regularisation and harmonisation, so that schemes that can still comply can be assisted to become valid and orderly. Among the measures implemented is to facilitate the application process through standard checklists and application form templates. This enables residents' associations to prepare applications more easily without having to appoint expensive planning consultants, thereby reducing costs for residents. The State Government has also stipulated that PBTs coordinate reviews with the relevant agencies, including the Land Office, ROS, the Ministry of Home Affairs (KDN), the Royal Malaysia Police (PDRM) and the relevant technical departments, so that issues relating to land status, security licences and technical requirements can be resolved in a more organised manner. At the same time, engagement sessions and technical guidance are conducted together with residents' associations to help them understand what needs to be corrected, including the location of guardhouses, guards, security barriers, road reserves, traffic flow and safety aspects.

As an example, under MBI, a townhall session with residents' associations in Zone 24, which is under the constituency of the Honourable Member for Simpang Pulai, was also held in May last year to explain the conditions and issues relating to the Guarded Community Scheme. In its implementation, the PBT must play a proactive role in helping this regularisation process. If documents are incomplete, state what is still required. If there is a technical issue, explain the corrections that need to be made. If a structure can still be harmonised, help the residents' association find a way to comply. I also wish to take this opportunity to remind all residents' associations to review the status of the security schemes in their respective areas. The fact that a guardhouse or boom gate has been operating for a long time does not mean that it has automatically obtained approval or complies with the law. If a scheme that is operating still does not have full approval, do not wait until receiving a notice or enforcement action. Come forward now, check the status and submit an application to the PBT. At the same time, regularisation does not mean that all existing structures will automatically be approved. What can be corrected, we will help to correct, but if it involves basic matters such as closing public roads, obstructing access to other areas or security issues, corrective action remains necessary. The State Government's approach is to provide space for compliance first, while enforcement is implemented in stages once a reasonable opportunity and period for correction has been given.

Regarding part C, on efforts to prevent issues like this from continuing to occur, for the information of the Honourable Member, for the future the State Government wishes to prevent the same problems from recurring. Therefore, this matter must be addressed from the planning stage and from the time of purchasing a house, and not only after residents have moved in and disputes begin to arise. So, firstly, the actual status of a development must be clear from the marketing stage. Promotional materials by developers must be consistent with the actual status and approval of the development.

If a development is non-strata, it should not give a misleading impression as if buyers enjoy control rights like a gated community. Secondly, house buyers also need to have awareness as consumers. Do not merely look at the words gated and guarded in an advertisement. Check whether the development is strata or not, and what form of security control has actually been approved. Thirdly, the PBT and PlanMalaysia Perak will continue to expand explanations through guidelines that are easier to understand, FAQs, review channels, engagement sessions and access to application forms and procedures. Our aim is for the public to know from the outset what they are buying, what their rights are, and what is actually permitted by law. The State Government supports the efforts of society to improve the security of residential areas, but ultimately security must be implemented lawfully, in an orderly manner, and in balance with the rights of other residents and the public interest. Thank you.

Deputy SpeakerEN

Supplementary question. Simpang Pulai. Please.

Cik Wong Chai YiPKR · PHSimpang PulaiEN

Thank you. Thank you also. The Honourable Member for Simpang Pulai also wishes to convey thanks to Ipoh City Council (MBI) for organising explanations for nearly twenty-odd residents' associations regarding this gated community application. However, as far as I am aware, only eight out of all residential areas in Ipoh have submitted gated community applications to MBI. So, with such a very low rate, this is because other agencies and departments are involved. For example, TOL applications take time. So it is indeed very difficult for residents' associations to continue this application. So, on this, on this, what improvements are there to make this process faster and to have a clearer settlement period? Thank you.

Thank you, Honourable Simpang Pulai. It is true that, since we began the regularisation (pemutihan) exercise, based on the records under MBI for 2025, 8 applications were received, and for 2026 so far 10 applications have been received. However, at this time, no application has yet been fully approved. This does involve processes, compliance and coordination between agencies. For associations that have taken steps to submit applications, the State Government very much welcomes this cooperation, and the State Government also believes that those who have cooperated in submitting applications must certainly be given a clearer and more organised process and feedback within a reasonable period. The State Government sees that after residents' associations take the initiative to apply, the government's own process must also become more organised and have clear accountability. That is why several improvements have been and are being made.

First, the local authority (PBT) must become the main coordinator of applications and act as a single point of contact so that residents' associations do not have to shuttle back and forth between the PBT, the land office and technical agencies themselves. Second, comments from relevant agencies should be obtained concurrently as far as possible, and not wait one by one, which would prolong the processing period. Third, every application must have a status that can be clearly identified, whether a complete application is still awaiting agency comments, requires correction, or is ready to be referred for a decision. Fourth, for complete applications, the PBT must also set a clearer processing period, and if a decision cannot be given within that period, the applicant must also be informed of the reasons and the matters still pending. So our principle is simple: we do not want to relax the requirements, but the process for complying with the requirements must become clearer, efficient and orderly. If we want residents to come forward to apply and comply with the laws of the government's own system, we will also ensure that it is always responsive, easily accessible and able to make decisions within a reasonable period. Thank you.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Alor Pongsu.

Deputy SpeakerEN

Alor Pongsu, please.

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Thank you, Mr Speaker. I have listened to the answer from the Honourable Exco just now. But I am rather confused by the words "penerangan" (explanation) and "penguatkuasaan" (enforcement). Because, whether it is gated or guarded, when it comes to the technical security matters just now, I am satisfied with the explanation the Honourable Exco gave. But in some areas, especially those outside Ipoh, when we go to the guard room, there is a bumbling old man on guard, with mismatched clothes. Sometimes it is a schoolboy who presses the button. Indeed, it is the residents' association. I asked the residents' association who arranged it, and they said, "We arranged it, it is cheaper to put this person here." So I want the local authority (PBT) not only to give a proper explanation but also to provide enforcement. Once, at one condominium, I went and there were 10 guards, 8 of whom were drug addicts. I don't know where the mistake lies. They weren't even wearing uniforms. Because we know that a proper security company is expensive, and of course the police will first screen who they are and so on. So I want to ask, or rather I want to ask the Honourable Exco, more about enforcement. When residents' associations are given power over security matters, I feel the PBT must follow through to the end, or jump in at any time to see who is guarding. There was one place where I went and they were wearing school sports day clothes. I asked, "Are you in school?" "Oh, part-time, part-time, uncle." So I ask the Honourable Exco to please look into this matter. Thank you.

Thank you to the Honourable Alor Pongsu. For the Honourable Member's information, the requirements for enabling a residents' association to be approved for a guardhouse and the like, and the related security schemes, indeed have many requirements and rules, which I mentioned earlier, mainly the basic and principal requirements. Of course, these include who may be appointed as a guard, and the licence for security services, which are also governed by regulations and set out in the guidelines of the planner under the relevant scheme. So certainly, a residents' association cannot arbitrarily appoint just anyone as a guard. Moreover, if they are schoolchildren, as the Honourable Member described, they must certainly comply with the existing rules, not only in terms of the security licence of the guarding company, but also in terms of, in terms of, in terms of the employment acts and related laws in force.

So the State Government takes note that, at present, most and the majority of these security control schemes that exist have not received approval. Our efforts and our direction are focused on regularisation, where we give space, we give explanation, we give the opportunity to correct what is still not right so that they can comply with the existing rules. Furthermore, through regularisation, more of these schemes can obtain approval and thereafter operate lawfully and in an orderly manner. As for enforcement action, it will be taken in stages. This means that once the full space and time have been given, and there is still no action and no cooperation, then enforcement action becomes the next option. Thank you.

Tronoh.

Tuan Haji Razman bin ZakariaPAS · PNGunong Semanggol

Timbalan…

Deputy Speaker

Tronoh sila.

Thank you, Deputy Speaker. I was very interested in the explanations given by the Honourable Exco just now, where we can see that some developers have built a new housing scheme together with a new guard house, but the guard house that has been handed over to the residents no longer has approval from the local authority (PBT). So, I would like to ask the State Government, what is the direction for resolving this problem? That is all, thank you.

Thank you, Honourable Tronoh. To prevent the incident mentioned earlier from continuing to happen, the State Government has also brought this issue to the level of the Ministry of Housing and Local Government (KPKT), because when developers apply for marketing and advertising, there are indeed approvals that must be applied for, and we seek cooperation from the Federal Government to focus on and monitor so that developers do not make advertisements that do not reflect the actual situation, especially giving the impression of something that has not received any approval at all. So this is something that the Federal Government can help to control at its level, and at the level of the PBT and the state, we ensure that any applications submitted, including plans and so on, are always given focus and checked to ensure that only correct information is conveyed through advertisements, marketing and so on. Thank you.

Deputy SpeakerEN

Next, I invite...

Tuan Haji Razman bin ZakariaPAS · PNGunong SemanggolEN

Deputy Speaker, may I, may I add a little? A supplementary question.

Deputy SpeakerEN

Please summarise. Please, please.

Tuan Haji Razman bin ZakariaPAS · PNGunong SemanggolEN

Thank you, Deputy Speaker. Thank you, Honourable Exco. Looking at the matter of Guard Integrated Houses, this has now become a trend, and those who live in areas of Guard Integrated Houses seem to have a somewhat higher social status. Perhaps the PBT can give some explanation. The first question is why this trend has emerged, which seems to reflect a security or a threat to security in public housing areas in particular, which has increased to some extent, and how about communities in ordinary public housing? In the past we had Rukun Tetangga to control security, and now it seems that Rukun Tetangga no longer functions. What steps does the PBT take to guarantee security in public housing areas or housing estates for people of somewhat lower social status? Okay, I ask for an explanation.

Thank you, Honourable Gunong Semanggol. In terms of the role of the PBT, because earlier we discussed the need to improve security, this is something the State Government takes note of. However, as I explained earlier, there are rules and basic principles that we cannot allow. For example, roads that are access to public facilities, roads that serve as security access and also roads for the general public, we cannot close off in the name of security or to establish access control. Nevertheless, for residents' associations that feel there is a need to submit applications, the PBT will help provide technical guidance.

If there is a need, for example, to install security barriers, what their operating hours should be, what locations are suitable so that we minimise issues or disputes that arise, and for security issues too, I think this also involves several different agencies, including the Rukun Tetangga (KRT) mentioned earlier. How do we strengthen the function of KRT, whether through patrol schemes or other activities, to jointly improve community security and also to address issues if there are any and so on? Cooperation with the police is also very important, and under the Smart City initiative, the PBT is also trying to improve public facilities, for example the installation of CCTV, lighting and so on, and all of these efforts are toward improving security at community level. Thank you.

Deputy SpeakerEN

Next, I invite the Honourable Member from the Lubok Merbau constituency to put forward the question number. Please.

Encik Azizi bin Mohamed RidzuwanPAS · PNLubok MerbauEN

Thank you, Deputy Speaker. Assalamualaikum and good morning. Lubok Merbau, question number three.

Assalamualaikum Warahmatullahi Ta'ala Wabarakatuh and greetings of peace. Thank you to the Honourable Deputy Speaker and also to the Honourable Lubok Merbau, who asked about TVET youth.

For the information of the Honourable Lubok Merbau, the TVET ecosystem in the State of Perak is now being sustained based on the Perak Sejahtera 2030 Plan, particularly under the human capital development agenda and the national TVET corridor agenda. To ensure that TVET graduates remain competitive in the skills they have pursued, the policy must first be strengthened. Accordingly,

the State Government, through the Perak Youth Aspiration Centre (PASAK), continues to intensify the implementation of the empowerment of TVET programmes, including training, skills enhancement or upskilling, and reskilling across the State of Perak. This approach is implemented to ensure that youth, especially TVET graduates, always possess relevant skills, remain competitive and are able to build sustainable careers in the fields they have entered.

At the same time, the State Government intends to encourage them to continue working and contributing to the economic development of the State of Perak. To achieve this objective, the State Government through PASAK has conducted the Industrial Modular TVET programme, which is a training programme tailored to industry needs and guarantees employment opportunities to participants after completing the training. Through this Industrial Modular TVET programme, the State Government through PASAK has also determined that the implementation of TVET programmes must involve certified industry players who operate within the State of Perak. This policy aims to ensure that the benefits of the TVET empowerment initiative can be enjoyed comprehensively by local industries registered in this state. Through this approach, training opportunities will be given priority to the children of Perak, while placement and matching of employment will also focus on career opportunities available in the state.

Thus, TVET development not only strengthens youth employability, but also helps meet the workforce needs of local industries and supports the continuous economic growth of Perak. Based on records, from 2022 to June 2026, the State Government of Perak through PASAK has conducted a total of 289 Industrial Modular TVET programmes, which benefited 4,662 participants from among the people of Perak. The effectiveness of this Industrial Modular TVET programme has been proven, as 90.09%, or 4,200 participants, were placed in employment after completing the training. Apart from the Industrial Modular TVET programme, there are 11 other TVET programmes under PASAK based on short-term practical training. This initiative is implemented to expand access and opportunities for skills upgrading among the children of Perak. Based on records, for 2022 to June 2026, a total of 430 TVET training programmes have been implemented and benefited 7,161 participants from among the people of the State of Perak.

The implementation of these short-term TVET programmes has given the children of Perak the space to gain early exposure to the basics of skills in various fields. At the same time, these programmes also serve as a medium to cultivate interest in TVET, especially among youth, so that they may pursue further studies to higher levels. Indirectly, this effort can contribute to increasing student enrolment in public training institutions in the State of Perak. To ensure they remain competitive in the fields they have entered, the Perak State TVET Council plays an important role in realigning the TVET ecosystem in the State of Perak, through preparing skilled manpower from training institutions and matching them with job offers from the industry market, in order to meet the state's development needs and the empowerment of human capital in the State of Perak by 2030. Thank you.

Deputy SpeakerEN

Supplementary question, Lubok Merbau, please.

Encik Azizi bin Mohamed RidzuwanPAS · PNLubok MerbauEN

Thank you, Honourable Exco. The Perak Youth Aspiration Centre (PASAK), as is well known, is one of the coordinating bodies for the TVET corridor in the State of Perak. So the question is, how many youths registered with PASAK have obtained employment suited to the skills they have learned, and is their progress constantly monitored under PASAK so that they remain sustained in their careers?

Thank you to the Honourable Lubok Merbau, who asked about the number of participants or youths involved in TVET programmes under PASAK. For information, as we are well aware, the Youth Development Act that has recently come into force, namely Act 786, which sets the age between 15 and 30 years, covers the number of participation or youth participants involved in the 11 clusters of TVET programmes managed by PASAK. The data I can provide: first, for 2022, a total of 611 persons. 2023, a total of 861 persons. 2024, 839 persons. 2025, 883 persons. For January to June 2026, 276 persons. The overall total from June to from 2022 to June 2026 is 3,470 persons. As for the method and means to ensure that those who join these courses obtain employment opportunities and are given space and chances, it depends on the capability or follow-up of the agencies implementing the courses, and the outcome from the course implementers or the training managers in providing employment opportunities. Some are given space and job offers immediately after completion, and there are youths who join certain courses, for example the TVET Mahir Kerja course, which can succeed in becoming self-reliant. For example, courses such as hair cutting, and courses related to cake making and so on. So, the meaning of the space and opportunity of the course depends on the capability and ability of the participants, and ultimately PASAK will ensure that those who are offered jobs obtain a sufficiently good salary based on the skills they have learned.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Supplementary question. Pengkalan Hulu.

Dr. Mohamad Yusri bin BakirUMNO · BNAyer KuningEN

Supplementary question. Ayer Kuning.

Deputy SpeakerEN

Ayer Kuning, please.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Pengkalan Hulu first.

Dr. Mohamad Yusri bin BakirUMNO · BNAyer KuningEN

Thank you, Deputy Speaker. Dato' Exco, my supplementary question is, what is the main mechanism of the State Government to ensure that TVET training is aligned with the needs of the industries existing in this State of Perak? And secondly, if it can be stated what types of TVET training are favoured by youths in Perak, so that these can be highlighted to them in the future. Thank you.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Deputy Speaker, Honourable Exco. May we do it together? Because it is related.

Deputy SpeakerEN

I ask the Honourable Exco to answer first.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Okay, thank you.

Thank you to the Honourable Ayer Kuning, who asked about the mechanism of the State Government to ensure that TVET training is truly aligned with industry needs. As I mentioned earlier, the State Government through PASAK implements the Industrial Modular TVET Programme, which is a short-term training that provides training modules tailored to industry needs and also guarantees career placement after completion of the training for participants who show outstanding performance or potential in the skills learned. To ensure that the TVET programmes offered are truly aligned with industry needs, the State Government has already established the State TVET Council in 2024 as a Body that will coordinate TVET empowerment initiatives in the State of Perak among government bodies, industry players and training institutions in the State of Perak. In addition, the State Government through PASAK will also conduct workshops, collaboration and discussions with stakeholder bodies in the development of the 5 State Growth Nodes. Among them are the Technical Committee Meeting on TVET and the Perak Academia Collaboration Workshop, to discuss the direction of TVET in the State of Perak under the Perak Sejahtera 2030 Plan agenda, as well as discussions with industry and training providers to coordinate inputs for preparing training modules that support industry needs. Thank you.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Deputy Speaker, may I?

Deputy Speaker

Sila, ringkaskan.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Thank you to the Deputy Speaker. The Honourable Exco, I am very interested when TVET is mentioned because I am also a TVET graduate, and I fully support the State Government's efforts to implement the AIM TVET Roadshow Programme for Perak State. This is an initiative by PASAK that is carried out every year, and the nearest programme may be on 19 and 20 September at Stadium Indera Mulia. Only last year it was supposed to be held in the Hulu Perak district but was changed to Tapah. I attended a meeting with the Honourable Exco at the State Government Complex (KKN) Lenggong at that time, and I would like to request the Honourable Exco and the State Government to hold it in the Hulu Perak district, because the Hulu Perak district has very limited access to the city. We in the district only have one community college or TVET centre. So the young people of Hulu Perak find it difficult to obtain information about TVET. I myself had to study overseas, in Kedah and also in Perlis. So I would like to propose that a TVET Roadshow be held in the Hulu Perak district, perhaps after this, next year. My question to the Honourable Exco is about what follow-up assistance is provided by the State Government, including training, skills upgrading or professional certification, as well as financing and job matching, to ensure that TVET graduates remain competitive, especially for young TVET graduates in Perak State, so that they will not be left behind when they enter the TVET field and will become part of the workforce, especially in Perak State? That is all my question to the Honourable Exco. Thank you.

Related to that, thank you to the Honourable Pengkalan Hulu regarding the AIM TVET with Cikgu Saarani Roadshow, which is one of the platforms we use to promote and expose TVET to school students and also the local community. This programme, we see, really helps change the perception of the public, especially among those who still regard TVET as a second choice in career options, and with the AIM TVET with Cikgu Saarani Programme that we implement, it also provides space and opportunities for certain groups to find and obtain high-skilled career paths, especially for young people in Perak.

Regarding the wish and also the request from the Honourable Pengkalan Hulu, Insha Allah in November we will hold one more, the last one: the AIM TVET Roadshow in the Lenggong and Pengkalan Hulu areas. This means that what we promised last year, we will fulfil this year, and Insha Allah in the 11th month it will be carried out, because we see that the AIM TVET with Cikgu Saarani Roadshow is one of the programmes that really provides space for young people. In terms of the number of visitors or attendance, I can state the data here: in 2025, on 19 April, the AIM TVET with Cikgu Saarani Roadshow in Tapah received 2,384 visitors from among young people and school students. The 30 June AIM TVET with Cikgu Saarani Roadshow, in conjunction with the Presentation of the Perak Sejahtera 2030 Plan Report, in Lenggong, had 315 people. Meanwhile, on 4 July, the AIM TVET with Cikgu Saarani Roadshow in Gerik had 195 people. In 2021, which we will implement during KAMU last year, we succeeded in receiving 2,598 visitors. On 25 October last year, the AIM TVET with Cikgu Saarani Roadshow, in conjunction with the 60th anniversary celebration of Sekolah Menengah Syeikh Abdul Ghani, had 161 people, and in 2026, during the AIM TVET with Cikgu Saarani Roadshow in conjunction with the National-level Teachers' Day celebration, we received 593 visitors at Meru. We see that it really provides space and opportunity. This programme is a collaboration between the State Education Department, public and private industry players, and training institutions.

Regarding the second question, what assistance or matters can we help with? When these people are given short-term courses, perhaps after they have started working, industry players can offer them further courses as one element to ensure these young people do not leave the industry they are already working in, because we want them to continue working in the relevant industries by obtaining further exposure to skills and also knowledge related to the course in question. Thank you.

Deputy SpeakerEN

Thank you. Next, I invite the Honourable Member.

Yang Berhormat?

Deputy SpeakerEN

See you. Please note this is a hot topic. Thank you, YB. Next, I invite the Honourable Member from the Tronoh constituency to put forward a question. Please.

Thank you, Deputy Speaker. Tronoh question, question number 4. Thank you.

Encik Teh Kok LimDAP · PHAulongEN

Thank you, Honourable Deputy Speaker. Salam Malaysia Madani, Salam Perak Sejahtera 2030. Honourable Tronoh, for the information of the Honourable Tronoh and the august House, the State Government gives attention to the development of renewable energy, including solar energy, as one of the sectors with potential to attract new investment, generate economic activity and support the energy transition agenda. Perak has a wealth of natural resources. The land area and infrastructure network offer great potential for the development of renewable energy. Seeing this potential, the government through PKNPk, the Perak State Development Corporation, through its subsidiaries and strategic partners, continues to explore and implement various solar hydro energy and green technology initiatives throughout the state. The State Government has mandated PKNPk to coordinate the development of solar farms, particularly in Mukim Kampong Gajah and Mukim Pasir Panjang Hulu, Perak Tengah District. From less productive land to the development of large-scale solar farms and solar PV systems, to floating solar on hydroelectric dams, smart solar street lights and solar installations on public buildings and mosques. This initiative reflects PKNPk's integrated approach in optimising the state's resources and assets to generate sustainable economic value.

This effort is not merely about producing clean energy. It also opens the way for investment, creates economic opportunities, strengthens the participation of local industry and helps reduce carbon footprints for a more sustainable Perak for today's and future generations. Based on current records, there are 28 Large Scale Solar (LSS) projects in Perak State with a total overall capacity of 1,441.3 megawatts, comprising twenty-one projects that have begun operation with a capacity of 542.18 megawatts and seven projects that are under development with a capacity of 899.12 megawatts. For projects that have been in operation, across 21 projects in total, 542.18 megawatts have been developed in several districts in Perak State. The Kerian district recorded the highest capacity with four projects totalling 190.95 megawatts, followed by Batang Padang with three projects totalling 73 megawatts. Gopeng with 1 project of 50 megawatts capacity and Sungai Siput with 1 project of 49 megawatts capacity. Meanwhile, Manjung has 3 projects with a capacity of 46.99 megawatts. Kampar 3 projects totalling 34.99 megawatts. Bidor 1 project with a capacity of 30 megawatts and Kinta 2 projects totalling 24.99 megawatts.

Operational projects are also located in Perak Tengah with a capacity of 17.36 megawatts. Larut Matang and Selama with a total of 24 megawatts. As for projects under development, there are 7 projects with a total capacity of 899.12 megawatts. The largest capacity project is in the Larut Matang district involving a capacity of 470 megawatts, followed by Hilir Perak with 95 megawatts, Perak Tengah with 29.99 megawatts and Selama with 4.16 megawatts. In addition, there are three projects in development with a total capacity of 299.97 megawatts. Each has a capacity of 99.99 megawatts. Overall, the development of these LSS projects shows that solar energy capacity in Perak State has not only reached a significant level of operation, but also has great potential for additional capacity through projects under development, with an additional capacity of 899.12 megawatts. Of the projects under development, the total LSS capacity in Perak State has the potential to reach around 1,441.3 megawatts once all these projects are completed and begin operation.

For the information of the August House, the Perak State Development Corporation, through its subsidiary Maju Perak Holding Berhad, continues to play a role as one of the leaders of renewable and green energy initiatives in Perak State, particularly through the development of solar energy projects for religious and educational institutions. For the religious institutions sector, Maju Perak Holdings Berhad has established a strategic partnership with the Perak Islamic Religious and Malay Customs Council (MAIPk) through the implementation of solar photovoltaic panel installation projects at 20 pilot mosques in several districts in Perak State. This project is part of efforts to expand the use of clean energy while helping mosques reduce dependence on conventional electricity supply and optimise utility costs in the long term. Before the project was implemented, an initial technical study was carried out on 85 mosques, and 20 mosques were identified as pilot locations. The overall project for the 20 mosques involves a generation capacity of 513.01 kilowatts with an initial investment value totalling RM 2.25 million. Among the completed projects is Masjid Sultan Yussuf Izzuddin Shah in Kuala Kangsar, which has a solar capacity of 52.7 kilowatts and serves as one example of low-carbon mosque development in Perak State. The implementation of this mosque solar project also uses the Clean Energy Metering Scheme 3.0, which allows surplus electricity generated during the day to be fed back into the grid. This approach not only increases energy use efficiency but also provides economic benefits to the mosque in the long term.

As for the education sector, solar energy initiatives have also been expanded through a solar project at Sultan Idris Education University (UPSI), particularly at the Sultan Azlan Shah campus, Proton City. This trial was carried out through collaboration between UPSI Holdings Sdn Berhad, Tenaga Nasional Berhad and strategic partners in the development of solar facilities, including covered solar car park structures. The project has a generation capacity of 3.24 megawatts and is expected to provide electricity cost savings of around RM1.35 million to RM1.55 million per year. The solar installation also applies the concept of dual-function space use, among others in vehicle parking areas, sports complexes, convention festival grounds, and faculty buildings and university mosques. Overall, the implementation of these projects reflects the State Government's commitment to supporting the energy transition agenda and the sustainability of Perak State. Not only through the development of renewable energy capacity, but also by ensuring that the economic, environmental and social benefits can be enjoyed by institutions and local communities. Through this approach, PKNPk not only acts as a facilitator of economic development, but also plays a strategic role in strengthening the green technology and renewable energy ecosystem in Perak State.

For the information of the Honourable Tronoh, in terms of benefits to the State Government, the development of this project has the potential to bring in new investment and generate revenue through instruments related to land and state resources, such as premium fees for leases and water charges, depending on the structure of each project and subject to the regulations in force. In terms of benefits to the people, the development of the solar sector has the potential to create economic and employment opportunities directly and indirectly, particularly in the fields of construction, engineering, installation, operation and maintenance. At the same time, this sector opens space for the participation of contractors, suppliers and local service providers, thereby stimulating local economic activity and improving the skills and capacity of the local workforce and in the field of renewable energy. Overall, the development of the solar industry not only supports the clean energy and sustainability agenda. It also provides economic spillovers that can be enjoyed by the people and local communities. The State Government's approach is not only aimed at increasing renewable energy generation capacity but also at making this sector a catalyst for investment inflows, revenue generation and economic activity, as well as the development of the clean energy value chain in Perak State. Thank you.

Deputy Speaker

Tronoh, sila.

Thank you to the Honourable Exco for a very comprehensive answer, and an answer that can be said to be very important under the Honourable Exco's portfolio for the economic development of Perak State. Therefore, I see that in this LSS project, it has contributed much to the economy of Perak State, and I would like to ask the Honourable Exco. At present, we can see solar farms growing rapidly and advancing in Perak State, and what is the next step for the State Government to install solar systems on buildings owned by this State Government? Because I see that if we can install solar systems on these State Government buildings, I believe administrative costs will decrease in the future. Thank you.

Encik Teh Kok LimDAP · PHAulongEN

Thank you to the Honourable Tronoh for the supplementary question. For the information of the Honourable Tronoh, compared with rooftop solar, the scale of LSS is indeed not as big as that. However, the Management Services Division, State Secretary's Office of Perak, has received several proposals relating to the installation of solar systems at State Government premises. In my view, the administrative policy of the State Government has no objection to any State Government department and agency implementing solar system installation initiatives at their respective premises, subject to the suitability of the premises and compliance with the rules and procedures currently in force. However, any proposal for installing solar systems must first take into account and examine technical factors, safety, the suitability of the building structure, the capacity and capability of the existing electrical system, the impact on utilities, and the cost and maintenance implications, to ensure that the installation does not compromise the safety and function of State Government buildings. To date, the State Government's rooftop solar portfolio through Maju Perak Holding involves nine locations with a total installed capacity of approximately six hundred and 70 kilowatts. These locations include Bazar Ipoh, Perak Tengah District Council, Selama District Council, Pengkalan Hulu District Council, as well as several mosques in Perak State. The implementation of this solar system helps reduce electricity usage from the grid, saves utility costs and reduces carbon emissions. At the same time, it shows that the renewable energy agenda of Perak State is not only focused on large-scale solar projects but is also extended to government buildings, commercial assets and community institutions.

For the information of the August House. The State Government will continue to examine the potential to expand this model to more assets owned by the State Government and local authorities, subject to the viability, technical and financial aspects of each project. That is all from me. Thank you.

Deputy Speaker

Kamunting, sila

Exco, has the government conducted a study on the land area required for a solar farm? Because in Perak there are many mines, and if we use land, it will later conflict with farms that produce food. So I want to know how many of these solar farms use floating panels to be developed as solar farms, and how much has been developed using land, and what in the future we are considering, whether we will also use land for solar farms or whether we will look for abandoned mines or these lakes to develop these solar farms? Because it will become a conflict if we use land, when solar is indeed very good, and if possible, how many solar farms we have developed using floating panels, and how much we have used land, and how the future basic policy or direction of the government will be. Do we still want to use land, or do we want to look for abandoned mines? Thank you.

Encik Teh Kok LimDAP · PHAulongEN

Thank you, Honourable Kamunting. Okay, for the information of the Honourable Kamunting, indeed many areas in Perak State have been allocated for this solar project, involving abandoned mining pools, which is why there are many, particularly in the mukim of Perak Tengah District, and also in the floating solar projects that are easy in not only the final study stage to be developed at Tasik Kenering and Tasik Temenggor. So for further information, perhaps I can arrange it in writing. Thank you.

Deputy SpeakerEN

Next, I invite the Honourable Member from the Behrang constituency to put forward a question. Please.

Puan Salina binti SamsudinUMNO · BNBehrangEN

Bismillahirahmanirahim. Assalamualaikum Warahmatullahi Wabarakatuh. Thank you, Deputy Speaker. White, white jasmine, red, red pomegranate. Rakyat Muallim is waiting for Behrang question number 5. Thank you.

Assalamualaikum Warahmatullahi Wabarakatuh dan Salam Sejahtera, Salam Malaysia Madani Salam Perak Sejahtera 2030. Alhamdulillah, Wa Syukurillah Wassolatu Wassalamu Ala Rasulillah. Terutamanya saya bertimakasih kepada Honourable Behrang, yang ingin tahu berkenaan dengan jumlah kemalangan yang berlaku di kawasan Behrang khususnya daripada Tanjong Malim sampailah ke Behrang dan Proton City. FT001 maknanya Jalan Persekutuan Tanjung Malim Seksyen 468 hingga 501 di Muallim.

Jumlah pada tahun 2023 adalah 14 kemalangan, 2024 (19), 2025 (20), 2026 (13). Keseluruhan kemalangan di seksyen itu sebanyak 66. Bagi seksyen FT258 pula Proton City, seksyen 0 - 0 - 0 sehingga 9 Muallim Jumlah kemalangan 2-0-0. 2023(0), 2024 (1),2025 (0,) 2026 (0)... tak habis lagi dan jumlahnya keseluruhan adalah 1. Bagi Seksyen Jalan FT193 Jalan Persimpangan Tanjong Malim sampai ke Behrang Stesen, Seksyen 0-0-0 sehingga 13 di Muallim, jumlah kemalangan 2023 adalah 1, 2024 (0) 2025 (1), 2026 belum habis lagi 6 jumlah kemalangan di seksyen tersebut adalah 8. Jumlah yang dinyatakan di atas merupakan rekod daripada pihak Jabatan Kerja Raya (JKR) melalui Road Accident Monitoring System ataupun RAMS dengan izin Jabatan Kerja Raya. Tu RAMS situ memang di aplikasi daripada Jabatan Kerja Raya Perak.

Bagi rekod pihak polis Polis Diraja Malaysia (PDRM) pula, jumlah kemalangan yang direkodkan berlaku di sepanjang laluan Tanjong Malim Behrang Proton City daripada tahun 2024, 26, 25, dan 26 adalah sebanyak 340 kes. Dia ada beza sikit, ye. Namun begitu, pihak PDRM terutamanya Bahagian Siasatan dan juga Penguatkuasaan Trafik Daerah Ibu Pejabat Daerah Polis Muallim akan sentiasa melaksanakan penguatkuasaan di kawasan terbabit bagi mengurangkan risiko kemalangan jalan raya.

Untuk makluman Honourable Behrang, rekod kemalangan antara JKR dan PDRM dia agak berbeza sikit sebab dia tidak di...di masukkan ke dalam Road Accident Monitoring System (RAMS) yg dibuat oleh JKR. Antara usaha yang dilakukan oleh pihak JKR bagi mengurangkan risiko kemalangan di kawasan tersebut, adalah pihak JKR telah mengemukakan permohonan peruntukan di bawah program rawatan kawasan kerap berlaku kemalangan ataupun blackspot bagi melaksanakan kerja-kerja penambahbaikan struktur jalan serta penambahan perabot jalan yang bersesuaian. Usaha ini bertujuan untuk meningkatkan tahap keselamatan jalan raya, memberi amaran dan juga panduan yang lebih jelas kepada pengguna jalan raya serta mengurangkan risiko berlakunya kemalangan. Bagi tahun 2026, pihak JKR telah melaksanakan program memperelok lokasi kerap berlaku kemalangan di FT001 Laluan Ipoh - Tanjung Malim Seksyen 487 di Daerah Muallim dan telahpun siap minggu lepas. Kepesatan pembangunan Tanjung Malim, khususnya di susulan kawalan...pewujudan bandar Proton City, telah memberikan impak terhadap kapasiti jalan-jalan di bawah seliaan JKR. Ini disebabkan oleh kemasukan ramai petugas-petugas Proton… Proton sendiri dan juga daripada Universiti UPSI dan juga daripada Politeknik… err Politeknik di Behrang. Peningkatan jumlah trafik terutamanya pada waktu puncak berpotensi menyebabkan kesesakan lalu lintas serta menjejaskan kelancaran pergerakan pengguna jalanraya.

Sehubungan itu, bagi memastikan aspek keselamatan kelancaran trafik dan juga keselesaan pengguna sentiasa terjamin, Kerajaan Persekutuan telah meluluskan kerja-kerja menaik taraf Laluan Persekutuan FT001 di bawah tajuk menaik taraf Lebuh Raya Tanjong Malim, Lumut Fasa 1 Jalan FT001 di Kawasan Perindustrian

Daerah Muallim CKD01 dari Seksyen 473 sehingga Seksyen 4476 dan kerja-kerja awalan Jalan FT001 daripada Seksyen 466 sehingga Seksyen 483 reka bentuk iaitu di yang di kawasan tersebut.

JKR akan menjalankan audit keselamatan jalan raya di lokasi-lokasi yang telah pun dikenalpasti di dalam kawasan Dun Behrang bagi meneliti punca utama kemalangan sama ada disebabkan oleh faktor geometri jalan, kekurangan pencahayaan ataupun kecacatan perabot jalan. Tidak ketinggalan juga, pihak Jabatan Pengangkutan Jalan (JPJ) Negeri Perak telah mengenalpasti beberapa lokasi blackspot ataupun kawasan-kawasan yang kerap berlaku kemalangan di kawasan Dun Behrang, iaitu dibuat kajian oleh JPJ Negeri Perak bersama sama dengan Majlis Keselamatan Jalan Raya (MKJR) Negeri Perak. Kawasan yang kerap berlaku kemalangan jalan raya di sekitar Behrang Perak ialah di laluan Lebuh Raya Utara Selatan (PLUS), lokasi utama kemalangan jalan raya di Behrang PLUS ialah… jadi mereka yang lalu dekat kawasan lebuh raya PLUS itu di kawasan ini, perlu berhati-hati sedikit. Yang pertamanya Kilometer 378 sehingga Kilometer 386 Slim River dan Behrang. Di sini berlaku kerap kenderaan-kenderaan besar ni ataupun tanker-tanker ni kadang terbalik di kawasan tersebut. B, kilometer 393 arah selatan laluan Behrang-Tanjong Malim. Jadi makna daripada Behrang nak menyampai Tanjong Malim itu kawasan tu juga kerap berlaku kemalangan, dan yang ketiganya Kilometer 390 laluan Lebuh Raya PLUS. Bagi kawasan Dun Behrang, Kerajaan Negeri akan terus memperkukuhkan tindakan keselamatan jalan raya melalui pendekatan berikut; pengenalpastian dan juga pemetaan lokasi berisiko tinggi berdasarkan analisis data kemalangan termasuk juga faktor lokasi jenis kemalangan, masalah kejadian dan juga tahap-tahap ke... ke...keterukan kemalangan, tahap-tahap keterukan kemalangan.

Dato' Seri Speaker, pemeriksaan keselamatan jalan raya atau Road Safety Audit & Inspection dengan izin secara berkala bagi mengenal pasti faktor fizikal dan juga persekitaran jalan-jalan yang boleh menyumbang kepada kemalangan. Penambahbaikan infrastruktur keselamatan jalan raya antaranya pemasangan ataupun penambahbaikan lampu jalan, lampu isyarat, papan tanda, garis jalan Road Line Road Stars, penghadang jalan ataupun guardrail serta kemudahan lain yang bersesuaian berdasarkan keperluan lokasi. Penguatkuasaan secara bersasar oleh JPJ dan PDRM di lokasi di lokasi dan juga waktu-waktu yang tertentu dikenalpasti berisiko tinggi. Khususnya terhadap kesalahan aspek memandu laju, memotong dua di garisan berkembar, memandu secara berbahaya serta kesalahan yang sering menyumbang kepada kemalangan. Pemantauan terhadap keadaan dan juga pemantauan pengguna jalan raya termasuk kenderaan perdagangan, motorsikal dan juga kenderaan persendirian melalui operasi penguatkuasaan serta pemeriksaan-pemeriksaan dari masa ke semasa berkala. Program pendidikan dan juga advokasi keselamatan jalan raya kepada komuniti setempat, sekolah, institusi pendidikan dan juga pengguna jalanraya bagi meningkatkan kesedaran pengguna risiko kemalangan serta kepentingan pematuhan undang-undang jalan raya. Kerjasama antara agensi melalui perkongsian data dan juga penyelarasan tindakan antara Kerajaan Negeri, JPJ, Kementerian Pengangkutan, JKR dan juga PDRM, pihak berkuasa tempatan dan juga agensi berkaitan bagi memastikan tindakan pembetulan dapat dilaksanakan secara bersepadu.

Kerajaan Negeri Perak juga akan terus memantau keberkesanan langkah-langkah intervensi yang dilaksanakan dan mengambil tindakan susulan berdasar perkembangan serta kemalangan semasa. Pendekatan ini penting bagi memastikan kawasan yang dikenal pasti berisiko tinggi dapat ditangani secara fokus sekiranya mengurangkan kadar kemalangan dan meningkatkan tahap keselamatan pengguna jalan raya di DUN Behrang khususnya. That concludes my reply. Thank you.

Deputy SpeakerEN

Supplementary question. Behrang, please.

Puan Salina binti SamsudinUMNO · BNBehrangEN

Thank you, Honourable Dato' Seri, for the answer, which I found very complete and which has eased somewhat the queries of the community in Dun Behrang. However, I would like to get a little clarification on how JKR or the government views or handles issues that are sometimes raised by the public, especially through social media. Yes, sometimes these people need an immediate answer and do not want people to say that they have to be raised in the state assembly sitting and so on. Yes, how does JKR monitor every issue that arises, yes, from the people in the area so that they do not, as people say, nurse their anger until they get an answer in the Dun sitting, yes, in the meeting and so on? Thank you.

Alright, thank you Behrang for the supplementary question. At the Ministry of Works (KKR), we have a unit called the Crash Construction Units, Crash Reconstruction Unit or in our language MIROS. Malaysian Institute of Road Safety Research (MIROS) provides studies on most of the accidents they examine, not only in Dun Behrang but throughout our country, caused by very risky driving. Malaysians, when they drive on the road, they drive their vehicles dangerously. Secondly, they are far too fast, even though we set speed limits, most drivers are fast. Thirdly, the cause of accidents is that they tire quickly. Malaysian drivers tire quickly, and when they are tired, driving is dangerous, but it is not only that factor, MIROS also found other factors such as road conditions and the landscape of the road itself. Secondly, there is the factor of their vehicles. That vehicle factor and the surrounding environment including weather, rain, and sometimes hitting wild animals that cross the road at night, and in Muallim this is well known for many wild animals that like to roam the FT 001 roads. So that causes accidents to frequently occur in the Muallim area, which was mentioned earlier as 35, 356 cases.

So for that, we want to ensure that the departments concerned with this road, including JPJ, the Ministry of Transport and also the Road Safety Council (MKJR), PDRM and the local authorities work together to ensure that the matters that have been identified can be reduced. Those are the directives that we will ensure, not under JPJ Perak State, under the Perak State Road Safety Department itself. So, we will ensure that the works that we have identified, the spots in Behrang that always have accidents as I mentioned earlier, especially on the highway between Tanjong Malim and Behrang itself, which frequently have accidents. So we must carry out many advocacy programmes, monitoring and enforcement. So hopefully with these programmes, accidents in the area of Honourable Behrang can be reduced. Thank you.

Speaker Manjoi.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Alor Pongsu.

Speaker.

Deputy Speaker

Soalan tambahan.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Alor pongsu.

Deputy Speaker

Manjoi sila.

Thank you to the Deputy Speaker. Honourable Exco, Manjoi would like to ask about a big issue in my area. In connection with the accident issue, Honourable Exco, on the main federal road, Chemor to Klebang, Klebang to Chemor, it is easier to say in front of McD, McDonald Klebang Restu at the junction to Medan Klebang Restu. For your information, Honourable Exco, in the middle of that road there is a manhole. This manhole, the water keeps overflowing and does not stop until today, and I think this complaint has become a big issue among the residents. If you look at the social media groups, the neighbourhood groups discuss why the issue cannot be settled even though the manhole is there and the problem is plainly visible before our eyes. The water that comes out disturbs road users. The road is getting more and more sunken and several accidents have occurred there, especially to riders who ride motorcycles. My question here is, JKR informed me, JKR told me that it is not JKR's, it is not under JKR, the manhole, and the water that overflows, it is not certain whether the water is from sewage or water from underground but there is a manhole. In short, JKR told me that JKR had contacted the utility companies, and all of them denied it. They asked TM, TM said no, they asked TNB, not theirs, they asked LAP, not theirs, they asked IWK, all denied it, saying it was not theirs.

I raise this here because this issue has been happening for a long time and I think we must finalise this issue, we must go down and resolve it. Because the people are affected and this causes our image to look bad. People say, surely there is nothing more we can do to make a noise. So I ask Adun Manjoi to speak here and I say here the issue is not settled and I am confident that in this House there are also those who pass that road, and shortly I can assure you here, when you all go home this evening, when you pass there, you will step in the overflowing water from the manhole whose owner until today nobody has admitted to being. Perhaps with the intervention of Honourable Exco this issue can be resolved. Thank you.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Timbalan Speaker.

Thank you, Manjoi. Ah, the road between Chemor and Klebang, accidents often happen there, not only because water overflows there but there are other causes. But I have also identified, and asked several agencies to check where the water comes out. Is the source underground water or is it from the LAP pipe nearby. Near VAT69 commando. Or from another source. So for now, I myself have not identified what the source is. If accidents are happening because a lot of water is roaming around from there, then we must find where the water comes from and we will plug the source again. So that will be done.

Correction, Honourable Exco

I made a study from LAP, from JKR and also MBI.

The correction is not, is not related to VAT69. VAT69 is on the Ulu Kinta side, in front of McDonald Klebang Restu, at the junction to enter Medan Klebang Restu. If Honourable Exco looks, there is a traffic light there at that four-way junction. Perhaps, lest I am mistaken about the information, I will forward it to Honourable Exco.

Terima kasih.

If possible, Honourable Manjoi, send me the exact location and I will ask several agencies to go and see what the source of the water is that keeps roaming on the road. Thank you.

Encik Choong Shin HengMCA · BNChenderiang

Timbalan Speaker.

Dr. Mohamad Yusri bin BakirUMNO · BNAyer Kuning

Ayer Kuning.

Encik Choong Shin HengMCA · BNChenderiang

Chenderiang.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Timbalan Speaker.

Astaka.

Dr. Mohamad Yusri bin BakirUMNO · BNAyer Kuning

Ayer Kuning.

Deputy SpeakerEN

Ayer Kuning, please.

Dr. Mohamad Yusri bin BakirUMNO · BNAyer KuningEN

Thank you, Deputy Speaker. I would like to put this question to the Exco responsible, concerning an issue of a bridge road in the Dun Ayer Kuning area. So on this occasion, I would like to ask the responsible Exco, does JKR plan to upgrade the narrow bridge, a narrow bridge over Sungai Chenderiang, FT 001 Section 546, which is at risk of flooding and accidents, which recently, about 10 days ago, within that area there was an accident that caused the death of a religious teacher, among others, the latest one. So, is there? Once again, does JKR plan to upgrade the narrow bridge. Thank you.

Thank you to Honourable Dr. Ayer Kuning. The bridge was actually built more than 50 years ago, yes, the bridge is narrow and still narrow now. But one of the causes of accidents there, Honourable, is not very much, because there is a corner after the bridge, there is a junction that is quite sharp. It is not really that, but they want to ensure the exact location of Capati Chenderiang itself that caused them to have the accident. So for that, JKR has applied for the bridge to be included in the 13th Malaysia Plan (RMK-13) Rolling Plan to be replaced with a new one so that it is clearer to go to the quarry on the right side, there is a big quarry, and then to continue to Tapah town. So for that, it is not only flooding when water comes out from the Chenderiang town, from the mountain behind Chenderiang town, there is a flash flood, the flood will hit the bridge itself, the bridge deck is always in danger. So for that, JKR has submitted a plan to replace the old bridge with a suitable one. That is JKR's plan today, regarding the flooding, which is the same as the accident problem there recently, which we will also identify, whether if we widen the bridge it will reduce the impact of accidents or reduce the water that does not drain at the bridge. Thank you.

Encik Choong Shin HengMCA · BNChenderiangEN

Mr Speaker, Chenderiang.

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

This important proposal involves His Majesty.

SpeakerEN

This... this is already 3 supplementary questions, right? Already 3 supplementary questions, right?

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Yes, yes, this is important, Dato Speaker.

SpeakerEN

Already 3 supplementary questions.

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Alor Pongsu, important.

Speaker

Ini…

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Libatkan tuanku

SpeakerEN

Exco, can we add one more question or is that enough? Two more questions. Two more supplementary questions, add more.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Terima kasih

Speaker

Ok.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Alor Pongsu.

SpeakerEN

Wait... wait, I request. I see Alor Pongsu and the other Chenderiang are no longer here. So, let Alor Pongsu ask first, then Chenderiang. After that I will move to the next question, okay. Alor Pongsu.

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Thank you, Dato' Seri Speaker. Thank you, Honourable Exco. If it is like this, it is enjoyable, the sitting can raise many matters of the people. Firstly, I thank Honourable Infra and the State Government, 70% of roads in the Dun Alor Pongsu area are already good. But I want to remind that, as I mentioned earlier to His Majesty, on the 22nd of this month His Majesty officiated Hospital Parit Buntar. We have upgraded 80% of Alor Pongsu roads, it is getting better. When Behrang talked about accidents, I want to slip a little to the accident that happened in Bagan Serai in Alor Pongsu now, which is not a road accident. I want to mention the railway station in Bagan Serai. My Dun, in my Dun for 10 years I asked for a lift and did not get it, for 10 years I asked for an escalator and did not get it. Now a major accident has happened at the KTM Keretapi Tanah Melayu Berhad (KTM) lobby there, whoever goes up and down, their car exhaust is certain to get caught, certain to be torn off. KTM just acts dumb.

Speaker

Ok, soalan-soalan

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Please. So the question is, has Honourable Exco received this complaint and what action will be taken?

Speaker

Exco

Before I forget, I have not yet received any official complaint. I have only heard that there were accidents. But I will ask not only Majlis Bandaran Kerian, but also the Road Transport Department (JPJ) and the Public Works Department (JKR) to study why these occur so often in that area, especially when the Parit Buntar Hospital is officially opened, to ensure that we check all of that before the hospital's opening. Thank you very much.

Speaker

Chenderiang

Encik Choong Shin HengMCA · BNChenderiangEN

Thank you to Dato' Seri Yang di-Pertua. Thank you to the Honourable Exco for giving a good answer to Dun Chenderiang on upgrading the bridge over the Sungai Chenderiang, and for my supplementary question: accidents frequently happen on the Tapah - Cameron Highland road. What are the government's efforts to improve the safety features of the Tapah Cameron Highland road? Thank you.

For that one, I need an inspection by JKR Perak itself. What are our short-term and long-term plans for the road that the Honourable Member just mentioned? So, if it is included, we will try to ensure that the road maintenance ownership is included in our upcoming plans. Insha Allah, I will ask JKR to give its explanation. Thank you.

SpeakerEN

Thank you, Honourable Exco. Now I invite the Honourable Member from the Pengkalan Hulu constituency to state the question number.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

In the name of Allah, the Most Gracious, the Most Merciful. Pengkalan Hulu question number 6. Thank you, Dato' Seri Yang di-Pertua.

Encik Mohd Azlan Helmi bin HelmiPKR · PHTualang SekahEN

Thank you, Honourable Datuk Seri Yang di-Pertua. Assalamualaikum Warahmatullahi Wabarakatuh. Salam Perak Sejahtera 2030, Salam Malaysia MADANI. Thank you also to the Honourable Member for Pengkalan Hulu, who is attentive and has asked questions relating to my portfolio. For the information of the Honourable Member, the National Digital Connectivity Plan, also known as JENDELA, is a main initiative implemented by the Federal Government through the Malaysian Communications and Multimedia Commission (SKMM) throughout the country, including in the Pengkalan Hulu State Constituency, to strengthen digital infrastructure through the provision of high-speed internet and to expand digital connectivity in an inclusive manner. SKMM works with the Perak State Government and service providers to monitor and improve coverage and the quality of communication services, especially in rural and interior areas.

As a continuation of previous initiatives, SKMM is currently in the process of implementing the JENDELA 2 Project at the national level. This project is expected to begin in the third quarter of 2026 and will be completed in stages. The implementation of this project will involve providing two types of solutions, namely public cellular services and 4G or a combination of 4G and 5G where appropriate, or broadband services via satellite. The selection of the type of solution will be determined based on the method of service provision that is suitable, with permission, Fit for Purpose, taking into account factors such as population density, terrain, and the availability of existing infrastructure nearby the site. This approach aims to ensure the provision of comprehensive internet access to populated areas across the country, including in Perak State.

For the information of the Honourable Member, the quality of internet and communication coverage in the area raised by the Honourable Member may be affected by several technical and environmental factors. Among them are network capacity density, distance from transmitter stations, the capability of existing network infrastructure, and environmental factors such as physical obstacles that may affect signal propagation. In addition, acts of vandalism and theft of communication equipment may also cause service disruptions, which in turn affect the quality and continuity of communication coverage, affect the quality and continuity of communication coverage. These factors may cause differences in user experience even though the area already has communication coverage. Regarding complaints, the problems of disruption and instability of internet access for the Pengkalan Hulu State Constituency. In 2025, a total of 24 complaints related to internet services were recorded for the period 1 January 2026 to 31 August 2026. A total of 23 complaints involving 11 locations were received for further action. Following the complaints received, SKMM Perak has conducted tests at all 11 complaint locations in May and August 2026 and is now obtaining technical assessments and action plans from the relevant service providers.

To ensure that network performance is always monitored, SKMM also conducts quality audits across the country, including in Perak State, to ensure that service providers always comply with the mandatory standards on quality of service (MSQoS) set from 1 January 2026 until 31 August 2026. A total of 4, 4 non-compliances have been identified at four locations in the Pengkalan Hulu State Constituency. Notices under subsection 51(2) of the Communications and Multimedia Act 1998 (Act 588) have been served to the service providers involved for action and also for feedback.

The Honourable Member and the public are also advised to channel information on locations experiencing service quality problems through the MCMC NEXUS application. Test results showing download speeds below 10 Mbps consistently will be forwarded to service providers for investigation and resolution. At the same time, SKMM also conducts audits to ensure that improvement measures are implemented appropriately. In addition, we also urge users to channel complaints through the MCMC complaints portal via the complaint web link aduan.mcmc.gov.my regarding any communication service quality problems encountered. Thank you. Dato' Seri Yang di-Pertua.

SpeakerEN

Thank you, Exco. Pengkalan Hulu.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Supplementary question. Thank you to the Honourable Exco for the answer given, and I thank you for the 11 towers that have been built in the Pengkalan Hulu State Constituency under the JENDELA Project. However, what I want to focus on is the existing towers. Old towers that need to be upgraded, which may still use microwave types and need to be upgraded to the new fibre, and my focus is on the telco towers in several villages. Among them is Kampung Pahit, Kampung Pahit Dalam, which needs serious action to be taken by MCMC together with the telco companies. In my record, my office's records, we received complaints from June until August. In June there were ten complaints involving disruptions for 10 days, in July there were 7 complaints recording disruptions for 9 days, and in August there were 5 complaints involving disruptions for 5 days. So, for 3 consecutive months, there have been disruptions to telecommunication towers at Kampung Pahit, which is the focus. So my question to the Honourable Exco is, I praise and appreciate the new towers that have been installed. However, I want to draw the attention of the State Government through MCMC to upgrade the existing towers, and my question is, what are the State Government's steps, or what is the timeframe for resolution and the performance indicators for service providers in addressing each complaint of recurring internet disruption like this? It has happened for almost 3 consecutive months. Also, what action will be taken if the service level fails to be met? What action will be taken against telco companies that fail to comply with the conditions or regulations that have been set, or the SOPs set by MCMC? And can you, Honourable Exco, state the 11 locations of the new towers that have been built in the Pengkalan Hulu State Constituency? Thank you very much.

SpeakerEN

Thank you, Honourable Member. Honourable Exco.

Encik Mohd Azlan Helmi bin HelmiPKR · PHTualang SekahEN

Thank you, Dato' Seri Yang di-Pertua, thank you to my friend from Pengkalan Hulu who is attentive to the telecommunications problems in his area. Here I would like to inform the... For the information of the Honourable Member, there are 11 new communication towers in the Honourable Member's area. The first is Kampung Orang Asli Bukit Asu, second, PPRT Kampung Pahit, third, Kampung Tersusun Bukit Buluh, fourth, Kampung Klian Intan, fifth, Kampung Pahit Luar, sixth, PPMS Tanah Hitam, seventh, Kampung Kuak Luar, eighth, Air Panas, ninth, Bukit Berapit Kastam, tenth, Kampung Baru Tasik and eleventh, Pengkalan Hulu. Later I will give the Honourable Member a written reply and also some information regarding the Kampung Parit Dalam issue as raised by the Honourable Member.

A briefing will be held at the local authority (PBT), District Office of Hulu Perak, on 21 September, which is a Monday, at 10.00 am. The briefing is more about explaining the frequency of coverage disruptions in the village, and this briefing also wants to discuss the mitigation measures currently being drafted, especially by Celcom Digi, for the Honourable Member's information. Among the causes of disruption received from Celcom Digi are that cables were damaged by wild animals, and there were also several incidents, with permission, of multiple fibre cuts, which caused the restoration and resolution of disruptions to take some time. I also want to refer to the Honourable Member's question about the notice... the notice that we issued regarding non-compliance, as I mentioned in the first answer earlier. This notice will be issued under Subsection 51(2) of the Communications and Multimedia Act 1998, Act 588. So, as I mentioned earlier, if download speeds below 10 Mbps are consistently recorded, we will inform the service provider, and if they fail to resolve the problem within the time we have set, we will issue this notice of non-compliance. But regarding the Honourable Member's suggestion just now, on how long the period we set should be, I will take the Honourable Member's suggestion and raise it to the MCMC level so that we can further refine the details on the notice period, and if there is negligence by the service provider in completing and resolving the problem within the stipulated period, we may be able to take action. The State Government will never tolerate anything that will complicate daily activities, especially for the community and the State of Perak. Thank you.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Alor Pongsu.

Speaker

Alor Pongsu

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Thank you, Mr Speaker.

Encik Rahim bin IsmailPAS · PNChangkat JeringEN

Changkat Jering, can Changkat Jering?

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Honourable Exco, first of all, to everyone. I would like to wish a speedy recovery to the father of the Honourable Exco, who is being treated at KPJ. Let us all pray together that he recovers soon. Alor Pongsu does not have a problem like Pengkalan Hulu.

Thank you for the 2 transmitters. But Alor Pongsu wants to ask too. The people demand transmitters at Parit Sungai Dungun, Sungai Bogak, and Parit Lebai Kadir. When will they be built? Secondly, my question, Honourable Exco, are you aware? Regarding the registration of end users, namely the purchase of SIM cards that were newly issued on 26 February 2026 by MCMC. A citizen can buy five SIM cards, a non-citizen can buy 2 SIM cards. Honourable Exco, are you aware? Or do we need to reduce the purchases because scammers nowadays all use handphones. Buying SIM cards as they please. When we report to the police, they refer to MCMC. MCMC then says there are millions of lines. So I want to request, and I want to ask the Honourable Exco and the State Government, can we reduce the purchase rate of SIM cards? Thank you.

Speaker

Sila Exco

Encik Mohd Azlan Helmi bin HelmiPKR · PHTualang SekahEN

Thank you, Honourable Dato' Seri Yang di-Pertua. Thank you to my elder brother from Alor Pongsu who raised the two matters just now. For the first one, which was asked of me about the transmitters, for this one, Honourable Member, I will ask MCMC to prepare the list and we will give it to the Honourable Member. For the second one, on the suggestion made by the Honourable Member for Alor Pongsu about these SIM cards, we are aware of this matter and we will deliberate on the good suggestion. In my view, there is a need for the government to address this, but from the context of the Perak State Government, we accept this suggestion. We will raise it to the MCMC level and also to the ministry to ask them to deliberate. If this can be used by scammers, of course we from the Perak State Government will not agree and we will ask for it to be further deliberated. At the ministerial level in particular, we will bring the discussion to the MCMC level as well. Thank you, Dato' Seri Yang di-Pertua.

Speaker

Simpang Pulai.

Encik Rahim bin IsmailPAS · PNChangkat JeringEN

If possible, one more, can?

SpeakerEN

Changkat Jering, wait a moment, Simpang Pulai.

Cik Wong Chai YiPKR · PHSimpang PulaiEN

Thank you. Simpang Pulai would like to ask, earlier the Honourable EXCO mentioned the MCMC NEXUS application. I would like to know what the benefits are of using this application, and also the data collected by this application? How can it help to identify and improve coverage and service quality, and how many users are there to use this application in Perak State?

Encik Mohd Azlan Helmi bin HelmiPKR · PHTualang SekahEN

Thank you, Dato' Seri Yang di-Pertua. Thank you to my younger sibling from Simpang Pulai who is attentive. For the information of the Honourable Member, the use of the MCMC NEXUS application provides benefits to the public because it enables the performance and quality of internet networks at a location to be tested in real time, including download speed, upload speed, ping, and jitter. With permission. Data collected from this application can help MCMC and service providers to identify areas with coverage or service quality problems more accurately, thereby enabling improvement measures to be implemented in a more targeted manner. Accordingly, the public is encouraged to use MCMC NEXUS, especially by conducting tests in areas experiencing problems with internet application access. Every test conducted contributes to a more comprehensive data collection and helps the relevant parties obtain a true picture of network conditions in an area. Indirectly, the community also plays a role in joint efforts to improve the quality of the nation's telecommunications services.

For the information of the Honourable Member, the State Government has also conducted a briefing on the NEXUS application on 21 April 2026 for all ADUN special officers as well as the Menteri Besar's special officers. This briefing aims to provide exposure and understanding to the officers regarding the functions and methods of using the NEXUS application in helping to streamline information management, especially regarding issues and complaints received from the people, and regarding the Honourable Member's question about the usage data of NEXUS. How many people have used NEXUS in Perak State? So I will raise the Honourable Member's question, and we will ask MCMC to obtain data at the MCMC level, federal HQ, so that we can conduct more awareness about this. Moreover, this NEXUS briefing at the State Government level, we will continue so that more people, not only special officers and MB officers, our Honourable Members' special officers, we will continue at the level of community leaders and also the community in general, so that they can use it and so on. From the results of the use of NEXUS, we use them for planning and overcoming access problems experienced in certain areas, especially in Perak State. Thank you, Dato' Seri Yang di-Pertua.

Encik Rahim bin IsmailPAS · PNChangkat JeringEN

Perhaps Changkat Jering, just a little bit.

SpeakerEN

Honourable Exco, Changkat Jering…

Encik Rahim bin IsmailPAS · PNChangkat JeringEN

Perhaps Changkat Jering, just a little?

SpeakerEN

He is a former Telekom officer. He very much pleads to ask his last question, can he? Okay, Changkat Jering may, this is the last one, really the last.

Encik Rahim bin IsmailPAS · PNChangkat JeringEN

Okay. Assalamualaikum Warahmatullahi Wabarakatuh. Thank you, Dato' Seri Speaker, and thank you, Exco, for giving me the opportunity. My question, just like Pengkalan Hulu, disruptions are still occurring in Changkat Jering. However, I want to ask up to today, how is the automatic follower system used? The automatic follower, with permission. That is the Multi One Multi Networks Follower, which is a broadband system that can Auto Switch. Auto Switch, for example, from Celcom or Celcom Digi. When Celcom Digi fails, it will automatically go to another telco company. So far, if possible, can you give what percentage has been used so far, and when the main route is restored, will Celcom return to the original system? Thank you.

Encik Mohd Azlan Helmi bin HelmiPKR · PHTualang SekahEN

Thank you, Dato' Seri Yang di-Pertua, thank you to the Honourable Member, my elder brother from Changkat Jering, who asked about this matter just now. So, I ask MCMC, which is here, to address the technical reasons. We may obtain it in writing and we will convey it. Perhaps there could also be discussions with the Honourable Member about the matters mentioned just now. Thank you, Honourable Member.

SpeakerEN

Thank you, Honourable Exco, thank you to all Honourable Members. With this, the oral question session for today is concluded. I invite the Secretary of the House to read the next order of the meeting.

Motion which has been given notice motion on the election of Members of the Dewan NegaraMotion

SecretaryEN

Item four, the motion for which notice has been given, on the selection of Members of the Dewan Negara.

SpeakerEN

I now invite the Right Honourable Menteri Besar to move the motion.

Dato’ Seri Saarani bin MohamadUMNO · BNMenteri Besar · Kota TampanEN

Dato' Seri Yang di-Pertua, I respectfully seek permission to move the motion that reads: the election of Members of the Dewan Negara (Senate). Dato' Seri Yang di-Pertua, pursuant to Article 45(1)(A) of the Federal Constitution, a vacancy has arisen in the Dewan Negara (Senate) for a member elected by the Perak State Legislative Assembly (Dewan Negeri Perak), as his term of office ended on 24 May 2026. Accordingly, I respectfully move that the State Assembly may hold the election of a Member of the Dewan Negara (Senate) today. Thank you.

Speaker

Ada sokongan?

Dato' Seri Yang di-Pertua. Teja seconds.

SpeakerEN

Under the Seventh Schedule of the Federal Constitution, once all nominations have been received, the returning officer shall announce the names of the nominated persons in alphabetical order and then shall put their names to the vote in that order. I now invite the first candidate, Encik Mohamad Hairul Amir bin Sabri, to come forward. May the proposer, Encik Mohamad Hairul Amir, please proceed. May the proposer of Encik Mohamad Hairul Amir bin Sabri please put forward the proposal and introduce the candidate to this honourable House.

Greetings of Peace, Malaysia Madani Greetings and Perak Sejahtera 2030 Greetings. The Honourable Dato' Seri Yang di-Pertua, allow me to introduce a young figure, a true son of Perak, who has been proposed as a candidate for Member of the Dewan Negara (Senate), namely Saudara Mohamad Hairul Amir bin Sabri. He was born in Tambun, Ipoh, and is now 38 years old. He received his higher education at Universiti Sains Malaysia (USM) in political science. He currently serves as Chief Special Officer at the Office of the Member of Parliament for Tambun, which is also the office of the Right Honourable Prime Minister of Malaysia. This experience has given him direct exposure to administrative matters, policy, and the affairs of the people, particularly at the level of Parliament and the Federal Government.

In addition, he has been entrusted to serve as a Member of the Board of Directors of the Perak Water Board (Lembaga Air Perak), as well as a Member of the Audit Committee, independent and non-executive, of Kanger International Berhad. In the political field, he is currently Chairman of Parti Keadilan Rakyat Perak State Division. He has held this post from 2024 until now. In that capacity, he continues to play a role in strengthening the party organisation, while reaching out to the people and carrying the voice of the people of Perak.

From Perak he carries the voice, Upholding the trust with full loyalty, From the state to the Dewan Negara, The voice of the people continues to be carried.

Therefore, I respectfully introduce and put forward Saudara Mohamad Hairul Amir bin Sabri as a candidate for Member of the Dewan Negara (Senate), whom we hope will provide the best service in carrying the voice of the people of Perak and fighting for the interests of the state at the level of the Dewan Negara (Senate). That is all, thank you.

SpeakerEN

Thank you, the Honourable Exco Member from Teja. Is there a seconder?

Dato' Seri Yang di-Pertua, Lintang seconds.

SpeakerEN

Thank you. Thank you. I now invite the second candidate, Encik Muhamad Zulkifli bin Mohamad Zakaria, to come forward. May the proposer of Encik Muhamad Zulkifli bin Mohamad Zakaria please put forward the proposal and introduce the candidate to this honourable House.

Assalamualaikum Warahmatullah Wabarakatuh. Dato' Seri Speaker, Yang di-Pertua of the House, the Honourable Menteri Besar and the Exco line-up, and the Government and the Opposition. In a mature political climate. I propose, on behalf of the Opposition, the Honourable Al-Fadhil Ustaz Muhamad Zulkifli bin Mohamad Zakaria, who is in front of you all at this moment. He was born on 17 September 1969, in Kampung Pengkalan Ikan, Kuak, Kuala Kangsar, Perak. He began his education at Sekolah Rendah Kebangsaan Raban, Kuak, before continuing his studies at Madrasah Misbah Al-Falah, Parit Panjang, Baling, Kedah. His love of knowledge later led him to further his studies overseas, at several places abroad, including Ma'ahad Salman Al-Farisi, Peshawar, Ma'ahad Imam Abu Hanifah, Peshawar, and the International Islamic University Islamabad, Pakistan. In the fields of education and da'wah, he has very broad experience. He has served as Deputy Mudir of Madrasah Nurul Hidayah, Kuala Ketil, Kedah, and as Deputy Principal of Ismu Tarbiah Waal Imamah, or Qiam, Seri Manjung. He has also been a lecturer at the Akademi Pengajian Islam dan Dakwah Seri Manjung since 2008.

To date, he holds the responsibility of Principal of Maahad Tahfiz Al-Quran Dar Abrar, Seri Manjung, and he is also an adviser to Ma'had Tahfiz Zawiyah Shafie, Sungai Buloh, Selangor, and Pondok Dakwah Dar Abrar, Teluk Senangin, Lumut. In the community sphere, Al-Fadhil Ustaz Muhamad Zulkifli bin Mohamad Zakaria is the Secretary of Badan Kebajikan Pembangunan Insan Muslim Perak and Deputy Chairman of Pertubuhan Kebajikan Al Abrar Malaysia, or Abrar Care Malaysia. He is also a former member of the ulama under the Perak State Government's Mufti Department. His commitment to welfare work is also evident when he has joined humanitarian missions at home and abroad in several countries, and is also active at home in helping the community.

In humanitarian missions. In politics, he has held important responsibilities and trusts. Among them: Deputy Head of Dewan Pemuda PAS Lumut Division, Head of Dewan Pemuda PAS Lumut Division, Director of Publicity of Dewan Ulama PAS Perak State, Deputy Head of Dewan Ulama PAS Perak State, Head of the Institute of Leadership Training and Islamic Da'wah Presence, or Ilham, Perak State, and Member of the Central Dewan Ulama PAS Committee. He has also been entrusted to represent PAS as a candidate for the Lenggong Parliamentary seat in the 12th General Election and the Tambun Parliamentary seat in the 14th General Election. Since 2009, and since 2019 until now, he has been entrusted as Head of Dewan Ulama PAS Perak State, and he is also a Member of the Central Dewan Ulama PAS Committee as well as Deputy Director of the Election Department, Dewan Ulama PAS Malaysia. Indeed, Insha Allah, with his wide experience in education, da'wah, welfare, community affairs and politics, he is a figure who is respected and esteemed, and Insha Allah can carry our voice to the Dewan Negara (Senate). That is all, assalamualaikum wbt.

SpeakerEN

Waalaikumsaalam wbt. Thank you, thank you, the Honourable Member from Manjoi. Is there a seconder?

Dato’ Zainol Fadzi bin PaharudinBERSATU · PNSungai ManikEN

Sungai Manik seconds.

SpeakerEN

Thank you, the Honourable Member from Sungai Manik. Honourable Members, since there are two nominations, I will conduct the vote by ballot paper. This is how it goes, yes. I have the ballot paper in my hand. Shortly, the House secretariat and House staff will distribute these ballot papers. There are two names, as with our candidates just now, on this ballot paper. I ask Honourable Members to vote. Place a tick next to the box on the side. Then there is a space for a signature, or at least initials, on this paper to indicate that this is a valid ballot paper. Then you may fold it, and at the same time House staff will also bring the ballot box so that you can put your ballot paper into the ballot box. Okay, now I respectfully ask the House staff to distribute the ballot papers...

Tuan Haji Razman bin ZakariaPAS · PNGunong SemanggolEN

Is there a candidate's representative to count the votes?

SpeakerEN

Yes, yes. Then, that is later. Thank you, Semanggol. I respectfully ask the House staff to distribute the ballot papers to the Honourable Members. Did they have the ballot box earlier? Secretary of the House, where is it? Can you show me the ballot box, here is the ballot box.

[POSTAL VOTING IN PROGRESS]

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

Dato' Speaker, ballot papers have never had to be signed.

SpeakerEN

This is indeed the postal voting rule, which is in our Standing Orders.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Dalam, dalam.

SpeakerEN

It does happen sometimes.

Encik Noor Azman bin GhazaliBERSATU · PNAlor PongsuEN

I thought it was the same as the Election Commission (SPR).

SpeakerEN

You may sign or initial, it is up to you how you sign. This is indeed practice in the House. It is stated in the Standing Orders. Okay. Thank you.

Datuk Azman bin NohUMNO · BNPengkalan BaharuEN

Dato' Seri Yang di-Pertua, can I get one more form? Another ballot paper. I ticked both wrongly.

Encik Mohamad Amin bin RoslanPAS · PNPengkalan HuluEN

Pengkalan Baharu, what is this about voting for both?

Puan Wong May IngDAP · PHPantai RemisEN

Their signature has already gone into the box.

Encik Noor Azman bin GhazaliBERSATU · PNAlor Pongsu

Undi rosak.

SpeakerEN

That is fine if it is clear what the intention is in voting with that tick. If, if it is not a tick for both, we will consider it later. Yes.

Encik Ong Boon PiowDAP · PHBerchamEN

Dato' Seri Speaker, we need one counting agent, right? You go, I nominate Simpang Pulai to be the counting agent on the government's side.

SpeakerEN

A representative from the government side has been requested just now, and the government has nominated the State Assemblyman for Simpang Pulai as its representative. The opposition? Is there a representative to count the votes or not?

The Honourable Member Tuan Haji Razman bin Zakaria (Kamunting) Kamunting.

SpeakerEN

Kamunting? Okay, please, both Honourable Members come to the front. Honourable Members all. After the voting has been conducted, here is the result. The motion for the election of Members of the Dewan Negara (Senate). The number of ballot papers issued was 59. The number of ballot papers returned was 59. The number who voted was 59. The votes received are as follows: Encik Mohamad Hairul Amir bin Sabri, 33 votes, and Encik Muhamad Zulkifli bin Mohamad Zakaria, 26 votes. The number of spoilt votes was 0. Therefore, I announce that Encik Mohamad Hairul Amir bin Sabri has been elected as the representative of the Dewan Negara (Senate) for the Perak State Legislative Assembly (Dewan Negeri Perak).

Two siblings, is it?

SpeakerEN

For the information of all, the names of the Members of the Dewan Negara (Senate) who have been elected will be submitted as soon as possible to the Office of the Secretary of the Dewan Negara (Senate), for the purpose of carrying out further appointment procedures, which will be managed and completed by the Secretariat of the Dewan Negara (Senate), Parliament of Malaysia. Menteri Besar.

Dato’ Seri Saarani bin MohamadUMNO · BNMenteri Besar · Kota TampanEN

Dato' Seri Yang di-Pertua, I respectfully seek permission to propose that this House be adjourned to an indefinite date.

Speaker

Ada sokongan?

Lintang menyokong.

SpeakerEN

Honourable Members, the Honourable Menteri Besar has proposed that this House be adjourned to an indefinite date, and it has already received a seconder. Therefore, I hereby adjourn this House to a date that will be announced later. The House is adjourned.