Sabah · 24 May 2023
16th Assembly, 4th session, 1st meeting · not final · 746 turns · 53,690 words · official PDF ↗ · Digital Hansard ↗
ExperimentalSabah's own site lists 22 sitting days; 35 more of the 16th Assembly are recovered from the Wayback Machine, and some are missing. Appointed members are not in the election register. Written answers are not published.
Oral QuestionsQuestions
Questions for oral answer.
With respect, I invite the ADUN Dilantik Datuk Seri Panglima Yong Teck Lee.
Thank you, Mr Speaker. Word number one.
Silakan menteri.
Oral Questions — Solar Energy in SabahQuestions
*1.
Honourable Datuk Seri Panglima Yong Teck Lee [ADUN Dilantik] asked the CHIEF MINISTER how many megawatts (MW) of energy are currently being generated from solar power in Sabah, and what is the target solar power energy required in Sabah. Answer
Datuk Speaker, for the information of the Honourable Members of the ADUN Dilantik and of this august House, the current solar energy capacity in Sabah is 84 megawatts, comprising:
1.
Large-scale solar projects, namely solar projects with a capacity exceeding one megawatt, totalling 50 megawatts, which have been in operation since 2018 in Kudat; 2.
Photovoltaic (PV) solar projects under the Feed-in Tariff scheme with a capacity of one megawatt and below, namely 796 installations of individual, commercial and community types totalling 34 megawatts. Meanwhile, the capacity of large-scale solar that is currently being implemented is 62 megawatts and is expected to be completed in 2024. The locations of these large-scale solar projects being implemented are as follows:-
1.
One project in Beaufort with a capacity of six megawatts; 2.
One project in Kunak with a capacity of five megawatts; 3.
Two projects in Sandakan with a total capacity of 20 megawatts; 4.
Three projects in Tawau with a total capacity of 16 megawatts; and 5.
Two projects in Labuan with a capacity of 15 megawatts.
Therefore, the total amount of solar energy that has been and will be operational in the Sabah grid is approximately 146 megawatts, or 11% of the total generating capacity of the entire Sabah grid. According to information from the Malaysia Renewable Energy Roadmap, or MyRER, the Malaysia Renewable Energy Roadmap, which was drawn up by the Sustainable Energy Development Authority (SEDA). In 2021, the solar potential in the state of Sabah is the best in Malaysia, namely 99,400 megawatts. If…
…it is based only on the total area of all undeveloped land, namely 1,887 square kilometres or approximately 2.6% of the total land area of the state of Sabah. The land area of the state of Sabah is 72,500 square kilometres. For ground-mounted solar installations, or ground mounted type. However, practically speaking, if a small portion of that land area is developed as a solar farm, for example 1% of the 1,887 square kilometres, namely approximately 19 square kilometres or 4,600 acres, it could produce solar energy of approximately 1,000 megawatts. However, to ensure the stability of the Sabah grid, the lowest capacity of solar that can be connected and supplied to the Sabah grid is limited to 22% of the maximum demand of the grid system, namely limited to only 220 megawatts at this time. This is because solar power is inconsistent and depends on sunlight conditions. Therefore, the targeted additional solar energy capacity planned by the State Government in the future is limited, namely approximately 100 megawatts up to the year 2027.
However, the solar energy capacity supplied to the state electricity grid of Sabah can be increased further if battery energy storage system technology is combined with solar energy technology, when this technology matures and becomes competitive in future. Given the capacity limits as explained, and to enable as much solar energy as possible to be developed at this time without causing negative impacts. Thus, the State Government of Sabah, through the Energy Commission of Sabah (ECoS), a state statutory body that will take over the regulatory power over electricity supply, including renewable energy, from the Federal Government at the end of this year, will also evaluate the implementation of solar energy projects that are not connected to the state electricity grid of Sabah, such as self-generated energy use and specific supply to industrial parks and so on. In short, the state government is aware of the potential benefits of solar energy as a renewable and environmentally friendly energy with high potential in this state. Apart from focusing on environmental sustainability, the government is also caring and responsible in ensuring that the supply of electrical energy to consumers in Sabah is secured in terms of supply security and implemented at the maximum cost so as not to burden the people of this state. Thank you.
Supplementary questions? Supplementary questions.
Thank you, Mr Speaker. Thank you to the Honourable Minister for the comprehensive answer, and I am very pleased to hear that progress in the renewable energy sector is developing, and I agree that in terms of energy security, solar energy is an important field for Sabah. Supplementary question. So that solar energy or renewable energy can continue to develop in Sabah, what incentives and encouraging policies will the government provide to the renewable energy sector, especially this solar energy? Thank you.
Please, the Minister, answer.
Datuk Speaker, to answer the supplementary question of the ADUN Dilantik and this august House. Large-scale solar projects, or large scale solar plans, are conceptualised as IPPs (Independent Power Producers), where SESB and the IPPs sign Power Purchase Agreements, or PPAs, for the purchase of energy. Therefore, the State Government, through the Energy Commission of Sabah (ECoS), intends to implement the construction for the development of large-scale solar projects totalling 100 megawatts in phases after taking over the regulatory power over electricity supply in due course. Investors may apply for incentives available from the Federal Government, such as the Green Investment Tax Allowance (GITA) and the Green Investment Tax Exemption for project developers managed by the Malaysian Investment Development Authority (MIDA). And secondly, incentives under the Green Technology Financing Scheme GTFS 3.0 for project developers managed by Green Tech Malaysia or Danajamin, under the Development Bank.
The State Government will consider providing new incentives and encouragement in future based on needs after the takeover of the regulatory power over renewable energy by the Sabah State Government is fully implemented. Thank you.
Okay, Sekong. Supplementary question.
Thank you, Mr Speaker. Honourable Minister, I would like to ask, what is the status of the solar energy project on Pulau Tronglit in Sekong? Thank you.
Sorry Speaker, which island?
Pulau Tronglit.
Pulau Tronglit.
Pulau Tronglit, in the Sekong state constituency.
Okay, ah, since I do not have information on the current status, Insya-Allah we will provide a written answer to the Honourable ADUN Sekong. Thank you.
I am only giving two supplementary questions, but since the Leader of the Opposition wants to ask, I will allow it. This is the last one.
Minta izin.
Silakan.
Thank you, Mr Speaker, thank you for the opportunity given, and having heard the answer given by the Assistant Minister just now regarding ECoS, I would like to ask the Honourable Member: how can we implement it when even the Electricity Supply Enactment does not exist? There is none yet. How can you enforce that, firstly.
Secondly, has the government studied comprehensively and in total the conditions across the land of Sabah? Comprehensive study, namely land below the wind. Not all areas in Sabah can get sunlight, because when we are in Kudat, there are times even on that island. Sometimes there is no sunlight. Then…
Honourable Senallang, so what is your question?
My question is, I said was there any comprehensive study on where the side first thing is that bagaimana enforcement of blow since there is no enactment or electric supply enactment is not there. So, how can you enforce the law? The second part, I asked earlier about the situation that we say, what is it called, comprehensive study and which areas we do not want leakage.
Our national expenditure is high, but sometimes in the past, when I was in Sarawak, there were certain places that wasted it. Thirdly, on the islands. For example, in Larapan, after I had given seven islands solar under KKLW. But, I trained the local boys, SPM graduates, so that there is no maintenance because the State Government has no one to train, where are their technicians? So if something is disrupted by a blackout, they can restore it. Are the government agencies taking this step?
Thank you, thank you. Honourable Senallang. Honourable Minister, if you cannot answer, because there is a lot of data, you may submit a written question.
Thank you for the, ah, supplementary question from the Leader of the Opposition.
I understand, and the State Government also understands the concern raised by the Honourable ADUN Senallang regarding our preparations for the imposition of the Sabah State ST, as the Honourable ADUN has just stated, namely whether we are ready when we do not yet have the resources, yes, as everyone is aware. That is why the State Government under the leadership of the Honourable Datuk Seri Panglima Sulaman has made efforts to negotiate with the relevant ministries in the Peninsula to take over this Commission so that we can better understand the current needs in the State of Sabah.
Therefore, as the Honourable ADUN Senallang raised earlier, we will take all these views and, Insya-Allah, we will endeavour to do our best through eko sini to ensure the supply of gas and electricity now. Gas supply first, then electricity supply so that the best can be provided to all the people of the State of Sabah.
Thank you, Minister.
Terima Kasih.
Now I invite the Honourable Bongawan.
Mr Speaker, I would like to answer the question from the ADUN Senallang. Currently, when we approve every electricity supply application, we refer to the ST at the Electricity Commission at the Federal level. So, they are the ones who approve any application we have made up to today.
Until we take over this Electricity Commission on 1 Januari 2004. Only then will the State Government have the power to determine the tariff policy and also the approval of applications that have been applied for, but until today all our applications are submitted to the Electricity Commission in Kuala Lumpur and this is the result that has been approved.
The existing proposal to enable the State Government to have jurisdiction is not based on applications, it is not about supply. There must be a law in the state, preparation to be done before you acquire the facility, so that the enactment can control the rate and its collection. When do you think this enactment can be passed?
So that enactment, the proposal is that we will table it in the State Legislative Assembly sitting before the end of this year. Thank you.
Thank you, Honourable Sulaman. Now I invite the Honourable Bongawan.
Thank you, Mr Speaker. My second question.
Silakan Menteri.
Oral Questions — Production of Ruminant Meat and Production of Dairy Cattle Milk in the State of SabahQuestions
3.
Honourable Dr. Daud bin Yusof [Bongawan] asked the DEPUTY CHIEF MINISTER I / MINISTER OF AGRICULTURE, FISHERIES AND FOOD INDUSTRY SABAH: a) what is the percentage level of self-sufficiency (SSL) for the production of ruminant meat and dairy cattle milk production in the state of Sabah; and b) what is the ministry's long-term plan to reduce dependence on imports of livestock products from abroad. Answer
Answer to question A. Mr Speaker, for the information of the Honourable Member for N30 Bongawan and this august House, the SSL self-sufficiency level for 2022 for ruminant meat production is 5.26%. This SSL percentage rate increased by 2.32% compared to 2.94% in 2021. This increase is contributed by the implementation of the ruminant empowerment programme in Sabah, the smart livestock integration project and the goat entrepreneur development programme. Under these programmes, a total of 797 imported female cattle, 40 superior bull cattle, 1,010 meat goats and imported sheep, 200 katjang goats and 60 bali cattle have been distributed to 50 participants, comprising three government-linked agencies, GLCs, and 48 others to semi-commercial and small breeders throughout Sabah for 2022.
In addition, to ensure continuous breeding of ruminant livestock and an adequate meat supply, the DVS has enforced a prohibition on slaughtering female cattle, buffaloes, goats or sheep in 2021, and a prohibition on the export of female ruminant livestock on 4 April 2022.
Meanwhile, the SSL for milk production was 106.58% in 2022. This rate decreased from 117.02% in 2020 and 115.63% in 2021. The declining SSL rate is due to the operating costs of livestock farming that continue to increase due to rising raw material costs for animal feed such as corn and soya at the global level.
In addition, the availability of livestock feed and logistics is also an issue. High additional labour costs indirectly increase farm operating costs. Meanwhile, the increase in population and the increase in the number of domestic and foreign tourists also contributed to the increase in demand for fresh milk.
However, Sabah's involvement in the Borneo Dairy Valley is expected to again increase the SSL with the procurement of 1,500 dairy cattle and various plans to find alternative locally produced animal feed.
Answer to question B, for the information of this august House, the annual average meat requirement is 16,800 metric tonnes, equivalent to 60,000 beef cattle slaughtered. The current beef cattle population is only 43,410 and, taking into account an extraction and mortality rate of 10%, Sabah needs to have 600,000 cattle before it can stop any intervention in the import of livestock products. This requirement will increase in line with the growth of Sabah's population.
Therefore, my ministry, through the Veterinary Services Department (DVS) Sabah, has made 5 long-term plans to reduce dependence on imports of livestock products from abroad.
First, to increase the SSL self-sufficiency level of fresh meat supply in line with the national food security initiative through cattle farming under feedlot. DVS Sabah has collaborated with a GLC company to increase the population from 14,000 to 35,000 by 2028. The GLC will also drive a sustainable cattle business by establishing fodder crops to provide feed at lower cost for the cattle.
Second, strengthening the integrated farming programme under oil palm. Under this programme, DVS Sabah will distribute 840 beef cattle, 1,050 meat goats and 320 sheep annually from 2021 to 2025. DVS Sabah together with two GLCs, 15 large entrepreneurs who have more than 50 cattle, and 123 small entrepreneurs who have fewer than 50 cattle will continue to intensify breeding activities and thereby increase the population rate..
… of livestock from 30 thousand to 90 thousand by 2030.
Third, participation in the Borneo Dairy Valley Programme is an effort to optimise the production of ruminant livestock for milk and meat. Two GLCs are participants in this programme and will carry out the procurement of 1,500 dairy cattle in 2023. Dairy cattle contribute 30% of the fresh meat supply in the local market.
Fourth, in addition, to support efforts to improve breeding stock more effectively, the government has 18 ruminant breeding farms throughout Sabah. Therefore, farmers do not need to depend on obtaining breeding stock from abroad.
Fifth, in addition, the DVS Keningau biotechnology centre will continue to actively implement the Artificial Insemination Programme to increase breeding efficiency, improve livestock genetics and prevent the spread of disease. DVS Sabah has supplied a total of 2,833 semen straws in 2022, 1,871 semen straws in 2021, and 1,071 semen straws in 2020 to GLCs and local farmers. Superior semen from cattle and buffalo is produced for supply and sale to farmers, four selected farmers. Thank you. Thank you.
Supplementary question, Honourable Bongawan? If there is none, I will move on and invite the ADUN Dilantik, Datuk Amisah Yasin. Please proceed. (inaudible) Ah, not working?
Question number three.
Silakan menteri.
Oral Questions — Status of Construction of Dusun Ethnic Culture and Arts Museum in RanauQuestions
*3.
Honourable Datuk Amisah Yassin [ADUN Dilantik] asked the MINISTER OF TOURISM, CULTURE AND ENVIRONMENT, what is the status of the construction of the Dusun Ethnic Cultural and Arts Museum in Ranau, given that the site opening ceremony was held several years ago.
Supplementary question, Honourable Nabawan? Any? Supplementary question.
Thank you, Datuk Speaker, thank you, Honourable Minister. How many new towns have been built so far and are also planned for construction by the Ministry, and is the Pagalungan Small Town included in such plans? Thank you, Datuk Speaker.
Thank you. Supplementary question from Nabawan. Until today, how many existing projects have been implemented for the existing new towns: 22 towns, with 34 currently being implemented and 14 to be implemented, so the total is 22 projects. 22 existing projects, 34 currently being implemented and 14 that we are planning. As for Pagalungan, I think we are also in the planning process. Thank you, Honourable Member. Thank you, Datuk Speaker.
Yang saya nampak di sini Sungai Manila.
Ya.
Silakan Sungai Manila.
I just want an explanation because in Sandakan there is an education hub, which I think is suitable and appropriate to be made into a new town that could become an icon for Sandakan and also for the State of Sabah. Does the Ministry have plans to include this area as one of the towns, 72 if I am not mistaken, that are to be developed?
Thank you, Datuk Speaker, for answering the supplementary question of the Honourable Sungai Manila. For the time being, the Sungai Manila New Town Project is being, we are being, we are implementing it, Sungai Manila. Thank you, Datuk Speaker.
Thank you, Minister. Now, with all due respect, I invite the Honourable YB Elopura.
Mr Speaker, my question number 6?
Thank you.
Oral Questions — Plantation industry still faces labour shortagesQuestions
*6.
YB. Tuan Calvin Chong Ket Kiun [Elopura] asked the MINISTER OF FINANCE why the government still imposes a 7.5% tax even though the plantation industry is still facing a shortage of workers.
Minister, please. Answer
Thank you, thank you, Mr Speaker. Mr Speaker, as question number six from the Honourable Member for Elopura and question number 31 from the Honourable Member for Senallang relate to taxation on the Palm Oil Industry, I will answer these questions together. For the information of the Honourable Member for Elopura and Senallang, as well as this August House, profit tax is indeed collected by the Federal Government.
Therefore, so that the State Government of Sabah can also directly enjoy the spillover benefits of the Palm Oil Industry, which is one of the main pillars of the state's economy, starting in 1999 the State Government imposed a state sales tax on crude palm oil, also known as CPO.
Up to 2022, the collection of this sales tax has contributed a total of RM19.25 billion to state revenue over the 23 years it has been implemented. For 2022 alone, the sales tax collection amounted to RM1.57 billion, contributing almost 23% to state revenue. Therefore, the state sales tax collection on crude palm oil is a very important source of state income. This financial source makes a very significant contribution in supporting the state budget agenda, including, in particular, financing various physical development and economic and social infrastructure for the welfare of the people of Sabah as a whole. Therefore, the State Government's position is to maintain the imposition of this tax. Mr Speaker, based on information received from the Malaysian Palm Oil Board (MPOB), so far the State of Sabah has 132 palm oil processing mills and 14 refineries. Sandakan district in particular has the largest number of mills in the state, namely 66 processing mills and 4 refineries, while Keningau district has 4 processing mills.
In 2022, the palm oil mill sector provided employment to 5,869 workers at processing mills and 631 workers at refineries. Of this total, local citizens obtained 1,789 jobs, or 30.4%, at processing mills, and 626 jobs, or 98.9%, at refineries. Thus, the reality is that the construction of processing mills and refineries has brought a positive local economic impact, with more productive use of land, development of infrastructure and provision of job opportunities for local residents who are able to generate and increase their income. Meanwhile, the multiplier effects can be enjoyed by other economic sectors
such as the retail sector and the property sector, with increasing domestic demand for goods and services.
Mr Speaker, the State Government has established the Palm Oil Industrial Cluster (POIC) in Sandakan, operated by Sawit Pump Oil Industrial Cluster Sdn. Bhd., a subsidiary of Sawit Kinabalu Sdn. Bhd. Apart from palm oil-based industries, food-based manufacturing and processing industries and commercial development are also planned and invited to conduct business and manufacturing at POIC Sandakan. So far, the industries that have been established and are operating at POIC Sandakan are bulk storage tanks, a parking facility, a Palm Jetty and warehouse facilities, which have provided job opportunities to local citizens.
In addition, the Palm Jetty, POIC Sandakan, has been upgraded to a jetty with port status.
This effort will directly further boost the shipping industry for logistics and transportation of products domestically and abroad.
Furthermore, in efforts to develop POIC Sandakan, basic infrastructure such as electricity supply and water supply will be enhanced and upgraded, and Petroleum gas supply will be established to attract other industries to conduct business and manufacturing at POIC Sandakan. With these efforts and the involvement of the government and the private sector itself, it can indirectly make a significant economic contribution and contribute to economic growth not only in Sandakan but throughout the State of Sabah. Indeed, the State Government is always committed and will redouble efforts to ensure that the benefits of the palm oil industry can support development aspirations.
…so that it can continue to be enjoyed by the people of Sabah. Thank you.
Supplementary question, Honourable Member.
Supplementary question
Thank you, the Assistant Minister who answered, ah, we already knew the earlier answer. Ah, now our question is how to solve the workers' problem even though we have MPARK, MPOA, MPOC. Previously the yield was three rounds of fruit harvesting a month, now it is one and a half, almost one and a half months for one round only. So, how to solve the workers' problem in Sabah? Although the Assistant Minister just said this is the second largest revenue from the contribution of DDP in Sabah, we are not at all, we do not care about what hardship, what suffering there is now in East Coast, all of those from palm oil. Second, when we already know there are 122 palm oil [mills], 14 refineries, we already know, until today we are still discussing, the Assistant Minister had discussed solar. We have BIOGAS, we have BIOMASS. Why is there so much revenue from palm oil? The prices from MPOB's price index are the lowest, compared with Sarawak which has only 5% sales tax, Sabah 7.5% sales tax. Nobody cares about BIOGAS, BIOMASS. I don't know about solar in Sandakan, 20 megawatts, I also don't know. Maybe there is a place like a golf hut that has an offendant, that's it. Maybe I am included in his figures, until today the palm oil mill has only three outputs, one is crude oil. Just now, ah, the Assistant Minister mentioned kernel, the chief has income.
Third, if it has BIOGAS and BIOMASS, it has a type of sale, it sells in Malaysia but with more revenue.
Honourable Elopura, summarise the earlier question, how many questions?
The third one, yes that... the first worker, second 7.5 sales tax. Does it contribute to BIOGAS or BIOMASS, or add revenue for the 120 or 14 mills at these refineries? Thank you.
Thank you, Honourable Elopura. Can the Minister see?
Thank you, Honourable Member. First, please forgive me if my voice is a bit, I have just come out of hospital, so..
Firstly, the tax imposed is not a fixed tax. High production, you pay high CGA; low production, you pay low. It means the labour shortage, although it is a big problem, but the CGA tax paid will also fall proportionately in what is "if production is small". So, I think that is the explanation. Secondly, we need, people say revenue or better returns from this palm oil industry. I see this from the question raised by Senallang. I must, we should find a way how we expand our base, our revenue base, because most of these large palm oil plantations are owned by companies listed on Bursa Malaysia in Kuala Lumpur.
What other paying us tax declared in Kuala Lumpur, so it means income tax is paid in Kuala Lumpur, we do nothing. As for the Honourable Member from Elopura, I understand, but with permission I think we should be nationalistic as Sabahans. We provide the land and as you only, is only, what we should get the revenue too from the land we give to others. If we give everything to the entrepreneurs, there will be nobody left in Sabah. No, please sit down, I will give you time. We want them to profit, we also profit, ah, that is what we should practise. But at the same time we must not take any action that disrupts the domestic investment climate. We want the.. we want to be stable.
Secondly, regarding the MT fruit branch, there must be self-regulation, regulation among the industry itself. The problem now is people don't, BIOMASS does not happen because people, or millers, do not want to sell to BIOMASS mills. They would rather export, because they get a higher price if they give it
to BIOMASS mills. And that is why it is appropriate if we look at POIC here, in Lahad Datu, until now people have invested tens of millions to build BIOMASS mills, but have had to not do anything because nobody wants to sell the MT fruit branch... because if they export, the price is better than if they sell to any local company.
Honourable Member, Honourable Member, please sit down.
Datuk, so if I may conclude, I appreciate and am also concerned about the workers' problem. But it's two separate things, two different matters. The employment matter should be handled by other agencies, but our job is to ensure that under any circumstances, Sabah does not lose out from the palm oil industry. Thank you.
Honourable Senallang, please proceed. Supplementary question
Thank you, Datuk Speaker, and thank you for the early answer mentioning question 31. I wish my old friend good health. It is with a heavy heart that I ask, because he is unwell, just out of hospital, nevertheless I think, just a, if I may, I would like an explanation as the Honourable Member stated, the State Government's plans regarding the situation that has occurred, listed company FELDA, listed companies in the State of Sabah, FELDA, hundreds of thousands of acres of State Government land.
Listed stock exchange companies that are registered, profits, if we see, we hear hundreds of millions of ringgit, yes. What steps are the government taking to ensure, return it back like CSR, yes. We say, does the State Government take steps to ensure that, apart from tax, tax is important as well. But CSR, for example, it is not in Sandakan, it's a dead town, used to be a booming area like Hong Kong, but the situation is not, I agree with the Honourable Minister, it's not just employment, between there's no split over listed
company Sandakan, by hundreds of them. What is the return to the Sandakan people? Roads, CSR, children's scholarships, at FELDA Umas-Umas in Tawau, FELDA profits are reported at hundreds of millions, but we don't hear about it. If you go to Pekan Tungku it's dark, if you go to Pekan Tungku the roads are full of holes, but if you go to FELDA it's bright, the lights are good, the roads are good. What is the CSR? I think we must press if there are plans, I suggest negotiating as well as possible. We cannot shut down these companies, but negotiate well, what other CSR they can contribute, how much they can contribute, what is all the CSR: education, health, development, environment of the district. Thank you very much, Honourable Minister.
Thank you, Honourable Senallang.
Firstly, our action is to improve our own house, the tax collection system. I found that, and it is rather surprising to me, that the number of staff assigned to collect billions of ringgit is not large. So, our first step is to expand the number of staff in the section that manages collections.
Secondly, improve our system so that our collection is more effective. We are working together with, ah, MPOB and also SPRM. In fact, I can state here, ah, Honourable Member, this, I have not answered the first one yet. We found that we have issued five assessment notices involving RM53.36 million to those who under-declared, under-declared palm oil tax that should have been paid to the government, of which the amount paid so far is four million, but we have an instalment scheme for those who unintentionally "perhaps submitted accounts lower than what should have been paid to the government"
but believe me, the Ministry of Finance, with the cooperation of certain agencies, will ensure we can recover all that should have been collected, and, if I may state here, the amount is really, really high that should have been paid. Sometimes there are companies...
There are 2.
Statistics given to other Honourable Members' inputs. That is correct, but the statistics submitted to the Ministry of Finance are a little. So the tax is based on the statistics submitted to the Ministry of Finance. That's the reason why, there have been cases where staff were arrested and, as I recall, were also brought to court for allegedly being accomplices. So we are trying to breach this little problem with MPOB. So every time we receive, ah, accounts to submit how much they have to pay, we will check with MPOB to ensure that it is the same or the amount is the same.
Secondly, if we still have doubts, we ask SPRM to come in and investigate separately. This is the first step, so we put our house in order first. Another second level, the second level is to add staff. For the information of this august House, Datuk Speaker and everyone in this House, we are waiting to upgrade this section into a separate department within the Ministry of Finance. So they have more staff to work, because they are collecting billions but the staff are not enough. And insya-Allah, with improvements to our administrative management system, I think we can carry out our responsibilities better, and ultimately what the Honourable Senallang said, I myself agree. I think they should do more. They should do more and this is our problem, not only in Sabah but in other places too.
They want profit, but what is returned to the community is too little. I think this is a systemic problem in our employment system. People want to make profit all the time but return only a minimum to the community they have served or are serving. So I hope this is a topic that we hope we can all think about. We are ready to receive proposals from people that can improve. Improve the role or function that can be played by these big companies so that their presence in the village or wherever, at least becomes a blessing to those who live there. Thank you.
Thank you. Now I give the floor to Moyog. Supplementary question
Terima kasih Datuk Speaker. YB Menteri, good answer and I give it to you. Ini juga kita juga patut mengesahkan ataupun membuat audit dengan timber all those stamping that now very suspicious. Bagaimana mereka telah membayar balik royalti kepada kita termasuk juga apa yang telah dibangkit oleh beberapa YB di sini awal kelmarin berkaitan dengan emas. I suspect they have I mean just as to quote Datuk Speaker, I have charge someone. So they have remanded someone, they are cheating the government birds nest. I think this is also another asset revenue...
Honourable Member, Honourable Member Moyog, please keep to original question. Unless the Minister agrees to answer, ya.
Ya this overall, because banyak kehilangan revenues Sabah atas apa ini manipulation of extraction dan juga production and I think we should not limit only to Palm Oil tetapi all the minerals have been extracted dari Sabah. Terima kasih.
Datuk Dr.
Datuk Speaker, may I…
Let the Minister answer first. Honourable Sulabayan.
(overlapping voices between the Deputy Speaker, YB Sulabayan and YB Karanaan)
Terima kasih kepada Yang Berhormat daripada Moyog. Memang tugas kita ialah seperti mana saya nyatakan secara jokingly ya, we should act like an Ah Long sekali-sekala untuk pastikan semua hutang yang di apa tu berhutang kerajaan dapat dikutip semula. Bukanlah gaya Ah Long tapi erti dia betul-betul kerja keras untuk pastikan what is
due to the government is pay to the government and we take it up bagi kita anything the revenue that belong to the state, we have to collect it. Terima kasih.
Honourable Members, the question-and-answer session has ended.
Resumption of debate on the motion to express gratitude to His Excellency the Yang di-Pertua Negeri for the government policy speech that has ...Motion
Resuming the debate on the motion to express gratitude to Tuan Yang Terutama Yang di-Pertua Negeri for the government policy speech delivered by Tuan Yang Terutama.
Honourable Members, the question before the House is that we, Members of the Sabah State Legislative Assembly, express our gratitude to Tuan Yang Terutama Yang di-Pertua Negeri for the government policy speech delivered by Tuan Yang Terutama on Monday, 22 May 2023.
Meanwhile, the debate is commenced. Accordingly, I respectfully invite the Honourable Sulabayan. 15 minutes. Datuk Dr.
Thank you, State Assembly (DUN). It should be 20 minutes. Assalamualaikum wbk. Thank you, Mr Speaker. By the grace of Allah SWT, I am able to be present together with everyone in this honourable House, to express my highest gratitude to Allah SWT for being able to take part in this sitting and for being given the opportunity to debate the Policy Speech delivered by His Excellency the Yang di-Pertua Negeri of Sabah.
Mr Speaker, there is a lot of content in the Policy Speech, but I will focus more on tourism. As we all know, the tourism industry of the Ministry of Tourism was among the first things mentioned in the policy speech delivered by His Excellency Tun, and if we look at several figures, it is said that the tourism industry is a major source of income for the State of Sabah. When we look at the data given, in 2022, tourist arrivals reached 1.73 million after the country's entry points were reopened, and the ministry concerned also focused on tourist arrivals of 2.2 million, which is estimated to bring us earnings or income of RM4 billion.
This sounds nice to hear. It sounds nice, the figures. Even before the tourists have arrived, we are already focused on 4 persegi.
My question here today is about the tourism industry in Sabah becoming an attraction in terms of bio, what is it, its ecosystem and also biodiversity. We encourage tourists to come here, but there are many problems I see that do not meet tourists' needs, especially since the attractions available today are based only on natural beauty. Yet in Sabah, as we all know, there are many attractive places. In Ranau, in Kundasang, in Semporna, in Tambunan, in Kudat. But I see that when I receive feedback from tourists, they say it is a pity that Sabah has, as people say, such beautiful natural landscapes. So that is why I see that we are only focused on tourist arrivals and the income we will earn, but our preparations, that is what is in my question to the Ministry of Tourism: what are the Ministry of Tourism's preparations and plans to offer or to cope with tourist arrivals? Take the entry points in particular. Airports, air travel. Because we do not yet have ferries except on the Tawau side. The Kota Kinabalu airport, as we see, although the airport looks physically good, the facilities, I see the lights, especially in Tawau. In Tawau, if the last flight is at 7 o'clock, it is dark.
May I interject briefly, Datuk Speaker?
Can I give way to the Honourable Sulabayan? I want to interject. Please, Moyog.
Just briefly. Do you agree…
...Honourable Sulabayan, that the airport in Kota Kinabalu, I do not know about Tawau and Sandakan. But in Kota Kinabalu, do not talk about the physical building and its problems. Parking. If you go and park, if you use public parking, only one, what is this. The meter that can issue tickets, and sometimes out of three payment machines, if one is broken, okay. Two broken, then it is difficult. Three broken, a problem. Its standard is non-existent. An International Airport, Honourable Sulabayan. International Airport. We talk about wanting a Sabah Airline and so on, yet we cannot even resolve this. Thank you.
Continue, Honourable Sulabayan. Datuk Dr.
I will include it in, what, my speech. Speaking of the beauty of the airport just now, yes, when we invite and hope for many tourists to come, but what are our preparations? Let me give an example.
As I mentioned about Kundasang, I am really disappointed with the development in Kundasang. When I compare Kundasang, it is better than Cameron Highlands in, in Pahang. If we compare Cameron Highlands, it is not as beautiful as Mount Kinabalu, yes. In terms of weather, Kundasang is even better than Cameron Highlands.
However, Cameron Highlands today is categorised among world-class tourist destinations.
So, looking at the roads, it is the same going to Kundasang. The infrastructure there, from what I see in terms of housing planning, coincidentally, the Deputy Chief Minister is from Kundasang, Datuk, what is it, Joachim. I see that it is very disappointing for us. The planning there, this place is very beautiful, in Kundasang. But besides that, I also see that the development is disorderly, the markets, even though Kundasang is famous for its vegetables.
If we look at Cameron Highlands, which I mentioned earlier. Besides good accommodation and good roads reaching there, they also serve food and drinks made from local produce.
For example, strawberries, vegetables, not serving prawns or fish, based on agricultural resources. So, it must be related to the natural resources available there, and likewise in Semporna. Nobody says its shortcomings are very many. That place is among those already famous in, in the world today, in terms of scuba diving and the beauty of its islands. If we compare it with Bali, I have also visited Bali. The islands and beaches of Sabah are even better than those in Indonesia. But they have become world tourist attractions, why? Facilities, its amenities.
Hotels, roads, as well as food, and also the handicraft goods they sell. This is what needs to be improved. Today in Semporna, in Ranau too, in Kota Kinabalu too, there are many complaints from tourists about hotel accommodation prices. Hotels in our place are too expensive, that is what I want the Ministry of Tourism to pay attention to, including the Local Government. Hotels, just kiosk-type hotels, up to RM200.00 a night. If we compare with Vietnam and Cambodia, because I have also visited there. A hotel like the Hyatt in Kota Kinabalu, standard room, its facilities are very good, the price is only RM280.00 a night. In our place, hotels that should only be RM60.00 to RM200.00, especially with this large influx of tourists, our operators in the tourism industry seem to take advantage.
This is an unfavourable action, because in our efforts to develop tourism in the State of Sabah in particular, we must think of the long term, not just with tourists coming, we also, we take the opportunity to raise prices, this too must be taken into account. In addition to the existing infrastructure and facilities. The same goes for restaurants, accommodation, and transport, when many tourists come, they take the opportunity to raise prices. This must be controlled.
Besides that, there are also complaints about. What is it. In Pulau Sipadan, the place where people go scuba diving. The prices are not standard, some say one person is charged RM120.00 for diving, some also say RM130.00, and some, if international, set the price at RM200.00. This too must be given attention. It is very worrying when these matters are not arranged and not standardised, it may become an issue, and it will erode the confidence of tourists, especially scuba divers, who may not come to Semporna or to the other islands. And likewise, one of the tourist attractions in Semporna is climbing Mount Bohey Dulang, yes. This is very popular now, climbing Mount Bohey Dulang, Bukit Bohey Dulang, to reach the summit, to see the rainbow lagoon panorama on that island. Currently RM60.00 is charged per climber. Is it true or not, this too must be given attention because it has become a complaint from tourists who come. Before, they said it was free, but we really do not encourage free. But at least, a price of RM60.00 per person is quite too expensive, because we must think of the long term too. Yes, if it is only seasonal or limited to certain places, I think people will not be able to see the beauty of this land of the State of Sabah. So, Datuk Speaker, Mr Speaker, the Ministry of Tourism must pay attention to this matter in our efforts. Tourism is an opportunity in the sector of increasing the income of this State capital of Sabah.
Besides the tourism sector, I also emphasise agriculture. Among the second matters touched upon in this Policy Speech. Because when I look, everyone knows Sabah has vast land, very fertile for its agricultural sector. Whatever is planted, everything grows. But I see that it is still emphasised, among the priorities, planting what, Musang King durian, and not yet Black Thorn. We hope Musang King, it will produce in three or four years, if it is well looked after. If it is not well looked after, the capital is so big.
Whereas, in China now, on Hainan Island. On Hainan Island, they have now planted, what is it, this durian, 3,000 hectares. Why is what is being publicised not only in Sabah, in the peninsula too, its potential, they say Musang King and Black Thorn in China. Now China has done it on Hainan Island, 3,000 hectares. So if we encourage planting durian, it is not bad, but it should not become the main focus.
I see that when I visit markets, supermarkets, among the issues now, the price of chilli is very expensive now. Most people eat a lot of chilli, this bird's eye chilli, I see one kilo at RM35.00, this chilli RM35.00. In Kuala Lumpur, and in Sabah too, sometimes there is no supply, whereas chilli has good potential for us to develop downstream. Not only do we eat chilli when eating with dishes, usually we need pepper too, but downstream there is none. Besides chilli that we eat directly, we can make chilli sauce, we can make dried chilli powder. Dried chilli powder too sometimes has no supply, whereas this has potential from us making an industry, what they call high-tech or whatever, in the end, perhaps big traders will enjoy it. But small traders and ordinary people cannot enjoy it. This is one of the concepts, we encourage small industries, that is, in terms of this downstream, so that it benefits the people and also individuals or farmers in rural areas.
I also prefer, among the things that caught my attention, the need for a rice granary, rice cultivation. This also has very great potential, because a rice granary is not only where we take rice to eat, there are many downstream activities we can do. I have seen several times at, what is it, exhibitions in Thailand. From this rice alone, there are many downstream products they can make, not only do we eat rice, but the downstream is very extensive. For example, we can make, what is it, cooking oil from this rice, and also other equipment, other facilities for health. This too is among the potential of, what is it, this durian and others.
And likewise, among the resources that are abundant on the face of the State of Sabah is Agarwood. This also has potential, this Agarwood. It grows naturally in the State of Sabah. This too must be given attention. This Agarwood…
Datuk Dr.
It produces oil that can be used. Perfume and also facilities for body care are important. This too we must also pay attention to, because this can be developed by local communities or small smallholders who have land. We need to mobilise them, but there must be a department or agency or mentor to guide them and provide guidance to them.
That is what I emphasised when we talk about the food industry, livestock, agriculture, fisheries, we need an agency, R&D to conduct research. If we just tell village folk, tell them to plant agarwood or tell them to plant, what is it, rice or whatever, but without R&D we cannot do it. People say that the downstream given has potential, we can do it.
So, Mr Speaker, these are two of the matters I need to pay attention to in the State Government's Policy Speech this year. Besides that, I am also interested in the TVET Education Policy. This is also very important because TVET, two countries have succeeded when emphasising TVET education, technology and innovation. Yes, technology and innovation. Among them are Korea and Japan. They succeeded in developing their industries as a result of this TVET, that is, what is it? Encouraging the public to have skills, so that when we master TVET, we not only provide employment opportunities or create skilled workers. Moreover, they also encourage them to do business through the skills that they have.
So, TVET must be enhanced, especially in the State of Sabah. We have schools that are not under the Federal Government. Yes. I give an example, like what school is it? Agriculture, Timbang Menggaris, because the agricultural sector is also very important. We need to master, in terms of our ability to explore any downstream in agricultural fields that we can generate, providing income and employment opportunities for the people of the State of Sabah. Therefore, we must make use of it, that during the time of the Warisan Party Government, we established the Ministry of Education and Innovation.
We do not want to interfere with the Ministry of Education Malaysia. We do not interfere with the National Education Policy, but what is important is that we want to produce, especially our young people, so that they have skills, and these skills are very important. Moreover, Sabah will move towards becoming an industrial state. When investors come, whatever type of investment they make, among which investors emphasise, besides large land and sufficient infrastructure such as electricity, what is it, roads, water. They ask, is there a need for skilled manpower in the State of Sabah? And that is why it is important for us that TVET must be enhanced.
Honourable Sulabayan, please wind up. Please wind up. Datuk Dr.
There is still a lot (unclear). A lot more (unclear). It's fine, just three more. It's fine, that is what I emphasised regarding this Policy Speech. In fact, Datuk Speaker, what is important is that even though we are in the opposition, we have a responsibility to ensure that the State of Sabah becomes a prosperous state.
Regarding what the Honourable Member raised about infrastructure, water, and electricity, all of these are important to us.
I cannot place this solely on the government. We as the opposition should also share it. That is why we question these matters, they must be heard, they must be seen. If we are asked to be given a role together, God willing, we will cooperate. As for water, I will give an example, much emphasis is placed only on the Water Department. On water matters. When the problem arises now, there is no water, and the Water Department becomes an obstacle. Whereas I know we have several concessions of the Water Department. We ask the government, what is the role of the concessions? Three concessions have been appointed by the State Government. What is the role of these concessions, and likewise regarding roads that are uncomfortable now, which have become the talk of the people every day. We have concessions for maintenance. There are three concessionaires. This is what must be emphasised, because they have been assigned the task of carrying out repairs and maintenance of roads that have become obstacles, and also the government.
Public Works Department.
What is the point of us appointing them as concessionaires if they do not implement it according to what has been set by the government or the people? So this is necessary. All these concessions must be taken into account, and if they cannot fulfil what has been mandated, we must terminate them or review their roles. So Mr Speaker, there is a lot more, but due to time constraints I must abide by the time allocated to me. To make…
1 minute. 1 more minute. Datuk Dr.
1 minute more. Okay. Finally, Datuk Speaker, whether a government or a country succeeds in developing our nation does not depend on how much revenue we collect. What is important to us is how we deal with the problems faced by the people today. This is what matters. Much revenue is obtained, yet the people are still facing many problems in terms of the economy and income. This is also important to us. So, before I conclude, I also ask that it be entered into the Hansard. I have repeatedly raised in the State Legislative Assembly the clinic at Pulau Bum Bum. Yes?
Although there is no Ministry of Health, I think the Health Department is here. I have twice brought the Minister of Health from Kuala Lumpur to the Pulau Bum Bum clinic. Its facilities still have not been upgraded, and likewise the police station at Pulau Bum Bum. I pity the police station there. It is still in containers. Not only the office but even their living quarters.
The previous government, not the current government, not the Warisan Government, had promised that there would be a permanent building for the Pulau Bum Bum police station. So, I must also stress this so that the parties concerned pay attention. So Datuk Speaker, finally, thank you for the opportunity given to me. I hope the government today and in the future can manage the people's problems well.
That concludes my speech, wabillahitaufiqwalhidayah, wassalamu'alaikum warahmatullahi wabarakatuh. I beg to second the motion.
Thank you, Honourable Sulabayan. Now I invite the Honourable Member for Telupid. Please proceed, Honourable Member.
Thank you, Mr Speaker. Mr Speaker, the government's policy speech delivered by the Yang Terutama on 22 May 2023 has indeed covered all aspects for the state of Sabah, which include the economy, administration, health, education, youth needs, and also the development of infrastructure and utilities across the whole state of Sabah. However, Datuk Speaker, there are several aspects that need serious and immediate attention from the government so that they can be resolved thoroughly.
If we consider the problems that have gone viral as a human being, we can regard them as a chain disease or a series of diseases. That is, in a human, heart disease, high blood pressure, or diabetes. If this series cannot be cured, the person will become paralysed or die. So, this can be compared to the main problems in this state of Sabah, namely the water problem, the electricity problem, and the road problem, and these are the interlinked or serial problems for the state of Sabah.
Therefore, Datuk Speaker, we cannot take these problems lightly because they will certainly paralyse our state and our administration. These problems can cause pressure, stress, and also panic among our society. Let us take just one example. Someone dies, there is no electricity. Then, waiting for family to return from Kuala Lumpur or from a remote district, they need a refrigerator. No electricity. Imagine. During Hari Raya, people want to prepare food and there is no water, no electricity..
Public places such as airports and hospitals have no water and no electricity. Industrial areas and business premises have no water and no electricity. This will paralyse the government and our state. So, this is why we ask the government to resolve this basic problem, namely this chain disease, before it becomes chronic. Do not let our people become angry and distressed. They will hold demonstrations. Sri Lanka is an example, Pakistan, India. Then also developed countries such as Britain have had strikes. Transport was paralysed, and they suffered losses of billions. I ask the government to take firm action. Action that truly resolves this problem. Let us not keep returning to the State Legislative Assembly to talk about the same matters for decades.
So Datuk Speaker, several proposals for this water problem are being considered by the ministry, namely: Establishing the Sabah State Water Services Commission, or SPANS, which will be responsible for planning and making projections of water usage.
Coordinating and ensuring clean water supply throughout Sabah is protected and reaches 100% installation in every district. This commission will also strengthen regulatory power, set water supply rates, and monitor maintenance and improvement works relating to the Water Department.
Establishing a government-linked company, namely a GLC or a water constituent in Sabah, that will compete with other companies for pipe installation works, pipe maintenance, and the provision of clean water supply throughout Sabah at appropriate prices that do not burden the people.
Restructuring the functions of the Sabah State Water Department so that it can focus on maintaining water treatment plants and dams, to ensure clean and consistent water supply. We will reduce the water monopoly in Sabah but create healthy competition that benefits the people of Sabah and the Sabah State Government.
So this is what we can propose to the ministry to take action to reduce or resolve the water problem in this state of Sabah. We also want more detailed and more efficient planning for water supply projects in rural areas, especially, for example, in the district of Telupid, where several projects cannot be used since before I became the YB. The Mukim Developer once raised this matter. Why can these projects not be used, such as the tank at Batu 6 Kampung Wonod, and Batu 7 Kampung Wonod, which until now have become bat roosts. They cannot be used, they have no function. There are several more tanks at Simpang Lumou, there is no booster pump. There are pipes, but no water. So when the government makes plans, it should, I ask the directors and engineers to sit with the people's representatives so that we can together identify and plan priority projects in every district. Sometimes, I apologise Speaker, sometimes the problem is that some of our heads of department do not like to attend the District Action Meeting. Therefore, Datuk Speaker, I request the Directors, the Permanent Secretary of the State Government, and the Ministers to always go to the ground to monitor the problems that occur themselves, while also checking on the officers and staff of the departments under the relevant ministries.
I mentioned earlier that some heads of department do not attend and often send representatives to the District Action Meeting. I ask the directors to take the initiative to pass this matter on to the officers under them so that they take up their role. So that when we hold discussions at the District Action Meeting, we can assist them, so that we are involved together and can jointly clarify the real situation of the problems faced. If only the people's representatives are bombarded and scolded, while we are invited to Hari Raya and receive messages saying Sabah Maju Jaya, yet everyone is dying. How? So Datuk Speaker, we must take action on this matter. We also ask the directors, before approving any planning in the district, to please give notice to the people's representatives as well. Sometimes, I apologise Datuk Speaker, with permission, sometimes the contractor is more important than the people's representative. It is the contractors who prepare the work. I do not know whether this is correct or not, but based on what is commonly said among friends, the people's representatives are not involved.
So Datuk Speaker, regarding the electricity problem also. We face the electricity problem together. Therefore, I would like to propose that the government has a responsibility to explore new energy sources, and I agree with the ministry regarding, ah, solar projects and so on. However, new sources such as coal and also hydroelectricity need to be considered, given that our electricity situation is becoming increasingly critical. Besides that, regarding roads. The roads are extremely critical, especially the Telupid - Sandakan road, Ranau to Telupid, Sandakan checkpoint to Lahad Datu, which are extremely bad. Perhaps we can propose to the government that these federal roads be taken back, because we pay road taxes to the federal government for nothing. But if it concerns channelling assistance to build our roads or maintain our roads, we have to humbly approach the federal government. So, I propose to the ministry through this honourable House, perhaps we can also consider installing tolls on federal roads, and these federal roads be taken over by us, and we have to install tolls, because that may be the solution for maintaining the roads in future. When the Pan Borneo or these main routes are completed. Like in Kuala Lumpur, they installed tolls on their roads, and they are good.
Honourable Telupid, I will take this opportunity. Please sit for a moment. Just now, Honourable Telupid mentioned that the government, what, Sabah Maju Jaya, but what word did you say just now?
Ah, a curse word that I feel I need not say here, Datuk Speaker.
Thank you. Now, please sit. I am amazed that every time, ah, when I sit here, I hear Honourable Members, not all, saying that Sabah Maju Jaya but not doing what they were ordered to do by the people. Okay. So, the phrase Sabah Maju Jaya should not be used as a, ah, slander and an insult to the government that is in place. I, as Speaker…
… Uphold the Constitution of the State of Sabah, and so do all of you. If any Honourable Member has time one day, take the Sabah State Constitution book and look at the page where it states that the Constitution shows that the flag is also in the Constitution, and when and also the logo, that too is in the Constitution, in that clause, one.
When Honourable Members take the oath, yes, I apologise, let me tell you just a little: 'I, having been elected or appointed or nominated as a Member of the State Legislative Assembly, do solemnly swear that I will bear true faith and allegiance to the State of Sabah and also the Federation of Malaysia, and that I will preserve, protect and defend the Constitution of the State of Sabah and also the Constitution of the Federation'.
So when you threaten 'Sabah Maju Jaya' and link it to the existing government, that is wrong. That is not, if you are in the state, if the Honourable Member uses this word, if you were in those Pakistani states where you would already have been shot, taken away, because here there is no law, okay. So I ask Honourable Members to avoid using, desecrating our Constitution, yes.
Thank you Datuk Speaker.
Yes, I ask. The Honourable Member who is here.
Thank you Datuk Speaker.
… Avoid it. Do not use it again. If I sit here, I hear, I immediately, what is this, this is a fatwa
that I bring, please. Thank you very much. Please, I will give you more time to finish.
Thank you Datuk Speaker. Actually Datuk Speaker, those words did not come out of my mouth, and it was not my intention to, to curse or to show disrespect as my promise as a people's representative.
That is our emblem. Look above. Back in the British times there was the Pergo Art, Perego, yes.
Ya.
Now we have this.
Not, not made by this new government. This was made by the previous government, Tun Mustapha and others, yes. Thank you. Continue.
Okay. Thank you Datuk Speaker.
Regarding the roads I mentioned earlier, some examples or proposals I put forward earlier, I ask the Ministry to consider them as I said earlier, rather than us constantly begging, humbly approaching the Federal Government for allocations to maintain roads and build new roads, but there is no end in sight. So I propose that these federal roads be taken over by the State Government, on condition that perhaps by then we will collect through tolls, because of the success in Peninsular Malaysia where we see that their roads have concessions or companies that maintain them, and we are forced to … (unclear), if that is the solution, we propose to the government regarding the solution to the road problem in which we are very disadvantaged throughout the State of Sabah. Datuk Speaker, I would also like to touch on poverty eradication in the Policy Speech by the Yang Terutama.
Poverty eradication is something we need to work on, given that the State of Sabah is also the poorest state in Malaysia. Therefore, I call on the government to step up efforts to attract investors not only in urban areas but also to rural areas, and we thank the government for providing efforts in providing affordable housing 'SMJ' valued at 70 thousand per unit to the B40, which we very much welcome, and we want to request that such projects be spread widely to every corner of the State of Sabah so that the whole of our society can enjoy this affordable housing.
In addition, Datuk Speaker, I touched on the matter of attracting investors just now to be developed in rural areas, such as wood-oriented industries. In Telupid, it is surrounded by a Forest Management Unit, which is a unit in the permanent forest reserve granted to logging concessions for 100 years, namely felling and harvesting, as well as planting, planting timber trees such as rubber and so on.
So we see there is a resource. We ask the government to attract more investors because, ah, this timber may be processed into furniture. So when there are factories and industries in rural areas, for example in Telupid which is surrounded by the 'FMU' companies, we can invite investors to set up furniture factories and so on, sawn timber, plywood and so on. And this will certainly provide employment opportunities for our youth. So we ask the government to also look at investment opportunities in rural areas, not only in Telupid but in other rural districts that have their own resources.
In addition, investment based on agriculture such as meat, milk and so on. In Telupid there is a large area belonging to the Veterinary Department, so I often raise in this House what the functions of the Veterinary Department are. Is it only for rearing and research? But we are not milk producers, we are not meat producers. So what is the use of this large area if it is not developed? If there is no capacity, then attract investors. If there are investors, there are employment opportunities, and then we can eradicate poverty through providing employment opportunities to our youth. Our young people are pitiful, many go to Peninsular Malaysia. They have qualifications but no job opportunities. So we ask the ministry and also the government to take more serious, efficient, and more
creative steps to provide employment opportunities through initiatives and efforts to attract more investors to come to our state.
In addition, in poverty eradication, I have always emphasised the issuance of land titles, because land titles are also one of the things that can lift these villagers out of the poverty trap, because when they have land titles, they can apply for assistance from the government, such as from the Agriculture Department, Datuk Speaker. Plant Musang King. You can plant that 'MPOB' (Malaysian Palm Oil Brand), palm oil, if you have a title, and all of these must require a title from the 'LIGS' (Sabah Rubber Industry Board). They need titles.
So, I ask the ministry and the Lands Department to issue land titles to village folk who have not been issued titles for a long time. During the session, I do not remember, I was answered by this honourable House, that 400 land titles would be handed over in Telupid District, but when the Most Honourable, with permission, came to Telupid in April, I am not sure whether it was 2021? Only 100 land titles were given. He said the 400 was a mistake of ours because it was mixed up with the land titles in Tongod. So please, when we have spoken in this State Legislative Assembly, I immediately convey it to my people. 400 pieces, and those that will be handed over later, there are still hundreds more. So even those 400 did not arrive, let alone the hundreds after that.
So I ask the Lands Department, let us seriously issue land titles to village folk because this also helps them out of the poverty line. Shameful, we are poor but there is a role. These departments help us out of the poverty line. Do not let only political people bear this. Please let us be serious in helping with land problems in every, I think not only in Telupid, the whole district. Yesterday there was a demonstration in front of PPNS (Sabah State Administrative Centre) and I was informed …
Tuan Jonnybone J Kurum [Telupid]: …I was informed that there were also people from Telupid, Sugud, Kuamut, Tongod, I do not know from what other districts.
Honourable Member, may I pass?
Silakan.
I also saw that there are demonstrations on Facebook. I have looked into it, and these demonstrations were fabricated by outsiders from Sabah, so from the Peninsula. So, there is a political motive. As for the others, the demonstrations are mostly not accurate and have no facts. Thank you.
Thank you, Kemabong. However, optics cannot cover up the facts. When people have already seen it, perhaps we can explain it to ourselves, but others have already spread it widely, and they will say the land problem still exists. So, Mr Speaker, this is what we as the government must resolve, to speed up these problems so that our people out there can be helped in the best way.
Mr Speaker, regarding the problem of water theft, which involves a very large amount of loss to us, caused by water theft that, according to investigations and enforcement monitoring, mostly involves squatter areas, and of course if these squatters are involving undocumented migrants. So, for that reason, we ask in this House too, I raise the matter of solving the problem of undocumented migrants in this state of Sabah, which I think has been touched on only faintly. Because our water problem is already a problem, and it is being stolen again. Not only water, electricity is being stolen too. So, village folk sometimes, if they are desperate, would not go so far as to hang onto these electricity cables to connect the power, but I think this is being done by people who are desperate, and perhaps this is also done by undocumented migrants. So, for that reason, this is all related
in terms of solving the problem. We ask the government to be serious in solving the problem of undocumented migrants, undocumented migrants.
Yang, Honourable Member, is this merely an assumption from PTI, or has the Honourable Member conducted some research regarding electricity theft a…
Yes, we have...
There are also some among our own people, our own people too.
Ya.
So, don't make a sweeping statement. Please, ya.
Yes, that's right, Datuk. Our own people, when they see that expertise on the other side, the experts too might be wrong, getting free water and free electricity, so they just follow along, Mr Speaker. They might be wrong, but I think it is not our people who started this.
So, Mr Speaker, all of this is connected, and for that reason I would like to propose in this honourable House that there be a drastic and truly effective action regarding the problem of undocumented migrants, as we have raised for so long, namely to propose that a Bipartisan Committee be established by the State Legislative Assembly to solve this problem. We are sure all parties are involved, we ensure all parties are involved, including the opposition, so that they can together propose solutions and subsequently agree to all decisions made at the committee level, and I am confident that with the establishment of this Bipartisan Committee, we can take steps towards a more prosperous, peaceful and harmonious Sabah.
Mr Speaker, once again I would like to touch on cooperation between the implementers and the policymakers, namely politicians and government officers, so that they continue to cooperate with us. Let the criticisms from the Honourable Members of this State Legislative Assembly towards officers not become a gap that creates hostility in administering the State Government. Let there not be even a slight thought in the minds of civil servants to sabotage the government's agendas because we are vocal in criticising civil servants. That is not really our intention, but we have an effort to seek better collaboration and cooperation. Therefore, we focus on this cooperation because the people out there are our race, our family, our children, our community. So, let there not be even a slight thought in civil servants, as implementers of policy, to quarrel or fall out with politicians, because we want the state of Sabah, we want to build it together. Let us remember that the positions we hold are not a privilege but a trust and a responsibility. Our present position is not the result of our own strength but an opportunity and a gift from God that God has given us. Let us devote our service with full dedication and full trust for the sake of our beloved state of Sabah.
Mr Speaker, on this occasion I would like to extend Kaamatan greetings to all the people of the state of Sabah, and I, Telupid, also support the policy address delivered by the Yang Terutama. Thank you.
Thank you, Honourable Member for Telupid. Now I invite the Honourable Member for Tanjong Papat, if he is in the House. Sorry, Tanjong Kapor. The writing looked like Tanjong Papat, so I invite, with all due respect, the Honourable Member for Tanjong Papat. Please. Sorry, Tanjong Kapur.
Thank you, Mr Speaker, for providing me with the space and opportunity to debate the government's policy address delivered by the Yang Terutama Yang di-Pertua Negeri
on last Monday. I would like to bring to the attention of this House several problems that are plaguing my people in Kudat and almost all the people of Sabah, namely disruptions to electricity and water supply, street lights, and potholed roads, especially in the villages, which are increasingly worrying.
For your information, recently, these basic needs problems have reached a critical stage to the point that they have begun to affect every level of society, including schoolchildren and small traders who depend on electricity supply for daily life and for carrying on their business. Sometimes electricity and water supply are cut off during the public examination season, which will certainly affect students' preparations for important examinations such as SPM or STPM, and sometimes small traders who have prepared their raw materials have to throw away those raw materials because they cannot continue preparing food due to no electricity and water and electricity supply.
…because this is a short-term solution, and it will certainly become potholed again when the rainy season comes, the patches will break and then be patched again, and moreover the patching is not done according to any proper standard. How long will this futile work be continued when their maintenance contracts are so large and lucrative? In conclusion, Mr Speaker, I would like to take this opportunity to extend "Kotobian Tadau Tagazo Do Kamaatan" to all my people in the N.4 Tanjong Kapor area in particular and all the people of Sabah in general. Tanjong Kapor humbly supports. Thank you.
…because this is a short-term solution, and it will definitely develop potholes again whenever the rainy season comes. The patch will break, and then they patch it again, and what is more, the patching is not even done according to proper standards. Until when will this futile work be continued, when their maintenance contract is so large and lucrative?
In conclusion, Datuk Speaker, I would like to take this opportunity to say "Kotobian Tadau Tagazo Do Kamaatan" to all my people in the N.4 Tanjong Kapor constituency in particular and to all the people of Sabah in general. Tanjong Kapor humbly requests your support. Thank you.
Thank you, Honourable Member for Tanjong Kapor. Now I invite the Honourable Member for Banggi, 15 minutes, ya.
Peace be upon you, and may the mercy of God and His blessings be upon you…
Walaikumussalam.
Thank you, Mr Speaker, thank you for the space and opportunity given to me to debate and state my stance, hopes and support for the policy address of the government that was delivered by the Yang Terutama Yang di-Pertua Negeri Sabah on last Monday, as a Representative of the People and Member of this Honourable House. I convey my congratulations and felicitations on the success of the government, led by the Yang Terutama Tun….
Just a moment, Honourable Member. Just a moment, just a moment. After Banggi, Kunak, Limbahau, and after Limbahau, Kuamut, ya. So please be ready, ok, please continue, Honourable Member for Banggi.
The Honourable Chief Minister leads this. I hope that all the plans contained in the Government's Policy Speech can truly be translated into action and felt by every level of society, especially those in rural areas and the interior, because progress achieved has no meaning if these groups continue to be marginalised and kept far from any economic development and people's welfare programmes.
Mr Speaker, to translate all the plans in the Government Policy requires the excellent roles and responsibilities of everyone in this Honourable House, including the State Cabinet, all Members of Parliament and the Top State and Federal Civil Service. How do we ensure the plans in "Sabah Maju Jaya" spread to all areas throughout Sabah, and that every Ministry needs to go down to the interior areas to examine every need of the people, besides listening to and carrying out the requests raised or conveyed by every Member of Parliament?
Datuk Speaker, my debate this time will touch on the whole matter of Pulau Banggi, which we may not see its advantages, but so many outside parties have studied, researched and examined every potential of this island. Pulau Banggi is a cluster of islands located to the north-east of Kudat, close to Teluk Merudu, consisting of Pulau Balambangan, Pulau Banggi itself, Pulau Munawali and several small islands within the Tun Mustapha Park (TMP). Located at the furthest northern tip of Sabah State and positioned in the middle of the South China Sea and the Celebes Sea, and surrounded by neighbouring countries such as the Philippines, Thailand, Cambodia, Vietnam, Singapore, China and also Indonesia, within the same location Pulau Banggi is also in the active circle of BIMP-EAGA trade, which has a population of 57.5 million people, besides being on the strategic route at the gateway for entry and exit to the Far East trade area. The position of Pulau Banggi is a very strategic location and is very suitable to be made a focal area and attraction for investors as well as for economic growth in the Asia Pacific and International region, making Pulau Banggi a catalyst and at the same time a hub and trading centre to support and boost trading activities in the Asian region, which are mostly still underdeveloped and still searching for a clear identity to chart their own way forward. Therefore, the opportunity that… therefore the opportunity to make Pulau Banggi a smart digital tax-free island or something similar must be given due attention by the government. However, we admit Pulau Banggi is still far behind in the mainstream of development. Pulau Banggi is like the fairy tale 'The Sleeping Beauty' that is still asleep and has not yet been awakened to be developed. Hence, it is hoped that the Sabah Unity Government will be able to play the lead role as the prince who comes to touch and kiss 'The Sleeping Beauty' so that she wakes from her sleep and rises, and becomes a great, beautiful and developing island.
Mr Speaker, regarding the Government Policy Speech, there are several sectors contained in that policy speech that are very synonymous with Pulau Banggi, among others, the tourism sector, the agriculture and trade sector, plantations, and the land-sea livestock and aquaculture sector, which I think must become the core of development in Pulau Banggi if we want to see this island and its people protected and developing successfully. So,…
Tanjung Aru, don't play with your phone…
Therefore, in terms of tourism sector development opportunities, besides efforts that need to be tightened up and intensified to encourage tourists to come to the destinations that already exist. I also suggest that the State Government and also the Ministry of Tourism explore new areas or destinations with potential, especially in rural areas, not excluding the area I represent, namely Pulau Banggi, for the information of this August House and also the Minister responsible for Pulau Banggi. Not less, Pulau Banggi has dozens of beautiful and attractive small islands, clean beaches, coral reefs and diverse marine life, and with the permission of Datuk Speaker, Pulau Banggi has earned the nickname of the longest white sandy beach in Malaysia, only it has never been visited by ministers before this.
So, come, I welcome the Honourable Minister and also the Ministry, come and visit Pulau Banggi and the surrounding islands and help us develop suitable infrastructure to make Pulau Banggi a destination that can help uplift the welfare of the people and also their economy.
Mr Speaker, although it is only one island. Pulau Banggi has an agropolitan, but this agropolitan programme has had little impact on the socio-economic development of the participants involved. Therefore, I would like to request clarification from the Honourable Chief Minister or the Minister of Finance regarding the status of the takeover of this agropolitan, also known as FELCRA, and what the next plans are if the takeover process succeeds in future. I also humbly propose that in developing this area, the government would be better off if efforts were made to bring investors for planting matag coconut, mawar coconut and also pandan coconut, besides other types of fruit such as mango and pineapple. Rearing of swiftlets, cattle, deer, chickens for eggs and also meat, and aquaculture activities such as rearing of grouper, mud crab, nipah crab, prawns and also sea cucumber or balad putih are also very suitable to be developed on this island. All of this has the potential not only to meet the needs of local fisheries supply sources but also has great potential for export markets, so the Ministry of Agriculture should seriously consider this potential and elevate this island as an economic hub to be developed.
Mr Speaker, I would also like to touch on the matter of basic facilities in Pulau Banggi, especially three main matters, namely:- clean water supply, electricity and also roads, which are still at a worrying level and not yet fully enjoyed by the community of Pulau Banggi, including that at certain seasons these facilities are cut off and cannot be felt or used by local residents. Clean water supply, for example, is only felt by 1/3 of more than 30,000 thousand residents, especially those who are on the main island…on the small islands and the rest of the residents who are in the interior, in villages such as to the north of Pulau Banggi, namely…
…Kampung Dogoton, Kampung Semayan, Kampung Lok Agung, Kampung Pulau Sibogoh and several other villages.
This happens because of insufficient water sources, in other words the Banggi water treatment plant does not have a water reservoir pond, the plant capacity is still small, there is damage to the old main pipes that need to be replaced, lack of diesel fuel to start the water pump engine, and sometimes due to damage to the water pump engine itself.
Meanwhile, electricity supply in Pulau Banggi only covers less than 50% including the islands. The rest of the residents on this island only use their own initiative, whether using solar energy, using small genset engines or only using oil lamps at night.
I request the relevant ministry that the existing engines at SESB be replaced with new ones or their number increased, and the installation of electricity poles needs to be carried out to villages that have not yet received electricity supply, and for other islands, allocation for the construction of solar hybrid systems be provided. As for paved road facilities in Pulau Banggi, only 15km from Pekan Kerakit to Kampung Limbak Laut is paved. The rest, estimated at about 100km around this island, is not paved, and in fact the road conditions are very bad and cannot be passed during the rainy season. At the same time, the 15km of paved road is now damaged, with many potholes, and there is no maintenance or repair. This situation is very dangerous to travel on, especially for motorcyclists, particularly at night. I seek the attention of the Minister and also the Ministry of Public Works, and I would like to ask the ministry whether there are plans or efforts to overcome these three issues.
Mr Speaker, for telecommunications facilities in Pulau Banggi, the level is still unsatisfactory. Besides, it has not yet been felt by every place or village on this island. Therefore, there must be efforts to expedite the construction of telecommunication towers, especially in the more interior areas in the north of Pulau Banggi and around islands such as Pulau Balambangan, Pulau Tigabu and also Pulau Manawali.
At the same time, Datuk Speaker, at the same time I call on the Ministry of Youth and Sports to provide suitable sports and recreational facilities such as a sports centre or at least build a district field so that residents around this island can carry out recreational activities and also suitable sports programmes.
On behalf of the community of Pulau Banggi, we request the ministry also to consider building a district futsal court because this sport is very popular among the youth. At least they can fill their leisure time with healthy and beneficial activities.
Datuk Speaker, once again I wish to raise the issue of health facilities to the government and also the relevant ministry, so that the health clinic that currently exists in Pulau Banggi can be upgraded to a hospital, equipped with suitable facilities and equipment as well as reasonable specialist staff, because this island is far separated from the mainland of Kudat. It is feared that when emergencies occur, and during the monsoon season or bad weather, it will be difficult to bring patients out to get treatment at Kudat Hospital and the nearby ones. Datuk Speaker, that is all for my debate this time. Banggi begs to support. Thank you.
Thank you, the Honourable Member for Banggi. For clarification, ya, what is the area of this Pulau Banggi?
Datuk Speaker, about 442 sq km.
Oh, about the size of Singapore, is it?
I think so, roughly.
Okay, thank you. Now I invite the Honourable Member for Kunak.
Bismillahirrahmanirrahim.
15 minutes, okay.
Assalamualaikum warahmatullahi ta'ala wabarakatuh and salam sejahtera. Thank you, Datuk Speaker. Subhanallah, alhamdulillah, first of all, thank you for the opportunity given to me in debating the Government Policy Speech delivered by His Excellency the Yang di-Pertua Negeri of Sabah. Firstly, I would like to take this opportunity to congratulate the Sabah State Legislative Assembly, which has for 60 years successfully administered the governance of this honourable House with full prosperity and excellence.
In the civil service, he'd have retired by now.
Datuk Speaker, based on the Government Policy Speech delivered, we cannot deny that today the government has succeeded in showing improvement.
I am confident that if this government continues to be given opportunities and support, it will certainly bring about better impact. My great hope is also that the support I have just given as the State Assemblyman (ADUN) for Kunak, together with several other ADUN colleagues, will bring more stability so that the government can carry out all its plans without needing to worry about disturbing political dramas. As the representative of ADUN Kunak too, I promise that although I have supported the government, this will not lock my mouth from giving rebukes, suggestions or criticism.
Datuk Speaker, I would like to begin my debate on the matter of Sabah's legacy, namely infrastructure, with the government's determination to expedite the implementation of the Pan Borneo Highway project. We hope the road experience in our month will end, especially for us who have to go through this road every time we return to the home area. Datuk Speaker, two matters I humbly request be given attention.
First, Kunak very much hopes that the Pan Borneo package alignment will pass through the main road of the Kunak district, so that our district economy, which has long been called "Pekan Koboi", can enjoy the spillover of economic activation. Second, I earnestly request that Jalan Tingkayu, about 40km long, be upgraded, and although, to be honest, I accept the constraints of allocation, I hope that the government, especially the Public Works Department, will be firmer in implementing road maintenance by contractors who are paid millions of ringgit every year to truly carry out maintenance work, and the information I received is 10 million for a period of five years. I feel it would be much better if the government upgraded this road phase by phase.
Datuk Speaker, congratulations to the government on its success in implementing high-impact programmes and projects. However, in our excitement at receiving large investors, what calculations and considerations have been made by the government through the Ministry of Industrial Development and Entrepreneurship so that the capacity of water treatment plants, electricity generating stations, including our roads, can cope with the new burden brought by these investors?
What we see is that competition between industry and domestic use is affecting the welfare of the people. Therefore, I suggest that there be an effort to provide special water treatment plants and special electricity supply for industry, especially in industrial estates such as the Palm Oil Industrial Cluster. There is still much room for us to build solar farms in that area. The government's diligence in attracting investors is of course for the benefit of the people of Sabah. So, do not let the presence of these investors be measured only in terms of ringgit value but undermine the welfare of our people. I also appeal and call for the reality of the very weak administration and management of the Water Department to be dealt with drastically. Datuk Speaker, the problem of the electricity supply disruption that has just occurred is very burdensome for the people.
Sorry if I have to agree with the comments of most people who consider the excuse of air-conditioning use to be a rather ridiculous excuse.
Likewise the excuse of hot weather as the cause of electricity rationing in Sabah. The question is, do Sarawak and other states in Malaysia not experience the same thing?
Why is only Sabah affected by this hot weather and these air-conditioning units? We have also been informed about damage to the substations as the reason for the electricity supply problems in Sabah. Let us focus on the root problem, which is the main issue: the inability of our power stations to supply electricity across the whole of Sabah. Where has the projected load forecast gone? And its cause is also that TNB, or more simply the federal side, has failed to add generating capacity in Sabah. The briefing from SESB two days ago proves that since 2018 there has been no construction of new power station capacity in Sabah. Therefore, we very much welcome the Sabah Government's decision to take back regulatory control of SESB from 1 January 2024 as a bold step to fight for Sabah's rights. Datuk Speaker, the Government's Policy Speech has explained matters very comprehensively. Almost every sector has been planned with great care. However, I did not hear the health sector mentioned seriously. I would like to urge the government today to be firm in monitoring and ensuring the delivery of services provided by the Ministry of Health Malaysia. The need to add medical specialists, and the reduction in allocations for purchasing equipment or machinery reaching Sabah very slowly, must be voiced by us. Recently, I took the opportunity to look at the appointment letters for the conversion of contract nurses to permanent, and the placement of phase 2 nurses for 2023, dated 21 April 2023. Out of 358 people, 81 Sabah contract nurses were promoted to permanent, but only four were retained in Sabah, 1.1%. Therefore, imagine the workload that nurses are experiencing in Sabah.
I request the government's explanation on its views regarding the need to re-establish a Sabah Health Ministry so that the state has an agency that is truly dedicated to handling every matter relating to health. Most importantly, that ministry could become the monitor and voice of Sabah's health community so that there is no longer any need to wait for a green light from the federal government, simply because we know that only Sabahans understand the health matters of Sabah more clearly. Datuk Speaker, I am confident that all the strategic plans being implemented are focused on the progress of Sabah and the welfare of its people. However, are we ready to sacrifice the welfare of the people in pursuit of development alone? Allow me to represent the people of Kunak living around Kampung Kunak Jaya and Kampung Bagiang since the 1970s. Several documents are still kept, showing that village residents had applied since the 1970s for this area to be gazetted as a village. However, in 1988 and 1990, this area was already granted as the property of LPPB. Its chairman is seated beside me. The Chairman of LPPB, Datuk Masiung, and after nearly 30 years, now there is a proposal to develop this area and residents are asked to move out.
Datuk Speaker, nearly 2,500 residents are involved. I do not see this matter as easy for us to manage, and the relocation of such a large number of people is not an easy matter. Therefore, I plead that the government kindly help the people of Kunak involved so that this LPPB land is exchanged for land in another area. For the record too, more than 90% of the residents involved are in the hardcore poor category.
Datuk Speaker, congratulations also to the government for focusing on boosting the construction and maintenance of public facilities such as markets, parks and so on. For Kunak, I request that the government give attention to upgrading the single access road into the main fisheries jetty and fish market at Kunak wharf, which is very narrow and has a very serious traffic problem. Especially in the morning, because this same road is used by the people, and also by fish-collecting lorries, and this road is a dead end with no alternative exit except by making a U-turn. I request that road widening involving land filling be carried out in this area. Datuk Speaker, once again we hear of efforts to boost the forestry industry through the development of the recreation and eco-tourism sector by consolidating and upgrading existing Sejadi centres. My question is, what is the government's detailed plan for the Madai Waterfall Sejadi Centre in Kunak, which until now still cannot be visited due to dilapidated and unsafe facilities? Second, what is the government's plan to promote the Blue Hole Ring, also known as the Blue Ring Reef in Kunak, which is of world standard for scuba enthusiasts? For everyone's information, there are only about ten Blue Hole Rings in the world, and Kunak is one of them.
Thirdly, I request an explanation of the government's efforts to obtain permission for access to the attractive tourism areas of the Kunak district, such as the mud pools, hot spring pools, and the Japanese tunnel site located in the Sime Darby area. Unfortunately, Sime Darby does not allow the public to enjoy the beauty of these tourism products.
Datuk Speaker, the poverty rate still does not reflect a contraction. Poverty eradication programmes, especially in rural areas, are very much demanded. Allow me to seek an explanation on the plan for implementing the Pangi Sejahtera Message, Kunak, which clearly still fails to help upgrade the participants in that area.
Datuk Speaker, as a people's fighter who has spoken a great deal about MA63, I personally am very relieved that almost everyone has become aware and dares to raise Sabah's rights under MA63, and most relieving is that our PM 10 too, has continuously given assurance that these rights will be returned.
Therefore, I hope the government does not become complacent with mere speeches. We must work hard so that everything demanded is returned and implemented quickly. I hereby formally request a detailed listing of all the rights that have been returned and those that will soon be implemented. This needs to be shared with the people because it is an indication of the success of the GRS government's struggle in fulfilling the aspirations of the people of Sabah since 1963.
Therefore, as my closing words, I, representing the young leadership in this honourable House, very much hope that Sabah's political leaders will remain open in fighting for the people without being restricted by party differences. Every time there is a problem, there is a cry to replace the government.
Replace the Chief Minister.
As if, when the Chief Minister is replaced, the successor will solve all problems in an instant. This cry is merely a picture of the despair of the opposition, which has held and once held the reins of government, and these problems are still inherited by us. Come on, everyone, let us focus on working, although it is not perfect, the effort towards improvement is clearly there. Alhamdulillah, Kunak has spoken. Kunak respectfully supports, thank you.
Thank you, the Honourable Member for Kunak, who spoke with great passion. Indeed, the young ones say so. Now I invite the Honourable Member for Limbahau.
Thank you, Datuk Speaker. Greetings of peace and greetings of Sabah Maju Jaya. Datuk Speaker, above all, I extend my highest thanks to Datuk Speaker and all Members of the House who…
…who were involved in the debate on the Government's Policy Speech by His Excellency the Yang di-Pertua Negeri Sabah, Tun Datuk Seri Panglima Haji Juhar bin Datuk Haji Mahiruddin, for the Fourth Session of the Sixteenth State Legislative Assembly.
I would also like to extend my thanks for the opportunity given to me to debate the Government's policy today. The water issue has become a hot topic among the people recently, with us forecast to face a continuing extreme El Niño. The water issue will certainly become increasingly urgent to resolve. I am aware that our State Government is taking appropriate steps to overcome the water problem. Nevertheless, allow me to give my input as the People's Representative for the Limbahau State Constituency in particular and Papar in general. I am confident that the time has come for the Limbahau Water Treatment Plant to be upgraded. There is a need to increase water production capacity at this plant to meet the growing demand from consumers in Papar. At present, water supply in Papar is insufficient, and I am informed that additional supply has to be carried out through the emergency water supply scheme in Limbahau. In addition, this plant is also ageing and was built as far back as the 1960s. Therefore, the time has come for this facility to be upgraded to ensure that the Limbahau Water Treatment Plant always has sufficient raw water and meets water demand in Papar and its surrounding areas for the long term. Furthermore, whenever there is heavy rain or drought, the condition of the water in the Papar River becomes extremely turbid, and the Treatment Plant has to be stopped to avoid damage to the
equipment and facilities. When this happens, water rationing has to be carried out. Perhaps this rationing measure needs to be implemented to control the situation. But until when will this situation continue? In this regard, I propose that the government, through the Sabah State Water Department, build a pre-sedimentation tank at the Limbahau Water Treatment Plant to overcome this problem of turbid water. I also propose the construction of a treated water storage system in the Limbahau area to add to or increase water storage capacity in this area. I also fully support the government should the State Government decide to build a dam in Papar, so that the water problem can be resolved not only in Papar but also across the entire West Coast of Sabah, which is currently facing a rather serious water supply problem. Datuk Speaker, I thank the government for its concern in upgrading the Manggis Kaiduan Tampasak Road. However, I found that the Kampung Gunsiang, Bisuang road was not listed in this package. Initially, Kampung Bisuang was indeed listed in this package, but suddenly it was not listed. Therefore, I request that the Ministry of Public Works provide allocation to upgrade the road to Kampung Bisuang and also SK Kaiduan School.
Both locations are rather far from the main road, which takes between 30 to 40 minutes on foot. In addition, road conditions are also poor, especially during rain. Meanwhile, I also request that the Kampung Mikik, Sook, Rampazan road be upgraded under the Public Works Department, and this approximately eight-kilometre stretch needs upgrading for the benefit of nearly 300 residents, and I hope the Ministry can give appropriate attention and upgrade this road urgently.
Datuk Speaker, with the construction of the Pan Borneo Highway, the old Papar to Kota Kinabalu road has now become a route for those commuting from Kota Kinabalu between Papar and Kinarut, as well as users from nearby districts such as Beaufort, Sipitang, Kuala Penyu and Menumbok. To ensure the safety of road users here, I recommend that more street lights be installed along this route, particularly at every U-turn area.
Due to the lack of these facilities, I am saddened to learn that many accidents have occurred in this area, even involving the lives of road users. Datuk Speaker, in this honourable House I once again request that the Government consider my earlier proposal to build fruit stalls at Kampung Manggis, Papar. During fruit season, I see too many people trading on the road shoulders along the Pan Borneo Road. These stalls could be built with a more modern design, which I believe could function as a rest and visit place in Limbahau. If the construction of this infrastructure can be realised, these small-scale sellers can be placed in the lots of these stalls so that they are more orderly. Thus they can trade in a more comfortable place, complete with basic facilities, and their safety is also assured.
Datuk Speaker and the Honourable Members of the State Legislative Assembly, once again I wish to draw attention to the construction of a secondary school in Kampung Gana. Since I was elected as the ADUN for Limbahau, I have never failed to raise or fight for this issue in previous DUN sittings. In my constituency there are 16 primary schools, but there is not a single secondary school, and Kampung Gana is far from the town and the main town centre. A boarding secondary school is greatly needed.
If it is detailed, students from Limbahau in this Limbahau area currently have to attend SMK Kinarut, which has a capacity of only about 1,000 students, and as a result it exceeds capacity. Two school sessions have to be conducted in the hostel.
Moreover, the hostel also cannot accommodate the needs of residents, a number of whom are from the N27 Limbahau area. There are even students who live far from Pekan Kinarut and Papar who sometimes cannot attend learning sessions at school due to lack of vehicles or inability to pay bus fares.
This is a very saddening situation, when these rural children drop out from education and fail to get quality education due to these constraints. So I would like to ask what factors make it difficult to realise the construction of a secondary school in Kampung Gana?
Datuk Speaker, I welcome the State Government's announcement to allocate 1,600 hectares of land in Terusan Sapi for paddy cultivation as a step to strengthen the assurance of rice supply, which is like food.
However, I very much hope that the grievances of paddy farmers in the Papar area will also be given attention by the State Government. The shortage of harvesting and ploughing machinery is still the main obstacle for farmers in maximising their crop yields. At present, I am informed that the padi field area is about 1,000 acres in Papar, and the local Farmers' Organisation has only two machines. Clearly this cannot meet the needs of farmers in this district. Therefore, village residents are trying to bring in the Sabah State Land Board to help cooperate with them to overcome this shortage of machinery. However, as a People's Representative, I would like to request that the relevant Ministry or Government help in this matter.
Datuk Speaker, regarding youth development, I am pleased that the State Government has upgraded community sports facilities such as football fields and multi-purpose courts, particularly in rural areas. In line with the State Government's efforts to foster a sports culture across all levels of society, I also request that a mini stadium be built in the Limbahau area. At present, my area still does not have a specific place for local youths, especially…
…to play sports and for recreation. Datuk Speaker, finally, I would like to take this opportunity to extend Selamat Hari Kaamatan, and may the State of Sabah continue to prosper and be at peace in line with the Sabah Maju Jaya State Development Plan. I hereby request to support the motion. Thank you, Datuk Speaker.
Thank you, Limbahau.nNow we invite the Honourable Member for Kuamut. Only 15 minutes.
Thank you, Datuk Speaker. First of all, before I continue with this speech, I request a ruling from this august House on the name for Sabah. Should we call it a territory or should we call it a state? I am not only confused, but what is happening outside is also confusing, because among our national leaders, when they speak, some call Sabah a territory, while at the same time some of our leaders also refer to Sabah as a state. Thank you, Datuk Speaker.
Datuk Speaker, on 22 May last, all of us were present and all of us heard the policy speech delivered by His Excellency the Yang di-Pertua Negeri. From that speech I can summarise three important points. First, His Excellency wants us in Sabah to hold fast and continue our lives, maintaining unity and harmony. Second, His Excellency congratulated the State Government for being wise in administering and managing our state government. And third, His Excellency requests that the efforts that follow, whether by policy makers or policy implementers, continue to provide the best service for the state and for the future of our children in Sabah.
Datuk Speaker, unfortunately, a few weeks or a few days ago we faced a major problem that we had never predicted and never imagined. Suddenly the whole of Sabah had problems with electricity and water. In my view, Datuk Speaker, it is good that we have a water problem and we have an electricity problem. Why do I say it is good? Because at least the people in the city, these rich people, the Honourable Members, government officers, and towkays, get to feel the darkness and the shortage of water that we in Kuamut have felt for decades. No water, no electricity, which we felt. At least this experience lets us exchange and share the feeling together.
Datuk Speaker, I listened and followed the briefing from SESB and also the Water Department. They said there would be rationing, and I support that, but if they carry out rationing or blackouts and so on, Datuk Speaker, I advise the Water Department and also SESB, please choose the houses of rich people or those government officers with high salaries, or perhaps the Honourable Members. Why do I want these to be chosen? Because when their air-conditioners break down, when their ice boxes break down, when their TVs break down, they have the ability to repair them. Do not choose the housing estates, do not choose the places where the poor people live. Why? Because when the ice box breaks down, the fan breaks down, they have saved money for a year for their children's school expenses, and that money is spent on repairing the ice box and the fan.
Datuk Speaker, the briefing also mentioned that there are 320 million in losses that cannot be collected. I am also surprised, Datuk Speaker. Five years ago in this House I heard a minister responsible for water state that the losses at that time were 200 million, but five years later, instead of decreasing, it has increased to 320 million. Datuk Speaker, what has happened to our Sabah? I have been here since 2008, and today is 2023, so in short, perhaps 13 or 14 years, Datuk Speaker. I have never heard, because I also took part in passing the state budget, that the state's allocation to the ministries has ever been reduced.
Starting from 1 billion, rising to 2 billion, 3 billion, 4 billion, and now more than 4 billion allocated by the government. When the State Government increases its allocation, it means these ministries have also increased their allocations, but the problem has not decreased, it has increased. Who is to blame? We see on social media and also in the briefings that there is water theft, we see pipes with illegal connections and so on, we see illegal connections by SESB and so on.
Datuk Speaker, do not tell me that the SESB officers and the Water Department officers do not know about this problem. Do not tell me that community leaders do not know about this problem, do not tell me that neighbours who steal electricity and steal water do not know about this problem, do not tell me that the bill readers do not know about this problem. They know, but whether they want to solve it or not is another matter. Maybe they want to take action, but when they are asked, "Is there hope, Joe?" when there is hope, action is not taken. This is serious, Datuk Speaker. It must be solved. No matter how many millions or billions the government pours in to solve this problem, it will not be solved if we do not have the will to solve it.
Datuk Speaker, in 2010 I followed and listened to the briefing from SESB and also the water department. Every once in a while, once a term, we receive briefings from agencies or departments, and I attended. One of the things I heard and I raise here: SESB and the Water Department had already told the government and the State Assembly Members at that time that in 2025 there would be an electricity crisis and a water crisis, and why, because..
… the population had already increased, and it would be even worse by 2030. This is what SESB and the Water Department stated. That is why the previous government had undertaken an initiative on how to solve this matter. Among these initiatives was the building of water dams. I do not want to say where, you all already know.
Firstly, this dam was to supply water to the whole of Sabah state, but what is sad, Datuk Speaker, is that politicians raised this issue to boost their popularity, to undermine these efforts so that it would appear the State Government had no sincerity in solving this, together with NGOs who certainly had other objectives too. Until the dam or the dam project was postponed. That was 2010. Likewise, Datuk Speaker, the State Government had read and known that our gas is decreasing. If we use generators, if we use diesel, it is expensive. So an idea was born to open a new source, coal, to be used to power our electricity. Once again, Datuk Speaker, it is sad. Politicians came again, NGOs came again inciting the people, until the government at that time was once again forced to postpone the project, because it was as if it had been publicised that when this dam is built and this coal is mined, it is as if there is a great catastrophe for the state of Sabah, as if we are going to face doomsday, Datuk Speaker.
Datuk Speaker, the answer is today. Indeed, the Water Department is right, SESB is right. Datuk Speaker, I beg us politicians, we civil servants, we must come to our senses for the sake of our beloved state. That is why the GRS leadership under the leadership of the Honourable Chief Minister has raised "Sabah Maju Jaya", which has for a long time been on the State Coat of Arms of Sabah. He raised it not to solve the problem in one day, as the opposition has been crooning. He raised it not to exceed God. Whenever there is a problem, "Sabah Maju Jaya" will solve it.
However, in my reading, the Honourable Chief Minister raised "Sabah Maju Jaya" as an agent to restore our patriotic spirit so that we prioritise our state above everything. Whatever action we take, whatever our affairs, whatever personal interests, forget them. Embed Sabah in our hearts, Sabah First, so that, Datuk Speaker, when all of us have the spirit of our state, patriotic love for our state, believe that there will be no more elements of personal interest, only the interest of this beloved state.
Is this "Sabah First" not including marriage, bah?
Ah?
Is "Sabah First" not including marriage, bah?
Datuk Speaker, in "Sabah Maju Jaya" this is displayed at the front. Sorry Datuk Speaker, I want to show something. What does "maju" mean? We want our state to progress. How does it progress? We must work hard. How does it progress? As I said earlier, forget rank, forget position, forget other interests. Let us together hold the spirit to advance the state of Sabah. When we have progressed, Datuk Speaker, all of us succeed. How could we not succeed? Our water problem is solved, our electricity problem is solved, our road problem is solved, and so on. Investors come bringing billions of ringgit. There are facilities, there are job opportunities for our people. Our people are not unemployed. They have an income, they can go to school, they do not
loiter here and there, which creates an unhealthy social situation. This is what "jaya" means, "Sabah Maju Jaya".
To those who are distorting the meaning of "Sabah Maju Jaya", perhaps they can learn a little from this explanation of mine. Datuk Speaker, is there still time?
Continue, Honourable Member.
Okay Datuk Speaker, ah, …
Do you have a text?
The benefit of the state of Sabah, …
Honourable Member, do you have a text? No, right? It's fine, you can also stop, just continue for now.
Okay, Datuk Speaker, suddenly I remembered a ustaz on TikTok. This ustaz is quite popular, because I also sometimes watch TikTok and so on. I forget his name. Ustaz Das, is it? He told a story about a bridge, Datuk Speaker. He told a story about a bridge. He said there were two friends, best friends. Perhaps you have also heard it. But why I am taking this is because it touches on my own life and I need to share it. He told a story about heaven and hell. So the people in heaven said, "Hi bro, how is it over there?" They said in heaven, it is cool, peaceful and calm. Then the people in hell said, "Eh, can we walk across the road over there? Can we chat over there?" They said yes, but we cannot meet. You cannot go, what is this, from heaven to hell just like that. We must build a bridge, but we meet in the middle. You build from hell to the middle, then I build from heaven to the middle. So he said okay, done. If that is the only problem, it's small, bah. Heaven said, you know, the people of heaven are indeed caring. So the people of hell also built it. They built a project to go to the bridge. According to the ustaz, he said, ah, the first five months, perhaps, 30% complete. Then the next month, 70%. The month after that, 100% of the bridge complete. When it was finished, he went to look at heaven. There was no project from heaven yet. How can we go to heaven? He said, "Oi Jo, where is your bridge? You haven't
built it yet? How do we go to heaven?" Oi… he said, Si Jo, bro, how do we build that bridge? Engineers, contractors, cement sellers, material sellers are on your side, not on our side. I have no consultants, contractors, or anything.
This is just a joke, right? It is not directed at anyone, right?
Ah, so Datuk Speaker …
Ah, Honourable Member? This is just a joke, not directed at anyone?
Tiada.
Okey.
But if anyone feels offended, perhaps I can explain further. Don't let Ustaz Das, do ah, Saad, Dasad make another TikTok, what is it, in a religious talk he says, "Eh Jo, why didn't you do this? Why aren't water, electricity, bridges and roads able to reach heaven …
No, it doesn't reach. Then the angels will say, what is this, the people of heaven say, eh, how can it reach? So please forgive me, so that we all know how I want to do it. Ministers, former ministers, directors, Honourable Members including myself. Ah, to be fair. Directors, all the DAs, the meter readers at your place, not at our place. How do we want to go to heaven? So the knowledge we learn here, Datuk Speaker, although sometimes it touches our hearts, but that is what I said earlier. I was moved by this talk and let this be used as a guide and a reference for us.
Datuk Speaker, it would be unfair for me to end this speech without touching on my constituency. I hold up a thick book called the Tongod District Development Plan 2022-2030, but do not worry, Datuk Speaker, I will not read all of this. My point is this.
I want to tell you to wrap up now.
Yes. My point, Datuk Speaker, is that in the previous sitting, I said I would not read it, but I will give it to the relevant ministers. Because this book is the aspirations, hopes and wishes of the people of Kuamut whom I lead. This idea is not just my idea alone. This is the input of ideas from the people of Kuamut, the government staff in Kuamut and so on. To the ministers to whom I will give it, please do not make this a decoration in the cupboard. Please read it, because this will be your guide on how you can help us in the constituency.
Datuk Speaker, the last point, everyone knows Tongod is a district among the 8 poorest districts. We thank the Federal Government very much for its sincerity and its desire to end the poverty rate in these areas. And thankfully, Datuk Speaker, projects for ICU to rear fish and so on are currently underway. But for your information, Datuk Speaker, the State Government has also done something similar for a long time. What I want to share, Datuk Speaker, is that I am keeping it simple.
I have studied how to reduce the poverty rate in Kuamut. Perhaps this pond, perhaps raising chickens, raising livestock, but this is only temporary. For the short term it is okay, but for the long term, it is simple, Datuk Speaker. Build main roads. Upgrade their agricultural roads so they have facilities to transport their crop produce. The people of Tongod are very hardworking, Datuk Speaker.
Besides the men being handsome, the women are beautiful. Ah, indeed like the Honourable Member for Kuamut, I'm not saying this, Datuk Speaker, this ADUN Liawan, I just want to let you know.
That's their problem if they are like that.
It's a problem indeed. Datuk Speaker, they are hardworking.
All that is left is for us to help them, in any village that does not yet have a main road, for example to Kuamut, to Inarad, to Keronggu and many more, provide roads, Datuk Speaker. As the wind-up of this speech, Datuk Speaker, a summary of the problems we have raised, we in Kuamut once again wish to record our heartfelt thanks to the national leadership, the Honourable Prime Minister Dato Seri Anwar bin Ibrahim, and also the Honourable Chief Minister.
We have seen good relations, even at the Unity Convention, as a result of this good relationship. Everyone knows that the Honourable Prime Minister has given a very high commitment. First, what? Resolving the MA63 that has been delayed. Second, what? He knows we have a water problem, he knows we have many problems. If I am not mistaken, Datuk Speaker, if I may repeat it here. He said, give me two weeks, I will solve it, or I will invite the Honourable Chief Minister to discuss it. Datuk Speaker, I want to ask the government, perhaps two weeks has not yet passed. We do not expect the Chief Minister or the Prime Minister to remember this, as it is their schedule, but please ask the officers to remind the Prime Minister, remind the Chief Minister about this relationship.
Datuk Speaker, lastly, I emphasise once again. Do not be afraid to explore the resources we have, in order to survive, for example for our electricity. We have coal, I myself have surveyed it. We have reserves of more than one hundred million tonnes in Sabah. If we are afraid, I have been to Singapore, I have been to Kuching, I have been to Peninsular Malaysia. Datuk Speaker, only we have not explored this coal for electricity supply. It is just whether we are brave or not, but Datuk Speaker, I ask the government. If this is one of the best options so that we do not have electricity disruptions in the future, why do we want to keep the resources we have?
Why, Datuk Speaker? As an example, I have done a study. I can share it here. The electricity generating capacity we have is only just over six thousand, whereas in Sarawak it is 28,000 megawatts.
Then in Peninsular Malaysia, 125. How far, Datuk Speaker? Are we making excuses because
Peninsular Malaysia does not use coal for electricity? No. Do we still want to deny that Sarawak has also developed its coal for energy? No. They have done so for years, Datuk Speaker, in Singapore, in Peninsular Malaysia, for years, and even in Southeast Asia, we all know it is being used.
Sila gulung.
What is this, coal as electricity? If we follow SESB, we only use natural gas, but Mr Speaker, if there is another gas leak, not just asking for it in the future, imagine all of Sabah being plunged into darkness. So Mr Speaker, I think that is all my speech for this time. Once again I thank you very much for this opportunity and I ask for support. Thank you, Mr Speaker.
Thank you, Honourable Kuamut. With the end of Kuamut's speech, that is the only list of debaters I have for today, unless there is anyone who has not yet given their name and wishes to debate. If not, we shall proceed to the next item on the meeting agenda.
Thank you, Mr Speaker.
Not yet, not yet, not yet, not yet. I have not called you yet.
Oh.
Not yet. My secretary.
He has been listening intently to Kuamut's speech all this time. He forgot where he was supposed to come in.
Winding-up speech on the debate on the question carried out on 23 May 2023
Winding-up speech on the motion debated on 23 May 2023.
Therefore, I now invite the Minister of Science, Technology and Innovation to deliver the winding-up speech. Please proceed. Is the winding-up going to be long?
Thank you. Just a little.
Honourable Minister, long?
Not really. If there is enough time, can…
How many minutes? Maybe 20?
Tidak sampai.
Not up to that? Okay, 20 minutes.
Okay.
Thank you, Mr Speaker.
Bismillahirahmanirahim, assalammualaikum warahmatullahi wabarakatuh, peace be upon you, greetings of peace, greetings of Malaysia Madani, greetings of Sabah Maju Jaya.
Mr Speaker, all praise to the presence of Allah, for by His permission and abundant blessings we are able to attend and gather once again in the First Meeting of the Fourth Session of the Sixteenth Sabah State Legislative Assembly in this honourable chamber. First of all, I record my highest appreciation to His Excellency the Yang di-Pertua Negeri Sabah for the comprehensive and holistic policy address delivered on 22 May 2023, covering all fields including the science, technology and innovation sector, which has been identified as one of the important enablers and catalysts driving the state's socio-development under the Sabah Maju Jaya plan.
On this occasion, I extend my warmest congratulations and commendations to the Honourable Chief Minister, Datuk Seri Panglima Hajiji bin Haji Noor, on the implementation of the Sabah Maju Jaya Development Plan 1.0 2021-2025, which enters its second year this year.
The transformative initiatives through the implementation of this plan demonstrate the government's sincerity and commitment to developing all sectors for the welfare of the people.
I record my thanks to the Honourable Members for the questions and views raised concerning this ministry. The ministry truly takes seriously and is concerned about the issues that have been raised. Studies show that 60% of the economic growth factors of a state and a nation are subject to the intervention of science, technology and innovation.
The ministry records its appreciation to all parties who support the cultivation and empowerment of STIE in Sabah (Science, Technology, Innovation and Economy).
For the information of the Honourable Sebatik and the Honourable Kukusan, and this honourable House, STEM (Science, Technology, Engineering and Mathematics) students at the national level recorded enrolment of 42%, while at the state level it was only 27%. Among the main factors contributing to this low percentage is that science subjects are still regarded as difficult subjects. During the MCO two years ago, Mr Speaker, it dropped by 20%. Alhamdulillah, it has now increased to 27%.
Accordingly, the ministry is actively implementing various initiatives to stimulate public interest in the field of science and technology. Among the main programmes and projects of KSTI is the construction of a Science, Technology and Innovation Centre at the Keningau Library at a cost of RM3 million, expected to be completed by the end of 2023.
This centre will be equipped with the latest technology content based on the basic concepts of science, namely mathematics, physics, biology and chemistry, with an enjoyable and informative environmental diorama.
Apart from that, Mr Speaker, the ministry also plans to implement a high-impact project, namely the construction of a Sabah Science Centre in Kota Kinabalu. KSTI is in the process of identifying a suitable site for the construction of the Sabah Science Centre.
The ministry has succeeded in obtaining approval for the construction of Science Centres at the Sabah State Library Tawau Branch and the Sabah State Library Sandakan Branch, valued at RM10.2 million from Petronas. RM5.1 million for each one. It is hoped that cooperation with Petronas can be continued at all the remaining 20 state library branches to establish science centres in their respective libraries.
The Sabah Ministry of Science, Technology and Innovation (KSTI) will continue its efforts to cultivate science through programmes for the cultivation and adaptation of STI/STEM, with strategic partners from the federal level as well as agencies within and outside the country. Among the STEM cultivation programmes implemented this year there are ten. Three of them; first, with MOSTI. The Sabah Science Carnival 2023 in conjunction with National Science Week, in collaboration with MOSTI.
Second, in collaboration with the National Academy of Science. The Borneo Science Expedition and a joint programme with PPD, STEM, FIESTA at 24 District Education Offices. We are providing assistance to PPDs across all districts to establish this programme.
Mr Speaker, the potential for the development of Science, Technology and Innovation in this state is also expected to increase with the entry of 50 science and technology exhibition items from China. This programme will be realised at the end of this year. Insya-Allah. After my ministry and the Chinese Consulate sign a memorandum of understanding which will be implemented in the near future. Mr Speaker, my ministry is also strengthening technology- and innovation-based programmes to equip young people with
various skills and thereby enable them to adapt to new technology. Among the programmes implemented are coding and robotics, such as the Roboneo Programme, Sabah Data Fest, Borneo Tech Summit and Malaysia Techlympics.
Understanding the marketability needs of creative talent in Sabah, the Sabah Creative Economy and Innovation Centre (SCENIC) has organised various capacity-building initiatives through the SCENIC Creative Academy, which is also the first certified Toon Boom training centre in Malaysia, recognised by the Malaysia Digital Economy Corporation (MDEC). Toon Boom is a 2D animation application software based in Canada. Toon Boom software is the industry standard in the animation field and is widely used by major animation companies around the world. The SCA curriculum through the Toon Boom Industrial Bridging Programme is aligned with the latest industry requirements so that our creative talent is equipped with the elements required by the real industry. Mr Speaker, to improve the government's service delivery system, this ministry will continue to implement ICT development through the State Computer Services Department. The ICT Action Plan or ICT Blueprint for the state of Sabah is currently being prepared and is expected to be published in mid-2024. This ICT Action Plan aims, among other things, to provide a flexible platform that is future-proof, which is ready to host and integrate applications, whether small or large and complex.
This action framework covers aspects related to Artificial Intelligence or smart intelligence, ICT development for the digital economy, the use of ICT technology in agriculture, fisheries, livestock, tourism, industry, rural development and poverty eradication, as well as establishing enactments and authorities to regulate ICT development in Sabah. It is important to ensure that Sabah can harness digital technology to drive economic growth, create new employment opportunities and play a role in achieving the goals of the national and state digital economy development initiatives. This initiative is indeed aligned with the aspirations debated by YB Moyog.
This year, more State Government premises will enjoy internet network facilities with faster speeds and be provided with WIFI facilities. This programme is part of the ministry's continuous effort to modernise the State Government's network infrastructure. These facilities will also be extended to the community visiting government premises to obtain the services of certain agencies.
...furthermore, as an effort to adopt and utilise emerging new technology in public sector digital information, the JPKN, in terms of cyber security, will use artificial intelligence to monitor, control, identify and ensure that the cyber security and information security of the State Government will continue to be preserved. KSTI is working together with… with Cyber Security Malaysia in the context of strengthening cyber security. In the effort towards an integrated single source of information, namely the production of dashboards in every ministry and agency. The JPKN will continue to guide and assist in integrating the application systems of agencies that are ready.
This year, five Ministries are targeted to produce their own dashboards. The JPKN is also working to expand application systems across all agencies and is prepared for the implementation of online transactions, digital signatures and digital certificates. ICT development in the State Public Service sector is aligned with the national strategic plan for public sector digitalisation.
For the information of Yang Berhormat Moyog, ICT- and language-related courses are also provided free of charge to the people of Sabah. These courses are coordinated by a company that was appointed by the previous government. A total of 112 ICT-related courses have been offered and more than 500 participants have benefited from the courses organised since 2011. The Honourable Members are requested to encourage the people in their respective constituencies to
participate in the courses offered. Information can be obtained from the KSTI website. Following the issue of unemployment and human capital…
Honourable Datuk, Honourable Datuk Speaker. Mr Speaker? May I interject briefly? Thank you for the reply of the Honourable Minister. Erm, what I wanted to ask is whether there is permission that only one institution has been appointed by the government to conduct courses, ah, language, ICT and so on? And it has been given, what I obtained as information from the 2017 audit report, which other audits do not mention. But in 2017, it stated that, ah, this college had received as much as 28 million as, ah, scholarship or value scholarship was given to them under the contract that was signed. I want to ask the Minister, why was the opportunity not given to other institutions, ah, that may have more expertise and skills, ah, better than, better than this college. Ah, thank you.
Thank you, Honourable Moyog. For your information, ah, this contract was sealed from 15 December 2010 to 2025. Ah, since the previous government, then continued, then extended by us until 2025. We are currently, erm, conducting a study…
Honourable Datuk, can this contract be reviewed or terminated? So that there is, ah, more, what is this, a more innovative way of providing opportunities to our students in Sabah. Thank you.
Apart from, ah, courses like these, YB, Honourable Moyog, we also have courses conducted at other agencies, including those under KSTI, which relate to training including IR4.0, Toon Boon which I mentioned earlier, and this is to further expand to, ah, the people as a whole, and when we place it only under ministries and agencies, it is not enough for us to implement it.
But Honourable Datuk, erm, there are many institutions such as the Coding Institute or institutions that, ah, have more expertise. Maybe, ah, I don't know who, but I am of the view that many institutions in Sabah can conduct the same courses or better than this singular monopoly institute. Thank you.
We will look into the suggestions and views, Honourable Member.
Mr Speaker, following the issue of unemployment and human capital raised by Honourable Moyog, Honourable Sebatik, Honourable Sekong and Honourable Sri Tanjong, including Honourable Sulabayan. The Department of Statistics Malaysia 2022 statistics show that the unemployment rate in the state, at state level, has decreased from 8.1% to 7.7%, from 176,700 to 169,800, as a result of various initiatives implemented by the, ah, government, KSTI and various agencies.
Among the initiatives planned by the ministry this year is the implementation of 91 skills courses, namely 59 short-term skills courses, 10 long-term skills courses and 22 special skills courses (strategic cooperation) through JPSM. These courses will benefit 1,774 people in 73 State Assembly constituencies (DUN). In addition, this department is also implementing three, ah, Sabah Entrepreneurship Programmes (STEP) this year. The Institute of Technical and Commercial Training (ILTP) also provides training to support these efforts. For the information of this honourable House, employment marketability programmes such as the Career Carnival organised jointly by JPSM and the Social Security Organisation (PERKESO) have also succeeded in placing a total of 36,000 youths in various employment sectors from 2021 to 2023. A total of 10 series of Career Carnivals are planned this year, insya-Allah. KSTI, PERKESO and the Labour Department will hold discussions with the Department of Statistics Malaysia to refine unemployment data in Sabah by taking into account Sabah's children who work outside, especially in Peninsular Malaysia, because these statistics need to take into account our children who work in Peninsular Malaysia as well. As happened before, erm, vaccination statistics, we had a lower percentage, ah, because some had already been vaccinated in Peninsular Malaysia…
Honourable Datuk, may I ask, Mr Speaker?
Ah, to interject.
Honourable Datuk, is there data? I understand you will look into it, but Honourable Datuk may also know and have a lot of information that many Sabahans, perhaps the youth and also those who are a bit older, want to leave Sabah because they cannot get a good salary in Sabah, they have no employment opportunities in Sabah, or they feel they have no, what is this, skills, or their skills cannot get them jobs in Sabah, erm, they do not get employment qualifications in Sabah because either they're over qualified or, ah, they lack the skill set. So, we envision, Mr Speaker, with all these young people leaving Sabah within the next five or 10 years, we may only be left with people of our age here in Sabah. All the young people have left Sabah, so we have to create a dynamism in Sabah, where we call them back. But we need the industry, we need the skill sets and we must also appreciate them. Will this data also be released by Honourable Datuk, your Ministry, ah, how can we mitigate, reduce the possibility of losing talent in Sabah. Thank you.
Yes, erm, sorry Mr Speaker, perhaps earlier Moyog talked about the software, but now I mention the halfway. For example in Sandakan, there is Sungai Batang, there is that education hub, eh, now there are only three universities there. Not universities, you know, like the Vocational School there. Only three. Err, if students want to eat or some want to buy something, want an ATM, what, want to go to the library, they have to go down to town again. Because from 10 they take Grab, what, the cost is high. There is nothing there at all, no buildings, if possible, the place is basically the base for lembuk excrement or other animals. My, or what, halfway measures, I did go to KL and met the Minister of Higher Education. He said, has there not yet been a plan for this education hub? I said, can those people who don't have any interest, can they be switched? Switched to go to foreign universities or local universities, UUM or wherever, whoever is interested, come to Sandakan. So, young people, do not go to KL, Singapore, Australia, or other places. I think, err, your child is also overseas too. Thank you, Minister.
Thank you, Moyog, and ah,…
Ah, Minister. May I speak a little? Honourable Member…
If you want to interject, tell me and I can ask the Minister. Sometimes it will jeopardise his position in giving smooth progress, yes. Sorry. Continue, Minister.
Thank you, Moyog and Elopura.
Elopura.
We are, we are trying what I was asked by Moyog earlier, the effort to obtain and gather data, and now at the intermediate stage we are working on it, and the suggestions from Moyog, if there is anything new we will take into account, and we will always cooperate. Likewise, the suggestion from Elopura earlier is also a suggestion from Honourable Senallang, regarding institutions that need to fill the education hub in Sandakan. We welcome it, as Elopura suggested, if there are any. If there are any from overseas, ahlan wasahlan, we welcome them. Thank you.
Sorry Minister, sorry Minister, sorry Speaker. I have written more than 40 letters to go overseas or to these three other places.
We will discuss it later. (overlapping voices)
Nobody answers us, because I am the opposition. Yes, thank you.
I will contact the Honourable Member for Elopura. Thank you.
In addition, other ministries, especially the Ministry of Industrial Development and Entrepreneurship, also play an important role in providing job opportunities, and this is why our Honourable Chief Minister and other colleagues in the relevant Cabinet are striving to bring more investors to Sabah so that our children can study and work. Study and work in Sabah, as all of the Honourable Members wish.
I am pleased to inform the Honourable Member for Sebatik that the Ministry of Science, Technology and Innovation (KSTI) is planning to establish five (5) TVET JPSM satellite campuses to expand access to vocational training. This has also been raised by several of our YBs. Assessments are being carried out to examine development potential in Telupid, Pitas, Kota Marudu, Sipitang, Semporna and Keningau. Allocations will be applied for in the RMK-13. KSTI also proposes the establishment of one (1) more TVET centre in a border town area, to be developed in future. Mr Speaker, I am pleased to inform the Honourable Member for Sindumin, the Honourable Member for Sebatik, the Honourable Member for Merotai, the Honourable Member for Kemabong, the Honourable Member for Nabawan and the Honourable Member for Gum-Gum that, in line with the State Government's goal of becoming a high-technology state, it is the main focus of the ministry to improve and expand internet coverage, especially in rural and remote areas of this state, in cooperation with the Malaysian Communications and Multimedia Commission (MCMC). This has also been raised a lot by all our colleagues.
Through the National Digital Network Plan (JENDELA), several frameworks have already been planned, such as the construction of new towers, the upgrading of existing towers to 4G services, the expansion of fibre optic service provision and the provision of satellite broadband. Among the projects that have been implemented, 169 out of 616 towers planned have been completed. That is, of 616 towers planned, 169 are completed. Of 4,186 transmitter stations planned, 4,159 of them have been upgraded to 4G.
Of 303,569 premises planned to be served with gigabit-speed fibre, 180,346 are already available. 139 VSAT broadband service locations under MCMC and 23 VSATs under KSTI have been fully completed.
For the implementation of the 5G network expansion, a total of 243 sites have begun operating out of 624 sites planned. 624 planned, 243 completed. Meanwhile, 381 sites are still under implementation. As of the first quarter of 2023, the percentage of 5G coverage in the area…
Mr Speaker, may I interject.
Just a moment, YB. The population of Sabah has reached 29.0%. Please.
Honourable Minister, I heard just now that the Honourable Minister mentioned how many towers have been completed in Sabah. I seek clarification from the Honourable Minister on the areas in Semporna, including my constituency of Bugaya, because I have raised this matter several times in the previous session, and I seek clarification from the Honourable Minister on how many branches, or towers, that have been completed are in the Semporna area, particularly in Bugaya?
Honourable Minister, please continue with the Tungku area as well, how many towers and initiatives have been completed. Thank you.
Thank you. Semporna, Honourable Member for Bugaya: planning for 20 new towers, eight new towers completed. Then, planning for upgrading 120 transmitters, 120 transmitter upgrades completed. Planning for connections to premises, we planned 7,204, of which 4,990 are completed. Then, planning for two satellite BWS, two completed. Planning for five PD, five completed. In Semporna we have done a PoP so as to make it easier for our children to get the coverage on Pulau Bum Bum and there is an SK. This PoP is for coverage at the school and can provide coverage of less than two kilometres and it can be used by the local residents.
Lahad Datu, Tungku. Lahad Datu, 47 planned new towers, nine (9) have been completed. Lahad Datu planned upgrading of transmitters 413409, upgrading completed. Then, planned connections to premises 9000, we planned 9610, and 8387 completed.
For Tungku, Tungku planned 19 new towers, one (1) completed. Insya-Allah, we will work on it, Honourable Member. We will ensure that these JENDELA towers this year, the number provided, we will strive so that 2023 will be completed as we need. So far there are 300 that we need to complete. There, we will work on it. I have already called a meeting of this infra-digital committee to call the companies concerned to ensure that in 2023 we get what we have planned. Insya-Allah.
Can the Honourable Minister tell me the reason for the delay in this construction in the Tungku area? So much so that only one (1) of the 19 planned has been completed. Even if they want to be completed by the end of this year, I don't think it is possible for the other 18 to be completed.
This is what we planned, not this year. The following year. These nine (9). But it includes some that must be completed in 2023. Okay YB, we will liaise later on whatever. No problem.
Mr Speaker…
Honourable Member, Honourable Minister.
Ya.
May I just? Honourable Minister, may I suggest, if possible, that every State Assemblyman be given written information regarding the towers that are proposed or have been built? Thank you.
Yes YB, we have a website…
You can visit MCMC's website there. We can find everything, parliament, and now we will do it for the state assemblies. So far, parliament. The entire parliament. We will do it for all the state assemblies. Insya-Allah. Thank you. As for the rest, I have already answered earlier.
Mr Speaker, I have only a little time left. I will go on to, as EXCO for education, touch on several matters relating to education that have been entrusted to me in an effort to empower human capital. The assistance that was approved and initiated earlier by our Honourable Chief Minister, let it continue, and thankfully it has benefited many of our children.
For example, the Higher Education Institution (IPT) Online Registration Cash Assistance, BUDI. Ten million that benefited 5,000 students, with assistance of 1,500 diploma holders, 2,000 degree holders, of the 5,000 eligible to receive. The Special Examination Cash Assistance (BAKTI), 7.5 million allocated. 38,000 of our children, SPM, STPM, STAM, received this benefit. The Computer Aid Assistance for Students (BAIK). This is for IPT students, YBs if there are any. 1,000 IPT students with an allocation of two million. Teacher activity assistance, this is the part that has just been applied for. I ask the YBs to take note. Inform the PIBG chairpersons, the PIBG Chairperson. Some of them have not applied. We have an allocation for 2,000, one per PIBG. So, YBs do not need to give allocations again. If there are additions, it is also good for schools, for the PIBG. 2,000 per PIBG. Religious schools, national schools, secondary schools, Chinese schools and people's religious schools, all receive it. PIBG. 2,000. So, I ask the ministry at the office.
Honourable Minister, yes, just a little.
Ya.
Regarding this PIBG. Sometimes, they think, for example among us, they assume that we are the opposition, and whether the PIBG can apply through us and we apply to the ministry. Let it be clear so that the people outside or the PIBG or the school, whether we are not recognised or we are recognised to apply and help with the application.
Yes, Honourable Member. Through YB and through the PPM it is also possible, the UPPM. List them with account numbers. There is also the problem of PIBGs without account numbers. So we cannot give. There was a YB of ours who sent a list of twenty national schools and religious schools. That is easier, and I hope so.
Thank you, Honourable Minister. Insya-Allah, we will follow up after this.
You're welcome. Then, the Teacher Excellence Assistance (AKSA). For this assistance, a total of 50,000 is allocated. AKSA is for our children who excel in the curriculum and co-curriculum.
At national and international levels, they will receive certificates and cash from us. Recently, we gave some of our children, our students who were successful at the SEA Games. They won medals.
Then, the Sabah School Aid Assistance (BISBA), assistance in the form of school equipment such as smart TVs, portable speakers, portable air-conditioners. There is also an allocation for secondary schools, primary schools, religious schools and so on. Last year, we delivered and this was also approved by our Honourable Chief Minister. The School Minor Maintenance Assistance (BALKIS), I announced this last year and thankfully I asked for everyone's cooperation. So, these are some of them. I thank you once again. I ask for support. That is all.
Speaker. Give way a little. (Overlapping voices)
Thank you, Honourable Minister, and now I invite the Minister of Tourism, Culture and Environment. Please, Minister.
Thank you, Datuk Speaker. I extend my gratitude to His Excellency the Yang di-Pertua Negeri of Sabah for the government policy speech delivered in this august House on 22 May 2023. In line with the aspirations of the State Government through the Twelfth Malaysia Plan and also the direction of Sabah Maju Jaya, my ministry is always committed to ensuring that the government's targets under the ministry's portfolio are achieved.
Datuk Speaker, since the easing of the Movement Control Order (Recovery) at around the third quarter of 2021, my ministry, through the Sabah Tourism Board, has drawn up and implemented domestic and international promotion based on four main strategies towards recovery, among them are: 1.
Strengthening consumer confidence; 2.
Supporting industry players; 3.
Enhancing potential segments; and 4.
Rebuilding the northern route network.
Datuk Speaker, the momentum. The momentum of the tourism sector has begun to be felt with the presence of international tourists from China, Korea, Brunei Darussalam and Singapore in several tourist areas of this state. It is a positive development seen for this state, and my ministry will continue to ensure that the readiness of tourism industry players is at a high level, directed towards better and more stable economic growth. At the same time, the environment and cultural heritage, which are the main assets of the state's tourism, will remain preserved and restored.
In the tourism sector, Datuk Speaker, based on the positive developments of the state's tourism sector. At this time, my ministry is very confident that the arrivals of domestic and international tourists can reach up to 2.2 million, with estimated tourist receipts of approximately RM4 billion this year. This is driven by the restoration of domestic and international air networks to this state.
As of February 2023, tourist arrivals to this state totalled 366,988 people, compared with 2022, when 200,027 people came in the same period. An increase of 83.5% compared with the previous year, this. Meanwhile, for the aviation industry, domestic flights at this time have recorded 396 flights a week from Kuala Lumpur, Johor Bahru, Penang, Kota Bahru and Sarawak.
Meanwhile, for international flights there are 93 flights a week from Singapore, Taipei, South Korea, the Philippines and several regions in China. Datuk Speaker, I am pleased to inform this august House.
Datuk Speaker.
Honourable Minister.
The State of Sabah will receive.
Honourable Minister, there is an interjection. Do you want to give way? From Senallang.
Let me finish first or half first. It's still long, oh. Sorry, ah.
(Suara Bertindih) We’re worried.. The point. If I ask you. If the subject is different.
[Suara Bertindih] I have to finish it, at least half.
[Suara Bertindih] Then, I am worried that you’re not able to recall that.
You must ask nowkah?
That’s it, normally, in this, when the subject matters is discuss.
Honourable Minister, it is up to the Honourable Minister whether to give way or not.
I seek permission from Mr Speaker.
I apologise to…
Datuk Seri, can you, give me 10 more minutes.
Okey, okey.
Okey, Thank you very much. I will be you. Very fast.
Datuk Speaker, I am pleased to inform this august House that the State of Sabah will receive direct flight services from several more cities in China starting this June, namely AirAsia flights from Beijing three times a week, starting 2 July 2023, flights from Macau four times a week, starting 16 July 2023, and flights from Guangzhou, starting 1 June 2023, three times a week by China Southern Airlines. This positive improvement in the air transport network can further boost the momentum of the state's tourism industry, and my ministry is committed to discussing and expanding cooperation with airlines in potential countries this year, such as Australia and the Middle East countries. Okay.
With the permission of Datuk Speaker.
Silakan Senallang.
Terima kasih Yang Berhormat Menteri yang telah mengulas tentang sektor pelancongan. Cuma, saya telah mendengar what do you have said just now dengan izin mungkin you can digest if i speak in english better then bahasa. So, i do hoped that the mean in Dewan you can use all your answer in English anyway. So, i think what is important your better able to comprehend what i am going to ask you. I said you already
highlight with the guard to international tourist overseas. But, i’m asking about domestic as well.
You have highlight Airline will be coming in out out and in AirAsia from China from so many part of the world. But, just wonder how your going to enhance the domestic tourism in this country while we realize that currently there is only Firefly, there is only Firefly going not only from Tawau to KK, from KK to Sandakan. And the load this so small and how can u entice and how can u encourage people giving convenience for them comfortable for them to travel when only using a propeller to engine like that rather then if you have seen flight from KL to Johor, flight from KL to Langkawi, flight from KL to Alor Setar and Penang MAS 737. It’s can load more than how many peoples there. But, it’s doesn’t biased there, i mean what is the action taken by the government of the day to ensure that it must also be a level flying field. You know, giving that sort of encouragement so that, we can produce an incentive to encourage people not only about tourism from outside but also domestic tourism. Thank you.
Terima kasih soalan tersebut. Just to be very clear. This is actually the first part of my speech di belakang adalah i mention Airlines going to Tawau to Sandakan. So, that’s why just now i mohon maaf i give me a bit time we will explain.
Sorry, distrub Datuk Speaker. Can i just ask? Boleh saya tanya YB Menteri. You might as well get prepared the answer so I give her in advance. Emm, dengan izin boleh saya perbahasan menyoal dalam bahasa Inggeris. Er, YB Menteri with the advance of all this domestic airlines and you bite me talking about, are you open for Sky policy? and will be that be Hala Tuju of the State Government. Emm, where we can meet again state airlines, focus on open polices Increases our load by working together the hotel, the resort, and another tourism institution where you no need to wasted your money airlines in Sabah. An also at the same time when we talk about days, take a drive as a Minister and try to get a parking in KKIA, imagine its horrible you can't even pay a decent ticket and there have ah and blackout, no water and have you. So, don’t talk about
tourism tourist coming in when we can’t even handle our simple basic simple infrastructure. Thank you.
Thank you emm, Yang Berhormat dari Moyog. The international, can I answer now those the I don’t want to wait the last minute and there are. The international tourism kita baru buka itu border. We know that, March only this year we start baru buka, and there are some countries saya tidak akan sebut nama-nama country itu there have this what we called this policies of ah not allowing their tourist to certain area in the East Coast. Its is still on. That’s is why we are now opening up to the international involve but encourage some are they come but that divert that intention to Sandakan and to Tawau. This one i will sebut later. So, about the parking lot ahh. I think this is out of my hand u know i can bring it up to the MAS…
Malaysian Airport Berhad but overall you are the state government ah, its has a fact over your tourism enticement of people to coming because basic decent thing also can’t be manage.
Yes, Yes. I understand what u mean, and i feel the same where as well. Ah, because other then that tourist coming to Sabah, the first part is the Airport. And the airport plays the important role. Not only, not only ahh.
YB Elopura, can you sit down for little while first, give Menteri a chance to answer the two question first.
Yeah, yeah. After the answer finish.
A later on please.
Deputy Speaker [Datuk Haji Ahmad Abdul Rahman]:: Sit down first.
So… ahh, I would like to mention ah…
Do touch on the Open Sky Policies. Thank you.
The policy of certain country that they don’t allowed there are tourist or there are certain part of the state.
Yang Berhormat, Yang Berhormat we don’t want to have a dialogue in this place. Can u let the Minister ask answer question later on, if your feel not been answered. Tanya dia lagi. Yeah.
To answer the first question ah, about the whether the international tourist come in and what do we do in term we divert them we market them and for your information we are now in the process of chattering ah chatter flight from South Korea direct to Tawau already. We start already. So, they don’t have a regular price now but we are now moving on. Okey.
Yeah, okey.
Yang Berhormat Menteri, do you want to give way to Elopura. Yes or no?
I’m very sorry, uh can i finish first.
Yes, Elopura.
I am afraid, I am afraid like the Minister just now, because I want to stand up later.
He won't run away.
No, no, don't be afraid. I will not run away. I will be here don’t worry.
Please carry on.
Thank you very much Speaker. Datuk Speaker. Datuk Speaker, to empower the tourism industry of this state, and as preparation towards the coming Visit Malaysia Year, various initiatives have been and need to be planned, especially in the development of new tourism products and facilities, particularly in areas that are tourist hotspots. This is also an effort to add value and increase the capacity of tourists, as well as to make these areas a preferred destination that must be visited in this state. Among the tourism development initiatives are first, improving tourism facilities at Pulau Manukan, improving tourist facilities at the Poring Hot Springs, Ranau, and upgrading the Lok Kawi Wildlife Park as a Night Safari. At this time, the ministry is in the process of identifying potential, interested investors, and detailed discussions are still being conducted between the ministry and the investors. Datuk Speaker, sustainable management of nature, and the preservation of biodiversity, are the main pillars for sustaining the natural treasures to be enjoyed by future generations, the wealth of resources…
Alam semula jadi ini merupakan aset utama produk pelancongan negeri ini. Justeru itu, kementerian saya melalui Sabah Parks (Taman-taman Sabah) akan melaksanakan satu penambahbaikan pintu gerbang Pondok Timpohon di Taman Kinabalu Ranau, penaiktarafan jeti Pulau Manukan di Taman Tunku Abdul Rahman Kota Kinabalu, penambahbaikan kemudahan perkelahan di Air Terjun Sandakan, di
Taman Banjaran Crocker, Keningau dan pembinaan Bangunan Galeri Hidupan Marin di Taman Tun Mustapha, Kudat.
Pada tahun ini, Sabah Parks (Taman-taman Sabah) juga akan melaksanakan satu projek flag ship di bawah hala tuju Sabah Maju Jaya dengan pembinaan Pusat Latihan Pendakian altitude tinggi atau High Altitude Training Centre di atas Gunung Kinabalu. Pembinaan pusat latihan khas ini akan menyediakan kemudahan latihan pendakian gunung yang bertaraf dunia untuk mempersiapkan para pendaki elit dari seluruh dunia yang berhajat untuk mendaki Gunung Everest.
Datuk Speaker, dari aspek pengurusan hidupan liar yang menjadi tarikan utama pelancongan bagi pasaran Eropah. Program-program penguatkuasaan pengawalan dan kajian-kajian hidupan liar menjadi antara program yang akan ditekankan pada tahun ini. Penaiktarafan exhibit kajian di Taman Hidupan Liar Lok Kawi adalah merupakan fokus utama kementerian dalam menambah baik pengurusan dan fasiliti gajah demi memastikan kebajikan dan keselamatan kakitangan hidupan liar terpelihara dan juga kebajikan gajah tersebut.
Dari aspek kelestarian pengurusan alam sekitar secara mampan pemeliharaan serta pemuliharaan khazanah alam semula jadi akan tetap menjadi keutamaan pada masa sama mengimbangi keperluan pembangunan ekonomi masyarakat di samping menerapkan tanggungjawab bersama masyarakat dalam memastikan pembangunan Negeri Sabah tidak ___ kepelbagaian biologi alam sekitar dan keunikan budaya masyarakatnya yang unik.
Justeru pelbagai program dan aktiviti sama ada di peringkat akademik mahupun peringkat profesional telah dilaksanakan dan akan terus dilaksanakan untuk memastikan pembangunan di Negeri Sabah seiring dengan pengurusan alam sekitar yang teratur, terancang dan bersepadu.
Datuk Speaker, hubungan etnik yang harmoni merupakan kunci keamanan dan kemakmuran sesebuah kerajaan khususnya negeri yang mempunyai pelbagai etnik dan agama. Bagi menjadikan Sabah sebuah negeri yang kekal aman dan unik serta maju pembangunan pelancongan berasaskan budaya.
Kementerian saya akan meneruskan dan memperbanyakkan program-program pembudayaan yang mampu menjadi satu pengalaman kepada para pelancong yang berkunjung di negeri ini. Disamping itu juga kementerian saya akan berusaha merancang dalam membangunkan cultural village di Kinarut agar kepentingan warisan khazanah yang tidak ternilai dapat dilindungi malah berpotensi meningkatkan pendapatan dari limpahan ekonomi ini.
Datuk Speaker, sebelum saya menjawab soalan-soalan yang telah dibangkitkan oleh Ahli-ahli Yang Berhormat dalam perbahasan, saya ingin merakamkan ucapan terima kasih atas saranan dan cadangan yang telah dikemukakan kepada kementerian saya. Kementerian mengalu-alukan cadangan dan saranan Ahli-ahli Yang Berhormat agar kita bersama-sama membantu memulihkan serta meningkatkan lagi kualiti sektor pelancongan negeri ke peringkat lebih tinggi, melestarikan alam sekitar dan kebudayaan.
Dengan itu, izinkan saya memberi penjelasan kepada beberapa isu yang telah dibangkitkan kepada kementerian saya.
Datuk Speaker, bagi menjawab Ahli Yang Berhormat N35 Sindumin berhubung bajet yang diperuntukan untuk tujuan promosi pada Tahun 2023, jumlah peruntukan bajet untuk mempromosi Sabah sebagai destinasi pelancongan di peringkat kebangsaan dan antarabangsa untuk Tahun 2023 adalah sebanyak RM11.35 juta. Peruntukan ini adalah merangkumi promosi dan pemasaran dalam dan luar negara termasuklah bagi acara business events.
Datuk Speaker, berhubung pertanyaan Yang Berhormat Sinduman berkenaan peruntukan kepada komuniti pelancongan luar bandar. Untuk makluman Yang Berhormat, bagi menyokong pembangunan fizikal pelancongan luar bandar dalam Rancangan Malaysia Ke-12, kementerian saya telah diperuntukan sebanyak RM6 juta pada tahun ini di bawah program pembangunan pelancongan luar bandar. Peruntukan ini adalah melibatkan penaiktarafan dan penambahbaikan di kawasan-kawasan pelancongan yang sering dilawati oleh para pelancong dan kawasan yang dijalankan oleh komuniti setempat termasuklah Community Based Tourism.
Selain daripada peruntukan di bawah RMKe-12 ini, kementerian saya melalui Sabah Tourism Board (Lembaga Pelancongan Sabah) juga telah memperuntukan sejumlah RM1.25 juta kepada 27 persatuan pelancongan daerah bagi tujuan bantuan sokongan produk pada tahun ini. Datuk Speaker, Kementerian saya mengalu-alukan dengan…
Datuk Speaker, minta laluan.
Bolehkah saya habiskan?
Penjelasan. Boleh?
Mahu beri laluan Menteri?
No. No. No.
Tidak. Dia tidak beri.
Sorry saya 10 minit lagi 10 minit lagi.
Sila duduk Yang Berhormat Sindumin.
Okey. Mungkin lepas inilah.
Kementerian saya mengalu-alukan dengan saranan Yang Berhormat Sindumin agar kerajaan mencantikkan bandar dan pintu masuk utama pelancong. Kementerian bersedia untuk bekerjasama dengan Kota Kinabalu City Hall (Dewan Bandaraya Kota Kinabalu) (DBKK) dan pihak berkuasa tempatan untuk mencantikkan landskap dan juga memulihara dan memelihara mana-mana bangunan bersejarah yang berpotensi untuk dijadikan produk pelancongan.
Datuk Speaker, untuk menjawab soalan Yang Berhormat N56, Tanjong Papat berkenaan kawasan pelancongan yang perlu dipromosi di Daerah Sandakan. Sukacita saya memaklumkan kementerian saya melalui Sabah Tourism Board (Lembaga Pelancongan Sabah) mempromosikan Sandakan sebagai salah satu destinasi pelancongan yang harus diterokai oleh para pelancong khususnya pasaran antarabangsa. Malah, Sandakan sudah pun dikenali dan dipromosikan sebagai Get Way To Nature and Wild Life.
Selain itu, Sandakan juga telah dipromosikan ke pasaran high end di Amerika Syarikat.
… syarikat Tanjung Park melalui syarikat berprestij tinggi, iaitu National Geographic dan Upper Compact and Camp. Pelancong-pelancong berprofil tinggi ini diterbangkan dengan pesawat jet peribadi untuk menerokai pelbagai negara di seluruh dunia dan Sandakan adalah destinasi yang terpilih bagi perhentian-perhentian mereka di Malaysia.
Di samping itu, Sabah Tourism Board (Lembaga Pelancongan Sabah) telah menghasilkan satu pangkalan data berbentuk risalah yang ditambahkan “things to do in the district of Sabah” di mana maklumat mengenai tempat-tempat pelancongan, produk-produk pelancongan, tempat-tempat pelancongan berasaskan komuniti dan tempat-tempat bersejarah di seluruh daerah di Sabah direkodkan. Ini termasuk daerah Sandakan. Laman web di Sabah Tourism Board (Lembaga Pelancongan Sabah) juga mempamerkan maklumat-maklumat pelancongan serta acara-acara yang diadakan di seluruh daerah di Sabah termasuk acara di Taman Peringatan Sandakan.
Datuk Speaker, untuk menjawab soalan Yang Berhormat N.50 berkenaan jumlah pelancong yang datang ke Sandakan, kementerian tidak mempunyai data spesifik mengenai dengan jumlah pelancong yang datang ke Sandakan.
Namun, kementerian mempunyai data ketibaan pelancong di Sandakan bagi kawasan pelancongan seperti berikut:-
Taman, pulau-pulau or Turtle Island ketibaan pelancong pada tahun 2022 adalah sebanyak, iaitu 1090 pelancong tempatan dan 3384 pelancong luar negara. Kedua, bagi Pusat Pemulihan Orang Utan Sepilok sebanyak 89 516 pelawat tempatan dan antarabangsa pada tahun 2022 manakala setakat April 2023 adalah sebanyak 35 376 pelawat. Sugud Island Marine Conservation Area, adalah 1446 pelawat pada tahun 2022, 280 pelawat setakat April 2023.
Empat, pelawat ke Santuari Hidupan Liar Kinabatangan 5448 pelawat pada tahun 2022 dan 1328 pelawat setakat April 2023.
Datuk Speaker, berkenaan masalah ganggu monyet di daerah Sandakan dan cara (kurang jelas) konflik wayar untuk makluman dewan yang mulia ini, kementerian saya melalui Wildlife Department (Jabatan Hidupan Liar) telah memasang perangkap monyet bagi mengurangkan populasi monyet dengan memasang dan mewujudkan pasukan pengawalan monyet di kawasan yang terlibat. Jumlah monyet yang telah ditangkap pindah sejak Januari 2022 sehingga April 2023 di daerah Sandakan adalah 57 ekor. Selain daripada ini, kementerian saya melalui Wildlife Department (Jabatan Hidupan Liar) sedang mendraf pelan, we are drafting the plan pengurusan monyet di Sabah untuk tindakan pengurusan populasi yang bermasalah bukan saja untuk daerah Sandakan tetapi untuk seluruh Sabah.
Bagi melaksanakan (kurang jelas) konflik buaya pula tindakan bersepadu menambat buaya untuk mengurangkan populasi buaya bagi kawasan yang mempunyai risiko serangan buaya dan konflik yang tinggi telah dilaksanakan. Papan tanda untuk kawasan yang berisiko tinggi turut dipasang untuk memberikan amaran tentang kehadiran buaya kepada orang awam.
Datuk Speaker, program kesedaran mengenai aktiviti yang tidak digalakkan di kawasan tersebut juga dilaksanakan dengan penduduk yang tinggi berdekatan dengan kawasan yang berisiko dengan cara penyebaran pamphlet dan sesi bertemu pelanggan.
Bagi menjawab soalan Yang Berhormat N.25 Kepayan berhubung proses laporan penilaian kesan alam sekitar EIA bagi perlombongan pasir silika seperti perkara ini telah pun dijawab dalam soalan lisan nombor 21 pada hari ini dan soalan bertulis number 72.
Penutup Datuk Speaker, mungkin terdapat saranan-saranan daripada Ahli-ahli Yang Berhormat di dewan yang mulia ini tidak sempat …
Yang Berhormat Menteri mohon beri laluan kepada Tungku?
No.
Sila duduk Tungku.
Oh, come on.
Tungku jangan...
Let me finish first, okey? I already answered three of your questions. Mungkin, namun saya ingin menjelaskan bahawa sekiranya terdapat isu-isu atau saranan Yang Berhormat semua ingin kemukakan kepada kementerian terutama sekali isu-isu berkaitan dengan pelancongan, kebudayaan dan alam sekitar, pejabat saya akan sentiasa terbuka dan saya mengalu-alukan semua bentangan dan saranan Ahli-ahli Yang Berhormat di dewan yang mulia ini. Datuk Speaker, akhir sekali saya ingin mengambil kesempatan ini untuk mengucapkan Selamat Menyambut Pesta Kaamatan kepada Ahli-ahli Yang Berhormat yang ada di dewan yang mulia ini. Datuk Speaker, dengan ini saya mohon menyokong.
Terima kasih Yang Berhormat Menteri. Menteri dia sudah habis.
(unclear audio)
Persoalan dia tadi dia janji akan jawab soalan-soalan yang kita bangkitkan tapi walaupun saya sedar dan tahu bahawa ini merupakan hak dia tapi dewan yang mulia ini perlu tahu kerana kita berbangkit ke soalan-soalan, minta maaflah pasal kita hanya mempunyai masa yang singkat sektor-sektor yang kita sentuh. We don’t have the time jadi dengan izin, saya minta izin kalau dapat Speaker, a few dari segi tadi itu bukan hanya membabitkan tentang penerbangan untuk pelancong tempatan, pelancong overseas pun. Itu merupakan satu dan kalau kita benarkan charter the aircraft, it will kill domestic airline, persoalan open sky, what is our policy?
Yang Berhormat Senallang ah, dia pun dalam kerajaan untuk mengatasi segala soalan-soalan yang telah diberi, diutarakan dari kepada beliau. Jadi, Yang Berhormat Menteri kalau mau balas balik dalam secara bertulis boleh. Terpulang kepada budi bicara ya.
Yang Berhormat Speaker kita terlalu terbatas Datuk Speaker.
Saya tahu, saya tahu.
Kita diberikan sepuluh minit hingga 15 minit untuk kita berbahas, lepas tu di peringkat penggulungan soalan pun tidak diberikan so kita ada berapa masa saja Speaker.
(Mencelah)
… apa guna, apa guna kita upgrade semua di sini … (overlapping voices)
(Mencelah) kalau dia mau jawab kemudian secara bertuliskah itu terserah dengan dia…
Patut dia terima sahaja soalan…
Jangan tolong duduk, bertenang…
Datuk Speaker, kita bertenang.
Kamu pun bekas menteri.
Kamu pun bekas… kamu pun bekas menteri dulu.
Kita cuma bagi cadangan Datuk Speaker.
Kamu pun bekas menteri dulu. Kamu faham.
Soalan saya berkaitan buaya melibatkan nyawa manusia Datuk Speaker.
Saya tahu. Sila duduk. Saya bercakap.
Dan banyak berlaku di tempat saya.
Saya bercakap bukan wayang. Sila… sila duduk. Tolong.
Tanya soalan tidak boleh.
Tolong. Ini… ini…
Berbahas 15 minit 10 minit diberikan.
Apa guna dewan ini?
Apa guna kami datang di dewan ini Datuk Speaker?
Dewan ini untuk usul bah.
Sekarang saya menjemput Honourable Minister of Industrial Development and Entrepreneurship.
Soalan seolah-olah macam mahu bunuh orang kami ni. (Kurang jelas)...kalau tidak boleh jawab.
Sila duduk.
Jawab secara bertulis.
Sila duduk.
Please. I mean…
Menteri sudah jawab tadi.
Sebab kasi chance saya.
Silakan menteri.
Ada chance saya untuk saya yang tadi ada masa untuk saya…
Sangat-sangat mengecewakan Datuk Speaker. Cantik-cantik sudah di… di… direnovation ini.
Ada chance untuk masa saya bah.
Sekarang sebelum menteri yang start boleh saya cadang atau yang saya tanya soalan.
Sila duduk. Saya… saya sekarang bercakap. Kamu tidak memberikan kehormatan di… di Dewan yang mulia ini. Saya sudah berikan laluan.
Tuan Spe…
Sila duduk.
Tuan Alias bin Sani [Sekong]: Mr Speaker…
Teruskan menteri. Pengulunggan.
Datuk Speaker, kita… kita. Datuk Speaker, kita ni seolah-olah…
Saya faham. Duduk. Sila duduk.
Kita bukan mahu membantai kerajaan, Datuk Speaker. Kita cuma bertanya.
Sila… sila… Tidak ada orang mahu membantai kerajaan. Sila duduk.
Kita cuma mahu bertanya secara polite, secara baik.
Dia… tidak mahu menjawab kamu orang punya… dia akan memberikan aa, bertulis.
Mr Speaker… Mr Speaker, sekejap Mr Speaker.
Kalau tidak mahu jawab Datuk Speaker, tak payah jadi menteri!
Eh…
Tak payah jadi menteri!
Tuan Speaker…
Eh… tarik. Tarik balik.
Jangan cakap begitu. Ndak boleh dalam Dewan yang mulia ini.
Ya. Dewan ini memang mulia Datuk Speaker.
Tuan Speaker…
Kalau semua tidak boleh…
Bukan… ada kamu…
Apa guna.
Dengar. Ada kamu…
Apa guna ada kerajaan. Apa guna ada YB.
Dengar. Ada pernah kamu kena ugut begitu? Waktu kamu menteri.
Bukan ugut Datuk Speaker. Kita cuma menyatakan.
Ada kamu pernah kena ugut? Jawab saya dulu. Jawab saya.
Kita cuma menyatakan apa yang sepatutnya Datuk Speaker.
Ada? Ada? Ada kamu kena ugut dulu begitu? Tidak ada kan? Jadi, duduk.
Soalan pun tidak boleh.
Be fair. Be fair.
Mr Speaker… Mr Speaker… Mr Speaker…
Be fair. Diam, Sekong.
Apalah guna kami duduk di sini Datuk Speaker? Cuma mendengar. Bagus kami duduk di rumah online.
Saya… saya… saya sudah panggil. Terpulang. Saya sudah panggil menteri, teruskan.
Mr Speaker, izinkan Sekong sekejap Mr Speaker.
Nanti… nanti.
Kami mahu cuba bagitahu rakyat Datuk Speaker, rakyat di luar ini dengar. Supaya dorang tidak rasa bila kami duduk di sini, kami diam! Kami tidak tanya soalan!
Mr Speaker, perkara kedua dalam ucapan dasar kerajaan mengharapkan agar DUN Sabah…
Datuk Speaker, rakyat di luar tanya bila masa untuk… Bila kami tanya Datuk Speaker, tidak dibenarkan orang lain tahu di luar…(kurang jelas)… Online ni Datuk Speaker. Rakyat tahu ni di luar Datuk Speaker.
Datuk Speaker, atleast Datuk Speaker berperanan sebagai fasilitator dan berlaku adil kepada semua.
Datuk Speaker Standing Order 25 Peraturan Persidangan yang…
Baca.
Minta izin Datuk Speaker, saya ingat selaku Dewan Yang di-Pertua kalau boleh susun atur bagaimana perbahasan, persoalan, jawapan kena dibimbing untuk membolehkan supaya bukan hanya pihak dewan diurus tadbir dengan secara baik, tapi peranan menteri-menteri. Pasal saya bila kita lihat bidang kuasa juga Datuk Speaker boleh menentukan. Dia ada hak untuk menjawab tidak menjawab tapi kalau kita mendengar rentetan apa yang telah dijelaskan tadi dan kita minta, kita patuh, kita akur. We are a very discipline people. Nanti dia akan jawab, nanti dia akan bagi peluang. Sindumin pun juga bangun tapi tak juga diberi peluang tapi saya ingat kalau boleh kalau dia dah janji, tunaikan janji. It’s not a question of you cannot answer whatever, you can answer secara bertulis ataupun tidak. Tapi perkara ini penting kepada kita untuk menjelaskan kepada umum. Pasal kita tahu, this is viral. Ini rakyat mendengar dengan kita persoalan tentang bagaimana maklumat.
Terima kasih.
Yang mereka dengar, and they need to be on board. Sektor pelancongan, need to be on board on how to ride on the business opportunity that they have. Terima kasih.
Ah, terima kasih Yang..
Yang Berhormat Menteri. Silakan.
Thank you, Datuk Speaker. Good afternoon. Salam Sejahtera, Salam Malaysia Madani, Salam Sabah Maju Jaya, er, a very good evening to everyone of you, da jia hao. Datuk Speaker, allow me to record my appreciation and convey… my thanks for the opportunity given to me to wind up the debate on the motion on the Government Policy Speech delivered by His Excellency the Yang di-Pertua Negeri of Sabah on 22 May 2023. I humbly thank and extend my warmest congratulations to His Excellency the Yang di-Pertua Negeri of Sabah for the delivery of the Government Policy Speech. Datuk Speaker, I will try to summarise, er, speech, er, Policy… Er, I mean the winding-up today, and I will open, er, for questions from colleagues so that we can optimise time in the future.
Datuk Speaker, throughout following the debates by the Honourable Members in this honourable House, I have heard and noted various grievances concerning basic infrastructure and utility needs, especially electricity and water supply, for developing the industrial sector in Sabah. It cannot be denied that, while my ministry is working to develop industry in Sabah, we do acknowledge that, er, the challenges in terms of electricity and water supply are very significant. Therefore, over the past few months, my ministry has held several engagement sessions together with various ministries, including MITI at the federal level and also, er, the relevant ministries… relevant ministries. For us, how… while we strive to develop the industries Sabah needs, we, meanwhile, need to solve and address our infrastructure problem. Datuk Speaker, er, I have informed… informed this honourable House that the investment performance in 2022 was very positive. RM8.38 billion, which we recorded, er, it is seen to have increased, and we, Sabah, a state that ranked fifth in investment inflows, er, last year. This shows the momentum in Sabah, er, in terms of investment inflows in Sabah, and it is expected to continue to increase this year with our efforts to continue creating a good industrial ecosystem for Sabah.
My ministry has cooperated with…
Datuk Dr.
Mr Speaker… Mr Speaker…
… er, the Ministry of Investment, Trade…
Honourable Minister, there is an interjection from YB Sulabayan. Datuk Dr.
May I? Thank you, Mr Speaker. Thank you, Honourable Minister. I am giving my view. Regarding what was said, the Ministry of Tourism, for example, is already in the Policy Speech. What was read by His Excellency. What is more important is that ministers answer questions, that should be given priority. This again repeats what was read in the Policy Speech, so there is no space. The answers given are what we need. Thank you.
Teruskan menteri.
Yes, thank you to the Honourable Sulabayan. I will shorten this introduction later. I will, er, provide answers to what was raised, er, during the debate sessions yesterday and today. My ministry has cooperated with the Ministry of Investment, Trade and Industry Malaysia, namely MITI, so that together we can find suitable measures to continue, er, creating an investment ecosystem and also industrial development in Sabah. So, we have held several sessions, and I would also like to share several sectors that we feel, er, are suitable for us to focus on, namely, first, green technology-based investment. Second, downstream industry investment based on available resources. Third, investment in renewable energy industries. And fourth, investment in low energy intensity industries. So, some of these have also been mentioned in the speech at the question-and-answer session of the Minister of MITI in the Dewan Negara (Senate) last month. Therefore, my ministry will strive
as hard as possible to attract more investment in the energy sector, especially in renewable energy. At present, the water supply used by investors is using the same water supply source as consumers.
Domestic, namely treated water supply, whereas most of these investors' factories only discharge, require clean untreated water. Therefore, on 22 November 2022, the Cabinet approved the proposal to implement a feasibility study on the supply of Industrial Water for clean untreated water, or Non Portable Water, in industrial estates by Syarikat Jetama Sdn Bhd.
This study is being carried out by Jetama and is expected to be completed at the end of this year. If the supply of Industrial Water can be realised, it will to some extent help the situation we face now, namely the insufficiency of water supply not only in the Industrial Estate but throughout Kota Kinabalu. So, we are studying whether we can set up a system to supply Industrial Water without burdening the treated water supply.
Datuk Speaker, my ministry, through the Department of Industrial Development and Research (DIDR) and SEDCO, is indeed committed to entrepreneurship development in Sabah. The Ministry's mission is to promote micro, small and medium entrepreneurs (PNKS) as the main supporting industry and catalyst for the development of the manufacturing industry. Various programmes and initiatives have been planned for implementation this year. One of the initiatives planned is to establish an Entrepreneur and Small Trader Development Council, so that we can coordinate the policy and direction of entrepreneur development. This entrepreneur development will also work together with KUSKOP at the federal level so that we have coordination between the Federal Government and the State Government, so that we can concentrate our focus and resources to help
entrepreneurs and small traders. So, many programmes we know of at the federal level or at the State level, but we must have coordination so that we can ensure these programmes will help entrepreneurs.
So, and also for the information of this honourable House, my ministry, through the Programme (SME OUB) or the Assistance Programme (IKS), this year has been increased to 15 million from 10 million last year. This year 15 million, and we will ensure the channelling of this assistance to entrepreneurs who need it, and we focus on four sectors, namely, firstly, packaging, secondly, machinery, if entrepreneurs need assistance to buy machinery for upskilling, their entrepreneurship, and thirdly, mandatory certification and halal certification, and also digital marketing. So, four.
Datuk Speaker.
Fokus ini.
The Honourable Minister, there is an interjection from the Honourable Senallang, thank you.
Datuk Speaker, thank you. The Honourable Minister has heard what was put forward: the increase in terms of initiatives provided, 15 million so far as stated, and encouraging several IKS entrepreneurs. I want to ask the Honourable Minister, from the data available, how many have received returns, and how many companies have benefited from this, yes.
For the information of the Honourable Senallang, this programme has just opened for applications, and I welcome Honourable Members to obtain information from my officers so that they can submit applications so that we
can try to help more entrepreneurs who need such assistance. So, it is now open and will be screened in mid-June, and we will disburse the allocation to the entrepreneurs who are successful in, what, in receiving, yes. My ministry also cooperates closely with the Ministry of KUSKOP under the leadership of the Honourable Datuk Ewon Benedick to help create more programmes this year for us, as I said earlier, we will create more programmes and also obtain more allocations to help entrepreneurs in Sabah in particular.
So, Datuk Speaker, I am pleased to answer the questions raised by Honourable Members in the two-day debate session. So, for information, to answer the questions from Sulabayan and also Sri Tanjong regarding investment by large foreign investor companies such as Sk Nexilis Sdn Bhd and the Kibing group, and also East New, which we discussed a lot yesterday, the detailed information is as follows. For Sk Nexilis, the copper foil manufacturing plant, the construction status of the factory so far is 75.9% constructed, and it is expected to be completed at the end of this year and is expected to begin test production next month.
The total number of job opportunities created so far is 210 out of 500 estimated, and the percentage of the total jobs obtained by Sabahans is 78%. 78% are Sabahan. For the Kumpulan Kibing, which manufactures solar glass, the investment value is RM2.48 billion. So far, the construction status of the factory is 50%. The total number of job opportunities created is 652 out of 1,800, and the percentage of total jobs obtained by Sabahans so far is 70%. 70% are Sabahan. And for the Pasir Sirikan processing plant in Sikuati, Kudat, the construction status of the factory is 45% so far. The total number of job opportunities created so far is 134 out of 300 estimated. The percentage of total jobs obtained by Sabahans so far is 79%. 79% are Sabahan.
For East Steel, yesterday we discussed East Steel, whether they, and I had given the answer that this East Steel company's investment value
is quite large, RM19.8 billion, and they have stated their commitment to invest in Sipitang SOGIP. So, for the information of Honourable Members, the investor is now preparing the factory and jetty design, the DP development plan and the EIA report for this factory, which is expected to be completed in the fourth quarter of 2026. The total number of job opportunities created so far, this is to show their commitment, they have already taken on 19 people for initial operations in Sipitang. I have held several meetings with them as well, so the commitment is there and challenges must exist, so the percentage of total jobs obtained by Sabahans so far is 63%. This is also, at the same time, to answer Sri Tanjong regarding what percentage of Sabah's children will be taken for in… Datuk Dr.
Okay, the percentage just now is quite good, 70, 63%, Sabahans, so what… Datuk Dr.
...which category, on survey, whether they are labour workers or technical, how is it?
…only 19 people have been taken so far. We have all these public works, which they, to recruit, to appoint consultants and so on. So, of course, er, for this institute, when they start to hire, we will inform the Honourable Member.
Datuk Dr.
Is this necessary? If I look at it just now, 70% of opportunities for Sabah's children, 60%. So, are these 60%, 70%, what is their skill and competency level? Whether only as labour workers, er, that is what we need, because now there is a problem of unemployment, especially among university graduates. That is what we see. These investors, we do not just accept any investor who wants to come, they must also be investors who, in my view, focus on the needs of Sabah, especially job opportunities.
If the investor comes in the form of high takers, for example, that cannot solve the unemployment problem in Sabah. Ah, this is what we need, data like this. Thank you.
Thank you, Honourable Sulabayan. Er, I give an estimate from the company Esteel regarding the job opportunities that will be created, namely 1,752 job opportunities that will be created once it begins operations. So, I am pleased to share what percentage, er, for Sabah's children and also the workers they will take, what percentage, the percentage for the following jobs: Management 5%, Engineers 10%, Technicians 27%, Skilled workers 49% and clerical and marketing 9%. So, that is their estimate. So, once the factory begins construction and also operation, I will inform this honourable House from time to time.
Datuk Speaker, to answer the question to Sri Tanjong, er, regarding the number of vacancies, er, jobs offered to the people of Sabah and the courses or training provided through FDI, Syarikat Esteel. Among the conditions or guidelines for the approval of the manufacturing licence set by MAIDA (Malaysian Investment Development Authority) is the number of full-time workers. Investor companies must consist of at least 80% Malaysian citizens, while 20% are foreign workers or experts.
Following from that, the Sabah government has determined that 80% of the minimum number of full-time workers, of the 80% of companies, must be offered to Sabahans. By rough calculation, a total of 1,100 job opportunities must be filled by Sabahans. That is an estimate as I just gave. My ministry will always encourage, er, investors, investor parties, to provide courses and training as best as possible, which has been well received by investors, especially sending Sabahans who have obtained jobs to investors' factories overseas.
For the information of the Honourable Member, er, Honourable Members, we have sent more than 100 Sabah children to Korea and also China to
receive training courses, and I myself held a farewell dinner with them to give them some encouragement, so that they, and it is hoped they will go to the big factory in Guangzhou, China to learn the existing skills, and return to Sabah. This is what we intend, with these FDI factories, which will carry out this skill transfer, in which perhaps ten years later, they will have obtained advanced, sophisticated skills, and they will play a role in continuing to advance industry in Sabah.
So, for the information of the success of this initiative, so far SK Nexilis has sent a total of 107 Sabahan engineers to South Korea, while the Kibing Group has sent a total of 94 local engineers to China for training.
Datuk Speaker, for information, to answer the Honourable Senallang and the Honourable Members of this honourable House, regarding control over foreign investors in Sabah, a Task Force or Special Committee has been established by my ministry to facilitate and coordinate all domestic and foreign investment proposals and also monitor manufacturing and factory construction until the investor's factory begins operations. Based on the scope of responsibility of this task force, control over foreign investors can certainly be carried out to ensure these investors are bound by the laws in force in Sabah and also Malaysia.
Datuk Speaker, based on the foreign investors I have mentioned earlier, it is observed that these investments have, to some extent, borne fruit, er, especially in the aspect of economic spillover, the economic split-over that has been created. Through these investments, the logistics industry is among the earliest industries to benefit through these investments, where imported goods from investors during the construction of their factories have also been handled by local companies.
This logistics industry is expected to continue growing while these investors' factories are in operation, where an estimated 254 lorries will be used
every day to transport the investors' imported and exported materials, and at the same time will invigorate import and export activities in Sabah. In addition, local companies also benefit from this foreign investment, especially consultancy firms and construction material suppliers. In addition, the economic split-over is also felt by local entrepreneurs in the food and beverage field, to meet, er, the needs of workers during the construction of the investors' factories. Besides that, foreign investments have also created job opportunities during factory construction, namely as follows: three thousand from SK Nexilis, two thousand at KKIP by the Kibing Group, and it is expected that during construction, 10 thousand, er, workers will be involved in the construction of the Esteel factory.
Honourable Minister, Honourable Datuk Speaker. Thank you. Um, regarding the workers in this development, yes, the development of plants or this industry, the industry they establish, are these workers Sabahans or from China? I find that the construction site is not this investment, but the construction site is mostly from China, and does Kibing use the same, or does Korea also use the same?
The question is also related to the announcement of these many investments, is electricity, sorry, our energy able to cope with these investments? I understand, for example, Kibing's face three, they are already, like, using more than three thousand kilowatt-hours, like Sabah's entire usage, can we cope. Thank you.
For the first phase, Honourable Member, we are indeed able to corp at this point of time. For the phase that is to come, the ministry does need new power generators. We need more so that, if not, we would not be able to, we would not be able to corp with the increasing needs. This is only for three companies, for the companies that will come later, we hope ah,
that is why I say ah, we will also strive to attract investors to invest…
Investing in renewable energy. So this is also quite important for us to have a safe energy mix. So and also to answer.
Datuk Speaker, YB Menteri. Fasa 2 you may not be able to coop. Tapi itu big punya fasa 3, is the entire power grade of Sabah dia punya usage. We ready to coop .
Don't mention about phase 3 first. We will strive for the first phase, make sure the first phase we will cope first, and the second phase too.
That third phase, roughly how many years from now? That third phase, how many years from now?
For your information, 10 years.
10 years. In that 10-year period, can we prepare the energy resources they need?
This is a very good question. I will cooperate with the Ministry of Public Works to ensure their aspirations can be met. So, for the record of this esteemed House, we are committed to helping these investments succeed, and I will cooperate with the Ministry of Public Works to ensure their aspirations can be met.
With permission, Datuk Speaker, I would like to ask the Honourable Minister: whenever questions are raised, the answers raised, it seems we are not very clear about the concrete planning that exists. So that is why, this is why sometimes the nation of Malaysia is far behind compared with Vietnam, compared with India, compared with Indonesia.
Regarding basic facilities such as water supply, electricity supply, they have access supply that allows them to attract as many investors as possible. What I worry about is if, from what is explained, it takes time for us to prepare. If, for example, the target of 3000 kilowatts is needed, the whole including Universiti UMS also goes off, you know. Let alone offices, and now we are already blacked out.
Airports, hospitals, I think there must be some kind of concrete planning to ensure. Don't let investors come tomorrow and then it's not sustainable. It will spread news abroad, "don't invest in Malaysia, in Sabah." Because they don't have the capacity. They don't have the capability. The longer we take to apply for investors, if we are not complete with various facilities to attract the investors who come into our country.
If I hear, for example, I hear the speech of this Honourable Member, billions, Datuk Sepaker. But if I hear the speech of TYT, 8.4 billion. So more than 8 billion, and I think whether the information tallies with what TYT says. How many of these projects have been realised. This is very important, but what I want most is the management and administration of basic facilities, yes. Water and electricity, you must have that, whether this plan can be completed first before attracting many investors. Because recently the Korean manager was punched. Not a story about electricity, not a story about water. Even his salary he was not given, yes. Thank you very much.
Thank you, Honourable Senallang. I agree this problem is infrastructure and also needs. Basic needs such as water and electricity are extremely important for us to meet the aspirations of investors, and we also appreciate investors who are willing to come to Sabah to invest. This is an ongoing effort of my ministry for us to, for us to boost Sabah's economy. So, as I mentioned just now, I do not have information regarding infrastructure.
Would you like to give way to the Honourable Tungku?
Honourable Minister, may I suggest that instead of bringing investors who bring high impact to our economic system, in a situation where we face inadequate infrastructure problems, perhaps it would be better for the investment to be in the form of companies that can develop our infrastructure. Can help us in water projects, can help us in electricity projects, or renewable energy whatsoever? Perhaps that should be prioritised compared with what the Honourable Minister said. Thank you.
Thank you, Honourable Tungku. That is indeed one of the priorities and one of the tasks I am striving for, to attract investment not only from the private sector but also to attract investment especially for energy. It is one of the things we can focus our attention on. So thank you, Honourable Tungku, for that suggestion. Datuk Speaker, to answer the question raised by Kepayan and Tanjung Kapor regarding the investment of Syarikat Kumpulan Kibing in Sikuati, Kudat, it covers the construction of a processing plant including the extraction of silica sand as well as a jetty in Sikuati, Kudat. The silica sand extracted and processed in Sikuati, Kudat will be sent to KKIP for the purpose of making solar glass. The process of the Environmental Impact Assessment (EIA) report has indeed been carried out and has involved a comprehensive environmental impact study for the surrounding area involved, including nearby residents. All environmental issues raised by the public have been taken into account in this EIA study. An EIA evaluation committee comprising departments, agencies and NGOs has been set up to evaluate the EIA study.
All implementation of the project to extract and process this silica sand is monitored and regulated through DP and EIA. For your information, this EIA report is dynamic and can be revised according to suitability and needs. My ministry, together with State Government and Federal Government agencies, held an engagement session with local residents on 9 September 2022 at the Kudat District Office to give further explanation regarding the EIA report. This explanation covered mitigation measures for the silica sand extraction activity as well as rehabilitation of the extraction area.
Besides that, I myself visited Sikuati, Kudat on 18 May 2023 recently to hold further discussions with local residents on this matter, and it was also informed that this EIA report is open to the public and can be referred to by local residents at the office of the Department of Environment. My ministry will ensure that we can share information about the contents of this EIA with Honourable Members and also with the people who have complaints and concerns.
My ministry also monitors the performance and progress of these foreign investors to ensure that job opportunities created are prioritised for local residents. So far, 88 job opportunities have been obtained by local residents and the Kudat district.
Datuk Speaker, to answer the question raised by the Honourable Member for Moyog regarding how many investors have left Sabah or stopped their investment in Sabah, so far there is no investor company that has terminated operations and left the state of Sabah. So this is a good thing, and we will continue to strive to work together with them.
Datuk Speaker, in addition, while we have investments coming in, especially at KKIP and SOGIP, my ministry is also responsible for managing one of the industrial parks, which
Which is POIC in Lahad Datu.
So, we also continue efforts to promote investment in the industrial park in Lahad Datu, which is POIC, and it is my pleasure to announce, as we are aware, POIC has received policy approval to establish a free trade zone, namely a Free Trade Zone in the POIC Industrial Park, Lahad Datu. The establishment of this FTZ will involve an area of 3,000 acres, and it will be developed in phases.
To begin with, in phase one, an area of 1,000 acres will be developed first. In the future, the FTZ at POIC Lahad Datu will also meet trade and export demand with its neighbour, especially Kalimantan, which will host Indonesia's new capital, namely Nusantara, as well as other countries in the BIMP-EAGA region, by utilising the main shipping route of the Lombok and Makassar Straits passing through Lahad Datu. Mr Speaker, indeed infrastructure facilities and communication networks are aspects that need to be given emphasis and stress in ensuring the development process can run smoothly. Lack of complete infrastructure will certainly affect the implementation of the development of the FTZ area concerned. In this matter, to ensure the POIC Industrial Park always receives the attention of foreign investors, improvements and upgrading, the main developers must be implemented at a quick pace. We are striving to ensure that this can be achieved.
Honourable Minister, there is an interjection from…
Yes, I will finish this paragraph first, to ensure consistent, stable and adequate basic utilities supply such as water and electricity, as well as fast and more reliable telecommunications. Indeed, the establishment of this FTZ
can play the role of a game changer. So, we must do our best to ensure the ecosystem is there and the infrastructure is there, yes. Datuk Speaker, likewise for SOGIP, Sipitang Oil and Gas Industrial Park, with the projects mentioned earlier, of course it will boost import and export activities in Sabah, and thereby SOGIP will become a hub for heavy industry, the heavy industry. So, we also hope SOGIP will play a big role, with the estau that we will obtain the investment, it will create job opportunities for local people, and we hope Sipitang will also benefit, yes.
Datuk Speaker, yes. Earlier, the Honourable Minister mentioned the FTZ at POIC Lahad Datu, yes. We take the opportunity from the shipping activities that will pass through the, what is this, Gulf, what is this, Lombok and Makassar Strait. Is the Honourable Minister aware that these goods will face the problem of the Federal Government's cabotage policy later? And how does the Honourable Minister intend to resolve this matter so that the effort can become reality? Thank you.
As I informed earlier, we are now at the policy approval stage. The process is not yet complete, so there will be several meetings and engagement sessions held and conducted to overcome problems that will arise, and they will also raise questions to our side. So, we are coordinating matters that will arise, and hopefully at the next sitting we will obtain more information and I will inform this esteemed House. Thank you, Honourable Tungku.
Honourable Darau wishes to interject.
Yes, thank you, Speaker. Honourable Minister, when the Honourable Minister made a visit to China, and according to the Honourable Minister, billions of ringgit worth of investment
will be brought into the State of Sabah. Did the YB Minister state or inform the investors from China regarding the problem of water and electricity in our state? And if we have sufficient water and electricity supply, has it been informed that the electricity and water rates at our place are not investor friendly? Have they been informed regarding this matter? Thank you, YB.
We indeed have close relations with investors. Especially for KKIP, in the case of KKIP, I meet them almost every week or every two weeks. To ensure that concerns or matters that arise can be found and we can implement them for their convenience. I understand and I agree, since they have brought billions of ringgit here, surely we cannot fail to meet their needs.
This is also one of the priorities, and for the information of the Honourable Member from Darau, indeed, for four days I was in China, I met several companies, especially in the energy field. So, I also hope this is my intention, to obtain their investment, not only for the private sector, but Honourable Member, I think Honourable, you're right. It's very important to get them. Also, to look into the opportunity to invest in our energy sector. Yes.
YB Minister, Datuk Speaker. YB Minister, there are. I also comment on what Darau asked. Investors from China who will come, they are also bound in their country, where clean or no coal energy, non-coal energy is a China policy. I'm wondering, if Sabah enters coal and starts coal energy, clean coal energy, whatever brand you call it, will these investors still come to Melay, to Sabah? Because it will affect their standing or their sustainable government goal in China, because it operates on coal energy in Sabah. Thank you.
Two statement. Satu, renewable energy kita perlu tumpukan comfort focused, dan banyak pelabur-pelabur pun berminat dalam renewable energy, khususnya kita
pun melihat potensi yang besar, after you use the renewable energry to produce hydrogen sepertimana Sarawak yang is doing. The other one, now even at once then Semenanjung Malaysia mereka start producing hydrogen melalui renewable energry and clean energy. This is a very good thing, and second thing is that coal, regarding coal I have heard some of the Ahli Yang Berhormat membangkitkan soal coal, belum lagi ada dasar untuk kerajaan untuk coal ini, dan saya, saya alu-alukan perbincangan perbahasan yang berterusan berkenaan perkara ini. I, for me, for me, I focus on renewable energy and investment to it. Thank you.
We both disagree on coal energy. Thank you.
Honourable Minister. I think the Honourable Minister has not answered my question earlier. Did these investors get informed about the shortage we face, water and electrical power, and also the rate, electrical power and water rate? That is my question.
I am sure they all are aware, because they…
They also watching live in this sepanjang sesi dewan ini I don’t I don’t think
Honourable Elopura.
I selalu. I think. I think. Begini. Kita ada sesi untuk berbincang dengan mereka. So we won’t, we won’t, we won’t say that is its not enough because we already committed. Kita sudah berjanji kena kepada mereka kita pastikan akan menjalankan komitmen kita untuk memastikan bekalan itu sampai kepada mereka. Ini adalah tugas kita. We have no way return. We have to do it and we have to commit it. Ini adalah komitmen kita.
Okay. In my question earlier, when the Honourable Minister visited China, not this week, when we are sitting. My question is, when the Honourable Minister visited China, were these investors informed regarding the problem in our state? Thank you.
Yes. We are very honest. We are not. We go everywhere. If investors register their oil to invest in Sabah, we will tell them the latest position. For example, energy capacity, water capacity. We will inform the investors. So, and whether we can commit to the energy and also water that they want to invest here, we will inform them through a special committee, a task force, to ensure all the criteria they require can be found before we can implement the investment. Yes? Emm, yes? Elopura? No. It's okay. It's okay. It won't. We give to Elopura first. Yes. Yes. Continue. Continue. Continue.
Thank you. It means, if because the Honourable Minister says this year, these investors this year also they, um... The problem is, water and electricity, even for our own use we are still unable. Don't tell me there is a special programme for investors who come. What about our people? Yes? Please, Honourable Minister.
Yes. Thank you. So, as I informed earlier, when we discuss the investment potential in Sabah, of course we will look at the plans we have made so far. So I cannot answer on behalf of the Ministry of Public Works, and I think later, when the Ministry of Public Works, we continue this session, it will answer regarding the needs and supply. Ah, (laughter)
Thank you. Thank you. That is what I wanted to know.
(ketawa) Thank you. Elopura?
Thank you, Speaker, for giving me the opportunity.
Thank you, Minister. Minister, thank you, one good minister for us who ask questions, no matter how many there are. Just answer. Good. This is a good example for all the ministers sitting in front here. This is a good minister. Yes, not like the previous one, ah, that one is afraid to answer questions. I waited until the end of this minister's winding-up and still I have not heard, what is happening in the Sandakan area? Developing the industry, lah. That is what I, like, like, there is no question for Sandakan. So, regarding SEDCO. That day, I knew the minister went to SEDCO, right? Visited POIC Sandakan. Although it is not private, this is under SAWIT Kinabalu. Until now I do not see the minister has any way, any programme or any steps to develop Sandakan's POIC or SEDCO in the Sandakan area.
Although I know the Minister also announced, I proposed to the minister, Sandakan should become a field track zone, and now he has proposed to go to Lahad Datu. Okay. This is also no problem. This is for Sabahans too. Okay, this I also keep quiet about. So, I just want to know what steps are being taken to develop industry in Sandakan.
This crane at the port, the crane always breaks down. POIC's heavy phase jetty still has not got its licence. The liquid phase is still stuck over there. There are only three factories. The grass is taller than me. You could raise cows there, maybe they would be healthy. It has been more than 20 years in Sandakan, just like this. Industry just like this. Always blackout. That day I held a press conference saying the compressor always breaks down. Went to claim from SESB, they do not entertain. The food industry has no cargo.
We went to the airport and said we want to rent their space for cargo. There is no more time already because the previous one already wanted to repolish, others cannot enter. If you want, buy it for me.
Honourable Elopura. What do you want to ask?
Yes, don't worry. (crosstalk)
Try.
Yes, he wants to wind up. Many more people are winding up today. (crosstalk)
He is recording. He is recording to know what I want to say.
Ask him. Good enough?
Still got a lot. Still got a lot. I still got a lot.
I have mentioned this once, POIC licensing. When can we get it? That jetty's head. How about developing this airport's warehouse? When will it be added? Before, they said it would be added. Now has it stopped, the project is abandoned already? So there is no space in time for one more flight? Tawau has 1 flight. Cargo, 1 flight. Sandakan does not have any yet. What is the reason? Is it that industry is left behind, or that Sandakan is left behind? Be frank. Tell the people of Sandakan. I do not want to develop Sandakan. I want to go to POIC Lahad Datu, another place. So, the people of Sandakan are satisfied. Do not hope! Hope! Hope! Every day when they meet me, they just hope for that. Be frank. People of Sandakan, I think, enough! Even the salt water is enough. Every industry also not developed. The airport has been built but there is no land for the aircraft to come. Tourism industry, only a few monkeys, just now said. I am also surprised. That is all. Grab Food has no, no results. Grab Food has no results. That Food Court has no results. That is all we, our industry in Sandakan.
Food industry, is it?
Tourism industry, is it. Packaging that… (crosstalk)
Honourable. Honourable. Tourists is already past, the new one is different. Please. Do not keep mentioning tourists.
Even souvenirs have value as an industry too.
No. I am saying that tourism is already past. Now the winding-up is for something else.
Yes, I understand (inaudible)
Please, Honourable Minister. Yes?
This industry, I do not see what the potential is in Sandakan. Add now. Add one PUSPAKOM. Want the trailer or lorry to install GPS. My own lorry. Do I want to guard it myself? I only have one lorry. I want to install GPS to guard myself? What does that mean? I also do not understand what Sabah wants. I also do not know. I went to meet the directive from the top. I also do not know whose directive from the top? The directive from the top. I think this industry's minister hopes can make Sandakan people understand.
Please explain. If you want, let the Sandakan people know, be frank. Let the Sandakan people, and just now they mentioned green energy, renewable energy, want investors to come. What methods? I always mention palm oil in Sandakan, there are 66 units, just now the Minister of Finance mentioned, and the Assistant Minister also mentioned across Sabah there are 120 palm oil mills. I assume Sandakan has 60, 60 oil palm units.
One mill can generate 10 megawatts, so there are 600 megawatts. I cut by half. For example, I cut by half, there are still 300 megawatts for Sandakan. Now we have the means. Why do we want to go to coal, right? Solar? We must know affordability, sustainability, and reliability. If not, then…
Honourable, Honourable Elopura. You, Honourable, keep repeating many times. Yes? Just now during question and answer it was already answered. I ask the Honourable Member to sit down and let the Minister inform. Please sit.
Ini..
Sila duduk!
Last one already. Last one already.
No. Please sit. Right now. Please sit.
(crosstalk)
This energy can be implemented…
Please sit. Honourable Member. Honourable Member! Please sit.
Silakan, Menteri.
Datuk Speaker. Okey. Terima kasih Yang Berhormat Elopura. Ya. Definitely we are not going to abaikan Sandakan. Sandakan a very beautiful town and I will do my best to help Sandakan dan juga untuk POIC Sandakan.
I no longer want to answer because this is under the purview of JKM, and ah, of course it will be answered by the Chief Minister's Department because it is under the management of Sawit Kinabalu. Although I did go there to visit and
I also received a briefing, and we, ah, hope too that the Ministry of Industrial Development can play a role in helping us diversify industry there, because I am sure both of us very know the whole situation there, and ah, Honourable Tanjung Papat also raised questions regarding that place, so, of course we will see how my ministry can play a role to help, ah, there. But, ah, the detailed answer for POIC Sandakan, that Sawit Kinabalu, it will be answered by, ah, another ministry, yes, for this…
Datuk, Datuk Minister.
For this renewable energy biomass. Yes, yes… Datuk...
Thank you, Datuk Speaker.
Ah… give way. Okay.
Okay ah, in terms of what… after listening to what was explained by the Honourable Minister about POIC Sandakan, POIC Lahad Datu. What steps will the government take, learning from KKIP which has been established since 1994. Where this failure to attract is still heard about attracting investors to KKIP 1994. Yes. Most of the KKIP land, people have already bought the land. They become land sellers. Just recently my friend from Peninsular Malaysia, whom I told to come to Sabah. He bought less than 50 million worth of land in KKIP. When I asked why so expensive? He, this… his land. So, I am very worried if we do not learn from areas like this, POIC Sandakan, POIC Lahad Datu, at the level of the conditions that exist in Sabah, they become land sellers. Are there conditions that must be imposed, that within 6 months or 1 year a factory must be set up to ensure development, because this land is left idle. Left there, not developed since 1994 KKIP. Imagine in Sarawak, imagine in Shah Alam, in Penang, you know when there is an industrial park and within 20 years like that, it's already completed. We do not want it to repeat, what steps will the government take to ensure this does not repeat. Yes. To erode. The other two are regarding when I hear all the incentives for foreign investors. What incentives are given to local manufacturers. Yes. Domestic manufacturers, in terms of attracting existing local investment. Thank you very much.
Thank you, Honourable Senallang. Ah, indeed I take note regarding this land that has not been developed after being bought by investors but not developed. We will look at this issue seriously and ensure that these industrial lands can be developed, and we will also target what industries we want, and we will establish a policy, ah, taking into account the Honourable Senallang's proposal, and also for the answer just now, Elopura. For us, the government, my ministry is planning and trying to establish a policy for biomass, ah, because although we know, we know there is energy that can use biomass, its potential is large. So, as the Honourable Member just said, 300 megawatts at least is indeed correct. But now how can we regulate feedstock and how do we negotiate with all these parties who play a role in that field. How can we get all of these in different branches, palm commercial, all biomass, the waste, so that we can collect and for power generation, and also for all of this a policy will be established to look at its potential. So, I also welcome the Honourable Elopura, if possible let us discuss what, ah, good ideas for this biomass matter.
Honourable Minister, how much longer is the winding-up?
I’m i’m almost ah, almost done…
Finish if you can.
Ya… ya i know. I’m so sorry Datuk Speaker.
Not that we still have many, the Ministers who have not finished are waiting.
Then Datuk Speaker, can I say I will end it in 3 minutes, yes… Yes, last one, ah. Last one, ah. Last one, last one. Later I will be scolded by my Minister.
Datuk Speaker, one proposal.
Honourable Moyog, last one.
I go what the YB Senallang has asked.
Apakah insentif kita kepada domestic investor, because we seem to be focus too much on foreign investor. So, going back kepada jawapan Menteri tadi bahawa tiadanya yang tidak proceed ataupun tidak carry on dengan proposed investment mereka. I understand yang sudah invest tiada, belum ada yang keluar. Tetapi pengumuman awal seperti Zeenews, seperti Tan Chong Motor’s all this announcement were big, they were supposed to come in tetapi they face issues terus tidak jadi. So, these are concerns as well. Because they sudah recorded sebagai investment but unrealized investment. Thank you.
For the unrealised investments that have been registered, perhaps through MOUs or the commitments that exist, we will follow up again, and indeed there are some who may come here, sign an MOU, and are no longer interested because of other business conditions. It is not necessarily our problem. They may have a strategy, ah… they may have changed, they may go to Vietnam and other countries. That we respect, no problem. So, for local DDI, local domestic investment, we also very, ah, prioritise it, and MITI and MITe do have incentives for them. So, we will also try to help. The task force is not only focused on coordinating the needs of foreign investors
but also for domestic investors. We will see how we can establish a better system, not only so that we are not seen as if we prioritise foreign investors while domestic investors are not prioritised.
So, this is my ministry's commitment, we will indeed help local investment as well. With this, I thank you for being given the opportunity to take part in this session, and I am so sorry, I took a lot of time, Datuk Speaker, thank you so much. I take this opportunity to once again thank all the Honourable Members, for kindly giving good proposals, good ideas, so that we can discuss how we can develop industry and boost our economy. So, I take this opportunity to wish everyone Kotobian Tadau Kaamatan, and thank you so much. Thank you.
Thank you, Honourable Minister.
Now we invite the Deputy Chief Minister II, Minister of Local Government and Housing. Please, Honourable.
Thank you, Mr Speaker. Greetings of well-being, Malaysia Madani greetings and Sabah Maju Jaya greetings. Datuk Speaker, first of all I express my gratitude to God Almighty because, by His leave and abundant blessings, I have the opportunity to deliver the winding-up speech for my ministry in this August House. I also wish to record my highest appreciation to His Excellency, the Yang di-Pertua Negeri of Sabah, Tun Dr. Datuk Seri Panglima Haji Juhar Haji Mahiruddin, for the policy speech on the occasion of the Opening Ceremony of the Fourth Session of the Sabah State Legislative Assembly, 16th Sitting, on 22 May 2023. Congratulations to the Yang Amat Berhormat Chief Minister on the success in ensuring the achievement and implementation of the Twelfth Malaysia Plan and the Sabah Maju Jaya or SMJ Direction. This is proven when the implementation…
… Various high-impact initiatives under the SMJ development have begun to bear fruit. It is an achievement we should be proud of, given how difficult it is to develop and revive the state's economy after COVID-19.
Datuk Speaker, the announcement by the World Health Organization, or WHO, on 5 May 2023 that COVID-19 is no longer classified as a global health emergency has brought relief to us all. This means COVID-19 is no longer regarded as a global health threat.
Therefore, the recovery and expansion of the world economy need to begin so as to ensure a more prosperous and balanced livelihood.
However, we must always remain cautious and alert to the symptoms of COVID-19. If anyone shows symptoms, immediate steps must be taken to ensure they do not infect others. In the meantime, media statements on COVID-19 developments in this state will continue on a regular basis, namely once a week for now. This is for general information and also as a measure for all of us to remain attentive and always be prepared. As the saying goes, prepare the umbrella before the rain. Datuk Speaker, my ministry is always committed to efforts to strengthen and further consolidate the legislation under the Local Authority (Pihak Berkuasa Tempatan, PBT) and the agencies under KKTP. With the ministry's initiative to empower the service delivery and performance of PBTs and the agencies under KKTP, my ministry has therefore conducted a review of 335 by-laws under the PBTs in collaboration with Perbadanan Aktiviti Malaysia, or MPC. As a result of the review and scrutiny, several by-laws have been amended, among them the Uniform Building By-Laws 2022 (UBBL 2022), which was gazetted on 29 December 2022.
Among the important new amendments to UBBL 2022 is the issuance of the Certificate of Completion and Compliance by professionals, namely Principles of Meeting Person or PSP, to replace the Certificate of Fitness for Occupation or Occupation Certificate (OC) previously issued by the PBTs. The amendment to UBBL 2022 is a positive one because it reduces bureaucratic red tape, in line with the aspirations of the State Government. For early information, the uniform by-laws currently in the process of gazettement are, first, the Uniform Premises Usage Licensing By-Laws for Commercial and Industrial Trades 2022 and the Uniform Food Establishment By-Laws 2022, while several uniform by-laws are at the final stage of preparation, namely, firstly, the Uniform Public Vehicle Parking Provision By-Laws 2022 and the Uniform Earthworks By-Laws 2022. Apart from being a control mechanism, all these by-laws will be able to increase the income of the Local Authorities.
The Sabah Town and Country Planning Ordinance Chapter 141 will also be amended to ensure it meets current requirements in the development planning of the Local Authority (PBT). At the same time, the ministry is also in the final stage of drafting the amendments to be made to the Development, Housing, Control and Licensing Enactment 1978, which will be tabled at the upcoming State Legislative Assembly sitting, as well as in the process of preparing a new draft law, namely the Building Management Enactment, which among other things provides for legislation to regulate Short Term Rental services or short-term rental accommodation. Datuk Speaker, the goal of sustainable development towards a green and liveable environment is the direction to be achieved through the preparation of the KKTP initiative document, towards a low-carbon society based on three main drivers, namely, firstly, promoting sustainable economic growth, secondly, nurturing a mentally educated society towards a quality and prosperous living environment, and thirdly, making cities and human settlements inclusive, safe, resilient and sustainable. In line with this, there are seven initiatives given emphasis, namely Ecology and Environment, Green Environment, Design, Neighbourhood and Transportation, Green Buildings, Well Water and Solid Waste Management, Green Community and Innovation, while the efforts that have been planned and carried out include the Green Empowerment Programme with PBTs, the E-Plant Programme or Sustainable Greening Initiative, Aspirasi Negeri, Beautiful Parks with PBTs, Upgrading or Enhancement of Public Park Facilities, Development of Community Gardens. As of May 2023, the Federal Government. Sorry, skip. The Fifth, the proposed design integrating green building concepts for the Telupid District Council Office.
Datuk Speaker, among the important functions of the Local Authority is to improve the economic capacity of the local community and generate local revenue sources. Among the efforts in this direction is the provision of Public Markets and Other Business Infrastructure. To that end, in 2023 the State Government has channelled a total of RM6.5 million through the D39 Development Programme of the Twelfth Malaysia Plan to seven PBTs for the purpose of establishing and rehabilitating markets and stalls. The PBTs involved are the Beaufort District Council, Pitas, Keningau, Tambunan, Tenom and Beluran.
As of May 2023, the Federal Government has channelled a total of RM6.01 million through the DP1 allocation for the purpose of building and upgrading markets and stalls to ten PBTs involved, namely the Papar, Kota Belud, Kunak, Kuala Penyu, Telupid, Tongod, Nabawan, Beluran, Tambunan and Kinabatangan District Councils.
Datuk Speaker, allow me to answer the questions that …
Statement submitted to my ministry.
As for the issue of solid waste management and the question from the Honourable Member for Silam, regarding the problem of poorly managed rubbish collection in the Lahad Datu district, it is informed that among the causes of the delay is the increase in
new operating areas, which has expanded the service coverage area. For information, in 2021, the total amount of rubbish collected was 4,372.55 tonnes per month. This figure increased to 5,948.22 tonnes per month in 2022. This shows an increase of 1,575.67 tonnes. This amount will increase many times over during the festive seasons. With this increase, the concessionaire takes longer to clean one area and will cause other areas not to be collected according to the set schedule. The concessionaire, so far, does not have sufficient machinery because of the delay in receiving the new rubbish lorries that were ordered earlier.
YB Minister, there is someone, there is the State Assemblyman (ADUN) for Silam.
Thank you, Datuk Minister.
Make way. Please, State Assemblyman for Silam.
Thank you, Datuk Speaker. Indeed, rubbish collection in Lahad Datu, in the town centre, is extremely slow. We cannot say they have no vehicles. Even if they have no vehicles, why do they not take action so that the rubbish is collected according to schedule? If, if the Honourable Member goes to Lahad Datu, the Honourable Member can see where this rubbish is roaming… scattered… So, this concessionaire was given ten years to do, to.. to.. what, to collect this rubbish. They just couldn't care less. Perhaps the management must be firm, monitor them, and if possible terminate their contract, so that a new company that can carry this out can be brought in. Thank you.
Ah, may I answer once, Honourable Minister? One of the reasons the Honourable Minister mentioned earlier is the shortage of vehicles owned by the concessionaire company, and I myself have spoken with staff of the company. They were supposed to receive seven new vehicles, but at present they have only received one
so far. The problem is how the ministry can give the concession work to that company when the company does not have the capacity to carry out those duties? First. Second, the procurement system for the vehicles, what can the Honourable Member's ministry do so that the procurement can be carried out within a short timeframe? Thank you.
Continue, Minister. Continue.
Thank you for those questions. Let me read first then I come back to the question, all right? Otherwise I'll forget, no, I won't forget, I'll have my sequence later.
As an effort to tackle this problem, the concessionaire is currently doubling rubbish collection work time to twice a day while waiting for the new lorries to arrive. Since April, the concessionaire has taken several actions. Among them, renting five 10-tonne dump trucks, providing 2 roll-on roll-off (RORO) bins and 4 units of 3-tonne bins, setting up a special team that moves using a 3-tonne lorry, and also buying a backhoe to help smooth collection and cleaning work. Meanwhile, on the part of the Monitoring Committee, on the part of the City Cleanliness and Beautification Monitoring Committee has been set up for the purpose of monitoring cleanliness throughout the PBT areas. So, in fact, regarding why they were hired without the capacity to, uh, these equipment and lorries. Actually, that one I cannot answer because it has been done before. But for information also, the concessionaire is still waiting and has already obtained those lorries, and hopefully, I said hopefully, we are informed that by August there will be two new lorries and there will be additional ones by December this year. So, we are still hoping.
For information also, the concession period for rubbish collection work in the Lahad Datu District Council is only five years. There are two concessionaire companies involved, namely HanaMega Sdn. Bhd. and Bumi Mega Teknologi
Sdn. Bhd., and if this problem still persists, we will also not hesitate to terminate or not renew their contracts.
When will their contract end, Honourable Minister?
I don’t have the date at this point in time.
Okey.
We will give it through writing, in writing.
Referring to the name of the company you mentioned just now, saya boleh dapat bayangkan kedua-dua buah syarikat ini adalah syarikat yang sama. Do you agree with me?
I have no information on that. All I know is ada dua konsesi yang berlainan dia punya apa ini nama syarikat dia.
Usul, Usul.
So, we will check whether both of them, we'll try and see, perhaps they can solve it better. Okay? As for the issue raised by the Honourable Member for Kapayan regarding the provision of a rubbish disposal site in the Penampang district and also regarding the allocation for NGOs for waste management, this matter is under review by the Penampang District Council.
Datuk Speaker, regarding the issue of the construction of Affordable Housing. In response to the question from the Honourable Member for Silam, the construction of Affordable Housing is subject to the availability of land. I wish to inform the House that so far, LPPB does not have land available in the Silam State Constituency (DUN) for development under the Affordable Housing Project. The ministry welcomes any proposals from the Honourable Member if there are lands considered suitable for that purpose and to submit them to this ministry for further action.
Sorry Minister, there is a motion.
Thank you. Motion.
Honourable Members, there is a motion for adjournment to be moved by YB Minister.
Yes. Motion for adjournment. Datuk Speaker, I beg to propose that, pursuant to Standing Order 2(1)(b) of the Standing Orders of the House, this House shall not be adjourned until all the Honourable Ministers have finished winding up today.
Is there a seconder?
Datuk Speaker, I beg to second.
Honourable Members, the question before the House is that…
This House shall not be adjourned as proposed. Those in favour say aye (Voices of the House: agree), those against say no, the ayes have it. The motion is carried. Minister, please continue.
Thank you, Speaker. As for the People's Housing Programme (PPR), to answer the question from the Honourable Member for Liawan regarding the addition of PPR houses, my ministry, through the Keningau District Council, has submitted an application for a proposal to build PPR houses on a strategic site located along the Keningau-Tenom road, with an area of 46.27 acres, in March 2023. This proposal for PPR housing development will be forwarded to the Ministry of Local Government Development Malaysia (KPKT) under the 2024 Rolling Plan of the Twelfth Malaysia Plan (RMKe-12) for consideration together with all proposals for PPR housing development throughout the state of Sabah. In answer to the Honourable Member's question. Datuk Dr.
Datuk Speaker, excuse me.
Honourable Minister, there is someone from Sulabayan. Datuk Dr.
May I? Thank you, Honourable Minister of Local Government. I wish to draw attention to this policy speech, where the government will, not just planning anymore, that will build affordable houses to be sold at a price of 47 thousand per unit and will be implemented this year, and several places have already been mentioned. However, I want to draw attention, because in the past we, in this Ministry of Local Government, while the current latest PPRT houses are under the Ministry of Rural Development or village development, yesterday we had a meeting with several officers, and there are now already 79 thousand PPRT houses in Sabah. I am very worried about the quality, this 47 thousand, what the house design is like, only it is mentioned here as terrace houses, and most importantly, our people need to own houses, we know this is related to social problems. The problem faced now in Sabah is the problem of squatters, and this squatter problem is mostly local squatters, not those called immigrants, and these squatters are what cause social problems in this Ministry of Local Government, including rubbish, leakage, theft of electricity and water. So, in my view, although it cannot be denied that in Sukau, in Kinabatangan, Melalap, Tenom there are needs, but the major problem now is in the squatter areas that really need these affordable houses in that location. That is what I think the local government also has a strategic plan where houses should be owned. Previously, when we were in this ministry, I once discussed with Datuk Zuraida about the condition of these houses not being geared towards the needs.
Mr Speaker, I have not yet reached the squatter houses, so can you wait? Datuk Dr.
That's fine, I'm just giving my views, not a question.
Alright… Datuk Dr.
Just finish it for sharing. May I?
For low-cost houses, the cost just now was 47 thousand, we all know that in reality no private party will build these low-cost houses, and in Sabah only three that I know will build these, and that cost is actually not, not enough to build a house that is liveable if possible because of a subsidies here and there, that is what we have to do, and the agencies that build houses like this are only three, namely LPPB, PRIMA and what is it, ah, you remember that. That is from two of the federal. Datuk Dr.
No. What I mean, Honourable Minister, I am not arguing, just correcting the situation, because this is the State Government, because I am worried that these 47 thousand will definitely not go up, and in the end become abandoned. Many houses are left neglected.
For our information, Honourable Member for Sulabayan, we will also build SMJ houses, and the cost of these SMJ houses is more than 80 thousand.
Datuk Dr.
That I do not deny.
What I am asking is this, in this general matter. That one I do not deny, this one, 47 thousand. That I do not deny, it is indeed true.
Okey. Will check back on that, i ask my officer to give you in writing untuk ulasan seterusnya. Datuk Dr.
Because we support this policy speech. Thank you.
Okey.
Honourable Minister, may I interject briefly? Regarding these low-cost houses. In the Merotai Kampung Kijang area, LPPB built 100 units of low-cost houses, but when I made a visit, it seemed there was a problem of neglect, until now they have not yet been occupied. I would like to ask the Honourable Minister what the actual problem is, because many residents over there, and some have asked me when they can move in, and some had earlier applied and their names had been listed and
brought to the committee, but until now there has been no call at all, Honourable Minister. Thank you.
Deputy Speaker [Datuk George Anthony Ginibun]; Continue Minister, continue.
Thank you, Honourable Minister. We will give the answer in writing because i don't have the actual report with me at the moment, thank you. This concerns the squatter issue and the question raised by the Nominated State Assemblyman (ADUN) Dr. Aliakbar bin Gulasan on the policy for managing squatter colonies in Sabah.
I wish to inform the House that my ministry, in collaboration with the Sabah State Public Service Department and the Sabah Maju Jaya Direction Secretariat, has set up the Squatter Management Technical Committee.
This is to draft the Sabah State Squatter Action Plan. This collaboration is in line with the human capital and public welfare pillar of the SMJ development plan, which emphasises resolving the squatter problem in the state of Sabah. Through the Sabah Maju Jaya Direction Aspiration approach, the most realistic solution to tackling the squatter issue is for the government to gazette squatter settlements in the state of Sabah on condition that they comply with the settlement specifications and terms set by the State Government.
My ministry also works with the Immigration Department of Malaysia, the Royal Malaysia Police, Local Authorities (PBT), the Land and Survey Department and other agencies involved in managing the squatter colonies in the state of Sabah. As for the question raised by the Honourable ADUN for Sindumin on resolving squatter colonies as floating villages, especially in the Semporna District, my ministry, through the Housing and Urban Development Authority (LPPB), will collaborate with private developers as partners to provide relocation for the squatters at Kampung Air in an orderly manner.
Through this collaboration, LPPB will plan to provide 500 lots, although the rough estimate of squatter residents at Kampung Air so far is 285 families, together with infrastructure facilities on the new site identified by the Semporna District Council, namely the Tinagaian area measuring 4.43 acres.
…Datuk Speaker, regarding the issue raised by the Nominated State Assemblyman Dr. Aliakbar Gulasan, the local authorities have never issued any licence or permit for any gambling activity because it falls outside the jurisdiction of the Ministry. Therefore, for the time being, any information submitted to the ministry or PBT regarding any gambling activity, including online gambling, will be channelled directly to the Royal Malaysia Police and the Malaysian Communications and Multimedia Commission for further action under the Betting Houses Act 1953, Act 289 and the Communications and Multimedia Act 1998. Datuk Speaker, to answer the question of the Nominated State Assemblyman Datuk Amisah Yassin regarding the dengue issue, to reduce dengue fever, the Sandakan Municipal Council has organised gotong-royong programmes, namely cleaning drains and destroying mosquito breeding sites every week in the outbreak areas. At the same time, the Sandakan District Health Office carried out 28 fogging operations, and a total of 28 gotong-royong activities were carried out in the Elopura area throughout 2022, and up to 7 May 2023, a total of 13 gotong-royong activities had been held in the Elopura area, to answer the question of the Honourable Member Liawan…
Honourable Datuk Speaker, Honourable Minister.
The Honourable Minister mentioned the dengue issue just now in the Sandakan area, yes. The dengue problem also occurs in Lahad Datu. But what I want to ask is, in residential areas of the quota area, yes, quota area, housing in urban areas, the drains in front of and behind the owners' houses, whose responsibility is it to clean them? Because what happens in the Lahad Datu area, what I have seen is that the breeding sites are drains clogged by leaves falling from landscape trees planted by the District Council. Who should be responsible for cleaning those drains, instead of the community's gotong-royong there? Thank you.
Teruskan Menteri.
kalau kawasan taman-taman perumahan ataupun di tempat perkadaran usually it’s should be the Pihak Berkuasa Tempatan kalau perumahan-perumahan persendirian it’s should be pemilik-pemilik rumah.
That's meant, Yang Berhormat Menteri kena…
I need to know the exact location of the kawasan itu then you can give it to me dan selepas itu we can tampil siapa yang bertanggungjawab sebenarnya.
Yang Berhormat Menteri boleh l…… with the Lahad Datu District Council for the Taman Aman and Taman Sri Perdana Lahad Datu areas, thank you.
Thank you, we will check.
However, for the information of this august House, if it is dengue, actually it will not breed in murky water. It needs clean water in order to breed, so only fresh rain, whether newly stagnant water, can it breed. This is for further knowledge. Okay, I will continue to answer the question of the Honourable Member Liawan regarding the upgrading of existing halls and markets. The Ministry has submitted a proposal to the Sabah Economic Planning Unit (UPEN) for the construction of a new public market for the Keningau District. The estimated allocation cost for the construction of the new market is a total of Ringgit Malaysia 22 million. The proposed application for allocation was submitted under the mid-term review programme of the 12th Malaysia Plan. This application has also been placed under the priority project status of the Keningau District Council.
In addition, the local authority has submitted an application to the Ministry of Local Government Development Malaysia (KPKT) for the repair and upgrading of the market, totalling Ringgit Malaysia 13 million, while for the hall facilities, the Keningau District Council will apply for allocation from the State and Federal Governments for this purpose.
In answer to the questions of the ADUN for Sungai Manila and the ADUN for Elopura regarding the Sandakan Integrated Bus Terminal, I would like to inform the House that this bus terminal will begin operating after the Certificate of Fitness for Occupation or (OC) is issued. At present, the final works to meet the requirements for the issuance of the OC are being carried out, namely the installation of fire extinguishers or sprinklers. After experiencing various problems, all these obstacles will finally be overcome, and this integrated bus terminal is expected to begin operating on 15 June, next month. To answer the question of the Nominated State Assemblyman Dr. Aliakbar Gulasan regarding the rules for building places of worship on open space, I would like to inform that open space is an area allocated for active or passive recreational purposes, including public spaces or places for recreational activities, picnic areas, public areas, sports, public parks, play courts, fields, pedestrian walkways, public plazas, buffer zones, and natural areas. For open space in residential areas, it is intended for recreational and greening activities. The open space provided in residential areas is 10% of land exceeding one hectare, where it becomes part of the condition for approval of the development plan by the local authority. Therefore, places of worship cannot be built on open space, because the provision of open space is intended solely for recreational and greening activities. In answer to the issue raised by the Honourable Member for Sebatik regarding the establishment of the Kalabakan District Council, it is informed that my Ministry has held discussions with the Tawau Municipal Council and the Kalabakan District Office.
The Ministry finds that the existence of the Kalabakan District Council cannot be realised at this time, as the existing development capacity and revenue are not yet sufficient for the purpose of providing services, and the approving authority for the Kalabakan District remains under the responsibility of the Tawau Municipal Council. The Ministry takes note and will study it more thoroughly before any proposal is submitted to the State Government of Sabah's Ministry of Finance.
For the information of the Honourable Member for Sebatik, the absence of a payment counter in the Kalabakan District also does not affect residents' opportunities to make payments for land cess and others. At present, Kalabakan District residents can make land cess payments through the online payment service, namely MPTPay. This facility was introduced beginning in 2018, and with this facility, residents of the Kalabakan District do not need to come to Tawau town to make payments.
As for the issue of the absence of a rubbish collection service in the Kalabakan District, as informed by the Honourable Member, for the information of the Kalabakan District, it is not included…
...within the service operation area of the Tawau Municipal Council. Accordingly, MPT does not impose a quit rent charge on property owners located in the Kalabakan district. However, MPT is prepared to provide a centralised rubbish dump, rubbish collection services and supply roro-type rubbish bins in the Kalabakan district if the Kalabakan residents are willing to bear the operating costs and expenses involved.
Regarding the proposal of the Honourable Member for Sungai Manila, concerning the construction of a new market near the UMS campus in Sandakan, this matter will be studied and given due consideration. In answer to the question raised by the Honourable Member for Elopura, regarding issues in the Sandakan district, I would like to inform that road maintenance falls under the responsibility of the appointed concessionaire, namely Pembinaan Kekal Mewah. The Sandakan Municipal Council will inform the Pembinaan Kekal Mewah concessionaire to take appropriate action.
As for street lights, the council is always striving to ensure that maintenance of lights can be carried out for state roads and housing areas. As for federal roads, they are under the responsibility of the Public Works Department. Nevertheless, the council always cooperates with all parties in ensuring that the street lights in the Sandakan area function well.
Regarding the issue of stray animals roaming at present, the control of the stray animal issue falls under the Animal Welfare Enactment 2005. The local authorities always strive to control the population of stray animals by carrying out capture based on complaints received and also through routine duties, in compliance with the existing enactment.
On the part of the ministry, discussions have been and are continuously held among all parties directly involved to redefine the scope and field of duty of each agency based on existing sources of authority.
Datuk Speaker, I record my appreciation and thanks to all Honourable Members, who have raised several issues involving my ministry. The proposals and views of the Honourable Members are greatly appreciated, and my ministry will study those proposals and views and take appropriate action. For questions that I did not have time to answer or clarify here..
Datuk Minister, may I?
My ministry will provide written answers to the Honourable Members.
Tanjong Aru.
That flat, I did raise it in my debate. That issue. My house. Thank you, Minister, thank you, Speaker.
I have already raised the issue, the flats, in my debate, and I hope that if the Minister can give a follow-up, what is your current status for the flats, because I want to follow up on the status from before. Because last time we were waiting for that result from that testing, whether it is true or valid that the flat building is no longer safe to live in. Up to today, we have still not seen that result, and I was told the result is already there. Perhaps the Minister can share it, and for information as well, Datuk Minister, now this Kemas Kindergarten in the flats has been ordered to receive that notice to be moved, but on the grounds that the building is also not safe, same reason.
So, that is why we ask for its status, because we must also understand now, the learning is ongoing now. So, it is very difficult for the kindergarten to move now. If they (they) move that school, where will they (they) go? The teachers also don't know where to go. Those children too, the pupils also don't know where to go. So, if possible we ask, if possible, if they want to move, it should be at the end of the year, right. After that, school. The term.
Thank you.
Minister, continue. Continue.
Terima kasih Yang Berhormat Tanjong Aru. We will give in writing, okey?
Menteri?
I’m finishing so no more question.
Just a moment. A little. Just short.
Okay? Thank you.
Thank you, Honourable Minister. I understand that to qualify a person or a family to apply for PPR, PPR housing, the maximum is RM3,000. Does this also take into account how many dependants the applying spouse has? That's all.
Teruskan Menteri.
Thank you from Darau. We will give it in writing later.
Mr Speaker, as I conclude my winding-up speech today, I would like to take this opportunity to extend Selamat Menyambut Hari Kaamatan (Happy Celebrating Kaamatan Day) to all Members of the State Legislative Assembly and to all the people of Sabah who celebrate it. Kaamatan is a major day on which we give thanks for every blessing and mercy we receive. In celebrating this occasion, let us together continue to safeguard the health of the state and our families. With that, Mr Speaker, I respectfully move to support.
Thank you for the winding-up speech just now, Minister. I would like to invite the Deputy Chief Minister III, Ministry of Public Works. Please.
Thank you, Datuk Speaker.
Bismillahirrahmanirrahim.
Assalamualaikum warahmatullahi wabarakatuh, greetings of peace, greetings of Sabah Maju Jaya, greetings of Malaysia Madani.
Datuk Speaker and Honourable Members all, praise be to Allah SWT, by His permission and abundant grace, I have the opportunity to present the winding-up speech for the Sabah Ministry of Public Works in this august House. I respectfully and humbly extend my gratitude to His Excellency the Yang di-Pertua Negeri of Sabah for the government policy speech on the occasion of the opening of the First Meeting of the Fourth Session of the 16th Sabah State Legislative Assembly on 22 May 2023. I take this opportunity to thank the Honourable Members who took part in the debate on the government policy involving the Sabah Ministry of Public Works. All the proposals, views and criticisms of the Honourable Members are greatly appreciated and will be given due attention.
Certainly, that government policy speech emphasises the implementation of the economic redevelopment of the state of Sabah through the Sabah Maju Jaya direction, or the SMJ direction, for the progress of this state. The Sabah Ministry of Public Works supports and is committed to ensuring that the direction outlined in government policy is achieved and meets the objectives set. Datuk Speaker, the role of my ministry is to plan and implement infrastructure development such as the construction of road facilities, bridges, water supply, sewerage services, railway services, ports, jetties, and electricity supply for the welfare of the people. In this heavy role, challenges are mandatory and active, especially when faced with very rapid housing and industrial development, with financial constraints and disrupted planning for various reasons. Nevertheless, amid these challenges, the departments and agencies under the Sabah Ministry of Public Works have succeeded and always remain alert and make every effort within their means to implement several programmes and projects that prioritise the welfare of the people, in ensuring that development in this state is sustainable and continuous. It is very important for the people of Sabah in general, including myself, to be aware of whatever the condition of the infrastructure and utility challenges…
We must assess the situation we face today sincerely and fairly. Taking into account not only what is in front of us now, but also what has happened over the previous period. Therefore, this ministry is alert in identifying and drafting improvements in structure, governance and programme implementation, through collaboration with professionals and stakeholders at both state and national levels. Insya-Allah, the changes that are needed will become a reality in the time to come.
Datuk Speaker, on this occasion I wish to record my highest appreciation and thanks to the Honourable Members for their concern, suggestions and comments for the sake of the progress of the Sabah Ministry of Public Works. All of this is to support the government's efforts to make the Sabah Maju Jaya Direction a success, in order to restore and further strengthen the economy and improve the well-being of the people's lives.
Next, allow me to answer several issues raised by the Honourable Members based on the departments and agencies under the Sabah Ministry of Public Works. Firstly, the Water Department. I wish to thank the Honourable Members from Sindumin, Senallang, Merotai, Bugaya, Kemabong, Tanjung Aru, Kapayan, Kukusan and the other Honourable Members, who were concerned to raise the issue of water supply in the state of Sabah. My ministry, through the Sabah State Water Department, has been entrusted with the matters and planning of treated water supply infrastructure development in the state of Sabah. The Sabah State Water Department also strives to raise the level of service to be efficient, quality and customer-friendly for customer satisfaction, through the implementation of planning and development of the Sabah state water supply for the Twelfth Malaysia Plan, namely through the following main water supply programmes of the state of Sabah:
1.
Programme for Development of State Water Supply under the funding of the State Government; 2.
Immediate Water Supply Programme or Sabah State Water Supply Plan through the Ministry of Natural Resources, Environment and Climate Change (KASA); and 3.
Rural Water Supply Programme of the State of Sabah through the Ministry of Rural and Regional Development (KKDW).
In terms of water sales revenue this year, as of 23 May 2023, the Sabah State Water Department has succeeded in collecting revenue of 108.91 million ringgit, or 36% of the estimated collection revenue targeted until the end of this year, which is 300 million ringgit. Meanwhile, the average Non-Revenue Water (NRW) rate is now at 56.7% as of 23 May 2023. The Water Department targets reducing NRW to 54% by the end of this year. Recently, the issue of water supply in the state of Sabah has often been headline news in the mass media and social media. This ministry has taken note of the very worrying shortage of treated water supply. The critical situation regarding the current water shortage, especially in major towns including Kota Kinabalu, Tawau, Lahad Datu and Sandakan, as well as problems involving the operation and maintenance of the department's assets that frequently disrupt water supply, have forced the ministry to reorganise its planning so that more effective action measures can be implemented to address the increasingly pressing water supply issue.
Among the proposals or programmes to address the problem of treated water supply in Sabah are building, upgrading and rehabilitating water production systems. To increase the capacity of treated water supply production, a total of twenty projects to build, upgrade and rehabilitate water production systems have been given priority, with an estimated total cost of 12 billion ringgit. Projects to reduce the Non-Revenue Water rate. To reduce the Non-Revenue Water (NRW) rate, which causes losses in state revenue collection. Two projects to reduce the Non-Revenue Water rate have been listed, namely the Programme to Reduce Non-Revenue Water Rate and the Smart Meter Installation Programme throughout the state of Sabah.
Next, projects to build and upgrade or and also replace water distribution systems, and to build, upgrade and replace water pumps and power generators. To improve the efficiency of treated water supply, outdated infrastructure needs to be upgraded or replaced. A total of thirteen projects to build, upgrade and replace water distribution systems and to build and replace water pumps and power generators need to be implemented. Next, there is an effort to increase the coverage rate of treated water supply in rural areas. The rural water coverage rate of the state of Sabah is currently at 61%. Therefore, to increase the coverage rate of treated water supply in rural areas, eighteen projects have been listed for implementation.
Projects to improve water quality. Disruptions in raw water quality caused by high turbidity, shallow water levels, saltwater intrusion and ammonia-manganese often cause water treatment plant operations to be halted to avoid disruption to treated water quality, in line with compliance with the National Standard for Drinking Water Quality, due to the burden of treatment processes exceeding the capacity of existing water treatment plants. Therefore, to ensure that the closure of water treatment plants can be minimised and to increase the capacity to address the impact of raw water quality problems. A total of four water quality improvement projects have been listed.
Next, there is the project to build and upgrade the offices of the Sabah State Water Department. To provide more conducive office facilities and bring comfort not only to the staff of the Water Department, but also for the benefit of the public as customers of the Water Department, three projects have been listed. Also, to improve the efficiency of the public service delivery system in the management of treated water supply through digital technology transformation. One project has been planned to develop a monitoring system and management of the water supply network information system.
Yang Berhormat Menteri, ada soalan?
Datuk Speaker. Thank you, Datuk Speaker. Thank you, Honourable Minister,
in your explanation just now, from the beginning I heard how the existing non-revenue collections and also the efforts to upgrade the existing offices, to give the situation, what's the name, in these areas, provide good service. A conducive environment, the offices are air-conditioned, have fans. Good. What steps will the ministry take to ensure that not only the offices, the staff, the experience at the lower level, water can be obtained, not that it cannot be obtained. But if they buy, not from the Water Department. Middlemen. In my debate I mentioned how if you buy in Kota Kinabalu, at Pulau Gaya.
Perhaps they don't know, one ringgit, five ringgit, one gallon, they don't know. What steps, like the ones I have stated, will be taken to address the leakage situation, perhaps related to corruption. Sometimes in certain areas some hotels get it, shops get it, houses don't get it, and I have heard a lot but no investigation has been carried out on this matter. What steps are there to address, not just the environment. But, to address the problem of corruption and leakage of this supply. Water is sufficient, only the problem is that it does not reach the areas that need it. Thank you very much.
Thank you, the Honourable Member for Senallang, for raising this matter.
In the ministry's efforts to tighten the service delivery system at the Sabah State Water Department, we have directed that an internal audit be carried out. We hope that from the results of the internal audit, the efforts to tighten and improve the services of the Water Department can be implemented from time to time.
Honourable Minister. May I have a short intervention. Mr Speaker. Honourable Minister, I am interested in the explanation of the Honourable Minister just now, regarding the many projects that will be implemented and the amounts are in the billions, 12 billion I think, if I am not mistaken. I want to be specific about Merotai…
Tuan Sarifuddin bin Hata [Merotai]:…Merotai has two treatment plants. Merotai Treatment Plant 1, Merotai Treatment Plant 2. There are two plants. So I think new construction may not involve Merotai. But Treatment Plant 1 and Treatment Plant 2 often also face problems. I am also not sure what problems occur. Sometimes when I contact the officers of the Water Department, sometimes they state that the machines are broken and sometimes their reason is, yes, what, high NRW. That is quite normal, these are the two reasons we usually get. Can the Honourable Minister do something decisive so that these problems no longer happen. For example, if NRW is high, perhaps a holding pond can be built. Yes, Merotai is not that big either. The population composition is also quite manageable. The houses are also increasingly many, and as I said earlier, PBB has also built 100 units of houses, and if there is no water, Honourable Minister, it will also be a problem for them over there. There is a school, there is a clinic, many have also opened restaurants. Many have complained to me, it is pitiful. The toilets have no water, cooking also has no water…
Okay Honourable Member, do not make an argument.
No, Honourable Minister. I am stating what problems have occurred…
Just ask what needs to be asked. Do not speak at length.
So, I ask the Honourable Minister, what are the proposals or the plans that truly resolve the problem comprehensively in Merotai, Honourable Minister? Thank you, Honourable Minister.
Okay, thank you, the Honourable Member for Merotai. For the specific problem of the Merotai Water Treatment Plant, I will obtain the answer in writing later.
However, as I have said just now, we are currently in an effort to tighten the system for delivering work at the Sabah Water Department, so that the results will bring about a service, a water supply delivery that no longer causes suffering to the people of this state. Please give some time, because to carry out matters that have been left outstanding for so long cannot be done in the blink of an eye.
Can I go on, Speaker? Yes, Minister, I want to ask, when you just mentioned the steps to be taken, improving the audit, I was asked whether this audit is an internal audit or an independent audit? And I suggest, yes… not only the MACC, but also an internal audit examining in depth the situation so that there will be no protection for any party, because this is something we call essential. Thank you.
To take note of the audit carried out, what is being carried out now is an internal audit. If we are not satisfied or need more information, we will take the relevant action later.
Okay, I will continue.
Refilling of posts, refil… empowerment of human resources.
Filling all the posts required by the Sabah Water Department is very much needed to ensure that the operation of the distribution of treated water by the Water Department is at its best level. By having sufficient staff…
Datuk Speaker.
…enforcement, the high rate of revenue leakage will be indirectly addressed and will be able to increase state revenue. Therefore, an estimated sum of 18.37 billion ringgit is required to enable the Sabah State Water Department to implement the actions and mitigation measures that have been categorised as urgent and need to be implemented according to the schedule requirements of the plan, to ensure treated water supply can be delivered perfectly for the welfare of the people of the state of Sabah.
Datuk Minister, if possible, a little?
Short and brief. Before moving on to issues other than water, I observe that several countries, based on writings from journals since the 80s, many countries have already shifted to inter-basin transfer. What is this concept, water management. I am not sure what the response is from the ministry or the department, whether we can explore this for the long term? I think inter-basin water transfer, Japan has already shifted to that method. America has begun. So perhaps this is a method that can be looked at for long-term planning for Sabah. Thank you.
Honourable Minister..
Yes, that is one of the matters being considered.
Let him answer first.
…therefore we need all research inputs and also to look at the implementation schedule. What is important is what we learn from the experience we are facing now, we need a robust plan, where when we plan to build a reservoir over the required period, we must ensure that the plan can be implemented and built and completed according to schedule. What is happening now, for example, we are experiencing delays in the completion of Telibong 2, Phase ii, which, if it had been completed according to schedule, would give us an additional supply of 80 million litres a day, and also Kogopon 2, in Papar, which was supposed to be completed before 2022 and would provide an additional 40 million litres a day.
However, because of the weaknesses I mentioned yesterday, weaknesses in project management, weaknesses in planning well. If I look at the plans that exist in the Water Department to reach 2030, for water supply up to 50 years, it is good. But what I see is a weakness in implementing it according to the schedule that should have been drawn up, and also when it is implemented, the contractors may either be contractors who do not perform according to schedule, or coordination that causes many things to be stalled, causing delays in the projects being carried out. So this is something we need to shoulder together so that it can be planned according to schedule, according to the available finance, and implemented well, completed within the required period so that we get what we want. Yes. Okay, so that's…
There is a question from Tungku.
Honourable Minister, just now, the Honourable Minister mentioned the matter of staffing. I ask the Honourable Minister to visit and see the Water Plant at Kampung Tanjung Labian, which has been fully completed, has not yet operated until now, and when I asked the District Engineer, the District Water Engineer stated that they do not have an allocation to pay salaries for the staff so that the plant can operate, that is the first. Second, what is the status of the water supply project for Kampung Bakapit, Kampung Tulibas and Kampung Mundas, which in the previous sitting we were told should have begun in March this year? But until now there has been no development. Thank you.
Okay, I take note of that suggestion and, God willing, I will make a visit to Tanjung Labian. Recently, last week, I managed to visit the construction site of the Segama Water Plant that is under construction, which, if asked to the contractor who assured that it can be completed according to schedule. But based on my assessment as a Consulting Engineer, a former Consulting Engineer, I see elements or risks of delay in the construction, and the issue of no workers, no salaries. Yes, this is an issue that is happening, which we are in contact with civil servants to obtain approval. That is why recently we were given approval to add, the Water Department was given approval to add workers for the needs that have been stated just now. As for the next question just now, I will answer in writing later.
Datuk Speaker. May I have the floor. Thank you, Datuk Speaker, for giving me the floor. I see…
…that the Honourable Minister's hard work as Minister of Public Works in trying to overcome the water problem experienced in our state. I would like an explanation from the Honourable Minister, apart from the measures just now, the internal audit carried out, the matters of workers, whether the Honourable Minister's ministry is now also thinking ahead about having our water resources managed by a commission or moving towards privatisation for the future, with the hope that, moving forward, problems such as shortage of workers and perhaps other financial matters may…
The Honourable Member should have joined this debate yesterday…
…water problems, yes, I only ask for an explanation from the Honourable Minister, going forward, whether the Honourable Minister is also thinking about our water matters in the future, that there will be no problems, whether we are moving towards privatisation. Thank you, Datuk Speaker.
The Honourable appointed State Assemblyman (ADUN Dilantik) is one of the matters being looked at and studied, however no final decision has been made at this time. Next, I will touch on Sabah Electricity Sdn. Bhd. The ministry, together with Sabah Electricity…
Mr Speaker, with your permission, before he moves on to the electricity supply matter, I would like to ask about water just now, when I heard what the Honourable Minister explained: the various delays, possibly because the contractors, the implementers, have various problems, officers are transferred here and there, they do not know the policy, the policy keeps changing. I wonder whether the government is taking such firm steps. If we find that these contractors do not fulfil the conditions, when I heard just now, like just now, there is a perception, because as an engineer, yes. That your perception is there, your value is there, this will not work for the period after. Terminate it if there is no change, blacklist, as I did before at the level of Mr Speaker. What is the action? I blacklist and I make sure it does not happen again. Second, the allocation, sometimes the monopoly of these companies, many water concessions, I know, so this will hamper our efforts to speed up in terms of water supply.
Yes, based on the observation I made just now, that is why I call for the contract procedures to be tightened, in the procedures for contracts that have been awarded in our Government projects. There are procedures, but perhaps there are elements of weakness, lack of experience in administering the contract. So, this is what is important now: we need to strengthen the civil servants we have, to ensure that they understand the tasks given, carry them out with full commitment, follow the procedure and follow the contract, yes. Okay, I return to SESB just now, the ministry…
No-no, Sekong first.
Thank you Mr Speaker, thank you YB Minister. I would like to ask, what is the status or the government's effort to supply clean water to the islands in Sekong? Thank you.
Does the Honourable Member want to answer all at once or one by one? Okay, Elopura.
Elopura is the same, Sekong is also in my area. I have brought four bottles of water from yesterday, this one has been filtered, I dare to drink it because all of Sandakan drinks this kind of salty water. The Minister said just now 700, I tested 700, it dropped to 300, I do not know, but this now, whatever I test, this 700 now, I drink it, I also cannot drink, it is salty, really salty. I do not know, one day, two days, it can drop to 300. I do not understand, I also do not believe that in one or two days it can drop to 300, that is how it is.
Okay, I ask this question: when will it drop to 50? 120, which is normal, when? Second, this water question, who is responsible for the problem? Seven months we have been drinking it, there are kidney problems, there are skin problems, there are sensitive-skinned babies. Who is responsible? This is the second question, who is responsible? It cannot be that no outsider is responsible. This is not my problem. Because the operator has problems like an ambulance accident, total loss, this dog-damn problem…
Okay-okay get the point because ulang-ulang you punya soalan…
I hope these two questions can be answered for all of Sandakan's water. This I can give to drink, it is just filtered, you can take it, yes, thank you.
Never mind, you keep that water.
Maybe you took it from some sea, nobody knows.
Okay, to answer the question from the ADUN for Sekong, the question is technical, we will answer in writing. As for the question from the ADUN for Elopura regarding the testing just now, I do not know how your testing was done, but what I receive daily is testing from an accredited laboratory on water from the plant at Segaliud. So, today, the water from yesterday that was sent for testing was tested this morning, and the result is 278.9, compared with yesterday's result which I showed as 289, a drop of 10 mmd. So, I feel positive that the salinity level of the water is decreasing, and we hope that with the weather conditions still favouring the people of Sandakan, we pray for Sandakan that there will be more rain, so that the continuous pumping from Sungai Segaliud to Empangan Betotan can be continued to dilute the chloride. From the health aspect, the chloride content that exists now is safe for use, except that chloride affects the taste of the water. What is important in treating the water supplied to consumers is to ensure that the water is clean from bacteria, clean from chemical elements and substances present.
If YB Elopura has ever gone to Sungai Segaliud, where at present the surrounding area is full of oil palm plantations, and we know they fertilise, fertilise the trees by spraying, what do you call it, chemical substances, pesticides and so on. So, we ensure that not only is the water supplied not salty, but it is also safe for drinking, safe from chemical substances outside the plant's environment. So, I hope that the salinity level of the water can be achieved in the coming period, and for the people of Sandakan, I, as the Minister responsible, will monitor this matter from time to time.
Let the Honourable Minister finish, continue.
Water first, water first, please give time.
Okay, Tanjong Aru. He has stood up twice already.
Thank you Mr Speaker, thank you Minister.
Water, ah, this is not a flats issue.
Water, water, not, not water. Just now, congratulations to the Minister who wants to carry out an internal audit to deliver the system for water valves, which I think is important. This is a very good suggestion, and I would like to propose that when the results of this internal audit are available, if possible, the Minister should also table them in the House, so that we know what the problem actually is with them.
So, I would like to ask for an explanation as well, so, does the Minister agree that the private sector that we are now buying water from, is that water also coming from the Water Department? Or where does that water come from? Because I debated this, I would like to ask for an explanation from the Minister. And lastly, I read a newspaper, perhaps one cannot believe it either, but it has a headline that the federal government wants to initiate taking over the water department in Sabah. I stress here, Minister, do not allow KL to take over the Water Department, when in Sarawak they have already asked to get back health, they even want to get back…
…here in Sabah, we want to ask for it back, not to give it again, yes. Thank you Minister.
Okay, ah, for private water bought where? Please give data. Write a letter to us. I will answer in writing. Ah, if only speaking, not knowing the name, where it was bought, no evidence, I cannot answer.
Okay, regarding the Federal Government taking over water management in Sabah. That is news that is not accurate, because if we look at it, listen to the video speech of the Honourable Prime Minister, the Honourable Prime Minister said that he will help the state of Sabah solve the water problem. Only one media outlet directly made the headline that the Federal Government will take over the management of Sabah's water. Yes. Okay. So, may I continue?
Ah, Honourable Minister, I have one question. One question. Ah, Honourable Minister recently we…
Did you raise this in the debate?
Yes, yes, yes…
Ah?
Ada. Boleh?
Teruskan, teruskan.
Can Speaker, ah, thank you, thank you Speaker, ah, the Honourable Minister, please give way. God willing, God willing. Honourable Minister, recently this issue, water, is very big. We understand, global warming and so on, water shortage, but this issue is very big because I also do not know what the real problem is. Recently, ah, the airport, I do not know what the real issue was that made MAB tweet that aeroplanes coming to Kota Kinabalu must first take on water. I, ah, just want to know the explanation of what, what actually happened to cause that situation.
Yes, we are still investigating this matter, what the actual cause of this happening is. However, for now, the water supply at KKIA is available and sufficient. We have made a police report for an investigation into why the matter that was tweeted happened, whether it is a technical element that remains a mystery, or whether elements beyond our control have occurred. So, I am still waiting for the investigation report from the police. Okay, I can proceed with the SESB. The ministry together with Sabah Electricity Sdn. Bhd. is very concerned about the problems that have occurred regarding electricity supply disruptions, especially the problems that occurred recently. As we are well aware, the hot weather that has hit the state of Sabah since the beginning of the year and continues to increase until today has resulted in a rise in energy load, or power demand, which is increasingly noticeable on the grid. The demand for electricity reached a maximum level of 1,080 megawatts, compared with 1,032 megawatts in August last year.
The hot weather is among the factors causing the increase in energy use in Sabah and the Federal Territory of Labuan. Moreover, several power stations were unable to operate due to the need for maintenance and technical damage that requires time to be repaired. This has resulted in a shortage of generation capacity that can be channelled to the SESB Grid System. High load demand compared with generation capacity during peak hours affects the stability of the SESB Grid System, which is monitored at all times by the Grid System Operator at the despatch centre. Controlled and staged supply rationing is one of SESB's short-term measures to ensure the stability of the SESB Grid System. This measure aims to avoid any undesirable incidents occurring to the SESB Grid System, which would take a longer time to restore if problems occurred.
Senallang, do you want to ask a question?
Emm, ...
Want to ask a question?
Can? Okay ah, after hearing what the Honourable Minister said just now about the weather, the main cause of the supply situation. Is this really a fact? Because if we look at states like Shah Alam, there are many industrial factories, many factories in Penang, industry is nothing to do with weather. It is supply, generation is not enough. In Sabah this is not enough. That is the fact. That is why we must have generators, which is not the solution, it is a temporary solution, yes, with respect, what are the steps to ensure it is not the weather? I think the engineer, when I, when I heard, ah, that is a matter that, yes… it is actually not because of generation. What steps has the State Government taken to ensure that the west coast and east green can be connected, so that when there is a blackout on the west coast, the east coast excess, there can be supply. Thank you.
Yes, ah, actually what the ADUN for Senallang asked just now, I will read out shortly. However, indeed, according to the briefing given to me by SESB last Friday, the average supply is indeed not sufficient. What is available is 1,200, but with a factor of 100 megawatts, they set a ceiling of 1,080 megawatts. Under normal conditions, the demand is around 800 to 900 megawatts, but since the hot weather, demand or electricity use has increased sharply, and perhaps also because many activities have opened up, with homes running industries from home using increased electricity. So, starting from that situation, from the normal 800, 900, it has risen to 2,040, approaching the ceiling they set.
So before, ah, the increase in demand grows even more, which would risk damage to the existing grid system, so load shedding had to be carried out. But the load shedding currently being carried out was originally expected to be restored in July. However, the Honourable Chief Minister has directed that additional mobile gensets be added, so that this load shedding can be reduced if possible, without needing to wait until July. And at the same time…
YB Minister, may I interject briefly?
Thank you. In general, load shedding is an old practice, right? Agreed? Why are we still doing it, with many advertisements, what is this, notices from SESB announcing upgrades, upgrades, ah, cables, this and that and so on. We seem to be stuck in one time zone, a load shedding zone. Now, with the timeframe given by SESB to the, what is this, Energy Commission, they still cannot even sort it out? Why can they not cope, ah, as YB said, the impacts with the heatwave, because of the heatwave more aircond are used, more energy is needed. Why did they not anticipate all this, and many housing, ah, Ministry of Housing, and also commercial residences, commercial industrial developers are being approved without discussion about the energy that will be needed when we approve these development applications. Thank you.
Yes, actually the planning exists. The demand exists to upgrade and add capacity to our electricity. However, there is a delay in the approval, ah, of the granting of the additional megawatts needed. For example, in Kimanis, the addition of 100 megawatts was started at the end of 2021, tendered in 2022. However, the appointment letter was only issued in early May recently. So, imagine the delay from the implementation side. But let me read first until the end, and if there are questions, you can immediately open, ah, where it has already…
Catuan, catuan bekalan secara terkawal dan berperingkat merupakan salah satu langkah jangka masa pendek SESB bagi memastikan kestabilan sistem grid SESB. Langkah-langkah ini bertujuan untuk mengelak sebarang kejadian yang tidak dingini berlaku kepada sistem grid SESB yang akan mengambil masa yang lebih lama untuk dipulihkan sekiranya berlaku masalah. Dalam keadaan semasa, catuan bekalan ini dianggarkan akan berlanjutan sehingga bulan Julai 2023 sekiranya permintaan beban kekal melebihi kapasiti janaan yang tersedia. Sebagai langkah interim, SESB telah memasang sebanyak 11 unit set jana kuasa mudah alih atau mobile genset di lokasi strategik bagi membantu kestabilan sistem grid SESB. SESB juga kini sedang mendapatkan set jana kuasa mudah alih tambahan daripada pembekal-pembekal set jana kuasa di seluruh Malaysia untuk membantu dalam usaha ini.
Sebagai langkah jangka masa panjang, Kementerian Kerja Raya (Ministry of Works) akan meminta Kerajaan Persekutuan menyediakan peruntukan melalui Jawatankuasa Perancangan dan Pelaksanaan Pembekalan Elektrik dan Tariff atau singkatannya JPPPET (Electricity Supply and Tariff Planning and Implementation Committee (JPPPET)), iaitu badan perancangan tertinggi yang meluluskan Pelan Perancangan Penjanaan di Sabah yang dipengerusikan bersama oleh Yang Amat Berhormat Ketua Menteri Sabah dan Yang Berhormat Menteri Sumber Asli Alam Sekitar dan Perubahan Iklim, yang telah meluluskan beberapa projek penjanaan baru untuk menyokong pertumbuhan permintaan eletrik di sabah seperti berikut. Pelaksanaan set jana kuasa sewaan berkapasiti 125 mega watt , yang mana kapasiti boleh ditingkatkan berdasarkan kepada permintaan bekalan elektrik semasa yang dijangka akan beroperasi semula suku kedua 2024. Kedua, pelaksanaan set jana kuasa kitar padu gas berkapasiti 100 mega watt di Kimanis yang dijangka akan beroperasi bermula suku kedua 2026.
Pelaksanaan set jana kuasa gas berkapasiti 100 mega watt yang dijangka akan beroperasi bermula suku kedua 2027. Keempat, pengoperasian sistem hibrid bateri,
bateri energy storage system bermula suku kedua 2027. Pengoperasian stesen jana kuasa hidro elektrik baru (run-of-river) di lembangan Padas dengan jumlah kapasiti sebanyak 170 mega watt pada penghujung 2027. Mula tugas stesen jana kuasa hidroelektrik apa Padas di lembangan Padas dengan jumlah kapasiti sebanyak 180 mega watt pada tahun 2029. Dengan penyiapan serta pengoperasian projek-projek penjanaan di atas, adalah dijangkakan bahawa permintaan elektrik organik dan industri di Sabah dapat dipenuhi.
Bagi menjawab soalan Ahli Yang Berhormat Sindumin, Kerajaan Negeri melalui Energy Commision Of Sabah (ECoS) sedang berkerjasama dengan pihak SESB dan Suruhanjaya Tenaga Malaysia (Energy Commission of Malaysia) selaku badan kuasa kawal selia bekalan elektrik ketika ini, di dalam mempercepatkan pelaksanaan tindakan mitigasi jangka pendek. Di dalam masa yang sama, pihak ECoS juga telah merangka Pelan Pembangunan Penjanaan bagi jangka masa sederhana dan jangka masa panjang, yang akan diputuskan sendiri dan dilaksanakan sejurus selepas Kerajaan Negeri mengambil alih kuasa kawal selia bekalan elektrik pada penghujung tahun ini. Berdasarkan Pelan Pembangunan Penjanaan terkini, penambahan kapasiti penjanaan baharu dalam tempoh jangka sederhana, lima tahun adalah seperti berikut. 2023, rental set kapasiti penjanaan sehingga 200 mega watt, IPP solar, lapan unit, 56 mega watt. 2024, IPP solar satu enam mega watt. FYT 3, 18 mega watt, import dari Sarawak, 30 mega watt. 2025, IPP satu sebuah akan menjana 100 mega watt tambahan. 2026, IPP kedua, sebanyak dua buah, 145 mega watt. 2027, IPP dua, 420 mega watt dan IPP solar, 100 mega watt. Penambahan kapasiti penjanaan tersebut di atas adalah untuk menampung pertumbuhan permintaan beban di Negeri Sabah termasuk keperluan industri yang telah komited. Ia juga mengambil kira keperluan untuk pemberhentian operasi loji-loji yang usang dan yang telah tamat tempoh perjanjian.
Pelan Pembangunan Penjanaan tersebut adalah mengambil kira keperluan jidar simpanan, sebanyak 30% iaitu lebihan kapasiti sebanyak 30% daripada kehendak maksima sistem. Ini adalah bagi memastikan kapasiti penjanaan adalah sentiasa mencukupi, walaupun terdapat pemberhentian sementara set penjana kuasa bagi pembaikpulihan terancang kerosakan mana-mana penjana kuasa serta permintaan beban yang luar biasa.
Sementara menantikan loji-loji IPP baharu yang akan siap bermula tahun 2026, Kerajaan Negeri dan Kerajaan Persekutuan sedang mengusahakan untuk mendapatkan penyewaan set pejana kuasa sehingga 200 mega watt dengan secepat mungkin yang akan mula beroperasi pada tahun ini. Dengan siapnya langkah mitigasi ini maka jidar simpanan ataupun reserve margin akan kembali pulih ke tahap sekitar 30%.
Manakala status projek talian penghantaran 275 kV Southern Link, buat masa ini masih belum diluluskan oleh Kerajaan Persekutuan disebabkan oleh isu kekurangan dana Kerajaan Persekutuan untuk membiayai kos projek sebanyak 1.4 billion ringgit. Untuk ini, Kerajaan Negeri telah mencadangkan agar projek ini dilaksanakan segera dengan menggunakan dana yang telah diperuntukkan untuk projek Trans Gas. Trans-Sabah Gas Pipeline yang tidak dapat diteruskan buat masa ini disebabkan oleh ketiadaan bekalan gas yang mencukupi untuk disalurkan. Cadangan ini masih di dalam pertimbangan Kerajaan Persekutuan dan pihak Kerajaan Negeri akan terus menyusul sehingga ianya terlaksana.
Ini adalah kerana kepentingan talian penghantaran Southern Link bagi memelihara kestabilan grid Sabah, di samping keperluan talian voltan tinggi bagi menyalurkan kuasa besar daripada penjana kuasa-penjana kuasa berskala besar ke seluruh grid Sabah dari tahun 2027 dan ke atas. Selain itu, talian tersebut juga berpotensi untuk menjimatkan kos selari dengan inisiatif perancangan kapasiti penjanaan jangka sederhana dan panjang ke arah kos penjanaan optima dan keupayaan talian bervoltan tinggi ini untuk mengurangkan kehilangan sistem atau teknikal system loss. Menjawab pertanyaan Ahli Yang Berhormat dari Moyog dan serta Dewan yang mulia ini, buat masa ini, pelaksanaan dan pengawal seliaan bekalan elektrik di Sabah adalah masih di bawah bidang kuasa Kerajaan Persekutuan melalui Suruhanjaya Tenaga Malaysia, sehingga ianya diambil alih oleh Kerajaan Negeri yang dijangka pada penghujung tahun ini. Kerajaan Negeri sedang dalam perbincangan dengan Kerajaan Persekutuan agar mempercepatkan segala langkah-langkah untuk mempertingkatkan kapasiti penjanaan sehingga 200 mega watt secara penyewaan set penjanaan, dan peruntukan kewangan untuk membiayai inisiatif-inisiatif yang diperlukan untuk mengatasi situasi kritikal di Negeri Sabah. Bagi menjawab soalan Ahli Yang Berhormat Sungai Manila dan untuk pengetahuan Dewan yang mulia,
untuk makluman, buat masa ini, pelaksanaan dan pengawal seliaan bekalan elektrik di Sabah adalah masih di bawah Sabah sama dengan Moyog.
Suruhanjaya Tenaga Sabah buat masa ini hanya mengawal selia sektor bekalan gas daratan berkuatkuasa pada 10 Januari 2023 dengan pewartaan Enakmen Suruhanjaya Tenaga Negeri Sabah dan Enakmen Bekalan Gas.
Walau bagaimanapun, ECoS telah mengambil bahagian secara aktif ketika ini di dalam menyelesaikan isu semasa bekalan elektrik melalui kerjasama dengan pihak Suruhanjaya Tenaga Malaysia dan Sabah Electricity Sdn. Bhd., bagi memastikan kepentingan dan keperluan pengguna-pengguna di Sabah dipenuhi melalui pelbagai pelan mitigasi jangka pendek dan pelan jangka panjang yang mampan. Untuk makluman, Pelan Pembangunan Penjanaan yang diselaraskan oleh Kerajaan Persekutuan bagi jangka masa pendek di Sabah telah mengenalpasti IPP baharu berasaskan bahan api gas asli dengan kapasiti 100 mega watt di pantai barat Sabah, yang telah selesai menjalani proses bidaan dan dijangka akan siap beroperasi pada 2026. IPP tersebut pada asalnya dijadualkan siap pada tahun 2023 tetapi hanya telah mengalami kelewatan di dalam proses pembidaan, dan kini dijangka siap pada tahun 2026. Di samping itu, lapan buah IPP solar berskala besar dengan kapasiti 56 mega watt dijadualkan untuk siap pada tahun ini manakala.
…dan sebuah lagi dengan kapasiti 6 megavolt akan disiapkan pada tahun 2024. Untuk makluman juga, langkah mitigasi jangka pendek seperti pengoperasian semula IPP Libaran 30 megavolt di Sandakan dan di IPP Serudung 33 megavolt di Tawau yang telah tamat operasi serta penangguhan menamatkan operasi loji jana kuasa diesel sekitar 200 megavolt milik SESB telah juga dilaksanakan sementara menantikan penyiapan loji jana kuasa baharu.
Bagi jangka masa sederhana dan panjang, setelah kuasa kawal selia bekalan elektrik di ambil alih kelak maka Kerajaan Negeri melalui eCOS akan mengambil alih perancangan sepenuhnya bagi pembangunan penjanaan di negeri Sabah dan
berhasrat untuk membangunkan sumber-sumber tenaga boleh baharu seperti hydro, geoterma, biojisim, biogas di samping bahan api transisi bagi menampung keperluan tenaga di negeri Sabah.
Saya beralih kepada Jabatan Kerja Raya (Public Works Department).
Datuk Speaker, excuse me.
Kuamut.
Thank you Datuk Speaker. Honourable Datuk Minister, I was observing just now the solution methods to increase our power generation capacity or electrical energy in Sabah. My suggestion, what is this, my question is because just now I spoke about the proposal to continue the earlier proposals for us to explore new resources such as coal and so on to generate electricity. Because during the SESB briefing the day before yesterday, if I am not mistaken, we are only very dependent on gas at present. What if the gas runs out? Furthermore, as additional information. Sorry Datuk Speaker. Furthermore, in Sarawak, which is rich in gas, it uses only 13% gas. 68% it uses coal. Why? Because it is afraid its gas will run out quickly. Likewise in Peninsular Malaysia. 85% coal is used, gas only 30%. We use gas 86%. Coal, as I said just now, we have 100 million tonnes. We don't use it. Imagine in the future if this gas runs out, or not, let's pray, this does not presume upon God, suddenly the pipe bursts and so on as I said just now. All of Sabah will be in the dark. So, my question is, is it the government's proposal or what is the government's decision? Is the government prepared to re-study the earlier proposals to use coal to generate electricity or how? Thank you Datuk Speaker, thank you Minister.
Various aspects are being studied and the decision will be made by the cabinet later. Okey. Of course we take lessons from what we are experiencing now
and we also share experiences with the state of Sarawak, which got there earlier than us in focusing on the energy resources sector. Okey, I move on to JKR, roads, bridges and so on. Datuk Speaker, the ministry together with the Public Works Department Sabah is always committed to providing infrastructure facilities for the convenience and well-being of the people of the state of Sabah. In answer to the question of the Honourable Member for Sindumin and for the information of this august House, the government through the Public Works Department Sabah will ensure that the Pan Borneo Sabah highway project is completed according to the stipulated schedule. Intervention actions are always taken such as close monitoring and the issuance of reminder letters to package contractors if there is any non-compliance with contract terms.
The government will also facilitate any problems that will cause project delays, such as shortages of construction materials, especially bitumen, and delays in completing utility facilities. Routine maintenance work refers to scheduled maintenance work such as pothole patching, shoulder maintenance, grass cutting, drain cleaning, culvert cleaning and other related work. Grass cutting and drain cleaning work is carried out on a rotational basis as in the concession agreement contract. Please, only pothole patching and shoulder maintenance work be carried out immediately after monitoring by the concessionaire. Categories of maintenance work within the scope of routine maintenance do not include repair and reconstruction of roads due to damage to the road pavement structure. For the information of the Honourable Member for Sebatik, the Serudung, Menggaris, Kalabakan road project has been approved in the Rolling Plan Three of the 12th Malaysia Plan under federal allocation as preliminary work. For preliminary work, survey and design at a cost of RM13 million. As for the physical construction works, the direction will be determined by the Federal Government later. In answer to the question of the Honourable Member for Kukusan, the government is always concerned about the problems of the people. Land acquisition and compensation for structures involved in the alignment of the new Tawau northern road upgrading project have been sent to the Lands and Surveys Department. The current status is that the department is still awaiting feedback from the JTU. A total of 85 lots of land have been processed under Section Three of the Land Acquisition Ordinance Chapter 69 and 102 structures involved within the road reserve.
For the information of the Honourable Member for Kemabong, machinery that is obsolete and not economical to use must be disposed of because the lifespan of the machinery has exceeded 15 years. This process is carried out in phases and applications must be submitted to the Ministry of Finance for disposal approval. However, the JKR is making efforts to purchase new machinery in stages, subject to the approval of the Sabah Ministry of Finance.
In answer to the question of the Honourable Member for Nabawan, there are currently a total of 1,210 bridges across Sabah under the supervision of JKR Sabah. Of this total, 828 are semi-permanent and temporary bridges that need to be upgraded to permanent bridges that are safe and usable at all times. As for the Nabawan district, there are 64 bridges that still need to be upgraded. The government does intend to replace all these bridges with permanent bridges and this will be implemented according to priority, depending on the government's financial capacity. For the information of the Honourable Member for Nabawan, the replacement of these bridges has been listed in the D33 bridge replacement programme funded by the State Government, as well as in the dilapidated and narrow bridge programme funded by the Federal Government, for consideration and approval.
Honourable Minister, may I? Thank you Honourable Minister, I was interested in the Honourable Minister's statement just now ensuring that this Pan Borneo will be carried out according to the stipulated time frame. I would like to ask the Honourable Minister, if according to the information of 24 phases, if I am not mistaken, of those 24 phases how many have been completed, and if these 24 phases are fully completed, what year would that be, Honourable? My second question, regarding the maintenance of the roads mentioned just now, the contractors involved. Sometimes these contractors are slow, Honourable Minister. When we give information to the DA and so on, there is no action yet. Sometimes there is a signboard over there that they put up saying "Kerja-kerja sedang dilaksanakan" (Works in progress), but for months we pass along that road and it still has not been repaired, Honourable Minister.
So, I know perhaps the contractor is responsible for one square metre, correct? But…
…it is also not impossible that the road will continue to be damaged over two square metres, err, damaged. It will certainly start… err, small first, but because the repair is delayed in being carried out… repaired, lorries, rain and so on pass along the road, it will become big. And, certainly, the contractor will ask for a bigger allocation to carry out those projects. So Honourable Minister, please err, look into this matter, perhaps these contractors are also less responsible in this matter. Thank you Honourable.
Yes, thank you to the ADUN for Merotai. Regarding Pan Borneo Sabah, Phase One, there are actually 35 work packages that began in 2017 or 2016. At present, of the 35 packages, only 15 packages have had contracts awarded and have entered the construction phase. Of those 15 packages, two are already completed, namely Package 5 in Papar and also Package 27 at Batu 32, Sandakan. Meanwhile, the two other packages expected to be completed before the end of this year are Package 21, which we call the Lahad Datu Bypass, and also Package 15 from Balung to the Semporna checkpoint. So this means that, of the 15 packages, four are completed or will be completed before the end of this year. Meanwhile, the remaining 11 packages are being actively implemented, and according to reports from the Pan Borneo Sabah team, they are expected to be completed before the end of 2024. However, perhaps in isolated cases, two or three packages may extend into 2025. Nevertheless, I cannot say so, because under the procedures and contract arrangements, they have agreed schedules until extensions of time are granted to the contractors concerned. So, err, there will be new dates that will be announced later.
Meanwhile, there are another 20 packages from Phase One that will be implemented, and we hope they can be carried out before the end of this year and also early next year, namely packages 16 to 20, err, 20, which is the alignment continuing from the Semporna-Balung checkpoint to Lahad Datu. Meanwhile, Package 22 from Lahad Datu to Kinabatangan, and the one that err, is currently under way, is 28, 29 and 30 from Batu 32 to Telupid, and Packages 31 to 35 are the alignment from Telupid to Ranau.
Meanwhile, Packages 9 to 14 from Serusup, Tuaran to Simpang Mengayau have also been documented before and are ready, only awaiting the refinement of the value assessment, the new assessment laboratory, before being given a direction for tender or so on, yes. So, we very much hope that from the budget announcement made by the Honourable Prime Minister on, err, in March, April recently, err, 20 billion, part of the 20 billion for the implementation of Pan Borneo Sabah-Sarawak, will be given more to Sabah to ensure that these 20 packages can be started and implemented well. As for maintenance, perhaps this maintenance work is divided into routine work, periodical work and also emergency work. Perhaps, there is work that the Honourable Member for Merotai meant just now, which may be involved in the matter of obtaining work instructions, yes. So, perhaps there is some delay. If it feels too late, you may contact me directly so that I can issue instructions and conduct further investigation, yes.
Err, excuse me, Speaker. Err, may I?
Minister. Yes, just now there was mention of 27 packages, err, not yet, please mention that 27A, yes, just now, Minister, and seven, the seven roads, I have already sent a letter, dear Minister, err, and the JKR Director also knows this issue, please continue, please explain. Thank you.
One more, Honourable Minister. Much the same. Err, the package from Jambatan Putih to Kalabakan, is it included in the Pan Borneo package? From the bridge, from Tawau town to Kalabakan, Kalabakan town. None, none in the Pan Borneo package.
(Inaudible remarks from Datuk Ir. Shahelmey bin Yahya [Deputy Chief Minister III/Minister of Public Works])
Two, three, none? Or is there really none at all?
(Inaudible remarks from Datuk Ir. Shahelmey bin Yahya [Deputy Chief Minister III/Minister of Public Works])
Phase Three from Kalabakan to Kimanis. But not yet at… err, not yet activated, yes.
Terima kasih.
In reply to the Honourable Member for Elopura, package 27A Libaran-Bypass comprises three additional packages that were proposed under the Pan Borneo Sabah Highway Project.
However, when the implementation concept of the Delivery Partners Project was terminated in 2019, the Federal Government decided not to continue those three packages, these additions, including Package 27A. Even so, the State Government will reapply for those packages to be included in the Pan Borneo Sabah Highway Project. The Sabah Ministry of Public Works is preparing a Cabinet Paper to be tabled at the nearest Cabinet Meeting.
The Government is also very concerned about the issue of dark and dangerous roads, which will affect the safety of road users. This includes the problem of street lights not functioning or becoming hazards on the road due to fallen trees. The Ministry (KKRS) through the Public Works Department constantly monitors this situation along the road routes and promptly takes steps to resolve such incidents as mentioned. This issue is one of the high priorities that will be resolved immediately on site to avoid any risk of accidents to road users. There are several more questions from the Honourable Members that were not able to be
answered orally. However, my ministry will reply in writing later.
Datuk Speaker…
Make sure it is answered, yes.
Ya, dijawab.
Honourable Minister, may I have the floor.
Okey.
Thank you, Datuk Speaker, Honourable Minister. Err, yesterday I raised the problem of roads, especially in the Pan Borneo construction in the Karambunai area, particularly the route from Tebobon to Tuaran Old Road, from UMS to the Indah Permai junction, from the Indah Permai junction to the UiTM junction. It is well known that this area is very, very badly affected by road construction. It not only affects residents in the Karambunai area, but, as I said yesterday, it also involves users from other areas, Tuaran, Kudat, Kota Belud and various others who pass through it. If we look at, err, the construction of this road that is ongoing is rather late. My first question is, when will this road be fully completed? Second, I request the KKR to conduct the most thorough monitoring in this area as I said yesterday, where the contractor failed to provide sufficient warning signs, distance, lig… lighting at night, to the point that accidents occurred. In the statistics I obtained from the Police, from 2021 until early 2023, this involved the deaths of eleven…
Datuk Haji Yakubah Khan [Karambunai]: …one person in an accident in this area. Not including seriously injured, seven people. So I very much ask the KKR to pay attention and conduct frequent monitoring in hot spots like this, especially in the rain, when floods occur and so on. So I ask for attention from the KKR itself. Thank you.
Yes, for the information of the Honourable Member for Karambunai, the ministry has taken note of the concern of the Honourable Member from Karambunai regarding the problems of the Pan Borneo Highway project that is under construction.
For the information of the Honourable Member, the ministry through the Sabah Public Works Department has inspected the road in question. The Sabah Public Works Department has been conducting continuous monitoring of road conditions along the project. To ensure the smoothness and safety of road users, the Sabah Public Works Department will ensure the traffic management plan follows the specifications of Arahan Teknik Jalan 2C-85, subject to audit before approval by the competent authority for implementation purposes. Apart from that, most of the new street lights have already been installed and switched on. However, there have been incidents of street light cable theft in several areas, causing those areas to be in darkness. The Ministry of Public Works also wishes to remind all road users to drive within the permitted speed limit as the area is a construction zone.
Datuk Speaker, I further thank and appreciate the commitment and active participation of the Honourable Members in this debate. As well as their firm support for government policy. All comments, suggestions and constructive criticisms put forward in this debate will be carefully studied for the sake of the well-being of the people as a whole.
I am confident and certain that all Honourable Members in this august House desire or fight for the well-being of the people of Sabah. So let us join hands together to strive to ensure that the well-being of our people can be achieved together. For the scope of work under the Sabah Ministry of Public Works, I practise an open-door policy to receive any comments, suggestions or any appointments required for the purpose of the well-being of the people and the state of Sabah in relation to infrastructure development.
In closing, I would like to take this opportunity to wish everyone a happy Pesta Kaamatan 2023. Kotobian Om Kounsikaan Tadau Tagazo Do Kaamatan. Datuk Speaker, I beg to support.
Thank you, Honourable Minister. Now I invite the Honourable Chief Minister to deliver the winding-up speech. Please, Honourable Member.
Assalammualaikum warahmatullahi wabarakatuh.
Walaikumsalam.
Salam Malaysia Madani and salam Sabah Maju Jaya. Mr Speaker, all praise be to Allah SWT, for by His permission and abundant grace, we are able to be together in this august House to carry out the roles and responsibilities entrusted to us by the people to continue developing the state of Sabah.
On this occasion, I extend my highest appreciation and thanks to the Tuan Yang Terutama Yang di-Pertua Negeri Sabah for delivering the policy speech of the government at the opening of the Fourth Session of the Sixteenth Sabah State Legislative Assembly, on 22 May 2023. I also thank and appreciate the Honourable Members who
raised various issues and suggestions while debating the government's policy speech for 2023.
The issues raised reflect our unity to together make the state of Sabah a developed and prosperous state. The State Government has always taken great interest in the issues raised by the Honourable Members, especially those directly related to the Chief Minister's Department.
With that, allow me to answer some of the issues put forward by the Honourable Members during the debate.
Mr Speaker, I wish to emphasise once again that the Sabah Maju Jaya 1.0 Development Plan, which runs from 2021 until 2025, is a comprehensive development plan formulated and implemented in phases. This development plan belongs to all of us, with the slogan Sabah Maju Jaya taken from the motto in the State Coat of Arms, to instil good values and spirit among the people of Sabah so that they are competitive and advance themselves, thus contributing to the progress of the state of Sabah in line with that motto.
Mr Speaker, I thank the Honourable Member for Tungku for the suggestion to issue a report card or the achievements of the SMJ 1.0 Development Plan. For the information of the Honourable Member for Tungku and this august House, two reports have been issued, namely the annual report on achievements over the two years of the SMJ Development Plan and the report on initiative achievements for 2022 which displays the details of the report card with achievement marks. Both these reports can be accessed through the Sabah Maju Jaya Secretariat portal, smj.sabah.government.my.
In addition, a book has also been published and the SMJ Secretariat will distribute it to all Honourable Members in the near future. Here is an example of the book that has been published. There are two here. The annual report of the Sabah Maju Jaya Direction. So I have asked the Direction Secretariat to
supply it to all State Assembly Members present in this House.
Mr Speaker, the Honourable Member from Senallang raised the issue of mineral mining licences. For information, the State Government has issued prospecting licences to several companies. This is an early stage in identifying whether there are minerals in the licensed area or not. The State Government will only decide on mining activities for those companies if the quantity of minerals discovered is economic to mine.
Mr Speaker, the Honourable Members from Nabawan and Merotai touched on the issue of land applications.
Honourable, there is a question. Honourable... (overlapping voices)
…opened temporarily. Yes?
Thank you, Datuk Speaker. When I question the companies that are prospecting, the activities at state level in Sabah. The matter I raised is, what is the basis that allows these companies to be given prospecting mining, not prospecting activities, when we know and are aware that there may be companies not only in Sabah but also perhaps in Sabah there may be, perhaps they were given, and also in Peninsular Malaysia that have experience in prospecting for existing minerals. What is the basis for the mineral potential that so that they have what do you call it, two areas, namely in Telupid 40 square kilometres and…
In Tongod 400 square kilometres, and this was reported by the Singapore page on 6 March 2023. I want to ask, how many companies have been awarded by the State Government, and of those, I want to know the local companies and also the most important basis, why we give it to outside companies. Thank you very much.
Mr Speaker, to answer the supplementary question from the Member from Senallang. In our efforts to search for and extract mining in the state of Sabah, we have an open policy.
Not only is priority given to local companies, but many local companies do not have experience.
Therefore, we open it up to companies from Peninsular Malaysia and from Sarawak to take part in searching for minerals in Sabah. Although perhaps some we have given, in terms of area and so on. But this does not mean that when minerals or mining are found in that area, we will simply give that area to, what's his name. A limited amount. We have decided in the Sabah Mineral Management Committee meeting, only 1,000 acres. That is also only a start. If approval is given for mining, it is only 200 acres, because there are many matters that must be scrutinised in our efforts to issue these mining licences.
This is only a prospecting licence for them to search for where the areas are. So, the matter of a licence to mine will be decided by the government and must also receive comments from all departments because it involves forest, involves the environment and so on. But, we have opened, what's it called, to companies, if I am not mistaken, more than 30 companies that are interested. So we give. But we do not yet have anything. This is only at the initial stage. We also do not know whether there is mining there and so on. Not yet. This is only the (inaudible) stage, Honourable Member from Senallang.
Thank you, Honourable. With the permission of Datuk Speaker, you have just said it. 30 applications. Of those 30 applications, how many have been approved by your good self, the State Government, to carry out this prospecting, and what are the terms of reference that we have divided from 2023 until 2024 for them to carry out this responsibility.
Yes. More than 30, more than 30. Later, yes, if needed we can give a list of these companies, and we give them to search or this licence is for only two years. If within these two years they get nothing, then it will automatically be cancelled. This is at the initial stage. I would like to inform you, this is only at the initial stage. We also do not yet know whether there is, what's it called, whether there are minerals. But according to the sources we have, Sabah has many mineral deposits. There is gold. There is nickel. But we do not know where. So we give them the opportunity to search, what's it called, for these deposits. Okay.
Honourable, okay. Only that is what I want to know, how many local companies, how many outside companies. Because according to the report I received, for example when minerals, when prospecting for minerals, obtains what, a licence from the State Government. Its share price was 0.42 sen. Immediately after it was announced, the share rose 10.7%. So, we have to scrutinise. We do not want the licence of this kind to be used only for the benefit of those outside. That is why I am asking, whether companies in our country benefit, whether in Sabah or in the Peninsula. This too, their shares are already in play. Thank you very much.
Thank you.
Actually, its share price went up, and all of that is beyond the government's control. So, in share business or trading there are all kinds of ways. So I apologise, the government cannot control that situation. Perhaps its luck is good. Its shares went up, so it profited. Okay, I will continue. Datuk Speaker, the Honourable Members from Nabawan and Merotai raised the issue of land applications for the purpose of Temporary Occupation Licences (TOL).
For the information of this august House, under the Forest Enactment 1968, prospective operators must apply for a TOL to allow logging activities to be carried out on government land. Applications for government land may be made either individually or by group. Companies, corporate bodies or registered associations.
Land applications made by any company that have been processed completely and properly by the Lands and Surveys Department and comply with all legal requirements may be approved by the State Government. However, a Temporary Occupation Licence (TOL) and forest licence will only be issued after all the requirements and conditions of the relevant departments have been complied with, such as approval of the environmental assessment report, Environment Impact Assessment, or payment of land revenue, survey of the area applied for, and others.
The Honourable Member for Kapayan suggested that the issuance of Anak Negeri Land Titles (Geran Tanah Anak Negeri) be expedited. The State Government, through the Lands and Surveys Department, will always strive to further improve the achievement of issuing Anak Negeri Land Titles from time to time. The State Government is confident that through the various initiatives introduced by the Lands and Surveys Department, achievements exceeding the set target will be realised.
Honourable Speaker.
Tuan Speaker.
Honourable Member, there is a question from Tungku.
Ah, boleh.
Honourable Sulaman. May I obtain a complete copy of the approvals of TOL granted, as the Honourable Sulaman stated earlier in written form. Name, area, purpose and so on. Who knows, it may involve my constituency. Thank you.
I hope the Lands and Surveys Department will take action and provide a list of the TOL approvals in question. Whether the Lands and Surveys Department or the Secretary of Natural Resources. Mr Speaker, the Honourable Member for Senallang also touched on the issue of the Yayasan Sabah logging concession. The logging concession in Tawau remains under the management of Yayasan Sabah because the area is a forest reserve and Yayasan Sabah remains the licence holder. After logging is completed, Yayasan Sabah, through its subsidiaries, will develop the land on a joint venture basis for industrial tree plantation and oil palm estates where permitted by the authorities.
Mr Speaker, the Honourable Member for Moyog and Kukusan raised the need for asset declarations among members of the civil service.
Requesting an explanation from Senallang.
Earlier, yes.
Thank you, the Honourable answered the question I raised about the land, and I asked.
…regarding a code section that was given to a company owned by Albert Lim. At that time, I still remember the amount given, and I gave instructions that if I'm not mistaken, either 30,000 or 20,000 hectares of that land be returned to Yayasan Sabah so that it can generate revenue and provide scholarships for our children, because this is one, I did not take everything. I said, i'm not here to kill you as a company but we must share. It must be given back with permission to Yayasan Sabah, the question is whether it still remains or has been returned to…
Yes, er, the Honourable Member for Senallang, for this question, I also need to, what is his name, I need to ask our officers at Yayasan Sabah. I myself do not know his name, emm, I do not know the details, so I will provide the position in writing later.
The Honourable Chief Minister…
Ya.
May I pass. Thank you, Honourable Member. Earlier it was touched upon, regarding er, the granting of toll land to one of our people's representatives. So, here the Honourable Member's doubt, we also do not know, Honourable Member, whether the application made was new or old and has been granted. So this we also get through viral news. On WhatsApp, on social media, so is it that easy for the people to apply for an individual if he is not a people's representative. This is the issue, because people outside ask us. For them to apply for something to be gazetted as a village is so difficult. Yet suddenly, a people's representative gets 320 acres of TOL land so easily. Thank you, Honourable.
Thank you, the Member from Merotai. Later we will, ah, inform the Lands and Surveys Department about this matter. Whichever TOL has been given, whichever is in process, whether the TOL was approved long ago, previously, or recently. Ah, later we will provide the information in writing.
Terima Kasih.
Datuk Seri, excuse me, I would like to give a bit of clarification regarding the land application I made. It is actually a CL and not a TOL, and it is newly a PT and has not yet entered the LUC. There is Section 13 displayed, a notice to the PPST for everyone's information. Not a TOL for logging but a CL. Thank you.
Thank you, Datuk Speaker, I will continue.
Mr Speaker. The Honourable Member from Moyog and Kukusan raised the need for asset declarations among members of the civil service.
Honourable, may I interject briefly. I followed the debate of the Honourable Member from Nabawan yesterday, that the application was for a cooperative, he said. But the cooperative is not yet ready and he applied to use his own name. So, that is rather doubtful. So, it is not that the questions from the people are difficult for us to answer. In our areas too, it is difficult for people who apply for villages to be gazetted and so on. Even mangrove areas, they are willing because there is no other place for them to apply. So, when it is like this, it is as if we are accused of abusing our power.
Thank you, Honourable.
Thank you.
In this matter involving the Member from Nabawan, my side, Datuk Speaker, will investigate this matter and we will take appropriate action. Thank you.
Kawang, the Honourable Member from Kawang.
Datuk Seri, I ask to give an explanation on the question from the Honourable Member for Senallang earlier, regarding the 30,000 hectares of land taken and given to Yayasan Sabah. I would like to explain that the 30,000 hectares of land was actually tendered during the previous government and had already been given to three companies, and the tender carried out during the previous government, for the information of you, Datuk Seri.
And after the new government, we continued, emm, continued, emm, I mean after the tender was carried out and given to certain companies, we continued
joint venture efforts with the three companies that had obtained or been approved for the tender, for the information of YB, the Honourable Datuk Seri, and it is still in the logging process now, and thank you to the Honourable Datuk Seri, because the land given to Yayasan Sabah still remains the property of Yayasan Sabah, but is implemented by a certain Yayasan Sabah which obtained the responsibility through their tender. Thank you.
I recall the Member from Kawang, who is also the Director of Yayasan Sabah, what is his name, providing written information to the Member from Senallang. So that err,…
Honourable, if I may recall, when the Honourable has received information from Yayasan Sabah, I would also like to know the name of the company? About the instruction I gave at the early stage, give to Yayasan Sabah so that the revenue is not known whether Yayasan Sabah implements the tender to ensure their revenue can be returned, possibly they do not have the capacity to carry out the cutting. But, what is important, I want to know, if possible, in writing, forward it to me so that I know, because there was no instruction when I was Chief Minister. Only my instruction was very clear, give to Yayasan Sabah what they do, it must be on. Revenue must be generated from those to Yayasan Sabah.
Okay, er, so for this issue or this problem, I ask the Member from Kawang and also the Director of Yayasan Sabah to later provide written information to the Member from Senallang. No need to answer here.
Honourable Kawang, this is the winding-up session of the Honourable Chief Minister. So I suggest the Honourable Kawang give that information to the Chief Minister so that he can give a written reply to YB Senallang.
I think so.
Ya.
Okay, thank you, Mr Speaker, I will continue. The Honourable Member from Moyog and Kukusan raised the need for asset declarations among members of the civil service. For the information of the Honourable Members, as well as the members of this august House, all public officers consisting of the implementation group, management and professional group, and top management group are required to declare their assets every five years. Meanwhile, public officers holding sensitive posts must declare their assets every two years.
Mr Speaker, the Honourable Appointed State Assemblyman (ADUN Dilantik) Dr. Aliakbar bin Gulasan asked about the progress of the Ummah Development Foundation. For the information of the Honourable Member, MUIS is in the process of establishing the Ummah Development Foundation, to be submitted to the authorities. MUIS is also in the final stages of establishing the MUIS Islamic College, which is linked to the objectives of the establishment of the Foundation to empower education and welfare of the ummah.
Mr Speaker, the Honourable Appointed State Assemblyman (ADUN Dilantik) Datuk Jaffari Waliam proposed that the authorities examine more strictly the entry of foreign NGOs into this state, to prevent incitement of the people, especially involving native customary land issues, to the point where the people hate and become angry with the government.
The State Government is indeed taking seriously the trend of increasingly frequent entry of organisations or NGOs from outside Sabah into this state to incite and lead the people of Sabah…
To stage demonstrations and uncontrolled protests.
The State Government will use the powers given to the government to prevent the entry into the State of Sabah of any organisations or NGOs or individuals from outside Sabah who disrupt, who disturb the harmony and public peace in Sabah.
The Honourable Member for Sindumin touched on various matters to make Kota Kinabalu City an attractive city that draws tourists to Sabah. Issues relating to drains, the condition of old buildings, maintenance, river cleaning and grass cutting. The State Government will take note and take appropriate action on the issues raised.
Regarding the redevelopment of the Sembulan area, namely the Sembulan Urban Renewal Scheme Phase 3. The development proposal for this area has been approved by the State Government to a company, where housing units will be given to the original landowners in the area. Meanwhile, the remainder will be developed for next development purposes. The Honourable Member for Senallang has questioned.
Mohon laluan.
State Government involvement in the upstream oil and gas business.
Datuk Speaker.
Untuk makluman.
Minta laluan.
Yang Berhormat?
Ya.
Thank you for the answer regarding Kota Kinabalu City and the Honourable's promise to upgrade Kota Kinabalu City. If possible, let us make Kota Kinabalu City the most beautiful in Malaysia. We have enough criteria, we have the sea, islands, mountains all around and so on, and I request that four more small towns or townships be upgraded, namely one town in the highlands, we propose Kundasang so that it is like Switzerland or New Zealand, which are beautiful. Another is Sipitang because it is the entry town from Brunei and Sarawak. It's a first impression driving from Brunei and Sarawak, with permission. Then two beautiful coastal towns, namely Kuala Penyu, as there are many tourism products there, and I sympathise with Semporna town, which is poorly managed, and let us also include Senallang, Sulabayan. So that Semporna becomes beautiful and a tourist place with Pulau Sipadan, Ligitan and so on. So, we ask whether it is the local government, the State Government or federal allocation. Thank you, Honourable.
Thank you, the Member from Sindumin. We will take note of all the proposals put forward. God willing. Hopefully.
Pray for good things only.
Yes. Good, your question, proposal. We will take it, serious attention. The Honourable Member for Senallang has questioned the State Government's involvement in the upstream oil and gas business. For the information of this august House, it is important for the State Government of Sabah to take part in the upstream oil and gas business because the upstream industry is the source of life for the oil and gas industry. Without this upstream, there is no midstream or downstream industry in this state. Therefore, by being involved in the upstream oil and gas supply chain, the State Government of Sabah will obtain the following benefits:
1.
Increased economic and financial benefits from the sale of both crude oil and natural gas, which are the value chain resources of the oil and gas industry; 2.
Increased employment opportunities for local Sabahans.
Encouraging more local tenders and contract opportunities by obtaining understanding in upstream business; and 3.
Increased knowledge of Sabahans in oil and gas resources and knowledge of collecting hydrocarbon reserve data of Sabah existing or to come, so that any decisions made related to the oil and gas industry are for the interest of the State of Sabah. That is why the State Government is proceeding with the takeover of 50% shares in the Semarang PAC production sharing contract offered to SMJ Sdn. Bhd. under the commercial cooperation agreement that has been signed together with PETRONAS. As a result, SMJ Sdn. Bhd. will receive a 50% partner in the eligibility for oil and gas production from this partnership.
For downstream petrochemicals, the State Government has already acquired a 25% share in PETRONAS Chemicals Fertilizer Sabah Sdn. Bhd. or SAMUR through SMJ Sdn. Bhd., which is the owner of the ammonia and urea plant located at the Sipitang Oil and Gas Industrial Park (SOGIP), which is a world-class ammonia and urea production facility built to produce 1.9 million metric tonnes of ammonia and urea per year.
Datuk Speaker, with permission.
ya juga.
Dengan izin.
ya
Let him finish.
Just a moment, Datuk ah.
Let me finish this first.
Kasih on saja speaker itu. Kasih on saja.
It is also the single largest ammonia and urea plant component in Southeast Asia and the third largest urea plant in the Asia Pacific. Please.
I raise and also propose, as far as possible, we offshore exploration which is very costly, costing hundreds of millions, even reaching billions, and sometimes, there is no oil, no gas that we obtain. As I raised, what are the government's steps to ensure the benefits are fully obtained, not only in terms of shares. Sometimes when I heard just now, shares here and there, 50%, but the benefit to the people as a whole.
For example, petrol stations. Sabah petrol stations with gas cylinders that can be sold, and as a side effect Sabah children will get downstream jobs. You go downstream rather than upstream. Upstream is very costly. If downstream, the benefit is to children and also the existing traders. This is what I raised about this matter because if that happens, there would be petrol stations in the District of Semporna. Sindumin says there is no organisation. For the information of Sindumin, at the end of this year we have a Five Star Hotel. Not much better than Sipitang.
Terima kasih.
Relax.
Member from Senallang. The proposal for downstream is indeed what we encourage. What we mentioned here, we are involved in upstream such as 50% in the Semarang gas well. We do not need to pay anything at all to PETRONAS. So from the dividends that should be given to the State Government, shares or deductions will be cut from there by 70%. But we still receive 30% dividends every year and from this we will obtain at least 50 to 60 million a year. We do not need to spend even one sen to buy the 50% shares that we obtain, and after 10 years, then full returns will be obtained. There will be no more deductions, so perhaps we will get 1.17 billion ringgit after 10 years. That is upstream.
So, the proposal of the Honourable Member from Senallang to boost downstream economic activities, I think this needs to be encouraged because it benefits local companies, individuals involved in the oil industry such as, what do you call them, drums. The sale of gas drums or petrol stations and so on.
Just, Honourable, I…
…asked about it, we realise it is not only the 60 million that is obtained. For example, we share the gas we have with Petronas. Our gas is processed in Bintulu. We don't benefit, but we have shares. We assume that with the shareholding we get 60 million, 50 million, but the minerals we have, we do not get the full benefit of. So if the oil and gas cylinders we produce were sold by ourselves, we made our own gas cylinders, we built our own petrol stations, this is very different from the shares just now, Honourable Member.
God willing, I think this is a proposal that I feel the State Government should accept, because it can bring greater benefit or profit to the State of Sabah as well as the people or local companies. Therefore, in the CCA Agreement we have with what's-his-name, Petronas, we will get more, what's-its-name, opportunities and also benefits from that agreement.
Okey, Tungku.
Thank you, Datuk Seri Speaker. The Honourable Member for Sulaman, this is a layman's question. I want to ask, perhaps. Have we not made efforts to explore for oil onshore? So that the State Government would have full control over such activities compared with exploration on the continental shelf. Thank you.
Thank you from Tungku. I remember that during the Barisan National Government, there was a proposal presented, informed to the Cabinet by Petronas, to explore onshore. I remember this was ten years ago, but up to now we have not received its report, whether there is gas, whether there is oil, in Kudat, Sandakan, Semporna, right up to Kalabakan. Up to now we have not received a report from Petronas. Just for your information.
(inaudible) Datuk Dr.
Rarely, this is the first time I get to speak with the Honourable Chief Minister. I am not an expert in economics, Honourable Chief Minister, because I always think about the State Government's finances. I am worried about every tabling of what's-it, it is mentioned as annual revenue. I will give an example, in what's-it, the policy speech, he said the annual revenue collection in 2022 recorded nearly seven billion compared with 2021, 5.449 billion. This is revenue collection, and what I ask is, how is the national reserve, eh Sabah, sorry, the State of Sabah. Yes, we have reserves, because Sabah has reserves, but in every tabling of the Budget Policy Speech, this is what is mentioned.
So I am not an expert, I just want to know for certain whether the State of Sabah has reserves. I will give an example, I also discussed with friends in Sarawak. For example, for my understanding. Sarawak has reserves of 31 billion, and then annual revenue of roughly 11 to 15 billion. That means it can make an annual budget of up to 15 billion. So, I want certainty on this because I am not skilled in economic matters. Thank you.
Thank you.
The Honourable Minister of Finance may be able to answer how much government reserve there is...
Thank you.
Actually, this is fine, this one I think the Honourable Member must know because you were once part of the government. We do have reserves, but we didn't tell people our reserve for a simple reason. Sometimes some are announced, sometimes some are not, but it changes. It's not static, it depends on how we use our money, but I can tell you the last time I knew, we had 5 billion, no, the reserve that is not used. We have expenditure, we have savings. So what we do not utilise, we still have five billion. We, we Sabahans are humble, modest. We do not want to tell people we have money.
Datuk Speaker boleh? Datuk? Am the reserve about five billionlahkan? I’m just wondering, sudah dua tahun collection for SST. What happen to that’s money? Is it spend or not spend? Or does it become a reserve?
Currently the account is five billion, later what's-it, cash…
Cash but collection SST based on…
Collection SST, which SST? You mean apa itu …
… Collection of all the sales tax…
All of that, the total of our revenue, is seven billion.
…tujuh billion? So that’s mean, it is utilizelah because you have…
Some are utilize and some are already there ... as a reserved … tapi kita punya annual as it was 6.94 billion.
So, with that reserve are you gonna eventually create a (kurang jelas) fund?
We will do the best way to make sure that at least we are not a state that people say, once the money is gone, they panic immediately. We want to, because that is one of the priorities now at the Ministry of Finance, we would like to believe that we are spending money very prudently, that is what I want to say, because in complete sincerity, after I do the job, if I can leave you with a lot of very healthy reserves, then I feel I have carried out my responsibilities well.
But we must remember that spending in Sabah is high. Just to maintain the civil service is nearly 700, over 700 million ringgit per year. Emoluments alone, so it is high. So, if I may conclude, revenue is high but our expenditure is also high, and that is why we must spend prudently.
Datuk Speaker, what the Honourable Minister of Finance has explained, I too was once Minister of Finance and managed 5.4 billion, until perhaps in the record of 2019, but that is not the total reserve that you can put as a fixed deposit, because salaries have to be collected and I also placed a sinking fund in DSTP
almost 1 billion. That is what we say, but when we talk about a special kind of where you put it, you don't have to spend money there, it's different. Only I want to ask, is there already five billion in cash, because before, when I was at the Ministry of Finance, we had to spend a lot, at the time of COVID. One million given to the Ministry of Education, one million given to the fire and rescue department (Bomba), one million given to various agencies, including the Malaysian Maritime Enforcement Agency (APMM), one billion we spent to pay the debts of the former Barisan National Government, one billion one, almost a hundred plus million in interest to the seven banks there. Only I want to ask, is there already such a thing? That is what I said, sometimes these matters are important, overcoming priority problems. I want, no, no, very prudent in the management of finances, but in the meantime the priorities down there, the people, their water, their roads, sometimes there was no time to ask earlier. These are the priorities, especially in (inaudible), water is an important matter. If I think there is a bit of a surplus, if at that time we were able to pay the debt of one billion, we could, pay what's this, give it to the agencies of the Federal Government. Even though it was COVID, six million, I spent more than how many billion for, no, more than 200 thousand people of Sabah in Peninsular Malaysia, the water problem, a main matter that needs defending. If there is a little finance, I think we immediately expedite it so that it can be resolved, not only for investors but for the people who need it. Thank you very much.
I will continue.
We take note, what's the proposal called, if we have finances as mentioned, our reserve is more than 5 billion now, and God willing, the state's main needs, especially, ah, replacing, what's-its-name, the water generator machines, I have informed the Minister of Public Works (Kementerian Kerja Raya) that we will use it to solve the problems faced by the people of this state. So that is perhaps, what's-it, the current financial position, eh, of the state. So, I will continue, Datuk Speaker. The State Government of Sabah will also continue to take over more in the future so that the State of Sabah's involvement in the oil and gas industry can be expanded further,
so that more revenue and participation can be achieved for the State of Sabah as already stated in...
The provisions in the CCA. Regarding the sales tax on petroleum products raised by the Honourable Member from Merotai, we have achieved one accomplishment after another in the oil and gas industry. The state sales tax collection on petroleum products has contributed a total of RM4.21 billion to state revenue since its implementation until now. Therefore, the State Government has no plan to stop the implementation of the state sales tax on petroleum products. Revenue from the oil and gas industry is able to multiply state income, so that it can increase further, become stronger and sustainable, which will certainly be enjoyed by all levels of the people of this state. It cannot be denied that the drastic increase in revenue over the last two years is truly a very proud achievement. Even in such a situation of strong revenue, it is not… it is not a reason for us to feel comfortable and sit back with that achievement. Among the main challenges we must face is how to maintain the state's revenue sources so that the state's development agenda can continue in line with the aspirations of the SMJ Development Plan.
In this regard, I would like to remind once again all ministries, departments, agencies and state revenue collectors to multiply efforts towards higher revenue collection, while continuing to explore new revenues. We are well aware that even in this economic situation which is increasingly recovering, we still face various complaints as raised throughout this sitting of the State Legislative Assembly. Therefore, I would like to urge once again all relevant ministries, departments and agencies to continue working hard and to take more proactive and prudent steps to resolve them so that the comfort and well-being of the people are assured.
For the information of this august House, the State Government will set up a trust fund to ensure that the Sabah state allocation approved in the National Budget is channelled directly into this trust fund, if the channelling of the allocation is agreed to by the Federal Government. With… with the establishment of this trust fund, the State Government can control and make full use of… make full use of the allocation and monitor the physical and financial work for all state development projects.
Mr Speaker, before concluding this winding-up speech, I once again thank the Honourable Members who have raised questions.
Honourable Member, may I ask for a way through?
Yes. Yes. Yes, you may.
I would like to ask for clarification from the Honourable Chief Minister regarding the notice to vacate SFI. Where residents at SFI, Sipitang, have been given a period of about one month to vacate their premises. My question is whether there are any plans from the State Government to help these people, what's-it, in terms of humanitarian aspects? Where will they be placed after this? Because we know that at SFI there are not only people from Sipitang but also from other places across Sabah. I respectfully request that, if possible, we give assistance to them, because they are all citizens of Sabah and human beings too. Thank you.
For the information of the Member for Darau, in fact we have already helped the SFI workers many times, at a cost I think of millions of ringgit. Paying electricity, paying water and so on, but these workers are the responsibility of the SFI company, not the government, this we must understand. And we have informed the workers to look for alternatives until SFI is really developed. Perhaps they will be employed by the company that has been given a concession by the government. But
up to today it has not yet started. So, however, the latest is that we have also helped pay electricity and so on. We are concerned about their welfare. It is not that we are not concerned, but if every day, all the time, we have to be told to pay. I think they must also look for other ways to continue their lives, yes.
Dee.. with permission, regarding the issue raised about SFI, my experience there is that, as we know, at that time it was still under the bank, yes. It was sold to India first. Sold to China first. At that time, I negotiated with an investor from China, Shen Zhen. They stated whether this would be followed up by the State Government or not. They agreed to give 30 percent without payment of a single sen to the State Government of Sabah, and 70 percent would be owned by this company, which would produce paper, not newspaper. Tissue paper, when I obtained it in China, demand is accelerating, he said. There's no ample supply. Only I want to ask, at that time, even a trader, Tan Sri Syed Mokhtar, I rejected him… he also took action on this matter. Because I stated that it's time the state government could take back our rights. Convert that, how we use it, because of the golden share we have. Regarding timber logs, timber in the Sipitang area, SFI cannot be taken by any party without approval, this is the State Government's existing law. And I used that power to enable us to say no, yes. What we did, because of the failure of the plans over several years by the company operated by that Tan Sri, I stated that the State Government has the right.
Even though he took it to court, and he… and he… this matter, we actually have a basis in terms of its legality. What about the State Government, do not let them, because these are our people. At that time, we were paying salaries monthly, yes. For the plan, because it allows, perhaps if the Honourable Member wants to know the company, I don't know, perhaps I can search, can help, because this is a treasure owned by Sabah. We must take back, not 100 percent, the 30 percent that we have. Thank you very much.
Thank you, Member from Senallang. But when we took over the government, we did not, what's-it… meet the company in question. That is why we decided to, what's-it, give the concession to the company of Tan Sri Mokhtar Al-Bukhary, but up to now it has still not started. We gave it time until, I don't know when, but we gave it two years. If it does not proceed, we will cancel that agreement.
Honourable Member, that company was indeed part of my visit to Shen Zhen, perhaps it is in the record. At that time, Hashim, the State Secretary, Hashim Paijan, I brought him, and we made the visit and there is a record, and discussions we conducted on how this investment can be made beneficial. It's ready, the market is there from China, there is not enough supply.
Okay, we will see how.
Yang Berhormat.
For your information, even though I have said so just now, we will still look for ways, on humanitarian grounds, to help our affected people who no longer have jobs at SFI, okay?
Excuse me, Honourable Member.
Honourable Member, may I? Just a little. I.
Sindumin.
Tanjong Aru first, then Sindumin.
Thank you, Honourable Member. Thank you, Speaker. Only regarding TAED.
Honourable Member, because I debated about TAED, so I want to ask what is the status of TAED now, because what we see now, if we visit TAED, Tanjung Aru Beach, Pantai Tanjung Aru, when we visit Pantai Tanjung Aru Beach now there are many restrictions already, it seems no longer like a public beach for our public, there are many obstacles, there are many restrictions. So a lot of the public are asking, what is the status of TAED now. I want to ask so that the Honourable Member can explain, and also if possible I ask that the beach be reopened for the public to use, yes, because there are many restrictions, if you don't believe it, perhaps Datuk Speaker or the Minister can send anyone, but not the Minister, don't go yourself, because if he sees you, there is no problem at all, but if you send the public or anyone to the beach there, you will see, there are many obstacles, many restrictions, many cannot use it, all that. So I ask, if possible, from the Chief Minister, to direct TAED to open up that beach so that the public can use it, after all it is a public beach, we want it. So, this is our stance, we do not want to reject development, no, but we must ensure that even if there is development, the land use remains open space for our public, that's all, thank you.
Thank you. We will convey the proposal from the Member of the State Legislative Assembly for Tanjung Aru to the management of T.E.A.D.
T.A.E.D
I will convey that we do not yet have a comprehensive decision on development in Tanjung Aru. So perhaps, in the meantime, what has been proposed can be considered.
Thank you.
Okey Sindumin
Thank you, Datuk Speaker. Thank you, Honourable Chief Minister, regarding this (SFI) issue. We sympathise, actually, with these workers, but that (SFI) no longer exists. The company has been wound up and gone bankrupt; it is not there anymore. I agree that they need to look for alternatives, but actually, as the ADUN (State Assemblyman), we have not let them flounder. We have appealed for assistance for those who are critical. We sent food baskets to those in critical condition. We gave financial aid to those who are truly desperate. Then recently, when there was no water, our ADUN Office also gave tanks to them for water, not only Warisan, we gave too. Regarding the Lee & Man factory, I was not consulted in the past, but I also did due diligence. Actually, Lee & Man really wants to move to Sipitang, Sabah, because they have 6 paper mills in China, and 2 were ordered to close because China does not allow the import of paper from America for recycling. Their purpose in opening in Sipitang is to dismantle the existing factories in China and open in Sipitang as a recycling factory, that's all, Honourable Chief Minister.
Okay, thank you. Is there anyone else?
Honourable Member, may I have the floor? Thank you, Honourable Member. Yesterday in my debate I touched on this gold mine. This gold mine has been a source of revenue for our State since it began operating. I understand from the written reply in November last year that it is around 330 million, if I am not mistaken, and the royalties we collected were 16.5 million. However, what the Honourable Member did not touch on, perhaps I did not know, perhaps it was in the final part of the Honourable Member's reply. I only want to state: is there a firm action from the State Government to ensure this does not happen again? Secondly, will the State Government temporarily suspend operations once the MACC (SPRM) investigation is completed? This question I already raised in 2023 during the budget presentation, but it was not touched on, and it was not touched on today either. I do not know why it was not touched on, when this gold mine is our revenue. One more thing: I want to ask whether other companies have been awarded this gold mine in Lahad Datu or in other places. I hear there are more gold mines to be awarded to private companies. If we now talk about claiming 20% royalties from Petronas, that is not easy for us.
Please speed up a little, it is nearly Maghrib and the session is almost over.
Yes, yes, this is important, Datuk Speaker. Currently, the gold royalty is only 5% of our entitlement. I think this royalty needs to be reviewed, and also if the original agreement between the State Government and this company has been breached, and it is also proven that there was misappropriation, why not hand it over to a GLC? We take it back, and we are capable of operating it. Thank you, Honourable Member.
Thank you, from Merotai. The current Government is following the developments at the gold mine, and the Government will take enforcement action, especially to collect what should be given to the Government, its royalties or taxes. So now we are carrying out our efforts to ensure that. We were also shocked when we heard of such a situation. Therefore, I have asked the State Secretary to ensure the Government's interests are protected in the gold mining in Tawau.
Honourable Member, so this means the State Government will continue their operations even while the MACC (SPRM) investigation is ongoing?
Let us see first in terms of the law. We cannot simply take action immediately; we must also seek advice from our legal team and so on. If we shut it down, there could be tens of suits, and we would have to pay again. So we are looking at it in terms of the law and other matters. So, for the information of Honourable Members of this House, I have just received this information, our reserves.
Speaker, just briefly, regarding gold: will we audit whatever they have not paid since they started their operations?
We will, what is it called, audit it.
Forensic Audit lah.
Yes, if they have not paid for several years, we have to ask for it back.
And this includes timber royalties, which may have been smuggled or manipulated through abuse of power in the Government, undeclared, sorry, with the management and also the people who cut. Okay, thank you.
Insya-Allah. So, for the information of Honourable Members of this House, I have just received information regarding our reserves, our cash savings. I have just been informed that we have 6.786 billion in cash in our reserves now. For the information of the august House, so...
Honourable Member, what I actually heard, actually this is not reserve. Even the Minister of Finance understands that this money we use to pay salaries and to pay various things. Money is money, reserve is different. Reserve is not touchable. We keep it there as reserve, because I also manage 5.4 million, but that is not considered 5.4 billion. But that is not a reserve that we do not touch, because this is for payments to some extent, unless you don't touch it for one or two years, like a sinking fund, you know, that also has to be paid for one year. I don't think, don't let us confuse the grassroots out there, the people, that Sabahans have too large a reserve.
Yes, this is reserve. I think the Minister of Finance said it is a reserve that we keep and do not use, except in certain matters. It does not include paying salaries and so on, because, as with last year, our State operating and development expenditure was only just over 5 billion, whereas our revenue collection for the decade was 7 billion. So, what it means is the rest we put into reserves.
I understand, Honourable Member, what I understand, for example, is money we keep in more than how many banks, seven banks, ten banks, Public Bank, and Maybank, there 300 million, 400...
...million, 100 million, 50 million, for example. That is not, we could say, at times when needed, we have to use that. Sometimes there are situations of legal matters, there are circumstances. That is why, if possible, perhaps, ah, Honourable Member, looking from the perspective of the framework, but if I say it, it will be difficult, because the Honourable Minister of Finance, don't tell the truth, don't tell. Sometimes we want to ensure that at that time, I did not mention at all where we keep the money, where we are, to ensure sometimes this, because the Federal Government also looks to see whether there is money.
Okey.
Honourable Member, ah, we implement what is financial management, which I think is quite good. We give statistics on what we have, yes.
Secondly, it is not our intention to tell people, oh, we have a lot of money, that is not so (sound of table thumping), but it is my attitude to be honest with you. That is our reserve now, ah. The five that I mentioned earlier was last year, but we have developed our reserve. What I say is that I want to inform you that under the leadership of the Honourable Chief Minister, it was very stringent in terms of the use of finances. I know probably I will go out in these years as the most unpopular finance minister, because I am very strict. But for me, we have to develop our financial strength for future generations. Whatever the situation, we can still survive, so that is every, in the words the Honourable Member just used, without us making sure what needs to be spent and paid, yes, of course I will give priority.
Datuk Speaker, just quickly Menteri Kewangan, ah, as said I meant sale tax yang telah diberikan ataupun collection dari Petronas was unaccounted for only until 2000 and 20 March, selepas March okey, now those are not receivable dari awal good that you have manage. My question is dengan duit yang akan datang tahun depan from the collection ataupun your totally collection daripada SST ataupun Petronas, ini akan menambahkan kita punya reserve, because you are not to suspended anyway. My question is, dengan tiada air, dengan tiada…dengan problem jenama elektrik dan sekian-sekiankan. Why don’t you invest into this, lend it into the federal government. For instants Menteri JKR cakap tadi we are lacking of one point something billion for the southern grid lend it to the federal government let them owe you since you have that reserve.
To be fair we had not reach the level of Sarawak in term of financial had. So, I think kita kena terima hakikat kita belum kaya raya lagi. Harapan kita one day kita akan jadi kaya raya macam Sarawak juga...perlu kita ingat ya.
Continue, Honourable Member.
Datuk Speaker, let me continue. Once again I extend my heartfelt thanks to the Honourable Members who raised questions and issues related to the Chief Minister's Department. In our effort to bring this State forward, I invite all Honourable Members to set aside any differences and work together in promoting development for the welfare of the people of the State of Sabah. Finally, I take this opportunity to wish all Honourable Members present in this House a happy celebration of the Pesta Kaamatan, "Kotobian Tadau Tagazo Do Kaamatan". Thank you.
Thank you, Honourable Member. Honourable Members, the question before the House is the motion proposed on 23 May 2023, namely that we, the Members of the Sabah State Legislative Assembly, express our gratitude to Tuan Yang Terutama Yang di-Pertua Negeri for the policy speech delivered by Tuan Yang Terutama on Monday, 22 May 2023, be agreed to.
Honourable Members who agree, say "setuju" (agree). Those who do not agree, say "tidak" (no). The majority voting for agreement; the motion is agreed.
Honourable Members, the House is adjourned until tomorrow, Thursday, at 10.00 a.m., 25 May 2023.
Thank you. Assalamualaikum warahmatullahi wabarakatuh. (Three knocks heard) Adjourned as agreed at 7.04 p.m. Resolved: "That this House is adjourned now until tomorrow at 10.00 a.m., 25 May 2023."
SDN24052023/bnm