Selangor · 21 March 2022

14th Assembly, 5th session, 1st meeting · 240 turns · 26,748 words · official PDF ↗ · Digital Hansard ↗

196 of 240 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.

(Opening)

Secretary of the HouseEN

The Order of Business for the First Meeting of the Fifth Session of the Fourteenth Selangor State Legislative Assembly on 21 March 2022 began with the recitation of prayers.

Assistant Secretary of the House

Bacaan doa.

Oral QuestionsQuestions

Secretary of the HouseEN

The next item on the Order of Business. Questions.

SpeakerEN

Peace be upon you. Good morning to all Members of the State Assembly. I invite the Honourable Ijok.

Thank you, Mr Speaker. Ijok Question No. 67.

Oral Questions — 67. Waste Management in Ijok Industrial AreaQuestions

67. Asks the Y.A.B. Dato' Menteri Besar:-

a)

Why are industrial premises in the Ijok industrial area required to sign an agreement with KDEB (Kumpulan Darul Ehsan Berhad) to manage their industrial waste as a condition for obtaining an operating licence?

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, Honourable Ijok. Mr Speaker, every factory and industrial activity carried out within the Kuala Selangor Municipal Council area is required to appoint KDEB Waste Management Sdn. Bhd. as the contractor to manage non-scheduled industrial waste. This is a requirement of the Council to ensure that every non-scheduled industrial waste is disposed of properly, at registered sites, and hopefully this can resolve the problem of illegal rubbish dumping sites. Thank you.

Soalan tambahan.

Speaker

Silakan Ijok.

Thank you, Mr Speaker. Industrial operators there have met me. We have had discussions. The problem is that each industrial operator has a different type of activity, and the amount of waste discharged also differs. I understand why this condition was made, because it punishes all operators in one area. Because of one or two operators who commit the crime of illegal dumping, do not punish all operators equally. So, the question I want to ask Ijok is whether, before making it mandatory for all operators there to sign or enter into an agreement with a government-owned company, the government has conducted a study to classify the industries concerned and the quantities of waste they discharge, because half of that waste cannot be recycled, it is toxic. Half can be recycled. That means they are different. If we impose a uniform condition, it means operators who comply with the conditions are also penalised. That is all.

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, Honourable Ijok. I think the Honourable Ijok may not fully understand this new method. In fact, this is not a punishment. This is only a new method to ensure that the rubbish is disposed of at the right place, at a licensed place, a legitimate place. If they want to recycle some of the rubbish or industrial waste, the State Government certainly encourages it. And we have conducted many studies on illegal dumping sites or illegal dump sites. We found that most of the waste rubbish we find at illegal disposal sites is mostly industrial waste and also commercial waste. So we need a new method to ensure that the rubbish disposed of by every factory or in the industrial area is disposed of at the right place. If we do not use this new method, we cannot trace the rubbish back to where it was dumped. With the appointment of a contractor through KDEB, and KDEB will appoint sub-contractors, the sub-contractors will be equipped with tools or gadgets to make it easier for us to monitor the rubbish. Thank you.

Tuan Haji Saari bin SungibAMANAH · PHHulu Kelang

Soalan tambahan.

Speaker

Hulu Kelang

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

Thank you, Honourable EXCO. I want to ask, then, for how long can the tracking be traced? For example, if a lorry enters an industrial area to dispose of rubbish or clean a site, and then in that area there is a lot of silt or mud, and when it leaves, soil falls onto the road. That is a disturbance to the well-being or cleanliness of an area. So, in the tracking system that the Honourable Member has set up, is there a certain time, half an hour, one hour, within which we can trace where the lorry came from, whose company it belongs to, and call them to give an explanation? Does such a system exist in Selangor? In Singapore, for example, if a vehicle enters an area carrying soil stuck to its tyres, usually within half an hour they can trace it. At most, 2 hours.

Tuan Ng Sze HanDAP · PHKinraraEN

For refuse lorries or compactor lorries, the tyres become dirty after the lorry leaves the sanitary landfill, because the road leading into the site is an ordinary dirt road. If the tyres are dirty, one of the conditions is that the lorry must have its tyres cleaned before going out onto the public road. That is one of the conditions. And I see that this problem can be overcome once we have waste-to-energy. Once we have waste-to-energy, the disposal site will be different. It will no longer enter a sanitary landfill. It will enter a factory, and the area around the factory will become cleaner, and it will not dirty the tyres of the compactor or refuse lorry. Thank you.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

In Singapore this has existed for 20 years. This has existed in Singapore for 20 years. In Selangor it does not yet exist. So, if soil or rubbish falls onto the road, can we trace it? Whose rubbish is it? In Selangor.

Tuan Ng Sze HanDAP · PHKinraraEN

It is possible if rubbish falls from a refuse lorry. In fact, it would not happen if there were compactors, because all the rubbish is put into the compactor and compacted. For lorries like the roro lorries, there is a possibility. If rubbish falls, we can trace it, because every refuse lorry and every roro is equipped with a real-time tracing device. There is GPS. Thank you.

SpeakerEN

Alright. Sungai Ramal.

Tuan Mazwan bin JoharAMANAH · PHSungai RamalEN

Mr Speaker, Sungai Ramal Question No. 68.

Oral Questions — 68. Social Ills Due to Covid-19Questions

Tuan Mazwan bin JoharAMANAH · PHSungai RamalEN

68. Asks the Y.A.B. Dato' Menteri Besar:-

a) What social problems arose due to the COVID-19 pandemic?

b)

What actions has the State Government taken to tackle these social problems?

c)

What is the effectiveness rate in tackling these social problems?

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

Thank you, Mr Speaker, thank you, Sungai Ramal. The question concerns what social problems occurred in the state of Selangor as a result of the Covid-19 pandemic that has struck our state. There are three effects that I want to mention today. The first is the effect on mental health. The second is the effect on physical health, and the third is the criminal acts that have been recorded in our state. I will begin with family problems and mental health. This is based on data analysis from the Selangor Counselling Centre (PKS), where there was an increase in demand for counselling sessions during the COVID-19 period, especially online sessions. Among the complaints and problems received by our PKS are breakdowns in family relationships, namely between husband and wife and children. Secondly, it involves psychopathology, or psychopathology, relating to abnormal mental and psychological problems, namely depression, stress and anxiety about other matters. This data shows that those who attended the Selangor Counselling Centre in 2019 numbered 86. It increased in 2020 to 251. And in 2021 there were 214 people. The second social problem relates to physical abuse, especially physical abuse of children. Based on information obtained from the Selangor State Department of Social Welfare, the total number of cases of abuse and neglect from March 2020, which is when Covid-19 began, until March 2021 was 1,910 cases. The types of abuse recorded involved physical, sexual, emotional abuse and neglect. According to the report of the Department of Social Welfare, the highest was physical abuse, with 686 cases against children. The second highest was sexual abuse, with 606 persons. The third, neglect of children themselves, with 555 complaints. And the fourth was emotional problems, with 63 cases recorded. Meanwhile, the social problems involving crime, based on statistics obtained from the Royal Malaysia Police, Selangor State, which records the social crime index of violent and property crimes during the pandemic in 2020 and 2021, namely the most common was robbery in groups without firearms. A total of 1,748. Secondly, robbery without firearms, totalling 1,233. Thirdly, involving causing injury or fights or injuries involving 1,156. Fourthly, involving rape cases totalling 364, murder 80, armed robbery 1 case, and armed robbery 6 cases. These are crime cases. Meanwhile, the highest property crime is motorcycle theft, with 4,123. Secondly, general theft involving 4,122. Thirdly, housebreaking cases 3,393. Car theft cases 1,362, and finally, theft of vans, lorries and heavy machinery involving 359. The total number of social crime cases is 4,633, while property crimes total 13,359.

The second question, what actions has the State Government taken to tackle these social problems? There are three strategies we have implemented. The first is taking care of the welfare of families themselves or the people of Selangor. The second strategy is strengthening economic issues, and the third is safeguarding the health of our people in Selangor. In addition, the career carnival programme has provided opportunities to the people of Selangor, with a target of 25,000 job opportunities, thereby addressing the unemployment rate in Selangor, which is one of the causes of social problems in this state of Selangor. So our focus is on increasing programmes that provide job opportunities, thereby helping our people to solve the economic problems among themselves. Free psychological counselling services for the public through PKS, or the Selangor Counselling Centre, better known as the Sahabat hotline, are also provided as an alternative for rehabilitation.

This PKS is managed by the Human Resource Management Division (BPSM), State Secretary's Office, and has received cooperation from volunteer counsellors registered with the Malaysian Board of Counsellors. This PKS operates at PKNS Complex, Shah Alam. Apart from that, we also provide Protection and Rehabilitation Centres to provide direct protection, assistance and guidance to trainees and give them the opportunity to change their lives for the better in the future. The disbursement of funds totalling 305,000 in 2020 and 2021 to Protection and Rehabilitation Centres in Selangor aims to implement the Programme for Strengthening Self-Esteem and Mindset and to meet daily needs. Programmes of practice according to the teachings of the Prophet S.A.W., namely the Charity Programme and Briefing on Syariah Criminal Law organised by the Selangor Islamic Religious Department, were also organised, involving participants among young people. The social deviance prevention programme involving youths was organised by the Selangor Islamic Religious Council (MAIS), aimed as an early preventive measure to curb the approach to social problems occurring among the young. The programme for forming and strengthening the self-concept of youths, involving trainees of protection homes, aims to strengthen the motivation and identity of youths through the application of religious and counselling elements. The implementation of the discussion programme, namely 'Wira Muda Bebas Dadah' (Young Heroes Free from Drugs), conducted online, is among the relaxed discussion programmes, a simulation of programmes online to further highlight the potential of each individual young generation, focusing on the elements of creativity, innovation, positive music arts and inclusivity.

In addition, the Selangor State Police Contingent Headquarters (IPK Selangor), under Crime Prevention and Community Safety, has implemented a delivery service in all aspects, cooperating with the community and associations through the concept of community policing, namely preventive approaches such as the Police Cadet Corps and the Student Volunteer Corps involving students of higher learning institutions, by organising talks on sexual crimes and other crimes, as well as holding recreational dialogues and gotong-royong (community work). Apart from that, IPK Selangor also carries out enforcement by conducting several patrol operations such as 'OPS Benteng', namely joint patrols with the Malaysian Armed Forces, known as Joint Patrol, and establishing the Selangor State Police Contingent Auxiliary Police. What is the effectiveness of the things I mentioned just now? First, the number of cases has been seen to decrease between 2020 and 2021, a decrease of 2,519. In 2020, 17,244 were recorded, while in 2021, 14,725 were recorded. This is among the things in our plan and that we have done to tackle the social problem. As for the problems mentioned in foreign countries during the Covid-19 pandemic, such as in the Philippines, where illegal abortions occurred by families who could not afford it, we do not have statistics and do not record such data in Selangor. This means that there is only physical observation by them. The problem of pregnancy during Covid-19, it is not recorded whether it is included in social problems or not.

Tuan Mazwan bin JoharAMANAH · PHSungai Ramal

Soalan tambahan.

SpeakerEN

Additional question. Please.

Tuan Mazwan bin JoharAMANAH · PHSungai RamalEN

Thank you, Mr Speaker. I want to ask, because our focus is on the people, but at the same time the backbone for combating or tackling Covid-19 is our frontliners. So I have personally seen how the impact of Covid-19 or this pandemic has affected our officers as well. For example, in my own area, there was a social problem in a police station in my own area, where a party was held involving women, dancers and so on, who were also children from the surrounding areas, which caused a bad image for the security personnel, and then also caused stress to our officers, including those working in the local authorities (PBT). So my question is, how, is there any more specific attention given by the state government to our own staff so that they also feel the government cares about their welfare, and does not simply leave them alone and focus only on the people. Thank you.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

Thank you, Honourable Member. I think the matter mentioned by the Honourable Member involves enforcement officers, and at the Federal and State Government level, we rely on police reports received. If there are cases that are not reported to the police and do not reach us, perhaps we do not know whether the matter is true or not. If there are, we want to inform you that the programmes we mentioned are for everyone. Regardless of Federal or State agencies, or even ordinary citizens, we give focus. Only, Honourable Sungai Ramal, if information does not reach the State Government, it is rather difficult for us to act. Even if we read it in the newspapers and it does not reach us, perhaps it is rather difficult for us to take action. If the Honourable Sungai Ramal has detailed information as the Honourable Member just mentioned, perhaps you can submit it to us so that we can bring it to those with greater authority to take action.

Soalan tambahan.

Speaker

Taman Medan.

Thank you, Mr Speaker. Earlier, in the answer given by the Honourable Paya Jaras regarding several issues related to the Covid-19 pandemic, including household problems. Among them, divorce between husband and wife. But I think the Honourable Member may have missed something, because this case happened in my area, and perhaps among some of my colleagues and the Honourable Members all. Cases of husbands running away without news, or wives also disappearing, come to these Honourable Members' offices and say, "YB, please help solve my problem. My husband has run away, or my wife has run away." So what is your view and what action needs to be taken? I request an explanation or clarification from the Honourable Paya Jaras.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

I think cases of husbands running away or wives running away are received often by our elected representatives at the State Legislative Assembly level, right? Usually complaints only reach the level of our elected representatives. If the Honourable Member has detailed, specific information, the case, why? I do not know why they ran away. Is it a social problem or a big problem, husband Covid-19, wife not Covid-19? Or is it a problem of being stuck with horse machines, we do not know. Many cases happened both before Covid and also during Covid. If the Honourable State Assemblyman who has that information provides it in detail, we can investigate. Let us see. However, I also hope that the Honourable Members will jointly help the Government to solve problems together at the grassroots level, at the lower level.

Speaker

Semenyih.

Tuan Zakaria bin Hj HanafiUMNO · BNSemenyihEN

Thank you, Mr Speaker, Semenyih question number 69. Thank you.

Oral Questions — 69. Smart Selangor Mother's Love Programme ( Kiss )Questions

Tuan Zakaria bin Hj HanafiUMNO · BNSemenyihEN

69. Asks the Y.A.B. Dato' Menteri Besar:-

a)

State the total number of participants in the Smart Selangor Kasih Ibu Programme (KISS) in 2021. b)

What follow-up actions are taken to ensure that eligible residents can receive KISS?

Tuan Ganabatirau A/L VeramanDAP · PHKota KemuningEN

Mr Speaker, for the information of the Honourable Member for Semenyih, the number of participants in the Selangor Smart Mother Care Programme, KISS, in December 2021 was 18,685 recipients, comprising 16,313 KISS recipients and 2,372 single-mother KISS recipients. This figure is after the whitening of the KISS recipient lists carried out by all State Legislative Assembly (DUN) constituencies. To ensure that all eligible residents receive the KISS programme, whitening sessions were carried out in 2019 and 2021 by each DUN to screen mothers who remained eligible and those whose status had changed to ineligible. As a result of this whitening process, Selangor people who are eligible to receive KISS have a wider opportunity, since recipients who were no longer eligible have been removed from the recipient list. In addition, the State Government has rebranded the KISS programme as the Selangor Wellbeing Assistance Programme, BINGKAS, and improved its implementation by increasing the recipient quota from 25,000 recipients to 30 recipients, with the monthly assistance rate increased to RM 300 a month, and this programme is still awaiting the decision of the MMKN. Thank you.

SpeakerEN

Sentosa, absent. Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you, Mr Speaker. My question is number 71.

Oral Questions — 71. Abandoned Housing in Kuala LangatQuestions

Tuan Lau Weng SanDAP · PHBantingEN

71. To ask the Y.A.B. Dato' Menteri Besar:-

a)

There are 132 housing projects since 2018 that, up to now, have no solution. 40 of them are located in Kuala Langat and this figure is the highest. What efforts are being made by MPKL, PTDKL and LPHS to reduce this figure, for example Taman Seri Desa Jentayu?

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Mr Speaker, and also Banting. Banting asked about abandoned projects in Kuala Langat. So, for the information of the Honourable Member, there are currently 32 abandoned housing projects in the Kuala Langat District. Of that total, 12 are projects of Taman Sri Desa Jentayu. For your information, the Kuala Langat Municipal Council (MPKL) has divided these projects into 4 categories as a step to reduce the number of abandoned projects. The first is the category of abandoned development projects or those being rehabilitated. This includes, yes, their status: 2 projects that are nearly completed, including 1 project of Taman Desa Sri Jentayu 16. The second is abandoned development projects that are under rehabilitation planning by a rescue developer. There are 10 projects in that category of 32 under the rescue developer's planning and still at the stage of re-approval of the Planning Permission, including 6 projects of Taman Desa Sri Jentayu (5, 6, 8, 11, 12 & 13). Yes, the Taman Desa Sri Jentayu projects are many. Very many, from number 1 to 16 like that. The third is abandoned development projects under planning for infrastructure approval and handover to MPKL. This is 9 projects that should have already had infrastructure, but an audit has been carried out to determine whether the infrastructure has been provided or not. So this is to help re-approve the Planning Permission and the infrastructure approval, and the handover of infrastructure to MPKL, to enable homeowners to obtain individual building plan approval. And the fourth type that has been categorised by MPKL is static abandoned development projects. That means they have been unable to move for years, namely there are 11 projects for which there is still no information for rehabilitation purposes, including five projects under Taman Desa Sri Jentayu 1, 3, 6, 10 and 15. For the information of the Honourable Member, in resolving these abandoned housing problems, there are several parties that are responsible. If these are categorised, most of them should be directly under or under the approval of the federal government in the same list, but the 32 that I mentioned, however, we, the government under the Housing Board and also the PBT, always sit at the same table to resolve this matter, and for the rest I will provide it to the Honourable Member Banting.

This list is very long if it is to be detailed one by one. All 32 projects have been identified in the district. Sorry, sorry, in the Kuala Langat Municipal Council. Thank you.

Tuan Lau Weng SanDAP · PHBanting

Soalan tambahan.

Speaker

Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you, Mr Speaker. Thank you, the Honourable Member for Batu Tiga. My question is based on the answer provided to me through the answer given in the previous sitting of the House; there were in fact forty. Let me say it. If I am wrong, I am not sure, but what is certain is forty projects. And if it is forty out of 132, I think the percentage is very, very alarming and very worrying. Although now it is said to be 32, in fact, apart from what the Honourable Member just mentioned, this Taman Seri Jentayu, actually Taman Desa Sri Jentayu or Taman Sri Desa Jentayu, there are still many more projects from that list that have not yet had any movement based on the answer provided to the previous sitting of the House. So my question is, does the Government have a target to reduce the number of abandoned housing projects in the Kuala Langat area in this district to a level that is acceptable, because 32, even though now it is 32 out of 132, that is a very alarming percentage. Nearly one third of abandoned houses in Selangor are in one quarter of the Kuala Langat area. If we settle the Kuala Langat area, it means we settle one quarter of the problem in Selangor. I would like to request an answer from the EXCO. Is it possible for this to be reduced in an answer in the coming session? The question asked in the upcoming sitting is whether there is improvement.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you. Honourable Member, actually from 100, if I am not mistaken, 138 years ago we had reduced it to 108, yes. Of these 108, 40 last year in Kuala Langat were reduced by 8 to become 32. Why can we solve it so quickly now?

Yes, as people say, a bit faster, because we from LPHS have opened a Movement Room. Yes, a Movement Room, Mr Speaker, not only elections have a Movement Room. To solve these abandoned houses too, we have opened a Movement Room as early as this year, to keep track every week of the motions or matters that we have asked the responsible parties to implement and carry out. In the past, these meetings were only three or four months apart, but now we keep track of all of these and we make reports every week. So this is actually the effort made, but unfortunately in Kuala Langat there are many projects, private lands originally. So they built, and if we look at government policy after 2015, there was only then a policy that any development of four or more units must obtain Government approval. Before, it was not necessary. So these are old projects from 2007 that we must solve, which sometimes policy changes caused us to only find out now, oh, there are many projects that actually fall into certain categories. But that is my answer. Now we have a war room, and we will look at it weekly across Selangor, how many projects will be resolved, including neatly arranged village projects that exist throughout Selangor. Thank you.

MR SPEAKER

: Seri Setia

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Mr Speaker No. 72

Oral Questions — 72. Golden Age Friendly Scheme (SMUE)Questions

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

72. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What efforts is the government making to improve the method for senior citizens to obtain birth vouchers, as until now many still have not been able to obtain this benefit because the information and the date of voucher distribution are unknown?

Tuan Ganabatirau A/L VeramanDAP · PHKota KemuningEN

As everyone knows, the Jom Shopping SMUE Programme is one of the programmes that has received a very good and very encouraging response from senior citizens and OKU in the State of Selangor. The State Government of Selangor is known as a state that cares for its people, therefore, since this programme was implemented in 2019, a total of 372,453 SMUE Members have received benefits. However, various reactions have been received from SMUE Members and the DUN PKM regarding this Programme. Therefore, YAWAS has taken the initiative to draw up an improvement to this Programme together with UPEN, starting in 2022.

The method of voucher distribution will be carried out openly, namely SMUE Members may collect a RM 100 voucher at their respective DUN Offices throughout the year without having to wait for their birth month. This proposal paper has been raised to the MMKN level by UPEN, and UPEN is now conducting a comprehensive study to prepare a paper to the MMKN for approval.

MR SPEAKER

: Pandamaran

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Thank you, Mr Speaker. My question is No 73.

Oral Questions — 73. Covid-19 PandemicQuestions

Tuan Leong Tuck CheeDAP · PHPandamaranEN

73. To ask the Y.A.B. Dato' Menteri Besar:-

a)

State the Covid-19 cases by variant by year 2020 and 2021 in Selangor i) Covid-19 ii) Delta iii) Omicron iv) Alpha

b)

State the total number of COVID-19 cases by race in 2021 i) Malay ii) Chinese iii) Indian iv) Others v) Foreigners

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you, YB Pandamaran. Thank you, the Honourable Member, Mr Speaker. Pandamaran has asked about the Covid-19 variants. For the information of the Honourable Member, the Selangor State Health Department (JKNS) does not monitor the type of COVID-19 variant among patients in Selangor. The selection of patient samples for determining the type of COVID-19 variant is carried out at the federal level through the Ministry of Health Malaysia (KKM). Patient samples selected by the KKM will be sent to the Medical Research Institute (MRI), and the results obtained will be submitted to each state, including Selangor, according to the patient's address, for the purpose of patient monitoring by the District Health Office or the State Health Department. So, it means genome studies are not conducted for every patient. So we do not have a breakdown of the types of variant that infect our Covid patients. For 2021, the breakdown of Covid-19 cases by race is as follows:

RACE NUMBER OF CASES PERCENTAGE (%) Malay 419,041 57.6 Indian 75,957 10.4 Chinese 70,487 9.7 Others 5,722 0.8 Foreigners 156,893 21.5

That is all, thank you.

MR SPEAKER

: Sungai Panjang. Absent

MR SPEAKER

: Meru. Question 75 has been answered together with question No. 9.

MR SPEAKER

: Sungai Pelek. Congratulations on winning.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Thank you. My question No 76. Thank you.

Oral Questions — 76. Selangor Youth Movers (PEBS)Questions

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

76. To ask the Y.A.B. Dato' Menteri Besar:-

a)

Can the Selangor State Government consider establishing PeBS as a special post in the DUN office, like PWB, which is specifically to manage youth affairs in the DUN area?

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

Thank you, Sungai Pelek. Thank you, the Honourable Member, Mr Speaker. On behalf of the Honourable Members, congratulations on the victory. The one asking about PeBS is whether a special post is established at the DUN office as there is at PWB. The Honourable Member wants a special PeBS post at the DUN level. I would like to inform the Honourable Member that the PeBS we appoint now are the PeBS proposed by all of the Honourable Members. So when all the Honourable Members appoint, I; the State Government considers that to be the special officer of the Honourable Member at the DUN level. And the allowance paid is not from the Honourable Member, it is from the State Government. But use this appointment for the benefit of the Honourable Member's programmes at the DUN level. I must be firm here: if there are PeBS who do not function or who look for excuses not to be involved in our volunteer programmes. I have asked the Selangor State Sports Council (MSN) to identify these people so that we ensure they are given a reprimand or how the proposal from the ADUN itself is. Because today, some Honourable Members' ADUNs have made assessments of the Selangor MSN that give very low marks to PeBS, even though that is the Honourable Member's own appointment. If the Honourable Member does not agree, then suggest to us what action would be best. So the question of whether it is a special post, that is the special post that the State Government has given to the DUN, not one person but five people. PeBS with their secretary and all members within it are those whose allowances we pay. All of that is the right of the ADUN under the rules that we have established by the Selangor State Government.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Soalan tambahan

Speaker

Bukit Gasing

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Honourable EXCO. As an additional question suggestion, can the State Government consider raising the allowance of the Head of PeBS to RM1,500, the same as the status of PWB, and give them more room to carry out their duties and promote the agenda to youth.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

For the time being we maintain what is there, Honourable Member, because this is the reason: most PeBS under us, even though we allocate RM 20 thousand to them, not all of them utilise, fully utilise all the allocation. Some use only up to 40 percent, 50 percent, all of it. If the allowance becomes a constraint or the reason why they cannot move, we will review the allowance. Up to now I have not heard any complaints from below about this situation.

Tuan Lau Weng SanDAP · PHBanting

Soalan tambahan

SpeakerEN

Bukit Gasing once again.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Okay, just a little, there are indeed no complaints if they get RM 500, they get RM500, but if they get RM500 they definitely have another full-time job. Because RM 500 cannot do anything to support their living. So when they do another full-time job, their work movement also has a little time. If they get a bigger allowance, they can perhaps do half business, and with the other half of their time they can focus on youth work.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

I take into account the Honourable Member's view, but in my view, if we say RM 400 is not big or RM500 is not big, actually it is big, Honourable Member. It can cover one month's vehicle instalment, actually. It is something that the Government is committed to consistently, monthly, to them. Yes, but if we have a bigger room, why not we increase it. The whole of PeBS we also have 288 people, we are quite many compared with maybe other agencies.

Speaker

Banting

Tuan Lau Weng SanDAP · PHBantingEN

I would like to ask the Honourable EXCO, PeBS is a team work. Where the five AJK members must work as one team. What happens is that among those five people, not all of them have made contributions with the same level of commitment. Some have indeed been left behind and tucked away. Does the Government have a mechanism other than appointment, reprimand and marking by the ADUN, to reprimand or give a warning or, even worse, to terminate the positions of PeBS members who do not give high commitment automatically. And re-appointment is made quickly and effectively to ensure the movement of this team's work is not hampered. Right now I see there is none. Only when the time comes do we need to do that marking. Until the appointment period ends we will make a new appointment. But if we want to change, if we wait until then, it is already long. There is no time left. Yes, I would like to ask.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

Honourable Member, we did ask all PeBS to move as one team. And this is why we call this a jawatan kuasa (committee). Whether or not we change this PeBS, we do not need to wait for its maturity date. Everything is up to the Honourable Members at the State Legislative Assembly level. It is purely the discretion of our Ahli Wakil Rakyat. If the Honourable Member Banting feels that any one in that bunch of bananas is not nice, then we can always replace that fruit. Don't wait. It is all up to the Honourable Members of the State Legislative Assembly. That is why the appointment we make in the new system is through the ADUN itself. If the Honourable Member feels that in the five people, two are not suitable, then propose to us. At the Selangor State Sports Council, we will immediately take action on the proposal of the Honourable Member.

SpeakerEN

Kota Anggerik. Absent.

Speaker

Bandar Utama.

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Mr Speaker. My question is No. 78.

Oral Questions — 78. Climate Change Impact AgendaQuestions

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

78. To ask the Y.A.B. Dato' Menteri Besar:-

a)

Has the Selangor State Government carried out any studies, policies or initiatives related to climate change? If so, please list them.

Tuan Hee Loy SianPKR · PHKajangEN

For the attention of the Honourable Member, climate change refers to changes in the world's climate that have an impact on humans and ecosystems, whether directly or indirectly. It is expected that the negative effects of climate change cannot be avoided for several decades to come, and the mitigation measures taken are only aimed at reducing the impact of this phenomenon. However, if no mitigation measures are implemented at all, the earth's natural systems will not be able to adapt to the effects of climate change.

Honourable Members, the State Government places emphasis on and ensures climate-resilient development to meet the state's aspirations in leading sustainability. Among the important steps already taken by the State Government in addressing climate change is the development of the Green Technology Action Plan, one of whose initiatives is the implementation of the Bas Smart Selangor to encourage the public to use public transport, which in turn reduces carbon emissions. In addition, the State Government has also implemented green urbanisation, where the Low Carbon Cities Framework (LCCF) is adopted in policy planning at the level of all local authorities (PBT).

In addition, the State Government continuously supports initiatives by local authorities (PBT), departments and state agencies to intensify programmes that can reduce the impact of climate change in the long term, such as the Malaysia Greening Programme, namely the Campaign to Plant 100 Million Trees, which is currently being carried out over these five years, and to establish and implement the Low Carbon Cities Framework (LCCF) in Selangor State, and participation in the Earth Hour campaign, in which the State Government will make this campaign an annual programme of the State of Selangor to support efforts to reduce carbon emissions through electricity. The Selangor State Government is also installing solar panels on State Government buildings in Selangor, namely at the Sultan Salahuddin Abdul Aziz Shah Building and nine buildings at each District and Land Office in the State of Selangor. The agreement, namely the Supply Agreement of Renewable Energy (SARE), involves the Selangor State Government, G Spark Sdn. Bhd. and Tenaga Nasional Berhad, and the installation of these solar panels is under the Solar Energy Purchase (SEP) Scheme, with a contract period that has already been agreed at 15 years with a higher saving rate. Apart from that, the State Government has also approved the development of the Selangor Large Scale Solar (LSS) farm at Ladang Bukit Kerayong, Klang, to Sharp Ventures Solar Sdn. Bhd. Furthermore, in January 2022, the Selangor State Government approved the establishment of the Special Committee on Climate Change, which will be responsible for studying issues of climate change and global warming in the State of Selangor. Through this Committee, the State Government will draft the direction and comprehensive mitigation and adaptation measures for climate change, such as establishing the Climate Change Action Committee, the Climate Change Action Council of the State of Selangor, comprising academic figures and experts in climate change. This Committee will be responsible for examining climate change initiatives in line with the existing national policies in addressing climate change issues. The State Government, through the local authorities (PBT), will also adopt these policies in shaping balanced development.

Speaker

Bandar Utama.

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Honourable Member, Mr Speaker. Bandar Utama only wishes to ask, first of all, thank you for the explanation of the various types of initiatives and programmes held by the State Government. Bandar Utama would like to ask whether, from all these programmes and initiatives, we have achieved the outcome with permission that is desired, the KPIs that we have set, and the direction in terms of the overall picture with permission set by the State Government. Thank you.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Honourable Member for Bandar Utama. Indeed, the State Government has our goal, where we will try to achieve a reduction in carbon emissions of 45% by 2030, and we will target the figure to zero by 2050. So, that is our goal.

Speaker

Satu lagi.

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

One more. Thank you, Mr Speaker. I just want to seek clarification on the carbon emission reduction target to zero percent by 2050, what initiatives will be carried out to achieve the target for all the initiatives. Has this been explained just now, or are there other initiatives? Thank you.

Tuan Hee Loy SianPKR · PHKajangEN

We still have 28 years to achieve this zero net carbon emission, and our policy depends heavily on the Centre, the Federal Government. That is why in the previous budget we had already reduced taxes, and the tax on electric cars has been reduced or not implemented, and we hope that within these five (5) years the use of electric cars will be encouraged in Malaysia, especially in Selangor. And for the future, we will require the PBT to require future developments to build charging stations, which must be provided in all commercial areas, with the percentage to be determined. We will encourage the use of electric cars in the future. So that is the target for these next five (5) years, where we expect the use of electric cars to increase in the future.

Speaker

Batang Kali.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

Thank you, Honourable Member, Mr Speaker, congratulations on your big win. My question is number 79.

Oral Questions — 79. UMW Automotive CorridorQuestions

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

79. To ask the Y.A.B. Dato' Menteri Besar:-

a)

It is informed that the Serendah area is categorised as a corridor of the UMW High Value Performance Manufacturing Park. What are the State Government's plans to implement value-added development by taking into account the impact on the surrounding areas?

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker, UMW Development Sdn. Bhd. is developing land measuring 765.63 acres as the Serendah High Value Manufacturing Park, or in English, the Serendah High Value Manufacturing Park (Serendah HVM). The main component of this development is the construction of a factory assembling Rolls Royce engine casings for aircraft, in English, with permission, Rolls Royce Fan Casing for Airbus aircraft, by UMW Aerospace. In addition, this Industrial Park also accommodates high-value industry players such as T7 Killgour. UMW has also relocated UMW's facilities in Shah Alam to Serendah HVM. Based on this development, the MPHS, or Hulu Selangor Municipal Council, through the Hulu Selangor District Local Plan 2035, has designated the Serendah area as a Transport Manufacturing Hub, taking into account UMW Aerospace, PERODUA and Tan Chong & Sons Motor as the main nucleus for the automotive industry. The MPHS, together with Invest Selangor, will continue to promote and attract more major automotive industry players and vendors to set up assembly plants not only in Serendah but also in the industrial lots of Sungai Choh, Bandar Bukit Beruntung, Bandar Bukit Sentosa and Bandar Sungai Buaya. The Serendah area is also planned as an inland port and Logistics Hub, with the planned ECRL route and station in Serendah. Thank you.

SpeakerEN

Dengkel is not present. Afternoon session, has an illness that prevents sleeping. Kota Damansara.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

Thank you, Mr Speaker, Kota Damansara Question 81.

Oral Questions — 81. Tasik Cova - Maintenance and ConservationQuestions

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

81. To ask the Y.A.B. Dato' Menteri Besar:-

a)

To what extent has the government taken, and will it take, action for that purpose?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member for Kota Damansara, Mr Speaker. Congratulations to the Honourable Members who won. I am answering this question because it is related to the Local Government Executive Committee (EXCO), so I have taken up this task to answer because there is also an infrastructure component here. In the Government's efforts to ensure maintenance and rehabilitation are carried out at Tasik Cova, the scope and field of responsibility have been assigned to the following two (2) agencies. The first, maintenance and cleaning within the recreational lake up to the embankment, is carried out by the Selangor State Irrigation and Drainage Department (JPS). Maintenance of the land area and gardens is carried out by the Petaling Jaya City Council (MBPJ), with an allocation of RM 436,000.00 in 2022. In addition, the Council has also allocated a budget of RM 200,000.00 to upgrade the recreational facilities at this lake in Phase 1 in 2022. That is all.

Tuan Shatiri bin MansorPKR · PHKota Damansara

Soalan tambahan.

SpeakerEN

Yes, Kota Damansara.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

Thank you, Mr Speaker, for the answer. For the information of Members of the House, the Tasik Cova issue, since 2014 when I was a Council Member, this issue has been discussed many times in the House and also at the District Office. My question is, how serious is the State Government's commitment, guarantee or political will to act to resolve the Tasik Cova problem, considering that the confidence of residents around Tasik Cova has declined because several decisions have been made and have been changed back and forth. I hope this time, I hope, what guarantee does the Government have to resolve the problem at least before the end of this year.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member for Kota Damansara. I have indeed been waiting for that supplementary question, and as I mentioned during the winding-up on Thursday last week, the State Government's efforts take into account that lakes or ponds with the potential to become retention ponds and also storage will be managed holistically to ensure that our efforts to address the flood issue can be implemented well and in an orderly manner. This pond is certainly quite a large pond, if I am not mistaken 26 acres, and it is also a recreational park, so it has two (2) functions there.

For the information of the Honourable Member for Kota Damansara, I have actually studied the proposal from JPS to be brought to MTES on how immediate planning will be done at Tasik Cova, but I did not mention it here because we are only about to bring it to the Selangor Economic Action Council (MTES). What happened was that previously we asked the SEMESTA Group to manage the pond because there is sand potential there, but according to our design methods it was required, but when a review was done they found it was not economical for them to manage. So they handed it back to us, to JPS, and we will discuss with MBPJ how to manage it, and the proposal, in principle, that I can inform the Honourable Member is that we will make a declaration of part of this lake, reclamation, and we propose that the land will later be managed by the private sector for us to open, perhaps through tender, about five (5) to six (6) acres, and they will be responsible for ensuring the design of this lake and initial maintenance, including dredging and so on, carried out together with the reclamation. That is being worked on and will be brought to MTES to obtain approval from the State Executive Council (MMKN) later. That is the concept proposal, that is what we want to do, but I hope the Honourable Member will be informed from time to time of these decisions to ensure Tasik Cova can be managed not only on an ad hoc basis but on a continuous basis. That is all, thank you.

Speaker

Kampung Tunku.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Thank you, Mr Speaker, my question is number 82.

Oral Questions — 82. Flood AidQuestions

Puan Lim Yi WeiDAP · PHKampung TunkuEN

82. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What types of assistance have been extended to business or shop owners affected by flooding?

b)

What is the amount of State Government allocation that has been extended?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Kampung Tunku, for the question raised, and as I have explained to some extent during the winding-up the other day, the type of assistance that we have channelled to these traders and entrepreneurs is by facilitating our HIJRAH offers. Based on records obtained from January and February, we have settled or channelled more than RM 10,000,000.00 in loans, mainly to several stalls and also grocery shops and car workshops that want to improve or add to their business stocks that were affected by the recent floods. So there is no grant assistance, but the assistance is given in the form of loans, where these loans will help them to run their businesses as a whole. As I informed earlier, up until last Tuesday, the assistance that we have channelled amounts to RM 118,000,000.00, and we have a remaining eight (8) thousand families, which means we need approximately RM 8,000,000.00 more to channel, and what is in the reserves of all the District Offices, as channelled by our Financial Officers and the State Government at all District Offices, has a balance of about RM 16,000,000.00. This means that by 31 March 2022, we are very confident that the complete list with no constraints can be settled, and after that we will give another one month to see who has been left out, who has appeals and so on, to settle the granting of BSB or Selangor Bangkit Assistance. That is all, thank you.

Speaker

Sementa.

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

Thank you, Mr Speaker. My question is number 83.

Oral Questions — 83. 5G Access NetworkQuestions

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

83. To ask the Y.A.B. Dato' Menteri Besar:-

a)

To what extent has the 5G network coverage in Selangor reached so far? Does it extend to the outskirts of towns and also villages?

b)

To what extent is the State Government administration prepared to accept this technology, and how much allocation has been provided for it?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Member for Sementa, for the question raised, which specifically refers to the Achievement of 5G Coverage in the State of Selangor. The implementation of the 5G network coverage in Selangor is being carried out in phases. According to report data from the Malaysian Communications and Multimedia Commission (SKMM), as of February 2022, the implementation of Phase 1A in 2021 covering Cyberjaya, namely 28 sites, has been successfully completed. A total of 1,551 5G network structures in the State of Selangor for Phase 2 will be installed in 2022. If I may elaborate a little on the installation plan for the 5G network in the State of Selangor for 2022:-

Table 1: Plan for the 5G network in the State of Selangor for 2022.

District Q1 Q2 Q3 Q4 Total Sepang 42 54 59 30 185 Petaling 136 165 115 144 560 Klang 67 76 69 60 272 Hulu Langat 63 89 108 85 345 Gombak 53 58 42 38 191 Total 361 442 393 357 1551

In total, 1,551 transmitters or structures will be built to encourage the installation of 5G. For the information of Members, 5G network technology is capable of providing broadband speeds of 10Gbps with 1ms latency. It is also able to serve 1 million devices per square kilometre.

b) The State Government of Selangor, through Smartsel Sdn Bhd, is drafting government proposals and a cooperation proposal with Digital Nasional Berhad (DNB) as the wholesale 5G network provider in Malaysia. Existing mobile telecommunications companies Celcom, Maxis, Digi, Umobile, TM, Webe and Yes will lease 5G network services from DNB. Smartsel will also play a role in the development of 5G infrastructure in industrial areas and communities in the State of Selangor.

This means that, overall, this project is under Digital Nasional Berhad (DNB) and we will only collaborate with them to extend, especially our focus from now on, to industrial areas that need or will obtain information and also this 5G technology. Thank you.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Soalan tambahan.

Speaker

Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Speaker. Whenever telecommunications structures go up, especially in residential areas, they will cause complaints from the public. But we also want 5G row out quickly because we want to use phones at high speeds. So, what is the procedure, for the State Government to expedite DNB's company application and obtain their approval and handle public complaints, moving forward, because the 4G towers have been installed for a long time. The 5G towers that are now going up this year will cause many complaints, and if we do not have an SOP to handle these complaints professionally, perhaps it will drag out the row out of 5G.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Bukit Gasing. Since 2015, as a result of several past agreements that we have revised, we have begun implementing what is called a one-stop agency. The one-stop agency operates under the Selangor State Government, which holds part of its ownership through MBI, and it serves as a single point for ensuring that the SOPs and procedures for telecommunications transmitters are carried out. Part of its function is also to legalise transmitters that were erected illegally or not in accordance with the law. There are certain regulations, as with the example we have harmonised across the state, where the local authorities (PBT) have their own specific responsibilities but these are consistent. What this means is that whether they do it in Kajang, or in Subang, or anywhere else, the method is almost 100% the same. This one-stop agency is the result of our revision of the earlier arrangement with KJS, or the Kumpulan Jaringan Selangor, which was signed under past agreements around 2004 to 2005 to meet the needs of telecommunications transmitters.

However, 5G does not require as much as the transmitters we see. This is because 5G requires a network, or closeness, between one transmitter and another that is nearer and lower, because 5G is fast but, I can say, it is also delicate. Its delicacy is that it rarely can penetrate. It cannot pass through walls or glass, and it is easily reflected. Therefore it requires spacing between one transmitter and another that is lower, and also between one transmitter and another that is closer. So in areas like Petaling Jaya, the sites it needs are actually on buildings, compared with the transmitters we see, the tower transmitters or the tall substations as we see them overall. I actually received a briefing from Maxis just a few days ago together with SS, the State Secretary, and the Honourable Izham. They themselves also encourage the installation of fibre optics in the state of Selangor, which to some extent strengthens and streamlines our Internet access, including in rural areas. Thank you.

Speaker

Teratai.

Tuan Lai Wai ChongDAP · PHTerataiEN

Thank you, Mr Speaker. My question is number 84.

Oral Questions — 84. Allocation for the application for road construction from Jalan Cheras Hartamas to Persiaran Lemak Taman SegarQuestions

Tuan Lai Wai ChongDAP · PHTerataiEN

84. To ask the Y.A.B. Dato' Menteri Besar:-

a)

MPAJ has received and approved the opening of a road from the open space at Jalan Cheras Hartamas to Persiaran Lemak Taman Segar. Will the Selangor State Government allocate funds to MPAJ for the project to build a road within that area?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Teratai. Teratai is asking about the allocation for the application to build a road from Jalan Cheras Hartamas to Persiaran Lemak Taman Segar. For the Honourable Member's information, the Ampang Jaya Municipal Council (MPAJ) has also carried out a site visit together with the Honourable Teratai and representatives of the Cheras Hartamas residents on 28 February 2022, to the location where Jalan Cheras Hartamas is to be connected. Following discussions between MPAJ and the preparation by the Technical Division of specifications for the works, the cost of building this road is estimated at around RM 510,000.00, and MPAJ is ready to submit an application. However, we from the State Government have not yet received any official application from MPAJ, and we will study the application when it reaches my office, or wherever, for us to consider. Right now we are indeed in the process of examining various applications for allocations to ensure our infrastructure is in good condition. Thank you.

Tuan Lai Wai ChongDAP · PHTerataiEN

Mr Speaker, supplementary question.

Speaker

Silakan.

Tuan Lai Wai ChongDAP · PHTerataiEN

I understand that a telco tower has been built on the proposed site for this new road. So, has the approval of this telco tower been considered in the infrastructure for opening this road?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member. We will check the position of this telecommunications tower pole, because in Selangor there are indeed many illegal structures. There are indeed many that are not legal, and we are in a phased legalisation process that is being implemented. So we will study and look carefully at the status of this telco tower. Even if it is legal, we will see how the method goes if this road is to proceed. There may be construction methods and so on. Thank you.

Speaker

Taman Templer.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

85. Thank you.

Oral Questions — 85. Population Density in Kg Selayang BaruQuestions

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

85. To ask the Y.A.B. Dato' Menteri Besar:-

a)

Has the government taken steps to make Kampung Selayang Baru into two administrations of MPKK because of population density?

Tuan Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Mr Speaker. Thank you to the Honourable Taman Templer, who asked whether the government has taken steps to make Kampung Selayang Baru into two administrations of MPKK because of population density.

Mr Speaker, the State Government is well aware of the need for this, given that Kampung Selayang Baru is one of the villages with high density, with more than 72 thousand residents. However, the State Government has not yet taken steps to make Kampung Selayang Baru into two administrations. For the information of the House, reducing and dividing village boundaries or creating a new MPKK is not the only method that can be adopted in overcoming the problem of high-density villages. With reference to the Selangor State Village Strategic Direction Plan 2035 (PHTSDNS 2035), the designation of 'Village Enclaves', which refers to the remaining residential areas that still have rural physical characteristics, including natural landscape and village character, kampung-style house architecture and neighbourhood yards with a village concept, for a village requires further study, in which other studies that can be considered apart from reducing and dividing boundaries include maintaining the boundary, and also reducing the boundary, which must take priority. Apart from that, the Gombak District and Land Office can also submit proposals to the State Government for the purpose of creating a new MPKK for consideration, as has been done by the Kuala Selangor District and Land Office to create the MPKK of Kampung Tanjung Piai and the MPKK of Kampung Tanjung Keramat on geographical and political grounds, and this was approved by the Selangor State Government. Therefore, the State Government will request the Gombak District and Land Office to work together with PlanMalaysia@Selangor to identify the best method to be taken specifically regarding the situation in Kampung Selayang Baru, and subsequently prepare a proposal paper for the State Government's information and consideration for approval. Thank you.

Speaker

Taman Templer.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Not a supplementary question, but an additional expression of views. I already brought this issue up three years ago. The residents of Kampung Selayang Baru are indeed very dense. It covers 2 state constituencies. It covers Templer, it covers Sungai Tua. Imagine Selayang Baru, around 80,000 residents, budget 10,000. 80,000 are residents. Just now you said 10, so the problem is 20,000, 80,000 residents, 80,000 is one Parliament. One Parliament, do not play around. If it is split into 2, it can be 2 state constituencies, you know. But 1 Village Head, I ask the EXCO to please find out how to split the boundary or split the title deed, split whatever is appropriate, as I promised, if possible 2 MPKK after this. Thank you, Honourable Speaker. Congratulations.

Tuan Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Honourable Taman Templer. That is what I informed the House earlier, that we are waiting for the proposal from the Gombak District Office to be submitted and discussed with PlanMalaysia@Selangor so that it can be brought up to the decision to be made by the Selangor State Government. Thank you.

Speaker

Sijangkang.

Thank you, Mr Speaker, question 86.

Oral Questions — 86. Increase in Covid-19 Cases in SelangorQuestions

86. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What are the latest actions that have been taken to curb the resurgence of COVID-19 cases?

b)

Has the immunisation rate in Selangor succeeded as expected?

c)

How has the performance of SUKA been in efforts to curb COVID-19 infections?

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Sijangkang, and thank you, Honourable Speaker.

a) For the Honourable Member's information, the latest actions and measures to curb the resurgence of Covid-19 cases in Selangor are in line with the guidelines and strategies set by the Ministry of Health Malaysia (KKM). Among these measures are:

1) Intensifying promotion and health education activities for the general public to increase coverage of complete Covid-19 vaccination and booster doses, and Covid-19 vaccination among school students and children aged 5-11;

2) Intensifying enforcement through the Inspectorate and Legal Unit (state and district) at public hotspots and premises and programmes that have the potential to become gathering places for the public, to ensure SOP compliance;

3) Changing the screening strategy from using RT-PCR to using self-test RTK-Ag as the confirmatory test for positive cases. This measure is to speed up control and prevention action, including the procedure for isolating cases and quarantining close contacts, which is now quicker (without having to repeat the RT-PCR test);

4) Ensuring that stocks of self-test RTK-Ag at the district and state levels are always in sufficient quantity; and

5) Obtaining cooperation from various parties and agencies, whether state government agencies or non-governmental organisations (NGOs), for the purposes of:

i. Increasing coverage of primary and booster vaccination, especially among children and at-risk groups; ii. More comprehensive and effective cultivation of the new norm; iii. Raising awareness to immediately carry out self-testing if symptomatic and to continue isolation if positive; and iv. Encouraging the general public to empower themselves through the use of the MySejahtera application, which can help manage cases and close contacts digitally and more quickly, thereby reducing the burden on public health facilities.

(b) The National Covid-19 Immunisation Programme (PICK), which covers adults, adolescents and children aged 5 to 11 in Selangor State, is in line with the implementation of the programme at the national level. The achievement of PICK in Selangor State as of 1 March 2022 is as follows:-

1. For adults, first dose: 4,334,507 adults have received it, which is 95.2%. Second dose: 4,315,186, which is 94.8% of the adult population, and booster doses totalled 3,728,125, which is 81.9% of the adult population.

2. For adolescents, so far 531,193 have received the first dose, and for the second dose, the second dose is 482,503, which is 84.8%. The first dose has covered 93.3% of the adolescent population, and the second dose 84.8%.

3. For children aged 5 to 11, on 1 March we had only reached 167,388, which is 22.9% of the child population, but the latest figure, as of 15 March, for children, we have already reached 41% for children, yes.

So the overall achievement for Klang Valley is 5,033,038 cases, and for the second dose, the first dose, for the second dose 4,797,689 cases, and for booster doses 3,728,125.

The target coverage for the children category is 70% by April. Overall, the PICK programme in Selangor State has achieved the target set at the national level.

The Honourable Sijangkang's question concerns the performance of SUKA in efforts to curb Covid-19 infections. Yes, the establishment of the Selangor Community Health Volunteers (SUKA) in 2021 is one of the State Government's efforts to empower the community's role in enhancing advocacy and public awareness on public health. SUKA was established with a larger objective, not merely to help the State Government tackle Covid-19, but also to promote and encourage a healthy lifestyle culture, help reduce the incidence and prevalence of communicable and non-communicable diseases, and also to act as a liaison and facilitator for conveying the State Government's information and initiatives on health to the people of Selangor. SUKA currently has 1,800 registered members across Selangor.

It was established in 2021 when we were facing the Covid-19 pandemic at its peak. Therefore, all SUKA members were trained by the Malaysian Public Health Association (PKAM) through 8 modules related to Covid-19 from August 2021 to October 2021, covering modules such as Home Care and Monitoring of Covid-19 Patients, PPE and Sanitation, Psychological First Aid (PFA) during Covid-19, Covid-19 Vaccine, Volunteers in the Field and others. During this phase too, all SUKA members went out and carried out almost 123 programmes and activities related to Covid-19 in local communities over the 6 months of last year. In addition, SUKA also assisted Covid-19 patients by providing transport services to the Covid-19 Assessment Centre (CAC), distributing medical aid to patients' homes, and providing support assistance at quarantine centres.

SUKA members also held briefings and awareness campaigns on healthcare and appropriate measures to reduce the risk of Covid-19 infection. Based on the activities and programmes carried out by SUKA since its establishment, which is less than a year, this is a satisfactory achievement and deserves continued encouragement and support. The State Government will continue appropriate training and courses for SUKA this year to ensure all SUKA members are equipped with sufficient knowledge and expertise in the field of public health. Okay. Thank you.

Soalan tambahan.

Speaker

Silakan Sijangkang.

Thank you, Mr Speaker. I find that infections among children aged 5 to 15 are also seen to be

increasing, yes, especially when the reopening of the school session happened at the end of the school session last year, yes, and as the EXCO informed earlier. The total is 40%, 42% so far, and it is expected to be 70% by April this year, and today the school session begins. I managed to go to a school earlier and saw that, I observed that generally in the class, only about 20% or so had immunisation. Perhaps, is there an initiative by the State Government to go down to schools to provide immunisation, especially those under the State Government, yes, to further encourage the immunisation rate, even though it is not compulsory, but I believe as a matter of awareness and also to reduce the risk of bad effects if they become infected. Thank you.

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Sijangkang. It is indeed a very good question because our concern is that the infection may spread or erupt again among children, but we must remember that permission to vaccinate children rests with their parents, yes. We cannot force vaccination on them, apart from giving awareness and also convincing them that this vaccination is to protect their children, yes, and indeed schools under the State Government can offer it to Religious Primary Schools and so on. However, good cooperation in carrying out child vaccination is indeed under the supervision of the Selangor State Health Department, and this vaccine will, in a few days, also be made available, as people say, to GP clinics that are now implementing PICK and SelVAX. SelVAX for children too, we will start in the near future, yes, but for now we can offer and encourage, but we cannot force them. Thank you.

Speaker

Taman Medan.

Honourable Speaker. Taman Medan question No. 87.

Oral Questions — 87. Improving the Quality of Mosque and Surau OfficersQuestions

87. To ask the Y.A.B. Dato' Menteri Besar:-

a) Are there any proposals to improve the quality of professionalism of mosque and surau officers?

b) Has any programme been organised for this effort?

c) What are some of the programmes that have been organised or implemented for this effort?

Tuan Mohd Zawawi bin Ahmad MughniPKR · PHSungai KandisEN

Thank you to Mr Speaker and to the Honourable Taman Medan, who has raised a question regarding efforts to improve the quality of professionalism of mosque and surau officers in Selangor State.

The Selangor Islamic Religious Department always organises programmes to add knowledge and enhance skills among officers from among Imams, Bilal, Treasurers, Secretaries, and also involving Muslim women, and even involving cemetery management. During this pandemic, programmes have been conducted online, yes, and apart from that, programmes to help Mosque Committees understand the regulations on mosques and surau in Selangor State, together with special briefing programmes on the Selangor State tauliah regulations, continue to be held to provide understanding to mosque management in Selangor State. That concludes my reply, thank you.

Soalan tambahan.

SpeakerEN

Please, Taman Medan.

Sometimes we receive complaints from among mosque and surau congregations about the quality of mosque officers, especially Imams, where many of these officers, from among the Imams, their ability to carry out their duties is something that can be questioned. For example, their Quran recitation is really poor in terms of quality and so on.

Likewise, apart from that matter, what efforts are being made to improve the situation, yes, and my next question, for example, is whether there are any proposals, for instance from the experience that Taman Medan went through when he was a mosque officer before, for improving quality in other aspects, such as courses related to astronomy (falak) and so on. So I seek clarification from the Honourable Sungai Kandis.

Tuan Mohd Zawawi bin Ahmad MughniPKR · PHSungai KandisEN

Thank you, Taman Medan, for the supplementary question on cases and issues relating to the quality of imams serving in mosques and surau. For the information of the Honourable Members, imams appointed by the congregation (kariah) sometimes do not meet the required standard, because in some areas it is quite difficult to find capable imams who have the qualities of a good imam. Nevertheless, enhancement programmes are organised by the mosques themselves and also by the Selangor Islamic Religious Department (JAIS) to improve the services or quality of the imams in mosques and surau in the State of Selangor, and concerning the added value of knowledge such as financial management and falak (astronomical) knowledge management, these are indeed held continuously, yes, but sometimes attendance by participants is... yes. I would also like to urge the committee that has been appointed that, when they receive invitations from the organisers, they give commitment and priority so that we can raise the quality of mosque and surau management in the State of Selangor. Thank you.

Speaker

Subang Jaya.

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Mr Speaker, question 88.

ORAL QUESTION FROM THE HONOURABLE MEMBER PUAN MICHELLE NG MEI SZE (N31 SUBANG JAYA)

TITLE: DROUGHT 2025

88. To ask the Y.A.B. Dato' Menteri Besar:-

a) Please state the steps being taken by the State Government to face the prolonged drought from 2025 to 2035 predicted by NAHRIM, particularly in terms of (a) water sustainability and (b) food security.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member for Subang Jaya. I consider this question very important, and in fact the answer is long, but I will try to summarise. The Honourable Member for Subang Jaya asks about the steps taken by the State Government in facing the drought expected to occur from 2025 until 2035, within that range, yes, which is predicted by NAHRIM, particularly in terms of water sustainability and food security.

For the information of the Honourable Member, NAHRIM, or the National Hydraulic Research Institute of Malaysia, is responsible for research on water hydraulics and hydrology. It has predicted that an extreme drought will occur in Peninsular Malaysia in a year between 2025 and 2035. In addition, the Department of Meteorology also predicts for 2026, which is consistent with what NAHRIM has predicted.

In the State of Selangor, a reduction in rainfall in the range of 0.1% to 36.3% is expected. If NAHRIM's prediction occurs, and the likelihood is high that it will occur because we are already in the eighth cycle, the eighth year has already arrived this year, and normally the eighth to tenth year is when it usually happens, but in this unpredictable weather it is difficult for us to predict, yet what is certain is that it will happen. When? Within this expectation, I think we must make preparations. If it occurs, it will affect raw water resources, where river levels will decline and reduce river baseflow, and will consequently cause dam levels to decline and disrupt the raw water supply for the relevant plants. If there is no thorough preparation, large-scale water supply disruption is expected. If this happens. If we have one extreme of a big flood and another extreme of a big, long drought. Therefore, the State Government of Selangor, together with all agencies, is making the following preparations:- 1. Planning under the Raw Water Guarantee Scheme (SJAM), which covers 2 phases. Phase 1 is to address raw water pollution in the Selangor River and Semenyih River, which supply nearly 70% of our water supply, and Phase 2, which we have already started, is ensuring sufficient raw water in facing the dry season. Mr Speaker, time is up, I may continue, yes. A little more, yes. The second one has already been running under Phase 2 of the Raw Water Guarantee Scheme. The State Government focuses on the water resource management programme that I explained at length last Thursday, to ensure that storage is sufficient to meet demand at that time. In this regard, the State Government of Selangor, through the Selangor Water Management Authority (LUAS), has already implemented and is in the process of completing the development of an inventory of all reservoirs, lakes and water bodies that we think have the potential to be used as supply sources. And these sites are audited in terms of soil ester, water quality and the volume of water present in these water bodies. The State Government of Selangor will make use of all the reservoirs and lakes that have been listed as alternative water sources ....

SpeakerEN

Honourable Member, please sit down, submit it in writing.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

A little more. During the dry season, apart from the reservoirs under pumping operation at our ORS and ORS 600, and also in the future, ORS 3,000. So I will table, at another time, a complete study on how to face this dry season. Thank you.

SpeakerEN

Thank you, Honourable EXCO Member for Pandan Indah. Honourable Members, the time has reached 11:30 am, and therefore I adjourn the question session for the next business.

Motion No. 1 of 2022Motion

Secretary of the HouseEN

Order of business for the next meeting. Motion No. 1 of 2022. Motion under Standing Order 76(5) by the Honourable Member for Kota Damansara.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

Mr Speaker and Honourable Members, I wish to move a motion which reads as follows. Whereas, pursuant to Standing Order 76(5), the Standing Orders of the Selangor State Legislative Assembly, this august House receives the Report of the Select Committee on Local Authorities (JPPBT) for the Selangor State Legislative Assembly regarding the flood disaster in December 2021 in the State of Selangor, which was tabled in this august House as Meeting Paper No. 7 of 2022.

Honourable Members, the Select Committee on Local Authorities has held closed-door hearings involving several local authorities (PBT). Among them were MBSA, MBPJ, the Irrigation and Drainage Department (JPS) was also involved, the Department of Meteorology, Majlis Perbandaran Kajang and also Subang Jaya. Members of the House, on 17 to 19 December last year, the State of Selangor was struck by a severe flood disaster that involved loss of life, damage and loss of property. The disaster occurred following extraordinary rainfall caused by continuous rain for nearly 3 consecutive days. And the phenomenon of a major high tide had a very critical impact, especially on residents in the districts of Petaling, Klang and Hulu Langat.

At the PBT meeting dated 10 January, the Committee agreed to examine in more detail all the problems that arose and to identify improvement methods that can be implemented to ensure that the State Government of Selangor is always prepared to face such a disaster. On 24 January, the Committee held a closed-door hearing involving all agencies and parties responsible for managing the disaster. To explain the constraints and challenges they faced before, during and after managing the flood disaster.

In the closed-door hearing, the Department of Meteorology Selangor Malaysia or MET Malaysia, the Committee took note that the climatic conditions during the December 2021 flood were unexpected, because based on analysis and models by MET Malaysia and in and outside the country, the majority of models showed that the monsoon wind system bringing heavy rain at that time would stop after entering the Straits of Malacca before going to the western part of the Peninsula and would enter Sumatra, and it was expected that the northern areas would be affected. However, this did not happen, and it caused continuous heavy rain in the West Coast area and monsoon flooding occurred.

However, MET Malaysia informed that there was one model that predicted the rain would continue, that is, the weather system would not stop. But it was not taken into account because the majority showed otherwise. MET Malaysia informed that the delay in issuing the continuous heavy rain warning on 17 December in Selangor, especially in the Klang Valley area, was because the forecast was made based entirely on weather model analysis. And it was not matched with the total rainfall at that time. MET Malaysia informed that normally in the State of Selangor, weather forecast warnings will be sent to the SMART Selangor C5i Operation Centre (SSOC).

The Committee also took note that warnings issued by MET Malaysia were staged, and rain in an area is difficult to forecast because cloud formation occurs in the atmosphere and it moves, causing rain forecasts to be unable to be issued specifically according to location and time.

Members of the House, I will, the paper is with all Members of the House. However, I will take some of the important matters from the Committee's findings, and among them is that the Committee also... MET Malaysia informed of the delay in issuing the continuous heavy rain warning on 17 December 2021 in the State of Selangor. Then the Selangor Irrigation and Drainage Department (JPS), the Committee took note of the status of the activation of sirens that was stated and was not verified against the actual situation on site. We also found that the number of flood areas involved was 195 flood areas. And the number of flood warning sirens activated was 50.

JPS informed that the capacity of the existing drainage system was designed to accommodate flows at a minimum return period of only 5 to 20 years. However, the rain that fell from 17 to 19 December showed flows at a return period exceeding 100 years, which cannot be accommodated by the existing drainage system at present. JPS also informed that it will increase the number of rainfall stations to ensure the accuracy of flow calculations at certain return periods.

JPS also informed regarding projects that have received approval and been granted land ownership for development projects. JPS is only responsible for ensuring that technical conditions are complied with. Among the structures of flood water management assets in Selangor are as follows. For example, 515 hydrological stations, 364 floodgate pumps, 111 mobile pumps, 49 pump houses, river houses including banks and embankments totalling 2,683 kilometres, and 132 retention ponds. The current status of maintenance of floodgates and pump houses, expected to be completed by the end of 2022, involves 122 floodgate units and 13 pump houses, involving a contract cost worth RM 2.5 million.

Members of the House, JPS has also submitted views and proposals to overcome floods in the future. Covering structural measures and non-structural measures. Among the proposed structural measures are flood retention projects, construction of embankments, construction of water retention ponds, and upgrading of the drainage system. Among the non-structural measures include, among others, PISMA, the Drainage Master Plan Study, the National Flood Warning Programme or PRAB. The proposal for restructuring the litigation of future floods in Selangor has also submitted details involving the SMART tunnel project and others.

The Committee has made several findings, among them that the Committee found that the Department of Meteorology submitted incomplete and inaccurate information when answering all questions raised by the Committee regarding the methods used in weather forecasting and communication systems, and inefficient and late issuance of warnings during the continuous rain that occurred in the State of Selangor.

Among the recommendations submitted by the Committee, among them, the Department of Meteorology or MET Malaysia urged the Committee to urge the State Government, through the Disaster Management Unit, to hold engagement with the Department of Meteorology to examine, among other things, a review of the work functions assigned to the Department of Meteorology following its failure to provide accurate statements and information during the closed-door hearing by the Select Committee on Local Authorities. The Irrigation and Drainage Department (JPS), among the Committee's recommendations, suggested that JPS draft a new policy relating to development projects and river and coastal reserves, especially in areas of green ecological zones, by studying policies adopted overseas as a guide.

The Committee recommends that JPS upgrade the existing siren system with the latest technology and establish a tiered warning system as well as the use of different siren sounds so that residents can act easily according to the information received.

The Committee urges the State Government to assist JPS in ensuring that the implementation of the flood forecasting and warning programme or PRAB in the State of Selangor can be accelerated before the stated period. The Committee also urges JPS to give priority to carrying out a review of the design of the existing drainage system and also flood mitigation systems, especially in existing flood mitigation areas that failed to cope with the recent flood disaster.

The Committee recommends that PBT control development on hill slopes, and along river and coastal reserves. The Committee is of the view that every Technical Department in the PBT and related agencies should make on-site detention (OSD) development in every building that will be approved. The Committee also urges the PBT to cooperate with the District Office to identify safer, suitable and comfortable locations that can be used as temporary relocation centres for flood victims. The Committee recommends that staff in every PBT be given flood disaster management training as an early preparedness measure. That concludes my speech, thank you.

Speaker

Silakan Semenyih.

Tuan Zakaria bin Hj HanafiUMNO · BNSemenyihEN

Thank you, Mr Speaker, Semenyih supports this report.

SpeakerEN

Honourable Members, this Motion has already been seconded. I open this Motion for debate, if any. Sijangkang, 5 minutes.

Thank you, Mr Speaker. Thank you to Kota Damansara for tabling this Motion, but I recall there are several matters I wish to mention. If I may refer to the narrative programme last week, what happened here was due to climate variability, and to say that it was caused by climate change would, I think, be too early. And I think this is what has happened, and I think it becomes a lesson for us. Only I see how management at the state level can be improved. I do not deny, as I have mentioned before, that there were discussions at the district level within the District Action Committee on preparations for facing the monsoon season, which I think was also a directive from the State Government, which I think was a normal preparatory step that we did not expect.

And I see, thank you to the responsible agencies in Kuala Langat, I think JPS has played a sufficiently good role today, as have JKR and also the PBT. Only some of what I mentioned the other day, there are several matters that we see need focused attention, perhaps not done in time, or perhaps due to funding constraints, which I think should be given attention hereafter to be resolved so that if a flood occurs, it will not be as big a flood as before, and it can be resolved.

I see that when this flood occurs, I am not sure whether perhaps the ADUNs were not involved, or the ADUN was not involved. I do not recall any discussion at the District Action Council level in addressing the flood that occurred previously. Only I recall that we were invited again to discuss the post-flood matters on 3 January 2022, which has just passed, to discuss post-flood matters. And I think the best thing would be that in management, several phases will take place, including discussing matters such as resettlement, needs, problems and so on. I think this should be done again, and I like to see at the State Government level, if we have a Disaster Unit at the State Government level chaired by the Dato' State Secretary. I think it should be strengthened, although perhaps people will say what is in a name, but I see that if the name is merely State Disaster Unit, it sometimes does not convey something grand, especially when we are managing this.

Perhaps it could be upgraded as a State Disaster Council that may exist at the district level. And also when we take action or discuss the problem of disasters or geo-disasters, ya, it can be engaged more broadly with various expert agencies and perhaps with universities, which I think will add a little value to professional management in the State of Selangor, which will ultimately benefit the people of the State of Selangor. Not only floods but also storms, landslides and so on, which we can strengthen from the management perspective. But it will have a good impact on the people. That is why I feel that whatever the name, it should not merely be a State Disaster Unit but something grander with better management and professional involvement, which will bring benefit to the state in the State of Selangor. Thank you, Mr Speaker.

SpeakerEN

Alright, Sijangkang. Sungai Burong.

Thank you, Mr Speaker, for giving Sungai Burong the opportunity to discuss the Report of the Select Committee on Local Authorities (JP-PBT) of the Selangor State Legislative Assembly (Dewan Negeri Selangor) concerning the flood disaster that occurred in December 2021 in the State of Selangor. Mr Speaker, I would like to draw attention to the opening report, which in essence has found many matters for further improvement and has also identified several weaknesses that need to be corrected again.

Although I agree with some of those views, I would like to draw attention in this paragraph that I find that the Local Authorities involved in the recent major flood were not asked to compile reports, or that their reports are not here.

What I mean is Majlis Perbandaran Kuala Selangor, because what we observe is that the major flood that occurred recently also affected several flood-prone areas in the district of Kuala Selangor, such as the areas of Kampung Parit Mahang, Kampung Bukit Kuching and then Berjuntai Bestari, which had many victims of the major flood. And so, although the conclusions from the findings of this report may have similarities in terms of solutions, or there are facilities to overcome it, there are some matters that I would like to highlight, with permission, in this report so that we also take care regarding the situation of the disasters that occurred in the district of Kuala Selangor that are not in this report. This matter can be further refined because we find that if this matter is overlooked or left behind in implementing plans and also development in the area.

I would like to focus especially on several areas involving two rivers, namely Sungai Buloh and Sungai Selangor. Sungai Buloh is a long river from Kuala Lumpur to its end at Kuala Selangor. And much development has taken place in this area. In the district of Kuala Selangor, under the administration of Majlis Perbandaran Kuala Selangor, there are also several development projects that are being implemented at this time. We see that several developer companies in Puncak Alam, in that development, have built large concrete drains which are then channelled into Sungai Buloh, and we know that Sungai Buloh in this downstream area, in terms of development projects to widen, deepen and also build embankments, is lacking or perhaps has not yet been given attention by some of the State Government. That is why I am very worried, yes, that if a major flood occurs, it will affect the Sungai Buloh area itself, which will have even worse effects on the settlements along Sungai Buloh, such as Kampung Bukit Kuching and Kampung Parit Mahang in the district of Kuala Selangor.

And although we understand that some Majlis Perbandaran Kuala Selangor did not impose conditions like those imposed by JPS on developers building those drains, I am very worried, yes, if the construction only reaches the intake for water in Sungai Buloh. I am very worried that in future, Sungai Buloh will also experience major flooding and, if not major flooding, flash floods that often occur during the monsoon rains.

The second matter is in Kuala Selangor, especially in the Berjuntai Bestari area, and I notice this may be related to sand extraction activities in that area, which have affected the flow of the river in Sungai Selangor, causing Kampung Bestari and several villages near Sungai Selangor to be affected by flooding as happened in the recent flood. So I propose that the same matter also be looked at by this report.

The next thing is that I would like to propose that at the level of the Local Authority, they also establish an agenda or a Flood Operations Room, considering that this flood is a continuing issue. Firstly, in a situation where we are experiencing the problem of global warming, the consequence is unpredictable weather conditions following extreme weather; we see very heavy rains that release so much water, causing impacts of development or negative impacts of development in those areas. So if these Local Authorities hold an agenda, they can discuss it as an action, as people say, preparing an umbrella before the rain. So what we can anticipate in certain conditions based on weather forecasts and also based on indicators, as people say, certain seasons like now, we know every afternoon the rain is very heavy, so this will have an effect on problems that will become worse if we do not plan and implement early action. So that is all from me, thank you.

SpeakerEN

Thank you, Sungai Burong. Ijok, 5 minutes.

Just briefly, thank you, Mr Speaker. We have learnt lessons from the flood, but what Ijok is worried about now is the cooperation and communication between all the agencies involved in drainage and flood management. Sometimes they do not agree, so Ijok suggests that, if possible, all agencies determine who is responsible for the existing water drains. There is a problem where sometimes during floods, JPS says this is not mine, this is JKR's. JKR says this is not mine, this is the PBT's. They keep blaming one another, and that is why sometimes, in terms of implementation to repair water drains in the villages, there is especially a shortage. Sometimes this is because there are many drains and rivers that are sometimes not maintained properly. Many times when I go down to the ground, there is one Kampung Harmoni flooded, yes, next to Kampung Harmoni. When I went there, the JPS people said this drain is mine, but when it reached the main road, the problem was that the water did not flow, and this is not mine, this is JKR's. I hope the State Government will coordinate the management of these water drains. The victims are the local residents, the ADUN concerned. Thank you very much.

SpeakerEN

Thank you, Ijok. Let us ask the Government or whether there is any response regarding the said Motion.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Member. Thank you for the report that has been submitted, which I believe forms a large part of our debate in this House on these matters. However, specifically, as presented by Kota Damansara, it proves that the structure that has existed at the State level already exists. The question is at what level of readiness. If I may repeat a little, our readiness is for the level of 5,000 to 7,000 victims. But when it happens, it reaches tens of thousands and reaches hundreds of thousands of victims. That is why within the very critical 24 hours from the 17th to the 18th, several immediate decisions were made and failed to accommodate the increase in the very large and very severe number of victims.

Regarding the proposal from Sijangkang, the Selangor State Disaster Unit has indeed functioned very well, especially when facing several disasters. In fact, for disasters on a small scale, for example landslides in certain localities, the Disaster Unit has been able to control them all this time, and what we need to do now is to strengthen the District Disaster Committees. What has happened is that the Disaster Committees only exist at the Committee level and there is no unit to carry out operations. Perhaps we can consider this, because when a large-scale event occurs, as happened on the 18th, 19th and 21st last month, we found that the Disaster Unit was unable to go to all localities. And strengthening the units at district level is very necessary, especially in terms of assets. That is why, after this latest incident, the State Government's directive is that the local authorities (PBT) purchase several assets that can be used quickly, which previously were only for helping recovery after a disaster had occurred.

But now we also want to quickly improve their capacity through training with Civil Defence (Pertahanan Awam), for example, and secondly, equipment and assets for the evacuation process. I also feel this will help the search and rescue, or SAR, or evacuation process that takes place at grassroots level, more quickly while waiting for larger assistance. What happened last time, as I mentioned, we were waiting for assets from Bentong, but Bentong was also cut off or disconnected from assets because of landslides and floods that also had an impact, because Pasukan 11 Bridge could not bring assets quickly on the 18th. So in that regard, I believe that in terms of its structure, the 20th MKN directive already has its structure (National Security Council (MKN)).

However, I believe the implementation process at district level needs to be improved to be prepared for a larger scale, not just ordinary scales, and

we are aware of a consensus that I think is accepted in this House, namely how the process of climate change and global warming will cause multiplying effects of disasters that we do not expect or do not anticipate. Honourable Members, I also welcome the proposal from Sijangkang, for example, that preparedness also involve Members of the State Assembly, especially in directing the pre-disaster or before-event process. What has happened has happened: a meeting on the 9th, the ninth month, October, and perhaps a briefing was held after that, but this is based on past experiences. This means from now on we must activate and remind everyone, including MPKK, including Council Members and so on, and place their level of readiness at certain times. What happened on the 17th and 18th: assets were elsewhere, personnel were elsewhere, personnel could not come at that time because their houses were flooded and communications were cut. Assets could not be brought because from Sungai Buloh it had become an island, it had already become an island. So among the proposals we discussed in the State Government Executive Council meeting and the Retreat is that we place those assets in certain safe places at district level, more localised, and our officers' level of readiness is also deployed in sufficient numbers during the monsoon season or expected disasters. This means that around the tenth, eleventh and twelfth months, that level of readiness or on-call ready must be prepared at any time, and we have no specific excuses because of delays or some confusion that arose on the 17th to 18th, which had a very great impact, and the heartbreaking number of casualties reached 25 victims in the State of Selangor Darul Ehsan as in the previous incident. But I think YB Izham can answer on infrastructure in detail.

SpeakerEN

Honourable Members, the question before this House is a Motion which reads: "Whereas, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this honourable House accepts the Report of the Select Committee on Local Authorities (JP-PBT) of the Selangor State Legislative Assembly on the Flood Disaster in December 2021 in the State of Selangor, which has been tabled in this honourable House as Meeting Paper No. 7 of 2022."

Honourable Members who agree, please say YES.

Honourable Members who do not agree, please say NO.

Agreed to.

Secretary of the HouseEN

The next Motion is Motion No. 2 of 2022, a Motion under Standing Order 76(5) by the Honourable Member for Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Mr Speaker and Honourable Members, I wish to move a Motion which reads as follows: "That, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this honourable House receives the Report of the Special Select Committee on Water Resource Management of the State of Selangor on the Project to Connect HORAS 600 to the Water Treatment Plant LRA SSP1, 2 and 3 and Rantau Panjang and the Off River Storage to the Semenyih LRA, which was tabled in this honourable House as Meeting Paper Number 8 of 2022." Mr Speaker and Honourable Members, HORAS 600 was built in 2014 but was only put into use on 31 October last year. Why did the connection process take such a long time, seven years? This is because the proposed cost of connecting HORAS 600 was too high. Pandamaran will touch on the proposed connection cost below. According to Air Selangor, the cost of connecting to the Water Treatment Plant was discussed informally at early-stage meetings between the agencies together with the former Menteri Besar of Selangor, Tan Sri Khalid Ibrahim. These discussions were not continued and were not studied in depth, and were not formally presented to the State Government at that time, because the existing cost of the HORAS 600 discussions, with the design connecting the Selangor River, was too high.

Mr Speaker and Honourable Members, do you know what the connection cost was at that time? Let Pandamaran tell you. According to the initial study, the connection cost was as high as RM 763 million. The cost was far too high. According to Air Selangor, this cost estimate was based on a desktop analysis, with permission, and it was never formally presented to the State Government. After the hearings, the Selangor Water Resources Select Committee was of the view that there was a need to examine this issue. HORAS 600 could have been implemented at a reasonable cost, with a design that did not require complicated pipe engineering, but it was not implemented at the early stage because of financial and engineering issues. Mr Speaker and all Honourable Members, HORAS 600 and the Off River Storage are important for facing the dry season and water pollution. According to the National Water Research Institute of Malaysia (NAHRIM), the State of Selangor will experience a dry season in 2025. That is three years from now. Therefore, the committee is of the view that there is a need to accelerate the connection of HORAS 600 to the Water Treatment Plant. Thank God, this connection was successfully linked to the Treatment Plant on 31 August last year. Pandamaran would like to thank the Honourable Dato' Menteri Besar and Air Selangor.

Mr Speaker and all Honourable Members, apart from facing the dry season, the committee is also of the view that HORAS 600 and the Off River Storage need to be connected so that the water resources within them can be used as an emergency supply, as was previously proposed through Paper No. 7/2012, Report (JPK-SAS), on the post-mortem of water quality in Semenyih. Mr Speaker and Honourable Members, the committee was shocked during the 2021 Budget Session when the Honourable Dato' Menteri Besar informed the House that the State Government would implement a project to pump raw water from the HORAS 600 reservoir on the Selangor River and the reservoir on the Semenyih River at a total cost of only RM 200 million. The cost is very different, so significantly different. The difference is RM 563 million, which is not a small amount. If Air Selangor could have provided such an estimate at the early stage, the connection of HORAS 600 could have been implemented earlier, and unscheduled water supply disruptions could have been avoided in 2018, 2019 and 2020. Mr Speaker and Honourable Members, the following are the committee's targets.

1. The State Government must also always take a long-term view in examining and managing water resources in Selangor comprehensively. On the matter of water pollution, the State Government should carry out risk assessments, current and future pollution assessments, in accordance with development forecasts that will take place upstream. Proper action planning must be done now; do not act only after it is too late.

2. The committee hopes that the State Government will learn from this experience. In situations where there are cost or design challenges for any project, the State Government or the agencies concerned should obtain advice or proposals from other consultants to verify the initial advice or proposals.

3. The committee proposes that the State Government ensure that the LRA to be built is equipped with emergency water source facilities, and for LRAs not yet equipped with emergency water source facilities, the State Government must build such facilities. Emergency water source facilities must be taken into account in the design from the early stage for new LRAs.

4. The committee recommends that a study be carried out to connect the existing reservoir to the nearest LRA, so that the LRA has an emergency water supply if it does not already have one.

5. The committee wishes to emphasise the need to make the HORAS 600 connection project to LRA SSP1, 2 and 3 a success in the shortest possible time without compromising the quality of work. Therefore, the committee recommends that all agencies that may be involved in this project, including UPEN, Air Selangor, LUAS, SPAN, MPSB and MPKS, be involved at the early stage to expedite the implementation process. Pandamaran sincerely hopes that the State Government can take the committee's recommendations seriously and give them due consideration. Finally, Pandamaran would like to propose the Report of the Special Select Committee on Water Resource Management of the State of Selangor.

That is all, thank you.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Honourable Mr Speaker, I second the Motion.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

Honourable Speaker.

SpeakerEN

Honourable Members all, this Motion has now been seconded. I open this Motion for debate, if there are any. There are none, is that right? There is no debate, is that right?

Tuan Harumaini bin Haji OmarBERSATU · PHBatang Kali

Tuan Speaker.

Speaker

Hendak bahas?

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

Not "bahas" (debate), perhaps a typing error; here it says 5.4, but what he read out just now was 5.5.

SpeakerEN

What's the problem? There's no problem, is there, all right. Don't go looking for trouble, okay. I open the floor to all Honourable Members if they wish to debate; if not, okay, good. Honourable Members, the matter before this House is a Motion which reads: "That, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this honourable House receives the Report of the Special Select Committee on Water Resource Management of the State of Selangor (Special Select Comittee On Water Resource Management Of The State Of Selangor) (JPK-SAS) on the Project to Connect HORAS 600 to the Water Treatment Plant LRA SSP1, 2 and P3 and Rantau Panjang and the Off River Storage to the Semenyih LRA, which was tabled in this honourable House as Meeting Paper Number 8 of 2022."

Honourable Members who agree, please say so. AYE.

Honourable Members who do not agree, please say so. NO.

This Motion is Agreed to.

Secretary of the HouseEN

The next Motion is Motion No. 3 of 2022, a Motion under Standing Order 76(5), by the Honourable Member for Subang Jaya.

Speaker

Silakan.

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Mr Speaker and Honourable Members, I wish to move a Motion which reads as follows: "That, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this honourable House receives the Report of the Special Select Committee on Water Resource Management of the State of Selangor (Special Select Comittee On Water Resource Management Of The State Of Selangor) on the Development Project of the Sungai Rasau Water Treatment Plant, which was tabled in this honourable House as Meeting Paper Number 9 of 2022." Mr Speaker and Honourable Members, the Sungai Rasau Water Treatment Plant is a very important infrastructure project. It has two roles:-

1. To increase the water supply reserve in Klang from 1.9% to 20.9%. This matter is very important, especially considering that when water pollution occurs and the Water Treatment Plant concerned has to stop operating, the Klang district is the last area to receive water.

2. To reduce the risk of water supply disruption in the Klang Valley caused by treatment stoppages at SSP1, 2 and 3. This is for Phase 1 of the Sungai Rasau Water Treatment Plant. When Phase 2 is developed, both of these roles will also arise in the Petaling district.

Among the special features of the Sungai Rasau Water Treatment Plant are the following:-1. It uses the Off River Storage concept, which can control water quality. Such a system is needed because the Sungai Rasau Water Treatment Plant is located downstream and not upstream like other water treatment plants.

2. The Sungai Rasau Water Treatment Plant also uses ozone, which will help in odour filtration. This matter is very important because it will increase the resilience of the Sungai Rasau water treatment plant against pollution. This project is expected to be completed in 2024. However, the Selangor Water Resources Committee observed that there is a possibility of delay, even though this project is currently at an early stage. This is because the Sungai Rasau Water Treatment Plant is subject to source works, for which UPEN, the Selangor State Government, has applied for a grant of RM 1.3 billion from the Federal Government. To date, we have been informed that there has been no official response from the Federal Government regarding the approval of that application.

Honourable Members all, if the source works are not carried out according to the timeline and in line with the development of the Sungai Rasau water treatment plant, it will not be completed in 2024, and these source works should have begun in July this year. Therefore, the Selangor Water Select Committee recommends that the State Government obtain certainty and commitment from the Federal Government regarding the source works grant applied for, as soon as possible. Here Subang Jaya would like to add that the Sungai Rasau water treatment plant will play a very important role when the dry season forecast by NAHRIM occurs in 2025. Therefore, it is essential for us to obtain certainty and commitment from the Federal Government regarding the source works grant issue.

In addition, the committee also wishes to propose the following matters as improvements to the more comprehensive planning of the Sungai Rasau water treatment plant.

1. The frequency of meetings of the Sungai Rasau Water Scheme Development Implementation Monitoring Committee should be increased to a more optimal rate in order to strengthen coordination between agencies, to ensure the smooth development of a more integrated Sungai Rasau water treatment plant that adheres to the planned timeline.

2. The committee also proposes that the State Government begin discussions with the owners of telemetry stations located along the Klang River to establish agreement on data sharing to monitor water quality, in an effort to curb pollution and on the actions to be taken when pollution occurs. In addition, and given the density of activities along the Klang River that increase the possibility of pollution, the committee also proposes that the State Government begin planning stricter enforcement and pollution monitoring that can be implemented as soon as the Sungai Rasau water treatment plant is completed.

Finally, the committee also recommends that the State Government immediately carry out the process of gazetting the Sungai Rasau development project as a Prohibited Area and Prohibited Place under the Prohibited Areas and Prohibited Places Act 1959, submitted to the National Security Council (MKN), following the application for gazettement which has taken a long time, in line with the recommendation of the Report of the Selangor Special Select Committee on Water Resources, Paper No. 35 of 2021, tabled previously.

With that, Mr Speaker, Subang Jaya respectfully seeks to second the Motion.

Speaker

Baik.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Mr Speaker, I second the Motion.

SpeakerEN

Honourable Members all, this Motion has also been seconded. I open this Motion for debate, if there are any. Yes, Sijangkang.

Thank you, Mr Speaker. I wish to contribute, to debate and to give my views as a member of the Selangor State Special Select Committee on Water. But first I want to congratulate the State Government for deciding to build another water treatment plant, the Sungai Rasau Water Treatment Plant, to address the water supply needs in the Klang Valley, especially Klang and Petaling Jaya. However, I want to mention here several matters that I think the State Government must take seriously, because we know that the water source to be taken is from the Klang River, which today is in Class 3, if I am not mistaken. It must be ensured that this water source is good and not polluted, because, as mentioned earlier, it is also exposed to pollution that will occur. I also see, apart from pollution sources from the river, from factories and so on, that the concept of zero discharge, which the State Government will also emphasise, must also be taken seriously, especially the sewerage system. We find that in the State of Selangor there are still sewerage systems, especially in old housing areas, that use individual septic tanks, which eventually overflow and enter the drainage system. We hope that if there are any along the Klang River corridor, they must be dealt with first, perhaps by being desludged or replaced with an integrated system and so on.

The second matter concerns the intake point, or the water source to be extracted in the Klang River area here, at Kampung Lombong, near Kampung Lombong, near Kampung Bukit Lanchong, Jaya Sepakat. This is a river area that has a diverted course and is exposed to flooding. It can be said that every time the monsoon season arrives, there is always flooding in this area, and of course in the last flood it had a very large impact in this area. But perhaps there is one difference: it is quite extreme. When it is normal, we can simply cross this river to the other side, but when there is heavy rain it floods. Of course, I believe that at this intake point a barrage or perhaps dams will be built to pump or dam the water for extraction, and I think that the study based on the frequent flooding and the major flood that occurred today will be taken into consideration so that, in the end, it will not cause problems for the local community or the nearby villages.

I think this is the latest approach: the Government extracts water from the river, then stores it in a lake and it will be treated at the water treatment plant. However, this treatment plant is located in the Kuala Langat district, facing Rimbayu, and it does not focus on the Kuala Langat area, although I understand that in Kuala Langat we already have the Labohan Dagang treatment plant, and we have a balancing pond at Bukit Jugra that will address the water problem in Kuala Langat. And even now, when there is a temporary interconnection, it is very helpful, but I see that for the long term, if there is development in Pulau Carey, for example, it will also require a large volume of water. I believe there will certainly be a balance when there is a need in Kuala Langat, and it can be channelled there too. But this also needs to be considered, because I see that Klang Valley II, or Kuala Langat, is expected to develop rapidly, and of course the water demand here will also be quite large.

So I think those are among several considerations that must be looked at. I also see that the sand mining pit ponds at Jugra belong to IJM. Perhaps the State Government can look into this, as I said the other day, there are 2 ponds. One pond is empty; when floodwater breaks into pond one and flows into pond two, it eventually causes landslides and the water flow becomes one very large connection. If possible, perhaps the State Government should take over these as well, because these mines are not involved in the raw water supply system that will be developed for the Sungai Rasau water treatment plant. So this may be something the State Government can look at, in terms of how these mines can also be involved as raw water sources in the development of the Sungai Rasau water treatment plant. Thank you.

SpeakerEN

All right, I invite the Government side.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Speaker, and Honourable Members who debated the Motion on the Development of the Sungai Rasau Water Treatment Plant, which is one of the most important projects for water supply, our water supply system. For the information of Honourable Members, the project is already under way, and this project is estimated to be worth almost RM 4 billion, including the source works or upstream works, namely supplying raw water to this treatment plant. For this first phase, its capacity is 700 million litres a day. The tender contract has already been awarded and the work has already started. However, the upstream works to supply water through a system of ponds, about 13 or 14 ponds connected in series, which we have adopted as a new policy. Previously we took water directly from the river, but because of the new approach we found that if we take directly from the river and pollution occurs, we cannot control the quality of the raw water. That is why the current system is that all treatment plant developments will go through the pond system first, so that we can carry out initial treatment and ensure there is no pollution before it enters the treatment plant.

So for this, I thank the Honourable Subang Jaya and also Sijangkang for giving sound, good views, and we have examined everything in terms of its technology too. This use, for the first time, we are using an ozonation system. Ozonation is a modern, latest method that can solve odour pollution problems, but its cost is very high. Therefore, if we, if we look after the quality of the raw water that enters, we do not need to use this ozone; it is an option there. Only if necessary, because the cost for electricity and so on is very high. And for everyone's information, in one year Pengurusan Air Selangor spends almost RM 300 million on electricity supply alone, RM300 million for all its treatment plants, and also about RM 100 million more for chemicals, chemical substances for water treatment. If we can look after our water quality, this cost can be reduced, the electricity cost can fall, the chemical cost can also be reduced, and this will further help to expand

further Air Selangor projects to strengthen them, and indeed the long-term plan for the system is water management, although it may seem as if it is only for Klang or Labohan Dagang, this one for Kuala Langat. In fact, Labohan Dagang also has a phase 2 coming. It is still there, yes, but we cannot see it, so that the water supply at this treatment plant is used only in certain districts. For this system to be good, it must have a loop system, just like Tenaga Nasional: if we fail at one place, water will be supplied through another route to the same place to help. This system is indeed in the plan, but it requires a large expenditure and takes time. That is also being developed in stages by Air Selangor.

And secondly, we must remember that in terms of our reserve net margin, our reserve net margin is very small. Now it has only risen to 10%; previously, last year, it was below 3%. Because of that, we need to increase our treatment plants first, with Rasau, with Labohan Dagangan phase 2 and Langat. Langat is 1130 mld, but because its pipe system is not finished, we are only using 320 mld. So, the station is finished, the treatment is finished, but the pipes are not finished. We cannot distribute the water. So all of this is taken into account in development, and I will ensure that Selangor's water supply is the best and meets the wishes and needs of the state of Selangor for a long period into the long future. Thank you.

SpeakerEN

Alright, thank you, Honourable EXCO Pandan Indah.

Honourable Members, the question before this House is a Motion which reads that se nya, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Assembly, this august House accepts the Report of the Special Select Committee On Water Resources Management of the State of Selangor on the development of the Sungai Rasau water treatment plant project, which was tabled in this august House as Meeting Paper No. 9 of 2022.

Honourable Members who agree, please say yes. Yes.

Honourable Members who do not agree, please say no. No.

Agreed.

Secretary of the HouseEN

The next Motion, Motion No. 4 of 2022. Motion under Standing Order 76 (5) by the Honourable Sentosa.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Mr Speaker and Honourable Members, I wish to move a Motion which reads as follows: that, pursuant to Standing Order 76 (5) of the Standing Orders of the Selangor State Assembly,

this august House accepts the Report of the Special Select Committee on Water Resources Management of the State of Selangor (Special Select Committee And Water Resources Management Of The State of Selangor) on the state government's preparedness for the dry season in 2025, which was tabled in this august House as Meeting Paper No. 9 of 2022.

Honourable Mr Speaker, the Special Select Committee on Water Resources Management held a closed hearing on 25 January on the state government's preparedness for the dry season in 2025. The agencies involved in this meeting were Air Selangor, the Selangor Water Management Board (LUAS), the Macro and Privatisation Section of the State Economic Planning Unit, the Selangor State Department of Mineral and Geoscience Malaysia, the Malaysian Meteorological Department (Met Malaysia), the Disaster Management Unit, and the Selangor State Irrigation and Drainage Department (JPS). The members of our Committee are chaired by the Honourable Subang Jaya, the Honourable Pandamaran, the Honourable Meru, the Honourable Sijangkang, the Honourable Kota Anggerik and the Honourable Batang Kali. A little background on the meeting that was held: our Committee agreed to examine the drought issue because there were forecasts of a serious dry season that would occur in Malaysia between 2025 and 2035. The forecast is part of the results of a forecasting study conducted by the National Hydraulic Research Institute of Malaysia (NAHRIM) together with the Malaysian Administrative Modernisation and Management Planning Unit (MAMPU), using a big data method capable of forecasting climate change between 90 and 100 years ahead, and also the forecast from the assessment report made by the climate change panel between the Government and the IPCC.

Some facts that were contributed and provided by Air Selangor: Air Selangor informed us that the projections stated by the NAHRIM research institute are overall and there is no projection by river basin. Therefore, more detailed data and information from NAHRIM on drought forecasts are needed in order to make a more accurate estimate of the impact of drought situations on the water supply system in Selangor. As a result of prolonged and large-scale reduction in rainfall, river levels will decline and reduce the river's base flow. Dam levels will decline and will disrupt the raw water sources for the related plants. Therefore, large-scale water supply disruption is expected if the reduction in rainfall distribution occurs simultaneously in all river basins.

Honourable Mr Speaker, Air Selangor is also of the view that the issue of the government's preparedness and readiness in tackling the drought disaster requires coordination among all government agencies, especially the National Water Services Commission (SPAN), which has legal authority to draft plans and strategies

for mitigation on a scale based on the level of seriousness to be implemented by the relevant agencies according to their respective jurisdictions. Air Selangor is also of the view that there is a need to seek alternative water sources such as sea water, rainwater and also groundwater for the purpose of increasing water reserves and preparation for facing this dry season. As for LUAS, they have given us or informed us that in 2009, 20 ponds and mining pits were gazetted under Section 44 of the LUAS Enactment 1999 as protection zones and can be used as alternative water sources to reduce dependence on dams. The total capacity of the 20 ponds is 297,820 million litres a day, which can last 99 days, taking into account or calculating an output of 3,000 million litres a day.

Honourable Mr Speaker, the findings of the Committee according to Met Malaysia and JPS, the Committee observes, that a more accurate drought forecast can only be given two (2) to six (6) months earlier with only 60% accuracy. That period is not sufficient for early preparation for a prolonged dry season, which requires the building of additional infrastructure such as, for example, floodgates, permanent pumps, pipes, wells and other systems such as underground treatment systems and so on. Therefore, Mr Speaker, the Committee's recommendation is that, given that an accurate weather forecast can only be provided between two (2) and six (6) months ahead, the Committee urges the State Government to act immediately by setting up an Action Committee involving all relevant agencies to:

1. Learn from and overcome the problems faced in tackling the 2014 drought.

2. Collect and supply comprehensive and more detailed data so that mitigation for facing drought can be carried out more accurately and thoroughly.

3. Study in detail underground water sources, lakes and mines that can be used as alternative sources for facing a prolonged drought.

4. Identify the additional infrastructure and allocations needed to face a prolonged drought.

5. Establish Special SOPs between agencies according to the level of seriousness, from moderate to dangerous, to face the forecast drought.

6. Establish a more comprehensive and effective communication system to the public regarding the appropriate actions to be taken according to that level of seriousness.

7. Set KPIs for Drought Preparedness Achievement for each agency and stakeholder that must be achieved before 2025 and hold regular meetings to monitor the progress of that achievement.

Mr Speaker, the Committee also recommends that the State Government examine in more detail the process of seawater extraction or desalination, large-scale rainwater harvesting, well systems and related treatment systems, and also, in accordance with the advice of His Royal Highness, seek the latest technology to be used as one of the emergency preparedness sources. Mr Speaker, I would like to remind that in 2010 a study was carried out by the State Government trying to use one technology, namely using mobile units to produce water, yes, from rivers or ponds with membrane systems to produce R.O. water and so on. The Committee recommends that the State Government study the use of underground water sources to be supplied to the public, private and industrial communities, given that not all underground water sources have sufficient capacity to be channelled to water treatment plants.

Finally, Mr Speaker, the Committee suggests that the State Government implement efforts to connect water sources, underground water at Sungai Selisek, to be channelled directly to the Water Treatment Plant given the high water capacity. Mr Speaker, the Committee also recommends that the State Government expedite Libat Urus (engagement) with landowners and water quality studies for water ponds, lakes and also old mines that are under private ownership, to obtain agreement to use their water sources as alternative sources, especially during emergencies. With this, Sentosa thanks you, Sentosa requests to propose. Thank you.

Speaker

Baik

Tuan Mohd Najwan bin HalimiPKR · PHKota AnggerikEN

Mr Speaker, Kota Anggerik requests to second.

SpeakerEN

Alright, thank you, Kota Anggerik. I open to Honourable Members: this Motion has already been seconded, and I open this Motion for debate.

Honourable Mr Speaker, I...

SpeakerEN

Honourable Taman Medan, what is it?

Not to debate, perhaps there is a wish to correct a term, "penuaian hujan" (rainwater harvesting); I think "pembenihan hujan" (cloud seeding) is more suitable. It is in there.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Different, that is different.

Alright, thank you.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Indeed it is rain harvesting; harvesting is connected, it is "penuaian", lah.

SpeakerEN

Alright, Honourable Members, the question before this House is a motion which reads that, pursuant to Standing Order 76 (5) of the Standing Orders of the Selangor State Assembly, this august House accepts the Report of the Special Select Committee on Water Management of the State of Selangor (Special Select Committee And Water Resources Management Of The State of Selangor), JPKSAS, on the state government's preparedness for the dry season in 2025, which was tabled in this august House as Meeting Paper No. 9 of 2022.

Honourable Members who agree, please say yes. Yes.

Honourable Members who do not agree, please say no. No.

Agreed.

Secretary of the HouseEN

The next Motion, Motion No. 5 of 2022, Motion under Standing Order 76 (5) by the Honourable Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Mr Speaker and Honourable Members, I wish to move a Motion which reads as follows: that, pursuant to Standing Order 76 (5) of the Standing Orders of the Selangor State Assembly, this august House accepts the Report of the Standing Orders Committee of the Selangor State Assembly, which was tabled in this august House as Meeting Paper No. 11 of 2022. Mr Speaker and Honourable Members, 2020 was a disappointing and worrying year for everyone. Many countries were threatened by the Covid-19 virus. Malaysia was not exempt. The Malaysian Government had to implement the Movement Control Order, so the sittings of the Selangor State Assembly were also affected and could not hold the meetings that had been scheduled in person. Many matters needed to be discussed, brought and debated in the House, but the Selangor State Government was not permitted to meet in person. Therefore, the Committee is of the view that there is a need to amend the Standing Orders to allow meetings online or hybrid when facing emergencies,

pandemics or unforeseen emergencies that are very harmful, where personal attendance is not permitted. Selangor will be the first State to amend the Standing Orders in Malaysia, yes, and Parliament has not yet made such an amendment. The people of Selangor should feel proud and happy because we are the most advanced and far-sighted State. Therefore, Pandamaran requests this proposal, thank you.

Speaker

Silakan.

Mr Speaker, Sungai Burong seconds.

SpeakerEN

Thank you, Sungai Burong. Honourable Members, this Motion has also been seconded. I open this Motion for debate if there is any. Taman Medan, what is it?

Once again, Mr Speaker, I request a correction to the sentence: it should be "Negeri Selangor tidak terkecuali" (Selangor is not exempt), not "tidak berkecuali", please note. Thank you.

SpeakerEN

Yes, Honourable Pandamaran, "tidak terkecuali", yes, "terkecuali" is correct, the sentence is correct, yes. Alright, there is a Language Council (Dewan Bahasa) here this morning, yes. Alright, Sijangkang.

Thank you, Mr Speaker.

SpeakerEN

Five (5) minutes.

Thank you, Mr Speaker. Congratulations to this Motion brought to address the issues we face, yes, especially during the recent Covid-19 when we could not hold sittings of the House. However, I also want an explanation from the State Government: when we hold online meetings, must they be held at certain specific places that are gazetted as places that can be said to be, such as this State Legislative Assembly, which is gazetted as the place where we sit, whether when we are online, whether at home or at a Community Service Centre or any venue, whether it needs to be gazetted from the legal point of view, or how. Thank you.

SpeakerEN

Alright, please proceed, Pelabuhan Klang.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable Mr Speaker, I support the Motion brought by Pandamaran to allow State Assembly Members to join State Assembly sittings if they contract Covid-19. But, Honourable Mr Speaker, Pelabuhan Klang would like to suggest that it must be ensured that they really have contracted Covid-19, and there must be a mechanism, we do not want that later someone does not get Covid-19 but takes advantage of the Motion that has been passed to allow State Assembly Members to attend the House sitting online. We do not want that later the afternoon shift, the morning cannot come, they say they have Covid-19. Then they ask for questions to be answered and they can also join in this. So that is why Pelabuhan Klang supports online sittings, but it must truly be a case of being forced, only then do we hold this State Assembly sitting online. If not, we continue these online sittings as normal. What does Taman Templer say? Pelabuhan Klang supports.

SpeakerEN

Alright, Pelabuhan Klang. Okay, please proceed. Is there any other? No? Please proceed. Anyone else? Is there a response from Pandamaran?

Tuan Leong Tuck CheeDAP · PHPandamaranEN

For Sijangkang's information, okay, under the addition to Standing Order 73(15), we refer to page 3 here, okay.

"If in a state of emergency, a pandemic or an extraordinary emergency that is very detrimental where personal attendance should not be held, select committee meetings held online in their entirety or partially online are subject to the permission of the Speaker with the prescribed procedure."

So, this is under the power of the Speaker, where the conditions must have been set, and everyone attending online or partially online must follow the procedure set by the Speaker.

SpeakerEN

Alright, does the Government side want to give anything? No, there isn't. Please proceed.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Speaker. We passed this Motion in the previous sitting and it went through the hearing process by the Committee concerned, and the Committee has considered several matters and details. And I believe this is an evolutionary process, where in future we may need to set out what was raised by Pelabuhan Klang, and some feedback has been given by Pandamaran as Chairman or in the Committee concerned. Among the concerns from the Legal Adviser is that we set out in detail, or precisely, okay, which matters may or may not permit a hybrid sitting online to be carried out. However, in the Committee's view at the current stage, it is sufficient for the Speaker's Petua or the Speaker's view to set this, but I believe this House can still examine these questions in the future. Because this is a new matter, yes, this is a new situation we have faced, the pandemic has taught us and we evaluate it, or we re-evaluate it, so that sittings can still be held. It has good experience, among them different experiences. Recently the pandemic, and recently there were also floods. Let us say the floods were very massive, we would still need to hold a sitting to appoint a Speaker, or to determine the cabinet or so on, for example, okay, so we can still hold it based on the summons of the Speaker, the State Assembly Speaker who feels that after examining several questions it is carried out. Imagine that during that great flood we would still need to hold a sitting, for example. We can organise it, and Honourable Members can be at home or at certain centres to hold it. However, the concern that has been, or the care that has been raised by Pelabuhan Klang is quite true and valid. However, I believe after going through several processes, we still have not considered or included it in Schedule C, okay, where we set it precisely, one, two, three, four, but this is a new matter, and from time to time I feel we are open to amending it again or adding to it again, improving it, but at this level I believe we have opened a space for a mechanism and also a new paradigm of Sittings that can be organised online. And this is not a foreign matter, because in other places in the world we find they also hold sittings online, and we do not disrupt our duties, or the determination, and also our responsibility as Members of the House to carry out, even in emergency conditions and so on. So, Honourable Member, I thank the Members of the House. Please.

Speaker

Sijangkang?

Only in my view, it is better that this venue be a venue under the control of the State Government or under the authority of the State Government, because it makes it easier from the perspective of decisions at the Speaker's office level, and I also see that when we hold this, perhaps in this way, the concession previously, if we made decisions there were physical votes, and this can also be seen when we vote virtually, that is also recognised as a physical vote. By seeing that the venue is a government venue that has authority, I think that is better. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Sijangkang. I think that matter can also be decided or ruled by the Speaker, which, if possible, we consider so that the venues can be set, the venues can be determined, and the Speaker can propose or suggest those venues. For example, we can set them at the District and Land Office or at the Local Authority, because at the same time we also need to guarantee access and also a consistent source of connectivity or internet connection. If it is organised at home, right, then there will be the sound of children, the sound of mothers, the sound of a pestle, the sound of mothers, the sound of mothers, the sound of children, and the sitting cannot proceed. So I too believe we can take that into consideration, and the Speaker can be made to consider it, because the basis or purpose of it, the source of authority to summon or propose this online sitting, still rests with the power

Speaker. There is quite a wide openness, there is no detailed and precise examination as mentioned by the Legal Adviser in the proposal to the committee. However, I believe evolution needs to be carried out on this matter in the future. Let us just open this to open that option, but if the Speaker does not foresee anything or the Speaker makes a consideration that no online sitting or hybrid sitting needs to be held, then we must attend as usual. But if the Speaker feels it is very necessary to hold it at that time, when each of us is overseas and so on, there are important matters, so it can still be held.

It also depends on the Speaker, it is quite good too, sometimes at certain times we may be overseas, overseas. So if we are overseas, we only set government premises, so they have to look for another place. Perhaps an embassy can be set, for example, in the future. So this matter I think is still open to the discretion and also the consideration of the Speaker as the source of authority and the source of assessment for holding a hybrid sitting, but we are of the view that for the future, after going through some experiences, that is what I mentioned. Later we will go through it, and if we do not go through it we will get additions to ensure that the sitting and also the source of authority for the online sitting is decided in more precise rules or more written rules. Sometimes if it is too rigid it becomes a problem. Let us open first from this fairly open form, but after that from time to time we can still improve. Thank you.

SpeakerEN

Alright, thank you, the Most Honourable Sg Tua. For the information of Honourable Members, since we humans are small, always tested by Almighty God, calamities can come at any time. Now Covid, what will come next, who knows. Let us do good things to reduce calamities like this, and these Standing Orders are actually to be used only at the very last moment, okay, that is, only for unforeseen final disasters, that is, as the last option. Otherwise, physical sittings will be held. Yes, that is for information.

Honourable Members all, the matter before this House is a motion that reads:

"Whereas, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House receives the Report of the Standing Orders Committee of the Selangor State Legislative Assembly that has been tabled in this August House as Meeting Paper Number 11 of 2022."

Honourable Members who agree, please say yes. Yes.

Honourable Members who do not agree, please say no. No.

This Motion is Agreed.

Secretary of the HouseEN

Next motion. Motion No. 6 of 2022. Motion under Standing Order 26(1) by Y.B. Pelabuhan Klang.

SpeakerEN

Please, Pelabuhan Klang.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable Mr Speaker and all Honourable Members. Pelabuhan Klang wishes to bring a motion which reads as follows:

"Whereas, pursuant to Standing Order 26(1) of the Standing Orders of the Selangor State Legislative Assembly, this August House urges the Federal Government to provide financial allocation of RM100 thousand every year to cover maintenance work, resurfacing and repair of roads as well as road furniture, Federal roads leading to Pelabuhan Klang and its surroundings."

Honourable Members all, I bring this motion after discussing with the Honourable Meru, the Honourable Sentosa, the Honourable Pandamaran and also obtaining the views of the Honourable Banting.

Honourable Mr Speaker, as all of us are well aware, based on the report issued by the World Shipping Council in 2020, Pelabuhan Klang is the 12th busiest port in the world. That is based on ports; if based on countries, Pelabuhan Klang is the 6th busiest port in the world, because of those 12 busiest, 7 ports are from China, 1 from Singapore, 1 from South Korea, 1 from the Netherlands and 1 from the UAE. But Honourable Mr Speaker, if we look at Pelabuhan Klang, which is the 12th busiest in the world, yet if we look at the state of infrastructure or roads in Pelabuhan Klang, it does not reflect at all a port that is the 12th busiest in the world.

SpeakerEN

Which is the 11th?

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

The 11th is the UAE, UAE Jebel Ali, okay. Honourable Members all, the main problem in the Pelabuhan Klang area, which often draws public attention and which I have often raised in this August House, is the issue of maintenance problems, damage and cleaning, infrastructure, roads owned by the Federal Government. Every day my office receives various complaints and grievances from road users in Pelabuhan Klang. Among the grievances and complaints received are, firstly, the condition of the road surface is uneven and full of potholes even though the road was resurfaced at the end of 2020. Secondly, the lamp posts are there, but they are not lit. Ha, lamp... the lamp posts are there, but not lit. Okay, and thirdly, ha, this too is road marking, the road lines that are increasingly faded and some of them have completely no road lines, they have disappeared, as on Persiaran Raja Muda Musa. The fourth, this is also a problem that plagues road users in the Pelabuhan Klang area. What is it? Water pooling on the road during rain and after rain, the pooled water

SpeakerEN

Pelabuhan Klang, please sit down.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Alamak, it is still long, Honourable Mr Speaker.

SpeakerEN

Please sit down. Honourable Members all, the time has shown 1.00 in the afternoon, so I adjourn the House until 2.30 in the afternoon. The House is adjourned.

(THE HOUSE ADJOURNED)

(THE HOUSE RESUMED)

(MR SPEAKER IN THE CHAIR)

SpeakerEN

The House has resumed, I invite the Honourable Pelabuhan Klang to continue.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable Mr Speaker. Honourable Mr Speaker and Honourable Members all. Pelabuhan Klang wishes to bring a motion which reads as follows: that this August House urges the Federal Government to provide an allocation of RM 100 million every year to cover maintenance work, resurfacing and repair of roads as well as road furniture of Federal roads leading to Pelabuhan Klang and the Pelabuhan Klang area. Honourable Mr Speaker, as all of us are well aware, based on the report issued by the World Shipping Council in 2020, Pelabuhan Klang is a Pelabuhan Klang that is the 12th busiest port in the world. That is based on ports; if based on countries, Pelabuhan Klang is the 6th busiest port in the world located within the country of Malaysia. Because of those 12 busiest ports, 7 ports are from the country

China, one port in Singapore, one port in South Korea, one port in the Netherlands, one country, the United Arab Emirates, UAE.

SpeakerEN

Pelabuhan Klang. Pelabuhan Klang. Honourable Member, is this what you already read earlier?

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Earlier, I was correcting the Honourable Member's facts.

SpeakerEN

Ohh, this is what I thought was recycled earlier.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Haa, no, there isn't.

Speaker

Ha silakan.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

But if we look at the state of the infrastructure and roads in Port Klang, it does not directly reflect that Port Klang is the 12th busiest port in the world. Every day Port Klang receives complaints from residents and road users in the Port Klang area, especially about the maintenance and cleaning of the roads and road infrastructure owned by the Federal Government. Among the complaints and grievances received are the following. First, the road surface is uneven and full of potholes, even though it was resurfaced at the end of 2020. Second, there are no street lights, meaning the street lights are not on. The lamp posts are there, but the lamps do not light up. Third, the road markings, or the lines on the road, are fading, and some have disappeared altogether, such as at Persiaran Raja Muda Musa. Fourth, water pools on the road during and after rain. This endangers road users on motorcycles, because the water stays for a long time, causing inconvenience and posing a safety risk to road users, especially motorcyclists. Fifth, there is the problem of traffic lights that often break down due to theft and vandalism. Sixth, road furniture is damaged and missing, such as guard rails, and road signs have also disappeared due to theft and vandalism. Seventh, this one the Port Klang Office constantly receives complaints about: damage to bridge expansion joints that endangers road users. New bridge expansion joints also often break, where the cement laid in the joints often cracks. Just yesterday it happened again at the Pulau Indah Bridge. And eighth, the issue of road cleanliness. If the Honourable Mr Speaker comes to Port Klang, he can see road shoulders that are not swept and not cleaned, and fragments of trailer tyres scattered across the roads in Port Klang. The Federal Government should have provided, should have provided road sweepers to clean these roads. The grass is also not cut, and there is a lot of rubbish on the road shoulders.

Ninth, the sides of the road are sinking, caused by heavy vehicles parking on the road shoulders, which causes the road to sink on both sides. Tenth, the trees, ha, this one if you want to come and see, trees growing on the bridges, you can come to Port Klang. We can see wild trees growing on the bridges in Port Klang. This is natural landscape, and I do not know why these trees are being left to grow on the bridges in Port Klang. Eleventh, this is also a problem often raised by road users, namely the lack of directional road signs. If we want to go to KLIA, we see signs showing the way to KLIA, but if we want to go to Port Klang, there are no signs for the route to Port Klang, and if someone is driving at night and wants to head to Port Klang, for example, they will feel unsure whether they are going the right way to Port Klang because the road is dark, the lights are not on, and there are no road signs either. And there are other problems besides these. All these problems give rise to road safety issues for public vehicles, especially motorcyclists.

Many accidents that occur are caused by road damage, which results in damage to public vehicles and sometimes results in loss of life. For the information of Honourable Members, the total length of federal roads maintained by the Federal Government leading to Port Klang and roads within the Port Klang area is 167.43 km. Of the 167.43 km, 41.02 km has been maintained by developers because they are involved in construction work such as the MRT and also road upgrading works. Meanwhile, 126.41 km is maintained by JKR Klang through the concession company, namely Road Care Malaysia Sdn. Bhd. The 126.41 km of roads is divided into two categories: protocol roads totalling 94.19 km, while 32.22 km are main roads.

The roads involved are as follows. I will begin with the protocol roads. First, FT02, Pelabuhan Klang - Berkeley, 13.08 km long, from chainage 0.00 to chainage 10.50. Second, FT05, Jalan Klang - Banting, 12.86 km long, from chainage 422.60 to 433.10. Third, FT20, Jalan Pintasan Selat Klang Utara, 8.90 km long, from chainage 3.70 to chainage 11.70. Fourth, FT20, Jalan Pintasan Selat Kelang Utara, 0.73 km long, from chainage 14.30 to chainage 15.03. Fifth, FT0103, Jalan Pelabuhan Klang Utara, 4.8 km long, from chainage 0.00 to chainage 3.58. Sixth, FT103, Jalan Pelabuhan Klang Utara, 4.5 km long, from chainage 3.58 to chainage 4.8. Seventh, FT 180, Jalan Pelabuhan Utara-Barat, 5.5 km long, from chainage 0.00 to chainage 5.38.

Eighth, FT181, Lebuh Raya Pulau Indah, 18.3 km long, from chainage 1.40 to 19.10. Ninth, FT347, Jalan Lingkaran Pulau Indah Phase 1, 8.25 km long, from chainage 0.00 to chainage 6.70. Tenth, FT3217, Jalan Meru, 8.69 km long, from chainage 7 to chainage 1700. Eleventh, FT3217, Jalan Setia Alam, this is all the roads leading to Port Klang. 5.33 km long, from chainage 10.20 to chainage 11.40. Next, the twelfth, FT3217, Jalan Sirih. 0.55 km long, from chainage 17.00 to chainage 17.55. The thirteenth, the last protocol road, which is FT3218, Jalan Batu Unjur, 2.7 km long, from chainage 0.00 to chainage 2.70.

As for the main roads that have been gazetted by JKR, the first is FT02, Susur Selari, 14.4 km long, from chainage 0.00 to chainage 14.4. FT3217, Jalan Persiaran Hamzah Alang, 7 km long, from chainage 0.00 to chainage 7.00. Third, FT3218, Jalan Pandamaran, 4.5 km long, from chainage 0.00 to chainage 4.50. Fourth, FT3218, Jalan Kampung Pendama, 4.3 km long, from chainage 4.50 to chainage 8.80. Fifth, FT337, Jalan Stesen VSH Klang, 0.6 km long, from chainage 0.00 to chainage 0.60. Sixth, FT3220, Lebuh Sultan Abdul Samad, 1.42 km long, from chainage 0.00 to chainage 0.6.

All of these are roads owned by the Federal Government. They should be maintained by the Federal Government through JKR Klang and the concession company Road Care Malaysia. But because allocations are insufficient, these roads are not properly maintained and repaired. That is why these roads frequently become damaged. And for the information of

Honourable Mr Speaker, the number of vehicles using the roads in Port Klang is increasing day by day. Especially heavy vehicles, due to the brisk activity of import and export trade, and driven by the rapid growth of manufacturing and industrial activities in this country. According to the traffic impact study carried out by the Port Klang Authority, LPK, traffic flow in the Port Klang area and its surroundings has shown a very high increase every year. And this traffic flow is believed to continue increasing in the coming years, based on the trend of brisk economic activity in Malaysia. According to that study, in 2015, on average each day the total number of light and heavy vehicles using the Pulau Indah Highway was 62,422 vehicles a day, and this increased to 73,025 vehicles a day in 2019. And then to 78,948 vehicles a day in 2021. As for Jalan Kem, in 2015, on average each day 87,333 vehicles used the road, and the number continued to increase in 2019 to

102,167 vehicles a day. Then 110,504 vehicles a day in 2021, because this highway is two-tiered, Jalan Kem has a state road and a federal road, and that is its traffic flow. As for the Geran Bersepadu Highway, in 2015 the number of vehicles a day using the route was 50,114 vehicles, and this increased in 2019 to 58,661 vehicles a day. Then in 2021 the number of vehicles became 63,448 vehicles a day. In addition, for the road on the KESAS Highway, Taman Penama Indah, in 2015 the average traffic flow was 89,105 vehicles a day, and this increased to 104,240 vehicles a day in 2019. Then in 2021 the number of vehicles using the highway was 112,746 vehicles a day. The maximum capacity of the roads in Port Klang.

Honourable Members all, Honourable Mr Speaker, for your information, the maximum number of vehicles that the roads around Port Klang, most of which were built about 20 years ago, can accommodate is only around 40,000 vehicles a day. But based on what I have just read out, all these roads have exceeded their maximum capacity, and most of these roads are led by heavy vehicles, causing road damage. Most of the roads that were resurfaced at the end of 2020 have also only lasted a short time because of the very high volume of traffic or vehicles. Furthermore, most roads in Port Klang are past their lifespan and all of them need to be resurfaced. But whenever my side contacts the Public Works Department, we often receive the reply that there is no allocation, or that we must wait for an allocation to come down from the Federal Government, because my office was informed that federal roads do not have periodic allocations every year. They must be applied for based on road damage. So, Honourable Mr Speaker and Honourable Members all, among the factors behind the busy roads in the Port Klang area is the brisk growth in container import and export activity. As for the volume of import and export containers handled at Port Klang by Westport and Northport from 2019 to 2021, there has been an increase. For the import category at the port, the number of containers was 2,548,714 TEU in 2019, and then increased to 2,556,427 TEU in 2020. Meanwhile in 2021, the number of containers continued to increase to 2,681,386 TEU. For the export category, in 2019 the number of containers was 2,480,728 TEU, and in 2020 there was an increase to 2,564,794 TEU. In 2021 there was another increase, namely 2,651,608 TEU. For transshipment containers operating at Port Klang, in 2019 the number was 8,546,397 TEU, handled by Westport and Northport. In 2020 the number of transshipment containers was 8,123,202 TEU, where it fell slightly compared with the previous year due to the effects of the Covid-19 pandemic that hit the whole world. But in 2021 there was an increase again for the transshipment container category, namely

8,391,484 TEU.

This shows that the total volume of import, export and transshipment activity was 13,580,839 TEU in 2019, and 13,244,423 TEU in 2020. Meanwhile in 2021 that total increased to 13,724,460 TEU. This shows that there has been rapid development within the Port Klang area, but its infrastructure development has not kept pace with the development or with the brisk container activity operating at Port Klang.

And furthermore, whatever factors contribute to the damage to these roads, obviously when the containers handled require many container lorries, the number of lorries is large. And for the information of all Honourable Members, the report from the Port Klang Authority (PLK) shows that up to now the number of container lorry transport companies approved by the Land Public Transport Agency, APAD, to operate at Port Klang is 446 companies. The total number of container lorries, or prime movers, or container heads, is 11,625,000 units, and container trailers, just the trailers that carry the containers, number 40,491 units, and this is expected to increase in the future. Imagine if they all came out at the same time. What would happen to the roads, not counting other commercial vehicles such as tanker lorries, ordinary trailer lorries, fuel lorries, sand lorries, cargo lorries and other lorries. Not counting public vehicles and private vehicles. And this is what has contributed to the traffic congestion that increases every year around the Port Klang area. And then I would like to present what the effects are when traffic flow is this high. Accidents occur frequently. According to accident statistics provided by the headquarters of the South Klang District Police, IPD, the number of accidents around the Port Klang road was recorded as 1,470 accidents a year in 2020, and 1,414 accidents a year in 2021. These are the ones that were reported to the police, Honourable Mr Speaker. There are many accidents that are not reported to the police. This large number of accidents is very worrying for road users in Port Klang. We can see these road users' complaints on Facebook and other social media. The Honourable Minister of Transport once issued a statement published in the Berita Harian newspaper dated 14 October 2021 that Port Klang has been recognised as having the most efficient operations among the 22 largest ports in the world, and the most well-known throughout the world. Handling 131 ships a week on average, and taking only 1.7 days to process each ship compared with 1.3 days from 2017 to 2019 before the pandemic. This is the statement of the Honourable Minister of Transport, but I would like to inform the Honourable Minister of Transport that the state of road infrastructure in Port Klang is still far behind the recognition given by the Honourable Minister of Transport. This can be checked with the Honourable Member for Bandar Baru Klang. I think the Honourable Member for Bandar Baru Klang is more knowledgeable and skilled about ports around the world. Is

Port Klang really so efficient and able to compete with ports in the world, especially in terms of its infrastructure?

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

The Honourable Member for Pelabuhan Klang.

Speaker

Silakan, silakan.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker, perhaps what the Minister of Transport meant when describing and showing the figures that Port Klang is the most efficient port during the MCO pandemic period in 2020 is the movement of containers between ships and the port, and the port and ships. It does not involve roads. That may be so. If it involved roads, it certainly would not be possible. Thank you.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, the Honourable Bandar Baru Klang. I just want to add a little to what was meant, which is also concerning transshipment containers, because Port Klang is among the ports handling very rapid transshipment, especially involving vessel transfers. What is happening now is that Westport and Northport do not have bridges. Yes, barges are used, and ships are used, but it is slow. But when customers who need exports and imports want things done quickly, the roads are still used, which is why, if we look, the volume of transshipment at Port Klang exceeds 8,000,000 TEU a year. That is why the roads at Port Klang are led by container lorries carrying transshipment containers. So I hope that, based on the experience of the Honourable Bandar Baru Klang, who has visited every port in the world, that one day you will contest again as a Member of Parliament and, if possible, we will elevate Bandar Baru Klang to become Minister of Transport. How about it, do you agree? We want someone from Selangor after this. The reason is that only Selangor knows the activity; the Honourable Bandar Baru Klang knows how vibrant the activity in the state of Selangor is, especially in the Port Klang area.

So I have just presented some of the factors and facts that I want to propose today: why Port Klang wants to request an allocation of RM 100 million a year from the Federal Government to repair and maintain the roads and road furniture in Port Klang and the roads leading to Port Klang. This is because the revenue of the Federal Government generated by Port Klang is channelled directly to the Federal Government. I want to tell many people this, because netizens on social media comment that the State Government has a lot of money. Why not repair the roads in the Port Klang area and its surroundings? These roads are the responsibility of the Federal Government, and the State Government cannot repair these roads. But the roads I read about earlier are mostly damaged. Earlier, the Honourable Bandar Baru Klang also told me, while we were chatting over lunch, that if we want to see which roads are nice and which are not nice, the ones that are not nice are federal roads, and the nice ones are state roads. It is easy to see in housing estates. We manage the MARRIS allocation. How we managed to resurface roads in housing estates, there is no problem like what we experience with federal roads.

Okay, the revenue of the Federal Government. Honourable Members, the terminal operator tax paid to the Federal Government: Westport pays the Federal Government a terminal operator tax of RM 231,326,000.00 a year. Northport RM 52,620,000.00. These are the two big terminal operators at Port Klang paying tax to the Federal Government. Meanwhile, the total collection of duties by Port Klang Customs, import and export duties for the year 2021, is RM 11.1 billion. RM 11.1 billion, yes, Taman Templer. Even pressing a calculator is difficult, Taman Templer. How many zeros is that?

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

That calculator might explode. Ha, that calculator might explode.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

12 zeros. It is higher than the revenue of the State of Selangor. RM 11.1 billion collected by Port Klang Customs. Do you know that even the road to Port Klang Customs is damaged and cannot be repaired, yet Port Klang Customs collects RM 11.1 billion? So Port Klang wishes to request through this august House from the Federal Government, through the Ministry of Finance, the Ministry of Transport and the Ministry of Works, to provide an allocation of RM 100 million every year. Because before 2021, before the Covid-19 pandemic occurred, I understand the duties collected by Port Klang Customs were RM 12 billion. So Port Klang wants to ask because duties are collected at Port Klang. What do the people of Port Klang get? Damaged roads, accidents every day, traffic jams, potholes here and there, vehicles damaged, sprockets bent, and some have even died on the roads of Port Klang due to the weakness of the Government or the Public Works Department (JKR) in maintaining the roads of Port Klang. It hurts, Taman Templer. It is painful to see Port Klang collecting high taxes but not returned to the people of Port Klang. So I hope it is only 0.9%. Port Klang wants to request from the Federal Government, from the total collection of these customs duties, to be returned to the Selangor State Public Works Department so that the Selangor State Public Works Department can maintain, resurface again, and repair the damaged roads, replace missing road furniture, and replace missing signboards in the Port Klang area.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Port Klang. May I ask?

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Yes, Seri Setia first.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Earlier I heard Port Klang say there have been many accidents, collisions, roads damaged, vehicles damaged, lives involved. Do road users know that the road is a federal road and that every accident involving a vehicle can be claimed from the Federal Government? Do they know?

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, the Honourable Seri Setia. That is why I stated earlier that since Port Klang is located in the State of Selangor, the federal roads, we see that the main federal road, after the tolls were abolished, is now maintained under the Federal Government. What complaints do we receive? What netizens often write on social media, especially Facebook: "Eh, the Selangor State Government has a lot of money, eh, why not resurface, why not repair this road?" No, that is not the responsibility; it is the Federal Government's, and the people do not understand and are confused. They think that as soon as the roads are damaged, you just call the State Assemblyman (ADUN) of the constituency, call the Member of Parliament of the constituency, or just call the Councillor so that we can solve the road problem. But when we contact the JKR, the road is owned by the Federal Government, and there is no allocation for the repair works. Applications must be made, and approval sometimes exists and sometimes does not. Even if approval exists, it takes six months. Only recently has the Honourable Bandar Baru Klang been a bit faster. That too was on the basis of flooding. When Jalan Pulau Indah was badly damaged due to the effects of flooding and water stagnated for six days. That is all. But apart from that, the people really do not understand.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

What I meant earlier, Port Klang, is that sometimes the road users themselves are involved in accidents. For example, if the road is a local authority (PBT) road and a collision occurs, damage to the PBT road, they can make a claim. Likewise with this federal road. Do they know? Sometimes users do not know.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Yes, the Honourable Member. Some users know, some users do not know. Users who know indeed receive compensation, but the compensation given is also not commensurate with the accidents they experience. And for roads under concession, under upgrading projects, such as the Pulau Indah Highway, the contractor will indeed pay compensation to vehicles involved in accidents caused by the negligence of the contractor or the negligence of the JKR, but the process is very long. Yes, the process is very long. That is after it has happened. What we want now is to prevent it from happening. If roads are damaged, potholed, please repair them immediately, patch them immediately so as not to trouble road users. Yes, the Honourable Hulu Kelang.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

The Honourable Member, the Quran states, with permission, (recitation of Quranic verses). The Honourable Member says 9 percent, yes, 0.9 percent. That has no basis. Returning to the command of Allah: the sky was raised high as a roof, and He established laws and regulations with justice. A balanced scale, so that you do not transgress the limits and carry out justice, and establish the weighing with fairness (recitation of Quranic verses), and do not diminish it in the slightest. Use the most accurate method, professional. Perhaps its value is 12%, perhaps 20%. For what is fair.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Yes, that is all right, the Honourable Hulu Klang. For the time being, Port Klang, during the Pakatan Harapan Government's 22 months in Putrajaya, Port Klang received an allocation of RM 50 million in 2020. And many road problems were solved. Even so, it was not enough. And if the Sheraton Move had not happened, and the Federal Government were still a Pakatan Harapan Government, I am confident the roads at Port Klang, in the State of Selangor, would not be as they are now. Now, when the Government changed back, we feel like stepchildren. The allocations from the Federal Government, although I know the Director of the Selangor State JKR, the Selangor State JKR, the JKR Klang, has tried their utmost to obtain allocations from the Federal Government, it was simply rejected. And it does not give high regard to this State of Selangor; in fact, I understand these allocations are given to states controlled by them.

MR SPEAKER

: Pelabuhan Klang, the final minute.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

So I hope once again, through this august House, to request once more only RM 100 million to resurface and repair again the roads in Port Klang and the roads leading to Port Klang. The roads in Port Klang with high traffic flow can only last no more than two years. You can see the roads resurfaced at the end of 2020 are already damaged now. And that allocation was for repairs, yet roads damaged before that still have not been repaired. So Port Klang once again requests and pleads to the Federal Government for only 0.9% of the RM 11.1 billion, that is RM 100 million, to be given to the Selangor State Public Works Department to maintain, repair and resurface again the roads leading to Port Klang and the roads of Port Klang. Port Klang requests to propose.

MR SPEAKER

: Alright, Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you. Banting also wishes to stand to support the Motion from the Honourable Port Klang, because I was moved by what the Honourable Port Klang said. The spirit of the Honourable Port Klang deserves praise from this august House. Mr Speaker, I see that what is happening is that we continue. I have frequently used the roads, especially the federal roads, in the Port Klang area and around Klang and Kapar. I see that the road conditions in the Klang district are actually in a very dilapidated state, and it is time for us to press and the Federal Government to do something, to treat and change the condition of the roads and infrastructure that is so terrible in the Klang district, especially in the Port Klang area. Compared with the roads in the Kuala Langat district, I think the land and roads in our area are at a better level. But we must remember that Port Klang is a port of international standing, involving its road users. Many transport companies, giant companies, multinational companies. I appreciate the contribution and also the input from the Honourable Port Klang. He has done a very thorough homework or research. I think he deserves praise, but unfortunately, Honourable, although we have the Sheraton Move, today your speech should be directed over there. Look at how empty the seats over there are. Empty. Only Semenyih. I congratulate Semenyih. Semenyih has indeed been here from the past until now. I invite Semenyih to join us. Join us. Or at least convey their intention.

However, Honourable Mr Speaker, my purpose in mentioning this matter is that, as far as I know, the Honourable Sungai Air Tawar is the Political Secretary to the Minister of Finance, and as we know, it is well known that the Minister of Finance actually controls the expenditure of all Ministers and all Ministries. Although Port Klang is under the Ministry of Transport and these roads, these JKR roads, are placed under the Ministry of Works because they involve Federal Government allocations, all funding or special or specific allocations to maintain its lights, its roads, its drains, are under the Minister of Finance. The Minister of Finance must approve a specific allocation to be released to the Ministry of Works so that the Ministry of Works can carry out the necessary maintenance works. Whether it is done as a one-off or on a periodic basis. That is the reality. I can speak like this because I once faced a roughly similar problem. The Klang–Banting Federal Road, which the Honourable Member also mentioned earlier. I was very interested. Those sections, when I first became ADUN in Banting, were pitch dark; you could not see a single thing. Do not look for us. If we drive in the middle of the night. In Chinese, pitch dark, you cannot see your fingers. That is how terrible the situation was there. I had to ask the Ministry of Works, the Minister of Works, to do something. The Ministry of Works said they had no allocation because this is a specific allocation from the Federal Government. It must receive an application and approval from the Ministry of Finance. So I had to..

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

The Honourable Banting, the Honourable Banting, since we are almost at the very end, do not be too harsh. Yes, there is money, Honourable Banting. Our country is rich. Our country was once rubber; I once told the story, rubber from Brazil was brought to Malaya and simply thrown in. Whatever our country does not have, we have. Oil we have, palm oil we have, rubber we have, gold we have, all sorts of things. But the problem is that this money must be used to pay debts. And these debts are 1MDB debts. This is the problem. Then these debts require paying billions, billions, billions that must be paid. So that is why the road near Port Klang also goes "dangdut", dangdut. Banting, do you know dangdut?

Tuan Lau Weng SanDAP · PHBantingEN

Tremors, tremors. Earth tremors.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Haa.. earth tremors. This is the problem. That is why we want to ask Semenyih earlier, Semenyih, because Allah said, "Do not incline towards oppressive leaders, lest the Fire seize you." Haa, the one who said this is not the Chairman of JKKKK, you know, haa, the one who said this is not the Chairman of JKKKKK. This is Allah who said, "do not incline." How about "incline"? In ancient times there was a caliph who was very oppressive. His shirt button, for example, his robe was torn. He went looking for one shop, one shop, one shop, to sew his robe. No one dared to sew his robe, because he was an oppressive leader. Do not incline towards oppressive leaders, lest the Fire seize you.

Tuan Lau Weng SanDAP · PHBantingEN

To the Honourable Member for Taman Templer, as the Malay proverb goes, "one does not say no to a thousand excuses, one seeks a thousand ways." Where there is the will, there is surely a way. If we make an effort to carry something out, the allocation proposed by the Honourable Member for Pelabuhan Klang surely exists. But it is admitted even by the boss of the Minister of Finance, who is the boss of the Honourable Member for Sungai Air Tawar, that the Government must pay its debts, billions and tens of billions of ringgit. That is not payable now, but in future it must still be paid. But what hurts me more is that today we see the seats over there empty. How much longer must we keep discussing the very bad condition of the road in Pelabuhan Klang? How long? I want to ask this honourable House, I want to ask everyone, I want to ask Semenyih, it never ends. Since we became the government, the Federal Government in 2018, only then did we see a little breath or change. There was a specific change mentioned in the Federal Government's budget. We were so happy. Finally this road, this problem, was given a little solution. But unfortunately, as I said, it did not turn out that way, because the Sheraton Move all reverted to the original situation. And here today we see that the individual who

can convey the message, the Political Secretary to the Minister of Finance, is not present. He is not the only one; others are also absent. Then when we raise this issue and we are asked to press the Federal Government to do something, we are told we are playing politics. What is this? We want to solve the problem of this road, which is a federal road, the responsibility of the Federal Government. The Minister of Finance's allocation is passed to the Minister of Transport if it is for Pelabuhan Klang, and if it is for the roads, it goes to the Minister of Works. All three of these ministries are under the Federal Government. Where did it go wrong? That is what I want to ask.

That is why I strongly support this motion from the Honourable Member for Pelabuhan Klang, that we must be vigilant. I think I am trying to convey in this honourable House that there is a possibility that in future Pulau Carey will be made into a port, and in fact we have not yet seen it, and civil servants and government officers have also conveyed to us that we do not want to make it another Pelabuhan Klang. We want to be as big as Pelabuhan Klang, but we do not want the infrastructure like Pelabuhan Klang. There must be specialisation in terms of maintenance, upkeep and administration. We need a special area plan. We have specialisation in terms of financial allocation to that extent. Even government officers themselves do not want it if Pulau Carey in the district of Kuala Langat is made into a port of an international standard, as great and standing as Pelabuhan Klang. We also do not want the infrastructure of Pulau Carey later to become like what has happened to Pelabuhan Klang now. I hope that even though they are not here, they will be able to feel the hardship of the people in the Pelabuhan Klang area. My area also has hardship. There are very many residents in the Jenjarom and Sungai Jarum areas. I am sure the Honourable Member for Sijangkang agrees with me. They who work at Pelabuhan Klang have to commute back and forth by motorcycle.

If we look at the condition of the Klang–Banting road, especially in the Sijangkang State Assembly (DUN) area now, we can see what is happening. There is already the LRT3 infrastructure development, but how the road is full of potholes! I respectfully ask the Federal Government to really get on with the work. Stop just playing politics with the State Election and elections here and there; what is the use if they cannot get work done? So, Mr Speaker, I strongly request support, and I request the House to support and pass this motion. That is all, thank you.

SpeakerEN

Alright, the Honourable Member for Banting. Honourable Members, this motion has been seconded by Banting. Is there anyone else? No, then. Alright, I ask the Government side whether there is anything? Keep it brief, just a little.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Mr Speaker. Honourable Members who have debated or who have brought motions relating to allocations from the Federal Government for roads

that are under the Federal Government. Actually, if Honourable Members have followed every debate and speech of mine in this honourable House, I have always mentioned this matter: that we need to focus on the whole road network system, regardless of whether it is a state road, a local authority (PBT) road or others. Why? Because the people down there see that all of this is the responsibility of the Government, whether the Federal Government or the State Government. They do not ask whether this road is a state road or a federal road; they will still blame everyone. And that is also why, when accidents happen, the responsibility falls on all parties, because they do not choose, "I want to have an accident on the federal road only, not on my state road." This cannot be; that is not how accidents happen. I have proposed this several times and I have also mentioned in this House my meetings with officers of the Ministry of Works and with the Director-General of the Public Works Department (JKR) Malaysia. Two Directors-General whom I had met before, and I proposed that there is a method, actually. It is not logical to have a road system without a fixed allocation to manage it, because it requires regular maintenance.

So I say, simply, the first method I mentioned is to establish a single Act like MARRIS, because MARRIS does not cover federal roads, so include them. Man-made laws, after all. If other laws, like those made in Parliament, are included in MARIS, so that it is managed with allocations similar to the State Government and local authority roads, where there is a fixed allocation every year to manage federal roads. That is my first proposal. If the Federal Government does not want to do that, it can be gazetted, changing federal roads into state roads. We would register them under MARRIS and we would use MARRIS allocations to help manage those roads more easily. I prefer the second option, as it is easier for us to manage under JKR Selangor, managing the roads that were originally federal, which we would de-gazette, changing the gazette into state roads. Both proposals are capable of being done, and I am confident that if one of these options can be chosen, we can manage our roads much, much better with the existing MARRIS allocation. This is my proposal, which I have made. I accept the proposal and agree with the views of the Honourable Member for Pelabuhan Klang and also of Banting, that we should also give a little more focus to the development areas around Pulau Indah, Pulau Carey and also Pelabuhan Klang, because this area was only recently presented by the Honourable Member for Bandar Baru Klang during the EXCO retreat on how this place will become a rapidly growing development in future, not only the port but also coastal developments and so on, which require good infrastructure. So this road system, as we know, is really challenging in Selangor, not only because of the heavy traffic congestion and heavy vehicles, but also because we have land, strata land, that is very, very difficult to build on, namely marine clay, which is along the Selangor coast; it is indeed a marine clay area that is very difficult in terms of its geotechnical aspects for managing how to build a site or buildings on such land. That is a major challenge we face, apart from traffic congestion or the many vehicles. So all of this must be tackled with available technology and proper development methods. If it is done together, I am confident it can be managed and the impact of what has been raised earlier can be minimised. That is the Government's view. That is all, thank you.

SpeakerEN

Honourable Members, the matter before this House is a motion that reads: that this honourable House urges the Federal Government to provide an allocation of RM 100,000,000.00 every year to cover the maintenance, resurfacing and repair of roads and road furniture of federal roads leading to Pelabuhan Klang and the Pelabuhan Klang area.

Honourable Members who agree, please say "Yes." Yes.

Honourable Members who do not agree, please say "No." No.

This motion is Agreed.

Motion to Adjourn the HouseMotion

Secretary of the HouseEN

The next order of business: motion to adjourn the House.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Speaker, honourable Members of the House and all who have followed this sitting. Alhamdulillah, we have succeeded in completing one of our major responsibilities, to hold the first sitting of the House for the year 2022, and it was carried out according to schedule, unlike in previous years. May what we face be continued well, and may every discussion that has been raised, especially the issue of floods that has dominated throughout this debate, be tackled together, while strengthening consensus among one another. Honourable Members, a few days ago I was visited by the Director of the Election Commission (SPR) of the State of Selangor, who informed me about the effects of the increase in voters aged 18 and the effects of automatic voter registration. I would like to inform you briefly before our House sitting ends, because this is one of the agendas that the State Government hopes to submit in the coming session, or at least in the budget session, namely our efforts to ensure that the number of seats in our State Assembly is commensurate and fairly balanced with the number of voters, which has increased quite drastically. Honourable Members, I would like to inform you that there are 3.66 million registered voters in the State of Selangor today, and seeing the monthly increase in voters in proportion to automatic registration, with more than 89 thousand, it means that within 12 months from now the total number of voters in the State of Selangor will reach about 4.6 million, or perhaps may reach 5 million. In my hand is the result of the feedback from the SPR to me; we find that there are 19 state constituencies, or 19 State Assemblies, that have more than 75 thousand voters. These State Assemblies are Batang Kali, Gombak Setia, Teratai, Semenyih, Kajang, Balakong, Sungai Ramal, Seri Serdang, Kinrara, with the highest at 118 thousand, Subang Jaya 109 thousand, Seri Setia 78 thousand, Bukit Lanjan 106 thousand, Kota Damansara 85 thousand, Kota Anggerik 88 thousand, Bandar Baru Klang 82 thousand, Pandamaran 75 thousand, Sentosa 87 thousand, Sungai Kandis 75 thousand, Kota Kemuning 78 thousand, Kota Raja, all of them, and also the last one, Dengkel, 87 thousand.

Honourable Members, we feel it is important for us to add, because some State Assemblies still have very minimal numbers, among them Sungai Air Tawar with only about 19 thousand voters, or Sekinchan with only 23 thousand voters. Therefore, I think, in our view, it is unfair to ensure a balanced allocation of funds and planned development can be arranged in the House. Therefore, one of the agendas we will bring in the coming session, which requires approval of two-thirds in this House, is an effort to add State Legislative Assembly seats, which must then be approved at the Parliamentary level. That is why, in our view and judgement, it is better for us to complete this responsibility so that we can finish this term until 2023, so that this balance can be established and the number of seats can be created without having to hold elections hastily. Semenyih, convey to the President. Honourable Members, therefore, with this I wish to extend a thousand thanks for the views expressed by all Members of the House, and Alhamdulillah, although the atmosphere in our House has been no less intense and rather heated, we still maintain a civilised, prudent debate in presenting views, even though there are certain differences. Once again I thank everyone, and with that I propose that this House be adjourned until a time to be determined later. Thank you.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker, I support.

SpeakerEN

Alright, thank you, the Most Honourable Member for Sungai Tua. Honourable Members, before I adjourn this sitting, I take this opportunity to extend my highest thanks to all Honourable Members, Members of the State Assembly, Heads of Departments, and Government Officers for the cooperation provided to facilitate the smooth running of the First Meeting of the Fifth Session of this term. My thanks are also directed to the Secretary and Assistant Secretary of the House, the secretariat, reporters and all the officers involved, directly or indirectly, for the commitment and seriousness of everyone in ensuring that the meeting ran smoothly. Although this is amid the raging spread of the Covid Omicron pandemic, we still succeeded. To all Honourable Members, please check the draft minutes that have been and will be circulated relating to the speeches of Honourable Members, and return them to the House Administration if there are any corrections, so that the official minutes can be prepared and circulated promptly to all Honourable Members. With this I adjourn today's sitting until a time to be determined later. The House is adjourned.

(THE HOUSE ADJOURNED)