Selangor · 5 December 2022
14th Assembly, 5th session, 3rd meeting · 305 turns · 33,438 words · official PDF ↗ · Digital Hansard ↗
ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.
(Opening)
Good morning and greetings of peace. The Order of Business for the Third Meeting of the Fifth Session of the Fourteenth Selangor State Legislative Assembly on 5 December 2022 begins with the recitation of prayers.
Bacaan Doa.
Oral QuestionsQuestions
The next item on the Order of Business. Questions.
Good morning and greetings of peace to all the Honourable Members. I invite Bukit Lanjan.
Thank you, Mr Speaker. Question 116. Regarding solar lamps.
Oral Questions — 116. Multipurpose Solar LightsQuestions
116. To ask Y.A.B. Dato' Menteri Besar:-
a)
The State Government is carrying out a project to install solar lamp posts in Selangor. How many solar lamp posts will be installed for 2022-2023?
b)
Will these solar lamps have additional facilities such as Wi-Fi, CCTV and air pollution monitors?
c)
What is the total cost to be spent?
Thank you, Mr Speaker. In answer to the question from Bukit Lanjan. The State Government is carrying out a project to install solar lamp posts in Selangor. How many solar lamp posts will be installed for 2022-2023? Is that the correct question?
Under the programme for solar-type LED street lighting, the number of lamp posts planned for installation across the entire Selangor State Assembly constituency area is 600
units. The implementation of this programme is divided into 2 phases, where Phase 1 began on 15 August 2022 and is expected to be completed on 15 November 2022. The number of solar lamp posts for Phase 1 is 390, for 31 state constituencies. The second question, will these solar lamps have additional facilities such as Wi-Fi, CCTV and air pollution monitors? There are no additional facilities, with the allocation received, but the lamp posts are able to accommodate any additional facilities if required in future. Third, what is the total cost to be spent? The total allocation applied for is RM 6 million. The allocation received for Phase 1 is RM 3 million and the final cost is RM 2,984,175.00, a saving of RM 15,825.00. Thank you.
Soalan tambahan.
Balakong?
I would like to ask the Government, regarding the installation of solar lamp posts in Selangor, whether there is a timeframe for all the projects for Phase 1 of the installation? Because until now 10 lamp posts still have not been installed in my area. Thank you.
Still no posts, is it? Go ahead. Go ahead.
Thank you, Balakong, for asking the question, but I... is it included among the 31 state constituencies that were selected just now. If it is selected, insyaAllah it is on the way. Because my state constituency has already been installed, so we will refer back to the relevant EXCO.
Kalau boleh
Silakan Balakong.
If possible, complete it before this year.
If there is no problem, it is on the way, yes. Go ahead. Go ahead.
Thank you, Mr Speaker. My question is simply about cost. It has posts, it has lamps. What about the maintenance of those lamps? May I ask for an explanation?
I don't think it's relevant, yes. Not relevant, main road. I next invite Sungai Pelek. Sungai Pelek has not come. Rather strange, not present. Semenyih? Present? Ha, go ahead.
Thank you, Mr Speaker. My question is 118.
Oral Questions — 118. Gugusan ClusterQuestions
118. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the current status of the clustering programme as announced in the 2019 Budget presentation, and to what extent are these clusters progressing, especially in the Semenyih state constituency area?
Yes, Mr Speaker,...
(House in uproar)
Go ahead, Right Honourable Member.
Thank you, because many did not come. Honourable Members whom I love, all of you. Thank you, Speaker, and Semenyih, for the questions that have been put forward. As a state that is advanced and developing rapidly, Selangor needs to have a productive, stable economic base with added value in the services, manufacturing and agriculture sectors. In addition, Selangor needs to have high competitiveness at the national level in order to attract high-quality domestic and foreign investment and to generate sustainable economic growth for the State. To maintain Selangor's performance as the engine of the nation's economy and for it to keep developing and advancing, the economic clustering initiative of the State of Selangor has been introduced with the aim of strengthening the strengths of a particular focal area, by focusing on existing advantages for the standardisation of similarities to complement accessibility and the related physical infrastructure. In addition, economic activities will be diversified through the use of sustainable natural economic resources, whether renewable or non-renewable, and by introducing new innovative economic bases. Honourable Members, these are the bases that subsequently make what we call the First Selangor Plan. In the First Selangor Plan, for example, IDRISS, SABDA, SMG, and the redevelopment of several localities and areas have been translated.
As for what is specifically related to Semenyih, of course we cannot see it comprehensively, because the First Selangor Plan will be followed by a mid-term review and also followed by the Second Selangor Plan. In the Second Selangor Plan, we will standardise and consolidate what we call clusterisation based on the existing potential. The First Selangor Plan that I mentioned just now is based on several existing readinesses, for example SABDA and IDRISS. These are existing readiness that can bring about several changes and also several strong elements. For the Semenyih, Kajang and surrounding areas, we will of course consolidate them with several elements that we already have before this. For example, the manufacturing sector, located in the area around Bangi, or the residential areas that already exist in the Semenyih area, and some agricultural sectors in some village sectors in the Semenyih area, which I can consider as a sector that can be developed, but we will need to look at the existing opportunities; it cannot move in a piecemeal manner but must move as a comprehensive regional development area. Yes, so if asked whether clustering is developing or not, one clear indicator is the existence of several planning or plans that we have regarding regional development areas in the First Selangor Plan. Thank you.
Soalan tambahan.
Semenyih?
Thank you for the progress made, especially in Semenyih, on development, but does the State Government plan for development to be more integrated, or for development that involves residents' problems to be taken into account in the development space? Thank you, especially pollution.
Thank you. Semenyih, this is certainly one of the elements we take into account and part of what the Honourable Member for Semenyih mentioned. We are also implementing, for example, part of the SJAM project, the Selangor Raw Water Guarantee Scheme, at the Semenyih Water Treatment Plant. That is part of the steps we have taken or have implemented, and recently I want to inform you that there were 2 incidents, yes, within a period of 2 days along the stretch of the Semenyih River, also called the Langat River, which started from pollution from Negeri Sembilan, 2 consecutive days. Alhamdulillah, due to our hard work in controlling the areas concerned, both areas, both pollution incidents reached orange code or yellow code, and did not reach red code. There was a suspension of operations, but the suspension of operations lasted only around 2-3 hours because we were able to control it. That shows that we are always improving our efforts, and we will add further with cooperation such as the Department of Environment, the National Water Management Commission (SPAN) and so on, to control and ensure pollution, which often occurs in Semenyih. This year alone, everything that happened in the area around Semenyih, which we will be able to tackle and which we are able to manage. Thank you.
Jeram? Oh, he has appeared. Go ahead.
Thank you, Mr Speaker, my question is 119.
Oral Questions — 119. Hijrah SelangorQuestions
119. To ask Y.A.B. Dato' Menteri Besar:-
a)
What are the criteria for selecting a CEO of Hijrah? Is the CEO of Hijrah who is serving qualified?
b)
Is it according to the criteria set, or is it merely a political appointment?
c)
What are the achievements of the CEO of Hijrah in helping the Selangor entrepreneurs programme succeed?
Honourable Members whom I love, all of you. The criteria for selection to the post of Director of Hijrah are based on relevant work experience. Expertise and knowledge in the industry, as well as the ability to lead an organisation such as Hijrah. Candidates are selected through 3 screening processes: nomination and remuneration, the nomination and remuneration committee of the Menteri Besar of Selangor Incorporated, or MBI. Then it is brought to the Board of Directors of MBI and the Board of Trustees of Yayasan Hijrah Selangor, as stipulated in the procedures for the appointment of key positions of MBI and companies owned by MBI. YBhg. Dato' Seri Mohd Suparadi bin Mohd Nor, the Executive Director of Hijrah, has experience in the same industry, where his last position before holding the post of Executive Director of Hijrah was as Chairman of Tekun for 2 years. Before that, he served in several large companies such as Iris Corporation, SJ Securities Sdn Bhd, Bank Bumiputera (M) Berhad Securities and Bank Bumiputera Berhad. He was also selected as a candidate to contest in the general election and resigned from the post of Executive Director of Hijrah with effect from November 2022. As has been stated, the appointment of the Executive Director of Hijrah is based on work experience and relevant expertise, knowledge, industry and ability to lead an organisation such as Hijrah, and for the information of the Honourable Member, even before this the candidate for Executive Chairman did not hold the post of CEO, but his duties were almost the same. A political person, but with a background as part of those who established Amanah Ikhtiar Malaysia, and this time we have taken those who are experienced in a field that is almost the same, namely Tekun or the provision of loans as implemented at the Federal level.
Several initiatives have been implemented... introducing Hijrah's strategic partner financing in helping to expand the agriculture and business sectors, as well as a mechanism that guarantees loan quality, increases income and consistently disburses new financing amounts. Secondly, there are various initiatives introduced, for example i-Agro for agriculture, animal husbandry, aquaculture, i-Lestari business financing, financing of up to RM 100 thousand, seasonal schemes, seasonal water, short-term business providing additional capital for business activities during festive seasons such as Hari Raya Aidilfitri and Deepavali. A social water scheme, additional capital for entrepreneurs or the people of Selangor for purposes of education, training, courses, repairing houses and buying or repairing vehicles.
Thirdly, the implementation of Hijrah's Shariah-compliant financing projects through tawarruq financing. Shariah-compliant financing began in March 2022, in line with the desire to give added value and more meaningful transformation to Yayasan Hijrah in the context of Shariah compliance. Thank you.
Soalan tambahan.
Jeram?
Thank you. Since the CEO has already left, I, I withdraw it, Mr Speaker, yes. The CEO has already left. Yes, so the question, I have no supplementary question. Thank you.
What, that's nothing, next time I will not permit questions that are not relevant, yes. He must ask a supplementary question. Alright, yes, Jeram? Alright, next, Sementa.
Thank you, Mr Speaker. My question is No. 120.
Oral Questions — 120. Flash Flood Problems in Teluk KapasQuestions
120. To ask Y.A.B. Dato' Menteri Besar:-
a)
What are the proactive steps of the State Government to overcome the flash floods that occur every time there is heavy rain?
b)
What are the short-term and long-term plans of the JKR (Public Works Department) to solve this problem? When will the upgrading of the Kalbet drain be carried out?
c)
When is the flash flood problem that haunts the residents of Teluk Kapas expected to be resolved?
Thank you, Honourable Member for Sementa. Right Honourable Member, Mr Speaker, this question is in fact closely related to the question that I have already answered from Sementa too, question 76. I have explained that the drainage issue on both sides of this area on Jalan Telok Kapas is under the maintenance of the Klang Municipal Council, which has been irregular, and which we are coordinating to ensure the water flows to the floodgate area. For the time being, at the floodgate we have placed a mobile pump with a capacity of 10 cusecs, which I mentioned at the Jalan Palembang floodgate. For the long term, it requires coordination or correction of the drains on both sides of this area. That is what we are coordinating by the Klang Municipal Council. Thank you.
Soalan tambahan.
Sementa.
Will the State Government carry out maintenance to upgrade the existing earth drains to what, drains of, concrete drains. Thank you.
That is indeed a programme under the State Government, where we monitor and look at the needs from time to time to increase the upgrading of these earth drains, because these earth drains, as we well know, are indeed many, and we cannot change them all at once. Their maintenance requires some problems in terms of upkeep, because their banks easily collapse, which is why we replace the stages at places according to priority with culverts or concrete drains, yes. Thank you.
Dusun Tua?
Alright, previously the State Government opened channels for complaints relating to drains involving the local authorities (PBT). Is the State Government making any efforts or proposals to open complaints for drains under the maintenance of JKR? Thank you.
The issue of public complaints, or complaints including these drains, we open them through various methods; one can still use the existing methods or go directly to the Department of Irrigation and Drainage (JPS) or the local authorities (PBT) themselves. Because we look at all these complaints as a whole, and these drains, if we say we set one place, it involves various agencies and departments. So that is what we need to coordinate. Some we think are under JPS, but are under the PBT, so they can be channelled according to the method and directly to JPS or to the relevant PBT. Thank you.
Bandar Utama?
Thank you, Mr Speaker. My question is No. 121.
Oral Questions — 121. Inadequate development of sports facilitiesQuestions
121. To ask Y.A.B. Dato' Menteri Besar:-
a)
Will the State Government of Selangor consider developing rarely found sports facilities such as a velodrome?
Right Honourable Member, Mr Speaker, Bandar Utama asked about the velodrome, the construction of a velodrome. Will the government consider developing a velodrome. So, for the information of the Honourable Member for Bandar Utama, at present the velodrome we use is in the Nilai area; there is one velodrome that I believe is also close to Selangor. We can consider developing our own velodrome. If firstly there is an urgent need, meaning it is worth building the velodrome. Secondly, in a suitable location, and thirdly, there is the capacity to maintain the velodrome. Because for the information of the Honourable Member for Damansara Utama, eh, Bandar Utama, the construction of a velodrome alone reaches RM 50 million in cost, and the annual maintenance cost is RM 5 million or RM 417,000 per month. So it is rather heavy, except if we have an event at the state or national level, I think then it is worthwhile to do it. For the time being, we still use the existing velodrome in Nilai, which is the closest to us. Thank you.
Bukit Melawati? Not present. Teratai? With the lotus flower, not present. Sungai Panjang? Sungai, also long, not present. Lembah Jaya? Present. Go ahead.
Thank you, Mr Speaker. My question is No. 125.
Oral Questions — 125. Public library demolished to make way for the Suke projectQuestions
125. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the status of the construction of the public library to replace the one that was demolished to make way for the construction of the SUKE Highway in Lembah Jaya Utara?
Thank you, Speaker. Thank you, Lembah Jaya, for the question that has been put forward. The construction work for the library in Taman Seri Ampang is ongoing on site, and there has been a delay in physical progress against the original schedule because the original contractor was unable to complete the project. The company has changed 2 contractor companies previously.
The new contractors were appointed on 2 November 2022 and began work on site on the 4th day of November 2022, continuing the previous work. This project, due to several delays, is expected to be completed from April 2023, if I may list the percentage of delay:
CURRENT STATUS OF PROJECT Physical Progress (As of 7 November 2022) Actual 52% Schedule 64% Behind -12%
Photographs and also the site progress I can provide to the Honourable Member so that the Honourable Member can see them and perhaps wish to make a site visit. Thank you.
Batang Kali? Not present. Still not present. Next, Permatang has been answered, No. 36, yes. Permatang's question has been answered. Kuala Kubu Baharu?
Thank you, Mr Speaker. My question is 128.
Oral Questions — 128. Private Chinese Secondary Schools in SelangorQuestions
128. To ask Y.A.B. Dato' Menteri Besar:-
a)
Does the State Government intend to add one more plot of land for a Private Chinese Secondary School in Selangor? If so, state the details.
b)
State the educational assistance provided by the State Government to Private Chinese Secondary Schools in Selangor this year.
Thank you, Honourable Member. Education is among the main focuses of the State Government of Selangor, and it is embodied in a commitment of RM 26 million for the rebuilding or refurbishment of school infrastructure in the State of Selangor. This includes assistance to Sekolah Agama Rakyat, Sekolah Jenis Kebangsaan Cina, and Sekolah Jenis Kebangsaan Tamil. In addition, among the other schools with high demand is the Chinese Private Secondary School. Apart from the increase in the number of students, one reason is the locality factor, because all four existing Chinese Private Secondary Schools in the State of Selangor are located in the Klang District. In view of this situation, the State Government is on track to determine a location for the establishment of a new Chinese Private Secondary School outside the Klang District. Several areas have been identified in the Petaling District and the Hulu Langat District for that purpose. A study will be carried out after the consultation process with stakeholders is completed, before the official announcement of the school site location is made. Based on our planning, we should ideally carry it out around October or November, but we also hold the view that if we rush it, it will become a political tool for our side and also for the opposing side, so I feel that it is better not to do it. This is in the interest of education, but we believe that in the first quarter of next year, we can determine the school site that was promised.
The State Government has allocated RM 2 million to the Chinese Private Secondary Schools (SMPC) in the State of Selangor. The handover of cheques to these four (4) schools was completed on 17 October 2022 at the Foyer of the State Secretariat Building (SUK), Shah Alam. Thank you.
Pelabuhan Klang?
Thank you, Honourable Member, Mr Speaker. Question from Pelabuhan Klang, question no. 129.
Oral Questions — 129. Problem of Road Markings Fading and DisappearingQuestions
129. To ask the Right Honourable Dato' Menteri Besar:-
a)
What actions will the State Government take to address the problem of faded and missing 'Road Marking' on roads under the local authorities (PBT), District Offices and the Public Works Department (JKR), to the extent that it endangers road users, especially at night?
Thank you, Pelabuhan Klang, Honourable Member, Mr Speaker. Pelabuhan Klang has asked a question regarding the issue of road marking, or road markings that are increasingly faded and missing.
For the information of the Honourable Member, based on the State Road Maintenance Long-Term Contract, the maximum quantity (per year) for line painting works for protocol roads and main roads is 0.4% of the area of paved roads under the contract in question, carried out periodically, yes. As for Secondary and Minor Roads, the maximum quantity (per year) for such work is 0.2% of the area of paved roads. This is based on the records or annual monitoring that have been carried out. The works may be implemented under the routine maintenance of the contract in question. Apart from that, they may also be implemented if additional needs are found, through Work Orders and quotation tenders. This involves not only road lines but also arrows and other symbols that must be on the road surface according to the relevant Road Technical Directives. When the existing road condition cannot comply with the set standards, or the existing road markings have faded, road furniture or safety equipment must be installed to make up for the shortcoming. The installation of 'delineator posts' or reflector posts will help drivers determine the actual alignment of the road in question, especially at night, yes. They are usually installed on the road shoulders, on the left and right of the road. Road barriers, or guardrails, installed together with light-reflecting plates on their sides. They help road users drive and will act as guides when driving at night, meaning that it is not only the lines that determine road safety, but these furniture items have also been equipped with systems to assist driving. For roads with bends, the installation of 'chevron' signboards, which are the yellow ones with black arrows, will act as warning signs, especially at dangerous bends or critical dangerous bends. These signboards not only have a clear size but are also installed in sufficient numbers and at uniform spacing according to existing standards. The installation of road safety equipment such as 'road studs', 'flexible posts' and the like can help provide guidance to road users when driving in areas where road markings have faded and where lighting is poor. Thank you.
Soalan tambahan.
Pelabuhan Klang.
Thank you, Honourable Member, Mr Speaker. Supplementary question from Pelabuhan Klang. How long does it take, if a newly resurfaced road is to be given new road marking? Because I have a road that was resurfaced by the Selangor State Public Works Department (JKR) one week before the election, and now it has been two weeks, three weeks, and up to today that road still has no road lines. But if we listen to the answer given by, the one said by the Honourable Member for Pandan Indah just now, it sounds very beautiful, but the implementation on site is not as what was said.
Thank you, Honourable Member. As mentioned earlier, this relates to road maintenance. For roads that are completed, roads that already exist whose lines have faded, they have their own specific SOP, because they are maintained by contractors who have clearly obtained long-term contracts. That means they will implement based on the need for regular maintenance, not only lines, but also grass cutting and so on. But for new roads, they are subject to the new contractor who has been given the contract to complete the road, including this road marking. So if they have to comply with the directions or contract requirements in question, if there is a delay, there is a problem with the contractor or there is a problem with works that are not yet complete, because usually this road is the last one we do after the road is completed, and this has been confirmed by JKR itself. Once we recognise that the road is okay, then the marking can be done. We do not install markings if the road is not yet properly completed. So there is a problem there, or a problem with the contractor himself. We will monitor this case by case, for the projects concerned. Thank you.
Soalan tambahan.
Sijangkang.
Thank you, Mr Speaker. My question is, I see that humps or speed bumps are among those that can sometimes pose danger, let alone when their paint has faded, because I think generally they are only painted when the bumps are made and then left as they are, especially during rain and also at night when there is no lighting. I think we can look at giving this special attention. A study may be done, perhaps painting them twice a year or so, for the safety of the public. Thank you.
Yes, thank you, Sijangkang. Indeed, this includes the road markings, and also includes the existing bump system, which must also be included in the maintenance I mentioned earlier. However, sometimes in terms of delays and lateness in implementation, there may be problems from the contractors. What we monitor is that not all contractors are meeting the requirements; some have a few problems here and there, which we have to guide and help them so that they carry out the work according to specifications. And if they have met the quota, for routine maintenance, we have to open separate quotations under work orders to meet the needs. For certain roads, sometimes their maintenance rises much higher than what we have set, and that requires work orders and so on, which we implement from time to time according to the case or according to the road. Roads in Selangor are not all those with serious problems that have reached the stage of needing upgrading. Some roads have very minimal maintenance, so all of this must be examined by us case by case. Thank you.
Taman Templer is absent. Sungai Burong is absent. Kampung Tunku is absent. The next question, 133, has been answered together with number 7, and the next question, 134, has also been answered together with number 2. Sentosa is absent. Hulu Kelang is present.
My question is Number 136, Mr Speaker. Thank you.
Oral Questions — 136. Relocation of Squatters at Kampung BerembangQuestions
136. To ask the Right Honourable Dato' Menteri Besar:-
a)
During the relocation of squatters to Pangsapuri Berembang Indah some years ago, 60 families who were not listed were eligible to purchase units in the flats. What steps has the government taken to assist them?
Thank you, Mr Speaker. The question from Hulu Kelang asks about Pangsapuri Berembang Indah. Some years ago, for the information of the Honourable Member, in 2008 the State Government directed Permodalan Negeri Selangor Berhad (PNSB) and the developer Perspektif Masa Sdn. Bhd. to obtain 68 units of Low-Cost Houses (RKR) in Kampung Berembang to be offered to the 68 squatter families involved. Subsequently, on 22 January 2009, the State Government offered solutions to the 68 Kampung Berembang families as follows. Firstly, 54 Head Families. The 54 identified Head Families, namely each head family received an offer to own a Low-Cost House (RKR) in Kampung Berembang at a price of RM 35,000.00 after deducting a subsidy of RM 7,000.00 from the original price of RM 42,000.00. Ex-Gratia payment of RM 35,000.00, meaning no payment for the purchase of the RKR. That is, they could take the house or take cash, and a Relocation Allowance of RM 2,000.00 for each head family. In addition, 14 Additional Families approved, namely each additional family received an offer to own a Low-Cost House in Kampung Berembang at a price of RM 35,000.00 also, after deducting a subsidy of RM 7,000.00 from the original RKR price of RM 42,000.00. So for those who did not choose to own a house, they received an Ex-Gratia payment of RM 25,000.00, being the purchase of an RKR at a price of RM 10,000.00. So, a Relocation Allowance of RM 2,000.00 for each additional family. So PNSB together with the developer Perspektif Masa Sdn. Bhd. have indeed taken action by preparing 68 RKR units in Kampung Berembang to be offered to the 68 families concerned as follows. Firstly, the offer letters for ownership of the Kampung Berembang Low-Cost Houses were submitted to the 68 families concerned on 6 May 2009. After that, the old units were vacated and handed over to the Kampung Berembang Residents Committee on 18 May 2009. Approved first, and the names were submitted, and a draw for the head families was held on 20 May 2009, and each family that drew received the lots that were picked. Fourth, Sale and Purchase Agreements for the 68 RKR units were signed on 15 June 2009, and finally the Vacant Possession (VP) / Key Handover to the owners of Pangsapuri Berembang Indah was fully carried out in August 2012. That is all, Mr Speaker.
Soalan tambahan.
Hulu Kelang.
Thank you, Mr Speaker, and thank you, Honourable Madam EXCO. My question is about what the developer can do if residents are not interested in occupying the place. So my question is what is the problem of interest, because it is common property, common property must be managed, but common property is not managed in the translation
JMB is a surcharge of less than 30% or 40% of residents who pay. So no one wants to manage the JMB. Thank you.
Thank you, Honourable Member. Actually, according to the records provided, all of them have taken the housing units that were prepared, namely 68 people. So the question of what should be done if they do not want to take them, in fact they have already taken them. So their process is done, they have taken them, so they must stay there, and if there are issues arising with the JMB, that will be resolved differently. The basic issue asked by the Honourable Member for Hulu Kelang is whether they were placed; if, before the key handover, they did not agree, they could take cash, but now they have completed it, they have taken and have stayed. But the question of the JMB issue, insyaAllah, Honourable Member, I will look at that matter separately, so that the issue of whether management capacity and so on is lacking, we will handle differently.
The JMB charge is RM 65.00, which I think is low. So there is no reason for them not to want it; they do not understand the concept of looking after shared rights: staircases, drains, lights. RM 65.00 is sufficient. Because the effects are that the water pipes burst, after that the house pipelines will be damaged, and they will ask for help from the ADUN.
InsyaAllah, Honourable Member Hulu Kelang. I will go and look into this matter. Actually, we have a solution for JMBs without good management. We have a new method of how we will take over the management under the COP, and in the end we will not hand the matter over to residents or owners to resolve. That is all, thank you.
Seri Setia is present.
Thank you, number 137. Always present.
Oral Questions — 137. Selangor football team's performance has declined since 2009 and it has not won any trophiesQuestions
137. To ask the Right Honourable Dato' Menteri Besar:-
a)
Is there no target of sport types to be given more allocation to raise the name of the State of Selangor?
b)
What is the plan of the State Government of Selangor to restore the former glory of Selangor Football, or is there a proposal to involve ADN in the FAS committee?
Thank you, Honourable Member Seri Setia. Regarding football, what is the State Government's plan for performance. I think, first, we congratulate the Selangor Team for reaching the finals, although they have not yet won, which is a good development. I have spoken with the CEO of Red Giant, and Red Giant is reorganising their team, including the technical team, to bring in officers from outside the country, specifically to help in terms of sports science, technical matters and various others. As for what is already in place, I think we have a good football development system. We have the National Football Development Programme (NFDP). In Selangor, there are four schools designated as NFDP Centres, namely at Sekolah Shah Alam Seksyen 7, in Klang, in Kuala Selangor and in Hulu Selangor. We have the NFDP Programme, but for areas that do not have the NFDP Programme, the Selangor State Sports Council together with the School Sports Councils also have their own football programmes. We hold them in Sabak Bernam, in Kuala Langat, in Sepang, together with the Local Football Academy, and according to their respective areas. So yes, we have our football development system, and I think we are giving our football performance in Selangor the opportunity to win the upcoming Malaysia Cup this time. That is all, Honourable Member.
Tambahan.
Seri Setia.
Thank you, Mr Speaker. I would like to ask the Honourable Madam EXCO. First, I would like to congratulate, because we succeeded in obtaining second place in the Malaysia Cup. Before the final that day, I asked this question. So I take the opportunity to congratulate the Selangor Darul Ehsan Team. Alright, my earlier question: I congratulated the EXCO, stating that there were stages where they went to every place. In the past, through our districts, we went to every district to look for football players, even in villages, but I also want to ask whether next year there will be additional allocation for them to improve, and congratulations also that we have a local coach, Tan Cheng Hoe, who is better than the coach
from Germany. Previously Germany, but could not be used, we have a local coach. So is there additional allocation for them, and is the EXCO also involved in this FAS Committee?
Germany is already out.
This FAS, Red Giant, has been privatised under MBI, and I think we maintain the structure so that FAS is run by those who are skilled. As for the allocation, we have a contribution to the Football Association of Selangor, as announced by the Right Honourable in the budget every year. For other sports, the allocation available to MSN remains RM 7 million a year. That is the only channel used. As for the NFDP level or the Selangor State Sports Council level that I mentioned earlier, based on the existing allocation for seven years, which we improvise from that allocation, and insyaAllah we manage with what we have, and we hope for better results in the next season.
Jeram.
Thank you, Honourable Member, Mr Speaker, but my question, the issue of my question has been resolved, so I give way to the next question. Thank you.
Don't want, the answer is no, yes. Meru.
Thank you, Mr Speaker, my question is 139.
Oral Questions — 139. Maintenance of drains along Persiaran Hamzah Alang (junction Jalan Kasim/Surau Meru Ehsan to Pekan Kapar)Questions
139. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
How many times has this drain been maintained since 2015, and which party carried out the maintenance?
b)
What is the State's plan to address the flash flood problem in the Tanah Lot area on this road, from the junction of Jalan Kasim to Surau Darul Akhyar?
Thank you Honourable Meru, Honourable Mr Speaker. The question from Meru concerns the maintenance of drains along Persiaran Hamzah Alang, at the junction of Jalan Kasim to Surau Darul Akhyar, Pekan Kapar. For the Honourable Member's information, part of the drain in question falls under the Federal . However, maintenance of this drain is outside the Federal Road concession. I also do not understand what lies outside the Federal Road, but it is outside the Federal Road concession. This drain was in fact cleaned before, under CSR by the concessionaire, and also departmentally by the Public Works Department (JKR) Klang, but not on a regular basis. So I have mentioned this matter in the debate or in my winding-up reply on the issue of unowned drains and longkang that we are currently harmonising. So we take note of this issue, and we are resolving it, including the flash flood problem mentioned in Tanah Lot, which is related to this drain from the junction of Jalan Kasim to Surau Darul Akhyar. Thank you.
Soalan Tambahan.
Meru.
As the Honourable Speaker mentioned just now, nobody wants to be responsible for this road. For next year, whether or not the State Government has its own plan to take over or do something about this drain, because this is a main drain.
What I mentioned here, the actual process apart from identifying, which we have largely identified, the process to transfer it to other departments and agencies requires many things, including regulations and laws, and also budgetary matters. This related matter needs to be harmonised and will take some time, but for critical places, I have mentioned in the winding-up that we will include them by first repairing them under CSR. This must be done because the situation is urgent, especially regarding longkang and drains. That is all, thank you.
Balakong.
Thank you Mr Speaker, question on Balakong number 140.
Oral Questions — 140. Foreign Workers' Hostel CentreQuestions
140. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What is the latest development of the Foreign Workers' Hostel Centre (PAPA) project?
Thank you Mr Speaker, thank you Honourable Balakong. The Foreign Workers' Hostel project referred to by the Honourable Balakong is located in the Balakong Industrial Area, Mukim Cheras, Hulu Langat District. The State Government, through the Kajang Municipal Council, has approved the Planning Permission Plan, the Infrastructure Plan and the Building Plan. Preliminary works on the site have been carried out, such as clearing, installation of hoarding, project signboards and others. Meanwhile, relocation works were actually started on 1 November 2022. In addition, PKNS has identified several strategic and suitable locations to be made into Foreign Worker Hostel Centres. The State Government also plans to arrange dialogue with the Industry Associations. Thank you.
Soalan tambahan.
Balakong.
May I know what the time frame is for the overall development of this project, meaning when it can be completed. Thank you.
I cannot answer this on behalf of the developer. Usually a planning permission project is approved for three years, but regarding the progress of construction, I cannot answer on behalf of the contractor. Thank you.
Soalan Tambahan.
Meru.
Thank you Honourable Speaker. I would like to ask the Honourable EXCO: for this Foreign Workers' Hostel Centre, are residential houses or housing estates allowed to be turned into Foreign Workers' Hostels? This is because it happened in Meru, and the second question can be answered in writing later regarding the Local Authority (PBT). Please, is it possible to obtain approval for the Klang Central area, Klang, to be made into a Foreign Workers' Hostel?
Alright, for the first question, if we refer to the latest guidelines, residential areas are not allowed. We only allow certain commercial areas to be converted into Foreign Workers' Hostel Centres, or suitable sites identified for Foreign Workers' Hostel Centres. For the second question, the Honourable Member may WhatsApp me the exact location later so that I can make a check with the Klang Municipal Council.
Soalan tambahan.
Balakong.
As far as I know, currently their factories are facing a challenge and problem, namely that their workers have no suitable place to live. So what steps or advice does the Government have to house these foreign workers, especially as we will start the projects again. Thank you.
Thank you Honourable Balakong. As I answered earlier, the State Government through PKNS has ensured several suitable locations to be made into Foreign Workers' Hostel Centres, and to ensure factories understand the application process for foreign workers' hostels. We will hold a series of road shows or dialogues with these associations so that they can obtain information and understand the guidelines approved by the State Government and also the Federal Government.
Sungai Air Tawar absent. Kota Anggerik absent, this is football fever. Seri Kembangan absent. Sementa present.
Thank you Mr Speaker, my question is number 144.
Oral Questions — 144. Mangrove Forest of Kampung Sungai Serdang.Questions
144. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
The death of mangrove trees along the coastline is spreading and destroying the ecosystem. Has any study been carried out on this issue?
b)
Is it caused by the release of pollutants from the KEV Power Generation Station? What is the State Government's action?
Mr Speaker, based on monitoring and conservation and preservation efforts in the Mangrove Forest (HPL) areas in the State of Selangor, it was found that there is no sign of sudden tree death occurring in these areas. However, there is a small portion of mangrove trees that have died due to natural factors such as the trees' lifespan exceeding maturity and the effects of wave erosion. At present, the Selangor State Forestry Department has not carried out an intensive study on these cases of mangrove tree deaths. For information, Kampung Sungai Serdang is not located within a permanent forest reserve, but this area is located near the Kapar Forest Reserve. The Selangor State Forestry Department cannot confirm that the cause of the mangrove tree deaths is a direct impact of pollutant release from the KEV station. This is because a detailed study will be carried out if there is a need. However, KEV's operations are constantly monitored by technical agencies such as the Department of Environment and the Local Authority to control any impact on the environment.
Soalan tambahan.
Sementa.
The EXCO stated that there are no mangrove tree deaths in the area, but I have gone to the location and I saw that most of the area, only a cluster of mangrove swamp, these mangrove trees have died and dried up, and the soil may also look polluted. So I request that the State Government carry out a study on why the area is facing this matter, and also request a study on whether it is due to pollutants from the KEV Power Generation Station.
We will take note, and we will go down to the area to inspect the actual situation, because the statement is correct, and we will take action according to the existing Bill.
Sijangkang.
Thank you Mr Speaker, my question is number 145.
Oral Questions — 145. Status of Covid-19 in SelangorQuestions
145. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What is the status of the COVID-19 outbreak in the State of Selangor up to now?
b)
What is the percentage achievement of vaccination given to the people of the State of Selangor as a whole?
c)
Have all the vaccines purchased by the State Government been used and have they not expired?
Thank you Sijagkang. For question (a), it has been answered by the Honourable Seri Serdang in the Sijangkang question, but there is question (b) that I need to answer, namely the percentage of vaccination achievement among the people of the State of Selangor. Seri Serdang answered last Friday. For question (b), up to 15 October 2022, a total of 14,649,397 doses of Covid-19 vaccine have been administered in the State of Selangor. The following is the achievement of Covid-19 vaccine administration by age category in the State of Selangor. A total of 4.330 million or 4,33,200 adults (96.2%) have received the complete dose of Covid-19 vaccine. A total of 519,617 adolescents (91.6%) have received the complete dose of Covid-19 vaccine, and a total of 320,909 children (43.9%) have received the complete dose of Covid-19 vaccine. For booster doses, a total of 4,069,818 adults (89.4%) have received one booster dose of Covid-19 vaccine, a total of 155,076 adults (3.4%) have received two booster doses of Covid-19 vaccine, a total of 10,202 adolescents (1.8%) have received one booster dose of Covid-19 vaccine, a total of 78 adolescents (0.01%) have received two booster doses of Covid-19 vaccine and a total of 266 adolescents (0.04%) have received one booster dose of Covid-19 vaccine. Below is the table of achievements that I have mentioned briefly just now, and I can provide the percentages to the Honourable Member in the form of this table. In addition, the percentage of vaccine achievement in the State of Selangor, if measured by complete doses under the current Health Department criteria of two doses, Selangor has recorded an achievement of 100%. Thank you.
Dusun Tua.
Thank you Mr Speaker, my question is number 146.
Oral Questions — 146. Coordination of Welfare DataQuestions
146. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
Does the Government intend to harmonise the data of the Selangor Zakat Board with the SSIPR database to strengthen the welfare programmes of the State of Selangor?
Thank you Mr Speaker and Dusun Tua, who asked whether the Government intends to harmonise the data of the Selangor Zakat Board with the SSIPR database to strengthen the welfare programmes of the State of Selangor. Up to now, to facilitate data management, the practice carried out by the Selangor Zakat Board is to conduct cross-checking collaboration with relevant government agencies such as the Department of Social Welfare (JKM), PERKESO and so on. However, LZS will try to create efforts to harmonise data with SSIPR for the purpose of the Selangor State welfare programmes. Thank you.
Taman Medan.
Mr Speaker, question from Taman Medan, number 147.
Oral Questions — 147. Old Building of the Islamic Religious Affairs Office and Syariah Court of Petaling Jaya District in Seksyen 3 Petaling JayaQuestions
147. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What is the function and use of the former site of the Islamic Religious Office and Syariah Court of Petaling Jaya District in Seksyen 3 Petaling Jaya at present?
b)
Is there any plan for it in the future?
c)
Is it possible if any party is interested in utilising its existence?
Thank you once again Mr Speaker and Taman Medan, who asked the question: what is the function and use of the former site of the Islamic Religious Office and Syariah Court of Petaling Jaya District in Seksyen 3, Petaling Jaya at present. The former Islamic Religious Office building in Seksyen 3, Petaling Jaya is still fully used as a Training Centre for courses, workshops and also internal meetings by the Selangor Syariah Judiciary Department (JAKESS). There are three (3) quarter units rented out by MAIS for residential purposes for mosque staff and government staff working around Petaling Jaya. The land was granted to MAIS by way of land alienation in 1989. The express condition for the land is commercial buildings. For the second question, is there any plan for it in the future. There are plans to develop the land, but it is subject to careful planning studies currently being carried out by MAIS. Given that the land is only 1.076 acres, it makes redevelopment difficult. This takes into account the technical aspects stipulated by the local authority and relevant technical agencies. In addition, any development proposals will be discussed jointly between MAIS and JAKESS, considering the operation of the Training Centre and quarters as stated above. For the third question, is it possible if any party is interested in utilising its existence. MAIS also placed an advertisement in local newspapers for proposals to develop this land on 21 October 2021. Several development proposals have been submitted and MAIS is studying these proposals, whether through land leasing proposals or joint venture development.
Soalan Tambahan.
Taman Medan.
Earlier, the Honourable Sungai Kandis mentioned that it functions as a Staff Training Centre for the Selangor Syariah Judiciary Department. At the same time, can the training and course facilities also be utilised by other interested parties, because the facilities are already available, and I think there are parties who are also interested in using them, not only regarding the benefit of its existence in the earlier question, but it can be used and made into a source for the Islamic Religious Council itself. Thank you.
Thank you to Taman Medan for the supplementary question regarding whether other parties can use the premises for training purposes. At the moment I have no answer. I will give a written reply to the Honourable Taman Medan for reference. Thank you.
Banting.
Thank you Mr Speaker, my question is number 148.
Oral Questions — 148. Labohan Dagang Water Treatment PlantQuestions
148. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What is the current designed capacity of treated water production of this plant per day?
b)
Which areas receive treated water from this plant, and what is their daily supply rate?
Thank you Honourable Banting and Honourable Mr Speaker. Banting asked a question regarding the status of the Labohan Dagang Water Treatment Plant. For the Honourable Member's information, the design production capacity of LRA Labohan Dagang is 200 million litres per day (JLH), while the current water production demand is 131 million litres of water per day (JLH). The areas receiving water supply from LA Labohan Dagang are Banting, Sungai Manggis, Telok Datok, Kelanang, Morib, Kampung Bandar and Jugra. The current usage rate for these areas is 131 JLH. Thank you.
Taman Templer, absent. Batang Kali, absent. Teratai, present.
Mr Speaker, my question is number 151.
Oral Questions — 151. Maintenance Schedule for Trees under MPAJQuestions
151. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
Does the State Government provide assistance to MPAJ to add machinery to adequately carry out tree pruning maintenance work?
b)
Has the State Government considered reducing the budget for indent/quotation projects and increasing the budget for adding machinery so that the PBT arranges tree maintenance work to the in-house team?
Thank you Mr Speaker. To answer the question asked by the Honourable Teratai, the machinery and equipment for tree maintenance in MPAJ's administrative area are purchased using MPAJ's own allocation, especially for tree pruning work by in-house workers.
At present, tree pruning work in MPAJ is carried out by in-house workers for complaints and trees with low risk conditions. Trees with high risk will be carried out by contractors appointed under existing procurement. Thank you.
Soalan tambahan.
Silakan Teratai.
My question (b): whether the State Government considers reducing the budget for incident quotation and using that budget to add machinery for MPAJ.
Yes. I think I have answered clearly. For tree pruning work of low risk, it will be carried out in-house, meaning MPAJ's in-house workers will do the work. For high risk, MPAJ will appoint external contractors to carry out the task.
Lembah Jaya.
Thank you Mr Speaker. My question is number 152. Thank you.
Oral Questions — 152. Upgrading Bukit Ampang into a Tourist AttractionQuestions
152. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What is the plan of the Local Authority to make Bukit Ampang a tourism product for Ampang?
b)
When can the tourism project be showcased to domestic and foreign tourists?
Thank you Mr Speaker. Based on the MPAJ Local Plan (Amendment 2) 2020, the land use for the location is categorised as Open Space and Recreation. On 4 July 2019, the Department of Town and Country Planning applied for gazettement of the open space at the Hulu Langat District Land Office. The total area of this location is 25 acres and it is government land. However, for the status of this open space, the application is still in the process of gazettement approval.
The slope class of the land is in classes 1, 2 and 3 (<15 degrees – 35 degrees). Almost the entire area is in class 1 (<15 degrees). The main function of this area is a recreation area and open space, while 30% of the area can be used for commercial activities such as car parks, food courts or kiosks and observation towers.
MPAJ will prepare a comprehensive working paper to be presented at the State Government level involving development proposals divided into 3 time frames, namely:- i. Short term ii. Medium term iii. Long term – involving if with developers
To answer the second question, the Bukit Ampang Development Project can only be showcased to domestic and foreign tourists if the development allocation for the tourism project is approved through various sources. However, the basic matter of gazettement must be carried out first. Thank you.
Soalan tambahan.
Lembah Jaya.
There is activity taking place illegally because this is an existing tourist visiting place. So I request that the State Government through the PBT expedite efforts to upgrade this site. Perhaps you could name or state when the proposal or the presentation of the development proposal for this area will start.
Thank you, the Honourable Member for Lembah Jaya. We will... development will depend on the application for allocations, whether from the State or from the Federal Government. So, planning does exist, but it needs some time. So for the Honourable Member, for the time being we will focus on one project in Ampang too, namely Ampang Look Out Point, where Ampang Look Out Point has been stalled due to landslide problems, so
it has been stopped for ten (10) years. We have appointed one (1) developer contractor to develop the Ampang Look Out Point site into a renowned tourist spot in Ampang in future. So development work is expected to begin next year (2023). So after one (1) year of process, it is expected that in 2024 Ampang Look Out Point will reopen to the public. Thank you.
Semenyih.
Thank you, Mr Speaker. My question is number 153.
Oral Questions — 153. Budget EstimatesQuestions
153. To ask the Y.A.B. Dato' Menteri Besar:-
a)
To what extent has the budget of the Selangor State Government been spent for development purposes for the year 2022?
b)
State the total by department or in each DUN that has been spent.
Thank you, Semenyih, Speaker, for the question raised. The Selangor State Government tabled the 2022 Budget on 26 November 2021 with a Development Allocation totalling RM 1,123,000,000.00. Based on performance up to 31 October 2022, the allocation spent is 65.38%, equivalent to RM 734,227,805.93. The Development Allocation of RM 1,123,000,000.00 is distributed to 9 departments, where the Office of the Menteri Besar and the State Secretary (SUK) have spent 68.21%.
For the State Treasury, nothing has been spent so far because its allocation is rather low, around RM 180,000.00 only. For the Agriculture Office, the allocation has been spent 34%, Forestry 51%, Public Works Department (JKR) 51.63%, Irrigation and Drainage Department 46.53%, Islamic Religious Department 41.42%, Town and Rural Planning Department 47.37%, Veterinary Services Department 17.66%, and overall it is 65.38%. Although this performance is seen as low spending, the State Government is confident in our previous track record, especially for the last two months of 2022, when we will be able to achieve 90% based on the spending trend of previous years, because part of this financial usage will only be settled when a project, or a programme, or a task, or an implementation is carried out.
For information too, the State Government does not have data on development allocations by DUN, because most allocations, except the people-friendly allocations, are made based on programmes or projects, and those programmes and projects span across world boundaries. Although we are only at 65% as of October, I presented during the previous budget that it had increased to nearly 70%, and I believe the spending trend can be completed because the projects are ongoing and some of them we can complete. Thank you.
Soalan tambahan.
Semenyih.
Thank you, Y.A.B. Dato' Menteri Besar, for this explanation, but Semenyih would like certainty on whether, in the event of emergency cases, the State will, for example, where allocations have been fully used, such as landslides, floods and so on that occur towards the end of this year. Is the State Government, is it prepared with an emergency budget?
Thank you, Honourable Member. That is what we did for the flood incident last year, 2021. For last year's floods, for household assistance that we announced alone, we spent RM 132,000,000.00, and if we followed the 2021 budget, it was not enough. That is why last March I tabled supplementary expenditure.
The supplementary expenditure covered about RM 31 million, if I am not mistaken, to repair the collapsed slopes in the Hulu Langat district and also to repair the collapsed river banks. Altogether, we spent nearly RM 180 million through supplementary expenditure. The supplementary expenditure was made together with the expenditure already incurred. Alhamdulillah, we have savings, several savings such as the Selangor State Heritage Fund (Tabung Warisan Negeri Selangor). In that Heritage Fund we have sufficient allocation. I think the last time I looked at the account, it was nearly RM 700 million, and we can withdraw and use it, but it can only be used for certain trust builds with certain priorities, not as we please.
can use that fund for its long-term plan, for the State of Selangor if faced with certain challenges. That fund only.
That does not include the fact that we can liquidate some assets, we can liquidate some shares, and we can also use the existing cash, as now we have cash of around RM 300 to RM 400 million that we can use at the beginning of next year.
Soalan tambahan.
Silakan.
Thank you, Mr Speaker. For the information of the Most Honourable Menteri Besar, a new case happened last week and a day or two ago, where a road collapsed. There was a landslide at Batu 3 towards Batu 5 Bangi. So what was informed by the District Land Office is that there is no allocation, involving the Public Works Department (JKR), and so on. So I think the State Government can consider this, because the route was changed, so at Batu 3 the village road, when heavy vehicles pass, the villagers protest, not allowing their roads in Kampung Batu 3 to be damaged. There have been protests boycotting this main route.
So I think the State Government needs to take this matter seriously, on the grounds that the District Office informed me that if the Honourable Member has a project, the Honourable Member has a little project money, use that project. For me there is no problem for community development. When we use small projects to help the traffic problems in Semenyih Batu 3 here. Thank you.
I have to get information from the District Land Office. There indeed is none, but several Municipal Councils, for example Selayang Municipal Council, we helped more than RM 6 million to RM 7 million for landslide areas. And Ampang Jaya Municipal Council, we helped for landslides, and we hope Kajang Municipal Council or the Hulu Langat Land and District Office needs to table it at the Economic Action Council. Admittedly, previously we did not have an Economic Action Council because of the space needed for the election process. The DOs and our service officers also served as returning officers, and now the House is sitting after the election is over, and after this we may hear for feedback. So far the State Government is able to use, or the Council parties themselves can use the existing savings before being replaced by the State Government administration. Thank you.
Hulu Kelang
Mr Speaker, my question is number 154.
Oral Questions — 154. RM1 Billion SuitQuestions
154. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What is the government's stance and action regarding the steps that will be taken by certain parties to sue the government for RM1 billion over the Bukit Lagong Forest Reserve case?
Mr Speaker, for now there is no party that has filed any legal action in court against the State Government as in the case mentioned. Nevertheless, if there are any parties who file a claim against the State Government, then the burden of proof lies with the claimant to prove it and it is not based on assumption or allegation alone.
On the part of the Selangor State Government, all decisions made under the powers of the State Government are made transparently, complying with all established processes and procedures, and based on the prevailing law. The State Government, through the Selangor State Forestry Department, is always committed to managing and developing forest resources sustainably and optimising their contribution to the socio-economic development of the state and the nation.
Soalan tambahan.
Please, Hulu Kelang.
This issue has dragged on for a long time. Sungai Tua also took part. Please explain to me personally. The one who made the allegation is a friend. Our friend, I think he is a Pejuang. If he is a Pejuang, I give one mark, certainly for him to qualify to determine what is stated. When it goes too far, I also do not like it. I do not like issues like forests, reformists, party presidents... if we can resolve it, if we can,
EXCO who knows the role of the Government should resolve it, so it does not spread to the party and so on. Thank you.
The Honourable Member for Hulu Kelang, we also do not know how to resolve this issue. They do not accept the facts that we give them. So they only make assumptions. We do everything based on the existing reports and also the existing Acts. So we follow the procedures. I also do not know how, if they do not accept our statement or our facts.
We'll settle it...
Hulu Kelang is done. Okay, please, Bukit Lanjan.
Thank you, Mr Speaker. My question on ESG and GLCs in the State of Selangor is question 155.
Oral Questions — 155. ESG and GLC of Selangor StateQuestions
155. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What actions will be taken to ensure that all Selangor GLCs have an ESG Board (Social and Environmental Governance Committee), which aims to support the State Government's commitment to the environment, corporate governance and sustainability?
Thank you. MBI Selangor has updated the organisation's vision by taking into account the elements of social, environmental and economic sustainability in supporting the State Government's commitment to strengthening corporate governance. MBI has established the following policies, which also serve as compliance with Section 17A of the MACC Act 2018:
i. Code of Work Ethics and Conduct Policy ii. Anti-Bribery and Misconduct Policy iii. Business Ethics Code Policy iv. Conflict of Interest Policy v. Gifts Acceptance and Giving Policy
vi. Whistleblower Policy vii. Risk Management Policy
MBI is also in the process of developing the Organisation Anti-Corruption Plan (Organization Anti Corrupt Plan) as stipulated in the directive of the Most Honourable Prime Minister No. 1 of 2018, Series No. 2, No. 1 of 2019. Honourable Members whom I love all, in the meantime we are also active in ensuring that matters other than accountability or management are also related to the environment. The management of the environment is certainly something we want to apply to some of our projects in close cooperation with several subsidiaries. Among the subsidiaries that are now actively cooperating and exploring the environment field at federal level, as an environmental company, is Petronas. And they need ESG ratings like this, and we are ready to work with them to ensure the ESG values, or the environmental values, that are enshrined in governance, and also governance and social. And also this environment can be applied in the management of the State Government's subsidiaries. But for the governance aspect that I have explained, the environmental and social strategy, we already have our CSR. In our CSR we have networks, plans and programmes from early intervention all the way to educational assistance and places of worship. But for this environment part, frankly we need feedback and support from the climate change committee and also from other bodies on how we can bring it closer so that it is more holistic. Sometimes people take the environment in a light concept. There are several companies, for example those in contact with me, including Nestle, I inform you. It is not a State Government company. It has covered more than 10,000 houses for recycling programmes, and has gone around several districts. So, this may be the understanding and challenge that our subsidiaries must undertake, especially in ensuring that the E value, or environment, can be finalised and implemented. Apart from contributing to tree-planting programmes, which is indeed done by our subsidiaries in large numbers, and the number of trees we planted also has a certain number. I think the EXCO has more detailed figures. Thank you.
Supplementary question, Mr Speaker.
Bukit Lanjan.
Thank you, Dato' Menteri Besar, for the explanation on ESG programmes or the steps that will be taken by GLCs in the State of Selangor. My supplementary question is, apart from environmental and also governance, where Dato' Menteri Besar has indeed listed various initiatives that will be carried out or have been carried out, there is also S, namely social. So, this social aspect includes the representation of
women in GLCs, especially in management, administration and also inclusivity, namely for example. Perhaps various races or persons with disabilities (OKU) and so on. What steps will be taken by MBI so that this S aspect, this social aspect, can be addressed as well as possible in the ESG effort across all GLCs?
Programmes such as gender equality or gender balance are among the matters that have been given emphasis, especially what has been done by the EXCO for Women's Affairs, Seri Serdang, recently. Gender mainstreaming programmes, in other words, are gender balance within or the balance of gender within our subsidiaries. Moreover, we are proud that several major state subsidiaries, for example Worldwide Holdings, are led by a woman. In fact, MBI itself has a female CEO. So, we do not only look at numbers, whether coded or uncoded, but we must also place emphasis on quality. Quality is also important. If we only take numbers and do not compare with qualitative aspects, eventually we will make unbalanced numbers. Everything that is placed is in support roles only. We see the State Public Library Corporation, for a long time since 2008, 2009, has been led by a woman. And this is one example of how I mentioned that gender mainstreaming cannot only focus on the number aspect, but must also look at the quality aspect with certain scoring, so that if we place a CEO, the value is equal to 50, 60, perhaps 100 additional support workers below. But if that additional worker is one, the value is certainly only 1/10 of what is above. So, this balance aspect is not that we follow numbers, but it is measured by qualitative aspects, and we have implemented it, we have implemented it at the standco level, we with the State Sports Council as an example, not forgetting our subsidiaries, to see whether this gender inequality can be eliminated. Thank you.
Bukit Gasing.
Thank you. Can the State Government publish a sustainability report, with permission, as is done by various large companies, so MBI may be able to take the lead in publishing this sustainability report showing not only the environment but also S and G, and we can look at the specifics and more, we can argue more meaningfully than now, when we only talk about concepts because there are no details.
Yes, Bukit Gasing. I think that is a good suggestion. Perhaps this is among the important values and it will actually provide additional rating for credit, additional rating for quarters, additional rating for banking, because banking now does take ESG value to some extent as added value and adds value to the credit capacity rating of these subsidiaries. I will consider it. We may be able to look at
public reporting on the ESG achievements of our companies and subsidiaries by looking at ESG aspects. Thank you.
Sungai Panjang.
Thank you, Honourable Member, Mr Speaker. My question is number 156.
Oral Questions — 156. Selangor Smart Agro Park (SSAP)Questions
156. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What is the latest status regarding the approval of the EIA?
b)
When is the SSAP development expected to restart at the site?
c)
What is the latest number of participating companies, and please state it?
Thank you, Honourable Sungai Panjang. Honourable Mr Speaker, the Honourable Sungai Panjang asked a question regarding the implementation of the Selangor Smart Agro Park. This actually refers to SSAP @Changkat Menteri in Sabak Bernam. For the information of the Honourable Member, at present the party has submitted the Terms of Reference (TOR) for the Environmental Impact Assessment (EIA) report on the environment under Schedule 2 to the Putrajaya Department of Environment (JAS). However, the TOR could not be endorsed by the Putrajaya Department of Environment because of objections from an NGO, namely GEC, which stated that the area is not suitable for development with food security crops and requested that several important studies be carried out over a long and comprehensive period, such as soil studies, wildlife studies and groundwater studies, before the proposed project can be endorsed or approved by JAS. We find that these studies require a long period, nearly a year, by the consultants, and will be carried out and are in progress, and this will cause delays in obtaining approval for the EIA and, in turn, affect the implementation of the SSAP project, so the minister says. Based on the current status, the project is expected to commence at the end of 2023, subject to the relevant EIA approval, and will be implemented only once the EIA approval under Schedule Two has been confirmed, only then can this project be planned. So, we estimate the end of 2023. At present, PKPS has shortlisted 10 participants who have experience and financial capability in the agricultural field, and these 10 are the ones I can mention here.
Thank you.
Soalan tambahan.
Sungai Panjang.
Thank you, Honourable Mr Speaker. Thank you to the Honourable EXCO member for the answer. Just recently in that area, especially in Belialah, flooding has occurred when heavy rain hits. So, based on the observations or preliminary analysis of the Government, is the flooding, which never used to happen, caused by the clearing or land clearance at the SSAP site? Thank you.
NO COMPANY NAME 1 Geomining Industries (M) Sdn Bhd
2 Sri Lagong Agriculture Corridor Sdn Bhd
3 Top Fruits Sdn Bhd
4 Agro Harvest Plantations (Serasi Hijau Sdn Bhd)
5 Oscar Making Sdn Bhd
6 Prima Agung Sdn Bhd
7 Macamatch Sdn Bhd
8 Grasigate Berhad
9 Astana Consolidated Sdn Bhd
10 Petrogas Resources Sdn Bhd
We have not received any report that the cause is SSAP. In fact, there is still no large-scale work in this area. What has been done is only the clearing of access roads and the initial site, the main site only. Other works are not permitted, whatever the original works were, only the initial opening work at the start. Other works are not permitted until this EIA approval is received. So, what work is there, if any, in terms of what is done to maintain the roads so that they do not get damaged, that is all. Other works are not permitted. So, I will look into whether the permission is related to this flooding, whether it is caused by this area's clearing? Thank you.
Pandamaran.
Mr Speaker, my question is 157.
Oral Questions — 157. I-SeedQuestions
157. To ask the Right Honourable Dato' Menteri Besar:-
a)
State the total allocation approved for the I-Seed programme.
b)
Is I-Seed open to races other than Indians?
For the information of the Honourable Pandamaran, the Indian community in this state has never been marginalised or left behind by the State Government. The State Government is also aware that the Indian community needs to be given serious attention to be assisted in a more focused and comprehensive manner in efforts to improve their socio-economic status. One way is by providing extensive exposure to empowerment programmes in the fields of entrepreneurship and skills to produce highly skilled individuals and to enhance existing capabilities. In this regard, the total allocation approved for the i-SEED programme in 2021 was RM 1.5 million, while in 2022 it was RM 1.3 million.
Among the programmes or activities that have been implemented are the Selangor Indian Entrepreneurs Equipment Assistance Programme, namely the provision of machinery or equipment assistance, as well as the organisation of courses, workshops and training in theory and practice, in an effort to help improve the knowledge, skills and entrepreneurial communication of the Indian community, especially recipients of i-SEED assistance.
Accordingly, in 2021, a total of RM 1,146,070.00 was spent on the Selangor Indian Entrepreneurs Equipment Assistance Programme, with 254 recipients of assistance successfully approved. The i-SEED training programmes, conferences, seminars and workshops had to be postponed due to constraints on holding social gatherings during the Covid-19 pandemic. The funds allocated for implementing these programmes were used for the provision of business equipment assistance to Indian entrepreneurs.
In this regard, in 2022, a total of RM 1,015,840.00 was spent on the purchase of equipment and machinery for 211 recipients. Meanwhile, RM 56,080.00 was spent on organising courses and training, namely the Start Up Programme Specifically for Indian Entrepreneurs from the B40 Group and the Entrepreneurship Training Programme Specifically for Youths, in an effort to become dynamic entrepreneurs. Besides that, the i-SEED Entrepreneurs Carnival was also held from 7 to 9 October last year at Dataran MPK @Padang Chetty, Klang, with more than 30,000 visitors, with the expenditure totalling RM 430,000.00. Therefore, overall, the allocation of RM 1.3 million in 2022 was successfully spent optimally at 100% up to October 2022.
For the information of the Honourable Member, the programmes under the i-SEED unit are implemented exclusively for the Indian community only. This is because we are aware that the Indian community needs extensive exposure to empowerment programmes to produce highly skilled individuals and create new entrepreneurs so as to enhance existing entrepreneurial capabilities, in line with the vision and mission of Iltizam Selangor Penyayang as taken up by the Right Honourable Menteri Besar.
Thank you, Honourable Kota Kemuning. Honourable Members, the time has reached 11.30 a.m. I hereby adjourn the question session for the next business.
Continuation of Motion No. 15 of 2022. Motion on Development Allocation 2023Motion
The next item on the Order of Business is the continuation of Motion No. 15 of 2022. Motion on Development Allocation 2023.
Honourable Bukit Lanjan, please proceed.
Thank you, Mr Speaker. I am continuing my debate with several points, and for the information of all Honourable Members, I will focus only on P01 Office of the Menteri Besar and State Secretary. On Friday afternoon I began my debate on PK4, Social 040002 Development of Orang Asli Affairs. Page 197, where I asked the State Government what type of development is usually requested by the village representatives of Orang Asli in the State of Selangor. I feel this data is very interesting for everyone, because with this data we can also plan what type of development needs to be implemented in all Orang Asli villages in the State of Selangor. One issue that I want to raise again in this august House concerns the compensation that should be received by the residents of the Orang Asli village of Desa Temuan in my area. Last year, I raised an issue here regarding compensation that they have not received for the past 30 years. Their agreement from 30 years ago, they only received part of the compensation. So several issues such as the handing over of their customary hall, their open field, several plots of land that were promised, plots of farm land, orchards, strata units and so on, have all not yet been resolved. I hope the State Government can set up a task force, a special committee, so that this matter can be expedited. I have already sent a letter to the Office of the Honourable Kajang a few months ago, together with a set of agreements compiled by the village representatives of Orang Asli Desa Temuan. I hope the State Government will take this issue seriously so that it does not drag on after the sitting of this House.
Mr Speaker, I refer to page 198, PK5 Education, Project Code 05002. I have a question for the State Government: does the State Government still provide subsidies to Universiti Selangor, which is a university under the State Government or GLC? And I have a suggestion that the State Government could, if possible, increase the university entrance grant for our students. If I am not mistaken, RM1000.00 for the university entrance grant was set by us, I think, 12 years ago, in 2008-2009. So I feel that with the increase in the prices of goods and so on, a more reasonable grant, I think RM1,500.00, would be a better figure for our students entering university. Mr Speaker, I now refer to PK7 Youth and Sports, on the same page, under project code 07002, upgrading and building new sports infrastructure. I would like to propose that the State Government look again at how we can attract the attention and interest of young people. We have heard various complaints from young people, especially during the recent general election, particularly in areas where I feel they do not have enough sports infrastructure. Among the sports I would like to propose, not new sports but perhaps a phenomenon that is becoming increasingly popular, is
Skateboarding. I hope the State Government will take note that skateboarding is a sport that is easy to equip, can be played anywhere, and if we want to build a skate park, the cost is also not too heavy or large. I suggest that the State Government look at this matter regarding project code 07003 in the same PK7, namely sports development, as our sports were tested through SUKMA this year. And I feel the results of SUKMA by Team Selangor can still be improved. I hope the State Government can focus on sports development, because in sports we cannot obtain sporting talent or good results overnight, with respect. This does not happen within a year or two, but a sports development system must be implemented and sufficient funds must be given to the athletes of the State of Selangor.
Mr Speaker, I refer to PK9 Municipalities under project code 09002. This concerns roads that must be built by local authorities (PBT), but some PBTs do not have sufficient allocations. I take note of this esteemed House and also the relevant EXCO, where in my area there are two roads that Majlis Perbandaran Selayang has long applied for assistance to build, because the allocation for these is quite large. So they say that there is not enough allocation for these at MPS. The first is the construction of a second road from Laman Sieramas leading to Hospital Sungai Buloh, where the project planning is complete and now they are only waiting for the State Government to kindly release the allocation. I request consideration from the Dato Menteri Besar or the relevant EXCO to look into this matter, because this area has only one access road in and out. This second road is very important so that if a disaster or catastrophe occurs, they have a way to exit the area. The second road for which I request the State Government to assist Majlis Perbandaran Selayang is the upgrading and widening from two lanes to four lanes at Persiaran KIP 2, Wangsa Permai. So I have also written a letter to the State Government, and I hope this can be considered under PK9 Municipalities.
Mr Speaker, I refer to page 200, PK14 Libraries, project code 14018, IT Infrastructure Development Project, where RM 140,000 has been allocated. My question for the PPAS library and also the relevant EXCO is why, in this modern age, the era of IT and so on, our books still, with respect, do not yet have a digital library. I feel that with tablets, smartphones and so on, especially for our young people, they prefer to read using smartphones, tablets or computers. I hope the State Government can take care of how we can include more books in a digital library. There is one NGO that I feel is very interesting in Malaysia, called digital archives, if I am not mistaken. They collect all the historical books, scan them and upload them. They upload them to the internet so that everyone, not only in Kuala Lumpur but throughout Malaysia and overseas, can access these books.
I hope the State Government can take this example and implement it quickly.
Mr Speaker, my final question is on page 201, PK17 State Special Projects, under project code 17005, Taman Rakyat. The total amount that should be allocated for this project is RM 40 million. But as last year, this year too only RM 10 is placed for next year. I want to know what the vision or future plans for Taman Rakyat are. Because at that time, when we discussed Taman Rakyat, I was still in EXCO, and there was a very beautiful design. There was a children's park, and recently I attended a programme called TUKANG. TUKANG is a handicraft event organised by Tourism Selangor and also the EXCO for Tourism. I walked around the Shah Alam lake area, Laman Galeri Shah Alam and so on, and I saw that the area is very beautiful and has great potential, but perhaps we need some improvement in promotion and also perhaps some new infrastructure to attract visitors to Shah Alam, especially to Taman Rakyat or the parks we have in Shah Alam. So that is my question for the State Government. I once again extend my thousand congratulations to the State Government because the 2023 Budget is a very, very good one, and especially for development in the State of Selangor, we hope the State Government can implement as quickly as possible the various projects that have been listed in the Selangor Budget book. Mr Speaker, I support this Motion.
I invite the Honourable Subang Jaya to speak.
Thank you, Mr Deputy Speaker. Subang Jaya wishes to raise two matters. The first is under Vote P13, namely the Development Allocation of JPS (Irrigation and Drainage Department). The first, on page 231 under project code 01300, is the development of the Klang river basin flood mitigation project. The second, on page 234 under project code 02100, is the item to build and upgrade drainage. Subang Jaya wishes to ask about two projects in the Subang Jaya state constituency (DUN). First, I wish to congratulate the ADUN (state assemblymen) whose areas will have projects implemented to address the flood issue. But I see here that projects in Subang Jaya have not been included. For information, in December 2019 and also March 2020, flooding occurred in Subang Jaya in the USJ 1 area near the One Avenue apartments. In USJ 1, involving the industrial area, the flooding was caused by water that could not be discharged into the Sungai Klang, and also by the very high water level of the Sungai Klang. So the solution discussed at that time was to build an onsite detention pond, or OSD, at Jalan Industri USJ1/2. Next, for the One Avenue area, in both flood incidents the dividing wall of the apartment area leaked and also collapsed. This was caused by the high river water level, which exerted high pressure on the wall. So the solution also discussed with JPS and the district office was to build a sheet pile. So, at the previous sitting of the House, Subang Jaya asked about the plan to build this sheet pile, and it was said there was a plan to include it in the budget for 2023.
However, when Subang Jaya checked this Budget, this project was not included. So, Subang Jaya wishes to ask: for the OSD at Jalan Industri USJ 1/2, and next for the sheet pile at Pangsapuri One Avenue, what is the plan? For Subang Jaya, we have met the EXCO, have written letters to the Office of Dato' Menteri Besar, have met the Irrigation and Drainage Department which also submitted a report, have met the Council, and have also raised it at the District Office. So we are only waiting for this Budget to include these two (2) projects, so that we can overcome this flood-prone area. For the information of the Honourable Members, this area has been blacklisted by insurers, which means insurance companies also have no interest in providing insurance to that industrial area. So they can only depend on assistance from the State Government.
For the next issue, Subang Jaya wishes to raise that Vote P01, namely the Allocation of the Office of the Menteri Besar and the State Secretary, on page 200 under Project Codes 10, 1600001 to 1600007, is the development of Air Selangor projects. I wish to congratulate the State Government on its efforts in recent years. I see efforts to build the Labohan Dagang, RASAU and also SJAM. And honestly, Subang Jaya sees results from these efforts, in that stoppages at the water treatment plants have also been drastically reduced. But I see here that the State Government can work very hard, but its communication also needs to be improved. This is because if communication is not carefully observed, it can also thwart the State Government's efforts, or, if implemented well, make them successful. Subang Jaya wishes to refer to the incident last Friday in which the Sungai Semenyih water treatment plant stopped operating at 1.00 am. But although the State Government successfully handled this problem within four (4) hours, and water began to be distributed at 3.00 am, the communication issue was not dealt with properly. So residents in the affected areas woke up to an SMS sent to their handphones saying the water treatment plant had stopped operating. So panic broke out among the community. Therefore, I hope this matter will be looked at. Indeed, in that incident the water had been distributed at 3.00 am, but the apps were not updated at 8.00 am. When I checked at 9.00 am, it still had not been updated. By 10.00 am, when the Air Selangor office and the relevant departments should have arrived at the office, it still had not been updated. Not only should they have cancelled the message that had been entered in the Air Selangor apps, but they also should have resent a message via SMS to inform residents that the water had been distributed at 3.00 am. Just now, our residents saw the efforts of the Selangor State Government, which takes this issue seriously, and apart from that
also can see that the State Government has worked very seriously. Within four (4) hours it handled this issue, and there was no prolonged stoppage that led to water disruption. So, I hope this matter is looked at carefully and seriously, because otherwise the efforts of the Selangor State Government will be wasted. So, that is all from Subang Jaya. Thank you.
The Honourable Member for Sijangkang is invited to speak.
Thank you, Mr Deputy Speaker, for giving me the opportunity to take part in the debate on the Development Allocation Budget Motion 2023. There are several matters I wish to put forward in this debate. Firstly, I refer to page 197, PK2 Rural 02001 Agriculture, 02002 Socio-Economic Development and 02003 Traditional Village Economic Development. I see that, in the current climate of climate change, especially in terms of food security, this is an important matter. It involves rural areas where I believe there is still a large amount of land available for agricultural development, which is very important. For this reason, I see that efforts under agriculture, plantation and agro-industry development require a fairly large allocation, and programmes involving the people, or residents of rural areas, in helping to increase agricultural produce, especially perhaps in the form of vegetables, kitchen gardens and so on, must be emphasised.
Secondly, relating to Socio-Economic Development, which is under 02002, I see that in rural areas, especially in boosting the income or socio-economy of rural communities, particularly those involved in night market and morning market programmes, yes, rural areas. I need to see that the State Government looks at several suitable sites for morning markets or night markets, perhaps as is common practice today, where night markets are held along roads, which may disrupt traffic, and the suitability of the place for holding a night market. I see, yes, that it can be seen by the Government, which looks at sites more suitable for markets or trading plazas. I believe that previously there were efforts that were made and succeeded in establishing a trading plaza site in every district in several DUNs in the State of Selangor, which I believe should be continued, especially in managing night market programmes and also in waste management and so on.
Thirdly, it is also related to the development of protein sources, yes, especially in these rural areas. I see that if in my area, or in Kuala Langat, there are several sites, for example,
prawn ponds located in river reserves and along riverbanks, which I believe the State Government can look at again regarding the approvals given to those who have been operating prawn ponds, for example as in Jugra and so on. I believe approvals can be looked at in terms of using temporary occupation licences so that they can continue to operate while also generating income for them and meeting the need for protein sources in our country or in the State of Selangor itself. The next matter concerns 02006, Upgrading and Repair of Rural Roads, as I also mentioned earlier this morning, concerning faded paint on the speed humps. I see today that some parts of the village areas have also been built with many speed humps, especially at junctions. Some of them have no lighting. I think that is good, but sometimes when the paint fades it can cause accidents. Perhaps it can be looked at, at the State Government level, as to which is more suitable. The speed humps built are sometimes of various sizes, and sometimes are very dangerous. Too high or too narrow, and too high, which can also cause danger to vehicles, and I am not sure whether, in terms of the speed breaker or thicker paint, one is more suitable, or in the form of a hump of a poly nature, yes, that is more suitable. I think the State Government should also look at this matter.
Then, on the same page, PK4, Social 04009 Halal Industry. I believe that previously the State Government, and today also the State Government, has organised programmes to generate more services through Halal International Selangor, producing Halal Technical Computer Persons, Executive Halal Auditors, Halal Professionals. I do not know how far, up to today, how many we have produced, and I see that in the State of Selangor, the universities in the State of Selangor can also hold programmes like these so that employability, for example, Universiti Islam Antarabangsa Selangor, yes, holds this programme, and can add value to the employability of graduates, students, especially the children of the State of Selangor itself. Then, page 198, PK5 Education. Thank you to the State Government for creating the BAYU (Basic University Fee Payment) programme. However, I see that recently, perhaps due to the hardship faced by people in our country because of Covid and so on, job losses and so on, the number of children entering university who come to the Community Service Centre needs initial financial resources to enter university, in terms of their need to pay early fees, and needs for various other things. I believe this too may be looked at by the State Government before they enter university, after being accepted, and to ensure they will enter university, early contributions can also be given to ease their entry into university, because some of them are unable to provide the necessary
allocation, which ultimately means they cannot continue their education at university or higher institutions.
Next, page 199 concerns PK10 Tourism. I see that in Kuala Langat there is a bridge connecting the Sijangkang state constituency to the Morib state constituency, the Kampung Sawah bridge, which, as far as I know, does not yet have a name. I believe that in the Morib state constituency there are many areas that are tourist areas, areas that have historical value. If this bridge could be beautified further and given a name, perhaps in the name of the Royal Institutions and so on, I believe this may also add another lustre to enhance tourism in Kuala Langat. Next, PK12 Environment, Environmental Programme. I see that the State Government's efforts to plant trees, perhaps not in this, in forestry, but I believe the State Government's efforts to plant 320,000 trees so far, with a target of 1,000,000 trees by 2025, are a very good effort. However, for me, I still see the ROI: what is the number of trees that we can actually plant, whether forest trees or urban trees, or mangrove trees, because from my observation, when mangrove trees are planted, perhaps only around 50% to 60% will survive and some will die. For this reason, I believe that perhaps in our efforts to increase the number of trees that we plant and that survive, a study and perhaps a good solution can be looked at, so that ultimately the financial ROI we spend is commensurate with the results we expect.
PK13, page 199, 13001 Upgrading of Equipment of the Sultan Alam Shah Museum, which I believe, even up to today, this museum has still not been opened. I can inform you that it has been almost a term, I believe, so what is the status of the repair or upgrading works taking place there, and what is the reason why, up to today, the Sultan Alam Shah Museum still has not been opened. Then there is the matter on page 219, PK101400 Non-Physical Project, JD Kuala Langat, Installation of Traffic Lights, Street Lights, Improvement of Road Safety Aspects. So, I still hope that the installation of these lights is not only on the main roads but also on village roads, so that the lighting is better, and some main roads, especially roads that are popular choices, such as the road from FT5 to Jenjarom and Jalan Kebun, Jalan Batu 9 Kebun Baru, this lighting needs to be improved because the number of vehicles passing is increasing and they are exposed to accidents at peak times and at certain times.
Next, I wish to refer to page 233, PK10151 Sijangkang River Flood Mooring Plan. I hope the Government can give some detailing of the Sijangkang River Flood Mooring Plan, which costs RM 2 million. Where is it? The plan, and what is the plan for
resolving the flood mooring allocated in Sijangkang. Then, finally, page 253, PK1101001. I do not deny that any development sometimes will cause impacts on the people and existing structures, and I hope that whatever is planned takes into account all the important matters, especially when it involves residents. I still receive information that seems as if people are not satisfied, especially regarding the development that involves Taman Kencana in the Pandan Indah area and the EXCO's own area. I am not sure whether they have received correct information or not. And what may actually happen, because if we look at it, it will involve part of the residential area, and if possible, it can be looked at again, perhaps the alignment can be relocated. And with this, the matter still reaches me as if it is still not resolved, and I am not sure whether the explanation has not reached the residents, or perhaps there are certain plans. So I think that is all for now, from Sijangkang, and I thank the Deputy Speaker.
I invite Kampung Tunku.
Thank you, Mr Deputy Speaker. I want to refer to several matters. The first issue is under the Office of the Menteri Besar and State Secretary, on page 197, Project Code PK101003, Smart Selangor Initiative. In my view, the Smart Selangor Initiative of the Selangor State Government is quite robust and its programmes are quite comprehensive. However, I would like to touch on the dissemination of information, especially regarding the secondary initiatives, or secondary, for example, if we consider initiatives such as the primary or flat sheet, with permission, we can say the programmes such as Skim Mesra Usia Emas and Iltizam Sihat Selangor are programmes that are known to many Selangor residents, but there are additional initiatives like INSAN, which I think need improvement in the dissemination of information and details on how Selangor residents can apply. For example, last year, I believe 2020, the Selangor State Government developed the SSIPR System. However, I see that although it was developed as a one-stop centre for Selangor residents to obtain information on all Selangor welfare schemes, its usage or utilisation rate among Selangor residents is still not very high. Therefore, I would like to ask the Selangor State Government: since the launch of the SSIPR website, how many registered users have used the website or SSIPR to register for the Selangor State Government schemes?
Second, I would like to propose that the SSIPR website also include new schemes or initiatives such as INSAN, as well as the free influenza and meningococcal vaccine initiatives, because, as the Honourable Member for Pelabuhan Klang mentioned in the previous debate, there are sometimes many other websites that contain information about the Selangor State Government schemes, for example
ecentral.com.my and bantuanrakyat.com.my. Their intentions may be good as they disseminate information, but the information is not updated on time, and sometimes it causes confusion, or they upload old, expired and inaccurate forms, which cause confusion among Selangor residents. Therefore, I propose that SSIPR must include all the initiatives and welfare schemes of the Selangor State Government from time to time. The second proposal to improve the dissemination of information is also that the Selangor State Government should really invest, with permission, in SEO, or with permission, Search Engine Optimization, because I found that when we use Google search, information from the Selangor State Government on the Selangor State Government schemes sometimes does not appear in the top results, with permission. For example, if we want to search for information from SelangorKini on Google search, it may appear in the sixth or seventh result on Google search. I also use INSAN as an example again: if the Honourable Member keys in INSAN in Google search, the top results will come from other websites such as bantuanrakyat.my, ecentral and perhaps news reports from SelangorKini, but Selangor residents cannot get a link that clearly shows how and where to register and what the requirements are.
So I think this Search Engine Optimization, with permission, is very important because it will be able to direct, with permission, Selangor residents to the most up-to-date information provided by the Selangor State Government. The second matter I wish to touch on is on page 198, Project Code PK7, Youth and Sports Development (07002), upgrading or building new sports infrastructure. In the previous sessions of the House, the Public Accounts Committee (JP-PAC) audited the Selangor State Sports Council and Darul Ehsan Facilities Management Sdn. Bhd., where, in general, sports facilities are placed under the administration or jurisdiction of DEFM, Darul Ehsan Facilities Management Sdn. Bhd. However, during site visits by the PAC, we also found that several sports facilities are under or assisted by a few subsidiaries, for example MBI. So, I hope that in upgrading or building new sports infrastructure, which is very much welcomed, the State Government can also establish a one-stop centre, with permission, for all sports infrastructure in Selangor. I also think that during SUKMA, we established a good model where local authorities such as MBSJ and MBPJ became foster parents to a sport, but I would like to propose that it be further enhanced so that it becomes a long-term commitment, and that subsidiaries are also encouraged or required to adopt a sport as a foster child.
The last matter I wish to touch on is on page 199, PK13, Project Code 13008, Establishment of Shah Alam Modern Art Galleries. Earlier, the Honourable Member for Bukit Lanjan touched on the festival craftsmen, with permission, held at the Shah Alam Gallery, where the Honourable Member for Bukit Lanjan and I myself visited, and I also agree with the Honourable Member for Bukit Lanjan that the Shah Alam Gallery is
beautiful but appears to be under-utilised, with permission, and I would like to propose that it be improved. We can also take inspiration from the Islamic Arts Museum Malaysia, located near Parliament, where the museum is arranged very beautifully and also serves as a venue for programmes, and also has a restaurant with quite delicious food, and a gift shop or souvenir shop that is very interesting, not only for Muslims or art lovers but also for non-Muslims. So, this is what I wanted to touch on. Thank you.
I call upon Hulu Kelang. Okay, I call upon Balakong.
Thank you, Mr Deputy Speaker. I wish to debate matters relating to page 197, Project Code PK4004008, Citizen Mindset Development Programme. In the 2023 development expenditure estimates, a total of RM 9.2 million was allocated for this programme. I would like further information under this programme: does it focus on political education, especially for young people and first-time voters? After the implementation of undi-18 and automatic voter registration, we can see what happened in the recent General Election. Although the implementation of undi-18 and automatic voter registration was a progressive step, the previous Federal Government did not debate it sufficiently to give adequate exposure to those voting for the first time. This caused many of them not to know the value of their votes and not to participate in the electoral process. Many were also attracted to the propaganda of the political parties that were responsible, and they were deceived into choosing political parties that are actually conservative, but using young, handsome and beautiful men and women as TikTok boys and girls. I am not a TikTok boy and girl, with permission. And they spread incorrect information. Selangor is a state with multiple races and religions. At the same time, we respect the way of life of every person, regardless of whether they are Muslim or non-Muslim, with permission. Nevertheless, I am very worried that these new voters who have just entered the world of politics are easily deceived by certain conservative parties and make choices based on propaganda, as they cannot distinguish whether it is true or not. Therefore, I feel it is very important for the Selangor Government to make an overall and effective plan under the Citizen Mindset Development programme to provide basic and sufficient political education to Selangor voters.
I also want to debate matters relating to pages 199 and 200, Project Code PK14, Libraries. I greatly welcome the government's efforts to allocate an estimated RM 9.6 million for the development or upgrading of libraries throughout Selangor. And I also share the same view as the Honourable Member for Bukit Lanjan, that I also propose the Government may allocate funds to establish online libraries or e-portals that give priority to digitising journals, theses or articles produced by our university students. These online libraries or e-portals, as online digital archives functioning as storage centres for scientific information and research collections at universities and higher learning institutions in Selangor, will facilitate research processes within our higher learning institutions. And the development process of our state will be carried out more quickly. Selangor is the most developed state, and we have the most universities and higher learning institutions in the state. We should and ought to be leaders of the education and research revolution in Malaysia. I very much hope that with these library facilities, more Selangor residents can conduct more research and become a catalyst for Selangor's progress.
Finally, I want to debate matters relating to page 257, Project Code PK404001, Animal Welfare Society, and on the same page, Project Code PK505002, Animal Welfare. These two sections are each allocated only RM 10.00. Stray animals, especially stray dogs, have become an issue that cannot be resolved, even though our society has reached such an advanced level. One of the challenges we face is that these stray animals continue to breed without end, because our country does not have any effective act or law to control pet owners in carrying out neuter operations for their pets. After these animals breed or are abandoned, they become stray animals. Although enacting acts or laws on this matter falls under the authority of the Federal Government, I believe the Selangor Government can also help in this matter by creating neuter incentives for pet owners and the public to encourage Selangor residents to bring their pets or stray animals that they always look after for neuter operations. Neuter operations are not cheap for a dog; the cost is between RM 250 and RM 300. And for a cat, the cost is between RM 100 and RM 150. If the Government can create an incentive that pays directly to veterinary clinics, we can reduce the price of these neuter operations and encourage more veterinary clinics to cooperate with the government. With this, I humbly support the motion. Thank you.
I call upon Ijok.
Thank you, Mr Deputy Speaker, and also Assalamualaikum W.B.T. to all Honourable Members and Heads of Departments. Today I wish to debate the allocation of the Office of the Menteri Besar and State Secretary of Selangor. It has many agencies. I wish to refer to
the Treasury on page 198, PK9, and also, in terms of the Environment, on page 199, PK12, and finally Water Supply on page 200, PK16. My debate is related to all agencies.
What is the use if all our allocations are there but, in terms of management, the way we benefit the community, what the community wants, is a healthy, comfortable and prosperous life? Ijok is of the view that in my constituency, Kuala Selangor has been upgraded to a municipality. The management is very, very disappointing. I want to give one story. This is a true story, a real story. A month or two ago in Ijok, many industrial areas, some halal and some haram. At one time not long ago, a factory was burning charcoal, and this is a major problem that pollutes the environment. This pollution can be in the air, soil and water, but this is air pollution.
The surrounding area was really angry, the residents were really angry because this burning was carried out at night. So the residents protested, and thankfully we also lodged a complaint with the Council, and the Council put up notices on the walls and doors, and it should not happen. But two or three days later, the burning still continued, which caused great anger among the residents because they could not sleep, and those with asthma had difficulty breathing. So they complained to the police, and the police said they could not do anything because this was an environmental problem. The problem is that the Department of Environment in Sabak Bernam, where air or water pollution often occurs in Ijok, I hope the Selangor State Government will consider moving this Environment office, even though it is from the Federal Government, closer to Kuala Selangor, because Kuala Selangor has been upgraded to a municipality.
Okay, so the residents and their leader attacked the factory, broke the doors and fought. The police came and arrested them, some were injured after being beaten, and the person who beat them has also been arrested by the police. And I, the one who was beaten, looked for a lawyer, I wanted to help them. This case was brought to court, and I told the lawyer, told the victim to come to court to give evidence because we want to know who gave the order to restart the burning. After that, the case was withdrawn.
What is very sad, Honourable Members, is that the perpetrator can say openly to the Village Head and the residents that this case has already been hushed up. This is what makes me very sad. Even though we give allocations, the management and enforcement are very weak. How can we overcome the public's perception of the Selangor State Government? So that is a case that just happened. I hope the Selangor State Government will review the management of the local authorities, which is indeed unsatisfactory. In my area, it is indeed unsatisfactory, and enforcement is also unsatisfactory. I remember in the past they said local authorities were under the Federal Government; now the Federal Government is under us, and we are under them. I hope that many departments previously under the Federal Government are no longer given excuses to say they cannot do anything, such as the Department of Environment, JPS, and local authorities. I hope this will be a reform to help the State Government move forward.
One more thing, I want to comment on this water. Indeed we are proud that Air Selangor has reduced non-revenue water. Is that a KPI for Air Selangor to reduce many other aspects that we want to know? Water quality is very important for the community. When I go abroad to developed countries, when I ask the hotel desk where the mineral water is, they say "don't worry sir, you can drink straight from the tap", with permission. I still remember in the past, when we were at school in the village, after playing football we all ran to the toilet and drank from the tap. I want to challenge Air Selangor: why is our water quality until now the lowest, not up to standard? I want to ask, in this House, whose house does not have a filter? I make sure every house has a filter, yes, why do we have to use filters, because some houses have two or three filters, the outside filter, the kitchen filter and the drinking filter. But poor people, the B14 group, who are pitiful, do not have filters. This is like education: rich people can go to private schools, poor people go to national schools with low quality. Poor people have to drink polluted water, rich people have clean water.
Is this fair? Water management is like my field of medical knowledge, where we have prevention and treatment. Prevention, recently we have done prevention, where is the enforcement by the agencies that look after water quality? In Ijok, sometimes, openly, factories release water that is green or black, so where is the enforcement? The Council, people say the Council is the Environment, like roads, also drains, everyone does not want to take responsibility, sir, so sir, who is responsible, who is accountable for this? In the past we said the Federal Environment, LUAS under the Federal Government, but now please, the water flowing to the plant reaches a level that cannot be shut down. That was in 2022, we can accept it.
One more thing, I want to ask about the existing plants. I know Sungai Rasau has a project that can clean minerals that half of the plant cannot do, maybe. I want to ask whether the methods used by these plants that are releasing now, can we accept them, why do we have to use filters? I think this is to deceive the people, you know, because there are many chemicals in our water, sometimes detected but cannot be cleaned. This is like water having two grades. So Ijok, I hope, Ijok hopes the Government will carefully look into the quality of this water, yes, it is very important because it causes health problems and other problems. So that is all Ijok wants to say, Ijok thanks you a thousand times, and Ijok supports the State Development Supply of Selangor.
I call upon Hulu Kelang.
Listen, okay. Alright. Bismillahirrahmanirrahim, thank you. I want to touch on three sub-heads of Head P12, the Selangor Public Works Department (JKR), from page 218 up to page 230. Then followed by P12 from the Drainage and Irrigation Department (JPS). In what is said to be page 230, then continuing up to 234 and 235.
And then go straight to PK2, PK4 and the third one, I will briefly touch on the concepts in department P14, the Selangor Islamic Religious Department (JAIS), one by one. First, I want to remind that the Selangor Public Works Department (JKR) is one branch of the Malaysia Public Works Department, which, in the past, if we were confused about the MRR2 road and federal-type infrastructure facilities, we were confused about the request we made. Under the state, they say it is not the state's, and they do not respond. Another habit: when we are right, or do not know what is right, they do not help, you know. This is a criticism from us, if they want to improve. If possible, we tell Selangor, if your officers are busy, tell us, we can help, because the State Legislative Assembly (DUN), when we design its work, helps the agencies that exist in the state. So we let the service provide services to the community and the public. Sometimes we do not know, they do not know what will happen. If there is no service from us in apps, we create simple apps, what numbers and so on, so that it does not continue endlessly. That is why, if you look at the electricity bill, or the water bill for the house we rent, the landlord's number is there, of course. If he buys the house second-hand from someone, the water bill is already there, the electricity bill is already there, but it is not settled. I mean, to change the electricity bill, you cannot do it many times. So our information is not tidy, whereas in modern Malaysian society it must be tidy there. When we do work, it must be smart, not working hard, with respect, but working smart. Okay, so I want to explain here that diversity must be regarded as a good thing, not a bad thing. So with that, I feel I want to emphasise here that the Public Works Department is the largest department, RM145 million, so the Drainage and Irrigation Department is small, RM58,000.00, the Islamic Religious Department RM65 million, RM25 million for JAIS. In the context of the Public Works Department (JKR), PK1 on page 219 states that the JKR physical and non-physical projects, installing street lights, road safety aspects and matters related to road furniture, I think. There is one programme implemented under Code PK1. Various road development project plans. I see this, if federal, Oh my God, my Lord, MRR2, I have complained several times, under the flyover there is rubbish for 10 years, there is debris, there are construction containers, materials not cleaned for 20 years. With this new Prime Minister, I feel I will ensure a good connection between federal agencies and every agency runs smoothly. No compromise. Our image is like shabby, you know, we do shabby work, we are not supposed to be shabby. If it is the road shoulder, if removing sand from the federal drain, state agency, you can see they have thrown the rubbish on the roadside, not removed for three months. After that, those who sell used cars, the roadsides are all not managed. So if we want a smart state, a smart city, we must indeed be clean. Okay, I stress that as I feel it is something we must do. So our system must be communication, we must communicate vertically, up and down, and horizontally, left and right. Only then
we go for X, Y, Z in the mathematical formula, we go for vertical or horizontal, only then can it be tidy. So I want to emphasise here that, lights... road development must be done well, and related to the allocation of RM5,000,000.00 for PK1 relating to non-physical matters, namely those relating to safety aspects such as traffic lights in residential areas, must be properly looked after, there are many accidents in such places. AU3, the accident site, one week if not once, twice. There are always people with broken legs and so on. So it is not acceptable, people must live safely, with respect. In the state administered and governed by Pakatan Harapan. Can? It must be possible. Okay, that is the first one, so I want to continue further with P12, namely Gombak, which connects Kampung Seri Indah with the kampung to the Sungai Buloh Hospital road, which we should do quickly, and another one that I want to vote on is on page 224, namely PK4, which is Upgrading Roads. So we upgrade road one, and secondly we upgrade the Missing Link, which is said to be project code 04205, namely the Missing Link. There is also something that happened in Hulu Klang, I don't know what to call it. We want the construction to do something else, it became the opening of a car wash, delayed for a long time. In the area of the Missing Link between AU3 and Wangsa Maju, Oh my God, my Lord, that... that land has been used by MPAJ to get side income. I am saying here, please check, please look. I am not speaking empty words, there is side income. I received that side income, they said there is an MPAJ receipt. Okay... if it is a receipt bought at a shop, I don't know who does the work, but what I know is that thing cannot be done. We do not want these unblessed things done, not right and not blessed. The aspect of corruption comes in, but sometimes there are restaurants, drink shops very close to the junction to enter the Gombak District Office road. That is side income for people who came there first. So we are not strict. When we want to be like Singapore, we cannot be, we do not have law-abiding citizens of the quality of Singapore, but people say, Singaporeans are law-abiding citizens only in Singapore. In Malaysia they sweep, they just throw rubbish. So we hope we provide that, we produce more law-abiding citizens. Work is also easy for us, and when we retire, becoming a State Assembly Member is also easy.
Okay, earlier I mentioned JPS. The matter is like this: pages 230 to 236 describe practical developments that can be carried out. I want to monitor, I have monitored JPS's performance a lot in terms of river deepening, river management, sand in rivers, river cleanliness, and there was a plan to clean residents' ponds at one time, but it did not happen, and that is one matter that can be considered. If it is indeed something that can be done. Then I want to explain here, I want to ask for an explanation, I want to ask what is meant by the Retrofit of the Udang River Drainage System, Mukim Batu, page 236, Project Code 02701, retrofit with a project cost of RM10,000,000.00, RMKE-12 Years 2021-2025, allocated and spent 6 million, and the state with a budget could add that allocation by setting the price at RM10.00. We can get an explanation in this debate, that would be good. And finally I want to express thanks to JAIS, which spent heavily in the context of developing
the sub-heads PK1, PK2, PK3, PK4 and PK5. Religious schools, Islamic Religious Offices, mosques, surau and various. I see here, I see there is some inconsistency with what His Royal Highness the Sultan of Selangor advised, that we must start all development planning for the State of Selangor based on the Shariah Council. The Shariah Council prioritises several matters. The Shariah Council emphasises which is primary, which is not primary. I see here in terms of our priorities, religious schooling does not involve non-Muslims, but we can go there, if we do good. Our programme problem, when we talk about schools, just barely schools can survive. If the good ones are private Islamic schools like Al-Amin, Al-Adni and so on, but if we look at schools like the projects here, there is none of that. However, for the school near Kemensah since I became ADUN, every year I have put on the agenda that it can open, no one dares come there, jammed, or P. Ramlee, that is Jalan Hulu Kelang, that is also okay.
Honourable Member for Hulu Klang, please summarise.
I want to propose here that the concept of using funds for the allocations of PK1, PK2, PK3, PK4 and PK5 must be done in a form that is truly based on the Shariah, namely that we put in place the principle of priority, where it is, because we are in education or administration, to satisfy ourselves, because we have beautiful mosques, good surau, many air-conditioners, we have ADUNs and Members of Parliament who can give funds, activities, management of many surau and mosques. If in Hulu Klang we have about 50 surau, we have about 10 mosques. That is, we want to add more mosques in Hulu Klang. Just now, I will give the names later. Frankly, I tell JAIS, that if we really look at our priorities, we make planning openly, organise properly, and with that we know what we call as the religious department, what its duties are, education or beautiful mosques, but open a little....
Alright, Hulu Kelang.
So I want us to discuss this matter. Next time, let us look at the balance figures, make them a bit more beautiful. There should not be a big gap between the Religious School which they placed there at RM16 million, compared with mosques and surau whose allocation is RM42 million. There is a big difference. So I hope after this there will be no dissatisfied people. Sorry if I am wrong, I apologise, if I am not wrong, I am taken into account so that we are not people who want to be proud of mosques just to make them beautiful, proud of their loud sound system, the azan can be heard by everyone, but no one wants to come. Thank you.
Thank you, Honourable Member for Hulu Kelang. Pelabuhan Klang, please.
Thank you, Mr Deputy Speaker. Pelabuhan Klang would also like to take part in the Selangor State Budget 2023 Development Expenditure Estimates. Thank you. Pelabuhan Klang would like to refer to page 218 of the Expenditure Estimates for the Selangor State Public Works Department (JKR), Subheads PK1 to PK5. The total estimated expenditure to be spent in 2023 is RM 145 million. This is a very large figure for the various programmes and development works: road development, building bridges and footbridges, building roads, upgrading roads, and building and upgrading development projects. Pelabuhan Klang hopes that this expenditure of RM 145 million will be spent well, will be managed well, and will achieve the targets set out in the Development Expenditure Estimates of the Selangor State Public Works Department (JKR) for 2023.
However, Pelabuhan Klang would like to ask: when we look at this figure of RM 145 million, I may not fully understand where the expenditure for maintenance and repair of damaged roads is. Is it under Operating Expenditure or under Development Expenditure? And for the road upgrading works, what are the roads to be upgraded, at RM 65,330,150,000.00? Since I see that many roads are to be upgraded, I am not sure whether the allocation is sufficient or not. As an example, I look at page 219, quote, the project I take as an example is 13160 Non-Physical Project, JKR Klang District, 01400 Non-Physical Project JKR Kuala Langat District. Looking at this, the project costs are all the same. RM 2.5 million, RM 2.5 million, RM 5 million, RM 5 million, RM 5 million, all seem the same across the districts and allocations. For example, quote 01301 installing street lights and traffic lights in Klang district, and likewise 01401 installing street lights and traffic lights in Kuala Langat district, RM 400 thousand. RM 400 thousand. So what is it that is to be installed for RM 400 thousand? And then quote 01302, likewise, if we follow the project cost it is RM 2,500,000,000.00, but the allocation is only RM 250,000.00. So I may not understand, or I think the Honourable Members may not understand, because everything is the same in every district. Everything is the same. So, surely everything cannot be the same, surely not all districts are the same, right? The required budget, there must be costs that, if calculated in detail, would certainly not be identical or exact in figures. And I request an explanation from the Selangor State Public Works Department (JKR) to clarify what a Non-Physical Project actually is, and what installing street lights and traffic lights actually entails. Because all the districts are the same.
And then Pelabuhan Klang would like to refer to page 224, project code 04304, which is the upgrading of State Road B148, Jalan Telok Gong from the Glenmarie Curve junction to the Jalan Ikan Tenggiri junction, Packages 1 and 2. The project cost is RM 128,830,000,000 and the estimate for 2023 is RM 8,500,000,000. Previously there was also an estimate for upgrading State Road B148 which was announced by the Yang Amat Berhormat Dato Menteri Besar in 2018, and until now I am still waiting to know what design the road to be built on B148 Telok Gong will have, from the Glenmarie Curve junction to the Jalan Ikan Tenggiri junction. This is because Jalan Telok Gong now has a lot of damage, there are many potholes, water pools, and many motorcycle accidents have occurred because riders hit potholes that were not repaired by the JKR.
And while waiting for these upgrading works to be carried out, what steps will the Selangor State Public Works Department (JKR) take to ensure the road surface on Jalan Telok Gong is in good condition, water does not pool, potholes are not present, and repairs are made immediately should road damage occur? And here too I also request an explanation of what exactly is to be spent RM 8,500,000,000 on for the upgrading of State Road B148 Jalan Telok Gong in 2023.
And on this occasion, Pelabuhan Klang would also like to propose to the Selangor State Public Works Department (JKR) that, currently, for the concession company responsible for road repair, maintenance and cleaning, only one company is operating, namely Kumpulan Semesta Sdn. Bhd., or what we call InfraSel. But since InfraSel took over from the previous contractor, the roads have not been maintained well. Roads are not repaired immediately when damage occurs, even though I lodged complaints directly with the office of the Director of the Selangor State Public Works Department (JKR). And even when we lodge complaints, only the complaint with the photograph is acted on, but the potholes near the pothole concerned are not patched and not repaired. And my hope and proposal to the Selangor State Government is that the maintenance, repair and cleaning of roads in Selangor, which are currently given only to Kumpulan Semesta Sdn. Bhd. or InfraSel, should be reconsidered. I would propose that another company be added so that there is competition. Otherwise, it is monopolised by one company, so it does not feel, as people say, challenged, so it does not care. And I hope that for the issue of potholed roads and damaged roads, they should not be turned into a business. If a hole is small, patch it while it is small. I wonder why they wait for the hole to become big before patching it. Because it is based on business: when it is small, it is not profitable, but when it is big, it is profitable. So that is why, if the concept of road repair is taken from the perspective of business profit, then we have a problem. The companies appointed must be based on public safety and the safety of road users. That is why I propose that the Selangor State Government appoint another company as a concession company to maintain, repair and clean roads in Selangor, in addition to the current company KSSB. Otherwise, there will be no competition and no challenge. Okay.
Next, Pelabuhan Klang would like to refer to page 230, which is the Selangor State Drainage and Irrigation Department (JPS). Pelabuhan Klang only wants to know what the flood mitigation project plans are in Klang district, because looking at page 232, quote project PK1 01311 Sungai Kembong Flood Mitigation Project, Pulau Indah, only this one is within the State Constituency of Pelabuhan Klang. Pelabuhan Klang wants to know whether there are plans to upgrade, now that climate change is occurring, flash floods happen frequently, and even outside the flood season the Pelabuhan Klang area floods, especially areas near the seashore. Although the sea tide is not high, because the rain is very heavy, that is what causes flash floods. In addition, there are projects that have been approved by the Klang Municipal Council (MPK), which previously did not take into account the short-term and long-term impact on the drainage systems within the Pelabuhan Klang area. Now many drainage systems are problematic in Kampung Telok Gong, as well as in Pulau Indah, including in the Kampung Pendamar area.
And I want to ask, Pelabuhan Klang wants to know whether the State Government will upgrade the water gates within the Pelabuhan Klang area, especially in the Pulau Indah area, and also at Sungai Tengkorak, Kampung Perajurit Telok Gong. Here there is a gate, a water gate of the Selangor State Drainage and Irrigation Department (JPS), and I have been informed that there will be upgrading works, but I do not see it in this Budget Book. Will it use State Government allocations or Federal Government allocations? Pelabuhan Klang requests that both water gates in the Pulau Indah area and also in the Kampung Telok Gong area be upgraded immediately using the pump system as at the Sungai Aur water gate, Pandamaran, Pelabuhan Klang.
And at the same time, Pelabuhan Klang would also like to request the State Government to review the embankments along the coastal area of Pelabuhan Klang: whether the existing embankments are adequate in height, or whether their height needs to be raised further. This is because, based on the climate change that exists now, even sea tides are now unpredictable, heavy rain is also unpredictable, and floods often occur, often causing existing embankments to burst. There may be a need for upgrading works on the embankments along the coastline of Pelabuhan Klang. The same goes for the Sungai Pendamar and Kampung Pendamar area, because recently the Kampung Pendamar area has been inundated with water several times due to flash floods. Water entered houses, and even during the election season, two weeks into the campaign, water entered residents' houses. Although the rain was brief and not long, it still flooded.
And I see that one of the causes is the drains belonging to the Selangor State Public Works Department (JKR). I think these should perhaps be maintained by the road care company, because road ST3218 is a federal road, but the water flow is blocked at the large drain belonging to the Federal Public Works Department. So Pelabuhan Klang requests
that the State Government take seriously the issue of flash floods in the Pelabuhan Klang area, and my office is always open to discussing with any department and government agency for the sake of safety and the sustainability of residents within the Pelabuhan Klang area, especially in the Telok Gong, Kampung Pendamar and Pulau Indah areas. So Pelabuhan Klang supports the 2023 Development Expenditure Estimates. Done, have I already expressed support? Just a little more. Do I still have to say more? Okay, next...
May I interject?
No, no, no. Okay, next. Pelabuhan Klang, while there is still a little time left, page 235, the development of drainage systems: building and upgrading drainage in Klang district. Pelabuhan Klang would also like to propose to the State Government that, for now, because of the unpredictable climate change that has struck our country, these existing drains should not be stingy. For example, if MPK builds an MPK drain, JPS builds a JPS drain, and JKR builds a JKR drain. There are also private drains that we need to help with. We need to help, we need to clean them and we need to maintain them.
So I propose to the Selangor State Government that it set up or establish an allocation so that we can maintain and clean private drains whose owners we do not know, and we can use this allocation, and perhaps we can give it to JPS or the Local Authority to manage these ownerless drains. This too must be done for the sake of safety and the sustainability of residents within Pelabuhan Klang. Okay, lastly, Pelabuhan Klang supports the 2023 Development Expenditure Estimates – the Selangor Budget. Thank you.
Thank you, the Honourable Member for Pelabuhan Klang. The time has reached 1 o'clock in the afternoon. I hereby adjourn the House until 2.30 in the afternoon. The House is adjourned.
(THE HOUSE ADJOURNED)
(THE HOUSE RESUMED)
(MR DEPUTY SPEAKER IN THE CHAIR)
Peace be upon you and God's blessings, and greetings of well-being. The House is resumed. I invite the Honourable Member for Sungai Ramal.
Assalamualaikum warahmatullahi wabarakatuh. Alhamdulillah, thank you, Deputy Speaker, for giving Sungai Ramal the opportunity to state some matters concerning the Development Expenditure for Year 2023. Allow me to begin with the first, which is by referring to Vot P01, page 197, under the heading Social, Code 04001, estimated expenditure of RM 64,628,000.00. Here I would like to touch on the funds allocated to the Honourable Members of the State Legislative Assembly, which generally are an average of around RM800,000.00, with slight differences between each State Legislative Assembly. We witness that, among the states in our country, the state that has received the most additional voters after undi 18 and the automatic registration exercise is Selangor, and my own area, Sungai Ramal, received new voter registrations of more than 50%, from 60,000 voters to nearly 100,000. We have seen recently that the State Government implemented a slight increase, not to each ADUN, but this increase is far less than the increase in the number of voters in each DUN itself.
So I would like to take this opportunity to propose to the State Government that it consider, for next year, increasing the funds allocated to each ADUN by approximately 25% on average over the total amount previously given. Actually, this allocation is very beneficial to us in helping the people in our area, because there are many needs of these people that are not covered, not included, or cannot be protected by the existing provisions of the Kebajikan Iltizam Selangor Penyayang. For example, in my own area there have been several incidents of flood disasters and also house fires, both of which involve large losses, and the assistance that must be given to the victims is quite large assistance that requires quite large expenditure too. Likewise with matters that are unforeseen, such as the transfer of patients who have to use an ambulance, which incurs expenses. So we have to use the allocation from the ADUN too. Also, my area happens to be, for example, close to Kajang Prison, and we have many families of inmates who live near my area in Kajang Utama and its surroundings. When the father becomes an inmate in prison, these are usually the sole breadwinners, so the wife and children left outside have no more source of income. They are usually cut off from the social network of the community, which causes the children to receive no attention and lack sufficiency; they begin to play truant from school, stop going to school, get caught up in unhealthy social activities, and in the end they too may even become inmates in the future. So all this requires more attention from representatives of the people like me, and I can only function better if I receive a larger allocation.
Second, I would also like to request that the government reconsider the categories of use of these allocated funds, because I feel that the categories of use are rather outdated relative to current developments. For example, in the guidelines or in the guideline document, an ADUN or Member of the Assembly may use this allocation, for instance, to build a titi (footbridge), but until today I have no need to build a titi in my area. The greatest demand in my area, for example, is for the services of air-conditioning units. In my area there are approximately 123 surau, but under the allocation, air-conditioning units are not permitted to be used under this allocation for Small Projects. We also have, for example, electrical wiring, because we have many, for example the Headquarters, the RELA Operations Centre, Rukun Tetangga offices that use cabins and so on, which require electrical wiring services, and now all matters related to this renovation have risen greatly in price. They need this assistance but cannot be channelled because electrical wiring, for example, is outside the conditions of use and the ADUN allocation for Small Projects. So please, the government should review this. Second, I turn to matters concerning the library on page 199, Library Code 14001. This is connected with the District Library in my area in Hulu Langat, located at Tasik Cempaka, Bandar Baru Bangi. My district library area was the last one, which I understand received an allocation for improvement and upgrading of the library, and it should have been completed and ready for use again by November 2021. Now more than a year has passed, and there is still no sign at all that this library can be used again, even though it is a large, magnificent building standing apart at the edge of the lake. It is unfortunate that it still cannot be used by the residents of Bandar Baru Bangi, who are well known as Bangi Bandar Ilmu. I hope to receive an answer as to what the problem is, and that this library can be used as quickly as possible by the residents in the Bandar Baru Bangi area.
Then, moving on to the third, the Selangor Water Supply Project Development. Referring to page 200, under PK 16, Selangor Water Supply Project Development. In my area there is an area called Kampung Bangi. This is one of the villages developed early in the Sungai Ramal area. This village is at least 150 years old, and at the early stage, this village (being among the earliest) was supplied with water, but through pipes of small diameter, which resulted in low pressure. It was sufficient at that time, but now, more than 20 years after the original water connection, the number of houses has increased so much, yet the pipes remain the same, causing water pressure to be very low, and many residents there have complained that they do not get sufficient water supply to enjoy clean water facilities there. So what is considered unfortunate and more heart-rending for the residents there is that their area is also...
[the speech continues]
Too much water, that is, they are often burdened with flood problems in the village, but at the same time the water taps have too little water. So we hope we can give some comfort to the residents of this village who have long complained about this matter. I request that Air Selangor look into this matter. Fourth, I also wish to place on record a speech, which is more a speech of congratulations and my appreciation to the JKR Hulu Langat (Public Works Department, Hulu Langat), because upon the request I put forward, they gave attention and took action, where they have installed street lights on Jalan Bangi heading towards Banting under Vot P12 Code 01501, page 219, Installation of Lights. This is an area that is truly surrounded by forest on both sides, dark. At night it is the most frightening and terrifying area in the Sungai Ramal DUN area. There are many stories of encountering all kinds of creatures there, and this time, finally, after so long, the street light has been installed. So, Alhamdulillah, so far I have not heard any more strange stories occurring in that area.
Then I refer to the matter of Flood Mitigation. I cannot let this opportunity pass; I mention Flood Mitigation under Vot P13, Subject Code 01502, on page 232. Here it is stated concerning the Flood Mitigation Project at Sungai Lemas in Kampung Sungai Ramal Dalam. This is an area that frequently experiences rising water when heavy rain occurs, and recently, about 4 or 5 days ago, it happened again, where a car was trapped and then taken away, swept away by the current in that area, and before this there was also an incident of a car being trapped by the current. And there, when the water rises, it can rise suddenly and the current is strong. If those who do not understand that area very well try to wade through it, by taking the risk, the car can easily be pulled by the current from the floating road straight into the river, and it can endanger safety and risk lives. So, I see that there is already an allocation provided there, only that this area may still, until today, not have been acted upon, because it involves a little problem concerning a land dispute between an individual and the government. But because of this very serious problem, I hope the government will take firm and decisive action this time to resolve the flood problem in that area by carrying out this flood mitigation project without further delay. And one more is at Kampung Bangi. I must also mention that because the Bangi area is an area sandwiched between two rivers, namely the Sungai Bangi and the Sungai Semenyih, this village receives two (2) threats at once. Sometimes the Sungai Bangi overflows, sometimes the Sungai Semenyih overflows, and sometimes when both rivers overflow, the fate of that village is so heart-rending, and there were also those who were injured in incidents that occurred before. Floods usually occur before dawn, and when the water rises, it causes a power trip, so all the lights do not come on.
The villagers have to walk out in the dark to save themselves. So, there are some who, when the water has risen, cannot even find their slippers. They walk just like that, stepping on glass and so on, receive treatment and so on. So far, Alhamdulillah, no lives have yet been involved, but we hope it does not reach that level, because when the river water rises and overflows into the village area with a strong current, it truly does not recognise which is the road, which is the drain, and which is the river. If anyone is caught and taken straight into the river, they will face a truly terrifying fate. So we hope, I really hope, that this time, I have been informed that the allocation has already been released, approximately RM7 million (Alhamdulillah), only it has not yet been implemented, translated into the actual execution of flood mitigation work in that area, and I hope that this time it can truly be implemented so that the fate of the residents there can be properly protected. So that is all from me. I hereby support the motion for the Development Expenditure Budget for Year 2023. Thank you, Deputy Speaker.
I invite Kota Damansara.
Thank you, Deputy Speaker, for giving Kota Damansara the space to take part in the debate on the Development Expenditure 2023. I draw attention to page 198, PK 606002 Social Welfare. I would like to read this together with PK 808003 Non-Governmental Organisation Assistance and PK 808004 Worker Protection. Deputy Speaker, in the earlier debate there was mention regarding legal aid. Legal aid for the working class was also mentioned, that the assistance would be used for cases involving civil matters, and also, to put it simply, civil and also workers. However, I would like to draw attention to the allocation of RM1 million given, and I request that the Selangor Worker Protection Unit broaden that allocation so that it is used for worker issues that largely involve Section 20, dismissal of workers, or Section 18, which involves industrial disputes, and also Section 4 of the Industrial Relations Act, which involves the oppression of workers. I hope the allocation of that unit, PK 6006002 – Social Welfare, or that Legal Aid, can be broadened to cover cases involving Section 20, Section 18, Section 4 of the Industrial Relations Act. Also under Non-Governmental Organisation Assistance PK 808003. I very much hope, and I have already informed the Y.A.B. Menteri Besar, regarding the MTUC itself. We understand that the MTUC, or the Malaysian Trade Union Congress, represents 16 million workers in Malaysia, and this body is recognised by the ILO (International Labour Organization, United Nations), and even the Federal Government has given a form of grant or allocation of RM4 million. However, Kota Damansara hopes also that the Selangor State Government will give a special grant or allocation to the MTUC, so as to show that we too stand together with the working class. If we look back at history before 2008, how the labour force helped to win the Pakatan Rakyat Government at that time. I hope the Selangor Government can provide an allocation of perhaps RM500,000.00 as a grant in the form of a grant to the MTUC. Also on the same page 198, PK 9 Treasury, 09, PK 909003 relating to transport, Transport Treasury, I have also raised several issues concerning the alternative road of Desa Subang Permai. I cannot see anywhere in this development expenditure any development of an alternative road connecting Jalan Kampung Subang, Pekan Subang with Jalan Subang Permai, which has also been debated in several previous sittings. I hope this allocation of approximately RM25 million can be channelled for the construction of the alternative road of Desa Subang Permai. On page 200, PK 15, 15003 – Skim Ceria, approximately RM7 million. In Kota Damansara there are several apartment blocks that are rather old and need repainting and so on. I would like to raise that there are several apartment blocks which, I hope, the Selangor State Government can allocate for painting under Skim Ceria, namely Gugusan 3K (Kantan, Kekwa, Kemboja), Section 7, Kota Damansara, and also Gugusan Seroja, Section 6, Kota Damansara.
On page 218, I would like to ask under code PK 101005, namely Gazettement of State Roads Throughout the State of Selangor, amounting to RM1.5 million. I request an explanation of RM1.15 million, what is the scope covered by what is called Gazettement of State Roads Throughout Selangor? Perhaps we need it, because some of these roads, if they are not gazetted, then we cannot obtain MARRIS allocations and so on. Kota Damansara would like to request an explanation regarding the scope of that gazettement. On page 222, code PK 303102 – Construction and Upgrading of Jalan Gajah 6 to Persiaran Atmosfera, approximately RM500,000.00. Persiaran Atmosfera is still full of potholes, still damaged. It has been repaired several times. Does this cover the road that needs repair? I remember that a lot of money was spent before. I hope that with this allocation, Persiaran Atmosfera can be fixed once and for all. Likewise on page 223, PK 404102 – Upgrading of Jalan B49 – RM500,000.00. Does this cover Persiaran Mahagony in Kota Damansara? Because it is not very clear there. I request an explanation. Next, page 248, PK 3 – Mosque 03104 – Masjid Subang Bestari. Allocation of RM7.5 million. Kota Damansara would like to express thanks for the allocation for the construction of Masjid Subang Bestari, as we can see the land has already had work done on it. However, the other mosque, which is 03107 – Masjid Kota Damansara 2, Section 9, in this allocation is RM10.00. I do not know why this mosque has no allocation, because I understand these two mosques have also been approved, but this allocation does not mention it. I hope Masjid Kota Damansara 2 can be included in the allocation for next year. That is all. Kota Damansara supports the bill. Thank you.
I invite Kota Anggerik.
Thank you, Honourable Mr Speaker, for giving me the opportunity to take part in the motion on the 2023 development allocation budget. Briefly. I have only two matters I wish to raise.
Referring to page 219. Project code PK101001, namely Rehabilitation of Slopes throughout Selangor. I would like to ask for the views or explanation of the State Government, because in my constituency there are many slopes, especially those involving condominium housing, apartments and so on. In the case of slopes with problems in condominiums or apartments, can the slope rehabilitation allocation be used or applied for such cases? Because following the floods that occurred at the end of last year, many areas in Kota Anggerik, especially in Shah Alam, have had their slopes affected, with collapses and erosion, and there has been no action until today. As an example, at Seri Alam Kondominium at the Sultan Salahuddin Abdul Aziz Shah Golf Club in Seksyen 13, there is a very dangerous slope problem, and on the hill above it there is a tank belonging to Air Selangor. So when we raise it with the Local Authority (PBT), they will say this falls under the supervision of Air Selangor, but at the same time it will become a pin point. So we do not know who will take responsibility, but at the level of the Joint Management Body (JMB), they have stated in terms of cost, because slope rehabilitation work is not an easy task and incurs high costs. So I ask for an explanation from the State Government on whether the allocation stated in this budget book can be applied to those cases. That is the first.
The second, page 222, PK303101, namely the details of Building a New Road from Setia Alam, Bukit Bandar Raya, Bukit Jelutong. First, I thank the State Government through the Public Works Department (JKR) for the initiative of this project, which I feel is very good as it can improve accessibility in the Shah Alam area. However, I would like to ask the State Government for an explanation of the government's assurance regarding this project. Will there be a new forest area that will, as people say, be cut or felled, and is there a plan that may be used to save it or, at the least, as people say, minimise the clearing or felling of the forest? Because I have been informed that the Setia Alam, Bukit Bandar Raya, Bukit Jelutong area will indeed involve a small part or portion of the Bukit Cerakah forest, Taman Botani, which is near the Botanical Garden. So, can the State Government provide some assurance or explanation of how we will implement this road construction development project while at the same time guaranteeing the sustainability of the environment, especially the forest, in the Shah Alam area. Thank you.
I call upon Kuala Kubu Baharu.
Thank you to the Deputy Speaker for the opportunity given to take part in this motion. I refer to page 200. Object code 14012. No, sorry. Wrong object code. 14013 – Upgrading of Village Libraries, for which the allocation for next year is RM1.2 million. I see that RM1.2 million is quite a lot. So, I want to know
from the State Government, how many village libraries will be upgraded? And I want to raise that in my State Constituency (DUN), there is indeed one village library for which I have asked the State Government to upgrade the library since 2016. But until today there is still no good news. I have been informed that this library indeed has an unresolved land issue, and I have also tried to resolve that land issue. I hope that with the Unity Government, of which Pakatan Harapan is one of the members, the land issue can be resolved, and after the land issue is resolved, the library can be upgraded, because at the moment, if the staff want to go to the toilet, they have to go home. The toilet cannot even be used. So, it has reached such a severe state that the upgrading work needs to be expedited.
Mr Deputy Speaker, I refer to my second point, which is also on page 200, object code 15004 – Abandoned Projects Rehabilitation Fund. I see that we have not made any allocation since 2021, but in the budget speech for next year delivered by the Y.A.B. Menteri Besar, it was stated that this fund still has a balance of RM6.98 million, and that the balance will be used for several abandoned projects. I feel that this specific fund, that is, this specific fund, is important for completing abandoned projects, especially kampung expansion projects approved before 2008. I would like to give some information to this honourable House that in the Batang Kali State Constituency, next to me, there is a kampung expansion project, namely Kampung Melayu Rasa, which has been abandoned. It was approved by the State Government in 1999, and its land covers 32.391 acres. The proposed project comprised 161 house lots and 7 shop lots. Unfortunately, the project was abandoned in 2002. I pity the house buyers, because some of them have passed away, and some heirs have not come to seek the State Government to find out what rehabilitation can be done by the State Government for the abandoned project. In 2017, I brought them to meet PKNS. PKNS initially intended to rehabilitate the project, but after conducting a study, they informed the buyers that the project was not viable. After that, the State Government also tried to rehabilitate the abandoned project, and I have been informed that they want to use the funds for that site to rehabilitate the infrastructure in the area. I often pass along that road, from Jalan Ampang Pecah to Rasah. The project is only on one side of the road, and many house buyers have already built their own houses, without any proper road. The road is an earth road and there is no drain along the side of the road. I feel we need to help them. Surely they cannot be expected to pass along a red-earth road every day. The State Government may be able to use the remaining RM6.98 million to help the infrastructure there. Perhaps not all of it for that project, but whatever is needed in terms of infrastructure. I hope the State Government can help.
After that, I want to refer to the point
KPS, page 234. I see that PK1 and PK2, I have checked, there are not many projects in Hulu Selangor, only one, namely RM1 million for a flood mitigation project in Batang Kali. I would like to request an explanation of what work is to be carried out for this flood mitigation, because that is indeed a flood-prone area, and during election season I also faced flash flood problems there, and candidates had to visit flood sites. I feel the shortage of allocation for the Hulu Selangor district is because we do not have an officer leading the Hulu Selangor Department of Irrigation and Drainage (JPS). Its head retired in October previously, and until now I have not seen a new head come into the office. So I want to ask when JPS will appoint a district officer for the Hulu Selangor JPS. That is all, Mr Deputy Speaker. I support this motion.
I call upon Sentosa.
Thank you, Honourable Mr Deputy Speaker. I would like to draw the attention of Honourable Mr Deputy Speaker and all members of the Sitting to page 238, Vote Project P13, Project Code 05103, Upgrading of the flood retention pond at Sungai Aur. Regarding Sungai Aur, there is a lot I want to state, because the whole of Bandar Puteri, Taman Sentosa, Bandar Botanik and Bukit Tinggi all use the Sungai Aur drainage. This Sungai Aur, the work that has been reported is the budget request to upgrade the flood retention pond at Sungai Aur. But Sentosa wishes to bring some attention to the Honourable EXCO member. Last week he informed us that Sungai Aur needs to be widened and upgraded, and also that the flood retention pond in Bandar Puteri, which was built by the developer, is not effective at all, because Bandar Puteri floods. The Honourable EXCO member and State Assemblyman for Sungai Kandis also agreed that we have a problem in Bandar Puteri, where the Honourable EXCO member informed us that the improvement works by Gamuda or the developer must be enforced or carried out urgently, which is a request from Sentosa together with Sungai Kandis. Because three floods in one month is intolerable. And indeed, the water flowing from Taman Sentosa, the drains are zigzag. I also do not know how. This is what we call pocket development: every developer submits a plan, and whatever approval is given is the result of their work. Now the water cannot flow smoothly to the nearby river, namely Sungai Aur, and along Sungai Aur last week we asked at the MPK, and only government agencies will go together along the drains to the river. There are many obstacles. Under every bridge there are obstacles, such as utility cables, water pipes and all sorts, some that make it difficult or hard, obstacles that prevent the water from flowing out. Therefore Sentosa requests that a task force be set up to resolve this matter quickly. We cannot bear it anymore. Every time it rains for 30 minutes or 1 hour, there is flooding. And how many times must we pay compensation to the residents of Taman Sentosa? Therefore, Sungai Aur must be widened along its length.
Second, the monsoon drains along Jalan Sungai Jati and Taman Sentosa that flow into Sungai Aur also need to be widened. I hope the Honourable EXCO member can help by giving instructions. Can, Honourable EXCO member? Can. Thank you. That is a request from Sentosa. I have asked Taman Sentosa to be given city status. Please help Sentosa, because Sentosa is a residential area that is very crowded, with more than twenty housing estates within one estate. That is the situation there. The second is the estate within an estate. Page 201, Menteri Besar's Office, PK19, 19001, from various amounts budgeted, RM68 million. Sentosa wishes to ask about the construction of a crematorium: who is responsible for building the crematorium, the District Council or the Municipal Council? Can the State Government help build this facility? I have just come from a funeral in Simpang Lima. There are only two burners. People have to wait for their turn. This is also during normal times, not during COVID. During COVID, people had to wait for days, for weeks. But we cannot wait for emergency situations to build a crematorium. This is the time I ask the District Council or the Municipal Council to complete the budget work for next year or two years from now, or ask the government to help build a crematorium in the DUN area, especially the Kuala Selangor area. The Kuala Selangor area has no crematorium. There is only open cremation. This is not only for the Indian community. This is for other communities that use crematorium services.
Mr Deputy Speaker, the third point I want to bring up is page 197, Vote Project P01, Menteri Besar's Office, PK3, Entrepreneurs, amounting to RM6,080,000.00. I want to ask whether the i-SEED and SITHAM programmes will continue in 2023? As we know, in 2019 we had an allocation of RM3 million. Later it was reduced to RM2 million. This was specifically for entrepreneurship programmes for the Indian community. Then it was divided into 2 programmes, i-SEED and SITHAM. Will these programmes continue in 2023?
Finally, Mr Deputy Speaker, Public Works Department (JKR), Project Code 04300, this is from the JJ Roundabout towards the KESAS Highway. Since I became the State Assemblyman for Sentosa, we have always been told that the project from KESAS to Kampung Jawa will be widened, the road and the drain. Until today there has been no plan and no budget, but we are always told by the JKR Director that it is already in the budget, yet there is no work or planning. Therefore, I ask the Government to help find a solution for the works from Jalan Kebun to Kampung Jawa, namely the famous JJ Roundabout. People always say "JJ Roundabout", everyone knows it. Traffic jams until you cannot get out. Traffic jams for hours. Therefore, Mr Deputy Speaker, thank you. I thank Mr Deputy Speaker for giving Sentosa the opportunity to debate the development expenditure. Sentosa supports. Thank you.
I call upon Meru.
Thank you to the Honourable Deputy Speaker. Thank you for giving me the opportunity to debate. I will go straight to page 198, Vote P01 Office of the Menteri Besar and State Secretary, PK9 Treasury, codes 09001 to 09005. Here I want to raise issues relating to the Treasury, local authority (PBT) basic facilities, public amenities, transport, and solid waste management, which in Meru is a major issue relating to rubbish, as I mentioned in the previous debate. After the major flood that struck last year, solid waste management is very weak, and we can see how enforcement is also rather lacking. What I need, in my view, is an increase in the number of rubbish collections, which must be implemented immediately because of population growth. At the same time, traders in Meru have also increased, especially unregistered traders, which causes the rubbish heaps to grow higher. The Meru area is also a village area, where villagers also dump rubbish in residential areas, which further worsens the rubbish situation there. The second issue concerns foreign traders who use the premises provided. The rented shops, most of which they, in Ali Baba arrangements, use the names of local residents to run businesses, especially in Taman Dato Bandar. If you go there, all Honourable Members, you will feel you are not in Malaysia. Even the signboards put up there use Nepali and Bangladeshi language. Actually, if you follow what happens there, I have lodged many complaints, but it is very unfortunate that the enforcement there is not very strong, not very aggressive. We have also received reports from the residents there that the upper floors are being used as mini discos, that there are gambling places, and that there is reportedly some prostitution there too. So this matter is serious for me because it is a Malay area. In Taman Dato' Bandar, and we received this report, my report cannot include evidence here, there are people who guard that area. So we hope the enforcement authorities can be more aggressive, to, as people say, take action. I say syabas, I will speak frankly, I say syabas and congratulations to Encik Sharul, although he is now in this hospital. I have just visited him, but he is still taking action against these foreign traders. Also, in the previous session I hoped that the illegal structures in Meru being used as business premises for these foreign workers could be demolished, as many of these illegal premises have been built near the Top Glove factory there. We once demolished them at Jalan Teratai, but they were rebuilt. They were rebuilt. I hope there will be firmer action from the enforcement authorities, especially the District Office, to ensure that the houses or structures can be demolished. I have also made a suggestion before that premises rented to foreigners be confiscated. I think this matter is under our jurisdiction, the jurisdiction of the PBT. We have the power to confiscate premises used by foreigners, as long as we do not act firmly, merely compounding them or merely confiscating their goods. For information, usually the goods are confiscated in the morning, from 2.00 to 3.00 in the afternoon, and two (2) to three (3) hours after that, they have started their business operations again.
Next, I would like to refer to Vote P12, page 219, Public Works Department (JKR), PK101003 on road repairs. Yes, I hope Meru can be given some attention, because Meru is indeed a flood-prone area, as everyone knows. That is among Meru's identities from the past until now, which still has not been resolved. Usually, roads in flooded areas will be damaged. The roads will be damaged, so focus must certainly be placed more on these flood-prone areas. I also hope the JKR can give attention to the road at Batu 8 pasar malam Meru, the Jalan Batu 8 pasar malam. As far as I remember, I went to that area with JKR officers before the PKP, and that road was badly damaged but has not been repaired until now. Moreover, before that, the JKR was informed but did not even notice that it was their road. Perhaps this is because the area is rather remote and at the same time seldom travelled by officers, apart from residents in that area. So I feel this matter must be given attention, because that road has become a main road. The road was damaged because of a quarry there, which I understand was previously operating illegally. I am not sure of its status now, because I understand the Klang District Office previously tried to whitewash it to help the quarry comply with regulations and so on. But I do not know what its status is in the current situation. Next, I would like to refer to B20, page 142, sorry, go back: Klang District Office, Kepala 5005000, Overtime Allowance. This relates to the issue I raised earlier at Jalan Batu 8 pasar malam too. There is an issue there relating to illegal rubbish dumping, which I consider very serious. It is dumped right at the roadside, and at night..
Mr Deputy Speaker. I would like to refer to the Standing Orders.
Silakan.
36 (1) Debating the Development Motion. So, there should not be a Municipal Council meeting handling complaints, in order to save our time. We only have one day, one day.
Baik.
Alright, let me interject, because in this matter, I refer to the Honourable EXCO here. And this is the opportunity I have to convey what I want to say.
That is not a development issue. That is a management issue. If there is such a serious matter that has to be brought here, it should be debated when we debate the Bill..
Because this is development relating to roads and repairs there.
That is not development.
We discuss development. I think development is important. Earlier, it has already been quite long, long and wide, but
About the foreign traders earlier, okay?
Ya?
The foreign traders earlier.
Itu pembangunan.
Okay lah, okay.
Ya.
Okay lah, never mind. I accept advice and admonition from Bandar Baru Klang as an old hand. Okay, and finally, in that case I would like to return to the JKR matter from earlier. I also hope the JKR, under item PK1 01003, can focus, since we are now the Government, we are now together with the Federal Government, on Federal roads, which so far we have overlooked a great deal. I also hope we can carry out immediate repairs so that the comfort of the people, especially in Meru, can be expedited. And I hope that what I have raised here will also receive attention from the relevant departments. Okay, I thank you, and I support the Development Expenditure that was tabled by the Honourable Menteri Besar.
I invite Seri Setia.
Thank you, Mr Deputy Speaker. I would like to begin on page 93 under Item Code 514000, involving Construction and Maintenance. Among them is the request regarding the Selangor State Public Works Department (JKR) that I would like to ask, if possible, to upgrade Jalan Klang Lama. Jalan Klang Lama starts from Kontena Nasional
until Heineken, the Heineken factory. If we look at the area or the road, it is still at the old standard. I do not deny there have been repairs, repairs to lights, repairs to potholes, there have been repairs. But I request that it be upgraded. Among the reasons I request this is because accidents have happened there. There is a traffic light nearby, but there is no road divider, meaning it is just a big road with only lines. Sometimes the lines even disappear, that is what causes the problem. And on its side, facing the Petronas Desa Mentari, it is still Jalan Klang Lama, still the JKR road, and at that Kontena, it has been used as a parking place for heavy vehicles. Trailer lorries park there. There is no road divider there, there is nothing in a way that makes it more difficult for lorries to park their vehicles there. And accidents have happened there and caused deaths. For this one, I ask that the JKR upgrade that road.
Next, on page 196 under PK14, Vote P01, Library. I hope that, with what now exists in Lembah Subang, a library can be built there. A community library for the residents of the Lembah Subang area. We know what the situation in Lembah Subang is like. There are ways we can discuss this. I keep returning to the story of the abandoned land, which is Government land. This one we can discuss so that together we can build a library. Previously we had discussed setting up a Community Library in the Lembah Subang area, but it was stalled because of 22 months. This time I really hope the Honourable EXCO, we can discuss setting up a Community Library in that area. Then, page 198 under PK 7 Youth and Sports, this one, 07002, this one too, because I already raised it in the debate the other day, this one is also the same, which involves sports courts for young people. I need assistance from the State Government so that we can build, for the young people in that area. Then, page
Honourable Seri Setia, could you elaborate a bit on that, because it is too general.
Alright, this one, what I hope is that a sports field can be built, or I should not say Sports Complex, as it may sound.. a sports field that can be used, multi-purpose, in the area I mentioned in Lembah Subang. This is the issue: in Lembah Subang there is a lot of land. I already said last time, the Fire Station (Balai Bomba), the Bomba land, they wanted to build but it did not happen. A school wanted to build but it did not happen. What else? Many things that should have been built were not, and if they want to build, I am not confident that it will be done within 10 years. Perhaps the State Government can discuss arranging a lease or something like that, this one I hope for in that area. If it is other areas of Seri Setia, perhaps they are rather crowded; only that place has empty land. Next, under Project Code PK17, sorry, excuse me, PK19003, page 201, Land Reacquisition. Seri Setia also has a problem where the lands, which formerly were lands we are not sure whose they are, were built into a hall or built into a Balai Raya, but eventually the Balai Raya is no longer used now, the hall is no longer used. We want to make it more orderly, more properly arranged, but we cannot, because there is overlapping information, overlapping of land records. So I hope that with the help of the State Government we can identify whose land it is. For example, in the area of PJS 6 Kampung Lindungan, PJS 63 Kampung Lindungan, this one is also the same, PJS 8 is also the same. The land is vacant, but this land was previously developed without permission. Now it is no longer possible, it is already empty, no one maintains it, but when we want to redo it, we cannot. The regulation is that the status of this land is still incomplete. So if we could get the status complete, we could build a hall. Alright, that is all, MR DEPUTY SPEAKER, thank you. Seri Setia supports the Bill (Members laugh). Motion! The Motion.
Alright, now I invite the Government side, if there are any explanations to give. Pandan Indah?
So much to answer here. I do not know which one (laughter). I accept the general questions as suggestions, especially those relating to the same question asked many times by Honourable Members of the House, regarding the allocation for street lights and traffic lights. For the information of all Honourable Members, street lights and traffic lights are done together with projects. So they are not done separately. So, the bulk of the allocation for street lights and traffic lights lies in the relevant projects. That is how it is. What we give here, these districts only have a small allocation for lights, where they ask for one (1) light, two (2) lights and so on. We placed that at the early stage of this budget, we placed the same amount for all districts. But as time goes on, when we see that some districts need more, we will transfer that Vote. This has already become policy and we implement it every year like that. We start with the same amount, then we see later when there is a need. And this is only ad hoc, yes, the additional allocation to the piecemeal, as people call it, one by one like that, not a large allocation. That is why for solar lights too, we make them separately, we make an additional RM2 million, and Phase 2 will follow later, which was answered by the Honourable EXCO for Religious Affairs this morning (laughter). For, I will give a slightly more detailed answer to the questions that arose earlier. For Dusun Tua, yes, Dusun Tua. Dusun Tua asked about the Langat River Basin in relation to Code 0150, which in general. If it is in the allocation or budget, the estimates prepared, when under the allocation for this year, it has a ceiling, a project cost ceiling, so if RM10.00 is placed, that shows the project already exists but is still not a priority. We already have the project, but it is not yet a priority and not yet time, and that year there is no more expenditure, so it means perhaps it is still at the very early stage. That is why it is RM10.00, it does not mean we want to carry out a RM10.00 project, no. That is the understanding, generally, yes. Then
when it says RM100,000.00 or RM200,000.00, usually that is the initial cost of appointing a consultant. The consultants we appoint, the cost is indeed not that high, 100,000 or so, or the early works, which are largely under Hulu Langat, much of the work is still at the consultant stage, so we have only just appointed them, and that is why we budget only a little, 100,000 or 200,000 or so. That is what it means.
I interject, Honourable EXCO. I understand that the allocation is the initial allocation for consultants and so on. But in this session, the Second Budget Session, I still hear that it is still within the period to find consultants and so on. That is why I want to know the update for this project.
That is what I said about the general procedure for implementing flood-retention and road projects. It is not a process that can be done like instant noodles, ready in five minutes. It is not an easy process. The process involves measurement, land issues, sometimes partial matters involving land acquisition, work issues, and procurement issues. It takes time. That is why we can only do it that way, except for emergency projects such as burst embankments, which we can fast-track. Even then, if the project is very large, as in Tanjong Karang, it requires a study, because if we do it hastily, it will collapse the next day. Technical studies must be done carefully to ensure the implementation runs smoothly. This is what is happening. So at the Hulu Langat level, most of it is still at the consultant stage for the final design before we call the tender.
What we were informed of, the biggest project under the Federal Government, is the one involving RTB, the Sungai Langat Phase 2 project worth 2billion. It is understood that the appointment was to be made in January, but with the new state government we do not know, because the project is by direct negotiation. So we wait. I have stated in the House last week that I would meet, and I have indeed met our Minister of Water, the Honourable Nik Nazmi, to discuss how we need to expedite the serious flood-retention projects in the State of Selangor. As for the Honourable Member's proposal on river cleaning, we need to consider it. However, on the issue of sand extraction here, which falls under Kumpulan Semesta, our concern is firstly that the sand extractor takes sand and does not follow the SOP for implementation to maintain the river's contour, which is often a problem. It digs wherever it wants sand and leaves that place, and that place often becomes a problem. If we look at and examine it further, another point is that when we dredge a river, if the banks are not strengthened, they will collapse. This is another major problem we need to examine. We have begun receiving existing proposals to be pursued so that our rivers can be properly developed and properly managed. For Banting, I have already answered on street lights and traffic lights earlier.
Not yet, actually. I am asking for clarification.
Let me answer first. For Labohan Dagang, which the Honourable Member mentioned under Code 16001, Labohan Dagang, as the Honourable Member is also aware, is already completed. In fact, this year's work was distribution works, namely the piping system, and part of the piping cost has not yet been fully paid, so it carries over to next year. For the final works, the payment is not for any new project. These are payments that must be made in the coming year, 4 million. That is what shows Labohan Dagang. As for 04401 concerning those roads,
Terima kasih
Let me finish first, Honourable Member.
Actually, I wanted to ask about the street lights and traffic lights.
I have already answered that earlier.
Not yet, actually.
I have already answered; that is all I can say.
Bagi sebab
There are applications for street lights and traffic lights. That is what we will allocate first. When there are applications, we will look at the first three months. If more is needed, we will distribute it to the places that...
Honourable Member, when I took part in the debate last Friday, I asked specifically about traffic lights, namely the traffic lights that already exist, but the problem that happens, whether there is a shortage of spare parts or replacement parts needed to maintain them, and all the traffic lights in the Kuala Langat area are not under the Kuala Langat Municipal Council; all of them are under JKR. So what happens, has happened, and often happens, is that when one traffic light breaks down, one has to wait for days to find a replacement part. That is the problem. That is why I strongly request that the building allocation under the head be used as best as possible to build a stock of replacement parts needed specifically for traffic lights.
I think the Honourable Member is actually confused. That maintenance is not under development; development refers to new projects. Maintenance under MARRIS, Honourable Member, the allocation for roads and electrical works is also under MARRIS, and this is a separate budget from what I mentioned.
Actually, the Honourable Member for Pelabuhan Kelang also responded to my debate on that day, asking whether it is possible for the existing traffic lights used by JKR to be upgraded, because one of the reasons they often break down is that the system is outdated. When something is outdated, we know that spare parts for a car, if it often breaks down, are difficult to find. We have upgrades to new ones. If it often breaks down and there are no spare parts,
That's fine, Honourable Member. I understand what is meant here. There are two aspects: one is a new project, and the other is an upgrade. The other is maintenance. Maintenance is all under MARRIS. As the Honourable Member for Pelabuhan Kelang asked, where the maintenance allocation is under MARRIS, we spend nearly 500 million a year involving JKR roads, local authorities (PBT), and also District Offices, under the MARRIS allocation for managing the maintenance of roads, drains, and longkang. That is one matter. But this upgrade, I admit, is indeed true. It is not only upgrading the type of light or the type of traffic light, but the system must be upgraded from a timer-based system to a sensor system. We can still rely on the timer system, but the timer sometimes makes us wait until midnight for two minutes and it still isn't green. It is a timer, so when the sensor is upgraded, it costs quite a high amount, and the upgrade is carried out in stages. If there are delays, as a result we can lodge complaints immediately to ensure that delays here and there are dealt with, which is what we need to manage. For the same matter, also related to the bridge that was raised, the same applies to the 10 ringgit. This means that at the early stage, nothing has been done yet. I understand that everyone says this project is urgent and so on, and we are constantly monitoring at the JKR level to ensure which is the priority, and we will prioritise what is needed. I will give an example, like Jalan Mokhtar Dahari. We found that there is indeed damage, so we had to bring it forward. This project is for solving problems. We will examine it. It is not necessarily specific as just now, which the Honourable Member for Kota Anggerik mentioned about Bukit Jelutong. In fact, when we re-examine that road, there is no justification for prioritising it. We may cancel it and conduct a fresh study from Bukit Jelutong to Shah Alam and Seri Setia, perhaps what is it called, Seri Setia, Setia Alam. We may cancel those studies that were prepared to look at it. It is Setia Alam, not Seri Setia.
On the issue of pig farming, I understand the complaint that the Honourable Member has lodged with the Department of Veterinary Services, and we take this issue seriously, and I want to tell a long story. These areas, and we have had a project since 2000, Dato' Teng knows this story, Honourable Member. Bandar Baru Kelang is very familiar with this project since 2007, the story of how we manage sustainable pig farming there, and the project should have gone ahead, but because it was nearly underway, the pandemic came, causing the expertise and investors from Taiwan to have to cancel. So we want to start again to find a comprehensive long-term solution. For enforcement under the Veterinary Services, it proceeds to the places that have been reported, and they will take action according to the existing provisions to resolve and correct the situation to prevent pollution, smell, and so on. But this project is a long-term one that must be implemented, and we need a high cost from investors to carry it out. We have already given approval for this implementation, but there are no investors yet who have succeeded in proving their capability to manage a project that may reach more than 1billion. This is the major issue that we will also manage. Since the post-pandemic period, we have also received offers or proposals for its implementation, and we will examine them and try to implement them as quickly as possible.
As for Subang Jaya earlier, the Honourable Member for Subang Jaya raised an issue. In fact, Honourable Member, there is an allocation under PK03106 concerning the project. It is placed under bank stabilisation and bank strengthening for a project for the Sungai Penaga tributary located at One Avenue, 180m, which will be installed there to prevent flooding in that area, at a cost of 2.331 million, and will commence in the first quarter of this year, 2023. It is now at the final stage of implementation. For this industrial road, a decision was made at the meeting in March 2022 for a 1.5 kilometre bank, which JPS will implement, and it is currently 20 per cent implemented. The on-site detention or retention pond will be built by MBSJ, Subang Jaya City Council.
Honourable EXCO, I beg to interject to request clarification on this matter, because earlier I heard the answer that MBSJ will build the OSD. However, when we held a consultation session between JPS and MBSJ, there was still no agreement on who would manage it, but MBSJ asked LMS to build the OSD. So I see that this matter is not yet resolved, although the proposal report has been issued by JPS, and they are only waiting for an allocation of 400,000 from the State Government. So I humbly request the assistance of YB EXCO on this matter.
I do not have that information, but according to the meeting, MBSJ is indeed working to resolve this OSD. At the JPS level, they are only preparing the bank. However, we will see later. So far, that is the decision of the meeting for the implementation for the industrial road, because it is an area under the local authority and enters the local authority area. Regarding Sijangkang, the Honourable Member for Sijangkang asked about the flood-retention issue for the Sungai Sijangkang. This is in fact a project already in the budget for us to upgrade in the area related to it, near Jalan Masjid and Jalan Sukepi, namely an area to be developed involving the channel, the upgrading of the channel, and also for the retaining of the track, this politician track included, valued at 2 million, which will be developed there and will begin in the first quarter of next year. It is ready to be implemented. As for the prawn ponds raised, we at the State Government level have always encouraged them, but we have stipulated the development of the many prawn ponds along the coast of Selangor from Sabak Bernam to Kuala Langat, which is that they must be ... apart from that, the land is resolved, whether by JPS and so on, but the farming must be environmentally friendly. It must be organic, because the sewage water is one of the causes that necessitates disposal, which destroys our natural mangroves and environment. That is why we have stipulated in everything we have approved recently, every few months, that they must change from conventional methods to organic methods, and their prawn feed is also much tastier and more expensive if sold on the basis of organic or environmentally friendly production.
I think the issue with the prawn ponds is mainly related to land, where they have been operating for more than 30 years, like that. The problem is that when they do not get the land status, whether LMS or otherwise, they worry that at any time the State Government may make a policy or stop their operations. If possible, perhaps from the perspective of LMS, among other things, the development of these ponds could be permitted, something the government could consider. Thank you.
Thank you, Honourable Member. We will examine that in stages. Applications are indeed constantly coming in, so we will examine them and look at whether it is justified for them to continue, except if there is another project there that requires, for example, river enlargement for flood mitigation. At that time, we will face a bit of a problem. But if not, so far we have not rejected development. We only stipulate that it must be environmentally friendly to protect the quality of sewage water and so on. As for the allocation the Honourable Member mentioned regarding the budget, we are focusing on food security from the Department of Agriculture. As for the budget, if we look, do not only look at UPEN, there is RM7 million, and under the Department of Agriculture there is another RM9 million, and RM11 million more for development. So RM7.9 plus RM11 million, there is quite a lot of allocation that we are focusing on for agricultural development in the State of Selangor. As for Pelabuhan Klang, regarding, I have already answered on the street light issue and the maintenance budget issue. As for Teluk Gong, 04304, the total for this year, the project actually costs RM1.28 million, but because it is still at the early implementation stage, the consultant work and the early works, that is what is allocated this year, RM8.5 million. The project has started, but that does not mean the project is RM8.5 million. We estimate it that way for this year. The cost for early works and also consultation works, that is what I meant by RM8.5 million for this project.
As for the InfraSel issue under Kumpulan Semesta, it is only its contract under JKR. There are two major contracts. One is a long-term contract, and the other is an annual contract, a centralised programme. Everything under the centralised programme is for JKR. For the long-term contract works, JKP, which involves road maintenance, is around RM8.8 million, that is its budget. The bulk is mostly the annual contract. The annual contracts are all tendered. Under the long-term contract, it is managed under the State Government, which has handed it over to InfraSel, a subsidiary of the State Government. InfraSel has formed and trained about 65 small contractors by district across Selangor to manage the road sections respectively, whether involving potholes, road furniture, road cleaning, and so on. It has its SOP and its KPI.
So in implementation, they monitor and ensure these contractors carry out work according to the specifications of the SOP that has been set. There will indeed be one or two contractors who are slack, we do not deny it. There are some we have warned, and some we have replaced. But overall, this is monitored by InfraSel and also JKR itself, in terms of implementation of the works. So there is no issue of competition or anything like that, because this follows the specifications and the standard schedule of rates that have been set for implementation. As for the flood-mitigation issue for Pelabuhan Klang and Pulau Indah, we have the Pulau Indah project at Sungai Kembong, RTV at Sungai Kembong, which has been approved, and the tender was on 15.12.2022. That is the tender. That is why we have long mentioned this project, RM10 million, but the tender is new because it is engineering, the design has now been tendered, and I expect that in the first quota next year, the project for the Sungai Kembong Flood Mitigation Plan will begin. As for Sungai Pinang, too, RM4.5 million, also tendered on 18.12.2022, and it will begin. Both of these take 18 months to complete, the completion period for the RM4.5 million project. Sungai Kembong is RM10 million. That is for the project...
Upgrading of water gates. Apart from flood mitigation, to upgrade water gates, there are two more water gate upgrades.
They actually contain all these components. When we mention the Flood Mitigation Plan (Rancangan Tebatan Banjir, RTB), its components include deepening, widening, bank reinforcement, embankments, sluice gates, and sometimes pumping systems. So we have to look at its components, because the Flood Mitigation Plan RTB is not just one thing. It involves many components according to the needs of each location. Another very important point I want to mention here is the study on the effects on our sea walls caused by waves or rising sea levels. I have already said that we have roughly embankments along our coastline, about 200 kilometres, from Sabak Bernam to Sepang, 200 kilometres. A study is being carried out and is expected to be completed in March 2023. This study will show, and we will see, how these existing embankments can withstand, in terms of their height, their size, their materials and so on, so that we can upgrade them. This study is being carried out, and I think it is important to ensure that the implementation, or rather now that we are facing climate change, can be addressed with this detailed study and its implementation. This is being done at a cost of RM1.5 million and will be completed in March 2023. We will be able to share everything with the Honourable Member later, everyone involved in this coast, regarding what we need to do with the embankments along our coastal areas. Kuala Kubu Baru, the Honourable Member for Kuala Kubu Baru touched on flash floods. This is the same, the project is...
Honourable Pandan Indah, just briefly. Regarding B148, the Kerja-kerja Menaik Taraf Jalan Teluk Gong upgrading works, can we get the details later on what the RM8.5 million is going to be spent on, because we support it to be passed, but we want to see what it will do with RM8.5 million for the year 2023. A written breakdown.
Yes, we can, but let me tell you here, it is the initial work, the work of appointing consultants, which is very expert. For Kuala Kubu Baru, that is flash floods. The project in question being pursued is the Sungai Batang Kali Flood Mitigation Plan project worth RM10 million, which will start with tendering in February 2023. RM10 million tender in February 2023. This project involves various aspects and components for resolving floods in Batang Kali. As for the district enforcement officer position, whose duties are currently being carried out by the Gombak District Engineer, it will be filled in the first quarter of next year. We are waiting, and we have already requested, to fill the position. As for Sungai Aur, for Sentosa, Sungai Aur is actually included in the Sungai Aur retention pond upgrading project. There is already RM5 million, it has been approved, and in November 2022, a tender was recently held, and the work will begin shortly. As for when the tender will start, we will take about 24 months. It involves upgrading the pond and also the structures mentioned that are not functioning, and also repairing and upgrading the drainage over a length of 500 metres, which is also involved in upgrading this Sungai Aur retention pond. So, regarding the issue of Meru, I have already said a lot about Meru. We will take note of the road issues raised earlier. Seri Setia too, the same, Jalan Kelang Lama and so on, I have also taken note. If I were to go through each one, it would take a long time. So we take note of what has been raised. As I said earlier, we have to look at priorities, which first and which later. And we will focus on what really needs road works. We have methods to determine it in terms of traffic and other factors. I understand every...
My place needs you, Honourable...
Of course, Honourable Member, you certainly want to ask, I understand. If possible, it is indeed so, but we have constraints, so we will try to do our best to fulfil...
Mr Speaker, eh, the Honourable EXCO. Just to add a little, perhaps I missed earlier, regarding development, I asked for suggestions. At Jalan Hamzah in Kampung Budiman leading to Setia Alam, the road there is extremely bad, but I am not sure whether it is under JKR, just as an addition.
We will take note of what has been raised. There is indeed a lot to say about road matters, road maintenance, drains and ditches. We will take note, we will examine it carefully, and Ijok, I did not answer earlier either. Regarding the water quality issue, but for Ijok's information, Honourable Ijok, our Air Selangor water treatment is indeed subject to the United Technician, as it turns out, WHO requirements. We do not breach that, because our licence would be revoked. In terms of water treatment, we do comply with and meet the requirements set by the WHO. The only problem now is the internal piping system. That is one problem, because in older buildings, when the internal water pipes rust, the water is no longer suitable for drinking from there. That is why it is not available there. But if we can reinstall our piping system, at best, there would be no reason not to drink that water. The quality of drinking water, portable water, this treated water, indeed meets WHO standards. Only when it enters the piping system does it cause the water to be downgraded. So we are going through a process of replacing pipes, whether external pipes or internal building pipes. This is a lengthy process that requires a lot of funds and must be done in stages. We are implementing it, and it must be implemented to ensure the water quality improves. Thank you.
I now invite Kajang.
Thank you, Deputy Speaker. I will only answer four Assemblymen who raised issues during the debate on the Development Budget. For the Honourable Bukit Lanjan, who raised the issue of the RM500 thousand allocation for the Fixed Cost Fund for Orang Asli Affairs (Jana Kos Tetap Hal Ehwal Orang Asli). For 2022, an allocation of RM500 thousand has already been disbursed for the repair and rebuilding of Orang Asli housing, upgrading road and lighting infrastructure.
Besides that, allocations were also disbursed for applications to organise the Orang Asli Community Games. For the information of the Honourable Bukit Lanjan as well, the Selangor State Government has already allocated RM1 million for the gazetting of land in Orang Asli areas in Selangor. Apart from this RM1 million, we also allocated in 2022 an allocation of RM1 million to build new houses and also repair damaged houses in Orang Asli villages in Selangor. In Selangor we have 74 Orang Asli villages, where the problems they face are infrastructure, including roads, and houses that they constantly find damaged, and for the new generation they need to build new houses.
As for the problem of the Orang Asli village of Desa Temuan, the problem of handing over the village assets for the past 3 years until now, yes, I also do not know what the problem is, what has not been resolved. So, the answer I received is that the State Government, I myself will hold a meeting with the developer to ensure the outstanding issues are resolved. This is because the feedback I received from the developer states that there are several claims that are not in the agreement, and the developer also informed me that there are assets that have been completed but not yet handed over because they are still in the approval process by JUPEM (Department of Survey and Mapping Malaysia) and also PTGS (Selangor Land and Mines Office). The process of handing over the compensation assets requires negotiation and joint review with the agencies and departments involved, especially JAKOA (Department of Orang Asli Development). Therefore, the State Government will help the residents of the Orang Asli village of Desa Temuan to expedite this handover process.
As for the question raised by the Honourable Ijok, about proposing that the Government relocate the Sabak Bernam Branch Environment Office to Kuala Selangor because Kuala Selangor has already been upgraded to a municipality. It has been informed that this proposal has already been included in the strengthening plan of the Department of Environment (JAS) for further refinement by the Public Service Department (JPA) in the near future. As for the problem of the case of the factory burning charcoal in Ijok, for this I will hold a meeting with JAS and also the Local Authority, Kuala Selangor Municipal Council, to resolve this issue. The important point is that if it causes pollution problems, we will not compromise, and we will seize it and the activity will not be allowed to continue.
Thank you. This burning problem, environmental pollution, indeed often occurs in Ijok. Ijok wants to know how the government will take action to curb this problem. Ijok wants to ask, how many factories have been closed, how much land has been seized, that is very important. We must impose a penalty that is commensurate with the problem to the community. But to them, perhaps just paying a fine is enough. So Ijok wants to ask, how many factories have been closed? How much land has been seized in Ijok?
As this involves figures, I will not be able to give them at this time. I will provide them in a written reply because this involves figures that are not in my hands at the moment. And to answer the question raised by the Honourable Bukit Lanjan, Kampung Tunku and Balakong regarding the Shah Alam Gallery at Taman Tasik Shah Alam. So the Selangor State Government, through the Shah Alam City Council and Tourism Selangor, will plan to upgrade the Shah Alam Gallery to attract domestic and international visitors, especially in terms of providing space for organising various events that can be held in the area. In addition, tourism promotion will be carried out digitally and online in collaboration with Tourism Selangor, and engagement with tourism industry players to commercialise the gallery as a mandatory stopover point for tourists. That is all, thank you.
I now invite Paya Jaras.
Thank you, Honourable Deputy Speaker. There are several questions raised by our representative, our State Assemblyman, especially the Honourable Bukit Lanjan, who raised the issue of skateboards, correct? Skate parks. I think skate parks depend on the demography of a place. Perhaps in the Bukit Lanjan area the need may exist, while elsewhere there is none at all. We do not have a standard policy on skate parks, but in any case, for the information of the Honourable Bukit Lanjan, in 22 we repaired a skate park in USJ at a cost of RM100,000.00. The cost to build an ordinary skate park is RM300,000.00, while the cost for a skate park with international specifications is nearly RM500,000.00. This is quite costly. However, if the Honourable Bukit Lanjan has an old or existing skate park that needs repair, we can reassess the situation. So for new areas, our policy is that if building a new skate park, it may not cost more than RM100,000.00, and if building new, RM200,000.00. If repairing, one hundred thousand; if building new, two hundred thousand. That is the policy we approved in March 2022.
In that case, I humbly request the good offices of the Honourable EXCO to allocate several new skate parks in my area next year.
Yes, it depends on the location. The Honourable must help us find a suitable place that we can gazette as a sports site. Another matter raised by Bukit Lanjan is related to the development of SUKMA sports. Is there no formula for us to win back in SUKMA next year? Yes, we will focus on sports that have potential based on the existing financial allocation. If we want to spend the whole amount on all sports, we cannot afford to spend heavily on those sports. So we will set targets for sports where we have the potential to win gold, and we will focus on those sports. All of this is under the management of the Selangor State Sports Council. Kampung Tunku also raised the matter of sports adoption. I believe it relates to Kampung Tunku, not the foster parenting of athletes, but facilities, namely facilities at the local authorities (PBT) providing assistance to our athletes. I think most PBTs have provided good space for our athletes, especially our paralympic athletes from the OKU (persons with disabilities) group, and I thank them. If we are given other needs, we will engage with the local authorities to use the existing facilities to help our athletes. Seri Setia also raised a new matter, as in the previous question, our policy is the same for construction other than football fields, RM100,000.00. For new construction it is RM200,000.00. If this is within the existing budget that can accommodate facilities in the Seri Setia State Constituency, God willing, we will review the plan. Thank you, Honourable Deputy Speaker.
I now invite the Honourable Batu 3.
Thank you, Honourable Member, Mr Deputy Speaker. I will respond to the Honourable Member on several matters. The first is from Kota Anggerik. Is there a special allocation for us to repair slopes and so on? I would like to inform you that, in fact, under the budget or under PK15 at this time, there is no allocation to repair slopes, structures or subsidence. I have in fact raised with the Ministry of Housing and Local Government (KPKT) that a specific budget is needed because it involves a fairly large allocation. So for that, I cannot respond at this time. We will only take note. If incidents occur, they will be handled on a case by case basis, and the allocation is not under PK15 but under other allocations. For the issue raised by Kota Damansara, the Skim Ceria issue, Insya Allah I hope all Honourable Members, as I answered the other day, will make use of the portal or the payment method through e-CERIA. That is the management or application method for the Skim Ceria, to ensure that all related issues in beautifying areas are channelled through e-CERIA, so that we can identify which priority places we want to paint. But in this budget code we have placed RM7,000,000.00. Dato' Menteri Besar has announced an additional RM5,000,000.00, which will be given alongside what we have also done under the Bajet Penyayang. That means there is one additional sum; it is not in this object code. The next point I want to respond to specifically, the last one, is from Kuala Kubu Baharu concerning VOT 15004. I want to mention here the case raised by Kuala Kubu Bharu, namely Kampung Melayu Rasa. If we look at the cases of neglected projects in the organised villages across the State of Selangor, the solution models differ from one another. So for the case of Kampung Melayu Rasa, which originally involved 168 units, namely 109 detached houses, 52 semi-detached houses and 7 shophouses. What we found at the beginning, when I chaired the meeting, was that these lands had not yet become owned property. So the first process was to open up the matter. We found that only 31 had ownership titles, and the rest did not. What we did was open it up and give notice that anyone with valid documents must come forward. After the period we gave had lapsed, we finally confirmed in the State Executive Council (MMKN) meeting that 71 lots had submitted proof of documents, and these are the lots to which we will give ownership, and ownership has already been given. As for the remainder, 66 were returned to the government because there was no ownership. After that, what was the second process we carried out? The second process was to reorganise the units or the owners of these units, and this has also been resolved. That is, we restructured the existing arrangement of the units, which were scattered in one place. There is Lot A and Lot B; we first used all of Lot A. All of these 102-odd units, Honourable Member, have now been placed in one lot, so Lot B has been cleared. Thus the agreement on the lots to be filled by all those who have ownership has also been settled. So what we call the slight difference in this solution is that we perhaps do not need to use the place mentioned. If we look at the remaining place after we provide the allocation, as the Dato' Menteri Besar mentioned in the budget presented, we have a balance of RM4,445,163.12. So since there is a balance, we do not need to use it, once we have appointed or submitted proposals to three rescue companies, which must submit the best solution method. We have detailed the solution of what we want them to do, including infrastructure issues such as the IWK road or ... and so on, which we have included, and we will offer the plot that we have cleared. To answer this question, we are not yet certain whether we need to include the budget, which can be taken from exactly ... I can only answer after they have submitted their proposals, after we have finalised or given a final decision on the matter. In fact, this matter was chaired by me at a meeting on 22 November 2022, just recently, and Insya Allah, let us pray that another neglected programme in Selangor, namely Kampung Melayu Rasa, can be resolved. So six out of eight, Insya Allah, have already been resolved. Thank you, that is all from me, Mr Deputy Speaker.
I invite the Honourable Kinrara.
Thank you, Mr Deputy Speaker. I only want to respond to one matter raised by the Honourable Meru earlier, concerning foreign nationals who are around Meru, who are trading around Meru. For the information of the Honourable Meru, according to enforcement statistics supplied by Majlis Perbandaran Klang:
YEAR | FOREIGN NATIONALS | LOCAL CITIZENS | TOTAL SEIZURES 2020 | 164 | 69 | 233 2021 | 107 | 68 | 175 2022 | 98 | 37 | 135 TOTAL | | | 543
The total number of seizures over three years for foreign nationals is 369 seizures and for local citizens is 174 seizures. That is all, thank you.
I invite the Honourable Sungai Kandis.
Thank you, Deputy Speaker, for giving Sungai Kandis the opportunity to provide some feedback on matters raised by Hulu Klang, Banting, Sungai Ramal, and that is all. Hulu Klang raised the proposal to implement the development of schools, mosques and surau based on the Syariah concept and the needs of the community. The overall construction of schools, mosques and surau in the State of Selangor is built on the principles of the five Syariah objectives, namely protecting life, protecting intellect, protecting religion, protecting property and protecting lineage. These matters are instilled in every education module and activity conducted. The development planning of religious schools and mosques carried out by JAIS is to provide for public needs for schools and mosques in an area. This is further strengthened by several criteria that are seen as the basis of planning that is determined. Among them:
1. Providing more complete schools by replacing schools that are not conducive due to unmaintained conditions, such as classrooms without walls, classes on surau verandahs and surau five-foot ways. Situations like this exist at KAFA Bandar Saujana Putera, Kuala Langat, KAFA Bandar Mahkota Kajang and KAFA Taman Kemuning Kuala Langat, Kota Kemuning Klang and Bukit Rimau, and so on.
2. Providing schools in more suitable places and localities to replace places that are not suitable for use as a school providing education to children. This is because some schools currently operate by renting industrial sites, such as KAFA Kota Warisan, and schools renting terrace houses, such as KAFA in Puncak Alam 2 and Puncak Alam 3.
3. Providing schools in residential areas that need religious schools for the religious education of the children of the local community, such as in Taman Pristana, Taman Mokis, Taman Desa Coalfields, Kuaters Penjara Sungai Buloh, Bandar Saujana Utama and Taman Hill Park.
4. Replacing schools with dilapidated facilities that were built of timber, such as at SRA Jenjarom, Kuala Langat and SRA Bukit Sentosa Phase 1, which were originally KAFA status and were built through donations and contributions by certain parties.
5. The construction of five secondary religious schools is based on the status of SABK, Government-aided Religious Schools, which need to be equipped with basic necessities, including hostel buildings to accommodate the intake of new Form 1 students. Related schools include Sekolah Agama Menengah Pasir Panjang and Sekolah Agama Menengah Tengku Ampuan Jemaah Sungai Besar. Likewise at MITS, Maahad Integrasi Tahfiz Selangor, basic facilities need to be provided for student use.
6. Sixthly, as for mosques included in RMK 12, these are due to the needs of the local Muslim community. Development in the relevant areas that require a mosque to be built, and the building capacity to accommodate worshippers, with the mosque to be built in the area.
Banting raised in the debate last Friday the allocation of RM500 thousand for surau. The management and action of repairs to surau in the State of Selangor are not only based on complaints, but more importantly based on planning and review through the District Islamic Affairs Office. Based on the allocation provided, it is used to repair existing damage. JAIS will use merit in carrying out the repairs. Priority will be given to matters related to the safety and comfort of worshippers, including worship facilities, including the prayer hall area, water supply and toilets.
Secondly, matters involving damage: if not repaired immediately, bigger problems will occur, such as leakage, cracks involving the building structure and electrical systems. If the allocation provided for surau repairs is insufficient, JAIS will transfer allocations from other JAIS miscellaneous votes. As for facade matters or damage that is not urgent, and non-critical damage, these will be postponed but will also be given attention. Thus, the repairs managed by JAIS now, in addition to complaints that will be refined, also involve engagement between the District Islamic Affairs Office and the Religious Primary Schools, mosques and surau throughout the State of Selangor.
As for Surau Al-Amin, Bandar Mahkota and Surau Al-Firdaus, Banting, which were raised in the debate, each has received a refund of part of the telecommunications tower rental, amounting to 33.3% of the rental rate from JAIS, from January to September 2022, as decided at Meeting No. 1 of 2022 held on 5 October 2022. Besides the income from T-Jari that is returned at 33.3%, surau may apply for repair or maintenance assistance from other sources such as the Selangor Zakat Board (LZS) and public waqf fund donations in cooperation with the Selangor Waqf Corporation (PWS). Applications may be made by submitting an application letter together with a proposal paper for the implementation to be carried out.
Regarding the matter raised by Sungai Ramal, air conditioners, yes, that is correct. For the development budget allocated to JAIS, the allocation is only permitted for minor improvements and building damage repairs, whereas the purchase of air conditioners is an accessory purchase and is categorised as a building asset. It cannot use the development allocation because it clearly contravenes the department's financial management procedures. However, the surau are advised to seek public funds, including referring to the Zakat Board for the various assistance provided.
Taman Medan, Taman Medan asked about the use of the JAKESS Building. So far, the building is under the supervision of the Selangor Syariah Judicial Department (JAKESS) and, if there is a need, the party concerned must hold discussions with JAKESS to use the training venue. And then there was a question from someone, I don't know who asked this, but there is an answer. Regarding, oh, Kota Damansara. Kota Damansara asked why the approved project only received a token RM10.00. For the new mosque construction project at Kota Damansara 2, the token of RM10.00 recorded is because the State Government, through UPEN (State Economic Planning Unit), has cut the allocation, and the JAIS Development Unit informed that the allocation was cut for the year 2023. After the budget cut, JAIS only received a sum of RM65 million for development vote P14 for the year 2023. For the issue of a token RM10.00 only for the construction of this mosque, JAIS will use the method of transferring allocation from miscellaneous votes for the preliminary works of the mosque construction by JKR Selangor for the year 2023. That means the project, insyaallah, will continue but perhaps using the priority mentioned earlier, to carry out the preliminary works. However, this project is still ongoing, as it only uses an allocation of around RM500 thousand, and JAIS plans to channel the allocation through the miscellaneous votes of the department. Insyaallah, there is still hope, Honourable Member. Okay, that is all. Thank you.
I invite the Most Honourable Sungai Tua to provide an explanation.
I thank the Honourable Members who took part in debating the entire RM1.2 billion that we have allocated for development programmes in the State of Selangor. Looking at the whole under PK01, the Office of the Menteri Besar, there is approximately RM895 million, which covers the Standing Committees and the programmes that we have planned and arranged, and a balance that we can see overall, with RM49 million given to economic development programmes. The rest relates to several programmes that we included, including the Social Development Programme and the Development Programme for Women, Welfare and Health, which are among the largest allocations, at RM191 million. This shows some of our focus and attention on women in particular, with several initiatives that we have planned and arranged.
Apart from that, the remainder is distributed department by department. Among them are the Public Works Department, the Forestry Department, and the Irrigation and Drainage Department. I feel my EXCO colleagues have answered clearly, carefully and in detail regarding the overall situation and the existence of our economic development programmes, which I said we would work to cushion against any issues and potential economic downturn that may occur next year. If we look at the development agenda as a whole, it gives attention to the economy and also gives attention to welfare programmes. With the balance that we have arranged, this will together bring about and ensure growth, with the English word "growth" by permission, or economic momentum, and that economic momentum will also become one of the cushions, or absorbers, of problems or issues relating to employment and so on that may arise as a result of the effects of Covid-19 and the measures that were taken.
Honourable Members all, I wish to answer in detail the several questions that were raised. The first, I wish to answer about Sentosa regarding the allocation for entrepreneur development. For the ISID programme next year, overall we will spend approximately RM1.7 million, of which RM1.3 million is used for development and management programmes, and RM402 thousand will be given to manage ISID directly. As for the SITEM programme, which includes an entrepreneur training programme amounting to RM1 million, RM131 thousand will be borne by HIJRAH, since this programme is placed under the umbrella and under the machinery of HIJRAH as a whole.
Honourable Members all, recently I, together with Mohamad Yunus, who just received an Honorary Doctorate from Universiti Putera Malaysia. He has given certain suggestions, and our team from HIJRAH also met with him. He is among those who proposed how the Micro Credit programmes in Bangladesh, which are very well known, work. Dr Mohamad Yunus is a noble, and we are working to place him in the seat of the Menteri Besar of Selangor at Universiti Putera Malaysia. He suggested that programmes like HIJRAH or ISID and so on should not operate as government agencies, but instead operate as banking institutions.
If we look at today, in fact, apart from HIJRAH we have programmes such as Selangor Advance, which carry out activities like a banking institution, implementing a factoring programme, by permission. That is why I believe we already have the ingredients, we already have the information, but how, is a study, analysis, benefit analysis, cost benefit analysis needed, is it appropriate for HIJRAH, Selangor Advance and several programmes that we provide in the form of loans to operate as a bank, because we have found there are effects. Among the effects is the sluggishness or difficulty we face in recovering repayments. Although the repayment amount reaches 80%, 90%, over time some have become increasingly sluggish in paying. I feel this is a good suggestion, that we should examine it, and I have asked for HIJRAH and MBI to be included to go together to look at these programmes as a whole.
Second, from Bukit Lanjan, regarding the Taman Rakyat. Previously, the proposed location for the Taman Rakyat was near the Selangor State Library or PUSTAKA Raja Tun Uda, which is located in Seksyen 13. That was the first proposal put forward, so that the second phase of the State Public Library Corporation would be expanded together with the Taman Rakyat in the area of Seksyen 13. However, there was a counter-proposal, especially from discussions with MBSA and so on, to look at the whole area of Tasik Shah Alam together with Padang A and Padang B, which could also be developed as a Taman Rakyat that is more accessible compared to Seksyen 13. However, this project has received very high interest and attention from His Royal Highness. We are about to submit both modules and both designs of these two proposals, and both are in fact doable, can be done and can be carried out. Once we have the results and can choose which is best, the State Government will proceed, because PUSTAKA Negeri or PUSTAKA Raja Tun Uda is among the most modern libraries in our state and our country, and it receives much attention from many people, but its location is very difficult. That is why we have to make the parking area and so on, and
if we want to enlarge the surrounding area, we also provide a sufficient parking lot after we enlarge or carry out the second phase of the Selangor State Library, which we will submit later.
Regarding several libraries, I have heard about the Hulu Langat Library. We are examining every moment and time whether these libraries can be carried out, and we are waiting for the CF, or Certificate of Fitness for Occupation, from the Public Works Department, because these libraries were in fact built through cooperation with the advice and scrutiny of the Public Works Department. Once it is complete and finished, we can obtain the CF and the handover, and we can proceed and carry it out. In addition, every time the Library Committee meets, we find that these libraries have experienced some delays, and so on, because of the contractors who were selected and some changes and transition processes. I will inform you later. As for Hulu Langat, we are waiting. Recently in Kuala Langat, if I am not mistaken, we have carried it out and launched it, and next will be at Tanjung Karang, in Kuala Langat, based on the allocation for a fairly large library, around RM9 million, apart from the purchase of assets that we have completed for the state library programme.
Honourable Members whom I hold dear, through the Standing Committee on Education, we can see that.
The Most Honourable Member, time. Thank you, Honourable Members. The time has reached 4.30 in the afternoon. I adjourn the House until tomorrow, 6 December 2022, Tuesday, at 10 in the morning. The House is adjourned.
(THE HOUSE ADJOURNED AT 4.30 P.M.)