Selangor · 22 November 2023
15th Assembly, 1st session, 2nd meeting · 295 turns · 33,325 words · official PDF ↗ · Digital Hansard ↗
ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.
(Opening)
Good morning and peace be upon you. The Order of Business for the Second Meeting of the First Session of the Fifteenth Selangor State Legislative Assembly on 22 November 2023 begins with the recitation of prayers.
Bacaan doa.
Oral QuestionsQuestions
The next item on the Order of Business is questions.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, peace and greetings, and good morning. We begin this morning's sitting with oral questions. Question No. 83 from Bandar Baru Klang has been answered together with Question No. 46. Accordingly, I invite the Honourable Member for Bukit Melawati.
Thank you, Deputy Speaker. My question is number 84.
Oral Questions — 84. Upgrading of Damaged Futsal CourtQuestions
84. To ask Y.A.B. Dato' Menteri Besar:-
a)
Is there a limit on applications for the repair of dilapidated futsal courts for each State Legislative Assembly constituency (DUN)?
b)
What is the total allocation disbursed to local authorities (PBT) for the repair of infrastructure such as these futsal courts?
Thank you, Mr Speaker. Thank you to Bukit Melawati. To the Honourable Member, with reference to the decision of the State Executive Council (MMKN) meeting No. 8/2022 held on 30 March 2022, which was confirmed by MMKN No. 9/2022 on 6 April 2022, the MMKN agreed to decide the following matters. First, the upgrading and rehabilitation of existing sports infrastructure with a maximum limit of RM100,000.00, except where it involves the cost of rehabilitating a football field, with a limit of up to RM250,000.00. Second, the construction of new sports infrastructure with a maximum limit of RM200,000.00, except where it involves the cost of constructing a new football field, with a limit of up to RM250,000.00. The upgrading and rehabilitation of sports infrastructure under sports associations involved with the Malaysia Games (SUKMA) totalling RM1,000,000.00, on condition that the facilities are also opened to the public for use.
For part (b), with reference to the decision of MMKN No. 6/2021 held on 17 February 2021, which was confirmed by MMKN No. 7/2021 on 24 February 2021, the implementation of the upgrading, rehabilitation and new construction of sports infrastructure under the Selangor State Sports Council was approved. Accordingly, there is no channel of allocation to PBT for rehabilitating infrastructure such as futsal courts, because the Selangor State Sports Council will carry out the rehabilitation works in line with the MMKN decision. However, PBT also make allocations at PBT level to rehabilitate and maintain sports facilities in their respective areas. Thank you.
Supplementary question. The relevant EXCO is not here. I would request that next time, if we become the Government, the EXCO who has to answer must be present in the House. Never mind. I will keep this supplementary question because the relevant EXCO is not here. Thank you, Deputy Speaker.
The next question is from Hulu Bernam.
Mr Speaker, a crow pecks at the serama chicken. My question is number 85.
Oral Questions — 85. New HousingQuestions
85. To ask Y.A.B. Dato' Menteri Besar:-
a)
What are the State Government's plans to add new residential areas in the Hulu Bernam DUN, especially affordable housing?
Thank you, Deputy Speaker. Thank you to the Honourable Member for Hulu Bernam for asking about the State Government's plans to add new residential areas in the Hulu Bernam DUN, especially affordable housing. For the information of the Honourable Member, the State Government always welcomes residential development projects in the Hulu Selangor District. As of 15 October 2023, there are 24 projects with 5,718 units of Rumah Selangorku that have been approved by the State Executive Council (MMKN) in the Hulu Selangor District area. Of that total, 1 project with 2,254 units of Rumah Selangorku has been approved in the Hulu Bernam DUN area and is in the planning process. For the information of the Honourable Member for Hulu Bernam, among the mukims where Rumah Selangorku has been built, mukim Serendah has the most. Secondly, Bandar Kuala Kubu Baharu, Batang Kali, Bandar Sungai Chik, mukim Hulu Yam, mukim Kuala Kalumpang and also mukim Ampang Pecah. Thank you.
Supplementary question. Thank you to the Honourable EXCO for the response given. I have a few questions regarding how the State Government plays a role in ensuring that the distribution of these affordable housing units between urban and rural areas is allocated fairly? Not equally, but fairly. Urban areas get some, rural areas also get some. Thank you.
Thank you, Honourable Member for Hulu Bernam. In fact, we also distribute these according to the studies conducted, because rural areas do not necessarily have high demand; sometimes demand is rather low, and so it may be more on the fringes of towns or in towns. So, to determine the construction of these affordable houses, it is based on the studies conducted, whether by PBT or by the developers themselves, and will be brought to the Selangor Housing and Property Board (LPHS) for us to consider. But usually Rumah Selangorku is also easy to market for rural areas. Thank you.
Kota Kemuning.
Mr Deputy Speaker, my question is number 86.
Oral Questions — 86. Senior Citizens and Special Persons (OKU) B40Questions
86. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the long-term plan for the senior citizens (Warga Emas) and B40 persons with special needs (OKU) in Selangor?
b)
What approaches are taken to help the poor and B40 groups apart from the general aid from the Department of Social Welfare (JKM)?
c)
What efforts are being made by the government to hold PAWE in all DUNs/Districts?
Question 86 has been answered together with question 34.
Can the Honourable Member give me the answer in writing later?
Boleh.
Okay, thank you.
Batang Kali.
Thank you, Mr Speaker. The monsoon season has ended. My question is number 87.
Oral Questions — 87. E-Commerce Strategic Direction Plan (NESR)Questions
87. To ask Y.A.B. Dato' Menteri Besar:-
a)
How is the State Government helping young people to optimise e-commerce income in rural areas in Selangor?
b)
What incentives are provided by the Selangor State Government for e-commerce traders to be included in the E-Commerce Strategic Roadmap (NESR)?
Mr Speaker, the E-Commerce Strategic Roadmap was introduced by the Federal Government as an approach to catalyse the digital economy and the e-commerce ecosystem in Malaysia. The objectives of this plan are to double the growth rate of Malaysian e-commerce through, first, coordination between ministries, agencies or institutions for the implementation and monitoring of the plan. Second, providing a conducive environment for e-commerce players to expand their businesses. And third, nurturing and developing local trade technology providers and online vendors so that they become recognised and globally competitive across the world. For the State of Selangor, the government has established programmes to assist small and medium enterprises (PKMS) in developing an e-commerce ecosystem in line with that roadmap. For young people, SIDEC has conducted a digital entrepreneur roadshow programme, which aims to provide exposure to the digital world. It provides assistance and encouragement to local companies in Selangor that wish to begin engaging in the e-commerce industry, for Selangor residents in different districts. This roadshow will also involve cooperation with community service centres, State Government agencies and digital industry players in Malaysia. The Selangor Digital Entrepreneur Roadshow has travelled to several districts such as Gombak, Hulu Selangor, Petaling, Kuala Selangor and Klang, bringing partners from industry players such as Shopee, Lazada, Touch n Go e-dompet, Hijrah Selangor, Epic Unicorn, TikTok Shop, Grab and Spree Commerce. The programme has received a very good response, with more than 1,000 people, most of them young people, taking part. In addition, other e-commerce related programmes that have been conducted include the Selangor E-Commerce Education Programme and the Selangor E-Commerce On Boarding Programme, and most of those who participated were young people. As with the programmes mentioned above, SIDEC has implemented the Selangor E-Commerce Education programme, which provides e-commerce knowledge free of charge to all Selangor residents. Throughout the period this programme has been run, from 2015 to 2022, more than 10,000 participants have joined it. In 2023, this programme was rebranded as the Selangor E-Commerce Accelerator, which focuses more on traders learning business development strategies, particularly digitally, in greater depth through training classes and mentoring sessions. At the end of the programme, each participant presents their business in front of judges, who assess each participant. In 2021 and 2022, the Selangor E-Commerce On Boarding Programme was implemented, which provides a complete ecosystem for selected traders to adapt their businesses digitally. Through this programme, the State Government provides subsidies for e-commerce pages and complete websites with hosting and payment gateways, to help traders enhance their brand and their businesses online. Only 100 traders are selected each year. Other incentives were also provided in 2021 during the COVID-19 pandemic, such as e-Tunai vouchers through the e-Bazar programme and matching grants through the Selangor Digital SME Matching Grant programme, which greatly helped SME and micro traders to adopt digital elements in their businesses as well as to sustain their businesses during the COVID-19 period. Thank you.
Soalan tambahan.
What steps are being taken by the Selangor State Government to ensure Selangor is on the NESR track, so that the State Government is on the track determined by the Federal Government in terms of the future market size in 2025, RM1.6 trillion? That is his question. Thank you.
I think the Honourable Member for Batang Kali did not hear my answer. Earlier I already answered regarding the E-Commerce Strategic Roadmap, which means the NESR introduced by the Federal Government. Earlier I also answered the three main objectives of the plan, and how the Selangor State Government can carry out various programmes to make the E-Commerce Strategic Roadmap launched by the Federal Government a success. I have already answered that all of these are part of the programmes held or carried out by the Selangor State Government to ensure more young people take part in and succeed in e-commerce business.
I mean the steps taken to help them reach the target of 1.6 trillion.
I have already answered all the steps earlier. Various programmes that have been
Those are programmes; these are the steps taken.
Various programmes that have been carried out by the State Government through SIDEC to ensure that the programmes that...
That's the Federal Government. This is the Selangor State Government.
Yes, that is a programme of the Selangor State Government through SIDEC.
Okay, if it's programmes, what programmes are they? What programmes does the Selangor State Government have?
Do you want me to repeat everything once more, or shall I WhatsApp it later? I will WhatsApp my answer to the Honourable Member later.
Thank you, Honourable EXCO. Next, the question from the Honourable Member for Sungai Kandis.
No.88
Oral Questions — 88. Repair of Multipurpose Hall of PBT DUN Sungai KandisQuestions
88. To ask Y.A.B. Dato' Menteri Besar:-
a)
There are community halls owned by PBT in need of repair around Andalas. Please arrange an inspection visit and immediate action.
Thank you, Deputy Speaker, and thank you to the Honourable Member for Sungai Kandis for asking about the community hall in Andalas. The Klang Municipal Council has four halls and eight village halls (balai raya) located under the Sungai Kandis DUN. The halls provided by the Council are the Klang Andalas Sports Hall in Taman Sri Andalas, Sentosa Community Hall, Kampung Jawa Community Hall and Klang Jaya Community Hall. However, only the Klang sports hall in Taman Sri Andalas has been privatised to a company since 2021, at a rental of RM3,500.00 per month. Meanwhile, three halls are managed by the Council, which handles daily cleaning and security at those halls. In addition, the eight balai raya built on government vacant land, which were taken over by the Council in 2008, are still operated by the Residents' Associations and the Council. In this regard, they coordinate the management and operation of the balai raya buildings independently, and this is not borne by the Council. To ensure the hall and balai raya buildings remain under the Council's supervision and in good condition, the Council conducts periodic inspection visits to ensure that the operation of these halls and balai raya is carried out according to the guidelines set by the Council. That is all, thank you.
Supplementary question. Thank you to the Honourable Member for Sekinchan. First, I would like to thank the Klang PBT, which took up our report the other day and promptly took action for the Orang Ramai hall in Taman Sri Andalas. But what I want to raise here is the Orang Ramai hall in Kampung Lombong, under the supervision of MBSA, in Kampung Lombong. This community hall urgently needs action to be repaired and upgraded, and I hope the Honourable EXCO can help with this. So if we want to make these improvements, I also ask that it be looked at from the perspective of flood infrastructure, because I'm afraid that when we do it, later floods will overflow. InsyaAllah, if my request can be expedited, I ask the Honourable EXCO to give an estimate of how long it will take to be done urgently. Alright, thank you.
Thank you to the Honourable Member for Sungai Kandis with your supplementary question. This question asks about the halls around Andalas. If Kampung Lombong is already outside Andalas. But never mind, since the Honourable Member is new, that's alright. I will also give clarification. For the hall in Kampung Lombong, insyaAllah I will ask the relevant authorities to come down to examine and investigate if there is a need and so on, and we will do everything we can that can help to improve all the infrastructure that we are able to. Thank you, Honourable Member.
Honourable Member for Kuang. This, is there any more?
I raised it there because the one at Sri Andalas is already running well. So if not, I have nothing else to ask. Sorry.
Thank you, Honourable Member. That is the best way.
We give Kuang a supplementary question.
Thank you, Honourable Deputy Speaker. I would like to ask the Honourable Member for Sekinchan, in his capacity as EXCO, about a hall. The issue is that this hall is not in Andalas. There is a hall in Taman Ehsan, under the management of the Selayang Municipal Council. At one point this hall was in a dilapidated condition. There were several complaints from residents about the condition of the hall, which was not being managed well. After several complaints were made, suddenly one day we residents learned that the hall had been privatised to be used for weddings and so on. I seek the Honourable Member's view: is it appropriate that for dilapidated halls under PBT, when they receive complaints from residents because the hall needs to be used by residents for various activities,
residents need it for all kinds of activities: badminton, aerobics and various other activities, yet suddenly the PBT decides to privatise the hall for wedding purposes, even though there is still a need for the hall by residents, including nearby schools that use the hall as a venue for sports competitions such as ping pong and so on. That is all, thank you.
Thank you, Honourable Member for Kuang, who asked about the hall in Selayang. As I emphasised earlier, our question is based on the original question about Sri Andalas. Suddenly it has turned around again to Selayang, and I think I will give...
Honourable Member, if you cannot answer, that's fine. Thank you.
I have already told you. Earlier you asked for views, and we will channel the views in writing, with the sound views. Thank you.
Thank you, Honourable EXCO. I invite Pelabuhan Klang.
Thank you, Honourable Deputy Speaker. Pelabuhan Klang's question is number 89.
Oral Questions — 89. Upgrading Project for Road FT 3218 Kampung Pendamar, Pelabuhan KlangQuestions
89. To ask Y.A.B. Dato' Menteri Besar:-
a)
When will the Public Works Department (JKR) upgrade Jalan FT 3218 Kampung Pendamar from 2 lanes to 4 lanes, given the increase in residential areas and population in the area, which has caused high traffic flow?
Bismillahirrahmanirrahim.
Thank you, Honourable Member for Pelabuhan Klang. Thank you to the Deputy Speaker. Pelabuhan Klang asked a question regarding the proposed upgrading of FT 3218 Kampung Pendamar from 2 lanes to 4 lanes. My answer is, anak manja anak bongsu, anak bongsu anak manja, my answer is short. Namely, there is no plan yet. It is not yet on the list.
Thank you. Continue with the Honourable Member for Bukit Gasing.
Thank you, Deputy Speaker. My question is number 90.
Oral Questions — Digital GovernmentQuestions
90. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the timeline for forming the Selangor State Government's services for this term?
Thank you, Mr Deputy Speaker. Thank you, Bukit Gasing, for the question that has been asked. The timeline for establishing the services of the Selangor State Government is based on the Government's existing plans. Of course, one important reference is the First Selangor Plan 2021 – 2025, in which the fourth framework on the fourth pillar is governance, and this will be in line with its theme, Selangor as a Smart, Liveable and Prosperous State. Second, we also have the Selangor State Secretariat (SUK) Administrative Digitalisation Strategy Plan (PPSUK 2021 and 2025). This is aligned with that direction, and the strategic direction for implementing the digitalisation of SUK Selangor services for the period 2021 to 2025 is in line with the vision of the SUK Selangor Strategic Plan 2023-2025 as a Selangor State that is "Smart, Caring and Resilient", and aims to encourage the use of technology in the public service, improve accessibility and improve the operational efficiency of the State Government. As we are aware, we will implement in stages what I mentioned as an example: important government transactions, especially in the land sector, have now been digitalised.
There is the E-Tanah programme. Based on the experience of past Menteri Besar, every week or every month we had to sign more than 400-500 files for consent for certain approvals. With E-Tanah, in fact, the Menteri Besar's task only requires a click to approve, endorse or reject, and it does not take a long time. On weekends, or in the afternoon or at night, to sign. That is one example. And, thanks be to God, this year Selangor is a state that has received recognition because our government services have been recognised as having 95%, together with Penang. More than 95% have digital payment centres or online payment gateways provided by the State Government's services. So, God willing, in 2025 we will be able to see in full the changes and digital transformation of government administration.
Supplementary question. Does this mean that by 2025, which is not far away, all services that must be done at the counter at any office of Selangor state agencies, for example the Land Office or local authorities (PBT), can be done online? If not 2025, what is the target?
The Honourable Member for Bukit Gasing, of course we are realistic about this, because we have to serve people from various levels of society. Although in the future all transactions at the front counters can be moved online, I believe the front counters will still need to be used or kept open for some years to come, because we want to give room for the transformation or transition to take place well. Part of the enablers, with permission, when we faced the pandemic, is that we only then thought of sending forms through Smart Box. That started at PTG, and thanks be to God, today I believe all Land and District Offices, or some of the Land and District Offices, have a Smart Box. So there are no longer incidents of people having to queue for a long time for submissions or for sending forms that previously required the front counter services. So I am confident that we will stick to that target by 2025, to shift everything, especially at the Land Offices and also at the PBT, where there are programmes and front-counter transactions to be moved online. But for the transition, we will give room so that we do not shock people or cause chaos, because many people may still be accustomed to conventional methods.
Soalan tambahan.
Please, Taman Medan.
Thank you, Honourable Speaker. I would like to ask the Honourable Menteri Besar: in our efforts to achieve this digital government, the main matter is certainly access, including access for us, the Opposition State Assemblymen, to the existing system, in which some of the State Government's programmes are registered digitally. Does the Most Honourable Menteri Besar intend, in this term, to give all Opposition State Assemblymen's Service Centres equal space and access so that we can also register the people of Selangor in any programmes organised by the State Government?
We will see, but the big issue is our readiness to accept policies. So, meaning, if the Opposition accepts the Government's policies, there is no point in being the Opposition. So these issues must be realigned again and discussed with the Leader of the Opposition. Thank you.
Thank you, the Most Honourable Dato' Menteri Besar. The next question is from the Honourable Member for Meru.
Thank you, Mr Deputy Speaker, my question is number 91.
Oral Questions — Food SecurityQuestions
91. To ask the Most Honourable Dato' Menteri Besar:-
a)
What is the State Government's policy on food security and the strategy for dealing with the crisis of shortages of basic necessities?
b)
How is technology applied in agriculture to increase production and quality?
c)
What steps have been taken to encourage agricultural entrepreneurship among young people?
Thank you, the Honourable Member for Meru. Mr Deputy Speaker, Meru asks a question regarding the issue of food security and the crisis, and the strategy for dealing with the crisis. The shortage of basic necessities. For the information of the Honourable Member, the Selangor State Government is always concerned about issues relating to agriculture and also food security, and I always cooperate between the State Government and the Federal Government to address issues relating to food security, whether in the short term or the long term. For the short term, the State Government has implemented several necessary measures to ensure that food, especially basic food, does not run short and does not cause price increases. Among what we have implemented is the Ehsan Rakyat Sales Programme (JER), which now receives cooperation from the Federal Government; we have rebranded it as Jelajah Ehsan Rahmah.
This programme, although seen as an initial step, one of the immediate short-term measures, actually helps the people a great deal. We have spent more than RM25 million this year and last year, to support the efforts carried out by PKPS, which is an agency under the State Government, as well as FAMA Selangor and Kohijrah. These three, we have, given their expertise in managing sales or marketing agricultural and food products, and they have helped greatly in stabilising several commodities or basic goods that are urgent necessities of the people, such as chicken eggs, chicken and rice.
This is a short-term measure. And for this year too, we will continue to support other measures that will be implemented further. That includes the programme to implement buffer stock, or stockpile, which was mentioned by the Most Honourable Dato' Menteri Besar in the budget speech. These are the measures taken by the State Government. For the information of the Honourable Members, the Honourable Member for Meru needs to understand that Selangor does not have the capacity to be 100% self-sufficient in all food matters. We do not have this capacity. If Selangor, in our efforts to provide food or agriculture, uses our land, we are always faced with competition for land for factories and so on. And sometimes when agriculture becomes unprofitable, the land will eventually be taken over for housing and for factories. That is why we identify lands under TKPM, and under, for example, the Northwest paddy area and also the SSAP that we implement, to ensure that these lands remain agricultural land. And indeed it is difficult for us to meet... I will give an example: if we go by the self-sufficiency rate for food in Selangor State, for beef and mutton we only supply 5% to the needs of the people of Selangor. 95% is imported from outside Selangor, and if we want to increase it to self-sufficiency, or to 100% self-sufficiency, it is very impossible for Selangor, because we depend on other states and also overseas. So if we want to increase it a little, that is possible, but to fully meet the needs is quite difficult. That is why in Selangor, what we emphasise in the Agro Transformation Plan (PETA) policy is high-value agriculture, so that we can contribute towards increasing the self-sufficiency ratio or SSR. That is all we can help with. However,
in implementing it, we also want to ensure that, besides contributing to the national SSR, at the same time we improve the status or income of our farming community. This is what we can implement in the State of Selangor. And under PETA itself, if we look at the Transformation Plan, apart from high-value agriculture, agriculture here means everything, including aquaculture and including livestock farming and so on. Another important component of this transformation plan is that we look at the implementation or programmes for agriculture and food as a whole, looking at the complete ecosystem. Because until now we have not looked at it. We have to look at it in terms of how the government looks at land use, in terms of providing seeds and fertiliser, in terms of production, in terms of warehousing and storage, and also in terms of marketing. We look at the whole picture, which is why, in the second part of the question on technology, we are currently focusing in Selangor on one important component of agriculture and food, which is the provision of seeds and breeding stock. We find that many agricultural issues in our country, I have to answer a bit more, we find that many of our country's issues regarding agricultural food relate to seeding and breeding stock. I will give an example: for prawns, which are famous in Selangor State, prawn farming, the seeds and broodstock actually come from Madagascar. A country that is far away. For tiger prawns. And when the pandemic happened, we could not import, so we only bought nearby in Thailand, which had low quality. The best goat breed, Black Belly Barbados (BBB), we have no one cultivating it for breeding. As for crops, even spinach we sometimes import from Taiwan. So Selangor will focus on this important component of agriculture, namely the aspect of seed breeding. And we launched last year five seeds developed by the Selangor State Government itself in cooperation with GWG. A company, the only company that develops seeds, which are two types of corn, two types of melon and one type of papaya. All of this we are implementing, and what I mentioned as MeloSel, that is one of the Selangor seeds. Owned by Selangor, our right. Which we have worked on for more than two years to produce these seeds. We will continue this to ensure... chicken too, we have seen that one of the causes of chicken issues is that the breeding stock of these chickens is old stock. So we, PKPS, have applied to sign an agreement with CP Thailand. This is a very large company in chicken production, so that we can carry out seeding, breeding of chickens ourselves, breeders and so on, to ensure that the yield of these agricultural products increases higher. These are among our efforts.
And in terms of technology, for the information of the Honourable Member for Meru, Selangor has been among the earliest states to use drones, use hydroponics, use aquaponics, use vertical farming, use various IoT technologies. The prawns that I just gave out recently also use 100% IoT, cultivated in a very small area but able to produce high returns. It is our entrepreneurship programme. What we have done will be expanded, and the IoT system was also developed by young Selangor people, not imported from outside. It was developed ourselves and managed well, and we will expand not only in aquaculture but also in crops using all this IoT.
For part (3) of the question, which asks about how to encourage young people, this is indeed one of our aims. If we look at young people, first, they like having gadgets. Second, they want high yields. Third, they do not want to get dirty, hot and so on. In fact, in agricultural technology this can be done. We can see several examples, for instance in Perepat, where we can see a technology in which they use something like a lab for agriculture, 50 types of high-value produce in Perepat, Kapar. Very successful, and young people will certainly be interested in this, and we have started. Under the Department of Agriculture, last year alone we provided incentives to 40 young recipients under AMSel, or Selangor Young Agropreneurs, amounting to RM374,930. That does not include what was allocated under UPEN, which we also provided for young people to encourage them to take part. And we will expand this further this year, and with the advancement of agricultural technology, it can indeed attract them. Because we farmers are getting older, we can attract them and also women to participate together in small areas with high yields. This is what we are continuing under the Selangor Agro Transformation Plan programme. Thank you.
Soalan tambahan
We will give Meru the floor first.
Honourable EXCO, to what extent is the Agro Farming programme effective among agricultural entrepreneurs, among young people and across Selangor State as a whole? How many people are involved? Thank you.
That is a rather specific question, but I can mention two major projects in which we have succeeded with young people. This is because our concept in giving assistance to young agropreneurs is not that we give and then leave them. Under the concept of Selangor agropreneur development, we guide them. First, we identify experts in a field, for example melons. We have a young person, I need not mention the name, a young person who has been very successful; he himself has succeeded not only in growing melons in greenhouses. The golden melon, the one that is yellow on the skin, he has been very successful not only in modern cultivation but also very successful in marketing. This, this is important. We must ensure that we do not guide our young people only to plant, but also help with sales. Because often they plant and then there is produce, but the marketing fails. So we look at the whole thing. And we have guided quite a number of young people under this programme on melons, including at Fruit Valley. And the second, which I mentioned just now, is the prawns, the freshwater crayfish or lobster that was mentioned. Freshwater. We likewise have a mentor who has succeeded not only in cultivation but also in marketing. These prawns are sold at around RM120.00 per kilo, and that is very insufficient. That is why I see that the big market can be marketed easily, and also with the help of this mentor, to make it succeed, and we will expand to other fields that we identify. Among them is mushrooms. This is one of the new things we will bring, which can be involved and is easy, small in area but high in yield. Thank you.
Sijangkang
Thank you. We face climatic variations, and now we are expected to face floods and storms that carry a risk of flooding. NAHRIM also projects that there will be drought from 2025 to 2035 and a reduction of water resources by up to 36%. What is the State Government's preparedness from the aspect of water resources? Even if we have good seeds, if there is no water, in the end nothing will come of it. So I see whether underground water resources may become the most important source at that time, with treatment so that we can treat water and make it a water source, the best way to guarantee food security, especially for our country. Perhaps in a drought, we cannot import from outside or from neighbouring states, but our preparedness in terms of the main food sources, the staple rice, sources of vitamins, vegetables and also protein, I think is something very important and depends on water. Thank you.
Thank you, Honourable Sijangkang, for asking that supplementary question. I did mention in this House in the last session that under SJAM Skim Jaminan Air Mentah, we are looking at not only the issue of flooding but also the possibility of drought forecast to occur in 2025-2026. That is what we are looking at. And we view water management not solely for the purpose of opening up land, but also for agriculture, which is an important aspect of food security. And for the information of the Honourable Member, for these crops there are types that use a lot of water and types that use very minimal water. And I can tell you that if new technology systems, especially hydroponics, are used, the water use is very minimal. It recycles the same water, so some crops will not need a lot of water. But open-field crops such as maize, which cannot be planted under a greenhouse, and also paddy, will certainly need a lot of water.
And under SJAM we have carried out a study on water sufficiency for the state of Selangor, which is why I mentioned that in the audit we conducted, apart from the seven dams we have and the off-storage reserves we have today, we have conducted a study on top of that. Apart from that, we have more than 100 ponds and lakes whose water quality is not too bad. Yes, they can be used. The total
water in these ponds, which we have just audited, is 34 million cubic metres, not litres, cubic metres or square metres. It is very, very large and can sustain 3 to 4 months if there is not a single drop of rain. These ponds and lakes can support our water needs, not only for drinking but also for agriculture, for 3 to 4 months. That means there is plenty of water. The only thing now is how we manage these ponds, because they are separate, they are not connected to rivers, there is no connection, and some are not functioning. So, as we have studied under SJAM, to ensure that when such conditions occur, water from the lakes and ponds can be used. This does not include HORAS 3000, which is even bigger. Thank you.
Thank you, Pandan Indah, Honourable Dusun Tua.
Thank you, Honourable Deputy Speaker, my question is number 92.
Oral Questions — Outbreak of Dengue FeverQuestions
92. To ask Y.A.B. Dato' Menteri Besar:-
a)
State the plans of the State Government and the PBT (Local Authorities) in resolving the problem of the spread of dengue fever.
b)
Taman Sri Nanding in Dusun Tua has become the number 1 hotspot with the highest number of cases in Malaysia. What appropriate action has been taken?
Thank you, Honourable Dusun Tua. This question will be answered together with the question from N33 (Taman Medan) No. 190 and N44 (Selat Kelang) question No. 296. The Selangor State Government is always concerned about the dengue outbreak, which threatens the well-being of Selangorians, where the main cause is the environmental conditions. Therefore, various initiatives have been implemented by the State Government with the cooperation of related agencies such as the Selangor State Health Department (JKNS), Local Authorities (PBT) and the District and Land Office, to reduce the number of dengue fever cases. Among the main factors contributing to the increase in these cases are the level of cleanliness and environmental conditions of backlanes behind houses,
illegal orchards, abandoned houses and vacant land, apart from the lack of public awareness in maintaining the environment.
For the information of all Honourable Members, a total of 50,703 dengue fever cases were reported up to ME-45, which ended on 11 November 2023. Therefore, recognising this fact, the State Government, together with the cooperation of the agencies involved and health volunteer bodies such as Sukarelawan Kesihatan Komuniti Selangor (SUKA), Communication for Behavioural Impact (COMBI) and Komuniti Sihat Pembina Negara (KOSPEN), has implemented prevention and control activities for dengue fever. Starting in 2023, the Selangor State Integrated Dengue Operation (OBDS) was implemented, and four districts that recorded the highest number of dengue cases, namely Petaling, Klang, Hulu Selangor and Hulu Langat.
Through OBDS, all agencies will work together to implement prevention activities such as the Destruction of Breeding Places (PTP), scheduled larviciding activities, Outdoor Residual Spray (ORS), Ultra Low Volume (ULV) spraying, gotong-royong programmes, and also advocacy activities with the local community through the distribution of pamphlets and repellents. Apart from the OBDS programme, the State Government and related agencies also implement other dengue prevention and control initiatives and programmes as follows:
The State-Level Dengue Action Meeting chaired by the Honourable EXCO for Public Health and Environment, to discuss the dengue situation across the whole of Selangor State with the proposed implementation of OBDS, which was also attended by various agencies such as JKNS, PBT, PKD, PDT and so on. Secondly, it also discusses the actions that need to be implemented at the District-Level Dengue Action Meeting chaired by the District Officer. Thirdly, joint action at community level by community leaders such as Councillors and Village Heads, together with leaders for joint action among the community. Next, intensifying the use of repellents and aerosol sprays among the community as well as the use of Mosquito Homes in outbreak localities. Fifthly, raising public awareness of the dangers of dengue fever and advising people to seek early treatment immediately if they experience warning signs of dengue fever, especially those living in dengue outbreak localities.
Therefore, this awareness is disseminated through health promotion carried out by the District Health Office by setting up health kiosks at risk locations, distributing health pamphlets, distributing abate, public announcements, hanging banners in outbreak localities through social media and so on. Besides that, empowering the role of residents and involved agencies through the establishment of teams such as Communication for Behavioural Impact (COMBI) and Sukarelawan Kesihatan Komuniti Selangor (SUKA) to carry out various dengue prevention activities (destruction of dengue breeding places and dengue health education) in the localities concerned. For example, the State-Level Mega Dengue Gotong-Royong Programme of Selangor in 2023, which was held at 16 locations throughout Selangor State, involved the participation of nearly 4,000 local residents. Apart from that, the use of the poison Bacillus Thuringiensis Israelensis (BTI) by the Local Authorities (PBT) to eliminate Aedes mosquito breeding, as well as specific programmes carried out by related PBT such as Operasi Lorong Belakang Bebas Aedes, Operasi Zero Larva and also the mistaway method installed in multi-storey residential areas. We also carry out the Selangor Aedes-Free at Workplaces and Quarters Programme and strengthen the Dengue-Free Schools Programme, and enforcement activities under the Destruction of Disease-Carrying Vectors Act 1975. Through this Act, enforcement action may be taken against individuals or premises owners who have the potential to become sources of Aedes breeding, through the issuance of notices under Section 8. Through this, compound offer action or premises closure orders will be taken. If there is a failure to comply with the Section 8 Notice or failure to pay the compound, court action will be carried out, and also enhancing vector control enforcement activities under Section 82 & Section 74 of the Local Government Act 1976.
For answer (b), for the information of the Honourable Member, the Kajang Municipal Council (MPKj), in cooperation with PKD Hulu Langat, has agreed on the division of areas for dengue control work under the administration of MPKj. MPKj only handles cases in the Kajang State Constituency area, while other DUNs are under the work scope of PKD Hulu Langat. Therefore, in this matter, Taman Seri Nanding is under the supervision and monitoring of PKD Hulu Langat for the scope of dengue control. However, MPKj and PKD Hulu Langat always cooperate in tackling the dengue problem occurring in the MPKj administrative area. The Council also assisted the Taman Seri Nanding area in gotong-royong activities by providing RORO bins, supplying aerosols to residents, and carrying out larviciding activities during the Integrated Individual Premises Enforcement Operation.
In addition, the Council has also conducted inspections together with residents' associations to places with potential mosquito breeding and has issued orders for the disposal of such areas. In facing the problem of the spread of dengue, the Selangor State Government is always committed to playing an important role through initiatives and actions based on the latest research, which are constantly being intensified. Apart from that, in terms of actions by the government, the Selangor State Government also calls on various parties, including the public, to jointly raise awareness and give serious attention to environmental care.
Supplementary question from Dusun Tua. Honourable EXCO, Taman Seri Nanding, especially Dusun
Tua, after the flood has also become the place with the highest dengue in Malaysia. I understand that. So especially in the residential areas, I myself have inspected and I have already applied to write a letter to the PBT so that immediate action is taken, namely drainage after the flood, clogged drains and also rubbish bins in commercial areas. Many are missing. During the flood the other day, it was not only traders or traders' goods that were swept away, especially in Taman Seri Nanding, the rubbish bins were all gone. Does the PBT or the State Government help to clean the clogged drains and supply rubbish bins? Thank you.
Thank you, Honourable Dusun Tua. This is usually under the responsibility of the Local Authorities together with the EXCO for PBT. However, from my office, every year we allocate a portion of the allocation for the issue and problem of dengue in each of the 12 Local Authorities that exist. So, as a suggestion, if there are any improvements or proposals that require allocation, they can be requested through the Local Authorities, so to speak. So, it is up to the Local Authorities if they wish to use the allocation provided specifically for dengue under my portfolio or through other allocations.
Thank you, Bandar Utama, Honourable Leader of the Opposition Hulu Kelang,
Mr Speaker, I submit question 93.
Oral Questions — Procedures and Regulations on Sand ExtractionQuestions
93. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the justification of the State Government in granting a special permit for 4B/4C rock material to Landasan Lumayan Sdn Bhd (LLSB) to extract river sand along the Klang River and sell the sand without paying rock material royalties to the State Authority?
Thank you, Hulu Kelang, for the question that has been submitted. The question being raised concerns the approval of the 4B/4C rock permit for Landasan Lumayan. Landasan Lumayan Sdn. Bhd. is a subsidiary of the State Government, a subsidiary of MBI, which has been appointed to develop and advance the alignment along the Klang River. And royalty payments still must be paid, and no special exemption has been given to Landasan Lumayan. And for the information of the Honourable Member, for Form 4B, the royalty paid is RM180 thousand, the toll payment is RM15,854, and the total amount payable by Landasan Lumayan is RM195,894. Based on the records, there has been no application from Landasan Lumayan to exempt the tax or exempt the royalty payable, thank you.
Mr Speaker, I believe the Right Honourable Member is aware that, according to the PTGS circular, all mining and sand sales activities on government land must go through KSSB. This is in line with the mandate of KSSB, which is responsible for extracting and monitoring rock material mining operations on government land, including rivers. And the explanation given by the Right Honourable Member just now clearly contradicts the mandate given to KSSB. Therefore my question is, does the State Government intend to review the mandate given to KSSB, because this is not the first case to occur in the State of Selangor. I believe the Right Honourable Member is also aware that 1,000 acres of government land in Bestari Jaya has been cultivated by KL Larut for a long time. In fact, the initial approval was for tin mining, but in 2020, MMKN granted an extension to KL Larut not only to mine tin ore but was also given approval to mine other rock materials including sand and sell sand from the 1,000-acre area in Bestari Jaya. So this once again violated the mandate we gave to KSSB, and such a large piece of land should have been given priority to a subsidiary of the State Government. So, what is the Right Honourable Member's position on this matter, whether to review and examine the mandate of KSSB again or to give consideration to private companies to mine and sell sand in areas on government land, thank you.
Thank you, Honourable Member. Basically, or in principle, the policy determined by the State Executive Council was set for certain controls. However, the matter raised just now is because Landasan Lumayan has been entrusted with the Klang River cleaning project. So if they implement that project and programme, I believe they should also continue with some of the dredging and river cleaning work, together with what we discussed yesterday at length, and some of the outputs extracted are not all sand. What is extracted is mud mixed with rubbish, and sand is only a small portion, and if we extend it to Kumpulan Semesta, it will further prolong the processes that should have been implemented.
Therefore, such approvals are special approvals made by MMKN from time to time, in line with the track record of KL Larut raised by the Honourable Member in 2020. Based on their experience, the current conditions at the site, and we also want to complete the HORAS ponds. So what was done involved two special cases decided by MMKN based on justifications submitted by the land offices, as possible and so on. And that is a decision specific to two matters. But the others that we have determined continue under Kumpulan Semesta so that they can continue the government's intention, especially the control of the extraction of rock materials and sand from our state, especially on government land. Previously we did this on a blanket basis, but in the current term, with the Honourable Member, we have opened up space for private companies on their own land. But on government land, this is only specific to one or two cases based on current circumstances, thank you.
Thank you. Next question, to supplementary questions?
Supplementary question. Thank you, Mr Speaker. I think this was also in my debate, where I raised the matter of approval and re-purchase arrangements for mining to KL Larut, because I found that in the record it states that the Lands and Mines Office also rejected the re-application from KL Larut when its contract ended. I want to know what other justifications there are, because the Right Honourable Member just mentioned that among them is the justification from the recommendation of the Lands and Mines Office to continue the purchase arrangement with KL Larut, thank you.
Thank you. The application was made by KL Larut and is in the answer that has been prepared. Yesterday there was no time because it was lengthy. We discussed other matters.
Applied for renewal of ML1/2015 and ML 2015 to the Selangor State Land and Mines Office (PTGS) on 24 March 2020. PTGS issued the renewal approval for this ML with the dates, the expiry date being 25 March 2030, and as I have informed, this was through processes implemented, there was input from the Land Office, input from all agencies
involved, and the work done that was carried out, and we need to speed up the process to complete HORAS, in fact. Because that site is the HORAS site that we need to complete, and if we delay, it will be given to Semesta. Semesta does not have machinery, they will appoint other contractors and possibly appoint KL Larut. So, that is part of the justifications considered by LUAS and so on, and we considered it in the State Executive Council Meeting.
Mr Speaker, just one.
Satu lagi.silakan
Just one. I request clarification from Dato' Menteri Besar, perhaps an answer need not be given now and may be provided in writing. Since special consideration was given to KL Larut, this House wishes to ask Dato' Menteri Besar. Can Dato' Menteri Besar provide the quantity of tin that has been extracted during the period of approval given to KL Larut, and also the quantity of sand extracted from the extension period granted under that special consideration, and how much royalty has been paid by KL Larut to the State Government for tin mining and also for sand mining at the site of 1,000 acres in Bestari Jaya? Thank you.
Thank you. If I may inform you now about the royalty, since there is preparation for it, approximately 3,126 820.75 total tin. With the sand, there is nothing for the time being. Later I will submit it, because this brain is not a computer and cannot remember everything. Thank you. I also appreciate that you asked for a written answer.
Thank you, Dato' Menteri Besar. I invite the Honourable Sijangkang.
Thank you, Mr Speaker. Question number 94.
Oral Questions — Government-Aided Religious Schools (SABK)Questions
94. To ask the Y.A.B. Dato' Menteri Besar:-
a)
Most of the existing State-Aided Religious School (SABK) buildings and infrastructure are increasingly dilapidated. Does the State Government have plans to upgrade or build additional buildings at the existing schools?
b)
Based on the increase in the number of student applications for SABK, what are the solutions for applications that fail to gain admission to SABK?
Thank you, Honourable Sijangkang, for the question raised. For part (a), most SABK buildings are more than 50 years old and certainly require attention so that they can be used safely. The State Government has channelled assistance for repair and upgrading works on dilapidated and damaged infrastructure according to current needs, with priority given to infrastructure that could endanger the users of the premises.
For the information of Honourable Sijangkang as well, the State Government has proposed an allocation of RM4 million for 2024, to be used for the repair of religious schools in every district in the state of Selangor. At the same time, the Selangor Islamic Religious Department (JAIS) is also managing repair works using allocations obtained from the Ministry of Education Malaysia and the Department of Islamic Development Malaysia (JAKEM).
For part (b), there are 3 main solutions to applications that fail to gain admission to SABK:
i. Maximising the number of students in classes through staged intake of students; ii. A proposal to build additional hostel buildings at selected schools, such as at Sekolah Agama Menengah Pasir Panjang, to accommodate excess applications in the Klang Valley; and iii. Students may follow learning at KAFA Menengah classes (KKM) across the State of Selangor. These classes are conducted 3 days a week before or after students study at SMK Aliran Perdana.
Candidates who were unsuccessful and are interested may continue their learning at KAFA Menengah (KKM) classes across the state of Selangor. These classes are conducted 3 days a week before or after students study at SMK Aliran Perdana. Thank you.
Soalan tambahan.
Silakan.
Thank you. As mentioned by the Honourable EXCO, some of these schools are already more than 50 years old. I take as an example my own area, Sekolah Agama Menengah Tinggi Tengku Ampuan Rahimah, which is of that age. Some of its buildings have caught fire due to the wiring system, some of its buildings have had their roofs blown off due to age and storms, and some have also collapsed due to termite damage. Will the State Government plan to start comprehensive development of these old school compounds and develop them strategically, following a master plan one by one? Because if it is 50 years old, I think a large part of the building is already in a terrible state, so if we start from now, perhaps we should develop one school with a large master plan, because the needs may be quite different from when it was built before. Today, with the proliferation and diversity, it needs to be developed. What is the Honourable EXCO's opinion? Thank you.
Thank you, Honourable Sijangkang. The planning, monitoring and management of these old general schools is carried out under JAIS, with priorities given based on criteria set by JAIS itself. I think the planning exists and will be implemented by JAIS.
Thank you, Seri Setia. Now I invite the Honourable Sentosa.
Thank you, Honourable Mr Speaker. My question is number 95.
Oral Questions — Hijrah ProgrammeQuestions
95. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What was the total assistance to Hijrah entrepreneurs throughout 2023?
b)
Does the State Government intend to strengthen the entrepreneur assistance programme in 2024 so that it is more effective?
Thank you, Mr Speaker. Thank you, Honourable Sentosa. Up until September 2023, the number of Hijrah entrepreneurs who have received assistance is 2,860 persons, with a total financing amount of RM30,590,000. The Selangor State Government, through the Standing Committee on Entrepreneurship, has planned to strengthen the Entrepreneur Assistance Programme in 2024. For this purpose, the establishment of the Selangor Micro, Small and Medium Entrepreneur Development Council, or MARSHAL, with permission, was approved in the 16th Selangor State Government Executive Council Meeting dated 16 and 17 June 2023, with the aim of coordinating entrepreneurship programmes, planning systematic and comprehensive entrepreneur development, and thereby producing resilient and viable entrepreneurs. The entrepreneurship programmes in the State of Selangor will also be coordinated with all the State Standing Committee Chairmen for the purposes of coordination and cross-pollination of ideas. Thank you.
Soalan tambahan?
Not a supplementary question.
Next question.
Y.B. TUAN MUHAMMAD HILMAN BIN IDHAM
: Supplementary question.
Sila.
Thank you, Speaker. Thank you, Honourable Member, for the answer just now. I have a supplementary question regarding this Hijrah Entrepreneur Programme. Many young people have succeeded as a result of the Hijrah Programme, and this programme provides assistance to our small entrepreneurs. But what KPI will the Government possibly set? Because if the government helps with financing of RM10 thousand but they have already achieved profits of perhaps RM300-400 thousand, perhaps they should need a larger financing amount. So what is the government's proposal, perhaps to set one KPI so that we can upgrade, upgrade the level of these small entrepreneurs with larger financing assistance, and insyaAllah they will be more successful in the future. Thank you.
Thank you, Honourable Gombak Setia. The State Government does have a specific plan, as Honourable Pandan Indah informed us just now. If at the Agropreneur level we assist and support them further, we have follow-up. What we mean is we do not just give fund assistance and leave them. For example, for entrepreneurs who receive Hijrah Funds, those who have reached a good level of achievement, for example with high income or sales proceeds, and who intend to expand their business further, we will help or make it easier for them in terms of financing. Where at government level there is none, but for example these entrepreneurs want to ask for a loan from a bank, commercial banks may be higher. So at the Hijrah level we provide what is called a certification or facilitate their process, and at the same time we will also help further expand their enterprise in terms of marketing and promotion. For example, we bring them to be exposed at international expos, such as in Canada, and next year insyaAllah we will bring our successful Hijrah entrepreneurs to be exposed to the Middle East market, for example. And at the same time, we also make use of programmes such as the Selangor International Business Summit, where we use this platform to help these entrepreneurs promote their products and also the results of their efforts. Those are among the State Government's steps to upgrade the Hijrah-financed entrepreneurs, where they have reached a level that is commendable, and we want to help them increase their company's sales further. Thank you.
One more supplementary question. Bukit Melawati...
Okay, since this Hijrah is largely given to young people, my question is: what action will the State Government take if some of these young people do not repay this Hijrah loan? What action has been taken by the State Government, perhaps blacklisting even for amounts of RM5 thousand or perhaps RM10 thousand? What is the government's action towards borrowers, most of whom are in the youth group?
Thank you, Honourable Bukit Melawati. We do have a specific policy towards borrowers who are late or fail to settle their loans. But at the same time, the State Government takes a rather flexible stance and attitude, meaning we do not immediately punish or blacklist them or CTOS them, but we adopt an approach to understand what their problems or needs are. For example, after the transition from this pandemic, many borrowers, especially from the young generation involved in start-ups, experienced difficulties. Because they had just borrowed, and suddenly there was a pandemic. It had implications for their businesses, and we gave them leniency or a fairly flexible period to settle the loan. But if there are those who, after we have given that leniency, remain obstinate, we will consider taking follow-up action, including also blacklisting them from borrowing in the future. Thank you.
Supplementary question, Speaker.
One more, yes, last one.
Just a little, just a little.
Okay, okay.
Thank you, Mr Speaker, and thank you, EXCO. There is one case, not one case, a group of cases involving Hijrah Loans and Local Authority (PBT) Licences. Where at the time of application, it was not, did not know. Perhaps it was not checked whether the licence had been obtained or not by the borrower, or whether they were borrowing, given a licence but in breach. The issue is when the PBT carries out an operation to close stalls, seize stalls, even though they are Hijrah borrowers. So is there no synchronisation with permission, togetherness in providing loans with Local Authority Licences? Thank you.
Alright, thank you, Sungai Ramal. There is indeed a specific policy at the PBT level. What I mean is, they are different matters: Hijrah Loans, Hijrah Financing, and the policy for opening businesses at the PBT level. These are different processes. However, if there are Hijrah borrowers, for example, who face difficulties or hardship in obtaining a licence from the PBT, they can contact the Council directly, or they can appeal to the State Government so that we can help coordinate their application. But usually those who borrow from Hijrah encounter this problem less, because they understand the procedure. And I think in the State of Selangor, the licence application process for businesses at the PBT level is fairly easy, and perhaps at the EXCO level it can also be improved in terms of making it even easier, especially for Hijrah borrowers. So I think, if there are matters in the Honourable Member's area, for example, the Honourable Member may raise them with me so that we can facilitate and ease their process. Thank you, Honourable Member.
Thank you, Kota Anggerik. Subang Jaya stood up just now...
Yes. Because Mr Speaker, I wish to take the Kuala Kubu Baharu question under Standing Order 24 (2).
Oral Questions — Selgate Rawang HospitalQuestions
96. To ask the Y.A.B. Dato' Menteri Besar:-
a)
The latest status of Selgate Hospital Rawang, including the construction cost after the change of developer.
b)
State the reasons for the delay in completing the construction of Selgate Hospital Rawang.
Thank you. Honourable Subang Jaya. The percentage of construction progress of Selgate Hospital Rawang so far, the latest progress, is 47.9%. The construction cost for Phase 1 for 95 beds is RM83 million, and the combined construction cost, because at this stage Selgate has proposed to build Phase 1 together with Phase 2, for 230 beds, is RM148.5 million. With the increase in the number of beds, in the new construction cost there is a reduction, a reduction of 26% per bed.
For your information, Selgate Hospital Rawang was scheduled for completion in February 2022 under the former contractor, Hati Muda Sdn. Bhd. However, extensions of time (EOT) were granted 6 times before a new contractor, Cypark Resources, was appointed to complete the construction of the project. Now, the construction of Selgate Hospital Rawang is expected to be completed in June 2024. Among the reasons for the delay in completing the construction of Selgate Hospital Rawang are that the former contractor faced cash flow problems and a shortage of manpower. Second, especially during the Covid-19 pandemic, which caused delays in the construction of the hospital, and finally, additional regulatory compliance in this project resulted in an extension of the construction schedule due to the latest requirement issued by the Fire and Rescue Department (Bomba), namely a fire escape backlift for compliance with the UBBL 1984 UU-Care Hospital. Additional works also had to be carried out to enlarge the refuge area and add lifts.
Supplementary? Yes, Rawang.
Yes, thank you, Honourable EXCO. I have two questions. The first is whether the work process is on schedule? The second, when did the Honourable EXCO just say the project would be completed by mid-2024? When can the hospital begin operations?
Thank you, Honourable Rawang. As previously stated, it was indeed delayed because of the former contractor, and the former contractor was replaced around 2022, on 19 October 2022. So far, according to the new contractor, it is indeed on schedule, and the construction may be completed in June 2024, but the operating period may start a little later, perhaps within 6 months. Perhaps at the end of 2024 or the beginning of 2025. That depends, because they need approval from the relevant parties. So it may need a little more time. Thank you.
Mr Speaker, supplementary question. Bandar Baru Klang. Bandar Baru Klang would like to ask whether Selgate Hospital Rawang is a hospital owned by the State of Selangor. Second, if so, how many hospitals are under the State Government of Selangor?
Thank you, Honourable Bandar Baru Klang. So Selgate Hospital Rawang is actually owned by a GLC. It has no direct connection with the Selangor State Government. However, I have discussed with Selgate that, if this hospital begins operations, it may be given certain privileges or specific discounts for Selangor residents, because Selgate is a GLC. But that matter is only at the start of discussions and has not yet been decided. Under Selgate, besides Rawang Hospital, there are also others under construction, including Selgate Hospital Sepang, Selgate Setia Alam, Selgate Hospital Ulu Tiram in Johor Bahru and Selgate Hospital Mont Kiara. So all of these are under construction and not yet fully completed. So for detailed information later, you may obtain it from me. Thank you.
Yes, Seri Serdang?
Mr Speaker, my question is No. 97.
Oral Questions — Gazettement of Places of WorshipQuestions
97. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What are the government's efforts to facilitate the gazettement of places of worship?
Thank you, Mr Speaker, thank you, Honourable Seri Serdang, who is concerned about the gazettement of places of worship. For (a), as with the gazettement process for any land, the gazettement of land for places of worship for non-Islamic religions and traditions is also subject to Section 62 of the Kanun Tanah Negara (KTN 1965). To facilitate the gazettement process, a clearer guide and reference has been issued by the Selangor Director of Land and Mines Office (PTGS), namely the Director of Land and Mines Circular (PTGS) Number 8 of 2011, concerning the guidelines on the use of land for the purpose of non-Islamic places of worship in the State of Selangor. These guidelines cover more specific conditions and criteria for the gazettement process. The District and Land Office (PDT) will then act as the agency managing gazettement applications received from associations. This agency will ensure that such applications are submitted to the state authority together with complete and orderly supporting documents, including plans and relevant information. In addition, the Selangor State Special Committee on Buddhism, Christianity, Hinduism, Sikhism and Taoism (LIMAS) also acts as a facilitator for gazettement applications for places of worship. LIMAS Special Committee meetings will discuss every application for gazettement of places of worship, involving the relevant technical agencies including the District and Land Office (PDT), to ensure that every gazettement application can be considered as well as possible and meets all the criteria set before the gazettement process can be completed. All these processes are an effort by the State Government to facilitate the gazettement process for places of worship. This also ensures that the gazettement of these places of worship does not bring negative implications arising from gazettement that disregards technical aspects and development plans. This situation would ultimately place the places of worship associations in a difficult position in the future. That is all, thank you.
Mr Speaker, supplementary question.
Silakan Sentosa.
I thank the Honourable EXCO for the answer provided. I want to ask about the timeline for each application. Does the State Government have a set period to help these places of worship applications be resolved? Thank you.
Thank you, Mr Speaker, and thank you, Honourable Sentosa. The supplementary question concerns a period and timeframe for the gazetting process. It usually takes 6 months to 1 year. However, because technical issues and so on sometimes occur at the district office level and at the level of the submitting association, they lack documents, checklists and so on. This has caused delays, and eventually it reaches the Racey Committee and then LIMAS, and the LIMAS Special Committee meeting, which is not every month; it needs some time, 3 months and so on. So it is possible that this has delayed it beyond the expected 6 months to 1 year. Nevertheless, the government will carefully ensure that we speed up and simplify the process so that it does not take too long.
Seri Serdang?
Supplementary question. Thank you, Honourable EXCO. My request is that the State Government give greater attention to our efforts to gazette places of worship that can be settled quickly. Those that have been completed with KTN and so on. Because in my constituency of Seri Serdang there are places of worship more than 20 years old, but the gazetting of places of worship within the Seri Serdang State Constituency is still not completed. So I request, because we do not want future effects such as land disputes and so on, that you give special attention to quickly resolving the issue of gazetting non-Muslim places of worship.
Thank you, Honourable Seri Serdang, who requested that priority be given to applicants whose documents are already complete and so on. This will be considered. We will endeavour to ensure that any that are nearly ready and complete, with no related issues, are expedited. This is the most important point, because the State Government has taken note and has taken proactive steps since 2008 to reorganise all these non-Islamic places of worship. We do not want them built haphazardly here and there without control. This is a very comprehensive system, a forward-looking system that can ensure non-Islamic places of worship are managed properly. Now we know which have been gazetted and which have not. Previously, even gazetting had not been done; nobody knew where they were, whether the land was halal or not, whether it was legally valid or not. That was the situation before. But now we have simplified everything into one system. So previously, MAS had no system; now there is a system. With permission, Mr Speaker, I hope that with this gazetting method we can help manage the administration of these places of worship in a more orderly and systematic way. That is all, thank you.
Selat Klang?
Thank you, Mr Speaker. My question is number 98.
Oral Questions — Strata Title Status at Flat Sri PerantauQuestions
98. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the status of the strata title application for the Sri Perantau flats in the Selat Klang State Constituency?
Thank you, Selat Klang. Thank you, Speaker. The question from Selat Klang is directed at the strata title application for the Seri Perantau flats in the Selat Klang State Constituency. I inform the House that for title BN 122996, Lot 24885, Section 21 Phase 1, the town and district is the town of Port Swettenham, District of Klang. The date of receipt of the application was 2 February 2023. The application for subdivision of the building was approved by the Land and Mines Office (PTG) on 8 August 2023. The Building Acknowledgement Plan was approved for issue by the Director of the Department of Survey and Mapping on 13 September 2023 and received on 18 September 2023. It is ready to be printed and is in the process of registering a new title at the Strata Title Application Division of the Selangor Land and Mines Office. That means it is complete; it only needs to be handed over. I think some of it has also been handed over since last September. For Lot BN 122997, Lot 24884 Section 21 Phase 2, the date of receipt of the application was 9 December 2022. The subdivision of the building section was carried out by the Deputy Director of PTG on 28 August, and the Building Acknowledgement Plan was approved for issue by the Survey Department on 4 October 2023 and received on 10 October. It is ready to be printed and is in the process of registering a new title at the Title Application Division. So these are two lots, or two that we have approved, Honourable Member. One was completed in October 2023, and the other on 18 September 2023. Thank you.
Thank you, Honourable Member.
Yes, Selat Klang?
I have one or two questions that I want to put to the Honourable Member. Firstly, regarding the operation of the lifts in all 12 blocks in this area, which often break down, and we are not sure whether they are still under the responsibility of PKNS or have been handed over to the council. Thank you.
I have to check: once the title process is complete, by convention it will be managed by the residents. But I fully understand about the apartments and flats. I have also been to your open event, Honourable Member, behind those flats, and we know about the very poor condition of the flats, which may also require support. Therefore, perhaps we can look at Tabung Ceria and other such funds, or other allocations that can be generated by the Ministry of Housing and Local Government, to improve them. The basic point is how we prepare the residents once the strata title is complete, that is to say, the houses and the entire building become their property. Are they ready to manage it themselves according to the concept, or according to other strata management methods with a JMB, Joint Management Body and so on? This is something I feel needs to be transitioned gradually. Even if PKNS bears it, I feel PKNS will not be able to continue the social programmes that were built previously. Thank you.
Honourable Members, the time is now 11.30 a.m. I hereby adjourn the question session for the next business.
Continuation of Supply Bill 2024, All StagesBill
The next Order of the Meeting. Continuation of the Rang Undang-Undang Perbekalan 2024, all stages.
Honourable Members, the House sits as the Committee of Supply.
Schedule B30, Selangor Syariah Prosecution Department, RM2,863,000.00.
Yes, Honourable Sijangkang, please proceed.
Thank you, Mr Chairman. I take Item 50500, Object Code 11000. As we know, I think this department is one of the new departments. But the management of prosecution has been running for a long time, and I think they also have the capability to manage the prosecution of related cases. However, I also received information that although preparing the charge papers does take time, is this due to the process of completing the prosecution papers, or does it also involve the number of staff available, such that the preparation of these charge papers takes such a long time? If we look at it, even from the new policy perspective, I am not sure whether the new policy is related to staffing. It appears to be decreasing from 163,000 to 128,000. Next, I also want to ask about Object Code 27000, Supplies and other materials. If we look, there is no difference in terms of allocation under the existing policy, but under the new policy there is RM15,000.00 which did not exist before. I hope the Government can explain for what purpose these supplies and other materials are actually intended. I think likewise, under Object Codes 34000 and also 35000 Vehicles and Machinery, I think perhaps there were purchases of new vehicles or something last year, but this year there are none. However, regarding 35000, a one-off RM20,000.00 last year is estimated at RM21,300.00 this year. I may need an explanation. Thank you.
Sungai Panjang.
Sungai Panjang.
Item 505000 Administration and Finance, Object Code 1100. If we look at 2023 and 2024, there is an increase. The question is, what is the total increase in new officers? Because it was previously proposed that human resource staffing be increased, because the Syariah High Court has only four (4) officers and there are 12 Syariah Court Halls. So it is proposed that new officers be added. On the same page and the same item, under Code 29000, which concerns Professional and Other Services: how far has the Draft Proposed Selangor Syariah Enactment 1995 progressed, and at the same time also the Draft Amendment to the Selangor Syariah Criminal Procedure Enactment 2003, Section 78 of the Islamic Administration Enactment? Thank you.
Ya, Sabak.
Thank you, Mr Chairman. I refer to Programme Item 505000, Object Code 11000, Salaries and Wages. I am not sure whether the sum of RM1.6 million will involve an increase in officers to conduct monitoring of the many violations of the Enactments or of Syariah that require prosecution. Statements that require monitoring. Perhaps we need to add officers to look into this matter. For example, healthy teachings, for example, or statements that are too, teachings that deviate, statements of liberalism, for example. One statement by a woman, as we know, who said that in her home she is the Imam to her husband and family. So this is clearly contrary, but I do not know whether prosecution is taken, or whether we wait and see, or whether we lack officers. So, if it involves a shortage of officers, then we hope that, if not included, additional allocation is needed to appoint officers to streamline and look into the many more statements that deviate from the Islamic Syariah itself. Wallahualam.
Yes, I ask for an explanation from Seri Setia.
Thank you, Speaker. On the matter concerning Salaries and Wages, 505/11000, I have been informed that there will be no increase in staff in this department. But what will happen is a slight internal restructuring that will be carried out to further enhance the existing capacity of the department. I would like to include the answer for Honourable Sungai Panjang, referring to 505000 for the overall Supply Services: there is no increase in terms of existing assets. For example, departmental vehicles and so on, because we will continue to use existing assets and there is no need to add special allocations for the officers in those departments. As for the question from Honourable Sungai Panjang regarding the preparation of draft Enactments and other draft legislation, these matters are being reviewed through the Selangor Islamic Religious Council. Thank you.
Schedule B30, namely the sum of RM2,863,000.00 for Head B30, Selangor Syariah Prosecution Department, shall form part of the Schedule. Honourable Members who agree, please say yes. (Members of the House said yes). Honourable Members who do not agree, please say no.
Agreed.
Total Supply RM2,467,626,700.00.
The Total Supply of RM2,467,626,700.00 shall form part of the Schedule. Honourable Members who agree, please say yes. (Members of the House said yes). Honourable Members who do not agree, please say no.
Agreed.
Clause 1 and Clause 2.
Clause 1 and Clause 2 shall form part of the Bill. Honourable Members who agree, please say yes. (Members of the House said yes). Honourable Members who do not agree, please say no.
Agreed.
Jadual.
The Schedule shall form part of the Bill. Honourable Members who agree, please say yes. (Members of the House said yes). Honourable Members who do not agree, please say no.
Agreed.
Nothing, that was too fast. I thought someone would debate. Second time, third time, right. Patience, patience. Patience is half of faith. Mr Chairman, I respectfully propose that this Bill be reported to the House now.
Mr Chairman, I second the motion.
The House resumed its sitting.
Mr Speaker, I would like to inform the House that this Bill has been considered in the Committee of Supply and has been agreed to without any amendments. Therefore, I propose that this Bill be read a third time and passed now.
Mr Speaker, I second the motion.
Honourable Members, the motion before the House is that this Bill be read a third time and passed now. Honourable Members who agree, please say yes. (Members of the House said yes). Honourable Members who do not agree, please say no.
Agreed.
Royal Allowances Amendment Bill 2023Bill
Third reading. This Bill may be named the Supply Enactment 2024. The next Order of Business is the Royal Allowances (Amendment) Bill 2023. This Bill is entitled An Enactment to amend the Royal Allowances Enactment 1959.
Mr Speaker and Honourable Members. The Royal Allowances (Amendment) Enactment 2023 needs to be amended under the Allocations for Class Three (3) and Class Four (4). For Class Three, the allocation has increased from RM7,205,497.00 to RM7,651,788.00, an increase of RM446,291.00. This increase is due to the calculation and readjustment of the emoluments of staff at the Palace Office. For Class Four (4), the allocation has increased from RM16,433,733.00 to
RM17,011,542.00, an increase of RM577,809.00. This increase is needed for the replacement of equipment and the increase in emoluments of the Palace Office's contract staff for the year 2024. Mr Speaker and Honourable Members, with the explanation given, I hereby propose that a Bill entitled the Royal Allowances (Amendment) Enactment 2023 be read a second time.
Mr Speaker, I second the motion.
Honourable Members, this motion has already been seconded. I put this Bill forward for debate. Honourable Hulu Kelang, please proceed.
Mr Speaker, I thank you for the opportunity to represent the Members of the Perikatan Nasional State Assembly in debating the Royal Provisions Bill, which the Honourable Dato' Menteri Besar has just tabled. As I stressed in the debate at the policy stage, Perikatan Nasional will defend the dignity of the Malay Rulers' institution in this country, and I have stated that the Malay Rulers' institution is the anchor of stability and prosperity, and like an anchor, it keeps the ship of the nation from being swept away by typhoons and storms. The Honourable Dato' Menteri Besar has tabled a number of additional allocations to meet the needs for emoluments as well as the replacement of certain facilities and equipment. However, what I wish to stress here is a re-examination of the role of Duli Yang Maha Mulia Tuanku Sultan Selangor, which is increasingly challenging, as he must shoulder a very heavy responsibility, particularly as the Head of State in the State of Selangor Darul Ehsan. The State of Selangor is an advanced state, and to continue moving forward, the role and royal counsel of Duli Yang Maha Mulia Tuanku Sultan must certainly be given serious attention by the State Government so that this state can continue to be developed and guarantee stability and prosperity for all the people in the State of Selangor.
In addition to the role of Duli Yang Maha Mulia Tuanku Sultan within the state, we are also aware that Duli Yang Maha Mulia Tuanku Sultan Selangor has been appointed Chairman of MKI, to ensure that the sovereignty and propagation of Islam in this state and in this country can truly proceed well and in full harmony, because once again, Malaysia is a diverse nation consisting of many races, religions and cultures, and once again the role and royal counsel of Tuanku Sultan as Chairman of MKI is very important in guaranteeing prosperity at the national level and in this state.
Therefore, in order to meet the very great responsibilities at the state level and also at the national level, I, on behalf of Perikatan Nasional, propose
that additional posts and appointments of officers be provided to work together with the Palace so that the role and responsibilities borne by Duli Yang Maha Mulia Tuanku Sultan can proceed well and smoothly and can meet the needs of the duties that have been undertaken by Duli Yang Maha Mulia Tuanku Sultan Selangor.
I hope that while the Honourable Dato' Menteri Besar's presentation has outlined several additional allocations, I nevertheless think it would be proper and highly appropriate for the State Government to provide certain posts, whether researchers, media officers or liaison officers, who can assist the duties of Duli Yang Maha Mulia Tuanku not only as Head of State in the State of Selangor Darul Ehsan but also as Chairman of MKI, which certainly is very heavy in the current political climate of the country.
We saw just a few days ago that the Selangor Islamic Religious Council issued a firm statement urging the Government to be more cautious about subtle movements to belittle Syariah Law in this country and also in the states within Malaysia. Certainly, the State of Selangor is not exempt. I believe the Honourable Dato' Menteri Besar also agrees, as does the Honourable EXCO for Religious Affairs, that Syariah Law must continue to be upheld and must never be belittled by any party, because that will challenge stability, prosperity and harmony in a plural society in this country. Thus, once again, the role of Duli Yang Maha Mulia Tuanku Sultan Selangor is very important. Therefore, the support and backing of the State Assembly Members and also the people of the State of Selangor Darul Ehsan, who are the subjects under Tuanku's patronage, are very important for us to unite and continue to unite so that we can together see a prosperous and advanced state.
I wish to propose to the Honourable Dato' Menteri Besar that while we can and will pass this Royal Provisions Bill, I also propose that additional allocations be provided from time to time to meet the needs for carrying out the very great duties and responsibilities for the beloved State of Selangor. Mr Chairman, I support the Royal Provisions proposed by the Honourable Dato' Menteri Besar, thank you.
Does the Government wish to give any comments or a winding-up?
Thank you Mr Chairman, thank you to the Opposition for its support of the Supplementary Supply for the Royal Enactment. This is certainly what the State Government's measures have shown: to ensure that the dignity of this institution can be preserved, not only with slogans and words but with actions and sufficient supplies to
ensure that this institution continues to be strong, whether through all the facilities and needs of Duli Yang Maha Mulia Sultan, the Royal Council members, and the royal institution itself in the State of Selangor being safeguarded, because in our state, as is well known, and in our national system, we practise a constitutional monarchy. The term constitutional monarch means that the King cannot be wrong, because he is protected and safeguarded by the constitution and the federal constitution. Therefore I believe that by meeting these needs, we can guarantee the stability, prosperity and harmony of our nation, and especially the State of Selangor, in facing the challenges mentioned earlier.
One of the challenges raised is the very free and open communication and media in the structure of social life today. Even today, Duli Yang Maha Mulia Tuanku has his own institutions or social media communication tools, which we did not see in the past 5 or 7 years. So these additional allocations are, in a sense, to meet those needs so that some issues raised, sometimes those that revile, insult and even question the power of Duli Yang Maha Mulia Tuanku, especially when they are not favourable to any party. I am not mentioning any party; sometimes there is a tendency, yes. So this is our responsibility as a responsible leadership to preserve this leadership, including educating the coming generations, not to be fanatical about groups but to understand the structure and also the constitution and the federal constitution of the nation thoroughly. Thank you, that is my brief winding-up.
Honourable Members, the motion before the House is that this Bill be read a second time now. Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
The second reading of this Bill, entitled an Enactment to amend the Royal Provisions Enactment 1959.
Mr Chairman, I respectfully move that this House resolve itself into a Committee to consider this Bill clause by clause.
Mr Chairman, I support.
The House resolved itself into a Committee.
Fasal 1.
Clause 1 stands part of the Bill. Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Fasal 2.
Clause 2 stands part of the Bill. Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Mr Speaker, I inform the House that this Bill has been considered in the Committee and has been agreed to. Therefore I propose that this Bill be read a third time and passed now. Left behind, left behind. Mr Chairman, I respectfully propose that this Bill, as has been discussed, be agreed to and be reported to the House now.
Mr Speaker, I support.
The House resumed.
Mr Speaker, I respectfully inform the House that this Bill has been considered in the Committee and has been agreed to. Therefore I propose that this Bill be read a third time and passed now.
Mr Speaker, I support.
Honourable Members, the motion before the House is that this Bill be read a third time and passed now. Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Supplementary Supply Bill 2023 (All Stages)Bill
Third reading. This Bill may be cited as the Royal Provisions (Amendment) Enactment 2023. The next item of business is the Supplementary Supply Bill 2023, all stages. This Bill is an Enactment to authorise the use of a sum of money from the State Consolidated Fund for additional expenditure for
Services for the Year 2023 and to appropriate that sum for the specific purposes for that year.
Ya, pencadang.
Mr Speaker and Honourable Members, the purpose of this Bill is to provide statutory authority for certain additional payments made for state services in 2023 that were not provided for by existing law. Through the Supply Enactment 2023, which was read in 2022 and passed on 28 October 2022, a sum of RM2,384,327.980 was allocated for the State Services Allocation for 2023. Based on the current finances, there is a shortfall of allocation for certain departments. Accordingly, the first Supplementary Supply Enactment of RM125 million is required to cover that shortfall, and the additional allocations required are as follows. B29 State Treasury of Selangor RM125 million. The additional allocation, meaning Supply B29, State Treasury, totalling RM125 million, is required as follows: RM5 million is needed to cover the expenditure for the advance payment of cash in lieu of leave of civil servants. RM13 million is allocated to cover the expenditure for the Special Additional Annual Salary Increment (KGT) 2023 of RM100 to all civil servants in Grades 11 and 56.
And RM82,438,120.56 is required to cover the insufficient additional departmental allocations expected in December 2023. RM12 million is required to cover the re-contribution to the Affordable Housing Trust Fund (Tabung Amanah Rumah Mampu Milik) to meet commitments in 2023, and RM5,661,879.44 is required to cover the re-contribution to the Contingency Fund (Kumpulan Wang Belanja Mengejut), and RM6 million is required to cover the top-up of the Contingency Fund (Kumpulan Wang Belanja Mengejut).
With the explanation given, thank you Honourable Member, I propose.
Mr Speaker, I support.
Honourable Members, this motion has already been seconded. I now put this Bill forward for debate. Yes, Hulu Kelang.
Thank you Mr Speaker. Thank you to the Honourable Dato' Menteri Besar who tabled the application for Additional Allocation for additional payments, for matters not provided for in the Budget 2023.
Honourable Dato' Menteri Besar, allow me to repeat my stance in the policy-stage debate last week. To give a positive reprimand to the State Government not to make these additional expenditures a common practice in financial management. Earlier, the Honourable Dato' Menteri Besar stated that in the Supplementary Supply 2023 tabled in 2022, the Honourable Dato' Menteri Besar proposed a sum of RM2.38 billion for expenditure for the year 2023.
Unfortunately today the Honourable Dato' Menteri Besar has reappeared in this House to apply for additional allocations for matters that were not provided for. This is the basis of our earlier discussion because in my view the allocations tabled in any annual budget must be planned well and responsibly. The fiscal expenditure of a State Government must certainly be planned and prepared responsibly so that there is no tabling of additional budgets, and I have stressed in our earlier discussion that this additional budget can only be considered in certain situations such as disasters, calamities, pandemics or emergencies, matters beyond our expectations, but not for expenditures that can be allocated or budgeted in advance. In the presentation of the Honourable Dato' Menteri Besar earlier, the matters requiring additional expenditure or additional payments are, in my view, matters that can be planned, because most of them are emoluments or special payments whose figures the Honourable Dato' Menteri Besar and the State Government certainly know, namely the number of posts existing in a department. The number of posts that exist in a department and agency of government, and also the Government's plans to pay cash payments such as the annual salary increment or cash in lieu of leave of civil servants. These matters are not unexpected, they are not pandemics, not emergencies, but matters that already have data and statistics in the State Government that can be planned earlier. Certainly the State Government every year wishes to recognise the role and also the sacrifice and service of civil servants, and we usually give a little appreciation to them whether in the form of BKK, or annual salary increments or other cash payments as an appreciation of their service in the State Government today. But unfortunately this sum of RM125 million was overlooked by the State Government in the Budget 2023. That is why in my debate last week, although the Honourable Dato' Menteri Besar tabled the Budget 2023 allocation of RM2.38 billion, with the additional expenditure today of RM125 million, the total 2023 budget soars to RM2.66 billion. This also proves that the Budget 2023 is actually higher and bigger than the Budget 2024. This is what I repeat once again, I repeat that the Budget 2024 is not
as large as it might be; I do not dispute that figure, but I think that in the current sluggish and dire economic situation, expenditure must be planned more carefully and responsibly, and a sum of allocations suited to current needs for the people of the State of Selangor must be allocated, and I reminded in last week's debate that the State Government should give an assurance that the RM2.53 billion proposed for 2024, which we have just passed, will not be followed by any further allocation or additional budget next year. Mr Speaker, this matter is a discipline in fiscal expenditure in the tabling of budgets, whether state or national, and these matters must be considered from the beginning, and I believe we have officers, public service members, including the State Financial Officer, who can give advice to the State Government on the needs of the relevant departments and agencies.
One matter that caught my attention in the additional payments is the third item, the insufficient additional departmental allocations until December 2023. This again proves that the planning and fiscal expenditure for the department concerned was not done carefully, to the extent that it had to apply for insufficient additional allocations until December 2023. Honourable Dato' Menteri Besar, I hope the Honourable Member can receive this view with an open heart, because the State of Selangor must uphold its record and excellence in prudent and responsible financial management, because we bear a very great responsibility, and we wish to maintain Selangor as the largest contributing state to the national GDP (KDNK) in the times to come. I once again wish to stress that we will scrutinise in our debate this morning the application for additional payment of RM125 million, but at the same time we also wish to give advice and views so that this does not become a practice in the future. I believe we can, we have a body of professional staff, officers and civil servants who can give good advice and views, only we hope the State Government can listen, is ready to listen, and adhere to the views and advice of the officers so that our management is more efficient and responsible. Mr Speaker, that is my view this morning, we will follow the views of the other State Assembly Members for the consideration of the State Government. Thank you Mr Speaker.
Yes, Batu Tiga.
Mr Speaker, I was interested in the debate given by the Leader of the Opposition. However, I wish to mention a little of the record where the government today, perhaps in 2023, did not spend more, but in fact took money that was not collected. In the
statement on expenditure tabled by the Honourable Dato' Menteri Besar, it mentions adopting effective and prudent expenditure approaches and strategies. The financial performance of the State Government up to 9 November has recorded a financial surplus of RM427.25 million. Specifically, revenue collection up to 9 November has been recorded at a total of RM2.405 billion and 85.97% has been used. Meaning, I consider that the government today, that today it is tabling this supplementary supply, is not using additional allocations or drawing from any sources, but is using the financial surplus recorded by the government. Thank you.
Sijangkang.
Thank you, Mr Speaker. I have listened carefully to what was said by the Most Honourable Dato' Menteri Besar regarding the Supplementary Appropriation Bill amounting to RM125 million. I believe the issue is not where the financial source comes from. I see it as relating to good governance, from the perspective of sound financial management discipline within the State of Selangor itself. This is because I see that there is nothing that requires urgent needs if it had been well planned. Perhaps if we were facing Covid-19 it would be different, or if a disaster had occurred, it would be different. But this relates to allocations concerning emoluments and the inadequacy of departments, and these are several plans which can certainly be arranged in terms of financial discipline within our budget for 2023. However, I think that even if I give my support to this supplementary budget Bill, I would not feel comfortable if I did not obtain some details from the government, especially regarding the inadequacy of the department mentioned earlier, RM8.7 million. What exactly are the activities that cause these departments not to have sufficient funds? Likewise, regarding the Affordable Housing Trust Fund, how strong was this fund previously? What allocations or activities did we start for this fund, to the extent that our fund is now inadequate for us to spend this year? Then, regarding the Emergency Expenditure Fund? I also hope there will be details from the government on how the emergency expenditure mentioned here is, and whether this is also among the matters anticipated in the budget or estimates prepared. So in principle, I see that what was debated by the Leader of the Opposition is a good discipline that should become our practice in managing a progressive government in our country, Malaysia. Thank you.
Honourable Members all, I now invite the government side, if it wishes to wind up or give any explanation on the matters that have been raised earlier.
Thank you, Speaker, and thank you to the Honourable Members who have debated the additional allocation or supplementary supply that has been presented for the first time in 2023. And according to the Honourable Members, based on the track record or projections in previous years, the State Government has never made any additional allocation. For example, in 2021 we did not make any additional allocation, but in 2022 I also made an additional allocation because in that year we had to cover the costs arising from the floods that struck the State of Selangor in those years. And in 2019 I also made an additional allocation in that year amounting to RM123 thousand or RM123 million. And this year we have added a reasonable cost of about RM125 million. Honourable Member, I believe that in earlier times too, additional allocations were made due to certain factors. For in 2015, for example, we made an additional allocation of RM105.15 million, and in 2014 with a larger cost, namely RM498.06 million. I believe it is not entirely the Honourable Member's fault, because we entered as the government or administered the services in the last month, the last few months before the budget was tabled, because it was tabled earlier.
For 2020, if I may inform you, among the solutions we tried to resolve at that time was the resolution of prolonged court cases. Among them were the court case of the company SEBATI and also TTDI Land involving MSNS, which had been very lengthy, and also the company Pandan Mewah between Syarikat Pandan Mewah and PDT Gombak and PTGS. However, I have received the criticism that has been made, and I believe that in the government service sector, every year in the sixth month we indeed set a target for operating expenditure. That is at the level from as early as June, we have collected that data, and rightly we can no longer apply a formula. Previously there was seemingly a discipline called savings, cross the board we cut 5%, cross the board we cut 2%. I think that practice should be re-evaluated, because in the end, the expenditure will not be sufficient at the end, because from our track record throughout our operating expenditure, 100 or 95-97% will be used.
And when there are certain circumstances or certain situations arise, for example a situation such as a General Election, several managed expenditures and movements occur, because they involve expenditures that must be carried out by election management officers, for example at the state and district levels that will be implemented.
But I want to inform you that these needs this time are among those we have informed about. Among them is the allocation for improving the services of KGP, yes, which is said to be the granting of the special additional 2023 Annual Salary Increment (KGT) of RM100, among those in grades 11 to grade 56. The announcement regarding this allocation, or this addition, was only announced in February of this year,
2023. And we table the budget in October or November or at the latest usually December, we never did December 2022. So the announcements made by the allocations of the Federal Government sometimes add impact to the matters we carry out.
The RM82 million allocation that is said to be insufficient is the allocation involving efforts for payment of salaries of permanent or contract staff that are insufficient, overtime allowances of permanent staff. These are movement allowances, travel and living expenses of civil servants, and medical claims of civil servants. These are sometimes difficult for us to expect, because from year to year the claims differ slightly, as we are not sure what accidents there will be or what diseases will be detected. Hopefully civil servants can carry out screening after this. Screening, yes, Honourable Bandar Utama, if you could identify the civil servants so that we can estimate their expenditure.
Increases in utility bills. This also sometimes involves announcements of rises and falls by TNB and so on. Cleaning and security contracts, I think this is something that can be considered and covers the Special Appreciation Assistance amounting to RM300 for civil servants in grade 56 and below. This was announced by the Federal Government, which we have to bear and we have to allocate. So these matters are not things that can be planned or anticipated, because there are projects and there are matters beyond expectation. Forgive me. Not February. 26 January, GCR, which was announced by the Federal Government in 2023.
The departments included for the additional allocation cover cleaning contracts where the minimum wage is involved. This is the government announcement of a minimum wage of RM1,500. Before that, we did not receive any additional request or application for the minimum wage for 2023, with the allocation in 2022. That is an allocation from the Central Government which we must fulfil, and it is not that we are forced, we are responsible for implementing it. And the Emergency Expenditure Fund is intended to cover allocations that are insufficient under the Annual Departmental Operating Expenditure VOT. So not everything, Honourable Members, can we plan for certain increases, but when announcements of bonuses, for example, suddenly add RM100, increases in utility bills, illness and so on, there are fluctuations or there are fluctuate, pardon me, caused by announcements beyond our control.
However, I agree and respect the view of the Honourable Member that after this we must give the truth. What allocation is sufficient for us. And that is why, Alhamdulillah, the State Government has never forgotten to give appreciation to civil servants and the granting of BKK that we have announced based on the regulations. Only, sometimes, when
I said jokingly in that speech, do not take it too seriously, Sungai Panjang. Words of threat and so on. We never threatened. We never threatened that if you do not support the existing government, please leave in a moral manner. We never did that. Although it was done during the PN rule by some leaders. But we never did it in the State of Selangor, no matter who governed. So these are among the matters we want to do.
Thirdly, this matter may be considered. It concerns court cases. Yes, please.
Before the Most Honourable Dato' Menteri Besar turns to court cases, I can accept the government's explanation that there are matters newly announced by the Federal Government. There are three matters: the implementation of the minimum wage and also the Annual Salary Increment (KGT) announced only at the beginning of this year, and there is another announcement by the Federal Government that causes the State Government to bear additional costs. We can accept that explanation. But I believe not all of these matters are included in this RM125 million. As the Most Honourable explained a moment ago, the insufficient departmental allocation includes payment of overtime work and also the movement of officers. However, I believe these matters are usually already taken into account in the expenditure projection. They are not made through an additional budget.
On this point, I hope the Dato' Menteri Besar can work together with every department, so that they provide a more reasonable projection so that whatever budget is tabled for that year takes into account the needs for overtime or over time, and also the movement of officers, who may have to go to the field and so on to meet the relevant needs. Thank you.
Thank you. That is why I have informed this House, and I have also informed in the pre-budget presentation, that the culture of cutting 2% to 5%, which has made a major contribution to the increase of RM82 million out of the RM125 million, must be excluded or we must stop it. It does not mean that savings cannot be done. But cross the board between 2% to 5%, speaking in English here, between 2% and 5%, must be stopped merely to show savings. And in the end we had to make this budget addition after it was not possible or it was necessary. So we must follow the trend, Honourable Member, in management and also finance. The trend every year in how our officers move, indeed in the State of Selangor our officers are active in movement, including on weekends, and we need to give a boost to what they do on weekends.
I agree with that view of the Honourable Member. If possible, this culture of constantly adding is not appropriate. But if we add, as I mentioned earlier, there are several matters that we must change or must add to with announcements outside that context, we must do it.
Honourable Member, perhaps there are certain matters involving things beyond control concerning court cases. Sometimes these court cases involve certain settlements or decisions that will be made by the court, because the claims between both parties end with decisions made by the judge and end with assessments made by the legal team. It is not easy for us to make that decision, or what is called, we try to avoid it, but or try to give in. But there are several cases which, if we settle early, can actually be resolved. I take the example of TTDI and MSN. If we had settled early, the possible cost we bear now would not be as heavy as the settlement before that, because it is proven that we had admitted to the debt that had been incurred. Of course it was not our era, or the era before 2008, but we have to be responsible for these matters. Therefore I admit that the State Government tried to defend. For example, when the Honourable Member for Gombak Setia said we should settle the matter concerning the Canal City land. That was only a proposal from the MBI side, but the State Executive Council did not agree. We want to fight on in that case, because we see that the 2016 decision on the land taken over and the approval of RM60 million that we had set is a decision that has provided a settlement for that land. However, I want to inform you that there is a technical issue which I need to investigate as to why that could happen, which involved submission and so on, and we cannot make decisions based on negligence or mistakes we ourselves made. And I must ensure that this does not recur or arise again.
Regarding how many external settlements there are, eventually we are also well aware that several agreements made before we worked together previously were agreements that were rather favourable to certain parties and in the end put pressure on the government. That is the agreement, which indeed binds us and we have to arrange and we have to organise. Sometimes when we want to arrange, okay, it will be like KJS Cell, which can be managed. But if it cannot be managed, eventually it will become a claim, and that claim we have to bear. Not today, perhaps in the future. Not in our time as the government, perhaps under someone else's government. But that is the norm and a responsibility that must be shouldered by the government together. Thank you.
Honourable Members all, the proposal before this House is that this Bill be read a second time now.
Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Second reading. This Bill is entitled an Enactment to authorise the use of a sum of money from the State Consolidated Fund for additional expenditure for services for the year 2023 and to appropriate that sum of money for specific purposes for that year.
Pencadang.
Mr Speaker, I propose that the House sit in Committee to deliberate clause by clause of the Supplementary Bill 2023.
Penyokong?
Mr Speaker, I second.
Honourable Members, the House resolves itself into a Committee.
Clause 1 and Clause 2.
Clause 1 and Clause 2 stand part of the Bill. Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Jadual.
The Schedule stands part of the Bill. Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Mr Chairman, I respectfully propose that this Bill, which has been deliberated and agreed to at the Committee stage, be brought to the House now.
Mr Chairman, I second.
The House resumes.
Mr Speaker, I would like to inform this House that this Bill has been considered in Committee and has been fully agreed to without amendment. Therefore I propose that this Bill be read a third time and passed now.
Mr Speaker, I second.
Honourable Members, the proposal before this House is that this Bill be read a third time and passed now.
Honourable Members who agree, please say aye. Honourable Members who do not agree, please say no.
Agreed to.
Motion No. 4 of 2023 Motion on Development Allocation 2024Motion
The third reading of this Bill may be named the Supplementary Appropriation Enactment 2023. The next item in the order of business is Motion No. 4 of 2023, Development Allocation Motion 2024.
Pencadang?
Mr Speaker and Honourable Members all, I have the pleasure of moving a motion in this honourable House, which reads as follows: that, pursuant to section 9, subsection 4(3) of Akta Kumpulan Wang Pembangunan 1966, this House resolves that the allocation of One Billion, Two Hundred Million Ringgit (RM1,200,000,000.00) stated in the Anggaran Perbelanjaan Pembangunan (Development Expenditure Estimates), tabled before the House pursuant to section 4(1) of the same Act, as contained in the Schedule, be approved.
Honourable Mr Speaker and Honourable Members all, a total of RM7,160,595,090.00 (Seven Billion, One Hundred Sixty Million, Five Hundred Ninety-Five Thousand, Ninety) has been allocated for the ceiling of the First Selangor Plan (RS-1) for the years 2021 to 2025. The said amount includes RM1,200,000,000.00 (One Billion, Two Hundred Million Ringgit) to finance state development projects for the year 2024. The allocation by Head is as in the 2024 Development Proposal.
A total of RM906,260,000.00 (Nine Hundred Six Million, Two Hundred Sixty Thousand) has been allocated to the Office of the Menteri Besar and State Secretary. The allocation by Sub-Head, or P.K., is as follows: RM49,000,000.00 (Forty-Nine Million) has been allocated to Sub-Head 1 or P.K 1 - Economy. The allocation is intended to cover expenditure on research into economic, industrial and investment development, as well as Smart Selangor initiatives.
For P.K 2 - Rural Areas, an allocation of RM38,580,000.00 (Thirty-Eight Million, Five Hundred Eighty Thousand) is provided to finance programmes on agriculture, plantations and basic agro-industries, socio-economic development, traditional village economic development, rural development, village public/basic facilities, upgrading/rehabilitation of rural roads, and the development of new villages.
SCHEDULE
DEVELOPMENT EXPENDITURE ESTIMATES 2024
Code Title Amount (RM) P.01 Office of the Menteri Besar and State Secretary 906,260,000.00 P.04 Selangor State Treasury 500,000.00 P.08 Selangor State Department of Agriculture 10,000,000.00 P.10 Selangor State Forestry Department 6,000,000.00 P.12 Selangor State Public Works Department 145,000,000.00 P.13 Selangor State Irrigation and Drainage Department 65,000,000.00 P.14 Selangor Islamic Religious Department 60,000,000.00 P.16 Selangor State Town and Rural Planning Department 2,240,000.00 P.17 Selangor State Veterinary Services Department 5,000,000.00 Total 1,200,000,000.00
For P.K 3 - Entrepreneurs, an allocation of RM4,400,000.00 (Four Million, Four Hundred Thousand) is provided for the Selangor Micro Entrepreneur Fund, entrepreneur promotion, micro entrepreneur training, and the programme to improve the packaging of products of entrepreneurs in the State of Selangor.
Meanwhile, for P.K 4 - Social, RM88,828,000.00 (Eighty-Eight Million, Eight Hundred Twenty-Eight Thousand) is provided for community services, development of Orang Asli affairs, human capital development programmes, social development programmes, consumer affairs, cultural programmes, non-Islamic affairs, national mindset development programmes, the halal industry, disasters and Islamic affairs.
Next, for P.K 5 - Education, a total of RM69,400,000.00 (Sixty-Nine Million, Four Hundred Thousand) is provided to implement education programmes as well as higher education, school assistance projects, technical skills programmes and the development of education for the Indian community.
For P.K 6 - Women, Welfare and Health, RM181,490,000.00 (One Hundred Eighty-One Million, Four Hundred Ninety Thousand) is provided to cover development expenditure for women and families, community welfare, public health development and unity.
For P.K 7 - Youth and Sports, RM25,251,000.00 (Twenty-Five Million, Two Hundred Fifty-One Thousand) is provided for youth development projects, upgrading/building new sports infrastructure, sports development and football development in the State of Selangor.
For P.K 8 - Caring Government, RM3,300,000.00 (Three Million, Three Hundred Thousand) is provided for caring government programmes, development of the Indian community, assistance to Non-Governmental Organisations and workers' empowerment.
For P.K 9 - Urban Areas, RM37,700,000.00 (Thirty-Seven Million, Seven Hundred Thousand) is to cover the cost of basic facilities and public amenities of the Local Authority (PBT), transportation, solid waste management, and local government.
For P.K 10 - Tourism, an allocation of RM6,000,000.00 (Ringgit Malaysia Six Million) is provided to cover the cost of tourism promotion and events, to develop handicrafts, and to upgrade tourism products.
Next, for P.K 11 - Information Technology and Innovation, RM17,600,000.00 (Seventeen Million, Six Hundred Thousand) is provided to implement ICT as well as Science, Technology and Innovation projects.
For P.K 12 - Environment, RM7,702,600.00 (Seven Million, Seven Hundred Two Thousand, Six Hundred) is provided for environmental programmes, green technology and the rehabilitation of disposal sites.
For P.K 13 - Malay Customs and Heritage, a total of RM6,000,000.00 (Ringgit Malaysia Six Million) is provided for upgrading the equipment of the Sultan Alam Shah Museum (MSAS), upgrading the equipment of Bangunan Anggerik, developing district museums, research on Malay customs, language, arts, culture and heritage, upgrading historical sites of old monuments, purchasing artefacts/collections, or filling the infrastructure and equipment of the Stamp Museum.
P.K 14 - Libraries, a total of RM16,500,000.00 (Sixteen Million, Five Hundred Thousand) is provided for the RATU project, or Pustaka Raja Uda, Raja Tun Uda Phase 2B, upgrading district libraries (continuation project), the Kuala Selangor District Library, building a new Sepang District Library, upgrading town libraries, upgrading branch libraries, upgrading village libraries, equipment and collections, IT infrastructure development projects, the international literary translation programme, and reading promotion programmes.
For P.K 15 - Housing and Urban Well-being, RM11,000,000.00 (Ringgit Malaysia Eleven Million) is provided to cover the cost of several identified projects. These include the rehabilitation works of the Projek Perumahan Rakyat, Kehidupan Bandar Komuniti Sejahtera, the CERIA Scheme (Caring Government for Resident's Aid) and TEPAT (Tabung Pemulihan Projek Terbengkalai).
For P.K 16 - Development of Selangor Water Supply Projects, RM102,000,000.00 (One Hundred Two Million) is provided by the State Government. Among the main projects under this Sub-Head are the construction of the Kuala Langat Labohan Dagang Water Treatment Plant (LRA) and the Selangor Raw Water Guarantee Scheme (SJAM).
P.K 17 - State Special Projects, RM9,000,000.00 (Ringgit Malaysia Nine Million) is provided to cover the cost of several identified projects. These include the construction of the Stamp Museum, the Textile Museum and the Seri Banting Dredger.
For P.K 18 - Selangor Caring Commitment Programme, RM116,800,000.00 (Ringgit Malaysia One Hundred Sixteen Million, Eight Hundred Thousand) is provided for the Women's Health Scheme, the Child Allowance for Nursery (Asuh Pintar), National Awareness, the Higher Education Institution (IPT) Scholarship Programme, the Tunas Scheme, the Selangor Children's Heritage Fund (TAWAS), the Golden Age Friendly Scheme (SMUE), the Free Water Programme and the Selangor Child Commitment Programme.
P.K 19 - A total of RM115,708,400.00 (One Hundred Fifteen Million, Seven Hundred Eight Thousand, Four Hundred) is provided for the rehabilitation of government buildings, land acquisition and various other projects.
Honourable Mr Speaker and Honourable Members all, next, the development allocation for P.04 - Selangor State Treasury. A total of RM500,000.00 (Ringgit Malaysia Five Hundred Thousand) has been allocated to P.04 - Selangor State Treasury under P.K 1 for ICT Development for the purpose of upgrading the Virtual Data Recovery Centre (VDRC) system at the Selangor State Treasury.
P.08 - Selangor State Department of Agriculture. RM10,000,000.00 (Ten Million) has been allocated to P.08 - Selangor State Department of Agriculture. Of this amount, RM1,000,000.00 (Ringgit Malaysia One Million) is allocated to P.K 1 - Development of Food Production Conservation Areas (TKPM) at Sungai Blankan and Ulu Chuchuh, Sepang; Bukit Changgang and Kundang, Kuala Langat; Batangsi Ulu Langat; TKPM Batu Arang Gombak; and TKPM Sungai Panjang, Sabak Bernam.
P.K 2 - Development of Agricultural Practices. What I said just now was RM1 million, yes. P.K 1, RM1 million. P.K 2, Development of Agricultural Practices, a total of RM200,000.00 (Two Hundred Thousand) has been allocated.
For P.K 3 - Development of Agricultural Downstream Products, RM1,000,000.00 (One Million). P.K 4 - Development of Target Groups, a total of RM1,500,000.00 (One Million, Five Hundred Thousand) is allocated for training programmes for target groups, Agricultural Engineering Training at PLKP Tanjung Karang, Agricultural Incubator Training at PLP Kalumpang, innovation and technology development, Strategic Partner Development, as well as the Direct Sales Programme for Crops and the Basic Agro-Industry.
P.K 5 - Development of Paddy Cultivation, a total of RM1,500,000.00 (One Million, Five Hundred Thousand) is allocated for increasing paddy yields, conservation and rehabilitation of paddy field soil in paddy areas, production of MyGAP Paddy, and integrated pest management for paddy crops.
P.K 6 - Development of Coconut Cultivation, RM400,000.00 (Four Hundred Thousand) is allocated for replanting coconuts and rehabilitating coconut plantations.
P.K 7 - Development of Fruit Cultivation, RM300,000.00 (Three Hundred Thousand).
P.K 8 - Development of Vegetable and Market Garden Cultivation, RM700,000.00 (Seven Hundred Thousand).
P.K 9 - Development of Industrial Crops, Herbs and Floriculture, RM300,000.00 (Three Hundred Thousand).
P.K 10 - Technology Development, RM2,000,000.00 (Two Million).
P.K 11 - Development of Animal Feed Crops, RM50,000.00 (Fifty Thousand).
P.K 12 - Development of Honey Bee and Kelulut Honey Production, RM250,000.00 (Two Hundred Fifty Thousand).
P.K 13 - Development of Agro-Tourism, RM400,000.00 (Four Hundred Thousand).
P.K 14 - Development of Agricultural Complexes and Centres, RM400,000.00 (Four Hundred Thousand).
P.10 - Selangor State Forestry Department. A total of RM6,000,000.00 (Six Million) has been allocated to P.10 - Selangor State Forestry Department. Of this amount, RM1,700,000.00 (One Million, Seven Hundred Thousand) is allocated to P.K 1 - Forest Resource Management Programme, which aims to strengthen forest resources, the Central Forest Spine (CFS), and the maintenance of forest resources.
P.K 2 - A total of RM1,280,000.00 (One Million, Two Hundred Eighty Thousand) for the Forest Resource Development Programme, for the maintenance and conservation of degraded forest areas; the conservation and maintenance of mangrove forest areas (planting and treatment/maintenance of planted areas); the development and management of the Peat Swamp Forest Excellence Centre; the development and management of nursery sites; the development of herb plantations; the management of rare plantations; the management of the Virgin Jungle Reserve (VJR); and the management of High Conservation Value Forest (HCVF) areas.
Under P.K 3 - Forest Protection and Innovation Programme, a total of RM300,000.00 (Three Hundred Thousand).
P.K 4 - Social Forestry Programme, a total of RM1,120,000.00 (One Million, One Hundred Twenty Thousand.
P.K 5 - Forest Development and Engineering Programme, a total of RM1,240,000.00 (One Million, Two Hundred Forty Thousand).
P.K 6 - Forest Enforcement Programme, a total of RM300,000.00 (Three Hundred Thousand).
P.K 7 - Forest Commercialisation Programme, a total of RM60,000.00 (Sixty Thousand), which has been provided for the development and management of non-timber forest resources (rattan materials) in Permanent Forest Reserves in the State of Selangor.
Honourable Mr Speaker and Honourable Members all, P.12 - Selangor State Public Works Department (JKR), a total of RM145,000,000.00 (One Hundred Forty-Five Million), of which RM27,249,800.00 (Twenty-Seven Million, Two Hundred Forty-Nine Thousand, Eight Hundred) is allocated to P.K 1, and its content covers various road development programmes, aimed at rehabilitating slopes; land acquisition; upgrading roads; preliminary works and gazettement of roads; installing street lights and traffic lights; and enhancing road safety aspects on State roads throughout Selangor.
P.K 2 - Construction of Bridges and Footbridges, a total of RM12,650,010.00 (Twelve Million, Six Hundred Fifty Thousand and Ten) is allocated for upgrading and building bridges and footbridges identified by district across the State of Selangor.
P.K 3 - Road Construction, a total of RM29,900,050.00 (Twenty-Nine Million, Nine Hundred Thousand and Fifty) for roads according to priority.
P.K 4 - Road Upgrading, a total of RM68,200,140.00 (Sixty-Eight Million, Two Hundred Thousand, One Hundred Forty) is allocated for upgrading roads across all districts.
Meanwhile, under P.K 5 - Construction and Upgrading of Building Projects, a total of RM7,000,000.00 (Seven Million) is allocated for various building projects; rehabilitating palaces throughout the State of Selangor; and integrated development of workshops and related facilities for district JKR.
P.13 - Selangor State Irrigation and Drainage Department (JPS), a total of RM65,000,000.00 (Sixty-Five Million), and of this figure, RM23,590,030.00 (Twenty-Three Million, Five Hundred Ninety Thousand and Thirty) is allocated for the Development of Flood Mitigation Projects, or within P.K 1 under P.13.
P.K 2 - Development of Drainage Systems, a total of RM8,440,564.42 (Eight Million, Four Hundred Forty Thousand, Five Hundred Sixty-Four and Forty-Two Sen).
P.K 3 - Development of River Basins, a total of RM10,946,760.00 (Ten Million, Nine Hundred Forty-Six Thousand, Seven Hundred Sixty) is allocated for riverbank reinforcement projects, construction of embankments and barriers, and construction works, upgrading of trash traps and log booms throughout Selangor by district.
P.K 4 - Development of Water Resources and Hydrology, a total of RM800,020.00 (Eight Hundred Thousand and Twenty) is allocated for the construction and upgrading of stations, and the development of flood forecasting and warning systems.
Under P.K 5 - Environmentally Friendly Drainage Management, a total of RM7,939,019.66 (Seven Million, Nine Hundred Thirty-Nine Thousand, Nineteen and Sixty-Six Sen) for programmes to build and upgrade retention ponds, the Environmentally Friendly Drainage Master Plan (PISMA) in various districts, and erosion, sediment and water quality control in various districts.
P.K 6 - Coastal Development, RM4,222,160.00 (Four Million, Two Hundred Twenty-Two Thousand, One Hundred Sixty) is allocated to strengthen coastal barriers, and for coastal maintenance and conservation plans.
For P.K 7 - Development of Mechanical and Electrical Infrastructure, a total of RM2,560,000.00 (Two Million, Five Hundred Sixty Thousand) for efforts to modernise and upgrade the hydro-mechanical system for sluice gate control, pump houses and trash racks.
Next, for P.K 8 - Development of Building Infrastructure, a total of RM4,000,000.00 (Four Million) is allocated to build and complete six (6) new sluice gate quarters, replacement of two (2) existing quarters, and an Office Complex for the Irrigation and Drainage Department, as well as upgrading quarters in various districts.
P.K 9 - Departmental ICT Development, a total of RM600,000.00 (Six Hundred Thousand) is allocated, and P.K 10 - Miscellaneous, a total of RM1,901,445.92 (One Million, Nine Hundred One Thousand, Four Hundred Forty-Five and Ninety-Two Sen) is allocated for unforeseen emergency works of JPS.
Honourable Mr Speaker and Honourable Members all, P.14 - Selangor Islamic Religious Department, an allocation of RM60,000,000.00 (Sixty Million) under P.14, namely the Selangor State Islamic Religious Department. P.K 1 is an allocation of RM14,935,090.00 (Fourteen Million, Nine Hundred Thirty-Five Thousand and Ninety) for religious schools, intended to rehabilitate religious schools in every district.
P.K 2 - Islamic Religious Offices, a total of RM3,900,000.00 (Three Million, Nine Hundred Thousand) is allocated to rehabilitate and upgrade the buildings of the District Islamic Religious Offices, the Selangor Islamic Complex, the Selangor Dakwah Training Institute (ILDAS), and the Exhibit Storage Warehouse of the Halal Management Division.
P.K 3 - Mosques, a total of RM34,964,910.00 (Thirty-Four Million, Nine Hundred Sixty-Four Thousand, Nine Hundred and Ten) is allocated to rehabilitate and upgrade mosques throughout Selangor.
P.K 4 - Surau, a total of RM200,000.00 (Two Hundred Thousand) is allocated for rehabilitation and upgrading works on surau.
P.K 5 - Miscellaneous, a total of RM6,000,000.00 (Six Million) is allocated to upgrade mosque quarters in every district in the State of Selangor.
Also P.16 - Selangor State Town and Rural Planning Department. A total of RM2,240,000.00 (Two Million, Two Hundred Forty Thousand) has been allocated to P.16 - Selangor State Town and Rural Planning Department. And P.K 1 is RM100,000.00 (One Hundred Thousand) for the Development Plan for the physical review programme of the 2035 State Structure Plan.
P.K 2, town planners, a total of RM1,049,000.00 (One Million, Forty-Nine Thousand) is allocated for the Sustainable Development of the State of Selangor and World Heritage Site projects.
P.K 3 - Special Projects, a total of RM1,050,000.00 (One Million, Fifty Thousand) is allocated to cover the cost of special studies to be carried out by the Town and Rural Planning Department.
P.K 4 - Selangor State Geospatial Information Centre, a total of RM41,000.00 (Forty-One Thousand) for the Development Plan Monitoring System. P.17 - Selangor State Veterinary Services Department, a total of RM5,000,000.00 (Five Million) is allocated, where P.17, the Selangor State Veterinary Services Department, amounts to RM670,000.00 (Six Hundred Seventy Thousand) for the Development of Ruminant Livestock Commodities, namely the Selangor Ruminant Modernisation Programme and the Selangor Ruminant Feeding Programme. P.K 2 - Development of Poultry/Non-Ruminant Livestock Commodities, a total of RM200,000.00 (Two Hundred Thousand).
For P.K 3 - Development of Livestock-Based Downstream Industries, a total of RM350,000.00 (Three Hundred Fifty Thousand) is allocated for the production and development of Livestock Basic Industry (IATn) products, as well as the development of the IATn workshop and IATn laboratory.
P.K 4 – for or P.K. 4, Veterinary Health, a total of RM240,000.00 (Two Hundred Forty Thousand) is allocated for the Caring for Animals Community Programme, animal disease control and Veterinary Clinics.
Next, for P.K 5 - Regulatory, a total of RM10,020.00 (Ten Thousand and Twenty) is allocated for slaughterhouses, animal welfare, sustainable livestock farming and food safety.
P.K 6 - Competency Development, Agropreneur Guidance, a total of RM330,000.00 (Three Hundred Thirty Thousand) is allocated for developing Agropreneur competency.
P.K 7 - Strengthening the Quality of Veterinary Services, a total of RM1,830,000.00 (One Million, Eight Hundred Thirty Thousand) is allocated for offices and staff quarters, as well as the development of the Selangor Veterinary Information System (VETSEL).
For P.K 8 - Development of Food Production Conservation Areas (TKPM), a total of RM964,980.00 (Nine Hundred Sixty-Four Thousand, Nine Hundred Eighty) is allocated for the development of TKPM/Agrotek, broiler chicken TKPM and the development of TKPM fodder.
P.K 9 - Development of Ruminant Breeding in the State of Selangor, a total of RM285,000.00 (Two Hundred Eighty-Five Thousand) is allocated for the development of ruminant breeding and the development of Smart Selangor sado cattle.
Meanwhile, under P.K 10 - Development of the Sungai Nilam Veterinary Technical Training Centre, a total of RM120,000.00 (One Hundred Twenty Thousand).
Honourable Members all, accordingly I respectfully move the Development Proposal of the 2024 Budget Estimates. Thank you.
Mr Speaker, I support.
Honourable Members all, the matter before this House is a motion that has been brought by Y.A.B. Dato' Menteri Besar, namely the Development Allocation Motion 2024. Therefore I put forward this motion for debate.
Seri Kembangan.
Thank you Mr Speaker. The Opposition Leader has no voice anymore.
Seri Kembangan, Seri Kembangan.
I would like to refer to page...
Fifteen minutes, yes.
197, PK.2, Project Code 02007 Kampung Baru Development. Under this project code a total of RM4 million has been allocated. Previously the State Government held the Baik Selangor Programme to discover talent among the residents of Kampung Baru. After two years of this programme, many unique and special local products were improved in terms of marketing or product placement. I would like to propose that this effort be continued so that products that have received recognition as Baik Selangor products can promote the names of their villages not only domestically but throughout the world as well. I take note that on page 199, PK.10, Project Code 10003, the State Government has allocated RM1.6 million to upgrade tourism products. This allocation is indeed insufficient to promote all tourist attractions across Selangor, but if we combine the development efforts of Kampung Baru and tourism, directly and indirectly tourists will tour Selangor first and return home with local products, especially our Baik Selangor products. Thus, access to obtaining Baik Selangor products is very important. I recommend that we could open one Baik Selangor kiosk in every public market in cooperation with the Baik Selangor winners. This effort not only increases access for tourists and our residents to buy Baik Selangor products, it also promotes our public markets as a tourist attraction too.
We can refer to the same page, namely page 199, PK.12, Project Code 12002 Green Technology. Previously I proposed in my budget debate, to install organic compost machines in every public market in order to reduce domestic market waste that would be dumped at disposal sites. Under this project code, the State Government has allocated RM2.5 million to encourage the use or promotion of green technology. I would also like to recommend the installation of solar panels in every public market too so that the maintenance fees of public markets can be reduced, and so that our public markets can be upgraded and prepared to become tourist attractions.
I would also like to refer to page 197, PK.4, Project Code 04001 Community Services. I would like to refer together with page 198, PK.6, Project Code 06002 Social Welfare. Under Community Services, the State Government has allocated RM64.82 million and under Social Welfare a total of RM11.42 million has been allocated. This shows the State Government's concern for our society, especially the B40 group and citizens who need assistance. After Covid-19, one service that is very much needed is ambulance services. For the information of Honourable Members, ambulance services are not free. Some cost RM300.00 or more. Some reached RM1,000.00 during Covid-19. Although there are those who can afford to pay, even those who can pay do not necessarily get ambulance services because we are indeed experiencing a shortage of ambulances. I would like to recommend that part of this allocation be channelled to every State Legislative Assembly (DUN) so that we can establish at least one free ambulance team in every DUN to save the lives of Selangor citizens. I set up a volunteer team during the Covid-19 period and now this volunteer team has acquired three special vehicles to transport Covid-19 patients or those facing emergencies to hospital. Even with three vehicles, they still cannot answer all calls, especially calls from far away from their area.
Next, I would like to refer to page 199, PK.12, Project Code 12003 Conservation of Disposal Sites. Under this project code, the government has allocated RM2.7 million. I would like to ask the government: how many disposal sites can be conserved next year, and how many disposal sites or illegal rubbish dumps are queued up to be conserved? Is this allocation sufficient, and how much allocation and time are expected to still be needed to conserve disposal sites in Selangor? Is it expected that this allocation and time can be reduced after the WTE is built and put into use?
As one of the Board of Directors members of the Selangor Public Library Corporation (Perbadanan Perpustakaan Awam Selangor, PPAS), I take note that on pages 199 and 200, PK.14 Libraries. The total allocation used for new development or upgrading of libraries is RM15.5 million, excluding project codes 14019 and 14020. I am always proud of our libraries, especially the Raja Tun Uda Library located in Seksyen 13, Shah Alam, which can be said to have international status. Under the efforts of the State Government and PPAS, libraries in the State of Selangor have been upgraded one by one and have become comfortable and suitable places not only for reading but also for carrying out suitable community activities. Congratulations to the State Government and also to PPAS. I would like to refer to Project Code 14020, Reading Promotion Project. To foster a spirit of reading among my constituents, I propose that the relationship between State Assembly Members and PPAS be strengthened so that more cooperation can be carried out between these two parties. I am of the view that to foster this spirit of reading, we need to encourage Selangor residents to always feel comfortable with the libraries nearest to them by holding more community activities, such as using library rooms as studios for elderly singing practice, conducting children's drawing classes, and holding picture book reading programmes, with the consent of parents and children together. It is not merely a reading programme. Thus, library facilities can be fully utilised. Residents will become accustomed to hanging out at libraries and, indirectly, the spirit of reading can be encouraged and enhanced.
Finally, I would like to refer to page 257, PK.4, Project Code 04001 Caring Society for Animals, and also the same page PK.5, Project Code 05002 Animal Welfare. Under 04001 only RM20,000.00 has been allocated, and under 05002 only RM10.00 has been allocated. I believe almost all Honourable Members in this House have received complaints regarding stray animals. Until now there has been no effective solution for our state to overcome the increasingly serious problem of stray animals. I am aware that in Sepang, the Sepang Municipal Council has established an animal shelter, namely the Cyberjaya Cat Park, Sepang. This Cat Park is not only a shelter for stray cats, it is also a centre for conservation, a tourist attraction and an educational centre for the public on the responsibilities of being a pet owner. I have also been informed that the Ampang Jaya Municipal Council has approved the construction of a stray animal shelter and is seeking funds to implement the construction. Although the allocations under 04001 and 05002 are insufficient, I suggest that every local authority (Pihak Berkuasa Tempatan, PBT) should make efforts to establish at least one stray animal shelter emulating the Cyberjaya Cat Park, Sepang, by using funds from a small portion of the 10% reserve that can be utilised, as proposed by the State Government in the Selangor Budget 2024. Thus, I beg to support.
Bukit Lanjan.
Only one minute left. Thank you Mr Speaker. There are three matters that I want to touch on in this honourable House, briefly and concisely. I begin with page 197 under P01 Office of the Menteri Besar and State Secretary, with PK.4 Social, Project Code 04002 Orang Asli Affairs Development, where RM500,000.00 has been allocated. I would like to extend congratulations and kudos because under the administration of the State Government of Selangor, no race is excluded from the welfare and development agenda of the state, including the Orang Asli in the State of Selangor. Thank you. I will continue.
Honourable Members all, the time has reached 1.00 p.m. Therefore, I adjourn this sitting until 2.30 p.m. this afternoon. The House is adjourned.
(HOUSE ADJOURNED)
(HOUSE RESUMED) (DEPUTY SPEAKER IN THE CHAIR)
Bismillahirrahmanirrahim. Assalamualaikum W.B.T. Peace and greetings, good afternoon. Let us begin the Development Motion debate today, a continuation from Bukit Lanjan.
Thank you Mr Speaker. The three matters that I mentioned earlier that I want to touch on in this honourable House, I begin with page 197 under P01 04002 Orang Asli Affairs Development, where 500 ribu ringgit has been allocated.
I would like to extend congratulations and kudos because under the administration of the State Government of Selangor, no race is left behind or excluded from the welfare and development agenda of the state, including the Orang Asli in the State of Selangor. Specifically concerning Socio-Economic Development and Welfare of the Orang Asli Affairs. However, I would like to ask the State Government what is the latest status regarding the issue of land compensation and facilities for the Orang Asli at Kampung Orang Asli Desa Temuan, or better known as Kampung Orang Asli Bukit Lanjan.
I understand that a coordination meeting between the relevant agencies was called last month, but unfortunately my side together with the Tok Batin and the representative of MPKK Kampung Desa Temuan did not receive an invitation to this meeting. Considering that this issue has been raised many, many times by the former Honourable Member for Bukit Lanjan before this. Therefore, I hope the State Government takes care and, with sincere heart, truly helps to resolve this issue so that it does not drag on any further, even though it has dragged on for 30 years.
Mr Speaker, the second matter, I refer to the same page 197, PK4 Social, Social Division, Project Code 04007 Non-Islamic Affairs, which has been allocated a total of 6 million. I am grateful for and welcome this large allocation, which can be channelled to temples or churches in support of the State Government's efforts in building, renovation and repair works, or support for community religious programmes and so on. Thus, I have a question for the State Government: why has this allocation been reduced compared with previous years, such as in 2021 when 7 million was allocated, 2022 when 6.3 million was allocated, and this year, 2023, when 8 million was allocated?
The final matter that I want to draw the attention of the EXCO Members to, referring to page 245 under P14 Selangor Islamic Religious Department, PK1 Religious School, Project Code 01300 Petaling Jaya District. I was able to find an announcement by a former Menteri Besar of the State of Selangor on 23 May 2017, published by Selangor Kini, titled: Prasarana Pendidikan Islam Terus di Pertingkat. It was good news especially for local residents in Damansara Damai, who had long applied and waited for this approval. I take the sentence from that announcement, the last sentence in the Selangor Kini publication, "Kerajaan Negeri juga meluluskan permohonan membangunkan 3 buah lagi SRA iaitu SRA Bandar Country Homes, SRA Denai Alam dan SRA Damansara Damai dengan 10 juta setiap satu Pembangunan" katanya.
What I understand from this sentence is that it clearly shows that the application for the construction of SRA Damansara Damai has been approved. I am also informed that the construction of this school was also included in the Budget Book in the previous year, but at this time I see in the list of Project Codes in the Selangor State Budget Book 2024, Project Code 01301 SRA Denai Alam and Project Code 01401 SRA Bandar Country Homes, which have now been completed and are being utilised by local students. Therefore, until today, since the announcement in 2017 by the former Menteri Besar, who at this time has taken on the responsibility as Opposition Leader in this honourable House.
The Opposition apologises in this honourable House, because the atmosphere has been far too cold; it has already been 6 years, 6 years, but not even the outline of the walls of SRA Damansara Damai can be seen yet. There is only the school site; there is not even sand, not even stones, to carry out construction of the school. Therefore, I hope that this caring Selangor State Government can reconsider the approval previously given for the application for the development of SRA Damansara Damai and fulfil this promise, especially considering the residents of Damansara Damai who are still waiting with great hope for the construction of SRA Damansara Damai. Thank you, Mr Speaker, I support this motion.
Thank you Bukit Lanjan. The Honourable Member for Kota Damasara.
Assalamualaikum. Thank you, Deputy Speaker. I would like to refer to page 197, Code PK 2, Code 02006, on the Upgrading and Repair of Rural Roads, for which an allocation of 2 million ringgit has been made. For the Kota Damansara area there are many village roads that need attention. I would like an explanation from the Honourable EXCO or from the State Government regarding "Right Of Way", or R.O.W., roads, which since 2022 can no longer be resurfaced using Government allocations. For the information of the Honourable EXCO, these village roads have several main road sections, and most of them are R.O.W. (Right Of Way) roads. Although residents have to pay the full land tax even though they cannot use the whole road, we should not punish them by not allowing these roads to be resurfaced. I ask the State Government to also increase the allocation given from 2 million, because I believe that my urban area also has some village areas that still have unsurfaced roads.
Next, still on the same page, is Project Code PK4, number 04009, which is the Halal Industry. The Malaysian halal industry is expected to reach about 500 billion ringgit by 2030, so there is a need for the State Government to increase the budget to focus on the halal industry. At the very least, by 2030 we can obtain at least 20% of the total 500 billion that will be generated, because we know that the halal industry in Malaysia is very well known. So we want to focus on Selangor State to be the centre of attention, so that other countries will take it as an example. For those who want to obtain Halal certificates, let them come to Selangor, especially those from overseas. When they come to Selangor, they will get courses from us, certificates from us, and they will use them as references for other countries.
For the same page, PK4 Code 04010 on Disasters. The allocation given is about 500 thousand. I think there have been so many disasters recently. The simplest example I can give is in Kota Damansara, which recently went viral when Uptown Kota Dam, or Uptown Kota Damansara, had a fire. So there is a need for the Government to increase the amount for these disasters, because I understand that these disasters are misfortunes that do not give warning. We also do not know, one day it may happen in Bandar Baru Klang, and it could possibly happen in Kota Kemuning too. But during this sitting week, many in Kota Damansara have been hit.
So I also ask that, if 500 thousand could be increased, because we cannot solve the problem by ourselves, at the very least we show the State Government's concern in easing the burden of those who have been struck by misfortune. Next, I would like to draw attention to page 198, namely PK5 Code 05005 for the Development of Indian Community Education. Most of the hardcore poor are among the Indian community. Their parents are unable to change their families, so it is important for us to ensure that their children are given education, because it is these children who will bring their families out to a better level. Therefore, when we focus more on the Indian community, let the focus be on their children. So if there is any opportunity to add to this allocation, at the very least, in the long term, this will help reduce the burden on the State Government.
On the same page, PK7 Code 07002, on upgrading and building new sports infrastructure. The Government has allocated about 1 million ringgit. If we were to share it equally among about 56 State Constituencies, each DUN would get a small project of 20 thousand for upgrading. I count 52 DUNs that will receive this benefit, so about 6 DUNs will be left behind. So, whichever DUNs will be left behind will become a problem when there are DUNs that we could upgrade but have to be left out, approximately. Therefore, I ask that if there is any addition, at the very least, at least 1 DUN be given 1 allocation to be upgraded according to the DUN, because we also do not know where sports talent originally comes from. It may come from flats, it may come from villages, it may come from towns. If e-sports, most of it comes from urban youth who have better internet connections, but for sports that are for the ordinary people, they come from village areas. So when we choose which areas to upgrade, we worry that our sports generation, which is to represent the State Government in particular, will gradually disappear.
Mr Speaker, Kota Damasara also wishes to draw the attention of the House to page 200, namely PK15 Code 15003 for the Skim Ceria. I request that the State Government give focus and priority to Kota Damansara, because I believe that most of the Kota Damansara urban area consists of strata residents, some of whom, as a result of the relocation of their communities, have started to submit and have submitted applications for the Skim Ceria. However, perhaps because of the long applications from other areas, or the priority given to other areas, I ask that, if it is possible, this year's budget be given priority to Kota Damansara.
On page 215, PK5 Project Code 05002, namely the Sungai Buloh Forestry SUK Complex. It is well known that this complex is located in the Kota Damansara area. I think the allocation for this complex can be increased so that various kinds of awareness campaign programmes can be carried out, especially for young people, so that they know and love the forest. If in the middle of Bandar Kota Damansara there is also a small forest managed by Sungai Buloh Forestry, then indirectly this can also provide early awareness campaigns to young people.
Mr Speaker, on page 231, namely Project Codes 01302 and 01303 for the Flood Mitigation Project for Kampung Melayu Subang at Sungai Pelepas Phase 2, as well as at the Damansara tributary. I would like to remind the government that the project carried out must involve the collapse of the riverbank at the Monsun Drain, as it is called, between Toyota and Gmart, which causes back flow in the Kampung Melayu Subang area, and eventually this flash flood occurs. So it is very unfortunate for the
residents of Kampung Melayu Subang, who year after year suffer losses. So since the budget has already been handed over, I thank the State Government. Only I ask that focus be placed on the projects funded by this budget for the areas I have mentioned.
Next, for page 248, PK3, Code 03104, now we discuss the mosque. The Subang Berstara Bestari mosque for the residents of Kota Damansara, especially for Subang Bestari, has been waiting for the completion of the Subang Bestari Mosque. I thought this mosque had already been built, but there has been a delay. So I think this delay, I can understand. I understand if the delay occurred due to the MCO (Movement Control Order, or PKP), but now there is no more PKP, PKPD, PKPB and so on. It is all gone. There should be no excuse for the contractor not to complete this mosque. At the very least, it would ease the burden on those who pray in that area. While I strongly hope that the State Government will complete the Subang Bestari Mosque. For the same page, under the same Code 03104, for the Construction of the Kota Damansara 2 Mosque. In Kota Damansara, especially in Bandar Kota Damansara, there is only one mosque, namely the Kota Damansara Mosque, or we call it the Yellow Mosque, while the rest around it are surau. So when Friday prayers are held there, everyone gathers at the Kota Damansara Mosque until it becomes congested. I understand that if those who come are a bit late, if they come late from work, they already pray on the tarred road. So the site is already available. Therefore, I humbly request the State Government to expedite the construction of the Kota Damansara Mosque. The infak fund has also been prepared, so I very much hope that if this mosque can be built, at the very least I can invite YAB. Prime Minister to perform Friday prayers in Kota Damansara. Therefore, Mr Speaker, Kota Damansara supports this.
Thank you, Honourable Member for Kota Damansara. I give the opportunity to the Honourable Member for Sijangkang.
Thank you, Mr Speaker. I now move on to Code P01, Office of the Menteri Besar and State Secretary, PK2 Rural Development, Economic Development and Traditional Villages. We can say that every village has night markets, morning markets or farmers' markets, in most of the villages here. But what is happening today is that, with the economy under considerable pressure, most people have lost their jobs, and we can see that the number of traders at the night markets is increasing. Sales at the morning stalls, selling breakfast and so on, are also increasing. In some areas or some villages this is causing traffic problems, especially at peak hours. However, I think the State Government could look at certain areas in the villages, or certain sites, to develop a commercial plaza that would serve as a centre for night market and morning market activities, or for small stall sales that could be gathered there, even though some small traders prefer to sell in front of their houses and so on. But the major issue is road traffic safety, which sometimes leads to accidents and so on. Sometimes there is also a problem where these markets are located at the front of village entrances. And some stalls are not arranged properly, and perhaps their structures give a bad impression to the public. Sometimes they also lead to quarrels among the traders themselves or with buyers or customers.
Next, I come to the upgrading of rural roads. As we are all aware, some of our roads have already reached the end of their lifespan, not to mention when these roads are used by large vehicles as shortcuts or alternative service roads, and containers exceeding the proper load of 8 tonnes, large containers, eventually damage our roads. For this, I feel that perhaps certain allocations, for example under MARRIS, could be larger. Even though it is only for resurfacing, there may be other facilities that help to strengthen the road itself. I see that MARRIS allocations are under rural areas or the JKR, and if we compare them generally with allocations under the municipalities, in municipalities the roads are no longer used by most vehicles carrying loads over 8 tonnes, for example. So the roads are better, and sometimes we see that a housing estate has been resurfaced again within 2 years. But village roads take a long time, some up to 7 years, some 5 years and so on. If we compare roads in housing estates in urban areas, they are better than village roads. I hope there are certain allocations to show how we can balance the needs of rural areas as well.
Besides that, I also want to mention that safety, especially in villages, is also an important matter. We often hear of accidents, especially at four-way junctions and so on. These junctions. And if I look, even in Kuala Langat alone, I see requests from villages for humps or speed bumps to be installed. If PLB or JKR could entertain them, practically every one of these junctions has a Village Safety Development Committee that wants speed bumps installed. If it is a four-way junction, that means 4 speed bumps are requested there, even though there are speed drags or thick paint markings, but they are requested because accidents have occurred. In certain areas, the need for speed bumps is still requested by village residents. However, I think that at state level or district level there should be a guideline, so that only certain areas that are really involved, or that are prone to frequent accidents, or that need them, have them installed.
I would like to take this opportunity to thank JKR Kuala Langat, whose initiative, especially to make a guideline for culverts, the size of culverts that should be built, was taken. Although the guideline already exists, when this emphasis is given and it is also used as a monitoring tool at village level and so on, it creates a better situation. Previously, drains often .. we got a good flow. Likewise, if the matter of speed bumps can be made into a standard or guideline, not everything can be entertained, because our allocations are rather limited, but for certain areas, from the technical point of view, JKR may look at these matters so that they become a standard in the guideline.
Next, PK3 Entrepreneurs – Selangor Micro Entrepreneur Fund. I looked at the reply from the Honourable Member on Hijrah, because I see that the time has come when we should also think about our own agricultural entrepreneurs. Although the number involved today is very small if we compare it within PMKS, not even 2% are involved in agriculture, but how can we stimulate it, especially from the perspective of our real needs. For example, from the issue of agriculture, we need vegetables, a source of vitamins and minerals, for our health, and if we give, it is heard the allocation may be used to hold courses and financial management methods. Because I see that if we plant vegetables, within three or four weeks we already start getting produce. So if we borrow through Hijrah, if we manage the finances well, the repayment method can give us a better return. If we compare with other agriculture, it takes a year or 2 years or 3 years before yielding, and that is why the repayment from Hijrah loans is not as good as we expect.
Next, I come to PK5 Education – school assistance project. Eh, this SBK I have already touched on, I thought I would not touch it again. Unity, which should be under rural areas, if I am not mistaken, but this is under Women, Welfare and Health, previously under the Exco. This PK6 ... But I see how the government can look at these projects, not just as programmes where we see the involvement of racial diversity, but especially for integration or unity programmes, that are truly programmes that we hold that are directly aimed at unity or integration within our country. Perhaps linked to the Rukunegara, to the focus on racial diversity and the religious beliefs we have in this country. Not just programmes that we hope, with racial diversity involved in the programmes, which is indirect.
Next, PK7 – Young Generation and Sports. I see that efforts to develop sports in Selangor must continue to be strengthened, because we also produce many athletes and great sports champions in Selangor. For example, if we look back at a time long ago, the family of Dato' Haji Sidek Abdullah Kamar was famous for badminton. We must also look at how this development can be planned so that there is always ... If in the past their family was famous in sports, how will the next generation be, because otherwise we may lose the ability to produce entrepreneurs and sports champions like this. Because I see that when in Kuala Langat we tried to build a monument to Haji Sidek in front of his house, when he did not receive support from various parties, it remained just that, and eventually it was not maintained and had no effect on sports development in Selangor. Then I also want to mention the development of football in Selangor, allocated RM10 million. I do not deny the contributions to the Selangor Football Association, for example, but I also want there to be contributions to other associations in Selangor, which I see also promote sports in Selangor, such as PBMS (Persatuan Bola Sepak Melayu Selangor), and I think their achievements are no less impressive. I am also informed that the Conference of Rulers Cup, if I am not mistaken, will have a semi-final on this Saturday at UiTM Stadium, involving Persatuan Bola Sepak Melayu Selangor itself, and I have allocations to help them manage the association, and eventually also to become a source of excellence in football in our country. This PBMS, although its name is Persatuan Bola Sepak Melayu Selangor, in the Conference of Rulers Cup also involves players of various races as footballers in our country.
Next, PK9 Municipal – as I debated in my policy speech the other day, perhaps the Menteri Besar cannot answer, and I have not yet received a written reply. I want to repeat the application from the cooperative KOWAJA, Koperasi Wanita Jaya, which uses part of the open land in Taman Dato' Hormat for childcare centre (taska) and PDK activities, and I think the land used is not large. The building has been there since the 1980s and has had a very good impact. This could be considered, because I mentioned that previously the Selangor State Government had a policy of RM1 thousand for land occupied by squatters or settlers, as long as it is not sold. I hope this can be extended to perhaps NGOs that provide good community welfare programmes, for the continuity of their work. What is wrong with selling ownership at a premium of RM1 thousand as long as they use it for the purpose they applied for?
Next, regarding transport – allocation of RM6.6 million, as we are aware. The time has come for the Smart Selangor bus to be in rural areas. The routes we choose can be chosen, not the main routes, not the prime routes. Non-main routes like this have no response, and
I hope this can be changed into a system where we can give buses to those who are less able financially but who have high usage, especially school students and so on, that we can think about. Next, solid waste management. I think in housing areas it is not a problem; the local authority area is not a problem. But in village areas, we place bins or refuse bins, and in these village areas there are many disputes. No one wants this refuse bin to be in front of their house. And I think the collection issue is not resolved, which may be beyond the capacity of the PBT to collect, perhaps at alternate intervals and so on, and the dumping, which is sometimes very obvious, especially with disturbance by stray dogs, scattered rubbish and so on. I hope better monitoring can be carried out. Previously, every Monday during the past week, the EXCO answered covert monitoring. I think that is already outdated. Perhaps CCTV could be installed to look at matters, improper matters, in solid waste or rubbish disposal in these village areas. Next, PK 14 Special Project, Taman Sri Medan Kuala Langat Library. I think the Menteri Besar still has not had the chance to answer this either. I would like, if possible, to have it answered during this debate. An allocation of RM4 million was made before, but next year there is no more, whether token or any allocation, and this project has in fact been running for more than a term, roughly. This project was carried out at the same time as the Sri Setia Library. The Sri Setia Library is finished already, it is already in use, but the Taman Sri Medan Kuala Langat Library still has not started operating. I want to know, when will it be developed, will it also be developed in this term, or how?
Next, Programme PK 18, Iltizam Negeri Selangor Programme. I still hope the Government will give my last written reply, ten (10) written replies, nine (9) I have received, one (1) I have not yet received. I am asking about the status of the Iltizam Negeri Selangor programmes, because I think this is very important for us in the opposition as well, to provide information to residents in our areas, because there is always information that does not reach them, and sometimes we also do not know whether programmes are still running or not. For example, the other day we had the Youth Marriage Incentive Programme, then it was cancelled, then it was held again after receiving views from Honourable Members in this House, but I see it only runs until 2001, only a few, and if, if I did not have that status, perhaps I could not give information to residents in my area. Next, I move on to P08, Selangor State Agriculture Department. I would like to ask about TK 1, Bukit Changgang Permanent Food Production Park, Kuala Langat, especially regarding the resettlement of ruminants or cattle that are scattered in areas, because I see that in Kuala Langat, in the Morib or Kelanang areas, it has led to quarrels and even accidents involving these cattle, until the Village Head resigned because the cattle could not be managed. However, my question is, I was informed this centre still cannot function because of the land conditions, which are still flooded. So I hope that, if possible, to solve this problem, although some of them are indeed difficult to gather in one place because of distance and so on, at least when this livestock centre can be developed, it will have an impact on those who truly want to develop this effort, so that they can use it as best as possible.
If possible, please finish up.
Okey, saya..
Dah habis?
One more. Can I?
Last, yes, one more.
Okay, for this, I will ask for two (2), one, I want to seek certainty regarding the upgrading of Jalan B129, Jalan Garuda or Jalan Masjid Batu 9 Kebun Baru, which was mentioned yesterday by the Honourable EXCO member but is not in the Details P12 Public Works Department, and the last one concerns P13 Selangor State Irrigation and Drainage Department, Kuala Langat district, Sungai Sijangkang Flood Mitigation Scheme. I want to know what the activities and components of this flood mitigation are, and when they will begin. I received information that it was supposed to have started and when it will be completed, because I see floods still occur at several of these spots, as mentioned in the previous sittings. In Kuala Langat, only one spot is listed, namely Jarum Mas, an area that often floods, and I hope there may be studies, I see that in Kuala Langat there are actually more than that. If possible, a re-study should be carried out to determine how many spots there really are, so that we can finally overcome this flood problem in a more thorough way. Thank you, Mr Speaker.
Thank you, the Honourable Member for Sijangkang. The House welcomes a visit to the Selangor State Legislative Assembly sitting by students of Kolej Tingkatan 6 Shah Alam. There are 17 of them, led by Cikgu Zahar Nordin. I now invite Batu Tiga.
Assalamualaikum W.B.T. Mr Speaker and all Members of the House. I would like to touch on several matters, the first being from P01 Office of the Menteri Besar under the item Project Code PK 15 15003 Skim Ceria, allocated RM7 million. I would like to ask how much, or when, this allocation can be delivered to DUN Batu Tiga, because I took a sampling at Seksyen 24, among which we have 84 blocks of medium-cost and low-cost flats that require quite a large expenditure to improve or brighten the building areas. Of course, I understand that Skim Ceria does not involve any works relating to structure, but my view in the debate the other day, where I mentioned redevelopment, also needs some emphasis, because these buildings are already very old, so it may be that they do not need Skim Ceria and instead require quite a large cost for redevelopment.
I move on to PK 18 Iltizam Selangor Penyayang. Under item 180005 Kesedaran Kenegaraan, which is given or allocated for Team Selangor, established in 2017. I read that the performance and activities of Team Selangor do carry out volunteer and community programmes and also assist in the flood missions that occurred in 2021, but I see that in 2024 its allocation has decreased from RM10 million to RM5 million, whereas the performance, as I understand it, done by Team Selangor is already quite good. I would also like to ask the EXCO line-up or the Government line-up: can we, as I once asked the Honourable EXCO for Sports and the Honourable EXCO for Youth, combine and empower all the youth platforms that we have? Among those I can mention, we have Team Selangor, we have PeBS, and we once had SERVE, each of which has its allocations, but when we look at the breakdown, some goes to Team Selangor, some goes to PeBS, some goes elsewhere? So, what does it mean for us to develop these youth when we are all moving in silos? I am of the view that we should combine all these initiatives so that we can implement a very effective programme to develop our youth, and this may be the basis for why the reduction was made. I need an explanation from the Government?
Under that too, on the next page, 18009 under PK 18 also has SMUE and SMIS, but it is stated in this, it is stated as SMUE (Usia Emas). I am asking about SMIS (Skim Mesra Insan Istimewa): whether it is possible, if we maintain that the only condition for applying for SMIS is holders of OKU cards only. I lean towards keeping only OKU cardholders eligible to apply, because I want to help the Department of Social Welfare (JKM) in increasing the number of OKU card registrations. I once mentioned that today we are at 112,000 at the level of the Selangor State Government, at the level of registration in Selangor State, whereas WHO stipulates that the percentage of OKU persons who should be registered should reach 15% of the country's population. So, at the national level we are only at 4.9 million, and it is still far from what we target. So, I hope the Skim Mesra Insan Istimewa can become a driver for parents to encourage the implementation of OKU card registration, because apart from the benefits available in Selangor State, there are also many benefits provided by the Federal Government.
I move on to PK 6 Wanita Kebajikan dan Kesihatan under item 06002 Kebajikan Masyarakat. I would like to ask how much allocation has been set for BINGKAS in 2024. First of all, I would like to congratulate the Government in advance, because the Government has implemented a leap compared with KISS, which was introduced in 2018. KISS was introduced in 2018 to help mothers, which is why its name is Kasih Ibu Smart Selangor. But thankfully, in 2022 a programme was developed or created that was given new life, not only helping mothers but helping fathers and all family members. That means the condition for applicants is no longer women. So, I hope that from this programme and its benefits there will be more help for welfare. We have raised the benefit for recipients from RM200.00 to RM300.00 a month. We have also increased the number of recipients to 30,000, and we have raised the household income ceiling from RM2,000.00 to RM3,000.00. This is a leap for which I can give praise to the Government, because it has implemented a programme that truly internalises the problems faced by the people. And I would also like to get a little explanation: is the BINGKAS programme limited only to families with an income of RM3,000.00 and below, without taking into account the number of family dependants? I mean, how many family members there are in that family, the members within that family. So, first, I want to consider whether we can take into account the number of family members in that family. That is, if perhaps the income is RM3,000.00 but there are two (2) children, okay, but if the income is RM4,000.00 but there are five (5) or six (6) children, for example, I am giving an example. And second, I would also like to propose that, if possible, we raise the age of the last dependent child. That is, what is stated in BINGKAS, which says 18 years. I propose that if possible we raise it, because for some B40 groups in Selangor State, even though they have a child of 18 years whom we consider still a dependant, when that child rises to university level, B40 families still need high expenditure. So, I propose that it be considered up to the age of 21, until the child can stand on their own and work after completing their studies. Lastly, I move on to P 13 Irrigation and Drainage Department (JPS). I would like to express thanks for the commitment shown by the State Government in building a retention pond at Padang Jawa, part of which has been completed, and the additional RM520,000.00 in 2024 will also provide a great deal of relief to the residents and people of Padang Jawa. I express thanks for what has been determined by the Government, and I hereby support the expenditure. Thank you.
Thank you, Honourable Member for Batu Tiga. I give the opportunity to Sungai Ramal.
Thank you, Deputy Speaker and all Honourable Members. I also intend to debate the Development Budget motion tabled by the Most Honourable Dato' Menteri Besar this morning. I will touch on two matters, namely human capital development and, secondly, physical development. The human capital development proposed by Dato' Menteri Besar involves the Women, Welfare and Health portfolio, whose total amount is very large, quite large at more than RM181 million.
I would like to draw attention to three matters relating to Women, Welfare and Health, including the family. The first concerns the breakdown of the family institution. Selangor recorded the largest number of family institution breakdowns in Malaysia, namely 8,811 cases for 2021 alone. We know that divorce is among the causes of family breakdown, and it is not the only main cause or the only cause of family breakdown. But this phenomenon of family breakdown is very important for us to look at, and it requires tangible and aggressive programmes to ensure that we reduce the number of family breakdowns among society, particularly Muslims in Selangor. Much research has been done, and it shows that there are three main causes of the breakdown of the family institution. I will mention them one by one for our joint attention so that the Government can look at and address them. The first cause of family breakdown is that marriage is not clear, because many couples tend to marry purely for love and to fulfil sexual needs. Eventually they do not get anywhere; some roads, one year, two years, break down anyway, because they do not feel that this is the true satisfaction of married life.
The second is failure to carry out responsibilities and trusts in marriage. Failure to provide maintenance and domestic violence are among the main causes of failure to carry out responsibilities. They think that with love alone they can feed their spouse. But no, love alone is not enough, which is why there is a saying that to get married you need three "ras": waras (sane), beras (rice), and I have forgotten the other one. That is why love cannot fill a spouse's stomach. They do not understand this. The third is lack of knowledge of household management and marriage. So, this lack of knowledge is among the important reasons why a household breaks down. I would like to suggest to the Government, especially the relevant portfolio, to look at these three aspects as important and to form activities and campaign programmes to address these three main causes.
The second matter, human capital development, also involves the same allocation under the Menteri Besar's portfolio, and I want to focus on the problem of youth, more specifically the problem of fornication among Muslim youth. I repeat, the issue of fornication among Muslim youth. There is a study carried out by Universiti Sains Islam Malaysia that looked at why the number of Muslim youth fornication cases increases every year. There are seven causes that lead to this improper matter. The first is parental divorce, which causes teenage children to fall into this bad state. The second is failure of communication between parents and children. The problem is that mothers cannot communicate well with their children. Children cannot communicate well with their families, which makes it a problem why young people and teenagers fall into fornication.
The third is excessive restriction of children. The fourth is the absence of religious upbringing and lifestyle. Perhaps being too social, the whole family being too open and too exposed to the latest world of globalisation, they become families that are exposed to fornication, especially among teenagers. The fifth is families who commit fornication, God forbid. There are also families that make this kind of life their norm, and when the family itself makes this their norm, surely the teenage children will also follow this indecent trend. The sixth, the consumption of prohibited drugs, also becomes a cause of fornication. And the most serious and most important factor is the seventh, namely the exploitation of teenagers for prostitution by the family itself. There are many cases studied, including those involving FELDA areas, where families in financial difficulty make their family members, and even their teenage children, objects of prostitution to obtain money.
These seven matters are important for us to scrutinise so that I can recommend to the Government that it give focus so that these problems do not continue to plague families in Selangor, insya-Allah.
The third matter regarding human capital development is about syariah legal aid for those in need, especially women or men with low incomes. I read many articles mentioning the existence of legal aid programmes for them, whether at the Federal and state legal aid departments or at the level of the Majlis Agama Islam Selangor (MAIS). But when I go down to the districts, I find that they find it difficult to obtain these legal services because the location of these legal aid centres is in Shah Alam. And in the districts they cannot obtain them unless they have to go to the city of Shah Alam.
The main issue is that they do not understand the procedures and processes handled in court. So they need legal services, and these legal services are not sufficient and do not help them. It is very difficult for them to obtain legal aid and to resolve their problems. I understand this issue very well, because I was involved in syariah law for a long time, more than 30 years, until I succeeded in writing a book. This book I wrote myself and published early this year to help those who need it understand and manage their cases in the syariah court. The book is titled Sedangkan Lidah Lagi Tergigit. As you always hear, I am not promoting this book. I am not saying this to highlight the need for the Government to help those who need syariah legal services to resolve their cases.
Mr Speaker, I would like to move on to infrastructure development. I will keep it brief. The first is the Selangor State Agriculture Department, regarding a project. Oh dear, the EXCO is not here either. The coconut replanting project, which is allocated only RM400,000, is for a project that I think is big and important for food security in Selangor. I ask for an explanation as to whether it involves areas along the route from Kuala Selangor to Sabak Bernam heading towards the border or demarcation with Perak State, a distance of about 100 kilometres, including Sungai Air Tawar, which is among the famous places with coconut planting projects. So, this route is a route that is well known for the most advanced coconut planting project in Selangor. Whether the state will use the same site, the same location, the same route for this programme or how. Because if they use the same route, RM400,000 is very, very small for a project to make coconut a food security programme for Selangor State.
I move on to the PWD (JKR) regarding the upgrading of Jalan B17 from the T-junction at Teras Jenang to the Jenderam junction. I thank the State Government for giving attention in 2024, because this is a delayed project that was supposed to be completed in 2018, which was undertaken by Hulu Kelang when he was Menteri Besar before. It has taken a very long time before the second phase to upgrade this road can finally begin. Alhamdulillah, it is okay. But I would like to make a request and a reminder: when this project begins, please consider the problems that local residents may face, especially heading to Kampung Bahagia Bangi and Pekan Bangi, when they may have trouble getting an alternative road or a second road along the same route if they travel on this road. Because this is the only road. When development is carried out and the road is closed, I am worried it will cause serious disruption to local residents, especially Kampung Bahagia Bangi and Pekan Bangi.
I move on to the floods at Kampung Bangi Tambahan, which I have raised before. I ask for an explanation from the Government. When will this flood reduction project, or this pump, be able to begin? So far it has not begun until today, and I understand that among the causes of the delay is the issue of land acquisition. I ask that the resolution of this issue be expedited so that the community of Kampung Bahagia Bangi no longer suffers from floods that occur two to three times a year.
I move on to the Selangor Islamic Religious Department (JAIS) regarding religious schools. There is one religious school listed in this Budget, namely Sekolah Rendah Agama Bandar Teknologi Kajang, but no allocation has been given by the State Government; it depends only on the Federal Government. I ask for an explanation. When will this school be built, because they have been waiting too long to send their children to a religious primary school. At the same time I would also like to ask about the renovation of other religious primary schools. I take the case of Sekolah Rendah Agama Bangi, which urgently needs the Government's help to resolve the problem of badly damaged roads, toilets that have not been renovated, a surau that needs renovation, and a rubbish house needed for the use of students and staff of Sekolah Rendah Agama Bangi. I ask the Government to take note of and act on my request.
Lastly, the Selangor Islamic Religious Department (JAIS), Masjid West Country Seksyen 5, Bandar Baru Bangi, Hulu Langat. It is stated in the Budget book, but there is no allocation. I very much hope that the site has been laid out widely, the grass has been cut three or four times, and it is ready to proceed with the project here. What is the status of the Masjid West Country Seksyen 5, Bandar Baru Bangi project, because it is not in the 2024 Budget? I ask for an explanation. That is all, thank you, Mr Speaker.
Yes, Kampung Tunku.
Thank you, Mr Speaker.
Firstly, Kampung Tunku would like to refer to page 198 P01 of the Office of the Menteri Besar and State Secretary (Pejabat Menteri Besar dan Setiausaha Kerajaan Negeri) PK9 09005, which is also related to page 253 P16 of the Selangor State Town and Rural Planning Department (Jabatan Perancangan Bandar dan Desa Negeri Selangor) PK1 01001 concerning Greater Klang Valley (Lembah Klang Raya). So I think Greater Klang Valley is an interesting concept, and in preparing for Greater Klang Valley at the local authority (PBT) level, the public transport circle, technology standardisation and data sharing need to be studied with an approach, with permission, localize the operation centralize the system so that the administration of Greater Klang Valley can reap the benefits of skills, with permission, while maintaining flexibility to attract investment and high-quality human capital and become a place of high-technology innovation. The four city councils involved must be prepared to become world-class cities. For example, I take the administrative website of New York City, which uses 11 languages, and the Tokyo Metropolitan Government, which uses 5 languages. This can create new employment sectors and a new face of civil servants who are proficient in multiple languages and become ambassadors of Selangor State and Malaysia to the world. I would also like to draw the State Government's attention to the development of the Guangdong-Hong Kong-Macau Greater Bay Area, with permission, in China as a Macau case study, with permission, for Selangor State. This is due to the complexity of the systems and industries in the nine cities and two special administrative regions under the concept, with permission, of one country two systems.
Next, referring again to page 198, section PK6 Public Health Development, Object Code: 06003. I think the Selangor State Government is a leader among state governments on the issue of mental health, but for almost five years the State Government has tackled our mental health issues, so we need to go beyond the message "It Is Okay Not To Be Okay", with permission. At the Federal level, the Unity Government has succeeded in decriminalising attempted suicide and will establish a Mental Health Institute as presented in the mid-term review of the Twelfth Malaysia Plan (Rancangan Malaysia Ke-12), what's next, with permission. What is the State Government's plan to strengthen and enhance the scope of the Selangor psychiatric treatment subsidy incentive to help mental patients learn to work and live like normal people? I think there needs to be an effort to streamline, with permission, the State Government's public health service network, and the Selangor psychiatric treatment subsidy incentive can be strengthened by adding subsidies for generic psychiatric medication through Selcare Farmasi. Here I would also like to request clarification on Selcare Farmasi: what is its unique proposition, with permission, compared with ordinary pharmacies, do Selangor people gain any advantage from Selcare Farmasi, and what are the financial contributions and liabilities to the State Government, if any? Second, also related to public health, is Selcare Diagnostics. In previous sittings I have proposed that the capability of Selcare Diagnostics be enhanced and expanded. Selcare Diagnostics should not be limited to processing results for the Program Selangor Saring but should be involved in high-technology R&D development. I suggest that Selcare Diagnostics become part of the Selangor Lab Partnership Programme, with permission, so that it can create .. pipeline, with permission, in addition to the service pipeline. Third, still under the same object code, Kampung Tunku wishes to express some concern about the hospitalisation benefit under the Program Iltizam Sihat Selangor, with a maximum of RM10,000.00 a year from selected panel hospitals. The questions from Kampung Tunku are: first, how many recipients have been allocated or targeted by the State Government? What are the assessment criteria, for example the type of illness and, with permission, the urgency of the procedure? Is there any study on the impact of Sihat Selangor assistance, which also offers financial assistance for surgery? My concern is whether this will encourage ISS recipients to switch away from government hospitals, for example, where they could apply to use Sihat Selangor assistance to undertake more expensive medical procedures at private hospitals. Will this benefit become a heavy financial burden on the State Government in future? I think perhaps the State Government, with permission, should set criteria for ISS recipients who receive hospitalisation benefits. For example, for residents of Petaling Jaya, if they are admitted to PPUM in the selected panel hospitals, it is good news for PJ residents because we do not have a government hospital, but with permission, what is good for PJ might be very costly for the state. Public health should preferably focus on prevention rather than treatment, that is, with permission, we should be working to keep people healthy, to keep them out of hospital, so I would like to request some clarification on the cost-benefit analysis, with permission, regarding this hospitalisation benefit. Finally, referring to the heated debate outside on the generational smoking ban policy, with permission, and the exemption of liquid or gel nicotine products from the Poisons Act 1952 (Akta Racun 1952), what is the State Government doing to raise awareness among Selangor people of the dangers of cigarettes and vapes, especially among young people? So that is about public health.
Next, still on page 198, PK7: Youth Generation and Sports, Object Code 07003, Sports Development. I ask the State Government to consider increasing the allocation or financial resources for sports development. RM8 million is not enough if we want to achieve the targets for SUKMA and develop grassroots sports. Here I would like to propose that local authorities (PBT) and state subsidiaries be required to adopt sports designated as foster sports, with permission. For example, during SUKMA 2022, the Subang Jaya City Council became the foster parent of the Selangor rugby squad, and because of the very good support, both the men's and women's teams managed to reach the final, which has not happened for a long time, with permission, and won a silver medal. I think such an arrangement should be continued, where PBT can help sports teams, perhaps in terms of bus transport when going to matches, facilities and perhaps accommodation, and GLCs should be required to help financially. Fourth, on the environment and climate change, referring to page 239 P13 Drainage and Irrigation Department (Jabatan Pengairan dan Saliran) PK5 Object Code 05300, I would like to draw the House's attention to the issue of microplastics in rivers. Microplastics are plastic fragments that cannot be seen with the naked eye, within the nano size range. Some daily products such as toothpaste and shower gel, with permission, and industrial processes use microplastics, but the presence of microplastics in high concentrations raises new concerns. Univesiti Notthingham Malaysia conducted a water sample study in the Langat River, and among the team's findings was a very high concentration on the riverbed, of up to 150,000 pieces of microplastic per square metre of riverbed surface. Microplastics were found in almost every animal collected, including aquatic insects, clams and fish. Fish were the most contaminated animals in the study, where microplastics were found in the gills, intestines and flesh of the fish. There is growing evidence that microplastics in high concentrations may cause health problems in the respiratory and digestive systems due to intestinal inflammation. Given that rivers are an important part of the ecosystem and the state's economy, I request that the State Government study this issue. Finally, I end the debate with a quote not from Game Of Throne but from Conquerer, with permission, the real one, from Genghis Khan of Mongolia. He said that, with permission, the light is still green..
Ringkaskan.
Conquering the world on horseback is easy; it is dismounting and governing that is hard, that is what Genghis Khan said. I see in the debate on development and so on, the opposition has many proposals towards spending.. spending.. spending, but governing is hard. Here I think the State Government has done its best in drafting the 2024 budget, so thank you, Kampung Tunku supports it.
Morib.
Thank you, Mr Speaker, I also get to speak. Many of the matters have already been mentioned by the Honourable Member for Sijangkang earlier, so I will only add a little. I now move to P12, page 219, Public Works Department (JKR) PK01401, concerning the installation of traffic lights in the Kuala Langat district. This morning, before I arrived, there was an accident at the junction in front of the big mosque in Kampung Kanchong Darat, which affected drivers there because they were rushing against time, so safety at traffic lights in the Kuala Langat district needs to be enhanced and reviewed, because this is not only in the Kuala Langat area, particularly in Morib, but across Selangor. When I look at the allocation given under PK1401, it is only 400 thousand. I feel that an increase is necessary and it should be reviewed and improved in terms of the addition of street lights and safety. Likewise for PK1402, Enhancing Road Safety Aspects in the Kuala Langat district, I also take the approach that it should be re-examined and improved, because workers are rushing against time in the morning and evening, and this safety aspect must be taken into account. Next, I take PK013, Drainage and Irrigation Department (JPS), page 237, construction of embankments and dykes, for which I feel the allocation is only 2 million ringgit for next year, 2024. In fact, this flood problem occurs when rivers, drains or gutters are not properly maintained. I understand that at JPS level they always provide the best service, but the problem is the expenditure just mentioned, so I hope it will be re-examined with an increase, and we examine the current situation and see what is done this year and next year, we must have a bigger budget. This flood and rain problem we cannot predict, although there are forecasts that we make, but in my view those forecasts must also be taken into consideration.
Next, I go to the same page, PK06202, planning and restoration of beaches and estuaries, and I see that an allocation of 1 million ringgit has also been given. I take the approach for the beaches of Morib and Klanang, where recently a storm occurred with waters exceeding 5 metres, and I feel this is not only this year but also in previous years, because we need breakwaters that..
we should give our full attention because when the water comes out it has damaged stalls, roads, and I know road damage usually begins with water, and if flooding occurs I feel the allocation at JKR will be reduced because we do not need to improve roads, since I feel it is the flooding that will damage the roads. Next, I will move on.. I will not say much, I will give the opportunity to my other colleagues because I am afraid it will be like last week. P14 at the Islamic Religious Department (Jabatan Agama Islam), I move to PK1011603 SRA Kota Kemuning, Sekolah Kafa Integrasi Taman Kemuning. I would like to touch on this school because it has been nearly a dozen years; last, in 2011, approval was obtained for the land acquisition at Lot 087, and letters were sent twice to the Office of the Y.A.B. Dato' Menteri Besar in October 2018 and also August 2019, and a copy of the letter was received from the Office of the Dato' Menteri Besar, but that copy contained a request to expedite the construction of Sekolah Rendah Agama Taman Kemuning, addressed to the Director of the Selangor Islamic Religious Department. So I found that the estimated expenditure in 2018 was only RM8 million, but when I look here it has increased to RM13 million, yet I do not see any allocation given for the year 2024. So I request that the Islamic Religious Department provide an allocation for this school, because too many children (students) are currently sharing at Sekolah Rendah Banting, and I hope the Islamic Religious Department will give full attention to the problem of the Sekolah Rendah Agama in Taman Kemuning. As for the rest, I think it has been explained by the Y.B. Sijangkang, because he is also the Member of Parliament for Kuala Langat. He also mentioned earlier the matters in the Morib and Kelanang areas, such as cattle and other things. So with that, I think that is all, Mr Chairman. Thank you.
Tuan Speaker.
Ijok.
Thank you, Mr Speaker. Mr Speaker, I wish to debate the Development Motion 2024 for Vote P01 (Office of the Menteri Besar and State Secretary), PK2 Rural Areas (page 197), amounting to RM147,950,000.
In view of the increasing population growth and the rapid development, such as the construction of housing projects, factories and industries in the Ijok surrounding area, especially in Pekan Ijok, which is one of the main and strategic routes from Kuala Lumpur to Kuala Selangor, namely Route FT54, and is also close to the entry and exit points of the LATAR Highway and the WCE Inter-Urban Route Highway, which connects the Port Klang to Taiping route and is expected to be fully completed by the end of 2024. Pekan Ijok has now become the focus of residents because of the various facilities available, such as petrol stations (that's normal), supermarkets, laundry shops and so on.
Therefore, Ijok requests the attention of the State Government to allocate funds to build a multi-purpose community hall for the residents of Kampung Ijok, where the land is already available, namely on Lot 432, land owned by the Selangor State Government. However, in Pekan Ijok there is only one police post, which needs attention to be repaired and upgraded. The nearest police station is at Bestari Jaya, which is more than 8 kilometres away and takes more than 13 minutes to reach. In view of the fact that Pekan Ijok does not have a police station, access to banking facilities is rather difficult for the residents around Ijok.
Therefore, Ijok hopes that the State Government and the Federal Government, which are in agreement and aligned in their agenda, can give attention to this matter in order to fulfil one of the main requirements for the opening of banking services. Indirectly, once this police post is upgraded (the police station is already there), it only needs to be upgraded, and this could curb the mat rempit problem and prevent crime.
Mr Speaker, I would like to move on to Vote P12 (Public Works Department), page 218, amounting to RM145,000,000. Mr Speaker, the main issue is that the stretch (this stretch) is still under the FT054 Upgrading Project Team, namely the JKR Malaysia Headquarters. It has not yet been formally handed over to the Kuala Selangor District Public Works Department (JKR Daerah) for maintenance. Because the road has not been handed over to the District JKR, the District JKR cannot carry out maintenance for the problems that arise. The problems that arise on Jalan FT54 are usually unscheduled grass cutting that causes overgrown bushes, and poorly managed maintenance of drains and ditches that causes flooding on both sides of Jalan FT54.
However, I would like to thank the Kuala Selangor District JKR, which has taken the initiative to resolve the complaints of the Ijok residents, although it is not quite perfect. My question is, is there any effort by the State Government to expedite the handover process from JKR Malaysia to the District JKR? Accordingly, Ijok hopes that the State Government can press JKR Malaysia to expedite the handover process of Jalan FT054 to the Kuala Selangor District JKR so that maintenance work can be carried out properly.
Mr Speaker, there is a need to raise the level of roads that are at risk of being submerged when floods hit. For example, Jalan Parit Mahang and Jalan Robinson, which are often submerged when heavy rain occurs and cause road closures. It is recommended that these roads be given attention
and allocation for upgrading so as to prevent them from being submerged during heavy rain.
Next, I refer to code PK101701 (page 220). Ijok also hopes for the need to increase the number of street lights, especially at the main junctions, where it is highly recommended to install solar street lights to prevent theft and vandalism as opposed to installing conventional street lights. Among the main roads that need attention for street light installation are Jalan Sungai Darah, Jalan Rantau Panjang to Fruits Valley Jalan Bestari Jaya, Jalan Parit Mahang and Jalan Merbau Kampung Bukit Cerakah, Kampung Jaya Setia, Kampung Bukit Badong and the whole of Kampung Ijok. These lights are important for the safety of Ijok residents and for traffic or road users, to prevent accidents at night. Usually, in Ijok, as in other places, the issue is cattle wandering and resting in the middle of the road.
Mr Speaker, I move on to Vote P13 PK1 (Drainage and Irrigation Department), page 230, which involves an allocation of RM65 million for flood mitigation project development. Mr Speaker, Ijok has also not been spared from flood problems in Kampung Ijok, Kampung Parit Mahang, Taman Desa Mahang, which originate from the Sungai Buloh. Kampung Rantau Panjang, Bestari Jaya and the surrounding areas originate from the Sungai Selangor. Among the factors causing this problem are the problem of drainage maintenance and problematic culvert crossings of ditches, heavy rainfall in the local area which is also the upstream area of the river in other districts, and overflow of the river in low-lying areas.
Mr Speaker, the Kuala Selangor JPS has placed three mobile pumps at the lock gate, operational since 2021, and two semi-permanent pump units at the end of Jalan Abdul Aziz, Kampung Ijok, near the Sungai Buloh embankment, which became fully operational in early 2023. Unfortunately, recently (on 29.10.2023) the pump house housing these two semi-permanent pumps was broken into and important components were stolen, so that the pumps could not function. These two pump units were a great hope for residents to prevent worse flooding. The areas that are usually affected by this river are Batu 7 Kampung Ijok, Batu 7 Ladang Kampung Ijok, Batu 8 Kampung Ijok, Kampung Baru Ijok, Batu 28 Kampung Harmoni, and Batu 4 Ladang Kampung Bukit Badong.
Mr Speaker, since it is now the end of the year (rainy season), the residents and people of Ijok place great hope in the Selangor State Government to help provide urgent allocation to repair these pumps. Ijok also greatly hopes that the flood mitigation project along this Sungai Buloh can be completed as soon as possible, and that the staffing of supporting public posts is increased
to look after the lock gate and the four pump units of the Sungai Buloh RTB Phase 1, which are about to be completed and can ensure regular monitoring of the operation of the lock gate and pumps.
Mr Speaker, Ijok has learned of the JPS plan to tackle the flood problem in the Sungai Buloh Basin through the Flood Mitigation Plan (RTB). The Sungai Buloh RTB Phase 1 is currently being implemented to solve the flooding in the lower basin, involving part of Ijok and Jeram. The proposed extension is the Sungai Buloh RTB Phase 2, which has been submitted to the Federal Government to solve the remaining part in the upper basin area of Ijok and Jeram. The Selangor State Government is requested to convey the wishes of the people, especially in Ijok, Sungai Buloh, Paya Jaras and Jeram, to the Federal Government to approve the proposal for Sungai Buloh RTB Phase 2, because it can solve (it is reported that it can solve) these floods affecting the DUN of Petaling and Gombak District. Ijok is confident that the areas in Ijok and Petaling District can be reduced or saved from worse flooding. Finally,
Ijok doesn't have a monkey problem?
Lots of monkeys. If I were to describe it, the monkeys are very numerous.
That was before, right? Now it's all settled. Okay, good.
There are still many monkey issues now, but they have been debated a lot. I also hope that the State Government and the Local Authority, and the relevant departments, can resolve
I was thinking of bringing a shotgun to the ADUN (State Assemblyman).
These monkeys. Yes?
Yes, never mind, never mind.
Let me close this debate, Mr Speaker, with a pantun.
Lotus flower atop the shelf, Falls upon the berangan fruit, Should I have spoken amiss, Ijok begs forgiveness only.
Thank you.
Tuan Speaker.
Lembah Jaya.
Thank you, Mr Speaker. I would like to refer to PK3 (Entrepreneurs), page 197, which I also hope will further reduce the unemployment rate, with an allocation totalling more than RM31 million. I obtained the actual information and picture through statistics from the labour force survey issued by the Department of Statistics Malaysia (DOSM), which stated that in the first quarter of this year, the unemployment rate in Selangor State decreased and was very well controlled at 2.6%. In 2020 our unemployment rate rose from 4% to 4.3%; this was the time we faced the pandemic, and in 2021 the rate in Selangor State was higher, namely 4.5% in the first quarter and 4.4% in the second quarter. I like to mention that the rate that recorded a decrease in Lembah Jaya took lessons, and we always ensure that our citizens do not have problems finding jobs and that the workforce in Lembah Jaya has retirement savings through the KWSP, with permission, Kumpulan Wang Simpanan Pekerja, and is also protected by SOCSO. So I ask, what preparations have we all made regarding this matter? Mr Speaker, I would also like to refer to P.K 8 with Code 08001 Caring Government. I would like to ask whether it is related to our previous programme, Selangor Job Fair, and we hope this expo will be bigger, and we hope that, now that we have moved freely beyond COVID-19, we can open up job opportunities as widely as possible to the people of Selangor State in particular. The question is what is the effectiveness of going down to the districts, especially in Lembah Jaya. I would like to refer to P.K code 101003 related to the Smart Selangor Initiative. I would like to ask whether the State Government will continue the Smart Selangor Programme until 2025, and whether it will continue under the same name or be given a new name related to and in line with Rancangan Selangor 1. I would like to commend the allocation of more than RM760,000,000.00 for P.K 6 code 6001, 6002 and 6003, and I would like to ask once again whether the women, welfare and public health programmes will involve my constituency of Lembah Jaya. Insyaallah, the answer is yes, and I hope it brings good news to the people, or residents, in my constituency.
I would also like to touch on P.K 9 Treasury as a whole, whether it can be linked to foreign nationals or not. Mr Speaker, I hope the Selangor State Government, through the Local Authority, especially MPAJ or Ampang Jaya Municipal Council, will continue to be concerned about the problem of land misuse by foreign nationals, especially within the administrative area of the MPAJ local authority, such as Lembah Jaya. The Council is certain that it is carrying out monitoring and enforcement actions in Lembah Jaya and its surroundings, but nevertheless
there are foreign hawkers who resume trading despite frequent raids, because firstly there is demand from the local people and groups of foreign nationals for daily necessities such as grocery goods and, sometimes, liquor; secondly, the overflow of foreign workers in the industries here may also be a factor; and thirdly, the limitation on the powers of the PBT, which do not have the power to arrest foreign nationals. So the Council is burdened to curb this problem to ensure the comfort of the residents, especially in Lembah Jaya. I hope we can see what can be done by Undang-undang Kecil 3 in the hawker licensing provisions, UUK3 Trade and Industry Licensing, and also UUK3 (1) PEM Arak. I hope the PMAJ will have new strategies to implement enforcement actions and also operate in an integrated manner with the involvement of the District and Land Office, PDRM or the Royal Malaysia Police, Pengurusan Air Selangor and Tenaga Nasional, including internal units such as the Building Department, the Environmental Services Department, the Engineering Department, the Licensing Department and also the Market and Hawker Department. This includes the action of issuing notices under Section 72(1) and Section 22(6) of the Akta Jalan, Parit dan Bangunan 1974 Akta 133 to vacate and demolish buildings built without approval, with a compliance period of 30 days. I also hope we involve even more Federal Agencies such as the Immigration Department, although there may be limits; due to the shortage of manpower, the immigration department cannot take part in most of the operations carried out. In this regard, we can see the seriousness of the PBT such as MPAJ in taking action against any building structure built without approval. Lembah Jaya hopes that these problems can be overcome, and I, as a State Assemblyman, fully give my full cooperation in ensuring the smooth running and cleanliness of this area from the flood of foreign migrants who bring problems. Lajak perahu ke Sungai Tua, ambil dayung mudik ke tepi, terima kasih berucap kali kedua, semoga manfaat kita kecapi, sekian, terima kasih Mr Speaker.
Speaker.
Gombak Setia.
Thank you, Speaker, for the opportunity given to Gombak Setia to participate in debating the Development Expenditure Estimates 2024. I think this is not a committee-stage debate, so I need not mention the figures and details, and I would like to begin my debate this afternoon with the Smart Selangor initiative, where I feel that as a developed State.
Honourable Member, I remind you that your time is 15 minutes, even though you did not mention it. Honourable Member, just briefly. Even though you did not mention it, you must relate it to the details.
The Smart Selangor Initiative.
That is there, but don't forget not to stray from it. Yes, I know.
The Smart Selangor initiative, where I feel that as a developed State we certainly want to move further towards the mainstream. There is a lot of work we must do to provide infrastructure and facilities, especially in making the State of Selangor a Smartstate. Therefore, I would like to refer to the status of the audit case on the operating funds of Selangor Information Technology & Digital Economy Corporation (SIDEC), where I understand that the audit findings on the operating funds of SIDEC have been classified as a case of misconduct (silap laku) and not a case of wrongdoing (salah laku), since SIDEC used funds without following the standards set by INVEST Selangor. Therefore, I would like to emphasise that this is among the consequences of financial constraints at the MBI level, when we have too many subsidiaries with overlapping roles. That is why, in our eagerness to advance as a developed State, I feel that the State Government should have a mechanism to control our subsidiaries so that they do not compete with one another. Because in the end this will not lead to healthy competition without productivity, since they have the same overlapping functions, and among the subsidiaries with the same overlapping roles as SIDEC is SSDU. I believe SSDU too, as a result of this unhealthy competition, will in the end produce productivity that cannot make an impact on the State. For example, one of the programmes or internet initiatives carried out by SmartSel, which is a subsidiary of SSDU, the Setnet internet initiative that intended to provide internet to Government agencies, has not run until today and, in the end, it has caused this subsidiary to have debts to vendors, and I have been informed that the debt to those vendors is up to RM8 million, which in my view is unhealthy to have in the State of Selangor. Mr Speaker, I would like to continue my debate on the Sihat Selangor Programme and the health topic, where I understand that the Iltizam Sihat Selangor Programme has had its allocation reduced from RM45 million to RM35 million. I heard the answer from the EXCO for Health during the earlier question and answer session stating that RM10 million was reduced because this programme did not receive a good response.
Mr Speaker, I am puzzled how such an excellent programme as the Iltizam Sihat Selangor Programme did not receive a response from the people, when the target set today is only 100 for 100 thousand Selangor residents. This programme was previously named the Peduli Sihat Programme; it once reached 350 beneficiaries when it was implemented before, but this programme's allocation was reduced by RM10 million, and I was informed that the RM10 million was actually previously used for the Selangor Advisory Council initiative or
SELPHAC, which previously played a role when we faced COVID-19. Therefore, I would like to ask the Government whether SELPHAC still exists until today and from where the funds used to operate SELPHAC previously came. In my view, it is not a healthy matter if it is operated from funds that have already been allocated for us to implement the Iltizam Sihat Selangor Programme. Therefore, I still hope that the Government will strengthen this Sihat Selangor Programme, because in my own constituency of Gombak Setia, I believe many people are still waiting for the benefits of the Iltizam Sihat Selangor Programme, and we must strengthen it, and I suggest that its target be continuously increased beyond the 100 thousand beneficiaries that we have set today.
Next, Mr Speaker, I would like to raise the issue of development projects that are not progressing in the State of Selangor. Mr Speaker, there are several development efforts previously implemented by the Government, whether by the Federal Government or the State Government, that have been delayed due to many factors, among them land factors, and among them approval factors from the local authority (PBT) and so on. Therefore, I would like to draw the attention of the House to the problem that occurred at Masjid Al-Ittifaqiah, Taman Seri Gombak, where this mosque has already received approval from the Federal Government to develop the mosque at a value of approximately RM5 million. However, the problem with this mosque is that at the approval stage, the local authority (PBT) applied or the PBT required that its development must include the construction of a retaining wall or a development to ensure the slope can be resolved. Therefore, when the cost is calculated, this mosque requires an additional allocation of approximately RM5 million solely to build the retaining wall. Therefore, I humbly request the State Government, especially the Most Honourable Dato Menteri Besar, to give serious attention to this issue, because the approval that was granted more than 2 years ago by the Federal Government, if we do not benefit from it now, the amount or cost of this development is increasing day by day. So the cost is increasing day by day; today RM5 million is not enough, and in future it will not be enough, more than that amount, because today its development has been delayed due to insufficient funds to build the retaining wall, whereas the mosque has already been demolished today. So we do not want to give a negative perception to the people, especially the Malays and Muslims, where a mosque has been demolished but will not be rebuilt because there are not sufficient funds in our State.
Mr Speaker, another matter I would like to raise concerns the Halal Industry. The Halal Industry that we develop through many State Government programmes, including empowering our small entrepreneurs in the SME and IKS sectors and so on. Today many of our entrepreneurs are very creative and very innovative in developing their products, including
food products. But today, among the problems faced by our SMEs or IKS, especially in rural areas, is when they want to upgrade their status or level from IKS to a higher level, because they cannot or are not eligible to obtain a halal certificate. This is because they have cost constraints in owning business premises, whereas they prepare many of their products from home. This is among the matters that our State should give attention to, because certainly the halal industry today has a very large market, and I am confident that if we can resolve this halal issue, many of our entrepreneurs, especially those among them who prepare food products, can be upgraded in status and dignity so that they can compete not only in the domestic market but also in overseas markets.
Next, in our efforts to upgrade sports infrastructure. I, in Gombak Setia, am among the areas with a population that I would consider an aging population. This aging population needs suitable recreational areas. Therefore, I propose to the State Government, especially at the PBT level and also the EXCO, to look at providing good facilities in addition to providing sports infrastructure and upgrading sports infrastructure for young people, while the aging population or the senior citizens also need suitable recreational places, and therefore I see many lands that we can make use of, especially squeezed lands and several areas suitable for them to exercise and bring their families along, so that we can also build a healthy society not only today but also in the times to come. Regarding PBT basic facilities, I would like to draw the attention of the House today to our PBTs' eagerness to privatise public halls. This is among the problems in the Gombak Setia area, because the population and density of Gombak Setia is so high. Voters alone today already number 90,0000. Therefore, we have a high population or density, but we have less
Honourable Member, mind your time.
Kemudahan dewan.
Jaga masa.
I am about to finish. Public hall facilities. Our problem before was that these halls were managed by the PBT. We could use them for wedding receptions and so on. But today, when they have been privatised to private operators, then whereas previously we might pay the PBT RM500.00, today they have to pay RM5,000.00 to obtain or use these halls. Because previously they were public halls, now they have been upgraded as wedding halls and so on. And another problem is that when these halls are privatised, public halls can no longer be used for sports activities. Previously they could be used for badminton, previously they could be used for various school activities. Now, when they have become wedding halls, they can only be used for receptions or similar events. Therefore, this demands that we give serious attention, because our facilities are limited, but in the end, when we privatise them, it imposes a high cost on the public to use them.
Finally, Mr Speaker, concerning the issue of the Department of Irrigation and Drainage (JPS). I request the attention of the State Government regarding the Gombak River, which today is becoming shallower and shallower due to the development of the ECRL project in the Gombak Setia area. Today, I see that the ECRL project contractor is recklessly channelling their development area, the hills that have been cut are all being directed straight into the Gombak River, causing the Gombak River to experience the problem of becoming shallower and shallower. Therefore, recently I raised in the debate how important the matter of enforcement and approval by our departments is, because I was informed that this ECRL project still has not obtained approval from JPS to ensure that this project can also be coordinated with efforts to deepen the Gombak River. Today the Gombak River, which is increasingly shallow, causes the Gombak community, even though the rain is not heavy, to be worried because flooding can occur at any time. Therefore, I request the State Government to also look at issues like this, because we are now approaching the end of the year. At the end of this year, rain frequently occurs, floods also frequently occur, and that is why I demand that the State Government give attention to the issue of deepening the Gombak River, because it has caused flooding several times. Within just these few months, I think it has happened almost five or six times, so much so that Sabak, the Honourable Sabak, even said that if today he just mentions floods, people will think of Gombak. Because development projects that are not properly coordinated eventually cause our rivers to become shallower..
Masa.
And it causes natural disasters to occur. Thank you, Mr Speaker.
Thank you. Sentosa.
Thank you, Honourable Member, Mr Speaker. Sentosa is taking part in the last eight minutes. I would like to refer to eight matters. One is regarding PK.3, 03 Object Code 03003. Regarding the Entrepreneur Programme, I would like to ask the Government about the ICID programme. Will the ICID programme be continued in 2024? And next, regarding PK.9, 09003 Urban Development. We are well aware that the Smart Selangor Bus has been much debated last week and this week. I would like to propose to the Honourable EXCO, Sekinchan, who is excellent in bringing new projects and also regarding tourism. Can the Smart Selangor Bus be used by the local community every week, on weekends, where the Selangor Bus can be used to bring the local community to visit areas in, I mean, to increase tourism and so on, because I have observed that the Smart Selangor Bus is not much used on Saturdays and Sundays. Perhaps the community can use it or rent it at an even lower rate to help. Apart from that, Sentosa also wishes to propose PK.4, namely 04001 in terms of social matters, page 197. We are well aware that when COVID emerged we faced many problems, many people passed away and so on. And we are also aware that there are insufficient crematoriums, to the extent that we had to wait more than two weeks for cremation and so on. Perhaps we can ask each PBT across the entire State of Selangor to run a programme or provide funds to build a crematorium in each PBT, or the State Government can help the PBTs that cannot build crematoriums so that they can immediately or in 2024 or 2025, they have to start building the crematorium, with permission. On the same page, page 197, 04007 Object Code Non-Islamic Affairs. I thank the State Government for channelling allocation assistance of RM6 million every year to temples and shrines. I propose that the provision of this contribution, if possible, should be discussed with the State Assemblymen (ADUN) of the constituencies, because the ADUN of the constituency is more attentive to the temples or shrines that run programmes in their respective areas. Perhaps the ADUN of the constituency can play a role in approving allocations to the relevant EXCO.
Next, Honourable Speaker, PK.1, page 219, Object Code 01301 Installation of Traffic Lights. We are indeed aware that from the KESAS Highway to Kg. Jawa, there are many plans from the Central Government to build and connect a highway or four-lane road, but until now it is still not in the planning stage. I propose to the State Government or the Public Works Department (JKR) to help resolve the problem at the JJ roundabout, namely if possible to install traffic lights, because accidents often occur where there are no lights, and there is also a congestion issue where people cannot get out of the roundabout for hours. I hope the government or the Public Works Department (JKR) can help with the allocation provided. Apart from that, I would also like to request the Public Works Department (JKR) to repair the traffic lights at the
Perusahaan Jalan Sungai Jati area, where there are many container lorries. This is an industrial area, and many container lorries park along the sides of the road along Jalan Sungai Jati, and we need to help resolve the problem at that junction. I have already asked the Public Works Department (JKR). They are waiting for fund allocation. Perhaps with the allocation available in 2024, it may be possible to resolve this problem.
Honourable Mr Speaker, PK.2, 02000 Department of Irrigation and Drainage (JPS). Earlier, before that, I would like to thank JPS and also MPK, the Klang Municipal Council (MPK), for helping to resolve the problem of flooding in Taman Sentosa. For the past 10 years, we have faced many problems, especially flooding in the housing estates across Taman Sentosa, because water from Taman Sentosa could not flow to the retention pond and then to Sungai Aur. I was informed there is no allocation for 2024 to build and upgrade drainage, but there is an allocation to upgrade the flood retention pond at Sungai Aur. I thank the State Government because this is quite important. Next to me is Pandamaran. Pandamaran often causes flooding and therefore Sentosa also floods. But with, the cause of the flooding remains. But with the allocation to upgrade the retention pond, flooding at Sungai Aur near the water gate at Pandamaran, Pandamaran and Sentosa can be safe from floods. I wish to emphasise that, thanks to the authorities, so far Sentosa has not flooded again. Perhaps Sentosa is aware that many people still throw rubbish into the drains and ditches. Therefore, this also causes flash floods, but we also need to ensure that the area contractors regularly monitor, the MPK monitors, the KDEB monitors and play their roles to ensure the drainage areas are always clean, and we know that when it rains heavily, the drains must, I mean the drains must be clean so that water can be channelled directly to Sungai Aur. I request the goodwill of JPS to help resolve matters along the drainage from Taman Sentosa to Sungai Aur. Mr Speaker, I have about 40 seconds left. I take this opportunity to say that I agree with Gombak Setia. The PBTs should play a role in ensuring facilities are provided. Public halls, if possible, should not be privatised. This is important because we need halls provided for facilities. You have to be a service provider to ensure halls are built for the convenience of the community. PBTs should not rent out or privatise those halls. That is Sentosa's request. I would like to thank the Honourable Mr Speaker for giving Sentosa the space to take part in the debate. I, Sentosa, support. Thank you.
Honourable Members all, the time has now reached 4.30 in the afternoon. The House will resume at 10.00 in the morning tomorrow. The House is adjourned.
(THE HOUSE ADJOURNED AT 4.30 P.M.)