Selangor · 19 February 2025

15th Assembly, 3rd session, 1st meeting · 309 turns · 36,556 words · official PDF ↗ · Digital Hansard ↗

257 of 309 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.

(Opening)

Secretary of the HouseEN

Good morning and Salam Sejahtera. The order of business for the First Meeting of the Third Session of the Fifteenth Selangor State Legislative Assembly on 19 February 2025 begins with the recitation of prayer and the pledge of the Rukun Negara.

Assistant Secretary of the HouseEN

i) Recitation of prayer. (Prayer recited)

ii) Pledge

SpeakerEN

Salam Sejahtera and Welcome to the Most Honourable Dato' Menteri Besar, the Honourable Members of the EXCO, the Honourable Members of the State Assembly, government officers and all observers. Earlier we recited the pledge of the Rukun Negara, on the recommendation of the Ministry of Unity. I pray and hope that all Members of the House, whether present or absent, including all attendees, will appreciate and practise this pledge of the Rukun Negara to foster National Unity. Honourable Members, without wasting time, I invite the Secretary of the House to proceed with the order of business of this auspicious morning. The Secretary, please.

Meeting Papers

Secretary of the HouseEN

The next item on the order of business is the tabling of meeting papers.

1) Meeting Paper No. 1 of 2025 - Annual Report 2023 of Perbadanan Kemajuan Negeri Selangor (Selangor State Development Corporation)

2) Meeting Paper No. 2 of 2025 - Annual Report 2022 of Perbadanan Perpustakaan Awam Selangor (Selangor Public Library Corporation)

3) Meeting Paper No. 3 of 2025 - Report of the Special Select Committee on Water Management, Agriculture, Infrastructure and Mobility (JPK – INFRAGRO) on the Floods Issue in the State of Selangor

4) Meeting Paper No. 4 of 2025 - Report of the Special Select Committee On Competence, Accountability And Transparency - SELCAT for the Selangor State Legislative Assembly on the Implementation of the Selangor General Insurance Scheme (INSAN) Programme and Its Future Direction

5) Meeting Paper No. 5 of 2025

- Report of the Select Committee on Local Authorities (JP-PBT) for the Selangor State Legislative Assembly on the Enhancement of the Role of the Selangor Utility Corridor (KUSEL)

6) Meeting Paper No. 6 of 2025

- Feedback on the Report of the Select Committee on State Government Agencies, Statutory Bodies and Subsidiary Companies (JP-ABAS) for the Selangor State Legislative Assembly on the Future Direction of Smart Selangor Delivery Unit (SSDU)

The next item on the order of business is questions.

SpeakerEN

I invite the Honourable Member for Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable Mr Speaker, Pelabuhan Klang question number 1.

Oral Questions — 1. Issue of Illegal Land TransfersQuestions

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

1. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What steps are being taken to address the issue of illegal land transfers involving staff of the Klang Land and District Office?

b)

What actions will be carried out against all State Government agencies to ensure the integrity of public servants is at the highest level?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Mr Speaker. As-salamu alaykum Warahmatullahi Wabarakatuh and Salam Kita Selangor. Thank you, Pelabuhan Klang. I seek permission to answer this question together with several questions raised by Members of the House. The first is from Pelabuhan Klang itself, question 84; the second is from Meru, question 86; the third is the question from Sijangkang 215, and the third question, and the next is the question from Kuala Kubu Bharu, question number 356.

Honourable Members whom I hold in high regard, as so many Members have asked this question, this issue is certainly among the latest issues in the State of Selangor, involving several investigations carried out by enforcement authorities into land title transfers that have taken place, which have caused losses to the State and also to landowners. The Klang Land Administrator took immediate action by conducting an internal investigation to address the issue of illegal land transfers involving staff of the Klang Land and District Office. The results of the investigation were reported to the Police, and the Klang Land and District Office gave full cooperation and assistance to the Police to complete the investigation. The staff involved have been remanded and transferred to new departments pending trial. In addition, a Registrar's caveat has also been entered on the land titles under investigation to prevent any new transactions from being carried out. Control and monitoring measures continue from time to time to prevent the same incident from recurring. To ensure the integrity of public servants in all State Government agencies is at the highest level, the Government has held a comprehensive and integrated Organisational Anti-Corruption Plan (OACP) Update Workshop based on the working norms of State Government administration.

Second, strengthening the functions of the Governance Committee by directing all Heads of Department under the State Secretary's Administration to show a high commitment in implementing the governance strengthening movement as contained in Directive No. 1 of 2023 of the Most Honourable Prime Minister.

Third, carrying out surprise visits by Heads of Department at all Departments/Agencies under the State Secretary's Administration of Selangor to ensure the quality of service delivery is effective and carried out with integrity. Training and workshops on the 6 core integrity functions are held annually, involving heads of integrity units. Implementing integrated activities and programmes together with agencies such as SPRM or the Malaysian Anti-Corruption Commission (SPRM), or Suruhanjaya Pencegahan Rasuah. Next, holding briefings/talks, integrity workshops, circulation of announcements, and provision of information to administrative members.

For the Honourable Member's information, for officers appointed by the Federal Government, the procedures for work suspension and dismissal are under regulations 43, 44 and 45. Peraturan-peraturan Pegawai Am, Kelakuan Tatatertib 1993, for officers appointed by the Selangor State Government, the procedures for work suspension and dismissal are under regulations 44 and 45, Peraturan Pegawai Am Negeri Selangor 1995.

As for officers appointed by Local Authorities in the State of Selangor, the procedures for work suspension and dismissal are under regulations 53, 54 and 55. Kaedah Pegawai Pihak Berkuasa Tempatan, which may be imposed on the officers concerned. The State Government will take preventive measures to ensure this issue does not occur at the Land Office, the Local Authorities and other Government Departments, among them disciplinary action against the officers involved as subject to the above. Briefing programmes with the Malaysian Anti-Corruption Commission, integrity awareness programmes, and possibly or at the same time, the State/National Public Service Department (JPA) is implementing rotation or work rotation so that no officer remains in one place for too long and allows incidents we do not wish to happen.

Among the security measures, this refers to Meru, to ensure the e-Tanah system runs well. The first is physical security control through the use of closed-circuit cameras, biometric devices, tinted glass walls and the server data centre, as well as access at terminals restricted to the server administrator only. This means e-Tanah users, every user must place their biometrics before opening or carrying out transactions in the e-Tanah programme. Document security control, where registration transactions are digitally signed using tokens and encryption performed on documents, and storage methods via local storage, tape backup and replication to the Disaster Recovery Centre (DRC), this if it involves supply decisions and so on. Secondly, application security control through access restricted according to user role, using ID, password and biometric authentication. Fourthly, network security control using firewalls to control outgoing and incoming traffic to the e-Tanah System, and the use of Intrusion Prevention System (IPS) and Web Application Firewall (WAF) software to detect any threats to the e-Tanah System. The State Government takes such misuse seriously and will carry out monitoring of e-Tanah system activities, where all land registration transactions are automatically recorded in the e-Tanah system log to ensure every staff action can be traced and audited. Tiered access control is also implemented, where every Land Office staff member is given access based on their position level and the approval of documents at their level.

Thirdly, conducting work rotation. Fourthly, strengthening integrity by conducting briefings from time to time. At present, the staff concerned, as I have informed, are awaiting a full investigation by the Royal Malaysia Police, and the Malaysian Anti-Corruption Commission has also taken several necessary documents to ensure this incident does not recur. Likewise, my answer is, I think, not much different from the answer I should give to Sijangkang and also to Kuala Kubu Bharu regarding the related issue. Honourable Member, moreover, at the same time, in the recent Land Committee chaired by the Menteri Besar, we have directed that every land office carry out audits and inspections so that incidents like this do not recur, as they also tarnish the credibility of the administration and the image and confidence in land management in the State of Selangor. Although it happened in only one land office, I ask that all land offices check so that we can prevent this incident from recurring. If similar incidents did occur before, particularly when programmes or land management were carried out manually, when it was done manually before, there were some data inconsistencies, which were then used as an opportunity to change the list of names or create overlapping names. That is why the State Government placed the caveat earlier, because there were several land cases where titles were changed to certain names, and there were also two titles; the second title also had transactions and sales. This complicated the situation, and the State Government had to pay high costs for litigation and also pay high compensation or damages, including the loss of development potential of the land used as replacement land. Thank you.

Speaker

Sijangkang.

Thank you, Mr Speaker. Although it is reported that only 94 hectares worth RM7.1 million occurred in the Klang district, I think what the Most Honourable Member just said is also realistic, as it happened before when the system used conventional methods. Only, I also want to see what the State Government may have considered as options for situations like this, where overlapping occurs and there are two titles. This also actually happened in Kuala Langat; I received information from several owners. To find a solution that has begun to be considered, the question of what is wrong is for the court to decide, but a solution for these owners, thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

The owners may make reports and applications to the State Government, and in the past year alone there were at least three, two or three very similar cases, which the government then resolved. This included the process of replacing land with other land for those involved. Secondly, it also involved paying compensation amounting to quite a high sum, or fairly high compensation. That is why this loss is borne, or those who are affected besides the landowners, is the State Government itself, because we have to incur high costs to handle matters like these. However, what happened in this incident in Klang involved a transition process, namely when we transitioned from the manual system to the e-Tanah system. Certainly, when that system was implemented, there was data entry, or input of data, into the new system we introduced. At that time, there was a gap that was exploited by some irresponsible people. And as in my statement to the media, it was not a one-person job. It had linkages, it had networks with several departments and agencies, and even with institutions outside, to complete that process. We are now reviewing what shortcomings or similar errors may have occurred in earlier transition processes, so that we can avoid the risks of overlapping development and unclear land ownership, which have bad effects on owners and also on the State Government. Thank you.

Soalan tambahan.

Speaker

Kota Damansara.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Thank you to the Most Honourable Member for Sungai Tua. I myself once did a 6-month practical training at the Land Office in the Legal Division. This case is actually not the first time it has happened. There were cases of 2 titles in different names. However, is the State Government prepared in terms of compensation? Because if we look back, the amount that was brought on record was nearly RM50 million, and eventually it was negotiated and reduced to RM12 million. However, is the State Government prepared to take action against those who have been considered a cartel? First. Second, how much is the State Government willing to set aside? Because if we know, when it comes to land in Selangor, the value of the land is even higher compared to the money we have. So this—I want to ask the State Government whether it is prepared to identify the land to be exchanged and the compensation money to be paid as compensation if this matter is lost in court. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Member for Kota Damansara. It is not only individuals; I once led a State Government subsidiary company, and the subsidiary's land also had overlapping names. That happened in Kuala Langat or in Dengkil one time; I recall, Sijangkang knows about this. So what happened is actually quite widespread before. It was caused by the charting back then. The charting was not done electronically. It was done manually, that is, verification of names, and at that time usually there were people who entered other names and so on. As for compensation or valuation, of course the State Government did not prepare the costs beforehand. We look at it case by case, because although I said there were many, it is not that it is widespread or happening every day. What I mentioned, we found there were two or three cases in the last term. Last year, forgive me. But this year, what has emerged involves a large amount, with a value of RM7 million and so on. So we handle it case by case, but the State Government's main priority is to try to resolve it first. The second step is to find replacement land with the agreement of all parties. And third, the replacement, and also thirdly, if it involves transactions. This is more serious, which is why the caveat was placed early, because if a transaction occurs, the developer wants to develop, and they have already submitted KM, and only then is the problem identified, and it will have worse effects, or greater compensation or replacement valuation. That is why I believe this is a clear robbery which affects State Government revenue and also the potential for the public, revenue for personal interests, which we can partly address with the e-Tanah system. Because with this system we can control usage and who approves it and so on. Some of those involved had already passed away by the time we detected it. Some may have retired, but what we can do is make a Police report, and the Police will carry out an investigation. If the officer is still there, we transfer them elsewhere, or at least we impose some restrictions, with suspension regulations and so on, if it is found or clearly established that an offence was committed. And after that, let the Authority or the relevant authorities take follow-up steps such as prosecution and so on. Thank you.

Soalan tambahan.

Speaker

Batu Tiga.

Mr Speaker, with reference to the action we have taken. We transferred the officers to certain departments. I would like to ask how many officers have so far been identified as involved and have been transferred. Secondly, is there any external entity involved, for example lawyers or external agencies that were also involved in this situation, against whom we have also taken action or whom we have identified? So, I would like to ask how many officers there are and whether there are other entities involved as well. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

All those who have been investigated, or whose cases are under investigation, and action will be taken. All those involved, I am not sure of the number, perhaps more than 5 or 6 people. And as stated by the Authority and as the investigation I have been informed of shows, it is not only at that office. He had dealings with a law firm. This law firm is among those involved in land matters, for example. They are also involved, and of course those involved are people from outside the normal system. Normally they are the ones who handle land matters from SO right up to CADO. But this time, those involved are people within the system, because it is people within the system who can make changes at certain times. And we will take action. But so far there is the law firm and officers from the office concerned, and these are the last we have been able to identify. What we can do is take action within our system, namely against the officers at the office concerned, with the actions provided in the procedures for implementing punishment or action under articles 44, 45 and 46 that I mentioned earlier, as governed by the National and State Public Service Management. Thank you.

Tuan Yew Jia HaurDAP · PHTeratai

Soalan Tambahan.

Speaker

Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Speaker. Question Number 2.

Oral Questions — 2. Klia-Sepang Rail AlignmentQuestions

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

2. To ask the Right Honourable Dato' Menteri Besar:-

a)

What is the progress of the construction of the rail line from KLIA to Tanjung Sepat and Sungai Pelek as promised in the Kita Selangor 2023 manifesto?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, Question No. 2 from Bukit Gasing will be answered together with Question 108 from Balakong, Question 180 from Bukit Lanjan and also Question 365 from Rawang. Mr Speaker, the construction of the rail line from KLIA to Tanjung Sepat and Sungai Pelek is part of the alignment proposed in the Selangor Rail Alignment. For information, the Selangor State Government is in the process of carrying out a feasibility study. The Selangor Rail Alignment is intended to ensure that the proposed alignment is viable for implementation. The study is in its final phase, and among the study components are:

a) Study and challenges of existing traffic. b) Development of Modern Rail, whether we need to use standard gauge or metre gauge. c) Environmental and social impact study. d) Infrastructure engineering study. e) Concept of rail systems and operations. f) Financial and economic analysis and g) Financing model.

The State Government is studying the most suitable financing model, considering that the development, operation and maintenance of rail involve very high costs. The results of the feasibility study of the Selangor Rail Alignment will also be submitted to the Ministry of Transport to obtain feedback from the Federal Government on the proposal, as the construction of railway alignments falls under the jurisdiction of the Federal Government. Referring to the Land Public Transport Act 2010, Act 715, subsection 83(2). The Selangor Rail Alignment is a proposed railway alignment that will connect North Selangor to South Selangor, traversing Sabak Bernam, Shah Alam, Klang and Sepang, up to Labu in Negeri Sembilan, and will improve the rail ecosystem in the state of Selangor. To date, the study carried out has identified a main alignment of 200 kilometres with 4 supporting alignments or spur lines, namely West Port Klang, Putra Heights and UNISEL Bestari Jaya. This study considers both passenger and cargo services, which will

reduce travel time for users from the northern and southern areas of Selangor to focal areas at a speed of 160 kilometres per hour. For example, users are estimated to take 1 hour 42 minutes from Sabak Bernam to KLIA using the Selangor Rail compared with 2 hours 41 minutes if driving on the road. So the time saving is 1 hour. If this proposal receives approval from the Federal Government and the State Government can finalise a suitable financing model, the estimated construction period for the Selangor Rail Alignment is 10 years, carried out in phases involving various stages. These include initial design and public display. Application for a conditional railway scheme to the Public Transport and Land Agency and related bodies. Public inspection and identification of feedback, preparation of detailed design and preparation for tender implementation, land acquisition and land hearing process. The construction phase and system integration, as well as testing and commissioning. For information, engagement sessions have been carried out by the State Government with the Ministry of Transport to obtain feedback and input from the ministry regarding this Selangor Rail Alignment proposal. The development of the Selangor Rail Alignment is expected to have a positive impact on Selangor, including in terms of economic spillover to the state, taking into account connectivity with major logistics hubs such as Port Klang, Kuala Lumpur International Airport and Sultan Abdul Aziz Shah Airport. The development of the alignment is expected to help integrate the local economy with the larger metropolitan area, increase trade, industrial and business development and access to markets. North Selangor, for example, has a large production of agricultural produce and can benefit from logistics or transport through rail services that can reduce transport costs and improve market access. Likewise, the Southern Selangor corridor, which is a focal location for industrial development, and the proposed alignment will connect local areas with KLIA. The development of the Rail Alignment will bring great benefits through better transport connectivity with existing public transport and other rail transport services such as the MRT, LRT, KTM Komuter and KLIA Express. This will in turn improve the efficiency of passenger transport, as well as boost the Rail Industry by creating employment opportunities and developing talent and skills. Thank you.

Soalan tambahan.

Speaker

Ya Sijangkang.

Thank you, Speaker. Although this is one of the Kita Selangor 2023 Manifesto items mentioned earlier by the Honourable EXCO Member, which is now undergoing a feasibility study. However, I would like additional information: is this alignment also a free bus route in the Sepang district, and if so, what is the usage rate of public transport there, which may be one of the justifications for the feasibility of the KLIA Sepang, Tanjung Sepat and also Sungai Pelek alignment.

Tuan Ng Sze HanDAP · PHKinraraEN

Is the Honourable Member for Sijangkang asking about the Free Bus?

Ya.

Tuan Ng Sze HanDAP · PHKinraraEN

After the implementation of Rel Kita Selangor, will the Free Bus be implemented in the Sijangkang area? Is that the question?

No. My question now is whether there is a Free Bus service from this alignment. If there is, what is the usage rate of the public service?

Tuan Ng Sze HanDAP · PHKinraraEN

Some areas may have bus services that will pass through the areas along the Selangor Rail Alignment. But that is not a problem, because after this alignment is completed, we will reorganise all bus routes so that feeder buses and so on can be combined, and we can integrate all modes of public transport in order to provide a better and more efficient service to residents of the area.

My question is whether the alignment from KLIA to Sepang currently has a Free Bus service there. And if so, what is the usage rate of this Free Bus service among the public there. If there is no answer, a written reply is also fine, Honourable EXCO Member.

Tuan Ng Sze HanDAP · PHKinraraEN

No. In Sepang District, under the Sepang Municipal Council, there are indeed several routes that go as far as Sungai Pelek and Bagan Lalang and so on. So, if there is a need, we will add to them, or if there are overlapping routes we can reorganise them. So, that is not a problem, and I do not see why we cannot rearrange them if necessary. Thank you.

Speaker

Meru.

Thank you, Mr Speaker. My question is Number 3.

Oral Questions — 3. Food Security in SelangorQuestions

3. To ask the Right Honourable Dato' Menteri Besar:-

a)

What is the contingency plan to address a food crisis or natural disaster that could disrupt food supply in Selangor?

b)

How is the food distribution system planned to reach interior areas and marginalised communities?

c)

How is smart agriculture applied to increase food productivity in Selangor?

Dato’ Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Bismillahirrahmanirrahim. Assalamualaikum Warahmatullahi Wabarakatuh, greetings to all. Thank you to the Honourable Member for Meru and Mr Speaker. I will answer the question from Meru together with the question from Selat Klang, Question 90, part (a). Meru asked about the issue of food security in the State of Selangor. For the information of the Honourable Member, the Food and Agriculture Organization (FAO) has defined food security (food security) or keterjaminan makanan as a situation in which every person has access to sufficient safe and nutritious food to meet their needs. This access must be available at all times and meet their dietary needs and preferences. The FAO has also identified four dimensions of food security, namely: i) Availability (Availabiliy) The total amount of food available nationally

ii) Accessibility (Accesibility). This also includes affordability (purchasing power) The ability of households to access food

iii) Utilisation (Utilization) The way individuals use the food they have access to

iv) Stability (Stability) How stable the food supply is from time to time.

Based on these needs, the Selangor State Government has established the Selangor Agro Transformation Plan Policy, or PeTA, to plan and subsequently implement programmes and projects closely related to the issue of food security. This began in 2021 and runs until 2025. And this emphasises issues relating to:

1. High-Value Agriculture; 2. Agricultural Modernisation; 3. Complete Food Supply Chain; 4. Agropreneur Development; and 5. Agro Tourism.

Various programmes and activities have been carried out over these five years to meet this objective, namely to achieve the targets of PeTA, the Selangor Agro Transformation Plan, namely to increase production output or SSR (Self Sufficiency Ratio) for food or Agro Tourism in the State of Selangor to a higher level, and secondly to raise the income level of our farming community. Among the programmes under PeTA implemented to achieve the food security goal, we look at the entire chain from upstream to downstream programmes, namely from land use to nursery and seed development, production, storage and also marketing. These are the five important components of agriculture or agro food. Besides that, the State Government has also opened agricultural areas and increased output in existing areas, including the launch of the Smart Agro Park and Agro Farm programmes, as well as in Kg. Johan Setia, to enhance production within the Permanent Food Production Park (TKPM) managed by departments under the Department of Agriculture, the Department of Veterinary Services and the Department of Fisheries, all covering 22 areas with an area of more than 2,000 hectares. We also have the Selangor Agricultural Development Corporation (PKPS), which has an area of more than 1,500 hectares, including at Selangor Fruit Valley and other agricultural areas in Hulu Selangor and also in Kuala Langat. And, as an example only, I can give one example, in Kg. Johan Setia, which is well known for growing vegetable supplies. Nearly 30% of supply in the Klang Valley comes from this area, producing more than 3,000 metric tonnes a year with a value of RM46.3 million. In addition, we also have many more TKPM vegetable supplies, including the larger one in Ulu Yam and also in Cyberjaya, which meet most of the vegetable supply needs in Selangor and also in the Klang Valley.

Next, in an effort to also place emphasis on seed and nursery development, we have seen several efforts implemented under the Selangor Agro Transformation Plan, including the production of quality, disease-resistant crop seeds by GWG, which we have undertaken and launched, such as melon, maize and papaya seeds. A coconut seedling production site, which is a very much needed seed, and SGG is also being developed at Selangor Agro Park or Smart Agro Park in Sungai Air Tawar and also in Hulu Selangor, to produce quality coconut seeds for replanting our coconuts, mainly in Sabak Bernam. At the same time, we have collaborated with Global Good Waste to develop seed production for white shrimp and tiger prawns. This is one more aspect, and the latest, which we are in the process of breeding Black Belly Barbados. This is a very high-quality goat breed that is also disease-resistant and will be implemented this year. And, on the part of MARDI, in collaboration with MARDI we are also looking at new paddy varieties being implemented, including MR326 and MR331, which were announced in November 2024. We are also studying several other paddy seeds that are drought-resistant and high-yielding, namely NMR 151, NMR 152 and also UKM RC 2 and also UKM RC 8, which are also suitable for dealing with changing weather.

Besides that, the State Government also looks at the aspect of accessibility for the people. Therefore, it has increased the Jelajah Ehsan Rakyat programme. This is actually part of the Food Security programme implemented by PKPS. In 2025, the JER programme is expected to be implemented at 1,344 locations in 56 State Constituencies. In 2024, the number of locations involved was 1,642, but involving 56 because these are areas that are all mobile, moving rather than fixed. But this year we have added several supermarkets that we have established together with PKPS in collaboration with Seri Ternak and also SSG. So, that is why it appears there is a decrease in terms of mobile locations. But overall there is actually an increase. And at the same time we also have collaboration with FAMA through Selangor Agro Market and also with Co Hijrah for the implementation of caring sales. This will further improve accessibility for the people of Selangor. Another important effort we are undertaking is the contingency plan for addressing food crises, where we have implemented the Selangor Food Warehouse Programme (GMS), where we store supplies to face any possibility of disaster or food shortage, mainly from carbohydrate sources (carbohydrates), namely rice, and from protein sources, namely frozen meat, fish and chicken. This has been started at a rate of 15% first of the total requirement of the Selangor population, which we estimate at 7.2 million, meaning 15% first for a period of one month, and we will increase this supply or food storage to 3 months for 7 million Selangor residents. This is an important effort in addressing the storm crisis just now, natural disasters such as floods, and at the same time to stabilise prices. If there is a disruption in food supply or insufficient supply, we will release stock to stabilise prices.

For the second part, relating to part (c), relating to the use of modern technology. This is one of the policies I mentioned earlier, because we are of the view that the State of Selangor should lead agricultural modernisation, because agricultural modernisation will be able to overcome the issue of land shortage to increase yields, and at the same time also face the issue of the weather changes that are happening now. Through Smart Agriculture (IOT), we have encouraged, through Smart Farming, whether fertigation/hydroponic cultivation as well as plant factories and vertical farming, and we have expanded these in the State of Selangor. And through this method, we can produce high yields from small areas. Smart Agriculture also involves the use of drones for fertilising, detecting pests and diseases, and I have given an example in this House before: we have started providing combine harvesters, the harvesting machines I mentioned earlier. If we use large harvesting machines in paddy fields, we will lose 20% which falls to the ground. But we have started providing assistance to Farmers' Organisations, with combine harvesters suitable for paddy, where the grain spilt onto the ground is only 3% to 5%. This can quickly help reduce paddy spilt to the ground. And we have started implementing, in Kalumpang, Integrated Pest Management (IPM), which introduces environmentally friendly methods for managing diseases among crops. These are among several other matters that we will pursue, and we will further strengthen their use and expansion. Thank you.

Soalan tambahan.

Speaker

Meru.

Regarding the Food Warehouse, Honourable EXCO Member, what are the methods and mechanisms for releasing food from the warehouse? Thank you.

Dato’ Ir. Izham bin HashimAMANAH · PHPandan IndahEN

The Selangor Food Warehouse (GMS) is a new step that is rarely taken. It certainly does not exist in our country. If there is anything at all, it is at BERNAS, which only stores rice. In some places, including at their production centres. And the nearest state, Singapore, practises stockpiling of this kind, and we do not have access because this is security, food security, which is somewhat confidential. So, we have to build our own method of managing this stockpile. And we must understand that every item we store has an expiry date. So, we cannot keep them there forever, and the system we are developing for now is temporary buildings, which we rent, and we will have expiry dates, and the system we will use is a computerised system, a computerized system, for how we manage the rotation or cycle of these items so that they are released and sold through the JER programme and so on, but replaced. That is to say, anytime we say we want 5,000 tonnes, there will always be 5,000 tonnes of rice. And if we release 1,000 tonnes, we replace them, and we will audit every three months, we will audit to ensure these items are there. This process must run according to the items we store. For items with a three-month expiry, we must release and sell them within three months and replace them. We will build this, and the permanent centre is also in planning. For this year we will begin, which requires an area of about 10 acres, actually, for our food storage warehouse building. Thank you.

Tuan Mohd Shafie Bin NgahPAS · PNSungai Ramal

Tuan Speaker.

SpeakerEN

I am going to Sungai Ramal.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Thank you, Mr Speaker, and thank you to the EXCO, who have shown sincerity in safeguarding food security in Selangor, which includes, among other things, padi and rice, with at least 5 tonnes always kept in a protected amount. My question is, I went to Sekinchan, my village. I often meet villagers who ask, they say Sekinchan will have a new town approved by the Sabak Bernam Municipal Council. If this new town that is to be implemented materialises, what is the effect on the decline in the total output of padi in Sekinchan? Because it is rumoured that the new town will destroy padi areas. If it happens, if this new town really happens, what is the percentage effect of the reduction in padi production? Added to this is the existence of a tourism sector there. Big aeroplanes parked nearby, bird's nest houses. Combining all of these, what is the actual effect on the rate of reduction of padi in Selangor, specifically in Sekinchan? Thank you.

Dato’ Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Sungai Ramal. I do admit that among all types of agriculture that we undertake, the most challenging is padi. Because it is a mono crop, a single crop. This is not easy for us to manage. We have around 19,000 hectares, and in our last census we found that 2,000 hectares have been lost due to planting activities that are not related to padi. What's it called, some have planted vegetables, some have done what's it called, homestays, some have done aeroplanes. So, there are many things, and in fact, under the land management method for agricultural land, we allow 2/5, we allow them to develop buildings. That is indeed provided for in the regulations on the use of agricultural land. But I am of the view like this, if we look at the trend of our padi, I see progress. We have once reached around 8 tonnes. We have even reached 10 tonnes. And there is also one factual error. Some mentioned only the Sekinchan area. Actually, it is not only the Sekinchan area that is high. In the surrounding area, Sungai Burong is also high, actually. But they only mentioned Sekinchan, fine, let us accept Sekinchan. But actually, in the surrounding area, I observe that when we divide it into 6 padi mukims, 6 or 7 mukims including Kuala Selangor, yes. We find that in the surrounding area, 2 to 3 others are indeed high in yield. But when a decline occurs due to disease and so on, then a decline is visible, and I am more inclined to re-examine this padi area of 19 hectares and identify exactly the areas we can use. This study is being carried out, yes, precisely which are fertile and suitable for us to retain, but we improve their yield, their output. That is far better. That is the proposal, because until now we have never conducted that study. The reason why, now I see that if they have been losing money all year round, they will not want to plant padi anymore. They no longer have the capacity. So they plant vegetables, and vegetables seem to give higher yields than. But we must be balanced, because padi is our staple food and is important. So we cannot arbitrarily make a decision that we want to change it. That is not so simple, but we will examine and re-study, and most importantly, I and also the Federal Government are looking for ways to increase that yield from the current 4 to 4.5 tonnes, which is very low. Cambodia, a state that uses ordinary fertiliser, can even get up to 10 tonnes per hectare. We can increase it to 8 tonnes, and in this way we will be able to increase the output of padi or rice in the North-West area. Thank you.

Supplementary question, Mr Speaker. May I?

Speaker

Ya Sijangkang.

Thank you. The Johan Setia area is among the sources of 30% of vegetables in this state of Selangor, which I observe are mostly cultivated by foreign workers, there is privately owned land and there is land that is encroached upon, and under the electricity transmission lines, yes. Which I think, with the development of the LRT Station, is not sustainable in the long term. Could it be that the State Government has considered certain areas to be developed, or permanent food production sites, this can also be developed to accommodate this 30% source in the long term. And what is the status of the Selangor Food Warehouse, which I think in the previous answer was at the stage of RFP (Request For Proposal), which I think, if 3 years, what preparations do we have for the intervention that has been carried out by the State Government, which is very good, yes, but from the perspective of our food stock, have we started it from now. Thank you.

Dato’ Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Sijangkang. For the information of the Honourable Members, actually in this State of Selangor, or the supply for the Klang Valley, for vegetables. Actually, the largest is at TKPM, Hulu Yam. That is the first. The second is at TKPM here, in the Smart Agro Farm area in Johan Setia. The third is in Cyberjaya. Now, for our information, this State Government is so serious about safeguarding this supply, that recently, when there was an application from our own subsidiary to change the conditions of Hulu Yam so that it could build other development buildings, we did not allow it. We did, because we want to keep that area as an agricultural area. So we told them to look for another area. Because in, I think, if I am not mistaken, around 400 hectares, this area we have indeed kept as a TKPM area as well.

This is to safeguard the supply of vegetables and so on. PNSB, our subsidiary. But we had to, even though they felt there was a possibility to use it for development and gain more profit, but we are of the view that under food security, food assurance must be maintained, and Johan Setia is indeed a major issue for us because this area is a peat area, and until now we have not allowed development. How many times has it gone to the SPC (State Planning Committee), I myself had to disagree because to develop this area is 20 to 30 metres deep, peat soil can cause problems for development, even though we allowed a little for the LRT, if I am not mistaken, the LRT Station which we allowed, and also the highway route. But for large-scale development, we did not allow it. Because it is a peat area and is also a major vegetable farming area, the second largest, and I know this place has problems, I once called in these lands, the tanah kurnia, many with 2 acres, 2 acres. The landowners did not even know where their land was. So foreigners came in, planted, but even though they are foreign workers who came in and planted, the vegetable yield is very large, and we are working to regularise this place and it will need some time because to find and identify the owners is not easy in the Johan Setia area, and in Cyberjaya it is the same, the areas under the transmission lines and so on, those are not their areas, but they are also the third largest producers of vegetables in this State of Selangor. We will examine, and see how we can, if that area we consider suitable and can be given for the short term for them to continue planting vegetables, especially under the Tenaga Nasional lines, vegetables are among the crops permitted to be planted under the Tenaga Nasional lines, yes, we will look at that carefully, yes. Thank you.

SpeakerEN

Yes, Hulu Kelang. No, Dusun Tua.

Dato’ Ir. Izham bin HashimAMANAH · PHPandan IndahEN

The food warehouse, wait a moment, yes, let me add a little. The food warehouse I mentioned earlier, we have already started a warehouse for rice, meat, chicken and also fish. This we have already started as I mentioned. Earlier, our target was 15% first. A requirement for one month, and once we have a place, but this warehouse, we have already set one up for rice at Tanjung Karang. We have already determined and begun storing, and we have begun auditing, but we will increase it. This is temporary, a temporary building, but we have an agreement to rent that place, and we cannot mix it with other rice that is under ownership. But our permanent building, this year we will begin construction, as I mentioned, of 10 acres in area, yes. Thank you.

SpeakerEN

Alright, Dusun Tua.

Datuk Wira Johan Bin Abd AzizUMNO · BNDusun TuaEN

Thank you, Mr Speaker, my question is number 4.

Oral Questions — 4. Strata-Titled Residences/ Multi-Storey HousesQuestions

Datuk Wira Johan Bin Abd AzizUMNO · BNDusun TuaEN

4. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What is the action of the Building Commissioner (COB) against the JMB/MC that fails to manage the collection of maintenance fees?

b)

There are many basic facilities such as roads, playgrounds, rubbish bins/refuse houses that are not well maintained, what action will be taken by the relevant parties?

Datuk Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Mr Speaker, thank you, Honourable Dusun Tua. The question from the Honourable Dusun Tua concerns the action of the Building Commissioner (COB) against the Joint Management Body (JMB) or Management Committee (MC) that fails to manage the collection of maintenance money. a) For the information of the Honourable Member, among the actions that can be taken by the Building Commissioner (COB) against a JMB or MC that fails to manage the collection of maintenance fees are as follows:

i. Conducting field sessions to provide advisory services and mediation to the JMB and MC and parcel owners on the importance of paying maintenance fees.

ii. Advising the JMB to submit the names of owners or parcels that fail to pay maintenance fees to the Strata Management Tribunal for further action under the Strata Management Act 2013, which is Act 757. The COB also assists the JMB in issuing notices to parcel owners who fail to settle outstanding maintenance fees.

iii. And subsequently, providing automatic reminder notices to parcel owners who fail or are late in paying maintenance fees through the e-COB system.

Apart from that, the Government also gives its views to the Ministry of Housing and Local Government (KPKT) that it should take into account issues related to the maintenance of low-cost housing, namely in the process of drafting amendments to Act 757, to ensure more sustainable and effective strata management for the future. I was visited by the consultants appointed by the KPKT last month, where they are currently conducting a study. A study on the effectiveness of the COB or JMB in relation to Act 757. So it has become a focus in the State of Selangor because Selangor has many of these low-cost housing residences, and the study is being carried out to improve and ensure that Act 757 appears more open, otherwise this Act involves Low-Cost and Medium-Cost Housing, which causes constraints for the State Government as well as the local authorities (PBT).

For the information of the Honourable Member, maintenance of basic facilities in strata residences is under the responsibility of the JMB, and the management body must ensure that basic facilities are always in good condition by conducting scheduled maintenance and resolving complaints of damage from residents. This means that the failure to collect earlier causes them to be unable to carry out maintenance and so on. So, we at LPHS, the Selangor Housing and Property Board (LPHS), also assist the JMB in terms of advisory services, guidance, training and also the Management Enhancement Course, which we conduct every year, where our target is that JMBs that fail to come under C-SMART increase awareness and understanding of how to address the problems of these residences or strata housing. Apart from that, we, the State Government under LPHS, also provide assistance under the Skim Ceria, helping with lift repairs, repainting and also maintenance related to problems in low-cost housing. Thank you, Honourable Member.

Soalan tambahan.

SpeakerEN

Yes, Dusun Tua.

Tuan Ong Chun WeiDAP · PHBalakong

Soalan tambahan.

Datuk Wira Johan Bin Abd AzizUMNO · BNDusun TuaEN

Thank you, Speaker. Earlier the Honourable EXCO mentioned that in Selangor, low-cost housing is plentiful. We do know that. Recently there have been many issues such as rubbish houses at these flats that are not well managed. Many of these rubbish houses, I think, are too old and the rubbish bins have not been replaced. So, what is a drastic measure, because the issue of rubbish is very extensive, I, two days ago, for example, Taman Orkid in Dusun Tua, there were entrepreneurs who took the opportunity to dump rubbish. So perhaps the JMB and its management cannot control the arrival of lorries from outside. Very many, very high. So I see this issue is prolonged and persistent. So what are the State Government's steps to overcome the problem of rubbish houses and also the maintenance of these flats.

Datuk Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Honourable Member. For improvement initiatives such as rubbish houses, yes, playgrounds, roads and so on, coordinated planning needs to be carried out. Cooperation from all Local Committees, Housing Committees, Community and Planners. These initiatives need to be carried out according to the current rate from time to time because this problem is a very poor management problem, management where sometimes there are also JMC or JMB where they keep swapping, not even one term yet and all have resigned. So this disrupts the management.

So this matter, the COB takes several actions, that we hold meetings with the community, organise gotong-royong programmes, area cleaning and so on. This also ensures that because of them, we also try to provide a little budget, yes, to help the JMB bodies carry out their responsibilities. As I mentioned earlier, among the Skim Ceria, we also carry out repairs and gotong-royong and also monitoring of all complaints that are carried out. Because the COB has its limitations, its powers lie with the federal government. So, although it is placed in the local authority, its powers are under the KPKT. Thank you.

Tuan Ong Chun WeiDAP · PHBalakong

Soalan tambahan.

Speaker

Subang Jaya.

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Thank you, Mr Speaker. Supplementary question. Subang Jaya wishes to ask whether the State Government is prepared to consider whether we as the Government can take over the management of low-cost flats. Now there is the Skim Ceria, its weakness is that once the funds have been disbursed, we make no effort to recover them. But if we have an agency, where they are responsible for implementing projects like the Skim Ceria, but they are also an agency like management. Then we have an effort to recover the money and that fund will become greater, and at the same time we can resolve the maintenance problems in low-cost flats. The Honourable EXCO's view.

Datuk Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Honourable Member. I mentioned it earlier, Act 757 has constraints, yes, because it is under the KPKT. However, as I mentioned earlier, last month we were visited by the consultants appointed by the KPKT to conduct a study. What are the requirements and policies that need to be improved in this Act. So we have proposed that this Act be opened up so that local authorities and the State Government can provide cooperation and assistance. So this matter is indeed under study, and I am confident and believe it will be raised in the upcoming sitting of the House for debate, and this Act will be given improvements for implementation. Thank you.

Tuan Ong Chun WeiDAP · PHBalakong

Soalan tambahan.

Speaker

Ya. Balakong.

Tuan Ong Chun WeiDAP · PHBalakongEN

Honourable Member, we welcome the Skim Ceria initiative. However, can the State Government also consider expanding the scope of work? For example, roads in these apartment areas, because at present the categories that can be applied for do not include roads. Okay.

Datuk Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Honourable Member. It can be considered, provided we have a fairly adequate allocation, because our allocation situation is rather limited. So we take the more important items, such as lifts, water tank supply, and the necessary areas that involve more important public interests. I understand that roads also have a degree of importance and this can be studied, and God willing we will try to consider it. Thank you.

Speaker

Hulu Kelang.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Question number 5.

Oral Questions — 5. Economic Benefits from Malaysia's Role as ASEAN ChairmanshipQuestions

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

5. To ask the Right Honourable Dato' Menteri Besar:-

a)

What steps will the Selangor State Government take to benefit from Malaysia's role as ASEAN Chair 2025 in the context of attracting investment and trade, and strengthening Selangor's position as a regional economic hub?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Hulu Kelang, for the question raised, which relates to the role or steps of the State Government in Malaysia's Chairmanship of ASEAN in 2025, and the economic benefits and investment opportunities created, as well as the steps that we implement. So I will also take this question together with question number 91 from Rawang, question 126 by the Honourable Member for Meru, and question 297 from the Honourable Member for Bukit Lanjan, because they refer to the same matter. Honourable Members, this year is the year Malaysia serves as ASEAN Chair, the first time since Malaysia last chaired in 2015. With a concept that Malaysia's ASEAN Chairmanship seeks to put forward, namely, with permission, inclusivity and diversity, with emphasis on the approach of centrality rather than neutrality as stressed by the Right Honourable Prime Minister, these elements will be important attractions for ASEAN countries, including Malaysia and Selangor, in attracting international investment. Among the steps we will implement to take advantage of this economic opportunity is by launching the Visit Selangor Year 2025. In the Visit Selangor Year 2025, we will take advantage of the more than hundreds of meetings held throughout Malaysia and some of them in the State of Selangor, among them the AIPA meeting, the ASEAN Inter-Parliamentary Assembly, whose dinner and programme will be held in the State of Selangor. This is an opportunity for us to promote tourism or tourist centres in the State of Selangor, which at the same time will produce good economic effects and impact.

In addition, we have also obtained cooperation from the relevant ministry, for example MITI, to include the Selangor International Business Summit as part of the agenda contained in the programmes under ASEAN. As our slogan before this, SIBS as a Gateway to ASEAN, and this time it becomes one of the important doors for us to promote business, industry, industrial parks. In the last 2 years, we have promoted industrial parks as part of the elements contained in the Selangor International Business Summit, in addition to the conference on smart cities and several other matters, and I believe that, as ASEAN Chair, we will succeed in organising a bigger programme, with the attendance of the Prime Minister, and it will also be held again at KLCC, or the Kuala Lumpur Convention Centre. And this time we will also invite several outside figures, including governors from countries around ASEAN. This is an opportunity for us to close the gap between the countries concerned, because one of the things we have noticed is the lack of trade, with permission, among ASEAN countries compared with ASEAN countries' trade with Europe, America, or China and India. So this is value creation that we create among ASEAN countries so that trade among these ASEAN countries can be streamlined and further strengthened.

The third point is through the implementation of the Selangor Airshow programme. Sorry, correction, SIBS will be held, God willing, in October 2025. The Selangor Airshow was previously an event that was held openly. Not open, meaning in the field. But this year, 2025, the Selangor Airshow will focus on industries and enterprises related to the aerospace system, or aircraft industry, in the State of Selangor. So it is not only an aircraft show or types of aircraft, but we will do it in the hall, in-house or inside the hall, exhibitions inside the hall, and exhibitions of this kind will show all companies or those involved in this industry, including MRO, and also including the provision of systems and service support related to the aerospace industry in the State of Selangor.

Thirdly, we are also increasing promotions. Perhaps some of the gentlemen and ladies have seen me and the EXCO members appearing in media coverage, such as at KLIA or at airports, at international airports, to introduce Selangor and Selangor's attractions, apart from the industries that can be exploited more widely in the State of Selangor.

The third point, the fourth point is by enlarging and promoting several aspects or several of our initiatives, especially programmes such as Speed Selangor, which we will launch in the second quarter of 2025, or in May and June this year. And this programme and Speed Selangor will bring benefits by speeding up land processes and approvals, and this becomes new attractions for businesses in the State of Selangor that we can implement at one of the hundreds of meetings held. There are 800 meetings, 325 of which involve meetings between the Minister and the Chief Minister, and the rest are meetings involving officers, and we will try to include some of these attractions and exhibitions in those meetings. Thank you.

Speaker

Hulu Kelang.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Thank you, Dato' Menteri Besar. I believe that we in this House agree that Selangor can be given leverage on our strengths, its strategic location and our strengths, to attract high-quality investments to the State of Selangor. Apart from the initiatives or plans that have been outlined by Dato' Menteri Besar, such as the Visit Selangor Year, SIBS, and the Selangor Airshow, I think we must accept the fact that Selangor is still among the particular states in the peninsula that are experiencing a trade deficit when compared with Johor, Sarawak and Penang. So I would like to ask Dato' Menteri Besar: at this time, ASEAN countries are actively working to increase integration in supply chains, and Selangor's position is very strategic for optimising our role. So my question is, how can we use Selangor as an E&E hub, for example, to increase integration among ASEAN countries, and also how can we capitalise on Selangor's strengths to promote sustainable and also green manufacturing practices, or green manufacturing practices, in line with the ASEAN sustainability goals. So I request an explanation from the State Government. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Member. Certainly, if we look at our track record or the data that has been shown, 2024 shows that Selangor and all the states of Malaysia have succeeded in improving the value of our trade, both in terms of exports and imports. Only in the State of Selangor, imports are higher than exports. This means that from a simple perspective, or from a simple framework, we find that Selangor is the main entry point compared with goods that go out, although that amount is higher when we compare it with other countries. So the matter mentioned as a trade deficit by the Honourable Member a moment ago has been much improved, especially with the trade performance that has been recorded, including the total value of investment and the total value of trade, which has continued to increase, as has been reported by the Department of Statistics Malaysia (DOSM).

Second point, regarding the E&E industry, for example, Selangor has, rather actively in 2024, laid a high foundation in its IC design park and in semiconductors. And after this, how can we bring the flagship programme that we have discussed in Suzhou, in Shanghai, in Taiwan and several other countries? However, we must gauge the extent to which the imposition of tariffs, or the effects of tariffs by the Trump 2.0 administration, will have a direct or indirect impact on the companies concerned. Among them, AM, for example, will certainly go down here, and also several advanced packaging projects that we have brought in. We have identified the sites, but the cost is rather high, Honourable Member, because it involves costs at our level, almost 1 billion if we want to make that commitment, in addition to the value of the investment we bring in, and the network for advanced packaging in semiconductors will create a very large network. In our discussions with private companies, they have not yet been able to give a commitment, and we are discussing with GLCs, for example, which involve the Federal Government level, because if we succeed in providing these facilities for them to establish themselves, it is not only the advanced packaging companies that will establish themselves, because these companies do not only provide for companies in China, they also provide facilities or services for international companies in Europe and the United States. This entire network, we can impose conditions for them to be included or to come to the State of Selangor. And we have identified sites in Sepang, and another in Dengkil as those sites. So these are among the matters that we are actively implementing, and this network can be integrated with several networks in other countries, for example Vietnam. This is among our competitors in the semiconductor field, and we can complement each other in efforts to ensure that this E&E field or subsector can be greatly exploited. The second IC Design Park will, God willing, be completed in the first quarter of this year, and the first one is already full, and for the second one, I think before we open it, there is already a waiting list to enter. This front end or back end, this front-end IC design, whose importance is not, it is not only done here, because it will also give a rating that begins in Malaysia. It begins in Selangor, Made in Selangor. Its design for semiconductors or chips or equipment that will be produced begins with design, followed by advanced packaging and the next steps.

Regarding the green economy raised in the last point by the Honourable Member, certainly we will try to ensure the data centres that will establish themselves in the State of Selangor. If I recall my earlier report, there were roughly 28, for example. 28 data centres in the State of Selangor, the number has in fact increased to almost 35 or 36 today. We will set several ESG measures, among them the use of renewable energy and also sustainable water use, and in addition, programmes such as ZDP and programmes within the green economy framework will provide impacts and effects that are comparable and can be debated and discussed at SIBS as well as the programmes we implement. Thank you.

Soalan tambahan.

Speaker

Silakan.

Thank you. I think from the perspective of international trade, Malaysia's position is strategic, especially Selangor, where we have an airport and we have a port. However, from the perspective of Malaysia's role in the ASEAN Chairmanship, the opportunity we take to bring the Selangor international halal agenda, which I believe is an ecosystem that can still be planned well, even among ASEAN countries, Indonesia has its own Halal Indonesia, but Malaysia's position as a centre for trade with the Middle East, the West, and also China and Japan, I think this is among the good positions, and we can introduce its ecosystem even better, or perhaps through SIBS, round-table meetings and so on can be planned by the State Government. Seeking views.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Member. I, I strongly support, supporting the views and also the hopes of the Honourable Member that the halal industry can be developed. And indeed we have tried even before this to place halal, or the halal industry, as one of the important lifelines of an economy that can be developed, especially among the Muslim community in our country. But the reality we find is the awareness among entrepreneurs, between those who are Muslim and non-bumiputera, or those who are not Muslim. Among those who are not Muslim, their awareness is higher in registering and also in making the transition to halal certification. This is due in part to the viewpoint or way of thinking of the community, which has not been able to change the notion that halal, or the halal industry, is a economic sector that can be developed, and that certification does not depend on skin colour or religion, but on how the processing of goods or food is produced.

We implement this programme, MIHAS, for example, and also the Selangor halal programme, which we carry out every year and every year. However, how can we overcome the mind barrier, or the constraints of thinking among the community, including among traders and those who operate businesses? Malay enterprises in particular, and also those who are Muslim, sometimes feel it is not necessary to register for halal certification because they are confident that they already make halal products. Yet non-bumiputera companies appear to be more aggressive in registering for halal. This is among the combinations between law and business, which sometimes there are some who are extreme on the law, not extreme, they hold the view of law, indeed the ruling is halal, but its certification does not appear halal. That is why I think there needs to be a joint collaboration between Halal International Selangor and the relevant department, so that both these elements can be combined towards ensuring the production of products that are halal and guaranteed, and also do not raise sensitivities with ingredients that are syubhah, but are also able to offer to the market at the Middle East level and also across the world, where demand is still very high, especially for halal food, and not only for that, but also for other goods such as pharmaceuticals and cosmetics. So, I think the biggest thing is to release that mindset so that the mindset of law and business can come together towards the economic success of entrepreneurs and products, in addition to ensuring the supply of goods has a halal guarantee. Thank you.

Speaker

Paya Jaras.

Dato' Dr. Ab. Halim Bin TamuriPAS · PNPaya JarasEN

My question number 6.

ORAL QUESTIONS FROM THE HONOURABLE MEMBER DATO' DR. HALIM BIN TAMURI

TITLE: CONSTRUCTION OF MASJID KAMPUNG MELAYU SUNGAI BULOH

6. To ask the Right Honourable Dato' Menteri Besar:-

a) What is the current status of the planning for the construction of Masjid Kampung Melayu Sungai Buloh? b) When will the process of acquiring the nearby land be carried out? c) What is the estimated cost of this project and when is the project expected to commence?

Thank you, Mr Speaker, thank you, the Honourable Member for Paya Jaras. The question asked concerns the construction of Masjid Kampung Melayu Sungai Buloh. For part (a), the current status of the planning for Masjid Kampung Melayu Sungai Buloh is that it is still under consideration and assessment by JAIS, the Selangor Islamic Religious Department. On record, I wish to express a little empathy for this issue, because according to the review that has been done, this matter was raised as early as 2014, and certainly after nearly a decade has passed, the needs of these residents have surely become more pressing. So I request that this matter be expedited by the agency. The postponement of this issue is due to the access route, which has to involve the acquisition of privately owned land that has not yet been finalised, causing the efforts to construct the mosque to be delayed until now.

For part (b), the land acquisition process can only proceed after an assessment by the Department of Survey and Mapping Malaysia (JUPEM), and approval of compensation payment from the State Economic Planning Unit is obtained, and thereafter it will also be based on an assessment by JPPH.

And for part (c), the last one, regarding the estimated cost of this project, the cost of this project is estimated at RM 20 million for a mosque on a one-acre plot of land, but this does not include the total amount of compensation payable to the landowner. Thank you.

Soalan.

Speaker

Ya.

Dato' Dr. Ab. Halim Bin TamuriPAS · PNPaya JarasEN

Thank you, Honourable Member. Yes, well, thank you for the concern, because this is an old issue raised in Kampung Melayu Sungai Buloh. So I request, in the Honourable Member's estimate, when this project can roughly begin. That is to say, the villagers ask when, because it has actually been since 2014, or 2015, almost 11 years. In JAIS's estimate, when is this project expected to begin? At least they can prepare, because the population is increasing, and the surau is also getting more cramped. So this needs attention from all of us, to expedite the construction of the mosque. Thank you, Honourable Member.

Alright, thank you, Honourable Member. So far there is no fixed or determined timeline, because it is subject to the survey process by the Department of Survey and Mapping Malaysia (JUPEM) and also to the valuation of the land to be acquired, which will be approved according to the approval from JUPEM and also the State Government. I have already said on record earlier that I will propose that this matter be expedited, because in my opinion it has been delayed for a very long time. Thank you.

Speaker

Selat Kelang.

Datuk Abdul Rashid bin AsariBERSATU · PNSelat KlangEN

Thank you, Mr Speaker. My question is number 7.

ORAL QUESTIONS FROM THE HONOURABLE DATUK ABDUL RASHID BIN ASARI

TITLE: ILTIZAM SELANGOR SIHAT

7. To ask the Honourable Dato' Menteri Besar:-

a) What improvements have been and will be made to the Skim Peduli Sihat? b) Does the State Government intend to increase the amount given for the per-treatment usage limit (RM70) to help the people who are increasingly affected by rising medical costs?

Puan Jamaliah Bin JamaluddinDAP · PHBandar UtamaEN

Thank you, Mr Speaker, thank you, Honourable Member for Selat Kelang. Selat Kelang has asked what improvements have been and will be made to the Skim Peduli Sihat, or ISS, and the second question, whether the State Government intends to increase the amount given for the per-treatment usage limit, namely RM70, to help the people who are increasingly affected by rising medical costs.

Mr Speaker, among the improvements that have been and will be implemented by the Selangor State Government for the Iltizam Selangor Sihat programme, previously known as the Skim Peduli Sihat, in 2024 and 2025 are: since 2024 the State Government of Selangor has increased hospitalisation benefits, and this year we will continue with dialysis treatment. The introduction of hospitalisation benefits, or in-patient benefits, amounting to up to RM10,000 a year at private panel hospitals and selected government hospitals began last year, and a brief explanation of this benefit is that the hospitalisation benefit will be given to the principal holder, with permission, and applicants must obtain pre-treatment documents and referral letters first through several methods. The first is through the Selcare Panel Clinics and The KL Clinic. The second is Telemedicine Selcare through the SELangkah application or at any Health Clinic or Government Hospital.

So for 2025, the Selangor State Government is finalising the coordination of dialysis treatment benefits, which were previously placed under the Selangor Health Assistance Programme, or BSS, and this assistance will be placed under the ISS Programme. The coordination of these dialysis treatment benefits will help eligible dialysis beneficiaries receive treatment assistance of up to RM10,000, compared with RM5,000, which was the maximum amount that could be received under the BSS Programme. And at present, the Selangor State Government does not plan to increase the basic treatment assistance limit of RM70 per treatment session. However, for the purpose of controlling basic treatment prices by panel clinics, Selcare Management Sdn. Bhd. has coordinated this matter with the panel clinics through the agreement document between Selcare Management Sdn. Bhd. and the panel clinics to ensure that the treatment charges imposed are not too burdensome to the beneficiaries' finances. Thank you.

Datuk Abdul Rashid bin AsariBERSATU · PNSelat Klang

Soalan tambahan.

Tuan Dr. Quah Perng FeiDAP · PHBandar Baru Klang

Soalan tambahan.

SpeakerEN

Yes, Selat Kelang first.

Datuk Abdul Rashid bin AsariBERSATU · PNSelat KlangEN

Thank you, Honourable EXCO. What's the name, regarding the payment just now, the RM70, is the Government planning to increase that amount because of what happens out there, when these patients go to private clinics especially, they bring the card, RM70.00, but the clinic adds to the medical charge, sometimes up to RM120.00, RM150.00. So, recipients of this scheme feel angry and shocked. It's as if they are saying the assistance given by the Government is insufficient. So, that is why I am asking whether there is a proposal to increase this amount again.

And the second, for 2024, how many recipients of this scheme went to, received treatment, and how much has the Government spent for that purpose? Because in my view, since the reserves of the State of Selangor are quite substantial, amounting to more than RM4 billion, I feel it would be good for this addition to be increased to provide comfort to the people of Selangor. Thank you.

Puan Jamaliah Bin JamaluddinDAP · PHBandar UtamaEN

Thank you, Honourable Selat Kelang. As has already been explained earlier, although there is no increase in subsidy at the clinic treatment level, since last year the Selangor State Government, out of concern for the people of Selangor, has in fact established hospitalisation benefits, where if they really need more serious treatment, Selangor residents, especially the principal holder, the main holder, may undergo treatment at panel hospitals up to RM10,000. So I think that is an added benefit that shows genuine concern for the people of Selangor and also the commitment of the Selangor State Government in matters related to public health.

And also, if at any of the panel clinics that have collaborated with the State Government, we find that the charges imposed are excessive or not in line with market prices, the matter can be reported or complained to the State Government so that the next action can be taken, because from time to time we do monitor issues related to these treatment charges. Are there any other questions to ask? That's all.

SpeakerEN

Yes, Bandar Baru Klang.

Tuan Dr. Quah Perng FeiDAP · PHBandar Baru Klang

Soalan tambahan

SpeakerEN

Yes, Bandar Baru Klang.

Tuan Dr. Quah Perng FeiDAP · PHBandar Baru KlangEN

Thank you, Health EXCO. I would like to ask a little, indeed for one whole family, the treatment cost for one year is RM500. For single persons it is RM250, but given the increasingly high cost of treatment, would it be appropriate to raise it to RM1,000 or more?

Puan Jamaliah Bin JamaluddinDAP · PHBandar UtamaEN

Thank you, Honourable Member. I would like to add a little more, I have just remembered that among the questions asked, the number of recipients for the ISS programme is 67,276 so far. And also for the information of all Honourable Members who are concerned about assistance or benefits related to public health, in fact this year the Selangor State Government has allocated an estimated RM40 million for initiatives related to public health apart from ISS, although ISS is the programme with the largest allocation compared with the other allocations. And if we look at the amount allocated, Selangor can in fact be said to be the first state to allocate such a large amount compared with other states. This includes Sabah and Sarawak, whose budgets may actually be higher, especially Sarawak, which has a higher budget than the State of Selangor in overall total. So, the commitment of the Selangor State Government is that we indeed want to establish a certain percentage whereby nearly 5 per cent of public health expenditure or allocation has been included in the overall budget, the development budget. Therefore I think Negeri Selangor is indeed committed. However, perhaps what has been raised concerns the ways in which we want to help the people of Selangor, and that matter we can monitor from time to time. Because the Peduli Sihat programme since the year, perhaps 2018, 2019 until now, 2017 until now, its name has changed, but in fact the benefits under Peduli Sihat up to ISS have also changed according to current circumstances. So, if there are proposals for improvement, we can monitor them from time to time to ensure that the improvements are important or more significant for the people of Selangor.

SpeakerEN

Honourable Members all, the time has reached 11.30 a.m., and I hereby adjourn the question session for the next item of business.

Motion to Present Expression of Thanks and Gratitude for the Royal Address of His Royal Highness the Sultan of SelangorMotion

Secretary of the HouseEN

The next order of business: Motion of thanks and gratitude for the Royal Address of His Royal Highness the Sultan of Selangor.

SpeakerEN

I hereby invite the Honourable Member for Pelabuhan Klang as the Mover.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable Member, Mr Speaker, and all Honourable Members. Pelabuhan Klang seeks to move a Motion which reads as follows: Your Majesty, we, your subjects, namely Mr Speaker and Members of the Selangor State Legislative Assembly who have gathered in this august Assembly,

respectfully submit our humble thanks and gratitude for the Royal Address of His Royal Highness Tuanku at the Ceremonial First Sitting of the Third Meeting of the Fifteenth Selangor State Legislative Assembly 2025, on 18 February 2025, yesterday. I also wish to humbly express my highest gratitude to His Royal Highness the Sultan of Selangor for the Royal Address of His Majesty, which is full of wisdom, prudence and concern for the welfare of the people and the development of the State of Selangor. Indeed, Tuanku's Address will serve as a guide in charting the direction of the State of Selangor towards a more advanced, prosperous and well-being state. Pelabuhan Klang also wishes to record its congratulations to the State Government of Selangor, led by YAB Sungai Tua, on its success in achieving the highest revenue record in the history of the State of Selangor for 2024, amounting to RM2.867 billion. Meanwhile, the reserves of the Selangor State Government increased to RM4.131 billion in 2024 compared with RM3.614 billion in 2023, an increase of RM517 million. This achievement not only reflects the financial management efficiency of the State of Selangor but is also proof of the success of the progressive policies implemented for the welfare of the people of Selangor. This achievement proves that Selangor continues to be the most advanced state in Malaysia, with a strong and sustainable economic capacity. It also indirectly reflects investors' confidence in the stability of the administration of the State of Selangor and in inclusive and sustainable development initiatives. Honourable Mr Speaker and Members of the House, Selangor continues to grow as the most advanced and strategic state in Malaysia. It contributes more than 25% to the nation's Gross Domestic Product (KDNK). Rapid development in the services, tourism and trade sectors has attracted many residents to migrate and settle in the State of Selangor. The Department of Statistics Malaysia shows a significant increase in population from 6 million in 2015 to 7 million in 2021, with projections reaching 8 million within the next 5 to 10 years. Along with this increase, the Selangor State Government needs to act proactively in efforts to ensure that infrastructure development and basic facilities remain sustainable in line with the increasing needs of the people. To meet housing needs, the Selangor State Government needs to expand the Selangorku housing programme, to ensure that the people own comfortable affordable homes. This step is very important in curbing rising house prices and ensuring that low- and middle-income groups are not marginalised. In terms of infrastructure, improvements in road maintenance, drainage systems and traffic management also need to be strengthened by the Selangor State Government. Pelabukan Klang will fully support all government efforts to upgrade the road system to reduce traffic congestion, especially in the Pelabuhan Klang area and its surroundings.

Kita Selangor 1.0 and 2.0 Programmes, Honourable Mr Speaker, Selangor is not only the most advanced state in Malaysia but also a state that symbolises harmony and diverse unity. His Royal Highness Tuanku Sultan of Selangor, in the Royal Address, expressed support for the Kita Selangor 1.0 programme that has been implemented and the Kita Selangor 2.0 programme that is about to be launched. This programme has placed emphasis on the spirit of people's unity, resilience in facing challenges and readiness to make changes towards a better direction. His Majesty also decreed that this initiative will be aligned across the nine districts in the State of Selangor so that its benefits can be felt right down to the grassroots. At the same time, this ensures that the State of Selangor will continue to progress and remain competitive. This matter proves that the Selangor State Government does not only focus development in urban areas but also ensures that the welfare of the people across the state continues to receive attention. Pelabukan Klang welcomes this effort because it is in line with the vision of developing Selangor as an inclusive and progressive state. However, in this effort we must not allow external elements that exploit religion and play on racial sentiments to become obstacles to the unity of the people. In recent years we have seen how certain parties have tried to divide society by bringing narrow and dangerous narratives for the sake of the interests of those parties. Never let extremists and opportunists use religion and race as tools to incite the people and damage the harmony and unity that we have long built in the State of Selangor.

Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

This state proves that unity is the key to success, and therefore any effort to weaken the cohesion and solidarity of society must be firmly rejected. Through the Kita Selangor 2.0 programme, the Selangor State Government can expand initiatives that benefit the people, such as welfare assistance programmes, local economic development and activities that strengthen inter-racial unity. This approach is very important in ensuring that society is not marginalised from the rapidly progressing development taking place in the State of Selangor. Pelabukan Klang also wishes to emphasise that the main basis for the success of these programmes is the active participation of the people. Therefore, efforts must be made to ensure that every layer of society can understand and be directly involved in the initiatives introduced under the Kita Selangor 2.0 Programme.

Honourable Mr Speaker, this programme proves that the Selangor State Government always strives to develop the state with an inclusive and comprehensive approach. Let us not allow wicked elements that sow hatred between races and divide the people to become obstacles to the progress of the State of Selangor. Pelabuhan Klang is confident that the Kita Selangor programme will become a driver of unity, economic competitiveness and the welfare of the people across the State of Selangor.

Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

With orderly and effective implementation, this initiative will help Selangor achieve its goal as an advanced, competitive and prosperous state for all parties, without being influenced by narrow agendas that seek to damage our unity. Yes.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

Thank you, Pelabuhan Klang. I strongly agree with the arguments of Pelabukan Klang regarding, firstly, infrastructure. This infrastructure must be made uniform with our thinking, culture and manners. Does Pelabukan Klang agree that, for us to foster unity, maintain morals and avoid a culture of slander, it must first be started by the Honourable Members in this House? Do not let any of the Honourable Members in this House use social media to slander anyone and bring negative elements that divide unity. What is Pelabuhan Klang's view?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

That is why I state that we, as the people of the State of Selangor, who live in a diversity of cultures, races and religions, must reject elements such as these that may divide the racial unity we have built up until today.

Honourable Mr Speaker, Selangor continues to grow as a state that is the main hub of Malaysia's economic growth. With modern infrastructure, a quality workforce and investor-friendly policies, Selangor remains the preferred destination for strategic investment, including in the rapidly growing semiconductor industry. His Royal Highness Duli Yang Maha Mulia Tuanku Sultan Selangor, in His Royal Address, welcomed the efforts of the Selangor State Government to take steps towards strengthening the semiconductor industry, particularly with the success of Malaysia Semiconductor IC Design Park 1 in Puchong. His Royal Highness also expressed the hope that Phase 2 of the development of this park will open up more job opportunities for the people, especially young people, in the high-technology sector. Pelabuhan Klang also wishes to commend the initiative of the Selangor State Government in its efforts to strengthen Selangor's competitiveness as a technology and innovation hub, while at the same time ensuring that the state remains the first choice of investors.

Pelabuhan Klang also welcomes the government's efforts to improve the efficiency of administrative and business processes, including accelerating the time taken for investment and business approval processes.

His Royal Highness Duli Yang Maha Mulia Tuanku Sultan Selangor also commanded in His Royal Address regarding the success of the Selangor State Government in reducing the processing time for matters between investors and the Selangor state government and all local authorities, from 3.5 months to 14 days and 7 days. As a result of improvements in review and approval procedures, the efficiency and success of the Speed Selangor Policy have made Selangor increasingly competitive in terms of, with permission, Honourable Mr Speaker, ease of doing business, which is a key determining factor for foreign and domestic investors in making investment decisions in the State of Selangor. Pelabuhan Klang believes that with these proactive measures, many quality investments will come into the State of Selangor, thereby creating more job opportunities and improving the living standards of the people of the State of Selangor. The Selangor State Government needs to continue to enhance this initiative by expanding incentives for technology companies, strengthening cooperation with universities and skills training institutions, and ensuring that more young people in Selangor are trained in semiconductor and digital technology fields.

Honourable Mr Speaker, Pelabuhan Klang fully supports the efforts of the Selangor State Government in ensuring that Selangor remains the main destination for high-technology investment. Improved administrative efficiency and strategic direction in the semiconductor industry prove that Selangor is not only advanced in terms of infrastructure but also in ensuring the prosperity of the people through job opportunities with high income in the high-technology sector. Pelabukan Klang hopes that the Selangor State Government will continue to strengthen policies that support innovation and the growth of high-impact industries so that Selangor remains a leading state in Malaysia's economy.

Honourable Mr Speaker, environmental sustainability is a shared responsibility that must be shouldered by all parties, including the government, local authorities and the people of the State of Selangor. His Royal Highness Duli Yang Maha Mulia Tuanku Sultan Selangor, in His Royal Address, has emphasised that the Selangor State Government is responsible for safeguarding environmental sustainability by providing 100 recycling centres in major housing estates, in addition to all 12 Local Authorities (PBT). This step is very important in reducing the amount of waste that ends up at rubbish disposal sites and in building public awareness to shoulder the responsibility of protecting the environment together. Pelabuhan Klang welcomes this initiative as a continuing effort by the Selangor State Government to ensure that cleanliness and environmental sustainability are maintained. However, this effort needs to be

strengthened further by increasing the number of recycling centres and introducing initiatives for people who actively practise recycling. For example, incentives such as a PBT tax rebate or PBT assessment tax, or cash rewards, could attract more people to take part in this practice. In addition, firm enforcement actions need to be taken against irresponsible parties who engage in illegal rubbish dumping activities. Pelabuhan Klang views the problem of illegal rubbish dumping as an issue that requires serious attention because it not only affects the cleanliness of the town but also pollutes the environment. Therefore, firm action against those who irresponsibly dump rubbish illegally needs to be stepped up, including imposing heavier fines and more frequent monitoring by the relevant authorities. Pelabuhan Klang also wishes to propose that the Selangor State Government explore the use of green technology in solid waste management, such as organic composting systems for food waste and modern recycling plants. Many developers who have succeeded in reducing dependence on rubbish disposal sites by applying this technology, while also helping to generate alternative energy sources that are more sustainable, have been heard of.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Request the floor, Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Ya.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Thank you, Pelabuhan Klang. I am very interested when Pelabuhan Klang raises the issue of recycling in the State of Selangor. I previously served in Pulau Pinang. So in Pulau Pinang we have achieved the recycling target set by the state, and indeed in the Rancangan Selangor 1 it is stated that the State Government plans to achieve a recycling rate in this State of Selangor of 15.02%, but if we look at the report that was tabled earlier in the previous sitting, it has only reached 8%. Moreover, this target should have been completed by the first Rancangan Selangor in 2025. This year is 2025, right. So, does Honourable Pelabuhan Klang agree with me that the State Government has failed to achieve that target, and what is Honourable Pelabuhan Klang's view on what should be done, whether the EXCO should be changed or the Menteri Besar should be changed? These are Honourable Pelabuhan Klang's views that I want to hear.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable Taman Medan. This is a provocative question, Taman Medan. That is why, from the beginning of my speech, regarding what this is, I mentioned from the start that environmental protection, or these recycling programmes, is not only the responsibility of the government alone but is also the responsibility of all of us, the people of Malaysia. If only the government organises programmes but they do not receive a response from the people, or the people take these programmes lightly or disregard them, then it will not happen. That is why I suggested in my speech that we provide incentives to encourage more people to take part in efforts to run this recycling programme. I congratulate Penang on its achievement; God willing, Selangor will reach 15% soon, just as Penang has achieved. God willing. Honourable Mr Speaker, Pelabuhan Klang will fully support the Selangor State Government's efforts to strengthen solid waste management and promote recycling practices. However, this effort needs to be accelerated and implemented more comprehensively to ensure that Selangor becomes a model state in terms of cleanliness and environmental sustainability. Honourable Mr Speaker, Pelabuhan Klang would like to take this opportunity to extend many congratulations to the State Government of Selangor under the leadership of the Most Honourable Dato' Menteri Besar Sungai Tua, who is always proactive in ensuring that the welfare of the people is protected, especially in dealing with the cost of living. The efforts of the Selangor State Government in introducing the Jualan Ehsan Rahmah (JER) are clear evidence of concern for the people in helping them obtain basic goods such as rice, cooking oil, chicken, fish, eggs, vegetables and other goods at more affordable prices. His Royal Highness Duli Yang Maha Mulia Sultan Selangor, in His Royal Address, also stressed the importance of ensuring that the food security of the people of Selangor is guaranteed. Selangor, as the most advanced state in Malaysia, must ensure that its people are not burdened by the increase in the cost of living at the global level, which is becoming increasingly challenging. Therefore, the proactive step of the Selangor State Government through the Perbadanan Kemajuan Pertanian Selangor (PKPS), which has continued to organise the Jualan Ehsan Rahmah for the third year, is an initiative that is very appropriate to the command of His Royal Highness Duli Yang Maha Mulia Tuanku Sultan Selangor and is indeed a necessity for the people of Selangor. As we are well aware, through the Jualan Ehsan Rahmah Programme, more than 7 million people of Selangor have benefited from subsidies totalling RM12 million last year. Moreover, this programme is expected to travel to 1,344 locations throughout the State of Selangor in 2025, so that the people, especially the B40 and M40 groups, can enjoy goods at more affordable prices. This step shows the sincerity and commitment of the Selangor State Government in ensuring that every person in Selangor is not marginalised from enjoying effective economic assistance. The extraordinary response to the Jualan Ehsan Rahmah programme proves the effectiveness of the initiative introduced. Therefore, Pelabuhan Klang proposes that the Selangor State Government may kindly expand this Jualan Ehsan Rahmah programme further by increasing its frequency in every area of the State Assembly Constituency (Dewan Undangan Negeri).

At least once a week, especially in areas with low- and middle-income residents. This step.

Pelabuhan Klang, may I interrupt briefly?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Ya.

I have been listening to the debate on Jualan Ehsan Rahmah, and of course I myself support the efforts made by the State Government, which are very good. Yes, when we talk about Jualan Ehsan, we of course also talk about the number of participants who can take part or buy at any one time. So far, based on my observation and a rough count, around 300 to 400 people can buy at any one time. Whereas, if we go to crowded places, such as high-rise residential areas, flats and so on, the Jualan Ehsan will simply go down a few blocks and head straight to the Jualan Ehsan Rahmah site, which is certainly not enough. I would just like Pelabuhan Klang's view: can we propose to PKPS that, if they decide to go to areas densely populated with residents, they should bring more goods, rather than bringing the same quantity to terrace and flat areas? So, what is Pelabuhan Klang's view?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable Batu Tiga. That is why, in my earlier speech regarding this Jualan Ehsan Rahmah programme, I asked the Selangor State Government, through PKPS, to increase the quantity of goods and sales as well as the frequency in areas with high-income residents and in areas with low-income communities, the B40 and also the M40 groups, so that more people can enjoy goods at more affordable prices. That is why I ask the Selangor State Government, given that this Jualan Ehsan Rahmah programme has received an encouraging response from the people, and the people are always eagerly waiting and looking at the schedule of the areas where the Jualan Ehsan Rahmah programme will be implemented. That is why, if we look at the record, more than 7 million people of Selangor have benefited from subsidies totalling RM12 million in the previous year. That is why.

Honourable Member, may I interrupt.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

That is why I hope that the Selangor State Government, as proposed by Honourable Batu Tiga, will further increase the quantity of goods in certain areas so that, in addition to the 300 to 400 people in some areas, we may be able to increase the number to up to 500 people who can buy basic necessities such as rice, fish, vegetables and so on in certain areas. Yes, Honourable Member.

Thank you, Honourable Member. I actually want to agree with Batu Tiga just now. It is a very good view from Batu Tiga regarding a caring government, but I also want to ask the Honourable Member: we bring the said programme to places where the capacity is 300 to 400 people, in areas where there are 2,000 people who need that assistance. At the same time, the Kerajaan Prihatin is increasing the rate of taxes on the people, which covers all the people. So, what is our justification for bringing in an initiative worth RM11 million, while at the same time also increasing the burden on the people by imposing taxes equally on all Selangor people?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable Kuang, do you see which areas are being taxed, which areas have had their tax increased, and which areas should not be taxed? Not all areas are taxed, eh, all areas are taxed. Low-cost areas and village areas are not subject to this assessment tax at all, you know. These are areas where the tax applies only to high-income areas, areas with luxury homes, industrial areas and manufacturing areas. This one, Honourable, you can only look at. Honourable, do not just talk in this honourable House, because later you will be [...] with an explanation from the Honourable EXCO PBT, Sekinchan, regarding which areas are taxed and which areas are not. Indeed, there are areas in the Klang Royal City Council (MBDK) area whose assessment tax has been reduced too, based on appeals made by the applicants. So, to reduce the cost burden on people, that is why, with programmes such as Jualan Ehsan Rahmah, the Selangor State Government is concerned about the rising cost of goods. We all know that this rise in the cost of goods is not only happening at the national level in Malaysia but at the global level, and these economic challenges are not only in Malaysia but globally. However, the State Government has taken the initiative to be one of the first states to hold and establish the Jualan Ehsan Rahmah Programme, and we took that initiative, and this is the third year we have implemented it. Indeed, many states and the Federal Government have also copied the Jualan Ehsan Rahmah business concept implemented in Selangor. So this measure not only ensures that more people benefit, but also helps to stabilise the prices of basic necessities by offering more affordable prices. I see that traders in the areas where Jualan Ehsan Rahmah is usually concentrated also indirectly have to lower their prices and sell their goods at prices in line with those set by the Jualan Ehsan Rahmah Programme. Besides that, Pelabuhan Klang once again proposes that Jualan Ehsan Rahmah be expanded by adding more locally produced products from farmer entrepreneurs and livestock breeders in Selangor. In this way, not only do the people enjoy lower prices, but small farmers and breeders also get the opportunity to increase their income opportunities through broader direct sales networks. Honourable Mr Speaker, this effort proves that the Selangor Government truly understands the people's difficulties and is very committed to tackling food security and cost-of-living issues. The effectiveness of this programme is in line with the Titah of Duli Yang Maha Mulia Tuanku Sultan Selangor, which emphasises the importance of the people's welfare and the need to ensure that basic food can be obtained at reasonable prices. Pelabuhan Klang fully supports this initiative and hopes that the Selangor Government will continue to strengthen the Jualan Ehsan Rahmah Programme with fresh innovation so that its benefits can be enjoyed by more of all the people of the state of Selangor, with a strategic approach and efficient implementation. Pelabuhan Klang is confident that Selangor will continue to be the best example in the management of food security and food sufficiency in Malaysia.

Honourable Mr Speaker and all Honourable Members, clean water supply is a basic necessity that forms the backbone of the welfare of the people and the economic growth of Selangor. As a rapidly developing state, demand for clean water resources is steadily increasing. This makes the management of water resources a crucial priority. If it is not well controlled, we will, we will face the risk of water supply disruptions that could affect people's lives and industrial operations in the future. Aware of this reality, the Selangor State Government has taken proactive steps by introducing the Raw Water Assurance Scheme (SJAM) as a long-term strategy to ensure that raw water supply remains sufficient, especially in facing challenges such as drought, river pollution and the increasing number of water users. Measures such as the development of water catchment reservoirs, close monitoring of main water sources and control of river pollution have proven the competence of the Selangor State Government in its efforts to ensure that the water supply remains stable. Pelabuhan Klang, as the country's main logistics hub, relies heavily on this initiative to guarantee the continuity of shipping, industrial and port operations, thereby supporting economic growth in the state of Selangor. Apart from securing raw water resources, the Selangor Government, let us together extend our congratulations, has succeeded in reducing the non-revenue water (NRW) rate from 33.3% in 2017 to 27.8% in 2022. This is a very proud achievement resulting from continuous efforts to address the problems of leaks from old pipes, illegal pipe connections and leakage in the water distribution system, which have been implemented by Syarikat Air Selangor. This reduction not only saves operating costs but also ensures that more treated water reaches consumers, and indirectly improves the efficiency of clean water management in the state of Selangor. The programme to replace old pipes, implemented aggressively by Syarikat Air Selangor, has shown positive results. Up to March 2024, a total of 636.55 kilometres of old pipes have been replaced and more than 15,000 leak cases have been addressed through the leak reporting campaign carried out by Syarikat Air Selangor. These measures reflect the Selangor State Government's sincerity in ensuring that the water distribution system is more efficient and in reducing the wastage of treated clean water resources, which are very valuable. Although this success is very proud, efforts to strengthen the water supply system must continue. Pelabuhan Klang urges that the pipe replacement programme must be accelerated further, and that the use of smart monitoring technology must be expanded to detect and repair leaks more quickly and efficiently. In addition, enforcement against illegal water pipe connections must be tightened with firmer action to ensure that there is no further leakage that could harm the people and the Selangor Government.

Honourable Mr Speaker, Selangor's success in reducing NRW and in its efforts to ensure a stable water supply proves the competence and effectiveness of the Selangor State Government's administration in managing water resources excellently. Pelabuhan Klang supports all the initiatives that have been carried out and hopes that this success can be continued and further enhanced in the future, for the welfare and sustainability of the people of the state of Selangor.

Honourable Mr Speaker and all Honourable Members, the floods that have hit Selangor in recent years have had a major impact on the people and the economy of the state of Selangor. We cannot deny that climate change, rapid development and problematic drainage systems are among the factors that have contributed to the increasingly frequent occurrence of flash floods in certain areas of the state of Selangor. Therefore, flood mitigation measures must be accelerated so that we can ensure the safety of the people and avoid greater losses to the state of Selangor in the future.

Duli Yang Maha Mulia Tuanku Sultan Selangor, in the Royal Address, has stressed that the administration of the Selangor State Government must promptly implement careful planning in efforts to face disasters, especially floods, so that a devastating flood tragedy like the one in 2021 will not happen again. His Majesty also emphasised the importance of expediting the flood mitigation plan by the Federal Government and the Selangor Government, valued at RM1.774 billion, so that flood mitigation efforts can be carried out with immediate pace. As stated in the Royal Address of Duli Yang Maha Mulia Tuanku Sultan Selangor, we can no longer delay in implementing preventive measures, because such delays will only cause more losses to the people and the state of Selangor.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

I request the floor, Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Kacau betul.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Thank you, Pelabuhan Klang. I was very interested when Pelabuhan Klang raised the issue of flood mitigation plans. We also take note of the Royal Address of Duli Yang Maha Mulia Sultan on this matter, in which His Majesty admonished the Federal Government and the State Government to expedite the implementation of these flood mitigation projects. Does the Honourable Pelabuhan Klang agree with me that, in fact, this plan, this project, should have been started long ago? But when the government changed in 2022, a Prime Minister led by the party president of the Honourable Pelabuhan Klang himself, that is what started this problem. As a result, His Majesty had to deliver a Royal Address in this honourable House to admonish the State Government and the Federal Government to expedite the implementation of these flood mitigation projects, because at that time the Prime Minister adopted an attitude that, in my view, was cheap and also childish, like children's behaviour, as if trying to find faults in the previous administration and trying to delay the project, supposedly to give a negative picture of the flood mitigation project that had been approved by the Perikatan Nasional Government earlier, which was for the people of Selangor and the state of Selangor to solve this flood problem. So, if not for that Prime Minister, it would mean the flood problem would have been solved two years ago already. Does the Honourable Pelabuhan Klang agree with me?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable Taman Medan, this is a little more of a provocative question. The Honourable also knows what actually happened, with the distribution of flood mitigation projects at the federal level. I do not want to comment further because it is under investigation. Let them carry out the investigation, and we have all seen everything, and this project must continue, yes, I agree. But with a method, in a way, with procurement that is more transparent and more honest. And that is why the figure of RM1.774 billion already exists and it must continue.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Honourable Pelabuhan Klang, I want to remind the Honourable that up to today, no one has been charged, first. Secondly, it has been two years...

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable Taman Medan, I did not say charged. I said investigation first, investigation, because doubts have arisen there,

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Yes, yes. Let us set that aside. Two years since becoming Prime Minister, where are the results? Where is the direction on these projects? Moreover, recently, if the Honourable himself followed the Prime Minister's speech at the morning assembly with civil servants recently, he mentioned that the process needs to be accelerated. Who needs to accelerate this? Is it the Prime Minister who is slow, or the government officers who are slow, who is actually slow? This is what the people of Selangor want to know. That is why His Majesty even had to deliver a Royal Address in this House, because why is it so slow to approve a project of this magnitude, this important, for the benefit of the people of the state of Selangor. That is what we want to know, Honourable.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable, Honourable Taman Medan, if we look now, areas that previously flooded are not flooding, and areas that did not flood are now flooding. That is why a comprehensive review must be carried out. That is why the Prime Minister is concerned. So that the distribution of this allocation is spent in the right places, with the right targets, with a more accurate and better method, and can ensure the security and safety of the people from the problem of floods. That is what was reminded by the Most Honourable Prime Minister. The Most Honourable Prime Minister has never once prevented anyone, saying things like cannot do it, there is none, as people say, do not implement flood mitigation programmes. Moreover, even in flood-affected areas in Perikatan Nasional states, the Prime Minister went down and delivered contributions, such as in the state of Kedah and the state of Kelantan. The Prime Minister himself went down and solved the flood problems and issues in those states. And there was never any discrimination. Likewise in the state of Selangor, the Federal Government and the Selangor Government, now, have reviewed it. And I have received positive feedback from the Director of the Selangor State Irrigation Department, that all these projects will indeed be, and some are already being, implemented to overcome the flood problem in the state of Selangor.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

Pelabuhan Klang, Seri Serdang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

That is why I hope that we in this honourable House set aside political ideological differences in an effort to ensure that the sustainability of the people is given priority and importance. It is not a matter of saying whether it was approved before or not approved. Whoever the Prime Minister is, he must be responsible for ensuring that the sustainability of the people is guaranteed.

Okay, Honourable Serdang.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

I agree with the argument from Pelabuhan Klang on this flood issue. We should not look at it through a rigid scope where political parties just blame this and that. If we want to blame anyone, I think that when the so-called Sheraton Move occurred, causing a change of government, everything eventually stalled. (Uproar in the House). The government's earlier planning was disrupted. And finally, Alhamdulillah, today, if we look at the Seri Serdang area. I focus on the Seri Serdang State Assembly constituency, for example, the RTB Sungai Koyoh has already begun to move. The JPS also allocated RM15 million for a project in Kuala Sungai Baru. And everything is already underway, everything is in progress. And I am confident that if a change of government without an election had not occurred, I am confident these projects would have been completed earlier. (Uproar in the House). And Pelabuhan Klang, I would like to ask for a little opinion, this flood issue is not just about infrastructure. I think the attitude of the people also needs to be instilled, because if, I will give an example. If we do not instil cleanliness as an example to our people, littering everywhere, eventually our drains become clogged, our ditches become clogged. Do you agree or not that we should run a high-level awareness campaign for the people to keep things clean, not to throw rubbish into drains and ditches as they please? What is your view?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable Seri Serdang, I agree with what the Honourable Seri Serdang has just said. That is why, if we want to look for faults, it will never end. What matters now is that we want to move forward. We want to progress, and we think about moving on, yes. What matters is that we can resolve whatever issues are related to the people of the state of Selangor. As a representative of the people, Pelabuhan Klang deeply understands the bad impact of flood disasters on the people. The Pelabuhan Klang area is among the areas at high risk of flooding due to its geographical location and rapid development that places pressure on the existing drainage and ditch systems. Therefore, the efforts of the Selangor Government in accelerating the implementation of flood mitigation projects and upgrading the drainage system must be given serious attention with immediate pace. Pelabuhan Klang also commends the efforts of the Selangor Government, which is always proactive in tackling this issue, including through the implementation of flood mitigation in high-risk areas. However, these efforts need to be strengthened with better coordination between the Selangor Government and the Federal Government so that flood mitigation allocations can be used more efficiently.

Major projects such as the construction of water catchment reservoirs, upgrading of drainage systems with the strengthening of river banks, must be implemented immediately, without any delays caused by various bureaucratic red tape. In addition, monitoring and enforcement of development in high-risk areas must also be tightened. We do not want to see unplanned development become the cause of floods and landslides that could threaten the lives of the people. Therefore, Pelabuhan Klang proposes that the Selangor Government strengthen the role of all 12 Local Authorities (PBT) in efforts to ensure that every new development plan does not disrupt the drainage system and always maintains ecological balance in the state of Selangor. In addition, public awareness of disaster preparedness also needs to be enhanced. The Selangor Government can expand public awareness programmes on preventive measures and flood preparedness, through community programmes and disaster simulation exercises in high-risk areas. This is also a proposal from Sungai Serdang, just now. In this way, the people, Seri Serdang, the people will be better prepared and know what actions to take should a flood occur. Yes, Kota Damansara.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Thank you, Honourable Pelabuhan Klang. Just now I looked, one by one, at the flood mitigation projects and so on. Sometimes when we look at flood mitigation projects, for example in Selangor (I will not talk about other states, because we are in the Selangor State Assembly), take the Sungai Buloh flood mitigation project, whose contractor was appointed in 2020, when Perikatan Nasional was the federal government at that time. The result, when we look at it, is that the contractor was not competent and has caused delays until now, causing several places in several state constituencies, where Perikatan Nasional was also the state assemblyman for that area, the people there to be affected and to suffer from the floods. So sometimes when the Prime Minister asks for the contractors to be reviewed, and for the selection procedure, what he actually wants to see is whether the contractors who have been or will be selected are competent to carry out the task, so that what happened at the Sungai Buloh flood mitigation project, appointed when Perikatan Nasional was in government, does not happen again, not only in the State of Selangor but in other states. What is the Honourable Member's opinion?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

That is why, Honourable Kota Damansara, I stated in my speech that a review must be carried out on the projects that have been awarded to these contractors, so that the competence of these contractors is re-assessed, and any who are not competent must be dealt with by replacing them with more competent contractors. Honourable Mr Speaker, His Royal Highness the Sultan of Selangor's Royal Address..

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Permission to pass, Honourable Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

is a firm reminder to all of us

SpeakerEN

Honourable Member. Honourable Pelabuhan Klang..

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

About this flood mitigation just now, about the competent project. The competent project. Can, Pelabuhan Klang? Just a little.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Don't take too long.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

I want to hear the Honourable Pelabuhan Klang's views. When we mention flood mitigation projects, this is very specific, specifically about flood mitigation, referring to the Prime Minister's recent speech in which he directed efforts to ensure the welfare of the people on this flood mitigation issue, so that the Treasury gives leeway so that it can be expedited through emergency allocations together with a faster pre-Q. What this means is that previously we on that side fought for open tenders, and two years on they have been cancelled, and we do not know what has happened. Perhaps the tender process was not carried out, or they will not even check the contractors for five years; checking the contractors who will carry out this project is our question. And I believe that is also the spirit brought by the Royal Address. Why did the decision to appoint contractors to carry out a project of nearly RM1.7 billion in the State of Selangor take such a long time? We are not questioning who administered before. What we are questioning now is the current administration, which must make the decision. It is not us who are making the decision now. The one who cancelled this is the Prime Minister, PMX; the one who should approve it now is also the PMX administration. What we ask for, and I believe is the spirit of that Royal Address, is this. Where is the direction of this project? This is what the people of Selangor want to know. We do not need to make excuses here, saying we want the federal government to be quick, the state government to be quick, it is not quick. The issue now is who will make the decision, and I am taking the Prime Minister's latest speech, which was last week.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Yes, Honourable Member. Honourable...

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

It has been two years, Honourable Pelabuhan Klang, and indeed I mentioned that this matter involves the Klang area, involves the Sungai Buloh area, all of them, many areas are involved including the Shah Alam area too. So that is why I want the Honourable Pelabuhan Klang's view on why the Prime Minister, or the PMX administration in Putrajaya, has not been able to make that decision until today. That is what we want to know, there is no need to talk about Sheraton and all that. It has nothing to do with it. Let us talk about now: when will the current administration make a decision? It is nearly the third year of administration, nearly the third year of repeating the same rhetoric, billions and billions of projects, obsessed with billion-billion projects, but until now there is no decision to appoint the so-called competent and certified contractors to carry out projects for the people in this State of Selangor. This is what we want to know.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Honourable Member, who is it that you say is obsessed with billion-billion? Honourable Member, it is your own Prime Minister, your own Prime Minister, the former Prime Minister of yours, Honourable Member. Okay, Honourable Taman Medan, as I said earlier...

SpeakerEN

Honourable Pelabuhan Klang, is there still a long way to go?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

There is still a long way to go, Honourable Mr Speaker. From now on I will not let anyone interrupt.

SpeakerEN

Yes, well, try to summarise.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Okay, let me finish my speech. Okay, Honourable Taman Medan, if we look at the latest speech, as I said earlier at the initial stage, many factors contribute to the flood problem, among them climate change. That is why we look at the PMX's speeches on the need to accelerate flood mitigation, or overcoming the flood problem, as happened in Sarawak, in Bintulu. I was in Bintulu long ago and there was never any flooding there; suddenly now flooding has occurred. That is why the process of accelerating appointments, or accelerating the Treasury process, needs to be expedited, for the safety and also the well-being of the people affected by the flood problem. And Honourable Mr Speaker, the State of Selangor, as the most developed state with the highest income and the highest population in Malaysia, produces about 7 thousand metric tonnes of domestic waste every day, with the rate of waste growth expected to increase by 3% every 2 years. If it is not managed effectively, this problem will put pressure on the existing solid waste disposal system and will increase environmental pollution. His Royal Highness the Sultan of Selangor, in His Royal Address, stressed that collection and disposal of rubbish remains an issue that needs to be addressed more efficiently. His Majesty also stated that technology, with permission, Honourable Mr Speaker, Waste To Energy (WTE), should be explored and utilised to convert solid waste into a renewable energy source. This step not only helps reduce waste sent to disposal sites but also optimises existing resources and reduces the impact of pollution on the environment. Developed countries such as Sweden, Japan and Germany have proven the effectiveness of WTE technology in tackling solid waste management issues. For example, Sweden has succeeded in using 99% of its domestic waste for recycling and for conversion into electricity through WTE plants, making Sweden almost free from dependence on landfill sites. Sweden even imports waste from other countries to be used as an energy fuel. Japan, as a country facing a shortage of land for disposal sites, has built more than 1,500 WTE plants throughout the country. Japan is able to convert domestic waste into electricity, thereby reducing pollution and saving land space. Germany, meanwhile, practises a strict waste segregation system, using WTE technology to convert waste into energy that contributes to the national energy needs. As a result, less than 1% of domestic waste is sent to disposal sites. The rest is recycled or used as an energy source. WTE technology has been proven effective in the countries that the Honourable Pelabuhan Klang mentioned just now, and Selangor can take them as an example and inspiration by adapting this technology to the needs of the State of Selangor. With systematic management, Selangor can reduce dependence on waste disposal sites, minimise greenhouse gas emissions and generate more sustainable alternative energy sources. In efforts to ensure more sustainable waste management, the Selangor state government should accelerate the study and implementation of WTE technology, including exploring cooperation with local and international companies experienced in green technology. Besides that, enforcement against illegal dumping must be tightened so that it does not undermine the government's efforts to keep the State of Selangor clean. Honourable Mr Speaker, more systematic solid waste management will ensure Selangor remains clean and sustainable. The Selangor state government must take immediate steps in implementing these initiatives so that the State of Selangor remains a model in more effective environmental conservation management.

Honourable Mr Speaker, the State of Selangor needs efficient and adequate health services, in line with the rapidly growing population. As commanded by His Royal Highness the Sultan of Selangor, hospitals and health centres need to be increased to meet the people's needs, because many still depend on government health services due to high private medical costs. As we all know, the situation at major hospitals such as Hospital Tengku Ampuan Rahimah (HTAR) Klang, Hospital Shah Alam, Hospital Kajang and Hospital Selayang is becoming increasingly congested with a flood of patients. This situation causes long waiting times for specialist treatment and difficulties for patients who need urgent treatment. Therefore these hospitals must be upgraded immediately with more modern medical equipment and sufficient manpower to ensure the people receive the best. In addition, the construction of new hospitals and health clinics in high-population areas such as the Pelabuhan Klang, Sepang, Kuala Langat and Gombak areas needs immediate attention to reduce the burden on existing hospitals. Rural health clinics must also be upgraded so that access to health services is more comprehensive regardless of location or the socio-economic background of the people. As recommended by His Royal Highness the Sultan of Selangor, the Selangor State Health Department must immediately discuss with the Ministry of Health Malaysia so that these improvement measures can be implemented immediately and more effectively. As State Assemblymen, we must ensure this effort receives full attention and support so that the development of the health sector in Selangor can run smoothly and meet the criteria and needs of the people.

Honourable Mr Speaker and all Honourable Members, the Port continues to grow as a major national logistics and maritime centre, which has indirectly strengthened its position as a regional trade hub. Close cooperation between the Federal Government led by the Most Honourable Dato' Seri Anwar Ibrahim and the Selangor State Government under the leadership of the Most Honourable Dato' Menteri Besar Sungai Tua has made possible the implementation of the Westport 2 project on Pulau Indah, which will become a new driver of economic growth for the State of Selangor. The Westport 2 groundbreaking ceremony, officiated by the Most Honourable Prime Minister on 27 September 2024, reflected the sincerity in efforts to strengthen the country's logistics and trade sector. In 2024, Pelabuhan Klang handled 14.64 million TEU, equivalent to 20-foot containers, and recorded an increase of 4.5% compared with the previous year, contributing about 47.7% of total container handling throughout Malaysia. With this excellent performance, there is a possibility that Pelabuhan Klang will rank 10th in the world container port league, surpassing competitors such as the Port of Rotterdam and the Port of Hong Kong. Based on an economic import assessment made by the firm PricewaterhouseCoopers (PwC), this project is expected to contribute RM55 billion to the country's economic growth. In addition, the Westport 2 construction project will also create 6 thousand job opportunities that will directly benefit local residents in various fields such as port operations, logistics, maintenance and support services. Insya-Allah, Westport 2 will operate in phases, with Container Terminal 10 or CT-10 expected to begin operations in the second half of 2027, followed by Container Terminal 11, CT-11, in the second half of 2029. A total of 4.8 kilometres of wharf will be built, which will increase container handling capacity from 14 million TEU to 28 million TEU per year. This surge in economic activity will also boost small and medium businesses, including the food and beverage retail sector and transport at Pelabuhan Klang. This project will not only increase the competitiveness of Port Klang at the international level but will also ensure that Selangor remains the main pillar of the country's trade and investment. With more modern, efficient and effective port facilities, Malaysia will become a preferred destination in the global logistics chain, thereby generating sustainable economic growth. Honourable Mr Speaker, with the existence of Westport 2, the State Government should plan comprehensive infrastructure development to support the rapid growth in the Pulau Indah area. Pelabuhan Klang, especially Pulau Indah, will witness a surge in economic activity that requires careful planning in terms of infrastructure to ensure balanced development and benefit to local residents. One key aspect that needs attention is the improvement of road infrastructure and public transport systems. Studies show that the number of heavy vehicles is expected to increase due to the increasingly rapid port and industrial activities. Therefore, the government must ensure that the main roads are upgraded, and the construction of new roads and routes must be established to reduce traffic congestion in the Pelabuhan Klang area in the future. In addition, public transport systems such as stop-and-go buses and transit services need to be provided in Pulau Indah to facilitate the movement of workers and nearby residents. The Selangor State Government must plan the development of primary and secondary schools to accommodate the population of the Pulau Indah area in the future. In terms of health, existing health clinics must be upgraded to become health centres with complete and modern equipment and facilities to meet more comprehensive health needs, which are increasingly pressing.

Besides that, the development of affordable housing in Pulau Indah also needs serious attention to ensure a balance between economic development and social welfare. Strategic housing projects must be established to meet the needs of workers in the port and related industrial sectors. This step will help reduce traffic congestion and ensure they have homes close to their workplaces. Besides that, one important aspect that needs attention is the planning of a new bridge in Pulau Indah linking West Port and North Port. At present, the Muhhibah Bridge is the only main route linking West Port and West Port, and this may cause serious traffic congestion in the future. With the increase in heavy vehicle traffic and higher cargo movement flows, a new bridge must be built to improve logistics smoothness and reduce the risk of traffic congestion that could undermine the smooth operation of the port and industry. Therefore, all these plans must be implemented carefully to ensure that the development of Westport 2 truly brings comprehensive benefits to the people and guarantees sustainable and balanced growth in the State of Selangor.

On this occasion, Pelabuhan Klang would like to express many thanks to the Most Honourable Prime Minister of Malaysia for his visit to West Port last September. The Federal Government, through the Ministry of Works and the Ministry of Finance, has approved an allocation of RM14 million for the maintenance of Federal roads on the Pulau Indah highway. Therefore I request that the Prime Minister come often to the Pelabuhan Klang area; after the Prime Minister came down to Pelabuhan Klang, many..

Speaker

Yang Berhormat.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

The reduction in allocations has been announced. I would also like to thank the Minister of Works most sincerely for taking note of the issue I raised in this House regarding the three main gateways, one of which is the problem of federal roads at KLIA. Alhamdulillah, the Federal Government, through the Ministry of Works (KKR) and the Ministry of Finance, has approved an allocation of RM20,750,000.00 for periodic maintenance of mat pavement, as well as RM6 million for periodic maintenance of non-matpavement, while RM3,250,000.00 is for street light and traffic light maintenance works. Thank you, Yang Berhormat PMX, thank you to the Federal Government, thank you to the Ministry of Works and also the Ministry of Finance, and thank you to the Public Works Department (JKR) Selangor, which has also worked together to secure this allocation. Mr Speaker and all the Honourable Members, with full loyalty, Pelabuhan Klang expresses gratitude for the Royal Address of His Royal Highness Tuanku Sultan Selangor, which always serves as a guide in ensuring that this state continues to be prosperous, harmonious and well-being. His Royal Highness's Address reflects concern for the welfare of the people of Selangor, and all of us as representatives of the people must continue to work together with the Selangor State Government to realise policies and initiatives that prioritise the interests of the people. All of us Honourable Members are responsible for ensuring that Selangor remains an exemplary state that is stable, progressive and inclusive. Pelabuhan Klang hereby respectfully proposes a motion to express gratitude for the Royal Address of His Royal Highness the Sultan of Selangor. That is all. Wabillahitaufik Walhidayah. Assalamualaikum Warahmatullahi Wabarakatuh.

SpeakerEN

Yes, Bukit Gasing, please proceed. May I give you 20 minutes? Until 1 p.m. Yes, go ahead, go ahead. Begin.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

If it's 20 minutes, Hulu Kelang will have to come in quickly. Mr Speaker, I support this, and thank you for giving way to Bukit Gasing to debate this motion. I stand before everyone with great pride, just like my colleague, the Honourable Member for Pelabuhan Klang, to celebrate an outstanding achievement of the Selangor State Government which, as we know, shows very encouraging financial performance and revenue collection in 2024. The latest achievement, where revenue collection of RM2.8 billion is the highest record for the State of Selangor compared with an estimate of only RM2.2 billion, clearly shows the high commitment of the State Government in managing financial resources efficiently and prudently. This is managing finances without raising land tax. This success not only proves the State Government's ability to plan and implement effective financial strategies but also reflects investors' confidence in the state's economic stability. This success is also the result of close cooperation between the State Government, the private sector and the people of Selangor. I would like to extend congratulations to all parties involved in achieving this proud accomplishment. Thank you and congratulations to all civil servants, the EXCO team and Dato' Menteri Besar. Let us continue this spirit of cooperation and unity to ensure that the prosperity and well-being of the people of Selangor remain guaranteed. I am confident that with close cooperation we can bring Selangor to an even higher level. As a dynamic and progressive state. I would like to propose that the State of Selangor needs to increase the revenue that we collect today.

Although our record of RM2.8 billion is a figure to be proud of, this figure is still less than 1% of the GDP of the State of Selangor. If we want to compare with state governments in first-world countries such as the United States, state government revenue from tax collection and from various State Government activities, and subsequently State Government expenditure, reaches 15 to 20% of GDP. Do we want to collect money for the sake of collecting revenue? No. But if we are determined and resolved to make our government bigger, collecting higher revenue, this enables the State Government to pursue state development objectives, economic development and also social objectives. For example, the development of elderly care, the care economy. We are currently discussing the care economy heatedly, apart from policies that encourage private sector participation. If the State Government wants to help groups who need assistance when they become elderly, persons with disabilities, mothers with young children, the State Government needs to have the financial capacity to do so. I give as an example efficient public transport. The level of public transport in the State of Selangor has shown improvement since the Pakatan Harapan Government became the Government of the State of Selangor. Indeed, the Smart Selangor bus that we introduced has become a game changer for the people of the State of Selangor. Congratulations, I say. We are pursuing a rail line, which I see other State Governments do not have the determination of the State Government of Selangor. But for us to realise a traffic and public transport system of first-world standard, such as in Korea, Taiwan, Singapore and so on, we need greater funds, and today I would like to propose to the Selangor State Government that we need to be determined to increase state revenue.

Let the Selangor State Government be a bigger government, not merely for the sake of being bigger, not just to increase the number of civil servants, but to become a government that is bigger so that we can achieve the objectives of developing the state and the social objectives. Among the examples I want to congratulate is the zero discharge waste policy. The zero discharge policy has generated RM121 million in revenue for the Selangor State Government. Congratulations, and I believe there are many more sources that we can explore. I would like to propose that a Special Select Committee be established in this House so that State Government and Opposition ADUNs can begin to work together to brainstorm, with permission, new ideas so that we can increase State Government revenue, and then the government can spend on state development to, to implement our objectives. Another matter I want to congratulate the Selangor State Government on is the government's positive attitude towards the development of artificial intelligence. We do not see it as a threat but as

something of strength that must be fully utilised. So congratulations to the Selangor State Government for allocating RM5 million in the 2025 budget specifically for AI initiatives, and congratulations on the cooperation with Google through the AI Trailblaizers programme, and for civil servants, we embrace, with permission, the use of AI for a more efficient and effective administration, so that we can do more with the same workforce. So, I say congratulations.

And thirdly, I also want to congratulate the implementation of the Speed Selangor Policy, as my colleague from Pelabuhan Klang mentioned earlier. To accelerate the processes of land development and planning permission in order to generate economic growth, and to provide ease of doing business for investors in the State of Selangor, whether foreign or domestic investors. Reducing the process from 3.5 months to 14 days is something very good. I say congratulations, and now I would also like to propose two more things that we can do as a State Government to facilitate and ease economic development in the State of Selangor. The first is that planning permission applications for some developments that exist today may be exempted. For example, tuition centres. A tuition centre that wants to open in a shop lot, with permission, an office shop. They have to go through a process of months to apply for approval, unlike a grocery store, which is much faster. Likewise, elderly homes, which are increasingly needed in our society, also have to go through a process of months to obtain a kindergarten permit and so on. Many economic activities can be facilitated so that application and approval processes can be expedited, in order to help our entrepreneurs, most of whom are domestic entrepreneurs, local entrepreneurs. So I hope the State Government can look at cases where the planning permission process can be shortened and the approval process for these economic activities can be accelerated. The second,

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

The Honourable Member wishes to interject.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Boleh.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Thank you, Honourable Member. I very much agree with this Speed programme just now. But like the Honourable Member for Bukit Gasing, I would also like to add a little, so that we can look together again to ensure this Speed programme is not only for industry. The same goes for agricultural areas, for example. Because in my area, Honourable Member, do you agree, if I may, that this programme be extended, with permission, to industrial areas too, eh, sorry, agricultural areas too. Because in my area

there are many agricultural areas where, the process to obtain planning permission (KM) is extremely difficult. That is all, thank you.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

There are some cases where planning permission is indeed needed. For example, urban development, large housing areas, commercial areas, which have an impact on the environment, these must go through KM approval. But many of these applications, such as tuition centres and elderly homes, why do they have to go through a process of up to 4, 5, 6 months to obtain approval? In the end, many have to spend rent money and hold the property for months before obtaining a business licence and being able to operate. Secondly, I want to speak up for small traders, there are many in Petaling Jaya but I am sure across all of Selangor. In Petaling Jaya there are many small traders in markets and food courts, who are not young people. Not in their 20s–30s, some are in their 50s, some may already be in their 60s. Those who do not have employees to assist in their shops find it difficult to run their businesses. Traders selling fish, if they want to lift 300 kilos of fish from the lorry to the shop without an assistant, it is extremely difficult. Those running businesses selling vegetables, chicken and so on without a shop assistant find it extremely difficult to carry on their businesses. I hope the Government can help facilitate these small businesses, which are mostly operated by Malaysian citizens, our local children, by allowing them to hire foreign workers who have permits. They must be present in the shop when the foreign workers are in the shop. Foreign workers must not be allowed to be in the shop alone without the shop owner, but I propose that these foreign workers be permitted to act as assistants, especially for traders aged 55, 60, who are not strong enough to lift 200 kilos of chicken from the lorry to the shop, or to cut 100 chickens every morning. This requires strong physical energy. Now many are forced to retire when we enforce no foreign workers, because there are not enough local people willing to work as shop assistants. So I hope this can be considered. Yes, Taman Medan?

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Thank you, Honourable Member for Bukit Gasing. I want to hear the Honourable Member for Bukit Gasing's view on this matter because I am aware, and I believe this involves our area, where many of these new traders are facing enforcement action by the Petaling Jaya City Council (MBPJ). Do you agree that for 3D work, Dangerous, Difficult, Dirty, some leniency should be given so that foreign workers can be hired as long as the business, the premises, is still rented and operated by local citizens. Because I see that MBPJ, among cleaning contractors, still uses foreign workers. How can foreign workers not be allowed at stalls, yet the contractors that MBPJ appoints to lift

rubbish and so on, doing these 3D jobs, are made up of other government agencies that also appoint and hire foreign workers. So, does the Honourable Member agree with this view?

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Not only do I agree, I am the one who raised this issue. The Honourable Member for Taman Medan agrees with me. Thank you, Taman Medan.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Agreed, I agree with Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Taman Medan, for supporting the argument from Bukit Gasing.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

I'm just worried that Sekinchan doesn't know. Does Sekinchan know about this? That's what we want to know.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Let me argue now. Sekinchan knows.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman Medan

Ah, lambat.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

But thank you, Taman Medan also supports. Perhaps in some places outside the city there are enough local people willing to work as assistants for these stalls, but in urban areas it may be rather difficult to find local people to work – 3D jobs like these in markets and food courts. I hope this can be given attention.

Mr Speaker, may I have a little more time?

So, the next issue, which is also closely related to economic development. Just a moment more. The next issue, also closely related to economic development and contributing revenue to the Selangor State Government, is the renewal of leasehold land, especially for land with commercial status. I have raised this issue many times in this august House. I hope the State Government, I know it can settle this, I hope the State Government will give an answer and a scheme for traders who own commercial land whose lease period is nearly expiring. The leasehold is nearly expiring, and in the PJ Old Town area most of these owners are individual owners, not big corporations, not large companies. They cannot afford the premium if the premium is calculated using the existing formula today. They are interested in continuing their business there, they

are interested in extending the lease period if given a little leniency, if given a scheme that can be a win-win, where the State Government gets revenue and they can also keep their holdings there and continue the business. Now there are many lots whose lease periods have expired, because they really cannot afford to pay RM1 million or RM300 thousand as premium to extend the land lease. So I hope this issue can be given attention. I would also like to raise the issue of public welfare, namely parking issues in fast-growing commercial areas. I hope the State Government can consider expanding the existing 2-hour parking scheme. Thank you for having started it. The Honourable Kinrara has started the 2-Hour Parking Scheme in the central area that has multi-storey car parks and has banks, but I hope it can also be expanded to commercial areas that do not have multi-storey car parks, because they too have needs. Not all parking spaces need to be made 2-hour parking; perhaps 5 lots or 10 lots can be made limited 2-hour parking, and also areas that may not have banks but have needs. For example, in the Bukit Gasing area, such as at Section 17 next to the Seventeen Mall, where the mall has multi-storey parking but around the shop area there are no banks. If we follow the circular, we cannot implement a 2-Hour Scheme; I hope it can be expanded. Another example is the area of Seksyen 8, Petaling Jaya, where it is almost impossible to get parking during working hours because that commercial area is so fast-growing. If 10 lots can be provided as limited 2-hour parking, it will help customers come to the shops, and this will help the shops find more customers. I would also like to propose to the State Government that it help people who want to pay land assessment. Now we have moved to a 100% digital system, no longer sending bills to every house. I congratulate us, we must indeed move forward towards the digital era, but many people may forget, may not keep a file, may not know where to find their land assessment bill, and if they cannot find their assessment bill, they postpone payment. "Never mind, next week I will look for it, this week I am busy." So, I would like to propose to the State Government that a WhatsApp hotline be set up where people can WhatsApp, "this is my home address, can you please give me the account number to pay my land assessment?" Once there is an account number, it is easy to pay on the State Government of Selangor's website, but if there is no account number for this land assessment, it is difficult to pay. To the people who keep their past bills, thank you for having good organisation skills, but for those who do not keep them, who find it hard to retrieve them, I hope the Selangor State Government will help so that we can provide a facility for the people and also collect revenue more quickly.

I would also like to bring a request from civil servants in Selangor State, where there are civil servants on contract status, and their contracts after one round are extended and renewed and renewed again, and there are civil servants

who have been on contract status for more than 10 years, not holding permanent posts. I know that obtaining a permanent post from the Public Service Department (JPA) is not easy. Sometimes it is indeed difficult to get a permanent pensionable post. Perhaps a middle path that the State Government can consider is a permanent post that is non-pensionable. A permanent post with EPF (KWSP). Because if we have extended their contracts three times, it can be considered that this worker is good enough and qualified for us to take them as a permanent employee. If we cannot give a pension, because there are constraints with JPA, they can become permanent workers under EPF, and at least they will have job security, which adds motivation for them and reduces their anxiety. Finally, with my last 5 minutes, before

Bukit Gasing, may I have a little? About permanent and contract workers. Honourable Speaker and Bukit Gasing, I refer back to the House question I raised earlier in the previous sitting regarding Selangor state civil servants. I asked about the number of permanent and contract status workers in local authorities (PBT) and also in various agencies, agree or not Bukit Gasing, because I think the number of permanent and contract workers is mostly like this, I focus on PBT first, because I see it is not quite fair and the numbers are rather weakening the spirit. For example, I will give an example, at MBSA for instance, the permanent workers are 744 but the contract workers are 794, meaning contract workers are higher than permanent workers. And I take another example at the Sepang Municipal Council, 466 contract and 398 permanent, which is actually not quite balanced. The number of permanent should be more than the number of contract, and what efforts have been made by these PBT and agencies to at least find a way to give space to these people so that they can get the place they deserve, so that we can improve services. So what is Bukit Gasing's view? Thank you.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Agreed. I hope Dato' Menteri Besar can give a response during the winding-up later.

In the 3 minutes remaining I would like to raise several area issues for the Bukit Gasing State Assembly seat, and I hope the State Government can give attention. One, a public hospital is very much needed in Petaling Jaya, perhaps the only urban area in the Klang Valley that does not have its own public hospital, and this year with PPUM (University of Malaya Medical Centre) increasing its fees, from admission to the ward, from seeing a doctor, at a sudden high rate, I hope the Selangor State Government will work with the Ministry of Health to set up a public hospital for the Petaling Jaya area. Land can be found if there is a desire to build such a hospital.

Second, cemeteries for non-Muslims. As we know, cemeteries in Petaling Jaya are already full. Those who are wealthy can go to private cemeteries. Under their beliefs, they can cremate bodies, can go to a crematorium, but those whose religious beliefs require burial have no choice, they must borrow money, find money to go to private cemeteries. And I would like to propose a solution that may help in the short term: allow Petaling Jaya residents to use cemeteries in other local authorities. For example, Shah Alam does not allow non-Shah Alam residents to use Shah Alam cemeteries. So I hope the State Government can consider this because there is a shortage of cemeteries for non-Muslims in Petaling Jaya.

Third, the Selangor public library in the Petaling Jaya area, formerly at the Jaya One shopping complex. This library closed during the pandemic. We understand that during the pandemic many things did not operate, but unfortunately this library did not reopen after the pandemic ended. I hope the State Government can give attention so that this branch is reopened, do not let Petaling Jaya residents be deprived of their library, which exists throughout the Selangor State.

Next, I would like to request that the State Government consider the need for a flyover from Jalan Penchala in the PJ Old Town area to the Taman Medan area. I hope the State Assemblyman for Taman Medan can also support this to facilitate residents who commute between the Taman Medan area and the urban area of Petaling Jaya. If the Taman Medan State Assemblyman wants to support the PJD Link, his constituents must pay a RM4.00 toll every time they commute, but there is no need for a highway, just one flyover is enough to cross the NPE, because there is no flyover, 45 minutes of jam to cross a distance of only 200 metres. So this 40 minutes of jam can be saved with a flyover above the NPE or an underpass below the NPE. I hope the State Government can arrange this, or request the Ministry of Works to build it under the 13th Malaysia Plan (RMK-13), the final one, and the second last one is the PJ Old Town market. With permission, I would like to raise this issue because 3-4 years ago MBPJ increased the rent for traders at the Jalan Othman market, and this rent is 3 times higher than other markets in Petaling Jaya. There are many complaints, this is not fair. I hope it can be standardised. If they want to raise all of them, raise all of them. If they do not want to raise all of them, reduce them back so that they are uniform. Do not forget, Sungai Way Market is much cheaper than Jalan Othman Market. Taman Mega Market is much cheaper than Jalan Othman Market. Time does not permit,

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Just a little. I want to support Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Okay, Taman Medan supports.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Because I have raised it before but Sekinchan did not listen. Today Bukit Gasing has raised it, Taman Medan supports, I hope Sekinchan can hear and ask MBPJ to take action.

SpeakerEN

Honourable ...

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Time is up. I'll wrap up now. Thank you for giving me the floor to support the motion to express gratitude for the Royal Address of His Royal Highness, and many thanks to Taman Medan for being a supporter today; the State Government assemblyman supports my ideas and does not oppose and obstruct. Thank you.

SpeakerEN

Honourable Members, the time has reached 1.00 p.m. I hereby adjourn the sitting of the House until 2.30 p.m.

(THE HOUSE ADJOURNED)

(THE HOUSE RESUMED)

(DEPUTY SPEAKER IN THE CHAIR)

Deputy SpeakerEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh. Peace be upon you. Good afternoon. The House resumes for the debate on the Royal Address of His Royal Highness the Sultan of Selangor. I invite the Opposition Leader, Hulu Kelang.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Thank you, Mr Speaker. Assalamualaikum warahmatullahi taala wabarakatuh and Salam Sejahtera. Honourable Members, Heads of Departments, Members of the Public Service, the Secretary of the House, officers present this evening. I wish to take part in the debate on the Royal Address of His Royal Highness the Sultan of Selangor.

Mr Speaker, on behalf of my colleagues in Perikatan Nasional, I wish to congratulate Honourable Dato' Dr. Ahmad Fadzli Ahmad Tajuddin, who was recently appointed State Secretary, and I am confident that Honourable Dato' will be able to continue efforts to develop a state that is developing so rapidly. We also welcome the appointment of the new State Financial Officer, Datuk Dr. Haniff Zainal Abidin. These two new senior officers will certainly inspire a high spirit of work among officers and members of the public service to formulate new policies, drive new growth, and continue to generate development in the state of Selangor. Dato' State Secretary and Datuk State Financial Officer, please lead and guide Dato' Menteri Besar to bring the state of Selangor back up and return it to the glory it enjoyed in the era from 2014 to 2018. Have compassion for Dato' Menteri Besar, who is being harassed by certain groups. Do not leave him alone. I am confident that the State Financial Officer and Dato' State Secretary will work together in the effort to develop this state that we love. This evening too, Perikatan Nasional wishes to record our highest appreciation and thanks to Dato' Setia Haji Haris Kasim, who has devoted service and contributions of such magnitude to the development of the state of Selangor over 27 years. I am confident that Dato' Setia will continue to be loyal in contributing ideas and services to the state and the nation, based on his extensive experience and knowledge of administration.

Mr Speaker, I listened attentively to the Royal Address of Tuanku Sultan yesterday morning. As usual, Tuanku Sultan was rich in royal advice on seeing Selangor strong and prosperous for the sake of the people of Selangor. Perikatan Nasional upholds Tuanku's royal advice and will continue to play its role as an important bloc in this House for checks and balances, check and balance. We will point out matters that need improvement, and we will propose suggestions for the public good. But in truth, I am also tired of reminding Dato' Menteri Besar and the Members of the State Executive Council about these problems. At every sitting of the State Assembly, I and the 20 Perikatan Nasional State Assembly Members give our views and criticisms, but all of them are not taken seriously, like pouring water on a taro leaf.

Mr Speaker, in the proclamation read by the Secretary of the House yesterday morning, Clause 1, Article 70 of the Constitution of the State of Selangor 1959 was stated, which provides that Tuanku Sultan shall from time to time summon the sitting of the Assembly, in exercise of Tuanku Sultan's power for this purpose. Tuanku has summoned and fixed the dates from 18 February to 3 March 2025 as the sitting dates. I urge the government to maintain these dates, so that the government is given full scope to answer 210 oral questions submitted by Perikatan Nasional, and this period also allows for more active participation by State Assembly Members in debates and question sessions. Do not cut short and do not condense, especially as the debate of the leader of the opposition has no limit or boundary under the convention of any House whatsoever. Thank you, Mr Speaker, for that agreement.

Mr Speaker, Tuanku Sultan has firmly commanded all of us that relations among the people must be strengthened, and that they must avoid splitting apart due to political interests and differences of race and religion. The state of Selangor is a state rich in diverse religions, races and cultures, and this diversity is in fact a strength and a very important asset for us to advance as a prosperous, sejahtera and harmonious state. This is our strength Mr Speaker, the concept of unity in diversity is celebrated by all. In Latin it is said (Latin phrase) which means where there is unity, there is victory, Insyaallah.

Therefore, it is important for all parties to focus on the commonalities we share together rather than struggling with quarrels and disputes over our differences with one another. With permission, Mr Speaker, "it is important that we focus on the many common things we have together, rather than become obsessed with differences between us". In this way we can build a strong, united and harmonious society and state.

For nearly 70 years, the people of Malaysia have chosen to live together in peace and harmony. We have integrated in one community, in one society consisting of various races, religions and cultures, and integration in this diversity is a conscious choice and not coercion, it was our choice Mr Speaker, for the last 70 years to live together as the people of Malaysia. Therefore, for the next 70 years, we must make the right and responsible choices to shape and build a better and more glorious future.

Mr Speaker, high state revenue and large government reserves are not something to be boasted about. I heard the debate of Pelabuhan Klang, and I understand he has an election this year. What options are in his hands? Insyaallah, if you listen to the speech just now, he is qualified to hold the post of Deputy President of PKR. The prosperity of a state does not rest solely on figures, growth and economic indicators, but the challenge is how the wealth of a state can be enjoyed by the people of Selangor. Tuanku Sultan once again gave a reminder that state development planning must focus on programmes that benefit the people and not merely those that can bring profit.

As I recall, this is the second time Tuanku's royal advice has been that we should not be overly preoccupied with figures and large reserves, while the people at the bottom are suffering. This is what is happening in the state of Selangor. I would like to draw the attention of this House to the fiscal health status of the state of Selangor compared with several other states in Malaysia.

Mr Speaker, on 3 February 2025 The Edge reported this matter based on statistics and figures from the Department of Statistics Malaysia (DOSM), in which the analysis presented in this article stated that over the past 70 years, 70 per cent of Malaysia's GDP was contributed by six states, Selangor, Sarawak, Johor, Penang, Sabah and Kuala Lumpur. DOSM reported that in 2023, Selangor contributed 25.9% to Malaysia's GDP with a value of 406.1 billion ringgit. But although Selangor is the largest contributor to the nation's GDP, in the report stated here, Selangor is not the most prosperous state. Selangor was not the most economically prosperous, that is the report that was stated when there was an analysis of Malaysia State Financial Positions.

Mr Speaker, GDP per capita recorded RM62,492 compared with Kuala Lumpur which recorded RM131,038. Although Kuala Lumpur contributed only 15.9 per cent to Malaysia's GDP, in the same year, 2023, which placed Kuala Lumpur as the second largest contributor. Once again this proves that we should not be too enamoured with the total contribution to the nation's GDP, when in reality Selangor's GDP per capita is not that large, and in fact is far lower than what we witness in Kuala Lumpur. Second point on the same topic. Bukit Gasing, I will finish this, I have given you the opportunity. I also wish to share an analysis that confirms that the revenue to GDP ratio in Selangor is 0.67% smaller than Kedah and Kelantan, which recorded 1.12% and 3% respectively in 2023. That means Selangor's economic size, which recorded 600 billion ringgit, compared with the revenue recorded totalling 2.708 billion ringgit in 2023, so the revenue to GDP ratio is only 0.67% compared with the rate in Malaysia of 16.2%. Once again, although Selangor contributes to the nation's GDP with a record of 25.9%, if we break it down and use the GDP per capita matrix, it does not provide prosperity or wealth to every household in the state of Selangor compared with other states. Finally, on the same topic, I also found in the same report a very comprehensive report covering four full pages. It also found that the services sector, I ask Honourable Kinrara to pay attention, contributes 61% compared with the manufacturing and processing sector at only 29.4%. The construction sector only 4.9%, the agriculture sector only 1.1% to the state's GDP. And if we look at this breakdown, the contributions of the sectors mentioned just now are very vulnerable and need immediate attention.

I also wish to refer to the approach taken by Honourable Kinrara and also Dato' Menteri Besar, where the state government should take proactive action to maintain Selangor as a hub and make strides in the semiconductor industry. Because once again, if we refer to the statistics (DOSM) on page 53, it reports that the manufacturing sector contributes only 24.9%, as I mentioned earlier, compared with Penang at 46.5% which makes Penang the E&E manufacturing hub in the Asian region. The contribution of the manufacturing sector in the state of Johor is higher than the state of Selangor, recording 29.8%. Therefore I invite Members of the House. While we are grateful for the state's financial performance, we must also refine it so that there are actions that can be taken to ensure this growth is more sustainable and can be maintained and even enhanced for the times to come. Compared with Sarawak and Penang. Honourable Kinrara, both these states have taken steps to balance economic contributions between the manufacturing sector and the services sector. For example, Sarawak recorded a contribution from the manufacturing sector of 26.5% and from the services sector of 38.3%, while Penang recorded a contribution from the manufacturing sector of 46.5% and the services sector totalling 48%. A matter that should also be given attention this evening is that I managed to raise in an oral question during the question and answer session that Selangor is recording a trade deficit of RM70 billion. Compared with states such as Sarawak, Johor, Penang and Sabah, which all recorded trade surpluses or trade excess. Johor recorded total trade of RM561.6 billion with export value of RM290 billion. Meanwhile Penang recorded total trade of RM697.7 billion with total exports of RM447.4 billion. And among the most important components that boosted export value is Integrated Electronic Circuits with a value of RM198.8 billion. Let us compare this with what we have in Selangor this evening. Selangor recorded total trade of RM574.9 billion. Unfortunately, total exports were only RM252.7 billion and the export contribution from Integrated Electronic Circuit products was only RM33.8 billion. I have proposed in this House several measures to the state government to assist industry players in the Selangor economy to penetrate new markets. Although the answer given by Dato' Menteri Besar this morning was that Selangor has many port facilities, airports, and ports used as places to bring in goods, including intermediate goods, into the state of Selangor, this does not mean we are not doing anything to ensure these goods can be improved in value

and exported to new markets so that the trade deficit we are currently experiencing of RM70 billion can be balanced in the near future.

Mr Speaker, I am focusing on these matters because, as I mentioned earlier, the state of Selangor has just received a new State Secretary and a new State Financial Officer. Both are Doctors, both have very extensive experience. Bring Selangor to a level that is competitive and able to drive sustainable growth. Insha Allah. Do not depend any longer on land revenue. Please. In the previous session we debated this. Bukit Gasing has already started smiling. Not yet, I will, I want to expose more this evening. Land tax and contributions from the Federal Government. I note the State Government's announcement that state revenue recorded a total of RM2.9 billion in 2024. Meanwhile, state reserves recorded RM4.1 billion. Pelabuhan Klang this morning was loudly happy about these figures. Bukit Gasing also supports this, because DAP also has an election on 16 March coming up. Bukit Gasing, Pelabuhan Klang, the question that often becomes the subject of debate in this House is..

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Hulu Kelang, may I request clarification on the topic, because earlier the topic was not concluded, but I still have a question?

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Kampung Tunku is contesting?

Puan Lim Yi WeiDAP · PHKampung Tunku

(ketawa)

Deputy SpeakerEN

Hulu Kelang, may I have it?

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Kampung Tunku is contesting? If not, I will give way. Whoever is contesting, I will not give way.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Ok. I refer to the article mentioned by Honourable Hulu Kelang. Regarding the point where Hulu Kelang stated that Selangor Was Not The Most Economic Prosperous (with permission) but in comparison with Kuala Lumpur, but in the same article, two paragraphs below the same article, it also states that this different (with permission) could be explained by the fact that the population of Selangor at 7.21 million is more than 3 times that of Kuala Lumpur at 2 million. So what is the comment of Honourable Hulu Kelang on this difference and this explanation in the same article? Thank you.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Thank you, Kampung Tunku. You are very clever, Kampung Tunku. He read it, I also read the same article. That is one of the factors taken into account in terms of population size. But I'm coming to my point about reserves. My question is why I said the reserves are large. Ok, our population is large. Sorry, with permission Mr Speaker.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Mohon penjelasan.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Wait. I want to finish this answer first so that we can manage the reserves or revenue, which is so large, for the purpose of bringing prosperity and wealth to the people, who number 7 million, in the state of Selangor. There are several initiatives that have been taken, and I will also give my views on the opposite side, but let us go through to our discussion this evening so that Kampung Tunku can understand from which perspective I am arguing this matter, namely that in 2024 we had a lengthy discussion in the previous session. 75% of state revenue, perhaps this is new information to the State Financial Officer. In 2024, 75% of state revenue depended on land premiums and land tax. And in this House too, Dato' Menteri Besar promised to implement efforts to diversify state revenue with a strategy to strengthen state government revenue in the form of contributions and dividends from subsidiaries and statutory bodies and State Government Agencies. That is the promise of Dato' Menteri Besar in the House. I welcome this as a very positive action. The only question I have is, what successes have been achieved, or is it only a promise? Because Mr Speaker, in the session last year I brought a PKNS board of directors' meeting paper. The Awakening dated 2 February 2024.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Honourable Member, before we change topic to PKNS, let us settle this first.

Deputy SpeakerEN

Bukit Gasing, give space to Hulu Kelang.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Many arguments have been put forward just now, but what exactly is Hulu Kelang's point? Because Selangor's GDP, which has been increasing year by year, is something that Honourable Hulu Kelang also glorified when Honourable was sitting over there. I did a simple Google search and also found many newspaper clippings in which Honourable glorified the position of Selangor's state GDP when Honourable was Menteri Besar. So let us admit that the size of the economy is an important matter. GDP per capita is also important, but we do not say China is an underdeveloped economy because China's GDP per capita is low. The whole world acknowledges that China's economy is the second largest in the world, very large and very important, because as an economy measured by GDP, it is indeed a very large figure. So although our GDP per capita is lower than Kuala Lumpur, this is like Hong Kong's being much higher than China's. No leader in this world says Hong Kong is more advanced, Hong Kong is more important, Hong Kong's economy is more important because Hong Kong's GDP per capita is higher than China's. But China is important economically because its GDP is large. So let us admit that this is a fact, when Honourable was sitting over there, Honourable also glorified this matter.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

It is not that I am glorifying it; I am grateful. As I said earlier, when these figures (growth, reserves and GDP) are good, of course we feel this is an achievement. But I have also argued in this House, Honourable Bukit Gasing, that we should not be too enthusiastic about large savings. This is relevant because when growth is high but GDP per capita is slightly low, why should we maintain large savings? We should be looking for more innovative approaches to ensure that large savings can help raise GDP per capita a little. That is what I mean. The economic situation in Hong Kong with China is certainly different from Selangor. We have a housing problem, which I will discuss. We have a jobs problem. We have a cost of living problem. We have an inflation problem. I am sure that although these indicators are beyond the scope of the State Government, there are several initiatives that the State Government can take to raise GDP per capita for the people of the State of Selangor. That is why I want to refer to the same report. When I tabled this report, the State Government did not give an answer but lodged a police report against me. And I took action in accordance with the existing law and, thank God, after a year of struggling with this legal issue, the court earlier this year and the Attorney General's Chambers decided to MFA kan this case. No action was taken because it is my right as a Member of this House, who has privilege to state these facts in the House. I do not want to come to this House and use this platform as a shouting match, as happened in Parliament between Hulu Langat and Kinabatangan. This is not our way. Jelutong, friend of Bukit Gasing. Hulu Langat, friend of Seri Kembangan, Seri Serdang. Pendang is good. He... it's alright.

Mr Speaker, this report includes an item reported by the Selangor State Development Corporation (PKNS). I hope its CEO is here, or its Chairman, but the Chairman is not here, and the CEO is not here either. "PKNS 2023 Wins." This supposedly is PKNS's achievement. What is one of them? Selling the Broga land. Last year I stopped there. But this year I want to continue the debate. Mr Speaker, this land is located in Broga, Semenyih. Its area is 997 acres. There are 3 plots. Plots 1 and 2 have an area of 897 acres. Plot 3 has an area of 100 acres and there are quarry activities. So a valuation was carried out. In 2022, a private consultant carried out a valuation at a price of RM11.68 per square foot. The Valuation and Property Services Department (JPPH) in the same year carried out a valuation of RM10.00 per square foot. So it was advertised. On 2 June 2023, there were three companies that took the documents. But only one company took part. I once sat as Chairman of PKNS. We have a rule that if only one company takes part, the tender must be reopened to ensure transparency and governance. But unfortunately it was not reopened, and instead PKNS went ahead and issued a letter of offer to the company Trans Loyal Development Sdn. Bhd. This is a letter of offer from PKNS. But what is strange is that JPPH set the valuation at RM10.00 per square foot, while the private valuer set it at RM11.68 per square foot. PKNS's land was sold to Trans Loyal Development Sdn. Bhd. at a price of only RM6.73 per square foot. That is why I often ask, is the State Government an agent for selling land? Yet the mandate given to PKNS in 1960 was to open townships and build affordable and low-cost houses for the people of the State of Selangor. Today PKNS has become an agent selling land at a price far lower than the valuation by JPPH. Then, that is for Plots 1 and 2. So, if compared with JPPH, we lose RM3.27 per square foot. If compared with the private consultant, we lose RM5.31 per square foot. What is PKNS's reason? In the paper for the sale of land to Trans Loyal Development Sdn. Bhd., the area that could be used for development was supposedly only 669 acres, or 74% of the 897 acres.

But Mr Speaker, when the ownership of this land was transferred, PKNS transferred the entire 897 acres to Trans Loyal Development Sdn. Bhd. The company did not have to pay at all for the 231 acres to PKNS. Got it for free. Pelabuhan Klang may check. Thank you. Insya-Allah, we can win the election. What are the implications for PKNS? The implication for PKNS is that it has suffered a loss of 231 acres of this land, between RM95 million and RM154 million. If it were done transparently, responsibly and with good governance, RM154 million could raise the GDP per capita we discussed just now. It is not a small amount, RM154 million. The health problems of the people below, the education problems of the people below. Then, the third plot. Mr Speaker, this is even more interesting. Its area is 100 acres. It was sold at a price of only RM5.73. Do not make false accusations, Pelabuhan Klang. That is the command of Tuanku. Here is the letter of offer. RM5.73 per square foot. When I searched, the owners of these new lands were given easily by PKNS. This is the search I made. Plot 1 to Trans Loyal Development Sdn. Bhd. Plot 2 to Sutra Maya Resources Sdn. Bhd. But the shareholders are the same people. The Board of Directors is the same people. Dato' Lee Swee Eng, Lee Swee Hong, Lee Kian Huat, Lee Kok Heng. PKNS land. I do not want to take a racial approach here. But why could over 800 acres of land be let go to these companies? Different names, same shareholders, same Board of Directors. This is what I criticised in the sitting of the House; it is not that I want to be an enemy of the State Government. I love the State of Selangor. This is my state. I want every revenue and income of this State Government to be channelled back to the people of the State of Selangor, but not to these ultra-rich groups. I also have valuation reports for these plots. One from JPPH and one from a private valuation. I ask that this matter be raised with the Dato' State Financial Officer, and the Dato' State Secretary should lead the Dato' Menteri Besar, poor him. He is my friend, but he is being squeezed from left and right by his own people. Not us. We here are people who want to help the Dato' Menteri Besar develop the State of Selangor. Not finished yet. Sentosa, listen carefully, Sentosa. Want to contest? Contest, don't stand, sit there.

There is one more thing, Mr Speaker. Two weeks ago, the Dato' Menteri Besar and the top management of MBI (Menteri Besar Incorporated) were at a new hotel in Kuala Lumpur, the Imperial Lexis Hotel, Jalan Ampang. Pelabuhan Klang certainly has no reason for this, because the Menteri Besar and the Board of Directors of MBI... Pelabuhan Klang has not been appointed until this afternoon. When we win, insya-Allah, we will move over to that side. If not, to this side. We will go there. What happened at the Imperial Lexis Hotel? I was informed that this was a gathering or retreat of MBI. Okay, no problem. They discussed several matters, especially policy, the MBI Thrive 28 vision, and among the matters discussed at the Imperial Lexis Hotel was the Land and Property Division Transformation Plan of MBI. Not slander. As we are aware, PNSB (Permodalan Negeri Selangor Berhad), Mantap Murni Sdn Bhd, Bukit Beruntung Golf and Country Resort Berhad, Kumpulan Hartanah Selangor Berhad, Landasan Lumayan Sdn Bhd, Central Spectrum Malaysia Sdn Bhd. All of them are under the ownership of the Land and Property Division, and what happened at the hotel was to discuss the Land and Property Division Transformation Plan of MBI. But what shocked me is that in 2023, five companies that I just mentioned, in the MBI retreat. The five companies, PNSB, Bukit Beruntung Golf and Country Resort Berhad, Kumpulan Hartanah Selangor Berhad, Landasan Lumayan Sdn Bhd and Central Spectrum Malaysia Sdn Bhd, contributed only 3.5% to the MBI Group, with a value of RM169.1 million. These five companies contributed to the MBI Group only 3.5%, and what is more distressing, zero dividends for 2023. I am raising this matter, wait a moment, Honourable Member, I am raising this matter.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Sedikit penjelasan.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Let me finish. I am raising this matter because of what I said just now. The promise of the Dato' Menteri Besar in this House to diversify the State Government's revenue and income, including ensuring that the subsidiaries and agencies of the State Government pay dividends to the State Government. Five companies, zero dividends. Then that's it. I want to finish this.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Minta penjelasan.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Wait, I will explain, be patient. By 2028, based on the same slide, the dividends to be paid by these five companies are estimated to total RM122.1 million. I want an explanation from the State Government on the source and capacity of MBI, especially these five companies, to pay dividends, and as estimated, they will certainly sell more land. But if this is the trend of the State Government, the trend of the State Government's subsidiary. The Dato' Menteri Besar's aspiration to take proactive and more innovative action will not be achieved. I want to ask which land MBI wants to sell next. As an example just now, PKNS, which was the only land that was truly premium and most strategic in Broga, Semenyih, has already been let go. I want to ask where the locations of MBI's lands are, especially those of the five companies just mentioned, which will be used to generate returns with the aim of paying dividends to the State Government in 2028. Bukit Gasing, please.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you. At least there is a retreat and an effort to find a plan to improve these five companies. I was not in that retreat either. Let us wait for the Menteri Besar to give an explanation. But I want to ask the Honourable Member, during the four years when the Honourable Member was Menteri Besar, did these five companies also exist? If these five companies existed, did these five companies already exist during the time when the Honourable Member was Menteri Besar, and what was the dividend contribution of these five companies during the Honourable Member's four years as Menteri Besar? Not just one year.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

This is really Bukit Gasing's way. This government failed; what did you do back then? That is not the way of a responsible Member of the House, we may have some limitation. Perhaps the circumstances at that time did not have AI. I have actually answered that question in many sittings to Bukit Gasing. I have taken several actions to ensure

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

This is not about AI. This is specific to the five companies, because the Honourable Member raised these five companies.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

No, wait, let me answer. I have said that back then I took more proactive action to introduce several solutions or remedies using technology and new innovation, because we can't be over dependent on premium land, land revenue. At least that is a good start. But if you want to compare that time, that was ten years ago, with now, of course there is a difference. The Honourable Member himself said just now that the size of the economy should continue to grow, but you cannot use that argument: I failed before, you succeeded today. Yes, if you succeed, I acknowledge it. But whether that success still depends on land. Was it wrong for me to pose that question? Thank you, Bukit Gasing, who is nodding, agreeing with me, yes.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Banyak.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

I am not giving any more time.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Not giving any more.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

I'm not, that's enough.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Kenapa.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

He is actually using this to campaign for DAP, sit down.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

DAP is not contesting against the Menteri Besar.

Deputy SpeakerEN

Bukit Gasing, sit down. Hulu Kelang is not giving space.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Bukit Gasing, which group? I do not want to mention that name. Alright, that is why, Mr Speaker, these matters should not be taken personally or taken to heart, because I bring many documents, I study them carefully, I check them, because I know this honourable House, let us debate, yes, perhaps we make some jokes or tease a little, because the time is 2.30 in the afternoon, and Speaker, that is not a very pleasant time for debating because everyone is not listening attentively, so I have to joke a little, but my facts, my data, remain in front of me for the sake of this House. Then, I also want to invite the Dato' Menteri Besar and the State Government to pay attention to the contribution of the construction sector. At the start of my debate, I said the contribution of the construction sector to Selangor's economy is only 4.9%. 4.9%. So I want to ask why the construction sector's contribution has shrunk. Is it because PKNS has failed to build affordable houses?

I already received an answer from the State Government yesterday. Very latest, Mr Speaker, the State Government informed me in writing yesterday that for the whole of 2024, there was no Rumah Selangorku project completed, built or launched by PKNS. What is happening to PKNS? Throughout 2024, not a single unit was completed and not a single project was launched. Because PKNS today prefers to sell land. Acting as an agent selling land at a price far lower than the Valuation Department. Where are our attitude and stance? This is the State Government's answer. So if PKNS is not involved, much less to support the pillar launched by the Dato' Menteri Besar of Selangor, namely looking after people's welfare by building 200,000 units of Rumah Selangorku. Within five years, if PKNS is not involved and does not build, they want to hand it over to the private sector simply for the sake of it.

We must discuss this matter seriously. That is also my view. The sluggishness of the construction sector in Selangor is also because the State Government failed to achieve the targets set. Here it is, a great document, in RS-1 (Rancangan Selangor Satu), but yesterday I did not hear a single word about RS-1. Why? Has it been buried? Has it failed? If this is a major agenda of the State Government that could drive growth and inject development, why is there not a single word about RS-1? When I returned, I checked, and only then did I learn why. This is one of the drivers of change: the 7 economic development zones of Selangor, the Maritime Gateway. What are the results by 2023? This is not my document. This is a document that Pelabuhan Klang supports, supports very enthusiastically.

By 2023, Pelabuhan Klang, this is 2025, yes. By 2023, development of 50% of the total number of affordable housing units on land of 234 acres. By 2023, Pelabuhan Klang should have been proud to see 50% of the total number of affordable housing units on land of 234 acres. Today, not even a single pole is there, after three years. So the construction sector will be sluggish. Roads are full of potholes and craters, this is what I want to ask the State Financial Officer, is he gone or not. Because I am tired of talking to this Menteri Besar. So I want to speak only to the State Financial Officer now. If possible, Dato' SS, is he not here either. If possible, the Dato' Menteri Besar. I think I want to speak with Pelabuhan Klang, is he ready to become a State EXCO. Mr Speaker, he always debates for only 5 minutes. Today, one hour. Then we want to ask for his interruption to give space. Yes, yesterday he contacted us, you ask this, you ask that.

Deputy SpeakerEN

Hulu Kelang, Hulu Kelang has also been almost one hour, you know. Can you please summarise?

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Not yet. Earlier the Speaker said he could go a little longer.

Deputy SpeakerEN

Earlier it should have been only half an hour, yes.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Today the Speaker is more lenient than the DEPUTY SPEAKER.

Deputy SpeakerEN

Now it is almost one hour, can we summarise.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu Kelang

Sikit lagi.

Deputy SpeakerEN

Focus on the issues.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

I will help in Bukit Antarabangsa, because I heard Tengku Zafrul wants to go there. That is my village. So give me 15 more minutes, Mr Speaker.

Deputy SpeakerEN

Okay, exactly 15 minutes only. Summarise.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Confirmed winner of Bukit Antarabangsa. Mr Speaker, I was only joking. I would like to request that the State Government, perhaps with the support of the Dato' State Secretary and the State Government officers, consider this. I have asked in this House before: the cash reserves and developer contributions in the local authorities (PBT) in Selangor are huge. But at the same time we hear the complaints of the people on the ground. Rubbish is not collected, roads are bumpy and full of potholes, and there is no proper maintenance. Everywhere. But the PBT also face financial constraints. I do not blame the Yang Dipertua, I do not blame the Mayor, I do not blame the government officers. I want the State Government to give a direction, a course of action on how we can help the PBT, especially those whose revenue is low. Compared with Petaling Jaya, Subang Jaya, Shah Alam and Klang, perhaps their numbers are large. I have the records here.

Gentlemen, Honourable Members, Mr Speaker, the cash reserves of the local authorities in the state of Selangor in 2024, up to October only and not yet to December, total 2.6 billion ringgit in cash reserves alone. Just cash reserves. Likewise, the development charges are 1.4 billion ringgit. That means if we combine the development charges with the cash reserves alone, we already have 4 billion ringgit. Once again, saving for what? Yet the core business of the PBT is to provide services to taxpayers, not to keep saving, saving, saving and collecting interest. Release part of these cash assets to upgrade playgrounds, repair drains, collect rubbish, so that the burden does not fall on the State Government alone. Some PBT cannot afford it, so the State Government can channel some funds to them, but for PBT that have the capacity, a more innovative way of providing services to the people must be considered. That is just the cash reserves. I want to point out the landholdings of the PBT in Selangor. The current market value in 2024 for MBSA alone, yes, Kota Anggerik, is 1.4 billion ringgit. That is the landholding of just one PBT. Majlis Bandaraya Subang Jaya, sorry, 267 million; Majlis Bandaraya Petaling Jaya, 231 million; Majlis Bandaraya Diraja Klang, 282 million, hundreds of millions. But when it comes to collecting rubbish, there is not enough money; when it comes to repairing drains, there are not enough funds; there is no allocation. There is no special allocation from the State Government for collapsed embankments, so I appeal to the Dato' Menteri Besar and the State Financial Officer to look for more innovative approaches to help the PBT across the whole of Selangor.

One more matter I want to raise, Mr Speaker. On page 17 of the royal address of His Royal Highness Tuanku Sultan. Allow me to read a little: "Mr Speaker, We have commanded the JAIS to supervise and improve the system of tahfiz schools in this state. We want the physical condition, facilities, buildings and hostels of these tahfiz schools to be equipped with recognised safety aspects, and fire-prevention equipment must also be in good condition and approved by the Fire Department. Tahfiz schools that are not registered and do not meet the requirements shall be closed." This is a royal command that must be given serious attention by the State Government and also several agencies involved, especially the Health Department, the Fire Department and the PBT. But for the information of Seri Setia, while we support the royal advice of Tuanku that these tahfiz schools must be registered, and of course in accordance with specifications and meeting the requirements, we support it. But the problem is that there are parties who try to delay it, even though the Health Department has given its approval and the Fire Department has given its approval, Seri Setia, please check. Certain PBT, especially in the city areas, are delaying these approvals. I want to know who. And I am confident it is not the Mayor, not the YDP, but is there an element of councillors trying to block the registration of tahfiz schools, especially in Petaling Jaya and especially in Subang Jaya, to the extent that these applications have been postponed for such a long time. Do not take this matter lightly. We must check how many have submitted applications? How many have been approved by the Fire Department and the Health Department? And investigate any PBT that has not yet, or is still delaying, these approvals.

Mr Speaker, I also see the matter being discussed, namely the sale of the Ehsan Rahmah JER, but Pelabuhan Klang, JER cannot solve the food security problem in Selangor. This morning Pelabuhan Klang was shouting that 7 million Selangor people benefit from JER, through a subsidy of RM12 million, Dusun Tua, clap pom pom pom. Pelabuhan Klang, if the subsidy is 12 million ringgit and it benefits 7 million people, each Selangor person gets RM1.70. You are being fooled. Come on, if you want to help for real, what is RM1.70? There are 4 billion in reserves. If it's a ceramah in Sungai Tua, 4.1 billion, JER gets RM1.70. This is politics from 40 years ago. That is why today the people of Selangor are ready to support Perikatan Nasional in the coming general election. When I met Chinese businesspeople recently, Seri Serdang was jealous, saying, look, the Secretary-General of Perikatan Nasional is already pleading with non-Malays. Yes, we are a party that will form the government, of course we protect the rights of all the people in the state of Selangor and our country. Malay children are my children (uproar), Chinese children are my children. Indian children are my children. Iban and Dayak children are my children. Remember Kota Anggerik? (uproar). These are all our children (Chinese language). So do not provoke me. I want to unite everyone, that is also the royal command. We want this unity to be an asset so that Selangor continues to move forward.

There are just 2 more matters, Mr Speaker. I will take only a little time. Tuanku has commanded that the civil service in Selangor must carry out its responsibilities with full integrity, efficiency and competitiveness. I want to draw the attention of the State Government to the role and efficiency of KUSEL, Koridor Utiliti Selangor (Selangor Utilities Corridor). In granting approvals to carry out utility works, I receive many complaints that the process taken by KUSEL is too long. There is a lot of bureaucracy, apart from the excessive costs borne by applicants. Let me give an example, the Bukit Antarabangsa Mosque. It is not in my area, it is in the Deputy Speaker's area, but because we have a good and close relationship, I tried to help him. This mosque has applied since October 2024 to install a TNB utility of only 274 metres, Seri Setia, not 2 kilometres, 274 metres, for the benefit of the mosque. It has still not been approved after months. In the past we could send it to MPAJ and the problem would be solved. I understand KUSEL is for mapping, and I support that goal, but mapping upon mapping, mapping upon mapping, even to install 200 metres of cable takes months. Where is the efficiency? I ask Seri Setia to please help, because this JAIS letter is about sin if it is delayed during Ramadan.

Deputy SpeakerEN

Hulu Kelang, thank you. But can you summarise?

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Yes, Mr Speaker. This is the benefit to the community. Bukit Antarabangsa

Deputy SpeakerEN

I already added time earlier.

Dato' Seri Mohamed Azmin Bin AliBERSATU · PNHulu KelangEN

Mr Speaker, I feel more comfortable in Bukit Antarabangsa, which has strong support as a result of our joint cooperation. Finally, Mr Speaker, I want to ask Seri Setia one more thing. What is the status of the construction of the Islah Complex, the Kompleks Islam Al-Islah, in Taman Seri Keramat here? When I was in the Federal Government, I gave 1 million ringgit. I gave 1 million, and then recently the ICU withdrew it, everything I had approved was withdrawn. This is the Menteri Besar's area, Seri Setia. Take care! From now on Seri Setia is going to take over, so you must look after it carefully. I don't know whether it's Seri Setia or Kota Anggerik, it's up to you. But I support both of them, my friends. Pelabuhan Klang can wait. I ask that, since the ICU has withdrawn, the responsibility for the mosque is the responsibility of the state. Islamic institutions are the responsibility of the state, and the land has been gazetted in the name of the Islamic institution. So I hope the State Government can provide an urgent allocation to start the first phase of development, namely the mosque, which is an important component of the Kompleks Islam Al-Islah in Taman Seri Keramat, Hulu Kelang. So with these words, I express my thanks to Mr Speaker, who is very wise and has given this space. My intention is only one, to see Selangor continue to progress for the people of the state of Selangor, as commanded by Tuanku. Insya-Allah, if there is anything needed from us, we are ready to give advice. If necessary, we will need to wind up the debate, to conclude the debate at the scheduled time later. Thank you, Mr Speaker.

Deputy SpeakerEN

Thank you, Honourable Hulu Kelang. Now it is the turn of Honourable Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

Thank you to Mr Speaker for allowing Seri Kembangan to take part in the debate. I have to cut a little so that it is a bit shorter. Taman Medan, are you going to debate? Wait a moment. I feel very proud and happy as a representative of the people of the State of Selangor, because His Royal Highness the Sultan of Selangor places great importance on unity, harmony and the well-being of the people. In the royal address of His Majesty yesterday, the first command was that relations among the people must continue to be strengthened and kept away from those who divide them because of political interests and differences of race and religion. Unfortunately, while His Majesty was issuing the command, there were a handful of individuals with hidden agendas spreading hatred on social media on the pretext of strengthening the Malay language and using bilingual signboards in several Kampung Baru areas as examples, and they incite the public to make reports and cause panic and chaos.

These individuals seem unable to accept other languages and races. They are more inclined to create hatred and fear rather than harmony and well-being. They use radical approaches to ensure society is in a state of fear and anxiety. If we look at their social media, we will find that most of them do not show their real identity. All the information on their social media is fabricated: fake names, fake pictures, false information, and the things they claim are also not true. What is true is only hatred and evil intent towards other people, especially other languages and races. The replies under these posts are also mostly made by fake accounts. Although there are some genuine accounts, we will find that they are not people from Selangor. Their location settings originate from outside Selangor, yet they try to spark racial division in Selangor, destroying the spiritual well-being and harmony among races in Selangor and preventing us from uniting. The purpose of them doing this is because we all know that if we are united, the whole of Selangor can focus on economic development. Everyone's life will be better, and economic prosperity will bring better development in education, culture and the standard of living in Selangor.

The Selangor Government has proven in 2023 that we not only improve our lives, but the Selangor Government also contributed 25.9 per cent of Malaysia's economic output, which cannot be compared with other states. These irresponsible individuals do not take Selangor as an example and strive to contribute to making Malaysia better, but they try to destroy the progress, harmony and peace of Selangor. They even want to make Selangor and the whole of Malaysia a place that is backward, left behind, in chaos and full of hatred between races. We firmly condemn these extremist groups, and we will try our utmost to obey the command of His Royal Highness the Sultan of Selangor and to devise more good policies to promote harmony and mutual understanding among races, and to lead all the people of Malaysia and the people of Selangor to advance this state through the approach of Kita Selangor Maju Bersama, where all the people can enjoy prosperity, keeping Selangor as a leader in politics, economy, culture and education in Malaysia. Please.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

I was interested in the earlier argument of Seri Kembangan, but I want Seri Kembangan also to be aware and to remember the royal address of Tuanku in the speech of 19 November 2018, not 11 December, in which the Sultan of Selangor himself ordered that the Chinese-language signboards be removed, because this had to follow the rules of Dewan Bahasa dan Pustaka. So, just now the Honourable Member raised it as if this had happened in the State of Selangor, whereas indeed this is the policy of Tuanku's command in this House. So we must be careful about what we want to raise, firstly.

Secondly, the matter of unity and the occurrence of disharmony in the State of Selangor was raised. I want to ask the Honourable Seri Kembangan, where? In which areas do Malays, Chinese and Indians feel that life is unsafe, that this disharmony exists? Because it is very bad for a Member of this House to insinuate, as if using Tuanku's royal address, which very much calls for unity, while at the same time trying to create subtle barbs and bad prejudices like this, because I feel it is not good for the State of Selangor. Moreover, the Honourable Seri Kembangan is a Member of this House, so for him to raise matters like this... Because I myself am a true son of Selangor, born in Selangor, living in Selangor, schooled in Selangor, and have never felt that way. In fact I have many friends among the Chinese, many friends among the Indians; we can sit and eat together, we can send our children to school together, and no issues or problems arise. I dare say in this House, I have many Chinese and Indian friends, and they can drink alcohol in front of me, but there is no problem. So, I want to understand where the Honourable Seri Kembangan says this is happening. As if it were happening in the State of Selangor. So please explain to the House.

Puan Wong Siew KiDAP · PHSeri KembanganEN

Thank you. I will answer the question briefly. For me, I do understand and I am indeed aware of Tuanku's royal address in 2018. That is one thing, and it is also what was mentioned on social media concerning Tuanku's royal address. Unfortunately, what I feel is improper is that these groups try to use Tuanku's royal address to spread all kinds of nonsense. For me, we all here know, and all Selangor also knows, that the position of the Malay language is very important, and we all acknowledge and we all follow that royal address. But what I feel they should not have done is use the wrong example, that the picture they posted, the picture they took, is actually a picture that is bilingual. Malay and also Chinese are on top in that picture. So in my view there is no problem, and I think...

Seri Kembangan.

Deputy SpeakerEN

Seri Kembangan, stand up, give way.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

On the signboard issue just now, what I understood from what Seri Kembangan said is, yes, we admit that at that time Tuanku's royal address seemed to, Tuanku himself asked for the signboard to be taken down, not in keeping with the policy of the State Government of Selangor. But what I understood from the argument of Seri Kembangan is this. The problem is that there are parties who exploit that issue for their own personal political interests. This is the problem. This is what I understood from what Seri Kembangan said. It is not that Seri Kembangan wants to go against Tuanku's royal address. But there are parties who have no capital, who have no ideas, who want political interests alone and who end up exploiting that issue.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

It is Seri Kembangan who is exploiting this issue. It is Seri Kembangan who brought this issue into this House. It is Seri Kembangan who is exploiting this issue.

Puan Wong Siew KiDAP · PHSeri KembanganEN

I give way to Seri Serdang. I give way to Seri Serdang, not to anyone else.

Deputy SpeakerEN

Taman Medan. The floor is for Seri Serdang, Taman Medan.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

What I understand is that what Seri Kembangan said is that he is loyal, all of us are loyal and obedient to Tuanku's royal address. What has happened is

(House in uproar)

Deputy SpeakerEN

Taman Medan. Taman Medan, please sit down, Taman Medan. This floor has been given to Seri Serdang. Please, Seri Serdang, if you still have more.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

So, I ask Seri Kembangan whether he agrees or not with what I understood to be the argument of Seri Kembangan?

Puan Wong Siew KiDAP · PHSeri KembanganEN

I very much agree. Thank you, Seri Serdang.

I request the floor from Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

I do not give way. Sorry.

Seri Kembangan, may I ask

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Speaker, Taman Medan has made a very serious accusation. He has accused Seri Kembangan of being racist. I ask him to withdraw it.

Seri Kembangan, may I request the floor?

Deputy SpeakerEN

What is this, is it a Standing Order matter or what do you want to raise?

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Yes. A Standing Order matter.

Deputy SpeakerEN

Please, the explanation from

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Thank you, Mr Speaker, for giving me the chance to clarify. We heard the speech from Seri Kembangan just now. Nobody raised the signboard, nobody raised this issue outside. Suddenly Seri Kembangan hijacked this issue in the House, then tried to portray as if racial unrest had occurred in the State of Selangor, as if disharmony had occurred, when that has not happened. Selangor is the melting port of Malaysia. Malays, Chinese and Indians have lived for generations, in peace and harmony, in this State of Selangor.

Deputy SpeakerEN

Taman Medan, I only ask for an explanation as to whether Taman Medan..

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

That is why, in my view, his statement is the one that is truly racist. That should not be said in this House.

Deputy SpeakerEN

Taman Medan, let the Speaker speak first. Taman Medan, did Taman Medan utter the word racist?

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

I said it. I did say it, because in my view that statement is racist. That statement should not be said in this House.

Deputy SpeakerEN

In my opinion, the speech by Seri Kembangan contains no racism, so I ask that, if possible, Taman Medan withdraw the remark.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

No, I do not understand why we can so easily accept something like this being brought into the House, insinuating like this..

Deputy SpeakerEN

Taman Medan, we want to continue the debate. We, the way, Taman Medan, we want to continue the debate, your way of asking to withdraw the word racist.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Yes, that is right. That is what we want. We do not want to hear sentiment or rhetoric like this in the House.

Deputy SpeakerEN

I ask Taman Medan to withdraw the word racist just now so that we can proceed with the debate.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Because I want to debate after this, never mind, I withdraw it. Thank you, Deputy Speaker.

Seri Kembangan may ask for a little room, just a little.

(Chamber in uproar)

Puan Wong Siew KiDAP · PHSeri KembanganEN

Sorry, because.

Deputy SpeakerEN

Seri Kembangan does not give room to others. Continue, Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

If I am given too long, it will never end. I express my gratitude for the Royal Address of His Royal Highness the Ruler regarding environmental sustainability. In order to reduce waste materials that will end up at the rubbish disposal site, the Selangor State Government will provide one hundred recycling points in the major housing estates in every Local Authority (PBT) area. I welcome this effort and would like to offer a few suggestions for the consideration of the State Government. Compared with residential areas, markets and food courts produce more waste. Although the volume of this waste is very large, in fact it is easier to process and recycle because most of it is food waste.

Every day, one public market can produce more than two tonnes of food waste, depending on the size of the public market. Data from KDEB shows that in the month of Ramadan in 2024, a total of 139,361.61 tonnes of food waste was produced and, on average, every day during that Ramadan month, the people of Selangor produced 4,805.57 tonnes of food waste. Imagine all this food waste not needing to be sent to the solid waste disposal site, when it could be processed to produce environmentally friendly organic fertiliser and grow organic fruits and vegetables.

I would like to propose that the Selangor State Government donate large-sized food waste composting machines to public markets and ensure that these food waste composting machines become a must-have facility in every new market and food court. These food waste composting machines will not only reduce the amount of waste disposed of at the rubbish disposal site; the organic fertiliser produced can be sold and generate additional income for the PBT or the public market management as well. I propose that the Government consider taking action to ensure new markets install food waste composting machines, not only for the purpose of environmental protection and profiting from the sale of organic fertiliser, but this step can also drive technological development in Malaysia, especially in Selangor. We do not need to buy food waste composting machines from overseas because in Taman Equine Selangor there are already local companies and factories producing food waste composting machines.

If the Government considers this proposal before we aspire to achieve the zero waste vision, with permission, I feel it is practical if we start from zero food waste, with permission. I also hope the Government can give priority to collaborating with local technology companies to benefit the people of the Government and also local entrepreneurs.

I would also like to touch on the issue of odour pollution that has occurred for years in the areas of the Seri Kembangan and Balakong state constituencies (DUN). Since I was given the opportunity and elected as a people's representative in 2018 until now, I have received complaints about frequent odour pollution, but our side and the local authority have not been able to trace the source of the chemical odour. In July 2024 I received a complaint from residents stating that a factory adjacent to their residential area had been releasing chemical-smelling gas frequently for years, but their complaints did not receive a response from any party. The factory also operated until late at night and produced noise pollution. I would like to give credit to the Subang Jaya City Council (MBSJ), because it carried out an efficient and efficient investigation. Efficient and quick within a short time, but what was disappointing was that the factory filed a judicial review application at the Shah Alam High Court on 18/10/2024 together with an application for an injunction to

prevent MBSJ from enforcing the notices that had been issued. According to feedback from the Department of Environment, the factory submitted a notification for air pollution control equipment to the Department of Environment on 17/12/2024 and is in the process of appointing consultants. Noise of installing the Noise Barrier, with permission. The period for installing the air pollution control system and Noise Barrier is 3 months. This shows slight progress, although the factory only acted after 5 months from the complaint being received and the investigation being carried out. What is not satisfactory is that the period to stop this pollution is too long, and the factory still produces this pollution every day after the complaint was made. Investigation carried out. Notice given and action taken. The arrogant attitude of the factory is as if their side is protected by a greater power. And health, justice and the voice of the people are ignored. Who is protecting this factory such that they continue to disregard the reprimands and actions from the Local Authority? They should, as long as they have not installed air pollution control equipment and a Noise Barrier, stop operating because they have been proven to cause pollution. In my view, the acts and policies to address odour pollution are not sufficient to show the government's firmness in protecting the environment. I hope the Selangor State Government can cooperate with the Federal Government, especially the Department of Environment, to formulate policies and acts on this matter in order to stop such pollution from happening in the future. I also welcome the proposal from the Ministry of Housing and Local Government to implement Community Service Orders of up to 12 hours for minor littering offences through an amendment to the Solid Waste and Public Cleansing Management Act 2007. Act 672. Street, Drainage and Building Act 1974, Act 133. After the amendment, if the individual concerned fails to comply with the Order, a fine of RM2,000 to RM10,000 may be imposed, compared with the existing penalty which only provides for a fine of RM500 to RM2,000 or imprisonment of up to one year. I hope the Local Authority can cooperate with the Federal Government and implement this order actively to achieve a safer and cleaner Selangor. Seri Kembangan also wants to

Deputy SpeakerEN

Seri Kembangan, please summarise, yes.

Puan Wong Siew KiDAP · PHSeri KembanganEN

There is still a lot more. I will try to speed up, yes. Seri Kembangan would like to extend congratulations to the government for presenting the Selangor Climate Change Policy. A comprehensive document that outlines the Selangor State's approach in facing the impacts of climate change, which is also a global challenge across various sectors and levels. As far as I know, the Selangor State Government is the first state government to introduce a Climate Change Policy in the whole of Malaysia. This policy gives attention to the balance between economic development and environmental conservation. Accompanying the implementation of the Selangor Climate Change Policy, the Selangor State Climate Change Adaptation Centre has been established to ensure that the Selangor State Government is ready to face the increasingly significant challenges of climate change. With erratic weather, rising temperatures, flash floods, and threats to water resources and biodiversity, Selangor needs a specialised centre that can coordinate adaptation and mitigation efforts comprehensively. I would also like to touch on the topic of Visit Selangor Year 2025 as this is indeed an important project for this year, and His Royal Highness the Sultan of Selangor also mentioned this topic in His Royal Address. Seri Kembangan welcomes the launch of the official mascot of Visit Selangor Year 2025, namely Spark. There is also one downstairs in the hall. The launch of the Digital Portal for the "We See Selangor 2025" Campaign. For the information of the Honourable Members, Seri Kembangan has launched the Seri Kembangan mascot, namely Blink-Blink, on 8/2/2025. Besides that, we have also introduced several collaboration plans to enable the private sector to get involved and advance Visit Selangor Year, and contribute their efforts and creativity. I very much look forward to collaboration between Spark and Blink-Blink so that more interesting programmes can be held. In the Royal Address of His Royal Highness the Sultan of Selangor, His Royal Highness emphasised that the existing tourism infrastructure facilities need to be improved. Seri Kembangan strongly agrees and I would like to propose that, besides existing tourism infrastructure facilities, performance licences, entertainment licences and temporary licences need to be provided to foster the development of several services or jobs related to the tourism sector.

I'd like to interject a little.

Puan Wong Siew KiDAP · PHSeri KembanganEN

I can't even let you speak. Sorry, Honourable Member.

Let Seri Kembangan have a little, I have been asking for a long time.

Deputy SpeakerEN

Seri Kembangan, I ask you to give your closing remarks. Straight to the ending. I will give you just one more minute, Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

Sorry, Honourable Member. Last one.

Seri Kembangan, this is important, Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

I would like to give several examples as suggestions for my elaboration. When we travel to tourist places, we can see many creative industries such as street art performances. Performers who wear mascots and pose for photographs with tourists and so on. In addition, Handicraft Entrepreneurs can also sell their handmade products by operating mobile stalls at various tourist destinations. These parties cannot get involved and contribute to Visit Selangor Year because they do not have the relevant licences. The existing administrative system only issues annual licences which lack flexibility, whereas this flexibility is what attracts such performances and stalls. Besides that, it has been found that entertainment licences for commercial areas are difficult to obtain. Many restaurants want to provide live music performances, but because such performances require an entertainment licence, and applications for entertainment licences sometimes take several months, up to a year, to be resolved. Approval is not necessarily granted either. Therefore, these restaurants cannot provide such performances to attract tourists. I recommend that the Selangor State Government study the licences concerned: if the relevant licences can be granted and the application process can be simplified, I believe Selangor's tourism attractions will increase significantly. With this, I thank you and humbly move to support the motion. I thank His Royal Highness the Sultan of Selangor. Thank you.

Deputy SpeakerEN

Thank you, Honourable Seri Kembangan. Honourable Members all, as the business of this House is still lengthy, the sitting today needs to be extended in order to continue the business of the House. I invite the representative of the Menteri Besar, YAB, to move this motion.

Dato’ Ng Suee LimDAP · PHSekinchanEN

Mr Speaker and Honourable Members all, I would like to move a motion which reads as follows: Whereas the House sitting today, under Standing Orders 11 and 26 (4) of the Standing Orders of the Selangor State Legislative Assembly, shall be extended until 5.00 p.m.

Datuk Rizam Bin IsmailUMNO · BNSungai Air Tawar

Saya menyokong.

Deputy SpeakerEN

Honourable Members all, this motion has been seconded. I put it to Honourable Members for their agreement. Those who agree, please say YES. Those who do not agree, please say NO. The motion is agreed. I appoint the Honourable Taman Medan to continue the debate.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Thank you to the Deputy Speaker. Assalamualaikum wrt. Salam sejahtera. Good afternoon. In upholding the command of His Majesty on the occasion of the first meeting of the opening of the third session of the 15th Selangor State Legislative Assembly (DUN), allow me to record two pantun.

Bunga Melur harum mewangi, Tumbuh mekar di tepi titi, Titah Tuanku junjung tinggi, Demi rakyat terus berbakti.

Daun selasih di tepi bendang Hijau segar di pagi hari Negeri makmur rakyat pun senang Andai adil pemerintah negeri

Honourable Mr Speaker, and fellow respected Members of this House, I humbly thank His Royal Highness Tuanku for the command, which is full of wisdom and sagacity. His Majesty's command clearly gave a reminder to the State Government to administer with trustworthiness, effectiveness and a people-centred spirit. Indeed, His Royal Highness has taken the trouble to convey personal views as advice and an important rebuke to the leadership of the Menteri Besar and the administrative team here in Shah Alam. Indeed, most of that reminder is what we in the Perikatan Nasional bench have raised throughout this session in this august House. Honourable Mr Speaker, I would like to draw the attention of Members of the House. This concerns the issue of rubbish in the State of Selangor. This is at Flat Medan Jaya in Taman Medan, this morning. Here is another one at Medan Cahaya. Sekinchan, please look, Sekinchan. Please take note, yes. Thank you, yes. Sekinchan rarely sits through my speech. Here is one more, the issue of rubbish in the State of Selangor. I want to stress that the issue of waste management and cleanliness in Selangor has reached a very worrying level. Based on the latest report, Selangor produces nearly 7,000 tonnes of rubbish a day, making it the state with the highest volume of solid waste in Malaysia. Unfortunately, waste management in this state remains weak, with more than 30% of rubbish not collected according to the stipulated schedule. The people in the towns and rural areas complain by telephone to the Representatives, by telephone to the Council Members, about heaps of rubbish that are poorly managed. The foul smell pollutes the environment. Even in my area of Taman Medan, they say, "Tak pe lah YB. Dah nasib kami hidup macam ni." To such an extent have they accepted this weakness and made it something that happens commonly. It has become the norm for us in the State of Selangor. This is very saddening. Indeed, this has already been rebuked in His Majesty's command yesterday. Is the State Government still asleep? Sleeping and not seeing how dirty certain areas in this state are? If basic problems such as rubbish cannot be solved efficiently, how can the people have confidence in the State Government's ability to manage bigger issues? The failure of enforcement on this rubbish issue is very shameful. Studies show that more than 500 illegal rubbish dumping sites have been identified across Selangor, but the action taken by the responsible parties remains lax and inconsistent. The local authorities (PBT) have failed to control cleaning contractors who carry out their duties carelessly. Even in areas such as my constituency of Taman Medan in Klang, Kajang and Ampang, which recorded high complaints about rubbish not being collected according to schedule. More than 40% of complaints to the local authorities in Selangor relate to cleanliness and waste management issues. I appeal to Honourable Sekinchan. Please go down to the ground. I have invited Sekinchan to come to Taman Medan for a long time already. I miss walking with Sekinchan. It used to be common. But Sekinchan doesn't seem keen to walk with Taman Medan. Please come to Petaling Jaya. To Taman Medan. This is a city. If we have Shah Alam City, Petaling Jaya City is important, and I believe my colleagues from Petaling Jaya also agree on this rubbish issue, but I want to say Taman Medan is the most affected. I ask Honourable Sekinchan to please come and go down to the ground. I am confident that if Honourable Sekinchan comes down to the ground, wow, all the problems will be solved.

Next, Honourable Deputy Speaker, on the issue of implementing a stable and pollution-free water supply in the State of Selangor. Until today we still hear media reports and reports on social media about what the people of Selangor complain of, having to face recurring water disruptions due to river pollution and weak maintenance of water treatment plants. Recently, the river water turned blue, if I am not mistaken. This is what has happened in the State of Selangor. We have repeatedly heard the State Government's promises to address this problem, but the reality is the same problems keep recurring. Our monitoring system and our enforcement, if they were truly efficient, why is pollution still occurring? That is why I urge the State Government to learn from these mistakes. Do not give light punishments to this industrial sector; there must be stricter monitoring, there must be a more orderly and more efficient long-term plan, and I call on the State Government to immediately implement a real-time monitoring system using modern technology so that pollution can be prevented before it occurs. His Majesty, in His command, expressed sorrow over the condition of the rivers in Selangor that remain polluted due to industrial activities and the irresponsible attitude of a handful of these industrial "scoundrels." Where is the effectiveness of the green policy that we keep promoting? If we are truly serious about protecting environmental sustainability, why are the laws still lax and why is enforcement still weak? Albert Einstein once said, listen carefully, "The world will not be destroyed by those who do evil, but by those who watch them without doing anything." Meaning, for Port Klang, the world will not be destroyed because of the wickedness of evil people, but because of those who watch that wickedness without doing anything. The State Government needs to stop the rhetoric and begin acting. Factories that pollute the rivers must be subjected to stronger action, not just light fines that can be paid so easily.

Deputy SpeakerEN

Subang Jaya rises.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman Medan

Ya.

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Taman Medan, I want to ask whether what was said about Taman Medan is based on facts. If we go by last year, I cannot say there was no pollution; there were 70 cases that could be detected, but because of disruptions there were 3, and all three of them were less than 48 hours. I, the ADN for Subang Jaya, am entitled to state that the State Government has made many improvements, because in 2018 and 2019, when I became ADN, I once had nine water disruptions in my state constituency. But since then, for three years, Subang Jaya has never experienced a water disruption, so this means the enforcement actions, legal improvements and increase in staff have been effective, Honourable.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Subang Jaya only, Honourable. We need to look at the whole State, first. Second, I mentioned earlier that we support the efforts of the State Government. I am not saying that this thing has not happened; it still happens, and even the dumping of rubbish into rivers still happens. Our committee went to visit the Klang River and saw how much rubbish was collected from the Klang River; there is still a lot, and this still happens because of the attitude of a handful of residents, a handful of industry players, people doing business along the riverbanks. In fact, I myself once asked a question, and the Honourable EXCO has not yet answered, on whether we are making a new policy to preserve this river, so that no development at all is permitted along the riverbank. This is what we want to know; this is what we need a plan for from now on. I understand well that there is enforcement and there are monitors, but this thing can happen in an instant, and it can continue to happen if we do not truly resolve this thing from "the root cause from this problem," I mean. Thank you, Honourable Subang Jaya.

I will continue on health infrastructure and public hospitals. I thank His Royal Highness Tuanku for his concern, who has commanded the need to renew and improve health facilities, especially hospitals and health centres in the State of Selangor. The worrying fact for us in the State of Selangor is that government hospitals in the State of Selangor are experiencing critical congestion, with bed usage exceeding 85%. The number of doctors and nurses in Selangor is still insufficient compared to population density. In Selangor, it is somewhat unique: not only in rural areas, but even in densely populated city areas such as Petaling Jaya, there is still a shortage of public health centres, causing the people to have to travel far to obtain treatment. Today I am very happy that Bukit Gasing, though somewhat late, has finally supported the proposal that I raised more than six months ago, to build a new hospital in Petaling Jaya to accommodate the increasing population density in Petaling Jaya City. I want to take a proactive step by proposing to the Honourable EXCO, the State Government and the State Health Department to consider one building, namely the UiTM Jalan Othman campus in PJ Old Town, which could be considered, proposed to be converted into a public hospital, since this campus is not being used at the moment. A discussion and intervention plan needs to be started if this effort is to be implemented. I believe this step will be more cost-effective, especially in Petaling Jaya City, which we know has expensive land but a large population. We have buildings like this in Petaling Jaya, and I am confident that the Honourable Bukit Gasing, Kampung Tunku and Bandar Utama can also propose other buildings to be considered for conversion from being unoptimised now to being used as health facilities in the State of Selangor. Let Selangor be the driver and catalyst of this reform. Let us not, with old thinking, go looking for land and building construction, looking for land and building construction that is not finished even after 20 years, stuck in the Malaysia Plans endlessly. The Selangor Twentieth Plan has not even been completed yet. Let us look for something more effective and easier to implement, and I am confident that if this can be implemented, Selangor will be able to solve this congestion problem. Selangor will be able to provide better public health services to the people of the State of Selangor, and I, Taman Medan, fully support it if the State Government takes this initiative to begin discussions with the Federal Government.

Honourable Deputy Speaker, I would like to touch briefly on the issue of implementing the Kita Selangor initiative. I stand here not merely to honour His Majesty's command, but also to voice the anxiety of the people who continue to face various challenges, especially in obtaining benefits from the State Government's initiatives under the Kita Selangor framework. In 2023, the State Government announced more than RM200 million allocated for various initiatives under Kita Selangor. However, official reports show that only 65% of this allocation has reached the intended recipients. This means more than RM70 million has not been fully utilised. More than 15,000 Selangor people who are eligible to apply for the Kita Selangor cash aid have still not received it, whether due to bureaucratic processes or because of system failures in identifying them. I want to raise an important issue about this programme. First, the weakness in implementing these initiatives, which causes many people to be left behind. Second, Seri Kembangan has mentioned, Seri Serdang has mentioned, Port Klang has mentioned, Kita Selangor is meant to foster unity, to treat everyone equally and to be fair to all. But when implementing an initiative like this, whose benefits are for the people, why compare who approved the applications and who registered the applications? Why compare between the Perikatan Nasional Service Centre and the DUN Coordinator Office? I want to raise the issue of double standards. The command of His Majesty is that the State of Selangor must be united. I am not asking for the allocation to be channelled to my Service Centre, I am not asking for the allocation to be channelled to the ADNs, but I feel that we in the State of Selangor are mature enough. We once sat together; now perhaps we are on opposite sides, but we are all in this House with the same intention, in the interest of the people of the State of Selangor. Where is the good State Government initiative? Even the Leader of the Opposition often says we will support and recognise it. When we have Kita Selangor programmes that require registration at the Service Centres, what is the harm in giving us access to verify their registration? We are not asking for us to hold handover programmes; do not take photographs, just hold handover programmes, and most importantly, so that the people can have easy accessibility to obtain approval for these programmes. I telephone, indeed I have dedicated myself to the DUN Coordinator, because why am I a receptionist? They call me asking how to get BINGKAS, how to get the voucher. Indeed, the DUN Coordinator for Taman Medan gave me my allowance to pay my phone bill, please answer, because this is what is happening now: when they ask, "Can't I go to the DUN office?", I have to explain, "We want to do it, but the State Government has not yet approved it, confirm." So I ask the State Government of Selangor to take the spirit of His Majesty's command, on the basis of unity, on the basis of equality, on the basis of justice for all. Give us access; we are not asking to hold handover programmes. We can become the Government when the people choose us in the next term. Do not think that Honourable Pandan Indah will forever be the Government there.

Taman Medan gives way.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

But this is my time.

Deputy SpeakerEN

Honourable Taman Medan, you may land now, yes, please summarise, Honourable.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

So I ask that the issue of double standards not be shouted about as unity.

Taman Medan.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Wait. Do not talk about giving equality to everyone, but for something this small, surely our friends over there are not confident enough of public support that they are afraid to approve even this, for fear of losing votes. Do not be so unconfident. The people will not stop voting for Pakatan Harapan because you approved this allocation. The people do not vote for Pakatan Harapan because of many other issues.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Taman Medan wants to support this.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

So that is why I ask the State Government and the EXCO to discuss this matter as well as possible. This issue of double standards has dragged on for a long time, and our intention here is not to trouble the State Government; we want to make things easier. I feel sorry when the Honourable Bandar Utama said that the ISS registration has only reached 67,000, with the target of 100,000 in two years still not completed. Try to let us help with a campaign to resolve this matter. I will give way to Meru first.

Taman Medan, which is related to ILTIZAM Selangor Penyayang, Taman Medan is very enthusiastic about helping the State Government to serve the people, whereas just now Taman Medan showed pictures of rubbish in the Taman Medan area. As a Representative, Taman Medan should actually be able to solve it by always maintaining a relationship with the PBT and so on. For example, in my area there is a junction at Fairy Park where illegal rubbish dumping was happening, but now there is no rubbish, because I myself, together with the Council Member and the PBT, installed CCTV there, we monitor it, and this is the responsibility of a Representative, not bringing such small matters to the DUN Sitting. Thank you, do not blame the State Government. I have to take responsibility. Thank you.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Thank you, Meru. I take this spirit of Meru.

Deputy SpeakerEN

Taman Medan, I will give you only three more minutes. You have already exceeded the time.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Three minutes again. I take on the spirit of Meru. I would also like to inform the State Government that until today, all of us Members of the Perikatan Nasional, this is the issue of double standards: we are not invited to join the District Action Meeting, we are not invited to join the PBT meetings, and some were even mistakenly invited and then the meeting was cancelled, out of sheer fear. I believe they do this because they do not want any problems with political people who will make an issue of this matter, perhaps not in this House. The Council Members here, what is happening now, Sekinchan, we want to attend the meetings to raise the issue. I believe Meru installs CCTV; he does not just talk about the roadside drain, he must talk in the meeting. Is that right, Meru? Is it right or not right? Is that proposal raised in the meeting?

No, no, I have good relations with the Council Members and with the Directors at the PBT. With the PBT itself, as a Representative, although I am from the opposition, I am very confident that civil servants will provide cooperation on issues concerning the people.

Deputy SpeakerEN

Taman Medan, summarise.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Meru has settled it, so... wait a moment... so I, that is why I mentioned it, this issue of double standards is not just about approving registrations. The issue is that meetings are not called. But it's alright, we, because the people do meet us. We ask that this problem be resolved. So there is only this House to speak in. So if meetings are given, we can raise these matters. Yes, please, Kota Damansara.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Thank you, Taman Medan. I want to support Taman Medan, because on the issue, he said he wants to serve in the same way. So I suggest that Taman Medan discuss it with the Leader of the Opposition. Since the Leader of the Opposition has already become Secretary-General of Bersatu and Perikatan Nasional, discuss it with the MB and go straight into the government bloc. All government initiatives can be carried out together. (APPLAUSE). So let them be invited and so on. Because as I recall, when Taman Medan was EXCO for Penang, there was no one, the Opposition was not invited at that time. The Opposition also did not receive any allocation at that time. So discuss it directly.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

I dare to agree with Kota Damansara, on one condition: Hulu Kelang becomes the new Menteri Besar. Agree or disagree. If agree, if Kota Damansara agrees, tonight we start discussing.

Deputy SpeakerEN

Taman Medan, close. Taman Medan, land.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

Already closed. I wanted to discuss.

Deputy SpeakerEN

It's been more than 20 minutes.

Taman Medan, if it is the District Action Committee meeting, the rubbish issue, we do not bring it up. Other development issues.

Deputy SpeakerEN

Taman Medan continue, close Taman Medan.

Tuan Dr. Afif Bin BahardinBERSATU · PNTaman MedanEN

So I thank the Deputy Speaker for giving me the opportunity to debate this afternoon. Mr Speaker, I wish to emphasise that this State Government Assistance Programme must not become a political tool to favour one side alone. If we truly hold to the concepts of democracy and justice, then every citizen must receive their rights without discrimination. As said by Caliph Umar Abdul Aziz, the peace of a state lies in the justice of its leader. Therefore, if the state government truly wants to ensure the well-being of the people, be fair and just in administering this state. Including to us who are in the Opposition here. I conclude this speech, this afternoon, with a pantun:

In the jungle, the deer runs about, Crossing the river seeking shade, A just leader, the people shine, Selangor advances and the people stand firm.

Thank you.

Deputy SpeakerEN

Thank you, the Honourable Member for Taman Medan. Next, the Honourable Member for Dusun Tua.

Datuk Wira Johan Bin Abd AzizUMNO · BNDusun TuaEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, Honourable Members all, I wish to express my gratitude and deepest respect to His Royal Highness the Sultan of Selangor for the royal address (Titah) delivered at the Opening Ceremony of the Third Session of the Fifteenth Selangor State Legislative Assembly, yesterday. I also wish to take this opportunity to convey my highest appreciation to His Royal Highness Tuanku Sultan of Selangor, who graciously officiated the new Hospital Kajang and the renaming of Hospital Tengku Permaisuri Norasikin on 13 February last. This hospital is especially for women and children in the district of Hulu Langat. I wish to quote the royal address of His Royal Highness the Sultan of Selangor at that ceremony, in which His Majesty commanded the Ministry of Health and also the state government of

Selangor, to consider the construction of a new hospital and the improvement of existing facilities. His Majesty's address also emphasised the need to build more health institutions to ensure the well-being of the people of Selangor is assured.

Based on His Majesty's royal address, I wish to begin my debate by upholding the royal address of His Royal Highness the Sultan of Selangor, to request the upgrading of health clinics especially in the Dusun Tua State Constituency (DUN). Among them are Klinik Batu 14, Klinik Desa Dusun Tua, Klinik Desa Sungai Tekali and Klinik Desa Batu 18. The condition of these clinics is dilapidated and no longer suits current needs and requirements, and requires serious attention. Therefore, I hope that the state government can allocate resources and take prompt action to upgrade these clinics, to ensure residents of Dusun Tua can enjoy comfortable and efficient health services. I wish to bring to the attention of this august House another very important issue. Regarding educational facilities in my area, especially in the Cheras, Hulu Langat area, due to the lack of national secondary schools. This area has witnessed a very rapid increase in population, but existing development is not keeping pace with school needs. At present, residents in the areas of Batu 9, Taman Santek, Batu 9, and Cheras Awana rely only on several nearby secondary schools, namely SMK Dusun Nanding, SMK Perimbun and SMK Batu 10. Although these schools function well, their capacity has reached maximum levels and they are unable to accommodate the growing number of students. And some parents are forced to send their children to school in Cheras, Federal Territory.

I request the Selangor government, as well as the federal government, to find a suitable location to build a new secondary school in the area. With a new school, it can reduce congestion problems in existing schools and give more educational opportunities to the children in this area.

I wish to record my appreciation to the state government for approving the allocation for the flood mitigation plan, RTB, which was announced at the State Assembly sitting in December 2024 last. This allocation is an important step, very much needed in efforts to tackle the flood problem, which often hits several areas in Dusun Tua. Last night there was also flooding. Such as Kampung Sungai Serai, Batu 14, Kampung Dusun Tua, Batu 16, Kampung Sungai Lui and Kampung Sungai Tekali. With this allocation, I believe the state government can implement various effective initiatives and projects to reduce flood risk, as well as improve drainage systems and water management in the affected areas. I also hope that these flood mitigation plan projects can be

implemented promptly, efficiently and take into account the needs and welfare of local residents.

I wish to request the state government, especially regarding the opening and preparation of the EKVE expressway, East Klang Valley Expressway. This expressway is one of the important projects that is eagerly awaited by residents of Dusun Tua. Hulu Kelang also wants it. The construction of this expressway will have a very large impact in reducing traffic congestion and speeding up the movement of residents as well as tourists who visit Dusun Tua. Hopefully, with the opening of this expressway, it can provide greater comfort and convenience to road users and boost economic development in the Dusun Tua area. I wish to express my appreciation to the Honourable Menteri Besar and the Selangor state government, for announcing the additional allocation for the Jualan Ehsan Rahmah (JER) in Dusun Tua. This programme has been fully utilised, especially by residents in the village areas, most of whom are of moderate income and need assistance, to ease the cost of living.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

Dusun Tua, Seri Serdang.

Deputy SpeakerEN

Seri Serdang stands up.

Silakan.

Tuan Abbas Salimmi Bin Che Adzmi@AzmiAMANAH · PHSeri SerdangEN

When I heard that Dusun Tua said this JER has helped a lot, especially the communities in village areas. Earlier I heard the argument from the Leader of the Opposition, Hulu Kelang, who said we only get RM1.70, as if it's just a small amount. So, what is Dusun Tua's view on this JER programme? Does it really help the people, or is it as Hulu Kelang said earlier.

Datuk Wira Johan Bin Abd AzizUMNO · BNDusun TuaEN

For me, this JER programme is very beneficial. Twice a month, if possible, I want four times. Because its impact has a positive effect on society, especially those in need, B40 and below. Perhaps Hulu Kelang mentioned earlier the ratio, Selangor has 7 million people. That's right. Whoever wants to buy, buy, not everyone wants to buy. M40, would they go there? So, that's his interpretation, his interpretation. But my interpretation, if possible, I want four times. Good. For me, I believe this programme is a very good example of the Selangor state government being concerned about the welfare of the people. Especially those who are less well off. This effort also proves that the state government truly understands the difficulties faced by society and strives to provide practical and beneficial solutions.

The Ministry of Tourism, Arts and Culture (MOTAC) visited the recreational area in my place, Sungai Gabai, recently. Thank you for the efforts and attention of the state government in pushing the project to rehabilitate that area. I believe this project will have a very positive impact on the local community and will open more economic opportunities for local residents, through the tourism and related services sector.

In Dusun Tua, there are school students who rely on public bus services to go to school. However, due to the lack of existing bus routes, it makes it difficult for them to go and return at suitable times. One of the main problems faced by families in the Dusun Tua area is the increase in school bus fares, which has a big impact on their finances. Therefore, many students now choose to use public bus services as an alternative. However, the limited capacity of public buses and the lack of routes cause them to face difficulties and to find suitable transport, especially at peak times. Accordingly, I request that the Selangor state government consider introducing Smart Selangor Bus routes and adding Rapid Bus services on the Dusun Tua route. This measure will bring great benefit to the B40 group and school students who need comfortable, affordable and easily accessible transport services.

I wish to voice concern about the issue of rubbish dumping in village areas. I raised this even in the last State Assembly sitting. This situation not only pollutes the scenery and river areas, but also affects the health of local residents through odour and air pollution. An immediate solution to this issue must be taken together with the local authorities (PBT) to find methods, such as a proposal to impose appropriate charges on village areas and commercial areas. They are the major contributors to the amount of rubbish produced every day. Unfortunately, they are not charged appropriately, given the amount of rubbish they produce. This proposal to impose charges may be able to cover higher waste management costs and provide incentives for them to reduce waste and raise awareness of more responsible waste management. I have received complaints from many residents regarding delays in collection, which do not follow the existing rubbish collection schedule. Rubbish that is not collected causes environmental pollution. I have consulted with KDEB, and most of these rubbish lorries are badly damaged due to the problem of potholed and damaged roads at the Tanjung Dua Belas disposal site. Most

lorry damage involves serious damage. This causes the collection schedule to change. Dry Sharp, broken, the lorry detached, tyre problems, and repair time requires more than 14 days. This is the information I received. This is one of the causes of the delays in the rubbish collection schedule in Selangor. In particular, I request the government to review and promptly repair the road so that this issue can be resolved. What I understand from KDEB is that the Public Works Department (JKR) has held briefings and also made proposals to upgrade this road, which is indeed extremely bad. Next, Dusun Tua wishes once again to raise the issue of illegal rubbish dumping sites. In Dusun Tua there are still illegal rubbish dumping sites. I congratulate the District Office, YDP Majlis, for our joint operation, but I do not know how this operation can leak. When we arrive at the site, not a single machine is there, as if nothing has happened, but a day or two after we return, the rubbish dumping operation resumes. First, what I want to raise again is at Taman Pinggiran Delima on the Bukit Ampang route. Second, at Kampung Sungai Serai, it has already been seized, four trenches have been dug, and they have covered the trenches back up. I am not sure how powerful these operators are. And what is more frightening, another rubbish dumping site is less than one kilometre away, roughly at the Semenyih Dam, Kampung Sungai Tekali. This is the joint operation we carried out, but when we came, nothing happened. So the matter of illegal dumping is closely linked, perhaps because of the situation at Tanjung 12 where the road is so bad. I hope the EXCOs concerned can look at and inspect this rubbish disposal. I feel it is very serious in Selangor and drastic action must be taken. And finally, I thank Mr Speaker, the Honourable Menteri Besar, the EXCO line-up and the Honourable Members. I hope every proposal and debate raised will be given attention by the State Government to be implemented for the common good. With that, I close my debate by upholding the royal address of His Royal Highness the Sultan of Selangor, that the state remains on the right path towards a more brilliant progress. Thank you.

Deputy SpeakerEN

Thank you, the Honourable Member for Dusun Tua. Now it is the turn of the Honourable Member for Paya Jaras. We have 11 minutes, okay.

Dato' Dr. Ab. Halim Bin TamuriPAS · PNPaya JarasEN

Assalamualaikum W.B.T. Honourable Mr Speaker, Honourable Dato' Menteri Besar Selangor and all Honourable Members. Paya Jaras takes part in the debate on the motion of thanks to Tuanku on Tuesday, 18 February 2025. DYMM has touched on many matters in the Titah of His Majesty that Honourable Members should note. This Honourable Member's point is the attentiveness and loving care of Tuanku towards the people of the State of Selangor. There are 6 matters that I touched on in my speech, which place more emphasis on points I have raised in previous speeches. The first issue is quarry lorries and heavy vehicles.

At the EXCO during the last session, residents of Taman Indah, Taman Jaya, Kampung Matang Pagar, Taman Seri Putera and Saujana Angkasia, Kampung Melayu Sungai Buloh, live in anxiety because every day they have to face heavy vehicles passing through the area. The tunnel newly built and repaired by MPS at a cost of 400 thousand ringgit has begun to be damaged. These quarry lorries operate regardless of time, from early morning to the evening peak, and some operate at 2 or 3 am on Saturdays and Sundays. This greatly disrupts their lives. I request that the state government look at this matter seriously and expedite a special road or an alternative route for quarry lorries and heavy vehicles. I am very worried about the safety and lives of the local residents.

The second issue is one raised by other colleagues, Members of the Dewan Rakyat Negara, sorry, my State Assembly, namely the issue of flooding in Paya Jaras, which occurs repeatedly. This is not a matter that will stop being raised until it is resolved. Each time I raise this issue in a sitting, residents who live near Sungai Subang have recently voiced concern about the very slow progress of the project, and some have also stated that the project has problems. What is the current status of the Sungai Subang flood mitigation progress? I further stress that the phase 2 flood mitigation project must be expedited, in line with the advice in the Titah of Tuanku Sultan Selangor that flood mitigation projects must be expedited. I hope there will be no more cancellation of flood projects, because the impact of floods is very large on the economy and causes emotional distress to the people.

The third issue concerns strata titles in Bandar Sungai Baru, Sungai Buloh, at Desa Bukit Indah. Residents often come to meet us to complain about problems with titles they still have not received until now, and I am confident that this is not only an issue here, or in the Paya Jaras area; it happens everywhere. The issue of low-cost title in phase 1 and phase 4 of Bandar Sungai Buloh has dragged on for decades, compounded by the titles for phases 1 and 2 of Desa Indah. Issues like these occur everywhere, but the state government must find a decisive way to resolve the strata titles, the titles of houses by developers that have faced financial problems and have been wound up. Residents pay monthly to the bank or to the government, a government loan, but even when the house is fully paid, ownership remains uncertain and no longer belongs to them. This is a question that must be looked at decisively and raised: how will the state government resolve this problem, how will strata titles be resolved for residents? There are even buildings. I have just visited a block of flats called Flat Sri Sungai Buloh, which is 80 years old and is now in a very dilapidated condition, and management has stopped. The management of this housing issue is very critical, even though residents have paid in full. The question residents face is how to sustain or maintain this house, because it must be looked at and must be looked after. This has become a major question and a major housing issue in the State of Selangor.

The fourth matter is the water retention pond at Taman Seri Alam. On 29 December 2024, a tragic incident struck Seri Alam, where 199 houses were reportedly affected when the retention pond burst. This case is the second time in this park. It went viral on social media. When I arrived that afternoon, the rain in the area was very heavy, and it apparently caused the retention pond to burst. When I arrived, about an hour later, the highest part of the area was at waist level, and many houses were damaged, which made residents feel that something must be done in this area. I request that this retention pond be fully closed and replaced with a pond in another suitable location. MPKS and JPS should direct the developer, MK Berhad, to resolve this problem and to carry out a detailed study to overcome it. From now on, no local authority should allow any high pond near residential areas, such as a wall that could collapse and cause many houses to be affected. The developer has been informed and has only paid RM1,500 as an initial payment. I stress that the state government must ensure that the developer pays compensation commensurate with the damage that has occurred. Residents have also stated their intention: if they are dissatisfied with this, they will take the matter to court and obtain the appropriate compensation, because this is not the first time, but the second time it has happened.

I would like to touch on the development of traditional villages, especially in the areas of Paya Jaras, Kubu Gajah, Kampung Merbau Sempak and the Kampung Melayu Sungai Buloh area, which are disorderly. Based on information we have received, what has happened is that the planned development of traditional villages is not well managed: there are clogged drains, and roads are only done on a one-off basis, piecemeal and haphazard. I request that this issue be treated critically, because it will cause these villages to be neglected if it is not seriously monitored.

The seventh matter I wish to debate is local authority expenditure. I begin with the year 2023, based on an audit conducted, which found that local authorities are no longer permitted to spend their allocated funds to assist agencies other than the Public Works Department (JKR) and PLB in repairing infrastructure such as roads, drains and slopes. In my view, local authorities should be permitted to assist other agencies in their areas in helping them resolve problems related to public health. As long as the local authority spends allocations for the welfare and well-being of the people in its area, it should be granted permission, especially for public use, street lights, bus shelters, community halls and so on. There must be a clear policy to be referred to as a guide for implementing programmes such as these. Local authorities should also be assessed on performance based on the people, because their income is derived from revenue collected from the people. Therefore, the performance of local authorities must be assessed based on the quality of services provided, and not merely on the amount of collections achieved and their financial reserves.

Finally, I would like to touch on the issue of SSCC Mall and PKNS. I want the role of government-linked companies (GLCs) to be reviewed, because in my view, their current function, PKNS cannot be measured solely on the bottom line like other private companies. If this becomes the absolute measure, it is not surprising that PKNS has deviated from its original purpose when it was established in 1964. We need to go back to basics, with respect, where the main objective of PKNS, among others, is to develop Bumiputera interests in the business of developers of new towns and industry. However, the current trend, like other GLCs, is that they can only form joint ventures with partner companies such as LBS, Setia Eco World and so on. But we must remember that the purpose of PKNS in 1964 was specifically as a trust and responsibility to safeguard the fortunes of Bumiputera in the fields of business, trade and industry. This purpose must be engraved in the minds of every CEO who leads PKNS. This responsibility remains on the shoulders of the Most Honourable Menteri Besar, the board of directors and the CEO of PKNS. However, in my assessment, I do not see the sincerity to live up to the trust given at this time, because they are running away from the responsibility given.

Deputy SpeakerEN

Honourable Member, please wrap up. Is there still time? Just now I already gave you 12 minutes, actually.

Dato' Dr. Ab. Halim Bin TamuriPAS · PNPaya JarasEN

There is still a little more for the summing-up tomorrow, just a little more.

Deputy SpeakerEN

Okay, I will add 5 minutes tomorrow. Honourable Members, it is now 5 pm, so the House is adjourned until tomorrow, 20 February 2025, starting at 10.00 am. The House is adjourned.

(THE HOUSE ADJOURNED AT 5.00 PM)