Selangor · 24 November 2025

15th Assembly, 3rd session, 3rd meeting · 475 turns · 55,842 words · official PDF ↗ · Digital Hansard ↗

425 of 475 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.

(Opening)

Secretary of the HouseEN

Good afternoon and greetings of peace. The Order of Business for the Third Meeting of the Third Session of the Fifteenth Selangor State Legislative Assembly on 24 November 2025 begins with the recitation of the prayer.

Assistant Secretary of the HouseEN

Recitation of Prayer (Prayer recited).

Oral QuestionsQuestions

Secretary of the HouseEN

The next item on the Order of Business, Questions.

Deputy SpeakerEN

Bismillahirrahmanirrahim, Assalamualaikum Warahmatullahi Wabarakatuh. Greetings of peace, good morning to all Honourable Members. I would like to take the opportunity this morning to welcome all Honourable Members to the House for us to sit this morning. As we are aware, since last night the rain has not stopped in the state of Selangor up until this morning. Let us all ensure that the Service Centres of each of the State Assemblymen (ADUN) are on standby in case of any disaster, and we also ask government agencies to be on standby, Insyaa Allah.

To proceed with this morning's sitting, I will now proceed with the Oral Question of the Honourable Batu Tiga.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Mr Speaker, Standing Order 12, may a count be requested.

Deputy SpeakerEN

Is it not enough yet?

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

The attendance count for us this morning.

Deputy SpeakerEN

Honourable Members all, since the Honourable Sungai Ramal has raised a point of order just now, what is it? Standing Order 12 (1), therefore under Standing Order 12 (2) of this House I call on Honourable Members who are outside the House to enter the House immediately. I ask the Secretary of the House to have the bell rung, yes. Just a moment. Let us count first, is it correct or is it short? Short. How many are there?

Secretary of the HouseEN

Three more are needed.

Deputy SpeakerEN

Three more needed, yes. So we will ring the

bell to ensure that Members of the House who are outside are given time to reach the House. I understand. Wait a moment. I understand, yes, the situation outside is raining, perhaps some are stuck in traffic, stranded, so we give time and we ring the bell for, the Leader of the Opposition is not here? Not yet, perhaps he is on his way, so we ask the Bentara (Sergeant-at-Arms) to ring the bell for 2 minutes, yes. Please proceed.

(Bell rung) (House silent)

Deputy SpeakerEN

Honourable Members all, the count result is 19 persons, therefore the House will resume. I ask Batu Tiga to put the next question.

Assalamualaikum Warahmatullahi Wabarakatuh. Thank you, Mr Speaker, my question is number 59.

Oral Questions — 59. OKU Infrastructure DevelopmentQuestions

59. To ask YAB Dato' Menteri Besar:-

a)

Have all local authorities (PBT) already got an OKU access action plan? What references have the PBT used so far?

b)

How is compliance of existing buildings monitored?

c)

Are penalties or fines imposed on developers who fail to comply with the stipulated conditions?

Tuan Papparaidu A/L VeramanDAP · PHBantingEN

Deputy Speaker, I am answering on behalf of the Honourable Member, yes, he has left. Thank you to the Honourable Batu Tiga for asking about OKU infrastructure development, yes. There are 3 questions:

a)

Have all local authorities (PBT) already got an OKU action plan? What references have the PBT used so far? b) How is compliance of existing buildings monitored?

c)

Are penalties or fines imposed on developers who fail to comply with the stipulated conditions?

Thank you to the Honourable Batu Tiga who always champions the issue of OKU, thank you.

(a) Deputy Speaker, for the information of the Honourable Member, the provision of basic OKU facilities is an obligation of all local authorities (PBT) through the provisions or laws and guidelines provided as follows:

1. The amendment to the Undang-undang Kecil Bangunan Seragam (UKBS) 1984 through Section 34A has outlined that every new development must provide basic facilities for OKU to facilitate those groups in transacting in government buildings and commercial areas. In addition, UKBS 1984 also requires all public buildings to provide access to enable Orang Kurang Upaya (OKU) to enter, exit and be within the building.

2. The Universal Design Planning and Design Guidelines, with permission, developed by PLANMalaysia in 2011. These Guidelines emphasise the application of the universal design concept in planning facilities and urban environments that can be accessed by all groups of individuals.

3. In addition, the State Government through the Selangor OKU Action Council will launch the Selangor OKU Policy in the near future. This Policy will become the reference document for all OKU-related initiatives in the state of Selangor. This Policy will also apply to PBT under the Selangor State Government Administration.

There are PBT that have their own guidelines, among them the Petaling Jaya City Council and the Subang Jaya City Council have developed the Barrier-Free City Action Plan which covers aspects of providing physical infrastructure that is OKU-friendly and the implementation of programmes that support accessibility as well as OKU participation in the local community.

As for question (b), for new buildings, PBT use the Compliance Checklist for UKBS 34A 1984 which is prepared based on the MS1184:2014 standard which is mandatory under UUK 34A(2). For existing buildings, compliance is monitored through access audits, technical reviews during applications for plans to modify or upgrade buildings, as well as public complaints.

As for (c), developers who fail to comply with OKU access conditions may be subject to legal action as follows:

i. Breaches of the Akta Jalan, Parit dan Bangunan (Akta 133) and its by-laws may be subject to a fine of up to RM50,000.00 and or imprisonment of up to 3 years.

ii. In addition, under the Akta Kerajaan Tempatan (Akta 171), PBT may impose a fine or imprisonment or composition for offences under this Act and offences under the By-Laws enacted by PBT. That is all, thank you Mr Speaker.

Deputy SpeakerEN

Thank you, Honourable EXCO. Is there a supplementary question?

That's it, I would first like to seek guidance from Mr Speaker because the EXCO who is answering is not present. If I give a supplementary question, is it allowed or not?

Deputy SpeakerEN

A supplementary question may be asked, if necessary it may be answered in writing later.

Or perhaps I seek guidance from Mr Speaker that the question be answered by the EXCO for PBT. Is that allowed? Because..

Deputy SpeakerEN

Yes, it is up to the Honourable Pandan Indah, what is this, Sekinchan?

Thank you Mr Speaker for that guidance. I want to ask, since there are already guidelines, we already have the Universal Design guidelines by PLANMalaysia 2011, we also have Akta 171 and also several other UUK. But when we talk about developers' failure to comply with the aspects of this Universal Design, it actually gives rise to a sense of the Government's lack of seriousness in setting conditions, and when we adopt such an approach, I hope it does not become a situation where developers can take it lightly because the number of new compositions is RM50 thousand, so that amount is seen as rather small. My supplementary question is, to what extent can our PBT truly enforce, and it is not actually limited to the use by OKU only, we must also cater for senior citizens and so on, so to what extent can we truly enforce what we have today, and my next question is, in what people call, the guidelines we have, is there a need for what is it called, certificates, is there a need for officers in the PBT who have certificates that can entitle them to implement that? Is it necessary for that condition, or is the PBT merely following certain guidelines only. I seek views.

Dato' Ng Suee LimDAP · PHSekinchanEN

Thank you Deputy Speaker, thank you Batu Tiga. I take this supplementary question in relation to the Universal Design that the Honourable Member raised. We indeed want to ensure that all developers who implement projects wherever they may be comply with what is required so that facilities for OKU and senior citizens can be met. This is indeed the wish of the State Government, but sometimes there are oversights or developers who are cheeky and who do not comply fully with what is done, therefore a firm monitoring by PBT, by all PBT must be carried out, especially a specific committee to monitor issues related to such matters, and I will ensure that this matter will be discussed with PLANMalaysia, with PBT in upcoming meetings including in the STANDCO meeting so that this matter is taken seriously, yes, not merely a passing glance or just to fulfil requirements, but taken seriously so that this matter becomes one of the main agenda items in the approval by the KM, CCC and so on. This will be taken into consideration for the information of the Honourable Batu Tiga. Thank you.

Boleh?

Deputy Speaker

Soalan tambahan?

Hah.

Deputy SpeakerEN

Can the EXCO who is doing this not be here?

Dato' Dr Ahmad Yunus Bin HairiPAS · PNSijangkangEN

If possible I would like to obtain information from the EXCO for PBT.

Deputy SpeakerEN

EXCO for PBT? Okay, the last supplementary question.

Dato' Dr Ahmad Yunus Bin HairiPAS · PNSijangkangEN

Thank you Speaker. I only want to know whether in reality there are developers who do not comply with the conditions in this state of Selangor? If possible in writing, how many PBT in reality do not comply with these conditions and breach these conditions, and how many have been issued compositions that may be significant for us to review. Thank you.

Dato' Ng Suee LimDAP · PHSekinchanEN

Alright, thank you Honourable Sijangkang. Surely there are many developers who comply, but there are a handful who do not, so I will obtain these figures to convey to you in writing. How many, how many developers do not comply, that's it, thank you.

Deputy SpeakerEN

The next question, Jeram, is not present.

Tuan Mu'izzuddeen Bin MahyuddinPAS · PNHulu BernamEN

Honourable Mr Speaker, may I take Standing Order 24(2), yes, for the Jeram question.

Speaker

Okay, silakan.

Tuan Mu'izzuddeen Bin MahyuddinPAS · PNHulu BernamEN

Jeram question number 60.

Oral Questions — 60. Madani People's ParkQuestions

Dato' Harrison Bin HassanBERSATU · PNJeramEN

60. To ask YAB Dato' Menteri Besar:-

a)

What is the status of the upgrading project of Taman Awam Bandar Melawati into Taman Rakyat Madani, for which MPKS has been allocated RM1 million for infrastructure works?

Dato' Ng Suee LimDAP · PHSekinchanEN

Thank you Honourable Member from Hulu Bernam, who has taken the question from Jeram regarding the issue of the latest status upgrade of Taman Awam Bandar Melawati to Taman Rakyat Madani, the upgrading works of the Public Park of the local authorities (PBT), Taman Rakyat Madani, Taman Awam Bandar Melawati Kuala Selangor Darul Ehsan are in implementation by the successful contractor appointed starting from 11 August 2025 until 1 December 2025. This project is expected to be completed fully and can be used by the public starting January 2026. However, there is a slight extension of the completion period, namely (EOT) Extention Of Time, which we have given until 31 January 2026. Progress at the site is 80%, that is all, thank you.

Deputy SpeakerEN

Thank you Honourable EXCO. Meru is not here, Dusun Tua is not here, Morib also is not here, Morib is here, sorry I did not see, I apologise, the Honourable Morib I did not see.

Tuan Rosnizan Bin AhmadBERSATU · PNMoribEN

Thank you Mr Speaker, but my question has already been answered.

Deputy SpeakerEN

But the question of the Honourable Morib has been answered together with question number 13 earlier, so the Honourable EXCO has already answered, okay thank you, Hulu Kelang is also not present.

Tuan Rosnizan Bin AhmadBERSATU · PNMoribEN

I take Standing Order 24(2).

Deputy SpeakerEN

Because actually like the Ruling issued by the Speaker earlier, that absences must be notified to Mr Speaker, but I did not receive any notice stating whether Hulu Kelang is absent today. Paya Jaras, we received a notice from Paya Jaras, whose question is Paya Jaras, who is bringing it?

Tuan Mohd Shafie Bin NgahPAS · PNSungai Ramal

Saya bawa.

Deputy Speaker

Silakan.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

I request Standing Order 24(2), I take the Paya Jaras question, question number 65. Thank you.

Oral Questions — 65. Collapsed Bridge at Jalan Gajah 16, Kampung Kubu GajahQuestions

Dato' Dr. Halim Bin TamuriPAS · PNPaya JarasEN

65. To ask YAB Dato' Menteri Besar:-

a)

What is the State Government's plan to build the bridge that collapsed due to floods?

b)

How much is the construction cost of the bridge?

c) When will the project begin and when is it expected to be completed?

Thank you Honourable Paya Jaras and also Sungai Ramal who helped bring this question. Thank you Deputy Speaker, question 65 is related to the question concerning the bridge that collapsed at Jalan Gajah 16, Kampung Kubu Gajah, so the Honourable Paya Jaras wants to know the State Government's plan to build the bridge that collapsed due to floods and also the cost. And when will it begin, for the information of the Honourable Member, the bank upgrading works being carried out in a nearby location are part of the alignment of the Sungai Subang Flood Mooring Project, by the Selangor State Irrigation and Drainage Department. Referring to the decision of the 20th State Executive Council Meeting in 2022 on 7 September 2022, the Selangor State Public Works Department (JKR) was directed to upgrade 2 existing bridges in the alignment of this Flood Mooring Project at Sungai Subang, namely Kampung Kubu Gajah, that is the Kubu Gajah bridge and Jalan Gajah 16. However, on 8 August 2025 one of these bridges, the one at Jalan Gajah 16, collapsed, so before we could build a new one it collapsed first, due to the strong currents of the heavy rain and strong flow of Sungai Subang. So indeed there is a plan to upgrade this bridge, so we have taken the necessary steps, the first being that the State Government through the Selangor Public Works Department (JKR) has submitted the application for the construction of a new bridge at Jalan Gajah 16 and it will be implemented, construction in 2026. We know this bridge actually has an alternative route, which is why it is not so critical, but nevertheless this is part of what we plan, we will implement it next year, Insyaa Allah. The estimated construction cost of this new bridge is around RM20 million, covering the clearing works of the collapsed structure, construction of the old structure, drainage system and related works, which will be carried out by JKR, and the project will be implemented once the allocation for next year is approved in our Budget and will use the annual allocation, and the development will be completed within a period of two years. That is all.

Deputy SpeakerEN

Thank you Honourable EXCO, the next question is from the Honourable Selat Kelang.

Datuk Abdul Rashid Bin AsariBERSATU · PNSelat KlangEN

Thank you Mr Speaker, my question is number 66.

Oral Questions — 66. Selangor Digital Education Strategy in the AI EraQuestions

Datuk Abdul Rashid Bin AsariBERSATU · PNSelat KlangEN

66. To ask YAB Dato' Menteri Besar:-

a)

What is Selangor's strategy to strengthen secondary school digital education so that students are able to compete in the global economy based on artificial intelligence (AI) and automation?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Selat Kelang, for the question raised, which asks what strategies Selangor is taking to strengthen digital education in secondary schools so that they can compete in the global economy based on artificial intelligence (AI) and automation?

The State Government and the State Education Department (JPN) of Selangor are constantly and firmly working towards digital education in Secondary Schools so that students can compete in the global economy based on artificial intelligence (AI) and automation.

The strategy to strengthen digital education in Secondary Schools is not limited to a single plan. Rather, it is a multi-layered approach to create a comprehensive ecosystem and prepare students for the global economy driven by Artificial Intelligence (AI) and automation. Among the strategies implemented by JPNS are:

i. Implementation of the Core Policy of the Ministry of Education Malaysia (KPM) by translating and implementing the Digital Education Policy (DPD) in all Secondary Schools. Its main focus is as follows: Teacher Competency Development: JPN Selangor actively provides training and continuous professional development to teachers to ensure they are proficient in integrating digital technology and AI into Teaching and Learning (PDP), with more than 100 activities carried out by the Selangor State Education Department and 36 Teacher Activity Centres (PKG) throughout the state of Selangor, involving a total of 5,054 teachers.

ii. Student Digital Empowerment Programme: JPN Selangor exposes Secondary School students to various digital-related programmes and competitions, involving thousands of students each year, to hone their skills and innovation, with more than 21 competitions established under the Student Digital Empowerment Programme under the Resource and Technology Division, Ministry of Education Malaysia.

iii. STEM Centres: JPN Selangor is also involved in developing focus hubs, such as the first STEM HUB at the Teacher Activity Centre (PKG) Tanjong Karang, Sabak Bernam, to become a resource centre and hub for high-technology activities for the schools in the surrounding area.

iv. Use of the DELIMa Platform: The Selangor State Education Department seeks to drive the use of the Ministry's digital platform, DELIMa (Digital Educational Learning Initiative Malaysia). This platform is the main "gateway" to AI tools, as it has been equipped with more than 16 AI applications (such as Gemini, Chat GPT, and Microsoft Copilot) that can be accessed by all teachers and Secondary School students up to 6 November 2025. 100% of teachers actively use DELIMa, while 67% of students actively use the platform.

On behalf of the State Government, we also wish to open the next cohorts of the State Government's AI Travelliser programme to the education sector. As everyone is aware, in the State AI Travelliser we introduced it to departments so that they are able to resolve issues, problems or solutions at their departmental level. There is Media Selangor, there is the Land and Mines Office, there are local authorities (PBT) and so on that take part in the programme. They sit in one group, and that group offers solutions assisted by AI methods. Likewise for teachers, Honourable Member, next year we will introduce the AI Travelliser and open it to teachers so that some teachers are involved in the State AI Travelliser, and they will be exposed to AI applications, how Artificial Intelligence is used, and what those uses are for educational learning and school management in general. Others handled under STEM and so on have been operating for a long time under the State Education Department, particularly under the Ministry of Education Malaysia. Thank you.

Deputy SpeakerEN

Thank you, Honourable Sungai Tua. The Honourable Subang Jaya is absent; supplementary question.

Dato' Dr. Ahmad Yunus Bin HairiPAS · PNSijangkangEN

Thank you, Mr Speaker. Congratulations to YAB Dato' Menteri Besar on several State Government agendas that provide certain allocations for STEM to Primary Schools and Secondary Schools. Earlier it was mentioned that there are initiatives carried out at the Teacher Activity Centre Tanjung Karang, and I see that the readiness of these teachers is also very important so that they too are more exposed. I also see that these allocations need to be disseminated to other districts. I also see the involvement of the private sector: if in schools now there is involvement from parents, the parents' side, the private sector and the community. But the involvement of the private sector, especially companies involved in this sector, appears to have decreased somewhat, especially if I may mention my own area. In the past we had NEC, there was Toshiba; now there is AMROR, Renesas. Their involvement with the schools appears rather less, but the need for knowledge of STEM and also the development of AI is very high. I may perhaps have certain strategies on the part of the State Government involving allocations contributed to the Teacher Activity Centres to

enhance knowledge in STEM, and also involving private companies that can provide assistance and be implemented so that our children become more skilled and have higher knowledge. Thank you.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Sijangkang, for the question raised. The programme referred to at Tanjung Karang just now, which is a focal centre for STEM, Honourable Member, but for digitalisation, AI and so on it has been implemented in 36 Teacher Activity Centres throughout the State of Selangor, involving 5,054 teachers in total. I agree with the Honourable Member's view that there is a need for the involvement of the private sector or industry in ensuring that the shift in understanding of science, technology, automation and also digitalisation can be driven more quickly. Moreover, these institutions have the capacity to prepare a clearer path or laluan for these children to choose the fields of science, technology, and also technical and vocational, involving engineering and mathematics. That is why next year STDC will become the catalyst for this struggle or effort, and our efforts to empower STEM will begin to involve Secondary Schools, or secondary schools, with permission, because previously STEM was only opened after they took SPM, exposure to STEM was only at SPM, and we left it entirely to the Ministry of Education to manage these students. With the support we will offer later, or with the support of STDC which has links with industry, I believe it will accelerate and strengthen this effort. Recently I officiated a programme managed by Universiti Teknologi Hussien Onn, held at Kwasa Land, because it drew a huge attendance of Secondary School students, to introduce them to train and rail management technology and railways in Malaysia. We welcome such proposals and programmes, but most of those programmes are extracurricular programmes or programmes not in a formal approach; they are organised as side programmes on weekend afternoons and so on. So I am confident that with the involvement of industry, this will indeed accelerate the process and our efforts to strengthen the technical and vocational or STEM presentation among our school children, or among our students or pupils, and subsequently provide a sufficient talent pool to fill the shortages needed in those fields. The State Government will strive, and next year we have indeed asked STDC to drive efforts into Secondary Schools. Previously we only waited for them after SPM; now we want to enter Secondary Schools at Upper Secondary (Tingkatan Menengah Tinggi) or Senior Secondary, and perhaps if there is space we can enter Lower Secondary, and there we prepare the path or laluan I mentioned earlier so these children are ready, interested, and engage and explore the fields of science and technology, or what we call high-performance technical and vocational education. Thank you.

Deputy SpeakerEN

Honourable Seri Serdang.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Thank you, Mr Speaker. The Leader of the Opposition is skipping the House. My question is number 68.

Oral Questions — 68. Unresolved Issue of Transfer of House Titles in Lestari Putra and Saujana PuchongQuestions

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

68. To ask YAB Dato' Menteri Besar:-

a)

The issue involving the liquidator after the developer went bankrupt and the liquidator has not been performing its role. What is the latest status of this problem?

Datuk Borhan Bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Mr Speaker. Thank you, Honourable Seri Serdang. The issue raised, involving the liquidator after the developer went bankrupt and the liquidator not performing its role, what is the latest status? For the information of the Honourable Member, the issue of transfer of ownership for Lestari Putera and Saujana Puchong arose as a result of the original developer, Lestari Puchong Sdn Bhd, which was declared bankrupt earlier, failing to transfer ownership to the buyers, to be resolved. Accordingly, the State Government, through the Petaling District and Land Office (PDT), is negotiating with the liquidator appointed by the High Court, Ler Lum Advisory Services Sdn. Bhd., to find a fair and comprehensive solution, given that there are lots that still have outstanding land assessment and other technical issues that hinder the transfer of ownership. Honourable Member, the essence is that we are at the 13th process for ownership, but the final process cannot be completed because the rescuing party cannot pay and settle the land assessment or premium, and indeed this scheme, through another one, Apartment Seri Indah, has already been assisted by the Land and Mines Office for the purpose of applying for Strata Title. However, the transfer of Strata Title still cannot be completed by the developer. As I mentioned earlier, and also the original owners or holders of the Power of Attorney (PA), so the State Government is very concerned about the fate of the buyers who have long been waiting for the completion of this ownership. Therefore, an approach is being implemented through a formal administrative negotiation with the liquidator, with the aim of ensuring the buyers obtain their rights without additional financial burden. So, we will call a discussion with PTGS and also the rescuing developer to find the method, but we cannot introduce an element or involve a bail out. We do not want to become a precedent case that exempts them from paying premiums and so on. That would become a burden on the Government. So the method is that we have already made efforts to ensure the rescuing party bears whatever has been determined by the court. Thank you.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Supplementary question. Thank you, Honourable EXCO. For the Honourable EXCO's knowledge, I and the District Office have indeed held negotiations with the liquidator, but unfortunately the conditions imposed are rather strict. I give an example: the liquidator's closing fees dropped from 5% to 1.5%, okay. But they gave only a period of 6 months. The total that owners have to pay is nearly reaching RM20,000, including lawyer fees, MOT fees and so on. Another issue concerns land premiums. The unpaid land premiums, the liquidator does not have money to pay. So I think there needs to be intervention from the State Government to resolve this issue. But I am confident that in that area there are still assets that have not been developed, undeveloped land that has been handed over to the liquidator, where that land could be utilised. However, due to the stubbornness of this liquidator, I think the problem cannot be resolved today. So I ask the Honourable EXCO for their view on what other methods are available so that we can solve this problem, because this problem has not been resolved for nearly 25 years. We need attention from the State Government. If we only rely on the liquidator, I do not see this matter being resolved. In fact I have gone to his office three times without an appointment, and only then could I meet an officer. Going myself, I could only meet a clerk. When the District Office called the liquidator, he sent only a clerk who could not make any decisions. So I think here, I ask the State Government to take serious note and intervene in resolving the issue at both places, Lestari Putera LEP and the Saujana Puchong area. 25 years already, Honourable Member.

Datuk Borhan Bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Honourable Member. As for the solution regarding premiums, this is beyond the jurisdiction of LPHS, which can be negotiated together with PTGS. But from the cost of the solutions, among them those borne by the strata fund that the Most Honourable declared, we will cover roughly per lot, which will cost RM1,800 that we can bear. That is LPHS under the strata fund, where the surveyor's fee is RM1,500 per lot, preparation for different plans according to case by case, and the initial certificate application fee for the unit or share is RM200, and the subdivision application fee for buildings or PBB is RM50, JUPEM RM10, and printing cost RM50. A total of RM1,800 can be used from this special strata fund for us to assist. Only in terms of premiums, we may have to discuss with PTGS because that is under the jurisdiction of PTGS. Thank you.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Mr Speaker, one more supplementary question. Regarding the strata matter just now, I thank the Honourable EXCO of the State Government. I think this matter needs to be publicised to those who are in the strata, and that is an advantage for them and will to some extent help them in resolving ownership problems. However, regarding landed housing just now, concerning the premiums mentioned earlier, I think there needs to be a rather drastic action from the State Government to resolve this problem, because there are also many landed houses that have not resolved their ownership problems. Saujana Puchong and also the Lestari Putera area. They still pay land assessment, but some have begun not paying land assessment because they feel that we cannot resolve that problem. And we lose revenue from land assessment payments if they withdraw from paying any further.

Datuk Borhan Bin Aman ShahPKR · PHTanjong SepatEN

We understand, Honourable Member, but sometimes the cooperation of the developers, especially the liquidator, is such that when we call their meetings they cannot attend. So we cannot get any decisions. But nevertheless, PTGS and also LPHS, we will try, and we will invite the Honourable Member as well to sit around the table together to ensure what the solution path is, to ensure the minimum that we can help with. Thank you.

Deputy SpeakerEN

Thank you, Honourable EXCO for Housing. The Selangor State Legislative Assembly wishes to welcome the following visitors to the Selangor State Legislative Assembly sitting, from St. John Ambulans Malaysia Selangor Darul Ehsan, West Selangor area, numbering 15 persons led by Mr Ng Been Chong as area cartographer and also Mr Lim Sek Khin, Secretary. Welcome to the Selangor State Legislative Assembly. Next question. Gombak is not here. I ask Sijangkang.

Dato' Dr. Ahmad Yunus Bin HairiPAS · PNSijangkangEN

Thank you, Mr Speaker. Monday Blues, the quorum is nearly insufficient, the State Government and the Speaker are nearly sweating. My question is number 70.

Oral Questions — 70. Status of old housing estates developed by subsidiaries of the Selangor state government-linked company (GLC)Questions

Dato' Dr Ahmad Yunus Bin HairiPAS · PNSijangkangEN

70. To ask YAB Dato' Menteri Besar:-

a)

What are the State Government's plans for redeveloping housing estates that are more than 30 years old, have become dilapidated, and were developed by the State Government's subsidiary company (GLC) Selangor?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

First time hearing a 3-kerat pantun. Thank you, Sijangkang, for the question that refers to housing estates or apartments, with permission, which I refer to in this answer: apartments over 30 years old that are dilapidated and were developed by a subsidiary of the State Government. The initiative to redevelop old housing built by PKNS more than 30 years ago has always been one of the development strategies given priority. Since 2015, PKNS has identified and secured potential joint-venture partners for three (3) housing areas as follows. The first is the PKNS flats at AU3, which people there call Aau, aau AU3 Columbia. The second is the PKNS flats at Seksyen 17, Petaling Jaya. The third is the PKNS flats at Seksyen 16 Shah Alam, in front of the mosque. However, the proposals could not be continued because of failure to obtain the consent of more than 80% of residents. Second, high and unreasonable compensation claims from participants or residents, and difficulty in obtaining a suitable temporary relocation site that meets the needs and requests of residents. These are among the three matters I have always mentioned; we need to study them carefully, which is why the State Government is studying the URA efforts, Honourable Member, because without URA we cannot redevelop, and the condition of these houses and the residents here will continue to run down and will continue to be abandoned in this manner. These are among the major challenges for us, because it is subject to the KPKT Act, which requires at least 80% consent from residents, and it is followed by the area and so on, and the cost. Any developer we require to rebuild these housing areas must first develop housing to relocate these residents. We cannot let these residents move out, have the buildings demolished, and only start to build again after two or three years. Our challenge is the land: as in Columbia Flats and AU3 Flats mentioned earlier, we have already seen the site. But the density will soar high because we want to place several blocks. For Seksyen 16 Shah Alam, I think the number of blocks is very large. Too many blocks. If we want to do it, we must first find another site, perhaps in Seksyen 2, if such a site is available, so that residents there can be relocated and then we can move them to another place. That is the second very big issue, which makes it very difficult for developers to proceed unless they have very strong financial standing, ready to spend between RM100 million and RM150 million to build new blocks for the residents we need to relocate. Thank you.

Dato' Dr. Ahmad Yunus Bin HairiPAS · PNSijangkangEN

Supplementary question. Thank you, Speaker. Thank you, the Most Honourable Dato' Menteri Besar. Actually, I am more focused on housing developed by GLCs or the Perbadanan PKNS in these rural areas. Because of the nature of low-cost housing, I think its quality is not as good when compared with other housing. Although I understand that when we want to develop the housing, we must develop a new settlement for them to relocate to and so on. However, I see that today the challenge is already big. In rural areas, I think there is still government land that can be developed for this purpose alongside re-siting. And this, of course, requires study, feasibility, and also the readiness of these house owners. However, when the condition of the houses in these housing areas includes dilapidated houses left abandoned, and children no longer want to live there, perhaps they can be developed vertically, meaning no longer terrace houses but multi-storey houses, because I think this was once discussed in the state of Selangor, how mixed development, vertical schools and so on, can be developed. Perhaps in rural areas there is no need for houses that are too high, perhaps five storeys and so on. But these housing areas or dilapidated houses should be given the opportunity to be redeveloped, and there is also an opportunity for the generations after the buyers, namely children or grandchildren, to also have the chance to buy new houses with vertical development improvements, or flats themselves. Perhaps there will be comments from the State Government. Thank you.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Sijangkang, for the proposal and views on terrace housing, especially link houses that are dilapidated. However, we are ready to re-evaluate, to look at several localities and areas, and I myself have seen certain localities, for example if we go to the area facing flooding at Seri Nanding. That area was developed more than 30 years ago. That is in the Hulu Langat district. And in other districts too, I believe there are such areas. Nevertheless, our focus is given to low-cost apartment areas because some of their quality is too dilapidated and needs to be redeveloped by us. And I consider that the most important issue there is how the relocation process is carried out at the early stage. That is our greatest challenge, because usually out of 100 there will be at least one who objects. If we expect 100%, that means it is almost impossible for us to implement or offer something to them, and this involves assets or rights they already have, such as those with title deeds. Those with strata titles and so on. I believe it requires a study, because among the responses received, some are that if we relocate them to a place too far from their current residence, some will be uncomfortable, because some have built families there, their children have gone to school, have careers, and so on in the surrounding area. These are among the responses and feedback that often come to us. We have a more critical issue at Flat Berembang in Pelabuhan Klang.

That is not without reason, because the locality is no longer safe. We are focusing on that first, Honourable Member, because if the building is demolished and collapses, even though they have a settlement and also have homes, have their rights, the value will become nil. That is why we want to offer compensation or assistance of RM42,000 or we give them houses. This is still being discussed. I think if the KPKT is ready to bear part of the cost, we will be able to resolve a more real issue, Honourable Member, because the building has been declared unsafe. If it is unsafe, then how can we protect them, unless we ask them to move. But they have no option, and when we go there, the EXCO who came there earlier became a problem, being perceived as if we wanted to eliminate and demolish their homes. Whereas the reality is that the area is no longer safe. So indeed, Honourable Member, you mentioned things on landed land, terraces and so on. But in these apartment houses, they actually need more attention and more study. Because there are cases already declared unsafe, at Flat Berembang, in Pelabuhan Klang, which we need to address urgently. Thank you.

Soalan tambahan.

Deputy SpeakerEN

Supplementary question to the next question?

Supplementary question first, because it is related to the area. Honourable Member. Honourable Member touched on Seksyen 16. I understand that the situation there indeed requires new land, to relocate the existing residents first, before we can carry out development. But I want to give another scenario. In my meeting with the Ministry of Housing and Local Government (KPKT) and also PlanMalaysia, in Seksyen 18 or Seksyen 24 for example, I think there is no need to remove the original owners from the housing land first while waiting for development. Because the reserve in Seksyen 18 and 24 mainly has open areas that we can develop first. So can we consider areas like these, implement the Urban Renewal Act (URA) but not demolish first. We build on one side, relocate, then we demolish this part. What is your view?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Okay. We are ready to look at that area. Actually, the State Government also has another piece of land. But that land is actually a football field. Some 3 or 2 football fields in Seksyen 2 Shah Alam, not far from Seksyen 16. And the site is suitable, but the site is rather low. So if we are worried it will disturb the school needs and other needs there. And that is entirely State Government land. That may be usable. But I agree that the housing land in Seksyen 16 is indeed no longer suitable. It has one room, if I am not mistaken, or one room, yes, just one room. And I think we need to move them. But the blocks are too many there. And the State Government feels, I think, we need to do this. For 2 years, I have actually asked PKNS to immediately implement rejuvenation projects or redevelopment of old apartments. If we do not develop them, we will be leaving this time bomb, until it reaches a situation like Berembang, where the area is no longer safe. Because of lifespan, this is a study that was written by a media outlet. The lifespan of such an apartment house, Honourable Member, is actually a maximum of only 100 years. But if it was not built using the correct specifications, the cement is not sufficient, the sand is not sufficient or other requirements are not sufficient, the total life span will be reduced. Perhaps it becomes 40 years, perhaps 50 years. This is what we are worried about, because it may have been built earlier when we are not sure of its specifications and inspection. And the State Government must look into it. That is why we really want, if possible, to redevelop including the old terrace housing areas. But apartment areas are an urgent challenge that must be addressed by the Housing EXCO, especially by the State Government. Because this is a reality that we must address quickly and urgently. Thank you.

Soalan tambahan.

Deputy SpeakerEN

Okay. The last supplementary question.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Thank you, Mr Speaker, the Most Honourable. Once URA has been approved, the readiness of the State Government, especially the Selangor State Development Corporation (PKNS), to look at these housing areas so that we can redevelop them immediately. Because for me, Honourable Member, as the Most Honourable said earlier, it is a time bomb. It could explode at any time. So I think whether PKNS is ready, especially in taking over, and also after this URA has been approved. We do not want PKNS to keep playing with this issue, Honourable Member. Even building a golf course becomes a problem.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. I mentioned three main challenges earlier. First, consent from residents. If there is URA or Urban Renewal Act, it means the number needed may be reduced, a lighter burden compared with previous methods. The second burden is finding a qualified developer. Because the cost is large, as it involves the initial cost. Perhaps the Selangor Housing and Property Board (LPHS) can help here later. We have to think about how the savings fund we have can be used to develop first in any houses. So with that fund, we do not need to wait for the developer to put in the money, but the State puts in the money. We relocate them first, and it becomes the State Government's own before we implement the third process of change and transition. The third is when there is interference and disruption. By interference I mean when people who are overly clever come along. Those who do not know where they came from suddenly become heroes.

When they become heroes, they are the cleverest lawyers, the cleverest defenders. And in the end, they will not move anything at all. This happens a lot, including in several of our localities where we have relocated villages and so on. Because some overly heroic people suddenly come along, thinking they are the greatest defenders of these housing areas, whereas the reality is that they face dilapidated housing, and the quality of the asset is increasingly depreciating (with permission) and declining. And finally, the third issue is safety and life. So this is a reality that we must face properly. That is why URA alone is not the final answer, but we still have two challenges after URA, namely finding a qualified developer and handling the noise or disturbances that arise from the process of change or transition that we want to carry out for the welfare of the people. But the State Government must be realistic, and we must be objective, we must find answers, and often must provide continuous explanations so that those outside are not easily swayed or do not choose the opposite path, instead demanding unreasonable things, and in the end for years that housing cannot be developed or rejuvenated, and ultimately their lives will also be disrupted. Thank you.

Deputy SpeakerEN

Thank you, the Most Honourable Dato' Menteri Besar. The next question is from Batu Tiga.

Thank you, Mr Speaker. Question 71.

Oral Questions — 71. Domestic InvestmentQuestions

71. Asked to the Most Honourable Dato' Menteri Besar:-a)

What is the most active sector in investment received in 2025 and the projection for 2026? b)

What form of incentives are offered by Invest Selangor, MIDA and other agencies if investment comes into Selangor? c) What is the RS-2 plan in terms of attracting investment?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I request that questions 71 and 146 from Pandamaran be answered together. The State of Selangor continues to strengthen its position as a main investment destination in Malaysia, driven by a promising investment performance, a mature industrial ecosystem, and the proactive initiatives of the State Government. In terms of performance, for the period January to June 2025, Selangor approved a total of 948 investment projects in the manufacturing and services sectors with an investment value totalling RM 34.65 billion. Of this total, local investment contributed RM 18.91 billion, while foreign investment recorded a value of RM15.74 billion, showing a balanced confidence from domestic and international investors. The breakdown of this investment shows that the services sector is the main driver, with total investment approved amounting to RM 26.3 billion up to the second quarter of 2025, and RM 8.3 billion from the manufacturing sector. In the services sector, the Information and Communication (ICT) sub-sector dominates with investment of RM 11.4 billion, followed by the property development (Real Estate) industry with RM 9.3 billion. For the manufacturing sector, the transport equipment sub-sector recorded the highest total of RM 2.25 billion, followed closely by Electrical & Electronics with RM 2 billion. This trend is expected to continue, with the expectation that the E&E (manufacturing) and ICT (services) sectors will remain the most active sectors in 2026. To support the momentum of this investment inflow, the State Government has implemented various facilitation measures, especially in accelerating the development approval process. Two main initiatives in this regard are the Project Coordination Meeting held every month to discuss emerging investment issues, and the introduction of a new initiative, Speed Selangor. The main objective of Speed Selangor is to standardise, expedite, and facilitate the development approval process as well as business licensing at every Local Authority. This initiative is in line with the principles of Ease of Doing Business, which emphasise efficiency, transparency, and investor-friendly practices. Apart from procedural facilitation, various incentives are also offered to attract investors. Through the Federal Government and the Malaysian Investment Development Authority (MIDA), the main tax and financial incentives such as Pioneer Status (PS), Investment Tax Allowance (ITA), and Accelerated Capital Allowance (ACA) are provided. The State Government adds value through labour and training incentives such as the Program IKTISASS Selangor, namely TVET training and financial assistance through SIDEC for talent development, especially in the semiconductor industry. In addition, Invest Selangor offers comprehensive investment facilitation, covering site selection assistance, support in the Managed Industrial Park (MIP), the Selangor's Investors Soft Landing Incentive Program, and the Selangor Lab Partnership to encourage R&D collaboration between industry and institutions of higher learning. Looking ahead, the Second Selangor Plan (RS-2) outlines clear strategic planning to continue attracting investment. The main aspects include prioritising development in high-value industries such as aerospace, E&E, and automotive. This is supported by the development of catalytic infrastructure such as Selangor Aero Park (SAP) and Automotive Valley Serendah-Beringin. RS-2 will also continue the strategic planning from RS-1, such as the development of the IDRISS and SABDA regions to boost investment in less developed areas. Finally, the realisation of the Selangor Greater Klang Valley (SGKV) initiative, which coordinates four main cities (Shah Alam, Petaling Jaya, Subang Jaya,

and Klang), is expected to become a new catalyst for attracting more quality investment to Selangor. Thank you.

Soalan tambahan.

Deputy SpeakerEN

Please, Honourable Member.

The Honourable Member earlier mentioned 30% local participation. I would like some clarification from the Honourable Member on whether it means local SME suppliers can also be involved in the new investments, and how that would work. Would they have to apply, or would Invest list all local companies for the new investors?

Tuan Ng Sze HanDAP · PHKinraraEN

The new policy, the Local Economy Development (LED), is a 30% local content policy for Data Centers at this time, not for other industries. So for Data Centers that will enter the State of Selangor, a compulsory requirement is that they must comply with at least 30% local content, meaning that the components or equipment are produced in Malaysia, so they must use some of these components made in Malaysia to meet the requirements set under this LED policy. With this 30% policy, the Selangor State Government is confident that we can help SMEs, especially SMEs in the E&E sector, to get a new market so that they can expand their businesses into a very important and highly impactful sector, namely the Data Center Sector. Thank you.

Deputy SpeakerEN

The Honourable Member for Kota Damansara.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Thank you, Deputy Speaker. Kota Damansara's question is question number 72.

Oral Questions — 72. Allocation of 1 million for the free provision of vaccinesQuestions

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

72. To ask YAB Dato' Menteri Besar:-

a)

How will the students who will receive this influenza vaccine be selected?

b)

Does the government have plans to expand this vaccine programme to other districts?

c)

Does the government plan to further expand this programme in 2026 to cover all districts?

Puan Jamaliah Binti JamaluddinDAP · PHBandar UtamaEN

Thank you for the question from the Honourable Member for Kota Damansara regarding the allocation of RM1 million for the free provision of vaccines. Mr Speaker and Honourable Members, for your information, part (a) of the question has been answered together with question 13(b) from the Honourable Member for Rawang, question 63 from the Honourable Member for Morib, and questions 97(a) and (b) from the Honourable Member for Sijangkang earlier. Accordingly, I will give a response to parts (b) and (c), which will be answered together, regarding plans to expand this programme to other districts and what the plans are for 2026. Mr Speaker and Honourable Members, as the Honourable Member is aware, the Selangor State Government, through the Standing Committee on Public Health, has begun implementing an influenza vaccine immunisation programme for primary school pupils aged 8 and below starting from mid-November in four districts that recorded the highest influenza infections, namely Petaling, Klang, Gombak and Hulu Langat. After this, the State Government will carry out an assessment based on the programmes that have been conducted, and whether there is a need to expand them in 2026. The State Government will focus on selected primary schools in districts not covered this year, with priority given to districts that have certain factors as mentioned, a high incidence of influenza infection and so on. We will also look further at whether the low-immunity and high-risk groups, including the elderly as well as individuals with chronic diseases, and ultimately the need for strategic cooperation with the District Health Office and District Office, the Selangor State Education Department, and the Selcare panel clinics, to strengthen the implementation network.

Deputy SpeakerEN

Supplementary question, please.

Dato' Dr. Ahmad Yunus Bin HairiPAS · PNSijangkangEN

Thank you, Deputy Speaker, and thank you to the EXCO. It is a good programme, but I note that influenza has different strains every year. The vaccine will also differ every year, which is why it is given annually. Does the State Government plan to provide this vaccine every year, especially to the 4 targeted schools that have a high incidence, or to other schools that may also have a high incidence, or is the Federal Government also not planning for this, due to the annual provision of different strains? Perhaps we can get a response from the EXCO, thank you.

Puan Jamaliah Binti JamaluddinDAP · PHBandar UtamaEN

As I have answered before, this programme is actually more of a one-off programme, and we will monitor and see whether there is an additional need in 2026 or not. This year, the reason the State Government made this decision is that we were informed by JKNS and the Ministry of Health (KKM) that influenza cases were rising very high, especially among educational institutions. As for the elderly, responsibility was taken up by the Ministry of Health, where vaccine injections were given to the elderly aged 60 and above. So at that time, there was genuine concern, especially among parents and young people, about their children. Therefore, the State Government, out of concern for the people of Selangor, decided to implement this programme this year. For next year, we will discuss again with JKNS after receiving the report and so on, and all decisions will be made based on enforcement statistics and also perhaps the advice and feedback from the relevant agencies.

Soalan tambahan.

Deputy Speaker

Silakan.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Alright, since the Government looks at reports from the relevant agencies, I would like to ask the Government for some clarification. Given that this year our target is students, will the Government propose a slightly different strategy next year, since the main focus is on students who will be facing major exams, for example the SPM. This is because these are the groups that will be exposed to influenza, and if they get infected, all their efforts will be affected, which will also affect their future. Does the Government propose changing the strategy to focus only next year on students facing major exams, rather than today's approach based on areas with outbreaks, which may indirectly do so? That is why I ask for clarification from the Government, thank you.

Puan Jamaliah Binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Honourable Member for Kota Damansara. As you said, we will focus more on factors such as which groups currently have low immunisation. This is because what we are worried about is that if there are deaths, they are related to issues like influenza. So we will examine this, and if there are additional proposals like that, we will discuss them with the relevant agencies. And the most important agency is the Selangor State Health Department, because they have broader experience and knowledge on this matter.

Deputy SpeakerEN

The next question is from the Honourable Member for Jeram. The Honourable Member for Jeram is not here, nobody has brought him, okay. The Honourable Member for Sungai Ramal.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Deputy Speaker, question number 74.

Oral Questions — 74. Achievements of the ‘First Mile’ and ‘Last Mile’ Connectivity System in SelangorQuestions

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

74. To ask YAB Dato' Menteri Besar:-

a)

Which area is the most successful, and what is the reason?

b)

Which area is the least successful, and what is the reason?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, the Honourable Member for Sungai Ramal asked about the most and least successful first mile and last mile connectivity achievements in Selangor, and the reasons. Mr Speaker, the first mile last mile ecosystem for the state's public transport must take into account various aspects and modes of public transport provided, by integrating state public transport, for example the Bas Smart Selangor, walkways and micromobility, as well as public transport services provided by the Federal Government such as LRT, MRT and RapidKL buses. Among the areas most successful in implementing first mile last mile are urban areas such as Shah Alam, Petaling Jaya and Subang Jaya. This is due to several factors, including high population density, land use and mixed development, namely mixed development, a complete rail connection, the provision of specific infrastructure such as BRT, DRT, feeder buses, walkway connectivity, and focal destinations such as higher learning institution locations, shopping centres and offices. Good quality public transport services and the active participation of the private sector in providing transport infrastructure. The combination of physical infrastructure in terms of transport modes and dense development contributes to achieving that first mile last mile. Among the areas that have received less response in the State Government's efforts towards full first mile last mile coverage are low-population or rural areas in Selangor. This is due to several factors, including low density which contributes to long distances to rail or bus stations, non-dense demand for regular transit, a lack of walkways or footbridges, and feeder services that are not economically sustainable, thank you.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Supplementary question, Deputy Speaker. There is one matter that was deferred by the Federal Government, namely highways. Is the Honourable Member also aware of the Lebuh Raya Bangi, Putrajaya? Because it aims to ease congestion around Bangi and also Kajang. Does the Honourable Member have any information on the cancellation of that highway, and will it be done again?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I think this supplementary question is beyond the main question. The main question concerns first mile and last mile connectivity in Selangor, so that is more related to public transport, but the supplementary question is about highway development. So I do not have an answer for now regarding the development of the Bangi to Putrajaya highway, thank you.

Deputy SpeakerEN

The Honourable Member for Kajang.

Tuan Cheong Kian YoungPKR · PHKajangEN

Mr Speaker, the drizzle does not stop, water overflows and covers the earth, floods strike here and there, the Leader of the Opposition is playing truant, busy going who knows where, Kajang question 75.

Oral Questions — 75. Senior Citizens WelfareQuestions

Tuan Cheong Kian YoungPKR · PHKajangEN

75. To ask YAB Dato' Menteri Besar:-

a)

What assistance has been provided by the State Government to Older Persons' Care Centres?

b)

Please list the land reserved for building welfare homes by District.

Puan Anfaal Binti SaariAMANAH · PHTaman TemplerEN

Thank you, Honourable Member for Kajang. It is not drizzle but heavy rain. Okay, the question is on elderly welfare. For the Honourable Member's information, the Federal Government has channelled annual operating assistance for Older Persons' Care Centres, or PAWE, amounting to RM50,000. This assistance covers funding such as manpower, management and operation of PAWE programmes and activities and services provided, as well as premise rental. At the State Government level, the assistance given to care centres is firstly the Sinergi Prihatin Programme, namely the Joint Venture Incentive with Welfare Centres of Associations and Organisations that wish to implement collaborative welfare activities that benefit vulnerable groups such as the elderly. Secondly, the Care Centre Grant programme, an incentive in the form of financial assistance of up to RM5,000 to care centres to encourage more care centres to register with the relevant authorities while increasing their commitment to providing quality and safe care services.

For part (b), regarding land reserved for building welfare homes by district. Overall, there are 5 pieces of land reserved for building welfare homes in 4 districts, namely in Petaling, Gombak, Hulu Selangor and Sabak Bernam. Meanwhile, there is no reserved land in the districts of Klang, Hulu Langat, Kuala Selangor, Sepang and Kuala Langat. The detailed list of reserved land by district is as follows. In Petaling, the reserved land for welfare home use is the Single Mothers' Complex, gazetted by the Selangor State Government, and the Older Persons' Complex, gazetted by the Selangor State Government. In the district of Gombak, it is public infrastructure, namely the elderly site of the Selayang Municipal Council. In the district of Hulu Selangor, one reserve for an older persons' activity centre located in Mukim Serendah was declared through a State Government gazette dated 5 September 2024.

Meanwhile, in the district of Sabak Bernam, the gazetted land is the Sabak Bernam District Older Persons' Activity Centre in Mukim Pancang Bandana. In the district of Kuala Langat, no welfare home has been gazetted within the district of Kuala Langat. There are only 2 welfare activity centres in Kuala Langat, namely an Older Persons' Activity Centre operating on privately owned land, and a Children's Activity Centre operating on Government land with the permission of the State Government, that is all for information.

Soalan tambahan.

Deputy Speaker

Silakan Sabak.

Tuan Sallehen Bin MukhyiPAS · PNSabakEN

Thank you, Deputy Speaker, and thank you to the Honourable EXCO. Apart from PAWE and these older persons' care centres, there are centres that accommodate older persons, which are occupied by older persons, but they are not focused purely on care, rather on religious study programmes. For example, I myself have set up one for a long time, where there are about 22 older persons we look after, but it is not just about caring; their condition is that they must stay there and study the Quran at this religious centre. So what form of assistance can be obtained, apart from, if it is not a religious study centre, I mean, if it is not a care centre but a place that accommodates older persons who also do not have, some who are unable to work but can still manage themselves because their condition is that they must stay there and learn and recite the Quran there, thank you.

Puan Anfaal Binti SaariAMANAH · PHTaman TemplerEN

Thank you, Honourable Member for Sabak. I think that is suitable for the State Government's assistance under the first category, namely the Sinergi Prihatin Programme, because among the collaborative programmes that can be offered between NGOs or welfare centres and associations, the benefits will be channelled to the elderly or residents. And I think the format mentioned by the Honourable Member just now, such as a modern pondok or religious study for older persons, may be suitable if it is focused on uplifting the dignity and also the quality of services provided to the elderly. So I think that category can be adapted into a form of State Government assistance named the Sinergi Prihatin Programme. You may submit that paper to my office, and Insyaa Allah we will study and refine it, and if suitable, we will state the collaboration channel together with suitable financial assistance.

Deputy SpeakerEN

The Honourable Member for Sungai Ramal.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Deputy Speaker, question No. 76.

Oral Questions — 76. Public Immunisation Programme for Influenza OutbreakQuestions

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

76. To ask YAB Dato' Menteri Besar:-

What is the government's strategy in the public immunisation programme against influenza outbreaks, and specifically for marginal groups such as foreign workers and refugees residing in Selangor?

Puan Jamaliah Binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Honourable Member for Sungai Ramal, for asking about the government's strategy in the public immunisation programme against influenza outbreaks, specifically for marginal groups such as foreign workers and refugees residing in Selangor. Mr Speaker and Honourable Members, foreign workers and refugees residing in Selangor are not included among the communities or groups eligible to receive vaccination under the influenza immunisation programme, whether implemented by the State Government or by the Ministry of Health Malaysia (KKM). At present, the influenza immunisation programme by KKM is focused on KKM frontline staff and older persons aged 60 and above who have at least one mobility limitation, subject to vaccine stock availability. Therefore, for groups of people not included in that category, including foreign workers or refugees, they are advised to obtain influenza vaccines at the private health facilities that offer them.

Deputy Speaker

Soalan tambahan?

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

The matter I raised, Mr Speaker, thank you for the answer, is because of our concern about the spread of influenza from them. They mix with us every day. They work in their sectors, but they mix, in their workplaces, with local citizens. Is this matter not being taken seriously, for fear that it will spread from them to us? Thank you.

Puan Jamaliah Binti JamaludinDAP · PHBandar UtamaEN

The Honourable Member for Sungai Ramal, let me explain a little. The purpose of giving influenza here is that it is a little different from influenza, or Covid before, where we gave it to all citizens. The purpose of giving this influenza is to help groups with lower immunity. This means that even though they are Malaysian citizens, we only give influenza to the elderly and also to students who are learning from...

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Give vaccine for influenza? Give vaccine, maybe?

Puan Jamaliah Binti JamaludinDAP · PHBandar UtamaEN

Yes, vaccine, sorry. Thank you. But what I want to say is that the vaccine is given to groups with lower immunity, such as the elderly and also students aged 8 and below. This means we are also not giving it so far to those aged above 8, adults and so on. So even Malaysian citizens are given it in a targeted way. So that point needs to be corrected. Thank you.

Deputy SpeakerEN

The Honourable Member for Sabak.

Tuan Sallehen Bin MukhyiPAS · PNSabakEN

Thank you to the Honourable Member, Mr Speaker. My question is number 77.

Oral Questions — 77. Takfiri Offences in Selangor StateQuestions

Tuan Sallehen Bin MukhyiPAS · PNSabakEN

77. To ask YAB Dato' Menteri Besar:-

a)

State the Offences Enactment applicable to Takfiri teachings or practices in the State of Selangor. b)

How many individuals involved in Takfiri ideology have been convicted of offences, and what actions such as detention, prosecution and aqidah rehabilitation have been taken against them?

Thank you, Mr Speaker. Thank you, Honourable Sabak. The question asked has two parts. The first part is to state the Enakmen Kesalahan that apply in relation to teachings or acts of Takfiri in the State of Selangor.

a) The answer is, MAIS has not yet received any case involving the arrest or prosecution of Takfiri offences. The akidah "pembelian" carried out by MAIS at present is on the offences of spreading deviant teachings, insulting the Prophet and applications for declarations that a person is not a Muslim. The provisions that apply in relation to teachings or acts of takfiri in the State of Selangor are provided under Section 6, Enakmen Jenayah Syariah Negeri Selangor 9 tahun 1995, under which Takfir is defined as follows: subject to Subsection (2), a person who says or implies, through words, whether orally or in writing, or by signs, or by visible representation, or by any act, activity or conduct, or by organising, promoting or arranging any activity, or otherwise by any means, that any person who professes the religion of Islam

or any person belonging to any group, class or description of persons who profess the religion of Islam, i. is a kafir (infidel), ii. has ceased to profess the religion of Islam, iii. is not fit or is not capable of being accepted as professing the religion of Islam, or iv. does not believe in, follow, profess or belong to the religion of Islam. Such a person commits an offence and, upon conviction, may be fined not exceeding RM5,000 or imprisoned for a term not exceeding 3 years or both. Subsection (1) shall not apply to, first, anything done by any court or religious authority established, constituted or appointed under or by any written law and vested by written law with the power to give or issue any fatwa or decision on any matter relating to the religion of Islam, or secondly, anything done by any person in accordance with or following any fatwa or decision given or issued by that court or religious authority, whether or not the fatwa or decision is in writing and, if in writing, whether or not it is published in the Gazette.

b) The question asks how many individuals involved in Takfiri ideology have been convicted of offences, and what action has been taken against them. For offences that fall under subsection 6(1) of the Enakmen Jenayah Syariah Selangor 1995 relating to Takfiri, JAIS has received only one report or information, namely on 30 October 2025, and it is still at the investigation stage by JAIS. There are also deviant teachings that have been declared through fatwa or gazetted and found to contain takfir characteristics, among them, firstly, the Ajaran Islam Jamaah, which was declared through fatwa on 24 September 1998; the Ajaran Negara Islam Indonesia, which was declared through fatwa on 31 March 2011; and the Ajaran Hizbut Tahrir, which was declared through fatwa on 17 September 2015. Meanwhile, the special enforcement actions taken against these deviant groups are as follows. Firstly, the Ajaran Islam Jamaah based in Klang, 35 individuals were arrested and enforcement action was taken in 2017. The Ajaran Negara Islam Indonesia is inactive and there have been no arrests so far. Ajaran Hizbut Tahrir in Bangi, Shah Alam and Hulu Selangor, where 22 individuals were arrested and enforcement action has been taken from 2015, 2017, 2018 and 2019. Individuals who were arrested have been charged and convicted of offences, and sentenced to fines and imprisonment by the Syariah Court. Thank you.

Deputy SpeakerEN

The Honourable Member, Bukit Lanjan.

Puan Pua Pei LingPKR · PHBukit LanjanEN

Thank you, Mr Speaker, my question is number 78.

Oral Questions — 78. Selangor Speed PolicyQuestions

Puan Pua Pei LingPKR · PHBukit LanjanEN

78. To ask YAB Dato' Menteri Besar:-

a)

How effective has the implementation of the Speed Selangor policy been in attracting new investors to Selangor?

b)

How does the government ensure that expedited approvals do not compromise the integrity of the process?

c)

What steps will be taken to ensure that the benefits reach local investors and the people of Selangor?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I request that this question be answered together with question 157 from Kota Damansara and question 361 from Balakong. Mr Speaker,

a) The Speed Selangor policy was only launched on 8 October 2025 during the opening of the Selangor International Business Summit at the Kuala Lumpur Convention Centre (KLCC). Since this policy has only just been introduced, it is too early to measure its full effectiveness. The number of approvals through this policy also cannot be stated at this time. The policy will be continued in 2026 and will become the practice of the Local Authorities (PBT) and related technical agencies in processing and considering approvals of development plans in the State of Selangor.

b) The implementation of the SPEED Selangor policy will cover the entire ecosystem of development project approvals. To ensure that the Speed Selangor Policy does not compromise the integrity of the process, this policy will be implemented systematically based on the OAC 3.0 Plus Module, supported by Project Briefing Technical sessions. The SPEED Selangor implementation process comprises four (4) main stages, as follows:- i. Project Eligibility Assessment. ii. Application and Preparation of Supporting Documents. iii. Preliminary Review and Pre-Consultation Process. iv. Approval Decision.

At the initial stage of implementing the SPEED Selangor initiative, the State Government has not set any targets or KPIs for each PBT for this initiative. However, to ensure that every State Authority implements this policy, the State Government will establish a Monitoring and Coordination Committee at the Local Authority level to ensure compliance with the guidelines, identify issues and implementation challenges, and submit improvement proposals periodically to the State-Level Committee. Meanwhile, at the State level, the monitoring of the implementation of SPEED Selangor will be coordinated by the Selangor Implementation dan Performance Monitoring Unit (SIAP) under the Special Committee for Monitoring High-Impact Projects of the State of Selangor.

Basically, the implementation of the SPEED Selangor initiative has the potential to increase investment and the development of strategic industries in the State of Selangor. This determination aims to ensure priority is given to strategic and high-impact projects that support the socio-economic development agenda in the State of Selangor. In addition, the implementation of this initiative will directly have a positive impact on the State of Selangor in enhancing investment and development activities. With the SPEED Selangor policy, the time taken for development approvals can be shortened. This directly helps investors to start their businesses more quickly, reduces financial costs and reduces development issues that arise. When companies can start operations earlier, job opportunities can be offered immediately to local people, as well as economic spillover to local traders around development areas. Basically, the implementation of SPEED Selangor will have a direct impact on the people and investors. The SPEED Selangor initiative will give advantages to the State of Selangor through the following matters: i. Monitoring and coordination of strategic projects; ii. Expediting approvals and business licences; iii. Attracting investors through an image of excellent governance.

The types of development eligible for consideration under the Speed Selangor policy are as follows: i. The erection of industrial buildings in planned industrial areas and in line with land use zones in the Local Plan (RT), including factories, warehouses and logistics facilities that support the technology manufacturing sector and supply chains.

ii. The erection of commercial buildings in planned commercial areas or in line with the land use zones of the Local Plan (RT), covering private hospitals, universities, private educational facilities and technology facilities.

iii. Commercial projects (free standing building), except those with a residential concept such as SOHO or SOVO. For the first phase of implementation, the approach is given specifically to only 2 categories of development, namely industrial buildings and commercial buildings. The scope of the SPEED Selangor Initiative will be expanded in the second phase of implementation, where it will cover other types of development that meet strategic and high-impact criteria, including projects outside the industrial and commercial categories specified in the first phase. Thank you.

Deputy SpeakerEN

Honourable Kuang.

Thank you, Mr Chairman. My question is number 79.

Oral Questions — 79. Bandar Tasik Puteri Community Hall (BTP)Questions

79. To ask YAB Dato' Menteri Besar:-

a)

With reference to House question 2025/Sesi2/#127, the new completion date for the BTP Hall is 07/11/2025 after 3 EOT approvals were granted. When can the hall begin to be used?

b)

With reference to all related answers, construction progress is only 10% for each sitting session of the State Assembly, why is construction progress so slow?

Dato' Ng Suee LimDAP · PHSekinchanEN

Thank you, Honourable Deputy Speaker. The question from the Honourable Kuang, which was also raised during the debate that day, but in my winding up I could not answer in detail. I am now answering in detail on the issue of the construction of the Bandar Tasik Puteri (BTP) Public Multipurpose Hall of Kuang.

a) For the information of the Honourable Member, the Bandar Tasik Puteri Multipurpose Hall is expected to be completed according to the project completion date of 7 November 2025. However, on-site completion is only 78%. The delay in the construction of this multipurpose hall is because there were several work change instructions that had to be implemented on site to improve the functions of the use of this hall. Accordingly, the expected full completion of the Bandar Tasik Puteri Multipurpose Hall is in March 2026.

b) Honourable Member, the cause of the delay on site is because there were work change approvals that the contractor had to comply with, as follows. There are 5, okay,

KPK & APK No. 1 - Addition of "Loading & Unloading" area KPK & APK No. 2 - Addition of RC "Retaining Wall & Drainage" KPK & APK No. 3 - Change of Fixed Louver Screen Panel on the "Drop Off" roof KPK & APK No. 4 - Change from concrete retaining wall to "Natural Slope & Spot Turfing" and related works KPK & APK No. 5 - Addition of Parking Area. The purpose of these work change instructions is to improve the usage space of the hall and to add space for vehicle parking so that parking space can be provided to the maximum for public use. The Council will also monitor and ensure that these construction works are completed according to the new work schedule set, which is March 2026, after five times of work change instructions and so on, because there was a bit of design change, okay, already 5 times, March 2026, Honourable Member. Thank you.

Deputy SpeakerEN

Thank you, Honourable EXCO. There are no supplementary questions. Honourable Members all, the time has reached 11.30 a.m. I hereby adjourn the question session for the next business.

Continuation of Supply Bill 2026, All StagesBill

Secretary of the HouseEN

The next Order of the Day, continuation of the Supply Bill 2026, all stages.

ChairmanEN

Honourable Members all, the House sits as the Committee of Supply. Bentara, please call.... The Secretary.

Secretary of the HouseEN

Schedule B1 Office of the Menteri Besar and State Secretary RM162,013,948.00.

ChairmanEN

Honourable Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Speaker. I wish to refer to page 45, B01 (Item 505000 – Standing Committee on Care Economy).

I certainly welcome the establishment of the Standing Committee on Care Economy. This matter is a very important aspect in the State of Selangor, which is increasingly ageing, and it is very important for Bukit Gasing, my constituency, which may be the most ageing area in the State of Selangor together with Kampung Tunku. In the care economy aspect, there are two (2) types. For the T20 group, those who are capable, the private sector is providing services. When the private sector comes and provides services, it is the Government's duty to pursue a licensing system so that all services provided can be licensed and we can control the quality of services so that no one is cheated and no one falls victim to services of unsatisfactory quality or care of quality. But I am more worried about the B40 group, the group who cannot afford to pay for services like this. If a person has a child with OKU (persons with disabilities) but cannot afford full-time care, if a person has parents who are bedridden at home and cannot afford to hire a full-time carer. Sometimes they are forced to stop working.

I hope the Standing Committee on Care Economy will not only look at the types of services that may exist, because if we look at Singapore or Australia and so on, there are many products that can be introduced to our market. The private sector is indeed actively introducing various care products to the

market, but how do we establish a payment system, a financing system, social insurance (with permission) so that anyone who becomes a victim, anyone who has a need, these care costs can be borne. If the Government does not think of a solution (with permission), if the Government does not have a solution, then those who are fortunate, are fortunate. If I am fortunate, my parents are healthy, I am okay. I do not have excessive expenses. But if those who are not fortunate, how can society help. So far we have relied heavily on NGOs to help those who are less able to afford. But as a Government moving towards 'First World' status, we cannot rely solely on NGOs. We cannot rely on the kindness of donors, but we must establish a system. We all do not know if one day we need this care. We do not know one day when we ourselves become ill and are bedridden in hospital or bedridden at home and need a full-time carer or, you know, perhaps a carer who visits often three times a day. So, what system can we establish to ensure that perhaps everyone pays into a social insurance for whoever becomes a victim, whoever needs it at some point later. This social insurance system finances the care needs required at that time. So for this Standing Committee, I hope that in 2026 the work of this Committee can cover this problem. Be able to think of a solution for the benefit of the people, and if necessary I am always ready to attend and provide help, assistance and service to help find this solution. Thank you for this first matter.

Second matter, on page 49 (563000 - Corporate Division). This matter is perhaps less discussed in the House, but today I would like to take the opportunity to raise an issue that I feel is important as we move from 'Third World' to 'First World', namely our complaints system. We have a complaints system (SISPAA). This complaints system receives thousands of complaints every month from all over Selangor, urban areas, rural areas and so on. However, many problems cannot be resolved, cannot be handled by this system. Complaints that are not resolved mostly come to the ADUN of the Constituency, the Constituency Council Member and the Constituency Member of Parliament. In this House, throughout last week's Budget Session, instead of debating the core Budget matters, much time was spent raising constituency issues, local complaint issues that have not yet been resolved. I am confident that if the Corporate Division, which manages this complaints system, can improve its efficiency, or be given authority, perhaps the officer in charge of the Corporate Division should be an officer of higher rank, JUSA C, JUSA B, so that when they call two or three overlapping agencies that may need to sit at one table to resolve one complaint, that complaint can be resolved. Perhaps the best KPI for measuring the success of the State Government's complaints system is that we must count the number of complaints that enter this honourable House. If an ADUN has to bring complaints from floods to monkeys to the PBT into this House, this means this Complaints Unit has not reached the level of efficiency needed to handle these people's complaints. So I hope perhaps the Government can appoint one of the MMKN Members (State Executive Council) to be responsible for this matter. Can appoint an officer who has the capability, expertise and sufficiently high authority so that they can attract and bring all relevant agencies to the meeting table and ensure the complaint is resolved. I also intend to hold regular meetings with the ADUN Offices in the State of Selangor. Perhaps it can be done by PBT or by district so that we can have a platform to follow up on the complaints made by residents in my office. Every week we receive complaints. Often we will ask, have you lodged a complaint with SISPAA? Yes. Complaints related to JKR, complaints related to PBT and so on have been lodged in SISPAA but still have not been resolved after two or three months. When residents come to the ADUN Office, we have to accept these complaints and we have to forward them to the relevant officers. I hope this system at the SUK can be improved so that the work of this State Assembly is not tied up with various complaints that can be resolved outside. Thank you, these are the two issues I wanted to raise for B01.

ChairmanEN

Thank you, Bukit Gasing. Is there an explanation from the Government side? If there is none, that is fine. Schedule B1, that is the sum of RM162 million.. Do you want to answer? Do you want an explanation from the Government side or do you want me to continue?

Puan Anfaal Binti SaariAMANAH · PHTaman TemplerEN

Thank you, Honourable Bukti Gasing, for the matter concerning the Social Insurance System. In the discussions at the Selangor International Care Summit, several proposals relating to a more sustainable financial model were discussed. Therefore, the focus of the Standing Committee on Economy for care in 2026 is on a more sustainable financial model. This means we do not rely only on government grants or hope for the goodwill of donors, but rather a model of cooperation between the Selangor State Waqf Corporation (Perbadanan Wakaf Negeri Selangor) and the types of models proposed by financial researchers. We hope that with these care costs, we will realise the care diamond, namely a model in which the sharing of care is shared between the Government and the private sector, between the community, and also with family members. That is all, for your information.

ChairmanEN

Thank you, Honourable EXCO.

Dato' Ng Suee LimDAP · PHSekinchanEN

I respond for the second time regarding SISPAA and this public complaints matter. Thank you, Honourable Bukit Gasing, for the issues raised, where under the SISPAA system, complaints are often lodged but the action taken is not significant. Some act, some do not act. Indeed, in any system whatsoever, a complaints system in particular has pros and cons. Sometimes it is more effective, sometimes there is less monitoring and so on. However, I take note of the proposals from the Honourable Member, relating to the need to appoint an officer or a person in charge who can coordinate with the various departments, not only departments, agencies, external agencies and so on, so that issues that arise and complaints can be resolved within the stipulated time period. And there is coordination. Otherwise, it may be that it is placed in two departments, one department between internal (domestic), it needs the help of an external department which it cannot do. This is what hampers efforts to resolve problems at the ground level, and eventually the complaints reach the Office of the State Assembly Member (ADUN) and also the Members of Parliament. I take note of this. I myself have encountered the same matter, therefore I will ask the State Economic Planning Unit (UPEN) SPBT to coordinate whether it is appropriate to appoint an officer, whether the Standardisation and Coordination Committee from the new SGP and so on, to be truly in charge of the SISPAA system among these 12 local authorities (PBT). This is a suitability that we can explore and think about. So this matter I will take note of, so that we can try to implement it in order to reduce issues relating to complaints in the SISPAA system, and to reach an optimum level in resolving the people's problems, because the PBT is closest to the people. A delivery system that is service-oriented, efficient and fast will produce a positive impact on the State Government, and thank you to Bukit Gasing. That is all.

ChairmanEN

Schedule B1, namely the sum of....

Honourable Speaker, another....

ChairmanEN

Earlier I had opened it up for explanation. The Government has already given its explanation. Schedule B.1, namely the sum of RM162,013,948 for Head B.1 Office of the Menteri Besar and State Government Secretary, the State Government Secretary becomes part of the schedule.

Honourable Members who agree, please say Yes.

Honourable Members

Ya.

ChairmanEN

Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.2 – Miscellaneous Services RM75,421,000.00

Chairman

Bukit Gasing

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Chairman, I have just one matter. Referring to page 54 (505000-Library). I am not sure who can answer this matter. I just want to record this statement: Before the Covid pandemic, there was one branch of the Selangor Public Library Corporation (PPAS) in the State Assembly constituency of Bukit Gasing, which at that time was located at Jaya One in a shopping mall (with permission), but during the Covid pandemic this library, this branch, had to close due to rental problems and so on there. And after the pandemic was long over and libraries were allowed to reopen, for years this branch still has not been reopened. I have brought proposals for new locations to the management. I have given a proposal for a location without rental costs to the library management, but unfortunately, until today the PPAS management still has not reopened the only branch in the State Assembly of Bukit Gasing. Throughout Selangor state there are more than 100 library branches, so I think there are some ADUN areas that have two or three library branches, but in the Petaling Jaya area there are very few; there is one in Taman Medan, but in Bukit Gasing State Assembly there is none since the Covid pandemic, before that there was. And the branch in the Bukit Gasing State Assembly has a quite large number of visitors, and it is actively used by residents of Bukit Gasing. So I hope the Government can reopen the branch that has been closed for several years as soon as possible.

Secondly, regarding the management of this library. I welcome the various digital products introduced at the Raja Tun Uda library in Shah Alam. It has indeed become an attraction for all visitors, especially children; there is a 3D theatre, there is virtual reality (with permission), there is sketch drawing where children can draw and colour on a large screen. However, the costs imposed on users are rather expensive, for virtual reality RM10.00 for 15 minutes. Sometimes I see at this library, a child plays for 15 minutes, which is not enough, he wants to play more, and parents who have three, four or five children have to bear large costs. I see that perhaps if these costs can be reduced so as to give access to ordinary groups of society, the B40 group, to these digital products, it would be very good. I also feel rather sorry seeing when parents cannot afford the payment and have to tell their child they cannot, only once, after 15 minutes they cannot continue because it is rather expensive. If it is RM15.00 for one child, for five children it becomes RM75.00 for just 15 minutes, so I hope the management of the State Government Library can reduce these costs. I appreciate that membership is free, and the cost to borrow books is free, that is very good. I hope we can also align the cost for digital services, so that we give access to these digital products to the B40 group. In the last two or three times I went to the library at this time, the level of usage was very low, rather empty, and I understand that when the cost is high, the usage is empty.

I take note that, as an ADUN, I am often offered that my child can use it for free. I do not ask for services for myself, but I see hundreds of library visitors every day, so that those children can experience these digital products, perhaps a payment of RM3.00 or RM5.00 would be sufficient. Thank you, my two proposals for the Selangor State Library Management.

Chairman

Permatang.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Thank you, Mr Speaker. Mr Speaker, I would like to refer to page 54, the same as Bukit Gasing just now, under Object Code 420000 Selangor Public Library Corporation (PPAS). I would like to draw the attention of the House to the Tanjung Karang Library, because in Tanjung Karang we have a library that has been under maintenance not only for years but for dozens of years, and until today it still has not been completed, Mr Speaker. The reason I raised this issue, Mr Speaker, is that in my view we in rural communities really need a complete library, which is also important for the education of our children in rural areas. We also, Mr Speaker, when I look back at this issue, we see this problem where contractors keep changing and so on, so I feel it has been almost more than ten years, from when I was small until now the library still has not been completed, still not completed. So Mr Speaker, this is important because we in rural areas need a complete library that is also technologically equipped, and like the one in the city, which has a digital space, learning rooms and so on.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Boleh mencelah?

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Please proceed, Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

I hear many voices saying the issue raised by Tanjung Karang is a development issue, not management. But it can also be, indeed that project is a development project, perhaps a Development Motion can be raised, but what can be linked is management, because in operating expenditure, the salaries of officers that we bear must be more efficient in project management, because what I hear and have heard for several years, the Tanjung Karang library project has been delayed for a long time even though it has started. But it is a development project that can be brought up under a Development Motion.

ChairmanEN

This is for management only.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Alright, thank you, Mr Speaker. So I hope, yes, perhaps we can, the management of this library, we can speed it up so that it can operate more quickly for the use of Tanjung Karang.

ChairmanEN

Thank you. I ask the Government, if there is an explanation, or I will proceed. Schedule B.2, namely the sum of RM75,421,000.00 for Head B2 Miscellaneous Services becomes part of the schedule. Honourable Members who agree, please say Yes.

MEMBERS OF THE HOUSE: Yes.

Deputy SpeakerEN

Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.3 Selangor State Legislative Assembly, RM34,491,700.00.

Chairman

Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Chairman of the Meeting, page 57, Code 506000 State Assembly management. I would like to bring up one issue, one proposal in management, namely regarding the Committees of the House. In the Selangor State Assembly, we are very advanced compared to most other State Assemblies, and compared to the Dewan Rakyat, we first established various types of committees: PBT committees, ABAS, Land Office and so on. And among us, that is correct, the name is also the same as their committee. In our current setup, there are ten committees working hard to monitor various issues in the State of Selangor, and the financial problem of these committees is increasingly emerging. In Parliament, RM5 million has been allocated for the operations of 10 Committees. Parliament started later than us in establishing all committees, only in the last few years; from 2009, 2010 we had already started establishing all these committees. But now Parliament has leapt ahead of us, where a sum of money has been allocated specifically for committee operations. Money allocated to committees can help committee operations in hiring external experts to give advisory services, can conduct surveys, for example, we want to hire Merdeka Center and similar institutions to conduct surveys on topics to be given recommendations to the State Government. If committees have financial allocations, they can help such operations. I am not asking for up to 5 million like in Parliament, I only propose perhaps around 500,000, one tenth of what is allocated in Parliament, to help committee operations so that we can nurture democracy in the State of Selangor. So that is all my proposal for B03.

Speaker.

Chairman

Kota Damansara.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Thank you, Speaker. I raise page 57 for item 506000 Code 12000 for Fixed Allowance. Honourable Deputy Speaker, what I am raising is the allowance for officers at the State Assembly service centres. The allowances for ADUNs, I think others will raise. But however, if we look at the State Assembly offices, their salaries have been allocated at two thousand one a month, and if EPF, SOCSO and so on are deducted, their actual allocation is about one thousand seven hundred, because if twenty ringgit is taken from the ADUN, it becomes one thousand eight hundred.

So I think there is a need for the Government to consider raising their salary scale to at least two thousand five hundred, and even if deductions are made, it would still be within the range of two thousand, because we see these service centre officers work day and night. That is the first point. Secondly, if we see, they also work moving to assist various types of activities and programmes proposed by the State Government. They are among those who carry the policies and spirit of the State Government, so I request the State Government to consider raising the salary scale because as far as I recall, this two thousand salary has started since 2008 until now in 2025, the salary scale has remained at up to two thousand ringgit a month. So I ask the Government to consider for everyone whether it can be increased by at least five hundred as a start, so that they can get some relief indirectly, thank you, that is all.

ChairmanEN

Honourable Kuang.

Thank you, Chairman. I strongly agree with Kota Damansara, but I feel Kota Damansara should also be grateful because they received it, while we in the Opposition did not get it. So if possible, please include that proposal as well, so that what is received by the State Assemblymen of the Government, if we cannot get an additional RM500, if we get the basic one we would be very grateful, thank you very much.

ChairmanEN

Is there an explanation from the Government?

Dato' Seri Amirudin Bin ShariPKR · PHSungai TuaEN

Thank you, Honourable Member. Two matters have been raised. The first, from Bukit Gasing, concerns the management of the House. I would like to know how the House management can become more active and more independent, or better organised, in line with the needs and requests of the House management, including Members of the House. One key change in Parliament was when they began tabling a law called the Parliamentary Administration Act, or the Parliament Act, which had been lost for decades due to several changes. This is among the reforms at the Federal level that have opened up a wider space.

As has been mentioned, we have started several steps of change. One step we have not yet fully completed is the House Management Enactment, which we can table within a certain time. So I hope the House Management and also the Speaker's office can begin planning, at least for the next session, not session, let us say next year, in the next session for next year, to gazette or bring in this House Management Enactment, which has been delayed for a long time because we did not want to conflict or be too contrary to what is happening at the Federal level. Why? Because it involves the Constitution and so on. So any law that is governed or tabled at State level must not conflict with the Federal level, otherwise it will become, will become more, will not function, like the Anti-Hopping Law that we debated at one time. So what this means is that the key is not for us to add officers and so on. However, on the State side, I believe we have already established a department which we call the Selangor Research Institute (SRI). That is really where the State's initiative lies, so that we no longer rely on consultants to do research for us. Over time we will have fellows and our own research, and perhaps this department can be linked in the future. That is the first point.

But the second point: under the Speaker's allocation, we actually have an allocation for researchers. Researchers are indeed under the Speaker's allocation, and I believe the Speaker can discuss with the Committee Chairpersons to settle or untangle that matter, Honourable Member. That is the first point. Regarding House management, researchers, the activeness of committees, and also the efficiency of committees in issuing reports that can help monitoring of the State Government.

The second matter raised by Kota Damansara and also Kuang concerns the salaries, emoluments or wages of our officers, especially at the service centre level. I have examined several matters. There are two options, Honourable Member: either we increase the salaries or wages directly, or we add allocations that can be used at the service centres, where you may add officers or add wages or allowances for officers. For the State Government at this level, we ensure that they are not below the minimum wage. So far, after all deductions, they are still slightly above the minimum wage, although I know there are still certain shortcomings. So we are considering two options. Recently, the Committee Chairpersons met with me. Among the matters they asked about was the increase of allowances for these officers. And, or, add office allocations. So if the office allocation is increased, from a certain amount that we currently provide, it can benefit all our officers or the work of our officers at the Service Centres respectively. Apart from that, if we want to create a new salary scale, it will take a longer time. So if this year, we start this year, we start with that allocation so that our office allocation can be increased now. Therefore, you may add officers on certain contract terms, or in terms of work or administration.

There is another request. The second request concerns officers being appointed directly by the Service Centres. I think we have to evaluate and weigh this carefully, because these officers also need social protection such as SOCSO, the Employees Provident Fund (KWSP) and so on. If it is managed directly by the Service Centres, I am not saying I do not trust you, but I am afraid of oversights or omissions. In fact, you may be subject to an offence for employing people without making the mandatory deductions for the KWSP and SOCSO, which provide social protection for them. So far, this has been protected or safeguarded by the Centre, by the House Office, although I know the House Office has to manage a large amount. Nevertheless, I think for now we need this first. What we may be able to add is the office management allocation, which you can use to add officers or add certain officers, to meet the burdens and also the requests and feedback from the public, who still make the Service Centres one of their reference points, or a centre where they lodge complaints, and so on. Thank you.

ChairmanEN

Schedule B.3, namely the sum of RM34,491,700.00 for Head B.3, Selangor State Assembly, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.4, State Treasury, RM183,295,073.00.

ChairmanEN

Bukit Gasing. Please go ahead.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Chairman. Referring to page 60, Administration and Finance, Code 505000. I am proud to be a State Assemblyman in Selangor, where we are the first state to make the Freedom of Information Enactment. I am proud, I am a State Assemblyman in Selangor, where we were the first to establish House Committees to monitor the work in the House, the work of the Government. Many reforms began in Selangor and were then followed by other states and Parliament, which followed in the footsteps of the State of Selangor. However, perhaps it is time for us to carry out the next reform, with respect. What is the next reform that may become a milestone for the Administration? I intend, under this Code B04, to be State Government expenditure. If we look in the first world, for example in America, all State Government expenditure can be accessed through one website. We have open data where people can see all expenditure according to Department. We can analyse expenditure according to area. For example, how much the Government has spent in Sepang, or in Kuala Langat, or in Petaling Jaya. We can see what kind of projects the Government has awarded. We can see information on the contractors who obtained projects in Sepang, in Banting, in KKB and so on. This open data, where all State Government information is available, I think is not difficult for us to do. The information is already in our internal systems, the information is already available. The only question is whether we want to put this information on a website so that it can be seen and examined by the people and by journalists. And today I propose that the Selangor Government take a progressive step to display all this information on a dedicated website, so that the people can see State Government expenditure every year, perhaps for the past 10 years, and see the types of projects spent on by the State Government. They can see project performance: which ones are late, which ones are completed on time. And they can see what has been developed in the areas and towns where they live. This is not new; many states in the world have done so. In Malaysia, as far as I know, no state has done so. I hope it is not another state that becomes the first. I hope Selangor will be the first to do this. That is all, thank you.

ChairmanEN

Is there an explanation from the Government?

Dato' Seri Amirudin Bin ShariPKR · PHSungai TuaEN

Thank you, Honourable Member for Bukit Gasing. I believe the Government is moving in that direction, towards achieving an Open Government, or an open Government. Part of these efforts are, to some extent, translated into the Rancangan Selangor Pertama (Selangor First Plan) Dashboard, because it highlights what percentages have been achieved and some decisions that can be made. I myself have asked that this Dashboard can be made more actively public to the community, so that the community can access it and know. Apart from researchers or other parties, all parties including the opposition can see the extent of the Government's efficiency in carrying out its responsibilities, apart from asking or enquiring in this House about certain developments or the implementation of certain measures.

Honourable Member, we are also implementing. There are some constraints. Among these constraints, as I mentioned earlier, are the laws at the Federal level that still encircle or still monitor some of these actions. Among the matters we must observe carefully, apart from what we mentioned about FOI, is the Official Secrets Act. The Official Secrets Act still applies. So the FOI law cannot supersede the Official Secrets Act. That is a basic principle, which I think in this lower House we must respect what happens at the Federal level, or the changes in law at the Federal level, and so on.

Regarding the Government's measures to publish or implement several digitalisation processes, I think this has already happened. In fact, I have also begun to request it. For example, KDEB Waze. Many complaints are usually referred. They cannot make collections. Yet the collection has been made, because of the time difference. He wakes up at 8, does not see the lorry arrive until 2 in the morning. Yet the lorry entered at 6 in the morning. According to the censors that we install in our lorries, they actually entered early, and there are examples of those movements. We also consider other aspects such as security, because vehicles that move, for example KDEB vehicles, are also open to open competition, open to sabotage, open to acts of treachery and so on. So those considerations are being taken into account so that we can ensure what time it entered and so on. That can be explained in terms of timing and also based on data. That is just one example.

But the reference that the Honourable Member raised earlier was about the list of contractors, the list of projects that have been implemented, what percentage has been implemented. We have to look again at the Acts or laws related to confidentiality or personal protection and so on, because all this will open up various questions. Yes, we want everyone to know who is responsible. Do these people have networking and connections with certain people? Why do they always get it? These are examples that frequently arise in our society, and, as I mentioned, there are concerns about sabotage and so on, including company secrets, which we also cannot disclose, because for the protection of personal information I think we need to have certain limits. Which ones received the date? When did they receive it? When was it completed? Why was an EOT given? All these are matters that we can highlight in the future, and we have included them in the Rancangan Selangor Dashboard. So if they are completed, we can publish more and expand, especially for big things, Honourable Member. It would not be that a project to replace a drain cover or replace a drain lid must be highlighted. That would cause problems or be too many. And our analysis regarding FOI, Honourable Member, is that it does not cover everything. Of the many FOI requests, most are not for information of this kind, as I mentioned in the previous sitting. Most requested is information on marital status, because a person wants to get married, a person is afraid that they have already married twice. That is true. Many are about marital status. Most of these statuses are two or three years old in our data. So I see that the interest in that is not that great, but at certain times people apply and people ask and there are certain requests. This means it is more of a trigger for issues than real monitoring of implementation and Government openness. But our commitment to an open Government is certainly one of them. We highlight it in the Rancangan Selangor Pertama. We evaluate everything, because I do not want us to breach several laws that have not yet been amended or reformed at the Federal level, such as the Personal Data Protection Act or the Personal Information Act, which involves many parties who will be affected. Thank you.

ChairmanEN

Schedule B.4, namely the sum of RM183,295,073.00 (Ringgit Malaysia: Satu Ratus Lapan Puluh Tiga Juta Dua Ratus Sembilan Puluh Lima Tujuh Puluh Tiga) for Head B.4, State Treasury, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.6, Contribution to the State Development Fund, RM1,370,000,000.00.

ChairmanEN

Schedule B.6. Namely the sum of RM1,370,000,000.00 for Head B.6, State Development Fund, Selangor State Assembly, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.7, State Public Service Commission, RM1,794,168.00.

ChairmanEN

Schedule B.7, namely the sum of RM1,794,168.00 for Head B.7, State Public Service Commission of Selangor, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.8, Department of Agriculture, RM24,101,000.00.

ChairmanEN

Schedule B.8. Namely the sum of RM24,101,000.00 for Head B.8, Department of Agriculture, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.9, Land and Mines Office. RM38,718,950.00.

ChairmanEN

Schedule B.9. Namely the sum of RM38,718,950.00 for Head B.9, Land and Mines Office, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.10, Forestry Department, RM32,105,020.00.

ChairmanEN

Schedule B.10. Namely the sum of RM32,105,020.00 for Head B.10, Forestry Department, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.11. Mufti Department. RM5,425,594.00.

ChairmanEN

Schedule B.11. Namely the sum of RM5,425,594.00 for Head B.11, Mufti Department, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.12, Public Works Department, RM146,145,676.00.

ChairmanEN

Schedule B.12, namely the sum of RM146,145,676.00 for Head B.12, Public Works Department, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.13, Irrigation and Drainage Department, RM139,501,366.00

ChairmanEN

Schedule B.13, namely the sum of RM139,501,366.00 for Head B.13, Irrigation and Drainage Department, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.14, Selangor Islamic Religious Department, RM408,987,860.00.

ChairmanEN

Schedule B.14, namely the sum of RM408,987,860.00 for Head B.14, Selangor Islamic Religious Department, forms part of the Schedule. Honourable Members who agree, please say "Yes". Honourable Members who do not agree, please say "No". Agreed.

Secretary of the HouseEN

Schedule B.15, Department of Social Welfare, RM 28,057,000.00.

Chairman

Ada? Ok...

Thank you, Honourable Speaker. I would like to take part in the debate on B...

Chairman

B.15.

B.15 Code 505000 Administration and Finance. I would like to debate the allowance for PDK Supervisors. Sorry, they did not come out for the "Monday Blues". The PDK and the public know that the allowance we have set for PDK staff today is RM1,200. According to my check with JKM through the JKM Director, we have 65 PDK Centres in the State of Selangor and 450 Supervisors, and today we are facing a very large number of persons with disabilities (OKU). For the information of all Honourable Members, in operating PDKs we do not only handle participants or students sent to the PDK. Some come to the PDK daily. Some come twice, three (3) days or two (2) days a week, and some also register with the PDK but, because places are rather limited or because their condition, these OKU, are bedridden at home. So this will give PDK Supervisors room to go to the homes, and for that reason, when we consider the allowance amount, which is rather small and low, it is somewhat burdensome or difficult for them to carry out service beyond, their existing core duties. I request that we consider, if possible, because among the 450 PDK Supervisors, if we could raise it from RM1,200 to RM1,700. We need an additional RM2.7 million, and I think PDK Supervisors today are also not included in the group that will be given the BKK assistance that is announced every year under the Selangor State Government. This is because they are included in the group that JKM gives contributions or assistance to NGOs. The NGOs that operate their respective PDKs appoint and appoint supervisors in their respective places. So, they are not included in the BKK group at all. So I hope that if we can consider, firstly, the increase in allowance from RM1,200 to RM1,700, the national minimum wage level that we have set, or perhaps we could consider other methods, but I will go for the first option first. The second option, if we can consider BINGKAS or other assistance that can also cover their daily needs. If we could give BINGKAS RM300 a month, perhaps from RM1,200 we could consider raising it to RM1,500 with BINGKAS assistance, but our first choice is to raise their allowance and, in line across the national level, raise the allowance from RM1,200 to the minimum level of RM1,700. I also assume and envisage that if the number of OKU increases every year by 10 thousand each year for the State of Selangor alone, today we have 147 thousand, next year it increases again and again. So that number will continue to grow. Given that commitment, I request that the Government, if possible, consider

the allowance increase for 450 PDK Supervisors at 65 PDK institutions. Please be considered by the Government. Thank you.

ChairmanEN

Yes, Honourable Subang Jaya.

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Mr Speaker, Subang Jaya also wishes to touch on B.15, especially on the training allowance for JKM staff. Last year, in Subang Jaya, we once handled a complaint case of child abuse that happened at a taska (child care centre). So, during the investigation it was found that there were procedures handled by JKM officers that were unsatisfactory, which led to trauma for the taska and also for the parents. For example, the child was taken to hospital without the parents' knowledge, yes. So, when we raised this matter with JKM, to understand the challenges faced by their side. We were informed that there is a shortage of staff, and the rotation for that training is only twice a year. So it is not the fault of JKM, but this is a shortage in terms of resources, for which we as the State Government have to be responsible. So indeed today, overall, I see that there is an increase in terms of management from RM15 million last year to RM20 million for next year. So, I hope that in terms of management for training purposes, internally this matter will be given specific pressure so that such incidents will not be repeated, thank you Mr Speaker.

ChairmanEN

So now I invite, if there are no more State Assembly Members who wish to debate, I invite the EXCO, if they have anything to wind up? Yes, Honourable Taman Templer.

Puan Anfaal Binti SaariAMANAH · PHTaman TemplerEN

Thank you, Honourable Batu Tiga, for raising and championing the fate of PDK or Community Rehabilitation Centre staff, which is a paper that has been raised before but further discussion needs to be reviewed again because it involves operating expenditure, whereas assistance for welfare from the Department of Social Welfare (JKM), as a federal agency in the state, involves positions in the state. Even so, I take note that the current minimum allowance is RM1,200, and RM1,500 is below this minimum wage level, due to the services provided by the staff being half-day in nature, and we will carry out a module and review. I think through the Selangor Care Network, which was established or launched during the Selangor Care Townhall at the care summit, where we see that most NGOs as operators of these community rehabilitation centres raised the issue of the need for reform or change in the way they are managed and so on. So I take note for further discussion.

Meanwhile, the debate by Honourable Subang Jaya regarding the shortage of JKM staff, the Department of Social Welfare (JKM), this matter is something very urgent, and I think she needs to raise it with the Federal Government for the addition of positions and so on, and also the related emoluments.

ChairmanEN

Schedule B.15, namely the sum of RM28,057,000.00 for Head B.15 Department of Social Welfare (JKM), becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed to.

Secretary of the HouseEN

Schedule B.16, Department of Town and Rural Planning RM11, 634,000.00

ChairmanEN

Schedule B.16, namely the sum of RM11,634,000.00 for Head B.16 Department of Town and Rural Planning, becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed to.

Secretary of the HouseEN

Schedule B.17, Department of Veterinary Services RM20,858, 300.00.

ChairmanEN

Schedule B.17, namely the sum of RM20,858, 300.00 for Head B.17 Department of Veterinary Services, becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed to.

Secretary of the HouseEN

Schedule B.18 Petaling District and Land Office RM21,630,027.00.

ChairmanEN

Schedule B.18, namely the sum of RM21, 630, 000, 027 for Head B.18 Petaling District and Land Office, becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed to.

Secretary of the HouseEN

Schedule B.19, Gombak District and Land Office RM21,555,300.00.

ChairmanEN

Schedule B1.9, namely the sum of RM21,555,300.00 for B.19 Gombak District and Land Office, becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed to.

Secretary of the HouseEN

Schedule B.20, Klang District and Land Office RM21,850, 700.00.

ChairmanEN

Yes, Honourable Pelabuhan Klang, please.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, page 137, Code 52500 Land Management. Pelabuhan Klang wishes to ask what the next and further action is against the staff of the Klang Land and District Office who were involved in the illegal transfer of land ownership. Land measuring 9.4 hectares, valued at RM7.1 million in early 2025, and whether all of these people are still serving at the Klang Land and District Office, and if there is any action, what action has been taken against them, and whether there are other cases apart from the cases that arose early this year, have other cases occurred? Because we are informed that in Klang there are indeed many problems with dubious land status. Secondly, Mr Chairman, regarding, if I may say, as we are aware, the Federal Land and Mines Office is now leasing out federal land that is not managed or no longer developed, and it has happened in the Klang district where at a school site, not just one, there are several school sites that have been leased to companies classified as eligible but not in accordance with the land use zone or the original land use. Intended for a nursery, but then permanent buildings were constructed, such as at Bandar Botanic, and until now these buildings still remain even though the lease has been terminated for the tenant because of breaching the terms of the land use agreement or land lease. I would like to propose in this honourable House that if the Federal Land and Mines Office wishes to lease federal land to any party or company applying to use the land while it has not yet been developed, it must involve the staff or the District Officers from the Klang Land and District Office so that they can provide their views before an application is approved. Likewise, I request that the Federal Land and Mines Office also invite and obtain comments and views from the local authority (PBT), such as the Klang Royal City Council (MBDK), so that they can provide their views before it is approved.

If comments and views are not obtained from the Klang District Officer and also the Datuk Bandar of MBDK or the Klang City Council, then these applicants, after obtaining approval or a letter to use the land, may use it as they please without referring back to the Klang Land and District Office and also to the Klang Royal City Council, just as the planning permission application is not made by applicants who have obtained approval to use federal land that has not yet been developed. So once again, I request that this issue be given serious attention so that the incident that happened in the Klang district, where school sites were developed with permanent buildings whose owners are unknown and who would demolish those buildings if a school is to be built in the future, is not repeated. That is all, Mr Chairman, from Pelabuhan Klang.

ChairmanEN

Yes, I invite the Menteri Besar.

Dato' Seri Amirudin Bin ShariPKR · PHSungai TuaEN

Yes, thank you. I do not have complete information regarding the case raised by Honourable Pelabuhan Klang, but I will present it to him at another time or in the information that we will set. But on the administrative side we have disciplinary procedures, yes Honourable, if a case of offence is detected, and if it involves a criminal case, the officers concerned will certainly be detained or action will be taken. For now, all of the 7 officers mentioned, from the information we have received, have been removed from the Klang Land and District Office so that they are no longer involved. And this is actually not one case, Honourable, because there are several more complaints involving land overlap and so on. Furthermore, the Public Service Department (JPA) and so on need to carry out examination or investigation as for the department's action. If it involves a crime, we will hand it over to the authorities to take action against the officers concerned.

Secondly, this matter has already been dealt with since 2015 and 2016. What it is, for any land that we have submitted to the PTP, usually land for schools, land for fire stations and so on, is handed over to the Federal Land Administrator (PTP). So, that means we place a restriction on its use. The restriction on use is for the purpose of a school, meaning it cannot be used for anything else. If it is a fire station, it is only for a fire station; if it is for a hospital, only for a hospital, to prevent land from being mortgaged or sold to other parties. We have done that after 2015, 2016 right up to today. What happened, the incidents or matters recorded by the Honourable Member just now, the land may have been given to the PTP before 2015, 2016. So the land is still in that possession, but there is another restriction, Honourable. The restriction is that for any development action on that land, they need to obtain approval from the Local Authority. And that is where I think the Local Authority can impose several conditions or reject development applications in those places. So this has a mechanism, namely the PBT itself can take action, or something that violates the zone can be rejected or

take follow-up actions and further actions. Because even though the land is our land, if it is outside the zone, it must apply to the Council. If it builds permanent buildings, it must apply to the Council; if it is developed without the Council's permission, the Council has the right to seize or demolish those buildings, including additions to houses or extensions, which in fact have happened a lot and have caused drainage problems and flow problems in several localities and areas. I think the PBT has taken firm action. So if there is an assumption that it is outside the zone, not clear on approval from the Local Authority, action can still be taken regarding that matter. The right to lease it, to rent it out and so on, is beyond our control because we did not emphasise the restriction on use. After 2015, 2016 we placed restrictions on use, and there are no longer certain cases where the land was taken and then used for other purposes. Worse still, used for commercial purposes that do not bring benefit, whereas we do not have enough schools, we do not have enough police stations, we do not have enough fire stations and so on. This is a dilemma sometimes, Honourable, because the dilemma is, sometimes allocations from the Federal Government have not arrived; school construction requires the Federal Government. But who is to maintain in between? That is what is being questioned. Whether we lease it for maintenance, here I think there is that gap, and sometimes there are parties who take advantage of these matters involved, thank you.

ChairmanEN

Schedule B.20, namely the sum of RM21,850,700.00 for Head B.20 Klang District and Land Office, becomes part of this Schedule. Honourable Members who agree, please say Yes. Those who do not agree, please say No. Agreed to.

Secretary of the HouseEN

Schedule B.21 Kuala Langat District and Land Office RM21,285,739.00.

ChairmanEN

Yes, Honourable Morib, please go ahead.

Tuan Rosnizan Bin AhmadBERSATU · PNMoribEN

Thank you, Mr Chairman. I take part under the heading Code 525000 Land Management. I would like to take note of the management of land with the issue of lot lidi and without status, which I think must be taken seriously, with the situation not only in Kuala Langat but perhaps across the whole of Selangor, which I think is increasingly worrying because there are also landowners who wish to obtain titles but there is a problem at the KM level. So I request that the State Government take this seriously, and I think this matter may also be brought to the Committee, and I request from the authorities to take up this matter, which increasingly involves many of these people who buy lot lidi held under trust arrangements. And secondly, I think this matter also needs to be resolved, I

think before, because land in Selangor is increasingly crowded. So that is why I request views from the Selangor State Government, thank you.

ChairmanEN

Yes, if there are any.

Dato' Seri Amirudin Bin ShariPKR · PHSungai TuaEN

Thank you, Chairman. Regarding these lidi lots, I feel that this is not only something Morib has raised. Earlier, Dusun Tua also raised it, and in fact it has been raised by many parties, because it has had a very serious effect on land ownership, and it will have even worse effects on the parties concerned, particularly on land ownership rights. Therefore, at the earlier stage, what we have done to prevent the lidi lot incidents from happening is to block the PA, or power of attorney, from being given to any party. Any application for a PA has been rejected at the early stage so that lidi lots do not happen again. However, unfortunately, because of information and knowledge about these lidi lots, the problem has arisen again. Since 2018, in fact, we have rejected these trust bond registrations, and we will no longer allow them, so that people are not cheated into buying lidi lots. For that reason, I feel these cases have decreased, but what is happening is that many developments are built as houses on one site and then the plots are sold without any trust holding. The way to control this is through the planning permission (KM). That is, KM is not issued. When KM is not issued, it means the construction is considered unlawful construction. When construction is unlawful, in fact they are not even eligible to sell or transfer the units to other people. This is the issue, Honourable Member. We have found that since long ago, whenever there is a trust bond letter, which is called a PA as just mentioned, that is in fact the door through which lidi lots are opened. So when we stop this trust bond, and indirectly these lidi lots have decreased somewhat, although there are still many players operating down there, selling these lots without separating or subdividing the land, and this may eventually cause problems of inheritance, ownership and rather high costs, especially for constructions.

Because if they want to carry out a housing project on their own, say there is a project on their site, there is a way to do it. The way is to come to the Council, submit and use a planned and organised development programme, and only then can sales and so on be carried out using certain methods. Even then, the land status is used. Sometimes the land used is, for example, agricultural land, so it is not easy for them to do it. That is why, when they want to go to KM, that is the restriction, and that is where we can stop them from taking action. I take note, and we will ensure that these lidi lots are eliminated as well as possible, but it is not that easy, Honourable Member, because there are still parties offering prices that are very inconsistent with current prices, which people say is to help the Malays, and so on. In the end, everyone is cheated, and in the end those rights are not obtained, or the ownership rights are obtained only in part, each according to their own share.

This is the reality, especially in agricultural land areas, particularly in areas a little far from urban areas or development areas, and with offers that seem to be ownership of bumiputera land, Malay reserve land, at prices that are very cheap compared with the actual price set by policy. In fact, there are many cases where, after such an incident, the parcels cannot be subdivided and so on. The heirs are not informed, and in the end the heirs claim the whole lot, and the whole transaction may be regarded as an invalid transaction or a transaction that cannot be recognised. So, we are fully aware of this, and we will address this problem from time to time. Thank you, Mr Chairman.

ChairmanEN

Schedule B.21, namely the sum of RM21,285,739.00 for Head B.21, District and Land Office of Kuala Langat, becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.22, District and Land Office of Hulu Langat, RM21,177,438.00.

ChairmanEN

Schedule B.22, namely the sum of RM21,177,438.00 for Head B.22, District and Land Office of Hulu Langat, becomes part of the Schedule. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.23, District and Land Office of Sepang, RM14,689,005.00.

ChairmanEN

Schedule B.23, namely the sum of RM14,689,005.00 for Head B.23, District and Land Office of Sepang, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Secretary of the HouseEN

Schedule B.24, District and Land Office of Kuala Selangor, RM19,747,459.00.

ChairmanEN

Schedule B.24, namely the sum of RM19,747,459.00 for Head B.24, District and Land Office of Kuala Selangor, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Secretary of the HouseEN

Schedule B.25, District and Land Office of Hulu Selangor, RM18,818,040.00.

ChairmanEN

Schedule B.25, namely the sum of RM18,818,040.00 for Head B25, District and Land Office of Hulu Selangor, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Secretary of the HouseEN

Schedule B.26, District and Land Office of Sabak Bernam, RM18,390,172.00.

ChairmanEN

Schedule B.27 (B.26), District and Land Office of Sabak Bernam, namely the sum of RM18,390,172.00 for Head B.26, District and Land Office of Sabak Bernam, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.27, Syariah Judicial Department, RM48,724,619.00.

ChairmanEN

Schedule B.27, namely the sum of RM48,724,619.00 for Head B.27, Syariah Judicial Department, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.29, State Treasury (General Expenditure), RM197,910,046.00.

SpeakerEN

Schedule B.29, namely the sum of RM197,910.046.00 for Head B.29, State Treasury (General Expenditure), becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Schedule B.30, Selangor Syariah Prosecution Department, RM3,437,800.00.

SpeakerEN

Schedule B.30, namely the sum of RM3,437,800.00 for Head B.30, Selangor Syariah Prosecution Department, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Total Supply, RM3,111,767,000.00.

ChairmanEN

Total Supply, RM3,111,767,000.00, becomes part of the Schedule. Honourable Members who agree please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the HouseEN

Clause 1 and Clause 2.

ChairmanEN

Clause 1 and Clause 2 become part of the Bill. Honourable Members who agree please say Yes. Honourable Members who do not agree, please say No. Agreed.

Secretary of the House

Jadual.

ChairmanEN

The Schedule becomes part of the Bill. Honourable Members who agree please say yes. Honourable Members who do not agree please say no. Agreed. Proposer.

Dato' Seri Amirudin Bin ShariPKR · PHSungai TuaEN

Mr Chairman, I request to move that this Bill be reported to the House now.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Chairman, I second.

SpeakerEN

The House resumes.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Mr Speaker, I request to inform this House that this Bill has been considered in the Committee of Supply and has been agreed without any amendment. Therefore, I move that this Bill be read for the read for the third time and passed now.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Chairman, I second.

SpeakerEN

Honourable Members, the proposal before the House is that this Bill be read a third time and passed now. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Royal Allowances Amendment Bill 2025Bill

Secretary of the HouseEN

The third reading of this Bill may be titled Enakmen Pembekalan 2026. The next item on the Order of Business is the Royal Allowances (Amendment) Bill 2025.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Mr Speaker and Honourable Members, the Enakmen Peruntukan Diraja Pindaan 2025 needs to be amended under the allocations for Class 3 and the following class. For Class 3, the allocation has increased from RM7,966,734.00 to RM8,290,632.00, an increase of RM323,898.00. This increase is due to the calculation and adjustment of the emoluments of the Permanent Staff of the Palace Office. For the Class 4 portion, the allocation has increased from RM20,535,496.00 to RM24,055,598.00, an increase of RM3,520,102.00. This increase is needed for the replacement of equipment and the increase in emoluments of the Contract Staff of the Palace Office for the year 2025. Honourable Mr Speaker and Honourable Members of the House, with the explanation given just now, I hereby move that a Bill named Enakmen Diraja Pindaan 2025 be read a second time.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I second.

SpeakerEN

Honourable Members, this proposal has already been seconded. I now present this Bill for debate, if any. None. Honourable Members, I now invite the Government, if it wishes, to reply. There is no need for a reply since there is no debate. Therefore, Honourable Members, the proposal before the House is that this Bill be read a second time now. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Secretary of the HouseEN

The second reading of this Bill is titled Suatu Enakmen Untuk Meminda Enakmen Peruntukan Diraja 1959.

Speaker

Ya, pencadang.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Mr Speaker, I request to move that this House sit as a committee to deliberate on this matter clause by clause.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I second.

SpeakerEN

The House sits as a Committee.

Secretary of the House

Fasal 1.

ChairmanEN

Clause 1 becomes part of the Bill. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Secretary of the House

Fasal 2.

SpeakerEN

Clause 2 becomes part of the Bill. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed. Proposer.

Dato' Seri Amirudin Bin ShariPKR · PHSungai TuaEN

Mr Chairman, I request to move that this Bill, as has been discussed and agreed, be reported to the House for the third reading.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I second.

SpeakerEN

The House resumes.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Mr Speaker, I request to inform this House that this Bill has been considered in the Committee and has been agreed. Therefore, I move that this Bill be read a third time and passed now.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I second.

SpeakerEN

Honourable Members, the proposal before the House is that this Bill be read a third time and passed now. Honourable Members who agree please say Yes. Honourable Members who do not agree please say No. Agreed.

Motion Number 13 of 2025, Motion on Development Allocation 2026Motion

Secretary of the HouseEN

The third reading of this Bill may be named Enakmen Peruntukan Diraja Pindaan 2025. The next item on the Order of Business of the Meeting is Motion Number 13 of 2025, Development Allocation Motion 2026.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Mr Speaker and Honourable Members, I am happy to bring before this august House a motion that reads: pursuant to Section 9, Subsection 4(3) of the Akta Kumpulan Wang Pembangunan 1966, this House resolves that the allocation of the sum of RM1,370,000,000.00 stated in the development expenditure estimates tabled before this House under Section 4(1) of the same Act, as contained in the Schedule, be approved. P01 Office of the Menteri Besar and State Secretary RM1,043,600,000.00, State Treasury of Selangor P04 RM10,400,00.00, P08 Selangor State Agriculture Department RM9,500,000.00, P10 Selangor State Forestry Department RM5,000,000.00, P12 Selangor State Public Works Department RM130,000,000.00, Selangor State Irrigation and Drainage Department RM100,000,000.00, Selangor State Islamic Religious Department RM65,000,000.00, Selangor State Town and Rural Planning Department RM2,500,000.00, Selangor State Veterinary Services Department RM4,000,000.00, with the total amounting to RM1,370,000,000.00. A total of RM7 billion has been allocated as the ceiling for the Second Selangor Plan for 2026 to 2030. This total includes RM1.37 billion to finance the State Development Projects of Selangor for 2026. The allocation amounts by head are as in the Development Motion 2026. P01 Office of the Menteri Besar, a sum of RM1,043,600,000.00, has been allocated to the Office of the Menteri Besar and State Secretary, and the allocation according to the breakdown of PK is as follows. A sum of RM34,500,000.00 is allocated for sub-head 1 or PK1 Economy, which covers Expenditure on Research for Economic Development, Industrial and Investment Development, Smart Selangor Initiative and SME Development. PK2 Rural, an allocation totalling RM37,480,000.00 is provided for financing the Agriculture, Plantation and Agro-Based Industry Programme, Socio-Economic Development, Traditional Village Economic Development, Village Development, Public Facilities, Basic Village Amenities, Public Facilities Basic Village Amenities, Upgrading, Repair and Restoration of Rural Roads, and Development of New Villages. PK3 Entrepreneurs, an allocation totalling RM6,100,000.00 is provided for the Selangor Micro Entrepreneur Fund, Entrepreneur Promotion, Micro Entrepreneur Training, and the Establishment of the Selangor State Entrepreneur Corporation and Creative Economy. PK4 Social, totalling RM94,100,000.00, is provided for the purposes of Community Services, Development of Orang Asli Affairs, Human Capital Development Programme for Consumer Affairs, Culture Programme for Non-Islamic Affairs, Public Mindset Development Programme, Halal Industry, Disasters and Islamic Affairs. PK5 Education, a sum of RM94,700,000.00, is provided for the implementation of the Education Programme and Higher Education, School Assistance Project, Technical Skills Programme and Development of Indian Community Education. PK6 Women, Welfare and Health, a sum of RM154,470,000.00, is provided to cover expenditure on Women and Family Development, Community Welfare, Public Health Development and Unity. PK7 Youth and Sports, RM40,000,000.00, is provided for Youth Development Programmes, Sports Development and the Selangor State Football Development Programme. PK8 Caring Government, a total of RM5,000,000.00 is provided for the Caring Government Programme, Development of the Indian Community, Non-Governmental Organisation Assistance and Workers Empowerment. PK9 Treasury, a sum of RM30,520,000.00 is to cover the costs of Transport, Solid Waste Management and Local Government. PK10 Tourism, an allocation of RM8,000,000.00 to cover the costs of Tourism Promotion and Events. PK11 Information Technology and Innovation, a sum of RM16,662,500.00 is provided to implement ICT Development and Science, Technology and Innovation Projects. For PK12 Environment, a sum of RM7,666,000.00 is provided for the Green Technology Environment Programme and Restoration of Management Sites. PK17 Malay Customs and Heritage, a total of RM5,000,000.00 is provided for the Upgrading of Facilities at the Muzium Sultan Alam Shah, Upgrading of Anggerik Development, Use of District Museums, Research on Malay Customs, Language, Arts, Culture and Heritage, Upgrading of Historical Sites and Old Monuments, Purchase of Artifacts and Collections, Infrastructure Filling and Facilities of the Muzium Setem, and Development and Growth of Heritage. PK14 Libraries, a total of RM43,550,000.00 is provided for the Projek Ratu Fasa2B or Perpustakaan Raja Tun Uda Fasa 2B, New Construction of the Dataran Prima Ampang Branch Library, Upgrading of the Tanjung Karang Library, New Construction of Village Libraries, Upgrading of the Pekan Library, Upgrading of Branch Libraries, Upgrading of Village Libraries, Special Project of the Taman Seri Medan Kuala Langat Library, Joint Venture Project of the Agency, Project Equipment and Collections, Development of IP Infrastructure, Reading Promotion and Encouragement, Upgrading of District Libraries, Perpustakaan Daerah Kuala Selangor, and Rare Special Collections and Curatorial Work, RATU or Raja Tun Uda Fasa 2B. Housing and Urban Welfare, a sum of RM9,300,000.00 is provided to cover the costs of several identified projects. These include Repair Works for the Rakyat Housing Project, Community Urban Life and Sejahtera and Ceria Scheme, Caring In Government Residence Aid. PK16 Development of the Selangor Water Supply Project, a sum of RM4,500,000.00 is provided by the State Government. Among the main projects under this head are the Construction of the Labuhan Dagang Water Treatment Plant (LRA) or the Labuhan Dagang – Kuala Langat Water Treatment Plant, and the Raw Water Guarantee Scheme (SJAM). PK17 Special State Projects, totalling RM32,700,000.00, is provided to cover the costs of several identified projects, including the construction of the Muzium Setem, Muzium Tekstil, Development of the Historical Zone and the Flood Mitigation Project (SMG). PK18 Selangor Caring Programme Iltizam, totalling RM113,600,000.00, is provided for the Women's Health Scheme, Nursery Child Allowance, National Awareness, Higher Education Institution Scholarship Award Programme, TUNAS Scheme of the Selangor Children's Heritage Fund, Golden Age Friendly Scheme, Free Water Provision Programme and also the ILTIZAM Anak Selangor Programme. PK19 General, a sum of RM350,751,500.00 is provided for the Government Building Repair Project, Land Reacquisition and various other projects. Honourable Mr Speaker and Honourable Members, next is the development allocation.

SpeakerEN

Honourable Members, as the time has reached 1.02 p.m., I hereby adjourn the sitting of the House until 2.30 p.m. this afternoon. The House is adjourned.

(THE HOUSE ADJOURNED AT 1.00 P.M.)

(THE HOUSE RESUMED) (DEPUTY SPEAKER IN THE CHAIR)

Deputy SpeakerEN

Bismillahirrahmanirrahim, Assalamualaikum WBT. Greetings of peace, good afternoon to all Members of the Selangor State Legislative Assembly. The Selangor State Legislative Assembly also welcomes the following visitors to the Selangor State Legislative Assembly sitting from the Asia Excellence Entrepreneur Federation (AEEF), 19 persons led by Prof. Dr. Robin Tan, arranged by Dr. Joness, and the Impian Wanita Berdaya Selangor Association, 4 persons led by Siti Nur Aishah binti Mohd Zain, arranged by the Office of EXCO YB Anfaal. Now the House invites Dato’ Menteri Besar to continue today's programme, today's order of business.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Deputy Speaker. I continue to P.K 17 - State Special Project, amounting to RM32,700,000.00 (Thirty-Two Million Seven Hundred Thousand) allocated to cover the cost of several identified projects. These include the construction of the Stamp Museum, the Textile Museum, the development of the historic zone and flood mitigation projects (SMG).

For P.K 18 – Selangor Caring Commitment Programme (Program Iltizam Selangor Penyayang), amounting to RM113,600,000.00 (One Hundred Thirteen Million Six Hundred Thousand) is allocated for the Women's Health Scheme, the Child Allowance for Nursery (Asuh Pintar), National Consciousness Awareness, the Higher Education Institution (IPT) Study Grant Programme, Skim Tunas, the Selangor Children's Heritage Fund (TAWAS), the Golden Age Friendly Scheme (SMUE), the Free Water Provision Programme and the Selangor Child Commitment Programme.

For P.K 19 - General, amounting to RM305,751,500.00 (Three Hundred Five Million Seven Hundred Fifty-One Thousand Five Hundred) is allocated for the refurbishment of government buildings, land acquisition and various other projects.

Honourable Mr Speaker and all Honourable Members. Next, the development allocations for:

P.04 - Selangor State Treasury (Perbendaharaan Negeri Selangor), a total of RM10,400,000.00 (Ten Million Four Hundred Thousand) has been allocated to P.04 – Selangor State Treasury under P.K 1 - ICT Development, namely for the development of the Selangor Smart Procurement and Asset Management System (IPRAISE) for the PPA Division, the replacement of iSPEKS hardware at the Selangor State Treasury's data centre (DC) and disaster recovery centre (DRC), as well as the development and certification of the Selangor State Treasury's Information Security Management System (ISMS) (Phase 1).

P.08 - Selangor State Agriculture Department (Jabatan Pertanian Negeri Selangor), a total of RM9,500,000.00 (Nine Million Five Hundred Thousand) has been allocated to P.08 - Selangor State Agriculture Department. Of this total, RM1,480,000.00 (One Million Four Hundred Eighty Thousand) has been allocated to P.K 1 - Smart Agricultural Technology and Infrastructure Development Programme for IoT and AI purposes, mechanisation and automation, as well as Smart Fertigation System infrastructure.

For P.K 15 – Crop Productivity Enhancement Programme, amounting to RM3,370,000.00 (Three Million Three Hundred Seventy Thousand) has been allocated for the programme on fruit crops, vegetables, annual crops, mushrooms, herbs and spices, paddy, and coconut.

P.K 16 – Strategic Partnership and Capacity Building Development Programme, a total of RM1,500,000.00 (One Million Five Hundred Thousand) is allocated to finance capacity building and technology transformation development, participatory observation and technology promotion programmes, innovation culture and commercialisation programmes, and strategic partner collaboration programmes.

P.K 17 – Agro-Based Primary Industry and Agro-Tourism Development Programme, amounting to RM1,100,000.00 (One Million One Hundred Thousand).

P.K 18 – Safe and Quality Food Production Programme, a total of RM500,000.00 (Five Hundred Thousand).

P.K 19 – Agro Food Park (AFP) and Potential Land Development Programme, amounting to RM1,050,000.00 (One Million Fifty Thousand).

And P.K 20 – Seed Grower and Nursery Development Programme, amounting to RM500,000.00 (Five Hundred Thousand).

P.10 – Selangor State Forestry Department (Jabatan Perhutanan Negeri Selangor), a total of RM5,000,000.00 (Five Million) has been allocated to P.10 - Selangor State Forestry Department and is distributed as follows. P.K 1 – Forest Resource Management Programme, RM450,000.00.

P.K 2 - Forest Resource Development Programme, amounting to RM400,000.00 (Four Hundred Thousand).

P.K 3 - Forest Protection and Innovation Programme, amounting to RM450,000.00 (Four Hundred Fifty Thousand).

P.K 4 – Social Forestry Programme, amounting to RM500,000.00 (Five Hundred Thousand).

P.K 5 - Forest Development and Engineering Programme, amounting to RM1,300,000.00 (One Million Three Hundred Thousand) allocated for infrastructure and development, development of the Sungai Buloh forestry complex and forest road connectivity.

P.K 6 - Forest Enforcement Programme, amounting to half a million or RM500,000.00 (Five Hundred Thousand).

P.K 7 - Forest Utilisation Programme, amounting to RM350,000.00 (Three Hundred Fifty Thousand) has been allocated for the development and consolidation of the e-quarry system as well as forest and timber-based industry licences and permits.

P.K 8 - Forest Plantation Development Programme, amounting to RM50,000.00 (Fifty Thousand) has been allocated for the management and development of forest plantations.

P.K 9 - Selangor Royal Heritage Forest Management and Development Programme, amounting to RM1,000,000.00 (One Million) allocated for the development and management of non-timber forest resources (rock materials) in the Selangor permanent forest reserves.

Honourable Deputy Speaker and all Honourable Members.

P.12 - Selangor State Public Works Department (JKR) (Jabatan Kerja Raya Negeri Selangor), a total of RM130,000,000.00 (One Hundred Thirty Million) has been allocated to P.12 - Selangor State Public Works Department (JKR). Of this total, RM18,749,390.00 (Eighteen Million Seven Hundred Forty-Nine Thousand Three Hundred Ninety) has been allocated to P.K 1 - Various Road Development Programme Plans, for the purposes of rehabilitating slopes, land acquisition, upgrading roads, road shoulders and junctions throughout Selangor, initial works, gazettement of state roads, the strategic road and highway plan for Selangor, installing street lights and traffic lights, enhancing road safety aspects, and upgrading culverts and roadside drainage throughout Selangor.

P.K 2 - Construction of Bridges & Footbridges, amounting to RM5,000,090.00 (Five Million Ninety) allocated for the construction and upgrading of bridges and footbridges identified by district in the State of Selangor.

P.K 3 - Road Construction, amounting to RM24,900,060.00 (Twenty-Four Million Nine Hundred Thousand Sixty) allocated for the construction of new roads throughout the State of Selangor according to priority and actual need.

P.K 4 - Road Upgrading, amounting to RM74,350,440.00 (Seventy-Four Million Three Hundred Fifty Thousand Four Hundred Forty) allocated for upgrading roads throughout Selangor by district.

P.K 5 - Building Construction and Upgrading Projects, amounting to RM7,000,020.00 (Seven Million Twenty) allocated for the refurbishment of palaces throughout the State of Selangor, the construction of the Petaling district JKR office, the integrated development of the workshop and related facilities for JKR Klang, the construction of the Sabak Bernam district JKR office, as well as various building projects.

P.13 – Selangor State Irrigation and Drainage Department (Jabatan Pengairan Dan Saliran Negeri Selangor), a total of RM100,000,000.00 (One Hundred Million) has been allocated to P.13 - Selangor State Irrigation and Drainage Department, with RM54,346,600.00 (Fifty-Four Million Three Hundred Forty-Six Thousand Six Hundred) allocated to P.K 1 - Flood Mitigation Project Development to carry out design studies, surveys, soil investigations, gazettement and land acquisition, as well as flood mitigation projects in river basins throughout the State of Selangor.

P.K 2 – Drainage System Development, amounting to RM12,890,120.00 (Twelve Million Eight Hundred Ninety Thousand One Hundred Twenty) allocated for the programme to construct and upgrade drainage throughout Selangor, as well as the retrofitting of the drainage system in the Hulu Langat district.

P.K 3 - River Basin Development, amounting to RM11,513,120.00 (Eleven Million Five Hundred Thirteen Thousand One Hundred Twenty) allocated for projects to stabilise and strengthen riverbanks, construct dams and embankments, and upgrade silt traps/log booms in various districts.

P.K 4 - Water Resources and Hydrology Development, amounting to RM1,000,010.00 (One Million Ten) allocated for the development of stations together with flood forecasting and warning systems.

P.K 5 - Environmentally Friendly Drainage Management, amounting to RM8,650,030.00 (Eight Million Six Hundred Fifty Thousand Thirty) allocated to construct and upgrade retention ponds, the Environmentally Friendly Drainage Master Plan (PISMA) in various districts, as well as erosion, sediment and water quality control in various districts.

P.K 6 - Coastal Development, amounting to RM4,000,120.00 (Four Million One Hundred Twenty) allocated to strengthen coastal defences, conservation and preservation plans for beaches and estuaries, and studies on the effectiveness of coastal defences.

P.K 7 - Mechanical and Electrical Infrastructure Development, amounting to RM2,400,000.00 (Two Million Four Hundred Thousand) allocated for the programme to modernise and upgrade the hydromechanical sluice gate control system and upgrade the capacity of mobile pumps in various districts.

P.K 8 - Building Infrastructure Development, amounting to RM2,600,000.00 (Two Million Six Hundred Thousand) allocated to construct and complete six (6) new sluice gate quarters units, replace two (2) existing quarters units in the Klang district, construct and complete an office complex for the Sabak Bernam district Irrigation and Drainage Department, and upgrade quarters in various districts.

P.K 9 - Departmental ICT Development, amounting to RM600,000.00 (Six Hundred Thousand).

P.K 10 - Miscellaneous, amounting to RM2,000,000.00 (Two Million) allocated for unforeseen emergency works of the Irrigation and Drainage Department.

P.14 – Selangor Islamic Religious Department (Jabatan Agama Islam Selangor), RM65,000,000.00 (Sixty-Five Million) has been allocated to P.14 - Selangor Islamic Religious Department. Of this total, RM21,100,000.00 (Twenty-One Million One Hundred Thousand) has been allocated to P.K 1 - Religious Schools, for the purpose of refurbishing religious schools and the Science Integrated Tahfiz Institute (Maahad Integrasi Tahfiz Sains) in every district in the State of Selangor.

P.K 2 - Islamic Religious Offices, amounting to RM6,000,000.00 (Six Million) allocated for the refurbishment and upgrading of the District Islamic Religious Office buildings, the Selangor Islamic Complex and the Selangor Dakwah Training Institute (ILDAS).

P.K 3 - Mosques, amounting to RM34,400,000.00 (Thirty-Four Million Four Hundred Thousand) allocated for the construction, refurbishment and upgrading of mosques throughout Selangor.

P.K 4 - Surau, amounting to RM500,000.00 (Five Hundred Thousand) allocated for refurbishment and upgrading works on surau.

Meanwhile, P.K 5 - Miscellaneous, amounting to RM3,000,000.00 (Three Million) allocated for upgrading quarters and various development projects.

P.16 – Selangor State Town and Rural Planning Department (Jabatan Perancangan Bandar Dan Desa Negeri Selangor), amounting to RM2,500,000.00 (Two Million Five Hundred Thousand) has been allocated to P.16 - Selangor State Town and Rural Planning Department. Of this total, RM700,000.00 (Seven Hundred Thousand) has been allocated to P.K 1 - Development Plan for the State Structure Plan, Local Plan (RT) and Special Area Plan (RKK) programmes.

P.K 2 - Policy Planning, amounting to RM500,000.00 (Five Hundred Thousand).

P.K 3 - Special Studies, amounting to RM1,100,000.00 (One Million One Hundred Thousand) allocated to cover the cost of special studies to be carried out by the State Town and Rural Planning Department and the 4th Tier Planning Special Action Plan (PTK).

Meanwhile, P.K 4 - Selangor State Geospatial Information Centre, amounting to RM200,000.00 (Two Hundred Thousand) allocated for the Development Plan Monitoring System.

P.17 – Selangor State Veterinary Services Department (Jabatan Perkhidmatan Veterinar Negeri Selangor), a total of RM4,000,000.00 (Four Million) has been allocated to P.17 - Selangor State Veterinary Services Department. Of this total, RM600,000.00 (Six Hundred Thousand) has been allocated to P.K 1 - Ruminant Livestock Commodity Development, namely for the Selangor Ruminant Modernisation Programme and the Selangor Ruminant Nutrition Programme.

P.K 2 - Poultry/Non-Ruminant Livestock Commodity Development, amounting to RM300,000.00 (Three Hundred Thousand).

For P.K 3 - Livestock-Based Downstream Industry Development, amounting to RM150,000.00 (One Hundred Fifty Thousand).

P.K 4 - Veterinary Health, amounting to RM480,000.00 (Four Hundred Eighty Thousand).

P.K 5 - Regulatory, amounting to RM100,000.00 (One Hundred Thousand) allocated for strengthening the enactments and acts under the State Veterinary Services Department.

P.K 6 - Agropreneur Competency Development and Guidance, amounting to RM250,000.00 (Two Hundred Fifty Thousand).

Under P.K 7 - Enhancement of Veterinary Service Quality, amounting to RM350,000.00 (Three Hundred Fifty Thousand)..

For P.K 8 - Development of the Permanent Food Production Park (TKPM), amounting to RM850,000.00 (Eight Hundred Fifty Thousand).

P.K 9 - Ruminant Livestock Breeding Genetics Development, amounting to RM350,000.00 (Three Hundred Fifty Thousand).

P.K 10 - Development of the Sg. Nilam Veterinary Technical Training Centre, amounting to RM420,000.00 (Four Hundred Twenty Thousand).

P.K 11 – Veterinary Information Technology System Development, amounting to RM150,000.00 (One Hundred Fifty Thousand).

Mr Speaker, I and Honourable Members, I therefore respectfully move the allocation for the Selangor State Development Motion 2026.

Deputy SpeakerEN

Is there anyone who supports?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I support.

Deputy SpeakerEN

Honourable Members, the matter before this House is a motion that has been moved by YAB Dato' Menteri Besar, namely the Development Allocation Motion 2026. I therefore put forward this motion for debate.

Deputy SpeakerEN

Subang Jaya? The Honourable Member for Subang Jaya?

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Mr Deputy Speaker, thank you for giving Subang Jaya the opportunity to debate the Development Budget. Subang Jaya only wishes to raise 3 matters. Subang Jaya would like to refer to Vote 1 P01 – Office of the Menteri Besar and State Secretary. On page 188 P.K6 – Women, Welfare and Health. Item 06001 Women and Family Development. Subang Jaya wishes to raise this matter as Chairman of the Special Committee on Improving Care Services, where we are drafting a set of guidelines on care centres and also nurseries. I would like to refer to an article that appeared in The Star recently, on 18 November 2025, with permission Mr Deputy Speaker, titled: Child Care Centres Closing In KL, Putrajaya and Perak Despite Rising Demand.

This is a report from DOSM which shows that although demand is rising among the public, especially in urban areas, we see that there are many care centres that have closed. With the permission of Mr Speaker, I would like to read a short excerpt from this article. Figures from the Department of Statistics Malaysia show an 11% drop in Kuala Lumpur in 2024 compared to the year before, from 218 to 193. Putrajaya and Perak both declined by 21%, with Putrajaya falling from 62 to 49, while Perak dropped from 245 to 194. Norsheila, who is a operator of taska and tadika, said as follows: Norsheila said that strict licensing and safety regulations under the Social Welfare Department (JKM) are important, but noted that smaller centers are struggling with the administrative burden and cost of compliance. Furthermore, she also said that Nor Sheila call for stronger collaboration between state, that is us, and federal governments to encourage of setting up the community base about child care centers supported by tax freely rental subsidies and use of under utilize publics buldings.

So from here we see that if, as a State Government, we set the threshold for registering as a care centre too high, then it has a direct impact on the social situation in this state. I also stand here as a mother who will be welcoming my second child in January, and I am worried about this situation, because it shows that there are many working families like me who need social support, which one day may not be able to find such support. So within the framework of the guidelines, JKPPP has seen how, especially at the level of the local authority, we can review several procedures so that we can ease the affairs of operators, and I would like to refer to a guide issued by the Selangor State Planning Department on the implementation of planning permission for material changes in the use of land and buildings under the Town and Country Planning Act 1976. Indeed, the effort to produce these guidelines is very good because we want to ensure that at the local authority level all our affairs are the same, from Sabak Bernam to Shah Alam to Subang Jaya and so on. However, I want to refer to page 25, which concerns the preparation of a development proposal report and the requirement to refer to the OSC, or One Stop Center, and also the equivalent plan. Especially for Senior Citizen Care Centres, Tadika, Taska and Care Centres, where in this guide it states that for the development proposal report and also for the equivalent plan, they must be prepared by a registered town planner and also a registered architect or plan draughtsman, and then all these processes must go through the OSC, or One Stop Center.

Indeed, for other applications they will not face challenges like Tadika, Taska and these Care Centres, because for this category of application they must obtain approval from the Department of Social Welfare and the Department of Health, both of which are not within the OSC. So what this means is that if they are not within the OSC, the OSC 3.0 system cannot help them obtain comments from those agencies. What this means at the grassroots is that what they have to do is go and knock on every door: knock on the door of the Department of Social Welfare to ask for their comments, knock on the door of the Department of Health to ask for their comments, then manually upload to the OSC system for consideration.

With permission Mr Deputy Speaker, a system like this does not make things easier at all for the operators who are now already facing the problems highlighted in this Star article. So what we propose at the JKPPP level is as follows: indeed, for some applications of this kind, which no longer go through the OSC, they go through a special committee consisting of internal agencies and also external agencies so that we are more specific to each application, for example Subang Jaya, for example Petaling Jaya, which in my view I see as a matter that already exists as, with respective permission, something that we should apply in other councils. Furthermore, for Development Proposal Reports and also Equivalent Plans, many councils have actually only helped operators at the grassroots, where they have prepared a template Development Proposal Report for operators to fill in, and have also prepared an Equivalent Plan book that can be purchased, and amendments can then be made and endorsed by the local authority, and this method is very, very cost-saving. This is the main problem for operators if we as the Government still require them to go through the process of appointing a registered town planner or architect. Those who have dealt or who have ever dealt with town planners or architects know that for each of these professionals, if you want to hire them, it will cost at least 10,000.00 ringgit, Mr Deputy Speaker, and for Taska and Tadika operators whose margins are not very big, how can we ask them to go through that process? So I hope that JKPPP will then bring a paper for consideration so that this matter can be reviewed, so that we can make site conditions easier and then tackle the problems that are now being faced in Kuala Lumpur, Putrajaya and Perak, so that they will not happen in the State of Selangor.

Mr Deputy Speaker, Subang Jaya would like to move on to the second matter, which I wish to refer to in Vote P01 – Office of the Menteri Besar and State Secretary on page 190 PK14 – Library, item 14009 Build New Village Library. Mr Deputy Speaker, last year Subang Jaya identified a plot of land in USJ 1, which was originally earmarked for a health clinic, but when the previous ADUN consulted with the Department of Health or the Ministry of Health, they found that the land was too small and a health clinic could not be built to the existing specifications. So with the existence of the Health Clinic in Subang Jaya that is being built, this land is no longer needed, and we have indeed obtained confirmation from the Ministry of Health that this land is no longer required. So Subang Jaya proposes that this land be changed in use for a Library, and here I would like to express a thousand thanks to PPAS, which has greatly helped to assess the suitability of this land and, in addition, has submitted an application to gazette this land as library land. I understand that the gazetting process has reached its final stage, and I hope that this year we can gazette the land. Subang Jaya would like to ask whether, under item 14009 in the effort to build a new Village Library, there is any opportunity for Subang Jaya to get this library built in the USJ 1 area next year.

Mr Speaker, next, the third and final matter for me, I would like to refer to Vote P01 – Office of the Menteri Besar and State Secretary, page 191 PK15 – Housing and Urban Welfare. Item 15062 – Community Well-being Urban Living. Subang Jaya specifically wishes to refer to the Strata assistance fund. For the information of the Honourable Members and this august House, Subang Jaya has the largest number of strata units in the Selangor Government, and some of them were built 20 to 30 years ago. One of them is, sorry, a mistake, it is Spektrum Apartment and also Indah Court Apartment, which existed before the Subang Jaya Municipal Council was established. It existed when it was MPPJ (Petaling Jaya Municipal Council), so this development is more than 30 years old and until now has not yet obtained strata title. Indeed, for developments like this, the developer or landowner has already closed down, so now it must be pursued by the residents themselves, and the money that was previously paid to the developer for this purpose cannot now be collected, because they no longer exist, since the funds need to be collected again, and this is a very heavy burden for the buyers. So especially for Indah Court Apartment, they are already at the final stage of the application, thankfully for Indah Court they have been able to find the building plans, so they only need to make the application, submission and payment and so on. So I hope Indah Court Apartment can be given priority for the Strata assistance fund, while Spektrum Apartment has only just submitted its application, and for this case it may be a little complex, but I also hope that next year these apartments can be considered so that the problem that has existed for 30 years, who knows how long, can be solved through this Strata assistance fund. With that, Mr Speaker, Mr Deputy Speaker, Subang Jaya supports the motion.

Deputy SpeakerEN

Thank you, Subang Jaya. The Honourable Member for Meru.

Thank you Mr Deputy Speaker, Meru would like to refer to Vote P01 - Office of the Menteri Besar, PK 4 Social 040007 Non-Muslim Affairs. Because the Kapar area has experienced a sudden population increase, and a large part of it is from the Indian community, this population increase is due either to rapid housing development or migration from outside the area. For example in Kapar, the composition of the Indian community in Kapar has become so sudden and noticeable, and it is the second largest in the Meru area, whereas there is no cemetery provided for Hindus in Kapar, so in terms of burial they have to go to Klang, which is quite far from the Kapar area, and it is understood that there is a site that has been gazetted as a burial ground for Hindus. So I hope the Government can give attention to this issue, to this issue, and can resolve this issue as soon as possible. So I would like to ask whether, within the RM8.5 million allocation for Non-Muslim Affairs, the development of this Hindu cemetery or this crematorium is included in the allocation or not, or whether it is included for the development of this Hindu community cemetery.

Secondly, I would like to refer to Vote P14 – Selangor Islamic Religious Department, PK 4 – Repair and Upgrading of Surau, an allocation of RM500,000.00, so under Vote 04100

Given the quite large number of surau, I am confident this is not only in Meru but throughout Selangor, and most of the development of these surau comes from the contributions of many parties or from the efforts of the residents themselves, and what we see is that many surau are also in a dilapidated and old condition, and they also have plans to extend the surau given the population increase. So I propose that consideration be given to increasing the allocation for the improvement and upgrading of these surau from 500,000 to a more reasonable amount. I would also like to refer to PK18 – IPT Study Gift under Code 05002. The Meru State Assembly Community Service Centre has been visited or often receives applications for financial contributions from parents of children or students who are about to register to enter IPT. They need early expenses for tuition fees and so on, and at least this contribution can ease their burden, but we have never rejected these applications, the Service Centre or whichever ADN has never rejected these applications, we have contributed to them even if only a little. Although we already have the initiative or Iltizam IPT Entry Gift under the government, we see that there are many processes that applicants must go through, where they must apply online, and they do not receive this financial contribution, this IPT gift, before they enter or register at the university. Usually they will receive it afterwards, or perhaps within one or two months. So, I propose and hope that the system of giving IPT entry gifts be improved, so that it can be given earlier, before these students register to enter IPT.

One more matter, which is under PK14 - 14010, also related to the development of urban libraries. I do not know whether Meru is a town or a village. In Meru there is a library that is housed in a building owned by the Klang Royal City Council. In my view its condition is very dilapidated, cramped, only a room with an area of approximately 20x20 square feet. Yet its use and visitors are very high, especially among primary school students, who seem to make the library a temporary transit centre, those dropped off by parents before they go to the afternoon session religious school or the morning session religious school, go to the afternoon session national school. So, I hope the process of building a comfortable library for the people of Meru, especially students, can be expedited, and I have been informed by PPAS that PPAS has applied for a plot of land, which has been identified in the town of Meru and is awaiting the approval process, and I hope the approval of this application can be expedited for the construction of a new library building, which is more comfortable for the residents and community of Meru. Thank you.

Deputy Speaker

Seri Serdang.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Thank you, Mr Deputy Speaker. Assalamualaikum. Seri Serdang wishes to highlight only a few matters. First, regarding PK2 Luar Bandar, where there are several allocations here that I think are very good for our rural applications. Only, Seri Serdang's view is that more attention should be given to rural areas, especially traditional villages, not merely to programmes, IKS applications and so on, but also to infrastructure. If we look at these village areas, this is where there are many rubbish heaps or refuse collection points that need to be managed. Perhaps under the EXCO's portfolio, this matter can be looked at seriously and discussions held with the PBT so that it can be resolved properly, because these villagers do not have rubbish bins at their own homes. Most of them concentrate their waste in one place. So I think attention can be given to the level of cleanliness in village areas, especially traditional villages in our state of Selangor.

Secondly, regarding prizes for our children who enter IPT. In my previous debate, I put forward a proposal other than cash prizes. What helps our children to university today, and what they urgently need, is a laptop or notebook computer. I think the State Government may give attention to finding a way for us to help our children, our younger siblings who go on to IPT, whether IPTA or IPTS and so on, to obtain laptop assistance, which is very much needed, and laptop prices are not cheap nowadays. I recall that it is RM1,500 and above, depending on the specifications. But even the basic model costs more than RM1,500 before one can get one. So, an amount of RM1,500 is quite a large sum for our children, especially children who have great potential but come from B40 families. So, I think the Selangor State Government can give attention to looking at this issue more carefully.

Next, I would like to turn to Vote P13, the Selangor State Irrigation and Drainage Department (JPS). Under code PK2-02104, upgrading drainage in the traditional village of Puchong Kampung Baru. Looking at this amount, in last year's budget session for 2025, the same amount was already in the budget presentation for 2025. I would like certainty from the Honourable State Government: is this amount the same, is this project still continuing, is this project still ongoing, or is there an addition of another RM15 million to the drainage project in the traditional village of Kampung Sungai Baru? And if we still remember, this is the village where the Putra Height gas pipe explosion disaster occurred, and it is also here that flooding frequently happens, including this morning. It flooded this morning too. I think the government needs to explain whether this amount is the same as last year, meaning an on-going project, or an addition to a new project in Kampung Kuala Sungai Baru?

The second is 02105, upgrading the drainage system in the Seri Serdang area. I understand there is a plan for the Sungai Kuyoh RTB (Flood Mitigation Plan) that involves this Seri Serdang area. Is this amount, also quite large at RM15 million, for the same RTB, or perhaps an extension of that RTB itself, or another area allocated with, with permission, this RM15 million, so that we can have certainty? Because in the Seri Serdang area, the Sungai Kuyoh RTB has a fairly large allocation from the Federal Government. I want certainty from the State Government as to whether this addition is from that RTB, from another project, or from a new project identified by JPS?

Next, I turn to Vote P14, the Selangor Islamic Religious Department (JAIS). On this one, I think the Honourable EXCO has already smiled and laughed. In the early budgets, the first year, second year and third year, this item has always been there. I highlight 01303, SRA Puchong Utama. I want to know from the Selangor State Government whether this allocation is being used or not, and what the reason is for us not using this allocation. I am informed that from RMK12 and now RMK13, so I think in a dense area like Seri Serdang, there is certainly a need for more schools, and the construction of SRA Puchong Utama would be a great help to residents and our children to study in Puchong Utama in particular and the Seri Serdang state constituency area. I request the attention of the Honourable State Government, especially the Honourable EXCO, to give an explanation, because for three budget presentations the item has remained here, and there is still RM10 under the RMK13 item.

And finally, also under Vote P14, Selangor Islamic Religious Department, 03111, Masjid Taman Lestari Putera Puchong. This is also the same. For three budget presentations, the same item has been here, but there is an increase, in that it has put RM1 million in RMK13 compared with the previous RM10, but now it has increased by RM1 million. I want certainty on when this mosque can be realised? For the information of the State Government and the Honourable EXCO, this area has no mosque. There are only surau that have been upgraded for Friday prayers. The area is very dense, and I hope the construction of this mosque can be expedited, because we have a problem building a mosque if there is no money. Now the money is already there, RM20 million. I think it needs to be managed well so that it can be carried out quickly, because for three budget presentations it has remained here, with only an increase of RM1 million from RM10. So I hope the Honourable EXCO will also give attention, and the Selangor State Government should give attention. Honourable EXCO, I am not joking, this is serious. You are welcome to come to this area yourself and see for yourself the residents here, who perform Friday prayers at several surau that have been upgraded, and who badly need a mosque. Not a single mosque has been built in this area all this time. So I hope for attention from the State Government, especially the Honourable EXCO, to look at this issue properly. Thank you, Assalamualaikum.

Deputy SpeakerEN

Thank you. The Honourable Member for Ijok.

Tuan Jefri Bin MejanPAS · PNIjokEN

Thank you to Mr Speaker. Ijok wishes to take several parts regarding expenditure. The first is the Vote for P01, Office of the Menteri Besar and State Secretary, referring to 02006 PK2 Luar Bandar. Regarding upgrading and rehabilitation of rural roads, page 187. Mr Speaker, Ijok wishes to request consideration for rehabilitating Jalan Orked at Batu 7, Kampung Ijok and Lorong Ros, and several lanes involved, because only this road is rather problematic, which has not been resurfaced and rehabilitated. And Ijok wishes to ask whether the State Government is still approving applications regarding access roads (jalan izin lalu). If so, Ijok wishes to forward several applications from land parcels applying for access rights. Firstly, Lot PT44704 Jalan Pakat 1, Bukit Badong. Secondly, Lot 451 Jalan Makmur Kampung Ijok. Thirdly, Lot 2750 Batu 4, Ijok. Fourthly, Lot 1413 Jalan Orked Batu 7, Ijok.

Next, Mr Speaker, Ijok turns to PK5 on page 188, 05004, regarding the Technical Skills Programme, for the State Government to provide a special allocation to cover assessment fees and preparatory training for SKM PPT Amali, to open opportunities for skilled workers with skills to obtain, to have their certificates verified through formal learning.

Next, Mr Speaker, still under Vote P01, namely PK12, regarding the environment, page 189. Ijok wishes to ask about Code 12003, Rehabilitation of Disposal Sites. Can this allocation be used for rehabilitating sites or illegal rubbish dumping places? For example, what happened in Ijok, where along or in the river basins, Sungai Buloh has become an illegal rubbish dumping site. Can this allocation be used for rehabilitation as a disposal site, because today along Sungai Buloh is full of water and is carrying rubbish to Ijok in flood conditions this morning.

Mr Speaker, next Ijok wishes to turn to Vote P12, the Selangor State Public Works Department (JKR). Mr Speaker, referring to project code 01010, namely upgrading sewerage and drainage along roadsides throughout Selangor. Ijok requests that JKR and JPS discuss the flooding problem that frequently occurs at SK Kebangsaan Ijok. In front here, whenever there is heavy rain, the Tabika Kemas and Pra areas and the Ijok school field are inundated. This is caused by the FT54 road having drainage from JKR and a drain under JPS supervision. So Ijok requests consideration from JPS and JKR to resolve the recurring flooding at SK Ijok.

Next, on sewerage as well, Ijok wishes to request JKR to study the height of the bridge at the BHP Bestari Jaya petrol station, namely Jalan Rawang B27, to enlarge the sewer, to allow water from Parit 6 to flow away, which causes flooding at Taman Suria, Kampung Jaya Setia and surrounding areas.

Ijok next concerns Project Code PK4 04700 Kuala Selangor, for Code 04709, for Works to Upgrade Jalan Parit Mahang B109, Kuala Selangor District. For the information of Mr Speaker, when flooding occurs on this road, the road will be closed. And I also thank the State Government because this project has been included in the list of projects under PK4. But I request that consideration also be given to the fact that along this road there are three culverts that need to be looked at for upgrading too. Not only the road should be upgraded, but the culverts located on Jalan Parit Mahang should also be upgraded. And there are two drains on either side that are not maintained, namely the right side has never been maintained because it has no owner, and the left side, Alhamdulillah, is maintained by JPS.

Next, Mr Speaker, Ijok also hopes that the other day, thanks to the EXCO for Infrastructure, who mentioned the project to be carried out or rehabilitated at Jalan Merbau Bukit Cerakah. So, Ijok really hopes this road can be considered because this road is an important access route for residents of Kampung Bukit Cerakah, Parit Mahang, Bukit Kucing and Bukit Hijau. Only, Mr Speaker, Ijok is always concerned that this road, and perhaps other roads elsewhere too, after excavation or drain desilting work, landslides will occur.

So I hope there will be discussions with JPS or JKR on how to prevent landslides from occurring after this cleaning work. It can be said that around Ijok now there are very many landslides after excavation, perhaps caused by vibrations from the earlier excavation process. So perhaps there are ways or various methods that can be considered to prevent these landslides from happening.

Finally, Mr Speaker, regarding Vote P-13, the Irrigation and Drainage Department, regarding the Development of PK-1: Flood Mitigation Projects, namely Project Code 01100, Ijok wishes to ask about the status of the Drainage System Upgrading Project at Kampung Jaya Setia, Mukim Ijok, which, for the information of Mr Speaker and this August House, today already has 22 residents evacuated to the PPS at Kampung Jaya Setia. So therefore, Ijok requests an explanation regarding the status of the Drainage System Upgrading Project at Kampung Jaya Setia.

And finally, Mr Speaker, regarding PK-5, Environmentally Friendly Drainage Management, namely 05100, Construction and Upgrading of Retention Ponds. Mr Speaker, at Kampung Harmoni there is anxiety whenever heavy rain falls, from water released from the retention ponds of Kota Puteri. For the information of this August House, this drain has a boundary between JPS Gombak District and JPS Kuala Selangor District. Kota Puteri is in Gombak District, because the drain that is released is the JPS Kuala Selangor drain. So I really, really hope that the parties involved, whether JPS Gombak, JPS Kuala Selangor Ijok, and PKNS, can control the release of water from these retention ponds, which causes the water to enter Kampung Harmoni and go straight to Kampung Ijok. So Ijok really hopes that every debating season Ijok will bring up the same matter, because if you want to see, to come along, do not come down when it is not raining. Ijok really hopes that JPS and any party willing to come down during rain with me, I am ready to go down together during heavy rain and when water is rushing out of the retention pond. Thank you.

The Honourable Member for Batu Tiga.

Deputy SpeakerEN

Kota Damansara first or Batu Tiga first?

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Batu Tiga has sat down again. Okay, thank you to the Deputy Speaker for allowing Kota Damansara to debate under Development. Kota Damansara has only 5 issues.

Firstly, under Vote P01, on page 187, PK2 Code 02006. If we look here, it is Rural Development. Here it is Infra and Repair of Rural Roads. The allocation provided is RM1 million. For the information of the State Government. I understand that sometimes most urban infrastructure funds are channelled by the Ministry of Rural and Regional Development (KKDW). But nevertheless, I think this RM1 million allocation is far too small. Because if this year, 2025, only two roads from Kota Damansara were received in the Kampung Melayu Subang area. If it is to be retained, this allocation should be given more to Kota Damansara. I have no problem with keeping this large allocation. Instead, 2 should be increased to 4 or 5 roads.

The second issue is also under P01, on page 190, which is Code 14009. This concerns building new village libraries. Kota Damansara has built one village library, which I consider to be of very good standard. It is not just an ordinary library, but it also serves as a transit centre for children outside. Kota Damansara is not asking for another one for the Kota Damansara area because there is already one. What Kota Damansara is asking is for the Government to increase libraries like the one in Kota Damansara in the other State Assembly seats (DUN) that have many B40 areas. Where the children from these B40 families do not only study but also use it as a transit centre. Because we want these libraries to be not only for people to read books, borrow books and so on. But also to be a centre of knowledge, a community centre and a social centre for children. Because we can reduce cases of social problems occurring outside, especially among Selangor's children.

Next, Honourable Deputy Speaker, for P10, if we look at P10. On P10, page 203, PK 4, Code 04002, namely Development of Eco Park Forest Recreation, State Park, Eco and Tourism Area. Honourable Deputy Speaker, the Kota Damansara area has a forest reserve, the Hutan Simpan Kota Damansara. Here, the activities currently carried out in this forest reserve are mostly hiking. However, for everyone's information, this forest also becomes a place of interest when bird migration occurs, where various kinds of birds stop over in the forest area and it becomes a focal point for those who engage in photography. In English I do not know the term. But in Malay, menangkap gambar, those who do it call it "hunt for picture". Various species of birds can be seen in that area, but this activity is often obstructed by forest rangers. Even if it is permitted, there are certain amounts that must be paid, which are sometimes higher than usual. I request this because it has tourism factors and it is a forest in an urban area. I ask that tourism activities like this not be wasted with the bird migrations that stop here. Because these migratory birds do not stay and settle there; they are species that come from various areas to visit, from outside Selangor and even outside Malaysia. So this is a tourism potential. The tourism sector is something the Honourable EXCO or the State Government may look at. What potential can be realised.

The third issue is P14. Not the bird ranger, the Honourable EXCO. Forest ranger. Okay, if we look at P14, page 238. Page 238 is the Development Division of the Selangor Islamic Religious Department, PK3 for Code 03107, Masjid Kota Damansara 2. Kota Damansara would like to ask, what is the status of Masjid Kota Damansara 2? Is it now in the design and build process, or has the design been completed or is it at the consultant stage? Because we all know Masjid Kota, I first thank the Honourable EXCO, because Masjid Subang Bestari has been completed and is in use. Praise be to Allah, now the community in the area, especially those living in Subang Bestari, can use the mosque in the Subang Bestari area. But then, what about Masjid Kota Damansara 2? Because in the Kota Damansara 2 area, the population density is about 100,000 people. There may be fewer voters, but its total population is 100,000 people. So I believe that if, say, 60%, if we take a minimum of 60%, are Malays or Muslims, it is not possible for Masjid Kota Damansara 1 or Masjid Kuning alone to accommodate Friday prayers and other uses. I believe the Honourable EXCO can explain to Kota Damansara, what is the status of Masjid Kota Damansara 2? Because some of them have already made donations to the waqf fund, but nevertheless they still do not know its status. Although, according to this ruling, the intention alone is already sufficient and, God willing, it will be further managed by Allah SWT. But nevertheless some have asked, they worry that if they pass away, they will not see the mosque. But if we know the intention, that is already enough. But some still want to see it. That is part of the daily challenges, Honourable EXCO. Sometimes those who come to my office do not come to ask about other matters but about mosques.

Lastly, I want to ask about P13, page 219. If we look at 219, Project Code PK1, namely Code 01302, which is the Kampung Melayu Subang Flood Mitigation Project, Sungai Pelepas Phase 2. I want to ask the Honourable EXCO. The explanation from the Honourable EXCO. What is the status of this project? Because this year, next year RM1 million will be given, I want to know whether this is the final process for this project. If it is carried out next year, I humbly request the Honourable EXCO to have it carried out at the beginning or middle of the year. I am worried because sometimes these projects are carried out at the end of the year, for example a project carried out during this rainy season. Everyone knows that this morning many ADNs were oppressed. Stranded, not oppressed, I correct myself. I withdraw "oppressed". Stranded. Stranded because some areas were inundated by water.

Okay, the next item, the same P, also page 228, Project PK5: Project Code 05109 is Tasik Cova. I believe Tasik Cova is included in the schedule that has been laid down. However, even though the Honourable EXCO... Tasik Cova is one example of the failure that occurred last season. When it was developed, it was not monitored and was not handed over properly. As a result, to rehabilitate Tasik Cova, it requires a total of up to RM21 million. I believe RM21 million, just to rehabilitate Tasik Cova, is something very large. But even so, Honourable EXCO, in the surrounding area there are new developments. I believe that if there are discussions between the Drainage and Irrigation Department (JPS), the Local Authority (PBT) and the developers in the surrounding area, they may be able to help the Drainage and Irrigation Department (JPS) and cooperate with the State Government to redevelop Tasik Cova. Because Tasik Cova is important; it is a lake that collects or acts as a water catchment in the middle of Kota Damansara. If we leave it for a very long time, I believe the Kota Damansara area, especially the town centre itself, will experience flash floods or severe floods in the future, if we do not address it. Even if we want to address it, I understand that the cost burden is very high, up to RM21 million, which is not a small amount, but this is an inherited problem that we have to bear as a result of the failure of our officers. I think that is all from me. Thank you to the Deputy Speaker.

Deputy Speaker

Batu Tiga.

Assalamualaikum WBT and good afternoon. I thank the Honourable Deputy Speaker for allowing me to take part in the debate at the Committee stage. I will go straight to P13, the Selangor State Drainage and Irrigation Department (JPS). Praise be to Allah SWT, and thank you to JPS, because they have succeeded in reducing the flood hot spots in the Batu Tiga State Assembly seat (DUN) from 8, which began two years ago at the start after the elections, to 5 today by implementing several measures, namely the construction of a water gate at Padang Jawa, and another water gate system at Taman Intan, Batu Tiga. However, behind all this there are some matters that I wish to highlight, which have not been mentioned in detail or specifically regarding the neighbourhoods or places I am raising. But under PK1, under item 01300, Petaling District, it is only mentioned generally, namely Anak Sungai Anak Damansara Flood Mitigation Project Phase 2, Petaling District. I am not sure in which area, but what is happening today, which is under construction, is at Sungai Damansara at Kampung Kebun Bunga, Batu Tiga. Honourable, I feel this area needs a little more attention, because even though we are building flood mitigation that is being implemented today, there is a direct impact from that construction, namely the existing embankment, which this morning has already burst or water has entered through the embankment. This means, firstly, our water level is rather high compared with the existing embankment, and I also want to take this opportunity to say whether the flood mitigation we are building is sufficient in height. Because if its height is the same as the existing embankment, I think it will not be very effective. So it must be higher, and how much higher must take into account what. Because today the sea water level we face is only 4.5 or 4.6, but normally at Sungai Klang, if we look at its peak hour or peak season, it will go up to 5.8 or 5.5 and above. This means that if we take the rate at a water level of 4.8 with the flood mitigation height we are implementing, I think that is not enough. It must take the maximum, which means 5.8. So at Sungai Damansara, specifically at Kampung Kebun Bunga, I hope it will be refined. Secondly, at Taman Intan, also at Sungai Damansara, Taman Intan has been completed today, as I was informed by JPS, but as usual Honourable Member and Speaker, I feel it is somewhat awkward every time a project is completed, but we have to spend sometimes a longer time waiting for TNB supply. Yet we have planned this earlier. Can we not handle this project together? That means if we have a two-year project timeline, during that period or process we also apply to TNB, because I think it is not very nice when the project is completed but we give the excuse that the power supply is insufficient. So, it is not practical for us to do this, and I hope that if possible we can expedite the implementation of the water gate at Taman Intan, Batu Tiga, where only the water supply remains, as I have been informed.

However, there was an earlier request: at Taman Intan there is an embankment near the residential area, and that embankment once had water overtop it. But when I raised this previously with JPS to raise the existing embankment or wall, today I see it has not been implemented. Perhaps there is no additional allocation or something similar, I humbly request that this also be given attention. And for the Klang district, there is one area apart from Padang Jawa that has been completed, and its pump is functioning well. I have one more place, Taman Rashna, which still has no implementation at all and has not resolved the issue and existing conditions. Taman Rashna has repeatedly experienced floods, and also the Muhibah factory near Taman Rashna, as a result of the WCE project and so on. I hope Taman Rashna will also be given some attention, because it involves Sungai Rasau under item 01308. That is all, Honourable Speaker. I thank you for the opportunity given, and I request and await the reply from the Honourable EXCO. Thank you.

Deputy SpeakerEN

Honourable Paya Jaras.

Dato' Dr. Ab Halim Bin TamuriPAS · PNPaya JarasEN

Thank you to the Deputy Speaker. I want to go straight to two matters. The first is PK12-JKR, page 207, namely PK2 Petaling District, Construction of Bridges and Footbridges, Project 21021, Bridge at Jalan Kubu Gajah, Sungai Buloh. This project is part of the road from RTB Sungai Subang that is currently being built. I humbly ask the EXCO side to explain when this project will be carried out, because the residents' concern is that the area is like a large area, like a lake, but when the bridge is not built, it becomes small, like shrinking. So, the concern today is that when the water is strong, it may break the road and eventually cause flooding. Today the water has also risen, but not too badly, and the area has not overflowed. But if the water becomes stronger, it is likely that the bridge, if the flow is fast, may cause water turbulence and damage.

The second matter is the ongoing project PK13-JPS, Selangor Drainage and Irrigation Department, page 209, Project Codes 01201 and 01202, the Sungai Kedondong Flood Mitigation Project Extension and the Sungai Kedondong Flood Mitigation Project Phase 2, for which I thank you for the budget that has been provided. However, I would like to ask the EXCO for an explanation, because it involves the relocation of residents and housing in the related areas. So, have JPS or the District Office conducted engagement with residents on the project that will take place?

And secondly, is there any consolation or compensation given to the residents affected? I understand that the area is a river reserve, but the residents there have lived for almost 30 or 40 years, and various houses have been built there, which causes them concern about where they will go. So I humbly ask the EXCO whether some assistance will be given to them, perhaps compensation is not possible because the land is government reserve land, perhaps it is impossible to give compensation, but is there consolation or humanitarian assistance given to the residents because they have to move and find a new place. And do they have the opportunity to obtain a Rumah Selangorku that they can buy or rent, or rent out, for those who face difficulties? And if possible, I really ask the State Government, especially Petaling District, to hold engagement with the residents, involving other agencies to give support to them, because when houses are demolished and an area is to be built as a flood mitigation project, there will be social implications.

We understand the need to develop this flood-prone area, but in my view we must also consider how people who have lived there for a long time, 20 years, especially Malaysian citizens, can be assisted in the Sungai Kedondong construction project. Thank you.

Deputy SpeakerEN

Honourable Kampung Tunku.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Thank you Mr Deputy Speaker. I refer to P01 Office of the Menteri Besar and State Secretary of Selangor, pages 187 and 188, relating to PK1-Economy Code 01002 Industry and Investment and PK5-Education Code 05002 Higher Education Programme relating to the semiconductor industry. So first of all, congratulations to the State Government on the launch of the Malaysia IC Design Park in Cyberjaya. As someone who previously worked closely with SIDEC before becoming a State Assemblyman, Kampung Tunku first of all wishes to praise the agility and professionalism of SIDEC in developing the State of Selangor's ecosystem for sara and also in implementing the national semiconductor strategy holistically.

We are not merely attracting well-known companies such as AM and sara to set up at IC Design Park and they design chips. Even if they succeed in attracting semiconductor giants such as INTEL or TSMC, *with respect*, they skill up, they leave and that's it. In contrast, companies at IC Design Park 1 and 2 play a role in honing local talent through the Advance Semi Conductor Academy Malaysia (ASEM), where young engineers acquire technical knowledge and exposure to, *with respect*, chip design, testing, prototyping and validation. To further strengthen the talent pipeline, Kampung Tunku would like to propose that the State Government, through the Selangor State Scholarship Group Fund (Tabung Wang Kumpulan Biasiswa Negeri Selangor), review the list of universities and courses eligible for scholarships or loans so that it includes higher education institutions (IPT) that have strong semiconductor-related engineering programmes, especially in Asia, where tuition fees are more cost effective, *with respect*, compared with Western countries.

For the time being, the State Government has signed memoranda of understanding with IPTs such as National Yang Ming Chiao Tung University and also Indian Institute of Technology Madras, but we can take it further, *with respect*, for example with Ching Qua University, Peking University or the Korean Advanced Institute of Science & Technology.

The second point, under the same code, relates to the admission of persons with disabilities (OKU) to institutions of higher education. In August, a student with autism who is a person with disabilities was reported to have been blocked in the university central placement system, namely UPU. The student, known as Aniq, had selected the Computer Science, Mathematics and Statistics programmes in the second phase of the system. However, those choices disappeared at the next stage even though he had a sufficient CGPA and met the programme requirements. The good news at that time was that the Minister of Higher Education promised that the issue would be resolved, but what about other cases that did not attract public attention? Although the UPU system falls under the Federal Government, because Selangor has many IPTs, including Unisel, I believe it is important for the State Government of Selangor to liaise with the Ministry of Higher Education to ensure that all students, whether OKU with physical or mental disabilities, do not go through the same experience as Aniq. OKU students have the right to choose their dream course, and IPTs have a role in facilitating their academic journey, whether through the provision of OKU-friendly infrastructure or, *with respect*, flexible study arrangements that take into account the unique needs of OKU students.

I have also received feedback from OKU activists that these challenges or complications are caused by inclusivity guidelines, *with respect*, that differ between programmes and universities. Perhaps the Selangor State Government can lead the way, *with respect*, by proposing a single inclusive and universal guideline to ensure no student is left behind, *with respect*. This approach would also reduce the anxiety of those who are afraid to register themselves as OKU because of the stigma attached to OKU.

Next, page 188, PK6-Women, Welfare and Health Code 06003 Public Health Development. Kampung Tunku welcomes the State Government's intention to extend the scope of Selangor Mental Sihat to schools, involving the empowerment of teachers. Kampung Tunku would like to ask whether the State Government has audited the number of school counsellors in the State of Selangor and their qualification levels. What efforts or studies are there to streamline the qualifications of school counsellors so that they receive upskilling, *with respect*, to become nearly on par with registered counsellors under LKM? And besides that, what is the roll-out plan to schools? Does the State Government intend to target primary or secondary schools at the initial stage, and what outreach, *with respect*, is there to parents so that they are more receptive to the State Government's efforts?

Finally, PK7 Youth and Sports Code 07003 Sports Development. Kampung Tunku welcomes the increase in allocations in conjunction with Sukma and Para Sukma 2026. However, I hope these efforts will not stop at Sukma; the State Government should also help core sports obtain their own home ground. Kampung Tunku represents rugby in Selangor as well as alternative sports that require cow grass pitches, *with respect*, such as Ultimate Frisbee, Flag Football and American Football. Such sports find it difficult to obtain venues for training and to organise matches at national or international level, due to a lack of stadium facilities and the dominance of football, which sees many cow grass pitches being converted to artificial turf.

In a previous State Legislative Assembly (DUN) question in 2015, by the former ADUN for Hulu Kelang, Honourable Tuan Haji Saari bin Sungib, there were 413 football fields under the supervision of the Local Authorities (PBT) in Selangor. As for the number of public rugby fields in the Klang Valley, there are only three, namely the Astaka Petaling Jaya field, the AU2 field in Ampang Jaya and the Merbok field in Kuala Lumpur, outside Selangor. Combining PK7 Youth and Sports and PK5 Higher Education, Kampung Tunku ultimately wishes to propose that talented state athletes be given the opportunity to join the Selangor Internship Programme for Aspiring Ready and Knowledgeable Talents (SPARC), *with respect*. Such an initiative would show the care of the Selangor State Government, where we not only expect outstanding athletes on the sports field but also gain training and skills, job opportunities, and encourage our athletes to join the Selangor state civil service system. That is all, thank you, Kampung Tunku.

Deputy Speaker

Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

Thank you Mr Deputy Speaker. I would like to refer to page 189, PK 12 - Environment. The environmental programme has been allocated only RM2 million this time. Considering that programmes conducted such as the environmental carnival, the plastic-free carnival, SELKITAR and so on are very much needed, I hope the environmental programme allocation can be increased in future to ensure that awareness campaigns can be carried out more efficiently.

Apart from that, page 190, PK14 - Libraries. For me, libraries are an important space for community children so that they have a free and healthy place to hang out. Not only children, senior citizens can also make libraries a place to spend their leisure time instead of coffee shops or other places that require spending money. Since places for children and senior citizens are really insufficient, and for Seri Kembangan alone, actually there is not a single library within Seri Kembangan, especially PPAS. Previously we proposed to MBSJ and also PPAS to rent units at Plaza Serdang Raya, namely units 204 and 205, but the rent charged by MBSJ was RM26,469 a month. So, I hope this rent can be reduced so that PPAS can afford to rent to set up a library for residents of Seri Kembangan.

Besides that, page 190 also, PK15 - Housing and Urban Welfare. I would like to get the attention of the Selangor Government on the issue of Selangor's Air Selangor bulk meters. Bulk meters are the main meters used by high-rise residential buildings, which are read by the water company. The reading is the total consumption of the whole high-rise residence. But not all flats or high-rise residences have migrated to individual meters, and due to many issues such as leaks and water theft, many low-cost flats are facing problems paying the Air Selangor bulk meter bills. For example, Red Ruby 2 under the account of its developer, Sin Hiap Lee Development Sdn Bhd, owes Air Selangor RM558,466.80 up to the end of October 2025. So, one of the main issues for the Red Ruby 2 apartments having such a huge debt is due to meter damage and leakage of almost all water pipes. Although we have repaired all the water pipes, the debt is truly unaffordable for any residents there. Besides that, I also want an explanation from the government regarding the lack of allocation for TEPAT, namely the Abandoned Project Recovery Fund (Tabung Pemulihan Projek Terbengkalai). According to LPHS, there are still 166 abandoned projects in Selangor as at 31 January 2025. I hope the Selangor government can work together with KPKT, because according to news reports of 15 November 2025, a total of 1,289 abandoned private housing projects have been successfully revived by the Special Task Force of the Ministry of Housing and Local Government (KPKT) from 2023 until September 2025. So, if we indeed have no allocation, I really hope for closer cooperation with KPKT.

The next issue is page 249, P 17, PK 4 - Veterinary Health. The problem of stray animals such as cats and dogs in Malaysia, especially in Selangor, is increasingly worrying and has become a societal issue that demands immediate action. This issue not only affects public cleanliness and order but also raises concerns in terms of the safety and welfare of the animals themselves. Most developed countries such as Japan, Bhutan, Germany, the Netherlands and Taiwan have succeeded in controlling stray animal populations through the implementation of systematic, humane policies that involve the community. Among the strategies that have achieved positive results are the implementation of TNVR, namely trap, neuter, vaccinate, release. The use of microchips for identification, early education from a young age, as well as the active involvement of local authorities, NGOs and volunteers. The stray animal issue is not just a matter of public cleanliness or safety, but reflects the level of compassion and humanity of a society. The proposal to implement this TNVR programme is a proactive, integrated and humane step in ensuring a balance between the harmony of the human community and the protection of other creatures that also inhabit this space. I would like

to get clarification from the government: will a programme like this be considered for inclusion in the caring community programme or not? Thank you.

Sementa.

Deputy SpeakerEN

Sungai Burong. Kuang first, or Sungai Burong first?

Kuang dulu.

Deputy Speaker

Kuang dulu.

Alright, thank you Mr Speaker. I would like to draw the attention of the whole House. Our Embargo Book, the Budget Estimates book, has been on our desks since the first day. We have received it. Most State Assemblymen in this House have also debated this matter, and every State Assemblyman has been given the opportunity to debate from the beginning. I am still outside here, and I see many Honourable Members here are restless outside. Dusun Tua has flooded, Pelabuhan Klang has flooded, and many PPS problems have also been opened up, but most State Assemblymen are still debating, when this should have been debated earlier. If we want to debate today, go directly to the VOTES, what we want to debate and ask for explanations from the State Government only in relation to these allocations. If we all continue debating, I don't know when we will finish the Order of Business for today. So, what I find more strange is that the Government side is doing more of the Opposition's work. So give the opportunity to the Opposition side to debate this matter and we focus straight away so that all our Order of Business can be settled quickly and all Honourable Members can return to their constituencies to deal with the flood problems that have been reported outside. Thank you, Honourable Member.

Deputy SpeakerEN

Thank you Kuang, perhaps we can shorten the debate a little. Let's continue with whoever stood up earlier, Sungai Burong. Sungai Burong, who stood up.

Thank you Mr Speaker and the esteemed Members of the House. Sungai Burong wishes to link or raise PK1-Economy under project code PO 01 Office of the Menteri Besar and State Secretary of Selangor. The Government allocated RM6 million for economic research and development compared with the total allocation of RM27.5 million. So, my question is that I ask the Government to detail the distribution by region and also state the justification.

Second, how does the Government ensure that the RM20 million in the Selangor Budget 2026 truly provides leverage to the RMK-13 allocation worth RM145 million and not merely becomes a matching fund without clear impact on the ground?

Third, from the list of IDRISS components, which projects have been given priority status for 2026, and based on what criteria was that selection made? And fourth, how is IDRISS integrated with the development of traditional villages, modern agriculture and B40 communities in South Selangor to ensure that the benefits are not limited to the industrial zone only?

And fifth, from the list of SABDA components, which projects have been given priority status for 2026, and based on what criteria was that selection made? So, referring to the latest Sabak Bernam District Council Local Plan, the State Government has placed priority on high-impact projects in RS-1. Therefore, is the actual status of projects in the Quick Win category and medium-term projects...

Second, P13 Drainage and Irrigation Department (JPS), page 220, PK1 Project Code 01408 Sungai Tengi Flood Mitigation Project, Kuala Selangor, has an allocation of about RM50 million, whereas this flood mitigation project this year has only RM10. I ask for an explanation why, in the areas involved that flood every year and during the monsoon season, there is no development project for the 2026 Budget year.

Next, P13 is still JPS, page 229, PK5 Project Code 05201, namely PISMA Various Districts. So, I want to ask whether Parit 4 in Sungai Burong, namely the water gate to the sea, the river water gate to the sea, is involved, because so far, including during this flood period, it has only been maintained manually by JPS, yes, while the water keeps rising and the pictures are very sad, the water gate is covered, if you want to get out it looks like this, gentlemen. So, it is not clear whether it is included in the project under the code mentioned.

Likewise at Parit 3, Parit 2, the village where the trench digging is not deep enough and maintenance is rather weak there, causing the plantations of the village people in the Parit 3 and Parit 2 areas to be submerged, especially oil palm when struck by water, the yield to be produced is stunted and does not produce output. So, in this PISMA Various Districts project, are Parit 2 and Parit 3 involved for that purpose.

Third, P13 is still JPS, page 230, PK6 Project Code 06112. Here, although it involves the Sabak Bernam district, the Sungai Leman Coastal Embankment, I see there is no project at Parit 4 at the moment, sorry, Parit 5, in the Sekinchan area, namely the embankment that has burst. It has burst for the second time and it caused water overflow into our DUN, in the DUN of Sungai Burong, involving no less than 7 to 8 houses, causing floods, moreover during the worrying Northeast Monsoon. So, is that project included in the Parit 5 embankment or not?

Including project code 06113, both are written blank, and where should this matter be directed? Because it does not look like the flood problem can be solved with the RM10 allocation provided.

And finally from Sungai Burong, code P-14 JAIS - Selangor Islamic Religious Department (JAIS), page 236, PK1 Religious Schools. As per the debate that Sungai Burong raised earlier, the response from the Honourable EXCO Seri Setia stated that there seems to be a plan for these towns and a school project was built to meet the high demand, and we know that these religious schools produce good human capital because we have heard recent cases that are truly frightening. So it seems that in the RMK-13 plan, including the Budget or Budget 2026, under the code I mentioned earlier (Project Code 01900), there is none, it only exists in the Kuala Selangor urban area. So what is the long-term plan across all major towns, especially if related to our district area in Kuala Selangor which really wants more than one religious school because of its rather urgent needs. So thank you Mr Deputy Speaker for the opportunity. Assalamualaikum.

Deputy SpeakerEN

Honourable Member for Kajang.

Tuan Cheong Kian YoungPKR · PHKajangEN

Thank you, Deputy Speaker. Kajang would like to raise several issues and proposals that the government needs to pay attention to. Page 200, Selangor State Department of Agriculture. Sub-head 19 – Agro Food Park (AFP) Development Programme and Potential Land. Kajang would like to address Project Codes 19001, 19002 and 19003.

Kajang notes that the State Government contributes only just over RM1 million, compared with the federal government which contributes over RM12 million through RMK-13. Therefore, Kajang would like to ask the State Government what measures or methods are being and will be taken by the State Government to ensure that the food supply chain in the state of Selangor remains in good condition without having to depend on imports, whether domestic or foreign? Kajang hopes the State Government can explain the matters raised by Kajang.

Page 245, Selangor State Department of Town and Rural Planning. Kajang would like to address sub-head 1 for Project Code 01003, namely the Special Area Plan (RKK). Kajang would like to ask what projects or programmes will be implemented through this RKK. Can the allocation channelled to this RKK be used for projects to beautify urban areas in Kajang? Kajang has raised and proposed several places that could be developed as new attractions in Kajang. Old buildings in Kajang have great potential as historical and heritage value for Kajang, and this matter will provide room to strengthen the tourism industry in Kajang. Therefore, Kajang would like an explanation as to whether this RKK focuses on beautifying existing areas or is more oriented towards areas yet to be developed. Kajang requests an explanation on this matter. That is all, thank you.

Deputy SpeakerEN

Thank you, Honourable Kajang. Honourable Members all, since the Order of the House is still long, the House needs to be extended today to continue the Order of the House. I invite the representative of YAB Dato' Menteri Besar to move this motion.

Tuan Ng Sze HanDAP · PHKinraraEN

Deputy Speaker, and Honourable Members all. I would like to move a motion which reads as follows. Whereas the House sitting today, pursuant to Standing Orders 11 and 26 (4) of the Standing Orders of the Selangor State Legislative Assembly, shall extend the Sitting until all Orders of the House have been completed.

Dato' Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

Mr Speaker, I second the motion.

Deputy SpeakerEN

Honourable Members all. This motion has already been seconded. I put it forward to seek agreement.

Honourable Members who agree, please say "yes".

Honourable Members who do not agree, please say "no".

The motion is agreed.

Who stood up just now? Sungai Panjang. Please proceed.

Tuan Mohd Razali Bin SaariPAS · PNSungai PanjangEN

Thank you, Mr Speaker. As we want to finish everything, Sungai Panjang will try to be brief. Page 187, PK 2 Rural Areas. Due to RMK-13 from 2026 to 2030, there are national targets that Selangor must meet, among them reducing urban and rural pockets. So in terms of income and access to basic services, and also transforming Traditional Villages and New Villages into more productive villages. Rural Selangor, especially Sabak Bernam, Kuala Selangor, Hulu Selangor, is still trapped in the mid income rural trap, with permission. Sungai Panjang's question refers to item 02002 – Socio-economic Development. The government has allocated RM19.4 million, and with this amount, what are the specific indicators for 2026 to measure the success of rural socio-economic development in line with the RMK-13 targets, including employment opportunities, household income and access to basic services in rural areas, internet and so on?

Item 02003 – Traditional Village Economic Development. Please provide details of where this allocation will be used.

Item 02004 – Village Development. To what extent is village development expenditure in 2026 aligned with the actual needs of the mukim and rural zones in Selangor, and what success indicators have been set to meet the RMK13 target of narrowing the urban and rural gap? Request a list of the DUNs involved, and also request that the Government state the actual 2024 performance.

Item 02005 – Basic Facilities or Village Infrastructure. What is the RP1 target for improving village basic facility coverage such as roads, clean water, internet, drains, village housing in Selangor, and how will the Government ensure a minimum coverage of 98% in line with the RMK-13 target? Request a list by DUN.

Item 02006 – Upgrading or Rehabilitation of Rural Roads. Request the government to detail the total number of rural roads in Selangor targeted for upgrading under RP1 2026, and the extent to which the effect or impact of this project contributes to achieving the RMK-13 target for rural economic connectivity.

Then, Sungai Panjang moves to Project Code PK4 page 214, 04900 – Sabak Bernam 04902. Sungai Panjang would like to ask, this has entered development three times now, and would like to ask the status of this Jalan B44 project, which is the longest road in the state of Selangor. It is almost a race track, from its three-way junction all the way to the Hulu Bernam border. So this allocation only reaches Parit 4 Timur, and the current need is that this road needs an emergency route, because there are already many schools, and the latest is that Sekolah Binjai has been upgraded up to SK11, meaning the motorcycle route needs to be on the B44 route.

And the second last, last but not least. Flood Mitigation Project Development. Please provide the progress on Project Code 01705.

And the last one, Upgrading. Project Code PK6 06110 – Upgrading the Sungai Nipah and Pasir Panjang Coastal Bund, Sabak Bernam District. Sungai Panjang requests the progress of this project.

And the very last, Project Code PK8 08201 – which is to Build and Complete an Office Complex for the Sabak Bernam District Irrigation and Drainage Department. The people of Sabak Bernam have been waiting for a long time, and we request the progress of this project code, because there is a concern that the existing place will be used as a hangout or a gathering place for unhealthy activities. Thank you.

Deputy SpeakerEN

Honourable Bukit Gasing

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Deputy Speaker. I will also touch on several matters in this Development Motion. But first, to my colleague from Kuang: if you need to return to your constituency, then go back, but this Sitting of the House is a place for ADUNs to give proposals to the Government and raise constituency issues and so on. So we should not restrict ADUNs from raising issues, and today I would like to raise six issues and one question.

First, regarding ICT development and Smart Selangor under PK1, I have always supported the State Government's efforts in developing Smart Selangor. I would like to ask what the State Government's progress is in digitalising all counter services in all government agencies, especially the PBT, District Offices, but above all the entire State Government agencies.

In this era where almost everyone has a smartphone with internet access, I hope we can facilitate access to government services for all the people. There is no need anymore to queue at counters in government offices for any transaction. Those counters should not be closed yet. There are people in our community who need to come and do it manually, but for those who prefer to conduct their transactions online, we must provide those services fully.

So I would like to ask who the State Executive Councillor (Ahli MMKN) responsible for ensuring that all services existing in all State Government agencies and offices have online services is. What is the progress? Have we reached the level of 70%, 80%? How many more services still cannot be implemented online? And in which year will we finish implementing all services online? That is the first.

Second, for transport issues, allow me to propose BRT services. I am very pleased that BRT services have now become widespread and famous. When we started the shared van service in Petaling Jaya in 2021, many had never heard of this concept, where we use vans on a shared basis, and the BRT concept had never been heard of by the people in Malaysia. But now we have many services. Rapid KL has even bought 300 vans to provide services across the Klang Valley and also in other states. I propose that at that time, a few years ago, it was indeed necessary and good for the State Government to be involved in BRT services in urban areas.

I propose that for the 2026 expenditure and onwards, the State Government's BRT services be focused on rural areas. Urban areas have been widely served by Rapid KL, and I see the trend that it will increasingly add BRT services in urban areas, but in rural areas we must reach a certain level that, even in Pekan Sungai Besar, even in Sepang, tourists, visitors and locals can move without their own car. This is a service that can develop rural areas and can provide comfort to residents in rural areas.

Third, the housing issue. Thank you to the EXCO for housing who is present in the House. I would like to raise three issues. The first is transit housing for young people. This matter has been discussed several times, and I thank you. We have various SelangorKu housing programmes for buyers, the SMART Sewa programme for tenants, but how about a programme for the short term, perhaps six months or a year, for those who need temporary housing? Does the State Government intend to develop a scheme for this group?

The second under housing is a housing scheme especially for senior citizens and single persons who do not need a three-bedroom house. Currently, all our housing programmes, from PPR to SMART Sewa to the SelangorKu housing sales programme, are three-bedroom houses, whether 750 square feet or 1000 square feet, are three-bedroom houses. But where we see cases of single senior citizens, they can share with two others in one house. We can rent out room by room, and if three people live in one house, there is also social interaction, which is good for them. Can the State Government consider starting a scheme like this? Looking at our neighbour Singapore, they also have such a scheme where two single adults who do not own a home are shared in one house. Not only does it help in reducing costs, if we rent out one flat under the SMART Sewa scheme to them, the three bedrooms are not needed by them; they live in one room, the other two are empty or the cats live in the other two rooms. But if we match those who are suitable, they share one apartment, then costs can be saved, and socially, they have that social interaction.

And third, the issue of maintenance of low-cost flats. I welcome the Ceria scheme that is still ongoing in our development budget. I hope the scheme to take over maintenance, as mentioned in the previous election manifesto, can be started as soon as possible. If it were not in the manifesto I would not say it today, but because it is in the manifesto, I hope the implementation of taking over low-cost flats can be accelerated to safeguard the welfare of residents there, so that when the flats are maintained perfectly, the quality of life of our poorest people is protected.

I now move to the next topic, industry and investment. We often hear of the State Government's efforts to attract investment into the state of Selangor. I congratulate and thank the State Government for its various successes in attracting investment into Selangor. I would like to ask about the State Government's efforts to promote exports and help companies established in the state of Selangor increase their exports overseas. I think this matter is also important in helping economic growth in Selangor. Every item exported abroad helps increase the value of our currency, and every item we export helps increase the income of our people.

Fifth issue, tourism. I will touch briefly on tourism. What is the government's strategy to help tourism in urban areas? Many of our tourism products are in rural areas, on the beaches, in forest recreation areas, but in urban areas, what is our tourism strategy? I see a popular website, Klook. If we look at some destinations, there are various types of tour experiences and so on that visitors can visit in those cities. If we look at New York, look at Singapore, look at Bali, there are plenty of products, but if we search for Petaling Jaya on Klook, we rarely find any products. If we want to encourage tourists who come to Kuala Lumpur to also use tourism products in Selangor, we need to increase promotion, and I would like to encourage the State Government's efforts to develop tourism, to not forget to develop urban area tourism here.

Second, AirAsia is a big hub and a major movement of people in this region. Many people stop over at KLIA to change aircraft, a fairly large transport hub. I would like to encourage the State Government of Selangor to work with AirAsia, introduce a stopover of one night, two nights or three nights in the Klang Valley, so that those travelling between Thailand and Australia can choose to add a two-day stay in Kuala Lumpur, or when they stay in Kuala Lumpur, the potential to stay in Selangor for them to experience a day or two in Malaysia while they travel from Kazakhstan to Australia or from Turkey to Japan. When they change aircraft at KLIA 2, do not just stop for three hours, perhaps they can stop for three days. But this effort requires coordination, and I would like to encourage the State Government to work towards that. It also requires cheap transport from KLIA to areas in Selangor, for example from KLIA to the Sunway Lagoon and Sunway Pyramid areas, how do we get there now? Generally, their only option is Grab. If they want to use cheap transport, they can only go to KL Central from KLIA. Where are the bus connections from KLIA to Bandar Utama, from KLIA to Sunway, KLIA to Kajang and so on? This matter can help increase short-term tourism for those who stop over.

Sixth issue is the monkey issue. In the Bukit Gasing forest area, monkeys are increasingly coming out of the forest because they feel stressed, they really want to look for food and enter residential areas. The Section 5 area surrounding the Bukit Gasing forest area often receives complaints about monkeys, which are getting more violent and aggressive year by year as they come out of the forest. I would like to ask the State Government, the Department of Veterinary Services, or any other agency, how we are going to address this issue. Because just asking residents to tie their rubbish bins is no longer enough. These monkeys even enter houses, enter kitchens to look for food, and I hope we can consider efforts to relocate these monkeys from the Bukit Gasing forest to a more suitable forest for the comfort of the monkeys and the comfort of the people living around the Bukit Gasing forest area. Perhaps development projects in Kuala Lumpur are increasingly approaching the forest area and reducing the roaming space for these monkeys, but whatever it is, because this problem is ongoing, something must be done.

Finally, after the six issues I have raised, one question I noticed is P01 item PK19, two hundred and forty-one million ringgit allocated for miscellaneous. I would like to ask the State Government whether these miscellaneous items are projects that have been identified, because the figure of two hundred and forty-one million is a large figure, more than ten percent of our development budget. Have the projects here been identified or not yet identified? What is the reason, these miscellaneous items, usually "miscellaneous" is a small figure, but this time this miscellaneous is "others", and others is a very, very large figure, exceeding all other items in this development budget. So I request an explanation from this government. Thank you, I support this motion.

Deputy SpeakerEN

Thank you, Bukit Gasing. Are there any more? Opposition debater, Permatang, please proceed.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Thank you, Mr Speaker. Permatang would like to draw the attention of the House to PK 2 Rural, Project Code PK2 Rural, Code 02003, Rural Tradition Economic Development. Permatang would like to draw the attention of the House to the potential of village tourism for developing the traditional village economy. Given that the Budget allocates only RM2.5 million for the whole of Selangor, which is rather small. Therefore I would like to propose that the State Government gazette the coastal and river fronts in northern Selangor as tourism zones. For example, this would include Sungai Ban Cannal, Sungai Pasir and Sungai Pasir Penambang, to enable the development of village tourism infrastructure and also allow more business licences and village homestay licences, and also provide incentives for local operators to attract, to increase the economy in the northern Selangor area, including the Permatang area. So this gazettement is seen as opening new economic opportunities for village residents and also increasing the value of the area in a planned manner.

Secondly, Mr Speaker, under the Development Expenditure Estimates, PK 4, Social, the allocation for Disaster Code 04010 totals RM500,000 for the whole state of Selangor. We see today itself, we see that flooding has already begun in many places, and many areas, including Permatang, also have floods and are experiencing this disaster. So, according to last year's report, the State Government recorded flood losses alone reaching RM22.6 million, far larger than this RM500 thousand, as we can see. We also had a tragedy, we cannot forget the Putra Heights gas explosion tragedy, which until today, we see, still leaves many families seeking solutions. For example, some have complained that the third phase of aid, they say the rent is still delayed and they still bear the restoration costs. So we see that the disaster allocation seems rather small, because we see today alone that many areas are already, are facing floods.

Then, Mr Speaker, thirdly, I would like to touch on PK 7 Young Generation and Sports, Code 07003, which concerns sports development. I would like to put to the House matters relating to the answer I received from the State Government regarding the question on the construction of a lawn bowling green in Kuala Selangor. So, in the official answer of the House that I received, this green cannot be provided in Kuala Selangor because focus is given to the SUKMA 2026 facilities. However, I would like to remind this Honourable House that SUKMA, as we can see, is focused only on urban areas. We in the rural areas here in Kuala Selangor, when we ask for a lawn bowling green, ask, I also asked for the repair of the football field too, the same answer is given: no allocation can be provided, because the focus is on the SUKMA that will be held. So I hope this Honourable House can look into this, because my hope is that our sports development should not become like, with respect Mr Speaker, a bandar-centric approach, while our district in the rural areas continues to appear marginalised. I also wish to ...

Deputy SpeakerEN

Seri Serdang wishes to interject.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Earlier I heard Permatang's debate regarding Putra Heights. I would like to ask Permatang, did Permatang go down to Putra Heights to see for yourself the development and the work that we have carried out at Putra Heights?

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

I was actually involved myself from the beginning, from the disaster, and there were also complaints to me about Putra Heights and the disaster, so the request to ask about the third phase, the housing rent, that is what I raised earlier. Because there are, with respect Mr Speaker, for the knowledge of the House, I also have lawyers for Putra Heights and so on, who state that they are wondering about the third phase rent; they say the rent was promised for one year, but now they have only received the first and second phases. So this has come out of the development expenditure; I hope I can continue with our development allocation.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

But I think it is far from Kuala Selangor to Putra Heights, it is a long way. The distance is far. Because there are two Members of Parliament here, still alive. Seri Serdang and this one. So I think perhaps Permatang needs to refine each complaint more carefully, because complaints are sometimes emotional and so on.

Deputy SpeakerEN

It's alright. Continue.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

I think you can focus on your own constituency.

Deputy Speaker

Teruskan Permatang.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

I have to answer, Mr Speaker, since he has asked. Because

Deputy Speaker

Kenapa?

Tuan Preakas A/L SampunathanDAP · PHKota KemuningEN

Permatang, regarding Putra Heights just now, the Third Phase was already paid this week. Did the people who complained to Permatang tell you they had received the Third Phase? No? No?

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Okay. I too, since Mr Speaker, I have to answer. He has asked.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

It's alright. It's alright.

Deputy SpeakerEN

Summarise. Summarise, please.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Since today is only Monday, what I was also told is that the last one was on Friday, so perhaps he only received it today. Perhaps this morning he has not yet had time to speak to me. So if it concerns asking why from Kuala Selangor to Putra Heights, that is our responsibility, we here, Perikatan Nasional, we are here to look after Selangor. Not only in my constituency. But I am also as, as, as, the Director of Information, I

Deputy SpeakerEN

Permatang. Continue the Permatang issue.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

If Permatang looks after the Selangor area, how is it that Permatang does not know that the third payment has been settled?

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

May I continue? I think I can continue, Mr Speaker. Hah?

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

If Permatang says he looks after the whole of Selangor, how is it that Permatang does not know the payment for the third time has already been settled?

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

I will continue. Today is only Monday.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

So I think that is not accurate. If Permatang looks after the Selangor area, how is it that Permatang does not know that the third payment has been settled. If Permatang says he looks after the whole of Selangor, how is it that Permatang does not know the payment for the third time has already been settled.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

I will continue, Mr Speaker.

Deputy SpeakerEN

Continue the debate, Permatang.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatang

Saya rasa.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

I think that debate is not appropriate. That is why I said, focus on your own constituency. We two are here. The ADUN for this area is here. We have not said anything. No need to interfere. Just look after your own constituency. Don't meddle in other people's affairs.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

I think Seri Serdang is evidently emotional today. When I debate about this.

Honourable Speaker, are we debating the Budget or debating something else?

(House in uproar)

Deputy SpeakerEN

Three people are standing up. Three people standing.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

My purpose now is that I would like to ask the House......

Ruling. Ruling. Ruling. Ruling, Mr Speaker. Are we debating the Budget or what is this?

Tuan Preakas A/L SampunathanDAP · PHKota KemuningEN

Mr Speaker, I seek permission. Is this the Standing Orders or what?

(House in uproar)

Deputy SpeakerEN

Now it is the debate, the floor is Permatang's. Permission must be obtained. Standing Orders. Permatang. Does Permatang give way to them who are standing? No. Permatang, continue.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

If that assistance has been given this week, which began this week, Monday, I thank you. And I hope everyone will get, this allocation can be given, to everyone. That is all. So if we have already received it, Alhamdulillah, and I thank you.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

If not received, the two of us here will make noise first.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

I am only conveying what was complained to me. I think that is enough, perhaps, Seri Serdang. I still have more debate to present.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

I think focus on your own constituency, no need to interfere in other people's affairs. We two know how to look after our constituency.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Oooo, if that is so, we must look at the whole of Selangor. We want to achieve Greater Selangor.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Wanting to look after the whole of Selangor. Already received payment and didn't even know.

Deputy SpeakerEN

Permatang, continue. You have a few minutes left.

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

So at this point I would like to bring it back to my constituency, Permatang, since earlier I have already, I asked for more time from Mr Speaker, even though today there is no pantun because we want to hurry. So, okay, earlier it concerned the lawn bowling situation. The lawn bowling green. Because I want to draw the House's attention that the answer mentioned that if there is high demand, then lawn bowling can be provided. So I want to draw the House's attention that we have two schools, namely Sekolah Menengah Pengkalan Permatang and Sekolah Kebangsaan Kuala Selangor, where these schools have produced many lawn bowling athletes at the level, not only at state level but also at national level, Mr Speaker. And what is even more proud, a native son of Kuala Selangor, a native son from Permatang itself, Cik Farah Ain from Kampung Sungai Yu, Mr Speaker, has been crowned the best lawn bowling player in the world and also world champion. So I would like to request the House's attention so that some attention is given to the lawn bowling green in Permatang, because in Permatang, in our area, lawn bowling is one of the very, very important sports. Not only pickleball. Pickleball is not in Permatang. We only have lawn bowling.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Do you support the Budget or not?

Puan Nurul Syazwani Binti NohBERSATU · PNPermatangEN

Mr Speaker, I would like to continue on PK14 Project Scope 14008 regarding the Library Upgrading earlier, the Tanjung Karang Branch. Because I want to ask just one thing, I hope a definite date can be given for the completion date of the new library in Tanjung Karang. Okay. Then Permatang continues with PK18 Iltizam Selangor Penyayang Programme, Project Code 18002 Women's Health Scheme. I would like to raise the issue that I see as a critical issue regarding the Selangor Women's Health Scheme under Iltizam Selangor Penyayang. Because I see this programme is a very good one, because it protects and looks after women's health. However, I see in this Budget, in this book, in this expenditure, I draw attention that there is not a single Budget figure specific to this programme for next year. So I would like to ask the House what is the status of the incentives under this Women's Health Scheme? Then, I would like to continue to PK18, Mr Speaker, Code 18009, Golden Age Friendly Scheme. In the 2026 Budget, the State Government, in its speech, allocated a total of RM55 million for the RM150 voucher for senior citizens and persons with disabilities through SMUE. This is one good welfare programme that I see in Selangor. However, new applications have been closed online since 1/12/2024. So we do not know when it will be reopened. And this has caused many senior citizens who have just reached the age of 60 not

to be able to enjoy this incentive. So I would also like to ask, because since the 2024 Budget year this programme was said to be digitalised. So my question is, when will this programme be fully digitalised. And also, I would also like to ask the House, because if we look at this PK18 just now, in PK18 just now it records this Budget as amounting to RM49 million. But in the Budget speech delivered by the Honourable Menteri Besar it was announced as RM55 million. So Permatang wants to ask, what is the actual value of this SMUE, is it RM49 million or RM55 million. Because this difference is rather, not small. So finally, Permatang would like to propose that for a programme as good, ahhh, I praise this, an initiative as good as SMUE, to further improve it. We hope that the vouchers are not only used at certain shops, because many of us in Tanjung Karang, we have many sundry shops. So if Permatang proposes that if it is said to be digitalised, how about if it is better if this programme is, changed to e-wallet, for example, so that these senior citizens don't have to travel far just to redeem these vouchers. Thank you, from Permatang.

Deputy SpeakerEN

If there are no other Honourable Members who wish to debate this Development motion, anyone else? If none, I invite the State Executive Council (MMKN), anything to say? Would the Member of the State Executive Council like to give a short winding-up? Yes, Sungai Air Tawar.

Datuk Rizam Bin IsmailUMNO · BNSungai Air TawarEN

Assalamualaikum WBT. Salam Kita Selangor Membangun Bersama. Thank you, Mr Speaker. I rise to wind up the issues and matters raised by the Honourable Members concerning the rural development portfolio under code 02006. The Honourable Member for Ijok, Damansara, Kota Damansara, Sungai Panjang and other Honourable Members raised matters relating to the upgrading and rehabilitation of rural roads.

For the information of the Honourable Member, regarding Ijok, the matter concerns the encroachment of land or an access road. Under the existing encroachment policy, the road in question cannot use State Government allocations because it is private land and is not reserved under the State Government. However, if the land is reserved as Government land, an application may be submitted to the PDT in the area concerned. As for the upgrading and rehabilitation of rural roads, applications may be forwarded through the respective District and Land Office (PDT), which will then be submitted to the Allocation and Development Section of the State Economic Planning Unit (UPEN) for consideration and approval based on current priorities. Regarding the application

For the Honourable Member for Sungai Panjang, to obtain the details of projects by DUN, I do not have a full list at this moment. This matter will be examined by UPEN and a written reply will be provided to the Honourable Member based on the information currently available. I also take note of the comments by the Honourable Member for Kota Damansara regarding the RM1 million allocation by the State Government for upgrading and rehabilitating rural roads, which was described as insufficient for rural roads in the State of Selangor. In addition, as a further point, and for the information of the Honourable Member, KKW also adopts the implementation guidelines for village access roads, including those relating to the scope of work, guidelines and procedures for maintaining rural roads using MARRIS allocations. It is hoped that through this cooperation the Federal Government can cover the constraints of the State Government's allocations and these rural roads.

Regarding the application for the rehabilitation of rural roads in the kampung area of the Honourable Member for Kota Damansara, I ask the Honourable Member to submit the application to the PDT and provide a copy to me so that it can be examined next year.

Next, also regarding the proposal of the Honourable Member for Kota Damansara, concerning libraries. In general, libraries fall under the Selangor Public Library Corporation (PPAS) and will be answered by the Right Honourable Dato' Menteri Besar. However, in terms of the existence of village community hubs, including library elements under the urban area, the State Government, through the Department of Town and Rural Planning (JPBD) under PLANMalaysia Selangor, has indeed implemented the construction of SMART Village Centres. At this time there are 5 SMART Village Centres developed in the areas of existing village halls, namely at Kampung Endah, Kuala Langat, Kampung Sungai Tawar, Sabak Bernam, Kampung Seri Taman Baru, Ampang, Kampung Budiman, Petaling and Kampung Telok Gong, Klang. At the same time, as initiated by the Right Honourable Dato' Menteri Besar, the State Government is also committed to strengthening synergy with MBI's subsidiary, particularly SMARTSel, to intensify efforts to provide SMART Village Centres in every DUN in the State of Selangor by the Thirteenth Malaysia Plan, or RMK13. The State Government is also confident that the SMART Village programme will not only bridge the digital divide between urban and rural areas, but will also make village communities knowledgeable through library elements, computer centres and shared spaces that can be used as tuition centres or places of learning for young people in the kampung.

The Honourable Member for Sungai Burong raised matters relating to the selection and priority of projects under the Sabak Bernam development area (SABDA). For information, the Sabak Bernam Consultative Council (SBCC), as the Regional Development Authority for SABDA, has decided that every project, programme and initiative (PPI) under SABDA must be thoroughly evaluated, and only PPIs that are feasible and capable of complying with the actual land conditions, and that offer investment opportunities for the state and local economy, will be selected and approved for implementation. To preserve the identity of traditional villages and to maintain their lifestyle and natural environment, the Sabak Bernam application has been designed with initiatives to enhance

the local economy, which has high potential. These high-potential economic activities are eco-agro tourism, namely making Sungai Tawar, among others, a State Heritage Traditional Village Hub and a State Security Supply Hub, particularly in the agricultural and fisheries sectors. That is why the Sabak Bernam Consultative Council has requested MBI and the Department of Town and Rural Planning, namely under PLANMalaysia Selangor, to re-examine and formulate a more organised and holistic SABDA blueprint action plan based on the potential KPIs of projects, programmes and initiatives that meet the local economic capacity and strengths.

For project 02003, Traditional Village Economic Development RM2.5 million, the Honourable Member for Sungai Panjang and Permatang raised matters relating to the Traditional Village Economic Development allocation. For information, Traditional Village Economic Development will receive an additional allocation of 25%, namely RM2.5 million for next year, compared with RM2 million for 2025. For this allocation, there are three planned priority initiatives and projects, which are social development and community building, branding and cultural promotion of the village, and strengthening village leadership.

The allocation will be used to improve the quality of life and community bonds of villagers through the implementation of community programmes such as the Village Beautification Programme, the Culture and Public Sports Programme, Village Identity Branding, Empowerment of JPKK Leadership, and appreciation for Traditional Villages and Village Head Icons. In addition, as a supplement, specifically for the skills and leadership development of the village and personality development for JPKK. JPKK Chairpersons are also trained in meditation skills and toward certification as a community model under the National Unity and Integration Department, which will make JPKK Chairpersons peacemakers or intermediaries in helping to resolve minor problems and disputes at the grassroots or in their respective kampungs without having to be brought to the authorities or court processes.

Next, to improve the Rural and Village Development Plan of the State of Selangor, the State Government will consider implementing a Mid-Term Review of the PSP Village Strategic Direction Plan 2035 by the Department of Town and Rural Planning of the State of Selangor under PLANMalaysia Selangor. This Mid-Term Review will update the latest information based on the Selangor Kampung Profile Update and Matching Study 2025 and the one just completed, and will take into account major and latest changes to prepare future-proof kampungs that respond to current challenges and opportunities.

For Project Code 02005, Basic Rural Public Amenities, RM1 million, the Honourable Member for Sungai Panjang also touched on the Basic Rural Public Amenities allocation. For the information of the House, the allocation under this project code is specifically for works such as maintenance, upgrading and improvement of the rehabilitation of public amenities and social facilities, as well as village halls and sports facilities such as futsal courts, digital infrastructure namely the provision of free broadband coverage, selected village halls or community centres, and the addition of SMART Village Centres as one-stop centres for use by villagers of all ages to access free broadband services, internet centres, extra classes and community centres.

For the use of this allocation, as with the use of the District and Land Office allocation, applications will be submitted to the Allocation and Development (AP) Section of the State Economic Planning Unit (UPEN), which will be decided according to current needs and priorities. That concludes my winding-up, and I thank everyone who debated this afternoon. Thank you, Mr Speaker.

Speaker

Seri Setia...

Tuan Dr. Mohammad Fahmi NgahPKR · PHSeri SetiaEN

Thank you, Mr Speaker. Thank you to the Honourable Members who asked about issues under the Development Expenditure Estimates, Vote P14, Selangor Islamic Religious Department (JAIS). I will begin with the Honourable Member for Meru, who asked whether the allocation for surau can be increased to an amount exceeding RM500 thousand. I am sure that, as an ADUN, the Honourable Member has allocations that can be given to those surau. However, if there are urgent needs from surau under the Honourable Member's area that require some priority for spending this RM500 thousand, or from the funds available in the State, such as TIJARI, applications are welcome to be forwarded to my office.

Secondly, the Honourable Member for Seri Serdang expressed concern about the construction of the Puchong Utama Religious Primary School. This school, Honourable Member, like other schools, will begin in the Budget Book with RM10, but once it is in the Budget Book it will be retained, and there will be a year in which a million-ringgit figure will be placed for the construction of the school. For information, at this moment, the cost of the school has not yet been finalised by the Public Works Department (JKR), so that assessment must take place first before we determine the expenditure required for the construction of the school.

As for the Taman Lestari Putra Puchong Mosque, which, like the Religious Primary School just now, for many years had RM10 but this year has RM1 million. JAIS has given an assurance that the preliminary works and site entry will begin next year. So far, this mosque will be developed using a 10, 40, 50 formula, which are the percentages to be funded by the relevant parties. 50% will be proposed to be obtained from the Implementation Coordination Unit (ICU), 40% will be funded by the State Government

and 10% by the Kariah. So the estimated value of the mosque is RM20 million, the Kariah's share is already about RM2 million, the State Government has committed RM1 million this year, and we will place further commitment at RM8 million next year, and JAIS is also in the process of applying to the ICU for that additional 50%. At present I do not think there is a problem with Friday prayers in the area, because it is reported that there are seven surau, and of those seven surau, four Friday prayer surau are already operating in the surrounding area, but God willing the mosque will begin next year.

The Honourable Member for Kota Damansara expressed concern about the Kota Damansara 2 Mosque. What is its status? The Budget Book states that next year's allocation has been set at RM1.35 million, and in fact the State Government has already set aside a total of RM5 million. So if we follow the 50% formula from the ICU just now, part of that 50% will be applied for from the ICU, and preliminary works have indeed begun, Honourable Member, but now it is slightly delayed because of land gazettement issues. The mosque happens to be on land gazetted as a graveyard, so we have to gazette half for the graveyard and half for the mosque, so to speak. Hopefully the person who asked the Honourable Member will still be around to see the mosque, and not end up in the graveyard.

Alright, the Honourable Member for Sungai Burong asked a question about the Religious School Planning. Actually, an arrangement is being planned to be carried out next year. Because at this moment, I think the method used by JAIS is a method for determining which schools should be done first and the planning section for new schools. I am not sure whether its basis can still be used, so that suitability will be studied next year, and the funds for that study will be made through the funds provided under the Key Work Target 2026 under the Standing Committee on Islamic Religious Affairs. Its budget can be referred to in P01 under the Office of the Menteri Besar and State Secretary, under head PK404011 Islamic Religious Affairs, which amounts to RM500 thousand and has been provided for. Thank you.

SpeakerEN

Okay, Tanjung Sepat.

Datuk Borhan Bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Mr Chairman. To answer the questions and the debate raised by the Honourable Member for Subang Jaya, regarding strata titles for the Pangsapuri Indah Vila application. We have received this one, and it is in the process of resolution, and we see that there may be some more documents required. And next, for Pangsapuri Spektrum, we have only just received this one, and it is under review, and if there are any further deficiencies we will inform the Honourable Member so that any documents can be obtained to complete it.

The next matter from the Honourable Member for Bukit Gasing, which has three points. The first point is actually about these Senior Citizens' Homes. We do not have any plans for this at the moment, but nevertheless it is a good proposal for the future, because we see that in Malaysia or in Selangor the senior citizen population has increased greatly, not at 65 to 75 years and so on. This need is real, and it may involve several agencies that we need to discuss and ensure that its implementation receives cooperation from all parties.

And next, regarding maintenance assistance for these low-cost flats, which the Honourable Member also mentioned and asked about previously, a study has been carried out. If the whole matter involves about RM65 million a year, but nevertheless we may be able to do it in stages, and this needs to be refined. If we can get special assistance from the State Government, or we can discuss with the Ministry of Housing and Local Government (KPKT), subsidies can be given. I think this is very necessary, because we see that the maintenance of these low-cost houses is getting worse and worse. If there is no action or any new ideas, the condition of the houses and so on may get even worse.

And next, regarding the study of houses for RM1 billion. Actually, at the government level we have Transit Oriented Development (TOD) housing, but these are in TOD areas where the costs are quite high and may not be affordable to ordinary people. Can this be done for the urban fringe or in semi-urban areas? For example, LPHS. We are now in the process of applying for land on the urban fringe or in areas in the districts of Kuala Langat and Sepang to build PPR flats and so on. In this way we can help a little for the B40 community, and we are currently building 200 units in Dengkil under the KPKT grant, and recently we obtained another 10 acres of land in Kuala Langat at Sungai Buaya, and we also plan to build affordable houses or PPR flats to ensure that these groups can rent homes at more comfortable rates.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

May I ask. I welcome any new land for special development, but for the time being, the existing PPR flats, which are usually rented to one tenant. If couples without children or single persons are rented one room. So from one existing PPR unit, it can be rented to three people who benefit from one unit. Just like the Smart Sewa Scheme, where RM600 can be rented as RM200, RM200, RM200, and it can benefit three elderly couples without children.

Datuk Borhan Bin Aman ShahPKR · PHTanjong SepatEN

Thank you, the Honourable Member for Bukit Gasing. That is a good proposal, but we need to consider how its mechanism would work.

The mechanism is that in one house there are three different people living, perhaps due to differences in race or perhaps due to a person's position, so suitability needs to be studied. But it is a good proposal because it can save, as the Bukit Gasing member said, one house where only two people live while there are three bedrooms. So we may face problems in terms of the kitchen and how sharing would work and so on. This we can do, so that is all I can say for the two ADNs, or the Honourable Members who have discussed it. Thank you.

SpeakerEN

Kinrara first or Taman Templer? Kinrara? Taman Templer, yes.

Puan Anfaal Binti SaariAMANAH · PHTaman TemplerEN

Thank you to all Honourable Members for the debate. I would like to add a little to the questions raised by Honourable Bukit Gasing regarding senior citizens' homes, even though they have already been answered by the EXCO for Housing. At the level of the Standing Committee on Care Economy or Ekonomi Penjagaan, we are studying the aging in place module, or penuaan setempat, for senior citizens who are still healthy and productive. This is an integrated combination of the concept of the Senior Citizens' Activity Centre (PAWE) and also the assisting revision of aids that can be used and adopted by the family members of these senior citizens, so that they do not need to go to an institution or a specific house but instead make greater use of existing homes and live together with their families. So that is an addition to the question raised by Bukit Gasing.

Regarding the debate put forward by Honourable Permatang on the Skim Mesra Usia Emas. For information, we have indeed closed new registrations as of 1 December 2024, because the number of existing registrations in 2024 was 450 thousand, and as we are conducting a study on senior citizens that has been completed, new applications will be reopened. The State Government intends to reopen new registrations in 2026, subject to the decision of the MMKN, on what the final date will be.

Regarding digitalisation, we found through a study that senior citizens face digital literacy issues, which limit their access to assistance, and from the researchers' study that the assistance may be missing its targets due to access to digitalisation. Therefore, we need to combine the two in a hybrid manner. First, through the application or website, and we will also retain the existing mechanisms depending on the needs in the locality or the demographics of each DUN. Between the RM49 million budget stated in this Budget Book and the figure stated by Dato' Menteri Besar, this RM50 million will also be decided at the upcoming SKU Meeting and the upcoming MMKN, but we very much welcome the amount of RM55 million, taking into account the annual amount used and utilised for disbursing assistance.

The Skim Mesra RM150 voucher reaches RM52 million every year, although in the 2025 Budget it is only RM40 million.

So that amount will be finalised at the Key Performance Target Meeting and decided at the upcoming MMKN. Okay, next, I would like to touch on the matter raised by Honourable Subang Jaya, regarding material changes, or this refers to news about several childcare operations that have begun closing due to cost and so on. We understand that if we impose conditions that are too strict, this will place pressure on operators. Therefore, at the level of the Standing Committee, we will review several procedures at the Local Authority (PBT) level to facilitate operators. So, after almost a year of operation, the proposals from the Committee on improving care services include, among others, proposing that applications for registration to obtain planning permission should not need to go through the One Stop Centre (OSC), and that development plans and equivalent plans be endorsed or approved, and certified valid by the PBT, without requiring registered consultants. This is because registered consultants, whether architects or others, want to charge fairly high costs of around RM10 thousand to RM20 thousand. So I welcome the proposal from Subang Jaya that we ensure this mechanism, so that these operators continue to register, while at the same time not applying pressure to the point of binding them and causing many operators to close their operations. That is all.

Speaker

Kinrara.

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, Mr Speaker. I would like to respond to the matters raised by Honourable Sungai Burong. The IDRISS Development Project is a large-scale property development project developed by landowners themselves or by the private sector. The implementation of projects under the IDRISS development is based on the planning of the developers themselves. The State Government's role is only to assist developers so that proposed development projects can be implemented according to their plans. Basically, IDRISS development involves proposed development in several sectors such as the services industry, high-technology agriculture, tourism and housing, where the development focus in IDRISS is not confined only to industrial development. IDRISS development can be implemented in a balanced manner through several approaches, such as the empowerment of traditional villages through upgrading local basic infrastructure for shared facilities. The opening of new economic resources through offering local employment and business opportunities. And also the increase of income through offering skills training programmes and TVET to provide a skilled workforce.

And I would also like to answer the question raised by Honourable Bukit Gasing. Among the efforts implemented by the State Government to improve the state's export performance are international expos, such as sales exemptions for overseas trade missions, and training and guidance programmes for exploring export markets through cooperation with MATRADE. I would also like to share some statistics on the trade performance of the State of Selangor for January to August 2025. In terms of Selangor's ranking and contribution to the country for trade, Selangor's position is first, contributing 31.2% with a value of RM250 billion. And for exports, the position is third, a contribution of 24.2% and its value is RM366.47 billion. For imports, too, the ranking is first, contributing 38.8%, and the total value is RM616.5 billion.

And Honourable Bukit Gasing also touched briefly on LRT services. I am pleased to inform you that the State Government has taken note of and welcomes the suggestion of Honourable Bukit Gasing that the 2026 expenditure focus on expanding LRT services in rural areas. This approach is seen as in line with the objective of strengthening the public transport network for communities that are less served by existing services, in an effort by the State Government towards improving more inclusive mobility access. Priority to rural areas also has the potential to reduce dependence on private vehicles and support socio-economic development agendas, as well as through improved connectivity between major growth centres. However, holistic considerations need to be taken into account, especially in terms of the level of demand, population distribution, and the higher operating costs in low-population areas. The State Government will review the projected needs of the most efficient operating model, as well as the potential for restructuring service coverage, so that financial resources can be distributed optimally without jeopardising the continuity of LRT operations in urban areas with high demand. This detailed study will ensure that the 2026 expenditure can be implemented in a balanced, impactful manner and can provide maximum benefit to all the people of the State of Selangor. That is all, thank you.

SpeakerEN

Yes, Bandar Utama.

Puan Jamaliah Binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Mr Speaker. Mr Speaker and Honourable Members, I would like to record my thanks to everyone who has given their views. I would like to begin this session by answering the question raised by Honourable Kota Damansara regarding the activity of photographing various species of birds, which was prevented by forest rangers. Here I am answering more about what the guidelines are, and afterwards, if there are any improvements from the tourism aspect, that can perhaps be discussed later by the tourism portfolio. For information, the Hutan Simpan Kota Damansara is only permitted for hiking activities at present, with a fee of RM2.00 only per entry. However, recently there have indeed been many individuals who enter for the purpose of taking photographs. The Selangor State Forestry Department has no objection to individuals entering the Kota Damansara forest for the purpose of taking photographs, but they must comply with the rules of the Selangor State forest. If photographs are taken merely for personal storage, it's ok, there is no charge or fee, but for commercial purposes, the parties involved must pay a commercial photography fee at the rate of RM100.00 a day, and if it is for filming purposes, a fee of RM500.00 a day is charged. So that is the feedback from the Selangor State Forestry Department.

And apart from that, Honourable Seri Kembangan has raised the issue of allocations, which had also been raised previously, and as has been informed, under the development allocation there are still additional sources of funds that can be used to organise programmes, for example the Plastic Bag Charge Collection Fund, Ecological Fiscal Transfer or EFT, and apart from that, the Climate Change Adaptation Centre is also actively seeking or exploring opportunities to obtain grants from the Federal Government or grants from international sources.

However, I would like to thank Honourable Seri Kembangan for raising this matter, where I feel we also need to continue to take the opportunity to make improvements so that in future, if the Plastic Bag Charge Collection Fund, for example, runs out, because we are targeting reduced use of plastic bags. So if one day this fund no longer has allocations as it did before, we will need to find additional allocations for the next environmental programmes. The question from Honourable Permatang asked why the Women's Health Scheme seems to have no figure under the 2026 Budget code. For Honourable Member's information, the implementation of the benefits of the Women's Health Scheme for mammogram screening remains under the Selangor Kanser programme. This is more of a technicality, because the Women's Health Scheme is actually for the mammogram programme, where after discussion, we found that coordination for this programme is more efficient if we park it under Selangor Saring screening, where we have cancer screening that involves mammograms. So in fact that allocation has only been directed to one combined Vote, but the Women's Health Scheme still exists and its purpose is for mammograms. So that is a little explanation for Honourable Permatang. So that is all the questions that were asked, and I would like to thank everyone who asked questions.

Speaker

Ya Banting.

Tuan Papparaidu A/L VeramanDAP · PHBantingEN

Thank you, Honourable Mr Speaker. I was asked by Honourable Meru about the area of Kapar where there are increasing numbers of Hindu residents but no crematorium, meaning that he requested a crematorium in the Meru area. I understand that there are indeed Hindu communities in the Meru area, at 24.5%, namely a total of 16,400,97 voters, and there may be even more who live there, because they have migrated from the Kapar area or the northern area from Kuala Selangor and so on. I very much welcome what Honourable Meru has raised, but at present we are indeed planning to build a crematorium, and this time it is in the Kuala Selangor area, amounting to RM1 million that we will channel to the Local Authority (PBT) in Kuala Selangor, and where the balance we will also look for from anywhere, whether from the State Government or the PBT, to build a crematorium in the Kuala Selangor area first. This is because, given my experience as ADN Banting in the Kuala Langat area, building one crematorium costs about RM4.5 million, which is a high cost. So, I do not deny that the need is indeed there, so I will discuss again with the PBT and the State Government to obtain assistance or financial support, whether from the Federal level and so on, to build a more efficient crematorium that is also more suitable for the Meru area. I also see potential in the Meru areas because many plots have been identified as Hindu burial grounds, and I am also discussing with Sime Darby, which must hand over to the State Government more than 4 acres in the Jalan Meru area. That is burial or cremation land for the Hindu community who worked on the estates in former times, so I will work to get that land back for the State Government so that we can build a crematorium that is more beautiful and more suitable for all parties.

Secondly, I would like to touch briefly on Seri Serdang, who has requested assistance with laptops for students at public higher education institutions (IPTA) and private higher education institutions (IPTS). I think under my portfolio, specifically, I have targeted only the Indian community. I think I will also take note of this matter, and indeed among the B40 there are far too many Indian students who cannot afford laptops at whatever semester they enter university or other institutions of higher learning and so on. Now they need laptops, and by the time of SPM and Form 4 they have already been using them. So I am reviewing the budget that has been allocated to me, which is RM1.5 million for higher education for the Indian community. I may divide it a little for assistance with higher education fees and also for the purchase of laptops. But I, thank you to Honourable Seri Serdang for bringing this matter into this esteemed House, that is all, thank you.

Speaker

Ya Sekinchan.

Dato' Ng Suee LimDAP · PHSekinchanEN

Yes, thank you, Mr Speaker. Thank you to the Honourable Members who took part in the debate on the Development Motion.

I would like to respond to the Honourable Member for Seri Serdang regarding the issue of poorly managed rubbish in the Traditional Villages, which lack roro bins and the like. This matter will be examined so that it can be addressed as well as possible, because the problems of rubbish in these villages are somewhat constrained. Sometimes there are issues with KDEB, which largely falls under the PBT. So we will focus on what we can resolve, and we will try to tackle it, for the information of the Honourable Member for Seri Serdang. Ijok also raised a little on the issue of rubbish and so on. We, the State Government, indeed take the issue of rubbish and illegal dumping seriously, along with open burning here and there, and encroachment; there are many matters that arise. But we will focus one by one, where we will take firm and strict action, including working with the Kuala Selangor District and Land Office to issue Form 7A and so on to owners who defy the rules and continue to allow their land to be used as rubbish dumps and so on. If they still fail to comply, the land will be seized; we will try to do the best, and this is for Ijok's information.

Next, my response to the Honourable Member for Kajang regarding the use of the issue of the RKK, the Special Area Plan. The RKK is used as a detailed planning document to ensure development of the areas is carried out in an orderly manner for 4 data-based areas. For the Kajang area, several projects are being identified, including improvements to the pedestrian network, activation of focal areas and redevelopment of areas with potential. The special area plan is not only focused on existing special tourism but covers overall urban development, including restoration of historical areas, public facilities and tourist attractions. We want to ensure that Kajang is not left behind in terms of development planning from various aspects. Thank you to the Honourable Member for Kajang.

Next, I respond to the Honourable Member for Bukit Gasing, who touched on several important matters relating to cooperation with AirAsia in the context of the tourism issue. The State Government is continuing the strategic cooperation with AirAsia in promoting tourism, including digital campaigns and special offers at destinations in Selangor State, and AirAsia has also helped promote the Selangor Tourism Year, which is Selangor Year 2025, through displays on their media platforms and cross-marketing collaboration between us and AirAsia, which are among the cooperation we have established. We hope that in the future the cooperation will be closer so that we can optimise this cooperation to achieve the greatest impact, stimulating the tourism sector industry in Selangor State. Next, regarding the promotion of these urban programmes, how there are their own attractions in the city, especially Bandar Raya Petaling Jaya. Bandar Raya Petaling Jaya is among the cities that, although old, has the longest-standing uniqueness of its own, including Sungai Way, which also has a museum; Kampung Baru can also be made a new tourism product, included in the Selangor State Tourism promotion so that many people come to Sungai Way, not only staying in the hotels in the surrounding area,

but they can come there to explore the history of the development of Kampung Baru and visit these museums, for the benefit of the villagers there, and we want to attract more people, young people, to come to our Kampung Baru.

Next, the issue relating to the State Government together with the PBT is implementing city promotion such as arts and culture, which I emphasised earlier: heritage trail, food trail, night economy and community activities. This is also what we emphasise: this programme aims to enhance the identity of the Petaling Jaya City Council and other cities, and to boost the local economy through attracting visitors and tourists. At the same time, PJ has an attraction apart from its history and heritage, and some of its arts; where do many tourists stop in PJ? At SS2, at DKing Durian. Among the famous durians, people come to PJ and can go to DKing SS2. We also have a lot of cooperation with Tourism Selangor; we have festivals, durian-eating competitions, beauty queen contests and so on, linked to this durian fruit, and this durian is a very strong attraction for international tourists, especially from Hong Kong, from China, and from the surrounding areas, who are very fond of the king of fruits of Malaysia. So we must make the most of it to attract tourism. Next, in the context of promoting urban residents, we also propose, as in Bandar Raya Petaling Jaya, a segment of shopping malls or MICE, meetings, conferences and exhibitions. This segment can be developed as many professional and corporate companies plan to hold retreats or conduct SKT studies and so on, and they can come to where? To the cities of Petaling Jaya, Subang Jaya, Shah Alam, in the cities, to rent hotels and hold their meetings. This too is a tourist attraction for the cities. So we want to ensure close cooperation with MICE. CEB, which is Malaysia's Exhibition Bureau, we will cooperate with them. They have an initiative, there is some incentive given to organisers who can organise 1,000, 2,000, 3,000 people coming to convention anywhere in the destination and in the hotels; we focus this MICE segment in the big cities. I hope for the cooperation of the Honourable Members, input and so on; we will consider it properly so that the Selangor tourism sector becomes a sector that encourages the economy for Selangor State, making Surprising Selangor, which is Selangor Year 2025, achieve the target of 8 million tourists by the end of the year. Next year we will extend it, which is Malaysia 2026, with which is Selangor Year 2026. There is no need to go far, Selangor is here, (foreign language) Selangor Penuh Kejutan. That is all, thank you, Mr Speaker.

SpeakerEN

Yes, Kota Anggerik.

Tuan Mohd Najwan Bin HalimiPKR · PHKota AnggerikEN

Alright, thank you, Mr Speaker. Briefly, only 2 matters I wish to raise. First, what was raised by the Honourable Member for Kampung Tungku regarding the need for rugby to have its own home ground, especially a cow grass turf field that meets the standards of the sport.

I would like to inform that the State Government indeed intends to help core sports to have their own respective home grounds. However, there are several constraints that need to be carefully considered before such a facility can be provided. Among the main challenges is the shortage of suitable land or limitations in the Klang Valley, and the fairly high maintenance cost of a field if it is dedicated to only one type of sport. Therefore, the State Government's approach at this time is for us to cooperate with the PBT in providing sports facilities that can be utilised for training and competition according to the needs of each sport, and at the same time the State Government is also always ready to help any sports association that requires access to facilities under the administration of the PBT. In the future, the State Government will explore areas with potential to be made sports facility sites in order to meet the demands of sports associations in a more comprehensive and strategic manner.

Second, what was raised by Permatang regarding the proposal that State athletes be given the opportunity to take part in the Selangor Programme For Inspiring Ready And Knowledgeable Talent, SPAK. We have no obstacles and in fact very welcome the participation of athletes in this industrial training programme, to give them professional exposure and additional skills outside the sporting arena. For the purpose of matching industrial training placements, athletes may contact the Selangor State Sports Council directly, which will manage and coordinate their participation in this SPAK Programme later according to field suitability and placement vacancies. The second matter raised by Permatang concerns the development of bowling on grass in the Kuala Selangor District. The State Government has taken note of this issue, and the Kuala Selangor District has in fact long been a very active location for training our lawn bowls athletes, and it cannot be denied that many State-level and international athletes have also emerged from schools and clubs in the Kuala Selangor area. For everyone's information, the Kuala Selangor District does have a lawn bowls facility, but the facility has suffered damage and can no longer be used. Accordingly, the State Government is prepared to discuss with the Local Authority to re-examine the need to develop a lawn bowls facility in Kuala Selangor, as I have informed, as stated by Permatang. This study will cover various aspects: site suitability, development cost, the level of community demand, and the potential use of the facility for the development of reserve athletes. The State Government is committed to ensuring that lawn bowls receives appropriate support in areas that have proven active in producing sporting talent at State level. Thank you, Mr Speaker.

SpeakerEN

Yes, Pandan Indah.

Dato' Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

Thank you, Mr Speaker. Honourable Members, I also thank all the Honourable Members who asked several questions relating to the issues of floods and roads, and there was one question from Kampung Tunku regarding the Veterinary Department. Who was that just now? From Seri Kembangan, who asked about the issue of stray dogs and also cats. If I may, for the information of the Honourable Members, much of it I have already touched on in relation to the issues of the Flood Mooring Project and also the issues relating to roads. But I want to say generally that if we look under PK1, under Development P13, which is the Irrigation and Drainage Department, if you may refer there, if we look closely at these projects, let me give an example, 01301, which was raised by Kota Damansara, namely, if we mention there 01301, the Flood Mooring Project, for example at Kampung Melayu Subang, at the Sungai Pelempas extension near the end there, for under 26 it is stated RM10.00, which means this project is finished. This is in the process of being finalised. If it has an extension, it means that, say, RM10.00 is for finalisation, so that is the guide. So if we look back there too, if there is a reason, these development projects that use this development allocation do have specific project names. So we cannot, other projects, their projects are either the earlier ones or the later ones. So if we refer here, for example 01302, this is the Kampung Melayu Subang Flood Mooring Project, Sungai Pelempas Phase 2, the allocation this year is RM1 million, meaning that preliminary work has already started. Preliminary work has started. And for others, for example under 01312, the Anak Sungai Damansara Flood Mooring Project Phase 2 is RM15 million, but this RM10.00 has no extension, meaning this project has not yet started, whether it has been delayed further, perhaps in the negotiation process. If it is negotiation, then the appointment of negotiators or consultants, we see 01001, 010100, all these consultants are placed there, which we will make many consultant appointments for next year, which at the early stage are not in the project but are in 01101001, design, survey and soil investigation studies; that is where we start. So that is the guide in how we see at what stage the projects are.

So I say all this to make it understood that the projects that have been mentioned by the Honourable Members, all these projects, whether from Seri Serdang, Ijok, Paya Jaras, Kota Damansara, Batu Tiga, Sungai Burong, Sungai Panjang, are all in this list. If not in two places, one other project under the Federal flood mooring project, Federal allocation, is not in this. The other one under Caruman Parit, most of which we handle, which I did, which I went down to, and also some that are under the medium term or the quick win, using the Caruman Parit allocation, which is also not in this. So that is why, do not have any worries; we will look at and examine it, and if it is not in the annual list, it is in another place, so that we can ensure that issues relating to flood mooring or flood management proceed well. But we must remember in today's circumstances, we see this is an extraordinary phenomenon. When we design, I have said, it has its ARI; if it exceeds

the ARI, there is no system that can control the flood. What happens, the phenomenon we see happening in one or two days, that is among them, but we can mitigate, minimise the impact. Regarding the question from Sungai Panjang relating to road B44, so B44 is actually in several phases of detailed design involving upgrading, including the junction, the only problem being that if the proposal for an emergency route, we will consider it based on the existing road reserve. If it involves acquisition, it will become another issue. And what was raised by Paya Jaras relating to this bridge, I have also answered this morning, relating to the bridge that collapsed this morning, the Honourable Member has also been answered. And this is actually the Kubu Gajah Road and Kubu Gajah 16, which I have mentioned earlier, and the Tengku Ampuan Bridge is a bridge that has already entered the upgrading process, and the consultant tender will be completed in March 2026 for consultants, for negotiation first, consultancy first, after which they design the bridge and it is implemented. As for the Veterinary Department, as the Honourable Member for Seri Kembangan said, the last one is that if it is followed in terms of...

Tuan Preakas A/L SampunathanDAP · PHKota KemuningEN

Honourable Member for Kota Kemuning, before you go to the veterinary issues, regarding the Federal projects that you touched on, I want to state that, are you monitoring these works? Because today at Sri Muda it caused Desa Kemuning to flood, given the delay in obtaining permission to enter the LLM area. So I also ask whether the Honourable EXCO is monitoring these works.

Dato' Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

Indeed, the Flood Mooring Plan Projects involving Federal allocations are monitored together by the Irrigation and Drainage Department (JPS) Selangor, in cooperation with JPS Malaysia, and we do monitor them, and as I said, if other agencies are involved, sometimes there are some issues of delay in obtaining permission and so on, especially if highways are involved. I am informed that so far permission has indeed been obtained, but the process for us to implement it takes some time. So I, we will continue to monitor the Federal projects, because flood projects, as I have said many times, cannot be viewed separately, whether State projects, Federal projects, or under Caruman Parit; everything is viewed holistically, and implementation is monitored, and I will ensure this happens. As for the Veterinary Services Department, we must understand that management of stray dogs, or stray chickens, or stray cats, is actually under the Local Authority; I do not, the Veterinary Services Department only handles issues if they relate to disease. If there is disease, and so on, yes, but cows, buffaloes, pigs and chickens too, the chickens are under what's the name, the management of the Forestry Department and Perhilitan. However, our efforts to control stray dogs, especially stray cats, are not very serious. Stray dogs are a problem we are facing, which is problematic, including monkeys, yes, that is under Perhilitan, so it needs to be managed, and I hope

that going forward we have better methods of how we manage all this wildlife. Thank you.

SpeakerEN

Yes, Dato' Menteri Besar?

Tuan Shafie Bin NgahPAS · PNSungai RamalEN

Mr Speaker, Standing Orders. Speaker, before the Most Honourable Member provides his explanation, I want to draw the Speaker's attention to 24(8) regarding answers to Questions, which should have been given in the first week to Members of the House, but until today the answers given to all of us are not complete. I seek the Speaker's firm direction to ensure that the answers are also given today. Thank you.

SpeakerEN

All answers should have been given on the last day of our House sitting. So since today is the last day, they should be supplied today. I would also like to tell all the State Assemblymen that if there are any, especially Written Questions, that still have not received answers, in the first week of the Sitting, if you still have not received them after this date, you may submit a letter to me so that it can be investigated in the Committee on Rights and Freedoms. That is all; next, I invite the YAB Dato' Menteri Besar?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Members, for your debate on the State Development Allocation of Selangor, to complete our debate throughout this 2026 Budget. For the information of the Honourable Members, there are several matters that were raised in this debate session on the motion.

The first thing I want to refer to is Bukit Gasing, concerning the allocations that fall under Miscellaneous (Pelbagai). These allocations are part of several decisions taken by the State Government when this budget allocation was made. How is the budget allocation made? The budget allocation is usually made around the 6th month. Every year we gather all proposals from the various Departments and so on. Thus, at some times, from the 6th month to the 9th or 10th month, we also issue several new plans for State Government programmes. Among the new plans that may not be included at the early stage are, for example, scholarships or a 50% subsidy assistance for those who need it. We add another RM5 million, for example, to help the poor (fakir miskin) whom we want to bring out or want to help so that they do not fall. 1,351 people. Among the new matters is when we heard a briefing regarding Hay Resort and areas in the Sabak Bernam area. The State Government wishes to allocate RM5 million to develop Hay Resort so that it is able to increase Hay Resort's capacity during the development. So its value is not small, sometimes reaching RM17 million, with an addition of RM5 million and so on. I can give the overall data later because it involves several matters that we have put forward, and among those matters is the Integrated Circuit IC Design Park. This is our commitment of RM5 million every year, which will actually begin next year. Last year we already started for a one-shot programme, but we need to make a commitment, and after this the allocation for the IC Design Park will be implemented. We also look at, for example, Kampung Indian Settlement Gombak. This is an issue that was raised. This is a solution we have long wanted to make. The cost of the road keeps increasing every year, and we have recorded it until now. The record has now reached 10 million, and we will implement it.

Among the budgets that we also put forward here is a programme, for example, the Maintenance of Unowned Drains (Penyelenggaraan Parit Tidak Bertuan) amounting to RM5 million. This has also not yet been included in a specific allocation because we are waiting for the data, and also the Lembah Subang People's Housing Project (Projek Perumahan Rakyat Lembah Subang) amounting to RM2 million. For example, yes, because at the 6th month, 7th month, until the 8th month and 9th month, when the allocation was made, we set aside a portion for this Miscellaneous to fill those needs. It is a matter of our capacity. In fact, the allocation is plentiful, so what we get we lock in as one number and the rest we add. That is why the value of Miscellaneous is quite high.

There is also an allocation for the preparation of SUKMA amounting to RM25 million. This is not something we often have to do. The Islamic Religious Council (MAIS), for example, RM10 million, which we put forward. These are applications that came after the budget listing that began in the 6th and 7th months. That is why these figures were included in Miscellaneous, because we had not yet cleared where to put them, so that the allocations could proceed. Some of these allocations need time to take off or to be implemented in full. There are details that I will present later. For example, the 2026 Budget Speech of the Menteri Besar. I was given, to allocate, for 50 million, so I can add to the allocation for LIMAS, for example, yes. We add for education allocations, for example, people's tuition or book vouchers. Book vouchers were previously for 4 thousand people; we increased them to 10 thousand recipients. These are among the matters and exercises so that we can introduce new programmes, in addition to implementing the Budget Dialogue that usually takes place in the 8th and 9th months. We can add new programmes that arise from those activities and programmes. Among them is the Selangor Penyayang Project, for example. An allocation of around RM14 million for next year, which we will channel down to the grassroots level. There is also a discussion with His Royal Highness the Raja Muda. The State Government wishes to make a commitment that whenever Tuanku goes down, we also help identify a locality that can be assisted with activities, maintenance, repairs, and also upgrading of several facilities. How much is its value? Roughly RM4.5 million. So all these values are included in Miscellaneous for several factors. The first is the new programmes that we want to introduce.

Programmes that do not yet have a vote or specific heads for us to put forward. From time to time, for example, the IC Design Park. From next year onward, every year we will allocate RM5 million for 5 years or for 10 years, because we need to allocate RM60 million. So we will put it under its head later, but for now it does not yet exist, and it is directly included in Miscellaneous so that the State Government can put it forward. There is a new allocation for the Orang Asli, for example 200 thousand, arising from applications by certain parties. So this Miscellaneous is not that we do not plan or do not prepare. Rather, it consists of the new programmes I mentioned, which do not yet have a specific head or vote. The third is that there are several advantages at the Office of the Menteri Besar that we can determine when drafting the Budget Speech, so that our Budget is more attractive and can also reach those who need it.

Honourable Members whom I love, I heard earlier from Meru mentioning university entry assistance. Next year, from the regular allocation, it is RM3 million, but next year we will increase it to RM5 million. Where does the RM5 million come from, Honourable Member? From Miscellaneous just now. Actually, from the beginning we had not included it, but we will increase it by RM5 million and put it there. Later we add to it for what, to add to the applications. Why do we add to those applications? Because the applications this year amount to 7 thousand people, and we are only increasing from 7 thousand, only 3 thousand, which we can raise to 5 thousand people, and the value is RM5 million. This is not new. In fact, in the previous years, namely in 2018 and 2019, the value was indeed RM5 million, but previously we had to restructure because we increased the allocation for PTRS. Now PTRS has contributions from MBI and so on. We are still able to maintain PTRS for 150 thousand people plus their lunch, and it is added to assistance for those who have not yet mastered the 3M skills. These are among the matters that happen in the dynamics of our drafting and planning of the budget. Regarding the point raised by Meru, who said why we were rather slow, this is because under the previous procedure, the university entry gift was for those who enter university. The offer from the university does not yet confirm that a person has entered university. They must enter a registered university and be followed by an application with us, because if not, they receive their forms, they receive their offers, and they do not take them up. So they get that RM1 thousand, but that RM1 thousand in the end does not help them at the university. Although this is rather late, I think it still reduces the family's burden, especially ensuring the living expenses for the first 3 months or first 2 months for the family, or for the students, the undergraduates, who study at the university to support their living at certain times. I understand that if there is a mechanism that can confirm their entry, we can give it immediately. That is why it is among the procedures checked by the audit and so on: we cannot give it before they enter. If they enter, then we can give it, if we do not give it.

If we give it early, what if they do not enter? The money is not a gift for entering university but a gift for an offer at the university. Hey, it does not become like that.

Honourable Member, regarding PPAS or public libraries, I welcome the applications from many parties earlier. I think Permatang raised the matter of the Tanjung Karang library. In this Budget book it is clear that next year we allocate RM2.5 million to complete the Tanjung Karang Public Library. Why was there a delay? Because there were several factors. One of the factors was the failure of the contractor, and the second is that we had to replace him after he was granted an extension of time and so on. After that we were hit by a pandemic for 2 years, from 2020 to 2021. So for that reason alone, we spent 4 to 5 years to complete the reconstruction or finish the alterations or full maintenance of the Tanjung Karang Public Library, which I think can be completed next year, in 2026, if everything goes well, orderly and neatly. Regarding the library in the mall raised by the Honourable Member for Bukit Gasing as well, I fully understand because he was also involved with me when I was at the library and when I was Chairman of the State Public Library. We found that there are certain reasons even though the demand at that library is very high. Insya Allah, we will review again the allocation for this library, where we want to find a suitable site in Bukit Gasing. If we get it from a Council building, for example, which does not involve high costs, but the library side must make and maintain several concepts. The concept is so that these libraries can be developed comfortably and become part of our transit practice in several places. PPR Kota Damansara, for example, is a good practice, and its cost is not big. I think the cost was around RM400, RM1,000, RM300 to RM400 thousand, and it was actually contributed by MBI, which provided the site. And after we upgraded it, Honourable Member, we also need to ensure that its maintenance is good.

I heard this morning, I did not have time to wind up, but it was summarised, concerning the facilities that exist. We have several facilities that are actually the result of cooperation with outside parties, among them UiTM, or private companies and so on. That is why we have to impose certain costs, because they also involve costs that have not yet been paid or determined by the State Government, and it becomes an indirect attraction at the library. However, we may be able to prepare a fund like waqf and so on, which can be established and practised in the future, so that the facilities at the public library can be used much more cheaply, or can be used much more affordably by families, or more reasonably for the families involved. For next year, for example, we will identify several more PPR, because the Kota Damansara concept is very good. Before that, we had actually built such a library at Kampung Lindungan, but only in a cabin. But at Kota Damansara it is very attractive because it uses part of the PPR compound, and that compound indirectly becomes a centre of community activities, a place where they learn to reduce certain effects. Perhaps after this, PPR Bandar Baru HICOM, for example. Those are among the places we are currently studying, or at Lembah Subang, which we will take over from KPKT after several matters are completed.

Kampung Tunku raised the issue of nuclear, which has created a new segment among the public, pro and contra, although each raised various matters. Among them, the gas pipeline, which we cannot control, let alone matters related to nuclear. I had guessed that these are among the matters that would arise.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Sorry, Kampung Tunku did not raise nuclear.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Siapa yang membangkitkan nuklear tadi? Tidak ada? Tapi saya hendak sebutkan juga di sini Kota Raja. Kota Raja tidak ada tetapi apa yang saya hendak sebutkan di sini, nuklear ini adalah usaha kita untuk mempelbagaikan punca kuasa ataupun punca tenaga kita di masa hadapan dan sebab itu kita mulakan dengan pembinaan kapasiti kita, kita tidak boleh bergantung dengan pihak luar semata-mata. Kita membina kapasiti dan kekuatan dalaman kita dahulu supaya pelajar-pelajar ini yang kita ajar hantar ke Tsinghua kerana Tsinghua yang menawarkan biasiswa RM3.7 million dan Kerajaan Negeri menambah RM1 million untuk kos sara hidup atau kos pembiayaan sara diri mereka dan kita harap pelajar, pegawai yang kita hantar ke sana boleh pulang ke sini menyediakan satu rangka dan juga menyediakan penerangan-penerangan kepada masyarakat dan komuniti bagaimanakah konsep tenaga berdasarkan daripada nuklear ini boleh dibangunkan di Negeri Selangor. Ini bukan perkara baru. Kementerian Tenaga di Peringkat Persekutuan (Federal Ministry of Energy) juga mula meneroka hal ini dan sejak awal tahun ini beberapa diskusi perbincangan, beberapa pengumuman daripada pihak-pihak terbabit telah kita kemukakan atau telah kita bangkitkan sebelum ini.

Soalan yang ketiga saya rasa daripada Bukit Gasing juga adalah berkenaan sejauh manakah arah digitalisasi Jabatan Kerajaan. Ini terangkum sedikit sebanyak dalam usaha kita di dalam beberapa inisiatif Kerajaan Negeri antaranya AI Trailblazers. AI Trailblazers kita bukan buat mesin ataupun buat ChatGPT, kita bukan Gemini, tetapi kita buat kumpulan mengikut Jabatan-jabatan dan di antara badan dan institusi yang terlibat adalah Pihak-pihak Berkuasa Tempatan (PBT), ada 4 Majlis Bandaraya yang kita anggap inilah yang telah bersedia membuat satu solusi terhadap permasalahan isu yang mereka rangkumkan dan kemudian isu itu dilahirkan dengan kumpulan daripada AI Trailblazers. Kita bekerjasama dengan Google dan saya ada mereka dan melahirkan satu solusi dalam konsep AI ataupun penyelesaian AI atau solusi AI dan itu adalah salah satu langkah. Bukan hanya kita menyediakan alatan, machinery atau kemudahan yang terkini tetapi ia diciptakan untuk penyelesaian masalah yang semasa supaya ia real. Contohnya Media Selangor. Apa yang Media Selangor buat adalah untuk satu bahan atau pun untuk mengumpulkan semua berita berkenaan dengan Selangor dan mudah diakses di Media Selangor itu. Contohnya Pejabat Tanah dan Daerah (PTD), apa penyelesaiannya? PBT pun ada penyelesaiannya. Jadi kita sudah sampai ke beberapa kohort, tahun hadapan kita akan menyelesaikan dan merangka beberapa kohort. Pagi tadi saya ada jawab, kita akan cuba pergi dapatkan guru-guru sekolah supaya AI ini di bukan bergerak dengan the new machine tetapi dengan penyelesaian dan penggunaan. Ini yang selalu saya tegaskan dan saya selalu sebutkan bahawa ada keperluan ia menjadi satu budaya. Kalau kita hendak buat Smart City, contohnya, Smart City is not about the new machine tetapi bagaimana pembudayaannya secara menyeluruh. Kita sebutlah digitalisasi Negeri, menyebutkan bahawa mereka telah mencapai tahap Smart State pada tahun ini. Ukurannya apa? Ukurannya berdasarkan KPKT (Kementerian Perumahan dan Kerajaan Tempatan, Ministry of Housing and Local Government) kerana semua Pihak Berkuasa Tempatan mereka telah menyelesaikan tahap satu, tetapi kita Majlis Perbandaran Kuala Selangor telah sampai tahap 1, Majlis Perbandaran Hulu Selangor mungkin daripada tahap 1, Majlis Bandaraya Subang Jaya dan PJ telah sampai tahap 3, tetapi kita tidak ada Sabak Bernam. Sabak Bernam tidak sampai ke tahap 1, sebab apa? Sebab tidak ada kriteria yang boleh dipertanggungjawabkan. Kita tidak mahu push itu, Yang Berhormat, sebab nanti kalau kita push, benda itu akan jadi fake atau tidak digunakan. Yang kita mahu ia digunakan, dan itulah yang terjadi kalau kita lancarkan Program PLATS. PLATS dilancarkan untuk menyelesaikan masalah peniaga-peniaga yang tidak boleh menjaja, tetapi hari ini apabila proses itu telah berjalan beberapa tahun, kita telah mengumpulkan 100 ribu penjaja dan peniaga-peniaga kecil di seluruh Negeri Selangor di bawah platform PLATS. Di sana mereka diupayakan ataupun dipertingkatkan kemahiran mereka dan buktinya jualan Bazar Ramadhan kita merekodkan jualan yang sangat besar. Di Bazar Ramadhan Stadium Shah Alam rekodnya RM1.7 million jualan. Seluruh Selangor yang direkodkan dengan Agro Bank sahaja RM7 million, yang tidak termasuk Maybank dan sebagainya. Keseluruhan yang direkodkan RM200 million di Negeri Selangor sahaja, tetapi apa yang menggembirakan, sebahagian daripadanya sudah mula ada transaksi di dalam talian. Itu yang kita mahu. Bukan hanya kita mempunyai E-Wallet kita, kita mempunyai kemudahan kita, tetapi ia digunakan dengan secara meluas. Kalau kita pergi ke Negara China, jualan di tepi jalan pun akan menggunakan QRCode atau WeChat Pay, tidak menggunakan note. Kalau kita gunakan notes, walaupun Sedara Tze Han cina confirm cina, dia tahu dah cina dari Negara lain, bukan dari Negara China, sebab tidak menggunakan aplikasi-aplikasi yang digunakan secara meluas di Negara tersebut. Jadi ini perkara yang kita hendak buat perubahan transformasi Kerajaan, itulah yang kita akan laksanakan melalui AI Trailblazers, dan sebagainya untuk kita menyelesaikan ataupun kita peruntukkan secara keseluruhan tentang Belanjawan kita atau untuk digitalisasi.

SpeakerEN

Ya, Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Tapi Yang Amat Berhormat, boleh atau tidak saya sebagai rakyat Selangor, menjelang mungkin 2 tahun daripada hari ini, tidak perlu datang ke mana-mana kaunter kerajaan untuk apa-apa urusan, semua boleh dilakukan di atas talian? Boleh atau tidak kita sampai ke tahap tersebut, atau set satu target date kita sampai ke tahap tersebut?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Saya percaya boleh. Kalau kita sudah menggunakan sepenuhnya sekarang ini pun, sebahagian daripada pembayaran cukai, pembayaran petak tanah, pembayaran-pembayaran tertentu, pembayaran saman. Saya cuba sendiri pembayaran saman kereta. Saya kena saman di Kajang, dia tidak tahu itu kereta saya kut, jadi disaman, tetapi tidak apa, kita bayar. Alhamdulillah dalam tempoh 3 ke 4 minit proses pembayaran itu selesai. Cuma pasti akan ada permintaan sebagaimana yang disebutkan, ada warga emas, ada mereka yang tidak biasa dengan penggunaan, pengendalian atas talian dan sebagainya. Saya lihat masih lagi kita perlukan itu. Pun begitu, kita sudah mempercepatkan, meringkaskan sebaik mungkin untuk memastikan digitalisasi itu sampai ke tahapnya. Menjadi Negeri digital bukan hanya alatnya, machinery nya terkini, tetapi juga budaya penggunaan digitalisasi itu digunakan. Itu yang pentingnya. Sebab itu kita laksanakan aplikasi, sebagai contoh aplikasi Nine. Ini aplikasi sebenarnya. Kerajaan Negeri sedang menari salah satu aplikasi. Kita ada aplikasi SELANGKAH, kita ada aplikasi Nine, kita ada CEPAT sebelum ini dan pelbagai yang lain. Jadi sekarang ini kita hendak rangkum menjadi satu supaya menjadi single window untuk pendaftaran dan juga untuk parking dan juga perkara-perkara lain. Sebab itu apabila kita terlibat dengan sistem parking, itu bukan kita nak kutip 10% itu sahaja. Kerajaan Negeri hendak pastikan ada integrated solution untuk penyelesaian rakyat secara menyeluruh menggunakan sistem itu. Kita agak bangga kerana sistem E-Parking kita atau Smart Parking kita menggunakan baik dan orang boleh menempah dan booking ataupun menempah kawasan parking mereka pada waktu-waktu tertentu. Tapi apa yang saya hendak sebutkan dengan jelas di sini, usaha ini berterusan dan ia memerlukan satu pemantauan ataupun pelaksanaan. Apa yang kita laksanakan sekarang melalui SBU, kita mengumpulkan semua PBT mereka. Tidak boleh lagi melancarkan program mereka sesuka hati tanpa leverage dengan izin dengan beberapa local council yang lain supaya standard itu boleh digunakan. Memang mudah untuk kita laksanakan apa yang kita panggil sebagai super web ataupun super apps. Itu memang semua orang akan cakap kita hendak buat super apps, tetapi super apps untuk apa? Sebagai contoh, untuk kesihatan semuanya digunakan sepenuhnya oleh SELANGKAH. Untuk E-Parking semuanya menggunakan Pin ataupun Nine yang kita sedang bangunkan dengan E-Wallet yang kita sudah bangunkan, atau pun ada Selangor Finntack telah kita bangunkan, Selangor Advance dan sebagainya. Ini semua memerlukan peragaman atau penyeragaman di kalangan Pihak Berkuasa Tempatan dan seluruh transaksi-transaksi yang ada. Jadi kita permudahkan satu persatu yang praktikal dan sebagainya supaya kita bukan hanya mencipta best machine, sebab machine ini, teknologi ini bergerak dengan sangat pantas dan kadangkala kita tidak mampu untuk mengejar atau tidak mampu untuk menyelesaikan secara keseluruhannya. Jadi itu sedikit banyak yang saya telah jelaskan berkenaan bajet Belanjawan. Saya ulang balik tentang kepelbagaian, itu kenapa pelbagai itu wujud dengan nilai yang tinggi atas sebab beberapa faktor. Saya sebutkan tentang PPAS tadi, saya sebutkan tentang nuklear dan terakhir tentang digitalisasi yang menjadi usaha yang berterusan dan image yang saya hendak, bukan sahaja label yang kita hendak kata kita sudah menjadi Smart State, sebab kita semua sudah level 1, itu belum sampai ke tahap aplikasi yang konon-nya.

Tetapi saya juga gembira walaupun kita belum lagi di kategori Smart State, tetapi digunakan secara menyeluruh oleh rakyat berdasarkan inisiatif-inisiatif dan kerangka yang telah kita bangunkan beberapa tahun yang lepas. Terima kasih Yang Berhormat.

SpeakerEN

Ahli-ahli Yang Berhormat sekalian, adapun masalah di hadapan Dewan ini ialah suatu usul yang berbunyi berikut. Bahawa menurut Seksyen 9 Sub Seksyen 4(3) Akta Kumpulan Wang Pembangunan 1966, Dewan ini membuat penetapan bahawa peruntukan sebanyak RM1,370,000,000.00 yang dinyatakan dalam anggaran perbelanjaan pembangunan yang dibentangkan di hadapan Dewan mengikut Seksyen 4(1) Akta yang sama seperti mana terdapat di jadual hendaklah diluluskan.

Ahli-ahli Yang Berhormat yang bersetuju sila kata ya.

Ahli-ahli Yang Berhormat yang tidak bersetuju sila kata tidak.

Usul ini dipersetujui.

Motion Number 14 of 2025 Motion on Amendment of the Controlling Officer of Trust Funds under Section 10 of the Financial Procedure Act 1957 Unlicensed Factory Trust Fund...Motion

Secretary of the HouseEN

Aturan mesyuarat seterusnya. Usul Nombor 14 Tahun 2025, Usul Pindaan Pegawai Pengawal Kumpulan Wang Amanah di bawah Seksyen 10 Akta Tatacara Kewangan 1957, Kumpulan Wang Amanah Kilang Tanpa Kebenaran.

Speaker

Ya pencadang.

Dato' Ng Suee LimDAP · PHSekinchanEN

Tuan Speaker dan Ahli-ahli Yang Berhormat sekalian, saya dengan suka citanya memohon membawa satu usul di dalam Dewan Yang Mulia ini yang berbunyi seperti berikut. Bahawa Dewan Negeri Selangor yang bersidang pada hari ini bersetuju supaya membuat pindaan ke atas kelulusan yang telah diberikan untuk membuat satu ketetapan selaras dengan Seksyen 10 Akta Tatacara Kewangan 1957 seperti yang berikut: Menubuhkan Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) di mana sebanyak 1% daripada setiap penerimaan bayaran premium tanah atau dan premium tambahan susulan kelulusan permohonan menukar kategori kegunaan dan syarat tanah hendaklah disumbangkan kepada Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) ini yang akan diselenggarakan oleh Jawatankuasa Tetap STANDCO Kilang Tanpa Kebenaran (KDK) Negeri Selangor. Namun begitu, Pegawai Pengawal Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) yang diluluskan dalam sidang Dewan Undangan Negeri yang lepas adalah Pengarah Tanah dan Galian Selangor yang juga bertindak selaku Pengerusi Jawatankuasa Pemegang Amanah, memohon dipinda kepada Yang Berhormat Setiausaha Kerajaan Negeri Selangor.

Yang Berhormat Tuan Speaker dan Ahli-ahli Yang Berhormat sekalian, Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) yang telah diluluskan dalam sidang Dewan Negeri yang lepas merupakan akaun amanah Kerajaan yang ditubuhkan di bawah Seksyen 10 Akta Tatacara Kewangan 1957. Memandangkan terdapat keperluan sebahagian daripada hasil Kerajaan Negeri disumbangkan ke akaun Kumpulan Wang Amanah (KWAKTK) ini, pihak Perbendaharaan Negeri Selangor berpandangan adalah bertanggungjawab Yang Berhormat Setiausaha Kerajaan Negeri Selangor sebagai Pegawai Pengawal di Peringkat Kerajaan Negeri Selangor untuk menjadi Pegawai Pengawal KWAKTK, Kumpulan Wang Amanah KTK tersebut dan seterusnya sebagai Pengerusi Jawatankuasa Pentadbiran Kumpulan Wang Amanah KTK. Sehubungan itu, Mesyuarat Majlis Mesyuarat Kerajaan Negeri Ke-32/2025 bertarikh 31 Oktober 2025 telah meluluskan secara dasar pembentangan Kertas Usul Pindaan Pegawai Pengawal Kumpulan Wang Tabung Amanah KTK di Bawah Seksyen 10 Akta Tatacara Kewangan 1957, serta Pengerusi Jawatankuasa Kumpulan Wang Amanah KTK adalah Yang Berhormat Setiausaha Kerajaan Negeri Selangor, dan senarai keanggotaan Jawatankuasa Kumpulan Wang Amanah KTK terbaru seperti yang diterangkan di dalam perkataan warna merah dan naskhah Surat Ikatan Amanah (SIA) yang telah diedarkan kepada semua Ahli-ahli Yang Berhormat.

Yang Berhormat Tuan Speaker dan Ahli-ahli Yang Berhormat sekalian, saya memanjangkan cadangan sokongan terhadap pindaan Pegawai Pengawal dan Pengerusi Jawatankuasa Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) diangkat untuk pertimbangan. Yang Berhormat Tuan Speaker dan Ahli-ahli Yang Berhormat sekalian, maka dengan itu saya mohon mencadangkan.

Tuan Ng Sze HanDAP · PHKinraraEN

Tuan Speaker, saya menyokong.

SpeakerEN

Ahli-ahli Yang Berhormat sekalian, adapun masalah di hadapan Dewan ini adalah satu usul hendaklah dibawa oleh Yang Berhormat Sekinchan, iaitu Pindaan Pegawai Pengawal Tabung Amanah KTK di bawah Seksyen 10 Akta Tatacara Kewangan 1957, Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK), oleh itu saya kemukakan usul ini untuk dibahaskan. Memandangkan tidak ada ADUN yang membahas, jadi tidak perlu lah Yang Berhormat Sekinchan untuk menggulung. Ahli-ahli Yang Berhormat sekalian, bahawa Dewan Negeri Selangor yang bersidang pada hari ini bersetuju membuat pindaan ke atas kelulusan yang telah diberikan untuk membuat satu ketetapan selaras dengan Seksyen 10 Akta Tatacara Kewangan 1957 seperti yang berikut: menubuhkan Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) di mana sebanyak 1% daripada setiap penerimaan bayaran premium tanah atau dan premium tambahan susulan kelulusan permohonan menukar kategori kegunaan dan syarat nyata tanah hendaklah disumbangkan kepada Kumpulan Wang Amanah Kilang Tanpa Kebenaran (KWAKTK) ini, yang akan diselenggarakan oleh Jawatankuasa Tetap (STANDCO) Kilang Tanpa Kebenaran (KTK) Negeri Selangor. Namun begitu, Pegawai Pengawal Kumpulan Amanah Kilang Tanpa Kebenaran (KWAKTK) yang diluluskan dalam sidang Dewan Negeri yang lepas adalah Pengarah Tanah dan Galian Selangor dan juga bertindak selaku Pengerusi Jawatankuasa Pemegang Amanah, mohon dipinda kepada Yang Berhormat Setiausaha Kerajaan Negeri Selangor.

Ahli-ahli Yang Berhormat yang bersetuju sila kata ya.

Ahli-ahli Yang Berhormat yang tidak bersetuju sila kata tidak.

Usul ini dipersetujui.

Secretary of the House

Usul Seterusnya.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Speaker, Peraturan Tetap, Peraturan 87, Speaker.

Speaker

Ya.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Memandangkan kita ada lagi 2 jam sebelum hendak habiskan Dewan, cuma saya minta berkenaan soalan lisan. Speaker, boleh atau tidak kami dapatkan yang balance itu, sebab ada sebahagian besar kami tidak dapat lagi.

SpeakerEN

Soalan lisan juga kita akan berikan pada hari ini juga. Kalau hari ini adalah hari yang terakhir, jadi saya mohon supaya pegawai kepada semua Ahli-Ahli Mesyuarat Kerajaan Negeri untuk berpesan kepada semua pegawai supaya menghantarkan teks atau pun jawapan lisan yang belum sempat dijawab kepada semua Ahli Yang Berhormat pada hari ini sebelum sidang ditangguhkan. Seterusnya saya menjemput Setiausaha.

Secretary of the HouseEN

Usul seterusnya, Nombor Usul 15 Tahun 2025, Usul di bawah Peraturan Tetap 76(5) oleh Yang Berhormat Kajang.

Tuan Cheong Kian YoungPKR · PHKajangEN

Mr Speaker and Honourable Members, I wish to move a motion as follows. That, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House receives the Report of the Select Committee on Statutory Bodies and State-Owned Subsidiaries (JP-ABAS) on the Direction of the Selangor State Development Corporation (PKNS), which has been tabled in this Honourable House as Meeting Paper Number 37 of 2025. In the meetings of the Select Committee on Statutory Bodies and State-Owned Subsidiaries (JP-ABAS) No. 5/2024, 12/2024, 1/2025, 6/2025, 8/2025 and No. 11/2025, which were attended by the Top Management of PKNS, the Committee identified several matters arising concerning the direction of PKNS that require the attention of the Selangor State Government to ensure the sustainability of this agency and to ensure the continued implementation of State Development policy. It was informed to the Committee that the Direction of PKNS is no longer focused on the development of new towns or affordable housing development; instead, PKNS today positions its role as a property developer like other private developers in the State of Selangor. The Committee was informed that, apart from the property sector, PKNS through its subsidiaries also engages in the energy, waste management and healthcare services sectors. The Committee found that PKNS faces difficulties in competing with other land development companies in the market. The PKNS brand is often equated with the development of low-cost and low-medium cost houses, and the PKNS brand has a perception problem that hinders PKNS from developing high-value property units. The Committee took note of the explanation from PKNS that the management and staff of PKNS inherited a legacy of work culture that makes it difficult for PKNS to transition into a company that can compete with private developers in the free market. The Committee found that PKNS needs to achieve higher profits to cover high operating expenditure costs and debt repayments.

Therefore, the Committee's recommendations are that PKNS should take on a new mandate in the development of the State of Selangor, where the impact of PKNS's activities can have a direct positive effect on the Selangor GDP (KDNK) by implementing high-impact initiatives. The Committee is of the view that PKNS may continue its existing business activities but should add new high-impact business activities such as redevelopment through regeneration. PKNS needs to form a special department to identify redevelopment opportunities required in the State. Construction of foreign worker centralised accommodation (CLQ): efforts to build CLQ at present are too few compared with the number of foreign workers in the State. CLQ does not necessarily need to target factory workers, but work in the construction services sector. CLQ can reduce pressure and competition on the B40 group for the rental of existing low-cost houses. Playing the role of a major infrastructure developer, PKNS needs to play a role in becoming the main driver of the Selangor public transport development plan, as in Penang, where a Government agency has driven the development of public transport projects even though PKNS is the main developer. Funds are still provided from external sources such as the World Bank, the Asian Development Bank or the Federal Government. Without any agency driving public transport infrastructure development, this development plan will not be implemented. Development of the PKNS Recycling Industrial Park: PKNS may develop a sustainable Recycling Industrial Park as master developer that complies with the conditions stipulated by the Department of Environment, with appropriate pollution control measures, through the development of a Recycling Industrial Park.

PKNS may rent out factory lots directly to SME entrepreneurs to become catalysts for this industry and the KDNK Selangor. Healthcare service providers and the premium economy sector: there is significant demand for healthcare services and the premium economy sector, which has the potential to become an intermediary sector between the public healthcare services provided by the Ministry of Health (KKM) and the premium healthcare services provided at private hospitals. The Committee recommends that PKNS implement its own development projects without joint venture (JV) collaboration with outside companies, considering that PKNS has sufficient expertise and senior staff experience. The Committee recommends that PKNS achieve a yield rate of 1% of the KDNK Selangor to become a catalyst for 2% to 5% of the KDNK Selangor. Therefore, Kajang humbly proposes.

Tuan Ong Chun WeiDAP · PHBalakongEN

Mr Speaker, I second.

Deputy SpeakerEN

Thank you, Honourable Member. Honourable Members, this motion has now been seconded, and I open the motion for debate. Honourable Members, the question before this House is a motion that, pursuant to paragraph 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House receives the Report of the Select Committee on Statutory Bodies and State-Owned Subsidiaries (JP-ABAS) on the direction of the Selangor State Development Corporation (PKNS), which has been tabled in this Honourable House as Meeting Paper Number 37 of 2025.

Honourable Members who agree, please say "yes".

Honourable Members who do not agree, please say "no".

The motion is agreed to.

CLERK OF THE HOUSE: The next motion is Motion Number 16 of 2025, a motion under Standing Order 76(5) by the Honourable Member for Balakong.

Tuan Ong Chun WeiDAP · PHBalakongEN

Mr Speaker and Honourable Members, I wish to move a motion as follows. That, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House receives the Report of the Select Committee on Statutory Bodies and State-Owned Subsidiaries (JP-ABAS) on the restructuring of subsidiaries and agencies as statutory bodies, which has been tabled in this Honourable House as Meeting Paper Number 38 of 2025. Mr Speaker, in the meeting of the Select Committee on Statutory Bodies and State-Owned Subsidiaries (JP-ABAS) No. 11/2024, the Committee agreed to propose a division and restructuring of the existing categories of Government-linked companies (GLCs) in the State of Selangor. Then, in Meeting No. 12/2024, the Committee summoned the CEO of PKNS and the CEO of Menteri Besar Incorporated (MBI) to obtain views on separating companies that carry out administrative operations from business activities, and on making companies that carry out administrative operations of statutory bodies or corporations. Meanwhile, in Meeting No. 14/2024, the Committee summoned the Human Resource Management Division of the Selangor State Government to give views on restructuring the subsidiaries of MBI and PKNS so that subsidiaries carrying out Government functions become official Government agencies. Based on the evidence of PKNS, MBI and the Human Resource Management Division of the Selangor State Government, the Committee found that the subsidiaries under the Selangor State Government are generally divided into the following categories: firstly, companies oriented towards profit and dividends; secondly, strategic companies oriented towards natural monopoly profits, such as KDEB Waste Management Sdn Bhd and Pengurusan Air Selangor Sdn Bhd, which have no competitors from the private sector; thirdly, strategic companies acting as one stop agency to process applications from the private sector, such as KUSEL; and fourthly, companies functioning as Government agencies, such as Tourism Selangor, Invest Selangor, Media Selangor and so on. These companies receive revenue grants from the Selangor State Government like other Government agencies and do not carry out any business. Therefore, the Committee is of the view that profit- and dividend-oriented companies need to be benchmarked against comparable companies to determine an appropriate profit margin.

Next, companies need to set KPIs in the form of profit margins and dividends to be returned to the State Government. The Committee also recommends that the State Government appoint a regulatory agency for natural profit-oriented companies to ensure the achievement of service performance KPIs and financial KPIs. In addition, the State Government should establish a mechanism to control operating costs and a mechanism for returning dividends to the State Government for companies acting as one stop agencies. The Committee is of the view that companies functioning as Government agencies should be restructured as official statutory bodies under the State Government to guarantee clarity of mandate, integrity of governance and re-coordination. Sorry, coordination of structure, staffing and more effective regulation; restructuring as statutory bodies also carries taxation implications for these agencies. For the time being, agencies operating as companies are subject to tax on the income they earn. The Committee is of the view that with a clear classification between all these entities, KPIs for all these entities can be set clearly and fairly according to goals and objectives. In addition, confusion about which entities should generate profits and provide dividend returns to the State Government can be avoided. Mr Speaker, Balakong humbly moves.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Mr Speaker, I second.

Deputy SpeakerEN

Honourable Members. This motion has now been seconded. I open the motion for debate. Honourable Members, the question before this House is a motion that: that, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House receives the Report of the Select Committee on Statutory Bodies, Statutory Bodies and State-Owned Subsidiaries (JP-ABAS), on the restructuring of subsidiaries and agencies as statutory bodies, which has been tabled in this Honourable House as Meeting Paper Number 38 of 2025.

Honourable Members who agree, please say "yes".

Honourable Members who do not agree, please say "no".

The motion is agreed to.

Secretary of the HouseEN

The next motion, Motion No. 17 of 2025. A motion under Standing Order 76(5) by the Honourable Member for Seri Serdang.

Tuan Abbas Salimmi Bin Che Adzmi @ AzmiAMANAH · PHSeri SerdangEN

Mr Speaker and Honourable Members, I wish to move a motion as follows. That, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House receives the Report of the Select Committee on Statutory Bodies and State-Owned Subsidiaries (JP-ABAS) on the Issue of the Financial Sustainability of Yayasan Selangor, which has been tabled in this Honourable House as Meeting Paper Number 39 of 2025.

Honourable Member, Deputy Speaker and all Honourable Members. In the JP-ABAS Meeting No. 10 of 2025, on 25 August 2025, Yayasan Selangor, led by the Chief Executive Officer of Yayasan Selangor himself, attended to provide an explanation on the financial status of its operations and its direction. Yayasan Selangor informed that its main direction is to become the leading agency in the education sector of the State of Selangor, by focusing 70% of its work and operational plans on the education sector.

To ensure this can be achieved, Yayasan Selangor has implemented four main programmes mandated by the Selangor State Government and tabled in the Selangor State Legislative Assembly, namely:

1. Selangor Industrial Internship Programme (SISPRO) - allocation of RM300,000 for 300 recipients,

2. Program Jerayawara Siswa KITASelangor (JSS) - 16 IPTA across Malaysia and other sides involving RM122,000-RM140,000,

3. Program Baucar Buku Kita Selangor involving 2,000 Selangor university students with an allocation of RM400,000,

4. Geran Penyelidikan Negeri Selangor (GPNS), IPTA-IPTS conducting education, and a total of RM1.5 million has been allocated for this programme.

All allocations used to implement these programmes are channelled through the State Government under the Standing Committee on Education, and no internal allocation of Yayasan Selangor has been used for these programmes. Yayasan Selangor has optimised the use of its headquarters location by making the Yayasan Selangor Tower the Selangor Education Hub. This hub covers the establishment of a Selangor Student Hub, the implementation of cross-agency collaboration to strengthen impact, and the construction of a centre for the development and solution of Selangor education programmes so that they are more systematic and integrated. Yayasan Selangor also informed that there are challenges in generating financial resources to expand the education agenda of Yayasan Selangor, in line with its role as the main leader of education in the State of Selangor.

Efforts that have been made to face these challenges are that Yayasan Selangor has established strategic relations with other GLCs of Selangor for the purpose of developing land assets that have not yet been developed. Among the initiatives implemented are the signing of a Memorandum of Understanding (MoU) with Permodalan Negeri Selangor Berhad (PNSB) and several other collaborative plans with related GLCs. Yayasan Selangor also informed that they face the challenge of meeting the need to rebrand its education agenda, especially after almost 55 years of operation and continuous contribution to the development of the State of Selangor.

Among the actions already taken by Yayasan Selangor is to shoulder the responsibility of the main leader of state education by implementing programmes not only for students sponsored by Yayasan Selangor but also for all students of Selangor, implementing higher-impact programmes, and restructuring the organisation with emphasis on the functions of the Education Department of Yayasan Selangor. Likewise, among the programmes carried out is conducting joint programmes in collaboration with the Selangor State Education Department (JPNS) as their strategic partner. This is because student data at every school is different, and the Selangor State Education Department (JPNS) is the party that has access and authority to assess and determine suitable schools based on students' needs and backgrounds.

At the Selangor State level, the Selangor State Government gives schools the opportunity to implement special academic programmes for Form 4 and Form 5 students as preparation for the SPM examination. Yayasan Selangor's initial target for the adopted school programme is to involve 40 schools, and this number was proposed by the Selangor State Education Department (JPNS) based on data analysis and the needs of students in this State. Yayasan Selangor also informed that at this time it does not have any programme or scheme to assist in financing overseas study, because such financing is directly under the management of the Selangor State Government Scholarship.

Yayasan Selangor also informed that a proposal has been submitted to the Selangor State Government that management of the State Government Scholarship and Education Fund be handed over to Yayasan Selangor, covering a total of 11 programmes including financing and loan programmes for students studying overseas. Deputy Speaker, another matter that was informed concerns the assets of Yayasan Selangor. Most of Yayasan Selangor's assets are in the form of property, specifically the Yayasan Selangor building in Kampung Baru, Kuala Lumpur, the Yayasan Selangor building at Bukit Bintang, the Yayasan Selangor Tower in Petaling Jaya (PJ), agricultural land in Serendah and Kuala Langat, and several other property assets.

Yayasan Selangor carries out a mandate to support education efforts, and the investment returns of its assets: Yayasan Selangor requires better investment returns to cover the expenditure of education initiatives. Yayasan Selangor informed that the total asset value of the Yayasan Selangor Tower in Petaling Jaya, the Yayasan Selangor building in Kampung Baru, and the Yayasan Selangor building in Bukit Bintang is estimated at around RM300 million and is listed as strategic assets of Yayasan Selangor. The assets of Yayasan Selangor are estimated to be worth RM1 billion with a revenue return rate of RM12 million a year, an investment return rate of 1.2%. Yayasan Selangor also explained that it cannot provide any estimate of the value of the property it owns because the last property valuation was carried out in 2015.

To provide that information, a new official valuation must first be carried out based on current market value. Yayasan Selangor also informed that for Tanah Warta, it acts as caretaker and is currently in the process of applying for a formal lease. Committee's findings, the Committee found

that the return on Yayasan Selangor's assets at a rate of 1.2% a year is far too low. The Committee found that the fixed deposit rate of return is much higher than the rate of return of these Yayasan Selangor assets. The Committee found that Yayasan Selangor does not have an actual current valuation of its assets. The last valuation of the Foundation's assets was carried out in 2015.

The Committee also found that Yayasan Selangor does not have a clear business plan for most of its assets to generate returns commensurate with their value. Committee's recommendations: the Committee recommends that Yayasan Selangor carry out a re-evaluation of all existing assets at current valuation rates. The Committee also recommends that Yayasan Selangor be more aggressive in leveraging existing assets to increase the rate of revenue return.

Yayasan Selangor needs to have a business plan to manage all its assets. Thirdly, the Committee recommends that Yayasan Selangor target a return on assets (ROA) rate of at least 6% a year so that the goals and education mandate of Yayasan Selangor can be fulfilled. If the management of Yayasan Selangor cannot devise a plan to obtain returns at this rate, the management should consider the option of disposing of these property assets and investing the proceeds in other investment instruments. That is all for now, Mr Speaker. Seri Serdang humbly moves.

Tuan Cheong Kian YoungPKR · PHKajangEN

Deputy Speaker, I second.

Deputy SpeakerEN

Honourable Members, this motion has already been seconded. I open the motion for debate.

Honourable Members, the question before this House is a motion that reads: That pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House accepts the Report of the Select Committee on State Statutory Bodies and State Subsidiary Companies (JP-ABAS) concerning the Financial Sustainability Issue of Yayasan Selangor, which has been tabled in this August House as Meeting Paper No. 39 of 2025.

Honourable Members who agree, please say aye.

Honourable Members who do not agree, please say no.

The motion is agreed to.

Secretary of the HouseEN

The next motion, Motion No. 18 of 2025. Motion under Standing Order 76(5) by the Honourable Member for Dusun Tua.

Datuk Wira Johan Bin Abd AzizUMNO · BNDusun TuaEN

Thank you, Deputy Speaker, and Honourable Members. I wish to move a motion that reads as follows.

That pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House accepts the Report of the Select Committee on the District and Land Office (JP-PADAT) of the Selangor State Legislative Assembly concerning the Issue of Leasehold of Government Gazetted Land, which has been tabled in this August House as Meeting Paper No. 40 of 2025. By way of brief background, at the First Meeting of 2025 dated 25 March 2025, a complaint was raised, received from the Member of the State Legislative Assembly for Pelabuhan Klang, concerning a parcel of open land gazetted for public use which was alleged to have been granted to a private company in the Klang district. The committee agreed to visit the Klang District and Land Office and obtain clarification on this matter and several other matters.

At Meeting No. 2 of 2025 dated 17 April 2025, at the Klang District and Land Office, the Klang District and Land Office (PDT) together with the Selangor State Land and Mines Office (PTGS) gave a briefing and explanation on this issue. The following witnesses attended before the committee to give explanations, in particular the Director of PTGS and the District Officer of Klang, and the Member of the State Legislative Assembly for Pelabuhan Klang was also invited, as well as all members of the JP-PADAT Committee. As for the committee's recommendations, I wish to state that:

1. The committee recommends that PTGS make it mandatory for every application for leasehold of Government Reserve Land to be made together with an on-site notice. The application shall be placed at a clearly visible, prominent location for 60 days.

2. The committee recommends that PTGS make it mandatory for applications for leasehold of Reserve Land to be accompanied by feedback and views from local representatives and the community.

3. The committee recommends that PTGS add the obligation to obtain official technical comments from the custodian agencies of Government Reserve Land, such as the Local Authority, the Selangor Water Management Authority, the State Economic Planning Unit and the District Land Administrator.

4. The committee recommends that land custodian agencies be given a period of one month to submit technical comments, so that technical comments can be prepared in detail but without unduly delaying the leasehold application process.

5. The committee recommends that regular control and monitoring be carried out for all approved leases to ensure compliance with lease agreements. Periodic monitoring at least once every 2-3 years, together with random monitoring according to area priority and public complaints.

6. The committee recommends that the application process for leasehold of State Government Gazetted Land be reviewed so that applications begin at the District and Land Office before being forwarded and checked by PTGS for consideration by the Honourable Dato' Menteri Besar, in order to enhance accountability and transparency and shorten the application process period.

This committee also wishes to record its thanks to all representatives of agencies and individuals who submitted evidence, and to all parties directly or indirectly involved in making this report possible. The committee hopes that good relations can be maintained, along with improving excellent performance in carrying out the respective functions and roles. This report has been discussed and approved at the Select Committee on District and Land Offices Meeting No. 5/2025 on 10 October 2025. Dusun Tua respectfully moves the motion.

Deputy SpeakerEN

Does anyone second?

Puan Wong Siew KiDAP · PHSeri KembanganEN

Mr Speaker, I second.

Deputy SpeakerEN

Honourable Members, this motion has already been seconded. I open the motion for debate.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Mr Speaker. This concerns the land issue that I also raised earlier during the Committee of Supply. Regarding the issue, this is an integrity issue, lah. The way Government officers report the status or current condition on the ground is not the same. Where it is reported as if the land has rubbish and must be given to the private sector, whereas the area is a designated buffer zone. And this is an integrity issue. That is why I thank the PADAT Committee for taking seriously the complaint made by me, and I hope this issue will not happen again in the future. And what I want to convey today is based on the findings made by the PADAT Committee, which is how, this important finding of the committee. The committee found that the comments given by the District Land Administrator and the custodian agencies may not

reflect the actual conditions on the ground and did not take into account the conditions of the area surrounding the reserve land applied for. That means there was an attempt to manipulate the actual facts on site, causing it to be approved at a higher level. Yet the report was prepared by the Klang District Land Administrator's Office, but the report was not honest. So I hope that action will be taken as a lesson, considering that the Klang Land and District Office already had a case earlier this year, where transfer of ownership was done, as people say, not according to the actual procedure. And this must result in a show-cause letter being issued against the officer who reported that the land was not maintained and was misused as an illegal rubbish dumping ground, whereas it did not happen as reported. So, as a lesson, I propose in this August House that a show-cause letter be issued and action must be taken against the officer who made the false report on the status of the site. That is all, Mr Speaker, thank you to the PADAT Committee.

Deputy SpeakerEN

Thank you, Pelabuhan Klang. Is there an explanation from the Government? No. Honourable Members, the question before this House is a motion that reads: That pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House accepts the Report of the Select Committee on the District and Land Office, JP-PADAT, of the Selangor State Legislative Assembly concerning the issue of Leasehold of Government Gazetted Land, which has been tabled in this August House as Meeting Paper No. 40 of 2025.

Honourable Members who agree, please say aye.

Honourable Members who do not agree, please say no.

This motion is agreed to.

Secretary of the HouseEN

The next motion, Motion No. 19 of 2025, Motion Under Standing Order 76(5) by the Honourable Member for Seri Kembangan.

Puan Wong Siew KiDAP · PHSeri KembanganEN

Mr Speaker and Honourable Members, I wish to move a motion that reads as follows. That pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House accepts the Report of the Select Committee on the District and Land Office (JP-PADAT) of the Selangor State Legislative Assembly concerning the Issue of Extension of Tenure for Near-Expiry State Leasehold Titles, which has been tabled in this August House as Meeting Paper No. 41 of 2025. At Meeting No. 1/2025 dated 25 March 2025, I raised the issue of state leasehold land approaching or having reached the expiry date of leases held by non-government bodies. These lands are reported to have a status of building conditions with

zoning conditions in commercial areas, and this matter leads to a high valuation of property rights. I give one example in my area: an association called Persatuan Quan Yi Seri Kembangan has a building in Serdang town, and this association has just recently celebrated its 78th anniversary. And their building is actually only on a piece of land measuring just 0.106 acres, and unfortunately the lease of that land ended in 2001, and when they tried to apply for an extension of the lease in 2017, they were charged a premium payment of RM496,840.70. That was the premium payment in 2017. So, since they are a non-profit association, they truly cannot afford to pay such a premium.

As a result, the State Government will not be able to collect any revenue, but at the same time cannot carry out any new planning or development on that land because its status is in limbo. So, after we held several meetings, the committee's findings are as follows: The committee found that there are two options for state leasehold titles with residential status that are nearly or already expired, namely number 1, extension of the lease period at a nominal premium rate of RM5,000.00 with a registrar's caveat under Section 90(A) of the NLC for state leasehold titles whose lease period has not yet ended. And reversion at a nominal premium rate of RM1,000.00 with a registrar's caveat under Section 76 of the NLC for state leasehold titles whose lease period has ended. Number 2, the committee found that no option of extension or reversion at a nominal premium rate is offered for state leasehold titles with non-residential status, regardless of the owner's status. The committee also found that the existing state lease extension process is limited to extension for a long period at a significant premium rate. This causes a major financial burden on affected organisations and small businesses.

The committee also found that no form of instalment payment is offered for the premium payment for state lease extension. The committee also found that the long application processing period causes some state leasehold titles to expire before the application has been processed. Finally, the committee also found that many holders of state leasehold titles were unaware that the land titles they hold were close to the lease expiry date. The committee's recommendations are: The committee recommends that PTGS review the PTGS Circulars No. 6/2011 and 3/2020 concerning extension and reversion of state leasehold titles with residential status, to, number 1, standardise the minimum premium rate for state lease extension under Section 90(A) of the NLC and disposal and reversion of state leases under Section 76 of the NLC, and allow any title that is in the process of lease extension under Section 90(A) of the NLC whose lease has expired to continue to be processed as if the lease had not yet ended, to avoid owners having to make a fresh application.

Number 2, the committee recommends that PTGS offer the following options for state leasehold titles with non-residential status. Number 1, lease extension for a period of less than 10 years to reduce the burden of premium payments, or 2, instalment payment of the state lease extension premium. Number 3, the committee recommends that the State Government offer a nominal premium rate with a registrar's caveat for state leasehold titles held by non-profit bodies, namely NGOs, with permission. The committee recommends that PTGS and the District Land Administrator give renewal reminder notices as early as 6 to 10 years before the state lease expires. Thus, Seri Kembangan respectfully moves the motion.

Deputy SpeakerEN

Does anyone second?

Tuan Chua Wei KiatPKR · PHRawangEN

Mr Speaker, I second.

Deputy SpeakerEN

Honourable Members, this motion has already been seconded. I open the motion for debate. Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Deputy Speaker. I rise to support this report, and I very strongly urge the State Government to resolve the land lease problem in the Petaling Jaya area, which has been described in recommendation 6.2 on page 7 of this report. Commercial lands in PJ can be renewed. Some of these leasehold lands have indeed been applied for, and I myself have raised this matter many times in this August House. I hope that for the premium amount that must be paid, there can be an instalment or a scheme under which the people are able to pay the premium. If the premium is at least RM1 million, RM1.1 million for the smallest shop house in the PJ Old Town area, most owners today simply cannot afford to pay it. So I hope, I very much hope, that the State Government will give an answer. The Honourable Dato' Menteri Besar has met with representatives of residents in Petaling Jaya. This matter has been brought up in this House several times, and I hope that before the end of this year there can be an announcement, a scheme to help these owners.

Deputy SpeakerEN

Is there an explanation from the Government? No. Honourable Members, the question before this House is a motion that reads: That pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House accepts the Report of the Select Committee on the District and Land Office (JP-PADAT) of the Selangor State Legislative Assembly concerning the Issue of Extension

of Tenure for Near-Expiry State Leasehold Titles, which has been tabled in this August House as Meeting Paper No. 41 of 2025.

Honourable Members who agree, please say aye.

Honourable Members who do not agree, please say no.

The motion is agreed to.

Secretary of the HouseEN

The next motion, Motion No. 20 of 2025, Motion Under Standing Order 76(5) by the Honourable Member for Sentosa.

Tuan Gunarajah A/L GeorgePKR · PHSentosaEN

Thank you, Honourable Deputy Speaker and Honourable Members. I wish to move a motion that reads as follows: Whereas, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Assembly, this August House accepts the Report of the Selangor State Assembly Committee on Rights and Privileges regarding the statement by the State Assemblyman for Gombak Setia on 24 November 2023, which was tabled in this August House as Meeting Paper Number 46 of 2026.

Some background, Mr Deputy Speaker. During the 2024 Budget Sitting, the Second Meeting of the First Session of the 15th Selangor State Assembly, on Friday 24 November 2023, the Honourable Member for Rawang invoked Standing Order 26(1) to refer the State Assemblyman for Gombak Setia to the Committee on Rights and Privileges to raise the incident, in which Gombak Setia was alleged to have shouted the words "Speaker DAP" in the House. The Honourable Chairman raised this matter at Committee Meeting Number 1/2024 and asked the researchers to check whether this incident had occurred. The Honourable Member for Subang Jaya, at Committee Meeting Number 2/2024, proposed that the matter be considered by the Committee, to determine whether this incident contravened the provisions of the Standing Orders of the Selangor State Assembly or the House Contempt Enactment.

At Committee Meeting Number 2/2024, the Committee agreed to appoint Sentosa as Acting Chairman to investigate this incident, given that the incident involved the Honourable Chairman of the Committee. The Honourable Chairman and Gombak Setia, both of whom are Members of the Committee on Rights and Privileges, were asked to excuse themselves from considering this matter. Mr Speaker, in the evidence of the Honourable Speaker, and also at Meeting Number 2/2024, the Honourable Speaker testified that the shouting had affected the perception of the office of the Speaker of the Selangor State Assembly, which is meant to be non-partisan. The Honourable Speaker also explained that his membership of a political party did not affect his ability to carry out his duties as Speaker of the State Assembly without bias towards any party. The Honourable Speaker also informed the Committee that his membership of the DAP was not relevant to the motion being debated at the time of the incident.

Next, the evidence from the Honourable Member for Gombak Setia. The Honourable Member for Gombak Setia stated that he had no comment or explanation regarding the matter raised, as this meeting was the first meeting he had attended. Gombak Setia also raised several matters, namely the mandate, scope and when the Committee could be called to meet, the parameters of hearing when an issue is raised by State Assemblypersons, and the need for clear notice to be issued beforehand before any person is called to give evidence before the Committee.

The Committee's discussion at Meeting 2/2024: the Committee took note that the meeting today was to decide whether the Committee would proceed with the investigation into the issue raised by the Honourable Mr Speaker against or in connection with the Honourable Member for Gombak Setia.

The Honourable Acting Chairman agreed with the Honourable Member for Gombak Setia that he should be given proper notice before being called to give evidence. The Committee was of the view that there was a need to proceed with the investigation into this matter in order to be fair to all parties involved. The Committee took note of the provision in the Standing Orders of the Selangor State Assembly that a report must be tabled to the House after this matter has been investigated.

The Honourable Member for Subang Jaya also proposed that a procedure similar to that of the courts be adopted as the basis for the Committee's hearing procedure. The Committee decided to hold a hearing from both parties on this matter on 1 (a date to be decided at the next meeting). The Committee also met again on 11 March 2025 at Meeting Number 1/2025, after nearly a year had passed since the Committee's last meeting. Gombak Setia was asked to provide a written explanation or statement issued regarding the incident to the Committee within a reasonable period so that the Committee could determine the next steps.

Committee members were informed of a case involving Batang Kali in 2017, in which the Honourable Dato' Mat Nazeri made a statement that tarnished the good name of the Selangor State Assembly. The Honourable Dato' Mat Nazeri at that time was referred to the Committee on Rights and Privileges, and after further investigation the Committee recommended that the Honourable Dato' Mat Nazeri be subjected to the punishment of reprimand. The committee secretary was asked to write to Gombak Setia to request a written explanation regarding this incident. The committee secretary informed the Committee that Gombak Setia had not provided any response to the letter requesting a written explanation that had been issued.

The Committee considered reprimand as one of the appropriate and proportionate disciplinary actions against the statement issued by Gombak Setia. The purpose of the proposed disciplinary action is to prevent offences of this kind, in which the role and character of the Speaker of the Selangor State Assembly are linked to any business or dispute in the House, from recurring.

Establishment of the Committee: the Committee found that there was no record in the Hansard regarding this incident, but there was an acknowledgement from the Honourable Members for Rawang, Seri Serdang and Subang Jaya that Gombak Setia had issued the statement. The Committee found that a review of the audio and video recordings of the sitting on the day of the incident did record audio of the statement "Speaker DAP" being shouted, but there was no individual video recording of the person who shouted the statement. The Committee found that Gombak Setia had never denied issuing the statement at the Committee meeting. Gombak Setia did not attend the subsequent Committee meetings to deny the statement, or to deny the statement in writing to the Committee. Decision and recommendations of the Committee: Mr Speaker, the Committee agreed that the statement by the State Assemblyman of Gombak Setia, or the State Assemblyman for Gombak Setia, against the Honourable Speaker was impolite and was intended to create ill prejudice towards the Honourable Speaker.

The Committee recommends that a punishment in the form of reprimand in the Selangor State Assembly be imposed on Gombak Setia. The Committee has examined the matter raised by the Honourable Speaker and also Subang Jaya under Paragraph 70(4) of the Standing Orders of the Selangor State Assembly at a Committee meeting. This Committee reminds all State Assemblypersons that they should be more responsible and careful in issuing statements in order to maintain decorum and courtesy in the House. This report was prepared by the Committee on Rights and Privileges and was discussed and approved by the Committee on Rights and Privileges at Committee Meeting Number 3/2025 on 5 November. Thank you, Mr Speaker.

Deputy SpeakerEN

Thank you. Is there a seconder?

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Mr Deputy Speaker, I second the motion.

Deputy SpeakerEN

Honourable Members, this motion has been seconded. I open the motion for debate.

Tuan Mohd Shafie Bin NgahPAS · PNSungai RamalEN

Sungai Ramal. Thank you, Mr Speaker. I have examined this paper line by line and I intend to oppose this motion. I am of the view that there are several defects in this motion, which should have been dropped from the outset, before the motion was brought into this House. There are three defects that I will mention here, Mr Speaker.

The first, in my view, is that this motion does not state what the provision of the offence is. I agree on the need for courtesy and decorum, but in the motion, it does not state what provision of offence was committed by Gombak Setia, and how it is possible, if no provision of offence is stated, that the Honourable Member for Gombak Setia is said to have committed an offence. That is why I state that the first is defective. It is not that I am defective, but it could embarrass an Honourable Member, and not only embarrass an Honourable Member but also embarrass this August House.

The second, regarding the procedure that was said by the mover of the motion earlier, that we must follow the court procedure. Yes, I agree with that proposal, and I state that the second defect is a procedural defect. In my view, Speaker, the procedure for taking evidence and testimony by this Committee is incorrect and defective. I refer to the Committee's statement that two Honourable Members were said to be witnesses who heard the words that are material to this charge. One from Rawang, and the second from Seri Serdang. In this report, the Committee does not state when the two Honourable Members concerned were called to give evidence. There is none. So, what procedure did this Committee use to take or to accuse Gombak Setia of this charge?

The third, the third defect is the reference to the case, which in my view is not strong. In my consideration, I mention this because I was also involved in the previous case, when I was the one who made the reprimand against the Honourable Member concerned. I know, and I can say, that the reference to a case for this motion is inaccurate and irrelevant. In my consideration, this Committee refers this motion to the case of the ADUN for Batang Kali in 2017, the former ADUN for Batang Kali, as a precedent case, with permission, whereas it is not the same in terms of its content, which I will explain as follows. In that case, the words of the ADUN for Batang Kali that were material to the case were said in his speech in the House. I repeat, said, recorded in the House. The speech was recorded in the Hansard, and recorded both, audio and visual. Whereas the charge in this case, first, it is not known whether the words in question truly existed, and second, it is not known who uttered them. I refer to this motion paper, paragraph 8.1, where the Committee's report clearly states that the Committee found there was no record in the Hansard regarding this incident, there is only an audio record, of the words alleged. But no, there is no individual video recording of the person who shouted the statement. This means it cannot be verified that the words in question truly existed. And even if they existed, it cannot be known who uttered them. This means there is no exhibit. The speaker is unknown. So how can Gombak Setia suddenly be charged with committing this offence?

Therefore, Mr Speaker, I conclude that the clear defects present in this report, in this motion, are, first, the contents of this Committee's report are defective. Second, the charge of this Committee is defective. Third, the decision and recommendations of this Committee are defective. Based on these facts, ab initio, this motion is defective and should not be brought before this August House. Therefore, Sungai Ramal emphasises that Gombak Setia should not be subjected to any charge, let alone any punishment. Sungai Ramal emphasises and urges that we should not use the majority power of this House to punish an Honourable Member for the interests of certain parties. Sungai Ramal opposes. Thank you.

Deputy SpeakerEN

Sungai Ramal, please proceed. [Gombak Setia]

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Thank you, Mr Speaker, for the opportunity given to Gombak Setia to take his place in the debate on Motion No. 20 concerning the Report of the Selangor State Assembly Committee on Rights and Privileges tabled by the Honourable Member for Sentosa. I wish to refer to the incident, in which I am said to have shouted the words or term "Speaker DAP". And this evening, I wish to emphasise two important facts as to why this report should not be accepted and should be rejected by this August House.

First, Honourable Deputy Speaker, what exactly is the offence regarding the statement "Speaker DAP"? I do not feel that the statement or the term "Speaker DAP" carries a meaning that is impolite or swearing, or any nuance that could indicate that it is an uncouth matter and a matter considered capable of insulting the House, thereby violating the Standing Orders of the Selangor State Assembly and contravening the Selangor State Assembly Contempt Enactment 2009. In terms of fact, is he not a DAP member? When for me, this is not something wrong.

Second, I also wish to emphasise that the process for producing this report itself is a lopsided process.

Tuan Mohd Razali Bin SaariPAS · PNSungai PanjangEN

Sungai Panjang, may I ask a question?

Tuan Muhamad Hilman Bin IdhamBERSATU · PNGombak Setia

Yang Berhormat.

Tuan Mohd Razali Bin SaariPAS · PNSungai PanjangEN

Sungai Panjang asks, interjecting.

Tuan Muhamad Hilman Bin IdhamBERSATU · PNGombak Setia

Ya silakan.

Tuan Mohd Razali Bin SaariPAS · PNSungai PanjangEN

Sungai Panjang wishes to interject and ask: does the Honourable Member for Gombak Setia agree that the word DAP is not insulting and that there is no offence?

Tuan Muhamad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Thank you. That is why I stressed earlier, what is the word DAP, or as an example, the Honourable Deputy Speaker comes from PKR. Is PKR a word that is insulting or one that carries a nuance that could be considered insulting to the House? And I wish to refer to how I stated earlier that the process of producing this report itself is a lopsided process.

Honourable Deputy Speaker, the Honourable Chairman of the Committee on Rights and Privileges, who is the Honourable Speaker himself, at Meeting No. 1/2024, as presented earlier by the Honourable Member for Sentosa, asked the researchers to check whether this incident was true or not, and as presented earlier by the Honourable Member for Sentosa, what were the Committee's findings? The Committee found there was no record in the Hansard regarding this incident. There was no record in the Hansard, but the Committee found that there were audio and video recordings of the State Assembly sitting on the day of the incident which recorded the audio, but there was no individual video recording of the person who shouted the statement.

Mr Speaker, how was this Hansard produced? This is a matter I want to emphasise. How was the Hansard that should have been produced from the audio? The audio is there, but in the Hansard there is nothing. This is a strange matter, is it not? That is why, is there some invisible hand that erased this Hansard record? Because if the audio really exists, suddenly there is nothing in the Hansard. So, where is the basis for this charge that has been thrown at me if there is nothing in the Hansard? Then, it was stated that there is no record in the Hansard, yet there is an acknowledgement from the Honourable State Assemblypersons for Rawang, Seri Serdang and also Subang Jaya. I want to ask, first, when were these three of them called, and even if they were not called, was there any witness statement or record of them as witnesses presented to the Committee on Rights and Privileges, because this process itself is lopsided.

Honourable Deputy Speaker, in the statement or what was presented by the Honourable Member for Sentosa earlier, the evidence from the Honourable Member for Gombak Setia. Indeed, for me, I do not need to comment on such small matters, but I emphasise that procedure must be followed. I emphasise what the mandate is, what the scope is, when the Committee can be called to meet, what the parameters of the Committee are for hearing from those accused, from witnesses. Likewise the need for notice.

That is why the Honourable Member for Subang Jaya agreed, he said procedure must be followed as in the courts. Let us agree. But, if based on court procedure, are witnesses not required to be called? Or is there no need for a witness statement to establish that a person is guilty? So, that is why they said action can be taken, notice must be issued, but no notice was issued, no hearing was held. A letter was sent after a year without meeting, a letter was issued to me, I received a letter that is baseless! Baseless! Then they asked me to confess whether I stated it or not. Why should I respond to a charge as baseless as this?

Likewise, the second, they asked me to explain what intention I wanted to convey. Eh. Thank goodness the Honourable Member for Tanjung Sepat was here, the other day he said "Nawaitu sauma ghadin..". That is why, Mr Speaker, for me, such things should not be used. The majority power to oppress or to be applied to any State Assemblyperson, as long as it is not carried out properly, following the correct procedure. Let us not set a wrong precedent for the Selangor State Assembly regarding a report like this, and in the end it will be judged by the future generations of the state of Selangor. Thank you, Mr Speaker.

Dato' Dr. Ab Halim Bin TamuriPAS · PNPaya JarasEN

Speaker, I propose that this motion be withdrawn or rejected before debate, because many defects have occurred and this is to protect the name of the House. I recommend that it be withdrawn. Thank you.

Tuan Wan Dzahanurin Bin AhmadBERSATU · PNSungai Kandis

Saya sokong

Tuan Rosnizan Bin AhmadBERSATU · PNMorib

Morib setuju

Deputy SpeakerEN

But that's fine, I will return it to the House to make a decision. Let us vote.

Honourable Members, the question before the House is a Motion that reads:

Whereas, pursuant to Standing Order 76 (5), Standing Orders of the Selangor State Assembly, this August House accepts the Report of the Selangor State Assembly Committee on Rights and Privileges regarding the statement by the State Assemblyman for Gombak Setia on 24 November 2023, which was tabled in this August House as Meeting Paper Number 46/2025.

Honourable Members who agree, please say yes.

Honourable Members who do not agree, please say no.

The Motion is agreed to.

Tuan Muhamad Hilman Bin IdhamBERSATU · PNGombak Setia

Undi ya.

Deputy SpeakerEN

A vote? One person stood up, no... So... This Motion is agreed to. Huh? What? No one stood up just now. They should have.

Tuan Muhamad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Let's ask for it, lah.

Deputy SpeakerEN

Automatically just now, the answer is no. Once, once. We continue with the division. How? The Secretariat will handle it. I ask the bentara. I ask the bentara to handle counting the votes, those who agree and those who do not agree, yes. I ask the Secretariat to appoint someone to count the votes. Our Secretary, appoint one session each.. Secretary..

(Voting process in progress)

Honourable Members all. The result of the division rests in my hands.

State Assembly members who answered disagree, 17 in number.

Members (of the House) who gave agreement, 29.

The motion is agreed to.

The Honourable Member for Gombak Setia, I ask the Honourable Member for Gombak Setia to stand.

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Do I have to wind up?

Deputy SpeakerEN

Stand up. Censure of the State Assembly member for Gombak Setia. Honourable Tuan Muhammad Hilman bin Idham, Gombak Setia. The House has approved the report tabled by the Committee on Privileges and Freedoms. The Honourable Member should have stood up. The House decides that the Honourable Member for Gombak Setia, has clearly attempted to cast bad faith in the House through quoting the Honourable Member's speech of 24 November 2023.

In this report by the Committee on Privileges and Freedoms, the House is reminded of the obligation to think and review before giving a speech. The Honourable Member must also be aware that the Speaker and Deputy Speaker always act fairly in giving space and strengthening the role of the opposition, that is, the Honourable Member's own role in the governance of the Selangor State Legislative Assembly. The Honourable Member should use that right in a good way and not in this manner. The Committee on Privileges and Freedoms has carried out its duty in handling the Honourable Member for Gombak Setia's matter in accordance with the rules and powers that govern this Committee, not a political PARTI issue or any intention by the Committee to make an oppression against the Honourable Member. I hope such conduct is not repeated again by anyone in this House. Accordingly, the House formally censures the Honourable Member's action against this House and I order that this censure be recorded in the Handsard. Thank you.

Secretary of the HouseEN

Next motion. Motion number 21 of 2025. Motion under Standing Order 76(5) by the Honourable Member for Kota Kemuning.

Tuan Preakas A/L SampunathanDAP · PHKota KemuningEN

Mr Speaker and Honourable Members all. I wish to bring a motion which reads as follows: that pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House receives the Report of the Committee on Standing Orders of the Selangor State Legislative Assembly, tabled in this August House as Meeting Paper Number 47 of 2025. Mr Speaker, under Standing Order 69(3) of the Standing Orders of the Selangor State Legislative Assembly, it is the duty of the Standing Orders Committee to consider from time to time and issue a report to the House on matters relating to the Standing Orders referred to it by the House for tabling in the Third Meeting of the Second Session of the 15th Selangor State Legislative Assembly. A motion proposing amendments to the Standing Orders of the Selangor State Legislative Assembly was brought through Meeting Paper Number 25 of 2024. The motion was read and agreed to by the Selangor State Legislative Assembly on 27 November 2024, and the House referred the matters to be amended to the Standing Orders Committee as in Appendix A of Meeting Paper Number 25 of 2024, to be scrutinised before being considered for approval of the amendments by the House at the next meeting.

The Standing Orders Committee of the State Assembly, in line with the trust given by the House, held a meeting on 18 December 2024 with the State Legislative Advisor of Selangor to study and examine all the proposed amendments to the Standing Orders of the Selangor State Legislative Assembly as referred to it on 27 November 2024. The meetings of the Standing Orders Committee held on 18 December, 16 January, 11 August 2025 and 29 August 2025 prioritised the Report of the Standing Orders Committee of the Selangor State Legislative Assembly to amend the Standing Orders of the Selangor State Legislative Assembly. The committee members are as in Appendix A and the recommendations have been commented on. The comments of the Standing Orders Committee of the Selangor State Legislative Assembly on the amendments to the Standing Orders of the Selangor State Legislative Assembly 1959 are as in Appendix B. The Committee's examination found that the proposed amendments involve the following rules: Rule 36, Rule 41, Rule 67(A). Pursuant to Standing Orders 69(3) and 69(4), the Standing Orders Committee recommends the proposed amendments to the Standing Orders of the Selangor State Legislative Assembly, and these are approved in accordance with the committee's comments and recommendations as in Appendix B. Accordingly, Mr Speaker, I respectfully request to propose this motion.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Mr Speaker, I second.

Tuan Speaker.

SpeakerEN

Yes, just a moment please. Honourable Members all. This motion has been seconded, I open this motion for debate. Yes.

Mr Speaker, I rise to ask for guidance from Mr Speaker. Earlier, before Mr Speaker entered, there was an earlier motion which involved Gombak Setia regarding the action taken against Gombak Setia, this is actually important. The important matter, Mr Speaker, was when the motion was read by Kota Kemuning.

SpeakerEN

Honourable Member, this motion has no connection with the motion we are debating now. This motion is motion number 22. No connection.

Agreed. Alright, I'll go straight to that motion..

SpeakerEN

Does the Honourable Member wish to debate this motion?

Alright, because while Kota Kemuning was debating earlier, I noticed on TV, he wrote Kota Kemuning PH, then when Sentosa stood up it was also attached with the party name of the Honourable Member. The same thing happened when the Honourable Member for Gombak Setia mentioned a person's name together with a party, I wish to ask for guidance.

Tuan Muhammad Izuan Bin Ahmad KasimPKR · PHKota DamansaraEN

Speaker, Speaker.

That concerns the Standing Orders, Standing Orders.

(House in uproar)

SpeakerEN

Honourable Member, please sit down if you do not wish to debate. I ask you to sit down, this is a breach of Standing Order 36(1). Standing Order 36(1): a Member shall direct his speech only to the matter under discussion and may not raise any matter that is irrelevant. So this motion is actually for everyone's information, a motion that was passed by the ADUN Muda, the youth voice, so Honourable Kuang, if you wish to take part in the debate of this motion you are welcome, there is no problem. We will not limit the time either, so I want to ask Honourable Kuang whether you wish to take part in this motion or not, because what was read by Kota Kemening concerns TVET and so on, it has no connection with Pakatan Harapan and so on.

Tuan Preakas A/L SampunathanDAP · PHKota KemuningEN

Speaker, Speaker. That concerns the Standing Orders.

SpeakerEN

Motion 21. 21, sorry, I also made a mistake, so we are debating on the Standing Orders, the amendment to the Standing Orders that was previously moved, which includes the wording relating to the establishment of the Selection Committee and also the characteristics of the Tuan Yang Terutama of Sabah and Sarawak to be included in this debate. So I hope Honourable Kuang will follow what is being debated now. If the Honourable Member wishes to propose any amendment to the Standing Orders, it may be submitted in writing later, there is no problem, I am not sure, the Honourable Member is not a Committee member.

Thank you, thank you Mr Speaker.

SpeakerEN

That is all. Sorry Honourable Member, this motion is still under debate. If anyone wishes to debate? If there are none, Honourable Members, there is a question before this House, which reads: that pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this August House receives the Report of the Standing Orders Committee of the Selangor State Legislative Assembly tabled in this August House as Meeting Paper Number 47 of 2025.

Honourable Members who agree, please say yes.

Honourable Members who do not agree, please say no.

This motion is agreed to.

Secretary of the HouseEN

Motion Number 22 of 2025, motion under Standing Order 26(1) by the Honourable Member for Kampung Tunku.

Speaker

Ya, silakan.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Mr Speaker and Honourable Members all, I wish to bring a motion which reads as follows: that this August House proposes that the motion which was debated and received the highest votes by the ADUN Muda participants on 29 July 2025 be brought to this August House, namely urging the Selangor State Government to take steps to address educational dropout among youth in terms of financial assistance, strengthening TVET programmes and consolidating national knowledge.

Mr Speaker, first of all, congratulations to the Speaker's Office and the Selangor State Legislative Assembly Office for organising the Selangor ADUN Muda Programme, which was very robust. This year also marks history with the participation of a participant with visual impairment. Brother Muhammad Alif Muhammad Ghazali, aged 30, who used a smartphone and audio-enabled computer during the programme. I hope Brother Alif's participation becomes an inspiration and broadens the diversity of participants in the following year. Educational dropout among youth must focus on those who vanish from the system, or as we say, fall through the cracks, with permission. Those who stop schooling, those trapped in low-skilled, low-income jobs. A small minority may succeed, but in general youth who drop out have limited social mobility when they become adults, with families and children, and the cycle of poverty will repeat. There are three aspects to be debated, namely financial assistance, strengthening TVET programmes and consolidating national knowledge. On the first aspect, although the Selangor State Government is ahead with various educational initiatives, we must remember the daily reality of B40 youth. The cost of books, transport, food and drink, devices and other costs. Sharing and coordination of information among all stakeholders must be further strengthened so that at-risk youth and their families receive appropriate assistance. If eligible for BINGKAS, we register them. If there are learning problems, Anak Istimewa Selangor can help design interventions, and if digital devices are needed, we provide them. The essence is, if we want youth to keep learning, we must ensure they are able to attend school and institutions of higher learning.

Second, strengthening TVET programmes. Thank you to the Malaysia Madani government for the allocation for TVET of RM7.9 billion at the federal budget level, and an allocation of RM20.48 million at the Selangor state budget level. During the flight to Sandakan last week, I had the opportunity to chat with a young man from Gombak who is studying a Diploma in Marine Engineering Technology, a very specific field which is actually in demand, with permission, in Malaysia. In fact, TVET options have expanded in terms of diversity, and youth graduates of TVET are even able to earn higher salaries compared to professional fields. The Minister of Human Resources, Honourable Steven Sim, also sets an example by obtaining the Malaysian Skills Certificate, SKM Level 5. In addition, the amendment to the National Skills Development Act 2006 to raise SKM levels to 6, 7 and 8 so that they are equivalent to degrees and master's degrees is hoped to improve youth perception of TVET.

Third, consolidating national knowledge. Mankind constantly seeks the meaning of life. Like the title of the work by the French painter Paul Gauguin, with permission, Where Do We Come From? What Are We? Where Are We Going? Financial assistance and strengthening TVET programmes are bread and butter issues, with permission. Today I wish to present the perspective of bread and belonging, with permission. Consolidating national knowledge can give youth who are still searching for their own identity, with permission, a Sense of Purpose, a Sense of Belonging, so that they are more motivated to continue their studies, not only for personal development but so that they feel part of the community and are encouraged to devote themselves to the people of Selangor and the nation of Malaysia. Kampung Tunku begs to propose.

Mr Speaker, I second.

SpeakerEN

Honourable Members all. This motion has been seconded, I open this motion for debate. Yes, Batu Tiga.

Thank you, Honourable Member. I would like to take just a little time to debate briefly on the motion from the ADUN Muda. I think this is a very good thing that this motion has been read out or raised by the ADUN Muda, and the ADUN Muda are also concerned about educational issues in the state of Selangor, and I congratulate the Selangor government for successfully implementing several very good initiatives. I wish to touch on only two points regarding two articles. One is on TVET, in an article in Utusan Malaysia on 23 July 2022. TVET is the pathway for students who have dropped out, where that situation has begun to shift, and today TVET is no longer the second choice for young people in Malaysia. Furthermore, a statement from the Ministry of Education (KPM) in the following year also cited that, based on data, the dropout of secondary school students has decreased since 2019 while participation in TVET has increased. I think these two points, or these articles, can be considered by us, and in fact TVET has become a good option among young people, and I hope the ADUN and ADUN Muda members will bring more issues to the sittings of this House in future so that they will also be raised as an agenda for the state of Selangor. That is all for now, thank you, I second.

SpeakerEN

If there is any winding up by Dato Menteri Besar, you are welcome.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Batu Tiga, and also Kampung Tunku and those who seconded. I take note of several matters, and indeed this year we are increasing efforts for technical and vocational education. One of them is the programme for secondary schools which we will begin launching next year, where the introduction of TVET is not only after they have dropped out and entered university, but they are guided to enter TVET from the very early stage. Second, regarding financial assistance support, of course we are diversifying funds to reach secondary schools through the Selangor Foundation (Yayasan Selangor), through several programmes organised by Yayasan Selangor, no longer focusing as before, that village children move to towns, schools, there is there is hostel. Instead, we go to the schools, take them, make them foster children, do the Hyper programme, because certain programmes help students to achieve excellence. So education is an important foundation in state development, and it is reflected in a large allocation, an increase of up to 55 million next year.

SpeakerEN

Honourable Members all, the matter before us is a motion which reads as follows. That this August House proposes that the motion which was debated and received the highest votes by the ADUN Muda participants on 29 July 2025 be brought to this August House, namely urging the Selangor State Government to take steps to address educational dropout among youth in terms of financial assistance, strengthening TVET programmes and consolidating national knowledge.

Honourable Members who agree, please say yes.

Yes, Honourable Members who do not agree, please say no.

This motion is agreed to.

Motion to Adjourn the HouseMotion

Secretary of the HouseEN

The next item of business is a motion to adjourn the House.

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Speaker, and also Honourable Members all. The session of this House is nearly over, after we have gone through several debates, before I conclude the debate session or the third sitting session this time, to meet again, God willing, next year. Here I wish to record congratulations to the Most Honourable Datuk Seri Anwar Ibrahim, having completed three full years as Prime Minister of Malaysia, who has brought Malaysia forward with a good name and has also brought success such as the increase in the value of the ringgit. Second, I wish to update on the state flood situation. So far we have opened 14 PPS involving more than 1,000 people, and God willing from tomorrow I, we will announce several support and assistance measures after examining developments occurring across the state of Selangor, which is also affected together with several other states including Kuala Lumpur, as the monsoon rains have caused the incidents that occurred. God willing tonight several EXCO members will go down to the PPS to see for themselves what has happened, and tomorrow we will hold a special briefing on how we want to deal with it, and I wish you all a safe return to your respective constituencies, and please inform us if any support needs to be provided, especially in facing the floods and also the disasters that have occurred. Thank you, Honourable Members, Speaker. I propose that this sitting be adjourned.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I second.

SpeakerEN

Honourable Members, before I adjourn this sitting today, I take this opportunity to extend my sincerest thanks to all the Honourable Members of the State Assembly, the Heads of Department, and the Government Officers for the cooperation extended in smoothing the proceedings of the third meeting of the Third Session. My thanks are also extended to the Secretary and Assistant Secretary of the House, the secretariat, the reporters and all officers involved, directly or indirectly, for the commitment and sincerity of everyone in ensuring that the proceedings ran smoothly. To all Honourable Members once again, I urge you to check the draft minutes that have been and will be circulated in relation to the speeches of all Honourable Members, and to return them to the House administration if there are any corrections, so that the official record can be prepared and circulated to all Honourable Members at the earliest opportunity. At the same time, I also request that the journey home and the movements of Honourable Members in their respective constituencies will always be smooth, and that on your way home you drive carefully on the roads, as the weather conditions are rather dangerous and unpredictable. I hope that all my colleagues can provide the best service to all the people in their respective constituencies. With that, the House is adjourned.

(THE HOUSE ADJOURNED AT 7.40 PM)