(Opening)

Mr SpeakerEN

The Honourable Member for Ngemah.

Terima kasih, Tuan Speaker.

Construction of Tar Sealed Road Connecting Kanowit to Kapit

(73) YB Encik Alexander Anak Vincent bertanya kepada Menteri Pembangunan Infrastruktur dan Pengangkutan.

(a) What is the status of the construction of the tar sealed road between Ng. Ngungun (Kanowit District) to Ng. Temalat (Song District) which is part of the road connecting Kanowit to Kapit?

(b) When the road is expected to be completed and can be used by the public?

Datuk Dr Jerip Anak SusilPBB · GPSJunior Minister of Transport · Mambong

Terima kasih, Tuan Speaker. Terima kasih, Ahli Yang Berhormat daripada Ngemah. For the information of the Ahli Yang Berhormat for Ngemah, the progress of the road construction between Nanga Ngungun to Nanga Temalat is 7.4% which is on going now that is actual, again the schedule of 8.9%. Even though there is a slight delay of 1.5%, this is still between schedules as long it is less than 10% so it is not considered as delay.

The other part of the question is that this road shall be expected to be completed around 2021, by August, 2021 and this is the missing link, the road which is from Sibu to Kapit and we hope that we shall be able to open it to public by August 2021.

Thank you, Assistant Minister. I have two supplementary questions.

(a) I want to know how much is the cost of the construction of such road?

(b) How long does it take for the contractor to complete the job within the scope of the tarsier road which was already started since the beginning of this year?

Thank you.

Datuk Dr Jerip Anak SusilPBB · GPSJunior Minister of Transport · Mambong

Terima kasih Ahli Yang Berhormat daripada Ngemah, terima kasih Tuan Speaker. The total contract sum is RM79.076 million all and all. Now the period of construction is about 30 months, we have started sometimes in February this year and we hope as I have answered just now hopefully that shall be completed by August 2021.

Thank you.

Mr SpeakerEN

The Honourable Member for Piasau.

Thank you, Tuan Speaker.

Status of Miri Permy 3 Housing Project

(74) YB Datuk Sebastian Ting Chiew Yew bertanya kepada Menteri Kerajaan Tempatan dan Perumahan.

(a) In April 2013, Miri Permy 3 was officially launched by the Yang Amat Berhormat Chief Minister. Now five years had passed, what is the present status of this project?

(b) Does the Government have any plan to build more affordable houses for Miri in the next two years?

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Housing and Public Health · Nangka

Thank you very much, Tuan Speaker and also to Ahli Yang Berhormat for Piasau. For the information of Ahli Yang Berhormat, the Permy 3 is located at Kuala Baram in Miri. The Sarawak Planning Authority has approved this project on the 10th of November in the year 2016 and the bid for the allocation of fund from the Federal Government was put into the Third Rolling Malaysia Plan 11th, however, Tuan Speaker, it was rejected. Therefore, there is no other plan to build this house, this 278 houses in Permy Jaya. However, we are trying to bid again for the next couple of years.

Thank you very much.

Thank you very much Yang Berhormat Assistant Minister. I have two supplementary questions. Before I go into that, affordable housing is in one of my Manifesto in year 2016. I hold Manifesto is very important. Something you tell the people that this is what I would like to do for the next five years. I would not want to depart so my two supplementary questions, Yang Berhormat, is:-

(a) How much is the estimated funding required to complete 278 units of Rumah Mampu Milik at Miri Permy 3?

(b) What are the other development components approved under this project

Thank you.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Housing and Public Health · Nangka

Ahli Yang Berhormat dari Piasau, the cost for these 278 houses at Permyjaya was proposed us about RM50 million. I congratulate you to put this one of your Manifesto. And I think you should work together with the MP for Miri who has announced that 8,000 houses will be built in Miri. I do not know where he got the fund from whether it has been approved or not by KPKT but it’s to good to ask him whether this 8,000 units houses which he had declared on 13th August this year on Borneo Post that the Ministry of Housing Malaysia will built one billion houses in the next five years which is about 200,000 units and he is asking for 10% of that in Miri. I wish him good luck.

And for the second part of your questions, there are few things that will be built at Permyjaya.

(a) The normal terrace house 549 units and there is also commercial area which consist of the hypermarket as well as the wet and the dry market.

(b) And the other community amenities that going to be planned in Permyjaya.

Thank you. Permy 3. Sorry.

Mr SpeakerEN

The Honourable Member for Tamin.

Thank you, Mr Speaker.

Upgrading of Water Treatment Plant at Pakan Stapang

(75) Honourable Ir Christoper Gira Anak Sambang asked the Minister of Utilities. The upgrading project for the water treatment plant at Pekan Stapang is still at the design stage. When will this project be tendered?

Datuk Liwan LagangPRS · GPSDeputy Minister of Water Supply · BelagaEN

Thank you, Mr Speaker. For the information of the Honourable Member for Tamin, this project has received approval from the Ministry of Rural Development (KPLB) to be implemented. Consulting engineers have been appointed to carry out the design work. KPLB requires that several key processes, such as the Value Management Lab and the Value Engineering Lab, be carried out first before the tender for the project can be called.

Mr Speaker, I have two supplementary questions.

(a) What is the total number of new users who will enjoy treated water supply from this project?

(b) When will the longhouse residents along the road from Selangau to Pekan Arip be supplied with treated water?

Datuk Liwan LagangPRS · GPSDeputy Minister of Water Supply · BelagaEN

Thank you, Honourable Member for Tamin. For the information of the Honourable Member for Tamin, the total number of houses that will enjoy treated water supply is 335 doors once this project is fully completed.

However, for the second question, I believe and am confident that the answer to this question has already been provided by the people of Selangau themselves, and we have submitted this application to the Ministry of Rural Development under the 11th Malaysia Plan for consideration. It is up to my good friend, the MP for Selangau, who is also the Minister of Public Works, to help bring this matter forward, because I understand and I am confident that he also wants the people of Selangau to enjoy treated water supply like this.

Honourable Member for Tamin, I rest assured that our friend will help every day together with the Minister of Rural Development every time we meet, I believe, in the Federal Cabinet where it will be raised.

Thank you.

Mr SpeakerEN

The Honourable Member for Jemoreng.

Thank you, Mr Speaker.

Assalamualaikum, good morning. Brush your teeth, go down and exercise, Sarawak State is shining ever brighter. My question is number seventy-six.

Rights of the State of Sarawak Contained in MA63

(76)

What steps have been, are being and will be taken to ensure that the rights of the State of Sarawak as contained in MA63 are promptly restored, and what is the time frame for this process, given that the State Government and the Federal Government are administered by two different parties?

Rights of the State of Sarawak Eroded in MA63

(112) Honourable Encik Johnichal Rayong anak Ngipa asked the Chief Minister: What steps has the Sarawak State Government taken to ensure that the rights of the people and the State of Sarawak eroded in the MA63 agreement are restored?

Puan Hajah Sharifah Hasidah Binti Sayeed Aman GhazaliPBB · GPSJunior Minister of Law, Federal-State Relations and Project Monitoring · SamariangEN

Thank you, Honourable Member for Jemoreng, for the question and also for the pantun. Good morning to all, everyone is radiant.

For the information of the Honourable Member for Jemoreng and also for Engkilili, since the questions raised by both Honourable Members are related, allow me to answer them together.

Mr Speaker

Soalan mana?

Puan Hajah Sharifah Hasidah Binti Sayeed Aman GhazaliPBB · GPSJunior Minister of Law, Federal-State Relations and Project Monitoring · SamariangEN

Question 112, Engkilili.

Mr Speaker

Sila.

Puan Hajah Sharifah Hasidah Binti Sayeed Aman GhazaliPBB · GPSJunior Minister of Law, Federal-State Relations and Project Monitoring · SamariangEN

The State Government previously held meetings and discussions with the previous Federal Government to ensure that the rights of the State of Sarawak are restored. As a result of these meetings and discussions, several matters have been agreed by both parties, including matters relating to the review of special grants to the State of Sarawak and the drafting of the Gas Distribution Ordinance 2016.

On 16 September 2018, as we all know, Prime Minister Tun Dr Mahathir bin Mohamad announced that the new Federal Government would restore the partner status of the States of Sarawak and Sabah as enshrined in the Malaysia Agreement 1963 once the review of the Malaysia Agreement 1963 is completed.

As we all know and as was discussed yesterday, a Steering Committee chaired by the Prime Minister, Tun Dr Mahathir Mohammad, has been established to review and coordinate the Malaysia Agreement 1963 as a whole, including matters relating to oil royalties and the development of Sabah and Sarawak. Among the matters that the Sarawak Government has asked to be included in the agenda of this Steering Committee are greater autonomy and additional financial resources to be given to Sarawak. This Steering Committee has a period, so they say, of six months to carry out the review. This is what they say.

The State Government of Sarawak will be represented by the Honourable Chief Minister and also the Learned State Attorney-General of Sarawak. The Sarawak Government has also written a letter to the Honourable Prime Minister that, for the purposes of this Steering Committee, the composition of representation should follow the inter-governmental committee model in which the parties involved are represented equally and not lopsided. As we all know, only yesterday this State Legislative Assembly unanimously supported the establishment of a consultative committee to deliberate and for us to discuss matters that we will bring to the negotiating table. That is all, thank you.

(Supplementary Question) Thank you to the Honourable Deputy Minister, who is radiant in appearance and always striving to ensure that the rights of the State of Sarawak are achieved. Mr Speaker, we welcome the proposal of the consultative committee resolved by this House yesterday on the MA63 session. We also wish to record our thanks to Tun Mahathir for his speech in Kota Kinabalu on the last Malaysia Day. With that spirit, I have 2 supplementary questions.

The first is what has been achieved in the discussions with the previous Federal Government, and what are the plans for discussions with the Central Government that carries the new Malaysia slogan? We are afraid that everything will be renamed.

The second question is what action will and can be taken if there is a breach of the requests of the Sarawak State Government to the Central Government, where those requests are in line with the contents of the Malaysia Agreement 1963. Thank you.

Puan Hajah Sharifah Hasidah Binti Sayeed Aman GhazaliPBB · GPSJunior Minister of Law, Federal-State Relations and Project Monitoring · SamariangEN

Your supplementary question is rather long, Honourable Member for Jemoreng. I will try to answer it. In fact, the discussions with the previous Central Government have been held, and there have indeed been some achievements. Together with the previous Federal Government, we held discussions in two phases.

The first phase was discussions on administrative devolution, namely administrative devolution of powers. The second phase, the one we are in now, is the devolution of our rights under the Constitution, such as oil and gas rights, as well as financial review and so on. For the previous administrative devolution, 13 matters were agreed to be devolved to the State of Sarawak. Among these matters are, for example, the number of teachers from among Sarawak's children raised to 90% in 2018, and I'll mention just two or three. The Sarawak State Government is to be referred to in drafting any Federal Legislation relevant to the State of Sarawak, all projects to be implemented in the State of Sarawak must be referred to the State of Sarawak, and many more matters that have been agreed to be devolved to the State of Sarawak. Honourable Member, perhaps I can give these matters to you in writing later, and for the second question just now, we will try our utmost to ensure that everything that has been promised is paid and delivered. We will make every effort to do our best, however, if there is any breach, I feel we must sit down, we have a Consultative Committee now and we can discuss and see what the next action will be that we will take, but it must be remembered that all these negotiations must be conducted in the context of a Malaysian nation. Within the Malaysian spirit.

Thank you, Honourable Member.

Mr Speaker, allow me to ask two questions. My question is number 112. Thank you, Honourable Deputy Minister. Although my question is far back, you have kindly agreed to answer my question. This is one example.

Puan Hajah Sharifah Hasidah Binti Sayeed Aman GhazaliPBB · GPSJunior Minister of Law, Federal-State Relations and Project Monitoring · SamariangEN

Yes, thank you.

Your face looks even more radiant this morning. One question: when did the process of negotiation and discussion regarding this matter begin? Second, what are the main matters that will be discussed?

Thank you, Honourable Deputy Minister.

Puan Hajah Sharifah Hasidah Binti Sayeed Aman GhazaliPBB · GPSJunior Minister of Law, Federal-State Relations and Project Monitoring · Samariang

Terima kasih for all your nice words Yang Berhormat Engkilili. Bila proses rundingan, I think we are ready anytime. We are ready whenever the Federal Government is ready. I think we are very prepared on our part, we know what we are going to ask for seperti Yang Berhormat Kota Sentosa kata semalam, apa yang kita hendak minta. What is it that we want from Malaysia Agreement. Actually we are ready with what we want to ask for from the Federal Government. Jadi perkara-perkara yang hendak dibincangkan seperti kita semua maklumlah, seperti termaktub hak-hak kita yang terhakis, yang termaktub di dalam Perlembagaan Persekutuan dan hak-hak kita di bawah Perjanjian Malaysia 1963.

Sekian, terima kasih.

Mr SpeakerEN

The Honourable Member for Opar.

Dato Ranum Anak MinaBEBAS · BNOparEN

Thank you, Mr Speaker.

Decline in Selling Prices of Agricultural Produce

(77) Honourable Dato Ranum Anak Mina asked the Minister of Agricultural Modernisation, Native Customary Land and Regional Development. Is there any initiative from the Ministry to curb the decline in the selling prices of agricultural produce such as rubber, black pepper and palm oil, in order to avoid continuing losses to estate operators as well as smallholders and farmers?

Datuk Roland Sagah Wee InnPBB · GPSJunior Minister of Native Customary Land Development · TaratEN

Thank you, Mr Speaker. Thank you, Honourable Member for Opar. I don't need to pedal all the way to Opar, I can use a car. For the information of the Honourable Member for Opar, the prices of agricultural commodities such as rubber, black pepper and palm oil are influenced by production and demand for the commodities in the global market, as well as competition from the prices of substitute commodities. Among the initiatives that have been implemented by the Government to curb the decline in the selling prices of certain agricultural produce are:

1. Establishing floor prices.

For rubber, the Government has introduced the Rubber Production Incentive (IPG) since November 2015 to help smallholder rubber planters. Under this incentive, if the price of rubber falls below the floor price of RM2.20 per kilogram, the Government, through the Malaysian Rubber Board (Lembaga Getah Malaysia, LGM), will finance the price difference and pay that difference to the farmers concerned.

2. For pepper commodities, among the measures taken by the Malaysian Pepper Board (Lembaga Lada Malaysia, MPB) are:

(a) Promoting domestic consumption of pepper, such as participating in exhibitions, organising market promotion programmes and encouraging the development of value-added pepper products such as garlic pepper, black pepper marinade, black pepper sauce, pepper-flavoured biscuits and so on, especially in the downstream sector. This effort aims to increase domestic demand for pepper and will directly have a positive effect on pepper prices;

(b) Production of premium pepper at estate level

Encouraging pepper planters to produce premium-quality pepper such as White Cream Pepper (LPK) and Export Quality Pepper (LBE) so that pepper planters can obtain a more lucrative return compared with producing raw materials.

(c) Direct sales to niche markets ("Niche Market")

Due to high production costs, Malaysian pepper faces difficulties in competing directly in the raw material market with other producing countries such as Vietnam and Indonesia. To increase the competitiveness of the Malaysian pepper industry, MPB has introduced several value-added pepper products at factory level, such as Sterile Pepper (Mikrokleen) and pepper powder for markets that place greater emphasis on food safety and quality, and premium products at estate level such as White Cream Pepper. So far, MPB has succeeded in penetrating the markets for value-added pepper products and premium pepper in Japan, Sweden, South Korea, China, Taiwan, Hong Kong, Spain and others. These markets are able to pay higher prices than raw material prices.

(d) Increasing R & D (Research and Development) in the pepper industry to diversify pepper-based products so that the Malaysian pepper industry remains competitive and relevant in the international pepper market.

3. For palm oil commodities, the Malaysian Palm Oil Board (MPOB) has implemented several strategies and programmes to ensure that oil palm cultivators receive reasonable income in an economic situation that is still challenging. These include:-

(a) The Livestock-Palm Integration Incentive Scheme and the Crop-Palm Integration Incentive Scheme, which aim to generate additional income sources for smallholder oil palm planters;

(b) Holding discussions and direct visits to major importing countries of Malaysian palm oil, such as the European Union and China;

(c) Increasing domestic consumption of palm oil through increasing the blending of palm-based biofuel with petroleum diesel under the B7 Programme, namely a blend of 7% palm biodiesel and 93% petroleum diesel, starting November 2014. The Government is also planning to increase domestic consumption of palm products through the implementation of the Biodiesel programme from B7 to B10 in the near future. This aims to reduce palm oil stocks and thereby have a positive impact on the price of crude palm oil (CPO);

(d) Strengthening existing export markets and penetrating new markets for palm-based products, such as the 'niche market', to obtain higher market value;

(e) Increasing research and development activities in producing new products and adding value to downstream commodity products; and

(f) Complying with international standard requirements through the Malaysian Sustainable Palm Oil Certification Scheme (MSPO), which will be made mandatory on 31 December 2019 and which will open wider market access in importing countries.

The Sarawak Department of Agriculture (Jabatan Pertanian Sarawak), together with the relevant Government agencies, has also:

(a) Diversified crops and agricultural activities through an integrated farming scheme. Farmers have been advised to cultivate at least two types of crops as a safety net against the decline of any one commodity being cultivated; and

(b) Encouraged farmers to produce high-quality products with best practices so that they can penetrate markets and remain competitive on a continuous basis in the global market.

Dato Ranum Anak MinaBEBAS · BNOparEN

(Supplementary Question) Thank you, Deputy Minister. Mr Speaker, I have two supplementary questions.

(a) What is the total number of farmers who have claimed the Rubber Production Incentive, and what is the value of claims in the Opar state constituency (DUN)?

(b) What are the criteria for claiming this Rubber Production Incentive?

Thank you.

Datuk Roland Sagah Wee InnPBB · GPSJunior Minister of Native Customary Land Development · TaratEN

Thank you, Mr Speaker. Thank you, Honourable Member for Opar.

For the first supplementary question, the answer is that so far only 48 farmers have applied for this IPG, with a total claim value of only RM11,253. We encourage more people to register, if there are still many rubber tappers.

And for the second question, for the information of the Honourable Member for Opar, the Government, through the Malaysian Rubber Board (LGM), has implemented the IPG for smallholders nationwide since November 2015. In Sarawak, IPG matters are managed by the Sarawak Department of Agriculture with the assistance of the Malaysian Rubber Board (LGM).

Smallholders are only eligible to apply for IPG after registering with the Sarawak Department of Agriculture and having a PAT-G card. The type of card, and their claims can be made at the nearest Department of Agriculture office with the support of the sales receipts for the rubber where they sold it.

Thank you.

Mr SpeakerEN

The Honourable Member for Layar.

Encik Gerald Rentap JabuPBB · GPSLayarEN

Thank you, Mr Speaker.

A rooster crows atop the coop, many Iban children at the long school, the fire of the lamp has no shadow, ask me about number 78.

Status of Schools Still Using Generators

(78) Honourable Encik Gerald Rentap Jabu asked the Minister of Education, Science and Technology Research. What is the status of schools such as SK Ng. Lawih that still use generators even though they are close to the 24-hour electricity wire connection?

Dr Haji Annuar bin Rapa’eePBB · GPSJunior Minister of Technology Education and Research · Nangka

Thank you very much Ahli Yang Berhormat for Layar.

Mr SpeakerEN

Honourable Member, call out the name.

Dr Haji Annuar bin Rapa’eePBB · GPSJunior Minister of Technology Education and Research · Nangka

Nak nemu jakok. (laughter) Nemu mimit jak.

Ahli Yang Berhormat, the number of schools in Sarawak that is still using genset in other word is not connected to the grid is 357. On the 26th of July this year, our Right Honourable Chief Minister during the Teacher’s Day celebration in Betong has announced to use RM50 million of the State fund to connect 113 schools which include the school of SK Nangga Laweh and Lesu. We have not connected it yet because we are still waiting for the consent from the Ministry of Education.

For your information, our Minister has written a letter to the, Federal Minister on the 8th of August this year and it took him two and half months to reply, which was only replied on the 24th of October asking; number one, whether that RM50 million is a grant to the Ministry of Education. It is not a grant to them, it is our money that has been committed by the State Government to help 113 schools. They also asked whether there’s obligation of this fund. We have told them and replied one week later and now we are waiting for them to give us a consent to connect all these 113 schools to the electricity supply.

Thank you very much.

(Soalan Tambahan) Terima kasih, Menteri Muda atas jawapan itu. Sebenarnya itu sememangnya my second supplementary question, mungkin Menteri di Persekutuan itu masih memikir apa warna kasut untuk tahun depan. Itu lama dia tak reply. Just for the information of Yang Berhormat Menteri Muda dan Dewan yang mulia ini, semasa krisis itu tadi dimana genset tidak ada minyak saya sendiri dari pusat khidmat; tiga kali menghantar minyak supaya bekalan elektrik tidak terputus untuk anak-anak kita.

So with that Tuan Speaker, I have two supplementary questions.

(a) What is the scope of work actually that involves connecting this because currently this is already connected to the gen set but I believe if the electrical are here you need to change the wires again and that would involve cost, what is the cost involve?

(b) If there is 357, the answer and you answered already Assistant Minister, what are the other things that can be done apart from just only giving electricity to them, you need to have maybe computer or so on you know, that can be supplied to these schools.

Thank you very much.

Dr Haji Annuar bin Rapa’eePBB · GPSJunior Minister of Technology Education and Research · Nangka

Thank you very much Ahli Yang Berhormat for Layar.

For the connection to this schools which is called SK Nagga Laweh/Lesu. The amount of cost of this project is RM233,500. It will be implemented by the Sarawak Energy Berhad, if it’s been given consent by the Ministry of Education.

For the other question that been asked, off course the grid is the best way to supply electricity continuously to the school. We do agreed that there is a hiccup here and there for the supply of diesel with several schools in the whole state of Sarawak currently but now it has been taken over partly by the Divisional Education Office. So, if there is are problem of the supply diesel to schools which still need diesel to supply electricity we can always call the Pegawai Pendidikan Daerah to ask for help. I hope this issue will settle soon because there is some legality as well as contract involved in this issue.

And for the second part of the question, whether we should supply computers, of course that is the way forward, for the 21st century education. That’s why recently the Deputy Minister of Education announced that they want to use e-book or digital book so that the students would not have to carry heavy begs. That will be the best way. But the basic needs of electricity supply have to be addressed first before we go further to give e-books to the students particularly in the State of Sarawak.

Thank you very much.

Mr SpeakerEN

The Honourable Member Encik Ali Anak Biju, Krian.

Encik Ali Anak BijuPKR · PHKrianEN

Thank you, Mr Speaker.

Number of "Timber Licences" or "Provisional Leases"

(79) Honourable Encik Ali Anak Biju asked the Minister of Urban Development and Natural Resources. How many "Timber Licences" or "Provisional Leases" have been or will be issued, or withdrawn, following the amendment to the Rang Undang-Undang Kanun Tanah 2018?

(109) Honourable Dato Henry Harry Anak Jinep asked the Minister of Urban Development and Natural Resources. With the new Amendment Bill to the Sarawak Land Code which was introduced in the last August sitting, can the Ministry update when the said amended Bill can be made effective?

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

Thank you, Mr Speaker. Thank you, Honourable Member from Krian. The rooster is crowing from Krian. I will answer question 79.

Allow me, Mr Speaker... (laughter)

Mr SpeakerEN

What's all this crowing about? (laughter)

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

To answer question 109 together, from the Honourable Member from Tasik Biru.

Mr Speaker

109?

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

109. For the information of the Honourable Members for Tasik Biru and Krian, the Land Code (Amendment) Ordinance, 2018 was gazetted under Chapter A179 on 3 August 2018. However, the date of enforcement of the ordinance will be determined by the Minister responsible after the Land Rules are approved by the State Executive Council (MMKN). At present, the Land Rules are still in the process of being prepared before they can be finalised for further approval.

Thank you.

Encik Ali Anak BijuPKR · PHKrianEN

(Supplementary Question) I have only one supplementary question. When is it expected to be effective, and when is it to be implemented?

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala Rajang

Terima kasih, Tuan Speaker. Terima kasih, Ahli Yang Berhormat dari Krian. The process of getting it more effective, first process is to get the ordinance, Land Code Amendment Ordinance to be gazetted, which we have done on the 3rd of August 2018. The next process is to prepare the land rules supaya proses-proses untuk menjalankan NTD, Native Territorial Domain ini dapat dilaksanakan di lapangan. So as soon as, after that once the thing is completed then we have to bring it to cabinet for it to be approved. So as for the time line, I cannot give you the time line but as much as we would like to do it as fast as we could.

Thank you very much.

Dato Henry Harry JinepPDP · GPSTasik Biru

(Supplementary Question) Tuan Speaker, thank you to Assistant Minister for the reply. I have two supplementary questions but before that let me open the floor first. A week or two after our Amended Land Code 2018 being approved by the Dewan, there is an NGO group came to Redeem Singai Bau to do something like a simple road show to tell the rakyat that this is the kind of what we call land bill that have been approved. And one very particular statement that they made, they said NCR land is just like our wife. Do we need permission to make love with our wife? Now, mana boleh kita umpamakan bini kita dengan NCR land? Betul tidak? To own a wife you have to get married go to registration with JPN and get a proper certificate. Betul tidak? And then, tanah ini kita bagi pada anak kita, generation kita. Wife mana boleh bagi. Bolehkah? Ini punya fikiran saya tak fahamlah. Tak masuk akal langsung.

Jadi, supplementary question saya Assistant Minister:

(a) Bila mahu buat road show ini?

(b) Bila lagi mahu buat penjelasan kepada rakyat?

Thank you.

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala Rajang

Terima kasih, Ahli Yang Berhormat dari Tasik Biru. Yah, you cannot equate land with wife but then again that is something that we need to address. As regard to the road show seperti yang saya telah jelaskan tadi kita akan buat road show setelah land rules ini dapat kelulusan daripada Kabinet MMKN dan we would like to do it as soon as possible. And in the road show the Land and Survey staff will explain the procces, procedure yang betul mengikut undang-undang tertentu supaya tidak menjadi pertikaian di lapangan.

Dari segi pertelingkahan dalam lapangan ia akan berlaku. No matter what. What we want to do is to explain to all the local people that the process and procedure mengikut undang-undang supaya kita tidak akan menghadapi masalah-masalah seperti yang akan dibuat oleh sebahagian daripada NGO-NGO yang tidak bertanggungjawab untuk menghasut rakyat. Only yesterday I did mentioned about dari Ba’kelalan mentioning that you don’t have to survey the land, just imagine if you don’t survey the land for NCR, for NTD, you just can imagine the chaos yang akan berlaku di lapangan. Oleh sebab itulah, kita mahu Dewan Undangan ini, YB-YB Dewan Undangan ini untuk menjelas sebaik-baiknya peraturan-peraturan yang tertentu untuk memastikan kita tidak menghasut rakyat untuk membencikan Kerajaan dalam menjalankan tugas untuk memastikan tanah-tanah adat bumiputra ini akan diuruskan secara yang terbaik. Sekian, terima kasih.

Mr Speaker

Ahli-ahli Yang Berhormat, you cannot equate land with wife because land is immovable and wife is moveable. Yang Berhormat Encik Miro Anak Simuh, Serembu.

Encik Miro Anak SimuhPBB · GPSSerembu

Terima kasih Tuan Speaker and you can have four actually.

Tourism Project on Mount Serembu and Brooke Heritage Site

Ikan lampan di dalam buluh, Soalan saya nombor 80.

(80) YB Encik Miro Anak Simuh bertanya kepada Menteri Pelancongan, Kesenian, Kebudayaan, Belia dan Sukan. Will the Sarawak Government take over the tourism project on Mount Serembu and Brook Heritage site worth RM1.6 million and allocate the said budget as this project is one of the potential tourism products that can lure tourist to Sarawak?

Datuk Lee Kim ShinSUPP · GPSJunior Minister of Tourism, Arts and Culture · Senadin

Tuan Speaker, terima kasih kepada Ahli Yang Berhormat bagi Serembu. Tuan Speaker, for the information of Ahli Yang Berhormat for Serembu, the tourism project for Serembu and Brook Heritage was one of the project identified to be implemented 2018 under the Third Rolling Plan of the 11th Malaysian Plan and with Federal funding. However, this project which cost RM1.6 million and since been put on hold pending revision of priority by the Federal Government. My Ministry has already taken up the matter with the Federal Ministry of Tourism, Arts, and Culture on the status of the project and currently awaiting for the response.

Encik Miro Anak SimuhPBB · GPSSerembu

(Supplementary Question) Thank you Yang Berhormat Assistant Minister. May I ask two (2) supplementary question?

(a) What is the reason behind the on hold of this project by the Federal Ministry and will your Ministry seeks the funding from State Government to continue in the middle of the project?

(b) What are the components of the project?

Datuk Lee Kim ShinSUPP · GPSJunior Minister of Tourism, Arts and Culture · Senadin

Thank you, for Ahli Berhormat for Serembu. As I have said just now, my Ministry have pursue this matter with the Federal Ministry of Tourism, Arts and Culture and we probably hope that the Federal Ministry will not cancel the project as the estimated costs is only RM1.6 million. Mount Serembu is also known as a Mount Penghijau has an interesting historical background. It was home to the earlier settlement or Serembu Bidayuh some 300 years ago while on a walking visit to Siniawan and Bau. Sir James Brooke was said to have been attracted by the Bidayuh longhouses for the mountain top facing Siniawan and between 1848 and 1850 with the help of the villagers there Brooke built a cottage arch bumuan located just above their settlement. I certainly agree with the Ahli Yang Berhormat for Serembu as stated in his original question that it is a potential tourism product. In the event, but it is cancelled by Federal Ministry we certainly will look at possibility of funding the project by our Sarawak Goverment.

On your second supplementary question, the main component of the proposed project consists of:

(a) The tourism information centre; (b) Souvenier shop; (c) Handcraff gallery; (d) Lookout point; and (e) Upgrading of the bamboo bridge, boat walk and climbing stage, resting house, signage and a public toilet and lastly also include landscaping.

Thank you.

Mr SpeakerEN

The Honourable Member for Tanjung Datu.

Datuk Amar Hajah Jamilah AnuPBB · BNTanjong DatuEN

Assalamualaikum warahmatullahiwabarakatuh. Good morning.

From Rambungan to Tanjung Datu, My Question 81.

Improvement of the Digital Telecommunications System in Tanjung Datu

(81) Honourable Datuk Amar Hajah Jamilah Haji Anu asked the Chief Minister. In line with the Digital Economy and the improvement of the digital telecommunications system in rural areas, particularly in the N.3 Tanjung Datu area, what are the Government's plans to improve these facilities in Tanjong Datu?

(92) Honourable Encik Safiee bin Haji Ahmad asked the Chief Minister: In line with the State Government's efforts to improve communications facilities, particularly broadband (internet) services in rural areas, how many telecommunications towers will be built in the DUN Daro area and where are their locations?

Encik Abdullah Bin Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · SemopEN

I will answer Question 81 together with Question 92 from the Honourable Member for Daro. The matters raised by these two Honourable Members relate to telecommunications coverage in Sarawak. In the State Government's efforts to ensure that telecommunications networks, especially towards rural areas, have good coverage, particularly those that will involve, as the Deputy Minister mentioned just now, electricity and so on. This is an important infrastructure that must be among the State Government's agenda towards the digital economy. This allocation of RM1 billion is a State allocation that shows our seriousness in ensuring that this communications network reaches, especially, towards rural areas.

To answer the question raised by the Honourable Member for Tanjung Datu, it is true that the Sarawak Multimedia Authority (SMA) will work with various agencies, including the Malaysian Communications and Multimedia Commission (MCMC) at the Federal level and also the Sarawak Forestry Corporation, to improve telecommunications facilities, especially in areas that are attractions in the Tanjung Datu area. And for everyone's information too, not only for the Honourable Member for Tanjung Datu and the Honourable Member for Daro, to all 82 Honourable Members in this House, SMA, through a letter dated 5 June 2018, has requested all people's representatives to provide information on the situation in their respective areas that have telecommunications system problems, or where there are towers that may have problems, such as the lines sometimes being cut off and so on. Such information is very important to ensure that SMA functions well, and also very important for SMA to liaise with the telco companies concerned, such as Celcom, DiGi and Maxis, to ensure that the equipment in place is in good condition and functioning, because in certain circumstances equipment placed at these towers has been stolen and so on.

For the Honourable Member for Daro, there are 14 existing structures in the DUN Daro area, and SMA has taken the initiative to use State allocation to build 4 new tower structures, namely in the Rh. Kedi area, the Rh. Balibu and Rh. Buyu areas, Rh. Damu and Rh. Kap, and Kampung Nyamuk. Any supplementary questions?

Datuk Amar Hajah Jamilah Haji AnuPBB · BNTanjong DatuEN

(Supplementary Question) I have two supplementary questions, namely:

(a) What is the total number of towers planned in the Tanjung Datu area? And the second question is, if we look at it now, the Pan Borneo road that passes from Teluk Melano to Sematan is upon completion. So naturally I want to ask whether priority is given to the areas covered, which are tourist attractions, from Teluk Melano to Sematan, is priority given, because we know that is the only area that attracts tourists, especially as mentioned earlier upon completion of this Pan Borneo Teluk Melano Sematan, because I know we must give credit to our State Government, because we have voiced it, that from the beginning we gave priority to that area.

(b) Does it also cover other areas that are given as tourist attractions, such as the Pueh area, Kem Pueh, Gunung Gading and so on? I know that at this time we already have [it] at Talang-Talang.

So, that is my question.

Encik Abdullah Bin Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · SemopEN

I am ready to hear two supplementary questions, if any, from the Honourable Member for Daro. I can answer them together.

(Supplementary Question) Thank you, Mr Speaker, and thank you to the Honourable Deputy Minister for the answers given. I have two supplementary questions.

(a) As informed earlier, there are four telecommunications towers that are being and will be built. In connection with that, I want to know when all these projects are expected to be completed?

(b) Apart from the new towers, my area also has existing towers, and I want to know how many existing telecommunications towers have been upgraded in terms of internet speed or capacity, or their coverage, from 3G to 4G.

Thank you.

Encik Abdullah Bin Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · SemopEN

Referring to the matter raised by the Honourable Member for Tanjung Datu, the focus area for this telecommunications infrastructure is not only towards tourist attraction areas but also towards areas with economic potential, interior areas that have the potential to be developed in terms of aquaculture and agriculture, because telecommunications involves many economic aspects of the state, especially in upgrading the socio-economic status of each area. This connectivity system is also related to education and so on, regarding information and so on.

To the Honourable Member for Tanjung Datu: three new towers will be built in the Tanjung Datu area, three new towers estimated to be worth RM6 million, but that depends on the assessment of the final inspection of the site and many other technical matters. Apart from that, for the tourist areas that will be the focus of these structures, the coverage will be towards areas such as Pugu Beach, Pulau Talang-Talang, Tanjung Datu National Park and several other areas. However, we appreciate it if the Honourable Member for Tanjung Datu and the other Honourable Members can provide information from time to time about places where telecommunications structures or infrastructure need to be developed.

For the information of the Honourable Member for Daro, for these four towers, the tender has been issued, by the end of this month, and hopefully the construction of these four towers will be completed by December. Work will begin at the end of this year, and completion is probably within three months, probably by the end of the first quarter next year, the completion of these new four towers.

Also, other information raised by the Honourable Member for Daro concerns the upgrading from 3G to 4G of several towers in the Daro area. For the information of the Honourable Member for Daro, Maxis has two towers there. One of them has been upgraded to 4G, the other will be done by the end of November, and another is on air, sorry, and the other tower is being upgraded. That is Maxis. For DiGi, the information given is that one tower has been upgraded and will undergo the upgrading process towards 4G, hopefully completed by the end of December this year. And Celcom has five towers, and all five towers are on air, already completed and fully 4G for Celcom. The meaning of "on air" here (OA) is that it has been functioning as 4G, but again it is in the process of upgrading this telecommunications radio by these telcos. Again, the cooperation of all people's representatives is greatly appreciated by SMA if, from time to time, there are disruptions and so on, as this is very important in the process of upgrading all telco radios throughout the state of Sarawak.

Thank you.

Mr SpeakerEN

Honourable Member for Bukit Semuja.

Encik John Anak IlusPBB · GPSBukit SemujaEN

Thank you, Mr Speaker.

Total Number of Welfare Assistance Recipients for the Serian Area (82)

Honourable Encik John Anak Ilus asked the Minister of Welfare, Wellbeing, Community, Women, Family and Child Development: What is the total number of welfare assistance recipients for the Serian area at present, by category of assistance, and what are the trends in applications and approvals over the same period?

Datuk Francis Harden Anak HollisSUPP · GPSJunior Minister of Community Well-being · SimanggangEN

Thank you, Mr Speaker.

For the information of the Honourable Member for Bukit Semuja, the number of welfare assistance recipients for the Serian area up to October 2018, by category of assistance, is 3,336 persons with total expenditure of RM9,771,150 million, covering the receipt of Child Assistance (BKK), 645 persons with total expenditure of RM1,399,800 million, Old Age Assistance (BOK), 1,519 persons with total expenditure of RM 5,275,900 million, Disabled Workers' Allowance (EPC), 88 persons with total expenditure of RM325,800, Assistance for Care of Persons with Disabilities, Chronically Ill and Bedridden Patients (BPT), 123 persons with total expenditure of RM431,650, Assistance for Persons with Disabilities Unable to Work (BTB), 400 persons with total expenditure of RM161,950, and General Assistance (BA), 561 persons with total expenditure of RM1,176,050.

Applications for welfare assistance received for the Serian area from January to October 2018 total 450 cases. Of this total, 330 cases have been approved for assistance. The assistance schemes approved are Child Assistance (BKK), 36 cases, and Old Age Assistance (BOT), 114 cases, Disabled Workers' Allowance (EPC), 12 cases, Assistance for Care of Persons with Disabilities, Chronically Ill and Bedridden Patients (BPT), 25 persons or 25 cases, and Assistance for Persons with Disabilities Unable to Work (BTB), 21 cases, and General Assistance (BA), 117 cases, and Youth Assistance (BBB), 5 cases.

Mr SpeakerEN

Honourable Members, question time is up. Any supplementary questions?

Encik John Anak IlusPBB · GPSBukit SemujaEN

(Supplementary Question) Thank you, to the Deputy Minister just now. I recall I missed a supplementary question. So, anyway, thank you for the answers. I have two supplementary questions here, namely:

(a) What are the conditions for obtaining the welfare assistance mentioned earlier?

(b) What is the ethnic breakdown of welfare assistance recipients for the Serian area?

Thank you.

Datuk Francis Harden Anak HollisSUPP · GPSJunior Minister of Community Well-being · SimanggangEN

Thank you, Mr Speaker. For the information of the Honourable Member for Bukit Semuja, the main conditions for monthly welfare assistance are:

(a) Malaysian citizen;

(b) Family income does not exceed the current poverty line income, namely RM990 a month; and (c) Persons who are unable to afford it and are in need.

So, for the answer to the second supplementary question: the number of welfare assistance recipients for the Serian area up to October 2018 is 3,306 persons. Of that total, 2,235 are Bidayuh, 536 Iban, 338 Malay and 209 Chinese, 17 other ethnicities and 1 Melanau.

Mr SpeakerEN

Honourable Members, question time is up.

DEBATE ON THE SECOND READING – APPROPRIATION BILL (2019), 2018 AND MOTION TO REFER THE DEVELOPMENT ESTIMATES RESOLUTION FOR EXPENDITURE FOR THE YEAR 2019

Mr Speaker

Ahli-ahli Yang Berhormat, the question is that The Supply (2019) Bill, 2018 be read a second time and the motion to refer The Resolution on the Development Estimates 2019 be referred to the Committee of Supply.

Ahli-ahli Yang Berhormat, three days that is today, tomorrow and Friday are set aside for members to debate on The Supply (2019) Bill, 2018 and the motion to refer The Resolution on the Development Estimates 2019.

Under Standing Order 31(8), I hereby impose 20 minutes for any member who wishes to speak today. Honourable Member for Kota Sentosa.

Encik Chong Chieng JenDAP · PHKota Sentosa

Thank you, Tuan Speaker.

Tuan Speaker, before I begin my debate on the budget tabled by Yang Amat Berhormat the Chief Minister, I just like to make an observation of what transpired just now. I think a very distasteful joke has been made equating wife to property. Such archaic and disrespectful mentality ought to change and such comments be it jokes or otherwise, be it moveable or immovable, ought not to be uttered in this House. Wives are our partners in life and they are not to be deemed as properties. I hope members from GPS can reflect on this comment. Thank you. I will start with my debate on the budget.

This budget has been termed as the largest budget in the history of Sarawak, with an additional extra income of RM3.9 billion that will be coming from the imposition of sales tax on petroleum products. Here the orders made under the State Sales Tax Ordinance 1998 states that there will be 5% tax on crude petroleum oil, natural gas, liquefied natural gas, urea and bla bla bla so on and so on.

Tuan Speaker, though it is good that the government has found an extra source of income but my question here to the Finance Minister is how, from where this income will be derived. This imposition of 5% sales tax on this petroleum product would it be like something happened to the 4D lottery ticket, whereby in West Malaysia it is sold at RM1.00. But in Sarawak you have additional RM1.10 whereby Sarawakians were made to pay extra 10 cents to the State coffer for buying lottery tickets because of the State Sales tax.

Two days ago, Yang Amat Berhormat announced that sales tax is going to be imposed. The State sales tax is going to be imposed on the petroleum products. This will have far reaching impact. It will increase the cost of production for petroleum. It will affect the long term supply of liquefied natural gas contract between PETRONAS and Japan. It will impose additional cost of production for urea which is a key ingredient for the production of fertilizer.

And this 5% sales tax will also be imposed on lubricating oil and lubricating greases which will be applied to motor vehicles. All these will increase, will affect, will have far

reaching effects in business world, into our economy. It will affect consumers. It will affect the industry players. It will affect the agriculture sector and it will affect transport sector.

And has the State Government done a thorough study on how this tax is going to affect our Sarawak industry? There are two possibilities that I can foresee. At the end of the day, we pay more. Sarawakians might be made to pay more for this tax. Either that or industry players, our economy will be badly affected. And, Tuan Speaker, collection of tax comes with responsibilities. If you can use the money properly, I think a lot of Sarawakians will be willing to pay tax. But, the way the State Government is using our money, 15 much to be desired.

I just take one example on the dilapidated schools that was repeatedly mentioned by the Member from Tebedu, the Honourable Minister in charge of Education in our State. In fact, this dilapidated schools issue was created, has been there for a long time. For a long time. And that is as a result of the neglect by the Barisan Nasional Government on Sarawak over the past 55 years. … (Interruption)

Tuan speaker: You take?

Encik Chong Chieng JenDAP · PHKota Sentosa

Never mind, you sit down.

Tuan Speaker, in January 2016 the then Prime Minister Dato’ Seri Mohd Najib bin Tun Haji Abdul Razak pay a visit to Sarawak and found out that there are six (6) rural schools in Sarawak that need refurbishment and he announced, he approved the budget, RM2 millions for each school. Implementing the IBS system, I don’t know how the project from transpire but it was RM2 millions for each school. And then, later on 1 ½ year later, 2017, June 1st, Honorable Member from Tebedu made a press statement saying that there were 1,020 dilapidated schools in Sarawak with 415 classified as critically in dilapidated condition. Then he was also suggesting that we are to combine some of these dilapidated schools together.

Then he also asked for funding to be given by the Federal Government to repair or rebuild these dilapidated schools. The estimate was RM4 billions to repair or rebuilt these 415 dilapidated schools. That is RM10 million per school, RM10 million per school and on the 28 October 2017, RM1 billion was announced. I think Honorable Member from Nangka was in the press conference as well. RM1 billion was announced but the cost of repair suddenly went up double; it became RM20 million per school. I think the Member for Nangka would remember what he said in the press statement, I have the press report here.

You can reply through your Minister later. He said, he claimed that RM1 billion is only enough for 50 schools i.e. RM20 million per school and, my time is limited. Thank you. I would not give clarification unless Tuan Speaker can extend my time. Can or not?

Mr Speaker

Proceed, proceed.

Encik Chong Chieng JenDAP · PHKota Sentosa

Proceed. Proceed; he doesn’t want to extend time. That was on October 28, the cost of repair of dilapidated schools went up to RM20 million per school and this year, July 18, after 10 months it’s still 415 critically dilapidated schools in Sarawak, it’s still 415 but it was announced that two (2) schools will be relocated and rebuild. That is:

(a) SK Ulu Segan, Bintulu (b) SK Maludam, Betong The cost to relocate or rebuild these schools, RM40 million per school, RM40 million per school, for SK Ulu Segan, Bintulu, RM40.1 million was announced; SK Maludam,

Betong, RM48.2 million. And if you look at our budget this year, for this year there will be RM20 million each for these schools who could be space out into two (2) years but my question is that: in 2016, it was estimated RM2 million per school to refurbish, to rebuild these schools. It went up to RM10 million, it went up to RM20 million and now is RM40 million and do you know the number of students in these schools? For SK Ulu Segan Bintulu there is only 200 over students, less than 250 students.

Mr Speaker

Okay, I give you extra time.

Point of order here.

Mr Speaker

Okay.

Dr Haji Annuar bin RapaeePBB · GPSJunior Minister of Education and Research and Junior Minister of Housing and Public Health · Nangka

Thank you very much Tuan Speaker. The calculation that has been mentioned by Yang Berhormat for Kota Sentosa has misled the House. He cannot divide the number of allocation by the number of schools. Different schools have different amount needed. If you equate, then why Sarawak only got RM4 billion and the rest got RM271 billion from these present budget. If you want to divide equally like that, it does not make sense. Certain areas need more, certain areas need less. This should be the way, it’s a common sense. Don’t mislead without common sense.

Mr Speaker

Okay.

Encik Chong Chieng JenDAP · PHKota Sentosa

Yang makan cili rasa pedas. Tuan Speaker, SK Ulu Segan Bintulu has only 240 students, does it justify spending RM40.1 million to build a schools? We know, we want, all of us want development for education, best education for our kids but don’t treat project to build schools as your ATM machines, to milk cash from these projects and that is why Tuan Speaker, we have a new Government now, a new Government who stressed on transparency integrity and no colonialism in the implementation of Government projects.

Tuan Speaker, it is also very puzzling for me to hear from Honorable Member for Tebedu to read from his press statement in 2017 that, June 2017, that there were 1,020 dilapidated schools where 415 are critically dilapidated school. That was June 2017. Alright and two days ago when Yang Amat Berhormat Chief Minister presented the budget, same numbers were presented in this House. 1,020 dilapidated schools with 415 critically dilapidated schools, this is the same figures for the past 1 ½ years. What has been done?

Tuan Speaker, yes, Pakatan Harapan has taken over the Federal Government. I would not give way to him. Tuan Speaker, Pakatan Harapan has taken over the Government only in May but what happen from July till April, as well as I understand RM500 million has been allocated and disbursed to the State and but why, why as on November 2018, there is still the same figure. You guys are just playing out the figures, June 2017, 415 critically dilapidated schools, 2018 November still the same figures. What have you been doing?

Mr Speaker

Order, order.

Encik Chong Chieng JenDAP · PHKota Sentosa

Tuan Speaker, Tuan Speaker, I move on to the third issues that is the proposed construction of the second trunk road and the coastal road prospect costing approximately of RM11 billion as announced by Member from Baleh, initially it was supposed to be awarded to two contractors only, but I intervene lodge a report to MACC and at the end of the day it went into open tender and was divided to 11 packages, that is good. However, subsequently, there is another huge project, huge package of project under URDA (Upper Rajang Development Authority) whereby there are 20 packages of road to be

constructed and 15 packages of water supply projects, worth one point something billion however only three consultants were appointed to oversee the whole implementation of these packages of projects.

Tuan Speaker, there are plenty of consultants out there who are qualified. In Sarawak there are about more than 50 consultants who can and able to undertake large projects but why confined to only three consultants. And if you look at all these projects, State projects mind you, State projects under the Ministry of, I think JKR for the State, State JKR not the Federal, State JKR, same names keep popping up for the supervision or implementation of the projects. There should be site investigation into this matter.

And Tuan Speaker, I was also inform, I was verbally informed by the industry players that even when the Government Agency conduct the open tender the agency can also read the open tender. How it was done, how it was done let me enlighten you, Tuan Speaker this is about the implementation of water supply project by the JBALB (Jabatan Bekalan Air Luar Bandar). Tuan Speaker, here is what I was quote. This is about the calling for tender …(Interrupted)…

Mr Speaker

You have two minutes left.

Encik Chong Chieng JenDAP · PHKota Sentosa

Pardon.

Mr Speaker

You have two minutes left. That is point of Order.

Encik Chong Chieng JenDAP · PHKota Sentosa

It was lump sum contract, several lump sum contracts being publish to call for open tender for the supply of water in the rural area, but from the date when the tender was open till the submission date is only one month, one month, it’s almost impossible for most of the consultant to carry out a proper evaluation of the value to be, to submit for the open tender by having restricting the period of this calling for tender, the time period, in fact only those who has prior notice or knowledge of this tenders can submit tenders. So, I call on the Government to be to be more, to practise more accountability, transparency and integrity in the implementation of projects. Especially given that now we have the largest, largest budget in the history of Sarawak.

Tuan Speaker, since I’m, given so little time, I’ll just finished off two other points. Number one, there’s a lot of arguments, a lot of allegation that the Federal Government is cutting out or stopping the federal projects that have been promised by the then Prime Minister, Dato’ Seri Mohd Najib bin Tun Abdul Razak. I have checked with the Treasury Department there are basically two categories of such projects that have been stopped or cancelled or kept at bay, there are:

(a) Those projects have no fund, there’s no fund, it just announce hot air, empty promises by the Dato’ Seri Mohd Najib bin Tun Abdul Razak; and

(b) Those project who which are over inflated, over inflated projects, whereby it is not justifiable to implement such project.

So this is basically two projects that have been cancelled or postponed.

Another point is about the implementation of the LRT, the suggestion of proposal of the LRT project light rail transit project... (Interruption)...

Mr Speaker

Your time is up.

Encik Chong Chieng JenDAP · PHKota Sentosa

Okay, I finish this point. Alright, it was that I’m glad that the Yang Amat Berhormat has announced that this project will be postponed. I hope this project will be cancel. But meanwhile, before the cancellation of this project a lot of the land alongside the proposed route of this LRT routes has been imposed with Section 47 and thereby affecting right of the land owners. Some of them the lease of the land title expired in five years, 10 years. They applied for extension of leasehold was rejected. These are the prime land, along the roadside. I think, I call upon the Government to uplift the Section 47 affecting this land to allow them to renew their leasehold and on the hydrogen fuel cell bus, just like to question on the visibility of hydrogen fuel cell bus. How much per bus? A few million? Are the Government has spend one hundred million? A few million or I’m asking you, you are the Government and the Government spend one hundred million building the plant to provide the hydrogen fuel.

Mr Speaker

Is this in the budget?

Encik Chong Chieng JenDAP · PHKota Sentosa

Yes.

Mr Speaker

Did the Chief Minister’s say it in the budget?

Encik Chong Chieng JenDAP · PHKota Sentosa

He is going to spend the Government money. Tuan Speaker, the debate on budget you don’t have to confine everything that was said in the budget.

Mr Speaker

Did he say it Honourable Member?

Encik Chong Chieng JenDAP · PHKota Sentosa

And Tuan Speaker, one last point, there are complaint that Sarawak did not get sufficient allocation of fund in the Federal Budget if you look at the absolute figures of the development budget, we get RM10 million more than last year Tuan Speaker. And this is given the constrain face by the Federal Government resulting from the poor and bad financial management from that Barisan Nasional under the leadership of Datuk Seri Mohamad Najib bin Tun Abdul Razak whereby the Sarawak GPS are partners in crime... (Interruption)...

Mr Speaker

Okay.

Encik Chong Chieng JenDAP · PHKota Sentosa

The Federal Government has to refund RM35 billion of tax money to the tax payer and this were... (Interruption)...

Mr Speaker

Honourable Member, you conclude.

Encik Chong Chieng JenDAP · PHKota Sentosa

And this were appropriated by the... (Interruption)...

Mr Speaker

You conclude.

Encik Chong Chieng JenDAP · PHKota Sentosa

I will conclude. This RM35 billion of supposed refund tax was misappropriated by the previous Prime Minister as revenue and that was done with the consent and condone of the Sarawak Barisan Nasional the GPS. You have helped to create the mess… (Interruption…)

Mr SpeakerEN

Okay, okay, order.

Chong Chieng JenDAP · PHKota Sentosa

That is the country is facing.

Mr SpeakerEN

Okay, order, order. I call upon the Honourable Member for Layar.

Terima kasih, Tuan Speaker. Memang hangat...(laughing) I also don’t know what to say whether he is Sarawakian or not. Tuan Speaker, not referring, in jest, in jest.

Mr Speaker

I didn’t hear that.

I’m not referring to you.

Mr Speaker

I didn’t hear that. Proceed.

Tuan Speaker, Terima kasih memberi saya peluang untuk berbahas mengenai ucapan belanjawan bagi tahun 2019 yang telah dibentangkan oleh Yang Amat Berhormat Ketua Menteri merangkap Menteri Kewangan dan Perancangan Ekonomi Sarawak.

Saya bagi pihak rakyat kawasan N.36 Layar dan rakyat Sarawak amnya, ingin merakamkan terima kasih kepada Yang Amat Berhormat Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Ketua Menteri Sarawak yang telah membentangkan Bajet 2019 yang amat inovatif dalam membesarkan aliran pendapatan (our revenue) Kerajaan Negeri dan seterusnya membiayai peruntukan untuk pembangunan di seluruh negeri Sarawak. Ini menunjukkan keikhlasan beliau dan Kerajaan GPS untuk menjaga hak, merancang pembangunan dan modal insan serta kesinambungan kesejahteraan rakyat Bumi Kenyalang tercinta.

This budget is historic for many reasons:

(a) Biggest ever budget in Sarawak’s history – more than RM10 billion;

(b) Over 67% is set aside for rural development; and

(c) As an overall budget, it is a surplus budget, and not financed by our reserves.

Such rural focus and people centric budget will spur economic opportunities and activities through enhancing basic infrastructure especially water, electricity, road, bridges telecommunication towers and repairing dilapidated schools. This will be further strengthened by digital and internet connectivity to enable internet of things as a platform for modernization approaches in agriculture, management, service delivery and our daily lives.

On this note, on behalf of the Layar Constituents, I would like to thank Yang Amat Berhormat Ketua Menteri and Menteri Kewangan for specifically allocating development funds for Jalan Ijok/ Teguyu/ Batu Pesok/ Rantau Layang in the 2019 budget. I would like to also support the construction of the Batang Lupar Bridge linking Sebuyau to Triso and onwards to Meludam. It is my hope that the GPS Government also to consider linking Tanjung Assam road to Beladin/ Meludam road and further on to the vital coastal road network towards Kuching for the greater benefit of the people.

Tuan Speaker, this budget will propel Sarawak towards a high income and developed State by 2030. There are six strategic thrusts to achieve:

(a) Development biased and rural focus budget;

(b) State development agenda;

(c) Digital economy as pillar of economic expansion;

(d) Investment driven economic growth;

(e) Private sector as engine of growth; and

(f) An effective delivery system.

To achieve this, I believe the real back burner and driver for this aspiration and Sarawak’s success in the future will be the youth of Sarawak. In today’s dynamic world, it is the ability to be innovative and marketing these ideas through digital technology and enterprise will create economic opportunities and growth. The ever evolving world scenario will see changes in the traditional office work environment into a mobile or home office culture. The way of doing business also changes through advancement in e-payment systems such as e-wallet and other forms of crypto currencies. We need to equip our society with such knowledge and readiness to tap into this new economic model.

Memandangkan banyak belia yang ingin menceburi diri dalam bidang perniagaan dan perusahaan tetapi menghadapi banyak kekangan seperti modal kewangan dan sebagainya, terutamanya fresh graduates, maka saya ingin mencadangkan Kerajaan Negeri Sarawak untuk menubuhkan Tabung Pembangunan Belia Sarawak sebagai venue untuk mendapatkan dana permulaan melalui micro credit atau micro financing untuk semua anak Sarawak yang di bawah umur 40 tahun.

Tabung ini bukan saja dapat membantu dengan kewangan tetapi juga memberi perkhidmatan membimbing anak muda untuk merancang pelan dan model perniagaan, menepati jadual pembayaran dan memantau prestasi mereka. Tabung ini juga dapat memberi peluang kepada mereka untuk menjadi usahawan era digital. Dengan adanya tabung sedemikian, semua lapisan belia Sarawak yang berbilang bangsa dapat meningkatkan daya saing dan peluang perniagaan bukan sahaja di negeri ini tetapi di pasaran dunia melalui e-commerce. Peserta yang terlibat juga dapat menggunakan network ini untuk menambahkan pasaran jualan dan perkhidmatan mereka.

Strengthening Agricultural Development

Agriculture remains the mainstay of rural economy and modernization approaches have shown leaps in production. It is important that training in agro technology must be intensified to achieve these goals. I would like the government to set up a university campus status training center in Betong in view of the implementation of Bukit Sadok agropolitan area. Opening up of taman kekal makanan also provide opportunities for our youths to venture into agriculture.

It is in the youth that we can harness and utilized the usage of digital technology to its fullest advantage. I welcome the budget of RM315 million to leapfrog our state as the food basket of Malaysia and opening the market to the world using digital economy.

Social Security Net

Tuan Speaker, I would like to thank Yang Amat Berhormat Ketua Menteri and the GPS Government initiative in introducing the RM1000 endowment fund for every new born Sarawakian from 1st January 2019 onwards. This will guarantee them a certain amount of money by the time they turn 18. From my experience such monetary benefit will greatly help students who will want to pursue their tertiary studies thereon. Their parents will not be burdened or being left with no option to let their children enter universities of colleges. If they choose a commercial route, this then can be their start up capital for business ventures as they choose.

It is also in my hope that all Sarawakian upon reaching this age and wanting to continue studying be given automatic Yayasan Sarawak bursary to further help their financial commitments. Thus they can continue to excel with their studies, and after all these are our greatest assets to ensure a brighter and smarter future for Sarawak.

Tuan Speaker, Sekarang saya ingin menyentuh tentang beberapa isu dari kawasan saya dan juga berlaku di kawasan lain.

(a) Dadah dan pusat perjudian.

Drug menace and illegal gambling is still a major problem, although I must admit to reading of more raids and operations throughout the State. I urge the Government to strictly enforce actions within their agencies jurisdiction, like the local council, Polis DiRaja Malaysia, AADK and so on.

(b) Local Councils.

I have always find that local council has always been inadequately funded and shortage of manpower. For example, Majlis Daerah Betong has no budget to repair their leaking roof. I urge the Government to increase their funding and manpower requirement to these vital agencies. We must also look into a good working condition for our civil service.

I urge also the Ministry of Local Government and Housing also to plan to move our rubbish dump in Lidong to another suitable site and to build an integrated rubbish incinerator centre to cope with the growing population and environmental standards.

(c) Housing Loans.

I would like to urge the Ministry of Housing to consider giving out more loans especially to rebuild new longhouses and kampong houses. A better home will compliment the Government efforts in supplying basic infrastructures such as electricity and clean water.

(d) Utilities Fund.

I would like to urge the Ministry of Utilities to look into the assistance to new longhouses with regards to them moving their electrical meters and water meters from their old site to their new longhouse site. Similarly, for the upgrading of transformers to meet increasing demands. Generally, this is too costly but if it is not done properly it can cause overloading or other dangerous negative consequences. It is also my hope that the Ministry also provide funds for rewiring those longhouses that have been connected by electricity for more than 10 years. The recurring incident of fire because of short circuit and so on has been very worrying.

(e) Education.

Nothing that the results in rural schools are not improving especially in English, Maths and Science. I would like the Ministry of Education, Science and Technological Research to provide reading materials to schools and also retraining sessions and seminars for the teachers. We need to bring a new life into these teachers so that the students will be more interested in learning.

Select Committee

Tuan Speaker, yesterday’s sitting saw a historic unanimous decision for the august House to establish a Consultative Committee to look into safeguarding and reclaiming our rights as equal partners under MA63.This committee will listen to the voices of the people and set clear resolutions for our Yang Amat Berhormat Ketua Menteri and Sarawak’s representative to negotiate at the Federal Steering Committee level. This is the spirit of unity to show that we love and care for the State.

Tuan Speaker, the destiny of Sarawak can only be determined by Sarawakian. The Pakatan Harapan Federal budget is heartless to say compare to our State 2019 budget. To be treated as equal partners, Sarawak should have her equal share. Our budget is not hot air and is genuinely thought about; collecting through sales tax empowered by the State Laws and Federal Constitution, neither is the GPS Government chickening out of any negotiations on MA63, with the formation of the Consultative Committee, we are actually cocking in, lebih mintis enggau lebih mintih kitai diatu.

Let it be a lesson, we are only 2.8 million people in Sarawak against 30 million (9.3%) and the rest of the world, two cabinet representatives out of 55 member cabinet, that is only 3.6%, where is the equality. Ni enda jadi burung gagak seduai tu di Malaya. Help us to safeguard and develop Sarawak. After all you and I both swore in this august House to protect the Constitution and Rights of Sarawak. Sarawak First. Sayang Sarawak. Jaga Sarawak.

Let us unite for Sarawak and support the Sarawak GPS Government’s sincere and courageous effort in developing Sarawak, caring for the well being of her citizens and ensuring a harmonious and prosperous State.

As my ending note Sir, I would like to wish all of us here a very Merry Christmas and a Happy New Year 2019. God bless.

Tuan Speaker, with that I beg to support.

Deputy SpeakerEN

Honourable Member for Daro.

Thank you, Mr Speaker. Assalamualaikum Warahmatullahi Wabarakatuh. Salam Sejahtera and Salam Ibu Pertiwiku.

Thank you, Mr Speaker, for giving me the opportunity to also take part in debating the Rang Undang-Undang Perbekalan (2019), 2018, which was tabled by the Right Honourable Chief Minister of Sarawak and Minister of Finance on 5 November 2018 last.

On behalf of the people in N.43 Daro, I would like to record my highest congratulations and thanks to the Right Honourable Chief Minister and Minister of Finance for tabling a budget that is very historic, not only because it involves the largest allocation but also because it is the best so far. A budget that prioritises development, especially for rural areas, that truly gives priority to development for the welfare of the people. As Sarawakians, we should be proud to have a Government that is very caring and prioritises development for the people. An allocation of RM9.073 billion out of RM11.914 billion, that is 76%, for development, most of which focuses on accelerating rural development to reduce the development gap between urban and rural areas.

This clearly proves that the GPS Government keeps its promises and is not merely rhetoric. A budget that focuses on rural development, especially on infrastructure and basic amenities in rural areas, has proven that the claim by the opposition that the Government has neglected development for rural residents is not true at all. Indeed, that large amount clearly shows the State's financial capacity to finance various development projects, thereby empowering the socio-economy of the people, especially in interior and rural areas. With that financial capacity, it clearly proves that the best financial governance is being implemented by the Sarawak Government, thereby keeping the State's economy firmly on a strong footing.

Mr Speaker, this year's budget proves that the State Government always prioritises the interests of the people through consistent plans and policies, while ensuring that development projects in rural areas can be implemented more effectively in order to guarantee the welfare of all the people.

This is a budget that is very inclusive and gives emphasis to various issues and forms part of the effort to support the State's economic growth. Of course, within the framework of Budget 2019, the State Government is not seeking popularity but rather is showing a very responsible and realistic attitude.

There is no point in promising something that cannot be implemented, mere empty promises to seek popularity. Proposing something that sounds pleasing is indeed very easy, but can it fulfil all those promises? We are well aware that during the last 14th General Election (PRU Ke-14), Pakatan Harapan promised to allocate 30% of development allocations to Sarawak, but what has happened today is far off the mark. All talk and no action.

The difference between the state budget and the federal budget is also like the difference between heaven and earth, where the federal Government's budget is very general and still vague, compared with the state budget which is much more detailed. Indeed, we can see for ourselves that a large part of the state budget focuses more on rural areas, including providing an allocation of RM81.7 million to rebuild and repair dilapidated schools in this State, even though education is under the jurisdiction of the Federal Government.

Mr Speaker, now allow me to raise several issues that require the attention of this august House, especially those that involve my constituency of N.43 Daro.

Establishment of the Coastal Area Development Agency

Mr Speaker, the approach implemented by the State Government under the leadership of the Right Honourable Chief Minister to accelerate infrastructure development in a planned and orderly manner, especially in the interior rural areas, through the establishment of three agencies, namely the Upper Rejang Development Agency (URDA), the Highland Development Agency (HDA) and the Northern Region Development Agency (NRDA). Therefore, in order to achieve balanced development throughout the State, especially in rural areas, it is also proposed that a similar agency be established for the coastal rural areas, which may be known as the Coastal Area Development Agency (CADA). Residents of the coastal areas, which make up nearly a part of the people of this State, still have some who have yet to enjoy basic amenities such as roads, electricity, water supply and several other basic infrastructure.

The Problem of Soil Erosion at SK Batang Lassa, Daro

Mr Speaker, SK Batang Lassa is one of the primary schools in the Daro State Assembly area that is currently threatened by a serious soil erosion problem. The location of several buildings is rather dangerous because they are too close to the eroded river bank. What worries me is that this school is a boarding school. If no proactive efforts are carried out in the near future by the Ministry of Education to overcome this problem or to relocate the school to a safer location, then we do not want an incident of a school falling into the river to happen again, which could endanger the lives of the pupils studying there.

The Agriculture and Fisheries Sector

Mr Speaker, the agricultural sector cannot be separated from the lives of the people in rural areas. Therefore, this year's budget, which continues to focus on the agricultural sector, is very much welcomed. Therefore, I would like to suggest that the Ministry of Modernisation of Agriculture, Native Land and Rural Economy, through the Sarawak Department of Agriculture, encourage the commercial cultivation of crops with high potential, among them such as MD2 pineapples and bananas, especially in the coastal areas of Sarawak, since both of these fruits now have an extensive market overseas. In addition, this is also important so that idle land can be turned into capital to develop the economy of coastal areas.

Mr Speaker, meanwhile, the fisheries sector is one of the main occupations of coastal communities, including in Daro. This sector is also a contributor to the country's economic growth and development. Therefore, I hope that in the State Government's budget, attention will also be given to fishermen, including the categories of river fishermen and sea fishermen. The State Government is also requested to be committed to implementing appropriate initiatives to help look after the welfare of fishermen throughout the State, including providing various assistance, whether in the form of equipment or skills training, since the present Pakatan Harapan Government pays less attention to fishermen.

Establishment of an Agricultural Produce Collection Centre

Mr Speaker, I would like to propose to the Government that an Agricultural Produce Collection Centre be established in Daro. This is not only because the area is suitable for the agricultural sector but also because of its strategic location in the coastal area covering Matu, Igan, Pulau Bruit and Paloh, and in the middle of the SCORE development corridor. Pekan Daro, which has long existed as a collection and distribution centre, can be made a nucleus to develop and drive the economy of the coastal areas of Sarawak, especially with the completion of the construction of the Muara Lassa and Batang Paloh bridge projects later on.

Village Expansion Scheme and People's Housing Scheme

Mr Speaker, I request that the village expansion schemes that have been approved in Daro, namely:

1. The Lemang Pek/Kampung Tengah/Kampung Pangtray Village Expansion Scheme Phase 1 and Phase 2, totalling 536 lots approved since 2002;

2. The Kampung Badong Village Expansion Scheme Phase 1 and Phase 2, totalling 331 lots approved since 2003; and

3. The Kampung Masjid/Kampung Panchor/Kampung Baru Village Expansion Scheme Phase I and Phase II, totalling 446 lots approved since 2015,

be implemented as quickly as possible because many people need house lots to build their homes.

I also propose that eligibility for applications for these lots be opened to all the people of Daro, not only restricted to the villages concerned. This is so that any applicant who truly needs a house lot will have the opportunity to build a house and so that they can avoid building squatter houses.

Affordable Housing

Mr Speaker, one of the matters that has been given attention in the recent budget is the provision of affordable housing or special housing for those with low incomes. In this regard, I request the State Government to implement the Affordable Housing (RMM) and Spektra Permata Housing (RSP) projects on several lots of the Village Expansion Scheme and People's Housing Scheme that have been approved in the said Daro District, so that these low-income groups can also afford to own a quality and comfortable house.

Small Industrial Estate and Entrepreneur Centre

Mr Speaker, in line with the state industrial programme that continues the implementation of various industrial estates, I would like to propose that a small industrial estate or entrepreneur centre also be built in Daro. The Daro district has the potential to have factories built for small-scale industry as well as entrepreneur centres for rent or sale to entrepreneurs, to enable them to expand their businesses to a higher level, including in the cottage industry sector. Several facilities such as an RC Wharf worth nearly RM5 million have already been completed this year, and will certainly provide facilities for all transportation and delivery of goods by river or sea. Likewise, with the completion of the Muara Lassa and Batang Paloh bridge projects later on, connectivity to the nearest towns, including to the Tanjung Manis Port, will become easier. Accordingly, I call on the relevant Ministry to give serious consideration to this application.

Rural Electricity Supply

Mr Speaker, I request that the State Government continue to implement the Rural Electricity Supply Project Scheme, or better known as RES, even though the Federal Government under Pakatan Harapan, through the Ministry of Rural and Regional Development, no longer channels allocations to the State Government for this purpose. In my constituency, there are still 25 settlements consisting of longhouses and villages, and about 35% of the area under the N.43 Daro State Assembly seat still has not received electricity supply. Accordingly, once again I request that the RES project that has been implemented in the Stubah area, in the Meradong district, at present be also connected to Rh. Ujang, Sg. Mawan and Rh. Franchis Kiyai, Ng. Singat, whose distance is only a few kilometres from the existing grid line. Likewise, for the RES project to Sebedil that is currently being implemented, it should also be connected to Kampung Sawai, Matu, which is only about two kilometres away. I would also once again like to call on the Government, especially the Ministry of Utilities, to consider the applications that have been submitted to implement this rural electricity supply project in several settlements as follows, at least through the Sarawak Alternative Electrification Scheme (SARES) if it is not available or cannot be supplied through the grid line because there is no road to those settlements, as follows:

1. 10 longhouses at Passin and Batang Lassa in the Matu district, namely Rh. Akin, Rh. Atoh, Rh. Nanai, Rh. Janting, Rh. Henri, Rh. Imba, Rh. Kayak, Rh. Geruka, Rh. Johari and Rh. Selat; 2. 4 longhouses at Sg Serban, Daro, namely Rh. Minang, Rh. Chuchok, Rh. Menggong, Rh. Alak, and 7 longhouses at Nanga Lassa in the Sibu district, namely Rh. Muahammadin, Rh. Jimbau, Rh. Michael, Rh. Nira, Rh. Kamaraw, Rh. Catherine and Rh. Wih; and 3. One more house, namely Rh. Hudson Madut, at Sg. Sebinjai, also located in the Sibu district. Mr Speaker, apart from that, there are still houses in villages that have not been connected to electricity supply even though the village concerned already has electricity supply through the grid line. The reason given is that they cannot afford it because the charges imposed by SESCO for electricity connection cases are too expensive. Therefore, while waiting for the RES scheme, most of these houses have been sharing electricity connections from relatives' houses or neighbouring houses for many years. Accordingly, I propose that the State Government, through SESCO, help provide subsidies to bear the costs involved, especially the cost of installing poles, so that these people can enjoy a safe electricity supply.

Sarawak Alternative Water Supply (SAWAS)

Mr Speaker, I, on behalf of my constituency, representing seven longhouses at Ng. Semah, the residents of Kampung Penasu, and the residents of four longhouses at Sg. Serban, Daro, extend a thousand thanks to the State Government, especially the Sarawak Ministry of Utilities and the Rural Water Supply Department (JBALB), for implementing the alternative water supply project (SAWAS) in these three settlements. This project has improved the standard of living of the people here, who previously relied only on rainwater for daily use, which was often cut off during the dry season. Accordingly, I would also like to request that a similar project be implemented at seven longhouses at Ng. Passin, Matu, seven longhouses at Ng. Lassa, Sibu, and Rh Francis Kiyai, Ng. Singat, Sibu, Rh Hudson Madut Sebinjai, Sibu, and at Kampung Sabena, Meradong, for next year 2019. These settlements are a priority because they have large populations, as well as a rural health clinic and a primary school, and are located far in the interior.

Social Problems

Mr Speaker, what I have found is that the social problems that plague us today are not only focused on drug abuse or prohibited substances, but it appears that online gambling is increasingly rampant and widespread, including in rural areas. If this problem is not curbed, it will destroy society, especially the young. Therefore, I request that the relevant Government agencies take serious action to curb this problem so that it does not continue to spread.

To conclude my speech, I take this opportunity, Mr Speaker, to extend Season's Greetings for Christmas to all Honourable Members who are Christians, and a Happy New Year, hoping that the year 2019 will bring more development and prosperity to our beloved State of Sarawak.

Thus, Mr Speaker, I am very happy to fully support the Rang Undang-Undang Pembekalan (2019), 2018.

That is all, thank you.

Deputy SpeakerEN

The Honourable Member for Meradong.

Datuk Ding Kuong HiingSUPP · GPSMeradong

Thank you Tuan Speaker, for giving me this opportunity to participate in the debate on Budget 2019 which was tabled by Right Honourable Chief Minister on 5th November 2018.

First of all, I would like to congratulate the Right Honourable Chief Minister, who is also the Finance Minister for tabling the record breaking budget which not only is comprehensive and people centric but also a surplus budget that is all the most splendid especially during the recent economic uncertainty.

Of the double figure budget, 76% of it will go to the rural development with special emphasis on provision of basic amenities including water and electricity supply, roads and bridges and the renovation and rebuilding of dilapidated schools throughout Sarawak. Compare with the National Budget which was tabled last Friday whereby the allocation to Sarawak does not in any way reflect the contribution made by Sarawak to the Federal coffer. It just goes to prove that it is vital for our Fairland Sarawak be governed by local political parties as we cannot fan our hope on the leaders of Malaya based political parties to safeguard our economy and other rights and privileges for us. As they have all failed miserably in voicing out against their political masters in Malaya for the injustices shown towards Sarawak thus far.

Tuan Speaker, I would like to congratulate the Right Honourable Chief Minister for introducing a one-off incentive for all new born children starting next year. The incentive can only be withdrawn upon attaining the age of 18. However, I would like to urge the State Government to consider giving another RM1,000.00 each to the families concerned to ease their financial burden. At the same time, I would like to propose that bereavement grant of RM1,000.00 each to be given to every deceased family to assist them financially during the difficult time.

With the number of new born babies estimated at 40,000 and the number of deceased at 12,000 yearly, the above allowance to the people is definitely viable and affordable for the Government.

Tuan Speaker, please allow me to touch on some other issues that are dear to the heart of my constituents and all fellow Sarawakians.

RM1,100.00 minimum wage

The business sector in Meradong are concerned that the above policy is going to be applied across the board and this will have far reaching effect to small and medium scale businesses in small town like Bintangor and other similar town throughout Sarawak. I sincerely hope that we can find ways and means to ensure that there are not much burden by the new policy.

Free-hold Residential Landed Property

With the State financial position improving steadily, I would like to urge the State Government to consider changing the existing leasehold residential landed properties to freehold. This will benefit the urban and sub-urban people especially the medium and low-income group.

MA63 and Steering Committee

In recent years, the more our Sarawak people are equipped with the knowledge and understandings of the Malaysian Agreement 1963 or MA63, the more they demand the Federal Government to review the implementation of the MA63 in Malaysia after 55 years of independence and Sarawak Government should act as the mouthpiece for the people of Sarawak. As a State Legislative Member for Meradong, I also owe duty to my constituents in Meradong to speak on the recent development of the Federal Government which is to review on the implementation of MA63.

Pakatan Harapan made one of their pillars of promises in the election manifestos to return Sabah and Sarawak to the status accorded by the Malaysia Agreement 1963. Undeniably, this promise struck accord among Sarawak voters in GE14 held on 9th of May. The expectation of Sarawak’s people rose to the highest point when the Pakatan Harapan was given the mandate to become the Government of the day. Nevertheless, the Pakatan Harapan Government moved to fulfilling its promise to return Sabah and Sarawak equal status accorded by MA63 had not being on the right footing since. This is particularly so when the Steering Committee chaired by Yang Amat Berhormat Perdana Menteri formed to review the implementation of MA63 was a lopsided composition with only two representatives each from Sabah and Sarawak.

Tuan Speaker, I wish to extend my support to our right Honourable Chief Minister Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari Bin Tun Datuk Abang Haji Openg who was prompt to point out that the Steering Committee as proposed by the Pakatan Harapan Government is the wrong modal to review the implementation of MA63 as the start. The task of reviewing on the implementation of MA63 in Malaysia should be handled by an Inter-Governmental Committee or IGC a modal of our founding father adopt when forming the Federation of Malaysia. Therefore, I particularly happy to see that a Consultative Committee to complement the Steering Committee was formed with unanimous approval for Honourable Members from both sides of the divide. I hope this spirit of one voice and one heart in revisiting the MA63 can be continued until the ultimate aim of full autonomy for Sarawak is achieve.

Tuan Speaker, whether to the Sarawak Government together with all States Legislative Members of this august House, we are the representative of our people and we are being elected speak on their behalf in this house as long as to the Federal Government. It is no secret that the Sarawakian are getting restless and agitated due to frustration and disappointment of seeing how Sarawak position and rights are being eroded in the 55 years. As the steward for our people of Sarawak, Sarawak Government should not under estimate such sentiment and people’s movement like S4S and SAR 86 we saw lately. It might be incline to give more time for us to negotiate with the Federal Government about the implementation of MA63 but time may be running out soon.

Water Problem at Meradong District

Before I go any further into this matter, I would like to thank our Chief Minister for approving budget of RM81 million during his walkabout in Meradong earlier this year.

To upgrade the water reticulations system in an effort to solve the perennial water problem in Meradong District which has become a serious issue among the local communities. Therefore, it is vitally important that the Ministry concerned has to get the project on the way as soon as possible and at the same time do the necessary to ensure Meradong District get enough treated water supply either by some short term improvement works to Temuda Treatment Plant or get a fair share of the treated water supply from Bayong Treatment Plant, Sarikei via Bulat Junction.

At the moment, Bayong Treatment Plant apart from supplying to Sarikei and Tanjung Manis, it is also complementing the treated water supply to Bintangor town and Jalan KJD of N.46 Meradong and also to Sungai Sian, Tanjung Bundong and other areas in Semop and Matu Daro constituencies. Perhaps the proposed water supply system from Sibu to Tanjung Manis, once resolved will settle the water crisis for the whole of Meradong District.

Tuan Speaker, before I conclude, I would like to wish all Christian in this august House, Merry Christmas and to everybody in this august House a Happy New Year 2019. With this remarks, I would like to support the Budget 2019.

Thank you.

Deputy SpeakerEN

The Honourable Member for Repok.

Dato’ Sri Huang Tiong SiiSUPP · GPSRepokEN

Thank you, Mr Speaker, for giving me the opportunity to take part in debating the Appropriation Bill (2019), 2018 and the Motion to Refer the Development Expenditure Estimates for the Year 2019 Resolution, which was tabled in this august House by the Honourable Datuk Patinggi Ketua Menteri cum Minister of Finance and Economic Planning.

Mr Speaker, first of all I would like to congratulate the Honourable Datuk Patinggi Ketua Menteri for successfully tabling a very comprehensive and progressive budget that gives special focus to socio-economic development in rural areas while at the same time ensuring continued development in urban areas. This will ensure that Sarawak achieves the status of a developed state even amid the uncertain state of the world economy today.

The people of Sarawak are truly fortunate to have a government led by the Honourable Chief Minister, who is very caring towards the socio-economic development and progress of Sarawak. This excellent budget has been achieved through very efficient financial management without touching our 'reserve fund'. The efforts of the Sarawak government under the leadership of the Honourable Chief Minister in fighting for the rights of the people of Sarawak under the Malaysia Agreement 1963 (MA63) are something that is unanimously supported by the people of Sarawak.

Mr Speaker, the people in my area are very grateful that the Honourable Chief Minister has approved several major projects in our area. These projects, particularly the Sarikei to Tanjung Manis road project, the Agro Park project, the State Administrative Complex, and the Collection, Processing and Packaging Central (CPPC) Sarikei, have long been the aspiration and dream of the people in my area.

Therefore, I, as a son of Sarikei and also representing the people of Sarikei, extend my highest gratitude for the concern of the Honourable Chief Minister towards our area.

Mr Speaker, allow me to convey several issues that are close to the hearts of the people and important in my area. I hope they will receive the proper attention and consideration of the relevant ministries.

Poliklinik Sarikei

Sarikei is developing rapidly and its population is also increasing. As a result, Poliklinik Sarikei is already increasingly congested and no longer meets the needs of the local residents. Added to this is the location, which is now rather unsuitable. However, I would like to congratulate the management of the Polyclinic and the relevant Ministry for being so committed to taking steps to reduce the problems that have arisen. As one further step forward, I request that the Ministry consider building a new polyclinic or upgrading the existing polyclinic and also using the old hospital building nearby.

Flash Floods

The problem of flash floods is becoming more serious and is very critical in Repok. This is very dangerous and causes difficulties for the people. This situation is caused by rapid housing development and drainage systems that are outdated, too narrow and no longer efficient. In this regard, I hope that the Ministry can devise a strategic approach to overcome this problem.

Repok to CTC Junction Road

I would like to express my highest gratitude to the Government for the project to upgrade Jalan Repok from the Jalan Bersatu Junction to Jalan Tai Ping, a distance of 700 metres. This project is currently being carried out and the cost of the project is around RM2 million. Projects like this are indeed appropriate and very much needed for the comfort and safety of road users. However, most of this road and the drainage system over a length of 2.8 kilometres have still not been upgraded and are outdated, seriously damaged and dangerous. Therefore, I request the consideration of the Ministry so that the road, drainage system and street lights over that 2.8 kilometre length can be repaired and upgraded. The estimated cost of this project is RM9 million.

Nyelong By-Pass Road

This road, which is 4.9 kilometres long, is often used by local residents as well as heavy lorries as a connecting route to the industrial area, residential areas and the administrative centre of Sarikei. The number of users of this road is increasing, and I am confident that with the completion of the Pan Borneo Highway and the Sarikei-Tanjung Manis Road later, the number of vehicles passing through this road will increase many times over.

Therefore, I humbly request that the existing road be widened to four lanes and equipped with street lights. The estimated cost of upgrading this road is around RM8 million.

Technical Stream Schools or Vocational Colleges

Mr Speaker, Technical Stream Schools or Vocational Colleges are increasingly gaining a place in the hearts of our students, especially in the digital era today. Vocational skills can certainly enhance the competitiveness of our children. Therefore, the local community very much hopes that a TVET programme can be established in Repok so that our children can also play a role in Sarawak's digital economy.

For this reason, I request that consideration be given to establishing a technical stream school in Repok so as to provide wider scope for local children to pursue technical stream education.

Banks of the Rajang and Nyelong Rivers

Mr Speaker, the riverside promenade along Sarikei is very extensive. Furthermore, its strategic location on the banks of the Rajang River and the Nyelong River makes it very suitable as a place for recreation, leisure activities and an attraction for visitors, especially from outside Sarikei. Therefore, I request and propose that the existing riverbank be rehabilitated and upgraded and subsequently developed as a unique tourist destination in Sarikei. The estimated cost required is RM5 million.

Efforts to Help Planters and Farmers

Most planters and farmers in Sarikei cultivate their gardens on a small scale and still practise conventional farming methods. Agricultural output is also not at a satisfactory level. Therefore, in order to help agro-entrepreneurs increase their income, it is very important for the Government to assist them in terms of technical advisory services, strategic assistance and facilities such as farm or plantation roads.

For this, I request the relevant agencies to devise a comprehensive master plan and strategy to achieve the aspiration of the Sarawak Government to make Sarikei the Food Basket of Sarawak.

Subsidised Industrial Zone

Mr Speaker, it is time for us to develop other industries as added value to income in order to raise the standard of living of the people.

Therefore, I request that the Government consider establishing a Subsidised Industrial Zone in Sarikei, to help encourage downstream and manufacturing industries in Sarikei. This will open up employment opportunities for local children as well as raise the level of socio-economic development in Sarikei.

Mr Speaker, I would like to take this opportunity to express my highest gratitude to the Honourable Chief Minister for his concern for the interests of the people of Sarawak in the budget that has been tabled. A budget that is development focused and rural biased will certainly benefit the people of the whole of Sarawak in general and the people of rural areas in particular. I humbly request that more allocations be given to the Repok area.

Before concluding my speech, I would like to wish a Happy Maulidur Rasul to my friends who are Muslims, a Merry Christmas to my Christian friends and a Happy New Year 2019 to everyone. With pleasure, I fully support the Appropriation Bill (2019), 2018 and the Motion to Refer the Development Expenditure Estimates for the Year 2019 Resolution.

That is all, thank you.

Deputy Speaker: Are there any Honourable Members who wish to speak? Since there is no one going to speak, the House sitting is adjourned and we shall resume at 2.00 pm.

(The sitting was suspended at 11.45 am)

Mr Speaker

The Honourable Member for Bukit Assek.

Puan Irene Mary Chang Oi LingDAP · PHBukit Assek

Thank you Tuan Speaker for allowing me to debate on this Budget Bill. The issues that I would like to raise are these:

Permanent Residency (PR)

Tuan Speaker, getting a PR has been a long standing issue for foreigners who are married to Sarawakians. Without a PR, they would need to apply for social or spousal permit which needs to be renewed annually. And for professionals who follow their spouse back to Sarawak, they would find themselves jobless as they are not allowed to be gainfully employed.

As we know, our State Immigration Department has the autonomy concerning immigration issues. And for all PR applications to be approved, they would first need them to be endorsed by our State Authority.

Allow me, therefore, to bring to the attention of this august House many concerns regarding these issue as being practised by the State Immigration Department and the State Secretary Office.

(a) There is no time frame as to when the applications would be processed. It has been known for applicants to wait up for years before they would be contacted by Immigration to attend interviews (which incidentally, is the start of the process following the submission of applications);

(b) There is an inconsistent time frame for the processing of applications. Some cases were made in 2011 and have been approved and yet there are still some as far back as 2001 and yet nothing has been done for them after their relevant interviews;

(c) There is a lot of cases still pending at the State Secretary Department waiting for the State Secretary’s recommendation. Without the recommendation or endorsement, the applications cannot proceed and would be stucked there for years. Sometimes, the applicants would not know that the State Secretary has declined to give the recommendation and the matter would be KIV for years, thereby wasting on the times spent on the waiting before the applicants could take the relevant action to write a letter of Appeal to the State Secretary;

(d) No receipt is given to applicants upon submission of their application forms. Since there is no proof of submission, there is no reference number or date of application for follow-ups;

(e) For some successful applications, more often than not, applicants would not be informed immediately until they check with Immigration Department themselves. They would be told to wait for Letter of Approval which would be prepared and sent out by batches in accordance to their year of submission. From our enquiries, they are still preparing letters of approval for applications made in the year 2003. No reason would be given for the delay;

(f) Some officers are not well versed with the procedure themselves. Wrong and incomplete forms are very often given which would waste the applicants’ time and effort; (g) The PR application form does not provide the proper title “Borang Pemastautin Tetap” but instead “Permohonan Untuk Permit Masuk Ke Persekutuan”. Hence the confusion to some applicants;

(h) Officers do not provide applicants with proper advice and assistance is not readily available. A case in hand was a woman who has been applying for her Visit Pass for more than 30 years and she was never advised to go and apply for PR. The public is not made aware of their eligibility to make the applications; and

(i) Likewise, officers do not advise widows to apply for Pas Balu (Widows Pass). Instead, they would be told to go back to their country of origin as there is no one to sponsor their application of extension of Visa, even when the widow has been staying in Sarawak for more than 30 years with her extended family of Malaysian children and grandchildren. Imagine, Tuan Speaker to be told to start packing when your spouse has just passed away and to leave your whole family behind to return to another country which you have left for more than 30 years ago.

Tuan Speaker, the whole State Immigration Department needs a shaking up in their administration. The State Secretary Department needs more than a shaking up. It needs an overhaul in order to catch up with the numerous applications sitting on the desk of the State Secretary waiting for his attention. The Ministry of Integrity and Ombudsman and other relevant Ministries need to look into this non-performance or lack of performance.

Rabies

The Sarawak State Government has lost control of the battle against rabies. In July 2015, when Kedah, Perlis and Penang were invaded by the disease, the responses from the three States had one thing in common. The response was quick, decisive and with no expenses being spared for logistics and to mobilise the necessary manpower. The State Government of the three States never lost their focus in saving human lives above all. As a result, the disease which started in late July 2015 was stemmed out by 3rd November 2015, a mere three months later, with not a human life lost.

In Sarawak, we have a different sadder story. Since July 2017 when the first human case was reported, 12 human lives have since been lost. And these lives could have been saved if our State Government had acted swiftly, decisively and without fear of any backlash, political or otherwise, upon the first hint of trouble – like Kedah, Perlis and Penang where rapid mass vaccinations were immediately carried out. Roadblocks at State borders were also set up by the State Veterinary Services Departments. Drastic measures like culling of stray dogs were fearlessly given the green light. Sufficient manpower was put in place with no expenses being spared.

Tuan Speaker, I understand that Sarawak has a much larger and different geographical landmass. But the State Government should not fall back on that as the reason for their loss of control against the spread of disease. Everything start small before it becomes humongous. Likewise, the diseases have started with two deaths in Serian before spreading to almost every division, save for Mukah and Limbang. And if we do not step up in our effort, it would only be a matter of time before these two divisions are also affected. Rightly, the fight against the disease had started out as localised. But because, right from the very beginning, the State Disaster Management Committee was anxious to play down

the severity of the matter, this had led to a complacent attitude by the people and hence the lack of cooperation and hence the unchecked early spread of rabies.

Indeed, the Honorable Member for Nangka had gone to the Press to lament on the lukewarm response to the vaccination exercise in Sibu on 20th January 2018 and had attributed that to the lack of publicity and public ignorance on the deadly rabies disease. The point is, Tuan Speaker, most people have the mentality that they are untouchable until they are struck down, much like a prisoner on the death row not realising the finality of the sentence until he is staring at the gallows. Therefore, I am compelled to say that the laidback approach by the State Government is causing more harm than good in the handling of this deadly disease.

This, on top of insufficient manpower and human resources had led to the inability to carry out mass vaccination of at least 70% of the dogs’ population, as is the recommended guideline. I understand in Sibu alone, until now, mass vaccination has only reached about 30% because there is only one team from the State Veterinary Department to cover the whole of Sibu, Selangau and Kanowit. No matter how tirelessly this Team may have worked, it is humanly impossible to expect them to cover the landmass that they are to cover.

Similarly, the dog catchers are at their wits end. In Sibu, there are only two Teams and it is unrealistic to expect them to work 24/7. And that is why I am baffled as to why Budget presented by the Honourable Chief Minister did not even touch on any funds allocated to fight this disease at our doorstep. The Budget focuses on physical development, especially in the rural areas. That is not wrong but physical development should not override human development. What is the good of all these physical developments if one by one of our people are struck down by this disease which has already gone out of hand? Is the State Government therefore, serious in eradicating and removing rabies form our midst?

Tuan Speaker, I say enough is enough. Let us get our priorities right and take control. With only Mukah and Limbang left, more urgent and aggressive actions are required. More teams need to be formed and tasked for humane capture and quarantine of stray dogs. And where those dogs are found to be infected while under quarantine, they should be put to sleep humanely and where found to be healthy, to be given vaccination to be released thereafter. A lot more need to be done to ensure that the population immunity of the animals is sufficient to prevent circulation of the rabies virus. And all these need financial allocations for the relevant authorities to ensure that they would be implanted and enforced efficiently.

And the story should not end here, once the disease is under control. A stray management machinery should be put in place for the Local Authorities and State Veterinary Department to carry out strict enforcement measures to ensure that strays are kept out of the street. This should be made a way of life event without the rabies around.

Standard Operating Procedure for Adoption

On 28th August 2018, these words were spoken to me over the phone, “As long as I have not received the Standard Operating Procedure (SOP), I am not going to do anything!”

Tuan Speaker, these words were spoken by the District Officer of Sarikei after he refused to extend the standard adoption application form to the guardian of the 16 years old girl even though the girl was borned in Sarawak but of which he had erroneously and summarily considered as having no Sarawak connection under Section 5(1)(a) of the Sarawak Adoption Ordinance. The District Officer (DO), after being pressed by me, admitted that he did not attend the Adoption Workshop organised by the Ministry of Welfare, Family and Community Well-being on 8th June 2017. And that was when he insisted in receiving the SOP first before he would reconsider and in spite of his own absence on the Workshop,

he could not be bothered to even consider if the 16 years old girl has the Sarawak connection for the adoption to be legally processed.

Tuan Speaker, I wish to ask the Ministry of Welfare, Family and Community Well-being as to when would the SOP for Sarawakian Adoption be in operation? It has been more than a year since the Workshop. Have all relevant Departments been extended a copy and have all the Departmental Heads being briefed so that the incidences like the Sarikei DO would not be repeated? This 16 years old child would have turned 17 on 22nd February 2018. And once she reaches 18, the chances of her being adopted by the family who raised her would be gone unless the Sarawak Adoption Ordinance would be amended following the brainstorming Workshop carried out by the same Ministry on 8th of August 2018.

Tuan Speaker, I ask that the Ministry to expedite the issues and concerns raised here as the stakeholders are anxiously waiting to proceed with their adoption applications and thereafter with their citizenship application and so forth.

Urban Poor

Tuan Speaker, I say that the fall of the Federal Barisan National (BN) Government is indeed a good thing. For without so, this State Government would never have seen the urgent need to beat the Federal Government in the race to serve the people. The people can only benefit when the State Government roll out the much needed allocations for the development of the State, provided that every allocation is handled with transparency and accountability so as to ensure that every cent is delivered to its intended recipients, namely the rakyat. Perhaps this august House may be enlightened on the State Development Coordination Committee as mentioned in the State Budget and the Members sitting in this Committee and if any Opposition Members has been chosen or shall be chosen to sit in the Committee for the check and balance. The House needs to know that this Committee set up would carry out the executive duties efficiently and in an impartial and transparent manner. So while the Government is in the ambitious mood, may I remind this House not to neglect the urban poor, especially their need for funds to address and resolve some of the following perennial problems plaguing them.

Clogged and Broken Drains in Sibu

For every five drains in Sibu, four and a half of them would be blocked and clogged up with rubbish and filth. There are drains which are clogged up because of a desperately needed desiltation work. And there are drains where parts of it have fallen through, thereby causing water to get blocked and cannot flow through. And no matter how many times the Local Councils have received the complaints of blocked and clogged drains, their response would be the standard reply that their Council has only got sufficient funds to cursorily dig the drains but not to do a true siltation work. In turn, during rainy season, the clogged drains would often cause flash floods and filth from the drains would flow into the houses and even coffee shops.

Of course, Tuan Speaker, we would say that the drains would not have got clogged up if not for the rubbish thrown in. Be that as it may, may I suggest that all drains, particularly in areas prone to flash flood, be covered up. This would prevent environmental contamination and would prevent the drains being used as dumping grounds. Indeed, the whole drainage system in Sibu, particularly in Bukit Assek, needs a revamp. A study should be done on what is the most suitable type of drain for those areas and which would resolved at least 90 percent of the constant problem of clogging and flooding, bearing in mind the soil condition and so forth. We should learn from more advanced countries like Australia and China where one hardly sees open drains in any parts of their country.

Back to Sarawak, Tuan Speaker, a case in hand, where an open drain which serves the neighbourhood at Lorong 3, Jalan Kapor in Sibu, has its middle part fallen through, resulting in the blockage of water from one section to the other. The rain water collected at the inner section of the drain has become stagnant and flowed inward into the residents’ houses after a heavy rain. Sibu Municipal Council (SMC) has done two superficial diggings and advice that was the best they could do as they have not got sufficient funds to carry out the necessary job of reconstructing and repairing the whole drain which serves the residents at the lane. And these residents continue to live in dread of rainy days as in many other parts of Sibu and the rest of Sarawak too.

So, Tuan Speaker, while the State pushes for rural development, there is still a lot of urban areas which needs the urgent attention from the Government of the day, including the sinking roads in so many parts of Sibu.

Glue Sniffing

We all know the very real danger of glue sniffing, how it can lead to addiction to other real drugs. Glue sniffing is a gateway drug and the frightening things is that it is rampantly getting out of control among our young children.

The recent episode at Jalan Seng Ling Landfill in Sibu where families of squatters were found to be residing there, were reports of children as young as seven and eight years old being seen sniffing glue. In fact, the Society for Education of Under Privileged Children in Sabah reported that children as young as three to four years old are sniffing glue.

This needs to be stopped, Tuan Speaker, because it has been shown that long-term effects of glue sniffing include memory loss, addiction and brain degeneration. Children addicted to glue sniffing also displays violent behaviour and are prone to bullying. Besides all these, these children would most probably would grow up to become drug addicts and would contributed to the escalating crime rate in our society. According to recent statistics on drug abuse in Malaysia, it is estimated that the number of addicts will reach RM3 million by 2020.

So therefore, Tuan Speaker, in Sarawak, let us do something about this. Do not let our children be ensnared by this gateway drug. As in Singapore and Thailand, enact by-laws to prohibit the misuse of certain substances, including glue which may caused intoxication when inhaled. Amend the Local Authorities Ordinance or the Public Health Ordinance to make it an offence to misuse these substances including inhaling them. Where children are involved, their parents should be held accountable. Take authority into our hands to do what we can for our own people, Tuan Speaker.

On another note, I wish to thank the Ministry of Welfare, Community Wellbeing, Women, Family and Childhood Development for taking swift action after receiving the information from Honourable Member for Pelawan and myself, concerning the squatters found to be staying at Jalan Seng Ling dumping site in Sibu. We shall be obliged for an update on the actions taken to assist these people. I conlude.

Thank you.

Mr Speaker

The Honourable Member for Batu Kitang.

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

Thank you Tuan Speaker. Thank you for the honour and the opportunity to debate Yang Amat Berhormat, the Chief Minister’s address at this Second Meeting of the Second Session of the 18th Sarawak State Legislative Assembly. I support and congratulate Yang Amat Berhormat, the Chief Minister for his articulate budget speech and his success in getting a double digit positive budget for the first time in the history of

Sarawak where 75% of the budget will go into development. This is in contrast to Semenanjung Malaysia’s deficit budget. This positive budget does not eat into our reserved but from the skillful ways of the YAB Chief Minister by imposing 5% sales tax on our oil and gas. And this is better than the 20% promised by Pakatan Harapan which until now, we have yet to see any cent of it.

Honourable Member for Kota Sentosa, Member of Parliament for Stampin do not seems to agree with this 5% of the sales tax imposed by the Sarawak Government. Honourable Member for Kota Sentosa must have got his mathematics wrong, how can it not benefit the people of Sarawak when this 5% sales tax amounting to almost RM4 billion a year is shared among three million people in Sarawak and not 30 million people in Malaya. All it does is PETRONAS will make RM4 billion less from the RM15 billion given to Malaya annually.

I am happy that we have RM4 billion income, extra income of State budget to develop our State’s infrastructure. Sarawak is on its way gaining financial independence under the capable leadership of our Chief Minister.

Tuan Speaker, Petroleum Development Act 1974, a device that although passed by Parliament, however did not follow a substantive provision of the Federal Constitution and was therefore unconstitutional, null and void and of no legal effect. Sarawak under our Chief Minister is fervently pursuing our wealth from oil and gas to be returned to Sarawak and I’m happy to note that everyone in this august House to support his move.

The recent RM271 billion Federal budget where Sarawak and Sabah have only be allocated a miserable RM4 billion and RM5 billion respectively only goes to show how unimportant Sarawak is in the eyes of the Federal Government. Where are the beautiful promises for an equal status for Sarawak and Sabah with Malaya? Where are the voices of objection and discontentment of our Pakatan Harapan members of parliament? How can you allow our new Prime Minister to get away with this disgraceful act of bully and disregard for Sarawak and Sabah? This is an insult to the intelligence of Sarawakian and Sabahan. I wish to congratulate our Honourable Chief Minister ... (Interruption...)

Mr Speaker

You give way?

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

Yup.

Tuan Speaker, thank you to Honourable Member for Batu Kitang. Okay for 2018, the budget presented by your so beloved Najib to Sarawak was RM4.336 billion. For Tun Mahathir, he gave RM4.346 billion, RM10 million more. How can you people did not mention about all this last year? How can you did not bark about this last year? Now, you complaint this year. First Tuan Speaker, we agree Pakatan Harapan Government as Federal Government, but as GPS come in to say, Pakatan Harapan Government Federal Government is bad so they are now barking so because last time they could not get it from Najib now they want to get it from Mahathir. Say that Pakatan Harapan is better, then we go and tell them. We are now, put it this way Tuan Speaker, Sarawak is an opposition State in Malaysia.

Mr Speaker

The Honourable Member for Pelawan.

Ya. I’m trying to rebarking because he said the RM4 billion. Last year it was RM4 billion. This year RM4 billion next year RM4 billion. But last two years they did not say anything. Now they are talking about it this year.

Mr Speaker

You can say your piece afterwards.

Encik David Wong Kee WoanDAP · PHPelawanEN

Ya okay... (inaudible…)

Mr Speaker

Okay, proceed.

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

Thank you Honourable Member for Pelawan. I did not say the previous Government gave us too much. But what I am saying is you guys promised equal status for Sarawak and Sabah. You are the one who make the promise. You are the one who make the promise that we have equal rights. You are the one who make the promise that you give back all our oil and gas, our rights and what have you done today? Yes, 55 years I agree but you made a promise. Where is your promise? Where? Big talk empty can. You make a lot of noise. Give back what you promised. Equal rights, equal status, integrity and all the bullshit.

Mr Speaker

Order, order.

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

Okay let me continue. Let me continue okay. I have said my piece, let me continue. I wish to congratulate our Honourable Chief Minister ... (interruption...) you are a lawyer, leave it to the courtlah, the MACC has already investigated, let them do their job. Don’t worry, don’t worry. We will put the right, the wrong right, don’t worry. I wish to congratulate our Honourable Chief Minister for his brainchild in successfully mooting the motion to have a Consultative Committee yesterday, comprising of members from all political parties represented by this august House to advance and safeguard the special interests, rights and position of Sarawak as enshrined in MA63 and the Federal Constitution and to meet the expectations of Sarawakians for greater autonomy and devolution of powers to Sarawak.

Tuan Speaker, Honourable Member for Kota Sentosa MP for Stampin talked about accountability, integrity, transparency this morning. I wish to remind our MP not to forget the elephant in the room. PETRONAS, the biggest cash cow in the country is immune from having to report to Parliament. Following Pakatan Harapan’s promises to be fair and transparent, I hope that PETRONAS will not be immune but answerable to Parliament. I wish to remind Honourable Member for Kota Sentosa MP for Stampin, I’m sorry he is not here today, that Khazanah and PNB also holds hundreds of billions of dollars and do not have to report to Parliament as well. Where is the accountability, integrity and transparency that was promised before the GE14? And after our new Prime Minister took over, where is this... (interuption...)

Tuan Speaker, thank you, Tuan Speaker I think he is a gentleman, I have to give it to him, but we have to understand that since....

Mr Speaker

Honourable Member for Pelawan, since Honourable Member for Batu Kitang is gentlemanly so you must act gentlemanly.

I am very gentleman, I asking him for clarification, he talks about PETRONAS, Khazanah all these. But bearing in mind that Pakatan Harapan took over only after 509 but for the past 55 years, it was under Barisan Nasional even if Pakatan Harapan want to change, the system has to be change. Its not that easy certain amendments to the Constitution must be done. Will GPS and UMNO support that. We don’t know. That’s why I am seeking for clarification. Want to quote about Khazanah, I think if you feel that something is wrong, lodge a Police Report. GPS you have members in Parliament, raise up in Parliament and there is substantial proof that there is something wrong, lodge a Police Report and MACC we will support you. Okey, thank you.

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

Thank you, Honourable Member for Pelawan. Back to that same question same analogy you guys won the election because you made a promised to the

people of Malaysia to be fair, to be transparent, now I’m just asking that you stick to what you had promised to us the people to ensure transparency, credibility, accountability, fair and just. This is what you promised before the election, so you ask me right, give us a time, now Prime Minister is now the Chairman of PETRONAS. He should not be the Chairman according to what you have say and why are you guys so keeping quiet? You check the internet he is, sorry sorry owh, not PETRONAS, I apologise, I take that back, he is not the Chairman of PETRONAS he is the Chairman of Khazanah. That is equally bad, okey. Where is your accountability, integrity and transparency?

Tuan Speaker, our Prime Minister for six months, Tun Dr Mahathir, visited China and saw for himself how China has grown into an economic giant in a span of just over 40 years after their “Open Door Policy”. He asked Malaysians to return to help rebuild Malaysia, a country which Tun Dr Mahathir said is at the brink of an economic disaster.

Instead of spelling out how to improve this policy of attracting overseas Malaysians back, he returned home only to pass more discriminatory remarks on why it is important to continue giving special rights. If our PM is genuine in wanting overseas Malaysians to return to help Malaysia, he should not have insisted on continuing with the New Economic Policy (NEP) which Pakatan Harapan has also mentioned in your GE14, your manifesto, that you will abolish this. He should practice a fair and just policy for all races and help all Malaysian citizens based on needs. You mentioned this in your Pakatan Harapan Manifesto, why is it not done?

Pakatan Harapan had banked on the policy to win the election by stating fairness and justice for all but after they won, many including Pakatan Harapan members from this august House kept quiet even when the Prime Minister’s policies were against their beliefs.

The New Economic Policy (NEP) has been in place for decades and it has failed. We can see for ourselves how many poor Bumiputeras there are in Sarawak. How is our Prime Minister going to achieve a developed status by 2020? The NEP was the cause of unfair discriminations instead of helping all the poor from all races. We are together in this. If any help is to be rendered, it should cut across the board regardless of who we are. I am saddened to hear that the Prime Minister had reaffirmed this policy yet again in a recent BBC interview.

With unchanged policies, talented overseas Malaysians will not opt to return. Such unfavourable policies have caused and is causing many to migrate. So, I can safely say, that even though this is a brand new Government, we still have the same old policies.

When a Government reaches out to help its people, it should do so to help those in need. We need the new Government to provide good hospitals, good medical facilities, good schools, affordable education and housing within the reach of every citizen. Job opportunities should be given to capable and qualified people. Competition shapes character. It will enable all to strive and work harder only then will wealth in the nation multiply. The private sectors are prime movers of our economy. The Government of the day facilitates and regulates. Is this so difficult for the new Government to comprehend and to implement?

Unified Examination Certificate (UEC)

Tuan speaker, what a joke it was when the Federal Minister of Education chose to draw on the colour of shoes instead of concentrating on working towards recognizing UEC. Let us not forget that some of the Chinese schools in the rural areas especially Sarawak have over 90% Bumiputera students. Teachers were there to give their best and were never

worried about who are attending their schools. They only strive to bring out the best in each pupil.

Our late Chief Minister, Tok Nan took one single day to announce and recognize UEC in Sarawak. How much longer is the Pakatan Harapan Government going to take to recognize UEC? Talk, talk, talk, cakap-cakap sini, cakap-cakap sana, until today tidak nampak (Interruption...) You Promise. Najib didn’t promise. You promise. Accepting UEC... (Interruption...) Yes! I bark because you promise. Why did you make that promise?

Tuan Speaker, accepting UEC is a positive step towards making Malaysia a more inclusive and a more competitive country. Let me remind our Pakatan Harapan members in this august House that education is meant for all to pursue knowledge for the betterment of Malaysians and it should not become a platform for anyone to play politics with. The Education Minister should know that UEC is recognized in top universities abroad, just like Tok Nan. He recognized it, but not in our local public universities. How silly and impractical is our Federal education policy? And what is Pakatan Harapan doing about this? (Interruption...)

UEC students opt to go overseas because they were rejected by their own country. Then after completing their higher education, they look for jobs in their adopted countries and stayed on. The vicious cycle continues. Year after year, we lose our brightest student to other countries.

Mr Speaker

Ahli Yang Berhormat, you have two minutes more.

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

This is the main cause of brain drain.

Tuan Speaker, we are thankful that our Chief Minister, Datuk Patinggi Abang Jo has reiterated that policies which benefited the State will continue. Sarawak is fortunate to have Datuk Patinggi (Dr) Abang Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg who is a wise leader; a leader with good economics accruement and who looks at positive changes in policies.

Project Rejected

Sarawak Pakatan Harapan can claim whatever they want but the truth is that many projects have been cancelled since they took over the Government. My Batu Kitang constituency, Haji Baki community centre and upgrading of the hawker centre, cost only RM2 million have failed to proceed.

Flood mitigation projects in Sarawak amounting to ten of millions have also been cancelled. Our Honourable Member of Parliament for Santubong had mentioned that RM250 millions worth of flood mitigation projects have been cancelled, and this is the most important, the most project that is required by the people in Sarawak. Flood mitigation.

I am extremely disappointed that every day, the Federal Government takes RM250 million worth of Sarawak’s oil and gas and still have the cheek to rob Sarawak off basic infrastructure projects comprising of roads and drains which are pertinent.

Now, the Federal Government is talking about National Car no.3. It upsets me to think that billions could be spent on a whim at the expense of sacrificing funds for education and development projects.

I wish to reiterate once again. Do not just talk, Honourable Member for Stampin. Give us back our full autonomy on Education and Health. Let Sarawak decide on our own

education and health policies. Stop your play action of the 20% oil royalty. Just give back whatever you have agreed, 20% of whatever. The money gives us back. (Interruption...)

We know, we will, wait! I haven’t finish. Just give back. Okay. Sarawak do not acknowledge PDA74 and the Territorial Sea Act and Sarawak acknowledges full ownership of our oil and gas (interruption…) Sorry. I have given you two chances already.

I wish to point out too that Tadika Kemas in Kampung Paya Mebi in my Batu Kitang constituency is below flood level and I hope that our Honourable MP will look into this as well as it is education.

Besides that, erosion has happened and a lot of road had collapse in my Puncak Borneo area, my Padawan Council Puncak Borneo area.

I wish that the new Government will stop Sarawak siphoning RM15 billion net profits in oil and RM49 billion gross profits in gas from us annually, so that we can construct better road infrastructure for our people in Sarawak.

At the council level, the Federal Government pay us RM27,500 through Marris Funds for the maintenance of every kilometre of councils road. The fact is that the actual amount costs around RM300,000 to seal one kilometre of 50 milimetres thick. (Interruption...) You come and see me in Padawan, I will show you. (Laughter...) It is no wonder that all roads in Sarawak.

Mr Speaker

You have to conclude Ahli Yang Berhormat.

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

It is no wonder that all roads in Sarawak do not have sufficient fund for the council to carry out effective and quality maintenance. Where are your words? Equal status, give us back. We want 100% of our oil and gas.

Thank you Tuan Speaker.

Mr SpeakerEN

Honourable Member for Ba’Kelalan.

Encik Baru BianPSBBa'kelalan

Thank you Tuan Speaker for giving me the opportunity to address this august House on the occassion of debating the Sarawak Budget 2019 tabled by the Honourable Chief Minister. Sarawak Budget

On the whole, I am happy that this budget is a development-based budget focusing on rural areas. Indeed, this budget has been hailed as a historical and highest ever budget by many of my Honourable colleagues on the other side of the Dewan. Compared to the 2018 budget of RM5.78 billion, this year’s budget of RM11.914 billion is definitely a blockbuster.

The focus on projects that will benefit the people, especially in the rural areas is welcomed, as it has been a long time coming.

To quote the Chief Minister I quote, “our State of Sarawak, despite of 55 years of independence, is still lagging very very far behind in its development as compared to that of Peninsular Malaysia. It is saddening indeed to see that the people of Sarawak have not been able to enjoy good quality of life with the necessary infrastructures and amenities, particularly our rural community.”

Further on, when touching on the issues of school, the Chief Minister said that I quoted him, “it is disheartening to see our children have long been suffering from such poor quality condition and are forced to study in such inferior learning environment.”

Listening to the Chief Minister, I was reminded of the title of my book, “The Long Awakening”. It is heartening to know that after 55 years, the leaders in the State Government have finally realized and acknowledged the real situation of Sarawak and Sarawakians. It is not too late to admit that we are left far behind.

However, the irony of this situation is that the GPS politicians conveniently overlook the fact that this is the legacy created by their own former best friends – UMNO/BN, of which GPS had been part for 55 years. Our schools did not become dilapidated overnight, nor did the roads linking the town with rural villages in the State suddenly become inadequate since Pakatan Harapan won the elections, but they had been neglected over the past 55 years. If only the GPS leaders had woken up earlier and had been wise and bold enough to speak up to their UMNO/BN masters, Sarawak would perhaps not be in such a dire straits. In the Chief Minister’s budget speech and in the comments by other GPS leaders after the Federal budget was tabled, any common theme… (interruption)

Mr Speaker

Are you taking clarification from The Honourable Member for Batu Kitang?

Ir Lo Khere ChiangSUPP · GPSBatu Kitang

Yes, Speaker. Thank you The Honourable Member for Ba’Kelalan, thank you Minister, Honourable Minister for Works. You mentioned 55 years, you mentioned Barisan Nasional and UMNO. But, do you realized that it is the same person, Tun Dr Mahathir who was there, who created all these in the first place?

Thank you.

Encik Baru BianPSBBa'kelalan

Thank you very much Yang Berhormat. We know those facts, we are not ignorant of that. We will admit that. In the Chief Minister’s budget speech and in the comments by other GPS leaders after the Federal budget was tabled, any common theme was the lamentation that Sarawak has not been given enough allocations by the PH Federal Government.

These commentators do not want to concede that the new Government is only six months old and have had to grapple with crippling debts incurred by the man hailed by the same GPS leaders only a year ago as I quote “best ever Prime Minister for Sarawak”. The legacy of mismanagement, theft and debt inherited from the BN Government, of which the GPS members were a part, is truly mind-blowing in its astronomical amount. GPS members had chose to stay quiet in the face of mounting criticism and revelations about the appalling greed and arrogance of the previous Prime Minister and the members of his Government, especially in the 1MDB scandal.

Any complaints that GPS have now about the sorry State of Sarawak and the perceived lack of allocation are in fact reflections of their own complicity in this country’s past and history. The Finance Minister said in his budget speech that the real figure of our national debt is RM1.065 trillion, which is RM350 billion more than what the previous Government admitted to. Besides that, the previous Government had secretly paid RM7 billion of 1MDB’s debt up to 30th April this year, leaving an estimated RM43.9 billion more to be settled by the new Government. Also, the Government has to repay income tax refunds of RM37 billion that were never repaid by the previous Government. As a partner that accepted this shocking grand-theft by the BN Government, the now renamed GPS should not be so ready to shoot their new found bullets at the new Government that is cleaning up the humiliating mess that has featured in major news networks around the world.

On the 5% Sales Tax on all petroleum products, I welcome the move as long as it is done in a proper manner, but it is a case of better late than never. The State Government could have initiated this a long time ago but did not choose to do so for reasons best known to them.

Notwithstanding the foregoing, I am glad to see that the State Government is now willing to spend money on rural development including the rebuilding, repairing and upgrading of dilapidated schools, and providing water and electricity supplies and road networks.

In fact, this is how the federation should work. The Federal and State Governments should compliment each other in providing allocations for development and spending, for the benefit of the people in the nation.

I am also happy to note that the GPS Government is not averse to learning from the PH Governments in Penang and Selangor in adopting the birth incentive of RM1000 for each child born.

We must also acknowledge that the Federal Government is giving an allocation of RM4.346 billion to Sarawak, which is an increase of RM10 million from last year’s allocation. To say that this amount is the only sum that Sarawak will get is mischievous and misleading. The Federal Government has made allocations to the various Ministries, and the spending by these Ministries will cover Sarawak as well. Besides being responsible for the provision of items such as education, health services and infrastructure, the Federal Government also pays for our police and defence forces, i.e. for the safety and security of the whole country.

Any discussion of budgetary issues should be done in the context of federalism. The bottom line is that the Federal Government will always be responsible where the Federal Constitution requires. One instance of this is in the mandatory allocation of funds for the maintenance of State roads in Sarawak, i.e. the State Road Grant under Part II of the Ninth Schedule of the Federal Constitution. The Federal Government makes provisions for this in the MARRIS allocations every year.

The fact of the matter is that, Tuan Speaker, the Federal Government is in a weak financial situation to meet all the development needs of the State because of their predecessor’s mismanagement, but it has managed to come up with a budget that has generally been well-received by economists and analysts.

The Federal allocation for Sarawak together with Sarawak’s biggest budget should be sufficient to fund the development of our economy in 2019 and improve the lives of Sarawakians, especially in the rural areas. The application of the funds and the implementation of projects must be done transparently and efficiently, and not given to cronies of those in power. Every cent must be spent wisely on Sarawak.

Malaysia Baru

Tuan Speaker, I now wish to speak a bit on the Mid-Term Economic Review of the 11th Malaysia Plan, as it will show that the Federal Government is not neglecting Sarawak as claimed by some.

The new Federal Government has been in the seat of government for less than a year and the policy of this new Government can be summed up in two words – good governance. We resolve to fulfil the Pakatan Harapan manifesto as best we can, given the state of the Government’s finances.

As mentioned by the Chief Minister at the conclusion of his speech, the Prime Minister had just tabled the Mid-Term Review of the 11th Malaysia Plan in which he said that priority would be given to Sarawak and Sabah for the remainder of the Plan.

The Prime Minister announced that priority will be given to accelerating development in Sabah and Sarawak for the remainder of the 11th Malaysia Plan. The Federal Government acknowledges that Sabah and Sarawak have had limited access to basic infrastructure and this has resulted in stunted business activities and economic growth.

Under Pillar Three of the Review, measures will be undertaken to address development imbalances in six regions, including Sabah and Sarawak. These measures include strengthening and streamlining state and regional development planning to stimulate economic development in promoting balanced growth. Rural infrastructure will be enhanced to spear social economic activities in bridging urban rural gap. The development in Sabah and Sarawak will focus on strengthening inclusive and equitable development to benefit the rakyat.

Under the same pillar are five strategies to accelerate development in Sabah and Sarawak. The main components of the strategies are: intensifying economic growth and development planning; improving infrastructure for better connectivity; expanding access to basic infrastructure, amenities and services; increasing employment opportunities and enhancing the development of customary land.

Our areas of concern are mainly infrastructure, schools and healthcare. The Prime Minister announced that the Government will upgrade 400 schools and three hospitals namely Miri, Lawas and Papar.

Rural regions such as the Baram areas, Kapit division, Kanowit district and Limbang division will be given improved infrastructure including roads, water and broadband connectivity.

Efforts will be intensified to expand road networks including the construction of rural roads and roads to hydro dams and the upgrading of former logging roads.

Also, efforts will be taken to increase the capacity and efficiency of airports and ports to enhance inter and intra connectivity and increase competitiveness of the states.

Tuan Speaker, facilities such as internet access and electricity supply to schools, especially in the rural areas will also be improved.

In the provision of telecommunication infrastructure, the Federal Government plans to increase broadband coverage in rural areas with the construction of 106 new telecommunication towers and upgrading 400 existing towers.

To boost housing infrastructure, the Federal Government aims to provide 7000 affordable houses in Sabah and Sarawak.

In providing the various forms of infrastructure, the Federal Government of Malaysia Baru will strive to ensure that all projects are awarded in a fair and transparent manner and that contractors will be held to the highest standards of performance.

Having said all these, Tuan Speaker, allocations may not be satisfactory for now, but we must realise that the Federal Government has to spend within its means and within the financial limitations we have inherited. We are aware that the previous Barisan Nasional Government may have approved a lot of projects but that doesn’t necessarily mean we have

the budgets for them. Being a responsible new Government, we must be prudent and ensure that we do not allow our country to sink deeper into debt.

Pan Borneo Highway

The first phase of the Pan Borneo Highway is under way and the second phase is being planned. The Prime Minister had announced that there will be a rerouting of the second phase to bypass Brunei i.e. the Miri-Lawas-Sindumin road.

The diversion of the highway will open up the interior of Sarawak for agricultural activities and business opportunities for the people living in the vicinity. There are several longhouses around the area, and the residents will benefit from the connectivity that this diversion will provide.

Tourism will also get a boost, as travelling to the various attractions in the area will become easier. Places such as Mulu, Mt Murud, Batu Lawi and Batu Buda in Limbang have huge potential for tourism, especially the latter three destinations which have not been promoted as tourist destinations.

It will be a lifeline for Limbang as at the moment there is a highway from Miri to Temburong bypassing Limbang. This proposed diversion would connect Limbang, bringing a much-needed boost to the economic activities there.

In addition, a spur road linking Long Pa Sia in Sabah from Long Semadoh side would open a corridor in the Lawas highland with Sabah that would boost flows of tourists intra state, definitely benefitting our locals.

On a more practical note, the bypassing of Brunei will make it easier for patients from the rural regions of Baram, Bario and Ba’Kelalan to get medical treatment in Miri Hospital or hospital in Kota Kinabalu.

Ketua Kampung

This issue has been widely discussed in social media and highlighted in the press, Tuan Speaker. It has been an issue for many years. Before the Ordinance was passed, Ketua Masyarakat had always been elected by the people. There was no duration limit – they were credible respected people who had the confidence and trust of the people. The moment these positions were politicised, they become political tools. Although the Ordinance made it clear that they were not to be politically involved, this rule was never enforced. The State was given the power to enforce the law but instead they made it worse. The Ketua Masyarakat became political tools used by the ruling political parties to control the rural folk.

We had suggested that the Ketua Masyarakat be elected by the people, and then appointed by the Government and I hope the State Government would consider this proposal, which was the method traditionally practised in the past. What about the Penghulus, Pemancas and Temenggong? I suggest that the Penghulus be elected by the Ketua Kampungs, and the Pemancas by the Penghulus and the Temenggong by the Pemancas.

Mr Speaker

Are you taking clarification from Member for Muara Tuang?

Encik Baru BianPSBBa'kelalan

Yes, please. I give him way.

Tuan Speaker, Yang Berhormat Ba’Kelalan. On that point when you raised about the election of Ketua Masyarakat, I would like to know how

would you conduct the election? Is there any guiding law, principles, rules or anything that can make such an election tenable without any untoward sort of repercussion? Because if you do allow election in that sense as we do election as, you know, for Yang Berhormat Parliamentarians, then you can find that these so-called candidates for Ketua Masyarakat would be subjected to a lot of political manoeuvring and there will be a lot of politicking, you are dividing all the longhouses, the kampungs and so on or even further. So, would you not agree with me, ya, this is a point of clarification but then another proposal, that before you, anyway decide on any particularly election sort of mode for these groups of people, would you consider making a proper study, ya, a holistic study on this?

Thank you.

Encik Baru BianPSBBa'kelalan

Thank you Yang Berhormat. I am aware, Tuan Speaker, that there is already election in the longhouse. They hold their own election. It is very simple election, the whole people at the longhouse gathered together. There would be election who would be recommended to be the Ketua Kampung of the longhouse… (Interruption…)

Ya, okay. That is what I understand there is already an election. A simple election that all the people gathered together and that is okay we elect our Ketua Kampung, KK or Tuai Rumah. And they would normally have one or two or three proposals, the top three elected, then these names would be submitted to the District Office. The problem there, Tuan Speaker, for I know personally of this, there would be one that is totally qualified, the top one that got the top numbers but then the second one maybe the one that will be appointed by the Government without any good reason and just because they are friendly to that person whatever. That is what I am saying, there is already a system, a simple system that you just gathered everybody and that is my proposal. So, that is okay. Yes.

There were elections in the longhouses and so on. How then would they be appointed? Who appoint them? The longhouses or would it be the TYT, under the Ordinance that we have?

Encik Baru BianPSBBa'kelalan

As far as I know there is an Ordinance. According to the Ordinance supposed to be appointed by the governing council but I think it is done through the Minister of Social Affairs. That is how I understand but it could be to the Resident of the District Office.

No, another thing Minister. As you understand that Tuai Rumah, Ketua Kaum and so on so on, they were paid, the KKs we called it, they were paid by the Federal Government from certain times until the last Government. And then, they were all appointed under the Ketua Masyarakat Ordinance of Sarawak but then, I think the Federal commitment to pay them was out of goodwill as well as a sign of good cooperation of the State. That is why we continue. Just like the NCR surveys, there were commitment based on Federal policies to assist the State.

Mr Speaker

What is your question?

These were the things, so now that, what were the basis of you holding back that policy to pay? Was is that you are abandoning this policy?

Encik Baru BianPSBBa'kelalan

No, no it is not. Okay, it is very good. I am glad he asked this because I think he doesn’t know that in fact there was a stop for a while because of the election. That was from May onwards, ya, and for the whole of this year. And for next year 2019, RM35 million have been approved for Ketua Masyarakat in Sarawak.

Mr Speaker

Member for Muara Tuang, let him proceed.

Encik Baru BianPSBBa'kelalan

Yes, we are continuing, it is only the question of appointment of the Ketua Kampung and Ketua Masyarakat. So this is the suggestion I have, Tuan Speaker. It is up to the State to adopt these. But as far as the allocation is concerned, let me make it very clear that RM35 million have been approved for next year. For this year, that was done because of the disruption of the election. Thank you, Tuan Speaker. Do I still have time?

Mr Speaker

Your time is up but I give you extra time.

Encik Baru BianPSBBa'kelalan

I have just only one more; Human Capital.

Mr Speaker

Proceed.

Human Capital

In the Mid-Term Review of the 11th Malaysia Plan, the statistics on labour force skills show that in Sarawak, the proportion of low-skilled workers has been increasing since 2011, while the proportion of semi-skilled workers has decreased. With a slight increase in the proportion of skilled workers. Taken with the other states, Sarawak is the third lowest in terms of the proportion of skilled workers to the total work force after Sabah and Kelantan, and third highest in terms of the proportion of low-skilled workers after Sabah and Penang.

Investment in human capital is paramount for any country that strives to improve their standard of living. The provision of education and training is pivotal to economic growth and development, and we must continue to provide the necessary training so that our labour force will be able to take up the opportunities in our job markets and hence reduce our reliance on foreign labour. I hope that the State will be able to provide such training, possibly with the collaboration of some Federal agencies.

Conclusion

Tuan Speaker, 55 years after the formation of Malaysia, we are sailing on unchartered waters. Pakatan Harapan has formed the new Federal Government and the former BN parties, now renamed GPS, find themselves as an opposition State in the nation. If our common goal is good governance for the benefit and betterment of our citizens, then we should set our minds and efforts on the huge task at hand. I hope the State Government will be able to deliver on the ambitious plans set out in the Budget 2019 so that the living standard of Sarawakians may finally be able to start approaching that of our cousins in Peninsular Malaysia.

As a new Cabinet Minister in the new Pakatan Harapan Government, let me give you the assurance that we are ready to work together with the State Government to implement any projects that are beneficial for our people in Sarawak. Don’t be too fast in making conclusions or rather presumptuous in alleging that my colleagues and I in the new Federal Government have not acted in the best interest of Sarawak when it comes to matters affecting Sarawak. Time will proof whether we fare better than our predecessors.

In conclusion, may I take this opportunity to wish all Christians a blessed Christmas, and to all, a Happy New Year.

May God Bless Sarawak, and I pray that “justice roll on like a river, righteousness like a never failing stream” from this august House to the whole State of Bumi Kenyalang. Thank you, Tuan Speaker.

Mr Speaker

Honourable Member for Samalaju.

Encik Majang anak RenggiePRS · GPSSamalajuEN

Thank you, Mr Speaker, for giving me the opportunity to take part in the debate on the Budget Motion for 2019 last Monday.

Before continuing my speech, I would like to take this opportunity to join in extending congratulations to the Honourable Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg on being conferred an Honorary Doctor of Philosophy in Economic Development by Universiti Malaysia Sarawak (UNIMAS) on 29 October 2018.

Mr Speaker, I also wish to convey my appreciation and thanks to the Honourable Chief Minister for successfully preparing the 2019 Budget, which is the largest annual budget ever tabled in this august House, with a total allocation of RM11.914 billion. This Budget is further strengthened by a prudent fiscal policy accompanied by high accountability and integrity.

Among the very interesting highlights in the 2019 Budget is the increase in development allocation to RM9.073 billion, or 76% of the total, compared with RM7.40 billion, or 70%, in the current year, while maintaining a surplus budget.

In focusing on development in rural areas, RM6.049 billion, or 67% of the development allocation, has been distributed to strengthen and sustain development momentum in rural areas. Mr Speaker, rural communities always thirst for continuous development, and the attention given in this 2019 Budget is seen as capable of meeting the needs of the people.

As expected, state revenue is also set to increase by RM6.72 billion, a new outline that shows the sustainability and resilience of the state's economic structure. This truly demonstrates the Honourable Chief Minister's full commitment and determination in driving sustainable development in the State of Sarawak towards achieving developed state status by 2030.

Indeed, as a representative of people who represent an area consisting of both urban and rural classified areas, I very much hope that the 2019 Budget can narrow the development gap between urban and rural areas.

Mr Speaker, in this budget presentation I greatly commend the approach taken by the Honourable Chief Minister in introducing an incentive of RM1,000 for every child of Sarawak citizens born from 1 January 2019, which can only be withdrawn after the child reaches the age of 18. This is one of the drivers of a saving culture among parents in preparing for their children to receive the best and most complete education.

Issues in the Samalaju State Legislative Assembly Area

Mr Speaker, in this limited yet valuable space, allow me to draw the attention of the Honourable Members of this august House to raise issues in my area, the State Legislative Assembly (DUN) N.70 Samalaju.

Strengthening Human Capital Development

Mr Speaker, in line with the Government's aspiration to make the Samalaju Industrial Park (SIP) the most advanced and modern industrial hub in the region through the Sarawak Corridor of Renewable Energy (SCORE) development, special attention must be given to providing workforce education in the form of skills and technical training. This skilled and semi-skilled workforce must keep pace with the growth and workforce needs of the industrial sector located here.

Therefore, I urge the Government to give priority to providing infrastructure and equipment related to skills and technical fields at every educational institution in this state. It is hoped that with the implementation of this priority, the number of skilled graduates of quality and competitiveness can be increased.

Need for People's Housing Programme

Mr Speaker, in general, the construction and provision of housing must keep pace with population growth and the growth of the industrial sector. These housing projects must be people-friendly and can be used to resettle squatter residents, while also meeting the needs of low- and middle-income groups.

Unfortunately, although the Samalaju Industrial Park (SIP) has already accommodated and will further accommodate several companies from within and outside the country, no people's housing has been implemented in this area. What exists are only a few apartment blocks built by the private sector, where the limited units cannot cope with the overwhelming demand and high needs. This situation is very troublesome and causes workers to feel burdened and stressed because they have to commute daily from Bintulu to the Samalaju Industrial Park (SIP), a distance of 110 kilometres. Distance and time will certainly become constraints and cause many problems for the workers.

Therefore, I urge the Ministry concerned to ensure that affordable housing projects, people-friendly housing, low-cost and medium-cost housing can be implemented at the Samalaju Industrial Park (SIP) or surrounding areas to meet housing needs in line with the rapid population growth resulting from the rapid industrial development in this area.

Strengthening the Agriculture Sector

Mr Speaker, looking at the agriculture sector and agro-based industries, particularly for communities who depend on agricultural produce in the Samalaju DUN, the implementation and adoption of modern agricultural technology among target groups must be intensified. Through the adoption of this agricultural technology, communities can also undergo transformation in strengthening human capital capacity to produce farmers with broad knowledge oriented towards technical, business and marketing skills.

Therefore, I propose that the Government establish a Food Production Park (Food Production Park) in the Samalaju area to meet residents' demand for increasing food production and marketing.

Clean Water Supply

Mr Speaker, the problem of the absence of treated water supply is often a lament of the people. Most places in my area have already received treated water. However, some parts of the area are still facing a persistent dilemma, continuing to beg for kindness because there is no clean water.

In this regard, it occurred to me this afternoon to ask the Sarawak Ministry of Utilities when the construction of Phase II and Phase III of the treated water distribution system in the Suai area will begin.

Delayed Electricity Supply Applications

Mr Speaker, I would also like to ask the Sarawak Ministry of Utilities what is the status of the delayed electricity supply applications for residents in the Samalaju DUN that we have forwarded to the Ministry?

Road Facilities

Mr Speaker, there are several villages and longhouses in the Samalaju DUN still pleading for the Government's sympathy to provide proper road facilities. For example, residents in the Suai area who very much thirst for good roads, given that the main road in this area has remained gravel since 30 years ago. Even more troublesome, several parts along this road are often cut off by floods when there is heavy rain.

Therefore, I move that the upgrading work on the Ulu Suai road be expedited in line with the Rural Transformation Implementation that is the focus of our Budget allocation distribution this time.

NCR Land Survey

Mr Speaker, I look forward to the implementation of the Land Code (Amendment) Bill 2018 at the last State Assembly sitting, so that their land can be surveyed and given the status of ownership rights. Therefore, I propose that the 2019 budget allocation be distributed to carry out the survey work for native customary rights (NCR) land, and in this regard, I hope that NCR land whose perimeter and individual lot surveys have been completed should be issued Title Deeds promptly.

Still on the same matter, I would like to ask the Ministry concerned, what is the status of NCR land for the Sebiew-Similajau area, Bintulu-Miri Road, which was surveyed in 1972 and 1973?

Proposal to Establish a New District

Mr Speaker, the proposal to establish a new district covering the Samalaju Industrial Park (SIP) was voiced by me in this august House during the previous sitting. This time I feel called upon again to bring up this proposal, given that the need to establish a new district is very appropriate so that any development planning can be implemented more effectively and efficiently.

Recreation Centre

Mr Speaker, the development of a town does not only take into account the need for places of leisure and sport but emphasises the natural beauty that needs to be gazetted. In Bintulu, Tanjung Batu Beach is very popular among local and outside residents. The beach is adjacent to Taman Tumbina, which houses various types of flora and fauna, a golf course, and the Bintulu Development Authority (BDA) office building standing firmly on the hill facing the sea.

In addition, its rocky coastline with the mesmerising crashing of waves, followed by the breeze of the sea wind, will certainly be a remedy for longing hearts, and is worth preserving and conserving as a tourism product. This area should not be developed as a commercial area that will be surrounded by shophouses later. Meanwhile, all forms of development such as sea reclamation in this area are strictly prohibited.

Therefore, I recommend that the Government ensure Tanjung Batu Beach is not only maintained but also has its infrastructure and facilities improved so that it can be enjoyed by all visitors and at the same time become a source of pride for the people of Bintulu.

And as a closing, Mr Speaker, finally I greatly commend the openness of the Honourable Chief Minister in his efforts to continue the development momentum of the State of Sarawak so that it continues to grow rapidly. May the Honourable Chief Minister always be given strength, health and well-being in all his affairs.

I extend Season's Greetings for Christmas to my friends who are Christians, and a Happy New Year 2019 to all the people of Sarawak.

With that, I fully support the Supply Bill (2019), 2018 and the Motion to refer the Development Estimates Resolution for 2019.

Puyu fish, selasih leaf, Thank you, thank you.

Mr Speaker

Any Honourable Member wishes to speak? Ahli Yang Berhormat, the sitting is now adjourned and the House shall resume its sitting tomorrow at 9.00 a.m.

(Mesyuarat ditangguhkan pada jam 3.47 petang)