Sarawak · 8 November 2018

18th Assembly, 3rd session, 2nd meeting (unedited) · not final · 144 turns · 51,958 words · official PDF ↗

56 of 144 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSarawak publishes only unedited transcripts (Belum Disunting). The 19th Assembly was dissolved on 26 Oct 2026. Speakers are matched by our parser and will have some errors.

(Opening)

Mr SpeakerEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, the mercy of God and His blessings, and greetings of peace. Honourable Members, I have granted leave of absence under Standing Order 81 to Yang Berhormat Encik Baru Bian Honorable Member for N.81 Ba'Kelalan for today's sitting until 14th November 2018 and Yang Berhormat Encik Gerald Rentap Jabu, Honourable Member for N.36 Layar for today's and tomorrow's sitting.

Questions for Oral AnswersQuestions

Mr SpeakerEN

Honourable Tuan Haji Razaili Bin Haji Gapor, Beting Maro.

Tuan Haji Razaili Bin Haji GaporPBB · GPSBeting MaroEN

Thank you, Mr Speaker. Peace be upon you, the mercy of God and His blessings, and greetings of peace.

Pineapple, a berangan fruit, Ripe and red is the pomegranate fruit, I humbly ask the Datuk Minister to give an answer, My question is 145.

Proposal for the Construction of Bridges along the Sebuyau Beladin/Pusa and Sesang Stretch (145) YB Tuan Haji Razaili Bin Haji Gapor asked the Minister for Infrastructure Development and Transportation. What is the current status of the proposal to build the Batang Lupar Bridge, Batang Saribas Bridge and Sg Krian Bridge, which complement the Coastal Highway along the Sebuyau Beladin/Pusa and Sesang stretch?

Status of Work on Long Lama Bridge across Baram River

(164) YB Encik Dennis Ngau to ask the Minister for Infrastructure Development and Transportation. What is the percentage of achievement against the schedule to work on Long Lama Bridge across Baram River situated at Long Lama town to date? When is the Marudi Bridge to start its construction?

Datuk Haji Julaihi Bin Haji NarawiPBB · GPSJunior Minister of Jalan Pesisir · SebuyauEN

Thank you, Mr Speaker.

Thank you, Honourable Member, for asking. The question is answered as requested.

Mr Speaker, to answer the question from the Honourable Member for Beting Maro, allow me to answer it together with question 164 from the Honourable Member for Telang Usan, N.77, because both questions touch on bridges that are rural connectivity. May I? So, for the information of the Honourable Member for Beting Maro, the construction of the Batang Lupar Bridge was originally approved by the previous Federal Government together with the Sarawak Government on a 50%-50% sharing of the construction cost. However, the Sarawak Government received a letter from the Pakatan Harapan-led Federal Government through the Ministry of Public Works Malaysia (Kementerian Kerja Raya Malaysia, KKR) stating that this project was postponed, as stated in the letter sent to our Ministry dated 24 August 2018.

However, we have not given up, because recently we have been demanding the fulfilment of the promise to meet the needs of rural people. Thus, a meeting was held with the Minister of Public Works Malaysia, who is also the Honourable Member for Ba'Kelalan, together with officers from our Ministry and the Public Works Department (JKR), regarding our hopes in Sarawak to claim the promise to build this bridge for the needs of rural people, where it was stated that this bridge is very much needed and it was also stated that the Federal Government at least agreed to approve an allocation of RM400 million as 50% of the construction cost of the bridge. This was stated positively by the Honourable Minister of Public Works Malaysia, who is also the Honourable Member for Ba'Kelalan. I only hope that the Honourable Member for Ba'Kelalan, who is also a PKR member, can convince the Pakatan Harapan (PH) Federal Government about this need, because the Batang Lupar Bridge is among the most strategic bridges on the coastal road route in Sarawak, and we hope he can speak on behalf of the people of Sarawak, especially the rural people of Sarawak at this time.

However, Mr Speaker, at the same time the Gabungan Parti Sarawak (GPS) Government led by the Honourable Chief Minister is very concerned about and prioritises the needs of rural people in coastal areas, and therefore the Honourable Chief Minister has announced that the Sarawak Government agreed to finance the construction cost of this bridge. However, based on discussions with the Honourable Minister of KKR, who is also the Member for Ba'Kelalan, we hope that when the allocation from the Federal Government is approved in the Twelfth Malaysia Plan (RMK-12), any cost financed by the Sarawak Government at a rate of 50% will be returned or reimbursed in RMK-12. This is what we hope the Honourable Minister of KKR can do.

Mr Speaker, we still hope the Federal Government truly respects and is convinced, convinced of the need I mentioned earlier, because this bridge is indeed very important and the Sarawak Government truly holds firmly to the prayers and hopes of rural people today. We are certain we want to fulfil the hopes and prayers of rural people.

Meanwhile, Mr Speaker, to answer the question about the Batang Saribas Bridge and Sg. Krian Bridge, which was also asked by the Honourable Member for Beting Maro, these have been approved and fully financed by the Sarawak Government through the Coastal Road Connectivity Programme (Program Perhubungan Jalan Pesisir) (Coastal Connectivity Program). So both the Batang Saribas and Batang Krian bridges are among several projects fully financed by the Sarawak Government. Indeed, the people of Sarawak are close to the heart of the GPS Government led by the Honourable Chief Minister, and this project will be tendered at the end of 2018, I mean both the Batang Saribas and Batang Krian bridges, and construction is expected to commence in the first quarter of 2019.

To answer the bridge question raised by the Honourable Member for Telang Usan, I am pleased to inform as follows. For the information of the Honourable Member for Telang Usan, during my visit to Long Lama Bridge on 25 October 2018 recently, the construction of the project is progressing smoothly with the current achievement of 87.6% against the schedule of 90.2%. This project is fully funded by the Sarawak Government, and this is also one of the bridges fully financed by the Sarawak Government. The Marudi Bridge has been approved under the Honourable Chief Minister's Walkabout Project. The project was tendered on 3 November recently, that is 3 November 2018, and construction is scheduled to commence in the first quarter of 2019. So here, Mr Speaker, we can witness that the concern of the GPS Sarawak Government led by the Honourable Chief Minister towards the need for connectivity in rural areas, whether in coastal areas or in the interior of Sarawak, and I can state once again that this is why the public as a whole should understand that only the Government led by the people of Sarawak truly understands the needs of the people of Sarawak today.

However, at the same time Mr Speaker, I am very disappointed that certain parties are trying to frustrate the implementation of bridge construction, especially on the coastal road of Sarawak. Why should rural people, whether in coastal areas or interior areas, also have the right to better infrastructure and facilities in the future? Certain parties are trying to use various channels, including legal channels, solely to frustrate this project, and I hope these parties do not follow mere political desires, and because they follow mere political desires, the needs of the people may be disrupted and affected. Indeed, I can say that the actions of these certain parties I consider cruel to the needs of rural people, whether people in coastal areas or people in interior areas.

Please don't be too prejudiced to the needs of our people in the rural area. Be it in the coastal of Sarawak or in the interior part of Sarawak. Please, taruh sikit perasaan terhadap keperluan kamek orang luar bandar. Jangan ikut nafsu politik untuk menggagalkan projek kamek di luar bandar di Sarawak ini.

Thank you, Mr Speaker.

Tuan Haji Razaili Bin Haji GaporPBB · GPSBeting MaroEN

(Supplementary Question) Patience, patience.

Clove flower and pandan leaf, Become the flavouring of fruit juice, Thank you for the answer, There are two supplementary questions.

Thank you, Mr Speaker. Thanks are extended to the Honourable Chief Minister and the GPS Government for finally implementing and completing the network connectivity and the coastal people.

(a) What is the scope of work for the three bridges I mentioned?

(b) What is the cost of building all three of these bridges?

Datuk Haji Julaihi Bin Haji NarawiPBB · GPSJunior Minister of Jalan Pesisir · SebuyauEN

Thank you to the Honourable Member for Beting Maro, who is so concerned about the connectivity needs in coastal areas of Sarawak. This is among the struggles of GPS representatives in Sarawak who are aware of the needs of our people in rural areas.

To answer the first question, let me first touch on the Batang Lupar Bridge. The Batang Lupar Bridge is a bridge 5.1 kilometres long, a 5.1 kilometre cable stayed bridge comprising 710 metres of cable stay and 4.39 prestressed balance cantilever. This means that if we add both together, the length is 5.1 kilometres. At the same time, we need to build access road (jalan tuju), approach road on the Sebuyau side and also on the Triso side, involving the construction of access road of 5.7 kilometres. For the Batang Saribas Bridge, it is a two lanes single carriage way, 1.55 kilometres long and 12 metres wide. Access roads also need to be built on both banks of the river leading to the Batang Saribas Bridge, involving access roads of 3.35 kilometres. For the Sungai Kerian Bridge, it is a two lanes single carriage way 690 metres long and 12 kilometres wide. Access roads also need to be built on both banks of the river leading to the bridge, of 1.3 kilometres.

To answer the second supplementary question on cost, this is an estimate and the actual will depend on the actual tender later on. So the estimated cost for the Batang Lupar Bridge is RM1 billion, because we expect it to involve a cable stayed bridge. For Batang Saribas, the estimate is expected to be RM495 million. And for the Kerian Bridge, we expect the cost to be RM174 million. So these costs are estimates. So we hope to get a better cost when it is tendered later.

Thank you.

Encik Dennis NgauPBB · GPSTelang Usan

(Supplementary Question) Thank you, Tuan Speaker. Thank you Menteri Muda. Can I have one supplementary question? Sorry. How much is the cost of Long Lama and Marudi Bridge and what is also the scope of work for both bridges?

Thank you.

Datuk Haji Julaihi Bin Haji NarawiPBB · GPSJunior Minister of Jalan Pesisir · SebuyauEN

Thank you to the Honourable Member for Telang Usan. We have together inspected the construction site of the Long Lama Bridge recently, and for the information of everybody, just to share with everybody, the construction cost of the Long Lama Bridge is RM67.1 million.

Meanwhile, the construction cost for the Marudi Bridge is estimated at around RM90 million. And the scope of work for the Long Lama Bridge involves the construction of two lanes approximately 573 metres, two lanes bridge cantilever, meaning less than 1 kilometre, the length is only 573 metres, and at the same time, like any bridge, we need to build access road or approach road. So for the Long Lama Bridge, it involves the construction of approach road leading to the bridge from both banks of the river, 621 metres long. Meanwhile, for the Marudi Bridge, it is 650 metres long, which also involves the construction of approach road of 1.1 kilometres. So both these projects are also part of the projects approved by the Sarawak Government, meaning fully financed by the Sarawak Government, and this once again proves to us that the GPS Sarawak Government truly understands the needs of the people, whether in interior areas, coastal areas or urban areas. This is the GPS Sarawak Government, the people's government of the State of Sarawak.

Thank you.

Mr SpeakerEN

Honourable Dato' Haji Idris Bin Haji Buang, Muara Tuang.

Dato’ Haji Idris Bin Haji BuangPBB · GPSMuara TuangEN

Thank you, Mr Speaker. There is a pantun.

Songket headscarf, the inspiration of scholars, Making the princess infatuated, Although the Federal budget brings sorrow, Our Chief Minister steps forward to defend.

My question is number 2, today's number 2, number 146. Thank you.

Overcoming Water Problems Throughout Sarawak

(146) YB Dato' Haji Idris Bin Haji Buang asked the Minister of Utilities. The State Government has allocated RM2 billion to overcome water problems throughout Sarawak.

To what extent have the related works been carried out, and what are the next actions?

Datuk Liwan LagangPRS · GPSDeputy Minister of Water Supply · BelagaEN

Thank you, Mr Speaker. For the information of the Honourable Member for Muara Tuang, the allocation announced and disbursed by the Honourable Chief Minister is not RM2 billion but more than that, namely RM2.8 billion. Well, for the information of the Honourable Member for Muara Tuang, the projects announced by the Honourable Chief Minister are located throughout Sarawak, especially in rural areas that are facing critical water shortages.

So far, four projects have been completed, 16 are under construction, and the rest are at the design and tender stage. The implementation process for these projects is through open conventional tender (design by consultant and in-house), open pre-qualification tender design and build and open tender design and build.

Dato’ Haji Idris Bin Haji BuangPBB · GPSMuara TuangEN

(Supplementary Question) Thank you, Deputy Minister. I have two supplementary questions.

(a) What are the projects that have been completed and what is their cost?

(b) What are the causes or factors that have caused the problems in the stress areas, including the Muara Tuang Samarahan area?

Thank you.

Datuk Liwan LagangPRS · GPSDeputy Minister of Water Supply · BelagaEN

Thank you, Honourable Member for Muara Tuang. For the first question, the projects that have been completed are the temporary drainage system in Pusa, the improvement of the filtration system at the treatment plants in Nanga Ngungun and Kanowit, the replacement of leaking FRP tanks at the Nanga Tadak water treatment plant, and repair works on the high-level tank at the Nanga Sekuau water treatment plant. The total cost of these projects is RM720 thousand.

Meanwhile, for the answer to the second question, for the information of the Honourable Member for Muara Tuang, the water supply problems in stress areas including Muara Tuang are due to insufficient raw water sources, insufficient treatment capacity, inadequate water treatment processes, dilapidated and leaking piping systems, a low rate of revenue-generating water (kadar air tidak berhasil), and high non-revenue water.

Mr SpeakerEN

Honourable Encik Martin Ben, Kedup.

Encik Martin BenPBB · GPSKedupEN

Thank you, Mr Speaker.

ICQ Tebedu Bandar Mutiara di Daerah Tebedu

(147) YB Encik Martin Ben asked the Chief Minister. What is the Government's strategic plan to redevelop or improve the ICQ Tebedu area and attract investors to the light industrial area of Bandar Mutiara, in Tebedu District?

Datuk Haji Mohd Naroden Bin Haji MajaisPBB · BNJunior Minister of Small and Medium Enterprise Development and Entrepreneurship · GedongEN

Thank you, Mr Speaker, and the Honourable Member for Kedup. For the information of the Honourable Member for Kedup, on 28 December 2017 the Federal Government and the Sarawak State Government announced an agreement. An agreement to jointly develop the Customs, Immigration, Quarantine and Security (CIQS) Complex in Tebedu. Accordingly, the Sarawak Government has approved a master plan. An integrated development master plan for the CIQS Complex

in Tebedu. This master plan will cover the new CIQS complex and will also be connected to the existing Tebedu industrial park. The Ministry also plans for part of the existing industrial area to be gazetted as a free industrial zone. This aims to stimulate economic development in the area concerned.

For the information of the Honourable Member, at this time we are still awaiting further decisions from the newly formed Federal Government regarding the proposal for the implementation of the project. Since May 2014, the enforcement of the Trade Agreement, 1970 (BTA) by the Indonesian Government has limited the value of goods exported through the Tebedu Inland Port, and this has resulted in a serious decline in cross-border trade activities and also gave a negative sentiment to businesses, especially in the Tebedu industrial area.

Accordingly, the State and Federal Governments at that time raised this issue with the Government of the Republic of Indonesia to reach a solution and hoped that trade could be normalised immediately. We believe that cross-border trade has great potential for the benefit of both parties, namely West Kalimantan Indonesia and Malaysia, especially Sarawak. Moreover, the Sarawak State Government has also proposed to the Government of the Republic of Indonesia, through the Indonesian Minister of Trade, that the Tebedu-Entikong area be made a special development area where we can plan for a joint border development covering manufacturing and industrial sectors, real estate development, tourism as well as agro-based industry.

However, the Sarawak Government continues with all efforts to promote Sarawak as an investment destination through programmes such as overseas investment missions, entrepreneurship seminars, dialogue sessions with the business community, and expos held from time to time, including investment in the Tebedu area.

Thank you.

Encik Martin BenPBB · GPSKedupEN

(Supplementary Question) Thank you for the answer just now, Honourable Deputy Minister. I have two supplementary questions. How has the implementation of the cross-border trade policy by the Indonesian side affected cross-border trade activities at Tebedu-Entikong? The second supplementary question: what actions have been taken by the Government to normalise that cross-border trade?

Thank you.

Datuk Haji Mohd Naroden Haji MajaisPBB · BNJunior Minister of Small and Medium Enterprise Development and Entrepreneurship, Junior Minister of E-Commerce · GedongEN

Thank you, Mr Speaker, and the Honourable Member for Tebedu.

Apart from the socio-economic impact on the towns, the medical field and employment in plantations and so on, the most obvious impact is the decline in the value of trade across the Tebedu-Entikong border.

For example, in 2013 the record highest trade value was about RM766 million, and this value declined from time to time until 2017. This value is only RM93 million. This clearly shows that efforts to normalise the situation in Tebedu are very much needed.

Several actions have been taken by both countries, especially through the state of Sarawak, through the Prime Minister of the time, through the MITI ministers

Malaysia and Indonesia, and through Government officers and then through NGOs, through seminars and so on.

Some actions that the Government has proposed are such as setting up the ITC Joint Trade and Investment Committee between the two sides, working group meetings on a cross-border trade agreement, the Annual Consultative Malaysia-Indonesia, the Commission for Bilateral Cooperation Between the Two Countries Committee, and the forum of the Malaysia-Indonesia Socio-Economic Working Committee, or SOSEK MALINDO.

Thank you very much, and we hope that this new Government led by the new Prime Minister and the new MITI Minister can help us normalise the border at Entikong-Tebedu so that the trade that existed before will shine and increase in the future.

Thank you.

Mr SpeakerEN

The Honourable Member Encik Chukpai Ugon, Murum.

Encik Chukpai UgonPRS · GPSMurumEN

Thank you, Mr Speaker.

The night is pitch dark, Light the candles to walk to the garden, Courtesy and good manners are our culture, Becoming a pride through the ages,

My question is number 148, and I ask the Honourable Minister to please give an answer.

E-Commerce Programme for Rural Entrepreneurs and the DUN Murum

(148) YB Encik Chukpai Ugon asked the Minister of International Trade and E-Commerce. What are the Government's plans to implement the e-Commerce Programme for entrepreneurs in rural areas and the DUN Murum? Does the Government intend to build entrepreneur hubs in rural areas and the DUN Murum?

Datuk Haji Mohd. Naroden Haji MajaisPBB · BNJunior Minister of Small and Medium Enterprise Development and Entrepreneurship, Junior Minister of E-Commerce · GedongEN

Thank you, Mr Speaker, and the Honourable Member for Murum.

For the information of the Honourable Member for Murum, although the concept of e-commerce has been practised in other countries for about 18 to 20 years, such as in European countries, the USA, China and so on, in Malaysia, including here in Sarawak, it is a new concept. So far, all the programmes we have implemented are awareness programmes, mind-opening or exposure, with the hope that our people, especially our entrepreneurs, will understand and appreciate e-commerce as a platform for our business in the future.

Since the establishment of the Ministry of International Trade and e-Commerce Sarawak (MITEC), we have carried out 11 roadshow programmes across the whole state, starting from the Kuching Division to Limbang, in the towns, small towns, including the areas of Ketibas, Kapit, Merudi, Beluru, Sekuau and several other areas in rural regions.

These eleven (11) programmes are just to mention a few: online business workshops, the eUsahawan digital achievers programme, train-the-trainers for managers and assistant managers of companies, digital economy and e-Commerce seminars for entrepreneurs and village heads, Kampung Reachout, which is an e-Commerce awareness programme for rural communities, ePhoto presentation and online marketing, an apps challenge in collaboration with Unimas, start-up quest, digital free trade zone, the FTZ together with MDEC, introduction to digital business model together with PIKOM, Persatuan Industri, Komputer dan Multimedia Malaysia, and transforming digital business for Sarawak youth and SMEs. At the same time, several programmes related to e-Commerce have also been implemented by several Government agencies, including Federal agencies, such as Agro bazaar online, e-Dagang desa, eTrade, eRezeki, cellik IT penuh kocek dan masuk. For the information of the Honourable Member for Murum, MTEC will implement an e-Commerce awareness programme in Sungai Asap at the end of this year, and MCMC has built 124 internet centres, most of which are in rural areas, to facilitate the people in communicating, searching for and exchanging information, and perhaps in future carrying out their online business activities.

Thank you.

Another question, question B, is about Entrepreneur Hubs, which are business premises for the convenience of doing business, including those built by several other agencies, whether in the city, in towns, or in villages in rural areas. The Sarawak Ministry of Industrial Development and Entrepreneurs (MIED) has built several entrepreneur hubs, such as in Lawas, Betong, Sri Aman, Damai, Semariang, Gedung and Limbang. As for the Murum area, although the ministry has no plans yet to develop an entrepreneur hub in the Murum division, I would like to call on the Honourable Member to submit an application together with a proposed site for the establishment of an entrepreneur hub for the Honourable Member's Murum area.

Thank you.

Encik Chukpai UgonPRS · GPSMurumEN

Thank you, Honourable Deputy Minister, for the answer just now. I have two (2) supplementary questions:

(a) What ICT infrastructure development has been and will be implemented by the Government in the Murum area?

(b) What benefits can the residents of Murum enjoy through the development of infrastructure, communications and ICT?

Datuk Haji Mohd. Naroden Haji MajaisPBB · BNJunior Minister of Small and Medium Enterprise Development and Entrepreneurship, Junior Minister of E-Commerce · GedongEN

Thank you, Honourable Member. I have been informed that so far MCMC and SACOFA have built four communication tower units, which are now fully operational within the YB Murum area. The state Government, through the Sarawak Multimedia Authority (SMA), has also planned to add six more communication tower units within the Murum area. At the same time, the Government has also installed one small cell attached to a pole. The Murum e-resettlement at Long Tengulang must be in the Honourable Member's area, I feel. I believe so. And what benefits can be enjoyed by residents in rural areas, including the Murum area, through ICT communications infrastructure. So, what we understand is that the internet and technology have changed the way the world works. It will always keep changing the way we work as long as technology continues to advance and the people of the world continue to embrace technology. So, for us in Sarawak, in Malaysia, including the Murum area, the internet and technology will give us the same level playing field, a level playing field, I mean that no matter where we are, whether we are in Kuching or in the interior, including the Murum area, and no matter how big our investment is, whether millions of ringgit or only RM1,000.00, the internet and technology

will give us the same level playing field, the same opportunities, especially in promoting products, payment transactions and so on.

Thank you.

Mr SpeakerEN

YB Datuk Ding Kuong Hiing, the Honourable Member for Meradong.

Datuk Ding Kuong HiingSUPP · GPSMeradong

Terima kasih, Tuan Speaker.

New Light Industrial Estate in Meradong

(149) YB Datuk Ding Kuong Hiing bertanya kepada Menteri Pembangunan Perindustrian dan Usahawan. Is there any plan for the Ministry to introduce new light industrial estates in Meradong as the existing industrial area is near to the housing estates, schools, sports complex and Government department and deemed unsuitable for its original planned purpose?

Encik Malcom Mussen LamohPRS · GPSJunior Minister of Industry and Investment · Batang Ai

Thank you, Tuan Speaker and thank you, Yang Berhormat Honourable Member for Meradong. Despite the urgency and potential risk, the public safety in the existing site our proposal to the new industrial estate was not approved under the Mid-Term Review RMK-11. However, Yang Berhormat Datuk should not be disheartened as you have to believe in the power of repetition. If you can use what we call an autogenic conditioning technique you can visualize it, you can mobilize it and emotionalize it eventually we can visualize it. I always believe in positive thinking a vision can be translate into reality eventually. Therefore, my Ministry will submit the proposal for the new project site again for consideration in the RMK-12.

Thank you.

YB Datuk Ding Kuong Hiing (Supplementary Question) Thank you Tuan Speaker, Thank you Assistant Minister. Thank you for keep trying for the people of Meradong. I have two supplementary questions here.

(a) What is the size of the proposed Meradong Industrial Park?

(b) What is the estimated project cost and what are the components of the proposed projects?

Thank you.

Malcolm Mussem anak LamohPRS · GPSJunior Minister of Industry and Investment · Batang Ai

Thank you, The Honourable Member for Meradong. Tuan Speaker, our Ministry has proposed an initial area of 50 hectares for the new Meradong Industrial Park which could be expanded as the need arises in the near future. With regards to the estimated cost of the project it was estimated at RM14 million and the component include the basic infrastructure be road, concrete drainage, water and power supply as well as the civil work for telecommunication and other subservices.

Thank you.

Mr SpeakerEN

The Honourable Member Encik Johnichal Rayong Anak Ngipa for Engkilili.

Thank you, Mr Speaker.

Surveying the Perimeter of SALCRA Participants' Land in the DUN Engkilili

(150) YB Encik Johnichal Rayong Anak Ngipa asked the Minister of Agricultural Modernisation, Native Customary Land and Regional Development. When will the Government survey the perimeter of the land of SALCRA participants and subsequently grant them land title deeds for land that has been cultivated for a long time in the areas of San Semanju, Merindun and other areas in the DUN Engkilili?

Datuk Roland Sagah Wee InnPBB · GPSJunior Minister of Native Customary Land Development · TaratEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Engkilili. For the information of the Honourable Member for Engkilili, there are two estates involving landowners from the DUN Engkilili area, namely the Lemanak Oil Palm Estate and the Sedarat-Memaloi Oil Palm Estate.

Their participation in the first cycle of the project, that was the first planting cycle implemented in the mid-1970s, was on a communal basis. It was a community-owned project. Not individual. And therefore, the land was not measured individually for the issuance of land titles.

However, after the 25-year period of the project's first cycle ended, they agreed to continue the project with a second cycle, namely replanting, and asked SALCRA to measure their land for individual ownership.

The measurement work has been carried out since 2010. Several areas involving longhouses, such as Rh Adeng Semueh, which is 37.6 hectares, Rh Awing Merindun (264.61 hectares), Rh Erak Merindun (110.92 hectares), Rh Melintang/Sintan (281.35 hectares), Rh Ngilah Bara (195.33 hectares), Rh Sibat Inggol (109.74 hectares) and Rh Sujang Samueh (105.39 hectares), have been completed and survey pickets have been placed by the SALCRA survey unit.

The records of these survey pickets have been progressively submitted since 2016 to the Sarawak Lands and Surveys Department for the land title issuance process.

So far, 628 lots involving 1,190.57 hectares have been survey-picketed by SALCRA. Of this total, 378 individual lots have been measured by the Lands and Surveys Department, of which 249 lots have already been issued with land titles under Section 18 of the Land Code.

For the Merindun Block, which is located within the boundaries of the SALCRA Lemanak Project, 188 lots have been measured individually, of which 132 land titles under Section 18 of the Land Code have been issued.

Meanwhile, land measurement work under the SALCRA project and other areas, including San Semanju, will be carried out according to the replanting or replanting rotation.

Thank you.

(Supplementary Question) Thank you, Honourable Deputy Minister. Mr Speaker, I have two supplementary questions.

(a) What steps will be taken to expedite the issuance of these land titles?

(b) How many land titles have been issued to SALCRA project participants in the DUN Engkilili area?

Datuk Roland Sagah Wee InnPBB · GPSJunior Minister of Native Customary Land Development · TaratEN

Thank you, Mr Speaker, and thank you to the Honourable Member for Engkilili. For the information of the Honourable Member, the Ministry has directed SALCRA and the Sarawak Lands and Surveys Department to issue land titles. For the remaining land that has not been measured across the entire SALCRA development area, within a period of two years. And it has been planned that SALCRA and the Lands and Surveys Department will hold a meeting soon to resolve this matter and find strategies to expedite the measurement and issuance process of land titles.

For the second supplementary question, as of 30 September 2018, the Lands and Surveys Department has measured a total of 378 individual lots. Of these, 249 lots have already been given land titles under Section 18 of the Land Code. Meanwhile, the remaining 129 lots have not yet been issued land titles.

Thank you.

Mr Speaker

Ahli Yang Berhormat bagi Pending.

Traffic Congestions and Massive Traffic Jam Problem

(151) YB Puan Violet Yong Wui Wui bertanya kepada Menteri Pembangunan Infrastruktur dan Pengangkutan.

(a) Why is there no action taken thus far to reduce the traffic congestions and solve the massive traffic jam problem along Jalan Tun Razak Kuching?

(b) What are the Ministry’s reasons/excuses for not tackling the problem all these years?

Datuk Dr Jerip Anak SusilPBB · GPSJunior Minister of Transport · Mambong

Terima kasih, Tuan Speaker. Thank you to the Honorable Member from Pending.

Let it be understood to the Member from Pending and also the Members of august House that the traffic jam in the city of Kuching is not just peculiar to Jalan Tun Razak but throughout the whole city of Kuching which includes the Matang area, Kota Samarahan area, along the Kuching/Serian road and even Bau/Kuching road. And that is in view of the fact that the Kuching city population have increased from 750,000 that was five years ago to almost a million with regards to a greater Kuching to include Kota Samarahan and the Padawan Municipal Council. And with this increased population of course, we can expect traffic congestion in many of this city parts of Kuching. However, Tun Razak is the stretch of road of a four kilometres is the major thoroughfare in the city of Kuching and this road is a Federal road and the State has taken intiatives to regularise traffic flow in reducing the congestion there. But bear in mind that, that stretch of four kilometres is a major thoroughfare. At the end of it is the Borneo Convention Centre and the other end of course are the major Government office complexes. So you can imagine a major traffic jam during office hours.

And now we have put in placed a smart traffic light system along that road, particularly at the Foochow Road junction and Sungai Apong. Now, JKR has actually submitted a proposal to do some upgrading there along the junction of Foochow Road and the Tun Razak under the mid-term review of the 11th Malaysia Plan. However, it was not approved.

Thank you.

Puan Violet Yong Wui WuiDAP · PHPending

Thank you, Assistant Minister. Saya juga berharap Gabungan Parti Sarawak (GPS) Kerajaan dapat memberi perhatian kepada keperluan rakyat yang tinggal di bandar. Please do not be too prejudiced to the need of the people staying in the city.

My question, last year, I believe the Minister for Infrastructure, Development and Transportation had in this august house during his winding up speech, spoke about assigning the traffic police to control the traffic flow at all the major traffic light intersection. But I don’t see that happening, even though he made this suggestion or solution in this august House. So can I have his Assistant Minister to enlighten this august House why is this not happening and why is there no traffic police to control the traffic flow.

And a lot of the urban folks are feeling quite frustrated over this issue, this problem I have raised this issue many, many times. If I am not mistaken, not less than five times and I don’t see any progress at all. Though just now Assistant Minister mentioned about the smart traffic light that has been installed but that doesn’t really improve the situation. So can I get JKR Sarawak to review the effectiveness of this system?

Thank you.

Datuk Dr Jerip Anak SusilPBB · GPSJunior Minister of Transport · Mambong

Thank you, Tuan Speaker and thank you to the Honourable Member from Pending. The GPS Government have no intention to discriminate residence in the urban area. In fact, we take seriously any problems with regards to the traffic congestion in the city.

And traffic congestion in the city is indicative of the well-being of economic development because as we begin to grow and as modernity starts to creep in, people are able to buy cars and also people are able to purchase personal vehicles by themselves and so we can expect more traffic congestion in the future. And this is not just happening in Kuching itself. May I remind the Member from Pending, that this is happening all over the world in major cities like Tokyo, New York and even in Singapore. Even with how advanced the public traffic system, traffic congestion do occur.

Now, let me just bring to the point that the request for traffic police to be manning all traffic junctions. Bear in mind that we have 140 traffic junctions all over in Kuching and we have communicated with the Traffic Police Department, and the common answer is that, “we dont have enough traffic police”. But we do concentrate on certain traffic junctions which are very very critical particularly that in between Simpang Tiga, at Tabuan and Batu Lintang. And we are requesting as well that in view of Tun Razak’s junctions particularly at the one that is near Sungai Maong and also Foochow. That is also a very critical junction. We are requesting them to put the traffic police there. We hope that as we follow up, they will comply with our request. But, bear in mind that as you mentioned just now, Member from Pending, that the smart traffic light control system is actually helping us in some way.

From our studies, at that particular junction we have one, based on our analysis, if a traffic car comes in at peak hours it takes him 616 seconds without the smart traffic control system, without that. Now after we placed that system, we found out that the time of reduction of waiting when the traffic comes and meet the junction is reduced by more than 51% i.e: 301 seconds. Meaning that there is indeed marked improvement.

In most of the junctions where we installed these traffic light systems, the time of travelling from that junction has improved by a minimum of 35% to 60%. In other words, it has a lot of effect. We hope that as time goes by, more of this system can be in place in most of the junctions but there is as indication that is actually very effective to our system for the time being.

Do you have any other questions? You have already two questions isn’t it. One is the traffic. One is this one. No more already. Never mind. Some more.

Puan Violet Yong Wui WuiDAP · PHPending

Assistant Minister, thank you for giving me this opportunity to make some observations here. It’s just that when you were mentioning about the smart traffic light system, it has actually caused quite a massive jam now at this Three Hills Park, Jalan Three Hills Park especially during the evening hours. So I don’t know because I have received quite a number of feedback that the jam will start from the begining of Jalan Three Hills Park towards the traffic light junction. So maybe there should be some fine tuning to the system.

Datuk Dr Jerip Anak SusilPBB · GPSJunior Minister of Transport · Mambong

Yes, thank you for that information. We will review that input and we will see why that has occurred.

Thank you.

Mr SpeakerEN

The Honourable Member for Samalaju.

Encik Majang Anak RenggiPRS · GPSSamalajuEN

Thank you, Mr Speaker.

Construction of a Secondary School and a Primary School in Samalaju

(152) YB Encik Majang Anak Renggi asked the Minister of Education, Science and Technological Research. What is the status of the Government's proposal to build a secondary school and a primary school in Samalaju?

Dr Haji Annuar bin Rapa’eePBB · GPSJunior Minister of Technology Education and Research · Nangka

Terima kasih, Tuan Speaker dan juga Yang Berhormat bagi Samalajau. Saya ingin mengucapkan selamat datang kepada Jawatankuasa Pergerakan Wanita PBB Tupong yang hadir bersama kita pada pagi ini. (Applause)

For the information of Yang Berhormat, the SK and SMK Samalaju was approved under the Eleventh Malaysia Plan and today on the 8th of November, the SK Samalaju tender will be opened. Whereas the SMK Samalaju is still under the design process.

Thank you.

Encik Majang Anak RenggiPRS · GPSSamalajuEN

(Supplementary Question) Thank you, Mr Speaker. I am satisfied with the answer given by the Honourable Deputy Minister just now. So here I have two supplementary questions to be put to the Honourable Deputy Minister.

(a) What is the scope of work and the estimated cost for the construction of both of these schools?

(b) How can the RM1 billion allocation from the Federal Government be used for schools in the state of Sarawak?

Dr Haji Annuar bin Rapa’eePBB · GPSJunior Minister of Technology Education and Research · Nangka

Terima kasih, Yang Berhormat. Saya ingat dia puas hati tak ada soalan tambahan, tapi ada dua soalan tambahan.

Walau bagaimanapun, Yang Berhormat, untuk skop sekolah SK Samalaju dan SMK Samalau ialah yang sedemikian. Untuk SK Samalaju kita akan bina 24 buah classroom termasuk sebuah hostel yang boleh menempatkan 200 pelajar dan 24 unit teachers’

quarters dan juga facilities yang lain. Sementara SMK Samalaju, kita akan bina 36 kelas, hostel yang boleh memuatkan 300 pelajar, 24 unit kuarters untuk guru dan juga facilities yang lain. SK Samalaju akan menelan belanja RM56.4 juta sementara SMK Samalaju akan menelan RM79.8 juta.

Ingin hendak saya jelaskan di sini Yang Berhormat bahawa jumlah ini memang berbeza mengikut tempat dan juga keperluan sekolah tersebut. Mungkin semalam ada yang mempertikaikan mengapa kita membina sebuah sekolah berharga RM40 juta untuk 250 orang pelajar. Kita tidak boleh menggunakan jumlah pelajar sama dengan jumlah yang diperuntukkan disebabkan ada keperluan lain.

Mungkin dari segi infrastructure nya berubah, perlu pembinaan hostel. Ada setengah sekolah tidak perlu pembinaan hostel. Jadi harganya mungkin murah sedikit. Dan juga yang paling penting, Yang Berhormat, kita mesti menyediakan satu ruang untuk masa depan. For future expansion. Bukan hanya untuk 253 orang tersebut.

Saya haraplah Menteri, Timbalan Menteri tidak ada pada hari ini, iaitu Yang Berhormat daripada Kota Sentosa supaya mempunyai pemikiran yang lebih panjang. For future generation. Bukan hanya untuk pada hari ini sahaja. You are the leader. You should plan for the future. Bukan untuk ini sahaja. Jangan hanya mengatakan 253, mengapa RM40 juta. Tidak diperlukan. Jadi ini tidak betul, Yang Berhormat. Sebab itulah apabila kita melihat … (Interruption) Can I be interjected? I’m answering the question. I cannot be interjected; I’m answering the question. I’m not doing the winding. I’m not debating.

Jadi, Yang Berhormat, kita kena prakmatik sikitlah dengan keadaan ini. Jangan menuduh bahawa ini ATM machine untuk YB-YB daripada GPS. Ini satu tudahan yang liar. Yang tidak berasas sama sekali. Buruk sangka. Hati hitam. Macam-macam lagi boleh saya sebutkan di sini.

Yang Berhormat, untuk soalan yang kedua. Di manakah RM1 billion? Ini pun dipertikaikan semalam.

Let me answer this question with details of the numbers which I have here. I have to clarify this carefully because it’s in the paper today. It’s question number two. Listen the answer. Question number two, the supplementary question. Okay. He’s asking where is that RM1 billion. Okay. The RM1 billion has been approved by the year 2017 for 2018/2019 allocation. RM500 million for 2018. RM500 million for 2019. Understand? Am I clear with that? RM500 million this year, RM500 million 2019. Okay. And we have spent RM460.5 million this year for 116 schools. (Applause) If you divide that, it’s about RM3 to RM4 million each school. And among that almost all have been completed which is by JKR. All completed. For KPM, 25 schools have been completed. And yesterday, Minister of Economics allocated RM10 million for one school.

So what’s the problem of RM20 million being accused that we had inflated for the cost these sekolah daif. It is not true and out of that I want to make it clear that for the whole of these… (interruption…) Dengarlah dulu, if you don’t want to hear then you cannot get the proper answer from me. I am not angry. I am trying to explain because so much explanation has been done but cannot go through your brain.

Please don’t politicise education. Don’t try to gain mileage from education. Let us work together. You listen first. Now we have 415 dilapidated schools, because of these RM500 million allocated, we are able to manage to rebuild, to repair 166 already but your Pakatan Harapan has cancelled the RM500 million next year and give only RM100 million for the whole of nation. This should be highlighted by you. This should be highlighted, where is that RM500 million and I can tell you that RM500 million this year doesn’t go to State

Government, it goes to KPN (Kementerian Pendidikan Negara) and JKR, nothing to do with the State Government.

Thank you very much, Tuan Speaker.

Mr SpeakerEN

Honourable Members, question time is up.

Motion from Ordinary MembersMotion

Mr Speaker

Tuan

Speaker

Ahli-ahIi Yang Berhormat, I have received a motion dated 7th November 2018 from the Honourable Member for Tanjong Batu under Standing Order 15. I shall now call upon the Honourable Member for Tanjong Batu to read up his motion.

Encik Chiew Chiu SingDAP · PHTanjong Batu

Thank you very much Tuan Speaker. Last night after a heavy pour in Bintulu, at about 12 o’clock in the morning about 100 houses at Taman Desa Damai, Jalan Sibiew, Bintulu were flooded after a half hour rain. Some houses were flooded up to four feet high. The flood had brought much losses to the people of Taman Desa Damai, it could even be life threatening as the flood comes as quickly and it was pitch dark at night.

Opposite Taman Desa Damai, at Pine Avenue mud had aslo flown almost into the houses there. The matter needs urgent attention as rain are so unpredictable during this rainy season and it could happen again tomorrow.

Immediate actions much be taken to safe guard the people staying at Taman Desa Damai and Pine Avenue. The whole drainage system is not helping the people there, in fact it is hurting them, immediate and drastic action must be taken to solve the problems once and for all, as the authorities concerned had failed to help and protect the people there.

Mr Speaker

Ahli-ahli Yang Berhormat, this motion seeks for an immediate action to be taken to safe guard the people staying at Taman Desa Damai and Pine Avenue whose houses were flooded due to heavy down pour on the 7th November 2018 at 12 o’clock in the morning.

This motion is made under Standing Order 15, whereby under this Standing Order only a matter which is of definite, urgent and of public importance can be moved by a Member of the House for an adjournment other than under Standing Order 14. However, it is to be noted that the issue brought may be definite and of public importance but it does not fulfill the ingredient that it is urgent under Standing Order 15.

I had received a reply from the Ministry of Local Government and Housing dated 7th November 2018 on this matter.

Let me read out the reply:

“Bintulu Development Authority (BDA) is already aware of the situation at Taman Desa Damai area. To-date BDA had already awarded the tender for the construction of two metre wide concrete drain with a total length of 1.66 kilometres along Jalan Sibiyu, opposite sites of Taman Heng and Taman Desa Damai in order to address flooding problem in that area. The project is, the cost of the project is RM3.895 million.The construction is expected to commence on 21st November 2018 and the project will take 10 months to complete.”

Therefore, the question has been addressed, there is no more urgency, motion is dismissed.

Encik Chiew Chiu SingDAP · PHTanjong Batu

Tuan Speaker, could you please reconsider because the time period taken to complete this project will be a long time and meanwhile rain can come and flooding could occur anytime. And I think we should adjourn this Dewan so that we can talk about alternative ways and in the short term how we can overcome this while they are still in the project.

Thank you, Tuan Speaker.

Mr Speaker

We had received the assurance that work will commence on the 21st of this month.

SAMBUNGAN PERBAHASAN ATAS BACAAN KALI YANG KEDUA RANG UNDANG-UNDANG PERBEKALAN (2019), 2018 DAN USUL UNTUK MERUJUK RESOLUSI ANGGARAN PEMBANGUNAN BAGI PERBELANJAAN TAHUN 2019

Mr Speaker

Ahli-ahli Yang Berhormat, under Standing Order 31(8), I hereby impose 20 minutes for any Member who wishes to speak. I shall call upon the Honorable Member for Tupong.

Thank you, Mr Speaker. Bismillahir Rahmanir Rahim. Assalamualaikum Warahmatullahi Wabarakatuh, before I start my debate speech I would like to welcome wanita PBB N.6 Tupong for coming to this august House, the back bone and strength of PBB in giving the best community service in N.6 Tupong, welcome. And I would also like to welcome the student of SEGi College, the leaders of tomorrow and welcome to this august House.

Once again thank you Tuan Speaker for giving me this opportunity to debate on the Supply Bill. It gives me great pleasure and proud to be part of history. History will tell our children today marks a new beginning of a robust development in Sarawak with a record surplus budget of RM11 billion.

In 2015, our State budget was more or less RM8 billion, 2016 it was more or less RM8 billion, 2017 it was more or less RM8.1 billion, 2018 it was more or less RM8.1 billion and this year a record of RM11 billion. And every year more than 70% of the budget was allocated for development and more or less 50% was allocated for rural development.

Tuan Speaker, it is the responsibility of the Federal and State Government to allocate budget to develop the state as specified in the Federal Constitution. There is the Federal list and also the state list as stated in the Ninth Schedule. For example, yes, NCR perimeter survey is the responsibility of the State Government, but due to the understanding of the Federal Government on the utmost important of this program, and it is very close to the heart of the people Sarawak, previously, the Federal Government has assisted in giving the budget for the State Government to conduct these surveys. But now, it makes you wonder how the Federal Government look at we Sarawakian when one of the most important things for us Sarawakian which is the perimeter survey of the NCR land is not included in the National Budget.

We are grateful of all the development that has been done by the Federal Government but we also realise that we need more and faster development in order for us to be on par with our counterpart in Semenanjung Malaysia. Recently, the Prime Minister announced RM4.3 billion for Sarawak. I would like very much to know what exactly that RM4.3 billion is for.

If we look at the overall budget for development which is I'm talking about the Malaysian National Budget if we look at the overall budget of development which is RM54 billion, we are merely getting 7% out of the total development budget. We were hoping that our fellow Sarawakian in the cabinet could have fought for more budget for Sarawak, at least 30% out of the development budget. Regardless of the excuses given by the Honorable Member for Kota Sentosa, that we GPS being indirectly responsible for the economic condition of the nation.

Please understand, The Right Honourable for Kota Sentosa. We are talking about the existing budget allocated for development, which is the available RM54 billion. We are merely asking for more from that RM54 billion. Are we not equal partners? Are we Sarawakian second class citizens to the eye of the Federal Government? One seems to feel that way by looking at how we are treated if we look at the Malaysia Budget.

Tuan Speaker, I once mentioned in my debate requested for our Government, our Yang Amat Berhormat Chief Minister to look into an alternative ways on how to increase our State revenue. More revenue means we are able to, not only plan and develop what is responsibly ours to develop in the State list but now we have no choice but to look also in the Federal list as well.

Tuan Speaker, Monday November the 5th marks a very special day for all Sarawakian, a day which depicts only a Sarawakian have the heart to really gives the best to all Sarawakian. A day which marks a record of RM11 billion budget and the ways in which Sarawak can increase its income as stipulated and govern by the Constitution. For that I would like to record my appreciation to Yang Amat Berhormat Chief Minister and I am confident with this approach, we will be able to leapfrog Sarawak to be on par with our counterparts in Semenanjung.

Mr Speaker, allow me to raise issues in my constituency. Among the issues that are very close to the hearts of youths is housing, a home that is affordable to own. Most young people who have just started work or just got married certainly aspire to have their own homes. That is why the announcement by the Honourable Chief Minister regarding the Program Rumah Pertiwiku has been very well received. We also hope that this programme can be expanded further beyond the locations announced by the Honourable Chief Minister. The DUN Tupong area, which is an urban state constituency, has certainly experienced population migration from rural areas, and the growth of existing families very much needs a programme like this. The Matang area is also very suitable for implementing this programme, Mr Speaker.

We would also like to express our deepest gratitude for the announcement of RM1,000.00 for every newborn baby, to begin next year. God willing, Mr Speaker, I will try my very best to obtain that RM1,000.00. I will discuss it with my wife.

So, Mr Speaker, esports has become increasingly popular among youths in the State of Sarawak. The competitions held offer prizes amounting to hundreds of thousands of ringgit, and at the international level reach millions of ringgit. Apart from being seen as a sport in which the benefits of playing it can be achieved, it can also be seen as an opportunity to generate income if we look at its eco-system. It can open up a new industry or upgrade existing industries. Esports centres can generate income for their operators.

However, the issue faced by operators of these centres is that such centres are categorised as entertainment centres under the by-laws of the Local Authority. We are also aware that there are irresponsible operators who use entertainment centre licences to run online gambling operations, and this affects applications by esports centre operators who genuinely wish to run these operations.

So I ask that the Ministry genuinely look into this and give feedback during the winding-up on how we can strengthen the existing by-laws on this matter so that we can provide room and opportunity for these esports operators.

With such rapid technological development, online gambling has also evolved very quickly. In the past we often heard complaints of large crowds of visitors going to electronic entertainment centres to gamble using the machines there. Government agencies also swiftly controlled and took action against this matter. But now, a person need only go to a sundry shop that sells only mineral water but operates 24 hours to buy top-up credit, reload, and use their mobile phones to gamble online. This matter must also be taken seriously and regulated because it will bring about many negative consequences for the local community. I have received many complaints about this matter and I am confident that fellow Honourable Members elsewhere also face the same issues and challenges.

Mr Speaker, recreational fishing as a hobby has great potential to be developed into a tourism industry and an economic source for local boat owners. In Kuching alone there are more than 100 boats, and their owners carry out activities renting out their services to take anglers out to sea. They face difficulties in registering because there is no specific category for them. For example, if they want to register as a Persatuan Nelayan Kawasan (Local Fishermen's Association), they must be full-time fishermen, but they are not full-time fishermen.

At times they have problems buying fuel at petrol stations because they are not permitted to, and even if they are registered, they are only allowed to buy no more than 250 litres, while their needs exceed that.

Mr Speaker, so they have problems carrying out their activities and problems generating their income. Given that the activity has very great potential to be expanded, I ask that the Government help coordinate and facilitate this activity as it did before in the process of developing homestays some time ago. Once there is an orderly system in terms of registration, training and so on, it will be easier for them to expand this industry.

Mr Speaker, I would also like to take this opportunity to thank the Honourable Chief Minister for approving Kampung Gita Laut Sungai Maong as an extension village. In this regard, I would like to request that the rural electricity supply programme and water supply programme be implemented in that village as quickly as possible. Apart from Kampung Gita Laut Sungai Maong, additional rural electricity supply projects are also needed in Kampung Gita, Kampung Paroh and also Kampung Sejijak. I ask for the Government's attention.

Previously I had discussed with the Department of Irrigation and Drainage (DID), a Federal agency, regarding the construction of drainage for the N.6 Tupong state constituency.

Among the locations we discussed are Jalan Matang Baru, Taman Sejoli, Jalan Matang/Batu Kawa, Taman Malihah and Kampung Pinang Jawa Fasa 2. I would like to request feedback on the status of the above-mentioned projects. Previously I was informed that some of the projects I mentioned earlier had already been approved, and if these projects are now cancelled, I ask that the State Government be able to take over those projects.

Kampung Sagah in the N.6 Tupong area frequently experiences very low water pressure. Mr Speaker, therefore I ask that the Government identify this problem and find a solution. Among the main issues in the N6 Tupong area is telecommunications and internet coverage, which is also often raised by the people of the N.6 Tupong state constituency, particularly in the areas of Kolong 1, Kolong 2, Sungai Tengah and Kampung Sagah. These areas are located along Jalan Matang and Jalan Matang/Batu Kawa, Mr Speaker.

In addition, like other fellow Honourable Members, drug abuse is among the main challenges in N.6 Tupong. I often liaise with the National Anti-Drugs Agency (AADK), and they also share the challenges they face. Among them is not having sufficient places to accommodate these patients. Because there are not enough places, most of them have to be released but under supervision, whereas these patients need to be placed in rehabilitation centres. So I ask that the State Government work closely with AADK in terms of finance to ensure that the operations and functions of AADK can be carried out fully.

Although I had once organised a programme together with AADK, I was given to understand, Mr Speaker, that it was merely rumour from Kuala Lumpur that AADK was not permitted to get involved with the GPS State Assemblyman, but that is just rumour, Mr Speaker.

The Belia Metrocity Night Market is among the very active night markets. 80% of its traders are youths in Kuching. Currently they operate at Metrocity, and so far the occupants of the buildings at Metrocity are not very many. I expect that in a few years these buildings will be fully occupied and this will create problems for building occupants and also night market traders. Therefore, I would like to request that the Government provide a site near the existing site so that we can plan development for these traders.

Mr Speaker, I once again propose that the Government study and implement an insurance scheme or medical card for particular groups, especially those registered with the Welfare Department (Jabatan Kebajikan). Medical costs are indeed free at Government hospitals, but sometimes the cost of buying iron rods, screws or other equipment has to be borne by patients. Those who are no longer able to afford it find it very difficult to buy. Perhaps the monthly cost of the medical card or insurance in some cases is under RM100.00 a month. Perhaps the Government could negotiate with insurance companies to offer better prices for the sake of our people who are in the poverty bracket. At least with a medical card they would not need to go to the hospital and would have other options: private hospitals and private clinics. At least it would ease the burden currently faced by Government hospitals.

Transport

The last issue I would like to raise, Mr Speaker, is public transport. We often see our younger brothers and sisters, and people in rural areas and also in the outskirts of towns, using vans, rented vans and buses to go to the market, to town or to the hospital. These people are certainly from the group that cannot afford it; if they could afford it, they would certainly use cars or motorcycles. It is clear that they cannot afford it. I hope that our Government, which is caring towards the plight of these groups who cannot afford it, can plan a programme under which we can offer free bus services to these groups, or offer free van services to them, or offer a subsidy programme for express buses for those who travel from Miri to Kuching, Miri to Sibu, or Sibu to Miri. Perhaps we could look at this, because I am sure that those who cannot afford it, if they could afford it, would certainly use other transport. Certainly, those who use these land services, I do not say all of them, but most of them are from the groups with less means, and certainly the Government wants to help these groups who cannot afford it. My suggestion, among the programmes we could use to help them, is to offer or plan free transport services.

So once again I would like to express my deepest thanks to Mr Speaker for giving me the opportunity. And I would like to take this opportunity to wish a Happy Deepavali to my friends and family and to all the people in Malaysia who celebrate Deepavali.

That concludes my speech, wabillahitaufik walhidayah. Assalamualaikum warahmatullahi wabarakatuh. I beg to support.

Mr SpeakerEN

The Honourable Member for Lingga.

Assalamualaikum and salam sejahtera. Thank you, Mr Speaker. First of all, I would like to extend a thousand thanks and congratulations to the Honourable Chief Minister for tabling the 2019 Budget in this honourable House, where it is a State Budget that makes history as the first budget of the Gagasan Parti Sarawak (GPS).

Going to Sri Aman to cast nets, Caught a catfish in one throw; A fair budget, the people prosperous, Blessed by GPS's brilliant vision.

Congratulations also to the Minister of Finance of Malaysia on tabling the 2019 Budget on 2 November last year. But Mr Speaker, I am disappointed that the lower attention given to the State of Sarawak and Sabah in the 2019 National Budget is far lower than the states in Peninsular Malaysia. This disparity clearly reflects the indifference of the Pakatan Harapan (PH) Government towards Sarawak, simply because Sarawak is governed by GPS. It is also seen as not in line with the statement of the Honourable Prime Minister in the mid-term review of the Eleventh Malaysia Plan (RMK-11) last time.

This is the true picture of the Federal Government that the people chose in the 14th General Election (PRU14). It is one that plays a great deal of politics and makes the people victims of politics, rather than developing this State of Sarawak. Because of political differences, the people of Sarawak have become victims of the PH Government and PH Sarawak. It must be emphasised here that we in Sarawak are part of the formation of Malaysia, and the terms enshrined in MA63 must be fulfilled. This includes a fair and balanced budget allocation for the State of Sarawak. This is important for the sustainability of the development of the State of Sarawak and Malaysia as a whole.

Mr Speaker, looking at the substance of this State Budget, it shows a clear direction regarding the focus of the State Government's development efforts towards "people centric" and "rural centric development".

These two main pillars are very important in planning the sustainable development of the State of Sarawak, and when we rely on these two main pillars, we will never be wrong in making decisions, which will ultimately lead to the prosperity and well-being of the people of Sarawak as a whole.

Although we are faced with global economic uncertainty, the Honourable Chief Minister has strategic steps, by providing the best allocations for development, so that the desired economic growth and development are achieved.

The faith and sincerity of the Honourable Chief Minister in administering and bringing Sarawak to become a developed and prosperous state need no further questioning. The willingness of the Honourable Chief Minister of Sarawak to continue the allocation of the RTP, for example, clearly shows that the GPS Government always prioritises its promises in reducing the development gap between urban and rural areas. That is why the Honourable Chief Minister continues to place the main emphasis on the development of the State of Sarawak, with a higher allocation for development expenditure amounting to 76% of the total budget. Of this amount, 67% is allocated for rural development.

Mr Speaker, the announcement by the Honourable Chief Minister in the previous budget tabling, regarding the construction of the Batang Lupar bridge, together with three other bridges that will be built next year, is good news for the people in the Lingga state constituency in particular. At the same time, it opens a new chapter for the network of coastal roads in Sarawak. After the cancellation of several people's projects by the Pakatan Harapan Government, including the postponement of the Batang Lupar bridge construction by the Pakatan Harapan Government, the Honourable Chief Minister decided to finance the entire construction project of this bridge, which is estimated to be worth RM1 billion.

Previously, Mr Speaker, under the previous Government, the cost of this proposed construction was borne 50% by the Federal Government and 50% by the State Government. But when there was a change of Federal Government, many high-impact people's projects were cancelled, and this affected the people, especially those living in rural and interior areas. Hearing the announcement by the Honourable Chief Minister that he will fully finance this project, my people are very happy with this announcement and hope that it will be implemented immediately. I am confident that the Batang Lupar bridge will make its own history as the longest bridge in Sarawak spanning a river after the Batang Sadong Bridge.

This shows us that the State Government is a responsible government that is sensitive to the needs of the people of Sarawak. In other words, it is also in line with the catch up plan, where the Socio-Economy Transformation Plan (SETP 2016 – 2030) policy aims to make Sarawak a developed state by 2030.

Eating bananas at Teluk Lang, Pisang Badat is sweet in taste, A balanced budget, a glorious state, The economy grows, the people feel it.

Education Issue

Mr Speaker, last week during the tabling of the 2019 National Budget, we were deeply saddened that the Federal Government did not specify any particular allocation for the repair of dilapidated schools in Sarawak. If this continues with no specific allocation, what kind of society do we want to shape and produce? We are well aware that the condition of school infrastructure in Sarawak, especially in rural areas, is very distressing. I describe it as 3B, "Beringgut, Bergoyang dan Bocor" (Leaning, Swaying and Leaking). Are we willing to see our children studying in such dilapidated schools? The education issue, especially dilapidated and underdeveloped schools, remains a major problem in Sarawak, especially interior schools.

For example, in my constituency, SK Sembahyang is very dilapidated, including SK Saint Dunstant and SK Maludam, which need new buildings. The State Government had to intervene in the issue of dilapidated schools in Sarawak after the failure of the Federal Government, led by Pakatan Harapan, to provide appropriate allocations despite having promised several times. The Government of Sarawak has allocated a total of RM81.7 million for the repair of 1,020 dilapidated schools by providing water and electricity supply facilities in this State. I must emphasise here that matters concerning education allocations fall under the jurisdiction of the Central Government. I call on the Central Government to give top priority to the problem of dilapidated schools and to allocate a higher amount to the State of Sarawak.

Mr Speaker, since forming its own government by not joining any pact or coalition after 12 June last year, the GPS-led State Government of Sarawak has continued to move forward without any restraint or being restrained in driving the economy and development of the State. The firmness of the Honourable Chief Minister in fighting for the rights of Sarawak as contained in the Malaysia Agreement 1963 (MA63) should continue to receive the support of the people of Sarawak. The rights of the people of Sarawak should be restored, whatever the circumstances and decisions, without any need for evasion after what was promised during the 14th General Election (PRU14) last time.

The decision of the State Government to impose a tax on petroleum products starting 1 January 2019 is seen as a bold, firm and proactive action in generating state revenue, after the discriminatory attempt by the Pakatan Harapan Government against the State Government of Sarawak, as shown in the 2019 Budget recently. The implementation of this tax will enable the State Government to receive tax revenue from petroleum amounting to RM3.897 billion next year. With this revenue from the tax, the State Government will develop Sarawak so that its progress is on par with Peninsular Malaysia.

Mr Speaker, the State Government of Sarawak's initiative to introduce a one-off payment to babies born starting January 2019 of RM1,000.00 is a long-term impact on those babies. This shows the concern and attentiveness of our Honourable Chief Minister regarding the financial problems of students when they pursue higher education later. More importantly, this effort shows that the well-being of the state is shared comprehensively by the people of Sarawak regardless of religious and racial background. Thank you, Honourable Chief Minister, for this initiative.

Planting cabik with kuci, Palak blooms and climbs the cupboard; The best GPS budget with vision, Sarawak harmonises the people.

Mr Speaker, allow me to touch on issues in the Lingga state constituency. Moving on to the issues circulating in the Lingga state constituency, which require urgent action and answers from the Government.

Water Issue

The Sekait area, Kampung Pangkat, Geran Sumbin including Tanjung Bijat, often faces the problem of low water pressure and water shortages. Sometimes there is water, sometimes there is none. This problem occurs because the water pipes in Sekait are often damaged, Mr Speaker, due to soil erosion on the riverbanks. What puzzles me is why these pipes are not maintained properly so that this problem does not recur and cause inconvenience to the local residents. Apart from that, dirty water problems often occur in villages in Sri Aman. Even SMK Lingga is experiencing water shortages, as well as in Meludam. What is the current status of the upgrading project in this area? I hope that the Government, through the Rural Water Supply Department, will explain to the people's representatives and the people about the progress of the project. This is to prevent the people from being toyed with, and we do not want the project to be regarded merely as a promise that never materialises.

Waterfront and Shophouse Project in Lingga

Apart from upgrading the water pipes, the issue of the market shophouses at the waterfront in Lingga also needs immediate attention, because both projects have already been brought to the attention of and approved by the Honourable Chief Minister, but until now there is still no sign of the next process, so much so that my people are asking when and what the outcome of the project will be. What I mean, Mr Speaker, is that I request that the project be expedited by the agency or body responsible. We do not want delays and failures of a project to have a negative impact on the Government and the people's representatives, to the extent that some question the efforts of the people's representative in the area.

Establishment of CENTEXS and Institutions of Higher Learning

Hearing that other places have been provided with CENTEXS, polytechnics, MRSM, community colleges and so on, I am saddened that such facilities are still not available in the Lingga state constituency.

It is not that we have never voiced this; in fact, it has been raised several times before in this honourable House. My request, Mr Speaker, represents the voices of the youth in my constituency, and I hope it can be considered, for the benefit and needs of my youth so that they can contribute their skills to the progress and development of the Lingga area.

Flood and Erosion Problems

This flood problem often occurs in Kampung Baru Hilir, Sri Aman, to the point that all houses in the affected area are flooded. Although several drains have been built in the area, they have not been able to overcome this problem, because some of the drainage systems that were built are shallow, and grass and mud in the drains are not removed and maintained properly, resulting in water not flowing properly and overflowing.

Therefore, I request the relevant agencies to step up efforts to carry out a comprehensive study, upgrade the drainage system in the affected area, build floodgates, maintain the existing drains, and take steps to build embankments of a certain height in line with the riverbanks, as in Kampung Hilir, Tanjung Engkabang, Kampung Hulu Sri Aman, Gran/Stumbin, Lingga and including Maludam. This will also strengthen the river barrier.

Clustered Village Industrial Development (PIDB)

Mr Speaker, in efforts to improve the socio-economy of the people in my constituency, I propose that the Clustered Village Industrial Development (PIDB) be established to help young people and women and single mothers. The PIDB concept has been successfully implemented in countries such as Thailand, Indonesia and in Peninsular Malaysia. For example, agricultural or small industry allocations are carried out by a group of residents or a neighbourhood. Through the Ministry of Entrepreneurship and Agriculture, their products can be marketed in large cities or exported. This initiative can be carried out by the state entrepreneur agency or the federal agency.

The time has come for us to look focused at local industries and skills. For example, in Lingga the land is fertile for agricultural cultivation such as coconut, banana and fruit. With more targeted allocation and guidance, Lingga will become known for bananas and other fruits, besides terubok fish and prawns.

Telecommunications Facilities

Mr Speaker, the problem of telecommunications coverage in the Stumbin, Seduku, Lingga and Maludam areas is very critical. For example, the tower in Stumbin has not functioned properly for a long time. In the areas I mentioned earlier, Mr Speaker, there are several national schools, and internet use is very important for them.

Therefore, I request that the Government, through the relevant telecommunications company, take immediate action to upgrade or improve these facilities in the area or in the village concerned.

Long House Financial Loan Assistance and Rumah Mesra Rakyat

Mr Speaker, in my constituency there are more than 50 long houses, and several of these long houses have applied for financial loan assistance, such as Rumah Panjang Sungai Pedada and Rumah Panjang Jeremy, Seduku, but until now they have not been approved. I would like to ask, is this assistance still being continued by the Federal Government, and what is the State Government's initiative to help long houses that wish to obtain these loans? I also request that the Rumah Mesra Rakyat (RMR) project for the second phase in Lingga be continued, including its construction in Maludam.

Affordable Housing

I hope the Government will expand the Affordable Housing Project announced earlier to my constituency as well, considering that many of my people, especially those on low incomes and those with families, really need these houses. In conclusion, Mr Speaker, before I end my speech, I once again emphasise to the people of Sarawak that the GPS Government today truly fights for the people, truly serves the people, and truly places importance on the welfare of the people with a prudent budget that is significant to the needs of the people. And with this, I extend my congratulations and millions of thanks to Mr Speaker for conducting this honourable House so excellently. With this, I support the Budget 2019 Bill this time.

That concludes my speech. Thank you.

Deputy SpeakerEN

The Honourable Member for Meluan.

Good morning and thank you, Mr Speaker. I would like to express my thousand thanks for being given the opportunity to take part in debating the motion to table the Supply Bill, (2019), 2018 by YAB the Chief Minister of Sarawak.

Indeed, the tabling of the Supply Bill, (2019), 2018 by YAB the Chief Minister on this occasion is very meaningful because it places great emphasis on infrastructure development, especially in rural areas.

I would also like to take this opportunity to congratulate and thank YAB the Chief Minister for the formation of the MA63 negotiating committee, which saw the committee comprising representatives from all the political parties in the State of Sarawak, regardless of ideology, in order to fight for the rights enshrined in MA63 to secure the future of the State of Sarawak.

Mr Speaker, as in previous sittings of the State Legislative Assembly (DUN), I have consistently raised several important issues relating to the DUN 48 Meluan constituency that I represent.

Agriculture

The Meluan DUN area is well known for the cultivation and production of very high-quality pepper. The fall in the market price of pepper since 2017 has caused very serious financial implications for pepper growers in the Meluan DUN area. The drop in pepper prices has left many growers burdened by the cost of purchasing agricultural inputs.

Therefore, I request that the Malaysian Pepper Board (MPB) and also the Sarawak Ministry of Modernisation of Agriculture, Native Land and Regional Development consider providing subsidies in the form of agricultural inputs such as fertiliser, insecticides and similar equipment, as one effort to help pepper growers in the Meluan DUN area maintain and improve the quality of their productivity, as well as to ease the financial burden they have had to bear as a result of the very drastic fall in pepper prices.

In addition, I also request that the Sarawak Ministry of Modernisation of Agriculture, Native Land and Regional Development establish a Pig Farming Area (PFA) in the DUN 48 Meluan constituency to help develop the pig rearing industry. This effort aims to meet high domestic demand and also has the potential to be exported overseas, especially to Singapore.

As I have stated in previous DUN sittings, the existence of a PFA such as the one in Paser Puteh, Simunjan will help livestock farmers in the Meluan DUN area diversify their economic activities so that they do not rely too heavily on agricultural produce alone as their source of livelihood.

The step of establishing a PFA in DUN Meluan will certainly create employment opportunities to curb the problem of migration to towns by rural residents due to the lack of employment opportunities.

Electricity Supply

I would also like to record my appreciation and thanks to the Sarawak State Government for implementing the Solar Power Project (SARES) in the Meluan DUN area.

The first, second and third phases have seen SARES successfully implemented in eight houses in DUN Meluan, while the fourth phase, which will be implemented in the near future, will see four longhouses in Meluan also provided with SARES facilities.

On behalf of the residents of the Meluan area, I would like to record and extend my thousand thanks and appreciation to the Honourable Dato Sri Dr Stephen Rundi Anak Utom, as Minister of Utilities Sarawak, for his concern and proactive action in tackling the problem of electricity supply in rural areas.

I also request that the Sarawak Ministry of Utilities continue to expand the implementation of SARES, especially in the remote areas of DUN 48 Meluan that are far from the electricity grid network, such as the Sungai Mujok area, which covers 13 longhouses, and the Ulu Sungai Kanowit area, which consists of four longhouses, namely Rh Kiroh located in Rantau Limau, Rh Sat in Selepong, Rh Jawang, Bukit Seri, and also Rh Ringgit in Apo.

In addition, I request that the Sarawak Ministry of Utilities also expedite the process of connecting electricity supply to residents who are within the electricity grid area, such as:

i. Rh Sang located in Ulu Entabai; ii. Rh Mary Ingkoh located in Jalan Ijit; iii. Rh Unggang located in Jalan Entabai; iv. Rh Suin located in Teberu; v. Rh Japar located in Nanga Kemalih; vi. Rh Kedit located in Sungai Buluh; vii. Rh Dana located in Munus; viii. Rh Minis located in Sungai Rau; and ix. Rh Kelambu located in Bekakap.

Treated Water Supply

As in previous sittings, I am consistent and once again appeal to the Sarawak State Government to build a High Level Pressure Water Tank at Bukit Agu, Julau to overcome the water problems frequently faced by 10,000 residents from 58 longhouses along the Jalan Entabai-Meluan. I also request that the Sarawak State Government, through the Rural Water Supply Department (JBALB), address the water supply problems faced by residents along the road from Nanga Engkamop to Nanga Entaih, Julau, which also houses a health clinic, a school and five longhouses.

Telecommunication Towers

First of all, I would like to extend congratulations and well wishes to the Sarawak State Government on the establishment of the Sarawak Multimedia Authority (SMA), which acts as the main body responsible for driving and implementing the development of multimedia communications, the digital economy and the Intellectual Property of the State of Sarawak. The establishment of the SMA by the Government is timely because it will drive the economy of the State of Sarawak towards a knowledge-based economy underpinned by the use of digital technology.

In this regard, I request that the Honourable the Chief Minister of Sarawak, as Chairman of the SMA, approve and also expedite the process of building telecommunication towers at Rh Sang located in Rantau Chire, SK Nanga Ju, SK Nanga Jambu, SK Ulu Entabai, SK Ulu Entaih, SK Nanga Maong, SK Lubok Asam, SK Nanga Ensiring, SK Nanga Sengaih, and SK Tapang Punggu, in line with the announcement made recently by the Right Honourable Chief Minister, which will see the construction of 600 additional telecommunication towers across the State of Sarawak, especially in rural areas, to overcome the problem of the absence of internet networks, which is the lifeblood of driving the digital economy.

The existence of an internet network will enable local residents to actively engage in e-commerce to promote their products, produce and eco-tourism destinations to the outside world. In addition, the existence of communication networks, especially the internet, will enable local residents to make use of the Sarawak Pay e-Wallet facility to carry out various daily transactions such as payments, money transfers and so on.

In addition, I also request that the SMA also organise empowerment programmes such as seminars, workshops and training to give residents of DUN Meluan exposure to the Digital Economy Initiative, Intellectual Property and other transformation initiatives, in order to instil understanding and foster the interest of rural residents, especially the youth, to take part in the Digital Economy.

Roads

I also once again appeal to the Sarawak State Government to approve and expedite the construction of the road from Nanga Entaih to Rh Sang located in Rantau Chire, a distance of 16 KM, to help local entrepreneurs, farmers and river fishermen transport their produce out for marketing. The existence of a road linking Nanga Entaih to Rh Sang will open up opportunities for other facilities to enter, including electricity supply and telecommunication towers.

I also request that the Sarawak State Government build a road from Kubu Brooke located in Nanga Meluan to SK Nanga Maong and to SK Nanga Ju, and then on to Rh Grasi, Ulu Mujok. The existence of a road linking this area will not only make it easier for residents of the area to transport agricultural produce out for marketing, but will also help curb the problem of boat capsizes that frequently occur during the flood season and also during festive seasons such as Gawai Dayak and Christmas, because the river route to this area is filled with rapids that are very dangerous and deep river pools.

In addition, I also hope that the Government will complete the road construction work from Nanga Entabai to Rantau Limau so that the road project is completed on schedule as stipulated in the agreement, because the construction of this road has taken a very long time to complete.

Upgrading of Schools

I also request that the Government expedite efforts to upgrade old schools, most of which are located in the interior of DUN Meluan and whose age, on average, has already exceeded half a century. Besides being upgraded, I request that these schools also be equipped with facilities such as ICT, hostels and complete educational equipment.

Eco-Tourism

Mr Speaker, I also request that the Sarawak Ministry of Tourism intensify its efforts to develop and promote the Julau District as one of the eco-tourism destinations or locations, considering that the Julau District is very rich in natural attractions such as forests, waterfalls and good rapids.

Mr Speaker, before concluding my speech, I would like to take this opportunity to wish a Happy Christmas to all the people of the State of Sarawak who will be celebrating it in December, and also a Happy New Year to all the people of the State of Sarawak, with prayers and hopes that we will together maintain the harmony that we all enjoy and, at the same time, unite in defending and fighting for the rights of our State as enshrined in MA63. Hereby I support the Supply Bill 2019 that has been tabled.

Thank you.

Deputy SpeakerEN

The Honourable Member for Beting Maro

Tuan Haji Razaili Bin Haji GaporPBB · GPSBeting MaroEN

Thank you, Mr Speaker. In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Allow me to take this opportunity to extend my congratulations and well done to the Honourable Datuk Patinggi Chief Minister who is also Minister of Finance, on the tabling of the 2019 Budget in this august House on 5th November 2018 that has just passed. I would also like to take this opportunity to record my congratulations to the Honourable Chief Minister on the conferment of the Honorary Doctorate of Philosophy in Economic Development by Universiti Malaysia Sarawak (UNIMAS) on 29 October 2018 that has just passed.

Mr Speaker, the tabling of the 2019 Sarawak State Budget in this sitting has created history, not only as the highest Budget ever tabled but also one that is expected to record the largest revenue of RM10.513 billion in 2019, with an expenditure surplus of RM122 million. Well done and congratulations to the Honourable Chief Minister.

Pokok Durian, Buah Langsat, Daun Selasih, Daun Sendayu, Bajet 2019 Impian Rakyat, Kepada Ketua Menteri, Terima Kasih, Thank You.

Mr Speaker, we are grateful that the 2019 Budget totalling RM11.914 billion, which is development-oriented and focuses on rural development, is an inclusive budget in line with the aspirations of the people. This Budget enables the Government to continue implementing proactive measures to develop rural areas for the well-being of the people.

This Budget allocates 76%, or RM9.073 billion, to development, designed to generate high economic activity to sustain a healthy level of economic growth in the state. The distribution of 67% of the development allocation, amounting to RM6.049 billion, for rural development is expected to expedite the provision of infrastructure facilities in rural areas.

The Chief Minister's initiative to allocate RM1,000 to every baby born in Sarawak starting next year is a good gesture to the people of this State. This savings can only be withdrawn upon reaching the age of 18. This shows that this Budget is forward-looking and has been prepared with the Government's responsibility in mind, not only to the present population but also to future generations.

Mr Speaker, as hoped by fellow Members of Parliament representing rural areas, we in DUN Beting Maro very much hope that the spillover of the 2019 Budget will be sufficient to develop and transform our area in Beting Maro into an urban area equipped with the basic necessities of the people such as roads, telecommunications, water and electricity supply, education and health, along with economic and social well-being.

We are fortunate to have a leader like the Honourable Chief Minister, who is visionary, ambitious, forward thinking, smart, and has high resolve and commitment to bring the people and the state of Sarawak to become a developed state with high income by 2030.

Issues and Needs of the People of DUN Beting Maro

Mr Speaker, allow me to raise several issues that require the attention of this House, especially those involving the needs of the constituency and the people that deserve attention and action.

Connectivity – Coastal Road and Telecommunications

Thank you to the Government, because the 2019 Budget will realise the development of a Sarawak coastal road network, complete with the construction of four bridges, namely Muara Lassa Bridge, Rambungan Bridge, Batang Lupar Bridge and Kuala Kemena Bridge. All of these proposed bridges were initially funded by the Federal Government.

On behalf of DUN Beting Maro, I express my thanks for the approval of the construction of Batang Saribas Bridge and Batang Krian Bridge, which will be implemented in 2019. I also hope the Government can upgrade the connecting road to Pusa/Kampung Batang Maro, as well as build a new road from Tanjung Lilin Beladin to Tanjung Asam. The implementation of this coastal road network, which has been long awaited, will certainly have a positive impact and open up economic opportunities for the people in coastal areas.

Apart from road networks, telecommunications and internet access are also important means of communication. Accordingly, I also request the Government to improve the telecommunications infrastructure in DUN Beting Maro by providing more telecommunications towers, broadband centres, WiFi and internet centres to enhance access and connectivity. The Government is also requested to implement electricity supply to houses and to areas that are still waiting.

Establishment of a Coastal Area Development Authority

Mr Speaker, I would like to take this opportunity, together with representatives of coastal people including the Beting Maro area, to propose to the Government that it establish a Coastal Area Development agency to implement, in a planned and focused manner, the development of coastal areas. These areas have peat soil and extensive coastal waters. The area is also rich in marine biodiversity resources and nipah forests that have not been fully explored. There are many settlements with large populations consisting of fishermen and farmers. They are the suppliers of fish and agro-food products to the people of this country. However, these coastal areas are still far behind in basic infrastructure facilities, especially clean water supply, electricity supply, telecommunications and agricultural infrastructure.

Therefore, I once again request that the proposal for the establishment of this body be seriously considered to realise the hopes of coastal people who want development in this area to be accelerated.

Clean Water Supply

Thank you to the State Government because the 2019 Budget gives attention to the supply of treated clean water. We all know that the Government has spent a lot of allocation to provide clean water supply infrastructure, but it is still not sufficient. Kampung Batang Maro, Rh Panjang Kam and Rh Panjang Duat still have not received treated water supply to date.

Strengthening Agricultural Development

I support the State Government's aspiration to become an exporter of agricultural produce and products to meet both domestic and global markets. This vision can be achieved by transforming agriculture into a modern, competitive and sustainable sector, capable of generating new innovative businesses and high-value employment opportunities. The agricultural sector needs to be modernised and commercialised through the use of advanced technology.

Coastal residents such as those of Beting Maro, who face difficulties in developing the agricultural sector, really need special attention from the Government. They urgently need agricultural infrastructure such as farm roads, irrigation and drainage systems, and embankments for the opening of agricultural land that is free from the threat of salt water. It is proposed that DUN N.29 Beting Maro, especially RGC Beladin, be elevated as an Integrated Agricultural Area, IADP, equipped with a modern irrigation and drainage system. This effort is expected to multiply agro-food production.

I request the Government and the Ministry of Agriculture, Native Land and Regional Development (MANRED) to develop DUN Beting Maro as an agro-food hub or foodbasket for the State of Sarawak. I want commercial agriculture such as MD2 pineapples, pandan coconuts, matag coconuts, takunan coconuts, as well as fisheries projects and the nipah industry to be strengthened.

To MANRED, I also wish to propose that the RM325 million allocation in this Budget be considered for implementing the following initiatives and projects:

1. Implement the IADP Coconut Plantation Project in the estuary area of Sg. Batang Saribas covering 1,500 acres in the areas of Kampung Batang Maro, Kampung Semarang and Kampung Sepinang;

2. Implement the IADP MD2 Pineapple Plantation Project in an area of 5,000 hectares in RGC Beladin, Sungai Muruk and Sungai Beras;

3. Implement the IADP MD2 Plantation Project in an area of 1,500 acres in the areas of Sungai Stru and Sungai Lamun, Kampung Pusa;

4. Implement and develop an Aquaculture Industrial Zone (ZIA) in the riverbank area of DUN Beting Maro;

5. Implement a programme for the release of high-value fish fry into water bodies and rivers in DUN Beting Maro;

6. Implement and develop the nipah and gula apong industry in Kampung Tambak;

7. Build and develop a Agricultural Produce Collection, Processing and Packaging Centre (CPPC) in RGC Beladin; and

8. Implement and expand the IoT-based Fertigation Project developed at Rampangi Food Production Permanent Garden, Kuching, to rural areas including Beting Maro.

Industrial Estate, Small and Medium Industry (IKS) Centre and Entrepreneur Pavilion

Mr Speaker, in line with the State's industrialisation programme, I request the Government to establish and build an IKS Centre and Entrepreneur Pavilion in Pusa and RGC Beladin for the convenience of entrepreneurs, especially young entrepreneurs among the youth in the DUN N.29 Beting Maro area.

Affordable Homes (RMM) and Spektra Permata Homes (RSP)

I welcome the Government's efforts to safeguard the well-being of the people through the provision of Affordable Homes (RMM) and Spektra Permata Homes (RSP) totalling 1,827 units in 2019 for the benefit of low-income groups.

Accordingly, I appeal to and request the Government to redevelop the old Pusa People's Housing Project that has long stalled, with focus on the construction of Affordable Homes (RMM) and Spektra Permata Homes (RSP).

Village Enlargement Scheme

At the same time, there is a need to implement a village enlargement scheme for Kampung Pusa, Beladin, Tambak, Spinang and Semarang within the DUN Beting Maro area. The provision of an orderly residential lot site equipped with infrastructure, and comfortable and affordable houses for the people. The Government is hoped to consider and approve this village enlargement project to enable the second generation of Beting Maro to own their own homes.

Rebuilding of SK Kalok and SK Tambak

I also welcome the Government's efforts to help resolve the issue of dilapidated schools in Sarawak. The condition of SK Kalok and SK Tambak, which are dilapidated and in a dire state, requires the Government's immediate attention. It is hoped that the Government can provide an allocation for the new construction of SK Kalok and SK Tambak. A site for the construction of the new SK Kalok has already been prepared.

NCR Land Survey

I also welcome the State Government's intention to continue the NCR Land Survey programme even though the Federal Government of Pakatan Harapan (PH) has not provided allocations as the previous Government did. Accordingly, I request the Government to survey the NCR land owned by the people in DUN N.29 Beting Maro.

Fishermen Assistance

Mr Speaker, fishermen are among the residents who are abundant in coastal and riverbank areas, including in DUN N.29 Beting Maro. They are among the groups that did not receive attention in the 2019 Budget of the Pakatan Harapan (PH) Federal Government. They need protection and assistance from the Government.

Recognising this situation and to ensure they are not marginalised, the Government, through MANRED, the Department of Fisheries and the Malaysian Fisheries Development Authority (LKIM), is advised to involve fishermen in supplementary economic activities such as aquaculture, high-value fish product production and agriculture, as well as skills training, in an effort to increase fishermen's sources of income, especially during the monsoon season.

Mr Speaker, before I sit down, I would like to say a few words about our friends on my right. Mr Speaker, I am very saddened by the political culture of "Bangau Oh Bangau, Katak Oh Katak" of the opposition, which continues to be displayed like a Cockatoo in a Golden Cage, inheriting the wisdom of its Mahaguru. The lifelong obsession with being in opposition cannot be eroded or eliminated, and is clearly displayed by PH politicians, including those who hold the reins of government and are titled Ministers.

Even after more than six months of winning the GE14 on 9 May 2018, their conduct remains as it was before. How could such traits be eroded so easily when they have become deeply rooted within them? In fact, they themselves do not know that their attitudes and behaviour are negative and have a thousand and one shortcomings, especially in our plural society in Sarawak, where any differences should be equally respected.

When "cornered", they cover up with political diversion and muddy the waters. Eloquence in speaking, expertise in twisting facts and skill in debate are used to create perceptions to conceal the flaws of their politics. What is clear, Mr Speaker, is that they cannot accept criticism, especially anything touching on the Government (PH). It is as plain as day, even on matters concerning the interests of the State of Sarawak, such as:

(a) The allocation of RM4 billion for Sarawak in the PH Government's 2019 Budget compared with the 30% promised by them, isn't it? Only RM4 billion was allocated;

(b) The cancellation of projects approved by the previous Government; and

(c) The failure to fulfil election promises as in the Manifesto of GE14.

"Hot Air". Who really is the "Hot Air"? When raised in this House, they display the political culture of "bangau oh bangau, katak oh katak". They are only good at finding excuses and blaming others. Suspicious, "denial syndrome".

Honourable Members of this august House. Is this the kind of representative we can expect to defend and protect our rights in Parliament? Oh, no! No! No! No! There is no hope! Paku Dulang Paku Serpih, Mengata Orang Dia Yang Lebih. If you cannot dance, do not blame the uneven floor. This may well be in line with the sarcastic remark of the late Tok Nan: "Blind of eye, deaf of ear, dumb of tongue."

Mr Speaker, I would like to take this opportunity to suggest that our friend beside me become a "gentleman parliamentary poly", eradicate the culture of "bangau oh bangau, katak oh katak", be forward thinking, look ahead, without prejudice. (Interruption…)

Deputy SpeakerEN

Ahli Yang Berhormat Beting Maro, you got one minute to wind up.

Tuan Haji Razaili Bin Haji GaporPBB · GPSBeting MaroEN

Mr Speaker, finally I would like to extend greetings of Selamat Menyambut Deepavali and Selamat Menyambut Maulidur Rasul to my Muslim brothers, Selamat Menyambut Hari Krismas to all Christians, Selamat Menyambut Hari Raya Cina to the Chinese community, and Selamat Menyambut Tahun 2019 to everyone. I will end my speech with two pantun:

Patah atap kerana buluh, atap dijalin dengan tali; patah sayap bertongkat paruh, namun undur pantang sekali.

The roof breaks because of the bamboo, the roof is woven with rope; a broken wing props itself up with its beak, yet retreat is never an option.

Negeri Sarawak, Ibu Pertiwi, Gunung Santubong, Hikayat Puteri; Datuk Speaker, tegas bijak bestari, perbahasan Bajet setulus hati.

Sarawak state, Motherland, Mount Santubong, the legend of the Princess; Datuk Speaker, firm, wise and sagacious, a Budget debate with a sincere heart.

Mr Speaker, with this I humbly move to support. Thank you, wabillahitaufik walhidayah. Peace be upon you, and the mercy and blessings of Allah.

Deputy Speaker

Honourable Member for Pending.

Puan Violet Yong Wui WuiDAP · PHPending

Thank you, Tuan Speaker, in May 2017, Sarawak State Government set up a Ministerial Portfolio called Integrity and Ombudsman under the Sarawak Chief Ministers Office for the purpose of tackling corruption and malpractices in the State. This is the first one set-up in Malaysia and everyone lauded the creation of it. To quote the Honourable Member for Jepak who is also the Minister-in-charge for this portfolio statement in his maiden speech. He had said, “Ombudsman function is to investigate and resolve dispute between the people and the Government and it ensures that the Government services are done effectively and without malpractice and corruption through the application of the principal of check and balance”.

In Sweden, where the practice of ombudsman originates in 1809, public complaints against malpractice in the public service and Local Government are handed by the Ombudsman. Unquote, all these statements sound pleasing to the Sarawakians but after one and a half years had lapse since its setting up, what a big disappointment, the Ministry had turn out to be until today we Sarawakians have not seen the Ministry deal with any corruption case. Let us be frank to ourselves, is Sarawak really free from corruption and

malpractices. Any decent person would know that corruption and malpractices are rampant in the State. I would like to ask the Honourable Minister from Jepak, what has his Ministry, why is his Ministry keeping silent over the infamous school deal relating to Jepak Holding Sdn Bhd on the award of the Solar Hybrid Project to supply electricity to 369 schools in Sarawak. The billion-dollar project was awarded by Sarawak State Government ex-boss, Tun Najib Razak via direct negotiation to Jepak Holding Sdn Bhd. This scandal was only exposed when Pakatan Harapan (PH) took over the Federal Power and through the instruction of Education Minister, Dr Mazli Malek who requested for an internal investigation. Hence, may I ask what has the Integrity and Ombudsman Ministry been doing when such a big project can be awarded through such sleazy means? Are you telling all Sarawakians that this is acceptable and nothing wrong about it? The boss of Jepak Holding Sdn Bhd is the right hand man for the Honourable Minister for Integrity and Ombudsman that is Honourble Minister from Jepak, is the Ministry trying to play a cover up for him? We can’t blame the people for lost confidence in the Ministry. “Sama-sama tidak boleh harap”.

Another case, is the most recent one that is the RM31 million Musical Fountain Project that is build right in front of our DUN Building and don’t your Ministry feel that RM31 million for such project is over price? We all know that all the parts in this Musical Fountain are made from China and it is impossible that it has to cost RM31 million to build this fountain. This is ridiculous, I can tell you there is nothing so special about this fountain. Like all normal fountain, it has only three basic components, water, lights and music. I don’t see any special effect that comes with fountain flame, no fire like the famous fountain in Dubai. I even got public feedback that the music doesn’t synchronize with the dancing water and lights. So it seems that the dancing water is enjoying its own dancing, whereas the music is playing at its own and the lights is flushing like nobody’s business and you tell me it has to cost tax payers money of RM31 million. I believe that if this contract is given to the industrial player or the local player through open tender, less than RM5 million it can be done. I believe the Honourable Member for Batu Kitang would agree with me on that because he is an engineer. That is a fair price less than RM5 million not RM31 million.

I was made to understand that there wasn’t any open tender called for this project which is parked under DBKU. During the construction stage, there wasn’t any projects signboard being erected too. What is ironic is that until today, the State Government does not dare to disclose the name of the company that constructed the so called RM31 million unsynchronized fountain. What is so secretive about this company. Auto Power Consultant Sdn Bhd. This is the first time I reveal the name of this company. Its called Auto Power Consultant Sdn Bhd. You ask the Chief Minister he doesn’t dare to answer. Why? What is there to hide? Why scared in disclosing the details? Don’t we all feel that something is fishy and abnormal is going on? Any reasonable person would think that RM31 million for such standard of musical fountain is definitely an inflated project sum, otherwise that ‘someone’ cannot get a “big chunk” out of it. Don’t ask me why this person? Don’t ask me why this happened? You go and ask the State Secretary, you go and ask and his friend by the name called Noble. Ask them, both of them has monitored the project very closely. You go and ask, if you want information about it, go and ask the State Secretary and ask his friend Noble. This two person, I don’t know someone also ask me when I was working, when I was visiting my constituency.

Deputy Speaker

The Honourable Member...

Puan Violet Yong Wui WuiDAP · PHPending

While visiting my constituency.

Deputy Speaker

Honourable Member for Padungan, are you taking question from Kota Sentosa?

Puan Violet Yong Wui WuiDAP · PHPending

No I only have a minute. And this is very interesting. Eh you sit down lah, you sit down. Someone asked me, “Does this person seems like, look like, sound like the Sarawak version of Jho Low”. I believe time will tell.

Deputy Speaker

The Honourable Member for Pending. Can I draw your attention to Order 32 (6), “No member shall impute improper motives where any other member make any statement or allegation which the said member is not prepared to substantiate”.

Puan Violet Yong Wui WuiDAP · PHPending

Yes. I’m not making any allegations, I said if you want further information please go and ask the State Secretary and his friend Noble.

Deputy Speaker

You are imputing improper motives.

Puan Violet Yong Wui WuiDAP · PHPending

No. No. No. They are the State Secretary because the money has to come through the State Government. So of course he has to be in the know. How can we say he doesn’t know? That’s the big problem if he doesn’t know about this project of RM31 million, then something very wrong about it. I called upon MACC to investigate this project.

From these two examples that I mentioned, I am confident, I can confidently said that the Minister in charge is not doing his job properly, efficiently and making the portfolio of integrity and ombudsman under the Chief Minister Office becomes hopeless, redundant and a waste for tax payer money. I have asked through my DUN questions on the achievement of the Ministry, the so-called achievement of the Ministry which I received through my DUN question is a list of programs organized in year 2017 and year 2018. Nothing else. Only program. Program list that is called the achievement of the ombudsman, of the integrity ombudsman in the Chief Minister Office. There wasn’t a single word mentioned of any investigation carried out on malpractices that had occurred in the State. We do not need a Ministry just to keep a senior Minister happy and receiving a RM30,000 salary a month, allowance a month excluding all the perks available like special performance payments, bonus, allowances, benefits at rates and terms decided by the State Cabinet. If this Minister cannot perform, then remove him and replace with someone who is more capable to hold the post. Tax-payers money is not to be misused and to please any individual.

Telecommunication Tower

Tuan Speaker, we understand the State Government objectives wanting to develop this Digital Economy in Sarawak so that the State can be at the forefront of the digital world. This is why the Government is working hard to improve on the digital coverage as well as the speed and that is why last year we in this august House passed the Sarawak Multimedia Authority Ordinance 2017 with the primary objective to spear head, oversees and facilitate the development and implementation of the communication, multimedia and the State’s Digital Economy initiative. One important aspect is that we should take note when it comes to formulating the policies and implementation of the relevant projects, the State Government through SMA must bear in mind that there shouldn’t be any intrusion into the rights of the people from enjoying and living in a tranquility environment. As of today, I’m still receiving complaints from the public that telecommunication towers are built too near to residential houses and that create animosity among them.

The latest complaints as for telecommunication tower is the one that’s constructed on Lot 7924, Block 11 Muara Tebas Land District, Tabuan Heights, Lorong Song 3, residential area. I was made to understand the resident stayed in the vicinity have written a letter stating their strong objection and meet with relevant authorities at MBKS on 25th October 2018. SMA is aware of what was going on but I was told there is no clear decision being made following the meeting and the residents informed that the piling works still continue. I was

shocked to learn that there was no approval from the Land and Survey Department in allowing the company name Valser (Sarawak) Sdn Bhd. This is revealed during the meeting at MBKS which belongs to a good friend of our Yang Amat Berhormat Chief Minister to construct the tower at the present site before the commencement of the project. Does it mean that because a company has a strong political connection then SMA do not dare to take any action against it but allowed them to bulldozed their way through with no regards to the residents fear and concern. I received information that few companies that have been appointed to construct telecommunication towers are somehow or rather politically connected to SO1. We have NO1 and in Sarawak we have SO1.

It is said that many times cronies company, financial interest, supersedes public’s concern, views and their rights to enjoy a peaceful living environment. A responsible Government would definitely not act in such a selfish, cruel and inconsiderate manner. On this particular project at Tabuan Heights, Lorong 3, I called upon SMA to respect the view and concern of the resident by directing the said company to stop the project immediately and build the tower at a more suitable site. The resident also would like to know why the present site which is right next to a SESCO sub-station be chosen to built a telecommunication tower?

Do you know that allowing the construction of the tower so near to residential houses, it also creates noise pollution that has severely affected the peacefulness of the area? This is due to the 24 hours annoying humming sound emitted by the equipment installed by the telco company beside the tower land. This is what happening now at SACOFA telecommunication tower at Taman Supreme Kuching. I have conveyed this problem to SACOFA, but so far nothing effective is done to eliminate the noise. I challenged the interested party including the Minister, the officer in SMA to go and camp a night there and experience it for yourself the suffering of the people and find out whether the noise is bearable. Thus it is important to plan and to pick the right site to construct the telecommunication tower. May I propose that from now on the State Planning Authority should coordinate with SMA to ensure that a suitable site with sufficient set-back be allocated for the construction of any future telecommunication tower when it comes to approve any future residential or commercial development projects, you plan it at initial stage. Don’t wait until the completion of the project of the residential project or commercial project then you come and find a small slot and squeeze your tower there. Don’t do that.

I verily believe that if my proposal can be adopted and put into practice, all these unnecessary problem or nuisance resulting from the construction of telco towers like Jalan Song and Taman Supreme can be avoided.

The present 15 meter set-back for 30 meter telecommunication tower is insufficient and should be increased further to greater distance. I thus urge SMA to review all relevant guidelines and amend the minimum setback requirements for all categories of telecommunication structures by incorporating the views and feedbacks of the local affected residents collected all these while.

Maintenance of Federal Roads in Sarawak

Tuan Speaker, I would like to call upon my neighbour, the Honourable Member for Ba’Kelalan who is also the Minister for Works to get his Ministry to monitor the work performance of DAL HCM Sdn Bhd i.e. the appointed concessionaire in maintaining Federal Roads in Sarawak. The company was appointed by the previous Barisan Nasional Government before PH took over the Federal Government.

Lately, I received so many complaints on the poor road repair condition along Jalan Tun Razak particularly the stretch turning into Jalan Dato Bandar, Kenyalang Park and also

Jalan Tun Jugah in front of 101, Kuching. In actual fact, the road maintenance works along these two roads had never been satisfactory all these years, even before this contractor was appointed.

Along these two roads, the contractor just simply patched up the roads like “koyok” plaster at the worn-up areas. I have noticed after a couple of weeks, following the repair works carried out, these patches will turn wavy again.

This pavement rutting problem has caused the road to have become uneven. As a result, driving along these sections of road had posed serious safety hazard to road users especially to the motorcyclist and of course it causes damages to the vehicles too. It is very dangerous for motorist to drive along the two roads because it could easily cause a motorcycle to skid off after bumping into the rutting pavement and end up in a accident. Any decent person will ask if the repair works were done properly and follow the standard engineering specs. How could the just repair road become rutted again within a short span of two weeks? You go and see it yourself now, the one in front of 101 Jalan Tun Jugah. Obviously, the repair works were simply not carried out properly.

May I suggest, if the contractor continue to fail in doing its job properly in accordance with the engineering standards in maintaining the Federal roads in Sarawak, then it is rightful for the Ministry of Works to review their performance and terminate the contract with them if necessary and appoint a new and reliable concessionaire through the open tender system to carry out the task.

Flash Flood

Flash flood is getting worse in Lorong Foochow 1T, 1V, 1W with no indication from the relevant authorities in tackling the issues. I have raised this matter up so many times even in my last Dewan Sitting, but the Ministry of Local Government and MBKS seems to continue turning a blinding eye on it. Many a time, I wonder what all the engineers in the Ministry and MBKS have been doing all these years? What were the reasons that caused the Government to continue sitting on the problem and choose to ignore the plights of the resident living in the area?

I wish to remind Honourable Member for Batu Kawa who is the Minister for Local Government that few years back he had in fact requested the residents staying at Lorong Foochow 1 to set up a Community Association, so that any problem faced by the local community can be forwarded to him through the Community Association. Following the Minister’s advice, a Community Association for the area was set up. I was made to understand the Community Association had actually raised this serious flash flood issue via a letter to the Honourable Minister. However, sad to say there is no solution at sight and this itself caused great disappointment to the Community Association and the residents. The flash flood is so serious that when there is heavy downpour or king tide, the road and the houses will get flooded.

This is not a new issue, but problem that has been existed for more than 40 years. It is the resident’s “long-awaited” hope to see immediate action by the Government to upgrade the drainage system in the area by turning the present mud drains into concrete drains and to raise the road level by 1 feet. Please raise the road level for short term solution. I hope that the Ministry for Local Government and MBKS will take a serious note on the request from the …. (Interruption).

Deputy Speaker

The Honourable Member for Pending, are you taking a question from Honourable Member for Batu Kitang?

Puan Violet Yong Wui WuiDAP · PHPending

No, Is there an injury time? Will you give it to me?

Deputy Speaker

I will give you

Encik Ir Lo Khere ChiongSUPP · GPSBatu Kitang

Thank you Tuan Speaker. Thank you, the Honourable Member for Pending. Ya, you talked about flooding. How can we solve this flood problem when Pakatan Harapan (PH), I mentioned yesterday, our Honourable Member for Santubong has verified RM250 million worth of flood mitigation projects have been taken away from Sarawak? How do you want us to solve our flood problem?

Another one since I am here. I want to ask this question. I want to clarify because I don’t understand. I mean I support you when you talk about corruption. Whether it is from the west or from the east, a fountain, and all the other corruption cases that you mentioned, but one thing I don’t understand Honourable Member for Pending, you are a Lawyer, have you ever taught about writing to MACC and put this in black and white and let the MACC do their job. MACC is now a Federal authority. If you have, please show us your letter. If you have not, please explain why you haven’t done it?

Thank you.

Puan Violet Yong Wui WuiDAP · PHPending

Tuan Speaker, I’m sad to say that this Honourable Member for Batu Kitang did not listen properly to my speech. The flash flood issue was 40 years. It happened since 40 years ago. So, what has the Council MBKS been doing for the past 40 years? It’s not just happening yesterday or since PH took over. So your answer on that RM250 million cancelled, that is all irrelevant. But one thing for sure is, the Council, the Ministry of Local Government are not doing their job. They are sleeping in the office.

The second thing on whether I have written a letter to MACC, I believe that is not the core issue here. One thing we have to bear in mind, we are running a Government. We are the State Government of the day. To ensure good governance, accountability, that is the core practice that we must put into in running the State.

We should not allow all these abuses to take place as the first place. So, are you saying that you allowed the State Government, you condone to the Sarawak State Government in practicing all these mal practices and you leave it to us from the DAP and ask us to go report to MACC.

Deputy Speaker

Pending. Pending, I would like to repeat, Order 32 (6) you shall not make or impute any improper motives or make allegation which is not such and dated. So you cannot say that the State Government is corrupted.

Puan Violet Yong Wui WuiDAP · PHPending

No, I am saying our Sarawak Government should have, should practice good governance.

Deputy Speaker

Ya, it is okay you say good governance.

Puan Violet Yong Wui WuiDAP · PHPending

Ya, transparency and accountability. I am not making any allegation.

Deputy Speaker

You cannot make allegation that the State Government is involve in corruption.

Puan Violet Yong Wui WuiDAP · PHPending

No.

Deputy Speaker

Okay, can you proceed with the next point please?

Puan Violet Yong Wui WuiDAP · PHPending

Ya, I am answering because you said you give injury time for me to answer to him.

Deputy Speaker

Ya, I am giving you three minutes. Can you proceed? You just got two more minutes.

Puan Violet Yong Wui WuiDAP · PHPending

Okay. So, I will call upon the Malaysian Anti-Corruption Commission (MACC) to investigate. If you want, if MACC is lousy that I have to wait for my letter, I think MACC is also have to close shop lah, but I don’t think our Federal Government (interruption...) The Chief! The Chief! The Chief from Sarawak have to be changed. This one, ada sikit masalah sana.

So, I hope that, I remind all those in power, in the State power, please be clean. Jangan main-main ah.

Okay, for on my last issue, Timbalan Speaker, it is time for the Sarawak State Government to grow up and be more mature politically. A good Government is supposed to treat her citizens equally despite their differences in political affiliation, background, races, culture and religion.

Sadly, looking at Sarawak Gabungan Parti Sarawak (GPS) or Barisan National (BN), politics is all about oppressing, suppressing take revenge against those who they felt are not with them.

This is a clear sign of inferior complex. Sarawak GPS or BN does not give any option to the people but force the people to be subservient to them or else, GPS will apply the scare tactics to ensure they got their ways. I noticed that after BN lost the Federal power on May 9, GPS has since gone amok. Gila-gila (laughter..) “Amok” mean gila-gila okay.

Circular Prohibiting Communities Leaders from Attending PH Functions

Recently, I read with disbelief of a circular issued by the Sarawak State Secretary stopping all community leaders and village headmen from attending programs organized by PH Government. This is the most ridiculous directive I have ever read. Any sensible government will do its utmost best to unite the people but this GPS government acted the opposite way.

May I urge the Sarawak GPS to stop all this nonsense. Stop all this nonsense. For the betterment of all, the Sarawak GPS Government and the PH Government should work hand in hand with one heart to unite the people and ensure Sarawakians get the best out from all the policies implemented through the State or Federal level.

Community leaders act as a ‘bridge’ between the people and the Government. By not allowing the community leaders to attend PH functions, the GPS Government is obviously burning its own bridges. GPS might think that this is a smart move, but in reality, this dirty trick is seen as self-destruction.

Deputy Speaker

Pending, you got one minute to conclude.

Puan Violet Yong Wui WuiDAP · PHPending

Ya, I am concluding.

Deputy Speaker

I have given you injury time.

Puan Violet Yong Wui WuiDAP · PHPending

I am proud to say PH Government does not subscribe to such ‘below the belt’ tactic because we believe the community leaders have every right to

attend any function hosted by PH or GPS. We value the importance of the Community Leaders as their main role is to ensure that all information or policies from the government are disseminated correctly and efficiently to the people on the ground so that they get the benefits out from it.

In order to let Sarawak progress to greater heights, GPS Sarawak should do away with such childish undiplomatic ways. I urge YAB CM to have a ‘bigger heart’ in ruling Sarawak. The circular itself in actual fact has made Sarawak GPS a laughing stock.

Last paragraph, if YAB CM wishes to leave a legacy behind like our late Tok Nan, then, act with more class. Even our Prime Minister, Tun Mahathir has asked the police not to arrest those who criticized him through the social media. He said as a leader, one must be prepared to be criticized. Therefore, please cancel the circular letter that prohibits the local community leaders to attend PH function with immediate effect and not to treat these community leaders as Sarawak GPS propaganda tools. Do not claim that because State Government pays their salary, GPS can just simply control them like robots. Bear in mind, the allowance paid to these local community leaders are from the taxpayers’ money and not your grandfather’s money.

And with that, I conclude.

Deputy SpeakerEN

Ahli Yang Berhormat for Kedup.

Encik Martin BenPBB · GPSKedup

Terima Kasih, Tuan Speaker kerana memberi peluang kepada saya untuk turut serta dalam perbahasan Bajet Negeri Sarawak 2019 dan seterusnya menyokong Belanjawan 2019 seperti yang dibentang oleh YAB Ketua Menteri selaku Menteri Kewangan pada 5 November 2018.

Tuan Speaker, sebelum saya meneruskan perbahasan, saya ingin mengucapkan Tahniah dan Syabas kepada YAB Ketua Menteri di atas penganugerahan Ijazah Doktor Kehormat Ekonomi Pembangunan oleh UNIMAS sempena Konvokesyen UNIMAS yang Ke-22 pada 29 Oktober 2018.

Tuan Speaker, The Sarawak State Budget 2019, presented by the Honourable Chief Minister to this august House is a People-Centric Budget with a comprehensive programme that provides a well-defined balance between rural development and the push for digital economy in modernisation. It also sets the direction and tempo for development in the years to come and creates an enabling environment for the people in Sarawak to adjust to the demands of the changing times. Just like previous State Budget, it continues to be a development-biased and rural-focused Budget, where 76% or about RM9 billion will be allocated for development. And of that, 67% or RM6.049 billion will be for the development of rural areas. Thank you, YAB Ketua Menteri. With the six keys strategies put in place, I am confident that Sarawak 2019 Budget will generate higher economic growth and enable the State to achieve balance in its economic development.

Pembangunan di Kawasan DUN N.22 Kedup

Tuan Speaker, pertamanya, bagi pihak rakyat di Kawasan DUN Kedup, saya ingin mengambil kesempatan ini untuk merakamkan penghargaan dan terima kasih kepada kerajaan kerana telah melaksanakan banyak projek pembangunan dalam Kawasan DUN Kedup. Jelas bahawa pelaksanaan projek-projek ini telah memberi manfaat kepada masyarakat setempat:

(a) Lebih 200 buah projek fizikal kecil dan sederhana telah dilaksanakan melalui Program RTP, Program MRP dan Dana MARRIS dalam beberapa tahun yang sudah;

(b) Selain itu, banyak juga bantuan telah disalurkan melalui agensi-agensi Kerajaan seperti bantuan pertanian, ternakan, kebajikan dan lain-lain; dan

(c) Penambahan kemudahan dan perkhidmatan di Klinik Kesihatan Bunan seperti berikut:

i. Tambahan jumlah pegawai kesihatan; ii. Unit farmasi; iii. Perkhidmatan ambulan yang diwujudkan semula; iv. Unit pergigian bergerak; dan v. Lab

Walau bagaimanapun, Tuan Speaker, masih terdapat banyak lagi keperluan-keperluan atau kemudahan-kemudahan yang masih perlu kita laksanakan. Antaranya adalah seperti berikut:

(a) Menaik taraf jalan pertanian ke jalan penghubung desa di kawasan Kampung Sg. Aping yang merangkumi Kampung Sg. Paoh, Kampung Sg. Buru, Kampung Kranji Baroh, Kampung Kranji Atas, Kampung Sg. Linsat, Kampung Kenyalang, Kampung Sg. Aping dan Kampung Empassa yang menuju ke SK Triang yang baru saja dibuka pada tahun 2018 sepanjang tiga kilometer;

(b) Membina jalan alternatif dan menaik taraf jalan dari Kampung Paoh Gahat ke SK Triang dan seterusnya ke Kampung Tong Nibong yang masing-masingnya sepanjang dua dan enam kilometer;

(c) Penyambungan bekalan air paip terawat ke Kampung Krangan Baru, Kampung Krangan Terusan, Kampung Krangan Engkatak, Kampung Krangan Jaya dan Kampung Krangan Tekalong;

(d) Penyambungan bekalan air paip terawat ke sebahagian kawasan di Kampung Sg. Engkabang; dan

(e) Bekalan elektrik ke lebih 300 permohonan baharu atau tambahan dari kampung-kampung dalam Kawasan DUN Kedup.

Proposed Growth Centre at Muara Mongkos/Bunan

Tuan Speaker, allow me to dwell further on my constituency Kedup and focus on Muara Mongkos/Bunan area, a Bidayuh settlement which is located near the border with Kalimantan, Indonesia. Historically, Muara Mongkos has been a trading centre where traders from both sides of the border converge to conduct their business involving the sales of a wide range of local products. The area has grown to become a centre of economic and social activities, thanks to the cross-border trade that has grown over the years. To cater to the needs of the growing local population, Muara Mongkos has been provided with the following facilities and amenities, namely:

(a) SALCRA Estate Village;

(b) A Police Post;

(c) General Operations outpost;

(d) Custom and Immigration Post;

(e) Health Clinic or Klinik Kesihatan; and

(f) Three Primary schools; and a host of other social amenities such as Resource Centre, Parish Centre and a few sporting facilities.

In light of the changing, taking shape in the area and nearby hinterland and the socio-economic prospect for the future holds for the local population, I would like to propose for the setting up of a Growth Centre between Muara Mongkos and Kampung Bunan which will contribute to consolidating the socio-economic development and growth of the area. The proposed Growth Centre would cover 25 villages within 7 to 10 kilometres in the area and the combined population close to 10,000 provides the much-needed critical mass to support the growth. With a proper Growth Centre set up, opportunities will abound for the development of rural entrepreneurship. These include opportunities for trading, skill training for local youths, development of local handicraft industry and local tourism. The area now has approximately 4000 hectares of oil palm estates and more than 1000 hectares of small holder lots and the plantation business will be a core activity to drive the economy of the proposed Growth Centre. Other prospective activities are repairs and maintenance services and other support services to cater to the needs of the plantation and agriculture sector. Also, with the setting up of the Growth Centre in Muara Mongkos/Bunan area, the perennial problem of rural-urban migration will be effectively mitigated at the source. But above all, the Growth Centre will open up Muara Mongkos/Bunan and the nearby villages to a new vista of opportunities and the long-term plan for further sustainable development. I sincerely hope the relevant agencies will take heed of this proposal as much as I look forward to seeing it coming into fruition soon.

Conclusion

In conclusion Tuan Speaker, untuk mengakhiri ucapan, saya ingin mengambil kesempatan ini untuk mengucapkan, Selamat Menyambut Maulidur Rasul kepada masyarakat Islam, Selamat Hari Krismas kepada umat Kristian dan Selamat Menyambut Tahun Baru 2019 kepada semua. Semoga Tahun Baharu 2019 akan membawa kesejahteraan dan kemakmuran kepada kita semua di negeri Bumi Kenyalang yang bertuah ini.

Maka dengan ini, saya menyokong penuh Rang Undang-undang Perbekalan 2019, (2018) dan usul untuk merujuk Resolusi Anggaran Pembangunan Tahun 2019.

Terima kasih.

Deputy SpeakerEN

Ahli Yang Berhormat for Tamin.

Thank you, Tuan Speaker, for giving me the opportunity to debate for this budget. First I would like to congratulate Yang Amat Berhormat Ketua Menteri Sarawak for tabling Supply Bill on State Budget 2019 on 5th November 2018. The history is created for the first ever biggest budget of total amount of RM11.914 billion. And to note that also, this budget is a surplus budget. For year 2019 budget, RM9.073 billion or 76% is proposed for development expenditure while an amount of RM2.841 billion or 24% is for operating expenditure.

I would like to thank Yang Amat Berhormat Chief Minister for his commitment and effort in bringing development to rural areas which is opening greater opportunities in rural

and more remote areas for the economic prosperity of rural community. To accelerate development in rural areas, Yang Amat Berhormat Chief Minister allocated an amount of RM6.049 billion or 67% of the total development budget in 2019 for development in rural areas.

Tuan Speaker, prior to May 2018, previous Barisan Nasional Government approved many projects in the State to complement the need of our community. However, after Pakatan Harapan took over Putrajaya, many of these projects have been scraped or cancelled. And worst was when the budget allocation for Sarawak only for RM4.346 billion as announced in the 2019 Federal Budget, which is only 7.94% of the total development fund and is lower compared to 2018 development budget. The State Government has contributed significantly to the national economic growth in term of collection of tax and revenue from oil and gas. It is only fair that the Federal Government provide more allocation to the State of Sarawak particularly for development purposes.

Tuan Speaker, by looking at the current scenario, we cannot put too much hope in term of financial assistance from the Federal Government to fund the development projects in Sarawak. For that GPS Government under the leadership of Yang Amat Berhormat Ketua Menteri, has proposed key strategies aimed to generate higher economic growth as well as achieving a more balanced economic development in the State. Among the key strategies are development-biased and rural-focussed budget, state development agenda, digital economy, investment driven economic growth, involvement of private sectors and effectiveness of service delivery system. By introducing new sales tax on petroleum products is a very wise decision as a new revenue to the State with income to be expected to an amount of RM3.897 billion in year 2019.

Tuan Speaker, let me remind the Honourable Members in this august House, GPS and Pakatan Harapan are both born less than six months. GPS ditched BN right after the 14th General Election and Pakatan Harapan formed a Government after the concluded victory in GE14 in May 2018. Now, Pakatan Harapan is raising an argument what Barisan Nasional had done in the last 55 years. Whether Pakatan Harapan supporters realised or not, the Prime Minister, Tun Dr. Mahathir Mohamad and some of the current cabinet ministers were part of the 55 year-government before Pakatan Harapan became present Government. There is no point in repeating to blame the previous Government as you are insulting your own current political masters who were part of that Government before this. I urge Honourable Members from Pakatan Harapan to stop blaming the previous Government and rather to fulfil your promises or hot air of which one them is, to bring 30% of development fund back to the State or to match with the State Budget of RM11.914 billion. Let’s put our hands together for the development of our State of Sarawak as Ibu Pertiwiku.

Tuan Speaker, I fully support well-being Yang Amat Chief Minister allocated fund for each new born Sarawakian an amount of RM1000.00 effectively on 1st January 2019 as savings which only allows to be withdrawn when they reach 18 years old for higher education purposes.

Tuan Speaker, may I propose that additional fund also to be provided for Sarawakians pursuing to the tertiary education as part to assist on the admission and tuition fee on one-off basis.

Tuan Speaker, now I would like to bring up in details on development in DUN Tamin. Walkabout Project

Tuan Speaker, I would like to thank Yang Amat Berhormat Chief Minister for his visit to Pekan Selangau on 5th May 2018 whereby he has approved few projects and now in various stages from design and up to tender stage for the followings:

(a) Mini Sport Complex Selangau with a cost of RM8 million; (b) Selangau Waterfront with a cost of RM5 million; (c) Upgrading of Jalan Pasai-Siong Hilir with a cost of RM17 million; (d) Upgrading of Pejabat Daerah Selangau with a cost of RM5 million; (e) Upgrading of Jalan Sg Bawang-Kemena with a cost of RM2 million; (f) Construction of multi-purpose hall to SK Tong Ah, Selangau with a cost of RM500,000.00; and (g) All these projects are expected to be completed by year end 2020.

Infrastructure - Road

I appeal to the Government to upgrade abandoned logging roads or bekas jalan balak in DUN Tamin. These roads are one of the main access roads to connect small towns within that area. The proposed roads are as follow:

(a) Naik taraf bekas jalan balak Sg Sapudun / Tg Taroh Balingian, Sibu; (b) Naik taraf bekas jalan balak Rh Pengarah to Rh Emong Ulu Mukah, Sibu; (c) Naik taraf bekas jalan balak SK Pakoh to Ng Bunau Ulu Oya, Selangau; (d) Naik taraf bekas jalan balak Ng Selangau to Rh Kundang Ulu Selangau; and (e) Naik taraf bekas jalan balak Rh Ganya to Rh Amping Ulu Oya.

I wish that the Government will allocate funds for the upgrading of the existing roads to the gravel roads.

Water Supply

Tuan Speaker, I am giving full support to the initiative by Yang Amat Berhormat Ketua Menteri to allocate budget of RM2.8 billion to construct water grid aimed to supply treated water to each area in Sarawak and expected to be completed by year 2020.

For DUN Tamin, many longhouses are still not getting supply of treated water and at the moment depending on the rain water and gravity feed water for their daily use. The area are as follows:

(a) Pekan Selangau to Pekan Arip; (b) Jalan Ng Tajam / Ng Dijih Tamin; (c) Jalan Ng Sekuau; (d) Jalan Stapang to Ng Kua; (e) Jalan Ulu Selangau; (f) Jalan Sapudun / Tg Taroh; (g) Jalan Ulu Balingian; (h) Jalan Pelugau; and (i) Jalan Bawang Kemena.

I wish to see that the above areas benefit on the supply of treated water by 2020 in line with Yang Amat Berhormat Chief Minister to provide the basic amenities to the rural community.

Meanwhile, for those longhouses that are not able to get water supply from the mainline, I hereby propose to the Government to provide alternative program introduced by Government namely SAWAS. This scheme should be extended to longhouses in areas of Ulu Oya, Ulu Pakoh, Ulu Mukah, Ulu Selangau and Ulu Balingian.

Electricity Supply

I am also giving full support to the initiative by Yang Amat Berhormat Chief Minister to allocate budget of RM2.6 billion to supply the electricity to each area in Sarawak which also expected to be completed by 2020. As for DUN Tamin many longhouses still depend on genset for electricity supply.

These areas are as follows:

(a) Longhouses along Jalan Dijih; (b) Longhouses along Jalan Sg Sapudun-Tg Taroh; (c) Longhouses along Jalan Pakoh Ng Stutong, Ulu Bunau; (d) Longhouses along Jalan Bukit Tanggie; (e) Rh Agnes, Rh Dindang and Rh Manjah Batu 20 Jalan Oya; (f) Rh Akok Jalan Ng Tajam; (g) Rh Jimin and Rh Linggi Sg Bukut; (h) Rh Rosni, Nanga Nirai; and (i) Rh Tukau Ng Sebatu.

Therefore, I appeal to the State Government to allocate budget as these projects are critical and should be given top priority for implementation and I wish to see these areas to be supplied with electricity by year 2020.

And for the longhouses that is unable to receive electricity supply from the power grid line, I suggest alternative supply to these longhouses under the program introduced by the Government namely SARES or Solar System.

Education

I thank to the State Government for the allocation fund in Budget 2019, an amount of RM81.7 million to repair dilapidated schools in Sarawak despite that education is under the purview of the Federal Government. Hereby, I wish that this budget will benefit the schools in Tamin and to be provided with good facilities such as electricity supply from the grid line to replace the electricity supply from the gen-set, supply with treated water supply, internet access and so on.

I also wish to follow up on the progress of proposed SMK Selangau which was approved by previous Federal Government for an amount of RM88 million.

Agriculture Sector

Tuan Speaker, as we noticed commodity prices such as palm oil, rubber and pepper keep on dropping day by day. This will significantly a bad impact to the rural community because this is their main source of income and many has put lots of time and money as they venture in these economic activities.

I have urged rural folks in DUN Tamin with population more that 40,000 to diversify their economic activities to agriculture planting of vegetables and fruits and pig farming as alternative source of income.

Therefore, I appeal to Government to provide financial assistance and guidance to those interested. For this, I would like to request to have one collection centre in Selangau to buy and market these products.

Proposed Selangau District Council

Tuan Speaker, now, I want to talk on Proposed Selangau District Council. This proposal to set up Selangau District Counsil raised in my debate during last Dewan Undangan Negeri sitting but I have yet to receive any reply from Minister in charge.

Tuan Speaker, let me touch briefly on Sibu Rural District Council (SRDC) or Majlis Daerah Luar Bandar Sibu. SRDC is local authority which administers Sibu rural area covering total area 6,000 kilometres square inclusive of Sibu Jaya, Selangau District, Durin and Bawang Assan. The establishment of this council is to provide basic amenities, public infrastructure and professional services to population under its jurisdiction.

I am glad to see that development in Sibu Jaya is growing fast under jurisdiction of SRDC. Nevertheless, because of commitment to develop covering such big area, some areas within its jurisdiction received less focus on development fund.

Therefore, Tuan Speaker, I proposed that area under jurisdiction of SRDC to scale down to give more effective and overall services. For that, I would like to proposed new district council to be established namely Selangau District Council, SDC or Majlis Daerah Selangau. SDC would cover area from Siong, Sekuau, Batang Oya, Selangau and up to Arip. By form of SDC, I am confident more development to these areas and would uphold better standard of living. I appeal that the Government to consider set up new district council for better administrative to benefit our local people.

For conclusion Tuan Speaker, it is my aims to see more funds for development approve in Dewan Undangan Negeri Tamin as this will narrow the development gap between rural and urban are. For that, I wish to inform this august House, I am giving my full support for State Budget 2019 which was presented by Yang Amat Berhormat Ketua Menteri Sarawak on 5th November 2018. Before I end my speech, I would like wish Merry Christmas to all Christians and Happy New Year to everyone.

Sekian, terima kasih.

Deputy Speaker

Honourable Member for Dudong.

Datuk Tiong Thai KingBEBAS · BNDudong

Thank you Tuan Speaker for allowing me to participate in the debate on the State Budget 2019 presented by the Right Honourable Chief Minister of Sarawak in this august House on the 5th November 2018.

I would like to congratulate the Right Honourable Chief Minister of Sarawak, Yang Amat Berhormat Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg for presenting the largest budget in State history with a record of RM11.914 billion.

Tuan Speaker, the cities and the rural areas through the development of basic infrastructure in the rural areas so that the people can improve their socio-economy and other kinds of development including digital economy. We will continue to give full support to Yang Amat Berhormat Ketua Menteri Sarawak and work hand in hand to ensure a developed and prosperous State of Sarawak.

Tuan Speaker, I wish to highlight the following issues for the State Government to seriously consider and realize for the development of the State and the well-beings of its people particularly in Sibu.

Sungai Bidut Industrial Development Park

In view of the developing industries in Kuching, Miri and Bintulu and in line with the state industrialisation programme, Sibu as the gateway to Central Sarawak and with a population of nearly 300,000, is in dire need of industrial development park in the quest to boost the thriving business community.

Sungai Bidut is just located across Sibu town, separated only by the Igan and Rejang River. There are few ferry points from the town (Tua Pek Kong Wharf, Town Square Phase 2 Wharf) to Sungai Bidut. Another way to get there is by driving more than 10 kilometers via Igan Bridge. It only takes 20 minutes to reach Sibu town. Besides, the proposed industrial development park at Sungai Bidut is strategically located along the Sibu-Tanjung Manis Road. It takes about 1 hour only to reach Tanjung Manis Port.

The setting up of this proposed industrial park will lead to injection of new investment capital and expansion of new business and industrial activities to provide job opportunities as well as facilities for small and medium enterprises (SMEs). But from the reply to the oral question regarding industrial development park given by the Assistant Minister of E-Commerce, Assistant Minister of Entrepreneur and Small, Medium Enterprise (SMEs) Development, it is saddening to note that such industrial park was under Federal project. To date, there is no indication whether the project is delayed, shelved or suspended. As such I would like to appeal Yang Amat Berhormat Chief Minister to give serious consideration for our State Government to take over the project and implement the proposed industrial park.

This proposed industrial development park is crucial to the development of central region of Sibu. It will help to spur activities that will turn contribute to socio-economic developments of Sibu. With this, Sibu should witness an accelerated pace of business expansion. It is our hope that the State Government would continue to facilitate the growth of local business community, especially SMEs which are the backbone of the nation’s economy.

MA63

Tuan Speaker, regarding MA63 issue, I fully support the Ministerial Motion to form a Consultative Committee comprising of members from all political parties represented in this august House to establish, determine and agree upon the representations for submission to the Sarawak representatives of the MA63 Steering Committee to advance and safeguard the special interests, rights and position of Sarawak as enshrined in MA63 and the Federal Constitution and to meet the expectations of Sarawakians for greater autonomy and devolution of powers to the State.

Tuan Speaker, indeed it is fitting and timely to revisit MA63 and to access the breaches of MA63 by the Federal Government. I am sure that our Sarawakian are very happy with the passing of this motion as this will represent the voices of Sarawakian to the Federal Government on all issues in the MA63 negotiations which concerns our state and the entire population of Sarawak.

This will give assurance to our people that the State Government under the capable leadership of our Chief Minister is people-centric and will always have the people at the heart in major decisions. This is of paramount importance for the current and future generations. On top of this, Sarawak wants to get full autonomy on subject matters involving education and health. Let Sarawak decide on her own education and health policies.

On this note, I also fully support Yang Amat Berhormat our Chief Minister and Yang Berhormat Minister of Education, Science and Technological Research for various

programmes to improve the standard of English in Sarawak and our State Government to ‘intervene’ to improve the standard of English among students in the state. At the same time Bahasa Malaysia remains as a national language.

No doubt English is an international language. Mastering the English language cannot be avoided in view of globalization and the Industrial Revolution 4.0. Our market now is global and our digital economy now is also integrated with the world. We must be able to connect the world with the international language. We must possess the capacity to make our Sarawakian global in mindset and competence.

Incentive for New Born Baby 2019

Tuan Speaker, our State Government decision to introduce the new policy to give a one-off incentive of RM1,000.00 to every Sarawakian new born baby form 2019 onwards irrespective of ethnicity, religious belief and social status is indeed commendable. I fully support our new policy as this will certainly benefit the people of Sarawak especially the new generation in Sarawak.

The incentive can only be withdrawn upon attaining the age of 18 and is meant for their further education or as capital to pursue their career. However, I would like to know how is this incentive to be generated to increase its value during this period of 18 years and what is the estimated value after 18 years? Will our State Government also consider any incentive to reward the mothers as well?

Allocation to Chinese Independent High Schools

The Chinese community are so grateful that since 2014, the State Government has allocated financial assistance every year to Chinese Independent High Schools.

Education is important for our development. Chinese schools have played a significant role over the years to educate both Chinese and non-Chinese students. They have provided human capital for the progress of our nation and made significant contributions towards nation-building.

To become a high-income State, Sarawak must develop a strong foundation in education, which remains the key to achieving progress and development. The Unified Examination Certificate (UEC) is a standardized test for Chinese Independent High School students. It is recognized as a qualification for entrance into many tertiary educational institutions around the world.

From the Federal Budget 2019, there is an allocation of RM12 millions to the Chinese Independent Hight Schools next year. But the allocation of RM12 millions are to be shared by all the 61 Chinese Independent High Schools throughout the nation.

Datuk Tiong Thai KingBEBAS · BNDudong

So the share of the Federal allocation for Chinese Independent High Schools is very limited. The schools are trying very hard to be self-sufficient but they face a deficit every year. They are kept alive almost exclusively by donations from the public. Referring to the Sarawak Budget 2019, with the new revenue stream from the petroleum sales tax, Sarawak was projected to generate a record high revenue exceeding RM10 billion next year while the proposed 2019 budget would generate a surplus of RM122 millions. As such, Tuan Speaker, with the increase State revenue this year, I would like to appeal to our State government to increase the allocation for Chinese Independent High Schools to RM12 million from next year onward as pledged by former Chief Minister.

Tuan Speaker, with the above, I wish to render my full support to the State Budget tabled by the Right Honourable Chief Minister of Sarawak in this august House on 5th November 2018.

Sekian, terima kasih.

Deputy SpeakerEN

Ahli Yang Berhormat for Piasau.

Thank you very much Tuan Speaker, for giving me this opportunity to join the other Honorable Members to debate on the Supply Bill (2019), 2018. I would like to congratulate Chief Minister Yang Amat Berhormat Datuk Patinggi (Dr) Abang Zohari for being conferred an “Honorary Doctorate in Economic Development” by UNIMAS on the 29th October 2018.

State Budget 2019

Tuan Speaker, I also would like to congratulate Yang Amat Berhormat Chief Minister for tabling record high revenue of more than RM10 billion, high impact, far-sighted and people- centric Supply Bill for 2019, thereby strengthening and accelerating our economic base for a strong and prosperous future for Sarawak, achieving high income state by the year 2030. It is indeed an extraordinary budget of development with strong emphasis on rural development in order to close the development and economic gap between the rural and urban areas. The rural areas are still lacking in basic necessities such as water, electricity, schools, health care and roads. Whereby 76% of total budget assigned for development expenditure while 67% of it goes to the development of rural areas. It shows the seriousness and commitment of our GPS government to accelerate to close this gaps.

Tuan Speaker, it is important I said it yesterday, two days ago and I would like to say it here again, I am a Sarawakian and proud to be Sarawakian and I believe all I said the Honourable Members are also proud Sarawakians. Therefore, I will continue to speak for Sarawak and fight for the right of Sarawakian.

Tuan Speaker, the Federal Budget 2019 allocated RM4.3billion development expenditure to Sarawak representing only 7.86% out of total RM54.7 billion. Sabah get RM5 billion and Malaya gets the remaining RM45.4 billion. For us here Sarawak only 7.86% not 30% as announced by PH Sarawak. And we are asking, we are saying, we are equal partners in that situation we should be getting at least 30%, if not 30%, 20% would do for now.

Tuan Speaker, at the last DUN sitting in July 2018, I spoke and requested our Government to consider an allocation of RM 2,000 to every Sarawakian family of a newborn child, as one off payment. Today, I am very thankful and wish to record sincere appreciation to Yang Amat Berhormat Chief Minister for giving one-off incentive of RM 1,000 to all newborn babies beginning of next year 2019. This incentive can only be withdrawn upon attaining the age of 18, with the objective to help in furthering their education or use as starting up capital to pursue their career. This is for long term planning for the newborn babies, which is good.

But for the parents, especially, the poor and needy family, blessed with a new born baby, need immediate relief and help, and cannot wait for 18 years. 18 years is for the baby, good but for the family instant financial help of RM 1,000.00 will bring great relief and tremendous happiness. They will be very delighted and thankful to our government for thinking of them and sharing their happy moments of a newborn baby of RM 1,000.00 gift.

Tuan Speaker, with this RM 1,000.00, the total commitment and allocation of the Government will only be RM 2,000.00 to the family of the newborn child. With this scheme, our Government takes care of both the baby in the long term and the family immediately. Perfect and so wonderful, isn't it?

Tuan Speaker, that was for the joy and happiness of a newborn baby. Now what about the sad and shocking news of the passing of a loved one of a member of the family? Should we also have they in mind and share their sadness by showing our care and concern? In this hour of sadness, despair and in need of prayer, comforting words and financial assistance, our thoughts, sympathies and prayers should be with the members of the family at this time and indeed, a caring Government should or must immediately move in to give a helping hand. A personal touch is important here.

Again last DUN sitting in July 2018, I suggested that a sum of RM 2,000 be considered and be given to the bereaved family on the death of a member of the family by our Government. Sadly, this budget 2019 did not include this. Therefore, I would like to appeal to our Yang Amat Berhormat Chief Minister to consider favorably and allocate a sum of RM 2,000 to the family for this. There are approximately 12,000 deaths in a year in Sarawak and the total commitment by our Government will only be RM 24 million. This RM 24 million a year will go a long way for our Chief Minister and our government as a whole.

Tuan Speaker, when the State Budget 2019 was published yesterday, the people in Miri commented in the press that,

i. There was no development fund being allocated for Miri; and ii. There was also no provision to build affordable houses in Miri.

I had mentioned many times already in this august House that Miri people are asking for affordable and low cost houses. Miri people and myself are disappointed that affordable housing for Miri was not included in this budget. Affordable housing was in my manifesto in PRN 2016 election and the late Tok Nan campaigned for me and urged people to vote for me. He knew my manifesto. Housing is so important to everyone. And people voted partly because of my manifesto and I hold this manifesto very dearly and would not want to give excuses for not fighting for these items listed in my manifesto, unlike others who would give excuses and continue to give excuses, at times with conflicting statements. Blaming others seems to be the norm for them.

Tuan Speaker, I would like to thank our Assistant Minister Yang Berhormat Dr. Haji Annuar Rapaee yesterday morning in answering my question and supplementary questions on the affordable houses in Miri Permy 3 launched by the then Yang Amat Berhormat Chief Minister on April 2013. I take comfort to read the announcement by Honorable Member of Parliament for P219 Miri, Yang Berhormat Dr Michael Teo as reported on the 13th August 2018 that Federal Government would build 8,000 units of affordable houses in Miri or he says he would try to arrange 8,000 units affordable houses in Miri. Nevertheless, I will appeal to our Chief Minister to allocate substantial sum to build affordable houses in Miri under his walkabout next year.

Tuan Speaker, we have to face hard political reality that the Federal Government would be very slow and at times reluctant to help develop Sarawak and allocate adequate development funds, notwithstanding the assurances given by the Honourable Member of Ba’Kelalan who is also the Federal Minister of Works yesterday. Therefore, it is prudent for our Sarawak Government to look for new source of revenue income. I fully support the move and decision by Yang Amat Berhormat Chief Minister in exercising Sarawak’s rights to impose State Sales Tax of 5% on petroleum products as the new source of revenue for Sarawak as well as projecting the State towards the direction of being financially

independent and part of Sarawak’s move to enforce financial autonomy. It is estimated that it will generate extra RM3.897 billion reserve next year.

Tuan Speaker, strict and vigorous collection of the new source of revenue from petroleum products is vital and make sure there are no leakages. At the same time, maybe it is necessary to establish a mechanism to fix the prices of those petroleum products. With this sales tax in place, it is anticipated more revenues will be forthcoming in 2019 and beyond. This is certainly good news and I would like to suggest the followings:-

(a) PETROS should be given adequate of sufficient fund to play more active role in the oil and gas industry including prospecting, exploration and production;

(b) In furtherance of (a) above, PETROS should be encouraged to engage and enter join venture with established oil companies because Sarawak should no longer be just a bystander; and

(c) Sarawak Government should also seriously consider investing and purchasing equity in some of the present gas fields owned by PETRONAS and or other oil companies.

Tuan Speaker, we are confident that PETROS is in good hand and will do well like any other oil companies.It will be extremely wonderful if Sarawak Government would also declare payment of yearly dividend to each and every Sarawakian when PETROS starts making profit. This will reaffirm to the people in Sarawak that indeed oil and gas resources belong to them the Sarawakians.

Tuan Speaker, as Sarawak develops and prospers, especially the city centres, the public transportation will become a necessity infrastructure to solve the issue of having too much cars on the road and thereby creating traffic jam. Sarawak Government should plan ahead to provide free and efficient public transportation for the people in Miri, Kuching, Sibu and Bintulu. With the additional revenue from the State Sales Tax and anticipated profits from PETROS, there will be surplus and sufficient money to be put aside in setting up a sovereign fund which I mentioned last DUN sitting like Norway did with their sovereign fund, which has now surpassed the US 1 trillion dollars in assets in 2017, in the matter of 28 years. Just for information again, Norway received US131 billion dollars as dividend for 2017, which translate into RM543 billion dividend. The fundamental condition of our sovereign fund of course is to be professionally managed to ensure that the future generation will benefit from the oil and gas revenues even after the depletion of our natural resources. This should be a good start.

Tuan Speaker, with the trade war heating between China and United States, it is a golden opportunity for Sarawak Government to encourage more foreign investments to Sarawak with special business and economic incentive. On the other hand, we should also be aware of an international agreement called Comprehensive and Progressive Agreement for the Trans-Pacific Partnership (CPTPP), a trade agreement signed by 11 Pacific Rim nations such as Malaysia, Japan and Canada. Originally was known as Trans-Pacific Partnership Agreement (TPPA) until United States decided to pull out from the agreement. According to Annex IV of the Agreement, it recognises that PDA 74 vested PETRONAS with the entire ownership and the exclusive rights of petroleum hydrocarbon resources, whether onshore or offshore of Malaysia.

In addition, the agreement recognises Petronas as the sole entity that may award petroleum arrangements and other related contracts for exploration, development and production activities in Malaysia to other companies.

Tuan Speaker, I would like to urge our Government to immediately look into this matter and send representation to the Federal Government informing that we were never consulted and shall not agree to such agreement and it is eroding our oil and gas rights.

Education Autonomy

Tuan Speaker, the recent Khazanah Research Institute report is saying that three years out of 12 years of schooling in Malaysia are totally wasted due to low quality of education. In year 2015, our students scored below average for all three categories: Science, Reading, Mathematics, among the 72 countries that participated the Programme for International Students Assessment (PISA) even scored lower than Vietnam.

Before the GE14, for many years the PH Sarawak YB’s claimed that their was a big problem with the education system but now after becoming the Federal Government, the new Federal Education Minister came out and say that they would continue with the current education blueprint. This is indeed disappointing. We all remember our late Tok Nan and his ‘54 Principles and Actions’ in which the Government recognized the use of English as a medium instruction in the school for Sarawak. He also said that Sarawak will be the official second language for Sarawak Government. In 2016, our Honourable Member for Kota Sentosa demanded our late Tok Nan to implement the usage of English as a medium instruction in our schools. However, the new Federal Education Minister in his reply in Parliament to a question raised said that it was unconstitutional for Sarawak to use English as medium instruction in school and the PH Sarawak supported the reply from the Federal Education Minister. I would like to remind Honourable Member of this august House Paragraph 17(a)(i) of the IGC Report gives us the right of using English as medium of instructions.

Tuan Speaker, I just mentioned here very briefly on the promised made by the PH Government on the recognition of Unified Examination Certificate (UEC). Now we do not know when it will be recognised. Fortunately, for Sarawak we have no such problem as Sarawak Government has recognised few years ago as announced by our late Tok Nan. In addition, Tok Nan gave cash to the 14 Chinese Independent middle Schools, RM3 million for 2014, RM4 million in 2015, RM5 million in 2016, RM6 million in 2017 and followed by our Yang Amat Berhormat Chief Minister with RM 7 million for the 2018. I would like to say thank you so much to our both late Tok Nan and our Yang Amat Berhormat Chief Minister.

Tuan Speaker, my fellow Honourable Members, rather than waiting for PH Federal Government to solve the education problem, I think it is quicker and more effective for us to take back our education autonomy. Let us be in charge of providing the best education system for our people. No more flip flop education policies, no more inaccurate history on formation of Malaysia, total recognition of UEC and setup more English medium schools.

Referendum Ordinance

Tuan Speaker, I would like to touch on the word “Referendum”. To my mind we need to distinguish between Federal Referendum Act and Referendum Ordinance. Referendum Act is a Federal matter and will be for Parliament to consider and to enact if they so wish. But for the enactment of a Referendum Ordinance, it is for Sarawak State Legislative to consider and provide a Bill for debate.

It is a direct form of democracy for our people to decide on important matters where it is more challenging and thus not possible for 82 Honourable Members in this august House to decide on behalf of all Sarawakians.

In this juncture, I would like to suggest that proper and adequate studies be carried out with the view of introducing Referendum Ordinance in this august House next year.

Converting Leasehold Land to Freehold Land

Tuan Speaker, owning a house is a dream for everybody and after having a house heavy commitments come in, like monthly payment of mortgage instalment, payments of electricity bills, assessment rates and at times maintenance works. Presently most of the residential land in town and sub-urban are leasehold. I would like to urge our Government to look into creating policies and frameworks to allow conversion of leasehold residential land to freehold land, in urban as well as sub-urban areas including the private ownership of agricultural land. This will provide our people with the most complete form of ownership, inperpetuity.

With the freehold land, our people no longer need to worry on payment of premium to renew the tenure of lease. I am confident that this will benefit all Sarawakians, eliminating their concern of renewing their land lease and also providing a peace of mind when their children inherit the land, they also do not need to renew the land lease. Ultimately, this will reduce the financial burden of the people.

Ban Public Smoking

Tuan Speaker, it is common knowledge that there are many non-smokers, pregnant mother, young infant and young children becoming victims of second-hand smoke. I am extremely concerned of the adverse health effect of second-hand smoke on their health.

Studies concluded that non-smoker inhaling second-hand smoke is 30% more likely of suffering lung cancer, stroke and many other types of cancer compare to the smoker himself. Infants and children will experience more frequent and severe asthma attacks and respiratory infections.

I appreciate that it is entirely up to a person whether he or she would like to smoke but we should be mindful of others who are non-smoker, that they too have the right to clean air. Therefore, it is imperative for the Government to formulate guidelines to regulate smokers to smoke in a controlled environment so his action has absolutely no adverse health impact on others.

Relevant local authorities need to start imposing strict bans and enforcing fine on people caught smoking at public places including workplace, five-foot way, open air eatery, coffee shops and street hawkers.

Tuan Speaker, I am pleased to note that Dewan Bandaraya Kuching Utara (DBKU) is in the process of gazetting a law to prohibit people from lighting up cigarettes in the identified smoke-free public areas. It is my hope to see that other local authorities will also follow DBKU initiative and one day we can have smoke-free public areas for the whole Sarawak.

Hopefully of course, this will also encourage smokers to kick back their habit; ensuring a healthier lifestyle for our people and cleaner environment with less litter of cigarette butts. Yesterday I write in the newspaper even our State Secretary are asking our Government Servant to give up smoking. That I think is a good start.

Deputy Speaker

You got one minute to conclude.

Conclusion

Tuan Speaker, one minute, I have to look for the best one to conclude it. For the information of the Honourable Members of this august House, Barisan Nasional was formed on the 1st day of January 1973 and after 9th May 2018, PRU14 election, majority of the component Parties left and Barisan Nasional, for all intent and purposes, is 45 years only.

Out of these 45 years, our Prime Minister Yang Amat Berhormat Tun Dr Mahathir was in the cabinet for 30 years, namely,1974 to 1976, Minister of Education, three years; 1976 to 1981, Deputy Prime Minister for five years; 1981 to 2003 Prime Minister, 22 years in total 30 years out of 45 years Barisan Nasional.

Now, let me end my speech with this thought, "people outside are watching us, both GPS and PH Honourable Members of this august House, what we said, what we promised, what we did and what we did not do, ultimately they will judge us".

With this, I wish to express my full support for the Supply Bill (2019), 2018. And I would like to this opportunity to wish all our Honourable members, political secretaries, heads of departments and staffs who are Christians and all Christians in Sarawak, Merry Christmas and a Happy and Blessed New Year 2019 to all Sarawakians.

Thank you.

Deputy Speaker

Ahli-Ahli Yang Berhormat, the sitting is adjourned and we shall resume at 2:30 this afternoon.

(Mesyuarat ditangguhkan pada jam 1:10 tengahari)

(Mesyuarat dimulakan pada jam 2.42 petang)

[Timbalan Speaker mempengerusikan Mesyuarat]

Deputy Speaker

Ahli-ahli Yang Berhormat, we shall now renew the debate on The Budget. I now call upon Yang Berhormat for Balingian.

Encik Abdul Yakub bin Haji ArbiPBB · GPSBalingianEN

Thank you, Mr Speaker. Bismillahirahmanirahim. Assalamualaikum warahmatulahi wabarakatuh. Greetings of peace and greetings to my motherland. Thank you for the opportunity given to me to take part in the Debate on the Rang Undang-Undang Perbekalan (2019), 2018 and the motion to refer the Resolusi Anggaran Perbelanjaan Pembangunan 2019, which were tabled by Yang Amat Berhormat Datuk Patinggi Ketua Menteri merangkap Menteri Kewangan Sarawak in this honourable House on 5 November last.

Firstly, I would like to welcome the arrival of the youths of N.58 Balingian to the Sarawak State Legislative Assembly today. On behalf of the people in the N.58 Balingian constituency, I extend my heartfelt congratulations and well done to Yang Amat Berhormat Datuk Patinggi Ketua Menteri, who successfully tabled our State Budget. It is the largest budget in history.

The essence of the budget shows the sincerity, concern and commitment of the Sarawak State Government under the Gabungan Parti Sarawak (GPS) to develop Sarawak, which we dearly love. The political landscape of our country has changed, but our noble aspiration to advance and develop Sarawak and its people will continue to be pursued. This noble aspiration to drive development will have a high impact, especially on rural areas such as my constituency.

So, love Sarawak, our land where we were born. We must thank and appreciate the efforts of our GPS Government to develop Sarawak with a historic budget. To my friends who sit beside us, I advise you not to be too obsessed with your political supremacy. Do not, for the sake of political agendas, neglect the State of Sarawak that we love. Do not become like the proverb "kera di hutan disusukan anak dipangkuan mati kelaparan" (the monkey in the forest is breastfed while its child on its lap dies of hunger). Let us together support this historic budget for the sake of our motherland, Sarawak.

Mr Speaker, I hereby fully support the suggestion of the Honourable Member for Daro and the Honourable Member for Beting Maro regarding the proposal to establish the Coastal Area Development Authority or in short (CADA). It is hoped that the parties concerned can realise the dream of the coastal people.

Mr Speaker, with this opportunity and space, I would like to raise 17 priority issues from my constituency. We humbly request that our GPS Government can provide allocations.

Jambatan Penakub Ulu Teh

To build the proposed bridge. The proposed bridge will be approximately 150 metres long with a Reinforced Concrete Permanent Bridge (R.C. Permanent Bridge). The road width of the bridge is 7.4 metres, 2 traffic lanes and 1.8 metres for a concrete pedestrian walk on both sides of the bridge. The estimated cost for this project is RM30 million. With the construction of this bridge, it will become an alternative bridge for my constituency and also the N.58 Tellian constituency.

Tellian Bypass (Jalan Basung ke Bandar Mukah)

The distance from Bandar Mukah to Penakub Ulu is approximately 10 kilometres. The proposed construction of this road will shorten the distance by up to 2.5 kilometres, linking Penakub Bazaar, Kampung Sesok Baru/Lama, Teh Labak and Kampung Sau. Besides that, it will be able to overcome the traffic congestion problem on Jalan Kampung Tellian, especially during "peak hours". The components of this project include the construction of approximately 2.5 kilometres of R3-standard road with an estimated cost of RM12.5 million.

Jalan Penakub Ulu-Tabo

We request a project to upgrade the road from Kampung Penakub Ulu to Kampung Tabo, which is estimated to be four kilometres long. Every year at the start of the year, the roads in this area are always submerged by floods up to a level of four feet, and this causes complete cut-off of access. This makes it difficult for residents to obtain food supplies and carry out daily affairs.

Service Centre Kuala Balingian

I request the Government and the relevant agencies to expedite the physical development and the various other facilities needed at the Service Centre Kuala Balingian so that it does not remain neglected as it is now. I propose that Rehat dan Riadah (R&R) facilities be developed urgently in keeping with its location. The impact of these facilities will improve the economy of local residents and become a popular stopover for coastal road users. Likewise for the Service Centre Matading.

Rumah Mampu Milik

Congratulations and thanks for the budget allocation of RM141 million allocated to help the Rumah Mampu Milik (Affordable Homes). Therefore, I represent the residents in my constituency in requesting that they receive a share of the said allocation. It would be advisable for applications for this matter to be relaxed to applicants who are single as well, rather than restricting it only to applicants who are already married.

Membina Pejabat Daerah Kecil Balingian dan Pejabat Majlis Daerah Dalat dan Mukah Cawangan Balingian

The Balingian Small District Office only rents premises in a shophouse building that is not suitable to accommodate an office for administrative purposes. Therefore, I request that a building be constructed, as I am informed that the site for that purpose already exists.

Here, I also request that a building be constructed to accommodate the office of the Dalat and Mukah District Council, Balingian Branch. The current office building is located in the erosion area of Tebingan Kampung Pulat, which is nearly collapsing into the river and is unsafe to occupy.

With the construction of these two buildings, it will fulfil the preparatory steps for the Balingian Small District to be upgraded in status to a Full District. This is the aspiration of the people of my constituency from long ago until now, who have always patiently waited like the owl longing for the moon.

Pembinaan SMK Balingian

Education is an important agenda of the Nation. The need to provide facilities for children is important in producing human capital development in the Malaysian society. Therefore, I request an explanation as to where the SMK Balingian, which had been approved before the change of the Federal Government, has gone?

SK Kampung Jebungan, Mukah

Please pay attention to the problem faced by SK Kampung Jebungan, which is caused by river erosion.

SK Kuala Balingian

The hostel block built using IBS is unsafe to occupy because the structure of the building has rusted. I request urgent action for the safety of the children who live in the hostel. As a safety measure, the residents of the hostel have been relocated to a temporary building.

Kesihatan

Health services in this state need to be improved. This is very important to ensure that the people receive proper treatment and health advice. To achieve this aim, I propose that a doctor be stationed at the Balingian Small District Health Clinic to handle any emergency cases.

Keselamatan

Security is an important issue in the life of society, whether in towns or rural areas. There is a need to build police posts to ensure security control in focal and high-risk areas, especially along coastal routes, industrial and plantation areas, including immoral activities involving drug trafficking and elements that can disrupt and destabilise society. Focal areas are divided into zones. Accordingly, I request that police posts be set up at the following places: -

Zone 1: Police post in the areas of Litong, Bunut, Tanjung, Sg. Alo and Tutus Ulu. Zone 2: Police post in the areas of Sesok, Sesok Baru, Sesok Lama, Penakub Bazaar and Kg. Sau. Zone 3: Police post in the areas of Temesu, Bayan Ulu, Bukit Ambun, Matading, Badengan and Bayan Tasik. Zone 4: Police post in the areas of Jebungan, Tegak, Penakub Ulu, Teh and Tabo. Zone 5: Police post in the areas of Kuala Balingian, Setuan Besar, Setejuk and Setuan Kecil.

Bekalan Air Bersih

We have been informed that the areas of Setuan, Kuala Balingian, Balingian, Bayan Ulu and Temesu have been listed under the stress area. Thank you, Minister of Utilities. The affected areas constantly face disruptions to the clean water supply. This problem is often made viral through social and electronic media, which brings political impact. Therefore, we request that this problem be addressed promptly.

Komunikasi dan Multimedia

At present, telecommunication signals in my constituency are unsatisfactory. I request that telecommunication signal receiving towers be added at the following places:

1. Penakub Cina, Kampung Sesok, Teh Labak and Kampung Sau; 2. Jebungan, Tegak, Penakub Ulu, Teh, Tabo; 3. Bayan Ulu, Matading, Temesu; 4. Bayan Tasik, Sebuloh, Liok and Maben; 5. Kuala Balingian, Setuan Besar, Setuan Kecil and Setejuk; and 6. Litong, Bunut, Tanjung, Sungai Alo and Tutus Ulu.

Pembangunan Belia

I request that a Community College be built in the Balingian Small District Town to accommodate youths and school leavers to receive training and skills as a preparatory step in providing skilled manpower.

Mini Stadium Balingian

I request that the Balingian Mini Stadium be upgraded to provide sports facilities. The upgrade should be accompanied by a package including the construction of a grandstand, subsoil drains for the football field, and facilities for field and track events, including a drainage system for the mini stadium area. With a standard mini stadium, it will be easier for the people to relax and adopt a healthy lifestyle.

Penubuhan Digital Farm

The Balingian area has 2 coal-powered plants with a capacity of 2 x 300 MWt and 1 x 30 MWt under the Mukah Power Generation Plant.

As stated by YAB Ketua Menteri, the economic catalyst in the future will be through the Digital Economy. Among them is the development of "Data Farm", which requires a great deal of electricity that is continuous or "uninterrupted power supply".

Therefore, the Mukah Division, especially in the Balingian area, is a very suitable place to develop a "Digital Farm". Apart from economic promotion, it can also place the Mukah District as one of the centres for IT development and encourage employment opportunities for our children in the future.

Masalah Penempatan Kampung Extension

The problem of settlement in the kampung extension and also the service centre where there is a lot of land that has been given cannot be built on as among the conditions are:

(a) Not having a house anywhere in the State of Sarawak; and

(b) Having a fixed income.

It is proposed that the selection committee at the division/district level be chaired by us together with Puan Residen, and its members consist of the Honourable Members of the constituency, the Ketua-ketua Kaum (heads of ethnic groups), apart from officers of the Lands and Surveys Department and other relevant departments.

Mr Speaker, to all fellow Members of the House who are Muslims, happy celebrating Maulidur Rasul; to friends who are Christians, I extend my greetings on the approaching Christmas Day and a happy welcome to the New Year 2019 to all fellow comrades in this House in particular, and to all the people of Sarawak in general.

Hereby I request full support for the Rang Undang-Undang Perbekalan (2019), 2018 and the Motion to refer the Resolusi Anggaran Perbelanjaan Pembangunan 2019.

That is all. Wabillahitawfiq walhidayah. Wassalamualaikum warahmatullahi wabarakatuh.

Thank you.

Deputy SpeakerEN

The Honourable Member for Tanjung Datu.

Terima kasih, Tuan Speaker. Thank you very much Datuk, Sir, for giving me the opportunity to participate in the debate on the Supply Bill (2019), 2018 that was tabled by the Right Honourable Chief Minister on November 5th 2018 in this august House.

Sebelum saya memulakan ucapan saya, saya ingin mengalu-alukan kehadiran ahli Wanita PBB Kawasan N.3 Tanjong Datu. (Applause)

I would also like to congratulate fellow Honourable Members on the constructive contents of their speeches on the Budget and also on other issues close to their hearts. The issues were articulately deliberated and, in some instances, expressed with full emotions.

These show that our members are working hard for their respective constituents all for the benefit of the rakyat. And needless to say, we are always working very hard, putting the rakyat first, be there election or not, be there opposition or not, rain or shine we all know our priorities.

It is, therefore, opportune for me to congratulate the Right Honourable Datuk Patinggi Dr. Haji Abdul Rahman Zohari Bin Tun Datuk Abang Haji Openg, Chief Minister, also Minister of Finance for the extraordinary Budget for 2019 presented to us. Never in the history of this august House or Sarawak for that matter, budget of RM10.513 billion revenues against RM10.391 billion of ordinary expenditure, generating a RM122 million surplus, is presented.

The proposed 5% sales tax on petroleum products is indeed a bold and unprecedented move, generating expected revenue of RM3.897 billion in 2019. This move deserves the support of members. I am sure Sarawakians from all walks of life would rally closely behind the Chief Minister on this courageous move.

The Budget also proposed to allocate RM9.073 billion for development. More so that the budget is rural biased. Meaning the main beneficiaries of the budget are the rakyat in the rural areas of Sarawak.

This augurs very well for the overall socio-economic development of the State, in tandem with the objective of achieving a balanced development between rural and urban.

Congratulations again Chief Minister.

On a separate note, I would also like to take this opportunity to congratulate the Chief Minister on the unanimous approval on the setting up of the MA63 Consultative Committee by this august House. Even more so that two very prominent women, YB Sharifah Hasidah Binti Syeed Aman Ghazali, Assistant Minister for Law, State-Federal Relations and Project Monitoring and also YB Irene Mary Chang Oi Ling, Bukit Assek as members of the high-powered committee. The importance of this committee disregards political affiliation as the status, rights and privileges of our beloved Sarawak is paramount. On a lighter side, the appointment of these women is like adding spices to our soup.

Dalam pada itu, pelantikan dan pemilihan mereka ini amat tepat sebagai bukti pengiktirafan terhadap keupayaan wanita dalam politik.

Pada masa yang sama, ini membuktikan penyertaan wanita dalam pentadbiran dan membuat keputusan pada peringkat negeri malah negara sentiasa menjadi agenda utama Kerajaan Negeri Sarawak di bawah pimpinan Yang Amat Berhormat Ketua Menteri.

Projek Berkaitan Langsung Dengan Bajet 2019

Tuan Speaker, ingin saya teruskan ucapan ini dengan menyentuh beberapa perkara khusus di dalam Bajet yang berkaitan dengan kawasan saya, N.3 Tanjong Datu.

Jambatan Sungai Rambungan

Projek pembinaan jambatan merentangi Sungai Rambungan memang telah lama dirancang dan telah mendapat kelulusan Kerajaan Persekutuan sebelum ini. Namun projek

ini telah dibatalkan oleh Kerajaan Persekutuan tanpa alasan yang munasabah. Ini amatlah mendukacitakan saya serta rakyat di Tanjong Datu.

Namun, sekarang saya serta seluruh rakyat Tanjong Datu khasnya dan Sarawak amnya amat berterima kasih kepada Yang Amat Berhormat Ketua Menteri, siapa yang telah menyediakan peruntukan di dalam Bajet 2019 untuk mengambil alih pembinaan jambatan Sungai Rambungan ini. Ini menggambarkan keperihatinan Yang Amat Berhormat Ketua Menteri dan Kerajaan Negeri terhadap keperluan rakyat.

Saya difahamkan bahawa kerja-kerja awal telah pun dilaksanakan oleh Jabatan Kerja Raya sebelum pembatalan mengejut oleh Kerajaan Persekutuan.

Oleh itu, saya berharap kerja-kerja ini akan bersambung semula dan dapat dimulakan dalam masa yang terdekat ini. Jambatan ini akan membuka peluang yang sangat luas untuk meningkatkan kegiatan sosio-ekonomi rakyat setempat.

Lanjutan kepada pembinaan jambatan Rambungan ini, saya juga difahamkan bahawa Kerajaan Negeri telah meluluskan peruntukan dalam lingkungan RM100 juta untuk menggantikan lapan buah jambatan bailey bridges dengan jambatan-jambatan konkrit di sepanjang jalan Rambungan/Sampadi/Lundu. Saya berharap projek ini akan dapat bermula dalam masa yang terdekat.

Dengan terbinanya jambatan-jambatan ini nanti, maka pemanduan serta perjalanan dari Bandaraya Kuching ke Lundu dan Sematan akan menjadi lebih selesa dan selamat. Hasil-hasil tani dan produk keluaran rakyat setempat juga akan dipasarkan dengan lebih mudah.

Bau/Lundu/Sematan Regional Water Supply

Secara keseluruhannya, sebanyak RM190 juta diperuntukkan untuk sembilan projek bekalan air di Sarawak, dan termasuklah di kawasan Bau, Lundu dan Sematan.

Saya mendapat tahu bahawa projek ini telah dirancangkan semenjak 10 tahun yang lalu dan oleh itu kami di Tanjong Datu amat bersyukur kerana tidak perlu menunggu 10 tahun lagi untuk mendapat bekalan air terawat. Terima kasih di atas peruntukan tersebut.

Estet Perindustrian di Sematan

Sejumlah RM85.3 juta diperuntukkan untuk membangunkan lima estet perindustrian di mana salah satu daripadanya adalah di Sematan. Sekali lagi saya ingin mengucapkan terima kasih kepada Yang Amat Berhormat Ketua Menteri atas peruntukan tersebut. Saya yakin, penduduk tempatan di Sematan dan Lundu akan dapat merebut peluang ini untuk melibatkan diri dalam perusahaan kecil dan sederhana, khususnya dalam pengeluaran produk berasaskan sumber dari laut.

Oleh itu saya menaruh harapan yang tinggi agar jabatan serta agensi yang terlibat dapat menyegerakan pembangunan estet perindustrian ini supaya dapat direalisasikan serentak dengan siap nya terbinanya Lebuhraya Pan Borneo dari Telok Melano ke Sematan tidak lama lagi.

Saya dengan ini merakamkan jutaan terima kasih kepada Kerajaan Persekutuan kerana tidak membatalkan projek lebuhraya ini. We will give credit where it is due. However, the same cannot be said of other projects that has been cancelled, despite already being approved by the Federal Government. The Rambungan bridge for example.

Rumah Spektra Permata di Lundu dan Sematan

Lundu dan Sematan juga mendapat sejumlah peruntukan daripada keseluruhan peruntukan sebanyak RM141 juta untuk projek pembangunan perumahan. Lundu dan Sematan diperuntukkan untuk membina tidak kurang daripada 50 unit masing-masingnya Rumah Spektra Permata atau RSP. Tapak untuk kedua-dua lokasi ini sudah pun sedia.

Saya berharap agensi yang terlibat dapat memulakan kerja-kerja awal secepat mungkin agar projek ini dapat dimulakan sebelum berakhirnya suku pertama tahun hadapan. Dalam pada itu saya amat yakin Kerajaan akan dapat menyalurkan peruntukan tambahan untuk meningkatkan lagi bilangan rumah-rumah RSP ini apabila keperluan meningkat.

CENTEXS Lundu

Pembinaan CENTEXS Lundu sudah bermula dan dijadualkan untuk siap pada suku keempat tahun 2020. Untuk itu saya mengucapkan syabas kepada Yayasan Sarawak atas pengurusan projek yang baik dan berharap agar pembinaan ini akan terus dilaksanakan dengan baik dan lancar.

Dengan peruntukan yang disedia dalam bajet tahun hadapan, saya mempunyai harapan yang tinggi agar Yayasan Sarawak dengan CENTEXS dapat menyediakan kursus-kursus berasaskan hospitaliti dan eko-pelancongan, bersesuaian dengan persekitaran yang ada di Lundu dan Sematan. Namun saya juga membuat penekanan tentang kursus-kursus lain berasaskan pembinaan. Dengan kursus-kursus ini, maka para belia di Lundu dapat dilengkapkan dengan kemahiran-kemahiran tertentu yang diperlukan oleh pasaran dan industri.

Master Plan for the Development of Lundu and Sematan

Tuan Speaker, the Master Plan for Development of Lundu and Sematan was commissioned by the State Government through the State Planning Unit (SPU) in 2014 and subsequently the report was published in 2015. The objectives of the development plan are to increase economic activities, raising the standard of living for local communities and to achieve a sustainable development.

One of the four recommended strategic thrusts is to use tourism to lead local economic development in Lundu and Sematan. I totally agree and accept without hesitation that tourism development is the way forward for Lundu and Sematan. And I have been saying this since I first spoke in this august House two years ago.

My concern is that despite the study and the report, there has not been any apparent development either in the planning nor the execution of the recommendation put forth by the report duly commissioned by SPU.

I know that some of the projects announced and approved by the Government will contribute to the tourism development in Lundu and Sematan, but what we need to see is the adoption of the recommendations either partially or in full into a well structured Master Plan that could be utilized by every Department, Agency or the Private Sector in providing either infrastructures or services.

I would very much like to see that tourism development in Lundu and Sematan is a well planned industry as opposed to a haphazardly concocted tourist area. I want Lundu and Sematan to become a premier eco-tourism destination in the region and maybe not too far-fetched, in the world.

Westermost Tip of Borneo – Where Borneo Begins

Still on tourism, with the completion of the highway from Sematan to Telok Melano, it would be a worth-while undertaking to chart and build the necessary landmark to signify the westernmost tip of Borneo. This would be similar to the landmark in Cape Agulhas, as the southernmost tip of Africa, Cape Horn as the southernmost tip of South America.

Closer to home we have Tanjung Simpang Mengayau in Kudat, Sabah as the northernmost tip of Borneo. We can in addition to the lighthouse in Tanjong Datu, build a special landmark that signifies “Where Borneo Begins”’. I believe there is already a special postcode 94111 assigned to the lighthouse. This would definitely bring in the tourists both from near and afar as Tanjung Datu itself is rich in history especially in the early days of maritime exploration by the Chinese, Dutch, Portugese, Spanish and the English.

Salako Cultural Centre

Lundu and Sematan is home to about 9000 Selako or Selakau, a sub-ethic group of the Bidayuh community. In my constituency, Selako settlements are in Pueh, Sebat and Siru numbering about 2000. There are of course more in the Opar constituency.

Selako are a small minority group and they also contribute to nation-building. Majority are farmers and some are employed in the civil service, uniformed and armed service and quite a number doing small business and also in the private sector. A small number of youths are also working in cities and towns. Some are in the Klang Valley and some are also in Johor. I, for one would like to see that the unique culture and traditions of the Selako people are fully made known. Some of us may not know the famous ‘Wek Jongan’ song and dance, the unique Pueh Longhouse on the food of the scenic Gunung Pueh, and of course the unique food of the Selako people.

Therefore, as part of the recognition for the Selako people, I would like to see that the Government approve both land and allocation for the setting up of the Selako Cultural Centre in Semantan, preferably in Pueh. This centre can undertake the promotion and the preservation of the language, culture and traditions as well as document the rich history of the Selakos.

I believe this initiative would benefit not only the Selakos but also all Sarawakians and Malaysians in general. My office would certainly offer full assistance to ensure that this initiative come to fruition.

Kemudahan Awam

Kami di Tanjong Datu amat bertuah kerana sudah mempunyai beberapa kemudahan awam yang baik, umpamanya Stadium Mini, Dewan Masyarakat, Tebingan Sungai, Pusat-pusat Penjaja, Perpustakaan Awam dan sebagainya. Ini membuktikan betapa prihatinnya Kerajaan Negeri dari semenjak dahulu lagi mempunyai pendekatan yang strategik menyediakan kemudahan-kemudahan ini. Namun apa yang ingin saya nyatakan di sini adalah perlunya Kerajaan menaik taraf Stadium Mini Lundu ke satu tahap yang lebih baik, seperti menyediakan lebih banyak tempat duduk penonton, lampu limpah, electronic scoreboard serta peralatan-peralatan sukan yang lain. Penaik tarafan stadium mini ini akan membuka ruang dan peluang yang lebih besar untuk Lundu menjadi venue alternative bagi sukan-sukan bertaraf kebangsaan dan antarabangsa. Saya yakin ini boleh tercapai, kerana dengan siapnya lebuhraya pan Borneo nanti, perjalanan ke Lundu akan menjadi lebih lancar, selamat serta mengambil masa yang lebih singkat.

Dalam pada itu, ianya juga menyediakan kemudahan yang lebih lengkap untuk para belia serta penggiat sukan di Daerah Lundu. Sekolah-sekolah dari Daerah Lundu seringkali menunjukkan kecemerlangan pada pertandingan sukan peringkat Bahagian, Negeri dan juga Kebangsaan. Sukacita juga saya maklumkan kepada ahli-ahli Dewan yang mulia ini, Lundu adalah venue yang amat sesuai untuk outdoor sports, dan juga sukan lasak seperti marathon, trialhtlon, mountain biking, jungle trekking, camping, para gliding, snorkeling dan sebagainya. Oleh itu, saya menyeru agar jabatan, agensi serta persatuan-persatuan sukan berkaitan untuk datang ke Lundu dan Sematan untuk meninjau kesesuaian. Saya yakin mereka will agree with me.

In line with the advent of e-commerce and the digital economy initiatives by the State Government, it is imperative that other supporting components, such as banks and and courier or delivery service are also in place. As it is, there is only one commercial bank and a small post office in Lundu. I believe there are rooms for improvements in these areas.

Therefore, I am recommending financial institutions to place Lundu on their map for expansion because with all the socio-economic initiatives and activities being carried-out, Lundu’s development will accelerate with an afterburner…(interruption)…

Deputy SpeakerEN

The Honourable Member for Tanjung Datu.

I am also recommending that the small post office be improved and extended to cater for the eventual increased in postal traffic.

Deputy SpeakerEN

The Honourable Member for Tanjung Datu, you got one minute to wind up.

Short.

Rural Transformation Projects

In the interest of time, let me briefly touch on the Rural Transformation Projects or RTP and also Program Penambahbaikan Rumah Miskin.

RTP was introduced two years ago and have positive impact on the people. The projects are implemented via close engagement between the administration and the ADUNs. We are very fortunate that the State has the capacity to allocate a sum of RM5 Million per constituency that is only 72 constituencies.

RTP is unique to Sarawak and within the next two years, the rakyat will definitely get to benefit from the various projects. Therefore, I urge my colleague ADUNs to capitalize on these allocations, engage with the administration to ensure that all RTP projects are implemented well.

Program Penambahbaikan Rumah Miskin Sarawak

Saya amat terharu dan berterima kasih kepada YAB Ketua Menteri atas kelulusan untuk Program Penambahbaikan Rumah Miskin di Sarawak dan kawasan saya pun akan turut banyak menikmati hasilnya. Program ini merupakan satu inisiatif untuk membantu rakyat luar bandar yang berpendapatan rendah. Walaupun amaunnya tidak besar, namun nilai dan impaknya kepada penerima projek adalah amat besar dan memberi makna yang mendalam. Oleh itu saya berharap projek ini akan diteruskan pada masa akan datang.

Coastal Area Development Agency

Give me one minute, Tuan Speaker. YB Daro, YB Beting Maro and YB Balingian menyentuh tentang penubuhan Coastal Area Development Agency, iaitu sebuah agensi khas untuk membangun kawasan pesisiran Sarawak. Memandangkan kawasan saya, Tanjung Datu adalah kawasan pesisiran, maka saya turut memberi sokongan terhadap cadangan tersebut.

Conclusion

We are very fortunate to inherit a stable and capable State Government, with sound public policy, all for the benefit of the rakyat. We also inherit a competent and efficient public service that translate and execute policies Government of the day. These elements are further manifested with the newly proposed extraordinary budget exceeding RM10 Billion and a development Budget exceeding RM9 Billion for 2019, and through the report presented by the Chief Minister on the performance of the State in 2018. We can only reach one conclusion that Sarawak is poised to reach greater heights and with the correct bearings through our State Government the target of achieving a high income economy by 2030 is just on the horizon. I would like to thank Yang Berhormat Datuk and all Honourable Members for their indulgence.

Saya mengambil kesempatan ini untuk mengucapkan Selamat Hari Krismas yang bakal menjelang serta Selamat Tahun Baharu 2019 kepada semua rakyat Malaysia khasnya untuk rakyat di kawasan saya N.3 Tanjung Datu. With that I beg to support the Supply Bill (2019), 2018.

Thank you. Assalamualaikum warahmatullahhiwabarakatuh.

Deputy SpeakerEN

The Honourable Member for Tellian.

Encik Yussibnosh BaloPBB · BNTellianEN

Thank you, Mr Speaker, for giving me the opportunity to debate the second reading of the Supply Bill (2019), 2018 and the Motion to Refer the Development Estimates for Expenditure for the Year 2019.

Greetings and warm regards to my homeland. First, I extend my heartiest congratulations to Yang Amat Berhormat Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Chief Minister of Sarawak, on being conferred the Honorary Doctorate in Economic Development by UNIMAS on 29 October 2018.

My heartfelt congratulations also to Yang Berhormat Datuk Dr Abdul Rahman Haji Junaidi, Deputy Minister of Rural Electricity (ADUN N.4 Pantai Damai), who was awarded the Panglima Gemilang Bintang Kenyalang (PGBK) Medal, which carries the title Datuk, and to Yang Berhormat Encik Abdullah bin Haji Saidol, Deputy Minister in the Chief Minister's Office (Corporate Affairs) (ADUN N.42 Semop), who was awarded the Johan Bintang Kenyalang (JBK) Medal in conjunction with the celebration of the 82nd Birthday of Tuan Yang Terutama Yang di-Pertua Negeri Sarawak on 13 October 2018.

Next, I congratulate all members of GPS for having a dynamic leader and the best economic planner at this time to lead the state of Sarawak in the digital economy era.

Little did I think it was fire, If the fire had no fuel source, Gentle though they are, they remain bold, Eye to eye, face to face.

This is proven by the extraordinary and largest budget proposal in Sarawak's history, namely a State budget of RM11.914 billion, with a large allocation for development amounting to RM9.073 billion and RM2.841 billion for management, in order to drive Sarawak as a developed state by 2030.

Once again, we see a large allocation amounting to RM6.049 billion or (67%) set aside specifically for rural development in Sarawak. When we speak of rural areas, we refer to basic facilities such as land transport roads, clean water supply and electricity supply for all residents in villages and longhouses, together with the vast expanse of land. This does not mean that rural areas previously had no such facilities. They did, but these were not comprehensive, as there are electricity grid lines that pass overhead but do not reach residents' homes, due either to the absence of transformers or the lack of electrical power, or in our words "karan lagik belum ada", which prevents the supply from being connected to consumers. The time has come for residents of the rural areas concerned to be able to not only see it but also to be able to use it.

Likewise with clean water supply, where the water pipes are still not filled. The time has come for them to be filled with treated water to be connected to consumers who truly wish to enjoy facilities like those in the towns.

Land transport road facilities also already exist, whether they can be traversed by four-wheel-drive vehicles or footpaths for walking, or for residents who still wish to use the alternative route by means of small boats, as practice for the "Regatta" held every year. Today, we extend our thousandfold thanks to the State Government of Sarawak for regarding these three basic facilities as their priority in the rural areas.

Mr Speaker, the Pan Borneo Highway, officially launched on 31 March 2015 at the Bakun junction, Mile 32, Bintulu-Miri Road, has opened a new chapter for the development of Sarawak, as conceived by the late Tok Nan. Although he jokingly described the condition of the roads before, the truth is that the late Tok Nan's joke had some truth to it, since for 50 years before this Sarawak still lagged in enjoying comfortable road facilities compared with other states in the Peninsula. What did he say? "Patah pinggang" (it breaks one's back), he said. Demands upon demands based on the Malaysian Agreement 1963 grew stronger and gained increasing support from all levels of society in this state.

I believe that our friends from the Peninsula who have worked and seen for themselves in Bumi Kenyalang also share the same aspiration to see balanced development between the regions within the Federation of Malaysia, to the extent that some of them have married local people and do not wish to return to the Peninsula.

We know that the people of Malaysia are so concerned to see the progress and prosperity of this nation that they were willing to donate to Tabung Harapan, even though their hopes were shattered when the promise was not kept by the Federal Government ruling at this time, with various excuses that it was not a holy book.

I wish to state once again that the Sarawak Gabungan Parti Sarawak (GPS) Government, which rules Sarawak and was given a mandate in the 11th Sarawak State Election held on Saturday, 7 May 2016, has not broken its promise and will continue to lead this state in the future. The people of Sarawak will not be taken in by empty promises like those made or that occur at the Federal level now.

In the 14th General Election held on Wednesday, 9 May 2018, the party ruling Sarawak also won parliamentary seats, with a majority of 19 out of the 31 seats contested. We did not suffer defeat at the state level, and rest assured that the people of Sarawak are still mature in choosing their representatives.

Mr Speaker, the Sarawak Budget 2019 proposal has outlined six main strategies in drafting the state's development and management agendas. I do not need to mention them one by one, as they are already contained in the budget speech delivered by YAB Chief Minister on 5 November last.

Once again, I extend my thousandfold thanks to the State Government of Sarawak under GPS, which is very different from the Barisan Nasional that previously broke the record for the State budget allocation to two (2) digits of billions, namely the largest in Sarawak's history.

Development expenditure allocation amounting to RM2.350 billion for walkabouts, RTP, MRP and PPRMS (Sarawak Poor House Improvement Programme) in order to fulfil promises and provide the best services to all the people of this State. The large allocation for these targeted projects is hoped to improve a comfortable life for the people, because this is the State Government they need to choose and vote for in the future. Why should we vote for "siakap sinohong, gelama ikan duri" with "dolak dalih" and the "bau hancing" done by the ruling parties of the new Malaysian Government now? I propose that the new Malaysian Government change the Jalur Gemilang from 14 stripes to only 3 stripes, if they truly wish to change.

Mr Speaker, allow me to put forward several proposals for the progress and welfare of Sarawak and the area I represent, namely N.57 Tellian.

Other Operating Expenditure

The allocation of RM2.841 billion for other operating expenditure draws my attention to how important training and placement are for youths and graduates who are currently unemployed. I request that volunteer positions, or CBG (Capacity Building for Graduates), be re-established in all State Government departments as training for youths and graduates to gain work experience.

From my experience in leading a government office, most of these people have already obtained jobs in private companies as well as in existing Government departments, because through such placements they gained experience, whether they obtained jobs in Sarawak or outside Sarawak, together with private companies and Government departments. This is the best way I see for the State Government to train our graduates and youths in the field of employment and to gain experience for themselves.

Improving the Connectivity of the State

An allocation of RM1.105 billion for roads, bridges and jetties has also been touched upon in this budget. Therefore, I request that the dangerous junctions on main roads in my area, especially for road users at the Kpg Judan, Kpg Penat, Kpg Tellian Laut, Kpg Tellian Tengah junctions and the junction near Menara Pehin Setia Raja Mukah, which have caused many road accidents resulting in very serious injuries, be studied and improved to prevent them from continuing to occur, as we are village people, Mr Speaker. When we ride bicycles, we do not know how the road traffic laws are for crossing junction areas. That is why we want the relevant departments to study this and that the RM1.105 billion be divided among these proposals.

It is also proposed that a new bridge be built at Kpg Tellian Ulu crossing Sg. Tellian, as the existing wooden bridge is very dilapidated and can only be used by motorcycles and bicycles. With the increasing number of vehicles and the growing population using this only bridge in the area, urgent action is needed from the Government, and the opposition has already used the bridge issue as their campaign material every time there is an election.

Strengthening Agriculture Development

In my view, agricultural development must also be looked at through replanting trees that have been expanded or felled by companies or by the relevant departments.

The allocation of RM315 million to drive agricultural transformation towards modern, competitive and sustainable agriculture, in providing employment opportunities and improving the economy of residents, also needs to be emphasised. Therefore, I propose that the failure, that is the failed project of nipah palm planting under LCDA, be replaced with other crops apart from oil palm, namely crops that are profitable within the next 5 to 10 years. For example, by planting Kelampaian wood or Jabang wood to be made into plywood in the future in Mukah. Likewise, Engkabang wood, which can grow in swampy land, can bring profit in terms of tax and royalties to our State.

Batang Mukah Bank Erosion Control Protection Project

Another proposal request is for a bank erosion control protection project for Batang Mukah and river bank stabilisation from Sungai Penakub Hilir to the mouth of Sungai Tellian, which needs to be carried out, estimated at a length of 1,450 metres with an estimated cost of RM98 million, which is also an important project for the following purposes:

i. It is a residential area and there is public infrastructure facilities such as a mosque, hall and so on in the surrounding area;

ii. Making it a suitable place for recreational facilities and walking for local residents so that they become healthier and more energetic; and

iii. Beautifying the bank section of Batang Mukah and promoting the local tourism industry, especially during the Regatta Mukah and during Pesta Kaul, when they can gather here, whether local tourists or foreign tourists.

If immediate steps are not taken to address this problem, the area will be threatened by an erosion rate of 0.5 metres a year.

My fifth proposal: I also support the speech of Honourable ADUN Daro, of ADUN Beting Maro, of ADUN Balingian, and of ADUN Tanjung Datu, that a coastal development agency be established in order to plan for and look at the needs of residents in the surrounding areas, most of whom are farmers and fishermen.

Before concluding, once again I extend my thanks to the staff of the State Legislative Assembly, the staff of the State Government and the staff of the Federal Government who have recorded and listened to the debates in this honourable House so very carefully.

Thank you also to the State Government for having allocated part of the RM112 million in its budget for the purpose of building PPKS Mukah.

Finally, I support the budget for the year 2019, and wish everyone a Merry Christmas and a Happy New Year 2019.

That is all, thank you.

Deputy SpeakerEN

The Honourable Member for Bukit Goram.

Terima kasih Tuan Speaker, kerana memberi peluang kepada saya untuk mengambil bahagian dalam perbahasan Belanjawan bagi 2019, 2018 yang dibentangkan oleh Yang Amat Berhormat Datuk Patinggi Ketua Menteri, merangkap Menteri Kewangan dan Perancangan Ekonomi Sarawak pada hari Isnin 5 November yang lalu di dewan yang mulia ini.

Disini juga saya ingin mengucapkan tahniah kepada Yang Amat Berhormat Datuk Patinggi Ketua Menteri di atas penganugerahan Ijazah Kehormat Doktor Falsafah Pembangunan Ekonomi daripada Universiti Malaysia Sarawak (UNIMAS) pada 29 Oktober 2018.

Tuan Speaker, sebelum saya menyentuh berkenaan dengan belanjawan Negeri, saya sekali lagi untuk mengucapkan terima kasih dan tahniah kepada Yang Amat Berhormat Datuk Patinggi Ketua Menteri kerana telah membentangkan bajet yang bersejarah sekali, berorientasikan pembangunan luar bandar dan pembangunan teknologi digital di Negeri Sarawak.

Dalam pembelanjaan tahun 2019, Kerajaan Negeri Sarawak telah mengagihkan peruntukkan sebanyak RM11.9 billion dimana 76% atau RM9.073 billion peruntukkan tersebut ialah untuk pembangunan dan 24% atau pun RM2.84 billion ialah untuk perbelanjaan mengurus. Perbelanjaan ini merupakan sejarah bagi Kerajaan Negeri Sarawak dan ini menunjukkan komitmen Kerajaan Gabungan Parti Sarawak (GPS) untuk melaksanakan program pembangunan yang mampan bagi Negeri Sarawak dimana 67% daripada peruntukkan untuk pembangunan adalah diagihkan untuk pelaksanaan projek luar

bandar dengan peruntukan sebanyak RM6.049 billion. Kita juga merasa bangga kerana bajet kali adalah juga adalah surplus bajet.

Tuan Speaker, the ‘Development Biased and Rural Focused’ Budget 2019 reflects the commitment of the Honourable Yang Amat Berhormat Chief Minister and the State Government to give greater focus on the implementation of programmes and projects in the rural areas and to accelerate rural development transformation for the benefits of rural communities to support a desired economic growth while at the same time opening up greater opportunities in the rural and remote areas for the economic prosperity of our community.

This certainly will ensure a balanced distribution of rural development throughout the state in line with the State Government’s effort to narrow the development gap between the urban and rural areas. It means placing greater priority on rural development by providing key infrastructures such as rural road connections, clean and safe water supply, electricity and other basic amenities for the rural areas.

This will create a conducive environment to attract private sectors to venture into viable economic activities like plantation, aquaculture, large scale food production and processing and other resources based value added industries. Thus, could bring in more capital to develop the economic potentials of the rural areas, creating cluster of related business that generates employment opportunities for the rural people.

Tuan Speaker, I would like to thank also Yang Amat Berhormat Chief Minister on the State Government’s initiative and bold move to introduce a new policy whereby every newborn child as long as they are Sarawakian will be given one-off incentive of One Thousand Ringgit (RM1,000.00) irrespective of ethnicity, religious beliefs and social status effective from January 2019. Even though this incentive can only be withdrawn upon attaining the age of 18 and it meant for their further education or as capital to pursue their career, I believed that it is of great benefit to the children as this will guaranteed them a certain amount of money to enable them to further their studies at the tertiary level later on.

Tuan Speaker, the budget 2019 support the State’s vision to maximize the potential of digital technology and digitalisation to bring Sarawak to the global digital playing field. As we are aware that the digital economy will become the key thrust of our future economy, a forward looking strategy that is fundamental for the success and prosperity of the State to accelerate and advance the State growth, reduce socio-economic divide, generate employment and business opportunities through e-commerce, harness talent and create value through innovation and entrepreneurship achieve e-Government for efficiency, trust and confidence.

Tuan speaker, here I would like to highlight several issues that affected my constituency, Bukit Goram.

Agriculture Development

I welcome Yang Amat Berhormat Chief Minister’s commitment in transforming the agriculture sectors into a modern, competitive and sustainable sector capable of generating new innovative businesses and high-value employment opportunities to make the State of Sarawak a net exporter of agriculture produce and products with an allocation of RM315 million for the implementation of the various agriculture programmes and projects for the Budget 2019.

The topographical features of the hinterland of my rural constituency N.63 Bukit Goram, is suitable for large scale plantation and farming such as rubber, pepper and other

suitable cash crops such ‘dabai’, pineapple, cocoa, vegetables and other crops include herbs. Therefore, I request for the Government to provide a fair share and more funding for the agriculture development in my constituency, Bukit Goram.

Infrastructure Development

Proposed Upgrading and Widening of Jalan Kapit/ Nanga Yong

Tuan Speaker, in the recent DUN Sitting in July, I also did raise the issue of the proposed upgrading and widening of Jalan Kapit/ Nanga Yong that begin at the junction of Jalan Bukit Goram to SESCO Sub-Station along Jalan Bleteh covering a distance of about 3 kilometre to reduce traffic congestion and facilitate better flow of traffic along that stretch of the road. With the completion of the Kapit/ Song, Kanowit road project, I anticipated that Kapit will be influx with a heavy traffic flow. To reduce traffic congestion and facilitate better flow or traffic therefore I would like to know the status of the proposed road upgrading and widening project.

Rural Electricity Supply

Tuan Speaker, majority of the rural population especially the longhouse community in my constituency of N.63 Bukit Goram although are connected by access road are yet to enjoy 24-hours supply of electricity. So in this respect, I strongly suggest to the Government and the authorities concerned that greater effort need to be done is that they can be connected to the state grid to enable them to enjoy 24 hours electricity supply without interruption.

And for those rural longhouses that might not be connected to the State grid in the time to come, I would like also to propose the implementation of Sarawak Alternative Rural Electrification Scheme (SARES) and here I would like to comment in my area two rural longhouses namely first Rumah Mesop at Sungai Entangai, Batang Rajang and second Rumah Ringga at Sungai Semujan, Ulu Belawai to be included in the SARES.

Water Supply

Tuan Speaker, water supply is one of the most important aspects of household needs. Clean, safe and treated water supply helps to ensure the health and well-being of the people.

I must thank the Government for upgrading of the piping system for treated and clean water supply for the people in Kapit town and kampongs. However there are many household in the suburban areas that are connected by road who were yet to receive clean water, treated and safe water supply that I would like the Government water supply to those areas in Kapit.

Telecommunication

Tuan Speaker, information technology has become a faster means of communication where the people could gain access to information fast and effectively.

I thanked the State Government that gives focus on the development of the digital economy. And the majority of the people in my constituency in N.63 Bukit Goram are still lacking in terms of information communication technologies especially in the rural areas that has low and most has no coverage for cellular phone service and also the WiFi-internet service.

Thus I called on the Government to build more telecommunication towers so as to provide better and more telecommunication services in my constituency in where areas such as Sungai Menuan, Sungai Belawai, Sungai Ibau, Sungai Melipis, Ulu Yong and along the Batang Rajang areas.

Repair of Dilapidated Schools

Tuan Speaker, I welcome the State Government for the allocation of RM81.7 million for the rebuild, repair and upgrade, including providing water and electricity supply for dilapidated schools in the State of Sarawak.

Most if not all schools in Bukit Goram constituency are in a dilapidated State that need upgrading, refurbishing and repair. Hence it is my hope and wish that those schools in my constituency to be allocated a fair share of the allocation.

More Haemodialysis Machine for Kapit Hospital

Tuan Speaker, statistic from the Health Department Kapit revealed that Kapit now has 58 registers kidney patients while Song recorded some 20 kidney patients who needed to undergo haemodialysis treatment three times a week.

For Kapit, the Hospital has 15 haemodialysis machines that run to its maximum daily on shift from morning until late at night. Some of the patients have to be referred to Song Health Clinic for haemodialysis treatment where the five haemodialysis machines at the clinic are also fully utilised.

To cater for the needs of the patients, Kapit Hospital needs more haemodialysis machines for the treatment of kidney patients.

So due to the limited space available for haemodialysis treatment, therefore, I would like to request the authority concern to build a new building at the vicinity of Kapit Hospital especially for Kidney patients to undergo haemodialysis treatments.

Providing Affordable Housing (Rumah Mampu Milik)

Tuan Speaker, everyone’s wish to have a decent home for their family. Nevertheless, not all can afford to buy a house if their own due to their financial burden.

I thanked YAB Chief Minister for the continual effort to care for the well being of the people to undertake the various housing projects targeting the lower income group where some RM141 million was allocated for the building of Rumah Mampu Milik. It is my hope and wish that more Rumah Mampu Milik to be build in Bukit Goram constituency.

I am glad to note that Kampung Kapit Baru Redevelopment Project Kapit, Kampung Baru Kapit have been included under the 2019 Budget and on behalf of the people of Kapit, I would like to thanked YAB Chief Minister for your understanding on the needs of the rural people.

Upper Rajang Development Agency (URDA)

Tuan Speaker, on behalf of the people of Kapit and Bukit Goram and Mid Rajang areas, I wish to thank Yang Amat Berhormat Chief Minister for the setting up of Upper Rajang Development Agency (URDA) that was aimed to develop Kapit Division and the Mid-Rajang areas.

I also would like to thanks YAB Chief Minister for allocating RM1.5 billion to URDA for the infrastructure and utilities development to develop areas under URDA. This will help to further improve connectivity and solve the water supply for the benefit of the people under URDA. So in addition those development projects upon completion could further spur the development in Kapit and the Mid Rajang areas.

And it is my hope that the relevant authorities could speed up the implementation of those development projects which will definitely benefit the people under URDA.

Tagang System at Sungai Tisa, Yong Kapit

Tuan Speaker, rivers are the main source of protein for the people especially in the rural areas. Undeniably that development such plantations, logging activities had some impacts as far as river pollution is concern. To ensure a sustainable supply of protein, initiatives such as the Tagang System is vital to ensure the people has a continuous supply of fishes for their protein needs.

I would like to thank the Ministry of Agriculture for their response to my request during the last session to revive the Tagang System at Sungai Tisa, Yong Kapit. The launching of the Tagang System was officiated by the Assistant Minister of Agriculture who is also the ADUN for Bukit Kota, Yang Berhormat Dr. Haji Abdul Rahman Bin Haji Ismail on 30 October 2018 with the release of 1,000 Empurau fish fries and 1,000 Tengadak fish fries into Sungai Tisa. The community of Sungai Tisa, Yong Kapit had expressed their gratefulness to the GPS Government for the reviving of their Tagang System project in the area. I hope that in the next three (3) to four (4) years time the fishes could be harvested.

Perimeter Survey of NCR Land

Tuan Speaker, under the National Budget 2019, there was no allocation by the Federal Government for the perimeter survey of NCR Land. Perimeter survey of NCR Land is very important as it is a precondition to enable the landowner to have a land title and prove ownership to the land. Land is an asset to the people and close to their heart especially the natives.

It is sad to note that the Federal Government and our friend the Pakatan Harapan representatives from Sarawak failed to look into the needs of the natives of Sarawak. I would like to request to the State Government to provide the funding to ensure the perimeter survey of the NCR Land to be continued for the benefit of the natives of Sarawak.

There are vast areas of NCR Land that are yet to be carries out under the perimeter survey in Kapit. It is my hope that Bukit Goram and Kapit in general will be provided with the fund to carry out the perimeter survey of NCR Land.

Perumahan Mampu Milik untuk Persatuan Veteran Angkatan Tentera Malaysia (PVATM) Kapit

Tuan Speaker, I wish to highlight on the welfare of our army veterans. It is heartening to know that many of them do not have a decent home to stay even after their retirement. I lauded PVATM Kapit for their initiative to buy a piece of land along Jalan Bukit Goram for their housing development project. However, until now the housing development project is yet to materialise due to the lack of funding for the levelling work and sub-division of the lots. I am happy to note that the State Government has allocated RM141 million for the development of Rumah Mampu Milik.

In this respect, to reciprocate sacrifice and dedication of the veterans towards the sovereignty of the country, I would like to suggest to the State Government to assist PVATM Kapit members to construct an affordable house (Rumah Mampu Milik) at their housing lots as a gesture for their sacrifice and great contribution to the country.

Setting Up of Sarawak Tourism Board in Kapit

Tuan Speaker, Kapit has great potential as a tourism attraction centre with its rich flora and fauna, culture, adventure and nature. There is a need for the setting up of Sarawak Tourism Board Office in Kapit to actively promote its product such as homestay, powerboat, Baleh Kapit Raft Safari, Pesta Kapit and other events so as to create Kapit as a tourism attraction centre in the central region.

New Jungle Produce Market for Kapit

Tuan Speaker, the completion of access roads to the rural areas such as Ulu Sungai Yong, Sungai Sut, Sungai Antaroh and Kapit/Song road had provided the opportunity for the people to open up their land for agriculture and provide easy means to market their produce to Kapit town. In addition, the paradigm shift in the mentality and methodology of the farming community from self-sufficiency to commercial farming has resulted in the famous Market Teresang in Kapit town to be overcrowded and the local authority concern has encountered many challenges to find a new and proper place for the farmers to sell and market their products.

To provide ample trading places for the farmers, I would like to request to the State Government to provide the funding to the local authority for the proposed construction of a new jungle produce market mainly for the selling and marketing of jungle produce and locally grown vegetables.

So with it, Tuan Speaker, untuk mengakhiri ucapan saya, dengan kesempatan ini saya ingin mengucapkan Selamat Hari Deepavali, Selamat Hari Krismas kepada yang beragama Kristian dan Selamat Tahun Baru kepada semua.

Dengan ini saya menyokong penuh Rang Undang-Undang Perbekalan (2019) 2018 dan Usul Untuk Merujuk Resolusi Anggaran Pembangunan Bagi Perbelanjaan 2019.

Sekian, terima kasih.

Deputy SpeakerEN

Honourable Member for Kabong.

Honourable Encik Mohd. Chee Bin Kadir: Thank you, Mr Speaker. In the name of Allah, the Most Gracious, the Most Merciful. Praise be to Allah, Lord of the Worlds. I give thanks that, by the leave of Allah SWT, I have the opportunity to debate the Sarawak state budget for 2019 in this august House.

Mr Speaker, let me, right from the outset, extend my congratulations and well done to the Right Honourable Chief Minister of Sarawak, Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari Bin Tun Datuk Abang Haji Openg, who is also the Minister of Finance and Economic Planning of Sarawak, for successfully tabling a historic budget for Sarawak. It is the largest budget in Sarawak's history, involving a large sum of RM11.914 billion, which tends towards development, especially rural development. This budget reflects the Government's efforts to ensure that the agenda of advancing Sarawak in all respects continues. This budget is a testimony that the State Government is very committed to intensifying and, at the same time, accelerating the implementation of various projects for the development of this State.

On behalf of the people of the N.40 Kabong constituency, I welcome the allocation of RM6.049 billion, or 67%, which has been set aside for rural development. This allocation of RM6.049 billion is much higher compared with RM3.062 billion for 2018. Thanks to the Right Honourable Chief Minister's concern for rural areas, I wish to record my immeasurable gratitude, and the people in the rural areas feel very grateful that their plight has been championed by the Right Honourable Chief Minister.

Mr Speaker, it is indeed acknowledged that managing State finances is an extremely challenging task. As a person who is meticulous, the Right Honourable Chief Minister has been able to craft a very good budget in which, although its expenditure is very large, we do not experience a deficit; in fact, we are expected to obtain a surplus of RM122 million. This time, the Right Honourable Chief Minister has proven that the Government did not use reserves at all, as was loudly claimed by certain parties. In fact, we have not touched a single sen of our reserves.

The Right Honourable Chief Minister has explained that the projected State revenue for 2019 is RM10.513 billion, an increase of RM3.547 billion, or 51%, compared with the revised revenue estimate for 2018 of RM6.966 billion. The Right Honourable Chief Minister will continue to strive to increase revenue in line with the provisions of the State and Federal Constitutions and the relevant laws, without burdening the people.

We are well aware that the Federal Government under Pakatan Harapan does not have the capacity to champion the plight of the people of Sarawak, especially those in the rural areas. We acknowledge that there is justification for reviewing mega projects that can be postponed, but we are very disappointed by the cancellation of small rural projects that are much desired and needed by the people. In my constituency of N.40 Kabong, small projects worth RM1.5 million had been approved by the Barisan Nasional Government, and those that were almost ready to be implemented were cancelled as soon as the Pakatan Harapan Government took power. It should be noted that my constituency is represented by a Pakatan Harapan Member of Parliament. Therefore, the people of N.40 Kabong, who gave their support to the Member of Parliament to win the last election, request the Pakatan Harapan Government to reverse the cancellation of projects that had already been approved earlier. These projects include improvements to roads, water supply and others, and are much needed by rural residents.

Mr Speaker, allow me to touch on several matters concerning the needs of the people I represent in N.40 Kabong within this short time. I am very grateful for the allocation of RM141 million to develop Rumah Mampu Milik and Rumah Spektra Permata. It is hoped that the Muroh Housing Scheme, Kabong will continue to be developed, where only 59 units have been built and 164 vacant lots still have not been developed with houses. Recently, the owners of the vacant lots held a dialogue with the Lands and Surveys Department, Betong Division, and I was also present. A resolution was made in which those who own the vacant lots asked that the Housing Development Corporation (HDC) continue the project. Most of the lot owners are unable to build houses because they are poor fishermen and farmers.

On behalf of the residents of Kabong, I wish to express appreciation to the Government because recently the State Planning Authority, on 26 October, approved the expansion scheme for Kampung Hulu Kabong, which can accommodate approximately 500 lots, with a project cost of RM42 million, to be implemented in phases. This approval is to replace the site that had been approved at Sungai Endot, which could only accommodate 60 lots. It should also be made known that the demand for housing lots by the residents of Kabong exceeds 1,000 lots.

Given how important a residence is for every individual, it is hoped that the relevant authorities or agencies will make early plans to identify and prepare suitable areas to be turned into Village Expansion Schemes at Kampung Gerigat, Kampung Nyabor, Kampung Sesang, Kampung Empelam and Kampung Alit.

Mr Speaker, there are several dilapidated schools in my constituency that have been identified for upgrading. Among them are SK Engkabang and SK Haji Junid Gerigat, which were to be built by Pan Borneo contractors as their Corporate Social Responsibility (CSR). Unfortunately, to this day, no construction work has been carried out at these two schools. The residents and parents in these two areas want to know whether the construction will continue or has been cancelled. If it has been cancelled, the residents of Engkabang and Gerigat respectfully request the State Government to continue what was cancelled by the PH Government.

The same applies to SK Abang Leman Kabong, which was supposed to receive new buildings. The people of Kabong want to know what the status is of the project to rebuild SK Abang Leman Kabong, which has been delayed for a long time.

The only secondary school within the Kabong state constituency (DUN Kabong) is SMK Kabong, which is still operating on two sessions. The two-session system is certainly not encouraged, and the Government should abolish it. Parents in Kabong request that the afternoon session at SMK Kabong be abolished, and they ask the State Government to provide allocations to build several classrooms so that all students can study in just one session. I call on the relevant authorities to look at this matter seriously and to help SMK Kabong solve this problem.

Water Supply

Mr Speaker, the water supply problem is very critical in the Kabong area. Praise be to God, we are very grateful and thankful to the YAB Chief Minister because he is so concerned and has approved RM87 million to overcome this problem. Among the projects that will be implemented are:

i. Pipe replacement and associated works at Kampung Hulu Laut and Kampung Hilir Laut Kabong costing RM200,000, and will commence this November;

ii. Pipeline from Gerai Persatuan Nelayan (wharf) to various kampung along the river bank, Kabong costing RM500,000, and will also commence this November;

iii. Pipeline from Cr. Ahim's house to Jalan Gerigat costing RM300,000, and will commence in November 2018; and

iv. Pipeline from reservoir at Roban junction to existing Kabong booster station complete with storage tank and associated works, Kabong costing RM60 million, and will commence in January 2019.

It is hoped that the said projects will be completed according to schedule because the people have been waiting for so long.

One more matter that I have never forgotten to raise in this House is the water supply to four longhouses in Ulu Roban. Given that the chances of obtaining an allocation from the Ministry of Rural Development are extremely slim, I appeal to the State Government to step forward and finance this requested project through the RM190 million that has been allocated in this budget. Apart from that, the people of Ulu Roban have also asked the YB ADUN for Krian, who is also the Member of Parliament for Saratok, to lobby for an allocation from the Ministry of Rural Development.

Rural Electricity Supply

Mr Speaker, Kabong town and the surrounding areas frequently experience "blackouts", which disrupt their daily lives. At present, SESCO has implemented a 33 kV line from Roban to Kabong to overcome this problem. The project should have been completed by the end of October. SESCO must monitor the project so that it does not suffer delays.

Apart from that, applications for electricity connections to houses under the RES are still heavily backlogged. Here I would like to recommend that State Government allocations be given and used for this purpose so that the problems of the poor in rural areas can obtain the same facilities enjoyed by people in the cities. It is very important for the people to have electricity supply if we want to develop the digital economy.

This will enable rural people to participate fully in seizing the opportunities offered by the digital economy.

Mr Speaker, we warmly welcome the Government's policy whereby every baby of Sarawakian citizens born from next year will receive an incentive of RM1,000.00, paid only once. The RM40 million allocated for this purpose cannot be withdrawn until the baby reaches the age of 18, and the money can then be used to further education and as capital for their career.

What has greatly pleased the people about this budget is the sum of RM1.105 billion allocated for infrastructure projects such as roads, bridges and jetties, which will improve the "connectivity" of the people in the Kabong district. They hope that Pekan Kabong and Kampung Paloh, as well as Batang Maro, which are separated by the Krian River mouth, can be connected by a bridge.

However, building a bridge takes time, so the people hope that a ferry service will be provided as an initial step towards realising that aspiration.

Agriculture and Fisheries Sector

Mr Speaker, the majority of the Kabong population are farmers and fishermen. In terms of agriculture, most residents in Kabong are engaged in planting oil palm on a "small holding" basis. There is still a lot of vacant land that lies idle.

It is hoped that the State Agriculture Department will go to the ground to provide explanations about the types of crops that they can venture into, and that they will also be given subsidies.

As for sea and river fishermen, they too must be exposed to fish rearing in cages and ponds. I would also like to request that the State Agriculture Department look into similar programmes and projects to help rural residents improve their economy.

Mr Speaker, to strengthen the tourism sector, we need good infrastructure such as comfortable accommodation, attractive places and effective marketing. I propose that allocations be given to upgrade Pantai Tanjung Kembang Kabong, which successfully hosted the Kabong Kite Festival 2018 in March, in which 10 foreign countries took part alongside the participation of five states in Malaysia. Therefore, we also request an allocation from the Sarawak Ministry of Tourism to organise the Kabong Kite Festival in 2019.

Pantai Alit is a location with potential to be developed as a tourist centre because it has many attractions that can captivate tourists. Unfortunately, its beach is suffering severe erosion due to strong currents from the Bubus River. To avoid continuous erosion and for it to become worse, one of the solutions is to "divert" the mouth of the Bubus River. It is hoped that the relevant agency can carry out a study on this matter.

Mr Speaker, I would also like to touch on the social ills in my constituency. Drug abuse and alcohol drinking have reached an alarming level. The enforcement agencies responsible should be more active and act more seriously so that these social ills can be controlled.

Mr SpeakerEN

Honourable Member for Kabong, your time is up.

Honourable Encik Mohd. Chee Bin Kadir: Mr Speaker, Kabong is located on the coastal area together with several other State Assembly constituencies and is far behind in terms of development. In order to plan, coordinate and accelerate the development of the coastal area, all the honourable members who represent those areas have agreed with the proposal of the Honourable Member for Daro that a Coastal Area Development Authority, or (CADA), be established. We hope that the Government will give positive consideration to the establishment of this CADA.

Finally, I would like to record my highest appreciation to the YAB Chief Minister for having allocated RM72 million for the Sarawak Rural Poor House Improvement Programme. This will bring great benefit to the people. With this, I respectfully move to support.

Thank you.

Mr SpeakerEN

The Honourable Member for Pelagus.

Thank you very much Tuan Speaker for giving me the privilege and honour to participate in debating the State Budget presented by the Right Honourable Chief Minister and The Minister of Finance, Minister of Economic Planning and Minister of Urban Development and Natural Resources on the 5th November 2018.

First and foremost, I wish to congratulate and give thanks to our Right Honourable Chief Minister for the budget of RM11.914 billion for the year 2019 which is the biggest in history of Sarawak in fact this time round our DUN sitting has significantly created two historical event:-

i. The formation of State Assembly Consultative Committee in particular, pertaining to Malaysia Agreement 1963; and

ii. The highest ever budget RM11.914 billion budget for 2019.

With this opportunity, Tuan Speaker, I also wish to congratulate our Right Honourable Chief Minister Yang Amat Berhormat Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari Bin Tun Abang Haji Openg for being conferred The Honorary Doctorate in Economic Development by University Malaysia, Sarawak (UNIMAS) recently.

Tuan Speaker, I fully support the State budget presented by The Right Honourable Chief Minister because this budget is development based and rural-focused budget, which is what we in Sarawak need. This also proves that our State Government is committed in its efforts to narrow the gap between rural and urban areas in the state.

Ever since taking over the helm of the State Government, our Right Honourable Chief Minister has always been untiringly and consistently sourcing for new and additional revenue stream for our state so that we do not entirely depend on the Federal Government funding.

If we compare the 2019 Federal Government budget which was tabled in Parliament on 2nd November 2018 shows that Sarawak is not treated fairly as an equal partner in the Federation of Malaysia. Out of RM280 billion, Sarawak only gets RM4 billion whereas the huge amount of RM271 billion is allocated to Malaya.

In Prime Minister speech during Malaysia Day Celebration in Kota Kinabalu on 16th September 2018, the Prime Minister pledged to restore the lost rights of Sarawak and Sabah under Malaysia Agreement 1963. Obviously from the budget allocation, the Prime Minister does not walk the talk.

Tuan Speaker, for Sarawak to move forward, our Right Honourable Chief Minister has initiated plans and strategies to generate revenue stream in order for our State to be financially independent. Few revenue streams have been created and established by him.

1. Taking over of Bakun Hydro Electric Dam from Federal Government;

2. Formation of Petroleum Sarawak Berhad (PETROS);

3. Increase the Sarawak Government share in LNG 3 Train 9 in Bintulu;

4. To invest in a Joint Venture (JV) Methanol Plant Project which is to be implemented in Sarawak Corridor of Renewable Energy (SCORE) in Bintulu. (Refer to MoU Petronas and Yayasan Hartanah Bumiputera Sarawak (YHBS);

5. Existing investment in Bintulu Port Sdn Bhd – State of Sarawak as main shareholder. with the share of 39.7% (Year 2017). Tuan Speaker, I suggest that Sarawak should take back Bintulu Port Authority (BPA). This is a strategic asset and I hope that the Sarawak Government could negotiate with the Federal Government to take back Bintulu Port Authority (BPA). If we can take back Bakun why can’t we take back Bintulu Port Authority; and

6. The latest revenue stream for our State Government to impose the 5% State sales tax 2019 on the petroleum products. All the above are the initiatives by our Honourable Chief Minister which does not include non-tax revenue totaling RM125.145 billion. I am very confident that we can achieve the status of high income State by the year 2030.

Tuan Speaker, Sarawak should not compromise and fall to the Federal’s crocodile tears, any more quoting the statement by Yang Berhormat Datuk Seri Azmin Ali, the Federal Minister of Economic Planning, in a National Daily published on 7th November 2018,

according to Datuk Seri Azmin, any increase in tax would have an impact on production of petroleum products in Sarawak and those who are invested in Sarawak.

Did the Federal leaders ever care about Sarawak’s dilemma of being short changed over the years?

Thus, the State should go ahead, with respect to the State’s plan to implement the sales tax, for the relevant petroleum products.

The implementation will not affect the market, however, it will only reduce the profit margin of Petronas. Since 1974, PETRONAS has been enjoying the benefits of the dividend and the petroleum product and tax by itself.

Tuan Speaker, PDA74 has been established for 44 years, thus, It is timely for Sarawak to exercise its rights and furthermore Petronas by now, also, has fully recovered its investment in the State.

Thus, it is about time for Sarawak to think of the State’s interest first instead of giving more priority to others.

Also, the petroleum tax collection from Sarawak, should be returned rightfully to the State. The failure of the Federal Government to adhere to the MA63 requirement has prompted the State to make the drastic moved to implement the sales tax for the petroleum products, which also, has been overdue for so long.

Furthermore, the unconstitutional action by the Federal to establish the PDA74 has inevitably caused a major consequential impact to Sarawak of which it has made the State, having to content with only 5% royalty instead of benefitting more from its oil and gas resources.

Tuan Speaker, politic is so dynamic, and so too are the rakyat’s political choice. Thus, at times, it’s worth, to sit-back, take a step backward, with the view, to analyse and to identify the potential areas that needs to be re-engineered, with the view to strengthen GPS’ outlook, to ensure it will relevant in the eyes of the public.

Thus, it is imperative for the GPS Government to re-look at various key positions in the GLC as well. A duration or term office must always be adhered to, and duly enforced, to ensure that any person holding office as Chairman of GLC, or the likes, should not over stayed his tenure, and should cease to hold office, after his or her term expires or lapsed.

If a person holding a higher level position, automates his or her to assume the respective positions in various GLC, it is only practical that the law or ordinance (if any) to governs to be revisit, or perhaps revised, to ensure that transparency and corporate governance is adhere to and to avoid over burden to a person with multiple workloads and responsibilities.

As such, in my humble opinion, a person may be allowed to ensure, assume, not only not more than two positions as Board Chairman or Director. Such arrangement would also open up opportunities for the others to hold such positions as well.

In terms of the Civil Service, Tuan Speaker, the glaring imbalance representation between races in the organizational set up should be re-look and must not bee seen as to be dominated by any particular race. Example, Yayasan Sarawak, PELITA, SEDC, etc.

If the make up of Civil Service and GLC are seen to be biased, distorted, and is not representative in terms of race, gender, age, they may certainly affect the reputation of the Civil Service, on GLC as a whole.

The point is, this is not about entitlement but more about good governance and good public policy. This is my humble view and also the voice of our Dayak people outside there, Tuan Speaker. The above issues also have been highlighted during our Iban Symposium on the of 26th and 27th of October 2018 that took place in Bintulu. I have to voice this out because we don’t want to be like what has been said by Arwah Tok Nan “ada mata – buta, ada telinga – tuli, ada mulut – bisu”. I hope we will see it positively and constructively.

Tuan Speaker, on behalf of my constituency, I wish to convey my utmost appreciation and give thanks to our Honourable Chief Minister for approving the substantial allocation for RM1.5 billion for infrastructure and water supply projects for Upper Rajang Development Agency (URDA), of which my constituency, Pelagus is within the URDA area.

Now, I want to touch on issues in my constituency, Tuan Speaker. Maybe the time, I hope the time is enough for me.

Road Connectivity

Listed below are following roads which my constituency need to be constructed. A long you know, quite a long road from Bintulu that is Sangan, Tatau to Anap Nanga Merit and Kapit which was which is under RECODA. It was tendered in 2010 but after that there is no news about it. And I hope the current State Government and the Federal Government will look into it.

Road from Rumah Tang Nanga Sungai Dap passing seven longhouses and one primary school (SK Nanga Sama) to Rumah Ngelai, Nanga Danau Merit Batang Rajang about 20 Kilometer.

To Upgrade Timber Road

Upgrade Jalan Batu Arang to Rumah Sekudan Sungai Pelagus. From Jalan Batu Arang to Rumah Majo Sungai Iran Pelagus. From timber main road to Rumah Jugah, Rumah Sanggau and Rumah Johnny Nyengat Ulu Sungai Sut.

Water Supply

For water supply Tuan Speaker, I understand that we have budgeted for that, but I like to request for water pipeline supply treated water from Kapit Water Treatment Plant to houses along Jalan Kapit-Melekun-Nanga Mujong Road. Treated water supply also we need to have a line playing have to lay the pipeline from Kapit Water Treatment Plant to all longhouses along Jalan Antaroh.

Agriculture

On Agriculture Tuan Speaker, I urge the Ministry of Modernisation of Agriculture and Rural Economy to provide the fund to set up the proposed Agriculture Integrated Training Center at Nanga Mujong in Kapit and I want to know the status of the site and its size. I request for Federal Agriculture Marketing Authority (FAMA) to set up agriculture products collection center in Kapit.

Tourism

Tuan Speaker, to attract the people to the rural area. Now the proposed road and bridge over to Pelagus Resort under URDA has been approved for RM150 million. I urge the Ministry of Tourism to allocate fund to review the abandoned Pelagus Resort.

As such, I like to take this opportunity to propose to the Government to revive this resort by tendering it out to private sector or any other way which the Government feels suitable and effective to run and manage the Pelagus Resort.

Education

The site 20 acres along Kapit-Sibu road to build a Community College in Kapit Division has been approved by State Planning Authority and I urge the Government to provide the fund to build the college. This college is urgently needed by the community in Kapit so that we can provide skill training to meet manpower need by the industries.

Iban Language Tuan Speaker, teachers. We are already know that we are facing the shortage of teachers especially Iban Language teachers. I urge the Ministry of Education to look into the issue urgently and as a priority.

Petrol Supply in Kapit Town

Tuan Speaker, motorists in Kapit are increasingly frustrated over the constant shortage of petrol as there are only two petrol stations in Kapit town. I urge the Ministry that responsible for this and Kementerian Perdagangan Dalam Negeri dan Hal Ehwal Pengguna to look into this issue seriously and urgently.

NCR Land

Now I talk about NCR Land, Tuan Speaker. Previous Federal Government had allocated fund in the Budget for the perimeter survey. Thank you for supporting this Honorable Member for Bukit Goram. But this new Government had not provided any allocation in the new Budget. I hereby request the State Government to provide the sufficient fund required for the perimeter survey or our NCR with considerations to the new amended Land Code during last Dewan Undangan Negeri Sitting, more fund should be allocated so that the survey for Native Territorial Domain (NTD) can commence at the area concerned after the perimeter survey of NCR has been completed.

I also urge the Land and Survey Department to expedite the issuance of land titles for those land which had been surveyed in the 80’s until now. Some of and many more land titles not being issued in Kapit.

Medical and Health Finances

I would like to suggest for a new clinic to be built at Nanga Mekey which is located between Kapit town and Ng. Merit Batang Rajang. This is new to the distance between Kapit town and Ng. Merit is very far, about two to three hours by express boat.

Bukit Mabong District – Tunoh Township

Tuan Speaker, the last one regarding the Tunoh Township. Tunoh is the administrative center for Bukit Mabong District. The District is now administered temporarily from Kapit Resident Office and only accessible by timber road. I want to know what is the status of Tunoh Administrative Center and the development plan for Tunoh Township.

Tuan Speaker, to conclude, I fully support our 2019 State Budget. May I take this opportunity to wish all Christians a blessed Christmas and everyone Happy New Year 2019.

Thank you.

Mr Speaker

The Honourable Member for Serembu.

Encik Miro Anak SimuhPBB · GPSSerembu

Terima kasih Yang Berhormat Tuan Speaker. Izinkan saya memukadimahkan perbahasan saya dengan serangkap pantun;

Anak Dara Mencari Teruna, Teruna Dicari Serata Negeri, Ketua Menteri Bijak Laksana, Belanjawan Bistari Pemacu Negeri.

Personally and on behalf of the people of my Constituency, let me first thank our YAB Chief Minister for tabling a much awaited budget for the year 2019. For the first time in the history of our beloved Sarawak, the two digit budget, amounting of RM11.914 billion, was tabled with six key strategies aimed at generating a higher economic growth and off course the development biased Budget, especially for the rural area. In this Budget, there is two main questions that might been arised. Why do we need to spend more? Why do we focus on rural area?

As the World Economic Situation and Prospects 2018 demonstrate, current macroeconomic conditions offer policymakers greater scope to address some of the deep-rooted systemic issues and short-term thinking that continue to hamper progress towards the Sustainable Development Goals – this was said by Antonio Guterres, the United Nation Secretary General.

It shows that the uncertainty of the world economic affect the judgement of policymakers and this does give impact to our State to be more prudent in spending for next year budget, even though it comes with the biggest amount in the history. And here come the question of why do we need to spend more?

To spur the domestic economic activities, the Sarawak Government need to activate more sector to be active and contribute to the spinning of economic equilibrium. The agriculture sector, real estate sector, education sector etc., need an injector to generate more activities throughout the year. With the unfriendly budget from the Federal Government towards our State, we cannot rely more on the other side to generate the economic growth in our State. We need to stand firm on our own and spending more it’s doesn’t mean we waste the State’s money but mainly to generate the economic growth in this beloved State. Why do we focus on rural area?

I can say here that 70% of total Sarawak area is still consider as rural area. Thus, the development biased Budget focusing on the rural area portray the struggle of the State Government to close the gap between the rural and the urban area. Focusing to develop the rural area transpired the inspiration of the rural folks that this Government is people centric Government and walk the talk Government with less rhetoric statement.

Some of the rural areas are still fighting to get basic infrastructure, such as gravel road and gravity feed water. And all these concern lay on the shoulder of our State Government. And where is the 30% promised by certain of our Honorable Member in this House for the 2019 Federal Budget. Or it just a hot air or slip of tongue and come forward with the statement to seek for apology. Let the people judge them. And stop dwelling with the

past. We are here to move forward and this State budget show the reality of moving forward with more certain future for all Sarawakian.

Tuan Speaker, and now allow me to focus back on the need of my Constituency.

The Upgrading of Bau - Kuching Road

I’ve been debating this issue for every sitting and humbly seek for stern action from the State Government toward the project of upgrading this single carriage way to double carriage way road. In 2018 alone and as at today, this road has recorded six fatalities where most of them died on the spot due to accident. I’ve been told by the Divisional Engineer that the proposal and cost finding for the upgrading of this road has been submitted to Sarawak JKR HQ for further action. The estimated cost is RM100 million. I pray hard for such budget will be approved by our State Government.

Development of Agriculture Road

The development of agriculture road is catalyst to open up new agriculture area especially in my Constituency. With the distance of only 30 minutes’ drive to Kuching City, Serembu Constituency and Bau District particularly can be transformed into another agriculture hub for the State. With vast areas and fertile soil, added to another advantages of this area. With that, I proposed to the Ministry of Modernisation of Agriculture, Native Land and Regional Development the list of agriculture road in my constituency as details;

i. Agriculture Road at Kampung Kopit, Bau;

ii. Agriculture Road at Kampung Pisa and Bijongon, Bau;

iii. Agriculture Road at Kampung Kandis Baru, Bau; and

iv. Agriculture Road at Kampung Seromah, Bau.

I believe, with the development of this agriculture road it will be able to open up at least about 100 acres of new agriculture land.

Dilapidated School and the Need to Have A New Secondary School in Bau District

With the amount of RM81.7 million that was allocated for the dilapidated school throughout the State, I urged the State Government to put SK Serembu in the list of school that are going to be rebuilt or upgraded. This school was too crowded with 235 students with only six classrooms. This school served six kampungs and one housing estate. With the high hope from the teachers and parents of this school, we hope this school can be rebuilt from the current six classrooms to 12 classrooms.

Currently Bau District have four secondary schools that cater 64,000 populations. Those secondary school are, SMK Bau with 1,800 students, SMK Lake with 1,800 students, SMK Paku with 1,600 students and newly operated SMK Singai with 400 students. All those secondary school was built to cater between 800 to 1,000 students, and based on the current conditions, most the school are overcrowded with students. With the rapidly increasing of population in Bau District, we deeply need another secondary school to meet the ongoing demand of population.

Development of Tourism Product

Within the vicinity of about 35 kilometres from Kuching City, Serembu Constituency offered at least six stunning tourism product that attract domestic and international tourist. The Siniawan Heritage Town, The Buddhist Village, Paku Hot Spring, Brooke Heritage Site, the Majestic Fairy Cave and Krokong/Tringgus nature trail, name a few is the major tourist attraction in my area. Thus, I proposed to the Ministry concerned to upgrade the Siniawan Heritage Town façade and lighting system that cost around RM500,000.00. This little town is home to the famous Siniawan Country and Western Music Festival and this year we managed to record about 17,000 people visited Siniawan in five days festival.

I was told that the development of tourism project at Mount Serembu and Brooke Heritage site was put on hold by the Federal Government and we can not see any further action from the Federal Government to proceed with it. Thus, I humbly urged the State Government to take over the project that amounting RM1.6 million as this project is one of the many promised project by the previous Federal Government during the last 11th State Election. With the completion of this project, we can project the big number of tourist to come and visit the site.

Affordable Housing and Kampung Extension

The demand for affordable housing was raising rapidly, especially in the suburban area. In Serembu Constituency and Bau District particularly, the rapidly increasing of population and the migration of urban folks to suburban area created a high demand on affordable house. I urged the Ministry of Local Government and Housing to consider develop a few State land especially in Paku area for low and medium cost housing to meet the critical demand from the local population.

Again due the changes of migration pattern that we can see now, a lot of urban people started to look for land at kampung area to build their house. Most of the individual land had not in proper basic infrastructures, such as road, water and electricity supply. Thus, we request to the State Government to allocate funding to open up new area as kampung extension with all the needed basic infrastructure and amenities.

NCR Perimeter Survey and Issuance of Title

The NCR perimeter survey and issuance of NCR land title is a pertinent issue that has been played around for their own reason. The State Government with the full support from our august House has done a tremendous effort to put NCR land matter as a State priority issue. We should thank our State Government under the leadership of our YAB Chief Minister for the Budget allocated to continue with the perimeter survey throughout the State. Without any assistance from the Federal Government next year, I am assured that, it would not hamper the continuation of the State effort.

I do hope that the State Government will continue the perimeter survey especially in Bidayuh area under the Dayak Bidayuh National Association (DBNA) initiative. This effort by DBNA has shown that it can work within the Bidayuh community and we want it to be more inclusive to all Bidayuh area in Serian, Padawan, Penrissen, Bau and Lundu. With the funding support from the State Government, I am sure that there will be more areas that can be covered under this initiative. This initiative too will ease the task of Land & Survey Department to expedite the survey and the issuance of the title.

Tuan Speaker, before I conclude my debate, allow me to express my vote of thanks to YAB Chief Minister and his Cabinet Members for the tremendous effort to safeguard

Sarawak, a place like no others, from any harm. My vote of thanks also to those who tirelessly make Sarawak like what we have today. Without the sacrifices from the previous leaders, we might not see what Sarawak is now. This is the kind of commitment that those before us made, so that we can have a better life today and a strong foundation for our future generation. Together we can ensure that Sarawak will rise and shine in the eyes of the world.

Happy holiday in advance, Merry Christmas to all our fellow Christian friends and Happy New Year 2019. Tuan Speaker, I begged to support.

Mr SpeakerEN

Honourable Member for Tasik Biru.

Dato Henry Harry Anak JinepPDP · GPSTasik Biru

Thank you, Tuan Speaker. Thank you for this opportunity to participate in the debate on the budget proposal 2019 tabled at this august House on 5th November 2018 by the Right Honourable Chief Minister cum Minister of Finance. I would like to thank the Right Honourable Chief Minister for presenting a budget that is Development Biased and Rural focus to stimulate a higher level of economic activities and economic progress for Sarawak particularly for rural areas. I am sure that the rural population will cherish this moment because a sum of RM6.049 billion has been provided for the development of the rural areas to ensure that the rural areas will continue to enjoy more development thus narrowing the development gap between the urban and rural areas of Sarawak.

Tuan Speaker, the 2019 Federal Government budget allocated a measly sum of RM4 billion to Sarawak out of RM54 billion development budget, much, much below the 30% promised by Pakatan Harapan. Sarawak and Sabah being equal partners in the Federation of Malaysia should get at least RM18 billion each of the development budget. These has resulted in Sarawak being forced to table a development biased and rural focused budget to offset the shortfalls and to show that Sarawak is capable to be independent of the Federal Government. If you want to swim, you must be forced into the water. That is the situation that has forced us to stand on our own, to be independent and to be treated as equal.

The Sarawak Budget 2019 tabled by the Right Honourable Chief Minister wholly funded by our State fund derived from revenue collected by the State Government is the testament that Sarawak is able to be fiscally independent, not having to rely entirely on the Federal Government for funding. This is a true example of returning the profit derived from the motherland back to Sarawakian. No more are we beggars in our own country. Sarawak is indeed a blessed State. We do not have to stick our hands into the reserve pot for the State Budget. The State Budget 2019 is indeed a record budget which is proof of the Sarawak Government’s commitment to its Rakyat.

Pan Borneo Project

We are made to understand that there is a cut of RM4 billion from the original cost of Pan Borneo Project. Can the Honourable Member of Ba’kelalan who is also the Minister of Works to enlighten this august House on this and if it is true, will there be a compromise on the original scope of works? Again, if it is true, then in actual fiscal sense, Sarawak is actually getting zero budget from Federal Government for 2019. I hope the Honourable Member of Be’kalalan have to clarify on this.

Malaysia Agreement 1963 (MA63)

Tuan Speaker, at this juncture, I would like to dwell on the subject of Malaysia Agreement 1963 or MA63, focusing particularly on the relevant provisions that unequivocally guarantee the rights of Sarawak as signatory together with Sabah, Malaya and the United

Kingdom, to the Malaysia Agreement. It is my fervent hope and the hope of all well-meaning Sarawakians in this august House and those out there that the legitimate rights of Sarawak as enshrined in the MA63 and provided for under the Inter-Governmental Committee of IGC Report are reinstated without further delay. The need for devolution of power and the Sarawak’s autonomy is now stronger than ever. I wish to quote the words of the late Tok Nan during the first Meeting of the first session of the 18th DUN Sitting, page 59, hansard dated 15th June 2016; “The State Government has now received a strong electoral mandate from the people of Sarawak to take all the necessary measures to safeguard the State’s rights and interests as one of the founding partners of the Federation after it had attained self-Government and upon being granted independence by Britain under the terms of the Malaysia Agreement. Thus Sarawak can never be equated like any State in Peninsular Malaysia. The discussions with the Federal Government is not to seek for powers which constitutionally belong to the Federal Government but to reclaim those State powers and rights that have been wrongly encroached upon by the Federal Authorities based upon the principle of Render to Caesar what is Caesar’s and to God what is God’s”.

Tuan Speaker, today, the MA63 has become a contentious issue, causing restlessness and anxiety among Sarawakians and Sabahans, irrespective of ethnic, religious or political belonging. Many are asking, why does it take so long for the Federal Government to review MA63 especially in regard to those terms that of interest to Sarawak and Sabah. I have lost count of the number of committee and sub-committee meetings that Putrajaya has hosted to resolve the MA63 issue. Yet, nothing concrete has emerged.

We cannot allow ourselves to be left in limbo anymore. We have to reinvent our approach to resolve the issue and to galvanise our strength of purpose. We have to put our best foot forward and make a strong collective representation of our claims on our legitimate rights under MA63 to the Federal Government. This has to be done fast, in an organized manner and within a specified time frame, so that we will be able to see the light at the end of the tunnel and, better still, know precisely the day, the week, the month and the year when these rights of ours will be reinstated. Further delay and procrastination by Putrajaya, for whatever reasons, can no longer be tolerated.

Tuan Speaker, in this regard, I fully support the Ministerial Motion tabled earlier in this august House and this time I support it for the second time for the setting up of a select committee that will provide a collective avenue for the comprehensive review of the terms governing our rights under MA63 and the concrete plan of action for the devolution of power and reinstatement of our rights. The select committee or our Consultative Committee provides the strength of legitimacy and collectivity to the representation that Sarawak makes to the Federal Government on matters pertaining to MA63. We are left with little choice but to reinvent the wheel and set it in motion so that we can be certain of achieving our objectives. The wheel is the Consultative Committee on the Devolution of Power.

It is important for any interested party to set MA63 in the right context, historically and legally, at the outset, because any discussion and critical review pertaining to the terms contained therein must be predicated on this ground and pursued within the given legal and historical framework.

Tuan Speaker, MA63 is an international agreement and was registered in the United Nations on 21st September 1970. Verification with the United Nation’s Headquarters in New York can easily reveal the registration number of this document. And since MA63 is an international agreement that comes under the custodial ambit of the United Nations, the Malaysia Parliament simply has no authority to amend the terms of MA63. It is as simple as that. Let it be known that no amount of political negotiations of legislative ordering, even at the highest level of Government in the country, can amend the terms of MA63. The letter and spirit remain unequivocal and irrevocable.

Although the Federal Constitution may have been amended a few hundred times over the past six decades, the terms enshrined in the MA63 have remained unchanged since the day it was signed in 1963. MA63 is beyond Malaysia Parliament’s jurisdiction to amend. The rights and interests of Sarawak and Sabah remain untouched.

Issues of N.2 Tasik Biru

Tuan Speaker, now I would like to touch on issues affecting my constituency N.2 Tasik Biru. It has been two years since I have been elected by the rakyat of Tasik Biru to represent them in this august House and I do not want to let my constituents down. As with other YBs in this house, we were elected because they expect us to deliver, for us to bring issues and grievances to the attention of the Government.

I am thankful to the State Government for its approval for various projects in Dewan Undangan Negeri Tasik Biru and Bau District and am looking forward to more allocation being channelled to Tasik Biru and Bau District in general, to enable the continuity of vibrant development in Tasik Biru and Bau.

For the past two years, we have invited and received Ministers of the State Government, including our Right Honourable Chief Minister for a walkabout in Tasik Biru. The walkabouts have resulted in projects for Tasik Biru and are now in various stages of implementation. These projects are namely: -

i. Tondong-Sebuku Concrete Bridge - RM10.7 million. To be tendered by middle of November; ii. Kampung Buso-Musi Bridge - RM5 million. Tender closed on 7th November; iii. Bau District Office Complex - RM7.5 million. To be tendered by middle of November; iv. Bau Wet Market (Non Halal) - RM2 million. Site have been approved; and v. Bau Water Treatment Plant - RM20 million which is also in tendering the stage.

We have also progressed in our land matters whereby three more kampungs that is Kampung Tanjong Poting, Kampung Daun and Kampung Senibung in DUN Tasik Biru will be receiving their individual land titles as early as January 2019.

With all these progress, we must be grateful to the implementing agencies such as SPA, SPU, SIMU, Land and Survey, JKR, JBALB, Pejabat Residen, Pejabat Daerah dan lain-lain jabatan for working tirelessly in getting these projects implemented.

Tuan Speaker, Tasik Biru does not have beaches like Sematan, Lundu, but we have nature attractions such as caves, rivers and mountains such as Bung Jagoi, Bung Orad, Mount Singai and of course the infamous Tasik Biru and also the Blue Lake itself. Through the magic of social media, more and more visitors are coming and boosting the local economy. Various event organisers are making Bau District as the preferred choice for their events such as the recently held Jagoi Heritage Trail Run 2018 at Bung Jagoi, Sarawak Adventure Challenge: The Sacred Mountain at Singai.

We see this as a sign of positive development for tourism in Bau. Anticipating the needs for the visitors, more public facilities ought to be considered such as Rest Areas, Visitor’s Information Centres and more certified Local Tour Guides.

With the advent of Pan Borneo Highway, the people of Tasik Biru would not want to be left out. Various plans to boost the tourism sector for Tasik Biru and Bau have been

approved such as the Bau Gold Mine Park and Museum, upgrading of Wind Cave and Fairy Cave Natural Reserve, which we hope would be executed soon.

As it is our mission to transform Tasik Biru from a rural to a Semi-Urban District, we are in need of more and better public facilities and infrastructures including faster and wider telecommunications coverage to create the right business environment in order to entice more business entities to invest in Tasik Biru and Bau District.

On this note, I would like to touch on a rampant social issue in my constituency. Drug abuse – penyalahgunaan dadah of late, the problem has been escalating. I have to applaud the relevant Government agencies that is The Royal Malaysian Police (IPD Bau) for their diligence in carrying out the never ending task to curb this social menace. It is sad to say that our rural youths are easily persuaded and succumb to the pleasures of such illegal substances. Therefore, I would like to urge the Government through its Ministries and various agencies to develop and execute more stringent measures to combat and prevent the drug abuse among our youths.

Sarawak Civil Service

Tuan Speaker, before I conclude my speech, I would like to touch briefly on the Sarawak Civil Service.

The Sarawak Civil Service have performed relatively well and delivered its services to every corner of Sarawak despite the immense geographical disadvantage. However, we must not be complacent neither must we be in denial that there are more grounds the civil service could cover and improve on.

Apart from the product and the service, the structure of the civil service warrants and review to reflect a fair representation of well meaning Sarawakian irrespective of ethnic and religious background. We should be united in championing the cause of reclaiming our rights under MA63. We must remain equally united in forging a civil service that belongs to all Sarawakians.

Despite the challenging times we now face, I feel that credit must be given where it is due. In this regard, I would like to propose that the Sarawak Civil Servants be given a special one off incentive payment in December 2018 amounting to RM2,000.00 each, irrespective of grades. This incentive payment will hopefully lessen the burden of parents whose children will be attending schools, colleges and universities in 2019. Mungkin kalau ada lebih sikit boleh pergi Serikin di Tasik Biru, kalau tidak pun, pergi Tasik Biru lah, belanja lebih sikit.

Tuan Speaker, in conclusion, I would like to wish all my Christian friends, Merry Christmas and to all Sarawakians a Happy New Year. I hereby support the State Supply (2019), Bill 2018. Thank you, Tuan Speaker.

Mr Speaker

Honourable Member for Palawan.

Thank you, Tuan Speaker for giving me the opportunity to debate on the Budget of Sarawak 2019.

Malaysia National Budget 2019

Tuan Speaker, after the BN’s defeat in GE14, Sarawak Barisan Nasional was dismantled and the old same Barisan Nasional leaders formed the GPS. They knew that if

they don’t rebrand then the next state election would be the day they become the opposition in Sarawak.

Tuan Speaker, the GPS leaders in Sarawak has hailed Dato’ Seri Najib as the “best PM for Sarawak” and has before 509 support everything that the BN threw at Sarawak including the infamous 1 Malaysia Development Berhad (1MDB). One of the Sarawak Barisan Nasional component parties had actually received from the money stolen from the 1MDB.

With the unwavering support of the then State BN, Najib has created the worst financial scandal in the world through 1MDB. The country was almost crippled by the national debt accumulated under the leadership of Najib. Today the country debt has exceeded RM1.065 trillion that is nearly RM350 billion higher than that officially declared by the BN Government.

The Pakatan Harapan Government may be liable to pay up to RM43.9 billion to settle the 1MDB’s debts. Furthermore, Income Tax refunds and GST refunds payable stood at RM16 billion and RM19.4 billion respectively. These refunds belong to the tax payers of Malaysia including Sarawakian but the Barisan Nasional Government misused them and now the PH Government has to come up with RM37 billion to refund the tax payers in 2019 and many of them are Sarawakian as well.

Tuan Speaker, the Pakatan Harapan Federal Government will table a Fiscal Responsibility Act by 2021 to avoid reckless spending and also a new Procurement Act in 2019 next year to govern procurement processes to ensure transparency and accountability and competition while punishing abuse of power, negligence and corruption.

Tuan Speaker, the previous Government relied heavily on less transparent Government guaranteed borrowings and lease financing programmes known as Private Partnership projects and the value of the Government guaranteed borrowings ballooned from RM69.2 billion in 2008 to RM238 billion in 2017.

Tuan Speaker, with so much debt inherited from the Barisan Nasional, the Pakatan Harapan Government has to save the country first and according to the Finance Minister Lim Guan Eng, it will take at least 3 years for the country’s financial health to be restored.

To address the issues of the challenging financial health of the country, the Federal Government adopted a “zero-based budgeting” exercise for the national budget to improve efficiency, effectiveness and higher cost-savings.

I support the Finance Minister’s strategy of Strengthening Fiscal Administration by firstly, ensuring spending is justified by objectives rather than the previous year’s budget; secondly, review alternative scenarios to achieve the same objectives; and thirdly, all discretionary spending is planned from zero.

Sarawak Budget 2019

Tuan Speaker, our Chief Minister announced “an extraordinary budget” of RM11.914 billion with the theme of “Development Biased and Rural Focus” which is indeed very catchy but lack details of how it would be carried out and lack the institutional reforms needed to manage such a huge budget.

Without promote financial transparency and accountability, the extraordinary budget is open to abuse, misappropriations, leakages and subject to corrupt practices.

Tuan Speaker, I had on the 29th October 2018 lodged a report at the MACC Sibu branch over the RM850 million Tanjung Manis water pipeline project which was given out in eight packages to eight companies without open tender. The State Government had actually raised the fund of RM1.06 billion through the Government bond and now the project is not in operational due to the problems with package one including not according to the specifications of the work agreement, while the other seven packages have been completed in 2016 but the overall testing and commissioning has yet to be carried out.

The chairman of the Sarawak PAC has been reported by the Borneo Post as saying that “public hearing over the failed project could only be held after getting the direction from the State Legislative Assembly.” He further stated that the AG report on the matter would be in the agenda of the current DUN sitting and it is not right to draw any conclusion on the AG Report until it has been deliberated in this DUN.

Tuan Speaker, where is the AG report? Our DUN supposed to be tabled in this House, according to the PAC Chairman. We haven’t seen it, I haven’t seen it.

I want the Chairman of the PAC to move a motion to discuss the matter so that the general public will not view DUN Sarawak as a mere rubber stamp of the administration.

Tuan Speaker, next year development expenditure of RM9.073 billion is only ten (10) times the Tanjung Manis water pipeline project and if a RM850 million project can turn out to be a white elephant then how can the GPS Government assure Sarawakians that the huge allocation for 2019 would benefit the rakyat instead of cronies?

Another project is the RM31 million music fountain which my colleague from Pending has spoken again this morning. Tuan Speaker, this majestic DUN Sarawak building was constructed at a cost of RM298 million and yet this music fountain cost more than 10% of this majestic DUN Sarawak building?

I actually took the time to check the music fountain out and found out that it only works three times daily with only a short 15 minutes each time. Is it worth RM31 million, Tuan Speaker? Imagine the construction cost of the Kuching Golden Anniversary Bridge was only RM35 million, Tuan Speaker.

Tuan Speaker, that is why we emphasize on the important of financial transparency and accountability which is lacking in the CM’s speech in tabling 2019 Sarawak Budget.

The biggest chunk of the RM9.073 billion development expenditure is allocated to rural development with RM6.049 billion is proposed. And out of the RM6.049 billion, RM2.35 billion is set aside for the implementation of the following projects.

RM1.535 billion for Walkabout projects, Tuan Speaker, I am lost. What is Walkabout projects? I don’t understand. I could not find in the dictionary what is the Walkabout projects.

RM500 million for RTP or Rural Transformation Projects which we all know each Yang Berhormat from the GPS including the MP from GPS gets RM5 million each. Tuan Speaker, this has been going on for two (2) to three (3) years since the late Tok Nan’s time and yet none of the Yang Berhormat has actually publish the actual projects and cost of each project. I do hope the Chief Minister would make it compulsory for all the ADUNS and Yang Berhormat to publish a detail account of where the money was spent.

RM 243 million for MRP projects which we all know each GPS YB gets RM1 million each but never accounted for the money spent.

Tuan Speaker, RM 72 million for the Program Penambahbaikan Rumah Miskin Sarawak and we also know each GPS Yang Berhormat get RM1 million, but would the GPS Government give a thorough report cards on this?

Surplus Budget for Sarawak

Tuan Speaker, I have some reservation whether this could turn out to be a surplus budget:

i. The whole budget hinges on the collection of ‘sales tax on petroleum products’.

ii. In his entire speech the CM didn’t mention a word about corruption or leakages but instead trying to sell the idea that the GPS is the saviour of Sarawak and used the phrase ‘self-determining’.

However, if for whatever reasons the 5% sales tax cannot be collected then we shall run into deficit of RM3.775 billion in 2019 which would be devastating to our State’s coffer.

55 Years of Neglect and Mismanagement

Our GPS lawmakers in this House forgot that Sarawak’s lack of development and the poor infrastructures did not happen overnight but was rather due to the chronic mismanagement of the BN Government which they were part of.

The neglects, the loss of the status and equal partner, the dirt-cheap sales of our petrol and natural gas right to Petronas and the world’s largest financial scandal in the name of 1MDB all happened with the consent of the parties within the GPS. Yet our CM and his cabinet had until GE14 steadfastly remained the strongest and the most loyal supporter of the BN.

Yes, Sarawakian will indeed ask, ‘without the change of Federal Government and the worry of losing power in the upcoming State Election would the GPS really comes to a reality check?

In 2018 Sarawak budget, the allocation for development expenditure was RM5,744 million. With so much allocation, can the GPS Government show us the report card of the projects they implemented? From 2017 to 2018, a total sum of RM9.3 billion has been transferred from the Consolidated Revenue Account, can the GPS show us where the money was spent and how many development projects had been completed and the number of people benefited from the billions spent?

Sales Tax as the Major Revenue Stream

Tuan Speaker, sales tax as the major revenue stream. I would like to highlight my following observation on the proposed sales tax as the major revenue stream although I whole heartedly support the State Government to seek for new revenue to develop the State. The RM11 billion budget hinges on the 5% sales tax on petroleum products which according to the CM will take effects on the 1st January 2019.

I have some reservation on the feasibility of the enforceability of the 5% sales tax on petroleum products bearing in mind that the current sales tax on lottery sales in Sarawak is based on the sales in Sarawak while the crude oil, natural gas and chemical based fertilizers the CM was talking about are exported item outside Sarawak and not sales made within Sarawak. To be able to impose sales tax on sales of lottery within Sarawak is different from

imposing export tax on crude oil and natural gas and other petroleum based products. Not forgetting that ownership of oil and gas has been sold to Petronas as per the PDA.

Has the GPS Government talked to all the stake holders like Petronas, Shell, ABF and others? How would the proposed sales tax be collected if the stake holders of oil and gas industry in Sarawak refused to the proposed sales tax? Are we going to, for example, Tuan Speaker close down all the operations of these stake holders if they refuse to cooperate? I can’t imagine the consequences if the GPS Government is to implement the said sales tax without first talking and getting the understanding and consensus among all the major stake holders.

Tuan Speaker, the oil and gas industry in Sarawak could be crippled by the Government’s Sale Tax on petroleum products which include crude oil, liquefied natural gas and all these. And how would the agricultural sector, the transportation sectors and even the ordinary folks be affected by the price hike that comes with the Sales Tax?

According to the Chief Minister, Sarawak revenue expected from the imposition of the Sales Tax is estimated to be at a sum of RM3.897 billion in 2019 and thus, he said he tabled a surplus budget of RM122 million.

Rabies

My colleague from Bukit Assek has spoken lengthy about this issue and I can’t help to mention that the fight against rabies has been lost due to the inability of the State Government to take fast and decisive actions since it first outbreak in July 2017.

Tuan Speaker, the old Dogs Licensing and Control By-laws was introduced in 1962 and it took the Government 56 years to come out with a new one to replace the old one and yet it has so many flaws and shortcomings.

Although the State Government introduced the new Dogs Licensing and Control By-laws recently, to be implemented on 1st December 2018, it lacks the mechanism to allow local councils to prevent and control of the stray dogs in the long run. Let me point out some of the shortcomings of the new By-laws:

i. The new By-laws did not have the penalty clause for the dog owners who refuse to apply licenses for their dogs;

ii. The new By-laws didn’t have the clause to prevent member of the public from obstructing the dog catchers to carry out their duties;

iii. The new By-laws did not mention the rights of local councils to outsource dog catching although all the local councils do not have sufficient manpower to do it; and

iv. The new By-laws have no provision for the control of cats although the cats have been found to carry the same rabies disease virus and this put the general public at risk not known to them.

I hope both the Chairman of the State Disaster Relief Management and the Minister for Local Government will look into the shortcomings before the new By-laws is introduced on the 1st December 2018.

Sibu

Tuan Speaker, since 2011, I have raised many issues about the developments of Sibu or rather the lack of them. Over the past 10 years, more than 10 years, now should be 15 years, there is no new road or link being built / constructed in Sibu and Sibu’s development has basically come to a standstill.

I have submitted a Sibu Outer Links’ proposal when the late Tok Nan was the Chief Minister in October 2015 and urged him to have it adopted into the 2016 Budget. The RM70 million proposal will ease the heavy traffic jam and solve the problem of the lack of connectivity among the densely populated residential and commercial areas in Sibu as well as pave the way to develop a low cost housing hub in Sibu.

I am totally disappointed that with a development budget on RM9.073 billion. Sibu with five State’s constituencies and two Parliamentary constituencies only get a small percentage, 1.1% to be exact, of the development budget. If the GPS lawmakers shout about unfair treatment of Sarawak by the Federal Government, then can’t they feel the pain and disappointment of Sibu’s folks, Tuan Speaker.

Although the CM has allocated RM102 million for the construction of roads in Sibu but all of them are not for the town folks and doesn’t address the need of the urban people at all.

Tuan Speaker, while we support a rural focus budget to narrow the disparity gap between the urban and the rural areas, we also cannot neglect the fact that 50% of the population live in the urban areas and the influx of rural folks will continue and thus the Government needs to address the infrastructures requirement of the urban areas as well.

Incentive for New Born

In my 2011 Budget debate speech, I made some remarks which are sadly still applicable today. In last year also, 2017 Budget debate, I raised the following issue:

i. Penang Government and Selangor Government are giving out assistance to help people struggling against rising cost of living although their budget is only RM1.3 billion and RM3.12 billion respectively;

ii. Did our CM give any thought to the students who are accepted into vocational schools or local university by giving aids to them like what the Penang Government does with RM300.00 for vocational students and RM1,000.00 for college students? How about the ‘senior citizens’ aid or healthcare services for families with household incomes of RM4,000.00 and below and RM300.00 in child care healthcare for mothers and with children below six? ;

iii. Penang also gives RM400.00 cash vouchers for fishermen along with free nets twice a year. How about Sarawak? and

iv. The Selangor Government has a heart for the poor by addressing cost of living and affordable healthcare into their Budget 2018. The ‘Skim Peduli Sihat’ or medical healthcare coverage to address the rising cost of living for the B40 income group, which cover approximately one million people. The Selangor Government announced a new program in its 2018 Budget, dubbed ‘Kasih Ibu Smart Selangor’ (KISS) which provides a monthly assistance of RM200.00 for food supplies to mothers whose families earned below RM2,000.00. How about Sarawak?

Tuan Speaker, our CM announced in his Budget Speech that finally the State Government will give a one-off incentive of RM1,000.00 to every new born child. However, it falls short of the help and assistance the other states in Penang and Selangor are doing.

With such a big Budget and strong financial position, Sarawak Government should do more to help our rakyat. The failure of the State Government to address the needs of the Sarawakian is most regretable.

Hydrogen Bus

Tuan Speaker, I express strong reservations towards the decision of our Chief Minister and the State Government in the preference of hydrogen buses over the electric buses in Kuching and question whether such initiatives were properly thought through and proper understanding of the industry was done before taking such a huge decision in embarking into this venture. Our Chief Minister has reportedly saying that he has confidence that hydrogen is the energy of the future and that there is a move worldwide to transform energy from fossil fuel to clean energy. While we all agree in the direction to move away from fossil fuel to clean energy, but hydrogen is firstly not an energy source, but an energy carrier, and production of hydrogen in its purest form is not clean itself.

Tuan Speaker, hydrogen produced around the world as mentioned is not clean. Electrolysis of water is expensive and slow. That is why I believe that the better direction to focus on building the field of Battery Electric Vehicle (BEV) or the common electric bus in comparison to the hydrogen Fuel Cell Vehicle (FCV). More and more research focus around the world has shifted their research and development to battery and capacitor technology as it is seen to me more sustainable, lower maintenance cost and have a longer lifespan.

The availability of electricity generated through our mega hydroelectric dams including the Bakun Dam makes it an even more conducive environment to develop BEW technology in Sarawak rather than hydrogen FCV buses.

Why not take advantage of what we have instead of venturing into something we don’t have and have no knowledge at all? We support the development of public transportation and in fact Sarawak DAP law makers in this House had moved Motions, spoke out passionately for the State Government to start a free bus services for the major cities and townships in Sarawak. But we are against any idea of wasting our tax payers’ money to indulge the fantasy of the leader to try out something which is not sensible or something that may cost our tax payers a fortune when there are better alternatives to choose from.

When asked by the media how much would a hydrogen bus cost, our Chief Minister plays Tai-qi and answered that it is not that expensive lah. This doesn’t sound good, Tuan Speaker, because we believe that each would cost us a fortune.

I urge our Chief Minister to choose the electric bus over the hydrogen bus. All risk that is taken to bring out State forward especially when it involves a significant amount of public funds, has to be properly understood and properly calculated. With that I conclude.

Thank you, Tuan Speaker.

Mr Speaker

Honourable Member for Ngemah

Thank you, Tuan Speaker, for giving me the opportunity to participate in the debate on the Supply Bill (2019), 2018 which was delivered by the Right Honourable Chief Minister of Sarawak on 5th November 2018 in this august

House. The year 2019 is the fourth fiscal year of 11th Malaysian Plan. I wish to express my sincere thanks to the Right Honourable Chief Minister of Sarawak for presenting a very comprehensive budget for the year 2019 for the State of Sarawak despite facing resilient economic growth in the current year.

If we look and compare the total amount of State Budget presented from the past four years, the State Budget in 2019 is the highest ever budget presented for the State of Sarawak amounting to RM11.914 billion which is almost double compare to RM6.4 billion in 2015, RM8.04 billion in 2016, RM8.13 billion in 2017 and RM8.23 billion for the year 2018.

The proposed State Budget for 2019 marked another history in the milestone of Sarawak governed by the present GPS Government.

The Sarawak State surplus and people’s centric budget for 2019 were strategized and focused on six main objectives namely development biased and rural focused, development agenda, digital economy, investment driven economic growth, private sectors as the main engine of economic growth and last but not the least, effectiveness of service delivery system.

Tuan Speaker, the development biased and rural focused budget is very important to Sarawak as the State of Sarawak is still very far lacking behind in terms of physical development compared to some other states in West Malaysia. The lack of infrastructure facilities, basic utilities and telecommunication particularly in the rural areas is still one of the major problems faced by the people of Sarawak. Without good infrastructure facility, basic utilities such as electricity, water supply and telecommunication services, there is no way the economic prosperity of the rural communities be improved to a highest level.

Tuan Speaker, the amount of RM9.073 billion or 76% of the total budget allocated for the development expenditure in 2019 is very appropriate for a developing State like Sarawak. The substantial amount of development budget presented for the year 2019 reflect the seriousness and continuous effort of the State Government to accelerate the development of infrastructures like roads, water coverage, electricity supplies and telecommunication network which are vital for the livelihood of the people in Sarawak particularly in the rural areas. This will also enhance the socio-economic activities of the rural population.

Tuan Speaker, based on 2015 population census, 58% of the population (out of 2.63 million total population of Sarawak) lives in urban areas whilst 42% of the population resides in the rural areas. In order to achieve the target of high-income economy for the whole State of Sarawak by the year 2030, there must be a balance of development between the rural and urban areas. In view of high percentage of the population still living in the rural area and the imbalance of development between the urban and the rural areas, it is therefore, appropriate that more funds should be allocated for rural development.

In addition to this, I wish to thank the State Government and Yang Amat Berhormat Chief Minister for his farsighted vision to transform the State by giving special consideration to continue the implementation of an important development agenda such as the Socio-Economic Transformation, Rural Transformation and Performance and Service Delivery Transformation programmes for the State. These are important to spur the economic growth and development throughout Sarawak.

The total allocations of RM2.350 billion to this programme is appropriate to finance and implement various key economic based projects such as the Rural Transformation Projects, Minor Rural Projects and the newly introduced Program Penambahbaikan Rumah

Miskin Sarawak (PPRMS). This will definitely further intensify the development which will have high impact to the people in the State particularly in the rural areas.

On behalf of the people in my constituency N.49 Ngemah, Tuan Speaker, I would like to take this opportunity to thank the State Government for the allocation of RM5.0 million under the Rural Transformation Programme for this year, which was used to implement various infrastructure projects such as the construction of roads, construction of jetties, installation of street lighting as well as upgrading the existing projects in the longhouses in my constituency.

Tuan Speaker, as a Sarawakian we cannot deny the fact that Malaysia Agreement 1963 (MA63) is of prominent important to the people of Sarawak. It is heartening to note that the State GPS Government and our fellow leaders led by our Right Honourable Chief Minister are committed in reviewing the contents of MA63 whilst the Steering Committee formed by the Federal Government somehow portraying discriminatory, not impartial and unfair numbers of relevant state representatives selected for the reviewing of the MA63 in the Capital city of Malaysia which is Kuala Lumpur.

Thus, the formation of the State Advisory Committee is a benchmark for us to initiate as per se to review the Agreement which will strengthen bold figures from Sarawak to fight for the right of Sarawakian.

On this Tuan Speaker, I would like to propose that the committee should stress more on the important things that we are lacking behind such as education, public health facilities and oil and gas agreement which is the three vital forsaken elements that we are still lacking behind since the formation of Malaysia 52 years ago.

Now, I would like to address some of the issues which is pertinent in my constituency which need urgent attention from the Government. First and foremost is the upgrading the Rantau Dilang gravel road which was completed in the year 2013. And this road is still under the gravel road which is under the category of R2 road. However, our locals demand is that the road should be tar-sealed until now they have not tar-sealed the road because the road is already, gravel road is completed but it is not tar-sealed so the local are having a very high hope that the road could be tar-sealed as soon as possible. The length of the road is approximately about 12 kilometres. I hope relevant Ministry can take into consideration as because that is the urgent needs of my constituencies.

The second one is the upgrading of spur road this is also a gravel road from Ng Ngungun to Ng Bat which is about seven kilometres in length. The road is in really bad condition. At the moment a lot of long houses using this road estimated to be about seven to eight long houses are using this road from Ng. Ngungun to Ng Bat. So, I hope the relevant agencies could look into this seriously as soon as possible because the road is in the bad condition now.

Thirdly, it is about the long over-due road from Nanga Ngungun to Nanga Jagau road which about 22 kilometres, which was already promised by our past Government the Barisan Nasional Government and also it is to be carried out to the present Government in the context of the GPS Government under the State of Sarawak. I certainly hope that this project could be put into under URDA project which is the cost of the project is about RM100 million and estimated to be RM100 million and I wish I hope that the State Government or the URDA, Upper Rejang Development Authority Agencies, could look into this project as soon as possible so that because the people are having a high hope that the road is to be constructed since few years five or six years ago. And I wish to know that whether the URDA or Upper Rejang Development Agency had taken into account to this project.

Fourth, Construction of Water Treatment plant for Ng. Kabah because the area along Nibong-Tada Road is having a problem of water supply. With the construction of the water treatment plant at Ng. Kabah is where certainly improve the water supply in Nibong-Tada Road. Water supply is also cater for the area nearby whereby a lot of long houses and schools nearby the area so I hope the Ministry can look into this and have a look go to the ground and see what are really happening in that area.

Fifth, re-location of SK Ng. Balingiau which is SK Ng Balingiau is a school whereby it is frequently having flooded almost every year. It is flooding especially during wet season, the school is facing flooded problem. So I hope the relevant Ministry or State Education Ministry could look into this and have a visit to this school when the time comes. This SK Ng Balingiau should be shifted or relocated because that area is very low line.

Sixth, I wish to request for Ngemah to be given a Sub District if not a District status because the population in Ngemah is consisting about of 20,000 people. So I think it is one of the criteria for giving a certain area Sub District or District status certain area must reach certain population. So in this case, I wish to request for Ngemah to be given Sub District status as soon as possible or anytime to come.

Last, regarding the point issue raised by the ADUN Kidurong for Honourable Member for Pelawan just now regarding the PAC report for Tanjung Manis water supply system which is not functioning actually I am as one of the PAC member including the few of PAC member who are inside this Dewan including two from opposition that is a ADUN for Kidurong and ADUN for Batu Lintang. Two of them from opposition and the PAC members from our side also. We had visited the site on the 17th October 2018.

That is a last month visited the site Tanjung Manis and the process of getting the report, we are still doing on the report what we call it audit report. For us to study and we will try to study the report and we will provide the findings when the thing is ready. We have not yet call for the hearing for that particular issue which raised by the Honourable Member for Pelawan just now. I think you will have to be patient on that we are still doing the report on particular project. Regarding walkabout project, he don’t understand what is a walk about project. Walkabout project is a project which is very important for the rural population because sometime Yang Amat Berhormat Chief Minister go to the ground because he is giving immediate project to the people.

Sometimes he mentioned about the project and gives the project on the spot. That is the walkabout project. I hope you Opposition don’t politicise on what the project about. You don’t know the project about but this walkabout project is very important to the rural population not only for rural population but to urban population as well. But if we don’t about the walkabout project, I think you cannot be, not only the Yang Amat Berhormat Chief Minister giving the walkabout project, we as a Wakil Rakyat also are giving walk-about project in terms of giving immediate project like when we go to the longhouses, we announce the project for the rural people in the longhouse. So, we have to what we call it the project should be given and not promise. Ok?

Mr Speaker

Are you taking?

No, no. I just want to explain what walkabout project is. It is ok, it is ok. Walkabout project, you don’t know. Walkabout project is the project given to the recipient, to the people on the ground then is when there is a function, during the function our Yang Amat Berhormat Ketua Menteri announced the project, ok? I think you pretend not to know. It is on the spot. The project is given on the spot for the benefit of the people like our fellow Wakil Rakyat, we are also giving walkabout project on the spot we give them as long as we have the budget, ok? Thank you.

Lastly, with this note Tuan Speaker, I wish to support the Supply 2019 Bill, 2018. Last but not least, Tuan Speaker, I wish all the Christian friends in this House, Selamat menyambut Hari Krismas and to all our Muslim friends, Selamat Hari Maulidur Rasul and to all a Happy New Year 2019.

Thank you.

Mr Speaker

Can I have a show of hands how many Members wish to speak? Under Standing Order 9, I determine that today’s Sitting goes beyond 6.30 pm. Honourable Member for Engkilili.

Thank you very much for giving me the opportunity to participate in 2019 Budget debate. I especially wish to put into records my thanks and appreciation to the Chief Minister for presenting a record budget of RM11.9 billion with a focus on rural development to stimulate economic progress.

I am indeed very grateful to the Chief Minister for presenting this development-based and rural focus budget to stimulate a higher level of economic activity and economic progress for Sarawak.

The budget shows how the Sarawak Government increases its revenues by giving back to the people of Sarawak and focusing on closing the development gap between the cities and the rural areas through basic infrastructure development in the rural areas so that the people can uplift their socio-economy and giving focus to various kind of developments including digital economy.

I felt that the Sarawak Budget 2019 presented by the Chief Minister will transform Sarawak not only from the perspective of physical development as it emphasises on the welfare and prosperity of the people of Sarawak.

Mr Speaker, please allow me to touch on the development needs of my constituency DUN N.33, Engkilili. I would like to convey the requests of the people in my area as follows:

Roads

It is requested that a road be built from the areas of Stuga/Empelam/Ensurai/Basi/Lio/Tekalong/Pedalai/Tanjong/Ijok/SRK Ijok/Langkang/Tawai/Pak, all in the Batang Air Hilir Engkilili area, leading to Sri Aman. This road has been proposed for a long time. Compensation for crops and land has also been paid by the Government several years ago. This road is very much needed by the residents there. However, the road has still not been built.

It is also requested that a road be built to connect SK Empelam/Kawasan Geligau Ili/Geligau Ulu/Rh Dennis Nayang Ensurai/Kawasan Rh Timbang/Kawasan Rh Belayong Sepalau, which are located near the bank of Batang Ai Hilir Engkilili.

I also request that Jalan Tebarong be built and widened to lead to Rh Rawing and Rh Repong.

It is also proposed that the road from SK Tabut/Rh Karim Tabut to Jalan Rh Jangin, Kejemut, Lidong be repaired and resurfaced. This road is full of potholes and is very difficult to pass, and the area is also frequently flooded. I request that this road be repaired and upgraded.

In addition, I request that the roads in the areas of Lidong/Kawasan Tisak/Kawasan Kaong/Kawasan Rembai, located beside Nanga Skrang Hilir leading to Sri Aman, be widened and resurfaced.

It is also requested that the access road to the longhouse in the Kubal Lidong area be resurfaced and repaired again.

I also request that the access roads to the longhouses in the Ulu Skrang area, from Nanga Tebat to the Ng Menjuau/Sg Paya area, be considered for construction immediately. These roads are the only access roads there. They will also be the route connecting three primary schools and a clinic, namely SRK Ng Tebat, SRK Ng Menjuau, SRK Ng Entalau and also Klinik Ng Entalau.

The access roads to Rh Tawi Ng Belawan/Rh Chunggat Ng Pulau/Rh Sigan Ng Pelo/Rh Nyandang Ulu Akup are requested to be upgraded. During the rainy season, these roads cannot be passed by vehicles.

Likewise, the access road to Rh Gaik Keranggas and Rh Belisan Tinting Pisang Ulu Skrang is requested to be built immediately.

I also request that the junction road from the former Jalan Balak leading to Rh Dau Ng Entalau, Skrang/SK Ng Entalau/Klinik Ng Entalau be repaired and upgraded as well. These roads are frequently cut off and difficult to pass.

Bridges

It is requested that a bridge be built over the Batang Lupar River to connect the Lidong/Sri Aman area. This will facilitate access for the residents of the area.

It is also proposed that a bridge be built to cross the Ulu Skrang River at Ng Entalau, where the longhouse, clinic and school are located. With such a bridge, the hardships faced by the people there will be overcome.

Water Supply

Mr Speaker, I would like to touch on the water supply in my area. Clean water supply or non-clean water supply is indeed a daily problem and very critical in most longhouses and villages or anywhere in the DUN Engkilili area. I am very happy to welcome the announcement of allocations from the Government and intend to improve the water supply, especially in rural areas such as Engkilili. Water supply is an important basic need for humans. Without water, people will suffer. In the villages and longhouses, most places have no water at all. The Iban say, Mr Speaker, "Ai kena birak kena kemi pan nadai". This is the true picture: there is no water even for defecating, and no water even for urinating there. This is the situation that occurs in the rural areas of Engkilili. This is what the Iban there truly say. Every time I go down to the field, "ai kena kemi nadai YB ai kena birak nadai meh tu, ko ia". Yes, this is true.

Although we have water supply plants in Engkilili/Sebeliau/Skrang, water supply from these plants is often cut off for weeks. The most painful times are during feasts or when someone passes away. This is when the lack of water is most keenly felt by the residents of the area. At the very least, the people in my area should be provided with drums. In the past they were 1Malaysia drums, and now they may be Sarawak drums (GPS) or temporary water tanks. I propose that

the longhouse areas of Btg Ai Hilir/Skrang Hilir/Kawasan Lidong Bangat/Tanjong/Enteban/Memaloi/Semuch/San Semanju/Merindun/Sg Keruh Engkilili be prioritised so that this problem is resolved immediately.

Agriculture Sector

Mr Speaker, I would also like to touch on the agriculture sector. I welcome the steps taken by the Government to transform rural development through the agriculture sector. Through this sector, it will increase the income and standard of living of the people, especially in rural areas. Now the prices of commodities such as palm oil, rubber, pepper and so on have fallen, while the prices of essential goods keep rising, although PH said that the increase was due to the GST earlier. Now there is no GST, yet goods are still rising in price. In the past, goods rose supposedly because of the GST. If we go to town, coffee shops and so on, all goods have gone up. Now there is no GST, yet the prices of goods are rising. This is what is felt by the village and longhouse people and so on.

Most of the Engkilili area consists of farmers. Therefore, I request that more allocations be distributed through the Venture Capital Programme for activities such as rearing pigs, cattle, goats, chickens, ducks, burung walid, fish farming and so on, for all farmers who are interested. Allocations for fruit crops such as durian trees and other fruits also need to be subsidised and assisted for these farmers through the District Agriculture Department of Lubok Antu and Engkilili.

Settlement Land/Extensions Penduduk Skrang Skim

For this application, I have already applied several times in this House. I am informed that it has been delayed at the Lands and Surveys Department. I request that its approval be expedited to overcome the shortage of land for building new houses because the population is increasing rapidly.

Repairing Schools

Mr Speaker, I also wish to propose that SK Nanga Menjuau, SK Nanga Entalau and SK Nanga Tebat receive assistance from the Sarawak Government to repair the teachers' rooms, classrooms and hostel rooms if the federal government is unable to help.

NCR Land

I would also like to touch on NCR land. Allocations for surveying NCR land under the programme of surveying Bumiputra Customary Rights (NCR) land under the new initiative have not been allocated by the PH government as in their previous budgets. Therefore, I request the Government to allocate financial assistance to continue the surveying programme that has not been completed in the State of Sarawak, especially in my area.

Mr Speaker, politically, the political situation has changed since the last PRU. In my view, only Sarawak-based parties (Sarawak Based Party) understand the problems of the people of Sarawak better and can develop this state. Barisan Nasional has been dissolved at the Sarawak level and replaced by GPS as the governing Government.

For us in United People Party (UPP), we will always support Honourable Datuk Patinggi (Dr) Abang Zohari as the Chief Minister of Sarawak. We will support his leadership to lead Sarawak into a new era as a developed high income state, and solidly

stand firm behind him to get back Sarawak's right as stipulated in M63 Agreements. Oleh yang demikian, maka rakyat Sarawak haruslah bersatu padu di bawah kepimpinan the Honourable Chief Minister dan sentiasa bekerjasama dan terus menyokong kepimpinan beliau. The destiny of Sarawak only can be determined by Sarawakians.

Mr Speaker, to conclude my speech in this august House, I now move to support 2019 Budget. Thank you once again Mr Speaker. Merry incoming Christmas to fellow Christians and Happy New Year to all of us. May God bless us.

Thank you very much.

Mr Speaker

Honourable Member for Pujut.

Dr Ting Tiong ChoonDAP · PHPujut

Thank you, Tuan Speaker, for allowing me to debate on this Budget Bill. The Sarawak Budget delivered by the Honourable Chief Minister on Monday is considered a historical budget because it is the first ever State budget exceeding RM10 billion. However, what is an average Sarawakian get from the Sarawak Budget of RM10 billion? What is the RM1 million urban poor get from the RM10 Billion Budget? To me, this is an opportunity lost by the GPS State Government. An opportunity of a major tax revenue that may create a brighter future for Sarawak wasted.

The introduction of Sale Tax on Petrochemical products by GPS Government is assumed to bring in 3.9 billion ringgits to Sarawak’s coffer. This is a good initiative, and it is better late than never. The tax is earmarked to start hastily on the 1st January 2019 and I believe the State Government has not discussed with the major players that is PETRONAS. With this new-found windfall by the GPS Government, Sarawak is streaming toward a much bigger expenditure program, with more than RM6 billion allocated in 2019 for rural development.

One of the major rural development expenditures is the so-called the Walkabout Projects. Now, this is the first time that we heard this “Walkabout Projects”, and so far, RM6.3 billion have been approved for implementation. Now, what is a walkabout project? That Honourable Member for Pelawan earlier on has touched on this. I Google search the meaning of “Walkabout”, we can find “Walkabout Shoes”, we have “walkabout.com”, “Walkabout Hotel” and even a 1971 movie titled “Walkabout”. The Australian Definition of Walkabout is, its come from Australia: “A journey undertaken by an Australian Aboriginal in order to live in the traditional manner”. The British Definition of Walkabout, “an informal stroll among a crowd conducted by an important visitor”. My version of a walkabout is “to wonder aimlessly on the street just to kill my time”.

I try, I struggle to translate a walkabout into Chinese translation and a Malay translation, I am not sure whether we called it jalan-jalan projek.

With RM1.535 billion walkabout project to be spent in 2019, it is not a small amount, it equivalent to RM30 million a week, RM30 million a week to be spent. Can a Minister please tell us what are these walkabout projects? Where are these projects? Who are implementing it and who are overseeing these projects? Are they big projects, small projects? Are they formal or informal? Was there any planning done? Or are all elected YBs eligible to claim for funding? Or are they just a sum of money at GPS indiscriminate disposals.

Mr Speaker

Are you taking clarification from Tasik Biru?

Dr Ting Tiong ChoonDAP · PHPujut

Yes

Dato Henry Harry Anak JinepPDP · GPSTasik Biru

I enjoyed it when you mention about the dictionary meaning of the walkabout that is from the Australian version.

Dr Ting Tiong ChoonDAP · PHPujut

No... No…No.

Dato Henry Harry Anak JinepPDP · GPSTasik Biru

That is the Australian version, can you refer to the British version?

Dr Ting Tiong ChoonDAP · PHPujut

I didn’t say...

Dato Henry Harry Anak JinepPDP · GPSTasik Biru

You didn’t say it. Because you say that you from Australia, because you come from Australia.

Dr Ting Tiong ChoonDAP · PHPujut

No... No... No... The Australian definition of Walkabout is “an informal stroll along the crowded conducted by an important visitor”.

Dato Henry Harry Anak JinepPDP · GPSTasik Biru

A Walkabout in a British dictionary is “an informal stroll among a crowd conducted by an important visitor.” That is by Yang Amat Berhormat Chief Minister.

Thank you.

Dr Ting Tiong ChoonDAP · PHPujut

I think the definition will need a better term maybe need to be created by GPS Government, it looks a bit silly with the Walkabout Project.

It is interesting to note that in 2019, our revenue of 10.5 billion are mostly coming from our natural resources: Oil and Gas Industries 60%; Lands and Agriculture14%; Dividends & Interests 24%; and Other services 2%.

Tuan Speaker, nearly RM4 billion ringgits of additional Sales Tax is projected to be received by the treasury in 2019. Can the Minister please advise this chamber how much is the estimated Sales Tax collectable from each category of items listed in (d) part (i) to part (ix) in the Government Gazette No.58? So far, we have the details of spending the money but absolutely no details on how the revenue is going to be collected on this Sales Tax? May I remind the Government "don't count your chickens before they hatch".

One of the items affected by this Sales Tax is urea, which is the major component to produce fertilizer. The tax will certainly increase the cost of the fertilizers and the agriculture sector will bear the brunt of this tax, in particulars, the rural farmers and the oil palm industries. Oil, Gas and the Petrochemical manufacturing industries are our major sources of employments and businesses, and I urge the Government to remove the urea from the taxable items of State Sale Tax.

With our rich natural resources, we shall look forward to a better future. It is imperative that the State and Federal Government need to resolve the oil royalty in an amicable and mutual way. We should not kill the goose that is laying the golden eggs.

Tuan Speaker, while natural resources are important, we shall need to invest and nurture our available human resources. I call the State Government to put more efforts into developing human resources. One of the reason our economy is underperforming is due to the continuous out-flow of our skilled and unskilled people and the least that Sarawak Government can do is to retain our people in Sarawak by increasing the opportunity of their employments in Sarawak. Our lack of manufacturing industries and our poor major transportation infrastructures are killing our potentials in Sarawak.

New Baby Incentive

The new initiative of one-off incentive of RM1,000.00 “Baby Bonus” starting next year is much applauded. This initiative is expected to cost RM44 million ringgits a year. Can the Minister please clarify who owned these RM1,000.00 on the birth of the baby? Is it the baby? Is it the mother? Or is it the liability of the State Government when the child turned 18? Can the Minister please confirm or deny the recent news reported that new born baby from next year will get at least RM12,000.00 when they turn 18? If this is not true, can the Minister also provide an approximate value when they turn 18?

Tuan Speaker, Amanah Saham Sarawak was started more than 20 years ago. It was considered, at the time, to be a major initiative for the rural people, mainly the Dayaks, where their economy future is secured with the Amanah Saham Sarawak. Many years later, the Saham was doing poorly and Sarawak Government has decided to guarantee a minimum one ringgit per unit value. Today, I believe the value of each unit is worth less than 10 cents and the Sarawak Government liability of the guarantee is amounting to around 439 million ringgits as of last financial year. And looking at the financial performance, or rather non-performance of the Amanah Saham Sarawak (ASSAR), with the management fees along costing more than 10% of the value of the asset each year, it is only a matter of time that the value of the unit will disappear to zero. The initial hu-ha of Economy Security for the rural people has now evaporated into hot-air. Could the good baby-bonus initiative today become hot-air in 18 years?

In view of the current economic situation, and to avoid another Amanah Saham Sarawak with current administration, may I suggest that the RM1,000.00 to be given as cash incentive to the mother as assistance on the birth of a new baby.

Rural Development Project

61 families in Kampung Sungai Arang are still not able to receive clean and reliable water supply despite multi-millions water filtration plant was installed few years ago and an annual operational cost of at least RM50,000 which is equivalent to RM70 per family per month. It looks like the Government has no concern on this despite the villagers crying out for assistance for years. Several promises to rectify the shortcoming were not relied and to this day, the villagers still have no daily clean water to live on. I believe the installation of “Tong Biru” for the 29 rural families in Sarawak, in Sungai Arang and re-adjustment of piping and extending the water filtration plant operating hours from three to five hours shall allow all the residents to have adequate clean water and it cost about RM20,000.00 to RM30,000.00. So far I am unable to get any funding.

Tuan Speaker, this is why the common Sarawakians are concern with all these supposedly mega millions rural developments. The expenditure on rural may look good on papers but the rural communities are not getting the benefits they deserved. It is imperative that the Government shall exercise their transparency, integrity and good governance.

Miri City Council (MCC)

In October 2012, Miri City Council (MCC) decided to tender the Miri City car parking management to private entity. The contract was awarded to Miri Parking System Sdn Bhd from Kuching, with the rental of RM10.00 per car parking space per month.

However, a well-known local contractor was not offered the contract by Miri City Council despite the contract price of RM15 per car park per month, which is more than 50% higher than the final contract price. In the past five years, Miri City Council has lost millions in revenue with that poor and unusual decision.

In another case recently, a beach cleaning contract was awarded to a company which is owned by a Councillor of Miri City Council. The contract is reported to be worth more than a million, and I was told the contract price is much higher than other bidders. This unusual contract would have cost Miri Residents a few hundred thousand over a few years and I believe that the particular councillor has resigned following some private negotiation with other councillors.

Now, Miri City Council has learned the practice of the BN Government that is selling asset cheaply and buying services at very high prices.

Can the Minister for Local Government please explain to the people of Miri why and how this could had happened? If they are transparent, was there any hanky-panky in the process, and whether Miri City Council will practice a truly open tendering process in all future contracts, including the car-parking management contract which is due to expired in the next few months.

Tuan Speaker, Visit Miri Year 2018 is coming to an end. Many residents and businesses have voiced that we have failed in promoting tourism in Miri. There is no significant increase in tourists or economy in Miri this year. Can the Minister for Tourism please provide a summary of what are our achievements in Miri this year from Visit Miri Year? And whether any lesson can be learnt to apply for Visit Sarawak Year in 2019?

Permanent Residency

A 63 years old female who resided in Miri for more than 30 years with her all Sarawakian family, has lodged an application to the Immigration office in Miri for permanent residency on 13th July 2011, with reference number PM/Q2/11/000038. Her application was processed by the Immigration department and it was sent to Sarawak State Office on 28th November 2012 for review. Till today, six years later the application is still on the desk of the State Secretary.

Another case in question, also from Miri, now aged 49. She was born at Kuching General Hospital in 1969 and spent most of her life in Sarawak. She applied for permanent residency in 2014 with reference number PM/Q2/14/000033. The application form was referred to Sarawak State Office on 30th June 2016. So two and a half years ago. Till today, there has been no reply from the State Secretary Office too.

Now, why does the State Secretary Office take so many years to process? I would appreciate if the State Secretary will review these two applications immediately and also many others which are well over due. Can the Minister inform this chamber the integrity of the application process, and the number of applications that are sitting idle in the State Secretary Office?

Klinik 1Malaysia at Long Lama

Tuan Speaker, Klinik 1Malaysia Long Lama was established in 2014 following the relocation of Klinik Kesihatan Long Lama across the river opposite from the town. The Klinik 1Malaysia was opened in 2014 following the request of the local community, on the promise that it will be closed after the Long Lama Bridge is open. As the Bridge is scheduled to open in March next year, Klinik 1Malaysia is marked to be closed as planned. Unfortunately, both GPS member of this house and the political secretary are now complaining about the closure and alleged the new Pakatan Harapan Federal Government is not taking care of the rural community.

Let me explain the rationale of closing the Klinik 1Malaysia Long Lama next year. For the information of the Members of this chamber who may not be familiar with Long Lama. Long Lama has a new cluster clinic which was opened to public on 22nd May 2013, and it was officially launched by Yang Berhormat Member for Nangka on 1st November 2017, I don’t know why it take four and a half years to officiate to open it.

Klinik Kesihatan Long Lama is served by four Medical Doctors and one Family Medicine Specialist. It has supporting services like Laboratory, Pharmacy, X-ray, Physiotherapy, Occupational Therapy, Labour Room and Admission Ward. The clinic also provides Emergency services after office hours, including ambulance transfer of patients from across the river.

Klinik 1Malaysia Long Lama, on the other hand provides only very basic health care with, no doctors on duty but 5 paramedics and supporting staff. The annual operating cost for Klinik 1Malaysia is RM300,000, and the average daily patient attendance to the clinic is three patients per day costing RM300,000 a year. In another word, a patient attending a basic medical care such as cold and flu will cost RM300.00 per attendance. Surely, these monies can be used more efficiently and more effectively if we can transfer this money to Klinik Kesihatan Long Lama. I don’t know why the GPS Member or the Political Secretary complaining about the closure, one thing is that they promise they agree for it to be closed after the opening of the bridge and now they complain. Now with all these reason it is clear and sensible to pool all the funds to Klinik Kesihatan Long Lama and so the decision to close Klinik 1Malaysia is a wise decision.

Ministry of Health confirmed that all staff from Klinik 1Malaysia will be reallocated to Klinik Kesihatan Long Lama and I believe that the healthcare services in Long Lama or Ulu Baram will be better provided by this single Klinik Kesihatan Long Lama.

Conclusion

Tuan Speaker, 5.9.2018 General Election has changed the political landscape in Malaysia. When BN was in power, the voices in the chambers were in romantic-sunshine stage everything is good we heard that Najib was the best PM ever, we heard that Sarawak Government gave up our request for 20% gas and oil royalty, which this house has passed unanimously, because we were sympathetic to Najib-BN, we heard praises all over in this house with the previous BN Budgets.

Now it is disappointing that the GPS Opposition is now embarking on the confrontational attitude in dealing with the Federal Government. Don't blame everything on Pakatan Harapan at Putrajaya. GPS shall not have any complain on Pakatan Harapan.

Mr Speaker

Honourable Member, your time is up.

Dr Ting Tiong ChoonDAP · PHPujut

One minute please. GPS has no right to complain on unfair treatment when you yourself is not even fair to your fellow Sarawakians. Before you complain further on unfair treatment, you should at least provide funding to all the elected representatives not just GPS representative.

May I remind GPS Government, stop complaining and be strong to govern Sarawak just like the DAP-led Penang and PKR-led Selangor in the past 10 years. Both States has acted boldly, confidently and without much dependency from Putrajaya. Maybe there are lesson to be learned from them. With that I conclude my debate on the Budget 2019 Bill.

Thank you.

Mr Speaker

Any other Honourable Member wishes to speak? That last speech concludes the business of the day. Ahli-ahli Yang Berhormat, the sitting is now adjourned and the House shall resume its sitting at 9:00 am tomorrow.

(Mesyuarat ditangguhkan pada jam 6:33 petang)