Terengganu · 16 April 2025
15th Assembly, 3rd session, 1st meeting · 176 turns · 27,546 words · official PDF ↗ · Digital Hansard ↗
ExperimentalTerengganu publishes one PDF per meeting, with the written answers appended. Speakers are matched by our parser and will have some errors.
Oral QuestionsQuestions
The morning sitting continues with Oral Questions. The following Honourable Members have given notice of their intention to put Oral Questions today, 16 April 2025:-
1. The Honourable Member for Seberang Takir 2. The Honourable Member for Permaisuri 3. The Honourable Member for Hulu Besut 4. The Honourable Member for Rantau Abang 5. The Honourable Member for Batu Rakit 6. The Honourable Member for Langkap 7. The Honourable Member for Air Putih 8. The Honourable Member for Telemung
9. The Honourable Member for Bukit Tunggal 10. The Honourable Member for Kuala Besut 11. The Honourable Member for Bukit Besi 12. The Honourable Member for Sura 13. The Honourable Member for Bandar 14. The Honourable Member for Jertih 15. The Honourable Member for Kuala Berang 16. The Honourable Member for Buluh Gading 17. The Honourable Member for Kemasik 18. The Honourable Member for Ladang 19. The Honourable Member for Pengkalan Berangan 20. The Honourable Member for Manir
Please, the Honourable Member for Seberang Takir, to put your question.
Thank you, Mr Speaker. My question is number 2-
What is the current status of the solar project at Tasik Kenyir? What revenue will the State Government obtain from this project?
The question from the Honourable Member for Seberang Takir has been combined with that of the Honourable Member for Manir. Please, the Honourable Member for Kota Putera.
Thank you, Mr Speaker. Thank you also to the Honourable Member for Seberang Takir. The question is as stated.
At present the Solar project at Tasik Kenyir is focusing on the Phase 1, Block 1 development with a capacity of 640 megawatts, as I mentioned yesterday. The overall capacity for solar development at Tasik Kenyir totals 2,500 megawatts, and this is the First Phase, 640 megawatts. The development of the project is in accordance with the stated timeline, and the timeline for the tender for engineering, procurement, construction, and commissioning, or EPCC, Phase 1 Block 1, valued at more than RM2 billion, whose tender just closed on 15 March 2025. The direct revenue to the State Government from the Hybrid Hydro Floating Solar Sector project for Phase 1 Block 1 with a capacity of 640 megawatts is RM40 million a year. If the details are calculated at the existing rates, the first is the charge payment to the Terengganu Water Board (LAUT), estimated at RM37 million a year.
The second is income through permit payments to the Forestry Department, the permit returns for the use of land for the cable route from the Floating Solar Farm to the TNB incoming substation. Next, the State Government is estimated to receive income through land tax, permit and licence from this project, to the Hulu Terengganu District Council amounting to RM750,000.00, to the Land Office amounting to RM200,000.00, and to the Land and Mines Office and the State Irrigation and Drainage Department amounting to RM300,000.00 in total. And from the First Phase Block 1 this will also open up job opportunities for approximately 150-200 local residents. Thank you.
Thank you, the Honourable Member for Kota Putera. Are there any supplementary questions?
Thank you, Mr Speaker. I think this is what His Majesty Tuanku mentioned, something to be proud of, which His Majesty specifically stated about this new energy sector of solar. So I hope this project is not delayed and can proceed smoothly. According to the EXCO's statement just now, it means the government, once fully completed, will get approximately RM40 million a year. This does not yet include land tax and also the debt tax, which was not mentioned, the route through the forest cable. So I think this must be continued and, if possible, Tasik Kenyir is still large, and I believe there is still much that can be used for this solar energy. Thank you.
Her question, Honourable Member?
The forest area route just now was not mentioned, how much this company has to pay to the Forestry Department. Just now the Honourable Member mentioned the Land Department RM750,000.00, the Government gets approximately RM40 million, and LAUT gets RM3.7 million. I think if possible this data can be stated once again clearly, the route passing through the forest area, perhaps it has to be felled or something.
Does the Honourable Member need to give notice?
I can answer. Thank you, Seberang Takir. For the licence to the Forestry Department for the use of land for the cable route, the income is RM1.2 million a year. For the information of the House too, this 640 is only what has been estimated; the overall usage is 2,000 megawatts. So for what has been approved now, as mentioned yesterday, the environmentally sensitive area Level 1, only this 640 has been approved. Additional capacity will be applied for from time to time according to the project. Thank you.
Yes, please, the Honourable Member for Manir.
Honourable Mr Speaker. The supplementary question from Manir is whether all the solar farms built in the State of Terengganu are recognised as solar farms that comply with the Green Energy requirements in terms of forest felling or the like. Thank you.
Please repeat, not clear..
Okay. When we want to build solar we have to fell forest in some places. If the trees are felled, is it still recognised as green energy and does it comply with the criteria, complying with the requirements stipulated in green energy now? Thank you.
Okay, thank you Manir. According to my understanding, what involves non-green is if it involves gazetted forest reserves. If it is indeed on government land, it does not involve that calculation. Thank you.
Thank you, the Honourable Member for Kota Putera. Next I invite the Honourable Member for Permaisuri.
Thank you, Mr Speaker. My question is question number one. Thank you.
Agriculture is among the sources of income for the people of the State of Terengganu. Please state what are the top three (3) types of agriculture that can provide high income for the people, which need to be encouraged and need to be advanced with effective agricultural infrastructure?
Question number one, the Honourable Member for Jabi, please.
Mr Speaker, thank you, Honourable Member for Permaisuri.
The agricultural sector that has the potential to provide high income to the people. Mr Speaker, the Government more prefers to propose that the public get involved in the short-term crop sector. The capital is not too big, the care is more practical, and the results are fast, and initial capital can be applied for from the State Government Agricultural Capital Loan Scheme. Land plots from government land may apply for LPS, and the TKPM areas are also dedicated to short-term crops with a very low rental rate, the lowest in the country, RM 250.00 per hectare a year.
Currently Terengganu has five TKPMs, namely TKPM Rhu Tapai in Setiu, TKPM Tok Dor in Besut, TKPM Serating in Marang, TKPM Peradong in Kuala Terengganu and TKPM Paloh Jenang in Kemaman, with an area of 1,194 hectares.
Under the Terengganu Agricultural Strategic Plan 2024-2030 there are six more TKPMs to be established, namely TKPM Telaga Papan in Setiu, TKPM Pela, Hulu Terengganu. Is that right, Telemong? Is the pronunciation correct, eh? TKPM Pinang Merah in Dungun, TKPM Rantau Abang, Dungun, TKPM Kemasik, Kemaman and TKPM Bukit Rong Ubi in Kuala Nerus, thus completing that every district has a TKPM.
For operators who are capable in terms of capital, durian cultivation is among those recommended which can generate lucrative yields. Durian products, whether fresh durian or processed, from Malaysia have actually entered the export market. Malaysia signed a new protocol with China for the export of frozen durian in May 2019 and there was a second protocol for the export of fresh durian in 2024. So, in line with the high demand in the durian sector, the State Government is focusing on 2 strategies. The first is the opening of new orchards and plantations for durian cultivation, and the second is the rehabilitation of existing durian orchards and durian planting areas in the State of Terengganu. In 2016 there were 1,695 hectares, now it has increased to 3,165 hectares in 2023. So the increase is approximately double.
Coconut is also in high demand for the production of santan products, young coconut, and also tuak water, nira water, and coconut production can reach approximately 25 metric tonnes/hectare. If we calculate in terms of nira water, the average can reach 240 litres per tree a year with an average of 12 mayang per tree, and downstream products with added value such as coconut nisan can also generate additional income. Now there is also the largest coconut plantation project being developed at Kampung Banggol, Setiu, covering 1,200 acres, by the State GLC, Ladang Rakyat Terengganu Sdn. Bhd.
Aquaculture farming is also among the focuses of the State Government. For 2023, the total aquaculture production of Terengganu was 5,580 metric tonnes, valued at approximately RM96.59 million, whether freshwater or brackish water fish farming, which is a source of income for approximately 500 registered farmers.
Under the Terengganu Agricultural Strategic Plan 2024-2030 there are several strategies that have been formulated involving the aspect of strengthening fish hatchery centres, the provision of aquaculture input assistance to small and medium-scale operators, and thirdly, strengthening the freshwater fish cage farming project at Sungai Como, Tasik Kenyir, DUN Telemong.
Fifthly, for broiler chicken farming, which is also developing rapidly in Terengganu. At present the SSR for broiler chickens has increased from 68% in 2022 to approximately 72% in 2023, and JPV has done a gross margin analysis for 2023, the estimated income of an operator with a capacity of 160,000 birds per cycle is approximately RM98,000.00. This is among the sectors assessed as able to generate lucrative income for the people, and the State Government is taking the necessary steps so that this sector with its great opportunity can be best utilised. Thank you.
Thank you, the Honourable Member for Jabi. Please, supplementary questions.
Firstly, I would like to congratulate the Honourable Member who has further strengthened agricultural efforts, which until now have risen to a 7% increase from -4. Congratulations. I consider myself a villager, living in the village, living with villagers, and many of these villagers' agricultural efforts, such as durian, coconut and aquaculture, are mostly in coastal areas, but these villagers do a lot of short-term crop work such as watermelon, melon and so on, planting vegetables. My question is, to what extent have the efforts made by the agriculture department been carried out to further increase the income of short-term crop growers in village areas, for example in the Saujana Setiu, Tembila areas and also in the Telaga Papan area in Setiu, and we have seen that it happened recently, which we villagers call jebbok timun cina, so jebbok means such a huge glut that their production was priced as low as 40 sen per kilogram; this may be due to some technical error. So my question is what efforts need to be made to help increase their income so that the price can reach RM0.80 or RM1.00 at least, because their profit margin is very small and some even have to bear losses. Thank you.
Thank you, please, the Honourable Member for Jabi.
Honourable Member for Permaisuri, I see the main focus of the Permaisuri is the issue of the watermelon glut in Ramadan, before Ramadan and throughout the month of Ramadan until the recent Hari Raya. It is indeed a phenomenon we did not expect, because in Ramadan last year the watermelon price reached as high as RM3 and was stable around RM2, and the trend among our farmers and growers is that when one product rises in price in the previous year, they will all rush to plant it the following year. And this recent glut is not only from the State of Terengganu but from three to four neighbouring states. If I may put it, the market situation is in a saturated condition. Setiu people call it Jebbok, dok. Saturated means there is no more room to fill, with all the marketing mechanisms we have tried to implement, but the impact cannot overcome the effect of supply and demand, because the marketing mechanisms we have are already diverse in terms of contract farms, the permanent farmers' market, fresh fruit stalls, AGRO Bazar and so on from various agencies under the agriculture portfolio. At the same time we are also striving to bring as much watermelon as possible from Terengganu out of Terengganu, because usually at the peak of the harvest season an average of about 40 lorries leave Terengganu every day heading to various destinations to bring watermelons, whether as far as Singapore, the Klang Valley and also the North of the country. The current situation is that the places where the watermelon lorries from Terengganu usually go are all saturated, so it is indeed an unexpected situation. The Department of Agriculture can make scheduling so that gluts do not occur, but we cannot force our farmers to plant or not to plant, because usually when farmers want to choose the time to plant or not to plant, they will look at when to harvest, and the trend is that the high demand for watermelon is before Ramadan, approaching Ramadan and approaching Aidilfitri, so usually they will focus on this period. But based on our experience, we cannot easily conclude that if every year this happens, our farmers will never be able to recover. It is not so; some years it goes up and some years it goes down, therefore as consumers, when sometimes prices rise, let us not too easily say that our farmers "sedak lah harga naik" (are cashing in on the price rise), because when it rises once it may fall twice, and with current production costs watermelon must be sold at no less than 80 sen to break even, whereas if sold at 40 sen or 50 sen it means eating into capital, and we understand the situation, moreover this month of 4, we are faced with the unexpected flood issue, so about 50 watermelon growers suffered losses of approximately RM700,000.00 and, God willing, will be covered by the State Government with allocations from the Terengganu agricultural disaster fund, so we are trying our best, God willing, hopefully our farmers can rise again from the various calamities that befall them. Thank you.
Thank you, the Honourable Member, next I invite the Honourable Member for Hulu Besut.
Thank you, Mr Speaker. Hulu Besut, question number one-
Question number one, please, the Honourable Member for Paka. My question number one-
How many outstanding students were sponsored by the Terengganu Foundation to pursue higher education in 2024, state the fields of study sponsored and the total financial amount involved?
Honourable Mr Speaker, the Honourable Member for Hulu Besut asked about the number of students sponsored by the Terengganu Foundation for the year 2024. For the information of the House, the sponsorship of outstanding students, or the Outstanding Student Scheme (SPC), which we established from 2019 until now, as stated in the 5 million manifesto, we allocated for this Outstanding Student Scheme. For 2024, the Terengganu Foundation sponsored a total of 268 students, namely 239 students domestically and 29 students overseas, amounting to RM3,581,400.00 specifically for 2024 alone. This study covers various fields with the main emphasis on dental medicine, engineering, information technology, health sciences, Islamic studies and also Islamic banking. Thank you.
as stated in the 5 million manifesto we allocated for the Outstanding Student Scheme
Okay, the Honourable Member for Paka has a supplementary question. Please, the Honourable Member for Hulu Besut.
Mr Speaker, I would like to ask whether the students we sponsor overseas will work there directly or whether they will come back and work with us. Thank you.
Please, the Honourable Member for Paka.
For the information of the House, for last year, for overseas students totalling 29 persons by field of study: medicine 2 persons, dentistry 2 persons, engineering, science and accounting 8 persons to the UK, America, Korea and Japan, Islamic banking and qira'at 6 persons in Jordan, medicine and dentistry in Egypt, 6 persons, and also for the preparatory programme, A-level preparatory programme, 7 persons. So far they are still in their first year. For students from before this, the Terengganu Foundation has made agreements with the students to ensure that every student who returns and who uses or receives SPC sponsorship returns to work in Terengganu, but we give them a period because if students return too quickly, afterwards there is no space for what people call suitability of their fit with their respective fields after a period of one year, we open again, where do they want to go, to reduce the "brain drain" issue, so that we try to make use of the skills they have to be utilised within the state. Therefore, the Terengganu Foundation also holds cooperation with the TI, the fields based on the GLC that sponsors them; we hope after they complete their studies, they can serve with the existing GLCs. Thank you.
Thank you, Honourable Member. I now invite the Honourable Member for Rantau Abang.
Thank you, Dato' Speaker. Rantau Abang, question number two-
The second question from Rantau Abang. Please, the Honourable Member for Wakaf Mempelam.
Does the State Government intend to open up more state land for the construction of low-cost houses for low-income and middle-income groups?
Thank you, Dato' Speaker. Thank you to my friend, the Honourable Member for Rantau Abang, who asked about the question shown on the screen. So the answer is yes. The State Government indeed intends to open up more state land for the construction of low-cost houses for low-income and middle-income groups. And for the record, to all Honourable Members, these low-cost houses have now been rebranded as affordable homes (RMM). So we are no longer calling them low-cost houses but affordable homes (RMM). Thank you.
Are there supplementary questions? Please, Honourable Member.
Thank you, Honourable Member. As a supplementary question, I ask the Honourable Member to state what the latest housing projects are in the Dungun District, especially in the Rantau Abang State Constituency, and what the latest developments are.
Yes. The Honourable Member for Wakaf Mempelam.
Yes. Thank you, Honourable Member for Rantau Abang, for the information of the Honourable Member for Rantau Abang and also all Honourable Members. So far, there are a total of 6 housing projects in Dungun involving a total of 1,062 units of houses that are being built and are also to be occupied, God willing.
Of the 6 housing projects that I have mentioned, the first one is in the Rantau Abang State Constituency, namely the RMM Balai Besar project in Rantau Abang, Dungun, involving a total of 182 units of RMM houses, consisting of 128 RMM (Type A) and 54 RMM (Type B). This project has only just begun, and God willing, preliminary work on the site, including earthwork, is being carried out. That is the first.
The second, which is in the Bukit Besi State Constituency, also within the Dungun area, is the AMBS Urban Area Development Project in Dungun, involving 130 units of terraced houses. The current status is building and infrastructure works, and the overall progress or development is 63%. There is a slight delay. The third, in the Paka State Constituency, is the RIR, or Rumah Idaman Rakyat, Desa Idaman Santong in Paka, Dungun, involving a total of 70 units of Affordable Homes, RMM (Type A) 32 units and RMM (Type B) 38 units. Building and infrastructure works are in progress, and God willing, if there are no problems, it is expected to obtain the CCC in July 2025, God willing.
Next, the fourth, the Taman Industrial Park Housing Project, also in Paka, involving 178 units of RMM (Type A) houses. The current status is that building and infrastructure works are being carried out, God willing. And the fifth, namely the Land Development Project in the Kuala Paka area, also in Dungun, involving a total of 348 units, consisting of 139 units of RMM (Type A) and 209 units of RMM (Type B). So in total there are 348 units, and currently it is in the process of applying for Planning Permission (KM). Of the six projects that I have just mentioned, there is only one State Constituency that I have not mentioned, namely the Sura State Constituency. For the Sura State Constituency, the Honourable Member for Sura should not worry, because we already have one project in Sura, namely the Affordable and Mixed Housing Project at Kampung Bukit Tebuk in Mukim Kuala Dungun, Dungun District, within the Sura State Constituency, involving 120 units of RMM (Type A) houses and 135 units of RMM (Type B) houses. The current status is that it is in the process of finalising the draft joint venture agreement between the Government and the company concerned. Thank you.
Thank you, Honourable Member.
Next, I invite the Honourable Member for Batu Rakit.
Thank you, Honourable Dato' Speaker. Allow me to ask a question with a pantun.
From Besut to Rhu Rendang, Continuing the journey to Kemaman, My question is not a comparison, Number one is the choice.
Since the State Government under the leadership of PAS began in 2018, how many land approvals have been granted to the people?
Please, the Most Honourable Dato' Seri Menteri Besar.
Thank you, Honourable Dato' Speaker. Thank you to the Honourable Member for Batu Rakit for raising the question. We are not good at answering pantun at short notice. God willing, we will do so at another time and opportunity. The question from the Honourable Member for Batu Rakit is as displayed on the screen. Since we took over the Government from May 2018 until February 2025, the total number of land approvals was 40,977, of which agricultural land totalled 10,206 and building land totalled 30,771 applications. Thank you.
Thank you, the Most Honourable Dato' Seri Menteri Besar. Are there any supplementary questions?
Supplementary question. Specifically, how much aggrieved land (tanah terkilan) has been approved for the people during the administration of the Most Honourable Member? And if there are still people who come to lodge complaints that they have aggrieved land from before, can it be managed? And if it can be managed, will they be charged the same premium as before? Thank you.
Thank you, Honourable Dato' Speaker of the House, and for the supplementary question. For aggrieved land covering house sites and agriculture that has been approved, the overall total is 7,721 applications, covering 6,303 house sites and 1,418 agricultural lots across all districts. For the second question raised by the Honourable Member for Batu Rakit, there is actually a reason why we set a certain period, because otherwise it would open a fluck gate, with permission, without end. So we set a certain period. At the same time, we can also assess on a case-to-case basis, with permission, to examine whether anything was overlooked during the process carried out on this aggrieved land. That is all.
Thank you, the Most Honourable Dato' Seri Menteri Besar. Next, I invite the Honourable Member for Langkap to raise a question.
Honourable Dato' Speaker, my question number 2-
Soalan?
Nombor 2.
Question number 2. Please, the Honourable Member for Jabi.
What efforts is the State Government making to resolve the irrigation of the paddy granary, Kampung Jelapang Setiu, Terengganu?
Honourable Dato' Speaker, thank you to the Honourable Member for Langkap. The paddy fields in the Kampung Jelapang Irrigation Scheme, Langkap in Setiu, cover approximately 700 hectares. 300 hectares are in the original area cleared by village folk since the early 1970s, while 400 hectares are an area opened by the Government under the Kampung Jelapang Irrigation Scheme in 2009 at a cost of approximately RM47 million. The 300 hectares of the original area are now being cultivated by village folk. As for the remaining 400 hectares that were newly opened by the Government, they have been left idle for a long time.
Among the efforts we are undertaking, first, we want to grant ownership titles to the original settlers who have been established there since the early 1970s, and the process is being handled by the Setiu Land Office to ensure that matters comply with the Terengganu Land Policy. As for the second 400 hectares, they are being developed by a subsidiary of the State Government (TADC) together with local investors, and of course infrastructure issues, especially irrigation and estate roads, are our focus. In 2024, a total of RM459,000.00 was allocated from State Government funds and also Federal funds for the implementation of 17 listed projects. Among the scopes are maintenance of drainage and irrigation, maintenance of pump houses, repair of estate roads, and also maintenance of sluice gates, so that all of these are at an optimum level and can operate properly.
In addition, the State Government, through the JPS (Department of Irrigation and Drainage), has applied for a project to upgrade the main irrigation channel under the Thirteenth Malaysia Plan (RMKe-13), and this application was presented to the Ministry of Agriculture and Food Security (KPKM) on 14 March 2025, with a total cost of approximately RM16 million. Among the scope of works we applied for is upgrading the main water supply in Kampung Jelapang, upgrading the main irrigation channel, and also upgrading the estate roads. These are among the efforts we are undertaking to continue improving the SSR for paddy and rice in our state. Thank you.
Thank you, the Honourable Member for Jabi. Please proceed with supplementary questions.
Supplementary question.
What issues and problems have been identified that resulted in the Kampung Jelapang Irrigation Scheme project, worth more than RM47 million just now, being left idle for so long? Thank you.
Please, Honourable Member.
Thank you for the concern of the Honourable Member for Langkap. The first main issue is that the paddy plots are filled with wood remnants. During the forest clearing work carried out in 2009, the wood remnants were not removed but were buried in the paddy plots, causing the paddy plots filled with wood remnants to be unable to be planted with paddy. And when these wood remnants rot, they form a phenomenon of jerlus soil, causing machinery, whether ploughing machines or harvesting machines, not only to get stuck but to sink completely into the ground. This is the first phenomenon. The second, during the construction of drains for drainage, the levels and elevations of the drains were not made properly, causing water not to flow. Some areas have water overflowing, and some drain areas are bone dry. We also do not know how, in terms of design, something that should not have happened has happened like this. And the third, the phenomenon of deep peat soil, which causes difficulty in using machinery, and finally the water source from Sungai Jelapan, where at high tide the water has an acidic pH. As the village folk say, it is sour and brackish water. So when this sour and brackish water is drawn into the paddy fields, which are acidic soil, no crops will grow well. The alternative route is that we need to find another water source, and the nearest available one is the source from Sungai Nerus, which I mentioned in the application for the Thirteenth Malaysia Plan (RMKe 13) amounting to 16 million. This is among our objectives. As for the issue of wood remnants in the paddy plots, clearing work is being vigorously carried out by Terengganu Agrotech Development Corp Sdn Bhd (TADC) together with the investor company, and we were shocked when we saw the sizes of the wood buried underground, which are log-sized, not just twigs and branches. Thank you.
Thank you, Honourable Member.
Next, I invite the Honourable Wakil Air Putih.
Thank you, Honourable Dato' Speaker. My question is question number one.
What programmes have been implemented to ensure community awareness of the importance of River Conservation and the Environment?
Question number one is combined with the questions from the Manir State Constituency and the Langkap State Constituency. Please, Honourable Member.
Thank you, Honourable Dato' Speaker. Thank you, Honourable Wakil Air Putih, Langkap and also Manir, 3 as shown on the screen. Among the programmes implemented under the Environmental Communication, Education and Awareness Programme, known in English as Communication Education and Awareness, involving the participation of members of the public, government agencies, school students and institutions of higher learning, the private sector, NGOs and industry, are as follows.
First, the Terengganu State Biodiversity Seminar was held on 6 to 7 November 2024. The Terengganu State-level World River Day celebration programme, the World Wetlands Day Celebration Programme, the Setiu Wetlands Festival Programme, the Terengganu Monsoon Beach Cleanup Programme, the State-level Environment Day Celebration Programme on 24 October, the Earth Day Celebration Programme on 22 April, the World Environment Day Programme on 5 June, the World Ozone Day Programme on 16 September, and the Peat Soil Community Programme with communities concentrated in areas of peat soil that frequently burn. And among the measures taken by the State Government to ensure that the marine, river and coastal ecosystems across the whole of Terengganu State are always preserved are as follows:
1. Establishing enforcement of related enactments and acts.
2. Implementing projects and Environmental Conservation Programmes, controlling development in river, coastal and marine areas, and controlling and setting strict standards for the discharge of influence and waste. 3. Education and public awareness programmes, implementing integrated coastal management studies, and implementing integrated river basin management studies.
Thank you, Honourable Dato' Speaker.
Thank you, Honourable Member. Please, are there supplementary questions?
Has the State Government established cooperation with NGOs and also institutions of higher learning in conducting research and conservation of biodiversity? Thank you.
Thank you, Honourable Dato' Speaker. Yes, the State Government, through the Terengganu State Park Management Council (MPTN), always works closely with stakeholders in the conservation of biodiversity in Terengganu State. Among these is through the organising of the Terengganu Biodiversity Seminar 2024, which was held on 6 November 2024 at the Dewan Besar, Wisma Darul Iman, officiated by His Royal Highness the Raja Muda of Terengganu. The Terengganu Biodiversity Seminar 2024 was managed and arranged by the Terengganu State Park Management Council (MPTN) for one day, with the participation of at least 300 people from various backgrounds, namely from the Public Sector, Academia, Private Sector, Non-Governmental Bodies, NGOs, Local Communities, Orang Asli communities and university students, with the aim of fostering awareness of the various contributions to the national agenda and preserving biodiversity, research and conservation efforts, as well as discussions on issues related to biodiversity. And lastly, the Government intends to protect the state's biological diversity. The Terengganu State Government has agreed to gazette Pulau Bidong in the Kuala Nerus District, covering 231.3 hectares and extending one nautical mile from the low-water mark, as a State Park placed under the management of the Terengganu State Park Management Council, while the gazettement process will be coordinated in the near future. Thank you, Honourable Dato' Speaker.
Thank you, Honourable Wakil Kijal.
Honourable Dato' Speaker..
Please, the Honourable Wakil Kuala Berang. Kuala Berang…
Kuala Berang or Telemong?
Telemong…
Thank you, Honourable Member, I thought it was Kuala Berang just now.
I thought it was Kuala Berang earlier…
Thank you, Honourable Dato' Speaker. I very…I congratulate the Government on its efforts to ensure river conservation, but the question is, Honourable Dato' Speaker, we in the areas near this river in Hulu Terengganu, this Telemong River, often experience floods. These floods, if compared with before…before flooding was slow to come because before the river was deep…deep river. Today this river, with the various conservation efforts done by the Government, this river has become very shallow. Very shallow, Honourable, you can feel it, because you are at the coast, Wakil Kijal, we are upstream, very shallow. When it rains a little, the water overflows and floods; it rains a little and there are floods. Because I have done research, I found that due to forest clearing and logging in the upper reaches of these rivers, there is siltation in these rivers. So my question, the problem now is also that when we want to apply for sand extraction, approval is slow, so it is difficult…it is difficult, so it should give, ah, let them take out more sand so that it does not become shallow, to avoid…
Honourable Member's question…
My question is, in other words, please hurry, do not impose many conditions to approve sand extraction, so that our rivers can be dredged of sand and become deeper a bit. Do you agree, Honourable Member for Kuala Berang? Thank you.
Question, please hurry.
Thank you.
That question has strayed far, Dato' Speaker. But never mind. Regarding river dredging, I think, I cannot answer about the utilities underneath, but I can answer about sand.
Okay. It is the Honourable Member's right to answer or not to answer. Never mind.
There is no need to answer that. I will leave it to my friend.
Thank you, Honourable Member.
I can answer one more. Sand, I will answer. Regarding sand extraction, the Honourable Member for Telemong, the State Government has eased and simplified the approval requirements compared with before. For example, the distance between pipes, there are pipes in the water, Honourable Member, previously 1000 metres, now it has been reduced to 500 metres. The distance between bridge pillars, previously 1000 Mr Speaker, now it has been reduced to 500 metres. The distance between entrepreneur A and entrepreneur B, previously 1000 metres, now we have asked for it to be reduced, we have reduced it to 500 metres, except for the tuntung area, where there is a lot of sand, Honourable Member, this tuntung area, we call it a land turtle, hok tu dokleh nok timbang. Now we receive many applications that request less than 500, and that is what is causing the problem. So I ask the Honourable Member, at the JKTD level, not to agree if it is less than 500 metres. If we agree, it will be difficult at the EXCO level to answer. So we ask that hok tu must be, Honourable Member, the area must watch carefully so that our approvals for these sand entrepreneurs can curb or protect the beauty of the rivers across the whole State of Terengganu. That is all, Honourable Dato' Mr Speaker. Thank you.
Thank you, the Honourable Member for Kijal.
Next, I invite the Honourable Member for Bukit Tunggal.
Thank you to the Honourable Mr Speaker. My question number 2-
What steps have been taken by the State Government to improve the administration and service systems of the Local Authority (PBT) in order to facilitate local development, succeed in attracting investors and ensure that problems are resolved more efficiently?
Question number 2. The Honourable Member for Wakaf Mempelam.
Thank you to the Honourable Mr Speaker. Thank you to the Honourable Member for Bukit Tunggal for the question shown on the screen. For the information of the Honourable Member for Bukit Tunggal and all Honourable Members, the State Government has already implemented several steps to improve the administration and service systems of the Local Authority (PBT) in order to facilitate local development and to attract investors to invest in the state. The initiatives that are generally taken are as follows. The first is to strengthen the digitalisation of services. Second, to provide services and human resource development. Third, to improve infrastructure and residents' facilities. Fourth, proactive problem-solving, and fifth, by establishing cooperation between the public sector and the private sector. Thank you.
Thank you to the Honourable Member. We know that when anyone comes to invest, they want profits, and they want those profits quickly, because for businesspeople, time is money, that is different. So when there are delays in project approvals, it will cause them to be stuck in turning over their capital to roll over, with permission. So my question is, is there any proposal at the State Government level for the PBT to create a fast-track system for approvals, especially for projects that are high-impact, large-scale, or public housing projects that require approvals that, please, do not take too long. Thank you.
Thank you, Honourable Member. For the information of the Honourable Member for Bukit Tunggal and all State Assemblymen, as has already been informed, the PBT is always striving to ensure that any process involving any form of project, whatever kind of project, is simplified and any transaction is accelerated, and we often hear about the issue of the effectiveness of the government's service delivery system in efforts to obtain approvals for any progress. Following this, the KPKT, the Ministry of Housing and Local Government (KPKT), has already issued an OSC 3.0 Plus manual in 2020 to replace the OSC 3.0 of 2014, which aimed to ensure uniformity and integrity, in line with the intention to facilitate the services delivered to the people. And efficient and transparent service delivery by the PBT will be a benchmark for the rapid growth of the state's productivity, and will be able to increase investors' confidence, which will directly benefit the economy of the state and also the people. In response to the question on a fast-track system for approval applications at the PBT level, for the information of the Honourable Member for Bukit Tunggal, in 2024 the KPKT has already issued a procedure for implementing the initiative to improve the OSC 3.0 Plus processes and procedures to overcome delays in the approval of development plans, and we very much hope that this improvement is expected to have a positive impact on the PBT and also on investors.
Among the initiatives introduced are, the first is the Industrial Green Lane, IGL, adapted from the E10 initiative implemented by the Kulim Kedah Municipal Council (MPKK). IGL involves applications for industrial development in industrial zones that already have an approved layout plan, where infrastructure, utilities and land are ready for buildings to be erected. Furthermore, the development process in industrial zones can be carried out quickly and nimbly, from the planning stage until the building is completed and operational. Third, permission to operate within a short time is an incentive and attraction for investors, and God willing, the implementation of this initiative is expected to be able to shorten the approval period from 99 days to 29 days. The first, the Industrial Green Lane, the second, Prerequisite, PR, which is an improvement to the processes and procedures for all types of development plan applications, adapted based on the method implemented by the Kuantan City Council (MBK). That is, the development process for all types of applications, including commercial housing, development, mixed development, transport, institutional and public facilities, as well as infrastructure and utilities, can be carried out quickly and nimbly from the planning stage until the building is completed, and it shortens the approval period from 99 days to only 22 days. Apart from that, as a strategic measure, the PBT also has close cooperation with the Malaysia Productivity Corporation or MPC under the MY Mudah initiative, which aims to identify and reduce unnecessary regulations, facilitate application processes and expedite approval of development projects at the PBT level. One of the main approaches in this cooperation is the implementation of E10 approval with the introduction of a fast-track system as well as participation in the MY Mudah programme, and with this E10 approval, the State Government through the PBT is confident that it can further accelerate the application process while maintaining integrity, as well as creativity and compliance with all the regulations that have already been laid down and required. God willing, this measure is also hoped to further enhance Terengganu's competitiveness as a preferred investment destination and ensure that housing for the people and all forms of projects can be expedited for the welfare of the local community and the state itself. That is all, thank you.
Thank you, Honourable Member. We have spent one hour and five minutes on Oral Questions. God willing, Honourable Members who did not have the chance to ask Oral Questions, I will give time tomorrow, God willing, to the Honourable Members for Kuala Besut, Bukit Besi and Sura.
The Most Honourable Dato' Seri Menteri Besar, Honourable Members all, I now suspend the House temporarily and resume at 11 a.m.
MEETING ADJOURNED AT 10.33 A.M.
11.02 A.M.
Debate
The Most Honourable Dato' Seri Menteri Besar, Honourable Members all, the meeting has resumed. Honourable Members all, yesterday we moved the Motion of Thanks for the Royal Address of His Royal Highness the Sultan, and today I invite the Honourable Member who is ready to continue the debate on the Motion of Thanks for the Royal Address of His Royal Highness Tuanku. I invite any Honourable Member who is ready to continue the debate this morning. The Honourable Member for Kuala Berang, please.
Honourable Dato' Yang di-Pertua of the House, the Right Honourable Dato' Seri Ir. Dr. Ahmad Samsuri bin Mokhtar, our Menteri Besar, all Honourable Members, all heads of departments and representatives, all members of the media, observers, gentlemen and ladies.
Thank you, Honourable Dato', for giving me the opportunity to debate the Motion of Thanks for the Royal Address of His Royal Highness the Sultan. I wish to comment on related matters, and I feel there are only six issues that I need to raise this morning.
Firstly, concerning my question yesterday on Federal Road FT 036 Section 89, which was closed 100 per cent due to heavy rain in November 2024. I would like to propose that the Government build a temporary route for the convenience of the public. The project to be implemented is a long-term project, currently still at the study stage, with a cost of nearly 40 million, as was reported yesterday. So it is still a long way off, and it will certainly inconvenience users between Kelantan and Terengganu, especially the residents of Kuala Berang and those commuting to Gua Musang. Users have to take the existing road, which is 80 kilometres longer than going via Aring, and it takes approximately 1 hour of travel. So I hope the Government will build a temporary route as soon as possible, God willing.
Secondly, concerning the issue at the ECRL Station. We are not far off now, three, two years more, not even two years, the ECRL Project will be fully completed, and we need to make preparations to develop the areas surrounding the stations, or what is termed the Transit Oriented Development (TOD) concept.
This development needs to be planned carefully together with various parties between the State and Federal governments, involving MITI, MIDA, the State Economic Planning Unit (UPEN), the Investment Unit, local councils and other agencies. I would like to ask specifically about the ECRL Kuala Terengganu Station, which is at Durian Guling, because the station is close to Kuala Berang and is the largest station in our State of Terengganu. So careful, clear and targeted planning that gives maximum impact on economic and social growth may need land acquisition and so on. Of course, to encourage investors, we provide certain incentives such as investor-friendly land leases, tax exemptions or minimal tax, provision of infrastructure and other incentives. So I would like to know how far this TOD has been implemented specifically for this Kuala Terengganu section. We need to act quickly because time is money.
Thirdly, concerning solar farms. We were informed that the State of Terengganu has a total of 316 megawatts of solar on land of 662 acres, as announced yesterday. So roughly speaking, two hectares of land produces one megawatt. I support the EXCO's statement yesterday that in future, if solar farms are to be built, it is recommended that they be built on idle or unproductive land. We should reserve fertile land for planting crops. Among the alternatives besides on-land solar is floating solar. However, it was stated that the administrative management and other approvals by government agencies take a long time. It was said to take three to five years. So I hope the Government will look at and focus on this problem, which could help the development of our solar farms. There is an Act, namely the Conservation and Development of Environmentally Sensitive Areas Act, or known as ESA Level One. So our side must discuss this seriously with the Federal Government, because if we miss out, we cannot do anything at our large lake, 36 thousand hectares, and we will certainly not get any income and it will be a loss to our state.
Honourable Dato' Yang di-Pertua of the House, another problem at my constituency level, the upstream area, is animals roaming on the roads. Although this issue has existed for a long time, it seems there is still no end to it. Cattle and buffaloes still roam on LPT 2, Federal roads, as well as State roads and district roads. Recently, villagers in my area, in Kuala Berang, died after being hit by cattle, and before that another neighbour of mine had an accident, hitting a group of cattle on LPT 2, causing permanent injury and a total loss of the newly purchased vehicle. So I hope the local authorities and the LPT 2 concession holder will do something. For now, LPT 2 has made improvements and constantly monitors its safety fences. Thank you, but sometimes breaches occur. During the fasting month recently, by coincidence I was travelling on LPT 2 in the northern direction from Kuala Berang to Bukit Gemuruh, near R&R Ajil, and I came across a group of about 20 to 25 buffaloes within a fenced area but close to the guard rail. So this is certainly very dangerous for road users.
I propose that heavy fines be imposed on owners of livestock who allow their animals to roam, and if an accident occurs, a higher penalty should be implemented. There is information that at the district council level they are now supplied with rifles and tranquilliser darts. I hope that during operations, we have at least two rifles; I was informed there is only one rifle. So that's a waste. If we had two rifles, we could shoot two at one time. Hahahah, haaa, such a waste. Training should also be given to shooters or those who want to catch them, especially for buffaloes. Because when you shoot these buffaloes, they collapse, they are heavy, and difficult for us to move. So we need to learn methods of how to catch these buffaloes. So I propose that any animal that enters the boundary of an expressway be deemed to have no owner anymore; in other words, the owner forfeits the right to the livestock, or loses the right. It seems harsh, but it is appropriate to teach owners a lesson. We need to amend the Enactment to be in line with our intention. Allow me a little more time, Honourable Dato'.
Honourable Dato' Yang di-Pertua of the House, I would like to move on to another issue, which concerns another crop pest, namely monkeys, as mentioned by Telemong. Telemong, Telemong, I don't know, I don't want to touch on elephants or wild boars. Monkeys have become a clear enemy in Hulu Terengganu. Planting maize, bananas, fruit, including durian, is no longer safe. The cost of protecting crops has increased, causing farmers to lose heart; there's little profit and it is burdensome. When coconuts are planted, the monkeys pull out the coconut shoots. The costs of building fences, digging ditches, installing electric wires, paying guards, and the time spent controlling monkeys in the orchard are all burdensome. So, of course, this is a burden. Telemong said that during Friday prayers, the people must guard their orchards. Then he said the monkeys are no longer afraid of people. I hope the Government will do something. Pity our people, the rural farmers. I once joined a community group to shoot monkeys, but the results were not as many as we hoped to shoot. Bullets are also expensive, so there aren't many owners of firearms. The one that was old, there's only a few because now there aren't many guns. The ones formerly owned by RELA were withdrawn by the Royal Malaysia Police (PDRM). So I hope the PDRM will give RELA the opportunity once again to own guns. So as I see it, so far the measures taken have not been effective in eradicating this monkey group, and in fact they keep increasing, making them less effective, but the monkeys are very many, right up to the parks, the houses, and the rubbish bins, which causes the victims of monkey bullying to become obvious now.
One more thing, briefly, the sixth issue, concerns flooding in Hulu Terengganu. In Hulu Terengganu, there are two rivers. The important ones are the Sungai Berang, whose headwaters are at Belukar Bukit, and the Sungai Tersat, whose headwaters are around the Sekayu area. These two rivers converge near Kampung Buluh. It can be said that every year there is flooding in Kuala Berang from the overflow of these two tributaries. Before the Kenyir Dam was built in 1984, Hulu Terengganu certainly experienced great floods and they lasted longer. This is the advantage of building a dam, which can reduce flooding and also generate income through electricity production. So I propose that a dam be built on the upper Sungai Berang, namely upstream of Kampung Belukar Bukit, so that flooding can be reduced and we can generate electricity. One more thing, I propose that the riverbeds… ah, this is what Telemong mentioned earlier. Our riverbeds have already silted up because of development over decades. If in the old days people could bring large boats and large junks into Kuala Berang, today it has become shallow. So I propose to the Government and also JPS, let us dredge together, or give this project to whoever will dredge the Sungai Berang, Sungai Tersat, Sungai Po, including Sungai Telemong and also the main river, Sungai Terengganu, so that the water flows quickly and its capacity can hold more water. But although there are disadvantages there, when the water flows fast, erosion and flooding will occur in Kuala Terengganu. But let us work together, let us think together for the common good.
In conclusion, I would like to thank Honourable Dato' Yang di-Pertua of the House. Pray that our state will be Progressive, Blessed and Prosperous, patik, your humble servant, gives thanks for the Royal Address of His Royal Highness the Sultan. Kuala Berang also supports.
Thank you, the Honourable Member for Kuala Berang. Next, there is the Honourable Member. Please, the Honourable Member for Kuala Besut.
Please, the Honourable Member for Kuala Besut.
Honourable Dato' Yang di-Pertua of the House, the Right Honourable Dato' Seri Menteri Besar, Honourable EXCO Members and Honourable ADUN Members. Yang Berusaha Heads of Department, media officers, and respected observers all. First of all, I would like to extend my heartfelt thanks to His Royal Highness the Sultan for the First Meeting of the Third Session of the 15th State Legislative Assembly. To Honourable Dato' Yang di-Pertua, at this sitting, I would like to touch on four important matters concerning the welfare of the people in my constituency and the people of the State of Terengganu in general, namely the drainage project, the keropok industry, and the issue of coconut milk and the need to find new sources of income for the State of Terengganu.
Firstly, the issue of drainage. I would like to record my highest appreciation to the JKR (Public Works Department), the cooperation of the JPS (Department of Irrigation and Drainage), and the State Government for the implementation of two major drainage projects that have long been awaited by residents in the Taman Sri Intan area in Kampung Pachakan. Alhamdulillah, the first project, which has been fully completed around Taman Sri Intan, has shown a positive effect during the monsoon rains that hit at the end of last year. We see that water that usually overflows and stagnates now recedes quickly. This is proof that the efforts made have directly benefited the people. The second project is currently being actively constructed at the state border, namely in Kampung Pachakan. God willing, within approximately three more months, this project is expected to be completed. We hope that with the completion of this project, the long-standing problem of stagnant water can be resolved, and thus improve the quality of life of the local residents. However, I would like to draw the attention of this House to the fact that there is still a drainage system alignment that needs immediate attention, especially in the middle section of the route from Kampung Tok Sabuh, which passes several villages such as Kampung Alor Jejawi, Kampung Alor Teratai and ends at Sungai Naik. I ask the relevant ministries and agencies to conduct a survey and expedite planning to upgrade the drainage system in this area so that it does not continue to be a problem for residents, especially when the rainy season arrives.
Secondly, the keropok industry as an economic and tourism booster. Honourable Mr Speaker, I would like to touch on the keropok industry, which is a small industry that has long been a source of income for many residents in our area. However, I believe this industry cannot be seen merely as a domestic economic activity. I call on the Government to elevate this industry as one of the local tourism products. Many states have already succeeded in making traditional food products a tourist attraction. Why not us as well? The Government also needs to help in terms of capacity building, such as upgrading factory infrastructure, improving packaging design, and providing training and exposure to digital marketing for entrepreneurs. Imagine if these factories were made into clean, cheerful and attractive learn-while-you-visit sites. Not only would it become an additional income for entrepreneurs, but it would also create an economic impact on the surrounding areas through other support such as transport, accommodation and food.
Thirdly, the issue of coconut milk, the proposal for coconut planting. Honourable Mr Speaker, the price of coconut milk has become a national issue. A ceiling price increase of almost 100% is very burdensome for the people today, especially small traders, food producers and daily consumers. This is not just about the kitchen; this is a matter of survival for many ordinary people. I propose that the State Department of Agriculture take proactive steps by opening coconut plantations on a regular and large scale, especially on idle land owned by the State Government. Besides being able to stabilise the supply and price of coconut milk, this step can also open new employment opportunities, especially for the youth who are still largely unemployed. This is also a form of long-term investment that can generate state income, and in addition create a ripple economic effect for the local community.
Fourthly, the need for new sources of income. Finally, I would like to emphasise the urgent need for the State Government to reduce its dependence on petroleum revenue as the main source of state finances.
The reality is that this dependence is no longer relevant in the current economic and political landscape. As we all know, the State Government under the leadership of the Prime Minister now, PMX, has withheld the economic payments that should have been received directly by the State Government. We, the stipulated amounts, have not been disbursed as promised. This is affecting state development planning and ultimately affects the people below. It is time to be bold in exploring alternative sources of income such as the tourism sector, rural development (desa), small and medium industries (IKS), and sustainable management of natural resources. This must be driven seriously, not merely in policy papers, but implemented on the ground with the cooperation of various parties.
Honourable Mr Speaker, in conclusion, I would like to stress that efforts to resolve the basic issues of the people, such as the drainage system, developing small industries like keropok, and finding new sources of income for the state, are not side issues. They are the foundation of progress, welfare and prosperity for the people in our area and throughout the State of Terengganu. I ask that all the matters raised here be given due attention by the relevant agencies. With this, Kuala Besut fully supports the Royal Address of His Royal Highness Tuanku the Sultan.
Thank you to the Honourable Member for Kuala Besut. There is the Honourable Member… please, the Honourable Member for Seberang Takir.
Honourable Dato' Mr Speaker, the Most Honourable Dato' Seri Menteri Besar, the Honourable Members of the State Executive Council, friends, Honourable Members who support the Government, observers comprising heads of departments, and, further, all distinguished ladies and gentlemen. Thank you to the Honourable Dato' Mr Speaker for giving me a short opportunity to join in the debate, to express our gratitude to His Majesty Al-Sultan for graciously attending this House to deliver the Royal Address and thereafter officiating at this sitting.
Honourable Dato' Mr Speaker, Honourable Member, His Majesty has expressed appreciation to the State Government in his Royal Address, for several matters. What I observed, firstly, is that this State Government has reportedly succeeded in driving positive growth in the agriculture sector. Secondly, the State Government has also succeeded in exploring new potential in the renewable energy sector, especially in the solar industry.
So congratulations to the Most Honourable Menteri Besar and the State Government leadership for receiving appreciation and recognition from His Majesty Al-Sultan for the work and efforts that have been carried out.
Honourable Dato' Mr Speaker, what is contained in His Majesty Al-Sultan's Royal Address, which covers various aspects of administration, economic management and so on, shows us that His Majesty Al-Sultan always follows the efforts made by the government and the developments taking place in this state. Alhamdulillah, we have a Sultan who cares about state affairs and also the welfare and interests of the people.
Honourable Dato' Mr Speaker, as the answer given by the Government representative this morning, this morning's session. The solar energy being developed by the government, some of which has been completed, will generate substantial income for this state as a new source, in addition to the sources obtained previously. I have combined what the Government representative mentioned earlier, including all the taxes to the district councils, to the forestry department and so on. From this project, when it is fully completed, it will bring returns of more than RM45 million a year to the State Government. Congratulations, and indeed the Government today deserves appreciation from His Majesty Al-Sultan.
Dato' Mr Speaker, in the previous sitting of the House, the Government stated that the Government also received income from the silica industry. But it is very regrettable that the revenue obtained is very small compared with what has been undertaken, what has been taken, extracted from our earth resources. What was mentioned in the previous sitting of the House was not even one million out of the several hundred acres that have been approved. So what I want to say here is that the Government should, and ought to, in the future look at this matter so that every enterprise, because this is among the revenues we will obtain apart from petroleum and gas. We have silica, we have NREE, we have other mining materials. If we grant mining approvals to certain companies or any agencies that carry it out, but we only get this small return, it is certainly not worthwhile. I believe that with the content or reserves owned by the State Government or Terengganu State, which is said to have the largest silica stock in the whole of Peninsular Malaysia, it is certainly the case that if this is developed well, we can increase income even more. Today we depend solely on petroleum, and Duli Yang Maha Mulia Tuanku has said that the source of petroleum and gas has limits. It will not last forever. So the effort to find new income, as we have mentioned, solar and so on, there must be more. More than one point-something billion we depend on petroleum and gas. If this is not replaced, we will continue to administer under insufficient financial conditions, if that is what we face today and cannot be resolved.
Honourable Dato' Mr Speaker, I think the State Government is well aware that we have various companies under Terengganu Incorporated. We have, as I know, Epic Solar Sdn. Bhd. too. Perhaps if we do it ourselves through our subsidiary, we may be able to produce more than RM40 million or more a year. If we do it ourselves, rather than giving it to others to do, and the area of Tasik Kenyir is large, very large. So certainly there are many opportunities. Today people know Terengganu: Tasik Kenyir produces a large part of the electricity in the Peninsula through hydro. Certainly, if we succeed in developing the solar industry or solar farms, one day Terengganu will also be known as the second largest supplier of electricity after hydro, through its solar farms.
Honourable Dato' Mr Speaker, alhamdulillah, in this sitting, as has been informed, the House has received the largest number of questions from Honourable Members for the Government to answer. And we are aware, as stated by the Speaker himself, that of the 188 questions submitted, most of them revolve around questions relating to infrastructure and public amenities. I think we are not surprised and can understand why this happened. Because many public amenities and infrastructure proposed by the People's Representatives by our community have not succeeded in being implemented because the Government has financial constraints. And I am aware that this is the Government's main obstacle today. In Seberang Takir too, there are many things we have requested the government to do, but they have still not been carried out until today. The ferry jetty at Seberang Takir, this is something that has been happening for a long time. In the past, people from that side came to Kuala Terengganu by ferry boat, before there was the Sultan Mahmud Bridge, before there was the suspension bridge. Today people come to Pasar Payang, and sometimes the parking spaces are full. Some people go to Seberang Takir by ferry boat, the fare is only RM2.00... cheaper than car parking. But this place does not have good facilities. There is also a lot of parking. The access road to the ferry boat jetty at Seberang Takir, people sometimes see it, the road is narrow. There were proposals for land acquisition. There were proposals for a jetty complex to be built there, but until today it still has not been implemented because of financial problems. If I asked one more question today, it might become the 189th question in this House this session.
So Dato' Mr Speaker, apart from that, if I want to mention Seberang Takir, I will take the most important matters. Among them is the road from the Suspension Bridge to Teluk Ketapang. Every monsoon season, big waves occur, and sometimes the sea water brings stones up onto the road. And at one time, every year on the night when big waves occur, this road has to be closed. That is one problem that we really cannot avoid. But what I have been informed, what I have observed, is that some of the stones used as this embankment have already sunk further and fallen, and at the end of the embankment stones some slight subsidence has occurred, and I have received information that some soil has already fallen underneath. So I hope the relevant parties, whether the JPS or the JKR, please look into this problem, do not let it be like the road at Batu Rakit. When the waves keep coming, eventually the road collapses; it keeps rising above but falls down below. So I hope the responsible authorities come and look and ensure that the road does not fall first, with the bottom already hollowed out, before we act.
Dato' Mr Speaker, there is still much I want to say. For me, one or two more minutes, yes. Thank you, Dato' Mr Speaker. Between Teluk Ketapang and the Suspension Bridge, this is a very popular road, a main road. People certainly use it when they want to come to Kuala Terengganu because this road has beautiful scenery, good recreational places, and many people sit there. I was informed the Government also proposed to build a beach football field there. But I do not know when they will do it. I am afraid it will become like the other projects, every time in the House, I keep asking. So I hope the Government can set a time limit. One year more? Two years more? If possible, let it be before the end of this term. Do not let the term end. Seberang Takir, people from outside come, and nothing new has been brought, not even a speck of dust. Let there be at least something new that we can do in this term, at least two or three things. Upgrade the ferry boat jetty at Seberang Takir, and also the recreational area with a beach football field at Pantai Teluk Ketapang. I ask that the Government give some attention to these matters.
Honourable Dato' Mr Speaker, finally, His Majesty Tuanku Al-Sultan also mentioned that this year's budget has been approved with a total of more than RM1.8 billion. What I understand is that last year was also more than RM1 billion. I request that if the Government can inform us of last year's budget, 1.6 or 1.7, how much is it? How much did we actually receive, the actual money that entered the Government's account, and how much did we actually spend and what we spent. This year's 1.8 is the revenue the Government collects through taxes, not taxes, this may be around RM300-RM400 million. The more than RM1 billion, how much do we estimate we will get? Because the budget, the people in the villages, the ordinary people here say, the money is large, the big budget, this can be done, that can be done. So that we can explain to the villagers that the budget is an estimate of income. But because 5% of the money has not come, we can only do this much. That is what we spend. That's why we cannot do this, we cannot do that. So that people can understand easily. And we understand that this problem cannot be solved easily.
That is why Dato' Mr Speaker, we have no other effort. The Most Honourable and the Government representatives have always been negotiating with the Federal Government. But in my view, as a believer, as a Muslim, led by a Government that supports the implementation of syariah and the religion of Islam, we must always and increasingly pray, asking Allah Subhanahu Wa Ta'ala, that this matter be made easier, that this right be returned to the state, our right. A believer, finally, his weapon is prayer. Prayer is the weapon of the believer. That is all. If we ourselves do not feel confident in prayer, it means we have no confidence in our religion. We must be certain in prayer that whatever we ask for, Allah Subhanahu Wa Ta'ala will give. Just like the ustaz and tok guru always say, sometimes we ask that our child be allowed to study, be clever, pass SPM with excellent results, enter university, so he can work well. God gives our child success in education, enters university, SPM only barely adequate, but when Allah Subhanahu Wa Ta'ala accepts our prayer, that child who did not enter university can work, whether in business, doing this effort, doing that effort, he gets a job, and his income is the same as those who work for the Government, the same as the income of those who graduated from university. Many people who did not enter university also have jobs with higher salaries than those who work for salaries after graduating from university. Why? Allah Subhanahu Wa Ta'ala gives to him, perhaps because his parents asked. He did not enter university but can be equal to those who graduated from university. So likewise, when we pray to Allah Subhanahu Wa Ta'ala, perhaps Allah Subhanahu Wa Ta'ala has not opened the hearts of the leaders above to give rights to the State Government. The Government chosen by the people to administer this state, all the resources of this state should rightly be given to this Government that has been chosen by the people to administer and spend as planned. So perhaps if Allah Subhanahu Wa Ta'ala does not grant it in that way, perhaps He will grant it in another way. Among them, like the solar just now, already RM45 million. But RM45 million compared to RM1.4 billion, perhaps still far. But there are still many spaces that can be created. If Allah Subhanahu Wa Ta'ala does not grant the 5% of oil revenue, we hope Allah Subhanahu Wa Ta'ala grants it in another way.
So Dato' Mr Speaker, this is something we must always do. Pray. I think, the others have none. I also sometimes pray always. If I remember, I pray. Never mind. Because this is what we can do. This is our final effort. In the past, a leader often said, why the Government does this, why the Government does that, when he was in the opposition. And finally he recited:
(Surah Al-Imran Ayat 54)
Today we see again, he takes action, he makes excuses, he uses methods, tactics to weaken us. Blocks this, blocks that, opens here, closes there. He plans, but Allah also plans, and we believe Allah is the best of planners. Dato' Mr Speaker, thank you for giving me some additional time, 6 minutes. So 15 minutes. Just like the side over there too. Thank you. I conclude by once again expressing my highest respect. Thank you, with deepest gratitude to Duli Yang Maha Mulia Tuanku, who graciously consented to attend the House, to deliver the Royal Address and officiate at our House on this occasion. Thank you.
Thank you to the Honourable Seberang Takir. Even if I try to stop, the spirit is there, and my friends are also spirited, and the other Honourable Members are listening to it.
We have concluded the debate supporting the Motion of Thanks for the Royal Address of His Majesty. Thank you for the Royal Address of His Majesty the Sultan. So we will continue this sitting with, I will invite the Government side to deliver the winding-up of this debate. I intend to end all the debate from the Honourable Members on the Government side today and we will give room for the winding-up by the Most Honourable Menteri Besar tomorrow. So the Honourable Members on the Government side can keep to the appropriate time today. Insya-Allah, next I invite the Honourable Kota Putera to begin the winding-up session today.
Thank you, Mr Speaker, for giving me the opportunity to begin the winding-up session.
Honourable Member Mr Speaker, the Right Honourable Dato Seri Ir., Menteri Besar of Terengganu, fellow members of the State Executive Council, fellow Honourable Members, heads of state and federal departments, members of the media, observers, and all the ladies and gentlemen I respect.
First, allow me to express my loyalty by humbly paying homage and expressing gratitude for the Royal Address of His Royal Highness Sultan Mizan Zainal Abidin Ibni Al-Marhum Sultan Mahmud Al-Muktafi Billah Shah, delivered at the Opening Ceremony of the Third Session of the 15th State Legislative Assembly last Monday.
I give thanks for the Royal Address of Your Majesty, which touched on the Government's efforts and initiatives to increase new revenue generation through the New Income Terengganu Plan, "New Income Terengganu" with permission, by harnessing the potential of sustainable energy resources, namely solar, and green technology, as well as increasing cargo capacity at the East Pier of Kemaman Port, which will certainly add economic value to the State in reducing the State's dependence on petroleum revenue.
On behalf of the State Government, I will always strive to look at the potential and opportunities for the future of Terengganu Darul Iman, insya-Allah. I also extend my thanks to all Honourable Members who took part in the debate on the motion to give thanks for the Royal Address of His Royal Highness Sultan Mizan Zainal Abidin Ibni Almarhum Sultan Mahmud Al-Muktafi Billah Shah, delivered at the Opening Ceremony of the Third Session of the 15th State Legislative Assembly.
On this occasion, it is not too late for me to extend Selamat Hari Raya Aidilfitri greetings and Maaf Zahir dan Batin to all Honourable Members, heads of departments and their representatives, government officers, and observers in the House, as well as those watching the live broadcast, with the speech . Apart from that, I also wish to record my highest appreciation and thanks to the agencies and Government-Linked Companies (GLCs) that drive my portfolio, including State Government agencies and Federal Government agencies that work hard to ensure my portfolio and also the New Income Terengganu (NIT) committee move towards achieving targets and objectives. My special thanks go to the PTG team led by Dato' Ishamuddin, the UPEN team led by Dato' Tun Ahmad Faisal, the Invest team, PMINT team, MIDA team, ECR team, TSIS team, MBI team and TI team, and many more agencies and subsidiaries that I cannot mention in full this time. They are like an engine. Without an engine that functions well, of course the vehicle cannot move to the intended destination. Thank you all.
Honourable Member Mr Speaker, in my observation, no fewer than nine Honourable Members have debated and put forward their proposals, comments and views, which involved the Digital Economy, New Income, Trade, Industry and Green Technology portfolios. Based on the issues debated, there are several main points raised by Honourable Members throughout the debate period, which I will try to touch on in the winding-up speech this morning.
Before I begin the answer or touch on the matters mentioned and raised by Honourable Members, I would like to share the latest developments regarding industrial and investment progress that is being actively pursued by the State Government. For the information of Honourable Members, the State Government will soon have a liquefied natural gas (LNG) regasification terminal that will make history as the first LNG terminal in Malaysia developed by a private entity, namely not PETRONAS. We have named this project RGT, which is Regas Terminal. It will operate under the third party access (TPA) framework located in the Telok Kalong Industrial Area, Kemaman. Under this scheme, the terminal will use the Peninsular Gas Utilisation (PGU) network with PETRONAS's approval for the final distribution of gas to industries and utility customers on the East Coast and surrounding areas. This project is also currently at the final stage of obtaining an operating licence from the Energy Commission, alongside finalising the environmental implementation and compliance aspects (EIA) and infrastructure requirements. One important strategic partner in this project is Menteri Besar-Incorporated (MBI), which will be a co-holding entity in this investment, and Eastern Pacific Industrial Corporation Berhad (EPIC), which will provide the project site for the terminal facility and is also involved in providing port facilities including jetty access, related utilities and marine services for shipping activities. Development work for this project is expected to commence in the first quarter of 2026, and full commercial operation is targeted for the first quarter of 2028.
Honourable Member Mr Speaker, the State Government, in joint venture in the silica industry, has strengthened close cooperation with the Terengganu Silica Consortium. Several meetings and sessions have been held to coordinate action at the company level and also the State Government so that our direction aligns with the direction of the company or TSC. Alhamdulillah, the meetings were well received by the Terengganu Silica Consortium and we obtained several matters which the Government should also get mileage from the activities that have been carried out. I would like to mention
May I interject, Honourable Member, Mr Speaker?
Please, Honourable Member.
From this plan, if before the Honourable Member mentioned that from one tonne we get only how much, so through this new effort, this new plan with the company we promised, which we are negotiating, the one tonne the Honourable Member mentioned earlier at RM70, how much can we get from that? Thank you.
Please, Honourable Member.
Yes. Thank you, Seberang Takir. That's right. I would also like to interject, Mr Speaker. When I presented in the previous sitting, the Deputy Speaker, Seberang Takir, was sitting up there at the time. It was mentioned when I gave my account, I was referred to as the opposition. Until a video clip was made and played by outside opposition. At that time I was not acting as an opposition. We in the Government are transparent in discussing what has happened. We first put forward the problem statement and we have solutions, but in my explanation of the problem statement I was obstructed or referred to as an opposition representative. I ask Members of the House to broaden our thinking. We must say things that, though bitter, are needed to solve the problem. It is not an issue of opposition or government. So thank you for the interjection just now. I will mention matters related to this, but not as specifically as before. I did not prepare a text because the previous one is already past, finished, and that text has been submitted for us to see as the House Hansard.
So, continuing from what I wanted to say earlier, the Terengganu Silica Consortium is not new, it began in 2015, and after that there was no close cooperation between the company and the Government. Alhamdulillah, we are trying to strengthen it, and as I mentioned earlier, we have received several inputs which the State Government should experience in what is happening in Terengganu. Among them is the use of the first electric dredging vessel not only in Malaysia, not only in Southeast Asia, but in the world. It is here in Terengganu State, operated by Terengganu Silica. This should make the State Government proud, because there is technology that is Zero Emission. If we talk about green technology, this is the only implementation of mining where we do not use fossil fuels, but use electricity. So I want to raise this matter in this honourable House so that we feel proud that this technology is already in our state. I congratulate Terengganu Silica on the efforts made.
Secondly, the production in Terengganu State, in the Marang area, is high-quality silica in its class, namely Ultra-Purity Industrial Silica or with its abbreviation (UPS), or easily called Ultra Pure Silica with purity as high as 99.9%, with a very low iron content of 10 PPM per million, Parts-Per million up to 80 PPM, for specialised industrial uses such as the manufacture of foldable phone screens, computer screens, television screens, and also producing Cristobalite, which is the main material for producing high-technology glass.
Mr Speaker, following from these outputs, from the earth of Terengganu State will come what was mentioned as Cristobalite. For the understanding of the House, Cristobalite is a form of mirror that can be shaped with aerodynamics. Currently, if we look at square solar panels, and if we want to place them on top of houses, on rooftops or in fields, they may spoil the view. But with Cristobalite, we can convert silica boards into something more attractive. Likewise, if in.. Time is up, Mr Speaker, I have not yet touched on those matters, House. I ask for a little additional time because there are several other matters we want to touch on for the information of the House. Namely, Cristobalite can be used to make car roofs, and car roofs today, electric car roofs, cannot be made because there is no material like this. They must be charged. But with Cristobalite, the car roof can be made aerodynamic, and that very roof can also be solar. These are the materials within the earth of Terengganu that we must truly appreciate.
Mr Speaker, Honourable Member Manir did touch on the takeover of Kemaman Port. But as we know, the Ports Act 1963 is a Federal law that gives absolute power to the Federal Government to establish a Port Authority and administer the operations of the National Main Port. Eastern Pacific Industrial Corporation Berhad (EPIC) through its subsidiary, Konsortium Pelabuhan Kemaman Sdn. Bhd., has signed a Privatisation Agreement between the Government of Malaysia and the Kemaman Port Authority, starting from October 2006, and was granted a concession for 30 years and automatically extended by 30 years. That means 66 years, we can operate Kemaman Port until 2026. So to take over entirely, the State Government cannot, it has no power to take it over. I think Honourable Member Manir understands this matter, but what he mentioned concerns improvements that we can make. That is within the scope we have. So, insya-Allah, perhaps the EXCO for Infrastructure will touch on the expansion of Kemaman Port later. Regarding silica as well, before I go too far, Kuala Berang. Eh, no. Sorry, I have strayed. Let us go straight to the Silica Industry raised by Honourable Member LSR. Haji Zaharudin bin Zahid, Representative for Bukit Tunggal, regarding State Government revenue from silica mining and the State's direction towards the CCUS Bill.
For the information of the Honourable Member, the revenue obtained by the Government through silica mining and industry in 2024 totalled RM1,0069 46.88. That amount was calculated at the old royalty rate of RM1.50 per metric tonne. For this year, 2025, we have approved a new royalty rate of 5% of sales value, or with a calculation of approximately RM4. So with this increase in royalty, insya-Allah, it will raise the amount from RM1.06 million to RM6.529 million. The calculation of this new rate is still at the negotiation stage between licence holders and the PTG office and the Department of Minerals and Geoscience Malaysia Terengganu to be finalised, because that is how it is when we put forward a figure, industry players give feedback saying it is high, but in the discussions being held now, we look at that situation because we see world demand is somewhat, although now silica is somewhat declining, there is still demand. So that is where discussions are held and, insya-Allah, we will finalise it in the near future, insya-Allah. This revenue is obtained through the lessees who have been granted approval, namely under Permint Granite Sdn. Bhd. at Bukit Senyamok, Mukim Abang, Dungun, and also the Terengganu State Heritage Trust Board, which is operated by the Terengganu Silica Consortium that I mentioned earlier.
In the meantime, the effectiveness of enforcement to ensure that the revenue that should be paid to the State Government by these silica operators depends on several factors involving enforcement actions, monitoring, and also the readiness of operators to comply with regulations. We have received feedback from the Pejabat Pengarah Tanah dan Galian (PTG) that they are currently short of staff and have requested that the Government consider increasing those staff. Insya-Allah, we will consider it later. Mr Speaker…
Interjection, Honourable Member.
Ya.
There is an interjection from Kemasik.
Oh yes. Please.
Thank you, Mr Speaker. Honourable Member for Kota Putera. My only proposal is that, instead of the method of collecting concession revenue, would it not be better if we could use the production sharing contract approach, as exemplified by PETRONAS itself? If it follows concession sharing, the revenue is as mentioned by the Honourable Member for Kota Putera. But I am confident that if the approach we take through a production sharing contract, the revenue or income to the State Government through a State Government company, will be higher and certainly more sustainable, more long-lasting…
Kemasik, Kemasik, please go ahead.
Okay. Thank you, Kemasik. I strongly agree with that view, and we have also taken steps in that direction. That is our cooperation with Terengganu Silica, and now, for the information of the House as well, Terengganu Silica is opening up space for the Government to participate in production, and likewise, in this latest method, we are taking an approach for the Government through GLCs to be involved in production, and insya-Allah it will happen on the Northern Terengganu side in the near future.
Only two minutes, Honourable Member.
Berapa minit?
Dua minit.
Ha, already read it and already mentioned it, hmm, where to find this. Okay, I will be brief on the CCUS matter because it is quite long, as it is still at the very early stage at the Federal Government level, and close cooperation is being carried out, and we are following every development that takes place. Perhaps the Honourable Member can ask in the next House sitting. Regarding the Honourable Member for Hulu Besut who touched on digital achievement in rural areas, the State Government, through the State Government subsidiary Terengganu Telecommunications Sdn. Bhd. (TCOMM), always works together with federal agencies, namely MCMC (Telecommunications and Multimedia Commission), in efforts to improve internet access within our state. So for the information, and we have zoomed in because of this question, this question from Besut, we have seen that internet coverage achievement in the Besut Parliament has actually reached 99.93%, which has taken place there. The only thing that happens is that perhaps some people feel there is no internet, perhaps the mobile internet coverage experienced by the public is poor because of several locations that still need to be improved, and also due to their subscription packages. Perhaps their subscription packages are not sufficient for them to access the internet, or also the telephone device used and the settings on the telephone used. So such matters, perhaps we can also take into account. But I would like to take this opportunity to mention to the Honourable Member for Hulu Besut as well, if there are complaints from the people, please obtain the location at a place where you can hand it over to me or the Portfolio office so that we can zoom in and see what problems they are experiencing.
Can the Honourable Member summarise?
Okay, I will summarise what the Honourable Sura mentioned regarding green hydrogen, green hydrogen. For the information of us all, MBI also wishes to explain that this project is at an early stage in Terengganu State. Yesterday the Honourable Member said, just said, that it cannot yet be seen. This matter does not happen by holding a meeting tonight; tomorrow it becomes a reality. Because it goes through several processes, and in the process we are going through now there is a prefeasibility study (PFS) that has been completed. After the PFS is completed, we submit it to the company to carry out the FS. In this FS a period of 12 months is given and, God willing, it will end in March 2026, and only after that will we finalise this programme. So we are moving in that direction, we have taken one step towards it, and God willing, with the cooperation of everyone, we will move towards effectiveness and success later, God willing. So I think that although there is much more I have to cut short, there is just one more question, regarding Land Office fees, from the latest achievement of NIT that was mentioned by Seberang Takir in the previous session. The NIT is reported every time the State Legislative Assembly (Dewan Undangan Negeri, DUN) sits, and I will take a little time, Mr Speaker, to state that the latest achievement we have recorded from one of our strategies is the review of Land Office and Mining fees (Fi Pejabat Tanah dan Galian), which we started in January 2025 just recently. Up to April 2025, the State Government has received Land and Mines Office (Pejabat Tanah dan Galian, PTG) fee payments amounting to RM9.404 million, compared with RM5.440 million in the same period in 2024. This means an increase of 3.964%, equivalent to 42% of the increase in Land and Mines Office fee payments, which is the result of the NIT initiative that we have successfully implemented with the cooperation of the parties, particularly the PTG itself.
Mr Speaker, in closing, I once again thank all the Honourable Members for their views and inputs shared throughout this debate which touched on matters relating to my portfolio, thank you.
Kota Putera begs to second, thank you.
Thank you, Honourable Kota Putera, who answered and wound up the debate in a period of about 40 minutes too. I would like to curb it, but there are so many issues that cannot be denied. However, I want to remind all Honourable Members of the House about Standing Order 46(18): a Member is not permitted to mention another Member by name. Next, I invite the Honourable Cukai.
Thank you, Mr Speaker, the Most Honourable Dato' Seri Ir. Menteri Besar of Terengganu State, all members of the State Executive Council, colleagues, Honourable Members, Heads of Departments and agencies,
civil servants and government staff, colleagues from the observers and media, and direct observers, online, ladies and gentlemen.
Mr Speaker, first and foremost let us together express our gratitude to the Divine for all the blessings He has bestowed upon us. Thus we are able to be together in this honourable House to debate the Royal Address of His Royal Highness Al-Wathiqu Billah Sultan Mizan Zainal Abidin Ibni Almarhum Sultan Mahmud Al-Muktafi Billah Shah. Your servant respectfully extends gratitude to His Royal Highness the Sultan of Terengganu for the Royal Address at the official opening of this sitting of the State Legislative Assembly. Indeed, His Majesty's Address is very substantive, reflecting Your Majesty's concern and wisdom in ensuring that the welfare of the people and the progress of the state continue to be safeguarded. Your servant humbly pays homage and records the highest appreciation for Your Majesty's attention to all state affairs and the interests of the common people. I was very interested in His Royal Highness's command that attention be given to exploring new resources and investment so that Terengganu continues to be competitive in facing the challenges of the future. In line with that, the development of the East Coast Rail Link (ECRL) project and the implementation of TOD at six main ECRL stations are a catalyst for exploring new resources and investment. The construction of the ECRL is not merely a transport infrastructure project; it is a national strategic initiative that will transform the socio-economic landscape of the east coast states, with a distance of more than 600 kilometres connecting the east coast with the west coast. This project will make the movement of goods and people faster, safer and more cost-effective. More importantly, the construction of the ECRL opens up the potential for exploring new economic resources. Rural and interior areas that were previously given little attention are now open to investment and economic development. Through the ECRL route, we can encourage the development of local industries including modern agriculture, eco-tourism, Small and Medium Enterprises (PKS), and the development of high-impact industrial areas.
Mr Speaker and Honourable Members all. To ensure the benefits of the ECRL are maximised, six main stations have been identified for TOD development. TOD is not only about building railway stations, but developing the surrounding areas with an integrated approach
involving residential, commercial, office and recreational areas. This will form new hubs of economic growth that are sustainable, modern and inclusive.
This development is believed capable of significantly attracting domestic and foreign investment. With first-class infrastructure facilities, a strategic geographical location and the support of government policy, the areas around TOD will become the focus of investors in the housing, logistics, retail and services sectors. This is in line with our aim to diversify the state's economy and reduce dependence on traditional sectors. Most importantly, local people will not be marginalised. On the contrary, they will be the main beneficiaries. The construction and operation of the ECRL and the development of TOD will generate thousands of job opportunities in various sectors. The infrastructure developed will improve access to education, health and housing facilities. We are also confident that with the availability of employment opportunities and increased local economic activity, the migration of youths to big cities can be reduced because opportunities are now available in their own homeland.
Mr Speaker, in answer to the question of the Honourable Kemasik: the proposal to build and complete a mosque and other related works at Kampung Baru Kertih, Kemaman, Terengganu, accommodating 2,000 worshippers. The State Government has approved a re-tender to complete the abandoned works of the Kampung Baru Kertih Mosque, Kemaman, as per the decision of the State-Level Stalled Projects Meeting on 8 September 2024, where the project continues by using the remaining ceiling of the existing project and the scope of work is only up to a cost of RM4.5 million based on the most minimal functionality. JKR (Public Works Department), together with UPEN (State Economic Planning Unit) and the Religious Affairs Department, have held several series of meetings to coordinate the scope of work based on the approved project ceiling. For information, the new planning schedule is as follows:
1) Letter of Intent: 13.04.2025 2) Invitation to Tender: 24.04.2025 3) Tender Closing: 25.05.2025 4) SST Letter: 24.06.2025
5) Date of Site Possession: 08.07.2025 6) Completion Date: 30.12.2026 7) Construction Period: 18 Months
God willing. The problem of the stagnant Sungai Paloh in Kertih because the river mouth is blocked. To overcome the problem of Sungai Paloh in Kertih, the State Government through the Terengganu State Drainage and Irrigation Department (JPS) will study the periodic maintenance works, including dredging the mouth of Sungai Paloh, Kemasik, as was carried out in 2024. This implementation is a mitigation measure to reduce the risk of flooding in the affected areas, especially during the northeast monsoon.
In answer to the question of the Honourable Bukit Tunggal: the issue of gazetted river reserves causing economic restrictions on people for development. The State Government takes note of the issues that have arisen following the gazetting of river reserves under the National Land Code dated 14 October 2010. Accordingly, the State Government is prepared to review the gazettement, particularly for specific cases involving implications for development or the welfare of the people. This review will involve checking the area of the gazetted river reserve, the suitability of the location based on current field conditions, as well as consideration of technical and environmental needs. A case-by-case approach will be taken to ensure a balance between public interest, safety, environmental conservation and individual land ownership rights. The State Government also works closely with technical agencies such as the Drainage and Irrigation Department (JPS), the Land and Mines Office (PTG), and the Local Authority in reassessing the existing gazettement. Any amendment or exemption will be made prudently, based on transparent policy and supported by strong justification. Is there any development regarding the proposal to enlarge and upgrade the Buluh Gading Bridge, Kuala Nerus? The proposal to enlarge and upgrade the Buluh Gading Bridge has been included in the scope of work of the Project to Upgrade the Road from Kubang Jela to Batu Enam Roundabout (Phase 2). The project application was made under the Twelfth Malaysia Plan Rolling Plan 1 to 5 (RMK12RP1-5), but so far it has not yet received approval. The proposal to implement this project will be relisted in the development project proposals under RMK13RP2.
Project to Upgrade Road Bridges and Bridges on Route FT003, from Kampung Pulau Rusa to Batu Enam Roundabout to the Junction of Route FT065 Sultan Mahmud Airport, Kuala Terengganu, Terengganu (Phase 2: Kg. Kubang Jela to Batu Enam Roundabout). The total cost of the project is
RM480,979,095, including the construction cost of the Buluh Gading bridge amounting to RM39 million. This is a continuation of the upgrading of Federal road FT003 (Durian Burung to Pulau Rusa), which was completed in 2011. The implementation of this project will provide a smoother and more controlled traffic flow, thereby increasing safety and comfort for road users. Scope of work of the proposed Project to Upgrade the Kubang Jela to Batu Enam Roundabout Road:
1. Upgrading of the existing two (2) lane road to four (4) lanes along 4.0 kilometres.
2. Replacement of the Buluh Gading Bridge, which is more than 61 years old.
If this project application receives approval in the upcoming Malaysia Plan (RMK), the construction of the new bridge will be planned more carefully and comprehensively. In the design process, the needs of all parties who…
There is an interjection from the Honourable Manir. Do you want to give way?
Mr Speaker, Manir also needs a new bridge that connects with Wakaf Mempelam. I think it had previously been included in RMKe-13, but recently it seems to have dropped out somehow, I don't know why. Can you give an explanation? If possible, please reinstate it. Thank you.
Thank you, Honourable Manir, please continue.
Thank you, Manir.
God willing, the Centre recently requested additional projects and we have sent them back. Mr Speaker, in answer to the question from Batu Rakit regarding breakwaters. Based on the outcome assessment, this project is expected to have a significant impact on the local community, with several main outcomes that have been identified. First, it will provide protection to more than 1,000
residents involving nearly 400 houses as well as 10 stalls and wakaf from the continuous threat of coastal erosion and wave battering. In addition, this project also provides protection to approximately 300 fishing boats from damage caused by large waves, thereby helping to ensure the economic continuity of the fishing community. Apart from that, this project also involves the protection of existing roads for a length of five kilometres, which are important routes for local residents, thus ensuring that access remains safe and uninterrupted. And God willing, JKR and JPS will play a role in this matter.
As for when the damaged road due to the northeast monsoon (MTL) in the Kuala Nerus area on Route T145 Jalan Mengabang Telipot Batu Rakit, Sections 5.9 to 6.5, Kuala Nerus, Terengganu, which has suffered serious damage due to coastal erosion caused by the MTL. This phenomenon not only causes collapse of the road and embankments along the route, but also affects the lives of local residents and the safety of public infrastructure. To address this issue, repair works for the road and embankment collapse began on 8 April 2025. This project is expected to be completed by 7 October 2025 and includes preliminary works, reclamation, embankment protection, road surfacing, installation of road furniture and utility diversion. The cost of this project is RM4.9 million. Regarding assistance for victims of coastal erosion disasters, Wang Ehsan Disaster Assistance is a financial aid provided by the government to victims of disasters such as floods, storms, landslides and others. Its purpose is to ease the burden of victims in facing losses caused by disasters. The State Government, through the Terengganu State Flood Disaster Management Committee, will forward the application to the National Disaster Management Agency (NADMA) to assist these coastal erosion victims.
What plans does the Government have to overcome the frequency of pipe bursts and occurrences around Kampung Maras…
Honourable Member, someone wants to interject… Please, Batu Rakit…
I want to ask a little about the earlier answer: the project started on 8 April, but at the site I can still see the effects of the ground movement..
Please, Honourable Member.
Okay, thank you. It is true that the effects are not yet visible at the site, because the preliminary work is being carried out at the workshop. Once all those installations are complete, they will be installed as quickly as possible, insya-Allah. We hope this project will be completed before the MPL this year, insya-Allah.
Regarding the frequency of pipe leaks in Kampung Maras and Kampung Wakaf Catur, the cause of the frequent burst and leaking pipe cases around Kampung Maras and Kampung Wakaf Catur is high water pressure and the condition of the ageing and dilapidated Asbestos Cement pipes.
This issue can be resolved through the planned activation of a new tank in early May 2025 and the implementation of a pipe pressure management programme by SATU. For the long-term solution, these critical pipe alignments will be identified for the purpose of replacement with new pipes, insya-Allah.
Improvement of the Rate and Frequency of Meeting Allowance Payments for JPKK. The State Government is always committed to ensuring the governance of the Village Development and Security Committee (JPKK) is at the best level. One important aspect in supporting the role of JPKK is the provision of an appropriate meeting allowance to recognise their contribution and active involvement in local development matters.
The latest proposal to align the rate and frequency of JPKK meeting allowance payments with the rates paid by the Federal side is a step towards standardisation and improvement of the existing system. Under this proposal, it is suggested that the frequency of meetings be increased from six times to twelve times a year. This step will not only strengthen the effectiveness of administration at the grassroots level, but also ensure that the issues of the people can be addressed more quickly and efficiently. However, this proposal requires greater financial commitment. It is estimated that an additional allocation of RM5.38 million is needed to cover the increase in the rate and frequency of allowance payments involving a total of 1,055 JPKK throughout the State of Terengganu. This amount is not small and requires serious consideration by the State Government.
Accordingly, the State Government welcomes this good effort at improvement and supports its basic principle. However, any changes involving public finances must be carried out prudently and take into account the current financial capacity. In this regard, the State Government will review the proposal submitted and will thoroughly study the need to increase the frequency of meetings as well as the financial impact that will be borne.
Honourable Dato’ Yang di-Pertua, regarding the answer to the question from Air Putih, a multipurpose hall. The State Government notes and supports the application concerning the need for a multipurpose hall located in a strategic area that is not easily flooded, to be used as a Temporary Relief Centre (PPS) during floods. This proposal is very timely considering that the Air Putih area, including around Binjai, is among the areas affected every time the monsoon season arrives. The absence of a suitable and comfortable relief centre facility causes difficulties for residents, especially the elderly, women and children.
Accordingly, the Government, through the District Office and the District Disaster Committee, will review and assess suitable locations for the construction. This study will take into account safety aspects against flood risks, accessibility for local residents, and the readiness of supporting infrastructure such as electricity, water supply and access routes. If a suitable site is identified, the proposal for construction will be submitted for consideration and district development planning, and an appropriate allocation will be applied for from the Ministry of Rural and Regional Development for this application.
Electricity Supply in Mak Lagam. The State Government, through the TNB CSR, has approved RM311,800.00 to cover the cost of connecting electricity supply to the Ribat Al Asyraf Islamic Study Centre, Mukim Banggul, Kemaman. In line with the State Government's wish to develop Air Putih, TNB supports and notes the construction of a TNB substation at Jalan Mak Lagam at Simpang Binjai Air Putih to create an impact on the development of the area. TNB is in the process of verifying and re-evaluating the actual cost for project planning based on the current year.
Further discussions with the Kemaman District Office and relevant officers will be held regarding this matter.
Alternative Road Mak Lagam Cheneh via FT237 Section 8 and 9, Air Putih village road, Kampung Batu 14, and also the Air Putih, Pokok Sagu and Tebak roads. The State Government is always committed to strengthening infrastructure development for the welfare of the people. In line with that goal, a project identified as having high potential in improving basic amenities and stimulating local economic growth will be submitted for consideration by the Federal Government. Through the State JKR of Terengganu, the application for this project has been formally raised under the Thirteenth Malaysia Plan Second Rolling Plan (RMK13 Rolling Plan 2). This step is in line with the need to ensure that every proposed development project receives an appropriate allocation as well as approval from the Ministry of Works.
Is there still a long time left, Honourable Member?
There are four more pages… may I?
Three minutes, Honourable Member…
Three minutes? Insya-Allah. Clean water supply to the villages of Perasing, Jabur and Bukit Berapit: the Cherul Water Treatment Plant Upgrading Project, Kemaman, with an additional production capacity of six MLD, has been approved under the Twelfth Malaysia Plan Fifth Rolling Plan, under the Ministry of Rural and Regional Development. The current status is the process of appointing consultants. The scope of work includes the installation of new 155mm MuPVC pipes and related works on the Bukit Berapit and Perasing RTB land, which has also been allocated in this project.
Higher Education Institutions in Air Putih. The State Government notes the need to establish a higher education institution at IPTA. The State Government is always committed to expanding access to higher education for the people, especially the children of Terengganu. In line with that, the proposal to set up a higher education institution in the Air Putih area is a very welcome proposal and is being seriously considered. The State Government requests the Ministry of Higher Education and related agencies to study the need, the suitability of the location, and the potential fields of study that can be offered so that they are in line with current industry needs and the economic development of the state.
Enlargement of Felda Neram 1 Clinic. The enlargement of Felda Neram 1 Clinic cannot be carried out because the existing land area of PITA is sufficient. The land in that area belongs to FELDA. The proposal to build a new clinic on the clinic's land at Sungai Pergam, Hulu Jabor, was presented at the Kemaman District Development Action Committee Meeting, but the site was not suitable because it is located far from the local community centre. Accordingly, the Kemaman District Health Office is making efforts to identify new land with a minimum area of three acres for the construction of the said Health Clinic. Once a new site has been identified, the Kemaman District Health Office will submit the application for the construction of this new clinic through the Terengganu State Health Department for approval for the construction of a Malaysian health clinic.
Answering the question from Hulu Besut. At present, regarding the Keruak Gunung Bongsu road project, or Keruak Tujuh Puteri. At present, both projects are not listed in the priority list under the First Rolling Plan of the Thirteenth Malaysia Plan (RMK13). However, the proposal to build a new road from Felda Keruak, Besut to Chucoh Puteri Kuala Krai has been raised to the Ministry of Rural and Regional Development by the State JKR of Terengganu under RP1 RMK-13. As for the Proposed New Road Construction Project from Pekan Keruak at Jalan Gunung Bongsu, Hulu Besut, Terengganu, this project has also been raised to the Ministry of Rural and Regional Development by JKR Terengganu during the Fifth Rolling Plan of the Twelfth Malaysia Plan.
Answering the question from Kuala Berang: the TOD for Kuala Terengganu is still at the early planning stage. Based on the latest general information, the TOD for the ECRL Kuala Terengganu station has been identified as part of the government's long-term plan to encourage transit-based development around the main stations. However, the latest status may still be at the discussion stage between the PBT, MRL and also PLANMalaysia. The provision of special areas or amendments to local plans, land suitability assessment, coordination and land ownership, as well as local communities. No large-scale physical development has yet been officially reported to have started at the Terengganu station area, Kuala Terengganu. The State Government will take note of and is committed to efforts to develop the TOD at the ECRL Kuala Terengganu station.
Construction of a new dam and river maintenance. The State Government notes and takes seriously the flood issue that affects the well-being of the people in the affected area. Based on the preliminary study carried out by JPS (Department of Irrigation and Drainage), dam construction is one of the effective long-term measures to control water flow during heavy rainy seasons and to reduce the impact of floods. However, before any dam construction can be implemented, several important aspects need to be given attention. The first is an environmental study to ensure that the proposed dam does not have a negative impact on the ecosystem and local life.
The second is financial allocation. Dam construction requires a large financial allocation. The State Government will hold discussions with the Federal Government to obtain funds and technical support.
The third is engagement with the community. The Government will ensure that the views of local residents are taken into account, especially those directly involved with the proposed local area. As an initial step, JPS has applied for an allocation to carry out a detailed study, detailed design and economic feasibility for this project. In addition, short-term measures such as deepening the river, building flood barriers and strengthening the riverbanks are also being actively implemented in the Telemung river area. The State Government is committed to continuing to address the flood issue holistically and continuously for the welfare of the people and the sustainability of the environment.
Regarding the construction of the temporary road FT036 Section 89 at Padang Arin. The State Government, through the State JKR, has raised an application to set up a temporary road to connect Kelantan and Terengganu at a cost of nearly RM10 million. However, this cost is seen as inefficient by the Ministry of Works, which has suggested that permanent repairs be carried out at a cost of RM36 million.
The second is financial allocation.
Dam construction requires
Answering the question from Honourable Manir: the Kemaman Port Enlargement Project, Terengganu, is being actively implemented. This project aims to increase the port's cargo handling capacity from 7 metric tonnes per year to 33 million metric tonnes per year. The current status of the Kemaman port enlargement is at the stage of preparing the EIA report. That is all, the answers I can present. Those who are not satisfied, please come to my office.
Dato’ Yang di-Pertua, I would like to ask a little something.
That's all, Honourable Member. Thank you, Honourable Chukai. Next, I invite the Honourable Ajil.
Honourable Dato’ Yang di-Pertua, the Most Honourable Dato' Seri Menteri Besar, Members of the State Executive Council, friends, colleagues of the Honourable Members, government officers and all those present. First of all, let us together express our gratitude and be fortunate to be given the opportunity in this month of Syawal to debate. May this debate be blessed by Allah Ta'ala, and on the occasion of the Address of Gratitude to His Royal Highness Tuanku Sultan, who continues to be the sovereign umbrella shielding the people and this state. I very much thank Tuanku, and thank also the Most Honourable Menteri Besar and the leadership of the State Government, the ADUN (State Assembly Members) and the Members of Parliament. Thanks also to the staff who implement government policy, beginning with Dato' SUK, government administrative officers, support groups, staff at the Community Service Centres, JPKK and the people who continue to support and uphold the administration of the State Government, and we see now that the people's mood to continue supporting the PAS Government in Terengganu remains fresh and can be strengthened from time to time.
Honourable Dato’ Yang di-Pertua, welfare agendas that the people have experienced, such as the free motorcycle licence provision, pensions for eligible citizens, third-class ward charges at government hospitals, assistance for feasts through the Walimatul Urus Perdana programme, emergency and disaster aid, and assistance to chronically ill patients through Tabung Darul Iman, are among the welfare agendas that the people can feel. The people do not merely see, but they feel the benefits of the work carried out by the Government and the excellent administrative groups of the Government, which have increased performance in the previous elections, and perhaps because of this excellent performance we are burdened by the Federal Government in not channelling sufficient and comfortable budget allocations. However, the efforts of the State Government and also the Central Government to always move in step in this administrative agenda, insya-Allah, will be realised from time to time with the help of Allah Subhanahu Wa Ta'ala, and the welfare agendas, which are among the landmarks or signature of the Welfare Portfolio, and which can be felt by the grassroots people, will continue to be planned and implemented, insya-Allah, even amid the financial pressure being faced. Alhamdulillah, we are still able to protect and give priority to welfare for groups, especially persons with disabilities (OKU), orphans, single mothers, the elderly and the poor, who are not neglected and continue to be served through the agencies and departments under this portfolio.
On this occasion, I express my deepest appreciation and gratitude to the agencies at both Federal and State levels that continue to give solid commitment in helping and making the agendas planned under my portfolio, the Welfare, Family Development, Women and National Unity Portfolio, a success. Thank you to the Department of Social Welfare, thank you to the Royal Malaysia Police, thank you to the Road Transport Department (JPJ), thank you to the Ministry of Health Malaysia (KKM), thank you to the Family Development Foundation (YPK), thank you to LPPKN (National Population and Family Development Board), thank you to JPW (Department of Women's Development), thank you to the Department of Orang Asli Affairs, thank you to USWA, the National Welfare Foundation, the National Unity and Integration Department (JPNIN), and thank you also to the Secretariat of Tabung Darul Iman, which continues to give solid commitment in realising the people's aspiration to enjoy a more comfortable life. From the aspect of Women and Family Development, the Government has set up USWA as one of the government agencies to assist in women's development in order to strengthen the agenda of empowering women through education, skills training and career advancement opportunities at various levels.
In addition, the agenda of strengthening women's development is also implemented through the Family Development Foundation in the Jaya Diri Programme under YPK, and our awareness that women are among the pillars in the development of this state and also this country, therefore surely the cooperation between the Department of Women's Development and the agencies implementing development regardless of sex and gender will be empowered from time to time
Yang Berhormat
untuk membantu
Yang Berhormat
rakyat…
Honourable Ajil, there is an interjection from
Representative of the Permaisuri, I have a small question.
Sila.
Thank you, Honourable Dato’ Yang di-Pertua. In the State of Terengganu, I see that there are also many new Muslim converts who are active, as we see at the PERKIM centres and so on. Is there any provision for them under the portfolio of the Honourable Wanita to assist in guiding their economic development as new converts? Thank you.
Thank you, Honourable Permaisuri. If I am not mistaken, PERKIM falls under Dakwah. However, we do not marginalise muslimat or women in PERKIM, and I forget the date in early May, but I have a programme together with PERKIM Terengganu, insya-Allah. Thank you, Honourable Permaisuri.
From the aspect of Unity, the State of Terengganu, as we know, with its population capacity and Malay population of about 94 percent, does not face, does not have, and is not confronted with unity issues that could threaten the security of the state. Terengganu is among the states that serve as a model of unity in Terengganu, and through my portfolio we have strengthened this unity work, in which races other than Malay are invited to come down together to join in welfare programmes. It is not merely through programmes for Chinese New Year celebrations or Deepavali that we come together; we have indeed realised the beautiful foundation of unity when the Malay, Indian and Chinese communities go into the field, go to the target groups to attend to various races in welfare aspects. This is one of the interesting developments in which we strengthen this unity agenda, not only during festive seasons.
Honourable Dato’ Yang di-Pertua and all members of the House, I will speak only briefly this afternoon, as I may be drowsy, hungry, and furthermore, no issues have been raised by my friends. I believe all my friends are satisfied with my portfolio. Thank you.
Thank you, the Honourable Member for Ajil.
Thank you to all the Honourable Members, Heads of Departments and my beloved observers. We adjourn this House for now.
The Right Honourable Dato' Seri Menteri Besar, Honourable Members, this House will resume at 2.30 p.m. We adjourn with the Tasbih Kaffarah and Surah Al-Asr.
THE HOUSE IS ADJOURNED AT 12.55 P.M.
2.33 P.M.
The Right Honourable Dato' Seri Menteri Besar, Honourable Members. The sitting is resumed. We are still in the session for the Winding-Up on the Motion of Thanks for the Royal Address. I now invite the Representative for Alur Limbat to deliver the winding-up. Please proceed.
Deputy Speaker of the Terengganu State Legislative Assembly, the Right Honourable Dato' Seri Menteri Besar, members of the State Executive Council, government officers and observers. I do not forget the journalists on duty today. The word of Allah Subhanahu Wa Ta'ala:
Meaning: "And say (O Muhammad): Act (as you will), for Allah will see your deeds, and so will His Messenger and the believers, and you will be returned to the All-Knowing of the unseen and the seen, and He will inform you of what you used to do."
I raise the words of Allah Subhanahu Wa Ta'ala as the opening of my speech, because this verse carries great meaning for us who bear the trust of leadership and public policy. It calls us to act and to work hard, because all our efforts will be observed by Allah Subhanahu Wa Ta'ala and by the faithful people. Therefore, within the context of this Entrepreneurship Portfolio, all policies, programmes and allocations are not merely administrative responsibilities but also acts of worship for which we will be held accountable. With deep respect, I humbly offer my tribute and express my gratitude to His Majesty the Sultan of Terengganu for the Royal Address at the Opening of this Sitting of the Terengganu State Legislative Assembly. Your Majesty's address is very meaningful
showing Your Majesty's concern and wisdom in safeguarding the well-being of the people and the progress of the state. I, together with all Members of this House, record our highest appreciation for Your Majesty's concern for all matters of state administration and the interests of the people. I extend my highest appreciation to all the Honourable Members who took part in the debate in this Sitting.
Alhamdulillah, I also thank the Honourable Members for being very proactive, who submitted 188 questions and debated them within three days. Many questions could not be raised today due to limited time, including those from me today and yesterday. My questions could not be fully addressed in this House, and the debates raised, apart from the 188 questions submitted by BBC, were very vigorous this time.
Deputy Speaker, the changing economic landscape after the pandemic requires us to move from relying solely on cash assistance to economic empowerment through entrepreneurship. Upholding the Command of His Majesty the Sultan, who has graciously agreed that the state should focus on three sectors. First, the strengthening of agriculture and the agro-based industry. Second, the exploration of new resources and investment, and third, the sustainability of tourism. Therefore, entrepreneurship is the next and very significant phase, because by strengthening agriculture we can produce more agro-entrepreneurs, and by strengthening tourism, which is increasingly strong in the State of Terengganu, we can produce tourism entrepreneurs who will become new economic sources for the people of the State of Terengganu.
Through the entrepreneurship approach, emphasis can be placed on the use of modern technology, product innovation, the development of value chains and the strengthening of marketing strategies. This effort must be supported by the development of highly skilled human capital, especially involving the participation of the young generation and the B40 group, so that they too can play a role in this new economic ecosystem. First, the increase of the income of the people of the State of Terengganu. The State Government, through the Terengganu Entrepreneur Development Foundation (YPU), also plays an important role in helping to increase the income of the people of Terengganu through several programmes that have been and will be implemented.
Among the programmes that can increase the income of the people of the State of Terengganu are those in the form of finance or entrepreneurial activities. To help entrepreneurs expand their businesses and subsequently increase their income, the government, through YPU, has disbursed financing facilities to entrepreneurs, whether they have been long in business or are new to entrepreneurship, through the Terengganu Sejahtera Entrepreneur Fund (Tabung Usahawan Terengganu Sejahtera), or in short, TUGAS. Interest-free loans, NO RIBA, have successfully been disbursed with a total exceeding RM2 million for the year 2024. To date, more than 5,000 entrepreneurs have received such financing facilities since it was implemented in 2019. Apart from financial financing, YPU has also helped entrepreneurs through academic, promotional and product development programmes, which have greatly helped Terengganu entrepreneurs and the people of Terengganu. Helping entrepreneurs is by increasing their income. Helping the people is by creating new job opportunities to help their businesses. I would like to add a little to the answer to the question of the Representative for Buluh Gading, regarding the steps and efforts of the State Government in helping persons with disabilities (OKU) to generate their income.
Among the steps that have been taken, first, the provision of a Course Scheme for persons with disabilities (OKU), namely the Terengganu Di Hati Caring Fund Scheme. This scheme provides a maximum grant of up to RM5,000.00 with the concept that 80 per cent is financed by the Terengganu Entrepreneur Development Foundation (YPU) and 20 per cent by the entrepreneur. This fund aims at the purchase of machinery and equipment to help OKU entrepreneurs expand their businesses. YPU also provides various business financing schemes for entrepreneurs, including for persons with disabilities (OKU). Among them, I will summarise the Terengganu Business Improvement Financing Scheme (SP3T). Second, the Siti Khadijah Fund (TSK). Third, the Overseas Workers Financing Scheme. Fourth, the Terengganu Online Financing Scheme (SPINT). Fifth, the Mobile Truck Financing Scheme (SPMT). Sixth, the Terengganu Business Capacity Improvement Programme (T'CAP). To date, through the Terengganu Di Hati Caring Fund Scheme, YPU has helped a total of
103 entrepreneurs, with allocations disbursed amounting to RM444,095.72.
As for the young generation, to increase their income or create economic opportunities through the agriculture sector and the tourism sector, various programmes have been implemented by entrepreneurship agencies to develop the young generation into entrepreneurs. The Terengganu Entrepreneur Development Foundation (YPU) itself has implemented the Terengganu Sejahtera Young Entrepreneur Programme, which so far has shown 70 per cent success, with the participation of 200 young entrepreneurs who have now succeeded in creating economic opportunities for that group while also helping to overcome the problem of unemployment. SME Corp with the Young Entrepreneur Seedling Programme (TUBE), MARA with the PUTRA Programme, Agrobank with the Agrotani Programme for agricultural sector entrepreneurs, and various other programmes for young entrepreneurs have also helped the young generation create income and subsequently drive the economy of the State of Terengganu.
Deputy Speaker, on matters relating to Pasar Payang as a Marketing Centre and a Marketing Centre for small and medium industry (IKS) products. The new Pasar Payang, alhamdulillah, has become the latest iconic landmark of the State of Terengganu and a focal point for tourists visiting Terengganu. It began operating at the end of 2024 and is a destination that is able to attract tourists to buy various products based on the State of Terengganu. It is a one-stop centre for obtaining products produced by Terengganu entrepreneurs. It covers batik, songket, handicrafts, traditional food, IKS and various other products. Therefore, as the agency responsible for helping Terengganu entrepreneurs, the Terengganu Entrepreneur Development Foundation (YPU) should play an important role in making Pasar Payang a marketing hub, either directly or through today's method, which is digital. For the information of the Deputy Speaker and all present, YPU has from the beginning taken the initiative to make Pasar Payang a marketing hub for Terengganu products, by holding discussions with the Kuala Terengganu City Council (MBKT) to organise promotional programmes for Terengganu IKS products periodically, involving various products by Terengganu IKS entrepreneurs, and, God willing, will be implemented from time to time.
Deputy Speaker, a proposal for improving Terengganu entrepreneurship. The Terengganu Entrepreneurship Development Secretariat, or PEUTER for short, is a combination of 40 agencies involved in entrepreneurship programmes and plays a role in coordinating all entrepreneurial activities in the State of Terengganu. The meeting is held four times a year for the purpose of reviewing, evaluating and also improving any entrepreneurial activities that have been or will be implemented by the agencies. Through PEUTER, all programme improvements will also be discussed in that meeting. Therefore, all activities and programmes implemented will focus more on effectiveness and benefits to entrepreneurs. It is also to avoid duplicate programmes being implemented by other agencies. The success of the PEUTER programme can be seen through the achievement report of the programmes to be presented each year. This is where improvements will be made to programmes that are assessed as having failed.
The Buy Muslim First (BMF) Campaign. Buy Muslim products, or buy Muslim products, is a campaign that is highly encouraged. It is a campaign that has long been implemented not only in Terengganu but also throughout Malaysia, targeted at the Muslim community. In Terengganu this campaign has long been implemented by organising product promotion programmes for products produced by entrepreneurs, which are generally known to all as products of Muslim entrepreneurs. However, the number of key products, such as toothpaste and several other necessities, are not produced by Terengganu IKS entrepreneurs. Nevertheless, several other products such as the making of yellow noodles, wantan noodles, carbonated drinks, mineral water, tofu, tempeh, fish cake (fish balls) and several other products have been able to take over the market and are given first choice by Muslim consumers in Terengganu, and their factories are in Terengganu. For information, the my chocolate product is also marketed by Terengganu entrepreneurs by becoming the main distributor of that product. The success of this campaign can be seen from the increase in production of the products produced by those producers. God willing, the BMF campaign will be held continuously.
Finally, I would like to touch on the increase of halal certification. Halal is a campaign that has been implemented continuously by the Government of Malaysia. This is because the market value of halal products is extraordinary, with an annual trade value reaching billions of ringgit a year. The State Government, through the State Economic Planning Unit and also the Terengganu Entrepreneur Development Foundation, as well as the Terengganu Religious Affairs Department, have been given the role of increasing the number of halal producers in the State of Terengganu through the establishment of the Terengganu Halal Council. The role of the Terengganu Halal Council is to coordinate the planning and implementation of state halal policy through the involvement of various stakeholders. As of January 2025, only 317 producers hold halal certificates, of which six of them on that list are slaughterhouses out of more than 9,000 that hold halal certificates across the country. This effort will, God willing, be continued with high targets set for this year. The responsibility of increasing the number of halal producers will be carried out from time to time through the Terengganu Halal Council by organising programmes that can increase Terengganu halal producers. Among the programmes that will be implemented in series are the Halal Awareness Workshop and the Terengganu Halal Awareness Seminar. Apart from that, YPU will also become a one-stop centre for halal reference, through officers who play a role as advisers and references for obtaining halal certification. Besides that, continuous cooperation will be carried out with the Halal Development Corporation (HDC), the centre for intensifying awareness and the importance of obtaining halal certification. I believe that with this effort, the number of those obtaining halal certification will increase, God willing. I am confident that with the cooperation of all parties, the state administration, implementing agencies, NGOs, entrepreneurs and the people, Terengganu can become a leading state in the development of Islamic economy based on entrepreneurship in halal products and IKS. Let us continue to move forward with determination, resolve and reliance upon Allah Subhanahu Wa Ta'ala for the well-being and prosperity of us all. That concludes my winding-up.
The Representative for Alur Limbat seeks to support the Royal Command of His Majesty the Sultan.
Thank you, Representative for Alur Limbat.
I now invite the Representative for Tepuh.
Thank you, Deputy Speaker,
The Right Honourable Dato' Seri Menteri Besar of Terengganu, all Honourable Members of the State Executive Council, fellow Honourable Members, Heads of Departments, fellow observers, fellow members of the media, and all beloved attendees. Alhamdulillah, together we record our gratitude to Allah Subhanahu Wa Taala, who has granted us permission to assemble on this occasion to serve the interests of the people of the whole State of Terengganu through the First Meeting of 2025. On this afternoon, I express my thousand thanks to all the Honourable Members who took part in the debate yesterday and today. Some of them touched on my portfolio, either directly or indirectly. The Terengganu State Government is always committed to upholding the development of youth, sports and NGOs. Recognising the important role of the youth as the catalyst of the nation's future, and the potential of sports and NGOs as drivers of unity and social development. A comprehensive and far-sighted strategic plan has been developed. The Strategic Direction Plan for the Terengganu Youth Development, Sports and NGO Portfolio 2025-2030 is a continuation of the Terengganu Youth Development, Sports and NGO Portfolio Direction Plan 2021 to 2025. This continuity is important to ensure the strengthening of previous achievements as well as improvements based on the assessment and feedback of the previous plan. This plan covers the development of Rabbani Youth, the continuation of sports excellence and the empowerment of NGOs in line with the six strategic pillars of the Terengganu Sejahtera Master Plan (PITAS) 2030. I deliberately mention PITAS 2030 so that it receives the attention of all government officers, so that this jointly prepared strategic planning agenda is not neglected by any government drivers. This plan covers 5 objectives, 25 strategies and 103 programmes that have been planned. A series of workshops has been completed to ensure this plan can be fully achieved, with the vision of making the children of Terengganu the nation's most outstanding asset.
Deputy Speaker, all Honourable Members, there are several matters raised by Honourable Members during yesterday's debate. Among them is what was mentioned by Kemasik regarding the Kuala Terengganu Hockey Stadium, which is under the management of the Kuala Terengganu City Council.
For the information of the Honourable Member, for the first phase of repair works, MBKT has obtained special approval from the Terengganu State Treasury on 26 February 2025, for the disbursement of an allocation amounting to RM500,000.00 for the purpose of infrastructure maintenance and sports facilities at the Kuala Terengganu Hockey Stadium and related works. The letter of acceptance will be issued in mid-May 2025, God willing. For the time being, the State Government has no plans to build a second hockey stadium at the Gong Badak Sports Complex. Nevertheless, for the hockey training field, we give serious attention and have already made efforts to undertake repair works at the Terengganu State Sports Complex. Apart from the works I mentioned under the Kuala Terengganu City Council just now, we have also raised this matter with the Ministry of Youth and Sports (KBS). A visit by KBS officers to monitor the location of this hockey stadium was carried out on 25 March 2025, to examine what is needed in future repair works, God willing. In a meeting with the Right Honourable Prime Minister in Kemaman the other day, this matter was also raised among the priority projects that, God willing, will receive attention from the Federal Government.
Deputy Speaker, Honourable Representative for Tepuh, just for the record, apart from the roof for which we have received an allocation, please also give attention to the floodlights and the turf, lah, because until now, matches held in Terengganu must all be started early due to the floodlights not functioning fully. So we cannot schedule competitions late, at 6 or 6.30 p.m., which causes many programmes that should have been carried out to be unable to be implemented. For the attention of the Honourable Representative for Tepuh.
Thank you, the Honourable Member for Kemasik. That matter is under attention, and that is what I meant in the meeting with the Ministry of Youth and Sports (KBS) that we conveyed earlier. Returning to the incentive for the Terengganu Hoki Team. Firstly, the State Government takes this opportunity today to extend congratulations to the Terengganu Hockey Association, which has led the team to win the treble this season by winning the Malaysia Super League (MSL), the Piala Sumbangsih and the TNB Premier Cup 2025. Congratulations to the Terengganu Hockey Team.
The State Government has also received an incentive proposal from the Terengganu Hockey Association, God willing, I will not take this opportunity to announce it.
Insha-Allah the State Government will consider the application made by the Terengganu Hockey Association. This proposal paper will be tabled at the State Executive Council Meeting in the near term, insha-Allah.
Honourable Deputy Speaker, allow me to answer several oral questions that were not answered in time today and also yesterday. I was quite anticipating but did not get the chance to respond. Almost this morning from Kuala Besut, but that too slipped away without getting the opportunity to answer the question.
The Honourable Member for Ladang mentioned the community sports programmes planned by the State Government to raise awareness of healthy lifestyles among the people of Terengganu. Among our plans, the first is the Terengganu City Night Games, through six series of events involving nine sports so far. The first series has already been held in February last and, insha-Allah, the second series will be held this month.
Second, the Terengganu SUTERA Sports Festival, an inter-district sports carnival, which is scheduled to be held in September. Fit Is Sunnah, involving activities such as Fit Run, Fit Walk, Fit Ride and Fit Hype. Sports programmes for everyone at the State Assembly constituency level, horse riding and archery. These are all among the plans that we have already arranged in 2025. For the information of the Honourable Member for Ladang, also related to the athlete development programme implemented under the State Government's planning through the Terengganu State Sports Council (Majlis Sukan Negeri Terengganu) is the Tunas Harapan Programme. This programme is implemented using allocations under the Terengganu State Sports Council. The programme involves athletes aged 9 to 12 years, and there are 6 types of sports implemented, namely weightlifting, pencak silat, petanque, athletics, lawn bowls and gymnastics. Two districts are involved, namely Marang for gymnastics and Kuala Nerus for pencak silat, petanque, athletics, lawn bowls and weightlifting.
Second, the talent programme. This programme is implemented under the State Government using assistance allocations in the form of grants channelled by the National Sports Council of Malaysia (Majlis Sukan Negara Malaysia). It involves athletes aged 13 to 17 years. There are as many as 18 types of sports, which I feel there is no need for me to detail in this space.
Third, the reserve programme. This programme is implemented under the State using assistance allocations in the form of grants channelled by the National Sports Council of Malaysia. It involves athletes aged 18 to 21 years, with as many as 18 types of sports involved, and 19 state training centres have been established for the state reserve programme, covering Kuala Nerus, Kuala Terengganu, Setiu, Dungun, Marang and Besut.
Minute 0:32:32 I would also like to touch on the question raised by Kuala Besut regarding the issue of social ills among young people. For the information of the Honourable Member, the State Government is very serious about examining this matter and is endeavouring to adopt various approaches. Among the main plans is, firstly, the LEGASI programme (Lepak, Cergas dan Santai). This programme is a relaxed approach specially designed to attract the participation of youths, encompassing outdoor activities such as hill climbing, book discussions, and knowledge-sharing sessions with celebrity preachers. This approach not only opens up space for healthy entertainment but also instils religious and moral values in participants. Secondly, the youth sports programme, among the programmes organised include the Penalty League, Sahur Futsal, Fit Is Sunnah. The other day, when we organised Sahur Futsal, we also held a quiz on Ramadan and also opened a Al-Fatihah recitation clinic for futsal participants who attended at that time. This initiative combines elements of physical fitness with religious values and togetherness, simultaneously building youth identity through healthy and positive activities.
Thirdly, the beach cleaning programme that involves volunteerism. This programme involves the participation of school students, Terengganu youths and undergraduates. In gotong-royong activities to clean up beach areas, in addition to educating about the importance of protecting the environment, and encouraging volunteer spirit and cooperation between the younger generation.
These are among the several matters that have been implemented by the State Government, and alhamdulillah we will continue to strive to ensure that the agenda of youth empowerment and development will continue to be strengthened. Once again I would like to take this opportunity to extend my thousand thanks to all the Honourable Members who have touched on matters relating to my Portfolio, and to those who did not touch on it, I also extend my thanks, because you have given a good, sharp and critical view of the State Government in order to see the interests of all the people of Terengganu State, from Kemaman to Besut.
I hope the explanation relating to this Portfolio can resolve the questions that have arisen. With deep respect, I humbly express gratitude for the Royal Address of His Royal Highness the Sultan of Terengganu on the occasion of the official opening of the State Assembly sitting this time. Your humble servant and all Members of the House respectfully submit our highest appreciation for Your Majesty's attention to all state affairs for the benefit of the people. Tepoh humbly begs to support, thank you.
Thank you, the Representative for Tepoh, although one minute of the time has already been used as well as possible. Next, I invite the Representative for Wakaf Mempelam to deliver the winding-up.
Thank you, Honourable Deputy Speaker. Thank you to the Most Honourable Dato' Seri Menteri Besar, fellow members of the State Executive Council, Honourable State Assemblymen, the Heads of Departments, the Observer Agencies, and all who are present in the House, including those attending virtually.
Thank you to the Honourable Deputy Speaker for the space and opportunity given to me to take part in the winding-up of the debate on the Royal Address of His Royal Highness the Sultan of Terengganu for the First Meeting of the Third Session of the Fifteenth State Legislative Assembly, which sat from 14 to 17 April 2025. I also extend my highest appreciation and thanks to all the State Assemblymen who actively took part in the debate on the Royal Address of His Majesty the Sultan of Terengganu. The views, suggestions and criticisms put forward are very valuable and will be given due attention. On this occasion, let me also extend Selamat Hari Raya Aidilfitri greetings to all Muslims in this country, especially to the Honourable Members of this House and the civil servants who continue to be committed to carrying out their trust with full dedication. Maaf Zahir dan Batin.
Honourable Deputy Speaker, through the Royal Address of His Majesty the Sultan, three main areas were highlighted, namely consolidation, agriculture and agro-based industry, exploration of new resources and investment, and the sustainability of tourism. In efforts to realise this aspiration, the Local Authorities (PBT) play an important role as implementers of policy and facilitators at the grassroots level. For the area of consolidation, agriculture and agro-based industry, the PBT also play a role in assisting and facilitating all processes for approving development plans related to agro-based industry. In the area of exploration of new resources and investment, the PBT also play a role in creating a conducive and investor-friendly environment. This includes expediting complicated licensing processes and ensuring that commercial and industrial areas are always well managed and safe. Meanwhile, in the area of tourism sustainability, the Local Authorities are also responsible for ensuring that the cleanliness and beauty of tourist areas are always maintained. This includes the maintenance of public areas such as beaches, parks and heritage sites. The PBT also provide complete and comfortable basic facilities for tourists such as public toilets, signboards, walkways and car parks. The Terengganu Bersih aspiration being practised by the PBT Terengganu will also become one of the attractions for tourists, insya-Allah.
Honourable Deputy Speaker, through the 12th Malaysia Plan, RMKe-12, several project approvals have already been given to the PBT of the State of Terengganu for economic development and proportionate progress. Honourable Deputy Speaker, in this sitting, various issues have been raised by the Honourable Members during the debate. I would like to record my highest appreciation and thanks to all the Honourable Members who have paid attention and raised various issues for the welfare of the people of the State of Terengganu. Accordingly, allow me to take this opportunity to explain and also inform the House on the matters that have been touched upon by the Honourable Members.
The first matter is from my friend, the Honourable Member for Buluh Gading, who touched on the issue of vape or e-cigarettes, as it has been raised several times, and this issue has also been mentioned and shared by several other Honourable Members, such as the Honourable Member for Ladang, the Honourable Member for Sura, and the Honourable Member for Pengkalan Berangan. For the information of the House, the use of vapes or e-cigarettes in Malaysia has become an increasingly worrying public health issue since they first entered the market in 2015. Although initially seen as an alternative to conventional cigarettes, vapes have created a double burden on smoking habits, including misuse, especially among the young and youths. The trend of vape use is increasing among teenagers and the productive group. A study conducted by TECMA in 2016 and the ADH 2017 adolescent health study show that although there was an overall decrease among teenage smokers aged 13 to 17, from 27% to 22.44%, the percentage of vape users among female teenagers increased from 2.6% to 5.3%. This is proof that vape use has attracted the interest of groups who were previously exposed to conventional cigarettes. This problem becomes more serious when vape users have also grown among individuals aged 20 to 49, the most productive group in society, a situation which frustrates efforts to reduce the overall smoking rate and raises concerns about the long-term impact on health and the economy of the nation.
Honourable Deputy Speaker, recognising this situation, the State Government has decided that no business licences shall be approved for vape businesses within the PBT areas of the State of Terengganu. For the record, the PBT have also issued notices and compounds to these unlicensed businesses as follows. In 2023, a total of 8 notices involving 81 compounds were issued. In 2024, also 8 notices involving 77 compounds, and in 2025, up to March, 8 notices involving 25 compounds. In 3 years, a total of 24 notices and 183 compounds were involved. Enforcement actions against the prohibition of vape sales taken against sales carried out without a licence are seen as unable to demonstrate the seriousness of the State Government in combating vape sales. Accordingly, to demonstrate the seriousness of the State Government on this issue, a proposal to prohibit vape sales at business premises is being refined, taking into account the following matters.
First, maintaining the current implementation by not approving business licences for all premises and traders of electronic cigarette or vape products, and in the future, in line with the by-laws currently in force in the respective PBT. Second, if businesses still open and operate without a licence, the PBT will enforce the law by seizing and confiscating the goods sold, and any enforcement in accordance with the by-laws and regulations in force, including imposing compounds and fines. And insya-Allah, a MMKN paper has already been prepared and is only waiting for the time to be tabled at the State Executive Council (MMKN) Meeting, and insya-Allah also, next week I already have a schedule to meet the Terengganu vape traders' association at this Wisma so that we can discuss and find the best solution.
Honourable Deputy Speaker, next, the ADUN from Buluh Gading also raised the issue of people's housing in Kampung Jeram. For the information of the Honourable Member, the Jeram People's Housing Programme or PPR Jeram has been approved under the third Rolling Plan, RMKe-12, with a cost of RM42 million. The current status of this project is that KPKT is in the process of submitting an application for budget approval with the Ministry of Economy related to the amendment of the original cost from RM42 million to the current cost of RM47 million, and this cost amendment is due to the rebranding carried out by KPKT of the People's Housing Programme, originally PPR. The PPR Programme was subsequently renamed the People's Residency Programme, or PRR, which involves additional components as follows: first, the installation of a solar system at the hall, the construction of a guard post, the construction of a mini library, an additional two air-cond points in each house, an additional two water heater points in each house and an additional table top in the kitchen in each house. So, this amendment is what caused the delay that occurred. Until now, the approval of allocation from the Ministry of Economy has not been obtained. If approval is obtained, KPKT anticipates that the tender advertisement will be issued at the end of 2025, that is this year, insya-Allah.
Next, the ADUN for Ladang also raised the issue regarding the Moreh Festival during Ramadan. The Moreh Festival was held throughout the month of Ramadan recently, and the organisation of this Moreh Festival is also to boost the local economy and help the finances of small traders to continue growing. The organisation of this Moreh Festival, apart from food business activities, was also enlivened with entertainment activities such as busking. In considering the application to organise this Moreh Festival, the PBT have taken several proactive steps to ensure that the event complies with the regulations in force, such as the Entertainment and Places of Entertainment Enactment 2002, the Entertainment and Places of Entertainment Regulations 2003, the Hawkers and Peddlers By-Laws of the Local Authorities, and complies with the Terengganu State Entertainment, Performance, Culture and Sports Guidelines. Thank you to the Honourable Members who have raised this issue. Insya-Allah, an engagement session will be held involving the Buskers Association, the Tourism, Culture, Environment and Climate Change Committee, the Dakwah Propagation and Shariah Empowerment Committee, and the interested parties, so that we can revisit the best current and future implementation methods. Apart from that, the Dakwah Propagation and Shariah Empowerment Committee is also currently reviewing the Guidelines for Entertainment, Cultural Performances and Sports in the State of Terengganu, insya-Allah. These Guidelines will be used by the PBT to consider any application for entertainment activities.
Honourable Deputy Speaker, the ADUN for Ladang also raised the issue of the Bukit Besar Market, or PBB. The Honourable Member for Ladang raised two issues concerning this PBB: first, the maintenance of the market building including the toilets, and second, the vacancy of the benches and also the shop lots. I am pleased to inform that MBKT has been approved an allocation of RM500,000.00 by KPKT for the Upgrading Works of Bukit Besar Market, Jalan Pasir Panjang. The scope of this upgrading work includes repainting, repairing the toilets and other related works, and at this time the MBKT is in the process of procurement for the implementation of the upgrading works of this market building. With regard to the vacancy of commercial space in this market, MBKT is also very aware of this issue and MBKT has issued advertisements several times to fill the vacant commercial space. MBKT has also taken the initiative to offer roadside traders the opportunity to move their businesses into this market. Nevertheless, the response we have received has been very unencouraging, and among the main causes of the vacant spaces in the market and in other markets is the emergence of traders who operate illegally on the roadside. The MBKT and the government need to be careful in tackling this issue because the traders involved in this business are largely from the B40 group and also Muslim bumiputera. At the same time, the Government and MBKT are also aware of the impact of this illegal business operation, including in terms of road usage safety, toilet and environmental cleanliness, the vacancy of legal commercial spaces in PBT-owned markets, and also the effect on PBT revenue following the vacancy of these commercial spaces. Therefore, insya-Allah, the PBT will hold a special discussion to find the best solution to resolve this problem.
Honourable Deputy Speaker, on this occasion, I would also like to inform that the government is always sensitive to the demands and proposals of the traders at Payang 1 Market. We have received complaints from the traders of Payang 1 Market that, after they moved to this Payang 1 Market, several undesirable things happened, for example, when it rains, the rain spray enters very strongly into their business premises, including the walkways available at Payang 1 Market, which has resulted in fewer visitors, as well as the need for staircases at several corners around the Payang Market to make it easier for buyers to go directly from the bottom to the top without having to use the main staircase, which may be located far from the corners around it.
Therefore, Alhamdulillah, MBKT will build three staircases and build a structure to protect against rain spray and heat, and MBKT has spent RM450,000.00 for this purpose in the first phase of construction. Alhamdulillah, KPKT has also approved an allocation of RM750,000.00 for the second phase, insya-Allah. Hopefully, with this initiative by MBKT, it can further beautify and facilitate the arrival of tourists to Payang Market, and at the same time, Alhamdulillah, an allocation of RM500,000.00 has also been obtained from KPKT for the upgrading of Batu Enam Market, also RM500,000.00.
Honourable Deputy Speaker, next, my friend from Manir mentioned the issue of solid waste separation. The State Government is also not exempt from responding to the nation's aspiration towards the implementation of a circular economy, and the PBT is an agency that plays a very important role in ensuring recycling practices through, first, the provision of recycling bins, recycling centres and the implementation of programmes together with the community. Based on studies, non-recyclable waste such as certain plastics, toxic waste and e-waste that is not properly managed can contribute to pollution. Therefore, several initiatives have already been carried out by the PBT to reduce the issue of this non-recyclable waste, such as the Free Market organised in the Dungun district by the Dungun Municipal Council on 22 March last. Among the types of waste that can be reused are clothes, shoes, toys, electrical appliances and others. The method of applying reuse techniques can reduce the amount of waste that ends up at disposal sites. Second, through the implementation of an e-waste purchasing programme, third, organic waste composting, and fourth, the Campaign Against the Use of Plastics.
The Honourable Member for Manir also raised the issue of poultry farms being fined, and for the information, indeed the PBT is the authority responsible for enforcing these Acts. However, recognising the need for licensing under the Poultry Farming Enactment, the State Government has approved the Guidelines for the Whitening of Existing Poultry Farming in the PBT throughout the State of Terengganu in 2024, involving a total of 180 existing farms, by granting permission for these farms to apply for planning permission, a limited period and a temporary building permit. Apart from that, the Government also agreed that the minimum fine rate be imposed on those farms that have been operated without approval.
Next, Honourable Deputy Speaker, my friend the ADUN for Bukit Tunggal mentioned several issues. The first issue, concerning river reserves, has already been answered by the Honourable EXCO for Infrastructure. Next, the second, which concerns the RPMM Banggol Pauh and also the RPMM Pulau Duyong. For the information, for RPMM Banggol Pauh, Kuala Nerus has experienced a delay with the actual physical progress at 25.17%, the schedule is 85.30%, and compared with the actual, 60.13%. The causes of the delay identified are, first, financial constraints, the delay in receiving monthly interim payments from June to December 2024, which caused the contractor to reduce the number of workers by half and reduce construction activities at the site, and second, a technical problem, namely the addition of windows in the kitchen area to provide sufficient lighting in the kitchen, but the contractor has still not obtained approval to carry out those works. Nevertheless, the contractor is doing its utmost to expedite the construction works so as to ensure the physical progress returns to the schedule. An extension of time (EOT) has been given to the contractor until 3 June 2025, and the latest completion date is 3 June 2025, and the handing over of keys will be done after the project's CCC is obtained, and it is expected to take between three to six months after the completion date. As for RPMM Pulau Duyung, the actual physical progress, going forward, is 8.97% compared with the schedule, and until now the project has not faced any delay problems, and the contractor is trying to complete the project according to the schedule that has been set. An extension of time (EOT) has been given to the contractor until 3 April 2026, and the latest completion date is 3 April 2026, insya-Allah.
Honourable Deputy Speaker, next, my friend, the ADUN for Bukit Besi, also touched on the need for affordable housing in his area. For the information of the Honourable Member, based on information already provided by the stakeholders at the district level, the State Government is studying several sites suitable for affordable housing projects in the Bukit Besi area. However, this process is still at an early stage, and a detailed study needs to be carried out first before its feasibility can be determined. Among the areas identified are, first, Kampung Dendang in Mukim Jerangau, behind Taman RMM Paya Lawas, with an area of five acres, and the area at the Bukit Besi lay-by in Mukim Jerangau, behind the old Bukit Besi R&R, with an area of 90 acres. Both proposed sites have hilly terrain, large trees and swampy areas, and some high ground and some low ground, which require a more detailed study.
Honourable Deputy Speaker, for the information of the Honourable Members, at this time the Affordable Housing Projects owned by the State Government or the Federal Government include complete packages such as, first, low prices. The affordable housing prices offered by the State Government are cheaper compared with market prices. For example, the price of RMM type A houses is sold at a subsidised price of RM80,000.00 compared with the actual cost of RM140,000.00.
Second, the concept of hire purchase for participants, where the State Government offers affordable housing packages on a hire-purchase basis to participants. Third, designs suited to the climate. Designs suited to the climate in the State of Terengganu. Apart from that, the affordable housing design used is based on the Shariah-compliant concept, namely using the Darul Iman or RAHMAN house design. Fourth, basic facilities, roads, water supply and electricity.
Honourable Deputy Speaker,
Can you be brief? If possible, seven minutes, okay?
Yes, I'll take one more minute.
The next and final one is from the ADUN for Langkap, who mentioned the housing project in the Langkap State Constituency. That is his proposal at FELDA Chalok Barat, which focuses on second-generation FELDA housing and the RMM Sungai Bari for the B40 group and young couples. For the information of FELDA Chalok Barat, the proposal to build 100 housing units under the Program Residensi Rakyat has been submitted to KPKT (Ministry of Housing and Local Government) for consideration of approval for implementation under the First Rolling Plan (RP1) of the Thirteenth Malaysia Plan (RMK Ke-13), but it is still under consideration by the Ministry. Meanwhile, at Sungai Bari there is a proposal to build 200 housing units under the PPK, or the area development programme, and the application has also been submitted to the Ministry of Rural and Regional Development (KKDW) for consideration of approval for implementation under the First Rolling Plan (RP1) of the Thirteenth Malaysia Plan (RMK Ke-13), and it remains under consideration by the relevant party. And lastly, Honourable Deputy Speaker, the ADUN for Telemung. He has mentioned this matter several times, but…
Is he aware of it? Is the ADUN Telemung aware of it?
Sedar.
Mention Telemung, and he's aware. Regarding the initiatives undertaken by the Government to overcome the shortage of houses in the Hulu Terengganu district. As I informed the House in the previous session, the land proposed by the Honourable Member was land that was indeed unsuitable for development projects, and therefore we have worked together with the Hulu Terengganu District Office to look for a suitable location, and, Alhamdulillah, the Hulu Terengganu District Office has identified a fairly suitable location, namely at Kuala Jeneris, Mukim Telemung, Hulu Terengganu. That is the proposal for an area development project on part of Lot 3400, Mukim Hulu Telemung, at Kampung Kuala Jeneris, involving an estimated cost of RM22 million, with an estimated 103 terrace housing units that can be built. Insya-Allah, God willing, it can become a reality.
Honourable Deputy Speaker…
Thank you.
Thank you on behalf of the people of Telemung.
Sama-sama
YB Dato’, may I ask a little.
Regarding the planning approval mentioned earlier, the PBT (local authorities) are closely related. The approval is roughly, the cost is roughly 25% more, over RM16 thousand, and it becomes a burden on the breeders, thank you.
Yes, thank you to the Honourable Member. As has already been stated, under the bulk regularisation programme organised by the Government, all those matters will be taken into account, including the issues mentioned by the Honourable Member just now.
So, Honourable Deputy Speaker, in conclusion, I humbly convey my gratitude and respects for the Royal Address delivered by His Royal Highness the Sultan at the Opening Ceremony of the Third Session of the Fifteenth Terengganu State Legislative Assembly on Monday, 14 April 2025, corresponding to 15 Syawal 1446 Hijrah. Wakaf Mempelam also respectfully requests to second the motion. Thank you.
Thank you, Wakaf Mempelam.
Honourable Menteri Besar, Honourable Members and observers all. As yesterday, I did not intend for us to take a break for a while and resume at 4.00, but I want to continue until we conclude before 5.00. So, if any Honourable Members and observers need or wish to step out for a while, they may do so, as refreshments are available outside and afternoon tea has been prepared, but I ask that you do not all leave together. Now, to continue the winding-up, I invite the Batu Buruk Representative. Please proceed.
Honourable Deputy Speaker, the Most Honourable Menteri Besar, colleagues, Members of the State Executive Council, Honourable Members of the State Legislative Assembly, Yang Berusaha heads of departments and agencies, officers and staff of the State Government, all guests, media personnel and observers, may the mercy of Allah Subhanahu Wa Ta'ala be upon you all.
Honourable Deputy Speaker and Honourable Members all, first of all, I humbly convey my respects and gratitude for the Royal Address of His Royal Highness the Sultan of Terengganu, Sultan Mizan Zainal Abidin. Indeed, the Royal Address is a beacon of guidance and a source of inspiration for the entire state administrative machinery in formulating policies and the direction of development grounded in Islamic values, social justice and the well-being of the people.
Honourable Deputy Speaker and Honourable Members, I extend my thanks to the Honourable Members who touched on the Portfolio of Information, Da'wah and Syariah Empowerment. The Honourable Bandar mentioned caning outside the prison. I would like to take this opportunity to thank all the agencies involved: the enforcement authorities under JHEAT, MAIDAM, the Syariah Prosecution Department, the wise judges in the Syariah Court Department, and not forgetting UPDI, DUAT, the Prison Department and PDRM, who gave their cooperation so earnestly that it was successfully implemented, and of course with the consent of His Royal Highness the Sultan, who granted consent for the gazetting of selected mosques for this punishment to be carried out. Insya-Allah, we will improve it from time to time.
As a result of what we have implemented, it has opened the eyes of the public, even though what was implemented did not meet 100% of the Syariah Ta'zir criminal punishment specifically. However, what is important is the political will of the State Government to continue to uphold the punishment or the Syariah criminal law. With the jurisdiction, the limits and the boundaries we have, we implement what we can first. What is important is that we want to show the public the difference between caning according to Islamic Syariah and caning according to civil law. When a judge makes a decision by selecting the offender for whom the caning punishment is decided, I receive calls from foreign media, and we understand their purpose is to give a bad picture and narrative of any effort to implement the Islamic Syariah Criminal Law. That it is backward, that it is primitive, that it is cruel,
that it is shameful to people, and so on. Alhamdulillah, we have taken careful and thorough steps. As a result of the steps taken, when it was implemented, those voices eventually disappeared, and indeed we received very good support from everyone. Having seen it implemented, the public could see how just caning under Islamic Syariah is, which aims to educate rather than to punish, compared with civil caning. Some came on the day of implementation, not only from Terengganu, but some also came from outside Terengganu, and I received WhatsApps and messages, with some asking when we would implement caning again. I said our purpose is not to cane people, our purpose is to educate the public. To show the public the difference between caning under Islamic Syariah and civil caning, which clearly lacks humanity.
I want to stress that the agenda of upholding the symbols of Islam, especially Syariah empowerment, is a priority of the State Government in all aspects, because that is the main purpose for which this government was formed, which is none other than:
"To uphold the religion and to administer the affairs of this world with it, that is, with religion".
However, we face challenges, especially the limitations in covering all the costs involving infrastructure and the welfare of the workforce within the scope of this Committee. But we always remain positive and proactive. The stance we take is: what cannot be done entirely should not be abandoned entirely.
Among the issues that became the main focus in this debate session is also concern about the implementation of programmes organised by the Government or the Local Authorities, which need to be more careful in observing the bounds of syarak. This matter has been raised with great responsibility by the Honourable Jertih, the Honourable Buluh Gading, the Honourable Ladang, the Honourable Batu Rakit, the Honourable Sura and the Honourable Air Putih. Some of the answers have been given by the Honourable Wakaf Mempelam just now. What is important is that we can see how the public takes every programme and activity organised by the State
Government seriously, especially those involving entertainment and cultural programmes, that they should be based on Islamic Syariah. This is one of the challenges for the State Government, because as we all know, entertainment is connected with this, it is part of human nature. However, what is important is that we want to educate the public that Islam does not prevent us from enjoying ourselves, but Islam has its boundaries. We do not want to be like Western society, which makes entertainment the goal of life, as the purpose, rather than a means.
Honourable Deputy Speaker and Honourable Members, regarding the concerns about the rising issue of drugs and vaping in the State of Terengganu raised by the Honourable Buluh Gading, the Honourable Sura and the Honourable Pengkalan Berangan, these were already answered earlier by the Honourable Wakaf Mempelam, EXCO PBT. However, drugs are placed under this portfolio. So the answer is more relevant to the vaping issue. Statistics for 2024 show that a total of 192, 857 persons were involved in drug abuse and addiction, including substances, throughout the country. Of that total, Terengganu recorded the second highest rate, at 974 persons per 100, 000 population. A figure that is very worrying for a state known as "Darul Iman", where we see some parties fishing in troubled waters, pointing fingers at states governed by the opposition, especially PAS, Perikatan Nasional, for the many drug-related cases in Kelantan, Terengganu, Kedah and the like. However..
Honourable, Honourable, may I interject for a moment.
Sila.
On this drug issue, indeed the drug offence rate is shown to be high, Honourable. But in my view, it reflects that the police are doing their work. If the police did not do their work, the drug index would fall. If the police do their work, the drug index must rise. I think the police are doing their work. Perhaps elsewhere, the police are not doing their work in other states. How about that?
Include it in my reply. I indeed agree with the Honourable Permaisuri on what was said just now. I congratulate PDRM and AADK, who played their role and worked so earnestly to ensure that drug abuse in our Terengganu State is tackled aggressively. Therefore, although the drug cases in Terengganu, with the very worrying figures and data mentioned just now, have in fact decreased from 2022, 13,314 persons, 2023, 12,058 persons, and 2024, 12,004. This means it is declining. However, we must realistically recognise that this drug issue is one that we must solve together. This drug issue is not the issue of certain states. This drug issue involves all levels of society without choosing anyone. This drug issue is no longer a district issue, a state issue, or a national issue, but even an international issue. I take as an example several countries in South America. Mexico, Venezuela, Ecuador and many others. These countries have had to deploy the army, not just the police, to solve the problems of drug dealers there, the drug cartels. So it is an international problem, which is why it is very distasteful when we hear the comments of certain parties pointing fingers at the data and statistics of high drug problems in states under Perikatan Nasional PAS, especially in the State of Terengganu. That is why I mention it and I agree with what the Honourable Permaisuri said earlier, and we must solve this issue together to ensure it can save our society. Therefore, the State Government has not remained silent in ensuring that the drug issue in this State of Terengganu does not continue to flare up and does not become the main social disease in this State. The establishment of the Darul Barakah village shows the State Government's seriousness in fighting this filth of drugs. For your information, the Darul Barakah Village, I am informed, is the first Drug Rehabilitation Village in Malaysia managed by a State Government. There is no State Government in Malaysia other than Terengganu. There are many private ones, but among those under the State Government, only Terengganu State bears all the costs. Alhamdulillah, since the last term we have succeeded in opening this village. To date, a total of 327 trainees have taken part in this programme, with 62 trainees still in the programme and 55 persons successfully fully rehabilitated. The treatment concept of the Darul Barakah Village is based on five main pillars, namely:
1. Purification of the soul
2. Development of the mind 3. Health care 4. Building a family environment 5. Life skills training
Next, Honourable Deputy Speaker and Honourable Members, I think some of the questions raised earlier have been answered, particularly by the Honourable Wakaf Mempelam, EXCO PBT, relating to vaping, and also relating to the drug issue raised earlier because the vaping problem is one that involves teenagers and youths. So we are worried that it will lead to worse things after that.
Next, the Honourable Members I mentioned earlier have expressed views, proposals and also constructive criticism so that the administration of the Terengganu State Government continues to run well, especially in this Portfolio of Information, Da'wah and Syariah Empowerment. I thank you very much for the proposals and views. In conclusion, I end my speech…
Yang Berhormat.
penggulungan ini…
Yang Berhormat.
Ya, sila.
Now that you're landing, I'll ask one question. Since the State Government is ready to uphold the Syariah of Islam, everyone knows that to uphold Islam, the first is prayer, starting with prayer. So I want to ask whether there is any law the government has prepared for those who deliberately abandon prayer, and if there is, how many
have we taken action against, if it has happened to people who deliberately abandon this prayer. Thank you.
Thank you, Honourable Batu Rakit, for your concern. I understand it is one of the questions raised by the Honourable Member that there was no time to answer. In brief, regarding Syariah empowerment and also raising the symbols of Islam in this State of Terengganu, especially concerning prayer, it is like planting a tree. When we plant a tree, if we want the tree to be fresh and alive, it must be given fertiliser and watered. At the same time, we must also protect it with a fence and guard against things that could damage the tree. So it is the same with prayer, which is a pillar of religion, as we have said. So, we the State Government hold many programmes under agencies, departments and bodies to constantly foster love among the people for the prayer worship. For example, we hold a "Prayer Month" in conjunction with the Isra' Mi'raj celebration. That is to nurture the worship of prayer. At the same time, we also have laws and regulations. Under the Syariah Criminal Enactment (2001), there is Section 18 that is specifically for persons who commit the offence of not performing prayer. However, so far, no one has been punished, because to prove that a person is guilty requires processes; there must be evidence, there must be witnesses and everything else. So proving that someone did not pray is not easy, because we know he may have prayed but fell asleep. He may have prayed but forgot, unless he makes a clear statement. He says, prayer is not obligatory. Ah, that's another matter. We must look at whether he is sane or not. So evidence and witnesses are needed. Nevertheless, we the State Government take more of an approach of educating our people to love and cherish acts of worship and obedience to Allah Subhanahu Wa Ta'ala.
Honourable Deputy Speaker and colleagues, Honourable Members,
Finally, with the utterance of respect and reverence, I humbly convey my gratitude to His Royal Highness the Sultan of Terengganu, Sultan Mizan Zainal Abidin. Batu Buruk respectfully requests to second.
Thank you to the Batu Buruk Representative. Next, I invite the Jabi Representative to deliver the winding-up. Please, YB.
Honourable Deputy Speaker. Jabi respectfully conveys his thanks and gratitude for the Royal Address of His Royal Highness Tuanku Sultan on the Opening Ceremony of the Third Session of the Fifteenth Terengganu State Legislative Assembly.
Deputy Speaker, before the world food crisis caused by the pandemic in 2020, Terengganu had launched the Terengganu Agricultural Strategic Plan 2019-2023 (PSPT) on 4 August 2019. It is an action plan for a five-year period that serves as the direction and KPIs for the state's agriculture sector. Had we moved forward a year earlier before the crisis occurred. If we look back to when we began shouldering the responsibility in 2018, the GDP performance of the agriculture sector (KDNK) was -2.5%. The agriculture sector was not only unable to contribute, but it became a burden to the state and had no clear direction or planning. Indeed, the saying "fail to plan is plan to fail" holds true, and we went through various trials and hardships throughout the COVID-19 pandemic period. We were also faced with the major floods of 2022. Finally, in 2023, which was the final year of the Terengganu Agricultural Strategic Plan 2019-2023, the state's agriculture sector GDP (KDNK) rose to 7.4% and was able to contribute 7.5% to the state's GDP. It is not a major achievement, but we have turned failure into a small success.
The wise have said, "continuing success is ordinary, but turning failure into success is extraordinary". Therefore, the target of a 12% contribution from the state's agriculture sector to GDP by 2030 under the PSPT 2024-2030 is realistic and grounded in reality. Among the constraints that prevent us from setting a higher target is that Terengganu does not have an Exit and Entry Point, with permission, for exporting agricultural products to international markets. In fact, the state's agricultural produce such as Terengganu sweet melons, watermelons, pineapples, marine produce, and aquaculture products such as hybrid grouper and sea bass do enter export markets. However, they are exported through international ports and airports in other states. Thus the GDP figures go to those states.
Deputy Speaker, I thank Bandar, Manir, Bukit Besi, Rantau Abang, Langkap, Kuala Besut, Permaisuri, Batu Rakit, Telemong, Kemasik and also Buluh Gading, who each touched a little on the agriculture sector in their respective speeches. Manir raised the issue of whitening of poultry farms and the cost of obtaining planning permission (KM), which is beyond the means of operators, and this was touched on briefly by my colleague, the EXCO for Local Authorities (PBT) earlier. In the process of whitening and licensing poultry farms, all poultry farms, whether existing or those yet to be built, must obtain KM from the local authority (PBT). A major unresolved issue, which we are well aware of, is that we receive many complaints relating to development charges, compound payments for building without approval, and temporary permit fees that are excessively high, reaching hundreds of thousands of ringgit. If this issue is not resolved promptly, the failure to obtain KM will cause poultry farms involved to be forced to close, and Terengganu State will lose more than 50% of existing farms. This will be a severe blow to the state's self-sufficiency ratio (SSR) for broiler chicken supply, which will fall from the current 71% to only 30%. We take full responsibility for resolving this issue in the most harmonious manner, a win-win situation within the scope of existing regulations between agriculture and the PBT. Engagement sessions between all parties involved and stakeholders will be held promptly, insya-Allah, and we face a dilemma between the interest of generating direct revenue for the PBT and the issue of the economic growth of the people, and all of this we must examine carefully and prudently.
Deputy Speaker, Kemasik, as host to the Ma'Daerah Turtle Sanctuary, touched on turtle conservation efforts. Turtles are actually a species of animal from the dinosaur era that have survived until today. The record of turtle hatchling releases in Terengganu from 2018 to 2024 is 3,025,735 turtles. We have released many. Statistically, for every 1,000 turtle hatchlings released, one will succeed in surviving to adulthood and returning safely to the beach where it hatched and was released. A ratio of 1:1000. Although
turtles have the ability to swim across oceans and travel between continents, turtle survival is exposed to many threats. From 2015 to 2025, over a period of 10 years, a total of 592 turtle deaths were recorded. In 2024 alone, 52 turtle deaths were reported, the same number as in 2023. Up to March 2025, 22 turtle deaths have been reported, and there is no specific evidence for us to state the exact cause of death. However, usually the dead turtles are found either trapped in fishing nets, with ropes wrapped around their bodies, as carcasses, as carcasses washed up on the beach, or with stones tied to the carcasses for the purpose of sinking the dead turtles to the seabed. Therefore we can conclude, based on the circumstances in which all of these were discovered, that they were caused by human hands, and the State Government through the Department of Fisheries has conducted several enforcement operations. Among them is the enforcement operation against trawl nets at landing jetties and at sea, especially in Kemaman and Dungun, which have recorded high numbers of trawl nets. The second is operations against fishermen who encroach on the turtle sanctuary zone, and the third is enforcement under the Terengganu Turtle Conservation Enactment 1951 amendment 2021, which provides for heavier penalties for offences involving turtle deaths.
For the information of Buluh Gading, Rantau Abang and Kemasik regarding TKPM, in addition to the five that already exist, we will develop six more TKPM going forward under the Terengganu Agricultural Strategic Plan 2024-2030. Among them are in Kuala Nerus, TKPM Bukit Rong Ubi in Rantau Abang, we already have TKPM Rantau Abang, and in Kemasik there is TKPM Kemasik. This means Kuala Nerus has two TKPM (TKPM Mengabang Bakong) and the one to be developed is TKPM Gong Ubi. Dungun will have two TKPM, in Rantau Abang and also in Pinang Merah. Kemaman will also have two TKPM, in Paloh Jenang and also in Kemasik, completing the provision of permanent food production parks in every district.
Deputy Speaker, Buluh Gading raised the issue of abandoned land. Abandoned land, in terms of the definition used by the Department of Agriculture, is privately owned land, whether owned by individuals or companies, with an area exceeding one acre, left undeveloped for three consecutive years. In 2020 the State Government set up the Abandoned Land Development Task Force, and we in fact already have an abandoned land data bank in Terengganu State, which we recorded in 2021 as 8,263 hectares. That is quite large. A total of 1,122 hectares were developed from 2008 to 2021. With various crops, located in all districts, and for the record, Terengganu is the second best state after Pahang in terms of success in developing abandoned land. Starting from 2021, the State Government provides incentives for the provision of infrastructure on abandoned land such as irrigation systems, fencing, and roads, amounting to 20,000 for each hectare. In 2021 we provided 500 thousand, in 2022 it rose to one million, in 2023 it dropped slightly to 500 thousand, and it is a loss when land of such value is left abandoned for a long period, and when we ask many landowners why the land is not being cultivated, the classic answer we receive is "keep it for inheritance". Inheritance does not need to be kept. When we die, the estate we leave behind, including land, will become inheritance. What we want is for us, while we are still alive, to work as khalifah of Allah on earth, and we must strive to cultivate the earth of Allah.
Deputy Speaker, Langkap raised the issue of State Government Land developed by FELCRA. The total State Government Land developed by FELCRA is 9,651 hectares. There are three categories. The first, developed for the Poorest Households Eradication Programme (PPRT), is 4,227 hectares. In fact, for the land developed for the PPRT programme, the State Government Council Meeting (MMKN) on 6 May 2015 agreed that the land being cultivated be given ownership to the Warisan Trust Fund Board, and insya-Allah we will contact the Board to take action on the MMKN decision made 10 years ago. This means the decision already exists, only the action to transfer ownership has not yet been taken. The second, the joint venture (JV) programme, covers 4,440 hectares, and the MMKN in 2015 also approved it for FELCRA, with 90% of the more than 4,000 hectares to be transferred to the Warisan Trust Fund Board and 10% to FELCRA, and there is a profit-sharing agreement signed on a net profit basis of 70/30. 70 parts to the State, 30 to FELCRA. The third category is where FELCRA develops the land and then it is filled with participants.
Honourable Deputy Speaker, the Member for Kuala Besut proposed the opening of nyor (gnetum) plantations. Currently, the SSR for coconuts in our state was around 53% in 2019, and in 2023 we have actually raised it to 74%. However, the phenomenon of shortage of coconut milk supply being faced throughout the country, as a result of the climate change situation, weather changes from around June until September last year, has caused nyor trees to stop producing male flower spathes,
and when there are no male flower spathes, that means there are no fruits. Another factor is competition from the young coconut industry. A young coconut costs RM4.50, but when it is left to mature, it becomes RM2.50, so the longer you wait, the cheaper it becomes. That is precisely why young coconuts are more favoured by growers for sale, because they generate higher income.
Honourable Deputy Speaker, various agricultural issues were raised by the Member for Telemong. In fact, the State Government has never marginalised Hulu Terengganu in the state's agriculture agenda. The allocations we channel to Hulu Terengganu have consistently increased from year to year. I inform you roughly: in 2018, RM433,000.00 for the various sectors of agriculture, livestock, and fisheries, including allocations for irrigation and drainage, and the biggest beneficiary is the aquaculture sector. 2018 RM433,000.00, 2019 rose by more than RM530,000.00, 2020 rose by more than RM1 million, 2021 RM2,146,000.00, 2022 more than RM1,300,000.00, 2023 more than RM2,188,000.00, and the highest was in 2024 at more than RM5,400,000.00. So, if we add all of these up, including aquaculture assistance allocations from 2018 to 2024, we have channelled more than RM16 million to the Hulu Terengganu district. I do not rule out the possibility that the Hulu Terengganu district will be gazetted as the second Terengganu Food Production Hub after the Setiu district. So, the Hulu district can prepare to work hard so that together we collaborate in developing the state's food security sector. Deputy Speaker, that is all, the Member for Jabi also supports.
Honourable Deputy Speaker, may I have the floor.
Sila.
Can I? Thank you. Like this, I am not going to dispute what was said by the Member for Jabi earlier, thank you very much for the efforts of the Honourable Member for Jabi and also the Department of Agriculture. But the problem is, if the Honourable Member comes and takes a look, it is declining. The Honourable Member said earlier there was a big increase in the budget, but now I do not see it here in Hulu Terengganu. If we take rice as an example, like the Honourable Member for Kuala Berang mentioned rice, there is none, and the irrigation is also not working properly. Popular areas before, the Sekayu Agricultural Park, we had to arrange with the District Officer for a communal work lot, one Council, one District Office, so, that is the thing, because if we want to bring the Minister, I have checked, I feel there is not one place that we feel is suitable, there is only oil palm, oil palm is vast, but it is not a place where we can bring the Minister, oil palm, elsewhere there is more space, more attractive. So that is how I am, we ask the Government, the Department of Agriculture to give attention, focus especially on the Sekayu Agricultural Park, before, people came, and after the crowds came, the people got returns, when they came they bought, they sold. That is it, we are not trying to make it too big, I understand the problems today, but if possible give focus to several areas mentioned yesterday, many today, because the areas have nothing that can attract people, sorry, a lot. Thank you.
Alright, I take note of everything informed by my friend, the Honourable Member for Telemong, including the interjections from the Honourable Member for Kuala Berang yesterday. However, if I may inform a little, the issue of the abandoned paddy fields in Kuala Berang is not because of a lack of infrastructure, the infrastructure is there, but there is no younger generation who wishes to continue cultivating the fields. So after the older folk, there are no children who look at the fields as a place to earn a living. Even if we open them to investors, the area is small and scattered, not suitable to be made into one commercial sector. So, that is among the situations. Anyway, as I mentioned earlier, we will continue with detailed planning and cooperation from the district to realise the district's aspiration to become the second agricultural hub after Setiu, insya-Allah, with more detailed planning. Thank you, my friend the Honourable Member for Telemong, thank you Honourable Deputy Speaker, the Member for Jabi also respectfully requests to support the Motion of Thanks for the Royal Address of His Royal Highness Tuanku Sultan.
Thank you, Member for Jabi. Alhamdulillah, Honourable Dato' Seri Menteri Besar, Members of the State Executive Council, Honourable Members, Heads of Departments, distinguished observers, yesterday afternoon we took a break during the afternoon session, this afternoon we continue, and there are only two more State Government Representatives who have yet to deliver their winding-up. So, since we did not take a break earlier, I think we should adjourn our Sitting for today and resume tomorrow, Thursday, 17 April 2025, at 9.30 a.m., and let us together adjourn our meeting by reciting the tasbih kaffarah and Surah Al-'Asr.
MEETING ADJOURNED AT 4.13 P.M.