Johor · 3 December 2020

14th Assembly, 3rd session, 3rd meeting · 227 turns · 36,442 words · official PDF ↗

214 of 227 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.

Announcement from the Honourable Mr Speaker.

SpeakerEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. (Recitation of selawat). Alhamdulillah, we have now reached the sixth day of the Third Meeting of the 2021 Budget of the Third Session of the Fourteenth Johor State Legislative Assembly (Dewan Negeri Johor).

Oral Questions.Questions

SpeakerEN

Honourable Mengkibol, please.

Tuan Chew Chong SinDAP · PHMengkibolEN

Thank you, Mr Speaker, question number 1.

What plans are there to establish laboratories and facilities for COVID-19 testing at the CIQ?

SpeakerEN

Honourable EXCO Member, please.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Thank you, Mr Speaker. In the context of the question raised by the Honourable Member for Mengkibol, the state government, through the Office of the Yang Amat Berhormat Menteri Besar, appointed a private company in August 2020 to coordinate COVID-19 screening and testing services at the international entry points for 2 specific programmes, namely the Reciprocal Green Lane (RGL) and the Periodic Commuting Agreement (PCA), at Bangunan Sultan Iskandar and the Sultan Abu Bakar Complex.

The company is responsible for coordinating several private laboratories recognised by the Ministry of Health Malaysia to carry out tests on samples taken at the international entry points.

Establishing a laboratory at the CIQ facility is not appropriate, as a laboratory requires the best quality management standards to guarantee the accuracy of sample results. Thank you.

SpeakerEN

Yes, Honourable Mengkibol, supplementary question.

Tuan Chew Chong SinDAP · PHMengkibolEN

Thank you, Mr Speaker, and EXCO for Health. For the answer just now, the screening facilities that will be added. My question is more about the laboratory. The EXCO has already answered about the laboratory, that the situation may not be suitable. But if we look at the need, it is indeed very necessary, like at Changi Airport, where the Singapore government has also set up a laboratory. So I ask that the government consider this, because obtaining results within such a short time is a very critical factor for reopening the border.

So my question is, quarantine conditions are determined by each country itself. For example, the UK allows visitors from Singapore to enter the UK without quarantine. So my question,

scientifically, can we also exempt the quarantine period for visitors from Singapore? Thank you.

SpeakerEN

Honourable EXCO, please.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Honourable Speaker, the question raised was about laboratories, but it has already reached the issue of quarantine. In fact, whatever decision is taken to quarantine someone at our national level, the decision is made through the proposal given by the Ministry of Health Malaysia and decided by the National Security Council.

In the context of the laboratories we have in Johor state, the purpose, after screening and also laboratories, is that we ensure the company that has been selected can provide results at a rapid rate. And for the purpose of services here, this company involves 10 private laboratories with a capacity of 30 tests a day. And in Johor state there is also 1 private laboratory responsible for conducting COVID tests specifically for the RGL and PCA schemes, with a capacity of 1,000 people a day. So, the company is also in the process of adding 2 more laboratories in Johor, with a total test capacity of 7,000 people a day.

So, if we look at their entry under the RGL and PCA programmes, it has not even reached the quota that has been set. So for now, there is no need for additional laboratories or new screening centres. Thank you.

Speaker

Ya Stulang.

Tuan Chen Kah EngDAP · PHStulangEN

Thank you, Mr Speaker. Regarding this screening test laboratory, as we are well aware, current screening tests for PUS and close contacts, these 2 categories, are conducted at the same place. And now in Johor there is an increase in cases, so the number of close contacts and clusters will also increase, and the number of those returning from Singapore is also large.

So my question is, in terms of risk and waiting time, is the government prepared to provide a suitable place, a screening site for close contacts to undergo screening tests? That means close contacts and PUS are separated. Thank you.

SpeakerEN

Honourable EXCO, please.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Honourable Mr Speaker. Thank you for the supplementary question. In fact, we are well aware, and it is indeed worrying, that in Johor state many clusters are emerging every day. And if we look at the action taken through the Johor State Health Department, for now the number of people screened is because they are aggressively trying to find close contacts, and surveillance is also being carried out aggressively at the grassroots level so that these cases do not spread. And the large number of tests taken, even in one place, is to ensure there is no transmission.

And, all screening was done even in the context of close contacts and PUS at the same place, but the standard applied is the standard to ensure there is no transmission, nothing, the samples given and the results given are accurate results. And, perhaps some may wonder, there are also viral pictures

for example, why are so many people lining up in rows, having to take swab tests? Is the entire village already infected with COVID-19? Not so, but the effort taken is to cut off the transmission. We don't want to take any risk. That is why sometimes we have to conduct screening on such a large scale, so that we don't take things for granted, and in that effort, this is the effort taken to ensure no one is missed, no one is missed, and we want to make sure every person in the area is not infected, not positive. And as said earlier, a very aggressive effort is being taken.

In the context of the Johor State Health Department, that is why the number screened in each cluster is so large, some up to 1,000 people, 2,000 people, 500 people, 600 people and so on. Because the purpose of screening is not because they are involved, sometimes they might not be close contacts either, but we don't take things for granted, and we make sure that we swab as many people as possible so that this does not spread. That is the only reason. One other thing, the number screened is very large. Thank you.

SpeakerEN

The next question, Honourable Stulang, please.

Tuan Chen Kah EngDAP · PHStulangEN

Honourable Mr Speaker, my question number 2.

What constraints have caused the VEP and RFID projects at the Malaysia/Singapore border still not to have reached the planned figures and smoothness of operation?

SpeakerEN

Honourable EXCO, please.

Tuan Haji Mohd Solihan bin BadriBERSATU · PHChairman of the Committee on Public Works, Transport and Infrastructure · TenangEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi taala wabarakatuh. Honourable Mr Speaker, the VEP (Vehicle Entry Permit) system is a permit in document form that allows foreign vehicles to enter and remain in Malaysia. The Ministry of Transport (MOT) has announced that the VEP system will be introduced for foreign vehicles entering Malaysia, and it has indeed been introduced.

Meanwhile, RFID, which stands for Radio Frequency Identification, is a technology that can identify an object using microwaves, and which also functions when vehicles pass through tolls: an overhead scanner that reads radio frequency from TNG, an RFID tag and a toll surcharge. The tag will be registered with Touch n Go, the user's e-wallet, and the toll fare will be deducted from the TNG balance in that e-wallet.

The status of the VEP project was officially handed over by the vendor to the Ministry of Transport on 22 March 2019. The Road Transport Department (JPJ) is highly committed to preparations to implement VEP enforcement operations. And for information, the road charge operation has been running since November 2016 and is still running as usual without any problems. To date, the collection of revenue from this road charge, which began in November 2016 until now, amounts to Ringgit Malaysia, this is a big figure, Honourable Mr Speaker, RM358,060,720.00.

The breakdown is as follows: from 2016 to 2020, the number of vehicles 17,722, sorry, 17,722,813, and the value is as I mentioned earlier, RM358,060,720.00.

For the information of this esteemed House, the latest is that JPJ and MOT are still and are endeavouring to improve the registration process for foreign vehicles from time to time, to ensure VEP enforcement can be implemented in due course.

For information, JPJ has also carried out the distribution of RFID tags as a complement to the registration process for foreign vehicles through 4 distribution counters, namely at the Hentian dan Rawat (R&R) Pandan, Gelang Patah, Lima Kedai and the Angsana parking area. This ran from January 2019 until 18 March 2020, the date the Perintah Kawalan Pergerakan (Movement Control Order) began due to the COVID-19 pandemic.

During the distribution period, a total of 65,471 RFID tags were installed and validly registered to foreign vehicles. However, from January 2020, the number of Singaporean or foreign vehicles coming for registration and collection of RFID tags dropped sharply, and this was affected by the border being fully closed, and no more registrations were made from 18 March 2020. Thank you.

SpeakerEN

Yes, Honourable Stulang, please.

Tuan Chen Kah EngDAP · PHStulangEN

Thank you for the answer given by YB EXCO. We, as we all already know, the RFID and VEP projects were decided and implemented before 2018 during the BN government, and the problems of installing RFID tags, the difficulty of installation, we already knew about these problems even before COVID. So my question is, since the installation of RFID tags has not reached a satisfactory figure, how much is the additional cost, the additional cost that must be borne by the government, perhaps how much is the additional cost due to us not reaching the planned figures and smoothness of operation? Thank you.

SpeakerEN

Honourable EXCO, please.

Tuan Haji Mohd Solihan bin BadriBERSATU · PHChairman of the Committee on Public Works, Transport and Infrastructure · TenangEN

Honourable Speaker, this matter is carried out by the federal government through the MOT. JPJ only implements. I do not have information on that so far. I will obtain it from the relevant party and reply to the Honourable Member for Stulang in writing.

SpeakerEN

The next question, Honourable Sri Medan, please.

Honourable Mr Speaker, my question number 3. Does the Johor state government have data on the number of illegal factories in Johor state, and what are the state government's plans for tackling the issue of illegal factories?

SpeakerEN

Honourable Bukit Batu, please.

Tuan Jimmy Puah Wee TsePKR · PHBukit BatuEN

Honourable Mr Speaker, my question number 4.

What action has been taken by the Kulai Municipal Council (Majlis Perbandaran Kulai, MPKu) against the illegal factory that is the source of water pollution (water smelling of pandan) recently?

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Assalamualaikum warahmatullahi taala wabarakatuh. Salam sejahtera, salam makmur Johor. Honourable Mr Speaker, thank you to YB Sri Medan and also Bukit Batu for the questions related to illegal factories and also the government's plans to tackle these illegal factories. For the information of this esteemed House, Honourable Mr Speaker, for Johor state there are a total of 2,491 illegal factories, or 24.5% of factories that are unlicensed, vacant and still in the process of their application. Let me read the data for factories more than the number 100, yes, divided by 16 local authority areas (PBT). In Johor, the factories are very numerous, from the 2,491 illegal factories. In the Iskandar Puteri City Council there are 1,694 illegal factories, representing 60.3% of the total illegal factories in all of Johor. Johor Bahru, the Johor Bahru City Council has 190 illegal factories, and in the Kulai Municipal Council there are

There are others, Honourable, I think there is no need for me to read out everything, so what I want to mention is, what plans have been made by the government? I will give the example of the Iskandar Puteri City Council. Among the taskforce's work steps that have been carried out is identifying industries that have licences and those without licences. Premises that comply with or breach licence conditions, and those that do not comply with the approved plan, producing chemicals or waste discharge, and premises that disturb or factories that disturb nearby residents. That is what has been done by the City Council because Iskandar Puteri has the most factories. And another example of plans made by the Batu Pahat Municipal Council (MPBP), which I see has positive actions that have received a good response from factory operators, is the whitening programme carried out by MPBP since 2019, which saw a reduction from 890 factories to a level of 300 in 2020. So, MPBP intends to carry out this whitening programme until 31 March and provide guidelines on minimum technical requirements to help developers plan licence applications. Besides that, the government plans to give a period to factory operators operating without a licence to obtain a valid business licence. After this period, factories with no data in the government will be ordered to close or undergo demolition.

In the National Council meeting on local government, Honourable Mr Speaker, all state governments asked the legal division at the Ministry of Housing and Local Government to review the fine currently imposed, which is RM5,000.00. It was proposed to increase it to RM100,000.00, but we do not agree, especially for factories that are the source of water pollution, which can disturb residents, yes. This one we do not want. Even if the fine rises to RM1.0 million, we also do not agree; if possible, the licence of such a factory should be closed or the factory demolished. And thankfully, our proposal for all state governments was agreed, for the Local Government Legal Division to review it and bring it back to the National Council meeting.

Honourable Member, that is the plan that has been made, and perhaps we can also consider those who provide information about the operations of these illegal factories that cause disturbance, affecting, perhaps by giving some award, which could also help us. Many will make complaints. But I want to emphasise in this esteemed House that, so far during the COVID pandemic, we will not take action, except for factories that affect the water supply source or that extremely disturb the health of residents. Those we will take action on.

To answer the question from Bukit Batu, relating to the water pollution that smells of pandan: this is an illegal factory, smelling of pandan. This factory was identified as a recycling factory operating illegally. The pandan-smelling water is caused by the substance tetrahydrofuran. Is that the correct pronunciation, Honourable Chairman? Eh, Mr Speaker...

SpeakerEN

The problem is I can't see that spelling.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Can't see. Who has a doctor...

Tuan Tan Hong PinDAP · PHSkudai

Tetrahydrofuran (THF).

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Ha, correct. Thank you, Skudai. But it does sound like it, yes. (House laughs).

SpeakerEN

You can use Google voice, yes.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Ok, ok. The substance used to dissolve plastic materials, THF, can cause coughing and breathing difficulty. Honourable Mr Speaker, for the case raised, I will read briefly, Honourable: the Water Regulatory Body (BAKAJ) inspected and found an abnormal smell in the treated water at the treatment plant on 19 July, and the Municipal Council took action against this factory, which caused water pollution in the administrative area of MPKU. This factory is on Lot 792, Jalan Kulai – Kota. The Enforcement Division issued a notice to the owner under Section 108 for the collection of recyclable materials without permission, 1 compound was issued, and an integrated operation by MPKU's Technical Division was carried out on 9 September involving the Licensing Division, the Development Division, the Planning Division, the Legal Unit, the Solid Waste Management Corporation (SWCorp) and the Water Regulatory Body (BAKAJ). Investigation findings: the Licensing Division found that the factory premises did not have a licence and had been carrying out business activities as a recycling centre. So the Development Division issued a notice under Sections 71 and 72 of the Akta Jalan Parit dan Bangunan, and that the building be demolished within 14 days, and a notice was also issued under the Akta Perancang Bandar dan Desa 1976, for carrying out development without permission. The Solid Waste Management Corporation also carried out collection, intelligence gathering and periodic monitoring. On 10 November the factory was not operating, and on 11 November sounds of iron-cutting work were heard inside the factory.

I would like to propose, I have discussed with MPKu, that if we want to take action, it can be done under Act 133, under Act 172, and the Land Office, through enforcement action that can be carried out from time to time on land that breaches certain conditions under the national land provisions. PTG Johor also has a land enforcement unit, and whoever breaches the conditions can have action taken through the District Land Administrator. Under the legal provisions, the Land Administrator can first send a notice to the landowner who breaches the conditions, and the owner has the right to remedy the land. That means restoring the original condition: if it was previously agricultural land, we know agricultural land must be restored to its original condition. If they breach it again, action can be taken, including demolition. Because this is the source of water pollution, affecting the water treatment plant and causing harm to consumers, especially in the Kulai areas, Honourable Mr Speaker.

SpeakerEN

Skudai, Bukit Batu, please press the mic.

Tuan Jimmy Puah Wee TsePKR · PHBukit BatuEN

Ok, terima kasih Mr Speaker, terima kasih kepada the Honourable EXCO dari Rengit. Sukacita saya nak katakan di sini, saya cukup gembira ya, tertarik dengan apa yang dikatakan oleh YB EXCO, hasrat political will yang ada pada kerajaan ya, untuk membanteras isu kilang haram terutamanya terhadap kilang haram yang menjadi punca pencemaran sumber air kita di Johor. Itu juga satu pendirian yang diambil oleh kerajaan Pakatan Harapan dan diteruskan oleh kerajaan sekarang. Dan saya suka bila mendengar RM1.0 juta kompaun pun kita tak akan lepaskan mereka.

Yang Berhormat Mr Speaker, untuk soalan saya itu, saya harap ya Honourable Member for Rengit tolonglah kita guna layman, jangan bagi dia chance lah. Jangan bagi chance kepada syarikat, kepada kilang haram ini, sebab ini adalah satu kita kata contoh. Kalau orang tahu boleh cemar air dan sampai hari ini berapa bulan dah masih beroperasi, bayangkanlah di Sg. Sayong ya, di Simpang Renggam, mana-mana orang berani. Sekarang ada 2,500 kilang haram dan kebanyakan kilang haram tu bila dia haram sebab dia buat benda yang haramlah, kalau tidak boleh dia mohon lesen sahaja. Biasa haram sebab dia cemar air, cemar udara dan pelbagai-bagai. So, saya harap kerajaan ada political will, tak kiralah kerajaan mana pun, untuk kita sama-sama menangani isu ini dan saya harap kalau boleh kerajaan sekarang ni, YB EXCO pergilah, jangan kasi dia chance, tutup sahaja kilang haram ini.

SpeakerEN

Tak ada soalan Yang Berhormat? Yang Berhormat. Jementah, jemput, Skudai ya, Skudai dulu. Sorry, sorry. Bukan soalan Yang Berhormat.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Dia nak tahu ketegasan kerajaan negeri dalam nak membendung isu yang melibatkan pencemaran air.

SpeakerEN

Tak, penyoal kata tak ada soalan.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Terpulang kepada Mr Speaker.

Speaker

Sila, sila.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Kalau diizinkan, saya jawab.

Tuan Jimmy Puah Wee TsePKR · PHBukit BatuEN

Itu soalan saya tersiratlah. (Dewan ketawa).

SpeakerEN

Ok, jemput, jemput.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Yang Berhormat Mr Speaker, terima kasih, saya ambil masa ringkas. Saya bersetuju dengan pandangan Bukit Batu. Dah sampai masanya kita kena tegas, dan saya dah berbincang dengan Yang Di Pertua Majlis Perbandaran Kulai, saya dah merujuk kepada perkara-perkara ini kepada the Honourable Legal Adviser, saya juga akan bincang dengan PTG kita. Tak boleh bagi peluang lagi kepada mereka-mereka yang sengaja dengan jelas mencemarkan punca air. Insya-Allahlah, selepas ini kalau ada ruang masa waktu kita ini, kita akan, bukan ada ruang perlu, untuk kita terus ambil tindakan, dan saya akan panggil mesyuarat dan kita akan jemput sekali Bukit Batu bersama kita dalam membendung isu ini. Yang Berhormat Mr Speaker. Terima kasih.

SpeakerEN

Beri Sri Medan dululah, Sri Medan sebab dia punya soalan tadi.

Terima kasih Yang Berhormat Speaker, terima kasih juga kepada the Honourable EXCO yang telah memberikan jawapan pada persoalan saya tadi dan saya amat bersetuju dengan apa juga jawapan dan juga tindakan yang telah diambil oleh pihak kerajaan. Sebentar tadi Yang Berhormat EXCO ada terangkan tentang soal pemutihan ya, ada 2,491 kilang haram yang tak berlesen sahaja, 24.5%. Jadi saya melihat di sini ya, selain daripada soal ekonomi yang agak merudum pada hari ini, tindakan daripada pihak kerajaan mungkin boleh memberi kesan pada dari segi ekonomi. Oleh itu saya melihat dengan kilang-kilang haram yang ada dalam negeri Johor ya, kebanyakan mereka beroperasi atas sebab mereka mendapat bekalan daripada Tenaga Nasional Berhad (TNB) ataupun Syarikat Air Johor (SAJ). Adakah pihak kerajaan ya, boleh melakukan penyelarasan antara kerajaan dan agensi-agensi yang berkaitan kerana bila ada supply daripada TNB dan

juga SAJ, jadi mereka boleh beroperasi. Dan kalau saya lihat di sini dengan apa yang berlaku, soal kilang-kilang haram ini, saya bersetuju dengan apa yang dikatakan rakan saya Yang Berhormat Bukit Batu. 90% saya rasa pencemaran yang berlaku di sungai dan di mana-mana tempat adalah berpunca daripada kilang-kilang haram. Mereka hit and run, dengan izin. Jadi mereka melakukan pencemaran dan mereka bila-bila boleh lepas tangan. Jadi, apa tindakan kerajaan untuk kita menangani perkara ini dengan melakukan penyelarasan dengan agensi-agensi kerajaan yang lain?

Kerana contoh, minta maaf Yang Berhormat Speaker. Yang pertama, di tempat saya, di kawasan Sri Medan ada juga kilang yang beroperasi, iaitu kilang menternak katak. Mungkin agak pelik, makanan binatang yang dulunya bukan bahan makanan sekarang dah jadi makanan. Jadi hari ini, kilang katak itu selain daripada dia menternak katak, mereka menjadikan memproses katak tersebut untuk dieksport. Dan tempat yang digunakan untuk menternak katak adalah tempat-tempat yang bukan tempat kawasan industri pun. Jadi, bagaimana kerajaan nak menangani perkara ini? Dan saya rasa dalam keadaan sekarang, hari ini, ekonomi pun saya sebut tadi merudum. Jadi, perlukah kerajaan bertindak tegas dan juga bagaimana nak menangani soal pekerjaan dan juga sebagainyalah? Kalau boleh kerajaan secara berhemah dan juga mendapat kerjasama daripada semua pihak agensi kerajaan yang lain. Terima kasih.

SpeakerEN

Susah nak jawab ni, sekejap dia suruh tutup, sekejap tidak. Jemput Yang Berhormat.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Yang Berhormat Mr Speaker, saya nak tanya ini, katak jenis apa ya? (Dewan ketawa).

Nak kena jawab ke Speaker?

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Dia tak sebut jelas katak apa ke.

SpeakerEN

Tak apa, buat aje.

Saya ingat Yang Berhormat Speaker, katak yang saya maksudkan katak jenis binatanglah. (Dewan ketawa).

SpeakerEN

Katak yang binatang.

Tuan Jimmy Puah WeeTsePKR · PHBukit BatuEN

Bukan katak politik ya. (Dewan ketawa).

SpeakerEN

Ok. Teruskan Yang Berhormat, ini tak ada kaitan dengan itu semua.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Ok, ok, ok. Yang Berhormat Mr Speaker, kita kena berlaku adil.

SpeakerEN

Rengit ni suka aja benda tu, biar dia panjang dan ambil 10 minit.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Kilang ini, kita kena berlaku adil.

Pertama, ada kilang ini yang kita istilahkan kilang haram wujud lama. Dia dah lama wujud di kawasan local authority (PBT), cuma dia tak menjalankan proses pemajuan. Dan dalam program pemutihan yang dijalankan oleh beberapa PBT, kita syaratkan mereka ada buat zon ya, apa buffer zone, dan seperti yang ditegaskan oleh rakan saya tadi dari Sri

Medan, dalam keadaan pandemik sekarang ini, ramai kalau kita ambil tindakan, mereka akan diberhentikan kerja. Ini akan menjejaskan juga masa depan ramai pekerja.

Jadi, kita bawa sekali Yang Berhormat Sri Medan dalam usaha program pemutihan. Kita bawa sekali agensi terutama sekali agensi alam sekitar yang boleh kita lihat beroperasi mengikut piawaian yang ditetapkan oleh alam sekitar, kita bagi pemutihan. Tetapi kalau kita lihat kilang ini boleh menjejaskan alam sekitar, kita tak akan benarkan mereka beroperasi, kita bagi tempoh mereka untuk berpindah ke lokasi yang ditetapkan, kawasan-kawasan taman industri yang telah diwartakan. Tapi kalau masih degil lagi kerana mengganggu dan menjejaskan alam sekitar, kita akan ambil tindakan, sama ada membuat perobohanlah.

Tapi bagi masalah keadaan-keadaan sekarang, memang tak begitu sesuai untuk kita ambil tindakan. Izinkan pihak kerajaan negeri, selepas ini baru kita boleh ambil tindakan, pandemik selesai. Yang Berhormat, katak tadi saya akan melawat sendirilah dengan Yang Berhormat Sri Medan, apa jenis katak.

SpeakerEN

Ok juga Yang Berhormat. Panjang lagi Yang Berhormat.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Kalau mengganggu sangat keadaan, mungkin kita boleh ambil tindakan. Yang Berhormat Mr Speaker, terima kasih.

SpeakerEN

Skudai, soalan terakhir.

Tuan Tan Hong PinDAP · PHSkudaiEN

Terima kasih Mr Speaker. Mr Speaker, soalan saya ada kaitan juga dengan soalan Sri Medan, tapi bukan berkenaan katak dan susulan pada jawapan Yang Berhormat EXCO tadi. Jadi saya harap Mr Speaker boleh izinkan saya terangkan sedikit, mungkin ambil masa sikit tentang latar belakang...

SpeakerEN

Soalan Yang Berhormat, tak boleh Yang Berhormat.

Tuan Tan Hong PinDAP · PHSkudaiEN

Dia bagi latar belakang sikit supaya nanti jawapan dia lebih jitu.

SpeakerEN

Tapi latar belakang Yang Berhormat ini 10 minit.

Tuan Tan Hong PinDAP · PHSkudaiEN

Tak kan 20 minit. Ambil masa sikit aje.

SpeakerEN

Soalan, soalan tambahan Yang Berhormat.

Tuan Tan Hong PinDAP · PHSkudaiEN

Ok. Yang Berhormat Mr Speaker, ini kadang kita tengok kilang haram itu seperti yang disebut oleh Yang Berhormat EXCO tadi. Kadang dia ada latar belakang, dia ada sejarah dia, dan secara amnya kita boleh lihat dia ada 2 jenis, 2 kategori yang secara umum, di mana di antaranya adalah haram secara teknikal, iaitu dari segi ubah syarat guna tanah tak betul, dari segi zoning dia tak betul dan sebagainya.

Yang kedua ialah isu pencemaranlah. Yang isu pencemaran itu kita tak boleh kompromi. Kita mesti sama ada tutup terus ataupun pindah dan denda dan sebagainya. Bagaimanapun selalunya yang kita hadapi masalah adalah berkenaan haram cara teknikal ini, di mana zoning dia tak betul ataupun salah guna tanah dia tak betul, sebab saya sendiri ada pengalaman pahit dalam isu ini di mana kilang itu dah wujud lama, dah lama, dan seberang jalan adalah zon industri.

Seberang sini kebetulan tanahnya zon perumahan dan walaupun zon perumahan jauh juga daripada kawasan perumahan. Yang pelik lagi, di sebelah tanah dia kilang di sebelah

adalah zon industri. Apabila dia cuba nak mohon untuk rezoning kepada zon industri, masa itu saya bantu untuk bincang dengan jabatan-jabatan yang berkenaan, dan isu ini di bawa untuk rezoning di State Planning Committee (SPC).

SpeakerEN

Ok, kita faham Yang Berhormat, soalan Yang Berhormat.

Tuan Tan Hong PinDAP · PHSkudaiEN

Dan masalah dia, orang yang bawa proposal ataupun kertas kerja untuk rezoning ini ditolak, dia membantah dalam SPC menyebabkan rezoning ini tak betul, tak boleh jalan, dan saya lihat isu ini adalah birokrasi. Isu ini, selalu kita kata, mahu seribu daya, tak mahu seribu dalih, dan keadaan-keadaan ini menyebabkan kilang ini pada waktu sekarang, walaupun ada order daripada Amerika Syarikat dan sebagainya, tak boleh operasi sebab lesen tak ada. Adakah pihak kerajaan ada statistik-statistik yang manakah satu haram secara teknikal, dan kita bagi fast track, kita bantu dia, dan yang haram dia tutup terus? Adakah kerajaan ada hasrat sebegini, dan adakah data-data statistik-statistik ini dia cukup?

SpeakerEN

Ok, jemput Yang Berhormat.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Terima kasih Skudai. Panjang soalan tambahan. Kerajaan negeri di bawah pimpinan Yang Amat Berhormat Menteri Besar, kita mengadakan mesyuarat SPC ini kerap. Untuk makluman, 22 hari bulan ini pun kita akan mengadakan mesyuarat. Soal guna tanah ini Yang Berhormat, kita boleh lihat semula, kaji semula. Sebab itu, seperti Yang Berhormat beri contoh, sebelah kanan zon industri, sebelah kiri zon industri, kilang yang sebelah itu yang dah beroperasi lama tidak memperolehi kelulusan untuk operasinya.

Di bawah pimpinan Yang Amat Berhormat Datuk Menteri Besar, kita dah tegaskan dari segi zon kegunaan tanah, ini kita boleh sesuaikan. Dan saya nak ambil contoh di Batu Pahat, kalau format pemutihan yang dibuat berkaitan dengan teknikal soal bangunan, kemajuan dan sebagainya, boleh kita luluskan dalam SPC 22 hari bulan ini. Ini akan kita berikan garis panduan kepada seluruh kilang-kilang yang terdapat di seluruh kawasan PBT di Johor. Sebab kita perlu bangkit Yang Berhormat di ketika keadaan yang memerlukan tindakan semua pihak, kelonggaran di beberapa perkaralah.

Tapi, bagi kilang yang menyebabkan pencemaran tak ada toleransi dalam hal ini. Tentang data Yang Berhormat bangkitkan tadi, saya akan dapatkan data yang berkaitan dengan teknikal, yang berkaitan dengan pencemaran, dan saya akan berikan secara bertulis. Terima kasih Yang Berhormat.

Speaker

Soalan seterusnya.

Tuan Tan Hong PinDAP · PHSkudaiEN

Yang Berhormat Mr Speaker, mohon satu lagi.

SpeakerEN

Cukup, cukup, dia nanti lebih masa. Yang Berhormat Parit Yaani, jemput.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHParit YaaniEN

Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. Terima kasih YB Speaker. Dalam tempoh enam hari kita berbahas, baru sekali saya dapat bertanya. Dulu-dulu saya menjawab, hari ini bertanya pun, baru hari ini dapat. Jadi soalan nombor 5, YB Speaker.

Berapakah kes yang direkodkan oleh Johor Islamic Religious Department (JAINJ) berkaitan masalah rumah tangga dan penceraian sepanjang pandemik (bulan 3 hingga sekarang)?

Speaker

Jemput.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi taalawabarakatuh. Sahabat saya Parit Yaani, berhubung perkara yang telah diutarakan, iaitu kes-kes yang melibatkan masalah rumah tangga yang telah pun direkodkan, Yang Berhormat Tuan Speaker, oleh Jabatan Agama Islam Negeri Johor bagi sepanjang tempoh Mac hingga Oktober adalah seperti berikut: Kes-kes rumah tangga yang tidak bertanggungjawab jumlahnya sebanyak 415 kes, kes-kes yang melibatkan keluar rumah sebanyak 180 kes, kes-kes bagi penagihan sebanyak 118 kes, kes-kes poligami 47 kes, kes-kes bagi pengabaian nafkah sebanyak 234 kes, kes-kes bagi penderaan sebanyak 96 kes, kes-kes bagi campur tangan sebanyak 159 kes, kes-kes pelbagai sebanyak 128 kes dan kes bagi masalah kesihatan sebanyak 6 kes, kes sumbang mahram sebanyak 2 kes. Jumlah masalah krisis rumah tangga dari Mac hingga Oktober 2020 adalah sebanyak 383 kes.

Bagi masalah kes-kes penceraian di mana yang ditimbulkan oleh sahabat daripada Parit Yaani, adalah seperti berikut: Bagi data-data kes perceraian bagi negeri Johor bagi bulan Mac hingga Oktober semasa PKP bagi daerah Batu Pahat sebanyak 384 kes, bagi daerah Muar sebanyak 238 kes, bagi daerah Segamat sebanyak 102 kes, bagi daerah Johor Bahru 984 kes, bagi daerah Kluang 256 kes, bagi daerah Pontian sebanyak 250 kes, bagi daerah Kota Tinggi sebanyak 250 kes. Maaf Yang Berhormat Tuan Speaker, bagi daerah Pontian sebanyak 179 kes, bagi daerah Mersing sebanyak 70 kes, bagi daerah Kulai sebanyak 102 kes, bagi daerah Tangkak sebanyak 66 kes. Jumlah perceraian dalam masa Mac hingga Oktober 2020 bagi negeri Johor sebanyak 2,625 kes. Sekian, Yang Berhormat Tuan Speaker.

SpeakerEN

Ya, Parit Yaani.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHParit YaaniEN

Soalan tambahan saya. Kita bagi keluarga Islam, agama Islam ini, saya difahamkan dah memang kita pun pernah menguruskan perkara ini, iaitu tentang kursus perkahwinan. Adakah kursus perkahwinan yang dianjurkan oleh Jabatan Agama tidak berkesan sehingga menyebabkan berlakunya perceraian? Itu soalan yang antara soalannyalah. Dan apakah peranan dan tindakan kaunseling di Jabatan Agama ataupun di bahagian kaunseling di bahagian kehakiman untuk memastikan bahawa kerukunan rumah tangga yang menyebabkan anak-anak terbiar dapat dipastikan, kerukunan rumah tangga itu tak berlaku penceraian? Itu antara persoalan.

SpeakerEN

Jemput YB EXCO.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

Terima kasih Yang Berhormat Parit Yaani. Yang Berhormat Tuan Speaker, sebagai asas kepada apa yang telah dibangkitkan oleh Parit Yaani, perkara pertama dan nak mewujudkan perkara yang melibatkan masalah kursus-kursus perkahwinan, SOP yang kita gunakan sekarang ini ialah dalam tempoh PKP, ialah dengan cara online kursus ini. Dari segi masalah untuk nak menetapkan masalah-masalah yang dihadapi yang ditimbulkan oleh Parit Yaani, Bahagian Pembangunan Keluarga Jabatan Agama Islam Negeri Johor bersama dengan Pejabat Kadi Daerah yang berkenaan akan memanggil mana-mana pasangan yang melibatkan dalam proses perceraian bagi diberikan kaunselor, itu langkah pertama.

Langkah yang kedua, dibuat oleh Bahagian Pembangunan Keluarga dan juga Pejabat Kadi Daerah ialah memanggil keluarga-keluarga yang terlibat bagi mencari rumusan dan juga kaedah-kaedah yang terbaik dalam menyelesaikan masalah yang berbangkit antara pasangan-pasangan terlibat dalam perkara proses perceraian. Dan yang ketiganya, lazimnya pada peringkat akhir, kedua-dua pasangan ini akan dipertemukan untuk majlis kaunseling yang akan diuruskan sendiri oleh Bahagian Mahkamah Syariah dan juga Pejabat Kadi Daerah. Terima kasih.

SpeakerEN

Buluh Kasap, jemput.

Dato’ Zahari bin SaripUMNO · BNBuloh KasapEN

Terima kasih Tuan Speaker. Jika melihat kepada angka yang diberikan oleh YB EXCO tadi, 2,625 perceraian Mac hingga Oktober bagi negeri Johor. Kalau kita andaikan sebuah keluarga mempunyai 2 orang anak, maknanya kita ada 5,250 orang anak yang kita tidak tahu keadaannya selepas ini.

Jadi, saya setuju dengan apa yang dibangkitkan dalam soalan tambahan Parit Yaani tadi, berkenaan dengan kursus perkahwinan. Saya fikir EXCO Agama ataupun Jabatan Agama Islam, adakah kita perlu memikirkan untuk menggubal semula silibus kepada kursus perkahwinan tadi supaya bersesuaian dengan keadaan di mana COVID-19 ini mengajar kita bagaimana keluarga terpaksa duduk di rumah bersama-sama. Dulu mungkin silibus ini tak termasuk kepada duduk bersama begitu lama. Mungkin dulu suami isteri berjauhan, kena sabar, tapi hari ini silibus kena tukar, suami isteri duduk bersama, kena bersabar. Jadi adakah...

SpeakerEN

Sabar duduk bersama...

Dato’ Zahari bin SaripUMNO · BNBuloh KasapEN

Adakah Jabatan Agama mengkaji untuk menggubal silibus ini di masa akan datang? Terima kasih.

SpeakerEN

Duduk sama susah, tak duduk sama pun susah. Jemput YB EXCO.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

Terima kasih Yang Berhormat Buluh Kasap. Memang benar Yang Berhormat Tuan Speaker. Insya-Allah, selewat-lewatnya pada Mac 2021, akan ada satu silibus baru tentang asas-asas mengadakan kursus-kursus perkahwinan ini, insya-Allah. Terima kasih.

SpeakerEN

Soalan seterusnya, Yang Berhormat Kemelah.

Dr. Sulaiman bin Mohd. NorAMANAH · PHKemelahEN

Terima kasih Yang Berhormat Tuan Speaker. Soalan saya, soalan nombor 6.

Dalam tempoh pandemik COVID-19 sehingga kini, berapa jumlah permohonan untuk industri pertanian dan industri ternakan di negeri Johor? Berapa jumlah permohonan tersebut yang telah diluluskan?

SpeakerEN

Jemput YB EXCO.

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

Peace be upon you, and may the mercy and blessings of Allah be upon you. Mr Speaker, during the COVID-19 pandemic up to now, under the Johor State Agriculture Department, one of the agricultural development programmes that has been implemented to help households is the Urban Agriculture Programme.

A sum of RM400,000.00 from federal government funding sources was channelled to the Johor State Agriculture Department in 2020. The assistance takes the form of construction, infrastructure upgrading and project facilities, procurement of agricultural inputs and equipment, and agricultural technology transfer activities. The breakdown of allocation for the community category is RM111,400.00 involving 22 communities. The individual category is RM21,800.00 involving 109 participants. The school category is RM189,700.00 involving 37 schools, and the institution category is RM70,200.00 involving 14 institutions.

The purpose of this development programme is to help urban households and ease the cost of living through their own production of part of the food they need. This programme also complements urban development as a whole. The programme involves residents in urban and peri-urban areas, with the cooperation and involvement of various relevant departments and agencies at state and federal levels. The participation of urban residents, whether government-linked or in the city, in food agricultural production activities can increase individual or household income and in turn reduce the cost of living in the city.

In August 2020, as a result of the COVID-19 pandemic, the Urban Agriculture Programme received a total of 3,569 applications from the community and individual categories. Nevertheless, the allocation received this year is RM800,000.00 under PENJANA, namely the National Economic Recovery Plan. Based on the PENJANA allocation of RM800,000.00, only 928 applications could be processed, consisting of 123 new communities, and additional beneficiaries with a proposed district breakdown, namely 11 communities in Batu Pahat, 21 communities in Johor Bahru, 20 communities in Kluang, 9 in Kota Tinggi, 8 in Kulai, 7 in Mersing, 32 in Muar; 8 in Pontian, Segamat 1, Tangkak 16 communities.

As for individuals, a total of 805 new participants are proposed for Batu Pahat, Johor Bahru, Kluang, Kota Tinggi, Kulai, Mersing, Muar, Pontian, Segamat and Tangkak. As for the 2,641 applications, they are still at the investigation stage for eligibility and will be processed by 2021.

In addition, the government through the Agriculture Department has provided assistance to farmers and farming enterprises affected by this pandemic, especially during the Movement Control Order (PKP). A total of RM150,000.00 was approved by the state government, and distribution in the form of imported agricultural materials was given to the affected farmers. A total of 145 farmers have benefited.

Meanwhile, the Johor State Farmers' Organisation Board (LPP) has allocated funds through the Prihatin Rakyat Economic Stimulus Package (PRE) Projects for 2020 and the special Agro Food project of the Farmers' Organisation (PP) amounting to RM6,791,500.00, covering a crop allocation of RM3,787,000.00 for 176 members of PPK, a livestock allocation of RM1,601,000.00 for 86 members of PPK, an aquaculture allocation of RM305,000.00 for 12 members of PPK, and a marketing allocation of RM1,098,500.00 for 12 PPK.

Secondly, approval for the cash crop projects under the B40 programme, with a total amount of RM1,090,000.00 for 118 members of PPK. Overall, under LPP, the allocation of assistance is RM7,881,500.00, involving 388 members of PPK and 12 PPK buildings.

Meanwhile, the Johor State Veterinary Department received allocations for various development programmes, including assistance programmes for the people. For 2020, a total of 720 applications were received from livestock breeders. A total of 537 applications, or 74.38%, were approved for assistance under various development programmes during the pandemic period of 204. The People's Livestock Programme (PPR) for poultry and ruminant feed assistance, all of which involve an allocation of RM1,917,500.00.00. Thank you.

SpeakerEN

Yes, Kemelah, please ask your supplementary question.

Dr. Sulaiman bin Mohd. NorAMANAH · PHKemelahEN

Thank you, Mr Speaker. Thank you to the Honourable EXCO for the lengthy answer. During the previous MCO, I took the opportunity, space and time available to grow my own vegetables at the back of my house, which is not large, just a very small plot. And thank God now I can enjoy the results, eating what I have grown myself. However, from my experience in managing those plants, I found that there are plants with problems, for example the daun sup, which at one point during the PKP in Segamat cost RM20.00 per kilo, up to RM20.00 per kilo. The tomato plant, before I came here, had just started to grow one fruit. I have tried several times.

So my question is, what is the role of the Agriculture Department in providing encouragement and guidance to those who do not ask for assistance but wish to grow crops on a small scale, and in encouraging them to become self-reliant? Thank you.

SpeakerEN

Please, Honourable Member.

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

Thank you, Honourable Dr. Kemelah. Congratulations on starting, even on a small scale, the Agro Food Programme.

Honourable Kemelah and Members of the House, I would like to inform the Honourable Speaker that every mukim in Johor has a crop extension agent. I want to repeat that. Every mukim in Johor has a crop extension agent. So make the best use of them. They are like the Tok Penghulu. I have met them, and matters of extension in agriculture are their duty.

Secondly, giving to people who ask is indeed a bit difficult, Honourable. If they do not ask at home, they will not receive. So they must ask. But at the very least, the best approach is to have a relationship and rapport with the APT of every mukim. I take this opportunity to say to all Members of the House, for the future development of agro food, among the factors are good relations and networks with the relevant departments. I congratulate and wish every success to Honourable Kemelah.

SpeakerEN

Yes, Kota Iskandar.

Sr. Dzulkefly bin AhmadAMANAH · PHKota IskandarEN

Thank you, Mr Speaker. Thank you for the EXCO's answer. Just now, for those who live in villages or who have more land. Like me, who has lived in Taman Universiti for 22 years, there is not even a small plot left at all, because we have already renovated.

SpeakerEN

In a pot, Honourable... in a pot...

Sr. Dzulkefly bin AhmadAMANAH · PHKota IskandarEN

I have not been able to cover everything. So will the Honourable EXCO agree that we expand this urban agriculture concept by allowing government agencies, especially the Local Authorities and the Islamic Religious Council, which have land reserves within residential areas, for example mosque sites, surau and similar recreational areas that have no funds yet for development, so that we allow these areas to be leased through the following agencies, to enable our friends living in housing estates to undertake urban agriculture, such as mushrooms and fertigation, and if possible, we could do a showcase like the one in Langkawi that I attended before, one container with equivalent yields and 1 acre of land in the field. Thank you, Mr Speaker.

SpeakerEN

Please, Honourable EXCO. Spirit, Honourable, the spirit of agriculture.

Sr. Dzulkefly bin AhmadAMANAH · PHKota Iskandar

Semangat.

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

Thank you, Mr Speaker, the supplementary question and also the question from Kota Iskandar.

I would like to inform that going forward, we indeed encourage community crop programmes. Moreover, the local authorities have also provided RM800,000.00. We have RM4 million. So we have RM4.8 million for community crops that we can implement and allocate to operators.

Firstly, Mr Speaker, farming is for self-sufficiency, that is enough. Secondly, to increase income, and thirdly, for commercial purposes.

Apart from that, I was very interested in the proposal, and indeed that is what is being done now. Community agriculture can enhance muafakat because of cooperation. We are aware of the problems of houses in towns and housing estates. They have green reserves, green land, green areas and greenery, and at the same time there are surau, community halls and so on. What matters most to us is the operator. Who is the operator? Secondly, if there is a site and there is muafakat, no problem. The key point I mentioned earlier is that the target group is committed operators. Secondly, there must be a site. We will provide assistance as much as possible.

So, I encourage that it may not be possible at home, but use the areas around the existing surau, as has happened, for example if I may cite Bandar Baru Uda, through the KRT, NGOs, Youth, the Mosque and Surau Committees, which can take the opportunity in this matter. I encourage everyone to get involved in the agro food programme. Thank you.

SpeakerEN

Next question. Please, Honourable Penggaram.

Puan Gan Peck ChengDAP · PHPenggaramEN

Honourable Mr Speaker, my question is question number 7.

What is the status of the implementation of the Heritage Town Programme and the change of status of the Batu Pahat Municipal Council building on Jalan Pegawai to the Batu Pahat Museum?

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Peace be upon you, and may the mercy and blessings of Allah be upon you. In the name of Allah, the Most Gracious, the Most Merciful. Greetings, thank you, Penggaram. The Heritage Town Programme is a programme run by the Batu Pahat Municipal Council (MPBP) in collaboration with the Centre for Malay World Built Environment Studies (KALAM), UTM. The latest information provided by the Planning Division of the Batu Pahat Municipal Council is that this Heritage Town Programme cannot be implemented this year; it has been postponed due to budget constraints for its implementation. The latest information also given is that it has been postponed and does not yet have funding sources from the federal side.

With regard to the change of status of the Batu Pahat Municipal Council (MPBP) building on Jalan Pegawai to the Batu Pahat Museum, it still cannot be fully implemented. The building is still being used as the MPBP office because the new office is not yet completed. There are several actions that must be carried out before the status of the building can be changed to the Batu Pahat Museum. Namely, after the Batu Pahat Municipal Council moves out, the handover of the building to the Johor Heritage Foundation (Yayasan Warisan Johor) must be carried out first. After that, the Johor Heritage Foundation must submit an application paper to the state government to establish the Batu Pahat Museum, and finally it will be handed over to the Public Works Department (JKR) for the maintenance and filling of the Batu Pahat Museum building. Thank you.

Speaker

Semerah, jemput.

Thank you, Mr Speaker. Thank you, Honourable EXCO. We understand that heritage, or heritage towns, is one of the things we can make into tourism products, and Batu Pahat, Johor Bahru and Muar have different artistic features of heritage architecture. So, will the Johor Heritage Foundation work together with the local authorities and also Tourism Johor to promote the Heritage Town Programme or projects not only in Batu Pahat but in all other districts as a tourism product. Thank you.

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage & Culture · Puteri WangsaEN

Thank you for the question, the answer is yes. So we always welcome proposals from the local authorities to implement, and this Batu Pahat is one of the best examples. Thank you.

Speaker

Penggaram.

Puan Gan Peck ChengDAP · PHPenggaramEN

Honourable Mr Speaker, here I would like to ask the EXCO, roughly how long it would take to obtain the allocation to establish a museum in Batu Pahat.

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Okay, thank you, supplementary question. The construction of the Batu Pahat Museum is estimated to cost RM9 million, with the Public Works Department as the implementing agency. This estimated cost of RM9 million covers not only the building but also the furniture and interior fittings, which is why the figure appears large. This matter was actually brought to the meeting orally by the Honourable EXCO for Housing. After it was brought to the Honourable EXCO for Housing and we have discussed it in detail, there is still no decision, and there are many matters that we still need to examine carefully. The meaning conveyed in that meeting, the Honourable Member himself questioned what would happen to the users there when the building is currently used mostly for public matters such as paying taxes and so on. And when the building was studied, the matters of paying taxes and so on take place alongside the building and are not affected. So as for when, I cannot give an exact figure, because the allocation is sometimes requested this year, next year. Sometimes it depends on the government's priorities. Thank you.

SpeakerEN

Next question, I invite Mahkota, please.

Tuan Muhamad Said bin JonitAMANAH · PHMahkotaEN

Thank you, Honourable Mr Speaker, question number 8.

Many businesses in Kluang have closed and many have lost their jobs due to the COVID-19 pandemic and the weak economy. What are the government's efforts to restore jobs to local residents?

SpeakerEN

Honourable Parit Raja, please.

Puan Nor Rashidah binti RamliUMNO · BNParit RajaEN

Honourable Mr Speaker, my question is number 9.

May the initiatives and allocations that the state government will implement to address the increasing unemployment issue involving youth be stated?

SpeakerEN

Please, Honourable EXCO.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Peace be upon you, and may the mercy and blessings of Allah be upon you. In the name of Allah, the Most Gracious, the Most Merciful. Thank you, Mr Speaker. Allow me to answer the questions of the Honourable Mahkota and the Honourable Parit Raja together, because they are related, namely concerning the government's efforts and initiatives to address the increasing unemployment issue, including among youth. For the information of the Honourable Members, several initiatives to help the people of this state continue working for the sustenance of their livelihood have been implemented and are being actively carried out by the SMI Unit as the implementing agency of the state government. Also involved are various agencies, including GLCs and GLICs. I have already given a thorough explanation on the state government of Johor's initiatives to assist those who have been laid off or are unemployed in this session, during the question-and-answer session yesterday. Therefore, allow me to share those details with the Honourable Members in writing.

Mr Speaker, in answer to the question of the Honourable Mahkota, regarding what are the government's efforts to restore jobs to local residents? Various programmes and initiatives have been planned and will be implemented by the state government to restore jobs to local residents, including in the district of Kluang as well as the Mahkota State seat (DUN Mahkota). For the information of the Honourable Mahkota, from 21 to 23 September 2020, the SMI Unit held the Johor Career Week Programme with the participation of 30 employers from various industrial sectors, who offered a total of 1,120 vacancies.

The programme was held simultaneously at 3 locations covering 3 zones, namely the northern zone at Dewan Maharani Stadium Muar, the central zone at the Labour Office, Kluang, and the southern zone at Galeria UTC, Johor Bahru. In addition, in the budget speech tabled by the Most Honourable Menteri Besar last Thursday, initiatives as well as allocations for economic development purposes and for the benefit of the human capital of the local community were also stated.

As for answering the question of the Honourable Parit Raja regarding the initiatives and allocations that will be implemented by the state government to address the increasing unemployment issue involving youth. I am pleased to inform that the majority of the initiatives or programmes that will be implemented by the government in general are open to and targeted at youth. Basically, individuals aged 18 to 35 years form the largest majority who will receive benefits from the initiatives mentioned earlier. What is important is the self-awareness of youth themselves in seeking added value to continue their future lives. Thank you.

Speaker

Mahkota

Tuan Muhamad Said bin JonitAMANAH · PHMahkotaEN

Thank you, Honourable Member, my supplementary question. We have many types of businesses. For the big ones, perhaps they fall under the EXCO for Larkin, but I would like to focus on the problems of small-scale businesses that may fall under local government. These are very related. Mr Speaker, there are 2 types of small businesses that are focused on those who only earn income based on finding food in the morning and surviving until the evening.

SpeakerEN

Scratch in the morning, eat in the morning; scratch in the evening, eat in the evening.

Tuan Muhamad Said bin JonitAMANAH · PHMahkotaEN

I will use different language instead. Because my question will not ask about a title, but I will speak based on 1 SMS from those involved. That is street vendors, hawkers in small stalls, and vendors at stalls under the local authorities. "Peace be upon you, YB, I have a financial problem", I will just take one example, "can YB help me a little, YB RM2,000 or RM3,000, RM2,000 or RM3,000, please help me YB, since COVID my business has been slow, I have many things I must pay. Thank you YB." I received it at night. Perhaps the person who wrote this, their language may not be impressive to those who are ordinary, but with the sadness of being a People's Representative, thinking about the problems of one example that I received, this is a picture of the people's problems. So I ask that these small-scale traders not be obstructed from doing business wherever they are for now.

Speaker

Soalan.

Tuan Muhamad Said bin JonitAMANAH · PHMahkotaEN

My question is just that. I ask that the local authorities, or any party, and as I said when debating the 2021 Budget, I said that in Kluang, in Mahkota, there are still foreign workers working in restaurants, working at petrol pumps and other places where those job opportunities should now be given to local people. Thank you.

SpeakerEN

Please, Honourable EXCO.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Thank you, my friend, the State Assemblyman for Mahkota. This is the lament that all Representatives receive from every corner, becoming...

SpeakerEN

Larkin included too.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Larkin included, correct. So what I wish to share here, as stated in my earlier answer on human capital, can be realised through the launch and implementation of various initiatives for the parties concerned. To help the hawkers and small traders who have lost their livelihood. Why? Because they are prohibited from trading in certain areas where they do not have a business licence. Indeed this has happened in my own area too. So the state government has taken note and a joint effort, cooperation with the EXCO PBT that we are forming, to help these groups so that they can continue living and continue their businesses, continue to carry on their daily livelihood, so that they are given time, given a period. We must not use an overly drastic approach, and for them, we are not intending to legalise illegal or unlicensed businesses. And I also plan to hold a regularisation (pemutihan) process, but please do not let my words on this regularisation process be manipulated or misinterpreted. Do not regard the pemutihan as enforcement; pemutihan means we will try to help them. First, we will help them obtain business licences. We will register them. I will work with the Companies Commission of Malaysia (SSM) to carry out registration as quickly as possible, and we will provide them with simple management. And once they are registered, I hope the PBT will be able to give some leniency or facilitation in cooperation to accommodate them, and allow them to trade and operate lawfully. That is my hope, and insya-Allah, I believe the EXCO PBT will be able to assist me in this matter. Thank you.

Speaker

Pekan Nanas.

Tuan Yeo Tung SiongDAP · PHPekan NanasEN

Honourable Mr Speaker, unemployment will become an increasingly serious issue during the COVID outbreak. For the government, in fact, we can obtain a lot of data through agencies such as the Employees Provident Fund (EPF) and the Social Security Organisation (SOCSO). And if they are unemployed, they may have stopped making EPF and SOCSO contributions every month. My question is, does the government make use of EPF or SOCSO contribution data, or any other means, to collect information on the unemployed? And earlier, through the reply from the Honourable EXCO member, we found that there are indeed many efforts being carried out, such as holding career carnivals, but at this critical time, old methods were indeed effective, but are we prepared to take more initiatives, or be more active, more aggressive, or however, so that we proactively obtain data from the unemployed and contact them to offer them job opportunities. Thank you.

SpeakerEN

Please, Honourable EXCO member.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Thank you, Pekan Nanas. I think I already answered this question yesterday. I am drawn to the words aggressive and active. For the information of Pekan Nanas, here we are super active, super aggressive. We work every day, sometimes regardless of the time. And we face the problems of unemployment and entrepreneurs every day. If the eyes find it heavy to see, the shoulders bear an even heavier load. So, on the question of unemployment, let me give one example. Suppose, for 1,000 jobs that we arrange, we gather industry players to offer them, look for job opportunities, look for healthy industry players that offer 1,000 vacancies, while 3,000 are retrenched. So this matter, its ratio, if it is 1:3, we will not be able to cope. But we will only try to mitigate, to mitigate it so as to lower this figure, depending on the COVID-19 pandemic situation. If it does not drag on, I believe insya-Allah our efforts will eventually be realised. Thank you.

SpeakerEN

Yes, Parit Raja. Supplementary question.

Puan Nor Rashidah Binti RamliUMNO · BNParit RajaEN

Honourable Mr Speaker, thank you to the Honourable EXCO member for the answer. So I ask that you state whether the good programmes under this Johor Human Capital (Modal Insan Johor), such as the Johor Skills Training programme (Latihan Kemahiran Johor) and the Johor Career Drive (Gerak Kerjaya Johor), will be implemented across all districts in the state of Johor or will only focus on the city of Johor Bahru.

SpeakerEN

Please, Honourable EXCO member.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Thank you, Honourable Parit Raja. A very cute question. For information, the state government constantly monitors and seriously takes into account the current situation regarding the rising rate of unemployment and also those who have lost their jobs.

Okay. And we have taken proactive steps holistically in planning and subsequently implementing efforts to assist these groups. I am pleased to inform you that the implementation schedule for the next Johor Human Capital programmes has been set, ha, it has been set across all districts, but the nearest one after this is in Batu Pahat, including the area of the Parit Raja State Constituency, Honourable. So I hope we will meet there. Thank you.

SpeakerEN

The next question, Honourable Penawar, please.

Thank you, Honourable Mr Speaker. It is already sweaty this early in the morning. My question is number 10.

Students from poor families or B40 families are among those affected by the COVID-19 Pandemic. Does YPKDT (Yayasan Pembangunan Keluarga Darul Takzim, Darul Takzim Family Development Foundation) provide suitable programmes for these students?

SpeakerEN

A pantun from yesterday, a pantun, yes. Please, Honourable EXCO member.

Puan Zaiton binti Haji IsmailUMNO · BNChairman of the Committee on Women's Development, Family and Community · Sungai BalangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace and blessings of Allah be upon you. Thank you, Honourable Penawar. Honourable Mr Speaker, apart from the Johor State Education Department (Jabatan Pendidikan Negeri Johor) and the Johor Education Foundation (Yayasan Pelajaran Johor), the Johor state government through YPKDT also takes the initiative of designing suitable programmes for students from B40 families through the Human Capital Mindset Transformation Programme, namely PRO-MIS, for secondary school students, and the Emotional Personality Development and Self-Exploration Programme, namely PRO-SEED, for primary school students. For 2020, the PRO-MIS and PRO-SEED programmes were implemented involving students from selected communities, consisting of poor families or B40. This programme covers all districts in the state of Johor, and a total of 220 participants have joined the PRO-MIS programme and 220 participants for the PRO-SEED programme. This programme is held out of the government's concern to improve the socio-economic status of the people. This programme aims to break the chain of poverty among low-income families in order to raise their standard of living. The involvement of these children aims to make them agents of change in building a quality family institution. YPKDT designed this programme using an action oriented approach, with permission. It is carried out through the formation of identity, while innovating to seek opportunities that can be exploited to raise the socio-economic status of families in the future. Moreover, in line with this COVID-19 pandemic, YPKDT has also presented donations to participants who previously took part in the PROMIS and PROSEED programmes.

A total of 70 donation recipients for PRO-MIS participants and a total of 75 donations for PRO-SEED participants. Thank you.

SpeakerEN

Yes, Penawar, please. Supplementary question.

Thank you, Honourable Mr Speaker, thank you EXCO member. Whose bird perches on the branch, with permission, I put forward a supplementary question.

SpeakerEN

Please, Honourable Member.

Honourable Mr Speaker,

SpeakerEN

Arab words, Arab words don't know pantun.

Arab-dipped clever. Apart from the programmes mentioned by the Honourable Member, does YPK organise skills programmes to generate income for young people who cannot enter an IPTA or IPTS? And does it only provide skills to them without giving guidance so that they can go on to succeed in business. Thank you.

SpeakerEN

Please, Honourable EXCO member.

Puan Zaiton binti Haji IsmailUMNO · BNChairman of the Committee on Women's Development, Family and Community · Sungai BalangEN

Thank you, Honourable Penawar. Honourable Mr Speaker, next year the state government through YPKDT will also focus on children from low-income families who have not succeeded in continuing their education at any educational institution, so that they may be given skills and be able to earn an income. YPKDT has established a new programme known as the Business Starter Scheme, namely PEMULA. Through this programme, YPKDT will work with Giat MARA to provide two types of courses to young school leavers. These courses will focus on hairdressing and mechanical courses. The course will be implemented over a period of 6 months as a requirement for qualifying for a Skills Certificate. In the end, we target these participants to carry out small-scale businesses using the mobile-preneur approach. Thank you.

SpeakerEN

The next question, Honourable Skudai, please.

Tuan Tan Hong PinDAP · PHSkudaiEN

Peace and greetings, Honourable Mr Speaker. My question is number 11.

State the effectiveness of the Source Separation of Solid Waste Policy (Dasar Pengasingan Di Punca) by stating the tonnage of waste recycled by each local authority (PBT) according to their respective categories every year from 2015 to September 2020, as well as the government's strategy to increase the recycling rate in every PBT.

SpeakerEN

Please, Honourable EXCO member.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Peace be upon you and the mercy and blessings of Allah. Peace and greetings. Prosperous greetings to Johor. Honourable Mr Speaker, thank you to the Honourable Skudai who asked about the effectiveness of the Source Separation of Solid Waste Policy (Dasar Pengasingan Di Punca) in terms of tan for each PBT, and what strategy the government has to increase the recycling rate in every PBT. Honourable Mr Speaker, from 1 June 2016 to 31 August 2020, a total of 31,289 friendly reminder letters and 85 compound notices have been issued by the Solid Waste Management and Public Cleansing Corporation (SWCorp) for the entire state of Johor. A total of 201,140 premises have been inspected, involving 1,428 neighbourhoods. For the Honourable Member's information, the Source Separation of Solid Waste (SAS) campaign was implemented in September 2015 and to date overall shows an increase rate of 36%. For the Honourable Member's information, if we look at the achievement across the country as a comparison, the national recycling achievement rate in 2015 was 15.7%, but in 2020 it is 30.67%. This upward trend, the total amount of recycling collected in the state of Johor shows that public understanding regarding solid waste separation is improving, and this good effort will be implemented continuously.

One example I want to mention in this august House, Honourable Member, is that MBJB increased its recycling rate from 2015 to 2020 at a rate of 1,728%. Let me read out, in terms of tonnage by PBT, Honourable Member, briefly and quickly. MBJB, 98 tan. MPKu, 41, MDBP 70, MBIP 89, Pasir Gudang 17, and the overall total for the state of Johor is 879 tan. The strategy we have made, or the initiatives currently being carried out, are to further intensify campaigns and briefings on solid waste separation at all levels, such as World Clean Up Day. Trash to cash activities, waste to art, recycling in schools, and also our recycle activities. Apart from that, increasing the number of recycling bins in residential areas to encourage the disposal of recyclable materials, and exposure to the e-waste recycling programme, and the gazetting of the Solid Waste and Public Cleansing Management Regulations, and the solid waste and public cleansing management regulations stipulate that waste producers and waste collectors must ensure that solid waste disposed of is separated first, and that the waste generated must be recorded. These are some of the initiatives that have been carried out at state level, and insya-Allah, for the information of this august House, one of the matters I focus on within my portfolio under Local Government is the issue of waste, Honourable Member. And we want to make this waste into waste to energy and also waste to wealth, so that this waste can be used for energy and also become money in the times to come. That is all, Honourable Mr Speaker.

SpeakerEN

Okay, I will conclude questions for this morning. If there are any listed questions not yet answered orally, they will be answered in writing during the same sitting. I adjourn until 11.20 am.

The sitting was adjourned at 11.00 am.

The sitting resumed at 11.20 am.

Continuation of debate on the second reading of the Appropriation (2021) Bill for the year 2020.Bill

SpeakerEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace and blessings of Allah be upon you. Honourable Members, the continuation of the Debate on the Second Reading of the Appropriation Bill 2021 (Enakmen Perbekalan 2021) Year 2020 now resumes. The winding-up by the Honourable Chairmen of the Committees. I invite the Honourable Chairman of the Committee on Unity, Trade and Consumer Affairs. Please.

Dr. Chong Fat FullPKR · PHChairman of the Committee on Unity, Trade and Consumer Affairs · PemanisEN

Salam perpaduan dan salam Makmur Johor. Honourable Mr Speaker, Members of the State Executive Council and Honourable Members. First of all, in conjunction with the celebration of the birthday of Duli Yang Maha Mulia Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan bagi Negeri Jajahan Takluk Johor Darul Takzim, the 62nd on 22 November 2020. Patik takes this opportunity to humbly offer my deepest love and pray that Duli Yang Maha Mulia Tuanku and the state of Johor remain peaceful, prosperous and progressive, and that the people live in harmony under the patronage of Duli Yang Maha Mulia Tuanku.

Honourable Mr Speaker, firstly, I would like to record my highest appreciation and thanks to every Member of the House who has given constructive views, suggestions and criticism to the government, especially on several issues under my portfolio, which covers unity, trade and consumer affairs of the state of Johor. I also would like to take this opportunity to extend my heartfelt congratulations to the Most Honourable Datuk Haji Hasni bin Mohammad on the tabling of the Johor Budget 2021 last Thursday.

Honourable Mr Speaker, allow me to recite a pantun briefly.

Cantiknya gelang pada ukiran, diserikan pula emas permata, berdaya tahan demi kemakmuran, inilah tema belanjawan Kita.

(The House applauds.) Honourable Mr Speaker, my office is committed to strengthening several machineries and improving programmes through cooperation with the Department of National Unity and National Integration of the Johor State and the Ministry of Trade and Consumer Affairs and State, KPDNHP, as follows:

1. Bersatu yang pertama, enhancing the organisation of the Communications For Behavior Impact (COMBI) and Komuniti Sihat Perkasa Negara (KOSPEN) programmes through Rukun Tetangga Areas (KRT) with the cooperation of the Ministry of Health Malaysia.

2. For KRTs located along the Johor coastline that serve as entry routes for Illegal Immigrants (PATI), the Volunteer Patrol Scheme (SRS) will be strengthened and, for safe communities, the Safe Community Concept through initiatives such as One Community One Police and the e-Ronda programme.

3. Increasing the participation of Chinese and Indian children in Tadika Perpaduan.

4. Adding to and strengthening the role of Community Mediation Centres.

5. Food bank assistance in which KPDNHP is one of the agencies involved.

6. The Jualan Makmur Johor will continue and, for the information of Mr Speaker, the following efforts will be implemented through social media, namely:

i. Assisting the public with company registration through the Companies Commission of Malaysia (SSM).

ii. Increasing awareness of franchise business.

iii. MyIPO (Intellectual Property Corporation).

So, Honourable Bekok, in his debate, requested that all programmes must involve all races in order to inject the spirit of unity. And for the information of the Honourable Member, efforts have already begun through the Department of Unity, where programmes organised and the appointment of committees (RT) must involve all races as per the guidelines that have been provided.

In addition, the Department of Unity is also studying proposals submitted by researchers from Universiti Teknologi Malaysia (UTM) to open offers for appointing Chinese and Indian caregivers at Tadika Perpaduan as a step to attract the interest of races other than Malays to send their children to Tadika Perpaduan.

And Honourable Mengkibol also raised the issue regarding the directive to remove business signboards by the local authority (PBT), and my side went down to the ground after receiving complaints on this issue, and there is a possibility that some parties are trying to take advantage of this to raise racial issues. Therefore, my office will coordinate with the Honourable EXCO for Housing and Local Government to study the existing policies and laws on these matters.

Honourable Mr Speaker and Honourable Members, throughout the debate by the Honourable Members, many among the Honourable Members also raised matters related to the social impacts arising from the COVID-19 pandemic crisis, such as Honourable Maharani, Honourable Johor Jaya, Honourable Yong Peng, Honourable Stulang, Honourable Paloh and many more.

For the information of Honourable Mr Speaker, there are several Rukun Tetangga Areas (KRT) that have set up Community Mediation Centres, where these centres play a role in helping the community resolve problems they face. The mediators appointed at these centres are those who are certified, qualified and have been given proper training, to help not only with problems faced in the community but also with cases of domestic violence, and of course including the issue the Honourable Stulang raised about birds or whatever, and the Department of Unity will cooperate with the Honourable EXCO for Women, Family and Community Development as well as the Honourable EXCO for Health and Environment to assist with this problem.

Honourable Mr Speaker and Honourable Member, Honourable Endau and Pasir Raja in his debate touched on the food bank assistance initiative for those in great need. For the information of Honourable Mr Speaker, this initiative will be coordinated by the Office of the Most Honourable Menteri Besar, the Johor State Economic Planning Unit (BPEN), the State Secretariat (SUK) under Management Services, and the Office of the Johor State Ministry of Domestic Trade and Consumer Affairs (KPDNHP). And my office will ensure that this initiative is implemented as well as possible and takes into account the views conveyed by the people's representatives. For the information of Honourable Mr Speaker, the government is planning for this food bank assistance to be implemented in an orderly and targeted manner, where people who are truly affected will receive assistance according to need.

Honourable Mr Speaker, Honourable Bentayan provided a suggestion to improve the Jualan Makmur Johor (JMJ) initiative, where Honourable Bentayan proposed that cash vouchers be given to B40 people who do not know how to use online services and, in turn, help local traders and retailers. My office accepts this suggestion and will study the feasibility of its implementation. And for the information of Honourable Mr Speaker, as of 30 days of November 2020, a total of 39,500 consumers have successfully benefited from this programme. Vouchers amounting to RM20.00 have been credited to all consumers with a total of RM790,000.00 as allocated by the Johor State Government.

Honourable Panti has made a suggestion and debate regarding e-commerce platforms. My office agrees and encourages traders, especially in the retail sector, to carry out their business online, and my office will study the matters highlighted by Honourable Panti, so that these traders are not charged fees that could cause them losses when using e-commerce platforms.

Honourable Mr Speaker, lastly I would like to thank Honourable Mr Speaker for giving me the opportunity to wind up the debate on Budget 2021, particularly for the portfolio of the Committee for Unity, Trade and Consumer Affairs of the State of Johor. And thank you to the Most Honourable Menteri Besar and all Honourable Members for your concern, especially for these two sectors. And my office will give full attention to all criticisms, suggestions and comments, and will strive to implement every suitable suggestion that has been submitted to me. Thank you.

SpeakerEN

Yes, thank you to the Chairman of the Committee for Unity, Trade and Consumer Affairs. Next, I invite the Honourable Chairman of the Committee for Health and Environment. Please.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Peace and prosperity greetings to Johor. Thank you, Mr Speaker. I extend my highest appreciation and thanks for the opportunity given to me to take part in the winding-up debate at the Third Budget Meeting of the Third Meeting of the Fourteenth Johor State Legislative Assembly. This humble servant wishes to record the deepest respect and highest gratitude to His Majesty Sultan Ibrahim Ibni Sultan Iskandar, Sultan of the State and Territories of Johor Darul Ta'zim, on the occasion of His Majesty's birthday on 22 November last. May the State of Johor Darul Ta'zim continue to prosper and be peaceful under the patronage of His Majesty's rule.

I am also pleased to record my warmest congratulations to the state government administration under the leadership of the Honourable Menteri Besar, who tabled the 2021 Johor State Budget with the theme Berdaya Tahan Demi Kemakmuran. This year's budget is, with permission, unprecedented. This budget will determine whether our economy in Johor is able to rebound as before or otherwise.

Will our society be able to live a normal life as before, post-COVID-19, or will we live in a new normal phase? While we fight this outbreak, some among us have been struck by hardship. There are also those who hope for a second chance. Therefore, the budget brought by the Honourable Menteri Besar will bring Johor towards resilience for the future post-COVID-19 and ensure the welfare of the people is not neglected, or more precisely, no Johorean left behind.

Mr Speaker, in 2020 we were shocked by an enemy attack that cannot be seen with the naked eye, named COVID-19. Its emergence in Malaysia was such that since its arrival we have learned much and gained a thousand and one experiences, to the extent that it was the first time in history. It is an illness that forced us to face a new way of life, or more precisely a new normal, in order to curb COVID-19.

Throughout the sittings of this House from 26 November until today, I have seen the various feedback given, whether in the form of questions, proposals, support or criticism raised by those on the other side, as well as by my colleagues on this side, and I have taken note. Before I answer the questions of the Honourable Members, I would also like to take a little time to extend our highest appreciation and thanks to our front liners.

The Health Department, the Police, the Malaysian Armed Forces, the Malaysian Civil Defence Force (APM), the People's Volunteer Corps (RELA) and the various agencies that play a major role in looking after us, whether in terms of security, health, or otherwise, as we face the COVID-19 pandemic, without tiring. Thank you. I understand the hardship and fatigue of our front liners in guarding our borders and giving priority to the health of us all.

I have seen it with my own eyes and have been with them. Their hardship and fatigue should not be overlooked; rather, they should be given due appreciation for their services to this state. As an appreciation for the sacrifice of their time and selves, for the safety and health of us all, the 2021 Johor Budget, through the Johor Madani agenda as stated by the Honourable Menteri Besar, has allocated a total of RM6 million, excluding the commitment by the federal government, to the front liners whom we hold in high esteem.

I hope this allocation can give some strength to our front liners to continue fighting COVID-19 together. Mr Speaker, in this sitting and to the Honourable Members, apart from curbing COVID-19, let us not forget an enemy that is distant but even more real, namely climate change and environmental pollution. In the tabling of the 2021 Budget, the Honourable Menteri Besar emphasised the Johor Madani agenda, which is to bring the people of Johor to greater progress, and the environment is among the pillars driving that agenda.

As for the environmental context, this budget has a vision of bringing Johor to face climate change and to increase forest conservation. A total of 17 initiatives were highlighted and 4 matters, namely:

1. Forest and biodiversity conservation. 2. Ecosystem and river conservation. 3. Renewable energy, namely renewal energy, and solid waste. 4. Low-carbon activities.

What I can say is that this budget is a new platform for overcoming health and environmental problems. This budget is in the form of a resilience framework, a future proof, with permission, in facing COVID-19, climate change and the environment.

Mr Speaker, in responding to the issue raised by the Honourable Semerah regarding the preparedness of the Ministry of Health Malaysia (KKM), particularly the Johor State Health Department. In the state of Johor, there are 6 specialist hospitals and one special institution that provides psychiatric specialist services. At present, there are 29 psychiatric specialists in the state of Johor distributed as follows: Hospital Permai, 11 persons; Hospital Sultanah Aminah, 5 persons; Hospital Sultan Ismail, 3 persons; Hospital Sultanah Nora Ismail Batu Pahat, 4 persons; Hospital Pakar Sultanah Fatimah Muar, 2 persons; Hospital Segamat, 2 persons; Hospital Enche Besar Hajah Kalsom Kluang, 2 persons. For hospitals without specialists, there are visits by psychiatric specialists to the districts as follows: Hospital Mersing once a month; Hospital Kota Tinggi, three times a month; Hospital Kulai, twice a month; Hospital Tangkak, twice a month.

In 2021, there is a plan to add specialists for the districts of Johor Bahru, Muar and Segamat.

For mental health, among the steps taken is empowering the public to be more proactive in obtaining information on addressing mental health problems, namely coping mechanisms, through various webinars provided by government bodies or interested NGO agencies. The state government is also, currently, proposing a proposal to establish a special committee for which a working paper is being developed to be tabled to the state government in 2021. The proposal is named the Healthy Mind Squad Team (HeMS Team). It will involve government departments that have Psychologist Officer posts, such as the Health Department, Education, the State Secretariat (SUK), the Department of Social Welfare (JKM), the National Population and Family Development Board (LPPKN), and any other departments with Psychologist Officers.

The Honourable Semerah has also asked about vaccines. Mr Speaker, for information, four working committees have been established at the level of the Ministry of Health Malaysia to ensure the supply of COVID-19 vaccines is obtained promptly, safely and perfectly. One of the procurement plans relates to the storage of the vaccines. A coordination meeting on the details of this procurement plan was also held on 2 December 2020 for the purpose of coordination. The purchase of COVID-19 vaccines will be made based on consideration of the overall cost to ensure the vaccine selected is safe, effective, of quality and provides the best value return to the government. Vaccines must be registered with the National Pharmaceutical Regulatory Division before they can be procured. The method of distribution and storage of vaccines depends on the type of vaccine, the quantity procured and the storage temperature range. The availability of health facilities to store vaccines below minus 70 degrees Celsius and the provision of additional requirements in terms of storage equipment and infrastructure infrastructure are being vigorously pursued. The management of the cold chain must be carried out in line with the good distribution practice guidelines, namely good distribution practice, issued by the National Pharmacy Division so that the quality of the vaccines is always assured.

Mr Speaker, the issue of dengue has indeed been a concern of the Health Department. Dengue fever is among the highest disease burdens in the state of Johor. The Johor State Health Department is always committed to efforts to combat dengue fever. Control of dengue fever requires cooperation from all parties, especially the local community, because it is very closely related to behaviour. The Johor state government has given a high commitment to the Johor State Health Department as expressed in the launch of the Johor Perangi Denggi Programme. In addition, assistance from agencies such as the local authorities (PBT) has helped in dengue control activities and provided resource assistance.

Since the launch of Johor Perangi Denggi, dengue cases have dropped from 39 cases a week to 160 cases a week. And among the efforts undertaken is continuous vector control activity for every case and outbreak, and this activity is also assisted by the relevant agencies. Other efforts include education and social mobilisation together with inter-agencies through the Johor Perangi Denggi Campaign launched, including programmes such as One Hour Johor Clean Up, I-PAD Program iaitu Inisiatif Pemimpin Advokasi Denggi, Komuniti Denggi Watcher, Kempen Rumahku Bersih Bebas Denggi, Program Gotong-Royong Mega Perangi Denggi, Media Campaign Empowerment, with permission, Program Masjid Bebas Denggi and also COMBI.

Apart from that, various health education activities are also carried out to raise public awareness, where a total of 1,165 public announcements and 116 infographics on ways to prevent dengue fever have been carried out, 118,274 leaflets and posters have been distributed, three interview sessions and 11 videos have been produced. At the same time, enforcement operations under the Destruction of Disease-Bearing Insects Act 1976 have also been carried out. A total of 3,087 compounds have been issued with the compound value offered amounting to RM1,548,500.00, and 25 cases were brought and prosecuted in court. And in terms of the district level, the District Action Council (MTD) will be the overall driver of the Johor Perangi Denggi programme.

Mr Speaker, the issue raised by the Honourable Yong Peng concerns a case of a dengue death on 21 September 2020 in Taman Seri Aman, Yong Peng. Dengue fever arises from various factors. Therefore, it requires cooperation from various parties to ensure dengue fever can be controlled.

Mr Speaker, for the information of the Honourable Perling and all Members of the House, among the constraints in inspecting individual premises is access into the premises due to various factors such as occupants working, working out elsewhere, empty houses and so on. It cannot be denied that there are premises that cannot be entered because the occupants work in Singapore or Singapore citizens cannot enter Malaysia. The health authorities will try to locate the owners with the help of neighbours and community leaders to inform the owners about the need to clean up the house. For premises that still cannot be entered even after follow-up visits have been carried out, the Destruction of Disease-Bearing Insects Act 1975 will be used for the purpose of prevention and control of dengue fever. For this purpose, notices under section 5A and the tracing of owners to be contacted will be carried out.

Mr Speaker, regarding the issue of the condition of health facilities in hospitals throughout the state of Johor raised by the Honourable Semerah, I would like to share that for 2020, the Ministry of Health Malaysia approved development allocations under Project Item 00600 Upgrading, Alteration and Repair for the state of Johor amounting to RM13,348,074.31 covering 90 projects. However, only RM8,248,074.31 has had warrants issued this year, taking into account projects that can be implemented and paid within the current year, covering 92 projects in total. The total allocation approved for this year 2020 was also found to have increased by 276.08% compared with the total allocation approved in 2019.

The distribution of allocations for the facilities involved is as follows: for hospital facilities, the Ministry of Health Malaysia has approved an allocation totalling RM8,239,104.60 covering 51 projects. For health clinic facilities, the allocation distributed for repair and upgrading purposes totals RM2,298,012.40. I went through to the cent carefully for the Honourable Semerah, which involves 9 projects. Next, allocations were also distributed to village clinic facilities totalling RM511,921.21 involving 7 village clinics and 7 dental clinics totalling RM498,003.10. To look after the welfare of Ministry of Health Malaysia staff occupying quarters, allocations for quarters repairs were also channelled, totalling RM646,880.00, involving repairs to 16 quarter units. Next, KKM also approved allocations for the support sector for the purpose of continuity of service quality to the public, including upgrading laboratories, the provision of wellness up and others, covering 7 projects totalling RM1,242,353.00.

The proposal for village clinics to be used as a place for collecting follow-up medication by appointment is also one of the ways to reduce congestion at the pharmacy counter. The value-added service suitable to be adopted at the village clinic counter is a method of local follow-up medication supply where the medication of patients who already have appointments for the second and subsequent collection will be packed and sent to the village clinics that have been identified, and the patients will then collect their medication at that clinic. Not only patients in the area concerned, but it may also be offered to patients living in nearby areas.

Mr Speaker, the Honourable Tiram raised an issue relating to charges and facilities. For the information of all, Ministry of Health Malaysia hospitals carry out customer satisfaction surveys on the services provided by hospitals every year. Data is collected through the SEQUAL method, and the survey results for the state of Johor for 2019 show that 96.1% of customers were satisfied with the services provided. Meanwhile, the survey in 2018 showed that 97.8% of customers were satisfied with the services provided.

Every year the Ministry of Health Malaysia approves the purchase of medical equipment for additional purposes based on increased workload and service development, as well as the replacement of equipment that has been disposed of. However, approval of purchases is carried out in stages. Although posts are insufficient for existing services, to address the shortage of staff, since 2016 the Ministry of Health Malaysia has obtained posts through contract appointments comprising various categories of posts including medical officers, dental officers, pharmacists, nurses, medical assistants and associated health science officers.

For information, the charges imposed by private hospitals in this country are controlled under the Private Healthcare Facilities and Services Act 1988 through Schedule 13 of the Private Healthcare Facilities and Services Regulations. These Regulations control, among other things, consultation fees and procedure fees, namely fees for procedures carried out on patients. There are indeed minimum and maximum limits set for those consultation fees. For procedure fees, only the maximum rate has been set.

Mr Speaker, regarding the issue debated by the Honourable Pulai Sebatang on targeted COVID-19 screening tests, especially for mukims or areas experiencing a sudden increase. The Health Department has set several criteria as a guide for health personnel at health facilities to carry out risk assessments and COVID-19 tests where necessary on patients who come to health facilities. That is, customers who come with fever symptoms, have a history of travel to risk areas especially red zones, a history of contact with positive COVID-19 cases, or have family members, colleagues, hostels, schools or any institution that has a symptomatic cluster. In addition, for areas declared as Enhanced Movement Control Order (PKPD) areas, COVID-19 tests will be carried out on all occupants of those areas, as was the case during the PKPD in Bandar Baru Ibrahim Majid and the Malaysian Health Skills Institute.

Mr Speaker, the Honourable Skudai asked about the pandan smell in the river. The Department of Environment has carried out inspections of premises that have the potential to contribute to pollution and the pandan odour problem in raw water located in the Johor River Basin, including the industrial area of Bandar Tenggara and industrial areas around Kulai – Kota Tinggi, around Jalan Kulai – Kota Tinggi. Based on inspections of a total of 17 premises in the area, the Department of Environment has taken action by issuing a total of 8 compound offers amounting to RM16,000.00 together with 5 notices of rectification orders under Sections 31 and 37 of the Environmental Quality Act. However, the source of the pandan-smelling water has not yet been identified, and investigation and monitoring of the area will continue.

Secondly, regarding the Sungai Kopok raised by the Honourable Tiram, the Department of Environment takes the issue of river pollution seriously because it has the potential to cause water sources to become polluted, harm the local ecosystem and also affect the daily lives of the community in general. To enforce the Environmental Quality Act 1974, the Department of Environment has carried out continuous inspections of industrial premises operating in the Tanjung Langsat industrial area, including those discharging effluent into Sungai Daing and Sungai Kopok at Kampung Perigi Acheh. From 2019 until now, enforcement actions taken against industries that do not comply with the Environmental Quality Act include 52 notices of orders, 150 compounds, 2 seizures of operational equipment and 10 investigation papers prepared for prosecution action.

Mr Speaker, issues relating to rivers have begun to receive attention from various parties recently, who want the state government to take certain actions to ensure the problem of river pollution is addressed wisely and effectively. For example, the issue of chemical pollution in the Sungai Kim Kim has become a major issue until now. The Sungai Kim-Kim traverses the main development areas in Johor Bahru and is categorised as highly polluted. In addition, the issue of chemical pollution in Sungai Kim Kim that occurred last year is still a topic of public conversation until now.

This matter was raised by the Honourable Permas Jaya. The federal government has carried out a Pollution Carrying Capacity study in Pasir Gudang in 2019, involving technical expertise from Universiti Kebangsaan Malaysia as the implementer and jointly involving the inputs of various state government agencies. This study involves the sharing of information between the state and federal governments so that the same information can be obtained from all departments and agencies, and so that the results of the study can be shared together and solution actions can be taken.

Furthermore, the Kim Kim River Rehabilitation Plan initiative has been approved under state government allocations amounting to RM500,000.00. This allocation will be channelled to JPS Johor and will involve cooperation with the Johor Department of Environment and 4 universities. This initiative will involve the development of an Eco-Park Plan, a public awareness programme for local communities and school students, as well as health aspects and emergency guidance should a disaster occur. This initiative will be carried out continuously every year in phases, and the first phase in 2021 will involve an allocation of RM500,000.00. The rehabilitation planning for Sungai Kim-Kim needs to be more holistic in order to be effective. And therefore, this initiative involving the cooperation of 4 universities, namely UTM, UTHM, UTEM and USIM, is able to rehabilitate Sungai Kim-Kim in stages.

Mr Speaker, the Honourable Penggaram is interested in the Zero Waste Programme to be implemented by the National Park Corporation. We will ensure this programme does not become a flash in the pan, as the Honourable Penggaram meant, and I would also like to state here that this programme will be carried out at Kampung Benteng, Air Masin Kukup Laut and Pulau Kukup. The Zero Waste Programme is implemented to reduce the pollution of floating solid waste in the Pulau Kukup area and its surroundings. A clean and quality environment can also encourage eco-tourism in the Kukup area, which is why we take this programme seriously.

Mr Speaker, regarding the issue of the Johor Elephant Sanctuary raised by the Honourable Senggarang and the Honourable Members from the Kota Tinggi district, the Honourable Panti, the Honourable Johor Lama and Sedili. For information, for the Johor Elephant Sanctuary Phase 2 development project, 2019-2023, in 2021 the federal government, through the Department of Wildlife and National Parks (PERHILITAN), will allocate a total of RM7 million to carry out projects such as the following:

1. Development of visitor facility resources. 2. Development of habitat enrichment resources. 3. Construction of physical barriers and elephant electric fence systems. 4. Procurement of training and research equipment related to elephants. 5. Joint programmes with local communities and preparation of a management plan.

This large development project investment reflects the government's seriousness in reducing the problem of elephant disturbance to agricultural areas throughout the state of Johor. In addition, the development of visitor facilities will also function as eco-tourism.

Mr Speaker, for information, the function of the Johor Elephant Sanctuary is in-situ elephant management, which has indeed been functioning since the JES project was handed over to the department on 13 September 2020. A total of 13 PERHILITAN staff have also been posted so far. They will carry out elephant management programmes, especially involving elephant capture operations, monitoring of elephant herds, management of elephant electric fence systems, conducting engagement sessions with the stakeholders involved, and carrying out public awareness programmes related to elephants.

We are well aware that the incidence of conflict between humans and wildlife such as elephants in agricultural areas is due to the lack of food sources in the forest. In addition, the main types of agriculture planted, such as oil palm, banana and coconut, are favourite foods of elephants. Therefore, I strongly agree with the view of the Honourable Senggarang that forest clearing and wildlife habitat should be stopped or, if it must still be done, various habitat restoration efforts must be carried out to ensure the food sources of this wildlife remain assured. The Johor State PERHILITAN Department is very concerned, and we will ensure that follow-up action is taken.

The Honourable Pasir Raja raised matters concerning wildlife disturbance such as wild boar, elephants and monkeys. Indeed, all three of these wildlife species recorded the highest disturbances received by the Johor State PERHILITAN. However, throughout 2019, only 12 complaints related to monkey conflicts and no complaints related to elephant conflicts were received by the department in the Pasir Raja area. Meanwhile, from September to November 2020, only 6 monkey disturbance complaints were received. Accordingly, the PERHILITAN Department, with efforts, is trying to resolve and reduce the monkey population in the Pasir Raja State Constituency area through the following actions: carrying out investigations and monitoring for each complaint, installing traps and disposing of the monkeys that are caught, taking action by shooting the monkeys dead if trapping efforts are not effective or the disturbance involves attacks on humans, and also providing advisory services and discussions with the local community.

Before I conclude, Mr Speaker, many of the Honourable Members have asked about the Johor Healthy Card (Kad Sihat Johor). I would like to share that the Johor Healthy Card Programme continues for 2021. For the information of all Honourable Members in this august House, the implementation of the Johor Healthy Card is, in principle, aimed at helping the B40 group, the B40 in the state of Johor. In 2018, the recipients of the Johor Healthy Card in the first phase were targeted at e-Kasih groups in each district of the state of Johor, namely a maximum of 4,000 recipients for whom an allocation was made, allocating a total of RM1.2 million.

In 2020, recipients of the Johor Healthy Card in this second phase were targeted at 47,600 recipients with an allocation of RM2 million. Apart from that, holders of the Johor Healthy Card are entitled to receive health and medical treatment at hospitals and private clinics at 287 panel clinics. In addition, the Johor Healthy Card offered is valued at RM500.00 a year for a family and RM350.00 for each individual, with a usage limit of RM50.00 for each treatment.

Based on the statistics on the use of the Johor Healthy Card in 2020, the total number of Healthy Card recipients was 24,400 recipients, which is only around 51.26% compared with the overall recipient quota allocated, namely 47,600 recipients. This is because most of the quotas in each state constituency could not be fulfilled, which resulted in the impact of the 2020 Johor Healthy Card being less visible. The state government is currently studying more productive and effective mechanisms for the implementation of the Johor Healthy Card for 2021. If more productive and effective mechanisms can be identified, the government will announce them so that Healthy Card holders can enjoy the benefits on a continuous basis in the future, and we will also inform all Honourable Members. The quota of Johor Healthy Card recipients for 2021 is 47,000, as I said earlier.

Mr Speaker, as the EXCO responsible for Indian community affairs in the state of Johor, I would like to extend my millions of thanks to the Honourable Menteri Besar for announcing, through the Budget Speech, an increase in allocation for the Indian community to RM4 million for 2021.

In answer to the questions from YB Bekok and YB Tiram, the Sultanah Rogayah Foundation will examine all applications and ensure that each application receives attention, including those from temples and Tamil schools.

Mr Speaker, in conclusion of the speech, answers and proposals that I have put forward, these will to some extent provide clarification to the sitting of the House on the questions and matters raised by the Honourable Members.

Finally, as EXCO for Health and Environment, I am very proud of the departments and teams under my portfolio who, in the midst of the COVID-19 pandemic whose end is unknown, have worked hard without tiring, struggling to ensure our quality of life and our safety are protected. I appreciate their sacrifices. I also take this opportunity to extend my millions of thanks to all the heads of departments, both at state level and at federal level, for always giving cooperation in all aspects to ensure we provide the best service to the public.

To all Honourable Members who have touched on matters under my portfolio, I have tried my best to give answers to all the issues raised. However, if there are matters that have been overlooked, follow-up action will be taken by my heads of department. May all that is knotted be untangled, all that is murky be clarified, and all that is lacking be added to. That is all, thank you.

SpeakerEN

Thank you, Honourable Chairman of the Health and Environment Committee. Next, I invite the Honourable Chairman of the Investment, Entrepreneur Development, Cooperatives and Human Resources Committee to come forward, please.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Thank you, Mr Speaker. Bismillahirahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace and Salam Makmur Johor. Mr Speaker, fellow Honourable Members from the government side as well as the opposition bench, and all the Members of this House whom I respect, cherish and hold in high regard.

First, I wish to offer my respectful thanks and sincere congratulations to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang DiPertuan Bagi Negeri dan Jajahan Takluk Johor Darul Ta'zim, on the occasion of His Royal Highness's birthday celebration on 22 November 2020. May His Royal Highness be blessed with health, strength and grace, so that He may continue to reign on the throne with great dignity, sovereignty and well-being.

Mr Speaker, we meet once again in this closing session for the Johor State Investment, Entrepreneur Development, Cooperatives and Human Resources Committee. I wish to record my heartfelt thanks to the Honourable Members who took part in the question-and-answer session as well as the debate sessions, for providing input, views, recommendations and sound ideas, and not forgetting the criticisms which can be taken into consideration and implemented by the government for the good of the state and the people of Johor in particular.

Here, allow me to share a verse from the holy Quran (recitation of Surah Al-Maidah, Verse 2). The passage from Surah Al-Maidah verse 2. The translation of the verse means, "And cooperate in righteousness and piety, but do not cooperate in sin and aggression. And fear Allah; indeed, Allah is severe in penalty." My heartfelt congratulations to all Honourable Members for succeeding in creating a harmonious sitting, with good manners and language observed while conducting themselves in this esteemed House. I look ahead, hoping that this practice can be continued and maintained in the sittings to come. Before I continue with my winding-up speech, allow me to offer a pantun for the entertainment and guidance of all Honourable Members and guests in this esteemed House.

Stopping at Benut to buy berangan, Delicious when eaten one by one. Differing ideologies are no obstacle, For the people, let us unite as one.

Mr Speaker, during the Third Budget Meeting 2020, for the Third Session of the 14th Johor State Legislative Assembly, I have paid serious attention to and examined the issues raised during the debate on the Rang Undang-Undang Enakmen Perbekalan 2021 tahun 2020. There were many important matters which became the government's main focus in adapting to the current situation and in tackling the onslaught of the COVID-19 pandemic. In the week of debate that has taken place, it is clear that there are several issues which received the attention of Honourable Members. No fewer than 40 Honourable Members took part in debating issues related to the Johor Budget 2021, and in general the issues raised revolved around the measures and efforts of the government in safeguarding the welfare and well-being of the people. Also the government's efforts in improving the cash flow of income and the state economy, particularly the investment sector, and also the government's efforts in the entrepreneur and cooperative development sector, and finally the government's efforts in adding value to the human capital development of this state so that issues relating to unemployment and wasteful use of the workforce can be overcome and addressed.

Mr Speaker, the Johor State Government under the leadership of the Honourable Menteri Besar, Datuk Haji Hasni Mohammad, is very sensitive and concerned about the welfare of the people facing difficulties, and always strives diligently to help ease their burdens and to resolve the problems that arise. We understand the current situation, especially in facing and adapting to the new normal following the COVID-19 pandemic. Many parties and individuals have been directly affected. Many need assistance or support in efforts to restore their livelihood and continue their lives, which have been disrupted. I am confident that all Honourable Members agree that the people now need money, knowledge and also skills in order to continue living and survive. Resist, and persevere in facing the challenges of life within the new normal. Accordingly, I will structure my winding-up speech into three parts or three categories based on the portfolios under my responsibility which are now of concern and a hot topic at this time, namely the investment sector, the entrepreneur development sector, business and cooperatives, and finally the human capital development sector.

I will try to answer all the questions and matters arising relating to the three sectors mentioned earlier, since they fall under my responsibility and my jurisdiction. And, God willing, I will conclude my winding-up speech by commenting on the conclusion of the Johor State Budget Supply allocation for the Year 2021.

Mr Speaker, as all Honourable Members are already aware, the Johor Budget 2021 was indeed expected to be a deficit budget following the current situation of the world economy, which is facing and struggling with extraordinary circumstances due to the spread of the COVID-19 pandemic. The projected deficit budget of RM248 million is due to the imbalance whereby state revenue from taxes and other sources is far lower than the high expenditure costs which the government has had to allocate in order to safeguard the welfare and needs of the people, as well as to restore socio-economic development in this state.

The Honourable Menteri Besar has tabled the 2021 Budget, which we see as very realistic and holistic in driving the state of Johor through the challenges ahead, particularly in the post-COVID-19 period. A total of 12 agendas that are the main focus, comprising Johor Tani, Johor Digital, Johor Niaga, Modal Insan Johor, Governance Johor, Majestic Johor, Masyarakat Johor, Orang Muda Johor, Johor Madani, Johor Prihatin and Johor Berkebajikan, have been outlined for implementation next year, and these are guided by three main objectives, namely:

1. Ensuring the resilience and continuity of the economy 2. Empowering and strengthening the welfare of the people of Johor 3. Ensuring the well-being and prosperity of the people of the state of Johor

I am confident that the wise Honourable Members have all studied in depth and are well versed in all the contents of the budget. Mr Speaker, the Johor State Government led by the Honourable Menteri Besar has never known the meaning of tiring in seeking solutions to all the crises that have arisen, and in driving the state economy back onto its original and brighter path. The government has taken a serious approach regarding the economic and workforce issues severely affected by the closure of international borders following the spread of the COVID-19 pandemic. As was raised by the Honourable Member for Mengkibol, the Honourable Member for Panti, the Honourable Member for Kukup, the Honourable Member for Stulang, the Honourable Member for Tenggaroh and the Honourable Member for Bukit Batu in the earlier debate session, the investment sector was not spared from receiving the direct adverse impact of the COVID-19 pandemic.

I do not deny that some Honourable Members have questioned and even disputed the status of achievement or the current value of the investment sector. It would be unfair to me if the dispute and comparison were made based on two different situations and conditions, namely a time range or year without the threat of COVID-19, 2019, compared with the current year range, the factors are different. I also do not wish to use the excuse that COVID-19 is the main factor in the decline of investment rates this year. And we will always adopt an optimistic attitude in efforts to attract investors and increase the investment value of the state of Johor. This can be demonstrated by the success in bringing in investment value of RM5.7 billion, in addition to the RM45 billion investment value currently being pursued.

Mr Speaker, regarding the concerns of the Honourable Member for Bukit Batu about the strategy and direction of this state's investment sector. The concerns of the Honourable Member for Bukit Batu will be resolved and answered when the Johor State Investment Master Plan 2030 is launched next year. This is because all the information and data relating to what the Honourable Member needs will be contained and clearly explained in that plan. Quoting the statement of the Honourable Member for Mengkibol regarding the proposal for the government to provide incentives to attract new investment, it is already within the government's plans, where the state government, in an effort, is considering the provision of incentives in the form of rent rebate facilities, free office space, to chambers or business and foreign investment councils to start their operations in this state. It is seen as able to attract investors to this state because it has facilities for management purposes. However, this initiative is still at the study stage.

Mr Speaker, turning to the entrepreneurship sector, many Honourable Members have taken part and raised several issues or matters relating to the plight of entrepreneurs, especially micro-entrepreneurs and SMEs who have been severely affected and nearly paralysed following the implementation of the PKP, PKBB and PKPB orders to curb the spread of the COVID-19 pandemic. It cannot be denied that some entrepreneurs have had to close shop because they are no longer able to continue business operations due to suffering very high and continuous losses. This state government is very sensitive and concerned about the issues that have been shared by the Honourable Member for Kota Iskandar, the Honourable Member for Machap, the Honourable Member for Endau and the Honourable Member for Tanjung Surat, the Honourable Member for Parit Raja, the Honourable Member for Sedili, the Honourable Member for Penawar and the Honourable Member for Paloh.

Accordingly, the state government has already announced the implementation of various initiatives and also allocations to assist these affected entrepreneurs. Among the programmes is the Geran Orang Lokal 3.0, where previously the allocation for implementing the programme was RM1.5 million. The state government under the leadership of the Honourable Menteri Besar has been pleased to add an allocation of RM1.5 million, bringing the total allocation to RM3 million in 2021.

Mr Speaker, turning to the Honourable Member for Endau, the Honourable Member for Tanjung Surat and Parit Raja, who put forward the proposal for the government to extend the period of exemption from business licence fees, as well as to reinstate the exemption of stall fees for traders at farmers' markets, night markets and morning markets in all local authority (PBT) areas, which ended in October 2020. I am pleased to inform and quote the speech of the Honourable Menteri Besar in tabling the 2021 Budget: the state government has agreed to realise what has been proposed by the Honourable Members.

Mr Speaker, turning to the human capital sector, I was very interested in the excerpt of the speech of the Honourable Member for Parit Yaani, who stated that there is an allocation from the Johor state government that has not been spent at all, namely the human capital allocation involving RM3 million. Here I humbly apologise for refuting and correcting that claim. For the information of the Honourable Member for Parit Yaani, the state government agency responsible for human resource or human capital development in this state, namely the SMI Unit, has successfully implemented various initiatives or programmes aimed at improving skills and also job placement for individuals who have been retrenched and also for the unemployed.

The RM3 million allocation has indeed been used for that purpose. Here I share some of the initiatives that have been implemented using that allocation. The Johor Work Week programme, which was held simultaneously at 3 locations, namely in Muar, the northern zone, Kluang, in the central zone, and the Johor Bahru district, the southern zone. The implementation of this initiative involved an allocation of RM100,000.00. Second, the up-skilling and re-skilling programme, which offers 16 skills training courses and is being actively implemented, involving an allocation of RM2 million, and finally the third, the Insan Johor programme. The programme, which involved an allocation of RM1 million, has benefited 400 trainees.

Mr Speaker, I am very honoured and proud of the leadership of the Honourable Menteri Besar, who is always ready to open-mindedly listen to ideas, views and criticism from friends on the opposition bench despite differences in political ideology. The Honourable Menteri Besar has shown the professional attitude of a leader who respects the democratic system by recognising the position of the opposition in the Johor State Assembly. This has been demonstrated through the increase in the allocation for Opposition ADUNs from RM50,000.00 to RM150,000.00, in addition to the proposal to raise the allowance of the Opposition Leader from RM3,000.00 to RM5,000.00. My congratulations to the Honourable Menteri Besar for taking wise steps which have also received appreciation as stated in the debate speeches of the Honourable Member for Parit Yaani, the Honourable Member for Bukit Kepong, Tangkak, Paloh, Bekok, Pengerang, and not forgetting the Honourable Member for Skudai.

Mr Speaker, referring to the debate speeches of the Honourable Member for Parit Yaani, the Honourable Member for Machap, Yong Peng, Johor Jaya, Tiram, Pulai Sebatang and also Pasir Raja, it cannot be denied that the frontliners, the front liners, who are always on standby to face and tackle the onslaught of the COVID-19 pandemic must be held in high regard and given respect. Their sacrifice in facing the risk of infection which brings danger or even death in carrying out their responsibilities in daily duties deserves praise and respect. Accordingly, on this occasion I wish to express my appreciation to these heroes by warmly welcoming and greatly welcoming the provision of cash incentives to around 30,000 frontliners by the Johor state government.

Mr Speaker, I also wish to request the Honourable Menteri Besar that, if it can be considered, my proposal that this assistance incentive be extended to media practitioners in this state be taken into account. For the information of Honourable Members, media practitioners in this state are among the individuals severely affected economically following the PKP and PKPB orders, with low basic salaries. The majority of them depend on additional income obtained through news material allowance payments that are provided and published. Besides that, they also face the risk of infection because they have to go into the field in an effort to gather information to share with the general public. Looking at the sacrifice and contribution of these people, they deserve recognition and reward.

Mr Speaker, I also welcome the suggestion of the Honourable Member for Parit Yaani and the Honourable Member for Senggarang, Kempas, who proposed that the salaries of several parties be cut, especially the top leadership such as the Honourable Menteri Besar and the EXCO, for the purpose of the COVID-19 Special Fund. This measure indirectly allows us to show the concern and sacrifice of the leaders or Representatives of the People in this state in an effort to help and ease the burdens of the well-being of the Johor nation.

Mr Speaker, before I conclude my winding-up speech, allow me to record my sincere thanks to the Honourable Menteri Besar of Johor, Datuk Haji Hasni Mohammad, the team of state executive officers comprising the Honourable Dato' State Secretary and staff, the Honourable Dato' State Treasury and staff, and also the body, UPENJ, for their tireless efforts in preparing the 2021 Budget, which carries the theme "Resilience for Prosperity". Therefore, I call upon all my fellow Honourable Members to join hands in answering the call of the Honourable Menteri Besar to show solidarity for the sake of Johor and to prove our loyalty to the beloved state of Johor.

Finally, please accept a pantun from me as a closing remark. There are no words as beautiful as language, wishing to express my feelings, the onslaught of COVID-19 is felt by all, I support the 2021 Budget being passed. Wabillahitaufik walhidayah wassalamualaikum warahmatullahi wabarakatuh. Thank you.

SpeakerEN

Thank you, Honourable Chairman of the Investment, Entrepreneur Development, Cooperatives and Human Resources Committee. Next, I invite the Honourable Chairman of the Tourism, Youth and Sports Committee to come forward, please.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace and prosperity to Johor. Thank you, Mr Speaker, for giving me the opportunity to wind up today. First, I humbly express my gratitude and record my highest congratulations to His Majesty the Sultan of Johor, Sultan Ibrahim Ibni Almarhum Sultan Iskandar, on the occasion of the celebration of His Majesty's birthday on 22 November 2020 that has just passed. I also take this opportunity to convey my deepest gratitude to His Majesty the Sultan of Johor, who has commanded His Royal Highness the Crown Prince of Johor, Tunku Ismail Ibni Sultan Ibrahim, to head and lead all matters and activities involving the youth of this state of Johor. Alhamdulillah, this is an honour for every young person in the state of Johor.

Mr Speaker, as the Member of the State Assembly for Layang-Layang (DUN Layang-Layang), I also take this opportunity to extend my congratulations and thanks to the Honourable Menteri Besar, Datuk Haji Hasni bin Mohamad, for the tabling of the State Budget, which is very inclusive, comprehensive, and truly attuned to the hearts and natural voice of the people of Johor. Layang-Layang is confident and believes that the efforts of this state government are capable of helping to revive the economy and easing the burden and hardship of the people of Johor who have been affected, directly or indirectly, by the COVID-19 pandemic. The Johor Budget 2021, with the theme 'Berdaya Tahan Demi Kemakmuran', witnesses various special initiatives and incentives allocated to OMJ or Orang Muda Johor (Johor Youth) and the tourism sector. A total of RM57.3 million has been allocated for Orang Muda Johor, while RM14 million has been allocated for the tourism sector. Alhamdulillah, with cupped hands and a winnowing basket, I raise them in gratitude. Allah SWT reminds us to always be grateful, as in Surah Ibrahim, verse 7, "dan ingatkanlah ketika Tuhanmu memperingatkan sesungguhnya jika kamu bersyukur, nescaya aku akan menambah nikmat kepadamu, tetapi jika kami kufur nikmat maka sesungguhnya azabku sangat pedih".

Mr Speaker, many matters have been raised by Honourable Members throughout this debating session, whether in the form of sound proposals, support, questions or criticism. Thank you, Honourable Kempas, Sri Medan, Mahkota, Semerah, Mengkibol, Penawar, Johor Jaya, Johor Lama, Parit Raja, Pasir Raja, Panti, Tenggaroh, Buluh Kasap, Stulang, Semerah and Yong Peng, who have touched on matters related to my portfolio, namely tourism, youth and sports. I appreciate every proposal and every constructive criticism that has been put forward to ensure that the state government can serve more quickly and effectively in resolving the problems of the people and in shaping the future of the people of Johor.

Never sling indecent insults, challenge and provoke to seek out enemies; within, quarrel; without, brawl, the people suffer and the state crumbles.

Never give in to lust, scrambling for power, hammering one another; greedy for wealth, forgetting shame, the state ruined, heaped with strife.

Mr Speaker, throughout five days of debate, the tourism sector has been given very significant emphasis. Surely this is no surprise, because tourism is among the sectors most severely affected by the COVID-19 pandemic.

However, what is more important is the fact that the emphasis placed in this august House is nothing other than a reflection of how much Honourable Members understand the challenges and hardships faced by players in the tourism industry...

Speaker, Standing Order 45 (v), thank you.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Mr Speaker, I am answering a question. Honourable Penawar, please don't disturb, can you?

SpeakerEN

45(v), which one is it, Honourable Member, which 45?

This is chaotic. You can't lift that paper. (House laughs).

SpeakerEN

Young Honourable Member. Continue, Honourable Member.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Thank you, wise Mr Speaker. Please don't give him the mic again, Mr Speaker. (House laughs).

SpeakerEN

That is his right, Honourable Member. Please, please continue.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

What is more important is the fact that the emphasis placed in this House reflects how much all Honourable Members are concerned about what has happened, and that is why they have raised how important it is for the Johor–Singapore border to be reopened. Believe me, under the leadership of the Honourable Menteri Besar, Datuk Hasni Mohammad, the state government will continue to strive to reopen the state's border as soon as possible, taking into account the proposals of Honourable Members and bringing them to the state government's discussion sessions with Putrajaya and the Singapore government.

Mr Speaker, in the budget announced by the Honourable Menteri Besar, Majestic Johor has been elevated into a very important agenda for the state of Johor. The idea of Majestic Johor did not arise by accident; it was chosen because of the word Majestic itself. Very Johor. It truly symbolises the state of Johor. A word used only to manifest something very beautiful and awe-inspiring, and that is Johor, a beautiful and charming state rich in various attractions. Subhanallah, all praise to Allah SWT who has bestowed upon the state of Johor so much beauty and such extraordinary natural wonders. Just imagine, Johor alone has 18 mountains: five in the north, five in the west, five in the south and three in the east. There are 6 national parks, and there are a total of 131 islands in this Darul Ta'zim, most of them located in Mersing.

Mr Speaker, the islands of Mersing are surrounded by a truly captivating panorama; the sand is white and clean, the sea water is greenish-blue, and the seabed is very clear. That is why many say, as Honourable Tenggaroh put it, "The Maldives of Malaysia", with permission. Various activities can be carried out such as snorkeling, diving and island hopping. I believe Honourable Johor Jaya, former EXCO for Tourism who is also a diver, can verify what I am saying.

However, not many Malaysians visit the islands in the Mersing district; most of them use the jetty in the town of Mersing to go to Pulau Tioman, Pahang. Just imagine...

Tuan Tan Hong PengDAP · PHSkudai

Peraturan...

SpeakerEN

Yes, Skudai, just a moment.

Tuan Tan Hong PengDAP · PHSkudaiEN

Mr Speaker, the issue raised by Penawar just now...

SpeakerEN

Standing Order, which Standing Order, Honourable Member?

Tuan Tan Hong PengDAP · PHSkudaiEN

Standing Order 45 (v): a Member may not read out his speech, but he may read out extracts from written papers. Just now I saw the Honourable EXCO reading, following along, he's not reading extracts. So, but, the Mr Speaker's ruling just now said it is his right. But this is a Standing Order issue, so I hope...

SpeakerEN

That is not the EXCO's right, it is Penawar's right just now, Honourable Member.

Tuan Tan Hong PengDAP · PHSkudaiEN

No, no, what he means is, reading should not be done by lifting it up like this, it's not proper. Because yesterday Perling was also reprimanded for lifting it up. I hope this matter can, this can be...

Mr Speaker, Standing Order 45 (ii): it may not be interrupted; it may not be interrupted unless it contravenes the Standing Orders. Mr Speaker already informed us just now.

Tuan Tan Chen ChoonDAP · PHJementahEN

He did not interrupt, he, he.... Honourable Skudai said Standing Orders, he did not interrupt...

SpeakerEN

Wait, wait. Let Sri Medan go first.

Let Sri Medan go first, one at a time.

SpeakerEN

Let Sri Medan speak first.

Tuan Tan Chen ChoonDAP · PHJementahEN

He did not interrupt at all.

Just a moment, Honourable Member, one at a time. Mr Speaker just informed us of Standing Order 45 No. (v): one may not read out his speech, but he may read out extracts. I assume that what he's reading are just extracts, actually. There is nothing wrong at all, I think. I think everyone is using the same thing, Mr Speaker. So Standing Order 45 (ii), please don't interrupt. It may not be interrupted unless it contravenes the Standing Orders. Thank you, Mr Speaker.

SpeakerEN

Yes, he also has the right to interrupt because, in Skudai's view just now, it contravenes the Standing Orders. So, I advise the EXCO not to keep reading continuously, follow Standing Order 45 (v) just now. Raise it up, raise its place so that checking is easier. Please continue.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Thank you, Mr Speaker. That's it, Honourable Penawar. (House laughs). I myself no longer know where I am, Mr Speaker. (House laughs).

Mr Speaker, this is exactly what I want to point out: Standing Order 45 No. (xiii) (d), provocative and insulting remarks that disturb a person's dignity, because there may be a threat; I am rather frightened, thank you.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Threat (House laughs).

SpeakerEN

This is truly checks and balances.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Exactly. I don't know which is the government and which is the opposition, Honourable Member.

Speaker

Jemput, jemput.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Mr Speaker, however, not many Malaysians visit the islands in the Mersing district...

SpeakerEN

Ok, looks smart, Honourable Member, looks smart.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Mr Speaker, most use the jetty in the town of Mersing to go to Pulau Tioman, Pahang. Just imagine, tourists are using the infrastructure we built for the convenience and comfort of tourists to go to another state. Many Malaysians still do not know about the beauty of the Mersing archipelago.

Mr Speaker, apart from the Mersing islands, another island that also has very considerable ecotourism potential is Pulau Kukup. A total of RM6 million has been spent to develop this tourism island, which is full of mangrove swamps. With an area of 647 hectares, Pulau Kukup is among the largest uninhabited islands in the world. This island has been recognised as a wetland of international importance by the Geneva Convention Bureau. Pulau Kukup has 27 native mangrove species, 111 fish species and 23 bird species. Not only that, Pulau Kukup also presents the atmosphere of a fishing village; its kelong is a breeding ground for marine life, and birds fly about in the mangrove areas.

Honourable Members, if you visit, you will surely be captivated. However, just like the Mersing islands, not many Malaysians and Johoreans know about the facts of the beauty of Pulau Kukup. There is a reason I am sharing all this: if you don't know, you cannot love. Honourable Members of this House whom I respect, we have already sat for 6 days in this magnificently built House. This House is also known as the gem of Kota Iskandar. The building and this honourable House are the only administrative building in Malaysia that allows tourists to come and visit. The development philosophy of Kota Iskandar faces the qibla axis, combining the architecture of the Ottoman Islamic government, whose capital was Alhambra in Spain, and also the Sultan Ibrahim Building, Johor Bahru. This House is also special for its architecture, which tells of Johor, and the Quran placed up there as wisdom and guidance for all EXCOs who are in this House. The blue chairs symbolise the royal colour, the U-shape seating symbolises the modern style of governance as in Westminster, the pewter decorations, gambier, black pepper, and the pineapple-shaped roof are all synonymous with Johor. Indeed, if Honourable Members stand and speak in the middle of this House, there will be a unique echo; there is no such place in any other House, yes, but Honourable Member, don't let Penawar, because he will say all sorts of nonsense later, Mr Speaker.

Mr Speaker…

SpeakerEN

Don't bring out new Standing Orders later.

Mr Speaker, I, Mr Speaker, Mr Speaker...

SpeakerEN

Which Standing Order, Honourable Member?

Standing Order 45 (xiii) (a): casting unfavourable insinuations upon another Member. Thank you, Mr Speaker. (House laughs).

SpeakerEN

Even if the Honourable Member has a problem with Penawar, that problem cannot be expressed, Honourable Member. (House laughs).

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Alright, Mr Speaker, I will try to withdraw. Just like the Mersing and Kukup islands, Honourable Member, not many Johoreans know, about, Johoreans know about the facts of this honourable House. Mr Speaker, the lack of effective and strategic promotion or publicity is among the reasons why Johor's tourism products are less visited. Based on the report of Tourism Malaysia, Johor's tourism ranking dropped from third place in 2016 and 2018 to seventh place last year. Therefore, Tourism Johor is now focusing on promotion and marketing. The first phase will focus more on domestic tourism, and the second phase will focus on international tourists. Tourism Johor is currently and will continue to promote all types of tourism products through various mediums such as Fam-trip with social media, Instagram, Facebook, Twitter, to the extent that we will broadcast the serial programme Travelog that promotes, promoted by well-known national celebrities; for example, well-known celebrity Elizabeth Tan is the guest artiste for the Mersing district. At first glance, he looks like Honourable Penawar.

SpeakerEN

That's no problem, that one.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Itu pujian ya. Tapi artis yang pergi membuat promosi di Desaru ialah Alif Satar Yang Berhormat, bukan main lagi Penawar berlari dengan Alif Satar di pantai Desaru macam model Baywatch. Mr Speaker, program bersiri Travelog ini bertajuk Majestic Johor, dia bakal mempamerkan produk-produk pelancongan dan insya-Allah akan ditayangkan di Astro Ria pada 11 Disember tahun ini. Antara daerah-daerah yang terlibat termasuklah Muar, Johor Bahru, Iskandar Puteri, Kluang, Tangkak, Batu Pahat, Pontian, Kulai, Kota Tinggi dan juga Desaru.

Mr Speaker, untuk fasa kedua pembikinan video artikel-artikel tentang produk-produk pelancongan Johor akan dibangunkan dalam pelbagai bahasa seperti Mandarin, Jepun, Korean dan juga Arabic. Tujuannya supaya kita dapat mengetengahkan dan mempromosikan produk-produk pelancongan Johor ke China, Jepun, Korea dan juga Timur Tengah dengan lebih agresif. Saya juga ingin merayu kepada semua Ahli-Ahli Yang Berhormat di dalam Dewan yang mulia ini untuk sama-sama membantu mempromosikan produk-produk pelancongan supaya rating Johor diletakkan di tempat yang sepatutnya.

Mr Speaker, Johor Tourism Interchange atau JTI dengan peruntukan RM500,000.00 pula akan dibangunkan bagi mentransformasikan ekonomi digital pelancongan. JTI akan menghubungkan semua pemilik produk, operator pelancongan serta penggiat industri dalam satu Digital Market Place. Ini akan memudahkan kita menjual produk-produk pelancongan ke seluruh dunia. Selain itu, galakan daripada Ministry of Tourism memperuntukkan sebanyak RM200 juta melalui Tourism Malaysia. Kerajaan

negeri melalui Tourism Johor akan bekerjasama rapat dengan MOTAC negeri dan Tourism Malaysia Wilayah Selatan dalam memastikan negeri Johor menerima insentif tersebut dengan jumlah yang paling maksima.

Mr Speaker, antara inisiatif lain di bawah agenda Majestic Johor adalah untuk meneliti semula Pelan Pelancongan Negeri Johor 2014-2023. Tujuan penelitian semula adalah bagi memastikan hala tuju sektor pelancongan dapat dirancang dengan lebih tersusun dan mengikut trend semasa. Saya menyambut baik semua cadangan daripada Honourable Semerah, Honourable Yong Peng, Pulai Sebatang, Panti, Serom, Sedili, Kukup termasuklah Penawar. Pelan Pelancongan negeri khusus untuk Cultural dan Heritage, Food Tourism, Sport Tourism, Medical Tourism, Edu Tourism dan Eco Tourism, semuanya akan diperhalusi kembali bagi dan mengambil kira cadangan-cadangan Ahli-Ahli Yang Berhormat.

Menjawab soalan Honourable Johor Jaya dan Stulang, untuk keselesaan pengunjung dan pelancong sebanyak RM20 juta telah diperuntukkan untuk kerja-kerja menaik taraf prasarana dan infrastruktur Kompleks Sultan Abu Bakar dan Bangunan Sultan Iskandar Johor Bahru atau lebih dikenali sebagai CIQ JB. Kerja-kerja sudah berjalan dan dijangka siap seawal tahun hadapan.

Mr Speaker, merujuk kepada Honourable Tenggaroh semalam, pihak kerajaan negeri juga menyambut baik akan cadangan untuk incorporatized Tourism Johor. Untuk makluman Tourism Johor kini di peringkat perbincangan dan perincian maklumat berkaitan penubuhan Tourism Johor Incorporated(TJI) untuk pertimbangan kerajaan negeri. Penubuhan TJI ini bertujuan untuk memperkasakan dan mendaya upayakan Tourism Johor. Usaha ini juga dilihat dapat membantu pejabat JETCO di Singapura. Tindakan sebegini juga akan membuka ruang dan peluang yang lebih meluas untuk Tourism Johor memacu sektor pelancongan negeri Johor terutamanya dalam menarik pakar-pakar pelancongan untuk berkhidmat dalam industri negeri ini.

Mr Speaker, saya beralih kepada Agenda OMJ, Orang Muda Johor. Saya juga ingin mengucapkan terima kasih kepada Yang Amat Berhormat Datuk Haji Hasni Mohammad atas kesudian beliau untuk mendengar dan menerima cadangan anak-anak muda dalam menyediakan belanjawan tahun ini. Yang Amat Berhormat Menteri Besar yang telah memperuntukkan RM57 juta khas untuk orang muda Johor dalam 5 teras utama. Lebih 42 titik sentuhan yang akan memanfaatkan 1.6 juta rakyat Johor belia. Orang muda Johor sangat bertuah kerana mempunyai seorang Menteri Besar yang memahami, prihatin dan berjiwa muda sama seperti Honourable Penawar cuma dia, nafsu dia, pun macam orang muda.(Dewan ketawa). Bantuan dan undangan, undangan orang muda kepada Yang Amat Berhormat tidak pernah ditolak tidak kira dari platform Southern Volunteers, Dewan Muda Johor, Mahasiswa hinggalah ke Persatuan Tinju. Cadangan dan pandangan kepimpinan pemuda dan puteri, Majlis Belia Negeri Johor, Dewan Muda Johor dan Majlis Belia FELDA Johor diperhalusi satu persatu menunjukkan keprihatinan dan ketelitian beliau terhadap masa depan orang muda di Johor.

Mr Speaker, kerajaan negeri menyambut baik titah Duli Yang Amat Mulia Tunku Mahkota Johor untuk mewujudkan Tunku Mahkota Ismail Youth Center(TMIYC) di setiap daerah. TMIYC Johor Bahru akan disempurnakan pembukaannya oleh Duli Yang Amat Mulia Tunku Mahkota Johor pada pertengahan bulan ini insya-Allah. Manakala majlis pecah tanah di daerah Muar akan disempurnakan pada akhir tahun ini. TMIYC berperanan menjadi pusat pembangunan belia, keusahawanan, pusat aktiviti sini, sukan dan rekreasi serta program bermanfaat mengikut keperluan belia di setiap daerah.

Seterusnya, Mr Speaker, kerajaan negeri juga merancang untuk membangun Gym Rakyat yang bertujuan melahirkan rakyat Johor yang mementingkan gaya hidup sihat

dengan memelihara kesihatan fizikal dan mental dalam aktiviti harian. Seterusnya, Southern Volunteers juga diwujudkan untuk mengkoordinasi dan menggalakkan lagi penyertaan para belia dalam aktiviti kemasyarakatan dan khidmat bakti kepada bangsa Johor. Pada pagi ini, alhamdulillah suka saya melaporkan flag off misi penghantaran Bakul Makanan Southern Volunteers bagi rakyat Johor dan Malaysia yang terkandas di Singapura telah dilancarkan oleh Yang Amat Berhormat Menteri Besar. Untuk fasa pertama 1,000 bakul makanan akan dihantar untuk rakyat Malaysia yang terkandas di Singapura, yang berada di Singapura, maaf. Usaha ini dilakukan bersama-sama Malaysian High Commission in Singapore, Majlis Singapore Association, PAJ dan KPJ.

Mr Speaker, kerajaan Johor juga beriltizam untuk melahirkan lebih ramai pemimpin-pemimpin muda yang mampu bersaing dengan mana-mana anak muda di negeri atau negara lain. Mampu berdiri sama tinggi dan duduk sama rendah dengan belia-belia di mana-mana negara maju. Kerajaan negeri melalui IKLAS atau sekarang dikenali sebagai Institut Dato' Onn dan Dewan Muda Johor akan mengukuhkan Program Pembangunan Kepimpinan dan Bina Sahsiah bagi mempertingkatkan kepimpinan belia sekali gus melahirkan putera puteri terbaik bangsa. Penubuhan Johor Youth Database juga akan menjadi pangkalan data maklumat bagi 16.6 juta belia negeri Johor. Segala maklumat yang diperolehi melalui pangkalan data ini dapat membantu dalam merancang, menggubal dasar-dasar untuk anak-anak muda negeri Johor. Saya juga berterima kasih atas pengumuman Dana Galakan Persatuan Belia Negeri Johor bagi melaksanakan pelbagai program meliputi aktiviti kesukarelawan khidmat bakti masyarakat, belia, sukan dan rekreasi.

Mr Speaker, apa yang juga menggembirakan orang muda Johor, terutamanya golongan mahasiswa adalah pemberian one-off sebanyak RM150.00 kepada 35,000 mahasiswa anak Johor daripada keluarga B40 yang melibatkan peruntukan RM5.2 juta. Bantuan ini diharap dapat meringankan beban kos sara hidup mahasiswa seperti menampung kos pembayaran Internet bagi pembelajaran kuliah secara online.

Mr Speaker, bagi sektor sukan pula kerajaan negeri menerusi MSNJ telah merancang hala tuju atlet SUKMA Johor untuk masa depan mereka yang lebih terjamin. Antaranya dengan memperkenalkan beberapa inisiatif yang saya bentangkan tempoh hari. Antaranya pemberian insentif untuk atlet SUKMA, biasiswa program pengajian luar kampus dengan kerjasama UiTM, pemberian biasiswa dan pinjaman YPJ kepada atlet, Program Perantis Iskandar dan Program Titanium X yang akan diteruskan.

Alhamdulillah, seperti yang telah diumumkan oleh Yang Amat Berhormat Menteri Besar dalam belanjawan baru-baru ini, kerajaan negeri dengan hasil usaha KPRJ dan MSNJ sudah merangka Johor Sports Master Plan 2030, with permission. Pelan induk ini akan memberikan hala tuju baharu kepada industri sukan negeri Johor. Bukan sahaja untuk gaya hidup dan pembangunan atlet semata-mata, tetapi menjadikan sukan sebagai sumber ekonomi baharu kepada kerajaan negeri Johor. Pelan ini juga akan menjadi pelan jangka panjang yang komprehensif untuk kemudahan sukan di negeri Johor dan meletakkan Johor di dalam peta dunia. Kita mahu jadikan Johor as a sports power house of South East Asia.

Mr Speaker, saya mengucapkan juga jutaan terima kasih kepada Yang Amat Berhormat yang memperluas program aktif Johor melalui penganjuran Sukan Makmur Johor. Sukan Makmur ini telah dibuat oleh Dato' Zul dahulu, masa dia jadi EXCO. Bagi merakyatkan sukan serta menggalakkan aktiviti sukan sebagai sebahagian gaya hidup rakyat negeri Johor yang akan dilaksanakan di kesemua 56 DUN.

SpeakerEN

Azan Honourable Member.

(Berhenti sebentar kerana memberi laluan azan).

SpeakerEN

Jemput, jemput. Silakan.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Mr Speaker, dari segi prasarana sukan pula, sukacita saya maklumkan bahawa kerajaan negeri bercadang untuk membina sebuah Pusat Sukan Tempur atau Johor Combat Sports Centre dengan peruntukan sebanyak RM4.5 juta. Pusat ini akan dilengkapi dengan fasiliti sukan seperti tinju, silat, judo, taekwondo dan lawan pedang di dalam satu tempat. Ini bertujuan untuk pembangunan atlet dan menjadikan sukan tempur sebagai salah satu sukan utama di negeri Johor. Selain itu, kerajaan negeri juga akan menyediakan peruntukan sebanyak RM1 juta bagi melengkapkan peralatan di pusat sukan berprestasi tinggi Nusa Duta, Johor Bahru.

Mr Speaker, akhir sekali seperti yang kita semua sedia maklum Honourable Members, kita semua sedia maklum, rakyat sedang susah. 80,000 rakyat Johor dijangka hilang pekerjaan akibat pandemik COVID-19. Di sektor pelancongan ribuan yang sudah diberhentikan kerja dan ribuan juga sudah dipotong pendapatan bulanan. Pemandu-pemandu teksi dan pemandu-pemandu pelancong merintih dan menangis mengadu nasib. Sedih dan sayu apabila mendengar permasalahan yang terpaksa mereka hadapi untuk menerusi kehidupan. Saya merayu kepada Ahli-Ahli Yang Berhormat dari pihak kerajaan dan juga pembangkang berhentilah sebentar sengketa antara kita. Kerana rakyat memerlukan segala tenaga dan kudrat kita untuk berkhidmat dan berbakti kepada mereka.

Terima kasih Yang Amat Berhormat Menteri Besar yang telah menambahkan peruntukan kepada kawan-kawan kita yang berada di sana. Seperti yang disebut oleh Honourable Paloh dan juga Bukit Batu, you are not the enemy of the state. Yang jauh kita dekatkan, yang dekat kita rapatkan, yang rapat kita eratkan. Mungkin kah ini hikmah ujian tahun 2020. Marilah kita sama-sama terus istiqamah dalam memastikan segala usaha yang kita lakukan sebagai wakil rakyat dapat membuahkan hasil demi bangsa Johor dan negeri yang kita cintai. Marilah kita berganding bahu dalam memastikan agenda perjuangan demi bangsa Johor sentiasa didahulukan dan sama-samalah kita cuba mencari titik persamaan agar kita dapat mengharungi masa yang getir ini bersama. Ini bukan sesuatu perkara yang mudah tetapi ia juga bukan mustahil untuk dilaksanakan. Allah SWT berfirman dalam surah al-Imran, ayat 103. (Bacaan ayat). Dan berpegang teguhlah kamu kepada tali Allah dan janganlah kamu bercerai berai dan ingatlah nikmat Allah kepada kamu ketika kamu bermusuh-musuhan lalu Allah menyatukan hati-hati kamu agar kamu menjadi saudara yang berkasih sayang. Sekian, wabillahi taufik walhidayah. Wassalamualaikum warahmatullahi wabarakatuh.

SpeakerEN

Terima kasih kepada Honourable Chairman of the Committee on Tourism, Youth and Sports. Honourable Members, I adjourn this sitting until 2.30 pm this afternoon. That is all.

The sitting was adjourned at 1.06 pm.

The sitting resumed at 2.30 pm.

Deputy Speaker presided over the sitting.

Deputy SpeakerEN

Honourable Members, the sitting is resumed. Honourable Chairman of the Committee on Women, Family and Community Development, you may proceed.

Puan Zaiton binti Haji IsmailUMNO · BNChairman of the Committee on Women's Development, Family and Community · Sungai BalangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings of peace, greetings of a prosperous Johor. Madam Speaker, first of all, I would like to thank you for the opportunity given to deliver the winding-up speech on behalf of the government in the Third Meeting of the First Session of the 14th Johor State Legislative Assembly.

Madam Speaker, first, your humble servant humbly offers the highest congratulations and best wishes to His Majesty Sultan Ibrahim ibni Almarhum Sultan Iskandar, Sultan and Ruler of the State and Dependencies of Johor Darul Ta'zim, on the occasion of the celebration of His Majesty's birthday on 22 November 2020, corresponding to 6 Rabiulakhir 1442 Hijrah.

Madam Speaker, praise be to God, in March last year I took the oath of allegiance to His Royal Highness the Sultan of Johor and the Johor State Government, and became one of the members of the Johor State Executive Council for the portfolio of Women, Family and Community Development. God willing, I will shoulder this responsibility with trust and integrity, so that the needs and interests of the people remain the main focus in carrying out the duties entrusted to me.

Next, I would like to extend my highest congratulations to the Most Honourable Menteri Besar, who has administered the Johor State Government with full dedication, together with the tabling of the Johor Budget 2021, which is very inclusive, sustainable and prosperous for all levels of Johor society. This budget is a state expenditure estimate whose benefits cannot be denied and whose advantages certainly cannot be rejected. Under the theme "Resilience for Prosperity", which encompasses 3 main objectives and 12 agendas, I personally very much hope that all parties, whether government or private agencies, from the highest leadership down to the village level, can implement all the initiatives of this budget successfully. Because I believe that a good policy, if it is not supported and implemented well, will not succeed. The state government's administration, through the leadership of the Most Honourable Menteri Besar, has always emphasised the concept of prosperity so that all the children of Johor receive the benefits and economic spillover in this southern land of gems.

I would also like to extend a thousand thanks to all Honourable Members who took part in debating the Johor Budget 2021 tabled by the Most Honourable Menteri Besar, which touched on matters relating to my portfolio, particularly in the areas of women, family and community development. Indeed, many matters were raised during this debate session. Whether in the form of questions, proposals, support, and not a few responses in the form of criticism. Whatever the form and variety of responses given, I have always been open-minded in assessing every question and giving attention to all appropriate proposals in order to ensure an economic plan that is equitable and balanced so that its objectives are achieved and can be realised.

Madam Speaker, Honourable Mahkota touched on the Johor Caring Agenda in the Johor Budget 2021 regarding the Programme to Find People in Need of Assistance, namely COMB. The state government, through the Social Welfare Department (JKM), is always caring towards the hardships faced by the people and is always moving to reach out to people in need through various methods. I also thank Honourable Mahkota for his concern for the welfare of the people, especially in the Haji Manan Flats area located in the town of Kluang. The JKM has also taken action on this matter, and up to now a total of 84 residents of the Haji Manan Flats have received financial assistance from JKM, such as child aid, elderly aid, aid for persons with disabilities who are unable to work, general aid and other aid according to their needs. The total amount of aid distributed is RM26,909.00.

Next, Honourable Bukit Naning debated concerns about the allocation to be channelled to non-governmental organisations in implementing this COMB Programme. I wish to explain in this honourable House that the COMB Programme only uses existing allocations from the federal government and does not involve a large amount for agencies or NGOs. The implementation of this programme is in cooperation with agencies under the Johor State Women, Family and Community Development portfolio such as JKM, YPKDT, the Department of Women's Development, KEMAS and LPPKN. However, I strongly encourage NGOs to also act as agents of the government in identifying communities in need of assistance so that they can be helped. If Honourable Bukit Naning has lists of names of those eligible to receive assistance, he may also send them directly to me so that we can make an assessment before aid is approved according to the stipulated conditions. I also welcome Honourable Members in this House to take part in this COMB Programme.

For the information of the Honourable Member as well, the COMB Programme is not solely for finding those who need monthly assistance. Those who seek opportunities for specific assistance to generate income. Skills upgrading courses are also a main focus of the COMB Programme. This is so that they get the right channel to enjoy the benefits and opportunities provided by the state government.

Madam Speaker, Honourable Jementah wished to obtain the total number of complaints regarding cases of violence against women and children during the period of the COVID-19 outbreak. The state government, through the Social Welfare Department, is aware of the statistics on domestic violence cases reported by the Talian Kasih from 18 March 2020 to 30 October 2020, which is the period of the MCO, amounting to 264 complaints. Meanwhile, the statistics of cases handled by the Johor State JKM amounted to 53 cases. It is informed that the difference between the complaints at Talian Kasih and the domestic violence cases handled by the Johor JKM is due to the fact that most cases handled by Talian Kasih involve seeking advisory services and initial complaints relating to household problems that do not require further action at the JKM level. Meanwhile, the cases at the Johor JKM are cases in which further action has been taken, requiring protection orders from the court as provided under the Domestic Violence Act 1994 and referrals for counselling sessions. The Johor JKM has implemented several measures to assist victims of domestic violence during the MCO period as provided under the Domestic Violence Act 1994, Act 521, which have been carried out by the JKM Protection Officers and counsellors in assisting victims of domestic violence.

First, providing advisory services to victims in 34 cases. Providing temporary protection orders to victims requiring immediate protection in 14 cases. Assisting victims in obtaining protection orders in court in 3 cases and providing counselling services to victims in 2 cases.

Madam Speaker, Honourable Bukit Naning has proposed that the government channel assistance to those affected by the COVID-19 pandemic even though they do not fall under the e-Kasih category. I would like to inform this honourable House that the Johor State Government has introduced a special initiative known as the Johor Charity Aid, administered by the Johor State Treasury. This initiative is established for those who have never received any assistance from the federal government or the state government. Moreover, the federal government has also allowed the i-Lestari and i-Sinar programmes which enable communities affected by COVID-19 to withdraw their EPF (KWSP) contributions to cover some of their living needs.

Madam Speaker, Honourable Penggaram has made a proposal to the state government to allocate a sum of budget to provide more effective and comprehensive counselling services to the community through existing agencies. I would like to share in this honourable House that the state government of Johor, through the Darul Ta'zim Family Development Foundation (YPKDT), has planned the Johor State Counsellor Professionalism Programme under the Johor State Budget 2021. This programme aims to gather and combine expert personnel from among counsellors in the state of Johor from various agencies in order to strengthen counselling services while addressing social problems. This programme also aims to promote free counselling services to all levels of society and thereby foster psychological well-being in terms of emotional, mental and behavioural stability among the people of the state of Johor. For 2021, YPKDT will also implement the Johor Sport Programme for Community (SPAC), a programme that aims to address social problems at the community level while building a sense of identity among youth.

Madam Speaker, Honourable Jementah wished to know what initiatives will be implemented by the state government for family development and women with an allocation of RM2.3 million as announced by the Most Honourable Menteri Besar during the tabling of the Johor Budget 2021. In fact, the programmes allocated with the value of RM2.3 million have already been stated one by one by the Most Honourable Menteri Besar in the Johor Budget 2021.

Therefore, I briefly share with the Honourable Member that the state government, through YPKDT under the 11th agenda, namely the Johor Caring Agenda, will implement 6 main programmes supported by side programmes such as:

1. Center of Suri Johor which functions as a training and skills centre for self-development and human capital of the target group. It is expected that a total of 700 entrepreneurs will benefit from this programme. Center of Suri Johor, with permission, will be strengthened by implementing various programmes including the Woman Income Generating Skill Project (WINGS), an equipment assistance scheme for businesses and a focused entrepreneur inspiration course.

2. Professional Women's Pesona. The purpose of introducing this initiative in 2021 is to support the national women's policy in efforts to integrate women in all sectors of national development in line with their capabilities and needs, for the purpose of improving the quality of life in their respective fields and recognising the role and contribution of women in the face of gender-based discrimination.

3. Development of Women and Family Data in the State of Johor. The development of this data is important to ensure that women and family data are continuously updated to facilitate the state government in identifying groups that need to be helped and empowered.

4. Family and Community Intervention Programme. This family and community intervention programme demonstrates the state government's concern in strengthening the family institutions of the Johor community. Among the programmes to be implemented are the Sakinah Family Icon Programme, the Harmonious Family Journey Programme, the Johor Support Programme for Community, the Harmonious Family Module Programme and the Johor State Sakinah Family Module.

5. Training and Promotion Programme, namely PLP. PLP is a development programme for persons with disabilities (OKU) which focuses on improving the skills of OKU groups to increase family income.

6. Awareness programme for families with children with disabilities, namely KOKU. This programme will be conducted in the form of road shows which aim to create awareness among communities with children with disabilities. Recognising the potential and opportunities of children with disabilities in helping families and communities.

Madam Speaker, Honourable Johor Jaya wished to know the status of the implementation of the Legal Aid Scheme under the management of YPKDT. For the information, the implementation of the Johor State Women's Legal Aid Scheme 2020 has been dropped after receiving views and comments from the Johor State Legal Adviser's Office and the decision of the 19th YPKDT Board of Directors Meeting in 2020. Among the comments of the Johor State Legal Adviser's Office refer to several related Acts as follows:

1. Section 2A of the Legal Aid Act 1971. 2. Section 12 Part 4 of the Legal Aid Act 1971. 3. Section 13 Part 4 of the Legal Aid Act 1971. 4. Section 15 Part 4 of the Legal Aid Act 1971. 5. Legal Aid Regulations 2017. 6. Section 2B of the Legal Aid Act 1971.

Therefore, based on the above legal provisions, matters relating to legal aid services to the general public, particularly those with an annual income of less than RM30,000.00, have been provided for under the Legal Aid Act 1971 and its Regulations with a payment of RM10.00.

Accordingly, Johor women who need legal aid for civil legal cases in their households should refer to the Legal Aid Department, which involves lower costs. However, for the information of the Honourable Member, YPKDT continues to implement counselling services to clients who come to the YPKDT office to seek advisory services. Up to December 2020, YPKDT has handled a total of 57 counselling cases involving issues in marriage and family. Meanwhile, through JKM, from January to October 2020 the departmental counsellors have conducted a total of 970 counselling sessions for clients from various target groups.

In addition, a total of 2,161 clients affected by the COVID-19 pandemic have undergone short-term intervention and crisis intervention sessions with counsellors. The counsellors have also conducted a total of 1,222 psychological tests on clients and carried out 97 psycho-educational programmes involving a total of 5,093 participants.

Madam Speaker, Honourable Johor Jaya has proposed to establish a shelter or temporary transit home for women experiencing family problems. The state government, through JKM, has also established shelters or temporary transit homes so that those facing domestic violence or violence against women can be assisted immediately. Under the department's management, safe places have been provided, which are gazetted under the Domestic Violence Act 1994 since 15 December 2006, and in the state of Johor there are a total of 4 gazetted institutions, namely:

1. Rumah Seri Kenangan Johor Bahru 2. Taman Sinar Harapan Tampoi

3. Taman Sinar Harapan Jubli 4. Desa Bina Diri Mersing

The Social Welfare Department has also obtained cooperation from agencies such as women's assistance organisations as well as the Johor Women's Movement organisations and the Johor Islamic Religious Council in providing protection to victims of domestic violence. For the information of the Honourable Member, if the victim lives in their own residence or the residence of a relative, there are legal provisions under the Domestic Violence Act 1994 (Amendment) 2017 which aim to protect victims during the waiting period for investigation. Under the provisions of the Act, victims may obtain interim protection under Section 12 of the Domestic Violence Act 1994 (GAKRT 1994), protection orders under Section 13 of the Domestic Violence Act 1994, and emergency protection orders which will be assisted by the protection officers of the Social Welfare Department. According to the department's records, based on cases, most victims choose to stay at the homes of acquaintances and family members. Statistics for 2019 show that 5 cases chose to stay temporarily at the homes of acquaintances and 1 case at a family home. In 2020, a total of 5 victims chose to stay at the homes of acquaintances.

Madam Speaker, before answering the issue raised by Honourable Johor Jaya regarding the current status and next plans within the Mama Friendly Room, I would like to extend my congratulations to Honourable Johor Jaya, who has initiated the provision of breastfeeding spaces for working mothers to further encourage breastfeeding activities for babies. For the information of the Honourable Member, the total number of Mama Friendly Rooms provided up to November 2020 is 52 rooms, benefiting more than 209 users. This programme has evidently received a good response from the people of the state of Johor, especially school teachers. This programme will also be continued in 2021 and expanded further to government agencies, private sectors, local authorities (PBT), public and private higher learning institutions and shopping centres.

Madam Speaker, I also extend my thanks to Honourable Parit Raja, who took an interest in the initiatives implemented by the state government to empower and activate the role of Johor women. Regarding the issue raised by Honourable Parit Raja on the specialisation of women in the agricultural sector. I would like to inform that the state government, through YPKDT, has answered the challenge by carrying out the People's Economic Development Project (PROPER) in 2020, with the participation of 56 persons involving 10 districts in the state of Johor. Of the 56 participants, 39 were women. This shows that YPKDT provides a special space or quota for women in carrying out agricultural projects, and this is proven by the highest total yield produced by the community coming from Batu Pahat and Kluang, where the participants of the PROPER project are entirely women. Up to now, the district of Batu Pahat has obtained a yield of RM10,140.60 and the district of Kluang a yield of RM5,946.10. Based on this data, it is clear that women are able to sit at the same level and stand at the same height as men. I am confident that women can.

I also believe that under the agriculture portfolio, the Honourable EXCO for Agriculture, Industry and Asas Tani has allocations that can be utilised by women agro-entrepreneurs, as announced by the Most Honourable Menteri Besar in the Johor Budget 2021 regarding the Johor Tani Agenda.

Madam Speaker, regarding the food basket assistance provided by JKM to the target groups as raised by Honourable Pasir Raja, I would like to inform that during the period of the Enhanced Movement Control Order (PKPD) for districts determined by the Ministry of Health, the food baskets provided include fresh food items. Meanwhile, for food basket assistance outside PKPD areas, based on the SOP set by the JKM headquarters, only 12 dry food items are specified in the food basket. Fresh food assistance is provided in coordination with other agencies and NGOs. This is to prevent the items from spoiling due to being stored for a period exceeding 3 days.

Madam Speaker, Honourable Buluh Kasap has brought forward a proposal for the government, the state government also, to focus on the welfare of single fathers. I feel this is a good proposal. And God willing, through the Johor Caring Agenda, namely the development of women and family data in the state of Johor, we will first identify data on men with single-father status. For assistance under YPKDT, there are various programmes in which we can involve single fathers, and in fact we have no objection to involving single fathers in existing programmes such as PROPER, the Johor Entrepreneurship Aid, the Food Delivery Package, courses for income enhancement and other suitable programmes. Moreover, JKM also provides assistance to single fathers through their children who are in school, under the child aid. The rate of the child assistance scheme is a maximum of RM450.00 per month, namely RM100.00 for each child in the family. Based on JKM statistics up to December 2020, a total of 5,719 families have received child assistance throughout the state of Johor. Of the total number of child assistance recipients, 552 are single fathers, with expenditure amounting to RM138,000.00 per month, benefiting a total of 1,656 children.

Madam Speaker, this is all that I can convey for this winding-up session. Once again, I thank all Honourable Members who have given views and proposals involving departments under the Women, Family and Community Development portfolio. However, if there are follow-up questions that have not been answered, the Honourable Members may contact my office directly to obtain a written reply. I would also like to extend a thousand thanks to all heads of departments and departmental staff under the Women, Family and Community Development portfolio who always work tirelessly and stand ready with all the duties entrusted to them.

For the information of this honourable House, today is the World Persons with Disabilities Day 2020 with the theme "Building the Well-being of OKU, Facing Change". I hope all members of the public will continue to take care and show concern for this special group, because they are also part of us. I also urge persons with disabilities to continue striving and to seize the opportunities and initiatives given by the federal government and the state government to them.

In closing, on this occasion, I would with great pleasure like to extend a thousand thanks to all frontline workers, namely hospital staff in both government and private hospitals, members of the Police, members of RELA, the Social Welfare Department, media personnel and volunteers who work tirelessly to protect the people of Malaysia in combating the COVID-19 outbreak. Let us pray that the COVID-19 outbreak can be controlled and eventually be tackled well.

A satin shawl draped on the queen, Fine, rippling in dappled hues, PWKM cares, the people are helped, Together we help while building a glorious Johor.

Melur motif, embroidered kebayat, Fine arrangement, artful order, Johor's budget cares for the people, Resilience for the sake of prosperity.

Thus concludes. Wabillahitaufik walhidayah, wassalamualaikum warahmatullahi wabarakatuh. I humbly ask for support.

Deputy SpeakerEN

The Honourable Member of the Public Works, Transport and Infrastructure Committee, please.

Tuan Haji Mohd Solihan bin BadriBERSATU · PHChairman of the Committee on Public Works, Transport and Infrastructure · TenangEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi taala wabarakatuh and peace be upon you. All praise be to Allah SWT, and blessings upon the great Prophet Muhammad SAW.

Honourable Madam Deputy Speaker, first of all, Tenang would like to take this opportunity to humbly offer, with gratitude, the highest congratulations and well wishes to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Ta'zim, on the occasion of His Royal Highness's birthday on 22 November 2020, corresponding to 6 Rabiulakhir 1442 Hijrah. Patik also humbly offers the highest congratulations to His Royal Highness Tuanku Ismail Ibni Sultan Ibrahim, Tuanku Mahkota Johor, and to the entire Johor Darul Ta'zim football team on their outstanding achievement in winning the Super League Cup for the 7th time this year. Congratulations.

Honourable Deputy Speaker, Tenang would like to record appreciation and thanks for being given the space and opportunity to take part in the Budget Debate session, whose theme is Resilience for Prosperity. Before going further, allow Tenang to touch briefly on Budget 2021 by the federal government led by the Right Honourable Tan Sri Dato' Haji Muhyiddin bin Haji Mohammad Yassin, Prime Minister of Malaysia, concurrently Member of Parliament for Pagoh and State Assemblyman (ADUN) for Gambir. Last Thursday, we all witnessed Budget 2021, presented by Honourable Senator Tengku Dato' Seri Zafrul bin Abdul Aziz, Minister of Finance of Malaysia, being successfully passed at the policy stage in the Dewan Rakyat after receiving the support of the majority of Members of Parliament of Malaysia. Tenang takes this opportunity in this winding-up speech to extend the highest thanks to the Honourable Members of Parliament for uniting in spirit to ensure that the nation's important budget for the coming year was successfully passed. The highest congratulations are also extended to the federal government led by the Right Honourable Prime Minister for successfully tabling a budget that is caring and close to the hearts of the people of Malaysia and of Johor in general. Indeed, with the permission of Allah SWT, Tenang believes Budget 2021 will also be well received during the Committee stage debate and subsequently passed once again for the sake of the nation and the people we love.

Honourable Deputy Speaker, Tenang also extends the highest congratulations to the Right Honourable Menteri Besar of Johor on tabling the State Budget for 2021, considering various sectors and paying fair attention in the current situation of facing the COVID-19 outbreak. Tenang also takes this opportunity to extend a thousand thanks to all the Honourable Members who took part in debating the Johor State Budget 2021 and touched on matters related to Tenang's portfolio, particularly on Public Works, Transport and Infrastructure. The rapid economic growth of Johor, which is moving towards becoming a developed, competitive, sustainable and dynamic state, needs to be supported with complete infrastructure and a modern, integrated public transport system of world standard. The state government has a clear direction to achieve the aspiration of modernising the public transport system and state infrastructure. The state government has drawn up several planning schemes involving public transport and infrastructure that complement each other and are arranged inclusively, covering every corner of every area or district in the state of Johor, from Tanjung Piai to Tanjung Emas in Muar. As an example, the Johor State Public Transport Master Plan 2045, which was specially drafted to modernise the public transport system in the state of Johor by taking into account the transport network system across the country. Overall, there are 6 reference plans that will be used as guidance, with various targets to be achieved for the short, medium and long-term phases. Every development plan prepared and implemented must be in line with the plans that have been drawn up or implemented by the federal government. Here, Tenang wishes to record thanks for the role of the Iskandar Regional Development Authority (IRDA) and the East Coast Region Development Authority (ECER), which have also contributed to the development of the state of Johor. Tenang also considers important the role and contribution of PIPC, Pengerang Integrated Petroleum Complex, especially in Pengerang.

Honourable Deputy Speaker, the follow-up issues raised by the Honourable Members of this august House are appreciated, and among them is the Johor Muafakat Bus. Among the matters raised in the debate related to Tenang's portfolio are, firstly, the Prasarana Johor agenda, namely the Johor Muafakat Bus service to increase the number of users of bus services within the districts of the state of Johor. Regarding the question from the Honourable Member for Machap, the PAJ Johor Public Transport has no obstacles to the proposed Johor Muafakat Bus route in the Machap area. Since one of the purposes of establishing this Johor Muafakat Bus service is for accessibility and convenience of the people. If there is a proposal for this route, PAJ will first refine it by conducting a study to determine the level of need for public transport services in this area in more detail, through information such as the total demand for OD, origin destination, and the group of users who want this service. This study is important so that the use of the Johor Muafakat Bus service is not only used by school students, but is used comprehensively by the local residents as well. However, this proposal needs to be tabled at the Traffic Committee Meeting of the Local Authority and needs to be discussed, and further discussion is needed to see the cost impact on the state government and the local authority of the area.

The Honourable Member for Yong Peng and the Honourable Member for Sedili also stressed the same issue regarding the Johor Muafakat Bus route in the areas of the Honourable Members. Discussions in the area with the Honourable Members have been carried out by PAJ, and route checks and studies have also been conducted to obtain the views of residents on the suitability of the route to be implemented. This matter has been detailed, including the operating costs in the area, and will be tabled at the State Executive Council (MMK) meeting to obtain approval. The latest process is that the Johor Public Transport Corporation is waiting for approval from the MMK regarding the proposed route.

Honourable Madam Deputy Speaker, as for e-hailing, during the pandemic that is sweeping the entire country, the government is very concerned about the economic issues that are deteriorating. Tenang is sure that many people out there have been affected by the spread of this pandemic, especially when the government announced that the Movement Control Order (PKP) and the Conditional Movement Control Order (PKPB) had to be implemented. Therefore, regarding the question from the Honourable Member for Mahkota on e-hailing and taxi drivers who have been affected, the government has implemented various efforts to help e-hailing and taxi drivers affected by COVID-19. Among the initiatives implemented by the government is the provision of the National Caring Aid (Bantuan Prihatin Nasional) of RM500.00 to eligible e-hailing drivers and RM600.00 to taxi drivers, one-off. The state government also paid attention through the Johor State Budget 2021 tabled by the Right Honourable Menteri Besar through the Johor Caring Agenda, namely cash payments of RM100.00 to 20,000 e-hailing drivers and food delivery riders in Johor, as well as a cash payment of RM500.00, one-off, to 5,205 owners of limousine taxis and airport taxis. In addition, taking into account the suitability of drivers to generate income at this time, the Ministry of Transport has also given leniency to vehicles that have exceeded the age limit to continue operating for one year, provided they are subject to the approval of the PUSPAKOM inspection of the vehicle. Temporary measures to reduce the impact of the Corona Virus disease that were gazetted and enforced on 23 October 2020 will also help e-hailing and taxi drivers to carry out services as goods vehicles. For example, parcel delivery and others.

Honourable Deputy Speaker, there was mention of illegal jetties that should be licensed in order to obtain or increase government revenue, and Kempas touched on this matter. In the state of Johor, which is growing rapidly like mushrooms, he said there are many illegal jetties in this state, for your information. The growth of development in the state of Johor has contributed to applications for private jetties at the Johor Land Administration. The Johor Land Administration acts on every application received, especially on the aspects of land law that are in force. Therefore, there are several land disposal mechanisms that can be implemented under land law, such as the Temporary Occupation Licence (LPS), alienation and grant of ownership. I feel this information is useful to all the Honourable Members, especially those whose constituencies are located along the coast and who have issues regarding jetties, whether illegal jetties or jetties that have been licensed. In this regard, the Temporary Occupation Licence (LPS) is a form of land disposal by the State Authority, namely a method by which the State Authority allows land to be occupied or used as provided under Section 42(1) & (c) and Section 66 of the Kanun Tanah Negara 1965. Applications for LPS can be submitted to the District Land Office (PTD) to be processed and then raised for consideration by the State Authority. Among the LPS applications received are those for the purpose of building jetties. Besides that, the location of the jetty and its structures are in the waters and involve security issues, so the suitable period for LPS approval is granted for 3 years and renewed every year, where it must be submitted at the District Land Office.

In addition, jetty applications can also be disposed of by way of alienation under Section 62 of the KTN 1965 for the purpose of a Reserve for the Controlling Officer named as to manage, to administer, to supervise and to control the jetty. Approval of alienation is granted based on conclusive evidence that the land described is reserved for public purposes, whether the construction is by a government agency for public purposes. Whether the construction is by a government agency, whether federal government or state government, and the party responsible for public facilities or national interest. In particular, alienation may further also be carried out for jetties used for the socio-economic benefit of the state and nation, such as tourism jetties, fishery jetties, jetties at ports and so on. Following that, another form of land disposal for the purpose of jetties may also be implemented by way of grant of ownership under Section 76 of the Kanun Tanah Negara 1965, which gives exclusive interest to the registered landowner. Responsibility and control lie with the registered owner.

Among the approaches that the state government can take is that for private and commercial jetties located at the frontage of state waters, whether sea, coast or river, ownership may be given to the Johor State Secretary Corporation (SSI) with a lease period not exceeding 21 years, and the SSI may lease to individuals or companies for specific jetty purposes. However, the State Government Authority may set a lease period exceeding 21 years. In the context of the Johor Land Administration, applicants for jetties will be referred to several technical departments such as the Malaysian Maritime Enforcement Agency, the Drainage and Irrigation Department (JPS), the Public Works Department (JKR), the Marine Department Peninsular Malaysia,

the Johor Water Regulatory Body, PlanMalaysia, the Department of Environment and several related departments. Furthermore, applications received will also be referred for consideration by the District Security Committee chaired by the District Officer.

Based on current records at the Johor Land Administration, there is a total of 186 jetty operators in the state of Johor, of which 49 have already been approved by the state government. A total of 37 applications are still under action by the Johor Land Administration to be brought for consideration to the State Authority. And there are also questions or queries for incomplete documents and the action of comments from technical departments. As for the rest, no official application has been received at the Johor Land Administration.

For the information of the Honourable Member for Kempas as well, the implementation of jetty regularisation action has been carried out in several districts, among them the district of Batu Pahat and Mersing. This proactive action is to ensure that no illegal jetties are built along the rivers and to monitor enforcement on approved jetties to comply with the conditions of approval and the activities permitted on the jetty. Unlawful occupation of government land is an offence and action can be taken.

Honourable Deputy Speaker, there is a question regarding the second port in Batu Pahat. A privatisation agreement has been signed for development on Lot PTD 504 Mukim Bagan and Lot PTD 1668 Mukim Peserai, Batu Pahat, Johor. The development components of this project originally covered liquid bulk, marine yard, container yard, general cargo terminal, CIQ site, police area and ferry terminal, as well as residential and shop-office components, with permission, which in English just now, Madam Speaker. However, the company has made an application to the state government earlier this year for amendments to the plan, layout and changes to the new development components. These changes need to be scrutinised because they involve matters related to returns to the government compared with the original proposal.

Honourable Deputy Speaker, I acknowledge that there are some issues relating to the position of the jetty at Jalan Syahbandar which indeed cause some problems, namely congestion, and along the Sungai Batu Pahat road it has also been identified that there are illegal jetties that have not been registered. For your information, according to the PTG's check, the jetties located along Sungai Batu Pahat, some of which are on JPS land, applications that have been made and have decisions of approved and active: 2. Applications that have decisions of rejected: 12. New applications still under action by PTD: 3.

Honourable Madam Speaker, I would like to thank the Honourable Members who are very concerned about issues of road and bridge projects in the constituencies of the Honourable Members. For 2021, the state government has allocated RM53 million for development projects for next year alone, containing 40 titles. So, the list is long, but I will comment here on what has been raised.

The Honourable Member for Parit Yaani mentioned when the Jalan Bindu upgrading project will be fully completed? For the information of the Honourable Member, the project has already been given the first and second extensions of time, where the first was due to the factor of delay in land reacquisition, while the second extension of time was given due to the MCO factor that entitled the contractor to apply for an extension of 114 days. However, the Jalan Bindu upgrading project has so far reached up to 93% completion. And the actual completion date of the project after obtaining the second extension of time was on 22 December 2020. The second matter raised by the Honourable Member for Parit Yaani is the status of the road and traffic light of Bindu Religious School. For the information of the Honourable Member for Parit Yaani, oh Parit Yaani is not here. JKR Batu Pahat District has already applied

to upgrade the existing traffic light from 3 phases to 4 phases under the Johor 5-Year Plan, RJTS-5.

Next, Honourable Deputy Speaker, the Honourable Member for Endau mentioned the project to widen the existing Mersing Bridge which was cancelled because there was a proposal to build the Mersing bypass as an alternative route, where this alternative route will help reduce congestion in Mersing town. This new route has been included in the RMK-12 that has been submitted to the Ministry of Public Works. The priority was included in the second priority in the list. However, the latest information on the project is that it was not selected for Rolling Plan-1 and may be selected in the next rolling plan. JKR Johor has placed the application for the Mersing bypass project as the second priority, but JKR has in turn slightly changed its planning by prioritising the furniture hub in Muar first to be implemented because it is more important as a result of the visit of the Minister of Economy and the Right Honourable Prime Minister the other day, after assessing the economic impact on the development of the area concerned.

Honourable Speaker, Tenang next once again on the matter debated by Penggaram regarding the traffic light site at the Kluang Junction in Majlis Batu Pahat, Tanjung Labuh. JKR has taken note of the issue, and for the information of the Honourable Member for Penggaram, the developer has not yet carried out the process of the Certificate Of Completion And Compliance, CCC, with permission, and because of that, the project has not yet been handed over to the relevant agency that is responsible.

Next regarding the status of the project to build the new Jalan Kampung Rahmat road across the estate in Sri Gading, Batu Pahat, Johor. According to the actual schedule, the project was to be completed on 28 September 2020. However, JKR found that this project has experienced delays based on the percentage of work that ended on 23 November 2020. JKR, the progress of work is still late by 7.24% for premix works, road furniture and electrical work, with permission. After taking into account the current performance on site, it was found that the problem faced was a shortage of manpower. JKR takes seriously the issue of the failure of contractors who cannot complete projects within the stipulated time. Therefore, the contractor has been subjected to LAD, liquidated damages for lateness, with a total amount of RM5,303.30 per day.

Honourable Deputy Speaker, Bukit Kepong asked about the construction of the Bukit Pasir bypass, the widening of the Muar – Pagoh road, and the upgrading of several bridges on the Muar – Labis road. For the information of the Honourable Member, the Bukit Pasir bypass project is currently at the detailed design stage by the appointed consultant. The tender process will only be carried out after the land reacquisition process is completed, which is expected to be completed at the end of next year. For the bridge project, namely the project to upgrade the Sungai Tui bridge, it is also in the design process and this project is expected to be tendered in the middle of next year.

The Honourable Member for Mengkibol discussed the status of the project to upgrade the road in Sri Lalang, Kluang, which has been completed. Detailed studies have been carried out and have been included in the application for the Twelfth Malaysia Plan (RMK-12). However, this project is still not listed for implementation in RP-1, and JKR Johor will continue to list this project as a priority in the next rolling plan.

Honourable Deputy Speaker, Tenang will continue with the matter raised by the Honourable Member for Permas, namely regarding the proposed upgrading work to widen the space of the Sultan Abu Bakar Complex. For the information, the upgrading work to widen the space of the Sultan Abu Bakar Complex to accommodate more tourists, with an estimated cost of RM16 million, is still at the planning stage and design review by the internal security authorities. However, the work to repair the covered roof to prevent splashing when it rains is almost 60% complete and is expected to be fully completed on 13 January next year. JKR is also carrying out other facility repair works at the Sultan Abu Bakar Complex with an overall estimated cost of RM18.5 million, which cost does not include the cost of upgrading the import and export bus terminal, including the addition of roofing to the bus parking area, totalling RM16 million as mentioned earlier.

Honourable Deputy Speaker, for the information of all Members of this House, the Malaysian Road Record Informal System (MARRIS), which is used for recording road data across the whole state, covers state roads, municipal roads, low-cost housing estate roads, back lanes, one-way roads, tourist areas, village roads and agricultural roads. Therefore, the road under the Pasir Gudang Highway raised by Johor Jaya and also Permas cannot be registered under MARRIS. Maintenance work on the Pasir Gudang Highway falls under the federal concession. However, allocation has been requested for next year to further strengthen part of the structure of the Pasir Gudang Highway with a value of RM7.6 million, which will be implemented as soon as the allocation is received, and the road upgrading programme from 4 lanes to 6 lanes from Seksyen 22 along 5.5 kilometres is also in the design phase and is expected to be tendered in May 2021.

Honourable Deputy Speaker, I feel this answer is rather long, but I have tried to take the important points, including the problems or issues raised by Kemelah, namely regarding the electricity supply in the Segamat 2 industrial area.

Tenang wishes to thank the Honourable Member for Kempas, and this concerns the views of the Honourable Member for Kempas regarding the road reserve or reserve of the Local Authority, PBT, in relation to electricity poles. It is well known that TNB is a company owned by the federal government, and all decisions relating to policy and direction are subject to decisions of the federal government, taking into account the Electricity Supply Act 1990 and the regulations under it. For electricity substation sites that need to be built for development purposes and upgrading electricity infrastructure, the land acquisition process under the Land Acquisition Act 1960 must be carried out. It involves individually and privately owned land. For government land, TNB needs to apply for a lease for a specific period, namely through Serah Balik Kurnia Semula, for the purpose of providing electricity supply infrastructure for development purposes. For poles and cable routes, whether above or below ground, TNB only obtains permission for passage only, as provided in the Electricity Supply Act 1990. Apart from the additional costs that will be imposed on TNB, this will affect the existing tariff rates, where the current tariff is among the lowest in the world.

The Honourable Member's proposal is not being belittled; on the contrary, it requires more serious study because it involves several ministries such as the Ministry of Finance as the largest shareholder in TNB, the Ministry of Energy and Natural Resources, and also the Ministry of Economic Affairs. Honourable Member,

Deputy SpeakerEN

How much longer, Honourable EXCO?

Tuan Haji Mohd Solihan bin BadriBERSATU · PHChairman of the Committee on Public Works, Transport and Infrastructure · TenangEN

I want to finish, there is actually more, but I think I can give this answer to the Honourable Members in writing later.

However, I want to end my winding-up by commenting briefly. Paloh mentioned that perhaps our fate is uncertain in the future, perhaps there, perhaps here, right. But what we need is to be committed to our duty. Only, I humbly request to end with 2 quatrains of pantun, Honourable Deputy Speaker, but in a somewhat sung form. Earlier the Honourable Speaker gave permission, and I think the Honourable Deputy Speaker also gave permission. May I? (Singing).

Johor's title, Tanjung Puteri, the waters of the Tebrau Strait are blue. The opposition now grows ever more learned, having gained experience in governing the state. On Tanjung Puteri Hill, the lovely pleasure park shines brightly. Wherever Tenang stands, may the prayers come true and make him a Minister. (The House laughs).

That is all, Honourable Deputy Speaker. The Members of the House have touched on much more, and I will write to the Honourable Members to give explanations. I end this winding-up with the utterance wabilillahitaufik walhidayah wassalamualaikum warahmatullahi taala wabarakatuh. Tenang humbly seconds the motion. Thank you.

Deputy SpeakerEN

Thank you, Honourable EXCO. Because of that singing, everyone is now full of spirit. (The House laughs). Honourable Chairman of the Committee on Housing and Local Government, please.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Assalamualaikum warahmatullahi taala wabarakatuh, salam sejahtera, salam Makmur Johor. Honourable Madam Speaker, Honourable Members of the Johor State Legislative Assembly, Honourable Dato' PKN, Honourable Legal Adviser.

Thank you to Honourable Madam Speaker for giving Rengit the opportunity to take part in the debate on the 2021 Budget this afternoon, which is raining, after listening to the singing from Tenang earlier. First, I respectfully offer my greetings and well wishes to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, the Ruler of the State and Dependencies of Johor Darul Ta'zim, on the occasion of His Majesty's birthday on 22 November, corresponding to 09 Rabiulakhir 1422 Hijrah. I also respectfully offer my greetings to His Royal Highness Tunku Ismail Ibni Sultan Ibrahim, the Crown Prince of Johor, and to JDT, which won the Super League for the 7th consecutive time. (The House applauds).

Honourable Madam Speaker, firstly Rengit would like to extend, and record, congratulations to the Honourable Menteri Besar on the tabling of the 2021 Budget under the theme "Berdaya Tahan Demi Kemakmuran" (Resilience for Prosperity). A person with an engineering background has been entrusted with steering a ship sailing through turbulent seas, with big waves, unceasing winds, and typhoons occasionally striking the vessel being steered. Alhamdulillah, the ship continues sailing towards its destination. The Honourable Menteri Besar has been entrusted with managing the state of Johor while Johor and the country face the major challenge of the COVID-19 pandemic. He is determined to make agriculture the source of income for the state of Johor in the future, with 3 strategies: the Food Security Plan, Digital Johor, JETCO, together with 12 agendas of Johor Caring, Empowered and Successful.

Honourable Madam Speaker, agriculture is no longer merely a business, borrowing the slogan of the former Honourable Prime Minister, Pak Lah, but agriculture is also unity. Honourable Madam Speaker, this is what I say because in this House everyone talks about agriculture. With the same tone and the same hope, whether on the government side or our friends over there, everyone agrees that the Johor Food Security Plan should be expedited.

Honourable Madam Speaker, I would like to congratulate the Honourable Speaker, who is not in the House, and also Honourable Madam Speaker, for demonstrating a very high level of professionalism in handling the affairs and proceedings of the House (The House applauds). Since the big challenges and political waves of Johor, Honourable. I have been in this Johor State Legislative Assembly for 17 years without a break, may Allah forgive me. I can say that our Honourable Speaker is among the best in our country. (The House applauds). Likewise our Madam Speaker, from Penggaram, who is firm in handling the House without regard to the government or her friends. Many congratulations to Madam Speaker. (The House applauds).

This is the uniqueness of Johor, this is the distinctiveness of Johor as mentioned by Kukup. Some may say that my statement is rather cynical because the YB is now at the government level. So can I speak like that? No. I want to emphasise in this honourable House that since 2004, since I became the people's representative in my constituency, the promoter of the Excel Pendidikan Rengit programme, my helpers were all teachers from PAS who assisted me when UMNO and PAS were still at war. There was no National Consensus (Muafakat Nasional) at that time. I adopted the approach that as a people's representative, all groups are equal, and many of them helped me, and at one point the PAS Branch wrote a letter to the Honourable Menteri Besar, asking that I be retained in the 2008 election.

Honourable Madam Speaker, I also want to tell this honourable House that at one time in 2014 and 2015, I once discussed with Honourable Madam Speaker, at Hotel Pelican, over afternoon tea. At that time I was still in the government, about the proposal to establish a select committee in the Johor Assembly. The witness is still here, still alive. Is that right, Honourable Madam Speaker? Look, she is not nodding. Ha, she is nodding. We discussed setting up a select committee in the State Legislative Assembly. But the efforts I tried to make, Honourable Madam Speaker, failed because some may not have been able to accept what we proposed. We need a new politics, a new approach in an age that demands openness and also transparency from all parties.

Honourable Madam Speaker, I would like to thank all Members of the House who raised matters relating to Housing and also the Local Authorities. The Housing and Local Government portfolio is a challenging responsibility, at the age of 61. It is not easy, the challenges are heavy, the trials are sometimes, Honourable Madam Speaker, such that I cannot sleep. Recently I have often woken up, dreaming of Bekok, Senai and also Tangkak. Bekok asks when they will appoint these Council Members? Senai, in my dream, makes a mural drawing of the Council Members without faces. Tangkak says, it's alright. Let us just do the work even though there is no post for the Chinese Community Leaders whose services have been terminated. These dreams, Honourable Madam Speaker, cause me to stay awake late at night.

Honourable Madam Speaker, I begin my speech with a pantun. The story of a bird and also a frog. The Serindit bird is held and flies away, / the Bayam frog leaps and dances, / the theme Berdaya Tahan has been given its name, / for the lasting prosperity of Johor.

Honourable Madam Speaker, if this speech text looks long, I have tried to summarise it as concisely as possible within the limited time. Under the Housing portfolio, Honourable Madam Speaker, in the 2021 Budget, the Honourable Menteri Besar announced RM310 million for us to build more affordable housing (Rumah Mampu Biaya). We will use all the strengths of the resources available at all levels, from the government, the private sector, and developers, to help offer more affordable housing for the M40 and also B40 groups. We use state government land resources and the financial resources available. Whether money or funds related to contributions or penalties, it does not matter whether the money comes from the Housing Infrastructure Fund or other infrastructure, to build these houses. Helping developers by giving them leeway to provide affordable housing, inviting government-linked companies to build affordable housing, inviting public-listed companies with attractive offers regarding land, with low land costs. Other steps we have taken are strengthening data at field level and identifying developers' projects and the locations and number of affordable housing units in every district.

Honourable Madam Speaker, hopefully in these 5 years it is not rhetoric, insya-Allah we will strive to build at least 50,000 housing units. Honourable Madam Speaker, the Housing portfolio is also determined to ensure one family, one home. The slogan was coined by the Honourable Member for Kota Iskandar. The portfolio also, at the same time, as mentioned by the Honourable Menteri Besar in the 2001 Budget, will provide a voucher of RM3,000.00 to those who successfully occupy affordable housing, rent exemption for PPR, RSK from 1 January to 31 December for 9,000 people. The Johor Caring Housing Scheme, 10 million Rent To Own with Maybank, which I will comment on later, the construction of Johor Ihsan Housing, 20 million, the Quality of Life Study for PPR and RSK, 1.5 million, the Property Expo in Johor, as well as strengthening cooperation between the Housing Division and the Johor State Housing Developers Association, and changing the approach of officers and staff of the Johor State Housing Division from enforcement officers to marketing officers, becoming partners of buyers and also developers.

Honourable Madam Speaker, at the same time, local authorities (PBT), PTG and private developers must ensure that the development of affordable housing goes together with other housing projects. It is also accompanied by a transition campaign, and under the federal government we will strive to ensure that this people-friendly housing can be continued.

At the local government level, Honourable Madam Speaker, the exemption of business licence rent, as announced by the Honourable Menteri Besar, for all types of business, especially those related to the Local Authorities, one-off monetary allocations to traders at agro-markets and night markets or other traders, PKS Mikro, the Johor Heritage City Development Plan for Batu Pahat, Johor Bahru and also Muar, the Green Earth Impact Programme, the Planting One Hundred Thousand Trees Programme with a minimum expenditure of RM700,000.00 in cooperation with Wakaf An-Nur, and solar initiatives as raised and previously voiced by Jementah, the Solar Supply Agreement Renewable Energy (SARE) Initiative in all PBT under the Low Carbon Programme. We will start this work because we have been told, the Honourable Menteri Besar has decided in this budget, and this approach I mentioned, we use the PFI approach without involving allocations from the Council. Another is the smart waste coordination initiative at the Pengerang Municipal Council with an allocation of more than RM3.2 million, and the Traditional Village Development Programme in PBT areas, the Johor Digitalisation Programme using existing resources at PBT, and the Pontian District Council Upgrading Programme to Pontian Municipal Council.

Honourable Madam Speaker, I would like to mention, as mentioned by Mengkibol at the end of the Honourable Menteri Besar's visit with me to the Iskandar Puteri City Council, the Honourable Menteri Besar advised the enforcement teams or uniformed teams to adopt a gentle attitude and be friends with everyone involved in the PBT areas; that was the Honourable Menteri Besar's message to enforcement officers during the visit. I hope Mengkibol can understand this approach, and we will try to resolve the matters raised relating to enforcement.

Honourable Madam Speaker, Kota Iskandar raised the matter of affordable housing penalties, where did that money go? Insya-Allah I will discuss with Dato' PKN, Dato' PTG, how much money should have entered the Infrastructure Development Account Group, which was pointed out by the Audit side. The Rent To Own hire-purchase programme with Maybank Islamic, Honourable Madam Speaker, at this early stage we already have Maybank's agreement, from a price of RM250,000.00 to RM700,00.00, after this we will arrange it at a price of RM150,000.00. The advantage of this programme is that it is a fairly simple mechanism for home buyers to obtain bank financing. We give a period of 5 years, and within these 5 years the buyers must discipline their finances, and they can buy the home as I mentioned, using the original price. The conditions for joining this programme are an age eligibility of 18 to 70 years, not having other housing payment commitments, being able to bring a maximum of 3 guarantors, and a credit score. I want to inform you that this is the constraint for many buyers in terms of financing; a weak credit score will be considered. In a normal scheme, conventional, this matter is rather difficult, but under this Rent To Own Programme, a weak credit score will also be considered, and insya-Allah, pray for this programme; if we can finalise it, we will start this programme on 1 January 2021.

It was also raised regarding the proposal of the Johor Housing and Property Board. I would like to inform this honourable House that on 19 August 2020 at 2 pm, the State Secretary's Office Housing Division held discussions with the Legal Adviser for the review of the Johor Housing and Real Estate Board Bill 2014, and we propose that the Honourable Member for Kota Iskandar bring this matter back into the House for consideration and approval. I seek the support of Kota Iskandar to make the implementation of this Johor Housing and Property Board a success. Regarding housing construction raised by the YB for Endau, there are two projects in the Endau area, namely in 2013 Taman Nelayan with 61 units, and Taman Dato' Ajib with 156 units. For the information of the Honourable Member for Endau, the State Secretary of Johor, the Housing Division, will conduct a review of demand data for the Endau area and also Mersing. As for the Honourable Member for Bukit Kepong, who asked about the status of the Johor Land housing project issue, based on information from the Johor State Economic Planning Unit, Johor Land is studying the feasibility of this project because the current economic situation and market demand in the area need to be re-examined.

The Honourable Member for Bekok asked about the construction of low-cost housing in Chaah. Government Council Meeting Number 1452/2017 dated 9 August resolved to agree to the land acquisition (PBT) of SD5218 as Lot 6201, one Mukim Chaah, covering 11.977 acres at a cost of RM1.5 million for the purpose of constructing Johor Affordable Housing by PIJ Holdings Sdn. Bhd., and it is awaiting instructions from the Honourable government. As for SPNB housing in Chaah, for the information of Bekok, the Taman Chaah Idaman Project was halted in construction in 2019 because at the time it was built, the project was less viable to develop for certain factors, and there were no buyers who had signed a sale and purchase agreement at that time, and it was postponed. The SPNB side is in the stage of further study to draft a follow-up action plan for this project, Honourable.

Honourable Madam Speaker, next, the rent exemption for the Public Housing Programme (PPR) and Targeted Subsidy Government Housing (RSK) throughout 2021, which I was told applies to those earning RM4,000.00 and below, and the rather worrying COVID socio-economic situation: we estimate that out of 12,115 housing units, based on a census, 9,101 are eligible tenants who receive this initiative, while 3,014 housing units are ineligible for several reasons. Firstly, they sub-let, renting over rent; secondly, they trespass, entering without permission; and thirdly, they have left the residential premises for more than 3 months, did not submit copies of documents, renewed agreements, and there are criminal cases, drug abuse, vice, theft, and so on. The 3,114 will not be involved in the 2021 Targeted Rent Exemption Programme, Honourable Madam Speaker. As for the PPR Batu Anam Rent-To-Own Programme raised, put forward by the Honourable Member for Buluh Kasap, PPR Batu Anam is a project involving 102 housing units on land measuring 3.6 hectares owned by the Federal Land Commissioner. This project was built by KPKT (Ministry of Housing and Local Government) and was handed over to the State Secretary's Office Housing Division on 27 April. Up to now, for the information of the Honourable Member for Buluh Kasap, there has been no proposal from KPKT to make a rent-to-own scheme available to the tenants in question. Another matter is the special quota and also the KMK quota. For the information of the Honourable Member, the special quota raised by the Honourable Member for Buluh Kasap, the distribution is more or less the same, namely 80% for the public quota, the special quota is also 80%, the KMK quota is also 80%, and its breakdown is the Malay public quota 65%, Chinese public quota 25%, Indian public quota 10%, and the caring quota likewise 65%, 25%, 10%, and this special quota introduced through the MMK Meeting on 12 June 2020, last. Likewise this special quota is 5% for the youth quota, the OKU quota is also 5%, and the Caring quota is 10%. Only the name has been changed, Honourable, but we understand the distribution, and some of them previously used political channels, and perhaps some of this also uses political channels, Honourable.

Honourable Madam Speaker, regarding veterans' housing raised by the Honourable Member for Bukit Pasir concerning the large-scale veterans' settlement camp, it still has to go through the normal housing application process conducted by the government. Semerah also raised the Johor Ihsan Makmur Housing, for those who are in difficulty and poor. In the state government focus group next year, it was agreed for RM20 million, and we estimate roughly 400 housing units that we will build. Regarding the proposal on the veterinary land, Honourable, we may consider building PPR housing to help the 320 people in difficulty in the Batu Pahat area. As for local government, I will try to summarise, Honourable Madam Speaker, what was raised by Parit Yaani, this is the story of Bukit Payung, which is said to be heartbreaking. This project started on 1 June 2018 and is expected to end in 2021. This project uses a sanitary landfill and also WTE, and this is extremely important because on the southern side we have already completed a disposal site. Between the state government land and the federal land we have already done a land swap and it is settled. In the middle, here in Batu Pahat, if it can be completed, insya-Allah this will help in terms of our solid waste management. The only delay is that its EOT is 114 days, Honourable. Parit Yaani also raised, Honourable, Parit Yaani also raised the matter of recipients of the Johor Ihsan Economic Stimulus Package 2020. I would like to explain in this honourable House that we gave that assistance equally to all, Honourable. I would like to give the figures: for these 16 PBT, for the Malay community 25,154, for the Chinese community 22,394, and for the Indian community 2,991, and for other communities 565 people. Those are the figures, Honourable.

Next, the development of the route and bridge connecting Taman Seri Wangsa to Taman Seri Berkat. For the information of this honourable House, the road and bridge were built by a private party and on private land, for use as a shortcut from Taman Seri Wangsa to Taman Puteri Jaya and vice versa. These landowners gave permission to residents to use the road, and the Batu Pahat Municipal Council once helped to patch the road if it was pothole-ridden, on the basis of responsibility. And also out of concern, the Batu Pahat Municipal Council will resolve the problem by repairing the collapsed bridge embankment next year, and based on a review of development applications in the area, there is a lot next to Taman Seri Wangsa that has passed Planning Permission (KM) and has the potential to be connected to Taman Seri Berkat,

if adjacent lots also submit Planning Permission for development, for the information of the Honourable Member for Parit Yaani.

Next, Honourable Deputy Speaker, Bukit Pasir raised a review of the implementation of the Muar District Local Plan 2030 so that it does not burden local communities with development that does not align with the characteristics of a smart city. Honourable Madam Speaker, from 15 November 2020 to 15 December 2020, the Publicity Exhibition Programme was conducted simultaneously at 5 locations, namely Muar Intan Jubilee Hall, the MPM Landscape and Development Department Office, the Muar District Office, the Muar Land Office, and the PLAN Malaysia Johor Office, Kota Iskandar. So, the Honourable Member for Bukit Pasir may check these planning documents, and everything is open for giving any comments, proposals, views, or objections to any content of the draft RTD Muar 2030 Replacement, and all proposals and objections will be received during the publicity period and also public participation, which will be brought to the consideration of the Science and Local Committee and the Statesmanship Committee before the RTD is gazetted and subsequently for future application.

Regarding the sewage matter raised by Kempas, I will speed up a little, Honourable. The MPJ system consists of septic tanks, septic tank terminals, column opsidenal, semi-mechanical, and many more, Honourable, I think. For your information, there are 185 that are maintained by MBJB, and according to their design, they follow the standards set by JPP and also SPAN. All development in this area follows the Planning Permission that has been set.

MBJB currently maintains 98 public sewage treatment plants and 37 pumping houses in the MBJB administrative area through annual maintenance contractors until handover to the agency appointed by the government. However, MBJB is ready to hand over the operation of this plant at any time to a party with more expertise so that it is better managed and systematic.

Honourable Deputy Speaker, regarding what was raised by the Honourable Member for Skudai, concerning this One-Stop Centre 3.0 Plus Online, for the information of the Honourable Member for Skudai, the system vendor appointed by KPKT in the implementation of OSC 3.0 Plus is a guide for internal and external technical agencies, developers, consultants, professionals, the public, and all parties with an interest in the issuance of building permits in the Local Authority areas. The purpose of implementing this OSC 3.0 Plus system is to create uniformity in implementation across all PBT, and it is an improvement in the government service delivery system in terms of development control covering all stages of construction. Epbt will be continued for the information of the Honourable Member, and in our efforts to help, it will be continued and strengthened in our efforts to help the digitalisation of PBT efforts in Johor.

Following on from another matter, Honourable Deputy Speaker, regarding what was raised by the Honourable Member for Yong Peng concerning the status of vacant land in PBT areas. For the information of this honourable House, the government has approved several very significant matters regarding the status of uncultivated land in PBT areas, and the government has approved, firstly, the Community Garden. This is community involvement in making small gardens for self-sufficiency needs, and we have made its roadmap, we have prepared a guidebook and will launch it in the near future. Another is the Urban Garden. This was raised a lot by Members of the House, and insya-Allah Honourable Madam Speaker, this paper has also been approved by the government. We, together with PLAN Malaysia, the Agriculture Department, PBT, and PTG, will identify vacant land of more than 1 acre, developers' land, commissioner's land, federal land, state government land or GLC land that is not cultivated, so that we can develop it as an urban garden. This

is based on a commercial-based garden. We are doing this, and its handbook has been completed, insya-Allah Honourable. We will call the industry players involved so that we can ensure the abandoned gardens in PBT areas can be developed to help the Johor state food security plan.

In answer to the question from Yong Peng about the PBT's action to repair the dirty, damaged drainage system that has the potential to become a breeding ground for mosquitoes. Several actions have been taken by the Yong Peng District Council to overcome this problem. For Jalan Kota 8, cleaning action has been carried out by MDYP, or the Yong Peng District Council. For Taman Desa, for the information of the Honourable Member, discussions with the developer have been held. For Taman Damai Jaya, it involves the Irrigation Department and bilateral discussions have been held to overcome flood problems that require allocations and cooperation from the complainants to build drains. As a result of the discussions, the JPS side will agree to deepen the area in Taman Damai. I would also like to congratulate Yong Peng, although in a situation where the challenges are quite large, you always raise issues related to the Honourable Member's constituency.

Another matter raised by the State Assemblyman for Tangkak, the Honourable Member for Tangkak, concerning the vacancy of community leaders. This is always, Honourable Member for Tangkak, I often dream at night as I mentioned earlier, give me a little time to help and resolve this, and I expect this matter can be resolved by early next year at the latest. It is also difficult for me to find this formula; sometimes I spend a long time discussing it with colleagues.

Another matter raised by Parit Raja concerning hawker business space, food aid, in the MPBP area, in the area of the Municipal Council, the Parit Raja Public Market will be upgraded. For the information of Parit Raja, in 2021, and we are currently reviewing the addition of business spaces given that the available site area is limited. Another, the daily hawker sites in Taman Kristal, Taman Cempaka Biru and Taman Universiti, where each place can accommodate 20 hawkers, so far do not impose any rental charge on the parking bays and only impose a cleanliness contribution payment condition of RM60.00 a year, and a hand-cart permit of RM9.00 a year, and this I will discuss again with the council so that, if possible, we can help these traders. As for the placement of food trucks, the MP has placed them at Taman Universiti, and there are 4 food trucks in the hawker area. And for the information...

Deputy SpeakerEN

Honourable EXCO, 3 more minutes, may I?

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Ok, I will try to finish. If there is no time, I will answer in writing, Honourable Member. There are still many points raised, some relating to hawkers, and some relating to food aid raised by Pasir Raja. There is a matter raised by the YB from Serom. This one I think I must answer, because it is important. Regarding the decision of Majlis Daerah Tangkak not to allow the farmers' market traders and the morning market traders, I think it was a rather mistaken decision made by the District Council, because the decision at state level has determined that a risk assessment must be carried out, as decided by the District Health Office. The District Council cannot make its own decision without referring to the District Health Office. So, it should not be closed in the very challenging circumstances at this time, and I will ask Majlis Daerah Tangkak to review the closure of all markets, and if possible we will open them as quickly as possible.

Honourable Tiram has raised many issues of infrastructure, and Permas also raised the matter of the restoration of Sungai Kim-Kim. Why upgrade the City Council? I want to announce briefly, Honourable Member, that when this city is upgraded, we will receive a balancing grant of RM5 million from the federal government. This is an advantage. And other issues raised about this digital matter, raised by Tangkak, we will draft a plan so that broadband becomes the 3rd utility for any development project to be submitted to the local authorities (PBT). We know, water and also electricity, and this time broadband must be included in any KM progress project in every development project.

Once again, Honourable Member, regarding what was raised by Johor Jaya, its answer is long. I request, I will answer in writing. And for Endau, I think it has been answered by the Honourable EXCO for Investment, and finally the Honourable Member on these licences that were also raised by Parit Raja and also Endau. We give many exemptions, we give these incentives to 34,835 night market and morning market sites across Johor.

That is all, Honourable Madam Speaker. I conclude this winding-up speech by first of all thanking all the ADUN who have put forward proposals and views, and insya-Allah, whatever shortcomings there are, we will improve. I also want to thank all the frontliners at the local authorities (PBT), at the Health Office, who have greatly helped in facing the challenges of the COVID-19 pandemic across Johor from March until now. Hopefully every effort that we have made will receive the blessing of Allah SWT. I conclude with wabillahi taufik walhidayah. Wassalamualaikum warahmatullahi taala wabarakatuh.

Deputy SpeakerEN

Thank you to the EXCO Chairman of the Housing and Local Government Committee for the praise to the Speaker, and I also believe that differing ideologies do not prevent us from sharing views. Next, I invite the Honourable Chairman of the Islamic Religious Affairs Committee.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Honourable Puan Speaker and all Honourable Members. A thousand pardons, Your Majesty, I humbly beg forgiveness. With all due respect and sincere devotion, I humbly beg leave to offer my heartfelt congratulations on the birthday of His Majesty Duli Yang Maha Mulia Tuanku, on 22 November 2020. I pray to Allah SWT that, by His abundant grace, He grant safety and good health, prolong the life of His Majesty Duli Yang Maha Mulia Tuanku, and further increase His Majesty's royal rank and sovereignty, so that He may shelter all of us justly, and that His Majesty may continue to reign over the throne of the State of Johor Darul Ta'zim in peace and prosperity. I also pray that Allah prolong the life of Duli Yang Maha Mulia Raja Zarith Sofiah binti Almarhum Sultan Idris Shah, Permaisuri Johor. To Duli Yang Amat Mulia Tunku Ismail Ibni Sultan Ibrahim, Tunku Mahkota Johor, and Che Puan Khaleeda binti Bustamam, the Princes and Princesses, and all the Royal Family: may you always be in good health and well-being, and in safety and peace. Amin, Ya Rabbulalamin.

First of all, I wish to extend my heartfelt congratulations to the leader of our state, the Most Honourable Datuk Hasni bin Mohammad, as Menteri Besar of Johor Darul Ta'zim, who has administered the government of the Perikatan Nasional today, and who has effected a paradigm shift by introducing a concept of the people's aspirations grounded in Makmur Johor in the tabling of the Johor Budget 2021. Only a gem expert recognises a gem.

I also thank my fellow Honourable Members who raised several matters relating to the portfolios under my responsibility as Chairman of the Johor State Islamic Religious Affairs Committee. To the Honourable Member, my friend Parit Yaani: the Johor Islamic Religious Council (MAIJ) has distributed a total of RM561,500.00 involving 5,615 orphans under family care who are classified as poor and needy across the whole State of Johor, on a one-off basis, where each orphan received a cash contribution of RM100.00. MAIJ has also implemented the Fidyah Aid Presentation Ceremony for orphans under family care, in all districts, on 24 October 2020, as per the breakdown in the following list, Honourable Deputy Speaker. For the district of Johor Bahru, a total of 1,202 orphans with an allocation of RM120,200.00; for the district of Batu Pahat, 325 orphans totalling RM32,500.00; for the district of Muar, Honourable Deputy Speaker, 1,052 persons totalling RM105,200.00; for the district of Kota Tinggi, 270 persons totalling RM27,000.00; for the district of Segamat, 91 persons totalling RM9,100.00; for the district of Mersing, 407 persons, RM40,700.00; for the district of Pontian, 576 persons, totalling RM57,600.00; for the district of Kluang, 930 persons, RM64,200.00; for the district of Tangkak, 642 persons, RM64,200.00; and the district of Kulai, a total of 120 persons, RM12,000.00; the grand total being RM561,500.00.

Honourable Deputy Speaker, referring to my friend the Honourable Member for Mahkota and Buluh Kasap, regarding assistance to persons who are not recipients of the MAIJ monthly aid: the original proposal was for only 12,000 recipients with a budget of RM2.4 million only. However, MAIJ has added a further RM1 million with an additional 5,000 recipients, bringing the total to 17,000 recipients of special aid who do not receive the MAIJ monthly aid, as mentioned by the Most Honourable Menteri Besar in the budget speech. And for the information of Honourable Deputy Speaker and my fellow Honourable Members, up to today, at 11:50 am, a total of 6,154 persons have already submitted applications to MAIJ, and I hope that, in line with what was suggested by my friend from Mahkota, if there are additions, our side will consider extending the registration period, which begins on 1 December and runs until 14 December.

For the information of the Honourable Member for Parit Raja and the Honourable Member for Parit Yaani: JT Lab has given a briefing on its achievements at the Halal Council Meeting No. 1/2020. JT Lab has informed the meeting about the recognition and accreditation obtained by the Department of Standards Malaysia for JT Lab. The Johor State Halal Council continuously follows and supports the development of JT Lab, in line with the Johor government's aim of making JT Lab a commercial analysis and research centre recognised worldwide. Part of this is in the 2021 Budget speech by the Most Honourable Menteri Besar of Johor. All the functions, capacities and expertise available at JT Lab will support Johor as a global halal hub. I seek the kind cooperation of Honourable Deputy Speaker, as well as fellow Honourable Members and all government departments, to use this JT Lab for all forms of analysis, and I thank two government departments, namely the Johor State Veterinary Department and the Johor State Agriculture and FAMA Department, which have made JT Lab their reference centre.

For the information of the Honourable Member for Parit Yaani and the Honourable Member for Semerah: regarding the latest status of the process for the 37 units of asnaf housing, with the establishment of a trust account at the District Office, the Johor Islamic Religious Council has also obtained the cooperation of the Johor People's Infrastructure Group (KPRJ) and the Ministry of Rural Development (KPLB) in accelerating the construction process. As a result of this cooperation, the construction of the 37 asnaf houses raised, is as follows: the Johor People's Infrastructure Group construction project for the district of Mersing, 10 houses; the Ministry of Rural Development for the district of Muar, 6 houses; the district of Tangkak, 4 houses; the district of Batu Pahat, 1 house. For the District Office of Mersing, 7 houses; the district of Batu Pahat, 9 houses. As requested by my friend the Honourable Member for Parit Yaani, for information, the total number of asnaf housing completed from 2015 to 2020 is as follows, Honourable Deputy Speaker: the district of Johor Bahru, 6 houses; the district of Batu Pahat, 52 houses; the district of Muar, 50 houses; the district of Batu Pahat, 69 houses; the district of Segamat, 24 houses; the district of Kluang, 34 houses; the district of Kota Tinggi, 8 houses; the district of Mersing, 39 houses; the district of Pontian, 30 houses; the district of Tangkak, 42 houses; the district of Kulai, 6 houses; the overall total of 310 houses.

For the information of my friend the Honourable Member for Bukit Kepong: the construction of the Bukit Kepong transit housing, which began in 2017, has experienced delays, because the main contractor was unable to complete the construction of the complex within the period that had been set. For the information of Honourable Deputy Speaker, for the time being, the first warning action has already been issued to the consultant AHK Arkitek Hanan. The latest developments regarding this housing: an application for Planning Permission will be submitted to the Local Authority for the separation of Phase 1, which has been built, namely the surau, balai rewang and stalls, and Phase 2, the construction involving 32 residential units.

For the information of the Honourable State Assemblyman for Bukit Pasir: the Johor government, through the Johor State Islamic Religious Department, has agreed to grant permission to madrasahs and tahfiz centres in the State of Johor to begin learning sessions from 20 December 2020 until the actual end of the school session of those madrasahs and tahfiz centres. However, this permission is subject only to madrasahs and tahfiz centres that have been registered with the Johor State Islamic Religious Department (JAINJ), and madrasahs that are not in a red zone during the period of the PKPB as determined by the National Security Council and the Ministry of Health Malaysia.

Regarding the Islamic Early Childhood Care Centres (PASTI), the Integrated Islamic Core Primary Schools (SRITI), and the Integrated Islamic Core Secondary Schools (SMITI) in the State of Johor, these are private institutions that have not yet registered with the Johor State Islamic Religious Department. However, the JAINJ has already made an appeal to them to register with the Johor State Islamic Religious Department.

For the information of the Honourable Member for Penggaram: the Phase 6 development of religious schools for the next five years does not involve Bukit Pasir, Batu Pahat. However, what was raised by Penggaram, a sum of RM41,742.00, has been allocated in 2019 for the repair works of that school. For the information of Penggaram, a proposal to build a new school building has been submitted to the government on a waqf land of the Johor Islamic Religious Council in Taman Maju. The JAINJ Development Unit and MAIJ will endeavour to build the building through the upcoming construction phases.

To all statements by Honourable Members requiring details of expenditure on religious schools for the years 2019 and 2020, I cannot read them out, Honourable Member, because they are too long. My office will send the lists of repair works for religious schools to all Honourable Members in this Johor State Legislative Assembly, God willing.

For the information of my friend the Honourable Member for Semerah: the Johor State Integrated Religious Primary School (SRAB) has been registered with the Ministry of Education Malaysia as a Government-Aided Religious School (SABK). It began in 2012. The appointment of its teachers falls under the federal government, namely the Ministry of Education Malaysia, along with development and maintenance budgets. Nevertheless, the state government has provided additional allocations to SRAB Johor to cover the costs of maintenance and minor repairs to those schools.

For the information of the Honourable Member for Serom and the Honourable Member for Parit Raja: as of 15 November 2020, the vacancies for permanent Johor Government Religious Teachers, namely Education Service Officers, Grade DG 29, number 948. For the information of Honourable Deputy Speaker, this matter has been noted by the state government through the Johor State Public Service Commission (SPAJ), and efforts are being made to fill the vacancies. SPAJ, in the interview process for qualified candidates for Grade DG 29, has been conducting interviews from 1 November 2020. However, for security reasons, these interviews have been temporarily postponed in view of the effects of the PKPB announcement by the federal government. DG 29 is expected to resume in the near future and begin filling the vacancies in early 2021, with an estimated intake of 500 new candidates, for the information of Honourable Deputy Speaker.

Next, the service scheme for teachers and support staff serving at SAKJ receives attention from time to time. For example, for the permanent DG 29 Education Service Officer scheme, it has been aligned to a grade equivalent to teachers at the Ministry of Education Malaysia, and it requires a minimum qualification of a Diploma in Education. In addition, the salary scheme and other benefits received are the same as those for civil servants. Nevertheless, for contract teachers, namely KAFA teachers numbering 2,090 persons who serve at the Johor Government Religious Schools across the State of Johor, they are able to meet the needs of teachers at the Johor Government Religious Schools. This scheme is as determined by JAKIM and is in line with other states. As for support staff, only administrative assistants are assigned to SAKJ, in accordance with the scheme and current needs at the school administration level of religious schools.

Honourable Deputy Speaker, I will begin the continuation of this. In response to the issue regarding teacher ratios, at present the Johor State Islamic Religious Department uses a teacher-to-student benchmark of 1 to 3.5 on average across the whole State of Johor. To the statement on behalf of Pasir Raja: at present, all government religious schools are not provided with telephone lines. However, the administration of government religious schools in Johor may take the initiative to install telephone lines in their respective schools, with the cost borne by the relevant school welfare body authority, which receives a contribution of RM3,000.00 to RM5,000.00 a year. I thank them for this proposal, and God willing, the Johor State Islamic Education Department will study a proposal paper to be brought to the state government so that it may be proposed that all religious schools in the State of Johor be provided with telephone lines, for the information of Honourable Deputy Speaker.

Puan Speaker, in our efforts to instil the history of the Islamic Sultanate of the State of Johor, starting this year, Year 1, 2 and 3 pupils have begun lessons on the History of the Islamic Sultanate of Johor. For Year 3, 4 and 5 pupils in 2021, and for the special class in 2022. When these pupils grow up, for the information of Honourable Deputy Speaker, they will not be kept in the dark about history by groups who seek to divide the unity of the people of Johor regarding the Sultanate and Islam in this State of Johor. Besides that, we are also proud that Al-Azhar University of Egypt has chosen our country, Malaysia, from among 2 countries in the world, apart from Indonesia, to be made the Arabic Language Learning Centre of Al-Azhar University. In Malaysia, we are even more grateful, Honourable Deputy Speaker, that the State of Johor has been chosen as the Arabic Language Learning Centre of Al-Azhar University, Egypt, and this centre has already been approved by His Majesty Duli Yang Maha Mulia Tuanku Sultan under the name Pusat Pembelajaran Bahasa Arab Dato Sayyid Alwee Al-Haddad, named after the first Mufti of the State of Johor.

For the information of the Honourable Member for Parit Yaani, Tangkak and Yong Peng: the government has directed the Johor Islamic Corporation to study, refine and improve the benefits of these Johor State Senior Citizens' Takaful programmes. In this regard, as I have stated here, the number of applications received in 2019 by state constituency was 11,200 recipients. The number of applications received for 2020 up to August remains at 11,200 and is still pending approval, to reach a total of 28,000 applicants, with the permission of the House.

For the information of the Honourable Member for Senggarang: the government, through the Johor State Islamic Religious Department, has established 16 Our Brethren Activity Centres (Darul Ukhuwah), located in 10 districts within the State of Johor. One Our Brethren Welfare Organisation has been set up in each district to carry out the activities of the Darul Ukhuwah. The role of Darul Ukhuwah includes providing guidance and assistance where any of our brethren require religious education and guidance, including the Orang Asli, of whom so far, for the information of the Honourable Deputy Speaker and the House, a total of 86 teachers from among our brethren and 32 Orang Asli teaching staff have been appointed to conduct guidance sessions for them. A Our Brethren Shelter has also been established in Parit Raja, Batu Pahat, to assist our brethren who need temporary shelter, as well as those who are facing health problems and have no heirs.

Honourable Deputy Speaker and Members of the House, for the information of the Honourable Member for Kemelah: the Family Development Division of the Johor State Islamic Religious Department has opened counselling sessions and advisory services for married couples and families facing household problems during this COVID-19 period, and those related to mental resilience problems. For the information of the Honourable Member for Buluh Kasap: thank you to the Honourable Member for your concern for mosque officials, surau officials and noja. For the information of the Honourable Member, for the 2021 Budget, JAKIM will provide one-off assistance to mosque officials, namely imams, bilals and noja, amounting to RM500.00. However, this assistance does not include surau officials. Accordingly, the Johor State Islamic Religious Department will submit an application to the state government and MAINJ so that the welfare of surau officials is also protected, with an amount to be determined later, by looking at financial capacity.

For the information of the Honourable Member for Semerah: there are a total of 735 Islamic cemetery plots with an area of 3,454 acres across the whole State of Johor. For the Honourable Member, in order to manage the administration of these cemetery lands at present, and for the information of Honourable Deputy Speaker as well, a committee has already been established, namely the Johor State Islamic Cemetery Land Management Fund Committee. And I earnestly appeal to all Honourable Members who have problems regarding the development of graveyard lands in their respective areas to be able to refer these problems to this committee, God willing.

Deputy SpeakerEN

YB EXCO, you have 3 minutes left, okay.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

Honourable Speaker, if possible, I would like to add a little. This is important, Honourable Deputy Speaker. Finally, I wish to clarify the matter of Rahmatan Lil Alamin raised by the Honourable Member for Senggarang, and the ASWAJA Brigade raised by the Honourable Maharani. Honourable Deputy Speaker and Members of the House, the establishment of the ASWAJA Brigade is very important for us in forming a group initiative to defend the faith of Ahli Sunah Wal Jamaah, which has been the cornerstone of the state of Johor all this time.

For the information of the Honourable Deputy Speaker and Members of the House, there is a list of deviant teachings in the state of Johor from 2000 to 2017, totalling 30 deviant teaching groups in the state of Johor. For the year 2000, there were the Kardiani teaching, the Pertubuhan Bahin teaching, and the al-Arqam teaching. In 2001, there was the Gunung Ledang Tangkak teaching, and the Ilmu Tadalik Hakikat Ihsan teaching. For 2005, the Ayah Pin teaching; for 2007, the Meragukan Ustaz Rajid teaching; for 2008, the Ayah Guru Gunung teaching; for 2009, the Layar Bahtera teaching, the Umar bin Daud teaching, and the Ustaz Zin teaching; for 2010, the Kampung Temenin Kota Tinggi teaching, the Minyak Beku Batu Pahat teaching, and the Haji Banuar Kulai Jaya teaching; for 2011, the Taslim Bukit Easter Kota Tinggi teaching, the Ibrahim Kota Tinggi teaching, the Shafie Sahlan teaching, and also the Ajaran Nagara. For 2012, the Wak Jamil Taman Universiti teaching, and the Panji Langit teaching; for 2013, the Tunas Tuhan Harun teaching, the Remaja Geng 14 teaching, the Istigfar Istiniah zikir teaching, and the Kain Putih Kain Putih Kain Kuning teaching; for 2014, the Militia Ibrahim teaching; for 2015, the Nahri Nashi teaching; for 2016, the Zikir Nafas teaching; for 2017, the Yayi teaching. Finally, Honourable Deputy Speaker, the list of deviant teachings that have been declared deviant by the Johor State Fatwa Committee is as follows:

1. Kardiani Teaching 2. Pertubuhan Bahin Teaching 3. Ilmu Tadlik, that is, Hakikat Insan Teaching 4. Gunung Ledang Tangkak Teaching 5. Ayah Pin Teaching 6. Taslim Teaching 7. Haji Banuar bin Roslan Teaching 8. Militia Ibrahim Teaching 9. Ilmu Makrifat Teaching 10. Zikir Nafas Rahmatan Lilalamin 11. Yayi Teaching 12. Histahrilk Ideology 13. Syiah Teaching

Finally, Honourable Deputy Speaker, I would like to thank all Members of the House who have given the best suggestions for my department. May we be granted long life to meet again. If there is a well in the field, allow us to bathe there; if we are blessed with long life, God willing, we will meet again to answer the call of the next sitting of the House. I support the motion for the development of the Belanjawan Johor 2021. Wabillahitaufik walhidayah wassalamualaikum warahmatullahi taala wabarakatuh.

Deputy SpeakerEN

The Honourable Chairman of the Committee on Education, Information, Heritage and Culture, please.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Assalamualaikum warahmatullahi wabarakatuh, peace and prosperity to Johor. Thank you, Honourable Mr Speaker, (Recitation of prayer). Honourable Madam Speaker, I would like to thank you for once again giving me the opportunity to deliver the winding-up speech in the debate session of the Third Meeting of the Third Session of the 14th Johor State Legislative Assembly. First of all, your humble servant would like to convey, with utmost respect, the highest congratulations and best wishes to Duli Yang Maha Mulia Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Negeri Johor Darul Ta'zim, on the occasion of the birthday celebration of Duli Yang Maha Mulia Tuanku on 22 November 2020, corresponding to 6 Rabiulakhir 1442 Hijrah. Your humble servant prays that Duli Yang Maha Mulia Tuanku and the entire Royal family will continue to be blessed and graced in presiding over the state of Johor with prosperity, well-being and harmony.

Honourable Madam Speaker, education plays an important role in achieving a quality life, because education is among the most important indicators of human quality of life. Education has a close relationship with knowledge, and knowledge is identified as a factor of output. Through education, intellectuals are born. This directly demonstrates the link between education and the development of a country. When intellectuals are born, the administration and management of the country can be run well, and these intellectuals are the ones who will bring honour to the country. Alhamdulillah, in the 2021 Federal Government Budget, the Ministry of Education Malaysia (KPM) was allocated RM50.4 billion for KPM's expenditure as the largest ministry, which amounts to approximately 15.6% of the total federal government expenditure. In this session of the House, which has been overshadowed by the COVID-19 pandemic, many questions have been raised by Members of the House who expressed concern over the fate of school and university students, especially those facing the SPM and STPM examinations. Personally, I admit that this has had some impact. Although the education sector is an organisation that falls primarily under the responsibility of the federal government, the Johor state government is very committed to making a success of a sustainable education agenda based on the Malaysia Education Development Plan in achieving the national education philosophy goals.

Therefore, students in the unique state of Johor have been exposed to various modules, including those that have been delivered in detail by the Honourable EXCO member of the Johor Islamic Sultanate (KIJ), which is managed by the Islamic Education Division, Johor Islamic Religious Department, and the Johor state government has also introduced the Johor Student Character Module (KRMJ), managed by the Johor State Education Department, which is incorporated into the academic field and is used to instil the core elements of the Rukun Negara and the Johor national identity. Therefore, the Johor government hopes that we can produce a Johor people of quality in terms of intellect, spirituality and physical well-being, in line with the national education philosophy.

Honourable Deputy Speaker, after the federal government announced the Conditional Movement Control Order (PKPB) in effect due to the COVID-19 pandemic, and Johor Bahru was declared a red zone, the Johor government, through the Johor Education Department, issued instructions and a letter to all Principals and Head Teachers regarding the implementation of Teaching and Learning from Home (PdPR) during the school closure under the PKPB, dated 9 November 2020, to ensure that teachers implement PdPR online or through other suitable mediums. This matter will continue until schools reopen next year. All primary school pupils and some secondary school students are to begin face-to-face school sessions by January 2021.

Honourable Deputy Speaker, the state government has also taken several initiatives to assist pupils, as proposed in the 2021 Budget, namely the provision of a one-off cash payment of RM100.00 to secondary school students, with an allocation of RM18.4 million. The COVID-19 pandemic has also prevented conventional learning, namely face-to-face learning, face to face, with permission, which we acknowledge is more effective. However, many initiatives have been carried out by the Ministry of Education Malaysia and the Johor State Education Department to implement teaching and learning online, or teaching and learning from home, through Education TV broadcast daily on TV channels, and Radio in Malaysia via TV1, TV2, TV Okey, NTV9 and Astro TV Tutor. Education TV broadcasts cover various aspects of primary and secondary schooling to address the deficit in internet connections and gadgets. The Johor State Education Department has produced 25 video recording slots of standard broadcasting for Education TV, with permission, for screening on TV Okey, RN and RTM channels, focusing on the public examination subjects SPM and STPM during the PKP period, and 18 slots have been successfully screened. There are many more modules and online alternatives that can be browsed, for example Google Classroom, which is very effective, and which was acknowledged by the Honourable Member for Paloh in his debate speech in the House yesterday. There are also many initiatives by Parent-Teacher Associations to finance online modules introduced by the private sector, such as Skor A, with permission. As a short-term alternative, the supply of Additional Reading Materials (PBT) provided by the Ministry of Education Malaysia, amounting to RM118,400.00, involving 50 primary schools and 96 titles of Malay and English language books, can be utilised by schools as loan reading materials for pupils for learning purposes without devices and Internet access, so that a learning deficit does not occur.

Honourable Deputy Speaker, the 1GB internet service provider, ISP, may I seek permission, data plan provided by the government through the Ministry of Education Malaysia until 31 December 2020 also helps pupils download materials supplied by teachers using applications such as WhatsApp, Telegram and Microsoft Gozella, which use low data compared with streaming pedagogy methods, may I seek permission. For students who possess devices, whether supplied or borrowed by parents, the Johor State Education Department has also provided an alternative for accessing online learning content through the digital learning gateway that can be accessed by teachers and pupils using the Delima ID provided by the Ministry of Education Malaysia at www.site.google.com/view/kiosk/KBDPDigital. In addition, the Johor State Education Department has also provided the YouTube initiative, Cikgutube Johor, which has more than 380 contents of selected subject videos produced by teachers of the state of Johor for self-learning content that can be accessed online and browsed via the link www.site.google.com/view/cikgutubejohor. Both of these initiatives can be accessed by students at any time, in the morning or after parents return from work, at Internet centres and so on. This initiative can also address the issue of the deficit in internet connections and gadgets experienced by most of the B40 group.

Honourable Deputy Speaker, the Johor state government, through the Johor State Education Department, has also acted proactively by encouraging schools to provide printed learning materials for distribution to pupils in various forms of modules based on the syllabus. In going through the Industrial Revolution 4.0, students dream of a learning ecosystem that is no longer limited to the classroom and face-to-face learning. Ideally, students should be able to study knowledge wherever they are, and educators should also be able to impart knowledge without having to be present in the classroom. The state government, through the Johor State Education Department, is also very committed to helping optimise the level of accessibility of Internet networks in rural areas through discussions with the Malaysian Communications and Multimedia Commission (SKMM). The discussions held aim to increase the widespread access of Internet networks in rural areas to fibre network or long term evolution network access, with permission, as well as to empower village or community Internet centres in rural areas and to expand the Johor Wifi facilities for Internet access. The notion that students cannot learn because schools are closed should not be used as a major excuse, especially in the Industrial Revolution 4.0, because there are various alternatives that use technology as a platform enabling the teaching and learning process to proceed without having to meet face to face. Cooperation between parents and teachers is also very important in monitoring and supporting students so that they continue to pursue knowledge, whether at school or at home. The state government also wishes to extend millions of thanks to all education workers who have worked tirelessly in continuing PdPR during this PKP, and you are also regarded as frontliners at this time.

Next, Honourable Member, I would like to add a little more. Since I took over as Chairman of the Education Committee, I have tried to help resolve teachers' problems, the most notable of which is the problem of teachers who are posted far from their spouses, known as "teachers in sorrow" who are posted far from their husbands and wives. And alhamdulillah, after discussions and meetings, many decisions have been made and now many have begun, and these teachers are able to serve close to their respective spouses. In the past, if one wanted to be promoted, for example, from Johor Bahru to become a Head Teacher, one had to leave Johor Bahru, but we have minimised this problem and we hope this matter will continue, and also in the interior areas, Honourable Member, especially in Orang Asli areas, the problem is that teachers have no quarters, namely government housing. And in these Orang Asli village areas, I see that teachers have no opportunity to rent houses in those villages. Therefore, I personally took the initiative of a pilot project in Kampung Peta with contributions from the KPRJ (Johor Rakyat Infrastructure Group) funds and also the Office of the Menteri Besar amounting to RM50,000.00, and also RM25,000.00 from the Member of Parliament, to build 2 quarters with the concept of gotong-royong, and while building, we also instilled the spirit of camaraderie and team building among teachers there, and alhamdulillah the project is now in progress, 50%.

I would next like to touch on the issue of Sekolah Menengah Kebangsaan Seri Jaya, which was mentioned by Parit Yaani, which still has not been completed since construction began in late 2013. For the information of the Honourable House, the Ministry of Education Malaysia has taken action to issue a notice of termination of the contractor's employment. The notice for the purpose of terminating the contractor's employment is still under review by the Legal Adviser, and the process of appointing a rescue contractor is expected to be completed in May 2021, and the school is expected to be fully operational beginning in early 2023. And after that, Parit Raja also expressed concern about the problem of repair of the structural building that has suffered damage at Sekolah Kebangsaan Parit Raja. This matter has been noted and has been forwarded to the Public Works Department for further action.

Honourable Speaker, I myself have made visits to all projects under the Ministry of Education Malaysia. In Malaysia, there are projects in the category of problematic projects, and I myself have chaired and been greatly assisted by government agencies to help resolve delayed problems. And alhamdulillah, after that, we have resolved many problems of schools that were experiencing such problems.

Next, I would like to touch on the problem raised by Endau regarding the need for additional national secondary schools. For the information of the Honourable Member, the need to build a school in an area takes into account population density, as well as the demand from the local community and the number of pupil enrolments in nearby schools. However, the approval for building a school in that area is subject to the current financial capacity of the government. The capacity of Sekolah Menengah Kebangsaan Hussien is still sufficient to accommodate the population density in the Endau State Legislative Assembly (DUN) seat.

And next, to overcome this coverage gap and to improve Internet coverage more effectively, various national-level programmes have been introduced, such as the National Fiberization and Connectivity Plan, formerly named NFCP and now rebranded as the National Digital Connectivity Plan (JENDELA), after the change of government, which will become the platform for improving the nation's digital communications. On 26 November last, the Menteri Besar of Johor announced the Johor Digital Agenda during the 2021 Budget speech. The Johor state government is very committed to developing digital economic activities. On 29 August last, the Prime Minister of Malaysia announced the JENDELA Action Plan, which will become the platform for improving the nation's digital communications under the Twelfth Malaysia Plan, 2021 to 2025. The JENDELA Action Plan was developed collectively by industry players and the government through the National Digital Infrastructure Laboratory sessions organised by SKMM from 13 July to 14 August 2020 to elevate the level of interconnectivity and the quality of communication experience and services throughout the country. The government, through the Malaysian Communications and Multimedia Commission, has been well aware of and has always been concerned about the coverage problem in rural or interior areas of the state of Johor as well as other states. Under the Universal Service Provision Programme (PPS) by SKMM, many communication infrastructures have been developed in rural areas in Johor, such as the development of 156 telecommunication towers, the upgrading of 506 existing towers to 3G and 4G services, the provision of more than 134,000 premises for fixed broadband access, the construction of 86 Internet centres with a human capacity-building programme, and others. The investment for the implementation of JENDELA in the state of Johor is estimated at RM2.5 billion, the majority of which will be through direct investment by industry players and the remainder through the government. The JENDELA Action Plan, which will be implemented in 2 phases, was developed collectively by industry players and the government based on national aspirations to achieve 100%, with permission, 4G coverage in populated areas at a speed of 100mbps, with permission, as well as fixed broadband access at a speed of 1,000 gigabytes, that is 1,000 megabytes per second, which will subsequently become a strong foundation for the transition to 5G technology.

In Phase 1 of JENDELA, the plan also involves the construction of 107 new communication towers and the upgrading of 393 communication transmitters on existing towers to 4G services under the Universal Service Provision Programme by SKMM. Meanwhile, an addition of 65 new towers and 1,960 communication transmitters on existing towers will be upgraded through direct investment. The JENDELA Action Plan is the effort of all parties, and its successful implementation requires cooperation from all parties, the federal government and state governments.

The Second Phase of JENDELA, which will begin from 2022 onwards, is the transition to 5G technology, which will follow after the platform implemented in Phase 1 has been strengthened. However, on 20 November 2020, the Minister of Communications and Multimedia Malaysia announced that the plan for Malaysia to begin using the 5G network this year has been postponed to give priority to the JENDELA plan, which originally had the 5G network scheduled to begin operating in Malaysia in the third quarter of 2020, but the changed government has changed the plan to fully complete the 4G network first before starting 5G. This is expected to be implemented at the end of 2022.

Among the reasons for the postponement by the ministry are several factors. First, the readiness of the people to use the 5G network. For the information of the Honourable House, 5G broadband requires more sophisticated smartphones such as the iPhone 12, Samsung Galaxy S20 and Huawei 40. Phones like the ones I use and that many of us, including the Honourable Member, use are not suitable for 5G coverage, and that is the reason. Second, regarding the problem of regulation and the subsequent gap in charges between 4G and 5G.

Honourable Madam Speaker, the Honourable Member for Perling raised the matter of the Internet of Things (IoT). The State Secretary of Johor, the Science, Technology and ICT Division, is responsible for the development and operation of all forms of ICT infrastructure and initiatives for the government and for government services to the people. This division also has a role in developing ICT competency among the state civil servants of Johor. This division is also not left behind in utilising IR 4.0 technology for the use of the state government. The development of IoT technology has been adapted in the monitoring of the Government Data Centre. The Data Centre, which operates 24 hours a day, 365 days a year, without stopping, is monitored using IoT technology in the Environmental Monitoring System (EMS). The Environmental Monitoring System will send information relating to the data centre's temperature and humidity. Apart from IoT, this division also uses other Industrial Revolution 4.0 (IR 4.0) technologies in the implementation of ICT for the Johor state government.

Among them is the use of private cloud computing, known as cloud computing, for the Data Centre and the Government Data Recovery Centre (DRC). This is to ensure that government electronic services are at a high level of availability. The state government will also be able to adapt Robotics Process Automation (RPA) technology, with permission, which is provided in the HRMIS application provided by the Public Service Department.

University students are the group expected one day to lead, drive and guide the people of the state of Johor towards economic, physical, spiritual and bodily well-being, directed towards excellence in prosperity for all. Therefore, the state government always allocates financial sums that are appropriate according to the overall income capacity of the state government. At the start of the COVID-19 outbreak, the state government channelled RM1.08 million in funds to 4,926 B40 family university students under the Johor State Caring Stimulus Package Scheme.

This programme was implemented in cooperation with the University Student Affairs Unit and the Johor State Students' Association at public and private higher learning institutions (IPTA and IPTS) in Johor. Recently, the Most Honourable Menteri Besar agreed, through his existing allocation, to add another RM1 million to 500 university students through the same method of delivery and implementation, which amounts to approximately RM200.00 per student. In the 2021 Budget tabled by the Most Honourable Menteri Besar, the government continues to channel higher education loans amounting to RM14.7 million, RM300,000.00 for the Sultan Ibrahim Scholarship, RM150,000.00 for the PDT Masters Education Fund, RM500,000.00 to the Johor Students' Association, and RM500,000.00 for the Johor Student Ambassador Programme.

To uphold the heritage and culture of the state of Johor, which is rich in history, civilisation, including arts and culture, the Most Honourable Menteri Besar launched a Johor Master Plan as an International Malay Civilisation Centre for 2020 to 2024, a 5-year period, on 8 October 2020 at the Sultan Abu Bakar Heritage Complex. The master plan for these 5 years has 9 strategic pillars, namely, 4 Basic Strategic Pillars, which are the Islamic Institution and Johor Malay Sultanate, Johor Malay Leadership, Johor Cultural Heritage, and Johor Malay Language and Literature. The other 5 are driving strategic pillars, namely Malay Economy, Heritage and Cultural Tourism, Education and Public Reform, and Digital Heritage Library and Political Commitment. The combination of the Basic Strategic Pillars and the Driving Strategic Pillars is capable of bringing the state of Johor to become a state that has long-term policies and action plans to uphold Malay civilisation and elevate it to an international level. To make the implementation of this master plan more high-impact and to ensure its precision in line with Johor's aspiration to become an International Civilisation Centre, a branded project concept has been introduced.

Deputy SpeakerEN

Two more minutes, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Branded project means a project within a complete ecosystem that aims to uplift one aspect of the Johor Malay Civilisation through a special project that can be implemented in the short and medium term. A branded project must have a main driver representing the relevant government agency and be supported by several public, private and non-governmental agencies. 12 Branded Projects were introduced, namely Kampung Tradisi Tamadun Melayu Johor, Kota Budaya Berkembar, Johor Kreatif, Johorpedia, Zapin Johor, Digital Warisan Johor, Galeri Seni Muzium Daerah, Kursi Tamadun Melayu Johor, Intelek Awam Johor, Sarjana Johor, Budirelawan Dan Warisan Alami Johor. The impact of the COVID-19 pandemic that struck the state this year led to several idea approaches being developed to continue the sustainability of arts and cultural activities, adapted to the SOPs outlined by the National Security Council.

Most activities have been adapted to online methods through Facebook, Instagram and YouTube. Some of the best examples are the Original Song Singing Competition, the Johor Traditional Costume Modelling Competition, the Johor Heritage Serving Programme and the Johor Zapin Dance Short Video Competition. Related seminars and courses also had to be held in very small groups. All these initiatives illustrate that the state government's efforts to empower heritage and culture have not stopped, even when facing new challenges that are very different and beyond expectation.

Before I conclude my winding-up today, Honourable Speaker, I would first like to record my sincere and heartfelt thanks to all the frontliners of the nation who have sacrificed their time and lives to keep us safe from the threat of COVID-19. Honourable Madam Speaker, as for pantun lovers, I too want to just give a short pantun. Don't sing, lah, singing won't sell later, it's already raining. Birds fly to Kuala Sedili, if nominated, win, we'll meet again. That is all. I conclude my winding-up with wabillahi taufiq walhidayah. Assalammualaikum warahmatullahi wabarakatuh.

Deputy SpeakerEN

Honourable Members, the Honourable Chairman of the Committee on Agriculture, Agro-based Industry and Rural Development, and also the Right Honourable Menteri Besar, will deliver the winding-up on Sunday, 6 December 2020.

I hereby adjourn this sitting until Sunday, 6 December 2020 at 9.30 am.

The sitting was adjourned at 5.08 pm.