Announcement from the Honourable Mr Speaker.
In the name of Allah, the Most Gracious, the Most Merciful. Peace and the mercy and blessings of Allah be upon you, and greetings of peace. (Recitation of selawat). Praise be to Allah that we are on the seventh day of the Third Meeting (Budget 2021) of the Third Session of the 14th Johor State Legislative Assembly (Dewan Negeri Johor).
Oral QuestionsQuestions
Honourable Parit Yaani, please.
Peace be upon you. Thank you, Mr Speaker, my question is Question No. 1.
Referring to the recent economic crisis, it cannot be denied that the economic sector in the State of Johor has also been affected, especially small traders across the State of Johor. To what extent is Perbadanan Usahawan Johor Sdn Bhd (PUJB) playing a role in helping small and medium enterprises (PKS) in the State of Johor?
Please, Honourable EXCO Member.
Peace be upon you, in the name of Allah, the Most Gracious, the Most Merciful. Thank you, Mr Speaker, and Honourable Parit Yaani. The Johor State Entrepreneur Development Corporation (PUJB), as the main implementing agency for entrepreneur development efforts in the State of Johor, has always taken proactive and holistic measures in providing assistance, training and guidance to help micro-entrepreneurs and PKS in this state. Among the initiatives that have been implemented by PUJB Sdn Bhd are the following, beginning with e-Bazar Makmur Johor, Hari Bertemu Pelanggan, Geran Orang Lokal, the 3P Programme, namely the Food Truck Grant, Program Latihan Usahawan Johor, PUJB Business Talk via FB PUJB, Johor e-Market Place, Pusat Data dan Aplikasi Holistik Digital Negeri Johor, Misi Jejak PKS Johor, Projek Pembangunan Ekonomi Komuniti, Anugerah Keusahawanan Johor, Program Pemasaran Usahawan Johor, Padanan Perniagaan, X-Cross Usahawan Johor and others. So, as I mentioned just now, some have been completed, some are ongoing, in progress, and there are also some that we will implement. Thank you.
Yes, Parit Yaani, supplementary question.
Thank you to the Honourable Speaker. My supplementary question is based on the economic crisis which, as we are well aware, has caused many SMEs or small entrepreneurs and small hawkers to close their businesses. I would like to obtain information on how many small traders recorded under the PKS database, and also those under the PUJB database, have closed their businesses. And how many staff are involved, and what forms of assistance, other than those already mentioned, are there to ensure that those involved, who have been made redundant or suddenly dismissed, are able to support their families, because we are well aware that among those affected who have become homeless today are those who lost their jobs due to COVID and also due to sudden terminations. Thank you.
Please, Honourable EXCO Member.
Thank you, Mr Speaker, and Parit Yaani. The question just now referred to small and medium traders, all of whom are within the PKS category. There are also situations where some companies are registered and some are not registered. So, we do not have data on unregistered companies.
For the information of the Honourable Parit Yaani, the number of companies that closed, namely sole proprietorships, partnerships and small traders, from March to October was 2,520, which is in our records, obtained from SSM (Companies Commission of Malaysia). The district with the highest number was Johor Bahru with 1,215. As for new company registrations, the number of new company registrations is much higher, much greater than those that closed, at 59,000 in the State of Johor, including those I mentioned just now, namely sole proprietorships, partnerships and private limited companies. So, during the COVID-19 pandemic, we have succeeded in bringing them in and guiding them through the assistance we have given, and the growth in the number of companies successfully established is very good. So, this is not a regularisation process, but it shows the effectiveness of the efforts carried out by PUJB.
So, for the small unregistered traders that I mentioned on the earlier occasion, we will take an approach with the EXCO for KPKT (Ministry of Housing and Local Government (KPKT)), PBT, and I have also discussed this with them, to regularise them. Regularising them in the sense that we do not want to use enforcement to clear them out; we want to legitimise them. Firstly, we will ask for some leniency to give them a little time in the current situation until the near future, and they will be registered and will be given a place to trade. This is the only way we can help them to make a living, so that they are not marginalised, and by doing so we can also reduce the number of unlicensed hawkers on the roadside. Thank you.
Yes, Kota Iskandar, supplementary question.
Thank you, Honourable Speaker, and thank you to the EXCO for the answer given. As we know, the PKS industry makes a major and significant contribution to the country's GDP, and from the budget, we were told that the government has allocated, as presented by the Honourable Menteri Besar, including a loan of RM100 million, Local Grant of RM3 million and others. My question is, following the resolution of the Ibrahim Johor Economic Council (Majlis Ekonomi Ibrahim Johor) or IJEC, it was proposed that the state government apply for assistance of RM1 billion to drive the PKS industry and also the manufacturing sector. To what extent has this application been considered by the federal government?
Please, Honourable EXCO Member.
Thank you for that question. For the Honourable Member's information, indeed the state government is making efforts to obtain PENJANA assistance from the federal government. We also recently held a meeting with the Minister, the Minister together with a delegation from financial institutions as well as TEKUN and Bank Rakyat, and we presented and expressed what we need and what amount we need in order to
help traders and PKS in the State of Johor. And among the matters we touched on was the role of Bank Rakyat, which, thankfully, has provided an allocation of RM100 million to assist the state and provide loans to PKS in the State of Johor. And this matter is, the discussion is almost complete, only its mechanism is yet to be detailed, and we are also looking at the cost of funds, its spread, margin of financing, and such matters, and we take into account the loan tenure so that it does not burden borrowers, and we hope that borrowers will also be given facilities, facilities with the support of Credit Guarantee Corporation so that there is less bureaucracy. So, this matter can be implemented in the near future. God willing, thank you.
Next question, I invite the Honourable Johor Lama.
Peace be upon you, Mr Speaker, Question No. 2.
I urge the state government to help traders at flea markets, night markets, bazaars and the like who have been severely affected by COVID-19. I request that compensation or other alternatives be provided so that traders can continue to survive.
Please, the Honourable Parit Raja. Pasir Raja, sorry, I apologise.
Peace be upon you, Mr Speaker, my question is Question No. 3.
Is the state government considering establishing a second-round initiative to help small traders, especially those affected by the PKPB this time?
Please, Honourable EXCO Member.
Peace be upon you, in the name of Allah, the Most Gracious, the Most Merciful, greetings of peace, greetings of prosperity for Johor. Mr Speaker, thank you to the Honourable Johor Lama and the Honourable Pasir Raja for the questions, let me answer them together. The question focuses more on what assistance, automatic compensation, and second-round initiatives are available to night market traders, morning market traders, small traders or IKS traders.
Mr Speaker, starting this year, 2020, when the COVID-19 pandemic occurred, the state government has provided incentives, licence and premises exemptions throughout 2020, involving 57,250 traders, with a financial implication of RM13,078,765.00. For next year, as emphasised by the Honourable Menteri Besar in the presentation of the 2021 Budget, several one-off assistance incentives will be provided to small traders who we clearly know are in difficulty and hardship facing the COVID-19 pandemic.
For the information of this honourable House, next year there will be licence exemptions for hawkers, PKS traders and others. If I may briefly read out, Mr Speaker, there are 24,616 hawkers across Johor and 11,149 PKS traders; the total of both is 35,765. This licence exemption will have an implication and loss of revenue of RM51 million. For premises whose rent is exempted, there are 6,364 PBT premises, involving a loss of revenue or implication of RM8.2 million, public markets, 4,328, financial implication or loss of revenue of RM2.7 million, morning markets 5,858 involving loss of revenue...
A bit more spirit, Honourable Member.
RM1.058 juta.
Honourable Member, a bit more spirit.
Pasar malam..
Rengit is always spirited, but today he is just slow. Is there a problem, Honourable Member? (House laughs).
No, otherwise I'll be told off by the Speaker for going on too long. I took the highway, I thought today I'd take the city road. (House laughs).
It's not a matter of length, it's a matter of a bit more spirit.
Ok, 29,800, 29,017 people involving a loss of revenue of RM3.1 million, Honourable Member. So, the financial implication is approximately RM15 million, revenue RM5 million, approximately RM21 million. And the second incentive announced by the Honourable Menteri Besar in terms of one-off assistance to these traders, Honourable Member, is that each person will receive RM500.00 even if they trade at night markets. I give an example: the Parit Sulong night market, the Semerah night market, the Batu Pahat night market, they can only receive the one-off assistance once. If counted once, it may be a lot, possibly RM3,000.00. For this, we give this one-off assistance only once. Among other measures, Mr Speaker, that we will take to help and ensure that these traders can be assisted in this time of hardship, is including those who do not yet have licences, Honourable Member. We will provide stall space facilities to small traders and food trucks. I have discussed with all YDPs to request facilities for all these traders, including traders who have licences and those who do not have licences, to trade in areas of stalls that we can think of as able to help. But do not cause traffic congestion. Because this is necessary, this situation requires us to help.
We will take, we have discussed with the Council, and God willing, we will give licences to traders who do not yet have these licences promptly within one day. And God willing, I will monitor this matter.
And one more important thing: permitting stalls in front of our homes for affected traders who have lost their jobs to set up their stalls in front of the house, but on condition that they do not disrupt traffic, that is the most important. And after trading, the stalls must be removed. We do not want, after trading, stalls scattered everywhere, that we do not want, Honourable Member. So, in any case, in this matter we are trying to help traders, and God willing, the Johor state government will always be committed to efforts to help small traders and PKS traders in facing the COVID-19 pandemic. Mr Speaker, that is the answer I can give.
Ha, that's the real Rengit. Please, supplementary question.
Thank you, Mr Speaker, for my supplementary question. To prevent other parties from taking advantage of these special programmes, we see they are too widespread and extensive and it appears that it will eventually happen without control, especially for flea market traders and small traders. Does the local authority (PBT) or the Council have a planned mechanism to prevent these matters from occurring
and who should monitor or assist the Council? Thank you, Mr Speaker.
Please, Honourable EXCO Member.
Mr Speaker, in the current challenging COVID pandemic situation, although traders are trading, many people do not come, Honourable Member. This is as an encouragement for them to extend their trading hours. If night markets or morning markets are restricted, we can allow them to trade as I mentioned. The main objective is that they can extend their trading hours to obtain additional income. The main condition, the most important, is that they must maintain the cleanliness of the site. Secondly, they must ensure road traffic safety. Those are two important matters in determining how we allocate trading spaces to them.
The mechanism that the local authorities (PBT) will mention is that they will work together with associations and perhaps Members of Parliament who can help in this matter, so that those we see in truly distressed, desperate or hardship situations are helped. What I mean is, PBT, associations and also Members of Parliament can help, and perhaps we will set up a committee at PBT level to organise and monitor, plan, arrange and also monitor the programme I mentioned earlier, Mr Speaker.
Yes, Pasir Raja, supplementary question.
My supplementary question is, what is the role of KPDNHEP (Ministry of Domestic Trade and Consumer Affairs) in helping traders, hawkers and consumers during the COVID-19 phase, and to what extent is KPDNHEP playing its role? Thank you.
Please, Honourable EXCO Member.
May I answer on behalf of KPDNHEP?
Boleh YB.
That's fine, thank you to Pasir Raja. I think, God willing Mr Speaker, we will ensure these efforts can be coordinated with KPDNHEP, more or less that is how it sounds, if I've mispronounced it, forgive me. What is important is in terms of price control, quality of goods and also price control. I will discuss with the Chairman of the Consumer Affairs Committee to look into this matter so that traders can sell goods at the proper prices, recipients can receive, and buy goods of good, controlled quality. Thank you.
Yes, Buluh Kasap, please, supplementary question.
Thank you, Mr Speaker. I just want to draw attention to stalls trading on the roadside or within JKR (Public Works Department) reserves. Recently, the Council has not issued licences to traders who trade on the roadside, even though they had traded for a long time before, on condition that they obtain written permission from JKR. So, my question is, is the statement just now by the Honourable EXCO, which
provides facilities or licence exemptions to these traders, including those who previously traded in road reserve areas? Thank you.
Please, Honourable EXCO Member.
Mr Speaker, we divide roadside traders into two: one that is permanent, which builds permanent structures, or semi-permanent. What we encourage are those who only set up tables and umbrellas, that is acceptable, but for permanent ones, in terms of regulations, we must look at the JKR reserve area, and usually we will refer to JKR to obtain certainty on whether this area can be used. But what we want to say is, we want to encourage these traders to trade on the roadside, without disrupting traffic and without affecting cleanliness, yes, we can give licences but the condition is that there are no permanent or semi-permanent buildings. Yes, that is what I meant in the programme where we will give leniency to traders in PBT areas in the State of Johor, Mr Speaker.
Next question, Honourable Pekan Nanas, please.
Mr Speaker, my question is Question No. 4.
What steps have been taken by the state government to encourage oil palm smallholders to apply for MSPO certification?
Please, Honourable EXCO Member.
Assalamualaikum warahmatullahi wabarakatuh, greetings of peace and prosperity to Johor. Honourable Mr Speaker, sustainability at this time is one of the important aspects that must be emphasised in the development of any industry. In view of this importance, every product that is produced must be produced sustainably so that it can be accepted at all levels of the world. Unsustainable agricultural practices are also important for the continuity of the productivity of the agricultural ecosystem. For example, oil palm is the largest agricultural commodity in Malaysia and it must be produced sustainably to ensure acceptance by the world market. Therefore, the palm oil industry at this time has cooperated in establishing various standards that contain elements of sustainability.
Accordingly, the Malaysian Palm Oil Board (MPOB) has been tasked with formulating a standard to be gazetted as a Malaysian standard, or MS. This standard is named Minyak Sawit Mampan Malaysia or Malaysian Sustainable Palm Oil (MSPO), and MSPO was developed together with the national palm oil community, sustainability experts and SIRIM Berhad. The MSPO standard was gazetted on 5 September 2013. In connection with that, all palm oil producers in Malaysia, covering the milling, plantation and smallholder sectors, must be certified under the MSPO Certification Scheme.
Various steps have been taken by MPOB to ensure that all smallholders apply for and subsequently obtain MSPO certification. Among the steps taken is to intensify efforts to engage smallholders through the implementation of training programmes and MSPO briefings in all districts in the state of Johor. This is entrusted to MPOB offices at the branches in the districts, and in every mukim there is an MPOB Pegawai Tunas or MPOB mini-ambassador whose role is to provide advisory services to smallholders, and there are 86 MPOB Pegawai Tunas throughout the state of Johor.
Through the MSPO training programmes, smallholders will be given clearer explanations of the MSPO requirements and will subsequently register with MPOB to implement MSPO. To ensure that smallholders receive sufficient information to comply with the requirements contained in MSPO, MPOB works closely with various other departments and agencies such as the Department of Wildlife and National Parks (PERHILITAN), the Department of Agriculture, the Department of Environment, the Department of Occupational Safety and Health, and the Johor State Land and Mines Office in providing explanations to smallholders in every training session organised by MPOB. Cooperation with agencies such as FELDA, RISDA and FELCRA has also been arranged specifically for organised smallholders, or PKT, under those agencies.
In complying with the requirements contained in MSPO, smallholders face various difficulties in implementing MSPO, especially issues relating to the land's express conditions. Therefore, MPOB works closely with the Johor Land and Mines Office in assisting affected smallholders to facilitate their obtaining of conversion of the land's express conditions. For this purpose, the Johor state government previously provided various initiatives such as Approval Over Submission or AOS and a reduction of the compound payment rate of up to 50% to attract smallholders to register for MSPO. And at the same time comply with the National Land Code 1965 Act. Furthermore, as announced in the Johor Budget 2021 by the Honourable Menteri Besar of Johor, the government will implement an initiative to reduce by 50% the penalty for changing conditions through the Approval Over Submission regularisation programme for agriculture, to be implemented from 1 January 2021 to 31 March 2021. A total of 16,857 smallholders will benefit from a reduction in penalties amounting to RM8.2 million from the state government.
This initiative can help farmers who cultivate land below 10 acres to obtain a Malaysian Palm Oil Board (MPOB) licence and Malaysian Sustainable Palm Oil (MSPO) certification. To encourage smallholders to obtain MSPO, the government has provided special MSPO incentives for smallholders to meet the costs of implementing MSPO certification. For private smallholders, the cost of MSPO certification is free and fully borne by the government at a rate of RM135.00 per hectare. For the state of Johor, the government has borne a total of RM3.2 million to cover this cost. The incentives provided by the government cover funding for the cost of MSPO-related training, auditing costs, the cost of chemical storage racks, the cost of personal protective equipment (PPE) and the cost of converting the land's express conditions. For organised smallholders, an incentive of RM55.00 per hectare is provided by the government to implement MSPO on their plantations.
The government is deeply committed to ensuring that all oil palm operators in Malaysia, including smallholders, are certified under MSPO. Therefore, the government is launching an integrated mandatory MSPO promotion programme specifically for smallholders through the mass media and also social media throughout the country. That is all, thank you.
Yes, Pekan Nanas, please go ahead.
Honourable Mr Speaker, the compounding action against oil palm operators who have not applied for MSPO will begin on 1 July 2021, and from January 2022 operators who have not started MSPO certification will be subject to licence suspension and will not be allowed to sell their produce. Therefore, we find that changing the conditions for use of oil palm plantations is mandatory and increasingly urgent according to government policy compared with other crops
. For this reason, Pekan Nanas welcomes the government's effort to reduce the conversion penalty by 50% for landowners who convert land, but since...
Honourable Member's question, please ask.
The need to change conditions in the field of oil palm smallholders. My question is, is the government or the Department of Agriculture prepared to negotiate again with the Land Office to apply for the waiver of all penalties that will arise when changing land conditions to oil palm, given that the need to change land conditions to oil palm is increasingly urgent and, minta tarif.
Please, YB EXCO.
Honourable Mr Speaker, the intention to certify oil palm plantation operators and their oil palm produce with the MSPO certificate is for the good of the operators and the palm oil industry itself. The problem we have found is that the response from operators not to register and not to pursue this registration is not solely because of penalties. Rather, it is the perception and the lack of follow-up by the parties concerned. Therefore, the state government has provided facilities for 50%, and moreover I would like to inform, I was informed by the PTG Negeri Johor division. Conversion of conditions is encouraged for crops on land at this time, because we want them to cultivate as stated in the express conditions in the title. So in this matter, Honourable Mr Speaker, what is important is the awareness of operators, which is why the government is taking initiatives through organisation to organisation, its LPP, their smallholders' associations, to ensure these operators continue to strive to obtain MSPO certificates, and at the same time, as Honourable Mr Speaker and Members of the House are aware, the MSPO certification requirement is very important for the sustainability of this industry. Therefore, in this matter, up to now there is no intention to abolish the 50% penalty. Thank you.
Next question. Honourable Johor Jaya.
Honourable Mr Speaker, my question is number 5.
Can the government allow Malaysian students studying in Singapore, especially those aged 12 and below, to be quarantined at home after their swab test results come back negative?
Please, YB EXCO.
Thank you, Honourable Speaker. The Home Surveillance Order has been enforced under the Prevention and Control of Infectious Diseases Act 1988 (Act 342) on 10 June 2020. However, starting 24 July 2020, quarantine orders at quarantine stations have been re-enforced by the government due to non-compliance by PUS with the Home Surveillance Order that had already been issued. Therefore, starting 24 July, all travellers arriving at international entry points are required to undergo 14 days of quarantine at quarantine stations designated by the government. Thank you.
Yes, Johor Jaya, please go ahead. Supplementary question.
Honourable Mr Speaker, my original question concerns those, namely students who study in Singapore, whether they can be allowed home quarantine, because as we know, for those aged 12 and below, they may not be able to quarantine at the quarantine station and their parents are very worried about their safety if they are alone at the quarantine centre. And my supplementary question is, that was my original question, and my supplementary question is, as we know, for Malaysian citizens who hold work permits, they can return to Malaysia through the PCA programme. However, for those who are SPR Singapore, whose PR is also Malaysian citizens, they cannot enjoy this facility. So, is there a plan by the government for these SPR holders to also be able to return to Malaysia through this PCA programme, because some feel it is unfair that they cannot enjoy this programme. And apart from that, are there any categories, any categories in which they are allowed or exempted from quarantine, for example, pregnant women or those who have depression. Thank you.
Please, YB EXCO.
In fact this is three questions in one. Never mind, that is for the Honourable Johor Jaya. Honourable Speaker, as I said earlier, in principle there is no Home Surveillance Order whether for children or adults. But usually under the general rule there are exemptions, exemptions or general rules. So, when in certain categories there is a need for home surveillance, then any application for home quarantine can be submitted. And it must be emailed to the Ministry of Health Malaysia. Perhaps I can state the email address for the Honourable Johor Jaya, which is [email protected], I repeat [email protected], together with the relevant documents and evidence for further consideration by the Director-General of Health Malaysia. So, in the context of a 12-year-old student or under-age, for example, who travels alone to enter our country, parents or guardians may submit the application to the email I have mentioned and it will be considered by the government.
Honourable Speaker, there are indeed certain cases where we grant exemptions from home surveillance, for example for those who have chronic illnesses. When we can prove that a person has depression or epilepsy, for example, and where this would make it difficult for that person to stay alone in a quarantine centre, then in such cases an application can be made. Likewise for the category of pregnant mothers or mothers after childbirth entering our country, they too may make an application and it will be considered as I said earlier, case by case, case basis, and such persons have previously received exemptions. Likewise, when a child, a minor, wishes to enter our country, parents or guardians may also offer to accompany the child in the quarantine centre. They offer themselves to stay in the quarantine centre if the child does not get a home surveillance exemption. In cases like these, an application can also be made for parents to offer themselves to accompany their child in that quarantine centre. And in such cases there will be a charge that will be imposed on the parents.
Honourable Speaker, regarding the questions relating to RGL and PCA that were raised by the Honourable Johor Jaya, namely the Periodic Commuting Arrangement and the Reciprocal Green Lane. For the information of the honourable Members of this House, this programme began on 14 August 2020. And, for the information of this House, from that date until 5 December, a total of 15,009 people have entered our country using the PCA, Periodic Commuting Arrangement, and from 14 August until 5 December, a total of 2,541 people have used the Reciprocal Green Lane (RGL) to enter our country. So, under RGL so far there have been no positive cases, but under PCA, to date we have detected 3 positive cases. So, for the information of this honourable House, the PCA and RGL programmes are the subject of discussion between the government and the Government of Singapore. So when they set this PCA policy, many found it strange, but what actually happened is that only those with work permits, only work permits qualify them to apply under this PCA category. So, in this context, even if they have a work permit, if they are Singapore PRs, this does not qualify them to apply. As I said earlier, we have indeed received many requests and applications, especially from Malaysians working in Singapore, but they are not on work permits, they are PRs. So at this time, the government has also held several meetings, and we are considering allowing those with work permits to also be permitted to enter under this PCA programme, but there is no decision yet. However, I think a good decision will be reached in a short while. Thank you.
Honourable Mr Speaker.
Yes, Stulang, please go ahead.
Thank you, YB EXCO. As we are well aware, exemptions for the cases raised by YB EXCO are on a case-by-case basis. So what we emphasise here is that in fact many Malaysians, many Malaysians who have already been in Singapore for more than 90 days. For the PCA category, those who have already been in Singapore for 90 days may return to Malaysia without undergoing quarantine at the quarantine centre. So, there are already many Malaysians who have been in Singapore for more than 90 days. Then Singapore is now an area or country with low risk, so many have requested that policy be made from the KKM level, the federal level, to continue to provide relaxation so that those returning from Singapore, whether under PCA, Singapore permanent residents, long-term pass holders, student pass holders or social visit pass holders and so on who have been in Singapore for 90 days, when entering Malaysia, are permitted to quarantine at home. Thank you.
Please, YB EXCO.
Mr Speaker, thank you for the supplementary question from the Honourable Stulang. For the information of this august House, among the most aggressive advocates for opening the Malaysia–Singapore border is none other than our own Yang Amat Berhormat Menteri Besar. In every meeting with the federal level and so on, the Johor government has appealed, not only appealing for all applications to be made and also submitting certain SOPs so that the border between Malaysia and Singapore can be opened. But as I said earlier, this decision is not only at state level. Although at state level we indeed want it, yes, we do want the border between Malaysia and Singapore to be opened so that things will become as usual and so that our people who are stranded or have not returned for a long time can come back and so on.
And, in the health context too, we have already proposed various SOPs to the federal level. So, that is our stand actually, our stand. But as of now, with respect, as of now it is indeed as I said earlier, in the context of the PCA itself, when there are discussions between the Malaysian government and Singapore to introduce this kind of programme, more than 15,000 people have already entered Malaysia. Those who work in Singapore who could not meet their families have entered, those who have spent their leave with their families have returned and so on. So, this is between two countries. Between two countries, perhaps as the Honourable Stulang said just now, today the situation in Singapore is normal, but perhaps the view on the other side considers that the situation here may not be so normal. There are always new cases that arise and so on.
So, we must reassure both sides that when a situation arises in which both governments are confident that things are normal, and that people who enter the country and go back and forth are also safe and so on, then a situation will arise like the one proposed by the Honourable Stulang, that we will encourage more people to go out and come in. In fact, even in the current situation, the Yang Amat Berhormat Menteri Besar, through the state government, has also proposed DCA and so on, so that other categories are allowed to enter. But this also depends on the federal agencies, the foreign ministries, and the Ministry of Health of both countries to make a consideration. But I would like to assure Honourable Members that as far as the state government is concerned, we indeed aggressively advocate that things go back to normal, that the border can be opened, and that this will bring benefits not only in the context of community welfare but also in the economic context of both countries and the state. Thank you.
Honourable Member. Jementah.
Thank you, Mr Speaker, thank you to the Honourable EXCO regarding the answer given. In regard to this matter, I once made an application for a pregnant woman, about 7 months along, who has syncope attack symptoms that have been confirmed by, she lives in Singapore and has been confirmed by a doctor in Singapore, and she is also experiencing an unstable position of the baby. She applied to the HSO team, the HSO team, but it was rejected, and after I made an appeal on her behalf, it was also rejected. And, she will deliver in month 1. So, the question is, can the government consider for them, especially pregnant women who have difficulties because their husbands have to work and cannot accompany the pregnant woman back to Johor together? So, she has no other way. So, I ask the government whether they can consider, especially for pregnant women, if perhaps they are already about 6 months, 7 months pregnant and want to return to Johor, can they be exempted, can it be considered not case by case, perhaps considering them to undergo quarantine at home, can the government consider this matter?
Please, the Honourable EXCO.
Thank you, Mr Speaker.
Just like the Ministry of Health (KKM) lah. Please, please.
Actually, as I said earlier, for now it is case by case. There is no comprehensive policy stating that if a woman is pregnant, she can automatically be allowed, it is not like that, because each person's health condition is different. Some, although they are pregnant, are placed at quarantine stations and they are okay, but even though they are placed at quarantine stations, I would like to give assurance to Honourable Members that cases with something, such as pregnancy cases and
so on, if they have already been reported to the quarantine centre, the Ministry of Health, in the context of this Ministry's staff, will conduct more frequent visits to those with health problems and so on compared with normal people, and if there are any complications that arise while they are in quarantine, they will be immediately taken to hospital for further treatment, and this has happened before, this has happened before, it is not that because they are in quarantine, we just leave them alone.
So, if in the Honourable Member's case there are complicated cases that need attention, perhaps they can contact me directly, I am ready to help, and we will try to see how to help those with complications in the cases mentioned by the Honourable Member just now. Thank you.
The next question, the Honourable Parit Raja, please.
Assalammualaikum warahmatullahi wabarakatuh. Mr Speaker, question number 6.
Persons with disabilities (OKU) or the vulnerable are among those affected by this pandemic. Please state the role of the Yayasan Pembangunan Keluarga Darul Ta'zim in helping these groups so that they are able to generate income in the current new normal situation?
Please, the Honourable EXCO.
Bismillahirahmanirrahim. Assalamualaikum warahmatullahi wabaraktuh, greetings of peace, Johor Prosperity greetings. Thank you, Mr Speaker, thank you to the Honourable Parit Raja.
Mr Speaker, in answering the question from the Honourable Parit Raja, YPKDT takes seriously the needs of persons with disabilities in this state. YPKDT has established a division under the departmental organisation that focuses on the development of persons with disabilities, namely the OKU Development Unit. This unit acts to look after persons with disabilities in helping them generate income when these groups continue to be affected as a result of the COVID-19 pandemic.
For the year 2020, YPKDT has implemented the Training and Promotion Programme (PLP) for persons with disabilities. This initiative was implemented to help these groups be able to generate their own income by providing skills training in the field of food manufacturing, namely bakery and bahulu.
This year, a total of 50 OKU who have joined this PLP, involving various types of OKU. Of this number, 30 OKU have been identified as having potential in this field, and 15 OKU have successfully received equipment assistance to help improve further the quality of their existing products and thereby help ease and increase their income. YPDKT has also extended the proposal to implement the PLP programme for the year 2021, so that the benefits of this programme can be given to many more OKU in the state of Johor who have not had the opportunity to work but are still able to generate income with certain skills. Thank you.
Yes, Parit Raja, please proceed with the supplementary question.
Supplementary question. Thank you to the Honourable EXCO and congratulations on all the efforts and good initiatives from YPKDT. However,
I would like to know, is there the involvement of other agencies that provide programmes for OKU, and what programmes are being implemented for those who are also affected by this COVID-19 pandemic? Thank you.
Please, the Honourable EXCO.
Thank you, the Honourable Parit Raja. Apart from YPKDT, the state government through the Department of Social Welfare (JKM) also helps persons with disabilities. Among the programmes implemented, firstly, the Launch Grant Assistance at a maximum rate of RM3,000.00 at one time, assistance to eligible OKU who wish to start an enterprise or business, subject to the following conditions:
1. Citizens and residents of Malaysia, JKM's target group, not exceeding the poverty income line; any case in need may be considered with the approval of the Director-General of Social Welfare.
2. Disability Equality Training workshop, with respect, JKM Johor has implemented this workshop for employers, government and private agencies with the aim of raising awareness and understanding regarding disability and the barriers faced by OKU, especially when working with them. This workshop is to understand disability towards exclusivity.
3. Job Coach Service, that is to help OKU obtain employment and retain employment for at least a period of 6 months. In 2020, the Department of Social Welfare through the Job Coach Service has successfully secured employment for 23 OKU.
4. Independent Living Centre Establishment Programme, with respect, ILC. The establishment of ILC is to help OKU so that they can be self-reliant and able to carry out daily living activities without assistance or with minimal assistance, by providing 4 services, namely the Self-Reliance Training Programme, Personal Assistant, Peer Counselling, Information Support and Advocacy.
In 2020, the state of Johor established an ILC under the management of the Johor State Down Syndrome Association with federal government allocation of RM360,000.00 per year.
Thank you.
Yes, Johor Jaya, please.
Thank you, the Honourable EXCO, thank you, Mr Speaker. Mr Speaker, my supplementary question concerns one policy, namely 1% job opportunities in the civil service for Persons with Disabilities, namely OKU. My supplementary question is, how is this policy being implemented by the Johor state government?
Please, the Honourable EXCO.
For the information of the Honourable Johor Jaya, thank you. To answer that question, I would like to inform that, as I said earlier, we are based on the strengths or opportunities available to OKU, because it is guided by categories such as physical, mental, visual, hearing and also various others.
So, we, I always look at ensuring that what is launched is in accordance with the suitability of each OKU category. So, I hope that more, God willing, next year we will intensify the Job Coach service so that more of these people will be able to work. Thank you.
Yes, Buluh Kasap.
Thank you, Mr Speaker. I just want to raise the complaints from several OKU who previously received monthly contributions or allowances. But recently they have not received this assistance, and the reason given by JKM is that they have shown positive development. But when it comes to us OKU, what positive development is there? For example, I met one OKU whose leg was injured in an accident and is no longer balanced, 2 inches shorter, where is the development? So, what exactly are JKM's additional conditions or reasons for rejecting their applications? Thank you.
Please, the Honourable EXCO.
Thank you, the Honourable Member. To answer that question, actually every year the OKU or the monthly recipients from JKM must renew, what is it, renew each time, every year they must renew the issue or renew again what we say, to see, to identify whether they are eligible or not. Sometimes even though the Honourable Member just said, the leg is disabled, 2 inches shorter and so on, we also look at the needs or income of the family household. So, I also hope that, God willing next year, in the implementation of COMB, Find People in Need of Assistance, God willing, we will be better able to meet all the needs required by the community out there. Thank you.
Ok, the next question, the Honourable Pasir Raja, please.
Mr Speaker, my question is number 7.
Throughout the challenges of COVID-19, has the Islamic Religious Department conducted a review of eligibility criteria for applying for Baitulmal?
Please, the Honourable EXCO.
Bismillahirahmanirrahim Assalamualaikum warahmatullahi taala wabaraktuh. Mr Speaker and the Honourable Pasir Raja, the Majlis Agama Islam Negeri Johor has a guideline in determining whether a person qualifies as fakir miskin (poor and needy) or not, called the Garis Panduan Had Al Kifayah or the individual sufficiency rate. Throughout the period of facing the COVID-19 challenge, the Majlis Agama Islam Negeri Johor has not lagged behind in channelling assistance to those affected by COVID-19. For the time being, there is no review to determine eligibility for assistance applications; the Majlis Agama Islam Negeri Johor continues to use the existing guideline, namely Had Al Kifayah, in determining the eligibility of assistance applicants. I thank the Honourable Member for this suggestion, and God willing, I will bring it to the Baitulmal Division and the Finance and General Affairs Committee of the Majlis Agama Islam Negeri Johor to re-evaluate the rates and methods of assistance for those applying for Baitulmal assistance, because now our poverty rate has changed, Mr Speaker, previously it was RM900.00, now the poverty rate for the state of Johor is RM2,005.00.
God willing, I will bring this matter to the Baitulmal Assistance Division of the State of Johor. Thank you.
Yes, Pasir Raja.
Thank you, the Honourable EXCO, for the answer. What I want to raise is my question, how does the Islamic Religious Department ensure that an applicant is truly eligible, and who is responsible for ensuring that person is eligible, because now during this COVID season, too many people say they are eligible but in reality everyone wants assistance. So, does the Islamic Religious Department office deploy several people to identify whether the applicant is eligible or not? Thank you.
Please, the Honourable EXCO.
Thank you, the Honourable Member. For the information of the Honourable Member, the officer who should receive and manage assistance at district level is the Amil Officer at district level. Now we have Amil Officers at district level in all districts in the state of Johor. However, for the information of Mr Speaker and also Honourable Members, during this COVID-19 period, the Department, the Majlis Agama Islam Negeri Johor, has not lagged behind in channelling assistance to those affected by COVID-19.
For example, cash assistance of RM1,000.00 to individuals confirmed positive for COVID-19. The number of recipients is 200 persons and the amount is RM200,000.00. Cash assistance to 1,000 persons, cash assistance of RM1,000.00 each to the family or heirs of COVID-19 patients who passed away. The total so far is 10 recipients, amounting to RM10,000.00. Assistance in basic food necessities of RM100.00 for each household for families who have lost daily income or whose wages have not been paid, the number of recipients is 20,000 persons and the amount of payment is RM2 million. Cash assistance of RM100.00 each to recipients of living allowance and medical assistance as well as converts of the Majlis Agama Islam Negeri Johor, 25,000 recipients totalling RM2,500,000.00. Basic necessities assistance totalling RM100.00 for each household to the entire Orang Asli community across the whole state of Johor, 4,280 recipients amounting to RM428,000.00. Johor Ihsan one-off assistance of RM500.00 to small asnaf traders under the supervision of the Majlis Agama Islam Negeri Johor, totalling 200 recipients, amounting to RM100,000.00. Basic necessities assistance for students who live in hostels, in madrasahs registered with the Majlis Agama Islam Negeri Johor, RM100.00, 300 recipients totalling RM30,000.00. Cash assistance of RM200.00 each to students from the state of Johor who are pursuing studies in Egypt and affected by the PKP overseas, 780 recipients totalling RM157,000.00. Cash assistance of RM300.00 each to students from the state of Johor who are pursuing studies in Jordan and affected by the PKP overseas, 70 recipients totalling RM21,000.00. Contributions for the use of medical and non-medical assets and other needs to tackle COVID-19 through the Johor State Health Department at all hospitals involved, amounting to RM6,000.00. All the hospitals involved, we have contributed a total of RM600,000.00.
Are there many more, Honourable Member?
Only two more. Basic necessities assistance totalling RM100.00 for each household for those with the status of Persons with Disabilities (OKU) across the whole state of Johor, 200 recipients, RM20,000.00.
Cash assistance of RM100.00 was channelled to recipients of living allowance and medical assistance, totalling 19,515 recipients, RM1,955,100.00.
And finally, Mr Speaker, special assistance of non-food daily necessities such as disposable diapers, milk and others to residents of Kampung Parit Ibrahim Majid who were placed under the Enhanced Movement Control Order (PKPD), 822 recipients totalling RM35,000.00. The Honourable Member may channel directly to me if there are matters related to problems regarding this assistance. Thank you, Mr Speaker.
Yes, Semerah, please.
Thank you, Mr Speaker. The Honourable EXCO, the Baitulmal has provided many incentives. My question is how long does it take for each application, and how long is taken for each application that has been approved...
The Honourable Member is referring to that question, Honourable Member...
Ya soalan..
This is actually about this study.
It should be a challenge. Has the Islamic Affairs Department reviewed eligibility for applications? True, he is eligible to apply, but once he has applied we want to know how long it takes. Time matters when there are many applications, so here we want to ask: how long does it take to approve an application, and how long does it take to make payment after approval? Thank you.
Honourable EXCO, please.
Thank you, Honourable Semerah. As I announced, under the new methods and procedures I have issued, I have instructed all officers of the Johor Islamic Religious Council (MAIJ) district offices that applicants whose applications are sent to the MAIJ district offices must be given a reply within 14 to 21 days, Mr Speaker. Thank you.
The next question. Honourable Kemelah, please.
Thank you, Mr Speaker. My question is Question No. 8.
What is the percentage coverage of Internet access by mukim in the state of Johor, by category of wired and wireless, up to now? What efforts are the state government making, with the cooperation of the federal government, to expand coverage and increase access speeds?
Honourable EXCO, please.
Assalamualaikum warahmatullahi wabarakatuh. In the name of Allah, the Most Gracious, the Most Merciful. Greetings of peace. Mr Speaker, for the information of the Honourable Members, the ministry, through the Communications and Multimedia Media Commission (SKMM), has always focused on improving communications infrastructure through the provision of high-speed broadband coverage using various technologies and the efforts of the government.
This question has two parts, Mr Speaker. The first asks about the percentage coverage of Internet access by mukim in the state of Johor, by category of wired and wireless, up to now, and what efforts the state government, in cooperation with the federal government, are making to expand coverage and improve access. As for the second part, Mr Speaker, I have already answered it in the earlier supplementary question; I will answer the first part first.
The following are the percentage coverages. First, I will answer mobile 4G coverage. Sorry, Mr Speaker, I do not have complete data; the data provided by mukim is by district. There is no mukim-level figure, the study is by district. So by district, the overall percentage for the state of Johor, the average percentage, is 98.28%, and by district: Batu Pahat, 98.6%; Johor Bahru, 99.96%; Kluang, 96.68%; Kota Tinggi, 94.43%; Kulaijaya, 99.36%; Ledang, 97.69%; Mersing, 88.4%; Muar, 97.39%; Pontian, 97.49%; and Segamat, 96.24%. As for fixed broadband, it is calculated based on the number of premises. For the whole state of Johor, the number of premises available is 616,038. Batu Pahat, 57,934; Johor Bahru, 360,592; Kluang, 38,568; Kota Tinggi, 26,311; Kulaijaya, 40,247; Ledang, 13,923; Mersing, 6,510; Muar, 32,761; Pontian, 18,769; and finally Segamat, 20,423. Thank you, Honourable Member.
Yes, Honourable Kemelah, please proceed with your supplementary question.
Thank you, Mr Speaker, and thank you to the Honourable Member for answering the question. Although I asked for percentages, because when answering for wired access he only mentioned households, we want to know what the target is and how much has already been achieved. However, if we look at it generally, rural areas are indeed quite left behind and are at a disadvantage, with your permission. I will take myself as an example: I live in a rural area, far from the town. At one time I had to pay RM137.00 for a two-megabit line. That was what TM could provide. RM137.00 for two megabits per second. In 2019 the Pakatan government lowered and revised the rate for two megabits, so now I pay RM73.00. That is still at the level of RM35.00, what is this, for one megabit, yes. It is very different from those in the towns, who can get RM80.00 or RM90.00 for 20 or 30 megabits per line. My question is: when will rural people get an advantage, or at least have costs reduced, while enjoying the same speeds as those in the towns? Thank you.
Honourable Member, please proceed.
Mr Speaker. In the earlier answer, I did answer in the supplementary questions. That is why the next phase, previously called MSCP, is important. MSCP was phase 1, and all the towers we built for coverage, 13 in total, were in rural areas, 13. As for the next ones, the coverage towers we have are also mostly in rural areas. So that is the initiative the government has taken, and yesterday too, in my speech, last Thursday, in my winding-up speech, I stated in detail the federal government's initiative to upgrade areas and to give more focus to rural areas. So I gave the details at that time, and the upgrading that I can state, Honourable Member, and this project is 2021, from 2020 until 2021, next year at the end, God willing. I have also told the Minister to postpone from 4G to, from 5G, to focus on 4G, with the initiative for fixed broadband to replace copper with fibre optic. Thank you, Honourable Member.
Yes, Kota Iskandar.
Thank you, Honourable Speaker, and also to the Honourable EXCO for the answer. Internet coverage, with your permission, cannot be separated from the second MSCP project or JENDELA. And previously I asked in a supplementary question how the government coordinates the two concession companies involved in building communications infrastructure in our country, and in Hansard the Honourable EXCO stated that no charges are imposed by those two concessions. I ask that this statement be a responsible statement and not in any way misleading in this august House. Because in the oral reply I received this morning, it was mentioned that among the packages I proposed earlier, cooperation with TNB could not be implemented specifically in providing 5G service infrastructure because of the charges imposed by KUJ, as stated in the written answer.
Therefore, I want to ask again: does the Honourable EXCO still maintain that in this August House there are no charges imposed by the two concessions I mentioned yesterday and in the earlier supplementary question, or will he correct that statement and confirm that there are indeed charges imposed by those concessions? For that reason, back in the Pakatan Harapan days, we set up two committees, namely the Johor State Telecommunications Infrastructure Main Committee and the Johor State Communications and Multimedia Council, to play the role of facilitator and also to coordinate the charges imposed by both concessions.
Honourable EXCO, please.
Mr Speaker, this matter is actually not a case of "there is" or "there is not"; no final decision has been made yet, Honourable Member. We are in the negotiation process, and we understand that, by coincidence, this communication is not solely a full decision for the state government, it involves the federal government. And regarding the TNB matter, which has, that is still undecided, we are not saying there is or there is not, we are in the negotiation process, that is what I mean, Honourable Member. There is no decision yet, and we are focused on, still in the process of discussion, to resolve the KUJ and TNB problem. And the state side, we are trying to help to the best of our ability, Honourable Member. Thank you.
Mr Speaker, my question has still not been answered. Because in the previous question, Mr Speaker stated that all charges are subject to the discretion of the federal government under the Malaysian Standard Accessing Pricing (MSAP). The question is whether or not charges are imposed by the state government's side by the concession companies that are not covered and not included in the MSAP.
Yes or no, Honourable Member?
There is no decision yet, yes or no, I am saying there is no decision yet. If there is a decision, we will say yes or no, Honourable Member.
Mr Speaker, how can it be said there is no decision yet? This concession has been operating for years, not since yesterday. This concession has been running for several years. Have charges been imposed or not on telecommunications operators or Telcos in the state of Johor by the two concessions, which charges are not part of, or are partial, with your permission, from the MSAP?
Okay, Honourable Member, for that I will obtain more complete information and I will answer in writing, Honourable Member. Thank you.
Pekan Nanas, supplementary question.
Mr Speaker, is the provision of Unifi facilities a mandatory condition in the process of applying for new property development projects, and what is the minimum time for the owner of a new property to successfully apply for Unifi? Thank you.
Honourable EXCO, please, Honourable EXCO, please.
I do not understand this question, repeat it.
Will the provision of Unifi facilities become a mandatory condition, one that must be carried out in any new property project, and is there a minimum time set by the government so that the owners of new property can get Unifi services when they apply?
Jemput.
Honourable Member, thank you for the question. So far there is no decision, and this is actually under the local authorities, Honourable Member, under the Local Authority, and we do not yet have a decision. I do not know, EXCO, if you have information that can help?
In writing only, in writing.
Why, Honourable Member? For any development, the application for planning permission goes through the Local Government. So I look after, I do look after this coverage, but the enforcement matter is under the Local Government. And that is why I said I have to refer this information to the EXCO for Local Government. Thank you.
Okay, if there is any information, it can be given in writing, Honourable Member, okay. The next question. Honourable Tiram, please.
Mr Speaker, my question is Question No. 9.
The road at the junction to Kota Tinggi to Bukit Tiram, under the flyover, is extremely bad. It has been brought to attention many times. This condition will lead to accidents.
Honourable EXCO, please.
In the name of Allah, the Most Gracious, the Most Merciful. Thank you, Mr Speaker. Tiram's question concerns wanting to know when the Public Works Department (JKR), the state government or the agency will repair the junction at Bukit Tiram, which is said to be in a bad condition.
For Tiram's information, JKR has submitted an allocation to apply for RM500,000.00 to repair this junction. This junction is on a federal road, so we have applied for it to be repaired. God willing, if it is approved, early next year we will proceed immediately. Before Tiram or others wish to put supplementary questions, I think for small questions like this, sorry, not small, but important questions like this that are not related to policy, just WhatsApp me or write a letter, God willing I will send it straight to the JD. We have 10 JDs, Honourable Member, and they are very efficient. Send it today, tomorrow they have already investigated. That means if it is sent today, it is already in their records. The records before this also show that if the YB can go there and take a photograph standing beside the problem and send it to me, it will be strong evidence for the JD to take action, and I will ensure the allocation applied for is implemented as quickly as possible. And we do not want problems like bad roads like this to cause road accidents that take lives. Thank you, Mr Speaker.
Yes, Tiram. Please proceed with your supplementary question.
Mr Speaker, supplementary question. Actually, the condition of this road is not only what I meant just now. I have brought this matter up, I recall about two or three times regarding this road, this junction. It is not made up, which is why I bring it forward here. And also, another point, Honourable EXCO, I want to know that for two and a half years in the DUN Tiram area, I have been going around to many places that have not been repaired, the roads are bad, and it was not only before me or during my time, it was already like this before me too. I just want to ask: is there a committee monitoring? Because sometimes there are people who complain, sometimes there are no complaints made, but the problem still exists there. This is what causes accidents and various other things. I want to ask, my question is, is there a monitoring committee after roads are built, or to inspect the condition there? Thank you.
Honourable EXCO, please.
This supplementary question has spread to other issues. But, if it relates to the Tiram junction, the allocation has indeed been requested and will be implemented. And, Honourable Tiram mentioned that this matter has been raised twice, which is why I ask Tiram and the others, if there are problems like this, to submit them directly to me. They do not need to be brought to the House, because if they are brought to the House there are too many issues and they cannot be monitored. So, I hope that from now on I will personally go to this Tiram junction, to ensure action is taken immediately. Thank you.
The next question. Honourable Endau, please.
Mr Speaker, my question is Question No. 10.
What is the status of the construction of the bus terminal in the town of Endau, given that the existing bus stops are now very dilapidated and unsafe?
Honourable EXCO, please.
Mr Speaker, thank you for the question from the Honourable Endau. Mersing is a major tourist destination of the country in the future, and it is known as, today we have begun to recognise Pulau Rawa as the Maldives of Malaysia, and Mersing will soon become the third Geopark after Jerai and Lembah Kinta. In connection with that, early preparation in terms of infrastructure, roads, jetties and perhaps even an airstrip needs to be planned from now.
To answer this question, based on information from the Engineering Department of Mersing District Council, the process of appointing consultants for the construction of the bus terminal in the town of Endau will be carried out by Mersing District Council on 20 December 2020. Thank you, Mr Speaker.
Yes, Endau. Supplementary question? Okay. Next, Honourable Yong Peng. Please.
Mr Speaker, Yong Peng's question is Question No. 11.
When heavy rain causes the oil palm and agricultural estates, especially around Jalan Labis and Jalan Paloh, to be flooded, what action is the government taking to overcome this problem?
Honourable EXCO, please. 5 minutes, Honourable Member.
Mr Speaker, the pattern of climate change and climate change occurring in Malaysia at this time has to some extent also contributed to the instability of agricultural activities, including in the state of Johor. The high and prolonged intensity of rainfall results in low-lying areas frequently suffering flood disasters. This phenomenon certainly affects farmers, through damage and destruction of crops, which likewise affects agricultural production and income.
The government, particularly JPS, will try as far as possible to reduce the areas affected by floods from time to time. The implementation involves widening and deepening rivers, constructing drainage systems, and also implementing flood mitigation projects. However, for oil palm and agricultural areas that have ownership and landowners, they should take action and be responsible for the land they own. The government can only help by providing main drainage in nearby areas so that the flow of water runs more smoothly, while within plantation or estate areas it must be carried out by the owners themselves. Thank you, Mr Speaker.
Ha, Yong Peng.
Thank you for the answer from the Honourable EXCO. Regarding the reason, the impact of rising water in these agricultural areas, farmers are affected in terms of their income. Will the government provide any compensation for this disaster? Thank you.
Honourable Member, 1 minute.
Mr Speaker, the government has allocated RM100,000.00 for this programme. That is for disaster assistance, and additional amounts can be applied for if necessary, based on the justification of the disaster. The rate of assistance for fruit and vegetable growers is a minimum of RM500.00 and a maximum of RM2,000.00 per hectare, within a maximum assistance limit of 2 to 4 hectares. Assistance in the form of agricultural input materials will be given only to growers who submit applications, based on the assessment of the area carried out by the district agriculture office together with complete documents. Thank you.
The time has now reached 11.00 o'clock. I will end the questions here. Any questions listed that have not been answered orally will be answered in writing in the same sitting.
Written Questions.Questions
Answers to written questions by Honourable Members have been tabled on the table of the meeting.
I adjourn this Sitting until 11.15 a.m. Thank you.
The Sitting was adjourned at 11.00 a.m.
The Sitting resumed at 11.30 a.m.
Continuation of debate on the second reading of the Appropriation (2021) Bill for the year 2020.Bill
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy of Allah. Honourable Members, the Debate on the Motion for the Second Reading of the Rang Undang-Undang Enakmen Perbekalan (2021) Tahun 2020 now continues.
Honourable Chairman of the Committee on Agriculture, Agro-based Industry and Rural Development, please.
Peace be upon you, and the mercy and blessings of God. Greetings of peace and prosperity to Johor. Mr Speaker, first of all, I humbly offer my gratitude and extend my warmest congratulations and best wishes to His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Negeri Johor Darul Ta'zim, on the celebration of His Majesty's birthday on 22 November 2020, corresponding to 6 Rabiulakhir 1442H, which has just passed.
Mr Speaker, I extend my sincerest thanks to the Honourable Members who have spoken positively in this House about the agriculture sector and rural development in the state of Johor. The majority have welcomed and accepted the reality of the importance of the agriculture sector and the food industry, which is the most stable sector when the country faces an economic crisis. Furthermore, it also becomes a new source of income for the government, while ensuring the stability of food supply for all. And, based on the interest and enthusiasm shown, this strengthens my spirit and commitment, and that of the government, to advance the agriculture sector through this portfolio.
Mr Speaker, in discussing agriculture, I would like to inform the House that it is divided into two parts, namely commodity crops and agro-food crop cultivation. In the state of Johor, of the 51.11% of existing agricultural land, 63.96% is cultivated for commodity crops, while only 36.04% is used for agro-food crop activities.
At the same time, I would also like to emphasise that, to make the food security agenda a success, which emphasises the levels of availability, accessibility, affordability and stability of food, one thing we must never forget is the fate of the unsung heroes, namely the farmers, livestock breeders and fishermen who supply our food every day. This means the government places equal emphasis and focus on empowering farmers, livestock breeders and fishermen so that their standard of living continues to improve from time to time. This also means we must ensure that farmers earn an attractive and stable income, and that the agro-food profession becomes attractive and even "sexy", if I may say so, in the eyes of society, especially young people. The commitment and resolve of the government, as I have stated before, have provided a very large allocation that has never been provided before by the federal and state governments. That is RM27.65 million for 2021 for the agriculture, fisheries and veterinary sectors, and RM35 million for a two-year period, namely 2021 and 2022.
This covers the development of all activities within the value chain of the state's agriculture and agro-food sector, to be utilised by agro-food operators, whether small, medium or large. I agree with what was raised by the Honourable Member for Sri Medan regarding the perception among young people that profitable agricultural activities only involve commodity crops. This is because they are seen as more modern, less burdensome, and yielding stable income, although not always. The reality is that this has been observed, and there is greater awareness among the public, who are also farmers, that with the same acreage, Agro-Food Park activities yield more substantial returns compared with commercial agricultural enterprises.
Mr Speaker, our greatest mission is to provide a wider market platform so that farmers have greater confidence in the market for their crops. This matter is also an important element in the agriculture value chain that must be strengthened. In this regard, the state government will continue to mobilise the efforts of agencies such as FAMA and organisations such as the District Farmers' Organisation (PPK), which operates 28 Agricultural Produce Collection Centres (PPHP) in their respective areas as centres for collecting and marketing farmers' produce. The importance of PPHP has always been emphasised by the state government, and for that reason, with this initial commitment, the government has allocated RM500,000.00 to upgrade the infrastructure of two PPHP that were promised, namely the PPHP in Kluang and Benut. Apart from that, the government also strongly encourages contract farming, a model involving large entrepreneurs and small entrepreneurs. This is to ensure that farmers or entrepreneurs can focus more on production rather than being burdened by concerns over the market for their produce. At the same time, it will benefit large entrepreneurs by securing a more consistent supply to meet their demand.
Mr Speaker, besides that, this model will also reduce the problems faced by large entrepreneurs in expanding their planting areas and also the problem of labour shortages. This means that collaboration between small and large entrepreneurs, in which large entrepreneurs lead demand and distribution, will create a healthier environment in the agriculture sector as a whole. The Honourable Member for Parit Yaani has mentioned the issue of high operating costs, which involve agricultural input costs and animal feed costs. The government currently strongly encourages the use of non-chemical fertiliser in agricultural activities.
While mechanisation reduces operating costs and at the same time reduces the workload of farmers.
Apart from that, this will also increase the supply of chemical-free agro-food products to meet consumer demand. The government will not force farmers and the public to cultivate something that yields minimal returns; rather, it depends on the purpose of the cultivation, whether for subsistence, supplementary income or commercial business. With regard to inadequate agro-food infrastructure, not all sectors in agriculture require treated water supply or electricity. Regarding the lack of synergy and implementation mechanisms as stated by the Honourable Member for Parit Yaani, I would like to state that, for the time being, synergy and integration between departments at federal and state levels are in a very good condition. As evidence, these departments at federal and state levels have succeeded in securing large allocations for the advancement of the agriculture sector and agro-food in this state, now and in the future. These departments, and the agencies under the agriculture sector, are also involved in the Johor State Food Security Committee. This is coupled with the state government's commitment to strengthen the agro-food sector.
Mr Speaker, in the context of research, MARDI Johor state allocated a total of RM2.24 million for 2020 to carry out research projects covering various agro-food research, such as fruit at RM730,000.00, vegetables at RM20,000.00, industrial crops at RM50,000.00, livestock at RM1.2 million and entrepreneur development at RM50,000.00.
Meanwhile, the Department of Fisheries has allocated RM1.48 million from the federal government for master development studies and breeding through selective breeding and field evaluation, development of alternative species hatchery technology, livestock technology research, fish feed research, shellfish research, socio-economic study of green collar jobs in the agriculture sector, and evaluation of blue economy strategies in fisheries.
Mr Speaker, regarding the Permanent Food Production Park (TKPM) of the Johor State Department of Agriculture, there are 8 projects with a total area of 452.38 hectares and 77 entrepreneurs. And up to now, based on investigations carried out, 8 persons have breached the conditions. That is 3 at TKPM Pagoh, 1 participant at the Ayer Hitam Agricultural Institute, and 4 participants at TKPM Sedili. For information, all of them have withdrawn and have been removed from TKPM and replaced with new participants.
Mr Speaker, as for the TKPM under the Department of Veterinary Services, there are 36 TKPM and grazing areas with a total area of 3,829.725 hectares involving 186 participants. The lease period is 20 years for each participant, and the agreement will be renewed every 3 years subject to monitoring and evaluation. Of these 186 participants, through monitoring and the regularisation process, 61 are inactive and 8 have breached the conditions, such as planting oil palm and vegetables. Evaluation of the optimisation of existing agricultural land resources will always be carried out so that it can be fully utilised.
The Honourable Member for Parit Yaani also raised the issue of fishermen who take advantage by claiming allowances to go to sea. Regarding this issue, the Department has identified 739 boat licences that have been inactive for 3 years. In accordance with standard operating procedures, all licence holders will be issued show-cause notices, and if no reply is received within 14 days from the date of the show-cause letter, cancellation will be carried out, and the regularisation of these licences will be continuously implemented by the Department of Fisheries every year.
Mr Speaker, I extend my congratulations on the initiative of the Honourable Member for Endau, which involves agricultural sector agencies in local development. God willing, the state government will help to make the success of this rural economy project initiative. Regarding the issue raised about the electricity supply cost for agro-food operators, it is informed that this tariff has been set by Tenaga Nasional Berhad due to the type of building use, such as farm produce collection centres, pumps and electric pumps. However, I believe that no agricultural activity uses electricity exclusively. Regarding the provision of incentives or financial assistance to fishermen during the monsoon season, the government only provides a catch subsidy scheme for fuel and petrol, fishing catch incentives and fishermen's living allowances. At the same time, the government also provides the Natural Disaster Relief and Fishermen's Welfare Scheme.
Mr Speaker, it is indeed true that 58.8% of pineapple cultivation is in the state of Johor. For the information of the House, the Honourable Member for Mahkota, the RM19 million allocated is for the state of Johor only, not for 1 Malaysia. This covers the expansion of planting, all forms of assistance, inputs and also the development of seeds within the state. I feel we should be grateful for this news, and it is indeed good news for pineapple industry operators in the state of Johor in particular. The Malaysian Pineapple Industry Board (LPNM) Johor state has spent RM6.6 million on the pineapple acreage expansion programme in this state in 2020. Meanwhile, the acreage achieved so far is 1,022 hectares compared with the target of 800 hectares, with additional allocation from the Economic Stimulus Package of the federal government.
Mr Speaker, regarding the concept of mentor-mentee, as proposed by the Honourable Member for Mahkota, I am pleased to inform the House that LPNM has already introduced contract farming for pineapple cultivation, namely the Sustainable Pineapple Cluster Project (PKNL) in Tanah Abang, Mersing, involving 300 acres of land belonging to SSI. This involves cooperation with Kulim Pineapple Farm company as the anchor company, in which the participants are young farmers who each cultivate 5 acres. Although the harvesting process has not yet ended, I would like to inform the House that, based on current harvest yields, the participants are expected to be able to repay their loans from Agro Bank of RM50,000.00 in one lump sum or in bulk. This shows that the participants will earn an income of more than RM5,000.00 a month. Certainly, this is a good example to be expanded further in other places based on land suitability and an appropriate target group. For this purpose too, LPNM has established cooperation with FELDA to cultivate FELDA lands that have not yet been cultivated. And for information, as a start, this will be implemented at FELDA Redong with an area of 20 acres and FELDA Lenga with 70 acres. In this regard, I would like to record my heartfelt thanks to the Chairman of LPNM Johor state, who is the Honourable Member for Bukit Kepong.
Mr Speaker, regarding the Settler Development Programme (PPP) in FELDA areas. As the Honourable Member for Mahkota is aware, an allocation of RM1.0 billion has been provided as announced through the FELDA white paper. This programme is for FELDA settlers across the country, as well as institutions such as the FELDA Cooperative, to carry out agricultural and livestock economic activities. It will reduce settlers' dependence on income from commodity crops, namely oil palm or rubber, by diversifying sources of supplementary income. For 2020, FELDA spent RM3,555,922.10 to implement this programme. Going forward, FELDA is expected to receive a grant from the government of RM250 million each year. In the state of Johor, there are 27,642 settlers. Therefore, the estimated allocation value that can be channelled by FELDA is RM110,568,000.00. The project will be managed by the Federal Land Development Authority (FELDA), covering 2 regions, namely the southern region, Johor Bahru, and the Segamat region. The implementation period is 4 years, from 2019 to 2022. The methods of implementing PPP are as follows, namely Model A, plasma projects and cooperatives under the management of Agro Bank, and the Model B programme, plasma projects and cooperative projects under the management of FELDA. The approval limits for project applications are as follows. For plasma projects, a direct grant of RM2,000.00 per settler is given in the form of material and service supplies, and for cooperative projects, a direct grant based on each settler in each plan is calculated at RM2,000.00 per settler. The new PPP model, with the involvement of Agro Bank as the management agent, targets the involvement of at least 100 cooperatives and 500 plasma participants to implement Phase 1 of the project with an allocation of RM100 million. At the initial stage, this project will be carried out for 3 agricultural activities, namely pineapple, ginger and fertigated chilli in the agriculture sector, and will be expanded further. Agro Bank will provide an operator for each crop, and each participant is entitled to choose the operator they wish to work with. Each settler has a maximum eligibility limit of RM20,000.00.
Mr Speaker, it is also informed that, regarding the involvement or cartels that control almost all agricultural activities throughout Malaysia, as alleged by the Honourable Member for Mahkota, I am pleased to inform the House that the Johor state government has never financed the cartels in question and has not excluded small entrepreneurs in the agriculture sector, particularly livestock farming. In fact, according to records, 3,352 operators in the beef, buffalo and goat meat and milk industry in the state of Johor have been given attention.
Mr Speaker, the promotion of agro-food crop cultivation does not mean the government is encouraging the encroachment of existing land. Farmers or entrepreneurs will be defined as trespassers by the government if they cultivate agricultural sites that are privately owned by other individuals or owned by the government without permission. What is important is that they must obtain permission from the relevant party or the landowner. Therefore, in the process of starting cultivation or expanding crop activities, this can be done by changing the crop activities on commodity land that is considered unproductive or less productive.
With regard to the myGAP and myOrganic certifications, as raised by the Honourable Member for Jementah for the information of the House, among the conditions for obtaining such certification is to have land whose ownership is valid, or a lease or tenancy whose term of lease or tenancy is still valid. This is important for the traceability of farmers' produce. This allows their produce to receive recognition, added value, and to be recognised as safe. Throughout 2020, a total of 144 farms were granted such certification throughout this state.
Mr Speaker, regarding the supply of clean water in the Kampung Minyak Beku area, Batu Pahat, for the information of Members of this House and the Honourable Member for Senggarang, the Kampung Petani area and its surroundings are part of the Rural Water Supply Project, which will be tendered in 2021 by the Johor State KPLB.
Mr Speaker, regarding the existing Village Head allowance, their allowance was actually stopped until July 2020 following the rebranding of MPKK to JPKK. However, for the information of the Honourable Member for Kempas, the state government never intended to stop or terminate the payment of allowances to existing Village Heads. The state government continued to pay Village Head allowances until December 2020. Meanwhile, the KPLB, through its letter dated 9 October 2020, also agreed to continue paying existing Village Head allowances from August 2020 to December 2020. For the record, Village Heads have been paid up to November an amount of RM400.00 from the state government and not RM200.00 as alleged, and an additional RM500.00 from the KPLB.
Mr Speaker, regarding the need to match food banks with data on farmers in the state of Johor, as proposed by the Honourable Member for Bukit Naning, the Department of Agriculture is aware of the importance of a database in the agriculture sector for farmers and entrepreneurs. Through the Agri-Geo Portal developed by the Department of Agriculture, the data is channelled by Crop Development Agents (APT) throughout the state. Entrepreneurs under the guidance of the department are registered for the purpose of monitoring the performance of agricultural projects, such as crop types, project area, quantity, yield and value. The data of farmers and agricultural entrepreneurs will also be used as a guide for agricultural extension activities, including technical advisory services, good agricultural practices through guidance towards myGAP and myOrganic certification, and evaluation of those who receive government assistance. In this way, the Department can help farmers increase productivity and agricultural yield, so that they can compete in a wider and more profitable market. For the information of the Honourable Member for Bukit Naning as well, tempeh is in fact also a source of protein made from agro-food produce that has great potential to be cultivated commercially.
Regarding the problem of water sources in the Bukit Naning area, for the information of the House, for the time being, the existing Rural Water Supply (BLB) project is being implemented in the Bukit Naning State Assembly (DUN) seat. God willing, it will benefit 800 households and is expected to be completed in 2021.
Mr Speaker, most Honourable Members have emphasised the distribution of existing assistance and incentives provided to target groups. I am pleased to inform the House that all allocations provided by the government are for all activities or players in the agro-food sector, covering small, medium and large farmers involved in the entire value chain of the agro-food sector in this state. Therefore, they are all eligible to apply. And approval is given to those most eligible to receive it. The government has taken note of the emphasis on transparency and fairness so that, as far as possible, genuine entrepreneurs who need incentives and assistance are prioritised. The government also took into account the reminder from the Honourable Member for Mengkibol that the government should not continue to provide only various forms of cash assistance that may not generate income. And certainly, this will serve as a guide.
As I have stated in the House before, for the future the government will emphasise the Food Safety Agenda, with permission, or food safety, industrial use of IR 4.0, with permission, the use of mechanisation and automation, and increasing the adaptation and application of technology. Emphasis is placed on seed quality, the balance of trade, and sustainable development goals by prioritising sustainable agriculture, taking into account its impact on the surrounding environment.
Regarding the modern agriculture project raised by the Honourable Member for Mengkibol, this modern agriculture centre was launched in 2004. It involves a total area of 3,655.2 hectares owned by the Federal Land Commission and under the direct supervision of the Ministry of Agriculture and Food Industries (MAFI) Malaysia. It is divided into components used by the Malaysian Veterinary Institute and the Animal Husbandry Centre as a training centre and milk production area of 566 hectares, the Ayer Hitam Agricultural Centre 81.7 hectares, the FAMA Collection Centre 4.86 hectares, the Modern Agriculture Administrative Office 5.286 hectares, and the remaining area of 2,997.2 hectares is leased to participants for a period of between 10 and 30 years to cultivate various crops, livestock, ornamental fish and agro-tourism. I am pleased to inform the House that although it is located in the state of Johor, all administration, monitoring and operations are managed by the Ministry.
Mr Speaker, regarding the matter raised by the Honourable Member for Machap, concerning odour pollution and the nuisance of flies, the farm that caused the pollution has been issued a closure notice because it operated without a valid licence. Based on the latest monitoring by the Department of Veterinary Services in November last year, no livestock activity was being carried out at the site, and regarding the use of chicken manure fertiliser at the oil palm plantation that was reported, this is outside the jurisdiction of the Department of Veterinary Services. However, the Department always reminds and gives strict warnings to poultry farm operators to treat manure and not to supply untreated chicken manure to any party in the future. Furthermore, based on information and records of the Kluang District Veterinary Services Department, up to now there have been no applications for new poultry farms in the Simpang Renggam area.
Mr Speaker, the issue of floods is one that is frequently raised by the majority of Honourable Members. Regarding the flood problem along the banks of the Sungai Batu Pahat, which has been identified as extensive and long and requires dredging and upgrading works involving large allocations, the Department proposes that the dredging and upgrading of the Sungai Batu Pahat be requested from the federal government. Referring to the 3 flash flood hot spots that often occur in the DUN Skudai area, such as at Kampung Laut, the Jalan Makmur 19 to 24 area, and Taman Damai Jaya, these are low-lying areas that are prone to flooding. The Taman Damai Jaya area was originally a flood basin area that is easily flooded. To overcome this problem, the Department has identified measures that can be carried out, namely the construction of river embankments and the installation of pumps to pump water out of flood-prone areas, which will roughly require large allocations because they involve construction costs and operating costs once completed. In the meantime, in places where river reserves are insufficient, the land acquisition process needs to be carried out.
Regarding Kampung Poh Chee Ling, this area is found to be something like one large lot without a proper drainage system. Although the local authority (PBT) has built roadside drains and the Department of Irrigation and Drainage (JPS) has extended the drain to the Sungai Skudai, it still has not been able to overcome the flood problem because there is no proper drainage within the village area. Although both agencies have carried out maintenance along the river sections that have been built and the drains that have been constructed, the agencies also believe that the ponds and sediment traps required to be built within the camp area could be implemented by the Ministry of Defence.
Mr Speaker, I thank the Honourable Member for Semerah for raising the Johor Barat project, which has developed the agricultural sector in the western area of the state of Johor Darul Ta'zim. However, the RM40 million allocated by the state government to maintain agricultural drainage, which is almost 5,900 kilometres long, is certainly insufficient to maintain the Johor Barat area, which has 4,900 kilometres. This is because the allocation will not only be used for ditch maintenance alone but also covers other maintenance, including ditch maintenance that is not agricultural drainage, including rubbish disposal work in rivers, repairing broken coastal embankments and main drains. With pleasure, I would like to inform the House that this matter has also been conveyed to the relevant ministry at the federal government for consideration.
Regarding the status of the FAMA building at Parit Sidek, Jalan Muar – Batu Pahat. For the information of the Honourable Member for Semerah, this complex was actually built in 2007 on land measuring 2 acres and was used in 2009 with the aim of establishing a sugarcane farm collection and marketing centre for the local market and export to Singapore. The operation of this complex was leased to Pure King Company, an experienced company with a wide market, in 2019. However, it only lasted until 2014 because the company moved to its own premises. The complex has been left vacant until now due to soil subsidence at the TNB substation sector and the apron section of the building, in addition to cases of vandalism and theft that have occurred. FAMA will repair the existing damage starting early 2021, and once completed, FAMA will offer leases to advanced agro-based industry entrepreneurs. The entrepreneur interview process will be carried out in the same year.
Mr Speaker, regarding the flood problem highlighted by the Honourable Member for Bentayan, the JPS Johor has applied for an allocation for 1 PISMA drainage master plan for the Maharani town, Muar. This master plan can propose a suitable system for the area. It is hoped this application will receive good news from the federal government. As for the proposal to maintain twice a year proposed by the Honourable Member for Bentayan, it may be beyond the Department's allocation capacity because it involves 1,300 kilometres of drainage in Muar district alone. However, additional maintenance will be carried out according to needs and priorities from time to time.
Mr Speaker, I extend my congratulations to the Honourable Member for Tanjung Surat, who intends to upgrade tourism infrastructure at Batu Layar beach. KEJORA has noted this matter, and the major constraint faced is that most of the Batu Layar beach area is privately owned land.
Regarding the progress of the Green Evolution Programme, as raised by the Honourable Member for Tangkak, which was established by the previous government, the present government has largely continued the intention of this programme. However, the present government has added value to the programme and outlined a direction that is in line with the federal government and, at the same time, takes into account the potential and aspirations of the state government in the present more comprehensive agro-food sector.
Mr Speaker, regarding the problem of unlicensed fishermen in Kampung Perigi Acheh raised by the Honourable Member for Tiram, the Department of Fisheries is carrying out the process of regularising existing boat licences. Once the regularisation process is completed, applications for new licences will be considered.
Mr Speaker, as for the viral video regarding the problem of pineapple marketing in Ayer Baloi, Pontian at the beginning of the COVID-19 season, which was highlighted by the Honourable Member for Pulai Sebatang, the video was uploaded by a non-pineapple grower. However, the marketing issue was resolved immediately by LPNM, FAMA and LPP.
I would like to inform the House that this is a classic example of the need for good relations and networking between growers and other agencies, at the district and state levels, so that problems of this kind can be resolved well and quickly. Thankfully, the grower involved has apologised to the agencies for the viral video, and they have expressed their gratitude for the market assistance provided.
As for the Agricultural Produce Collection Centres (PPHP), as also raised, I would like to inform the House that 28 PPHP have been established by district farmers' organisations, including in the districts of Segamat and Kota Tinggi. Up to 2020, I would like to state that transactions at existing PPHP amounted to RM8.8 million with a capacity of 1,246 metric tonnes of agricultural produce. At the same time, there are now two large-scale farmers' markets in operation, namely the Skudai Farmers' Market owned by PPK Johor Bahru Timur, involving 65 farmer entrepreneurs, and the Pontian Farmers' Market owned by PPK Pontian Selatan, involving 25 farmer entrepreneurs.
Mr Speaker, I would like to express my thanks for the concern of the Honourable Member for Serom regarding the potential of the deep-sea fishing industry. The Department of Fisheries Malaysia certainly welcomes all parties to explore deep-sea fisheries, particularly in zones C2 and C3.
Entrepreneurs who are interested and have strong starting capital may submit working papers to the department. The federal government has allocated RM150 million for the Vessel Modernisation and Catch Mechanisation Programme for 2021. Regarding the discovery of a new oyster species, with permission, around Tanjung Agas and the Sungai Muar and the estuary of the Sungai Kesang, of the white oyster type, which has been given the scientific name Crassostrea Saidi, the Johor State Fisheries Office is aware of the potential for oyster farming in the state of Johor, especially in Muar district. For the information of the Honourable Member, at present, oyster production in Muar comes from natural or wild sources. The Johor State Department of Fisheries welcomes all parties who are interested in cultivating this oyster farming.
Regarding the issue of soil acidity in the paddy fields within the Serom State Assembly (DUN) area, I am pleased to inform the House that the Crop Biosecurity Division of the Johor State Department of Agriculture has conducted a paddy field treatment trial using humic acid treatment in the paddy fields of Kampung Telok Rimba for 2 seasons. For the first season, it began in July last year, and now it has entered the second season, which began in mid-November last year. This is an experiment with non-chemical materials in an effort to improve soil acidity and improve paddy field management, leading to higher yields throughout the state of Johor. This is also an effort to strengthen paddy fields outside the granary areas within the state of Johor, which is one of the Johor state's commitments to paddy farmers in the state of Johor.
Regarding the floods that occurred in Tanjung Agas, Parit Bunga, Kesang, and West Tanjung Gading, which I believe are referred to as having occurred in June 2020: for the information of the Honourable Member for Serom and all Members of this House, the appointment of the contractor for the Sg. Kesang Flood Mitigation Plan (RTB) project has been terminated. After termination, certain procedures must be followed to appoint a new contractor. Therefore, the bypass through the AMJ Highway was delayed beyond the expected time. Some actions were postponed due to the Movement Control Order (PKP), and were not deliberately neglected. The project tender will be carried out at the end of January 2021, and by July 2021 the project is expected to commence on the AMJ route. The maintenance of the Parit Keliling was also completed in November 2020. The issue raised by the Honourable Member is related to the flood in June 2020. At that time, work was indeed not carried out because government departments only resumed operations in mid-May 2020. After government departments were able to carry out their business, the contractor appointment process was completed and work began in early July 2020.
Mr Speaker, I sympathise with the residents of Kampung Pasir and its surroundings, as informed by the Honourable Member for Perling. The inflow of water into the Kampung Pasir area and its surroundings on 22 November 2020 was because the hinges of the control gate located there were broken due to pressure from high tide water. Repairs were completed the same day and after the high tide had receded. Now, the control gate is operating well.
Mr Speaker, at the same time, pump operations had to be stopped several times because the pump impeller became clogged with a large amount of rubbish. The rubbish discarded by residents in the area is so abundant that it interferes with pump operations. The JPS had to appoint a contractor to carry out rubbish removal work around the pump area. At the same time, the JPS also had to replace the existing pump with another pump because of the impeller problem. It is hoped that this incident becomes a lesson for local residents to jointly look after the cleanliness of the river so that such problems do not recur.
Mr Speaker, regarding the matter proposed, the provision of yield incentives proposed by the Honourable Member for Bukit Batu, I would like to inform the House that such incentives have indeed been given to paddy farmers throughout the country. Apart from input incentives, a total of RM2,400.00 is provided by the Farmers' Organisation Authority for each hectare. Paddy farmers are also provided with output or yield incentives of RM390.00 per metric tonne of paddy they cultivate.
Mr Speaker, as emphasised by the Honourable Member for Kukup and Sedili, I agree and fully support the proposal to strengthen the agro-tourism programme as proposed by the Honourable Members. We hope for the success of these projects, which depend largely on entrepreneurs who can make their enterprises an attraction. The state government always welcomes outside investors who come with funds and expertise to invest in the agro-food sector of the state of Johor, with IoT and IR 4.0 technology, and especially those who have identified land and sites for cultivation.
Mr Speaker, I extend my heartfelt thanks and congratulations to the State Assembly Members who have shown interest and enthusiasm for the Johor Tani agenda and the Johor Darul Ta'zim State Food Security agenda. In general, I think the majority support this initiative, thank you very much. And I take positively the sarcastic criticisms made, which further strengthen the government's commitment to making the Johor State Food Security Agenda a reality. It will not only increase the income of farmers but also become a new source of income for the state government.
Mr Speaker, we say that this is not merely the survival of this industry, but also a leap in the agro-food industry sector. I take note of the concerns of the Honourable Members on the following matters: transparency in the assistance process, fairness to those who are eligible, efforts to reduce bureaucracy, wide dissemination and circulation of information, improving staff effectiveness, good integration and cooperation between agencies, improving relations between the government and industry players, optimising the use of idle land, and the implementation of various assistance not only in the form of grants but also matching grants and various loans for players in the agro-food sector in the state of Johor. The true target at government level is the establishment of an Agriculture Export Centre in cooperation with the federal government, the private sector and strategic investors in this country.
Mr Speaker, at the same time, rural development remains a priority, especially in the context of the socio-economic development of rural communities. It is hoped that the development of the agriculture sector and the government's emphasis on that sector can be utilised by rural residents, most of whom are farmers. I, together with the rural agencies in this state, will continue to strive to focus on strategies for rural development, not only from the physical aspect but also covering socio-economic matters, human capital development and others. For us, we develop potential and we strengthen infrastructure. I apologise if I have not been able to satisfy all parties. I apologise if there are any who have not been addressed. I ask forgiveness for everything. Whatever is good comes from Allah SWT, and whatever is bad is due to my ignorance. I apologise. I support this motion. Thank you, Mr Speaker.
Thank you, Honourable Chairman of the Committee on Agriculture, Agro-based Industry and Rural Development. Next, I invite the Right Honourable Menteri Besar.
Thank you, Honourable Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. First of all, all praise be to Allah SWT, Lord of all the worlds, and peace upon the Prophet Muhammad SAW, his family and companions, the tabi’e and tabi’in, the ulama and all mankind. May they obtain the blessings and mercy of Allah SWT on the Day of Judgement.
Alhamdulillah, after several days of sitting, God willing today is the last day of our sitting in this 14th session. During this period, various matters were raised and debated, whether by Representatives from the Perikatan Nasional government or by the opposition Pakatan Harapan. I would like to extend my highest appreciation and thanks to all Honourable Members who have given their views, suggestions and proposals to work together in advancing the state of Johor that we love so much.
For the information of all Honourable Members, all the issues raised in this august House will be given attention and acted upon as well as possible by the Johor State Government. It is indeed the vision, mission and agenda of the Johor State Government that the interests of the people are the priority. The agenda of developing the people is always given precedence in every action and decision made.
Honourable Mr Speaker, based on the schedule that has been set, all Honourable Members came to Bangunan Sultan Ismail, Kota Iskandar, to attend the Johor State Legislative Assembly Sitting. In my view, it is not merely a routine to fulfil the annual calendar. It carries a great trust placed by the people on all our shoulders. Therefore, it is a duty and responsibility that we must carry out in the name of democracy. In this context, there are 3 matters that we often celebrate and debate in this august House, namely the practice of the Democratic System, the Constitutional Monarchy System and the Economic Development Agenda. Without the practice of the Democratic System and the Constitutional Monarchy System, we cannot sit in an orderly and constructive manner. Much less to debate matters of economic affairs, which are the most important main agenda of the people that must be resolved.
As law-makers in the State Legislative Assembly, we must all study and appreciate the state constitution called the Undang-Undang Tubuh Kerajaan Johor, which was founded by the late Sultan Abu Bakar on 14 April 1895. It is here that the system of monarchical government became the main pillar in the Modern Johor Sultanate. In addition, through the democratic system, Perikatan Nasional took over the administration of the Johor State Government starting March 2020. This means that after almost a year of administering, we have to a certain extent internalised an understanding of the formation of a government and the democratic system practised, while strengthening the commitment to maintaining the sovereignty of the Constitutional Monarchy System in Johor.
Meanwhile, I would like to draw the attention of the House to the uniqueness and distinctiveness of Johor politics. For the first time in history, the Johor State Legislative Assembly has a Speaker and Deputy Speaker from different parties and political ideologies. They are not members of the ruling party, yet under the tag line “Muafakat Itu Berkat”, we can witness the democratic system running smoothly. As a result, the political consensus of the Johor people appears more mature and open. During the few days that the State Assembly sitting has been held, I am very grateful for the views and criticisms given. This is a true democratic space. We debate sincerely, presenting the best ideas and most carefully considered thoughts. In my view, the opposition is a complement and plays the role of a check and balance on the existence of a government. With permission Honourable Mr Speaker, we are here to uplift our democracy, achieving better democracy is a never ending task. It is on this thinking that we wish to give legitimacy to the opposition bloc by increasing the allocation by RM150,000.00. This increase is intended to ensure the smooth management and welfare programmes without any
hindrance in the constituencies represented by the opposition. The state government is aware that the issue related to COVID-19 is becoming more serious in the state of Johor. In view of this, an additional allocation of RM50,000.00 is given on a one-off basis to all Johor State Legislative Assembly Members. (House applauds). In this context, no one is entitled to recognise themselves as a hero or champion in strengthening the democratic system. I am of the view that whoever forms the government has the essential duty to strengthen democracy and always stand guided by its’ idea, with permission.
Honourable Mr Speaker, as at the national level, the state of Johor practises a free market economic system. Therefore, Johor holds the view that any intervention into the market, if it is not necessary and not reasonable, should not be done recklessly. Johor must also accept whatever implications, free an open economy, Johor must accept and face them as they are and as best as possible.
In the context of the welfare of the people, Johor must balance between 2 important aspects, the existence of resources and where the existing resources should be spent. Spending resources and giving them to the target groups most in need is a challenge for us. This is because the number of target groups and the type of aid or support needed also change and differ. Frankly, all parties have been affected by the spread of the COVID-19 pandemic. It does not only involve the B40 and M40 groups. But will our aid, policies and programmes continue to support these groups? Without data and without a clear understanding of poverty, we will make the wrong decisions. In the very challenging situation now, we cannot afford to let that happen. The state government also realises the increase in the unemployment rate among the people. This is due to the closure of various economic sectors because of the spread of COVID-19, and moreover the closure of borders has increased the number of unemployed. Therefore, the state government is mobilising training centres to increase training programmes and retraining among the young generation. Recognising this reality, efforts beyond the ordinary must become our practice. Understanding of the economy should no longer be the same as before the COVID-19 pandemic struck. We cannot view the economy, policies on investment and others as business as usual. The economy is a routine exercise, Honourable Mr Speaker, with permission, the economy under it’s current context is no longer fixed and certain. For example, we need to analyse the existence of the Regional Comprehensive Economic Partnership (RCEP), which has just been signed. We also need to monitor the effects of the trade war between the United States and China which has not yet subsided. Although the new President of the United States, President Joe Biden, has been elected. Both these episodes make our economy increasingly dynamic and challenging.
However, we must not give up too quickly. Allah SWT has given us the gift of mind to keep thinking, opportunities still exist as long as every economic policy of ours always remains focused. Therefore, after I took the oath as Menteri Besar of Johor, I introduced 7 Ikhtiar Makmur Johor as an exit plan from the shackles of COVID-19. So far, the Johor Food Supply Assurance Agenda, the Johor Digital Agenda and the establishment of the Johor Economic Tourism and Culture Office in Singapore are 3 ikhtiar that are being given focus as catalysts of the new economy after COVID-19. Apart from that, the Johor State Government is also striving to realise an economic thinking initiative, the Ibrahim Johor Economic Counsel. The Singapore – Johor – Riau Islands growth triangle plan (SIJOKEPRI), the New Economic Structure Plan, and the Johor Sustainable Development Plan 2030.
All these 7 ikhtiar are the result of the efforts and strategic planning of the state government to revitalise and restore the economy of Johor. Clearly, they constitute an integrated concept of an exit plan, or exit plan for the state and the Johor people. I have said before that we must focus because resources are limited, the economic context is uncertain and the people place great hope in us now. The three economic catalysts above will be driven by Private Public Partnership. The involvement of the private sector is very much needed to drive the success of all three catalysts. Meanwhile, the state government will act as a facilitator and guide so that everything that will be done will bring benefit to the people and contribute to the revenue of the Johor State Government.
Honourable Serom has also proposed to gazette an area or zone for a deep-sea fisheries industrial plan, as mentioned by the Chairman of Agro-Asas Tani. For the information of Members of the House, this ikhtiar is included in the agenda of establishing the Johor – Singapore – Riau Islands (SIJOKEPRI) growth triangle. SIJOKEPRI is a regional development area that is very strategic for the purpose of regional economic generation, by optimising the strategic position of foreign investment flows, logistics relations, natural resources and labour as well as readiness in the field of technology, namely skills and knowledge. Therefore, the proposal by Honourable Serom for the gazetting area or zone for a deep-sea fisheries industrial plan will be studied by the state government.
Honourable Mr Speaker, the state government under the leadership of Perikatan Nasional always practises an open approach. Perikatan Nasional is always open and very welcoming of views from all parties, including from the Pakatan Harapan leadership. We regard the Pakatan Harapan leaders as not strangers in the Johor state government. The Pakatan Harapan leaders are strategic partners in developing and prospering the state of Johor. As strategic partners, we greatly appreciate views even though there may be differences in thinking and ideology. However, in our conscience, we want our final destination to be the same, namely to make Johor Darul Ta’zim, the state that we love, more developed for the welfare and prosperity of its people. Johor Darul Ta’zim belongs to us. It belongs to all of us, the people of Johor. So, let us together safeguard and advance Johor Darul Ta’zim. This is our dignity, this is our homeland. It is here that we will be laid to rest. Let us make the development of this state a success out of a high sense of love for this blessed and historic land. History witnesses how the leadership of the Modern Johor Sultanate, beginning in 1855, took steps with strength, sweat and tears, and left behind its glorious legacy. The development and modernisation of Johor, for us to continue together for the present and to pass on to future generations.
Honourable Mr Speaker, alhamdulillah, we thank Allah SWT because we inherited the modern administrative system founded by the late Sultan Abu Bakar and the late Sultan Ibrahim. The modernisation of Johor was marked by the policy of making education compulsory for children aged 7 years, enforced through the Education Enactment 1902. As a result, that education policy produced many leaders in Johor. In view of this, the Johor government is committed to making Johor continue to progress, anchored on the ideas and thinking of Johor's leading figures. We intend to invite Johor figures to visit Johor Bahru to strengthen the leadership of the Johor people.
Therefore, the Institut Integriti Kepimpinan dan Latihan Semangat Dato’ Onn (IKLAS), which will be given a new brand name, namely Institut Dato’ Onn, not long from now, will aim to strengthen and implement the Johor Hikmah Programme to recognise the great contributions of leaders from Johor. This programme also aims to pool the ideas and experiences of former Menteri Besar of Johor in developing the state of Johor Darul Ta’zim. Their experience is very valuable to be shared and benefited together with the people of Johor, especially among the young. Therefore, apart from providing a platform to share ideas and experiences through the programme to be planned, all former Menteri Besar of Johor will be provided with a special officer who can assist them in facilitating various matters related to them.
Honourable Mr Speaker, the Johor Sustainable Development Plan 2030 is an inclusive and comprehensive reference document drawn up by taking into account the importance and well-being of the people as the main agenda in the State Development Plan. The Johor Sustainable Development Plan 2030 is a roadmap that is expected to drive Johor's development progressively and dynamically, based on the vision of a High-Performance State, the Bestari Johor People. Overall, this plan has 8 pillars that are used as the state government's policies in implementing development strategies that support 3 main pillars, namely Economic Sustainability, Physical Sustainability and Social Sustainability. I am confident that a paradigm shift can be made in shaping a glorious future for Johor in the near term. To make the state of Johor a high-performance state, and it is fully compatible with the concept we bring, namely Makmur Johor.
Today we are very fortunate that the Right Honourable Prime Minister of Malaysia will attend to officially launch the Book of the Johor Sustainable Development Plan 2030. Thousands of thanks to the Right Honourable Tan Sri. (House applauds).
Honourable Mr Speaker, the Johor Budget 2021, which was tabled on 26 November last, was in fact drawn up specifically to help all the people of Johor, especially in facing and dealing with the COVID-19 pandemic situation. I admit that the process of implementing all the focal points in the Johor Budget 2021 is not an easy matter. The implementation of various initiatives is expected to become increasingly challenging as a result of the uncertainty of national and global economic growth. Especially in the fields of health, economy and tourism. Our country Malaysia and especially Johor are not exempted from receiving that impact. Therefore, the tabling of the Johor Budget 2021 was drawn up and produced based on an assessment of the current needs, priorities and wishes of the people of Johor.
During the debate session, Honourable Members for Bukit Kepong, Kota Iskandar, Kukup and Pekan Nanas once raised the issue of the Johor Budget being in deficit. I would like to clarify that although the Johor Budget 2021 is a deficit budget amounting to RM248.1 million, nevertheless, I would like to inform that it was formulated based on the concept of counter cyclical measures. In this context, the Johor State Government will postpone fiscal consolidation efforts in the future, until the state economy fully recovers. However, I would like to stress that the Johor State Government has sufficient state reserve strength to cover this deficit amount. This internal strength is in the form of accumulated surplus in the Consolidated Revenue Account amounting to RM1.67 billion. That is, more than enough to implement all initiatives including departmental operating expenditure for the year 2021. However, this surplus must also be managed efficiently, effectively and prudently so that
it can be able to cover the expenditure of future budgets that are more challenging.
Honourable Mr Speaker, during the debate session, Honourable Mengkibol and Bekok also proposed that the Johor State Government establish a Committee to study the effectiveness of the Johor Budget 2021. For the information of all Honourable Members, the Office of the Deputy State Secretary of Johor (Monitoring and People's Welfare) has established key performance indicators (KPI) for all initiatives of the Johor Budget 2021. Apart from that, the state government will also expand the role and responsibilities of the Deputy State Secretary (Monitoring and Welfare Division) to ensure the effectiveness of the implementation of the Johor Budget 2021. With these KPIs, each State Committee Chairperson will take responsibility for the various initiatives under their respective portfolios and will present all outputs and outcomes to me personally in the Government Meeting Council, God willing. The Johor State Government is committed to reporting all achievements for each initiative in the Johor Budget 2021 periodically for the progress of the state and the welfare of Johor. This step can realise a dynamic, transparent, fair, efficient and effective administrative system in implementing state government policies as planned. Therefore, the effectiveness of KPIs is assessed not only in terms of management but also the impact on the people.
I would also like to clarify that all questions not answered in this winding-up speech will be discussed carefully together with the Deputy State Secretary (Monitoring and Welfare). Apart from that, I have also given written replies to the questions raised.
Honourable Mr Speaker, regarding the proposal to cut the allowances of Honourable Members to be put into the Johor State Disaster Fund as raised by Honourable Parit Yaani, Jementah and Kempas, I am of the view that we must be more realistic and must consider the long-term effects when a decision is made. Let us not be like, the high looks distant, the near is only reached later. This means that in an effort, it is the leader who is responsible and who will receive praise or blame. I do not want that, later on as a result of decisions made, my leadership team be blamed. We are not running away from responsibility but learning from examples. I appreciate the proposal that has been put forward, however, contributions to the Johor State Disaster Fund should not be motivated by a desire to attract public sympathy or be mere rhetoric. I hope that the issue of salary and allowance cuts will not be politicised. In my view, sincerity in giving or almsgiving is better than being forced to give. Let the right hand give without being known by the left hand. For the information of all, Honourable Members, up to now the total collection of the Johor State Disaster Fund is RM32.3 million. Of that amount, RM28.8 million has been spent on purchasing equipment for front liners, food assistance to COVID-19 victims, equipment at quarantine centres and so on. On this occasion I call on all Honourable Members, Non-Governmental Organisations and private companies as well as individuals to continue contributing to the account of the Johor State Disaster Fund.
Honourable Mr Speaker, as I stated previously, the Johor State Government is very committed and has a firm stand in continuing to fight for the reopening of the border between Johor and Singapore. However, I hope that all parties, especially the people of Johor, will understand that this border issue is a matter involving relations between two countries, namely involving the Malaysian government and the Singapore government. Nevertheless, the Johor State Government has always acted proactively on this issue, including taking several approaches to ensure that our people, especially those living in Johor, can return to work in Singapore.
The Johor State Government is aware of, and understands the concerns raised by Honourable Members for Tanjung Surat, Panti, Pasir Raja, Sri Medan, Tenggaroh, Kukup, Parit Yaani, Kota Iskandar, Jementah, Mengkibol and Perling. That the cross-border economy between Johor and Singapore is very important in stimulating, boosting and restoring the economy of Johor. Therefore, in June 2020 the Johor State Government proposed an SOP for the rules of entry and exit between Malaysia and Singapore through the international entry points, namely Bangunan Sultan Iskandar (BSI) and Kompleks Sultan Abu Bakar (KESAB), to the federal government. This proposed SOP was reviewed and studied by the Ministry of Foreign Affairs, the Ministry of Health, the National Security Council (MKN), the Immigration Department and relevant departments, which was brought into negotiations with the Singapore government. As a result, Malaysia and Singapore agreed to implement two schemes, namely the Periodical Commuting Arrangement (PCA), for work purposes, and the Reciprocal Green Lane (RGL) for business purposes. The implementation of both these schemes received a good response. Up to 14 November 2020, the number using these schemes is 14,768 persons. The success and good response received following the implementation of both these schemes has proven that the initiatives undertaken by the Johor State Government together with the federal government are able to provide benefits to Malaysians who work in Singapore.
As a result of the success of implementing these two schemes, the Johor State Government is working to apply for the reopening of the Malaysia and Singapore border for the purpose of daily commuting, namely the Daily Commuting Arrangement (DCA). The Johor State Government recommended the SOP for the DCA scheme to the Ministry of Foreign Affairs on 26 October 2020 and 9 November 2020. If it can be implemented, the SOP will be presented at a Special Session of the National Security Council before being brought to negotiate with the Singapore government. At the initial stage, the introduction of the DCA SOP focuses on the categories of workers and students. Workers, students and parents of students can enter and exit Johor and Singapore. To ensure that the DCA scheme can be implemented effectively, the Johor State Government has prepared the capacity for between 10,000 and 30,000 swab tests to be carried out every day. This is the result of cooperation with private laboratories accredited by the Institute for Medical Research. For the information of Honourable Members, the issue of opening the border between Johor and Singapore is within the jurisdiction of the federal government. However, the Johor State Government is very concerned and mindful of the welfare of the people as a whole. These efforts also prove that the Johor State Government is always striving and committed to ensuring that the efforts to open the border can be realised without neglecting the interests of public health and safety.
Honourable Mr Speaker, on this auspicious morning, I am pleased to inform that the Right Honourable Prime Minister, Tan Sri Muhyiddin Yassin, has agreed to provide a special grant amounting to RM30 million to ease the burden of vulnerable groups affected by COVID-19 in the state of Johor. (House applauds). Thank you, Right Honourable Prime Minister. Honourable Bukit Gambir cannot give, the Prime Minister can. Thank you, Right Honourable.
Honourable Mr Speaker, regarding the participation of Opposition State Assembly Members (ADUN) in the District Development Action Committee, I would like to inform Honourable Members Penggaram, Skudai, Tangkak, Paloh and Serom, who raised the issue of the participation of Opposition ADUN in the District Development Action Meeting, that the Johor State Government welcomes the concern and sincerity of Honourable Members from the opposition bloc in giving views and suggestions for improvement to ensure that the welfare and economic agenda of the people becomes a priority. Moreover, in the situation of the COVID-19 pandemic which still has no end in sight. For the information of Honourable Members of the House, the source of authority for the implementation of the District Development Action Committee Meeting is based on Directive No. 1/2020, the Mechanism for Coordinating the Implementation of National Development of the Prime Minister's Department of Malaysia, which took effect from 1 January 2020. This JTPD replaces the District Action Working Committee. Among the functions of the District Development Action Committee are to monitor and evaluate the impact of the implementation of development programmes and projects, coordinate development issues as well as the e-Kasih poverty eradication programme. In line with Directive No. 1 2020 as the source of authority for the establishment of JTPD, there is no directive to invite Opposition ADUN to attend the said meeting. This directive was also applied during the time when Pakatan Harapan administered the previous state government. Paragraph 5 of the same directive clearly states that any changes to the membership of the Council and Committees must be agreed by the Right Honourable Prime Minister and this is not within the jurisdiction of the state government. Administrative members involved in the Council and Committees under Directive No. 1 2020 will always ensure that the implementation of government affairs is carried out efficiently and effectively. At the same time, I would like to stress that all issues and problems arising will be resolved through this platform regardless of political differences. Accordingly, the Johor State Government is prepared to consider this matter and will raise the proposal to the federal government level. Insya-Allah.
Now in Johor we depend greatly on it because our approach, manner and political culture are very compatible with the tagline ‘Muafakat Itu Berkat’. This is highlighted by the courtesy and eloquence of debate among Honourable Members. This is coupled with the wisdom of Honourable Mr Speaker in conducting the House sitting in an orderly manner and in engaging all Members of the House to take part in the debate.
Honourable Mr Speaker, I would also like to respond to the proposal of Honourable Jementah, Skudai, Mengkibol, Bekok and Paloh to establish a Select Committee at the State Legislative Assembly level on certain issues or matters. I have no objection to that proposal because it is one of the ways or methods of obtaining the best results that can meet the interests and welfare of the people of this state. For the purpose of such establishment, the matter will be considered and must be implemented based on the State Constitution, namely the Undang-Undang Tubuh Kerajaan Negeri. At the same time, the state government is taking the initiative to appoint ten Research Officers who will play a role in assisting State Legislative Assembly Members, including those from the opposition. These Research Officers will conduct research related to the management of the State Legislative Assembly, thereby improving the administration of the House and making debates more dynamic.
The Johor State Government warmly welcomes and at the same time supports the Regional Economic Corridor Development Projects such as Iskandar Malaysia and the East Coast Economic Region (ECER) in further boosting economic growth in a region or area. The development projects and programmes of Iskandar Malaysia focus more on three districts, namely Johor Bahru, Kulai and Pontian, through various investments in identified sectors. Meanwhile, the eastern region of the state of Johor, namely Mersing, is also part of the region in the ECER Development Programme. The East Coast Economic Region has so far succeeded in attracting investors' interest in the tourism and agriculture sectors with total investment amounting to RM1.61 billion in the Mersing district alone. Following this success, ECER plans to expand its area through the implementation of the ECER 2.0 Master Plan which involves the district of Segamat as announced by the federal government previously. This area is planned by the state government to focus on the agricultural sector and thereby realise the Food Supply Assurance Agenda initiative. Therefore, the Johor government requests that the process of declaring Segamat as a new ECER region be carried out expeditiously at the federal government level. I believe that with the concern of the Right Honourable Prime Minister, the process of incorporating the district of Segamat into the ECER corridor development can drive economic growth in that district.
Honourable Mr Speaker, Honourable Members Buluh Kasap, Tangkak, Skudai, Jementah, Mengkibol, Pekan Nenas, Bukit Batu, Penawar and Yong Peng also raised the issue of abandoned land and questioned the government's action against lands that have breached conditions. The Johor State Government very much welcomes the various views and proposals put forward regarding ways to overcome the issue of abandoned land. I would also like to share the same issue because the existing land should ideally be cultivated in a way that benefits the socio-economic level of the people, as emphasised in the focal points for the development of the agricultural sector. I am of the view that the optimal use of natural assets such as land is important to produce a significant impact on the total output of agricultural products in Johor. However, the Johor State Government views this issue of abandoned land collectively and takes into account the main factors why the issues of abandoned land have occurred. Among the factors identified are the location of the land being far from residential areas, land owned by many owners under one title, thirdly factors of locality and the topography of the land. Fourthly, the ability of landowners to provide the initial capital to cultivate the land and various other factors. Taking into account the direction of the Johor State Government which emphasises the Food Supply Assurance Agenda, abandoned land or agricultural land can therefore be included in the food investment zone programme, the food crop zone programme and also the Food Production Permanent Park Project.
The Johor State Government also takes note and will take further action on the above matters so that large-scale agricultural projects on land that has breached the express condition of the land by planting commodity crops such as oil palm plantations. For the information of the House, in 2020 initiatives to address the abandoned land development programme amounting to RM725,000.00 were channelled through federal and state government allocations. It aims to develop abandoned land measuring 59.48 hectares which benefits 21 applicants. To make this effort a success, the state government will strengthen the development of abandoned land by implementing the Food Supply Assurance Agenda including the Community Garden and Urban Garden Programme. These initiatives are in line with the state government's efforts to make the agricultural sector a new catalyst of economic resources.
The Honourable Member. Please proceed.
Thank you, Mr Speaker. The Honourable Member for Kukup, Buluh Kasap, Tanjung Surat, Jementah and Senggarang has also raised the issue of water pollution and the monitoring methods implemented to ensure that water quality is always in good condition and that the water treatment plants operate without disruption. Preventive measures have already been implemented by the state government through the installation of water quality monitoring stations to facilitate the detection of pollutants, including ammonia, iron, nitrates, oil and turbidity, before the water concerned is treated at the water treatment plants. Clearly, we need to learn from the experience of other states, which often experience water supply disruptions due to river water pollution. Since 2017, the Johor Water Regulatory Body (BAKAJ) has installed three water quality monitoring units in the Johor river basin, namely at the Sayong River, Semanggar River and Johor River. The installation of this equipment has helped control pollution in the Johor River. As a result, reports of plant shutdowns by Ranhill SAJ have also decreased. In fact, in 2020 no related reports along the Johor River were recorded by Ranhill SAJ. Consequently, the operation and management of the treatment plants can be carried out efficiently and effectively for the welfare of the people of Johor. Following the effectiveness of this water quality monitoring equipment, BAKAJ plans to install three more monitoring units at the Ulu Benut River, Skudai River and Muar River. The state government is determined to provide the best service to the people of Johor.
For the information of this august House, BAKAJ also uses geospatial technology combined with a light detection and ranging system. This system is then integrated with a Geographic Information System. If the source of pollution is identified, legal action will be taken against the party responsible for the pollution under Section 7A of the Water Enactment 1921 as amended in 2014, which provides for a fine of up to RM500,000.00. Meanwhile, the maximum compound amount that may be imposed is up to RM250,000.00.
I also wish to refer to the question raised by the Honourable Member for Senggarang regarding the decline in forest produce collection, which is only around RM7 million a year. We have identified that the decline in this collection is influenced by several factors. Among them is the reduction in Permanent Forest Reserve areas opened for logging. Following the decision of the state government at the State Executive Council meeting on 5 November 2014 to freeze the approval of new logging quotas in Permanent Forest Reserves. This was followed by the decision of the government through the State Executive Council meeting on 1 April 2020 to cancel the entire remaining logging area that had been approved by the Logging Tender Board. The decline in forest produce was also influenced by the enforcement of the Movement Control Order due to the COVID-19 pandemic which began in early 2020. Therefore, logging activities, including timber extraction, were not permitted, in addition to rainy weather conditions which prevented timber extraction from licensed areas.
For the information of Members, from June 2020 until now, the Forestry Department has fully cooperated with the enforcement agencies to verify these allegations, namely the Malaysian Anti-Corruption Commission (SPRM) Johor branch as well as the SPRM headquarters in Putrajaya. In addition to the investigations conducted by the Enforcement Division and the Integrity Unit of the Headquarters of the Forestry Department of Peninsular Malaysia.
As a result, the state government found that all these allegations were found to be baseless and defamatory.
Honourable Member, Mr Speaker, regarding the development of the town of Sedili raised by the Honourable Member for Sedili. The Johor Rakyat Infrastructure Group has prepared a proposal study paper dated 4 July 2017 together with the Kota Tinggi District Council. A coordination and action process was carried out by establishing a Sedili Town Development Committee involving several government agencies. However, the Johor state government under my leadership is always committed to developing all corners of the state of Johor, particularly focal areas involving the investment, tourism, economic development and social development sectors. Given that Sedili is rich in intellectual historical value, the Local Authority may collaborate with several parties, including the Johor Writers' Association, to produce quality works to further elevate the name of Sedili and Kota Tinggi as historic districts. Moreover, one of the National Laureates, the late Dato' Dr. Usman Awang, also originated from Sedili.
Honourable Member, Mr Speaker. Before concluding this speech, I wish to extend my appreciation and thanks for the support of the Honourable Members and all the civil servants of the Johor state government. My EXCO colleagues and the Johor civil servants and I pledge to continue striving to provide the best service to the people and the state of Johor. Let us stand shoulder to shoulder: what the mountain is climbed together, what the valley is descended together, what is heavy is carried together, what is light is carried together. So that Johor may become increasingly prosperous and together we may overcome and tackle the post-COVID-19 pandemic. Let us move forward in step and work together so that we can restore the prosperity of the state of Johor and bring development founded on the welfare of the people of Johor. As the closing of the debate on the Johor Budget 2021, I would like to remind everyone that there are 12 Key Welfare, Empowerment and Achievement Agendas, in addition to 3 new economic catalysts, which include the Johor State Food Security Assurance Agenda or Johor Food Security, the Johor Digital Agenda and the establishment of the Johor Economic Tourism And Culture Office in Singapore. I hope all the Honourable Members can think more rationally and openly. We can share ideas and reach mutual understanding in determining policies that impact the welfare of the people and not for individuals who often look askance at the efforts of the government today.
Let us set aside all differences to ensure that we are able to contribute to raising Johor's standing as the best state in this country and at the same time succeed in curbing the wave of the COVID-19 pandemic occurring today. With the blessings of the two taglines of the Modern Johor Sultanate, based on Article 61 of the Johor State Constitution, namely "Kepada Allah Berserah" and "Muafakat Itu Berkat", insya-Allah the state of Johor will succeed in overcoming current challenges and achieving glorious success in the future. Indeed Johor remains number #01, contributing to the high civilisation of the Johor people at the national and global levels. As the closing of this debate, allow me to offer the following pantun:
The state of Johor, the southernmost state, a beautiful state beyond description, the people of Johor with firm memory, Muafakat Johor becomes the adornment.
Thank you. Wabillahitaufik walhidayah, Assalamualaikum warahmatullahi wabarakatuh.
Thank you, congratulations to the Honourable Menteri Besar. On behalf of the House, I thank you most sincerely for your support in empowering the House. After this, the Launch Ceremony of the Johor Sustainable Development Plan 2030 Book will be officiated by the Honourable Prime Minister. After this, in the foyer of the Johor Assembly Hall, all the Honourable Members are invited to attend. I suspend this sitting until 2.30 pm. Thank you.
The sitting was suspended at 1.13 pm.
The sitting resumed at 2.30 pm.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, the mercy of Allah and His blessings, and greetings of well-being. The motion before this House is that the Supply (2021) Enactment Bill 2020 be read a second time now.
Those who agree, please raise your hands; those who do not agree, the Bill is read a second time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for the services for the year 2021 and to appropriate that money for the services for that year.
The House resolves itself into a Committee.
JADUAL.
The matter before this Committee is the sum of RM1,401,000.00 for Head of Expenditure B.01, Public Service Commission, that this shall form part of this Schedule.
For Supply Purpose B.01, the allocation of RM1,401,000.00 is required for the office management of the Public Service Commission. Of this total, RM933,000.00 is required for the payment of emoluments and allowances to the members of the department, and the balance of RM468,000.00 is for other management expenditure.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM152,229,000.00 for Head of Expenditure B.03, Office of the State Secretary, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.01, the allocation of RM1,401,000.00 is required for the office management of the Public Service Commission. Of this total, RM933,000.00 is required for the payment of emoluments and allowances to the members of the department, and the balance of RM468,000.00 is for other management expenditure.
Just a moment, take a breath, Honourable Member.
Sorry, Mr Chairman.
Cool, cool, relax. (House laughs) Carry on.
The Honourable Member, Mr Chairman, for Supply Purpose B.03, Office of the State Secretary, the allocation of RM152,229,000.00 is required for the management and administrative expenditure of the offices under the control of the Office of the State Secretary in implementing the government programmes and activities to develop and improve the standard of living of the people of the state of Johor. The allocation required for each activity is as follows: Management Division, RM32,302,000.00; Miscellaneous Services, RM38,568,000.00; Menteri Besar Johor, RM14,498,000.00; Johor State Economic Planning Unit, RM7,641,000.00; Johor State Legislative Assembly, RM19,814,000.00; Johor Water Regulatory Body (BAKAJ), RM5,434,000.00; Internal Audit, RM1,261,000.00; Grants to Agencies, RM17,500,000.00; Sultan Ibrahim Camp, RM15,211,000.00.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM30,571,000.00 for Head of Expenditure B.03, Office of the State Secretary, that this shall form part of this Schedule.
Peace be upon you, the mercy of Allah and His blessings. Greetings of well-being. Thank you, Mr Chairman. For Supply Purpose B.03, Office of the State Secretary, a sum of RM30,571,000.00 is provided for the implementation of the following activities: Science, Technology and ICT Division, RM18,421,000.00; Culture, RM12,150,000.00. Thank you.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM23,230,000.00 for Head of Expenditure B.03, Office of the State Secretary, that this shall form part of this Schedule.
Mr Chairman, for Supply Purpose B.03, Office of the State Secretary, a sum of RM23,230,000.00 is provided for the implementation of the following activities: Local Government Division, RM13,261,000.00; Housing Division, RM8,168,000.00; Landscape Office, RM1,801,000.00.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM7,000,000.00 for Head of Expenditure B.03, Office of the State Secretary, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, an allocation totalling RM7,000,000.00 is provided under Supply Purpose B.03, Office of the State Secretary, for management and administrative expenditure under the Women and Family Affairs Division.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM27,596,000.00 for Head of Expenditure B.03, Office of the State Secretary, that this shall form part of this Schedule.
Mr Chairman, for Expenditure Purpose B.03, Office of the State Secretary, a sum of RM27,596,000.00 is provided for the implementation of the following activities: Rakan Muda and Sports, RM25,500,000.00; Tourism Johor, RM2,096,000.00.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM11,183,000.00 for Head of Expenditure B.03, Office of the State Secretary, that this shall form part of this Schedule.
Mr Chairman, for Supply Purpose B.03, Office of the State Secretary, a sum of RM11,183,000.00 is provided for the implementation of the following activities: Human Resource Management Division, RM9,582,000.00; Invest Johor, RM1,601,000.00. Thank you.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM15,838,000.00 for Head of Expenditure B.04, State Treasury, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.04, the allocation of RM15,838,000.00 is required for the management and administration of the State Treasury. Of this total, RM7,351,000.00 is allocated for emoluments expenditure, RM2,976,000.00 for Services and Supplies Expenditure, RM210,000.00 for the acquisition of assets, RM301,000.00 for Grants and Fixed Charges Expenditure, and the balance of RM5,000,000.00 for Revenue Refunds and Write-offs expenditure.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM20,814,000.00 for Head of Expenditure B.07, Department of Agriculture; RM76,038,000.00 for Head of Expenditure B.08, Irrigation and Drainage Department; RM11,991,000.00 for Head of Expenditure B.10, Veterinary Services Department, that these shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.07, the allocation of RM20,814,000.00 is required for the management of the Department of Agriculture. Of this total, RM15,753,000.00 is required for the payment of emoluments and allowances to the members of the department, and the balance of RM5,061,000.00 is for other management expenditure.
Under Supply Purpose B.08, Irrigation and Drainage Department, the allocation required is totalling RM76,038,000.00. An amount of RM28,880,000.00 is provided for emoluments expenditure. RM46,244,000.00 is required for services and supplies, including the operation and maintenance of rivers, RM470,000.00 is provided for the acquisition of departmental assets, and RM444,000.00 is provided for grants and fixed charges, including payment in lieu of leave for retired members of the department.
Under Supply Purpose B.10, Veterinary Services Department. An allocation of RM11,991,000.00 is required for the administrative and management expenditure of the Veterinary Services Department, including staff emoluments, and for carrying out management tasks relating to animals as well as to enhance the advancement of the livestock industry throughout this state.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM6,530,000.00 for Head of Expenditure B.12, Royal Johor Flower Garden Office, and RM4,871,000.00 for Head of Expenditure B.13, Town and Rural Planning Department, that these shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.12, the allocation totalling RM6,530,000.00 is required for the management expenditure of the Royal Johor Flower Garden Office. The allocation of RM4,871,000.00 under Supply Purpose B.13 is for the Town and Rural Planning Department to carry out tasks of controlling physical development, coordinating physical planning and preparing local plans.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM17,678,000.00 for Head of Expenditure B.19, Forestry Department, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.19, the allocation of RM17,678,000.00 is required for the management and administrative expenditure of the Forestry Department. Of this total, RM14,093,000.00 is emoluments expenditure, while the balance of RM3,585,000.00 is for other expenditure including departmental services and supplies, assets, and grants and fixed charges.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee is the sum of RM260,048,000.00 for Head of Expenditure B.21, Islamic Affairs Department, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.21, Islamic Affairs Department, the allocation of RM260,048,000.00 is required to implement Islamic religious activities in efforts to uphold the glory of Islam, including management expenditure under Islamic Religious Education and assistance to Arabic schools and the people's religious schools KAFA. The allocation required for each activity is as follows: Islamic Affairs Department, general administration, RM59,382,000.00. Islamic Religious Education, RM200,666,000,00.
The matter is put forward for decision. Those who agree, please raise your hands; those who do not agree, the matter is agreed.
The matter before this Committee, namely the sum of RM34,727,000.00 for Head of Expenditure B.23, Social Welfare Department, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.23, Social Welfare Department, the allocation required in 2021 is RM34,727,000.00. Of this total, RM4,939,000.00 is required for the payment of emoluments to the members of the department. RM2,640,000.00 for services and supplies expenditure. RM180,000.00 for the acquisition of assets, and the balance of RM26,968,000.00 for grants and fixed charges expenditure, which are welfare assistance and contributions to individuals and the community. This includes assistance to poor residents and disaster relief such as for floods.
The matter before this Committee, namely the sum of RM83,855,000.00 for Head of Expenditure B.24, Public Works Department, that this shall form part of this Schedule.
The Honourable Member, Mr Chairman, for Supply Purpose B.24, Public Works Department (JKR), the funds required for the year 2021 amount to RM83,855,000.00. Of this total, RM53,494,000.00 is required for payment of emoluments to the department's staff. RM28,824,000.00 is for expenditure on services and supplies. RM440,000.00 is for acquisition of assets. RM1,077,000.00 is for grants and fixed charges expenditure, while the balance of RM20,000.00 is required to cover the department's other expenses. Thank you.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree, the matter is agreed to.
The matter before this Committee, namely the sum of RM5,513,000 for Head of Expenditure B.26, Abu Bakar Royal Museum, Istana Besar Johor, is to form part of this Schedule.
The Honourable Member, Mr Chairman, under Supply Purpose B.26, Abu Bakar Royal Museum, Istana Besar Johor, the funds required amount to RM5,513,000.00. Of this sum, RM2,920,000.00 is emoluments expenditure, while the balance of RM2,593,000.00 is for other expenditure including departmental services and supplies, assets, and fixed charges. Thank you.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree, the matter is agreed to.
The matter before this Committee, namely the sum of RM860,000.00 for Head of Expenditure B.28, Contribution to Statutory Funds, is to form part of this Schedule.
The Honourable Member, Mr Chairman, under Supply Purpose B.28, the funds amounting to RM860,000.00 are required for Contribution to Statutory Funds. This sum is required for contributions to the Development Fund and the other Funds under Section 10.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree, the matter is agreed to.
The matter before this Committee, namely the sum of RM11,861,000.00 for Head of Expenditure B.29, Syariah Judicial Department; RM2,854,000.00 for Head of Expenditure B.32, Mufti Department; and RM2,513,000.00 for Head of Expenditure B.33, Syariah Prosecution Department, is to form part of this Schedule.
The Honourable Member, Mr Chairman, under Supply Purpose B.29, the sum of RM11,861,000.00 is provided for the management and administrative expenditure of the Syariah Judicial Department for the year 2021. Of this total, RM6,677,000.00 is provided for emoluments expenditure, RM4,062,000.00 for services and supplies expenditure, RM1,034,000.00 for acquisition of assets, and RM88,000.00 for grants and fixed charges expenditure.
Under Supply Purpose B.32, the sum of RM2,854,000.00 is provided for the management and administrative expenditure of the Mufti Department.
Under Supply Purpose B.33, the sum of RM2,513,000.00 is provided for the management and administrative expenditure of the Syariah Prosecution Department.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree, the matter is agreed to.
The matter before this Committee, namely the sum of RM5,044,000.00 for Head of Expenditure B.41, Johor Bahru District Office; RM6,055,000.00 for Head of Expenditure B.42, Muar District Office; RM5,542,000.00 for Head of Expenditure B.43, Batu Pahat District Office; RM 4,764,000.00 for Head of Expenditure B.44, Pontian District Office; RM4,951,000.00 for Head of Expenditure B.45, Segamat District Office; RM4,540,000.00 for Head of Expenditure B.46, Kluang District Office; RM4,846,000.00 for Head of Expenditure B.47, Kota Tinggi District Office; RM3,962,000.00 for Head of Expenditure B.48, Mersing District Office; RM3,553,000.00 for Head of Expenditure
B.49, Kulai District Office; RM3,437,000.00 for Head of Expenditure B.50, Tangkak District Office, is to form part of this Schedule.
The Honourable Member, Mr Chairman, under Supply Purpose B.41, Johor Bahru District Office, is allocated RM5,044,000.00. Under Supply Purpose B.42, Muar District Office, is allocated RM6,055,000.00. Under Supply Purpose B.43, Batu Pahat District Office, is allocated RM5,542,000.00.00. Under Supply Purpose B.44, Pontian District Office, is allocated RM4,764,000.00. Under Supply Purpose B.45, Segamat District Office, is allocated RM4,951,000.00. Under Supply Purpose B.46, Kluang District Office, is allocated RM4,540,000.00. Under Supply Purpose B.47, Kota Tinggi District Office, is allocated RM4,846,000.00. Under Supply Purpose B.48, Mersing District Office, is allocated RM3,962,000.00. Under Supply Purpose B.49, Kulai District Office, is allocated RM3,553,000.00, and under Supply Purpose B.50, Tangkak District Office, is allocated RM3,437,000.00. All these allocations are provided for the management and administrative expenditure of the district offices throughout the state of Johor.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree, the matter is agreed to.
The matter before this Committee is the sum of RM30,854,000.00 for Head of Expenditure B.51, Land and Mines Office; RM7,131,000.00 for Head of Expenditure B.52, Johor Bahru Land Office; RM5,283,000.00 for Head of Expenditure B.53, Muar Land Office; RM6,295,000.00 for Head of Expenditure B.54, Batu Pahat Land Office; RM3,719,000.00 for Head of Expenditure B.55, Pontian Land Office; RM5,151,000.00 for Head of Expenditure B.56, Segamat Land Office; RM4,895,000.00 for Head of Expenditure B.57, Kluang Land Office; RM4,988,000.00 for Head of Expenditure B.58, Kota Tinggi Land Office; RM3,559,000.00 for Head of Expenditure B.59, Mersing Land Office; RM3,346,000.00 for Head of Expenditure B.60, Kulai Land Office; RM3,603,000.00 for Head of Expenditure B.61, Tangkak Land Office, is to form part of this Schedule.
The Honourable Member, Mr Chairman, under Supply Purpose B.51, Land and Mines Office, is allocated RM30,854,000.00. Under Supply Purpose B.52, Johor Bahru Land Office, is allocated RM7,131,000.00. Under Supply Purpose B.53, Muar Land Office, is allocated RM5,283,000.00. Under Supply Purpose B.54, Batu Pahat Land Office, is allocated RM6,295,000.00. Under Supply Purpose B.55, Pontian Land Office, is allocated RM3,719,000.00. Under Supply Purpose B.56, Segamat Land Office, is allocated RM5,151,000.00. Under Supply Purpose B.57, Kluang Land Office, is allocated RM4,895,000. Under Supply Purpose B.58, Kota Tinggi Land Office, is allocated RM4,988,000.00, and under Supply Purpose B.59, Mersing Land Office, is allocated RM3,559,000.00. Under Supply Purpose B.60, Kulai Land Office, is allocated RM3,346,000.00, and under Supply Purpose B.61, Tangkak Land Office, is allocated RM3,603,000.00. All these allocations are provided for the management and administrative expenditure of the land offices throughout the state of Johor.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The matter is agreed to.
The Schedule forms part of this Bill.
FASAL 2.
The matter before this Committee is that Clause 2 form part of this Bill.
Those Members who agree, please raise your hands; those who do not agree, Clause 2 is agreed to form part of this Bill.
FASAL 1.
The matter before this Committee is that Clause 1 form part of this Bill.
Those Members who agree, please raise your hands; those who do not agree, Clause 1 is agreed to form part of this Bill.
The State Assembly resumes sitting.
Mr Speaker, I would like to inform the House that this Bill has already been considered in the Committee clause by clause and agreed to without amendment. I therefore move that this Bill be read a third time and passed now.
Mr Speaker, I second the motion.
The motion before the House is that the Bill entitled Supply (2021) Enactment 2020 be read a third time and passed now.
The motion is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. This Bill is read a third time and passed.
Be it hereby enacted by the Johor State Assembly as follows:-
This Enactment may be cited as the Supply (2021) Enactment 2020 and shall come into operation on 1 January 2021.
Johor State Development Expenditure Estimates 2021.
Mr Speaker, I would like to move that this House immediately resolve itself into a Committee of the whole State Assembly to consider the estimate of Johor State Development Expenditure for 2021, which was tabled as Meeting Paper No. 36 of 2020, and to determine whether the estimate should be approved by this House with or without amendment.
Mr Speaker, the funds required for the Development Estimate for 2021 amount to RM850,000,000 under four (4) Committees as follows:-
1. Johor State Natural Resources, Administration, Finance, Planning and Economic Development Committee – RM632,040,000.00.
2. Johor State Agriculture, Agro-Based Industry and Rural Development Committee – RM43,000,000.00.
3. Johor State Islamic Religious Affairs Committee – RM65,960,000.00.
4. Johor State Public Works, Transport and Infrastructure Committee – RM109,000,000.00.
Further explanation of these allocations will be given at the respective Committee stage.
Mr Speaker, I second the motion.
The motion is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The motion is agreed to.
The House resolves itself into a Committee.
The matter before this Committee, namely the sum of RM270,000,000.00 for Head of Expenditure P.70, Office of the Menteri Besar of Johor; RM280,330,000.00 for Head of Expenditure P.71, Office of the State Secretary (Development); and RM81,710,000.00 for Head of Expenditure P.72, Office of the State Secretary (Management), is agreed to.
Under Development Purpose 70, Office of the Menteri Besar of Johor, the sum of RM270,000,000.00 is provided for the year 2021. Of this total, RM206,000,000.00 is required for development works including Physical Development, Social Development and Minor Works Development. RM14,000,000.00 is provided for land acquisition expenditure for public facilities development projects, while the remaining RM50,000,000.00 is provided for District Special Projects throughout the state of Johor.
Under Development Purpose 71, Office of the State Secretary (Development), the sum of RM280,330,000.00 is provided for the year 2021. RM37,800,000.00 is provided for Economic and Inclusive Development Projects. A sum of RM63,000,000.00 is allocated for Housing and Local Government Development Projects. Apart from that, RM16,350,000.00 is provided for projects under Agriculture and Agro-Based Industry. For Human Capital, Family and Community Development, a sum of RM13,327,000.00 is allocated. For the implementation of projects relating to Natural Resources and Environment Management, a sum of RM71,107,000.00 is provided, while RM17,446,000.00 is provided for Science, Technology and Innovation development. RM15,000,000.00 is provided for Youth and Sports development programmes. For the promotion of tourism activities in the state of Johor, an allocation of RM18,300,000.00 is provided. Lastly, RM28,000,000.00 is provided for Infrastructure and Public Facilities.
Under Development Purpose 72, Office of the State Secretary (Management), the sum of RM81,710,000 is provided for the year 2021. RM50,120,000.00 is provided for maintenance, repair and upgrading works of government quarters and state buildings, state government-owned buildings outside Johor, and government buildings at the State Government Administrative Centre, Kota Iskandar, as well as the Kota Iskandar Mosque. In addition, RM7,000,000.00 is provided for payments related to Kota Iskandar. RM9,565,000.00 is provided for the construction of state government buildings, RM15,000,000.00 is provided for Minor Works, and lastly RM25,000.00 is provided for Enforcement Vehicles.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The matter is agreed to.
The matter before this Committee, namely the sum of RM65,960,000.00 for Head of Expenditure P.73, Islamic Religious Affairs Department, is agreed to.
Under Development Purpose 73, Islamic Religious Affairs Department, the sum of RM65,960,000.00 is provided for the year 2021. A sum of RM4,800,000.00 is provided for the Iskandar Islamic Centre, Johor, and RM44,798,000.00 for the development of religious schools throughout the state of Johor as well as the Johor State Islamic Education Office. An allocation of RM4,160,000.00 is provided for enforcement vehicles and machinery, equipment for government mosques, implementation of planned works to build quarters for officers, religious teachers and staff of the Johor State Islamic Religious Affairs Department. A further allocation of RM1,900,000.00 is for equipment and facilities at the Royal Mausoleum and cemeteries. An allocation of RM10,302,000.00 is provided for building and beautifying Johor mosques, the buildings of the Johor State Islamic Religious Affairs Office, the buildings of the Johor State Syariah Courts, and the buildings of the Johor Mufti Department.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The matter is agreed to.
The matter before this Committee, namely the sum of RM109,000,000.00 for Head of Expenditure P.74, Public Works Department, is agreed to.
The Honourable Member, Mr Chairman, under Development Purpose 74, Public Works Department, the sum of RM109,000,000.00 is provided for the year 2021. A sum of RM53,439,700.00 is required for construction, upgrading and improvement of state roads and bridges, and a sum of RM2,535,000.00 for widening state roads, building riverbank walls and flood mitigation plans.
An allocation of RM2,732,100.00 is also provided for upgrading mechanical and electrical systems in government buildings, and RM2,670,000.00 for other minor works. A sum of RM3,520,000.00 is provided for construction, upgrading and renovation of government buildings in the state of Johor. For upgrading key government buildings and building facilities and requirements, a sum of RM4,508,000.00 is provided as an allocation.
A sum of RM37,022,300.00 is provided for state buildings, while RM1,882,900.00 is for the Johor Heritage Foundation Building. Lastly, RM690,000.00 is provided for Vehicles and Machinery.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The matter is agreed to.
The matter before this Committee, namely the sum of RM43,000,000.00 for Head of Expenditure P.75, Irrigation and Drainage Department, is agreed to.
The Honourable Member, Mr Chairman, for Development Purpose P.75, Irrigation and Drainage Department, the sum of RM43,000,000.00 is provided to implement projects for the year 2021. Of this total, RM7,308,000.00 is for machinery, vehicles, plants and sluice gates as well as equipment, and RM1,650,000.00 is provided for the Department's premises and buildings. A sum of RM2,285,000.00 is provided for project studies and design. In addition, RM23,225,000.00 is provided for flood mitigation plans, environmentally friendly drainage, coastal zones and river basins. A sum of RM6,260,000.00 is provided for water resource and hydrology management. The development of irrigation infrastructure, agricultural drainage and agro-based infrastructure as well as river mouths throughout the state of Johor, and lastly a sum of RM2,272,000.00 is provided for dam safety management as well as crossings and estate roads.
The matter is put forward for decision, Those Members who agree, please raise your hands; those who do not agree. The matter is agreed to.
The Honourable Member, Mr Chairman, since the estimate matters stated in Meeting Paper No. 36 of 2020 have now been fully considered, I move that the resolutions of the Committee be immediately reported to the State Assembly.
The matter is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The matter is agreed to.
The State Assembly resumes sitting.
Mr Speaker, I would like to inform the House that the House Committee has considered and approved, without amendment, the estimates stated in Meeting Paper No. 36 of 2020. I therefore move that this House agree to the resolutions of the Committee, namely that the sum of RM850,000,000.00 proposed for the development expenditure estimate for the year 2021 be approved by this State Assembly, and accordingly resolve that a sum not exceeding RM850,000,000.00 shall be spent from the Development Fund in the Financial Year 2021 to carry out the purposes stated in the said Meeting Paper.
Mr Speaker, I second the motion.
The motion is put forward for decision. Those Members who agree, please raise your hands; those who do not agree. The motion is agreed to.
Supplementary Appropriation (No. 3) Enactment Bill for Year 2020.Bill
Mr Speaker, I would like to move that the Bill entitled Supplementary Supply (No. 3) Enactment 2020 be read a first time.
Mr Speaker, I second the motion.
This Bill is read a first time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for supplementary expenditure on services for the year 2020, and to allocate that money for certain specified purposes.
Mr Speaker, I would like to inform the House that I will move the motion for the second reading of this Bill today, and I move that Standing Order 112 (2) be suspended temporarily so that consideration of this Bill at its other stages may be completed today.
Mr Speaker, I second the motion.
The motion is put forward for decision. Those Members who agree, please raise your hands; those who do not agree, Standing Order 112 (2) is suspended temporarily.
The Honourable Member, Mr Speaker, I move that this Bill be read a second time now. This additional allocation is the third supplementary allocation for the 2020 supply expenditure.
The additional allocation required is RM17,230,000.00, as provided in the Supplementary Supply Enactment under 4 Committees as follows:
1. Committee on Natural Resources, Administration, Finance, Planning and Economic Development of the State of Johor, RM15,005,000.00.
2. Committee on Agriculture, Agro-based Industry and Rural Development of the State of Johor, RM1,129,000.00.
3. Committee on Islamic Religious Affairs of the State of Johor, RM216,000.00.
4. Committee on Women, Family and Community Development of the State of Johor, RM880,000.00.
Further explanation of these additional allocations will be given at the relevant Committee stage.
The Honourable Member, Mr Speaker, I support this motion.
The question before this House is that this Bill be read a second time now.
Honourable Members who agree, please raise your hands. Those who do not agree, the Bill is read a second time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure for services for the year 2020 and to appropriate that money for specific purposes.
The House in Committee.
JADUAL.
The matter before this Committee is the sum of RM173,000.00 for Expenditure Head B.03, State Secretary's Office, to form part of this Schedule.
The Honourable Member, Mr Chairman, for the Supply Purpose B.03, State Secretary's Office, Management Division, an additional allocation of RM173,000.00 is required to cover the shortfall in repaying the COVID-19 Special Assistance payments that were advanced by the State Finance Office.
The matter is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, the matter is agreed to.
The matter before this Committee is the sum of RM1,129,000.00 for Expenditure Head B.10, Department of Veterinary Services, to form part of this Schedule.
Mr Chairman, for the Supply Purpose B.10, Department of Veterinary Services, an allocation of RM1,129,000.00 is required to cover the payment of emoluments and fixed allowances for 39 new staff members of the Department.
The matter is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, the matter is agreed to.
The matter before this Committee is the sum of RM880,000.00 for Expenditure Head B.23, Department of Social Welfare, to form part of this Schedule.
The Honourable Member, Mr Chairman, for the Supply Purpose B.23, Department of Social Welfare, an allocation of RM880,000.00 is required to cover the payment of State General Assistance to aid recipients for the months of November and December 2020.
The matter is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, the matter is agreed to.
The matter before this Committee is the sum of RM13,000,000.00 for Expenditure Head B.28, contribution to the Statutory Fund, to form part of this Schedule.
The Honourable Member, Mr Chairman, for the Supply Purpose B.28, contribution to the Statutory Fund, an additional allocation of RM13,000,000.00 is required to cover the shortfall in allocation under the Johor Medical Trust Fund, to pay medical and travelling bills of civil servants, state pensioners and Honourable Members of the Johor State Legislative Assembly for the years 2020 and 2021.
The matter is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, the matter is agreed to.
The matter before this Committee is the sum of RM216,000.00 for Expenditure Head B.33, Syariah Prosecution Department, to form part of this Schedule.
The Honourable Member, Mr Chairman, for the Supply Purpose B.33, Syariah Prosecution Department, an allocation of RM216,000.00 is required to cover the financing of emoluments as well as fixed allowances for the staff of the Department.
The matter is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, the matter is agreed to.
The matter before this Committee is the sum of RM364,000.00 for Expenditure Head B.44, Pontian District Office; RM621,000.00 for Expenditure Head B.45, Segamat District Office; RM187,000.00 for Expenditure Head B.49, Kulai District Office; RM148,000.00 for Expenditure Head B.55, Pontian Land Office; RM221,000.00 for Expenditure Head B.56, Segamat Land Office
; RM82,000.00 for Expenditure Head B.58, Kota Tinggi Land Office; RM209,000.00 for Expenditure Head B.59, Mersing Land Office, to form part of this Schedule.
The Honourable Member, Mr Chairman, for the Supply Purpose B.44, Pontian District Office, an additional allocation of RM364,000 is required to cover the payment of emoluments and fixed allowances for staff of the Department, involving salary changes and approval of promotions.
For the Supply Purpose B.45, Segamat District Office, an additional allocation of RM621,000.00, namely RM536,000.00, is required to cover the payment of emoluments and fixed allowances for staff of the Department; RM51,000.00 to cover the employer's contributions to the EPF due to the increase in staff; and RM34,000.00 to cover the expenditure on COVID-19 Financial Assistance payments.
For the Supply Purpose B.49, Kulai District Office, an additional allocation of RM187,000.00 is required to cover the payment of emoluments and responsibility allowances that have been approved this year.
For the Supply Purpose B.55, Pontian Land Office, an additional allocation of RM148,000.00, namely RM93,000.00, is required to cover the payment of emoluments due to the addition of new staff and staff promotions, and RM55,000.00 is required to cover the payment of annual bonuses and staff financial assistance.
For the Supply Purpose B.56, Segamat Land Office, an additional allocation of RM221,000.00, namely RM156,000.00, is required to cover the payment of emoluments and fixed allowances for staff of the Department; RM18,000.00 to cover the employer's contributions to the EPF due to the increase in staff; and RM47,000.00 to cover the payment of annual bonuses and staff financial assistance.
For the Supply Purpose B.58, Kota Tinggi Land Office, an additional allocation of RM82,000.00 is required to cover the payment of emoluments and fixed allowances for the new staff of the Department.
For the Supply Purpose B.59, Mersing Land Office, an additional allocation of RM209,000.00 is required to cover the payment of emoluments for staff of the Department.
The matter is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, the matter is agreed to.
The Schedule forms part of this Bill.
FASAL 2
The matter before this Committee is that Clause 2 form part of this Bill.
Honourable Members who agree, please raise your hands. Those who do not agree, Clause 2 forms part of this Bill.
FASAL 1
The matter before this Committee is that Clause 1 form part of this Bill.
Honourable Members who agree, please raise your hands. Those who do not agree, Clause 1 forms part of this Bill.
The House resumes.
The Honourable Member, Mr Speaker, I wish to inform the House that this Bill has been considered in Committee clause by clause and agreed to without amendment. I therefore move that this Bill be read a third time and passed now.
The Honourable Member, Mr Speaker, I support that motion.
The question before this House is that the Bill named the Supplementary Supply (No. 3) Enactment 2020 be read a third time and passed now.
The motion is put for decision. Honourable Members who agree, please raise your hands. Those who do not agree, this Bill is read a third time and passed.
Be it enacted by the Johor State Legislative Assembly as follows:
This Enactment may be cited as the Supplementary Supply (No. 3) Enactment 2020.
MOTION ON EXEMPTION OF ASSESSMENT TAX FOR LOW-COST HOUSING AND REDUCTION OF ASSESSMENT TAX FOR CATEGORIES OF COMMERCIAL AND INDUSTRIAL RESIDENTIAL BUILDINGS.
A motion from the Honourable Member for Pekan Nanas was received by the Assembly Clerk under Standing Order No. 30(2) of the Rules and Standing Orders of the Johor State Legislative Assembly. Honourable Members, however, today the Honourable Member for Pekan Nanas has submitted an amendment to the original motion. The amendment made is to drop the matter concerning exemption of assessment tax for commercial and industrial residential buildings. Meanwhile, the matter of assessment tax exemption for low-cost housing in 2021 will continue. I have examined the written amendment that was submitted and found that it complies with Standing Order No. 39 of the Rules and Standing Orders of the Johor State Legislative Assembly. Therefore, I approve the amendment, which is brought before the House today. I would like to remind the Honourable Member that he is given only 15 minutes to move the motion. Please proceed.
Thank you, Honourable Mr Speaker. First of all, I thank you for accepting the amendment made to the motion that was originally submitted under Standing Order 30(2), and the amendment was made because the original motion I brought contained two different matters, namely first, exemption of assessment tax for low-cost housing, and second, reduction of assessment tax for categories of buildings, residential, commercial and industrial. At first, we intended that these two matters could be put to a separate division so that perhaps both could be accepted or at least one of the motions might be accepted. In fact, we were informed under the Standing Orders that a motion may only involve one vote. That is why I and Kota Iskandar made an amendment so that only one matter is focused on in this debate. After the amendment to the motion was made, the motion raised for debate in this House today is the write-off of assessment tax for low-cost housing in 2021.
I thank Mr Speaker for accepting the amendment to this motion and giving me the opportunity to bring this motion in this august House. I hope all Members of the House will give due consideration to this motion so that we can ease the burden on the people by reducing assessment tax for low-cost housing at this time. This motion is raised in this House because of the state of our national economy, which is facing a serious threat due to the COVID-19 pandemic.
Our economy has collapsed. Unemployment has soared, and because the economy and employment opportunities of the people of Johor also depend on the reopening of the Johor–Singapore border, the challenges faced by the State of Johor are very great compared with other states. Many businesses have declined and the people's spending power has fallen. The economic situation we are facing now is a state of depression. In view of this situation, the motion raised aims to seek the agreement of all Members of the House to make a wise and mature decision to ease the burden on the people. And owners of low-cost housing belong to the B40 group, who are facing desperate economic pressure. Most of them scrape by in the morning to eat in the morning, and scrape by in the afternoon to eat in the afternoon. They do not have sufficient savings in the bank to enable them to face any change in their lives. According to a report by Bank Negara Malaysia, 75% of Malaysians do not have savings of at least RM1,000.00. When they lose their source of income, or their livelihood is affected even slightly, they will face various problems. Some of them even cannot pay their electricity and water bills every month. Therefore, the exemption of assessment tax for low-cost housing in 2021 is very timely in easing the burden of their living. For the information of all the respected Members of the House, the Selangor State Government has exempted assessment tax for low-cost housing since 2016. I sincerely hope that all Members of the House can agree and implement the same policy to extend assistance, focusing on this group.
Honourable Mr Speaker, recently, Pekan Nanas has also noticed that several Local Authorities are preparing new valuation lists, such as in the areas of Johor Bahru, Pontian, Kluang, Batu Pahat and so on. When new valuation lists are prepared, many residents have begun to worry and ask whether they will face problems of assessment tax increases in the future. Therefore, I also hope that the Government can postpone all assessment tax increases even though the new valuation lists have been completed, for as long as the COVID-19 pandemic is widespread.
In conclusion, I call on all Members of this august House to unite for the sake of Johor that we love. Do not, because this motion was brought by the opposition, reject it to show the strength of the ruling party. At the same time, if this motion is accepted, it does not mean that the opposition has won; the position of the Perikatan Nasional government in Johor is like an egg at the end of a horn. If this motion is accepted and passed, it will be a people's achievement created in the history of this august House. When our country faces the threat of COVID-19, this is a time to show that although we have different ideologies and different political beliefs, we are mature and wise enough to reach an understanding that can benefit the people we love. Therefore, I once again humbly seek the goodwill of all Members of the House to support the motion for exemption of assessment tax for low-cost housing in 2021. Thank you.
Is there any support from the Honourable Member?
Terima kasih.
Speak in support or not in support?
I, Kota Iskandar, support.
Okay. Since the motion has been supported, I allow the motion to be debated by two State Assemblymen (ADUN) from the Government and two State Assemblymen from the Opposition. Time allowed is 5 to 10 minutes. Please invite the Government ADUN first, the Government ADUN first.
Bismillahirrahmanirrahim. Assalamualaikum and peace be upon all the honourable Members of this august House. First of all, Johor Lama would like to extend a thousand thanks to Honourable Mr Speaker for giving Johor Lama the opportunity and space to debate the proposal brought by Pekan Nanas concerning the property tax imposed by the PBT (Local Authority). Among the initial key points, this proposal is in fact for the exemption of property tax for low-cost houses and the reduction of property tax for categories of commercial buildings and so on. What Pekan Nanas mentioned is an exemption, not a reduction. So Honourable Member, the proposal brought by Pekan Nanas sounds nice and seems to be fighting for the people while we are facing the COVID-19 pandemic. Therefore, in this august House, Johor Lama would like to explain and present several facts which will prove why the exemption of property tax by the PBT during this pandemic period is not a reasonable and rational action to be implemented by the Johor State Local Government Authority. Under the exemption of property tax for low-cost houses in 2021, it cannot be implemented because it contravenes Sections 134 and 135, Act 171. However, the Local Authority, with the approval of the state authority, may set an appropriate rate for property tax on low-cost houses for 2021 based on Section 127 of Act 171.
Last Thursday, Honourable Mr Speaker, the Most Honourable tabled the 2021 Johor Budget, which, although it is a deficit budget amounting to RM248.14 million, with all the initiatives offered to the people of Johor during this pandemic, it is very helpful for the people out there to breathe.
When this budget was tabled, many Honourable Members in this august House asked where the government obtained contributions or savings to finance this budget. Honourable Mr Speaker, apart from the programmes and contributions implemented by the state PBT through the PBT Foundation (Yayasan PBT), the Johor State PBT has also carried out its responsibilities as set out in the 2021 Budget under the Agenda Johor Niaga, under paragraph 128, the second initiative which reads: to ease the burden of hawkers and traders, the state government will implement exemption of hawker licence fees, trader licence fees, PKS Mikro, rental of premises and stalls, rental of night market and market sites for one year effective January 2021. Through the third initiative under Johor Niaga, it also states that the state government will encourage small-scale business, in which the PBT and PUJB will play a role in providing suitable space and business opportunities for small traders and food truck operators.
Honourable Mr Speaker, Johor Lama is of the view that all the initiatives and programmes mentioned earlier will certainly benefit the target groups who receive them, and Johor Lama believes that most of them belong to the B40 group. Therefore, Honourable Mr Speaker, Johor Lama is of the view that the PBT has already played its very significant role in assisting the government and helping the affected people without having to sacrifice its main source of income, namely the collection from its property tax. A reduction or exemption of property tax will cause the PBT to be unable to carry out its responsibilities effectively. The cost borne by the PBT at present is higher than the amount of property tax paid by property owners. As an example, I will take an area close to me. First, I have looked at and conducted a study in the Bandar Mas area, in the Pengerang Municipal Council (MPP) area. In the mixed-housing area where many or most of the residents are among low-cost housing residents. The total holdings are 658 units. The property tax collected is RM90,472.00. The MPP bears only waste collection costs of RM118,440.00. Roadside grass cutting, rubbish collection, cleaning and so on RM357,000.00. So, if we add up the costs borne by the PBT, it comes to RM475,000.00 compared with collection of only RM90,000.00, meaning RM385,000.00 is borne by the PBT.
The second example, in the village, at the low-cost housing of Taman Teluk Ramunia. The total holdings are 24 units, the total property tax is RM1,493.00. The costs borne such as waste collection and so on amount to RM6,328.00. So, this is the total cost borne by the PBT for low-cost housing. Referring to Section 136, Act 171, if the total property tax imposed on a holding is less than RM5.00 a year, then property tax need not be paid, Honourable Mr Speaker. So, to further clarify the situation, Johor Lama would like to give one more example at the Kota Tinggi District Council, which has 3,456 low-cost housing units, where if the exemption requested by Pekan Nanas is granted, the Kota Tinggi District Council PBT will lose RM260,000.00, Honourable Mr Speaker, and this will certainly affect the operations of MDKT and hamper the development of the Kota Tinggi district if it is implemented.
Honourable Mr Speaker, for the information of this august House, most state PBTs in Johor have not increased their property tax rates for 5 to 7 years. Then in 2019, the government at that time agreed for 15 PBTs, except MP Kulai, to carry out a re-valuation since the new valuation list and tax rates had exceeded five years. And this year, the implementation of the property tax re-valuation work was reviewed in view of the outbreak of the COVID-19 pandemic. This means, Honourable Mr Speaker, that the state PBTs of Johor have already decided to maintain the same rates for 2021 even though the PBTs had the opportunity to impose a new rate. Here, Honourable Mr Speaker, the PBTs have made a sacrifice by only maintaining their existing property tax rates, and for Pekan Nanas to propose a property tax exemption is very unreasonable when compared with all the efforts, initiatives and aid contributions made by the state PBTs of Johor.
Honourable Mr Speaker, property tax is the main source of income for every PBT, however, not all PBTs obtain sufficient income from the collection of this tax. Honourable Members are well aware that development occurring in the state of Johor is not comprehensive. There are PBTs in whose administrative areas there are no industrial areas that can generate substantial property tax revenue. These PBTs rely heavily on revenue from residential property tax, which mostly consists of low-cost houses, and also on other non-tax revenue such as business premise licences and so on. There are existing PBTs that are not capable and depend on assistance from the state government.
Honourable Mr Speaker, this Local Authority is a local government that bears its own operating costs based on its income revenue.
30 seconds more, Honourable Member. 30 seconds more.
In simple terms, this PBT carries out its operations by employing its staff and workers, depending on its own income.
Honourable Mr Speaker. As we navigate the uncertainty of hopes arising from the COVID-19 pandemic, let us not act like digging a hole to cover a hole, which will not only fail to solve the problem but will make the situation worse. Let us not, in order to fill up river banks to prevent flood disasters, continue to level hills and mountains until they are flat. Know that hills and mountains act as the pegs of the earth. If the pegs collapse, then the earth will be destroyed. Honourable Mr Speaker, with this, Johor Lama concludes the speech and rejects the vote on the property tax exemption proposed by Honourable Pekan Nanas. Thank you. (House applauds).
Next, one Opposition ADUN (State Assemblyman).
Thank you, Honourable Mr Speaker. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, before Kota Iskandar delivers the supporting arguments for the proposal submitted by Pekan Nanas, allow Kota Iskandar to explain three main concepts in determining property tax. First, the basis of rate assessment. Johor is the only state that adopts a rate assessment basis based on improved value, with permission. Whereas other states are based on annual value. Improved value is equivalent to the current market value, whereas annual value is based on the rental value of one month within 12 months.
Second, the basis of the valuation list, valuation list, with permission. According to Section 137, Subsection 3, of the Local Government Act, the valuation list must be prepared once every five years. Why, Honourable Mr Speaker, is it that taxes imposed on the basis of justice every five years, when market conditions change, ultimately the property owners pay higher taxes when market prices are high, and vice versa, they pay lower taxes when market prices are lower.
Third, is the property tax rate, namely the amount of property tax paid can be obtained by multiplying the property tax rate by that improved value. And in my view, this property tax rate is recorded differently according to the category of house and also from one PBT to another PBT, and this property tax rate can also be used as a balancing function by the government if the new valuation list submitted shows a sudden price increase, so that ultimately the quit rent or property tax paid by the landlord increases in a non-drastic or non-sudden manner.
Honourable Mr Speaker, Kota Iskandar supports the proposal submitted by Pekan Nanas based on six arguments. First, housing is a basic necessity to the people and to human life, and low-cost houses are subsidised housing intended specifically for the target group B40, or those with low income. Honourable Mr Speaker, take for example Taman Universiti in my area. Standard low-cost house of RM150,000.00, annual tax is RM255. Although the amount is small to us, it means a great deal to the B40 group.
Second, before the second, the first one just now, the B40 group is the group that is most easily affected by the impact of the COVID-19 pandemic outbreak. Second, in principle, property owners in the state of Johor pay property tax at a higher figure than they should. Why do I say so, Honourable Mr Speaker, because most PBTs do not prepare valuation lists according to the provisions of the Local Government Act once every 5 years. On average, PBTs now make their valuation levels based on 2013. The new valuation list should have been done in 2018, not 2020. Market conditions in 2018 and 2020 are different. This means it is now higher than 2018. If we use this year's valuation as the basis, it means we will impose a higher amount than it should be.
Third, Honourable Mr Speaker, in line with the proposal from Pekan Nanas just now, there are 15 PBTs mentioned by our colleague earlier that are currently in the process of re-valuation or a new valuation list, so I agree with Pekan Nanas' proposal that enforcement be postponed to a more suitable time, and if the state government and PBTs still insist on enforcing it next year, then please use the tax rate I mentioned earlier as a balancing factor to ensure the increase in property tax is at a more reasonable and fair amount.
Fourth, I want to rebut, with permission, what was mentioned by our colleague Johor Lama just now. What was meant by Pekan Nanas is the exemption of property tax for low-cost houses, not for residential properties as a whole, and if we look at the average total property tax collected by PBTs for low-cost housing compared with the overall property tax collected, the information I obtained is not even 2% to 3% of the total collection of overall property tax. Therefore, I state that the financial impact experienced by the PBTs is very minimal. And also, I want to touch on that Pekan Nenas did not even mention whether this reduction is recommended for all 16 PBTs. No, I did not hear it at all. This means the state government and PBTs can make considerations appropriate to the financial position of each PBT concerned. Wherever we can, let us try to make this noble motion or proposal realised.
Fifth, Honourable Mr Speaker, during good economic times before the arrival of COVID-19, property tax, as mentioned by my colleague from Johor Lama just now, represents almost 55% to 57% of the Local Authority's income revenue. They are loyal taxpayers, because if it is not paid, Honourable Mr Speaker, their movable properties can be seized. This means they must, whether they like it or not, become firm taxpayers to the Local Authority. That is why when the situation is the opposite, the government or PBT must have a attitude of rahmah or compassion towards those with low income, who are easily affected by COVID-19, so that they can continue their lives just like us. If we look at the aspect of rahmah in the concept brought by Rasulullah SAW in Surah Al-Anbiya verse 107. (Recitation of the surah), "We have not sent you, O Muhammad, except as a mercy to the worlds." The meaning of rahmah here means justice, compassion, tolerance and also affection. So, gentlemen, if the government accepts this proposal or negotiation, then the exemption of property tax payment for these low-cost houses can be regarded as a token or appreciation for the loyalty of low-cost housing property owners all this time who have contributed income to the Local Authority.
Finally, Honourable Mr Speaker. The proposal submitted by Pekan Nanas, as I mentioned just now, does not even touch on or mention that it must be implemented for the 16 PBTs in the state of Johor. In conclusion, I recommend that the support of the honourable Members of this August House is very important for us to give a clear and firm signal that the Johor government is very concerned about the services of property taxpayers all this time, and also very concerned about the fate and hardship that befall them, particularly in facing the impact of the COVID-19 pandemic outbreak. Thank you, Honourable Mr Speaker.
Go to the market to buy fish, fish bought together with cassava, so far the arguments have been given, Kota Iskandar respectfully asks for support. By the grace and guidance of God, and peace be upon you, assalamualaikum warahmatullahi wabarakatuh.
Thank you, Kota Iskandar. State Assemblyman from the government. Please.
Assalamualaikum warahmatullahi wabarakatuh. (Reciting salawat). Honourable Mr Speaker, actually the most difficult thing is what Honourable Pekan Nanas brought earlier. When he keeps pleading like that, you know. Firstly, I find it strange...
That's not Johor Jaya yet, is it? Just Pekan Nanas for now. (House laughs).
Honourable Mr Speaker, thank you for giving me the space to debate on behalf of the government. Firstly, I was rather surprised by the amendment made by Honourable Pekan Nanas. Previously I prepared almost ten rounds of ammunition for me, what, to debate
in this session. But when he amended it to just one exemption for low-cost housing, then the ammunition is only one left. But I am sure, one bullet, one enemy. So Honourable Mr Speaker,
Not enemies, strategic partners.
Thank you for reminding me. Honourable Member, Mr Speaker, actually, in terms of the title of this negotiation, we need to know the difference. The negotiation concerns exemption of property tax for low-cost houses. Exemption by reducing the rate, reducing the tax, is different. The Honourable Pekan Nanas here says it is an exemption.
So, Honourable Member, Mr Speaker, I would like, allow me to share with Mr Speaker and fellow Honourable Members. I wish to refer to Act 171. Under the Local Government Act 1976, under Section 134, based on the negotiation brought by Pekan Nanas, he mentioned an exemption for low-cost houses. If we follow Section 134, it cannot be done based on this Section. The exemption only provides for 4 matters.
1. As a public place, so an exemption can be made.
2. As a cemetery.
3. Public schools.
4. Public places for charitable purposes or for literary science or fine arts.
Honourable Member, Mr Speaker, clearly Section 134 can be read together with Section 135. When any holding or any part thereof is used solely for the purposes of recreation, social or welfare and not for pecuniary profit, the State Authority may, at its discretion, exempt the holding or part of the holding from payment of all or any rate, or may reduce any rate imposed on the holding or part of the holding. Clear, Honourable Speaker, yes.
Honourable Member, Mr Speaker, what is enshrined in Act 171, the Local Government Act 1976, under Sections 134 and 135, clearly proves that the state government has no source of authority over the negotiation brought by the Honourable Pekan Nanas. The state government cannot lower taxes and can only impose tax rates as enshrined under Section 127, which states, "Pihak Berkuasa Tempatan boleh, dengan kelulusan Pihak Berkuasa Negeri, dari semasa ke semasa sebagaimana difikirkan perlu mengenakan sama ada secara berasingan atau sebagai suatu kadar yang disatukan, kadar atau kadar tahunan dalam sesuatu kawasan Pihak Berkuasa Tempatan bagi maksud Akta ini atau bagi maksud lain yang mana adalah kewajipan Pihak Berkuasa Tempatan itu menyempurnakannya di bawah mana-mana undang-undang bertulis yang lain."
In conclusion, Honourable Member, Mr Speaker, indeed when the negotiation from the Honourable Pekan Nanas is like this, it is quite difficult. Outside there, perceptions are already varied. He says what, the government does not understand the people's problems, that government and this government. Say we are friends? But the way of this negotiation is just provoking us to become wasps. That is why, Honourable Speaker, on behalf of us, do not make this negotiation into a political agenda for those who have interests or whatever explicit agenda. This is not the time. We already promised the other day. When we debated. I remember all the opposition Honourable Members debated and we on the government side also debated. We are strategic partners, as said by Mr Speaker.
I did not say it, Honourable Member. The Honourable Menteri Besar said it.
Okay. Thank you. Thank you for always reminding me. Now that it's evening, he often slips up. But I pray that the slip will eventually benefit us all. Those outside, Honourable Mr Speaker, we must understand, we should not feed them with matters that are untrue, not impossible, and I am confident that for the next 5 years, the same matters will actually be brought up. Just now the Honourable Kota Iskandar said every 5 years, every 7 years. Yes, I know. I prepared my text, I remember from 10 in the morning yesterday until 11 at night. For what reason? Because I wanted to answer that negotiation, there was indeed a lot. Commercial ones exist, but only one remains.
On the year, Kota Iskandar, if I may inform here, I have never once wanted to question what the previous government did, or PH. Today it is PN, we will move forward. In 2019, if the Honourable Kota Iskandar also knows, in the Cabinet (MMK) it was agreed that 15 Local Authorities (PBT) would carry out a revaluation of tax holdings in their respective areas. 2019 was not our era, you know, Honourable Kota Iskandar. At that time it was the Pakatan Harapan government. Why was the negotiation not brought up before this? Just to tease us, right? Is it that before was different and now is different? It's the same. Sorry. I assume that at that time perhaps the previous Honourable Menteri Besar, the economic situation was good. Perhaps did not take into account what is happening today. And indeed what is happening now is beyond the control of all of us. So, there is no need for us to question the PH era or the PN era or whatever, right. What is important is that we want to continue good administration for the people of the state of Johor. (The House applauds).
Moreover, Mr Speaker, we admit that in October 2020 in the Cabinet (MMK) it was the same. The government today also agreed to implement the revaluation of all PBT to continue. That too, Honourable Mr Speaker, the enforcement date is subject to the government's decision from time to time. Especially in this COVID-19 situation, as said by Pekan Nanas and Kota Iskandar, God willing, I am confident, under the leadership of the Honourable Menteri Besar of Johor, there will certainly be no oppression in the state of Johor. God willing. (The House applauds). And I also know, the Honourable Pekan Nanas himself knows, this matter is already enshrined. Every 5 to 7 years, we make a re-coordination. Now it's gaharu and sandalwood again, now you want it lowered.
Honourable Mr Speaker, I will summarise. Two minutes left. I fully support what was said by the Honourable Johor Lama. Johor Lama said PBT make many contributions through foundations. There are 16 PBT foundations, I remember more than RM11 million. RM11 million spent to help the people. It is not that those who receive the benefit are the Honourable opposition, the government, not only the taxpayers, those who receive the benefit are actually also among non-taxpayers. If today, if the function of PBT is only placed to help taxpayers,
I think in the situation of Johor today with COVID-19, many people are suffering.
So, Honourable Mr Speaker, I would like to propose to the Honourable Pekan Nanas. Just now I already mentioned Sections 134 and 135. I propose that with the source of authority available, any enactment of Section 134 under Act 171, the Local Government Act 1976, to include additional exemptions beyond the 4 I mentioned, is within the jurisdiction of Parliament. Honourable Speaker, perhaps YB Pekan Nanas can propose to any Member of Parliament, the Honourable Simpang Jeram is also there. I want to say on my left, I am rather frightening. Can propose to the Honourable Members of Parliament, tell them, just do it, add one more exemption for low-cost houses. And God willing, we will have no problem. Because we know this is not the jurisdiction of the state government. So we are unable to do it.
Honourable Speaker, I propose that this negotiation need not be put to a vote and should not, should not be debated in this august House. I call on my fellow opposition colleagues, do not let it be that when this negotiation is debated in the Johor State Assembly, it creates various negative perceptions outside. Be assured, the government today will always be with the people of Johor. That is all, assalamualaikum warahmatullahi wabarakatuh.
Yes, thank you, Sri Medan. Invite the representative from the opposition, the last one.
Bismillahirrahmanirrahim. Mr Speaker, allow me to stand, perhaps the last speaker in this session. In support of my colleague Pekan Nanas's negotiation, which I feel is a negotiation that is pro-people. Don't worry, this politics is calm. We, while there, did our best for the people. And, when we are here, we voice what we felt we did not have the opportunity to do when we were the government. The government today can change at any time. Time will tell.
I wish to state that my colleague just now, the last one, Honourable Sri Medan, don't mislead. Because the authority for us to agree or not to raise this tax is it's a state matter, with permission. So, as the government today, I have carefully examined the budget presentation and also the winding-up by the Honourable Benut, my old friend. I feel there is no problem. There is small matter, a minor matter. Only about 2% of the total tax collection will be enjoyed by all the people. Not to play politics, but just a fact. If we open our ballot boxes, including my constituency where I contested, these low-cost houses, Honourable, most voters are loyal to UMNO, Barisan Nasional. So, what is wrong with, for the sake of the people, even though tomorrow they will not vote for us, we want to record in this State Assembly session this time for the Honourable Menteri Besar to consider the best for the rakyat. (The House applauds). That is important. In this COVID, many live hand to mouth, day by day, with permission. Many more among us, when COVID happened, we as Representatives who came, these are people who are living from hand to mouth, with permission. No income today, they cannot live. Therefore, it is these people who live in these low-cost houses. Therefore, non-political. If they get it, they are the lucky ones. Voting on election day is their right.
Democracy. But our duty today is to support what was said in the Pekan Nanas negotiation, a negotiation that I consider pro-people, which must be given attention by the government of today.
Mr Speaker, for 10 minutes the Honourable Prime Minister and I are here, we are busy in Parliament. Allow me to give some brief comments on the budget that I examined objectively, presented by the Honourable Benut and all of us. And, we have one commitment with this budget, we are able to deliver it to the grassroots level. And, I request to YAB Benut that with this budget, we ensure there is no snap election. There is no election next year. If we meet all Their Royal Highnesses in our country, all the Rulers have commanded that if possible they want a stable government, they want a strong government, and if possible we avoid elections because COVID will threaten us all. Therefore, the Menteri Besar can meet His Royal Highness of Johor and state that we, Members of the House, with the budget that has been presented, are ready to be together and no snap election, that is good for us all. Moreover a state of emergency. Do not hold an emergency. We have COVID under control, we must leave this COVID. We can no longer lock down, we cannot confine people at home, our economy is worsening, there is no emergency, we face COVID, nurture democracy, and together we revive the economy of Johor in particular. With the budget that has already been presented. If the Honourable loses allies in the near future, you can negotiate with us on the Pakatan Harapan side. We are loyal friends. We won with the mandate of the people and we do not run our seats here and there. Anything will happen next week, with permission, in Perak. A new scenario in Perak, the government has already fallen.
The call to prayer, Honourable Member.
Okay Mr Speaker, we want a strong government, a stable government, a government able to provide the best for the people. But the political scenario today is uncertain. What happens in Perak next week will change the landscape of our nation again. But I am confident and believe in the great grand collusion of political parties that can pledge loyalty to the people, to face the interests of the people, we PH, Pakatan Harapan can consider it. And I am confident and believe that including in this state of Johor, that is, I think the Honourable yesterday, not joking as politicians with political talk, has given a view that there should be a motion of confidence in UMNO for our Menteri Besar. But apparently there is none. Whether we win or lose, that is not the important matter for me, because for me, political legitimacy. The legitimacy of this government must be proven in this house, for me. And, whoever becomes our Menteri Besar, we have no problem because our oath as Members of Parliament, our oath as Members of the State Assembly, is to defend democracy, defend the constitution and defend the position of the Malay Rulers, but legitimacy is important because I want, with this strong collusion based on integrity and trust. Already tried, the PN government, 98% Malay, only 2-3% non-Malay. Falls in Perak, perhaps falls at federal, if falls at federal perhaps Simpang Jeram and Gambir can discuss again. What may possibly happen, in politics nothing.
Honourable Mr Speaker,
Which Standing Order, Honourable Member?
I have already asked permission, just now perhaps I strayed a bit from this speech so...
Peraturan 45(vi).
Yang Berhormat...
This is the call to prayer now, Honourable Member. Let's all sit down together.
(Pause briefly to allow the call to prayer.)
I think, I end my speech with thanks and I support the negotiation from Pekan Nanas.
Honourable Mr Speaker, Parit Yaani supports, I request through Standing Order 116, I request the House to vote by division on the Pekan Nanas negotiation, thank you.
Honourable Members, since there is a request from Parit Yaani for a division, before the division is conducted, if there are any Honourable Members outside, I think everyone has entered, it's alright, we will give one minute to allow Honourable Members to enter the State Assembly before the doors of the House are locked to allow the division to be conducted. One minute, I think everyone has been accommodated. Just one minute.
And, I ask the Clerk and two Assistant Clerks to act as counters for the vote counting unit for the government bloc and the opposition bloc. Ready. Everyone is accommodated. Okay, can lock. Okay, please, one minute has passed. Please, the Clerk and his assistants proceed to count. There, there are 3, yes, Those in Favour, Those Against and Abstentions. Abstention means those who are neutral and the fourth, Absent. So we have three options, yes. Those in Favour, Those Against and Abstentions.
Honourable Mr Speaker,
Ya, saya.
May I give a brief view, even though we are here, let's say we all agree, but the source of authority for this matter is still not from within the State Assembly...
That has already been argued, Honourable Member. It was already argued just now.
But the argument is correct. But the actual source of authority is not with us.
But I think it is not fair if we give Honourable Members more opportunity. Enough with the debate just now.
No, this is what I want to counter here, even if we agree but Parliament does not agree, what is the meaning of us voting here. So here is what I want to ask.
The debate has concluded, Honourable Member.
Interpretation, Act. This is not the place for us to discuss interpretation...
The debate is over, I do not permit it.
Honourable Mr Speaker, in fact, in the states of Terengganu and Selangor there already is a policy like this. If we want to say this is not under the power of the state government, there is a bit and in fact. We can also reduce the tax rate to zero. Thank you.
Pekan Nanas, sit down. Pekan Nanas, I ask you to sit down.
Pekan Nanas.
I explain, I explain, yes, everyone. The debate is over. This is voting time. There is no debating while voting. Honourable Member, please keep order. How can we debate while voting? When voting, vote; when debating, debate, yes. So I do not allow any debate. We are still in the sitting.
Ok, alhamdulillah, we have the result. Honourable Members, the division vote has been carried out. Those in favour: 27 persons. Those against: 29 persons. Abstentions: zero persons. Absent: zero. Therefore, since more members voted against than in favour, the motion is not agreed to.
Honourable Members, be informed that the Honourable Member for Parit Yaani has withdrawn the motion on the Election of Members of the Dewan Negara (Senate) under Standing Order No. 33(2) of the Standing Rules and Orders for the Johor State Legislative Assembly (Dewan Negeri Johor), through his letter dated 19 November 2020. The Clerk of the Dewan Negeri (State Legislative Assembly) also informed all Honourable Members, through a letter dated 30 November 2020, regarding this matter. The motion is deemed to have been withdrawn, and a reminder of it shall be entered into the Minutes of the Meeting.
Honourable Mr Speaker, I move that this House be adjourned.
Honourable Mr Speaker, I second the motion. Thank you.
Ok, we are at the end now, so since everyone has recited pantun, I want to recite the last one. Penawar, listen carefully.
Tarian Johor tarian zapin, tarian Kelantan ulit mayang, kalau hendak jadi pemimpin, selain bijak perlu sembahyang.
Sungguh cantik bunga di taman, bunga raya ditanam di sebelah, pemimpin amanah serta beriman, rakyat dipimpin ke jalan Allah.
Hijau menguning padi di sawah, tunduk berisi bagai nak rebah, pendirian kukuh tidak goyah, menghadapi cabaran tidak gelabah.
Jadi, tiga-tiga ini ditujukan kepada kita bersamalah sebagai pemimpin.
Honourable Members, before this House is adjourned, I and all Members of the Johor State Legislative Assembly (Dewan Negeri Johor) wish to record our highest appreciation and sincere thanks to the front liners, who are always on standby in carrying out their duties tirelessly to safeguard the security and well-being of the people of this state and country since the outbreak of COVID-19 in March last year.
Honourable Members, I seek forgiveness and pardon if there have been any mistakes or wrongdoings. I now adjourn this House until a date to be determined later.
The sitting was adjourned at 4.35 pm.
Duty Officers:
Hansard Reporter Cik Hajah Shubanah binti Yusuf, SIJ., PIS.
Assistant Hansard Reporter Encik Hasnul Atmam bin Othman Puan Farrah Diana binti Mohammad
Coordinator Puan Hajah Norela binti Osman
Publication Assistants Puan Malina binti Mohd Nasir Puan Noraisah binti Mohd Yusof Encik Ariff bin Abu Bakar
Operations Assistants (Bentara) Encik Razine bin Sulaiman Encik Hamdan bin Markom Encik Norhayadi bin Hussien Encik Muhamad Khirunizam bin Pahmi Encik Mohd Norazri bin Kasim Encik Mohd Sapri bin Manan Encik Muhamad Khairul Asyraf bin Abdullah Encik Muhammad Khairul bin Arop
Office Secretaries (House Reporters) Puan Hajah Zalinah binti Ali Puan Hajah Saniah binti Kassim Puan Hajah Rumiah binti Semirono Puan Zahiti binti Muhammad Hamdi Puan Hajah Azlin binti Bahrin Puan Junaidah binti Paing Puan Hajah Fareza binti Musa Puan Hajah Haironisha binti Zainal Abidin Puan Hairun Nurul Ain binti Zainal Abidin Puan Siti Rojimah binti Abd. Razak Puan Shuriati binti Abdul Hajar Puan Noor Dalilah binti Dahalan Puan Norlydialina binti Isnin Puan Norazilawati binti Masri Puan Raihanah binti Ismail Puan Siti Rohani binti Ahmad Suhaimi Puan Haslizah binti Asmani
Recording Encik Nor Risam bin Esa Encik Azizan bin Md Sidi Encik Khairul Anuar bin Umar Usman
Video Audio Operators Encik Noorazhan bin Mohd Salleh Encik Ismail bin Abu Bakar