Pulau Pinang · 1 June 2022

14th Assembly, 5th session, 1st meeting · 449 turns · 54,622 words · official PDF ↗

371 of 449 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

Absent: Dr. Afif Bin Bahardin (Seberang Jaya)

(Opening)

Secretary of the HouseEN

Honourable Members, Honourable Yang di-Pertua of the State Legislative Assembly. Prayer.

Deputy Secretary of the Dewan

“Bacaan Doa”.

Secretary of the House

Soalan lisan.

Speaker (Speaker)EN

Honourable Members, the House resumes with the oral question session. I would now like to invite the Honourable Member for Air Putih.

Lim Guan EngDAP · PHAir PutihEN

Thank you, Dato’ Yang di-Pertua. Question No. 19. No. 19. State the detailed status of the cable car project at Bukit Bendera, including the project cost, the source of funding and any assistance from the Federal Government, if any.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member, Dato’ Yang di-Pertua, and also the Honourable Member for Air Putih for the question. Firstly, Honourable Member, I would like to convey my highest appreciation, because when Air Putih was Minister of Finance, he had approved RM100 million in the 2020 Budget for the construction of the cable car project for Bukit Bendera. Unfortunately, we all know what happened: the betrayal that brought down the Pakatan Harapan Government, and among the casualties of that situation was the cable car project, which was cancelled by the Perikatan Government. Nevertheless, Honourable Member, the State Government decided to proceed with the project by calling for an RFP to collaborate with the private sector through a joint venture or through a Build-Finance-Operate-Transfer (BFOT) arrangement, after the Federal Government withdrew the allocation that had already been approved by the previous Honourable Member. This RFP was called on 13 January 2021 and the closing date for the RFP is 30 November 2021. The evaluation process is ongoing and will be finalised. The evaluation results are submitted to the technical committee and the PEMANDU committee based on the Penang State public-private partnership project guidelines 2021.

The offer to the successful bidder is expected to be issued before the end of 2022. As this project is a BFOT project through an RFP call, all construction and operating costs will be borne by the successful bidder. And to answer the Honourable Member’s question, no allocation at all has been received from the Federal Government, thank you.

Speaker (Speaker)EN

Thank you, please proceed.

Lim Guan EngDAP · PHAir PutihEN

Thank you to the Honourable Member from Tanjong Bunga for the answer just now. Surely, in this aspect, what are the conditions that will be offered to the successful bidder, because the cost of this cable car, I feel, is not small. Can an estimate of the cost be given, and how can they obtain returns, because if we are to argue this, they must surely make a profit, and if not, I feel this may become a problem later. Of course I would like to congratulate the State Government for not needing to allocate any funds, but I am also worried about its liabilities if there is no allocation, because we know it is a system or a mode of public transport. Is this viable? And finally, regarding the price and the allocation that may be issued, what other steps will be taken if it cannot be implemented by the bidder? Thank you.

Speaker (Speaker)

Sila.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member, for the good question. Actually, Honourable Member, in making this RFP we have built in some flexibility regarding a suitable concession period, and we also welcome proposals on business models or finance models from bidders. They are also allowed to add several value-adds so that they can obtain a reasonable return within the stipulated time. However, I, I also agree with the Honourable Member that we need to ensure this is not merely a tender exercise; we want to ensure this project can become a competitive project, one that can compete, that is competitive, and that can also be implemented well for the benefit of Penang, especially in the tourism industry in that area. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. I would now like to invite the next question, the Honourable Member for Bayan Lepas. Bayan Lepas is not in the House, so the question is skipped. Next, I would like to invite the Honourable Member for Sungai Acheh. Sungai Acheh is also not in the House, so the question is skipped, and we move on to the Honourable Member for Sungai Pinang.

Lim Siew KhimDAP · PHSungai PinangEN

Dato’ Speaker, my question is Question No. 22. No. 22. State the main focus of the portfolio of the MMK for Social Development. (a) Does this portfolio only involve the aspects of Women, Children and Family? Explain. (b) Does it need to involve marginalised groups such as prisoners, drug victims, orphans, and others? Elaborate. (c) List the programmes implemented under the Social Development portfolio and the groups who benefit from them.

Chong EngDAP · PHPadang LalangEN

Thank you to the Honourable Member for Sungai Pinang. Sungai Pinang asks: state the main focus of the portfolio of the MMK for Social Development. For A, is this portfolio only involving the aspects of women, children and family? The portfolio of Women, Family and Gender Inclusivity Development, Religions Other Than Islam, was renamed as the portfolio of Social Development and Non-Islamic Affairs, effective 15 September 2020. The main focus of the MMK for Social Development is to strengthen and develop the social support system and social services, while creating a society that has the opportunity to develop its own potential within a social environment that is based on the well-being of the people. For (B), yes, there is what was asked: “Does it need to involve marginalised groups such as prisoners, drug victims, orphans and others?” The answer is that social development involves the development of society as a whole, in which women and families are part and the basic unit of society. For marginalised groups such as drug victims, orphans and others, there are already institutions or agencies that have the expertise and are responsible for handling their affairs. However, the MMK for Social Development is not prevented from cooperating with the agencies concerned to develop society together. For Section C, which is to list the programmes implemented under the Social Development portfolio and the groups who benefit, for this year, or additional programmes under Social Development, there is a strong focus on the safe family policy, under which several workshops and awareness sessions on domestic violence have been implemented. There are three (3) workshops: one for frontline members of the Royal Malaysia Police (PDRM) so that they better understand the dynamics of domestic violence and are more sensitive in handling domestic violence cases. There are also awareness sessions and workshops for the Islamic Religious Affairs Department (JHEAI). This is because, after we were renamed Social Development under PWDC, we have established another department called Women Development, Family Development and Children’s Development, so we are able to carry out programmes like these, up to now. Thank you.

Speaker (Speaker)

Terima kasih.

Lim Siew KhimDAP · PHSungai PinangEN

Supplementary question. Thank you to the Honourable Member for Padang Lalang. My question is, seeing that the portfolio has been expanded, and as was said just now that it involves society as a whole, what challenges are faced by the State Government in managing the Social Development portfolio, and does the State Government plan to increase the allocation? Thank you.

Chong EngDAP · PHPadang LalangEN

Thank you to the Honourable Member for Sungai Pinang. Indeed, every portfolio or every programme requires a budget, so likewise, if we want to carry out many programmes under social development, we need a budget. But at the present time I have not yet made the request, because it has not yet been implemented on a larger scale. So for now it is supported by PWDC. I feel that if we want to do it fully, for example, there are now increasingly many social constraints, and if we want to do it fully, I feel we need to set up a social department so that it can tackle mental health problems. It can tackle the constraints of parents, because when they go to work they need care services, child care services and also for the elderly. All of this involves the formulation of policies, programmes and budgets. So I hope we are able to do much more. Thank you.

Speaker (Speaker)EN

Thank you. Now I would like to invite the Honourable Member for Bukit Tengah.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Dato’ Speaker. My question is Question 23. No. 23. What is the government’s plan to address the traffic congestion in KADUN Bukit Tengah, which is getting worse?

(a) State the detailed particulars of road upgrading and widening projects that have been and will be implemented by the State Government itself, and those that have been applied for to the Federal Government to be implemented.

Speaker (Speaker)

Terima Kasih.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato’ Yang di-Pertua, and thank you, YB Bukit Tengah, for the question. For YB Bukit Tengah, the State Government has several proposals to address the traffic congestion in KADUN Bukit Tengah.

Among them, firstly, is to carry out the widening of Jalan Permatang Tinggi. For this, Honourable Member, the PWD of Penang State has already applied in the third rolling plan, and we hope for approval from the EPU. The second is to carry out the widening of Jalan Kebun Baru SPT, and also to add a little more. The PWD is currently implementing a widening project from the roundabout of Penang Science Park to the Jalan Juru junction, Jalan Tok Kangar. Meanwhile, the PDC is implementing a project for widening from the Jalan Juru junction, Jalan Dato’ Kangar, to the Auto City junction. Nevertheless, I accept that there are some delays, yes, especially for the PDC section, but I can inform you that several efforts are being carried out to address the on-site problems. The third, this implementation is for a rather long-term period. The implementation of a BRT system through the Permatang Tinggi route in Seberang Jaya, which is one of the public transport modes under the PTMP. The length of this route is estimated at 15 km, for which 17 stations have been proposed. However, this is a component for the future, and we are currently implementing the earlier phases of the PTMP. The fourth is to carry out road widening and contraflow on Jalan Kebun Nenas; this idea will be carried out after obtaining the results of the EIA study that is being conducted. For further information requested by the Honourable Member, there is an attachment that will be placed on the Honourable Member’s table. Thank you.

Speaker (Speaker)

Terima kasih.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Honourable Member, this issue of traffic congestion is becoming very severe in Bukit Tengah, and as has been informed, Bukit Tengah is an area of development that is now very rapid and important for traffic from the north to continue to the south, especially to factories and so on. So we often receive very evident complaints from residents, and I hope this matter can be resolved by the State Government. However, from what I heard in the answer to the question just now, I am very disappointed, and I also see that this PDC is very, very slow. It is indeed slow. They need to change their consultant, just change them. I hope this can be resolved. Nevertheless, I believe the Honourable Member is doing his best. My next question, my supplementary question, is what about Jalan Auto-City and Jalan Kebun Nenas? The Kebun Nenas Auto-City interchange is very, very bad, Honourable Member. What is the plan to resolve the traffic congestion? Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member, and I also apologise for the consultant appointed by the PDC, because the original design now needs to be amended due to problems. Nevertheless, for the question asked by the Honourable Member regarding the Juru-Autocity intersection and also Jalan Kebun Nenas, we have appointed a consulting company, and a TIA is being carried out, which will take three (3) months. Once the TIA has been carried out, we will present its results, inviting the Honourable Member as well, so that we can discuss what can be done in terms of contraflow or widening, whichever the Honourable Member needs, and we will discuss together with all the agencies involved. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

Goh Choon AikPKR · PHBukit TambunEN

Supplementary question. Thank you to Tanjung Bungah. I am interested in the proposal for BRT from Permatang Tinggi to Seberang Jaya. Has this proposal been given a more detailed plan, and who will bear the construction cost for this proposed project?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. Projects under the PTMP are usually borne by the State Government, and the method of financing is through land reclamation projects that we carry out at PSR (Penang South Reclamation). However, there are also components that we may, that we may apply to the Federal Government for, for example the ERL and also the LRT, so that we can speed things up. Moreover, the State Government of Penang is among the contributors to GDP and also a major economic and tax contributor to the Federal Government. So we also hope to receive an allocation to implement these projects. As for the BRT project asked about by the Honourable Member, there are some details, such as 17 stations that have been identified, for example Permatang Tinggi, Asas Murni in Taman IKS Bukit Minyak, Taman Juru Jaya and others. This list, I can give it to the Honourable Member. However, a detailed study has not yet been carried out; once the detailed study is carried out, then we can finalise the details. But for now, based on the earlier study, there is indeed a working draft of a route. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. Now, moving on to the next question: the Honourable Member for Seberang Jaya. Seberang Jaya is not in the House, so the question will be skipped. Question 25: the Honourable Member for Teluk Bahang. Teluk Bahang is also not present. The question will be skipped. And next, I would like to invite the Honourable Member for Berapit.

Heng Lee LeeDAP · PHBerapitEN

Thank you, Dato’ Speaker. My question is Question 26 No. 26. State the status and plans for the "Car Free Day" in the Island and Seberang Perai areas.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Good morning and greetings to Dato’ Speaker, and to my colleague from Berapit for the question regarding the status and plans for Car Free Day in Penang. Dato’ Speaker (with permission)…. Car Free Day is an effort by both local authorities in Penang to foster sustainable awareness among the people of Penang since 2015. On the island, this programme is held every Sunday in the Lebuh Pantai area by MBPP. On that day, local residents have the opportunity to practise a sustainable lifestyle through cycling programmes and sales activities along Jalan Lebuh Pantai. Besides that, Car Free Day also attracts the interest of local and foreign tourists to take part in the activities held. However, Dato’ Speaker, the Car Free Day activity has been cancelled during the COVID-19 pandemic. For the Seberang Perai area, Car Free Day is held at Jalan Todak in Bandar Sunway, Seberang Jaya, on the first Sunday of every month. And the Seberang Perai Car Free Day was also temporarily halted to make way for construction work on the additional building of the Sunway Carnival shopping centre. And the State Government indeed plans to hold Car Free Day again in stages, given that the country has now entered the transition phase to COVID-19 endemicity. Thank you.

Speaker (Speaker)

Terima kasih.

Heng Lee LeeDAP · PHBerapitEN

Thank you, Honourable Member for Datok Keramat. Indeed, this Car Free Day is a very good pioneering programme in Malaysia, starting from the local authorities on both the island and the mainland. And as I understand it, Car Free Day is an international programme that began in 1998 in France. It is not only a programme in itself, but also a programme to encourage love for the environment. And in Penang, I think this is also a programme that encourages tourism. My question is, what is the plan of the State of Penang, when is the fixed date so that we can restart Car Free Day, given the high demand from the public? My second question is, the mainland, the side across the water, is a very large area covering the north, south and central parts. So, if possible, is there a plan so that the Car Free Day concept can reach not only Sunway Carnival, but also the north and south, so that the public can appreciate and enjoy this? Thank you.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Dato' Speaker, when we launched Car Free Day in 2015, the most important thing among others was to ensure that it was aligned and in line with Penang's mission to become a Green, Clean, Healthy and Safe State. Therefore, we made the decision to take that decision. That time, of course, we did not see that the COVID-19 pandemic would hit the entire world, not only here. So, we had to stop that event for the time being. But your question is very valid because now we are not only moving into the transition to endemic, where many sectors can be opened, but I want to state that we are also experiencing a climate crisis. And that climate crisis requires more programmes of this kind. So, we will

do our utmost as I answered earlier. Now we are in stages of restarting, Dato' Speaker, on the island and also on the mainland side. And I agreed with you, YB. Berapit. If we can expand to other places, then we will see whether that can be done, because they are looking into re-opening. And what is important is also, as I said, the mainland of course is a very vast and large area, and I will certainly ask my two Local Authorities (PBT) to look at how we can look at other places. And I hope, Dato' Speaker, I will advise my two PBTs that it can be started as soon as possible. Thank You Very Much.

Speaker (Speaker)EN

Thank you, the Honourable Member for Bukit Tambun.

Goh Choon AikPKR · PHBukit TambunEN

Thank you, Honourable Member, Dato' Speaker. My question is Question 27. No. 27. Describe the chronology and status of the Sungai Perak Raw Water Transfer Scheme (SPRWTS). (a) State the current daily water consumption volume and the projected requirements for the next five (5) years. (b) What are the short-term measures to address the water crisis in SPS? (c) Why is the Penang Water Supply Corporation (PBAPP) not planning to treat raw water from Sungai Kerian?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker, and thank you, the Honourable Member for Bukit Tambun. The Honourable Member for Bukit Tambun asked about the chronology and also the status of the Sungai Perak raw water transfer scheme. For the chronology, I will provide it in an attachment on the table. For the status, Honourable Member, a meeting was held on 1 March 2022 between the Penang State Government and the Perak State Government. This was a meeting between the heads of both governments, namely the Y.A.B. Chief Minister met with the Y.A.B. Menteri Besar of Perak to discuss the Sungai Perak raw water transfer scheme, and the meeting agreed to wait for the results of the final study report by the Ministry of Environment and Water (KASA). Following that, the Y.A.B. Chief Minister of Penang sent a letter to the Y.A.B. Minister of KASA dated 4 March 2022, stating that KASA's involvement is needed to make the proposals put forward successful, in order to obtain the agreement of the Perak State Government. The Technical Committee Meeting for Study No. 4/2022, held on 7 April 2022, was attended by KASA's Water Supply Division, which presented the draft final report on option evaluation and the engineering pre-design study for the proposed project. The representative of the Perak Water Board asked KASA to take into account development at the downstream side in this study report. So that is somewhat the status of the project. We still hope that the ministry can play a bigger role to ensure the continuity of water for both the State of Perak, particularly in the northern part,

and also the State of Penang, which, as the Honourable Member knows, in SPS we really need it. If we have a water transfer project from Sungai Perak, the problem can be resolved. The second question, Honourable Member, PBA has consistently recorded high water consumption in the State of Penang for the past three months, while striving to implement dry weather control to preserve the effective capacity of the Penang dams. Up to the latest record, namely 31 March, metered water consumption is nearly 900 million litres a day, which is far above the 2021 average of 860 million litres a day. In other words, water consumption has increased. Based on the latest study, the projected water demand for the State of Penang for the next five years' requirements is 1,402 million litres a day by 2025 and 1,532 million litres a day by 2030. The next question, Honourable Member, the list of water crises faced in SPS. The situation faced by residents in SPS is actually something very distressing, and the State Government also feels regret and sympathy. Nevertheless, the State Government has directed PBA to take immediate actions to address the issue at hand, namely the very low water pressure especially during peak hours. Therefore, PBA has implemented several measures and will implement several additional measures. Among the short-term measures that have been taken, PBA has placed 34 static tanks, both belonging to PBA and to other parties, which were placed, some of them donated by YB.-YB. as well. 34 static tanks were placed in affected locations, filled through four PBA water tanker lorries as well as water tanker lorries borrowed from MBSP, the Volunteer Fire Brigade, and so on. Second, PBA has carried out a contingency plan for the SPS water supply in the industrial areas, where the water supply to industrial areas will be reduced and diverted to the SPS residential areas from 6.00 p.m. to 6.00 a.m. However, we also acknowledge that the results have not yet been very effective and there are still areas that do not receive sufficient water pressure. Some may only get water at midnight. So this is not encouraging, Honourable Member, and PBA is still in the process of adjusting the valves involved to ensure the water flow can be delivered. But in addition to that, Honourable Member, we have also held further discussions, and PBA has agreed to install booster pumps at strategic locations to pump water to the affected areas. So PBA is identifying the best locations and will install them as quickly as possible after carrying out procurement for the pumps. But we will do it as an emergency procurement. We hope we can get the pumps in the nearest possible time and they will be installed immediately. And finally, PBA will also upgrade the Bukit Panchor Water Treatment Plant urgently so that we can increase the water supply in SPS. Although this water treatment plant is not large and the upgrade may only add perhaps 5 to 10 mld, five, five to ten mld will still help in those areas. In addition to that, Honourable Member, for your information, the Board of Directors of PBA has also decided not to support the approval of KM in industrial areas as long as developers do not build service reservoirs to ensure sufficient water supply. We want to ensure that if factories are to be built, if industrial estates are to be built, all conditions must be complied with, especially service reservoirs, Honourable Member. Okay, the last question, Honourable Member. There are many questions from the Honourable Member for Bukit Tambun regarding Sungai Kerian. In fact, in the Sungai Perak raw water transfer scheme, the proposal is to take raw water from Sungai Kerian but supplemented with water from what we transfer from Sungai Perak. Without water from Sungai Perak, Sungai Kerian would need to be looked at in more depth, because there is a difference in terms of water quality and also whether the water is sufficient during the dry season. That is what is feared. Sungai Kerian certainly has a lot of water during the rainy season, but we need water during the dry season, and at that time we see that Sungai Kerian may not have sufficient capacity. But that is something we may consider and examine more thoroughly. Honourable Member, thank you.

Speaker (Speaker)

Terima kasih.

Goh Choon AikPKR · PHBukit TambunEN

Dato' Speaker. Thank you to Tanjong Bunga. Just now, the Honourable Member for Tanjong Bunga touched on the rate of water capacity usage increasing compared to the normal situation. Therefore, can Tanjong Bunga explain the average effective water capacity at the Telok Bahang, Air Itam, Mengkuang dams and also the Sungai Dua Water Treatment Plant for last April. Secondly, can the raw water at Mengkuang Dam help address the water crisis in SPS, although we are well aware that Mengkuang Dam is a strategic dam used only as storage. Finally, there has been much talk lately about seawater desalination. Therefore, I would like to get the status of the desalination study at Pulau Aman. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, the Honourable Member for Bukit Tambun. The Honourable Member for Bukit Tambun asked for statistics on the effective capacity of our dams in April. I do not have April, but I have up to today. Up to today, the effective capacity for the Air Itam Dam is 26.5 per cent, which is very critical, Honourable Member. We hope rain will fall on that dam. And for Telok Bahang it is 57.7 per cent, while for the Mengkuang Dam it is 91.8 per cent. So I will focus on the second question, which relates to the Mengkuang Dam. As the Honourable Member is aware, I mentioned earlier that the Mengkuang Dam's capacity is indeed large and the Mengkuang Dam is a strategic dam. Actually, I want to inform the House that the problem is not a lack of raw water. The problem we are facing in SPS is that the water pressure drops after Bukit Minyak. So the issue is not that there is insufficient raw water, but water consumption is very high. As I mentioned earlier, consumption is the highest. Even in terms of domestic use, it is at a record high. We have never had a record water consumption of 305 litres per capita per day, and since 1999, when PBA began these statistics, it has never reached 300. Now it is over 300, and that is very much so. So, in addition to that, when the economy reopens, we see its water demand. If we speak simply, the water is not enough to reach [the areas]. The water supplied from Sungai Dua is indeed sufficient, but it has been fully used. So that is what we will consider for booster pumps. This will help to channel water to the SPS areas. Actually, the problem we face is that there is not enough pressure for it to reach. So in terms of raw water from Sungai Muda, it is actually sufficient, there is no problem in that respect, and water from the Mengkuang Dam will be used when the water from Sungai Muda is not sufficient. So for now we do not need that yet, because it is not a raw water problem, Honourable Member. If there is a production problem of water at the Sungai Dua Water Treatment Plant, perhaps that is when we would need more raw water, and we will take it from the Mengkuang Dam. So I just wanted to explain this. Thirdly, Honourable Member, you asked about desalination at Pulau Aman. I understand there are several improvements being made, and tenders are being conducted to make some adjustments, as after their study, it was found that changes need to be made. If the Honourable Member wants more detail, I can ask PBA to provide it. Thank you.

Speaker (Speaker)EN

Thank you. Batu Lancang. Please.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, my question is Question 28. No. 28. Volunteer services are very much needed in emergencies such as pandemics or disasters, for example floods. (a) Does the Penang State Government have data on volunteers across the state, and how can they be contacted? For example, is there a dedicated hotline like 999? (b) Are these volunteers trained and always ready to be called upon in the event of a disaster?

Phee Boon PohDAP · PHSungai PuyuEN

Thank you, Dato' Speaker. Dato' Speaker, I seek permission to answer Question 28 together with Question 53 from the Honourable Member for Machang Bubuk.

Lee Khai LoonPKR · PHMachang BubukEN

No. 53. To what extent is the State Government prepared to face natural disasters and reduce the risk of making Penang resilient? (a) Explain the role and list the number of meetings held by the District Disaster Management Committee by district, as well as the issues. (b) How can bureaucratic red tape be reduced in efforts to manage natural disaster crises?

Speaker (Speaker)

53?

Phee Boon PohDAP · PHSungai PuyuEN

The purpose of the question is the same.

Speaker (Speaker)

Boleh, sila.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you, Dato' Speaker. Community volunteers in Penang are very caring and help the whole State of Penang with welfare, safety, emergencies, natural disasters, floods, storms and fires, including mutual cooperation (gotong-royong). They are always on the ground. The Government greatly appreciates the prompt assistance of these volunteers. They have set up their communication system with the community, and for the Government, the volunteer data in the Penang Green Council list that is currently assisting disaster management in the development of data supply is as follows. I will leave this information with the Honourable Member. The State Government has a dedicated 24-hour line, 04-2810110, for the COVID-19 pandemic. Apart from that, the hotline of the Penang Island City Council (MBPP) is 04-2637637, and that of the Seberang Perai City Council (MBSP) is 04-2696969. The number of youth volunteers registered with the Penang Youth Development Body (PYDC) is 2,200, and the number of women volunteers registered with the Women and Family Development Committee (JPWK) is 494. Community volunteers always have refresher training courses as well as for new members. The Penang Green Council, which is responsible for the Penang Green Agenda, is helping with awareness and engagement with the community and industry, and has begun training, especially for emergency assistants who use AED, CPR and First Aiders, including disaster preparedness, for the Penang Chinese Chamber of Commerce Youth Section - Young Entrepreneurs Section (Yes) on 9 April 2022. This course aims at "Training of Trainers", hopefully so they can help train their members. The Government also raises awareness among factories, hoping they can set up an "Emergency Respond Team" in their respective companies. As for the extent to which the State Government is prepared to face disasters and reduce risks to make Penang resilient, this has indeed been a topic constantly under discussion for the past five (5) years. Now we have set up a unit, the Disaster Management Unit, which is chaired by Dato' SUK himself. Here, we follow the Central Government's policy, namely MKN 20. MKN 20 is also divided for the states, meaning to establish policies and, at the district level, the enforcement of policies and also preparedness for these matters. Here, also, before any incident, with the data collected by the Penang Green Council, we have divided it such that in the months from April to August, we are prepared for the monsoons, the North-South Monsoon, North-West Monsoon and also the South-West Monsoon, where winds blow from the Indian Ocean. Trees will be uprooted and so on. Therefore, in this preparedness, we have pruned the taller or larger trees so as to avoid trees falling during the monsoons. We have done this and it does not solve everything, but most of it has been addressed. From August, September to December, we face the rainy season in Penang, and from December to March, we face the dry season, where there are fires. All this is downloaded data. We also appeal to all Honourable Members to set up an ERT team through MPKK, and I also always, although many do not take up this duty, want to establish a village profile, a KADUN profile, so that we can. I want to extend a thousand thanks to my colleague, especially in Datok Keramat, where whenever there is a flood, he can provide accurate information: in this village, who is the head of household, and also how many people need food. All this has been established. Therefore, although we try to be prepared for disasters, there is one thing we sometimes do not know how it will come, but we must have a basis, we must have a basis to face it. Thank you, Dato' Speaker.

Speaker (Speaker)EN

Thank you. Batu Lancang, please.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, supplementary question. The Penang2030 volunteer programme is one of the State Government's initiatives to recruit volunteers. So far, how many people have registered under the Penang2030 Volunteer Programme? The second question, how many volunteers are registered under government agencies? And my third question, what is the difference between volunteers under government agencies and under NGOs?

Phee Boon PohDAP · PHSungai PuyuEN

It is true that compared with the private sector, the government has fewer resources and so on. The private sector also has its own systems for handling anything that happens. For volunteers registered with PYDC, based on my data, the figure is 2,200. And for women it is 494 under JPWK. The State Government wants to, and is doing so through the Honourable Dato' TKM I, who has begun giving training at MPKK…(interruption).

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, my question is about agencies, not the number of people. Agencies registered under the Government, agencies, not the number of people.

Phee Boon PohDAP · PHSungai PuyuEN

No, is it government agencies or NGOs?

Ong Ah TeongDAP · PHBatu LancangEN

There are three (3) questions in all. The second question is, what is the total number of volunteers registered under government agencies? I mean the government. And the third question is about volunteers under government agencies and under NGOs, and the difference between them.

Phee Boon PohDAP · PHSungai PuyuEN

Good. Under agencies, there is indeed a basis under National Security Council (MKN) Directive 20. MKN Directive 20 does have its own system, but I feel and believe that this MKN is not comprehensive. It must also involve NGOs, because as I said, these NGOs have more expertise. They are always there, they have resources and so on. All government agencies must be under MKN Directive 20, where if anything happens, and if it is in the district, the District Officer (Tuan DO) will be the chairman, the District Police Chief will be the Commanding Officer, and the person to carry out the duties is the Deputy Director of the Fire and Rescue Department (BOMBA) and prevention. That is MKN Directive 20.

Lee Khai LoonPKR · PHMachang Bubuk

Soalan tambahan.

Speaker (Speaker)

Sila.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Dato' Speaker. Thank you to the Honourable Sungai Puyu, who answered half of my question, because I have further questions, which are (a): the role and number of meetings held by the District-level Disaster Management Committee, and what issues have been addressed. Were any meetings ever held at district level, District Disaster Management? Second, a question of mine that was also not answered: how can bureaucratic red tape be reduced in efforts to manage natural disaster crises, given that the Honourable Member also mentioned earlier that many agencies are involved, but what is important is how the government plays a role in coordinating these agencies, including NGOs or volunteers. But the main character is not us relying on volunteers; they can only help, but the main character should be led by the government at the district office level and also by government agencies. So how can we coordinate more effectively? Because this is a question I wish to put forward. Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

Yes, as I explained earlier, at the state level, the state will be chaired by Dato' SUK, and all government agencies with an interest in the matter will be invited. As for me, I said that for the operations chief, at the Penang CPU, the Royal Malaysia Police (PDRM) must be present there. For implementation, the Director from BOMBA must be present. Even for this at the district level, for preparedness. Earlier I gave an explanation that we need data, seasonal data, such as when the dry season comes, when the dry season comes, what do we do? And indeed the District Office always gets ready before the season arrives; they are already prepared to face the coming season. This already exists. If you want to count how many preparedness exercises there have been, usually during district action meetings, these issues are also discussed. There are many issues because it is still overlapping, from time to time. And usually, if it is the flood season, before that we, the District Office, will hold meetings and ask all the MPKK to check their halls to be temporary evacuation centres. All of this must be done. If you want to count, I will give full information on when they meet, which month they meet. This is indeed so. What people call bureaucracy, there is actually no bureaucracy, because when managing a disaster, the chain of command is there. Chain of command, you cannot run disaster operations without it. The most active part, as people say, is still the NGOs. We have seen the Penang NGOs, they are very experienced. Look at how the NGOs in Penang are always ready to help. Recently, in Selangor and in Pahang, whose flags were flying? Most of them were from Penang. So indeed, they play a very important role. Therefore, before any incident, assistance and operations with the NGOs must be strengthened. I want to thank the Honourable Chief Minister, who has provided many facilities to, for example, the Volunteer Fire Brigade, the Security Forces and also the CERP. This is already prepared…(interruption).

Lee Khai LoonPKR · PHMachang BubukEN

Honourable Sungai Puyu. What I asked is about disasters, not about the flash flood issues. I know that the District Office or the District Action Committee does play a role, but what I asked is, that's why we do not have many disasters in Penang. The most recent one perhaps was what happened at Pulau Burung. That can be considered a crisis, an open burning that went on for so long. That is what I just want to know, how it was handled. The Disaster Committee, not the fallen trees. I know there are government officers who are all doing their work. The bureaucracy does act quickly, but what I meant is disasters, disasters are not that many. In 2017, there were. That is all.

Speaker (Speaker)EN

Thank you, Machang Bubuk. I would like to invite Kebun Bunga.

Phee Boon PohDAP · PHSungai PuyuEN

I have to answer her question because she wants to know.

Speaker (Speaker)EN

She is for the second time, the Honourable Member stood up without a supplementary question. It's alright. Please, Kebun Bunga.

Jason Ong Khan LeePKR · PHKebun BungaEN

Thank you, Dato' Speaker. My question is number 29. No. 29. Whether the Padang Tembak flats can be redeveloped or renewed through the private funding initiative (PFI)?

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

I thank the Honourable Member for Kebun Bunga for the question on redevelopment or urban regeneration in the flats in his constituency at Padang Tembak, whether it can be done through the private funding initiative or PFI. Dato' Speaker, the Padang Tembak Flats is one of the sites that has already been identified for urban renewal or urban regeneration development planned under the Master Plan for the Development Planning of the Penang State Housing Board 2021-2025, also known as Rumah Mampu Milik Penang (RMMPg) or Penang Affordable Housings (PAH). This falls under the new Housing Board, which we began operating last January. So, it is part and parcel of our plan, we have five (5) sites, and this is one of them for urban regeneration. Among the matters we need to give attention to are the resident relocation plan, design, density, and the new facilities and amenities that need to be provided in the area to be redeveloped. The application for this project has already been submitted to the Federal Government during the Twelfth Malaysia Plan for financing the redevelopment costs in the area, but we are still waiting for their decision and we are following up with them. So financing the redevelopment of Padang Tembak Flats through the Private Financial Initiative or PFI is indeed of concern to us, it is a proposal we must take into account, but we also need to look at many other matters such as the cross-subsidy we would have to bear, which is high, apart from many technical issues in terms of development, such as how much density can be given to the developers who will come in, and so on, especially for Padang Tembak because it is one of the biggest projects out of the five that we have for urban regeneration, Dato' Speaker. So, through the first product of LPNPP, namely through RMMPg, we plan the urban regeneration project at Padang Tembak Flats for the implementation of Phase 1, which we expect the planning to be finalised by 2023, and after that we will continue with the implementation. In fact, for information, just a little update, we have indeed identified in that area a plot of land which we are looking at, is more clean nature, for the first phase to begin, so we are moving on as we speak. Thank you, Dato' Speaker.

YB. Yang di-Pertua Dewan Undangan Negeri. Thank you. Kebun Bunga. Please.

Ong Khan LeePKR · PHKebun BungaEN

Thank you, Dato' Speaker. Thank you very much to the Honourable Dato' Keramat, who is very concerned about the redevelopment of Padang Tembak. We already know that the Padang Tembak flats are more than 50 years old. So my supplementary question is whether the State Government will give priority, the first priority, to rebuilding or urban regeneration, as what Datok Keramat has said, 2023, the first priority for this project to kick off. That is my question, Dato' Speaker. Thank you.

Sememangnya seperti mana yang saya nyatakan Dato’Speaker just for information kita ada 5 tapak yang telah pun kita kenal pasti iaitu di bahagian pulau kita ada di Padang Tembak is number 1, kita ada di Taman Free School, kita ada di Mahsuri dan di bahagian Seberang kita ada

dua iaitu di Mak Mandin dan Jalan Siakap. The the quickest one that we looking at will be at Mahsuri and Bayan Lepas area Dato’ Speaker 5 blok di mana it’s is only around 300 unit that we have to relocate and do the process berbanding dengan Padang Tembak yang ada lebih daripada 3000 unit yang mana kita perlu lihat dalam 9 blok, so that is issue so but anyway Padang Tembak like I said kita sudah pun kenal pasti satu tanah di mana kita boleh bina semula and then do the relocation process just like Mahsuri that is MT lot by the 5 point blok where by in fact kebetulan pada hari minggu baru kita ada satu sesi libat urus dengan penduduk again after many rounds we are going through agains because we wants to starts that project very early RFP is going very call soon and we want a get the input daripada penduduk. So, the same things will happen to Padang Tembak but there is a timeline especially because of the skills of that particular’s housings scheme, Dato’ Speaker.

Speaker (Speaker)

Terima kasih.

Ong Khan LeePKR · PHKebun Bunga

Dato’ Speaker. Penjelasan jadi terima kasih Dato’ Keramat, cuma tentang isu pemindahan penduduk. Mungkin kita boleh mulakan dengan Blok J dan Blok E yang dimiliki oleh Kerajaan so it’s easier to relocate sebab mereka semua sewa daripada kerajaan sahaja then we can be 1 blok and 2 blok so that be model for all. Terima kasih Dato’ Speaker.

Speaker (Speaker)EN

Not a supplementary question.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Dato' Speaker, thank you. My supplementary question is not about Padang Tembak but…(interruption).

Speaker (Speaker)EN

You must know this. The Honourable Machang Bubok, next.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Dato' Yang di-Pertua. My question.

Speaker (Speaker)EN

Honourable Member, go ahead and grill me.

(YB. Lee Khai Loon): My question is No. 30. No. 30. How can we ensure that water/electricity supply is sufficient to meet the needs of Penang's high technology industry? (a) List the water/electricity supply needs by industrial area as well as forecasts for the next five (5) years. (b) Explain the electricity disruption issues and buildings that have been completed but have no electricity supply at the Bukit Minyak Industrial Area.

Speaker (Speaker)EN

Please, please answer.

Thank you, Dato' Speaker, and the Honourable Machang Bubuk. The State Government is aware that, as a state whose main economic activity is the industrial sector, the supply of water and energy, and other alternative energy sources, are very necessary to guarantee the arrival or determine the coming of domestic and foreign investors to this state. The State Government is also aware that in the present situation, where issues of climate change, weather change, and also when wars occur, we see countries and states beginning to move towards food security, water security and so on, which causes every state to need to ensure we have self-sufficiency and also, with respect, the level of self-reliance for a state. The planning to ensure that water and electricity supply is sufficient to meet the needs of Penang's High Technology Industry is as follows. The Penang Water Supply Sdn. Bhd. (PBAPP) has implemented and is also planning several initiatives to ensure we continue to upgrade water infrastructure and also need to find additional raw water supply sources to ensure the sustainability of the State's water supply. The Third Twin Undersea Pipeline Project, 2 x 1200 mm, began operating in November 2020. It is capable of supplying 315 million litres of treated water per day from the Sungai Dua plant to the areas around the island. This project cost RM 114.3 million. On 1 March 2022, the delegation of the Penang State Government, led by the YAB Chief Minister, met with the delegation of the Perak State Government led by the Right Honourable Menteri Besar of Perak to discuss the Perak River Raw Water Transfer Scheme (SPRWTS). The meeting ended with both parties agreeing to wait for the final report results of the KASA engineering study. Taking into account the SPRWTS scenario, namely the transfer of raw water from the Perak River, this negotiation, the Penang water authority recommended desalination, desalination of sea water in Penang to meet the demand for raw water supply in the future after 2030. PBAPP has drafted and implemented the Raw Water Contingency Plan 2030 to ensure the security of Penang's water supply (RWCP 2030) is part of the Penang Water Supply Initiative 2050. PBA plans to upgrade water treatment plants, build new water treatment plants and explore the Perai River as an additional raw water source for Penang. Five (5) major water supply engineering projects under RWCP 2030 will be started from 2022 to 2028 as follows:

1. Phase 2 upgrade of the Water Treatment Plant Sedimentation Tank (91 million litres per day); 2. Package 12A, Sungai Dua WTP additional new water treatment module (114 million litres per day), 3. Phase 1 Mengkuang Dam WTP (114 million litres per day); 4. Phase 1 Sungai Muda WTP (114 million litres per day); and lastly 5. Perai River Water Supply Scheme (136 million litres of water per day). Any water supply disruptions and the implementation of water supply projects carried out in the State of Penang are to fulfil the "No Water Rationing Policy". The main objective of this policy is to ensure continuous and quality treated water supply to all industrial and domestic users 24 hours a day. PBA always recommends a minimum storage capacity of one day for domestic users and a minimum storage capacity of two (2) days for industrial users according to the type of premises as stipulated in the Water Services Industry (Reticulation and Pipe Installation) Regulations 2014, to overcome shortages of water supply during pipe repair works and drastic upgrades for the short term in the reticulation pipe network. Electricity Supply. TNB has planned an appropriate supply method to ensure electricity can be supplied to users in accordance with the guidelines and regulations laid down by the Act and enforced by the Energy Commission (Suruhanjaya Tenaga). In 2021, Penang's water supply output was 1,222 million litres of water per day. The projected water demand for Penang in 2025 is expected to be 1,402 million litres per day, and subsequently 1,532 million litres per day. By 2030 there is no specific projection made by industrial area. Returning to electricity supply, TNB will place emphasis on the electricity supply projects for the Science Park and Bukit Minyak industrial areas, and the status of the applications is as follows: 1. There were 11 electricity supply applications received in 2020. All 11 projects have been issued with the Consumer Connection Charge (CSP), of which 9 projects have commenced operations and the remaining 2 projects are under implementation on site and are expected to be completed in the near future. For 2020, the total Maximum Demand was 6,981 kilowatts; and 2. There were 19 electricity supply applications received in 2021. All 19 projects have been issued CSP, of which 9 have commenced operations and the remaining 10 are still under implementation, covering the requirements for excavation permits and on-site work. For 2021, the total MD was 16,649 kilowatts; 3. There were 12 project applications received in 2022. Eight (8) projects have been issued CSP and are in the process of on-site implementation, covering the requirements to obtain excavation permits and on-site work. Another 4 projects are still under TNB action to issue CSP, and for 2022 the total maximum demand MD is 8,963 kilowatts. Through checks with TNB, it was found that there were no reported cases of electricity disruption in the Bukit Minyak industrial area, and so far, all new projects in the area have been able to be supplied with electricity. In addition, all new applications will be supplied with electricity by referring to the TNB guidelines and the Electricity Supply Act regulations.

Speaker (Speaker)

Sila.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Dato' Yang Di-Pertua. Thank you, Batu Maung, who has answered my oral question. I have two (2) supplementary questions. The first is related to the planning permission for the construction of new factories, which Tanjong Bunga just mentioned earlier, where previously factories could be placed, what Tanjong Bunga just mentioned is that factories that want to build new must submit a planning permission, and the condition to obtain planning permission is to build storage tanks. I want to know how large the storage tanks are, or whether previously existing factories were not required to build such storage tanks. Yes, that is my question. The second is regarding desalination, yes, that desalination, which under if the SPRWTS cannot be implemented, then the Government will carry out desalination. So, my question is, because the current issue related to SPRWTS is that we, Penang State, we do not want to buy treated water, we only want raw water, but the cost of treated water I think is also, if compared to desalination…(interruption).

Speaker (Speaker)

Desalination.

Lee Khai LoonPKR · PHMachang BubukEN

Desalination would be far cheaper, indeed. So I want to ensure why we do not want to buy treated water from the State of Perak when we are going to use this desalination technology to supply water to the State of Penang.

Speaker (Speaker)

Sila.

Thank you, Honourable Member for Machang Bubok. As for the pump tank issue, I understand that the industry needs to provide 48 hours of storage capacity for when repairs are carried out. That is one point. The second point is that the negotiations with the Perak State Government are still ongoing. Let us wait for the outcome of the next round of negotiations…(interruption).

Y.A.B. Chief Minister: I ask for permission to give an update. In fact, during the negotiations on 1 March, the position of the State Government was conveyed to Perak that the State of Penang is ready to receive treated water if this project is approved.

Speaker (Speaker)EN

Thank you. I would like to invite the Honourable Member for Pulau Tikus.

Lee Chun KitDAP · PHPulau TikusEN

Dato' Speaker, my question is number 31. No. 31. Does the State Government plan to help young people individually in the entertainment or arts business, and not only through companies? (a) Is the State Government prepared to support new sports or combat entertainment initiatives such as Mixed Martial Arts (MMA) and professional wrestling, and not only traditional entertainment?

Speaker (Speaker)

Terima kasih.

Soon Lip CheeDAP · PHBagan JermalEN

Dato' Speaker, and thank you for the question directed by the Honourable Member for Pulau Tikus. Various initiatives have been carried out by the State Government to help young people in the entertainment or arts business, whether individually or through companies. The State Government, through cooperation between PYDC, has carried out several initiatives as follows; firstly, i. the Youth with Rhythm programme: Penang Youth Music Talent. ii. Youth with Rhythm: Open Mic, which is one of the platforms for young people to showcase their hidden talents before the public in singing, dancing, playing musical instruments such as the violin, playing traditional musical instruments and so on. The organisation of this programme is also to identify and nurture young people's talents and to help them build networks with event organisers to perform. In detail, talented young people will be identified through assessment by a panel of judges and also by music production bodies in Penang that are working together with the State Government and PYDC to make this programme a success and also to assess young people's talents. Young people and musicians in areas often used as busking spots are also invited to take part. The Open Mic programme has been held three (3) times. As of 20 May 2022, a total of 76 young people have registered to take part in the platform, comprising 29 individuals and 8 groups. Youth with Rhythm: Youth in Music – Musician Sharing Session (MSS). A Musician Sharing Session (MSS) will be held starting June 2022, in which professional musicians of Penang will be interviewed to share their personal experiences as musicians. Among the topics to be covered in this programme are sharing on the academic field of music, vocal music makan, musical equipment, and the experience of a lyricist sharing in the process of preparing song lyrics.

The State Government is prepared to support new sports or combat entertainment initiatives, the question directed by Pulau Tikus, such as Mixed Martial Arts (MMA) or professional wrestling, through cooperation between the State Sports Association and the Penang State Sports Council in organising international-standard championships such as the Penang Combat Festival, and will also organise it in conjunction with the Penang Festival at the end of 2022 to give exposure to athletes of the State of Penang. Among the combat sports to be contested are boxing, silat, Muay Thai, judo, karate and taekwondo. This programme has also attracted interest from foreign participants such as those from Thailand, Singapore, Japan, Taiwan and Indonesia to take part.

Speaker (Speaker)

Terima kasih.

Lee Chun KitDAP · PHPulau TikusEN

I ask for a supplementary question. Thank you, Honourable Member for Bagan Jermal, for that explanation, but what I want to ask, I just want to ask the question and clarification, what I mean is, will the State Government support if new ideas are brought to the attention of the State Government to be supported, because if the arts today may come from outside the traditional, outside traditional arts, or what I mean by traditional, meaning not mainstream arts but new ones, the new trends? If young people come to the State Government, will the State Government support them? That is number one. Number two is that Mixed Martial Arts and/or professional wrestling are mostly not within the purview of the sports council, because this is an alternative sport that has not yet taken hold in our country, but in countries like Japan and the United States of America it is already well established. Therefore, I ask, if it is outside the purview of the mainstream sports authorities, will the State Government also support being a pioneer in this country? That is all, thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the supplementary question directed by Pulau Tikus. Indeed, in terms of the arts category, many young people will experiment with new arts, and indeed the State Government, in terms of supporting performances or the arts industry, is open and will support if there is a new arts industry brought to the State Government by young people. The second supplementary question, which I will answer for Pulau Tikus, indeed in terms of State Government initiatives, apart from associations and arts associations or arts clubs for self-defence in the State of Penang, there are also many NGOs or associations and state sports bodies that have registered with us. Including clubs too. In the State of Penang, or through registration with the Office of the Sports Commissioner, the online status check system, up to 9 May 2022, there are a total of 146 types of state sports bodies that have registered, of which 9 involve state-level martial arts associations and 115 clubs or Non-Governmental Organisations (NGOs) registered under JPS.

Speaker (Speaker)

Terima kasih.

Syerleena binti Abdul RashidDAP · PHSeri DelimaEN

I have a supplementary question. Since this question is related to my written question, I am very interested in the initiative taken by the State Government, so the Penang Combat Festival can, I think, highlight our talents. Local talents in Penang are many, as I am a former practitioner and also a trainer in combat sports, particularly Muay Thai, I understand the shortcomings that have occurred in this field of sport. But at the same time we can look at it in terms of, (with permission)…sports entertainment; it is understood that in 2014, WWE World Wrestling Entertainment held a performance in Kuala Lumpur and at the same time it was able to attract tourists, so my question is, if we can, yes, move forward, can the State Government look at this sports entertainment field as a step to generate… (with permission), profit for the economic sector that can help develop Penang, and secondly, as a step to prevent drug abuse from spreading, and I think this way we can help young people more.

Soon Lip CheeDAP · PHBagan JermalEN

An excellent supplementary question directed by the Honourable Member for Seri Delima. I do agree that sport is not only for the good health of a citizen, but can also help in the tourism sector, as we promote not only sports entertainment…(with permission), but also sports tourism, because by organising national or international competitions we can attract tourists or participants from abroad to come together with their family members and help develop the economy of the state and also the country. In terms of performances or competitions, the State Government under the State Executive Councillor for Youth and Sports, and also the MSN, is prepared to organise more programmes at national or international level. Thank you.

Speaker (Speaker)EN

Thank you. I would like to invite Air Itam. The question from Permatang Pasir was already answered together with the third question yesterday. Yes.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Dato' Speaker, my question is question number 33. No. 33. Given that tourism activities are becoming more active, what efforts have been made by the Penang State Government to launch or increase direct flights?

Yeoh Soon HinDAP · PHPaya TerubongEN

Honourable Dato' Speaker, the State Government is indeed committed and has taken the initiative to start and hold many discussion sessions with domestic and international airlines for the purpose of restoring traditional flights as well as exploring new potential direct flights. The State Government, through the PETACE office, has held several rounds of discussions with airline companies, and I am confident that the State of Penang will receive direct flights from the Middle East region before long. The State Government is still working to handle the procedures that need to be resolved with the relevant airline companies and also including related agencies such as the airport authorities. Including the Malaysian Aviation Commission (MAVCOM), including the Civil Aviation Authority of Malaysia (CAAM). In addition, the State Government also, through my office and Penang Global Tourism (PGT), works closely with the Ministry of Tourism, Arts and Culture (MOTAC) and the Penang International Airport to attract potential airlines to operate direct flights to Penang. In addition, marketing campaigns are also actively carried out by the State Government together with airlines, the MOTAC office and Tourism Malaysia to promote the continuation of international routes to Penang. The State Government also collaborates with online travel agents (OTA) to carry out promotions and strengthen the Penang brand to increase awareness of visitation and encourage tourism to Penang. The State Government has also, through the Penang Convention and Exhibition Bureau (PICEB), formed strategic relations with airlines such as Fly, Firefly and Malaysia Airlines to consider additional direct flights from abroad, and I also believe that the Honourable Member for Bagan Dalam is very interested in direct flights from India, and I can give an assurance that PICEB is still working to discuss with airlines in India to realise flights from India to Penang, and Firefly has also positioned Penang as an aviation hub and is ready to launch direct flights to international destinations in the near future by making Penang International Airport its international operations hub for Firefly. That is all, thank you.

Speaker (Speaker)EN

Thank you. I will allow one question.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you, Dato' Speaker.

Speaker (Speaker)

Air Itam.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you, Paya Terubong. Given that Penang has so many plans to attract tourists back to the State of Penang, is the capacity of the Penang International Airport also being reviewed or we looked it to receive the tourists who will be coming to Penang? Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

This is also an issue that the State of Penang truly regrets. Recently, the former Minister of Transport, YB Anthony, also raised that the Penang Airport should have had that expansion during this lockdown, and indeed we regret that the Federal Government did not take that action. In fact, before the pandemic, the capacity of Penang Airport had already exceeded its capacity, and we hoped that the Federal Government could expedite this expansion project so that we can really cater to the capacity to come, and I am confident that we will definitely get many more direct flights, and this is indeed a major challenge.

Speaker (Speaker)EN

Thank you, Honourable Members. The one hour and 30 minutes for Oral Questions has now ended in accordance with the Rules of Procedure of the Penang State Legislative Assembly. Please, Honourable Member.

Y.A.B. Chief Minister: Honourable Dato' Speaker, the answers to the Oral Questions that have been answered will be placed on the tables of the Members who asked them and will be included in the Official Report.

Speaker (Speaker)EN

Thank you, Yang Amat Berhormat. Honourable Members, we are now in the debate or motions session. Thanks to His Excellency Tun Yang di-Pertua Negeri Pulau Pinang, who has granted consent to deliver an address to this House on 27 May, and I would like to invite Honourable Members who wish to take part in the debate session. Please. Please, Air Putih.

Lim Guan EngDAP · PHAir PutihEN

Thank you, Mr Speaker. I would like to refer to and express my support for the motion of thanks for the speech delivered by Tuan Yang Terutama Tun at the Opening of the State Legislative Assembly last week. Of course, I also want to state my support for the State Government's efforts towards Penang2030, to make Penang a Smart and Green State, in line with the effort to make Penang an internationally recognised state. If we want to make Penang a smart state, we must certainly go digital (with permission), and the digital economy is the most important component. This certainly does not only involve infrastructure, namely the provision of 5G, but also providing facilities to encourage talent not only to venture into the digital economy but also to encourage creativity, creative capacity and also entrepreneurship, entrepreneurship in that field. Here, I would like to get an explanation of the extent to which the various programmes carried out so far have been implemented in their entirety, and I say that although there has indeed been an allocation, how much has actually been spent and what is its impact and effect. We do not want what has happened at the Federal Government, where many allocations are announced, but they are not fully used, or if they are fully used, leakage or misappropriation occurs. One example, as I mentioned yesterday, is that we must remember that although the intention may be good, if implementation is not carried out in an orderly manner, then any intention will fail. As one example that I mentioned yesterday, the chicken subsidy, where RM730 million was approved but only RM50 million was paid. This is a betrayal of efforts to help not only breeders to guarantee the supply of chicken, but when such things happen, I think this causes the chicken supply to be cut off, and that is something that should not happen. So, I hope that in this aspect, when we talk about the digital economy, we hope that the good intentions of the State Government can be channelled, that the money announced can be disbursed so that its use is maximised and that we can see the impact. We know that not everything succeeds, because in this digital field, it is not something that can guarantee success. Usually, out of perhaps 10 or 20, if we are lucky, one that succeeds is already considered a fairly good performance. So, we hope that you can provide a, what is it, KPI analysis, an analysis of the performance reflected. Of course, here I want to take the opportunity to raise the matter of the Digital Library in Penang, because there was a response given to several State Assembly Members who asked why it is not open 24 hours as was intended when it was established. I hope this may be because of COVID, and I hope this can be restored so that the 24-hour service can be restored in the near future, because this is indeed a benchmark and an attraction for Penang's success as a state that built the first Digital Library not only in Malaysia but perhaps in this region that operates for 24 hours. I hope it can be continued not only on the island but also in Butterworth, and at the same time I understand that there is a request that we upgrade the facilities provided so that they do not continue to become dilapidated or outdated without being repaired, as there have been several views from users of the Digital Library in Penang. I would also like to express the hope that for the Digital Library in Butterworth, the hall can be provided with air-conditioning, because it is indeed too hot, and that is why it is difficult to rent when conditions are not favourable and the weather is quite hot. I understand that the Honourable Member for Bagan Dalam has already made a request, and we hope that this matter can be given due attention so that, as I said just now, let us maximise the facilities provided to the people of Penang. For your information, the State of Penang, as a Green State, we must not only ensure that we practise, practices, we practise green measures, not only the 3Rs but we must also provide green areas, and I think that is something that makes Penang so captivating, and I also want to recognise the efforts made by the government to upgrade existing parks or recreational parks. I hope this can be expanded so that more parks can enjoy green spaces, and this is something close to the hearts of many people of Penang. I also want to know what progress has been made on the cycling lane planned to encircle Penang Island? Is the same plan also being made for the mainland side? Indeed, if we talk about a benchmark for how the State of Penang can achieve international standing, it is recreational facilities of this kind. It was once asked when Seberang Perai, if we say MBPP became a city, everyone knows it is a city, but when MPSP became MBSP, what was the difference, what measure can we use to see MPSP becoming MBSP? What is the difference? So, if there is no difference whether it is a Municipal Council or a City Council, they are the same. And that is one of the things that can make a differentiation, or a difference, namely the cycling lane, where with such recreational facilities it will uplift the quality of life of the people of Penang. In addition, I feel compelled to raise the matter of water, which is something close to the hearts of all the people of Penang, because the water supply is something that the people of Penang are very proud of. Penang is the only state in Malaysia that has never imposed water rationing. This is a record to be proud of. All states in Malaysia have at some time carried out water rationing except Penang, and we must maintain such a record. And therefore, we hope that if there are any problems, they can be given attention quickly. Surely perhaps there are one or two places that need our attention, and we hope we can get a response and reply quickly. I feel that this is the most basic or fundamental thing. In terms of water supply, it is not only subject to the supply of raw water, but it must also be looked at in terms of water demand and water supply management. If we talk about water supply management, of course it is from the aspect of raw water supply, but we must also look at the aspect of water treatment and also water pumping stations. Both of these must be given priority so that the appropriate investment is provided. We see many states facing water problems. If it is not a shortage of raw water, then there is a shortage of water treatment plants or water pumping stations. Therefore, appropriate investment must be provided. We know there are cases where treated water is sufficient, but it does not reach because there are not enough pumping stations to send the water. So, that is a logistical matter that must be addressed, and if I am not mistaken, in terms of water production, Penang has the highest water reserve, treated water reserve or treated water reserve in Malaysia, namely 30%, meaning that if we speak roughly, for every 100 litres produced, only 70L is used or demanded by consumers, and 30L, we can say, is produced without being used. It cannot be said to be wasted, but that is the water reserve. That shows that demand can still rise, so if there are any problems, they must certainly come from the water pumping stations, and not from a shortage of raw water or treated water. Perhaps the future will be different, but that is what I understand to be the current position. So, certainly, in areas like Air Putih, we have also received complaints that two or three houses cannot get water, and that needs attention so that this matter can be addressed. But whatever the problem, it clearly maintains Penang's record as a state that has never imposed water rationing. I want to express appreciation for the efforts carried out all this time, but I want to remind that let us ensure this good service is maintained, because if not, this will tarnish the good performance built all this time, and will certainly ensure that the confidence of the people in the State Government continues to be maintained. So, in this aspect I hope that PBA can not only maintain what they have achieved all this time, but can also improve the performance I mentioned, so that we achieve international standing, not only by providing water at a low price but also efficiently and cleanly, and that is the wish of all the people of Penang. There is no point in us calling ourselves a Green State if the water supply is not even guaranteed. That is the question for other states too: if water is not guaranteed, what is the point of talking about a green state? And indeed, as a Green State, I feel Penang can be proud of the recognition that it has never imposed water rationing all this time, unlike other states, where even after 40 years there are still water supply problems.

In addition, we must also give attention to the problem of floods, which has now become the main headline or the main concern among the people, to the extent that many insurance agents, who previously sold car insurance and never sold flood insurance, now find it has become a common item. Now many car owners also buy flood insurance, which shows how serious this matter is. Although Penang is fortunate not to have serious problems like other states, we hope that appropriate preparedness can be carried out. In the aspect of achieving Penang 2030, the most important factor is in terms of the delivery of services carried out, which is very important, and here I hope that we give attention to three main aspects. First, to retain the good talent that already exists. It is not easy to find talent that is experienced and also capable, and it must be retained. Second, if there is any delay in carrying out projects, action must be taken to overcome it. I have indeed received complaints that several projects being carried out are still not completed, perhaps because of COVID, but when we move into the post-COVID period, I hope this matter can be expedited. We really want to see good performance from PDC or PBA continuing, being able to carry out projects quickly and also efficiently. Especially when they carry out programmes in the Seberang Perai area. Of course, it is not only PBA; PDC is one of the State Government agencies, the most efficient state economic development agency in the country, and we want to see it continue to be maintained. Third is in terms of response or reaction to any crisis that occurs. It must be done quickly, because if it is not done quickly, it will certainly give a poor image to the State Government. We hope that government agencies, including government staff, can help to provide good and excellent service to the people, because this is what the people want. We must remember that when any complaint is made, it is not the government agency that is affected; it is the people's representatives who are affected, and surely they, or the people's representatives, must get a response from the government agencies about the problems that arise, so that at that time it is given the appropriate attention. We certainly know that any shortcomings will be reflected in the coming general election, and that is something that the people's representatives from the government side must face, and we hope it can be given attention quickly. Before I move on to another topic, I want to mention again the development of the digital economy or digital administration that I raised earlier, and I certainly understand that efforts are being made to digitalise the administration of the State Government. One aspect that may deserve special attention is at the land office. Of course, I want to appreciate the efforts carried out by the Land and Mines Office to computerise the land administration system, and we hope it can be accelerated. Certainly, the role played by the Federal Government is greatly needed, greatly needs to be accelerated, and if we look at the State of Perak, land searches can be done online, on the internet. Why not in the State of Penang? Perhaps the ministry gives priority to the State of Perak, but Penang, as one of the main states in Malaysia, must also be given due priority, not merely for other states such as Selangor or near Perak and other states, but Penang must also take its appropriate place.

I understand that if I am not mistaken, the cost of computerising the land process or land administration exceeds hundreds of millions of ringgit. I also do not know why the Federal Government needs such a huge expenditure, but that is certainly not under the State Government, not under the State Government's jurisdiction. If we want to computerise land administration and ensure that its cost can be controlled, can we get assistance from experts, not only within the country but overseas, who I think would like to make a contribution or develop applications free of charge? For example, let us look at the MySejahtera application. Hundreds of millions were spent to develop the MySejahtera application, but in countries like New Zealand it was done free of charge, and it was designed, created and provided by a Malaysian citizen who was born in Malaysia before migrating to New Zealand. Can we get assistance from these people? Because if they could build a MySejahtera system for COVID-19 as was done by a former Malaysian citizen in New Zealand, why not, if we cannot get assistance from them, such an application in Penang? This is what I propose, because if we want to save hundreds of millions in costs, as was spent, surely when costs are this high, we also do not know whether it needs such a huge allocation, and it may only benefit certain parties, when we see it can be done at such a low price or free of charge by other states. And we hope this matter is given attention by the Federal Government. But for the State Government, if we have to wait so long, or we cannot wait any longer, because the digitalisation process must be carried out now. Perhaps we must explore or look at assistance from those who have provided these services free of charge. Dato' Mr Speaker, for Penang towards 2030, a Smart and Green State, or in other words becoming an internationally recognised state, has no meaning if it does not involve the people and provide tangible benefits and results to the people. Therefore, I want to thank the Chief Minister and the State Government, who have given attention to basic development in my constituency, both Air Putih and the Bagan area. And I just heard the speech of the Opposition representatives; they also received similar treatment from the State Government, which clearly proves that the State Government does not discriminate against opposition party areas and acts fairly towards all areas, regardless of whether they support or do not support the State Government. That is something that shows that indeed the Pakatan Harapan Government is a Government for all the people of Penang, and I think that is the attitude of fairness and non-discrimination that should be emulated by the Federal Government, in line with the Federal Constitution. We regret that the Federal Government likes to play favourites in terms of development, always marginalising the State of Penang, besides discriminating against the people and liking to divide them, both among the people in Peninsular Malaysia and between Sabah and Sarawak and Peninsular Malaysia. I think this is a wrong attitude. We should uphold the Federal Constitution, which is a platform to unite the people, based on five main principles. The first is to respect the sovereignty of the law, or the rule of law, and democracy. What is the use of laws if they are not implemented equally, and they must be implemented on everyone regardless of rank or status? That is the foundation. And that applies to the State Government. Why is the State of Penang always discriminated against? I think this will harm the people and also does not take into account the very large tax contribution by Penang to the treasury of the Federal Government. So, the first must be to uphold the principles of the rule of law and also democracy. Second, we must guarantee economic prosperity for all Malaysians. Do not play favourites, as I mentioned, or be biased. This always happens where only cronies and elite groups benefit, and after it is exposed, they then play the racial card to cover up corrupt practices that occur, and this brings us to the third aspect, which must be transparent, must be accountable and fight corruption. That is a very serious matter. The problem of corruption is becoming more and more acute, increasingly acute. We know it is not only at the Federal Government level but also at the lower levels, and this must be given attention by everyone. And fourth, ensure good governance. Only with good governance will the people have a sense of belonging, that this is their country, which looks after them, and does not burden its people. And fifth, all of these must be supported by the State Government, which should be emulated by the Federal Government. The fifth and last is that we must respect all Malaysians; do not try to divide the people. Do not, for self-interest, play the racial card or religious extremism. Why keep repeatedly using scare tactics about threats from non-Malays or non-Muslims? They are also Malaysians; they are not outsiders. Give them the appropriate place. They are part of Malaysia and also love our country. So, I hope that let us be an example, where Penang, as a UNESCO World Heritage Site, is a place where all races can live in harmony, mutual respect, and mutual help. Ensure that all citizens have the same place and are not discriminated against for certain interests. We have always shown that the Opposition representatives are treated fairly. Despite different views, even the Leader of the Opposition was given the Dato' title by the State Government, and also appropriate treatment. This is as a mark of respect. There may be other differences, but we do not deny the contribution made by him, and we consider him as one of us, all sons and daughters of the state, who should be given treatment as sons and daughters of the state, but do not play the racial and religious extremism card. That is very dangerous and in the end will damage the development of the state and the nation. We see other countries, they do not play these issues, and look at their progress, whether Vietnam or Indonesia, they have advanced very much because they do not want to remain confined by racial issues and religious extremism. That is what I hope can also be supported by all the people's representatives, so that we focus on the real problems of the people: the cost of living, a better quality of life, and most importantly, a bright future for our children, so that they are confident they will live better than their parents. That is all, thank you.

Speaker (Speaker)EN

Thank you, Air Putih. Okay, Pantai Jerejak, please go ahead.

Assalamualaikum WBT, Dato' Speaker, fellow Honourable Members. We are in this House perhaps less than 12 months from now. The Chief Minister has announced that his intention is that the State Government will continue the term, meaning that if it runs its full course, it ends on 16 July 2023, even if the Federal Government dissolves Parliament 12 months from now, which is the period we will go through. In the context of the Penang Government, we have been the government since 2008, which means we have entered the 14th year and the 15th year. Let me give a brief picture, at least a rough observation, of the performance over 15 years. The purpose is so that, in moving forward, there are certainly many lessons to be learned from those 15 years.

I think that in terms of the ability to attract investment and create employment opportunities, we have shown an impressive performance, although during that period there have been ups and downs. In terms of welfare, I think this is our own distinctive strength, not only in Penang but also in Selangor, the state where we became the government. Policies regarded as pro-people have been very prominent. The cash assistance we started benefits every segment of the population in this state: Persons with Disabilities, senior citizens, housewives and all the various groups we have already announced, and this has remained government policy up to today. We are able to do this certainly because of sound and efficient financial management. We make the best use of state revenue, and whatever surplus there is, we channel to the people. As for the performance of the two Local Authorities, in relative terms, in terms of the cleaning of drains, the performance of refuse collection, and in recent times, I have noticed that at several locations within the inner city of George Town, with permission, there are back-lane beautification initiatives underway. This will certainly bring improvement in terms of the beauty of the city and at the same time give significant meaning to the improvement of lifestyle (quality of life). At the same time, Dato' Speaker, while we can be proud of those achievements, there are also several aspects to which we need to give attention. First, in talking about Penang, we cannot escape at least three (3) matters. First, the development of hillslopes, the conservation of garden or park areas, and heritage buildings. I see and recommend that the State Government should adopt a cautious approach, (with permission)…cautious approach, to hillslope development for commercial purposes, for example. We know that developers are not charity organisations; they enter business for the purpose of profit. If what is being developed is housing, we must understand that the State Government's policy, the State Government's direction and the State Government's planning, while we are pro-business, the welfare of the people, especially the lower-income groups, cannot be compromised at all. The State Government must leverage its position, starting from this policy and principle, to inform or communicate to developers that when developing a project, especially in hillslope areas, while meeting the demands of the types of housing being developed, it must also be matched with the housing demand of the people in our state, and there must be no mix-match, if I may say so with permission. This means our policy, our development principles, and our development planning must be conveyed to these developers: that you may develop high-end housing projects, but the stance and policy of the State Government is that you must also take into account the interest of the poor. So this is the role of the State Government, because hillslope development usually comes with its consequences: environmental impacts and so on. So that is what I want to recommend, a cautious approach. We know that the demand for land is also very pressing on the island side, which is why reclamation projects exist. On this, I think the government must also show a caring, sympathetic and pro-people policy. Of course, the challenge for us is to achieve a balance between meeting development needs and demands, and at the same time, there are segments of our society, particularly fishermen, who are affected by environmental pollution, by the increasingly limited fish supply, and by inflationary pressures. The government policy that I intend for us to translate as a manifestation of our pro-people stance must take the form of aid schemes that are more tangible to this group. Targeted assistance: where they are, who they are, the relevant data, and the approach the State Government takes, if we show a more pro-people attitude without neglecting the interest of development needs, must also be given attention. That is the second matter.

The third matter is that not everything in managing the state and its people can be done by the State Government. That is why in our society there are groups we regard as civil society or NGOs, and they are vibrant, with permission, active. There are segments of society that the State Government does not focus on at all. For example, we are aware that in our society, death, fate, marriage and encounters are determined only by God. So for segments of society who have reached old age, if according to medical reports they have been identified as having illnesses and so on, they may have only a few months, and they become the responsibility of the family and the community. There are NGOs that fill that role there, hospice for example. In Singapore, the Singapore Government is clear about it. It says the Ministry of Health will not be involved in managing this segment, but if there are NGOs and civil society, the government will facilitate funding or logistical assistance. I think this is something the State Government should show now. Perhaps there is, we provide, maybe enough and maybe not enough. We do provide, but perhaps it is not yet enough, not inadequate, we would say. So they fill the gap by implementing this programme through volunteers, civil society volunteers, and because of their role, they relieve the government of its responsibility. I think we should not overlook which groups they are handling, those who are terminally ill, yes…(interruption). Leader of the Opposition….(interruption). Thank you, I feel honoured to receive the intervention of the Leader of the Opposition. Thank you.

Thank you, Honourable Dato' Yang di-Pertua. I am interested in what was raised and expressed by Pantai Jerejak regarding hillslope development and sea reclamation, and I am interested in the suggestion that the State Government should look at the interests of the people. The interests of the lower-income groups need to be considered when we develop housing projects, commercial centres, sea reclamation and so on. What I see, what I notice, is that there are projects being implemented that do not take into account matters such as the environment and so on. These matters are not put first, the interests of the people are not put first, and the views of the people are sometimes not considered either, objections and so on. The views of NGOs related to the environment are also not taken into account. So, would Honourable Pantai Jerejak agree if we asked the State Government to review these issues so that the strength of the Pakatan Harapan Government will continue to remain? I see that it is now declining somewhat because of these issues, because of people's issues, environmental issues and so on. So this matter needs to be looked at again. For example, the objections of the people need to be looked at in the matter of workers' dormitories and so on. We must have another alternative for looking at this, so that action is taken by the State Government to resolve the problem.

Speaker (Speaker)

Okey, jelas.

Thank you to my colleague from the Opposition. Therefore, Dato' Ketua Pembangkang, our role in this House is a role of checks and balances. The role of monitoring, yes, and the role of making policy and direction. Okay, that is our role. So, this is the best platform. Was any engagement effort made? The answer is yes. Yes, at the level of the State Government. At the party level, we ourselves, the President of Keadilan, held dialogues with those involved, listened, and conveyed matters through the proper channels. Okay. Did the State Government not take it into account at all? That is not accurate, yes. Through the feedback we received, that process continues to be carried out until the matter reaches its conclusion. There is very much room for us to continue conveying our views. We are not only talking about the issue of land reclamation in the State of Penang, yes. In Johor, Melaka, Kedah, in Langkawi, its value reached RM40 billion, signed with a former Prime Minister from Pagoh, involving a government and a company from Dubai, yes. That was according to the planning interests of each respective State Government. But in our context, Dato' Ketua Pembangkang, I myself, through continuous engagement and participation, conveyed it in a series of meetings with the Chief Minister. Even if not through media statements by our party leadership, we asked to meet, I sat down with him for two to three hours, and I met with TYT, His Excellency the Governor, where I took views and conveyed them directly.

The issue is that from one city, the demand for land is very high. If given the choice between an island or mainland, they would choose the island, okay. Then the State Government must ensure that our policy in managing this issue is pro-business, yes, and at the same time, another challenge is limiting the impact or effects of that policy, yes, because that point of balance is what tests our wisdom in making judgements. That is why I used the recommendation that a cautious approach and limiting negative impacts are needed, so that we achieve a win-win situation. That is the challenge for any government. Even the Dubai Government, which is very well known for its outstanding land reclamation projects in our country, faces the same effects. During my visit to Dubai last December, I made a visit and met the President and CEO of Nahel Group, yes, and Sheikh Rashid Lootah. He gave similar views on these challenges. There will be costs in letting go, but thank you, Dato' Ketua Pembangkang, for being interested in the idea I put forward. Earlier, Dato' Speaker, I mentioned that there are NGOs carrying out a role that the government does not do. For example, I cite Singapore, where it is clear: financial aid, please. Logistics, we provide ourselves through the ministry, they will not do it, but we know their existence, we know the NGOs, we know where they are and who runs them. They manage people who have reached the final stages of their lives, which affects their families and the community as well, and NGOs here have a role. And, what do you call it, I would like to take this opportunity to suggest that the State Government give some attention, especially in terms of funding and logistical assistance. I know this can be done, just as we launched the Mutiara Food Bank initiative in 2017, which today has grown and is being emulated by several parties. The State Government provided support in terms of logistics and funding. But when we started on 1 May 2017, we started from zero, until it had an impact, and then the State Government stepped forward to give support. I think the same approach can be applied.

Gooi Hsioa-LeungPKR · PHBukit TengahEN

Honourable Pantai Jerejak, may I interrupt you briefly? May I have the Honourable Member's view? I am interested in the issue raised by the Honourable Member regarding the role of NGOs in helping certain sectors. I would particularly like to ask for the Honourable Member's view on welfare issues.

Even now we can see that our country is heading towards becoming a nation where people are growing old. We are approaching an ageing population, but at the same time we see that the welfare services, or social services, provided are not balanced for us to be prepared to face that situation, our country, to care for this group. I will give one example. Although we provide financial assistance, and there are care institutions for senior citizens such as Rumah Seri Kenangan, and such as Rumah Ihsan built in other states by the Federal Government, they have not received the same attention. In Penang, we do not have a single Rumah Seri Kenangan run by the Social Welfare Department itself. Most of them are run by, actually I think there is not a single old folks home run by the government, and all of them are from the private sector or NGOs. So my question is whether the government, whether the Federal Government or the State Government, can do more, firstly to provide support and encouragement to the private sector or NGOs to further improve these services for senior citizens, and secondly, whether there should be a restructuring of our specific policies on caring for senior citizens. Because if I look, Dato' Seri, when we go to many places, in villages, we still have, we often visit, we see a lot of old people who are very poor and unable to look after themselves, and they do not have any support…(interruption).

Speaker (Speaker)EN

Okay, Bukit Tengah. We hear you clearly.

Gooi Hsioa-LeungPKR · PHBukit TengahEN

So I would like to get the views of the Honourable Member.

Thank you to my friend from Bukit Tengah. Dato' Speaker, we must accept the reality that not every matter in managing this nation and this state rests on the shoulders of the government. The government provides leadership, the government formulates policy, the government provides allocations, the government has agencies, but there are also aspects where the role of non-governmental organisations and civil society is more effective. So the role of the government is, where necessary, for Bukit Tengah to make a shift in terms of policy. My friend Air Putih and I had the opportunity, Dato' Speaker, for not long, about 22 months. What are the facts before us regarding our government's welfare policy? I mentioned yesterday that in the cost of living, one of the sources of income for our people is government cash assistance, subsidy assistance. Now, while we are sitting here, the figure for government subsidies to the people amounts to RM27 billion. A study was done on the impact of subsidy assistance on the people, and this impact was reported in the OACD Report for our country: the impact is zero. If the purpose of subsidy assistance is to lift the people out of poverty, the impact is zero. In the case just now, carried out by Professor Amjat Palastine and Professor Jomo, who were appointed by the Employees Provident Fund (KWSP) to conduct that study, the cause is leakage. In Klang Valley, of 10 who are eligible to receive BR1M assistance, only three (3) actually receive it. The remaining seven (7) are left out because they know there is a BR1M scheme but they do not know where to report or where to register. They know there is BR1M assistance, they know where to register, but they are busy doing three (3) jobs in one day. They search for goods at rubbish dumps, worn-out goods, they work at dishwashing stalls for wages, so they have no time and in the end they are left out. The worst is that people who are not eligible for BR1M are also on the list. This is why my friend and I carried out data analysis based on the JPJ register, the income tax register, and the welfare register; we took 17 agencies and screened the data, the BR1M recipient data. The Leader of the Opposition's 10 million that we gave, seven or eight years before Pakatan Harapan switched it into cost-of-living aid, 30% of that 10 million had BMWs, were living in luxury homes. Those who own luxury cars and are not eligible simply slipped into the list of recipients. So we eliminated, we removed all those matters. So the issue is leakage and missed targets. So I agree that Bukit Tengah is moving towards an ageing nation, an ageing population, which has an effect on healthcare costs, housing, food, and they are not of working age but instead depend on family members who work. If there are civil society and NGO segments that are able to fill this role, I recommend that the State Government provide support in whatever way possible.

The second NGO, which focuses on education. Dato' Speaker, it is the Bureau On Learning Difficulties. They target children who are slow learners, or in our language, lembap, or hyperactive. What is their approach? Their approach is to motivate these children through art, yes. Appreciating heritage, history, the environment, theatre, painting, photography, singing, dancing. Their approach is creative. So this group, the target group of school children with learning problems, can become part of society because of initiatives driven or led by NGOs like this. Likewise, I am of the view that the State Government should not make them a left-behind group. If we have been left behind until now, I ask that this be brought to the fore.

Dato' Speaker, I seek your permission briefly to raise a few issues in my constituency. Dato' Speaker, the Sewerage Service Bridge Project of the Ministry of Environment, carried out by contractor Widad Builder at a cost of RM171 million, is really distressing to the residents of Pantai Jerejak. There is traffic congestion. There is a threat to life because holes are not covered; some people died on 6 December. Then the project was postponed, postponed and postponed. I have raised this with the relevant minister at the Parliamentary level, and it still has not borne fruit. I earnestly ask, Dato', Chief Minister, to raise this matter in your capacity as the people's representative for the area, to meet and hear the complaints. I have reached my maximum, but we have our limits, because this has entered the territory of the ministry and also the contractor. So postponing again and again, when the need is so urgent. It is already almost 85 percent complete, and then left abandoned. This is very bad for the community or the people of Pantai Jerejak.

Dato' Yang di-Pertua, I wish to express my sincere thanks to the State Government because the Bayan Baru Flood Mitigation Project with four (4) pumps has begun operating. This RM20 million will today bring relief from the flood threat in our area. But at the same time, I also earnestly seek the State Government's support to expedite or support the approval of the Sungai Nibong Flood Mitigation Plan. This is under JPS Barat Daya, because if this can proceed, this is because only one pump is needed, as the cost is roughly less than the RTB Bayan Baru, due to complaints from the people in my constituency at Perumahan Pantai Jerejak, Jalan Aziz Ibrahim, but Batu Uban will certainly also benefit if this RTB is approved, yes. In the Sungai Dua area, I earnestly ask, through the speech in this House, that the State Government give priority to the approval of the Sungai Nibong RTB so that it can be expedited. That will bring relief in terms of the flood threat.

Dato' Yang di-Pertua, I express my many thanks to the State Government for selecting the five point block in Mahsuri in our area as a pilot project for Redevelopment. For now, the flats are only 350 to 550 square feet in size. If we look at quality of life, it is indeed not conducive, yes, with the lighting conditions, the congestion, and this affects the upbringing of children in the family, which is why they sometimes choose to be outside the home for periods when they should not be outside. Once the State Government started these negotiations, they have reached the end, whatever the end is, that the discussions with the owners of the homes, half of the owners of these homes are not... (not living there) they rent them out. But in any case, the Housing Board has done an excellent job. They have managed to reach some consensus on the size of the homes to be built, 850 square feet, and that is a relief, but there are still how many further demands. They were given the opportunity to choose which floor they want to live on so that the maintenance fee is at a more reasonable rate. They demand that a green lounge area be provided. I think that can come later, but the first step is that if this succeeds, we implement a kick-off, and that will give greater confidence. In my area, Mayang Sari, Jalan Tengah and Block 55, they will see, as the English say, "seeing is believing". We have been saying for six or seven years, and it turns out that this redevelopment project is indeed happening. So I earnestly ask that it be expedited. Dato' Yang di-Pertua, I wish to make my final point and then conclude. Penang has been made a hub for Firefly for the aviation sector: Penang–Kota Kinabalu, Penang–Kuching, Penang–Johor Bahru, starting 1 May this year. Firefly is no longer a small aircraft; now it has a white body and its hub is Penang, okay, and it has only just entered its first month. I am of the view that this is the best opportunity, a great opportunity for the State Government to promote the tourism sector and trickle-down benefits to various other factors, especially for the people of the states of Sabah, Johor and Sarawak. I believe we can make use of this. I mentioned earlier, Dato' Speaker, during my visit to Dubai Expo in December last year and meeting several leaders of Dubai government-linked companies (GLCs), they were very unaware, they could hardly hear about the prospects of domestic tourism from our country. They know Vietnam, they know the Philippines, they know Indonesia, and even Dubai has become a hub for the marketing of tropical fruits for the Middle East sector; it has become a hub for tropical fruits. I asked, where do you get the fruit? From Indonesia, from Thailand, from Vietnam. We have rambutan, dokong fruit, and all kinds of fruit, but out of season, they have no information. So I would like to suggest to the Chief Minister that, if possible, an official visit be arranged with the Government of Dubai through, we can certainly establish direct relations with them through existing networks, because I see that prospect as very great when I tell them about the prospects of the domestic tourism industry; they are interested, very interested. I was surprised that they have become a hub for tropical fruits. That means they take tropical fruit from these Asian countries, and upon arrival in Dubai, they market it or distribute it to the states in the Arab bloc, while we, when the fruit season comes and there is an abundance, dokong has no price; go and pick it from the tree, that is how it is. So I believe the potential is very broad. Therefore, with my very modest view that I have conveyed today regarding the 12 months leading up to the general election, when we will entrust our fate to the people, 15 years of our performance in various aspects, the matters we should focus on involve hill slope development, land reclamation, welfare aspects, and then attention to NGOs that play a role in assisting the government but who need our attention and support. Then I have raised several issues in my area. That completes my speech, Dato' Yang di-Pertua. I thank you, and I support the motion of thanks to the Yang di-Pertua Negeri (TYT). Thank you.

Speaker (Speaker)EN

Thank you, Pantai Jerejak. Honourable Penaga, please.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Assalamualaikum Warahmatullahi Wabarakatuh and good day. (Prayer recital). Thank you to Dato' Speaker, the Most Honourable Chief Minister, all members of the State Executive Council (EXCO), fellow Honourable Members, Heads and also Directors-General of Departments and Agencies, and to the gentlemen and ladies, dear all. Let my opening greeting be received, let my greeting be returned, let this good motion be received, the ADUN for Penaga seeks to debate. Thank you to Dato' Speaker for giving me the opportunity to also debate the address of His Excellency Tun Ahmad Fuzi bin Abdul Razak, Yang di-Pertua Negeri, on the opening of the First Meeting of the Fifth Session of the 14th Penang State Legislative Assembly on 27 May 2022.

Mr Speaker, today we were shocked by yet another incident of suicide, a jump from the Penang Bridge at around 5.30 a.m. this morning, so today the mood is less than pleasant, because this matter is very worrying for all of us. A man of Indian descent, aged just 22 years old, was reportedly, and now the Fire and Rescue Department (Bomba) is searching and rescuing a drowning victim, and this needs the attention of all of us, because we see that the statistics of suicide cases on this bridge increase every year since 2019: eight (8) cases; in 2020, due to the pandemic, it fell to six (6) cases, but in 2021 it rose to 12 cases, and this year from January until May there were 15 cases, and today, 1 June, with one (1) more case, the total is 16 cases for this time. Incidents caused by mental health disorders or problems are increasingly worrying in our country. This illness has the potential to become the second biggest disease among Malaysians after heart disease. This month of June, one incident occurred this morning, and last month there were eight (8) cases of bridge jumping, of which four (4) of the eight (8) were rescued and four (4) died or were killed. So we do not want the Penang Bridge, as a landmark of our state, to become notorious or be mentioned as a place with potential, or a place that attracts people to kill themselves. From the Maritime Enforcement Agency, we see that cases of self-harm or suicide by jumping from this bridge increase every year, as I have mentioned, and the causes of these cases, in my view, are firstly health problems, secondly family problems and thirdly financial problems, especially since this time our country is also burdened by the cost of living, as has been debated by Honourable Members.

The World Health Organization (WHO) has warned that by 2030 depression will become the number one (1) global health burden. In Islam, the preservation of the intellect (Hifz al-'Aql) is among the objectives of the enactment of Islam, namely the Maqasid Shariah; Islam requires that every illness be treated and cured according to the best methods that do not contradict the syariah. Therefore, seeking help from professionals and experts is a religious obligation based on the word of Allah Subhanahu Wa Ta'ala in Surah An-Nahl which means "And We did not send before you any but men to whom We revealed; so ask the people of the reminder if you do not know". Therefore, cases like these need to be referred to professionals or people with knowledge so that they can be resolved. Apart from that, the government can also take action to contain this illness in society through the following measures: firstly, the creation of a harmonious work environment; secondly, building a robust social support system; thirdly, strengthening family institutions. These initiatives are important to realise the mission of Penang2030, a Smart and Green Family-Centred State.

Dato' Speaker, last Monday, 30 May, on behalf of the Opposition we received three (3) memoranda from the community or from residents, from three (3) different parties. Firstly, a memorandum received from the action committee opposing the proposed construction of a foreign workers' hostel in Bertam; secondly, a memorandum received by the Opposition from the residents' association in Shaik Madar; and thirdly, a memorandum from the residents of Kampung Paya Teluk Kumbar. The first memorandum we received concerns the issue of the construction of a foreign workers' hostel to be built in Bertam, which we see many parties have already debated during this sitting, so today I do not intend to elaborate on the objections of the residents in Bertam, which I understand were heard in the State Legislative Assembly (DUN) of Pinang Tunggal, which is also located in Teluk Kumbar under the DUN of Bayan Lepas, and the hostel was not built for the sake of the harmony of residents. In the written reply I received, I found that the influx of foreign workers also added to the shops they operate illegally. In 2020 alone the Seberang Perai City Council (MBSP) raided 51 shops, while in 2021 this increased to 99 illegal shops, which we see these foreign workers also run businesses, and this places or results in pressure and burden on local traders. We can imagine that if more are brought in, then even more shops will have to be raided. This has not yet taken into account the social problems in the areas concerned and also crime issues, where crime areas are increasing, crime cases are increasing due to the influx of foreign workers. Referring to my friend, the ADUN for Bertam, as a lawyer, indeed in our court cases we see there are criminal cases involving foreign workers. That is why we need to pay attention, and second, the views on redevelopment in the area, or on Jalan Shaik Madar. This issue, as was raised by a fellow member, the Honourable Member for Permatang Berangan, yesterday, in addition to the written reply I received, the compensation will be handed over entirely to the developer to be settled. I hope the State Government does not simply let these discussions go, considering that residents have no other place to live if they are ordered to leave, and they have been renting there for a long time. I also hope that the planning carried out can quickly resolve the flood problem in their area, considering this problem is within a first priority development area. This compensation needs to be clarified, because in the reply given when I raised the question of the development plan for Kampung Shaik Madar, the amount of compensation was not clearly stated and has not been finalised, and was simply handed over to the developer. That is why the State Government needs to intervene, and at the very least the compensation should provide comfort to the residents of Kampung Shaik Madar, or else they will have to look for new homes for their lives henceforth.

Dato' Speaker, likewise with the third memorandum we received, the third objection, which comes from residents of Kampung Paya, Teluk Kumbar. This village has also existed for a long time, said to be more than 100 years old, and there are 70 houses here. Their problem is that when this area is to be developed, they only receive inadequate compensation, namely RM48,000 only from the developer, whereas the price of the low-cost house built by the State Government is RM72,000. For those who are mostly fishermen, of course they cannot afford to take bank loans. From the written reply I received, the government also handed this discussion over to the developer and the government only monitors. From what I understand of this memorandum, this action will not solve the problem that has arisen, and therefore I see that serious intervention by the State Government is necessary to resolve the problems of the residents of Kampung Paya Teluk Kumbar. Dato' Speaker…(interruption).

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

May I interject. Thank you to the ADUN for Penaga. Dato' Speaker, when the issue of Kampung Paya was raised, that supposedly there was no action from the State Government, in fact, before I became a people's representative, as the DUN Coordinating Officer, I had already taken over this issue to defend the residents in the area concerned, for the information of the Honourable Member for Penaga: 67 houses are involved in the acquisition or for development, because their land is owned by Airmas Group to develop the Rumah Mampu Milik (affordable housing) project. And for your information too, I have helped settle 39 houses or 39 families to obtain replacement houses or to help them obtain houses either in the DUN of Bayan Lepas or, most recently, K-PARK. 39, of whom 24 others have already signed the agreement to accept compensation of RM48,000.00. Only four (4) did not sign, who did not respond, did not meet the Honourable Member, did not even meet the developer. So if it is said that I and the State Government did not help, then that is not true. I, together with the Housing Division and the Housing Board, always welcome them if they need our help. However, when we settle this issue, there are many complications. Some want two (2) houses, some say there are 11 people in their house. How can we help? And at the same time, when it reaches this stage, we have helped them obtain a house of RM42,000.00, and some obtained RM72,000.00. After these 39 houses were settled, these 24 houses were left hanging. So when it comes to renegotiating, it is rather difficult. In Teluk Kumbar there are only RM72,000.00 houses, but what the developer gave is only RM48,000.00. Thank you.

Speaker (Speaker)

Okey.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you to the Honourable Member for Bayan Lepas for the explanation given regarding the issue I raised, Kampung Paya, Teluk Kumbar. As I said, I did not say that the State Government washed its hands of it or did not pay attention to it, by the Honourable Member. And I am confident the Honourable Member, as the ADUN of the area concerned, is also involved in resolving the problems of the residents of Kampung Paya Teluk Kumbar. But as I said, in the memorandum received, this memorandum was indeed received and emphasised that the compensation to be given must be adequate, because if they are moved out and want to buy the Low-Cost Houses built by the State Government there, the price is RM72,000.00, whereas the compensation they receive is RM48,000.00. That is what I ask, that the government also addresses this, and if this succeeds, perhaps it can enhance the image of the state, and the Honourable Member may also perhaps remain for one more term in the area concerned.

Terima kasih.

Speaker (Speaker)EN

Is it the same question?

I just want to record in Hansard regarding the Bertam Objection Action Committee and also Jalan Sheikh Madar. So that the State Government takes into account the views and also the objections of residents regarding these objections, whether engagement is carried out to discuss the issues in Bertam, and the views of residents are taken into account on the type of industry to be operated so that issues of pollution and so on that may arise can be avoided. Social impact and so on. Likewise, regarding the construction of the hostel, it also needs to consider the views of objection from the NGOs and residents of that area…(interruption).

Speaker (Speaker)EN

Okay, Sungai Dua.

Secondly, Syeikh Madar also needs to be engaged with, so as to resolve the problem.

Speaker (Speaker)EN

We will hear from the EXCO later. Please,

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, Honourable Member for Sungai Dua, for the interjection and also the views given, which may be included in my speech too. Dato' Speaker, the history of Islam in Penang, in the address of His Excellency, I was interested in the Al-Hadis Center (AHC) Project which was officiated by His Excellency, which is the Penang State Centre for the Study of Islamic Thought and Civilisation. Its main function is to focus on research and development (R&D) of the Ummah in Penang. Dato' Speaker, it has long been said that Penang was opened by Francis Light in 1786. However, the Batu Uban Mosque was built in 1734. How can it be said that people who came from outside were the founders of the state when there were already residents living in this state before 1786? I hope that with the existence of this Al-Hadis Center, the Islamic history of Penang can be seriously uncovered and the true history of this state can be clarified so that future generations do not receive wrong information about the history of the State of Penang that we love. In addition, I also hope the Al-Hadis Centre can help turn the traditional villages in Penang into Heritage Villages before they are swallowed up by the rapid development that is growing today. An example I can give, which I can give, is Kampung Batu Uban. From the written reply I received, this village has been proposed to be gazetted as a Heritage Village under the Penang State Heritage Enactment 2011. However, in the same reply I received, it was said that there is still consideration to gazette it because they do not wish to deny the right of village residents to develop their own land. I hope the AHC can study this matter and it can be resolved at this time. It is a pity that areas with a mosque that existed before the arrival of colonists are not made into Heritage Villages.

Dato' Speaker, I would like to move on to local issues in my DUN, namely the DUN of Penaga. The first I want to raise here concerns the traffic congestion on Jalan Pekan Penaga. Especially the congestion we can see on Thursdays and also Sundays when there is the Pekan Hari (market day). And this congestion can also be seen on ordinary days or during holiday seasons or weekends when many visitors from outside, tourists from outside who visit or go to a tourist area that is quite well known in Penaga today, namely the area of Kampung Ah Gong. Kampung Ah Gong. Not Kampung Agung. But its original name is Kampung Ah Gong. In Bakar Kapur. This causes a noticeable traffic jam. This complaint has been raised by the local community, local residents, to my service centre, and I ask the Local Authority (PBT) to study and look at the mechanism and method of how to resolve it, so that we ensure there is no significant congestion in Pekan Penaga, especially as I mentioned just now on Thursdays and also on Sundays caused by the Pekan Hari there, and also on public holiday days when many visitors from outside enter Penaga…(interruption).

Lee Chun KitDAP · PHPulau TikusEN

Thank you, Honourable Member for Penaga. I was very interested in what has been raised regarding the traffic problem in the Penaga area. I would also like to ask, when the Penang State Government issued the Transport Master Plan for Penang but was opposed by your party too. Therefore I am very confused, what is the solution from you to resolve all these traffic problems, if the State Government's plans are opposed by your party?

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, Honourable Member for Pulau Tikus. As I said, I recall in this House, Dato' Leader of the Opposition and Dato' Speaker, we did not oppose and we do not oppose projects developed by the State Government, including PTMP (Penang Transport Master Plan). What we fight is PSR. Because it has nothing to do with the Penang Transport Master Plan…(interruption).

Lee Chun KitDAP · PHPulau TikusEN

PSR is linked to PTMP too. Don't have one without the other. Because the Federal Government has already cancelled our loan.

Speaker (Speaker)EN

Penaga, there is not much time for you to debate.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, Mr Speaker. This is not just any rat. The rat comes from Pulau. A question from the Honourable Member. Pulau Tikus, I cannot focus because he stood up to disrupt.

So I return to what was raised earlier regarding traffic congestion in Pekan Penaga, which should also be given attention, and the problem of the Hari Pekan or Pasar market on Thursdays and Sundays, which is maintained under MPKK there. If MPKK is seen not to be functioning or not playing its role, based on the reply given by the responsible EXCO when I asked my oral question, I found that there is a condition set that the party responsible, or the one managing this MPSP from MPKK, must ensure that the traffic situation is controlled and orderly. But I see that they only collect money at the market sites or market stalls today and do not manage the traffic situation. So I see that from the management side, it needs to be improved or, if possible, taken over by the Penaga Kariah Committee (Jawatankuasa Kariah Penaga) itself, which would be better at managing and ensuring that Pekan Penaga does not experience congestion.

Second, I also want to touch on a local issue in Penaga, namely the issue of drugs and also the issue of ketum drinks. Thank you to the EXCO concerned from Penanti, who has also given attention, because in Penaga there is one mukim. There is Mukim 1, involving three villages, if I am not mistaken: Kampung Bakau Tua, Kampung Pulau Mertajam and also Kampung Kuala Muda. And this is said to be Mukim 1, a drug hotspot area, and I thank the AADK (National Anti-Drugs Agency). Congratulations to those who have toiled hard, from the national level, the State AADK, and also those who came down, including at the SPU level, trying to ensure that cases or drugs can be reduced, and that these hotspot areas can become green areas, because we want to ensure, InsyaAllah, that what has been set in the AADK mission, which is Controlled Drugs 2025 (Dadah Terkawal 2025). We are worried because it is not only today's addicts, but they produce new addicts. It starts with the problem of our teenagers at the secondary school level and even at the primary school level. Our children, our younger siblings. At the primary school level, they have already started smoking. Then after that, at the teenage level, they have started drinking ketum drinks. There are ketum drink ports in Penaga, and from there they move on to taking drugs. And this is very worrying, and we want to ensure that the mission we will achieve must be given attention and emphasis by the parties involved, especially the responsible EXCO. Perhaps the Honourable Member can touch on it in the winding-up. And I have proposed several times that in the coastal area of Kuala Muda, where there is forest and mangrove, the places where these drug addicts go to inject and so on, that area should be cleared and, if possible, be made a recreation place for the public, for sports, jogging and so on, so that when the area is visited by many residents or the public, who begin to visit the area as a recreation centre, it will to some extent eliminate these drug addicts' ports. And I am also worried, because in my question I asked about this drug issue, because I am afraid that the cause of these drugs leads to the spread of what is called AIDS or HIV. But in the reply given by the Honourable Member, the EXCO from Penanti, replying on behalf of the Right Honourable Chief Minister, I saw the statistics given. HIV is not, today, no longer a problem, or is it? The cause of HIV is no longer the sharing of syringes used by drug addicts. Then it was mentioned here, at the level of the State of Pulau Pinang alone, the statistics given were that the sharing of syringes resulted in only 10 cases in the State of Pulau Pinang, from needle sharing, which led to contracting AIDS or HIV. But what worries me, and this also needs attention in this reply, was mentioned in detail or clearly, is that it must be given attention by everyone, including by the State Government, and we are also responsible for ensuring that our society, a good society and a good life, does not experience social breakdown, problems of deviant activities and the like. What I am afraid of is that when it was clearly stated there that the reason many or large numbers become infected with HIV is due to deviant or unnatural relationships (LGBT), homosexuality and the like. With the cases last year, in 2021, there were 164 cases involving LGBT. And also other cases. So this is very worrying for us. We are afraid that one day, when our country develops, as was mentioned earlier, a state that is developed, equal to the international level, these cases may destroy our society. That is why we must educate and ensure that our Muslim society lives in harmony with religious values. All religions aim toward goodness, and these values must be instilled so that they do not turn away or follow deviant conditions, unnatural relationships and the like. This too must be given attention by all of us… (Interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Just a brief clarification from the Honourable Member for Penaga. Thank you to the Honourable Member for Penaga. Thank you to the Honourable Member for Penaga, who is so concerned, especially about issues closely related to drug abuse. Earlier, what was raised by the Honourable Member for Penaga, especially in his constituency. Earlier the Honourable Member also mentioned the use of ketum drinks. I think this is a very important issue. Yesterday the Honourable Member for Bagan Dalam also raised this issue, but there are rumours that certain parties are calling for the legalisation of planting ketum. So I would like to ask the Honourable Member for Penaga for his view on this issue.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, my friend from Pengkalan Kota. There are rumours, just proposed, we will see later. Regardless, for me, something that clearly can destroy the human mind, as stressed in Islam, we are indeed against it. That is why we have placed, among others, drugs as prohibited, and also anything connected to drugs, and ketum is the same, when it can destroy the mind. This is what I worry about, because these are our young generation, the future of our state. If the condition of our youths and teenagers becomes entangled in drug use and also these ketum drinks, our country will indeed be ruined, because we want future generations to be better than us, and that they can manage the development we leave behind. Mr Speaker, among the problems… (Interruption).

Speaker (Speaker)EN

Until you conclude, there is far more.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Yes. Thank you, Mr Speaker. The opposition has left me alone.

Speaker (Speaker)EN

Are there more, are there many more?

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Mr Speaker, within the Penaga matters I also want to stress once again, although I think it has been four years since I first raised it in the first sitting of this term in 2018, that is the local community's demand for ATM machines so they can withdraw money more, and more quickly, because right now in Penaga there is only one ATM machine, placed at Shell, the Shell petrol station in Pekan Penaga. There are other petrol stations, and there are areas that we see have potential for opening ATM kiosks, because the people of Penaga have a lot of money… (Interruption).

Speaker (Speaker)EN

There are no petrol stations?

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

There are petrol stations. Two (2) locations in Pekan Penaga, and there is an ATM placed there, an ATM machine, and there is one more near Kampung Bakar Kapor, but there are still no banks that are interested. So I hope this matter will be given attention, especially by the banks, because there is a demand. I confirm that the machines they place will be used to the maximum… (Interruption).

Phee Boon PohDAP · PHSungai PuyuEN

At present we encourage the use of e-wallets. This is faster, safer, and manageable from anywhere. If we place cash machines, that too is a security question.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Alright, thank you, Sungai Puyu, a good view which we can consider. InsyaAllah. Mr Speaker, there are many issues I want to raise, but there is also a request regarding the water problem, which some of our Honourable Members have raised in the State of Pulau Pinang, which occurred especially in Seberang Perai Selatan, although earlier what was mentioned by Air Putih, meaning Penang is great, and we still hold the record that this water has never been rationed and may never be rationed. But when the water issue that is hotly discussed today, especially in Seberang Perai Selatan and more specifically in Taman Seri Emas and Taman Widuri in the State Legislative Assembly (DUN) of Sungai Bakap, I think what needs to be given attention has dragged on for four (4) years. PBA must look at it, it has dragged on for four years, and only recently has it become critical, after or when Muslims were celebrating Hari Raya Aidilfitri. Sometimes there is no water from morning until night, until late at night. So I was asked to raise this in this House because our Honourable Member cannot speak, being the Deputy Speaker. I am raising it so that we give attention to solving the water problem, especially in Taman Sungai Emas and also Taman Widuri, so that it is resolved as quickly as possible. Likewise, Mr Speaker, I also want to touch on the Pakatan Harapan Manifesto, which was mentioned and raised by my friend from Seberang Jaya. Although earlier many also touched on achievements or accomplishments, as my friend from Seberang Jaya mentioned, and today in this debate session, I want to stress how I want to say that what was said, that 90 percent of the manifesto has been implemented, is still not yet reached. The Opposition can put it at only 60 percent completed. You may refer to it, I will not prolong it, you can see in the PH manifesto drafted in 2018… (Interruption).

Zulkifli bin IbrahimPKR · PHSungai Acheh

Mencelah sedikit.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Drafted in 2018… (Interruption).

Speaker (Speaker)

YB Penaga.

Zulkifli bin IbrahimPKR · PHSungai AchehEN

I am interested, actually, I want to join the debate, but what was touched on by Penaga earlier. The implementation of the manifesto that has just been implemented is different. So I want to raise whether Penaga agrees or not that it has not achieved 90 percent, because he included it together with what is to be implemented. "To be implemented" is different from "is being implemented". When one has just taken office, one has only just begun to do it, and it has not yet been done. So, the 90 percent should not yet be raised. That is what I think. Do you agree or not, Honourable Member for Penaga?

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

I totally agree, because it has not yet been implemented, so we cannot measure its achievement, as it has only just been implemented. So I will not go on at length, because I am mindful of time. However, you can look again at the manifesto, at manifesto number 16, and there we can see how two of the manifesto items that were mentioned have still not been implemented up to today, in 2022.

Mr Speaker, because time does not permit me, I am taking this opportunity in today's debate, and I support it. Thank you.

Speaker (Speaker)EN

Thank you, Penaga. Yes, Sungai Aceh.

Zulkifli bin IbrahimPKR · PHSungai AchehEN

Thank you, the Honourable Dato' Speaker. Assalamualaikum Warahmatullahi Wabarakatuh and greetings to everyone. To the Honourable Chief Minister, fellow State Assemblymen, members of the media, government officers and staff, and all who are following this sitting of the House. We are able to be together again in this session and

there are a few matters I wish to touch on. I want to make my points because we do not have much time, so I will try to be brief. First of all, I thank the EXCO members who answered, especially the written questions that I raised earlier. This time I am focusing more on written questions because I had also included them in my speech in the previous session. Alhamdulillah, some have been resolved and some are still being acted on and are in process. This time, I ask that these matters be given attention, especially the issues related to them. I feel the most heated issue right now is the water supply. Earlier, Penaga mentioned the SPS area, this is the Seri Emas area, but it actually extends as far as Sungai Acheh. In recent days, there has been no water for several hours in the Sungai Acheh area. Users should also have been informed in advance, but it reached a point where, when things were already chaotic, a notice was finally issued on Facebook and was made viral on the PBA Facebook page. I see that a mechanism needs to be put in place, especially for this water issue. In the Sungai Acheh area, Honourable Dato' Speaker, the existing piping system, especially in the interior areas involving the road and road shoulders, from 4-inch pipes goes 400 to 500 metres inside. As development in the Pekan Nibong Tebal area has grown rapidly, perhaps reaching what is it called, several other areas, the pressure that reaches the border areas, in the Batu Tiga area, Paip Rasa up to the Che Naam area, the acceptance of water supply there is really very slow indeed. So I hope for a more comprehensive mechanism in the SPS area. I also hope that the State Government, apart from clean water, will look at water that needs to be treated from the Sungai Perai, which is being done by PBA, perhaps through a joint venture or by using water from the Perak State area. I also know that this effort may only be more serious this time. I think the application may have been made in 2010, but perhaps the State Government, with this issue of global warming and the water that needs treatment, we are facing a problem. This mechanism needs to be accelerated, and we also know that perhaps Perak has reasons in the discussions or agreements that we need to obtain from them. So we hope that the State Government is serious with the Perak State Government in taking this initiative so that the supply of clean water can be resolved across the whole of Penang State.

Honourable Dato' Speaker, I also want to raise the issue in the Sungai Acheh area relating to roads involving JKR and the MBSP, but in the JKR area I particularly thank Puan Siti from JKR SPS, who helped with the main federal road…(with permission). For a long time, every year, when the tide is high, the water crosses the road at what is it called, it crosses that road at the Datuk Keramat area in SPS, and there is no drainage system at Datuk Keramat. Right now, only a few roads are under construction, but what we see is that Kampung Ruyung needs to be improved. I feel that complaints have been made many times at Kampung Ruyung, and until now there has been no action at all, only the area at Simpang Tiga was repaired, and that area is still in good condition. So I hope this matter is taken into account for the convenience of the local residents. The same goes for areas involving excavation on JKR roads, especially when drainage or pipe repairs are carried out by PBA. We see that when contractors or PBA dig, and when they resurface, the road becomes badly potholed again. Recently there was even an accident involving several places in the Sungai Acheh area near Caltex. Some motorcyclists had their legs broken. I also hope that contractors other than JKR can ensure that every project carried out by JKR in this village area must be maintained or repaired properly, because this is for the safety of road users.

Dato' Yang Di-Pertua, my written question concerns the widening of Jalan Kampung Kuyong up to the Simpang Tiga of Sungai Acheh town. I have also raised this earlier in an oral question and in my debate. However, I am puzzled, because we asked for the road to be widened from the Simpang Tiga to Sungai Acheh town, but what happened is that a tender was issued to remove the old grass and plant new grass. That is what I feel should not have happened. Removing the old grass and planting new grass; the allocation should have specified widening by phases. I mean, in stages. I understand if we do it bit by bit according to need, but when people complain, it is not the YB who first asked for the road to be widened. What is this, going to remove the old grass and plant new grass? So, in my view, this is a waste, because if next year the application for widening the road is approved, would it not be a waste that we widen it again in that area? So I hope these things do not happen, and I also hope that this widening can be expedited, even though the development allocation application for 2022 that was answered by the Honourable Tanjong Bunga has been informed that it was rejected and a fresh application will be made for 2023. I also hope that application can be approved for the sake of the road users in the Sungai Acheh area. One more thing, Mr Speaker, I also received a written reply from the Honourable Tanjung Bunga concerning the flooding in the Sungai Che Naam area. I have raised the flood issue before. I thank you for, what is it called, the drainage issue that has been a problem in the Sungai Chenaam area. However, for the information of the Honourable Tanjung Bunga, this area is located near the sea. There are pump gates and floodgates there. When the reservoir water or the rainwater that falls is heavy, a lot of it there, that is why as many as 50 houses are involved in this flood case, when it coincides with high sea tides. When the sea water is high, the doors of the pump houses and water houses cannot be opened. If they are opened, sea water will definitely enter. That is another problem. That is why I ask that pumps be installed at the existing floodgate area so that the water inside the village can be pumped out to the sea. At the same time, I will also ask that at the last meeting we find out whose drain it is, because everyone has been passing the buck before. So I have asked the agency to upgrade the existing drains in the PPRT area. Not only that, it is pitiful. Sometimes when the tide is high, I go down to help bail out the water, but it is not resolved. Their refrigerators are spoilt, their TV cabinets are spoilt. This is a problem that I feel needs to be addressed, why a pump house needs to be set up there. So I hope that, as I have been informed, the RM12 million for the pump house can be implemented, because for me, although it is said to be a large amount, for the comfort of the PPRT residents, who number about 300 units or more, because now if you look at the flooding in the Chenaam area, it is no longer just the PPRT area, it has spread to the old Chenaam area. So I hope that the State Government or JPS can consider setting up a pump in the Sungai Chenaam area.

Dato' Yang Di-Pertua, the issue in the Sungai Acheh area that I need to take into account in this area is street lighting. Many times I have wanted to make complaints to MBSP. As for these street lights, I do not even know what system MBSP uses. When I inform the contractor, the contractor says they must wait for MBSP's instructions. When waiting for MBSP's instructions, sometimes it takes time. From the Bukit Tambun area to Tasik Mutiara, from USM in the Sungai Acheh area to Trans Kerian, it is very often not working, many times already. I have lodged complaints with MBSP, I have lodged complaints with the contractor, but it still has not been resolved, and the area is in darkness. Moreover, if there are potholed roads, the motorcycle gangs become troubled, endangering them. So that is why, this issue, I did not want to speak about it in the DUN, but I have to speak because it has not been resolved up to today. So I hope this matter is taken seriously by MBSP in relation to street lighting in the Sungai Acheh area and in SPS itself.

Dato' Yang di-Pertua. I feel it is incomplete every time I debate, I raise the issues of wild boar and monkeys in my area. Even in writing, it has been answered by the Honourable EXCO. Dogs too, this is one of the matters of concern in my area, there are far too many, to the extent that they have become a burden to the local residents. Not only chicken-eating dogs, recently in the Sungai Chenaam area, one entered a goat pen and bit a goat. There have been cases of death in reports that have been lodged. So, when animals in human settlement areas cause danger, I ask that the parties involved, and I thank Perhilitan, yesterday we had a meeting to carry out a process to shoot wild boar on a large scale in the Sungai Acheh area. After this, they will go to Kepala Batas, because they have endangered lives, they have put human lives at risk. There was an accident recently again, hitting a wild boar. Sometimes, when you want to tell someone, it is an accident about what? Hitting a wild boar. An accident about what? Hitting a wild boar. So I hope the authorities responsible, especially those managing wildlife, can help, especially me, because I have made this new application to shoot wild boar on a large scale, but because the application from my office cannot go to PDRM, it needs the Department of Wildlife and National Parks (Perhilitan), and that is why I ask Perhilitan to make a formal application so that implementation at the ground level can be carried out on a large scale to curb the breeding of these wildlife animals that cause danger in residential areas. Please proceed.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, Sungai Acheh, for giving me a little room to interject. So, the issue raised is about the wild boar problem. I do not know, perhaps these animals breed quickly. The more there are, the more there are. Not only on the SPS side but on the SPU side, especially in Penaga. I think there are many in Permatang Berangan too. Recently, YB, there was a case at Permatang Bendahari, at night. I was contacted and I went there. How bold these boars are. Now it is not people hitting boars, or motorcycles hitting boars, it is boars hitting motorcycles. They came out in large numbers, rushing about with all their young, hit a motorcycle, and the injuries were quite serious, and the person was taken to hospital. So I hope this case is given attention so that residents and the community can live in safety. Right now they are not only eating the rubbish that is thrown out, but they have even reached the level, as mentioned earlier, of goats. In Penaga, chickens, they will go in and eat them. So I ask for an explanation.

Zulkifli bin IbrahimPKR · PHSungai AchehEN

Thank you, Dato' Speaker. I agree with the view of the YB. Penaga, because this matter has put us in danger, Honourable Dato' Speaker, because when we live alongside these dangerous creatures, like boars, it is not that we hit them and suffer badly, they hit us and we suffer badly too. So when they hit us, we suffer badly as well, so we need to take this matter seriously. I earnestly hope, and especially in the Sungai Acheh area, that this is a rice granary area, and they are destroying rice crops and also the crops planted by farmers. Whether it is behind people's houses or wherever they plant, they have already begun to disturb houses. Moreover, in the Sungai Acheh area, for the information of the Honourable Dato', at 1.30 in the afternoon they were already at Taman Pekaka. They came out, and there were already what looked like stray dogs, so that when people wanted to go to their motorcycles, they became frightened. They entered the housing estate, they have started to enter the housing estate. Not only at night now, but also during the day. And I hope this matter is taken seriously, especially in many places in the areas mentioned earlier by Penaga, Permatang Berangan, Penaga itself, and perhaps I think Sungai Dua is also involved, they have begun to enter residential areas. So once they enter residential areas, I feel urgent action needs to be taken, serious action, so that this matter can be handled and no longer endangers people. We also understand, we have entered their areas, but we cannot, should we reject development simply because "oh! they must remain in the forest"? But we cannot develop the areas that we need to feel…(interruption).

Cuma…(gangguan).

Speaker (Speaker)EN

Please summarise this issue, I have heard a lot.

The wild boar issue has been talked about for a long time. Every area already has it, because we carry out development, and wild boars enter village areas and housing estate areas. So is there any method other than shooting, trapping and so on? It does not solve the problem. One method is to commercialise wild boars. Because there is a company that discussed it with me, they are willing to come down to buy, to catch, and they want to sell it. I think a method like that could reduce this population. If it is only shooting, shooting also has conditions. There must be safety, there must be a police report to carry out an operation, and there must be an NGO that is willing to shoot and willing to take back these wild boars. This will not solve the problem if it is just this. I think we need to sit down for one day to hold a serious engagement discussion about this, because it is already disrupting agriculture. Recently, in his paddy field, he went and cut the rice plants, he made his nest, he made his place. All the paddy yield is gone. There are many other things that I feel could cause problems…(interruption).

Speaker (Speaker)EN

Okay, we will later hear the answer from Perhilitan.

A specific discussion, one that is as serious as we are discussing the issue of foreign workers' dormitories, here too it must be taken seriously, it has also become a foreign and destructive matter.

Nor Hafizah binti OthmanUMNO · BNPermatang Berangan

Mohon mencelah.

Speaker (Speaker)

Juga?

Nor Hafizah binti OthmanUMNO · BNPermatang BeranganEN

Just a brief addition. If we look at the Seberang Perai Utara area, in Tasek Gelugor alone and the surrounding areas, there is already development for housing construction, 14 projects. So I am confident that the forest and scrubland areas that have become the habitat of wild boars will be cleared, and the herds of wild boars will not have a habitat, so they are forced to roam around the housing estates to look for new places. So perhaps we can discuss specific proposals for methods to solve this problem. Thank you.

Zulkifli bin IbrahimPKR · PHSungai AchehEN

Thank you, Sungai Dua and Permatang Berangan. I agree that the State Government will take the initiative to set up a task force, or whatever it is, on the pigs and also the monkeys that are now living in the community. I also request that all parties be involved, both from the Opposition and, this is, the State Assemblymen of the constituencies concerned, in the task force so that this matter can be discussed more seriously, on how we can tackle this matter.

Dato' Speaker, I have also received a reply regarding this stray dog case, whose population in the Sungai Acheh area is indeed too high. However, when the operation is carried out by MBSP, most of it is done during the day, while these dogs are active at night.

And I think perhaps MBSP can improve this operation, or, together with the community, I am willing, in the Sungai Acheh area, for us to sit down together with, sit down with the MBSP Health Department to discuss the times or locations where these dogs are active. This is because in the Sungai Acheh area, the dog population can be large because there are fish farming ponds, and land where they give birth, and they are not properly looked after, and eventually they stay in the village. They stay in human settlement areas.

So I hope there might be a method, or during operation hours, during active hours, at night, we can help together with MBSP to identify the locations where these dogs are active.

And one more thing. I touch on what was raised by Yang Terutama Tun at the recent opening of the House, the fly issue. The fly issue, I think, is the same as what was raised earlier, when T.Y.T. was at Jawi Golf. While eating, there are flies. Recently, at the programme in the Jawi area, I happened to sit at the same table as Tun, and Tun was swatting them away. We should, I think, at the level of perhaps the Agriculture EXCO, look again at livestock methods, whether chicken farming or the cultivation of plants that use chicken waste or droppings, and how to adopt methods so that fly breeding can be eliminated or at least reduced. Because sometimes we feel embarrassed. I would add, when I went to the Deputy Speaker's Hari Raya open house, the food was black with them. But I don't know, perhaps I arrived a little late to the Yang Amat Berhormat Ketua Menteri, but there are indeed too many flies, which I feel has not been resolved to this day.

So, when Tun raised this at the opening of the House, I think we must take responsibility to resolve the fly issue in the SPS area, and I think perhaps the SPU area too, where there are chicken farms. Perhaps we need to look again, including with the planting areas such as Ara Kuda, where the use of chicken droppings has become widespread. With the fertiliser situation now going up, people have switched to using chicken dung fertiliser. In oil palm plantations, I have observed, they do not do it like placing a sack there; they just cut the four sides, and let the rainwater dispose of itself into these trees. So I think there must be a method that they need to take responsibility for, so that this matter does not become something people say is a problem for the area, especially in the SPS area.

Dato Speaker, it is one o'clock now. I can go on a little longer.

Speaker (Speaker)

Sikit boleh

(YB. Zulkifli bin Ibrahim): I can still go on a little. One more thing I want to touch on is the issue raised by the Qaryah Mosques in my constituency. In this area, what is its name, Sungai Acheh, where they have been asked to, what is it, take up or adapt the Pro Mosque Management System. I have also received a letter, I think possibly the Sungai Dua area too, asking that it be made mandatory that the company, what is its name, the Pro Mosque Management Party, be used, even though some mosques already have their own apps, their own apps to record the qaryah children in the mosque. That is an initiative implemented by the mosque, but they do not want to use it; they must request this management from Mairis Dinasty Network Sdn Bhd.

I looked, I also searched for this company. This company was established in August 2020, with 5 Board of Directors members, and there are no financial statements, but it has been given, what is it, a contract to manage data for the Qaryah Mosques, which the system requires to be purchased at a value of RM10,000. When some mosques complain, some mosques cannot afford it, well, Zakat has to pay RM10,000, eh, RM5,000, the mosque pays only RM5,000, not including maintenance. So I ask, why does it have to be done, when if we put it under the Islamic Religious Council to manage that, as MP, I think it could be given to the mosques free of charge. But it is managed and uses zakat money of RM5,000 for each mosque, of which there are 214 mosques, just to give to this company.

So I think perhaps, I think perhaps the friend from Pinang Tunggal can answer this issue later, because the problem with Mairis Dinasty is that it has no financial records at all and was only just established, yet is given a lot. If this project requires all mosques to pay RM200,.. RM2.1 million to manage it, and that is not including maintenance, it only buys the app first, then the mosques must pay every year for maintenance. So I hope this matter can be looked at more carefully, because there are mosques that cannot afford it, such as in Sungai Chenaam, where for Friday prayers they can barely get RM500, or RM1,000. So, when they cannot afford it, they are asked to use zakat fund money. So I think we must manage this properly, not in this way.

So I hope this matter is taken seriously, and we need to look again, especially involving all the qaryahs in the mosques in this Penang area.

So I think that is all for now, Honourable Dato' Speaker, and insyaAllah I also, what is the name, on behalf of the representatives, request to meet the whole house this afternoon if there is an opportunity, and, what is it, I ask forgiveness and pardon if throughout my time in this State Legislative Assembly I have hurt the feelings of any party.

That is all. Wabillahi Taufik wal Hidayah, Wassalamualaikum Warahmatullahi Taala Wabarakatuh. Thank you.

Speaker (Speaker)EN

Thank you.

Y.A.B. Chief Minister, Dato' Speaker.

Speaker (Speaker)EN

Please.

Y.A.B. Chief Minister: In accordance with Rule 6A (1) of the Peraturan-Peraturan Majlis Mesyuarat Dewan Undangan Negeri Pulau Pinang, I request that the sitting time for today be extended until 6.30 p.m.

Speaker (Speaker)

Ada sokongan?

Phee Boon PohDAP · PHSungai Puyu

Saya menyokong.

Speaker (Speaker)EN

Thank you. Honourable Members, the Most Honourable Chief Minister has moved a motion under Rule 6A (1) to extend the sitting time for today, Wednesday, 1 June, until 6.30 p.m. Honourable Members who agree, say "Yes".

Members of the House: "Yes"

Speaker (Speaker)EN

Honourable Members who do not agree, say "No". The motion is agreed to without objection. So I will proceed with the debate session for today, please. Who else? Okay, thankfully, if there is no one else, I will close. Please.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Assalamualaikumwarahmatullahiwabarakatuh, Salam Sejahtera. Honourable Dato' Speaker, Chief Minister, members of the State Executive Council, Heads of Department, members of the media.

Alhamdulillah, praise be to Allah, that I have been given the turn for Pulau Betong to join in debating several important issues that I wish to raise for the attention of the EXCO and the State Government, in order to strengthen the welfare of the people of this State of Penang. Dato' Yang di-Pertua, I welcome the opening speech of His Excellency Tun Dato' Seri Utama Ahmad Fuzi bin Abdul Razak, Yang di-Pertua Negeri of Penang, which touched on all aspects, among them the upgrading of the economy, trade and industry, the digital economy, Human Capital Development, Agro-Technology Tourism and Rural Development. Improving the quality of life, Housing, Youth and Sports, Infrastructure and Transportation, Flood Mitigation Projects, Water Supply, Islamic Religious Affairs and matters relating to the environment. I also take part in debating several aspects spoken by His Excellency Tun, as well as the other members of the House who will touch on the aspects that have been stated. Before that, I fully support the speech of His Excellency Tun. The State Government has launched a three (3) year performance report card, from May 2018 to September 2021, as a commitment to achieving the Penang2030 vision and ensuring that the State Government remains on the right track and does not deviate from the set goals. Based on that report, most of the actions to achieve the Penang2030 vision have been set in motion and demonstrate the accountability of the State Government. Members of the House, the first issue concerns my opportunity to express my thanks to the Penang State Government, namely the EXCO for Housing and Local Government, and also the Housing Board, for the implementation of the Taman Idaman Prestige or K-Park Housing Project, which has offered a total of 1,175 units, of which 612 units are under the RTO hire-purchase scheme. Members of the House and honourable colleagues, given that the units will begin to be occupied soon and there is only one exit road in and out of the area, it is certain that traffic congestion will arise, especially during peak hours in the early morning, at noon and also at knock-off time. Therefore, as a local issue, I suggest that an alternative road be built to provide comfort to the residents of K-Park and also to the other nearby housing areas that use that route every day. We raise all these issues. Regarding the planning of three (3) more housing projects in the Pulau Betong State Constituency, which will provide nearly 2,000 housing units, I call on the State Government to identify units from all three housing projects to be built in Pulau Betong State Constituency to be offered under the hire-purchase scheme, so that more residents of the South West District in particular, and the residents of Pulau Betong State Constituency in general, who find it difficult to obtain housing loans, can be helped to own homes.

Dato' Yang di-Pertua, the second issue concerns traffic. The traffic congestion problem raised by my colleague, namely Bayan Lepas, from Bukit Belah to Puspakom, Jalan Teluk Kumbar, which was stated, as I recall, at the State Legislative Assembly sitting of November 2021, was raised because it also caused the road to be a problem for the residents of Pulau Betong. Likewise, throughout the sittings of Parliament, Members of Parliament also raised this issue and asked the Penang Public Works Department (JKR) to take action to resolve this problem, so that the Ministry of Works, it is understood, has not yet received approval from the Economic Planning Unit (EPU). Members of the House, various alternatives have been carried out by the relevant agencies, but the congestion still has not been overcome, even with Traffic Police officers deployed to control the congestion. Therefore, I respectfully request the good offices of the State Government to consider the proposal of the JKR through the meeting of the JPPD, the District Project Planning and Evaluation Committee, in the South West District, for the State Government to help by using State Government allocations or MARRIS to upgrade the alignment of the roads slightly, particularly at the junction of Jalan Bukit Belah to Simpang Tiga and Jalan Sungai Batu, while awaiting the Ministry's approval. Likewise, I wish to raise the issue in Air Putih, Balik Pulau. My side also requests the State Government to consider the application for the installation of traffic lights at Simpang Tiga, Taman Manggis, to overcome the congestion that results from the many housing areas that have been built and also commercial centres. This issue has also been raised every time at the State Assembly sitting, so that our calls receive attention; applications from the MPKK, from the local residents, and from the nearby mosques and surau, asking that Representatives extend this matter to the authorities concerned to resolve this problem. Once again I raise it in this House, for the State Government to consider the matter so that the problems raised by the local people receive attention. Dato' Yang di-Pertua Speaker, the third matter, concerning agriculture and what is happening now in Penang, is the durian harvest. We all know this. I wish to congratulate the Department of Agriculture, which has adopted an approach, including the Field Visit Programme, also referred to as Customer Meeting Day, which involves meeting farmers and entrepreneurs and providing guidance, whereby the department has obtained a clear picture of the problems faced by farmers or entrepreneurs. Likewise, my congratulations regarding this durian matter: the Agriculture side has focused on the many popular durian clones in Penang located in the Balik Pulau district, in order to increase the production and quality of durians this year. For your information, I have received information that 334,000 is involved in Government-funded projects for the construction of farm roads, replanting with selected clones, installation of irrigation systems, inputs of pesticides and fertiliser, and so on. These are intended to increase the income of farmers, namely in relation to durians. I also want to inform you that, as everyone knows, the place in Balik Pulau where visitors come to enjoy durians is Anjung Indah, Balik Pulau. But what I learned when I visited there was the complaint from visitors who came to Penang wishing to enjoy the delicious durians. Many have come, but the problem raised by them is that when we speak in the speech of Tun about how the Government has launched a good report card, what I got from customers or tourists who came was the remark "Indah Khabar Dari Rupa" (good news from afar, but the reality differs). Why? Because the facilities there include toilets that have no water supply. His Excellency Tun also raised the issue of water, as is already well known, that raw water supply is an important basic requirement of a country and a state. Raw water supply is essential for the people and a catalyst for the development of this state. In view of this, it is important for the State Government to take this issue seriously. Many of our representatives have mentioned the water issue, but what is most important is that water supply is the basic essential for toilets when visitors come; children and wives need to use the toilet, but the problem is that water cannot be supplied there. I hope the State Government can do many things that we can implement. The name of Penang is famous for its Vision 2030, but this small problem surely cannot be beyond the ability of the State Government to solve. I thank the District Office very much for its efforts to obtain a water supply, and I urge the City Council, for now, during the durian season, with us receiving tourists at Anjung Indah, to request that the City Council supply water temporarily during this durian season, so that visitors can enjoy the delicious durians and tourists can also come to Penang, particularly to Anjung Indah. The matters mentioned earlier concerning basic amenities can be resolved. My hope, and likewise the hope of the District Office, is that within this short period, this short-term period, water can be supplied, particularly by the City Council, for basic facilities and toilet use at Anjung Indah. For your information, the water source at Anjung Indah is under the supervision of the Forestry Department, and as we know, a rainwater harvesting system has been used to obtain the water supply at Anjung Indah. I hope that in the long term, the basic toilet facilities at Anjung Indah will be made suitable for the number of tourists, as also mentioned by His Excellency Tun, who opened up this tourism, so that by enjoying these durians, the comfort of these toilets can also be resolved. Three times in the State Assembly sittings, Pulau Betong has raised this, yet it still has not been resolved, even though this water and these toilets are one of the problems that are clear, but we hope that this time the State Government will see it as something that will protect the image of Penang and the image of the Government, so that this matter is resolved. Thank you to the District Office for its efforts, and to the City Council, to ensure that there is a water supply for basic facilities, to uphold the name of Penang and encourage tourists to come to Penang. Members of the House, the third matter I wish to raise concerns the People's Welfare Programme, the i-Sejahtera Welfare Programme. The Penang State Government began to introduce this around 2014 under the Pakatan Harapan Government, namely the senior citizens, golden mothers, golden children, golden students, single mothers and persons with disabilities (OKU). The Golden Students scheme was also abolished at PRU14. I request that the State Government reconsider the Golden Students Scheme, which has been reintroduced. Its additional provision in this new normal learning will surely help students in Penang to pay for internet costs so that they do not fall behind in their studies. The payment rates for the senior citizens, single mothers and golden mothers schemes need to be increased and given periodically, for example three times a year. Most single mothers need more than RM100 for monthly expenses from the amount given through this scheme, and it is given only once a year. In addition, in the transition to the endemic era, groups such as senior citizens, single mothers, fishermen and OKU are deeply affected and burdened by economic factors. I call on the State Government to reconsider the payment rates that have been set, and the time has come for these payment rates to be increased and given periodically, and not only once a year. This is among the voices we hear when we deal with the community. Monthly benefits for Penang senior citizen voters of RM300 to RM500 are appropriate to implement, and other benefits for Penang residents such as a family medical card benefit of RM500 to RM1,000 a year. A grocery purchase voucher of RM500 a month for the B40 group… (with permission), and for senior citizens. Creating a senior citizen card for free Rapid bus transport benefits and a discount card for hotel services are what the B40 group in society hope for. Honourable House, Dato' Speaker, among the matters I want to raise today is the relocation of the JKM Office in the South West District. The issue is the relocation of the South West Social Welfare Department (JKM) Office, located in the Penang City Council Complex in Balik Pulau on the ground floor with an area of 3,500 square feet and a staff strength of 30 people, which will be moved to the upper floor. The upper floor has an area of 1,000 square feet, which of course has a limited working space for many staff, and the new space offered does not only fail to provide comfort for JKM staff, but will also have an impact on whom? On the members of the public who deal with JKM, especially those who are disabled, those in wheelchairs, who will surely find it difficult to obtain services because the route to the upper floor has only stairs and no lift is provided. Dato' Speaker, the existing JKM Office is located next to the CAT Dialysis Centre, and it is understood that CAT applied for additional space, but the decision made by the City Council offered this JKM office to the applicant of that application, and it is understood that CAT has received an approval letter. I also request the attention of YB EXCO to give the proper justice not only to the JKM working staff with their narrow space capacity, and to give the appropriate consideration to the CAT dialysis patients, but also to take into account the public who visit JKM every day to obtain services at this JKM. From the ground floor to the upper floor, for those in wheelchairs, this also makes things difficult for them. We also take into account the welfare and comfort of the members of the public who come to contact JKM. Immediate action to resolve this issue is very important so that both services can continue to operate as usual, and the action does not disrupt their other operations. Members of the House, and among the others that I want to raise is the issue concerning housing developers, who must provide, in relation to a surau site and so on. This was also raised, among other things, about the limitation of these basic facilities. Recently my side received complaints that the area of that site is small and cannot meet the needs for building surau facilities. I suggest that the local authorities (PBT) discuss with the Penang Islamic Religious Department (JAIPP) or the Penang Islamic Religious Council (MAINPP) to overcome this problem. This site should ideally meet the planning requirements for the facilities to be provided at the surau, including the facilities that exist in a comfortable congregational prayer hall with a capacity of 200 people for worship and also for religious gatherings. A complete study space and classes, a place for ablution (wuduk), and toilets and bathrooms that are separate, a special area for the management of funerals, because we know that the capacity of flats and similar housing will make the management of funerals difficult when a death occurs. A surau administrative office, a storage room, and a space separate from the surau's main building, as well as a parking area for cars or motorcycles for the convenience of worshippers. I recommend that the City Council hold collaborative discussions with the Penang Islamic Religious Department on this capacity, to achieve the comfort of worshippers or the surau… (interruption).

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Mohon mencelah. Dato' Speaker, mohon mencelah. Terima kasih.

Excuse me, I would like to interject. Dato' Speaker, may I interject. Thank you. I was interested in what was presented by the Honourable Member for Pulau Betong just now. In my debate speech I also touched on the provision of land for places of worship, including places of worship for non-Muslims, and do you agree with the Honourable Member for Pulau Betong if I say that the MBPP must place emphasis not only on the size of the land, which is a requirement, but also on the locations given for the building of places of worship, including places of worship for non-Muslims, because we see that most of the locations are unsuitable. For example, locations near housing areas, adjacent to the IWK sewage treatment tank, and land of a triangular shape and so on. So, does the Honourable Member for Pulau Betong agree that the local authorities should examine these sites carefully before accepting them? Thank you.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Ahli Kawasan Bayan Lepas, nak masuk dulu?

Bayan Lepas Member, would you like to go first?

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

Dato' Speaker, thank you, Honourable Member for Pulau Betong. The same issue that I raised in the previous State Assembly sitting, and I take this opportunity from the debate of the Honourable Member for Pulau Betong. The issue raised concerns the site for Muslim worship, or more precisely, the site for the building of a surau. For your information, the site of Surau Bayu Nyaman, for example, has taken nearly six (6) years and still cannot be resolved, because the land area given by HUNZA is only about 2,000 square feet, and very unfortunately, its angle does not match the direction of the qiblah. So it is troublesome and difficult to build and also to make it comfortable in line with the qiblah. Therefore, what I was informed in my written question is that this matter may not occur in the mainland area under MBSP. It mostly happens in the island area, perhaps because MAINPP was not invited or is not part of the OSC Council Members. So I hereby strongly demand that a representative of MAINPP be included as a member of the MBPP OSC Committee to safeguard Islamic interests. Thank you.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Thank you to the Honourable Batu Uban and also the Honourable Bayan Lepas. I request the State Government and also the Honourable Datok Keramat to give attention to the two (2) issues raised, and I bring forward this issue, namely the surau to be jointly discussed with the Penang Islamic Religious Council, and likewise regarding RIBI, whether this is a suitable place, a reasonable place, to be made a place of worship, which requires joint discussion so that this matter is not raised or becomes a complaint among the public. Honourable Dato' Speaker, the Safe Family Policy towards a Violence-Free Penang was established since July 2020. Congratulations to the Honourable Padang Lalang, who has taken the initial step by establishing the first support point at the State Assemblyman Service Centres towards the Penang2030 Mission. Recently, we are often shocked by incidents of those who take the easy way out in resolving the predicament of life by taking action such as what was raised today by the joint House Sitting, namely the act of jumping from a bridge. All of this is something we hear about together in the media, or that we encounter when we pass the Penang Bridge. We were also shocked by the case of a trainee doctor who likewise took the approach of jumping from a building. We extend our condolences to the families involved. Thus, it can be concluded that such actions tend to be taken by anyone who is burdened with pressure regardless of educational background, whether professionals or not. This problem is very serious. This problem should be addressed by the relevant parties together with the State Government in line with the Safe Family Policy. Based on the extraordinary increase in divorce cases, the Most Honourable Dato' Dr. Hj. Mohd Na'im Bin Haji Mokhtar, Director-General and Chief Syarie Judge of the National Syariah Judiciary Department (JKSN), informed us that a total of 6,569 divorce cases were recorded during the MCO period, namely from 18 March 2020 to 18 June 2020. And suicide cases involved 609 cases in 2019, 631; 2020 and 498 cases from January to May last year, based on these statistics. The methods of suicide that frequently occurred were hanging 75.1%, jumping from buildings 13.6%, and consuming poison 5.7%. These are the increase in divorce cases that we obtained from the Most Honourable Dato' Hj. Mohd Na'im, these statistics. Therefore, in line with this Safe Family Policy, investigations found three causes behind the incidents. These are: 1. Family problems; 2. Financial problems; and 3. Emotional stress problems.

Therefore, to strengthen this Safe Family Policy, the time has come for us to work together with the Penang State Government to plan the re-activation of the Family Health Clinic, so that we together ensure that all districts are effectively served, and that hotlines are activated at all first support point centres to facilitate the target group in engaging, because most victims are ashamed to come face to face at the centres to obtain assistance. Staff involved at the first support points are given regular training to improve their competence in helping victims. The Family Health Clinic also provides mental health services, in building psychological well-being. Based on Maslow's Hierarchy Theory, the factors contributing to psychological well-being involve five human needs: 1. Basic needs; 2. Safety needs; 3. Love and belonging needs; 4. Esteem needs; and 5. Self-actualisation needs.

When these five needs are not fulfilled, then psychological unwellness arises, namely feelings of sadness…(interruption).

Speaker (Speaker)

Yang Berhormat.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Feelings of disappointment…(interruption). Yes.

Speaker (Speaker)EN

Honourable Member. Your time is up.

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Okay, a little more.

Speaker (Speaker)

Sikit lagi.

Haji Mohd Tuah Bin IsmailPKR · PHPulau BetongEN

Feelings of stress, gloom, anxiety and so on. These contribute to the violence of divorce and ultimately acts of suicide. Therefore, an effective support system is very much needed and must be expedited effectively. Representatives of the House, Dato' Speaker, in line with the Penang2030 Vision, namely giving focus and emphasis to the development of family institutions, and also including the green and smart aspects as the direction in the administration of the state over the next 10 years.

"Buy a whole jar of gulai,

Gulai mixed with honey water, the people's wishes must be attended to,

Hopefully the community will be united"

In order to make this state prosperous and developing, surely the provision of family institutions and well-being will be able to develop the state and the people. I conclude with my words of thanks. I support the speech of His Excellency Tun, thank you.

Speaker (Speaker)EN

Thank you, Pulau Betong. I would like to invite, who else wishes to debate. Please, Telok Ayer Tawar.

Dato’ Mustafa Kamal bin AhmadPKR · PHTelok Ayer TawarEN

Assalamualaikum Warahmatullahi Wabarakatuh. Salam Sejahtera. Bismillahirrahmanirrahim. Yang di-Pertua of the Penang State Legislative Assembly, the Most Honourable Chief Minister of Penang, the Honourable Members of the State Executive Council and the Members of the State Legislative Assembly. Gentlemen and ladies whom I respect all, Alhamdulillah, once again and gratitude be rendered to the presence of Allah Subhanahu Wa Taala, because by His permission and will alone, we are able to gather normally, attending this noble House to hold the Fifth Session of the 14th Penang State Legislative Assembly. Today, without us realising, two months have passed since Malaysia entered the Transition to Endemic Phase. We are nearly successful in facing and handling this pandemic with full unity as a strong, resilient and disciplined Malaysian nation. Certainly, it also comes from the efforts of us all, whether on the government side, namely my friends here on this side, or my strategic partner friends over there. Because here is the platform and stage for us as Honourable Members, to put forward arguments, to offer constructive views, to debate with logical reasoning, to share ideas and information, to function well as checks and balances regarding any issue raised.

Certainly, we do all this for nothing other than to fulfil our responsibilities. Not merely as Honourable Members, but even further than that. We are representatives supported by the grassroots, chosen by the people through General Elections, to shoulder tasks full of challenges, to shoulder tasks full of challenges, although we could choose other lighter tasks to bear this trust. Honourable Dato' Deputy Speaker, on this occasion, I wish to express my highest appreciation and thanks to Tun Dato' Seri Utama Ahmad Fuzi bin Haji Abdul Razak for his kindness in delivering the opening speech for the First Meeting of the Fifth Session of the Penang State Legislative Assembly a few days ago. I also wish to record my congratulations and praise to the Honourable Dato' Speaker and the Honourable Dato' Deputy Speaker, for conducting this sitting so perfectly, smoothly, orderly, complying with all rules, and adhering to the bounds and principles of the law that have been set. I also do not want to miss out on thanking all Members of the State Executive Council who are truly committed to developing professional competence. They are very dedicated, determined and provide excellent service. They also possess the characteristics of an innovative workforce and encourage me to add value to services in line with the current situation which requires change in all aspects. Through the guidance and assistance provided, I use it to the best of my ability by placing emphasis on governance, problem solving, communication with the people as well as, effectively, and various other aspects taken into account in providing the best service for the people of this state with first-class quality. May it continue to be significant and form a clean and prosperous government administration. Honourable Dato' Deputy Speaker, I welcome the State Government's intention to instil a positive culture in forming a liveable state. This enables the people to become increasingly active and energetic with optimal access through physical activities. The State Government has planned all plans or its own plans in an inclusive and comprehensive manner, which clearly, in detail and explicitly outline the policies and implementation procedures as a sports-friendly state. This includes the approval of allocations for the construction of a sepak takraw court at Pekan Darat, Telok Air Tawar. Therefore, to appreciate that support, I extend a thousand thanks to the EXCO for Youth and Sports who has helped greatly in carrying out the transformation in Telok Air Tawar. It brings many benefits to the local community, because sports facilities can act as a reflection of the government's perseverance in developing sports infrastructure. Honourable Dato' Deputy Speaker, what is more important is that the people, regardless of age limits and political ideology, can enjoy the facilities provided. We must also look at the broader perspective of producing citizens who are healthy physically and mentally. Sports is not only used as a platform in achieving government policy, but it also unites racial diversity. Sports development can also foster friendship among the people.

When a type of sport is represented by participants from various races, they will certainly work together and help each other to achieve one goal, namely success. While in one group, a sense of togetherness arises among them. This spirit is very important for creating racial unity in this state. Besides that, unity can also be nurtured among spectators when they support the same team. The value of unity becomes the foundation for the people to develop the state's sports. Therefore, every member of society should accustom themselves to sports that suit their interests, abilities and capacities. The State Government's willingness to do so is based on the awareness that sports not only bring benefits to individuals, but also contribute towards the development of the state. Recognising this truth, the State Government has spent a lot of money to provide sports infrastructure for the public. Through facilities like this, we can promote the care of the State Government in providing the needs of the people. I, as the representative tasked with looking after the welfare of the people in Telok Air Tawar, hope that we take a firm stand in efforts to develop the field of sports in this state where the attitude or scope of its facilities is broader, namely facilities based on what the people need. We need to understand all that should be done first in order to fulfil the needs of the people, fulfil the needs of the people. Honourable Dato' Deputy Speaker, I also wish to record my gratitude that the State Government continues its efforts to maintain well-being in Telok Air Tawar in making it a tourism hub. To strengthen this effort, on 29 May last year, 2022, Robina Eco Park Phase Two was successfully officiated by His Excellency the Yang di-Pertua Negeri of Penang. That place has great potential to be developed and its strategic location facing the very enchanting beauty of the sea. This new focal point is realised with careful planning. In addition, it can generate high-impact investment, create employment opportunities, increase the people's economy to a more stable level considering the cost of living is seen to be rising due to unexpected prices of goods, strengthen the state's tourism industry, and act to attract visitors from outside to this beautiful state. Honourable Dato' Deputy Speaker, we have started to act and move forward, planning for the welfare of the people and the prosperity of the state and the prosperity of the state. Various challenges and trials are faced, but they have yielded results. I urge that the great facilities and benefits from this State Government are not wasted, just as how difficult and laborious it was for us to strive to make it succeed, just as how resolute our energy is to defend it. We do not want Penang to be labelled as a tourist hotspot only on paper, but we must make it appropriate to the real situation when looking at its tourism development. We also do not want Penang's potential to be tarnished by unhealthy elements. We must explore and fully utilise it, because it has a major impact especially on the local community's eco-tourism sector.

Honourable Dato' Deputy Speaker, as Members of the State Legislative Assembly, whatever actions and efforts we take will always attract the attention of the people. Therefore, I request that the Honourable Members rise up briskly, continue working, united in one team. Like one clump like bamboo, one stem like sugarcane, one bundle like betel leaves, let us strengthen the State of Penang, let us do it with sincere hearts in providing the best service to the people and the beloved State of Penang. In conclusion, I hope that our state, the people of Penang, will continue to receive protection from the Almighty and always be showered with blessings so that the multiracial people can enjoy the peace and prosperity bestowed. To Allah SWT we ask for prayers and help, to Him alone we return, return all matters. Dato' Yang di-Pertua, I request to support the speech of Tun. That is all. Wabillahhi taufik, wal hidayah, Warahmatullahi Wabaruhkahtu.

Deputy Speaker of the HouseEN

Thank you, Telok Ayer Tawar. Permatang Pasir, you have the floor.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Bismillahirahmanirrahim. Alhamdulillahi Rabbil 'Alamin Wassalatu Wassalamu 'Ala-Asyarafil Anbiya'e Wal Mursalin Wa'ala Alihi Wasahbihi Ajma'in. Thank you, Honourable Deputy Speaker, I express my thanks for giving me the opportunity to debate together, the motion of thanks on the speech of the Yang di-Pertua Negeri of Penang. We have moved on to the fourth year of the Pakatan Harapan State Government administration in Penang and congratulations to the Chief Minister and the EXCO line-up on the success of fulfilling 90% of the manifesto, and this success would not have been achieved without hard work, commitment and also the support of all Government Officers at all levels, whether at state or district level, or at all agencies, GLCs, and we hope this cooperation will continue because to make any Government project or programme succeed requires the collaboration of all parties involved, and likewise in Permatang Pasir there are no less numerous development projects and community programmes. I also take this opportunity to say thank you. I think this is the last sitting before we face the Fifteenth General Election. Heading towards PRU ke-15, I emphasised earlier that we have fulfilled 90% of the manifesto. I am somewhat surprised and doubtful, Mr Deputy Speaker, why the Opposition in this noble House is questioning the percentage evaluated, whereas they do not have any constructive arguments. For me, let us be a constructive Opposition, evaluating performance, many projects have been carried out and are in the process of implementation, and this is an indication that this manifesto has been implemented. I would like to invite my Opposition colleagues to reflect on themselves: what about the manifestos of the Opposition parties at the Federal level? There is not even one manifesto. The Government that exists today, consisting of Parti Umno, Barisan Nasional, Pas and also Bersatu, is a Government that is not based on any manifesto. Reflect on yourselves first before you want to ridicule the Pakatan Harapan Government in Penang. Whether you say 60%, 80%, 90%...(interruption), that is an evaluation, but the reality is the Penang Government standing today, for 4 years has had a manifesto. Compared with the Federal Government, there is no manifesto. I will give the opportunity to my colleague.

Thank you, Permatang Pasir. It is already challenging from the start. Thank you, Permatang Pasir, but I want to stress here that we in the Opposition, in my speech I mentioned failures or shortcomings as a form of criticism, we see that the achievement is 90%. I congratulate you, but I said in terms of impact, effect, and also the equitable justice in implementing the activities carried out and the programmes carried out, not all of them achieve a comprehensive effect and impact or cover the parties who need them, and this needs to be looked at again. We cannot look only at the physical aspect without looking at the achievement, impact, and effect covering the various parties who need it, the people who need it. There are programmes and activities under certain themes that do not directly, that do not achieve the best outcome for all of society. That needs to be improved, needs to be looked at. That is a criticism that can bring a benefit to the State Government, which needs to take action. As for the manifesto, if we want to look at the promises, there are many promises made before the elections, including in the manifesto, that have still not been fulfilled. I mentioned earlier in terms of tolls and so on that have still not been fulfilled, and in terms of what was just said, that the government now has no manifesto, there is none of this. Before, after GE14, PH took over the administration, and we know the BN government, the coalition government, the combination of 2, 3 parties, there was a concept in it. So it may need a certain amount of time, and I think in the administration now there is its concept, there are things done with the Opposition to make an MOU and so on, and Keluarga Malaysia is a concept currently being implemented, and I see there are, there are good effects in that respect, in terms of implementation. So these are matters that need to be arranged, that were done, which are also the same as the PH manifesto, which requires integrated implementation among all parties. So this is what I see.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Dato' Opposition Leader, despite the interjection just now, although what I emphasised… (interruption), Dato' Opposition Leader, should first look at himself in the mirror. If Pakatan Harapan places a mirror in front of him, there will be a reflection, but if the Federal Government today places a mirror, it will not see anything, because there is no manifesto. That is why I said earlier that many of the arguments and debates raised by our Opposition colleagues touch on this assessment, because they have no manifesto to sell to the people. So ahead of this general election, what will they sell to the people in their campaign? If it is Pakatan Harapan, we can say we have fulfilled 90%. Well, this is not a political matter, Deputy Speaker, this is a matter of fact. The fact is that the government standing today is a backdoor government that was not chosen by the people's mandate, so there is no manifesto. So when there is no manifesto, they are jealous of the Pakatan Harapan Government. That is what has happened, because they have no material to use as campaign content to show that they have fulfilled their promises to the people. And it is evident that we have succeeded in administering Penang well. Imagine if the same period had been given to this opportunity for the Federal Government, when PH administered the Federal Government, surely many more of the promises we attached to our manifesto at GE14 could have been fulfilled. But we were betrayed, we were only given 22 months in power, but they rejected us by not having or failing to fulfil the manifesto. This is not fair. We see to… (interruption).

22 months, I think many promises were not fulfilled. Many things that have… (interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

The term was not complete, which is why we compare 4 years with 22 months… (interruption), 22 months is not even 2 years. So if I want to respond a little… (interruption).

There are many, if I want to mention many things that were not done… (interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

What was not done?

Many things that were not implemented in terms of promises… (interruption).

Deputy Speaker of the HouseEN

It's alright, Sungai Dua. Say what has been done by your party, and there is no need to mention what has not been done… (interruption).

No, we have to mention… (interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

I want to hear what was not done… (interruption), what was not done?

Honourable Deputy Speaker of the House. Or was it not done?

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Yes, what was not done?... (interruption)

Dak, banyak…(gangguan).

Deputy Speaker of the HouseEN

Permatang Pasir, please proceed.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

… (interruption), you must be specific about what was not done… (interruption).

(Interruption) Many things were not done, things not yet implemented, promises, for example, we want to, what, abolish PTPTN. (Interruption) that promise, today

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

That is in the Penaga manifesto… (interruption). In the Penaga party manifesto there is a plan to abolish PTPTN. The PH manifesto does not mention abolishing PTPTN… (interruption).

Yes. There are many more things… (interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

No. We only have a manifesto to reduce repayments. So I think the Opposition Leader has no facts, no facts, his facts are wrong.

Honourable Deputy Speaker of the House, Sungai Dua is facing me. If you look… (interruption).

Banyak lagi…(gangguan).

Deputy Speaker of the HouseEN

Sungai Dua is facing me, please don't look back. You talk too much now… (interruption).

What PH promised and did not do… (interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

(Interruption) Many, many. I, I will list them for the Opposition Leader.

(Interruption) I want to ask about the federation.

Muhammad Faiz bin FadzilAMANAH · PHPermatang Pasir

Okey.

We are talking about the state, let's talk about the state, lah… (interruption).

Deputy Speaker of the HouseEN

Sungai Dua, backup, backup has already reached the back.

He is speaking… (interruption), sometimes you have to face the face… (interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Okay. If given the chance, Deputy Dato' Opposition, within only 22 months we have restored the country's economy: FDI of RM82.4 billion in 2019, Federal Government revenue in 2019 increased by 13.5%, amounting to RM31.5 billion, we abolished the GST, and we stabilised petrol prices by injecting subsidies. Today many people, including the Leader of the Opposition, are enjoying petrol at RM2.08 per litre. Toll rates were reduced, including for the Penang Bridge. These are among the achievements I can share with Dato' Leader of the Opposition about the Federal Government. But I want to say that in four years, if we in Penang can deliver 90%, then if we were given the same opportunity at the Federal level, we would certainly deliver more than 90%. But if we have the government we have today, and we hear that at the end of the tunnel the GST is to be reinstated, and then comes a proposal from "malu apa bosku". Not only is he shameless, he is losing billions of ringgit to implement the GST in this country, and its impact will also fall on the people of Penang. If I were the Leader of the Opposition, I would stand up first and fight against "malu bossku, boss dia". Okay, so these are the achievements we have enjoyed over four (4) years. So Dato' Deputy Speaker, looking at these achievements, we see the Auditor General's report on Tuesday which said that the finances of the Penang State Government are in a very strong position, where the total amount of money in the consolidated account is almost RM1.821 billion. This is an achievement for the Penang State Government, and I feel that high revenue should be shared together so as to ensure that not only the physical development of Penang continues to be sustained, but also that the lives of the people continue to be prosperous. Yesterday we passed an important motion on food security, and yesterday I did not get the opportunity to debate.

I also seek permission from Deputy Speaker to debate this issue because it is close to our hearts, close to the pulse of the people, Deputy Speaker. We import food in its entirety; we import food items worth almost RM55.5 billion a year. This is a large amount, and our country is also rich in agricultural resources, yet why are we facing a food crisis, and why has food security, or the safety of food, become an issue discussed every day by the people of Malaysia. We are not only facing high and soaring prices of goods today, but we are also facing a crisis of insufficient food supply. Therefore I propose that the Penang State Government provide more allocation to ensure food security in Penang is guaranteed, so that the well-being of our people continues to be safeguarded and protected. The latest issue we read about in the media is the shortage of fish supply. Fish also plays an important role in ensuring sufficient protein for the people of this state. In the speech of the Penang Chief Minister, it was mentioned that the cage fish in Penang are the highest in the country, but I believe these fish are for export and not for local consumption, and today we want to discuss how we can find methods so that the local fish supply is sufficient? Especially during peak periods such as festive seasons and so on, and I request that I propose that the Penang State Government, through the EXCO for Agriculture, move together in an integrative manner, with integration with government agencies, whether at the Federal or State level. To ensure these supply stocks are always available and can be used during times of supply shortage, and therefore we need to increase the construction of cold rooms or refrigerators, and this can be undertaken by the State Government without waiting for the action of the Central Government, which is indeed sluggish and has no strategy or action plan to control matters that have become such a critical problem today. That is the matter of fish; regarding chicken, we are aware that the prices of food inputs or basic ingredients for chicken, such as bran, are expensive because we import inputs such as corn and so on, which have pushed up the price of goods, that is the reason given. So we need a decisive, efficient and comprehensive action, on how we can help the many chicken farms in this state obtain cheap bran. So there needs to be a comprehensive and integrative action or action plan between food input producers and also with chicken farmers. I propose that the Penang State Government optimise the use of idle land available in the State of Penang so that we can use this land, by leasing it or through the TOL method, to private players who are interested in growing corn and also grains suitable for making bran. And in this period I also call on the Penang Government, as I have emphasised before, to enact a law to control the sale of paddy fields to be turned into lidi lot land or residential land, which has reduced agricultural land, paddy field land. In Seberang Perai Tengah, Deputy Speaker, it is estimated that paddy field land has decreased to only 2,389 hectares today, and if we do not control the efforts to sell this lidi lot land or bungalow lot land, then these paddy fields will continue to decrease, and this will affect our food supply in the future, and we will face increasingly critical food security problems, and we will have to depend on imports. If we depend on imported goods, we have to evaluate those imported goods against the position of our ringgit; if it declines further, the higher the price of those goods will be, if the exporting country faces problems with wheat as it does today, with India preventing any export of wheat, it will cause the prices of goods to keep rising, and today we can see at certain mamak shops that roti canai is already sold at RM2.70 each. Fortunately today we can still eat roti canai, but if at a shop it is RM2.70, this is a price that is extremely expensive for the people, let alone the B40 group for whom roti canai is a common food for the people of this state. So these matters need to be viewed comprehensively; there needs to be a food security action plan by the Penang State Government, especially in the agriculture portfolio, so that a sustainable and swift action can be outlined and presented in this honourable House, so that we can together overcome the problems that plague the people today. Besides food security, another problem we face today is how we are to develop this state in a balanced way. Today we have achieved very high investment in the state; it is said that foreign investment into this state last year was RM74.4 billion in high-end manufacturing, up to RM76.22 billion. This is a good achievement, but if the digital economy or 5G technology is not developed effectively in this state, then I am worried that the very high investments in this state will have a negative impact on this state in the future. We have witnessed, within the past one or two years, because of the sluggishness or weakness of the Federal Government after the Sheraton move happened, investors have begun to flee. In 2020 alone Malaysia's investment declined to only USD2.5 billion, and we witnessed foreign investors such as Toyota and Hyundai shifting their investments to Indonesia. Toyota has invested RM8.4 billion in Indonesia, Hyundai RM4.02 billion, and this is a major investment in Indonesia, which had for a long time invested in our country, and if we do not play a sufficiently active role to ensure 5G technology is implemented in Penang, I am worried that there will be a negative impact on investment in Penang, which will eventually cause employment problems, and SME employment will be affected, as it has long depended on foreign investors and these big companies. That is why I urge the Penang State Government to make 5G technology a new industry that can catalyse the economy of this country, and I also urge the EXCO on infrastructure to work together, or urge the government to focus on Penang in the 5G market. We are aware that in the 5G market, which falls under the authority of the Federal Government, many other ASEAN countries such as Thailand have implemented 5G comprehensively nationwide. Until now we have no 5G, and even 4G is poor; in Penang there are still areas that do not receive 4G service. Let alone 5G, which has not yet been implemented. Under the Federal Government, it has been given to a government-owned company called DNB (Digital Nasional Berhad) with an injection of RM15 billion. That large injection has still not been implemented until now. This is a matter of great concern because it will affect investment in industry in Penang. So we want the State Government to look at this problem seriously and ensure that when 5G is implemented, it gives more specific focus to the State of Penang. I was also informed in my written reply that 151 locations have been identified for 5G implementation in Penang, with focus given to the island area. It is indeed undeniable that many industries are concentrated on the island compared with Seberang Perai. So I wish to plead once again in this honourable House that as we head towards Penang2030, let the development of the island and also the mainland be equal. I do not want it to become lopsided, which is dangerous; let development be evenly distributed, because the people on the mainland also need, and long for, attention and also care from the Penang State Government. I am not saying that the government chooses favourites, but what I plead for is that the development that is to come be more equitable so that the people of both zones receive the benefits they deserve. So, to move into Phase 2, should it happen, I request the relevant EXCO to ensure that more locations in the Seberang Perai area are identified and also made phases of 5G implementation. This is important so that sustainable development in Penang also involves development in the Seberang Perai area, and we are well aware that the Seberang Perai area has several areas categorised as rural areas, including my constituency of Permatang Pasir. When it is said to be a rural area, development is far too small, whereas the mindset of the residents of Permatang Pasir has risen; their intellectuality has risen, they have become middle class, and of course we in Permatang Pasir expect more development. I record in this honourable House our appreciation to the Penang State Government, which has long helped Permatang Pasir in terms of development, including the Permatang Pasir community hall, flood mitigation projects, sports grounds including futsal and sepak takraw, but it is not sufficient. As the Malays say, "Dapat Betis Nak Peha." But that is not the matter, Deputy Speaker; the question is that we want more development so that the well-being of the people can be protected. So I would like to propose that the government look at the needs of how to develop more public infrastructure in Permatang Pasir, among them the construction of the Permatang Pauh public market to replace the Sama Gagah public market, which is increasingly congested and has long been in a dilapidated condition, and I request that the construction of the new public market be expedited. Secondly, widening Jalan Permatang Pauh, which is very congested; perhaps this is a long-term solution, but for the short term, I request that there be cooperation between the government and the traffic police to ensure that a flexible period is established for heavy vehicles, lorries, passing through Jalan Permatang Pauh, let it be in the morning, so that no heavy vehicles pass through the roads of Permatang Pauh, so that traffic congestion can be controlled.

And thirdly, the Permatang Rawa flood mitigation project should be expedited so that the flood problem in Permatang Rawa, extending to Tanah Liat, can be overcome immediately. And fourthly, the construction of Tok Elong Secondary School should be expedited because the number of students is now increasing. And fifthly, to develop Affordable Homes (Rumah Mampu Milik) Type A and Type B in Permatang Pasir. Up to now there has not been any such project; I request that we move towards achieving 220,000 Rumah Mampu Milik, and Permatang Pasir has received little attention from the Penang State Government. I would also like to touch on the tourism industry, because tourism is a very important industry for Penang. Penang is rich in attractive places, including historical sites, and I would like to propose that the Penang State Government consider culture and the arts as a branch of attraction for this tourism industry. We have many artistic talents born from Penang, among them the late Tan Sri P. Ramlee, and we also have other artistic talent that is no less great, namely the late Nordin Ahmad. Nordin Ahmad, if Deputy Speaker remembers the very famous pantun in Sri Mersing, I would like to recite it, but Nordin Ahmad's tone is not the same. Kajang Pak Malau, kajang berlipat, Kajang hamba, mengkuang layu, Dagang Pak Malau, dagang bertempat, Dagang hamba, musafir lalu.

Those are among the pantun described in the film Sri Mersing, and Nordin Ahmad is very well known for his poetic language in films. We are now facing a dilemma on how we are to uplift the dignity of the Malay language; a Malay language symposium was held to uplift the dignity of the Malay language, and I think artists of this kind, who have very great talent with poetic language in films, can be made into icons so that our young generation can internalise the Malay language. This is the National Language, and this is the transparent and sincere way to uplift the dignity of the Malay language, not playing with the Malay language to make it a cheap political sentiment to divide the unity of the people. But we, as a state that is very advanced, this intelligent state, should become the leading example of how to uplift the dignity of the Malay language by making ... (interruption).

Celahan.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

As icons for Malay children.

Thank you, Dato' Speaker, thank you, because debating this afternoon has been very challenging, but when Permatang Pasir mentioned Nordin Ahmad and so on, it cheered things up again. It is not only the popular pantun Dagang Pak Malau. Nordin Ahmad's pantun also has another one that is very interesting and meaningful. It goes: Apa ada pada paya, Dalam tidak, tohor pun bukan, Apa ada pada saya, Kaya tidak, mashyur pun bukan.

So I would like to request that it be entered into the Hansard, in the speech of Permatang Pasir. Thank you.

Deputy Speaker of the HouseEN

Permatang Pasir, I know too, Ahmad too, only Syed Ahmad I know.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Thank you, Pantai Jerejak. I have allowed the pantun just now to be part of my debate because it describes an awareness within us: who are we? We who stand in this House are nothing more than bearers of the people's trust for us to fulfil. So, returning to the issue just now, I propose that a Nordin Ahmad gallery be built in Permatang Pasir. Permatang Pasir can be made another tourist attraction in the State of Penang. We already have the Royal Mausoleum of Kedah there, and it can be developed just as we developed Fort Cornwallis. We can also develop the Royal Mausoleum of Kedah, but that would need cooperation from the Kedah State Government, as well as the palace. But what I want to say is that in Permatang Pasir there is this historical structure, this heritage structure, and we also have a people's icon that we can make into a tourist attraction that can further strengthen the tourism industry in this state.

I would also like to touch on sports. We are aware that sport is an activity that can attract young people away from negative activities. Now we are confronted with the drugs problem, which is very gripping. Earlier, the issue of ketum was debated, but unfortunately our neighbouring state wants to export ketum overseas. But in Penang, when we talk about the ketum issue, we also talk about the drugs issue and so on, which is indeed a very serious problem, especially among Malay youth. It is said that nearly 65% of Malay young people are involved with drugs every year, and Penang is among the states with the highest records of this drug activity. If we look at the records from 2013 until 2017 mentioned earlier, Penang recorded the highest number, nearly 19,048 cases. I do not have the latest data, but I hope for a decisive action, an aggressive action, so that Penang no longer becomes a den of drugs in this country. Returning to the sports issue just now, sport can, we are confident that sport can keep these young people away from such negative activities. We have many popular sporting events, but in rural areas and village areas there are also traditional sports games that are played. For example, sepak raga tuju. Sepak raga tuju is a game that involves football and takraw ball, but is played below the ankle. It is an interesting game that really attracts many young people in village areas, and I am confident that if it is popularised and commercialised, it will become one of the activities that can keep these young people away from negative activities. So I propose that these traditional sports be taken up by the State Government as sports or popular sporting events, made into annual sporting events and so on, so that more young people, especially Malay youth out there, get involved in sporting events. And we should not be bound only to the sporting events that are commonly played. Returning to this issue as well, I would like to request the EXCO for Sports to explain whether there was any allocation from the Penang State Government to the State Sports Council from 2018 to 2021, and how much was disbursed if any, especially to sports associations including the weightlifting association. And one more important matter, Mr Speaker, Deputy Speaker, the sport closest to our hearts is football. We went through a very proud year with Penang's football, but it only lasted for one year. Sadly, Penang's football team today has declined just as Manchester United has declined. Apologies if there are Manchester United supporters, but that is the truth. We do not want the team…(interruption).

Y.A.B. Chief Minister: Thank you for comparing Penang with Manchester United, even though whatever happened at Manchester.

Deputy Speaker of the HouseEN

I also support what the Chief Minister said.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

I think if we had enough funds we could become a sponsor of Manchester United.

Deputy Speaker of the House

MU all the way.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Okay, but we need to be a team that is always strong, not just for one season but for many seasons, like Liverpool or Manchester City, "We Never Walk Alone". Okay, so I propose that the State Government, the EXCO for Sports, look into what problems are happening in the Penang football team. Only one sport can unite the people, can attract the interest of young people and can bind unity among us, and I believe there may be certain problems that have occurred. For me, let the Penang football team be managed by professionals, by people or groups who are skilled in football, because they know what a team needs, what a player needs and what strategy is relevant for a game or a competition. So here, let this team and also any football events in Penang be managed professionally by those who are qualified and skilled, and reduce the interference of the government or any party in any sports teams, especially in football. I would also like to touch on Islamic Affairs. We know that the Penang Government has launched a 10-year action plan for Islamic Development in Penang, which is known as Khaira Ummah. I fully support this project, this action plan, and I hope there will be more efforts focused on how to educate young people, these youths, to truly understand the principles and values of Islam. Let us not just shout about Islam but in implementation we cannot carry it out. We do not implement it. We talk about Islam but corruption is still high. We talk about Islam but moral problems are not resolved. We talk about Islam, the drugs problem is getting worse. So let us, rather than just talking about Islam, truly implement it and plant and nurture the values and principles of Islamic ethics in the minds of young people. This is important not only for fostering unity among the people of diverse ethnicities in this state, but also for educating young people who have a high civic consciousness and high moral character, so that they can achieve Penang 2030, which we have founded on the family basis. There is no point in rapid, fast development that is very proud if it is not filled with quality human capital, not only in terms of knowledge and thinking, but also must be filled with those who have high moral character, and this must be played by the Islamic Religious Council or the relevant agencies involved in the Khaira Ummah Project, so that this action plan truly builds quality human capital in generating or driving the development of this beloved state, Dato' Deputy Speaker. Next, I would also like to touch on…(interruption).

Deputy SpeakerEN

Honourable Permatang Pasir, one (1) more minute.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

One more minute. No extra time?

Deputy Speaker

Pasai you dah 45 minutes dah. You tak sedar pun.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

He is subconscious, cannot be aware of it.

Deputy SpeakerEN

It's alright, now I am reminding you.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Thank you. It's alright, I respect the stance of YB Deputy Speaker. I will summarise. I will take the last issue. The others I will skip, for the election campaign. So, touching on…(interruption).

Deputy Speaker

This is part of your campaigning?

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

No, no. Other issue will be part of my campaign. Okay, this debate is for the development of this state, for sustainability, for the state we love. I propose that we also look at the people's pockets. Earlier we talked about food security, the price of goods, that is also the people's pocket. But there are groups who need direct assistance. Those who need protection. So, I propose that under this equitable economy agenda, the per capita assessment of household income be raised from RM260 to RM300. Because today, people's income is uncertain. Some have been laid off. Some have had their salaries cut. And at the same time, the price of goods has soared. A gap, or a very significant gap, has occurred between income and the price of goods, which causes the cost of living to rise and consequently inflation will rise. So, the per capita assessment in evaluating household income should be raised from RM250 to RM300. I suggest that, to uplift more of our people out there, then Malays in rural areas receive assistance under this AES with even more people, and I also request that rural development be activated and also enhanced.

My constituency is in a rural area. I believe that under this rural development portfolio, there is an allocation for building new houses or repairing houses. I request that projects of this kind be enhanced so that more people out there who are struggling and need protection in terms of housing comfort can be given attention, especially in the Permatang Pasir area. As the ADUN for Permatang Pasir, we have two (2) allocations, one allocation, Deputy Speaker, one allocation P02, one allocation P03. Previously, part of my P02 allocation was used to repair houses, but I am informed that recently, P02 can no longer be used to repair individual houses. P02 can only be used for public allocations, for general use such as roads or drains, but not for repairing individual houses. Yet these people, who are poor, these asnaf, who have dilapidated houses, nearly collapsing, are also public, they are members of the public, they are the people. The people are the general public. So I request the government to review the circular that does not allow P02 to be used to repair dilapidated houses, and I also request the Rural Development MMK (State Government Executive Council) to provide more facilities for this project and reduce bureaucratic problems if any exist. Do not look only at certain areas. Sorry, I have to say it, only Penanti is mentioned as a rural area. Yet Permatang Pasir is also categorised as a rural area. So, I request that this matter be looked at seriously by the Penang State Government, and finally I appeal to the Honourable Chief Minister, whom we cherish, to increase the P02 and also P03 allocations. What is wrong with increasing them by RM100,000 for each allocation? I think all ADUNs will agree, because as ADUNs we need a large allocation so that we can provide direct service, direct service to the people. So, the delivery of services can be enjoyed by the people more closely and also more quickly. And finally I want to say, this is really the last…(interruption).

Deputy Speaker of the HouseEN

Three (3) times already, if I am not mistaken.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

If it is three (3) times, then it really is. I request that, previously we had free bus services, and these free buses were mostly used by foreign workers. I think that is not right. Although foreign nationals also have a right under the law, or a right to receive services in this country, or in this state, but in my view the service should be more beneficial to our own people. So, I request a free bus service for poor school students. In my constituency there are many cases where students do not go to school because there is no vehicle to pick them up and drop them off. Some schools have had to hold collections to provide free buses. So I request that this free bus service be re-evaluated to provide a specific service for the programme of picking up and dropping off these poor and struggling children, these B40 group, so that they can go to school and receive a complete education like other people's children.

I thank the Deputy Speaker for giving me sufficient time, and I also thank the Penang State Government for providing the best service. That concludes my speech, thank you. I beg to support.

Deputy SpeakerEN

Thank you, Permatang Pasir. Honourable Members, the debate session is now concluded, and the House will take a break and resume with the winding-up session at 3.00 p.m.

The House was adjourned at 2.40 p.m.

The House resumed at 3.10 p.m.

Secretary of the HouseEN

Honourable Members, Yang Berhormat Deputy Speaker of the State Legislative Assembly.

Deputy Speaker of the HouseEN

Honourable Members, we move to the winding-up session. Penanti is invited to the floor. If you have a stomach ache, let me know, I can give more break, no worry okay Penanti. We give you 1 hour, no injured 10, no extra 10, okay.

Okay, Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and good afternoon, colleagues. Honourable Dato' Yang di-Pertua of the Penang State Legislative Assembly, Honourable Members of the State Executive Council (MMK) and Members of the State Legislative Assembly. Heads of Government Departments, especially under the MMK portfolio of Agrotechnology and Food Security, Health and Rural Development. Ladies and gentlemen, my respected guests. Honourable Deputy Speaker and Honourable Members. I extend my highest appreciation to this esteemed House for giving me the opportunity to present my winding-up speech to answer supplementary questions related to issues under the portfolio entrusted to me. In answer to the question from the State Assemblyman (ADUN) for Seberang Jaya: the decline in the self-sufficiency rate (SSL) for chicken in 2019 by 140.86 per cent to 2021, 111.27 per cent was due to the decline in the number of livestock farms, especially for broiler chickens, from 125 farms in 2019 to 120 farms in 2021. With a reduction in livestock population of 961,390 chickens. The following is the total output value in Ringgit Malaysia and the self-sufficiency rate or SSL for meat, chicken and duck for the years 2019 and 2021. Production in metric tonnes went from 95,742.65 in 2019 to (79,755.13 metric tonnes) in 2020 and to (76,553.94 metric tonnes) in 2021, and the output value from 2019 was 650.71 million, to 575.05 million in 2020, and in 2021 it was 783.54 million. This means the output value in terms of Ringgit Malaysia has increased. Only the production in metric tonnes decreased, and also the SSL from 140.86 to 113.27.

There was a decline in production in the previous year, 2020, of 3,201.19 metric tonnes in line with the decline in the chicken livestock population. Egg production from chickens or ducks in the State of Penang in 2021 was 193 million (983,700 pieces) with a self-sufficiency rate of 42.61, this is for chicken and duck egg production. The insignificant decline of 0.2% in the self-sufficiency rate, and in chicken or duck egg production, is in line with the increase in population in this state. There was an overall increase in the number of chicken and duck breeders, but it only involved a small number of livestock compared with the overall chicken population, which continues to decline from year to year.

The reduction of nearly one (1) million broiler chickens has had a major impact on production because of the short production cycle of broiler chickens and their higher output, 5.5 to 6 times a year, compared with the contribution of kampung chickens or laying hens and spent hens.

Okay, I will not read the details, but the COVID-19 pandemic directly impacted the decline in livestock population, especially broiler chickens, because of constraints on demand as food outlets were not allowed to operate dine-in, and a shortage of manpower, which ultimately forced livestock populations to be reduced in order to ensure management could be carried out better.

Besides that, factors such as disease outbreaks caused breeders to reduce the next cycle's population in order to reduce the risk of chicken deaths. The increase in population from year to year has led to an increase in demand, which ultimately affects the self-sufficiency rate (SSL), whereas production continues to decline.

I will discuss the issue of rising chicken prices for the supply of chicken meat. Our country is experiencing a situation of sudden rises in chicken prices and a reduction in the supply of chicken in the market. The Penang State Government takes this situation very seriously because it affects the people, since chicken and eggs are among the staple foods of the people of Penang and Malaysia.

This sudden price increase is a result of the COVID pandemic, which has dragged on for more than two (2) years, coupled with the Ukraine-Russia war, which caused increases in the prices of the main ingredients in chicken feed formulation, namely maize and soya, because these ingredients are imported from abroad. Both of these factors have directly affected chicken breeders, who bear the increase in chicken production costs as a result of higher livestock feed costs. I will give a bit more detail in terms of the increase in livestock feed prices for the main commodities.

Okay, for chickens or poultry. The price before COVID for starter feed, the livestock feed, yes, the price before COVID was RM112.00. In February 2021 the price rose to RM120.00 for one bag of livestock feed of 50kg. The price in June 2021 was RM131.00 per 50kg bag and the price in May 2022 was RM152.00. This means the increase in price compared with before is RM40.00, which is a 35.7% increase in price. For chicken grower feed, the price of 50kg livestock feed bag was RM110.00, the February price was RM118.00, the June 2021 price was RM129.00. The price in May 2022 was RM150.00, an increase of RM40.00 compared with the price before COVID, which is a 36.4% increase.

For the price of feed for large ruminants such as cattle and buffalo. For Grade A, the price before COVID was RM40.00, the February 2021 price was RM46.00, the June 2021 price was RM54.00, the May price was RM71.00 in May 2022, which means the increase in the price of livestock feed is RM31.00 or 77.5%. For Grade C, the price before COVID was RM28.00 and the increase in price in May 2022 was RM58.50, the increase in price is RM30.50, an increase of 109%.

For goats, small ruminants, for Grade A the price before COVID was RM43.00, in May 2022 RM65.50, price increase RM22.50, an increase of 52.03%, this is roughly the increase of one bag, and for Grade C it rose from RM34.00 before COVID to RM56.50, a price increase of RM22.50, which is 66.01%.

Okay, so, because of the price increases I mentioned earlier, to overcome the increasingly critical shortage of livestock feed, the State Government of Penang is prepared to consider applications for Temporary Occupation Licences (TOL) for the purpose of growing grain if there is demand. A statement issued by the Chief Minister, the Most Honourable Tuan Chow Kon Yeow, on 24 May 2022 said that although Penang is a small state in terms of land area, agricultural and livestock activities are greatly encouraged in this state.

At the same time, the Penang Department of Agriculture proposed that if TOL land is given to farmers to produce livestock feed, it is appropriate for the State Government to reduce land tax if the land has development status. There is also a lot of development land in Penang where projects have not proceeded, so these lands are requested to be used temporarily to produce livestock feed. For example, the import price of maize for livestock feed is expected to rise. Previously, before COVID, it was RM800.00 per metric tonne, but now it is about RM1,800.00 or RM2,000.00 per metric tonne and is expected to rise to as high as RM3,000.00 per metric tonne because Russia supplies 25% of the maize supply for animal feed, which is still...

Okay, so far the price of maize for animal feed has reached RM1,800.00 to RM2,000.00 per metric tonne, and growing maize in Penang can be carried out, but it is not suitable because the weather has high humidity, which will result in low crop yields, and growing maize will also not reduce the problem of high production costs because maize for livestock feed must be dried, otherwise it will become mouldy. So, maize that we eat as humans doesn't have to be dried, so that is one factor mentioned by the breeders' associations. So the proposal put forward by the small breeders' association and also the Malaysian Chicken Breeders' Association, and other livestock breeders and also in Penang, they have proposed the use of broken rice, which can replace maize, as well as broken rice and also rice bran. Rice bran means the bran from rice mills, which has the polish rice, the white one, so, the powder that is yellow, that is a source of substitute for maize which is very, very bitter, called rice ground or polish rice. So, there is broken rice, and when I also visited the Permatang Nibong Cooperative, where the Department of Agriculture had provided a machine, a paddy machine that can be used simultaneously to extract rice but can also extract broken rice, and I asked what this broken rice is used for, they said for animal feed. So, that means we in Malaysia, we have, we already have many paddy fields, so we can have a solution to the problem we are facing now, we use broken rice or polish rice or rice bran.

So the State Government will help in assisting breeders to obtain broken rice prices, for the use of livestock feed, these breeders should be encouraged, only...(interruption).

Deputy Speaker of the HouseEN

Penanti. Permatang Pasir, please come in and ask your question.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Interjecting, one relevant question.

A question? Can you wait a bit until my turn?

Deputy Speaker of the HouseEN

It's alright, we will understand later.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Later I will apply for an extension of time.

Okey.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Okay, one question, YB. EXCO.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Earlier YB. explained the need for broken rice to replace maize...(interruption).

And also rice bran.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Rice bran. We have quite large, although limited, paddy land in the Central Seberang Perai area. Does the Penang State Government under the YB.'s portfolio intend to implement this broken rice project, the cultivation of broken rice paddy in Penang? Just as when Pakatan Harapan administered at federal level before, we carried out a project of glutinous rice cultivation, rice planting to produce glutinous rice in Langkawi. So, will there be such a plan for broken rice in the State of Penang? Thank you.

Apa yang…(gangguan).

Deputy Speaker of the House

Permatang pasir I were add on to what she talking about beras hancur is the tip of the rice. Which is use and you will gran the tip of the rice and will become rice bran that’s all.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Yes, yes. Will there be?

Deputy Speaker of the House

That’s no rip for beras hancur okay. Thank you.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Is there a plan or not, I mean a plan.

Actually, broken rice and this polish rice is a by-product, so when we, millers or now cooperatives, for example, we give them a machine, they make their own beautiful rice, we eat the beautiful rice, the ones that are not beautiful, you know, like when we polish the rice, there is the yellowish one, the bran, that is used as animal feed. That means we don't need to plant paddy again, we can use the 12,000 hectares we have now, the production is only the rice that we usually see, which may not have value, but now it is very, very important that it can be used as a substitute for maize.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

My question is, sorry, because we have plans, whether if we want to increase paddy yield, producing good rice, we will focus on that plan, that's what I mean. Will there be a government plan specifically for this project?

So far, I mean, I can discuss, we can discuss, yes, with, like we have 942 hectares included in the large-scale Smart Sawah, and also the other smaller ones, we can discuss with them, that means a method where we gather, we make one, we create a new programme, that means broken rice or polish rice brand for livestock feed. Now they have already done it, only perhaps the Federal Government may not have noticed that, but indeed now, when we go to that machine, when the machine is running, the people there, it does produce broken rice, it's all there, it has indeed been used...(interruption).

I'd like some clarification, first, the SSL, we see that chicken is indeed exceeding, still exceeding, so if possible we maintain it and increase it. Only the issues that arise are disease, COVID and also the issue of food ingredients, which is the most important food ingredients, so I feel the State Government needs to look at this issue. First, we have basic ingredients that we do not need to import except rice...(interruption).

Actually, in my debate, I had all the solutions...(interruption).

So we ask the State Government to please discuss (interruption) discuss with BERNAS and private mills, so that if we don't control it, they will use, they will polish to make better-quality blends and so on, so we lose out on livestock feed.

Yes, exactly, that is why I feel in my winding-up speech this should be minuted, so I, because I also sit in the Food Security Council at national level, and before this, in all meetings, we have indeed discussed the problem of rising costs and livestock feed prices, but nobody gave a solution. Everything, when we discuss with the Federal Government in the Food Security Council, they will say okay, subsidies, and we in Penang also have subsidies that we provide, I have the figures, it's more than RM4 million for breeders, and only, only thinking in terms of soft loans from Agrobank and also subsidies. But recently, when I discussed, when I knew there was a food security motion, I had already called all parties, the small breeders and the Breeders' Associations and also the big big players, is there any substitute solution that can replace maize and soya, and indeed there was. So, only at Federal Government level, when we sit in those meetings, they did not discuss that, they discussed solutions, which are only subsidies and soft loans. This is the first time that we in Penang, when we meet all parties, we know there is a solution, and I will continue...(interruption).

I think we in Penang do it that way, YB...(interruption).

Actually, we have yet other solutions...(interruption).

In this state too we ensure rice, we call BERNAS, we call all the private mills, we do it. PKC too we do, so the food can be obtained cheaply. Our factories here, the food factories...(interruption).

Yes, it's the same with CPO, so the breeders say the CPO used to make feed now costs RM7,500.00, so they request that if the Federal Government can help reduce it to RM3,500.00. Another thing is that they need PKE and PKC, so now these materials are exported to make livestock feed for other countries. So they also request that the Federal Government help ensure PKC and PKE are also made available domestically.

YB., we decide like that, we discuss other matters, we discuss food matters, we have to do that.

Another way that the Breeders' Association has proposed to us is to make the cost of feed one of the main concerns. However, the problems faced are the shortage of workers and the fact that Penang has no place for cold storage and a chicken slaughtering centre. The Breeders' Association has therefore applied to the State Government for seven (7) acres to be developed into a closed farm, not a closed room, along with a slaughterhouse for the chickens. When we have chickens, because we are more SSL, when we are not facing serious problems, we can store them in cold storage, so that food can be stabilised and there is food security for the people of Penang. That is what was proposed. I have discussed with the Director of Agriculture and also with CMI that the land at Agro Park Juru, CMI land there, has a livestock zone, but that livestock zone is now full. However, through discussion with the Director of Agriculture, we can use land whose productivity may not be very good. Use that land, seven (7) acres, for the Breeders' Association so that we can call it a stock piling of chickens, so that we can stabilise prices, the price of chicken. And now at Valdor, we already have breeders' associations that run closed farms in multiple tiers, just like pig farming. We can go for closed pig farms, where they increase numbers a lot: the young below, the mother above. So for chickens too, we have the Poultry Enactment. Under the Poultry Enactment in Penang, breeders who follow the regulations we passed this year, if they rear more than 20,000 chickens or poultry, must set up a closed farm. We have given them until 2024 to implement closed farms, just as for pig farming. Earlier there was the problem of flies, all of that, at SPS. With closed farms, the meaning of the Enactment is that it requires closed farms and also zero discharge. So the fly problem we face now, Insya-Allah, will be resolved after this. But we will only enforce it in 2024. We have given two (2) years for chicken breeders with more than 20 thousand chickens, poultry or ducks, to implement closed farms. But even now there are Breeders' Associations with three-tier and four-tier closed farms for kampung chickens. This means the chicken supply can be stockpiled. We can stockpile for six (6) months or nine (9) months on the seven (7) acres of land, as long as the cold storage has sufficient capacity. We have also found that in the island area there is also a chicken slaughterhouse under MBPP, which the Breeders' Association wishes to apply to build a slaughterhouse and cold storage in the island area, namely in the Batu Lancang state constituency…(interruption).

Penanti, we have NAFAS farms, a NAFAS site beside the highway with fairly large cold storage. Have you discussed with NAFAS using it for stock there?

Okay, so far I have been in regular contact with NAFAS, but they have never told me about this.

They have a factory beside that highway. I think we can discuss it again.

Because I often discuss with NAFAS about rice seeds. If the farmers always ask and it does not arrive, then when I ask them, they should give it to the farmers. Okay, regarding the ceiling price of CPO, CPO is needed, 3 to 5% is used for livestock feed production, so that is why they request that the current price be lowered if possible to 3,500 per metric tonne, because currently the export price is higher than the domestic price. But because of the importance of CPO, we have many oil palm estates, but if everything is exported, it is a pity for us. So they request the Federal Government to give priority to domestic needs to help the problem of feed costs for animals, and they also ask for PKC and PKE and a ceiling price for the selling price in local markets. Okay, for small breeders, small fish breeders, kampung chicken breeders, all of them also have very good proposals actually. Now, the cost of animal feed is high. If we discuss with the veterinarian, they say it affects large chicken breeders a lot, but because village people can find other substitutes, for example petai belalang. Petai belalang is plentiful, for example in the hills, easy to find, and it is a good source of protein that can replace soya meal. Another one, kacang kelisa, also has high protein content. Burma has long used a substitute for wheat because its protein is nearly equal to wheat. Okay, if it is used in making feed pellets for animals, besides reducing dependence on wheat, it will definitely create new opportunities for farmers to establish kacang kelisa farms to supply the production of food pellets. Energy and fibre can also be obtained from cassava, cassava leaves and dried papaya leaves, which are also the best substitutes for protein and fibre for livestock feed production. Another thing we can do, this is a win-win, two strategies that can solve two problems, is black soldier fly, or BSF, the use of natural black soldier fly by small breeders, produced through natural methods from natural sources and environments, not through enclosure or cage methods. That means many small breeders have natural black soldier fly.

This BSF is produced after the necessary media are prepared for BSF parents to lay eggs, such as discarded vegetables and boiled residues of processed fish. So the BSF larvae produced are more nutritious and organic, and BSF can supply almost 100% protein. The price of BSF larvae now reaches RM40 to RM50 per kg, and is used by many factories making animal feed pellets, so for small breeders they can even make it themselves. Food for BSF is discarded vegetables, waste from the processing of boiled fish products, discarded fruit or rotten fruit. In other words, the food source for BSF uses only the system of food and fruit and vegetable waste…(interruption).

Deputy Speaker of the HouseEN

Honourable Penanti.

How many minutes is it already?

Deputy Speaker of the HouseEN

30 minutes, only questions so far. You still have health, and ….(interruption).

But I want to focus on the issue of how to solve our problem, because our chicken industry is actually the largest in Malaysia.

Deputy Speaker of the House

You are giving information how to improve the feed of animals…(gangguan).

It's not improving, to find a solution especially for the small… because prices, as I mentioned earlier, have indeed risen, the one I mentioned, feed at RM50 per kilogram. So we recommend that a special place or animal feed hub be established to process and produce feed or animal feed pellets using natural resources, or the abundant natural sources in our states. Okay, for commercial purposes, we see that several states and Singapore, especially, have already done BSF commercially, the one just mentioned for small breeders. If we look at BSF protein meal, it can substitute 5 to 50% fish meal, for example, for our aquaculture industry in Penang, which is the largest in Malaysia. That means protein from BSF larvae can be used to replace 5 to 50% fish meal feed for shrimp and fish, and also 100% soybean meal for chicken feed without affecting the growth of the chickens. For eggs, laying hens can help with 7.5% in terms of their diet, and for broiler diet 10 to 16%. So, where will we get it if we want to do it commercially? If we look at Penang, we have plenty of waste from restaurants, hotels and markets. Another thing, we have wastewater sludges, from places like dairies. Another thing, Penang is among the largest manufacturers in Malaysia in terms of food processing and also oil pump refinery. So we can obtain from the outflow of water, from Depomycade, from the oil pump refinery, and also waste from MBSP or MBPP, that is from markets and hypermarkets, which instead of being thrown away, can be used to feed these black soldier fly larvae. Another thing is also the sugar processing industry in Penang. We can use wastewater sludges, RBD waste product, as a food source for black soldier fly. We also have FMB and the food manufacturing industry in Penang, and also trimming. When people sell things at shops, they have already cut them up. So, trimmings can be used for BSF food and also for aquaculture. We have fish cages. Our fish cages in Penang are the largest. Whenever I meet the fish cage associations, they have problems. Where do they dispose of their dead fish? I went to look at the fish cages and there are big fish up to 40 kg. So, what is their problem with disposal? You don't need to dispose of it, give it as, these people have nowhere to dispose of dead fish carcasses, so we can invite these commercial companies, like what Temasek in Singapore did in Johor. We can invite them to take that fish, shrimp, chicken that has died and use it to feed the black soldier fly. For example, in Penang we can actually produce 500 tonnes per day, as in Negeri Sembilan. Their food source is not that large, but they can produce black soldier fly at 300 tonnes per day. So, Penang has more sources actually. Because if we use waste from food-grade industry, factories that are food-grade, those factories certainly make food. So if we use that waste to feed black soldier fly, it is for protein. Then, that means we do not need to worry about chemicals or toxic waste, for example. So, 500 tonnes per day, for example, of organic waste from our stock can produce 10 tonnes per day of BSF oil. Okay, actually, doing this is not very expensive, because many companies use their own funds. We may only need to form a JV between the state and companies that do what Temasek did in Johor and also in the US. The problem faced now is that BSF is considered a small industry made by small breeders. But if we want to do it commercially, as in Negeri Sembilan and Johor, then the Federal Government needs to recognise this BSF. The larvae are a source of protein for chickens and fish and various others. If we look back at villages in the past, kampung chickens used to eat earthworms in the ground. It is the same, that means they eat fly larvae. It becomes a source of protein. So, we have no problem if we can do this with waste. We can solve the problem of what is thrown into rivers. If not, that waste is dumped into rivers. For pig breeders, for example, they can reuse waste from pig farming and use it for pig feed itself. Feed for black soldier fly, and use those larvae to feed protein to pigs…(interruption).

I think Honourable Penanti. We already know the solution to the feed problem: broken rice, PKC, and also the new proposal from the Honourable Member earlier. I think we do not need to go on at length about this. We need to do something next, we must build a factory for BSF, or discuss with BERNAS, factories to limit the production and sales of broken rice so that it is fully used for food. For PKC too, we discuss with factories not to export everything. We need 50:50. 50 for food and livestock, 50 for export. If everything is exported, it's finished. So let's stop at that point. We can settle other topics, I'm afraid we won't have time for them.

Yes, that's right, but as mentioned earlier, rice is a substitute for maize, but soya meal is protein. So we need, like BSF and kacang kelisa, all of them as sources of protein. But what I want to say is that efforts to use BSF, we have actually tried it for several years. Only USM has actually done it. And I have also proposed this to the State Government at no cost to the State Government. I think at that time, MBSP was very focused on tipping fees. They wanted a tipping fee of only RM10. So, as I said earlier, we do not need to rely on attracting BSF companies to come to Penang just for solid waste. We, that is, if there is a BSF plan like the one we planned earlier, then rubbish does not need to be sent to Pulau Burung. If organic rubbish does not go to Pulau Burung, then there would be no fire at Pulau Burung, because at Pulau Burung, organic waste turns into dangerous gases. That is what causes it to burn. So, what I want to say here is that this organic waste comes from factories in Penang. Food-grade factories, which there are already many of in Penang, and also this municipal waste can be used to create a BSF industry, like what Singapore has done, and also other countries and also Negeri Sembilan.

Deputy Speaker of the HouseEN

You've already mentioned Singapore three times.

Okay, noted. I want to change the topic to rice now, because just now I wanted to answer the question about rice…(interruption).

Ong Ah TeongDAP · PHBatu LancangEN

Mr Speaker, I am still waiting for my answer about aquaculture, from my debate just now. What is the option?

I have an answer for what, the fish cages? Is it a question about that?

Ong Ah TeongDAP · PHBatu LancangEN

No, my question during the debate was about climate issues, climate change, and fishermen's issues. How can we help fishermen with climate change? One. Second, about cooperation with three (3) renowned research institutes. All three institutes are in Penang, such as WorldFish, FRI, all of them are in Penang. Is the Honourable EXCO member collaborating with them?

Yes, I want to answer, but I thought there would still be a while yet, after the padi, but let me answer first since everyone has already asked. I have the answer, yes. Okay, the cost of living, if we look at

aquaculture fish or cage fish. If we look at Penang Island, there is a big market for them. For example, for cage fish, the market is largely in Hong Kong. So, when the pandemic happened, people in Hong Kong found it difficult to come because of the MCO, so they experienced problems at that time. They could not sell. Because these cage fish, the cost is in the cage, and when there is a storm or disease they die, and sometimes it happens, and we have already looked for solutions to this issue. Before I go to those solutions, I want to talk about rakyat fish. When we speak about rakyat fish, we are talking about pelagic fish. We are talking about two types of fish in the sea, demersal and pelagic fish. Pelagic fish, we cannot put them in cages. They go around Penang Island, they go from Perak and then they go around like that. So, here, what we did during the MCO in 2020, many fishermen were arrested. So they could not go and catch fish because they had no licence. This is because licences in Penang have been frozen since 1982. Alhamdulillah, I have applied to the MAFI Minister, and MAFI has given Penang 535 new licences for fishermen called special sampan licences. So, this helps, and we also, the Penang State Government, for example, recently approved the land committee for the TOL allocation to the fishermen's unit at Taman Ilmu in Sungai Acheh. So, what I raised in the EXCO meeting and also in our Penang Economic Recovery Council meeting is that although Penang is the largest producer of cage fish and aquaculture, if we look, these fish are mostly in restaurants or exported as fillets. I have gone into the fillet factories. Siakap fish are exported to Australia, for example, and we are also the largest tuna producer in Penang, but there is no downstream activity. Because of that, for example, we have approved the building of a tuna product hub for IAT entrepreneurs. That means we have tuna boats, but they go to Penang Port and then straight away export to Australia. There is no value-added activity here. So, for example, we have just approved at Batu Musang Jetty a tuna product hub for entrepreneurs who make tuna products. Another proposal we have received is for the construction of an international fishery terminal, not in the sea, but the latest is near Bagan, near Telok Air Tawar, in that restent area, so that an international fishery terminal with space, let us say for 300 fish processing factories, and also cold storage, is set up there, and also for options. That means the tuna industry, instead of having no downstream industry at all in Penang, we create this industry, but more on the processing, options market, sales and so on. We have already got that...(interruption).

So, Penanti, the jetty at Bagan Ajam will be developed?

Not that jetty. That jetty is near that area.

Near that open area?

That means near the restent, I think there are 1,200 acres or so, right? The latest discussion we had, the final agreement, is to set up an international fishery terminal on land so that we do not disturb the sea.

I ask the Honourable Member to look at that area, which is already large, filled to be used as a jetty site first. It is indeed large. It is better to take that area as it is more suitable.

Actually, we have already worked with the fishermen's associations, because the fishermen do not want big tuna boats like these to disturb fishing activities. So the final decision taken is that the international fishery terminal be built on land, in that area. Another effort we are making on land in that area. Another effort we are making to diversify fishermen's income, as I said earlier, without fishermen, no one will go to sea to catch fish. Pelagic fish and diamond fish are cheap fish that the people of Penang can afford, compared with cage fish or fish in aquaculture ponds, because the cost is higher. So, apart from the TOL allocation, we also want to develop several jetties now. For example, if just now in SPU, such as the Kuala Muda area, we want to make a beautiful development that is good for increasing fishermen's income, and also at Robina Beach, the State Government has allocated, the State Government has built Robina Eco Park to help the dried fish sales centre, to help fishermen increase their income, at a cost of RM1.46 million. The start date of work was 15 October 2019, the completion date 30 March 2020, and it has two phases. The second phase involves a cost of RM2 million, and the start date of work was 9 August 2021, with completion on 11 March 2020. There is a market complex there, and various things have been done. So, we, we want our fishermen, because we, we are surrounded by the sea. So without fishermen who want to go to sea, it is very difficult. So a new effort we are carrying out together with FRI. We have the Fisheries Research Institute at Batu Maung, which is the largest in Malaysia. So together with FRI, since last year, we have allocated RM1.5 million to FRI to carry out an oceanography study and biometric study to see where the fish routes are, where the shellfish routes are, and where we should move fish cages that are damaged by storms and are not ruined. So we have started a new cockle farm project involving giving new TOL to 104 participants, 103 of whom are fishermen and only one of whom is not a fisherman, a woman. So we have created this cockle farm, one lot of cockle farm is 21 hectares, and in one lot, eight (8) participants do it together, so for each participant we give TOL. Another project we are doing is rearranging the existing cockle sites in SPT and also in SPS. So the cockle sites there, altogether, I think there are about 81, all together, about 13 lots at the new SPU cockle farm, and the rest are existing. Previously, these cockle lots were such that fishermen, or cockle farmers, simply applied to the State Government, through the District Office, simply filled in the form to request cockle lot TOL. Then they arranged them themselves, the same as fish cages. What we have now done, through the oceanographic study, we have data showing where we should make the lot, so we make the lot like a parking lot. We create the lot, and we meet existing farmers and show them the data we have, and the data show that they can...

multiply the productivity of cockle production. That means we place cockles slightly away from the beach, because cockles are creatures that will eat everything. So if they are at the river mouth, the cockles will absorb all the pollution coming from the river mouth, and it will also be difficult for JPS to clean the river because all the cockle farmers' lots are there. So what we have done together with the Department of Fisheries, the Department of Fisheries in Putrajaya is also involved in these projects, and also FRI. Especially, I want to salute Doctor Hazli and the team at FRI Batu Maung, and we discussed with existing farmers and rearranged them. So previously, sometimes the lots were across each other, and we have also opened new lots in SPS to add income for fishermen and the B40 group. That is the process we have carried out, and these farmers will also be taken to Perak, where this project has been running very well, and we expect that each person can get at least RM10,000 a month in the new cockle farm. But if we look at the mathematics, Insya-Allah, we pray that it will provide additional income for fishermen. That means fishermen must still catch fish, but they also become cockle farmers, having their own TOL. And we are also building two (2) new cockle landing jetties worth RM1.4 million, built by JPS at Sungai Abdul Jetty and also at Lahar Endin Jetty for the new cockle farm. For the existing cockle farms, the State Government has added funds to LKIM to upgrade Sungai Belanak Jetty...(interruption).

Deputy Speaker of the HouseEN

Honourable Penanti.

Deputy Speaker of the HouseEN

Three more minutes.

Tiga minit.

Deputy Speaker of the HouseEN

Yes, the time given is one hour.

Okey.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Yang Di-Pertua.

Deputy Speaker of the House

Batu Lancang.

Ong Ah TeongDAP · PHBatu LancangEN

Not answered yet.

Wait. I am answering that. About the fishermen.

Ong Ah TeongDAP · PHBatu LancangEN

My question about climate change?

Yes, climate change. Okay.

Ong Ah TeongDAP · PHBatu LancangEN

How do we protect fishermen from catching their fish because of climate change? The sea is getting hotter and the fish will go to deeper and colder sea.

Now, just a moment, I have only two minutes. For cage fish farmers in Sungai Udang...(interruption).

Ong Ah TeongDAP · PHBatu LancangEN

No, I said fishermen, my question was about fishermen.

Yes, what I said earlier was all for fishermen.

Ong Ah TeongDAP · PHBatu LancangEN

No, I mean climate change will affect fishermen's income.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Talk aside, talk aside.

Ong Ah TeongDAP · PHBatu LancangEN

Just bind it aside.

No, not now, as I said. We are trying to give what the fishermen...(interruption).

Deputy Speaker of the HouseEN

Batu Lancang, sit down, you can answer later.

Okay, we also have the marine hub that we have gazetted, so that the marine hub that is being gazetted ensures that fish stocks are available. That is one effort. Another is for the cage fish farmers of Sungai Udang. We have several large cage fish farmers at Pulau Jerejak and also at Sungai Udang, and what we are doing at Sungai Udang now is that we have projects like the cockle farm, where we are trying a pilot to move the shrimp cages that were previously affected by pollution, and that area is shallower and full of mud and not well arranged, to the middle sandbank, that is between Pulau Aman and Pulau Gedung. There the sea is deeper and has proper flushing. That means the Sungai Udang Cage Fish Farmers Association will make two types of cages. One is the HDPE pole circle cage, and the other is existing cages moved about 5 kilometres from the existing area to there, because we want to save our cage fish industry. But, as I said earlier, for the fishermen we have also given to those who are poor, we have given new boats to them, and also to encourage development, for example in Kuala Muda, and also giving TOL, trying to give TOL to fishermen, as I gave the example of the Taman Ilmu Fishermen Unit and other places. Another very important effort is that we are upgrading jetties, for example at Changkat for agro-tourism, and I want to give the efforts we are doing, for example, to diversify income, because studies show that when young people bring fishing trips, they bring RM300 and get income of RM350 per trip, so the study has details in terms of how much income is generated by these young people. That means their income is not only from catching fish, but we want fishermen to remain fishermen, not we want fishermen to become factory workers or anything like that...(interruption).

YB.?

Deputy Speaker of the HouseEN

Thank you, Penanti.

Wait.

Before Penanti finishes.

Deputy Speaker of the House

Yang Berhormat…(gangguan).

I want to finish. Wait. Just a moment.

Not touched yet...(interruption).

Two minutes please, two minutes because there was an interruption just now...(interruption). .

Deputy Speaker of the HouseEN

Honourable Members, if you want answers to the questions raised, you can go directly to the office of the Penanti State Assemblyman (ADUN).

Before I end, because there was an interruption just now, I want to say something.

Deputy Speaker of the HouseEN

I gave two minutes for the earlier interruption.

Okay. We have 64 acres of Relau. 10 minutes from the airport, what we are doing now is a competition to rebuild the Relau agricultural station. We are holding this competition with a prize of RM30,000, open to everyone to get a master plan competition...(interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Honourable Member, this competition is good, but it does not address the food security issue that many are discussing these days...(interruption).

Now, we have the Relau agricultural station that has been there since the 1970s, and that land is prime land. We want that when people come to Penang, they can showcase Penang there as the Silicon Valley of high-tech aquaculture, that is why we want to do it there...(interruption).

Thank you, thank you. That is for tourism, Honourable Member. We asked about the food security issue...(interruption).

This is not just pelancongan....(gangguan).

Deputy Speaker of the House

Diminta seorang at the time.

Not just for tourism, that is why we ask for ideas from everyone from...(interruption).

Deputy Speaker of the HouseEN

Sit down. Ha, Sungai Dua. Question from Sungai Dua. Okay, we will entertain up to three more minutes.

That is what I ask the Honourable Member to help with.

I have not finished yet...(interruption).

That is what I ask the Honourable Member to take this as a reminder to answer me, maybe not answering at this time. One about what I raised about Agro Fest...(interruption).

I want to answer this now...(interruption).

The time is over...(interruption).

No, just one minute. Agro Fest, we do have an allocation for Agro Fest. There is no issue there.

Deputy Speaker of the HouseEN

Okay, see, the answer has been received. This year there is Agro Fest.

Let me speak first. Apart from Agro Fest, we also hold the Penang International Padi Festival because we want to recognise how important padi farmers are, and this time around we have a competition for padi straw art, open to the whole public, with a prize of RM30,000...(interruption).

Deputy Speaker of the HouseEN

Okay, Permatang Pasir, I will give you a chance to ask a question, that's fine.

So that the padi straws .....(interruption)

Deputy Speaker of the HouseEN

You have finished your question. Sungai Dua, sit down.

Just one. Member for Permatang Pasir, Honourable Muhammad Faiz bin Fadzil):

I want to say something. I hold the padi festival in high esteem, but I see this is more about the tourism factor.

Tidak, bukan.

Okay, what is the significant result of this padi festival in solving the food security problem in Penang?

Okay, first, Kampung Terus, nobody knew. Its padi yield was very low. After the padi festival we held, its yield is now the highest in Central Seberang Perai.

Deputy Speaker of the House

That cover the food security. Permatang Pasir.

Yes. That means increasing income.

Deputy Speaker of the HouseEN

Paddy income increase, rice income increase. We get better rice now. Food security.

Yes. We put in the latest technology, and in the padi fields we have fertigation projects that our village children developed, IoT more sophisticated than Vitra...(interruption)..so I am saying the padi festival is not for nothing..(interruption).

Deputy Speaker of the House

Okey, Yang Berhormat Penanti, duduk sat. what she was telling all this while is how to increase the production of fish, beef, pig, chicken everything she has covered was else you want come out…food security?…(gangguan)..

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

The problem is that it is not yet...(interruption).

No, we must think: if we want food security, our padi farmers and padi fields must be valuable, have value, and really increase income..(interruption).

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Right, right, that is the value...(interruption). Okay, last question, is the result...(interruption).

That is why our fishermen also increase...(interruption)..diversify income..(interruption).

Deputy Speaker of the HouseEN

Honourable Penanti, if they have any questions they will come and meet you. Okay, thank you..(interruption)..

Do you know how many tonnes Kampung Terus can produce now? 7 tonnes per hectare, higher than Smart Sawah...(interruption)..

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Will the Kampung Terus project be extended to Permatang Pasir... that is my question... thank you..(interruption).

Deputy Speaker of the House

Okey pihak Yang Berhormat Penanti, berusaha bawa projek tanaman padi di Kampung Terus ke Permatang Pasir juga…(gangguan)..so that Permatang Pasir gets its all good rice on the table okey…(gangguan)…you now can give to them…(gangguan).

How do we save padi fields...(interruption)

Deputy Speaker of the HouseEN

I have given Honourable Penanti the one hour, you have exceeded one hour, sorry. Whoever questions you want to answer, you write to them, the State Assemblymen who asked that question, that's all, thank you. Continue, Honourable Member for Bagan Jermal. Relieved, Honourable Penanti. Very tense, afraid you would reach one level. I am a doctor, I understand.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Honourable Dato' Deputy Speaker, Honourable Members of the State Legislative Assembly, Heads of Government Departments, gentlemen, ladies. Good afternoon, peace be upon you. I think it is not only padi farmers or padi fields that are important, athletes and youth are also important. First, the opening speech...(interruption)..

Deputy Speaker of the HouseEN

I give you only 45 minutes..(interruption)..

Soon Lip CheeDAP · PHBagan JermalEN

Speech by His Excellency the Yang di-Pertua Negeri of Penang at the Opening Ceremony of the First Meeting of the Fifth Session on 27 May 2022, last Friday, concerning the efforts of the Penang State Government to engage youth and the development of sports in the State of Penang.

I would also like to record my sincere thanks and congratulations to all members of the House who were very keen to debate issues related to the Youth and Sports portfolio. I believe that the issues raised will further strengthen the quality of sports development and youth development in the State of Penang.

In line with the transition of the State of Penang towards the COVID-19 endemic phase, the State Government is always prepared to organise various new strategies and approaches to ensure the continuity of Sports and Youth Development in the State of Penang. For sports development, and also for athletes and sports facilities, including sports welfare, the development of a sports gallery is also important. Generally, the State of Penang has a dynamic and interesting sporting history and is regarded as a powerhouse (with permission) in the local sports arena. The achievements of athletes Ooi Tze Liang, Rachel Yeoh Li Wen and Lim Kok Leong at the SEA Games in Hanoi are proof that the State of Penang is capable of producing athletes of international standing.

Yang Berbahagia Dato' Wira Lee Chong Wei (Badminton), Yang Berbahagia Dato' Dr. Nicol Ann David (Squash), Chan Peng Soon (Badminton), Jiwa Mohan (Hockey), Jeffrey Ong (Swimming), Yang Berbahagia Dato' Thambukrishnan, PLBS Peyadesa, Yang Berbahagia Dato' Zaiton Othman (Athletics), Cheng Chu Sian (Archery) and many others are among the state's sports figures who have greatly brought honour to the country, contributed to the development of the local sports arena and brought pride to the State of Penang.

In the State of Penang, a dedicated Sports Gallery to showcase the history of sports and the athletes who have contributed to local sports has yet to be established. Accordingly, the Penang State Government, through the Penang State Sports Council, will establish a Penang State Sports Gallery with the following objectives:

i. One (1) special space to record and convey the history of Penang state sports to the general public; and

ii. One (1) initiative to display appreciation to state athletes who have contributed to or brought honour to the name of the state and Malaysia at the highest level.

The establishment of the Sports Gallery will be carried out in the hall of the Sony Recreational Sports Complex, Seberang Jaya, Central Seberang Perai District, managed by the Penang Stadium and Open Space Corporation (PSDKLPP). The space will be renovated and designed to become a Sports Gallery that is also themed around a sports arena filled with articles on milestones in local sports history, and will create an interactive space for visitors from among young people, youth or senior citizens so that they can appreciate the sports history of the State of Penang in a relaxed manner.

For the information of Members of the House, the Penang State Sports Gallery is currently under construction and is expected to be completed in early July 2022. It will be the first state-level Sports Gallery in Malaysia, apart from the sports galleries at the Olympic Council of Malaysia and the National Sports Council…(interruption)..

Syerleena binti Abdul RashidDAP · PHSeri DelimaEN

Dato' Speaker, may I interject briefly. Honourable Member for Bagan Jermal, I am very interested in the construction of the sports gallery because we cannot deny that in Penang there are many famous sports figures. At the same time, once that gallery exists, it can serve as an example or,…(with permission), show role models to our young people. But at the same time, I would like to know whether, when building the gallery, the State Government will also …(with permission), include Paralympians? Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for your views and also for your concern regarding the Paralympics. Indeed, in the State of Penang we always look after the welfare and names of all athletes, whether ordinary athletes or Paralympic athletes; we will include them all, and this has indeed been planned. This is a spirit to achieve the sports vision of Sports For All Vision... thank you...(with permission), Dato' Speaker.

DEVELOPMENT OF THE PENANG ELECTRONIC SPORTS ACADEMY

Through the Penang2030 vision, the State Government's efforts to realise a smart state will involve the development of the latest electronic sports at the local level, so as not to fall behind in the rapidly advancing generation of information technology and electronics.

Therefore, the Penang State Government will establish a Penang State Electronic Sports Academy to lead the development of electronic sports, particularly to create a dedicated centre for electronic sports and the implementation of introduction, development, introductory and training programmes for electronic sports with suitable facilities and amenities;

Training Penang state electronic sports players in the basics and good ethics of sport so that the general public does not hold negative perceptions of electronic sports, especially parents who may not fully understand what electronic sports is. Moreover, we can invite parents together with their children to come down to the electronic academy centre at KOMTAR, which will be implemented later;

Keeping abreast of developments and progress in the world of electronic sports and establishing collaboration with relevant stakeholders (for example: Penang State Electronic Sports Association, Digital Penang and also the Penang Youth Development Corporation (PYDC)).

The Electronic Sports Academy will be built on the 3rd Floor, KOMTAR and managed by the Penang State Sports Council (MSNPP), and is expected to begin operations in early July 2022. I still remember that in the previous session, YB. KOMTAR asked that efforts be made to revive KOMTAR, so now we can realise an academic e-sports academy at KOMTAR so that young people can come to KOMTAR in large numbers, and the economic development and the stalls doing business at KOMTAR will also benefit; this is to achieve Vision 2030.

Honourable Dato' Deputy Speaker, in line with the provision of SKIMAS incentives to high-performance athletes who succeed at international multi-sport events, such as the SEA Games in Hanoi, I, as EXCO for Youth and Sports, also take note of a small group of individuals who have succeeded in international and national championships but are not listed under the SKIMAS criteria, so they cannot be listed as eligible to receive such incentives.

My side and the Penang State Sports Council (MSNPP) have received a list of applications from groups who have achieved outstanding success in championships other than international multi-sport events, for consideration of incentives such as those offered by SKIMAS. Thus, a proposal to establish the Penang Public Sports Scheme 2030 or SAP2030…(with permission), Honourable Dato' Speaker, has been discussed. The Guidelines and Eligibility Conditions for SAP2030 are currently under study and will then be tabled at the State Government Meeting for consideration and approval, so that incentives can be given to athletes who succeed at international or national level, or those who are not under SKIMAS.

Penang Athlete Career and Education (PACE), established in 2020 with the objective of helping and supporting the success of Penang state athletes in the fields of education, career and welfare, and providing platforms, future opportunities and programmes as a foundation in giving confidence to state athletes and former athletes to secure their future in the sports field.

For everyone's information, since the establishment of PACE, a total of 157 Penang state athletes have received benefits and assistance from the Penang State Sports Fund (Tabung Sukan Negeri Pulau Pinang), with a total aid allocation of RM372,330.00.

The details of this assistance are as follows: for sports scholarship assistance there are 46 persons. One-off education incentive for 71 persons. Incentive for SPM students with 5A and above for 25 persons. Incentive for STPM students with 2A and above for 2 persons. Welfare assistance (medical costs) for 2 persons. Penang Junior Coaches Programme trainer allowance for 35 persons.

Efforts to improve assistance such as PACE are also continually reviewed and implemented from time to time. For example, the STPM incentive rate will be increased from RM100.00 to RM200.00 and the SPM incentive will be increased from RM50.00 to RM100.00 starting in 2022.

Efforts to help former athletes and Penang state athletes start careers in coaching are also carried out through the Penang Junior Coaches (PJC) programme, whose first series was successfully conducted from January to March 2022 through PACE.

For the information of Honourable Members, applications to register for the PJC programme are open to all Penang state athletes and former athletes who are interested in becoming young coaches aged 18 to 25 and residing in the State of Penang. The objective of the Penang Junior Coaches is to help them run sports training programmes so as to activate careers in coaching. Experience as a state athlete at national championships or equivalent, with reference to the conditions set by the Penang State Sports Council, is used as the basic eligibility for PJC to ensure their technical skills are at a high standard. For the First Series of PJC, there were 35 Young Coaches, while for the Second Series, which will be implemented starting June 2022, this month, 39 persons are expected to help these athletes lay a foundation in the coaching field and, at the same time, further strengthen sports at the grassroots level.

Performance of Penang state athletes at the SEA Games in Hanoi. I would like to take this opportunity to extend congratulations and well done to the national contingent that recently competed at the Southeast Asian Games, or SEA Games, the 31st edition, in Hanoi, Vietnam from 12 to 23 May 2022. The Malaysian contingent managed to win a total of 39 gold medals, 40 silver medals and 90 bronze medals and finished sixth overall in the championship. Well done and congratulations to all national athletes, coaches and officials involved, including the sports associations involved. As EXCO for Youth and Sports of the State of Penang, I am pleased to inform you that five (5) Penang state athletes contributed to the Malaysian contingent's gold medal tally. Rachel Yeoh Li Wen (Gymnastics - Artistic), she contributed gold in the Individual Uneven Bars and Individual Balance Beam. Ooi Tze Liang (Aquatics - Diving), he contributed gold in the Men's 1M Springboard and Men's 3M Synchronised Springboard. Lim Kok Leong (Billiards - Snooker 6-red Men's Individual), contributed one gold, and also Geerijaieswaran Pillai Sivanesan/Muhammad Arif Afifuddin Ab Malik (Karate - Kumite) contributed gold. A total of six (6) gold medals were contributed by Penang state athletes, two silver medals and 14 bronze medals. Congratulations and well done to all who contributed these medals to the contingent for the State of Penang.

For the information of all Honourable Members, the National Sports Council also recognised the Penang state artistic gymnastics athlete, younger sister Rachel Yeoh Li Wen, as the Best Female Athlete for the Malaysian Contingent at the SEA Games in Hanoi. Congratulations on this recognition and achievement. For the Sukan Malaysia (SUKMA) 20th edition…(interruption).

Kumaresan a/l AramugamPKR · PHBatu Uban

Minta pencerahan.

Soon Lip CheeDAP · PHBagan JermalEN

Yes, please, Batu Uban.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Thank you to the Honourable Member for Bagan Jermal. Congratulations also to all the winners, especially the athletes from Penang. I just want to ask briefly: will we also provide some contribution, as we do when they win medals at the Olympic Games and so on? For the SEA Games too, will those who win these medals be given a sum of cash? Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Yes, thank you, Batu Uban. As I listed just now, the SEA Games are indeed under SKIMAS, and so is SUKMA, which is also under SKIMAS. However, a few internationally-ranked sports, such as the championships organised, are not under SKIMAS. So, as I said just now, I am studying the establishment of a Penang2030 Public Sports Scheme so that all athletes who are not under SKIMAS will also receive this incentive. The SEA Games are indeed under SKIMAS. Let me continue. The 20th Sukan Malaysia (SUKMA). Majlis Sukan Negara (National Sports Council, MSN). Programmes and arrangements for the 20th SUKMA were originally scheduled to be held in 2020 in Johor, but were postponed because they were cancelled and rescheduled to 29 September to 8 October 2022, to take place in Kuala Lumpur, Selangor. The Penang State Government, through MSN, is now in the preparatory phase to ensure that training programmes and the preparation of high-performance athletes are prioritised and continued in order to face this 20th SUKMA. A total of 31 types of sports will be contested at SUKMA 20 in 2022.

Organisation of the Penang Community Olympic Carnival 2022. Since 2019, the Penang State Government, together with MSN, has received recognition or approval to organise jointly with the Olympic Council of Malaysia in conjunction with Olympic Month or Olympic Day on 23 June 2019. Therefore this year, 2022, we once again have been given the opportunity and mandate to organise the 'Penang Community Olympic Carnival 2022', which will take place, or has already begun, from 15 May until 23 June. On 23 June, Olympic Day, we will carry out, in conjunction with Olympic Day, the Bendang Walk, which is open to the public who register and is free for all participants who take part. Our Chief Minister will come down to join the President of the Olympic Council together to flag off and carry out this Bendang Walk programme.

Development of sports sector projects under the supervision of the Penang Stadium and Open Spaces Corporation (Perbadanan Stadium dan Kawasan Lapang Pulau Pinang). Allow me to share a fair amount, including the current status of projects supervised by the Penang Stadium and Open Spaces Corporation as the implementing agency that monitors these projects. The Sport City in Batu Kawan, as I answered in the first question, the oral question from Bukit Tambun, where indeed the State Government is planning to develop a Sport City in Batu Kawan, with the remaining land amounting to 144 acres, will be planned and developed for the development of sports facilities at this Sport City Batu Kawan. Furthermore, there is the Pokok Sena Sports Complex. The ADUN for Permatang Berangan was present with us during the engagement session, but the ADUN for Sungai Dua was invited, though perhaps because it was after Raya, many Raya open houses meant they could not attend the engagement session. The engagement session was held on, if I am not mistaken, 14 May 2022, and we collected many proposals and ideas or comments for sports development, the Pokok Sena Sports Complex, and this year the Stadium Corporation will carry out upgrading works for the football pitch and existing football fields at the Pokok Sena Sports Complex. It is expected that this project will be in the plan over three (3) years; for next year, perhaps we will add more sports facilities that were proposed and given views by residents around the area during the physical engagement session as well as the online engagement session, where sports facilities will be added.

The Seberang Jaya Public Swimming Complex has already been taken over by the Stadium Corporation, and the Public Swimming Pool Complex has been leased to D'Swim Academy Sdn. Bhd. The project is expected to be completed and opened to the public in early 2023. The 'WoodHAVEN' project, the fourth project, is the 'WoodHAVEN' project where the 'WoodHAVEN' site is on Jalan Betek. The proposal to establish a natural recreational park, nature park... (with permission), Deputy Speaker, known as 'WoodHAVEN', was presented and approved at the State Government Executive Council meeting on 22 July 2020, and now the groundbreaking ceremony was held on 9 April 2022 by the Chief Minister of Penang. Three (3) Pokok Mertajam trees were planted during the ceremony as a symbol for the area. Nibong Tebal Arena, the fifth project currently being carried out, is indeed a project under the Pakatan Harapan Government manifesto of 2018. Today Seberang Jaya is not in the House. We announced on 19 May by the Chief Minister under the Penang State Government that 90% of the manifesto listed in 2018 has been achieved. This is the fact. Nibong Tebal Arena is one of the listed projects.

Development of Sports Facilities. For your information, as of 31 May 2022, an allocation of RM5.64 million has been used for the development of sports facilities in the State of Penang. This is the question raised by Permatang Pasir earlier, where since 2018 until now, how much allocation has been allocated for the upgrading and construction of new sports facilities? This includes the development of 31 sports facilities and 34 sports facilities that have been upgraded through the District and Land Office. In 2022, a total of 10 projects have been approved, including one futsal court, five sepak takraw courts, one sepak raga tuju court, one basketball court and two jogging track routes. There are also several projects that have not yet been approved, such as at Pengkalan Kota, a basketball court. We are still waiting for comments from MBPP (Penang Island City Council) on the dates they will carry out tree felling works, as well as applications at other locations such as in Jawi. Next week we will carry out a visit to study the upgrading of the basketball court at Bukit Panchor and also at Taman Berjaya, for the addition of street lights for the jogging track. Allow me, Dato' Deputy Speaker, to answer the questions directed by the ADUNs. The establishment of gym centres is also one of the State Government's initiatives in providing public facilities and comprehensive sports facilities to the community. Currently, there are four (4) gym centres, namely at KADUN Seri Delima, at KADUN Sungai Pinang, at KADUN Penanti, and at KADUN Seberang Jaya. Thank you to Honourable ADUN Sungai Pinang, who asked...(interruption)

Deputy Speaker of the HouseEN

That's why Seri Delima looks really fit, gym-wise.

Soon Lip CheeDAP · PHBagan JermalEN

Sungai Pinang is also fit, Norlela too, YB. Penanti is also fit. For the information of the Honourable Member, an opening ceremony will be held this month, and I believe it will encourage local residents to carry out exercise activities at the gym centres concerned.

Furthermore, the opening ceremonies for the gym centres at KADUN Seri Delima, Penanti and Seberang Jaya will also be held in the near future. On this occasion, I would also like to convey my many thanks to Honourable Batu Uban, who raised several questions and requests regarding the addition of allocation under Sports Development under P01(59). So far, the State Government still maintains the existing allocation amount of RM1.6 million. However, the State Government will also review current expenditure and will make further consideration according to current needs and the increase in prices of construction materials. Therefore, the allocation can be reviewed and increased to RM2 million next year. As the EXCO, I will request consideration and approval from the State Finance Office. Please, Sungai Dua.

Thank you, Bagan Jermal. I was interested in what...(interruption).

Deputy Speaker of the House

Soalan atau?

What was presented by..(interruption).

Deputy Speaker of the HouseEN

Ha, Sungai Dua, a question or a proposal?

An additional proposal. A proposal. Just a little. Regarding the construction of a complex or gym, sports venues, gyms and so on, all areas already exist; I see that all DUN areas in Sungai Dua only have 1 futsal court. The futsal court that YB has built, thank you very much. Only, I have one field, one field whether owned by MBSP or open land in Permatang Buloh, close to a school. I think it is owned by MBSP. So I have applied for development, but until now it has not yet been done, and its use is quite heavy with the village area there. If possible, please include it, and one more, the people's gymnasium just now: in the Tasek Gelugor area, I think there is still no people's gym for facilities. There are many private gyms, but you have to pay, you have to become members and so on, but this is for village people who also want their bodies to be buff, so there must also be, so that people are afraid to come to Tasek Gelugor, there are many buff bodies. So if possible, please include it too. This is my personal request for the area.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, ADUN?

Sungai Dua.

Soon Lip CheeDAP · PHBagan JermalEN

ADUN Sungai Dua, who gave the proposal and also the request. I welcome the letter from Sungai Dua for upgrading or repair or construction because...(interruption).

Deputy Speaker of the HouseEN

Bagan Jermal is here.

Goh Cheon AikPKR · PHBukit TambunEN

A question seeking clarification.

Soon Lip CheeDAP · PHBagan JermalEN

Just a moment, I will answer Sungai Dua first. Also, regarding the request for a people's gym either at KADUN Sungai Dua or KADUN Permatang Berangan, I welcome it if there is a need to write a letter to me, and we will go down together to carry out a visit and study. Indeed, the Pakatan Harapan Government of Penang and throughout Malaysia, we do not care whether it is an opposition party's area or not. The Pakatan Rakyat Government always looks after the benefits or needs of the common people. Yes, please proceed, Bukit Tambun.

Goh Cheon AikPKR · PHBukit TambunEN

Yes, thank you. Here I propose that at Batu Kawan Stadium, a people's gym or a gym of a commercial nature can be held. That is the request from Bukit Tambun.

Soon Lip CheeDAP · PHBagan JermalEN

Okay, noted. I will ask the new CEO, Encik Zulkahar, to take note of the proposal, and we will study it. Honourable ADUN Bertam has requested the installation of street lights at the football field of the Seberang Perai City Council (MBSP) Recreational Sports Complex. For the information of the Honourable Member, the hockey field in Bertam has already been upgraded with the installation of street lights. Therefore I think it is indeed necessary to install street lights for the football pitch so that young people, the users, can use the pitch at night. I ask MBSP to take note for the upgrading works of street lights at the football pitch, if possible using this year's budget. Honourable ADUN Permatang Pasir questioned the allocation from the National Sports Council to the Penang State Sports Council since 2018. For the information of the Honourable Member, the allocation received by the Penang State Sports Council in

2018 was RM9,168,000, while for 2019 and 2021 it was only RM7 million each year. Honourable ADUN Bukit Tambun expressed views regarding the importance of holding a post mortem session...(with permission), Dato' Deputy Speaker, for Penang Football Club (PFC). In this regard, a meeting session with the coaches and players of Penang FC with the management was held on 13 May, yesterday. Apart from that, a post mortem is also being carried out during the international break to re-examine the performance that declined in the previous matches this season. This is to understand the issues faced by the coaches and players throughout this season. I am confident that the performance of Penang FC can be improved in the next matches. I fully understand where the ADUNs in this august House are, not only ADUNs but also football fans, the common people, who indeed care deeply about the development of football in the State of Penang, and I am indeed of the view that football is one of the sports that is important not only in the State of Penang but also important in Malaysia and in other countries, as fans and supporters always want to see the Penang State team win in the football fields being contested. Yes, please proceed, Bukit Tambun.

Goh Cheon AikPKR · PHBukit TambunEN

Dato' Deputy Speaker, Bagan Jermal. Yesterday I had just touched on the request for a post mortem for Penang FC, and today we have already got a new Head Coach. So I hope that with the presence of Zainal Abidin Hassan, the performance of Penang FC will be able to achieve more encouraging results.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the proposal, and also from Bukit Tambun. I am confident that with the new Head Coach, who previously led Pahang to win the FA Cup for Pahang FA in 2013, Coach Zainal Abidin can help revive the Penang FC squad so that we can achieve our KPI of reaching the fifth or sixth place.

The Honourable ADUN Bukit Tambun also proposed that Penang FC make Batu Kawan Stadium its main stadium. For the information of the YB, Penang FC has indeed planned to make Batu Kawan State Stadium its main stadium. Therefore, the Malaysia Malaysia Football League MFL was invited to carry out an inspection of the training ground in February 2022, and they were of the view that there are still some facilities that are not yet ready for hosting the Malaysia Super League.

Honourable Deputy Dato' Speaker, I am answering a question on Youth that was raised by our fellow ADUNs, such as Batu Uban, who also proposed that the PYDC add a Penang youth volunteer category to attract more youth to join this programme.

For the information of the YB ADUN Batu Uban, at present the existing categories have so far covered most aspects for participation by the Penang Youth Volunteers. However, efforts to attract more youth to join the programme continue to be carried out by the PYDC, such as strengthening social media platforms, holding roadshows at various programmes, and promoting the Penang Youth Volunteer programme to young people.

The Honourable ADUN Batu Uban also proposed that the Penang Youth Development Committee (JBPP) be given recognition and that the proposals from the Young Parliament Simulation be taken into account. For the information of the Honourable Member, JBPP is an entity recognised by the Penang State Government through the (PYDC) in efforts to develop youth in every KADUN starting 1 May 2022, and the Young Parliament Simulation is a pre-sitting preparatory session. Young Parliament is a special sitting for Young Parliament Members. The proposal to involve JBPP in the Young Parliament Simulation may be considered for the purpose of exposing JBPP members to the decision-making process at State level. The upcoming Young Parliament programme will also open opportunities for JBPP members and youth who are interested to participate.

The Honourable ADUN YB Seri Delima also stated that the initiative of beautifying an area with murals with an art and music concept can promote an area. Accordingly, the Penang State Government will open opportunities for youth to showcase their talents in that area.

Youth involved in the field of music are also not left out, to earn an income through an initiative under "Youth with Rhythm", which aims to collect information on musical talent among youth in Penang. Through this initiative, a community for young Penang musicians can be established. Youth also have the opportunity to perform at events that require talents such as singing and so on. Indirectly, youth can earn income from their talents through the platform established. For example, the Penang Youth Talent Search Programme was also launched to collect talented youth in various fields, and selected youth will be performing at Penang State Government Official Functions. This programme has been announced, and the registration and application dates are from 26 May 2022 until 26 June 2022.

I also acknowledge the views of the Honourable Sungai Dua on involving Youth Associations in efforts to develop the young, especially in rural areas. I also welcome the Honourable Sungai Dua to quickly find a suitable place to establish a Youth Centre in Sungai Dua, a rural area or Permatang Berangan, because the first youth centres have been established in KADUN Penaga, followed by Balik Pulau, Penanti and other places.

The Honourable Sungai Pinang mentioned the development of Penang youth, including welfare, employment and business aspects. For the information of the YB, for employment, the State Government through the PYDC has set up a career search portal initiative, with permission of Dato' Deputy Speaker, "We Want You", as in my speech earlier. As additional information, there is a 29.02% success rate for those who have obtained employment as of May 2022. Apart from the portal, the PYDC also holds career fairs and open interviews, with permission of the Deputy Dato' Speaker.

Furthermore, for business aspects, the State Government through the PYDC has also launched the Penang Start-Up Accelerator Program, the Youth Entrepreneurship Challenge (YEC) 3.0, and the creation of employment opportunities in the music field through "Youth with Rhythm: Youth in Music"….(with permission), Deputy Dato' Speaker.

For all of this, an entrepreneurship programme for youth was also launched to start up businesses by registering and undergoing training and courses that will be conducted. This programme is jointly organised by PYDC, Vincaps Capital and BigDomain. Meanwhile, YEC is a strategic collaborative initiative of the Penang State Government through the PYDC, involving a partnership with the Malay Traders and the Federation of Malaysian Manufacturers (PERDASAMA), the Penang Chinese Chamber of Commerce (PCCC YES) and the Malaysian International Chamber of Commerce & Industry (MICCI) under the "Youth for Future" initiative, to foster youth interest in entrepreneurship and encourage youth entrepreneurship.

Dato' Deputy Speaker, regarding the establishment of JBPP, JBPP already exists in the KADUNs, which have submitted proposal papers for the organisation of programmes. Five (5) programmes have so far been organised by JBPP, and recently they have also received proposal papers from the Honourable Sungai Pinang and also the Honourable Penanti. I encourage the JBPPs in the KADUNs to be active and to work together with the ADUNs to organise programmes for youth and to further strengthen relations between youth and our community, so that they can give views and collaborate more closely to advance youth development.

Youth Volunteers. In addition, in line with the Penang2030 Vision, this initiative has received an encouraging response since it was launched on 1 May 2020 to establish Youth Volunteers in Penang. So far, there are 2,205 Penang Youth Volunteers who have registered and actively participated in various activities and programmes that have been organised.

For the information of the Sidang Dewan, the Penang Youth Volunteers Appreciation Ceremony was held on 14 May 2022, which was a special event to record appreciation and recognition for the contributions and efforts given by the Penang Youth Volunteers. In conjunction with the Appreciation Ceremony, excellence contribution awards were presented to 19 Penang youth volunteers based on the amount of time given to participate in the volunteer work organised. The highest attendance record was 49 hours since 2020, by Saudara Muhammad Afiq Danial Bin Mazli.

As for youth centres, as I mentioned earlier, so far seven (7) youth centres have been officiated. These are the Penaga Youth Centre, Balik Pulau Youth Centre, Bertam Youth Centre, Pongsu Seribu Youth Centre, Penanti Youth Centre, Bagan Jermal Youth Centre, Sungai Pinang Youth Centre, and recently, last Sunday, the Batu Kawan Youth Centre was also officiated. It is also on the list for officiating: the Pulau Betong Youth Centre, Seberang Jaya Youth Centre, Bukit Bendera Youth Centre and Pinang Tunggal Youth Centre.

For BEST! Anak Penang, the Penang State Government has established the "Best! Anak Penang-Penang Young Talent Excellence Incentive Scheme" through the approval of the State Executive Council Meeting on 30 July 2021 and confirmed on 4 August 2021, to recognise the excellence and achievements of young men and women aged 15 to 30 in terms of academic achievements and co-curricular activities at national and international levels.

The PYDC has received six (6) applications, and five (5) applications were not eligible because their competitions were in 2021. Thus, there was one application submitted by Encik Brenden Tang Yew Liang, a 19-year-old SUKMA golf athlete of the Penang State. He has been awarded by The Malaysia Book of Records in the following: (1) Most Golf Training Aids Invented, (2) Youngest To Invent Golf Training Aids and (3) Longest Non Stop Driving Relay.

I would like to take this opportunity to call on young people of Penang who have brought honour to the State of Penang to actively apply for this scheme, because this scheme is a positive encouragement from the State Government to give motivation and recognition to all young people. Although this category is not an academic/co-curricular category, the application will be evaluated by the committee for BEST! Anak Penang.

New voters. Political awareness. For the information of the beloved Sidang Dewan, the Penang State Government is always concerned and attentive in encouraging the participation of new voters in efforts to instil strong political awareness, especially among Penang youth.

In Penang State, the number of registered voters in 2018 in Penang State was 945,627 voters. The latest voter register for March, gazetted on 15 April 2022 in Penang State, was 1,222,800.00 voters. Therefore, according to the latest statistics, the increase is 277,173, or new voters of 22.67% in Penang State. The age breakdown of voters is as follows: for ages 18 to 20, 52,479; for ages 21 to 29, 230,295; and for ages 30 to 39, 240,897; ages 40 to 49, 217,361; ages 50 to 59, 198,810 voters; ages 60 to 69, 159,195; ages 70 to 79, 87,850 voters; ages 80 to 89 in Penang State there are 29,222 voters; ages 90 years and above there are 6,691 voters.

Following the lowering of the voting age and the Automatic Voter Registration (AVR), which was gazetted and enforced on 15 December 2021, the PYDC also implemented the Undi18 Campaign as a general campaign to further raise awareness among youth who will be involved in the upcoming elections. The Undi18 Campaign programme includes activities such as the Undi18 Campaign Roadshow, the Undi18 Campaign Animation Video and the Undi18 Campaign Survey.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Request for clarification from the Honourable Bagan Jermal. Thank you, Honourable Bagan Jermal, for sharing earlier the figures for the age groups of registered voters in line with the Undi18 Policy and also this automatic voter registration. Earlier, the Honourable Bagan Jermal gave a breakdown for the whole state, but what I want to obtain is information on whether the Honourable Bagan Jermal has a breakdown or division of these age groups according to Parliamentary constituencies or State Assembly constituencies, and earlier the Honourable Bagan Jermal also raised the good initiative of holding outreach programmes to provide education or information especially to these new voters. But I feel the Honourable Bagan Jermal directed that to those who are still youth. What about those who register automatically but are older? Perhaps those who are senior citizens but have only just registered can also be counted as new voters. Perhaps we can see the videos or materials prepared that can be directed to this group too. Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the question directed by the Honourable Pengkalan Kota. Indeed, he is the youngest ADUN in this House. Who really cares about new voters.. oh, same as the Honourable Batu Uban, okay. Indeed, the statistics I have from the SPR are up to the age statistics gazetted on 15 April 2022. For example, in Tanjung Parliamentary constituency P049, voters aged 18 to 20 number 775 and voters aged 21 to 29 number 4,424, but voters aged 90 years and above are the most numerous at 1,489 in Tanjung Parliament, and in Parliamentary constituency P045 Bukit Mertajam, the voters who are most numerous for ages 18 to 20 number 5,525. And also for ages 21 to 29, the most are in Bukit Mertajam, Bukit Mertajam Parliamentary constituency, at 24,191. Indeed there are breakdowns of statistics for age categories, but for the question directed by the Honourable Pengkalan Kota, who has been over 21 years of age and had not registered as a voter until now, and now with automatic voter registration, his name will automatically become a voter. I have asked the SPR how many are in this category; there is also that category, but there are no statistics that can be attached for us, and according to these statistics it has indeed shown the importance of new voters for the 15th General Election (PRU ke-15). Therefore, the demand from new young voters, their voices, their views, such as today, the Young Parliament has eight (8) participants who have come to our House to attend and witness the way arguments are debated and the points raised. Indeed, with the Young Parliament Programme, we can provide a platform for youth to bring motions or raise important issues for debate. The efforts of the Undi18 Campaign as listed are to enable youth, especially first-time voters, to be exposed to knowledge about elections in Malaysia and to be able to understand the voting process in Malaysia through simulation sessions. I believe it will help increase youth awareness of the importance of voting and subsequently increase voter turnout in the upcoming elections. For the information of the respected Sidang Dewan, for the Undi18 Campaign survey activity, survey forms were prepared throughout the period to obtain the views of youth, where the current number of respondents was 842 people. The current poll results for the questions asked are as follows:

First question - Have you ever voted? Yes, 36.4%. Have you ever checked your voter status? Yes, 53.8%. Awareness that at 18 one can vote. Yes, 83.2%. Awareness of automatic voter registration. Yes, 54.9%. Are you interested in learning more about the democratic system and the voting system in Malaysia? Yes, 81.0%. Through this study, it shows that so far there are indeed many new voters or young voters who care that they have the right to become voters and will choose the leaders who will lead our country or our state. Once again I would like to express my highest appreciation and thanks for the concern, attention, criticism and continued support from the Honourable Members, especially towards…(interruption).

Joseph Ng Soon SiangDAP · PHAir Itam

Dato’ Speaker.

Deputy Speaker of the HouseEN

Not enough time.

Joseph Ng Soon SiangDAP · PHAir ItamEN

I only have a little.

Deputy Speaker of the House

Sukan?

Joseph Ng Soon SiangDAP · PHAir Itam

Sukan.

Deputy Speaker of the HouseEN

A question or a suggestion?

Joseph Ng Soon SiangDAP · PHAir ItamEN

Er, a question. Because earlier I was really waiting.

Deputy Speaker of the HouseEN

A little later during tea break, you may ask. Thank you. Ar, Bagan Jermal.

Joseph Ng Soon SiangDAP · PHAir ItamEN

This is indeed related to many people, Dato' Speaker. Just one. Thank you.

Deputy Speaker of the House

Silakan.

Joseph Ng Soon SiangDAP · PHAir ItamEN

The Honourable Bagan Jermal.

Deputy Speaker of the HouseEN

Answer Bagan Jermal's question.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Wait, I have one question. Thank you to the Honourable Bagan Jermal for the effort to provide three sepak takraw courts in the Air Itam area, where he is on a plot of land at Kampung Suria near Kampung Melayu. However, I have written a letter to the Stadium and Open Space Corporation (Perbadanan Stadium dan Tanah Lapang) to take over the maintenance of the field because the land is under the North East District, North East District and no one will maintain it. Whenever it rains or is hot, the grass there keeps growing. And when we, we asked MBPP to do it, it is not within their jurisdiction. So, now my question. The sepak takraw courts have been nicely prepared, but maintenance has become an issue…(interruption).

Deputy Speaker of the HouseEN

Air Itam, I think this question has been asked.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Not yet answered.

Deputy Speaker of the HouseEN

Yes, but it has been asked.

Joseph Ng Soon SiangDAP · PHAir ItamEN

No, it has never been asked.

Deputy Speaker of the HouseEN

Can you discuss it with MBPP?

Joseph Ng Soon SiangDAP · PHAir ItamEN

Cannot. That is why I need to know what the purpose is of setting up or establishing the Stadium and Open Space Corporation to take over the open land. But my request was rejected without a site visit being made with me. Thank you.

Deputy Speaker of the HouseEN

Ask Bagan Jermal to respond to this question.

Soon Lip CheeDAP · PHBagan JermalEN

This is still a question or a problem that arose in the Air Itam area. As it has been said, Air Itam received a reply letter from the Stadium Corporation saying it could not be taken over for maintenance. Therefore, without a visit, I will ask…(interruption).

Deputy Speaker of the HouseEN

Do a site visit lah.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Honourable Member, the visit was made by the Stadium Corporation without my knowledge too. I was not invited at all.

Soon Lip CheeDAP · PHBagan Jermal

Okey, okey.

Joseph Ng Soon SiangDAP · PHAir Itam

Terima kasih.

Soon Lip CheeDAP · PHBagan JermalEN

I will ask the Stadium Corporation, their staff or CEO, to contact the Air Itam area so that Air Itam can understand the situation, why it cannot be taken over by the Stadium Board, and I will continue with the last sentence. I would like to express thanks for the support and comments of the Honourable Members, especially for the efforts carried out by the Penang State Government to add value and further strengthen the quality of delivery under the Youth and Sports Portfolio for more excellent development at state level. That is all, thank you. I beg to second.

Deputy Speaker of the HouseEN

Thank you, Bagan Jermal. Paya Terubong is invited to speak. The time now is 5.20, you have one hour.

Yeoh Soon HinDAP · PHPaya TerubongEN

Yes, okay. Thank you. Honourable Dato' Yang di-Pertua, Honourable Members of the State Legislative Assembly, Heads of Departments, gentlemen and ladies whom I respect, all. Greetings of peace. I would like to record my highest appreciation to this august House, for being given the opportunity to present the winding-up speech to answer supplementary questions on issues of tourism and the creative economy, which is a combination of the arts, culture, heritage and so on, which were raised throughout my debate session, the debate of the Honourable Members.

Achievements of the Tourism Recovery Action Plan. Honourable Dato' Yang di-Pertua, as the Honourable Members of the State Legislative Assembly are aware, the State Government through my office (PETACE) has launched and implemented a Tourism Recovery Action Plan to overcome the crises faced by the tourism and creative economy industries due to the spread of the COVID-19 pandemic. This action plan is implemented through three phases, namely: First Phase - Impact Mitigation, Impact Mitigation (Impact Mitigation) where economic stimulus packages and immediate mitigation have been…(interruption).

Deputy Speaker of the HouseEN

Yang Berhormat Paya Terubong, increase your auditorium audibility please.

Yeoh Soon HinDAP · PHPaya TerubongEN

Oh, okay, good. First Phase - Impact Mitigation (Impact Mitigation) where economic stimulus packages and immediate mitigation were introduced and implemented immediately to help and reduce the impact on the tourism and creative economy industries; Second Phase - Crisis Management (Crisis Management) by prioritising promotional campaigns focused on the domestic and international markets; and Third Phase - Economy Recovery (Economy Recovery) by prioritising the strategy of rebounding and driving visits (Rebound & Drive Strategy) to Penang by focusing on the domestic as well as international markets. This plan has successfully helped the tourism industry to navigate the effects of the pandemic well and continue to grow steadily for the future. Now, the PETACE Office is focusing on the Third Phase, namely Economy Recovery under the Tourism Recovery Action Plan. Among the strategies and plans of the Third Phase implemented by the State Government are cooperating with Online Travel Agents (OTA), airlines and tourism industry players to introduce various travel campaigns to attract tourists' interest and stimulate Penang State's tourism economy. Based on statistics/data obtained from the Online Travel Agent-Expedia, tourism promotion campaigns to Penang State implemented by the State Government have received a very good response overwhelming response, where Penang State was awarded second place in the list of The Top Malaysia Cities Booked in Year 2021, after our capital, namely Kuala Lumpur. Penang State also received more than 15 million impressions from four Experience Penang campaigns implemented by the State Government. Among the Experience Penang campaigns implemented during the period from 18 November 2021 until 13, sorry 31 December 2021, namely approximately one and a half months, which also managed to generate income totalling RM1,188,899.00 for tourism industry players in the state who participated in the campaign.

PLAN FOR RESTORING TRADITIONAL FLIGHTS AND EXPLORING NEW DIRECT FLIGHT ROUTES. At the same time, the State Government believes that direct flight routes are a very important backbone for the tourism industry, with the entry of international tourists into Malaysia through the entry point of Lapangan Terbang Antarabangsa Pulau Pinang; it also brings economic benefits to tourism industry players in Penang State and also in neighbouring states. As of 30 May this year, the State Government has successfully restored eight direct flights from Lapangan Terbang Pulau Pinang to eight international airports, namely the airport in Singapore, in Ho Chi Minh, in Taiwan, Medan, Jakarta, Surabaya and Suvarnabhumi Airport in Bangkok and also Don Mueang Airport in Bangkok as well. The State Government does agree with the proposal of the Honourable Member for Pantai Jerejak on the importance of the Middle East market such as Dubai. This market is very broad and cooperation can be carried out from various aspects, and not only in the tourism and creative economy sectors, including trade and also trade and so on.

Effective cooperation and collaboration will generate opportunities and bring benefits to the state as a whole. In this regard, the State Government is now exploring new markets such as the Middle East region including Dubai, Iran, Turkey and so on with vigour, to make the Middle East region a connecting hub between Penang and the international community. This effort is in line with the State Government's mission to explore the national tourism market, the western countries, to attract tourists from the European region, the United States of America and the Middle East. This is because tourists from those areas have higher spending power, higher spending power…(with permission), as well as longer holiday periods. They may take approximately one month or two weeks to travel and tour. This can contribute to the economic development of Penang and Malaysia as a whole. In addition, the State Government has also produced the 'Muslim Travel Guides' brochure, especially in Arabic, and has launched these 'Muslim Travel Guides' specially at Expo Dubai this year and also at the Arabian Travel Market held at the Dubai International Convention & Exhibition Centre, which also received a very strong response from the tourist market in the Middle East. As I answered this morning, I am trying to bring back direct flights of Middle East aircraft to Penang. In fact, this strategy is not only focused on tourists from the Middle East Region to Penang. In fact, it is also a good strategy to connect Penang with European countries and the United States of America. This is because the airlines in the Middle East such as Qatar Airways, Emirates and Turkish Airlines have very extensive connectivity in this world and cover major cities in Europe, the United States of America and also the African continent, which can bring tourists from the west through the Middle East here further to Penang. And apart from international flights, in terms of domestic flights as well, the State Government is also trying to work with airlines to open more domestic destinations, including direct flight routes to Melaka, which is also recognised as a World Heritage Site together with George Town, and this is to develop heritage tourism and also to develop the Twin City, Twin Heritage City. Here I would also like to take the opportunity to appeal to the Federal Government not to further delay the upgrading project of Lapangan Terbang Antarabangsa Pulau Pinang, in line with the State Government's aim to make Lapangan Terbang Antarabangsa Pulau Pinang an outstanding aviation hub in the Northern Region of Malaysia.

DEVELOPMENT OF HERITAGE TOURISM IN SEBERANG PERAI. Repair and Rectification, maintenance of heritage buildings under the Penang State Heritage Commissioner's Office covers the entire State as provided under the Penang State Heritage Enactment. The Penang State Heritage Commissioner's Office has already carried out an inventory and proposed gazettement of heritage for the entire state of Penang.

Recently, the State Government has approved and allocated RM1.0 million for the conservation and restoration works of the ruins of the Old Church of Pagar Tras, in Bukit Mertajam, which was founded in 1882 by a group of Catholic missionaries from France, in order to make the site, the site of the old church, a new heritage tourism product of Penang State. The Old Church of Pagar Tras is one of the oldest churches in Penang and also in Malaya. This conservation project is not only aimed at restoring and rebuilding the structure of the church building, but also to preserve the remaining standing structure of the ruins. This approach has been adopted by many countries, especially in Europe, on their heritage buildings to be used as heritage references and tourist attraction objects. The State Government, with the cooperation of the Northern Corridor Implementation Authority (NCIA), is also implementing the development of the Guar Kepah Archaeological Heritage Gallery as a scholarly and high-value heritage tourism destination in the North Seberang Perai district, which is expected to benefit the government, academicians, students, visitors and the local community. The development of the gallery is one of a kind on-site gallery with the archeo-edu-tourism concept, namely not only a place for exhibiting historical materials but also a place for the restoration of heritage objects and a place for recreational activities suitable for all levels of society. In addition, the State Government is also focusing on studies for the purpose of gazetting Malay heritage such as mosques, madrasahs, residential houses and traditional villages. Programmes and activities for promotion and tourism purposes will be implemented after the preparation of the Heritage Site Management Plan. At the same time, discussions have also been held with the Penang Malay Think Tank Association in an effort to conserve Malay heritage such as the House of Syed Sheikh Al-Hadi and the Residence of Tengku Kudin as an effort to empower Malay heritage and be developed as a tourist attraction. Please.

Thank you, Paya Terubong. I am just interested in what Paya Terubong raised regarding the expansion of areas for tourist attractions. Only, in my Sungai Dua constituency here, we have an agrotourism, I think Paya Terubong already knows about it. We run river tours from Labuh Banting, Air Itam to Pengkalan Machang. We launched it in 2017, and until now it is still running. Tourists have come, but it is still rather lacking, and I have already asked in Rolling Plan 2 to develop the area, all three areas, to be developed as the best tourist centre related to river tours. All three places do have places for tourists to rest and also to carry out activities. And at Labuh Banting we received an allocation of RM1.0 million for the development of the area from the Ministry of Rural Development, and if possible, please include this area as one of the tourist areas that we will upgrade, and the State Government also sees this matter as a place to be made a tourist attraction. As for the second point about the heritage just now, I think I have included it in a written question about these heritages. If possible, carry out conservation of selected areas in terms of Malay heritage, mosques, areas of traditional houses and so on that have heritage characteristics, and thirdly in terms of culture, if possible, let us include the cultural characteristics of all three races as an attraction for tourists. For example, in the past, Hotel Bayview held performances, ghazal performances at the restaurant on the top floor. Perhaps other places can also be done at these tourist attractions, we

include those elements, whether elements of the culture of the Malay race, the Chinese race or the Indian race, we can include as tourist attractions, like what is done in Indonesia. They have local community cultures when we include them. So it is more attractive in terms of when tourists come, it is more appealing, they have culture, they have arts, they also have handicrafts, perhaps that we can include as an addition to the tourist attractions coming to Penang. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you, Sungai Dua, for the input and also the suggestion. The State Government is indeed willing and ready to explore even more new tourism products, including those mentioned by Sungai Dua, and we, the State Executive Council (MMK), will study them and include them in the Penang State Tourism Plan. As for culture, as for arts and also Malay culture, I will present it shortly and I will certainly take note of what Sungai Dua proposes and action will be taken subsequently. And as for the balance of tourism development between the Island and Seberang Perai, in this regard and as also raised by the Honourable Sungai Dua, the State Government has introduced various initiatives, promoting tourism activities in Seberang Perai. For example, the State Government has introduced the promotional material "Opposite Side of The Island - Seberang Perai" to bring the flow of tourists to tourist destinations in the Seberang Perai area. Furthermore, 5 of the 7 container arts produced under the Penang International Container Art Festival (PICAF) have been moved to Seberang Perai and placed around Bandar Cassia. This initiative is to encourage people to visit and tour destinations outside George Town. The State Government is committed, with a pledge, to continue developing more tourism products in Seberang Perai and bringing tourists to Seberang Perai. And next, the overcoming of labour shortages in the tourism industry. Since the reopening and resumption of tourism economic activities, the tourism industry, like the manufacturing sector too, is facing labour shortage problems, which were also raised by the Honourable Teluk Bahang. In fact, the State Government has taken the initiative to organise the "Jom Cari Kerja" Expo in April to address this problem. The Expo was held on the Island and also in Seberang Perai with the participation of more than 60 units of industry players consisting of hotels, tourist attractions and so on. Furthermore, the State Government will also continue discussions with the relevant parties and stakeholders and give appropriate support.

MUSIC ECONOMY AND ALSO MUSIC TOURISM. As for the creative economy, for the information of the Honourable Members, music tourism is one of the aspects of tourism emphasised by the State Government, in addition to food tourism, heritage tourism, Muslim-friendly tourism and so on. Therefore, the State Government greatly welcomes the proposal put forward by the Honourable Seri Delima, where the Honourable Member proposed that music tourism should be developed as a new pillar of tourism. In response to the proposal of Seri Delima and also Bagan Dalam, who asked about the development of music tourism, it is informed that the State Government has greatly supported programmes and projects based on music or creativity in general, among them including open a weekend in Pulau Pinang in Penang.

Lee Chun KitDAP · PHPulau TikusEN

Excuse me for a moment, excuse me. Thank you, Honourable Paya Terubong, I just want to ask for clarification on a music institution in this state, namely Penang House Of Music. Penang House Of Music at Komtar, and I understand that Penang House Of Music is looking for a new place to relocate to, but, can the Honourable Paya Terubong give clarification on this information. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

Indeed, regarding the House Of Music, I would like to state that the House Of Music is an asset that is truly valuable to the State of Penang. Anyone who has visited the House Of Music will be impressed by the amazing things it contains. And throughout the lockdown during this PKP period, the House Of Music has indeed faced constraints and also difficulties in attracting visitors. Now, for the information of the Honourable Member for Pulau Tikus, the State Government has in fact helped and has allocated a substantial amount to assist the House Of Music every year since it was opened. There was indeed a proposal from the House Of Music to move out of Komtar, from this ICT Mall, because according to the House Of Music they are of the view that it would be more suitable for them to relocate from this ICT Mall to a place that may be easier for tourists to access, and the State Government is indeed making efforts and is in discussions with the House Of Music and also with the relevant parties in order to obtain a better solution for this House Of Music, and we indeed want the House Of Music to be maintained in a sustainable manner and also to be developed even more brightly.

Furthermore, the State Government has in fact reached the final stage of organising a concert by Andrea Bocelli and also Matteo Bocelli, classical tenor singers among the greatest in the world, earlier this year. The concept of the concert also emphasised the involvement of the local community, because we proposed to involve local artistes in the concert to give local talent the opportunity to perform together with Andrea Bocelli and Matteo Bocelli, who are regarded as very great classical singers. Unfortunately, the concert had to be cancelled because it faced several major constraints, mainly the pandemic situation that was still not under control at that time. Therefore, the MKN (National Security Council) at that time advised against and rejected the request to hold the concert. However, given that the pandemic situation has now already become endemic, and we do have a plan to reactivate concerts of this kind, and we indeed hope that we will invite Andrea Bocelli and Matteo Bocelli, who are indeed famous singers, back to Penang to hold a concert, and the State Government is in discussions with artistes from the United Kingdom, Hong Kong, India and Korea for a concert that is expected to be held starting from December this year.

Next, I would also like to respond to the input of the Honourable Member for Sungai Dua, who raised the proposal to promote the culture and heritage of the Malay race. It is informed that the State Government is in discussions on the organisation of the "Festival Melayu Nusantara" which is expected to take place in October, and indeed all preparations are in progress. The Festival Melayu Nusantara will showcase and display the culture, heritage, traditions, arts and other aspects of the Malay race or community, and will include ghazal parti, and boria, which is a tradition, will also be included in the Festival Melayu Nusantara to promote the spirit of silaturahim among one another and also to empower this Malay heritage, and it will also become an attraction and an iconic festival for the State of Penang as well. And regarding the conservation of the Bukit Bendera area, to also answer the Honourable Member for Sungai Dua, the State Government through the Penang Hill Corporation has adopted appropriate measures to ensure that the development of the Bukit Bendera area does not have a negative impact on the existing area. Among the measures implemented are a slope stabilisation project, the use of the Green Building Index (GBI) rating tool for the Penang Hill Gallery @ Edgecliff project and the upgrading project of the Bukit Bendera Upper Station to create a low-carbon city, reducing carbon emissions through the Bukit Bendera traffic management plan that will take effect from 1 June 2022, monitoring and regular inspections carried out so that there is no dumping of construction materials or rubbish in the hill area and so on. And the System and Structure for the Maintenance and Conservation of the UNESCO World Heritage Site. To answer the Honourable Member for Pengkalan Kota, I am pleased to inform that after 14 years since being recognised as a UNESCO World Heritage Site, the system and structure for the maintenance and conservation of the George Town Heritage Site has been successfully carried out through the Technical Review Panel of MBPP and the efforts of the Heritage Conservation Department of MBPP as well as George Town World Heritage Incorporated (GTWHI). In particular, the Penang State Government has established GTWHI since 2010 as the Manager of the UNESCO George Town Heritage Site to carry out engagement, education and free consultation activities for all stakeholders, especially building owners, building tenants, building occupants and site users within the UNESCO George Town World Heritage Site. Although the UNESCO George Town Heritage Site has generally been managed better, the structural damage to the heritage building at Pengkalan Weld that recently occurred due to roof finishing works is indeed an unfortunate incident, and it occurred because some individuals or parties still do not comply with and do not understand the procedures of the rules and methods of maintenance and conservation as stated in the UNESCO George Town World Heritage Site Special Area Plan that was gazetted in 2016 and is subject to the Akta Perancang Bandar dan Desa 1976. And I recommend and assure the Honourable Member for Pengkalan Kota that the Penang State Government will continue efforts to take swift action, and also strong action, by imposing appropriate punishment on the parties who are careless, negligent and remiss, in order to prevent such incidents from being repeated.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Explanation. Thank you, Honourable Member for Paya Terubong. I indeed thank the Honourable Member for Paya Terubong for the commitment and assurance given so that a real action can be taken against the incident that occurred to Warehouse Number Seven (7) and Number Eight (8) along Pengkalan Weld. However, I feel this issue should be made a lesson, because the parties involved in opening the roof finishing for the warehouse structure, which is a category two heritage building, are part of a Government agency, and this should not have happened in this UNESCO Heritage Site. But I do thank the Honourable Member for Paya Terubong for the commitment given earlier. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you, Pengkalan Kota. And I hope that such matters will provide a lesson to other parties too, in future, so that in time to come they can be more careful and more cautious in order to preserve the George Town Heritage Site area, so that we do not have anything that will affect our status. I would also like to take this opportunity to remind all parties to obtain a certificate from the Technical Review Panel and approval from the Penang Island City Council (MBPP) before any work is carried out at the George Town Heritage Site. If you need any professional assistance in this matter, you may contact George Town World Heritage Incorporated (GTWHI), which will always be ready to help. And in conclusion, I would like to state that the State Government will continue to develop the tourism and creative economy sectors so that both sectors can grow rapidly and become among the major contributors to the Gross Domestic Product (KDNK) for the State of Penang, and I believe that the achievements of the Penang State tourism sector will become an example and provide inspiration to other states. With this, thank you, I move to support.

Deputy Speaker of the HouseEN

Thank you, Paya Terubong. Tanjong Bunga is invited to speak.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Deputy Speaker of the State Legislative Assembly.

Deputy Speaker of the HouseEN

Time is needed until 6.30 pm.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, Honourable Member.

Deputy Speaker of the HouseEN

The faster, the better.

Zairil Khir JohariDAP · PHTanjong BungaEN

Honourable Member, Deputy Speaker of the State Legislative Assembly. Firstly, I would like to express gratitude that this august House was able to sit smoothly and successfully at the First Meeting of the Fifth Session of the Fourteenth State Legislative Assembly. Thank you to all Honourable Members, the State Assemblymen, for the cooperation given in this session in discussing all issues concerning the welfare of the people of the State of Penang.

Indeed, the State Government has always taken proactive steps in drawing up short-term, medium-term and long-term plans to revive the economy of the State of Penang, which was affected by the COVID-19 pandemic that has struck the world. Indeed, the plans drawn up are supported by a robust and sound strategy, particularly those relating to the development of the infrastructure and transport sectors. Deputy Speaker of the House, the Honourable Member for Jawi has requested that the Public Works Department (JKR) examine development projects in Seberang Perai Selatan (SPS) such as the Immigration Detention Depot Project and the Jawi Quarters so that there will be no disruption of water supply during their operation later, considering that there is an issue of water supply in the area. In addition, the Honourable Member also requested feedback from the Penang Development Corporation (PDC) regarding the postponement of the construction project of the bridge across the Sungai Tengah. For the information of the Honourable Member, development projects under JKR will go through applications for Planning Permission (KM) and must obtain technical comments from the relevant technical departments or agencies. For the Immigration Detention Depot and Jawi Quarters projects, these projects have obtained KM approval, where in the KM comments, the Penang Water Supply Corporation (PBAPP) has required the construction of a pump house to overcome the water pressure problem in the area. For the information of the Honourable Member, the project is in the construction stage.

H’ng Mooi LyeDAP · PHJawiEN

Excuse me, may I have the floor. Tanjong Bunga, thank you for that answer. What I meant by the existing building is from Sungai Bakap Hospital. Because we understand that Sungai Bakap Hospital, I think, has been near Sungai Bakap for more than 100 years, and the existing facilities are no longer able to accommodate the number of beds in the hospital; when compared with the past until today there are quite many differences. So what I mean is, we need to ask the JKR or the Ministry of Health to re-examine the basic facilities that are available. Because we are worried, and I often receive complaints from Sungai Bakap Hospital where they are also facing water supply problems. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, thank you Honourable Jawi for the issue on the provision of infrastructure and facilities at Sungai Bakap Hospital. This matter will be raised with the parties concerned, especially the Ministry of Health, because we need to obtain allocations from them to carry out the upgrading. I will highlight this matter. So, as for the postponement of the bridge construction project in Sungai Tengah, this bridge project has been postponed and cannot be implemented because a fire occurred at the rubbish disposal site in Pulau Burung, which has made it difficult to market the industrial land lots at Batu Kawan Industrial Park 2 (BKIP2), Ladang Byram. In other words, because the development of BKIP 2 has also been postponed, this project is also postponed as well. Mr Speaker, the Honourable Bertam raised the problem of the U-turn that is too far in the Construction Project for a two (2) lane to four (4) lane road at Permatang Pak Elong. For the Honourable Member's information, the project in question is the project to build a two (2) lane to four (4) lane road from Permatang

Pak Elong to Jambatan Merdeka SPU. The main scope of the project is to upgrade the road and bridge over a distance of 9 kilometres starting from the Pak Elong junction to Jambatan Merdeka. This project completed construction on 20 April 2022. The Permatang Pak Elong junction is located at CH17,350 and Kampung Datok is located at CH20,500. The nearest U-turn is at CH18,700 to CH19,100. And also CH19,600 to CH20,000. The distance between each U-turn and junction actually meets the design and specification requirements set out in the road technical directive, namely less than 3 kilometres. In response to the Honourable Member's question on the need to provide pedestrian crossings for crossing the road, signalised pedestrian crossings have indeed been built at CH18,800 near the Public Market, while motorcyclists need to cross the road using the U-turns and junctions that have been provided. For the Honourable Member's information as well, the design of this road has complied with the Road Safety Audit and the Traffic Impact Assessment (TIA) to ensure that the safety of road users is prioritised. In addition, the Honourable Sungai Dua raised the issue of hill slope development that is still being carried out, such as in the Sungai Ara area, which has resulted in erosion, landslides and flash floods. For the Honourable Member's information, in order to ensure the well-being and safety of the public, public property and the public environment, and to reduce the impact of erosion, landslides and flash floods, the State Government has taken the following measures: First, establishing the Penang Safety Guideline For Hill Site Development 2nd Edition 2020. In the past we had the Penang Hill Side Guideline, but we made improvements in 2020; Second, establishing the Garis Panduan Keselamatan Aktiviti Pertanian Di Kawasan Berbukit. This is a new guideline that has been introduced by the State Government, so previously we did indeed have problems with agriculture on hills that was unorganised and did not follow safe specifications, so with this new guideline we are carrying out a regularisation process for agriculture on hills so that specifications will be complied with and the flow of water and so on, for example, will not be affected; Third, directing the Local Authorities (PBT) to monitor hill slope areas from time to time and to take appropriate action based on the relevant Act or Enactment for offences committed by landowners in hill slope areas; Fourth, ensuring that all development proposals in hill slope areas do not exceed a height of 76 metres above sea level and that building footprints must be located only on Class 1 and Class 2 slopes, as recorded in the State Structure Plan (RSN) 2030. The Honourable Kebun Bunga also raised this issue in his speech, so do not worry, we have always followed these procedures; Fifth, ensuring that existing agricultural activities carried out by gardeners and farmers on hill slopes do not obstruct natural water channels. This one is important, okay. Next, the Honourable Bayan Lepas asked about short-term solutions to traffic congestion on FT006 Jalan Bukit Belah. For the Honourable Member's information, the Upgrading Project from a Single Carriageway 2 Lanes to a Dual Carriageway 4 Lanes on Federal Route FT006 from Bayan Lepas to Teluk Kumbar Penang (Package 2A), a continuation of Package 2B, has been submitted to JKR Malaysia but has not yet been approved by the Economic Planning Unit (EPU). JKR State has submitted an application to the

State Economic Planning Unit (BPEN) so that this project can be listed in the priority list; we have put it as a priority, a priority project for the State of Penang. JKR State is planning to carry out a TIA study on the traffic congestion location starting from the Emerald Residence Section or Section 20 to Section 20.7, and the traffic lights at Jalan Sungai Batu, to prepare a suitable mitigation design. Mr Deputy Speaker of the State Legislative Assembly, the Honourable Berapit touched on the problem of vehicles having to queue for a long time to enter the Berapit, Kampung Besar area. The Honourable Member requested that an additional bypass route be added so that vehicles do not collide with vehicles from Jalan Kulim to Bukit Mertajam. For the Honourable Member's information, JKR has taken note of the congestion that is occurring and will work together with the Seberang Perai City Council (MBSP) and also the Royal Malaysia Police (PDRM) to find a traffic solution for the location, given that many vehicles use the road and it also involves land of the Ministry of Transport, which involves the main route of high-speed electric trains, and therefore requires a more detailed study to resolve this issue. Next, the issue raised by the Honourable Machang Bubuk regarding a study of the design of the junction where a fatal accident involving a school student occurred at Jalan Kampung Baru, Alma. For the Honourable Member's information, JKR will take up this proposal to re-study the junction mentioned, including upgrading the traffic of that road in the future so that such accidents can be avoided. The Honourable Sungai Acheh requested the extension of road widening at Kampung Kuyong for the comfort of residents in the area. He also requested the widening of Jalan Kampung Kuyong from Simpang Tiga to Sungai Acheh, which had been rejected in the 2022 Budget. In addition, the Honourable Member also requested that utility trench excavation works be properly re-patched because accidents often occur. For the Honourable Member's information, for the widening of Jalan Kampung Kuyong from Simpang Tiga to Sungai Acheh, the road widening work along the entire road requires a very large allocation. Therefore, JKR SPS has planned to upgrade the drains up to the road reserve edge and road shoulders in phases first, and then upgrade the road as well, also in phases. So for 2021, JKR Seberang Perai Selatan (SPS) upgraded the drains on that road over a length of 126 metres. In 2021, JKR SPS repaired the road structure on that road over a length of 400 metres. For the next phase, namely upgrading the drains on that road, JKR SPS will apply for development allocations in the following year until completion. So we will do it bit by bit. After that, the work to upgrade and widen that road will also be carried out in stages. As for the patching work following excavation work by the utility parties, JKR constantly monitors road conditions and if there are patches by utility parties that do not follow the specifications, JKR will immediately direct the utility parties concerned to repair them again promptly. Among the approaches JKR SPS undertakes is that first, we will send letters. Second, we have set up a WhatsApp group with the utility parties so that any complaints regarding patching work, if unsatisfactory, can be conveyed to the parties concerned promptly. If the Honourable Member has information about unsatisfactory work, you may also inform the District Engineer of JKR SPS or the Seberang Perai City Council (MBSP) and the State Government will take action.

The Honourable Permatang Berangan submitted a request to JKR to monitor road junctions that have a high risk of accidents, as follows: Tasek Gelugor Road junction; Lahar Yooi Road junction; Pokok Sena Road junction; Tasek Gelugor Pasar Malam Road junction; Tok Bedu Road junction; and Pongsu Seribu Road junction. For the Honourable Member's information, this is the feedback that I received from JKR. First, at the Tasek Gelugor Road junction, JKR Malaysia has already carried out a road forensic study recently. So based on the results of this forensic study, JKR Penang will apply for allocations for suitable improvements. For the Lahar Yooi Road junction, JKR needs to carry out Right of Way (ROW) survey work for the road and a traffic census study on the need to install traffic lights at that junction first, in order to ensure the need for installing traffic lights at that road junction. For the Pokok Sena junction and the Tasek Gelugor Pasar Malam Road junction, both need a traffic census study as well to ensure the need for installing traffic lights is the same. For the Tok Bedu Road junction, JKR has applied for allocations to carry out the prior survey work, while the application for allocations for traffic light installation work has already been submitted in the 2023 Budget. As for the Pongsu Seribu Road junction, similarly a prior traffic study needs to be carried out. Okay, Mr Deputy Speaker, I now move on to the issues of flood mitigation.

Azrul Mahathir bin AzizAMANAH · PHBayan Lepas

Mohon laluan.

Zairil Khir JohariDAP · PHTanjong BungaEN

Please proceed, Bayan Lepas.

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

Thank you. I only want certainty from YB. EXCO, because in my debate, I tried to press for the State Government to help, meaning we do not wait much longer for allocations from the Federal Government. From Alhamdulillah, there was a time when YB. EXCO placed top priority on resolving the congestion on that road. I only want to know, until when or is there a duration time for us to wait, and also when will the State Government take steps to prepare its own budget from MBPP or the State Government to implement it by itself? Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Bayan Lepas. Regarding the stretch that has been mentioned, the location that was mentioned by Bayan Lepas, I have actually also discussed it, and I will direct the JKR Southwest District (DBD) to look at it and make a rough cost estimate. What is needed, if the Federal Government, although this is a Federal Road and normally the Federal Government is responsible for upgrading that road. Nevertheless, we will try to look, especially we will look at the cost estimate, and if we can ease the situation somewhat by

carrying out upgrading in that area, we ask that it be considered. It is not that we have never done it; there are also cases in other areas where, if the upgrading can be carried out with State Government allocations, then we can consider it. So we will discuss this matter first, Honourable Bayan Lepas.

Yang Berhormat?

Zairil Khir JohariDAP · PHTanjong Bunga

Sila.

Thank you, Honourable Member. I only want some clarification regarding the congestion in Sungai Dua. There are already alternative options to be implemented to resolve this congestion, especially on the bypass roads, one-way roads. Second, alternative roads, and third, I think there is also a new road from Permatang Pasir. So how far has the development gone, because this matter still continues to cause congestion in the Sungai Dua area in the morning, evening and so on. So if possible, please expedite the time frame on when we can do it. If it is a one-way road, when can we resolve it? Second, regarding the drains along the roadside, most of the drains in the Sungai Dua area are rather small and need to be enlarged. Can we apply directly to JKR for them to build larger drains so that flash floods do not occur in the residential area, the villages on the left and right of the road?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Sungai Dua. Regarding drains, if they need to be upgraded, the Honourable Member may raise this matter with the parties that, what is it, are responsible. If it is a JKR road, then JKR can go directly to the District Engineer, and the District Engineer can bring it to my attention. If it is a village road, then it needs to be brought to the attention of the District Office. So, as I mentioned the other day during oral questions, MARRIS allocations can now also be used, not for upgrading but for what we call modification of drains due to flood issues. So, perhaps there is a possibility we can obtain some allocation to carry out modification of the drains that are needed, Honourable Member. Okay, regarding which one, road congestion. That one I will bring to attention, I am not sure about the location mentioned earlier. I need to do a check, Honourable Member. Flood Mitigation Plan (RTB), the Honourable Sungai Pinang raised the issue of the frequency of flash floods in the Sungai Pinang area. As the Honourable Members are aware, the Sungai Pinang Flood Mitigation Plan (RTB) project, which the people of the State of Penang have been waiting for, has still not started. And the Sungai Pinang RTB, which is a Federal project, the State Government really supports it and also wants to expedite it. However, the State Government also understands that there are several issues on site, including issues of land ownership and unauthorised structures in the Sungai Pinang reserve, which are also obstructing the implementation of this project. Nevertheless, the State Government is doing its utmost by assisting the Department of Irrigation and Drainage (JPS) to tackle these issues. For example, the State Government has officially written to JPS Malaysia to re-study the need for additional land acquisition involving resident settlements. The land acquisition process will involve payment of compensation to occupants at current market rates, and this will require very large allocations and a long period of time, and will consequently affect the implementation timeline of the project. Compensation payments to occupants will also cost very high and reduce the physical cost of the project. So, the State Government is of the view that this matter cannot be accepted. This project has been promised to the people for a long time, so we cannot delay it again due to issues such as land acquisition that has not been identified beforehand by JPS Malaysia. So the State Government also views that there are other options, if the wheel alignment as well as the pumping station and so on can be shifted slightly, that is among the options proposed by the State Government, so we can avoid additional land acquisition. These options have already been submitted to JPS Malaysia and we very much hope to receive a positive response, because if it can be considered, it will save compensation costs and, more importantly, save land acquisition time. And therefore, the project can start immediately. So we are waiting for feedback from JPS Malaysia on that. The Honourable Bagan Dalam asked about the RTB Sungai Nyior. For the Honourable Member's information, JPS Penang has made plans regarding flood events in the Sungai Nyior catchment area by re-calling the study tender for the RTB Sungai Nyiur in July 2022. The reason why the tender needs to be re-done is because there are new guidelines from JPS Malaysia. So it is a change in specifications: after the major flood last year, the Federal Government or JPS Malaysia has set a higher ARI for all flood mitigation projects, so the scope had to be amended to comply with several new conditions amended for the tender. So the Honourable Telok Bahang raised the issue of flood mitigation as well. For the Honourable Member's information, the problem of the major high tides that have occurred has been taken into account in the long-term planning for the RTB Telok Bahang, which is currently in the detailed design process by the consultant. Among the scope of this RTB is, first, upgrading work on the existing JPS drainage system. Second, installation of Flap Gates to control rainwater runoff and high sea water, and third, upgrading of the tidal control gate, namely a larger Tidal Control Gate. Solving the overall overflow of major high sea water in the housing estate area requires high costs, where the area is low-lying and requires the construction of an embankment along the mangrove forest area, in addition to the construction of a new drainage system controlled by the construction of a Tidal Control Gate. The Honourable Tuan Yang di-Pertua, I now move on to the issues of… (interruption).

Sebelum itu.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, Sungai Dua.

Firstly, I would like to thank the Drainage and Irrigation Department (JPS) which has resolved many issues in the Tasek Gelugor and Sungai Dua constituencies relating to irrigation, river drainage and so on, and has greatly helped in preventing floods. However, I request that, if possible, there be two or three more areas in Sungai Dua and Permatang Berangan which I feel require the implementation of flood mitigation projects (RTB). For RTB in the Tasek Gelugor area and the Sungai Dua area, there is none at all on the list for RTB implementation. If possible, a study should be carried out to see which areas require the implementation of the flood mitigation plan (Rancangan Tebatan Banjir) that was previously carried out, and I feel its effects were quite good. However, if more is added, it may produce even better effects and floods may decrease further. Much has already decreased in many areas of Tasek Gelugor, Lahar Yooi and Air Itam; floods have already decreased. In Permatang Berangan, it has decreased too. So, if possible, please review and carry out a rough study again for RTB in the Tasek Gelugor area, the Sungai Dua area and so on.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, the Honourable Member for Sungai Dua. As the Honourable Member for Sungai Dua also mentioned, in fact major RTB projects have already been implemented by the Federal Government previously, and if there is a need, we will look at any applications that can be made for RTB in those areas. Nevertheless, the State Government has taken the initiative to carry out a drainage master plan for every district, including in SPU, covering all the main areas in the district, every district. So from that we have information that can help in designing what is needed, Honourable Member. Okay, I now turn to issues related to transport. Among those who debated transport issues were the State Assemblymen for Berapit, Bayan Lepas, Telok Bahang and others. I thank those who are always attentive to public transport in Penang. As Honourable Members are aware, all public bus services owned by Kumpulan Prasarana and operated by Rapid Penang are free in the State of Penang. Currently, 50 routes are operated by Rapid Penang with 195 buses every day from 5.30 am to 11.30 pm throughout the State of Penang. By using the Pas Mutiara, all these buses can be boarded free of charge. I think there is no other state or city in this world, Honourable Mr Speaker, where all public transport is free for all its people; not only are buses free, ferries are free too. I think this is a major aid provided by the State Government, especially one that was started during the COVID pandemic to help the people. Sorry?

Deputy Speaker of the House

Penang Lead.

Zairil Khir JohariDAP · PHTanjong BungaEN

Penang Lead, of course, Tuan Yang di-Pertua. The State Government also agrees with the views and suggestions of the Honourable Member that more promotional plans should be implemented to promote this Pas Mutiara so that more people use buses and traffic congestion can be reduced. In this regard, the promotion of the Pas Mutiara and all State Government sponsored programmes such as free ferry fares and the free CAT Bridge bus programme will also be included in the PTMP promotional roadshow sessions that have been held for the past two weeks. For the information of the House, these roadshow sessions have been scheduled for six (6) months every Saturday and Sunday at 16 selected locations. It is hoped that with this effort, more members of the public will support and use public transport. Apart from that, the communications side has also started making TikTok videos and so on to promote this free Pas Mutiara. As for the BEST FIZ service raised by the Honourable Member for Berapit, the free CAT Bridge bus route actually passes through the FIZ areas, so BEST FIZ is no longer needed. However, the Honourable Member's suggestion to discuss with FREPENCA can be considered to study new routes. Establishing new routes directly to the FIZ must have an optimum ridership so that bus use is more efficient. Tuan Yang di-Pertua, Electric Vehicles (EVs) are increasingly receiving attention in Malaysia. According to the Malaysia Automotive Association, for the year 2021 only 274 EVs were registered compared with a total of 508,911 vehicles sold overall in Malaysia. Although EV uptake is still not encouraging, the provision of infrastructure to welcome EVs in Malaysia and also in Penang needs to be examined, because, Tuan Yang di-Pertua, it is like a chicken and egg situation. We want to buy EVs but if there is no place to charge them, that is also difficult. So who should do what first? Therefore, the State Government has taken the initiative to encourage the provision of charging infrastructure, charging stations for electric vehicles. For the information of the House, the State Government is studying this matter and wishes to encourage entrepreneurs or companies that are interested in installing electric charging points in Penang to do so at strategic locations frequented by the public. In addition, the State Government through MBPP (Penang Island City Council) has approved 9 locations for the installation of free electric motorcycle charging points in the State of Penang, namely six (6) locations in the North East District (DTL) and three (3) in the South West District (DBD). Additionally, I understand that MBSP (Seberang Perai City Council) will also do the same. So we have asked MBSP, and in principle there is no obstacle. The purpose of providing free charging stations for electric motorcycles is to encourage the public and e-hailing riders to use electric-powered motorcycles. This initiative is also in line with the Penang2030 Vision through Strategic Initiative D2: Strengthen Mobility, Connectivity and Digital Infrastructure. Yang Berhormat Tuan Yang di-Pertua, although the COVID-19 pandemic has had a negative impact on the national economy, Penang remains the leading state in terms of Gross Domestic Product (GDP) per capita, namely RM54,718 for the year 2020, which exceeds the national level of RM43,378, despite experiencing a contraction of 2.1% compared with the 5.6% contraction recorded at the national level. The continued positive growth of electrical and electronic products and optical products in the manufacturing sector, which remains outstanding in this State, has offset the rate of national economic contraction.

As an industrial state, Penang not only receives the impact of economic growth but also experiences increases in population density and the number of vehicles every year. Therefore, the Federal Government should reconsider and allocate appropriate funds to help the State of Penang so that we can together move towards becoming a developed nation. Public transport projects such as the Light Rail Transit (LRT) and the construction of new highways such as Pan Island Link 1 (PIL1) are large-scale infrastructure projects that would normally receive funding from the Federal Government. If we look at Selangor, they built LRT and MRT, all financed by the Federal Government. However, in Penang, every time we ask, we are unsuccessful. Three (3) times in a row the State Government has made applications through the Twelfth Malaysia Plan (RMKe-12), but it has not borne fruit. Moreover, the sovereign guarantee that was given by the Federal Government under Pakatan Harapan for financing the LRT project, as well as the soft loan from the ADB (Asian Development Bank), has been cancelled. Although there has been no positive response from the Federal Government, the State Government will continue to apply for allocations from the Federal Government through the Rolling Plan 3 (RP3) for the PIL 1 project, but now we are doing it in phases. If we want to do the whole PIL 1 project, it is indeed a big project costing billions of ringgit, but we are now focusing on Phase 1A of PIL 1, which will connect the Tun Dr. Lim Chong Eu junction to the Tun Dr. Awang junction. We have identified this alignment as a very critical alignment to disperse traffic in the Jalan Tengah, Jalan Sultan Azlan Shah and Jalan Tun Dr. Awang areas. So the allocation requested is RM1.6 billion through the Rolling Plan 3, and for the year 2023 the amount requested is RM425,000,000. Therefore, with the State Government's efforts to re-examine the method of implementing this PIL 1 project in phases, we hope the Federal Government can help the State Government and the people of the State of Penang, because if traffic congestion, especially in industrial areas, can be reduced, then the industry of the State of Penang can develop more progressively and contribute to the national GDP, and contribute to the taxes that can be received by the Federal Government. So it is actually a win-win situation; we also do not understand why the Federal Government cannot consider it. I hope our State Assemblymen from the Federal Government side can raise this issue, bring this issue to the attention of their Ministers, especially the State Assemblyman for Seberang Jaya who works at the Ministry of MITI (Ministry of International Trade and Industry), take it to his boss. Yang Berhormat Tuan Yang di-Pertua, I think the issues concerning water supply in SPS were already answered by me during the oral question session this morning, and a press conference will also be held tomorrow. I also invite the State Assemblyman for Jawi, together with Tuan Yang di-Pertua himself, to participate in issues of water in SPS. Okay, so there is an electricity issue. Earlier there was water, now there is also electricity. The electrical energy issue raised by the Honourable Member for Berapit is just one issue, namely electricity disruption in the areas of Bukit Mertajam, Kampung Baru Taman B, Taman Jernih and also his own Service Centre, oh dear! Honourable Member, this we will bring to the attention of TNB. TNB constantly monitors the electricity supply system to ensure it is stable and continuous. A total of six (6) system strengthening projects have already been planned in this area. Once the PPU Soon Ban Khin is in service, but we have to wait first. I understand this PPU will be completed and can be started early next year. The total cost of this system strengthening project is RM29.9 million. While this project is being completed, TNB will continue carrying out inspection and maintenance activities on the electrical installations involved. The last maintenance before this was fully completed on 28 December 2021, and follow-up maintenance activities have been carried out again and are expected to be completed before the end of July 2022. Honourable Member, the last issue is telecommunications infrastructure. The Honourable Member for Batu Lancang and the Honourable Member for Permatang Pasir raised the matter of 5G. For the information of the Honourable Member, the State Government together with Digital Nasional Berhad (DNB) has begun 5G implementation work in Penang. Five (5) locations have been selected as pilot projects in the George Town Heritage area. This year, apart from that, a total of 151 locations, including the projects in those five (5) George Town areas, have been identified on the island. However, the delay is due to some squabbling between the telecommunications service providers and DNB. That is something that has delayed the implementation of 5G in Malaysia, which should have started this year. Nevertheless, the State Government of Penang is very committed to facilitating the implementation of 5G; the Smart Street Pole Guidelines have also been prepared. We have finalised them. Everything is already ready on the part of the State Government of Penang. We very much welcome it, but the one causing the delay is the Federal Government. Nevertheless, in conjunction with the holding of the World Congress on Innovation & Technology (WCIT), there is a new name, actually I have forgotten it, WCIT 2022, we will ensure, and DNB has also given an assurance that 5G will be available in Penang by September 2022. The Honourable Member for Sungai Dua, the Honourable Member for Permatang Berangan and also the Honourable Member for Machang Bubuk raised internet coverage in outlying and rural areas. For the information of all Honourable Members, as of December 2021, 4G coverage throughout the State of Penang has reached 99.82%. This exceeds the national target under the JENDELA Initiative of 96.9%. The State Government has indeed placed important emphasis on telecommunications facilities. This is proven when the State of Penang became the first state in Malaysia to recognise telecommunications facilities as the third utility after electricity and water. At present, the focus of the State Government is to improve internet coverage in outlying areas and areas that have communication coverage problems. The State Government is also working together with the Ministry of Communications and Multimedia Malaysia (KKMM) and also MCMC in implementing several initiatives to upgrade communication coverage. Firstly, the installation of fixed broadband lines. As of December 2021, a total of 182,251 premises have completed the installation of 25 fixed broadband lines throughout the State of Penang. The target for the end of 2022 is 283,989 premises. So for this year, it is expected that an additional 100,000 will be completed and installed; Secondly, the installation of mobile broadband. This installation involves the construction of new telecommunications structures for the purpose of mobile broadband, mobile broad band, just now fixed broad band, this one is mobile broad band. As of now, 99 new site locations have been implemented throughout the State of Penang. This effort will continue in the implementation of JENDELA Phase 2 starting next year; Thirdly, upgrading existing transmission stations. The work involved is upgrading existing transmission stations so that telecommunications coverage can be improved. As of now, a total of 1,715 transmission stations have been completed upgrading; Fourthly, the Rural Optical Fibre Infrastructure Hub Provision Project in areas near schools and industrial areas (Point of Presence – POP). The POP project is an initiative of the Ministry of Communications and Multimedia Malaysia (KKMM) to upgrade internet coverage in rural areas. For Phase 1 implementation, there are eight (8) schools and one industrial area involved, namely:

i. Sekolah Kebangsaan Bumbung Lima, Kepala Batas; ii. Sekolah Kebangsaan Lahar Kepar, Kepala Batas; iii. Sekolah Jenis Kebangsaan (Cina) Nung Min, Kepala Batas; iv. Sekolah Jenis Kebangsaan (Tamil) Palaniandy; v. Sekolah Menengah Kebangsaan Sungai Acheh, Nibong Tebal; vi. Sekolah Kebangsaan Permatang Sintok, Penaga; vii. Sekolah Jenis Kebangsaan (Cina) Sin Chung, Penaga; viii. Sekolah Kebangsaan Pulau Aman, Simpang Ampat; and ix. Penang Science Park. So this is under the KKMM project where internet coverage will be upgraded in those areas; Fifthly, implementation of the Penang Connectivity Masterplan (PCMP). The PCMP was launched in 2019 with the aim of ensuring the availability of telecommunications infrastructure in Penang to face the challenges of the 21st century world. For this one, we also have projects that have been identified and are being implemented. So far, 50 per cent of these projects have been completed. The last, the sixth, is the establishment of Community Internet Centres. A total of 41 PIK, or Community Internet Centres, have been planned to be set up in the State of Penang. So far, three (3) locations have been established, namely in the Sungai Pinang area, Balik Pulau, Taman Prestij, Balik Pulau and Taman Gelugor Indah, North Seberang Perai. At this time MCMC is also in the process of establishing another 38 PIK throughout the State of Penang. The focus of these PIK is on outlying areas and B40 areas. Yang Berhormat Kebun Bunga… (interruption).

Lee Khai LoonPKR · PHMachang BubukEN

Request clarification, Tanjong Bunga.

Zairil Khir JohariDAP · PHTanjong BungaEN

Oh, yes, Machang Bubuk.

Lee Khai LoonPKR · PHMachang BubukEN

Thank you, Tanjong Bunga, for touching on telecommunications, especially broadband, and I very much welcome all the efforts made by the State Government to ensure the digital divide can be reduced. However, I would like, perhaps later, a written reply to be prepared on where, just now, it was mentioned that there are many areas with fixed broadband and many housing units have been installed, as well as mobile broadband. Can we also know whether flats and high-rise apartments occupied by the B40 group also have broadband provided in those areas? Can the State Government specifically allocate PIK for the areas I just mentioned, namely the B40 high-rise buildings?

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, thank you for the suggestion. I will forward it and discuss it with MCMC. Apart from the outlying areas, perhaps the urban areas that the Honourable Member is referring to can also be considered, both for fixed broadband, and what, indeed we want complete, comprehensive coverage. So, especially for high-rise buildings, it is actually easier for them to install fibre. So if the Honourable Member knows of buildings that have not yet been installed with fixed broadband, the Honourable Member can highlight them to me and I will ensure those areas receive the facility. We certainly want to ensure that all populated areas in the State of Penang have access to broadband internet.

Azrul Mahathir bin AzizAMANAH · PHBayan Lepas

Mohon pencerahan.

Zairil Khir JohariDAP · PHTanjong Bunga

Oh, ya.

Azrul Mahathir bn AzizAMANAH · PHBayan LepasEN

A question that I find rather confusing: one concerning the figure which says internet coverage is already more than 90 per cent, if I am not mistaken. Another thing I think is how we calculate mobile internet coverage, whether it already has coverage or not, since we have various operators. Sometimes I call, Digi has none, Digi has, U-Moble has none. So if one operator already has internet and the others do not, is it counted as covered? So or how, can YB give clarification.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member, a good question. For this one I also need an explanation from the Malaysian Communications and Multimedia Commission (MCMC). What I can state here is that these statistics we obtained from MCMC, actually from their system. A good question, whether when we say there is coverage it means there is coverage for all networks or only some networks. That I will check and give an answer to the Honourable Member. I too want to know, actually. I think lastly there was a proposal from the Honourable Member for Kebun Bunga to establish an internet exchange in the State of Penang. I think that is a good proposal, and it is actually being considered by Digital Penang, a State Government agency tasked with developing the digital economy sector. So with that, Mr Speaker, I thank all the ADUN-ADUN who have been involved and raised issues, and I hope we can work together, all the Honourable Members here and also government agencies, whether State Government or Federal Government, for the welfare of the community together with the people of Penang State in particular. So with that, I thank you and respectfully move to support.

Deputy Speaker of the HouseEN

Thank you, Tanjong Bunga. Water is the pririoty. Honourable Members, the meeting is adjourned and the House will sit again on Thursday, 2 June, at 9.30 a.m. Thank you.

The House was adjourned at 6.40 p.m.