Pulau Pinang · 2 June 2022
14th Assembly, 5th session, 1st meeting · 354 turns · 42,114 words · official PDF ↗
ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.
Absent: Dato' Haji Abdul Halim Bin Haji Hussain (Batu Maung), Haji Mohd Tuah Bin Ismail (Pulau Betong), Zulkifli Bin Ibrahim (Sungai Acheh), Khaliq Mehtab Bin Mohd Ishaq (Bertam)
(Opening)
Honourable Members, Mr Speaker of the State Legislative Assembly. Recitation of prayer.
“Bacaan Doa”
Soalan lisan.
Honourable Members, we now continue with the Oral Questions session and I would like to invite the Honourable Member for Bagan Dalam.
Thank you Dato' Speaker, my question is question number 34. No. 34. Is the report on the accident involving the Hawk108 aircraft at Butterworth Air Base in November 2021 sent/referred to the State Government? (a) Will the State Government discuss with the Ministry of Defence (MINDEF) regarding the activities of the Hawk aircraft in the high-density Butterworth area and their impact on residents' safety, referring to the history of incidents involving the aircraft?
Yes, EXCO to answer?
Thank you Mr Speaker. Actually, when I first saw this question I thought the Honourable Member for Bagan Dalam had a question about the film Top Gun, but when I looked, in Top Gun the aircraft is the F18 Super Hornet, whereas here it is the Hawk108. Honourable Member for Bagan Dalam, actually the flying activities of Hawk aircraft or any other aircraft belonging to the Royal Malaysian Air Force (TUDM) in Penang involve security issues under the Ministry of Defence (MINDEF). So far, there has been no discussion by the State Government regarding any activity or location of the TUDM Air Base, and regarding the Honourable Member for Bagan Dalam's question about the accident involving the Hawk108 aircraft, the State Government has not received any report on the matter. Thank you.
Supplementary question. Dato' Speaker, when we talk about security issues, especially national security, purchases of military assets and so on, we cannot dispute or question them, but what I saw regarding the incident on that day is that I myself saw the Hawk aircraft during training that day flying lower than usual, and we can see that since 1996, 9 Hawk aircraft crash incidents have been reported. The first was in Butterworth and the latest, which also happened last year, was also in Butterworth. I understand that national security matters mean the Federal Government does not give information to the State Government and so on, but when it involves high-density areas such as Butterworth, which is surrounded by Sungai Dua and Telok Ayer Tawar, all of which are high-density, we want to know whether reports like this have been sent to the State Government. They should have been sent to the State Government because it also involves residents' safety when it comes to incidents, so what is the position? Will the State Government ask for a report from the Federal Government or MINDEF to discuss whether this aircraft will remain in service or be stopped? Thank you.
Thank you Honourable Member. The State Government has noted this matter. That's all.
Thank you, and I can suggest that later we bring this matter to the Member of Parliament for Bagan to raise in Parliament. There must be an answer. And next I would like to invite the Honourable Member for Jawi.
Thank you Dato' Speaker. My question is question number 35. No. 35. The State of Penang always cares about the welfare of the people. State the number of RMM A, B and C units built since Pakatan Harapan has administered the State Government. (a) Has the Federal Government fulfilled its promise to build various RMM in Penang? (b) If so, where and when will the RMM be built?
Good morning and greetings. Thank you to Dato' Speaker, and to the Member for Jawi for this very important question…(disturbance).
Honourable Member, wait a moment. I will interject briefly. I think Tuan Yang Terutama Tun has already answered this question somewhat on behalf of EXCO, so. If possible, please shorten it. Page 16 of the T.Y.T. Speech Text also has an answer.
T.Y.T. has already answered for me. I extend my thousand thanks to T.Y.T.
So honored.
So, I will just give a little commentary and the latest status regarding the construction of the State Government's Rumah Mampu Milik in Penang and our promise. Indeed, since 2008 until now the number promised has been 76,00 more, but up to now, based on the Penang Vision 2030 which looks at a target of 220,000 units, we have achieved 136,330, Dato' Speaker. The details are that the completed units built number 45,900, while those in the construction phase are 18,354 and the remaining 72,076 units are in planning, Dato' Speaker. So we indeed have an agenda for providing affordable housing, but it also needs assistance from the Central Government because we in the State of Penang are one of the largest contributors of tax across the whole of Malaysia, and according to our record, just for information Dato' Speaker, of the RMM or Rumah Mampu Milik that have been built, 12 percent of all that have been built in Penang through its agencies. Various agencies are in the answer Dato' Speaker, I don't want to say all that, but that is the factual situation at the moment, around 12.8 percent has been contributed, then we thanked them, we thank them and we hope the others can also be continued because we have waited so long. For the information of Dato' Speaker, we also have several projects that we are waiting for from them which we have approved, such as the PR1MA Project in Gelugor, Kampung Kastam, to be exact it is Kampung Kastam, where we hope it can be continued as quickly as possible. In fact the Chief Minister has even attended there to launch it last year, and we hope it can be continued as quickly as possible. So I think this is what I wanted to inform, I don't want to say too much about this issue as I think many have already realised what I say every day. Thank you very much.
Dato' Speaker, supplementary question. As the Datok Keramat just said, indeed the State Government has approved a project for the Federal Government. Can I obtain more information on whether the State Government has ever identified plots of land for the Federal Government so that they can build RMM homes for the people of Penang? And the next question is: with the increase in inflation across the world, it has caused an increase in the prices of construction materials. Will this cause the cost of building affordable housing to increase, and is there a possibility of price coordination for the various RMM in the State of Penang taking place? Thank you.
Thank you to my colleague from Jawi for this very important supplementary question, anything very related, I might as well respond to this now rather than go on with what everyone already knows. Two things. The first concerns what we have already done: we are still waiting for the Central side to help us, as I stated, and the earlier question was whether we have already helped them in terms of providing land and so on. For everyone's information, my colleagues here in all five districts of Penang have indeed identified five (5) plots of land in each of those districts for them to come to Penang to see whether they can build PPR (Projek Perumahan Rakyat), and also whether we propose RMM now on that land if possible. In fact, our Honourable Member from Sungai Pinang has already stated in his statement yesterday what happened: one of his lands is in Kota Giam, which is on the island, in Dato' Speaker's North East District. Actually, before the political upheaval occurred, they had indeed come down from the Ministry of Housing and Local Government (KPKT) to look and check, but after that everything stopped. So we want to see what our direction is. We are ready with land not just on one (1) site but on five (5). So that is indeed on our agenda, there's no issue about that. Of course, the other issue raised by my colleague from Jawi is very important. In the current economic situation, all developers already have a lot of pressure in terms of rising material prices, number one, their workers' wages, don't even talk about wages, the workers are also not there. They have gone home and cannot come back, and when they go home we are looking at more than 50 percent increase across the board, Dato' Speaker. For all these things, and that has a very very major impact…(with permission), on the construction of affordable housing also. So that is the reason why we have come out with our home ownership campaign, and we in Penang are the first state to continue it until the end of this year. The Central Government has already stopped it last year. But we will not. Because of this, we see it as one way we can facilitate and help them to ensure there is distribution of affordable housing to the people. So we will continue with that and we will continue to monitor…(with permission), Dato' Speaker, if necessary we will look at it. In the ownership campaign, Dato' Speaker, what happens is we give incentives, many incentives, to developers, because this is necessary, especially for affordable housing developers, because it will ultimately be given to the people and citizens of Penang. That concludes, thank you.
Thank you, I would like to invite Batu Uban.
Dato' Speaker, my question is number 36. No. 36. State the total number of Taska, Tadika and elderly care centres registered in Penang by district. (a) How many of these centres operate with and without licences?
(b) What steps have been taken to license them? (c) Does the State Government monitor these centres?
Thank you Dato' Speaker and also YB Batu Uban. The Batu Uban question is "How many taska, tadika and elderly care centres operate with and without licences", yes. Okay, the answer is that the number of taska in the state is 123 in total. Those with licences are 123. Unlicensed taska number 45. Licensed tadika 461. Unlicensed 86. Licensed elderly care centres 28. Unlicensed 56. More unlicensed. So part (B), "What steps have been taken to license them". Many steps have indeed been taken, have been undertaken. Mainly giving leniency in terms of the change-of-conditions fee payment. And many more. So we already have a new condition, and we are carrying out advocacy and giving advisory services to unregistered operators. Holding briefing sessions and dialogue sessions with operators to explain the registration process and also the new conditions that have been relaxed, and thirdly. And fourthly, carrying out consultation sessions to identify and help operators to register. We invite them and hold sessions to find out what the problem is and give advice one by one, but there are still some who do not come forward. Some cannot be regularised because they are in the wrong zone and so on. And thirdly, question (C), "Does the State Government monitor these centres?" The State Government, through the Penang State Social Welfare Department (JKM) and the State Education Department (JPN), constantly carries out periodic monitoring of taska. JKM covers taska. For tadika under JPN, whether registered or not, they monitor. This is to ensure operators register their operations promptly and to monitor the Act, regulations and conditions set for operation. Reminder notices are also issued to unregistered operators. In addition, JKM also ensures self-assessment is carried out by JPWE operators through the MyKenari system. That's all. Thank you.
Supplementary question. Thank you YB Padang Lalang for the information given, and I want to ask: although we have made the conditions for registration or the regularisation process for those without licences easier, there are still some who are stubborn. So what action will the State Government take? Will we close these premises, because it involves safety issues? Because we know, if they do not comply with this licence, it involves safety issues such as if a fire occurs. And also recently, when there was COVID at my place, there was a care centre that was not registered, so it was not registered as a recipient of the vaccine for elderly people, and eventually a cluster occurred at that elderly care centre. Will we take firm action? My second question: now we understand that on social media there is a hot issue, namely cases of child abuse at centres, and also death cases involving childcare centres and so on. So I want to ask what efforts and also steps the State Government will take going forward so that we can tackle this issue or problem so that it does not happen in Penang? Thank you.
Terima kasih.
Thank you to the Honourable Member for the supplementary question, yes. We certainly remain focused on safety because safety is very important. But at the same time, we also face a shortage of services or care, care centres, whether for children or the elderly. And this is not the same as goods. If it's goods, we take action. We take their goods. But here we cannot take babies, children or old people, where would we put them? That is why we use an approach that is truly not just gentle, but we advise, and we are also firm if it is in the wrong zone. Wrong zones must definitely close. So we do advise closure. But we must also ensure their customers have a place to look after them. We will try, yes, we will try. The State Government has tried to organise more centres like this. Therefore, we allocate RM300,000.00 a year for a period of three (3) years, that is until 2023, for grants to upgrade taska or child care centres. For the first quarter of this year, the State Government has approved grant applications from 11 taska or PJKK (Pusat Jagaan Kanak-kanak) totalling RM194,000.00. This grant is intended to help ease the financial burden of taska or PJKK operators in improving the quality of their services. Many see this service as a business, but I see it as a social service. Because the government, to this day, whether Federal or State, cannot afford to establish services like this. So we rely on the private sector, or there are many NGOs also who provide these services at very low fees or even without payment. So I think we should view it as a social service. We should give whatever assistance we can to facilitate them in establishing services like this. Also, to improve the skills and teaching techniques of pre-school teachers, Whytehouse Education Group Sdn. Bhd. has developed an online learning platform, namely pre-school educator.com. This one I think the Honourable Member for Bagan Dalam may pay close attention to, because Bagan Dalam has just recently got a baby boy. Yesterday. Congratulations.
Thank you.
The knowledge inside this is for new parents….(disturbance).
Padang Lalang, please focus on the supplementary question only.
Yes, yes. I think in care, whether it is done by humans. Accidents will happen. We want all operators to take every measure to ensure the safety of babies or children and also the elderly. But accidents will happen. So I hope we do not just focus on accidents, because this will cause many operators not to want to run their business due to the very heavy responsibility. That is why we also encourage housewives to look after children at home, taska at home. But many refuse because they feel the responsibility is so great. Therefore, I hope we all understand that accidents will happen, but we want to make sure that all precautions have been taken, and if accidents still happen, we should also understand. Thank you.
Terima kasih.
Supplementary question. (disturbance)
I give the floor to the Leader of the Opposition.
Thank you Dato' Speaker.
Minta ruang.
I simply want to seek confirmation and have it recorded. Elderly care centres. I saw it earlier. Many are unlicensed. More are unlicensed than licensed. Over 20 and 56. So these are places mostly run by private parties and NGOs, and sometimes this burdens those who cannot afford it. We discussed this the other day. I just want to ask the Padang Lalang side, whether or not, for 2023 we can hold a discussion to include in an allocation application or project proposal, to establish with the Jabatan Kebajikan Masyarakat (JKM) or the State Government, or the Majlis Agama Islam (Islamic Religious Council), that we set up many more affordable elderly care centres that can solve the shortage of places. Can we include my question? I propose we include it in our planning list to establish them. Thank you.
I cannot answer whether it is possible or not, but I will strive to make it possible. Thank you.
Terima kasih.
I request the floor, because I feel this is an important issue…(interruption).
Honourable Member, this is the oral question session. This issue has already been answered, and I advise the Honourable Member that perhaps sometimes you come across a topic that the Honourable Member particularly likes. I ask that during the debate session you try to bring up issues like this. Do not keep repeating only the ones you jump into.
No. No, I did not mean that. Because the EXCO for Health did not have time to wind up the health issue.
Nanti. Nanti.
So I want to ask about HFMD involving childcare centres and kindergartens in Pulau Pinang, involving this spread…(interruption).
Enough. Enough. I invite the next Honourable Member. Permatang Berangan.
Thank you to the Honourable Dato' Yang di-Pertua. My question is number 37. No. 37. Maintenance of State Roads and Federal Roads. (a) I request the State Government to list the roads under State Government maintenance and the roads under Federal Government maintenance around the SPU district. (b) State the annual expenditure on state road management by district. (c) List the state road areas that have not yet, are currently, and have been maintained for the latest two (2) years.
Thank you, Dato' Yang di-Pertua. And thank you, Honourable Permatang Berangan. Honourable Member, the maintenance work on State Roads and Federal Roads, the list of roads under State Government maintenance and the roads under Federal Government maintenance in the SPU district, is as in Appendix A, which will be placed on the Honourable Member's table because it is long. For the second question, the annual expenditure for state road management by district is as follows. For the Timur Laut district (RM1,400.000.00), for the Barat Daya district (RM2,925,000.000), for the SPU district (RM1,580,000.00), for the SPT district (RM9,200,000.00), and for SPS (RM600,000.00), the total is RM15,705,000.00. Generally, Honourable Member, road maintenance work is carried out based on the current condition of the road and on road priority. The maintenance work to be carried out depends on the level of damage to the road and is subject to the annual allocation approved by the State Government. The list of road maintenance works that have been completed in 2021 and roads under maintenance work in 2022 is as in Appendix B, which will also be given to the Honourable Member. Thank you.
Supplementary question, thank you Honourable Dato' Yang di-Pertua, thank you Honourable Tanjung Bunga for the answer to question no. 37. As we know, roads are infrastructure, and good roads can reduce the risk of accidents and smooth daily traffic flow. My supplementary question is this: are the costs of state road maintenance tied only to the state infrastructure allocation, and apart from the additional allocation from MARRIS, what other funding sources can cover the expenditure for such management? The second question refers to the answer to my oral question no. 11. As of 30 April this year, the total MARRIS allocation received is RM75,353,610.00, and of that amount, how much has been spent solely on road maintenance for this year? Thank you.
For the second question, the specific one, I have to obtain the information and will give it to the Honourable Member. For the first question, in general, MARRIS and the state allocation are the two main sources of allocation for road maintenance. In fact, the MARRIS allocation is sufficient, especially since it has increased over the years, and if there is any maintenance that needs to be done, we can apply through the MARRIS allocation. Thank you, Dato' Yang di-Pertua.
Supplementary question, Dato' Yang di-Pertua. Speaking about this road, before I ask my question, I want to extend congratulations and thanks to the Honourable Tanjong Bunga and the State Government for naming a road in my area to honour the football legend of the state and nation, Datuk M. Kuppan. Thank you.
Dato' Yang di-Pertua, my question concerns federal roads in SPU. As my colleague from Permatang Berangan asked, we see that even though there is MARRIS allocation and also assistance from State allocation, federal roads still are not maintained properly, and there are weaknesses. For example, in my area, Jalan Bagan Luar, a main road, has damage: damage to drain covers and road shoulders has existed there for more than 2 years…(with permission), but when referred to the JKR, the State JKR (Public Works Department) cannot do anything because there is no allocation and it must be referred to the Federal Government, and the Federal Government takes a long time, so it still has not been resolved until now. And they must refer to the Member of Parliament's fund, RM130,000.00. I say, I do not agree with this. RM130,000.00 could be used to build a surau, or a temple, or a tokong, which is more useful than the Member of Parliament's fund. So how do we solve this problem, where the Federal Government apparently does not provide sufficient funds for the repair of federal roads and related damage on federal roads? I ask the Honourable Tanjung Bunga.
Thank you, Honourable Member. This too I think needs to be brought to the attention of the Ministers in Parliament, and I completely agree with the Honourable Member. Whenever we have complaints, especially on federal roads, it takes a long time to get repairs. For these federal roads, the Federal Government has in fact appointed concessionaires to carry out maintenance, but within the concession company there is a scope, and if there is work outside that scope, that becomes a problem. Sometimes in emergency situations we also apply for emergency allocation from the JKR Malaysia, and sometimes it is approved, but in terms of effectiveness it is a bit lacking. We hope the Federal Government can give more attention. I also want to add that the State Government attempted, perhaps in early 2019, to apply to the Federal Government to take over certain federal roads in the State of Pulau Pinang. However, in 2020, I received feedback from the Honourable Minister of Public Works after the change of government that the application had been rejected. Thank you, Honourable Member.
Next, I would like to invite questions from the Honourable Pulau Betong. Pulau Betong is not in the Chamber, so the question is skipped. I invite the Honourable Telok Ayer Tawar.
Thank you, Dato' Yang di-Pertua. My question is question number 39. No. 39. State in detail the State Government's initiatives in efforts to encourage increased agricultural yields of smallholders. (a) State the agricultural areas with potential to be cultivated within the Telok Ayer Tawar State Assembly constituency (DUN).
Terima kasih.
Bismillahirrahmanirrahim, Assalamualaikum Warahmatullahi Wabarakatuh, and good morning. The State Government strongly encourages farmers to increase agricultural yields, especially smallholders. Among the State Government's initiatives to increase agricultural yields are the following. First, providing techno-agriculture extension services by implementing agricultural extension through technology transfer along the value chain, with technical courses for farmers, as well as model farms set up to serve as guides for farmers. Second, implementing a group strengthening programme with emphasis on paddy cultivation, which is a community crop, to ensure agricultural activities are carried out in an integrated manner and contribute to collective yield increases. For example, in my earlier oral answer I mentioned that we, what is this, this programme called smart sawah, actually involves farmers' cooperatives themselves, and for example we see at PPK and others, because if they do sawah individually, for example, it is very difficult. Now, the technologies used, for example the idea of padi care using a soil diagnostics kit, where soil nutrient content for paddy fields, for example, can simply be taken and held. If we go and see at Kampung Terus, they just hold it, just take the soil, and then can print right there. It's a hand-held diagnostic soil detector that can give results immediately…(interruption).
Honourable Member, to save time, could you explain how that technology operates?
No, this is because the question concerns how to increase the yield of smallholder farmers.
Focus on that.
Yes, I want to explain what is happening now: the technologies that can be used to increase yields, meaning information about nutrients and so on, that can even reach smallholders now, young people like I mentioned who do fertigation of cucumber and fertigation of chilli, using these technologies with IoT, and it goes to the phone, the smartphone developed by young people in the village.
Okay, next is the implementation of Malaysian Good Agricultural Practice (myGAP). The State Government has also offered the Farmer to Farmer Programme to communities across Pulau Pinang. This programme also gives opportunities to people interested in agriculture even while working in other sectors. For 2021, 11 communities succeeded in this programme and obtained results. Among these communities are: in Seberang Perai Utara, MPKK Bumbung Lima and CCRS Kampung Selamat, meaning those who are in drug rehabilitation centres also did a Farmer to Farmer project, which we set up for them; in Seberang Perai Tengah, MPKK Tun Sardon, MPKK Mengkuang Titi, MPKK Jalan Tenggiri, MPKK Kampung Terus and MPKK Bukit Minyak; in Seberang Perai Selatan, MPKK Sungai Duri; in Barat Daya and Timur Laut, MPKK Permatang Pasir, MPKK Sungai Rusa and Unit Nelayan Tg Tokong, where we built a greenhouse. This programme has helped people in Pulau Pinang increase their income, and the Farmer to Farmer Programme will continue this year. When we started the Farmer to Farmer Programme, just to explain, the people who become Farmer to Farmer are not originally farmers. They are people who studied accounting, people who work in factories…(interruption).
Honourable Member, again, it is not necessary.
Okay, okay, I will continue. In 2022, the Department of Agriculture planned to implement 75 Urban Agriculture Projects. The breakdown of these projects comprises eight (8) individual projects, 25 community projects, 31 school projects, eight (8) institutional projects and three (3) technology transfer projects, implemented in all districts in the State of Pulau Pinang. The breakdown of Urban Agriculture Projects by KADUN (State Assembly constituency) is as follows: Seberang Perai Utara: Penaga has 3 projects, Bertam 3, Pinang Tunggal 3, Telok Ayer Tawar 2, Permatang Berangan 2; Seberang Perai Tengah: Seberang Jaya 5, Penanti 4, Bukit Tengah 3, Padang Lalang 1; Seberang Perai Selatan: Jawi 7, Sungai Acheh 8, Sungai Bakap 4; Barat Daya: Teluk Bahang 6, Pulau Betong 6, Bayan Lepas 1, Batu Maung 2; and Timur Laut: Tanjung Bungah 1, Air Putih 2, Datok Keramat 4, Padang Kota 1, Air Itam 1, Pantai Jerejak 1, Pulau Tikus 1, Batu Lancang 2, Sungai Pinang 2. Total in 2022: 75 urban agriculture projects. Among the agricultural areas with potential to be cultivated, especially paddy cultivation towards increasing paddy yield to 10 tonnes per hectare, within the Telok Ayer Tawar DUN are Permatang Panjang, Permatang Binjai, Gelong Bubu, Pekan Darat and Telok Ayer Tawar. In addition, urban agriculture, community agriculture and agro-based industries also have potential to be developed around the Telok Ayer Tawar DUN. Details of communities are in the appendix for each DUN in the oral answer. Thank you.
Thank you.
Supplementary question, thank you Dato' Yang di-Pertua. I observed what was answered by the Penanti side. The duties carried out by the Department are the same. Technical extension and group strengthening have indeed been implemented; what I have just seen is in terms of urban agriculture and also Farmer to Farmer. What I want to question is this: in our effort to ensure Pulau Pinang has food security, we must increase these efforts, because the State Government of Pulau Pinang has little land. So we must increase these efforts, focusing on urban agriculture enterprises and Farmer to Farmer, especially in areas without land. In the Teluk Ayer Tawar area, there is not much paddy field land, only village housing estates beside Pekan Darat. If possible, we want to help. I ask for views or an answer from the Penanti side on whether we can increase these efforts with more advanced technology, including aquatic livestock farming. We can make a concept like this. I have been speaking for a long time already. We want to do hectare equivalent, meaning like urban agriculture. We make a community urban plantation; we pick a village. The village makes a community of chives, for example. Each house grows chives. If 20 houses grow chives, there is marketing, sold domestically. So we can solve food issues, the price of goods and so on.
Dato' Berhormat, have you finished?
Terima kasih.
Our Farmer to Farmer, the technology we use does not necessarily require planting in soil, because now we set up fertigation, which is in fact like in paddy fields, we place it on top, meaning in flood-prone areas. In flat areas, the developer lays stones, so planting is not fertile, but fertigation projects can still be done because all the plants are placed in polybags. We also use abandoned buildings in halls, for example, and where there is no hall, we have mobile mushrooms, what is this, mobile mushroom or cendawan, with which the Penang Department of Agriculture won first place for the innovation award. So it looks like a house but is actually mobile, and we use abandoned halls like those to place blocks. For example, 21,000 mushroom blocks. Also, last year we gave vertical farms to households living in flats without land, so they can plant. We gave them to 250 B40 as a trial, to make vertical farms at home. And also to 850 B40 for those who have small gardens; that one is for individuals, while Farmer to Farmer involves communities. We also have a community and sustainable fish farming project: 50 ponds, with 5 communities learning how to do fish farming without pollution. Together with the plantation, we also have at Permatang Pauh Agro Park an aquaponics project, where under it is fish and above it are vegetable beds.
Thank you. I invite Seri Delima. Please.
Thank you, Dato' Speaker. My question is question number 40. No. 40. The shortage of parking areas around apartment residences such as at Greenlane Heights and Taman Tun Sardon requires the attention of the State Government. (a) What short-term and long-term actions will the State Government take to resolve this issue?
Thank you, Dato' Speaker, and to my friend from Seri Delima regarding the question on parking congestion and so on in his area. For the information of the House, the residential areas of Greenlane Heights Apartments and Taman Tun Sardon have very high population density, where most residents own vehicles of their own, such as cars or motorcycles. Furthermore, the space around these housing areas is limited to accommodate all residents' vehicles. For the Greenlane Heights area, the management is appropriately, in accordance with the law, namely the Strata Management Act 757 (Akta 757, Pengurusan Strata). The strata management may, first, establish suitable rules to control the number of vehicles that may enter their apartment area, or second, add more parking bays in areas that appear suitable on their premises. And then, for the Taman Tun Sardon area, we have actually implemented several actions as follows, namely short-term actions, which are repainting the parking bay lines. Second, adding parking bays in suitable surrounding areas. Third, inspecting and removing derelict vehicles parked in the parking areas. For long-term actions, we will establish house rules on parking bays, whereby one house has only one parking bay, and build boom gates and access control for the residential area. That is all, Dato' Speaker.
Thank you. I now wish to proceed to the question from the Honourable Member for Bertam. The Honourable Member for Bertam is not in the House. The question may be skipped. I invite the Honourable Member for Penaga. Please proceed.
Thank you, Mr Speaker. Penaga question number 42. Requesting the EXCO to summarise the reply. No. 42. Starting January 2022, enforcement action against pig farmers is taken in accordance with the Enakmen Penternakan Sabi 2016. (a) How many pig farms have been closed for violating this law, by state assembly constituency (DUN)?
(b) If not closed, what is the reason? (c) How many modern closed-system pig farms have been completed?
Honourable Member, please summarise.
Yes, yes, be brief.
Look how good you are, Honourable Member.
Okay, okay. Based on the decision of the State Government Council (Mesyuarat Majlis Kerajaan Negeri) Meeting No. 5/2022 dated 23 February 2022, pig farms that fail to comply with the farming licence and do not carry out improvement works will be compounded until 31 May 2022. Based on the records of the Veterinary Department (JPV), a total of 54 compounds have been issued, while 24 pig farms are in the process of closing voluntarily. In addition, one farm has been closed and one farm has been vacated. If farms that have been compounded still fail to comply with the pig farming licence, closure notices will be issued to the farms concerned starting 1 June 2022. In 2021, pig farming licences were approved for 142 pig farms. However, for 2022, pig farming licences were approved only for 62 pig farms, out of last year 142 leaves 62. This licensing decision is the consideration of the licensing committee, which made an assessment based on the results of inspections carried out according to the criteria contained in the Enakmen Penternakan Babi 2016 and the Penang Pig Farming Licensing Regulations 2021, particularly in relation to upgrading the system to a closed pig house system. For pig farms that fail to obtain a licence, the farmers have appealed to the State Government in line with the provisions of the Enakmen Penternakan Babi 2016. The MMK meeting on 23 February 2022 decided that any farm that is carrying out improvement works to comply with the farming licence conditions, and where the improvement works have reached 50% progress or more, conditional approval of the farming licence may be considered and the farm concerned is allowed to operate. For farms that still fail to comply with the farming licence and have not carried out any improvement works, compounds will be imposed on the farm until 31 May 2022. If the farm still fails to comply with the farming licence conditions, closure notices will be issued starting 1 June 2022. However, if a farm that has received a closure notice has made improvements and complied with the licence conditions, a licence may be considered for granting to the farmer. Based on the records of JPV Penang, there are 15 pig farms that have been upgraded 100% to closed farms, 31 pig farms have achieved more than 50% progress, 22 farms are in the process of being upgraded, with an estimate of between one and 49%, and the remaining 70 pig farms have still not been upgraded to the closed house system. Okay.
Okay. Thank you.
Thank you, Mr Speaker, and thank you for the reply just now by Penanti, and I see how the State Government is also focused on ensuring that the pig farm in Kampung Selamat is dealt with appropriately. And this pig farming issue is related to the issue of water pollution in Sungai Kereh and residents' objection complaints, because it involves water pollution and also smell in the surrounding area concerned. So, apart from ensuring that the farm follows the rules that we have set, efforts to ensure that the polluted water of Sungai Kereh is rehabilitated should also, and ought to, be given attention by the Honourable Member's side.
Kampung Selamat, the number of farms there is 65 farms with a pig population of 111,726, out of the total of 65, nine have passed, 22 passed conditionally and 32 failed, 32 in Kampung Selamat failed. The initiative taken to clean the drain and Sungai Kereh in front of Kampung Selamat is that we have issued a letter to the Director of the Department of Environment (DOE) through the Veterinary Department to bury the long-accumulated pig dung in the ponds on land that has been agreed with the Land Office. There is TOL land of nearly two (2) acres there at the pig farm, Kampung Selamat itself. So we do not need to bury it far away, meaning bury it there. And we have also received an allocation of RM800,000.00 from the Federal Government to clean the drain in front there. I think the main drain there, which will begin work this year, is by NAHRIM, National Water, this is a Federal Government agency.
Thank you. Okay? Okay, I invite the Leader of the Opposition, for the question.
My question is question 43. Thank you. No. 43. Present the position and development of closed-system pig farms to date. (a) In the Structure Plan and Local Plan, pig farms will be placed in two (2) areas and have received objections. What is the latest development? (b) How many closed farms have and have not been upgraded, and when is the enforcement date for the implementation of this closed farm system?
Is it still the same question?
Oh! This one is okay, the question is okay. Based on the Penang State Structure Plan 2030, the location of the largest pig areas in Penang State is at Kampung Selamat, North Seberang Perai and at Ladang Valdor, South Seberang Perai. The location of these two areas is within priority development areas. One, planning for the relocation of these pigs. Second, a new location has been managed by the Seberang Perai City Council (MBSP). Based on the latest records of MBSP, matters relating to objections to the placement of pig farms that were stated in the Draft Seberang Perai Local Plan 2030, MBSP is now at the stage of the Local Inquiry and Hearing Committee meeting for the SPU district. The objection and hearing session began on 10 May 2022 and is scheduled to end on 1 June 2022. The enforcement date for the implementation of the closed pen system... (interruption).
This one has already been answered.
This one has already been answered. Yes, that's right.
Soalan?
Supplementary question. Thank you, Mr Speaker. The people of Tasek Gelugor are still suffering from pollution. Rice plants have become too lush and no longer produce rice grains. They become sterile, "gabuk", as people call it, the village term "gabuk", and many fish die from pollution and odour. Rivers that cannot be used by the people, by the community in this area, originate from other places flowing into Tasek Gelugor and have been going on for a long time. So I just want to ask about the Kampung Selamat issue mentioned earlier: there are 111,726 pigs raised there under 65 pens. Those that passed for the closed system, nine (9), have done so, but 22 passed conditionally are still not implementing the closed system, and 32 failed. According to the licensing conditions, I think it will be done every year for the pig farming licence, and it must be included in the closed pen system, Honourable Member, yes. So I want, if possible, I want certainty from the Honourable Member's side? First, about the cost of the closed farm, who bears it, the farmer bears it or does he need assistance, for fear that he needs help, that we ourselves cannot provide assistance to build a closed farm with its irrigation systems, its drainage systems, its storage systems and so on, who bears the cost? Second, the compound imposed? How much compound, is it just a thousand or so, or are we imposing the maximum compound, or perhaps when we give a warning, the arrest is low, then we give the maximum, and in the law there is a maximum compound. If possible, we should impose the maximum compound so that he will continue to implement the closed farm. And in terms of implementing this Act or this enactment, if possible, the date should not be postponed, if we say 1 June 2022, we enforce it immediately, there are those who can build a closed farm, it's not that they cannot... (interruption).
Honourable Member, that is clear, the question is already clear.
If possible, I would like this explanation so that the people of Tasek Gelugor, the Tasek Gelugor area, Pokok Machang, Air Melintas and so on, all the way to the end of Sungai Kereh, do not experience this problem anymore from now on, InshaAllah... (interruption)...
Regarding the first question, which entered the paddy field, at the meeting we held at JPS at that time together with NAHRIM and the Environment Departments and all, at that time we sent drones to the pig farms to see where the effluent from the pig farm was flowing, so at that time we found that it could indeed enter the paddy field, and because of that, JPS has made, well, has made wells so that the sewage is diverted and does not enter the paddy field. That is what has been done. What NAHRIM now wants to do this year is to clean it up directly, so that is why we want to bury the pig dung, and we have also advised the pig farms to buy solid separators, meaning the solid separator does not separate pig waste and water, so the water can be treated and put into the pond, and the solid pig waste is separated for disposal, or they put it on their oil palm plantation, or it is turned into black soldier fly for pig feed. Those are several methods used. Enforcement, if we follow the enactment, should have been on 1 haribulan 1 2022, but at the EXCO meeting in February 2020, because there are too many pig farms that do not comply, and according to it they must be closed and demolished, a decision was taken to discuss with the pig farms with the largest numbers, these 70, 75, 76 pig farms, whether they will continue or not? The cost of building the closed farm is borne by the farmer himself, and what I was told is that Agrobank does not provide loans to build closed farms for pig farms. So they really need to have them. When in the Licensing Committee we found that some of the farms are hereditary, all of their children do not want to continue, so they do not want to bear the cost, some go to chicken farming, some go to plantations. So for those who say 31 in Kampung Selamat, their date is indeed 1 June, so they must prove that they are making progress, otherwise they really must, we will definitely not postpone it again, only now we are following the enactment, the enactment says 1 haribulan 1 2022, all we are doing is discussing with the farmers the reasons why the farms are too many whose operations must be closed... (interruption).
Thank you. I now invite the Honourable Member for Air Putih. Please, Honourable Member for Air Putih.
Thank you, Mr Speaker of the State Legislative Assembly. Question 44. No. 44. State the proposal to expand Digital Libraries in all districts in Penang and the position of the three (3) Digital Libraries up to now, including development and management costs? (a) Will the 24-hour, round-the-clock service be continued? If not, why?
Thank you, Honourable Member for Air Putih. The State Government developed the first Penang Digital Library (PDL) at Jalan Masjid Negeri, North East District (DTL) in October 2016. In January 2019, PDL Phase 2 was developed near the existing PDL, given that there was a vacant existing building and at the request of the public to accommodate more users.
In addition, the State Government also developed a PDL in the South West District known as Batu Maung Digital Library, located in the South Bay Plaza building, Batu Maung, and has been operating since 9 November 2019. Meanwhile, for the Seberang Perai area, the Butterworth Digital Library (BDL) was developed in the North Seberang Perai (SPU) District to enable residents in the Seberang Perai area to have the opportunity to use digital library services. The PDL was launched on 17 October 2020. However, at present, the State Government has no proposals to develop additional digital libraries, given that the concept of a digital library is the use or access of electronic reading materials through a system from any location or building. For example, Makerspace located in Balik Pulau has a space designated as a digital library. The State Government is ready to cooperate with private parties who are interested in establishing digital libraries and provide technical views and advice for the establishment of such PDLs.
The development cost and operating cost for each PDL from 2017 to 2021 will be placed on the table of the Honourable Member. The State Government will review the need for 24-hour/7-day operation if there are applications from many users. At the same time, the State Government will consider applications for 24/7 operation by taking into account various factors such as number of staff, operating costs, night-time security issues, building maintenance, the environmental conditions of the building and others directly involved in the operation of the PDL. In addition, there are activities that are difficult for the security guards to control due to 24-hour operation, and the school has also made complaints regarding this matter. Among the unhealthy activities reported are users using parking areas as dating places by spending time privately together in cars at night, students/users smoking and drinking liquor in the PDL area. The management of Penang Free School also reported that the school's boarding students leave the school premises at night, and there have been intrusion issues in the school grounds due to the 24-hour operating hours. There have also been issues where vagrants enter the PDL building to sleep and bathe at night.
In addition, the number of users after 11.00 pm is in the range of five (5) to 10 users at any one time, and this causes wastage of electricity supply and also payment of overtime allowances to PDL staff. The State Government also focuses on the Penang 2030 Vision to create a family-focused State, and 24-hour PDL operation is not in line with the aspirations of that vision. This matter has also been reported by parents that their children spend time at the PDL after 12.00 midnight. All PDLs developed in Penang are still operating according to the approved operating hours and standards and will be reviewed if there is a need for operation for 12 hours a day. So, in answering this question, the request that if PDLs are not allowed 24 hours, I think the time should be increased, that is my view at present, thank you.
Thank you, Dato' Speaker. I would like to ask the government to review the decision made, because when the PDL was launched in 2016 it received a warm response from the people of Penang, to the extent that it drew attention at the international level. As I was informed, the Princess of Thailand herself came to visit this PDL and also requested that advice be given so that an idea for a PDL, or a similar digital library, could be built in Bangkok. So naturally I was rather surprised when I heard the reasons and also the complaints about unhealthy activities that have occurred, which have become the justification for why it does not operate 24 hours a day, 365 days a year, because all these complaints did not exist before, or before the COVID pandemic. So, in that regard, the issues raised must indeed be given serious attention, but I am confident they can be overcome by adding security and also providing lights to illuminate the area, or so that the area there can become brighter…(interruption).
Itu soalan..(gangguan).
Yes, that is my question, Dato' Speaker of the State Legislative Assembly. So I think it should not look for excuses not to allow the PDL to operate for 24 hours, and not only as is practised in Penang but also in Butterworth. So I hope this matter can be reviewed so that it is in line with Negeri Pintar and becomes another attraction for Penang. That is all, thank you.
Thank you, Honourable Air Putih. I agree with the Honourable Air Putih that the behaviour of the students who use it is a reason, but the blow to the PDL has also been the two (2) years of COVID, which I feel we cannot avoid. Besides that, I feel the Penang State Government encourages the PDL, and the Penang Digital Library does not mean that these libraries that are available also have digital components. So I feel this matter needs to be looked at again, and the issues of staff, the issues of control and so on, I feel are something that are common, so if we continue to expand these funds in Penang then I am touched by the view of this Honourable Air Putih…(interruption). I have no issue…(interruption)..
Supplementary question. Thank you, Dato' Speaker of the State Legislative Assembly, because the first library in the Seberang Perai area is in my constituency. I thank the Penang State Government, but as has already been discussed, we see there are bureaucratic decisions that can slow down, delay and weaken the Digital Library, such as, apart from the 24 hours at present, although the Butterworth Digital Library has never opened 24 hours, previously it was said it would open 7 days a week, but now it is closed every Sunday and Monday, or according to the practice of our libraries. So I request that the Digital Library, which is very important, where students in the Butterworth area and also from Permatang Pauh from UiTM and the polytechnic come there because they do not need to pay for Internet and they do not need to buy coffee like at McDonald's and KFC, so I request that if possible Butterworth also be opened 7 days a week, if not 24 hours, at least until 11.00 pm. This is a request from me as the State Assemblyman for the constituency, Dato' Speaker.
Thank you, I think I also do not need to answer that question. I indeed have Perai, and there is also no Digital Library, so I also think, why is there one in Butterworth but not in Perai, because Perai is half industry and so on. So perhaps in the future we will look at this matter, then we will prepare funds, and I will ask the Office of the State Secretary (Pejabat SUK) to review how we can further improve the hours, if not 24 hours perhaps we can close at 10.00 pm or 12.00 midnight, but the issue of control, the issue of all this must be addressed, this too is not there, there is no other way, this is normal, la, anywhere…(audio interference).
Thank you, please, Bayan Lepas.
Thank you, Dato' Speaker. My question is No. 45. No. 45. Penang South Reclamation (PSR) Project. (a) What is the total area of land in that area that will be handed over to the Penang State Islamic Religious Council for the construction of mosques and Islamic cemeteries and other purposes to safeguard the interests of the Muslim community? (b) Does the State Government obtain any surplus returns apart from financing the PTMP?
Bayan Lepas question regarding PSR: the total area of land for the purposes of mosques and cemeteries that has been planned to be handed over to the Penang Islamic Religious Council for the development of Penang South Reclamation (PSR) is estimated at 8.05 acres according to the latest Amended Master Plan, which will be presented for consideration by the State Planning Committee later. For the second question, the question concerning "Does the State Government obtain any surplus returns apart from financing the PTMP apart from financing for the implementation of the Penang Transport Master Plan (PTMP)?" The PSR project will bring many benefits to Penang, where the State Government is the project owner. These benefits include economic development expected in terms of the generation of Gross Domestic Product (GDP) amounting to RM2.2 trillion and Foreign Direct Investment (FDI) exceeding RM70 billion, as well as job opportunities totalling 460,000 by 2050. Two, new land for development, a high-technology industrial park, mixed development, commercial, affordable housing, public transport infrastructure, a depot for the LRT in Bayan Lepas and others, which will help overcome the problem of a shortage of safe land for future development. And three, new internationally and locally recognised tourism attractions and green recreation to develop Penang's tourism and eco-tourism sector, which will create job and business opportunities for the local people. Number 4, socio-economic development for the local people, especially fishermen in the South Penang Island area, who receive benefits from the Social Impact Management Plan (SIMP), such as financial aid (ex-gratia) for new boats and engines, job and business opportunities, opportunities to join training and skills schemes and tuition for children who are still in school, housing schemes and membership in cooperatives, so that the South Penang Island community can generate additional income for them. And number 5, development of new green areas, especially mangrove forests around Pulau PSR and other places in Penang under the implementation of the PSR Ecological Development Programme (PEOM), which also includes initiatives such as artificial reefs (tukun tiruan) and unjam, release of fish and prawn seeds, construction of eco-friendly shorelines, which encourage biodiversity, provision of allocations for marine ecology research full of reefs (tukun) and so on, which also benefit fishermen and the fisheries sector. Through these benefits the State Government will be able to continue efforts to ensure Penang can continue to progress and maintain its position as a preferred destination for international investment and tourism. Sustainable economic growth is the return hoped for by the State Government so that it can continue to guarantee the well-being of the people of Penang.
So from that explanation, Dato' Deputy Chief Minister, it means that out of the 4,500 acres of reclaimed land, only 8.05 acres will be handed over to the Islamic Religious Council. So does this 8.05 acres cover all three islands, or are the 8 acres located on Island B only? Because we already understand that Island A is for industrial areas or there is still no planning at all, because what I raise here is to address the concerns of the people outside, this island is not for us, this island is for outsiders, people
Malay will ni..ni..ni.. so, as far as possible, if there is already a Master Plan or a careful plan, it must cover all aspects. If, for example, Island A has 2 acres of land, Island B has 3 acres of land for Muslims for the Islamic Religious Council, which I think it would be better for us to hold explanations at the grassroots level, thank you.
For the draft Master Plan prepared now, only that 8.05 acres has been prepared so far. Perhaps we will see when the detailed plan and detailed layout are prepared in future, and there may be further land requirements to be handed over to the Islamic Religious Council. So far only a new draft has been prepared.
Thank you. I would like to invite the question of the Honourable Sungai Acheh. Sungai Acheh is not in the House, so the question is skipped. The next question, Honourable Sungai Pinang, please.
Thank you, Dato' Speaker. My question is No. 47. No. 47. Postpartum confinement centres (Confinement Centre). (a) List the licensed and unlicensed Postpartum Confinement Centres as of April 2022 in the State of Penang. (b) State the status of each application and state the problem if any were unsuccessful. (c) State the State Government's initiatives in ensuring these centres can operate under licence.
Thank you, Honourable Sungai Pinang and also Honourable Member. Mr Speaker, until now, Postpartum Confinement Centres, also called confinement centres, have not been subject to any Act, and there is no agency made responsible for licensing Postpartum Confinement Centres. So for question (A), list the licensed postpartum confinement centres. For your information, only MBPP issues licences for premises and advertisements for such activities, so in MBSP there are 12 Postpartum Confinement Centres that have been licensed. And one more has not been licensed because they did not apply, yes. However, MBSP has also taken action against these Postpartum Confinement Centres, issuing compounds and notices to operators. For MBPP there is absolutely no data at all, because until now they have not issued licences for anything, so because of this, the State Executive Council (MMK) of mine has taken the initiative to set up a Committee chaired by Honourable Sungai Pinang. After 12 meetings, this Committee has produced a guideline for registering Postpartum Confinement Centres, so I want to say thank you very much to Honourable Sungai Pinang and also the members of this Committee.
The Guidelines give authority to the local authorities (PBT) to issue operating licences and help monitor these business premises. The monitoring also covers aspects of planning and design to ensure that existing centres that are operating and new ones can comply with technical and safety aspects, and subsequently obtain business licences from the PBT. So these guidelines will take effect on 1 July this year. MBSP also takes the initiative to allow Postpartum Confinement Centre activities to operate in business premises or business buildings without requiring an application for a Planning Permission, to facilitate operators in obtaining business licences, thank you.
Terima kasih.
Thank you, supplementary question.
Sungai Pinang, the chairman of the Committee, do you want to ask again?
But my question has not yet been approved, there is no decision yet. Thank you, I have only just learnt that it will take effect on 1 July, and my question is, what are the further initiatives or actions of the State Government to encourage the operators of these Postpartum Confinement Centres to register?
Thank you, Sungai Pinang. We will announce this decision to everyone, and if there are, and to encourage them to come forward to make applications, and I hope all Honourable Members can cooperate with us. If there are confinement centres in their areas, they can apply to the operators to apply for licences. After 1st July, thank you.
Thank you, please.
Supplementary question. Thank you, Honourable Member. Dato' Speaker, thank you, Honourable Padang Lalang, for the answer to question 47 raised by Sungai Pinang. My question is whether the State Executive Council (MMK) of Honourable Padang Lalang has any plans or budget allocation for next year so that these Postpartum Confinement Centres can be given assistance to increase their openings in certain areas, apart from what we see, these confinement centre operations are mostly from the Chinese community. So I am confident there are also some, what, operators, or a small portion of them from the Malay community who also carry out the same activity, except they have not registered these centres formally, and perhaps traditional treatments that can be developed by the Chinese, Malay and Indian communities can also be diversified and centralised in several places for care, and can be commercialised as an effort to provide good exposure to mothers after childbirth, thank you.
Thank you. So far we have only focused on issuing licences, and at present, many of these operations or centres do charge quite high fees. RM5,000.00; RM7,000.00; RM8,000.00. So we consider it a business that can, I think it can operate without assistance. But if there are confinement centres that are more community-based and need assistance, perhaps we will give consideration. So I hope they will come forward to discuss with me. Okay, thank you.
Dato' Speaker, I want to add a little, may I?
Soalan.
Question, yes. I agree with the proposal from my colleague from Permatang Berangan, Honourable Padang Lalang. We see that confinement centres, although expensive, are a necessity, and if there is competition, prices will drop automatically. So we ask, if possible, the State Government through the Penang Development Corporation (PDC) or other means, also provide funds for confinement ladies who operate on a small scale, who come to houses, massage, look after and so on. If they can expand their business, more confinement centres, prices will be lower. Can the State Government provide special funds for this purpose? This is my question, Dato' Speaker.
Thank you. I think requests like this usually exist. But we need to consider the government's financial ability, then we can say whether it is possible or not. But we will continue to strive to look at and study this need, and if it is possible we will do it. Thank you.
Thank you. Thank you to all Honourable Members who have asked and to the EXCO who have answered. So the 1 hour 30 minutes for the Oral Questions session has now ended in accordance with the Rules of the House Proceedings. And I invite the Right Honourable.
Y.A.B. Chief Minister: Honourable Dato' Speaker, answers to the Oral Questions that have been answered will be placed on the table of the Members who asked them and will be included in the Official Record.
Thank you.
Y.A.B. Chief Minister: And also Dato' Speaker, in accordance with Rule 6A (i) of the Rules of the State Legislative Assembly House Proceedings, I request that the sitting time today be extended until 6.30 pm.
Sokongan?
I beg to second.
Thank you. Honourable Members, the Right Honourable Chief Minister has moved a motion under Rule 6A(i) to extend the sitting time today, Thursday, 2 June, until 6.30 pm. Honourable Members who agree, say "Yes".
Members of the House: "Yes".
Honourable Members who do not agree, say "No". The motion is agreed by all. So, Honourable Members, we are now in the winding-up session for the motion of thanks to His Excellency Tun, Yang di-Pertua Negeri Pulau Pinang, for having graciously delivered an address to this House on the day of the official opening, and I invite Honourable Members to take part in the winding-up session.
Before we begin, yesterday I surveyed all the EXCO Members who took part in the winding-up session, and I want to express my thanks especially to the Honourable Tanjong Bunga, the only winding-up that was good, excellent, transparent and should be made an example for other Honourable Members. Please.
Assalamualaikum, salam sejahtera. Honourable Dato' Yang di-Pertua, Honourable Members, Y.A.B. Chief Minister, fellow EXCO members, Honourable Members, heads of department. I would like to record my thanks to all the Honourable Members who took part in the debate on the motion of thanks to His Excellency the Yang di-Pertua Negeri of Pulau Pinang, and who also debated issues relating to the portfolios under my supervision. Thank you for giving me the opportunity to answer the additional questions raised during the debate session.
Honourable Dato' Yang di-Pertua, for the industrial sector, as has already been mentioned and stated by the Chief Minister, we are proud that Penang has recorded excellent investment performance. Penang recorded manufacturing investment of RM76.2 billion in 2021, before that RM14.1 billion in 2020, and RM16.5 billion in the previous year, which is 2019. And for 2022, according to the report issued by MATRADE (Malaysia External Trade Development Corporation) up to March 2022 for electrical and electronic goods, Penang produced export value approaching RM26.2 billion, which is 58.5% at the state level. The year 2022 is a very special year for Penang's industrial sector because it marks the 50th anniversary of Penang's Industrial Transformation, and the State Government, together with InvestPenang and Penang Development Corporation (PDC) as the lead agencies, launched the slogan “50 Years of Excellent and Beyond”…(with permission), in January 2022. The State Government has established a public-private partnership with industry leaders to outline and coordinate programmes throughout the year to celebrate the “50th Anniversary of Penang's Industrialization”, with the objective of showing the success of Penang's transformation and future opportunities. There are 13 themes in total for this year's celebration, namely Penang's 50 Years of Manufacturing Excellence, Global Innovation Hub, Talent Development, My Penang My Workplace, R&D, E&E, Medical Technology, Digital Economy & Global Business Services, Food Technology, Space Technology, Local Technopreneurship, Startup and Environmental, Social & Governance (ESG). Next, the challenge for Penang is 'What is the next thing for Penang?'' after we have achieved the success story of 50 years. The challenge for us, for the sector, especially for E&E, is that it is time for our SMEs, small and medium enterprises, to move up a level of manufacturing, namely from Contract Manufacturing (OEM), in which we have had strength since long ago, to ODM (Original Design Manufacturer) and Original Brand Manufacturer (OBM). From OEM to ODM and then to OBM. Our strength is that we have a large 'talent pool'. We have thousands of IC Design Engineers in Penang, and the management going forward, as mentioned earlier, the growth into R&D and high value investment will certainly be able to sharpen this same talent, local people working in multinationals can train new talent for the sustainable future of the industrial sector in Penang. At present, Penang, Malaysia, Thailand and also Vietnam are the three (3) in this ASEAN region, the three (3) main producers of the E&E sector and chip components in ASEAN.
Taiwan has said that Penang, Malaysia can become a producer, a lead producer of the component that we know as chips, which are now in shortage throughout the world. Furthermore, apart from focusing on the manufacturing sector, the State Government will also continue to drive the growth and investment of the digital economy in Penang. The State Government's commitment to strengthening the potential of technology for the purpose of the state's transformation began in 2005, when Penang became the first state to be given MSC status, or Multimedia Super Corridor, to develop an information and communication technology (ICT) hub in Penang while further increasing the added value of knowledge-economy-based industries. From then on, the State Government has implemented various measures to drive digital technology transformation in Penang through Digital Penang, in order to encourage investment in digital economy-based activities with high added value, such as Global Business Services, Research & Development (R&D), Design & Development, Industry 4.0, artificial intelligence technology or AI, data analytics, Internet of Things, Integrated Circuit Design, e-commerce and so on. Penang will continue to encourage new and existing companies to continue carrying out high-tech, high added-value activities, and until now the State Government has succeeded in attracting investment from well-known international companies such as AMD Global Services, Clarivate, Citigroup, Jabil, Teleperformance, Synapse, Starfive, UST Global, and we are estimated to have created more than 14,000 high-value jobs in the State of Penang so far. The potential of the MSC in the State of Penang has also succeeded in attracting international high-tech companies to continue investing in this state, by providing comprehensive utilities and infrastructure as well as infostructure for these international companies to operate according to the required standards. Therefore, the State Government through PDC has built GBS@Mahsuri, which has an office space of 80,000 square feet to meet the demand of companies involved in the digital economy industry. The entire space of GBS@Mahsuri has been successfully leased to the leading global GBS companies mentioned earlier.
Next, entrepreneurs in the digital economy. The State Government, answering the question of the Honourable Permatang Berangan and the Honourable Batu Uban, asked that more training be provided to entrepreneurs in Penang to face the era of the digital economy, which is based on online buying and selling business, online transactions…(with permission). The State Government has taken action to ensure that local entrepreneurs are competitive and constantly improve the operational efficiency of their businesses. Entrepreneur guidance programmes and activities have been implemented through physical methods and also through online platforms to achieve high participation. From 2019 to 2021, the MMK for Entrepreneur Development trained a total of 1,617 entrepreneurs, including online marketing courses, while Digital Penang, which was established in 2020, has implemented several programmes to guide entrepreneurs towards digitalisation as follows: (i) Penang SME Go Digital Programme; (ii) DahDigital Programme; (iii) Go E-Commerce Digital Penang Programme; (iv) Website Know-How Programme.
So, a total of, for these programmes, we have trained more than 6,389 entrepreneurs for the programmes above. Penang Halal International carried out the Smart Partnership Programme with the digital e-commerce marketplace platform provider Shopee with an allocation totalling RM500,000.00 in 2020. This is an effort to help entrepreneurs affected by COVID-19 and succeeded in registering 15,000 entrepreneurs for the period April to 31 December 2020 during COVID. We had a partnership with Shopee which enabled a Shopee Penang E-Mall micro-site to be created to facilitate entrepreneurs affected by COVID-19 in marketing their goods online. The allocation in the form of discount vouchers given to customers to shop on this digital platform then helps entrepreneurs increase sales of their products through the digital platform. For 2021, RM1 million was allocated for digital platforms involving Shopee, Pgmall and Food Panda. The Penang E-Mall Shopee Microsite recorded 42,000 registered online merchants as at 31 December. Next, PDC has organised various entrepreneurship courses to add knowledge and understanding related to business. In addition, PDC also organised various entrepreneurial awareness and motivation programmes to strengthen their respective businesses. For 2022, PDC has arranged the following entrepreneurship programmes: 'Business Transformation Course Towards Digitalisation', 'Business Motivation Strengthening Course' scheduled for 19 June 2022, 'Programme to Empower Women Entrepreneurs' scheduled for August 2022, 'Coaching For Great Leaders Workshop' scheduled for October 2022, and 'Tip Top Financial Management Workshop' scheduled for December 2022. The PEKA PKS loan scheme, Honourable Dato' Yang di-Pertua, the 'PEKA PKS Loan Scheme' for Small and Medium Enterprises was introduced by the State Government itself…(interruption).
Want to ask for a brief clarification. Thank you, Honourable Batu Maung. Just now you especially raised how vibrant the entrepreneurs venturing into e-commerce sales are, particularly with the platform provided together with our partner Shopee, where there is a special e-mall. But following this e-commerce activity, which we can see is very vibrant, there is an issue where, in addition, shop houses and residential houses are now being used as storage or depots for goods marketed through this e-commerce. Perhaps, I would like to suggest, Honourable Batu Maung, should we hold discussions also with the relevant parties so that we can look at the use of shop houses or residential houses as depots or storage places, which often cause traffic congestion when our delivery partners come and collect the stock, which I think I am worried about, may become a big issue. Thank you.
Thank you, Pengkalan Kota, for noting the suggestion. In fact, we have also discussed with PDC how units that are not leased at the moment can be used as storage for these digital merchants, who, when their sales increase, face constraints on where to store their goods. We will take it, we will hold further discussions and respond to the suggestion raised by Pengkalan Kota. Thank you.
To help entrepreneurs affected by COVID, the PEKA 1.0 Scheme with RM30 million was implemented in April 2020 with a six (6) month moratorium and 24 months repayment without interest, with 1,651 recipients and a total loan amount, loans between RM5,000.00 and RM50,000.00. The PEKA Tourism Scheme, meanwhile, has a fund of RM10 million to help the tourism sector affected by COVID-19. The PEKA Tourism Scheme was named the PEKA 2.0 Scheme. Next, from May to August we found that PKP 3.0 (Movement Control Order 3.0) occurred, which once again affected micro entrepreneurs and small and medium entrepreneurs. Because PKP 3.0, which began in May 2021, once again, the PEKA 3.0 Scheme was permitted in August 2021 with a total of RM5 million but was specifically aimed at small entrepreneurs, with loan amounts of RM5,000.00 to RM20,000.00 and a total of 400 recipients. This is to answer the question from Seberang Jaya, because both of these attractive savings schemes and loan schemes have caused the existing SPH loan scheme to receive less response for the period 2020 and 2021. Efforts will be intensified after this, in 2022, to increase public awareness of the existence of the SPH Scheme, and we will also review the SPH Package to see how to continue helping entrepreneurs going forward.
Mr Speaker, is it finished?
Not yet.
Honourable Member. Mr Speaker, not yet? Not ready?
For local businesses, the State Government is attentive to entrepreneurs who need business premises to market their products. The proposal by the Honourable Permatang Berangan that a local business centre be established has been raised. I would like to inform you that the State Government has an initial plan to establish such a centre. So far, PDC has a plan to develop a Penang Entrepreneurs' Plaza Complex in the IKS Industrial Area, specifically for micro, small and medium entrepreneurs covering various sectors within the PDC Building area in Batu Kawan. We also look at examples such as Pekan Rabu and Jonkers Walk in Melaka, which may be considered for this purpose.
Mohon mencelah.
Sila.
Thank you, Honourable Dato' Yang di-Pertua. Thank you to the Honourable Batu Maung for the clarification for the winding-up. Regarding the application in my debate for a 'Local One-Stop Centre' for small traders and entrepreneurs, it may be suggested to the State Government that they look at areas by district, because in my written question there is still no one-stop centre in the Seberang Perai Utara area. So perhaps on the part of the MMK, the Honourable Batu Maung could consider the proposal to hold Entrepreneurs' Plaza Complexes by district in all 5 districts in Penang. So I strongly support the proposal for the construction of a plaza complex mentioned in Batu Kawan; perhaps after this the State Government can consider other districts, including SPU. Thank you.
Thank you, Permatang Berangan. We pay attention and take note, and this is also subject to the budget and the State Government's capacity for that effort. Thank you. Next, regarding trade, in answering the issue raised by the Honourable Sungai Dua, the State Government and the Federal Government need to cooperate to address the issue of rising prices of goods. As has been said at length, we already have a special urgent motion to discuss this issue. Just to mention here, regarding cooperation, in fact since 2018, we have had engagement with Ministries, the Minister himself. The Ministry of Domestic Trade and Consumer Affairs (KPDNHEP) has only convened two (2) meetings, the Ministry of Entrepreneur Development only once, and the Ministry of International Trade and Industry (MITI) has never convened at all. So how are we to cooperate? But thankfully, at the level of Central Agencies, we continue to hold discussions jointly at the level of the Federal and State Governments in steering the state's economy. Cost of living, as I mentioned earlier, Sungai Dua, we have discussed it; it is indeed very broad and we do not want to raise it again. First, I ask, I also mentioned yesterday that the need for subsidies, perhaps Sungai Dua can raise with the Prime Minister that these subsidies are needed and should be increased and expedited, because this affects, Penang's success story for chicken production is a success story that exceeds sufficiency, but the issue is food, because of dependence on wheat, maize, soya grains…(interruption).
Want to ask for a brief clarification. Just a little. The Honourable Batu Maung, I am indeed interested, we have been waiting for this. The Honourable Batu Maung mentioned these subsidies, where clearly from yesterday's news we were informed that all these subsidies will be abolished and converted into a direct assistance plan for the B40 group, as announced by the Federal Government. But what is even more shocking is that the motion brought by the Honourable Machang Bubuk urges the Federal Government to look at how we can address the cost of living or the rising prices of goods, and then suddenly we are struck with the proposal
that there is an intention from the Federal Government to reintroduce the GST tax, which is crushing the people. So I would like to ask for the Honourable Batu Maung's views on this issue.
Thank you. We are all concerned about our need to achieve the level of self-sufficiency. I mention the Department of Statistics Malaysia (DOSM), Jabatan Perangkaan, which has stated that a country's self-sufficiency at present, in terms of rice production, is 40%, so we still import rice, but the AP for rice has not been abolished. We still import 70% of our chilli. We still import 80% of our meat, and meat, today, which, that is why for the moderate measure the need for subsidy is very crucial. Let us look at our neighbouring country: its stockpile, its food safety, is six (6) years, six (6) years. A political figure from the new UMNO, perhaps Sungai Dua knows this, has said that in Malaysia our food safety stockpile is only two (2) months, two (2) months. That is why we do not want our B40, and I raised this at a meeting with the Minister of Domestic Trade and Consumer Affairs (KPDNHEP) on 24 May recently, that this issue is serious. This issue needs immediate attention and must not, the subsidy must not, it must be expedited. The Minister of Finance himself said at the Davos Conference recently that there is a need to increase subsidies to RM71 billion, with oil subsidies alone at RM28 billion. That is why I hope, because of this, that is why I say congratulations for the motion brought by Pulau Pinang, by what, the State Legislative Assembly, that this issue needs to be given attention by the Federal Government. Next, Domestic Trade and Consumer Affairs and Entrepreneur and Industry Development. Since early 2020, missions and exhibitions of goods, domestic and overseas, could not be held because of COVID-19, the Movement Control Order and cross-border restrictions, although the calendar had been scheduled. Since cross-border relaxation was implemented by several countries such as the United Arab Emirates (UAE), the State Executive Council (MMK) for Trade, Industry and Entrepreneur Development participated in Expo Dubai, in which this government also took part from 16 January 2022 to 23 January under Penang Week. The Pulau Pinang State Government delegation consisted of myself, who was accompanied by YB. Yeoh Soon Hin, EXCO for Tourism and Creative Economy, and was officiated by His Excellency Tun Dato' Seri Utama, Yang di-Pertua Negeri Pulau Pinang. For the information of Batu Lancang, the State Government participated in Expo Dubai 2020 through the Penang Week programme, and PDC is the lead agency for this delegation, and the Malaysian Green Technology and Climate Change Corporation (MGTC) is the secretariat for this expo for the Ministry of Science, Technology and Innovation (MOSTI). The objectives of Pulau Pinang's participation in Expo Dubai are as follows: to promote Pulau Pinang as a main destination of choice for investors in the high-quality and high-value technology manufacturing sector, especially E&E, in line with Pulau Pinang's title as the Silicon Valley of the East. Next, to promote Pulau Pinang as a tourism destination, a main choice in the Asian region including Medical Tourism, to introduce Pulau Pinang as a gateway to the halal industry and agrotech products, to open opportunities and provide exposure to Pulau Pinang companies to explore global markets, especially the Middle East and North Africa (Middle East and North Africa) which has 577 million population.
At Dubai Expo the State Government also showcased projects of PDC: Industrial Park BKIP2, BKIP3 in Bandar Cassia; Medical Hub, Smart Medical Hub in Bandar Cassia; Linear Waterfront Development or the proposed reclamation area; Mixed Development Bandar Cassia Tourism and Mixed Development; Global Business Services Cybercentre in Bandar Bayan Baru and Bayan Lepas….(interruption).
Okay, yes, whose mobile phone is ringing? Please switch it off, whose is it? Please help. Honourable Member, I will ask you to leave later.
Maafkan Dato’.
Okey, sambung.
Overall, the results of the State Government's participation in Expo Dubai 2020 are as follows: five (5) Memoranda of Understanding (MOU) and two (2) Memoranda of Agreement (MOA) were signed, valued at USD4,355,228,272 or RM18,150,000,000.00; 110 "Business Leads" were obtained, involving various programmes held throughout Penang Week such as Business Matching and the meetings attended, amounting to USD16,295,034.7 and RM68,458,747.60; the total "Potential Values" obtained throughout Penang Week Expo 2020 Dubai amounted to USD4.371,523,306.70 and RM18,218,458,747.60. Participation in Expo 2020 is very meaningful because it brought together the participation of 192 countries, where there are opportunities for networking and strengthening trade cooperation between Pulau Pinang, Malaysia and new markets. At present, follow-up discussions and communication between the government and private agencies involved are ongoing. Among the potential and opportunities for trade and investment are green technology, cross-border e-commerce, warehousing and logistics, waste to energy, and halal initiatives and digital technology. Next, for the future development of entrepreneurs. Honourable Dato' Yang di-Pertua, at the recent MMK meeting for Entrepreneur Development, we agreed to introduce the Entrepreneurship Campaign One Culture, Penang Entrepreneur, for the purpose of cultivating the spirit of entrepreneurship among the people of Pulau Pinang through various attractive programmes with the following five objectives: first, to cultivate entrepreneurship; second, to create employment; third, to build creative and innovative capacity; fourth, to encourage entrepreneurship as a career; and fifth, to upgrade the economy to increase household income, as outlined in the Penang Vision 2030 Agenda. Details of the programme are still under consideration by the MMK Committee for Entrepreneur Development and will be announced shortly, and the launch of the One Culture Entrepreneurship campaign is scheduled to begin at the end of June 2020. Among the programmes proposed for this campaign are seminars and courses on entrepreneurship as a culture, Entrepreneur Tour, Penang Entrepreneur Week and Expo, and Entrepreneur Awards Day.
The Pulau Pinang State Government, under its agency Penang Halal International, will organise the Penang International Halal Expo & Conference on 1 to 3 July, themed Building Resilience and Sustainability Towards Stronger Growth. The PIHEC event will be held at the SPICE Convention Centre. The expo will showcase various halal products and services from various companies and industry players in Southeast Asia such as Malaysia, Indonesia, Vietnam, Thailand, the Philippines and Singapore. The Forum Conference will address topics on the state of the world economy after the post-endemic Covid-19, especially changes in global economic aspects, rising inflation rates, trade and logistics costs, the global food crisis, and the growth of the digital economy and green technology. So far, PIHEC has received participation from Indonesia, the Philippines, Spain, the United Kingdom, Singapore, South Africa, Dubai, Thailand and Kazakhstan. PIHEC has also received participation from the State Governments of Selangor, Negeri Sembilan, Sabah, state government agencies, and also the Federal Government. Next, the proposed Round Table World Islamic Economic Forum, which will be held on 27 September 2022, the Round Table Conference of the World Islamic Economic Forum to be held at the SPICE Setia Convention Centre, is entitled Economic Rebound: Transforming the Future. We also have major events that have been announced, such as SEMICON SOUTHEAST ASIA in June and also the World Congress on Information Technology, which will be held from 13 to 15 September. Next, after 50 years of rapid growth, especially in the industrial sector, Pulau Pinang has become a major investment destination in this ASEAN region, especially in electrical and electronics. Pulau Pinang also becomes a centre of attention for tourism, especially in medical tourism. With the reopening of cross-border travel and many other countries after Covid-19, the economic sector of Pulau Pinang is expected to experience rapid growth. Nevertheless, we need to prepare with the resilience agenda to face challenges and an uncertain future and future shocks, future shock (with permission). Covid-19 is one example of an unexpected calamity, which is why the State Government needs a resilience agenda to sustain sustainability and…(interruption).
Thank you, Dato' Yang di-Pertua. I just want to raise the issue of halal. I have spoken in this House many times about halal, about the provision of materials that can be used for the halal food industry, such as gelatin and so on. I have mentioned it many times, and I see this matter is still at the stage of us trying; perhaps there is something, but not much, because most gelatin and similar materials we import from abroad. This halal status may be rather doubtful. So if possible, I ask for the views of the Honourable Member, that this be focused a little more so that we make preparations for this, one. Second, regarding factories and industries, we know that Pulau Pinang's main economy, its contribution, comes from industry, including the tourism industry and so on. However, I am worried and perhaps want to seek certainty from Batu Maung. Is the issue we are facing now, the issue related to water, a water crisis, among the matters expected to occur and discussed on how to overcome the issue so that investors will remain, that water costs at factories will be low, not too high, if we carry out seawater processes and so on, it will be very costly. This
I think it may be possible to include in the discussion matters that will occur; if they do occur, they will cause industries and also foreign investment to leave Pulau Pinang. Thank you.
Thank you, Honourable Member for Sungai Dua. As for the production of gelatin, we are still trying, but it has not succeeded. Agencies such as JAKIM, the Department of Islamic Development Malaysia, at the central level and many other states are still at the research and trial stage to produce halal gelatin. We will follow up on the proposal, and if it succeeds, of course the State Government is also ready to accept and cooperate for that purpose. Next, the issue mentioned earlier about water, which was mentioned yesterday, when the US Trade War occurred and when the Ukraine-Russia War occurred, we found that all countries and states began to enhance food safety, water safety, not only that, defence safety, and here in Pulau Pinang we also need to prepare, as mentioned earlier, the State Government's plan on water supply, where will we get it? Previously the focus was on China as a producer of the world's raw materials, and then when Ukraine and Russia went to war again, this is the main producer of grain in the world, 35% of the world, not only grain but nickel, also oil and gas. All countries and states have begun to make this issue how we ensure a safety net for the state and country, food safety planning, so that when crises or shocks such as COVID-19 or war occur, states and the country have sufficient supplies. That is why it is a shared responsibility; the State Government and Federal Government must address this issue. Honourable Members, Dato' Yang di-Pertua, all Honourable Members, I thank you for the matters raised, and InsyaAllah, for other matters that may not be explained, we will meet again to focus on how we can continue to drive the beloved State of Pulau Pinang. That is all from me, and I hereby support.
Thank you, Honourable Batu Maung. I would like to invite Sungai Puyu, please, Sungai Puyu.
Thank you, Dato' Speaker. I seek to take part here on the issues raised in this honourable House. First, I want to express my gratitude and thanks for still being entrusted with the responsibility as Chairman of the State Executive Council (MMK) Committee for Environment and Welfare, and for delivering the winding-up speech on the issues arising from the environment, where, as everyone knows, all environmental issues are becoming increasingly challenging day by day, and efforts to tackle them demand cooperation and high commitment from all parties. Environmental problems such as air pollution, water pollution, disposal of solid and toxic waste, illegal logging, use of natural resources and so on, and cause imbalance to the environment.
Landslide tragedies, flash floods, air, water and land pollution, global warming and so on are the effects of ecosystem instability caused by climate change. These environmental issues are challenges that must be faced and addressed by all of us. Here, indeed, the Honourable Member from Sungai Dua said that nothing was seen being done. I want to tell you the State Government is not idle, it is very busy. What we have done now is that JAS, our Department of Environment, has issued 3,216 summonses since 2018 until May 2022 with compound amounts collected of RM6,432,000.00, 34 premises and 36 charges, as follows: for water 19, air 1, scheduled waste disposal 1, EIA 8, directive notices 3, open burning 1, licences 3. Details of the compounds are: diesel motor vehicles 448, noise 459, petrol 1, premises disposing of scheduled waste 1,744, industrial effluent 382, sewage 19, Section 28A Open Burning 163. Apart from that, JAS takes action through directives, directives issued to premises that do not comply with the prescribed regulations. JAS's policy is that through educational enforcement, after educational enforcement, anyone who does not comply will be subject to action, as the actions that have been taken. The Honourable Member from Sungai Dua also made a statement in this House that the Permanent Forest Reserve has been reduced. I apologise because that is not correct. If the Honourable Member from Sungai Dua wishes, indeed, he may discuss with me, but what is said in the House is my duty in the House to answer. In answer to the question raised by the Honourable Member for Sungai Dua, the State Government is indeed very committed to efforts to sustain the environment, especially in ensuring the sustainability of forest resources in this state. The State of Pulau Pinang has 6,568 hectares of forested land gazetted under law for protection purposes, of which 5,383 hectares are Permanent Forest Reserve gazetted under the National Forestry Act 1984, and 1,182 hectares are the Penang National Park gazetted under the National Parks Act 1980…(interruption).
Sungai Puyu, thank you, Sungai Puyu. Just now, Sungai Puyu stated that I made a statement that the Forest Reserve was reduced. I do not remember saying that, but I think I did not say that, because I have looked at the written report of the Forestry Department, which reports indeed an increase; I have looked at it, so would I say it was reduced? I think I did not reduce it. What I said is that there are forest areas, whether owned privately or by individuals, that have been cleared or logged, which we need to look at and take action on, and I congratulate JAS for taking many actions in terms of compounds and so on. However, I emphasise in my speech the matters relating to sustainable development, environmental protection, the sea and so on. That is what we need to give emphasis to. In the Green State manifesto, this must be fulfilled. Let us not continue things that damage the ecosystem and the environment, even though there is a guarantee to carry out mitigation, but sometimes mitigation does not return to its original state, it does not return to its original condition, and it will cause problems that will occur, it has shortcomings, which is what I mentioned. If the Pulau Pinang State Government wants to see green things that will sustain, then we must ensure that this happens and that it does not destroy.
Jelas.
Thank you, but does the Honourable Member remember that I invited you to become a member of the State Executive Council (MMK) Committee on Environment and Welfare, and that you rejected it? If we have such a pure heart to protect the State of Penang, we set aside political differences and work together. I am very sorry that my effort was rejected by the Honourable Member. Honourable Member, the State Government, through the State Executive Council (MMK) Committee on Environment of Penang, has already listed several efforts as KPIs for achieving the gazettement of Permanent Forest Reserves in ensuring environmental conservation in this state. On 26 March 2020, an area of 285.84 hectares of forest on Pulau Jerejak was gazetted as a Permanent Forest Reserve. This was after taking into account what the previous Government had disposed of. Its balance, I immediately requested permission and approval from all MMK members that I wanted to gazette it, and it was gazetted. Although the gazettement of 285.84 hectares is not a large amount, the way we did it is the first time in 40 years that this law has been applied in the State of Penang, land gazetted after 40 years. And this means that with the gazettement of Pulau Jerejak as a Permanent Forest Reserve, it has at the same time added 5.5% to the PFR areas in various places, namely from 5,100.93 hectares to 5,586.44 hectares, as at 2020. Here, we are also providing nurseries, because Penang encourages all NGOs and all agencies to take part in planting trees so that Penang Island can be made green. Although we face difficulties where many places have already been planted, we also look for places to plant, and this is one policy of the State Government where trees planted in places belonging to the public are given free of charge, and we also give advice on which trees are suitable and in which suitable places to plant, we also give advice in that respect. As for the question of whether there is encroachment, there is encroachment, and there is indeed illegal logging in the State of Penang to some extent, but this is by those who are neighbours next door. When they open up their land, they do not pay attention, and it opens up a little. And I have a list here that the matters recorded in the State of Penang are only a single incident. The forest offence recorded in 2016 involved the taking of mangrove wood from the Permanent Forest Reserve, about 50 logs, and we took action. Overall, a total of 14 forest offence cases were recorded from 2010 until April 2022, April 2022, which is in Schedule 2, which I will provide, because it is lengthy and I do not want to read all of it, and we have taken all action. The Penang State Forestry Department also carries out monitoring, because the area is so large and we only have 6 personnel for 5 districts. So we have used the latest technology, namely aerial monitoring using drones, as well as Forest Monitoring Using Remote Sensing (FMRS), which is an integrated satellite monitoring system developed together with the National Space Agency (MySA) to detect changes in land use. If there is any land use that is detected, we will be captured, and we will take immediate action. I think this is for risky activities in the areas involved. Are there any questions?
Tak ada.
If there are none, I will proceed to the issues concerning monkeys and wild boars that are still roaming about. Indeed, this is a matter that has to be addressed. Wild boar (Sus scrofa) and monkeys are protected wildlife listed under the Wildlife Conservation Act 2010 (Act 716). This is under a so-called control species, and indeed why they are now entering the main villages. The question is, who was there first? Who was there first? If there has already been an incident, we must address that issue. Setting that aside, indeed, there is loss of habitat for wildlife, the self-sufficiency and survival of wildlife species, especially monkeys, irregular rubbish disposal, which is one cause where many people eat and throw away the food near their houses, and when the wild boars have no food, they come out directly, and development that reclaims land without taking into account the aspect of wildlife, there is no food. By the State Government, where they want to build, the Department of Environment and Forestry, we ask them to make an inventory, an inventory of what trees are there, what animals, what birds, what species, including insects. We, if it is an environmentally sensitive area, especially in new places for developers. Abandoned land that is not cultivated, the attitude of a handful of wildlife lovers, and lack of cooperation from complainants. There is no cooperation from complainants. They call by telephone and do not give the location and other details that we need for wild boars. Indeed, there is a decontrol where its rights, our rights, on 1 July until 30 July, and in December there is what is called an open season. The open season exists to control population. I myself, until 30 June, is the probation period. Anyone who wants to hunt must apply for a licence, but this year licences will not be issued on the advice of the Ministry. The Ministry has, through a letter, a letter that has been forwarded to PERHILITAN, that in certain meetings, we will request that hunting and prevention are not the same, and we will prevent them if we receive any report that they have destroyed crops, disturbed and interfered with parks and villages, and we will destroy them. I appeal that we have cooperation from all these complainants, especially from the offices of the State Assemblymen where, whenever, so that we will take action. I promise this to everyone. This is very important. Right?
Hantar senarai.
Okay, Sungai Puyu. This issue has indeed come up many times and is indeed quite serious now, perhaps because development has been built in the area and the wild boars and monkeys have no more place, to the extent that I had to re-roof three or four of my houses because the wild boars jump, they jump from the trees onto the roofs, and the roofs have already rusted. Monkeys jump into the house, and there was one case, not a boar, a monkey, a boar jumped onto the roof. If I am not mistaken, it became a case in the YB's area as well, in Kampung Manggis, in Sungai Puyu, but that area is divided into two, one part Sungai Dua, one part Sungai Puyu. Kampung Manggis, a little child was bitten by a monkey. The monkey was angry, perhaps because its child had been beaten by children earlier, and it has a grudge, and it entered the house and disturbed the child. The child was admitted to hospital, I think for two (2) weeks, but Alhamdulillah, it did not take him up the tree.
So this matter is very serious in the Sungai Dua area, in the area of Permatang Berangan and also in Penaga, and in Sungai Acheh as well, and recently we discussed with the ICU to resolve this problem, and I saw the efforts made by the Department of Wildlife (PERHILITAN), Alhamdulillah, good, but there is a constraint of staff and perhaps also due to lack of allocation, which we will discuss again. Allocation for making cages or traps for these monkeys, that is only one method. These monkeys are trapped and then shot, perhaps the problem is one of pity. I once shot, not that I shot, someone else shot, I was there. The monkey fell, holding its child, it cried, it loved its child, it fed it milk. Oh, I said, ish, I cannot watch, I cannot watch. Monkeys are also animals that have affection for their children. So we may have to develop other methods, do more efforts, and there was one company in that meeting that was willing to come, catch and buy boars. That, I am interested in. They said they want to buy, they will come in and catch, and I will contact this company so that we can resolve the wild boar issue.
Okey.
In terms of operational shooting, it can also be done, but permission must be obtained from the police. So I think we must look at this together. The State Government also needs to look at it together, because this matter is now entering nearby villages, and it is not impossible that it will go to other areas, in urban areas. It is no longer afraid. Wild boars now are not afraid of people. Previously they were afraid, when they saw people they ran away, but now they are no longer afraid.
Thank you. I have a report that during the same period, after the case of the little child who was disturbed and harassed by a monkey, action was taken. I also visited the family and action has been taken. During the same period in 2019 until April 2022. The measures taken by the Penang Department of Wildlife (PERHILITAN) to overcome complaints of wildlife nuisance are based on the prescribed procedures and guarantee the sustainability of such wildlife species through the action of raising and catching and eliminating a total of 5,649 monkeys that have been caught and disposed of. For wild boars, it is 580. Therefore, when we see that the disposal methods were not effective enough, but permission was given as before, we only used shotguns. Now we also allow them to use the .22 rifle, which is further and stronger, and we impose the condition that it is only in the daytime, not at night, because it is in the village, and the safety of residents must also be taken into account. So, with the condition that whoever wants to hunt must apply for a licence, which is from 1 July until 31 December. However, because we face a challenge, namely African swine fever, therefore we have received an instruction from the Ministry that licences cannot be issued, and as I said just now, I said that at our meeting, we said the destroyers should be extended for the safety of village folk, and eliminate the nuisance and harassment. Not only that, we are working together with the forestry department. We also have suggestions for fruit trees that are suitable to be planted so that they have food. When they have food, they will not cause nuisance. Is that right?
For the year 2020-2021, two (2) additional firearms were added, namely shotguns, and two (2) .22 rifles for use by staff in the field. We are also working together with BPEN and are implementing an integrated programme for human-monkey conflict management in Penang, and a total of 18 locations have been given focus and implementation of these programmes. The innovation of the wild boar trap, the smart hog trap, by a private company can help and gives one of the conditions of effectiveness to reduce wildlife complaints, but now, because of African swine fever, all wild boars that have been caught or shot must be sent, whoever must send them, to the laboratory to be investigated to see what diseases are there. The Honourable Member from Sungai Dua also asked what programmes have been carried out to raise awareness and understanding of the environment, especially climate emergency. We said climate change, or now we say climate emergency. Through PGC, projects and activities in 2019 and until April 2020, through the Penang Green Agenda, we also have a renewal task force committee to strengthen Penang's energy, or renewable energy or energy efficiency (RENEE), which has been carried out. As the Penang Green Agenda is a state, the state especially, Penang Leads across Malaysia, we have the Penang Green Agenda. This will also be used as a model by everyone. I have just returned from Putrajaya to submit a report to the Minister. That is the effort of the Penang Green Council, and also it becomes a brand, namely that at that meeting, the minister praised the State of Penang as the first state to ban the use of polystyrene, and also the courage of the administration to protect the environment by raising the No Free Plastic Bag from 20 sen to RM1, where many, Kelantan has not yet implemented it, Pahang only 20 sen, other places did not dare to do it. We in Penang did it because we are responsible for protecting the environment for the state and the country. Penang also sends the Penang Green Council because many states to give briefings and guidance or share what we do in Penang. Not only for Penang, Penang is for all of Malaysia.
Request for clarification. Dato' Yang Di-Pertua, regarding Sungai Puyu speaking about No Free Plastic Bag Day. This is, I think, an effort that at first I was also sceptical, I thought how it would reduce the use of plastic and so on for 20 sen and now RM1.00. When I went to other states, say that day I crossed over to Kulim, I was also surprised that they gave plastic free of charge, and this has become a culture or practice of Penang people to reduce the use of plastic bags, if we have to spend RM1.00. But the answer I got from Sungai Puyu, also a written answer, states that from 2018 until 30 April 2012, we managed to collect almost, not almost, RM8.15 million from the No Free Plastic Bag fund, but just one request from me, this now is used for State Government programmes, especially welfare activity programmes in the State of Penang. I know Sungai Puyu's portfolio is two, welfare and also environment. If possible, I ask that money from this no free plastic bag be channelled to environmental programmes, or channelled to the Penang Green Council for them to carry out more environmental programmes, such as giving shopping bags free and so on, which is more appropriate in my view. Does Sungai Puyu agree?
I do not agree, because I also have allocations for the Penang Green Council, and whichever State Assemblyman wants to run environmental programmes, we have fully prepared them.
Tidak cukup.
Not used to requests. If there are requests, I can give. I can give consideration, but so far I have not been used to receiving applications from the Honourable Member. I apologise. With this, we, the Penang Green Council, are also involved in the government report on the impact of climate change in Penang. A carbon inventory framework project in the State of Penang. Public education and awareness, capacity building, and also awards and incentives involved with international programmes, namely, the Penang Green Council also has a brand, Abase Osaka, and has many times been invited representatives from the Penang Green Council to international stages to deliver working papers. This is achievement from the Penang Green Council, and we are also involved in the circular project, project circular cities, and here and from 2019 until 2020 we have received four (4) awards, namely 2019 JCI Sustainable Development Award 2013, Private Change Penang Green Council International Conference And Exhibition Larger In Northern 2019, MCBC Leadership Assessable Award 2020 Mansion Best Of The Leadership For Inclusion NGO, best achievement of State Government of Penang department 2020 and 2021. This is our achievement. Because this is long, I skip, but anyone who is interested can access it via https: https://pgc.com.my/2020/ and go there to see. I invite all State Assemblymen regardless of party, because I know everyone is truly of one heart to protect the environment. So I invite you to come in. I also want to invite all State Assemblymen and also officers who are here on this Saturday, we have "One Upon a Time for You". We will provide guidance to children so that they can join, please come to the programmes there.
Thank you. Finished? It seems it is finished.
Not yet. Just about to start. Welfare. Welfare matters from the Honourable Member for Permatang Berangan have questioned why, why the Jabatan Kebajikan Masyarakat (JKM) wants all recipients of monthly aid to renew their applications. This is a policy of the Federal Government, where the audit has conducted an audit and several states, Penang included, were found to have this issue. There are many recipients of monthly aid whom the Government has been returning, but their families did not inform anyone there and the payments continued. Therefore, after receiving this report, the State Government proposed to the Federal Government that there must be a notice, say three (3) months before expiry, that they must renew. This is not recent, not 2022, but 2016, we had already begun. 2016 had already begun.
But today you have only just asked me, from Permatang Berangan. It is as though this is an incident that has just happened, and they are questioning it. The Honourable Member from Sungai Dua wishes to ask a question?
I wish to ask. I understand that the Permatang Berangan Member is not disputing the issue of the review. This matter must indeed be carried out because if we do not conduct a review, some aid that continues to be given may be to someone who has already passed away, or who may already have moved out of poverty, yet we keep on giving. So this is something that needs to be done. But what I understand, in terms of the technique or method of this review, is that sometimes the Jabatan Kebajikan Masyarakat does not deliver the forms or letters to the parties involved. Sometimes these elderly people live alone. We must look at the groups. If these elderly people live alone, they receive aid, but they are not even able to do the letter. So there are certain ones, with permission, some of them we must help. JKM must look at the breakdown, make a breakdown. Okay, these are elderly people who live alone, or live with an elderly husband and wife, with no other children. We must look at them. We must help them again. There are persons with disabilities (OKU) who sometimes receive a letter, maybe it was thrown away and so on. When JKM does not receive the review application form, sometimes they simply stop it without us detecting it, and there are also those who are cut off immediately without notification. It is not all, only some. That may be a technical error and so on. So the concept of the review that has been raised, I think we need to carry it out. If not, all kinds of problems will arise. Some officers also sometimes have problems and so on. So there was a case, I know, I have the PAC, I looked at that case.
Jelas.
So, thank you.
Yes, thank you. I am not blaming JKM, but I want to blame certain ADUNs for this matter. The State Government's policy, we have indeed established a policy whereby here at the District Office there is a District Poverty Eradication Committee. It meets every month. We encourage all MPKKs to go down to the ground to make reports if there is anything, if there are any persons considered poor, they make reports. Penghulu will go down to the ground, JKM will go down to the ground to present specific cases, and at the meetings held. I have also given the list of JKM monthly aid recipients to all service centres. Why have they not paid attention? If they did not pay attention, why blame JKM? Why blame the District Office? Whereas the District Office provides a platform, one platform, one opportunity for everyone to present the problems of poverty in the district. Why did they not take part?
I think you should ask the Sungai Puyu side to give that list to us.
I have given it.
I do not have that list. Does the ADUN for Sungai Dua not have it?
Do not say that.
I did not receive it either.
Do not say that. In 2020, when I wanted to distribute food and boxes, I gave a list to every ADUN, because I gave food boxes based on the names on the list there. Name, address, IC number and also telephone number. If someone says they do not have it, that is not right. Never mind. I will instruct JKM to give it to everyone once more to resolve this problem. Here we are also talking about food. When it comes to food, people have questioned food issues. Indeed the State Government has given these food boxes through the Penang Mutiara Food Bank, which was established in 2017. We take food that has been rescued from producers and also supermarkets. All of this we take, and we give through the lists proposed by the MPKKs, which have been given at all times. In the time that remains, I will circulate data for all my speeches here. But there is one thing I want to give evidence on, because I have received a question. A question from Seberang Jaya. Here it is highlighted. The official question is here. Short and sweet. The question is: "What is the total allocation or donation that has been received by the Mutiara Food Bank Unit from September 2021 to April 2022?" My answer is short. "The total donation received by the Mutiara Food Bank Unit from September 2021 until April 2022 is 16,000 units of dry food, with details as in Appendix A, and an estimated value of RM79,520.00." But in this august House, my former colleague, my close friend. Today he is no longer a close friend, but right good people in the wrong house. Here I have given the report, but in this House he said, he said in reply about me, regarding the question "What is the total allocation for donations received by Mutiara Food Bank from September 2021 until April 2022", he read it out. It was stated that 12,000 units were purchased. My answer, when I have written it down, has already been given. And he also said, I checked my iPhone, and it turns out my calculator, I pressed the calculator too. RM79,520.00 divided by 3,200 units, one pack is only RM24.90. If I am not mistaken, the Honourable Member for Air Putih earlier said the Finance Minister gave even more, RM30. Now it is RM24.90. This is not true, and this is what is misleading in the House.
Dato’ Speaker, at the beginning of COVID, the Prime Minister announced that he would give RM22 million to welfare to purchase 1,000 food boxes worth RM100 each to all MPs in Malaysia. This would be administered by JKM. And my meeting also said I wanted to ask them to have a list of recipients so that when the audit comes it is a bit easier for us to carry it out. I also did not know how to do it. Suddenly, when it was time to distribute these food boxes. What happened? We received a letter from a minister. A minister, a Deputy Minister who is not related to welfare, instructed the Director of Welfare of Penang not to distribute them to all representatives from PH. But it could not be done. Thank God there was a little for DTL, because that office got it quickly, a little, it distributed 500 boxes to each MP in DTL. The others got none. In Bagan, none. Completely gone. Completely gone, and we also took one box to make a calculation. Its value was only RM30, compared with what was given by the State Government, for which I was interrogated for two hours by the Audit Unit. What was its value? Luckily my Special Assistant, before I accepted the offer from Sunshine. The list went together to three supermarkets, they took photos of the goods to calculate everything. And all the items in the boxes we took, their total value was RM60…(interruption).
Okay, Sungai Puyu.
But this needs to be clarified.
Quite clear, quite clear.
Tak terjelas…(gangguan).
Whatever is not right, just let it in.
It is still not clear. I want to know from him, friends, but principals. I believe that in the past he was not used to telling lies, but when he went to PN, I do not know what happened to him. Therefore I say….(interruption).
Honourable Member, not one…(interruption).
He is a good person. Good people in the wrong house. There is still a chance.
Honourable Member, I beg to interject, Honourable Member. Thank you, Honourable Member. I was actually waiting for the answer from the Honourable Member for Sungai Puyu. The matter I raised the other day was not misleading, because I only read the answer prepared by Sungai Puyu himself. The figures given are those given by Sungai Puyu. If you look back at my speech just now, Honourable Member, you read out everything, the transcript of my speech. What I raised was that the figure of RM24.85 should be increased to at least RM100. But what the Honourable Member chose just now was not to answer why the Mutiara Food Bank was supplied at RM24.85, the Honourable Member chose to answer by saying that the distribution did not take place. What did not take place may not have reached the Honourable Member. But I was informed that the distribution of food baskets reached eligible recipients and their value was RM100. So now my question is to the Honourable Member for Sungai Puyu: does the State Government, or the Honourable Member himself, his Office, agree that the Mutiara Food Bank unit's RM24.85 should, if possible, be raised to RM100, the same as that provided by the Perikatan Nasional Government?
Others need not, the EXCO has already answered.
He said what he does not know. He just speaks, to speak just to speak, so as to draw away the attention. The items given to the Mutiara Food Bank are collected, and where the ADUN offices or MPKKs apply, we pack them. This is not one pack that was given. These are donations that were received. Because you asked about allocation and donation. The State Government did not give any allocation to it. These are donations from the public. They are recorded in a book, and we do not pack one pack for them. There is none. Because you do not understand, if you were in this house you would be able to understand. Because you are not in this house, you do not understand at all and you talk nonsense outside…(interruption).
Okey tamat.
That is why, Honourable Member, I asked for an explanation. When I receive a written answer, Honourable Member, that is why I asked for an explanation.
Sekarang...(gangguan)
Now I understand.
Okey.
So it is not RM24.80, correct?
Bukan bukan…(gangguan).
Part of a larger amount.
Just admit your mistakes.
No, I am not…(interruption).
Anyone who is not used to making mistakes....(interruption)
What now, Dato’ Speaker? …(interruption).
Not asking. A statement. A statement, because asking questions is not the same.
Enough, enough, enough. I have also understood it. Quite clear.
Clarification. YB. Sungai Puyu agrees with me that the RM100 box provided by JKM from the Federal Government, in fact its real value does not even reach RM100. Open the box. The factor is misappropriation from the Federal Government. Thank you.
RM30.
That is not the responsibility of the EXCO. Okay Sungai Puyu, are you satisfied?
Not satisfied, I have to give an explanation. Alright, if I want to continue, it is possible I will take one hour here, because I want to respect Dato’ Speaker.
Terima kasih.
For anyone who wants answers to the questions I have not yet answered, especially from Pulau Betong regarding JKM, I can say that we indeed want to expand the dialysis centres. At present I have 14 machines. I still have 82 patients, which are operated by the State Government. The Balik Pulau dialysis centre. Where poor people only pay RM10 per treatment. Everything else, the supplements, is all given by the State Government. This is already operating, and because there are many more people who want to get this service and facility, we must expand. I will move JKM to the upper office, and the area below will be used with an additional 12 dialysis machines for this CAT dialysis. Therefore, for the rest, I will answer in the House or in writing to me, I will answer. I just appeal. Our country, our society faces very great challenges. After COVID, the challenges are economic and others. Let us all set aside political differences. Strive so that those entrusted by God fulfil their duties. It is better that I answer here than that I answer when I meet God. Therefore, I beg to support. Thank you.
Thank you for Sungai Puyu's kindness in keeping to time. I wish to announce that the House is adjourned and we will break for lunch now, and we will sit again at 2.00 p.m. Thank you to Sungai Puyu. The House was adjourned at 12.10 p.m.
The House resumed at 2.08 p.m.
Honourable Members, Honourable Deputy Speaker of the State Legislative Assembly.
Honourable Members, we are in the winding-up session. Datok Keramat is invited to speak, with the time allotted being one hour.
Thank you very much to Dato' Deputy Speaker, thank you very much. I have already touched on several matters in some of my oral questions, which I hope I do not need to repeat. If there are questions on that matter then ask, but today I would like to thank everyone in the house for allowing me to speak. I am happy to be here once again, to all my friends throughout this house in the house today thank you for having us it is an honored to be here and I think the biggest honour for me, I should say, is to extend my thousands of thanks and congratulations to the Penang State Housing Board. As you know, housing is close to my heart and I have seen a performance from the Housing Board, which was recently established, one year now, actually very time flies, which has already carried out many programmes that I will comment on somewhat in my speech, so congratulations to my team. It not easy Dato' Deputy Speaker not easy at all and they have done it and they deserve recognition they should commended and I do that and I want to put that on record and this is the first time we have the Housing Board that this year we will be moving forward with our own project that is extremely important. So I want to put that first on record.
Dato' Deputy Speaker, actually I have already touched on several of the most important matters that were asked by my friends on the side. How many have been built, what are our plans? I just want to keep it very short because I have already informed this House, it is not necessary for me to inform again, perhaps I will give a little more detail. I have stated, Dato' Deputy Speaker, 136,303 units of various affordable housing (RMM) are in various stages of implementation, 136,303 units of various type of affordable house is in the process…(with permission), Dato' Speaker. Now let me give you the details if I can, what I want to come to, I said this before but perhaps a little more detail. We have several types of affordable housing, as everyone knows. In Affordable Housing A, which was formerly the Low-Cost House, the number already completed is 18,310. Affordable Housing B, which is Low-Medium Cost at RM72,500, we have already completed 15,191, and various types of Affordable Housing C, namely up to RM300,000.00 on the island and RM250,000.00 on the mainland, number 12,400, which brings to a large total already completed in Penang. Our affordable housing of various types is 45,903 units, for your information. Those that are at various stages of construction, we have, I won't go through too much detail, we have all of A, B and C above, 18,354, Dato' Deputy Speaker.
In our plans there are 72,076. I said this before, I just want to repeat, give some details, and we will continue with this. One thing that I want to say today when I begin with this is that we understand it is not easy, even though we have affordable housing type A, which was formerly known as Low-Cost House at RM42,000, many cannot even access that. So the problem is we have to see how we can make them access it. I am already tired of discussing with the Central Bank of Malaysia, which does not respond on the issue, the first and most important challenge when I offer houses to them. They cannot get loans from banks. These people, if I may see, who come to my office every day and make complaints, Dato' Deputy Speaker, they receive very low salaries. It is unfortunate. So, it is a cycle, it is a very big cycle. Now in a worse economic situation, we need to help them more. So I asked the Central Bank of Malaysia what they are doing to help with housing aspects, affordable housing for people who need it? Some have salaries of RM500, RM600. What are we to do? And this is not today, this is already 10 years. When I raise this matter I may get angry, but let us be calm and collected and talk about it. But for 10 years I have been discussing this matter with four (4) ministers, and there has been no response. We need to ensure that the products we have reach the people and citizens who need them. So, if the Central Bank of Malaysia does not want to help us by looking at how to do it or looking at how to help them, then in Penang we will look at other methods. And we have already looked at that method. That is, we will implement a hire-purchase method. Where at this stage under the Penang2030 Vision, of the 220,000 units of various affordable housing that we will build, we have ensured that 10% will be done through the hire-purchase method, rent to own. Dato' Deputy Speaker, and for your information, my latest report on that shows there are many projects we have looked at that will lead to more than 3,500 rent-to-own units for the people of Penang to address the loan problem I mentioned earlier. I will continue, Dato' Speaker, to the others. Of course in Penang we have one constraint, which is land constraint. Now we have the Penang Southern Development (PSI) that will happen. That is 3 new islands, PSI. That will happen. But it will happen over a long time. Easily about ten, maybe 20 years. Half of us probably won't be here. We all hope, all of us will be here lah. But really likely, not. Now, so in between that, you see, in (PSI) Penang South Islands, it's called, we have many components including housing. So, when we have land constraints in the existing island part now, we need to see in that period how we can look after our citizens in Penang. So, how do we do that? So, one very good way is Urban Regeneration. I spoke about that, I think, yesterday. And that is happening, namely renewal. The only block that has 300 units can be turned into 5,000 or 2,000 units. 2,000 or 5,000 units. Depending on that block. It can happen. It can happen. And that is what we want to do in the meantime, if there are complaints from other parties, I want to know what the reason for that complaint is. Because this is a need for them, every house where we relocate them, we build another house from 300 square feet, we will build a house that is 700 square feet at least. Perhaps even bigger, with more facilities, and besides that, we give them one to one, free to the original residents. And then on top of that, Penang citizens who need housing also have an opportunity, because we have space for them, there are more units for them. That is the plan and it is going to happen. It will happen. And for everyone's information, I want to state, thank you again to the Penang State Housing Board, which has already made such strong efforts. Thank you so much, you all are doing very-very good job and in very-very short time. Because I always very-very angry and make sure things are done. We have a Master Plan for the Development Planning of the Penang State Housing Board. Which has a timeframe from 2021 to 2025. They started in 2021. Dato' Deputy Speaker, so it ends 2025 for this
first phase. And now we have 14 projects that we have planned, and of those, I want to state, Dato' Speaker, we have actually physically launched the first one in Bukit Gedung in Bayan Lepas recently with my Chief Minister. So, it is moving, we will continue with that. And there are many, every district across the whole state will be looked at. Also on the Seberang side, we will not, we will never ever neglect Seberang, remember that. We will be there and we are going to come down and step there on our new project. It will happen. Let me tell you, it's on the table, is being planned, we will be there. And for that, we also have various other projects, which I am going on to, besides planning RMM housing, we also look at how important it is, Dato' Deputy Speaker. I did not speak about this so far in my oral questions, but I think it is important to note. Besides the provision of affordable housing that I mentioned earlier, what is also important is for us to ensure the maintenance of all public housing schemes and also those that are eligible to be looked at, and I am happy to report to Dato' Deputy Speaker that so far, from 2008 until now, April 2022, we have spent just in Penang, RM297.57 million. For your information, in Penang under our funds, we have already allocated RM297.57 million ringgit…(with permission). Involving 32,582 projects in all eligible public and private housing. That is what we have done. Of course, this is under the four funds we have, namely one, Public Housing Maintenance. We also have maintenance under both local authorities, and also as everyone knows, under 80:20. But we help the private sector. So, I want to state that we will continue. I have heard from what I was told that some have requested regarding the maintenance fund, regarding the disbursement of funds and so on, we are looking at it. There is always a technical issue that needs to be clarified before that can happen. I can approve it but it will go through a process that needs to be done, that needs to be taken to the law. So I hope everyone understands. If everything is complied with, then we will start with those projects. Thank you…(interruption).
Dato’ Speaker.
Ya silakan.
Thank you Datuk Keramat. I am interested in the TPM fund because Batu Uban also receives a great benefit. So far we have received approval for 38 projects worth RM16.1 million. Thank you, I extend my thanks to Honourable Datok Keramat and the State Government. But I would like to make a small suggestion, if possible an improvement. Because previously, the JMB/MC would send 3 quotations and those quotations would be opened, and the State Government through the committee would make the selection, but recently that task has been given to the JKR (Public Works Department) to go and examine and also to call for quotations. And what happens is that mostly the costs become too high, for example for us to repair water tanks and so on. The costs are too high. And this will also burden the residents because residents have to share that 20% from the Management Fund. So, if possible we ask to go back to whatever formula we had earlier. Okay, thank you Datok Keramat.
Yes. Thank you to Honourable Batu Uban. We will continue, we will continue in assistance to Batu Uban and also all Honourable Members throughout the State of Penang. The issue regarding the JKR, we have already identified that there is considerable delay in the implementation of projects under them, especially they took over the largest projects under 80:20, namely lifts. And we have taken them back and now we hope we can speed it up. There is no issue about that. I think this has happened maybe about six (6) months already now. So, we will look at it, if there are projects that are still stalled, please look at them or meet me personally and I will look into that. There is no issue about that. So, Dato' Deputy Speaker, I will continue, when we do…(interruption). Please go ahead.
Honourable Member, thank you, thank you Dato' Deputy.
If the affordable housing title 25, 25 added already in..
The housing issue is settled. Only I want to touch a little on the rent-to-own issue just now. I congratulate and thank Honourable Datok Keramat, who is very considerate and sees that the majority of the people, B40 and M40, cannot afford it. For A and B, the applicants certainly cannot afford to buy. The RMM C houses at RM250,000 on the mainland. So, does the State Government intend to reduce that RMM C? Perhaps we could allow developers some leeway to make maybe RM100,000.00 to RM150,000.00 for C. Give a bit of special treatment to these developers. Their option could be to build RMM C like that. Perhaps RM150,000.00 and below is affordable for some. So, the next thing about RMM C is that it is indeed included in the affordable housing categories, meaning, if there is a developer who builds RMM C, they do not need to build A and B. Because they have built RMM C, that is what it means, right. Under the RMM affordable housing category they do not need to build A and B. They only build RMM C. For example, if the developer builds all RMM C, they do not need to build A and B. I want certainty on that, and second, in terms of the construction quota for A and B. Their breakdowns, I want to make sure, I want to request that if possible it can be given later too. How much is built by the private sector, A and B? And built by GLCs, PERDA, UDA, PDC, and those built by the State Government itself if possible. Perhaps now there is no longer any, perhaps the Housing Board will build. I think there are two or three places for that breakdown, and for private housing projects, is there a condition that they must complete RMM A and B first before the O.C can be issued? Is there such a condition? I heard rumours saying there is none, so I want certainty from Honourable Datok Keramat's side. We must make it mandatory, make sure they build A and B first before they can build the expensive ones. Developers sometimes build the expensive ones first so they can make a profit. Perhaps after a long time they apply to be exempted and so on. So that is also a request for certainty from Honourable Datok Keramat. But I emphasise again, T.Y.T. as people also said, rent-to-own we are trying to add, thankfully there are additions, and the demand from myself, A and B need to be increased. We have completed 18,310 and I think the applicants for A and B are far too many. I think perhaps there are more than 60,000, and some of them cannot get loans, that is the problem. But more than 60,000, I think they really need it very much. Thank you.
Thank you, Honourable Sungai Dua.
Thank you so much, my friend the Dato' from Sungai Dua, for your questions, which I always have to respond to because they are very sound. First of all, I will start with what has been stated, whether compliance or the condition to build low-cost and low-medium-cost houses applies to everyone, that is, to the private sector too. Your question is, yes. Indeed that is our policy: they cannot build if they cannot meet that. So that is one of our compliance conditions, number one. Number two, I want to state to all developers the breakdown in terms of Affordable Housing (Rumah Mampu Milik) A and B, which is a question connected with the earlier one; definitely we have it. It is 30 percent. That is our requirement. In the island area it is now 40 percent, which is 20 and 20, but still low-cost and low-medium-cost, and we make sure, just for viability, that they can breathe. It is not easy in Penang, that is why I started my conversations just now by telling everyone we have to move forward; we have to move forward. It is not easy but we will ensure we continue. And the most important question is your first question. Whether we want to reduce the price. Now, I think that is a question to which I must state that we cannot, because if I answer the previous two questions, indeed we cannot reduce the price; at this stage we set the price. In other states they have already reduced the price, but in Penang we are still at 42, we are still at 72 and still at various other prices. But for RMM C, perhaps we can look at it, and in fact Dato Sungai Dua, we already have one or two programmes or projects that we will look at to bring the price down to RM150,000.00, and we hope that will happen as soon as possible. Actually, I agree with the Dato' that if I could do even better it would be good, but it would become not possible, not viable, not feasible, so we have to be realistic. So that is why we have to move on, and I think your ideas are good. So at the moment, what we have to do is try to control the price. Other states have gone up to RM60,000.00, Dato' Deputy Speaker, for low cost. RM100,000.00, Dato' Deputy Speaker, for low-medium cost, that is not right. Penang will not do that; we will continue to safeguard the interests of the people and the citizens of Penang, where housing is our priority, and we will continue with that, and it is very important to maintain the price while other states are increasing it, Dato' Deputy Speaker. So may I continue? Any other questions otherwise? I want to state that earlier I mentioned maintenance. I want to state one thing, Dato' Deputy Speaker: when we talk about maintenance, we have almost reached RM300 million from Penang alone. For the information of Dato' Deputy Speaker, we have already applied to the Federal Government to also help us in this matter, and at the Federal level there are several funds besides the funds at the State Government, and at the Federal level there are two (2) funds, one is what they call the PPP and the other is the TPPM. We have two (2), now for the housing maintenance programme, the PPP and the Malaysia Housing Maintenance Fund (TPPM), I hope the Honourable Sungai Dua can assist. Today I have been hearing that you want to assist us, that is very good. For the PPP, we have applied for 73 works of which we have reached 19 approvals. For those 73 works, Dato' Deputy Speaker, the amount is RM50.35 million and the approval is RM3.5 million. The gap is quite big, that is a problem; I have just finished... (interruption).
I ask the Honourable Datok Keramat to give the list directly.
I will, I will. I just give the whole thing first then kita ada Tabung Penyelenggaraan Perumahan Malaysia TPPM 126 projek kita minta pada RM84.4 juta sekarang daripada 126 projek itu, cuma 22 sahaja yang kita terima kelulusan pada RM4.95 juta daripada permintaan kita RM84.4 juta. Secara keseluruhan Dato’ Timbalan Speaker, I just put that on record, yang kita telah mohon kepada Kerajaan Pusat adalah untuk 198 projek. We have applied for 198 projects to the Federal Government for the maintenance of housing scheme in Penang at a cost of RM134.76 million. Kita telah pun pohon untuk 198 projek di bawah tabung-tabung di bawah Kerajaan Pusat yang berjumlah RM134.76 juta dan yang dibenarkan ataupun diluluskan adalah cuma 41 setakat ini pada harga RM8.48 juta. So saya harap kita dapat kerjasama kerana saya selalu nyatakan perumahan tidak boleh dipolitikkan dan apabila kerajaan kita sudah pun buat apa yang kita perlu buat sekian lama ini, saya harap menteri yang terbaru yang keempat untuk perumahan dapat mendengar dan melihat kepada bagaimana boleh bantu especially apabila dia satu anak Pulau Pinang. So saya hendak teruskan dengan beberapa perkara lain ada dalam perbahasan kita nyatakan apabila Ketua Menteri saya nyatakan kita sudah capai 90 peratus daripada apa yang ada dalam Manifesto kita. Saya begitu bangga bahawasanya itu berlaku kerana ia berlaku dan saya ingin nyatakan kepada mereka yang ada syak sangka terhadap itu untuk bangkit dan bangun dan dengar dan lihat dan baca apa yang berlaku. Harap kamu pun boleh buat supaya kita boleh pergi ke 100 peratus. Jangan buat pertuduhan liar. Bagaimana boleh kata kita tak. Untuk makluman semua, saya beri portfolio saya. Saya ada tiga (3), saya nak beritahu apa yang kita telah buat. Bukan 100 peratus, mungkin lebih. Daripada perumahan Dato Timbalan Speaker, saya kata tadi 75,351 unit, hari ini kita di 136,330 unit. Siapa nak cabar saya dengan nombor itu? Nombor satu, kalau kita hendak lihat pada penyelenggaraan saya tak mahu repeat apa yang telah saya nyatakan. Selain daripada apa yang telah kita janji, kita telah pun selesai banyak program yang mana status pencapaian semasa adalah 52.59 juta dan penerusan keseluruhannya yang selain adalah 244 juta. So this is very important to put on record. Don’t just come and make claims that they are not realistic. Not based on facts, always say things based on texts. Kita telah pun ada banyak projek seperti rent-to-own, this is just under my housing as I’ve already mentioned kita sudah ada 3,510 beyond the Manifesto. Kita punya Manifesto akan berubah dan akan menjadi lebih canggih very soon. We are seen better things to come but don’t say that we have not achieved that 90 percent because I believed under the Chief Minister leadership, we have achieved more than that and I can give you the whole spectrum of other initiatives. I want to go now to a few of my ADUN, Dato’ Timbalan Speaker who have mention a few things and this is part and parcel daripada apa yang dinyatakan tentang manifesto. It also a part of the parcel. Inisiatif bandar pintar kita. Kita lihat daripada soalan daripada Yang Berhormat Air Putih tentang agenda negeri pintar kita. Can I mention to everyone that we only have in mind initiative kita akan sampai kepada mungkin 90, pada akhir tahun sudah. Sekarang pada bulan ini, kita sudah sampai 102 inisiatif pintar. We are the highest in the while of Malaysia. I hope you understand. Ini telah pun melangkau mencecahi manifesto tersebut. So, I want to understand what it is you talking about. Let me know, come and see me, no issues and if I want to go through it Dato’ Timbalan Speaker, I will go through it until dinner. So, I mean we got pemasangan CCTV, sudah buat. Penukaran lampu jalan LED sudah buat dan sebagainya ada banyak. Ada banyak. Banyak tempat, I don’t want to mention the places that is what is happening, and I think I just want to
mention one thing on this issue. Saya gembira untuk nyatakan bahawasanya ingin saya beri juga satu tepukan kepada team saya daripada Kerajaan Tempatan. Mereka sudahpun bekerja bertungkus lumus, not easy. You know we have having solar panels; we are having LED; we are having CCTV all this is very import why? You can do more numbers, it's okay la. You know the number will continue tetapi mengapa? Kerana kita dilanda cuaca iklim, krisis iklim. So, ini perlu dibuat dan inilah yang sedang kita buat. So, jangan cakap yang sedang kita tak buat. Walhal kita sedang buat dan akan terus buat. Let me get that very clear to everyone here and to all Penang eyes. We are here to ensure that we will address the climate crisis. That is our number one problem today and that is what we are doing true our City Council. Dato’ Speaker, if i have to go on. Ada pun banyak yang lain. Pulau Burung. I don’t see any of the YB is here and I think only mention.
Jawi is here.
Any question from you for that?
From where, Pulau Burung?
He solve the problem already, so no question.
No problem, just regarding the interim contractor or interim contract tender. There is a problem; we need to look more carefully at the contractors that we will select in future. Thank you.
Terima kasih kepada Jawi. Thank you so much. Kita ada satu soalan daripada Sungai Dua. So, I think very important one. Berkenaan homestay. I think I want to talk about that a bit today, if you don’t mind Dato’ Timbalan Speaker? Because thata one I didn’t to speak yet. Saya hendak beri sedikit penjelasan tentang isu ini. Homestay adalah satu isu ataupun satu perkara yang dilihat daripada pihak Persekutuan iaitu MOTAC. Mereka yang memberi lesen kepada homestay. Now, homestay kita ada banyak juga di Penang, di merata-rata tempat. The issue is short term stay. Itu berbeza, berbanding banding beza dengan homestay. Sekiranya kita duduk di satu apartment. Complaint yang lain yang mari kepada saya selain daripada warga asing, sekarang jadi holiday, jadi hotel. Setuju atau tidak? Tell me. If you live in an apartment but I think all of you live in the bungalow. If you live in a apartment, will you agree with that? Sememangnya tak boleh dan saya akan pelihara mereka juga. Tak boleh. Mereka datang satu dua hari sebagai hotel, tak boleh. Kita ada banyak hotel di Pulau Pinang. Dan oleh demikian kita sedang memuktamadkan garis
panduan kita untuk short term stay di mana kita akan tidak benarkan mereka buat sedemikian, tidak akan dibenarkan. Let me tell you that, that is my view and that is the view that I take because that is majority view from the people. They don’t want this. In fact, kita sedang gerak ke hadapan untuk lihat kepada landed properties. Landed properties sudah pun kita lihat ada isu perundangan. I'm looking into it, but its not right, it's not right. You get people coming to your neighbour house and then they make the raucous, kacau ganggu itu, you want that? No. It will not happen under my watch. So, itulah apa yang saya hendak nyatakan. Ada apa soalan daripada Sungai Dua?
Thank you, Datok Keramat. I do have a question, an oral question on homestays, but what worries me is one issue about this homestay. We have homestay projects under PERDA, under tourism. So, we have 10, earlier 11, now only 10, and we will add another 3 or 4. Which we build in village areas. Datok Keramat, it has already been made clear that this does not involve the village stay projects at all. Village stays are built in villages with the aim of developing the village and also the economy of the village community. I think there is no problem; it has been explained that there is no connection with short-term rentals, this rental. However, there is the part on landed properties; I also do not agree if high-rise strata units are made into homestays. I have heard of cases of wild parties being held in homestays. So this really is a nuisance. Perhaps this... But if these guidelines are handed over, the power or the decision will rest with the JMC Committee, the management body in that housing area. If the majority agree, they can request whether leniency can be given there? I really do not agree at all, if possible, I do not agree if strata houses are made into homestays if there is leniency, if there is such an application, and landed properties, if possible, should be given a little leniency or room for them to do it, because I also take into account some residents who bought houses, who bought them themselves, not low cost, not low-medium cost. They built the house themselves, so, perhaps they are people who have village houses, they do not live in that house, perhaps they want to run a homestay. They want to rent it out, maybe for a month at a time, the income is low. Renting it as a homestay gives them more income. Four or five times a month, people rent it as a homestay, people come from outside for weddings and so on, they also earn income. Perhaps landed properties can be considered, and thank you for the fact that village stays are not involved in the guidelines or directives that will be issued.
Terima kasih Dato’ Timbalan Speaker, terima kasih kepada YB. daripada Sungai Dua atas pandangan berkenaan homestay. So, I repeat homestay dengan short stay is totally different. Dia berlainan, ini adalah homestay, penginapan sementara adalah berlainan. Homestay is allowed Tiada masalah. In fact, even homestay ada masalah walaupun dibenarkan ada license. Short stay is not even dibenarkan. So, kita ada garis panduan yang akan datang yang mana kita akan lihat kepada semua isu yang telah dibangkit oleh Dato’ Sungai Dua. Definitely we look into it. You see when you buy a property, apabila kita beli suatu tempat perumahan kita itu, kita ada perlu ada kebertanggungjawaban terhadap semua yang tinggal dekat kita. Please let me say that tak adil kepada mereka kalau macam jadi hotel ada, like you say ada party juga and all this is happening. This is the problem that we have to solve. Dan memang kita sedang lihat at the moment like I said garis panduan kita adalah untuk high rise bertingkat dan kita akan lihat kepada landed kerana ada isu perundangan dan kita akan lihat tetapi mereka juga ada banyak aduan yang mana kita sudahpun ambil tindakan on landed. For your information Dato’ Timbalan Speaker, di Batu Ferringhi actually action was taken on the landed properties in Batu Ferringhi,
but we are looking into having a guideline and that guidelines need to have some legal background as well. So, we are looking into the legal picture as well. Tetapi saya harap semua faham bahawasanya ini perlu ditangani kerana Pulau Pinang menjadi tarikan dan kita you know, you see that last two years. In fact, kita punya kajian was before pandemic, tetapi selepas pandemik semua orang sudah masuk. Today, I'm sure you also will caught in a traffic jam. Everybody is in Penang. So, that is why we have to now move on, with it although we didn't do it for the last two (2) years dan we are going to do it because it is important for the people of Penang to have their security as well. You don’t need outsiders coming in to disrupt your peace, that is the reason why we are looking at it, Dato’ Speaker…(gangguan).
Yes, excuse me, let me pass. Thank you, Dato' Speaker, and the Honourable Member, Datok Keramat. I very much agree with the action to be taken for short stays, because I too live in an apartment. I understand the security issue, because many scammers also happen to rent these short stays to carry out scam operations and so on, criminal work and so on. But in my area, I also want to ask whether, under these guidelines, this also includes the units categorised as SOHO units? In my area there is an Altis project in Bukit Gambir, where they too have experienced issues of short stays, homestays and so on. The management could not take action because we do not have a guideline, and eventually they brought the case to court, and I also received a notice as the State Assemblyperson for the area. They said I also could not help with this issue, but I had given an explanation, and I would like to request whether SOHO will also be included in this category? Thank you.
Thank you so much to Batu Uban for your question. Actually, regarding short stays in such places, indeed SOHO has from the beginning had many problems; it has been misused as hotels. We all know all that, and of course with what is happening now it is on our radar. So, we will also look at how we can control those areas too. I have a few other matters as well. May I continue?
Yes, you may continue.
I have a few other matters, I think a few very quick ones, for the Honourable Sungai Dua, who also asked about our community activity centres for residents, how we can build markets and so on. Indeed, both City Councils, not only in Penang but also on the Seberang side, are always looking at how we can improve what already exists, and also at how we can, whether we can build new ones. It is not an issue, but if there is input from the Honourable Member, we are waiting to receive it so that we can put it into the new project that will take place. I will give the details to the Dato' Sungai Dua.
Teher is one important question from the Dato' Sungai Dua, and if I may, I would like to respond a little regarding the operation of factories within the Local Authority area, where they have issues concerning zoning and so on. Now I think that is a very good question, where we look at how we can carry out the whitening process as quickly as possible, and we have two important documents coming up, namely the Seberang Perai Local Plan and the Penang Local Plan. The Seberang Perai Local Plan indeed takes into account all such places, so that we can look at how they can be whitened. There are many places, Dato' Sungai Dua, which have already become industrial areas, and we want to see how we can include them in this official document as quickly as possible, and before that, how we can whiten them, and that is in process, and we hope it can be done as quickly as possible, Dato' Sungai Dua... (interruption).
Honourable Datok Keramat, I would like to add a little to my question. I want to mention the whitening of illegal factories in Seberang Perai. There are many illegal factories that are sometimes built in paddy field areas, areas beside rice fields, areas beside rivers, which are not in shop areas, like in Sungai Dua itself, Taman Desa Murni, there are indeed industrial lots that I see are not suitable, heavy industries, lift-making industries, helmet-making industries and so on, which are close to people's houses, but there is no pollution, only the metal sometimes scattered along the roadside. But for illegal factories beside rice fields, such as in Sungai Maklom, they make joss paper, funeral prayer items for the Chinese community. The ink, they dump it into the river, the ink from the paper that is written on, they dump it into the river. One day people complained that the river had turned red, and I said, why has the river turned red? When I went down with the Department of Environment, it turned out that the factory was dumping the excess ink into the river, causing some pollution in the area, but it goes all the way down. Now, if we want to whiten illegal factories like these, will we keep them there, since it is not a shop area and not an industrial zone at all, or will we relocate them to an industrial area, perhaps relocate them to Sungai Lokan, so we give them Sungai Lokan, so it is not too far from the nearby industrial zones, or perhaps to a new industrial zone that has just been created in the Local Plan? I see there is a new industrial zone; please do not place them there, and do not whiten them, but if they are kept there, that is the problem, so if possible, look at it from that angle. Only one or two factories there, if the factories there are whitened and kept there, they will disturb many paddy fields, disturb all sorts of things, thank you.
Thank you to the Honourable Sungai Dua for the question. Indeed, we are examining many applications for regularisation, but every application will have to go through a process where we look at whether they have met the requirements and conditions and so on. But the bigger picture is that there may be places where many have already been... which we want to look at whether they can be regularised, or because it's already there, but maybe for this case I will look at Sungai Maklom and I will study what has happened. Regarding pollution, I think this is a very important issue that Dato' Sungai Dua raised earlier. I will recommend to MBSP that it take action to conduct a review and take action. Can I proceed, Dato' Deputy Speaker of the House? I have one more question, which is on Development, a very interesting question.
Also, my friend from the Honourable Sungai Dua, thank you for the matter regarding the provision of bicycle lanes in the Seberang area. Actually, we have a programme to provide bicycle lanes across the whole of Penang Island, which has already started. We have started from Queensbay up to now, up to Komtar, and we have a route, of course not complete but in stages, all the way towards Batu Ferringhi. And we, actually I, we have already applied to the Centre for some funds for that, because the road there needs to be built on the seaside. So we need to have that pedestrian walkway together with the bicycle lane that's on the sea, literally... (with permission) Dato' Deputy Speaker of the House. So we are still waiting for that RM40 million that we have requested, still waiting. Perhaps Dato' Sungai Dua can help, because that was the question from the Honourable Sungai Dua, and that is what we want to do. In the Seberang area, we are indeed identifying, in fact there already are, our former Datuk Bandar has already built many bicycle lanes and pedestrian walkways in the paddy fields and so on, there are already many, so we will continue with our efforts to expand what we already have. It is a very good question, but this is important and I will look into it, Honourable Sungai Dua, thank you very much. If there is no question, I will proceed to my next very important question, this one Dato' Deputy Speaker, from the Honourable Air Putih. I think this morning, what is the difference between Seberang Perai Municipal Council (MBSP) becoming Seberang Perai City Council? It is a very important question, and I would like to give a little commentary. There are many, there are many differences for us to become a City Council. Many things we must comply with, first of all, apart from what, unfortunately during the pandemic, I think they could have managed much better, but unfortunately not everyone is in that position. But for us to become a City Council, first, we need to increase the population, and we see from the economic growth in new areas such as Batu Kawan, which will certainly increase the number of new residences to meet the needs of the energy and industrial workforce and residents in that area. So far, for everyone's information, the population growth rate of Seberang Perai is 2.2 per cent for the year 2020, which is around RM1 million in 2019, 1,085,000; 2020, 1,108,000. This is the information that I have. To increase the total annual revenue since MBSP was declared a Council, there has been an increase of 4 per cent in revenue for 2021 compared to 2019 and 2020, where we see an increase in the number of residences in new areas such as Setia Fontaine and Bandar Cassia, with local authority (PBT) assessment tax revenue expected to rise once all the residences are completed and occupied. So we have an increase in revenue too, Dato' Deputy Speaker of the House, so I think it is important to also note that the total annual revenue of MBSP that we had in 2019 was RM286 million; 2020 was RM258 million and 2021 was RM299 million. And of course we have improvements to the service delivery system, which is the most important, where we have already improved the quality of service at all MBSP counters, where 100 services are now already online. And we also look at new growth centres, where we have seven (7) new industrial areas that we are looking at in the Seberang Perai area, which look at the justification for why it should become a City Council: Bertam, Jalan Siram in Butterworth, Kampung Hujung Baru, Bukit Juru, Kampung Hujung Bukit Juru, Penang Science Park, Bandar Cassia, Byram and east Batu Kawan. Now these are very important facts for us to justify why it can become a City Council. On top of that, we have many other things that have already happened, such as the provision of urban services, infrastructure facilities, public utilities and so on.
As for the installation of CCTV, as I said just now, the replacement of lights with LED, the installation of solar, and our recycling rate is the best in the whole country in MBSP, and I think these are the benchmarks that justify what has happened for them to be given that recognition, Dato' Deputy Speaker of the House... (interruption).
Honourable Datok Keramat, please summarise, one hour already... (interruption).
I know my time..I know just let me say just few more but I think the rest I can only..gangguan…sekiranya ada soalan daripada sesiapa saya…(gangguan).
Honourable Datok Keramat, thank you. Perhaps it is not necessary to comment, but I want to touch on two (2) matters to which the Honourable Barisan and I have received objections. One, objections regarding development construction in the Bertam area. I know Bertam has already become an industrial area that has not been developed for a long time. Objections regarding the construction of an industrial area, industrial lots, and also residential areas or CLQ in the same area of two lots, there are two developments: industry and centralised quarters development. These objections were raised by many residents and the AJK took action, and I ask, please, please, from the side of Datok Keramat to look into this issue. Although it has not yet entered the Local Plan (Pelan Merancang), I think it has not even entered the Local Plan. Only, these residents got to know about this matter early, they raised it, made it viral and so on. However, I too do not quite agree if we place it there because the area is full of residents, many houses and so on, and it will become many issues like those raised in Bayan Lepas. If it can be considered, because under the Akta Sumber Manusia, the Ministry of Human Resources (KSM) must do this, must do it or can be done, in the view of the Ministry of Housing and Local Government (KPKT), it is not included in the requirements to build there, so it can be reviewed again, looked at again, discussions can be held together. What do we call it, sit down and discuss? Engagement before implementation, conduct engagement to discuss development in Bertam, quarters buildings, workers and industry. And if possible, the industry perhaps should not involve industries that cause pollution, industries that are rather sophisticated, quite advanced, there is none, there is no sewage, no discharge and so on, no smoke pollution and so on, which may be quite unsuitable for the surrounding residents. Second, regarding the second objection we received from Jalan Sheikh Madar in Air Itam. I also do not know the cause. It turns out that the land is council land, MBPP land occupied by houses built by MBPP and rented monthly at RM75, so they asked for objections so that it would not be developed, no development done and all sorts of things. However, I have understood this matter, if possible we can settle it, we have already conducted engagement with some of these residents, and some have already agreed to move out and so on. However, some have not accepted, perhaps we can look at the benefits for both parties. Perhaps there is room to be given new houses here if the development is carried out, given houses with perhaps a slight price reduction and so on, and perhaps also given suitable temporary accommodation before being moved there, and we understand that this matter is related to area development. Perhaps to avoid flooding and so on, so these are matters that need to be looked at and discussed so that all parties benefit, the State Government as well as MBPP benefit, and it is resolved, the residents there have been there for quite a long time, there are also benefits and what they receive from the proceeds of that development. So this is what I need to include also in this winding up, thank you.
Three people want to speak. You from the beginning.
Thank you, Dato' Speaker, thank you to the Leader of the Opposition for raising the issue. I also wanted to ask about Kampung Sheikh Madar, and thankfully after the protest objection held last Monday, I met Dato' to inform Dato' about the real situation, and due to Dato's concern, the actual matter was then conveyed, because as the State Assemblyman (ADUN) I should not still not know until today what project will be carried out, but the residents there have heard rumours that they will be driven out. So, I hope here that the State Government or MBPP can give an assurance or a clear picture of what we will do there so that this solution can be managed, thank you.
The same title?
No, no, what is that... (interruption).
About houses too?
Earlier, the Honourable Datok Keramat mentioned the issue of complaints regarding homestays and so on, and that too was not as many complaints as the objections to the construction of the hostel. But on this occasion, I ask for cooperation from the State Government, especially Datok Keramat, if we follow the Guidelines (Pekeliling Garis Panduan) issued by the Penang State Town and Rural Planning Department itself in 2017, I think there will be no problem, and I will not oppose the development of the proposed hostel construction, among others, Datok Keramat, you may refer to page 4, site planning: "Workers' hostels are only permitted within commercial zones and industrial zones, industrial zones are only permitted in light and medium industrial zones only. Secondly, the permitted zones are intended to reduce traffic congestion and workers can walk to their workplaces." There is a lot more if I were to read, but just mentioning zones, for example at 1435 and 1437, the original zone was a general residential zone, but to make it legal it has been rezoned to become general commercial, so I think this is unfair to the residents there.
And secondly, if we look here, residential zones are not permitted if they cause various problems, and there is also no buffer zone, a buffer zone between, for example, if there is a floor in Teluk Kumbar, there is no buffer zone between the proposed compound area to be built and the existing residents. So I ask the State Government, if we just now could accept public complaints about inap desa and so on, homestays and so on, we ask the State Government also to refer back to these guidelines, and if possible these guidelines should not be changed repeatedly, because if they are changed it becomes difficult, if we follow personal preference or want to let it happen, so I ask, I am confident the State Government will not disappoint our hope that we can live in peace and harmony, InsyaAllah, thank you.
Excuse me, I ask permission to add a little on the issue of the memorandum of objection raised by the Jalan Sheikh Madar Residents' Association. I did debate this issue, but at that time the Honourable Datok Keramat was not in the House. But perhaps I can add a little on the grievances and complaints brought by a group of representatives from that association, which relate to renewing the tenancy agreement, where each time the original rental period was three (3) years, but when the three (3) year period ends they are asked to renew it on a monthly basis. So this is what causes difficulty for the residents there, having to go back and forth to renew it monthly, so perhaps a better method can be discussed to make things easier for them, thank you.
May I give a little commentary, Dato' Deputy Speaker, thank you, thank you. To all who asked questions, regarding the first one on Sheikh Madar in Air Itam, we indeed know what is happening there, it is land owned by Penang Island City Council (MBPP) where we perhaps have plans, but nothing has been decided yet, only in terms of planning, but if it does happen it is one of our urban regenerations, where I am, I am sure and confident that those who live there will get larger, more comfortable units. That is the objective, aspiration and vision of ours when we undertake projects like this. But I am still discussing with Penang Island City Council because this is their land, and we will see what happens. Regarding what the Honourable Permatang Berangan stated just now, I hope you can understand what we intend, which is for their future good, their children's future and so on. That's what we are doing. We must move forward, that is what we are doing in Penang. For Sheikh Madar, also thank you to Air Itam, I often receive input from the Honourable Air Putih regarding what is happening there, and we are monitoring constantly, what happens, and we will always take into consideration, we will consider all the complaints from the residents there for us to consider, and I think our State Government's approach is always ready to hold engagement so that we can hear those complaints, because perhaps they do not have accurate information, or the information needed by those involved, so that we need to advise them on what we want to do, number one. Number two, Dato' Deputy Speaker, regarding what was asked earlier, I think we have many questions regarding... (interruption).
Bayan Lepas. Dormitory.
Sorry.
Bayan Lepas dormitory.
Yes, I am coming there regarding the construction of the workers' hostel, which I want, I want to resolve now. I have already stated our position, there are many complaints from the people and citizens of Penang about foreigners living in housing schemes, there is too many complaints by Penangites on foreigners staying, foreign workers, staying in their housing scheme. So, that is why we are doing this, there is no other reason, that is the only reason, and we already have two (2) that have been completed, and for the record, and I have to put it on the record, we have in our consideration 10 other schemes that we are looking at but have not been approved at all, and most of them are in Seberang Perai Tengah, I want to state, seven (7) projects in Seberang Perai Tengah, in the South West District 3 projects, in the North East District one project, none objected, none objected. All asked for it to be expedited because they know what is happening. So I hope Bayan Lepas can understand. Wait! Hold on, I'm not, sit down, sit down, sit down first, I tell you to sit down. So I hope this can be made understood and I hope everyone can hear what Bayan Lepas is going to say now, because if not, it is because of our Honourable Member there, but the majority want projects like this, no other YB objects. I want to know actually what is the problem? You can always come and see me and talk about it properly.
I also don't understand who is objecting, when residents have held demonstrations, we have submitted a memorandum, and I myself have met the CM and so on. Who is objecting? We are not objecting to the plan itself, which is a good plan. I understand that building accommodation for foreign workers is indeed good, but what we are opposing, what we do not want, is for the site to be unsuitable under those proposals. That is why I say, look again at the 2017 Guidelines of the Town and Country Planning Committee (Jawatankuasa Perancangan Bandar dan Desa), revised in 2018. They do not state the many problems that will arise. There is also a provision that this construction should not take place in residential areas or in villages. And it is proposed that it be built in industrial areas. Not in areas where people already live? So if there are already guidelines, why not follow them? If we feel we want to do something good, we should follow the guidelines that we ourselves made. This is going to bring up to 35,000 people. One bus carries 40 people, so if it is 20,000 people, that is 500 buses per shift. That is what we do not want. What happened at Permatang Damar Laut? What is the problem there now? Factory buses park outside, disturbing the public, and people keep complaining. So we do not want these things to happen in our area. And also there is no area, in Tingkat Teluk Kumbar for example, there is none, it's as if there is no border at all, it sits right next to where people live, low cost, low medium cost. Where is the buffer zone? That is what we question. We do not mind if it is built in another suitable place that does not disrupt life. We also have Penang2030, for liveability and so on, but we say, as I said, talk should be matched by action. We must do our best. So I ask the State Government's cooperation to give priority to the people of Teluk Kumbar, the people of Sungai Batu, and the people of Barat Daya. We too are citizens of the State of Penang, and we also want the economy to run well…(interruption).
Thank you, Bayan Lepas.
Minta laluan.
In the Bayan Lepas debate, this issue has also been raised. I ask Datok Keramat, if possible, to hold a meeting together with the government and the departments concerned, and reconsider it.
Deputy Dato' Speaker.
It is regarding Byram, I mean Bayan Lepas?
One minute.
Regarding to dormitory, workers' dormitory.
I think EXCO can answer the question.
One minute. I just want to inform this august House. We understand that, I think in 2016 or 2017, indeed a workers' dormitory, not for foreign workers but a dormitory for factory workers, was started in the Bukit Tambun area, on Jalan Bukit Minyak. At that time, I was a Councillor sitting on the OSC committee. There was indeed a lot of objection from residents around the neighbourhood. I think Honourable Tambun could also be a witness, and at that time people were indeed worried. But with the design and the planning, the planning under what Bayan Lepas just said, I think with the complete conditions for this workers' dormitory it is indeed important and will indeed benefit especially the residential areas where I often receive calls or complaints, where residents lodge complaints about foreign workers living in various housing estates. Especially, do not forget, during the Movement Control Order (PKP), we received calls every day. Honourable, Honourable, these foreign workers have run out, they have already run out, they are not staying at home. There are many, especially in Taman Bukit Panchor, Lorong Empat, Lorong Lima, Lorong Enam. More than 30 houses have been turned into workers' dormitories. As the State Assemblyman for the area, I also welcome it if investors who want to invest or who want to build foreign workers' dormitories can come to Nibong Tebal, Bukit Panchor, because the Bukit Panchor area also has the Bukit Panchor Industrial area. I do not want the problem of foreign workers living in housing estates and residential houses, which would bring big problems to the local residents. Thank you.
Mr Speaker, I want to…(interruption).
Right now, Jawi has already offered, that's good. They have a different idea.
Bayan Lepas, we must remember that there are locations, localities, in Bukit Panchor, and Bayan Lepas is quite far. If you want to stay in Bayan Lepas, it is difficult to take a van from Nibong Tebal…(interruption).
Try looking at the guidelines.
Everyone is requested to sit down.
Why do we want to look for trouble? Why do we want to look for trouble? The places are not the same, the locations are not the same. Datok Keramat may also have offered…(interruption).
These guidelines, the OSC Committee will refer to all the existing guidelines. We have…(interruption).
If all the guidelines are to be changed, it would be better not to make guidelines at all.
The EXCO will respond.
No, we are bringing the voice of the people…(interruption).
Try to wind up as soon as possible.
Please, go down to the ground and see what needs to be done.
There are several other issues I would also like to end with. Thank you for your views, Bayan Lepas. We will always take them into account, but I believe that our agenda to place our workers in one place, in a controlled and orderly environment, is a good agenda because this is the request of our people, and we will continue with it. Don't worry, if there are issues regarding the conditions in the guidelines, let us know, but these guidelines have already been tightened. And it follows not the conditions of Malaysia, in fact Malaysia follows Penang because Penang follows international standards. Do you know that or not? I don't want you to say…(interruption).
As a government, we must also follow the views of the people. We cannot just follow ourselves.
I’ve heard that so agreeable move on, I’ve few other things to speak about.
Honourable Member, it is already 1 hour 22 minutes, can you summarise?
Perhaps one issue, if possible. Just give me a couple of minutes. Almost there. I also want to say that our agenda in Local Government, Dato' Deputy Speaker, is also important in terms of looking at the climate crisis that is affecting not only Penang, not only Malaysia, but the whole world. I want to give a salute to them because of tree planting in Penang. We have reached 421,932 trees across all five districts in Penang. We've already reached that, Dato' Speaker. And of course, our target apart from the 421,932 that has been done since 2008 until now, we have a target which I think we will also exceed, which shows that our manifesto has indeed already exceeded 90%, where every year we will plant 100,000. But we have already reached it, and thank you to the departments and agencies that have done so, because to me this is very important now. And this is something that must continue. And of course, another thing, just to finish off in relation to what we call the climate crisis. One more thing: recently, we had previously intended to rate our buildings in Penang, namely Green Buildings, and we have a recognised rating, namely the Green Building Index. But I am pleased to state that after discussions were held, we have now recognised several other what we call ratings. So not only GBI (Green Building Index) but others such as GreenRE and so on will also be introduced for recognition, which will lead to us seeing more green buildings in the State of Penang. That is what is important in the context of what is happening in our climate crisis. Thank you very much, Dato', that's all I have to say, I respectfully ask to support. Thank you very much.
Thank you, Datok Keramat. Padang Lalang, you are invited to speak.
Thank you to Mr Speaker. First, I would like to thank all parties who have always stood with the State Government of Penang in efforts to empower society in the aspects of social, economic and leadership development to create an inclusive and harmonious state. As everyone is well aware, on 15 September 2020, the State Government of Penang carried out a minor reshuffle and my portfolio was upgraded to Executive Councillor for Social Development (MMK Pembangunan Sosial). Through this reshuffle, the State Government no longer looks only at the aspects of women and families, but will also focus on the needs of all marginalised groups of society such as children, the elderly and Persons with Disabilities. Good policy and investment in infrastructure are the key to creating a society that develops progressively and sustainably. Every individual in the community is able to play their own role in bringing about change. Therefore, the State Government of Penang takes a whole-of-society approach, or whole-society approach, by involving more non-governmental organisations (NGOs), private companies and government agencies in implementing and making any initiative successful. At this time, the State Government will prioritise Early Childhood Development and Active Ageing. Apart from organising programmes, we are also carrying out studies to help in the formulation of related policies, the provision of facilities and mechanisms that can help improve the quality of life of the groups of marginalised society.
Nevertheless, the efforts of MMK Pembangunan Sosial together with the Penang Women's Development Corporation (PWDC) in implementing the Gender Inclusivity Policy and programmes to empower women continue so that no one is left behind. In order to look more comprehensively at the focus on Early Childhood Development and Active Ageing, on 28 March this year, MMK Pembangunan Sosial carried out a consultative workshop with strategic partners involving NGOs, government agencies, private companies and educational institutions. Through the workshop, we were able to see the challenges that are often faced in the aspects of early childhood development and active ageing, and then several programmes, activities or suggestions for improvement were obtained from the workshop. Among the programmes being implemented are Preschooleducator.com and a charity fashion competition…(with permission), managed by elderly people from Rose Charities. Several other programmes resulting from the workshop are still at the planning stage and will be considered for implementation. Our strategic cooperation, which is the main pillar of MMK Pembangunan Sosial. This proves that cooperation with strategic partners and corporate entities is the way for us to move forward to meet a broader network in the community. Through this approach, we can provide quality programmes and ensure that grassroots groups also receive the benefits. One beneficial cooperation between the government and private sectors is Tadika@Techdome, an initiative together with the Whytehouse Education Group. Since this kindergarten opened in January 2020, a total of 76 children whose parents are government employees have benefited through this initiative. More than RM630,000 in education subsidies, including monthly fees and the cost of learning materials at an estimated RM1,700 per month, has been borne by Whytehouse to ease the financial burden of parents who obtain early childhood education services at Tadika@Techdome. This is good cooperation in efforts to reduce inequality in education. Padang Tembak Community Centre, another beneficial cooperation that has also been implemented, is the establishment of the Padang Tembak Community Centre involving the Padang Tembak Child Care Centre (PJKK Padang Tembak), a digital library and a multipurpose hall for sports activities. A three (3) year agreement was signed between three (3) parties, namely MBPP (Penang Island City Council), the Buddhist Tzu-Chi Merits Society Malaysia and PWDC representing the State Government of Penang. This centre will be managed by Tzu Chi and we hope that the facilities and activities provided at this centre will benefit the surrounding community, including youths, adults and children, especially from the B40 group. MMK Pembangunan Sosial is always open to working with and supporting beneficial programmes for society, especially marginalised groups. So, for any NGO that has good and beneficial programmes for the community, I welcome them to come forward to cooperate with my office. The State Government will continue initiatives to work with agencies and Federal Government departments and the private sector in improving the quality of care and early education for children affected by the COVID-19 pandemic. The role of teachers is very important in early childhood development because they are the ones who will build the foundation and holistic development for children for the next stage of education and life. The Whytehouse Education Group Sdn. Bhd. has developed an online learning and teaching platform, namely Preschooleducator.com. This platform aims to share knowledge on early childhood education through videos provided to improve skills and techniques for educating children. This learning portal is a useful guide for preschool teachers and also parents
who have children aged 6 years and below. MMK Pembangunan Sosial has once again collaborated with The Whytehouse to finance one year's membership fee for the platform for 1,000 preschool teachers and parents in Penang who are interested. I call on eligible groups to seize this opportunity to register while there are still vacancies. The website preschooleducator.com will be officially launched on 1 July 2022. The MMK office has also continued cooperation with The Whytehouse to publish the "Special Edition - Baby Sensory Book". The early years phase is important for children's development because early experiences will make a significant difference in determining how brain cells develop and in influencing their lifelong learning. The Baby Sensory Book will be printed in four (4) languages, namely English, Malay, Mandarin and Tamil, and contains a compilation of sensory play activities as a guide for parents and caregivers to help with the development and fine motor skills of babies. This book is expected to be ready by the end of June this year and will be distributed to new mothers who have given birth in hospitals, maternity care centres and child care centres around the State of Penang. So, for anyone, Honourable, who has a child under 12 months old, this is a book which I think will be useful for interacting with babies, yes. During the early stages of childhood, their learning and development in terms of mental, emotional and social aspects are extremely critical. That is why early childhood education is regarded as a very important investment by parents for their children. In Malaysia, early childhood education covers preschools, taska, tadika or tabika involving children aged under six years old and has been placed under different ministries. For the information of the august Members of this House, Singapore has an agency called the Early Childhood Development Agency (ECDA), and it has shown more systematic coordination in developing guidelines for programmes and curricula for preschool children aged 3 to 6 years. Therefore, I am of the view that the Federal Government should also coordinate the early childhood education system in Malaysia. I have previously proposed the establishment of a central-level agency for Early Childhood Development and Education, as a body to unify the entire early childhood care system and education structure that we have in Malaysia. This will ensure that every child gets access to comprehensive, quality and affordable early childhood care and education services. PWDC and Penang Institute carried out a survey from January until March this year to identify the needs of working parents who have children aged 0 to 7 years, with special focus on children who grew up in the endemic era. According to this study, 65% of parents still need childcare centre services and access assistance to learning and teaching materials so that they can educate their children more perfectly. Parents also took this opportunity to suggest that the State Government improve the quality of education and childcare in Penang. To increase women's participation in the employment sector, the State Government strongly encourages the establishment of new taskas in the State of Penang to facilitate especially mothers in obtaining childcare services. The State Government, through PWDC, has taken the initiative to set up another Taska D'Komtar to offer childcare services to the children of State and Federal Government employees at KOMTAR. The first Taska D'Komtar was established in 2014 and, for eight (8) years in operation, the demand for placements for children kept increasing until it reached maximum capacity. Accordingly, the establishment of another Taska D'Komtar is to
accommodate this increasing demand for childcare. This new Taska D'Komtar is expected to begin operating in 2023. The Active Aging Policies, apart from women and children, MMK Pembangunan Sosial has also focused on the elderly. Based on statistics…(interruption).
Honourable Padang Lalang, excuse me, please.
Okey.
Honourable Member, earlier during oral question time, you also stated that the State Government will provide, has already provided RM300,000.00 over the past three (3) years for repairs, for grants and so on for taska and tadika. Are these grants also applicable to government tadikas such as 'Tadika Perpaduan' and so on, or are they specifically for private tadikas or taska? I ask this, Honourable Member, because not only private taska that have no funds and are facing problems, but also Tadika Perpaduan that borrow buildings from MBSP, from KRT or MPKK are also facing problems. We can see this too needs to be helped. Will it also be included in that, and another thing is about Taska D'Komtar. One taska that I have seen is at MBSP when I was a Councillor, and it was very successful. And we can see it has indeed increased productivity, and parents do not need to worry too much about the safety of their children. If possible, all government departments should provide facilities like this, and the State or Federal Government should encourage private sector parties, especially MNCs that want to come and invest in Malaysia, to provide such places. It can be made one of the scopes. InvestPenang can tell them to provide them. If we look at Western countries, this practice already exists. Why not yet? So if we want to emulate Singapura, international practice and so on, we must also emulate them, and the private sector should also provide taska like these. That is my view, Honourable Member. Thank you.
Thank you to Honourable Bagan Dalam. Several issues, yes. Firstly, I agree that we want to encourage all agencies or government offices to establish, have or create childcare centres or taska. On this matter, since YB. Air Putih became Finance Minister, the Federal Government has allocated RM10.0 million, and this year it is RM30.0 million for government agencies to set up childcare centres. They must apply, of course. We have also applied to establish this second TASKA D'Komtar. We have applied, and I hope it will be approved. If it is not approved, we will still look for funds to set it up. That is the first point. The second point is that we indeed want to establish this and also encourage the private sector, especially those who are MNCs (Multi National Company). They are indeed interested in setting up childcare centres within their premises, but we have many local conditions. I think we must review them, yes, regarding how MBSP and MBPP can help us to enable these childcare centres to be established within industrial areas…(interruption).
Honourable Member, just one thing, briefly. I want to ask whether MBPP provides a taska like this, PDC, PBA? Because if funds have been provided since the Pakatan Harapan administration, why have we not implemented it in Penang, in our own agencies, MBPP, PDC, PBA and so on?
These agencies must take the initiative themselves to establish them, yes. But in KOMTAR, all the agencies inside KOMTAR can use this, Taska D'KOMTAR. But I also hope, I think PDC had one earlier. I do not know now whether it has reopened after COVID-19. So I agree that workplace childcare centres will increase productivity, so I hope all government agencies will take the initiative to establish taska within their respective workplaces, yes. The Social Development EXCO has focused on groups. We focus on the very young, yes, and also the elderly, because they need more care. Based on statistics from the Department of Statistics Malaysia, Penang State is now the second ageing society state in Malaysia after Perak. Perak is number one (1), Penang is number two (2). The same data shows that by 2040, the elderly population in Penang will increase to 26.2% and will take over from Perak as the First Ageing Society State in Malaysia within a period of 20 years. We always lead, lah. In 20 years' time, we will also lead in the ageing society, yes. I thank and agree with the proposal of ADUN Berapit and Bayan Lepas that the State Government needs to take seriously the issue of elderly care centres. Penang has private care services, and the State Government can look at how to cooperate in tackling this issue, especially for senior citizens who need medical treatment. This is a problem that is not so easy to address. But I think we need to start now on how to, how to face it, because one day we will all, all of us here, become old, yes.
Already old already.
Is a matter of time saja.
We are already old.
Ya, jadi kita active ageing means you must, you must stay active and stay healthy.
Clarification please, thank you Honourable Member.
Table to move around.
Thank you, Honourable Padang Lalang, for raising earlier a statistic. I also read about that study, which projects that after about 20 years, Penang State is expected to become number one. We will overtake Perak as a state with the highest ageing population…(with permission). But looking at those statistics, I think there is something we can do to address the ageing population situation, because I refer to an article that cited the statistic raised by Honourable Padang Lalang earlier. Actually, the issue refers to a situation where, if we cannot create employment opportunities that attract more people, especially young people, to remain in Penang State, then it will become a reality that we will try to increase the demographic, or the population of young people, to ensure that the ageing group is not too prominent. But I also agree with the view of Honourable Padang Lalang that we should look at perhaps establishing centres to care for those going into ageing, or senior citizens. Thank you.
Yes, thank you. I think this is, I hope all of us will cooperate, and because the State Government has never had an ageing policy and has never allocated funds to set up a senior care centre, this is a pre-precedent when we want to do something like this. We need research, and we need to examine our ability and finance ability. So I think it may take quite a long time to establish facilities like this, but we will make efforts. Research from the Centre for Health Technology and Services Research shows that active ageing can maintain the role of senior citizens in the family and society as individuals who are still able to be independent, healthy, active, productive and positive. What is more important is being healthy and productive. Indirectly, it will help the government reduce expenditure on treatment, because if one is unhealthy, one must go to hospital, and hospitals now are already very congested. Provision of facilities and social services such as provision of homes for the elderly, financial assistance and other appropriate needs. Therefore, the State Government, through PWDC in collaboration with Penang Institute, is drafting an active ageing policy in Penang State. This policy places emphasis on the importance of senior citizens continuing to engage in civic participation
and ensuring that they live their daily lives well, and emphasises cooperation between government and non-government parties on this issue. A Committee involving government and non-government parties will be established to implement the programmes under this policy, and it is expected to be tabled at the State Executive Council Meeting in the third quarter of this year. So perhaps now we cannot say we want to retire. Even if we retire, we must remain proactive, yes, so that we stay healthy, because if we are not healthy, the quality of life will not be very good. So we want to encourage, we will have programmes encouraging everyone, especially those who have retired, yes, to stay active, and also to educate their children not to tell their parents who have retired, "retire early, do not work anything anymore." We want to encourage them to keep working if possible. Work in a more relaxed way, not stopping altogether, all right. Like Mr Speaker. Like all of us now, we must go and exercise…(interruption).
Like Mr Speaker, ADUN, but cannot speak.
Everyone must stay active so that the body is healthy and the mind is alert. As an advocacy framework to raise public awareness, the concept of active ageing has been adopted as the theme of the Penang State Government Family Day Celebration campaign, which will be held from 6 to 27 August 2022. Various intergenerational programmes and activities will be carried out to create understanding that senior citizens can be active contributors to society and families. I hope all Honourable Members, together with the communities in their respective areas, can join this campaign together. I touch on postnatal confinement centres, yes. Although I have already mentioned this when answering the oral question for Sungai Pinang, I think this is an important trend, and we need to have centres, to license such centres, and we have succeeded in producing guidelines, and now all confinement centres can apply for a licence through MBPP and MBSP starting 1st July. So I want to take this opportunity to record my thanks to the Postnatal Confinement Centre Guidelines Committee chaired by ADUN Sungai Pinang, for their hard work and efforts in producing those guidelines, with the cooperation of the State Legal Office, PWDC and several other offices directly involved. So here, for example, I want to explain a little: we must not say that we have no law, or there are no conditions, or there are no guidelines, or because there is no source of authority, we cannot do it. Previously, in the last session, this House had a question, and none of the offices said that they could give evidence or an answer to this question, because the question involved confinement centres, as each one said this was not within their jurisdiction. No power, no power. So that is why we, myself and YB. Sungai Pinang, determined and resolved to provide this source of authority, so that the government gives the authority, and I want to thank my fellow EXCO members and also Y.A.B., because they also agreed that there must be a guideline to ensure the safety of postpartum mothers who choose to recover in this kind of centre. Because not all mothers have, mothers who can look after them. Previously there were, but now mothers live in the kampung, so there is a need for confinement centres. So I think…(interruption).
Clarification, Padang Lalang.
Ya.
Thank you, Padang Lalang, for the winding up on confinement centres. Indeed, confinement centres are a very high demand, and I only recently learned that we are introducing guidelines that will start on 1st July. I do not know the details, but I also have a question, because confinement centres across Malaysia or in Penang are located in business areas as well as residential areas, and for me, care centres, whether for mothers and babies, or the elderly, or children, must, in my view, have a plan that is acceptable within residential areas too, because it is a demand that cannot be separated from residents in certain areas. But we will also receive complaints from local people. So I ask for clarification from Padang Lalang: under the new guidelines, can we accept both centres, sorry, care centres, in both places? Thank you.
I do not yet know whether it can or not, because we will implement it and see what the response is, but I think this is probably in the guidelines.
If it is Padang Lalang's position, should this be carried out?
I think there is a process in setting up any care centre. There is a process for its neighbours to give their views. If the neighbours do not agree, then perhaps there may be obstacles, which is a problem. Yes, Sungai Pinang.
Clarification please. Yes, when we drafted those guidelines, we did consider it, because indeed if there is a need in the housing estate, then a type of building such as a bungalow or semi-detached house is permitted, but there are certain conditions, of course. So those conditions, I think the State Government EXCO will inform everyone afterwards. Thank you.
We will publicise these guidelines so that everyone understands them better. I would like to thank Tuan T.Y.T. who emphasised the importance of the Safe Family Policy in his speech. I also want to thank YB. ADUN Bayan Lepas, Pulau Betong and Sungai Pinang for supporting this policy. Yes, this policy is only found in Penang, and the establishment of the State Government of Penang's First Support Points is also growing. This is only in Penang. Earlier, Selangor's confinement centres already exist. Recently they have also approved conditions or guidelines on how to obtain a licence. Now, in addition to 43 First Support Points from NGOs and communities, government agencies are also showing their commitment on this issue. In 2022, a total of six (6) capacity-building training workshops were conducted for government agencies such as the Royal Malaysia Police, five (5) District and Land Offices, and the Penang Islamic Religious Affairs Department, to improve skills in handling domestic violence cases. The workplace is also seen as a place that can provide assistance to victims of domestic violence. For example, in Brazil, the company Magalu helped 700 of its employees who were victims of domestic violence by setting up a domestic violence emergency hotline. Therefore, in the future, the State Government will cooperate with private employers in establishing support and assistance for victims of domestic violence. From May 2021 until now, more than 20 awareness sessions have been carried out by PWDC, involving more than 1,000 participants from non-government parties, religious bodies, medical institutions, community groups and private educational institutions. I call on more parties, including Public Educational Institutions, to hold such sessions, in order to further raise public awareness about the campaign to stop domestic violence. For the information of all Honourable Members, the Friday sermon on 11 March 2022 also touched on the aspect of women, in which it raised awareness among Muslim men to maintain good relations in the family peacefully without using violence. The sermon was in conjunction with International Women's Day with the theme "Wahai Suami, Isterimu Tiket ke Syurga". "Wahai Suami, Isterimu Tiket ke Syurga". I think this is a good development for maintaining family and community well-being, and I hope more will be held in the future…(interruption).
Can I continue a little? Where is the wife's paradise?
A wife's paradise is also in her husband's hands, isn't it. This is compliments each other. I would like to record my thanks to the Penang Islamic Religious Affairs Department for its concern and willingness to carry the campaign to end domestic violence and to raise public awareness so that people will value and respect women more. As one of the initiatives to expand the support and assistance given to victims and the families of victims of domestic violence, a mobile application, Penang Stop Violence, was developed by PWDC and the Penang GIS Department. This application aims to help victims of domestic violence by showing the locations of parties who can help. This mobile application was awarded the Geospatial World Forum Excellence Awards 2022 in the Public Safety category
at the World Geospatial Forum in Amsterdam, the Netherlands, recently. This international recognition is a testimony of the State Government's concern in tackling the issue of domestic violence. So I hope this app is well maintained so that anyone who is looking for it and wants to download it can download it, yes. Honourable Members, the spread of the COVID-19 pandemic has seen many Non-Islamic Places of Worship (RIBI) that have resources also extending assistance to affected local communities. These RIBI also provided shelter during the flash floods that occurred in Pulau Pinang. This shows that the RIBI in Pulau Pinang are able to work together with the State Government in building the community. Even so, there are also RIBI that were affected by the spread of the COVID-19 pandemic. Following that, the State Government channelled a one-off Special Financial Aid of RM1,000 to RIBI in Pulau Pinang. A total of RM600 and RM1,000 was channelled to 600 and 1,000 RIBI in Pulau Pinang under the Pulau Pinang People's Aid Package 2.1, while RM324,000 was channelled to 324 RIBI in Pulau Pinang under the Pulau Pinang People's Aid Package 3.1. The Government did set aside funds for more than 1,000 RIBI but only 324 applied this time. Therefore, in line with the Penang2030 Vision, under Theme C "Memperkasakan Rakyat Bagi Meningkatkan Penyertaan Awam", the State Government intends to make RIBI strategic partners in social development and to recognise RIBI as Community Centres in Pulau Pinang as a State Government policy that encourages the organising of community programmes that benefit the local society. Article 3(1) of the Federal Constitution provides that Islam is the religion of the Federation, but other religions may be practised in peace and harmony in any part of the Federation. Therefore the State Government places great importance on the activities and management of the Non-Islamic Places of Worship in the State of Pulau Pinang. I support the issues and proposals raised by Honourable Air Itam. As a state with a multiracial and multireligious population, the RIBI issue must receive our attention and long-term solutions must be developed. I also take note that a motion was tabled at the full council meeting of the Penang Island City Council (MBPP) by Mr John Ooh as a councillor representing NGOs to draft Guidelines for the Whitening of RIBI Buildings to help and facilitate RIBI in obtaining the CCC Certificate of Completion and Compliance, or in English, "Certificate of Completion and Compliance." The State Government takes seriously the issues faced by RIBI. The State Executive Council (MMK) Committee on Non-Islamic Affairs has set up a Policy Coordination Committee on RIBI in both Local Authorities (PBT). This committee aims to look at the overall issues that arise, especially at PBT level, which are closely related to RIBI, and to recommend initiatives or proposed solutions to the MMK Committee on Non-Islamic Affairs. The committee at MBPP level is chaired by Honourable Sungai Pinang, while the committee at MBSP level is chaired by Honourable Bagan Dalam. The State Government, through the MMK Committee on Non-Islamic Affairs, has also taken proactive steps by developing the Pulau Pinang State Government eRIBI System, which is to be launched in the near future. The eRIBI System is a system that collects data and information on RIBI in Pulau Pinang comprehensively, completely and centrally. With accurate information, guidelines and policies can be drafted that are suitable for us to address RIBI issues and matters concerning harmony and unity among the various religions. Malaysia has a population composed of diverse cultures and races. Harmonious relations among the races will further strengthen the sovereignty and development of the nation. The harmony that arises from unity among the people is a distinctive feature and also an attraction for
foreign investors to invest. Various initiatives and programmes have been organised by the Penang Harmoni Corporation or HARMONICO to foster an inclusive and harmonious society. Recently, the Pulau Pinang Harmony Week or Penang Harmony Week was launched with a series of programmes that showcase the harmony of Pulau Pinang as a plural state rich in diverse cultures. Religious festival celebrations were also organised together with various religious organisations and were attended by the public. In addition, HARMONICO has also launched a religious exploration campaign as an effort to broaden understanding and knowledge of the different places of worship in Pulau Pinang, and to change the perspective of people who have doubts about visiting places of worship of religions other than their own. This effort is in line with the Penang Tourism Master Plan, as it can offer an alternative domestic and international tourism product by attracting the interest of local residents from outside the country and also foreign tourists who are drawn to the uniqueness of RIBI in Pulau Pinang. All these initiatives are steps and efforts of the State Government to foster understanding among the various races and religions because we believe this understanding is the foundation of respect and harmony among one another. Therefore, efforts to achieve harmony and inclusiveness in Pulau Pinang are joint efforts; the role of the State Assemblymen and the community as strategic partners is important in achieving the agenda of unity in diversity, unity in diversity. The spread of the COVID-19 pandemic has affected the lives of everyone, especially children and women in low-income families. Therefore, in order to assess the impact of the COVID-19 pandemic on women and children, especially those from low-income households, the Pulau Pinang State Government and the United Nations Children's Fund (UNICEF) are conducting a study on this issue. This study is being carried out by the Penang Institute beginning in January and is expected to be completed at the end of this year, by identifying the challenges faced by these groups and the effectiveness of the State Government in addressing this situation. This research study is expected to show new perspectives and policy proposals to improve the efficiency of the State Government in social welfare in Pulau Pinang. Studies like this are important in giving understanding to the state, to the State Government, about the challenges faced by families, especially after the COVID-19 pandemic. A harmonious family environment is very important in the development and upbringing of children, especially those aged under 7 years. According to a study from Australia in 2021, close and healthy family relationships can increase children's resilience and they can be prepared to face life's challenges. This is very important especially when we are in an era of pandemic that is full of life constraints. Throughout the month of May, eight (8) people jumped with the intention of committing suicide at the Penang Bridge. I am very saddened by this news and would like to thank the ADUN Batu Uban and KOMTAR for raising an issue that is very hot at this time. Therefore I would like to stress once again the importance of a harmonious family environment in building children's resilience so that they can overcome life's pressures in the future and do not take the easy way out, is not an easy way, actually it is a very difficult way, but they do not know when they face life's constraints. This can be seen through a study in Asia-Pacific Psychiatry in 2021 which found that the family environment and communication are very important in identifying the support that needs to be given to family members to prevent cases of suicide. Parents need to pay more attention to the emotions of their children.
Therefore, in line with the Pulau Pinang Vision 2030, the State Government will continue efforts to carry out programmes that can strengthen the family institution. Malaysia is ranked 104th in the World Economic Forum Global Gender Gap Index 2020 and is in ninth place in Southeast Asia. Although Malaysia has achieved gender parity in some factors, our country is still far behind when viewed in terms of economic and political literacy. Therefore, the State Government, in cooperation with Universiti Sains Malaysia, will carry out this study to present a more in-depth scenario that reflects the division of housework according to gender perspectives in the context of the new normal. This social development becomes the basis so that all modernisation processes do not have side effects on the well-being of society, which aims at the welfare of the people. However, social development is not solely the responsibility of the State Government, as it is the responsibility of all segments of society as well as private agencies and NGOs. Therefore I call on all Honourable Members to work together with the State Government in pooling energy to achieve the welfare of the people. That is what we need, the whole society approach. Everyone has a responsibility. Finally, I record my thanks for the views and proposals that have been expressed by Honourable Members regarding my portfolio, and I also want to thank my team who prepared this speech. So I beg to support. Thank you.
Thank you, Padang Lalang. Honourable Perai, you are invited to speak.
Thank you, Deputy Speaker, thank you for giving me the opportunity to deliver the winding-up of the debate in this House. Generally, what is often said or frequently said is the issue of unemployment in Pulau Pinang, and now this issue is not unemployment. The issue is the lack of workers for industries. So if we compare with 2021, we had this unemployment even during the pandemic era, 30.6%, which dropped to 30.3% in 2022. This may be early 2022 and I feel it may be even lower, because we feel the issue is the lack of jobs, more so that we do not have skilled workers, talented workers and so on. Another issue, with the background of the minimum wage that is often referred to, that is spoken about and also debated, is RM1,500, which was introduced on 1 May 2022. So I am in a dilemma. This minimum wage is one that I feel is not enough, even though it is the official minimum wage issued by the Federal Government. But this minimum wage, in my view, is not meaningful because I feel that, considering the issue of rising prices, inflation and so on, this is not meaningful, even though there are also those who say that because of the minimum wage, the prices of all goods rise. But what is needed is not the minimum wage but a wage that is sufficient and in line with the economic rate, especially for the working class and so on. So I now go to Honourable Sungai Dua who asked a question about the annual allocation to religious schools, Chinese schools, Tamil schools and so on, and especially regarding this allocation, which we actually used, I think this allocation began in 2009 if I am not mistaken, and this will continue for as long as the Pakatan Harapan Government is in Pulau Pinang, and its allocation is so that we can go to physical facilities and development in schools. When we focus on religious schools, what are the criteria that Sungai Dua asked about? For the allocation, they must, these schools must be compulsorily registered with MAINPP. Then the number of teachers, how many teachers, and also the number of students? These are roughly three (3) criteria used to determine the allocation to religious schools, which I feel is no different from other schools. So this is a programme that we continue under the Pakatan Harapan Government and I feel this has given a good benefit, a very great advantage to schools like the Chinese schools. These are the schools that we say are capital-grant schools. Capital aid, and I feel this is a contribution made by the State Government to meet the needs of these schools, because these capital-grant schools, most of them are big Chinese schools and Tamil schools that are capital-grant schools, and I feel the Federal Government only provides teachers' salaries. Honourable Air Itam may perhaps be regretful when it was mentioned about the lost generation or The Last of The Mohicans, when COVID in these two years, when many of these students may have dropped out, and what steps were taken by the Pulau Pinang Government, especially the Penang State Education Department? I think there is a lot of this, what information we received, although I feel that when the government changed in 2020, the relationship between the State Government and the Education Department is not something that is not, not anything, it is not that there is no relationship at all, but even so we did receive information and so on. So, how does JPN monitor and take action so that this dropout can be contained and so on, there is counselling, training for teachers, monitoring, class guidance, remedial classes, screening of pupils, setting up working committees, what, special plans have been arranged to contain or address the dropout problem. But yes, whether this is a lost generation, I am not sure. But this is what Honourable Air Itam just used. Honourable Bagan Dalam raised the issue of why this JPNPP, the Penang State Education Department, did not allow them to enter schools, school premises? And I feel this is something we experienced not only now but also before, when the government, this government, the State Government was an opposition government at the Federal level. And so we experienced this problem before now. So, what is this issue? According to JPNPP, before a dignitary enters the area or school campus, they must obtain permission from the Director-General of Education Malaysia. So, this is a formal response when we asked JPNPP. But this is indeed something that I feel is problematic, because I feel does this mean we cannot meet the PIBG, perhaps this is where we cannot meet the LPS and so on. But I do not know whether there is a directive from the Federal Government, especially the Ministry of Education, that they should not, should not receive, receive parties, meaning from the State Government, to visit schools and so on. So, this is a problem, a big problem where, how will we carry out programmes, for example before, when Pakatan Harapan was the Federal Government at that time, we carried out many programmes with schools. We did things like Maker Lab and so on, where more than RM3 million was allocated for national schools and so on. This was welcomed by the Penang State Education Department. But I feel this changed after the Pakatan Harapan Government fell in Putrajaya.
So, we go back to the role that was previously there so that we, but, however I feel we take this example, the STEM Council programme. The STEM Council has several clusters. I feel they have no problem contacting the Penang State Education Department to carry out programmes. So, when, so we give them room. I am not interfering in this matter here, but we allow programmes like the STEM Council, like the Science Cluster, like Tech Dome and so on. When they contact, they do not have problems. So for example, in the Penang Science Cluster, they carry out many programmes with national schools through JPNPP. So, we encourage it. We encourage it, although I feel it is difficult for someone like me or Honourable Bagan Dalam or even the Chief Minister himself, we cannot. So they feel that, no, they are not, they are not hostile to us. It is just that they feel perhaps there are directives and so on. Perhaps they are shy and so on. We understand. Yes, please.
Perai.
Ya.
I thank you for the STEM activities, the Penang Science Cluster and so on, which involve schools, perhaps National Schools. But I want certainty. I want one set of data, a list of the schools involved in STEM and also any education programmes under the State Government. Because I did request it in a question, a written question. But the answer was not very complete. If possible, provide the list of schools, which may also involve schools in my area. I don't know. And thank you if there are, thank you very much.
Second, regarding the issue of not being able to enter schools. I raised it in the debate the other day. And I have said it before, I don't know whether today it is the political scenario or the political situation and so on. What also happened in my time happened in the PH time too. I cannot enter schools, same lah. The same situation happened, I also find it strange. I also feel it's strange, I could not go and see the UPSR results. I could not enter when schools are opened. I could not go and officiate the PIBG. I could not do the same. That situation happened just like that. So we still have not changed in that respect. I thought I could enter schools in my area lah. And it happened, YB. Perai. So we cannot blame anyone. Maybe these political people don't know lah. If I were Minister of Education, I would allow it. (The House thumps the table.) I have no problem. Because we want to…(interruption).
Parliamentary candidate for Tasek Gelugor.
We must give room to one another. It is not politics at all. And regarding the issue of allocation just now, there was a question I raised, if possible.
What answer is this, Leader of the Opposition. I need to say, I think if at the JPN there are individuals like the Leader of the Opposition, we welcome that. A person who is open in ideas, the issue, don't, don't, what is this, politicising education and so on. But the reality is different. This is what we experienced when Pakatan Rakyat at that time took over the Penang State Government in 2008, and we continued to experience this problem. We did not go into the schools. But we could interact with the PIBG, not in, not in the school, outside the school. Outside the school, so we felt that however, we must channel assistance to schools starting from 2009. And recently, just finish this. Recently, I think this is not at the level of the JPN or what instructions were given to the schools. But we have a problem, when we ask schools to do a programme, we can understand. We do not want to make things difficult for the Headmasters at the schools. They refuse, they do not want to, because there was an incident where a Headmaster was transferred. Transferred to a Science School as a, an action, an action because at that time it was the former CM, Saudara Lim Guan Eng, and I went to the school, and that was the punishment for the Headmaster. So, why did this happen. I guess what their instructions were. So, this issue may be that the JPN Director must follow that instruction. So, I, I don't know. But however, I think that even though we may not be able to give other assistance, when Pakatan Harapan was in government we did provide programmes for Science such as Maker Lab, we allocated more than RM3 million and so on. The cooperation at that time was very good, very close. But now there isn't any. But what we do indirectly is ask government agencies, because whatever happens we cannot forget students at National Schools. Right? So, we ask them to run programmes, run activities with National Schools, and I think they have no problem obtaining permission from the State Education Department. Yes, Satees.
Air Itam. Air Itam first. About the JPN. Wanted to ask just now. I'll continue. Air Itam one.
Dato' Speaker, the Honourable Member for Perai, what we want to raise now is not in terms of programmes. In terms of contributions, we want to give to help the school so that the children can be in a better environment for learning, that is also not allowed.
In fact recently, there was an instruction that went viral on WhatsApp, that whenever any YB. Parliament or YB. ADUN wants to enter a school to make a contribution, they must write to the Director of the Penang State Education Department (JPNPP) to obtain approval to hand it over to the PIBG as well. So, is this really happening in the current situation? Previously we went straight to the PIBG, we could enter. Now we must enter through the JPN Director, only then can we enter. So, this is unfair to the schoolchildren who need those necessities, for example chairs, tables and so on. If the JPN or the Ministry of Education can supply them, there is no need for the ADUN to enter. Right? Thank you.
Honourable Member for Perai, I continue. This is something we have also discussed with the ADUNs. The latest instruction is that any assistance from YB. Parliament or ADUN must obtain approval from the Director, the Director-General of State Education. For me, this doesn't make sense. Why does the State Education Director want to come and control this matter. Actually, especially for the aided schools, Sekolah Agama Rakyat, Chinese national-type schools and Tamil national-type schools. Because, the name itself is aided school, the government only provides capital, namely teachers' salaries and so on. The amount is very small, but land, other infrastructure, tables and chairs are all sourced by the School Management Board and the PIBG themselves. Now they are being blocked. They say the PIBG can no longer accept it. So, this will create a difficulty for the school parties, especially schools in the interior too, capital assistance. I want to ask here, what is the Education Department afraid of. Is it that they do not want Representatives to know the actual situation inside the school? Because, I have once entered a school and seen the wiring system which is old, could catch fire, there is a risk of fire. Perhaps is it that the Education Department does not want local representatives to know about this matter? Only when there is a fire will we know. This, this is the actual situation. And is it the same as Air Itam, we want to ask, if the JPN can channel assistance to these schools, then we don't need to go and help. They also come to us, the ADUNs or the State Government, because they do not get assistance. To make their school sports successful they also need help from the ADUNs. If the JPN Penang says, approval must be obtained from us first. If we do not approve, it cannot be accepted. Will JPN Penang provide the assistance that is being requested? This is my second question. And was Perai previously, at least before this, able to accept even if we did not give, we entered the school. They came to our office, received assistance or the gate. We gave assistance at the gate. Now they say, cannot take anything at all from the ADUN or Member of Parliament. So, does Perai agree if I say, this matter is something very, very unreasonable and does not make sense. This is my question, thank you.
Thank you. I think both questions just now from Air Itam and, what is it, Bagan Dalam, are more or less the same. And I agree that there is no reasonable reason to create these obstacles, because we, the State Government, want to help National Schools, Chinese schools, Religious Rakyat schools or Tamil schools. We help them, but because they are not, we are not allowed to make this contribution, we must go through perhaps other agencies under the State Government so that they have a relationship with the Education Department and so on. I'll give one case, just finish this one. There was a recent case of a school, a SMK in Bagan, yes, SK Assumption, which may be closed. Closed, perhaps I asked what this is, the State Education Department, and I sent a letter to them, saying why they want to close the school and so on. The answer was, YB. contact the centre directly, don't contact through, if we receive a letter, we will send it. So, the JPN wants to be like a post office. So, I also don't understand. I feel, what is this, it's sad that this school has been closed, closed, and these students are dispersed to several schools. So, this issue, yes, what is this, Pulau Tikus, yes.
Honourable Member for Perai, just want to ask and add also and also to appeal to friends from the Opposition who are in the leadership of the party now, who are in the leadership at the Federal level now, because we have entered a phase in our history where our children, grandchildren, great-grandchildren, most parents now have lost confidence. Why? Because education is easily politicised by those at the Federal leadership level, and I think we have reached a stage where this culture should be changed, because since we have reached a stage where if this continues it will bring more, will give many more problems to society in the future. Because if every politician who becomes Minister of Education tries to bring policies based on their own principles, for their own political interest. And in the future what will happen to our country? Even now you can see many parents are sending their children to international schools. Therefore, I just want to ask about the issue raised by the Honourable Air Itam just now, is that really the instruction in Penang or is it just a rumour only or just a viral message? Because what I know just now, my office has checked and the JPN said there is no such instruction. So I want to ask if the Honourable Member for Perai can also get clarification on who is right and who is wrong, because now there is a lot of confusion, some say it is true, some say it is not true?
Terima kasih.
Until today I also don't know whether there is a written black-and-white instruction from the Ministry of Education to the State Education Department in Penang or anywhere else. Was there an instruction, but I think even though I have not seen their instruction, perhaps there may be one, perhaps not in writing, perhaps there is also a verbal instruction and so on, for them not to cooperate with this, with the State Government or with this, with the Representatives, whether they are ADUNs or Member Parliament.
So this is an issue and this issue is not something new. This has come up since 2008, when we had schools at that time. As I gave an example just now, when I and the former Chief Minister went to the school, the Headmaster was transferred immediately. Yes, immediately. So, perhaps there is something that we may not yet know. So, however, I want to stress here that even though there are these constraints, there is no relationship, the relationship between the State Government and the Education Office, the Education Department, but many programmes are carried out through the agencies that we place under STEM. So, there is also another question from Bagan Dalam, the leak of SPM candidate data, JPN. But I don't have any answer. They said it's not them. That's the question from Bagan Dalam, right? The leak?
Honourable Member, I'll state how, because private colleges out there can get data of SPM school leavers before the results come out. I have stated this comes out of the school. Leaked from the school, but there must be action. Previously I also brought it up in the newspapers, but there was no action, and we see private colleges, before they get the SPM results, offering courses that are not relevant. Low quality courses to these students. So where did this breach of data happen. This is what I asked, YB. Prof.
(Audio system not turned on) Sorry, how do the private colleges know these candidates may fail or pass? But where do they get this from? So this is something I think continues, but what we can tell is that the JPN, they are the source of the leak of names. So…(interruption).
Just want to add something. First, actually I do not blame the JPN. I say there are individuals inside the school, if not school teachers, who else? First thing that. Going back to the issue of entering the school. We discussed here, there are friends who sent it in. It seems only Representatives from the State Government are being blocked from entering schools. On 17 April the Leader of the Opposition posted on Facebook. Not only the Leader of the Opposition with the Ketua Dato', Honourable Datuk, UMNO Tasek Gelugor Division Chief, and the UMNO Tasek Gelugor Division Secretary entered. This is the party. We are ADUNs of the constituency. We do not carry party banners. We do not carry party identity. I don't need to go in, that's fine. At least let us give assistance. Even this they want to block. So we want to ask back to the Minister of Education…(interruption).
Dato' Leader of the Opposition is a former student of that school.
Ha, okay? Like this lah. Is that the one that went viral? Facebook?
Ya, Facebook.
On Facebook? The 17th of April, just recently? Perhaps the report wrote the divisional post. But that's it. In this situation too I will tell the story again. We cannot blame the JPN or the Headmaster. Sometimes, when the government that rules the Federation, because I also experienced what you all feel, cannot enter the school, cannot give assistance. But I am thankful I could not give assistance because at that time there was no allocation…(interruption).
Not the Ministry of Education, can we blame UMNO?
I don't know, can we blame UMNO for the political situation that was introduced that became like that. They are afraid. This is what we don't really like, because when politics is like this…(interruption).
Leader of the Opposition, there must be a party responsible for this. Who issued the instruction?
Ha, that's what I don't know either. Perhaps whoever issued the instruction. Sometimes it's not an instruction...(interruption).
Does the Leader of the Opposition agree if ADUNs are allowed to enter the school?
The understanding of the school parties and so on, when a government like this, will follow like this. Sometimes it becomes like that. I'm afraid of that kind of thing. The instruction may not be in writing at all. Who wants to issue a written instruction. Parties, schools cannot enter. No instruction....(interruption).
We will come back to this issue, I think this cannot be resolved today.
Leader of the Opposition, actions speak louder than words. Okay? Enough.
I also got it. If I got it, never mind. I'm the same too.
Thank you. When is this? Just say it, when did it happen?
When I was in PH, I also got it. That's all.
If so, now an injustice is happening to us. Let's not do it to others. The same. Now, if you ask me, UMNO or whatever. ADUNs as Representatives should be allowed to enter. Why can the UMNO Secretary enter but not the Representatives?
Let this be settled…(interruption).
This really happens. As ADUN for Sungai Bakap, if I want to give school assistance, I call the Headmaster to come to my office. If they want a transfer, within 24 hours I will go to the school.
May I continue. I now turn to the question raised by the Honourable Member for Seberang Jaya regarding the education hub in the South West district, namely the 1.322 acres owned by CMI. This was set aside for an education zone. So what happened? I think that on 2 December 2019, the State Government signed an MOU with Asian Women Leadership University (AWLU) so that they would build a campus on this site. Because of delays in obtaining this licence, a legal case was brought by certain parties asking why this process was slow, and they also took it to court. This case is somewhat complicated. So what we received from AWLU is that they are not applying for a new licence but for a renewal. They are buying back the licence from another party so that they can apply for a licence from the Ministry of Education. So once AWLU obtains the licence, I think this college can start in Penang. The issue of shortage of workers. Many issues on the shortage of workers were raised during the debate. This is not something specific, and from the State Government's view this is indeed a national issue. And from the perspective of the State Government,
we in Penang view this issue as one of talent or skilled workers that we need to produce. So, because the issue of talent is extremely important today, I myself have held a discussion through a webinar, through the Penang Institute and so on, so that we can produce a report on how the Federal Government can help Penang, so that we can obtain workers or remove any obstacles and so on. So this report that I mentioned during the question and answer session will be sent to the Chief Minister, and then the Chief Minister will send it to the Federal Government or any relevant department. YB. Berapit also raised the issue of testimonials or certificates that we give to the children who take part in TVET programmes, and I strongly agree with this proposal. I think it is something we should also consider together with the STEM Council, so that when we give certificates to them, it will encourage their parents to support TVET programmes and so on. The issue raised by Berapit concerns PDL, and perhaps this morning I gave an answer to the question asked by the Honourable Member for Pasir Putih and Air Putih, regarding the operation of PDL in Penang. The issue is that at present it operates from 9.00 am to 6.00 pm. This is a consequence of COVID. The COVID pandemic forced us to limit the hours of the Penang Digital Library. So there is a request that this be extended to 20 hours or 24 hours. So I have discussed with CMI, which in fact owns the Penang Digital Library, whether we can relax the hours for the Penang Digital Library. We have it in Penang, we have it in Seberang Perai, we have it in the South West and so on. So I think there is no obstacle, but what determines it is whether we have staff, whether we have a budget and so on. So the question is whether we are willing to, for example, extend it from 9.00 am to 10.00 pm, and then we will gradually increase its hours phase by phase. So I think that is not a major issue for the Penang Digital Library. But the issue of digital libraries has meaning in libraries, libraries in Penang. The State Government's libraries do have a digital section, so this does not mean that we must set up a digital library, but there are also libraries that have digital components and so on. So I think perhaps I will bring this issue to CMI and also to the SUK division so that we can see how we can extend the hours for PDL. I do not, in principle, have any objection.
ADUN Perai.
Ya.
May I ask a question regarding the labour force?
Ya, boleh.
Thank you. Because earlier I missed what Perai said about the labour force in the State of Negeri Pulau Pinang. Yes, it is indeed a national issue, but according to what I see in the second written answer relating to the shortage of labour in Negeri Pulau Pinang, there is a shortage of 33,609 persons across all economic sectors in Negeri Pulau Pinang. On this shortage of labour, I have also seen, and I have asked a question about this, that according to our answer, the number of Rohingya refugees in Negeri Pulau Pinang is over 20,000. Can we take these refugees to fill the vacancies in the relevant sectors, so that we can reduce the gap, where many economic sectors have been forced to be unable to increase productivity, including the agriculture sector, which requires a large number of workers. Can the State Government coordinate so that these Rohingya refugees can give, contribute their labour to the economic sectors in our country. I ask for an explanation from Perai.
I think that is a view that I can accept, because the Minister of Plantation and Commodities, Zuraida Kamaruddin, also raised this issue, I am not sure, perhaps one (1) or two (2) months ago. So, we can also use prisoners from prisons because of the shortage of labour. So, when she also mentioned that when we use prisoners from prison as workers, do not consider this as forced labour. Then I also do not know what happened, but there was a request from the Machang Bubuk area. Okay, not only Rohingya, any foreign workers without documentation can be used because we have a very serious shortage of workers in this country. But the State Government can propose. We can propose to the Ministry, but this is a position that must be taken by the Federal Cabinet. That is not a task or something the State Government can take. But I think I am open to this matter, why not? Can we. But, can the Federal Government consider the issue of taking in Rohingya, like other workers without documentation. This is indeed possible. What is wrong, but whether they have a position to do so. That is something I need to know. I do not think this is a State Government matter, it is a Federal matter. Okay, I will continue. The Honourable Member for Sungai Pinang also raised, and the Honourable Member for Pengkalan Kota raised the issue of job opportunities for local youth, and I think this is indeed an objective taken by the State Government so that we use, reduce foreign workers by encouraging local people and so on. So, one of the measures is job matching, where all this has been done during the pandemic, not only by the State Government through InvestPenang but also by the Social Security Organisation (PERKESO). This is also done by several voluntary bodies and so on, job matching. So, here we give opportunities to local people, young people and so on. Whether this has been successful or not, I am not very sure, but because we currently have a shortage of workers, and perhaps I have also heard from factories, they have also changed their way of recruitment through what is called a more flexible approach, to encourage local workers so that their work is not the usual eight to five, but a more flexible system for them. So, these are the core issues that were raised regarding my portfolio during the debate, and there are also many broader issues on workers, unemployment, the issue of worker talent and so on, but I have tried to give answers to these
and I think if I have missed any questions asked by the Members of this House, perhaps they can raise them now, and if not, I will immediately support.
Thank you, Perai. Pinang Tunggal, you have the floor.
Assalamualaikum Warahmatullahi Wabarakatuh, Salam Sejahtera. Deputy Speaker of the Penang State Legislative Assembly. (Recitation of prayer). The Most Honourable Member. Mr Chow Kon Yeow, Chief Minister of Penang, Honourable Members. Alhamdulillah. Thanks be to Allah SWT that we are able to attend the First Meeting of the Fifth Session of the Fourteenth Penang State Legislative Assembly. First of all, allow me to record my appreciation and thanks for the opportunity given to me to wind up the debate and deliver the winding-up speech on issues relating to my portfolio that have been debated by the Honourable Members. I also wish to thank all the Honourable Members who took part in the debate and gave suggestions so that together we can improve the State Government's planning in providing the best services to the people of the State of Penang. As Chairman of the State Executive Council (MMK) Committee on Islamic Affairs, I would like to take this opportunity to thank all the parties involved for the support given to the State Government in its efforts to uphold Islam as the official religion of Penang in line with Article 5(1) of the Penang State Constitution. My highest appreciation to the State Government for the commitment shown in strengthening the Islamic way of life (Syiar Islam) in this state. The allocation of RM71.13 million for the year 2022 is an increase of RM6.97 million compared with the year 2021. This is certainly very significant in addressing the welfare of all Muslims in this state. Every year, various official events at the State of Penang level are organised by the Penang Islamic Religious Affairs Department (JHEAIPP), such as the Al-Quran Recitation and Memorisation Competition (Majlis Tilawah dan Hafazan Al-Quran), the Maal Hijrah Celebration, the Maulidur Rasul and the Nasyid Festival, with the allocation disbursed by the State Government this year amounting to RM718,250.00. The organisation of these events is very important in commemorating important events in the Islamic Calendar, as well as in selecting candidates or representatives who will represent the State of Penang at the national level. I am also pleased to announce that in the coming year, 2023, InsyaAllah, the State Government has agreed for Penang to host the national-level Al-Quran Recitation (Tilawah Al-Quran). The implementation of programmes under the MMK for Religious Affairs is also channelled by the State Government every year, amounting to, this year, RM762,550.00. This allocation is to ensure that all religious departments and agencies in the State of Penang can organise beneficial programmes for Muslims. We are always committed to the implementation of the Khaira Ummah 2030 Agenda as I have presented before, underpinned by the effort of "Preparing the Best Muslim Community for Penang by 2030". This great endeavour to prepare the ummah, or a generation of human beings, is certainly not an easy task. It is not an overnight job, but we have to start somewhere, somehow.
In efforts to prepare Muslims to face the challenges of life in the years to come, the Khaira Ummah 2030 Agenda places main focus on the development of knowledge/intellectualism and the strengthening of the mosque institution so that it functions to the maximum. To realise this noble intention, all eight (8) Islamic agencies under the MMK for Religious Affairs, namely MAINPP, Zakat Penang, KITAB, Wakaf Penang, JHEAIPP, the Syariah Judiciary Department and the Syariah Prosecution Department, as well as the Penang Islamic Foundation (Yayasan Islam Pulau Pinang), must also be strengthened and play their respective roles. The Honourable Member for Sungai Dua asked about the source of funds used by KITAB for overseas visits. For information, KITAB is a fully owned Institution of Higher Learning of the Penang Islamic Religious Council (MAINPP). The registration of KITAB as an Institution of Higher Learning falls under the Private Higher Educational Institutions Act (Akta 555), not book 555, under the supervision of the Ministry of Higher Education Malaysia (KPT). All management and operational costs of KITAB come from the allocation of the Penang Islamic Religious Council. Therefore, overseas visits to forge strategic academic cooperation also come from the annual allocation provided by the Penang Islamic Religious Council. As a Private Higher Education Institution, KITAB must fulfil the criteria set out in MyQUEST (Malaysian Quality Evaluation System for Private Colleges) under the supervision of the Ministry of Higher Education Malaysia (KPT). One branch of criteria required by MyQUEST is internationalisation. In this regard, in order to fulfil the blueprint of the KITAB 2030 strategic plan, namely to upgrade KITAB to a University College and subsequently into a University, cooperation with institutions of higher learning at the international level is highly appropriate. KITAB has taken steps by establishing cooperation with two (2) world-renowned universities, namely Al-Azhar University in Egypt and the World Islamic Sciences Education (WISE) in Amman, Jordan, to recognise KITAB diploma graduates to pursue Bachelor's degree studies through credit transfer. At the same time, it was involved with the State Government delegation to Penang Week and the Dubai Expo 2020 to promote KITAB in the Middle East for the purpose of cooperation with several universities there. In order to realise a landmark of Islamic education in this state, the State Government of Penang together with KITAB has established the Penang Islamic Digital Library (PIDL) – Perpustakaan Digital Islam Pulau Pinang and also the Al-Hady Centre – Pusat Kajian Pemikiran dan Ketamadunan Islam Negeri Pulau Pinang. The establishment of PIDL under the management of KITAB will be the best platform for disseminating knowledge and information in various fields, especially Islamic Sciences, to the whole community in digital form. In addition, PIDL will certainly be the best channel in empowering the State Government's aspiration to increase accessibility and equity towards creating a 'smart community' and developing a knowledgeable society. The launch of PIDL is very timely in the State Government's efforts to produce human capital that is knowledgeable, skilled, of integrity, highly ethical, of quality and competitive, able to become a catalyst for the state's development in achieving the goal of Penang as a Smart State by 2030. Besides that, KITAB has also been entrusted to lead the establishment of the Al-Hady Centre by the State Government of Penang. The Al-Hady Centre is a Penang State Centre for the Study of Islamic Thought and Civilisation that integrates thought and civilisation for research purposes in the fields of politics, economics, social affairs and science & technology from an Islamic perspective. This Study Centre was named the Al-Hady Centre by the State Government of Penang after a leading figure of educational reform in the State of Penang in the past, namely Syed Syeikh AlHady. The launch of the establishment of the Al-Hady Centre is in line with the Vision and Mission of the Khaira Ummah 2030 Concept, namely "Preparing and Empowering the Best Muslim Community for Penang" through the Knowledge Development programme. PIDL and the Al-Hady Centre are now a new landmark of the State of Penang and are positioned at the only Islamic IPT in Penang fully owned by the Penang Islamic Religious Council. This landmark symbolises intellectualism towards an Islamic IPT that is the most outstanding in Penang. KITAB, which was formerly started as a Maahad Tahfiz, continues the effort and extends the historical lineage of Islamic Education that has long been established in this state. PIDL and the Al-Hady Centre are also a symbol of the togetherness of the State Government and the Penang Islamic Religious Council through KITAB towards the effort of producing a knowledgeable society, in line with the efforts of the State Government of Penang, namely the Khaira Ummah 2030 Concept.
Honourable Dato' Deputy Speaker, the Honourable Member for Sungai Dua also informed that KITAB needs to look for other sources of funds and not depend solely on financial sources from zakat. For the information of the Honourable Member, the zakat ecosystem is related to collection and distribution. Collection from those who have wealth, and distribution to those in need from the eight (8) asnaf that have been outlined in Islam. One of the categories of asnaf is fisabilillah. KITAB is an Islamic Institution of Higher Learning established by the Penang Islamic Religious Council in 2004, which is a continuation of a Penang State Al-Quran Tahfiz Ma'ahad operated by MAINPP since 1995. Therefore, it is the responsibility of MAINPP to provide the annual budget allocation to KITAB through the distribution of zakat allocation in line with the development and growth of KITAB from time to time. KITAB is an Islamic Higher Education Institution that falls under the category of asnaf fisabilillah. The views of contemporary Islamic scholars such as Sheikh Dr. Yusof al-Qardawi, al-Imam al-Kasani and Sheikh Mahmud Syalthut, who stated that the operation of zakat funds in the asnaf fisabilillah in this era encompasses a broader meaning, including the construction of school buildings, Islamic centres, mosques, da'wah organisations and many others. They also interpret fisabilillah as everything related to the general welfare of Muslims. Therefore, after more than 25 years of operation, today the people of Penang in particular can see the prominence of KITAB through the systematic role of the zakat ecosystem. Apart from zakat sources, KITAB has also explored waqf. To ensure the sustainability of KITAB in the long term, KITAB has established cooperation in terms of waqf fund collection with Wakaf Penang (WPP), named Wakaf Pengajian Tinggi KITAB. The launch of Wakaf Pengajian Tinggi KITAB (WPTK) was officiated by Tuan Yang Terutama Tun Dato' Seri Utama Ahmad Fuzi bin Haji Abdul Razak, Yang di-Pertua Negeri Pulau Pinang, on 26 October 2021 that has just passed. At the same time, the State Government also assisted KITAB's development budget by financing the cost of rewiring the electrical system in the existing complex and also replacing the new roof of the KITAB Academic Building implemented in 2020 and 2021.
In reply to the Honourable Member for Telok Bahang, a meeting was held on 15 April, this is on the current status of Masjid Air Putih. A meeting was held on 15 April 2022 chaired by the South West District Officer with the attendance of representatives from the Town and Country Planning Department, Penang Island City Council (MBPP), Affin Bank, MTT Properties Sdn. Bhd. and the Penang Islamic Religious Council (MAINPP) to discuss the release of the charge and the handing over of the mosque site at Projek Botanica CT. Affin Bank has agreed to release the charge in favour of MTT Properties Sdn. Bhd., and MTT Properties also informed that it has appointed a lawyer for the documentation process for the release of the charge with the bank. Next, MTT Properties Sdn. Bhd. will transfer ownership of the land lot to MAINPP. Regarding the development of the KAFA Menengah Programme of the Penang Islamic Foundation, in reply to the Honourable Member for Sungai Dua, KAFA Menengah was pioneered in 2019, beginning with three (3) KAFA Menengah at three (3) mosques in the district of North Seberang Perai. In 2021, the Penang Islamic Foundation (YIPP) took a new step after being given a mandate by the MMK for Religious Affairs to implement the Penang KAFA Menengah programme, which is a continuation of Islamic education at secondary school level. Penang became the second state to implement the KAFA Menengah programme after the State of Johor. The Penang Islamic Foundation has received strong cooperation from the Selangor Islamic Religious Department (JAIS) to ensure this programme achieves its objective, namely to provide additional Islamic education to students at secondary school level who are teenagers. As is well known, teenagers are exposed to various influences and like to try new things. If no emphasis is given to our Muslim youth, we are very worried that they may fall into unhealthy matters such as drugs and other social problems. To date, a total of 11 mosques have implemented KAFA Menengah throughout the State of Penang. In 2022, YIPP (Yasasan Islam Pulau Pinang) plans to expand this programme to more mosques. The acceptance feedback from parents and students has also been very encouraging. For example, at Masjid Al Bukhary, Jelutong, 98% student attendance was recorded during the first quarter of 2022. This shows that students and parents give their full support to this programme. As additional information, the Penang Islamic Foundation this year has begun exploring a new programme to help tahfiz students in Penang sit for the SPM examination. To date, there are 46 tahfiz centres that have registered with the Penang Islamic Religious Affairs Department (JHEAIPP). The diversity of curricula and methods of Al-Quran study has caused some tahfiz to focus only on Al-Quran memorisation without taking the SPM examination. This makes it difficult for tahfiz graduates to obtain employment or to continue their studies at institutions of higher learning. Therefore, YIPP has begun efforts to implement the Iltizam Huffaz Programme, namely a special tuition class programme for tahfiz students to sit for the Malaysian Certificate of Education (SPM) examination. Hence, I would like to call on all tahfiz centres to take the opportunity provided by the government to ensure that the opportunities and future of students are more secured with the SPM certification. Honourable Dato' Deputy Speaker, in answering the question of the Honourable Member for Sungai Dua, also relating to… (interruption).
Explanation. Thank you, Pinang Tunggal. Thank you, Dato' Deputy Speaker. I just want to touch on KITAB that was presented earlier. Thank you for the very detailed presentation on the vision and aspirations of KITAB towards becoming a university. KITAB is an institution that has rendered very much service to Penang since its establishment, producing many tahfiz. In Permatang Buluh, Cikgu Usop's child, there are two (2) people who indeed came from KITAB. Now they are teachers and Imams, preachers and so on. Much of the output from KITAB, from its original concept, and now we want to move towards a university, and in this context I think we need to make many preparations, many things that we need to fulfil in order to reach the level of that recognition, there must be requirements, and there are conditions that we must fulfil, criteria and conditions.
So, our preparation, I am afraid we look too far ahead, we want to do various courses, perhaps various fields, perhaps we want to go into fields other than tahfiz, perhaps we want to do other fields. We say international, perhaps other countries will also come in, we have twinning with any Al Azhar and so on, which later will attract and enable upgrading. But I am worried about our preparation to reach that level. Our preparation, our expertise, our workforce and so on need to be updated and strengthened a bit more, because if we say we want to chase what is ahead, we may not get what is in our hands, and it will scatter. I am afraid we will simply lose out. I want to produce a KITAB, to make KITAB do something very great, and if possible, the tahfiz students have room to continue studying there. So, they should not stop just there, there should be room for them to continue further. This means there is a link between KITAB and the many tahfiz in Penang and perhaps in other areas. So, that is one matter. Regarding the KAFA Menengah mentioned earlier, thank you for the explanation. However, KAFA Menengah may not have an examination, but if possible, we want to ensure there is also an examination to make sure that these secondary students who have fallen behind in KAFA Rendah, who do not know many things about prayers and so on, so there may also be some form of examination for them so that they really learn to understand, and there is something, not that we base it on examinations, no. But there must be another method to ensure that KAFA Menengah succeeds. This age group is very dangerous. If KAFA Menengah can prove that it succeeds, Alhamdulillah. Thank you very much.
Thank you, Honourable Member for Sungai Dua.
Thank you, Sungai Dua. To answer on the preparations made by KITAB, as I mentioned earlier, one of them is the MyQUEST criteria, and KITAB has also prepared a development plan. We have prepared a development plan for a new campus in Batu Kawan. In terms of financial preparation, as I mentioned earlier, we have explored new waqf sources, for example, so that we can meet the budget allocation needed to raise KITAB to an even higher level. Preparations in terms of co-curricular activities and teaching staff are also being pursued by KITAB's management. For the existing campus too, we are equipping it with PIDL, and with the Al-Hady Centre for Thought. All of these are complements that can upgrade KITAB's existing standing. So all of these are preparations that have been made to enhance KITAB's capacity, in keeping with its name. Its name was actually adopted a long time ago, not just tahfiz, but there was also international, an international college there, international and technology. So those are the fields in which we are equipping KITAB to become a leading research centre in Penang at some point in the future, InshaAllah. Okay, I will continue, where was I, KAFA Menengah. To the question also raised by the Honourable Member for Sungai Dua, the Warga Emas Complex was built under the funding of Yayasan Bukhary to add a care centre based on the Darul Hanan concept in other districts. So the Darul Hanan complex built under the funding of Yayasan Bukhary was built on part of the land owned by the Penang Islamic Religious Council, for the accommodation and care of senior citizens. Among the infrastructure provided are a hostel building, a therapy wing, a dining hall, a surau, a ward for the destitute, a multipurpose hall and a seminar room. This complex can accommodate a maximum of 150 senior citizens and began operations on 1 February 2010. The proposal to add another location is a good proposal to the Honourable Member, however, the Penang Islamic Religious Council (MAINPP) currently does not have such a proposal. Nevertheless, we welcome it, and we work together with several private care centres and we pay for some asnaf who need to pay costs at those care centres.
Issue of Surau Construction Site, Small Area and Angle Not Aligned with the Qibla Direction. In answer to the question raised by the Honourable Member for Bayan Lepas, the Penang Islamic Religious Council (MAINPP) is one of the technical agencies of the OSC Meeting at the Seberang Perai City Council (Majlis Bandaraya Seberang Perai, MBSP). Therefore, the Islamic Religious Council will require every developer planning to develop new housing in Seberang Perai to provide sufficient Islamic places of worship, whether a mosque site or a surau building for residential development, and a prayer room for commercial development. As for MBPP (Penang Island City Council (Majlis Bandaraya Pulau Pinang)), MAINPP is not a member of the OSC Meeting. However, MAINPP is invited to give comments on the provision of worship facilities for new projects. MAINPP is still liaising with MBPP to become a member of the OSC meeting so as to facilitate the implementation of the checking of such requirements.
Issue of Mosque Congregation Being Asked to Adopt the MasjidPro System Which Must Be Purchased by the Mosque.
In answer to the question of the Honourable Member for Sungai Acheh, through a letter from the Penang Islamic Religious Council (MAINPP) dated 18 February 2022, mosques throughout the State of Penang were advised, not required, to use the services of Myrich Dynasty Networks Sdn. Bhd., namely the supplier that has successfully developed the MasjidPro System, which has been implemented on a voluntary basis at several mosques, and they were initially several mosques in North Seberang Perai, Kepala Batas, with the efforts of those mosques themselves. For information, MAINPP does not force any congregation, and does not require any congregation to accept the MasjidPro ICT System for Management and Administration to use the service. Nevertheless, if the mosque concerned uses the above system, it will be useful for creating a comprehensive and uniform database to facilitate the administration, management and monitoring of all activities in the congregation concerned by the District Religious Administration, JHEAIPP, MAINPP and agencies including Zakat Pulau Pinang, Wakaf and so on. As far as the briefing sessions held in the five religious administrative districts are concerned, it was found that there was no objection at all and it received good feedback from the administration of the mosque congregations. The cost to be paid by each mosque is RM10,550.00 and an annual fee of RM699.00. However, the annual fee of RM699.00 has been abolished by the supplier. Nevertheless, the Penang Islamic Religious Council Meeting No. 2/2021 decided that Zakat Pulau Pinang (ZPP) would fund part of the costs involved, namely by providing a contribution of RM500.00 for each mosque that uses this MasjidPro System. MAINPP does not fully fund the cost of implementing this system so that mosques have their own initiative, in addition to encouraging congregation members to communicate two-way with the mosque chairman and ensuring the full participation of all mosques so that this system can be used/applied optimally. So MasjidPro is a mobile phone application and also a database system.
In answer to the question of the Honourable Member for Seberang Jaya, the Penang Islamic Foundation (Yayasan Islam Pulau Pinang, YIPP) has collaborated by appointing the Penang Development Corporation (Perbadanan Pembangunan Pulau Pinang, PDC) as the Project Management Office (PMO) for the Penang Islamic Hospital project. PDC has carried out a re-evaluation study of this project and is in the process of preparing the results of the study. The Penang Cooperative Development Proposal, last but not least, I would like to touch on what is being hotly discussed today, the matter that is being hotly debated, namely the CLQ (Central Labour Quarters) or workers' hostels. This is related to the Penang Technology Park at Pinang Tunggal or in Bertam. The proposal to build the Penang Technology Park concerns industrial lots in an area of 800 acres that has been approved for industrial development within the Bertam urban development area in the Pinang Tunggal State Constituency. The initial approval was as far back as 2004, but it was not continued until recently when a company took over as the new developer and submitted an application for Planning Permission for Phase 1 of approximately 250 acres to the Seberang Perai City Council. As mentioned by the Honourable Member for Sungai Dua, the Planning Permission that has been submitted does not yet include workers' hostels. The State Government supports this development proposal because it can create employment opportunities for the residents of Bertam and Kepala Batas and help the state provide a new, planned industrial area. For the information of this House, the development of the Bertam Estate covers approximately 4,000 acres, and several new developments within the area so far have focused only on residential development, with no commercial element at all to complement the residential development, and so far approximately 20,000 units have been occupied. And for information too, the application for this project proposal is subject to the proposal for this technology park project also being subject to all technical requirements, including the preparation of a Traffic Impact Assessment (TIA), Social Impact Assessment (SIA), Environmental Impact Assessment (EIA) report and other technical requirements. So, if in Bertam there are so many residents living in the Bertam area, who every morning start driving to work in Juru, in Batu Kawan, in Bayan Lepas, then if there are many job opportunities in Bertam itself, it will certainly make the journey to work every day easier, thereby solving the traffic problem in Bertam itself and perhaps also contributing to easing traffic congestion in Seberang Perai…(interruption).
Thank you. The Honourable Member's intervention, I want to ask Pinang Tunggal whether they agree that the planning permission has entered that area and that the 800-acre industrial area has been zoned. Do you agree or not if these workers' hostels, these CLQs, are built there? Do you agree or not if we ensure that the type of industry that will be built there, will be implemented there, is a type of industry that is not related to pollution, not much smoke comes out, perhaps not much in terms of sewage, and so on, which would cause the residents in the area to be affected because it is too close, Padang Kota is very close, some are about 50 metres away, and the surroundings are approximately 5 kilometres fully filled with residential areas. So the residents there are not ordinary people, they are the middle-class and also elite. My lecturer lives there, my former lecturer at UUM, I studied under him, he is a bit older than me, my lecturer Dr. Shukri, Associate Professor Dr. Shukri, he is among the action committee chairmen there, I am also worried, afraid that it will become like what happened in Bayan Lepas. It will become a problem for Pinang Tunggal itself tomorrow, I don't know. Thank you.
I am also worried, yes, but there is a way for us to deal with that concern. If it is like 800 acres, this is an area that has already been identified and allocated for industry. So, and we hope that the job opportunities that will be created can be filled by local people, people in the area also work, so there is no need to create any so-called staff settlement for the industry there, no. It is not necessary, but if the local people do not have talent, because it matches the name Penang Technology Park, the name itself, the government has agreed to use Technology Park, meaning this is not an ordinary industrial park. Ordinary like Sungai Dua just mentioned. So Penang Technology Park, that is why the name itself is already technology, meaning hi-tech, so we hope that the industries that will enter this area are industries that do not use a lot of labour, high-talent, for example, what do you call it, computers, research, right, high-end, what do you call it, industry. So if that happens, InshaAllah, it will be utilised by local people who will gain greater benefit. But first of all, if it can be utilised by local residents, it is better. Second, if talent from outside is needed, we hope for local talent, not foreign, not foreigners. However, if foreigners are still needed to work there in future, then that is where the special accommodation is necessary. We do not want these foreigners to live together with the existing local residents…(interruption).
I think like this, Pinang Tunggal, I hope that if we can hold a engagement session organised by the State Government and the Council, a engagement session to discuss this matter, and if possible I am really against this project. Although I live in Tasek Gelugor, I feel sorry for the people over there, I don't want it, the factory is okay. I see that the factory can bring benefits, provide jobs and so on to the surrounding community, including Tasek Gelugor, including the Penang Island area. But for the hostel, I would ask that it be considered a thousand times over, whether to build it or not. Thank you.
I suppose the parliamentary campaign has already started.
Alright, thank you. Thank you, Sungai Dua, for the suggestion. On the part of the State Government, we are indeed aware of this matter, and we have in fact taken early measures by setting up a monitoring committee under the EXCO, which reports to the EXCO. I myself chair this committee. Its members are Honourable Phee Boon Poh, Honourable Dato' Haji Abdul Halim, and other agencies involved, such as Seberang Perai Municipal Council (MBSP), the Department of Environment (JAS) and others, to ensure that the Technology Park proposal complies with the requirements of the State Government. This includes pollution and the types of industry to be established, and one more thing, PGC will also be involved in this committee.
The immediate step we are taking now is that, Insha Allah, we will hold road shows or engagement sessions in the form of Town Halls, which have been arranged for perhaps the middle of this month, so that we can obtain, Insha Allah, the views of the people involved and the residents around the area, and we will consider those views. Let me continue, and I want to stress that if it is approved. For example, if this hostel is approved, all technical aspects will be taken into account, including the buffer zone. The facilities to be provided for this accommodation need not necessarily be CLQ hostels. Perhaps the staff accommodation could be in a higher-class style with commercial facilities and a recreation hall; it would not be merely a hostel. So, the provision of this workers' hostel, we will ensure that it meets the Workers' Minimum Standards of Housing and Amenities (Accommodation and Centralised Accommodation) Act 2020 Akta 446 and also the guidelines, the guidelines that have been issued by the State Government Authority. For the information of this honourable House, as I said, what we hope is that the people of Bertam themselves and the people of Kepala Batas themselves will be able to work there. So we no longer need to build hostels, or build accommodation, right? So everything is for local people. That is what we hope for. If that is what happens, Alhamdulillah. I hope the explanation just now has answered the questions raised by Honourable Bayan Lepas, Honourable Bertam, Honourable Penaga and also Sungai Dua. I will touch briefly on the MMK Koperasi. Honourable Dato' Deputy Speaker, the empowerment of cooperatives in the State of Penang is important in efforts to make a positive contribution to the economy and society of the people of Penang. According to the Malaysian Cooperative Commission Penang Branch (SKMM), as of December 2021 there were 776 cooperatives registered in Penang, an increase of 22 cooperatives compared with 2020, with membership registration totalling 191,202 members compared with 152,172 in the previous year. The performance of cooperative assets in the State of Penang has shown an increase of 8.75 per cent compared with the previous year, with total assets amounting to RM1.07 billion in 2021. In addition, revenue performance also shows an increase of 4.18 per cent, with total revenue amounting to RM283 million in 2021. This improvement in performance is driven by several factors, among them the provision of assistance to cooperatives to revitalise business activities and the campaign to buy goods and products issued by cooperatives through the organisation of the Pasar Koop programme in Penang. As a State Government that is caring towards cooperative development, the Penang State Government has also continued the Penang2030 Coop Grant assistance to stimulate and help the cooperative ecosystem become more competitive in facing this new normal. The Penang State Government has allocated grant funds amounting to RM300,000.00 to small cooperatives in the State of Penang in this year of 2022. For your information, the Penang2030 Coop Grant was first introduced last year, and the initial fund allocated was RM300,000.00. With this amount of funding, each year the State Government can help at least 20 to 30 active cooperatives in the State of Penang. I will touch briefly on the MMK Community Empowerment. Up to 31 May 2022, a total of 375 MPKK have been approved for establishment as follows: (a) North East - 92 (b) South West - 59 (c) North Seberang Perai - 84
(d) Central Seberang Perai - 84 (e) South Seberang Perai - 56
A total of 375 MPKK with 5,625 members. The State Government, under the Community Empowerment portfolio, has taken the initiative to arrange a Group Personal Accident Takaful for members of the Kampung Community Management Council (MPKK) in the State of Penang. The State Government has appointed Etiqa Insurance & Takaful to provide the accident takaful. This accident takaful is provided to all 375 existing MPKK involving the 5,625 members mentioned earlier. Compensation will be paid to MPKK members for any type of accident and is covered within 24 hours. Hospital bill claims may be made each time of hospital admission based on the amount of the bill, with a maximum payment of RM500.00. Compensation claim payments will be deposited directly into the recipient's account. The breakdown of compensation is as follows: (a) Death - RM20,000.00 (b) Permanent Disability - RM20,000.00 (c) Hospital - RM500.00 (d) Funeral Arrangements - RM1,000.00 Apart from that, for the year 2022, the State Government under the Community Empowerment Portfolio is also organising the Kampung Community Management Council Disaster Management Course, which is held with the aim of increasing knowledge on disaster management procedures among MPKK throughout the State of Penang. Disaster Management Courses for each district have been and will be carried out according to the district breakdown and dates as follows: (a) South West - 29 March 2022 (b) North East - 6 March 2022 (c) North Seberang Perai - 26 June 2022 (d) Central Seberang Perai - 25 June 2022 (e) South Seberang Perai - 2 July 2022. In an effort to strengthen and empower the leadership of women in MPKK, the MMK Community Empowerment, in collaboration with PWDC, has successfully organised two (2) sessions of the Women's Leadership Development Workshop. This programme successfully gathered more than 200 participants from the women's leadership of MPKK and JPWK to take part in the workshop. The workshop was successfully carried out on 28 May 2022 in the Seberang Perai division and on 29 May 2022 in the Island division. Before I take my leave… (disturbance).
Seeking clarification from Pinang Tunggal regarding takaful for MPKK. I want to know when the takaful came into effect, and so far, has any claim been made, any claim made among the MPKK in Penang. That is all I want to know. Thank you.
Thank you, Machang Bubuk. This personal accident takaful was started last year and was organised until last year, when it expired on 30 April. However, we extended it from 1 May until 30 April 2023 for a second year, and several claims have already been made under this takaful and have been processed. I cannot give the exact figure. Perhaps I recall there were deaths, and also hospital claims, and only permanent disability… (disturbance).
Pinang Tunggal, perhaps you can obtain a written reply later. Thank you.
I will give a written reply to Machang Bubuk, Insha Allah. With that, I would like to record my highest appreciation to the State Secretary's Office, the State Economic Planning Unit, the Management Services Division, all District and Land Offices, the Penang Islamic Religious Affairs Department, the Penang Island City Council, the Seberang Perai City Council, and everyone involved in the matters that my office deals with in carrying out our duties. May the cooperation that has been established continue in the times to come for the progress and prosperity of the State of Penang. That is all, thank you. I beg to second the motion.
Thank you, Pinang Tunggal. Honourable Members, the meeting is adjourned, and the House will reconvene on Friday, 3 June 2022, at 9.30 a.m. That is all, thank you.
The House was adjourned at 6.15 p.m.