Secretary of the HouseEN

Honourable Members, Honourable Speaker of the State Legislative Assembly. Prayer recitation.

Deputy Secretary of the Dewan

“Bacaan Doa”.

Secretary of the House

Soalan lisan.

Speaker (Speaker)EN

Good morning, Honourable Members. We reconvene with the oral question session. I would like to invite the Honourable Bukit Tengah. Please.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Good morning Dato’ Speaker. My question is Question 48. No. 48. State the current status of the development progress of the Swettenham Pier Cruise Terminal, which is so important for the state's tourism sector. (a) State the detailed particulars of each phase together with the development cost of the project. (b) State the timeline for completing the project and whether there are any delays.

Yeoh Soon HinDAP · PHPaya TerubongEN

Honourable Dato' Speaker, Honourable Member. To answer the question from Bukit Tengah. The tourism industry is among the important economic pillars for the State of Penang, and in the pre-pandemic era various efforts were carried out to restore the performance of the tourism industry. These include upgrading tourism infrastructure and diversifying tourism products. In this regard, the upgrading of the Swettenham Pier Cruise Terminal (SPCT) began in 2020 and will be carried out in four phases. Namely Phase 1A, Phase 1B, and the second phase and the third phase. To date, Phase A has been completed and finalised. Phase A, estimated at a total of RM95 million, covers the extension works of the jetty 220 metres to the north of SPCT, the construction of a new breasting and mooring dolphin measuring 50 metres and 68 metres respectively, as well as the construction of two bridges for the new breasting and mooring dolphin.

Phase 1B, estimated at a total of RM4,623,793.00, will focus on the Development of Preliminary Upland, namely reducing the wide space and installing gangways or boarding bridges. Phase 2 and Phase 3, namely the new home port terminal, are estimated at a total of RM55,391,261.00 and will involve terminal improvement works involving the restructuring of the existing terminal, the existing northern entrance road being converted into two-way vehicle access connecting to the apron, and the addition of new connecting routes. Phase 1A began in May 2020 and was completed in July 2021. Phase 1B has been fixed and is expected to commence in 2023 and is expected to be completed within 12 months from the start date. Phase 2 and Phase 3 are expected to commence in 2024 and are expected to be completed within a period of 12 months as well. Based on the timeline of the SPCT development plan as stipulated, there is indeed no delay in the implementation of the project.

Speaker (Speaker)

Terima kasih.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Thank you Honourable Member for your answer to my question. Of course, the major Swettenham Pier Cruise Terminal development projects are very important for our state's tourism industry. So my question is, with these projects in place, how, what plans or strategies does the government have to ensure that other tourism industry players will benefit from the projects mentioned earlier. Just one additional question, following yesterday's news report that our sea borders remain closed because the Immigration Department has not yet reopened. What is the route for cruises to be able to enter, for ships to be able to enter Malaysia and Penang in particular, and this will certainly affect our tourism in Penang. We have all have been waiting and excited for the cruise untuk sampai Spectrum for the Spectrum to arrive, which allegedly will arrive this month. So what is the Honourable Member's view on this issue, which is quite serious. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you Bukit Tengah for answering part one of the Bukit Tengah question. The State Government is indeed in the process of planning a heritage trail around SPCT, including the UNESCO World Heritage site. Considering that Penang Port, namely the terminal, our Cruise Terminal is the only port located on a UNESCO world site, the only one where cruises come in, go straight out, and go straight out of the port will enter the UNESCO world heritage site. Penang Port is one of its kind in the world, and this is also a uniqueness and special privilege of the port for Penang. And the heritage trail to be planned by the State Government will ensure that other tourism industry players, including tour guides, including food and beverage operators, including souvenir shop owners, will benefit economically and in terms of income from the arrival of tourists from these cruises. And at the same time the State Government will also examine other aspects such as traffic, logistics, and the status of infrastructure readiness to ensure that the arrival of many tourists at one time, in flux of tourist at one group because one cruise will bring over thousands of tourists, so that the arrival of these tourists does not become a traffic disruption to the nearby areas.

And regarding the second part of the Honourable Member's question. As EXCO for Tourism who has a high aspiration to restore Penang's economy, I too am very disappointed and regretful about the closure, still closed, closure of Immigration to cruises, the arrival of these cruises. Indeed all industry players and the State Government have been waiting for the arrival of cruises. Because these cruises can indeed bring many tourists and I really hope the Immigration Department can as quickly as possible lift the bank to the cruise so that, because now we can see that air can also bring tourists, surely the sea cannot bring tourists. So I too hope the Immigration Department can expedite this process.

Speaker (Speaker)

Terima kasih.

Laluan. Thank you Dato’ Yang di-Pertua and Honourable Paya Terubong. Regarding heritage, I was interested in what was raised about heritage, so Penang is a state with many heritage resources including in Seberang Perai and so on. Heritage buildings, heritage places, and also.... (interruption).

Speaker (Speaker)EN

Honourable Member, this is a specific question.

Okay-okay, in terms of culture and so on. What steps or strategies does the State Government have to take into account heritage outside Penang Island, on the mainland and so on, culture and so on, in order for us to strengthen and consolidate tourism in the State of Penang. Thank you.

Speaker (Speaker)EN

Honourable Member. Not quite relevant to the main question, lah. So, sorry. This is not related to Swettenham Pier. Okay, I would like to invite the next names, Honourable Seberang Jaya, Seberang Jaya is not present. This question is skipped. Honourable Telok Bahang, Teluk Bahang is also not present. CM, it's alright to remain seated. The question is also skipped. And I would like to invite Bukit Tambun.

Goh Choon AikPKR · PHBukit TambunEN

Thank you Honourable Dato' Speaker, my question is Question No. 51. No. 51. Describe the water quality level of all rivers in Penang and state the water quality parameters of each river. (a) Describe the sources of pollution in Sungai Pinang, Sungai Juru, Sungai Junjung and Sungai Jawi.

(b) How can river basin management and green drainage systems be implemented? (c) What are the actions against river polluters?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you Dato' Speaker and also Honourable Bukit Tambun for the question. The Honourable Member refers to the Environmental Quality Report 2020; rivers in Penang on average are in Class 3, namely it is categorised as moderate. The dominant parameter polluting most rivers in Penang is contributed by Ammoniacal Nitrogen. There are many sources causing river pollution in Sungai Pinang, Sungai Juru, Sungai Junjung and Sungai Jawi. Among the sources of river pollution are from point sources, namely from food premises, small industries, vehicle workshops, solid waste discharge, sewage and domestic waste from traditional settlements. Meanwhile, pollution from non-point sources is a source of pollution that cannot be identified. For the Honourable Member's second question, green drainage systems are part of the components of the IRBM or Integrated River Basin Management Plan, namely enhancing environmental conservation. The implementation of the work components outlined in the IRBM is carried out by various agencies according to their respective provisions and jurisdictions. Therefore, the management of river development must be addressed in an integrated manner. Every technical agency, including local authorities (PBT), must work together shoulder to shoulder to address the issue of river cleanliness in order to realise green river drainage. For the Honourable Member's third question, enforcement actions against river pollution are carried out by various agencies according to their respective jurisdictions. For example, the Department of Environment takes action based on the Environmental Quality Act 1974. Periodic enforcement is carried out according to the annual programme prepared, including blitz and integrated operations. Among the actions taken against sources of industrial pollution are on-site directives, directive notices under Sections 31 and 37, compounds according to offences under the relevant regulations, and also court action. According to the PBT, actions taken against river pollution are based on the Local Government Act 1976. Among them are the issuance of notices to stop operations of premises or requiring the removal of nuisances, offers of compound, licence revocation actions, legal action, seizure or confiscation of equipment that causes pollution, and so on. Meanwhile, apart from that, the State Government also has the Water Supply Enactment which empowers the Director of Water Supply of the State of Penang to take action under the said enactment.

Speaker (Speaker)

Terima kasih.

Goh Choon AikPKR · PHBukit Tambun

Soalan tambahan.

Speaker (Speaker)

Sila.

Goh Choon AikPKR · PHBukit TambunEN

Honourable Dato' Speaker. Thank you to the Honourable Tanjong Bunga for the answer given. My first supplementary question: Penang relies 85 percent on treated water from the Muda River for public use in Penang. However, for the past two (2) years the Menteri Besar of Kedah has repeatedly triggered the raw water issue, causing uncertainty, and at the same time the Sungai Perak Raw Water Distribution Scheme has also not been finalised. Therefore, we need to find raw water sources from rivers within the State of Penang. To get an answer from the Honourable Tanjong Bunga, which river in Penang is actually suitable for treatment? Second question, rivers are the property of the State Government and are maintained by the Drainage and Irrigation Department (JPS). However, under the provisions of the Environmental Quality Act 1974, in the Environmental Quality (Industrial) Regulations 2009, Environmental (Sewage) Regulations 2009, the regulations concerning industry are only limited to licensed industries, and as for sewage, it only relates to sewage after being treated and discharged by IWK. There is no provision to take action against other polluters including illegal industries, including in terms of livestock farming. Therefore, how can we take action against river polluters other than what is provided under the Act?

Speaker (Speaker)EN

Thank you. Please.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you Honourable Member for the two (2) very important questions. The first, the strategy actually taken by the Penang Water Supply Corporation (PBA) to ensure the sustainability of water supply in the State of Penang is, firstly, we need to maximise the existing raw water sources, namely Sungai Dua, Sungai Muda, which we take from, which has still not been maximised. Because of that, there is a new water treatment module being built at the Sungai Dua Water Treatment Plant which will add at least 114 MLD to production, and in addition to that, new treatment plants at Mengkuang Dam and also at Sungai Muda will be built. All are in planning. Each of those plants will add approximately 114 MLD as well. And after we maximise all existing raw water sources, then we will look for new sources as the Honourable Member mentioned earlier. Based on studies and also based on the existing water quality in rivers of the State of Penang, Sungai Perai has the greatest potential to be used as a water source. However, the water treatment of Sungai Perai, and we also need to ensure that the sources of pollution along Sungai Perai must be addressed first. If not addressed, it will be rather difficult to use water from Sungai Perai.

For the Honourable Member's question, I understand what the Honourable Member has stated earlier. Under the Environmental Quality Act, there are regulations that apply to premises that discharge or release industrial effluents and also sewage. However, for other pollution we also have other regulations and laws that can be used. For example, the PBT uses the Local Government Act specifically, by-laws, such as if it is the Penang Island City Council (MBPP), it uses the Public Cleanliness and Public Safety By-Laws, and they can take action. Also other laws under the Local Government Act if, as the Honourable Member mentioned earlier, illegal factories. For illegal factories we can take action based on the powers of the PBT and also to remove nuisances and so on. In addition, if the river is a water source, then it is subject to the Penang Water Supply Enactment. That is also one of the sources of authority that we can use to take action. Thank you Honourable Member.

Speaker (Speaker)EN

Thank you. Honourable Kebun Bunga, please.

Ong Khan LeePKR · PHKebun BungaEN

Dato’ Yang di-Pertua Speaker, my question, 52. No. 52. Why have the various maintenance problems at the Padang Tembak flats still not been resolved from 2008 until now?

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Good morning and Greetings of peace Dato’ Speaker and to my colleague from the Kebun Bunga constituency who has asked the question regarding housing maintenance problems, particularly in Padang Tembak. Dato’ Speaker, the State Government has always placed the well-being of the people as the most important agenda and we have indeed proven it through the disbursement of allocations and approval of high-impact projects not only in the provision of housing but secondly, the most important, is also maintenance. So this question is very important to me. From 2008 until April this year, the State Government of Penang has spent a total of RM297.57 million. This is from the State Government, not the Federal Government Dato’ Speaker, which covers 32,582 maintenance works in all public housing and also eligible private housing areas across all five (5) districts in the State of Penang. Out of that total Dato’ Speaker, a total of RM244.97 million covering 32,045 maintenance works in public housing, while the balance was for private housing where 537 works were carried out at a cost of RM52.596 million. Now, Rumah Pangsa Padang Tembak is one of the oldest strata housing schemes, not in Penang, in Malaysia, one of the first that was completed and built since 1969, Dato’ Speaker and we at Padang Tembak have now reached 53 years. This is the oldest in Penang not only here, possibly in the whole country, Dato’ Speaker. With a building of such age, there are indeed various maintenance problems in the scheme and the State Government, which is very caring, has since 2008 spent a total of RM14.03 million to carry out various maintenance works across all nine blocks, there are nine blocks there, in Padang Tembak.

Now, for this year 2022, an allocation totalling RM2.4 million has been approved by the State Government for projects to be carried out in the Padang Tembak housing scheme area. Among these projects are Dato’ Speaker, repair works for building cracks, replacement works for the Main Reticulation Pipe to the water pump, waterproofing repair works on the roofs and rewiring works for corridor lights and main switchboards which bring about that cost. Thank you, thank you very much.

Speaker (Speaker)EN

Thank you. And next I would like to invite the Honourable Pulau Tikus. Pulau Tikus, please.

Lee Chun KitDAP · PHPulau TikusEN

Thank you Dato’ Yang di-Pertua, my question is number 54. No. 54. What assistance and support has been provided by the Federal Government to the Penang Island City Council and the Seberang Perai City Council since 2018?

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Thank you, Dato' Speaker. Thank you to my friend from the constituency of Pulau Tikus, who asked an important question: "What assistance and support have we received from the Federal Government for our two local authorities, namely Majlis Bandaraya Pulau Pinang and Majlis Bandaraya Seberang Perai, since 2018?" Dato' Speaker, Majlis Bandaraya Pulau Pinang has indeed received financial assistance and support from the Federal Government from 2018 until now, in the form of the Management Grant and Development Project Grant, where the detailed particulars are in the answer, whereby every year we have received it and we say thank you for that. But this is not our entire request. There is much more that I will come to in a short while. The Management Grant covers the Equilibrium-Based Annual Grant and the Reimbursement Assistance for Street Lights and Traffic Lights received by MBSP from the Ministry of Housing and Local Government (KPKT). Now, the grants for development projects that MBPP has received cover several projects such as the Malaysia Housing Maintenance Fund (TPPM), that goes through the PBT, Dato' Speaker, they applied whichever scheme applied to the PBT. We also have the Urban Poverty Eradication Programme and house rehabilitation. We have also received a grant for the upgrading of the toilet system at Pasar Chowrasta. We have also received funds for the rehabilitation and upgrading of toilets at Pengkalan Weld as well, and generally for our Clean Public Toilet campaign, the upgrading of back lanes has also been received. We, of course, MARRIS, we also have, apart from that, the Master Plan Study, several studies, in fact this is one where we applied for assistance and have received it, for the Safe City Programme we also received, an allocation from MOTAC was also received by us through MBPP, and of course, as I have said just now, poverty eradication and several infrastructure projects we have also received. The financial assistance and support provided by the Federal Government to Majlis Bandaraya Seberang Perai is in the form of the Management Grant and development projects, where I have detailed the amounts from 2018 to 2022, Dato' Speaker. Every year there is, and we say thank you, but there is still much more that we have requested

that has not yet been disbursed. Now, the Management Grant covers several matters in the Seberang area, including reimbursement of electricity bills, this is something that happens every year. It is a policy by KPKT to reimburse us for that. And what was received by MBSP, this is what MBSP received from KPKT. As for the project grants, Dato' Speaker, they cover allocations received from the National Landscape Department (JLN), KPKT, Lembaga Pembangunan Pelaburan Malaysia (MIDA), the Federal Development Office (ICU), the Ministry of Finance, the Ministry of Home Affairs, and the Strategic Programme for Empowering the People and Economy. This is, among others, what we have received, and we say thank you, but we hope that, apart from this, our further and subsequent applications can be considered. Thank you. Thank you.

Speaker (Speaker)EN

Thank you. Please, Pulau Tikus.

Lee Chun KitDAP · PHPulau TikusEN

Thank you, Honourable Datok Keramat. I would like to ask: when compared with other states, does Penang obtain a fair allocation from the Federal Government for our local authorities? Thank you.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

The very simple answer is I do not have information about other states, but what I know concerns our state, but as I have stated, there are many other projects. In my speech a few days ago, I have already touched on several matters, in fact your own area underpass we are also asking from them, and we have repeated our request RM25 million, TPPM, we have a request of nearly RM134 million for maintenance but until now not even RM10 million has arrived. Other projects such as URC also at Padang Tembak, just now I've just answered your question I've answering before. This are all pending. So we hope the Federal Government can give attention and we hope that funds can be disbursed to the State of Penang as soon as possible. Thank you, thank you.

Speaker (Speaker)EN

Thank you, Honourable Datok Keramat, and next, the question from Honourable Permatang Pasir. No question has been skipped, and I would like to invite Honourable Air Itam.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you, Dato' Yang di-Pertua Dewan Undangan Negeri. My question is Question No. 56. No. 58. It is understood that the unemployment rate among youths in 2020 to 2021 was high due to COVID-19, and the State Government of Penang, through PYDC, held the We Want You Programme to help young people obtain employment opportunities.

(a) How many or what percentage of youths have been successfully hired as permanent employees through this programme after it was launched?

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Yang di-Pertua Dewan Undangan Negeri. Thank you for the question 56. The We Want You…(with permission) career search portal initiative. Yang di-Pertua Dewan Undangan Negeri is a career search portal and a matching platform between employers and employees through the website pydc.com.my/career, launched in 2020, 6 May June by Y.A.B. Ketua Menteri, our Chief Minister, that is two years ago, to help youths find employment during the COVID-19 pandemic. Youths can use this platform to find various new jobs such as permanent jobs, part-time jobs and freelance work. This channel can be used to explore various new jobs. So far, there are 518 employers who have registered on this portal and have advertised a total of 2,198 vacancies. A total of 2,412 people have registered as users on this platform. As of May 2022, there were 1,199 youths who have applied for jobs through this platform, and the percentage who successfully obtained jobs through the We Want You…(with permission) platform, Dato' Speaker, is 29.02 percent.

Speaker (Speaker)EN

Thank you, Honourable Bagan Jermal. Please, Honourable Air Itam.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you, Honourable Bagan Jermal, for the efforts of PYDC. My supplementary question is whether the We Want You programme is open to all youths or only to a select group, and secondly, how many open interviews have been held in urban and rural areas this year up to now? Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Honourable Dato' Speaker, and also for the supplementary question from Honourable Air Itam. Indeed, the We Want You platform is one where we aim to attract large companies, shops including retail shops, coffee shops, any party that wishes to hire workers, including employers who wish to take on interns or service centres, any party who wants to bring in interns may also post such advertisements on the We Want You platform, and this platform is free. Therefore, these vacancies are open to drivers, also there are storekeepers, purchasers, cashiers, operators, part-time work, and also engineers, officers, doctors, nurses and others, and this platform is indeed free. Just send it to PYDC or contact PYDC, the design, send everything to PYDC and PYDC will handle it. The second supplementary question, where is the plan to hold interviews in urban or rural areas. During the pandemic last year, in 2021, after the establishment of the youth centre platform, where we have Pusat Belia Tenaga Pongsu Seribu, Bertam, in the Balik Pulau area. All three of these youth centres are in rural areas. Last year, during the pandemic, we indeed conducted interviews via Zoom, and we succeeded in all three of these youth centres, we were able to offer or provide, help 40 youths who successfully obtained employment through Zoom interviews, as well as

this year we also have many Career Fairs that will be held or have been held, such as the Career Fair at Pusat Belia Bagan Jermal in March, the Career Fair at Sungai Pinang also at the Youth Centre in March, Pusat Belia Bertam in April, Disted College in April, and also the Career Fair of the Aidilfitri People's Carnival at SPU KADUN Pinang Tunggal over 4 days (7 May to 10 May). In addition, with the current situation, PYDC together with my office has collaborated with PERKESO (Social Security Organisation) and also other agencies or other universities, as planned this month, on 21 and 22, we will go to Kampar, Universiti Kampar, to bring companies from Penang to join us in holding a Career Fair within the university. This is one of the ways we want to give more space to youths and also to help corporate companies in the State of Penang that have invested so much money, so we want to help find jobs for them. Thank you.

Speaker (Speaker)

Terima kasih.

Supplementary question, I hope this question will not be rejected. Thank you, Honourable Yang di-Pertua Dewan Undangan Negeri. From the information I obtained, there are youths who are less interested in working, firstly, and also choose their jobs. So, does We Want You or PYDC carry out, together with departments and other agencies, a study of job requirements and the wishes of youths to work in what fields? Sometimes we hold interviews, hold Career Fairs, but the employers or companies that come do not meet the needs and wishes of workers in the surrounding area. Has such a study been done, and what is the way for us to overcome the issue of youths who are not interested in working, but would rather comfortably stay at home playing games and so on? This is something we must also look at. Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Honourable Dato' Speaker, and also thank you, Honourable Sungai Dua. It is a good question that many youths are less interested in working. In terms of discussions or analysis, our side and PYDC have once sat together with PERKESO to analyse why, every time in the State of Penang, we have many vacancies, but outside, many people say the economy is not good, their children still cannot find work, we give the We Want You link to them, their children, but after the interview they are still not interested or there are problems. Some aspects or elements, one element may be salary, the second element is transport. This happened when we held open interviews via Zoom at Pusat Belia Pongsu Seribu, Bertam. There were many young men and women in rural areas, in the village of Pongsu Seribu, who were interested and asked, "YB, we have no transport, how do we go to the factory in Bayan Lepas?" So we also directed this question or problem to the companies, and the companies offered that we would arrange transport to come and pick up workers or we would provide hostels for them. Here, one of the elements of the problem may be because the place is far and they are less interested in staying in a hostel, perhaps because at home there are parents who need looking after, but the reality is that at the same time we are promoting vacancies, and at the same time we must also find a way to understand the problems that young people are facing.

So, thank you for this question and the views, so we welcome views and suggestions that are better, so we can cooperate to help youths obtain employment, thank you.

Speaker (Speaker)EN

Thank you for the next question. Question 57 has already been answered together with Question 4, so I would like to invite the Honourable Batu Uban.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Thank you, Yang di-Pertua Dewan Undangan Negeri. My question is Question No. 58. No. 58. What is the current status of the LRT construction project? (a) What are the options for financial resources to finance this project? (b) Can this project be implemented according to plan?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker, thank you, Honourable Batu Uban. The current status of the Bayan Lepas LRT Project is at the stage of commencing the pre-qualification process to identify companies that are interested and qualified to build the Bayan Lepas LRT component. This pre-qualification process is expected to be carried out in the second quarter of 2022, followed by the RFP or Request for Proposal process in the third quarter of 2022, in which the State Government will invite interested companies with experience to submit their proposals. The State Government will appoint the most qualified and suitable company to implement this project. Apart from technical proposals, companies that participate in the RFP will also be required to propose a financial model to implement the LRT component. For example, bidders may propose repayment methods such as development rights, land swap, advertising revenue and also farebox income. So this is us giving a little flexibility to companies to make their proposals. Honourable Member, public transport projects such as LRT usually receive financing from the Federal Government, as I mentioned yesterday. Therefore, apart from using the RFP process to obtain proposals and financing models, the State Government also continues its efforts to apply for allocations from the Federal Government through Rolling Plan No. 3 in the RMK-12 so that Penang can make this project a success and overcome the traffic congestion problem. Honourable Member, so far, the Bayan Lepas LRT project has obtained approval from major technical agencies such as the Department of Environment, PLANMalaysia, and is now in the process of submitting the EIA report for the LRT alignment above Penang South Reclamation, including the LRT depot at Pulau A. This depot is a main component of the Bayan Lepas LRT and the Land Public Transport Agency (APAD) will submit the final approval for the LRT rail scheme after this EIA approval is obtained. Previously, we had obtained conditional approval. The Bayan Lepas LRT component is one of the main components in the Penang Transport Master Plan (PTMP), and this component is a long-term strategy to overcome the congestion problem. In the

public inspection, the public display held from August to November 2019, the LRT received support of 97.7 percent from 22,678 respondents who provided feedback. Therefore, the State Government remains committed to making this component a success to ensure the well-being of the people of the State of Penang in the future, thank you.

Speaker (Speaker)

Terima kasih.

Kumaresan a/l AramugamPKR · PHBatu Uban

Soalan tambahan.

Speaker (Speaker)

Sila.

Kumaresan a/l AramugamPKR · PHBatu UbanEN

Thank you, Dato' Speaker, and also Honourable Tanjong Bunga for the answer given. I have two (2) questions. The first is that Honourable Tanjong Bunga also mentioned that the State Government will make a fresh application to the Federal Government for Rolling Plan No. 3. I would like to ask, if that application is rejected by the Federal Government, then what is the State Government's strategy? Secondly, understanding the rate of increase in vehicles and also the traffic congestion that is happening, I feel it is time the State Government had a new mode of transport. I also want to know, my question is, what is the State Government's solution to address this problem apart from the LRT Project? Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Batu Uban. Firstly, we did make the application to the Federal Government, but we do not rely 100 per cent on this application, because we have already applied for a long time and never received it. If we did receive it, that would of course be appropriate, as we feel Penang State deserves to get it, because we see that the Federal Government regularly finances large public transport infrastructure projects in other states, including in Selangor. However, in Penang, although approval was once given before 2008 by the then Prime Minister, the Honourable Tun Abdullah Ahmad Badawi, who came from Penang, everything was subsequently withdrawn, and as the Honourable Member is also aware, all the assistance given by the Federal Government during the time of the Pakatan Harapan administration was also withdrawn. So when we make this plan, we do not rely 100 per cent on allocations from the Federal Government. Our financing strategy follows the base case, namely using the PSR reclamation land as the financing model, but we want to speed up this process, which is why we want to carry out the RFP this year. This RFP will invite companies to propose other financing models

that may be possible apart from reclaimed land, or other examples that I have just given. There may be other methods that can be considered, for example, Transit Oriented Development (TOD), so that they can recover their money. So this State Government will continue with what we have, as I mentioned earlier. Secondly, the question is of course that the LRT Project is one component of the PTMP. Apart from that, to tackle the congestion problem, the State Government is also carrying out construction, for example, the second package of the three major highways project, from Air Itam to the Lim Chong Eu Expressway. Work has already started in Section 1. If we go near Air Itam, near the Thean Teik Expressway, we can see that construction is ongoing and the work will continue. We also have Package 1, from Tanjong Bunga, Tanjong Tokong to Telok Bahang, and also the tunnel or third link, as an example. Apart from that, we also have the Pan Island Link 1 (PIL1) expressway, which I mentioned in my winding-up speech, so I will not elaborate. These are examples of projects that also aim to tackle traffic congestion. Apart from that, the initiatives which the Honourable Member is aware of, where we provide free bus passes and free ferry services, are intended to encourage the use of public transport in Penang State. If more people use public transport, there will be fewer cars during peak hours. So these are examples of the initiatives and efforts of the Penang State Government to tackle traffic congestion. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

Lee Khai LoonPKR · PHMachang BubukEN

Supplementary question. Thank you, Dato' Speaker. I have one question, and I also want to know the status of the Project Delivery Partner (PDP) for the Penang Transport Master Plan, which has an important role in making the projects under the Penang Transport Master Plan succeed, and what role they have played so far in obtaining the allocations to make the projects under this PTMP succeed? My question. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

The role of the Project Delivery Partner (PDP) is to assist the State Government. Firstly, from the technical aspect, since their appointment, many studies have been carried out using their earlier funds. So I think millions of ringgit have actually been spent. This includes all the requirements that must be complied with, such as the EIA that must be carried out, the SIMP that must be carried out, the Social Impact Management Plan and so on, the SIA - Social Impact Analysis, and all of these are included in the scope of work of the PDP. The PDP also assists the State Government in drafting and preparing the RFP that we are currently doing. For the LRT, for example, they are the ones who procure all the technical consultants who will help the State Government to draft the pre-qualification, the RFP and so on. Of course, in cooperation with BPEN, the Transport Section and the Penang Infrastructure Corporation, everyone collaborates. So, that is briefly the role of the PDP, but if you want more in-depth information, that can also be provided. Thank you.

Speaker (Speaker)EN

Thank you. I would like to invite the Honourable Permatang Berangan.

Ong Khan LeePKR · PHKebun Bunga

Dato’ Speaker.

Speaker (Speaker)EN

There have already been more than three (3) supplementary questions.

Ong Khan LeePKR · PHKebun BungaEN

I have not yet... because this is important, Dato' Speaker.

Speaker (Speaker)EN

Even if it is important, I must follow the rules.

Ong Khan LeePKR · PHKebun BungaEN

Just a moment, Dato' Speaker.

Speaker (Speaker)EN

No. Honourable Permatang Berangan.

Nor Hafizah binti OthmanUMNO · BNPermatang BeranganEN

Thank you, Dato' Speaker. My question is number 59. No. 59. State Government-owned subsidiary companies (GLCs) (a) What is the role of GLCs and their strategy in helping the state's economic development? Explain. (b) Does the State Government have a plan to reduce GLC involvement in the private sector? Describe. (c) State the state assemblymen and Members of Parliament who hold positions, the period of appointment in GLCs and their total emoluments. List the information.

Y.A.B. Chief Minister: Thank you, Dato' Yang di-Pertua, and thank you to the Honourable Permatang Berangan for the question regarding State Government-owned companies or subsidiary companies (GLCs). To answer part (A), state-owned subsidiary companies (GLCs) indeed play an important role and work hand in hand with the State Government for our state's economic development. Among the approaches used by these GLCs are the following:

Implementing capacity-building programmes to provide human capital that can contribute to economic development. Implementing digital transformation to promote local enterprises to become digital and of international standard. Promoting local companies to attract more investors to Penang State and providing infrastructure that can contribute to the development of the state. A detailed explanation about these GLCs and their role in economic development will be placed on the Honourable Member's table after this session. For part (B), indeed the State Government has a plan for GLCs not to compete with the private sector in efforts to develop the state's economy. This is because the role and function of GLCs differ from those of the private sector, and they complement each other. If the Honourable Member examines my answer to A just now, most GLCs in Penang State do not conduct business, but assist the State Government in formulating policies and implementing advocacy, awareness programmes and so on, as shared by fellow EXCO members throughout this session. It seems only a few are involved in business. For question (C), the detailed information on the state assemblymen and Members of Parliament who hold positions, the period of appointment in GLCs and total emoluments is in Appendix B, which will be delivered to the Honourable Member. Almost all positions in GLCs do not have any remuneration apart from the title of director. Thank you.

Nor Hafizah binti OthmanUMNO · BNPermatang BeranganEN

Supplementary question. Thank you, Dato' Speaker, and thank you to the Honourable Padang Kota for the answer to question 59. I would like to ask: "Up to now, how many GLCs under the State Government are operating to provide support for welfare and public wellbeing work post-COVID-19?" and "What is the total contribution in financial or programme form that has been channelled to socio-economic development of the people in the last three (3) years?" and "Does the State Government intend to increase the establishment of new GLCs for other purposes, and what is the rationale?" Thank you.

Y.A.B. Chief Minister: Indeed, during the COVID-19 pandemic, the entire machinery of the State Government, the Federal Government and the Local Authorities worked hand in hand with civil society and NGOs in providing assistance to the people, and in line with this, each GLC has provided such assistance based on the functions and roles of the GLCs concerned. To answer the last part, we will indeed examine whether these GLCs are needed to support the portfolios of EXCO members, so that these GLCs become the operational arm of EXCO. For example, for the EXCO responsible for religions other than Islam, after consideration it was deemed necessary, so HARMONICO Corporation was established one year ago to enable this body to carry out functions to foster harmony, tolerance and mutual understanding among adherents of religions other than Islam, because Islam has MAINPP and the Islamic Religious Department which are responsible.

So, seeing the need to implement activities, programmes and so on, it was established because in the State Government administration there was indeed no unit, section or any body carrying out such responsibilities. So a body was set up under the name of a GLC, but in fact it is not involved in any business at all; it only does advocacy and policy formulation to help EXCO members carry out their respective duties in specific portfolios. For example, for green issues, the Penang Green Council was established to implement all policies, programmes, activities and advocacy related to green issues that are on the agenda in Penang State. Most GLCs function in this way. Thank you.

Thank you, Dato' Yang di-Pertua. I want to ask one question: does the State Government intend to make CMI into a GLC, and if possible a GLC? I request your view that we focus on agricultural issues and also food security. As in other states, for example Perak has the Perak State Agricultural Development Corporation, and perhaps we could also do so, can we or can't we do it? Thank you. Y.A.B. Chief Minister: Thank you to Dato' Leader of the Opposition for the suggestion. CMI can indeed be considered a GLC, but it was established through an enactment in the State Legislative Assembly, and at this time it has various portfolios. Earlier I said most GLCs are not involved in business; CMI is the only GLC that has business activities, but not directly, because it has been entrusted to manage government land so that this land can be commercialised. So CMI's role in this is to encourage the private sector to carry out economic projects on government land managed by CMI. Therefore, at this time, because I said it has various portfolios and does not have just one specific scope, there is indeed a component where CMI is involved in business, or through land held by CMI which is leased or rented out for agricultural activities and agro-based industries. So, regarding food security or, more accurately, food insecurity, we will look at how far this role can be developed through CMI or a new GLC, possibly an agrotech one. We have an agrotech portfolio under my leadership. I have reshaped and restructured this portfolio and named it Agrotech rather than agriculture as before. So our aspiration is to see the potential of agriculture as a business, using new technologies to improve agricultural sectors, production of yields and so on, and quality, so that although our state is small, even if we are not directly involved in planting, in processing we have an advantage as an industrial state. So thank you for the suggestion; perhaps in the new term, if there is an opportunity, we will see whether an agrotech-based GLC can be established to help implement this agenda.

Speaker (Speaker)EN

Thank you. I would like to invite the Honourable Pulau Betong.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Dato' Speaker, my question is number 60. No. 60. What are the State Government's efforts to bridge the development gap, the economic gap, the employment opportunity gap, the gap in well-maintained recreational facilities such as Taman Belia, the gap in improving education levels, the gap in quality road networks, and various other gaps between urban and rural areas? Penang must lead in bridging these gaps.

Y.A.B. Chief Minister: Thank you, Dato' Yang di-Pertua, once again. Thank you to the Honourable Pulau Betong for the question regarding the occurrence of development gaps and how to bridge these gaps. For the information of this august House, the State Government's efforts to bridge the various gaps between urban and rural areas are as follows. In brief, the State Government has launched Penang2030 Vision, prioritising A Family Focus Green And Smart State That's Inspire The Nation, and as has already been argued, our development is subject to the Penang State Structure Plan, as well as policies, planning and land use plans, and so on, through local plans, which is an effort by the State Government to ensure that both local authorities can control development and ensure that, directly or indirectly, development can reduce socio-economic disparities between rural and urban areas. Secondly, the State Government also places emphasis on providing basic infrastructure, with good coverage of water and electricity supply, as well as road network facilities. Among these infrastructures are roads and other sewerage treatment plants, and telecommunications, which are constantly upgraded and maintained from time to time to bring these services to areas that need them, to bridge the gap in access to these facilities. For example, the planning of telecommunications infrastructure development can also be seen through the infrastructure delivered to the people, particularly in rural areas, which was argued at length by the Honourable Tanjong Bunga, and this is an effort to narrow any differences that may occur in access to telecommunications infrastructure. In terms of welfare and eradication of Tegar poverty, the State Government has also implemented the Fair Economic Agenda Programme since 2009, which has since been rebranded as Fair Economic Agenda Assistance, where we ensure that every family receives at least RM944 a month, and the per capita rate is RM260 based on the 2016 poverty line income. So this too is hoped to bridge the gap for the affected group. One programme identified under Penang2030 is the baseline study of vanurable families and individual in Penang carried out by USM, where the study aims to identify families and individuals who are classified as vulnerable or want knowable group, so that appropriate action and assistance can be provided to improve their standard of living. The State Government also implements initiatives to reduce the gender gap in economic terms. The Gender Inclusiveness Policy was launched in 2019. This time, the Honourable Padang Lalang, perhaps awareness is now good enough, has mentioned less about the gender inclusiveness policies, which

are an important policy for the State Government in bringing gender balance and social development. Furthermore, through PWDC, various initiatives are also held to increase women's participation in the economic field. The State Government also intends to create more recreational spaces to bridge the gap and to enhance the liveability or liberality of Penang State's people through the many recreational projects carried out in Penang State. Although Seberang Jaya does not feel we have succeeded in passing 100,000 trees planted, now it is nearly half a million. They may think it is not important, but for the State Government it is something very important, to ensure riverbelity, and this is for all people, regardless of background or income level, to together enjoy a greener and cleaner state and to increase riverbelity in Penang State. The State Government also places emphasis on the education aspect so that human capital in Penang is of quality and meets the needs of the labour market. The Honourable Perai has stated that the problem we face now is not that there are no jobs, but that there are no workers. Earlier the Honourable Leader of the Opposition said there are young people who are lazy about working. So let us try to tackle this issue. This gap should not occur. We need to implement programmes that can reach groups that have been left behind, and through STEM centres and so on, we aim to create future talent today. We also support the Ministry of Education Malaysia's initiative in implementing the district transformation programme, and through this programme we can target schools with many students from low economic status families and students in rural areas, so that specific activities can be held to enhance and highlight their potential, particularly in academics and character development. This is important to lay the foundation for bridging the income gap; in the future, we must start from the basics. To ensure long-term economic growth for the state, the State Government is committed to implementing projects such as TSR and PTMP, which are major contributors to infrastructure investment and Penang's economic growth in the future. The State Government will ensure that efforts to bridge the gap between urban and rural areas are realised for more equitable economic distribution. Any development proposal implemented will take into account all aspects, including economic and social development of an area. Thank you, Honourable Pulau Betong.

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

Dato' Speaker, supplementary question. The question I raised earlier was about the gap. The gap between urban and rural areas. What I want to zoom in on at this sitting, the First Meeting of the Fifth Session, is that as far as I recall, every time the House sits I have raised the issue of gaps, for example the gap in well-maintained recreational places such as Taman Belia, for instance. Okay, I want to zoom in on this sitting at Anjung Indah, Balik Pulau. I have raised it three times, concerning water supply. We understand there are hawker stalls there and we need a water supply, but up to now the water supply problem has still not been resolved. I thank the City Council very much, and I likewise ask the District Office. I ask for the water supply to be provided on a regular basis. We know that the entrance to Balik Pulau is now the durian season, and I have been informed of a sharp increase in visitors from within and outside the State of Penang in connection with tourism. I have also heard complaints about Penang Visi2030. It is good, but the problem of bringing family, bringing the family who want to go to the toilet, ha, this is the problem.

Y.A.B. Chief Minister:

Okay, are you asking a question?

Haji Mohd Tuah bin IsmailPKR · PHPulau BetongEN

My question is when the State Government can resolve the water supply problem at Anjung Indah, which is a place visited by many people, as well as at Pasir Panjang. The District Office has completed the work at a cost of RM80,000 to repair the toilets, but the water supply problem remains. Two places, Pasir Panjang, Balik Pulau, and also Anjung Indah, Balik Pulau. I want to ensure that the State Government resolves the water supply problem.

Y.A.B. Chief Minister: I feel this problem exists because such structures are usually built without the relevant approvals from the agencies. Sometimes an allocation is obtained from a representative and they simply build without planning or approval. So even though the problem exists, for the Honourable Member for Pulau Betong this issue appears to be the most important throughout this session, but for us there are other important issues that need our attention. Therefore, since Pulau Betong is so concerned about this matter, I ask that at this stage the South West District Office take ownership of managing this issue, not take ownership of the toilet itself because we do not know who owns the toilet, but on the issue raised by Pulau Betong, the South West District Office must take ownership of this issue so that it can be addressed for the comfort of visitors to this place. Thank you.

Speaker (Speaker)EN

Thank you. Yes.

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

Thank you, Dato' Speaker. One supplementary question. When Pulau Betong mentioned obtaining development and economic gaps and so on, I in Bayan Lepas am quite disappointed that after four (4) years the Teluk Kumbar Public Market (Pasar Awam Pasar Teluk Kumbar) still has not become a reality. So I ask the State Government to be serious in proving that we are truly bringing development to this semi-urban area. Thank you.

Y.A.B Chief Minister: Thank you to Dato' Speaker, and the supplementary question is from Bayan Lepas, not Pulau Betong, Bayan Lepas. Indeed the Penang Island City Council (MBPP) has already called tenders for this project. I am not sure of the decision, perhaps they have reported to the Local Government EXCO, but that is not the only market facility in the KADUN Bayan Lepas. I understand that a few months ago a market, perhaps on a small scale, has already started operating in a new housing estate to serve the residents in the surrounding area.

So I hope the Penang Island City Council will be able to implement the market project in the Teluk Kumbar area so that additional facilities can be provided to the people in the surrounding area. Thank you.

Speaker (Speaker)EN

I would like to invite the Honourable Pengkalan Kota. Yes, it is question 61.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Telok Air Tawar, not Pengkalan Kota.

Speaker (Speaker)EN

Eh, sorry. Yes, yes, yes, sorry, Telok Ayer Tawar.

Dato' Mustafa Kamal bin AhmadPKR · PHTelok Ayer TawarEN

Dato' Yang Di-Pertua, my question is question number 61, No. 61. What is the Penang State Government's strategy to attract foreign investment (FOi) and domestic investment (DOI), particularly to ensure economic sustainability and job creation for the people?

Speaker (Speaker)EN

Sorry Telok Ayer Tawar.

Y.A.B Chief Minister: Thank you to Dato' Yang Di-Pertua. The question raised by the Honourable Teluk Ayer Tawar concerns the strategy to attract FDI and DDI to ensure economic sustainability and job creation for the people. Although this issue has been explained many times, I take the opportunity to state that the State Government's strategy is as follows. Investment promotion campaigns will be continued to attract more investment to our state. Before the pandemic, these campaigns were conducted through promotional missions overseas, but during the pandemic this work continued online together with stakeholders. The next matter focuses on developing a robust ecosystem, skilled and knowledgeable technical human resources, competitive operating costs, and ease of doing business in terms of infrastructure readiness and world-class industrial parks. These are the matters that expert investors give attention to when conducting due diligence on a location they are interested in investing in. I am informed that for every interested investor, they will in fact examine several locations at once. They do not examine Penang alone; at the same time they may be examining Kulim, Johor Bahru, Klang Valley, that is, for the country as a whole. Perhaps they look at potential in several countries before a decision is made. So that is a reality we must face, because it is not easy to win an investor, since they will carry out a very thorough assessment among several countries, and within one country they will look at several locations that can provide the criteria I mentioned earlier.

So Invest Penang plays a role, along with federal agencies playing an important role, to ensure we manage our state as a Penang Cyber City Manager and ensure the provision of office buildings to attract investors involved in information technology activities and so on. Invest Penang also offers a hand-holding programme. The hand-holding programme means that once Invest Penang receives an enquiry, it will act to hold the hand of the interested party from the start of the process until the land agreement is signed, because they will visit the site and have questions on incentives, existing infrastructure, skilled manpower, and all these are issues we must provide to future investors. That will also continue when they begin construction, seeking approvals from various technical agencies, finding local contractors, suppliers and so on. That is the service provided by Invest Penang and other agencies to ensure a smooth process for investors. And for those who want to see, from the moment they decide to buy land until the factory building is completed and begins operations, it may take only one year. Sometimes we are able to ensure the factory building is completed in 10 months, and we allow them to work perhaps 18 hours or even 24 hours, provided it does not cause disturbance, so that investors feel this is a location that is very friendly to them. PDC also plays a role in providing industrial parks in strategic areas. We have discussed many times the Batu Kawan Industrial Park, whose related land is almost exhausted, and PDC is now focusing on Bandar Cassia Technology Park and also phase three of Batu Kawan Industrial Park to meet future demand. That is all, thank you.

Speaker (Speaker)EN

Thank you, please.

Goh Choon AikPKR · PHBukit TambunEN

Supplementary question. Thank you to the Honourable Padang Kota. In the DUN Pinang Tunggal there is a Penang Technology Park that was approved in 2004 and has not been developed for 18 years. Recently a company submitted a Planning Permission application. Does the Government support this industrial area, since it is outside the PDC's maintenance area, and will this project be able to attract foreign investment and domestic investment to ensure balanced development in Seberang Perai?

Y.A.B Chief Minister: It is true that PDC has always been a government agency that provides and supplies land for industrial purposes, but we do not set aside land that has already been zoned for industry, as in this case. The Honourable Member and many others have mentioned the more than 800 acres of land, which has been zoned for industry since 2004. So when this project was revived recently, in addition to the land constraints faced by PDC, we hope such industrial land can also complement what PDC can do, and investors who are interested in investing in the State of Penang also have an option other than what is supplied and provided by PDC. So we do agree with this project. If we did not agree, we would not ask them to table it at the State Planning Committee, and we agree. I also, since the Honourable Deputy Chief Minister I is the representative for Pinang Tunggal where the Penang Technology Park is located, have given him the responsibility of steering this process with government agencies together with the developer so that this land can be made available as quickly as possible. According to reports received from time to time, this industrial land or industrial park has received attention from investment experts, and they are also carrying out promotional work. They also held sessions with federal agencies regarding tax incentives that can be given. They work closely with NCIA to prepare incentives, and this is what has been reported. In fact, notwithstanding, there are voices of the people who may not understand this development, and townhall sessions have been arranged to explain this project to local stakeholders. In fact, together with the Minister from Kepala Batas, a symbolic ground breaking launch has been scheduled for July. That is the progress for the Penang Technology Park here in Bertam SPU.

Speaker (Speaker)EN

Thank you, I would like to invite Seri Delima.

Syerleena binti Abdul RashidDAP · PHSeri DelimaEN

Thank you, Dato' Speaker. My question is question number 62, No. 62. A rubbish bin is a basic necessity to ensure that the surroundings are always clean. (a) What action is taken by the Local Authorities to ensure that neighbourhood parks and open spaces are always clean, and how can the Council control indiscriminate littering?

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Thank you to the Member for Seri Delima for the question on the action taken by the Local Authorities to ensure that neighbourhood parks and open spaces are always in a clean condition? Dato' Speaker, the State Government, through both Local Authorities, indeed takes seriously the cleanliness of the environment and always ensures that neighbourhood parks and open spaces are kept clean. The Penang Island City Council (MBPP) carries out cleaning of neighbourhood parks and open spaces on a scheduled basis according to designated areas. For problematic and critical areas that require mechanical cleaning, MBPP carries out taskforce cleaning twice (2) a week, with a work schedule of workers from each State Assembly area to help carry out the cleaning. MBPP is currently undertaking the process of replenishing 163 workers this year to meet the needs of staff who have retired or whose services have been terminated, Dato' Speaker. MBPP has also taken action to control indiscriminate littering as follows: (i) Erecting warning signboards 'Dilarang Membuang Sampah' (No Littering) at gathering places; (ii) Providing litter bins at tourist gathering places and recreational parks; (iii) Carrying out enforcement through scheduled anti-litter operations at gathering places.

As for the Seberang Perai City Council (MBSP), the action taken to ensure that neighbourhood parks and open spaces are always in a clean condition is by carrying out cleaning of floating rubbish and providing rubbish collection services three (3) times a week. The measures taken by MBSP to control indiscriminate littering are as follows: (i) Erecting "Dilarang Membuang Sampah" (No Littering) signboards at every hotspot location across Seberang Perai;

(ii) Installing closed-circuit cameras (CCTV) at several illegal dumping hotspot locations;

(iii) Carrying out regular monitoring at locations identified as places of illegal dumping; and Dato' Speaker, and finally

(iv) Providing rewards to informants of illegal dumping incidents.

That concludes my reply, Dato' Speaker.

Speaker (Speaker)EN

Thank you. Honourable Members, the one hour and thirty minutes for Oral Questions has ended in accordance with Sub-Rule 26(7) of the Penang State Legislative Assembly Standing Orders. Y.A.B. Chief Minister, please.

Y.A.B. Chief Minister: Yes, Honourable Dato' Yang Di-Pertua, the answers to the Oral Questions that were answered just now will be placed on the desks of the Members who asked them and included in the Official Report.

Speaker (Speaker)EN

Thank you. Honourable Members, we are now in the winding-up session of the Motion. Thanks to His Excellency Tun Yang di-Pertua Negeri Pulau Pinang, who graciously delivered an address to this House on 27 May last. I would like to ask the Honourable Members to make the winding-up. Please, the Most Honourable Chief Minister.

Y.A.B. Chief Minister: Thank you, Mr Speaker. Good day and Penang2030 greetings to Mr Speaker and to the Honourable Members, heads of departments, media friends, ladies and gentlemen, whom I respect. First of all, I would like to record my appreciation and thanks to all the Honourable Members who took part in the debate on the motion of thanks for the address of His Excellency Yang di-Pertua Negeri Pulau Pinang in this honourable House at the First Meeting of the Fifth Session of the Fourteenth Penang State Legislative Assembly on 27 May. Many incisive and constructive views were given by the Honourable Members, which can help the State Government continue to provide the best services to the people of Penang.

Mr Speaker, the Economic Situation Overview of Penang. The State of Penang has recorded encouraging GDP since 2008, where the annual GDP of the state has increased consistently by more than 5 per cent except in 2009 and 2012 due to weak global growth, particularly in the United States of America and Europe. The COVID-19 pandemic which has struck our country since 2020 has affected the economic performance of the entire country, and Penang's GDP in that year shrank to the level of 2.1 per cent. On 13 May 2020, the State Government set up the Penang Socio Economic Recovery Consultative Council (PSERCC) committee to discuss actions that can be implemented to reduce the impact of the COVID-19 pandemic and to reactivate the affected economic sectors of the state. The committee is intended to help the State Government identify emerging issues that hinder economic development and subsequently find proposed solutions. The implementation of the PSERCC Recovery Action Plan covers solutions to economic issues, and it is expected that these activities will contribute to increased employment, business and investment opportunities, and economic growth of the state that can improve the standard of living of our people. This committee has succeeded in contributing and making a major impact in the relevant sectors, namely the industrial sector involving SMI, SME and retail, the labour market sector, the housing sector involving the provision of incentives to buyers and developers, the infrastructure and transport sector, the tourism sector and the food industry sector. Mr Speaker, Penang's economy over the past 50 years has been supported by industry in Bayan Lepas and is recognised as a semiconductor and electrical and electronics (E&E) hub for this region. In 2021, Penang achieved the highest manufacturing investment value of RM76.2 billion. The total value of manufacturing investment from 2019 to 2021 was RM107.2 billion and created more than 51,000 job opportunities. The state's exports totalled RM310 billion in 2020, representing 32 per cent or nearly one third of the total investment in Malaysia. Penang is among the smallest states in Malaysia yet is able to generate a trade surplus of RM110 billion in 2020. As the Honourable Members are aware, Penang is the country's leading electrical and electronics (E&E) hub, and it contributes more than 40 per cent and 50 per cent respectively of the country's annual trade surplus and E&E exports since 2018. Penang also celebrates the 50th anniversary of industrialisation this year, and sustained excellence and a robust industrial ecosystem make us a suitable destination for industry. In 2020, more than 350 multinational companies (MNCs) and more than 4,000 SMEs and SMIs were located in this state, contributing nearly 30 per cent of Malaysia's total trade. For integrated circuit electronic products, Penang contributes 70 per cent of the country's total exports. The Bayan Lepas Free Industrial Zone has developed over the years as a regional E&E ecosystem. The Batu Kawan Industrial Park, which houses more than 160 companies, where both MNCs and local companies have grown, and the future lies in Batu Kawan Industrial Park 2 and other industrial parks. Penang continues to record excellence with manufacturing investment reaching the highest level of RM76.2 billion in 2021 despite facing the COVID-19 pandemic challenge. Penang's record last year significantly surpassed its previous performance through important projects from Intel Electronics and Ibiden Electronics and exceeded the cumulative investment from 2012 to 2020, which was only RM73.1 billion. This means that in one year, 2021, we recorded RM76.2 billion, exceeding the RM73 billion recorded for the years 2012 to 2020. In one year, we exceed what we achieved in eight (8) years. Although manufacturing investment is high for Penang, the State Government is committed to using a twin strategy to boost the economy through investment in the E&E sector and the digital economy. In an effort to attract more investment and implement sustainable development, the State Government needs to address three (3) main challenges consisting of land for industry, water resources to meet future needs, and human capital issues. One important approach taken by the State Government to address these challenges is through the Penang2030 Vision, in which four (4) main themes, namely improving the standard and quality of life of residents, expanding the size of the economy to increase household income, empowering the people to strengthen the civil society system, and our investment in natural environment development to make it more resilient, are seen to be able to further elevate the potential of our state as an investment destination in this region. To that end, on 7 June 2022, the State Government will launch the Penang2030 Vision Target Achievement Monitoring Dashboard.

Honourable Mr Speaker and Honourable Members, the State Government agrees with the views of the Honourable Air Putih, who stated that the digital economy is one of the important aspects that need to be emphasised to make the State of Penang a Smart State. To that end, the State Government has approved an allocation of RM2 million for the implementation of various programmes under Digital Penang. Of that amount, an allocation of RM1.8 million has been earmarked for digital economy initiatives. Digital Penang has implemented several incentives such as the Founder's Grit Seed Programme, the Penang Co-working Incubator and Accelerator (PCIA), the Creative Digital District (CD2), the Sandbox Incentive and the Landing Zone Incentive to help and encourage start-up companies to venture into the digital economy. The State Government welcomes the suggestion of the Honourable Batu Uban, who requested that the digital economy initiative be continued to help more of our state's people. In addition, Digital Penang also works with the Northern Corridor Implementation Authority (NCIA) and the Malaysia Digital Economy Corportion (MDEC) to implement programmes such as My Digital Workforce Work in Tech (MYWiT) and incentive programmes to attract investors to Penang.

The Future of Penang is in Seberang Perai. Thank you to the Honourable Bukit Tambun for still remembering what I said. For the information of this honourable House, the State Government's administration since 2018 has focused on balanced development between the Island and Seberang Perai. The method used by the State Government to ensure balanced sustainable development in both areas is through the Penang State Structure Plan 2030 (RSNPP 2030), which was gazetted on 24 October 2019. The Penang State Structure Plan is translated into Local Plans (RT) and Special Area Plans (RKK) under the provisions of the Town and Country Planning Act (Act 172) in the form of land-use proposal maps and detailed action plans, and the preparation of the Local Plans and Special Area Plans has taken into account all inputs involving the latest population data, physical conditions and current land-use activities, and is projected according to current development trends up to 2030. Besides that, the Penang Development Corporation (PDC) is one of the main agencies implementing development in our state. Among the methods used by PDC are as follows: a Strategic Plan for PDC focusing on the growth of new development areas oriented towards Green and Smart Cities and the enhancement of asset value and as a driver of balanced State Government initiatives; the Bandar Cassia Master Development Plan involving a combination of mixed and integrated development involving housing, commercial, education, medical and industrial uses; development planning at Bandar Cassia Technology Park and Batu Kawan Industrial Park 3 (BCTP) to ensure that the supply of land for industry to investors is sufficient for promoted industries consisting of E&E (Electrical & Electronics), Electronic Manufacturing Services (EMS), Light Emitting Diodes (LED), Medical Devices, Aerospace, Semiconductor, Automotive and other related activities and so on; a study on the development of Penang Science Park South (PSPS) for general industry, halal food, and the development of a logistics hub involving part of the land of Batu Kawan Industrial Park 3 and Penang Science Park South; and an emphasis on the concept of Environmental Social Governance (ESG) and Sustainable Development Goals (SDG) at the land-use planning level in development areas through PDC. The elements of work, live, learn and play, as well as green, safe and smart in new development areas, are to ensure the social ecosystem, facilities and employment opportunities in line with market reform and the property development revolution are in keeping with the above concepts. Batu Kawan, which is one of the catalyst areas for rapid growth in Seberang Perai, and indeed many industries are concentrated in this area. The State Government through PDC is developing this area as a main industrial area. PDC is currently actively developing the Batu Kawan Industrial Park, and Batu Kawan East and South Penang Science Park.

Although Seberang Perai is developing rapidly, the State Government cannot deny that there are still several problems such as traffic congestion, solid waste management or landfill sites, river pollution and water supply problems, which exist as growing pains or pain points in the development process in the State of Penang, particularly in Seberang Perai, where a situation of very rapid development is now taking place, but infrastructure is still slightly lagging behind. I urge all the agencies involved that we must make careful planning so that we can ensure the provision of infrastructure can keep up with the very rapid development process, particularly in Seberang Perai. We can see in this honourable House that the Honourable Bukit Tambun, Bukit Tengah and Jawi have raised issues concerning the Seberang Perai area. The State Government is always striving hard to ensure that Seberang Perai becomes a catalyst for growth in the future. However, Penang needs more allocations to improve these amenities and facilities. These growing pains require a lot of infrastructure, and it is beyond the State Government's capacity to finance such projects.

State Development Allocation VS Federal Development Allocation. Mr Speaker, let us look at the State Development allocation compared with the Federal Development allocation, Mr Speaker. The State Government has approved an allocation of RM316.13 million for the implementation of development projects in 2022. This year's development allocation has taken into account the needs of critical and high-impact projects and ensured the continuity of follow-on projects still under implementation. The State Government is aware that development projects implemented are important for the welfare of the people and for boosting the state's economy. However, the development allocation from the State Government alone is not sufficient to improve the network of facilities and needs in Seberang Perai as well as in Penang as a whole. As stated by His Excellency Yang di-Pertua Negeri, cooperation between the Federal Government and the State Government is important to ensure that infrastructure development projects can be implemented according to the timeline set in Penang. It cannot be denied that the contribution of the State of Penang to the country's GDP and the state's investment value is very high. However, the contribution and efforts of the State Government are not rewarded commensurately by the Federal Government. Almost all the Honourable State Assemblymen (ADUN) in this honourable House, except those from the Opposition, agree and feel that Penang is being sidelined or marginalised from the benefits of development. What the State Government is requesting is not special treatment, as I have said many times, we do not want special treatment but fair treatment, so that the people can enjoy the benefits. The Honourable Jawi raised the matter of the number of projects applied for by the State Government under the 12th Malaysia Plan (RMK 12) which have yet to be approved. For the information of the Honourable Member and this honourable House, the State Government has submitted a total of 111 projects under the 12th Malaysia Plan (RMK 12), a second growing plan for 2022, and of that total, only six (6) projects proposed by the State Government were approved out of 111, only six (6) received, that is the reality we are trying to convey to this honourable House and to the Federal Government.

Penang should rightly be considered for more projects to be implemented for the benefit of the people. If they do not like the face of the former Chief Minister and former Finance Minister, or do not like my face, do not take revenge on our people who need these infrastructure projects. As a proactive measure, the State Government has set up a committee aimed at identifying issues involving Federal and State relations, including calls for a fairer distribution of resources. The report prepared by this Committee has recommended the establishment of a Federal and State Commission, an All-State Cooperation Committee, and a Committee of this House, for the improvement of Federal and State relations. The State Government hopes that the proposals given will receive the attention of the Federal Government for the interests of the State of Penang in particular and Malaysia in general. Earlier, what we stated about the contribution of the State of Penang in terms of export and investment…blah blah blah, that is for the country, contributing to Malaysia and not to the State of Penang, but we have said many times that we need more allocations to develop further and contribute more to the Federation. However, this reality has still not reached those above so that they understand that as a state that does not have many natural resources, we actually need projects from the Federation. Although facing constraints in terms of allocation, the State Government still strives to address the issues faced in Seberang Perai. The efforts taken by the State Government to address the issue of traffic congestion in Seberang Perai are by providing public bus transport services and upgrading road infrastructure. In fact, for 10 years while I was EXCO for Local Government and Traffic Management, we had many meetings with Federal agencies and are aware of our requests for projects that can address the issue of traffic congestion, particularly in Seberang Perai, but unfortunately, to date, not many of the projects we have proposed have been approved by the Federal Government.

Mr Speaker and Honourable Members, many Honourable Members have touched on the water problem, particularly in South Seberang Perai recently, and the Honourable Tanjong Bunga has already given a sufficiently good explanation to this honourable House and to the affected people. I would just like to give some additional information, namely that Penang's daily water consumption has risen by 10.4 per cent over these three (3) years. We thought it was the two (2) years of the pandemic, so why has our daily water consumption risen 10.4 per cent in these three (3) years, that is from 843 million litres per day or MLD in 2019 to 931 MLD in May this year. Although most economic sectors were not allowed to operate in 2020 and 2021, which was during the COVID-19 pandemic, water consumption still increased in Penang following increased consumption by domestic consumers. As a comparison, historical data shows that in the nine (9) years before this, from 2010 to 2019, water consumption increased by 7.8 per cent, but in these three (3) years it has increased by 10.4 per cent. Just now we said three (3) years of more investment than eight (8) years of water consumption, likewise in these three (3) years we use more compared with 7 or 8 years before. The State Government, through the Penang Water Supply Corporation, has identified short-, medium- and long-term plans to reduce the water supply problem in South Seberang Perai, as argued by the Honourable Tanjong Bunga.

Penang e-Land System. The Honourable Air Putih, during the debate, raised the importance of digitising land searches in line with today's technological developments, and that this effort should be accelerated. The Honourable Member also stated that the State Government needs to find other methods to implement the digitalisation of the land administration system, given that cooperation with the Federal Government is expected to take time and will incur high costs. I would like to inform this honourable House that the Penang e-Land System was developed in 2005 and began to be used in the Penang Land Administration in 2008 until now. Taking into account the current e-Land System, which is less stable, software that has reached End of Life (EOL), and a very high error rate, the Penang State Government is of the view that the new development of the e-Land System for our state needs to be implemented urgently. I myself have written a letter to the Minister of Energy and Natural Resources (KETSA), namely the Honourable Datuk Seri Takiyuddin bin Hassan from PAS, to request that the new development of the e-Land System Phase 2 in the State of Penang be expedited. I also raised the issue of the development of the e-Land System Phase 2 in the Parliamentary sitting on 5 October 2021, and I am glad to report that we received a positive response from the Honourable Minister. The development of the e-Land System Phase 2 currently involves nine (9) states in Peninsular Malaysia only, excluding Penang, Melaka and Negeri Sembilan. At present, only the Federal Territory, Kuala Lumpur and Perak have used the e-Land System Phase 2. The Penang State Government has also been informed that the Cabinet meeting on 13 October 2021 approved the application for the implementation of the e-Land System Phase 2 for Penang, Melaka and Negeri Sembilan. On 4 March recently, a briefing session and site visit by the Federal Department of the Director General of Lands and Mines (JKPTG) to the Penang Land and Mines Office (PTG) was held to look at the current state of the Penang e-Land system. Ministers from PAS can also help the State of Penang, thank you. The implementation of the e-Land System Phase 2 development in Penang is expected to take between two (2) and three (3) years (possibly more than 3 years). In this regard, the State Government has also taken the initiative of approving an allocation of RM2.62 million for the development of the Penang Local Land Services Online System (PgLAND), which will enable online submission applications to be implemented, including official searches and private searches. The development of this system will involve the PTG and all District and Land Offices. PgLAND is expected to begin development in July this year and can be used from January 2023.

Mr Speaker and Honourable Members, the Penang State Government Manifesto is one of the matters widely discussed in this session of the sitting. The Honourable Sungai Dua touched on several issues such as river pollution, solid waste disposal, pig farming and so on, which were not stated in the manifesto and need to be given attention by the State Government. For the information of the Honourable Member and this House, the manifesto drawn up by Seberang Jaya is also there, but by the State Government it is a target set four (4) years ago and involves several important matters identified. Although not included in the manifesto achievements, the State Government still gives attention to and monitors the matters raised by the Honourable Sungai Dua.

Furthermore, the Honourable Leader of the Opposition also stated twice that, although the State Government's manifesto achievement is around 90 per cent, he is worried about the results and impact of that achievement, whether it is fair and whether it reaches all groups in our state. In relation to this matter, I would like to inform you that the 2018 manifesto was drafted carefully so that it would benefit all groups of society, including protecting their interests regardless of race, religion, social status and so on. The manifesto was also drafted with clear objectives for the development of our state. Regarding issues such as river pollution and so on that are claimed not to be stated in the manifesto, this is totally untrue. These issues have indeed been subject to continuous action since 2018. They have also been made targets under the Strategic Initiatives of Vision Penang2030, meaning that in these four (4) years we have roughly worked hard to fulfil the 2018 manifesto. In addition, we also introduced the Penang2030 Vision. Both documents have become the core of what we do in this State of Penang. Such issues are indeed made targets under the strategic initiatives of the Penang2030 Vision, and the Honourable Members can check the achievement of these targets through the Penang2030 Dashboard System, which has already been uploaded to the Penang2030 website. In addition, the Honourable Sungai Dua can also refer to the booklet Three-Year Achievements of the Penang2030 Vision, which was launched in January this year, regarding the efforts that have been implemented by the State Government, apart from the matters enshrined in the manifesto. The Honourable Seberang Jaya, the Honourable Penaga and the Honourable Sungai Acheh in this honourable House have also questioned the State Government's achievement in implementing the 68 promises (akujanji) contained in the manifesto. Here, I wish to emphasise that the State Government has achieved 90 per cent implementation based on the fact that 54 promises have been fulfilled, six (6) promises have reached the advanced level of planning with budget commitment, and two or three more are under the jurisdiction of the Federal Government. The State Government takes this matter very seriously because it involves promises that have been made to the people of the State of Penang. Indeed, there are several promises that are being implemented and will be completed in the future. However, what I want to emphasise here is that the State Government's efforts to fulfil its promises have begun and should be reported for the knowledge of the people of the State of Penang, and I think in Malaysia there is no state that dares to have a manifesto and dares to share the achievement of its manifesto. We see this as a commitment to the people, which shows that we do not betray the mandate given by the common people and voters. In conclusion... (interruption).

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

May I ask to interject, Honourable Member. Thank you, Honourable Member. I was glad to hear the commitment given by the Honourable Chief Minister to fulfil the manifesto that was signed and also presented to the people in 2018. But the issue we raised in this House is the claim that 90 percent of those promises have been implemented or achieved. I think that is misleading to the public because...(interruption) let me say, because what I raised is....(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Only Seberang Jaya doesn't care.

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Let me look at the reality of the manifesto, because some of the matters were raised. I believe those at the back did not listen to or even look at the manifesto, and did not study each item, because most of the items in it have been repeated from the 2013 manifesto. For example, solving this traffic problem. This is a major issue we discuss every time in this House. I remember I have been in this House for almost 10 years. We have discussed this matter, and the level of implementation has not reached 90 percent, that is what I compared. To state that merely giving a commitment to implement is something anyone can promise, Honourable Member. That is what I raised, which we should discuss seriously. To accept it rhetorically, okay, Pakatan Harapan is the best in the world, accept that, but the reality is that the people below still...(interruption), our own problems are not solved in facing those problems. That is why I raised it with the Honourable Chief Minister...(interruption).

Y.A.B. Chief Minister It has already been raised in the debate. There were two (2) items. We feel there is an overlap that has not been implemented. If we have not implemented them, we will be frank about why we have not, because the Federal Government has already implemented programmes such as Prihatin, PeKa B40 and so on, so 66...(interruption).

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Honourable Member, I understand that, but...(interruption).

Y.A.B. Chief Minister Let me explain. The Honourable Member has already argued in the debate...(interruption).

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

The Honourable Member was personally involved in planning to implement highway construction projects and public transport projects, and this is a major issue. That is why I do not agree. Some of my colleagues in the Opposition do not agree with repeating and saying 90 percent has been achieved...(interruption)..

Speaker (Speaker)

Nantilah dengarlah.

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

So that is why....(interruption).

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Why is it only some of the Opposition who agree with you? Why only some of the Opposition, why not all?

Lee Chun KitDAP · PHPulau TikusEN

Everyone else just sits quietly, only you. ...(interruption), if you want to do politics, then speak about politics.

Speaker (Speaker)EN

Listen to the explanation first.

Y.A.B. Chief Minister. We did not say it has been fulfilled. We said its status is still under implementation....(interruption).

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

So, that means the Honourable Member agrees that 90 percent has not yet been achieved...(interruption)..

Y.A.B. Chief Minister. Yes, some have not yet been achieved...(interruption)..

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Okay.

Y.A.B. Chief Minister. I will be frank...(interruption).

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

That is what we want...(interruption).

Y.A.B. Chief Minister. Listen carefully...(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Seberang Jaya is the only one who is confused...(interruption).

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

It is not 90 percent, so does that mean it has not yet been achieved, is that right, Honourable Member?

Lee Chun KitDAP · PHPulau TikusEN

Seberang Jaya drafted it, Seberang Jaya drafted it first. Seberang Jaya drafted it first.

Y.A.B. Chief Minister. 68 minus 2 is 66. I said 54 have been fulfilled. This means there are 12 under implementation, and among those 12, some are at various stages of implementation, including six (6) that have budget commitments and agreements too. We calculate from the 12, I only take six (6). 54 plus 6 is the answer? 60 out of 66?

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Honourable Member....(interruption).

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Seberang Jaya failed mathematics, Seberang Jaya failed mathematics.

Lee Chun KitDAP · PHPulau TikusEN

Seberang Jaya, sit down. Perikatan Nasional doesn't even have a manifesto of its own.

Y.A.B. Chief Minister ...(interruption), never mind, Seberang Jaya can prepare a manifesto later.

Saya mohon.

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

No, that is why I raised it, because I want the public and all of us in this House to understand that the promise to do 90 percent of the entire manifesto. We deduct the 10 percent that cannot be done, so that is correct. No, you have already repeated it just now, overlapping and so on, is that right? Okay.

Y.A.B. Chief Minister: First, I have an answer...(interruption)..

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

So now, that means (interruption).

Speaker (Speaker)EN

Hear the whole thing first.

Dr. Afif bin BahardinPKR · PHSeberang Jaya

90 peratus.

Lee Chun KitDAP · PHPulau TikusEN

Seberang Jaya, sit down.

Y.A.B. Chief Minister Today is Friday.

Speaker (Speaker)EN

Hear the whole thing first...(interruption). Seberang Jaya, let him finish...(interruption)

Honourable CM, may I say one thing..(interruption) I seek a passage..

Speaker (Speaker)EN

No need. Sit down.

Y.A.B. Chief Minister: Today is Friday.

Speaker (Speaker)EN

Wait. We have heard it already. Listen here...(interruption).

Y.A.B. Chief Minister: As a closing to this honourable House, with the wishes conveyed by Tuan Yang Terutama Yang di-Pertua Negeri, the State Government will continue to strive to provide the best service to the people of the State of Penang. The State Government will intensify our efforts to achieve matters such as the following: 1 term of 5 years, we have only completed 4 years, there is one more year to do this: (a) Achieve the remaining 10 percent, still striving, there is one more year...(interruption). (b) Accelerate the achievement of the Penang2030 Vision. (c) Focus on economic recovery after the COVID-19 pandemic. (d) Administer the State of Penang with good governance based on the principle of CAT; and (e) Ensure and safeguard the welfare of the people of the State of Penang.

There is still one (1) year left for us to do much more. At the end of next year, maybe I will report 93 percent, perhaps. There are things we cannot do, and we are honest that there are matters under Federal jurisdiction...(interruption).

Satees a/l MuniandyDAP · PHBagan DalamEN

Request for an explanation.

Y.A.B. Chief Minister: But if you read carefully, even though it involves Federal jurisdiction, what we say is demands, demands for example 65, decentralisation of such and such powers. Most of the matters under jurisdiction demand that the State of Penang be allowed to approve land ownership and so on, demands, we all continue to demand...(interruption)..

I would like to ask to interject.

Y.A.B. Chief Minister: One important matter that was expressed by Tuan Yang Terutama Tun is unity, Dato' Yang di-Pertua, which unites the multiracial, multi-religious and multi-ethnic Malaysian society. All the achievements attained by the State Government, including the manifesto, will become meaningless if the unity that we have maintained all this time is shaken. It is the responsibility of all parties to maintain the unity of society so that harmony can be enjoyed and passed on to future generations. On this occasion I wish to record my millions of thanks to the EXCO members of the State Government and all members of the Penang State Public Service, who have given a very high commitment over this period in realising the mission of achieving the targets under the Four Themes and 16 Strategic Initiatives of the Penang2030 Vision. Thank you also to the Honourable Members who have given many suggestions and comments for action and attention by the State Government. And with that, Dato' Yang di-Pertua, I ask to support. [Members of the House knocked on the desks]

Speaker (Speaker)EN

Thank you, Honourable Padang Kota. Honourable Members, I thank all who have taken part in the debate session and the winding-up session. Honourable Members, all the winding-up sessions have been completed, and the problem we now face is the motion that "We, the Speaker of the Penang State Legislative Assembly and the Members of the Penang State Legislative Assembly, respectfully thank Tuan Yang Terutama Yang di-Pertua Negeri of Penang for graciously delivering an address to this House at the First Meeting of the Fifth Session of the 14th Penang State Legislative Assembly on 27 May 2022, be agreed to". Those who agree, say "Yes".

Members of the House: "Yes"

Speaker (Speaker)EN

Those who do not agree, say "No". "Yes", the motion is agreed unanimously.

Secretary of the HouseEN

Item 6(b), motion by the Honourable Deputy Chief Minister II.

YB. Mr Speaker of the State Legislative Assembly, please.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Thank you, Speaker of the House. This is the tabling of the motion on the "Appointment of Members of the Appeals Board under the Penang Freedom of Information Enactment 2010 [Enactment 16]". Honourable Dato' Yang di-Pertua, I respectfully propose that this House approve the motion under Subsection 13(3), Penang Freedom of Information Enactment 2010 [Enactment 16], for the appointment of Members of the Appeals Board for a period not exceeding two (2) years from 1 June 2022 to 31 May 2024. The list of Members of the Appeals Board is as follows: Tuan Wong Chiang Kiat (Chairman), YBhg. Dato' Seri Syed Jaafar bin Syed Ali (Deputy Chairman), YBhg. Dato' Ajit Singh Jessy (Member), YBhg. Dato' Murelidaran M. Navaratnam (Member), YBhg. Dato' Agatha Foo Tet Sin (Member); and Puan Regina Amalorpava Mary a/p Aboorvasamy (Member).

The duties of the Appeals Board are as stated under Section 13 of Enactment 16 mentioned. Honourable Dato' Yang di-Pertua of the House, I propose the motion which reads as follows: 'The Penang Freedom of Information Enactment 2010 [Enactment 16] was passed by the Penang State Legislative Assembly on 4 November 2011 and was gazetted on 2 February 2012. Enactment 16 came into force on 1 January 2015'. Thus the appointment of Members of the Appeals Board is required as stipulated under Subsection 13(2) of Enactment 16, and the appointment is subject to the approval of the State Legislative Assembly. The term for one appointment period is two (2) years and must be gazetted. The nomination of the names of the Members of the Appeals Board was agreed through the State Government Executive Council Meeting No. 16/2022 on 18 May 2022 and confirmed on 25 May 2022, with the membership of the Appeals Board involving the following candidates: Tuan Wong Chiang Kiat (Chairman), YBhg. Dato' Seri Syed Jaafar bin Syed Ali (Deputy Chairman), YBhg. Dato' Ajit Singh Jessy (Member), YBhg. Dato' Murelidaran M. Navaratnam (Member), YBhg. Dato' Agatha Foo Tet Sin (Member), and lastly Puan Regina Amalorpava Mary a/p Aboorvasamy (Member).

The appointment of the Members of the Appeals Board was made taking into account the experience and qualifications of the candidates, covering the legal, security and State Affairs of Penang aspects, which are seen as significant to the requirement of implementing Enactment 16 comprehensively. The role of these Members of the Appeals Board is important for the purpose of considering all appeals received from any applicant who is aggrieved by the decision of the Information Officers in State Departments, State Statutory Bodies and Local Authorities who reject applications for access to information in those departments. Without the appointment of these Members of the Appeals Board, the appeal process against applications rejected by the Information Officer cannot be considered, and this will cause the applicant's right to obtain access to information as provided under Enactment 16 to be denied. Honourable Dato' Yang di-Pertua of the House, the level of public awareness regarding their right to access information and the laws related to Freedom of Information is increasingly evident nowadays. Therefore, the Pakatan Harapan State Government, as a pro-people state, should strive to ensure that the people of Penang are given the freedom to access information through proper and clear channels, through administrative policies of "Efficient, Accountable and Transparent" in Penang. With this, Honourable Dato' Yang di-Pertua of the House, I respectfully propose the appointment of Members of the Appeals Board for a period not exceeding two (2) years from 1 June 2022 to 31 May 2024. That is all. I respectfully ask for support.

Speaker (Speaker)EN

Thank you. I respectfully ask that the motion be supported.

I hereby support.

Speaker (Speaker)EN

Thank you. Honourable Members, as has been notified by the Honourable Member for Perai, this is a motion for us to renew the appointment of Members of the Appeals Board for a period of two (2) years from 2022 to 2024. So I ask that this motion be decided immediately. Unless there are Honourable Members who wish to debate this appointment. Okay. Thank you, Honourable Members. I also want to ask Perai if there is any winding-up to be done.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

We say this is something required under Enactment 16 and needs to be passed in the House, so we are taking this matter to the House, and I think it is one process that needs to be carried out. But if there are Members of the House who wish to debate, I think it is still possible, I will be ready to respond.

Speaker (Speaker)EN

Okay. Thank you, Perai. Honourable Members, the problem we now face is the motion from the Honourable Member for Perai, which reads that "This House approves the motion under Subsection 13(3), Penang Freedom of Information Enactment 2010 [Enactment 16], for the appointment of Members of the Appeals Board for a period not exceeding two (2) years from 1 June 2022 to 31 May 2024. The list of Members of the Appeals Board is as follows: Tuan Wong Chiang Kiat as Chairman, YBhg. Dato' Seri Syed Jaafar bin Syed Ali (Deputy Chairman), YBhg. Dato' Ajit Singh Jessy (Member), YBhg. Dato' Murelidaran M. Navaratnam (Member), YBhg. Dato' Agatha Foo Tet Sin (Member), Puan Regina Amalorpava Mary a/p Aboorvasamy (Member) be agreed to". Those who agree, say "Yes".

Members of the House: "Yes"

Speaker (Speaker)EN

Those who do not agree, say "No". Okay, the motion is agreed unanimously. Please, Honourable Member.

Y.A.B. Chief Minister: Honourable Member, Dato' Yang di-Pertua and Honourable Members, I respectfully propose that this House be adjourned now.

Speaker (Speaker)EN

Seconded. Not postponing? Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

I respectfully second.

Secretary of the HouseEN

Honourable Members, the Honourable Chief Minister has proposed that this House be adjourned and the motion has received support.

Speaker (Speaker)EN

Honourable Members, once again, thank you for your cooperation throughout the course of this Sitting of the House. Therefore, this House is hereby adjourned to a date to be notified later. Thank you.

The House was adjourned at 12.00 noon.